WorldWideScience

Sample records for hatchery master plan

  1. Northeast Oregon Hatchery Spring Chinook Master Plan, Technical Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Ashe, Becky L.; Concannon, Kathleen; Johnson, David B.

    2000-04-01

    Spring chinook salmon populations in the Imnaha and Grande Ronde rivers are listed as threatened under the Endangered Species Act (ESA) and are at high risk of extirpation. The Nez Perce Tribe, the Confederated Tribes of the Umatilla Indian Reservation, and Oregon Department of Fish and Wildlife, are co-managers of conservation/restoration programs for Imnaha and Grande Ronde spring chinook salmon that use hatchery supplementation and conventional and captive broodstock techniques. The immediate goal of these programs is to prevent extirpation and provide the potential for restoration once factors limiting production are addressed. These programs redirect production occurring under the Lower Snake River Compensation Plan (LSRCP) from mitigation to conservation and restoration. Both the Imnaha and Grande Ronde conservation/restoration programs are described in ESA Section 10 permit applications and the co-managers refer to the fish production from these programs as the Currently Permitted Program (CPP). Recently, co-managers have determined that it is impossible to produce the CPP at Lookingglass Hatchery, the LSRCP facility intended for production, and that without additional facilities, production must be cut from these conservation programs. Development of new facilities for these programs through the Columbia Basin Fish and Wildlife Program is considered a new production initiative by the Northwest Power Planning Council (NPPC) and requires a master plan. The master plan provides the NPPC, program proponents and others with the information they need to make sound decisions about whether the proposed facilities to restore salmon populations should move forward to design. This master plan describes alternatives considered to meet the facility needs of the CPP so the conservation program can be fully implemented. Co-managers considered three alternatives: modify Lookingglass Hatchery; use existing facilities elsewhere in the Basin; and use new facilities in

  2. Monitoring and evaluation plan for the Nez Perce Tribal Hatchery

    Energy Technology Data Exchange (ETDEWEB)

    Steward, C.R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and released under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan, the 1995 Supplement to the Master Plan, and the Nez Perce Tribal Hatchery Program Environmental Impact Statement. The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts.

  3. Monitoring and Evaluation Plan for the Nez Perce Tribal Hatchery, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Steward, Cleveland R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and released under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan (Larson and Mobrand 1992), the 1995 Supplement to the Master Plan (Johnson et al. 1995), and the Nez Perce Tribal Hatchery Program Environmental Impact Statement (Bonneville Power Administration et al. 1996). The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine. whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts. Program success will be gauged primarily by changes in the abundance and distribution of supplemented chinook populations. The evaluation of project-related impacts will focus on the biological effects of constructing and operating NPTH hatchery facilities, introducing hatchery fish into the natural environment, and removing or displacing wild

  4. Coho Salmon Master Plan, Clearwater River Basin.

    Energy Technology Data Exchange (ETDEWEB)

    Nez Perce Tribe; FishPro

    2004-10-01

    The Nez Perce Tribe has a desire and a goal to reintroduce and restore coho salmon to the Clearwater River Subbasin at levels of abundance and productivity sufficient to support sustainable runs and annual harvest. Consistent with the Clearwater Subbasin Plan (EcoVista 2003), the Nez Perce Tribe envisions developing an annual escapement of 14,000 coho salmon to the Clearwater River Subbasin. In 1994, the Nez Perce Tribe began coho reintroduction by securing eggs through U.S. v. Oregon; by 1998 this agreement provided an annual transfer of 550,000 coho salmon smolts from lower Columbia River hatchery facilities for release in the Clearwater River Subbasin. In 1998, the Northwest Power and Conservation Council authorized the Bonneville Power Administration to fund the development of a Master Plan to guide this reintroduction effort. This Master Plan describes the results of experimental releases of coho salmon in the Clearwater River Subbasin, which have been ongoing since 1995. These data are combined with results of recent coho reintroduction efforts by the Yakama Nation, general coho life history information, and historical information regarding the distribution and life history of Snake River coho salmon. This information is used to assess a number of alternative strategies aimed at restoring coho salmon to historical habitats in the Clearwater River subbasin. These data suggest that there is a high probability that coho salmon can be restored to the Clearwater River subbasin. In addition, the data also suggest that the re-establishment of coho salmon could be substantially aided by: (1) the construction of low-tech acclimation facilities; (2) the establishment of a 'localized' stock of coho salmon; and (3) the construction of hatchery facilities to provide a source of juvenile coho salmon for future supplementation activities. The Nez Perce Tribe recognizes that there are factors which may limit the success of coho reintroduction. As a result of these

  5. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  6. Umatilla Hatchery Monitoring and Evaluation, 1998-1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Stonecypher, R. Wess; Groberg, Jr., Warren J.; Farman, Brett M. (Oregon Department of Fish and Wildlife, Portland, OR)

    2001-07-01

    The Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program authorized construction of Umatilla Fish Hatchery (UFH) in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan (MI) raceways using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss). The hatchery was completed in fall 1991. Partial justification for the hatchery was to evaluate new production and supplementation techniques. MI raceways at UFH increase smolt production with a limited water supply. Test results for MI raceways will have systematic application in the Columbia River basin. The UFH is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River (CTUIR and ODFW 1990) and is expected to contribute significantly to the Northwest Power Planning Council's goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan (CTUIR and ODFW 1990). The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery (Carmichael 1990) was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. The monitoring and evaluation goals are: (1) Provide information and recommendations for the culture and release of hatchery fish, harvest regulations, and natural escapement to accomplish long-term natural and hatchery production goals in the Umatilla River basin that are consistent with provisions of the Council's Columbia River Basin Fish and Wildlife Program. (2) Assess the

  7. Umatilla Hatchery monitoring and evaluation : annual report, 1999; ANNUAL

    International Nuclear Information System (INIS)

    2001-01-01

    The Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program authorized construction of Umatilla Fish Hatchery (UFH) in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan (MI) raceways using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss). The hatchery was completed in fall 1991. Partial justification for the hatchery was to evaluate new production and supplementation techniques. MI raceways at UFH increase smolt production with a limited water supply. Test results for MI raceways will have systematic application in the Columbia River basin. The UFH is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River (CTUIR and ODFW 1990) and is expected to contribute significantly to the Northwest Power Planning Council's goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan (CTUIR and ODFW 1990). The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery (Carmichael 1990) was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. The monitoring and evaluation goals are: (1) Provide information and recommendations for the culture and release of hatchery fish, harvest regulations, and natural escapement to accomplish long-term natural and hatchery production goals in the Umatilla River basin that are consistent with provisions of the Council's Columbia River Basin Fish and Wildlife Program. (2) Assess the success of achieving

  8. Business plan Hatchery Facility Zambezi Valley, Mozambique

    NARCIS (Netherlands)

    Vernooij, A.G.; Wilschut, S.

    2015-01-01

    This business plan focuses on the establishment of a hatchery, one of the essential elements of a sustainable and profitable poultry meat value chain. There is a growing demand for poultry meat in the Zambezi Valley, and currently a large part of the consumed broilers comes from other parts of the

  9. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  10. Integrated Hatchery Operations Team: Policies and Procedures for Columbia Basin Anadromous Salmonid Hatcheries, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Integrated Hatchery Operations Team (Northwest Power Planning Council, Portland, OR)

    1995-01-01

    This document outlines regional policies and procedures for hatchery operations in the Columbia River Basin. The purpose of these policies is to provide regional guidelines by which all anadromous fish hatcheries will be operated. These policies will be adopted by the fisheries co-managers, and will provide guidance to operate hatcheries in an efficient and biologically sound manner. The hatchery policies presented in this manual are not intended to establish production priorities. Rather, the intent is to guide hatchery operations once production numbers are established. Hatchery operations discussed in this report include broodstock collection, spawning, incubation of eggs, fish rearing and feeding, fish release, equipment maintenance and operations, and personnel training. Decisions regarding production priorities must be provided by fishery managers through a comprehensive plan that addresses both natural and hatchery fish production. The Integrated Hatchery Operations Team is a multi-agency group called for by the Northwest Power Planning Council. This team was directed to develop new basinwide policies for managing and operating all existing and future anadromous fish hatcheries in the Columbia River Basin. The parties pledge to confer with each other and to use their authorities and resources to accomplish these mutually acceptable hatchery practices.

  11. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP

  12. Hatchery evaluation report: Lyons Ferry Hatchery - fall chinook. Final report

    International Nuclear Information System (INIS)

    Watson, M.

    1996-05-01

    This report presents the findings of the independent audit of the Lyons Ferry Hatchery (Fall Chinook). The audit is being conducted as a requirement of the Northwest Power Planning Council (NPPC) ''Strategy for Salmon'' and the Columbia River Basin Fish and Wildlife Program. Under the audit, the hatcheries are evaluated against policies and related performance measures developed by the Integrated Hatchery Operations Team (IHOT). IHOT is a multi-agency group established by the NPPC to direct the development of new basinwide standards for managing and operating fish hatcheries. The audit was conducted in April 1996 as part of a two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the US Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife

  13. Interior design. Mastering the master plan.

    Science.gov (United States)

    Mesbah, C E

    1995-10-01

    Reflecting on the results of the survey, this proposed interior design master planning process addresses the concerns and issues of both CEOs and facility managers in ways that focus on problem-solving strategies and methods. Use of the interior design master plan process further promotes the goals and outcomes expressed in the survey by both groups. These include enhanced facility image, the efficient selection of finishes and furnishings, continuity despite staff changes, and overall savings in both costs and time. The interior design master plan allows administrators and facility managers to anticipate changes resulting from the restructuring of health care delivery. The administrators and facility managers are then able to respond in ways that manage those changes in the flexible and cost-effective manner they are striving for. This framework permits staff members to concentrate their time and energy on the care of their patients--which is, after all, what it's all about.

  14. Northeast Oregon Hatchery Project, Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  15. Low Impact Development Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Loftin, Samuel R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-02

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  16. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  17. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  18. Northeast Oregon Hatchery Project conceptual design report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  19. 9 CFR 147.23 - Hatchery sanitation.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Hatchery sanitation. 147.23 Section... AGRICULTURE LIVESTOCK IMPROVEMENT AUXILIARY PROVISIONS ON NATIONAL POULTRY IMPROVEMENT PLAN Sanitation Procedures § 147.23 Hatchery sanitation. An effective program for the prevention and control of Salmonella...

  20. The Chief Joseph Hatchery Program 2013 Annual Report

    Science.gov (United States)

    Baldwin, Casey; Pearl, Andrea; Laramie, Matthew; Rohrback, John; Phillips, Pat; Wolf, Keith

    2016-01-01

    The Chief Joseph Hatchery is the fourth hatchery obligated under the Grand Coulee Dam/Dry Falls project, originating in the 1940s. Leavenworth, Entiat, and Winthrop National Fish Hatcheries were built and operated as mitigation for salmon blockage at Grand Coulee Dam, but the fourth hatchery was not built, and the obligation was nearly forgotten. After the Colville Tribes successfully collaborated with the United States to resurrect the project, planning of the hatchery began in 2001 and construction was completed in 2013. The monitoring program began in 2012 and adult Chinook Salmon were brought on station for the first time in June 2013. BPA is the primary funding source for CJH, and the Mid-Columbia PUDs (Douglas, Grant and Chelan County) have entered into cost-share agreements with the tribes and BPA in order to meet some of their mitigation obligations. The CJH production level was set at 60% in 2013 in order to train staff and test hatchery facility systems during the first year of operation. Leavenworth National Fish Hatchery (LNFH) provided 422 Spring Chinook broodstock in June, 2013; representing the official beginning of CJH operations. In July and August the CCT used a purse seine vessel to collect 814 summer/fall Chinook as broodstock that were a continuation and expansion of the previous Similkameen Pond program. In-hatchery survival for most life stages exceeded survival targets and, as of April 2014, the program was on track to exceed the 60% production target for its start-up year. The CJH monitoring project collected field data to determine Chinook population status, trend, and hatchery effectiveness centered on five major activities; 1) rotary screw traps (juvenile outmigration, natural-origin smolt PIT tagging) 2) beach seine (naturalorigin smolt PIT tagging) 3) lower Okanogan adult fish pilot weir (adult escapement, proportion of hatchery-origin spawners [pHOS], broodstock) 4) spawning ground surveys (redd and carcass surveys)(viable salmonid

  1. Evaluation of the Navy Master Planning Program

    Science.gov (United States)

    1976-05-01

    Navy planning directives, interviews with Navy planning personnel, researc " of applicable literature on planning and program evaluation, and the...master planning has absorbed the additional roles of program management and public relations marketing . The Navy planner is now deeply involved in...master planning 62conducted by NAVFAC headquarters in 1972, various Navy planning directives, a " Market Survey" of NAVFAC services and customer 63

  2. Umatilla Hatchery Monitoring and Evaluation, 1992-1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Keefe, MaryLouise; Hayes, Michael C.; Groberg, Jr., Warren J. (Oregon Department of Fish and Wildlife)

    1994-06-01

    The Umatilla Hatchery is the foundation for rehabilitating chinook salmon and enhancing summer steelhead in the Umatilla River and expected to contribute significantly to the Northwest Power Planning Council`s goal of doubling salmonid production in the Columbia Basin. This report covers the second year of comprehensive monitoring and evaluation of the Umatilla Hatchery. As both the hatchery and the evaluation study are in the early stages of implementation, much of the information contained in this report is preliminary.

  3. Ford Hatchery; Washington Department of Fish and Wildlife Fish Program, Hatcheries Division, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Lovrak, Jon; Ward, Glen

    2004-01-01

    Bonneville Power Administration's participation with the Washington Department of Fish and Wildlife, Ford Hatchery, provides the opportunity for enhancing the recreational and subsistence kokanee fisheries in Banks Lake. The artificial production and fisheries evaluation is done cooperatively through the Spokane Hatchery, Sherman Creek Hatchery (WDFW), Banks Lake Volunteer Net Pen Project, and the Lake Roosevelt Fisheries Evaluation Program. Ford Hatchery's production, together with the Sherman Creek and the Spokane Tribal Hatchery, will contribute to an annual goal of one million kokanee yearlings for Lake Roosevelt and 1.4 million kokanee fingerlings and fry for Banks Lake. The purpose of this multi-agency program is to restore and enhance kokanee salmon and rainbow trout populations in Lake Roosevelt and Banks Lake due to Grand Coulee Dam impoundments. The Ford Hatchery will produce 9,533 lbs. (572,000) kokanee annually for release as fingerlings into Banks Lake in October. An additional 2,133 lbs. (128,000) kokanee will be transferred to net pens on Banks Lake at Electric City in October. The net pen raised kokanee will be reared through the fall, winter, and early spring to a total of 8,533 lbs and released in May. While the origin of kokanee comes from Lake Whatcom, current objectives will be to increase the use of native (or, indigenous) stocks for propagation in Banks Lake and the Upper Columbia River. Additional stocks planned for future use in Banks Lake include Lake Roosevelt kokanee and Meadow Creek kokanee. The Ford Hatchery continues to produce resident trout (80,584 lb. per year) to promote the sport fisheries in trout fishing lakes in eastern Washington (WDFW Management, Region 1). Operation and maintenance funding for the increased kokanee program was implemented in FY 2001 and scheduled to continue through FY 2010. Funds from BPA allow for an additional employee at the Ford Hatchery to assist in the operations and maintenance associated

  4. Housing, health and master planning: rules of engagement.

    Science.gov (United States)

    Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P

    2014-04-01

    Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.

  5. Measures for Management of Land Use Master Plan Released

    Institute of Scientific and Technical Information of China (English)

    Qian Fang; Li Caige

    2017-01-01

    On May 8,2017,the Measures for Management of Land Use Master Plan was released for enforcement by the Ministry of Land and Resources.The Measures clearly points out that a land use master plan is an essential part of the national spatial planning system and an important basis for implementing land use modes control and management,

  6. Hood River production program monitoring and evaluation. Report A: Hood River and Pelton Ladder evaluation studies. Annual report for 1996

    International Nuclear Information System (INIS)

    Olsen, E.A.; French, R.A.

    1996-01-01

    In 1992, the Northwest Power Planning Council approved the Hood River and Pelton Ladder master plans within the framework of the Columbia River Basin Fish and Wildlife Program. The master plans define an approach for implementing a hatchery supplementation program in the Hood River subbasin. The hatchery program, as defined in the master plans, is called the Hood River Production Program (HRPP). The HRPP will be implemented at a reduced hatchery production level until (1) the construction of all proposed hatchery facilities has been completed and (2) numbers of returning wild jack and adult fish are sufficient to meet broodstock collection goals. It is anticipated that construction on the hatchery production facilities will be completed by the spring of 1998. The HRPP is jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Warm Springs (CTWS) Reservation

  7. United States Shipbuilding Standards Master Plan

    National Research Council Canada - National Science Library

    Horsmon, Jr, Albert W

    1992-01-01

    This Shipbuilding Standards Master Plan was developed using extensive surveys, interviews, and an iterative editing process to include the views and opinions of key persons and organizations involved...

  8. SEA effectiveness for landscape and master planning: An investigation in Sardinia

    International Nuclear Information System (INIS)

    De Montis, Andrea; Ledda, Antonio; Caschili, Simone; Ganciu, Amedeo; Barra, Mario

    2014-01-01

    The Italian administrative bodies and planning agencies have embraced with mixed feedbacks the introduction of Strategic Environmental Assessment (SEA) through the European Directive 2001/42/EC. Concurrently, regional and local spatial planning practice have been characterized by a new approach inspired by landscape planning. The Italian region of Sardinia has been one of the pioneering administrative bodies in the Italian and European arena that has adopted landscape principles for the construction of its regional master plan (PPR, Piano Paesaggistico Regionale). Municipalities are now carrying out the review of their master plans to the PPR's prescriptions and indications. Against this background, the aim of this paper is to assess the level of SEA implementation in the municipal master plans of Sardinia, six years after the approval of the PPR. Rooted in the SEA international literature we construct a modular and adaptable on-line survey for officers involved in the review of municipal master plans. The results show that many Sardinian municipalities have not reviewed their master plans to the PPR's regulations yet and only a few municipalities have started this review process according to the SEA procedure. - Highlights: • We study strategic environmental assessment (SEA) effectiveness on land use plans • Four SEA implementation key issues are drawn from international literature • Data collection has included an on-line survey with close and open questions • Results indicate that SEA has been poorly implemented in landscape and master plans • Weak aspects include planning alternatives, financial resources, and monitoring

  9. SEA effectiveness for landscape and master planning: An investigation in Sardinia

    Energy Technology Data Exchange (ETDEWEB)

    De Montis, Andrea, E-mail: andreadm@uniss.it [Dipartimento di Agraria, Sezione Ingegneria del Territorio, Università degli Studi di Sassari, Viale Italia, 39, 07100 Sassari (Italy); Ledda, Antonio, E-mail: antonioledda@gmail.com [Dipartimento di Agraria, Sezione Ingegneria del Territorio, Università degli Studi di Sassari, Viale Italia, 39, 07100 Sassari (Italy); Caschili, Simone, E-mail: s.caschili@ucl.ac.uk [UCL QASER Lab and Centre for Advanced Spatial Analysis, University College London, Gower Street, London WC1E 7HB (United Kingdom); Ganciu, Amedeo, E-mail: dott.amedeoganciu@gmail.com [Dipartimento di Agraria, Sezione Ingegneria del Territorio, Università degli Studi di Sassari, Viale Italia, 39, 07100 Sassari (Italy); Barra, Mario, E-mail: barra@uniss.it [Dipartimento di Agraria, Sezione Ingegneria del Territorio, Università degli Studi di Sassari, Viale Italia, 39, 07100 Sassari (Italy)

    2014-07-01

    The Italian administrative bodies and planning agencies have embraced with mixed feedbacks the introduction of Strategic Environmental Assessment (SEA) through the European Directive 2001/42/EC. Concurrently, regional and local spatial planning practice have been characterized by a new approach inspired by landscape planning. The Italian region of Sardinia has been one of the pioneering administrative bodies in the Italian and European arena that has adopted landscape principles for the construction of its regional master plan (PPR, Piano Paesaggistico Regionale). Municipalities are now carrying out the review of their master plans to the PPR's prescriptions and indications. Against this background, the aim of this paper is to assess the level of SEA implementation in the municipal master plans of Sardinia, six years after the approval of the PPR. Rooted in the SEA international literature we construct a modular and adaptable on-line survey for officers involved in the review of municipal master plans. The results show that many Sardinian municipalities have not reviewed their master plans to the PPR's regulations yet and only a few municipalities have started this review process according to the SEA procedure. - Highlights: • We study strategic environmental assessment (SEA) effectiveness on land use plans • Four SEA implementation key issues are drawn from international literature • Data collection has included an on-line survey with close and open questions • Results indicate that SEA has been poorly implemented in landscape and master plans • Weak aspects include planning alternatives, financial resources, and monitoring.

  10. Willamette Hatchery Oxygen Supplementation Studies : Annual Report 1993.

    Energy Technology Data Exchange (ETDEWEB)

    Ewing, R.D.; Ewing, S.K.; Sheahan, J.E.

    1993-11-01

    Hydropower development and operations in the Columbia River basin have caused the loss of 5 million to 11 million salmonids. An interim goal of the Northwest Power Planning Council is to reestablish these historical numbers by doubling the present adult runs from 2.5 million to 5.0 million fish. This increase in production will be accomplished through comprehensive management of both wild and hatchery fish, but artificial propagation will play a major role in the augmentation process. The current husbandry techniques in existing hatcheries require improvements that may include changes in rearing densities, addition of oxygen, removal of excess nitrogen, and improvement in raceway design. Emphasis will be placed on the ability to increase the number of fish released from hatcheries that survive to return as adults.

  11. Review of Current Aircrew Coordination Training Program and Master Plan for Program Enhancement: Aircrew Coordination Training Master Plan

    National Research Council Canada - National Science Library

    Grubb, G

    2001-01-01

    ...) program to develop a master plan of continuous improvement. Research source materials included policies, training courseware, evaluation guides, research papers and reports, and assessment summaries of operational trend data...

  12. Master plans for pedestrian and bicycle transportation: community characteristics.

    Science.gov (United States)

    Steinman, Lesley; Doescher, Mark; Levinger, David; Perry, Cynthia; Carter, Louise; Eyler, Amy; Aytur, Semra; Cradock, Angie L I; Evenson, Kelly R; Heinrich, Katie; Kerr, Jacqueline; Litt, Jill; Severcan, Yucel; Voorhees, Carolyn

    2010-03-01

    Recent research demonstrates the importance of targeting the built environment to support individual physical activity, particularly for people experiencing health disparities. Master plans to promote biking and/or pedestrians (BPMPs) are a potential method for environmental change. This descriptive study aims to provide a snapshot of plan attributes and better understand demographic, social and transportation characteristics of communities with BPMPs. We collected a census sample of BPMPs from 4 states. Population and commuting data were obtained from national statistics. 294 master plans were included, with most plans representing municipalities. 62% of plans targeted biking only, one-fifth targeted biking and walking, and 15% targeted walking only. The sampled locations have a similar demographic profile as the overall U.S. for median age and household income, people of color, high school education, and income inequality. The degree of racial diversity of sampled communities is slightly less than the U.S. average and the percentage of people who walk to work were slightly higher. Given that communities with master plans have a similar profile as the overall U.S., BPMPs could feasibly be spread to communities throughout the country. Further research is planned to describe BPMPs in detail toward informing future plan development.

  13. Perancangan Master Plan Sistem Informasi Akademik STT Dharma Iswara Madiun

    Directory of Open Access Journals (Sweden)

    Hani Atun Mumtahana

    2016-12-01

    Full Text Available Teknologi Informasi dan Sistem Informasi sudah menjadi hal paling mendasar dalam suatu organisasi dalam menjalankan proses bisnis. Perkembangan Teknologi Informasi dan Sistem Informasi (TI/SI yang baik harus direncanakan dengan baik. Master Plan merupakan suatu pedoman jangka pendek, menengah dan jangka panjang dalam pengembangan TI/SI suatu organisasi/perusahaan. Dalam menjalankan proses bisnis yang disesuaikan dengan Visi, Misi dan Tujuannya, STT Dharma Iswara Madiun lebih menitik beratkan pada Pelayanan Bidang Akademik (disesuaikan dengan gambaran Portofolio Aplikasi. Untuk menghasilkan pelayanan yang prima dalam bidang Akademik, perancangan Master Plan Sistem Informasi Akademik merupakan salah satu cara untuk membuat perencanaan jangka panjang pemeliharaan Sistem Informasi Akademik. Pada penelitian ini perancangan Master Plan Sistem Informasi Akademik dilakukan dengan perumusan Rencana Strategis STT Dharma Iswara Madiun, membuat arsitektur Sistem Informasi dengan framework Zachman 4 kolom (data (what, function (how, network (where dan people (who dan 3 baris (planner, owner dan designer. Hasil penelitian ini berupa rencana pengembangan Sistem Infromasi Akademik dalam bentuk Master Plan pada jangka pendek, jangka menengah dan jangka panjang.

  14. Are master plans effective in limiting development in China's disaster-prone areas?

    OpenAIRE

    Kim, Saehoon; Rowe, Peter G.

    2013-01-01

    The effectiveness of urban master plans in limiting development in a disaster-prone area of China was empirically investigated by measuring cities’ land-cover changes against their master plans. If a master plan serves as guidance for urban polices that reduce property loss from earthquakes, floods, landslides,land subsidence, and rises in sea level, it will substantially limit urban development in areas at risk from environmental hazards. An environmental risk map weighted toward valuable...

  15. Louisiana's 2017 Master Plan for a Sustainable Coast

    Science.gov (United States)

    Haase, B.

    2017-12-01

    The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement

  16. Colville Tribal Fish Hatchery, annual report 2001

    International Nuclear Information System (INIS)

    2001-01-01

    Federal hydropower projects as well as private power utility systems have had a devastating impact upon anadromous fish resources that once flourished in the Columbia River and it's tributaries. Several areas were completely blocked to anadromous fish by dams, causing the native people who's number one food resource was salmon to rely entirely upon resident fish to replace lost fisheries resources. The Colville Tribal Fish Hatchery is an artificial production program to partially mitigate for anadromous fish losses in the ''Blocked Area'' above Chief Joseph and Grand Coulee Dams pursuant to Resident Fish Substitution Policy of the Northwest Power Planning Councils Fish and Wildlife Program. The hatchery was accepted into the Council's Fish and Wildlife Program in 1984 as a resident fish substitution measure and the hatchery was completed in 1990. The minimum production quota for this facility is 22,679 kg (50,000 lbs.) of trout. To achieve this quota the Colville Tribal Hatchery was scheduled to produce 174,000 fingerling rainbow trout (5 grams/fish), 330,000 sub-yearling rainbow trout (15 grams/fish), 80,000 legal size rainbow trout (90 grams/fish), 196,000 fingerling brook trout (5 grams/fish), 330,000 subyearling brook trout (15 grams/fish) and 60,000 lahontan cutthroat trout (15 grams/fish) in 2001. All fish produced are released into reservation waters, including boundary waters in an effort to provide a successful subsistence /recreational fishery for Colville Tribal members as well as a successful non-member sport fishery. The majority of the fish distributed from the facility are intended to provide a ''carry-over'' fishery. Fish produced at the facility are intended to be capable of contributing to the natural production component of the reservation fish populations. Contribution to the natural production component will be achieved by producing and releasing fish of sufficient quality and quantity for fish to survive to spawning maturity, to spawn

  17. Colorado Academic Library Master Plan, Spring 1982.

    Science.gov (United States)

    Breivik, Patricia Senn; And Others

    Based on a need to assess current library strengths and weaknesses and to project potential library roles in supporting higher education, this master plan makes a series of recommendations to Colorado's academic libraries. It is noted that the plan was endorsed by both the Colorado Commission on Higher Education and the Colorado State Department…

  18. Spokane Tribal Hatchery, 2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L. (Spokane Tribe of Indians, Wellpinit, WA)

    2006-03-01

    Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2004 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to rainbow trout catch and harvest rates while the impact on the kokanee fishery was minimal. Success of the Lake Roosevelt kokanee artificial production program appears to be limited primarily owing to predation, precocity and high entrainment rates through Grand Coulee Dam. Recommendations for future hatchery/net pen operations include use of stocks compatible or native to the upper Columbia River, continue kokanee fry and post-smolt releases, 100% triploid hatchery stock rainbow trout used and adipose fin clip hatchery stock rainbow trout prior to release. The Spokane Tribal Hatchery is funded by the Bonneville Power Administration under directives by the Northwest Power Conservation Council Columbia River Basin Fish & Wildlife Program, Resident Fish Substitution Measures, 1987 to current (Subbasin Plan), as partial mitigation for anadromous and resident fish losses in the blocked areas above Chief Joseph and Grand Coulee Dams.

  19. Master planning for successful safeguard/security systems engineering

    International Nuclear Information System (INIS)

    Bruckner, D.G.

    1987-01-01

    The development and phased implementation of an overall master plan for weapons systems and facilities engaged in the complexities of high technology provides a logical road map for system accomplishment. An essential factor in such a comprehensive plan is development of an integrated systems security engineering plan. Some DOD programs use new military regulations and policy directives to mandate consideration of the safeguard/security disciplines be considered for weapons systems and facilities during the entire life cycle of the program. The emphasis is to make certain the weapon system and applicable facilities have complementary security features. Together they must meet the needs of the operational mission and, at the same time, provide the security forces practical solutions to their requirements. This paper discusses the process of meshing the safe- guards/security requirements with an overall the master plan and the challenges attendant to this activity

  20. Development of Facilities Master Plan and Laboratory Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Andrea D

    2011-10-03

    Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the School's overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

  1. AUA Program Master Plan. Volume 1: Overview

    Science.gov (United States)

    1997-03-01

    The Office of Air Traffic Systems Development (AUA) Program Master Plan : summarizes the management, development approach, and status of products and : services provided by the AUA organization to fulfill its role in supporting : National Airspace Sy...

  2. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan.

    Science.gov (United States)

    2012-06-01

    Border Master Plans document a regions needs and priorities, and recommend a mechanism to ensure coordination on current and planned future port of entry (POE) projects and supporting transportation infrastructure to serve the anticipated demand i...

  3. Homeroom Activities in a College of Technology Based on the Master Plan

    Science.gov (United States)

    Fuchida, Kunihiiko; Murata, Hideaki; Yuji, Junichiro

    Homeroom (HR) activities have an important role in engineering education at technical colleges. Yatsushiro National College of Technology has made a master plan for them and has been putting the plan into practical use since 2002. This plan is comprehensive and has two main categories, social education and career guidance, both being composed of three sub-categories (e.g., self-understanding and making future plans) . Based on the master plan, each HR teacher makes his own plan for HR activities for his classroom at the beginning of the academic year. We have reached a consensus to share our practice and to improve HR activities for years to come. We also recognize that to carry out HR activities based on a master plan that reflects the school's educational goals is essential in order to train students who are well-prepared, both as engineers and as humans.

  4. Nez Perce tribal hatchery project : combined-planning and design and operations and maintenance reports, annual report, 2000

    International Nuclear Information System (INIS)

    Larson, Roy Edward; Walker, Grant

    2002-01-01

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O and M) and Planning and Design (P and D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002

  5. Colville Tribal Fish Hatchery, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Arteburn, John; Christensen, David (Colville Confederated Tribes, Nespelem, WA)

    2003-03-01

    Federal hydropower projects as well as private power utility systems have had a devastating impact upon anadromous fish resources that once flourished in the Columbia River and it's tributaries. Several areas were completely blocked to anadromous fish by dams, causing the native people who's number one food resource was salmon to rely entirely upon resident fish to replace lost fisheries resources. The Colville Tribal Fish Hatchery is an artificial production program to partially mitigate for anadromous fish losses in the ''Blocked Area'' above Chief Joseph and Grand Coulee Dams pursuant to Resident Fish Substitution Policy of the Northwest Power Planning Councils Fish and Wildlife Program. The hatchery was accepted into the Council's Fish and Wildlife Program in 1984 as a resident fish substitution measure and the hatchery was completed in 1990. The minimum production quota for this facility is 22,679 kg (50,000 lbs.) of trout. To achieve this quota the Colville Tribal Hatchery was scheduled to produce 174,000 fingerling rainbow trout (5 grams/fish), 330,000 sub-yearling rainbow trout (15 grams/fish), 80,000 legal size rainbow trout (90 grams/fish), 196,000 fingerling brook trout (5 grams/fish), 330,000 subyearling brook trout (15 grams/fish) and 60,000 lahontan cutthroat trout (15 grams/fish) in 2001. All fish produced are released into reservation waters, including boundary waters in an effort to provide a successful subsistence /recreational fishery for Colville Tribal members as well as a successful non-member sport fishery. The majority of the fish distributed from the facility are intended to provide a ''carry-over'' fishery. Fish produced at the facility are intended to be capable of contributing to the natural production component of the reservation fish populations. Contribution to the natural production component will be achieved by producing and releasing fish of sufficient quality and quantity for

  6. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    Science.gov (United States)

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  7. Master-planned in exurbia: examining the drivers and impacts of master-planned communities at the urban fringe

    Science.gov (United States)

    Jenna H. Tilt; Lee. Cerveny

    2013-01-01

    Smart growth strategies of infill and compact growth in existing suburban cities will most likely not be sufficient to absorb a new US household growth in the future. To meet housing demands and preferences, master-planned communities will continue to be built in outlying exurban areas. However, little is known about the impacts these communities may have on the...

  8. Minimizing Lid Overstows in Master Stowage Plans for Container Vessels is NP-Complete

    DEFF Research Database (Denmark)

    Ajspur, Mai Lise; Jensen, Rune Møller; Guilbert, Nicolas

    Container vessel stowage is a particularly hard combinatorial problem within the shipping industry. The currently most successful approaches decompose the problem hierarchically and first generate a master plan that handle highlevel constraints and objectives such as balance and stress moments...... that it is an NP -complete problem to generate master plans that minimize the number of these lid overstows. Since any efficient approach to container vessel stowage most likely must include a master plan, the implication of this result is that future research must focus and developing good heuristics...

  9. Developing Scientific Index System of Urban Master Planning

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>Master plan is the fundamental basis for urban construction and administration, an important public policy of the govern-ments, as well as an overall, comprehen-sive, and strategic task related to politics, economy,

  10. Structural master plan of flood mitigation measures

    OpenAIRE

    A. Heidari

    2009-01-01

    Flood protection is one of the practical methods in damage reduction. Although it not possible to be completely protected from flood disaster but major part of damages can be reduced by mitigation plans. In this paper, the optimum flood mitigation master plan is determined by economic evaluation in trading off between the construction costs and expected value of damage reduction as the benefits. Size of the certain mitigation alternative is also be obtained by risk analysis by accepting possi...

  11. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan : executive summary.

    Science.gov (United States)

    2012-06-01

    Border Master Plans, as defined and supported by the U.S./Mexico Joint Working : Committee on Transportation Planning and Programming, the Federal Highway Administration, : and the U.S. Department of State, are comprehensive long range plans to inven...

  12. Integration of Environmental Planning Into the Army Master Planning Process

    Science.gov (United States)

    1992-10-01

    the issues specific to the later assessment (ETL 1110-3-407, pp 1-9 to 1-10). Under the : estructured master planning process discussed in this report...Lisa~m 0111utHars M143 AMW PRO*b LAMM~e 0)3. AMW uaides, Uso ~ow (M Port RJ." 21719 7%s pubhicaton was repfodaaced on moycled V&Mp. /| / 121 DATEI:

  13. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Golder Associates, Inc.

    2003-04-22

    The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a

  14. The Effect of Modeling Qualities, Tones and Gages in Ceramic Supply Chains' Master Planning

    Directory of Open Access Journals (Sweden)

    Isabel MUNDI

    2012-01-01

    Full Text Available Ceramic production processes are characterized by providing quantities of the same finished goods that differ in qualities, tones and gages. This aspect becomes a problem for ceramic supply chains (SCs that should promise and serve customer orders with homogeneous quantities of the same finished good. In this paper a mathematical programming model for the cen-tralized master planning of ceramic SC is proposed. Inputs to the master plan include demand forecasts in terms of customer order classes based on their order size and splitting percentages of a lot into homogeneous sub-lots. Then, the master plan defines the size and loading of lots to production lines and their distribution with the aim of maximizing the number of customer orders fulfilled with homogeneous quantities in the most efficient manner for the SC. Finally, the effect of modeling qualities, tones and gages in master planning is assessed.

  15. Rapid River Hatchery - Spring Chinook, Final Report

    International Nuclear Information System (INIS)

    Watson, M.

    1996-05-01

    This report presents the findings of the independent audit of the Rapid River Hatchery (Spring Chinook). The hatchery is located in the lower Snake River basin near Riggins Idaho. The hatchery is used for adult collection, egg incubation, and rearing of spring chinook. The audit was conducted in April 1996 as part of a two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the US Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife

  16. A test for the relative strength of maternal and stock effects in spring Chinook salmon (Oncorhynchus tshawytscha) from two different hatcheries (Study site: Warm Springs Hatchery; Stocks: Warm Springs Hatchery and Carson Hatchery; Year class: 1993): Chapter 10

    Science.gov (United States)

    Wetzel, Lisa A.; Rubin, Stephen P.; Reisenbichler, Reginald R.; Stenberg, Karl D.; Rubin, Stephen P.; Reisenbichler, Reginald R.; Wetzel, Lisa A.; Hayes, Michael C.

    2012-01-01

    An experiment was undertaken to determine the relative strength of maternal and stock effects in Chinook salmon (Oncorhynchus tshawytscha) reared in a common environment, as a companion study to our investigation of hatchery and wild Chinook salmon. Pure-strain and reciprocal crosses were made between two hatchery stocks (Carson and Warm Springs National Fish Hatcheries). The offspring were reared together in one of the hatcheries to the smolt stage, and then were transferred to a seawater rearing facility (USGS-Marrowstone Field Station). Differences in survival, growth and disease prevalence were assessed. Fish with Carson parentage grew to greater size at the hatchery and in seawater than the pure-strain Warm Springs fish, but showed higher mortality at introduction to seawater. The analyses of maternal and stock effects were inconclusive, but the theoretical responses to different combinations of maternal and stock effects may be useful in interpreting stock comparison studies.

  17. Quality control of brachytherapy system module Oncentra MasterPlan V3.3 planning; Control de calidad del modulo de braquiterapia del sistema de planificacion Oncentra MasterPlan V3.3

    Energy Technology Data Exchange (ETDEWEB)

    Monja Ray, P. de la; Torres Pozas, S.; Sanchez Carrascal, M.; Macias Verde, D.; Martin Oliva, R.

    2011-07-01

    We present the results of quality control carried out the planning system (SP) MasterPlan Oncentra Brachy, version 3.3 (Nucletron), on the occasion of its launch, following the recommendations proposed in the Protocol for quality control in planning systems therapy with ionizing radiation [SEFM, published by the Spanish Society of Medical Physics (SEFM) in 2005].

  18. Columbia River Hatchery Reform System-Wide Report.

    Energy Technology Data Exchange (ETDEWEB)

    Warren, Dan [Hatchery Scientific Review Group

    2009-04-16

    The US Congress funded the Puget Sound and Coastal Washington Hatchery Reform Project via annual appropriations to the US Fish and Wildlife Service (USFWS) beginning in fiscal year 2000. Congress established the project because it recognized that while hatcheries have a necessary role to play in meeting harvest and conservation goals for Pacific Northwest salmonids, the hatchery system was in need of comprehensive reform. Most hatcheries were producing fish for harvest primarily to mitigate for past habitat loss (rather than for conservation of at-risk populations) and were not taking into account the effects of their programs on naturally spawning populations. With numerous species listed as threatened or endangered under the Endangered Species Act (ESA), conservation of salmon in the Puget Sound area was a high priority. Genetic resources in the region were at risk and many hatchery programs as currently operated were contributing to those risks. Central to the project was the creation of a nine-member independent scientific review panel called the Hatchery Scientific Review Group (HSRG). The HSRG was charged by Congress with reviewing all state, tribal and federal hatchery programs in Puget Sound and Coastal Washington as part of a comprehensive hatchery reform effort to: conserve indigenous salmonid genetic resources; assist with the recovery of naturally spawning salmonid populations; provide sustainable fisheries; and improve the quality and cost-effectiveness of hatchery programs. The HSRG worked closely with the state, tribal and federal managers of the hatchery system, with facilitation provided by the non-profit organization Long Live the Kings and the law firm Gordon, Thomas, Honeywell, to successfully complete reviews of over 200 hatchery programs at more than 100 hatcheries across western Washington. That phase of the project culminated in 2004 with the publication of reports containing the HSRG's principles for hatchery reform and recommendations

  19. Spokane Tribal Hatchery, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L. (Spokane Tribe of Indians, Wellpinit, WA)

    2004-05-01

    Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting a harvestable fishery for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). A collaborative multi-agency artificial production program for the Lake Roosevelt and Banks Lake fisheries exists consisting of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery and the Lake Roosevelt Kokanee and Rainbow Trout Net Pen Rearing Projects. These projects operate complementary of one another to target an annual release of 1 million yearling kokanee and 500,000 yearling rainbow trout for Lake Roosevelt and 1.4 million kokanee fry/fingerlings for Banks Lake. Combined fish stocking by the hatcheries and net pen rearing projects in 2003 included: 899,168 kokanee yearlings released into Lake Roosevelt; 1,087,331 kokanee fry/fingerlings released into Banks Lake, 44,000 rainbow trout fingerlings and; 580,880 rainbow trout yearlings released into Lake Roosevelt. Stock composition of 2003 releases consisted of Lake Whatcom kokanee, 50:50 diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2003 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to harvestable rainbow trout and kokanee salmon fisheries. An increase in kokanee harvest was primarily owing to new release strategies. Walleye predation, early maturity and entrainment through Grand Coulee Dam continues to

  20. "Hospital Master Plan'ist" haiglavõrgu arengukavani / Tarmo Bakler

    Index Scriptorium Estoniae

    Bakler, Tarmo, 1970-

    2003-01-01

    Ülevaade, kuidas Hospital Master Planìs toodud põhimõtteid on kasutatud praeguseni elluviidud muutuste tegemisel ja kuidas on HMPd täiendatud Eesti Tervishoiuprojekt 2015 koostatud haiglavõrgu arengukavas 2002. Kaart. Tabelid

  1. Methodical approaches in the Norwegian Master Plan for Water Resources

    International Nuclear Information System (INIS)

    Bowitz, Einar

    1997-01-01

    The Norwegian Master Plan for Water Resources instructs the management not to consider applications for concession to develop hydroelectric projects in the so called category II of the plan. These are the environmentally most controversial projects or the most expensive projects. This report discusses the methods used in this Master Plan to classify the projects. The question whether the assessments of the environmental disadvantages of hydropower development are reasonable is approached in two ways: (1) Compare the environmental costs imbedded in the Plan with direct assessments, and (2) Discuss the appropriateness of the methodology used for environmental evaluations in the Plan. The report concludes that (1) the environmental costs that can be derived from the ranking in the Plan are significantly greater than those following from direct evaluations, (2) the differences are generally so great that one may ask whether the methods used in the Plan overestimate the real environmental costs, (3) it seems to have been difficult to make a unified assessment of the environmental disadvantages, (4) the Plan has considered the economic impact on agriculture and forestry very roughly and indirectly, which may have contributed to overestimated environmental costs of hydropower development. 20 refs., 6 figs., 7 tabs

  2. Cooperative Path Planning and Constraints Analysis for Master-Slave Industrial Robots

    Directory of Open Access Journals (Sweden)

    Yahui Gan

    2012-09-01

    Full Text Available A strategy of cooperative path planning for a master-slave multiple robot system is presented in this paper. The path planning method is based on motion constraints between the end-effectors of cooperative robots. Cooperation motions have been classified into three types by relative motions between end-effectors of master and slave robots, which is concurrent cooperation, coupled synchronous cooperation and combined synchronous cooperation. Based on this classification, position /orientation constraints and joint velocity constraints are explored in-depth here. In order to validate the path planning method and the theoretical developments in motion constraints analysis, representative experiments based on two industrial robots, Motoman VA1400 and HP20, are provided at the end of the paper. The experimental results have proved both the effectiveness of the path planning method and the correctness of the constraints analysis.

  3. Master plan for remediation of the Sillamaee tailings pond and technical design project

    International Nuclear Information System (INIS)

    Kaasik, T.

    2000-01-01

    Remediation of the Sillamaee radioactive tailings pond is a priority in the Estonian National Environmental Plan. The Sillamaee plant has processed metal ores by hydrometallurgical methods since 1946. Processing continued until 1990, but in the 1970s, production of rare earths and rare metals was introduced and continues today at a smaller scale. The tailings pond contains residues from these operations. The environmental problems associated with the tailings pond are the stability of the dam and the release of contaminants. In order to deal with these two issues effectively, a master plan was drawn up. The master plan covers the period from 1997 to 2008 and was compiled with the cooperation of the Silmet Group and the Sillamaee International Expert Reference Group (SIERG). The master plan sets up a systematic approach for the overall tailings pond remediation, including drying its interior, reshaping and covering the surface, minimizing water flow through the tailings, and ensuring long-term dam stability

  4. A master plan for the radwaste management

    International Nuclear Information System (INIS)

    Kim, Y.E.; Lee, S.H.; Lee, C.K.; Moon, S.H.; Sung, R.J.; Sung, K.W.

    1983-01-01

    The accumulated total amount of low-level radioactive wastes to be produced from operating power reactors and nuclear installations up until the year 2007 is estimated to 900,000 drum(approximately 200,000M 3 ). An effective master plan for the safe disposal of the wastes is necessary. Among many different disposal methods available for low-and medium-level radwastes, the engineered trench approach was chosen by an extensive feasibility study as the optimum method for Korea. Site selection, construction and commissioning of such a disposal facility are presumed to take two and a half years, beginning in July 1983. The total cost in opening the site and the unit disposal cost per drum were estimated to be 11 billion won and 40,000 won, respectively. An agency(KORDA) managing the operation of the disposal site is recommended to be established by 1987, assuming that the agency's economic feasibility can be justified by that time. When the disposal site is commissioned, a regulatory guide for ground disposal will be available, and supporting R and D work on the disposal site will be complete. Studies on the technology of radwaste treatment will continue through this period. For the longer term, staff training and future planning have been undertaken to ensure that a master plan, which can be expected to be used as a guideline for disposal of all radioactive waste arising, is fully adequate. (Author)

  5. Spokane Tribal Hatchery, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L. (Spokane Tribe of Indians, Wellpinit, WA)

    2005-03-01

    Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting a harvestable fishery for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). A collaborative multi-agency artificial production program for the Lake Roosevelt and Banks Lake fisheries exists consisting of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery and the Lake Roosevelt Kokanee and Rainbow Trout Net Pen Rearing Projects. These projects operate complementary of one another to target an annual release of 1 million yearling kokanee and 500,000 yearling rainbow trout for Lake Roosevelt and 1.4 million kokanee fry/fingerlings for Banks Lake. Fish produced by this project in 2004 to meet collective fish production and release goals included: 1,655,722 kokanee fingerlings, 537,783 rainbow trout fingerlings and 507,660 kokanee yearlings. Kokanee yearlings were adipose fin clipped before release. Stock composition consisted of Lake Whatcom kokanee, 50:50 diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2004 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to harvestable rainbow trout and kokanee salmon fisheries. An increase in kokanee harvest was primarily owing to new release strategies. Walleye predation, early maturity and entrainment through Grand Coulee Dam continues to have a negative impact on adult kokanee returns and limits the

  6. Lyons Ferry Hatchery - Summer Steelhead, Final Report

    International Nuclear Information System (INIS)

    Watson, M.

    1996-05-01

    This report presents the findings of the independent audit of the Lyons Ferry Hatchery (Summer Steelhead). Lyons Ferry Hatchery is located downstream of the confluence of the Palouse and Snake rivers, about 7 miles west of Starbuck, Washington. The hatchery is used for adult collection of fall chinook and summer steelhead, egg incubation of fall chinook, spring chinook, steelhead, and rainbow trout and rearing of fall chinook, spring chinook, summer steelhead, and rainbow trout. The audit was conducted in April 1996 as part of a two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the US Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife

  7. StreamNet Query System: Hatchery Returns

    Data.gov (United States)

    Pacific States Marine Fisheries Commission — These trends include all counts of fish obtained at a hatchery or one of its satellite facilities. The only method allowed is hatchery rack / weir, and the count...

  8. Master plan nurse duty roster using the 0-1 goal programming technique

    Science.gov (United States)

    Ismail, Wan Rosmanira; Jenal, Ruzzakiah

    2013-04-01

    The scheduling of nurses is particularly challenging because of the nature of the work which is around the clock. In addition, inefficient duty roster can have an effect on the nurses well being as well as their job satisfaction. In nurse scheduling problem (NSP), nurses are generally allocated to periods of work over a specified time horizon. A typical length of the schedule varies from a few weeks to a month. The schedule will be consistently rebuilt after the specified time period and will result in a time-consuming task for the administrative staff involved. Moreover, the task becomes overwhelming when the staff needs to consider the previous duty rosters in order to maintain the quality of schedules. Therefore, this study suggests the development of a master plan for a nurse duty roster for approximately one year. The master plan starts with the development of a blue print for the nurse duty roster using a 0-1 goal programming technique. The appropriate working period for this blue print is formulated based on the number of night shifts and the number of required nurses for night shift per schedule. Subsequently, the blue print is repeated to complete the annual nurse duty roster. These newly developed procedures were then tested on several data sets. The test results found that the master plan has successfully distributed the annual workload evenly among nurses. In addition, the master plan allows nurses to arrange their career and social activities in advance.

  9. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  10. Succession, Development and Innovation of the Master Plan of Beijing

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    <正> The Master Plan of Beijing (2004 - 2020),approved in January 2005 by the State Council, is an important strategic, holistic and comprehensive plan for Beijing to face the new century, to realize the stra-tegic proposition of"New Beijing, Great Olympics", and to fully push forward the harmonious and sustainable development of economy, society, population, resources and environment.

  11. Nuclear safety research master plan

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Joo; Yang, J. U.; Jun, Y. S. and others

    2001-06-01

    The SRMP (Safety Research Master Plan) is established to cope with the changes of nuclear industry environments. The tech. tree is developed according to the accident progress of the nuclear reactor. The 11 research fields are derived to cover the necessary technologies to ensure the safety of nuclear reactors. Based on the developed tech. tree, the following four main research fields are derived as the main safety research areas: 1. Integrated nuclear safety enhancement, 2. Thermal hydraulic experiment and assessment, 3. Severe accident management and experiment, and 4. The integrity of equipment and structure. The research frame and strategies are also recommended to enhance the efficiency of research activity, and to extend the applicability of research output.

  12. Changing Perspectives on the Planning of Ankara (1924-2007 and Lessons for a New Master-Planning Approach to Developing Cities

    Directory of Open Access Journals (Sweden)

    Olgu Çalişkan

    2014-07-01

    Full Text Available As one of the newly planned capitals in the 20th century – like Islamabad, Canberra and Brazil –, Ankara represents an original case in planning history: from shaping a new town under the influence of early European urbanism to the control of a dynamic metropolitan form by structural planning approaches. Forming its urban core according to the initial planning perspectives between the beginning of 1930s and the mid-1970s, the city has entered a rapid phase of space production in its extensions for about the last thirty years.In the current period of development, highly fragmented urban peripheral formation has being occurred in Ankara. Since the existing trend on the dispersion of urban form lacking spatial coherence at different scale-levels causes the dominance of the private domain and a loss of urbanity, this trend might at first glance be considered as a break with the European tradition and the emergence of Anglo-Americanization in Turkish planning system in terms of looser development control approach on urban form.Before, coming to such a critical end-point, the paper prefers a closer look into the changing dynamics of master plans of the city. It is aimed to reveal the developmental logic of the city by means of master plan analysis. The comprehensive outlook – called plan matrix – is integrated into each master plan schema by correlating the basic components like main policy directions, depth of control, settlement typology, and city structure and form. Such a framework has a potential to be utilized for any kind of plan analysis at metropolitan scale for different cases. At the end of the analysis, the paper tends to address an alternative master planning approach for the similar types of developing cities striving for keeping its urban character within a fragmented urban body.

  13. THE NIGERIAN GAS MASTER-PLAN, INVESTMENT OPPORTUNITIES, CHALLENGES, ISSUES AFFECTING POWER SECTOR: AN ANALYSIS

    Directory of Open Access Journals (Sweden)

    R. INGWE

    2014-11-01

    Full Text Available The Nigerian Gas Master-Plan, Investment Opportunities, Challenges, Issues Affecting Power Sector: an Analysis. The objective of this article is to contribute towards understanding of the Nigerian Gas Master Plan (NGMP/Plan and its bifurcations with key socio-economic development factors. I applied the method of discourse to bring to being some points that have hitherto been unknown about the Master-plan and its inter-relationships and bifurcations. Elaborated here are the spectacular gains that have accrued to the Latin American country, Trinidad and Tobago, from its recent development of natural gas resources. This was considered suitable and significant here for highlighting that if such spectacular achievements could be realized from Trinidad and Tobago’s relatively smaller gas deposit (15.3 tcf, probable reserves (8.4 tcf, possible reserves (6.2 tcf would be by far greater considering Nigeria’s larger natural gas reserves (184 tcf wealth as earlier stated. I show that the Plan is well designed relevant to addressing Nigeria’s current development needs generally. It presents potentials for stimulating Nigeria’s economic growth by harnessing the country’s abundant natural gas reserves. The Plan enumerates/ elaborates huge investment opportunities. Some challenges likely to be faced in the implementation/management of the Plan are already being surmounted as recent reports show that some of its key investments have been realized and the required infrastructure are being provided. Regarding the issues in the Master-plan that are likely to affect and are affecting Nigeria’s power sector development, I reckon that they are mostly positive factors due to the way the plan promises to stimulate electricity generation in our country.

  14. Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2005 Annual Operation Plan, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Harty, Harold R.; Lundberg, Jeffrey H.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-02-01

    The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

  15. Freezing the Master Production Schedule Under Rolling Planning Horizons

    OpenAIRE

    V. Sridharan; William L. Berry; V. Udayabhanu

    1987-01-01

    The stability of the Master Production Schedule (MPS) is a critical issue in managing production operations with a Material Requirements Planning System. One method of achieving stability is to freeze some portion or all of the MPS. While freezing the MPS can limit the number of schedule changes, it can also produce an increase in production and inventory costs. This paper examines three decision variables in freezing the MPS: the freezing method, the freeze interval length, and the planning ...

  16. Colville Tribal Fish Hatchery, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Arteburn, John; Christensen, David (Colville Confederated Tribes, Nespelem, WA)

    2003-03-01

    Federal hydropower projects as well as private power utility systems have had a major negative impact upon anadromous fish resources that once flourished in the Columbia River and it's tributaries. Several areas have been completely blocked to anadromous fish by dams, destroying the primary food resource (salmon) for many native people forcing them to rely heavily upon resident fish to replace these lost resources. The Colville Tribal Fish Hatchery is an artificial production program that addresses the loss of anadromous fish resources in the Upper Columbia Sub-Region within the ''blocked area'' created by the construction of Chief Joseph and Grand Coulee Dams. This project enhances resident fisheries located in the Intermountain and Columbia Cascade Provinces, specifically within the Colville Reservation portion of the Upper Columbia, SanPoil and Oakanogan Sub-Basins. The project partially mitigates for anadromous fish losses through protection/augmentation of resident fish populations to enhance fishery potential (i.e. in-place, out-of-kind mitigation) pursuant to Resident Fish Substitution Policy of the Northwest Power Planning Councils Fish and Wildlife Program. The hatchery was accepted into the Council's Fish and Wildlife Program in 1984 and the hatchery was completed in 1990. The Colville Tribal Hatchery (CTH) is located on the northern bank of the Columbia River just down stream of the town of Bridgeport, Washington that is just down stream of Chief Joseph Dam. The hatchery is located on land owned by the Colville Tribes. The minimum production quota for this facility is 22,679 kg (50,000 lbs.) of trout annually. All fish produced are released into reservation waters, including boundary waters in an effort to provide a successful subsistence/recreational fishery for Colville Tribal members and provide for a successful nonmember sport fishery. The majority of the fish distributed from the facility are intended to support &apos

  17. Radiotherapy facilities: Master planning and concept design considerations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-08-15

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology, a typical project work plan and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals.

  18. Radiotherapy facilities: Master planning and concept design considerations

    International Nuclear Information System (INIS)

    2014-01-01

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology, a typical project work plan and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals

  19. Handling and Treatment of Poultry Hatchery Waste: A Review

    Directory of Open Access Journals (Sweden)

    Belinda Rodda

    2011-01-01

    Full Text Available A literature review was undertaken to identify methods being used to handle and treat hatchery waste. Hatchery waste can be separated into solid waste and liquid waste by centrifuging or by using screens. Potential methods for treating hatchery waste on site include use of a furnace to heat the waste to produce steam to run a turbine generator or to use an in line composter to stabilise the waste. There is also potential to use anaerobic digestion at hatcheries to produce methane and fertilisers. Hatcheries disposing wastewater into lagoons could establish a series of ponds where algae, zooplankton and fish utilise the nutrients using integrated aquaculture which cleans the water making it more suitable for irrigation. The ideal system to establish in a hatchery would be to incorporate separation and handling equipment to separate waste into its various components for further treatment. This would save disposal costs, produce biogas to reduce power costs at plants and produce a range of value added products. However the scale of operations at many hatcheries is too small and development of treatment systems may not be viable.

  20. 75 FR 15430 - Chief Joseph Hatchery Program

    Science.gov (United States)

    2010-03-29

    ... production program and hatchery facilities. The National Oceanic and Atmospheric Administration's National... DEPARTMENT OF ENERGY Bonneville Power Administration Chief Joseph Hatchery Program AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record...

  1. California Master Plan for Migrant Education, 1976 Edition (Plan Maestro de California para Educacion Migrante, Edicion de 1976).

    Science.gov (United States)

    California State Dept. of Education, Sacramento. Div. of Compensatory Education.

    Based on the national migrant education plan, California's master plan aims to mobilize the necessary State and Federal resources, and to unify and assist the efforts of local educational agencies to end the migrant child's failure in school. The plan includes provisions for: instructional activities on a regular and extended year basis designed…

  2. Implementation plan for HANDI 2000 TWRS master equipment list

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products

  3. Genetic versus rearing-environment effects on phenotype: hatchery and natural rearing effects on hatchery- and wild-born coho salmon.

    Directory of Open Access Journals (Sweden)

    Cedar M Chittenden

    Full Text Available With the current trends in climate and fisheries, well-designed mitigative strategies for conserving fish stocks may become increasingly necessary. The poor post-release survival of hatchery-reared Pacific salmon indicates that salmon enhancement programs require assessment. The objective of this study was to determine the relative roles that genotype and rearing environment play in the phenotypic expression of young salmon, including their survival, growth, physiology, swimming endurance, predator avoidance and migratory behaviour. Wild- and hatchery-born coho salmon adults (Oncorhynchus kisutch returning to the Chehalis River in British Columbia, Canada, were crossed to create pure hatchery, pure wild, and hybrid offspring. A proportion of the progeny from each cross was reared in a traditional hatchery environment, whereas the remaining fry were reared naturally in a contained side channel. The resulting phenotypic differences between replicates, between rearing environments, and between cross types were compared. While there were few phenotypic differences noted between genetic groups reared in the same habitat, rearing environment played a significant role in smolt size, survival, swimming endurance, predator avoidance and migratory behaviour. The lack of any observed genetic differences between wild- and hatchery-born salmon may be due to the long-term mixing of these genotypes from hatchery introgression into wild populations, or conversely, due to strong selection in nature--capable of maintaining highly fit genotypes whether or not fish have experienced part of their life history under cultured conditions.

  4. Evaluation of the Reproductive Success of Wild and Hatchery Steelhead in Hatchery and Natural and Hatchery Environments : Annual Report for 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Quinn, Thomas P.; Seamons, todd; Hauser, Lorenz; Naish, Kerry

    2008-12-05

    This report summarizes the field, laboratory, and analytical work from December 2007 through November 2008 on a research project that investigates interactions and comparative reproductive success of wild and hatchery origin steelhead (Oncorhynchus mykiss) trout in Forks Creek, a tributary of the Willapa River in southwest Washington. First, we continued to successfully sample hatchery and wild (i.e., naturally spawned) adult and wild smolt steelhead at Forks Creek. Second, we revealed microsatellite genotype data for adults and smolts through brood year 2008. Finally, four formal scientific manuscripts were published in 2008 and two are in press, one is in revision and two are in preparations.

  5. Hood River Steelhead Genetics Study; Relative Reproductive Success of Hatchery and Wild Steelhead in the Hood River, Final Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Blouin, Michael

    2003-05-01

    There is a considerable interest in using hatcheries to speed the recovery of wild populations. The Bonneville Power Administration (BPA), under the authority of the Northwest Power Planning Act, is currently funding several hatchery programs in the Columbia Basin as off-site mitigation for impacts to salmon and steelhead caused by the Columbia River federal hydropower system. One such project is located on the Hood River, an Oregon tributary of the Columbia. These hatchery programs cost the region millions of dollars. However, whether such programs actually improve the status of wild fish remains untested. The goal of this project was to evaluate the effectiveness of the Hood River hatchery program as required by the Northwest Power Planning Council Fish and Wildlife Program, by the Oregon Plan for Coastal Salmonids, by NMFS ESA Section 4(d) rulings, and by the Oregon Department of Fish and Wildlife (ODFW) Wild Fish Management Policy (OAR 635-07-525 through 529) and the ODFW Hatchery Fish Gene Resource Management Policy (OAR 635-07-540 through 541). The Hood River supports two populations of steelhead, a summer run and a winter run. They spawn only above the Powerdale Dam, which is a complete barrier to all salmonids. Since 1991 every adult passed above the dam has been measured, cataloged and sampled for scales. Therefore, we have a DNA sample from every adult steelhead that went over the dam to potentially spawn in the Hood River from 1991 to the present. Similar numbers of hatchery and wild fish have been passed above the dam during the last decade. During the 1990's 'old' domesticated hatchery stocks of each run (multiple generations in the hatchery, out-of-basin origin; hereafter H{sub old}) were phased out, and conservation hatchery programs were started for the purpose of supplementing the two wild populations (hereafter 'new' hatchery stocks, H{sub new}). These samples gave us the unprecedented ability to estimate, via

  6. OPS Master

    Data.gov (United States)

    US Agency for International Development — OPS Master is a management tool and database for integrated financial planning and portfolio management in USAID Missions. Using OPS Master, the three principal...

  7. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  8. ORCWM test and evaluaton master plan. Revision 00

    International Nuclear Information System (INIS)

    1995-08-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Test and Evaluation Master Plan (TEMP) describes the program Test and Evaluation (T ampersand E) policy, objectives, requirements, general methodology (test flow and description of each T ampersand E phase), responsibilities, and scheduling of test phases for the Civilian Radioactive Waste Management System (CRWMS). This TEMP is a program-level management planning document for al CRWMS T ampersand E activities and will be used in conjunction with Section 11 of the Quality Assurance Requirements and Description (QARD), as appropriate, as a guide for the projects in developing their T ampersand E plans. In the OCRWM document hierarchy, that is described in the OCRWM Systems Engineering Management Plan (SEMP), the TEMP is subordinate to the program SEMP. To ensure CRWMS operates as an integrated system, the plans for verifying the performance and evaluating the operational suitability and effectiveness of the overall system are also described. Test and evaluation is an integral part of the systems engineering process. Key aspects of the systems engineering process, more fully described in the OCRWM SEMP, are discussed in this TEMP to illustrate how T ampersand E supports the overall systems engineering process

  9. The Challenges of Implementing Sustainable Development: The Case of Sofia’s Master Plan

    Directory of Open Access Journals (Sweden)

    Aleksandar D. Slaev

    2016-12-01

    Full Text Available In this paper, we explore how master planning promotes and implements particular urban development patterns and, more generally, contributes to sustainability. Our goal is to understand the link between urban growth intentions articulated through the master planning process and realisation of its specific forms, e.g., monocentric or polycentric, compact or dispersed. As a case study, we examine the current General Urban Development Plan (GUDP of the Bulgarian capital Sofia against the city’s actual development pattern. We observe that the primary goals of the GUDP are to promote a polycentric urban structure and low-density expansion, as well as preserve green edges. While the question of whether and how these goals reflect the sustainability ideal requires further consideration, there are some indications that Sofia’s GUDP may not be effective in encouraging sustainable forms of growth. Substantial inconsistencies exist between the plan’s overall goals and some of its measures and implementation tools. The results on the ground suggest that, despite the plan’s low-density aspirations, Sofia is becoming more compact and densified, while losing its green edges and failing to redirect growth to its northern territories where ample space and opportunities exist. We conclude that employing the achievements of research on sustainability and developing relevant implementation tools such as more effective zoning regulations and viable suburban transportation infrastructure are necessary for realising both the patterns proposed through master planning and achieving sustainable urban growth.

  10. Voluntary research results for five years along the master plan on nuclear safety research. FY 2001 - 2005

    International Nuclear Information System (INIS)

    Sato, Yoshinori

    2006-05-01

    Safety Research has been conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005) in Japan Atomic Energy Agency which took over former Japan Nuclear Cycle Development Institute. This report shows the voluntary research results for five years conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005). (author)

  11. Research Plan to Determine Timing, Location, Magnitude and Cause of Mortality for Wild and Hatchery Spring/Summer Chinook Salmon Smolts Above Lower Granite Dam. Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lower Granite Migration Study Steering Committee

    1993-10-01

    From 1966 to 1968, Raymond estimated an average survival rate of 89% for yearling chinook salmon (Oncorhynchus tshawytscha) migrating from trap sites on the Salmon River to Ice Harbor Dam, which was then the uppermost dam on the Snake River. During the 1970s, the estimated survival rate declined as the proportion of hatchery fish increased and additional dams were constructed. Recent survival indices for yearling chinook salmon smolts in the Snake River Basin indicate that substantial mortalities are occurring en route to Lower Granite Dam, now the uppermost dam on the Snake River. Detection rates for wild and hatchery PIT-tagged smolts at Lower Granite Dam have been much lower than expected. However, for wild fish, there is considerable uncertainty whether overwinter mortality or smolt loss during migration is the primary cause for low survival. Efforts to rebuild these populations will have a better chance of success after the causes of mortality are identified and addressed. Information on the migrational characteristics and survival of wild fish are especially needed. The goal of this initial planning phase is to develop a research plan to outline potential investigations that will determine the timing, location, magnitude, and cause of smolt mortality above Lower Granite Dam.

  12. Structural master plan of flood mitigation measures

    Directory of Open Access Journals (Sweden)

    A. Heidari

    2009-01-01

    Full Text Available Flood protection is one of the practical methods in damage reduction. Although it not possible to be completely protected from flood disaster but major part of damages can be reduced by mitigation plans. In this paper, the optimum flood mitigation master plan is determined by economic evaluation in trading off between the construction costs and expected value of damage reduction as the benefits. Size of the certain mitigation alternative is also be obtained by risk analysis by accepting possibility of flood overtopping. Different flood mitigation alternatives are investigated from various aspects in the Dez and Karun river floodplain areas as a case study in south west of IRAN. The results show that detention dam and flood diversion are the best alternatives of flood mitigation methods as well as enforcing the flood control purpose of upstream multipurpose reservoirs. Dyke and levees are not mostly justifiable because of negative impact on down stream by enhancing routed flood peak discharge magnitude and flood damages as well.

  13. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1992 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Keefe, MaryLouise; Carmichael, Richard W.; French, Rod A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1993-03-01

    This report covers the first year of comprehensive monitoring and evaluation of the Umatilla Hatchery. As both the hatchery and the evaluation study are in the early stages of implementation, much of the information contained in this report is preliminary. The most crucial data for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available. A comprehensive fish health monitoring regimen was incorporated into the monitoring and evaluation study for Umatilla Hatchery. This is a unique feature of the Umatilla Hatchery evaluation project.

  14. Master Plan for Tennessee Schools: Preparing for the 21st Century.

    Science.gov (United States)

    Tennessee State Board of Education, Nashville.

    The Education Improvement Act (EIA) was passed in Tennessee in 1992. It established the Basic Education Program (BEP) as the funding formula used to provide adequate, equitable, and sustainable school funding. The 1997 master plan is consistent with the national Goals 2000 legislation and addresses each of the eight national goals. The plan…

  15. Improving the effectiveness of planning EIA (PEIA) in China: Integrating planning and assessment during the preparation of Shenzhen's Master Urban Plan

    International Nuclear Information System (INIS)

    Che Xiuzhen; English, Alex; Lu Jia; Chen, Yongqin David

    2011-01-01

    The enactment and implementation of the 2003 EIA Law in China institutionalised the role of plan environmental impact assessment (PEIA). While the philosophy, methodology and mechanisms of PEIA have gradually permeated through the various levels of government with a positive effect on the process and outcome of urban planning, only a few cities in China have so far carried out PEIA as a Strategic Environmental Assessment (SEA)-type procedure. One such case is the southern city of Shenzhen. During the past three decades, Shenzhen has grown from a small town to a large and booming city as China has successfully and rapidly developed its economy by adopting the 'reform and open door' policy. In response to the challenges arising from the generally divergent processes of rapid urbanisation, economic transformation and environment protection, Shenzhen has incrementally adopted the SEA concept in developing the city's Master Urban Plan. As such, this paper reviews the effectiveness of PEIA in three ways: ·as a tool and process for achieving more sustainable and strategic planning; ·to determine the level of integration of SEA within the planning system; and, ·its effectiveness vis-a-vis implementation. The implementation of PEIA within Shenzhen's Master Urban Plan offers important insights into the emergence of innovative practices in undertaking PEIA as well as theoretical contributions to the field, especially in exploring the relationship between PEIA and SEA and highlighting the central role of local governing institutions in SEA development.

  16. Path planning of master-slave manipulator using graphic simulator

    International Nuclear Information System (INIS)

    Lee, J. Y.; Kim, S. H.; Song, T. K.; Park, B. S.; Yoon, J. S.

    2002-01-01

    To handle the high level radioactive materials such as spent fuels remotely, the master-slave manipulator is generally used as a remote handling equipment in the hot cell. To analyze the motion and to implement the training system by virtual reality technology, the simulator for M-S manipulator using the computer graphics is developed. The parts are modelled in 3-D graphics, assembled, and kinematics are assigned. The inverse kinematics of the manipulator is defined, and the slave of manipulator is coupled with master by the manipulator's specification. Also, the virtual work cell is implemented in the graphical environment which is the same as the real environment and the path planning method using the function of the collision detection for a manipulator are proposed. This graphic simulator of manipulator can be effectively used in designing of the maintenance processes for the hot cell equipment and enhance the reliability of the spent fuel management

  17. Developing a Robust Strategy for Implementing a Water Resources Master Plan in Lima, Peru

    Science.gov (United States)

    Kalra, N.; Groves, D.; Bonzanigo, L.; Molina-Perez, E.

    2015-12-01

    Lima, the capital of Peru, faces significant water stress. It is the fifth largest metropolitan area in Latin America, and the second largest desert city in the world. The city has developed a Master Plan of major investment projects to improve water reliability until 2040. Yet key questions remain. Is the Master Plan sufficient for ensuring reliability in the face of deeply uncertain future climate change and demand? How do uncertain budget and project feasibility conditions shape Lima's options? How should the investments in the plan be prioritized, and can some be delayed? Lima is not alone in facing these planning challenges. Governments invest billions of dollars annually in long-term projects. Yet deep uncertainties pose formidable challenges to making near-term decisions that make long-term sense. The World Bank has spearheaded a community of practice on methods for Decision Making Under Deep Uncertainty (DMU). This pilot project in Peru is the first in-depth application of DMU techniques to water supply planning in a developing country. It builds on prior analysis done in New York, California, and for the Colorado River, yet shows how these methods can be applied in regions which do not have as advanced data or tools available. The project combines three methods in particular -- Robust Decision Making, Decision Scaling, and Adaptive Pathways -- to help Lima implement its Master Plan in a way that is robust, no-regret, and adaptive. It was done in close partnership with SEDAPAL, the water utility company in Lima, and in coordination with other national WRM and meteorological agencies. This talk will: Present the planning challenges Lima and other cities face, including climate change Describe DMU methodologies and how they were applied in collaboration with SEDAPAL Summarize recommendations for achieving long-term water reliability in Lima Suggest how these methodologies can benefit other investment projects in developing countries.

  18. Radiotherapy Facilities: Master Planning and Concept Design Considerations (Russian Edition)

    International Nuclear Information System (INIS)

    2015-01-01

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology and a typical project work plan, and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals

  19. Integral stormwater management master plan and design in an ecological community.

    Science.gov (United States)

    Che, Wu; Zhao, Yang; Yang, Zheng; Li, Junqi; Shi, Man

    2014-09-01

    Urban stormwater runoff nearly discharges directly into bodies of water through gray infrastructure in China, such as sewers, impermeable ditches, and pump stations. As urban flooding, water shortage, and other environment problems become serious, integrated water environment management is becoming increasingly complex and challenging. At more than 200ha, the Oriental Sun City community is a large retirement community located in the eastern side of Beijing. During the beginning of its construction, the project faced a series of serious water environment crises such as eutrophication, flood risk, water shortage, and high maintenance costs. To address these issues, an integral stormwater management master plan was developed based on the concept of low impact development (LID). A large number of LID and green stormwater infrastructure (GSI) approaches were designed and applied in the community to replace traditional stormwater drainage systems completely. These approaches mainly included bioretention (which captured nearly 85th percentile volume of the annual runoff in the site, nearly 5.4×10(5)m(3) annually), swales (which functioned as a substitute for traditional stormwater pipes), waterscapes, and stormwater wetlands. Finally, a stormwater system plan was proposed by integrating with the gray water system, landscape planning, an architectural master plan, and related consultations that supported the entire construction period. After more than 10 years of planning, designing, construction, and operation, Oriental Sun City has become one of the earliest modern large-scale LID communities in China. Moreover, the project not only addressed the crisis efficiently and effectively, but also yielded economic and ecological benefits. Copyright © 2014. Published by Elsevier B.V.

  20. Monitoring the hygene of chicken hatcheries in Taiwan during 1999-2001.

    Science.gov (United States)

    Chen, Su-Jen; Lee, Tsui-Er; Wang, Eve-Ming; Cho, Ta-Jen; Wang, Ching-Ho

    2002-12-01

    Microorganism contamination in hatcheries and eggs has a serious impact on the viability and quality of chicks as well as on the overall growth performance of chickens. Microbiological agents are present in the fluff when chicks hatch. Detecting microorganisms in fluff is a convenient method for evaluating the hygienic status in a hatchery. Fluff samples from 31 hatcheries collected over 3 years were tested for the total bacterial count, the presence of Salmonella spp., and fungus to evaluate the hygienic status of hatcheries in Taiwan from 1999 through 2001. The total bacterial score from the fluff samples was calculated and expressed as a bacterial score in a log scale. Most hatcheries had a bacterial count ranged from scale 1 to 3. Among the hatcheries, 13% to 29% were contaminated with Salmonella spp.; and 33% to 73% were contaminated with fungi in different quarters. The third quarter of each year was the most contaminated period (phatcheries keep their hygienic status and supply good quality chicks by cleaning and disinfecting.

  1. Stable isotope tracing of trout hatchery carbon to sediments and foodwebs of limestone spring creeks

    Energy Technology Data Exchange (ETDEWEB)

    Hurd, Todd M. [Department of Biology, Shippensburg University, 1871 Old Main Dr., Shippensburg, PA 17257 (United States)], E-mail: tmhurd@ship.edu; Jesic, Slaven; Jerin, Jessica L.; Fuller, Nathan W.; Miller, David [Department of Biology, Shippensburg University, 1871 Old Main Dr., Shippensburg, PA 17257 (United States)

    2008-11-01

    Limestone springs support productive ecosystems and fisheries, yet aquaculture may modify or impair these ecosystems. We determined trout hatchery organic contribution to spring creek sediments and foodwebs with natural abundance stable isotope methods. Hatchery feed, waste, and trout were significantly enriched in {delta}{sup 13}C relative to autotrophs and wild fish. Spring creek sediments were enriched in {delta}{sup 13}C toward the hatchery endmember relative to reference streams without hatcheries and relative to a larger larger-order, spring-influenced stream. Contribution of hatchery C to spring creek sediments was greatest during March and associated with greatest sediment %C. Contribution of hatchery C to pollution-tolerant isopod diet was 39-51% in a stream receiving limestone spring water via hatchery effluent. Isopods of one spring creek also relied on hatchery-derived C within one month of hatchery closure. Four years later, less pollution pollution-tolerant amphipods dominated and consumed non-vascular over vascular autotrophs (86%). Isopods of a second spring creek with an active hatchery did not appear to be using hatchery matter directly, but were enriched in {delta}{sup 34}S relative to a spring creek tributary with no hatchery influence. Isopods in both of these streams were relatively enriched in {delta}{sup 15}N, indicating general nutrient enrichment from surrounding agricultural land use. The contribution of hatchery vs. wild fish in diet of herons and egrets was traced with {delta}{sup 13}C of guano. These birds were strongly dependent on stocked trout in a spring creek with a recently closed state trout hatchery, and also near another large, state-run hatchery. Heron dependence on hatchery fish in the spring creek decreased with time since hatchery closure. Use of stable isotope natural abundance techniques in karst spring creeks can reveal stream impairment due to aquaculture, specific C sources to bio-indicating consumers, losses of

  2. Stable isotope tracing of trout hatchery carbon to sediments and foodwebs of limestone spring creeks

    International Nuclear Information System (INIS)

    Hurd, Todd M.; Jesic, Slaven; Jerin, Jessica L.; Fuller, Nathan W.; Miller, David

    2008-01-01

    Limestone springs support productive ecosystems and fisheries, yet aquaculture may modify or impair these ecosystems. We determined trout hatchery organic contribution to spring creek sediments and foodwebs with natural abundance stable isotope methods. Hatchery feed, waste, and trout were significantly enriched in δ 13 C relative to autotrophs and wild fish. Spring creek sediments were enriched in δ 13 C toward the hatchery endmember relative to reference streams without hatcheries and relative to a larger larger-order, spring-influenced stream. Contribution of hatchery C to spring creek sediments was greatest during March and associated with greatest sediment %C. Contribution of hatchery C to pollution-tolerant isopod diet was 39-51% in a stream receiving limestone spring water via hatchery effluent. Isopods of one spring creek also relied on hatchery-derived C within one month of hatchery closure. Four years later, less pollution pollution-tolerant amphipods dominated and consumed non-vascular over vascular autotrophs (86%). Isopods of a second spring creek with an active hatchery did not appear to be using hatchery matter directly, but were enriched in δ 34 S relative to a spring creek tributary with no hatchery influence. Isopods in both of these streams were relatively enriched in δ 15 N, indicating general nutrient enrichment from surrounding agricultural land use. The contribution of hatchery vs. wild fish in diet of herons and egrets was traced with δ 13 C of guano. These birds were strongly dependent on stocked trout in a spring creek with a recently closed state trout hatchery, and also near another large, state-run hatchery. Heron dependence on hatchery fish in the spring creek decreased with time since hatchery closure. Use of stable isotope natural abundance techniques in karst spring creeks can reveal stream impairment due to aquaculture, specific C sources to bio-indicating consumers, losses of farmed fish to predation, and potential exposure

  3. Connecting Systems Model Design to Decision-Maker and Stakeholder Needs: Lessons from Louisiana's Coastal Master Plan

    Science.gov (United States)

    Fischbach, J. R.; Johnson, D.

    2017-12-01

    Louisiana's Comprehensive Master Plan for a Sustainable Coast is a 50-year plan designed to reduce flood risk and minimize land loss while allowing for the continued provision of economic and ecosystem services from this critical coastal region. Conceived in 2007 in response to hurricanes Katrina and Rita in 2005, the master plan is updated on a five-year planning cycle by the state's Coastal Protection and Restoration Authority (CPRA). Under the plan's middle-of-the-road (Medium) environmental scenario, the master plan is projected to reduce expected annual damage from storm surge flooding by approximately 65% relative to a future without action: from 5.3 billion to 2.2 billion in 2040, and from 12.1 billion to 3.7 billion in 2065. The Coastal Louisiana Risk Assessment model (CLARA) is used to estimate the risk reduction impacts of projects that have been considered for implementation as part of the plan. Evaluation of projects involves estimation of cost effectiveness in multiple future time periods and under a range of environmental uncertainties (e.g., the rates of sea level rise and land subsidence, changes in future hurricane intensity and frequency), operational uncertainties (e.g., system fragility), and economic uncertainties (e.g., patterns of population change and asset exposure). Between the 2012 and 2017 planning cycles, many improvements were made to the CLARA model. These included changes to the model's spatial resolution and definition of policy-relevant spatial units, an improved treatment of parametric uncertainty and uncertainty propagation between model components, the addition of a module to consider critical infrastructure exposure, and a new population growth model. CPRA also developed new scenarios for analysis in 2017 that were responsive to new scientific literature and to accommodate a new approach to modeling coastal morphology. In this talk, we discuss how CLARA has evolved over the 2012 and 2017 planning cycles in response to the needs

  4. 29 CFR 780.210 - The typical hatchery operations constitute “agriculture.”

    Science.gov (United States)

    2010-07-01

    ... EXEMPTIONS APPLICABLE TO AGRICULTURE, PROCESSING OF AGRICULTURAL COMMODITIES, AND RELATED SUBJECTS UNDER THE FAIR LABOR STANDARDS ACT Agriculture as It Relates to Specific Situations Hatchery Operations § 780.210 The typical hatchery operations constitute “agriculture.” As stated in § 780.127, the typical hatchery...

  5. Sherman Creek Hatchery; 1995-1996 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Combs, Mitch [Washington Dept. of Fish and Wildlife, Olympia, WA (United States). Hatcheries Program

    1997-01-01

    The Sherman Creek Hatchery (SCH) was designed to rear 1.7 million kokanee fry for acclimation and imprinting during the spring and early summer. Additionally, it was designed to trap all available returning adult kokanee during the fall for broodstock operations and evaluations. Since the start of this program, the operations of the SCH have been modified to better achieve program goals. These strategic changes have been the result of recommendations through the Lake Roosevelt Hatcheries Coordination Team (LRHCT) and were implemented to enhance imprinting, improve survival and operate the two kokanee facilities more effectively. The primary change has been to replace the kokanee fingerling program with a kokanee yearling (post smolt) program. The second significant change has been to rear 120,000 rainbow trout fingerling at SCH from July through October to enable the Spokane Tribal Hatchery (STH) to rear additional kokanee for the yearling program.

  6. Master Plan for Tennessee Schools, 1995: Preparing for the 21st Century.

    Science.gov (United States)

    Tennessee State Board of Education, Nashville.

    The Tennessee State Legislature passed the Education Improvement Act (EIA) in 1992, which established the Basic Education Program (BEP) as the funding formula for providing adequate, equitable, and sustainable school funding. This document presents the 1995 Master Plan for Tennessee Schools, which focuses on the priority issues that must be…

  7. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  8. Assessing the prevalence of Salmonella enterica in poultry hatcheries by using hatched eggshell membranes.

    Science.gov (United States)

    Chao, M-R; Hsien, C-H; Yeh, C-M; Chou, S-J; Chu, C; Su, Y-C; Yu, C-Y

    2007-08-01

    Salmonella enterica causes a number of significant poultry diseases and is also a major pathogen in humans. Most poultry infected by Salmonella become carriers; infection may also be fatal, depending on the particular serovar and the age of the bird at infection. Younger birds are more susceptible to infection by Salmonella, so it is critical that hatcheries monitor birds. We developed a method to use hatched eggshell membranes (HEM) to assess contamination by Salmonella in poultry hatching cabinets and to evaluate the prevalence of Salmonella in a goose hatchery and rearing farm. Comparison of the Salmonella isolation rate in hatching cabinets using 3 sampling methods showed that the highest Salmonella contamination was detected in HEM, and that these results differed significantly from those obtained from fluff samples and cabinet swab samples (P chicken, and duck hatcheries. The lowest Salmonella-positive rate was found for the chicken hatchery, followed by the goose and the duck hatcheries (P hatcheries: A, B, C1, C2, D, and E. The distribution of these serogroups differed among the hatcheries. Salmonella serogroup C1 was the major serogroup found in geese, compared with serogroup B in chickens and ducks. However, Salmonella Typhimurium was dominant in 1 goose hatchery and also in geese from this hatchery that had been transferred to a farm. Antibiotic susceptibility analysis showed that Salmonella Typhimurium strains isolated from the farm geese with diarrhea showed significantly higher resistance to doxycycline, colistin, sulfamethoxazole-trimethoprin, and cephalothin than those isolated from the hatchery (P hatcheries and rearing farms.

  9. Physiological Assessment of Wild and Hatchery Juvenile Salmonids : Final Report, 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Donald A.; Beckman, Brian R.; Dickhoff, Walton W.

    2003-08-01

    It is generally held that hatchery-reared salmonids are of inferior quality and have lower smolt-to-adult survival compared to naturally-reared salmon. The overall objectives of the work performed under this contract were the following: (1) Characterize the physiology and development of naturally rearing juvenile salmonids to: (2) Allow for the design of effective rearing programs for producing wild-like smolts in supplementation and production hatchery programs. (3) Examine the relationship between growth rate and size on the physiology and migratory performance of fish reared in hatchery programs. (4) Examine the interaction of rearing temperature and feed rate on the growth and smoltification of salmon for use in producing a more wild-like smolt in hatchery programs.

  10. Sherman Creek Hatchery, annual report 2000

    International Nuclear Information System (INIS)

    2001-01-01

    The Sherman Creek Hatchery (SCH) was designed to rear 1.7 million kokanee fry for acclimation and imprinting during the spring and early summer. Additionally, it was designed to trap all available returning adult kokanee during the fall for broodstock operations and evaluations. Since the start of this program, the operations on Lake Roosevelt have been modified to better achieve program goals. These strategic changes have been the result of recommendations through the Lake Roosevelt Hatcheries Coordination Team (LRHCT) and were done to enhance imprinting, improve survival and operate the two kokanee facilities more effectively. The primary changes have been to replace the kokanee fingerling program with a yearling (post smolt) program of up to 1,000,000 fish. To construct and operate twenty net pens to handle the increased production. The second significant change was to rear 200,000 rainbow trout fingerling at SCH from July through October, for stocking into the volunteer net pens. This enables the Spokane Tribal Hatchery (STH) to rear additional kokanee to further the enhancement efforts on Lake Roosevelt. Monitoring and evaluation is preformed by the Lake Roosevelt Fisheries Monitoring Program. From 1988 to 1998, the principle sport fishery on Lake Roosevelt has shifted from walleye to include rainbow trout and kokanee salmon (Underwood et al. 1997, Tilson and Scholz 1997). The angler use, harvest rates for rainbow and kokanee and the economic value of the fishery has increased substantially during this 10-year period. The most recent information from the monitoring program also suggests that the hatchery and net pen rearing programs have been beneficial to enhancing the Lake Roosevelt fishery while not negatively impacting wild and native stocks within the lake

  11. The Dutch Bicycle Master Plan and road safety : measures to be taken.

    NARCIS (Netherlands)

    Noordzij, P.C. & Blokpoel, A.

    1998-01-01

    The Bicycle Master Plan was launched in 1990 and concluded in 1996. To mark its conclusion, a study was carried out to assess developments in road safety for cyclists. An overview of future measures was also compiled. Since 1950, there have been three broad periods: (1) 1950-1975: an increase in the

  12. Observations on the distribution and control of Salmonella in commercial duck hatcheries in the UK.

    Science.gov (United States)

    Martelli, F; Birch, C; Davies, R H

    2016-01-01

    Salmonella infection causes a significant number of cases of gastroenteritis and more serious illnesses in people in the UK and EU. The serovars Salmonella Enteritidis and Salmonella Typhimurium are most frequently associated with foodborne illness in Europe. Whilst control programmes exist to monitor these serovars in the chicken and turkey sectors, no regulatory programme is currently in place for the duck sector. A voluntary industry scheme (Duck Assurance Scheme) was launched in the UK in 2010. Hatcheries act as focal points of Salmonella contamination, in particular if Salmonella-contaminated eggs from positive breeding farms enter the hatchery. Five duck hatcheries were visited in this study and four were positive for Salmonella. S. Typhimurium DT8 and S. Indiana were isolated from hatchery 1 and S. Typhimurium DT41 and S. Senftenberg were isolated from hatchery 3. S. Kottbus, S. Bovismorbificans and S. Senftenberg were isolated from hatchery 2 and S. Kedougou was isolated from hatchery 4. Advice on the control/elimination of Salmonella was provided at each visit and a longitudinal study was undertaken to monitor its effectiveness. Extensive sampling was carried out in the hatcheries visited and the tray wash area and waste/external areas had the highest probability of being contaminated. The hatcher area was also found to be a primary focus of contamination. Improvements of farm and hatchery biosecurity standards have resulted in a reduction of hatchery contamination in this study and in previous investigations. Hatcheries 1 and 5 were cleared of Salmonella, demonstrating that elimination of Salmonella contamination from duck hatcheries is achievable.

  13. Master environmental plan for Fort Devens, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. (Argonne National Lab., IL (United States). Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  14. On the Frontline: Tracking Ocean Acidification in an Alaskan Shellfish Hatchery

    Science.gov (United States)

    Evans, Wiley; Mathis, Jeremy T.; Ramsay, Jacqueline; Hetrick, Jeff

    2015-01-01

    The invasion of anthropogenic carbon dioxide (CO2) into the ocean is shifting the marine carbonate system such that saturation states of calcium carbonate (CaCO3) minerals are decreasing, and this is having a detrimental impact on early life stages of select shellfish species. The global, secular decrease in CaCO3 saturation states is occurring on top of a backdrop of large natural variability in coastal settings; progressively shifting the envelope of variability and leading to longer and more frequent exposure to adverse conditions. This is a great concern in the State of Alaska, a high-latitude setting vulnerable to rapid changes in the marine carbonate system, where an emerging shellfish industry plans major growth over the coming decades. Currently, the Alutiiq Pride Shellfish Hatchery (APSH) in Seward, Alaska is the only hatchery in the state, and produces many shellfish species with early life stages known to be sensitive to low CaCO3 saturation states. Here we present the first land-based OA measurements made in an Alaskan shellfish hatchery, and detail the trends in the saturation state of aragonite (Ωarag), the more soluble form of CaCO3, over a 10-month period in the APSH seawater supply. These data indicate the largest changes are on the seasonal time scale, with extended periods of sub-optimal Ωarag levels (Ωarag < 1.5) in winter and autumn associated with elevated water column respiration and short-lived runoff events, respectively. The data pinpoint a 5-month window of reprieve with favorable Ωarag conditions above the sub-optimal Ωarag threshold, which under predicted upper-bound CO2 emissions trajectories is estimated to close by 2040. To date, many species in production at APSH remain untested in their response to OA, and the data presented here establish the current conditions at APSH as well as provide a framework for hatchery-based measurements in Alaska. The current and expected conditions seen at APSH are essential to consider for this

  15. The Addition of Hatchery Liquid Waste to Dairy Manure Improves Anaerobic Digestion

    Directory of Open Access Journals (Sweden)

    WRT Lopes

    Full Text Available ABSTRACT The objective of this study was to determine the optimal inclusion level of liquid egg hatchery waste for the anaerobic co-digestion of dairy cattle manure. A completely randomized experimental was applied, with seven treatments (liquid hatchery waste to cattle manure ratios of0: 100, 5:95, 10:90, 15:85, 20:80, 25:75 and 30:70, with five replicates (batch digester model each. The evaluated variables were disappearance of total solids (TS, volatile solids (VS, and neutral detergent fiber (NDF, and specific production of biogas and of methane. Maximum TS and VS disappearance of 41.3% and 49.6%, were obtained at 15.5% and 16.0% liquid hatchery waste inclusion levels. The addition of 22.3% liquid hatchery considerably reduced NDF substrate content (53.2%. Maximum specific biogas production was obtained with 17% liquid hatchery waste, with the addition of 181.7 and 229.5 L kg-1TS and VS, respectively. The highest methane production, at 120.1 and 151.8 L CH4 kg-1TS and VS, was obtained with the inclusion of 17.5 and 18.0% liquid hatchery waste, respectively. The addition of liquid hatchery waste atratios of up to 15.5%in co-digestion with cattle manure reduced solid and fiber levels in the effluent, and improved biogas and methane production.

  16. Water chemistry - Investigation of Methods to Improve Homing by Hatchery Salmon

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Investigate olfactory imprinting techniques that will improve homing by hatchery salmon to their hatchery of origin, and thereby reduce potential risks from these...

  17. Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing

    OpenAIRE

    Kimms, Alf

    1996-01-01

    This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.

  18. Master plan study - District heating Sillamaee municipality. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to the final report on the master plan study on district heating in the municipality in Estonia, chapter nine, gives data related to general economic assumptions for financial and economic calculations, fuel consumption, financing, prices, fuel consumption. (ARW)

  19. Occurrence, size, and tag retention of sneaker male hatchery rainbow trout

    Science.gov (United States)

    Isely, J.J.; Grabowski, T.B.

    2004-01-01

    One alternative reproductive tactic involving early-maturing, cryptic males is referred to as "sneaking." Although sneakers tend to be easily detectable upon close inspection, little is known about the proportion of a fish population consisting of sneakers. We examined 15,400 age-1 rainbow trout Oncorhynchus mykiss in a hatchery. Total length (mm), wet weight (g), and sex (sneaker male or unknown) were recorded for each fish. We also individually tagged each sneaker male with soft visual implant alphanumeric (VIalpha) tags that were sequentially numbered and held the fish for 25 d before inspection. Sneakers constituted 2.8% of the hatchery rainbow trout population and were smaller in total length and weight than typical rainbow trout of the same age. Retention of the VIalpha tags in sneakers was 58.9%, significantly lower than has been reported under similar circumstances. We found that sneaker males may contribute substantially to hatchery populations. Reduced tag retention in sneakers may bias studies evaluating the effect of hatchery fish on wild populations. We believe that hatchery-produced sneaker males have the potential to contribute importantly to the genetic composition of wild populations.

  20. Morphometric comparison between hatchery-reared and wild-caught megalopae of the mangrove crab

    Directory of Open Access Journals (Sweden)

    Bárbara Andressa Casagrande Ayres

    2013-08-01

    Full Text Available The objective of this work was to compare the morphometry of hatchery-reared and wild-caught mangrove crab (Ucides cordatus megalopae. Ten U. cordatus megalopae of each group (hatchery-reared and wild-caught were individually analyzed using a stereoscopic microscope equipped with an ocular micrometer. Length, width, and height of all megalopae were measured, and the size of body appendices was determined. The results indicate that the hatchery-reared megalopae are more robust than the wild ones. Furthermore, some significant differences in the size of certain appendices can be cues of the kind of alterations that hatchery-reared individuals experience.

  1. Development of a master plan for industrial solid waste management

    International Nuclear Information System (INIS)

    Karamouz, M.; Zahraie, B.; Kerachian, R.; Mahjouri, N.; Moridi, A.

    2006-01-01

    Rapid industrial growth in the province of Khuzestan in the south west of Iran has resulted in disposal of about 1750 tons of solid waste per day. Most of these industrial solid wastes including hazardous wastes are disposed without considering environmental issues. This has contributed considerably to the pollution of the environment. This paper introduces a framework in which to develop a master plan for industrial solid waste management. There are usually different criteria for evaluating the existing solid waste pollution loads and how effective the management schemes are. A multiple criteria decision making technique, namely Analytical Hierarchy Process, is used for ranking the industrial units based on their share in solid waste related environmental pollution and determining the share of each unit in total solid waste pollution load. In this framework, a comprehensive set of direct, indirect, and supporting projects are proposed for solid waste pollution control. The proposed framework is applied for industrial solid waste management in the province of Khuzestan in Iran and a databank including GIS based maps of the study area is also developed. The results have shown that the industries located near the capital city of the province, Ahwaz, produce more than 32 percent of the total solid waste pollution load of the province. Application of the methodology also has shown that it can be effectively used for development of the master plan and management of industrial solid wastes

  2. A Master Plan for the Development of Vocational-Technical Education In New Mexico.

    Science.gov (United States)

    Sterling Inst., Washington, DC.

    This master plan for vocational education in New Mexico is the result of a study conducted by professional education consultants. The following areas were examined during the study: (1) New Mexico's present manpower problems, (2) market trends of future industrial potential, (3) state resources capable of attracting new industry, (4) adequacy of…

  3. Implementation of the Master Plan Activities in Serayu River Voyage (SRV Within the Framework of Tourism Development in Banyumas Regency

    Directory of Open Access Journals (Sweden)

    Imam Pamungkas

    2015-02-01

    Full Text Available The Master Plan Activity of Serayu River Voyage (SRV for tourism development in Banyumas Regency were expected to be completed within five years from 2008 to 2012, but during the period until 2013, most programs and activities have not been implemented. The results showed that the Master Plan of SRV in the framework of tourism development in Banyumas Regency has not been implemented properly. The cause is the absence of good coordination between agencies, the lack programs and activities integration, supporting documents have not been revised, absence of good socialization, and the lack of private sector contribution. The factors that constrain and support implementation of the Master Plan is described as follows. Supporting factors: competent human resources (implementor already available at the managerial level and have intellectual tourism, it is only need to add personnel in the sector of culture; the availability of adequate budget; institutions that have been effective and efficient; High community response; High commitment of Banyumas Regent and cooperation related parties (stakeholders; and natural conditions of Serayu tend to calm and the river slope condition is small. The constrain factors: regulatory policies; integration of programs and activities; coordination and socialization implied sectoral ego that need to be addressed. Keywords : implementation, master plan, Serayu River Voyage, human resources, regulation

  4. An evaluation of the effects of conservation and fishery enhancement hatcheries on wild populations of salmon

    Science.gov (United States)

    Naish, Kerry A.; Taylor, Joseph E.; Levin, Phillip S.; Quinn, Thomas P.; Winton, James R.; Huppert , Daniel; Hilborn , Ray

    2007-01-01

    The historical, political and scientific aspects of salmon hatchery programmes designed to enhance fishery production, or to recover endangered populations, are reviewed. We start by pointing out that the establishment of hatcheries has been a political response to societal demands for harvest and conservation; given this social context, we then critically examined the levels of activity, the biological risks, and the economic analysis associated with salmon hatchery programmes. A rigorous analysis of the impacts of hatchery programmes was hindered by the lack of standardized data on release sizes and survival rates at all ecological scales, and since hatchery programme objectives are rarely defined, it was also difficult to measure their effectiveness at meeting release objectives. Debates on the genetic effects of hatchery programmes on wild fish have been dominated by whether correct management practices can reduce negative outcomes, but we noted that there has been an absence of programmatic research approaches addressing this important issue. Competitive interactions between hatchery and wild fish were observed to be complex, but studies researching approaches to reduce these interactions at all ecological scales during the entire salmon life history have been rare, and thus are not typically considered in hatchery management. Harvesting of salmon released from fishery enhancement hatcheries likely impacts vulnerable wild populations; managers have responded to this problem by mass marking hatchery fish, so that fishing effort can be directed towards hatchery populations. However, we noted that the effectiveness of this approach is dependant on accurate marking and production of hatchery fish with high survival rates, and it is not yet clear whether selective fishing will prevent overharvest of wild populations. Finally, research demonstrating disease transmission from hatchery fish to wild populations was observed to be equivocal; evidence in this area has

  5. Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Baker, Dan J.; Heindel, Jeff A.; Redding, Jeremy (Idaho Department of Fish and Game, Boise, ID)

    2006-05-01

    On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Oceanic and Atmospheric Administration at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Oceanic and Atmospheric Administration are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases (annual report to the Bonneville Power Administration for the research element of the program) are also reported separately. Captive broodstock program activities conducted between January 1, 2004 and December 31, 2004 for the hatchery element of the program are presented in this report. In 2004, twenty-seven anadromous sockeye salmon returned to the Sawtooth Valley. Traps on Redfish Lake Creek and the upper Salmon River at the Sawtooth Fish Hatchery intercepted one and four adults, respectively. Additionally, one adult sockeye salmon was collected at the East Fork Salmon River weir, 18 were seined from below the Sawtooth Fish Hatchery weir, one adult sockeye salmon was observed below the Sawtooth Fish Hatchery weir but not captured, and two adult sockeye salmon were observed in Little Redfish Lake but not captured. Fish were captured/collected between July 24 and September 14, 2004. The captured/collected adult sockeye salmon (12 females and 12 males) originated from a variety of release strategies and were transferred to

  6. Reduced reproductive success of hatchery coho salmon in the wild: insights into most likely mechanisms.

    Science.gov (United States)

    Thériault, Véronique; Moyer, Gregory R; Jackson, Laura S; Blouin, Michael S; Banks, Michael A

    2011-05-01

    Supplementation of wild salmonids with captive-bred fish is a common practice for both commercial and conservation purposes. However, evidence for lower fitness of captive-reared fish relative to wild fish has accumulated in recent years, diminishing the apparent effectiveness of supplementation as a management tool. To date, the mechanism(s) responsible for these fitness declines remain unknown. In this study, we showed with molecular parentage analysis that hatchery coho salmon (Oncorhynchus kisutch) had lower reproductive success than wild fish once they reproduced in the wild. This effect was more pronounced in males than in same-aged females. Hatchery spawned fish that were released as unfed fry (age 0), as well as hatchery fish raised for one year in the hatchery (released as smolts, age 1), both experienced lower lifetime reproductive success (RS) than wild fish. However, the subset of hatchery males that returned as 2-year olds (jacks) did not exhibit the same fitness decrease as males that returned as 3-year olds. Thus, we report three lines of evidence pointing to the absence of sexual selection in the hatchery as a contributing mechanism for fitness declines of hatchery fish in the wild: (i) hatchery fish released as unfed fry that survived to adulthood still had low RS relative to wild fish, (ii) age-3 male hatchery fish consistently showed a lower relative RS than female hatchery fish (suggesting a role for sexual selection), and (iii) age-2 jacks, which use a sneaker mating strategy, did not show the same declines as 3-year olds, which compete differently for females (again, implicating sexual selection). © 2011 Blackwell Publishing Ltd.

  7. A Case Study in Master Planning the Learning Landscape Hub Concepts for the University at Buffalo

    Science.gov (United States)

    Dugdale, Shirley; Torino, Roger; Felix, Elliot

    2009-01-01

    This case study describes concepts for three types of learning spaces that grew out of a Learning Landscape planning process. The process was part of a master plan study for the three campuses of the University at Buffalo. It involved research into user needs and aspirations about future pedagogy, development of learning space strategy,…

  8. Coeur d'Alene Tribal Production Facility, Volume I of III, 2002-2003 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Anders, Paul

    2003-01-01

    In fulfillment of the NWPPC's 3-Step Process for the implementation of new hatcheries in the Columbia Basin, this Step 1 submission package to the Council includes four items: (1) Cover letter from the Coeur d'Alene Tribe, Interdisciplinary Team Chair, and the USFWS; (2) References to key information (Attachments 1-4); (3) The updated Master Plan for the Tribe's native cutthroat restoration project; and (4) Appendices. In support of the Master Plan submitted by the Coeur d'Alene Tribe the reference chart (Item 2) was developed to allow reviewers to quickly access information necessary for accurate peer review. The Northwest Power Planning Council identified pertinent issues to be addressed in the master planning process for new artificial production facilities. References to this key information are provided in three attachments: (1) NWPPC Program language regarding the Master Planning Process, (2) Questions Identified in the September 1997 Council Policy, and (3) Program language identified by the Council's Independent Scientific Review Panel (ISRP). To meet the need for off-site mitigation for fish losses on the mainstem Columbia River, in a manner consistent with the objectives of the Council's Program, the Coeur d'Alene Tribe is proposing that the BPA fund the design, construction, operation, and maintenance of a trout production facility located adjacent to Coeur d'Alene Lake on the Coeur d'Alene Indian Reservation. The updated Master Plan (Item 3) represents the needs associated with the re-evaluation of the Coeur d'Alene Tribe's Trout Production Facility (No.199004402). This plan addresses issues and concerns expressed by the NWPPC as part of the issue summary for the Mountain Columbia provincial review, and the 3-step hatchery review process. Finally, item 4 (Appendices) documents the 3-Step process correspondence to date between the Coeur d'Alene Tribe and additional relevant entities. Item 4

  9. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1993-1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, Michael C.; Onjukka, Sam T.; Focher, Shannon M. (Oregon Department of Fish and Wildlife, Portland, OR)

    1995-01-01

    This report covers the first three years of comprehensive monitoring and evaluation of the Umatilla Hatchery. Because the hatchery and the evaluation study and the fish health monitoring investigations are in the early stages of implementation, much of the information contained in this report is preliminary. The majority of the data that is crucial for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available.

  10. Protein profiles of hatchery egg shell membrane.

    Science.gov (United States)

    Rath, N C; Liyanage, R; Makkar, S K; Lay, J O

    2016-01-01

    Eggshells which consist largely of calcareous outer shell and shell membranes, constitute a significant part of poultry hatchery waste. The shell membranes (ESM) not only contain proteins that originate from egg whites but also from the developing embryos and different contaminants of microbial and environmental origins. As feed supplements, during post hatch growth, the hatchery egg shell membranes (HESM) have shown potential for imparting resistance of chickens to endotoxin stress and exert positive health effects. Considering that these effects are mediated by the bioactive proteins and peptides present in the membrane, the objective of the study was to identify the protein profiles of hatchery eggshell membranes (HESM). Hatchery egg shell membranes were extracted with acidified methanol and a guanidine hydrochloride buffer then subjected to reduction/alkylation, and trypsin digestion. The methanol extract was additionally analyzed by matrix assisted laser desorption ionization-time of flight mass spectrometry (MALDI-TOF-MS). The tryptic digests were analyzed by liquid chromatography and tandem mass spectrometry (LC-MS-MS) to identify the proteins. Our results showed the presence of several proteins that are inherent and abundant in egg white such as, ovalbumin, ovotransferrin, ovocleidin-116, and lysozyme, and several proteins associated with cytoskeletal, cell signaling, antimicrobial, and catalytic functions involving carbohydrate, nucleic acid, and protein metabolisms. There were some blood derived proteins most likely originating from the embryos and several other proteins identified with different aerobic, anaerobic, gram positive, gram negative, soil, and marine bacterial species some commensals and others zoonotic. The variety of bioactive proteins, particularly the cell signaling and enzymatic proteins along with the diverse microbial proteins, make the HESM suitable for nutritional and biological application to improve post hatch immunity of poultry.

  11. Genetic diversity of wild and hatchery lake trout populations: Relevance for management and restoration in the Great Lakes

    Science.gov (United States)

    Page, K.S.; Scribner, K.T.; Burnham-Curtis, M.

    2004-01-01

    The biological diversity of lake trout Salvelinus namaycush in the upper Great Lakes was historically high, consisting of many recognizable morphological types and discrete spawning populations. During the 1950s and 1960s, lake trout populations were extirpated from much of the Great Lakes primarily as a result of overfishing and predation by the parasitic sea lamprey Petromyzon marinus. Investigations of how genetic diversity is partitioned among remnant wild lake trout populations and hatchery broodstocks have been advocated to guide lake trout management and conservation planning. Using microsatellite genetic markers, we estimated measures of genetic diversity and the apportionment of genetic variance among 6 hatchery broodstocks and 10 wild populations representing three morphotypes (lean, humper, and siscowet). Analyses revealed that different hatchery broodstocks and wild populations contributed disproportionally to the total levels of genetic diversity. The genetic affinities of hatchery lake trout reflected the lake basins of origin of the wild source populations. The variance in allele frequency over all sampled extant wild populations was apportioned primarily on the basis of morphotype (??MT = 0.029) and secondarily among geographically dispersed populations within each morphotype (??ST = 0.024). The findings suggest that the genetic divergence reflected in recognized morphotypes and the associated ecological and physiological specialization occurred prior to the partitioning of large proglacial lakes into the Great Lakes or as a consequence of higher contemporary levels of gene flow within than among morphotypes. Information on the relative contributions of different broodstocks to total gene diversity within the regional hatchery program can be used to prioritize the broodstocks to be retained and to guide future stocking strategies. The findings highlight the importance of ecological and phenotypic diversity in Great Lakes fish communities and

  12. Successful large-scale hatchery culture of sandfish (Holothuria scabra using micro-algae concentrates as a larval food source

    Directory of Open Access Journals (Sweden)

    Thane A. Militz

    2018-02-01

    Full Text Available This paper reports methodology for large-scale hatchery culture of sandfish, Holothuria scabra, in the absence of live, cultured micro-algae. We demonstrate how commercially-available micro-algae concentrates can be incorporated into hatchery protocols as the sole larval food source to completely replace live, cultured micro-algae. Micro-algae concentrates supported comparable hatchery production of sandfish to that of live, cultured micro-algae traditionally used in large-scale hatchery culture. The hatchery protocol presented allowed a single technician to achieve production of more than 18,800 juvenile sandfish at 40 days post-fertilisation in a low-resource hatchery in Papua New Guinea. Growth of auricularia larvae fed micro-algae concentrates was represented by the equation length (μm = 307.8 × ln(day + 209.2 (R2 = 0.93 while survival over the entire 40 day hatchery cycle was described by the equation survival = 2 × day−1.06 (R2 = 0.74. These results show that micro-algae concentrates have great potential for simplifying hatchery culture of sea cucumbers by reducing infrastructural and technical resources required for live micro-algae culture. The hatchery methodology described in this study is likely to have applicability to low-resource hatcheries throughout the Indo-Pacific and could support regional expansion of sandfish hatchery production.

  13. Master Environmental Plan: Fort Wingate Depot Activity, Gallup, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Yuen, C.R.; Biang, R.P.; Antonopoulos, A.A.; Ditmars, J.D.

    1990-12-01

    The master environmental plan is based on an environmental assessment of the areas requiring environmental evaluation (AREEs) at Fort Wingate Depot Activity near Gallup, New Mexico. The Fort Wingate Depot Activity is slated for closure under the Base Closure and Realignment Act, Public Law 100--526. The MEP assesses the current status, describes additional data requirements, recommends actions for the sites, and establishes a priority order for actions. The plan was developed so that actions comply with hazardous waste and water quality regulations of the State of New Mexico and applicable federal regulations. It contains a brief history of the site, relevant geological and hydrological information, and a description of the current status for each AREE along with a discussion of the available site-specific data that pertain to existing or potential contamination and the impact on the environment. 35 refs., 27 figs., 23 tabs.

  14. Effect of oxygen supplementation in a hatchery at high altitude and ...

    African Journals Online (AJOL)

    The objective of this study was to investigate the effect of oxygen supplementation on broiler eggs in a hatchery at high altitude on the growth performance and ascites syndrome of broilers reared at low altitude. The treatment groups were low altitude with no oxygen supplemented in the hatchery (LA-NOX); high altitude with ...

  15. Umatilla Hatchery Monitoring and Evaluation, 1999-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Chess, Dale W.; Cameron, William A.; Stonecypher, Jr., R. Wes (Oregon Department of Fish and Wildlife, Salem, OR)

    2003-12-01

    REPORT A: UMATILLA HATCHERY MONITORING AND EVALUATION--This report summarizes monitoring and evaluation studies of salmonids reared at Umatilla Fish Hatchery (UFH) for 1 November, 1999 to 31 October, 2002. Studies at UFH are designed to evaluate rearing of chinook salmon and steelhead in ''Michigan raceways''. Characteristics of Michigan raceways include high fish densities, rapid water turnover, oxygen supplementation, reuse of water, and baffles designed to reduce cleaning. Fish health at UFH and other facilities associated with the Umatilla program are intensively monitored and evaluated along with the overall research project. Further, under the Integrated Hatchery Operations Team guidelines, specific requirements for fish health monitoring at UFH are mandatory. An experiment designed to evaluate rearing subyearling fall chinook salmon in Michigan and Oregon raceways has been completed. An evaluation of survival of subyearling fall chinook salmon reared at three densities will be completed with final returns in 2005. Two new evaluations were started during this reporting period. The first is an evaluation of spring chinook survival of groups transferred to Imeques acclimation facility in the fall, overwinter-acclimated and released with the standard acclimated production groups in March. The second is an evaluation of subyearling fall chinook survival and straying of a direct-stream released group in the lower Umatilla River and the standard group acclimated at Thornhollow acclimation facility in the upper Umatilla River. An important aspect of the project is evaluation of the spring chinook and summer steelhead fisheries in the upper and lower Umatilla River. REPORT B: Fish Health Monitoring and Evaluation, 2000 Fiscal Year--The results presented in this report are from the ninth year of Fish Health Monitoring and Evaluation in the Umatilla Hatchery program. Broodstock monitoring for hatchery production was conducted on adult returns to the

  16. Istra district heating system. Specific technical report. Appendix 2 to the master plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    The objective of the master plan project is to improve heat supply in Istra. The considerable system losses from the fuel supplied to the end-users are one subject for improvement. At the same time, the current system operation results in poor quality heat for the consumers. Due to the inflexibility of the system, the dwellings/premises of the consumers are either overheated or insufficiently heated. The financial situation in Istra, the legal ownership of the district heating system and consumers ability to pay limit the possibilities for system improvements. The Master Plan and Feasibility Study evaluates four different development scenarios. Each of the scenarios is compared to the current situation in Istra, where nothing is done to change the system, but only to operate the present system in a sustainable way. The sustainable operation of the district heating system includes all necessary renovations and component replacements necessary. The project does not take into account the present financial situation in Istra, which has resulted in less maintenance than necessary. This situation is not a comparable parameter, as it is not sustainable and will lead to a breakdown of the heat supply within a short time horizon. (EHS)

  17. Guidance documents: Continued support to improve operations of fish hatcheries and field sites to reduce the impact or prevent establishment of New Zealand Mudsnails and other invasive mollusks

    Science.gov (United States)

    Moffitt, Christine M.

    2017-01-01

    Western New Zealand Mudsnail Conference in Seattle. Targeted hatchery workshops were conducted with staff at Dworshak National Fish Hatchery Complex (ID), Similkameen Pond, Oroville WA, and Ringold Springs State Hatchery (WA).As a result of communications with hatchery staff, invasive species managers, and on site assessments of hatchery facilities, the document was modified and enhanced. Additional resources were added to keep it up to date. The result is a more simplified tool that can lead hatchery or management personnel through the process of risk assessment and provide an introduction to the risk management and communication process.In addition to the typical HACCP processes, this tool adds steps to rate and consider uncertainty and the weight of evidence regarding options and monitoring results . Uncertainty of outcome exists in most tools that can be used to control or prevent NZMS or other invasive mollusks from infesting an area. In additional this document emphasizes that specific control tools and plans must be tailored to each specific setting to consider the economic, environmental and social influences. From the testing and evaluation process, there was a strong recognition that a number of control and prevention tools previously suggested and reported in the literature from laboratory and small scale trials may not be compatible with regional and national regulations, economic constraints, social or cultural constraints, engineering or water chemistry characteristics of each facility.The options for control are summarized in the second document, Review of Control Measures for Hatcheries Infested with NZMS (Appendix A) that provides sources for additional resources and specific tools, and guidance regarding the feasibility and success of each approach. This tool also emphasizes that management plans need to be adaptive and incorporate oversight from professionals familiar with measuring risks of fish diseases, and treatments (e.g. the fish health

  18. Health effects of exposure to organic dust in workers of a modern hatchery.

    Science.gov (United States)

    Skórska, Czesława; Mackiewicz, Barbara; Golec, Marcin; Cholewa, Grazyna; Chmielowiec-Korzeniowska, Anna; Dutkiewicz, Jacek

    2007-01-01

    The aim of the presented study was to determine the health status of workers occupationally exposed to moderate amounts of organic dust, employed in a modern hatchery with an efficient ventilation system. A group of 32 hatchery workers was examined. As a reference group, 50 urban dwellers not exposed to any kind of organic dust were examined. All people were interviewed for the presence of work-related symptoms and subjected to physical and spirometric examinations. Blood sera were examined for the presence of precipitins against 13 antigens associated with organic dust, and for the presence of total and chicken-specific No significant differences were found between the spirometric values in the group of hatchery workers and the reference group. Positive precipitin reactions were noted mostly with the antigens of Gram-negative bacteria associated with organic dust. The frequencies of positive reactions to antigens of Escherichia coli and Acinetobacter baumannii in hatchery workers were significantly greater compared to the reference group (phatchery workers were significantly greater compared to the reference group (phatchery workers was nearly 3 times greater compared to the reference group, and the difference proved to be statistically significant (pchicken feathers were detected in the blood of hatchery workers and referents. In conclusion, the examined hatchery workers showed a moderate frequency of work-related symptoms, no decline in lung function and low reactivity to most microbial and bird protein allergens. These results suggest that the effects of exposure to organic dust in workers of modern hatcheries with an efficient ventilation system are less compared to the workers of poultry farms, such as broiler or egg laying houses.

  19. Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

    NARCIS (Netherlands)

    Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, J.M.H.

    2009-01-01

    This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the

  20. Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

    NARCIS (Netherlands)

    Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, Jan

    2011-01-01

    This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the

  1. Ecological interactions between hatchery summer steelhead and wild Oncorhynchus mykiss in the Willamette River basin, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Harnish, Ryan A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Green, Ethan D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Vernon, Christopher R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mcmichael, Geoffrey A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-01

    The purpose of this study was to determine the extent to which juvenile hatchery summer steelhead and wild winter steelhead overlap in space and time, to evaluate the extent of residualism among hatchery summer steelhead in the South Santiam River, and to evaluate the potential for negative ecological interactions among hatchery summer steelhead and wild winter steelhead. Because it is not possible to visually discern juvenile winter steelhead from resident rainbow trout, we treated all adipose-intact juvenile O. mykiss as one group that represented juvenile wild winter steelhead. The 2014 study objectives were to 1) estimate the proportion of hatchery summer steelhead that residualized in the South Santiam River in 2014, 2) determine the extent to which hatchery and naturally produced O. mykiss overlapped in space and time in the South Santiam River, and 3) characterize the behavioral interactions between hatchery-origin juvenile summer steelhead and naturally produced O. mykiss. We used a combination of radio telemetry and direct observations (i.e., snorkeling) to determine the potential for negative interactions between hatchery summer and wild winter steelhead juveniles in the South Santiam River. Data collected from these two independent methods indicated that a significant portion of the hatchery summer steelhead released as smolts did not rapidly emigrate from the South Santiam River in 2014. Of the 164 radio-tagged steelhead that volitionally left the hatchery, only 66 (40.2%) were detected outside of the South Santiam River. Forty-four (26.8% of 164) of the radio-tagged hatchery summer steelhead successfully emigrated to Willamette Falls. Thus, the last known location of the majority of the tagged fish (98 of 164 = 59.8%) was in the South Santiam River. Thirty-three of the tagged hatchery steelhead were detected in the South Santiam River during mobile-tracking surveys. Of those, 21 were found to be alive in the South Santiam River over three months after

  2. TWRS Privatization Phase 1 Master Site Plan

    International Nuclear Information System (INIS)

    PARAZIN, R.J.

    1999-01-01

    The U.S. Department of Energy (DOE) has chosen to accomplish the Tank Waste Remediation System disposal mission via privatization. The disposal mission has been divided into two privatization phases. Phase I, a 'proof of concept' phase, will establish and demonstrate the technical, commercial, and procurement capabilities necessary far privatization to proceed. Once established, privatization will be expanded in the form of a second phase (Phase II) to dispose of the remainder of the tank waste. In conjunction with preparation of the Tank Waste Remediation System (TWRS) Privatization Request for Proposals (RFP)(RL, 1996), a location was selected for the Phase I demonstration facilities (Shord, 1996). The location selected was the area previously developed and characterized for the Grout Disposal Site, adjoining the 200 East Area. The site is of sufficient size for a Private Contractor (PC) to carry out pretreatment, immobilization, and vitrification operations and possesses the required characteristics (e.g., close to feed tanks) to best facilitate the Phase I operations. This overall long-range Master Site Plan (MSP) has been developed to establish a ''baseline'' for the (TWRS) Privatization Phase I (TPPI) PC Site. The MSP depicts the planned layout for the PC Site along with various interfaces between the site and other Hanford utilities and functions. The complete integration of TPPl MSP with overall Hanford Site planning process will assist in establishing the PC site and the necessary priorities to meet the Hanford cleanup mission. The MSP has been developed systematically into a comprehensive, safe, flexible, logical and cost-effective plan. The general philosophy behind the preparation of a MSP for the TPPl program is that it will serve as a single source documentation of the planning for the development of the TPPl complex. The effort will plan temporary and permanent land use, utilities, and traffic flow for the overall program. It will identify needs

  3. Effects of hatchery rearing on Florida largemouth bass Micropterus floridanus resource allocation and performance under semi-natural conditions.

    Science.gov (United States)

    Garlock, T M; Monk, C T; Lorenzen, K; Matthews, M D; St Mary, C M

    2014-12-01

    This study examined the growth, activity, metabolism and post-release survival of three groups of Florida largemouth bass Micropterus floridanus: wild-caught fish, hatchery fish reared according to standard practice (hatchery standard) and hatchery fish reared under reduced and unpredictable food provisioning (hatchery manipulated). Hatchery-standard fish differed from wild-caught fish in all measured variables, including survival in semi-natural ponds. Hatchery-standard and hatchery-manipulated fish showed higher activity levels, faster growth and lower standard metabolic rates than wild-caught fish in the hatchery. Fish reared under the manipulated feeding regime showed increased metabolic rates and increased post-release growth, similar to wild-caught fish. Their activity levels and post-release survival, however, remained similar to those of hatchery-standard fish. Activity was negatively correlated with post-release survival and failure of the feed manipulation to reduce activity may have contributed to its failure to improve post-release survival. Activity and post-release survival may be influenced by characteristics of the rearing environment other than the feeding regime, such as stock density or water flow rates. © 2014 The Fisheries Society of the British Isles.

  4. 75 FR 60804 - Nimbus Hatchery Fish Passage Project, Lower American River, California

    Science.gov (United States)

    2010-10-01

    ...). Reclamation maintains the Hatchery to meet mitigation obligations for spawning areas blocked by construction of Nimbus Dam. CDFG operates the Hatchery under a contract with Reclamation and is responsible for... mitigation obligations for spawning areas blocked by the construction of Nimbus Dam. Other objectives are to...

  5. Hatchery-borne Salmonella enterica serovar Tennessee infections in broilers

    DEFF Research Database (Denmark)

    Christensen, J.P.; Brown, D.J.; Madsen, Mogens

    1997-01-01

    . Restriction enzyme analysis of the plasmid ensured that the plasmids from broilers and the hatchery were identical. By analysis of cleaning and disinfection procedures and by sampling of different control points in the hatchery it was shown that S. enterica ser. Tennessee had colonized areas of the hatchers...... which were protected from routine cleaning and disinfection. Subsequent inclusion of these areas into the sanitation programme resulted in the elimination of S. enterica ser. Tennessee from the hatchers, and a decreasing prevalence of S. enterica ser. Tennessee was observed in broiler flocks during...

  6. Environmental impact assessment of fish farm hatcheries ...

    African Journals Online (AJOL)

    Environmental impact assessment of fish farm hatcheries management in lower ... Environmental impact assessments were taken to determine the causes of ... Of significance of impact assessment were activities like air, traffic, noise, had ...

  7. Developing a master plan for hospital solid waste management: A case study

    International Nuclear Information System (INIS)

    Karamouz, Mohammad; Zahraie, Banafsheh; Kerachian, Reza; Jaafarzadeh, Nemat; Mahjouri, Najmeh

    2007-01-01

    Disposal of about 1750 tons of solid wastes per day is the result of a rapid population growth in the province of Khuzestan in the south west of Iran. Most of these wastes, especially hospital solid wastes which have contributed to the pollution of the environment in the study area, are not properly managed considering environmental standards and regulations. In this paper, the framework of a master plan for managing hospital solid wastes is proposed considering different criteria which are usually used for evaluating the pollution of hospital solid waste loads. The effectiveness of the management schemes is also evaluated. In order to rank the hospitals and determine the share of each hospital in the total hospital solid waste pollution load, a multiple criteria decision making technique, namely analytical hierarchy process (AHP), is used. A set of projects are proposed for solid waste pollution control and reduction in the proposed framework. It is partially applied for hospital solid waste management in the province of Khuzestan, Iran. The results have shown that the hospitals located near the capital city of the province, Ahvaz, produce more than 43% of the total hospital solid waste pollution load of the province. The results have also shown the importance of improving management techniques rather than building new facilities. The proposed methodology is used to formulate a master plan for hospital solid waste management

  8. The Architect Carlos Contreras and the master plan of Aguascalientes, 1948. Modern city planning and influence on urban morphology

    Directory of Open Access Journals (Sweden)

    Alejandro Acosta Collazo

    2015-04-01

    Full Text Available This paper aims to analyze the ordering interest related to industry in the city, workers' housing needs, the impact on the phenomenon of the city shape of the moment and building complex urban morphology consistent, positive or negative, with a planning practice. The labor colonies and Industrial guild were the product of a social response to the demands of the manufacturing city in the first half of the twentieth century. Thanks to the Master Plan by architect Carlos Contreras Elizondo for the city of Aguascalientes in 1948. Also, this article seeks to address the impact of the Plan in the historic centreof Aguascalientes, which was modified over the years to meet the needs that arose.

  9. Master plan study - District heating Kohtla-Jaerve and Johvi municipalities. Estonia. Final report. Appendices for chapter 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to chapter 7 of the master plan study on district heating in the municipalities of Kohtla-Jarve and Johvi (Estonia) present technical data on production units, also with regard to new facilities. (ARW)

  10. Ammonia disinfection of hatchery waste for elimination of single-stranded RNA viruses.

    Science.gov (United States)

    Emmoth, Eva; Ottoson, Jakob; Albihn, Ann; Belák, Sándor; Vinnerås, Björn

    2011-06-01

    Hatchery waste, an animal by-product of the poultry industry, needs sanitation treatment before further use as fertilizer or as a substrate in biogas or composting plants, owing to the potential presence of opportunistic pathogens, including zoonotic viruses. Effective sanitation is also important in viral epizootic outbreaks and as a routine, ensuring high hygiene standards on farms. This study examined the use of ammonia at different concentrations and temperatures to disinfect hatchery waste. Inactivation kinetics of high-pathogenic avian influenza virus H7N1 and low-pathogenic avian influenza virus H5N3, as representatives of notifiable avian viral diseases, were determined in spiked hatchery waste. Bovine parainfluenza virus type 3, feline coronavirus, and feline calicivirus were used as models for other important avian pathogens, such as Newcastle disease virus, infectious bronchitis virus, and avian hepatitis E virus. Bacteriophage MS2 was also monitored as a stable indicator. Coronavirus was the most sensitive virus, with decimal reduction (D) values of 1.2 and 0.63 h after addition of 0.5% (wt/wt) ammonia at 14 and 25°C, respectively. Under similar conditions, high-pathogenic avian influenza H7N1 was the most resistant, with D values of 3.0 and 1.4 h. MS2 was more resistant than the viruses to all treatments and proved to be a suitable indicator of viral inactivation. The results indicate that ammonia treatment of hatchery waste is efficient in inactivating enveloped and naked single-stranded RNA viruses. Based on the D values and confidence intervals obtained, guidelines for treatment were proposed, and one was successfully validated at full scale at a hatchery, with MS2 added to hatchery waste.

  11. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  12. Hatchery Vaccination Against Poultry Viral Diseases: Potential Mechanisms and Limitations.

    Science.gov (United States)

    Abdul-Cader, Mohamed Sarjoon; Palomino-Tapia, Victor; Amarasinghe, Aruna; Ahmed-Hassan, Hanaa; De Silva Senapathi, Upasama; Abdul-Careem, Mohamed Faizal

    Commercial broiler and layer chickens are heavily vaccinated against economically important viral diseases with a view of preventing morbidity, mortality, and production impacts encountered during short production cycles. Hatchery vaccination is performed through in ovo embryo vaccination prehatch or spray and subcutaneous vaccinations performed at the day of hatch before the day-old chickens are being placed in barns with potentially contaminated environments. Commercially, multiple vaccines (e.g., live, live attenuated, and viral vectored vaccines) are available to administer through these routes within a short period (embryo day 18 prehatch to day 1 posthatch). Although the ability to mount immune response, especially the adaptive immune response, is not optimal around the hatch, it is possible that the efficacy of these vaccines depends partly on innate host responses elicited in response to replicating vaccine viruses. This review focuses on the current knowledge of hatchery vaccination in poultry and potential mechanisms of hatchery vaccine-mediated protective responses and limitations.

  13. A review on salt lake city, Kolkata, India: Master planning and realization

    Directory of Open Access Journals (Sweden)

    Tošković Dobrivoje

    2008-01-01

    Full Text Available Motivation for construction of Salt Lake City comes from the circumstances characterizing life in Calcutta known by its social, political and cultural activities. Among many problems, the City was faced with poverty and overcrowding. West Bengal Government realized that serious steps have to be taken to resolve the situation. One of the biggest actions of the Government was creation of so called 'NEDECO' Plan for reclamation certain area of the Salted Lakes, followed by the tender for urban planning. The enterprise for water ways Ivan Milutinović was considered the most convenient for both: reclamation and planning. The Conceptualization covers the Main Aims and interests forming plan basis where three factors were selected: urban character, new vs old town, inhabitants and town growth. Follows Existing Land Use Pattern of the Municipal Area. The realization of the Salt Lake Master Plan, as a part of the Municipal Area, is shown through an Overview of Achieved Infrastructure covering Roads, Water Supply, Sewerage, Area Level Storm Water Drainage, Solid Waste Management and, finally, through the Other Municipal Services, such as: Administrative Infrastructure, Health Infrastructure, Greeneries, Water bodies, Socio-Cultural Infrastructure. .

  14. 20 years of power station master training

    International Nuclear Information System (INIS)

    Schwarz, O.

    1977-01-01

    In the early fifties, the VGB working group 'Power station master training' elaborated plans for systematic and uniform training of power station operating personnel. In 1957, the first power station master course was held. In the meantime, 1.720 power station masters are in possession of a master's certificate of a chamber of commerce and trade. Furthermore, 53 power station masters have recently obtained in courses of the 'Kraftwerksschule e.V.' the know-how which enables them to also carry out their duty as a master in nuclear power stations. (orig.) [de

  15. Genetic differences in growth, migration, and survival between hatchery and wild steelhead and Chinook salmon: Introduction and executive summary

    Science.gov (United States)

    Rubin, Steve P.; Reisenbichler, Reginald; Wetzel, Lisa A.; Hayes, Michael C.

    2012-01-01

    This report presents results of studies testing for genetically based differences in performance (growth, migration, and survival) between hatchery and wild populations of steelhead and Chinook salmon (Project Number 90-052). The report is organized into 10 chapters with a general study introduction preceding the first chapter. A growing body of data shows that domestication and a resulting loss of fitness for natural rearing occur in hatchery populations of anadromous salmonids; however, the magnitude of domestication will vary among species and hatchery programs. Better information on domestication is needed to accurately predict the consequences when hatchery and wild fish interbreed. The intent of hatchery supplementation is to increase natural production through introduction of hatchery fish into natural production areas. The goal of this study was to provide managers with information on the genetic risks of hatchery supplementation to wild populations of Columbia River Basin summer steelhead and spring Chinook salmon.

  16. Evidence for competition at sea between Norton Sound chum salmon and Asian hatchery chum salmon

    Science.gov (United States)

    Ruggerone, Gregory T.; Agler, B.A.; Nielsen, Jennifer L.

    2012-01-01

    Increasing production of hatchery salmon over the past four decades has led to concerns about possible density-dependent effects on wild Pacific salmon populations in the North Pacific Ocean. The concern arises because salmon from distant regions overlap in the ocean, and wild salmon populations having low productivity may compete for food with abundant hatchery populations. We tested the hypothesis that adult length-at-age, age-at-maturation, productivity, and abundance of a Norton Sound, Alaska, chum salmon population were influenced by Asian hatchery chum salmon, which have become exceptionally abundant and surpassed the abundance of wild chum salmon in the North Pacific beginning in the early 1980s. We found that smaller adult length-at-age, delayed age-at-maturation, and reduced productivity and abundance of the Norton Sound salmon population were associated with greater production of Asian hatchery chum salmon since 1965. Modeling of the density-dependent relationship, while controlling for other influential variables, indicated that an increase in adult hatchery chum salmon abundance from 10 million to 80 million adult fish led to a 72% reduction in the abundance of the wild chum salmon population. These findings indicate that competition with hatchery chum salmon contributed to the low productivity and abundance of Norton Sound chum salmon, which includes several stocks that are classified as Stocks of Concern by the State of Alaska. This study provides new evidence indicating that large-scale hatchery production may influence body size, age-at-maturation, productivity and abundance of a distant wild salmon population.

  17. The establishment of master plan for developing advanced I and C technology -The development of advanced instrumentation and control technology-

    International Nuclear Information System (INIS)

    Ham, Chang Shik; Lee, Byung Sun; Kwon, Kee Choon; Lee, Dong Young; Hwang, In Koo; Lee, Jang Soo; Kim, Jung Soo; Kim, Chang Hwoi; Jung, Chul Hwan; Na, Nan Ju; Dong, In Sook; Kang, Soon Gu; Lyu, Chan Ho; Song, Soon Ja

    1994-07-01

    Although several organizations are performing their tasks making efforts to develop new digital technology for application to existing nuclear power plants as well as new plants of the future, their projects are similar to each other and have possibilities of redundant investment. Therefore, KAERI have established a Master Plan to define the suitable work-scope of each Instrumentation and Control (I and C) development project and proceed its development items continuously. Furthermore, in the project, several kinds of advanced technology for application of computer science and digital electronics were studied to obtain better reliability of the I and C systems and reduce opertor's burden. For establishing the Master Plan, functions of I and C system of NPPs were surveyed. Especially EPRI URD was deeply analyzed for setting up a basis of the foreign countries were referred for the Master Plan. For the new technology survey, fault-tolerant control technology and control system performance analysis methods were studied. Requirements of alarm and information system as well as technology of I and C network system of NPPs were also established to introduce the advantages of commercial distributed control system. (Author)

  18. Nez Perce Tribal Hatchery Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Nez Perce Tribal Hatchery (Idaho).

    1996-06-01

    Bonneville Power Administration, the Bureau of Indian Affairs, the Nez Perce Tribe propose a supplementation program to restore chinook salmon to the Clearwater River Subbasin in Idaho. The Clearwater River is a tributary to the Snake River, which empties into the Columbia River. The Nez Perce Tribe would build and operate two central incubation and rearing hatcheries and six satellite facilities. Spring, summer and fall chinook salmon would be reared and acclimated to different areas in the Subbasin and released at the hatchery and satellite sites or in other watercourses throughout the Subbasin. The supplementation program differs from other hatchery programs because the fish would be released at different sizes and would return to reproduce naturally in the areas where they are released. Several environmental issues were identified during scoping: the possibility that the project would fail if mainstem Columbia River juvenile and adult passage problems are not solved; genetic risks to fish listed as endangered or threatened; potential impacts to wild and resident fish stocks because of increase competition for food and space; and water quality. The Proposed Action would affect several important aspects of Nez Perce tribal life, primarily salmon harvest, employment, and fisheries management.

  19. Nez Perce Tribal Hatchery Program: Draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-06-01

    Bonneville Power Administration, the Bureau of Indian Affairs, the Nez Perce Tribe propose a supplementation program to restore chinook salmon to the Clearwater River Subbasin in Idaho. The Clearwater River is a tributary to the Snake River, which empties into the Columbia River. The Nez Perce Tribe would build and operate two central incubation and rearing hatcheries and six satellite facilities. Spring, summer and fall chinook salmon would be reared and acclimated to different areas in the Subbasin and released at the hatchery and satellite sites or in other watercourses throughout the Subbasin. The supplementation program differs from other hatchery programs because the fish would be released at different sizes and would return to reproduce naturally in the areas where they are released. Several environmental issues were identified during scoping: the possibility that the project would fail if mainstem Columbia River juvenile and adult passage problems are not solved; genetic risks to fish listed as endangered or threatened; potential impacts to wild and resident fish stocks because of increase competition for food and space; and water quality. The Proposed Action would affect several important aspects of Nez Perce tribal life, primarily salmon harvest, employment, and fisheries management

  20. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  1. Impact of Urban Heat Island under the Hanoi Master Plan 2030 on Cooling Loads in Residential Buildings

    Directory of Open Access Journals (Sweden)

    Tran Hoang Hai Nam

    2015-01-01

    Full Text Available This study aims to evaluate the influence of urban heat island (UHI under the Hanoi Master Plan 2030 on the energy consumption for space cooling in residential buildings. The weather conditions under the current and future status (master plan condition simulated in the previous study (Trihamdani et al., 2014 were used and cooling loads in all the residential buildings in Hanoi over the hottest month were estimated under the simulated current and future conditions by using the building simulation program, TRNSYS (v17. Three most typical housing types in the city were selected for the simulation. The cooling loads of respective housing types were obtained in each of the districts in Hanoi. The results show that the total cooling loads over June 2010 is approximately 683 Terajoule (TJ under the current status, but it is predicted to increase to 903 TJ under the master plan condition. The increment is largely due to the increase in number of households (203 TJ or 92%, but partially due to the increase in urban temperature, i.e. UHI effect (17 TJ or 8%. The increments in new built-up areas were found to be larger than those in existing built-up areas. The cooling load in apartment is approximately half of that in detached house, which is approximately half of that in row house. Moreover, it was seen that although sensible cooling loads increased with the increase in outdoor temperature, the latent cooling loads decreased due to the decrease in absolute humidity and the increase in air temperature.

  2. Master plan envisions multi-billion-dollar expansion of Vietnam's electricity monopoly

    International Nuclear Information System (INIS)

    2001-12-01

    Massive investment in Vietnam's electricity monopoly by Western aid and export credit agencies form part of the ten-year master plan developed for Vietnam. Central planning and political patronage, instead of market assessments and customer choice form the basis for monopoly investments in a centralized grid linking big hydro, gas, coal, and nuclear power projects. Western aid agencies might effectively crowd out viable private-sector energy investments by financing power projects considered too large and risky by the private sector. These investments by Western aid agencies would assist in winning contracts for favoured exporters of engineering services and equipment. It would be a breeding ground for corruption in Vietnam if market discipline, public oversight, and enforceable property rights are not present in the face of power sector aid. There is a real possibility that damages to the environment could result from electricity investments, and some communities might be victimized, electricity costs might increase, the indebtedness level of the population might increase

  3. Fuzzy modeling to predict chicken egg hatchability in commercial hatchery.

    Science.gov (United States)

    Peruzzi, N J; Scala, N L; Macari, M; Furlan, R L; Meyer, A D; Fernandez-Alarcon, M F; Kroetz Neto, F L; Souza, F A

    2012-10-01

    Experimental studies have shown that hatching rate depends, among other factors, on the main physical characteristics of the eggs. The physical parameters used in our work were egg weight, eggshell thickness, egg sphericity, and yolk per albumen ratio. The relationships of these parameters in the incubation process were modeled by Fuzzy logic. The rules of the Fuzzy modeling were based on the analysis of the physical characteristics of the hatching eggs and the respective hatching rate using a commercial hatchery by applying a trapezoidal membership function into the modeling process. The implementations were performed in software. Aiming to compare the Fuzzy with a statistical modeling, the same data obtained in the commercial hatchery were analyzed using multiple linear regression. The estimated parameters of multiple linear regressions were based on a backward selection procedure. The results showed that the determination coefficient and the mean square error were higher using the Fuzzy method when compared with the statistical modeling. Furthermore, the predicted hatchability rates by Fuzzy Logic agreed with hatching rates obtained in the commercial hatchery.

  4. Master plan study - District heating Kohtla-Jaerve and Johvi municipalities. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to chapter nine of the final report of the master plan study on district heating in the municipalities of Kohtla-Jarve and Johvi municipalities (Estonia) present extensive data relating to economic, financial and environmental calculations, fuel consumption, energy balance and prices. (ARW)

  5. And the Sky Is Grey: The Ambivalent Outcomes of the California Master Plan for Higher Education

    Science.gov (United States)

    Marginson, Simon

    2018-01-01

    In the 1960 Master Plan for Higher Education, California in the United States famously combined the principles of excellence and access within a steep three-tiered system of Higher Education. It fashioned the world's strongest system of public research universities, while creating an open access system that brought college to millions of American…

  6. Sherman Creek Hatchery; Washington Department of Fish and Wildlife Fish Program, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lovrak, Jon (Washington Department of Fish and Wildlife, Fish Management Program, Hatcheries Division, Ford, WA); Combs, Mitch (Washington Department of Fish and Wildlife, Fish Management Program, Hatcheries Division, Kettle Falls, WA)

    2004-01-01

    Sherman Creek Hatchery's primary objective is the restoration and enhancement of the recreational and subsistence fishery in Lake Roosevelt and Banks Lake. The Sherman Creek Hatchery (SCH) was designed to rear 1.7 million kokanee fry for acclimation and imprinting during the spring and early summer. Additionally, it was designed to trap all available returning adult kokanee during the fall for broodstock operation and evaluation. Since the start of this program, the operations on Lake Roosevelt have been modified to better achieve program goals. The Washington Department of Fish and Wildlife, Spokane Tribe of Indians and the Colville Confederated Tribes form the interagency Lake Roosevelt Hatcheries Coordination Team (LRHCT) which sets goals and objectives for both Sherman Creek and the Spokane Tribal Hatchery. The LRHCT also serves to coordinate enhancement efforts on Lake Roosevelt and Banks Lake. Since 1994 the kokanee fingerling program has changed to yearling releases. By utilizing both the hatcheries and additional net pens, up to 1,000,000 kokanee yearlings can be reared and released. The construction and operation of twenty net pens in 2001 enabled the increased production. Another significant change has been to rear up to 300,000 rainbow trout fingerling at SCH from July through October, for stocking into the volunteer net pens. This enables the Spokane Tribal Hatchery (STH) to rear additional kokanee to further the enhancement efforts on Lake Roosevelt. Current objectives include increased use of native tributary stocks where available for propagation into Upper Columbia River Basin waters. The Lake Roosevelt Fisheries Evaluation Program (LRFEP) is responsible for monitoring and evaluation on the Lake Roosevelt Projects. From 1988 to 1998, the principal sport fishery on Lake Roosevelt has shifted from walleye to include rainbow trout and kokanee salmon (Underwood et al. 1997, Tilson and Scholz 1997). The angler use, harvest rates for rainbow and

  7. Assessing the impact of stocking northern-origin hatchery brook trout on the genetics of wild populations in North Carolina

    Science.gov (United States)

    Kazyak, David C.; Rash, Jacob; Lubinski, Barbara A.; King, Tim L.

    2018-01-01

    The release of hatchery-origin fish into streams with endemics can degrade the genetics of wild populations if interbreeding occurs. Starting in the 1800s, brook trout descendent from wild populations in the northeastern United States were stocked from hatcheries into streams across broad areas of North America to create and enhance fishery resources. Across the southeastern United States, many millions of hatchery-origin brook trout have been released into hundreds of streams, but the extent of introgression with native populations is not well resolved despite large phylogeographic distances between these groups. We used three assessment approaches based on 12 microsatellite loci to examine the extent of hatchery introgression in 406 wild brook trout populations in North Carolina. We found high levels of differentiation among most collections (mean F′ST = 0.718), and among most wild collections and hatchery strains (mean F′ST = 0.732). Our assessment of hatchery introgression was consistent across the three metrics, and indicated that most wild populations have not been strongly influenced by supplemental stocking. However, a small proportion of wild populations in North Carolina appear to have been strongly influenced by stocked conspecifics, or in some cases, may have been founded entirely by hatchery lineages. In addition, we found significant differences in the apparent extent of hatchery introgression among major watersheds, with the Savannah River being the most strongly impacted. Conversely, populations in the Pee Dee River watershed showed little to no evidence of hatchery introgression. Our study represents the first large-scale effort to quantify the extent of hatchery introgression across brook trout populations in the southern Appalachians using highly polymorphic microsatellite markers.

  8. Vibrio Bacteria Counts from Hatcheries and Shellfish Beds

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — From 1996 to the present samples of water, sediment and macerated oyster set (Crassostrea virginica, Gmelin) taken at low tide at a Long Island oyster hatchery were...

  9. Istra district heating system. General technical report. Appendix 1 to the master plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    The objective of the master plan project is to improve the heat supply in Istra. The considerable system losses from the fuel supplied to the end-users are one issue for improvement. At the same time, the current system operation results in poor quality heat for the consumers. Due to the inflexibility of the system the dwellings/premises of the consumers are either overheated or insufficiently heated. The financial situation in Istra, the legal ownership of the district heating system and consumers' lacking ability to pay limit the possibilities for system improvements. The Master Plan and Feasibility Study evaluates four different development scenarios. Each of the scenarios is compared to the current situation in Istra, where nothing is done to change the system, but only to operate the present system in a sustainable way. The sustainable operation of the district heating system includes all necessary renovations and component replacements necessary. The project does not take into account the present financial situation in Istra, which has resulted in less maintenance than necessary. This situation is not a comparable parameter, as it is not sustainable and will lead to a breakdown of the heat supply within a short time horizon. The General Technical Report evaluates the technical situation and describes system improvements at a general level. The intention with this report is to provide important information useful to other district heating companies in Russia. (au)

  10. Simulated hatchery system to assess bacteriophage efficacy against Vibrio harveyi.

    Science.gov (United States)

    Raghu Patil, J; Desai, Srividya Narayanamurthy; Roy, Panchali; Durgaiah, Murali; Saravanan, R Sanjeev; Vipra, Aradhana

    2014-12-02

    Vibriosis caused by luminous Vibrio harveyi commonly contributes to poor survival in shrimp hatcheries and aquaculture ponds. Lytic bacteriophages pathogenic for V. harveyi are currently being investigated as an alternative to antibiotics to prevent vibriosis. Here, 8 bacteriophages were isolated from oysters and clams using V. harveyi strains as baiting hosts. Among these bacteriophages, 1 strain (VHP6b) identified as broadly pathogenic for 27 V. harveyi strains examined was further characterized by electron microscopy and genome sequence analysis. Phage VHP6b possessed a tail and morphology consistent with it being a member of the family Siphoviridae, and its genome and proteome were most closely related to the Vibrio phages SSP02 and MAR10. An integrase gene essential for lysogeny was not evident. The ability of bacteriophage VHP6b to protect shrimp postlarvae against vibriosis caused by V. harveyi strain VH6 was demonstrated in a model system designed to simulate typical hatchery conditions. Bacteriophage treatment improved survival of postlarvae by 40 to 60% under these conditions, so therapies based on this or other bacteriophages may be useful in shrimp hatcheries.

  11. Experience of Sponge City Master Plan: A Case Study of Nanning City

    Institute of Scientific and Technical Information of China (English)

    Zhang Wei; Wang Jiazhuo; Che Han; Wang Chen; Zhang Chunyang; Shi Lian; Fan Jin; Li Caige

    2017-01-01

    As a new urban development pattern, the construction of sponge cities has been deeply integrated into the new urbanization and water safety strategy. Nanning City, as one of the first batch of experimental sponge cities in China, has undertaken exploration and practice on sponge city planning, construction, and management. The sponge city master plan of Nanning City establishes an urban ecological spatial pattern in order to protect the security of the sponge base. The sponge city construction strategy has also proposed an overall construction strategy of a sponge city in line with urban development features. Through the systematic analysis and planning, a “23+10+202” pattern of sponge city construction has been formed. “23” represents 23 drainage basins, in which major sponge facilities such as storage facilities, waterfront buffer zones, wetland parks, ecological rainwater corridor and sponge parks are allocated. “10” represents 10 sponge functional zones, which provide important reference for the establishment of sponge city construction index system. “202” represents 202 management units, which decomposes the general objective and provides technical support not only for sponge city construction and management, but also for the implementation of general objectives in the regulatory plan as well.

  12. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Knudsen, Curtis M. (Oncorh Consulting, Olympia, WA)

    2003-05-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from Oncorh Consulting to the Washington Department of Fish and Wildlife (WDFW), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning, and (2) summarize results of research that have broader scientific relevance. This is the second in a series of reports that address reproductive ecological research and monitoring of spring chinook in the Yakima River basin. In addition to within-year comparisons, between-year comparisons will be made to determine if traits of the wild Naches basin control population, the naturally spawning population in the upper Yakima River and the hatchery control population are diverging over time. This annual report summarizes data collected between April 1, 2002 and March 31, 2003. In the future, these data will be compared to previous years to identify general trends and make preliminary comparisons. Supplementation success in the Yakima Klickitat Fishery Project's (YKFP) spring chinook (Oncorhynchus tshawytscha) program is defined as increasing natural production and harvest opportunities, while keeping adverse ecological interactions and genetic impacts within acceptable bounds (Busack et al. 1997). Within this context demographics, phenotypic traits, and reproductive ecology have significance because they directly affect natural productivity. In addition, significant changes in locally adapted traits due to hatchery influence, i.e. domestication, would likely be maladaptive resulting in reduced population productivity and fitness (Taylor 1991; Hard 1995). Thus, there is a need to study demographic and phenotypic traits in the YKFP in order to understand hatchery and wild population productivity, reproductive ecology, and the effects of domestication (Busack et al. 1997). Tracking trends in these traits over time is also a critical aspect of domestication monitoring (Busack

  13. Characterization of estuary use by Nisqually Hatchery Chinook based on Otolith analysis

    Science.gov (United States)

    Lind-Null, Angie M.; Larsen, Kim A.; Reisenbichler, Reg

    2008-01-01

    INTRODUCTION The Nisqually Fall Chinook population is one of 27 stocks in the Puget Sound evolutionarily significant unit listed as threatened under the federal Endangered Species Act (ESA). Preservation and extensive restoration of the Nisqually delta ecosystem are planned to assist in recovery of the stock. A pre-restoration baseline including life history types, estuary residence time, growth rates, and habitat use are needed to evaluate the potential response of hatchery and wild Chinook salmon to restoration. Otolith analysis has been selected as a means to examine Chinook salmon life history, growth, and residence in the Nisqually estuary. Over time, the information from the otolith analyses will be used to: 1) determine if estuary restoration actions cause changes to the population structure (i.e. frequency of the different life history trajectories) for Nisqually River Chinook, 2) compare pre- and post- restoration residence times and growth rates, 3) suggest whether estuary restoration yields substantial benefits for Chinook salmon through (1) and (2), and 4) compare differences in habitat use between hatchery and wild Chinook to further protect ESA listed stock. Otoliths are calcium carbonate structures in the inner ear that grow in proportion to the overall growth of the fish. Daily growth increments can be measured so date and fish size at various habitat transitions can be back-calculated. Careful analysis of otolith microstructure can be used to determine the number of days that a fish resided in the estuary as a juvenile (increment counts), size at entrance to the estuary, size at egress, and the amount that the fish grew while in the estuary. Juvenile hatchery Chinook salmon are generally released as smolts that move quickly through the delta with much shorter residence times than for many wild fish and are not dependent on the delta as nursery habitat (Myers and Horton 1982; Mace 1983; Levings et al. 1986). The purpose of this study is to use and

  14. An overview of diseases in fish hatcheries and nurseries

    Directory of Open Access Journals (Sweden)

    Md. Ali Reza Faruk

    2017-12-01

    Full Text Available Quality and healthy fish seed is the prerequisite for sustainable aquaculture. A major challenge to the expansion of aquaculture production is the outbreak of diseases. Disease induced mortality is a serious issue for the fish seed industry. The immature immune system in fish makes the early developmental stages more susceptible to infectious diseases. Common fish diseases in hatcheries and in early rearing systems are caused by protozoan, ciliates, myxosporodians, worms, opportunistic bacteria and fungi. Production of healthy fish seed and survivality depends on the proper health management, maintenance of good water quality, proper nutrition and application of biosecurity measures. The paper highlighted the different types of diseases, causative agents and their prevention and control measures in fish hatcheries and nurseries. [Fundam Appl Agric 2017; 2(3.000: 311-316

  15. Double Star project - master science operations plan

    Science.gov (United States)

    Shen, C.; Liu, Z.

    2005-11-01

    For Double Star Project (DSP) exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2) and during the mission operating phase, the long-term and short-term master science operations plans (MSOP) were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  16. Double Star project - master science operations plan

    Directory of Open Access Journals (Sweden)

    C. Shen

    2005-11-01

    Full Text Available For Double Star Project (DSP exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2 and during the mission operating phase, the long-term and short-term master science operations plans (MSOP were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  17. EXPLORATION ON TECHNICAL REFORM OF STRATEGIC PLANNING AND URBAN MASTER PLANNING THROUGH THE ANALYSIS ON THEIR RELATIONSHIP%从战略规划与总体规划关系探讨两者技术改革

    Institute of Scientific and Technical Information of China (English)

    赵艳莉; 郑声轩; 张卓如

    2012-01-01

    Through the comparative analysis on the concept features and technical contents of strategic planning and master planning, this paper analyzes the types of urban strategic planning and clarifies the status and role of strategic planning in the planning system of China. Through the case study on the interaction between strategic planning and master planning, the paper elaborates their mutual supporting and complementary relationship, and points out that emphasizing the differentiated development of these two kinds of planning is favorable for the technical progress of planning, and that strategic planning should focus on goal guidance and master planning should strengthen the comprehensive control.%比较分析了战略规划与总体规划的概念特征及技术内容,并梳理城市发展战略规划的几种类型,认识战略规划在我国规划体系中的地位、作用.通过战略规划与总体规划互动的规划案例阐明两者互为支撑、互为补充的关系,提出强调两者的差异化发展有利于规划技术进步,战略规划应突出目标引导性,总体规划应加强综合控制性.

  18. Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Willard, Catherine; Baker, Dan J.; Heindel, Jeff A. (Idaho Department of Fish and Game, Boise, ID)

    2003-12-01

    On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Oceanic and Atmospheric Administration at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Oceanic and Atmospheric Administration are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases (annual report to the Bonneville Power Administration for the research element of the program) are also reported separately. Captive broodstock program activities conducted between January 1, 2002 and December 31, 2002 for the hatchery element of the program are presented in this report. n 2002, 22 anadromous sockeye salmon returned to the Sawtooth Valley. Fifteen of these adults were captured at adult weirs located on the upper Salmon River and on Redfish Lake Creek. Seven of the anadromous sockeye salmon that returned were observed below the Sawtooth Fish Hatchery weir and allowed to migrate upstream volitionally (following the dismantling of the weir on September 30, 2002). All adult returns were released to Redfish Lake for natural spawning. Based on their marks, returning adult sockeye salmon originated from a variety of release options. Sixty-six females from brood year 1999 and 28 females from brood year 2000 captive broodstock groups were spawned at the Eagle Hatchery in 2002. Spawn pairings produced approximately 65

  19. Umatilla Hatchery Monitoring and Evaluation, 1997-1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, Michael C.; Brown, Kassandra A.; Waln, Karen (Oregon Department of Fish and Wildlife, Portland, OR)

    1999-11-01

    This report summarizes monitoring and evaluation studies of salmonids reared at Umatilla Fish Hatchery (UFH) for the period November 1, 1997 to October 31, 1998. Studies at Umatilla Hatchery are designed to evaluate rearing of chinook salmon and steelhead in ''Michigan raceways''. Characteristics of Michigan raceways include high fish densities, rapid water turnover, oxygen supplementation, reuse of water, and baffles designed to reduce cleaning. Fish health at UFH and other facilities associated with the Umatilla program are intensively monitored and evaluated as part of the overall research project. Further, under the Integrated Hatchery Operations Team guidelines, specific requirements for fish health monitoring are mandatory and have become the responsibility of the fish health staff conducting studies at UFH. Additional studies include evaluations of sport fisheries in the Umatilla River and mass marking and straying of fall chinook salmon. Except for adult recovery data, an experiment designed to evaluate rearing subyearling fall chinook salmon in Michigan and Oregon raceways has been completed. We are currently in the second year of rearing subyearling fall chinook salmon at three densities. Experimental rearing of subyearling, fall release, and yearling spring chinook salmon, and steelhead has also been conducted. Although preliminary adult return data has been recovered, data on smolt-to-adult survival for all groups is incomplete. Conclusions in this report should be viewed as preliminary and used in conjunction with additional data as it becomes available.

  20. Methow River Steelhead - Methow River Steelhead hatchery reform research

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Steelhead in Pacific Northwest hatcheries are typically reared for release as 1-year-old smolts, rather than the 2and 3-year-old smolt life history patterns found in...

  1. Constraints to adoption of improved hatchery management practices among catfish farmers in Lagos State

    Directory of Open Access Journals (Sweden)

    Oghenetejiri DIGUN-AWETO

    2017-11-01

    Full Text Available Aquaculture has shown capacities to serve as means of livelihood, improve living standards, provide employment and generate foreign exchange in many countries. Recent investment in Nigerian aquaculture has been target towards catfish farming. However, small quantity and poor quality fish seeds are one of the problems limiting production. Consequently, Lagos State government introduced improved breeding and hatchery management practices as a package to fish hatchery operators with the aim of improving fish seed quantity and quality in the state. Nevertheless, the dissemination of the package has not yielded the desired result. This study assessed the constraints to adoption of improved hatchery management practices among catfish farmers in Lagos State. With structured questionnaire, 150 catfish farmers, randomly selected from 12 local government areas spread across Lagos State were interviewed. Despite that majority of the respondents strongly agreed or agreed to the fact that improved hatchery management practices have positive impacts on breeding, hatching, and survival of fish fry, majority of them affirmed that high cost of acquisition, high technicality in using the improved management practices as well as inadequate information about the improved management practices are primary reasons for non-adoption of some of the improved practices. Some of the limitations faced by the respondents include insufficient capital, lack of technical expertise to use the methods adequately, non-availability of inputs, expensive cost of facility maintenance, poor information dissemination and insufficient technical support from the extension agents and the state government. Although the adoption of improved practices has not been total, due to these constraints, the farmers’ knowledge of the improved hatchery management practices is broad. There is a need for the state government to subsidize the improved hatchery technologies and inputs, in addition to

  2. Master Robotic Net

    Directory of Open Access Journals (Sweden)

    Vladimir Lipunov

    2010-01-01

    Full Text Available The main goal of the MASTER-Net project is to produce a unique fast sky survey with all sky observed over a single night down to a limiting magnitude of 19-20. Such a survey will make it possible to address a number of fundamental problems: search for dark energy via the discovery and photometry of supernovae (including SNIa, search for exoplanets, microlensing effects, discovery of minor bodies in the Solar System, and space-junk monitoring. All MASTER telescopes can be guided by alerts, and we plan to observe prompt optical emission from gamma-ray bursts synchronously in several filters and in several polarization planes.

  3. Sherman Creek Hatchery; Washington Department of Fish and Wildlife Fish Program, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Combs, Mitch (Washington Department of Fish and Wildlife, Kettle Falls, WA)

    2002-01-01

    Sherman Creek Hatchery's primary objective is the restoration and enhancement of the recreational and subsistence fishery in Lake Roosevelt and Banks Lake. The Sherman Creek Hatchery (SCH) was designed to rear 1.7 million kokanee fry for acclimation and imprinting during the spring and early summer. Additionally, it was designed to trap all available returning adult kokanee during the fall for broodstock operations and evaluations. Since the start of this program, the operations on Lake Roosevelt have been modified to better achieve program goals. The Washington Department of Fish and Wildlife, Spokane Tribe of Indians and the Colville Confederated Tribe form the interagency Lake Roosevelt Hatcheries Coordination Team (LRHCT) which sets goals and objectives for both Sherman Creek and the Spokane Tribal Hatchery and serves to coordinate enhancement efforts on Lake Roosevelt and Banks Lake. The primary changes have been to replace the kokanee fingerling program with a yearling (post smolt) program of up to 1,000,000 fish. To construct and operate twenty net pens to handle the increased production. The second significant change was to rear up to 300,000 rainbow trout fingerling at SCH from July through October, for stocking into the volunteer net pens. This enables the Spokane Tribal Hatchery (STH) to rear additional kokanee to further the enhancement efforts on Lake Roosevelt. Current objectives include increased use of native/indigenous stocks where available for propagation into Upper Columbia River Basin Waters. Monitoring and evaluation is preformed by the Lake Roosevelt Fisheries Monitoring Program. From 1988 to 1998, the principle sport fishery on Lake Roosevelt has shifted from walleye to include rainbow trout and kokanee salmon (Underwood et al. 1997, Tilson and Scholz 1997). The angler use, harvest rates for rainbow and kokanee and the economic value of the fishery has increased substantially during this 10-year period. The most recent information from

  4. BACTERIAL FLORA OF HATCHERY ENVIRONMENT AND THEIR IN-VITRO SUSCEPTIBILITY TO ANTIMICROBIAL AGENTS

    Directory of Open Access Journals (Sweden)

    F. M. Khan, H. Afzal and F. Deeba

    2003-04-01

    Full Text Available Four hatcheries, located in and around Faisalabad, were sampled a day before hatch out in six batches for environmental bacterial flora. Hatchery air, egg-shell surface, surfaces of selected locations and water supply samples were taken for this purpose. The percent (relative occurrence of various bacterial species recovered from hatchery environment revealed that Bacillus subtilis was the predominant isolate (26.93%. followed by Escherichia coli (24.08%, Staphylococcus epidermidis (16.32%, Staphylococcus aureus (8.16%, Paratyphoid salmonellae (6.93%, Pseudomonas aeruginosa (4.48%, Citrobacter jreundii (4.08%, Enterococcus faecalis (3.26%, Klebsiella pneumoniae (3.26%, Bordetella avium (1.63% and Proteus vulgaris (0.81%. In second part of the study, bacterial isolates were subjected to in-vitro antibiotic sensitivity to 8 antibiotics of common poultry use. It was found that 98.92, 79.56. 65.59, 61.29, 61.29, 61.29, 53.76 and 38.70 percent of bacterial isolates were sensitive to Norfloxacin, Gentamicin, Neomycin, Chloramphenicol, Doxycycline, Flumequine, Erythromycin, and Ampicillin, respectively. In the final part of the study, bacterial isolates were tested for resistance to 3 commerical hatchery disinfectants (TH4®, Aldekol Des® 0.2, and Bromosept 10% soln. ®. Only 3.22% of the isolates showed resistance at manufacturer's recommended dilution (MRD levels while 11.82% of the isolates showed resistance at concentrations below the MRD levels.

  5. Master Plan UMKM Berbasis Perikanan untuk Meningkatkan Pengolahan Produk Ikan yang Memiliki Nilai Tambah Tinggi

    OpenAIRE

    Meydianawathi, Luh Gede; Wiagustini, Ni Luh Putu; Riana, I Gede

    2014-01-01

    This research aims to generate a Master plan of fisheries-based SME development concept in Bali region, in order to build Bali as the centre for production and processing of fishery products in the Coridor of Bali-Nusa Tenggara. In Year-1 of the study period, the research activities carried out includes three processes, including analysis of the potensial of SMEs, analyzes the business cycle, and identification of barriers and chalenges. By using the method of linear regression analysis, Geog...

  6. Nez Perce Tribal Hatchery Program : Draft Environmental Impact Statement Summary.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Nez Perce Tribal Hatchery (Idaho)

    1996-06-01

    This summary gives the major points of the Draft Environmental Impact Statement (EIS) prepared for the Nez Perce Tribal Hatchery by the Nez Perce Tribe (NPT), the Bonneville Power Administration (BPA), the Bureau of Indian Affairs (BIA), and other interested parties. The Nez Perce once were one of the largest Plateau tribes in the Northwest and occupied a territory that included north central Idaho, southeastern Washington and northeastern Oregon. Salmon and other migratory fish species are an invaluable food resource and an integral part of the Nez Perce Tribe`s culture. Anadromous fish have always made up the bulk of the Nez Perce tribal diet and this dependence on salmon was recognized in the treaties made with the Tribe by the US. The historic economic, social, and religious significance of the fish to the Nez Perce Tribe continues to this day, which makes the decline of fish populations in the Columbia River Basin a substantial detrimental impact to the Nez Perce way of life. The Nez Perce Tribal Hatchery is a supplementation program that would rear and release spring, summer, and fall chinook (Oncorhynchus tshawytscha), biologically similar to wild fish, to reproduce in the Clearwater River Subbasin. Program managers propose techniques that are compatible with existing aquatic and riparian ecosystems and would integrate hatchery-produced salmon into the stream and river environments needed to complete their life cycle.

  7. Nez Perce Tribal Hatchery Program: Draft environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1996-06-01

    This summary gives the major points of the Draft Environmental Impact Statement (EIS) prepared for the Nez Perce Tribal Hatchery by the Nez Perce Tribe (NPT), the Bonneville Power Administration (BPA), the Bureau of Indian Affairs (BIA), and other interested parties. The Nez Perce once were one of the largest Plateau tribes in the Northwest and occupied a territory that included north central Idaho, southeastern Washington and northeastern Oregon. Salmon and other migratory fish species are an invaluable food resource and an integral part of the Nez Perce Tribe's culture. Anadromous fish have always made up the bulk of the Nez Perce tribal diet and this dependence on salmon was recognized in the treaties made with the Tribe by the US. The historic economic, social, and religious significance of the fish to the Nez Perce Tribe continues to this day, which makes the decline of fish populations in the Columbia River Basin a substantial detrimental impact to the Nez Perce way of life. The Nez Perce Tribal Hatchery is a supplementation program that would rear and release spring, summer, and fall chinook (Oncorhynchus tshawytscha), biologically similar to wild fish, to reproduce in the Clearwater River Subbasin. Program managers propose techniques that are compatible with existing aquatic and riparian ecosystems and would integrate hatchery-produced salmon into the stream and river environments needed to complete their life cycle

  8. 78 FR 18967 - Walla Walla Basin Spring Chinook Hatchery Program

    Science.gov (United States)

    2013-03-28

    ... and various agencies to improve stream flow and fish habitat in the Walla Walla basin. The hatchery is... rearing, and water treatment); sixteen outdoor rearing raceways; a smolt release channel; a shop building...

  9. Master-slave control with trajectory planning and Bouc-Wen model for tracking control of piezo-driven stage

    Science.gov (United States)

    Lu, Xiaojun; Liu, Changli; Chen, Lei

    2018-04-01

    In this paper, a redundant Piezo-driven stage having 3RRR compliant mechanism is introduced, we propose the master-slave control with trajectory planning (MSCTP) strategy and Bouc-Wen model to improve its micro-motion tracking performance. The advantage of the proposed controller lies in that its implementation only requires a simple control strategy without the complexity of modeling to avoid the master PEA's tracking error. The dynamic model of slave PEA system with Bouc-Wen hysteresis is established and identified via particle swarm optimization (PSO) approach. The Piezo-driven stage with operating period T=1s and 2s is implemented to track a prescribed circle. The simulation results show that MSCTP with Bouc-Wen model reduces the trajectory tracking errors to the range of the accuracy of our available measurement.

  10. Imprinting Hatchery Reared Salmon and Steelhead Trout for Homing, Volume III of III; Disease and Physiology Supplements, 1978-1983 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Slatick, Emil; Gilbreath, Lyle G.; Harmon, Jerrel R. (Northwest and Alaska Fisheries Science Centr, Coastal Zone and Estuarine Studies Division, Seattle, WA)

    1988-02-03

    The main functions of the National Marine Fisheries Service (NMFS) Aquaculture Task biologists and contractual scientists involved in the 1978 homing studies were primarily a surveillance of fish physiology, disease, and relative survival during culture in marine net-pens, to determine if there were any unusual factors that might affect imprinting and homing behavior. The studies were conducted with little background knowledge of the implications of disease and physiology on imprinting and homing in salmonids. The health status of the stocks was quite variable as could be expected. The Dworshak and Wells Hatcheries steelhead suffered from some early stresses in seawater, probably osmoregulatory. The incidences of latent BKD in the Wells and Chelan Hatcheries steelhead and Kooskia Hatchery spring chinook salmon were extremely high, and how these will affect survival in the ocean is not known. Gill enzyme activity in the Dworshak and Chelan Hatcheries steelhead at release was low. Of the steelhead, survival in the Tucannon Hatchery stock will probably be the highest, with Dworshak Hatchery stock the lowest. This report contains five previously published papers.

  11. Dust exposure and health of workers in duck hatcheries

    Directory of Open Access Journals (Sweden)

    Marie-Thérèse Guillam

    2017-07-01

    Hatchery workers were at increased risk of compromised respiratory health due to dust exposure, particularly those who work in sorting rooms. Asthma and rhinitis were in excess in this population of workers. Thorough clinical examination of these workers should be performed and all exposures assessed.

  12. FISH HATCHERY IN THE MUNICIPALITY OF BOSANSKA KRUPA IN NORTHWESTERN BOSNIA AND HERZEGOVINA: A SUSTAINABLE DEVELOPMENT PILOT PROJECT

    Directory of Open Access Journals (Sweden)

    N. Ajanovic

    2010-04-01

    Full Text Available The Norwegian Government financed the project GCP/BIH/003/NOR “Support to Income Generation through establishment of a Fish Hatchery in Bosnia and Herzegovina”, worth one million US dollars, that includes the construction of a fish hatchery on the banks of the River Krusnica in order to create jobs and incomes for people living with disability in Bosanska Krupa. The hatchery is dedicated to producing local strains of brown trout (Salmo trutta m. fario, grayling (Thymallus thymallus and Danube salmon (Hucho hucho for re–stocking the natural waters of the Krusnica/Una River catchments (and larger Bosnia and Herzegovina and Danube basin, support the rehabilitation of fish populations and to help revitalize local tourism. The Regional Office for Europe and Central Asia (REU of the Food and Agricultural Organization of the United Nations (FAO, based in Budapest, Hungary implements the project in close collaboration with the Sport Fishermen’s Association of Krusnica, which currently has 351 members. A fish hatchery, a pilot Recirculation Aquaculture System (RAS in the valley of the River Krusnica, is the first of its kind in Bosnia and Herzegovina. It is suitable for production of 250,000 to 450,000 fingerlings annually. Five war invalids are employed at the hatchery continuously since fish production began in November of 2008. The production technology learned by the staff abroad was adapted to the local conditions. The hatchery is expected to be self–sustainable in its operation from sale of fingerlings. Since the hatchery activity has received wider publicity, anglers’ interest in the River Krusnica and River Una has increased. Further increase in the number of visitors is expected after restocking the fish into the river, since the bigger fish populations will attract more and more anglers.

  13. Optimal Pricing and Production Master Planning in a Multiperiod Horizon Considering Capacity and Inventory Constraints

    Directory of Open Access Journals (Sweden)

    Neale R. Smith

    2009-01-01

    Full Text Available We formulate and solve a single-item joint pricing and master planning optimization problem with capacity and inventory constrains. The objective is to maximize profits over a discrete-time multiperiod horizon. The solution process consists of two steps. First, we solve the single-period problem exactly. Second, using the exact solution of the single-period problem, we solve the multiperiod problem using a dynamic programming approach. The solution process and the importance of considering both capacity and inventory constraints are illustrated with numerical examples.

  14. Relying on fin erosion to identify hatchery-reared brown trout in a Tennessee river

    Science.gov (United States)

    Meerbeek, Jonathan R.; Bettoli, Phillip William

    2012-01-01

    Hatchery-induced fin erosion can be used to identify recently stocked catchable-size brown trout Salmo trutta during annual surveys to qualitatively estimate contributions to a fishery. However, little is known about the longevity of this mark and its effectiveness as a short-term (≤ 1 year) mass-marking technique. We evaluated hatchery-induced pectoral fin erosion as a mass-marking technique for short-term stocking evaluations by stocking microtagged brown trout in a tailwater and repeatedly sampling those fish to observe and measure their pectoral fins. At Dale Hollow National Fish Hatchery, 99.1% (228 of 230) of microtagged brown trout in outdoor concrete raceways had eroded pectoral fins 1 d prior to stocking. Between 34 and 68 microtagged and 26-35 wild brown trout were collected during eight subsequent electrofishing samples. In a blind test based on visual examination of pectoral fins at up to 322 d poststocking, one observer correctly identified 91.7% to 100.0% (mean of 96.9%) of microtagged brown trout prior to checking for microtags. In the laboratory, pectoral fin length and width measurements were recorded to statistically compare the fin measurements of wild and microtagged hatchery brown trout. With only one exception, all pectoral fin measurements on each date averaged significantly larger for wild trout than for microtagged brown trout. Based on the number of pectoral fin measurements falling below 95% prediction intervals, 93.7% (148 of 158) of microtagged trout were correctly identified as hatchery fish based on regression models up to 160 d poststocking. Only 72.2% (70 of 97) of microtagged trout were identified correctly after 160 d based on pectoral fin measurements and the regression models. We concluded that visual examination of pectoral fin erosion was a very effective way to identify stocked brown trout for up to 322 d poststocking.

  15. Assessing genetic diversity of wild and hatchery samples of the Chinese sucker (Myxocyprinus asiaticus) by the mitochondrial DNA control region.

    Science.gov (United States)

    Wu, Jiayun; Wu, Bo; Hou, Feixia; Chen, Yongbai; Li, Chong; Song, Zhaobin

    2016-01-01

    To restore the natural populations of Chinese sucker (Myxocyprinus asiaticus), a hatchery release program has been underway for nearly 10 years. Using DNA sequences of the mitochondrial control region, we assessed the genetic diversity and genetic structure among samples collected from three sites of the wild population as well as from three hatcheries. The haplotype diversity of the wild samples (h = 0.899-0.975) was significantly higher than that of the hatchery ones (h = 0.296-0.666), but the nucleotide diversity was almost identical between them (π = 0.0170-0.0280). Relatively high gene flow was detected between the hatchery and wild samples. Analysis of effective population size indicated that M. asiaticus living in the Yangtze River has been expanding following a bottleneck in the recent past. Our results suggest the hatchery release programs for M. asiaticus have not reduced the genetic diversity, but have influenced the genetic structure of the species in the upper Yangtze River.

  16. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Harris, Robin; King, Marty [Confederated Tribes of the Umatilla Indian Reservation

    2009-06-10

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho

  17. Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Baker, Dan J,; Heindel, Jeff A.; Kline, Paul A. (Idaho Department of Fish and Game, Boise, ID)

    2005-08-01

    On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Marine Fisheries Service at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Marine Fisheries Service are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases are also reported under separate cover. Captive broodstock program activities conducted between January 1, 1999 and December 31, 1999 are presented in this report. In 1999, seven anadromous sockeye salmon returned to the Sawtooth Valley and were captured at the adult weir located on the upper Salmon River. Four anadromous adults were incorporated in the captive broodstock program spawning design for year 1999. The remaining three adults were released to Redfish Lake for natural spawning. All seven adults were adipose and left ventral fin-clipped, indicating hatchery origin. One sockeye salmon female from the anadromous group and 81 females from the captive broodstock group were spawned at the Eagle Fish Hatchery in 1999. Spawn pairings produced approximately 63,147 eyed-eggs with egg survival to eyed-stage of development averaging 38.97%. Eyed-eggs (20,311), presmolts (40,271), smolts (9,718), and adults (21) were planted or released into Sawtooth Valley waters in 1999. Supplementation strategies involved releases to Redfish Lake, Redfish Lake Creek

  18. Spring outmigration of wild and hatchery chinook salmon and steelhead trout smolts from the Imnaha River, Oregon, February 6, 1995--June 20, 1995

    International Nuclear Information System (INIS)

    Blenden, M.L.; Osborne, R.S.; Kucera, P.A.

    1996-01-01

    For the second consecutive year, the Nez Perce Tribe, in conjunction with the Fish Passage Center, participated in the smolt monitoring program in the Imnaha River. A rotary screw trap was used to collect emigrating wild and hatchery chinook salmon (Oncorhynchus tshawytscha) and steelhead trout (Oncorhynchus mykiss) smolts from February 6 to June 20, 1995. We PIT tagged and released 421 wild chinook salmon smolts, 747 hatchery chinook salmon smolts (445 HxW and 302 HxH), 227 wild steelhead trout smolts and 1,296 hatchery steelhead trout smolts. Cumulative interrogation rates at mainstem Snake and Columbia River dams were 78.4% for wild chinook salmon, 58.9% for hatchery chinook salmon (HxW), 56.6% for hatchery chinook salmon (HxH), 76.2% for wild steelhead trout, and 69.2% for hatchery steelhead trout. Peak outmigration of NPT tagged wild Imnaha River chinook salmon smolts occurred from early to mid-May at Lower Granite, Little Goose, and Lower Monumental Dams. Median and 90% passage dates for wild chinook salmon smolts at Lower Granite Dam were May 1 and May 11, respectively. Continuous spill at Lower Granite Dam was initiated on May 3 and lasted for 51 days. The 90% passage date of wild chinook salmon smolts at Lower Granite Dam (May 11) preceded peak Snake River and Lower Granite (June 6) flows by 26 days. Although hatchery chinook salmon exhibited a shorter outmigration period through the Snake River than their wild counterparts, peak arrival for both groups occurred at approximately the same time. Median and 90% passage dates at Lower Granite Dam for other PIT tagged groups were: hatchery chinook salmon (NPT-HxW) - May 2 and May 13; hatchery chinook salmon (FPC-HxH) - May 8 and May 15; wild steelhead trout - May 2 and May 9; and hatchery steelhead trout (NPT and FPC) - May 31 and June 16. Hatchery steelhead trout displayed small peaks in arrival timing at Lower Granite and Little Goose Dams in mid-May to mid-June

  19. Fish research project -- Oregon: Umatilla Hatchery monitoring and evaluation, project period 1 November 1993--30 October 1994. Annual report 1994

    International Nuclear Information System (INIS)

    Hayes, M.C.; Carmichael, R.W.; Focher, S.M.; Keefe, M.L.; Love, G.W.; Groberg, W.J. Jr.; Hurtado, N.L.; Onjukka, S.T.; Waln, K.

    1994-01-01

    This report covers the first three years of comprehensive monitoring and evaluation of the Umatilla Hatchery. Because the hatchery and the evaluation study and the fish health monitoring investigations are in the early stages of implementation, much of the information contained in this report is preliminary. The majority of the data that is crucial for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available

  20. Georgia Institute of Technology chilled water system evaluation and master plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-15

    As the host of the Olympic Village for the 1996 Atlanta Olympics, Georgia Tech has experienced a surge in construction activities over the last three years. Over 1.3 million square feet of new buildings have been constructed on the Georgia Tech campus. This growth has placed a strain on the Georgia Tech community and challenged the facilities support staff charged with planning and organizing utility services. In concert with Olympic construction, utility planners have worked to ensure long term benefits for Georgia Tech facilities while meeting the short term requirements of the Olympic Games. The concentration of building construction in the northwest quadrant of the campus allowed planners to construct a satellite chilled water plant to serve the needs of this area and provide the opportunity to integrate this section of the campus with the main campus chilled water system. This assessment and master plan, funded in part by the US Department of Energy, has evaluated the chilled water infrastructure at Georgia Tech, identified ongoing problems and made recommendations for long term chilled water infrastructure development and efficiency improvements. The Georgia Tech office of Facilities and RDA Engineering, Inc. have worked together to assemble relevant information and prepare the recommendations contained in this document.

  1. Spring outmigration of wild and hatchery chinook salmon and steelhead trout smolts from the Imnaha River: March 1, 1994--June 15, 1994; TOPICAL

    International Nuclear Information System (INIS)

    Ashe, B.L.; Miller, A.C.; Kucera, P.A.; Blenden, M.L.

    1995-01-01

    In 1994, the Nez Perce Tribe began a smolt monitoring study on the Imnaha River in cooperation with the Fish Passage Center (FPC). A rotary screw trap was used to collect emigrating wild and hatchery chinook salmon (Oncorhynchus tshawytscha) and steelhead trout (Oncorhynchus mykiss) smolts from March 1 to June 15, 1994. We PIT tagged and released 956 wild chinook salmon, 661 hatchery chinook salmon, 1,432 wild steelhead trout and 2,029 hatchery steelhead trout. Cumulative interrogation rates at mainstem Snake and Columbia River dams were 62.2% for wild chinook salmon, 45.2% for hatchery chinook salmon, 51.3% for wild steelhead trout, and 34.3% for hatchery steelhead trout

  2. Comparación del crecimiento de Argopecten purpuratus entre cohortes obtenidas de captación de larvas en ambiente natural y de hatchery Comparison of growth among cohorts obtained Argopecten purpuratus larval recruitment in natural and hatchery

    Directory of Open Access Journals (Sweden)

    Eduardo P Pérez

    2012-11-01

    Full Text Available En Chile los cultivos del ostión del norte Argopecten purpuratus han sido desarrollados intensivamente a partir de la captación de semillas en ambiente natural y desde principios de 1980 con semillas obtenidas en hatchery. Para aportar información sobre el desempeno de semillas de ostión del norte en este estudio se comparó, mediante ANCOVA, el crecimiento en longitud entre cohortes producidas a partir de semillas de ambiente natural y de hatchery en Tongoy, Chile. Se evaluó la consistencia de esta comparación en distintos anos y estaciones, comparándose parejas de cohortes producidas simultáneamente en los anos 2003 (primavera, 2005 (invierno y 2006 (verano. El análisis estadístico mostró que existen diferencias estadísticas significativas entre cohortes obtenidas en ambiente natural y aquellas obtenidas en hatchery. La prueba de Tukey evidenció diferencias significativas entre CN2003 y CH2003 como también entre CN2005 y CH2005, pero no así entre CN2006 y CH2006. Estas diferencias indican que las cohortes de semillas de ambiente natural crecieron más rápido que las de hatchery. La comparación interanual evidenció diferencias estadísticas significativas. Estos resultados son discutidos a la luz de dos factores: la temperatura de cultivo y la heterocigocidad de la población de cultivo.In Chile crops of the northern scallop Argopecten purpuratus have been developed intensively from seeds obtained in natural environment, and since 1980 from hatchery's seed, when this technique could be controlled and developed. In order to provide information on the performance of seeds of northern scallops in this study growth in length between cohorts produced from seeds obtained in natural environment (CN and hatchery (CH in Tongoy (Chile was compared using ANCOVA. We assessed the consistency of this comparison in different years and seasons. The compared cohorts are pairs of cohorts produced simultaneously in the years 2003 (spring, 2005

  3. Microsatellite and mitochondrial DNA polymorphism reveals life history dependent interbreeding between hatchery and wild brown trout ( Salmo trutta L.)

    DEFF Research Database (Denmark)

    Hansen, Michael Møller; Ruzzante, D.E.; Eg Nielsen, Einar

    2000-01-01

    The effects of stocking hatchery trout into wild populations were studied in a Danish river, using microsatellite and mitochondrial DNA (mtDNA) markers. Baseline samples were taken from hatchery trout and wild trout assumed to be unaffected by previous stocking. Also, samples were taken from...... resident and sea trout from a stocked section of the river. Genetic differentiation between the hatchery strain and the local wild population was modest (microsatellite F-ST = 0.06). Using assignment tests, more than 90% of individuals from the baseline samples were classified correctly. Assignment tests...... involving samples from the stocked river section suggested that the contribution by hatchery trout was low among sea trout (trout. Hybrid index analysis and a high percentage of mtDNA haplotypes specific to indigenous trout observed among resident trout that were assigned...

  4. Planning for Production of Freshwater Fish Fry in a Variable Climate in Northern Thailand.

    Science.gov (United States)

    Uppanunchai, Anuwat; Apirumanekul, Chusit; Lebel, Louis

    2015-10-01

    Provision of adequate numbers of quality fish fry is often a key constraint on aquaculture development. The management of climate-related risks in hatchery and nursery management operations has not received much attention, but is likely to be a key element of successful adaptation to climate change in the aquaculture sector. This study explored the sensitivities and vulnerability of freshwater fish fry production in 15 government hatcheries across Northern Thailand to climate variability and evaluated the robustness of the proposed adaptation measures. This study found that hatcheries have to consider several factors when planning production, including: taking into account farmer demand; production capacity of the hatchery; availability of water resources; local climate and other area factors; and, individual species requirements. Nile tilapia is the most commonly cultured species of freshwater fish. Most fry production is done in the wet season, as cold spells and drought conditions disrupt hatchery production and reduce fish farm demand in the dry season. In the wet season, some hatcheries are impacted by floods. Using a set of scenarios to capture major uncertainties and variability in climate, this study suggests a couple of strategies that should help make hatchery operations more climate change resilient, in particular: improving hatchery operations and management to deal better with risks under current climate variability; improving monitoring and information systems so that emerging climate-related risks are known sooner and understood better; and, research and development on alternative species, breeding programs, improving water management and other features of hatchery operations.

  5. Emigration of Natural and Hatchery Chinook Salmon and Steelhead Smolts from the Imnaha River, Oregon, Progress Report 2000-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Cleary, Peter; Kucera, Paul; Blenden, Michael

    2003-12-01

    This report summarizes the emigration studies of the Nez Perce Tribe in the Imnaha River subbasin during the 2001 and 2002 migration years. A migration year for the Imnaha River is defined here as beginning July 31 of the previous year and ending July 30 the following year. The conclusion of the studies at the end of migration year 2002 marked the 11th year of the Nez Perce Tribe's Lower Snake River Emigration Studies. The Nez Perce Tribe has participated in the Fish Passage Center's Smolt Monitoring Program for nine of the 11 years. These studies collect and tag juvenile chinook salmon and steelhead at two locations in the fall, rkm 74 and rkm 7, and at rkm 7 during the spring. Data from captured and tagged fish provide an evaluation of hatchery production and releases strategies, post release survival of hatchery chinook salmon, abundance of natural chinook salmon, and downstream survival and arrival timing of natural and hatchery chinook salmon and steelhead. The hydrologic conditions that migrating fish encountered in 2001 were characterized as a drought and conditions in 2002 were characterized as below average. Hatchery chinook salmon had a mean fork length that was 34 mm greater in 2001 and 35 mm greater in 2002 than the mean fork length of natural chinook smolts. Hatchery steelhead smolt mean fork lengths were 39 mm greater than natural steelhead smolts in 2001 and 44 mm greater than natural steelhead smolt fork lengths in 2002. A significant difference (p < 0.05) between hatchery and natural chinook salmon and steelhead fork lengths has been documented by these emigration studies from 1997 to 2002. Hatchery chinook salmon were volitionally released in 2001 and 2002 and the 90% arrivals for 2001 and 2002 at the lower rkm 7 trap were within the range of past observations of 22 to 38 days observed in 1999 and 2000. We estimated that 93.9% of the 123,014 hatchery chinook salmon released in 2001 survived to the lower trap and 90.2% of the 303

  6. Evolution of strategic risks under future scenarios for improved utility master plans.

    Science.gov (United States)

    Luís, Ana; Lickorish, Fiona; Pollard, Simon

    2016-01-01

    Integrated, long-term risk management in the water sector is poorly developed. Whilst scenario planning has been applied to singular issues (e.g. climate change), it often misses a link to risk management because the likelihood of impacts in the long-term are frequently unaccounted for in these analyses. Here we apply the morphological approach to scenario development for a case study utility, Empresa Portuguesa das Águas Livres (EPAL). A baseline portfolio of strategic risks threatening the achievement of EPAL's corporate objectives was evolved through the lens of three future scenarios, 'water scarcity', 'financial resource scarcity' and 'strong economic growth', built on drivers such as climate, demographic, economic, regulatory and technological changes and validated through a set of expert workshops. The results represent how the baseline set of risks might develop over a 30 year period, allowing threats and opportunities to be identified and enabling strategies for master plans to be devised. We believe this to be the first combined use of risk and futures methods applied to a portfolio of strategic risks in the water utility sector. Copyright © 2015 Elsevier Ltd. All rights reserved.

  7. Source-Sink Estimates of Genetic Introgression Show Influence of Hatchery Strays on Wild Chum Salmon Populations in Prince William Sound, Alaska

    OpenAIRE

    Jasper, James R.; Habicht, Christopher; Moffitt, Steve; Brenner, Rich; Marsh, Jennifer; Lewis, Bert; Creelman Fox, Elisabeth; Grauvogel, Zac; Rogers Olive, Serena D.; Grant, W. Stewart

    2013-01-01

    The extent to which stray, hatchery-reared salmon affect wild populations is much debated. Although experiments show that artificial breeding and culture influence the genetics of hatchery salmon, little is known about the interaction between hatchery and wild salmon in a natural setting. Here, we estimated historical and contemporary genetic population structures of chum salmon (Oncorhynchus keta) in Prince William Sound (PWS), Alaska, with 135 single nucleotide polymorphism (SNP) markers. H...

  8. Activities and Ergonomics of Workers in Broiler Hatcheries

    Directory of Open Access Journals (Sweden)

    CCS Carvalho

    2015-06-01

    Full Text Available The objective this study was to assess ergonomic factors, posture and biomechanics of workers of a broiler egg hatchery. The analysis of ergonomic factors was based on physical work load, thermal environment, and exposure to light and noise. The posture of workers was analyzed using photographic records which were evaluated by the software program OWAS (Ovako Working Posture Analysing System. A biomechanics analysis was also performed based on the photographs taken of the employee at various angles, which were used as inputs to the Michigan two-dimensional biomechanical model software program. The results show that certain activities can be considered unhealthy due to the exposure of employees to physical and thermal overload. The continuous noise levels and lighting were outside the range considered adequate by the regulations of the Brazilian Ministry of Labor. The manner in which certain activities are carried out when associated with weight and poor posture can result in body lesions in broiler hatchery employees. It is therefore necessary to apply specific ergonomic programs, including scheduled breaks, training, and other measures in order to reduce or to eliminate the risks involved in these activities.

  9. Kokanee Stock Status and Contribution of Cabinet Gorge Hatchery, Lake Pend Oreille, Idaho, 1990 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Paragamian, Vaughn L.

    1991-03-01

    Rehabilitation of kokanee Oncorhynchus nerka in Lake Pend Oreille met with some success in 1990, but unexpected results have raised new questions. Estimated kokanee abundance during late August of 1990 was about 6.9 million fish. This is a decline of 19% from 1989, a continued decrease since 1988. The decreased population was attributed to low stocking of hatchery fry (7.3 million), lower wild fry survival in 1990 (1.5%), and exceptionally poor survival of fish ages 3+ and 4+. Average survival of the older fish was only 11% in 1990 compared to 72% in prior years. Compensatory survival was noted for kokanee ages 1+ and 2+, with an average of 81% in 1990 compared to 44% in 1989. Hatchery fry comprised 47% of the total kokanee fry recruitment in 1990 (80% of fry biomass). This contribution ranked third behind 1988 and 1989 since hatchery supplementation began in the 1970s. Survival of hatchery fry was 20%, the second highest since this investigation began. Findings of 1990 indicate a more comprehensive approach to managing kokanee must take into account predator stockings and predator/prey interaction. An unexpected low adult escapement was responsible for an egg-take of only 5.6 million eggs in 1990, 58% of the previous year, which will limit experimental stocking in 1991. Modification of the fish ladder at the Cabinet Gorge Fish Hatchery to improve adult escapement is strongly recommended to increase egg-take. 27 refs., 28 figs., 6 tabs.

  10. Energy-Integrating Master Plan for the City of Atlantic City, New Jersey: energy conservation element. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    1978-11-01

    The Master Plan describes a coordinated energy-conservation effort for the City, the effective application and ultimate success of which depend primarily on the active involvement of the City government and its functional departments. Following an introductory section, Section XXI, Community Energy Determinants, describes the natural and man-made environment, growth and energy profiles, and the institutional environment. Additional sections are entitled: Energy-Conservation Options (passive energy options and active energy-conservation options); Energy Integration; Community Energy Management; Energy-Conservation Implementation Plan; and an appendix containing an energy-related glossary, a directory to various sources of information on energy conservation, various technical documents, a copy of the National Energy Act, and a bibliography. (MCW)

  11. Momentum: "Developing Masterful Marketing Plans."

    Science.gov (United States)

    Meservey, Lynne D.

    1988-01-01

    Describes how directors can plan and develop a written marketing plan which can increase enrollment at child care centers. Components of successful marketing plans include parent retention; program merchandising; staff and director training; sales promotions; networking; and enrichment programs/fundraising. (NH)

  12. Mastering VMware vSphere 5

    CERN Document Server

    Lowe, Scott

    2011-01-01

    A new and updated edition of bestselling Mastering VMware vSphere 4 Written by leading VMware expert, this book covers all the features and capabilities of VMware vSphere. You'll learn how to install, configure, operate, manage, and secure the latest release.Covers all the new features and capabilities of the much-anticipated new release of VMware vSphereDiscusses the planning, installation, operation, and management for the latest releaseReviews migration to the latest vSphere softwareOffers hands-on instruction and clear explanations with real-world examples Mastering VMware vSphere is the

  13. Coeur d'Alene Tribe Fish, Water and Wildlife Program : Coeur d'Alene Tribe Trout Production Facility Master Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Peters, Ronald L.; Woodward-Lilengreen, Kelly L.; Vitale, Angelo J.

    1999-09-01

    The Northwest Power Planning Council (Council) receives and reviews proposals to mitigate for fish and wildlife losses and refers approved measures to Bonneville Power Administration (BPA) for funding. The Northwest Power Act (Act) calls on the Council to include measures in its Columbia River Basin Fish and Wildlife Program (Program) to address system-wide fish and wildlife losses. The Act further states that the Council may include in its Program measures that provide off-site mitigation--mitigation physically removed from the hydro project(s) that caused the need to mitigate. The Program includes a goal ''to recover and preserve the health of native resident fish injured by the hydropower system, where feasible, and, where appropriate, to use resident fish to mitigate for anadromous fish losses in the system.'' Among those recommended measures are off-site mitigation for losses of anadromous fisheries including the measure under analysis in this Coeur d'Alene Tribe Trout Production Facility Master Plan, proposed by the Coeur d'Alene Tribe. To meet the need for off-site mitigation for anadromous fish losses in the Columbia River Basin in a manner consistent with the objectives of the Council's Fish and Wildlife Program, the Coeur d'Alene Tribe is proposing that the BPA fund the design, construction, operations and maintenance of a trout production facility on the Coeur d'Alene Indian Reservation. Measures for establishing a Coeur d'Alene fish production facility have been a part of the Council's Program since 1987. The Coeur d'Alene Tribe Trout Production Facility is intended to rear and release westslope cutthroat trout into rivers and streams with the express purpose of increasing the numbers of fish spawning, incubating and rearing in the natural environment. It will use the modern technology that hatcheries offer to overcome the mortality resulting from habitat degradation in lakes, rivers, and

  14. Kokanee Stock Status and Contribution of Cabinet Gorge Hatchery, Lake Pend Oreille, Idaho, 1985 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bowles, Edward C.

    1986-07-01

    Mid-water trawling techniques were used during September to estimate kokanee population abundance, structure and survival. Abundance in 1985 was estimated at 4.5 million fish (198 per hectare), down from over 12 million kokanee in 1974 when the population was first monitored. Hatchery fry production (<6 million annually) has stabilized kokanee abundance since its initial decline in the late 1960s. Wild fry recruitment has remained relatively stable at 1.8 million since 1978; whereas recruitment of hatchery-reared fry has ranged from 0.09 to 1.98 million. The 1985 creel survey indicated that kokanee harvest rates remain low, with approximately one kokanee harvested per hour of effort from April to August. Catch rates were as high as 3.5 fish per hour during the mid-1960s. The zooplankton community was monitored with periodic plankton tows. Zooplankton composition in 1985 was similar to previous years and appears to have stabilized following the introduction of mysids, with peak cladoceran production occurring several weeks after peak kokanee emergence. Delayed release of hatchery fry resulted in higher survival of hatchery (7.3%) than wild (0.43%) kokanee fry. Other release strategies will be tested as more fry become available.

  15. Spring Chinook Salmon Oncorhynchus tshawytscha Supplementation in the Clearwater Subbasin ; Nez Perce Tribal Hatchery Monitoring and Evaluation Project, 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Backman, Thomas; Sprague, Sherman; Bretz, Justin [Nez Perce Tribe

    2009-06-10

    The Nez Perce Tribal Hatchery (NPTH) program has the following goals (BPA, et al., 1997): (1) Protect, mitigate, and enhance Clearwater Subbasin anadromous fish resources; (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater Subbasin; (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project initiation; (4) Sustain long-term fitness and genetic integrity of targeted fish populations; (5) Keep ecological and genetic impacts to non-target populations within acceptable limits; and (6) Promote Nez Perce Tribal management of Nez Perce Tribal Hatchery Facilities and production areas within Nez Perce Treaty lands. The NPTH program was designed to rear and release 1.4 million fall and 625,000 spring Chinook salmon. Construction of the central incubation and rearing facility NPTH and spring Chinook salmon acclimation facilities were completed in 2003 and the first full term NPTH releases occurred in 2004 (Brood Year 03). Monitoring and evaluation plans (Steward, 1996; Hesse and Cramer, 2000) were established to determine whether the Nez Perce Tribal Hatchery program is achieving its stated goals. The monitoring and evaluation action plan identifies the need for annual data collection and annual reporting. In addition, recurring 5-year program reviews will evaluate emerging trends and aid in the determination of the effectiveness of the NPTH program with recommendations to improve the program's implementation. This report covers the Migratory Year (MY) 2007 period of the NPTH Monitoring & Evaluation (M&E) program. There are three NPTH spring Chinook salmon treatment streams: Lolo Creek, Newsome Creek, and Meadow Creek. In 2007, Lolo Creek received 140,284 Brood Year (BY) 2006 acclimated pre-smolts at an average weight of 34.9 grams per fish, Newsome Creek received 77,317 BY 2006 acclimated pre-smolts at an average of 24

  16. Comparing the Reproductive Success of Yakima River Hatchery-and Wild-Origin Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schroder, S.L. (Washington Department of Fish and Wildlife, Olympia, WA); Knudsen, C.M. (Oncorh Consulting, Olympia, WA); Rau, J.A. (Cle Elum Supplementation Research, Cle Elum, WA)

    2003-01-01

    In the Yakima Spring Chinook supplementation program, wild fish are brought into the Cle Elum Hatchery, artificially crossed, reared, transferred to acclimation sites, and released into the upper Yakima River as smolts. When these fish mature and return to the Yakima River most of them will be allowed to spawn naturally; a few, however, will be brought back to the hatchery and used for research purposes. In order for this supplementation approach to be successful, hatchery-origin fish must be able to spawn and produce offspring under natural conditions. Recent investigations on salmonid fishes have indicated that exposure to hatchery environments during juvenile life may cause significant behavioral, physiological, and morphological changes in adult fish. These changes appear to reduce the reproductive competence of hatchery fish. In general, males are more affected than females; species with prolonged freshwater rearing periods are more strongly impacted than those with shorter rearing periods; and stocks that have been exposed to artificial culture for multiple generations are more impaired than those with a relatively short exposure history to hatchery conditions.

  17. On new methodological and other standards in planning: The case of the Master Plan of Belgrade 2021

    Directory of Open Access Journals (Sweden)

    Vujošević Miodrag L.

    2002-01-01

    changed structure of stakeholders and concomitant institutional arrangements. This also applies to 'educators' in general, because the prolonged international isolation of the FR Yugoslavia has caused the gross of their knowledge and capabilities irrelevant. In sum, it seems that many planners would not be able to assume new roles that they are expected to on the part of the society at large. (8The planning/policy information, research, institutional and other support provided by the state and other agents often does not satisfy even the most basic needs in this fields, partly for a general scarcity of resources concomitant to the overall and deep social, economic and political crisis the society found itself in the 1990s. (9 Most frightfully, manipulation, paternalism and clientelism still represent dominant forms of power, which is a problem by itself in Yugoslavia being one of the most corruptive countries in the world. What is now most missing is a non-manipulative persuasion, as well as the authority of professional values, as the communication and interaction forms that seem only promising for and supportive to developing of a democratic, emancipatory and transformative planning mode. A number of attempts during the last decade to embark upon the preparation of the new 'Master Plan of the City Belgrade' (in the sequel: MP came into realization not before the democratic political changes of October 2000 took place in Serbia. However, the so far undertaken steps do not seem promising, as they failed to satisfy a number of methodological and other standards, as well as to introduce necessary innovations. Unfortunately, the MP was commissioned to the Bureau of Urban Planning of the City of Belgrade (otherwise a 'faithful ally' of all non-democratic regimes in the City's urban planning and related matters over the last more than ten years now, during which there has been a so far unrecorded squandering and illegal privatization of public urban assets, mostly uncontrolled

  18. Spring outmigration of wild and hatchery chinook salmon and steelhead trout smolts from the Imnaha River, Oregon, February 23--June 24, 1996. Annual report 1996

    International Nuclear Information System (INIS)

    Blendon, M.L.; Rocklage, S.J.; Kucera, P.A.

    1997-04-01

    For the third consecutive year, the Nez Perce Tribe, in conjunction with the Fish Passage Center, participated in the smolt monitoring program in the Imnaha River. A rotary screw trap was used to collect emigrating wild and hatchery chinook salmon (Oncorhynchus tshawytscha) and steelhead trout (Oncorhynchus mykiss) smolts from February 23 to June 24, 1996. A total of 1,797 wild chinook salmon, 11,896 hatchery chinook salmon, 3,786 wild steelhead trout, and 31,094 hatchery steelhead trout smolts were captured during outmigration studies on the Imnaha River in 1996. Mortality associated with trapping, handling and tagging was low, being 1.4% for wild chinook, 0.18% for hatchery chinook, 0.21% for wild steelhead and 0.28% for hatchery steelhead trout smolts

  19. Expanding Nuclear Power Programmes - Romanian experience: Master - Nuclear Materials and Technologies Educational Plan

    International Nuclear Information System (INIS)

    Valeca, S.; Valeca, M.

    2012-01-01

    The main objectives of the Master Nuclear Materials and Technologies Educational Plan are: 1. To deliver higher education and training in the following specific domains, such as: Powders Technology and Ceramic Materials, Techniques of Structural Analysis, Composite Materials, Semiconductor Materials and Components, Metals and Metallic Alloys, Optoelectronic Materials and Devices, Nuclear Materials, The Engineering of Special Nuclear Materials, 2. To train managers of the Nuclear Waste Products and Nuclear Safety, 3. To qualify in ICT Systems for Nuclear Process Guidance, 4. To qualify in Environmental Protection System at the Level of Nuclear Power Stations, 5. To train managers for Quality Assurance of Nuclear Energetic Processes, 6. To deliver higher education and training regarding the International Treatises, Conventions and Settlements in force in the field of nuclear related activities. (author)

  20. Aspects of the reproductive biology of hatchery-raised Clarias ...

    African Journals Online (AJOL)

    The fecundity of four batch weights (10 samples each) of gravid Clarias gariepinus weighing 60 ± 0.17159 g 125 ± 0.15092 g 250 ±0.20683 g and 500 ± 0.15670 g raised from the hatchery was investigated The paired ovary of each fish was dissected out, weighed (g) and its length measured(mm). Each paired ovary was ...

  1. Implementing the enterprise master patient index.

    Science.gov (United States)

    Adragna, L

    1998-10-01

    In implementing a cross-facility initiative, the importance of planning and understanding the implications for all facilities can't be overlooked. Here's how one integrated delivery network navigated the challenges of implementing a cross-facility enterprise master patient index.

  2. Source-sink estimates of genetic introgression show influence of hatchery strays on wild chum salmon populations in Prince William Sound, Alaska.

    Directory of Open Access Journals (Sweden)

    James R Jasper

    Full Text Available The extent to which stray, hatchery-reared salmon affect wild populations is much debated. Although experiments show that artificial breeding and culture influence the genetics of hatchery salmon, little is known about the interaction between hatchery and wild salmon in a natural setting. Here, we estimated historical and contemporary genetic population structures of chum salmon (Oncorhynchus keta in Prince William Sound (PWS, Alaska, with 135 single nucleotide polymorphism (SNP markers. Historical population structure was inferred from the analysis of DNA from fish scales, which had been archived since the late 1960's for several populations in PWS. Parallel analyses with microsatellites and a test based on Hardy-Weinberg proportions showed that about 50% of the fish-scale DNA was cross-contaminated with DNA from other fish. These samples were removed from the analysis. We used a novel application of the classical source-sink model to compare SNP allele frequencies in these archived fish-scales (1964-1982 with frequencies in contemporary samples (2008-2010 and found a temporal shift toward hatchery allele frequencies in some wild populations. Other populations showed markedly less introgression, despite moderate amounts of hatchery straying. The extent of introgression may reflect similarities in spawning time and life-history traits between hatchery and wild fish, or the degree that hybrids return to a natal spawning area. The source-sink model is a powerful means of detecting low levels of introgression over several generations.

  3. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    Full Text Available Since the 1980s China has experienced unprecedented urbanisation as a result of a series of reforms promoting rapid economic development. Shanghai, like the other big cities along China’s coastline, has witnessed extraordinary growth in its economy and population with industrial development and rural-to-urban migration generating extensive urban expansion. Shanghai’s GDP growth rate has been over 10 per cent for more than 15 years. Its population in 2013 was estimated at 23.47 million, which is double its size in 1979. The urban area enlarged by four times from 644 to 2,860 km2 between 1977 and 2010. Such demanding growth and dramatic changes present big challenges for urban planning practice in Shanghai. Plans have not kept up with development and the mismatch between the proposals in plans and the actual spatial development has gradually increased, reaching a critical level since 2000. The mismatch in the periurban areas is more notable than that in the existing urban area, but there has not been a systematic review of the relationship between plan and implementation. Indeed, there are few studies on the evaluation of plan implementation in China generally. Although many plans at numerous spatial levels are successively prepared and revised, only few of them have been evaluated in terms of their effectiveness and implementation.  This particularly demanding context for planning where spatial development becomes increasingly unpredictable and more difficult to influence presents an opportunity to investigate the role of plans under conditions of rapid urbanisation. The research project asks to what extent have spatial plans influenced the actual spatial development in the peri-urban areas of Shanghai? The research pays particular attention to the role of the Shanghai Master Plan 1999-2020 (Plan 1999. By answering the main research question this study seeks to contribute to a better understanding of present planning practice in Shanghai

  4. Sherman Creek Hatchery; Washington Department of Fish and Wildlife Fish Program, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Combs, Mitch (Washington Department of Fish and Wildlife, Kettle Falls, WA)

    2001-03-01

    The Sherman Creek Hatchery (SCH) was designed to rear 1.7 million kokanee fry for acclimation and imprinting during the spring and early summer. Additionally, it was designed to trap all available returning adult kokanee during the fall for broodstock operations and evaluations. Since the start of this program, the operations on Lake Roosevelt have been modified to better achieve program goals. These strategic changes have been the result of recommendations through the Lake Roosevelt Hatcheries Coordination Team (LRHCT) and were done to enhance imprinting, improve survival and operate the two kokanee facilities more effectively. The primary changes have been to replace the kokanee fingerling program with a yearling (post smolt) program of up to 1,000,000 fish. To construct and operate twenty net pens to handle the increased production. The second significant change was to rear 200,000 rainbow trout fingerling at SCH from July through October, for stocking into the volunteer net pens. This enables the Spokane Tribal Hatchery (STH) to rear additional kokanee to further the enhancement efforts on Lake Roosevelt. Monitoring and evaluation is preformed by the Lake Roosevelt Fisheries Monitoring Program. From 1988 to 1998, the principle sport fishery on Lake Roosevelt has shifted from walleye to include rainbow trout and kokanee salmon (Underwood et al. 1997, Tilson and Scholz 1997). The angler use, harvest rates for rainbow and kokanee and the economic value of the fishery has increased substantially during this 10-year period. The most recent information from the monitoring program also suggests that the hatchery and net pen rearing programs have been beneficial to enhancing the Lake Roosevelt fishery while not negatively impacting wild and native stocks within the lake.

  5. Effect of oxygen supplementation in a hatchery at high altitude and ...

    African Journals Online (AJOL)

    PCRT

    2014-11-19

    Nov 19, 2014 ... South African Journal of Animal Science 2014, 44 (No. 4) .... with a Biolabo Reagents diagnostic kit (Biolabo Sa, Maizy, France) according to the manufacturer's ..... This study was supported financially by the Scientific Research Project Council of ... Ascites control through proper hatchery management.

  6. Spring outmigration of wild and hatchery chinook salmon and steelhead trout smolts from the Imnaha River, Oregon, February 23--June 24, 1996. Annual report 1996; ANNUAL

    International Nuclear Information System (INIS)

    Blendon, M.L.; Rocklage, S.J.; Kucera, P.A.

    1997-01-01

    For the third consecutive year, the Nez Perce Tribe, in conjunction with the Fish Passage Center, participated in the smolt monitoring program in the Imnaha River. A rotary screw trap was used to collect emigrating wild and hatchery chinook salmon (Oncorhynchus tshawytscha) and steelhead trout (Oncorhynchus mykiss) smolts from February 23 to June 24, 1996. A total of 1,797 wild chinook salmon, 11,896 hatchery chinook salmon, 3,786 wild steelhead trout, and 31,094 hatchery steelhead trout smolts were captured during outmigration studies on the Imnaha River in 1996. Mortality associated with trapping, handling and tagging was low, being 1.4% for wild chinook, 0.18% for hatchery chinook, 0.21% for wild steelhead and 0.28% for hatchery steelhead trout smolts

  7. An Enriched Environment Promotes Shelter-Seeking Behaviour and Survival of Hatchery-Produced Juvenile European Lobster (Homarus gammarus)

    Science.gov (United States)

    Aspaas, Stian; Grefsrud, Ellen Sofie; Fernö, Anders; Jensen, Knut Helge; Trengereid, Henrik; Agnalt, Ann-Lisbeth

    2016-01-01

    The high loss of newly released hatchery-reared European lobster (Homarus gammarus) juveniles for stock enhancement is believed to be the result of maladaptive anti-predator behaviour connected to deprived stimuli in the hatchery environment. Our objective was to learn if an enriched hatchery environment enhances shelter-seeking behaviour and survival. In the “naïve” treatment, the juveniles were raised in single compartments without substrate and shelter whereas juveniles in the “exposed” treatment experienced substrate, shelter and interactions with conspecifics. Three experiments with increasing complexity were conducted. Few differences in shelter-seeking behaviour were found between treatments when one naïve or one exposed juvenile were observed alone. When observing interactions between one naïve and one exposed juvenile competing for shelter, naïve juveniles more often initiated the first aggressive encounter. The third experiment was set up to simulate a release for stock enhancement. Naïve and exposed juveniles were introduced to a semi-natural environment including substrate, a limited number of shelters and interactions with conspecifics. Shelter occupancy was recorded three times during a period of 35 days. Exposed juveniles occupied more shelters, grew larger and had higher survival compared with naïve juveniles. Our results demonstrate that experience of environmental complexity and social interactions increase shelter-seeking ability and survival in hatchery reared lobster juveniles. PMID:27560932

  8. An Enriched Environment Promotes Shelter-Seeking Behaviour and Survival of Hatchery-Produced Juvenile European Lobster (Homarus gammarus).

    Science.gov (United States)

    Aspaas, Stian; Grefsrud, Ellen Sofie; Fernö, Anders; Jensen, Knut Helge; Trengereid, Henrik; Agnalt, Ann-Lisbeth

    2016-01-01

    The high loss of newly released hatchery-reared European lobster (Homarus gammarus) juveniles for stock enhancement is believed to be the result of maladaptive anti-predator behaviour connected to deprived stimuli in the hatchery environment. Our objective was to learn if an enriched hatchery environment enhances shelter-seeking behaviour and survival. In the "naïve" treatment, the juveniles were raised in single compartments without substrate and shelter whereas juveniles in the "exposed" treatment experienced substrate, shelter and interactions with conspecifics. Three experiments with increasing complexity were conducted. Few differences in shelter-seeking behaviour were found between treatments when one naïve or one exposed juvenile were observed alone. When observing interactions between one naïve and one exposed juvenile competing for shelter, naïve juveniles more often initiated the first aggressive encounter. The third experiment was set up to simulate a release for stock enhancement. Naïve and exposed juveniles were introduced to a semi-natural environment including substrate, a limited number of shelters and interactions with conspecifics. Shelter occupancy was recorded three times during a period of 35 days. Exposed juveniles occupied more shelters, grew larger and had higher survival compared with naïve juveniles. Our results demonstrate that experience of environmental complexity and social interactions increase shelter-seeking ability and survival in hatchery reared lobster juveniles.

  9. Comparison of the riverine and early marine migration behaviour and survival of wild and hatchery-reared sea trout Salmo trutta smolts

    DEFF Research Database (Denmark)

    Aarestrup, Kim; Baktoft, Henrik; Koed, Anders

    2014-01-01

    listening stations (ALS) at four locations in the river and fjord. Migration speeds were approximately three to eleven times faster in the river than in the early marine environment. Hatchery-reared smolts migrated faster than wild smolts, but the difference was small, especially compared to the large...... of the wild smolts was 1.8 and 2.9 times higher than that of the hatchery-reared smolts in the two study years, respectively, from release in the river to the outermost marine ALS site, 46 km from the release site. Overall, survival from release to the outermost ALS site was 79% for wild and 39% for hatchery......The seaward migration of wild (n = 61) and hatchery-reared (n = 46) sea trout smolts was investigated in the Danish River Gudenaa and Randers Fjord (17.3 and 28.6 km stretch, respectively) using acoustic telemetry. Their riverine and early marine migration was monitored by deploying automatic...

  10. Network master planning for a global manufacturing company

    OpenAIRE

    Heinz, Michael Pierre

    2006-01-01

    Production in global, intra-organisational networks is becoming more common. In this context, the allocation of production quantities to constrained manufacturing capacity is a challenging process. Due to a volatile environment it is argued to be impossible to achieve a ‘clean’ system design with dedicated resources which exactly meets future demand. Thus, recursive ‘Network Master Planning’ (NMP) becomes necessary. The aim of this research is to generate an understanding of th...

  11. Hatchery mortalities of larval oysters caused by Vibrio tubiashii and Vibrio coralliilyticus

    Science.gov (United States)

    Hatchery production of bivalve shellfish has been hampered by the occasional presence of opportunistic pathogens, particularly Vibrio coralliilyticus and Vibrio tubiashii. The present study reports the results of several avenues of research to better define these pathogens and the roles they play i...

  12. Umatilla Basin Natural Production Monitoring and Evaluation; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, Jesse D.M.; Contor, Craig C.; Hoverson, Eric (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2005-10-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). UBNPMEP is coordinated with two ODFW research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. Our project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 19000500, Umatilla Hatchery M & E) and smolt outmigration (project No. 198902401, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects comprehensively monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. Table 1 outlines relationships with other BPA supported projects. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan (ODFW and CTUIR 2004), the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (Schwartz & Cameron Under Revision). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPPC 2004). The need for monitoring the natural production of salmonids in the Umatilla River

  13. Early enrichment effects on brain development in hatchery-reared Atlantic salmon (Salmo salar): no evidence for a critical period

    DEFF Research Database (Denmark)

    Näslund, Joacim; Aarestrup, Kim; Thomassen, Søren T.

    2012-01-01

    was released into nature and recaptured at smoltification. These stream-reared smolts developed smaller brains than the hatchery reared smolts, irrespective of initial enrichment treatment. These novel findings do not support the hypothesis that there is a critical early period determining the brain growth...... trajectory. In contrast, our results indicate that brain growth is plastic in relation to environment. In addition, we show allometric growth in brain substructures over juvenile development, which suggests that comparisons between groups of different body size should be made with caution. These results can......In hatcheries, fish are normally reared in barren environments, which have been reported to affect their phenotypic development compared with wild conspecifics. In this study, Atlantic salmon (Salmo salar) alevins were reared in conventional barren hatchery trays or in either of two types...

  14. Natural Reproductive Success and Demographic Effects of Hatchery-Origin Steelhead in Abernathy Creek, Washington : Annual Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Fish & Wildlife Service, Abernathy Fish Technology Center

    2008-12-01

    Many hatchery programs for steelhead pose genetic or ecological risks to natural populations because those programs release or outplant fish from non-native stocks. The goal of many steelhead programs has been to simply provide 'fishing opportunities' with little consideration given to conservation concerns. For example, the Washington Department of Fish and Wildlife (WDFW) has widely propagated and outplanted one stock of winter-run steelhead (Chambers Creek stock) and one stock of summer-run steelhead (Skamania stock) throughout western Washington. Biologists and managers now recognize potential negative effects can occur when non-native hatchery fish interact biologically with native populations. Not only do non-native stocks pose genetic and ecological risks to naturally spawning populations, but non-native fish stray as returning adults at a much higher rate than do native fish (Quinn 1993). Biologists and managers also recognize the need to (a) maintain the genetic resources associated with naturally spawning populations and (b) restore or recover natural populations wherever possible. As a consequence, the U.S. Fish & Wildlife Service (USFWS) and the NOAA Fisheries have been recommending a general policy that discourages the use of non-native hatchery stocks and encourages development of native broodstocks. There are two primary motivations for these recommendations: (1) reduce or minimize potential negative biological effects resulting from genetic or ecological interactions between hatchery-origin and native-origin fish and (2) use native broodstocks as genetic repositories to potentially assist with recovery of naturally spawning populations. A major motivation for the captive-rearing work described in this report resulted from NOAA's 1998 Biological Opinion on Artificial Propagation in the Columbia River Basin. In that biological opinion (BO), NOAA concluded that non-native hatchery stocks of steelhead jeopardize the continued existence of

  15. Hood River and Pelton Ladder Evaluation Studies, 2008 Annual Report : October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Reagan, Robert E.; Olsen, Erik A. [Oregon Department of Fish and Wildlife

    2009-09-28

    This report summarizes the life history and production data collected in the Hood River subbasin during FY 2008. Included is a summary of jack and adult life history data collected at the Powerdale Dam trap on seventeen complete run years of winter steelhead, spring and fall chinook salmon, and coho salmon, and on fifteen complete run years of summer steelhead. Also included are summaries of (1) the hatchery winter steelhead broodstock collection program; (2) hatchery production releases in the Hood River subbasin; (3) subbasin wild summer and winter steelhead smolt production, (4) numbers of hatchery summer and winter steelhead smolts leaving the subbasin; (5) smolt migration timing past Bonneville Dam, (6) wild and hatchery steelhead smolt-to-adult survival rates; (7) wild summer and winter steelhead egg to smolt survival rates; and (8) streamflow at selected locations in the Hood River subbasin. Data will be used in part to (1) evaluate the HRPP relative to its impact on indigenous populations of resident and anadromous salmonids (see Ardren Draft), (2) evaluate the HRPP's progress towards achieving the biological fish objectives defined in the Hood River Subbasin Plan (Coccoli 2004) and the Revised Master Plan for the Hood River Production Program (HDR|FishPro, ODFW, and CTWSRO 2008), (3) refine spawner escapement objectives to more accurately reflect subbasin carrying capacity, and (4) refine estimates of subbasin smolt production capacity to more accurately reflect current and potential subbasin carrying capacity.

  16. Innovative Stormwater Quality Tools by SARA for Holistic Watershed Master Planning

    Science.gov (United States)

    Thomas, S. M.; Su, Y. C.; Hummel, P. R.

    2016-12-01

    Stormwater management strategies such as Best Management Practices (BMP) and Low-Impact Development (LID) have increasingly gained attention in urban runoff control, becoming vital to holistic watershed master plans. These strategies can help address existing water quality impairments and support regulatory compliance, as well as guide planning and management of future development when substantial population growth and urbanization is projected to occur. However, past efforts have been limited to qualitative planning due to the lack of suitable tools to conduct quantitative assessment. The San Antonio River Authority (SARA), with the assistance of Lockwood, Andrews & Newnam, Inc. (LAN) and AQUA TERRA Consultants (a division of RESPEC), developed comprehensive hydrodynamic and water quality models using the Hydrological Simulation Program-FORTRAN (HSPF) for several urban watersheds in the San Antonio River Basin. These models enabled watershed management to look at water quality issues on a more refined temporal and spatial scale than the limited monitoring data. They also provided a means to locate and quantify potential water quality impairments and evaluate the effects of mitigation measures. To support the models, a suite of software tools were developed. including: 1) SARA Timeseries Utility Tool for managing and processing of large model timeseries files, 2) SARA Load Reduction Tool to determine load reductions needed to achieve screening levels for each modeled constituent on a sub-basin basis, and 3) SARA Enhanced BMP Tool to determine the optimal combination of BMP types and units needed to achieve the required load reductions. Using these SARA models and tools, water quality agencies and stormwater professionals can determine the optimal combinations of BMP/LID to accomplish their goals and save substantial stormwater infrastructure and management costs. The tools can also help regulators and permittees evaluate the feasibility of achieving compliance

  17. PNNL Campus Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, Whitney LC

    2012-09-07

    The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

  18. Action of Antimicrobial Copper on Bacteria and Fungi Isolated from Commercial Poultry Hatcheries

    Directory of Open Access Journals (Sweden)

    RFR Depner

    Full Text Available ABSTRACT Since 2008, when the US Environmental Protection Agency (EPA registered copper and its alloys as an antimicrobial agent for contact surfaces, research has demonstrated their antimicrobial activity. The aim of this study was to evaluate the efficacy of antimicrobial copper against bacteria and fungi isolated from commercial poultry hatcheries in order to develop a microbiological control alternative in these environments. Samples were collected from the surfaces of hatcher baskets from two hatcheries. Mesophilic microorganisms and fungi/yeasts were isolated and standardized in concentration of 105 cells/mL. Four copper plates and four stainless steel plates were completely immersed for one minute in bacteria and fungi/yeasts solutions and left to dry for a day at room temperature. Subsequently, samples were collected from the metal plates with the aid of sterile swab and delimiter. These samples were planted onto Plate Count Agar (for mesophilic culture and Sabouraud Dextrose Agar (for fungi and yeast culture and incubated at 36°C for 48 hours and at 25°C for 5-7 days, respectively. After incubation, the colonies recovered from the plates were counted according to IN 62 of the Brazilian Ministry of Agriculture. Almost all contamination was eliminated from the surface of copper plates in a single day, while the stainless steel plates proved to be innocuous to the screened microorganisms. Copper, as a contact surface, proved to have important antimicrobial action on bacteria, fungi and yeasts common to hatcheries.

  19. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Knudsen, Curtis M. (Oncorh Consulting, Olympia, WA); Schroder, Steven L. (Washington Department of Fish and Wildlife, Olympia, WA); Johnston, Mark V. (yakama Nation, Toppenish, WA)

    2005-05-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from Oncorh Consulting to the Washington Department of Fish and Wildlife (WDFW), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning and (2) summarize results of research that have broader scientific relevance. This is the fourth in a series of reports that address reproductive ecological research and monitoring of spring chinook populations in the Yakima River basin. This annual report summarizes data collected between April 1, 2004 and March 31, 2005 and includes analyses of historical baseline data, as well. Supplementation success in the Yakima Klickitat Fishery Project's (YKFP) spring chinook (Oncorhynchus tshawytscha) program is defined as increasing natural production and harvest opportunities, while keeping adverse ecological interactions and genetic impacts within acceptable bounds (Busack et al. 1997). Within this context demographics, phenotypic traits, and reproductive ecology have significance because they directly affect natural productivity. In addition, significant changes in locally adapted traits due to hatchery influence, i.e. domestication, would likely be maladaptive resulting in reduced population productivity and fitness (Taylor 1991; Hard 1995). Thus, there is a need to study demographic and phenotypic traits in the YKFP in order to understand hatchery and wild population productivity, reproductive ecology, and the effects of domestication (Busack et al. 1997). Tracking trends in these traits over time is also a critical aspect of domestication monitoring (Busack et al. 2004) to determine whether trait changes have a genetic component and, if so, are they within acceptable limits. The first chapter of this report compares first generation hatchery and wild upper Yakima River spring chinook returns over a suite of life-history, phenotypic and demographic traits. The second

  20. Predation on hatchery-reared lobsters released in the wild

    OpenAIRE

    van der Meeren, Gro

    2000-01-01

    Predation on hatchery-reared lobsters (Homarus gammarus) in the wild was studied in order to identify predators in southwestern Norway on rocky and sandy substrates in winter and summer. Lobsters of 12–15 mm carapace length were tagged with magnetic microtags. About 51 000 juvenile lobsters were released on 10 occasions at three locations. Predator samplings were by trammel nets, eel traps, and videorecordings during the 24 h immediately following the releases. In summer, loss to ...

  1. Occurrence of viral pathogens in Penaeus monodon post-larvae from aquaculture hatcheries

    Directory of Open Access Journals (Sweden)

    Toms C. Joseph

    2015-09-01

    Full Text Available Viral pathogens appear to exert the most significant constraints on the growth and survival of crustaceans under culture conditions. The prevalence of viral pathogens White Spot Syndrome Virus (WSSV, Hepatopancreatic Parvo Virus (HPV, Monodon Baculo Virus (MBV and Infectious Hypodermal and Hematopoietic Necrosis Virus (IHHNV in Penaeus monodon post-larvae was studied. Samples collected from different hatcheries and also samples submitted by farmers from Kerala were analyzed. Out of 104 samples collected, WSSV was detected in 12.5% of the post-larvae samples. Prevalence of concurrent infections by HPV, MBV and WSSV (either dual or triple infection was present in 60.6% of the total post-larvae tested. Out of the 51 double positives, 98% showed either HPV or IHHNV infection. HPV or IHHNV was detected in 11 post-larval samples showing triple viral infection. This is the first report of IHHNV from India. Result of this study reveals the lack of efficient screening strategies to eradicate viruses in hatchery reared post-larvae.

  2. Extended-Spectrum-Beta-Lactamase- and Plasmid-Encoded Cephamycinase-Producing Enterobacteria in the Broiler Hatchery as a Potential Mode of Pseudo-Vertical Transmission.

    Science.gov (United States)

    Projahn, Michaela; Daehre, Katrin; Roesler, Uwe; Friese, Anika

    2017-01-01

    Antimicrobial resistance through extended-spectrum beta-lactamases (ESBLs) and transferable (plasmid-encoded) cephamycinases (pAmpCs) represents an increasing problem in human and veterinary medicine. The presence of ESBL-/pAmpC-producing commensal enterobacteria in farm animals, such as broiler chickens, is considered one possible source of food contamination and could therefore also be relevant for human colonization. Studies on transmission routes along the broiler production chain showed that 1-day-old hatchlings are already affected. In this study, ESBL-/pAmpC-positive broiler parent flocks and their corresponding eggs, as well as various environmental and air samples from the hatchery, were analyzed. The eggs were investigated concerning ESBL-/pAmpC-producing enterobacteria on the outer eggshell surface (before/after disinfection), the inner eggshell surface, and the egg content. Isolates were analyzed concerning their species, their phylogroup in the case of Escherichia coli strains, the respective resistance genes, and the phenotypical antibiotic resistance. Of the tested eggs, 0.9% (n = 560) were contaminated on their outer shell surface. Further analyses using pulsed-field gel electrophoresis showed a relationship of these strains to those isolated from the corresponding parent flocks, which demonstrates a pseudo-vertical transfer of ESBL-/pAmpC-producing enterobacteria into the hatchery. Resistant enterobacteria were also found in environmental samples from the hatchery, such as dust or surfaces which could pose as a possible contamination source for the hatchlings. All 1-day-old chicks tested negative directly after hatching. The results show a possible entry of ESBL-/pAmpC-producing enterobacteria from the parent flocks into the hatchery; however, the impact of the hatchery on colonization of the hatchlings seems to be low. ESBL-/pAmpC-producing enterobacteria occur frequently in broiler-fattening farms. Recent studies investigated the prevalence and

  3. Family size and effective population size in a hatchery stock of coho salmon (Oncorhynchus kisutch)

    Science.gov (United States)

    Simon, R.C.; McIntyre, J.D.; Hemmingsen, A.R.

    1986-01-01

    Means and variances of family size measured in five year-classes of wire-tagged coho salmon (Oncorhynchus kisutch) were linearly related. Population effective size was calculated by using estimated means and variances of family size in a 25-yr data set. Although numbers of age 3 adults returning to the hatchery appeared to be large enough to avoid inbreeding problems (the 25-yr mean exceeded 4500), the numbers actually contributing to the hatchery production may be too low. Several strategies are proposed to correct the problem perceived. Argument is given to support the contention that the problem of effective size is fairly general and is not confined to the present study population.

  4. Production of giant freshwater prawn postlarvae in penaeid prawn (shrimp) hatchery: An experience

    Digital Repository Service at National Institute of Oceanography (India)

    Achuthankutty, C.T.; Chatterji, A.; Sripada, R.A.; Desai, U.M.

    A pilot scale penaeid prawn (shrimp) hatchery was established at the National Institute of Oceanography, Goa, India in 1996 with an installed production capacity of 2 million postlarvae (PL 20) as part of the Technology Project in Mission Mode Semi...

  5. Management of bacterial kidney disease in Chinook Salmon hatcheries based on broodstock testing by enzyme-linked immunosorbent assay: A multiyear study

    Science.gov (United States)

    Munson, A. Douglas; Elliott, Diane G.; Johnson, Keith

    2010-01-01

    From the mid-1980s through the early 1990s, outbreaks of bacterial kidney disease (BKD) caused by Renibacterium salmoninarum continued in Chinook salmon Oncorhynchus tshawytscha in Idaho Department of Fish and Game (IDFG) hatcheries despite the use of three control methods: (1) injection of returning adult fish with erythromycin to reduce prespawning BKD mortality and limit vertical transmission of R. salmoninarum, (2) topical disinfection of green eggs with iodophor, and (3) prophylactic treatments of juvenile fish with erythromycin-medicated feed. In addition, programs to manage BKD through measurement of R. salmoninarum antigen levels in kidney tissues from spawning female Chinook salmon by an enzyme-linked immunosorbent assay (ELISA) were tested over 13–15 brood years at three IDFG hatcheries. The ELISA results were used for either (1) segregated rearing of progeny from females with high ELISA optical density (OD) values (usually ≥0.25), which are indicative of high R. salmoninarum antigen levels, or (2) culling of eggs from females with high ELISA OD values. The ELISA-based culling program had the most profound positive effects on the study populations. Mortality of juvenile fish during rearing was significantly lower at each hatchery for brood years derived from culling compared with brood years for which culling was not practiced. The prevalence of R. salmoninarum in juvenile fish, as evidenced by detection of the bacterium in kidney smears by the direct fluorescent antibody test, also decreased significantly at each hatchery. In addition, the proportions of returning adult females with kidney ELISA OD values of 0.25 or more decreased 56–85% for fish reared in brood years during which culling was practiced, whereas the proportions of ELISA-negative adults increased 55–58%. This management strategy may allow IDFG Chinook salmon hatcheries to reduce or eliminate prophylactic erythromycin-medicated feed treatments. We recommend using ELISA

  6. Environment-dependent plasticity and ontogenetic changes in the brain of hatchery-reared Atlantic salmon

    DEFF Research Database (Denmark)

    Näslund, J.; Larsen, Martin Hage; Thomassen, S.T.

    2017-01-01

    enhancement strategies, like environmental enrichment. Here, we investigated the size of the brain in hatcheryreared Atlantic salmon Salmo salar kept at standard (high) and reduced (low) tank densities. In contrast to our predictions, we found that fish reared at high density had larger dry mass of cerebellum...... and telencephalon, correcting for body size. No differences were detected for total brain mass. Furthermore, we found that the relative size of both telencephalon and cerebellum, in relation to total brain mass, changed with body size. Cerebellum increased in relative size with increased body size, while......Lowered rearing density has repeatedly been shown to increase the performance of hatchery-reared salmonids stocked into natural environments. One possible mechanism for this pattern could be that lower densities enhance brain development, which has been shown to be the case in other hatchery...

  7. Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kline, Paul A.; Heindel, Jeff A.; Willard, Catherine (Idaho Department of Fish and Game, Boise, ID)

    2003-08-01

    On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Marine Fisheries Service at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Marine Fisheries Service are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases (annual report to the Bonneville Power Administration for the research element of the program) are also reported under separate cover. Captive broodstock program activities conducted between January 1, 1997 and December 31, 1997 are presented in this report. One hundred twenty-six female sockeye salmon from one captive broodstock group were spawned at the Eagle Fish Hatchery in 1997. Successful spawn pairings produced approximately 148,781 eyed-eggs with a cumulative mean survival to eyed-egg rate of 57.3%. Approximately 361,600 sockeye salmon were released to Sawtooth basin waters in 1997. Reintroduction strategies included eyed-eggs (brood year 1997), presmolts (brood year 1996), and prespawn adults for volitional spawning (brood year 1994). Release locations included Redfish Lake, Alturas Lake, and Pettit Lake. During this reporting period, four broodstocks and two unique production groups were in culture at the Eagle Fish Hatchery. Two of the four broodstocks were incorporated into the 1997 spawning design, and one broodstock was terminated following

  8. A comparison of the survival and migration of wild and F1-hatchery-reared brown trout (Salmo trutta) smolts traversing an artificial lake

    DEFF Research Database (Denmark)

    Schwinn, Michael; Baktoft, Henrik; Aarestrup, Kim

    2017-01-01

    rates from the sea of wild and 1-year old F1-hatchery-reared brown trout smolts in a Danish lowland stream that contains an artificial lake using passive integrated transponder telemetry in the years 2011–2013 and 2016. The majority of hatchery-reared smolts descended within 72 h after their release...

  9. Hatchery tank enrichment affects cortisol levels and shelter-seeking in Atlantic salmon (Salmo salar)

    DEFF Research Database (Denmark)

    Näslund, Joacim; Rosengren, Malin; Del Villar, Diego

    2013-01-01

    Stocking programs using hatchery-reared salmon are often implemented for augmenting natural populations. However, survival of these fish is often low compared with wild conspecifics, possibly because of genetic, physiological, and behavioural deficiencies. Here, we compared presmolt Atlantic salm...

  10. 14 CFR 152.109 - Project eligibility: Airport planning.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project eligibility: Airport planning. 152....109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport master planning is not approved unless— (1) The location of the existing or proposed airport is included...

  11. Phytoplankton production systems in a shellfish hatchery: variations of the bacterial load and diversity of vibrios.

    Science.gov (United States)

    Dubert, J; Fernández-Pardo, A; Nóvoa, S; Barja, J L; Prado, S

    2015-06-01

    Outbreaks of disease caused by some Vibrio species represent the main production bottleneck in shellfish hatcheries. Although the phytoplankton used as food is one of the main sources of bacteria, studies of the associated bacterial populations, specifically vibrios, are scarce. The aim of the study was the microbiological monitoring of the microalgae as the first step in assessing the risk disease for bivalve cultures. Two phytoplankton production systems were sampled weekly throughout 1-year period in a bivalve hatchery. Quantitative analysis revealed high levels of marine heterotrophic bacteria in both systems throughout the study. Presumptive vibrios were detected occasionally and at low concentrations. In most of the cases, they belonged to the Splendidus and Harveyi clades. The early detection of vibrios in the microalgae may be the key for a successful bivalve culture. Their abundance and diversity were affected by factors related to the hatchery environment. This work represents the first long study where the presence of vibrios was evaluated rigorously in phytoplankton production systems and provides a suitable microbiological protocol to control and guarantee the quality of the algal cultures to avoid the risk of transferring potential pathogens to shellfish larvae and/or broodstock. © 2015 The Society for Applied Microbiology.

  12. Formulation for less master production schedule instability under rolling horizon

    OpenAIRE

    Herrera , Carlos; Thomas , André

    2009-01-01

    International audience; In Manufacturing Planning and Control Systems, the Master Production Schedule (MPS) makes a link between tactical and operational levels, taking into account information provided by end items, demand forecast as well as Sales and Operations Planning (S&OP) suggestions. Therefore, MPS plays an important role to maintain an adequate customers service level and an efficient production system. In a rolling planning horizon, MPS is periodically computed over whole operation...

  13. Use of copper sulfate to control Saprolegniasis at a commercial sunshine bass hatchery

    Science.gov (United States)

    An obstacle to sunshine bass (female white bass Morone chrysops × male striped bass M. saxatilis) larval production is fungal growth on eggs caused by the water-mold Saprolegnia spp. Copper sulfate (CuSO4) is commonly used for fungus control in troughs of catfish hatcheries, but the effectiveness o...

  14. Erosion of interspecific reproductive barriers resulting from hatchery supplementation of rainbow trout sympatric with cutthroat trout.

    Science.gov (United States)

    Docker, Margaret F; Dale, Angie; Heath, Daniel D

    2003-12-01

    The frequency of hybridization between cutthroat (Onchorhynchus clarki clarki) and rainbow (O. mykiss irideus) trout from coastal habitats in British Columbia, Canada, was examined in seven populations where the two species are sympatric with no history of rainbow trout stocking and compared with areas where native rainbow trout populations have been supplemented with hatchery fish (three populations). Four nuclear markers were used to identify each species and interspecific hybrids and one mitochondrial marker showed the direction of gene exchange between species. The frequency of hybrids was significantly higher (Fisher exact test, P < 0.001) in river systems where hatchery rainbow trout have been introduced (50.6% hybrids) than in populations where the two species naturally co-occur without supplementation (9.9% hybrids).

  15. Establishment and Efficiency Evaluation of a Simple Mini hatchery for production of Oreochromis niloticus (GIFT strain seeds

    Directory of Open Access Journals (Sweden)

    M.P.K.S.K. De Silva

    2015-06-01

    Full Text Available A simple technology mini hatchery was established for small scale farmers to meet their own GIFT seed requirements. Different shapes and sizes of jars were trialed for incubation of eggs and yolk-sac larvae. Concaved bottom round plastic bottles (4 L and rectangular (3 L plastic trays gave the best hatchability of eggs and survival of yolk-sac larvae respectively. The best stocking density was 500 eggs/larvae L-1. Optimised flow rate into the incubation bottles and rearing trays were 2.70±0.18 L min-1 and 5.40±0.14 L min-1 respectively. Two gravel filters (15 L and 20 L made with discarded and low cost material purified the water from the incubation containers and directed into a water recirculation system. Production efficiency of this mini hatchery was compared with a hapa breeding method. Two hapas having 10 m3 size and 1.6 mm mesh were positioned in an earthen pond. Each hapa was stocked with 40 GIFT broodfish at 1:1 female to male ratio. In Phase I of the study (60 days, eggs collected from Hapa I were placed in incubation bottles and hatchability and survival rate were determined. In parallel, free-swimming fry were collected and counted from the Hapa II at every 14 days. The study continued in the same way for Phase II (next 60 days by interchanging the brood fish between Hapa I and Hapa II. Yield from the mini hatchery (24,000 fry was significantly different (P≤0.05 from hapa method (4,879 fry indicating that this established mini hatchery could serve as a productive model to support small scale farmers in GIFT seed production.

  16. Comparing the Reproductive Success of Yakima River Hatchery- and Wild-Origin Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schroder, S.L.; Pearsons, T.N. (Washington Department of Fish and Wildlife, Olympia, WA); Knudsen, C.M. (Oncorh Consulting, Olympia, WA)

    2006-05-01

    Reproductive success in wild- and first generation hatchery-origin spring Chinook males was examined by allowing the fish to compete for spawning opportunities in two sections of an observation stream. Behavioral observations were used to characterize the frequency of aggression and courting activities. Microsatellite DNA from each male and fry collected from the observation stream were used in pedigree analyses to estimate reproductive success. The coefficient of variation in male reproductive success equaled 116 and 86% in the two populations. No differences were detected in reproductive success due to hatchery or wild origin. Nor were any behavioral differences found between hatchery and wild males. Although statistical power was low due to intrinsic variation a great deal of overlap existed in the reproductive success values of hatchery and wild males. Significant disparities existed among the males on their ability to produce offspring. Males achieving high reproductive success mated with numerous females, were socially dominant, aggressive, and tended to stay in localized areas, courting and spawning with females that were adjacent to one another.

  17. Hood River and Pelton Ladder Evaluation Studies, Annual Report 2000-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, Erik

    2009-09-01

    The Bonneville Power Administration (BPA) funded the development of two master plans which outline the rationale, and general approach, for implementing a defined group of projects that are an integral part of a comprehensive watershed goal to 'Protect, enhance and restore wild and natural populations of anadromous and resident fish within the Hood River Subbasin'. The Hood River Production Master Plan and the Pelton Ladder Master Plan were completed in 1991 and subsequently approved by the Northwest Power Planning Council in 1992. Action items identified in the two master plans, as well as in a later document entitled 'Hood River/Pelton Ladder Master Agreement' (ODFW and CTWSRO Undated), are designed to achieve two biological fish objectives: (1) to increase production of wild summer and winter steelhead (Oncorhynchus mykiss) to levels commensurate with the subbasins current carrying capacity and (2) re-establishing a self-sustaining population of spring chinook salmon (Oncorhynchus tshawytscha). Numerical fish objectives for subbasin escapement, spawner escapement, and subbasin harvest are defined for each of these species in Coccoli (2000). Several projects are presently funded by the BPA to achieve the Hood River subbasin's numerical fish objectives for summer and winter steelhead and spring chinook salmon. They include BPA project numbers 1998-021-00 (Hood River Fish Habitat), 1998-053-03 (Hood River Production Program - CTWSRO: M&E), 1998-053-07 (Parkdale Fish Facility), 1998-053-08 (Powerdale/Oak Springs O&M), and 1998-053-12 (Hood River Steelhead Genetics Study). Collectively, they are implemented under the umbrella of what has come to be defined as the Hood River Production Program (HRPP). The HRPP is jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO). Strategies for achieving the HRPP's biological fish objectives for the Hood

  18. Zoonotic transmission of Chlamydia psittaci in a chicken and turkey hatchery.

    Science.gov (United States)

    Dickx, Veerle; Vanrompay, Daisy

    2011-06-01

    Chlamydia psittaci is an obligately intracellular Gram-negative bacterium causing respiratory disease (chlamydiosis) or asymptomatic carriage in birds. C. psittaci is a zoonotic agent causing psittacosis or parrot fever in humans. Vertical and/or horizontal transmission via eggs might have serious repercussions on the C. psittaci infection status of poultry flocks and thus on zoonotic risk for all workers along the poultry supply chain. We therefore studied the presence of C. psittaci in a hatchery. In addition, we examined all (n = 4) employees of the hatchery to evaluate the zoonotic risk. We could not detect C. psittaci on either eggshells or eggshell membranes. However, C. psittaci isolates of different outer-membrane protein A (ompA) genotypes were cultured from the air of both turkey (genotypes A and C) and chicken (genotype D) hatching chambers. Zoonotic transmission occurred in all employees and a mixed infection with up to three different genotypes (A, D and C), also found in air samples, was discovered. Diagnostic monitoring and reporting of C. psittaci infections in poultry workers should be promoted. Additionally, an efficient veterinary vaccine and information campaigns on zoonotic risk and preventive measures against C. psittaci transmission would be beneficial to public health.

  19. Multistate outbreak of human Salmonella Typhimurium infections linked to live poultry from agricultural feed stores and mail-order hatcheries, United States 2013

    Directory of Open Access Journals (Sweden)

    Tara C. Anderson

    2016-12-01

    Full Text Available Live poultry-associated salmonellosis is an emerging public health issue in the United States. Public and animal health officials collaborated to investigate one of the largest (356 cases, 39 states of these outbreaks reported to date. A case was defined as illness in a person infected with the outbreak strain of Salmonella Typhimurium with illness onset between 1 March and 22 October 2013. The median patient age was seven years (range: <1–87 years; 58% of ill persons were children ≤10 years, 51% were female, 25% were hospitalized; 189 (76% of 250 patients reported live poultry exposure in the week before illness; and 149 (95% of 157 reported purchasing live poultry from agricultural feed stores. Traceback investigations identified 18 live poultry sources, including 16 mail-order hatcheries. Environmental sampling was conducted at two mail-order hatcheries. One (2.5% of 40 duplicate samples collected at one hatchery yielded the outbreak strain. Live poultry are an important source of human salmonellosis, particularly among children, highlighting the need for educational campaigns and comprehensive interventions at the mail-order hatchery and agricultural feed store levels. Prevention and control efforts depend on a One Health approach, involving cooperation between public and animal health officials, industry, health professionals, and consumers.

  20. Origin of broodstock and effects on the deformities of gilthead sea bream (Sparus aurata L. 1758 in a Mediterranean commercial hatchery

    Directory of Open Access Journals (Sweden)

    John A. Theodorou

    2016-08-01

    Full Text Available Abstract The use of broodstock of different origin as a method to improve fry production performance and consequently to minimize deformities was examined at industrial scale in a commercial gilthead sea bream hatchery. The outcome of fry production from three different broodstock groups (BA: broodfish (Mediterranean with multiannual hatchery presence, BB: selected offspring originating from the BA group, and BC: broodfish of Atlantic origin was investigated in the same rearing conditions and feeding protocol. Performance factors assessed were the survival and weaning of the larvae; the mortality rates from the “weaning until the end of the hatchery stage” of the larvae/fry; the percentage of fry without swim bladder; the percentage of fry with skeletal deformities and the feed conversion ratio. In all factors, no statistical differences among the experimental groups were detected. However, due to early rejection of the deformed individuals, benefits are expected from the decrease of the supplied amount of food and the reduced labor cost.

  1. Effects of different levels of hatchery wastes on the performance, carcass and tibia ash and some blood parameters in broiler chicks.

    Science.gov (United States)

    Mehdipour, M; Shargh, M Shams; Dastar, B; Hassani, S

    2009-09-15

    This experiment was conducted to evaluate the effects of different levels of Hatchery Wastes (HW) on performance, tibia ash, blood calcium and phosphorus concentrations in broiler chickens. Birds were fed a corn-soybean meal diet for 7 days. The experimental treatments included a corn soybean meal diet and 3 other treatments containing 1.5, 3.0 and 4.5% HW. five replicate groups of 15 Ross 308 broiler chicks were allocated to each dietary treatment. Data were analyzed in a completely randomized design. Results indicated that there were no significant differences in weight gains among different dietary treatments. Feed intake in the 4.5% treatment was significantly higher (p 0.05). Results of carcass analysis showed no significant differences between treatments. Also, there were no significant differences between blood calcium and phosphorous among treatments. The 4.5 and 3.0% hatchery wastes treatments had the highest tibia ash (p hatchery wastes as much as 3% can increase tibia strength without having adverse effect on broilers performance.

  2. MOECSW trains master trainers and supervisors.

    Science.gov (United States)

    1995-01-01

    The Ministry of Education, Culture and Social Welfare (MOECSW), as part of the Population Education Programs (formal and informal), undertook a series of training programs to upgrade the knowledge and skills of master trainers, supervisors, and resource persons. As part of the Population Education in the Formal School Sector Project (NEP/93/P01), under the Curriculum Development Centre five training courses were organized to train 220 master trainers. Under the "Three Steps Training Strategy," these 220 master trainers would teach 825 secondary school headmasters who would reach 2025 secondary school teachers. The training courses were held in Dhangadi, April 23-27, 1995; in Pokhara, April 2-7; and in Biratnagar, February 20-24. The areas covered included: 1) the pedagogical aspect of population education (content, scope, objectives, nature, teaching methodologies); 2) demography and population dynamics (composition, distribution and density, sources of population data, demographic transition, consequences and determinants of population growth); 3) family life and adolescence and human sexuality education, including acquired immunodeficiency syndrome (AIDS) education; 4) maternal and child health, and family planning; 5) environment; and 6) population policy and programs. As part of the Population Education Programme (NEP/93/P08), a Master Trainers Training Workshop was held in Makwanpur, March 26-28, 1995. These master trainers would train trainers who would train the facilitators and teachers at learning centers for adult learners under the literacy and post literacy programs. This course focused on the approaches and strategies for integrating population education in development programs, and non-formal education, adult literacy, post literacy, and out-of-school children programs. Dr. D. de Rebello and Mr. S. Hutabarat, CST Advisors on Population Education, organized the training courses and served as resource persons.

  3. Cobia (Rachycentron canadum hatchery-to-market aquaculture technology: recent advances at the University of Miami Experimental Hatchery (UMEH Tecnologia da criação de beijupirá (Rachycentron canadum: recentes avanços do Laboratório de Larvicultura Experimental da Universidade de MIAMI (UMEH

    Directory of Open Access Journals (Sweden)

    Daniel Benetti

    2010-07-01

    Full Text Available Among warm-water marine fishes, cobia is one of the best aquaculture candidate species in the world. Currently there are commercial culture operations in several Asian countries and the industry has started developing elsewhere, including the Western Central Atlantic region. Significant research has been conducted at the University of Miami's Aquaculture Program / University of Miami Experimental Hatchery (UMEH during the last eight years, involving research to develop and optimize advanced technology to demonstrate the viability of raising hatchery-reared cobia in collaboration with the private sector. This paper reviews some of this recent advances for the development of Hatchery-to-Market Aquaculture Technology for commercial production of cobia.Dentre os peixes marinhos de águas quentes, o bijupirá é um dos grandes candidatos para a aquacultura no mundo. Atualmente, existem operações comerciais em vários países Asiáticos e a indústria iniciou suas operações em outros locais, incluindo a região do Atlântico Central. Pesquisas têm sido realizadas no "University of Miami's Aquaculture Program / University of Miami Experimental Hatchery (UMEH" durante os últimos oito anos envolvendo o desenvolvimento e otimização de tecnologia avançada para demonstrar a viabilidade da criação de bijupirá com colaboração com o setor privado. Este artigo revisa alguns destes avanços recentes para o desenvolvimento da tecnologia da larvicultura para o mercado para a produção comercial de bijupirá.

  4. Flexible high-speed FASTBUS master for data read-out and preprocessing

    International Nuclear Information System (INIS)

    Wurz, A.; Manner, R.

    1990-01-01

    This paper describes a single slot FASTBUS master module. It can be used for read-out and preprocessing of data that are read out from FASTBUS modules, e.g., and ADC system. The module consists of a 25 MHz, 32-bit processor MC 68030 with cache memory and memory management, a floating point coprocessor MC68882, 4 MBytes of main memory, and FASTBUS master and slave interfaces. In addition, a DMA controller for read-out of FASTBUS data is provided. The processor allows I/O via serial ports, a 16-bit parallel port, and a transputer link. Additional interfaces are planned. The main memory is multi-ported and can be accessed directly by the CPU, the FASTBUS, and external masters via the high-speed local bus that is accessible by way of a connector. The FASTBUS interface supports most of the standard operations in master and slave mode

  5. Penataan Menara BTS (Cell Planning)

    OpenAIRE

    Prijono, Wahyu Adi

    2010-01-01

    Penataan menara/BTS merupakan proses master plan penataan menara telekomunikasi seluler berdasarkan estetika dan kesesuaian dengan KKOP ( Kawasan Keselamatan Operasional Penerbangan ) dan tata ruang wilayah suatu daerah guna mendapatkan jumlah menara yang optimal di suatu wilayah.Penataan Menara Master plan meliputi, analisis potensi pengguna telepon seluler sampai 5 tahun ke depan, Prediksi deman BTS, perhitungan kapasitas BTS 5 tahun kedepan, pemetaan pola penataan pemakaian menara / tower ...

  6. Institutional Repositories: The Experience of Master's and Baccalaureate Institutions

    Science.gov (United States)

    Markey, Karen; St. Jean, Beth; Soo, Young Rieh; Yakel, Elizabeth; Kim, Jihyun

    2008-01-01

    In 2006, MIRACLE Project investigators censused library directors at all U.S. academic institutions about their activities planning, pilot testing, and implementing the institutional repositories on their campuses. Out of 446 respondents, 289 (64.8 percent) were from master's and baccalaureate institutions (M&BIs) where few operational…

  7. Genetic Characterization of Five Hatchery Populations of the Pacific Abalone (Haliotis discus hannai Using Microsatellite Markers

    Directory of Open Access Journals (Sweden)

    Jeong-In Myeong

    2011-07-01

    Full Text Available The Pacific abalone, Haliotis discus hannai, is a popular food in Eastern Asia. Aquacultural production of this species has increased because of recent resource declines, the growing consumption, and ongoing government-operated stock release programs. Therefore, the genetic characterization of hatchery populations is necessary to maintain the genetic diversity of this species and to develop more effective aquaculture practices. We analyzed the genetic structures of five cultured populations in Korea using six microsatellite markers. The number of alleles per locus ranged from 15 to 64, with an average of 23.5. The mean observed and expected heterozygosities were 0.797 and 0.904, respectively. The inbreeding coefficient FIS ranged from 0.054 to 0.184 (mean FIS = 0.121 ± 0.056. The genetic differentiation across all populations was low but significant (overall FST = 0.009, P < 0.01. Pairwise multilocus FST tests, estimates of genetic distance, and phylogenetic and principal component analyses did not show a consistent relationship between geographic and genetic distances. These results could reflect extensive aquaculture, the exchange of breeds and eggs between hatcheries and/or genetic drift due to intensive breeding practices. Thus, for optimal resource management, the genetic variation of hatchery stocks should be monitored and inbreeding controlled within the abalone stocks that are being released every year. This genetic information will be useful for the management of both H. discus hannai fisheries and the aquaculture industry.

  8. Mastering the Master Space

    CERN Document Server

    Forcella, Davide; He, Yang-Hui; Zaffaroni, Alberto

    2008-01-01

    Supersymmetric gauge theories have an important but perhaps under-appreciated notion of a master space, which controls the full moduli space. For world-volume theories of D-branes probing a Calabi-Yau singularity X the situation is particularly illustrative. In the case of one physical brane, the master space F is the space of F-terms and a particular quotient thereof is X itself. We study various properties of F which encode such physical quantities as Higgsing, BPS spectra, hidden global symmetries, etc. Using the plethystic program we also discuss what happens at higher number N of branes. This letter is a summary and some extensions of the key points of a longer companion paper arXiv:0801.1585.

  9. Distribution, feeding and growth of hatchery-reared Atlantic salmon (Salmo salar L. parr stocked into rivers with various abiotic conditions

    Directory of Open Access Journals (Sweden)

    Nikolaev A. M.

    2017-06-01

    Full Text Available Within the research of efficiency of Atlantic salmon the artificial reproduction, feeding rate, distribution and growth of farm-raised one-year-old Atlantic salmon have been examined. The fish has been released into nursery areas with different hydrological characteristics located in the Rivers Kola, Umba, Srednyaya and Akkim in the Murmansk region. The observations have being conducted for 1–5 months since the moment of fish release. In natural habitat, juveniles rapidly distribute downstream and upstream regardless of water temperature, depth and current velocity. In all examined nursery areas adapting one-year-old juveniles prefer to stay at weak current sites close to the shore, hiding in the gravel. In all the cases farmed parr shows high feed rate, but qualitative composition of their food differs significantly from food composition of wild juveniles. Revealed peculiarities of adapting parr's distribution and qualitative food composition indicate the impact of long-term rearing at hatcheries on fish behavior. Growth rate of one-year-old juveniles is arcwise connected with fraction composition of gravel and the level of bottom fouling: the bigger bottom rocks are and the thicker the fouling is, the more intensive fish growth is. The revealed correlations have been described with equations of linear regression. Connections between juvenile growth and water temperature, current velocity and depth of the area have not been detected. The research outcomes could provide a basis for scientific advice for planning release sites and number of released one-year-old Atlantic salmon by hatcheries in the Murmansk region.

  10. Effect of ozonation on microbial fish pathogens, ammonia, nitrate, nitrite, and bod in simulated reuse hatchery water

    Energy Technology Data Exchange (ETDEWEB)

    Colberg, P.J.; Lingg, A.J.

    1978-10-01

    The effectiveness of ozone for eliminating fish pathogens and reducing nitrite, ammonia, and BOD associated with reuse hatchery systems was evaluated. Comparative survival rates of four bacterial fish pathogens and a bacterium-protozoan population during batch and continuous flow ozonation indicated a specific microbial ozone demand during batch treatment and 99% mortality of pathogens during continuous flow treatment. Oxidation of carbon and nitrite by ozone was rapid at low ozone concentrations; carbon and ammonia oxidation rates were pH dependent. The oxidation capacity of ozone in water was greatest at elevated pH even though lower ozone concentrations were used. Ozone treatment appears to be successful for disinfecting hatchery makeup water for recycling. However, the economics of such treatment are yet to be determined. (10 graphs, 28 references, 1 table)

  11. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation Report 3 of 7, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Knudsen, Curtis (Oncorh Consulting, Olympia, WA)

    2004-05-01

    This is the third in a series of annual reports that address reproductive ecological research and comparisons of hatchery and wild origin spring chinook in the Yakima River basin. Data have been collected prior to supplementation to characterize the baseline reproductive ecology, demographics and phenotypic traits of the unsupplemented upper Yakima population, however this report focuses on data collected on hatchery and wild spring chinook returning in 2003; the third year of hatchery adult returns. This report is organized into three chapters, with a general introduction preceding the first chapter and summarizes data collected between April 1, 2003 and March 31, 2004 in the Yakima basin. Summaries of each of the chapters in this report are included below. A major component of determining supplementation success in the Yakima Klickitat Fishery Project's spring chinook (Oncorhynchus tshawytscha) program is an increase in natural production. Within this context, comparing upper Yakima River hatchery and wild origin fish across traits such as sex ratio, age composition, size-at-age, fecundity, run timing and gamete quality is important because these traits directly affect population productivity and individual fish fitness which determine a population's productivity.

  12. Strain Rate Effects, Transition Behaviour and Master Curve Concept

    Czech Academy of Sciences Publication Activity Database

    Dlouhý, Ivo; Pluvinage, G.; Holzmann, Miloslav

    č. 8 (2004), s. IV 16-IV 22 ISSN 1291-8199 R&D Projects: GA AV ČR IAA2041003; GA ČR GA106/01/0342 Institutional research plan: CEZ:AV0Z2041904 Keywords : ferritic steel * pressure vessel steel * master curve Subject RIV: JL - Materials Fatigue, Friction Mechanics

  13. Wenatchee Chinook Parentage - Evaluate the reproductive success of hatchery and wild Chinook salmon in the Wenatchee River

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — We are using genetic parentage analysis to measure the relative fitness of hatchery and wild spring run Chinook salmon that spawn in the Wenatchee River. In addition...

  14. Efficacy of a novel biofilter in hatchery sanitation: II. Removal of odorogenous pollutants.

    Science.gov (United States)

    Tymczyna, Leszek; Chmielowiec-Korzeniowska, Anna; Drabik, Agata; Skórska, Czesława; Sitkowska, Jolanta; Cholewa, Grazyna; Dutkiewicz, Jacek

    2007-01-01

    The present research assessed the treatment efficiency of odorogenous pollutants in air from a hatchery hall vented on organic and organic-mineral beds of an enclosed-container biofilter. In this study, the following media were used: organic medium containing compost and peat (OM); organic-mineral medium containing bentonite, compost and peat (BM); organic-mineral medium containing halloysite, compost and peat (HM). The concentration of odorogenous gaseous pollutants (sulfur compounds and amines) in the hatching room air and in the air after biotreatment were determined by gas chromatography. In the hatchery hall among the typical odorogenous pollutants, there were determined 2 amines: 2-butanamine and 2-pentanamine, hydrogen sulfide, sulfur dioxide, carbon disulfide, sulfides and mercaptans. Ethyl mercaptan showed the highest levels as its mean concentration in the hatchery hall air exceeded 60 microg/m3 and in single samples even 800 microg/m3. A mean concentration of 2-butanamine and sulfur dioxide in the examined air also appeared to be relatively high--21.405 microg/m3 and 15.279 microg/m3, respectively. In each filter material, the air treatment process ran in a different mode. As the comparison reveals, the mean reduction of odorogenous contaminants recorded in the hall and subjected to biotreatment was satisfying as it surpassed 60% for most established pollutants. These high removal values were confirmed statistically only for single compounds. However, a low removal level was reported for hydrogen sulfide and sulfur dioxide. No reduction was recorded in the bentonite supplemented medium (BM) for sulfur dioxide and methyl mercaptan. In the organic medium (OM) no concentration fall was noted for dipropyl sulfide either. In all the media investigated, the highest removal rate (100%), not confirmed statistically, was observed for carbon disulfide. Very good results were obtained in the medium with a bentonite additive (BM) for both identified amines, whose

  15. Fish Research Project, Oregon : Evaluation of the Success of Supplementing Imnaha River Steelhead with Hatchery Reared Smolts: Phase One : Completion Report.

    Energy Technology Data Exchange (ETDEWEB)

    Carmichael, Richard W.; Whitesel, Timothy A.; Jonasson, Brian C.

    1995-08-01

    Two streams in the Imnaha River subbasin (Camp Creek and Little Sheep Creek) and eight streams in the Grande Ronde River subbasin (Catherine, Deer, Five Points, Fly, Indian, Lookingglass, Meadow, and Sheep creeks) were selected as study streams to evaluate the success and impacts of steelhead supplementation in northeast Oregon. The habitat of the study streams was inventoried to compare streams and to evaluate whether habitat might influence the performance parameters we will measure in the study. The mean fecundity of hatchery and natural steelhead 1-salts returning to Little Sheep Creek fish facility in 1990 and 1991 ranged from 3,550 to 4,663 eggs/female; the mean fecundity of hatchery and natural steelhead 2-salts ranged from 5,020 to 5,879 eggs/female. Variation in length explained 57% of the variation in fecundity of natural steelhead, but only 41% to 51% of the variation in fecundity of hatchery steelhead. Adult steelhead males had an average spermatocrit of 43.9% at spawning. We were also able to stain sperm cells so that viable cells could be distinguished from dead cells. Large, red disc tags may be the most useful for observing adults on the spawning grounds. The density of wild, juvenile steelhead ranged from 0 fish/l00{sup 2} to 35.1 (age-0) and 14.0 (age-1) fish/l00m{sup 2}. Evidence provided from the National Marine Fisheries Service suggests that hatchery and wild fish within a subbasin are genetically similar. The long-term experimental design is presented as a component of this report.

  16. Genetic variation within and among Danish brown trout ( Salmo trutta L) hatchery strains, assessed by PCR-RFLP analysis of mitochondrial DNA segments

    DEFF Research Database (Denmark)

    Hansen, Michael Møller; Mensberg, Karen-Lise Dons; Rasmussen, Gorm

    1997-01-01

    differentiation among strains (Phi(ST) = 0.23) was of the same order of magnitude as that observed among wild Danish trout populations. However, minimal differentiation (Phi(ST) = 0.01) was observed among the four quantitatively most important strains, supplying 80% of all hatchery trout stocked in Denmark. (C...... of haplotypes was observed in most hatchery strains. However, computer simulations showed that even with relatively large numbers of female spawners considerable loss of haplotypes could take place over time. Therefore, reduced variability in some of the strains did not necessarily indicate a critical loss...

  17. Potencialidade do Planejamento Participativo no Brasil / Potentiality of Participative Planning in Brazil

    Directory of Open Access Journals (Sweden)

    Ideni Terezinha Antonello

    2013-10-01

    Full Text Available The main objective in this essay is making a reflection upon the potentialities presented by the recentmunicipal master plans in Brazil compared to the traditional plans, because the City Statute (2001brought a new meaning to these plans when designating them “participative master plans”, in the orientationof formulation of plans on the perspective of an effective popular participation. In order to reachthis goal, the concrete experience of two study objects will be developed: the Participative Master Planand the Participative Budget. The city of Londrina/Paraná will be taken to check the application of theassumptions of popular participation on the production of the municipal master plan, and the city ofPorto Alegre/Rio Grande do Sul, as an example of the participative budget application.

  18. Provocative Opinion: Let's Master Our Graduate Programs, Not Doctor Them Up

    Science.gov (United States)

    Pilar, Frank

    1974-01-01

    Criticizes recent Ph.D. programs carried out in many universities after World War II. Suggests university departments re-institute high quality two-year master's programs designed to train those who plan to make careers in chemistry at an applied level. (CC)

  19. Lake Roosevelt Fisheries Monitoring Progam; Thyroid-Induced Chemical Imprinting in Early Life Stages and Assessment of Smoltification in Kokanee Salmon Implications for Operating Lake Roosevelt Kokanee Salmon Hatcheries; 1993 Supplement Report.

    Energy Technology Data Exchange (ETDEWEB)

    Tilson, Mary Beth; Galloway, Heather; Scholz, Allan T. (Eastern Washington University, Upper Columbia United Tribes Fisheries Research Center, Cheney, WA)

    1994-06-01

    In 1991, two hatcheries were built to provide a kokanee salmon and rainbow trout fishery for Lake Roosevelt as partial mitigation for the loss of anadromous salmon and steelhead caused by construction of Grand Coulee Dam. The Sherman Creek Hatchery, located on a tributary of Lake Roosevelt to provide an egg collection and imprinting site, is small with limited rearing capability. The second hatchery was located on the Spokane Indian Reservation because of a spring water source that supplied cold, pure water for incubating and rearing eggs.`The Spokane Tribal Hatchery thus serves as the production facility. Fish reared there are released into Sherman Creek and other tributary streams as 7-9 month old fry. However, to date, returns of adult fish to release sites has been poor. If hatchery reared kokanee imprint to the hatchery water at egg or swim up stages before 3 months of age, they may not be imprinting as 7-9 month old fry at the time of stocking. In addition, if these fish undergo a smolt phase in the reservoir when they are 1.5 years old, they could migrate below Grand Coulee Dam and out of the Lake Roosevelt system. In the present investigation, which is part of the Lake Roosevelt monitoring program to assess hatchery effectiveness, kokanee salmon were tested to determine if they experienced thyroxine-induced chemical imprinting and smoltification similar to anadromous salmonids. Determination of the critical period for olfactory imprinting was determined by exposing kokanee to different synthetic chemicals (morpholine or phenethyl alcohol) at different life stages, and then measuring the ability to discriminate the chemicals as sexually mature adults. Whole body thyroxine content and blood plasma thyroxine concentration was measured to determine if peak thyroid activity coincided with imprinting or other morphological, physiological or behavioral transitions associated with smoltification.

  20. Regional Master on Medical Physics

    International Nuclear Information System (INIS)

    Gutt, F.

    2001-01-01

    It points out: the master project; the master objective; the medical physicist profile and tasks; the requirements to be a master student; the master programmatic contents and the investigation priorities [es

  1. Kokanee Stock Status and Contribution of Cabinet Gorge Hatchery, Lake Pend Oreille, Idaho, 1991 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Paragamian, Vaughn L.

    1991-01-01

    Initially, rehabilitation of kokanee Oncorhynchus nerka met with apparent success reaching a peak abundance of 10.2 million fishTl988. However, a decline of 47% followed from 1988 through 1991 to 5.4 million fish. The decreased population was attributed to poor recruitment of wild fish, poor egg take, thus, low stocking of hatchery fry (7.3 million in 1990 and 5.0 million in 1991 compared to about 13.0 million in 1981), and poor survival of fish ages 3 and 4 (average survival of the older fish was only 35% in 1990 compared to 72% in prior years but it was 68% in 1991). In addition, standing stocks of kokanee have remained relatively stable (x = 8.6 kg/hectare) since 1986 despite the dramatic changes in density. Prior to this study (1985) standing stocks were substantially higher (x = 13.6 kg/hectare). The kokanee population is probably operating below carrying capacity. Hatchery fry comprised 59% of the total kokanee recruitment in 1991 (93% of fry biomass). This contribution of 1.06 million fry ranked fifth behind 1988 (3.74 million), 1989 (2.25 million), 1982 (1.89 million), and 1990 (1.56 million) since hatchery supplementation began in the 1970s. Survival of hatchery fry was 21% in 1991, the second highest since this investigation began. Two release strategies were tested in 1991 of which the best survival was recorded for the Sullivan Springs release at 23% while the early Clark Fork River release continued to have lowest survival at 18%. Survival of hatchery reared kokanee fry is still below the goal of 30% and it appears that this goal may not be attainable most years. Statistical analysis between number of days from fry release to recapture day and fry survival did not reveal a relationship (P = 0.43). Survival of fry from late releases is higher (P = 0.05) than early releases but no difference (P L 0.71) was detected between stocking locations. Good survival of fry from the Sullivan Springs releases was attributed to large size of kokanee fry (55 mm), warm

  2. Study of Disease and Physiology in the 1978 Homing Study Hatchery Stocks: A Supplement to "Imprinting Salmon and Steelhead Trout for Homing" by Slatick, Novotny, and Gilbreath, January 1979.

    Energy Technology Data Exchange (ETDEWEB)

    Novotny, Anthony J.; Zaugg, Waldo S.

    1979-11-01

    The main functions of the National Marine Fisheries Service (NMFS) Aquaculture Task biologists and contractual scientists involved in the 1978 homing studies were primarily a surveillance of fish physiology, disease, and relative survival during culture in marine net-pens, to determine if there were any unusual factors that might effect imprinting and homing behavior. The studies were conducted with little background knowledge of the implications of disease and physiology on imprinting and homing in salmonids. Hatcheries and stocks sampled are listed in Table 1. The health status of the stocks was quite variable as could be expected. The Dworshak and Wells Hatcheries steelhead suffered from some early stresses in seawater, probably osmoregulatory. The incidences of latent BKD in the Wells and Chelan Hatcheries steelhead and Kooskia Hatchery spring chinook salmon were extremely high, and how these will effect survival in the ocean is not known. Gill enzyme activity in the Dworshak and Chelan Hatcheries steelhead at release was low. Of the steelhead, survival in the Tucannon Hatchery stock will probably be the highest, with Dworshak Hatchery stock the lowest. The analyses conducted by the veterinary pathologist indicate that overall there was no evidence of serious pathological conditions that might be disastrous to any given stock, but at this time it is also difficult to interpret the results of certain types of clinical pathology that have either not been previously reported or extensively studied. For example, if the 77% incidence of basophillic granular organisms in the gills of the Carson coho salmon does represent an infestation of microsporidian protozoan parasites, is the intensity of infestation severe enough to cause irreparable damage that might affect survival? The results of the viral assays are questionable because the Rangen Laboratory is the only one that found evidence of viruses in these stocks (however, the veterinary pathologist did find evidence

  3. Interfaces entre a política habitacional e o Plano Diretor Participativo na metrópole Fortaleza-CE / Relations between the housing policy and participatory master plan in metropolis Fortaleza, Ceará, Brazil

    Directory of Open Access Journals (Sweden)

    Elizete de Oliveira Santos

    2013-12-01

    Full Text Available The housing question appears as essential element to understanding the production, consumption and appropriation processes of urban space, illuminating the relationship between sociospatial segregation and real state speculation that govern the brazilians' cities structuring. This paper proposes to discuss the relations between the Participatory Master Plan of Fortaleza (PDPFor and the Municipal Housing Policy (PHIS, aiming to contribute to the reflection of the importance of the urban and housing policies integration. The text is divided into three parts: the first discusses the context of the emergence of the master plans "new generation" in Brazil; the second reconstructs the preparation process of the PDPFor and PHIS; and the third proposes a questioning about the dialogue between the urban and housing political, based on the analysis of the content of PHIS and housing policy chapter in PDPFor.

  4. Strategic planning and security analysis

    International Nuclear Information System (INIS)

    DePasquale, S.

    1991-01-01

    Nuclear security master planning is a deliberative process, founded on the premise that the broad scope of security must be analyzed before any meaningful determinations may be reached on an individual security aspect. This paper examines the analytical process required in developing a Security Master Plan. It defines a four stage process concluding with the selection of security measures encompassing physical security, policy and procedure considerations and guard force deployment. The final product orchestrates each security measure in a complementary and supportive configuration

  5. Cedar River Chinook genotypes - Estimate relative reproductive success of hatchery and wild fall Chinook salmon in the Cedar River

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — We are using genetic pedigree information to estimate the reproductive success of hatchery and wild fall-run Chinook salmon spawning in the Cedar River, Washington....

  6. Comparison of Staphylococcus aureus recovered from personnel in a poultry hatchery and in broiler parent farms with those isolated from skeletal disease in broilers.

    Science.gov (United States)

    Rodgers, J D; McCullagh, J J; McNamee, P T; Smyth, J A; Ball, H J

    1999-09-15

    Personnel from one broiler hatchery, and workers on 18 separate broiler parent farms which supply the hatchery, were tested for hand and nasal carriage of Staphylococcus aureus. In both locations, nasal carriage of S. aureus was more common than hand carriage. A total of 63 S. aureus strains were characterised by biotyping, protein A analysis and pulsed field gel electrophoresis (PFGE) typing. Of these, 36 were recovered from broiler hatchery personnel, 14 from broiler parent farm personnel and 13 from cases of skeletal disease in commercial broilers. Biotyping and protein A analysis indicated that none of the strains recovered from hatchery personnel were of the poultry biotype, but that two strains recovered from the hands of two broiler parent farm personnel could be grouped together with 12/13 of strains recovered from skeletal disease in broilers, as poultry biotypes. PFGE-typing could not distinguish 9/13 strains recovered from skeletal disease in broilers and one of the strains from the broiler parent farm personnel from isolate 24 (I. 24), which is the predominant S. aureus strain type associated with clinical disease in N. Ireland broiler flocks. The present study found no evidence of nasal carriage of S. aureus strains of poultry biotype by humans. The finding of hand carriage by broiler parent farm personnel, suggests that handling by personnel may contribute to the dissemination of I. 24 or other S. aureus strains associated with skeletal disease in broilers.

  7. Chapter 8: Planning Tools to Simulate and Optimize Neighborhood Energy Systems

    Energy Technology Data Exchange (ETDEWEB)

    Zhivov, Alexander Michael; Case, Michael Patrick; Jank, Reinhard; Eicker, Ursula; Booth, Samuel

    2017-03-15

    This section introduces different energy modeling tools available in Europe and the USA for community energy master planning process varying from strategic Urban Energy Planning to more detailed Local Energy Planning. Two modeling tools used for Energy Master Planning of primarily residential communities, the 3D city model with CityGML, and the Net Zero Planner tool developed for the US Department of Defense installations are described in more details.

  8. Loss of genetic variation in Greek hatchery populations of the European sea bass (Dicentrarchus labrax L. as revealed by microsatellite DNA analysis

    Directory of Open Access Journals (Sweden)

    D. LOUKOVITIS

    2014-10-01

    Full Text Available Genetic variation in four reared stocks of European sea bass Dicentrarchus labrax L., originating from Greek commercial farms, was assessed using five polymorphic microsatellite markers and was compared with that of three natural populations from Greece and France. The total number of alleles per marker ranged from 8 to 22 alleles, and hatchery samples showed the same levels of observed heterozygosity with samples from the wild but substantially smaller allelic richness and expected heterozygosity. The genetic differentiation of cultivated samples between them as well as from the wild origin fish was significant as indicated by Fst analysis. All population pairwise comparisons were statistically significant, except for the pair of the two natural Greek populations. Results of microsatellite DNA analysis herein showed a 37 % reduction of the mean allele number in the hatchery samples compared to the wild ones, suggesting random genetic drift and inbreeding events operating in the hatcheries. Knowledge of the genetic variation in D. labrax cultured populations compared with that in the wild ones is essential for setting up appropriate guidelines for proper monitoring and management of the stocks either under traditional practices or for the implementation of selective breeding programmes.

  9. A Study on the Optimum Bucket Size for Master Scheduling : For the Case of Hierarchically tured Products

    OpenAIRE

    木内, 正光

    2010-01-01

    The function of master scheduling is to plan the flow of order from its arrival to its completion. In this study, the problem of bucket size for master scheduling is taken up. The bucket size for master scheduling has much influence on the lead time of the order. However, to date there is no clear method for how to set the optimum bucket size. The purpose of this study is to propose a method to set the optimum bucket size. In this paper, an equation to estimate the optimum bucket size is prop...

  10. Transparency masters for mathematics revealed

    CERN Document Server

    Berman, Elizabeth

    1980-01-01

    Transparency Masters for Mathematics Revealed focuses on master diagrams that can be used for transparencies for an overhead projector or duplicator masters for worksheets. The book offers information on a compilation of master diagrams prepared by John R. Stafford, Jr., audiovisual supervisor at the University of Missouri at Kansas City. Some of the transparencies are designed to be shown horizontally. The initial three masters are number lines and grids that can be used in a mathematics course, while the others are adaptations of text figures which are slightly altered in some instances. The

  11. Master plan for renewable energies + Summary for policy makers + Presentation to the Council of Ministers

    International Nuclear Information System (INIS)

    Blanc, Julien; Bitot, Stephane

    2012-01-01

    This document reports a study which aimed at determining a master plan which would allow a mix with 50 per cent of renewable energies for electricity production to be reached by 2020 in the specific case of French Polynesia. It proposes a comprehensive analysis of of the present energetic situation in Tahiti and in eleven islands of the French Polynesia. After a presentation of the social and economic context, the report proposes a diagnosis of energy and electricity consumption in Polynesia, an analysis of electricity demand and of its possible evolutions (scenarios), and an analysis of the present production (fossil thermal, hydroelectric, photovoltaic, and wind energy, quality and requirements for an island grid). It reports the analysis the potential of development of renewable energies (hydroelectricity, photovoltaic, other solar production, wind, biomass, marine renewable energies, seawater air conditioning), and the analysis of the supply-demand balance in the different scenarios for Tahiti and the other islands. Short term perspectives are discussed, and an overview of installed renewable powers is provided. A second document proposes a summary of this study under the form of a Power Point presentation illustrated by many graphs

  12. Master Plan UMKM Berbasis Perikanan untuk Meningkatkan Pengolahan Produk Ikan yang Memiliki Nilai Tambah Tinggi

    Directory of Open Access Journals (Sweden)

    I Gede Riana

    2015-11-01

    Full Text Available This research aims to generate a Master plan of fisheries-based SME development concept in Bali region, in order to build Bali as the centre for production and processing of fishery products in the Coridor of Bali-Nusa Tenggara. In Year-1 of the study period, the research activities carried out includes three processes, including analysis of the potensial of SMEs, analyzes the business cycle, and identification of barriers and chalenges. By using the method of linear regression analysis, Geographic Information System (GIS and Analytical Hierarchy Process (AHP, the study result in Year-1, obtained some information about characteristics of fisheries based SMEs Bali, consisting of: 1 there is positive effect between GDP growth and energy work on the level of productivity (output value of SMEs; 2 the need for development of fisheries-based SMEs in Bali include some operational, capital, and market access aspects. To the Bali Provincial Government, SMEs and the poblic are expected to synergize themselves, in term of institutionally, improving the quality of human recources, empowering financial institutions at the local level, as well as active participation in marketing access to the international level.

  13. Evaluation of the Contribution of Fall Chinook Salmon Reared at Columbia River Hatcheries to the Pacific Salmon Fisheries, 1989 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Vreeland, Robert R.

    1989-10-01

    In 1979 this study was initiated to determine the distribution, contribution, and value of artificially propagated fall chinook salmon from the Columbia River. Coded wire tagging (CWT) of hatchery fall chinook salmon began in 1979 with the 1978 brood and was completed in 1982 with the 1981 brood of fish at rearing facilities on the Columbia River system. From 18 to 20 rearing facilities were involved in the study each brood year. Nearly 14 million tagged fish, about 4% of the production, were released as part of this study over the four years, 1979 through 1982. Sampling for recoveries of these tagged fish occurred from 1980 through 1986 in the sport and commercial marine fisheries from Alaska through California, Columbia River fisheries, and returns to hatcheries and adjacent streams. The National Marine Fisheries Service coordinated this study among three fishery agencies: US Fish and Wildfire Service, Oregon Department of Fish and Wildlife, and Washington Department of Fisheries. The objectives of this study were to determine the distribution, fishery contribution, survival, and value of the production of fall chinook salmon from each rearing facility on the Columbia River system to Pacific coast salmon fisheries. To achieve these objectives fish from each hatchery were given a distinctive CWT. 81 refs., 20 figs., 68 tabs.

  14. Hybrid quantum-classical master equations

    International Nuclear Information System (INIS)

    Diósi, Lajos

    2014-01-01

    We discuss hybrid master equations of composite systems, which are hybrids of classical and quantum subsystems. A fairly general form of hybrid master equations is suggested. Its consistency is derived from the consistency of Lindblad quantum master equations. We emphasize that quantum measurement is a natural example of exact hybrid systems. We derive a heuristic hybrid master equation of time-continuous position measurement (monitoring). (paper)

  15. Wenatchee River steelhead reproductive success - Estimate the relative reproductive success of hatchery and wild steelhead in the Wenatchee River, WA

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This project uses genetic parentage analysis to estimate the relative reproductive success of hatchery and wild steelhead spawning in the Wenatchee River, WA. The...

  16. EFFECT OF FEEDING COOKED HATCHERY WASTE ON THE PERFORMANCE OF BROILERS

    Directory of Open Access Journals (Sweden)

    Sohail Hassan Khan and Bashir Mahmood Bhatti

    2002-01-01

    Full Text Available Raw hatchery waste was cooked with water at 2:1 ratio for 15 minutes and then oven dried at 65C and ground. Hatchery waste meal (HWM thus prepared contained 32% crude protein, 16% ether extract, 0.9% crude fibre, 40% total ash, 11.1% nitrogen free extract, 20% calcium and 0.6 % available phosphorous with no E.Coli and Salmonella. In biological evaluation trail, non significant differences was observed among rations in which HWM replaced the fish meal at 0(A, 25(B, 50(C and 75 (D levels in broiler rations. These rations showed that protein efficiency ratios were 1.68, 1.79, 1.65,and 1.64 apparent biological value 59.96, 60.25, 59.75 and 58.32% respectively, indicating better balance of amino acid in HWM to be replaced with fish meal,. In 6 weeks performance trail, the body weight gains were 1807.69, 1916.39, 1788.39 and 1635.66 gm in A, B, C and D rations, respectively. Whereas, FCR values were 2.59, 2.32, 2.43 and 2.63 in the corresponding groups, which shows no significant difference among all rations. The cost per chick to market age was lowest in ration containing high level of HWM (7.5% and highest in ration containing high level of fish meal (10% indicating maximum replacement of fish meal by HWM in broiler ration is economical. Similarly, slaughtering data revealed no significant difference among all rations in all parameters. It may be concluded that the HWM can completely replace fish meal in commercial broiler rations.

  17. 75 FR 6058 - Federal Sport Fish Restoration; California Department of Fish and Game Fish Hatchery and Stocking...

    Science.gov (United States)

    2010-02-05

    ...] Federal Sport Fish Restoration; California Department of Fish and Game Fish Hatchery and Stocking Program... (NEPA) of 1969, as amended, for the EIR/EIS jointly prepared with CDFG. Under the Sport Fish Restoration... has authority to grant Federal funds from the Sport Fish Restoration and Boating Trust Fund to support...

  18. MASTER-ICATE constraints on the outburst time of OGLE-2012-NOVA-002

    Science.gov (United States)

    Levato, H.; Saffe, C.; Mallamaci, C.; Lopez, C.; Denisenko, F. Podest D.; Gorbovskoy, E.; Lipunov, V.; Balanutsa, P.; Tiurina, N.; Kornilov, V.; Belinski, A.; Shatskiy, N.; Chazov, V.; Kuznetsov, A.; Zimnukhov, D.; Krushinsky, V.; Zalozhnih, I.; Popov, A.; Bourdanov, A.; Punanova, A.; Ivanov, K.; Yazev, S.; Budnev, N.; Konstantinov, E.; Chuvalaev, O.; Poleshchuk, V.; Gress, O.; Parkhomenko, A.; Tlatov, A.; Dormidontov, D.; Senik, V.; Yurkov, V.; Sergienko, Y.; Varda, D.; Sinyakov, E.; Shumkov, V.; Shurpakov, S.; Podvorotny, P.

    2012-10-01

    MASTER-ICATE very wide field camera (72-mm f/1.2 lens + 11 Mpx CCD) located at Observatorio Astronomico Felix Aguilar (OAFA) near San Juan, Argentina, has observed the position of possible Nova OGLE-2012-NOVA-002 reported by L. Wyrzykowski et al. (ATel #4483) several times before 2012 May 20 and then again after 2012 July 03. MASTER-WFC is continuously imaging the areas of sky (24x16 sq. deg. field of view) with 5-sec unfiltered exposures.

  19. Development of Design Technology on Thermal-Hydraulic Performance in Tight-Lattice Rod Bundles: I-Master Plan and Executive Summary

    Science.gov (United States)

    Ohnuki, Akira; Kureta, Masatoshi; Yoshida, Hiroyuki; Tamai, Hidesada; Liu, Wei; Misawa, Takeharu; Takase, Kazuyuki; Akimoto, Hajime

    R&D project to investigate thermal-hydraulic performance in tight-lattice rod bundles for Innovative Water Reactor for Flexible Fuel Cycle has been progressed at Japan Atomic Energy Agency in collaboration with power utilities, reactor vendors and universities since 2002. In this series-study, we will summarize the R&D achievements using large-scale test facility (37-rod bundle with full-height and full-pressure), model experiments and advanced numerical simulation technology. This first paper described the master plan for the development of design technology and showed an executive summary for this project up to FY2005. The thermal-hydraulic characteristics in the tight-lattice configuration were investigated and the feasibility was confirmed based on the experiments. We have developed the design technology including 3-D numerical simulation one to evaluate the effects of geometry/scale on the thermal-hydraulic behaviors.

  20. Colville Tribal Fish Hatchery, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fairgrieve, William; Christensen, David (Colville Confederated Tribes, Nespelem, WA)

    2004-04-01

    The Colville Tribal Hatchery produced 62,335 pounds of trout during the contract period, however, only 46,092 pounds were liberated to lakes and streams. The remaining production will be carried over to 2004 to be planted as larger fish into reservation waters for the lakes opener. New raceways were completed in November and brought on line in the spring. These raceways currently hold the redband rainbow brood stock and will be spawned in 2004. Efforts are continuing to capture redbands from other streams in coordination with the monitoring and evaluation program. Creel was expanded by hiring a second creel clerk to give better coverage of reservation waters by reducing travel time. Marking continues on all fish planted from CTH and refinements continue to be made. The first tag retention study has been completed and the second study is now underway to determine long term tag recognition. Lakes continue to be surveyed to complete the baseline analysis of all reservation lakes and will be completed in 2004.

  1. A European Master's Programme in Public Health Nutrition.

    Science.gov (United States)

    Yngve, A; Warm, D; Landman, J; Sjöström, M

    2001-12-01

    Effective population-based strategies require people trained and competent in the discipline of Public Health Nutrition. Since 1997, a European Master's Programme in Public Health Nutrition has been undergoing planning and implementation, by establishing initial quality assurance systems with the aid of funding from the European Commission (DG SANCO/F3). Partners from 17 European countries have been involved in the process. A European Network of Public Health Nutrition has been developed and accredited by the European Commission.

  2. AFSC/RACE/SAP/Long: Data on the effects of release density on release success in hatchery-reared red king crab

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data is from an experiment designed to test the viability of using hatchery reared crab to supplement wild stocks and to determine the optimal density for...

  3. Comparative Survival Study (CSS) of Hatchery PIT-tagged Spring/Summer Chinook; Migration Years 1997-2002 Mark/Recapture Activities and Bootstrap Analysis, 2003-2004 Biennial Report.

    Energy Technology Data Exchange (ETDEWEB)

    Berggren, Thomas J.; Franzoni, Henry; Basham, Larry R. (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2003-11-01

    The Comparative Survival Study (CSS) was initiated in 1996 as a multi-year program of the fishery agencies and tribes to estimate survival rates over different life stages for spring and summer Chinook (hereafter, Chinook) produced in major hatcheries in the Snake River basin and from selected hatcheries in the lower Columbia River. Much of the information evaluated in the CSS is derived from fish tagged with Passive Integrated Transponder (PIT) tags. A comparison of survival rates of Chinook marked in two different regions (which differ in the number of dams Chinook have to migrate through) provides insight into the effects of the Snake/Columbia hydroelectric system (hydrosystem). The CSS also compares the smolt-to-adult survival rates (SARs) for Snake River Chinook that were transported versus those that migrated in-river to below Bonneville Dam. Additional comparisons can be made within in-river experiences as well as comparison between the different collector projects from which smolts are transported. CSS also compares survival rates for wild Snake River spring and summer Chinook. These comparisons generate information regarding the relative effects of the current management actions used to recover this listed species. Scientists and managers have recently emphasized the importance of delayed hydrosystem mortality to long-term management decisions. Delayed hydrosystem mortality may be related to the smolts experience in the Federal Columbia River Power System, and could occur for both smolts that migrate in-river and smolts that are transported. The CSS PIT tag information on in-river survival rates and smolt-to-adult survival rates (SARs) of transported and in-river fish are relevant to estimation of ''D'', which partially describes delayed hydrosystem mortality. The parameter D is the differential survival rate of transported fish relative to fish that migrate in-river, as measured from below Bonneville Dam to adults returning to Lower

  4. Master-slave manipulator

    International Nuclear Information System (INIS)

    Haaker, L.W.; Jelatis, D.G.

    1981-01-01

    A remote control master-slave manipulator for performing work on the opposite side of a barrier wall, is described. The manipulator consists of a rotatable horizontal support adapted to extend through the wall and two longitudinally extensible arms, a master and a slave, pivotally connected one to each end of the support. (U.K.)

  5. Design, implementation and testing of master slave robotic surgical system

    International Nuclear Information System (INIS)

    Ali, S.A.

    2015-01-01

    The autonomous manipulation of the medical robotics is needed to draw up a complete surgical plan in development. The autonomy of the robot comes from the fact that once the plan is drawn up off-line, it is the servo loops, and only these, that control the actions of the robot online, based on instantaneous control signals and measurements provided by the vision or force sensors. Using only these autonomous techniques in medical and surgical robotics remain relatively limited for two main reasons: Predicting complexity of the gestures, and human Safety. Therefore, Modern research in haptic force feedback in medical robotics is aimed to develop medical robots capable of performing remotely, what a surgeon does by himself. These medical robots are supposed to work exactly in the manner that a surgeon does in daily routine. In this paper the master slave tele-robotic system is designed and implemented with accuracy and stability by using 6DOF (Six Degree of Freedom) haptic force feedback devices. The master slave control strategy, haptic devices integration, application software designing using Visual C++ and experimental setup are considered. Finally, results are presented the stability, accuracy and repeatability of the system. (author)

  6. Design, Implementation and Testing of Master Slave Robotic Surgical System

    Directory of Open Access Journals (Sweden)

    Syed Amjad Ali

    2015-01-01

    Full Text Available The autonomous manipulation of the medical robotics is needed to draw up a complete surgical plan in development. The autonomy of the robot comes from the fact that once the plan is drawn up off-line, it is the servo loops, and only these, that control the actions of the robot online, based on instantaneous control signals and measurements provided by the vision or force sensors. Using only these autonomous techniques in medical and surgical robotics remain relatively limited for two main reasons: Predicting complexity of the gestures, and human Safety. Therefore, Modern research in haptic force feedback in medical robotics is aimed to develop medical robots capable of performing remotely, what a surgeon does by himself. These medical robots are supposed to work exactly in the manner that a surgeon does in daily routine. In this paper the master slave tele-robotic system is designed and implemented with accuracy and stability by using 6DOF (Six Degree of Freedom haptic force feedback devices. The master slave control strategy, haptic devices integration, application software designing using Visual C++ and experimental setup are considered. Finally, results are presented the stability, accuracy and repeatability of the system

  7. Master Veteran Index (MVI)

    Data.gov (United States)

    Department of Veterans Affairs — As of June 28, 2010, the Master Veteran Index (MVI) database based on the enhanced Master Patient Index (MPI) is the authoritative identity service within the VA,...

  8. Master classes - What do they offer?

    OpenAIRE

    Hanken, Ingrid Maria; Long, Marion

    2012-01-01

    Master classes are a common way to teach music performance, but how useful are they in helping young musicians in their musical development? Based on his experiences of master classes Lali (2003:24) states that “For better or for worse, master classes can be life-changing events.” Anecdotal evidence confirm that master classes can provide vital learning opportunities, but also that they can be of little use to the student, or worse, detrimental. Since master classes are a common component in ...

  9. MOOCs to internationalize Masters. A case study at the University of Salamanca

    Science.gov (United States)

    Pereira, Dolores; Recio, Marian; Perez, Ana Victoria; López, Santiago; Palacios, Esther

    2015-04-01

    Current major objectives of Master's degrees taught at the University of Salamanca are to incorporate multidisciplinary skills and to address international issues. It is important to ensure that students and early career scientists have all of the necessary skills to deal with professional development before career planning whether in academic research, professional practices or alternative careers, whether in Spain or elsewhere. However, many students choose a Master's programme without sufficient understanding of what they might need to deal with. A multidisciplinary degree course at the University of Salamanca, linked to the Institute of Social Studies for Science and Technology, focuses on training potential experts equipped to mediate between participants in science and technology and the wider public. Students participating in this course currently come from Spanish speaking countries. Because the course is taught mainly in Spanish, subsequent outreach might also be confined to Spanish speaking communities. Even so, it is essential to properly explain, at the outset, the aims of the Master's programme and the international potential of the qualification to attract more. Here we propose the use of MOOCs (Massive Open Online Courses) both to help students to know about the content and other details of the Master program before they join in and to internationalize the course to reach more potential interested students in the subject. This will be the first experience implementing MOOCs in the teaching of masters at the University of Salamanca and, if successful, the experience can be applied to other masters and courses in need of students and internationalization.

  10. Study of Disease and Physiology in the 1979 Homing Study Hatchery Stocks: A Supplement to "Imprinting Salmon and Steelhead Trout for Homing", 1979 by Slatick, Gilbreath, and Walch.

    Energy Technology Data Exchange (ETDEWEB)

    Novotny, Anthony J.; Zaugg, Waldo S.

    1981-09-01

    The National Marine Fisheries Service (NMFS), under contract to the Bonneville Power Administration, is conducting research on imprinting salmon and steelhead for homing (Slatick et al. 1979, 1980; Novotny and Zaugg 1979). The studies were begun with little background knowledge of the effects of disease or certain physiological functions on imprinting and homing in salmonids. Consequently, work aimed at filling this void was begun by the authors in 1978 (Novotny and Zaugg 1979) and continued in 1979. In 1979, we examined random samples of normal populations of homing test fish at the hatcheries to determine the physiological readiness to migrate and adapt to seawater and general fish health. At the Manchester Marine Experimental Station, Manchester, Washington, we determined the survival of samples of the test fish maintained in marine net-pens after release from the hatcheries. Hatcheries and stocks sampled are listed in Table 1.

  11. Very Bright CV discovered by MASTER-ICATE (Argentina)

    Science.gov (United States)

    Saffe, C.; Levato, H.; Mallamaci, C.; Lopez, C.; Lipunov, F. Podest V.; Denisenko, D.; Gorbovskoy, E.; Tiurina, N.; Balanutsa, P.; Kornilov, V.; Belinski, A.; Shatskiy, N.; Chazov, V.; Kuznetsov, A.; Yecheistov, V.; Yurkov, V.; Sergienko, Y.; Varda, D.; Sinyakov, E.; Gabovich, A.; Ivanov, K.; Yazev, S.; Budnev, N.; Konstantinov, E.; Chuvalaev, O.; Poleshchuk, V.; Gress, O.; Frolova, A.; Krushinsky, V.; Zalozhnih, I.; Popov, A.; Bourdanov, A.; Parkhomenko, A.; Tlatov, A.; Dormidontov, D.; Senik, V.; Podvorotny, P.; Shumkov, V.; Shurpakov, S.

    2013-06-01

    MASTER-ICATE very wide-field camera (d=72mm f/1.2 lens + 11 Mpix CCD) located near San Juan, Argentina has discovered OT source at (RA, Dec) = 14h 20m 23.5s -48d 55m 40s on the combined image (exposure 275 sec) taken on 2013-06-08.048 UT. The OT unfiltered magnitude is 12.1m (limit 13.1m). There is no minor planet at this place. The OT is seen in more than 10 images starting from 2013-06-02.967 UT (275 sec exposure) when it was first detected at 12.4m.

  12. Planetary Sciences practical experiences at the Master level with small telescopes

    Science.gov (United States)

    Sanchez-Lavega, A.; Perez-Hoyos, S.; del Rio-Gaztelurrutia, T.; Hueso, R.; Ordonez Etxeberria, I.; Rojas, J. F.

    2016-12-01

    The Master in Space Science and Technology of the Basque Country University UPV/EHU in Bilbao (Spain) has been taught during 7 years (A. Sanchez-Lavega et al., Eur. J. of Eng. Education. 2014). Along the different courses, a series of practical observations and studies of planetary sciences have been conducted with Master students, using telescopes with diameters in the range 28-50 cm pertaining to the Aula EspaZio Gela Observatory (http://www.ehu.eus/aula-espazio/presentacion.html). Simple instrumentation (cameras and a spectrograph) have been employed to study planetary atmospheres (dynamics and cloud structure) and orbital mechanics using the Galilean satellites. Here we present a sample of these studies, which have lead to publications in refereed journals and have been presented at different meetings with the coauthoring of the students. Plans for the future include involving the master students in high-resolution observations of Solar System planets using a remote controlled 36 cm telescope at the Calar Alto observatory in Southern Spain (separated 1000 km from the teaching facilities in Bilbao).

  13. 46 CFR 122.503 - Voyage plan.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Voyage plan. 122.503 Section 122.503 Shipping COAST... Emergencies § 122.503 Voyage plan. (a) The master of the following vessels shall prepare a voyage plan: (1) A... United States Great Lakes port from a Canadian Great Lakes port. (b) The voyage plan required by...

  14. Learning profiles of Master students

    DEFF Research Database (Denmark)

    Sprogøe, Jonas; Hemmingsen, Lis

    2005-01-01

    at DPU in 2001 several evaluations and research have been carried out on several topics relating to form, content, and didactics, but one important focus is missing: the research about the psychological profile and learning style of the master student. Knowledge is lacking on how teaching methods......Master education as a part of lifelong learning/education has over the last years increased in Denmark. Danish Universities now offer more than110 different programmes. One of the characteristics of the master education is that the students get credits for their prior learning and practical work...... experiences, and during the study/education theory and practise is combined. At the Master of Adult Learning and Human Resource Development, one of DPU´s master programmes, the students have a very diverse background and have many different experiences and practises. Since the first programme was introduced...

  15. 14 CFR 152.113 - Application requirements: Airport planning.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Application requirements: Airport planning....113 Application requirements: Airport planning. (a) Application for Federal assistance. An eligible sponsor or planning agency that desires to obtain Federal aid for eligible airport master planning or...

  16. Yakima/Klickitat Fisheries Project Monitoring and Evaluation, Final Report For the Performance Period May 1, 2008 through April 30, 2009.

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, Melvin R. [The Confederated Tribes and Bands of the Yakama Nation

    2009-07-30

    The Yakima-Klickitat Fisheries Project (YKFP) is a joint project of the Yakama Nation (lead entity) and the Washington State Department of Fish and Wildlife (WDFW) and is sponsored in large part by the Bonneville Power Administration (BPA) with oversight and guidance from the Northwest Power and Conservation Council (NPCC). It is among the largest and most complex fisheries management projects in the Columbia Basin in terms of data collection and management, physical facilities, habitat enhancement and management, and experimental design and research on fisheries resources. Using principles of adaptive management, the YKFP is attempting to evaluate all stocks historically present in the Yakima subbasin and apply a combination of habitat restoration and hatchery supplementation or reintroduction, to restore the Yakima Subbasin ecosystem with sustainable and harvestable populations of salmon, steelhead and other at-risk species. The original impetus for the YKFP resulted from the landmark fishing disputes of the 1970s, the ensuing legal decisions in United States versus Washington and United States versus Oregon, and the region's realization that lost natural production needed to be mitigated in upriver areas where these losses primarily occurred. The YKFP was first identified in the NPCC's 1982 Fish and Wildlife Program (FWP) and supported in the U.S. v Oregon 1988 Columbia River Fish Management Plan (CRFMP). A draft Master Plan was presented to the NPCC in 1987 and the Preliminary Design Report was presented in 1990. In both circumstances, the NPCC instructed the Yakama Nation, WDFW and BPA to carry out planning functions that addressed uncertainties in regard to the adequacy of hatchery supplementation for meeting production objectives and limiting adverse ecological and genetic impacts. At the same time, the NPCC underscored the importance of using adaptive management principles to manage the direction of the Project. The 1994 FWP reiterated the

  17. Arizona TeleMedicine Network: Engineering Master Plan.

    Science.gov (United States)

    Atlantic Research Corp., Alexandria, VA.

    As the planning document for establishing a statewide health communications system initially servicing the Papago, San Carlos and White Mountain Apache, Navajo, and Hopi reservations, this document prescribes the communications services to be provided by the Arizona TeleMedicine Network. Specifications include: (1) communications services for each…

  18. Elemental signatures in otoliths of hatchery rainbow trout (Oncorhynchus mykiss): Distinctiveness and utility fo detecting origins and movement

    Science.gov (United States)

    Gibson-Reinemer, D. K.; Johnson, B.M.; Martinez, P.J.; Winkelman, D.L.; Koenig, A.E.; Woodhead, J.D.

    2009-01-01

    Otolith chemistry in freshwater has considerable potential to reveal patterns of origin and movement, which would benefit traditional fisheries management and provide a valuable tool to curb the spread of invasive and illicitly stocked species. We evaluated the relationship between otolith and water chemistry for five markers (Ba/Ca, Mn/Ca, Sr/ Ca, Zn/Ca, and 87Sr/86Sr) in rainbow trout (Oncorhynchus mykiss) using the existing hatchery system in Colorado and Wyoming, USA, to provide controlled, seminatural conditions. Otolith Ba/Ca, Sr/Ca, and 87Sr/86Sr reflected ambient levels, whereas Mn/Ca and Zn/Ca did not. Using only the markers correlated with water chemistry, we classified fish to their hatchery of origin with up to 96% accuracy when element and isotope data were used together. Large changes in 87Sr/Sr were evident in otolith transects, although subtler changes in Sr/Ca were also detectable. Our results suggest the relatively few otolith markers that reflect ambient chemistry can discriminate among locations and track movements well enough to provide valuable insight in a variety of applied contexts.

  19. Assessment of High Rates of Precocious Male Maturation in a Spring Chinook Salmon Supplementation Hatchery Program, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Donald; Beckman, Brian; Cooper, Kathleen

    2003-08-01

    The Yakima River Spring Chinook Salmon Supplementation Project in Washington State is currently one of the most ambitious efforts to enhance a natural salmon population in the United States. Over the past five years we have conducted research to characterize the developmental physiology of naturally- and hatchery-reared wild progeny spring chinook salmon (Oncorhynchus tshawytscha) in the Yakima River basin. Fish were sampled at the main hatchery in Cle Elum, at remote acclimation sites and, during smolt migration, at downstream dams. Throughout these studies the maturational state of all fish was characterized using combinations of visual and histological analysis of testes, gonadosomatic index (GSI), and measurement of plasma 11-ketotestosterone (11-KT). We established that a plasma 11-KT threshold of 0.8 ng/ml could be used to designate male fish as either immature or precociously maturing approximately 8 months prior to final maturation (1-2 months prior to release as 'smolts'). Our analyses revealed that 37-49% of the hatchery-reared males from this program undergo precocious maturation at 2 years of age and a proportion of these fish appear to residualize in the upper Yakima River basin throughout the summer. An unnaturally high incidence of precocious male maturation may result in loss of potential returning anadromous adults, skewing of female: male sex ratios, ecological, and genetic impacts on wild populations and other native species. Precocious male maturation is significantly influenced by growth rate at specific times of year and future studies will be conducted to alter maturation rates through seasonal growth rate manipulations.

  20. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  1. Monitoring the Reproductive Success of Naturally Spawning Hatchery and Natural Spring Chinook Salmon in the Wenatchee River, 2008-2009 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ford, Michael J.; Williamson, Kevin S. [Northwest Fisheries Science Center

    2009-05-28

    We investigated differences in the statistical power to assign parentage between an artificially propagated and wild salmon population. The propagated fish were derived from the wild population, and are used to supplement its abundance. Levels of genetic variation were similar between the propagated and wild groups at 11 microsatellite loci, and exclusion probabilities were >0.999999 for both groups. The ability to unambiguously identify a pair of parents for each sampled progeny was much lower than expected, however. Simulations demonstrated that the proportion of cases the most likely pair of parents were the true parents was lower for propagated parents than for wild parents. There was a clear relationship between parentage assignment ability and the degree of linkage disequilibrium, the estimated effective number of breeders that produced the parents, and the size of the largest family within the potential parents. If a stringent threshold for parentage assignment was used, estimates of relative fitness were biased downward for the propagated fish. The bias appeared to be largely eliminated by either fractionally assigning progeny among parents in proportion to their likelihood of parentage, or by assigning progeny to the most likely set of parents without using a statistical threshold. We used a DNA-based parentage analysis to measure the relative reproductive success of hatchery- and natural-origin spring Chinook salmon in the natural environment. Both male and female hatchery-origin fish produced far fewer juvenile progeny per parent when spawning naturally than did natural origin fish. Differences in age structure, spawning location, weight and run timing were responsible for some of the difference in fitness. Male size and age had a large influence on fitness, with larger and older males producing more offspring than smaller or younger individuals. Female size had a significant effect on fitness, but the effect was much smaller than the effect of size on

  2. Strategic Planning for Computer-Based Educational Technology.

    Science.gov (United States)

    Bozeman, William C.

    1984-01-01

    Offers educational practitioners direction for the development of a master plan for the implementation and application of computer-based educational technology by briefly examining computers in education, discussing organizational change from a theoretical perspective, and presenting an overview of the planning strategy known as the planning and…

  3. Scientifically defensible fish conservation and recovery plans: Addressing diffuse threats and developing rigorous adaptive management plans

    Science.gov (United States)

    Maas-Hebner, Kathleen G.; Schreck, Carl B.; Hughes, Robert M.; Yeakley, Alan; Molina, Nancy

    2016-01-01

    We discuss the importance of addressing diffuse threats to long-term species and habitat viability in fish conservation and recovery planning. In the Pacific Northwest, USA, salmonid management plans have typically focused on degraded freshwater habitat, dams, fish passage, harvest rates, and hatchery releases. However, such plans inadequately address threats related to human population and economic growth, intra- and interspecific competition, and changes in climate, ocean, and estuarine conditions. Based on reviews conducted on eight conservation and/or recovery plans, we found that though threats resulting from such changes are difficult to model and/or predict, they are especially important for wide-ranging diadromous species. Adaptive management is also a critical but often inadequately constructed component of those plans. Adaptive management should be designed to respond to evolving knowledge about the fish and their supporting ecosystems; if done properly, it should help improve conservation efforts by decreasing uncertainty regarding known and diffuse threats. We conclude with a general call for environmental managers and planners to reinvigorate the adaptive management process in future management plans, including more explicitly identifying critical uncertainties, implementing monitoring programs to reduce those uncertainties, and explicitly stating what management actions will occur when pre-identified trigger points are reached.

  4. Novel alternative to antibiotics in shrimp hatchery: effects of the essential oil of Cinnamosma fragrans on survival and bacterial concentration of Penaeus monodon larvae.

    Science.gov (United States)

    Randrianarivelo, R; Danthu, P; Benoit, C; Ruez, P; Raherimandimby, M; Sarter, S

    2010-08-01

    The activity of two essential oils (EOs) of Cinnamosma fragrans, an endemic plant to Madagascar (B8: linalool-type and B143: 1,8-cineole-type), against bacterial isolates from a shrimp hatchery of Penaeus monodon and their effects on the survival and bacterial concentration of larvae were determined. Minimum inhibitory concentrations were determined using a broth dilution technique. The bacterial concentrations of both larvae and water tank were assessed on Marine agar and Thiosulfate Citrate Bile Sucrose agar. The assays took place in OSO Farming's shrimp hatchery in Madagascar. EOs were directly added to the water tank. Regarding the survival, the assays in larval culture (four replicates each of B8, B143, E and control) showed that B8 oil had a similar effect (P > 0.05) as the antibiotic (Erythromycin) and was more active than B143 (P larvae for all assays. Both C. fragrans essential oils, as antibiotic, exhibited significantly higher survival rates and lower bacterial concentrations of the larvae than the control (oil and antibiotic free). The potential of C. fragrans essential oil to control the bacterial load in in vivo conditions, thereby enhancing survival rate of P. monodon larvae, makes it a relevant option for developing a novel alternative to antibiotics in shrimp hatchery culture.

  5. Retail Tactical Planning: An Aligned Process?

    OpenAIRE

    Dreyer , Heidi; Dukovska-Popovska , Iskra; Kiil , Kasper; Kaipia , Riikka

    2016-01-01

    Part 9: Quality in Production Management; International audience; This paper addresses tactical planning in retailing through a case study approach in one grocery retailing company. The issues are how tactical planning is conducted and how the different plans are connected. The study complements earlier retail planning studies by showing the sequence of planning phases and by studying the fragmented plans as a process. The master category planning is important and sets borders for the other p...

  6. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  7. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  8. Evaluation of partial water reuse systems used for Atlantic salmon smolt production at the White River National Fish Hatchery

    Science.gov (United States)

    Eight of the existing 9.1 m (30 ft) diameter circular culture tanks at the White River National Fish Hatchery in Bethel, Vermont, were retrofitted and plumbed into two 8,000 L/min partial water reuse systems to help meet the region's need for Atlantic salmon (Salmo salar) smolt production. The part...

  9. Mastering jQuery mobile

    CERN Document Server

    Lambert, Chip

    2015-01-01

    You've started down the path of jQuery Mobile, now begin mastering some of jQuery Mobile's higher level topics. Go beyond jQuery Mobile's documentation and master one of the hottest mobile technologies out there. Previous JavaScript and PHP experience can help you get the most out of this book.

  10. Fiscal 2000 survey report. Foundation building project for international energy use rationalization. Master plan preparation for rationalized energy use; 2000 nendo kokusai energy shiyo gorika kiso seibi jigyo chosa hokokusho. Goriteki energy shiyo no tame no master plan sakusei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For energy conservation and environmental protection using technologies for effective consumption of energy and for preventing pollution due to energy consumption, master plans were studied and prepared on photovoltaic power generation, wind power generation, natural gas utilization, and so on, for the Xinjiang Uygur Zizhiqu, Gansu Province, and Guandong Province, respectively. Propositions addressing the Xinjiang Uygur Zizhiqu involved a decrease in dependence on coal, utilization of natural gas, introduction of coal-fired cogeneration systems, introduction of wind power up to the level equivalent to the supply reserve capability, energy conversion and new industry development using natural gas, promotion of electrification of local communities, and so on. Propositions addressing Gansu Province involved the hydroelectric power system as the core of power sources, decrease in dependence on coal, enhanced utilization of natural gas, energy conversion and new industry development utilizing natural gas, and so on. Propositions addressing Guangdong Province involved a decrease in dependence on coal and oil, enhanced utilization of natural gas, introduction of natural gas-fired combined cycle power generation into urban sectors, accelerated utilization of wind power generation on isolated islands, and so on. (NEDO)

  11. Preservation of hatchery waste by lactic acid fermentation. 2. Large-scale fermentation and feeding trial to evaluate feeding value.

    Science.gov (United States)

    Deshmukh, A C; Patterson, P H

    1997-09-01

    Two waste streams from a Leghorn hatchery were preserved and recycled by fermentation with a by-product carbohydrate and extrusion processing into new feed ingredients that were evaluated with broiler chickens. Cockerel chicks (CC) and a 60:40 ratio of CC:shell waste (CC:SW) were fermented in 189-L barrels for 21 d following grinding, then mixing with a liquid culture (0.2%) and carbohydrate source at 15 and 16.66%, respectively. At 2 wk, pH was 4.44 and 5.09 for the CC and CC:SW products compared with higher values of 6.54 and 6.98 for the raw ingredients at the onset. Negligible hydrogen sulfide and no ammonia gas were recorded during the fermentation period. At 21 d, the fermented CC and CC:SW were extruded, dried, and ground to meals containing CP and TMEn levels of 47.4%, 3,187 kcal/kg, and 33.1%, 2,696 kcal/kg, respectively. Broiler chickens were fed a control diet and the CC (5 and 10%) and CC:SW (2.5 and 5%) ingredient diets with corn and soybean meal for 6 wk to evaluate feeding value and carcass yield. Body weight, gain and feed conversion at 42 d for birds fed diets supplemented with CC or CC:SW at all levels were comparable to those of the control. Diets supplemented with hatchery by-product had no negative effect on carcass measurements except ready to cook carcass and wing yield, which were significantly greater for the 10% CC:SW birds than for the control. These data indicate that nutrient dense hatchery by-products can be preserved with fermentation up to 21 d and support broiler live performance and carcass yield as dietary ingredients equal to or better than a corn-soybean meal control.

  12. Hatchery production of European lobster (Homarus gammarus, L.: broodstock management and effects of different holding systems on larval survival

    Directory of Open Access Journals (Sweden)

    Rodolfo Ballestrazzi

    2010-01-01

    Full Text Available The biometry of wild berried females was collected during an entire reproductive season at the South-Wexford Lobster Co-op hatchery in Nethertown, Ireland. Second degree regressions between total body weight (TW, g and carapace length (CL, mm (TW=CL2 -36.675CL+1793.2, R2=0.9022 and number of “weaned” larvae and carapace length (Larvae number=1.217CL2–21.777CL-5281.1, R2 =0.743 were observed. Afterwards, berried females were divided according to two variables: 1. holding system: recirculating system (Rs vs barrel (Bar; 2. CL size: 120 mm (C. The total weight of larvae (212.5 vs 92.4 g and their numbers (7788 vs 5679 were significantly higher for the largest females than for the smaller sizes (P<0.01. The maximum survival rate of larvae (77.86% was noted for initial stocking density <1000 individuals/hopper, but the optimal stocking density for management purposes in the hatchery is higher (2001-3000 individuals/hopper.

  13. Sustainable Planning Approaches for Water Resources: Case Studies

    OpenAIRE

    Samuel, Asumadu-Sarkodie

    2017-01-01

    Lake Okeechobee, Florida Louisiana's Comprehensive Master Plan for a Sustainable Coast Restoration Planning Process for the Gulf Coast. This record was migrated from the OpenDepot repository service in June, 2017 before shutting down.

  14. Gene expression variations: potentialities of master regulator polymorphisms in colorectal cancer risk

    Czech Academy of Sciences Publication Activity Database

    Pardini, Barbara; Naccarati, Alessio; Vodička, Pavel (ed.); Kumar, R.

    2012-01-01

    Roč. 27, č. 2 (2012), s. 161-167 ISSN 0267-8357 R&D Projects: GA ČR GP305/09/P194; GA ČR GAP304/10/1286 Institutional research plan: CEZ:AV0Z50390512 Keywords : master regulators of transcrition * genome-wide association studies (GWAS) * colorectal cancer Subject RIV: EB - Genetics ; Molecular Biology Impact factor: 3.500, year: 2012

  15. Salmon and steelhead in the White Salmon River after the removal of Condit Dam–Planning efforts and recolonization results

    Science.gov (United States)

    Allen, Brady; Engle, Rod O; Zendt, Joseph S; Shrier, Frank C; Wilson, Jeremy T; Connolly, Patrick J.

    2016-01-01

    Condit Dam, at river kilometer 5.3 on the White Salmon River, Washington, was breached in 2011 and completely removed in 2012. This action opened habitat to migratory fish for the first time in 100 years. The White Salmon Working Group was formed to create plans for fish salvage in preparation for fish recolonization and to prescribe the actions necessary to restore anadromous salmonid populations in the White Salmon River after Condit Dam removal. Studies conducted by work group members and others served to inform management decisions. Management options for individual species were considered, including natural recolonization, introduction of a neighboring stock, hatchery supplementation, and monitoring natural recolonization for some time period to assess the need for hatchery supplementation. Monitoring to date indicates that multiple species and stocks of anadromous salmonids are finding and spawning in the now accessible and recovering habitat.

  16. 46 CFR 154.1816 - Cargo location plan.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo location plan. 154.1816 Section 154.1816 Shipping... FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Operations § 154.1816 Cargo location plan. The master shall ensure that: (a) A cargo location plan is prepared that gives: (1) The location and...

  17. Developing an interdisciplinary certificate program in transportation planning.

    Science.gov (United States)

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  18. GENETIC DIVERSITY OF Vibrio harveyi ISOLATED FROM TIGER PRAWN Penaeus monodon HATCHERIES AND GROW OUT PONDS

    OpenAIRE

    Muliani Muliani; Ince Ayu Khairana Kadriah; Andi Parenrengi; Sulaeman Sulaeman

    2006-01-01

    ibrio harveyi is known as one among the most harmful bacteria infecting tiger prawn at every stage of its life’s. The present research was aimed to reveal the genetic diversity of Vibrio harveyi isolated from tiger prawn (Penaeus monodon) culture. The samples of bacteria were collected from hatchery (brood-stock, larvae, natural feed, artemia, and larval rearing water) and grow-out (juveniles, water, shrimp, sediment, plankton, crab, mollusc, microalgae, and wild fish).  The taxonomic identif...

  19. CAREER INTENTIONS OF INTERNATIONAL MASTER STUDENTS IN HOSPITALITY AND TOURISM MANAGEMENT

    OpenAIRE

    Li, Wenjun

    2014-01-01

    The purpose of this qualitative study was to investigate career intentions of international master's students in hospitality and tourism management (HTM) in the United States. Semi-structured interviews were conducted with a sample of 19 participants at two different U.S. institutions. Interview questions were designed to better understand students' career intentions upon graduation and the determinants behind the plans. Results indicated that student's career intention should include measure...

  20. On the precise connection between the GRW master equation and master equations for the description of decoherence

    Energy Technology Data Exchange (ETDEWEB)

    Vacchini, Bassano [Dipartimento di Fisica dell' Universita di Milano, Via Celoria 16, 20133 Milan (Italy); Istituto Nazionale di Fisica Nucleare, sezione di Milano, Via Celoria 16, 20133 Milan (Italy)

    2007-03-09

    We point out that the celebrated GRW master equation is invariant under translations, reflecting the homogeneity of space, thus providing a particular realization of a general class of translation-covariant Markovian master equations. Such master equations are typically used for the description of decoherence due to momentum transfers between the system and environment. Building on this analogy we show the exact relationship between the GRW master equation and decoherence master equations, further providing a collisional decoherence model formally equivalent to the GRW master equation. This allows for a direct comparison of order of magnitudes of relevant parameters. This formal analogy should not lead to confusion on the utterly different spirit of the two research fields, in particular it has to be stressed that the decoherence approach does not lead to a solution of the measurement problem. Building on this analogy however the feasibility of the extension of spontaneous localization models in order to avoid the infinite energy growth is discussed. Apart from a particular case considered in the paper, it appears that the amplification mechanism is generally spoiled by such modifications.

  1. Asotin Creek model watershed plan: Asotin County, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    The Northwest Power Planning Council completed its ''Strategy for Salmon'' in 1992. This is a plan, composed of four specific elements,designed to double the present production of 2.5 million salmon in the Columbia River watershed. These elements have been called the ''four H's'': (1) improve harvest management; (2) improve hatcheries and their production practices; (3) improve survival at hydroelectric dams; and (4) improve and protect fish habitat. The Asotin Creek Model Watershed Plan is the first to be developed in Washington State which is specifically concerned with habitat protection and restoration for salmon and trout. The plan is consistent with the habitat element of the ''Strategy for Salmon''. Asotin Creek is similar in many ways to other salmon-bearing streams in the Snake River system. Its watershed has been significantly impacted by human activities and catastrophic natural events, such as floods and droughts. It supports only remnant salmon and trout populations compared to earlier years. It will require protection and restoration of its fish habitat and riparian corridor in order to increase its salmonid productivity

  2. Present condition and theme of the planning standards of parks and open space planning. Koen ryokuchi keikaku gijutsu hyojun no genjo to kadai

    Energy Technology Data Exchange (ETDEWEB)

    Takanashi, M. (Kanagawa Prefectural Government, Kanagawa (Japan))

    1992-08-06

    With the dramatic progress of urbanization, the rapid decrease of the green area and the open space, which is basis for ensuring the safety and the comfort of city life and formation of a good city environment, lead to the worsen of city environment. For the basic purpose of achieving the harmony between development and environment by considering the preservation of the green area and the open space, the green master plan is a representative example, and was made as the constitution of from a ground plan to the various plans such as region, city and nation based on the space unit of developing the human action. One of the important planning approach for the green area plan from conception to implementation is the planning standards of park and open space planning. This paper introduced the change of the system about the planning standards of park and open space planning, and explained necessarily the present state of greens master plan about preservation of the national environment and adjustment the park and open space. 1tab.

  3. Master-slave micromanipulator method

    Energy Technology Data Exchange (ETDEWEB)

    Morimoto, A.K.; Kozlowski, D.M.; Charles, S.T.; Spalding, J.A.

    1999-12-14

    A method is disclosed based on precision X-Y stages that are stacked. Attached to arms projecting from each X-Y stage are a set of two axis gimbals. Attached to the gimbals is a rod, which provides motion along the axis of the rod and rotation around its axis. A dual-planar apparatus that provides six degrees of freedom of motion precise to within microns of motion. Precision linear stages along with precision linear motors, encoders, and controls provide a robotics system. The motors can be remotized by incorporating a set of bellows on the motors and can be connected through a computer controller that will allow one to be a master and the other one to be a slave. Position information from the master can be used to control the slave. Forces of interaction of the slave with its environment can be reflected back to the motor control of the master to provide a sense of force sensed by the slave. Forces import onto the master by the operator can be fed back into the control of the slave to reduce the forces required to move it.

  4. Dispersal and survival of stocked juvenile hatchery-reared Atlantic sturgeon (Acipenser oxyrinchus

    Directory of Open Access Journals (Sweden)

    Kapusta Andrzej

    2016-12-01

    Full Text Available The post-stocking dispersal of juvenile Atlantic sturgeon (Acipenser oxyrinchus Mitchill in the Wis3oka River (southern Poland was investigated using biotelemetry. Thirty-five hatchery-reared juvenile A. oxyrinchus were tagged with radio or acoustic transmitters and tracked using mobile surveys and fixed receivers. Daily movement patterns were similar in 2009 and 2010. The sturgeon migrated with a mean speed of 1.42 km h-1 in 2009 and of 2.06 km h-1 in 2010. Migration rate was not regarded as being dependent on juvenile sturgeon size. The confirmed survival of individuals from the two field seasons differed slightly over the course of this study. Short-term survival of A. oxyrinchus was 86.7 and 90% in 2009 and 2010, respectively.

  5. A Planning Guide for Instructional Networks, Part I.

    Science.gov (United States)

    Daly, Kevin F.

    1994-01-01

    Discusses three phases in implementing a master plan for a school-based local area network (LAN): (1) network software selection; (2) hardware selection, network topology, and site preparation; and (3) implementation time table. Sample planning and specification worksheets and a list of planning guides are included. (Contains six references.) (KRN)

  6. From convolutionless generalized master to Pauli master equations

    International Nuclear Information System (INIS)

    Capek, V.

    1995-01-01

    The paper is a continuation of previous work within which it has been proved that time integrals of memory function (i.e. Markovian transfer rates from Pauli Master Equations, PME) in Time-Convolution Generalized Master Equations (TC-GME) for probabilities of finding a state of an asymmetric system interacting with a bath with a continuous spectrum are exactly zero, provided that no approximation is involved, irrespective of the usual finite-perturbation-order correspondence with the Golden Rule transition rates. In this paper, attention is paid to an alternative way of deriving the rigorous PME from the TCL-GME. Arguments are given in favor of the proposition that the long-time limit of coefficients in TCL-GME for the above probabilities, under the same assumption and presuming that this limit exists, is equal to zero. 11 refs

  7. EPOS IP - Data, Data Products, Services and Software (DDSS Master Table)

    Science.gov (United States)

    Michalek, Jan; Atakan, Kuvvet

    2017-04-01

    The "European Plate Observing System - Implementation Phase" (EPOS IP, 2014-2019) project is about building a pan-European infrastructure for accessing solid Earth science data. This ambitious plan started in 2002 already with a Conception Phase and continued by an EPOS PP (Preparatory Phase, 2010-2014) where about 20 partners joined the project. The current EPOS IP project includes 47 partners plus 6 associate partners from 25 countries from all over Europe and several international organizations (ORFEUS, EMSC, EUREF). However, the community contributing to the EPOS integration plan is larger than the official partnership of EPOS IP project, because more countries are represented by the international organizations and because within each country there are several research institutions involved. The list of Data, Data Products, Services and Software (DDSS) provided by individual institutions, consortia or organizations which will become part of the EPOS system are currently collected in document called DDSS Master Table. There are 10 work packages (WP8-WP17) creating the Thematic Core Services (TCS) always grouped by a specific topic: Seismology, Near Fault Observatories, GNSS Data and Products, Volcano Observations, Satellite Data, Geomagnetic Observations, Anthropogenic Hazards, Geological Information and Modelling, Multi-scale laboratories and Geo-Energy Test Beds for Low Carbon Energy. Each of this group declared a list of DDSS elements which are about to be implemented. Currently there are about 455 DDSS elements in the DDSS Master Table. These DDSS elements are of different maturity and about 122 are declared by TCS groups to be ready for implementation which means that the data are well described with metadata, following the standards specific for their domain and, in the best case, with some services allowing their access already. The DDSS elements differ by its complexity as well. The DDSS Master Table serves as an overview of the DDSS elements and

  8. Put in value of the Santa Teresa Park as a cultural landscape. Project and Ordinance of the Landscape in the General Guidelines of its Master Plan

    Directory of Open Access Journals (Sweden)

    Nair Rosana Sommaruga Montiel

    2018-03-01

    Full Text Available The paper is a summary of the landscape studies developed in the framework of 'Lineamientos generales para el Plan Director del Parque Santa Teresa' (General guidelines for Santa Teresa Park Master Plan, agreement made between the Ministry of Tourism, and the Faculty of Architecture, Design And Urbanism of the University of the Republic between August 2015 and July 2016. The purpose of the Convention is to position the Santa Teresa Park as a "model park" for Uruguay, putting in value its patrimonial, landscape and Environmental characteristics, thus contributing to its tourism and sociocultural promotion. The entire project includes and combines different disciplinary studies as well as external contributions. The Research program “Landscape and Public Space” from the Institute of Design in collaboration with VIDIALAB develops the Characterization and Landscape Assessment of the Park, through studies and proposals on its landscape structures, sociocultural perceptions and the qualification of the visual landscape.

  9. La "capacidad vial" del plan regulador chileno, ¿es lo suficientemente buena para dar forma a un entorno edificado sostenible?/ The "road capacity" of the chilean master plan is it good enough for shaping a sustainable built environment?

    Directory of Open Access Journals (Sweden)

    Cárdenas Jirón, Luz Alicia

    2000-03-01

    Full Text Available The "road capacity" of the Chilean Master Plan is a tool developed to measure the capacity of streets in terms of supporting the size of vehicle flow. This tool considers topics such as land use, population density and street width. The purpose of this technique is to incorporate it to the Master Plan, as a town planning instrument, so as to cope with traffic forecasting and congestion. However, the technique does not embrace any sustainability concept, this is due to a disregard of any district ´s social or environmental needs. Therefore a sustainable urban development would doubtfully be reached. It is argued that some other approaches are required for shaping a sustainable built environment in which it is understood that the streets are a public space for people rather than a platform for moving vehicles only. This means, to promote accessibility as well as mobility. In this paper the author reviews borrowed concepts such as "carrying capacity" and "environmental capacity" from bioregionalist and ecological disciplines using a case study in outskirts of Santiago´s metro area./La "capacidad vial" del Plan Regulador chileno es una herramienta desarrollada para medir la capacidad de las calles en términos de apoyar el tamaño del flujo de vehículos. Esta herramienta considera temas como el uso de la tierra, la densidad de población y ancho de la calle. El propósito de esta técnica es su incorporación al Plan Maestro, como un instrumento de planificación de la ciudad, con el fin de hacer frente a la previsión del tráfico y la congestión. Sin embargo, la técnica no incluye ningún concepto de sostenibilidad. Por lo tanto un desarrollo urbano sostenible dudosamente sería alcanzado. Se argumenta que algunos otros enfoques son necesarios para dar forma a un medio ambiente sostenible integrado, en el que se entiende que las calles son un espacio público para las personas en lugar de una plataforma para mover los vehículos solamente

  10. The evolution of the clear water hatchery system for Macrobrachium rosenbergii in the French West Indies from 1979 to 1984

    OpenAIRE

    Lacroix, Denis; Robin, Thierry; Sica Aquacole De Martinique,; Aquacop,

    1985-01-01

    The clearwater larval rearing method for Macrobrachium rosenbergii was perfected in the french research center of Tahiti in 1977 nad carried on to improve the technique especially on recirculating system. This aquaculture is launched in Martinique by the regional council in 1976. A first "green water" hatchery is built and provides juveniles to the first ponds.

  11. EVALUATION OF THE MASTER MARKETER NEWSLETTER

    OpenAIRE

    McCorkle, Dean A.; Waller, Mark L.; Amosson, Stephen H.; Smith, Jackie; Bevers, Stanley J.; Borchardt, Robert

    2001-01-01

    Several support programs have been developed to help support, reinforce, enhance, and improve the effectiveness of the educational experience of Master Marketer graduates and other marketing club participants. One of those products, the Master Marketer Newsletter, is currently mailed to over 700 Master Marketer graduates and Extension faculty on a quarterly basis. In the June 2000 newsletter, a questionnaire was sent to newsletter recipients asking them to evaluate the various sections of the...

  12. An LNS Approach for Container Stowage Multi-port Master Planning

    DEFF Research Database (Denmark)

    Pacino, Dario

    2013-01-01

    The generation of competitive stowage plans have become a priority for the shipping industry. Stowage planning is NP-hard and is a challenging optimization problem in practice. Two-phase decomposition approaches have proved to give viable solutions. We propose a large neighborhood search (LNS) to...

  13. Metodología para elaborar el Plan Maestro de Validación de los procesos de producción del Centro Nacional de Sanidad Agropecuaria Methodology to design the Master Plan of Validation of production processes of National Center of Agricultural Health

    Directory of Open Access Journals (Sweden)

    Nivian Montes de Oca

    2010-06-01

    Full Text Available La metodología para la elaboración del Plan Maestro de Validación de los procesos de producción del Centro Nacional de Sanidad Agropecuaria, se diseñó a partir de los requisitos contenidos en la Regulación 16 del 2006 de Buenas Prácticas de Fabricación de medicamentos. Abarcó la política de la organización para la actividad de validación su estructura organizativa, las instalaciones, sistemas, equipos y procesos que se deben validar; el formato de la documentación a utilizar; la planificación y calendario de cada actividad; los resultados de cada protocolo ejecutado, el control de los cambios que se generan; un resumen de las validaciones anteriores; cumplimiento del plan propuesto; las conclusiones donde se precisan de forma resumida si los procesos validados están bajo control, los resultados más relevantes, así como las acciones correctivas y preventivas a tomar; por último se define la distribución de toda la información generada, conformando así el Plan Maestro de Validación. Este sistema de validación se muestra a través de procedimientos, protocolos y registros aplicados en el proceso de fabricación de Surfacen®, medicamento para uso humano que se fabrica en el Centro Nacional de Sanidad Agropecuaria.The methodology to design the Validation Master Plan the production processes of National Center of Agricultural Health was created from the requirements present in the Regulation 16, 2006 of Good Practices of drugs manufacture including the organization policy for validation activity of its organizing structure, installations, systems, equipments and processes to be validated, documentation format used, planning and calendar of each activity; the results from each protocol performed, the generating changes control, abstract of prior validations, fulfillment of proposed plan, conclusions where are determined in a summarized way if the validated processes are under control, the more relevant results, as well as how

  14. Master-slave type manipulator

    International Nuclear Information System (INIS)

    Haaker, L.W.; Jelatis, D.G.

    1979-01-01

    Remote control manipulator of the master-slave type for carrying out work on the other side of a shield wall. This appliance allows a Y movement relative displacement, the function of which is to extend the range of the manipulator towards the front and also to facilitate its installation, the lateral rotation or inclination of the slave arm in relation to the master arm, and the Z movement extension through which the length of the slave arm is increased in comparison with that of the master arm. Devices have been developed which transform the linear movements into rotational movements to enable these movements to be transmitted through rotational seal fittings capable of ensuring the safety of the separation between the operator's environment and that in the work area. Particular improvements have been made to the handles, handle seals, pincer mechanisms, etc [fr

  15. Genetic variation within and among Danish brown trout ( Salmo trutta L) hatchery strains, assessed by PCR-RFLP analysis of mitochondrial DNA segments

    DEFF Research Database (Denmark)

    Hansen, Michael Møller; Mensberg, Karen-Lise Dons; Rasmussen, Gorm

    1997-01-01

    Eleven Danish brown trout hatchery strains were studied by PCR- RFLP analysis of the ND-I and ND-5/6 segments of the mitochondrial genome. For comparison, data from wild trout representing three Danish river systems also were included. Reduced variability in terms of nucleon diversity and number...

  16. Kokanee Stock Status and Contribution of Cabinet Gorge Hatchery, Lake Pend Oreille, Idaho, 1986 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bowles, Edward C.

    1987-02-01

    Estimated kokanee (Oncorhynchus nerka) abundance in Lake Pend Oreille was 4.3 million during September 1986. This estimate was similar to 1985 and indicates continued suppression of the kokanee population since initial decline in the late 1960s. Atypically high survival of wild fry resulted in similar fry recruitment in 1986 as 1985, whereas hatchery-reared fry contributed only 8% to total fry recruitment as a result of low post-release survival (3%). Fry released into the Clark Fork River from Cabinet Gorge Hatchery had very low survival during emigration to Lake Pend Oreille, resulting from poor flow conditions and potentially high predation. Fry survival during emigration was twice as high during nighttime flows of 16,000 cfs than 7,800 cfs. Emigration also was faster during higher flows. Several marks were tested to differentially mark fry release groups to help determine impacts of flow and other factors on fry survival. Survival of fry marked with tetracycline and fluorescent dye was high (>99%) during the 10-week study. In contrast, survival of fry marked with fluorescent grit marks ranged from 5 to 93%, depending on application pressure and distance from the fry. Retention was high (>96%) for tetracycline and grit marks during the study, whereas dye marks were discernible (100%) for only one week. 23 refs., 20 figs., 10 tabs.

  17. Employing mobile media technologies as a participatory planning tool in the suburban housing estate

    DEFF Research Database (Denmark)

    Andersson, Lasse; Knudsen, Anne-Marie Sanvig

    2013-01-01

    an on-going process, informed by mobile citizen generated information loops (open-source), the aim was to move beyond the master plan as a detached expert-driven product and towards an instant master planning process. In order to explore this iterative take on the planning process the research team...... and consulting firm employed mobile media technologies as a tool for creating new forms of citizen engagement. Based on the lessons learned from the research and development project we conclude by looking at what mobile media technologies afforded this planning process and what these experiences might add...

  18. A way to the Photo Master Expert

    Science.gov (United States)

    Inagaki, Toshihiko

    After the author presided over the photographer's group for 15 years or more, the author met with the Photo Master certificate examination. And the author took the certificate examination, and was authorized as a Photo Master Expert in 2005. In this report, the outline how photographic technology has been mastered in order to adapt the photographer's group to the great change of photography from film to digital and how the contents of the activity of a photographer's group have changed is described. And the progress which took the Photo Master certificate examination as a good opportunity to prove the achievement level of those activities is described. And as a photographic activity after Photo Master Expert authorization, the shooting method of mural painting in the royal tomb of Amenophis III is described.

  19. A reactive decision-making approach to reduce instability in a Master Production Schedule

    OpenAIRE

    Herrera , Carlos; Belmokhtar Berraf , Sana; Thomas , André; Parada , Victor

    2016-01-01

    International audience; One of the primary factors that impact the master production scheduling performance is demand fluctuation, which leads to frequently updated decisions, thereby causing instability. Consequently, global cost deteriorates, and productivity decreases. A reactive approach based on parametric mixed-integer programming is proposed that aims to provide a set of plans such that a compromise between production cost and production stability is ensured. Several stability measures...

  20. Comparing the Reproductive Success of Yakima River Hatchery and Wild-Origin Spring Chinook; Yakima/Klickitat Fisheries Project Monitoring and Evaluation Report 4 of 7, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schroder, S.L. (Washington Department of Fish and Wildlife, Olympia, WA); Knudsen, C.M. (Oncorh Consulting, Olympia, WA); Watson, B.D. (Yakama Nation, Toppenish, WA)

    2004-05-01

    In September of 2003, twenty-nine hatchery and twenty-eight wild spring chinook adults were placed into the observation stream located at the Cle Elum Supplementation Research Facility. In, addition 20 precocious males, 7 hatchery and 13 wild, were simultaneously released into the structure. As in previous years, the fish had small amounts of fin material removed prior to being introduced into the stream so that microsatellite DNA based pedigree analyses could be performed on their subsequent progeny. The entire 127 m long by 7.9 m wide stream was made available to this group of fish. Continuous behavioral observations were made while the females prepared nests and spawned. Moreover, standard measurements of adult longevity, spawning participation, water velocity, redd sizes, gravel composition, water temperature and flow were taken. Fry produced from these fish started to emigrate from the stream in early January 2004. They were trapped and sub-sampled for later microsatellite DNA analyses. In mid May of 2004 fry emergence from the channel was complete and residual fish were captured by seine and electro-fishing so that the entire juvenile population could be proportionately sampled. Audiotape records of the behavior of wild and hatchery adults spawning in the observation stream in 2001 were transcribed into continuous ethograms. Courting, agonistic, and location data were extracted from these chronological records and analyzed to characterize the reproductive behavior of both hatchery and wild fish. In addition, a ''gold standard'' pedigree analysis was completed on the fry originating from the adults placed into the observation stream in 2001. Behavioral and morphological data collected on hatchery and wild males were linked to the results of the pedigree analysis to ascertain what factors affected their reproductive success (RS) or capacity to produce fry. Individual RS values were calculated for each male placed into the observation stream

  1. 21 CFR 314.420 - Drug master files.

    Science.gov (United States)

    2010-04-01

    ... the context of an application under part 312 or this part. A drug master file may contain information... incorporate by reference all or part of the contents of any drug master file in support of the submission if... information in a drug master file (except the list required under paragraph (d) of this section) is required...

  2. [Research in the Master's Degree program in Social Medicine].

    Science.gov (United States)

    Laurell, C; Mercer, H

    1981-01-01

    The authors report on research as part of the master's degree in social medicine at the Metropolitan Autonomous University, Xochimilco campus, Mexico. They discuss research within the curriculum design, instructional research, teaching staff and research, and research as a source of knowledge. They explain that in order to establish guidelines for research it is necessary to consider the health-disease process and medical practice within the economic and social framework and therefore subject to analysis by the social sciences. Finally, they summarize ongoing research in the fields of social epidemiology, medical practice and planning, and human resources.

  3. Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for Single-Shell Tank (SST) Waste Management Areas

    International Nuclear Information System (INIS)

    MCCARTHY, M.M.

    1999-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly

  4. Master plan of Mizunami underground research laboratory

    International Nuclear Information System (INIS)

    1999-04-01

    In June 1994, the Atomic Energy Commission of Japan reformulated the Long-Term Programme for Research, Development and Utilisation of Nuclear Energy (LTP). The LTP (item 7, chapter 3) sets out the guidelines which apply to promoting scientific studies of the deep geological environment, with a view to providing a sound basis for research and development programmes for geological disposal projects. The Japan Nuclear Cycle Development Institute (JNC) has been conducting scientific studies of the deep geological environment as part of its Geoscientific Research Programme. The LTP also emphasised the importance of deep underground research facilities in the following terms: Deep underground research facilities play an important role in research relating to geological disposal. They allow the characteristics and features of the geological environment, which require to be considered in performance assessment of disposal systems, to be investigated in situ and the reliability of the models used for evaluating system performance to be developed and refined. They also provide opportunities for carrying out comprehensive research that will contribute to an improved overall understanding of Japan's deep geological environment. It is recommended that more than one facility should be constructed, considering the range of characteristics and features of Japan's geology and other relevant factors. It is important to plan underground research facilities on the basis of results obtained from research and development work already carried out, particularly the results of scientific studies of the deep geological environment. Such a plan for underground research facilities should be clearly separated from the development of an actual repository. JNC's Mizunami underground research laboratory (MIU) Project will be a deep underground research facility as foreseen by the above provisions of the LTP. (author)

  5. MASTER OF THE SHIP, MANAGER AND INSTRUCTOR

    Directory of Open Access Journals (Sweden)

    Florin IORDANOAIA

    2010-01-01

    Full Text Available The master of the ship is the person on the board who has the qualification and the necessary certificate of competency for running a maritime transport ship. He is the one who takes the ship into administration from the ship-owner, he is the only leader, the legal and direct chief of the entire crew, being invested with authority upon all the members of the crew. The master fulfils the attributes and displays his activity according to the legal laws of his flag, of the marine regulations and of the international conventions. In all the relationships which he establishes with physical or juridical people, the master represents the ship-owner, in a double condition, as an officer and as a commercial manager. In this paper, it is analysed the situation of the ship masters, the relationships which these masters have with the crew and the problems which appear during their voyage. At the end of the paper there are proposed measures to increase the quality of the training of the ship masters, to solve the situations connected with the members of the crew.

  6. Idea Notebook: Wilderness Food Planning in the Computer Age.

    Science.gov (United States)

    Drury, Jack K.

    1986-01-01

    Explains the use of a computer as a planning and teaching tool in wilderness trip food planning. Details use of master food list and spreadsheet software such as VisiCalc to provide shopping lists for food purchasing, cost analysis, and diet analysis. (NEC)

  7. Dual arm master controller for a bilateral servo-manipulator

    Science.gov (United States)

    Kuban, Daniel P.; Perkins, Gerald S.

    1989-01-01

    A master controller for a mechanically dissimilar bilateral slave servo-manipulator is disclosed. The master controller includes a plurality of drive trains comprising a plurality of sheave arrangements and cables for controlling upper and lower degrees of master movement. The cables and sheaves of the master controller are arranged to effect kinematic duplication of the slave servo-manipulator, despite mechanical differences therebetween. A method for kinematically matching a master controller to a slave servo-manipulator is also disclosed.

  8. Estimation of the groundwater resources of the bedrock aquifers at the Kettle Moraine Springs State Fish Hatchery, Sheboygan County, Wisconsin

    Science.gov (United States)

    Dunning, Charles; Feinstein, Daniel T.; Buchwald, Cheryl A.; Hunt, Randall J.; Haserodt, Megan J.

    2017-10-12

    Groundwater resources information was needed to understand regional aquifer systems and water available to wells and springs for rearing important Lake Michigan fish species at the Kettle Moraine Springs State Fish Hatchery in Sheboygan County, Wisconsin. As a basis for estimating the groundwater resources available, an existing groundwater-flow model was refined, and new groundwater-flow models were developed for the Kettle Moraine Springs State Fish Hatchery area using the U.S. Geological Survey (USGS) finite-difference code MODFLOW. This report describes the origin and construction of these groundwater-flow models and their use in testing conceptual models and simulating the hydrogeologic system.The study area is in the Eastern Ridges and Lowlands geographical province of Wisconsin, and the hatchery property is situated on the southeastern edge of the Kettle Moraine, a north-south trending topographic high of glacial origin. The bedrock units underlying the study area consist of Cambrian, Ordovician, and Silurian units of carbonate and siliciclastic lithology. In the Sheboygan County area, the sedimentary bedrock sequence reaches a thickness of as much as about 1,600 feet (ft).Two aquifer systems are present at the Kettle Moraine Springs State Fish Hatchery. A shallow system is made up of Silurian bedrock, consisting chiefly of dolomite, overlain by unconsolidated Quaternary-age glacial deposits. The glacial deposits of this aquifer system are the typical source of water to local springs, including the springs that have historically supplied the hatchery. The shallow aquifer system, therefore, consists of the unconsolidated glacial aquifer and the underlying bedrock Silurian aquifer. Most residential wells in the area draw from the Silurian aquifer. A deeper confined aquifer system is made up of Cambrian- and Ordovician-age bedrock units including sandstone formations. Because of its depth, very few wells are completed in the Cambrian-Ordovician aquifer system

  9. Evaluation of Urban Planning Projects Criteria Using Fuzzy AHP Technique

    Directory of Open Access Journals (Sweden)

    Walid Mustafa Kamas

    2017-05-01

    Full Text Available In this research, Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP which is one of multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect. The land use criteria are more important than the rest of the criteria in these projects, where it received the relative importance with percentile (42.1 %.

  10. Masterful care of the aging triathlete.

    Science.gov (United States)

    Wright, Vonda J

    2012-12-01

    Current endurance champions are turning in winning performances in their late 30s and 40s. These masters-age athletes present a special challenge to Sport Medicine practitioners who in previous decades have simply advised masters-aged athletes to stop competing to prevent or treat injury. The fact is, many of the physical changes commonly attributed to aging alone are actually due to the rages of sedentary aging. Recently a body of literature emerged which begins to define what we are capable of with chronic high-level exercise and guides masters-age athletes to train and rehab smarter to stay competitive. The factors influencing the relative declines in overall performance in the various sports include both physiological and lifestyle changes. The following review summarizes age and sex-related changes in triathlon performance, the biology of aging as it relates to endurance sport and factors that affect performance in the masters athletes.

  11. Dual arm master controller for a bilateral servo-manipulator

    International Nuclear Information System (INIS)

    Kuban, D.P.; Perkins, G.S.

    1989-01-01

    A master controller for a mechanically dissimilar bilateral slave servo-manipulator is disclosed. The master controller includes a plurality of drive trains comprising a plurality of sheave arrangements and cables for controlling upper and lower degrees of master movement. The cables and sheaves of the master controller are arranged to effect kinematic duplication of the slave servo-manipulator, despite mechanical differences there between. A method for kinematically matching a master controller to a slave servo-manipulator is also disclosed. 13 figs

  12. The value of ancient architecture for educational program of masters of architectural space design

    Directory of Open Access Journals (Sweden)

    Prishchepa Aleksandr

    2017-01-01

    Full Text Available The existence of archaeological sites of ancient Greek colony-towns and medieval fortresses gives a real insight into the interaction of all spheres of human activity in ancient times. Ancient Greek Emporium is a vivid example of the architecture, art, archaeology and urban planning synthesis. Archaeological excavations provide an opportunity to study the artefacts of the ancient world belonging to several fields, such as sculpture, decorative arts, fashion design and household. Studying history of archaeology right on the place of excavation of an ancient city masters can imagine the scale of buildings, streets layout and location of business, administrative and residential buildings. It allows students to form professional way of thinking in a short period in order to gather the material and work on the master thesis.

  13. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  14. Carbon dioxide emissions and the overshoot ratio change resulting from the implementation of 2nd Energy Master Plan in South Korea

    Science.gov (United States)

    Yeo, M. J.; Kim, Y. P.

    2015-12-01

    The direction of the energy policies of the country is important in the projection of environmental impacts of the country. The greenhouse gases (GHGs) emission of the energy sector in South Korea is very huge, about 600 MtCO2e in 2011. Also the carbon footprint due to the energy consumption contributes to the ecological footprint is also large, more than 60%. Based on the official plans (the national greenhouse gases emission reduction target for 2030 (GHG target for 2030) and the 2nd Energy Master Plan (2nd EMP)), several scenarios were proposed and the sensitivity of the GHG emission amount and 'overshoot ratio' which is the ratio of ecological footprint to biocapacity were estimated. It was found that to meet the GHG target for 2030 the ratio of non-emission energy for power generation should be over 71% which would be very difficult. We also found that the overshoot ratio would increase from 5.9 in 2009 to 7.6 in 2035. Thus, additional efforts are required to reduce the environmental burdens in addition to optimize the power mix configuration. One example is the conversion efficiency in power generation. If the conversion efficiency in power generation rises up 50% from the current level, 40%, the energy demand and resultant carbon dioxide emissions would decrease about 10%. Also the influence on the environment through changes in consumption behavior, for example, the diet choice is expected to be meaningful.

  15. Unmanned Aerial Vehicles Master Plan, 1994. Master Plan.

    Science.gov (United States)

    1994-05-31

    Terminal SINCGARS = Single-Channel Ground and Airborne Radio System Figure 3-5 Maneuver Variant CONOPS I Psychological operations. deployment with early...650 KM DAT M 3 K (300 DESIRED) BEYOND FORWARD LINE OF OWN TROOPS (FLOT) APPROXIMATE RADIUS OF ACTION LEGEND ATARS = Advanced Tactical Air

  16. Asotin Creek Model Watershed Plan: Asotin County, Washington, 1995.

    Energy Technology Data Exchange (ETDEWEB)

    Browne, Dave

    1995-04-01

    The Northwest Power Planning Council completed its ``Strategy for Salmon'' in 1992. This is a plan, composed of four specific elements,designed to double the present production of 2.5 million salmon in the Columbia River watershed. These elements have been called the ``four H's'': (1) improve harvest management; (2) improve hatcheries and their production practices; (3) improve survival at hydroelectric dams; and (4) improve and protect fish habitat. The Asotin Creek Model Watershed Plan is the first to be developed in Washington State which is specifically concerned with habitat protection and restoration for salmon and trout. The plan is consistent with the habitat element of the ``Strategy for Salmon''. Asotin Creek is similar in many ways to other salmon-bearing streams in the Snake River system. Its watershed has been significantly impacted by human activities and catastrophic natural events, such as floods and droughts. It supports only remnant salmon and trout populations compared to earlier years. It will require protection and restoration of its fish habitat and riparian corridor in order to increase its salmonid productivity.

  17. Planning Public Transport

    DEFF Research Database (Denmark)

    Andersen, Jonas Lohmann Elkjær; Landex, Alex

    2009-01-01

    This good practice guide is composed for the master course 13120 Public Transport Planning held at the Department of Transport, Technical University of Denmark. It is intended to use as guide in the different planning aspects and assignments of the course. Since the course is about the planning...... of new public transport infrastructure this guide also focuses on the planning of new infrastructure. Furthermore, the new infrastructure in the course is expected to be a light rail and even though this guide aims at being general for public transport some of the issues evidently become more relevant...... will enable a capability for planning both bus and rail. The guide is build as a full sketch investigation of a new public transport project ranging chronological from project clarification to physical and timetable planning to traffic modeling and project appraisal. The same steps that are expected...

  18. Ensuring Sustainable Development through Urban Planning in Pakistan

    Directory of Open Access Journals (Sweden)

    Mohammad Qasim

    2013-04-01

    Full Text Available Urban planning includes land use management and environmental change. It makes arrangement for community facilities and services. Since, sustainable development has been included as a vital end product of all planning goals it also provides for balanced use of land, housing and transportation and better quality of life. Present urban planning in Pakistan is not ensuring sustainable development in Pakistan. This is tested through the case study of master planning in Rawalpindi and its implementation through housing schemes in Rawalpindi, Pakistan. Large portions of provisions of master plans are not implemented. This paper explains how the urban planning will be made enabled to ensure sustainable development in Pakistan. Six numbers of housing schemes and two squatter settlements have been surveyed through questionnaires, secondary data, the opinions of the experts from related fields and site observations. Amenities and social services at far distance, very less green area, Less quantity and bad quality of water, absence of comprehensive solid waste management and sewage disposal system and nontreatment of solid waste, effluent and sewage, prevalent unhygienic conditions and air and water pollution are the existing factors effecting the sustainability. There is a need to revisit the urban planning and a comprehensive Urban and Environment Planning Law at national level and at provincial level is recommended to enable the urban planning to ensure the sustainable development in Pakistan

  19. Reproductive Ecology of Yakima River Hatchery and Wild Spring Chinook and Juvenile-to-Adult PIT-tag Retention; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Knudsen, Curtis M. (Washington Department of Fish and Wildlife, Olympia, WA)

    2002-11-01

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from Oncorh Consulting to the Washington Department of Fish and Wildlife (WDFW), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning, and (2) summarize results of research that have broader scientific relevance. This is the first in an anticipated series of reports that address reproductive ecological research and monitoring of spring chinook in the Yakima River basin. In addition to within-year comparisons, between-year comparisons will be made to determine if traits of the wild Naches basin control population, the naturally spawning population in the upper Yakima River and the hatchery control population are diverging over time. This annual report summarizes data collected between April 1, 2001 and March 31, 2002. In the future, these data will be compared to previous years to identify general trends and make preliminary comparisons.

  20. Charge Master: Friend or Foe?

    Science.gov (United States)

    Wan, Wenshuai; Itri, Jason

    2016-01-01

    Prices charged for imaging services can be found in the charge master, a catalog of retail list prices for medical goods and services. This article reviews the evolution of reimbursement in the United States and provides a balanced discussion of the factors that influence charge master prices. Reduced payments to hospitals have pressured hospitals to generate additional revenue by increasing charge master prices. An unfortunate consequence is that those least able to pay for health care, the uninsured, are subjected to the highest charges. Yet, differences in pricing also represent an opportunity for radiology practices, which provide imaging services that are larger in scope or superior in quality to promote product differentiation. Physicians, hospital executives, and policy makers need to work together to improve the existing reimbursement system to promote high-quality, low-cost imaging. Copyright © 2016 Mosby, Inc. All rights reserved.

  1. Dual arm master controller development

    Science.gov (United States)

    Kuban, D. P.; Perkins, G. S.

    1985-01-01

    The advanced servomanipulator (ASM) slave was designed with an anthropomorphic stance gear/torque tube power drives, and modular construction. These features resulted in increased inertia, friction, and backlash relative to tape driven manipulators. Studies were performed which addressed to human factor design and performance tradeoffs associated with the corresponding master controller best suited for the ASM. The results of these studies, as well as the conceptual design of the dual arm master controller, are presented.

  2. Control strategy for viral diseases of salmonid fish, flounders and shrimp at hatchery and seed production facility in Japan

    OpenAIRE

    Yoshimizu, Mamoru

    2009-01-01

    Salmonid fish are important species for hatchery reared and released fish. Flounders and shrimp are also important species for seed production and sea-farming in Japan. Viral disease is one of the limitations of successful propagation of these species. Methods currently used to control viral diseases are 1) hygiene and sanitation in facilities, 2) disinfection of rearing and waste water using U. V. irradiation, ozonization and electrolyzation, 3) selection of pathogen-free brood stock by cell...

  3. Improving Flood Management Planning in Thailand | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    According to World Bank estimates, this disaster caused US$46.5 billion in ... This project seeks to improve the Flood Management Master Plan, proposing ... New Dutch-Canadian funding for the Climate and Development Knowledge Network.

  4. Nez Perce Tribal Hatchery Program. Draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-06-01

    Bonneville Power Administration, the Bureau of Indian Affairs, and the Nez Perce Tribe propose a supplementation program to restore chinook salmon to the Clearwater River Subbasin in Idaho. The Clearwater River is a tributary to the Snake River, which empties into the Columbia River. The Nez Perce Tribe would build and operate two central incubation and rearing hatcheries and six satellite facilities. Several environmental issues were identified during scoping: the possibility that the project would fail if mainstem Columbia river juvenile and adult passage problems are not solved; genetic risks to fish listed as endangered or threatened; potential impacts to wild and resident fish stocks because of increased competition for food and space; and water quality. The Proposed Action would affect several important aspects of Nez Perce tribal life, primarily salmon harvest, employment, and fisheries management. Impacts to cultural resources can be avoided so impacts would be low. Soil impacts would be localized and their effects would be local and temporary during construction. Impacts to water quality would be low. Mitigation would be used if impacts to groundwater or surface water are greater than anticipated. No impacts to floodplains are expected. Impacts to all categories of fish range from no to high impacts

  5. The master degree: A critical transition in STEM doctoral education

    Science.gov (United States)

    Lange, Sheila Edwards

    The need to broaden participation in the nation's science, technology, engineering, and mathematics (STEM) undergraduate and graduate programs is currently a matter of national urgency. The small number of women and underrepresented minorities (URM) earning doctoral degrees in STEM is particularly troubling given significant increases in the number of students earning master's degrees since 1990. In the decade between 1990 and 2000, the total number of master's recipients increased by 42%. During this same time period, the number of women earning master's degrees increased by 56%, African Americans increased by 132%, American Indians by 101%, Hispanics by 146%, and Asian Americans by 117% (Syverson, 2003). Growth in underrepresented group education at the master's level raises questions about the relationship between master's and doctoral education. Secondary data analysis of the Survey of Earned Doctorates (SED) was used to examine institutional pathways to the doctorate in STEM disciplines and transitions from master's to doctoral programs by race and gender. While the study revealed no significant gender differences in pathways, compared to White and Asian American students, URM students take significantly different pathways to the doctorate. URM students are significantly more likely to earn the bachelor's, master's, and doctoral degrees at three different institutions. Their path is significantly more likely to include earning a master's degree en route to the doctorate. Further, URM students are more likely to experience transition between the master's and doctoral degrees, and the transitions are not limited to those who earn master's degrees at master's-only institutions. These findings suggest that earning a master's degree is more often a stepping stone to the doctorate for URM students. Master's degree programs, therefore, have the potential to be a valuable resource for policymakers and graduate programs seeking to increase the diversity of URM students

  6. Nutritional Supplement of Hatchery Eggshell Membrane Improves Poultry Performance and Provides Resistance against Endotoxin Stress.

    Science.gov (United States)

    Makkar, S K; Rath, N C; Packialakshmi, B; Zhou, Z Y; Huff, G R; Donoghue, A M

    2016-01-01

    Eggshells are significant part of hatchery waste which consist of calcium carbonate crust, membranes, and proteins and peptides of embryonic origins along with other entrapped contaminants including microbes. We hypothesized that using this product as a nutritional additive in poultry diet may confer better immunity to the chickens in the paradigm of mammalian milk that enhances immunity. Therefore, we investigated the effect of hatchery eggshell membranes (HESM) as a short term feed supplement on growth performance and immunity of chickens under bacterial lipopolysaccharide (LPS) challenged condition. Three studies were conducted to find the effect of HESM supplement on post hatch chickens. In the first study, the chickens were fed either a control diet or diets containing 0.5% whey protein or HESM as supplement and evaluated at 5 weeks of age using growth, hematology, clinical chemistry, plasma immunoglobulins, and corticosterone as variables. The second and third studies were done to compare the effects of LPS on control and HESM fed birds at 5 weeks of age following at 4 and 24 h of treatment where the HESM was also sterilized with ethanol to deplete bacterial factors. HESM supplement caused weight gain in 2 experiments and decreased blood corticosterone concentrations. While LPS caused a significant loss in body weight at 24 h following its administration, the HESM supplemented birds showed significantly less body weight loss compared with the control fed birds. The WBC, heterophil/lymphocyte ratio, and the levels of IgG were low in chickens fed diets with HESM supplement compared with control diet group. LPS challenge increased the expression of pro-inflammatory cytokine gene IL-6 but the HESM fed birds showed its effect curtailed, also, which also, favored the up-regulation of anti-inflammatory genes compared with control diet fed chickens. Post hatch supplementation of HESM appears to improve performance, modulate immunity, and increase resistance of

  7. Savannah River Site environmental implementation plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  8. Marketing plan for company X

    OpenAIRE

    Trishkina, Olga

    2014-01-01

    The aim of this master´s thesis is to make a structured marketing plan for company X, which provide tourism services in Finland. The thesis is done with qualitative method, which is the most suitable for marketing research, because it is mostly analyzing and description rather than statistical or numerical reports. In the theoretical part is studied secondary data of the topic, including research about marketing, marketing plan, customer relationship management, customers´ satisfaction a...

  9. Master in ICT and Learning

    DEFF Research Database (Denmark)

    Danielsen, Oluf

    2004-01-01

    The Master in ICT and Learning (MIL)was started in 2000, and it is owned in collaboration by five Danish universities. It is an accredited virtual part-time 2-year education. MIL is unique in that it builds on the pedagogical framework of project pedagogy and is based in virtual collaboration....... It is organized around ICT and Learning. This is illustrated through a presentation of the study program, the four modules, the projects and the master thesis....

  10. TMS320C31 master

    International Nuclear Information System (INIS)

    Yun, Deok Yong

    1999-06-01

    The contents of this book are explanation of basic conception for DSP, perfect a complete master of TMS320C31, I/O interface design and memory, practice with PC print port, basic programing skill, assembly and C programing technique, timer and interrupt application skill, serial communication programing technique, application of digital conditioning and application of digital servo control. This book is divided into two parts, which is about TMS320C31 master of theory and application.

  11. Ankara Historic City Centre Restoration Site Conservation Plan, its Characteristics, and Rationales for its Revocation

    Directory of Open Access Journals (Sweden)

    Mehmet Tuncer

    2013-12-01

    Full Text Available This is a comprehensive evaluation of the 1: 5000 Ankara Historic City Centre Restoration Site Conservation Master Development Plan and the 1: 1000 Conservation Implementation Plans, which have become a matter of litigation against the Ankara Metropolitan Municipality, filed by various non-governmental organizations, universities, the Union of Chambers of Turkish Architects and Engineers (TMMOB and public institutions; in terms of the environment, transportation and traffic as regards the entirety of the planned location, and the integrity of the plan, based on conservation-reclamation planning essentials and public interest. Thus the Ulus Ankara Historic City Centre Restoration Site Conservation Master Development and Implementation Plan and Plan Notes as ratified by the Ankara Metropolitan Municipality and Conservation Board, are examined in this context in terms of restoration site, protected site, conservation site, interaction and transition sites and historic and cultural properties.

  12. Impact of genetically improved fish species and technology on selected hatchery and fish production in Bangladesh

    Directory of Open Access Journals (Sweden)

    MS Islam

    2017-06-01

    Full Text Available The study was carried out in IAPP commanding areas from July to September 2015. A total of 8 hatchery and 240 farmers were selected for this study from Rangpur and Barisal region. About 153% Tilapia production increased which was from 34 to 86 lakh, which was 148% in Rangpur district. Thai koi production was increased about 320% in Rangpur and it was 152% in Barisal. It was observed that, per hatchery Tilapia profit was Tk. 17.35 lakh and Tk. 17.18 lakh in Rangpur and Barisal, respectively. While, total profit was 3.9 times more for Thai koi in Rangpur and it was about 1.7 times more in Barisal after IAPP-BFRI project implementation. Impact of improved germplasm on grow out system was estimated. Finding shows that before IAPP-BFRI project the average harvesting weight of tilapia fish was 122g but after using IAPP-BFRI germplasm, it increased to 194g in Rangpur district. In case of Thai Koi, the harvesting weight gain was 26% in Rangpur district and it was statistically significant at 1% level. Survey results also show that per acre profit was only Tk.86671 for Tilapia farming before IAPP whereas it was increased to Tk. 234853 after IAPP-BFRI intervention. At the same time, profit from Thai Koi was increased about 189% after IAPPBFRI activities. Similarly, profit was increased about 86% in case of Pangus farming and this positive impact was statistically significant at 1% level. Therefore, it may conclude that, farmers can significantly increase Tilapia, Thai Koi and Pangus production as well as can maximize profit using IAPP technology.

  13. Leadership Profiling of Ocean Going Ship Masters1

    Directory of Open Access Journals (Sweden)

    Ioannis Theotokas

    2014-12-01

    This paper focuses on the ocean going ship Masters and aims at identifying their leadership profiles and understanding their attitudes and reactions in given circumstances. It analyses and discusses the results of a field study of ship officers of different nationalities employed as Masters on board ships of a leading international maritime group. Results of the research reveal that the characteristics and the competencies of ship Masters as identified using the specially developed questionnaire, are compatible with those proposed by situational leadership theories. Ship Masters seem to give priority to the people on board and their needs and try to be supportive in their decisions.

  14. The Consolidated Human Activity Database — Master Version (CHAD-Master) Technical Memorandum

    Science.gov (United States)

    This technical memorandum contains information about the Consolidated Human Activity Database -- Master version, including CHAD contents, inventory of variables: Questionnaire files and Event files, CHAD codes, and references.

  15. Umatilla hatchery satellite facilities operation and maintenance. Annual report 1996

    International Nuclear Information System (INIS)

    Rowan, G.D.

    1997-06-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinook and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996

  16. 21 CFR 225.102 - Master record file and production records.

    Science.gov (United States)

    2010-04-01

    ... or production run of medicated feed to which it pertains. The Master Record File or card shall... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Master record file and production records. 225.102....102 Master record file and production records. (a) The Master Record File provides the complete...

  17. Dual arm master controller concept

    International Nuclear Information System (INIS)

    Kuban, D.P.; Perkins, G.S.

    1984-01-01

    The Advanced Servomanipulator (ASM) slave was designed with an anthropomorphic stance, gear/torque tube power drives, and modular construction. These features resulted in increased inertia, friction, and backlash relative to tape-driven manipulators. Studies were performed which addressed the human factors design and performance trade-offs associated with the corresponding master controller best suited for the ASM. The results of these studies, as well as the conceptual design of the dual arm master controller, are presented. 6 references, 3 figures

  18. Master-slave-manipulator 'EMSM I'

    International Nuclear Information System (INIS)

    Koehler, G.W.; Salaske, M.

    1976-01-01

    A master-slave manipulator with electric force transmission and reflection was developed for the first time in the German Federal Republic. The apparatus belongs to the class of 200 N carrying capacity. It is intended mainly for nuclear purposes and especially for use in large hot cells and also for medium and heavy manipulator vehicles. The most innovations compared with previously known foreign electric master-slave manipulators are two additional possibilities of movement and the electric dead weight compensation. (orig.) [de

  19. Master-slave-manipulator EMSM I

    International Nuclear Information System (INIS)

    Koehler, G.W.; Salaske, M.

    1976-01-01

    A master-slave manipulator with electric force transmission and reflection was developed for the first time in the German Federal Republic. The aparatus belongs to the class of 200 N carrying capacity. It is intended mainly for nuclear purposes and especially for use in large hot cells and also for medium and heavy manipulator vehicles. The most obvious innovations compared with previously known foreign electric master-slave manipulators are two additional possibilities of movement and the electric dead weightcompensation. (orig.) [de

  20. 48 CFR 217.7103 - Master agreements and job orders.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Master agreements and job... SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Master Agreement for Repair and Alteration of Vessels 217.7103 Master agreements and job orders. ...

  1. Acronym master list

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This document is a master list of acronyms and other abbreviations that are used by or could be useful to, the personnel at Los Alamos National Laboratory. Many specialized and well-known abbreviations are not included in this list.

  2. Master in nuclear engineering from the UPC (Master UPC-ENDESA)

    International Nuclear Information System (INIS)

    Batet, L.; Duch, M. A.; Calvino, F.; Val, L. del; Fernandez-Olano, P.

    2011-01-01

    The new Masters in Nuclear Engineering offers the UPC is the result of the confluence of wills and synergies between different units of the Universitat Politecnica de Catalunya (UPC) and Endesa. The paper describes the objectives of the proposal along with the program and the learning methodology.

  3. Prospects and Challenges in the Deliverance of Executive Masters ...

    African Journals Online (AJOL)

    In the recent decade Executive Masters degree programmes have become very popular deliverance in the Tanzanian higher learning institutions. ... Using The Open University of Tanzania as a case study, this article will focus on two programmes, namely; Executive Masters in Business Administration (EMBA) and Masters ...

  4. Collaborative planning of operations in industrial symbiosis

    DEFF Research Database (Denmark)

    Herczeg, Gabor; Akkerman, Renzo

    2014-01-01

    Industrial symbiosis (IS) is cooperation between companies to achieve collective benefits by supplying and reusing industrial waste to substitute virgin resources in production. In this paper, we investigate the IS phenomenon from a supply chain management perspective. We propose a collaborative...... planning model to coordinate master planning of operations of waste suppliers and buyers. Furthermore, we analyze planning decisions related to IS when waste exchange is combined with virgin resource procurement. We demonstrate that conditions of virgin resource procurement affect the economic feasibility...

  5. Master's and doctoral theses in family medicine and their publication output, Suez Canal University, Egypt.

    Science.gov (United States)

    Nour-Eldein, Hebatallah; Mansour, Nadia M; Abdulmajeed, Abdulmajeed A

    2015-01-01

    The completion of a thesis is a significant requirement for both a Master's and a doctorate degree in general practice/family medicine (GP/FM). A postgraduate thesis is a well-planned, time-intensive activity carried out over several years. The quality of the theses can be judged by the proportion of published papers. This study aimed to describe Master's and doctoral theses in family medicine and their publications between 1982 and 2014. GP/FM degree theses were reviewed at the Faculty of Medicine and central Suez Canal libraries. Several characteristics were extracted from each thesis relating to the main researcher, supervisors, themes, and study methods according to predefined criteria. Publications from the theses were described. Over 33 years, 208 theses were completed by 173 GP/FM researchers. The majority of the theses were for Master's degrees (84.1%). Regarding the study design, most of the degree theses were cross-sectional studies (76.9%). The adult population was targeted in 33.7% of research theses. Nonprobability sampling was used in 51%. Rural communities were the setting of research in 43.8%, and primary health center (PHC)-based studies in 59.1%. The "Patient" category exceeded the other categories (28.4%). Publication from theses started in the second decade of research production. Of the degree theses, 21.6% original articles were published. Only 13.3% of articles from theses were published in PubMed-indexed journals. The researcher was first author in 62.2% of published articles. The production of GP/FM theses and their publications are going to increase. Continuous assessment and planning for GP/FM studies are recommended.

  6. Master Console System Monitoring and Control Development

    Science.gov (United States)

    Brooks, Russell A.

    2013-01-01

    The Master Console internship during the spring of 2013 involved the development of firing room displays at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I developed a system health and status display for use by Master Console Operators (MCO) to monitor and verify the integrity of the servers, gateways, network switches, and firewalls used in the firing room.

  7. Transport accident emergency response plan

    International Nuclear Information System (INIS)

    Vallette-Fontaine, M.; Frantz, P.

    1998-01-01

    To comply with the IAEA recommendations for the implementation of an Emergency Response Plan as described in Safety Series 87, Transnucleaire, a company deeply involved in the road and rail transports of the fuel cycle, masters means of Emergency Response in the event of a transport accident. This paper aims at analyzing the solutions adopted for the implementation of an Emergency Response Plan and the development of a technical support and adapted means for the recovery of heavy packagings. (authors)

  8. Mastering Ninject for dependency injection

    CERN Document Server

    Baharestani, Daniel

    2013-01-01

    Mastering Ninject for Dependency Injection teaches you the most powerful concepts of Ninject in a simple and easy-to-understand format using lots of practical examples, diagrams, and illustrations.Mastering Ninject for Dependency Injection is aimed at software developers and architects who wish to create maintainable, extensible, testable, and loosely coupled applications. Since Ninject targets the .NET platform, this book is not suitable for software developers of other platforms. Being familiar with design patterns such as singleton or factory would be beneficial, but no knowledge of depende

  9. Enhanced Master Controller Unit Tester

    Science.gov (United States)

    Benson, Patricia; Johnson, Yvette; Johnson, Brian; Williams, Philip; Burton, Geoffrey; McCoy, Anthony

    2007-01-01

    The Enhanced Master Controller Unit Tester (EMUT) software is a tool for development and testing of software for a master controller (MC) flight computer. The primary function of the EMUT software is to simulate interfaces between the MC computer and external analog and digital circuitry (including other computers) in a rack of equipment to be used in scientific experiments. The simulations span the range of nominal, off-nominal, and erroneous operational conditions, enabling the testing of MC software before all the equipment becomes available.

  10. Quantum trajectories for time-dependent adiabatic master equations

    Science.gov (United States)

    Yip, Ka Wa; Albash, Tameem; Lidar, Daniel A.

    2018-02-01

    We describe a quantum trajectories technique for the unraveling of the quantum adiabatic master equation in Lindblad form. By evolving a complex state vector of dimension N instead of a complex density matrix of dimension N2, simulations of larger system sizes become feasible. The cost of running many trajectories, which is required to recover the master equation evolution, can be minimized by running the trajectories in parallel, making this method suitable for high performance computing clusters. In general, the trajectories method can provide up to a factor N advantage over directly solving the master equation. In special cases where only the expectation values of certain observables are desired, an advantage of up to a factor N2 is possible. We test the method by demonstrating agreement with direct solution of the quantum adiabatic master equation for 8-qubit quantum annealing examples. We also apply the quantum trajectories method to a 16-qubit example originally introduced to demonstrate the role of tunneling in quantum annealing, which is significantly more time consuming to solve directly using the master equation. The quantum trajectories method provides insight into individual quantum jump trajectories and their statistics, thus shedding light on open system quantum adiabatic evolution beyond the master equation.

  11. New Design for Rapid Prototyping of Digital Master Casts for Multiple Dental Implant Restorations.

    Directory of Open Access Journals (Sweden)

    Luis Romero

    Full Text Available This study proposes the replacement of all the physical devices used in the manufacturing of conventional prostheses through the use of digital tools, such as 3D scanners, CAD design software, 3D implants files, rapid prototyping machines or reverse engineering software, in order to develop laboratory work models from which to finish coatings for dental prostheses. Different types of dental prosthetic structures are used, which were adjusted by a non-rotatory threaded fixing system.From a digital process, the relative positions of dental implants, soft tissue and adjacent teeth of edentulous or partially edentulous patients has been captured, and a maser working model which accurately replicates data relating to the patients oral cavity has been through treatment of three-dimensional digital data.Compared with the conventional master cast, the results show a significant cost savings in attachments, as well as an increase in the quality of reproduction and accuracy of the master cast, with the consequent reduction in the number of patient consultation visits. The combination of software and hardware three-dimensional tools allows the optimization of the planning of dental implant-supported rehabilitations protocol, improving the predictability of clinical treatments and the production cost savings of master casts for restorations upon implants.

  12. New Design for Rapid Prototyping of Digital Master Casts for Multiple Dental Implant Restorations.

    Science.gov (United States)

    Romero, Luis; Jiménez, Mariano; Espinosa, María Del Mar; Domínguez, Manuel

    2015-01-01

    This study proposes the replacement of all the physical devices used in the manufacturing of conventional prostheses through the use of digital tools, such as 3D scanners, CAD design software, 3D implants files, rapid prototyping machines or reverse engineering software, in order to develop laboratory work models from which to finish coatings for dental prostheses. Different types of dental prosthetic structures are used, which were adjusted by a non-rotatory threaded fixing system. From a digital process, the relative positions of dental implants, soft tissue and adjacent teeth of edentulous or partially edentulous patients has been captured, and a maser working model which accurately replicates data relating to the patients oral cavity has been through treatment of three-dimensional digital data. Compared with the conventional master cast, the results show a significant cost savings in attachments, as well as an increase in the quality of reproduction and accuracy of the master cast, with the consequent reduction in the number of patient consultation visits. The combination of software and hardware three-dimensional tools allows the optimization of the planning of dental implant-supported rehabilitations protocol, improving the predictability of clinical treatments and the production cost savings of master casts for restorations upon implants.

  13. New Design for Rapid Prototyping of Digital Master Casts for Multiple Dental Implant Restorations

    Science.gov (United States)

    Romero, Luis; Jiménez, Mariano; Espinosa, María del Mar; Domínguez, Manuel

    2015-01-01

    Aim This study proposes the replacement of all the physical devices used in the manufacturing of conventional prostheses through the use of digital tools, such as 3D scanners, CAD design software, 3D implants files, rapid prototyping machines or reverse engineering software, in order to develop laboratory work models from which to finish coatings for dental prostheses. Different types of dental prosthetic structures are used, which were adjusted by a non-rotatory threaded fixing system. Method From a digital process, the relative positions of dental implants, soft tissue and adjacent teeth of edentulous or partially edentulous patients has been captured, and a maser working model which accurately replicates data relating to the patients oral cavity has been through treatment of three-dimensional digital data. Results Compared with the conventional master cast, the results show a significant cost savings in attachments, as well as an increase in the quality of reproduction and accuracy of the master cast, with the consequent reduction in the number of patient consultation visits. The combination of software and hardware three-dimensional tools allows the optimization of the planning of dental implant-supported rehabilitations protocol, improving the predictability of clinical treatments and the production cost savings of master casts for restorations upon implants. PMID:26696528

  14. Presentation master thesis at EAPRIL 2015 Conference

    NARCIS (Netherlands)

    Iris Sutherland; Richard Kragten; Zac Woolfitt

    2015-01-01

    Three graduates of the Inholland Master Leren en Innoveren (Zac Woolfitt, Iris Sutherland and Richard Kragten) each presented their master thesis in an interactive 'flipped' session which involved providing content in advance via a video for those attending the session. The session was well attended

  15. Second Line of Defense Master Spares Catalog

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, Dale L.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.

    2012-11-20

    This catalog is intended to be a comprehensive listing of repair parts, components, kits, and consumable items used on the equipment deployed at SLD sites worldwide. The catalog covers detection, CAS, network, ancillary equipment, and tools. The catalog is backed by a Master Parts Database which is used to generate the standard report views of the catalog. The master parts database is a relational database containing a record for every part in the master parts catalog along with supporting tables for normalizing fields in the records. The database also includes supporting queries, database maintenance forms, and reports.

  16. Savannah River Site Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  17. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  18. Remote handling devices for use behind shielding walls. Master-slave manipulators with three pivots, dimensions

    International Nuclear Information System (INIS)

    1993-08-01

    The standardized general dimensions as recommended in this standard will facilitate the planning and construction of shielding rooms in which master-slave manipulators as specified in this standard are to be used, as well as the interchangeability of these instruments. It will also help to shorten the time of delivery in the initial supply of maser-slave manipulators for these rooms and in the supply of replacement parts. (orig.) [de

  19. MASTER-OAFA discovery: dwarf nova outburst

    Science.gov (United States)

    Shumkov, V.; Lipunov, V.; Podesta, R.; Levato, H.; Buckley, D.; Tiurina, N.; Balanutsa, P.; Kuznetsov, A.; Gorbovskoy, E.; Kornilov, V.; Chazov, V.; Vlasenko, D.; Vladimirov, V.; Gress, O.; Ivanov, K.; Lopez, C.; Podesta, F.; Saffe, C.; Pogrosheva, T.

    2016-10-01

    MASTER-OAFA (Argentina, San Juan National Univeristy's Observatorio Astronomico Felix Aguilar) auto-detection system ( Lipunov et al., "MASTER Global Robotic Net", Advances in Astronomy, 2010, 30L ) discovered OT source at (RA, Dec) = 02h 19m 51.96s -69d 26m 59.6s on 2016-10-18.23277 UT. The OT magnitude in unfiltered is 17.2m (limit 18.3m).

  20. Improvement of RETRAN-MASTER-TORC transient capability and coupling optimization

    International Nuclear Information System (INIS)

    Cho, J. Y.; Song, J. S.; Joo, H. G.; Seo, K. W.; Whang, D. H.; Lee, C. C.; Zee, S. Q.

    2003-11-01

    This work is to improve MASTER-TORC transient calculation capability by complementing the previously developed consolidated code system RETRAN- MASTER-TORC, and to reduce the computing time by coupling optimization. The coupling soundness and optimization performance of the consolidated code system are evaluated by solving a YGN3 control bank ejection accident and the OECD Main Steam Line Break(MSLB) benchmark problems. The YGN3 control bank ejection accident is analyzed by the MASTER-TORC system. Most of all results including the transient core power, peak power and time are similar with those from the MASTER-COBRA system. In the computing time, the MASTER- TORC system is proved to be same as the MASTER-COBRA system, which means the coupling is sound and well-optimized. In the analysis of the OECD MSLB benchmark problem, the RETRAN-MASTER-TORC system shows the very similar results with the RETRAN-MASTER-COBRA system. However, minor differences due to fuel conductivity and thermal capacity model are noticed. In TORC, these parameters are treated as constants, while they are modeled as temperature dependent functions in COBRA. Therefore, in the future, TORC need to complement the temperature dependent thermal properties for accurate fuel and cladding temperature calculation. In the computing time for this problem, RETRAN-MASTER-TORC system shows a little bit faster than COBRA case

  1. Five Recession-Driven Strategies for Planning and Managing Campus Facilities

    Science.gov (United States)

    Rudden, Michael S.

    2010-01-01

    Colleges and universities continue to face significant fiscal challenges in the current recession. A review of ongoing campus facilities planning projects, coupled with a review of more than 30 recent campus master planning requests for proposals and the relevant literature, indicates that colleges and universities are finding innovative ways to…

  2. Mastering IDEAScript the definitive guide

    CERN Document Server

    Mueller, John Paul

    2011-01-01

    With approximately 44,000 users in the U.S. and Canada, as well as 42,000 in Europe, IDEA software has become a leading provider of data analysis software for use by auditors and accountants. Written to provide users with a quick access guide for optimal use of IDEAScript, Mastering IDEAScript: The Definitive Guide is IDEA's official guide to mastering IDEAScript, covering essential topics such as Introducing IDEAScript, Understanding the Basics of IDEAScript Editor, Designing Structured Applications, Understanding IDEA Databases and much more. For auditors, accountants and controllers.

  3. The Change Masters.

    Science.gov (United States)

    Kanter, Rosabeth Moss

    1984-01-01

    The change masters are identified as corporate managers who have the resources and the vision to effect an economic renaissance in the United States. Strategies for change should emphasize horizontal as well as vertical communication, and should reward enterprise and innovation at all levels. (JB)

  4. Planning oral narrative tasks: optimizing strategic planning condition through strategy instruction

    Directory of Open Access Journals (Sweden)

    André Luís Specht

    2017-06-01

    Full Text Available This article presents the results of a master thesis, which aimed at investigating the impact of strategic planning instruction on the speech performance of 6 L2 Brazilian learners. The participants, Letras-Inglês students, performed three now-and-there picture-cued narrative tasks under three different conditions: (1 no planning, (2 planning before instruction, and (3 planning after instruction. In addition, the participants filled in post-task questionnaires after the performance of each task, aiming at understanding their opinion on the conditions and tasks. Quantitative and qualitative analyses were conducted in order to examine participants’ oral production and perception, respectively. In general, there was no statistical evidence supporting the impact of instruction on participants’ oral planned performance; however, some statistical results approached significance, which may suggest some positive effects. Qualitative analyses provided positive evidence of the impact of strategic planning instruction on participant perception and their use of strategies during planning time. Moreover, the results of this study can contribute to the fields of Second Language Acquisition and Language Pegadogy.

  5. 46 CFR 169.817 - Master to instruct ship's company.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Master to instruct ship's company. 169.817 Section 169.817 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Operations § 169.817 Master to instruct ship's company. The master shall conduct drills and give instructions as necessary to insure that al...

  6. Revisiting the Master-Signifier, or, Mandela and Repression.

    Science.gov (United States)

    Hook, Derek; Vanheule, Stijn

    2015-01-01

    The concept of the master-signifier has been subject to a variety of applications in Lacanian forms of political discourse theory and ideology critique. While there is much to be commended in literature of this sort, it often neglects salient issues pertaining to the role of master signifiers in the clinical domain of (individual) psychical economy. The popularity of the concept of the master (or "empty") signifier in political discourse analysis has thus proved a double-edged sword. On the one hand it demonstrates how crucial psychical processes are performed via the operations of the signifier, extending thus the Lacanian thesis that identification is the outcome of linguistic and symbolic as opposed to merely psychological processes. On the other, the use of the master signifier concept within the political realm to track discursive formations tends to distance the term from the dynamics of the unconscious and operation of repression. Accordingly, this paper revisits the master signifier concept, and does so within the socio-political domain, yet while paying particular attention to the functioning of unconscious processes of fantasy and repression. More specifically, it investigates how Nelson Mandela operates as a master signifier in contemporary South Africa, as a vital means of knitting together diverse elements of post-apartheid society, enabling the fantasy of the post-apartheid nation, and holding at bay a whole series of repressed and negated undercurrents.

  7. Mastering Ext JS

    CERN Document Server

    Groner, Loiane

    2013-01-01

    Designed to be a structured guide, Mastering Ext JS is full of engaging examples to help you learn in a practical context.This book is for developers who are familiar with using Ext JS who want to augment their skills to create even better web applications.

  8. [Master course in biomedical engineering].

    Science.gov (United States)

    Jobbágy, Akos; Benyó, Zoltán; Monos, Emil

    2009-11-22

    The Bologna Declaration aims at harmonizing the European higher education structure. In accordance with the Declaration, biomedical engineering will be offered as a master (MSc) course also in Hungary, from year 2009. Since 1995 biomedical engineering course has been held in cooperation of three universities: Semmelweis University, Budapest Veterinary University, and Budapest University of Technology and Economics. One of the latter's faculties, Faculty of Electrical Engineering and Informatics, has been responsible for the course. Students could start their biomedical engineering studies - usually in parallel with their first degree course - after they collected at least 180 ECTS credits. Consequently, the biomedical engineering course could have been considered as a master course even before the Bologna Declaration. Students had to collect 130 ECTS credits during the six-semester course. This is equivalent to four-semester full-time studies, because during the first three semesters the curriculum required to gain only one third of the usual ECTS credits. The paper gives a survey on the new biomedical engineering master course, briefly summing up also the subjects in the curriculum.

  9. Task-oriented control of Single-Master Multi-Slave Manipulator System

    International Nuclear Information System (INIS)

    Kosuge, Kazuhiro; Ishikawa, Jun; Furuta, Katsuhisa; Hariki, Kazuo; Sakai, Masaru.

    1994-01-01

    A master-slave manipulator system, in general, consists of a master arm manipulated by a human and a slave arm used for real tasks. Some tasks, such as manipulation of a heavy object, etc., require two or more slave arms operated simultaneously. A Single-Master Multi-Slave Manipulator System consists of a master arm with six degrees of freedom and two or more slave arms, each of which has six or more degrees of freedom. In this system, a master arm controls the task-oriented variables using Virtual Internal Model (VIM) based on the concept of 'Task-Oriented Control'. VIM is a reference model driven by sensory information and used to describe the desired relation between the motion of a master arm and task-oriented variables. The motion of slave arms are controlled based on the task oriented variables generated by VIM and tailors the system to meet specific tasks. A single-master multi-slave manipulator system, having two slave arms, is experimentally developed and illustrates the concept. (author)

  10. Development of MR compatible laparoscope robot using master-slave control method

    International Nuclear Information System (INIS)

    Toyoda, Kazutaka; Jaeheon, Chung; Murata, Masaharu; Odaira, Takeshi; Hashizume, Makoto; Ieiri, Satoshi

    2011-01-01

    Recently, MRI guided robotic surgery has been studied. This surgery uses MRI, a surgical navigation system and a surgical robot system intraoperatively for realization of safer and assured surgeries. We have developed a MR compatible laparoscope robot and 4DOF master manipulator (master) independently. So, in this research we report system integration of the master and the laparoscope robot. The degrees of freedom between the master and the laparoscope robot is the same (4DOF), so that the relation of orientation between master and laparoscope robot is one to one. The network communication method between the master and the laparoscope robot is UDP connection based on TCP/IP protocol for reduction of communication delay. In future work we will do experiments of operability of master-slave laparoscope robot system. (author)

  11. The National Shipbuilding Research Program. United States Shipbuilding Standards Master Plan Update

    National Research Council Canada - National Science Library

    1997-01-01

    .... 7. Develop a marketing strategy for the plan. 8. Adopt or convert existing global standards for domestic use. This update includes an updated survey, the SP-6 tactical plan, new windows into standards on the internet, and more.

  12. MASTER- an indigenous nuclear design code of KAERI

    International Nuclear Information System (INIS)

    Cho, Byung Oh; Lee, Chang Ho; Park, Chan Oh; Lee, Chong Chul

    1996-01-01

    KAERI has recently developed the nuclear design code MASTER for the application to reactor physics analyses for pressurized water reactors. Its neutronics model solves the space-time dependent neutron diffusion equations with the advanced nodal methods. The major calculation categories of MASTER consist of microscopic depletion, steady-state and transient solution, xenon dynamics, adjoint solution and pin power and burnup reconstruction. The MASTER validation analyses, which are in progress aiming to submit the Uncertainty Topical Report to KINS in the first half of 1996, include global reactivity calculations and detailed pin-by-pin power distributions as well as in-core detector reaction rate calculations. The objective of this paper is to give an overall description of the CASMO/MASTER code system whose verification results are in details presented in the separate papers

  13. Valuing Initial Teacher Education at Master's Level

    Science.gov (United States)

    Brooks, Clare; Brant, Jacek; Abrahams, Ian; Yandell, John

    2012-01-01

    The future of Master's-level work in initial teacher education (ITE) in England seems uncertain. Whilst the coalition government has expressed support for Master's-level work, its recent White Paper focuses on teaching skills as the dominant form of professional development. This training discourse is in tension with the view of professional…

  14. Collaborative development of Estonian nuclear master's program

    Energy Technology Data Exchange (ETDEWEB)

    Tkaczyk, A. H.; Kikas, A.; Realo, E.; Kirm, M.; Kiisk, M.; Isakar, K.; Suursoo, S.; Koch, R.; Feldbach, E.; Lushchik, A.; Reivelt, K. [Inst. of Physics, Univ. of Tartu, Riia 142, Tartu 51014 (Estonia)

    2012-07-01

    In 2009 Estonia approved the National Development Plan for the Energy Sector, including the nuclear energy option. This can be realized by construction of a nuclear power plant (NPP) in Estonia or by participation in neighboring nuclear projects (e.g., Lithuania and/or Finland). Either option requires the availability of competent personnel. It is necessary to prepare specialists with expertise in all aspects related to nuclear infrastructure and to meet workforce needs (e.g. energy enterprises, public agencies, municipalities). Estonia's leading institutions of higher education and research with the support of the European Social Fund have announced in this context a new nuclear master's curriculum to be developed. The language of instruction will be English. (authors)

  15. Counterweight system for master-slave manipulator

    International Nuclear Information System (INIS)

    Haaker, L.W.; Jelatis, D.G.

    1981-01-01

    A counterweight system is described for use in a remote control master-slave manipulator. The manipulator consists of a rotatable horizontal support adapted to extend through the wall and two longitudinally extensible arms, a master and a slave, pivotally connected one to each end of the support. Within the support there is a means of translating linear motion to rotary motion for transfer through the barrier wall and retranslating to linear motion. (U.K.)

  16. Dual arm master controller development

    International Nuclear Information System (INIS)

    Kuban, D.P.; Perkins, G.S.

    1985-01-01

    The advanced servomanipulator (ASM) slave was designed with an anthropomorphic stance, gear/torque tube power drives, and modular construction. These features resulted in increased inertia, friction, and backlash relative to tape-driven manipulators. Studies were performed which addressed the human factors design and performance trade-offs associated with the corresponding master controller best suited for the ASM. The results of these studies, as well as the conceptual design of the dual arm master controller, are presented. This work was performed as part of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory. 5 refs., 7 figs., 1 tab

  17. Highlights of the SSC Site Development Plan

    International Nuclear Information System (INIS)

    Sanford, J.R.

    1991-10-01

    This paper summarizes highlights of the Site Development Plan for the Superconducting Super Collider Laboratory. The Plan, sometimes called a Master Plan, was prepared by the architectural and engineering firm for the Laboratory: Parsons Brinckerhoff/Morrison Knudsen (PB/MK) working in association with CRSS. Their task was to interpret the SSC project needs in the context of the Ellis County, Texas site. The team effort was under the direction of Lewis May from CRSS, guided by Robert Sims from the SSC Laboratory. Conceptual drawings are presented in this report

  18. Master Console System Monitoring and Control Development

    Science.gov (United States)

    Brooks, Russell A.

    2013-01-01

    The Master Console internship during the summer of 2013 involved the development of firing room displays and support applications at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I created control scripts using the Application Control Language (ACL) to analyze the health and status of Kennedy Ground Control System (KGCS) programmable logic controllers (PLCs). This application provides a system health and status display I created with summarized data for use by Master Console Operators (MCO) to monitor and verify the integrity of KGCS subsystems.

  19. Hatchery Spray Cabinet Administration Does Not Damage Avian Coronavirus Infectious Bronchitis Virus Vaccine Based on Analysis by Electron Microscopy and Virus Titration.

    Science.gov (United States)

    Roh, Ha-Jung; Jordan, Brian J; Hilt, Deborah A; Ard, Mary B; Jackwood, Mark W

    2015-03-01

    studies in our laboratory showed that the Arkansas-Delmarva Poultry Industry (Ark-DPI) vaccine given to 1-day-old chickens by hatchery spray cabinet replicated poorly and failed to adequately protect broilers against homologous virus challenge, whereas the same vaccine given by eye-drop did replicate and the birds were protected following homologous virus challenge. To determine if mechanical damage following spray application plays a role in failure of the Ark-DPI vaccine, we examined the morphology of three Ark-DPI vaccines from different manufacturers using an electron microscope and included a Massachusetts (Mass) vaccine as control. One of the Ark-DPI vaccines (vaccine A) and the Mass vaccine had significantly (P vaccines. We also found that the Ark-DPI and Mass vaccines had significantly (P vaccine titer before and after spray in embryonated eggs and found that both Ark-DPI and Mass vaccines had a similar drop in titer, 0.40 logi and 0.310 logi, respec10ively. Based on these data, it appears that mechanical damage to the Ark-DPI vaccine is not occurring when delivered by a hatchery spray cabinet, suggesting that some other factor is contributing to the failure of that vaccine when given by that method.

  20. Revisiting the master-signifier, or, Mandela and repression

    Directory of Open Access Journals (Sweden)

    Derek eHook

    2016-01-01

    Full Text Available The concept of the master-signifier has been subject to a variety of applications in Lacanian forms of political discourse theory and ideology critique. While there is much to be commended in literature of this sort, it often neglects salient issues pertaining to the role of master signifiers in the clinical domain of (individual psychical economy. The popularity of the concept of the master (or ‘empty’ signifier in political discourse analysis has thus proved a double-edged sword. On the one hand it demonstrates how crucial psychical processes are performed via the operations of the signifier, extending thus the Lacanian thesis that identification is as much the outcome of linguistic and symbolic as opposed to merely psychological processes. On the other, the use of the master signifier concept within the political realm to track discursive formations tends to distance the term from the dynamics of the unconscious and operation of repression. Accordingly, this paper revisits the master signifier concept, and does so within the socio-political domain, yet while paying particular attention to the functioning of unconscious processes of fantasy and repression. More specifically, it investigates how Nelson Mandela operates as a master signifier in contemporary South Africa, as a vital means of knitting together diverse elements of post-apartheid society, enabling the fantasy of the post-apartheid nation, and holding at bay a whole series of repressed and negated undercurrents.

  1. Defense Acquisitions: Antiarmor Munitions Master Plan Does Not Identify Potential Excesses or Support Planned Procurements

    National Research Council Canada - National Science Library

    2000-01-01

    .... According to the report, the plan should identify the projected armored threat and the projected quantity of all antiarmor weapons, whether fielded or in development, with the purpose of identifying...

  2. Nutritional Supplement of Hatchery Eggshell Membrane Improves Poultry Performance and Provides Resistance against Endotoxin Stress.

    Directory of Open Access Journals (Sweden)

    S K Makkar

    Full Text Available Eggshells are significant part of hatchery waste which consist of calcium carbonate crust, membranes, and proteins and peptides of embryonic origins along with other entrapped contaminants including microbes. We hypothesized that using this product as a nutritional additive in poultry diet may confer better immunity to the chickens in the paradigm of mammalian milk that enhances immunity. Therefore, we investigated the effect of hatchery eggshell membranes (HESM as a short term feed supplement on growth performance and immunity of chickens under bacterial lipopolysaccharide (LPS challenged condition. Three studies were conducted to find the effect of HESM supplement on post hatch chickens. In the first study, the chickens were fed either a control diet or diets containing 0.5% whey protein or HESM as supplement and evaluated at 5 weeks of age using growth, hematology, clinical chemistry, plasma immunoglobulins, and corticosterone as variables. The second and third studies were done to compare the effects of LPS on control and HESM fed birds at 5 weeks of age following at 4 and 24 h of treatment where the HESM was also sterilized with ethanol to deplete bacterial factors. HESM supplement caused weight gain in 2 experiments and decreased blood corticosterone concentrations. While LPS caused a significant loss in body weight at 24 h following its administration, the HESM supplemented birds showed significantly less body weight loss compared with the control fed birds. The WBC, heterophil/lymphocyte ratio, and the levels of IgG were low in chickens fed diets with HESM supplement compared with control diet group. LPS challenge increased the expression of pro-inflammatory cytokine gene IL-6 but the HESM fed birds showed its effect curtailed, also, which also, favored the up-regulation of anti-inflammatory genes compared with control diet fed chickens. Post hatch supplementation of HESM appears to improve performance, modulate immunity, and increase

  3. Comparison of Space Debris Environment Models: ORDEM2000, MASTER-2001, MASTER-2005 and MASTER-2009

    OpenAIRE

    Kanemitsu, Yuki; 赤星, 保浩; Akahoshi, Yasuhiro; 鳴海, 智博; Narumi, Tomohiro; Faure, Pauline; 松本, 晴久; Matsumoto, Haruhisa; 北澤, 幸人; Kitazawa, Yukihito

    2012-01-01

    Hypervelocity impact by space debris on spacecraft is one of the most important issues for space development and operation, especially considering the growing amount of space debris in recent years. It is therefore important for spacecraft design to evaluate the impact risk by using environment models. In this paper, the authors compared the results of the debris impact flux in low Earth orbit, as calculated by four debris environment engineering models -NASA's ORDEM2000 and ESA's MASTER-2001...

  4. Mastering your Fellowship

    African Journals Online (AJOL)

    will be based on the ten clinical domains of family medicine, ... tutors), before finding the model answers online: http://www. ... The series, “Mastering your Fellowship”, provides examples of the question format ... 3.1 What is the argument for the social value of the study? ..... Primary health care re-engineering policy and the.

  5. Master-slave robotic system for needle indentation and insertion.

    Science.gov (United States)

    Shin, Jaehyun; Zhong, Yongmin; Gu, Chengfan

    2017-12-01

    Bilateral control of a master-slave robotic system is a challenging issue in robotic-assisted minimally invasive surgery. It requires the knowledge on contact interaction between a surgical (slave) robot and soft tissues. This paper presents a master-slave robotic system for needle indentation and insertion. This master-slave robotic system is able to characterize the contact interaction between the robotic needle and soft tissues. A bilateral controller is implemented using a linear motor for robotic needle indentation and insertion. A new nonlinear state observer is developed to online monitor the contact interaction with soft tissues. Experimental results demonstrate the efficacy of the proposed master-slave robotic system for robotic needle indentation and needle insertion.

  6. Mastering Lumion 3D

    CERN Document Server

    Cardoso, Ciro

    2014-01-01

    This book is designed for all levels of Lumion users; from beginner to advanced, you will find useful insights and professional techniques to improve and develop your skills in order to fully control and master Lumion.

  7. Umatilla Basin Natural Production Monitoring and Evaluation; 1998-2002 Summary Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2004-07-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPME). Chapter One provides an overview of the entire report and shows how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. This chapter also provides background information relevant to the aquatic resources of the Umatilla River Basin. (Figure 1-1, Tables 1-1 and 1-2). Data and reports from this and previous efforts are available on the CTUIR website http://www.umatilla.nsn.us. This project was one of several subprojects of the Umatilla River Basin Fisheries Restoration Master Plan (CTUIR 1984, ODFW 1986) orchestrated to rehabilitate salmon and steelhead runs in the Umatilla River Basin. Subprojects in additions to this project include: Watershed Enhancement and Rehabilitation; Hatchery Construction and Operation; Hatchery Monitoring and Evaluation; Satellite Facility Construction and Operations for Juvenile Acclimation and Adult Holding and Spawning; Fish Passage Construction and Operation; Juvenile and Adult Passage Facility Evaluations; Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Basin, and Flow Augmentation to Increase Stream Flows below Irrigation Diversions.

  8. Mastering Adobe Premiere Pro CS6

    CERN Document Server

    Ekert, Paul

    2013-01-01

    Designed to be practical and engaging, Mastering Adobe Premiere Pro CS6 is a project-based book to help you truly augment your skills and become a film editing hotshot.If you're just starting out or even migrating from existing video editing software, then this book is for you. With rapid progression through practical examples constructed to be both engaging and useful, Mastering Adobe Premiere Pro CS6 is ideal for learning the sometimes complex workflows of this powerful application.

  9. Unlocking the electric mobility potential of Toronto: moving toward an electric mobility master plan for the city

    International Nuclear Information System (INIS)

    Gleeson, A.; Scratch, K.

    2010-10-01

    This report is an analysis of the current state of electric transportation and its potential integration in the transportation system of the city of Toronto. In this document, electric vehicles include every mode of transport involving the use of energy drawn from the electricity grid, such as plug-in hybrid electric vehicles (PHEV), extended range electric vehicles (EREV), battery electric vehicles (BEV), grid connected transit vehicles and electrified locomotives. An overview of the movement of people and goods, including the consideration of patterns of commuting and modes of transportation, is provided in the first section of this document. It has been demonstrated that most of the trips taking place in the city correspond to the predicted operating range of many EVs. Section one also provides a description of the local electricity grid system serving Toronto neighbourhoods and of the sources and movements of air contaminants. It gives a evaluation of the state of EV technologies and analyzes the economic and social factors that have an impact on the public perceptions regarding these technologies. Current policies and programs designed to promote market adoption of EVs around the world are outlined in the conclusion of this section. A simulation work was performed through a collaborative work with Toronto Hydro Electric System Limited in order to analyze the consequences of different EV charging scenarios on the electricity grid system. The results of this simulation are described in section two of the report. The document also presents the outcomes of the workshop on the implementation of an electric mobility master plan held in Toronto in April, 2010. 176 refs.

  10. PLAN FOR PRIMARY HEALTH CARE IN MINAS GERAIS AND SCIENTIFIC PRODUCTION

    Directory of Open Access Journals (Sweden)

    Tatiana Oliveira Silva Bittencourt

    2014-05-01

    Full Text Available This study aimed to identify studies on the Master Plan for Primary Health Care from the year 2003. We conducted a bibliographic study on MEDLINE, LILACS, SCIELO , BDENF and Google Scholar . The results are detailed in tables and discussed from four themes. The Master Plan for Primary Health Care is an innovative and daring in the reorganization of primary care in the municipalities miners. Gave the participants an important opportunity for professional qualification. Difficulties in its implementation outperformed the potential and were present in most of the municipalities surveyed. Among the main challenges for its implementation highlights the lack of professional motivation and credibility by some involved in this process. The literature made little progress on this issue , and we hope that further research be undertaken in order to contribute to studies of evaluation of public policies and in particular the extension and consolidation of this plan.

  11. Fiscal 2000 survey report on rationalization project for international energy conservation. Preparation of master plan for rational energy consumption (Shanxi Province, China); 2000 nendo kokuasi energy shiyo gorika kiban seibi jigyo chosa hokokusho. Goriteki energy shiyo no tame no master plan sakusei (Chugoku Shanxi sho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A comprehensive master plan for Shanxi Province was prepared jointly with China for the purpose of promoting rational use of energy and realizing an environmentally harmonious demand/supply structure of energy. This paper describes the fiscal 2000 results. The first phase refers to the surmounting of environmental problems incident to the use of coal and the restoration of regional economy. As countermeasures against air pollution in Taiyuan City, environmental measures were propagated such as simplified flue-gas desulfurization in thermal power plants, energy conservation in coke dry quenching, etc., and desulfurization of coke oven gas. Bio-briquette effective against smoke and soot pollution was carried out, as was general rubbish treatment (e.g., compost and coal/rubbish mixed combustion power generation). Promoted, by the opening of a clean coal center, were sulfur content reduction, coal briquette method, market expansion for CWM, etc. Producing city gas out of coal mine methane gas was also among the ideas considered. With the aim of attaining a Shanxi Province zero emission program, incentives are essential and, for this purpose, support by the national government is desirable including subsidies for investment, low-interest loans, tax deductions/exemptions, and yen-denominated loans from Japan. The second phase is intended for harmony with culture/science/nature, control of global warming and advanced utilization of coal. (NEDO)

  12. Oil and gas field code master list 1994

    Energy Technology Data Exchange (ETDEWEB)

    1995-01-01

    This is the thirteenth annual edition of the Energy Information Administration`s (EIA) Oil and Gas Field Code Master List. It reflects data collected through October 1994 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the United States. The master field name spellings and codes are to be used by respondents when filing the following Department of Energy (DOE) forms: Form EIA-23, {open_quotes}Annual Survey of Domestic Oil and Gas Reserves,{close_quotes} filed by oil and gas well operators (field codes are required from larger operators only); Forms FERC 8 and EIA-191, {open_quotes}Underground Gas Storage Report,{close_quotes} filed by natural gas producers and distributors who operate underground natural gas storage facilities. Other Federal and State government agencies, as well as industry, use the EIA Oil and Gas Field Code Master List as the standard for field identification. A machine-readable version of the Oil and Gas Field Code Master List is available from the National Technical Information Service, 5285 Port Royal Road, Springfield, Virginia 22161, (703) 487-4650. In order for the Master List to be useful, it must be accurate and remain current. To accomplish this, EIA constantly reviews and revises this list. The EIA welcomes all comments, corrections, and additions to the Master List. All such information should be given to the EIA Field Code Coordinator at (214) 953-1858. EIA gratefully acknowledges the assistance provides by numerous State organizations and trade associations in verifying the existence of fields and their official nomenclature.

  13. Surgical bedside master console for neurosurgical robotic system.

    Science.gov (United States)

    Arata, Jumpei; Kenmotsu, Hajime; Takagi, Motoki; Hori, Tatsuya; Miyagi, Takahiro; Fujimoto, Hideo; Kajita, Yasukazu; Hayashi, Yuichiro; Chinzei, Kiyoyuki; Hashizume, Makoto

    2013-01-01

    We are currently developing a neurosurgical robotic system that facilitates access to residual tumors and improves brain tumor removal surgical outcomes. The system combines conventional and robotic surgery allowing for a quick conversion between the procedures. This concept requires a new master console that can be positioned at the surgical bedside and be sterilized. The master console was developed using new technologies, such as a parallel mechanism and pneumatic sensors. The parallel mechanism is a purely passive 5-DOF (degrees of freedom) joystick based on the author's haptic research. The parallel mechanism enables motion input of conventional brain tumor removal surgery with a compact, intuitive interface that can be used in a conventional surgical environment. In addition, the pneumatic sensors implemented on the mechanism provide an intuitive interface and electrically isolate the tool parts from the mechanism so they can be easily sterilized. The 5-DOF parallel mechanism is compact (17 cm width, 19cm depth, and 15cm height), provides a 505,050 mm and 90° workspace and is highly backdrivable (0.27N of resistance force representing the surgical motion). The evaluation tests revealed that the pneumatic sensors can properly measure the suction strength, grasping force, and hand contact. In addition, an installability test showed that the master console can be used in a conventional surgical environment. The proposed master console design was shown to be feasible for operative neurosurgery based on comprehensive testing. This master console is currently being tested for master-slave control with a surgical robotic system.

  14. Master in Urban Quality

    DEFF Research Database (Denmark)

    2006-01-01

    Development and content of an international Master in Urban Quality development and management. The work has been done in a cooperation between Berlage institut, Holland; Chulalongkorn University, Thailand; Mahidol University, Thailand; University Kebangsaan Malaysia, Malaysia; og Aalborg...

  15. INFORMATION TECHNOLOGIES AS COMPONENT OF FUNCTIONAL AND SUBSTANTIAL MODEL OF FORMATION PREDICTIVECOMPETENCE OF FUTURE MASTERS OF PRIMARY EDUCATION

    Directory of Open Access Journals (Sweden)

    Anastasia Kinesheva

    2015-10-01

    Full Text Available Considerd the structure and the maintenance of the model of formation of predictive competence of future masters of primary education by means of information technologies.Revealed the purposes, the main methodological approaches and the principles to the organization of this process. The effectiveness of this model provided by the system of pedagogical conditions: formation of motivational-value treatment to future predictive activity; determination of understanding the existing dependence between the level of predictive competence and level of the general professional competence of future masters of primary education through introduction of a special course «Predictive activity in system of management of primary education»; innovative information and communication the educational environment; integration of a special course «Predictive activity in system of management of primary education», production, pre-graduation practices. The realization of the specified pedagogical conditions is planning to enable due to specially created information and education environment, presented by innovative forms, methods and means which are relative. Defined the following structural components (motivational-value, pregnant, technological and personal, criteria (motivational-value, cognitive, operational-activity, reflexive, the indicators and levels (advanced, sufficient and basic formation of predictive competence of future masters of primary education. The educational process constructed on the basis of this model allows to reach desirable result: to create predictive competence at future masters of primary education.

  16. Crocodilian Nest in a Late Cretaceous Sauropod Hatchery from the Type Lameta Ghat Locality, Jabalpur, India.

    Directory of Open Access Journals (Sweden)

    Rahul Srivastava

    Full Text Available The well-known Late Cretaceous Lameta Ghat locality (Jabalpur, India provides a window of opportunity to study a large stable, near shore sandy beach, which was widely used by sauropod dinosaurs as a hatchery. In this paper, we revisit the eggs and eggshell fragments previously assigned to lizards from this locality and reassign them to crocodylomorphs. Several features point to a crocodilian affinity, including a subspherical to ellipsoidal shape, smooth, uneven external surface, discrete trapezoid shaped shell units with wide top and narrow base, basal knobs and wedge shaped crystallites showing typical inverted triangular extinction under crossed nicols. The crocodylomorph eggshell material presented in this paper adds to the skeletal data of these most probably Cretaceous-Eocene dryosaurid crocodiles.

  17. Mastering Grunt

    CERN Document Server

    Li, Daniel

    2014-01-01

    This easy-to-understand tutorial provides you with several engaging projects that show you how to utilize Grunt with various web technologies, teaching you how to master build automation and testing with Grunt in your applications.If you are a JavaScript developer who is looking to streamline their workflow with build-automation, then this book will give you a kick start in fully understanding the importance of the described web technologies and automate their processes using Grunt.

  18. The master field revisited

    International Nuclear Information System (INIS)

    Gopakumar, R.

    1996-01-01

    We review recent work on the master field in large N theories. In particular the mathematical framework appropriate for its construction is sketched. The calculational utility of this framework is demonstrated in the case of QCD 2 . (orig.)

  19. Mastering Unity scripting

    CERN Document Server

    Thorn, Alan

    2015-01-01

    Mastering Unity Scripting is an advanced book intended for students, educators, and professionals familiar with the Unity basics as well as the basics of scripting. Whether you've been using Unity for a short time or are an experienced user, this book has something important and valuable to offer to help you improve your game development workflow.

  20. Master Clock and Time-Signal-Distribution System

    Science.gov (United States)

    Tjoelker, Robert; Calhoun, Malcolm; Kuhnle, Paul; Sydnor, Richard; Lauf, John

    2007-01-01

    A timing system comprising an electronic master clock and a subsystem for distributing time signals from the master clock to end users is undergoing development to satisfy anticipated timing requirements of NASA s Deep Space Network (DSN) for the next 20 to 30 years. This system has a modular, flexible, expandable architecture that is easier to operate and maintain than the present frequency and timing subsystem (FTS).

  1. 46 CFR 196.45-1 - Master and chief engineer responsible.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Master and chief engineer responsible. 196.45-1 Section... VESSELS OPERATIONS Carrying of Excess Steam § 196.45-1 Master and chief engineer responsible. (a) It shall be the duty of the master and the engineer in charge of the boilers of any vessel to require that a...

  2. 46 CFR 97.45-1 - Master and chief engineer responsible.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Master and chief engineer responsible. 97.45-1 Section... VESSELS OPERATIONS Carrying of Excess Steam § 97.45-1 Master and chief engineer responsible. It shall be the duty of the master and the chief engineer of any vessel to require that a steam pressure is not...

  3. 46 CFR 78.55-1 - Master and chief engineer responsible.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Master and chief engineer responsible. 78.55-1 Section... OPERATIONS Carrying of Excess Steam § 78.55-1 Master and chief engineer responsible. It shall be the duty of the master and the engineer in charge of the boilers of any vessel to require that a steam pressure is...

  4. Control of 4-DOF MR haptic master for medical application

    Science.gov (United States)

    Oh, Jong-Seok; Choi, Seung-Hyun; Choi, Seung-Bok

    2014-03-01

    In this work, magnetorheological (MR) based haptic master for robot-assisted minimally invasive surgery (RMIS) is proposed and analyzed. Using a controllable MR fluid, the masters can generate a reflection force with the 4-DOF motion. The proposed master consists of two actuators: MR clutch featuring gimbal mechanism for 2-DOF rotational motion (X and Y axes) and MR clutch attached at gripper of gimbal structures for 1-DOF rotational motion (Z axis) and 1-DOF translational motion. After analyzing the dynamic motion by integrating mechanical and physical properties of the actuators, torque model of the proposed haptic master is derived. For realization of master-slave system, an encoder which can measure position information is integrated with the MR haptic master. In the RMIS system, the measured position is converted as a command signal and sent to the slave robot. In this work, slave and organ of patient are modeled in virtual space. In order to embody a human organ into virtual space, a volumetric deformable object is mathematically formulated by a shape retaining chain linked (S-chain) model. Accordingly, the haptic architecture is established by incorporating the virtual slave with the master device in which the reflection force and desired position originated from the object of the virtual slave and operator of the master, respectively, are transferred to each other. In order to achieve the desired force trajectories, a proportional-integral-derivative (PID) controller is designed and implemented. It has been demonstrated that the effective tracking control performance for the desired motion of reflection force is well presented in time domain.

  5. Wave Climate and Wave Response, 2025 Plan, Kahului Harbor, Maui, Hawaii

    National Research Council Canada - National Science Library

    Thompson, Edward

    2002-01-01

    ... (wind waves and swell) and long waves (harbor oscillations), was used to evaluate the technical feasibility of three alternative modifications to the harbor, including the Kahului Commercial Harbor 2025 Master Plan...

  6. Master of the House Blu-Ray

    DEFF Research Database (Denmark)

    Tybjerg, Casper

    2014-01-01

    In this interview, produced by the Criterion Collection in 2014, Danish film historian Casper Tybjerg discusses how Master of the House went from being a popular stage play to a film, one that was a major stepping-stone in director Carl Theodor Dreyer's career.......In this interview, produced by the Criterion Collection in 2014, Danish film historian Casper Tybjerg discusses how Master of the House went from being a popular stage play to a film, one that was a major stepping-stone in director Carl Theodor Dreyer's career....

  7. Business Plan Competitions: An Overview. CELCEE Digest.

    Science.gov (United States)

    Seymour, Nicole

    This document describes business plan competitions sponsored by universities. The idea began in the early 1980s at the University of Texas when Masters in Business Administration (MBA) students created a friendly competitive activity along the lines of the law schools Moot Court competition. Later the competition became national, and then…

  8. The UK Postgraduate Masters Dissertation: An "Elusive Chameleon"?

    Science.gov (United States)

    Pilcher, Nick

    2011-01-01

    Many studies into the process of producing and supervising dissertations exist, yet little research into the "product" of the Masters dissertation, or into how Masters supervision changes over time exist. Drawing on 62 semi-structured interviews with 31 Maths and Computer Science supervisors over a two-year period, this paper explores…

  9. 77 FR 13141 - Notice of Intent To Prepare a Master Leasing Plan, Amendments to the Resource Management Plans...

    Science.gov (United States)

    2012-03-05

    ... Northrup, Project Manager, BLM Moab Field Office, 82 East Dogwood, Moab, UT 84532, telephone (435) 259-2151... Instruction Memorandum No. 2010-117. The MLP process will provide additional planning and analysis for areas... with varying mitigation levels for leasing. The planning area covers about 783,000 acres in east...

  10. FINANCIAL PLANNING AND FINANCING OF SPORTS COMPETITIONS

    Directory of Open Access Journals (Sweden)

    Srećko Novaković

    2012-09-01

    Full Text Available Manager of sport competition has right to decide and also to take responsibility for costs, income and financial results. From economic point of wiev flexible budget and planning cost calculations is top management base for analyzing success level of sport competition. Flexible budget is made before sport competition with few output level, where one is always from static plan-master plan. At the end of competition when we have results, we make report of plan executing and we also analyzing plan variances. Results of comparation between achieved and planning level of static budget can be acceptable if achieved level is approximate to budget level or if we analyzing results from gross or net income. Flexible budget become very important in case of world economic crises.

  11. Denmark’s Master of Public Governance Program

    DEFF Research Database (Denmark)

    Greve, Carsten; Pedersen, Anne Reff

    2017-01-01

    This paper focuses on Denmark’s Master of Public Governance and its assessments and lessons learned. Denmark is seen to have an efficient economy and public sector, a digitalized public service delivery system, and an advanced work–life balance. The Danish government invested substantial resources...... into developing a Master of Public Governance program – a flexible and modular program for public managers to take over a period of up to six years. The paper focuses on the Copenhagen version of the Master of Public Governance program. More than 1000 public managers from central, regional and local government...... are now active in pursuing an executive public management education through this program. The development, structure, content and the innovative teaching ideas are presented. The available data, including an official evaluation of the MPG program, is used to assess the program and present some lessons...

  12. Implementation of a Gamification Platform in a Master Degree (Master in Economics

    Directory of Open Access Journals (Sweden)

    Juan Carlos Fernández-Zamora

    2017-06-01

    An experiment has been carried out for this reason, in which an educational platform, created in a personalized way for the students of the Master in Economics of the University of Granada, becomes the day to day of these students, yielding results and Statistics on how to improve student motivation.

  13. Recent developments in the Virasoro master equation

    International Nuclear Information System (INIS)

    Halpern, M.B.

    1991-01-01

    The Virasoro master equation collects all possible Virasoro constructions which are quadratic in the currents of affine Lie g. The solution space of this system is immense, with generically irrational central charge, and solutions which have so far been observed are generically unitary. Other developments reviewed include the exact C-function, the superconformal master equation and partial classification of solutions by graph theory and generalized graph theories. 37 refs., 1 fig., 1 tab

  14. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Pearsons, Todd N.; Easterbrooks, John A. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-09-01

    The Yakima/Klickitat Fisheries Project (YKFP) is a supplementation project sponsored by the Northwest Power Planning Council and funded by the Bonneville Power Administration. The YKFP has adopted the definition of supplementation described by Regional Assessment of Supplementation Program (1992), which is ''the use of artificial propagation in an attempt to maintain or increase natural production while maintaining the long-term fitness of the target population, and keeping the ecological and genetic impacts on nontarget populations within specified biological limits''. Recent scientific reviews of hatchery supplementation continue to highlight the experimental nature and risk of supplementation (Independent Scientific Group 1996; National Research Council 1996; Lichatowich 1999; Independent Multidisciplinary Science Team 2000; Independent Scientific Advisory Board 2003; Hatchery Scientific Review Group 2003). In addition, many of these reviews included recommendations about the best ways to operate a supplementation program. Most of these recommendations were already being done or have been incorporated into the YKFP. The objectives of the YKFP are: (1) to test the hypothesis that new supplementation techniques can be used in the Yakima River Basin to increase natural production and to improve harvest opportunities while maintaining the long-term genetic fitness of the wild and native salmonid populations and keeping adverse ecological interactions within acceptable limits (Yakima Fisheries Project Final Environment Impact Statement, 1996); (2) provide knowledge about the use of supplementation, so that it may be used to mitigate effects on anadromous fisheries throughout the Columbia River Basin; (3) to maintain and improve the quantity and productivity of salmon and steelhead habitat, including those areas made accessible by habitat improvements; (4) to ensure that Project implementation remains consistent with the Council's Fish and

  15. Control of master-slave manipulator using virtual force

    International Nuclear Information System (INIS)

    Kosuge, Kazuhiro; Fukuda, Toshio; Itoh, Tomotaka; Sakamoto, Keizoh; Noma, Yasuo.

    1994-01-01

    We propose a control system for a master-slave manipulator system having a rate-controlled slave manipulator. In this system, the master manipulator is stiffness-controlled in the Cartesian coordinate system, and the slave manipulator is damping-controlled in the Cartesian coordinate system. The desired velocity of the slave arm is given by a displacement of the master arm from a nominal position. The operator feels virtual contact force from the environment because the contact force is proportional to the displacement when the slave arm motion is constrained by the environment. The proposed method is experimentally applied to manipulators with three degrees of freedom. The experimental results illustrate the validity of the proposed system. (author)

  16. SWOT analysis to evaluate the programme of a joint online/onsite master's degree in environmental education through the students' perceptions.

    Science.gov (United States)

    Romero-Gutierrez, Miguel; Jimenez-Liso, M Rut; Martinez-Chico, Maria

    2016-02-01

    This study shows the use of SWOT to analyse students' perceptions of an environmental education joint master's programme in order to determine if it runs as originally planned. The open answers given by students highlight the inter-university nature of the master's, the technological innovation used as major points, and the weaknesses in the management coordination or the duplicate contents as minor points. The external analysis is closely linked with the students' future jobs, their labour opportunities available to them after graduation. The innovative treatment of the data is exportable to the evaluation of programmes of other degrees because it allows the description linked to its characteristics and its design through the students' point of view. Copyright © 2015 Elsevier Ltd. All rights reserved.

  17. Urban energy planning in Tartu

    DEFF Research Database (Denmark)

    Große, Juliane; Groth, Niels Boje; Fertner, Christian

    The Estonian planning system allots the main responsibilities for planning activities to the local level, whereas the regional level (county) is rather weak. That implies a gap of cooperation on the regional level, leading to dispersed urban development in suburban municipalities and ongoing urban...... sprawl in the vicinity of Tartu. This development appears contrary to the concept of “low-density urbanised space” as formulated in the National Spatial Plan “Estonia 2030+” (NSP) as the central spatial development concept for Estonia and also to a compact and intensive city development as formulated...... in the Master Plan of Tartu. Since Tartu has no relevant big industries, the main employers are the municipality and the university, energy related challenges occur from transport and residential (district) heating. The modal split shows big differences between journeys within Tartu and journeys between Tartu...

  18. Snake River sockeye salmon captive broodstock program: hatchery element: annual progress report, 2000.; ANNUAL

    International Nuclear Information System (INIS)

    Kline, Paul A.; Willard, Catherine

    2001-01-01

    On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Marine Fisheries Service at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Marine Fisheries Service are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases are also reported under separate cover. Captive broodstock program activities conducted between January 1, 2000 and December 31, 2000 are presented in this report

  19. Effects of inverting the position of layers eggs during storage on hatchery performance parameters

    Directory of Open Access Journals (Sweden)

    JCS de Lima

    2012-12-01

    Full Text Available Storing hatchable eggs is a common practice in commercial hatcheries. However, storage time may negative effects on several performance parameters. An experiment was carried out to evaluate inverting egg position during storage of eggs laid by young and old layer breeders. Fertile eggs of 32 and 58-week-old breeders were stored for seven, 14, and 21 days at 18ºC ± 2ºC and 80% ± 10% relative humidity (RU. The following parameters were evaluated: egg weight loss, hatchability and hatchling weight, and embryodiagnosis results. Eggs stored with the small end up lost less weight during storage compared with the control eggs. Storing eggs for 14 days with the small end up reduced early embryo mortality, improving hatchability. In addition, hatchling weight increased. These results show that the detrimental effects of long storage periods may be alleviated when eggs are stored with the small end up to 14 days of storage.

  20. State of the art in design and control of master-slave manipulators

    International Nuclear Information System (INIS)

    Kim, Ki Ho; Kim, Seung Ho; Kim, Byung Soo; Kim, Chang Hoi; Jung, Seung Ho; Kwang, Suk Yeoung; Seo, Yong Chil; Lee, Young Kwang

    1998-03-01

    The use of remotely operated robots and other mechanical devices as replacements of human workers in hazardous environments is a growing field of research. In particular, master-slave manipulators have been extensively used in the nuclear industries governed by the ALARA principle for more than four decades. There, however, are still few successful implementations of complex and high degree-of-freedom systems. The master manipulator is an input device which interfaces with the human operator on one side and with the slave manipulator on the other. Bilateral force-reflecting control plays a key supporting role in successful dexterous manipulation of the master-slave manipulators. Great increase in performance of the master-slave manipulator system can be achieved through good design of mechanical hardware and proper implementation of the embedded control strategies. This report presents some of design issues relevant to designers of the master manipulator as man-machine interface device in the master-slave manipulator system. Significant design parameters for both the replica and universal master manipulators are evaluated. In addition, the report describes the various control schemes of the bilateral force-reflecting master-slave manipulators, discusses the analysis and synthesis of the control loop between the master and slave manipulators, and examines the necessary position and force information on both sides. (author). 80 refs., 2 tabs., 15 figs

  1. Nisin Z produced by Lactococcus lactis from bullfrog hatchery is active against Citrobacter freundii, a red-leg syndrome related pathogen.

    Science.gov (United States)

    Quintana, Gabriel; Niederle, Maria V; Minahk, Carlos J; Picariello, Gianluca; Nader-Macías, María E F; Pasteris, Sergio E

    2017-09-27

    Lactococcus lactis subsp. lactis CRL 1584 isolated from a bullfrog hatchery produces a bacteriocin that inhibits both indigenous Citrobacter freundii (a Red-Leg Syndrome related pathogen) and Lactobacillus plantarum, and Listeria monocytogenes as well. Considering that probiotics requires high cell densities and/or bacteriocin concentrations, the effect of the temperature on L. lactis growth and bacteriocin production was evaluated to find the optimal conditions. Thus, the growth rate was maximal at 36 °C, whereas the highest biomass and bacteriocin activity was achieved between 20 and 30 °C and 20-25 °C, respectively. The bacteriocin synthesis was closely growth associated reaching the maximal values at the end of the exponential phase. Since bacteriocins co-production has been evidenced in bacterial genera, a purification of the bacteriocin/s from L. lactis culture supernatants was carried out. The active fraction was purified by cationic-exchange chromatography and then, a RP-HPLC was carried out. The purified sample was a peptide with a 3353.05 Da, a molecular mass that matches nisin Z, which turned out to be the only bacteriocin produced by L. lactis CRL 1584. Nisin Z showed bactericidal effect on C. freundii and L. monocytogenes, which increased in the presence L-lactic acid + H 2 O 2 . This is the first report on nisin Z production by L. lactis from a bullfrog hatchery that resulted active on a Gram-negative pathogen. This peptide has potential probiotic for raniculture and as food biopreservative for bullfrog meat.

  2. Development and verification of a coupled code system RETRAN-MASTER-TORC

    International Nuclear Information System (INIS)

    Cho, J.Y.; Song, J.S.; Joo, H.G.; Zee, S.Q.

    2004-01-01

    Recently, coupled thermal-hydraulics (T-H) and three-dimensional kinetics codes have been widely used for the best-estimate simulations such as the main steam line break (MSLB) and locked rotor problems. This work is to develop and verify one of such codes by coupling the system T-H code RETRAN, the 3-D kinetics code MASTER and sub-channel analysis code TORC. The MASTER code has already been applied to such simulations after coupling with the MARS or RETRAN-3D multi-dimensional system T-H codes. The MASTER code contains a sub-channel analysis code COBRA-III C/P, and the coupled systems MARSMASTER-COBRA and RETRAN-MASTER-COBRA had been already developed and verified. With these previous studies, a new coupled system of RETRAN-MASTER-TORC is to be developed and verified for the standard best-estimate simulation code package in Korea. The TORC code has already been applied to the thermal hydraulics design of the several ABB/CE type plants and Korean Standard Nuclear Power Plants (KSNP). This justifies the choice of TORC rather than COBRA. Because the coupling between RETRAN and MASTER codes are already established and verified, this work is simplified to couple the TORC sub-channel T-H code with the MASTER neutronics code. The TORC code is a standalone code that solves the T-H equations for a given core problem from reading the input file and finally printing the converged solutions. However, in the coupled system, because TORC receives the pin power distributions from the neutronics code MASTER and transfers the T-H results to MASTER iteratively, TORC needs to be controlled by the MASTER code and does not need to solve the given problem completely at each iteration step. By this reason, the coupling of the TORC code with the MASTER code requires several modifications in the I/O treatment, flow iteration and calculation logics. The next section of this paper describes the modifications in the TORC code. The TORC control logic of the MASTER code is then followed. The

  3. A Comparison of the McMaster and Circumplex Family Assessment Instruments.

    Science.gov (United States)

    Fristad, Mary A.

    1989-01-01

    Compared clinical rating scales and self-report scales from McMaster and Circumplex models of family functioning with families (N=41). Found McMaster instruments had superior sensitivity; greater correspondence between clinical rating scales and family member self-report inventories on McMaster instruments; and lack of support for the curvilinear…

  4. The timing master for the FAIR accelerator facility

    International Nuclear Information System (INIS)

    Baer, R.C.; Fleck, T.; Kreider, M.; Mauro, S.

    2012-01-01

    One central design feature of the FAIR accelerator complex is a high level of parallel beam operation, imposing ambitious demands on the timing and management of accelerator cycles. Several linear accelerators, synchrotrons, storage rings and beam lines have to be controlled and reconfigured for each beam production chain on a pulse-to-pulse basis, with cycle lengths ranging from 20 ms to several hours. This implies initialization, synchronization of equipment on the time scale down to the ns level, inter-dependencies, multiple paths and contingency actions like emergency beam dump scenarios. The FAIR timing system will be based on White Rabbit (WR) network technology, implementing a central Timing Master (TM) unit to orchestrate all machines. The TM is subdivided into separate functional blocks: the Clock Master, which deals with time and clock sources and their distribution over WR, the Management Master, which administrates all WR timing receivers, and the Data Master, which schedules and coordinates machine instructions and broadcasts them over the WR network. The TM triggers equipment actions based on the transmitted execution time. Since latencies in the low μs range are required, this paper investigates the possibilities of parallelization in programmable hardware and discusses the benefits to either a distributed or monolithic timing master architecture. The proposed FPGA based TM will meet said timing requirements while providing fast reaction to interlocks and internal events and offers parallel processing of multiple signals and state machines. (authors)

  5. Natural orifice transgastric endoscopic wedge hepatic resection in an experimental model using an intuitively controlled master and slave transluminal endoscopic robot (MASTER).

    Science.gov (United States)

    Phee, S J; Ho, K Y; Lomanto, D; Low, S C; Huynh, V A; Kencana, A P; Yang, K; Sun, Z L; Chung, S C Sydney

    2010-09-01

    The lack of triangulation of standard endoscopic devices limits the degree of freedom for surgical maneuvers during natural orifice transluminal endoscopic surgery (NOTES). This study explored the feasibility of adapting an intuitively controlled master and slave transluminal endoscopic robot (MASTER) the authors developed to facilitate wedge hepatic resection in NOTES. The MASTER consists of a master controller, a telesurgical workstation, and a slave manipulator that holds two end-effectors: a grasper, and a monopolar electrocautery hook. The master controller is attached to the wrist and fingers of the operator and connected to the manipulator by electrical and wire cables. Movements of the operator are detected and converted into control signals driving the slave manipulator via a tendon-sheath power transmission mechanism allowing nine degrees of freedom. Using this system, wedge hepatic resection was performed through the transgastric route on two female pigs under general anesthesia. Entry into the peritoneal cavity was via a 10-mm incision made on the anterior wall of the stomach by the electrocautery hook. Wedge hepatic resection was performed using the robotic grasper and hook. Hemostasis was achieved with the electrocautery hook. After the procedure, the resected liver tissue was retrieved through the mouth using the grasper. Using the MASTER, transgastric wedge hepatic resection was successfully performed on two pigs with no laparoscopic assistance. The entire procedure took 9.4 min (range, 8.5-10.2 min), with 7.1 min (range, 6-8.2 min) spent on excision of the liver tissue. The robotics-controlled device was able to grasp, retract, and excise the liver specimen successfully in the desired plane. This study demonstrated for the first time that the MASTER could effectively mitigate the technical constraints normally encountered in NOTES procedures. With it, the triangulation of surgical tools and the manipulation of tissue became easy, and wedge hepatic

  6. Master of the master gland: Choh Hao Li, the University of California, and science, migration, and race.

    Science.gov (United States)

    Zulueta, Benjamin C

    2009-01-01

    This essay examines the origins of the relationship between Choh Hao Li and the University of California, Berkeley. Li came to the United States from China in 1935 for graduate study at the University of Michigan, but ended up enrolling at Berkeley. Over the course of the next two decades, Li went from being a foreign graduate student in chemistry on a temporary visa to an internationally recognized leader in the biochemistry of endocrinology at the head of his own laboratory and a naturalized citizen of the United States. At what was otherwise a dark time for Americans of Chinese descent, Li was garnering adulation in the popular press. He was called the "master of the master gland" for his successes both in isolating and in synthesizing pituitary hormones. Specifically, the essay explores the making of the "master of the master gland" from the perspectives of the history of science and the history of race and migration in the United States, tracing the interplay among Li's scientific work, his migrations, his career aspirations, and his legal status in the United States. A Chinese intellectual cast adrift by the shifting geopolitics of World War II and the early Cold War, Li danced delicately along the margins of membership in American society during the 1940s, only arriving at what turned out to be his final destination after careful and protracted negotiations with officials of the U.S. government, with influential members of the international scientific community, and with representatives of the University of California, Berkeley.

  7. From master slave interferometry to complex master slave interferometry: theoretical work

    Science.gov (United States)

    Rivet, Sylvain; Bradu, Adrian; Maria, Michael; Feuchter, Thomas; Leick, Lasse; Podoleanu, Adrian

    2018-03-01

    A general theoretical framework is described to obtain the advantages and the drawbacks of two novel Fourier Domain Optical Coherence Tomography (OCT) methods denoted as Master/Slave Interferometry (MSI) and its extension denoted as Complex Master/Slave Interferometry (CMSI). Instead of linearizing the digital data representing the channeled spectrum before a Fourier transform can be applied to it (as in OCT standard methods), channeled spectrum is decomposed on the basis of local oscillations. This replaces the need for linearization, generally time consuming, before any calculation of the depth profile in the range of interest. In this model two functions, g and h, are introduced. The function g describes the modulation chirp of the channeled spectrum signal due to nonlinearities in the decoding process from wavenumber to time. The function h describes the dispersion in the interferometer. The utilization of these two functions brings two major improvements to previous implementations of the MSI method. The paper details the steps to obtain the functions g and h, and represents the CMSI in a matrix formulation that enables to implement easily this method in LabVIEW by using parallel programming with multi-cores.

  8. Inspirational Catalogue of Master Thesis Proposals 2015

    DEFF Research Database (Denmark)

    Thorndahl, Søren

    2015-01-01

    This catalog presents different topics for master thesis projects. It is important to emphasize that the project descriptions only serves as an inspiration and that you always can discuss with the potential supervisors the specific contents of a project.......This catalog presents different topics for master thesis projects. It is important to emphasize that the project descriptions only serves as an inspiration and that you always can discuss with the potential supervisors the specific contents of a project....

  9. Hvorfor master i medborgerskab?

    DEFF Research Database (Denmark)

    Korsgaard, Ove

    2002-01-01

    Danmarks Pædagogiske Universitet planlægger i samarbejde med Syddansk Universitet at udbyde en master i medborgerskab: etisk og demokratisk dannelse. Artiklens forfatter gør rede for nogle af de tanker, der ligger bag uddannelsen, og belyser, hvorfor medborgerskab er blevet et nøglebegreb i nyere...

  10. Enhanced Master Station History Report

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Enhanced Master Station History Report (EMSHR) is a compiled list of basic, historical information for every station in the station history database, beginning...

  11. Master's degree in nuclear engineering by videotaped courses

    International Nuclear Information System (INIS)

    Corradini, M.L.; Vogelsang, W.F.

    1991-01-01

    In 1986, a group of northern midwest utilities met with faculty from the nuclear engineering department at the University of Wisconsin (UW) to discuss the possibility of offering graduate courses by videotape for academic credit and earning a master's degree. Four years later, two utility employees from Northern States Power (NSP) and Wisconsin Electric Power Companies (WEPCO) graduated from the University of Wisconsin with master's degrees earned entirely by taking videotape graduate courses at their individual nuclear power plant sites. Within these 4 years, more than a dozen videotaped graduate courses were developed by the faculty of the department in a formalized master's degree program in nuclear engineering and engineering physics. This paper outlines the program's development and its current features

  12. Master of engineering program for Westinghouse Electric Corporation

    International Nuclear Information System (INIS)

    Klevans, E.H.; Diethorn, W.S.

    1991-01-01

    In August of 1985, Westinghouse Corporation, via a grant to the nuclear engineering department at Pennsylvania State University, provided its professional employees the opportunity to earn a master of engineering (M. Eng.) degree in nuclear engineering in a program of evening study in the Pittsburgh area. Faculty members from the nuclear engineering department, which is 135 miles from Westinghouse, and adjunct faculty from the professional ranks of Westinghouse provided the instruction at the Westinghouse training center facility in Monroeville, Pennsylvania, A 3-yr 30-credit program was originally planned, but this was extended to a fourth year to accommodate the actual student progress toward the degree. A fifth year was added for students to complete their engineering paper. There have been benefits to both Westinghouse and Penn State from this program. Advanced education for its employees has met a Westinghouse need. For Penn State, there has been an increase in interaction with Westinghouse personnel, and this has now led to cooperative research programs with them

  13. Master sintering curves of two different alumina powder compacts

    Directory of Open Access Journals (Sweden)

    Vaclav Pouchly

    2009-12-01

    Full Text Available Concept of Master Sintering Curve is a strong tool for optimizing sintering schedule. The sintering behaviour can be predicted, and sintering activation energy can be calculated with the help of few dilatometric measurements. In this paper an automatic procedure was used to calculate Master Sintering Curves of two different alumina compacts. The sintering activation energies were determined as 640 kJ/mol for alumina with particle size of 240 nm, respective 770 kJ/mol for alumina with particle size of 110 nm. The possibility to predict sintering behaviour with the help of Master Sintering Curve was verified.

  14. Data Quality- and Master Data Management - A Hospital Case.

    Science.gov (United States)

    Arthofer, Klaus; Girardi, Dominic

    2017-01-01

    Poor data quality prevents the analysis of data for decisions which are critical for business. It also has a negative impact on business processes. Nevertheless the maturity level of data quality- and master data management is still insufficient in many organizations nowadays. This article discusses the corresponding maturity of companies and a management cycle integrating data quality- and master data management in a case dealing with benchmarking in hospitals. In conclusion if data quality and master data are not properly managed, structured data should not be acquired in the first place due to the added expense and complexity.

  15. Identification of Vibrio harveyi as a causative bacterium for a tail rot disease of sea bream Sparus aurata from research hatchery in Malta.

    Science.gov (United States)

    Haldar, S; Maharajan, A; Chatterjee, S; Hunter, S A; Chowdhury, N; Hinenoya, A; Asakura, M; Yamasaki, S

    2010-10-20

    A bacterial disease was reported from gilthead sea bream (Sparus aurata) within a hatchery environment in Malta. Symptoms included complete erosion of tail, infection in the eye, mucous secretion and frequent mortality. A total of 540 strains were initially isolated in marine agar from different infected body parts and culture water sources. Subsequently 100 isolates were randomly selected, identified biochemically and all were found to be Vibrio harveyi-related organisms; finally from 100 isolates a total of 13 numbers were randomly selected and accurately identified as V. harveyi by 16S rRNA gene sequencing and species-specific PCR. Ribotyping of these strains with HindIII revealed total of six clusters. In vivo challenge study with representative isolates from each cluster proved two clusters each were highly pathogenic, moderately pathogenic and non-pathogenic. All 13 isolates were positive for hemolysin gene, a potential virulence factor. Further analysis revealed probably a single copy of this gene was encoded in all isolates, although not in the same locus in the genome. Although V. harveyi was reported to be an important pathogen for many aquatic organisms, to our knowledge this might be the first report of disease caused by V. harveyi and their systematic study in the sea bream hatchery from Malta. Copyright © 2009 Elsevier GmbH. All rights reserved.

  16. Concept for a large master/slave-controlled robotic hand

    Science.gov (United States)

    Grissom, William A.; Abdallah, Mahmoud A.; White, Carl L.

    1988-01-01

    A strategy is presented for the design and construction of a large master/slave-controlled, five-finger robotic hand. Each of the five fingers will possess four independent axes each driven by a brushless DC servomotor and, thus, four degrees-of-freedom. It is proposed that commercially available components be utilized as much as possible to fabricate a working laboratory model of the device with an anticipated overall length of two-to-four feet (0.6 to 1.2 m). The fingers are to be designed so that proximity, tactile, or force/torque sensors can be imbedded in their structure. In order to provide for the simultaneous control of the twenty independent hand joints, a multilevel master/slave control strategy is proposed in which the operator wears a specially instrumented glove which produces control signals corresponding to the finger configurations and which is capable of conveying sensor feedback signals to the operator. Two dexterous hand master devices are currently commercially available for this application with both undergoing continuing development. A third approach to be investigated for the master control mode is the use of real-time image processing of a specially patterned master glove to provide the respective control signals for positioning the multiple finger joints.

  17. Mastering Apache Cassandra

    CERN Document Server

    Neeraj, Nishant

    2013-01-01

    Mastering Apache Cassandra is a practical, hands-on guide with step-by-step instructions. The smooth and easy tutorial approach focuses on showing people how to utilize Cassandra to its full potential.This book is aimed at intermediate Cassandra users. It is best suited for startups where developers have to wear multiple hats: programmer, DevOps, release manager, convincing clients, and handling failures. No prior knowledge of Cassandra is required.

  18. Open Planning: A Case Study in Educational Change.

    Science.gov (United States)

    Cadwallader, Mervyn L.

    1983-01-01

    The University of Wisconsin-Platteville needed something that would stimulate a mode of analysis and planning. The answer was something called a "Productivity Level Audit Through the Master Profile" (PLATT MAP). It grew from a sheet of paper to a gigantic display of data about the state of the campus (MLW)

  19. Logistics Automation Master Plan (LAMP). Better Logistics Support through Automation.

    Science.gov (United States)

    1983-06-01

    productivity and efficiency of DARCOM human resources through the design, development, and deployment of workspace automation tools. 16. Develop Area Oriented...See Resource Annex Budgeted and Programed Resources by FY: See Resource Annex Actual or Planned Source of Resources: See Resourece Annex. Purpose and...screen, video disc machine and a microcomputer. Pressure from a human hand or light per on the user friendly screen tells the computer to retrieve

  20. MIDAS [Master Information and Data Acquisition System

    International Nuclear Information System (INIS)

    Ball, D.L.

    1986-01-01

    The Master Information and Data Acquisition System (MIDAS) is a computerized work control system that provides 24-hour, real-time access to plant equipment information and work package status. It is used in the 400 Area of the Department of Energy (DOE) Hanford Site in Richland, Washington. MIDAS was originally created to aid in the release and control of work at the Fast Flux Test Facility (FFTF), which is operated by the Westinghouse Hanford Company for the DOE. After MIDAS performed that function at FFTF successfully for over two years, its role was expanded to provide similar functions for other facilities supporting the LMR mission. Through its ability to provide online, accurate information on plant components, safety criteria, and work package status, MIDAS reinforces Operations functions and the control and authorization of maintenance activities in the FFTF plant and in other related facilities. Thus, MIDAS enhances the operational safety, as well as the planning and scheduling process for these facilities. MIDAS consists of three parts: The Plant Tracking System (PTS), the Work Control Log (WCL), and the MIDAS Component Indices