WorldWideScience

Sample records for handling fleet operations

  1. Cask fleet operations study

    International Nuclear Information System (INIS)

    1988-01-01

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system

  2. Fleet Sizing of Automated Material Handling Using Simulation Approach

    Science.gov (United States)

    Wibisono, Radinal; Ai, The Jin; Ratna Yuniartha, Deny

    2018-03-01

    Automated material handling tends to be chosen rather than using human power in material handling activity for production floor in manufacturing company. One critical issue in implementing automated material handling is designing phase to ensure that material handling activity more efficient in term of cost spending. Fleet sizing become one of the topic in designing phase. In this research, simulation approach is being used to solve fleet sizing problem in flow shop production to ensure optimum situation. Optimum situation in this research means minimum flow time and maximum capacity in production floor. Simulation approach is being used because flow shop can be modelled into queuing network and inter-arrival time is not following exponential distribution. Therefore, contribution of this research is solving fleet sizing problem with multi objectives in flow shop production using simulation approach with ARENA Software

  3. A cask fleet operations study

    International Nuclear Information System (INIS)

    1988-03-01

    This document describes the cask fleet currently available to transport spent nuclear fuels. The report describes the proposed operational procedures for these casks and the vehicles intended to transport them. Included are techniques for loading the cask, lifting it onto the transport vehicle, preparing the invoices, and unloading the cask at the destination. The document concludes with a discussion on the maintenance and repair of the casks. (tem) 29 figs

  4. Retrofitting bus fleet for natural gas operation

    International Nuclear Information System (INIS)

    Stella, E.; Foresti, P.

    1992-01-01

    Buses, operating within a Florence (Italy) municipal transportation system, and equipped with Otto cycle engines, were selected for retrofitting taking into account the suitability of each vehicle's specific routing and service requirements. Cost benefit analyses indicated that it wouldn't be economically feasible to retrofit buses equipped with diesel engines. A computerized refuelling system was set up at the fleet's central service station which was hooked up to the natural gas utility's supply line. This paper tables the cost benefit analysis data comparing gasoline and methane operation and reflecting the cost savings which are expected to be accrued through this methanization program over a span of 14 years

  5. Research on Operational Aspects of Large Autonomous Underwater Glider Fleets

    National Research Council Canada - National Science Library

    Fratantoni, David M

    2007-01-01

    This program supported research on the operational and management issues stemming from application of large fleets of autonomous underwater gliders to oceanographic research and rapid environmental...

  6. Fleet DNA: Commercial Fleet Vehicle Operating Data | Transportation

    Science.gov (United States)

    Charts Related Studies Learn more about the operation of delivery vans through these studies. Hydraulic beverage delivery trucks ranging in size from class 3 to class 7 with primary vocations of delivering Charts Related Studies Learn more about the operation of delivery trucks through these studies. In-Use

  7. Fleet operator risks for using fleets for V2G regulation

    International Nuclear Information System (INIS)

    Hill, Davion M.; Agarwal, Arun S.; Ayello, Francois

    2012-01-01

    Future fleets of vehicles may include electric vehicles (EVs) or hybrid electric vehicles (HEVs) because of potential fuel savings. Recent demonstration of diesel parallel hybrids in a delivery fleet led to fuel economy improvements, and hybrid bus demonstrations exhibited twice the fuel economy of the conventional bus. Fleet ownership may include management of a fleet of vehicles as small as 10 units and as large as hundreds or thousands. In addition to fuel savings, the newer extended range electric vehicles (EREVs) and pure EVs permit vehicle to grid (V2G) opportunities. These V2G opportunities may present additional revenue for fleets by providing ancillary services to local grid independent system operators (ISOs), provided that the burden of driving and V2G services do not accelerate the degradation of the battery systems in these vehicles. The subject of this study is to determine the financial risks associated with accelerated battery degradation in a V2G-enabled EREV fleet expected to perform ancillary service duty while charging in addition to the normal loads of drive cycle duty. We determine that battery cycle life during V2G duty is a critical parameter, which can determine whether or not the business model is viable. - Highlights: ► V2G regulation cycle life of EREV batteries must be >50,000 cycles to be profitable. ► Present knowledge and test data about the impact of V2G cycles on battery life are limited. ► Replacement of batteries and energy throughput are major factors in the cost–benefit analysis. ► V2G fleet is not viable with present data but can be viable with some technical advancement.

  8. Field Operations Program Neighborhood Electric Vehicles - Fleet Survey

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, James Edward; Carroll, M.

    2001-07-01

    This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles(NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog- forming emissions annually.

  9. Field Operations Program - Neighborhood Electric Vehicle Fleet Use

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J. E.; Carroll, M. R.

    2001-07-02

    This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles (NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog-forming emissions annually.

  10. 48 CFR 970.2307-1 - Motor vehicle fleet operations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Motor vehicle fleet..., Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2307-1 Motor vehicle fleet... that the Federal motor vehicle fleet will serve as an example and provide a leadership role in the...

  11. Radioactive Legacy of the Russian Pacific Fleet Operations. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Compton, K. L.; Novikov, V.M.; Parker, F.L.; Sivintsev, Y.U.

    2003-03-25

    There have been extensive studies of the current and potential environmental impact of Russian Northern fleet activities. However, despite the fact that the total number of ships in both fleets are comparable, there have been very few studies published in the open literature of the impact of the Pacific fleet. This study of the Pacific fleet's impact on neighboring countries was undertaken to partially remedy this lack of analysis. This study is focused on an evaluation of the inventory of major sources of radioactive material associated with the decommissioning of nuclear submarines, and an evaluation of releases to the atmosphere and their long-range (>100km) transboundary transport.

  12. Vehicular fleet operation on natural gas and propane: An overview. Final research report

    International Nuclear Information System (INIS)

    Taylor, D.B.; Mahmassani, H.; Euritt, M.A.

    1992-11-01

    The report attempts to contribute to the timely area of alternative vehicular fuels. It addresses the analysis of fleet operation on alternative fuels, specifically compressed natural gas (CNG) and propane, in terms of both fleet economics and societal impacts. Comprehensive information on engine technology, fueling infrastructure design, and societal impacts are presented. An evaluation framework useful for decisions between any vehicular fuels is developed. The comprehensive fleet cost-effectiveness analysis framework used in previous Project 983 reports is discussed in great detail. This framework/model is flexible enough to allow substantial sensitivity and scenario analysis. The model is used to perform sample analyses of both fleet economic and societal impacts

  13. Repository waste-handling operations, 1998

    International Nuclear Information System (INIS)

    Cottam, A.E.; Connell, L.

    1986-04-01

    The Civilian Radioactive Waste Management Program Mission Plan and the Generic Requirements for a Mined Geologic Disposal System state that beginning in 1998, commercial spent fuel not exceeding 70,000 metric tons of heavy metal, or a quantity of solidified high-level radioactive waste resulting from the reprocessing of such a quantity of spent fuel, will be shipped to a deep geologic repository for permanent storage. The development of a waste-handling system that can process 3000 metric tons of heavy metal annually will require the adoption of a fully automated approach. The safety and minimum exposure of personnel will be the prime goals of the repository waste handling system. A man-out-of-the-loop approach will be used in all operations including the receipt of spent fuel in shipping casks, the inspection and unloading of the spent fuel into automated hot-cell facilities, the disassembly of spent fuel assemblies, the consolidation of fuel rods, and the packaging of fuel rods into heavy-walled site-specific containers. These containers are designed to contain the radionuclides for up to 1000 years. The ability of a repository to handle more than 6000 pressurized water reactor spent-fuel rods per day on a production basis for approximately a 23-year period will require that a systems approach be adopted that combines space-age technology, robotics, and sophisticated automated computerized equipment. New advanced inspection techniques, maintenance by robots, and safety will be key factors in the design, construction, and licensing of a repository waste-handling facility for 1998

  14. Remaining useful life estimation in heterogeneous fleets working under variable operating conditions

    International Nuclear Information System (INIS)

    Al-Dahidi, Sameer; Di Maio, Francesco; Baraldi, Piero; Zio, Enrico

    2016-01-01

    The availability of condition monitoring data for large fleets of similar equipment motivates the development of data-driven prognostic approaches that capitalize on the information contained in such data to estimate equipment Remaining Useful Life (RUL). A main difficulty is that the fleet of equipment typically experiences different operating conditions, which influence both the condition monitoring data and the degradation processes that physically determine the RUL. We propose an approach for RUL estimation from heterogeneous fleet data based on three phases: firstly, the degradation levels (states) of an homogeneous discrete-time finite-state semi-markov model are identified by resorting to an unsupervised ensemble clustering approach. Then, the parameters of the discrete Weibull distributions describing the transitions among the states and their uncertainties are inferred by resorting to the Maximum Likelihood Estimation (MLE) method and to the Fisher Information Matrix (FIM), respectively. Finally, the inferred degradation model is used to estimate the RUL of fleet equipment by direct Monte Carlo (MC) simulation. The proposed approach is applied to two case studies regarding heterogeneous fleets of aluminium electrolytic capacitors and turbofan engines. Results show the effectiveness of the proposed approach in predicting the RUL and its superiority compared to a fuzzy similarity-based approach of literature. - Highlights: • The prediction of the remaining useful life for heterogeneous fleets is addressed. • A data-driven prognostics approach based on a Markov model is proposed. • The proposed approach is applied to two different heterogeneous fleets. • The results are compared with those obtained by a fuzzy similarity-based approach.

  15. Fuel operation of EDF nuclear fleet presentation of the centralized organization for operational engineering at the nuclear generation division

    International Nuclear Information System (INIS)

    Paulin, Ph.

    2006-01-01

    The main feature of EDF Nuclear Fleet is the standardization, with 'series' of homogeneous plants (same equipment, fuel and operation technical documents). For fuel operation, this standardization is related to the concept of 'fuel management scheme' (typical fuel reloads with fixed number and enrichment of fresh assemblies) for a whole series of plants. The context of the Nuclear Fleet lead to the choice of a centralized organization for fuel engineering at the Nuclear Generation Division (DPN), located at UNIPE (National Department for Fleet Operation Engineering) in Lyon. The main features of this organization are the following: - Centralization of the engineering activities for fuel operation support in the Fuel Branch of UNIPE, - Strong real-time link with the nuclear sites, - Relations with various EDF Departments in charge of design, nuclear fuel supply and electricity production optimization. The purposes of the organization are: - Standardization of operational engineering services and products, - Autonomy with independent methods and computing tools, - Reactivity with a technical assistance for sites (24 hours 'hot line'), - Identification of different levels (on site and off site) to solve core operation problems, - Collection, analysis and valorization of operation feedback, - Contribution to fuel competence global management inside EDF. This paper briefly describes the organization. The main figures of annual engineering production are provided. A selection of examples illustrates the contribution to the Nuclear Fleet performance. (authors)

  16. Waste minimization, recycling and reuse in operations support services fleet maintenance

    International Nuclear Information System (INIS)

    Trego, A.L.

    1994-01-01

    Government regulations and smart business practices demand that organizations dramatically reduce both the type and volume of waste generated by their operations. This article describes successful waste minimization and recycling programs created by the Fleet Maintenance, Operations Support Services Division, Westinghouse Hanford Company. These comprehensive programs have greatly reduced waste formerly produced in maintaining 3,528 government-owned vehicles and nearly 200 emergency power generators at the Hanford Site. The actions are integral to preventing future contamination of the Site as well as to cleaning up the complexity of wastes from almost 50 years of defense production. The results of the Fleet Maintenance programs are impressive, recording cost savings of $290,000 in fiscal year 1993 and $965,000 since 1988

  17. A Perspective on Remote Handling Operations and Human Machine Interface for Remote Handling in Fusion

    International Nuclear Information System (INIS)

    Haist, B.; Hamilton, D.; Sanders, St.

    2006-01-01

    A large-scale fusion device presents many challenges to the remote handling operations team. This paper is based on unique operational experience at JET and gives a perspective on remote handling task development, logistics and resource management, as well as command, control and human-machine interface systems. Remote operations require an accurate perception of a dynamic environment, ideally providing the operators with the same unrestricted knowledge of the task scene as would be available if they were actually at the remote work location. Traditional camera based systems suffer from a limited number of viewpoints and also degrade quickly when exposed to high radiation. Virtual Reality and Augmented Reality software offer great assistance. The remote handling system required to maintain a tokamak requires a large number of different and complex pieces of equipment coordinating to perform a large array of tasks. The demands on the operator's skill in performing the tasks can escalate to a point where the efficiency and safety of operations are compromised. An operations guidance system designed to facilitate the planning, development, validation and execution of remote handling procedures is essential. Automatic planning of motion trajectories of remote handling equipment and the remote transfer of heavy loads will be routine and need to be reliable. This paper discusses the solutions developed at JET in these areas and also the trends in management and presentation of operational data as well as command, control and HMI technology development offering the potential to greatly assist remote handling in future fusion machines. (author)

  18. Transition of R&D into Operations at Fleet Numerical Meteorology and Oceanography Center

    Science.gov (United States)

    Clancy, R. M.

    2006-12-01

    The U.S. Navy's Fleet Numerical Meteorology and Oceanography Center (FNMOC) plays a significant role in the National capability for operational weather and ocean prediction through its operation of sophisticated global and regional meteorological and oceanographic models, extending from the top of the atmosphere to the bottom of the ocean. FNMOC uniquely satisfies the military's requirement for a global operational weather prediction capability based on software certified to DoD Information Assurance standards and operated in a secure classified computer environment protected from outside intrusion by DoD certified firewalls. FNMOC operates around-the-clock, 365 days per year and distributes products to military and civilian users around the world, both ashore and afloat, through a variety of means. FNMOC's customers include all branches of the Department of Defense, other government organizations such as the National Weather Service, private companies, a number of colleges and universities, and the general public. FNMOC employs three primary models, the Navy Operational Global Atmospheric Prediction System (NOGAPS), the Coupled Ocean/Atmosphere Mesoscale Prediction System (COAMPS), and the WaveWatch III model (WW3), along with a number of specialized models and related applications. NOGAPS is a global weather model, driving nearly all other FNMOC models and applications in some fashion. COAMPS is a high- resolution regional model that has proved to be particularly valuable for forecasting weather and ocean conditions in highly complex coastal areas. WW3 is a state-of-the-art ocean wave model that is employed both globally and regionally in support of a wide variety of naval operations. Other models support and supplement the main models with predictions of ocean thermal structure, ocean currents, sea-ice characteristics, and other data. Fleet Numerical operates at the leading edge of science and technology, and benefits greatly from collocation with its supporting

  19. Flight Dynamics Operations Management of the Large and Heterogeneous Eutelsat Fleet of Commercial Satellites

    Science.gov (United States)

    Bellido, E.

    The EUTELSAT FDU (Flight Dynamics Unit) manages the resources to perform the typical activities of the large satellite operators and faces the usual difficulties raising from a vast and heterogeneous fleet. At present 20 satellites from 9 different platforms/sub-platforms are controlled from our Satellite Control Centre. The FDU was created in 2002 with the aim to respond to the operational needs of a growing fleet in terms of number of satellites and activities. It is at present composed of 6 engineering staff with the objective to provide operations service covering the whole lifecycle of the satellites from the procurement phase till the decommissioning. The most demanding activity is the daily operations, which must ensure maximum safety and continuity of service with the highest efficiency. Solutions have been applied from different areas: management, structure, operations organisation, processes, facilities, quality standards, etc. In addition to this, EUTELSAT is a growing communications operator and the FDU needs to contribute to the global objectives of the company. This paper covers our approach.

  20. Conceptual design report for a remotely operated cask handling system

    International Nuclear Information System (INIS)

    Yount, J.A.; Berger, J.D.

    Recent advances in remote handling utilizing commercial robotics are conceptually applied to the problem of lowering operator cumulative dose and increasing throughput during cask handling operations in proposed nuclear waste container shipping and receiving facilities. The functional criteria for each subsystem are defined, and candidate systems are described. The report also contains a generic description of a waste receiving facility, to show possible deployment configurations for the equipment

  1. Optimization and control method for smart charging of EVs facilitated by Fleet operator

    DEFF Research Database (Denmark)

    Hu, Junjie; You, Shi; Si, Chengyong

    2013-01-01

    the energy during the period of high electricity penetration and feed the electricity back into the grid when the demand is high or in situations of insufficient electricity generation. However, the extra loads created by increasing EVs may have adverse impacts on grid. These factors will bring new......-tion and the facilitator EV fleet operator are introduced. Secondly, control architec-tures and their integrations in term of electricity market and distribution grid are discussed. Then, data analysis of EVs including a battery model and driving pattern is presented. Further discussion is given on mathematical modelling...

  2. Spent fuel cask handling at an operating nuclear power plant

    International Nuclear Information System (INIS)

    Pal, A.C.

    1988-01-01

    The importance of spent fuel handling at operating nuclear power plants cannot be overstated. Because of its highly radioactive nature, however, spent fuel must be handled in thick, lead-lined containers or casks. Thus, all casks for spent fuel handling are heavy loads by the US Nuclear Regulatory Commission's definition, and any load-drop must be evaluated for its potential to damage safety-related equipment. Nuclear Regulatory Guide NUREG-0612 prescribes the regulatory requirements of alternative heavy-load-handling methodologies such as (a) by providing cranes that meet the requirements of NUREG-0554, which shall be called the soft path, or (b) by providing protective devices at all postulated load-drop areas to prevent any damage to safety-related equipment, which shall be called the hard path. The work reported in this paper relates to cask handling at New York Power Authority's James A. FitzPatrick (JAF) plant

  3. Preliminary investigation Area 12 fleet operations steam cleaning discharge area Nevada Test Site

    International Nuclear Information System (INIS)

    1996-07-01

    This report documents the characterization activities and findings of a former steam cleaning discharge area at the Nevada Test Site. The former steam cleaning site is located in Area 12 east of Fleet Operations Building 12-16. The characterization project was completed as a required condition of the ''Temporary Water Pollution Control Permit for the Discharge From Fleet Operations Steam Cleaning Facility'' issued by the Nevada Division of Environmental Protection. The project objective was to collect shallow soil samples in eight locations in the former surface discharge area. Based upon field observations, twelve locations were sampled on September 6, 1995 to better define the area of potential impact. Samples were collected from the surface to a depth of approximately 0.3 meters (one foot) below land surface. Discoloration of the surface soil was observed in the area of the discharge pipe and in localized areas in the natural drainage channel. The discoloration appeared to be consistent with the topographically low areas of the site. Hydrocarbon odors were noted in the areas of discoloration only. Samples collected were analyzed for bulk asbestos, Toxicity Characteristic Leaching Procedure (TCLP) metals, total petroleum hydrocarbons (TPHs), volatile organic compounds (VOCs), semi-volatile organic compounds (Semi-VOCs), and gamma scan

  4. Fleet DNA Brings Fleet Data to Life, Informs R&D | News | NREL

    Science.gov (United States)

    Fleet DNA Brings Fleet Data to Life, Informs R&D Fleet DNA Brings Fleet Data to Life, Informs R De La Rosa, NREL 34672 The Fleet DNA clearinghouse of commercial vehicle operations data features Odyne-have tapped into Fleet DNA." The data-driven insight and decision-making capabilities

  5. JOYO operation support system 'JOYCAT' based on intelligent alarm handling

    International Nuclear Information System (INIS)

    Tamaoki, Tetsuo; Yamamoto, Hiroki; Sato, Masuo; Yoshida, Megumu; Kaneko, Tomoko; Terunuma, Seiichi; Takatsuto, Hiroshi; Morimoto, Makoto.

    1992-01-01

    An operation support system for the experimental fast reactor 'JOYO' was developed based on an intelligent alarm-handling. A specific feature of this system, called JOYCAT (JOYO Consulting and Analyzing Tool), is in its sequential processing structure that a uniform treatment by using design knowledge base is firstly applied for all activated alarms, and an exceptional treatment by using heuristic knowledge base is then applied only for the former results. This enables us to achieve real-time and flexible alarm-handling. The first alarm-handling determines the candidates of causal alarms, important alarms with which the operator should firstly cope, through identifying the cause-consequence relations among alarms based on the design knowledge base in which importance and activating conditions are described for each of 640 alarms in a frame format. The second alarm-handling makes the final judgement with the candidates by using the heuristic knowledge base described as production rules. Then, operation manuals concerning the most important alarms are displayed to operators. JOYCAT has been in commission since September of 1990, after a wide scope of validation tests by using an on-site full-scope training simulator. (author)

  6. Computerised programming of the Dragon reactor fuel handling operations

    International Nuclear Information System (INIS)

    Butcher, P.

    1976-11-01

    Two suites of FORTRAN IV computer programs have been written to produce check lists for the operation of the two remote control fuel handling machines of the Dragon Reactor. This document describes the advantages of these programs over the previous manual system of writing check lists, and provides a detailed guide to the programs themselves. (author)

  7. Automated handling for SAF batch furnace and chemistry analysis operations

    International Nuclear Information System (INIS)

    Bowen, W.W.; Sherrell, D.L.; Wiemers, M.J.

    1981-01-01

    The Secure Automated Fabrication Program is developing a remotely operated breeder reactor fuel pin fabrication line. The equipment will be installed in the Fuels and Materials Examination Facility being constructed at Hanford, Washington. Production is scheduled to start in mid-1986. The application of small pneumatically operated industrial robots for loading and unloading product into and out of batch furnaces and for distribution and handling of chemistry samples is described

  8. Design Knowledge and Design Change Management in the Operation of Nuclear Fleets

    International Nuclear Information System (INIS)

    Pelin, H.

    2016-01-01

    Full text: The operating lifetime of a nuclear plant spans several decades. During this time, the plant may undergo design changes resulting from experience feedback, new knowledge or requirements, and safety reviews. To ensure that safety remains optimized, these changes must be carried out with a full understanding of and without compromising the design intent. The licensee holds prime responsibility for the safety of the plant, and fully responsible for design change management. It fulfils this responsibility by establishing a formal system for ensuring the safety of the plant design throughout its lifetime, which includes establishing a formally designated entity within its management system, referred to as the Design Authority. The establishment of a Design Authority may be challenging for many operators. Therefore the licensee may allocate tasks to external organizations—the original designers—that have a specialized knowledge of specific parts of the plant, including vendors and equipment suppliers. Utilities operating plants of similar design should take advantage of this similarity to manage their knowledge through an international fleet-wide approach, facilitating sharing of experience and enabling similar solutions to be adopted for design changes. Opportunities for exchanges brought by owners’ groups, and other operators’ groups should be fully developed. (author

  9. Controlling fugitive dust emissions in material handling operations

    Energy Technology Data Exchange (ETDEWEB)

    Tooker, G E

    1992-05-01

    The primary mechanism of fugitive dust generation in bulk material handling transfer operations is by dispersion of dust in turbulent air induced to flow with falling or projected material streams. This paper returns to basic theories of particle dynamics and fluid mechanics to quantify the dust generating mechanism by rational analysis. Calculations involving fluid mechanisms are made easier by the availability of the personal computer and the many math manipulating programs. Rational analysis is much more cost effective when estimating collection air volumes to control fugitive emissions; especially in enclosed material handling transfers transporting large volumes of dusty material. Example calculations, using a typical enclosed conveyor-to-conveyor transfer operation are presented to illustrate and highlight the key parameters that determine the magnitude of induced air flow that must be controlled. The methods presented in this paper for estimating collection air volumes apply only enclosed material handling transfers, exhausted to a dust collector. Since some assistance to the control of dust emissions must be given by the material handling transfer chute design, a discussion of good transfer chute design practice is presented. 4 refs., 2 figs., 2 tabs.

  10. An analysis of repository waste-handling operations

    International Nuclear Information System (INIS)

    Dennis, A.W.

    1990-09-01

    This report has been prepared to document the operational analysis of waste-handling facilities at a geologic repository for high-level nuclear waste. The site currently under investigation for the geologic repository is located at Yucca Mountain, Nye County, Nevada. The repository waste-handling operations have been identified and analyzed for the year 2011, a steady-state year during which the repository receives spent nuclear fuel containing the equivalent of 3000 metric tons of uranium (MTU) and defense high-level waste containing the equivalent of 400 MTU. As a result of this analysis, it has been determined that the waste-handling facilities are adequate to receive, prepare, store, and emplace the projected quantity of waste on an annual basis. In addition, several areas have been identified where additional work is required. The recommendations for future work have been divided into three categories: items that affect the total waste management system, operations within the repository boundary, and the methodology used to perform operational analyses for repository designs. 7 refs., 48 figs., 11 tabs

  11. Remotely-operated equipment for inspection, measurement and handling

    CERN Document Server

    Bertone, C; CERN. Geneva. TS Department

    2008-01-01

    As part of the application of ALARA radiation dose reduction principles at CERN, inspection, measurement and handling interventions in controlled areas are being studied in detail. A number of activities which could be carried out as remote operations have already been identified and equipment is being developed. Example applications include visual inspection to check for ice formation on LHC components or water leaks, measurement of radiation levels before allowing personnel access, measurement of collimator or magnet alignment, visual inspection or measurements before fire service access in the event of fire, gas leak or oxygen deficiency. For these applications, a modular monorail train, TIM, has been developed with inspection and measurement wagons. In addition TIM provides traction, power and data communication for lifting and handling units such as the remote collimator exchange module and vision for other remotely operated units such as the TAN detector exchange mini-cranes. This paper describes the eq...

  12. Alarm handling systems and techniques developed to match operator tasks

    Energy Technology Data Exchange (ETDEWEB)

    Bye, A; Moum, B R [Institutt for Energiteknikk, Halden (Norway). OECD Halden Reaktor Projekt

    1997-09-01

    This paper covers alarm handling methods and techniques explored at the Halden Project, and describes current status on the research activities on alarm systems. Alarm systems are often designed by application of a bottom-up strategy, generating alarms at component level. If no structuring of the alarms is applied, this may result in alarm avalanches in major plant disturbances, causing cognitive overload of the operator. An alarm structuring module should be designed using a top-down approach, analysing operator`s tasks, plant states, events and disturbances. One of the operator`s main tasks during plant disturbances is status identification, including determination of plant status and detection of plant anomalies. The main support of this is provided through the alarm systems, the process formats, the trends and possible diagnosis systems. The alarm system should both physically and conceptually be integrated with all these systems. 9 refs, 5 figs.

  13. Optimal Scheduling and Operating Target (OPTAR) Cost Model for Aircraft Carriers in the Fleet Response Plan

    National Research Council Canada - National Science Library

    York, Michael A

    2008-01-01

    .... This capability is developed through the Fleet Readiness Training Plan (FRTP) where the Navy's carriers are scheduled in staggered 32-month cycles consisting of four phases of progressive readiness levels...

  14. Advanced operator interface design for CANDU-3 fuel handling system

    International Nuclear Information System (INIS)

    Arapakota, D.

    1995-01-01

    The Operator Interface for the CANDU 3 Fuel Handling (F/H) System incorporates several improvements over the existing designs. A functionally independent sit-down CRT (cathode-ray tube) based Control Console is provided for the Fuel Handling Operator in the Main Control Room. The Display System makes use of current technology and provides a user friendly operator interface. Regular and emergency control operations can be carried out from this control console. A stand-up control panel is provided as a back-up with limited functionality adequate to put the F/H System in a safe state in case of an unlikely non-availability of the Plant Display System or the F/H Control System'. The system design philosophy, hardware configuration and the advanced display system features are described in this paper The F/H Operator Interface System developed for CANDU 3 can be adapted to CANDU 9 as well as to the existing stations. (author)

  15. Advanced operator interface design for CANDU-3 fuel handling system

    Energy Technology Data Exchange (ETDEWEB)

    Arapakota, D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada)

    1996-12-31

    The Operator Interface for the CANDU 3 Fuel Handling (F/H) System incorporates several improvements over the existing designs. A functionally independent sit-down CRT (cathode-ray tube) based Control Console is provided for the Fuel Handling Operator in the Main Control Room. The Display System makes use of current technology and provides a user friendly operator interface. Regular and emergency control operations can be carried out from this control console. A stand-up control panel is provided as a back-up with limited functionality adequate to put the F/H System in a safe state in case of an unlikely non-availability of the Plant Display System or the F/H Control System`. The system design philosophy, hardware configuration and the advanced display system features are described in this paper The F/H Operator Interface System developed for CANDU 3 can be adapted to CANDU 9 as well as to the existing stations. (author).

  16. Green supply chain management using the queuing theory to handle congestion and reduce energy consumption and emissions from supply chain transportation fleet

    Directory of Open Access Journals (Sweden)

    Arvin Aziziankohan

    2017-05-01

    Full Text Available Purpose: Nowadays, governments and people pay more attention to use green products due to environmental pollution, irreplaceable energy and shortage of resources. Green products are resulted from the application of green supply chain management strategies to the organizations' performance strategies, so that we can reduce environmental pollutants and wastes and take a step towards saving energy with limited resources. Methodology:  In this paper, the effect of reducing energy consumption in green supply chain is examined by using queuing theory and transportation models. Data was generated and solved by a commercial optimization epackage. Findings:  The findings indicate that suitable assignment of existing transportation fleet with specified capacity, and using queueing theory in a closed-loop network to reduce the queue length and handle congestion, can cause a reduction in energy consumption by optimizing transportation and waiting times in a green supply chain. Originality/value: Adopting investment strategy in improving the environmental performance of the supply chain, will yield in many advantages and benefits. This article investigates the effect of queuing theory on reducing waiting time, optimizing energy consumption in green supply chain, and consequently decreasing pollution.

  17. Green supply chain management using the queuing theory to handle congestion and reduce energy consumption and emissions from supply chain transportation fleet

    International Nuclear Information System (INIS)

    Aziziankohan, A.; Jolai, F.; Khalilzadeh, M.; Soltani, R.; Tavakkoli-Moghaddam, R.

    2017-01-01

    Purpose: Nowadays, governments and people pay more attention to use green products due to environmental pollution, irreplaceable energy and shortage of resources. Green products are resulted from the application of green supply chain management strategies to the organizations' performance strategies, so that we can reduce environmental pollutants and wastes and take a step towards saving energy with limited resources. Methodology: In this paper, the effect of reducing energy consumption in green supply chain is examined by using queuing theory and transportation models. Data was generated and solved by a commercial optimization epackage. Findings: The findings indicate that suitable assignment of existing transportation fleet with specified capacity, and using queueing theory in a closed-loop network to reduce the queue length and handle congestion, can cause a reduction in energy consumption by optimizing transportation and waiting times in a green supply chain. Originality/value: Adopting investment strategy in improving the environmental performance of the supply chain, will yield in many advantages and benefits. This article investigates the effect of queuing theory on reducing waiting time, optimizing energy consumption in green supply chain, and consequently decreasing pollution.

  18. Green supply chain management using the queuing theory to handle congestion and reduce energy consumption and emissions from supply chain transportation fleet

    Energy Technology Data Exchange (ETDEWEB)

    Aziziankohan, A.; Jolai, F.; Khalilzadeh, M.; Soltani, R.; Tavakkoli-Moghaddam, R.

    2017-07-01

    Purpose: Nowadays, governments and people pay more attention to use green products due to environmental pollution, irreplaceable energy and shortage of resources. Green products are resulted from the application of green supply chain management strategies to the organizations' performance strategies, so that we can reduce environmental pollutants and wastes and take a step towards saving energy with limited resources. Methodology: In this paper, the effect of reducing energy consumption in green supply chain is examined by using queuing theory and transportation models. Data was generated and solved by a commercial optimization epackage. Findings: The findings indicate that suitable assignment of existing transportation fleet with specified capacity, and using queueing theory in a closed-loop network to reduce the queue length and handle congestion, can cause a reduction in energy consumption by optimizing transportation and waiting times in a green supply chain. Originality/value: Adopting investment strategy in improving the environmental performance of the supply chain, will yield in many advantages and benefits. This article investigates the effect of queuing theory on reducing waiting time, optimizing energy consumption in green supply chain, and consequently decreasing pollution.

  19. Alarm handling systems and techniques developed to match operator tasks

    International Nuclear Information System (INIS)

    Bye, A.; Moum, B.R.

    1997-01-01

    This paper covers alarm handling methods and techniques explored at the Halden Project, and describes current status on the research activities on alarm systems. Alarm systems are often designed by application of a bottom-up strategy, generating alarms at component level. If no structuring of the alarms is applied, this may result in alarm avalanches in major plant disturbances, causing cognitive overload of the operator. An alarm structuring module should be designed using a top-down approach, analysing operator's tasks, plant states, events and disturbances. One of the operator's main tasks during plant disturbances is status identification, including determination of plant status and detection of plant anomalies. The main support of this is provided through the alarm systems, the process formats, the trends and possible diagnosis systems. The alarm system should both physically and conceptually be integrated with all these systems. 9 refs, 5 figs

  20. Fleet DNA Brings Fleet Data to Life, Informs R&D | NREL

    Science.gov (United States)

    Fleet DNA Brings Fleet Data to Life, Informs R&D Science and Technology Highlights Highlights in Research & Development Fleet DNA Brings Fleet Data to Life, Informs R&D Key Research Results Achievement Built on over 11.5 million miles of vehicle operations data, Fleet DNA helps users

  1. Fuel Property, Emission Test, and Operability Results from a Fleet of Class 6 Vehicles Operating on Gas-to-Liquid Fuel and Catalyzed Diesel Particle Filters

    Energy Technology Data Exchange (ETDEWEB)

    Alleman, T. L.; Eudy, L.; Miyasato, M.; Oshinuga, A.; Allison, S.; Corcoran, T.; Chatterjee, S.; Jacobs, T.; Cherrillo, R. A.; Clark, R.; Virrels, I.; Nine, R.; Wayne, S.; Lansing, R.

    2005-11-01

    A fleet of six 2001 International Class 6 trucks operating in southern California was selected for an operability and emissions study using gas-to-liquid (GTL) fuel and catalyzed diesel particle filters (CDPF). Three vehicles were fueled with CARB specification diesel fuel and no emission control devices (current technology), and three vehicles were fueled with GTL fuel and retrofit with Johnson Matthey's CCRT diesel particulate filter. No engine modifications were made.

  2. Highly active vitrification plant remote handling operational experience and improvements

    International Nuclear Information System (INIS)

    Milgate, I.

    1996-01-01

    All the main process plant and equipment at the Sellafield Waste Vitrification Plant (WVP) is enclosed in heavily shielded concrete walled cells. There is a large quantity of relatively complex plant and equipment which must be remotely operated, maintained or replaced in-cell in a severe environment. The WVP has five in-cell polar cranes which are of modular construction to aid replacement of failed components. Each can be withdrawn into a shielded cell extension for decontamination and hands-on maintenance. The cells have a total of 80 through wall tube positions to receive Master Slave Manipulators (MSMs). The MSMs are used where possible for ''pick and place'' purposes but are often called upon to position substantial pieces of mechanical equipment and thus are subject to heavy loading and high failure rates. An inward flow of air is maintained in the active cells. The discharged air passes through a filter cell where remote damper operation filter changing and maintenance is carried out by means of a PAR3000 manipulator. A Nuclear Engineered Advanced Teleoperated Robot (Neater) swabs the vitrified product container to ensure cleanliness before storage. There is a significant arising of solid radioactive waste from replaced in-cell items which undergoes sorting and size reduction in a breakdown cell equipped with a large reciprocating saw and a hydraulic shear. Improvements to the remote handling facilities made in the light of operational experience are described. (UK)

  3. Versatile cable handling mechanisms for remote operator control

    Energy Technology Data Exchange (ETDEWEB)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D. [Portech Ltd., Portsmouth (United Kingdom)

    1996-12-31

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (Author).

  4. Versatile cable handling mechanisms for remote operator control

    International Nuclear Information System (INIS)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D.

    1996-01-01

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (Author)

  5. Versatile cable handling mechanisms for remote operator control

    International Nuclear Information System (INIS)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D.

    1996-01-01

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other, between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (UK)

  6. Closure report for CAU 339: Area 12 Fleet Operations steam-cleaning discharge area, Nevada Test Site

    International Nuclear Information System (INIS)

    1997-12-01

    This Closure Report (CR) provides documentation of the completed corrective action at the Area 12 Fleet Operations site located in the southeast portion of the Area 12 Camp at the Nevada Test Site (NTS). Field work was performed in July 1997 as outlined in the Corrective Action Plan (CAP). The CAP was approved by the Nevada Division of Environmental Protection (NDEP) in June 1997. This site is identified in the Federal Facility Agreement and Consent Order (FFACO) as Corrective Action Site (CAS) Number 12-19-01 and is the only CAS in Corrective Action Unit (CAU) 339. The former Area 12 Fleet Operations Building 12-16 functioned as a maintenance facility for light- and heavy-duty vehicles from approximately 1965 to January 1993. Services performed at the site included steam-cleaning, tire service, and preventative maintenance on vehicles and equipment. Past activities impacted the former steam-cleaning discharge area with volatile organic compounds (VOCs) and total petroleum hydrocarbons (TPH) as oil

  7. A Benefit Analysis of Infusing Wireless into Aircraft and Fleet Operations - Report to Seedling Project Efficient Reconfigurable Cockpit Design and Fleet Operations Using Software Intensive, Network Enabled, Wireless Architecture (ECON)

    Science.gov (United States)

    Alexandrov, Natalia; Holmes, Bruce J.; Hahn, Andrew S.

    2016-01-01

    We report on an examination of potential benefits of infusing wireless technologies into various areas of aircraft and airspace operations. The analysis is done in support of a NASA seedling project Efficient Reconfigurable Cockpit Design and Fleet Operations Using Software Intensive, Network Enabled Wireless Architecture (ECON). The study has two objectives. First, we investigate one of the main benefit hypotheses of the ECON proposal: that the replacement of wired technologies with wireless would lead to significant weight reductions on an aircraft, among other benefits. Second, we advance a list of wireless technology applications and discuss their system benefits. With regard to the primary hypothesis, we conclude that the promise of weight reduction is premature. Specificity of the system domain and aircraft, criticality of components, reliability of wireless technologies, the weight of replacement or augmentation equipment, and the cost of infusion must all be taken into account among other considerations, to produce a reliable estimate of weight savings or increase.

  8. Design and operation of a remotely operated plutonium waste size reduction and material handling process

    International Nuclear Information System (INIS)

    Stewart, J.A. III; Charlesworth, D.L.

    1986-01-01

    Noncombustible 238 Pu and 239 Pu waste is generated as a result of normal operation and decommissioning activity at the Savannah River Plant, and is being retrievably stored there. As part of the long-term plant to process the stored waste and current waste for permanent disposal, a remote size reduction and material handling process is being cold-tested at Savannah River Laboratory. The process consists of a large, low-speed shredder and material handling system, a remote worktable, a bagless transfer system, and a robotically controlled manipulator. Initial testing of the shredder and material handling system and a cycle test of the bagless transfer system has been completed. Fabrication and acceptance testing of the Telerobat, a robotically controlled manipulator has been completed. Testing is scheduled to begin in 3/86. Design features maximizing the ability to remotely maintain the equipment were incorporated. Complete cold-testing of the equipment is scheduled to be completed in 1987

  9. Handling and transfer operations for partially-spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Ibrahim, J K [PUSPATI, Kuala Lumpur (Malaysia)

    1983-12-01

    This project involved the handling and transfer of partially-spent reactor fuel from the Oregon State University TRIGA Reactor in Corvallis, Oregon to Hanford Engineering Development Laboratory in Richland, Washington. The method of handling is dependent upon the burn-up history of the fuel elements. Legal constraints imposed by standing U.S. nuclear regulations determine the selection of transport containers, transportation procedures, physical security arrangements in transit and nuclear material accountability documentation. Results of in-house safety evaluations of the project determine the extent of involvement of pertinent nuclear regulatory authorities. The actual handling activities and actual radiation dose rates are also presented.

  10. Handling and transfer operations for partially-spent nuclear fuel

    International Nuclear Information System (INIS)

    Ibrahim, J.K.

    1983-01-01

    This project involved the handling and transfer of partially-spent reactor fuel from the Oregon State University TRIGA Reactor in Corvallis, Oregon to Hanford Engineering Development Laboratory in Richland, Washington. The method of handling is dependent upon the burn-up history of the fuel elements. Legal constraints imposed by standing U.S. nuclear regulations determine the selection of transport containers, transportation procedures, physical security arrangements in transit and nuclear material accountability documentation. Results of in-house safety evaluations of the project determine the extent of involvement of pertinent nuclear regulatory authorities. The actual handling activities and actual radiation dose rates are also presented (author)

  11. Hybrid CNG propulsion for fleet vehicles: emission reduction potential and operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Drozdz, P. [BC Research Institute, BC (Canada)

    1997-12-31

    A project (1) to build an experimental hybrid electric vehicle to be used as a test bed for the development of EZEV-oriented technologies, (2) to develop a control system to manage the energy use in a series hybrid vehicle, (3) to evaluate the suitability of valve regulated lead acid batteries for hybrid propulsion, and (4) to investigate the feasibility of using hybrid propulsion for medium duty fleet vehicles was discussed. In this context, the electric G-Van, the BCRI hybrid G-Van battery, the hybrid power unit, and the electronic control unit were described. The concept of hybrid vehicle control, and the control system software were explained, and a summary of the hybrid system efficiency test was provided.

  12. Remote operational trials with the ITER FDR divertor handling equipment

    International Nuclear Information System (INIS)

    Irving, M.; Baldi, L.; Benamati, G.; Galbiati, L.; Giacomelli, S.; Lorenzelli, L.; Micciche, G.; Muro, L.; Polverari, A.; Palmer, J.; Martin, E.

    2003-01-01

    The ITER divertor test platform (DTP) located at ENEA's Research Centre in Brasimone, Italy is a full-scale mock-up of a 72 deg. arc of the ITER 1998 vessel divertor region--the result of a major initiative over the period 1996-2000. Since the implementation of this facility, the design of the ITER vessel--and therefore much of the remote maintenance equipment--has changed substantially. However, the nature and principles of the remote handling equipment are still very similar, and hence many valuable lessons can yet be learned from the existing equipment for the future. In particular, true remote handling tests of the major maintenance subsystems were seen as an important step in determining their suitability for ITER. This paper describes and documents a series of three, discrete, remote-handling trials carried out using most of the major DTP subsystems, and presents an overview of the conclusions and suggestions for future development of ITER cassette remote handling equipment

  13. Corrective action plan for CAU Number 339: Area 12 Fleet Operations, Steam Cleaning Discharge Area, Nevada Test Site

    International Nuclear Information System (INIS)

    1997-05-01

    The purpose of this Corrective Action Plan (CAP) is to provide the method for implementing the corrective action alternative as provided in the Corrective Action Decision Document (CADD). Detailed information of the site history and results of previous characterizations can be found in the Work Plan, the Preliminary Investigation Report, and the Phase 2 Characterization Report. Previous characterization investigations were completed as a condition of the Temporary Water Pollution Control Permit issued by the Nevada Division of Environmental Protection (NDEP) on July 14, 1992. The scope of this report is to prepare a CAP based upon the selected remedial alternative for closure of the Area 12, Building 12-16 Fleet Operations steam cleaning discharge area. The effluent discharge area has been impacted by volatile organic compounds (VOCs) and total petroleum hydrocarbons (TPH) as oil. The maximum hydrocarbon and VOC concentrations detected in the Preliminary and Phase 2 Site Characterization Investigations are summarized

  14. The Radioactive Legacy of the Russian Pacific Fleet Operations and its Potential Impact on Neighboring Countries. Final Report

    International Nuclear Information System (INIS)

    Compton, K. L.; Novikov, V.M.; Parker, F.L.; Sivintsev, Y.U.

    2003-01-01

    There have been extensive studies of the current and potential environmental impact of Russian Northern fleet activities. However, despite the fact that the total number of ships in both fleets are comparable, there have been very few studies published in the open literature of the impact of the Pacific fleet. This study of the Pacific fleet's impact on neighboring countries was undertaken to partially remedy this lack of analysis. This study is focused on an evaluation of the inventory of major sources of radioactive material associated with the decommissioning of nuclear submarines, and an evaluation of releases to the atmosphere and their long-range (>100km) transboundary transport

  15. Handling device with grips operated by a servo-motor

    International Nuclear Information System (INIS)

    Sgarbi, F.; Detriche, J.M.

    1990-01-01

    On grip jaws are set up a detection circuit which allows the rocking of the control system from a control system in position to a control system in clamping strain when an object is held, and then which allows to use them by turns in order to keep only their advantages. A larger light touch handling is obtained. The application of this grip is recommended to catch brittle objects (for handicapped persons by example) [fr

  16. Fusion reactor handling operations with cable-driven parallel robots

    Energy Technology Data Exchange (ETDEWEB)

    Izard, Jean-Baptiste, E-mail: jeanbaptiste.izard@tecnalia.com; Michelin, Micael; Baradat, Cédric

    2015-10-15

    Highlights: • CDPR allow 6DOF positioning of loads using cable as links without payload swag. • Conceptual design of a CDPR for carrying and positioning tokamak sectors is given. • A CDPR for threading stellarator coils (6D trajectory following) is provided. • Both designs are capable of fullfilling the required precision without tooling. - Abstract: Cable-driven parallel robots (CDPR) are in their concept cranes with inclined cables which allow control of all the degrees of freedom of its payload, and therefore stability of all the degrees of freedom, including rotations. The workspace of a CDPR is only limited by the length of the cables, and the payload capacity related to the mass of the whole robot is very important. Besides, the control being based on kinematic models, the behavior of a CDPR is really that of a robot capable of automated trajectories or remote handling. The present paper gives a presentation of two use case studies based on some of the assembly phases and remote handling actions as designed for the recent fusion machines. Based on the use cases already in place in fusion reactor baselines, the opportunity of using CDPR for assembly of structural elements and coils is discussed. Finally, prospects for remote handling equipment from the reactor in hot cells are envisioned based on current CDPR research.

  17. Taking an Alternative Route: A guide for fleet operators and individual owners using alternative fuels in cars and trucks

    International Nuclear Information System (INIS)

    LaRocque, T.

    2001-01-01

    Taking an Alternative Route is a 30-page guide for fleet managers and individual owners on using alternative fuels in cars and trucks. Discussed in detail are all fuels authorized for federal credits under the Energy Policy Act of 1992 (EPAct). The publication informs federal and state fleet managers about how to comply with EPAct, and provides information about the Clean Air Act Amendments

  18. FLEET ASSIGNMENT MODELLING

    Directory of Open Access Journals (Sweden)

    2016-01-01

    Full Text Available The article is devoted to the airline scheduling process and methods of its modeling. This article describes the main stages of airline scheduling process (scheduling, fleet assignment, revenue management, operations, their features and interactions. The main part of scheduling process is fleet assignment. The optimal solution of the fleet assignment problem enables airlines to increase their incomes up to 3 % due to quality improving of connections and execution of the planned number of flights operated by less number of aircraft than usual or planned earlier. Fleet assignment of scheduling process is examined and Conventional Leg-Based Fleet Assignment Model is analyzed. Finally strong and weak aspects of the model (SWOT are released and applied. The article gives a critical analysis of FAM model, with the purpose of identi- fying possible options and constraints of its use (for example, in cases of short-term and long-term planning, changing the schedule or replacing the aircraft, as well as possible ways to improve the model.

  19. National safeguards system operations at a bulk-handling facility

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    The presentation centers on the State System of Accounting and Control (SSAC) for bulk-handling facilities in the licenses sector of the US nuclear community. Details of those material control and accounting measures dealing with the national safeguards program are discussed in Session 6a. The concept and role of the Fundamental Nuclear Material Control (FNMC) Plan are discussed with the participants. In Session 6b, the lecture focusses on the international safeguards program of the US SSAC. The relationship of the national and international requirements is discussed as they relate to the IAEA INFCIRC/153 document. The purpose of this session is to enable participants to: (1) understand the basic MC and A elements in an SSAC; (2) understand which MC and A elements serve the country's national interests and those that serve IAEA safeguards

  20. Spacelab operations planning. [ground handling, launch, flight and experiments

    Science.gov (United States)

    Lee, T. J.

    1976-01-01

    The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

  1. Time to retire : Indicators for aircraft fleets

    NARCIS (Netherlands)

    Newcamp, Jeffrey; Verhagen, W.J.C.; Curran, R.

    2017-01-01

    It is well known that aircraft fleets are aging alongside rising operations and support costs. Logisticians and fleet managers who better understand the milestones and timeline of an aging fleet can recognise potential savings. This paper outlines generalised milestones germane to military aircraft

  2. Minimizing the health and climate impacts of emissions from heavy-duty public transportation bus fleets through operational optimization.

    Science.gov (United States)

    Gouge, Brian; Dowlatabadi, Hadi; Ries, Francis J

    2013-04-16

    In contrast to capital control strategies (i.e., investments in new technology), the potential of operational control strategies (e.g., vehicle scheduling optimization) to reduce the health and climate impacts of the emissions from public transportation bus fleets has not been widely considered. This case study demonstrates that heterogeneity in the emission levels of different bus technologies and the exposure potential of bus routes can be exploited though optimization (e.g., how vehicles are assigned to routes) to minimize these impacts as well as operating costs. The magnitude of the benefits of the optimization depend on the specific transit system and region. Health impacts were found to be particularly sensitive to different vehicle assignments and ranged from worst to best case assignment by more than a factor of 2, suggesting there is significant potential to reduce health impacts. Trade-offs between climate, health, and cost objectives were also found. Transit agencies that do not consider these objectives in an integrated framework and, for example, optimize for costs and/or climate impacts alone, risk inadvertently increasing health impacts by as much as 49%. Cost-benefit analysis was used to evaluate trade-offs between objectives, but large uncertainties make identifying an optimal solution challenging.

  3. Distributed multi-level supervision to effectively monitor the operations of a fleet of autonomous vehicles in agricultural tasks.

    Science.gov (United States)

    Conesa-Muñoz, Jesús; Gonzalez-de-Soto, Mariano; Gonzalez-de-Santos, Pablo; Ribeiro, Angela

    2015-03-05

    This paper describes a supervisor system for monitoring the operation of automated agricultural vehicles. The system analyses all of the information provided by the sensors and subsystems on the vehicles in real time and notifies the user when a failure or potentially dangerous situation is detected. In some situations, it is even able to execute a neutralising protocol to remedy the failure. The system is based on a distributed and multi-level architecture that divides the supervision into different subsystems, allowing for better management of the detection and repair of failures. The proposed supervision system was developed to perform well in several scenarios, such as spraying canopy treatments against insects and diseases and selective weed treatments, by either spraying herbicide or burning pests with a mechanical-thermal actuator. Results are presented for selective weed treatment by the spraying of herbicide. The system successfully supervised the task; it detected failures such as service disruptions, incorrect working speeds, incorrect implement states, and potential collisions. Moreover, the system was able to prevent collisions between vehicles by taking action to avoid intersecting trajectories. The results show that the proposed system is a highly useful tool for managing fleets of autonomous vehicles. In particular, it can be used to manage agricultural vehicles during treatment operations.

  4. Distributed Multi-Level Supervision to Effectively Monitor the Operations of a Fleet of Autonomous Vehicles in Agricultural Tasks

    Directory of Open Access Journals (Sweden)

    Jesús Conesa-Muñoz

    2015-03-01

    Full Text Available This paper describes a supervisor system for monitoring the operation of automated agricultural vehicles. The system analyses all of the information provided by the sensors and subsystems on the vehicles in real time and notifies the user when a failure or potentially dangerous situation is detected. In some situations, it is even able to execute a neutralising protocol to remedy the failure. The system is based on a distributed and multi-level architecture that divides the supervision into different subsystems, allowing for better management of the detection and repair of failures. The proposed supervision system was developed to perform well in several scenarios, such as spraying canopy treatments against insects and diseases and selective weed treatments, by either spraying herbicide or burning pests with a mechanical-thermal actuator. Results are presented for selective weed treatment by the spraying of herbicide. The system successfully supervised the task; it detected failures such as service disruptions, incorrect working speeds, incorrect implement states, and potential collisions. Moreover, the system was able to prevent collisions between vehicles by taking action to avoid intersecting trajectories. The results show that the proposed system is a highly useful tool for managing fleets of autonomous vehicles. In particular, it can be used to manage agricultural vehicles during treatment operations.

  5. Reactor helium system, design specification, operation and handling

    International Nuclear Information System (INIS)

    Badrljica, R.

    1984-06-01

    Apart from detailed design specification of the helium cover gas system of the Ra reactor, this document includes description of the operating regime, instructions for manipulations in the system with the aim of achieving and maintaining stationary gas circulation [sr

  6. Development of monitoring-control methods for heavy remote handling operations in an irradiated environment

    Energy Technology Data Exchange (ETDEWEB)

    Argouac' h, J R [Alsthom-Atlantique, ACB Nantes (France)

    1984-11-01

    Heavy remote handling equipment units have benefited from the progress made in robotics, but with certain specific constraints linked to the environment in which they are required to operate. Notably, these constraints impose the exclusive use of electrical techniques.

  7. Operation and handling of a mobile robot with tricycle structure

    International Nuclear Information System (INIS)

    Segovia de los Rios, J.A.

    2003-01-01

    In this article the main cares that are for the appropriate operation of a designed mobile robot and built for the transport of radioactive materials are reported. In a same way, it is shown that the maneuverability of the vehicle is adapted for its tele operation in the atmospheres for where the irradiated charge should be made circulate, using for it the controls that have been designated of a remote control of general use. (Author)

  8. Fleet Numerical Meteorology and Oceanography Center (FNMOC) Navy Operational Global Atmospheric Prediction System (NOGAPS)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Navy Operational Global Atmospheric Prediction System (NOGAPS) provides numerical guidance and products in support of a wide range of Navy oceanographic and...

  9. Conceptual design report for a remotely operated cask handling system. Revision 1

    International Nuclear Information System (INIS)

    Yount, J.A.; Berger, J.D.

    1984-09-01

    Recent advances in remote handling utilizing commercial robotics are conceptually applied to lowering operator cumulative radiation exposure and increasing throughput during cask handling operations in nuclear shipping and receiving facilities. Revision 1 incorporates functional criteria for facility equipment, equipment technical outline specifications, and interface control drawings to assist Architect Engineers in the application of remote handling to waste shipping and receiving facilities. The document has also been updated to show some of the equipment used in proof-of-principle testing during fiscal year 1984. 10 references, 50 figures, 1 table

  10. Performance Evaluation and Suggestion of Upgraded Fuel Handling Equipment for Operating OPR1000

    International Nuclear Information System (INIS)

    Chang, Sang Gyoon; Hwang, Jeung Ki; Choi, Taek Sang; Na, Eun Seok; Lee, Myung Lyul; Baek, Seung Jin; Kim, Man Su; Kunik, Jack

    2011-01-01

    The purpose of this study is to evaluate the performance of upgraded FHE (Fuel Handling Equipment) for operating OPR 1000 (Optimized Power Reactor) by using data measured during the fuel reloading, and make some suggestions on enhancing the performance of the FHE. The fuel handling equipment, which serves critical processes in the refueling outage, has been upgraded to increase and improve the operational availability of the plant. The evaluation and suggestion of this study can be a beneficial tool related to the performance of the fuel handling equipment

  11. EDF steam generators fleet: In-operation monitoring of TSP blockage and tube fouling

    Energy Technology Data Exchange (ETDEWEB)

    Bertrand, P.; Gay, N.; Crinon, R. [Electricite De France (France)

    2012-07-01

    EDF operates 58 Pressurized Water Reactors in France. In the mid 2000‟s some of them have been affected by Steam Generators (SG) Tube Support Plates (TSP) blockage and U-tubes external surface fouling with iron oxides deposits due to corrosion of secondary-side components. These issues have been tackled by a global maintenance strategy of chemical cleanings and a method for in-operation monitoring of fouling and TSP blockage has been developed and is implemented since mid 2009. This monitoring is aimed at giving information for SG maintenance planning as regards non destructive examinations and chemical cleaning. This paper will first remind of the physical reasons of fouling and TSP blockage and identify the resulting stakes regarding safety and availability along with the action levers available to control both phenomena. Then details will be given on how in-operation monitoring of fouling and TSP blockage is carried out, using measurements of Wide Range water Level (WRL) and SG steam pressure during thermally stabilized periods. Information will also be given on how those data are analyzed and shared as well at a local as at a corporate level to participate in the planning of SG inspection and maintenance operations. Finally, possible refinements will be discussed, notably regarding the issue of WRL measurements reliability and the possibility to use the analysis of SG dynamic behavior during power transients to assess the TSP blockage ratio. In terms of „issues requiring discussion‟, the following are operational issues currently being investigated by EDF: 1. SG pressure can have quite large variations during one operating cycle (notably after a plant trip) and from one cycle to the other and generally pressure tends to decrease on a long-term basis. How can such variations be explained? What are the solutions to moderate/stop the pressure loss? 2. On some of the SG-models operated by EDF, hard curative Chemical Cleaning of the U-tubes didn't bring

  12. Operating experiences in fuel handling system at KGS

    International Nuclear Information System (INIS)

    Reddy, G.P.; Nagabhushanam

    2006-01-01

    Refuelling operations were started at KGS in August, 2000. Rich and varied experience was gained during this period through internal discussion/Quality circles/Procedural reviews and analysis of various incidents that have taken place in KGS and other units of NPCIL Some of the unique jobs carried out at KGS include-Development of tools for in-situ replacement of FM front end cover in FM service area (which was done for the first time in NPCIL history), Modification of FM magazine rear end plate mounting screws to avoid the possibility of magazine rotation stalling, The incident of Stalling of B-Ram during installation of upstream shield plug in KGS - 1 has brought out many weakness that were existing in the system in a dormant manner. Review of maintenance procedures was carried out and a special underwater operated sensor was developed and installed in Transfer Magazine to sense the presence and proper positioning of fuel bundles in the Transfer magazine tube during fuel loading operation. Numerous modifications were carried out in the system to increase equipment reliability, ease of operation and maintenance, to reduce man-rem consumption. Most notable among these modifications include -zig saw panel modification, EFCV O-ring modification, Ram BF switch modification, provision for increase in SFSB level provision, snout clamp oil circuit modification, ball valve actuator modification, installation of additional switch for sensing STS carriage UP position etc, This paper focuses on the challenges tackled in achieving near perfect performance, innovations and improvements carried out in the system to strive for this goal and development of procedures for reducing man-rem consumption and life extension of critical components. (author)

  13. Fleet size estimation for spreading operation considering road geometry, weather and traffic

    Directory of Open Access Journals (Sweden)

    Steven I-Jy Chien

    2014-02-01

    Full Text Available Extreme weather conditions(i.e. snow storm in winter time have caused significant travel disruptions and increased delay and traffic accidents. Snow plowing and salt spreading are the most common counter-measures for making our roads safer for motorists. To assist highway maintenance authorities with better planning and allocation of winter maintenance resources, this study introduces an analytical model to estimate the required number of trucks for spreading operation subjective to pre-specified service time constraints considering road geometry, weather and traffic. The complexity of the research problem lies in dealing with heterogeneous road geometry of road sections, truck capacities, spreading patterns, and traffic speeds under different weather conditions and time periods of an event. The proposed model is applied to two maintenance yards with seven road sections in New Jersey (USA, which demonstrates itself fairly practical to be implemented, considering diverse operational conditions.

  14. Best Operational and Maintenance Practices for City Bus Fleets to Maximize Fuel Economy

    OpenAIRE

    Energy Sector Management Assistance Program

    2011-01-01

    In most large cities in developing countries, buses continue to be the public transport option of choice, carrying a large share of urban travelers. However, transit bus companies in these countries are often cash-strapped. In many cases, the operating cost per bus kilometer exceeds revenues and bus fares are often kept low irrespective of the cost of providing service. Many cities are dom...

  15. Integration of Behind-the-Meter PV Fleet Forecasts into Utility Grid System Operations

    Energy Technology Data Exchange (ETDEWEB)

    Hoff, Thomas Hoff [Clean Power Research, L.L.C., Napa, CA (United States); Kankiewicz, Adam [Clean Power Research, L.L.C., Napa, CA (United States)

    2016-02-26

    Four major research objectives were completed over the course of this study. Three of the objectives were to evaluate three, new, state-of-the-art solar irradiance forecasting models. The fourth objective was to improve the California Independent System Operator’s (ISO) load forecasts by integrating behind-the-meter (BTM) PV forecasts. The three, new, state-of-the-art solar irradiance forecasting models included: the infrared (IR) satellite-based cloud motion vector (CMV) model; the WRF-SolarCA model and variants; and the Optimized Deep Machine Learning (ODML)-training model. The first two forecasting models targeted known weaknesses in current operational solar forecasts. They were benchmarked against existing operational numerical weather prediction (NWP) forecasts, visible satellite CMV forecasts, and measured PV plant power production. IR CMV, WRF-SolarCA, and ODML-training forecasting models all improved the forecast to a significant degree. Improvements varied depending on time of day, cloudiness index, and geographic location. The fourth objective was to demonstrate that the California ISO’s load forecasts could be improved by integrating BTM PV forecasts. This objective represented the project’s most exciting and applicable gains. Operational BTM forecasts consisting of 200,000+ individual rooftop PV forecasts were delivered into the California ISO’s real-time automated load forecasting (ALFS) environment. They were then evaluated side-by-side with operational load forecasts with no BTM-treatment. Overall, ALFS-BTM day-ahead (DA) forecasts performed better than baseline ALFS forecasts when compared to actual load data. Specifically, ALFS-BTM DA forecasts were observed to have the largest reduction of error during the afternoon on cloudy days. Shorter term 30 minute-ahead ALFS-BTM forecasts were shown to have less error under all sky conditions, especially during the morning time periods when traditional load forecasts often experience their largest

  16. U. S. Atlantic Fleet, Eighth Amphibious Force. Operation Plan Number 2-44

    Science.gov (United States)

    1944-01-01

    distributed with this Operation Order. (c) Panoramic Bench Sketches No. P-l for Boach 259 and No. P~3 for Loach 26l (South) givo viator level...To indicate tank or ID targets. (g) Green Cluster, White Cluster - Lift Artillery fire. Page 32 of 33. ANNEX KENS . GTMFIRS SUPPORT PLAN. TABLE VI...AURORA . SFCP 5 AUX GROUND SPOT - LIVERMORS SFCP 6 AUX GROUND SPOT - LA GLOIRE SFCP 7 AUX GROUND -SPOT ~ TERM- ERIC SFCP 8 AUX GROUND SPOT - ORION-KEAR

  17. Operators' arrangement for handling nuclear accidents at power plants

    International Nuclear Information System (INIS)

    Bertron, L.; Meclot, B.

    1986-01-01

    Given the preventive measures adopted by Electricite de France (EDF), the probability of a nuclear accident occurring in a power plant is extremely low but cannot, even so, be considered to be zero. The operator must therefore be prepared for this possibility. Apart from dealing with the consequences of the accident, the organization he sets up must fulfil the double objective of preventing any worsening of the accident and ensuring that the social, political and economic effects remain in proportion to the seriousness of the accident. The paper describes the organization set up by EDF in co-operation with the public authorities, indicating the concepts on which it is based and the logistical resources brought into play, in particular for telecommunications. Reports on the TMI incident showed that public telecommunications services can well be saturated in the event of an emergency. EDF, relying on the combined advantages of all transmission systems which the French Postal and Telecommunications Office can place at its disposal, as well as private networks with a concession from the Government, has taken the necessary precautions to deal with this problem. The organization is also designed to respond to the requirements of the media and the population at large for correct information. These systems are naturally all tested during training exercises which ensure that the organization as a whole can cope, in terms both of manpower and equipment, with a very improbable event. (author)

  18. National Clean Fleets Partnership (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2012-01-01

    Provides an overview of Clean Cities National Clean Fleets Partnership (NCFP). The NCFP is open to large private-sector companies that have fleet operations in multiple states. Companies that join the partnership receive customized assistance to reduce petroleum use through increased efficiency and use of alternative fuels. This initiative provides fleets with specialized resources, expertise, and support to successfully incorporate alternative fuels and fuel-saving measures into their operations. The National Clean Fleets Partnership builds on the established success of DOE's Clean Cities program, which reduces petroleum consumption at the community level through a nationwide network of coalitions that work with local stakeholders. Developed with input from fleet managers, industry representatives, and Clean Cities coordinators, the National Clean Fleets Partnership goes one step further by working with large private-sector fleets.

  19. Operation of data acquisition and handling system in the INS-SF cyclotron

    International Nuclear Information System (INIS)

    Yasue, M.; Omata, K.

    1976-01-01

    Operations of following data processing routines are described. 1) One-dimensional multiplexer PHA. 2) Two-dimensional multiplexer PHA. 3) Two or three parameter data handling: Digital gating, dumping of raw data onto MT and processing in function modes. These processing routines are executed under the control of a real time disk operating system in TOSBAC-40C. (auth.)

  20. Corrective Action Decision Document (CADD), Area 12 fleet operations steam cleaning discharge area, Nevada Test Site Corrective Action Unit 339

    Energy Technology Data Exchange (ETDEWEB)

    Bonn, J.F.

    1996-12-01

    This Corrective Action Decision Document (CADD) incorporates the methodology used for evaluating the remedial alternatives completed for a former steam cleaning discharge area at the Nevada Test Site (NTS). The former steam cleaning site is located in Area 12, east of the Fleet Operations Building 12-16. The discharge area has been impacted by Resource Conservation and Recovery Act (RCRA) F Listed volatile organic compounds (VOCs) and petroleum hydrocarbons waste. Based upon these findings, resulting from Phase 1 and Phase 2 site investigations, corrective action is required at the site. To determine the appropriate corrective action to be proposed, an evaluation of remedial alternatives was completed. The evaluation was completed using a Corrective Measures Study (CMS). Based on the results of the CMS, the favored closure alternative for the site is plugging the effluent discharge line, removing the sandbagged barrier, completing excavation of VOC impacted soils, and fencing the soil area impacted by total petroleum hydrocarbons (TPH), east of the discharge line and west of the soil berm. Management of the F Listed VOCs are dictated by RCRA. Due to the small volume of impacted soil, excavation and transportation to a Treatment Storage and Disposal Facility (TSDF) is the most practical method of management. It is anticipated that the TPH (as oil) impacted soils will remain in place based upon; the A through K Analysis, concentrations detected (maximum 8,600 milligrams per kilogram), expected natural degradation of the hydrocarbons over time, and the findings of the Phase 2 Investigation that vertical migration has been minimal.

  1. Corrective Action Decision Document (CADD), Area 12 fleet operations steam cleaning discharge area, Nevada Test Site Corrective Action Unit 339

    International Nuclear Information System (INIS)

    Bonn, J.F.

    1996-12-01

    This Corrective Action Decision Document (CADD) incorporates the methodology used for evaluating the remedial alternatives completed for a former steam cleaning discharge area at the Nevada Test Site (NTS). The former steam cleaning site is located in Area 12, east of the Fleet Operations Building 12-16. The discharge area has been impacted by Resource Conservation and Recovery Act (RCRA) F Listed volatile organic compounds (VOCs) and petroleum hydrocarbons waste. Based upon these findings, resulting from Phase 1 and Phase 2 site investigations, corrective action is required at the site. To determine the appropriate corrective action to be proposed, an evaluation of remedial alternatives was completed. The evaluation was completed using a Corrective Measures Study (CMS). Based on the results of the CMS, the favored closure alternative for the site is plugging the effluent discharge line, removing the sandbagged barrier, completing excavation of VOC impacted soils, and fencing the soil area impacted by total petroleum hydrocarbons (TPH), east of the discharge line and west of the soil berm. Management of the F Listed VOCs are dictated by RCRA. Due to the small volume of impacted soil, excavation and transportation to a Treatment Storage and Disposal Facility (TSDF) is the most practical method of management. It is anticipated that the TPH (as oil) impacted soils will remain in place based upon; the A through K Analysis, concentrations detected (maximum 8,600 milligrams per kilogram), expected natural degradation of the hydrocarbons over time, and the findings of the Phase 2 Investigation that vertical migration has been minimal

  2. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory

    International Nuclear Information System (INIS)

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL's existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required

  3. Analysis of operational possibilities and conditions of remote handling systems in nuclear facilities

    International Nuclear Information System (INIS)

    Hourfar, D.

    1989-01-01

    Accepting the development of the occupational radiation exposure in nuclear facilities, it will be showing possibilities of cost effective reduction of the dose rate through the application of robots and manipulators for the maintenance of nuclear power plants, fuel reprocessing plants, decommissioning and dismantling of the mentioned plants. Based on the experiences about industrial robot applications by manufacturing and manipulator applications by the handling of radioactive materials as well as analysis of the handling procedures and estimation of the dose intensity, it will be defining task-orientated requirements for the conceptual design of the remote handling systems. Furthermore the manifold applications of stationary and mobil arranged handling systems in temporary or permanent operation are described. (orig.) [de

  4. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

  5. The use of virtual reality for preparation and implementation of JET remote handling operations

    International Nuclear Information System (INIS)

    Sanders, S.; Rolfe, A.C.

    2003-01-01

    The use of real time 3-D computer graphic models for preparation and support of remote handling operations on JET has been in use since the mid 1980s. A complete review has been undertaken of the functional requirements and benefits of VR for remote handling and a subsequent market survey of the present state-of-the-art of VR systems has resulted in the implementation of a new system for JET. The VR system is used in two discrete modes: in on-line mode the remote handling equipment Electro-mechanical hardware is connected to the VR system and provides input for the VR system to update a real time 3-D display of the equipment inside the torus. This mode supplements the video camera system and assists with camera control and warnings of impending or potential collisions. In Off-line mode the operator manipulates the VR system model with no connections to the remote handling equipment. This mode is used during preparation of RH operational strategies, checking of operational feasibility and operations procedures. Various VR systems were evaluated against a detailed technical specification that covered visualisation function and performance, user interface design and base model input/creation capabilities. The cheapest of those systems that satisfied the technical requirements was selected

  6. Experience of remote under water handling operations at Tarapur Atomic Power Station

    International Nuclear Information System (INIS)

    Agarwal, S.K.

    1990-01-01

    Each Refuelling outage of Tarapur Atomic Power Station Reactors involves a great deal of remote underwater handling operations using special remote handling tools, working deep down in the reactor vessel under about sixty feet of water and in the narrow confines of highly radioactive core. The remote underwater handling operations include incore and out of core sipping operations, fuel reloading or shuffling, uncoupling of control rod drives, replacement and shuffling of control blades, replacement of local power range monitors, spent fuel shipment in casks, retrieval of fallen or displaced fuel top guide spacers, orifices and their installation, underwater CCTV inspection of reactor internals, core verification, channelling and dechannelling of fuel bundles, inspection of fuel bundles and channels, unbolting and removal of old racks, installation of high density racks, removal and reinstallation of fuel support plugs and guide tubes, underwater cutting of irradiated hardware material and their disposal, fuel reconstitution, removal and reinstallation of system dryer separator etc.. The paper describes in brief the salient experience of remote underwater handling operations at TAPS especially the unusual problems faced and solved, by using special tools, employing specific techniques and by repeated efforts, patience, ingenuity and skills. (author). 10 figs

  7. 41 CFR 102-34.330 - What is the Federal Fleet Report?

    Science.gov (United States)

    2010-07-01

    ... Fleet Report? 102-34.330 Section 102-34.330 Public Contracts and Property Management Federal Property... MANAGEMENT Federal Fleet Report § 102-34.330 What is the Federal Fleet Report? The Federal Fleet Report (FFR..., in evaluating the effectiveness of the operation and management of individual fleets to determine...

  8. Operative experience in handling enriched uranium compounds in an U3O8 production plant

    International Nuclear Information System (INIS)

    Friedenthal, M.; Cardenas Yucra, H.R.; Cinat, E.; Pino, H.F.; Surin, C.

    1987-01-01

    The design of a nuclear installation associated with chemical processes depends fundamentally on the risks derived from the materials and process used. The operative experience brings useful data mainly related to the ventilation and equipment design that allow to improve the handling of operational incidents and maintenance work. The paper presents the results extracted from a production campaign; ambient and personal monitoring results from monitorings performed routinely and during special interventions are commented. (Author)

  9. Demonstration of remotely operated TRU waste size reduction and material handling equipment

    International Nuclear Information System (INIS)

    Looper, M.G.; Charlesworth, D.L.

    1988-01-01

    The Savannah River Laboratory (SRL) is developing remote size reduction and material handling equipment to prepare 238 Pu contaminated waste for permanent disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. The waste is generated at the Savannah River Plant (SRP) from normal operation and decommissioning activity and is retrievably stored onsite. A Transuranic Waste Facility for preparing, size-reducing, and packaging this waste for disposal is scheduled for completion in 1995. A cold test facility for demonstrating the size reduction and material handling equipment was built, and testing began in January 1987. 9 figs., 1 tab

  10. Manipulator and materials handling systems for reactor decommissioning -Cooperation between the university and the plant operator

    International Nuclear Information System (INIS)

    Schreck, G.; Bach, F. W.; Haferkamp, H.

    1995-01-01

    Nuclear reactor dismantling requires suitable handling systems for tools and disassembled components, as well as qualified and reliable disassembly and cutting techniques. From the angle of radiation protection, remote-controlled handling techniques and underwater techniques are the methods of choice, the latter particularly in continuation of plant operating conditions, and this all the more the more disassembly work proceeds towards the reactor core. With the experience accumulated for 20 years now by the Institut fuer Werkstoffkunde (materials science) of Hannover University by basic research and application-oriented development work in the field of thermal cutting technology, especially plasma arc cutting techniques, as well as development work in the field of remote-controlled materials handling systems, the institute is the cut-out partner for disassembly tasks in reactor decommissioning. (Orig./DG) [de

  11. State and outlooks of remote handling and automation techniques use for industrial radioactive operations

    International Nuclear Information System (INIS)

    Guilloteau, R.; Le Guennec, R.; Dumond, S.

    1981-01-01

    Handling in reactors mainly concerns charging and discharging operations and inspection. Specific means are being developed for each operation, with an increasing degree of automation. This serves to reduce exposure of personnel. However, the development of these means conflicts in certain cases with the original plant design, which did not provide for remote maintenance. With regard to fuel reprocessing, handling at the processing level is becoming increasingly automated. The difficulties lie principally in maintenance and waste conditioning operations. These involve less specialized means than is the case with reactors and can only be automated to a limited extent, save in exceptional cases. The greatest progress will be achieved by laying down stringent maintenance principles and taking them into consideration at the design stage

  12. Fleet equipment performance measurement preventive maintenance model : final report.

    Science.gov (United States)

    2014-04-01

    The concept of preventive maintenance is very important in the effective management and deployment of : vehicle fleets. The Texas Department of Transportation (TxDOT) operates a large fleet of on-road and offroad : equipment. Newer engines and vehicl...

  13. Experience with fuel damage caused by abnormal conditions in handling and transporting operations

    International Nuclear Information System (INIS)

    Bailey, W.J.

    1983-01-01

    Pacific Northwest Laboratory (PNL) conducted a study to determine the expected condition of spent USA light-water reactor (LWR) fuel upon arrival at interim storage or fuel reprocessing facilities or, if fuel is declared a waste, at disposal facilities. Initial findings were described in an earlier PNL paper at PATRAM '80 and in a report. Updated findings are described in this paper, which includes an evaluation of information obtained from the literature and a compilation of cases of known or suspected damage to fuel as a result of handling and/or transporting operations. To date, PNL has evaluated 123 actual cases (98 USA and 25 non-USA). Irradiated fuel was involved in all but 10 of the cases. From this study, it is calculated that the frequency of unusual occurrences involving fuel damage from handling and transporting operations has been low. The damage that did occur was generally minor. The current base of experience with fuel handling and transporting operations indicates that nearly all of these unusual occurrences had only a minor or negligible effect on spent fuel storage facility operations

  14. Improving fleet performance

    International Nuclear Information System (INIS)

    Ramjist, S.

    2015-01-01

    Use Fleet Initiatives to Improve Overall Fleet Performance . Tightly Integrated with Business Planning (Cause & Effect) . Leverage Strength of Broader Organization - Converge on Standard Business Practices . Ancillary Benefit of Improved Agility.

  15. Stalin's Big Fleet Program

    National Research Council Canada - National Science Library

    Mauner, Milan

    2002-01-01

    Although Dr. Milan Hauner's study 'Stalin's Big Fleet program' has focused primarily on the formation of Big Fleets during the Tsarist and Soviet periods of Russia's naval history, there are important lessons...

  16. Improving fleet performance

    Energy Technology Data Exchange (ETDEWEB)

    Ramjist, S. [Ontario Power Generation, Toronto, ON (Canada)

    2015-07-01

    Use Fleet Initiatives to Improve Overall Fleet Performance . Tightly Integrated with Business Planning (Cause & Effect) . Leverage Strength of Broader Organization - Converge on Standard Business Practices . Ancillary Benefit of Improved Agility.

  17. Demonstration of a remotely operated TRU waste size-reduction and material handling process

    International Nuclear Information System (INIS)

    Stewart, J.A. III; Schuler, T.F.; Ward, C.R.

    1986-01-01

    Noncombustible Pu-238 and Pu-239 waste is generated as a result of normal operation and decommissioning activity at the Savannah River Plant and is being retrievably stored at the site. As part of the long-term plan to process the stored waste and current waste for permanent disposal, a remote size-reduction and material handling process is being tested at Savannah River Laboratory to provide design support for the plant TRU Waste Facility scheduled to be completed in 1993. The process consists of a large, low-speed shredder and material handling system, a remote worktable, a bagless transfer system, and a robotically controlled manipulator, or Telerobot. Initial testing of the shredder and material handling system and a cycle test of the bagless transfer system were completed. Initial Telerobot run-in and system evaluation was completed. User software was evaluated and modified to support complete menu-driven operation. Telerobot prototype size-reduction tooling was designed and successfully tested. Complete nonradioactive testing of the equipment is scheduled to be completed in 1987

  18. FleetDASH

    Energy Technology Data Exchange (ETDEWEB)

    Singer, Mark R [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-06

    FleetDASH helps federal fleet managers maximize their use of alternative fuel. This presentation explains how the dashboard works and demonstrates the newest capabilities added to the tool. It also reviews complementary online tools available to fleet managers on the Alternative Fuel Data Center.

  19. Interim design status and operational report for semiremote handling fixtures: size reduction system

    International Nuclear Information System (INIS)

    Ballard, A.S.

    1977-02-01

    Crushing of HTGR fuel elements is accomplished by a three-stage crushing system consisting of two overhead eccentric jaw crushers, a double-roll crusher, and an oversize reduction system to ensure complete reduction to the desired size. The crushing system is mounted in a special framework which enables gravity flow, eliminates material transport, and minimizes material holdup. The system has been designated UNIFRAME because of the integrated nature of the equipment. This report addresses the demonstration of semiremote maintenance of the crusher in a nonradioactive environment. Although the crusher maintenance system has some remote handling capability inherent in its design, the scope of this initial program is limited to the handling of selected components and allows for manual assistance in certain circumstances. This mode of operation is designated semiremote maintenance and is intended as an effort to gather experience

  20. Nuclear fleet: Today and tomorrow

    International Nuclear Information System (INIS)

    Levin, B.M.; Kovalenko, V.K.; Sinyaev, A.K.

    1993-01-01

    Many years of operational experience have shown advantages of nuclear liner icebreakers over those burning fossil fuels primarily in ensuring reliable and stable shipping along the North Sea Route with an extended navigation season being realized. The advantages of the nuclear fleet are described

  1. Conceptual design of a test facility for the remote handling operations of the ITER Test Blanker Modules

    International Nuclear Information System (INIS)

    Marqueta, A.; Garcia, I.; Gomez, A.; Garcia, L.; Sedano, E.; Fernandez, I.

    2012-01-01

    Conceptual Design of a test facility for the remote handling operations of the ITER Test Blanket Modules. Conditions inside a fusion reactor are incompatible with conventional manual maintenance tasks. the same applies for ancillary equipment. As a consequence, it will become necessary to turn to remote visualization and remote handling techniques, which will have in consideration the extreme conditions, both physical and operating, of ITER. Main goal of the project has been the realization of the conceptual design for the test facility for the Test Blanket Modules of ITER and their associated systems, related to the Remote Handling operations regarding the Port Cell area. Besides the definition of the operations and the specification of the main components and ancillary systems of the TBM graphical simulation have been used for the design, verification and validation of the remote handling operations. (Author)

  2. The French wind energy market by 2020. Market evolution and competition context within the sector. Analysis of business model and of financial performance of fleet operators

    International Nuclear Information System (INIS)

    2016-01-01

    As the French wind energy sector has been recovering a good dynamics since 2014, notably for onshore production whereas some uncertainties remain present for offshore production, this report aims at assessing market perspectives by 2020, and at identifying business opportunities for the different involved actors. The first part identifies some determining factors for the sector activity, proposes an analysis of the activity for the 2002-2015 period (installed power, electricity production, turnover, equipment manufacturers, operators) and its perspectives by 2020 (evolution of determining factors, installed power, market share evolution for manufacturers, opportunities and threats on the medium term). The second part discusses the main elements of the operators' business models, and analyses fleet managers' financial data. Structural drivers and brakes are then discussed, as well as the French, European and World context (installed power, installed offshore power, electricity production, energy policy, law for energy transition, commitment of public authorities in favour of wind energy, competitiveness of wind energy). Some highlights and aspects of offer evolution are outlined: development of offshore wind energy, diversification of operators, international development, takeovers and capital increase, new financing modes. The last parts propose an analysis of the economic structure of the sector in France (types of interveners, staff, location, machine power evolution) and an overview of the main actors. Identity sheets of the main operators and equipment manufacturers are provided, as well as economic and financial data of 200 operators which can be compared through 5 key indicators

  3. An innovative concept for handling and operation of the wastewater treatment plant of Cottbus

    International Nuclear Information System (INIS)

    Spiller, K.; Schmitt, J.

    1994-01-01

    A new concept for handling and operating the wastewater treatment plant of Cottbus, with computerized modelling and an expert system as integral parts of process analysis and decision-making, is developed. Optimized plant operation and process stability is to be achieved by conrolling process-dependent dosage of wastewater coming from sludge treatment and from faecal wastewater. With the treatment plant still being built, a thorough analysis of the influent and the resulting process conditions is done, using the computerized model. Results and consequences for process optimization are presented in this article. Special attention has to be given to load smoothing and optimization of denitrification, influencing process stability and quality. Thereby not only the legal requirements can be fulfilled but improvement of effluent quality also could be achieved, reducing total nitrogen in the effluent by as much as 50%, lowering wastewater treatment costs by allowing lower control levels and fees to be payed. (orig.) [de

  4. [Handling modern imaging procedures in a high-tech operating room].

    Science.gov (United States)

    Hüfner, T; Citak, M; Imrecke, J; Krettek, C; Stübig, T

    2012-03-01

    Operating rooms are the central unit in the hospital network in trauma centers. In this area, high costs but also high revenues are generated. Modern operating theater concepts as an integrated model have been offered by different companies since the early 2000s. Our hypothesis is that integrative concepts for operating rooms, in addition to improved operating room ergonomics, have the potential for measurable time and cost savings. In our clinic, an integrated operating room concept (I-Suite, Stryker, Duisburg) was implemented after analysis of the problems. In addition to the ceiling-mounted arrangement, the system includes an endoscopy unit, a navigation system, and a voice control system. In the first 6 months (9/2005 to 2/2006), 112 procedures were performed in the integrated operating room: 34 total knee arthroplasties, 12 endoscopic spine surgeries, and 66 inpatient arthroscopic procedures (28 shoulder and 38 knee reconstructions). The analysis showed a daily saving of 22-45 min, corresponding to 15-30% of the daily changeover times, calculated to account for potential savings in the internal cost allocation of 225-450 EUR. A commercial operating room concept was evaluated in a pilot phase in terms of hard data, including time and cost factors. Besides the described effects further savings might be achieved through the effective use of voice control and the benefit of the sterile handle on the navigation camera, since waiting times for an additional nurse are minimized. The time of the procedure of intraoperative imaging is also reduced due to the ceiling-mounted concept, as the C-arm can be moved freely in the operating theater without hindering cables. By these measures and ensuing improved efficiency, the initial high costs for the implementation of the system may be cushioned over time.

  5. Fleet retrofit report

    Science.gov (United States)

    1973-01-01

    Flight tests are evaluated of an avionics system which aids the pilot in making two-segment approaches for noise abatement. The implications are discussed of equipping United's fleet of Boeing 727-200 aircraft with two-segment avionics for use down to Category 2 weather operating minima. The experience is reported of incorporating two-segment approach avionics systems on two different aircraft. The cost of installing dual two-segment approach systems is estimated to be $37,015 per aircraft, including parts, labor, and spares. This is based on the assumption that incremental out-of-service and training costs could be minimized by incorporating the system at airframe overhaul cycle and including training in regular recurrent training. Accelerating the modification schedule could add up to 50 percent to the modification costs. Recurring costs of maintenance of the installation are estimated to be of about the same magnitude as the potential recurrent financial benefits due to fuel savings.

  6. Application of Strategic Planning Process with Fleet Level Analysis Methods

    Science.gov (United States)

    Mavris, Dimitri N.; Pfaender, Holger; Jimenez, Hernando; Garcia, Elena; Feron, Eric; Bernardo, Jose

    2016-01-01

    The goal of this work is to quantify and characterize the potential system-wide reduction of fuel consumption and corresponding CO2 emissions, resulting from the introduction of N+2 aircraft technologies and concepts into the fleet. Although NASA goals for this timeframe are referenced against a large twin aisle aircraft we consider their application across all vehicle classes of the commercial aircraft fleet, from regional jets to very large aircraft. In this work the authors describe and discuss the formulation and implementation of the fleet assessment by addressing the main analytical components: forecasting, operations allocation, fleet retirement, fleet replacement, and environmental performance modeling.

  7. A dynamic simulation to study NET in-vessel handling operations

    International Nuclear Information System (INIS)

    Fung, P.T.F.

    1989-01-01

    The inspection, maintenance and repair of the Next European Torus (NET) fusion machine will require the extensive use of remote handling equipment to minimise the human exposure to the high radiation environment. The use of efficient manipulators will reduce the NET downtime by reducing the preparation time for entry into the controlled area and by performing the task with reasonable area and by performing the task with reasonable dexterity and speed, consistent with safety. A high fidelity simulation is a valuable tool to assist in the manipulator design, operations, trajectory planning, parameter optimisation and system verification. A manipulator simulation package called ASAD was originally developed by Spar for space manipulator applications. It is now being adapted to simulate the in-Vessel HandlingUnit for the NET program. This terestrial version of ASAD has been name ASAD - T. Spar, through the services of the Canadian Fusion Fuels Technology Project, is under contract to the NET program for the performance of this activity. This paper describes the capabillities and underlying assumptions of ASAD - T, aling with description of the simulation development of the NET in-vessel manipulator. (author). 4 refs.; 7 figs

  8. CleanFleet. Final report: Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    CleanFleet, formally known as the South Coast Alternative Fuels Demonstration, was a comprehensive demonstration of alternative fuel vehicles (AFVs) in daily commercial service. Between April 1992 and September 1994, five alternative fuels were tested in 84 panel vans: compressed natural gas (CNG), propane gas, methanol as M-85, California Phase 2 reformulated gasoline (RFG), and electricity. The AFVs were used in normal FedEx package delivery service in the Los Angeles basin alongside 27 {open_quotes}control{close_quotes} vans operating on regular gasoline. The liquid and gaseous fuel vans were model year 1992 vans from Ford, Chevrolet, and Dodge. The two electric vehicles (EVs) were on loan to FedEx from Southern California Edison. The AFVs represented a snapshot in time of 1992 technologies that (1) could be used reliably in daily FedEx operations and (2) were supported by the original equipment manufacturers (OEMs). A typical van is shown in Figure 2. The objective of the project was to demonstrate and document the operational, emissions, and economic status of alternative fuel, commercial fleet delivery vans in the early 1990s for meeting air quality regulations in the mid to late 1990s. During the two-year demonstration, CleanFleet`s 111 vehicles travelled more than three million miles and provided comprehensive data on three major topics: fleet operations, emissions, and fleet economics. Fleet operations were examined in detail to uncover and resolve problems with the use of the fuels and vehicles in daily delivery service. Exhaust and evaporative emissions were measured on a subset of vans as they accumulated mileage. The California Air Resources Board (ARB) measured emissions to document the environmental benefits of these AFVs. At the same time, CleanFleet experience was used to estimate the costs to a fleet operator using AFVs to achieve the environmental benefits of reduced emissions.

  9. Thermal and mechanical properties of aluminized fabrics for use in ferrous metal handling operations.

    Science.gov (United States)

    Wren, J E; Scott, W D; Bates, C E

    1977-11-01

    Protective garments are normally worn in molten handling operations to provide some protection against molten metal splashes. These garments are also intended to provide protection against radiant heat, and they should be as heat resistant and comfortable as possible. Asbestos-based fabrics have been employed for many years, but recently some concern has been expressed over possible asbestos exposure. This program was undertaken to explore the ability of several types of fabrics to resist heat transfer during molten metal impact. A molten metal splash test, along with standard methods for determining tensile strength, flame resistance, and abrasion-flexing resistance were used to evaluate several classes of protective fabrics. The results indicate that there are materials available that offer equal or better mechanical properties and thermal protection compared to aluminized asbestos.

  10. Operation room tool handling and miscommunication scenarios: an object-process methodology conceptual model.

    Science.gov (United States)

    Wachs, Juan P; Frenkel, Boaz; Dori, Dov

    2014-11-01

    Errors in the delivery of medical care are the principal cause of inpatient mortality and morbidity, accounting for around 98,000 deaths in the United States of America (USA) annually. Ineffective team communication, especially in the operation room (OR), is a major root of these errors. This miscommunication can be reduced by analyzing and constructing a conceptual model of communication and miscommunication in the OR. We introduce the principles underlying Object-Process Methodology (OPM)-based modeling of the intricate interactions between the surgeon and the surgical technician while handling surgical instruments in the OR. This model is a software- and hardware-independent description of the agents engaged in communication events, their physical activities, and their interactions. The model enables assessing whether the task-related objectives of the surgical procedure were achieved and completed successfully and what errors can occur during the communication. The facts used to construct the model were gathered from observations of various types of operations miscommunications in the operating room and its outcomes. The model takes advantage of the compact ontology of OPM, which is comprised of stateful objects - things that exist physically or informatically, and processes - things that transform objects by creating them, consuming them or changing their state. The modeled communication modalities are verbal and non-verbal, and errors are modeled as processes that deviate from the "sunny day" scenario. Using OPM refinement mechanism of in-zooming, key processes are drilled into and elaborated, along with the objects that are required as agents or instruments, or objects that these processes transform. The model was developed through an iterative process of observation, modeling, group discussions, and simplification. The model faithfully represents the processes related to tool handling that take place in an OR during an operation. The specification is at

  11. Fundamentals of using bio-diesel for operating large fleets of mining equipment and building machines and the experience gained so far

    International Nuclear Information System (INIS)

    Drebenstedt, C.; Jauer, J.

    2008-01-01

    Against the topical background of the finite reserves of fossil mineral oil as well as internationally available vegetable fat and oil resources, of the current developments in the field of the biodiesel production technology and of the international conditions for the reduction of CO 2 emissions, this paper is to examine, whether the suitability of bio-diesel for fuelling mining equipment has come true. The examination will focus on the biogenic fuel profile, on the organizational necessity to actively retrofit the machinery during operations as well as on the precise verification of the expected technical conversion problems and of the saving potentials actually achieved. The examination will be conducted in the world's first open-cast mine that has converted its entire fleet of equipment to be fuelled with bio-diesel. The open-cast mine is operated by the Ronneburg branch of Wismut GmbH, a company based in Germany (referred to hereinafter as the Lichtenberg open-cast mine). (orig.)

  12. Liner Shipping Fleet Repositioning

    DEFF Research Database (Denmark)

    Tierney, Kevin; Jensen, Rune Møller

    2011-01-01

    Liner shipping fleet repositioning consists of moving vessels between services in a liner ship- ping network in order to better orient the overall network to the world economy, and to ensure the proper maintenance of vessels. Thus, fleet repositioning involves sailing and loading activities subject...

  13. Maximizing your fleet

    Energy Technology Data Exchange (ETDEWEB)

    Lytle, J. [GE Capital Rail Services, Calgary, AB (Canada)

    2001-07-01

    A series of viewgraphs were presented to illustrate this discussion which focused on the economics of the railroad environment in 2001 and beyond. Fleet productivity and customer relations were described. The viewgraphs were entitled: new car builds; fleet demographics for North American LPG/AA fleet; and, issues and trends of North American LPG/AA fleet. It was noted that there is a continued demand for North American LPG/AA fleet as cars are phased out. GE Capital Rail Services is addressing the future by focusing on the following four initiatives: service, globalization, building a six sigma company, and transforming into an e-business. The company's six sigma approach is based on customer orientation, safety and compliance, quality and reliability, productivity and planning, cost, and people and culture. The actions taken thus far have been a planned maintenance program, the relocation of safety valves, and the elimination of early failures. figs.

  14. Fleet Feedback and Fleet Efficiency Metrics

    Energy Technology Data Exchange (ETDEWEB)

    Singer, Mark R [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-05

    The Marine Corps have 10 years of experience implementing a telematics program and several lessons to share with partner agencies. This presentation details results of a Marine Corps survey as well as methods of using telematics to promote fleet efficiency and optimize the vehicle acquisition process.

  15. Federal Fleet Report

    Data.gov (United States)

    General Services Administration — Annual report of Federal agencies' motor vehicle fleet data collected in the Federal Automotive Statistical Tool (FAST), a web-based reporting tool cosponsored by...

  16. Fleet management performance monitoring.

    Science.gov (United States)

    2013-05-01

    The principle goal of this project was to enhance and expand the analytical modeling methodology previously developed as part of the Fleet Management Criteria: Disposal Points and Utilization Rates project completed in 2010. The enhanced and ex...

  17. Fishing fleet profiling methodology

    National Research Council Canada - National Science Library

    Ferraris, Jocelyne

    2002-01-01

    A fishing fleet profile aims tho assist in understanding the complexity and structure of fisheries from a technical and socio-economic point of view, or from the point of view of fishing strategies...

  18. Fleet DNA (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Walkokwicz, K.; Duran, A.

    2014-06-01

    The Fleet DNA project objectives include capturing and quantifying drive cycle and technology variation for the multitude of medium- and heavy-duty vocations; providing a common data storage warehouse for medium- and heavy-duty vehicle fleet data across DOE activities and laboratories; and integrating existing DOE tools, models, and analyses to provide data-driven decision making capabilities. Fleet DNA advantages include: for Government - providing in-use data for standard drive cycle development, R&D, tech targets, and rule making; for OEMs - real-world usage datasets provide concrete examples of customer use profiles; for fleets - vocational datasets help illustrate how to maximize return on technology investments; for Funding Agencies - ways are revealed to optimize the impact of financial incentive offers; and for researchers -a data source is provided for modeling and simulation.

  19. The development and operation of the international solar-terrestrial physics central data handling facility

    Science.gov (United States)

    Lehtonen, Kenneth

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) International Solar-Terrestrial Physics (ISTP) Program is committed to the development of a comprehensive, multi-mission ground data system which will support a variety of national and international scientific missions in an effort to study the flow of energy from the sun through the Earth-space environment, known as the geospace. A major component of the ISTP ground data system is an ISTP-dedicated Central Data Handling Facility (CDHF). Acquisition, development, and operation of the ISTP CDHF were delegated by the ISTP Project Office within the Flight Projects Directorate to the Information Processing Division (IPD) within the Mission Operations and Data Systems Directorate (MO&DSD). The ISTP CDHF supports the receipt, storage, and electronic access of the full complement of ISTP Level-zero science data; serves as the linchpin for the centralized processing and long-term storage of all key parameters generated either by the ISTP CDHF itself or received from external, ISTP Program approved sources; and provides the required networking and 'science-friendly' interfaces for the ISTP investigators. Once connected to the ISTP CDHF, the online catalog of key parameters can be browsed from their remote processing facilities for the immediate electronic receipt of selected key parameters using the NASA Science Internet (NSI), managed by NASA's Ames Research Center. The purpose of this paper is twofold: (1) to describe how the ISTP CDHF was successfully implemented and operated to support initially the Japanese Geomagnetic Tail (GEOTAIL) mission and correlative science investigations, and (2) to describe how the ISTP CDHF has been enhanced to support ongoing as well as future ISTP missions. Emphasis will be placed on how various project management approaches were undertaken that proved to be highly effective in delivering an operational ISTP CDHF to the Project on schedule and

  20. Fleet Tools; NREL (National Renewable Energy Laboratory)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-04-01

    From beverage distributors to shipping companies and federal agencies, industry leaders turn to the National Renewable Energy Laboratory (NREL) to help green their fleet operations. Cost, efficiency, and reliability are top priorities for fleets, and NREL partners know the lab’s portfolio of tools can pinpoint fuel efficiency and emissions-reduction strategies that also support operational the bottom line. NREL is one of the nation’s foremost leaders in medium- and heavy-duty vehicle research and development (R&D) and the go-to source for credible, validated transportation data. NREL developers have drawn on this expertise to create tools grounded in the real-world experiences of commercial and government fleets. Operators can use this comprehensive set of technology- and fuel-neutral tools to explore and analyze equipment and practices, energy-saving strategies, and other operational variables to ensure meaningful performance, financial, and environmental benefits.

  1. Size and transportation capabilities of the existing US cask fleet

    International Nuclear Information System (INIS)

    Danese, F.L.; Johnson, P.E.; Joy, D.S.

    1990-01-01

    This study investigates the current spent nuclear fuel cask fleet capability in the United States. In addition, it assesses the degree to which the current fleet would be available, as a contingency, until proposed Office of Civilian Radioactive Waste Management casks become operational. A limited fleet of ten spent fuel transportation casks is found to be readily available for use in Federal waste management efforts over the next decade

  2. Fleet wide motor asset management program

    International Nuclear Information System (INIS)

    Rosemeier, R.G.; Moxie, J.J.; Mendez, W.E.

    2011-01-01

    The Institute of Nuclear Power Operations (INPO) performed several studies concerning the effects of motor failures on US power production. Problems with aging and the lack of preventative maintenance were noted as major contributors to this production loss. Westinghouse has developed, and successfully utilized, a computer program to assist plants in the decision making process for maximizing the operational availability of their motor fleet. The program considers motors of a fleet as a single, critical to production asset, and aids the operator in decisions regarding the following: 1.) Purchase of spares. 2.) Rewind and refurbishment prioritization. 3.) Long-term budget forecasting. (author)

  3. Evaluation of design and operation of fuel handling systems for 25 MW biomass fueled CFB power plants

    International Nuclear Information System (INIS)

    Precht, D.

    1991-01-01

    Two circulating fluidized bed, biomass fueled, 25MW power plants were placed into operation by Thermo Electron Energy Systems in California during late 1989. This paper discusses the initial fuel and system considerations, system design, actual operating fuel characterisitics, system operation during the first year and modifications. Biomass fuels handled by the system include urban/manufacturing wood wastes and agricultural wastes in the form of orchard prunings, vineyard prunings, pits, shells, rice hulls and straws. Equipment utilized in the fuel handling system are described and costs are evaluated. Lessons learned from the design and operational experience are offered for consideration on future biomass fueled installations where definition of fuel quality and type is subject to change

  4. Fleet management tools for the utility industry

    Energy Technology Data Exchange (ETDEWEB)

    Caywood, J. [Terex Telelect, Watertown, SD (United States)

    2002-08-01

    In order to enable fleet managers to make the appropriate decisions concerning buying, selling, renting, leasing or repairing vehicles, information about ownership and operating cost and utilization are important. Fleet management tools are now available in the heavy construction industry. The author describes one such fleet management services customized for the utility industry: FleetEdge. This system utilizes current and future technologies to enable the managers to take proactive or predictive approaches to fleet management. An example of a company that has opted for this system was reviewed: Reliant Energy-Houston Metro. The data collection process was explained. A mini-computer processor is fitted on the equipment, and the requested monitoring parameters in turn determine the variety of sensors and alarms to be selected. Location can also be monitored through the use of Global Positioning System (GPS) equipment. The parameters normally include low engine oil pressure, high engine operating temperature, high transmission operating temperature, high hydraulic oil temperature, engine hours. Wireless data transfer is effected via cellular or satellite networks. The data is then collected and checked for errors and format at a hub before going to the computer server through the Internet. Information is transmitted from the accounting system to fleet management service through a secure interface. The data is then configured to meet the client's needs. It results in up to date, understandable information to the client. Equipment utilization, downtime and cost by machine or category is easily accessible and printed if required. Fleet equipment status is provided, as well as hourly cost analysis. Other reports are also available. 2 tabs., 2 figs.

  5. Commercial vehicle fleet management and information systems. Technical memorandum 2 : summary of case study interviews

    Science.gov (United States)

    1997-10-01

    The FHWA has commissioned the Commercial Vehicle Fleet Management and Information Systems study to determine if there are fleet management needs that the public sector can address through the development of ITS for commercial vehicle operations. As p...

  6. Optimal event handling by multiple unmanned aerial vehicles

    NARCIS (Netherlands)

    de Roo, Martijn; Frasca, Paolo; Carloni, Raffaella

    This paper proposes a control architecture for a fleet of unmanned aerial vehicles that is responsible for handling the events that take place in a given area. The architecture guarantees that each event is handled by the required number of vehicles in the shortest time, while the rest of the fleet

  7. Alternative fuelds in urban fleets

    Energy Technology Data Exchange (ETDEWEB)

    Lindsay, T.

    1994-12-31

    In this presentation the author addresses four main objectives. They are to: discuss programs that are driving the introduction of alternative fuels into fleet operations in urban areas around the country; define alternative fuels; quantify the present use and future projections on alternative fuel vehicles (AVFs) in the Chicago metropolitan statistical area; and discuss benefits of increased use of alternative fuels in urban areas. Factors which touch on these points include: present domestic dependence on petroleum for autos, with usage exceeding production; the large populations in urban areas which do not meet Clean Air Standards; recent legislative initiatives which give guidance and aid in the adoption of such strategies.

  8. Alternative fuelds in urban fleets

    International Nuclear Information System (INIS)

    Lindsay, T.

    1994-01-01

    In this presentation the author addresses four main objectives. They are to: discuss programs that are driving the introduction of alternative fuels into fleet operations in urban areas around the country; define alternative fuels; quantify the present use and future projections on alternative fuel vehicles (AVFs) in the Chicago metropolitan statistical area; and discuss benefits of increased use of alternative fuels in urban areas. Factors which touch on these points include: present domestic dependence on petroleum for autos, with usage exceeding production; the large populations in urban areas which do not meet Clean Air Standards; recent legislative initiatives which give guidance and aid in the adoption of such strategies

  9. Operational analysis and improvement of a spent nuclear fuel handling and treatment facility using discrete event simulation

    International Nuclear Information System (INIS)

    Garcia, H.E.

    2000-01-01

    Spent nuclear fuel handling and treatment often require facilities with a high level of operational complexity. Simulation models can reveal undesirable characteristics and production problems before they become readily apparent during system operations. The value of this approach is illustrated here through an operational study, using discrete event modeling techniques, to analyze the Fuel Conditioning Facility at Argonne National Laboratory and to identify enhanced nuclear waste treatment configurations. The modeling approach and results of what-if studies are discussed. An example on how to improve productivity is presented.

  10. Transportation capabilities of the existing cask fleet

    International Nuclear Information System (INIS)

    Johnson, P.E.; Joy, D.S.; Wankerl, M.W.

    1991-01-01

    This paper describes a number of scenarios estimating the amount of spent nuclear fuel that could be transported to a Monitored Retrievable Storage (MRS) Facility by various combinations of existing cask fleets. To develop the scenarios, the data provided by the Transportation System Data Base (TSDB) were modified to reflect the additional time for cask turnaround resulting from various startup and transportation issues. With these more realistic speed and cask-handling assumptions, the annual transportation capability of a fleet consisting of all of the existing casks is approximately 46 metric tons of uranium (MTU). The most likely fleet of existing casks that would be made available to the Department of Energy (DOE) consists of two rail, three overweight truck, and six legal weight truck casks. Under the same transportation assumptions, this cask fleet is capable of approximately transporting 270 MTU/year. These ranges of capability is a result of the assumptions pertaining to the number of casks assumed to be available. It should be noted that this assessment assumes additional casks based on existing certifications are not fabricated. 5 refs., 4 tabs

  11. Transportation capabilities of the existing cask fleet

    International Nuclear Information System (INIS)

    Johnson, P.E.; Wankerl, M.W.; Joy, D.S.

    1991-01-01

    This paper describes a number of scenarios estimating the amount of spent nuclear fuel that could be transported to a Monitored Retrievable Storage (MRS) Facility by various combinations of existing cask fleets. To develop the scenarios, the data provided by the Transportation System Data Base (TSDB) were modified to reflect the additional time for cask turnaround resulting from various startup and transportation issues. With these more realistic speed and cask-handling assumptions, the annual transportation capability of a fleet consisting of all of the existing casks is approximately 465 metric tons of uranium (MTU). The most likely fleet of existing casks that would be made available to the DOE consists of two rail, three overweight truck, and six legal weight truck casks. Under the same transportation assumptions, this cask fleet is capable of approximately transporting 270 MTU/year. These ranges of capability is a result of the assumptions pertaining to the number of casks assumed to be available. It should be noted that this assessment assumes additional casks based on existing certifications are not fabricated

  12. The liquefied natural gas infrastructure and tanker fleet sizing problem

    DEFF Research Database (Denmark)

    Koza, David Franz; Røpke, Stefan; Molas, Anna Boleda

    2017-01-01

    We consider a strategic infrastructure and tanker fleet sizing problem in the liquefied natural gas business. The goal is to minimize long-term on-shore infrastructure and tanker investment cost combined with interrelated expected cost for operating the tanker fleet. A non-linear arc-based model...

  13. Conceptual design of a generic pulse schedule and event handling editor for improved fusion device operation

    International Nuclear Information System (INIS)

    Barana, Oliviero; Nouailletas, Rémy; Brémond, Sylvain; Moreau, Philippe; Allegretti, Ludovic; Balme, Stéphane; Ravenel, Nathalie; Mannori, Simone; Guillerminet, Bernard; Leroux, Fabrice; Douai, David; Nardon, Eric; Hertout, Patrick; Saint-Laurent, François

    2013-01-01

    Highlights: ► Real-time event handling requires extended functionalities of pulse schedule editors and plasma control systems ► A new pulse schedule editor, conceived for parameterization of systematic off-normal event handling, is described ► A global, generic approach on off-normal event handling is highlighted ► The functional architecture of an off-normal event handling oriented plasma control system is discussed ► The main objects of the pulse schedule editor are the segment-descriptor object and the scenario-descriptor object. -- Abstract: Coping with unexpected events is an important issue of nuclear fusion experiments. The future machines, characterized by very long plasma discharges and actively cooled metallic plasma-facing components, will require a systematic intervention in real time, in order to maximize the performance and protect the investment. The real-time management of events will require extending the functionalities of the current pulse schedule editors with the possibility of using reference waveforms provided with acceptability margins and setting up advanced mitigation strategies and event countermeasures. With this purpose, a new pulse schedule editor, based on a time-segment approach for the preparation of experimental scenarios, is being conceived on Tore Supra, together with a new plasma control system. This paper will report on their conceptual design and give account of the preliminary results of a feasibility study currently under way in order to prepare a possible implementation on Tore Supra

  14. Conceptual design of a generic pulse schedule and event handling editor for improved fusion device operation

    Energy Technology Data Exchange (ETDEWEB)

    Barana, Oliviero, E-mail: oliviero.barana@cea.fr [CEA, IRFM, F-13108 Saint-Paul-Lez Durance (France); Nouailletas, Rémy; Brémond, Sylvain; Moreau, Philippe; Allegretti, Ludovic; Balme, Stéphane; Ravenel, Nathalie [CEA, IRFM, F-13108 Saint-Paul-Lez Durance (France); Mannori, Simone [ENEA C.R. Brasimone, 40032 Camugnano (Italy); Guillerminet, Bernard; Leroux, Fabrice; Douai, David; Nardon, Eric; Hertout, Patrick; Saint-Laurent, François [CEA, IRFM, F-13108 Saint-Paul-Lez Durance (France)

    2013-10-15

    Highlights: ► Real-time event handling requires extended functionalities of pulse schedule editors and plasma control systems ► A new pulse schedule editor, conceived for parameterization of systematic off-normal event handling, is described ► A global, generic approach on off-normal event handling is highlighted ► The functional architecture of an off-normal event handling oriented plasma control system is discussed ► The main objects of the pulse schedule editor are the segment-descriptor object and the scenario-descriptor object. -- Abstract: Coping with unexpected events is an important issue of nuclear fusion experiments. The future machines, characterized by very long plasma discharges and actively cooled metallic plasma-facing components, will require a systematic intervention in real time, in order to maximize the performance and protect the investment. The real-time management of events will require extending the functionalities of the current pulse schedule editors with the possibility of using reference waveforms provided with acceptability margins and setting up advanced mitigation strategies and event countermeasures. With this purpose, a new pulse schedule editor, based on a time-segment approach for the preparation of experimental scenarios, is being conceived on Tore Supra, together with a new plasma control system. This paper will report on their conceptual design and give account of the preliminary results of a feasibility study currently under way in order to prepare a possible implementation on Tore Supra.

  15. The Russian Northern Fleet. Sources of radioactive contamination

    Energy Technology Data Exchange (ETDEWEB)

    Nilsen, T [Bellona Foundation, Oslo (Norway); Kudrik, I [Bellona Foundation Branch Office, Murmansk (Russian Federation); Nikitin, A [Scientific Production Association ` ` Typhoon` ` , Obninsk (Russian Federation)

    1996-08-01

    The report describes the problems that the Russian Northern Fleet is experiencing with its nuclear powered vessels and with the storage of spent fuel and other nuclear wastes that the operation of these vessels generates. One of the most serious problems is the lack of regional storage and treatment facilities for radioactive waste. This waste is now deposited haphazardly throughout the various navy yards and bases. The establishment of a regional storage facility for spent fuel, radioactive reactor components, and liquid and solid nuclear waste is a necessary precondition for carrying out the decommissioning of nuclear submarines in an environmentally viable manner. A recurrent theme in the report is the lack of civilian control over the different Northern Fleet nuclear facilities. This leads to a disregard of international recommendations with regard to the handling of nuclear waste. Considerable effort has been made to provide comprehensive references in the report, making it clear that the authors sources of information have been open. By presenting this information the authors hope to contribute to increased insight and consequently to help realize necessary national and international measures. 93 refs.

  16. The Russian Northern Fleet. Sources of radioactive contamination

    International Nuclear Information System (INIS)

    Nilsen, T.; Kudrik, I.; Nikitin, A.

    1996-08-01

    The report describes the problems that the Russian Northern Fleet is experiencing with its nuclear powered vessels and with the storage of spent fuel and other nuclear wastes that the operation of these vessels generates. One of the most serious problems is the lack of regional storage and treatment facilities for radioactive waste. This waste is now deposited haphazardly throughout the various navy yards and bases. The establishment of a regional storage facility for spent fuel, radioactive reactor components, and liquid and solid nuclear waste is a necessary precondition for carrying out the decommissioning of nuclear submarines in an environmentally viable manner. A recurrent theme in the report is the lack of civilian control over the different Northern Fleet nuclear facilities. This leads to a disregard of international recommendations with regard to the handling of nuclear waste. Considerable effort has been made to provide comprehensive references in the report, making it clear that the authors sources of information have been open. By presenting this information the authors hope to contribute to increased insight and consequently to help realize necessary national and international measures. 93 refs

  17. Analysis of operational, institutional and international limitations for alternative fuel vehicles and technologies: Means/methods for implementing changes. [Public fleet groups--information needs

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    This project focused upon the development of an approach to assist public fleet managers in evaluating the characteristics and availability of alternative fuels (AF's) and alternative fuel vehicles (AFV's) that will serve as possible replacements for vehicles currently serving the needs of various public entities. Also of concern were the institutional/international limitations for alternative fuels and alternative fuel vehicles. The City of Detroit and other public agencies in the Detroit area were the particular focus for the activities. As the development and initial stages of use of alternative fuels and alternative fuel vehicles proceeds, there will be an increasing need to provide information and guidance to decision-makers regarding differences in requirements and features of these fuels and vehicles. There wig be true differences in requirements for servicing, managing, and regulating. There will also be misunderstanding and misperception. There have been volumes of data collected on AFV'S, and as technology is improved, new data is constantly added. There are not, however, condensed and effective sources of information for public vehicle fleet managers on vehicle and equipment sources, characteristics, performance, costs, and environmental benefits. While theoretical modeling of public fleet requirements has been done, there do not seem to be readily available practical''. There is a need to provide the best possible information and means to minimize the problems for introducing the effective use of alternative fuels and alternative fuel vehicles.

  18. 48 CFR 970.5223-5 - DOE motor vehicle fleet fuel efficiency.

    Science.gov (United States)

    2010-10-01

    ... and Contract Clauses for Management and Operating Contracts 970.5223-5 DOE motor vehicle fleet fuel..., insert the following clause in contracts providing for Contractor management of the motor vehicle fleet... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOE motor vehicle fleet...

  19. Integration of transport and handling equipment at CERN criteria to satisfy operational needs and safety aspects

    CERN Document Server

    Bertone, C; CERN. Geneva. TS Department

    2004-01-01

    Within the last 4 years TS-IC-HM (former ST-HM group) integrated about 150 transport and handling supplies including 29 cranes, 20 fork lift trucks, 60 tunnel vehicles. Most of these are standardised supplies, but very often special functionality has been implemented and the complexity of the equipment has been increased. With the Rocla cryo-dipol transporters even prototype equipment was integrated that had been specially designed for CERN. This paper discusses the differences regarding the actions that have to be performed when the different kind of equipment have to be integrated.

  20. Interim design status and operational report for remote handling fixtures: primary and secondary burners

    International Nuclear Information System (INIS)

    Burgoyne, R.M.

    1976-12-01

    The HTGR reprocessing flowsheet consists of two basic process elements: (1) spent fuel crushing and burning and (2) solvent extraction. Fundamental to these elements is the design and development of specialized process equipment and support facilities. A major consideration of this design and development program is equipment maintenance: specifically, the design and demonstration of selected remote maintenance capabilities and the integration of these into process equipment design. This report documents the current status of the development of remote handling and maintenance fixtures for the primary and secondary burners

  1. Routing and scheduling and fleet management for liner shipping

    DEFF Research Database (Denmark)

    Kjeldsen, Karina Hjortshøj

    2009-01-01

    The problem of routing, scheduling and fleet management in global liner shipping is presented. The developed model incorporates the ships' speed as a decision variable. Furthermore, the model must be able to handle problems of the size and complexity experienced by the global liner shipping...

  2. BioFleet case studies

    International Nuclear Information System (INIS)

    2007-01-01

    These six case studies examined the use of different biodiesel blends as fuel supply sources for businesses in British Columbia (BC). In the first case study, 6 municipalities participated in a pilot program designed to compare the performance of biodiesel and diesel fuels. Each municipality operated 2 base vehicles running on conventional diesel along with 2 similar vehicles which used biodiesel. Real time emissions tests and analyses of the vehicles using biodiesel were also conducted by 2 of the participating municipalities. All municipalities participating in the study agreed to purchase significant volumes of biodiesel. The second case study described a pilot study conducted by the City of Vancouver's equipment services branch in 2004. As a result of the study, the city now has over 530 types of equipment that use biodiesel. The third case study described a program designed by TSI Terminals in Vancouver to assess the emission reduction impact of using biodiesel at its port facility. Six different pieces of equipment were used to confirm that biodiesel could be used throughout the terminal. Test results confirmed that biodiesel blends could be used to reduce emissions. Overall emissions were reduced by 30 per cent. The fourth case study described a waste renderer that used a fleet of 36 trucks to deliver raw products to its plants. The company made the decision to use only biodiesel for its entire fleet of trucks. Since July 2005, the company has logged over 1.7 million km using biodiesel blends. The fifth case study described a salmon hatchery that switched from diesel to biodiesel in order to reduce emissions. The biodiesel blends are used to fuel the hatchery's 2 diesel generators. The hatchery has reduced emissions of greenhouse gases (GHGs) by an estimated 1800 tonnes annually. The sixth case study described how the Township of Langley has started using biodiesel for its entire fleet of of approximately 250 pieces of equipment. The township has not

  3. Advanced technology mobile robotics vehicle fleet

    International Nuclear Information System (INIS)

    McGovern, D.E.

    1987-03-01

    A fleet of vehicles is being developed and maintained by Sandia National Laboratories for studies in remote control and autonomous operation. The vehicles range from modified commercial vehicles to specially constructed mobile platforms and are utilized as testbeds for developing concepts in the areas of remote control (teleoperation) and computer control (autonomy). Actuators control the vehicle speed, brakes, and steering via manual input from a remote driving station or through some level of digital computer control. On-board processing may include simple vehicle control functions or may allow for unmanned, autonomous operation. Communication links are provided for digital communication between control computers, television transmission for vehicle vision, and voice for local control. SNL can develop, test, and evaluate sensors, processing requirements, various methods of actuator implementation, operator controlled feedback requirements, and vehicle operations. A description of the major features and uses for each of the vehicles in the fleet is provided

  4. Relevance of the main postharvest handling operations on the development of brown rot disease on stone fruits.

    Science.gov (United States)

    Bernat, Maria; Segarra, Joan; Casals, Carla; Teixidó, Neus; Torres, Rosario; Usall, Josep

    2017-12-01

    Brown rot caused by Monilinia spp. is one of the most important postharvest diseases of stone fruit. The aim of this study was to evaluate the relevance of the main postharvest operations of fruit - hydrocooling, cold room, water dump, sorting and cooling tunnel - in the development of M. laxa on peaches and nectarines artificially infected 48, 24 or 2 h before postharvest operations. Commercial hydrocooling operation reduced incidence to 10% in 'Pp 100' nectarine inoculated 2 and 24 h before this operation; however, in 'Fantasia' nectarine incidence was not reduced, although lesion diameter was decreased in all studied varieties. Hydrocooling operation for 10 min and 40 mg L -1 of sodium hypochlorite reduced brown rot incidence by 50-77% in nectarines inoculated 2 h before operation; however, in peach varieties it was not reduced. Water dump operation showed reduction of incidence on nectarine infected 2 h before immersion for 30 s in clean water at 4 °C and 40 mg L -1 sodium hypochlorite; however, in peach varieties it was not reduced. Cold room, sorting and cooling tunnel operation did not reduce brown rot incidence. From all studied handling operations on stone fruit packing houses, hydrocooling is the most relevant in the development of brown rot disease. Duration of the treatment seems to be more important than chlorine concentration. In addition, hydrocooling and water dump were less relevant in peaches than in nectarines. As a general trend, hydrocooling and water dump reduced incidence on fruit with recent infections (2 or 24 h before operation); however, when infections have been established (48 h before operation) diseases were not reduced. © 2017 Society of Chemical Industry. © 2017 Society of Chemical Industry.

  5. Fleets of enduring drones to probe atmospheric phenomena with clouds

    Science.gov (United States)

    Lacroix, Simon; Roberts, Greg; Benard, Emmanuel; Bronz, Murat; Burnet, Frédéric; Bouhoubeiny, Elkhedim; Condomines, Jean-Philippe; Doll, Carsten; Hattenberger, Gautier; Lamraoui, Fayçal; Renzaglia, Alessandro; Reymann, Christophe

    2016-04-01

    technologies are challenged at the low speeds of lightweight UAVs. The overall control of the fleet so as to gather series of synchronized data in the cloud volume is a poorly informed and highly constrained adaptive sampling problem, in which the UAV motions must be defined to maximize the amount of gathered information and the mission duration. The overall approach casts the problem in a hierarchy of two modeling and decision stages. A macroscopic parametrized model of the cloud is built from the gathered data and exploited at the higher level by an operator, who sets information gathering goals. A subset of the UAV fleet is allocated to each goal, considering the current fleet state. These high level goals are handled by the lower level, which autonomously optimizes the selected UAVs trajectories using an on-line updated dense model of the variables of interest. Building the models involves Gaussian processes techniques (kriging) to fuse the gathered data with a generic cumulus conceptual model, the latter being defined from thorough statistics on realistic MesoNH cloud simulations. The model is exploited by a planner to generate trajectories that minimize the uncertainty in the map, while steering the vehicles within the air flows to save energy.

  6. Design of the HANARO operator workstation having the enhanced usability and data handling capability

    International Nuclear Information System (INIS)

    Kim, M. J.; Kim, Y. K.; Jung, H. S.; Choi, Y. S.; Woo, J. S.; Jeon, B. J.

    2003-01-01

    As a first step to the upgrade plan of the HANARO reactor control computer system, we furnished IBM workstation class PC to replace the existing operator workstation, the dedicated HMI console. Also designed is the new human-machine interface by using the commercial HMI development software that is operating on the MS-Windows. We expect that we would not have any more difficulties in preparing replacement parts and providing maintenance of hardware. In this paper, we introduce the features of new interface, which adopted the virtue of the existing design and enabled the safe and efficient reactor operation by correcting the demerits. Also described are the functionality of historian server that provides the simpler storage, retrieval and search operation and the design of trend display screen that replaces the existing chart recorder by using the dual monitor feature of PC graphic card

  7. The Multibeam Advisory Committee (MAC): a search for solutions for collecting consistent high quality multibeam data across multiple ships, systems, and operators in the U.S. Academic Fleet.

    Science.gov (United States)

    Johnson, P. D.; Ferrini, V. L.; Jerram, K.

    2016-12-01

    In 2015 the National Science Foundation funded the University of New Hampshire's Center for Coastal and Ocean Mapping and Lamont-Doherty Earth Observatory, for the second time, to coordinate the effort of standardizing the quality of multibeam echosounder (MBES) data across the U.S. academic fleet. This effort supports 9 different ship operating institutions who manage a total of 12 multibeam-equipped ships carrying 6 different MBES systems, manufactured by two different companies. These MBES are designed to operate over a very wide range of depths and operational modes. The complexity of this endeavor led to the creation of the Multibeam Advisory Committee (MAC), a team of academic and industry experts whose mission is to support the needs of the U.S academic fleet's multibeam echo sounders through all of the phases of the "life" of a MBES system and its data, from initial acceptance of the system, to recommendations on at-sea acquisition of data, to validation of already installed systems, and finally to the post-survey data evaluation. The main activities of the MAC include 1.) standardizing both the Shipboard Acceptance Testing of all new systems and Quality Assurance Testing of already installed systems, 2.) working with the both the ship operators/technicians and the manufacturers of the multibeam systems to guarantee that each MBES is working at its peak performance level, 3.) developing tools that aid in the collection of data, assessment of the MBES hardware, and evaluation of the quality of the MBES data, 4.) creating "best practices" documentation concerning data acquisition and workflow, and 5.) providing a website, http://mac.unols.org, to host technical information, tools, reports, and a "help desk" for operators of the systems to ask questions concerning issues that they see with their systems.

  8. Application work risk of manual material handling operators using different lifting methods

    Science.gov (United States)

    Anizar; Matondang, AR; Sibarani, JA

    2018-02-01

    This study observed the activity of lifting and moving crates containing bottles at a pallet station in a carbonated drink factory. The activity of moving crates, each weighing 15 kg, is performed by four operators using different methods. An operator manually moves 250 crates daily and often takes rest during working. This study aims to find the most efficient method, that is using the least energy, to move crates. The workload is assessed using the method of Cardiovascular Strain Load (CVL) and energy expenditure. Operators’ arterial pulse is measured for 1 minute right before they start working and after they finish working; this is done to obtain work arterial pulse and rest arterial pulse. The way operators lift crates is analyzed using biomechanics. It is found that fatigue is experienced by all operators, with the exception of the 3rd operator who has a %CVL number below 30%. He positions the pallet to be parallel to the conveyor, and then stand in between during the lifting process. He only rotates his body to move the crate from the conveyor onto the pallet, requiring only little energy. This is one of the reasons why the %CVL number is lower than the other operators.

  9. An approach to the drone fleet survivability assessment based on a stochastic continues-time model

    Science.gov (United States)

    Kharchenko, Vyacheslav; Fesenko, Herman; Doukas, Nikos

    2017-09-01

    An approach and the algorithm to the drone fleet survivability assessment based on a stochastic continues-time model are proposed. The input data are the number of the drones, the drone fleet redundancy coefficient, the drone stability and restoration rate, the limit deviation from the norms of the drone fleet recovery, the drone fleet operational availability coefficient, the probability of the drone failure-free operation, time needed for performing the required tasks by the drone fleet. The ways for improving the recoverable drone fleet survivability taking into account amazing factors of system accident are suggested. Dependencies of the drone fleet survivability rate both on the drone stability and the number of the drones are analysed.

  10. Microcomputer simulation model for facility performance assessment: a case study of nuclear spent fuel handling facility operations

    International Nuclear Information System (INIS)

    Chockie, A.D.; Hostick, C.J.; Otis, P.T.

    1985-10-01

    A microcomputer based simulation model was recently developed at the Pacific Northwest Laboratory (PNL) to assist in the evaluation of design alternatives for a proposed facility to receive, consolidate and store nuclear spent fuel from US commercial power plants. Previous performance assessments were limited to deterministic calculations and Gantt chart representations of the facility operations. To insure that the design of the facility will be adequate to meet the specified throughput requirements, the simulation model was used to analyze such factors as material flow, equipment capability and the interface between the MRS facility and the nuclear waste transportation system. The simulation analysis model was based on commercially available software and application programs designed to represent the MRS waste handling facility operations. The results of the evaluation were used by the design review team at PNL to identify areas where design modifications should be considered. 4 figs

  11. Municipal green fleet management in Ontario: best practices manual 2008

    Energy Technology Data Exchange (ETDEWEB)

    Felder, M.

    2008-07-01

    When households, institutional and commercial buildings, industry, and especially auto transportation use fossil fuel based energy, they generate carbon dioxide emissions. Considering the environmental concerns and the soaring fuel prices, this could be the opportunity for the municipal fleet operator to assume a leadership position regarding environmental issues and look for new cost efficiencies. To begin, a meticulous examination of the fuel expenditures, a good management approach of fleet operations and a clearly defined system or guidance for lowering fleet fuel costs would be helpful for municipal fleet managers. This document is involved in a pilot program aimed at helping Ontario municipalities understand and promote fleet efficiencies and obtain related environmental benefits. Existing and cost-effective automotive fleet management policies and practices that can mitigate pollution causing global warming are given in this guide. These policies and practices also allow money savings and contribute to a better workplace health and livability of the community. This document is based on the experience of fleet management experts and local governments in Ontario. 54 refs.

  12. Water hydraulic manipulator for fail safe and fault tolerant remote handling operations at ITER

    International Nuclear Information System (INIS)

    Nieminen, Peetu; Esque, Salvador; Muhammad, Ali; Mattila, Jouni; Vaeyrynen, Jukka; Siuko, Mikko; Vilenius, Matti

    2009-01-01

    Department of Intelligent Hydraulics and Automation (IHA) of Tampere University of Technology has been involved in the European Fusion program since 1994 within the ITER reactor maintenance activities. In this paper we discuss the design and development of a six degrees of freedom water hydraulic manipulator with a force feedback for teleoperation tasks. The manipulator is planned to be delivered to Divertor Test Platform 2 (DTP2) during year 2008. The paper also discusses the possibility to improve the fail safe and redundant operation of the manipulator. During the design of the water hydraulic manipulator, special provisions have been made in order to meet the safety requirements such as servo valve block for redundant operation and safety vane brakes for fail safe operation.

  13. DESIGNING OF AN AUTOMOBILE FLEET NETWORK

    Directory of Open Access Journals (Sweden)

    R. B. Ivut

    2016-01-01

    Full Text Available Investment volume is considered as an important factor in regional development under current conditions. Logistical infrastructure which ensures a complex transport, distributive, information and other services exerts a significant influence on regional investment attractiveness. Lack of clear vision on development and execution of development strategy for logistics infrastructure from the side of regional authorities results in unwillingness of large federal and transnational companies to provide investments in infrastructure projects. Network of automotive transport terminals is one of the main elements in logistics infrastructure. The network allows to optimize a flow of material goods from the point of their origin to the point of their consumption with the lowest possible costs and the required level of service. Automobile transport is one of the main objects of transport infrastructure and it is characterized by rather high flexibility in comparison with other types of transport facilities that preconditions its widespread application. Network of automobile fleets (terminals has been formed for redistribution of goods traffic within the concerned regions. The purpose of the present research is to develop a mathematical model for formation of transport infrastructure on the territory of regions. The paper proposes an approach for formation of automobile fleet (terminal network on the territory of a large region with due account of the established network of distribution and sorting-out warehouse facilities. A model has been developed for solving the problem pertaining to minimization of aggregate costs related to maintenance of automobile fleets, delivery of goods to and from distribution and sorting-out warehouse facilities to consumers, ferry of empty trucks and goods handling. The model makes it possible to determine optimal number and location area of automobile fleets (terminals while accounting for their possible locations, capacity

  14. Implementing Automotive Telematics for Fleet Insurance

    Directory of Open Access Journals (Sweden)

    Marika Azzopardi

    2013-12-01

    Full Text Available The advantages of Usage-Based Insurance for automotive covers over conventional rating methods have been discussed in literature for over four decades. Notwithstanding their adoption in insurance markets has been slow. This paper seeks to establish the viability of introducing fleet Telematics-Based Insurance by investigating the perceptions of insurance operators, tracking service providers and corporate fleet owners. At its core, the study involves a SWOT-analysis to appraise Telematics-Based Insurance against conventional premium rating systems. Twenty five key stakeholders in Malta, a country with an insurance industry that represents others in microcosm, were interviewed to develop our analysis. We assert that local insurers have interests in such insurance schemes as enhanced fleet management and monitoring translate into an improved insurance risk. The findings presented here have implications for all stakeholders as we argue that telematics enhance fleet management, TBI improves risk management for insurers and adoption of this technology is dependent on telematics providers increasing the perceived control by insurers over managing this technology.

  15. Operating experience with remote handling equipment in a typical hot facility

    International Nuclear Information System (INIS)

    Ravishankar, A.; Balasubramanian, G.R.

    1990-01-01

    Large number of articulated arm manipulators and special purpose remote tools have been used either alone or in combination in a recent campaign of treatment of irradiated J rods of CIRUS for separation of 233 U. These equipments were used for operations such as remote maintenance of centrifuge, centrifugal extractor, direct sampling, assistance for sample conveying operations etc. Paper discusses problems encountered in using articulated arm manipulators of type MAll,AMl and how they were overcome. Problems encountered in use of model-8 manipulator for chopper maintenence in a mockup facility are also highlighted. (author). 4 figs., 1 tab

  16. Human machine interface to manually drive rhombic like vehicles in remote handling operations

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, Pedro; Vale, Alberto [Instituto de Plasmas e Fusao Nuclear, Instituto Superior Tecnico, Universidade de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Ventura, Rodrigo [Institute for Systems and Robotics, Instituto Superior Tecnico, Universidade de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal)

    2015-07-01

    In the thermonuclear experimental reactor ITER, a vehicle named CTS is designed to transport a container with activated components inside the buildings. In nominal operations, the CTS is autonomously guided under supervision. However, in some unexpected situations, such as in rescue and recovery operations, the autonomous mode must be overridden and the CTS must be remotely guided by an operator. The CTS is a rhombic-like vehicle, with two drivable and steerable wheels along its longitudinal axis, providing omni-directional capabilities. The rhombic kinematics correspond to four control variables, which are difficult to manage in manual mode operation. This paper proposes a Human Machine Interface (HMI) to remotely guide the vehicle in manual mode. The proposed solution is implemented using a HMI with an encoder connected to a micro-controller and an analog 2-axis joystick. Experimental results were obtained comparing the proposed solution with other controller devices in different scenarios and using a software platform that simulates the kinematics and dynamics of the vehicle. (authors)

  17. PFP vault operations containers for Plutonium Handling and Storage Critical Characteristics

    International Nuclear Information System (INIS)

    BONADIE, E.P.

    2000-01-01

    This document specifies the critical characteristics for containers procured for Plutonium Finishing Plant's (PFP's) Vault Operations system as required by HNF-PRO-268 and HNF-PRO-1819. These are the minimum specifications that the equipment must meet in order to perform its safety function

  18. Human machine interface to manually drive rhombic like vehicles in remote handling operations

    International Nuclear Information System (INIS)

    Lopes, Pedro; Vale, Alberto; Ventura, Rodrigo

    2015-01-01

    In the thermonuclear experimental reactor ITER, a vehicle named CTS is designed to transport a container with activated components inside the buildings. In nominal operations, the CTS is autonomously guided under supervision. However, in some unexpected situations, such as in rescue and recovery operations, the autonomous mode must be overridden and the CTS must be remotely guided by an operator. The CTS is a rhombic-like vehicle, with two drivable and steerable wheels along its longitudinal axis, providing omni-directional capabilities. The rhombic kinematics correspond to four control variables, which are difficult to manage in manual mode operation. This paper proposes a Human Machine Interface (HMI) to remotely guide the vehicle in manual mode. The proposed solution is implemented using a HMI with an encoder connected to a micro-controller and an analog 2-axis joystick. Experimental results were obtained comparing the proposed solution with other controller devices in different scenarios and using a software platform that simulates the kinematics and dynamics of the vehicle. (authors)

  19. Process Management and Exception Handling in Multiprocessor Operating Systems Using Object-Oriented Design Techniques. Revised Sep. 1988

    Science.gov (United States)

    Russo, Vincent; Johnston, Gary; Campbell, Roy

    1988-01-01

    The programming of the interrupt handling mechanisms, process switching primitives, scheduling mechanism, and synchronization primitives of an operating system for a multiprocessor require both efficient code in order to support the needs of high- performance or real-time applications and careful organization to facilitate maintenance. Although many advantages have been claimed for object-oriented class hierarchical languages and their corresponding design methodologies, the application of these techniques to the design of the primitives within an operating system has not been widely demonstrated. To investigate the role of class hierarchical design in systems programming, the authors have constructed the Choices multiprocessor operating system architecture the C++ programming language. During the implementation, it was found that many operating system design concerns can be represented advantageously using a class hierarchical approach, including: the separation of mechanism and policy; the organization of an operating system into layers, each of which represents an abstract machine; and the notions of process and exception management. In this paper, we discuss an implementation of the low-level primitives of this system and outline the strategy by which we developed our solution.

  20. The effect of joystick handle size and gain at two levels of required precision on performance and physical load on crane operators

    NARCIS (Netherlands)

    Huysmans, M.A.; Looze, M.P. de; Hoozemans, M.J.M.; Beek, A.J. van der; Dieën, J.H. van

    2006-01-01

    The study was designed to determine the effect of joystick handle size and (display-control) gain at two levels of required task precision on performance and physical load on crane operators. Eight experienced crane operators performed a simulated crane operation task on a computer by use of a

  1. Remotely handled and remotely operated valve, particularly for the hot part of radioactive plants

    International Nuclear Information System (INIS)

    Radovan, G.; Sandling, M.J.; Davidson, J.W.; Blaseck, K.; Hoffmeister, L.; Westendorf, H.

    1988-01-01

    The valve consists of a valve whose valve housing is built into a pipeline. The wear parts of the valve to be replaced, such as the valve body and valve seat, are combined into a replacement part. The replacement part and a clamp act together so that the replacement part is interlocked with the valve housing in the closed operating position. The exchange can be made by undoing a single central screw. (DG) [de

  2. Step on the gas : Calgary-based firm increases efficiency of compressor fleets

    Energy Technology Data Exchange (ETDEWEB)

    Cope, G.

    2005-11-01

    Many operators are reluctant to run their compressors close to optimum efficiency due to concerns that a frozen well or other problems will push units over their limit, and gas limited areas also cause the machines to be run at partial capacity. This article suggested that the key to compressor optimization lies in the correct identification of deficiencies. Petroleum companies gather thousands of compressor data points every day, ranging from temperature and pressure to control valve position and compressor volume flow, but there is no easy way of analyzing the information. A software prototype called Production Equipment Performance Reporting (PEPR) is capable of disseminating log data and model compressor performance, as well as reporting results for an entire fleet. Raw operating data is gathered for the entire fleet and compressor utilization is ranked to show which compressors are being used efficiently and which ones are lagging. Data is processed from selected points per unit and then divided into key performance indicators (KPI), such as power utilization. To experienced operators, KPIs offer concise information and a range of changes they can make to improve the efficiency of their fleets. It was noted that Devon ran PEPR at one of its major gas fields, and was so satisfied with the results that it has now applied the system to the company's entire fleet. PEPR Inc. was formed in August 2004 to commercially market the production optimization software. In addition to optimizing compressor utilization, the software also handles other important functions, such as asset management, as well as generating downtime reports. While it only takes a day to install the software and a day to train, documenting basic data for each compressor can take several months for a large fleet. It was concluded that PEPR plans to configure its software to other production-related equipment. The system is capable of using operating parameters to calculate emissions instead of

  3. How Packaging Fleet Renewal Fits French CEA Programs

    International Nuclear Information System (INIS)

    Dumesnil, J.; Malvache, P.; Hugon, F.C.; Sollacaro, M.

    2006-01-01

    CEA's (French Atomic Energy Agency) packaging fleet is dedicated to transportation of test irradiated fuels, of research reactors fuels, of navy propulsion fuels, and of waste coming from and to nuclear plants or facilities. This fleet encompasses more than 30 types of casks ranging from 5 to 30 tons, with either recent designs or other dating back to the seventies. A study has been launched in order to perform a global analysis of the life expectancy of the existing CEA and COGEMA Logistics cask fleets with respect to a 2015 target, in order to anticipate its renewal, while limiting the number of type of cask. Key elements like periodical evolutions of design and transport regulations, lessons learnt of existing casks (design, approval and extensions, operational feedback, maintenance and dismantling) are taken into account in order to ensure compliance and availability of the fleet. Moreover, from design to cask delivery, including regulatory tests, safety analysis report/ CoC, and manufacturing, 3 to 5 years is needed. Therefore cask development should be taken into account earlier of invest and research's programs. The paper will address the current life expectancy study of CEA and COGEMA Logistics packaging fleet, based on lessons learnt and regulation evolution and on general R and D plans by user facilities. It will show how a comprehensive optimized fleet is made available to CEA and other customers. Such a fleet combines optimized investment and uses, thus entailing synergies for well-mastered costs of transports. (authors)

  4. Design of an overhead crane for the ITER NB cell remote handling maintenance operations

    Energy Technology Data Exchange (ETDEWEB)

    Taubmann, Gonzalo; Brochet, Laurent [IBERTEF A.I.E., Iberica de Tecnologia de Fusion, C/Magallanes 3, 28015 Madrid (Spain); Liniers, Macarena [Asociacion EURATOM-CIEMAT para la Fusion, Av. Complutense 22, 28040 Madrid (Spain)], E-mail: macarena.liniers@ciemat.es; Medrano, Mercedes; Sarasola, Xabier; Botija, Jose; Alonso, Javier [Asociacion EURATOM-CIEMAT para la Fusion, Av. Complutense 22, 28040 Madrid (Spain); Damiani, Carlo [FUSION FOR ENERGY, Josep Pla 2, Torres Diagonal Litoral Ed B3, 08019 Barcelona (Spain)

    2009-06-15

    In the neutral beam cell of ITER all the maintenance operations on the neutral beam components (BLC's) must be performed by an overhead crane of large payload capability (30-50 tonnes). A crane system is presented consisting of a monorail, a carriage, and a lifting mechanism. The monorail must give access to the BLC's in the beam line vessel, the front components connecting the NB vessel with the Tokamak, and a storage area at the north end of the NB cell. Rail switching points are required at the intersections between radial and toroidal branches. A translational switching mechanism is proposed. The crane carriage consists of two independent sub-carriages, each composed of four wheels. A set of four secondary wheels attached to the main carriage prevents the crane tilting due to the CoG misalignment of some loads. The elevation system proposed consists of an electromechanical crane of four independent drums and 50 tonnes payload. In parallel with the crane design, a logistics and space availability study has been carried out, leading to the detection of clearance or transport problems that could be taken into account in the final crane design.

  5. Design of an overhead crane for the ITER NB cell remote handling maintenance operations

    International Nuclear Information System (INIS)

    Taubmann, Gonzalo; Brochet, Laurent; Liniers, Macarena; Medrano, Mercedes; Sarasola, Xabier; Botija, Jose; Alonso, Javier; Damiani, Carlo

    2009-01-01

    In the neutral beam cell of ITER all the maintenance operations on the neutral beam components (BLC's) must be performed by an overhead crane of large payload capability (30-50 tonnes). A crane system is presented consisting of a monorail, a carriage, and a lifting mechanism. The monorail must give access to the BLC's in the beam line vessel, the front components connecting the NB vessel with the Tokamak, and a storage area at the north end of the NB cell. Rail switching points are required at the intersections between radial and toroidal branches. A translational switching mechanism is proposed. The crane carriage consists of two independent sub-carriages, each composed of four wheels. A set of four secondary wheels attached to the main carriage prevents the crane tilting due to the CoG misalignment of some loads. The elevation system proposed consists of an electromechanical crane of four independent drums and 50 tonnes payload. In parallel with the crane design, a logistics and space availability study has been carried out, leading to the detection of clearance or transport problems that could be taken into account in the final crane design.

  6. Ventilation and filtration techniques for handling aerosols produced by thermal cutting operations

    International Nuclear Information System (INIS)

    Bishop, A.

    1989-01-01

    This report describes the work done to characterize aerosols from thermal cutting operations and to develop suitable ventilation and filtration techniques. The work has been carried out under a research contract between the Windscale Laboratory and the Commission of the European Communities. The contract started in October 1984 and was completed in June 1988. The total cost of the work was UKL 132 000 of which 50% was funded by the Commission. This report has been compiled from the several progress reports submitted during the work period and details the main findings from the work programme. By working with colleagues from Commissariat a l'energie atomique, Saclay, France, additional useful data were collected. The bimodal size distribution of aerosols from oxypropane cutting was confirmed. Trials on various prefilters showed that the electrostatic precipitator (ESP) and the cartridge filter had excellent collection properties. From these trials the ESP was selected as the prefilter for the windscale advanced gas-cooled reactor (WAGR) decommissioning project. This work is presented in Appendix 1 to this report. Details are given of the proposals to modify the ESP to enable the safe removal of radioactive dust and contamined collector plates. Tests are described on aerosols generated by laser cutting and also trials on the ESP and high gradient magnetic separation prefilters. Finally, the measurement of filter burdens, aerosol concentrations and dust deposition rates from thermal cutting in a full-size ventilation rig are reported

  7. Remote handling techniques in decommissioning - A report of the NEA Co-operative Programme on Decommissioning (CPD) project

    International Nuclear Information System (INIS)

    Borchardt, Ralf; Denissen, Luc; Desbats, Philippe; Jeanjacques, Michel; Nokhamzon, Jean-Guy; Valentin, Pierre; Slater, Steve; Valencia, Luis; Wittenauer, Stephan; Yamauchi, Toyoaki; Burton, Bob

    2011-01-01

    The NEA Co-operative Programme for the Exchange of Scientific and Technical Information Concerning Nuclear Installation Decommissioning Projects (CPD) is a joint undertaking of a limited number of organisations actively executing on planning the decommissioning of nuclear facilities. The objective of the CPD is to acquire information from operational experience in decommissioning nuclear installations that is useful for future projects. Although part of the information exchanged within CPD is confidential in nature and is restricted to programme participants, experience of general interest gained under the programme's auspices is released for broader use. Such information is brought to the attention of all NEA members through regular reports to the NEA Radioactive Waste Management Committee (RWMC), as well as through published studies. This report describes generic results obtained by a CPD Task Group analysing the needs for remote technologies. The existing technologies able to meet these needs, the lessons learned and showing where improvements or further developments should be made in this domain. During the D and D process, the handling of highly radioactive materials, the deployment of tools and sensors and the dismantling of components built from many different materials can be a long, labor-intensive process that has the potential for high exposure rates, heat stress and injury to personnel. Mobile robotics systems provide solutions to these hazards. Such remote handling systems are required to perform tasks within budget and on schedule while justifying the expense by a saving in cumulative doses received by project personnel. To reach this goal, the following are additional factors that need to be evaluated when preparing a project: - System and peripherals must be operator-friendly. Ideally, the system must be designed to allow personnel currently available for the D and D project to become trained as operators within a reasonable time frame. - The

  8. Proposal for Managing Eco-efficient Operations Plant Dedicated to Waste Handling at Costa Rican Institute of Electricity

    Directory of Open Access Journals (Sweden)

    Annie Chinchilla

    2015-06-01

    Full Text Available In the present study, different eco-efficient specifications were established considered by Ingeniería y Construcciónor IC (Engineering and Construction, a business of the Costa Rican Institute of Electricity (ICE, in Spanish, at the time of developing an operational plant devoted to the handling of waste, in order to make rational use of resources and generate the lowest environmental impact. Initially a general diagnosis was conducted to learn about the current process of waste management in IC, as well as the identification and assessment of its aspects and environmental impacts. An ecoefficiency proposal program was subsequently prepared to be implemented once the ordinary, special and hazardous waste plant is operating. As part of this investigation, eco-efficient measures and technologies were also identified; this can be adopted by IC or any organization to improve its waste management. Finally, it is necessary that the Eco-efficient Management Program (PGE, in Spanish is organized, planned and systematized over time; in addition, the need to have an Ecoefficiency Management Committee arises, which will allow to implement it and measure it through a series of indicators.

  9. Design and operation of off-gas cleaning and ventilation systems in facilities handling low and intermediate level radioactive material

    International Nuclear Information System (INIS)

    1988-01-01

    The number of developing countries constructing new nuclear facilities is increasing. These facilities include the production and processing of radioisotopes, as well as all types of laboratories and installations, which handle radioactive material and deal with the treatment of radioactive wastes. Ventilation and air cleaning systems are a vital part of the general design of any nuclear facility. The combination of a well designed ventilation system with thorough cleaning of exhaust air is the main method of preventing radioactive contamination of the air in working areas and in the surrounding atmosphere. This report provides the latest information on the design and operation of off-gas cleaning and ventilation systems for designers and regulatory authorities in the control and operation of such systems in nuclear establishments. The report presents the findings of an Advisory Group Meeting held in Vienna from 1 to 5 December 1986 and attended by 12 experts from 11 Member States. Following this meeting, a revised report was prepared by the International Atomic Energy Agency Secretariat and three consultants, M.J. Kabat (Canada), W. Stotz (Federal Republic of Germany) and W.A. Fairhurst (United Kingdom). The final draft was commented upon and approved by the participants of the meeting. 69 refs, 37 figs, 12 tabs

  10. Evaluation of Multi Canister Overpack (MCO) Handling Machine Uplift Restraint for a Seismic Event During Repositioning Operations

    International Nuclear Information System (INIS)

    SWENSON, C.E.

    2000-01-01

    Insertion of the Multi-Canister Overpack (MCO) assemblies into the Canister Storage Building (CSB) storage tubes involves the use of the MCO Handling Machine (MHM). During MCO storage tube insertion operations, inadvertent movement of the MHM is prevented by engaging seismic restraints (''active restraints'') located adjacent to both the bridge and trolley wheels. During MHM repositioning operations, the active restraints are not engaged. When the active seismic restraints are not engaged, the only functioning seismic restraints are non-engageable (''passive'') wheel uplift restraints which function only if the wheel uplift is sufficient to close the nominal 0.5-inch gap at the uplift restraint interface. The MHM was designed and analyzed in accordance with ASME NOG-1-1995. The ALSTHOM seismic analysis reported seismic loads on the MHM uplift restraints and EDERER performed corresponding structural calculations to demonstrate structural adequacy of the seismic uplift restraint hardware. The ALSTHOM and EDERER calculations were performed for a parked MHM with the active seismic restraints engaged, resulting in uplift restraint loading only in the vertical direction. In support of development of the CSB Safety Analysis Report (SAR), an evaluation of the MHM seismic response was requested for the case where the active seismic restraints are not engaged. If a seismic event occurs during MHM repositioning operations, a moving contact at a seismic uplift restraint would introduce a friction load on the restraint in the direction of the movement. These potential horizontal friction loads on the uplift restraints were not included in the existing restraint hardware design calculations. One of the purposes of the current evaluation is to address the structural adequacy of the MHM seismic uplift restraints with the addition of the horizontal friction associated with MHM repositioning movements

  11. Fleet management for autonomous vehicles

    OpenAIRE

    Bsaybes, Sahar; Quilliot, Alain; Wagler, Annegret K.

    2016-01-01

    The VIPAFLEET project consists in developing models and algorithms for man- aging a fleet of Individual Public Autonomous Vehicles (VIPA). Hereby, we consider a fleet of cars distributed at specified stations in an industrial area to supply internal transportation, where the cars can be used in different modes of circulation (tram mode, elevator mode, taxi mode). One goal is to develop and implement suitable algorithms for each mode in order to satisfy all the requests under an economic point...

  12. Optimal Routing for Heterogeneous Fixed Fleets of Multicompartment Vehicles

    OpenAIRE

    Wang, Qian; Ji, Qingkai; Chiu, Chun-Hung

    2014-01-01

    We present a metaheuristic called the reactive guided tabu search (RGTS) to solve the heterogeneous fleet multicompartment vehicle routing problem (MCVRP), where a single vehicle is required for cotransporting multiple customer orders. MCVRP is commonly found in delivery of fashion apparel, petroleum distribution, food distribution, and waste collection. In searching the optimum solution of MCVRP, we need to handle a large amount of local optima in the solution spaces. To overcome this proble...

  13. Size and transportation capabilities of the existing U.S. cask fleet

    International Nuclear Information System (INIS)

    Danese, F.L.; Johnson, P.E.; Joy, D.S.

    1990-01-01

    This paper investigates the current spent nuclear fuel cask fleet capability in the United States. It assesses the degree to which the current fleet would be available, as a contingency, until proposed Office of Civilian Radioactive Waste Management casks become operational. A limited fleet of ten spent fuel transportation casks is found to be readily available for use in Federal waste management efforts over the next decade

  14. Selected solutions and design features from the design of remotely handled filters and the technology of remote filter handling. Previous operating experience with these components in the PASSAT facility

    International Nuclear Information System (INIS)

    Jannakos, K.; Lange, W.; Potgeter, G.; Furrer, J.; Wilhelm, J.G.

    1981-01-01

    In a prototype filter offgas cleaning system for reprocessing plants (PASSAT) built at the Karlsruhe Nuclear Research Center a fullscale filter cell with remotely handled filters for aerosol and iodine removal and the corresponding remote handling systems for exchange, bagging out, packaging and disposal of spent filter elements has been installed and run in trial operation since July 1978. The filters and the replacement techniques have been tested for the past two years or so and so far have always worked satisfactory over the test period involving some 150 replacement events. Neither wear nor corrosion phenomena were found in the filter housings and the replacement systems. The seals and clamping devices were selected so that during operation the prescribed leak rates of -3 Torr l/s were always maintained on the filter lid, the seat of the filter element and the cell lock. The total clamping loads for the filter element and the filter lid amount to approx. 20 kN. The force necessary to separate the filter element from the filter housing is approx. 3.5 kN. No ruptures of seals or gaskets were to be detected. The design of the filters and of the handling systems has been found satisfactorily in the cold test operation so far and can be recommended for use in nuclear facilities. In all experiments conducted until now PASSAT has worked without any failure. All operating data required in the specifications were met in the test period. The maximum pressure loss in the system with loaded filter elements amounts to some 3000 mm of water. After operation with iodine and NO/sub x/, plant components exposed to 100% relative humidity and condensate showed corrosion

  15. Optimization Model and Algorithm Design for Airline Fleet Planning in a Multiairline Competitive Environment

    Directory of Open Access Journals (Sweden)

    Yu Wang

    2015-01-01

    Full Text Available This paper presents a multiobjective mathematical programming model to optimize airline fleet size and structure with consideration of several critical factors severely affecting the fleet planning process. The main purpose of this paper is to reveal how multiairline competitive behaviors impact airline fleet size and structure by enhancing the existing route-based fleet planning model with consideration of the interaction between market share and flight frequency and also by applying the concept of equilibrium optimum to design heuristic algorithm for solving the model. Through case study and comparison, the heuristic algorithm is proved to be effective. By using the algorithm presented in this paper, the fleet operational profit is significantly increased compared with the use of the existing route-based model. Sensitivity analysis suggests that the fleet size and structure are more sensitive to the increase of fare price than to the increase of passenger demand.

  16. Waste Management's LNG Truck Fleet: Final Results

    Energy Technology Data Exchange (ETDEWEB)

    Chandler, K. [Battelle (US); Norton, P. [National Renewable Energy Laboratory (US); Clark, N. [West Virginia University (US)

    2001-01-25

    Waste Management, Inc., began operating a fleet of heavy-duty LNG refuse trucks at its Washington, Pennsylvania, facility. The objective of the project was to provide transportation professionals with quantitative, unbiased information on the cost, maintenance, operational, and emissions characteristics of LNG as one alternative to conventional diesel for heavy-duty trucking applications.

  17. Biodiesel Handling and Use Guide (Fifth Edition)

    Energy Technology Data Exchange (ETDEWEB)

    Alleman, T.L.; McCormick, R.L.; Christensen, E.D.; Fioroni, G.; Moriarty. K.; Yanowitz, J.

    2016-11-08

    This document is a guide for those who blend, distribute, and use biodiesel and biodiesel blends. It provides basic information on the proper and safe use of biodiesel and biodiesel blends in engines and boilers, and is intended to help fleets, individual users, blenders, distributors, and those involved in related activities understand procedures for handling and using biodiesel fuels.

  18. Effects of a potential drop of a shipping cask, a waste container, and a bare fuel assembly during waste-handling operations

    International Nuclear Information System (INIS)

    Wu, C.L.; Lee, J.; Lu, D.L.; Jardine, L.J.

    1991-12-01

    This study investigates the effects of potential drops of a typical shipping cask, waste container, and bare fuel assembly during waste-handling operations at the prospective Yucca Mountain Repository. The waste-handling process (one stage, no consolidation configuration) is examined to estimate the maximum loads imposed on typical casks and containers as they are handled by various pieces of equipment during waste-handling operations. Maximum potential drop heights for casks and containers are also evaluated for different operations. A nonlinear finite-element model is employed to represent a hybrid spent fuel container subject to drop heights of up to 30 ft onto a reinforced concrete floor. The impact stress, strain, and deformation are calculated, and compared to the failure criteria to estimate the limiting (maximum permissible) drop height for the waste container. A typical Westinghouse 17 x 17 PWR fuel assembly is analyzed by a simplified model to estimate the energy absorption by various parts of the fuel assembly during a 30 ft drop, and to determine the amount of kinetic energy in a fuel pin at impact. A nonlinear finite-element analysis of an individual fuel pin is also performed to estimate the amount of fuel pellet fracture due to impact. This work was completed on May 1990

  19. Fleet servicing facilities for testing and maintaining rail and truck radioactive waste transport systems

    International Nuclear Information System (INIS)

    Watson, C.D.; Hudson, B.J.; Preston, M.K.; Keith, D.A.; McCreery, P.N.; Knox, W.; Easterling, E.M.; Lamprey, A.S.; Wiedemann, G.

    1980-01-01

    This paper examines feasibility design concepts and feasibility studies of Fleet Servicing Facilities (FSF). Such facilities are intended to be used for routine servicing, preventive maintenance, and for performing requalification license compliance tests and inspections, minor repairs, and decontamination of both the transportation casks and their associated rail cars or tractor-trailers. None of the waste handling plants in the United States presently receiving radioactive wastes have an onsite FSF, nor is there an existing third party facility providing all of these services. This situation has caused the General Accounting Office to express concern regarding the quality of waste transport system maintenance once the transport system is placed into service. Thus a need is indicated for FSFs or their equivalent at various radioactive materials receiving sites. This paper also compares the respective capital costs and operating characteristics of the following three concepts of a spent fuel cask transportation FSF; integrated FSF, colocated FSF, and independent FSF

  20. Strategic vehicle fleet management - the composition problem

    Directory of Open Access Journals (Sweden)

    Adam Redmer

    2015-03-01

    Full Text Available Background: Fleets constitute the most important production means in transportation. Their appropriate management is crucial for all companies having transportation duties. The paper is the second one of a series of three papers that the author dedicates to the strategic vehicle fleet management topic. Material and methods: The paper discusses ways of building companies' fleets of vehicles. It means deciding on the number of vehicles in a fleet (the fleet sizing problem - FS and types of vehicles in a fleet (the fleet composition problem - FC. The essence of both problems lies in balancing transportation supply and demand taking into account different demand types to be fulfilled and different vehicle types that can be put into a fleet. Vehicles, which can substitute each other while fulfilling different demand types. In the paper an original mathematical model (an optimization method allowing for the FS/FC analysis is proposed. Results: An application of the proposed optimization method in a real-life decision situation (the case study within the Polish environment and the obtained solution are presented. The solution shows that there exist some best fitted (optimal fleet size / composition matching company's transportation requirements. An optimal fleet size / composition allows for a significantly higher fleet utilization (10-15% higher than any other, including random fleet structure. Moreover, any changes in the optimal fleet size / composition, even small ones, result in a lower utilization of vehicles (lower by a few percent. Conclusions: The presented in this paper analysis, on the one hand, is consistent with a widespread opinion that the number of vehicle types in a fleet should be limited. In the other words it means that the versatility / interchangeability of vehicles is very important. On the other hand, the analysis proves that even small changes in a fleet size / fleet composition can result in an important changes of the fleet

  1. Anomaly Detection in a Fleet of Systems

    Data.gov (United States)

    National Aeronautics and Space Administration — A fleet is a group of systems (e.g., cars, aircraft) that are designed and manufactured the same way and are intended to be used the same way. For example, a fleet...

  2. National Clean Fleets Partnership (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2014-01-01

    Clean Cities' National Clean Fleets Partnership establishes strategic alliances with large fleets to help them explore and adopt alternative fuels and fuel economy measures to cut petroleum use. The initiative leverages the strength of nearly 100 Clean Cities coalitions, nearly 18,000 stakeholders, and more than 20 years of experience. It provides fleets with top-level support, technical assistance, robust tools and resources, and public acknowledgement to help meet and celebrate fleets' petroleum-use reductions.

  3. Interfacing the existing cask fleet with the MRS

    International Nuclear Information System (INIS)

    Doman, J.W.; Hahn, R.E.

    1992-01-01

    This paper reports that the Department of Energy (DOE) is considering the possibility of using the existing fleet of casks to achieve spent fuel receipt at the Monitored Retrievable Storage (MRS) facility. The existing cask fleet includes the NLI-1/2, the NAC-LWT, the TN-8 (and TN-8L), the TN-9, and the IF-300 casks. Other casks may be available, but their status is not certain. Use of the existing cask fleet at the MRS places additional design requirements on the system, and specifically affects the cask-to-MRS interface. The decision to use the existing cask fleet also places additional demands on training needs and operator certification, and the configuration management system. Some existing cask designs may not be able to mate with a bottom opening hot cell MRS. Use of the existing cask fleet also greatly increases the number of shipments that must be received, to the point that a facility larger than originally envisioned may be required

  4. Condition Monitoring of the SSE Generation Fleet

    Science.gov (United States)

    Twiddle, J.; Muthuraman, S.; Connolly, N.

    2012-05-01

    SSE (previously known as Scottish and Southern Energy) operates a diverse portfolio of generation plant, including coal, gas and renewable plant with a total generation capacity of 11,375MW (Sept 2011). In recent years a group of specialists dedicated to providing condition monitoring services has been established at the Equipment Performance Centre (EPC) based at Knottingley, West Yorkshire. We aim to illustrate the role of the EPC and the methods used for monitoring the generation fleet with the objective of maintaining asset integrity, reducing risk of plant failure and unplanned outages and describe the challenges which have been overcome in establishing the EPC. This paper describes methods including vibration and process data analysis, model-based techniques and on-site testing used for monitoring of generation plant, including gas turbines, steam turbines, generators and steam raising plant. These condition monitoring processes utilise available data, adding value to the business, by bringing services in-house and capturing knowledge of plant operation for the benefit of the whole fleet.

  5. The use of virtual reality and intelligent database systems for procedure planning, visualisation, and real-time component tracking in remote handling operations

    International Nuclear Information System (INIS)

    Robbins, Edward; Sanders, Stephen; Williams, Adrian; Allan, Peter

    2009-01-01

    The organisation of remote handling (RH) operations in fusion environments is increasingly critical as the number of tasks, components and tooling that RH operations teams must deal with inexorably rises. During the recent JET EP1 RH shutdown the existing virtual reality (VR) and procedural database systems proved essential for visualisation and tracking of operations, particularly due to the increasing complexity of remote tasks. A new task planning system for RH operations is in development, and is expected to be ready for use during the next major shutdown, planned for 2009. The system will make use of information available from the remote operations procedures, the RH equipment human-machine interfaces, the on-line RH equipment control systems and also the virtual reality (VR) system to establish a complete database for the location of plant items and RH equipment as RH operations progress. It is intended that the system be used during both preparation and implementation of shutdowns. In the preparations phase the system can be used to validate procedures and overall logistics by allowing an operator to increment through each operation step and to use the VR system to visualise the location and status of all components, manipulators and RH tools. During task development the RH operations engineers can plan and visualise movement of components and tooling to examine handling concepts and establish storage requirements. In the implementation of operations the daily work schedules information will be integrated with the RH operations procedures tracking records to enable the VR system to provide a visual representation of the status of remote operations in real time. Monitoring of the usage history of items will allow estimates of radiation dosage and contaminant exposure to be made. This paper describes the overall aims, structure and use of the system, discusses its application to JET and also considers potential future developments.

  6. Nuclear fuel handling apparatus

    International Nuclear Information System (INIS)

    Andrea, C.; Dupen, C.F.G.; Noyes, R.C.

    1977-01-01

    A fuel handling machine for a liquid metal cooled nuclear reactor in which a retractable handling tube and gripper are lowered into the reactor to withdraw a spent fuel assembly into the handling tube. The handling tube containing the fuel assembly immersed in liquid sodium is then withdrawn completely from the reactor into the outer barrel of the handling machine. The machine is then used to transport the spent fuel assembly directly to a remotely located decay tank. The fuel handling machine includes a decay heat removal system which continuously removes heat from the interior of the handling tube and which is capable of operating at its full cooling capacity at all times. The handling tube is supported in the machine from an articulated joint which enables it to readily align itself with the correct position in the core. An emergency sodium supply is carried directly by the machine to provide make up in the event of a loss of sodium from the handling tube during transport to the decay tank. 5 claims, 32 drawing figures

  7. European Model Code of safe practice in the storage and handling of petroleum products. Part I. Operations

    Energy Technology Data Exchange (ETDEWEB)

    1973-01-01

    This safe practice code was prepared by a working group consisting of experts from 10 Western European countries. It consists of short guidelines and technical advice on general precautions, injuries and medical services, permits to work, fire prevention and fighting, jetties, pipework, storage tanks, static electricity, electrical equipment, road vehicles, tank cars, handling of bitumen products, liquefied petroleum gases, packed products and training of personnel. The code is supplemented by 10 appendices, including a suggested syllabus for a 2-day course on fire prevention and emergency action for managers of oil installations.

  8. Long Term Hydrogen Vehicle Fleet Operational Assessment

    Science.gov (United States)

    2011-03-21

    world settings. The implementation and qualification of these technologies addresses national objectives and improves the state of the art to advance...Gasoline Electric Sport Utility Vehicles (SUV). Figure 1 shows one of the H2ICE vehicles. The H2ICE vehicles have a full hybrid system capable of...Hickam NAC National Automotive Center PACOM Pacific Command SLI Starting, Lighting, and Ignition SUV Sport Utility Vehicle TARDEC Tank Automotive Research Development, and Engineering Center

  9. Fleet management for vehicle sharing operations.

    Science.gov (United States)

    2010-05-01

    Transit, touted as a solution to urban mobility problems, cannot match the addictive flexibility of : the automobile. 86.5% of all trips in the U.S. are in personal vehicles (USDOT 2001). A more recent approach to reduce : automobile ownership is thr...

  10. Modelling the spatial behaviour of a tropical tuna purse seine fleet.

    Directory of Open Access Journals (Sweden)

    Tim K Davies

    Full Text Available Industrial tuna fisheries operate in the Indian, Atlantic and Pacific Oceans, but concerns over sustainability and environmental impacts of these fisheries have resulted in increased scrutiny of how they are managed. An important but often overlooked factor in the success or failure of tuna fisheries management is the behaviour of fishers and fishing fleets. Uncertainty in how a fishing fleet will respond to management or other influences can be reduced by anticipating fleet behaviour, although to date there has been little research directed at understanding and anticipating the human dimension of tuna fisheries. The aim of this study was to address gaps in knowledge of the behaviour of tuna fleets, using the Indian Ocean tropical tuna purse seine fishery as a case study. We use statistical modelling to examine the factors that influence the spatial behaviour of the purse seine fleet at broad spatiotemporal scales. This analysis reveals very high consistency between years in the use of seasonal fishing grounds by the fleet, as well as a forcing influence of biophysical ocean conditions on the distribution of fishing effort. These findings suggest strong inertia in the spatial behaviour of the fleet, which has important implications for predicting the response of the fleet to natural events or management measures (e.g., spatial closures.

  11. Strategic vehicle fleet management - the replacement problem

    Directory of Open Access Journals (Sweden)

    Adam Redmer

    2016-03-01

    Full Text Available Background: Fleets constitute the most important production means in transportation. Their appropriate management is crucial for all companies having transportation duties. The paper is the third one of a series of three papers that the author dedicates to the strategic vehicle fleet management topic. Material and methods: The paper discusses ways of building replacement strategies for companies' fleets of vehicles. It means deciding for how long to exploit particular vehicles in a fleet (the fleet replacement problem - FR. The essence of this problem lies in the minimization of vehicle / fleet exploitation costs by balancing ownership and utilization costs and taking into account budget limitations. In the paper an original mathematical model (an optimization method allowing for the FR analysis is proposed. Results: An application of the proposed optimization method in a real-life decision situation (the case study within the Polish environment and the obtained solution are presented. The solution shows that there exist optimal exploitation periods of particular vehicles in a fleet. However, combination of them gives a replacement plan for an entire fleet violating budget constraints. But it is possible to adjust individual age to replacement of particular vehicles to fulfill budget constraints without losing economical optimality of a developed replacement plan for an entire fleet. Conclusions: The paper is the last one of a series of three papers that the author dedicated to the strategic vehicle fleet management topic including the following managerial decision problems: MAKE-or-BUY, sizing / composition and replacement.

  12. Maritime Security Fleet: Factors to Consider before Deciding to Select Participants Competitively

    National Research Council Canada - National Science Library

    1997-01-01

    The Maritime Security Act established the Maritime Security Fleet (MSF) program, authorizing MARAD to enter into agreements with maritime shipping companies to provide DOD access to commercial vessels operating under U.S...

  13. Idle reduction assessment for the New York State Department of Transportation region 4 fleet.

    Science.gov (United States)

    2015-03-01

    Energetics Incorporated conducted a study to evaluate the operational, economic, and environmental impacts of advanced technologies to reduce idling in : the New York State Department of Transportation (NYSDOT) Region 4 fleet without compromising fun...

  14. Claims Handling Co-operation between Nuclear Insurance Pools in a Case of Transboundary Damage - Multilateral and Bilateral Agreements in Progress

    International Nuclear Information System (INIS)

    Zaruba, P.

    2008-01-01

    The paper is a short progress report on matters concerning the core reason for insurance of nuclear third party liability - registration, handling, organizing and settling of claims in case of a major nuclear incident, underlining claims handling co-operation between national nuclear insurance pools when damage to health or property becomes international. The contents of this paper is in close relation to information provided on this subject during the 6th International Conference in 2006. Commercial insurance companies have gained extensive experience with handling large scale claims (e.g. after floods and other natural disasters) and are capable in gathering and organizing a high number of professional loss surveyors and adjusters in a very short period of time. In case of nuclear insurance pools co-operation between members (commercial insurance companies) is an added value and can be used practically all over the country bringing into action the network of branches and offices of all the pool members. This advantage is also used in case of cross border claims when it is necessary to gather information and claims advises from a large number of subjects and from many countries, sometimes very far apart. The international network of nuclear insurance pools is an ideal tool for this task and can be mobilized practically at once. Operators of nuclear installations, especially nuclear power plants, do not have the possibility to put aside hundreds of workers to handle claims and are also usually not sufficiently equipped with the necessary know-how. The same goes for governments and government agencies which in many countries guarantee the payments of claims to victims. National nuclear insurance pools are on the other hand well equipped for this task which usually has to be in place for many years after a nuclear incident. Multilateral and bilateral agreements between national nuclear insurance pools and other institutions should be prepared and signed before any

  15. TRANSPORT/HANDLING REQUESTS

    CERN Multimedia

    Groupe ST/HM

    2002-01-01

    A new EDH document entitled 'Transport/Handling Request' will be in operation as of Monday, 11th February 2002, when the corresponding icon will be accessible from the EDH desktop, together with the application instructions. This EDH form will replace the paper-format transport/handling request form for all activities involving the transport of equipment and materials. However, the paper form will still be used for all vehicle-hire requests. The introduction of the EDH transport/handling request form is accompanied by the establishment of the following time limits for the various services concerned: 24 hours for the removal of office items, 48 hours for the transport of heavy items (of up to 6 metric tons and of standard road width), 5 working days for a crane operation, extra-heavy transport operation or complete removal, 5 working days for all transport operations relating to LHC installation. ST/HM Group, Logistics Section Tel: 72672 - 72202

  16. Commercial vehicle fleet management and information systems. Technical memorandum 3 : ITS fleet management technology resource guide

    Science.gov (United States)

    1997-05-01

    In todays increasingly competitive economic environment, effective management of commercial vehicle fleets is important for all types of carriers and for the trucking industry as a whole. To meet fleet management needs, carriers increasingly are t...

  17. The influence of typical ways of operating and air-handling unit on the sensory pollution load from used bag filters

    DEFF Research Database (Denmark)

    Mysen, M.; Clausen, Geo; Bekö, Gabriel

    2003-01-01

    An experiment was performed to determine whether the sensory pollution emitted from a bag filter that had been used for 3 months in a suburban area in Denmark was influenced by different ways of operating the air-handling unit (AHU). Samples of the used filter were pre-conditioned to simulate thr...... the airflow outside working hours would significantly increase the sensory pollution emitted by a used bag filter immediately after the AHU is turned on, in comparison with continuous airflow through the AHU (P...... operating conditions: 1) switched off overnight; 2) airflow reduced to 10% overnight; and 3) continuous 100% operation. Outside air passed through the samples and the acceptability of the air after the filter was assessed by a panel of subjects. The results indicate that turning off the AHU or reducing...

  18. Aviation safety: hazardous materials handling. Hearing before a Subcommittee of the Committee on Government Operations, House of Representatives, Ninety-Sixth Congress, Second Session

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    Statements concerning the safety of air transport of hazardous and radioactive materials presented before a Subcommittee of the Committee on Government Operations of the House of Representatives are presented. Statements of various personnel involved in air transport including the Air Line Pilots Association and the US Postal Service and the Professional Air Traffic Controllers Organization are presented for the record. Also included are appendices concerning the Minneapolis-Saint Paul Metropolitan Airport Commission Ordinance number 44, Air Line Pilots Association procedures for the safe transportation of passengers, and a personal statement concerning the handling procedures of radioactive materials by the US Postal Service

  19. Fleet Aviation Maintenance Organic Support (FAMOS) Laboratory

    Data.gov (United States)

    Federal Laboratory Consortium — Purpose:The Fleet Aviation Maintenance Organic Support (FAMOS) Laboratory at the Naval Air Warfare Center Aircraft Division, Lakehurst, NJ provides rapid engineering...

  20. A prototype expert system for fault analysis, alarm handling and operator advising in a PWR nuclear power plant

    International Nuclear Information System (INIS)

    Gondran, M.; Ancelin, J.; Hery, J.F.; Laleuf, J.C.; Legaud, P.

    1986-01-01

    This paper successively describes the methodological advantages of the expert-systems approach and then two major applications of it that are under development in Electricite de France: assistance in alarms and operational management, and computer-assisted reliability. Topics considered include man-machine systems, human factors engineering, reactor operation, artificial intelligence, and decision making

  1. New transport and handling contract

    CERN Multimedia

    SC Department

    2008-01-01

    A new transport and handling contract entered into force on 1.10.2008. As with the previous contract, the user interface is the internal transport/handling request form on EDH: https://edh.cern.ch/Document/TransportRequest/ To ensure that you receive the best possible service, we invite you to complete the various fields as accurately as possible and to include a mobile telephone number on which we can reach you. You can follow the progress of your request (schedule, completion) in the EDH request routing information. We remind you that the following deadlines apply: 48 hours for the transport of heavy goods (up to 8 tonnes) or simple handling operations 5 working days for crane operations, transport of extra-heavy goods, complex handling operations and combined transport and handling operations in the tunnel. For all enquiries, the number to contact remains unchanged: 72202. Heavy Handling Section TS-HE-HH 72672 - 160319

  2. The Japanese Society of Pathology Guidelines on the handling of pathological tissue samples for genomic research: Standard operating procedures based on empirical analyses.

    Science.gov (United States)

    Kanai, Yae; Nishihara, Hiroshi; Miyagi, Yohei; Tsuruyama, Tatsuhiro; Taguchi, Kenichi; Katoh, Hiroto; Takeuchi, Tomoyo; Gotoh, Masahiro; Kuramoto, Junko; Arai, Eri; Ojima, Hidenori; Shibuya, Ayako; Yoshida, Teruhiko; Akahane, Toshiaki; Kasajima, Rika; Morita, Kei-Ichi; Inazawa, Johji; Sasaki, Takeshi; Fukayama, Masashi; Oda, Yoshinao

    2018-02-01

    Genome research using appropriately collected pathological tissue samples is expected to yield breakthroughs in the development of biomarkers and identification of therapeutic targets for diseases such as cancers. In this connection, the Japanese Society of Pathology (JSP) has developed "The JSP Guidelines on the Handling of Pathological Tissue Samples for Genomic Research" based on an abundance of data from empirical analyses of tissue samples collected and stored under various conditions. Tissue samples should be collected from appropriate sites within surgically resected specimens, without disturbing the features on which pathological diagnosis is based, while avoiding bleeding or necrotic foci. They should be collected as soon as possible after resection: at the latest within about 3 h of storage at 4°C. Preferably, snap-frozen samples should be stored in liquid nitrogen (about -180°C) until use. When intending to use genomic DNA extracted from formalin-fixed paraffin-embedded tissue, 10% neutral buffered formalin should be used. Insufficient fixation and overfixation must both be avoided. We hope that pathologists, clinicians, clinical laboratory technicians and biobank operators will come to master the handling of pathological tissue samples based on the standard operating procedures in these Guidelines to yield results that will assist in the realization of genomic medicine. © 2018 The Authors. Pathology International published by Japanese Society of Pathology and John Wiley & Sons Australia, Ltd.

  3. State and Alternative Fuel Provider Fleets - Fleet Compliance Annual Report: Model Year 2015, Fiscal Year 2016

    Energy Technology Data Exchange (ETDEWEB)

    2016-12-01

    The U.S. Department of Energy (DOE) regulates covered state government and alternative fuel provider fleets, pursuant to the Energy Policy Act of 1992 (EPAct), as amended. Covered fleets may meet their EPAct requirements through one of two compliance methods: Standard Compliance or Alternative Compliance. For model year (MY) 2015, the compliance rate with this program for the more than 3011 reporting fleets was 100%. More than 294 fleets used Standard Compliance and exceeded their aggregate MY 2015 acquisition requirements by 8% through acquisitions alone. The seven covered fleets that used Alternative Compliance exceeded their aggregate MY 2015 petroleum use reduction requirements by 46%.

  4. NATIONAL FLEET DEVELOPMENT IN THE INNOVATIVE ECONOMY. CASE STUDY OF THE GREEK FLEET

    Directory of Open Access Journals (Sweden)

    Marek Grzybowski

    2016-06-01

    Full Text Available In the article the development of the Greek fleet in the period of last ten years was discussed. The Greek fleet is an example of accommodating itself to the requirements of the global and innovative economy. Greek shipowners are developing their fleets through the consolidation and replacing older ships with new generation vessels. They are invest-ing into ships adapted for new markets, including LNG maritime transport market. As a result of it Greece became a market leader in maritime transport sector and their fleet a biggest and youngest fleet of world in 2016.

  5. Vehicle attributes constraining present electric car applicability in the fleet market

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, J R

    1979-12-01

    One strategy for reducing petroleum imports is to use electric cars in place of conventional vehicles. This paper examines obstacles which electric cars are likely to encounter in attempting to penetrate a key segment of the passenger car market, namely, the fleet market. A fleet is here defined as a group of cars operated by a corporation or a government agency. The primary data source is a questionnaire that was distributed to fleet operators by the Bobit Publishing Company in the summer of 1977. Six sectors of the fleet market were sampled: police, state and local government, utilities, taxi, rental, and business. The questionnaire was specifically designed to uncover factors limiting market penetration of unconventional vehicles, although no attempt was made to determine price elasticities. Emphasis is on vehicle attributes that are readily quantifiable and relatively projectable, including seating capacity, range, battery recharging characteristics, availability of power options, and ability to use interstate highways.

  6. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Francfort, Jim [Idaho National Laboratory (INL), Idaho Falls, ID (United States)

    2015-06-01

    Collect and evaluate data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization Study. The Advanced Vehicle Testing Activity study seeks to collect and evaluate data to validate the utilization of advanced plug-in electric vehicle (PEV) transportation. This report summarizes the fleets studied to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.

  7. CleanFleet. Final report: Volume 5, employee attitude assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The experiences of couriers, operations managers, vehicle handlers (refuelers), and mechanics who drove and/or worked with alternative fuel vehicles, and the attitudes and perceptions of people with these experiences, are examined. Five alternative fuels studied in the CleanFleet project are considers& compressed natural gas, propane gas, California Phase 2 reformulated gasoline, M-85, and electricity. The three major areas of interest include comparative analysis of issues such as health, safety and vehicle performance, business issues encompassing several facets of station operations, and personal commentary and opinions about the CleanFleet project and the alterative fuels. Results of the employee attitude assessment are presented as both statistical and qualitative analysis.

  8. Network planning for scheduling operations in air cargo handling : a tool in medium term goods flow control

    NARCIS (Netherlands)

    Verwijmeren, M.A.A.P.; Tilanus, C.B.

    1993-01-01

    In the hub of a hub-and-spokes network for airfreight transportation, the main part of the incoming and outgoing goodsflow is in special loading units for airfreight. These loading units are metal pallets and containers up to eighteen cubic meters in size. The key part of operations in the hub is

  9. 29 CFR 1917.71 - Terminals handling intermodal containers or roll-on roll-off operations.

    Science.gov (United States)

    2010-07-01

    ... means high visibility/retro-reflective materials which are intended to make the user clearly visible by... unlocks manually (manual twistlocks or latchlocks are not permitted); (ii) Is designed to indicate whether... or weaknesses and be able to assess their importance in relation to the safety of VTL operations. (ii...

  10. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Energy Technology Data Exchange (ETDEWEB)

    Stottler, Gary

    2012-02-08

    General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

  11. Remote handling at LAMPF

    International Nuclear Information System (INIS)

    Grisham, D.L.; Lambert, J.E.

    1983-01-01

    Experimental area A at the Clinton P. Anderson Meson Physics Facility (LAMPF) encompasses a large area. Presently there are four experimental target cells along the main proton beam line that have become highly radioactive, thus dictating that all maintenance be performed remotely. The Monitor remote handling system was developed to perform in situ maintenance at any location within area A. Due to the complexity of experimental systems and confined space, conventional remote handling methods based upon hot cell and/or hot bay concepts are not workable. Contrary to conventional remote handling which require special tooling for each specifically planned operation, the Monitor concept is aimed at providing a totally flexible system capable of remotely performing general mechanical and electrical maintenance operations using standard tools. The Monitor system is described

  12. Management of transport and handling contracts

    CERN Document Server

    Rühl, I

    2004-01-01

    This paper shall outline the content, application and management strategies for the various contracts related to transport and handling activities. In total, the two sections Logistics and Handling Maintenance are in charge of 27 (!) contracts ranging from small supply contracts to big industrial support contracts. The activities as well as the contracts can generally be divided into four main topics "Vehicle Fleet Management"; "Supply, Installation and Commissioning of Lifting and Hoisting Equipment"; "Equipment Maintenance" and "Industrial Support for Transport and Handling". Each activity and contract requires different approaches and permanent adaptation to the often changing CERN's requirements. In particular, the management and the difficulties experienced with the contracts E072 "Maintenance of lifting and hoisting equipment", F420 "Supply of seven overhead traveling cranes for LHC" and S090/S103 "Industrial support for transport and handling" will be explained in detail.

  13. Drycon dry ash conveyor: dry bottom ash handling system with reduced operating costs and improved plant efficiency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The Drycon dry bottom ash extraction system is designed to remove bottom ash beneath the furnace, cooling it without any need of water. Fresh air in countercurrent flow to the ash is used for the ash cooling. Data presented show how savings of time and costs can be achieved with this system and how a boiler efficiency can be increased using this technology. Considerable advantages in the reliability of operation with new improvements of the design are described. 7 figs.

  14. Fleet renewal: An approach to achieve sustainable road transport

    Directory of Open Access Journals (Sweden)

    Manojlović Aleksandar V.

    2011-01-01

    Full Text Available With more stringent requirements for efficient utilization of energy resources within the transport industry a need for implementation of sustainable development principles has appeared. Such action will be one of competitive advantages in the future. This is especially confirmed within the road transport sector. A methodology implemented in public procurement procedures for fleet renewal regarding the calculation of road vehicles’ operational lifecycle costs has been analyzed in detail in this paper. Afore mentioned calculation comprises the costs for: vehicle ownership, energy, carbon dioxide and pollutants emissions. Implementation of this methodology allows making the choice of energy efficient vehicles and vehicles with notable positive environmental effects. The objective of the research is to assess the influence of specific parameters of vehicle operational lifecycle costs, especially energy costs and estimated vehicle energy consumption, on vehicle choice in the procurement procedure. The case of urban bus fleet in Serbia was analyzed. Their operational lifecycle costs were calculated and differently powered vehicles were assessed. Energy consumption input values were defined. It was proved that defined fleet renewal scenarios could influence unquestionable decrease in energy consumption.

  15. Safety evaluation report of the Waste Isolation Pilot Plant safety analysis report: Contact-handled transuranic waste disposal operations

    International Nuclear Information System (INIS)

    1997-02-01

    DOE 5480.23, Nuclear Safety Analysis Reports, requires that the US Department of Energy conduct an independent, defensible, review in order to approve a Safety Analysis Report (SAR). That review and the SAR approval basis is documented in this formal Safety Evaluation Report (SER). This SER documents the DOE's review of the Waste Isolation Pilot Plant SAR and provides the Carlsbad Area Office Manager, the WIPP SAR approval authority, with the basis for approving the safety document. It concludes that the safety basis documented in the WIPP SAR is comprehensive, correct, and commensurate with hazards associated with planned waste disposal operations

  16. Robotic Materials Handling in Space: Mechanical Design of the Robot Operated Materials Processing System HitchHiker Experiment

    Science.gov (United States)

    Voellmer, George

    1997-01-01

    The Goddard Space Flight Center has developed the Robot Operated Materials Processing System (ROMPS) that flew aboard STS-64 in September, 1994. The ROMPS robot transported pallets containing wafers of different materials from their storage racks to a furnace for thermal processing. A system of tapered guides and compliant springs was designed to deal with the potential misalignments. The robot and all the sample pallets were locked down for launch and landing. The design of the passive lockdown system, and the interplay between it and the alignment system are presented.

  17. Developments of STR project in the scope of teleoperation handling robotic for the operation in Spanish nuclear facilities

    International Nuclear Information System (INIS)

    Bielza, M.; Gomez Santamaria, J.; Izquierdo, J.A.; Martinez, S.; Linares, F.; Avello, A.; Gago, M.J.

    1998-01-01

    The main objective of the Teleoperated Robotic Systems project (SRT) is the development of teleoperated robotic systems for use in the inspection, surveillance and maintenance operations in nuclear and radioactive installations. These systems make possible the reduction of the individual and collective doses of the workers that undertake these operations, as well as an increase of plant availability as it is possible to carry out specific tasks of inspection and surveillance in high radiation dose areas without having to reduce the power of the installation. This project started in 1995, deciding to priorize the inspection equipment in a first phase. When this work were advanced, the development of the manipulation activities was carried out to being consider the nuclear installations needs. As a result of this work, the manipulation requirements were elaborated in order to prepare the beginning technical specifications to design the equipment s. These developments are based on a fixed manipulator which is located closed to the equipment that we want to repair, and an arm manipulator which moves by caterpillars, it is easier to control than others; and the navigation system which allows the robot self-locating in the complex area. In this paper the conclusions about the manipulation requirements are described, as well as the state of the manipulation prototype. (Author)

  18. Fleet-Car Market PENetration Simulator: CPEN user's guide

    Energy Technology Data Exchange (ETDEWEB)

    Weil, R.

    1980-08-01

    The purpose of this manual is to assist prospective users in the understanding and execution of Fleet-Car Market PENetration Simulator (CPEN). CPEN is an interactive FORTRAN program whose purpose is to produce estimates of fleet-market-penetration rates of alternative passenger cars that can be described in terms of specific physical and economic attributes. The data were derived from questionnaires distributed to fleet operators affiliated with National Association of Fleet Administrators (NAFA). Besides the NAFA data, CPEN uses 48 variables that are interactively inserted. Complete data-input descriptions are included in the manual along with algorithm and application flowcharts. Examples of complete successful simulator runs are included for alternative program paths. A listing of the computer program and a glossary for CPEN are included.

  19. Aircraft Anomaly Detection Using Performance Models Trained on Fleet Data

    Science.gov (United States)

    Gorinevsky, Dimitry; Matthews, Bryan L.; Martin, Rodney

    2012-01-01

    This paper describes an application of data mining technology called Distributed Fleet Monitoring (DFM) to Flight Operational Quality Assurance (FOQA) data collected from a fleet of commercial aircraft. DFM transforms the data into aircraft performance models, flight-to-flight trends, and individual flight anomalies by fitting a multi-level regression model to the data. The model represents aircraft flight performance and takes into account fixed effects: flight-to-flight and vehicle-to-vehicle variability. The regression parameters include aerodynamic coefficients and other aircraft performance parameters that are usually identified by aircraft manufacturers in flight tests. Using DFM, the multi-terabyte FOQA data set with half-million flights was processed in a few hours. The anomalies found include wrong values of competed variables, (e.g., aircraft weight), sensor failures and baises, failures, biases, and trends in flight actuators. These anomalies were missed by the existing airline monitoring of FOQA data exceedances.

  20. Standard operating procedures for pre-analytical handling of blood and urine for metabolomic studies and biobanks.

    Science.gov (United States)

    Bernini, Patrizia; Bertini, Ivano; Luchinat, Claudio; Nincheri, Paola; Staderini, Samuele; Turano, Paola

    2011-04-01

    (1)H NMR metabolic profiling of urine, serum and plasma has been used to monitor the impact of the pre-analytical steps on the sample quality and stability in order to propose standard operating procedures (SOPs) for deposition in biobanks. We analyzed the quality of serum and plasma samples as a function of the elapsed time (t = 0-4 h) between blood collection and processing and of the time from processing to freezing (up to 24 h). The stability of the urine metabolic profile over time (up to 24 h) at various storage temperatures was monitored as a function of the different pre-analytical treatments like pre-storage centrifugation, filtration, and addition of the bacteriostatic preservative sodium azide. Appreciable changes in the profiles, reflecting changes in the concentration of a number of metabolites, were detected and discussed in terms of chemical and enzymatic reactions for both blood and urine samples. Appropriate procedures for blood derivatives collection and urine preservation/storage that allow maintaining as much as possible the original metabolic profile of the fresh samples emerge, and are proposed as SOPs for biobanking.

  1. Standard operating procedures for pre-analytical handling of blood and urine for metabolomic studies and biobanks

    International Nuclear Information System (INIS)

    Bernini, Patrizia; Bertini, Ivano; Luchinat, Claudio; Nincheri, Paola; Staderini, Samuele; Turano, Paola

    2011-01-01

    1 H NMR metabolic profiling of urine, serum and plasma has been used to monitor the impact of the pre-analytical steps on the sample quality and stability in order to propose standard operating procedures (SOPs) for deposition in biobanks. We analyzed the quality of serum and plasma samples as a function of the elapsed time (t = 0−4 h) between blood collection and processing and of the time from processing to freezing (up to 24 h). The stability of the urine metabolic profile over time (up to 24 h) at various storage temperatures was monitored as a function of the different pre-analytical treatments like pre-storage centrifugation, filtration, and addition of the bacteriostatic preservative sodium azide. Appreciable changes in the profiles, reflecting changes in the concentration of a number of metabolites, were detected and discussed in terms of chemical and enzymatic reactions for both blood and urine samples. Appropriate procedures for blood derivatives collection and urine preservation/storage that allow maintaining as much as possible the original metabolic profile of the fresh samples emerge, and are proposed as SOPs for biobanking.

  2. Standard operating procedures for pre-analytical handling of blood and urine for metabolomic studies and biobanks

    Energy Technology Data Exchange (ETDEWEB)

    Bernini, Patrizia; Bertini, Ivano, E-mail: bertini@cerm.unifi.it; Luchinat, Claudio [University of Florence, Magnetic Resonance Center (CERM) (Italy); Nincheri, Paola; Staderini, Samuele [FiorGen Foundation (Italy); Turano, Paola [University of Florence, Magnetic Resonance Center (CERM) (Italy)

    2011-04-15

    {sup 1}H NMR metabolic profiling of urine, serum and plasma has been used to monitor the impact of the pre-analytical steps on the sample quality and stability in order to propose standard operating procedures (SOPs) for deposition in biobanks. We analyzed the quality of serum and plasma samples as a function of the elapsed time (t = 0-4 h) between blood collection and processing and of the time from processing to freezing (up to 24 h). The stability of the urine metabolic profile over time (up to 24 h) at various storage temperatures was monitored as a function of the different pre-analytical treatments like pre-storage centrifugation, filtration, and addition of the bacteriostatic preservative sodium azide. Appreciable changes in the profiles, reflecting changes in the concentration of a number of metabolites, were detected and discussed in terms of chemical and enzymatic reactions for both blood and urine samples. Appropriate procedures for blood derivatives collection and urine preservation/storage that allow maintaining as much as possible the original metabolic profile of the fresh samples emerge, and are proposed as SOPs for biobanking.

  3. Remote handling machines

    International Nuclear Information System (INIS)

    Sato, Shinri

    1985-01-01

    In nuclear power facilities, the management of radioactive wastes is made with its technology plus the automatic techniques. Under the radiation field, the maintenance or aid of such systems is important. To cope with this situation, MF-2 system, MF-3 system and a manipulator system as remote handling machines are described. MF-2 system consists of an MF-2 carrier truck, a control unit and a command trailer. It is capable of handling heavy-weight objects. The system is not by hydraulic but by electrical means. MF-3 system consists of a four-crawler truck and a manipulator. The truck is versatile in its posture by means of the four independent crawlers. The manipulator system is bilateral in operation, so that the delicate handling is made possible. (Mori, K.)

  4. Fleet Assistance and Support Team (FAST) Lab

    Data.gov (United States)

    Federal Laboratory Consortium — The FAST team was established by PMA-264 for introduction of multistatic ASW systems into the Fleet.FAST provides Air ASW mission planning, tactics/tactical sensor...

  5. Fleet replacement modeling : final report, July 2009.

    Science.gov (United States)

    2009-07-01

    This project focused on two interrelated areas in equipment replacement modeling for fleets. The first area was research-oriented and addressed a fundamental assumption in engineering economic replacement modeling that all assets providing a similar ...

  6. Temporal Optimization Planning for Fleet Repositioning

    DEFF Research Database (Denmark)

    Tierney, Kevin; Jensen, Rune Møller

    2011-01-01

    Fleet repositioning problems pose a high financial bur- den on shipping firms, but have received little attention in the literature, despite their high importance to the shipping industry. Fleet repositioning problems are characterized by chains of interacting activities, but state-of-the-art pla......Fleet repositioning problems pose a high financial bur- den on shipping firms, but have received little attention in the literature, despite their high importance to the shipping industry. Fleet repositioning problems are characterized by chains of interacting activities, but state......-of-the-art planning and scheduling techniques do not offer cost models that are rich enough to represent essential objectives of these problems. To this end, we introduce a novel framework called Temporal Optimization Planning (TOP). TOP uses partial order planning to build optimization models associated...

  7. Future Fleet Project. What Can We Afford

    Science.gov (United States)

    2016-12-21

    available to maintain the readiness of the fleet. The reduction in readiness spending coupled with continuing demands from COCOMs for assets eroded... coupled with continuing demands from COCOMs for assets eroded the number of ships in ready‑to‑deploy status. CBO’s estimate of $20.2 billion per...less-expensive aircraft carriers, and additional SSNs. Our intent in designing this fleet is to use the money saved in buying less-expensive

  8. Safe handling of tritium

    International Nuclear Information System (INIS)

    1991-01-01

    The main objective of this publication is to provide practical guidance and recommendations on operational radiation protection aspects related to the safe handling of tritium in laboratories, industrial-scale nuclear facilities such as heavy-water reactors, tritium removal plants and fission fuel reprocessing plants, and facilities for manufacturing commercial tritium-containing devices and radiochemicals. The requirements of nuclear fusion reactors are not addressed specifically, since there is as yet no tritium handling experience with them. However, much of the material covered is expected to be relevant to them as well. Annex III briefly addresses problems in the comparatively small-scale use of tritium at universities, medical research centres and similar establishments. However, the main subject of this publication is the handling of larger quantities of tritium. Operational aspects include designing for tritium safety, safe handling practice, the selection of tritium-compatible materials and equipment, exposure assessment, monitoring, contamination control and the design and use of personal protective equipment. This publication does not address the technologies involved in tritium control and cleanup of effluents, tritium removal, or immobilization and disposal of tritium wastes, nor does it address the environmental behaviour of tritium. Refs, figs and tabs

  9. Handling of potassium

    International Nuclear Information System (INIS)

    Schwarz, N.; Komurka, M.

    1983-03-01

    As a result for the Fast Breeder Development extensive experience is available worldwide with respect to Sodium technology. Due to the extension of the research program to topping cycles with Potassium as the working medium, test facilities with Potassium have been designed and operated in the Institute of Reactor Safety. The different chemical properties of Sodium and Potassium give rise in new safety concepts and operating procedures. The handling problems of Potassium are described in the light of theoretical properties and own experiences. Selected literature on main safety and operating problems complete this report. (Author) [de

  10. What is behind fleet evolution: a framework for flow analysis and application to the French Atlantic fleet

    OpenAIRE

    Quillérou, Emmanuelle; Guyader, Olivier

    2012-01-01

    The study of fishery dynamics considers national-level fleet evolution. It has, however, failed to consider the flows behind fleet evolution as well as the impact of the dynamics of owners of invested capital on fleet evolution. This paper establishes a general conceptual framework which identifies different vessel and owner flows behind fleet evolution and some relationships between these flows. This descriptive conceptual framework aims to change the current focus on drivers of fleet evolut...

  11. Waste Handling Building Conceptual Study

    International Nuclear Information System (INIS)

    G.W. Rowe

    2000-01-01

    The objective of the ''Waste Handling Building Conceptual Study'' is to develop proposed design requirements for the repository Waste Handling System in sufficient detail to allow the surface facility design to proceed to the License Application effort if the proposed requirements are approved by DOE. Proposed requirements were developed to further refine waste handling facility performance characteristics and design constraints with an emphasis on supporting modular construction, minimizing fuel inventory, and optimizing facility maintainability and dry handling operations. To meet this objective, this study attempts to provide an alternative design to the Site Recommendation design that is flexible, simple, reliable, and can be constructed in phases. The design concept will be input to the ''Modular Design/Construction and Operation Options Report'', which will address the overall program objectives and direction, including options and issues associated with transportation, the subsurface facility, and Total System Life Cycle Cost. This study (herein) is limited to the Waste Handling System and associated fuel staging system

  12. Optimal Routing for Heterogeneous Fixed Fleets of Multicompartment Vehicles

    Directory of Open Access Journals (Sweden)

    Qian Wang

    2014-01-01

    Full Text Available We present a metaheuristic called the reactive guided tabu search (RGTS to solve the heterogeneous fleet multicompartment vehicle routing problem (MCVRP, where a single vehicle is required for cotransporting multiple customer orders. MCVRP is commonly found in delivery of fashion apparel, petroleum distribution, food distribution, and waste collection. In searching the optimum solution of MCVRP, we need to handle a large amount of local optima in the solution spaces. To overcome this problem, we design three guiding mechanisms in which the search history is used to guide the search. The three mechanisms are experimentally demonstrated to be more efficient than the ones which only apply the known distance information. Armed with the guiding mechanisms and the well-known reactive mechanism, the RGTS can produce remarkable solutions in a reasonable computation time.

  13. Handling and Transport Problems

    Energy Technology Data Exchange (ETDEWEB)

    Pomarola, J. [Head of Technical Section, Atomic Energy Commission, Saclay (France); Savouyaud, J. [Head of Electro-Mechanical Sub-Division, Atomic Energy Commission, Saclay (France)

    1960-07-01

    Arrangements for special or dangerous transport operations by road arising out of the activities of the Atomic Energy Commission are made by the Works and Installations Division which acts in concert with the Monitoring and Protection Division (MPD) whenever radioactive substances or appliances are involved. In view of the risk of irradiation and contamination entailed in handling and transporting radioactive substances, including waste, a specialized transport and storage team has been formed as a complement to the emergency and decontamination teams.

  14. Studies and research concerning BNFP: cask handling equipment standardization

    International Nuclear Information System (INIS)

    McCreery, P.N.

    1980-10-01

    This report covers the activities of one of the sub-tasks within the Spent LWR Fuel Transportation Receiving, Handling, and Storage program. The sub-task is identified as Cask Handling Equipment Standardization. The objective of the sub-task specifies: investigate and identify opportunities for standardization of cask interface equipment. This study will examine the potential benefits of standardized yokes, decontamination barriers and special tools, and, to the extent feasible, standardized methods and software for handling the variety of casks presently available in the US fleet. The result of the investigations is a compilation of reports that are related by their common goal of reducing cask turnaround time

  15. Addressing the minimum fleet problem in on-demand urban mobility.

    Science.gov (United States)

    Vazifeh, M M; Santi, P; Resta, G; Strogatz, S H; Ratti, C

    2018-05-01

    Information and communication technologies have opened the way to new solutions for urban mobility that provide better ways to match individuals with on-demand vehicles. However, a fundamental unsolved problem is how best to size and operate a fleet of vehicles, given a certain demand for personal mobility. Previous studies 1-5 either do not provide a scalable solution or require changes in human attitudes towards mobility. Here we provide a network-based solution to the following 'minimum fleet problem', given a collection of trips (specified by origin, destination and start time), of how to determine the minimum number of vehicles needed to serve all the trips without incurring any delay to the passengers. By introducing the notion of a 'vehicle-sharing network', we present an optimal computationally efficient solution to the problem, as well as a nearly optimal solution amenable to real-time implementation. We test both solutions on a dataset of 150 million taxi trips taken in the city of New York over one year 6 . The real-time implementation of the method with near-optimal service levels allows a 30 per cent reduction in fleet size compared to current taxi operation. Although constraints on driver availability and the existence of abnormal trip demands may lead to a relatively larger optimal value for the fleet size than that predicted here, the fleet size remains robust for a wide range of variations in historical trip demand. These predicted reductions in fleet size follow directly from a reorganization of taxi dispatching that could be implemented with a simple urban app; they do not assume ride sharing 7-9 , nor require changes to regulations, business models, or human attitudes towards mobility to become effective. Our results could become even more relevant in the years ahead as fleets of networked, self-driving cars become commonplace 10-14 .

  16. MFTF exception handling system

    International Nuclear Information System (INIS)

    Nowell, D.M.; Bridgeman, G.D.

    1979-01-01

    In the design of large experimental control systems, a major concern is ensuring that operators are quickly alerted to emergency or other exceptional conditions and that they are provided with sufficient information to respond adequately. This paper describes how the MFTF exception handling system satisfies these requirements. Conceptually exceptions are divided into one of two classes. Those which affect command status by producing an abort or suspend condition and those which fall into a softer notification category of report only or operator acknowledgement requirement. Additionally, an operator may choose to accept an exception condition as operational, or turn off monitoring for sensors determined to be malfunctioning. Control panels and displays used in operator response to exceptions are described

  17. DEVELOPMENT OF THE TRU WASTE TRANSPORTATION FLEET--A SUCCESS STORY

    International Nuclear Information System (INIS)

    Devarakonda, Murthy; Morrison, Cindy; Brown, Mike

    2003-01-01

    Since March 1999, the Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been operated by the U.S. Department of Energy (DOE), Carlsbad Field Office (CBFO), as a repository for the permanent disposal of defense-related transuranic (TRU) waste. More than 1,450 shipments of TRU waste for WIPP disposal have been completed, and the WIPP is currently receiving 12 to 16 shipments per week from five DOE sites around the nation. One of the largest fleets of Type B packagings supports the transportation of TRU waste to WIPP. This paper discusses the development of this fleet since the original Certificate of Compliance (C of C) for the Transuranic Package Transporter-II (TRUPACT-II) was issued by the U.S. Nuclear Regulatory Commission (NRC) in 1989. Evolving site programs, closure schedules of major sites, and the TRU waste inventory at the various DOE sites have directed the sizing and packaging mix of this fleet. This paper discusses the key issues that guided this fleet development, including the following: While the average weight of a 55-gallon drum packaging debris could be less than 300 pounds (lbs.), drums containing sludge waste or compacted waste could approach the maximum allowable weight of 1,000 lbs. A TRUPACT-II shipment may consist of three TRUPACT-II packages, each of which is limited to a total weight of 19,250 lbs. Payload assembly weights dictated by ''as-built'' TRUPACT-II weights limit each drum to an average weight of 312 lbs when three TRUPACT-IIs are shipped. To optimize the shipment of heavier drums, the HalfPACT packaging was designed as a shorter and lighter version of the TRUPACT-II to accommodate a heavier load. Additional packaging concepts are currently under development, including the ''TRUPACT-III'' packaging being designed to address ''oversized'' boxes that are currently not shippable in the TRUPACT-II or HalfPACT due to size constraints. Shipment optimization is applicable not only to the addition of new

  18. Fleet Planning Decision-Making: Two-Stage Optimization with Slot Purchase

    Directory of Open Access Journals (Sweden)

    Lay Eng Teoh

    2016-01-01

    Full Text Available Essentially, strategic fleet planning is vital for airlines to yield a higher profit margin while providing a desired service frequency to meet stochastic demand. In contrast to most studies that did not consider slot purchase which would affect the service frequency determination of airlines, this paper proposes a novel approach to solve the fleet planning problem subject to various operational constraints. A two-stage fleet planning model is formulated in which the first stage selects the individual operating route that requires slot purchase for network expansions while the second stage, in the form of probabilistic dynamic programming model, determines the quantity and type of aircraft (with the corresponding service frequency to meet the demand profitably. By analyzing an illustrative case study (with 38 international routes, the results show that the incorporation of slot purchase in fleet planning is beneficial to airlines in achieving economic and social sustainability. The developed model is practically viable for airlines not only to provide a better service quality (via a higher service frequency to meet more demand but also to obtain a higher revenue and profit margin, by making an optimal slot purchase and fleet planning decision throughout the long-term planning horizon.

  19. Handling uncertainty

    DEFF Research Database (Denmark)

    Jønsson, Jesper Bosse; Fold, Niels

    2009-01-01

    Small-scale mining supports the livelihoods of several hundred thousand rural households in Africa. Nonetheless, the understanding of the organizational dynamics of small-scale miners' activities is modest. The paper outlines the small-scale mining codes in Tanzania and contrasts them to prevalent...... organizational practices in two Tanzanian small-scale mining settlements. It is argued that there is a need to adjust the regulatory mechanisms to well-consolidated practices: If basic practices differ substantially from official prescriptions of the mining codes over an extended period of time, certain elements...... manoeuvring of local small-scale mining operators and the reasons for the variations are essential to understand for policymakers and development practitioners. By incorporating prevalent practices and context-dependent variations in some of the crucial organizational components, it is possible to design...

  20. Clean Cities Case Study: Barwood Cab Fleet Study Summary

    International Nuclear Information System (INIS)

    Whalen, P.

    1999-01-01

    Barwood Cab Fleet Study Summary is the second in a new series called''Alternative Fuel Information Case Studies,'' designed to present real-world experiences with alternative fuels to fleet managers and other industry stakeholders

  1. Sophisticated fuel handling system evolved

    International Nuclear Information System (INIS)

    Ross, D.A.

    1988-01-01

    The control systems at Sellafield fuel handling plant are described. The requirements called for built-in diagnostic features as well as the ability to handle a large sequencing application. Speed was also important; responses better than 50ms were required. The control systems are used to automate operations within each of the three main process caves - two Magnox fuel decanners and an advanced gas-cooled reactor fuel dismantler. The fuel route within the fuel handling plant is illustrated and described. ASPIC (Automated Sequence Package for Industrial Control) which was developed as a controller for the plant processes is described. (U.K.)

  2. AVTA federal fleet PEV readiness data logging and characterization study for the National Park Service: Grand Canyon National Park

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Intertek Testing Services, Phoenix, AZ (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States); Nienhueser, Ian [Intertek Testing Services, Phoenix, AZ (United States)

    2014-08-01

    This report focuses on the Grand Canyon National Park (GCNP) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively PEVs) can fulfill the mission requirements.

  3. 41 CFR 101-39.306 - Operator's packet.

    Science.gov (United States)

    2010-07-01

    ...-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.3-Use and Care of GSA Interagency Fleet Management System Vehicles § 101-39.306 Operator's packet. The GSA Interagency Fleet Management System (IFMS) will provide each... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Operator's packet. 101-39...

  4. Strategic fleet planning for city logistics

    NARCIS (Netherlands)

    Franceschetti, Anna; Honhon, Dorothee; Laporte, G.; van Woensel, T.; Fransoo, J.C.

    2017-01-01

    We study the strategic problem of a logistics service provider managing a (possibly heterogeneous) fleet of vehicles to serve a city in the presence of access restrictions. We model the problem as an area partitioning problem in which a rectangular service area has to be divided into sectors, each

  5. Formation of optimal construction fleet composition

    Science.gov (United States)

    Tuskaeva, Zalina

    2017-10-01

    Machinery supply and its rational use in construction processes considerably determine the final product of construction organizations. Therefore, the problem of defining the type size composition of the construction fleet as one of the lowest material-intensive productions, is of a particular importance.

  6. Cask system design guidance for robotic handling

    International Nuclear Information System (INIS)

    Griesmeyer, J.M.; Drotning, W.D.; Morimoto, A.K.; Bennett, P.C.

    1990-10-01

    Remote automated cask handling has the potential to reduce both the occupational exposure and the time required to process a nuclear waste transport cask at a handling facility. The ongoing Advanced Handling Technologies Project (AHTP) at Sandia National Laboratories is described. AHTP was initiated to explore the use of advanced robotic systems to perform cask handling operations at handling facilities for radioactive waste, and to provide guidance to cask designers regarding the impact of robotic handling on cask design. The proof-of-concept robotic systems developed in AHTP are intended to extrapolate from currently available commercial systems to the systems that will be available by the time that a repository would be open for operation. The project investigates those cask handling operations that would be performed at a nuclear waste repository facility during cask receiving and handling. The ongoing AHTP indicates that design guidance, rather than design specification, is appropriate, since the requirements for robotic handling do not place severe restrictions on cask design but rather focus on attention to detail and design for limited dexterity. The cask system design features that facilitate robotic handling operations are discussed, and results obtained from AHTP design and operation experience are summarized. The application of these design considerations is illustrated by discussion of the robot systems and their operation on cask feature mock-ups used in the AHTP project. 11 refs., 11 figs

  7. Uranium hexafluoride handling

    International Nuclear Information System (INIS)

    1991-01-01

    The United States Department of Energy, Oak Ridge Field Office, and Martin Marietta Energy Systems, Inc., are co-sponsoring this Second International Conference on Uranium Hexafluoride Handling. The conference is offered as a forum for the exchange of information and concepts regarding the technical and regulatory issues and the safety aspects which relate to the handling of uranium hexafluoride. Through the papers presented here, we attempt not only to share technological advances and lessons learned, but also to demonstrate that we are concerned about the health and safety of our workers and the public, and are good stewards of the environment in which we all work and live. These proceedings are a compilation of the work of many experts in that phase of world-wide industry which comprises the nuclear fuel cycle. Their experience spans the entire range over which uranium hexafluoride is involved in the fuel cycle, from the production of UF 6 from the naturally-occurring oxide to its re-conversion to oxide for reactor fuels. The papers furnish insights into the chemical, physical, and nuclear properties of uranium hexafluoride as they influence its transport, storage, and the design and operation of plant-scale facilities for production, processing, and conversion to oxide. The papers demonstrate, in an industry often cited for its excellent safety record, continuing efforts to further improve safety in all areas of handling uranium hexafluoride

  8. Uranium hexafluoride handling. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    The United States Department of Energy, Oak Ridge Field Office, and Martin Marietta Energy Systems, Inc., are co-sponsoring this Second International Conference on Uranium Hexafluoride Handling. The conference is offered as a forum for the exchange of information and concepts regarding the technical and regulatory issues and the safety aspects which relate to the handling of uranium hexafluoride. Through the papers presented here, we attempt not only to share technological advances and lessons learned, but also to demonstrate that we are concerned about the health and safety of our workers and the public, and are good stewards of the environment in which we all work and live. These proceedings are a compilation of the work of many experts in that phase of world-wide industry which comprises the nuclear fuel cycle. Their experience spans the entire range over which uranium hexafluoride is involved in the fuel cycle, from the production of UF{sub 6} from the naturally-occurring oxide to its re-conversion to oxide for reactor fuels. The papers furnish insights into the chemical, physical, and nuclear properties of uranium hexafluoride as they influence its transport, storage, and the design and operation of plant-scale facilities for production, processing, and conversion to oxide. The papers demonstrate, in an industry often cited for its excellent safety record, continuing efforts to further improve safety in all areas of handling uranium hexafluoride. Selected papers were processed separately for inclusion in the Energy Science and Technology Database.

  9. Torus sector handling system

    International Nuclear Information System (INIS)

    Grisham, D.L.

    1981-01-01

    A remote handling system is proposed for moving a torus sector of the accelerator from under the cryostat to a point where it can be handled by a crane and for the reverse process for a new sector. Equipment recommendations are presented, as well as possible alignment schemes. Some general comments about future remote-handling methods and the present capabilities of existing systems will also be included. The specific task to be addressed is the removal and replacement of a 425 to 450 ton torus sector. This requires a horizontal movement of approx. 10 m from a normal operating position to a point where its further transport can be accomplished by more conventional means (crane or floor transporter). The same horizontal movement is required for reinstallation, but a positional tolerance of 2 cm is required to allow reasonable fit-up for the vacuum seal from the radial frames to the torus sector. Since the sectors are not only heavy but rather tall and narrow, the transport system must provide a safe, stable, and repeatable method fo sector movement. This limited study indicates that the LAMPF-based method of transporting torus sectors offers a proven method of moving heavy items. In addition, the present state of the art in remote equipment is adequate for FED maintenance

  10. SRV-automatic handling device

    International Nuclear Information System (INIS)

    Yamada, Koji

    1987-01-01

    Automatic handling device for the steam relief valves (SRV's) is developed in order to achieve a decrease in exposure of workers, increase in availability factor, improvement in reliability, improvement in safety of operation, and labor saving. A survey is made during a periodical inspection to examine the actual SVR handling operation. An SRV automatic handling device consists of four components: conveyor, armed conveyor, lifting machine, and control/monitoring system. The conveyor is so designed that the existing I-rail installed in the containment vessel can be used without any modification. This is employed for conveying an SRV along the rail. The armed conveyor, designed for a box rail, is used for an SRV installed away from the rail. By using the lifting machine, an SRV installed away from the I-rail is brought to a spot just below the rail so that the SRV can be transferred by the conveyor. The control/monitoring system consists of a control computer, operation panel, TV monitor and annunciator. The SRV handling device is operated by remote control from a control room. A trial equipment is constructed and performance/function testing is carried out using actual SRV's. As a result, is it shown that the SRV handling device requires only two operators to serve satisfactorily. The required time for removal and replacement of one SRV is about 10 minutes. (Nogami, K.)

  11. Cost, Energy, and Environmental Impact of Automated Electric Taxi Fleets in Manhattan.

    Science.gov (United States)

    Bauer, Gordon S; Greenblatt, Jeffery B; Gerke, Brian F

    2018-04-17

    Shared automated electric vehicles (SAEVs) hold great promise for improving transportation access in urban centers while drastically reducing transportation-related energy consumption and air pollution. Using taxi-trip data from New York City, we develop an agent-based model to predict the battery range and charging infrastructure requirements of a fleet of SAEVs operating on Manhattan Island. We also develop a model to estimate the cost and environmental impact of providing service and perform extensive sensitivity analysis to test the robustness of our predictions. We estimate that costs will be lowest with a battery range of 50-90 mi, with either 66 chargers per square mile, rated at 11 kW or 44 chargers per square mile, rated at 22 kW. We estimate that the cost of service provided by such an SAEV fleet will be $0.29-$0.61 per revenue mile, an order of magnitude lower than the cost of service of present-day Manhattan taxis and $0.05-$0.08/mi lower than that of an automated fleet composed of any currently available hybrid or internal combustion engine vehicle (ICEV). We estimate that such an SAEV fleet drawing power from the current NYC power grid would reduce GHG emissions by 73% and energy consumption by 58% compared to an automated fleet of ICEVs.

  12. Correlating Dynamometer Testing to In-Use Fleet Results of Plug-In Hybrid Electric Vehicles

    Energy Technology Data Exchange (ETDEWEB)

    John G. Smart; Sera White; Michael Duoba

    2009-05-01

    Standard dynamometer test procedures are currently being developed to determine fuel and electrical energy consumption of plug-in hybrid vehicles (PHEV). To define a repeatable test procedure, assumptions were made about how PHEVs will be driven and charged. This study evaluates these assumptions by comparing results of PHEV dynamometer testing following proposed procedures to actual performance of PHEVs operating in the US Department of Energy’s (DOE) North American PHEV Demonstration fleet. Results show PHEVs in the fleet exhibit a wide range of energy consumption, which is not demonstrated in dynamometer testing. Sources of variation in performance are identified and examined.

  13. What Fleets Need to Know About Alternative Fuel Vehicle Conversions, Retrofits, and Repowers

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, K.; Gonzales, J.

    2017-10-02

    Many fleet managers have opted to incorporate alternative fuels and advanced vehicles into their lineup. Original equipment manufacturers (OEMs) offer a variety of choices, and there are additional options offered by aftermarket companies. There are also a myriad of ways that existing vehicles can be modified to utilize alternative fuels and other advanced technologies. Vehicle conversions and retrofit packages, along with engine repower options, can offer an ideal way to lower vehicle operating costs. This can result in long term return on investment, in addition to helping fleet managers achieve emissions and environmental goals. This report summarizes the various factors to consider when pursuing a conversion, retrofit, or repower option.

  14. What Fleets Need to Know About Alternative Fuel Vehicle Conversions, Retrofits, and Repowers

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Kay L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Gonzales, John [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-10-17

    Many fleet managers have opted to incorporate alternative fuels and advanced vehicles into their lineup. Original equipment manufacturers (OEMs) offer a variety of choices, and there are additional options offered by aftermarket companies. There are also a myriad of ways that existing vehicles can be modified to utilize alternative fuels and other advanced technologies. Vehicle conversions and retrofit packages, along with engine repower options, can offer an ideal way to lower vehicle operating costs. This can result in long term return on investment, in addition to helping fleet managers achieve emissions and environmental goals. This report summarizes the various factors to consider when pursuing a conversion, retrofit, or repower option.

  15. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA White Sands Test Facility

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Idaho National Lab. (INL), Idaho Falls, ID (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-10-01

    This report focuses on the NASA White Sands Test Facility (WSTF) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

  16. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for National Institute of Health

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Idaho National Lab. (INL), Idaho Falls, ID (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-11-01

    This report focuses on the National Institute of Health (NIH) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

  17. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA Glenn Research Center

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Idaho National Lab. (INL), Idaho Falls, ID (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-10-01

    The Advanced Vehicle Testing Activity’s study seeks to collect and evaluate data to validate the utilization of advanced plug-in electric vehicle (PEV) transportation. This report focuses on the NASA Glenn Research Center (GRC) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.

  18. Fleet Evaluation and Factory Installation of Aerodynamic Heavy Duty Truck Trailers

    Energy Technology Data Exchange (ETDEWEB)

    Beck, Jason; Salari, Kambiz; Ortega, Jason; Brown, Andrea

    2013-09-30

    The purpose of DE-EE0001552 was to develop and deploy a combination of trailer aerodynamic devices and low rolling resistance tires that reduce fuel consumption of a class 8 heavy duty tractor-trailer combination vehicle by 15%. There were 3 phases of the project: Phase 1 – Perform SAE Typed 2 track tests with multiple device combinations. Phase 2 – Conduct a fleet evaluation with selected device combination. Phase 3 – Develop the devices required to manufacture the aerodynamic trailer. All 3 phases have been completed. There is an abundance of available trailer devices on the market, and fleets and owner operators have awareness of them and are purchasing them. The products developed in conjunction with this project are at least in their second round of refinement. The fleet test undertaken showed an improvement of 5.5 – 7.8% fuel economy with the devices (This does not include tire contribution).

  19. Assessment of Fleet Inventory for Naval Air Station Whidbey Island. Task 1

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Idaho National Lab. (INL), Idaho Falls, ID (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-06-01

    Task 1includes a survey of the inventory of non-tactical fleet vehicles at Naval Air Station Whidbey Island (NASWI) to characterize the fleet. This information and characterization are used to select vehicles for monitoring that takes place during Task 2. This monitoring involves data logging of vehicle operation in order to identify the vehicle’s mission and travel requirements. Individual observations of these selected vehicles provide the basis for recommendations related to PEV adoption. It also identifies whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements and provide observations related to placement of PEV charging infrastructure. This report provides the results of the assessments and observations of the current non-tactical fleet, fulfilling the Task 1 requirements.

  20. Multiobjective optimization for nuclear fleet evolution scenarios using COSI

    Directory of Open Access Journals (Sweden)

    Freynet David

    2016-01-01

    Full Text Available The consequences of various fleet evolution options on material inventories and flux in fuel cycle and waste can be analysed by means of transition scenario studies. The COSI code is currently simulating chronologically scenarios whose parameters are fully defined by the user and is coupled with the CESAR depletion code. As the interactions among reactors and fuel cycle facilities can be complex, and the ways in which they may be configured are many, the development of optimization methodology could improve scenario studies. The optimization problem definition needs to list: (i criteria (e.g. saving natural resources and minimizing waste production; (ii variables (scenario parameters related to reprocessing, reactor operation, installed power distribution, etc.; (iii constraints making scenarios industrially feasible. The large number of scenario calculations needed to solve an optimization problem can be time-consuming and hardly achievable; therefore, it requires the shortening of the COSI computation time. Given that CESAR depletion calculations represent about 95% of this computation time, CESAR surrogate models have been developed and coupled with COSI. Different regression models are compared to estimate CESAR outputs: first- and second-order polynomial regressions, Gaussian process and artificial neural network. This paper is about a first optimization study of a transition scenario from the current French nuclear fleet to a Sodium Fast Reactors fleet as defined in the frame of the 2006 French Act for waste management. The present article deals with obtaining the optimal scenarios and validating the methodology implemented, i.e. the coupling between the simulation software COSI, depletion surrogate models and a genetic algorithm optimization method.

  1. TEMAS: fleet-based bio-economic simulation software to evaluate management strategies accounting for fleet behaviour

    DEFF Research Database (Denmark)

    Ulrich, Clara; Andersen, Bo Sølgaard; Sparre, Per Johan

    2007-01-01

    TEMAS (technical management measures) is a fleet-based bio-economic software for evaluating management strategies accounting for technical measures and fleet behaviour. It focuses on mixed fisheries in which several fleets can choose among several fishing activities to target different stocks...

  2. 77 FR 14482 - Petroleum Reduction and Alternative Fuel Consumption Requirements for Federal Fleets

    Science.gov (United States)

    2012-03-12

    ...-road or non-road vehicle. \\2\\ The definition of the term ``low-speed electric vehicle,'' as used... alternative fuel used in Federal fleet motor vehicles. This report also would include the alternative fuel...-- (1) a motor vehicle that operates solely on alternative fuel; or (2) a low-speed electric vehicle. (g...

  3. Off-wing fleet maintenance study of a CFM56-3B turbofan engine ...

    African Journals Online (AJOL)

    An off wing fleet maintenance study of the CFM56-3B Turbofan engine that propels the Boeing 737-300 aircraft is presented. The engine performance and deteriorating behavior was modeled with a view to estimate the creep life consumption and operating severity. The predicted severity factor of each degradation was ...

  4. Causes and consequences of fleet diversity in fisheries: The case of the Norwegian Barents Sea cod fishery

    Directory of Open Access Journals (Sweden)

    Arne Eide

    2016-05-01

    Full Text Available Abstract Fisheries operate under fluctuating environmental conditions, targeting fish stocks that appear in varying densities in different areas, often with abrupt and unexpected local changes. Physical conditions, markets and management regulations constrain vessels in different and varying ways. These factors all contribute to forming the fleet diversity we find in most fisheries. Here, a simulation model of the Northeast Arctic cod fishery is used in order to investigate how this diversity is formed and maintained, assuming rational economic behaviour under varying combined constraints. The study also focuses on how the ability of vessels to find fish influences fleet diversity, profitability, stock development and seasonal profiles of the fishery. Results indicate that an increased ability to target the most profitable fishing grounds may influence fleet diversity positively or negatively, depending on overall exploitation level. High exploitation rates also increase the temporal fluctuations in fleet diversity and profits, which are amplified as the fish-finding ability increases.

  5. Modelling energy demand for a fleet of hydrogen-electric vehicles interacting with a clean energy hub

    International Nuclear Information System (INIS)

    Syed, F.; Fowler, M.; Wan, D.; Maniyali, Y.

    2009-01-01

    This paper details the development of an energy demand model for a hydrogen-electric vehicle fleet and the modelling of the fleet interactions with a clean energy hub. The approach taken is to model the architecture and daily operation of every individual vehicle in the fleet. A generic architecture was developed based on understanding gained from existing detailed models used in vehicle powertrain design, with daily operation divided into two periods: charging and travelling. During the charging period, the vehicle charges its Electricity Storage System (ESS) and refills its Hydrogen Storage System (HSS), and during the travelling period, the vehicle depletes the ESS and HSS based on distance travelled. Daily travel distance is generated by a stochastic model and is considered an input to the fleet model. The modelling of a clean energy hub is also presented. The clean energy hub functions as an interface between electricity supply and the energy demand (i.e. hydrogen and electricity) of the vehicle fleet. Finally, a sample case is presented to demonstrate the use of the fleet model and its implications on clean energy hub sizing. (author)

  6. INL Fleet Vehicle Characterization Study for the U.S. Department of Navy

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Brion Dale [Idaho National Lab. (INL), Idaho Falls, ID (United States); Francfort, James Edward [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smart, John Galloway [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for U.S. Department of Energy Advanced Vehicle Testing. Battelle Energy Alliance, LLC collected and evaluated data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization Study. The Advanced Vehicle Testing Activity’s study seeks to collect and evaluate data to validate use of advanced plug-in electric vehicle (PEV) transportation. This report focuses on US Department of Navy's fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agency’s fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.

  7. Guidelines for the Establishment of a Model Neighborhood Electric Vehicle (NEV) Fleet

    Energy Technology Data Exchange (ETDEWEB)

    Roberta Brayer; Donald Karner; Kevin Morrow; James Francfort

    2006-06-01

    The U.S. Department of Energy’s Advanced Vehicle Testing Activity tests neighborhood electric vehicles (NEVs) in both track and fleet testing environments. NEVs, which are also known as low speed vehicles, are light-duty vehicles with top speeds of between 20 and 25 mph, and total gross vehicle weights of approximately 2,000 pounds or less. NEVs have been found to be very viable alternatives to internal combustion engine vehicles based on their low operating costs. However, special charging infrastructure is usually necessary for successful NEV fleet deployment. Maintenance requirements are also unique to NEVs, especially if flooded lead acid batteries are used as they have watering requirements that require training, personnel protection equipment, and adherence to maintenance schedules. This report provides guidelines for fleet managers to follow in order to successfully introduce and operate NEVs in fleet environments. This report is based on the NEV testing and operational experience of personnel from the Advanced Vehicle Testing Activity, Electric Transportation Applications, and the Idaho National Laboratory.

  8. Remote handling in ZEPHYR

    International Nuclear Information System (INIS)

    Andelfinger, C.; Lackner, E.; Ulrich, M.; Weber, G.; Schilling, H.B.

    1982-04-01

    A conceptual design of the ZEPHYR building is described. The listed radiation data show that remote handling devices will be necessary in most areas of the building. For difficult repair and maintenance works it is intended to transfer complete units from the experimental hall to a hot cell which provides better working conditions. The necessary crane systems and other transport means are summarized as well as suitable commercially available manipulators and observation devices. The conept of automatic devices for cutting and welding and other operations inside the vacuum vessel and the belonging position control system is sketched. Guidelines for the design of passive components are set up in order to facilitate remote operation. (orig.)

  9. Controlled pump with internal toothed gears during four-quadrant operation. Velocity- and position control of a hydraulic handling device; Geregelte Innenzahnradpumpe im Mehrquadrantenbetrieb. Geschwindigkeits- und Positionsregelung eines hydraulischen Handlinggeraetes

    Energy Technology Data Exchange (ETDEWEB)

    Dahmann, P. [Fachhochschule Aachen (Germany). FB Luft- und Raumfahrttechnik; Hagemeister, W. [IGH, Essen (Germany); Nagel, G.; Exner, P. [Voith Turbo, Heidenheim (Germany)

    2006-07-01

    The drive of a handling device (weight 3t) is realized by an hydrocylinder, which is directly connected with the pressure side of a pump with internal toothed gears. The drive speed is generated by a frequency controlled electric motor. As a result for frequency-controlled drive can be noted less noise formation, less heat generation, an energy efficienct operation as a simple control- and regulation possibilities for position and velocities. (GL)

  10. Process Approach for Modeling of Machine and Tractor Fleet Structure

    Science.gov (United States)

    Dokin, B. D.; Aletdinova, A. A.; Kravchenko, M. S.; Tsybina, Y. S.

    2018-05-01

    The existing software complexes on modelling of the machine and tractor fleet structure are mostly aimed at solving the task of optimization. However, the creators, choosing only one optimization criterion and incorporating it in their software, provide grounds on why it is the best without giving a decision maker the opportunity to choose it for their enterprise. To analyze “bottlenecks” of machine and tractor fleet modelling, the authors of this article created a process model, in which they included adjustment to the plan of using machinery based on searching through alternative technologies. As a result, the following recommendations for software complex development have been worked out: the introduction of a database of alternative technologies; the possibility for a user to change the timing of the operations even beyond the allowable limits and in that case the calculation of the incurred loss; the possibility to rule out the solution of an optimization task, and if there is a necessity in it - the possibility to choose an optimization criterion; introducing graphical display of an annual complex of works, which could be enough for the development and adjustment of a business strategy.

  11. Development of commercial robots for radwaste handling

    International Nuclear Information System (INIS)

    Colborn, K.A.

    1988-01-01

    The cost and dose burden associated with low level radwaste handling activities is a matter of increasing concern to the commercial nuclear power industry. This concern is evidenced by the fact that many utilities have begun to revaluate waste generation, handling, and disposal activities at their plants in an effort to improve their overall radwaste handling operations. This paper reports on the project Robots for Radwaste Handling, to identify the potential of robots to improve radwaste handling operations. The project has focussed on the potential of remote or automated technology to improve well defined, recognizable radwaste operations. The project focussed on repetitive, low skill level radwaste handling and decontamination tasks which involve significant radiation exposure

  12. Policies towards a more efficient car fleet

    International Nuclear Information System (INIS)

    Mandell, Svante

    2009-01-01

    Transportation within the EU, as in most of the industrialized world, shows an increasing trend in CO 2 emissions. This calls for measures to decrease the amount of transportation but also to increase the efficiency in the vehicle fleet. To achieve this, numerous policy measures are available, all of which targets the agents in the economy in various ways. Policy makers thus face a highly complex task. The present paper aims at providing a simple and transparent analytical model that illustrates how different policy measures address different parts of an interlinked system, which determines the composition of the future car fleet. Apart from being simple, and thereby providing an intuitive framework, the model provides important lessons for policy design, e.g., through highlighting the difference between initial responses to policies and the outcome in equilibrium both in the short and the long run.

  13. Needs of anticipation for transport operations

    International Nuclear Information System (INIS)

    Galtier, J.

    2005-01-01

    COGEMA LOGISTICS (formerly Transnucleaire) has designed and manufactured several thousands of casks, and owns fleet of more than 4000 casks. Benefiting from more than 40 years of experience in cask shipment COGEMA LOGISTICS has demonstrated an outstanding performance in transportation and has integrated all feed back from past successful operations in current ones. Early anticipation of needs, i.e. at preliminary design step, is of major importance from a technical point of view (capacity, interface, handling means, licensing), and also in terms of political and public acceptance issues from the design step. This paper will highlight for each step required for the implementation of an optimal transport and storage system: Decision to proceed (including political aspects)-Design of casks to be used (including operational interface)-Licensing process-Manufacturing process-Transport plan, Public Acceptance-Loading Operations-Transport-Maintenance operations. (authors)

  14. Radioactive wastes handling facility

    International Nuclear Information System (INIS)

    Hirose, Emiko; Inaguma, Masahiko; Ozaki, Shigeru; Matsumoto, Kaname.

    1997-01-01

    There are disposed an area where a conveyor is disposed for separating miscellaneous radioactive solid wastes such as metals, on area for operators which is disposed in the direction vertical to the transferring direction of the conveyor, an area for receiving the radioactive wastes and placing them on the conveyor and an area for collecting the radioactive wastes transferred by the conveyor. Since an operator can conduct handling while wearing a working cloth attached to a partition wall as he wears his ordinary cloth, the operation condition can be improved and the efficiency for the separating work can be improved. When the area for settling conveyors and the area for the operators is depressurized, cruds on the surface of the wastes are not released to the outside and the working clothes can be prevented from being involved. Since the wastes are transferred by the conveyor, the operator's moving range is reduced, poisonous materials are fallen and moved through a sliding way to an area for collecting materials to be separated. Accordingly, the materials to be removed can be accumulated easily. (N.H.)

  15. Mission Engineering of a Rapid Cycle Spacecraft Logistics Fleet

    Science.gov (United States)

    Holladay, Jon; McClendon, Randy (Technical Monitor)

    2002-01-01

    The requirement for logistics re-supply of the International Space Station has provided a unique opportunity for engineering the implementation of NASA's first dedicated pressurized logistics carrier fleet. The NASA fleet is comprised of three Multi-Purpose Logistics Modules (MPLM) provided to NASA by the Italian Space Agency in return for operations time aboard the International Space Station. Marshall Space Flight Center was responsible for oversight of the hardware development from preliminary design through acceptance of the third flight unit, and currently manages the flight hardware sustaining engineering and mission engineering activities. The actual MPLM Mission began prior to NASA acceptance of the first flight unit in 1999 and will continue until the de-commission of the International Space Station that is planned for 20xx. Mission engineering of the MPLM program requires a broad focus on three distinct yet inter-related operations processes: pre-flight, flight operations, and post-flight turn-around. Within each primary area exist several complex subsets of distinct and inter-related activities. Pre-flight processing includes the evaluation of carrier hardware readiness for space flight. This includes integration of payload into the carrier, integration of the carrier into the launch vehicle, and integration of the carrier onto the orbital platform. Flight operations include the actual carrier operations during flight and any required real-time ground support. Post-flight processing includes de-integration of the carrier hardware from the launch vehicle, de-integration of the payload, and preparation for returning the carrier to pre-flight staging. Typical space operations are engineered around the requirements and objectives of a dedicated mission on a dedicated operational platform (i.e. Launch or Orbiting Vehicle). The MPLM, however, has expanded this envelope by requiring operations with both vehicles during flight as well as pre-launch and post

  16. Optimization of transit bus fleet's life cycle assessment impacts with alternative fuel options

    International Nuclear Information System (INIS)

    Ercan, Tolga; Zhao, Yang; Tatari, Omer; Pazour, Jennifer A.

    2015-01-01

    Public transportation is one of the most promising transportation modes to reduce the environmental emissions of the transportation sector in the U.S. In order to mitigate the environmental impacts brought by the transit bus system, new energy buses are introduced into the vehicle market. The goal of this study is to find an optimal bus fleet combination for different driving conditions to minimize life cycle cost, greenhouse gas emissions, and conventional air pollutant emission impacts. For this purpose, a Multi-Objective Linear Programming approach is used to select the optimum bus fleet combinations. Given different weight scenarios, this method could effectively provide solutions for decision makers with various budget constraints or emission reduction requirements. The results indicate that in heavily congested driving cycles such as the Manhattan area, the battery electric bus is the dominant vehicle type, while the hybrid bus has more balanced performances in most scenarios because of its lower initial investment comparing to battery electric buses. Petroleum powered buses have seldom been selected by the model. The trade-off analysis shows that the overall greenhouse gas impact performance is sensitive to the life cycle cost after certain points, which could provide valuable information for the bus fleet combination planning. - Highlights: • Hybrid-Life Cycle Assessment analysis approach for transit bus operations. • Optimizing the economic and sustainability impacts of transit bus fleet operation. • CO 2 emissions and other air pollutants related health and environmental damage cost. • Trade-offs between CO 2 emissions and cost of transit bus fleet operation.

  17. Impact of environmental constraints and aircraft technology on airline fleet composition

    Science.gov (United States)

    Moolchandani, Kushal A.

    This thesis models an airline's decisions about fleet evolution in order to maintain economic and regulatory viability. The aim is to analyze the fleet evolution under different scenarios of environmental policy and technology availability in order to suggest an optimal fleet under each case. An understanding of the effect of aircraft technologies, fleet size and age distribution, and operational procedures on airline performance may improve the quality of policies to achieve environmental goals. Additionally, the effect of decisions about fleet evolution on air travel is assessed as the change in market demand and profits of an abstracted, benevolent monopolist airline. Attention to the environmental impact of aviation has grown, and this has prompted several organizations such as ICAO (and, in response, NASA) to establish emissions reduction targets to reduce aviation's global climate impact. The introduction of new technology, change in operational procedures, etc. are some of the proposed means to achieve these targets. Of these, this thesis studies the efficacy of implementation of environmental policies in form of emissions constraints as a means to achieve these goals and assesses their impact on an airline's fleet evolution and technology use (along with resulting effects on air travel demand). All studies in this thesis are conducted using the Fleet-level Environmental Evaluation Tool (FLEET), a NASA sponsored simulation tool developed at Purdue University. This tool models airline operational decisions via a resource allocation problem and uses a system dynamics type approach to mimic airline economics, their decisions regarding retirement and acquisition of aircraft and evolution of market demand in response to the economic conditions. The development of an aircraft acquisition model for FLEET is a significant contribution of the author. Further, the author conducted a study of various environmental policies using FLEET. Studies introduce constraints on

  18. Excellence in fleet combat replacement squadrons: predicting carrier qualification success

    OpenAIRE

    Smith, Martin P.

    1988-01-01

    This thesis presents a two-part analysis of excellence criteria for fleet combat replacement squadrons. Part one focuses on the qualitative issues and management techniques identified in outstanding fleet combat replacement squadrons. Part two develops and presents a regression model for predicting a fleet replacement squadron pilot's carrier qualification grade. The model was derived using standard linear regression techniques and the SPSSx software package of the Naval Postgraduate School. ...

  19. Experience in handling concentrated tritium

    International Nuclear Information System (INIS)

    Holtslander, W.J.

    1985-12-01

    The notes describe the experience in handling concentrated tritium in the hydrogen form accumulated in the Chalk River Nuclear Laboratories Tritium Laboratory. The techniques of box operation, pumping systems, hydriding and dehydriding operations, and analysis of tritium are discussed. Information on the Chalk River Tritium Extraction Plant is included as a collection of reprints of papers presented at the Dayton Meeting on Tritium Technology, 1985 April 30 - May 2

  20. First Battleships of the Coast Defense of Russian Emperor Fleet

    Directory of Open Access Journals (Sweden)

    Yuri F. Katorin

    2015-12-01

    Full Text Available In this article it is told about design and building in Russia of the first tower armored ships, are given their characteristics, are described design features, and also basic stages of service in the composition of Baltic fleet, the advantages and disadvantages in the projects are analyzed. The authors come to the conclusion that the first navigation of tower armored vehicles revealed many design flaws. Low-built monitors and two-turret armored boat had very poor seakeeping. However, for advertising purposes the ten monitors in 1865 have been sent to the coast of Sweden. During the operation it was determined the necessity of combining the reliable protection with sufficient seaworthiness. The solution to this problem is reflected in the subsequent types of armored ships – the tower frigates.

  1. Enclosure for handling high activity materials

    International Nuclear Information System (INIS)

    Jimeno de Osso, F.

    1977-01-01

    One of the most important problems that are met at the laboratories producing and handling radioisotopes is that of designing, building and operating enclosures suitable for the safe handling of active substances. With this purpose in mind, an enclosure has been designed and built for handling moderately high activities under a shielding made of 150 mm thick lead. In this report a description is given of those aspects that may be of interest to people working in this field. (Author)

  2. Enclosure for handling high activity materials abstract

    International Nuclear Information System (INIS)

    Jimeno de Osso, F.; Dominguez Rodriguez, G.; Cruz Castillo, F. de la; Rodriguez Esteban, A.

    1977-01-01

    One of the most important problems that are met at the laboratories producing and handling radioisotopes is that of designing, building and operating enclosures suitable for the safe handling of active substances. With that purpose in mind, an enclosure has been designed and built for handling moderately high activities under a shielding made of 150 mm thick lead. A description is given of those aspects that may be of interest to people working in this field. (author) [es

  3. Scheduling of outbound luggage handling at airports

    DEFF Research Database (Denmark)

    Barth, Torben C.; Pisinger, David

    2012-01-01

    This article considers the outbound luggage handling problem at airports. The problem is to assign handling facilities to outbound flights and decide about the handling start time. This dynamic, near real-time assignment problem is part of the daily airport operations. Quality, efficiency......). Another solution method is a decomposition approach. The problem is divided into different subproblems and solved in iterative steps. The different solution approaches are tested on real world data from Frankfurt Airport....

  4. Enclosure for handling high activity materials

    Energy Technology Data Exchange (ETDEWEB)

    Jimeno de Osso, F

    1977-07-01

    One of the most important problems that are met at the laboratories producing and handling radioisotopes is that of designing, building and operating enclosures suitable for the safe handling of active substances. With this purpose in mind, an enclosure has been designed and built for handling moderately high activities under a shielding made of 150 mm thick lead. In this report a description is given of those aspects that may be of interest to people working in this field. (Author)

  5. Large Fleets Lead in Petroleum Reduction (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    Proc, H.

    2011-03-01

    Fact sheet describes Clean Cities' National Petroleum Reduction Partnership, an initiative through which large private fleets can receive support from Clean Cities to reduce petroleum consumption.

  6. A dynamic management of a public transportation fleet

    Directory of Open Access Journals (Sweden)

    Ireneusz Celiński

    2013-09-01

    Full Text Available Background: The present paper deals with the problems of a public transportation fleet management in public transportation operators. A management concept is proposed based on a real-time acquisition of parameters of public transportation passenger exchange. Methods: The relevant research utilised video materials documenting the processes of passenger exchange in public transportation. The proposed methodology is based on a dynamic real-time measurement of passenger streams. A characteristic feature of the measurement methodology applied is that the data is collected outside the vehicles, with a CCTV camera used per access point. Demand for the public transportation service are calculated using the image processing. Results: The derived demand characteristics allow not only an estimation of the magnitude of traffic streams in public transportation but also their qualitative description. Such an approach permits a flexible design of the transportation offer to adapt to the demand. This allows matching the timetables to the density functions describing the demand for public transportation within the space of transportation networks. In addition, based on the results of this type of research, a public transportation operator may despatch the vehicle base in a flexible way. For each run of a bus or tram fleet, basing on the registered passenger traffic streams, it is possible to rationally despatch the vehicles with suitable capacity. Conclusions: A system of this type is capable of determining the quality of work of the public transportation. With the ITS systems being introduced still more widely, the proposed methodology allows the design and implementation of dynamic timetables.

  7. Demonstration of fleet trucks fueled with PV hydrogen

    International Nuclear Information System (INIS)

    Provenzano, J.; Scott, P.B.; Zweig, R.

    1998-01-01

    The Clean Air Now (CAN) Solar Hydrogen Project has been installed at the Xerox Corporation, El Segundo, California site. Three Ford Ranger trucks have been converted to use hydrogen fuel. The ''stand- alone'' electrolyzer and hydrogen dispensing system is powered by a photovoltaic array with no connection to the power grid. A variable frequency DC/AC converter steps up the voltage to drive the 15 hp motor for the hydrogen compressor. Up to 400 standard cubic meters (SCM) of solar hydrogen is stored, and storage of up to 2300 SCM of commercial hydrogen is collocated. As the hydrogen storage is within 5km of Los Angeles International Airport, pilot operation of a hydrogen fuel cell bus for airport shuttle service has been demonstrated with fueling at the CAN facility. The truck engine conversions are bored to 2.91 displacement, use a Roots type supercharger and CVI (constant volume injection) fuel induction to allow performance similar to that of the gasoline powered truck. Truck fuel storage is done with carbon composite tanks at pressures up to 24.8 MPa (3600 psi). Two tanks are located just behind the driver's cab, and take up nearly half of the truck bed space. The truck highway range is approximately 140 miles. The engine operates in lean burn mode, with nil emissions of CO and HC. NO x emissions vary with load and rpm in the range from 10 to 100 ppm, yielding total emissions at a small fraction of the ULEV standard. Two Xerox fleet trucks have been converted, and one for the City of West Hollywood. The Clean Air Now Program demonstrates that hydrogen powered fleet development is an appropriate safe, and effective strategy for improvement of urban air quality. It further demonstrates that continued technological development and cost reduction will make such implementation competitive. (Author)

  8. ENERGY EFFICIENCY AS A CRITERION IN THE VEHICLE FLEET MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Davor Vujanović

    2010-01-01

    Full Text Available Transport represents an industry sector with intense energy consumption, the road transport sector within is the dominant subsector. The objective of the research presented in this paper is in defining the activities which applied within road freight transport companies contribute to enhancing vehicles' energy efficiency. Vehicle fleet operation management process effects on fuel consumption decrease have been looked into. Operation parameters that influence vehicle fuel consumption were analysed. In this sense, a survey has been realised in order to evaluate the vehicle load factor impact on the specific fuel consumption. Measures for enhancing vehicle's logistics efficiency have been defined. As a tool for those measures' implementation an algorithm for vehicle fleet operation management was developed which represented a basis for a dedicated software package development for vehicle dispatching process decision support. A set of measures has been recommended and their effects in fuel savings were evaluated.

  9. Remote handling and accelerators

    International Nuclear Information System (INIS)

    Wilson, M.T.

    1983-01-01

    The high-current levels of contemporary and proposed accelerator facilities induce radiation levels into components, requiring consideration be given to maintenance techniques that reduce personnel exposure. Typical components involved include beamstops, targets, collimators, windows, and instrumentation that intercepts the direct beam. Also included are beam extraction, injection, splitting, and kicking regions, as well as purposeful spill areas where beam tails are trimmed and neutral particles are deposited. Scattered beam and secondary particles activate components all along a beamline such as vacuum pipes, magnets, and shielding. Maintenance techniques vary from hands-on to TV-viewed operation using state-of-the-art servomanipulators. Bottom- or side-entry casks are used with thimble-type target and diagnostic assemblies. Long-handled tools are operated from behind shadow shields. Swinging shield doors, unstacking block, and horizontally rolling shield roofs are all used to provide access. Common to all techniques is the need to make operations simple and to provide a means of seeing and reaching the area

  10. Testing of FFTF fuel handling equipment

    International Nuclear Information System (INIS)

    Coleman, D.W.; Grazzini, E.D.; Hill, L.F.

    1977-07-01

    The Fast Flux Test Facility has several manual/computer controlled fuel handling machines which are exposed to severe environments during plant operation but still must operate reliably when called upon for reactor refueling. The test programs for two such machines--the Closed Loop Ex-Vessel Machine and the In-Vessel Handling Machine--are described. The discussion centers on those areas where design corrections or equipment repairs substantiated the benefits of a test program prior to plant operation

  11. New Trends in Robotics for Agriculture: Integration and Assessment of a Real Fleet of Robots

    Science.gov (United States)

    Gonzalez-de-Soto, Mariano; Pajares, Gonzalo

    2014-01-01

    Computer-based sensors and actuators such as global positioning systems, machine vision, and laser-based sensors have progressively been incorporated into mobile robots with the aim of configuring autonomous systems capable of shifting operator activities in agricultural tasks. However, the incorporation of many electronic systems into a robot impairs its reliability and increases its cost. Hardware minimization, as well as software minimization and ease of integration, is essential to obtain feasible robotic systems. A step forward in the application of automatic equipment in agriculture is the use of fleets of robots, in which a number of specialized robots collaborate to accomplish one or several agricultural tasks. This paper strives to develop a system architecture for both individual robots and robots working in fleets to improve reliability, decrease complexity and costs, and permit the integration of software from different developers. Several solutions are studied, from a fully distributed to a whole integrated architecture in which a central computer runs all processes. This work also studies diverse topologies for controlling fleets of robots and advances other prospective topologies. The architecture presented in this paper is being successfully applied in the RHEA fleet, which comprises three ground mobile units based on a commercial tractor chassis. PMID:25143976

  12. New Trends in Robotics for Agriculture: Integration and Assessment of a Real Fleet of Robots

    Directory of Open Access Journals (Sweden)

    Luis Emmi

    2014-01-01

    Full Text Available Computer-based sensors and actuators such as global positioning systems, machine vision, and laser-based sensors have progressively been incorporated into mobile robots with the aim of configuring autonomous systems capable of shifting operator activities in agricultural tasks. However, the incorporation of many electronic systems into a robot impairs its reliability and increases its cost. Hardware minimization, as well as software minimization and ease of integration, is essential to obtain feasible robotic systems. A step forward in the application of automatic equipment in agriculture is the use of fleets of robots, in which a number of specialized robots collaborate to accomplish one or several agricultural tasks. This paper strives to develop a system architecture for both individual robots and robots working in fleets to improve reliability, decrease complexity and costs, and permit the integration of software from different developers. Several solutions are studied, from a fully distributed to a whole integrated architecture in which a central computer runs all processes. This work also studies diverse topologies for controlling fleets of robots and advances other prospective topologies. The architecture presented in this paper is being successfully applied in the RHEA fleet, which comprises three ground mobile units based on a commercial tractor chassis.

  13. New trends in robotics for agriculture: integration and assessment of a real fleet of robots.

    Science.gov (United States)

    Emmi, Luis; Gonzalez-de-Soto, Mariano; Pajares, Gonzalo; Gonzalez-de-Santos, Pablo

    2014-01-01

    Computer-based sensors and actuators such as global positioning systems, machine vision, and laser-based sensors have progressively been incorporated into mobile robots with the aim of configuring autonomous systems capable of shifting operator activities in agricultural tasks. However, the incorporation of many electronic systems into a robot impairs its reliability and increases its cost. Hardware minimization, as well as software minimization and ease of integration, is essential to obtain feasible robotic systems. A step forward in the application of automatic equipment in agriculture is the use of fleets of robots, in which a number of specialized robots collaborate to accomplish one or several agricultural tasks. This paper strives to develop a system architecture for both individual robots and robots working in fleets to improve reliability, decrease complexity and costs, and permit the integration of software from different developers. Several solutions are studied, from a fully distributed to a whole integrated architecture in which a central computer runs all processes. This work also studies diverse topologies for controlling fleets of robots and advances other prospective topologies. The architecture presented in this paper is being successfully applied in the RHEA fleet, which comprises three ground mobile units based on a commercial tractor chassis.

  14. Fuel handling machine and auxiliary systems for a fuel handling cell

    International Nuclear Information System (INIS)

    Suikki, M.

    2013-10-01

    This working report is an update for as well as a supplement to an earlier fuel handling machine design (Kukkola and Roennqvist 2006). A focus in the earlier design proposal was primarily on the selection of a mechanical structure and operating principle for the fuel handling machine. This report introduces not only a fuel handling machine design but also auxiliary fuel handling cell equipment and its operation. An objective of the design work was to verify the operating principles of and space allocations for fuel handling cell equipment. The fuel handling machine is a remote controlled apparatus capable of handling intensely radiating fuel assemblies in the fuel handling cell of an encapsulation plant. The fuel handling cell is air tight space radiation-shielded with massive concrete walls. The fuel handling machine is based on a bridge crane capable of traveling in the handling cell along wall tracks. The bridge crane has its carriage provided with a carousel type turntable having mounted thereon both fixed and telescopic masts. The fixed mast has a gripper movable on linear guides for the transfer of fuel assemblies. The telescopic mast has a manipulator arm capable of maneuvering equipment present in the fuel handling cell, as well as conducting necessary maintenance and cleaning operations or rectifying possible fault conditions. The auxiliary fuel handling cell systems consist of several subsystems. The subsystems include a service manipulator, a tool carrier for manipulators, a material hatch, assisting winches, a vacuum cleaner, as well as a hose reel. With the exception of the vacuum cleaner, the devices included in the fuel handling cell's auxiliary system are only used when the actual encapsulation process is not ongoing. The malfunctions of mechanisms or actuators responsible for the motion actions of a fuel handling machine preclude in a worst case scenario the bringing of the fuel handling cell and related systems to a condition appropriate for

  15. Fuel handling machine and auxiliary systems for a fuel handling cell

    Energy Technology Data Exchange (ETDEWEB)

    Suikki, M. [Optimik Oy, Turku (Finland)

    2013-10-15

    This working report is an update for as well as a supplement to an earlier fuel handling machine design (Kukkola and Roennqvist 2006). A focus in the earlier design proposal was primarily on the selection of a mechanical structure and operating principle for the fuel handling machine. This report introduces not only a fuel handling machine design but also auxiliary fuel handling cell equipment and its operation. An objective of the design work was to verify the operating principles of and space allocations for fuel handling cell equipment. The fuel handling machine is a remote controlled apparatus capable of handling intensely radiating fuel assemblies in the fuel handling cell of an encapsulation plant. The fuel handling cell is air tight space radiation-shielded with massive concrete walls. The fuel handling machine is based on a bridge crane capable of traveling in the handling cell along wall tracks. The bridge crane has its carriage provided with a carousel type turntable having mounted thereon both fixed and telescopic masts. The fixed mast has a gripper movable on linear guides for the transfer of fuel assemblies. The telescopic mast has a manipulator arm capable of maneuvering equipment present in the fuel handling cell, as well as conducting necessary maintenance and cleaning operations or rectifying possible fault conditions. The auxiliary fuel handling cell systems consist of several subsystems. The subsystems include a service manipulator, a tool carrier for manipulators, a material hatch, assisting winches, a vacuum cleaner, as well as a hose reel. With the exception of the vacuum cleaner, the devices included in the fuel handling cell's auxiliary system are only used when the actual encapsulation process is not ongoing. The malfunctions of mechanisms or actuators responsible for the motion actions of a fuel handling machine preclude in a worst case scenario the bringing of the fuel handling cell and related systems to a condition appropriate for

  16. Preoperational checkout of the remote-handled transuranic waste handling at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1987-09-01

    This plan describes the preoperational checkout for handling Remote-Handled Transuranic (RH-TRU) Wastes from their receipt at the Waste Isolation Pilot Plant (WIPP) to their emplacement underground. This plan identifies the handling operations to be performed, personnel groups responsible for executing these operations, and required equipment items. In addition, this plan describes the quality assurance that will be exercised throughout the checkout, and finally, it establishes criteria by which to measure the success of the checkout. 7 refs., 5 figs

  17. Natural gas: Fuel for urban fleets

    International Nuclear Information System (INIS)

    Mariani, F.

    1992-01-01

    The search for new ecological solutions for public transport has given an important role to natural gas for vehicles in the national context. Under current prices of fuel and costs of plants, the management of a bus fleet running on natural gas allows consistent savings, besides reducing the atmospheric pollution of urban centres. Within this context, solutions offered by current technology available on the market are examined. Low polluting emissions are taken into consideration and a complete analysis of costs and savings is reported. Reference is made to the Thermie European programme which calls for fuel diversification, energy conservation and air pollution abatement

  18. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-04-23

    ...; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department of... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of the...

  19. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-10-29

    ...; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department... previously approved information collection requirement concerning contractor use of interagency fleet... comments identified by Information Collection 9000- 0032, Contractor Use of Interagency Fleet Management...

  20. Handle with care

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-03-15

    Full text: A film dealing with transport of radioactive materials by everyday means - rail, road, sea and air transport - has been made for IAEA. It illustrates in broad terms some of the simple precautions which should be followed by persons dealing with such materials during shipment. Throughout, the picture stresses the transport regulations drawn up and recommended by the Agency, and in particular the need to carry out carefully the instructions based on these regulations in order to ensure that there is no hazard to the public nor to those who handle radioactive materials in transit and storage. In straightforward language, the film addresses the porter of a goods wagon, an airline cargo clerk, a dockside crane operator, a truck driver and others who load and ship freight. It shows the various types of package used to contain different categories of radioactive substances according to the intensity of the radiation emitted. It also illustrates their robustness by a series of tests involving drops, fires, impact, crushing, etc. Clear instructions are conveyed on what to do in the event of an unlikely accident with any type of package. The film is entitled, 'The Safe Transport of Radioactive Materials', and is No. 3 in the series entitled, 'Handle with Care'. It was made for IAEA through the United Kingdom Atomic Energy Authority by the Film Producers' Guild in the United Kingdom. It is in 16 mm colour, optical sound, with a running time of 20 minutes. It is available for order at $50 either direct from IAEA or through any of its Member Governments. Prints can be supplied in English, French, Russian or Spanish. Copies are also available for adaptation for commentaries in other languages. (author)

  1. Economics of symbiotic nuclear fleets at equilibrium

    International Nuclear Information System (INIS)

    Bidaud, Adrien; Guillemin, P.; Lecarpentier, David

    2008-01-01

    Many decades of industrial experience have proven that thermal reactors are able to provide a safe, reliable and competitive source of electricity. The higher construction costs of fast reactors compared to thermal reactors could be compensated by their better use of fissile material during the probable fast development of nuclear energy in the first half of the century. Thus, despite the over-cost of their cores, on the longer term, fast reactors are expected to take the lead in the nuclear reactor race. In the mean term, multi-strata symbiotic parks, using high conversion-rate thermal reactors, may delay fast reactor start up. We compare projected fuel cycle costs and cost of electricity of various symbiotic nuclear fleets, on the basis of a simple economic model and elementary costs estimated on publicly available data. These parameters and their evolution over reactor-life time scale can hardly be estimated. That is why we look at the sensitivities of our results to large modifications of the input parameters. The aim of our simple economic model is to understand which reactor characteristics should be optimized to enhance their economic performance when working as a single symbiotic fleet. (authors)

  2. Safe Handling of Radioisotopes

    International Nuclear Information System (INIS)

    1958-01-01

    Under its Statute the International Atomic Energy Agency is empowered to provide for the application of standards of safety for protection against radiation to its own operations and to operations making use of assistance provided by it or with which it is otherwise directly associated. To this end authorities receiving such assistance are required to observe relevant health and safety measures prescribed by the Agency. As a first step, it has been considered an urgent task to provide users of radioisotopes with a manual of practice for the safe handling of these substances. Such a manual is presented here and represents the first of a series of manuals and codes to be issued by the Agency. It has been prepared after careful consideration of existing national and international codes of radiation safety, by a group of international experts and in consultation with other international bodies. At the same time it is recommended that the manual be taken into account as a basic reference document by Member States of the Agency in the preparation of national health and safety documents covering the use of radioisotopes.

  3. Expanding the Telepresence Paradigm to the UNOLS Fleet

    Science.gov (United States)

    Coleman, D.; Scowcroft, G.

    2014-12-01

    The Inner Space Center (ISC) at the University of Rhode Island Graduate School of Oceanography (URI-GSO) has been at the forefront of developing the tools, techniques, and protocols for telepresence-enabled ocean science exploration and education programs. Working primarily with the Ocean Exploration Trust's E/V Nautilus and the NOAA Ship Okeanos Explorer, the ISC facility and staff have supported dozens of research cruises with significant shore-based support, while delivering related educational programming across the globe. Through a partnership with the University National Oceanographic Laboratory System (UNOLS), the ISC is broadening its reach and capabilities to serve vessels in the U.S. academic research fleet, managed by UNOLS. The ISC has developed and used a portable shipboard "mobile telepresence unit" (MTU) on several UNOLS ships to support projects led by ocean scientists that employed the telepresence paradigm as part of their research and outreach programs. Utilizing the ISC facilities provides opportunities for effective, successful broader impact activities and shore-based remote science connectivity. With new UNOLS ships coming online, including the R/V Sikuliaq, the R/V Neil Armstrong, and the R/V Sally Ride, in addition to future Regional Class Research Vessels (RCRVs), telepresence capability has become a technical requirement for a variety of reasons. Older vessels are being retrofit with this forward-looking technology, and URI's research vessel, the R/V Endeavor, has been recently configured with technology to support telepresence operations. This presentation will provide an overview of the future of telepresence technology, its use in ocean science research and education, and advantages for using this capability to support broader impact activities. In addition, ISC successes, challenges, and lessons learned in employing telepresence technologies and methodologies onboard the academic research fleet will be discussed.

  4. CCS Retrofit: Analysis of the Global Installed Power Plant Fleet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    Electricity generation from coal is still growing rapidly and energy scenarios from the IEA expect a possible increase from today’s 1 600 GW of coal-fired power plants to over 2 600 GW until 2035. This trend will increase the lock-in of carbon intensive electricity sources, while IEA assessments show that two-thirds of total abatement from all sectors should come from the power sector alone to support a least-cost abatement strategy. Since coal-fired power plants have a fairly long lifetime, and in order to meet climate constraints, there is a need either to apply CCS retrofit to some of today’s installed coal-fired power plants once the technology becomes available. Another option would be to retire some plants before the end of their lifetime. This working paper discusses criteria relevant to differentiating between the technical, cost-effective and realistic potential for CCS retrofit. The paper then discusses today’s coal-fired power plant fleet from a statistical perspective, by looking at age, size and the expected performance of today’s plant across several countries. The working paper also highlights the growing demand for applying CCS retrofitting to the coal-fired power plant fleet of the future. In doing so this paper aims at emphasising the need for policy makers, innovators and power plant operators to quickly complete the development of the CCS technology and to identify key countries where retrofit applications will have the biggest extent and impact.

  5. Electric vehicle fleet management in smart grids: A review of services, optimization and control aspects

    DEFF Research Database (Denmark)

    Hu, Junjie; Morais, Hugo; Sousa, Tiago

    2016-01-01

    Electric vehicles can become integral parts of a smart grid, since they are capable of providing valuable services to power systems other than just consuming power. On the transmission system level, electric vehicles are regarded as an important means of balancing the intermittent renewable energy...... resources such as wind power. This is because electric vehicles can be used to absorb the energy during the period of high electricity penetration and feed the electricity back into the grid when the demand is high or in situations of insufficient electricity generation. However, on the distribution system...... and industries. This paper presents a review and classification of methods for smart charging (including power to vehicle and vehicle-to-grid) of electric vehicles for fleet operators. The study firstly presents service relationships between fleet operators and other four actors in smart grids; then, modeling...

  6. Hydraulic Hybrid Fleet Vehicle Testing | Transportation Research | NREL

    Science.gov (United States)

    Hydraulic Hybrid Fleet Vehicle Evaluations Hydraulic Hybrid Fleet Vehicle Evaluations How Hydraulic Hybrid Vehicles Work Hydraulic hybrid systems can capture up to 70% of the kinetic energy that would -pressure reservoir to a high-pressure accumulator. When the vehicle accelerates, fluid in the high-pressure

  7. Uncertainty in Fleet Renewal: A Case from Maritime Transportation

    DEFF Research Database (Denmark)

    Pantuso, Giovanni; Fagerholt, Kjetil; Wallace, Stein W.

    2016-01-01

    This paper addresses the fleet renewal problem and particularly the treatment of uncertainty in the maritime case. A stochastic programming model for the maritime fleet renewal problem is presented. The main contribution is that of assessing whether or not better decisions can be achieved by using...

  8. Application of a greedy algorithm to military aircraft fleet retirements

    NARCIS (Netherlands)

    Newcamp, J.M.; Verhagen, W.J.C.; Udluft, H.; Curran, Ricky

    2017-01-01

    This article presents a retirement analysis model for aircraft fleets. By employing a greedy algorithm, the presented solution is capable of identifying individually weak assets in a fleet of aircraft with inhomogeneous historical utilization. The model forecasts future retirement scenarios

  9. A road safety performance indicator for vehicle fleet compatibility.

    NARCIS (Netherlands)

    Christoph, M. Vis, M.A. Rackliff, L. & Stipdonk, H.

    2013-01-01

    This paper discusses the development and the application of a safety performance indicator which measures the intrinsic safety of a country's vehicle fleet related to fleet composition. The indicator takes into account both the ‘relative severity’ of individual collisions between different vehicle

  10. Strategic vehicle fleet management - the make or buy problem

    Directory of Open Access Journals (Sweden)

    Adam Redmer

    2014-06-01

    Full Text Available Background: Fleets constitute the most important production means in transportation. Their appropriate management is crucial for all companies having transportation duties. The paper is the first one of a series of three papers that the author dedicates to the strategic vehicle fleet management topic. Methods: The paper discusses ways of fulfilling company's transportation needs (MAKE-or-BUY problem. It means the choice between using company's own and outside fleet (buying transportation services in a market. The essence of the MAKE-or-BUY problem lies in a time dependency, a seasonal nature of transportation needs. It leads to the MAKE-and-BUY solutions including utilization of both in-house and outside fleets. In the paper an original mathematical model (an optimization method allowing for the MAKE-and-BUY analysis is proposed. Results: An application of the proposed optimization method in a real-life decision situation (the case study within the Polish environment and the obtained solution are presented. The solution shows a low economic justification for using the MAKE option in practice. Especially when a fleet composed of brand new vehicles is considered. Conclusions: The paper will be continued in two further papers dedicated to strategic vehicle fleet management problems including fleet sizing / composition and fleet replacement.

  11. Plug-In Electric Vehicle Handbook for Fleet Managers (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2012-04-01

    Plug-in electric vehicles (PEVs) are entering the automobile market and are viable alternatives to conventional vehicles. This guide for fleet managers describes the basics of PEV technology, PEV benefits for fleets, how to select the right PEV, charging a PEV, and PEV maintenance.

  12. The Fleet Numerical Meteorology and Oceanography Center (FNMOC) - Naval

    Science.gov (United States)

    Meteorology Oceanography Ice You are here: Home › FNMOC FNMOC Logo FNMOC Navigation Meteorology Products Oceanography Products Tropical Applications Climatology and Archived Data Info The Fleet Numerical Meteorology and Oceanography Center (FNMOC) The Fleet Numerical Meteorology and Oceanography Center (FNMOC

  13. Realtime graphics support for remote handling operations in complex working environments within the framework of a control, simulation and off-line programming system

    International Nuclear Information System (INIS)

    Kuehnapfel, U.

    1992-05-01

    The application independent simulation system KISMET was developed. This tool gives a different approach compared to previously existing robot simulators. A hierarchical data structure approach is used for the definition of workcell geometry, assembly topology and mechanism kinematics. This database structure allows for presentation of interactively selectable levels of detail and is, therefore, especially useful for real-time rigid body simulation of complex RH-scenarios. With KISMET, assembly structures can be modelled in any number of detail levels. Workcell geometry, assembly topology and mechanisms can be defined interactively by means of the integrated modeller. The mechanism simulation allows for kinematical tree structures with any number of joints, planar closed chains, and interconnections between joints. Examples of novel simulation methods, data structures, and algorithms are presented for selected examples: the hidden surface problem, graphical presentation techniques, collision testing, and control of scene cameras (image simulation, fast positioning and tracking). Special attention is paid to the real-time problem. The way this system was realized within the UNIX world is shown as an example for geometric and kinematic modelling techniques that grant for the optimum use of the capabilities of high-performance graphics workstations. A further chapter is focussing on the use of standard interfaces for CAD model transfer (CAD * I, STEP) and robot programming (IRDATA). Examples of practical KISMET applications for remote handling in fusion reactors, in a nuclear fuel element reprocessing cell and in sensor based robotics are used to present the developed methods. (orig.) [de

  14. Travelling cranes for heavy reactor component handling

    International Nuclear Information System (INIS)

    Champeil, M.

    1977-01-01

    Structure and operating machinery of two travelling cranes (600 t and 450 t) used in the Framatome factory for handling heavy reactor components are described. When coupled, these cranes can lift loads up to 1000 t [fr

  15. Data handling systems and methods of wiring

    International Nuclear Information System (INIS)

    Grant, J.

    1981-01-01

    An improved data handling system, for monitoring and control of nuclear reactor operations, is described in which time delays associated with scanning are reduced and noise and fault signals in the system are resolved. (U.K.)

  16. Operation and handling of a mobile robot with tricycle structure; Operacion y maniobrabilidad de un robot movil con estructura de triciclo

    Energy Technology Data Exchange (ETDEWEB)

    Segovia de los Rios, J.A. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    2003-07-01

    In this article the main cares that are for the appropriate operation of a designed mobile robot and built for the transport of radioactive materials are reported. In a same way, it is shown that the maneuverability of the vehicle is adapted for its tele operation in the atmospheres for where the irradiated charge should be made circulate, using for it the controls that have been designated of a remote control of general use. (Author)

  17. Saildrone fleet could help replace aging buoys

    Science.gov (United States)

    Voosen, Paul

    2018-03-01

    In April, two semiautonomous drones, developed by Saildrone, a marine tech startup based in Alameda, California, in close collaboration with the National Oceanic and Atmospheric Administration in Washington, D.C., are set to return from an 8-month tour of the Pacific Ocean. This the first scientific test for the drones, which are powered only by the wind and sun, in the Pacific Ocean. The voyage is an important step in showing that such drones, carrying 15 different sensors, could help replace an aging and expensive array of buoys that are the main way scientists sniff out signs of climate-disrupting El Niño events. If successful, scientists envision fleets of similar drones spreading across the ocean, inviting thoughts of what it could be like to do oceanography without a ship.

  18. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Sleeping Bear Dunes National Lakeshore

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Idaho National Lab. (INL), Idaho Falls, ID (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-11-01

    This report focuses on the Sleeping Bear Dunes National Lakeshore (SLBE) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

  19. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for Department of Veterans Affairs – VA Manhattan Campus

    Energy Technology Data Exchange (ETDEWEB)

    Stephen Schey; Jim Francfort

    2014-10-01

    This report focuses on the Department of Veterans Affairs, VA Manhattan Campus (VA- Manhattan) fleet to identify the daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support successful introduction of plug-in electric vehicles (PEVs) into the agency’s fleet. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively called PEVs) can fulfill the mission requirements.

  20. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for Department of Health and Human Services – ASPR

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Steve [Idaho National Lab. (INL), Idaho Falls, ID (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-06-01

    This report focuses on the Department of Health and Human Services, Assistant Secretary for Preparedness and Response fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agency’s fleet. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.

  1. How to Handle Abuse

    Science.gov (United States)

    ... Handle Abuse KidsHealth / For Kids / How to Handle Abuse What's in this article? Tell Right Away How Do You Know Something Is Abuse? ... babysitter, teacher, coach, or a bigger kid. Child abuse can happen anywhere — at ... building. Tell Right Away A kid who is being seriously hurt ...

  2. Grain Handling and Storage.

    Science.gov (United States)

    Harris, Troy G.; Minor, John

    This text for a secondary- or postecondary-level course in grain handling and storage contains ten chapters. Chapter titles are (1) Introduction to Grain Handling and Storage, (2) Elevator Safety, (3) Grain Grading and Seed Identification, (4) Moisture Control, (5) Insect and Rodent Control, (6) Grain Inventory Control, (7) Elevator Maintenance,…

  3. TFTR tritium handling concepts

    International Nuclear Information System (INIS)

    Garber, H.J.

    1976-01-01

    The Tokamak Fusion Test Reactor, to be located on the Princeton Forrestal Campus, is expected to operate with 1 to 2.5 MA tritium--deuterium plasmas, with the pulses involving injection of 50 to 150 Ci (5 to 16 mg) of tritium. Attainment of fusion conditions is based on generation of an approximately 1 keV tritium plasma by ohmic heating and conversion to a moderately hot tritium--deuterium ion plasma by injection of a ''preheating'' deuterium neutral beam (40 to 80 keV), followed by injection of a ''reacting'' beam of high energy neutral deuterium (120 to 150 keV). Additionally, compressions accompany the beam injections. Environmental, safety and cost considerations led to the decision to limit the amount of tritium gas on-site to that required for an experiment, maintaining all other tritium in ''solidified'' form. The form of the tritium supply is as uranium tritide, while the spent tritium and other hydrogen isotopes are getter-trapped by zirconium--aluminum alloy. The issues treated include: (1) design concepts for the tritium generator and its purification, dispensing, replenishment, containment, and containment--cleanup systems; (2) features of the spent plasma trapping system, particularly the regenerable absorption cartridges, their integration into the vacuum system, and the handling of non-getterables; (3) tritium permeation through the equipment and the anticipated releases to the environment; (4) overview of the tritium related ventilation systems; and (5) design bases for the facility's tritium clean-up systems

  4. Welding method by remote handling

    International Nuclear Information System (INIS)

    Hashinokuchi, Minoru.

    1994-01-01

    Water is charged into a pit (or a water reservoir) and an article to be welded is placed on a support in the pit by remote handling. A steel plate is disposed so as to cover the article to be welded by remote handling. The welding device is positioned to the portion to be welded and fixed in a state where the article to be welded is shielded from radiation by water and the steel plate. Water in the pit is drained till the portion to be welded is exposed to the atmosphere. Then, welding is conducted. After completion of the welding, water is charged again to the pit and the welding device and fixing jigs are decomposed in a state where the article to be welded is shielded again from radiation by water and the steel plate. Subsequently, the steel plate is removed by remote handling. Then, the article to be welded is returned from the pit to a temporary placing pool by remote handling. This can reduce operator's exposure. Further, since the amount of the shielding materials can be minimized, the amount of radioactive wastes can be decreased. (I.N.)

  5. Map based localization to assist commercial fleet operations.

    Science.gov (United States)

    2014-08-01

    This report outlines key recent contributions to the state of the art in lane detection, lane departure warning, : and map-based sensor fusion algorithms. These key studies are used as a basis for a discussion about the : limitations of systems that ...

  6. TQL, A Case Study of Implementation into the Operational Fleet

    Science.gov (United States)

    1992-06-18

    Methods, Poka - Yoke (mistake proofing of a process), Total Preventive Maintenance, and Group Technology and Quality Circles. All of these methods can be...Thomas, What Every Manager Should Know About Quality, 1991, Marcel Dekker,inc. 9. Poka - Yoke , 1987, Productivity Press. 67 B. STATISTICAL METHODS: 1

  7. Handling of multiassembly sealed baskets between reactor storage and a remote handling facility

    International Nuclear Information System (INIS)

    Massey, J.V.; Kessler, J.H.; McSherry, A.J.

    1989-06-01

    The storage of multiple fuel assemblies in sealed (welded) dry storage baskets is gaining increasing use to augment at-reactor fuel storage capacity. Since this increasing use will place a significant number of such baskets on reactor sites, some initial downstream planning for their future handling scenarios for retrieving multi-assembly sealed baskets (MSBs) from onsite storage and transferring and shipping the fuel (and/or the baskets) to a federally operated remote handling facility (RHF). Numerous options or at-reactor and away-from-reactor handling were investigated. Materials handling flowsheets were developed along with conceptual designs for the equipment and tools required to handle and open the MSBs. The handling options were evaluated and compared to a reference case, fuel handling sequence (i.e., fuel assemblies are taken from the fuel pool, shipped to a receiving and handling facility and placed into interim storage). The main parameters analyzed are throughout, radiation dose burden and cost. In addition to evaluating the handling of MSBs, this work also evaluated handling consolidated fuel canisters (CFCs). In summary, the handling of MSBs and CFCs in the store, ship and bury fuel cycle was found to be feasible and, under some conditions, to offer significant benefits in terms of throughput, cost and safety. 14 refs., 20 figs., 24 tabs

  8. Unvented Drum Handling Plan

    International Nuclear Information System (INIS)

    MCDONALD, K.M.

    2000-01-01

    This drum-handling plan proposes a method to deal with unvented transuranic drums encountered during retrieval of drums. Finding unvented drums during retrieval activities was expected, as identified in the Transuranic (TRU) Phase I Retrieval Plan (HNF-4781). However, significant numbers of unvented drums were not expected until excavation of buried drums began. This plan represents accelerated planning for management of unvented drums. A plan is proposed that manages unvented drums differently based on three categories. The first category of drums is any that visually appear to be pressurized. These will be vented immediately, using either the Hanford Fire Department Hazardous Materials (Haz. Mat.) team, if such are encountered before the facilities' capabilities are established, or using internal capabilities, once established. To date, no drums have been retrieved that showed signs of pressurization. The second category consists of drums that contain a minimal amount of Pu isotopes. This minimal amount is typically less than 1 gram of Pu, but may be waste-stream dependent. Drums in this category are assayed to determine if they are low-level waste (LLW). LLW drums are typically disposed of without venting. Any unvented drums that assay as TRU will be staged for a future venting campaign, using appropriate safety precautions in their handling. The third category of drums is those for which records show larger amounts of Pu isotopes (typically greater than or equal to 1 gram of Pu). These are assumed to be TRU and are not assayed at this point, but are staged for a future venting campaign. Any of these drums that do not have a visible venting device will be staged awaiting venting, and will be managed under appropriate controls, including covering the drums to protect from direct solar exposure, minimizing of container movement, and placement of a barrier to restrict vehicle access. There are a number of equipment options available to perform the venting. The

  9. Functional Quality Criterion of Rock Handling Mechanization at Open-pit Mines

    Directory of Open Access Journals (Sweden)

    Voronov Yuri

    2017-01-01

    Full Text Available Overburden and mining operations at open-pit mines are performed mainly by powerful shovel-truck systems (STSs. One of the main problems of the STSs is a rather low level of their operating quality, mainly due to unjustified over-trucking. In this article, a functional criterion for assessing the qualify of the STS operation at open-pit mines is formulated, derived and analyzed. We introduce the rationale and general principles for the functional criterion formation, its general form, as well as variations for various STS structures: a mixed truck fleet and a homogeneous shovel fleet, a mixed shove! fleet and a homogeneous truck fleet, mixed truck and shovel fleets. The possibility of assessing the quality of the STS operation is of great importance for identifying the main directions for improving their operational performance and operating quality, optimizing the main performance indicators by the qualify criterion, and. as a result, for possible saving of material and technical resources for open-pit mining. Improvement of the quality of the STS operation also allows increasing the mining safety and decreasing the atmosphere pollution - by means of possible reducing of the number of the operating trucks.

  10. Functional Quality Criterion of Rock Handling Mechanization at Open-pit Mines

    Science.gov (United States)

    Voronov, Yuri; Voronov, Artyoni

    2017-11-01

    Overburden and mining operations at open-pit mines are performed mainly by powerful shovel-truck systems (STSs). One of the main problems of the STSs is a rather low level of their operating quality, mainly due to unjustified over-trucking. In this article, a functional criterion for assessing the qualify of the STS operation at open-pit mines is formulated, derived and analyzed. We introduce the rationale and general principles for the functional criterion formation, its general form, as well as variations for various STS structures: a mixed truck fleet and a homogeneous shovel fleet, a mixed shove! fleet and a homogeneous truck fleet, mixed truck and shovel fleets. The possibility of assessing the quality of the STS operation is of great importance for identifying the main directions for improving their operational performance and operating quality, optimizing the main performance indicators by the qualify criterion, and. as a result, for possible saving of material and technical resources for open-pit mining. Improvement of the quality of the STS operation also allows increasing the mining safety and decreasing the atmosphere pollution - by means of possible reducing of the number of the operating trucks.

  11. CEP action area studies : City of Yellowknife fleet review

    International Nuclear Information System (INIS)

    2006-01-01

    The City of Yellowknife maintains a fleet of vehicles and equipment used for public service. Yellowknife's Community Energy Plan (CEP) has a goal to reduce Yellowknife's fleet fuel consumption and greenhouse gas (GHG) emissions by 20 per cent within 10 years. This report examined current fuel consumption for the City of Yellowknife's fleet based on available data and examined options to reduce fleet fuel consumption. It also quantified the reduction in fuel consumption, GHG emissions, as well as the financial impacts of various options. An overview of the City of Yellowknife's fleet of vehicles and equipment was first provided, as well as calculated annual values for fuel consumption, GHG emissions, and energy consumption for the City of Yellowknife's fleet. Two fleet management case studies were presented. Fuel-efficient vehicles on the market that could provide an opportunity to replace some of the City of Yellowknife's fleet of light vehicles, and bylaw vehicles with fuel-efficient vehicles were discussed. These vehicles include hybrid vehicles, smart cars, compressed natural gas vehicles, and compressed-air vehicles. Equipment maintenance for tires, preventive, synthetic oils, and driver training programs were discussed. Anti-idling campaigns and technologies were also examined. The report concluded with a discussion of renewable fuels such as biodiesel and ethanol blended gasoline. Fleet fuel consumption, GHG and financial impacts were provided for each chapter heading. It was concluded that if all of the measures identified in the report were implemented, an overall decrease in GHG emissions of approximately 15 per cent would be achieved. 15 refs., 8 tabs., 8 figs

  12. Remotely handled and remotely operated valve, particularly for the hot part of radioactive plants. Fernhantierbare und fernbedienbare Armatur, insbesondere fuer den heissen Bereich radioaktiver Anlagen

    Energy Technology Data Exchange (ETDEWEB)

    Radovan, G.; Sandling, M.J.; Davidson, J.W.; Blaseck, K.; Hoffmeister, L.; Westendorf, H.

    1988-01-21

    The valve consists of a valve whose valve housing is built into a pipeline. The wear parts of the valve to be replaced, such as the valve body and valve seat, are combined into a replacement part. The replacement part and a clamp act together so that the replacement part is interlocked with the valve housing in the closed operating position. The exchange can be made by undoing a single central screw.

  13. Recommendations for cask features for robotic handling from the Advanced Handling Technology Project

    International Nuclear Information System (INIS)

    Drotning, W.

    1991-02-01

    This report describes the current status and recent progress in the Advanced Handling Technology Project (AHTP) initiated to explore the use of advanced robotic systems and handling technologies to perform automated cask handling operations at radioactive waste handling facilities, and to provide guidance to cask designers on the impact of robotic handling on cask design. Current AHTP tasks have developed system mock-ups to investigate robotic manipulation of impact limiters and cask tiedowns. In addition, cask uprighting and transport, using computer control of a bridge crane and robot, were performed to demonstrate the high speed cask transport operation possible under computer control. All of the current AHTP tasks involving manipulation of impact limiters and tiedowns require robotic operations using a torque wrench. To perform these operations, a pneumatic torque wrench and control system were integrated into the tool suite and control architecture of the gantry robot. The use of captured fasteners is briefly discussed as an area where alternative cask design preferences have resulted from the influence of guidance for robotic handling vs traditional operations experience. Specific robotic handling experiences with these system mock-ups highlight a number of continually recurring design principles: (1) robotic handling feasibility is improved by mechanical designs which emphasize operation with limited dexterity in constrained workspaces; (2) clearances, tolerances, and chamfers must allow for operations under actual conditions with consideration for misalignment and imprecise fixturing; (3) successful robotic handling is enhanced by including design detail in representations for model-based control; (4) robotic handling and overall quality assurance are improved by designs which eliminate the use of loose, disassembled parts. 8 refs., 15 figs

  14. Electric bus fleet size and mix problem with optimization of charging infrastructure

    DEFF Research Database (Denmark)

    Rogge, Matthias; van der Hurk, Evelien; Larsen, Allan

    2018-01-01

    Battery electric buses are seen as a well-suited technology for the electrification of road-based public transport. However, the transition process from conventional diesel to electric buses faces major hurdles caused by range limitations and required charging times of battery buses. This work...... addresses these constraints and provides a methodology for the cost-optimized planning of depot charging battery bus fleets and their corresponding charging infrastructure. The defined problem covers the scheduling of battery buses, the fleet composition, and the optimization of charging infrastructure...... in a joint process. Vehicle schedule adjustments are monetized and evaluated together with the investment and operational costs of the bus system. The resulting total cost of ownership enables a comparison of technical alternatives on a system level, which makes this approach especially promising...

  15. Electric Vehicle Preparedness: Task 1, Assessment of Fleet Inventory for Marine Corps Base Camp Lejeune

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Idaho National Lab. (INL), Idaho Falls, ID (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-01-01

    Several U.S. Department of Defense-based studies were conducted to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). Task 1 included a survey of the inventory of non-tactical fleet vehicles at the Marine Corps Base Camp Lejeune (MCBCL) to characterize the fleet. This information and characterization will be used to select vehicles for monitoring that takes place during Task 2. This monitoring involves data logging of vehicle operation in order to identify the vehicle’s mission and travel requirements. Individual observations of these selected vehicles provide the basis for recommendations related to PEV adoption. It also identifies whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements and provides observations related to placement of PEV charging infrastructure.

  16. Preliminary assessment of fleets covered by the Energy Policy Act

    Energy Technology Data Exchange (ETDEWEB)

    Hu, P.S.; Davis, S.C.; Wang, M.Q. [and others

    1994-12-31

    To facilitate the goal of decreasing oil imports by 10 percent by the year 2000 and 30 percent by 2010, two sections of the Energy Policy Act encourage and mandate alternative fuel vehicles in the acquisition of fleet vehicles. The first step in estimating the contribution of these mandates toward meeting the aforementioned goal entails identifying affected fleets. This paper presents a preliminary assessment of potential vehicle fleet coverage. Only a limited number of companies in the methanol, ethanol, and hydrogen industries are likely to quality for this mandate. Whereas, many of the oil producers, petroleum refiners, and electricity companies are likely to be regulated.

  17. Assessment of methane-related fuels for automotive fleet vehicles: technical, supply, and economic assessments

    Energy Technology Data Exchange (ETDEWEB)

    1982-02-01

    The use of methane-related fuels, derived from a variety of sources, in highway vehicles is assessed. Methane, as used here, includes natural gas (NG) as well as synthetic natural gas (SNG). Methanol is included because it can be produced from NG or the same resources as SNG, and because it is a liquid fuel at normal ambient conditions. Technological, operational, efficiency, petroleum displacement, supply, safety, and economic issues are analyzed. In principle, both NG and methanol allow more efficient engine operation than gasoline. In practice, engines are at present rarely optimized for NG and methanol. On the basis of energy expended from resource extraction to end use, only optimized LNG vehicles are more efficient than their gasoline counterparts. By 1985, up to 16% of total petroleum-based highway vehicle fuel could be displaced by large fleets with central NG fueling depots. Excluding diesel vehicles, which need technology advances to use NG, savings of 8% are projected. Methanol use by large fleets could displace up to 8% of petroleum-based highway vehicle fuel from spark-ignition vehicles and another 9% from diesel vehicles with technology advances. The US NG supply appears adequate to accommodate fleet use. Supply projections, future price differential versus gasoline, and user economics are uncertain. In many cases, attractive paybacks can occur. Compressed NG now costs on average about $0.65 less than gasoline, per energy-equivalent gallon. Methanol supply projections, future prices, and user economics are even more uncertain. Current and projected near-term methanol supplies are far from adequate to support fleet use. Methanol presently costs more than gasoline on an equal-energy basis, but is projected to cost less if produced from coal instead of NG or petroleum.

  18. 41 CFR 101-39.104-1 - Consolidations into a fleet management system.

    Science.gov (United States)

    2010-07-01

    ... fleet management system. 101-39.104-1 Section 101-39.104-1 Public Contracts and Property Management..., TRANSPORTATION, AND MOTOR VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.1-Establishment, Modification, and Discontinuance of Interagency Fleet Management Systems § 101-39.104-1 Consolidations into a fleet management...

  19. 48 CFR 51.204 - Use of interagency fleet management system (IFMS) vehicles and related services.

    Science.gov (United States)

    2010-10-01

    ... Contractor Use of Interagency Fleet Management System (IFMS) 51.204 Use of interagency fleet management system (IFMS) vehicles and related services. Contractors authorized to use interagency fleet management... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Use of interagency fleet...

  20. 41 CFR 101-39.104 - Notice of establishment of a fleet management system.

    Science.gov (United States)

    2010-07-01

    ... of a fleet management system. 101-39.104 Section 101-39.104 Public Contracts and Property Management..., TRANSPORTATION, AND MOTOR VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.1-Establishment, Modification, and Discontinuance of Interagency Fleet Management Systems § 101-39.104 Notice of establishment of a fleet management...

  1. Automation of 3D micro object handling process

    DEFF Research Database (Denmark)

    Gegeckaite, Asta; Hansen, Hans Nørgaard

    2007-01-01

    Most of the micro objects in industrial production are handled with manual labour or in semiautomatic stations. Manual labour usually makes handling and assembly operations highly flexible, but slow, relatively imprecise and expensive. Handling of 3D micro objects poses special challenges due to ...

  2. Getting to grips with remote handling and robotics

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, D [Ontario Hydro, Toronto (Canada)

    1984-12-01

    A report on the Canadian Nuclear Society Conference on robotics and remote handling in the nuclear industry, September 1984. Remote handling in reactor operations, particularly in the Candu reactors is discussed, and the costs and benefits of use of remote handling equipment are considered. Steam generator inspection and repair is an area in which practical application of robotic technology has made a major advance.

  3. The power plant portal from handling to operation management - from control room to headquarters; Das Kraftwerksportal von der Bedienung bis zur Betriebsfuehrung - von der Warte bis zur Hauptverwaltung

    Energy Technology Data Exchange (ETDEWEB)

    Orth, J. [Produktmanagement, ABB, Mannheim (Germany); Lauxtermann, S. [Plant und Business Optimization, ABB, Minden (Germany)

    2005-07-01

    A power plant portal allows power and heat producers to make use of all the functionalities already available, while benefiting from the convenience of a consistent user interface philosophy. The system's range of functions by far exceeds the capabilities of traditional operating and monitoring systems and effectively integrates the procedures of information management, engineering and asset optimisation. Users have context-based direct access to plant- and company-wide information. A wide variety of PCS, DCS and power plant components can be monitored with the help of the integrated software modules. Asset optimisation features enable plant owners to minimise the costs of corrective and preventive maintenance measures. In addition, they support and optimise the workflow of maintenance and calibration activities. (orig.)

  4. Handling Pyrophoric Reagents

    Energy Technology Data Exchange (ETDEWEB)

    Alnajjar, Mikhail S.; Haynie, Todd O.

    2009-08-14

    Pyrophoric reagents are extremely hazardous. Special handling techniques are required to prevent contact with air and the resulting fire. This document provides several methods for working with pyrophoric reagents outside of an inert atmosphere.

  5. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  6. Ergonomics and patient handling.

    Science.gov (United States)

    McCoskey, Kelsey L

    2007-11-01

    This study aimed to describe patient-handling demands in inpatient units during a 24-hour period at a military health care facility. A 1-day total population survey described the diverse nature and impact of patient-handling tasks relative to a variety of nursing care units, patient characteristics, and transfer equipment. Productivity baselines were established based on patient dependency, physical exertion, type of transfer, and time spent performing the transfer. Descriptions of the physiological effect of transfers on staff based on patient, transfer, and staff characteristics were developed. Nursing staff response to surveys demonstrated how patient-handling demands are impacted by the staff's physical exertion and level of patient dependency. The findings of this study describe the types of transfers occurring in these inpatient units and the physical exertion and time requirements for these transfers. This description may guide selection of the most appropriate and cost-effective patient-handling equipment required for specific units and patients.

  7. Wireless GPS fleet tracking system at the University of Albany.

    Science.gov (United States)

    2014-07-01

    This report provides an overview of the project undertaken at the University at Albany to make alternative transportation a more : viable option by implementing a GPS Tracking System on the University bus fleet and broadcasting the bus locations to c...

  8. Fleet Compliance Annual Report: Model Year 2015, Fiscal Year 2016

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-12-01

    The U.S. Department of Energy (DOE) regulates covered state government and alternative fuel provider fleets, pursuant to the Energy Policy Act of 1992 (EPAct), as amended. This report details compliance for model year 2015, fiscal year 2016.

  9. Risk Management of an Aging KC-130 Fleet

    National Research Council Canada - National Science Library

    Hoffman, Paul

    1999-01-01

    .... For the aging USMC KC-130 F/R fleet, a damage-tolerant approach ensured that safety would be maintained but it presented a problem in forecasting readiness, aircraft remaining in the inventory...

  10. Sweeney Todd : Fleet Streeti deemonlik habemeajaja / Kaisa Karu

    Index Scriptorium Estoniae

    Karu, Kaisa

    2008-01-01

    Lühiarvustus õudusmuusikalile "Sweeney Todd : Fleet Streeti deemonlik habemeajaja" (Stephen Sondheimi muusikali alusel), režissöör Tim Burton : peaosades Johnny Depp, Helena Bonham Carter : Ameerika Ühendriigid - Suurbritannia 2007

  11. DVD. Sweeney Todd : Fleet Streeti deemonlik habemeajaja / Egle Loo

    Index Scriptorium Estoniae

    Loo, Egle

    2008-01-01

    Lühiarvustus õudusmuusikalist "Sweeney Todd : The Demon Barber of Fleet Street" Stephen Sondheimi muusikali alusel : režissöör Tim Burton : peaosades Johnny Depp, Helena Bonham Carter : Ameerika Ühendriigid - Suurbritannia 2007

  12. Northeast Cooperative Research Study Fleet (SF) Program Biological Sampling Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Northeast Cooperative Research Study Fleet (SF) Program partners with a subset of commercial fishermen to collect high quality, high resolution, haul by haul...

  13. Fleet Protection Using a Small UAV Based IR Sensor

    National Research Council Canada - National Science Library

    Buss, James R; Ax, Jr, George R

    2005-01-01

    A study was performed to define candidate electro-optical and infrared (EO/IR) sensor configurations and assess their potential utility as small UAV-based sensors surveilling a perimeter around surface fleet assets...

  14. US Tune Purse Seine Fleet History & Activity Database

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The NMFS SWR has collected historical vessel information on the U.S. tuna cannery baitboat and purse seine fleets for many years. The database's first record of a...

  15. 41 CFR 101-39.004 - Optional operations.

    Science.gov (United States)

    2010-07-01

    ...-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.0-General Provisions § 101-39.004 Optional operations. Nothing in this part shall preclude the establishment or operation of interagency fleet management systems by GSA or by... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Optional operations. 101...

  16. Business fleet refueling assessment. Final report, March 1992-November 1992

    International Nuclear Information System (INIS)

    Chaudier, A.

    1993-01-01

    The report investigates refueling characteristics and capabilities for the light-duty market sector, particularly business automobile fleets. It develops a profile of the characteristics of light-duty and automobile business fleets in 22 designated non-attainment areas, as well as Pittsburgh and Salt Lake City. Reliable data on these subjects will enable better analysis of the market potential for natural gas in the surveyed areas

  17. TQL in the Fleet: From Theory to Practice

    Science.gov (United States)

    1993-10-01

    distribution is unlimited. BEST-AVAILABLE Copy 94-04214 Total Quality Leadership , TQL, Total Quality Kanaginent, 191, i lo of pilo quality management ...703-602-8942). LINDA M. DOHERTY Director Department of the Navy Total Quality Leadership Office TOL In the Fleet: From Theory to Practice...the Fleet: From Theory to Practice ix OVERVIEW ) ver the past year, the Department of the Navy Total Quality Leadership Office (DON TQL Office) has

  18. Remote handling for an ISIS target change

    International Nuclear Information System (INIS)

    Broome, T.A.; Holding, M.

    1989-01-01

    During 1987 two ISIS targets were changed. This document describes the main features of the remote handling aspects of the work. All the work has to be carried out using remote handling techniques. The radiation level measured on the surface of the reflector when the second target had been removed was about 800 mGy/h demonstrating that hands on operations on any part of the target reflector moderator assembly is not practical. The target changes were the first large scale operations in the Target Station Remote Handling Cell and a great deal was learned about both equipment and working practices. Some general principles emerged which are applicable to other active handling tasks on facilities like ISIS and these are discussed below. 8 figs

  19. Detecting and categorizing fleeting emotions in faces.

    Science.gov (United States)

    Sweeny, Timothy D; Suzuki, Satoru; Grabowecky, Marcia; Paller, Ken A

    2013-02-01

    Expressions of emotion are often brief, providing only fleeting images from which to base important social judgments. We sought to characterize the sensitivity and mechanisms of emotion detection and expression categorization when exposure to faces is very brief, and to determine whether these processes dissociate. Observers viewed 2 backward-masked facial expressions in quick succession, 1 neutral and the other emotional (happy, fearful, or angry), in a 2-interval forced-choice task. On each trial, observers attempted to detect the emotional expression (emotion detection) and to classify the expression (expression categorization). Above-chance emotion detection was possible with extremely brief exposures of 10 ms and was most accurate for happy expressions. We compared categorization among expressions using a d' analysis, and found that categorization was usually above chance for angry versus happy and fearful versus happy, but consistently poor for fearful versus angry expressions. Fearful versus angry categorization was poor even when only negative emotions (fearful, angry, or disgusted) were used, suggesting that this categorization is poor independent of decision context. Inverting faces impaired angry versus happy categorization, but not emotion detection, suggesting that information from facial features is used differently for emotion detection and expression categorizations. Emotion detection often occurred without expression categorization, and expression categorization sometimes occurred without emotion detection. These results are consistent with the notion that emotion detection and expression categorization involve separate mechanisms. PsycINFO Database Record (c) 2013 APA, all rights reserved.

  20. Detecting and Categorizing Fleeting Emotions in Faces

    Science.gov (United States)

    Sweeny, Timothy D.; Suzuki, Satoru; Grabowecky, Marcia; Paller, Ken A.

    2013-01-01

    Expressions of emotion are often brief, providing only fleeting images from which to base important social judgments. We sought to characterize the sensitivity and mechanisms of emotion detection and expression categorization when exposure to faces is very brief, and to determine whether these processes dissociate. Observers viewed 2 backward-masked facial expressions in quick succession, 1 neutral and the other emotional (happy, fearful, or angry), in a 2-interval forced-choice task. On each trial, observers attempted to detect the emotional expression (emotion detection) and to classify the expression (expression categorization). Above-chance emotion detection was possible with extremely brief exposures of 10 ms and was most accurate for happy expressions. We compared categorization among expressions using a d′ analysis, and found that categorization was usually above chance for angry versus happy and fearful versus happy, but consistently poor for fearful versus angry expressions. Fearful versus angry categorization was poor even when only negative emotions (fearful, angry, or disgusted) were used, suggesting that this categorization is poor independent of decision context. Inverting faces impaired angry versus happy categorization, but not emotion detection, suggesting that information from facial features is used differently for emotion detection and expression categorizations. Emotion detection often occurred without expression categorization, and expression categorization sometimes occurred without emotion detection. These results are consistent with the notion that emotion detection and expression categorization involve separate mechanisms. PMID:22866885

  1. FLEET Velocimetry Measurements on a Transonic Airfoil

    Science.gov (United States)

    Burns, Ross A.; Danehy, Paul M.

    2017-01-01

    Femtosecond laser electronic excitation tagging (FLEET) velocimetry was used to study the flowfield around a symmetric, transonic airfoil in the NASA Langley 0.3-m TCT facility. A nominal Mach number of 0.85 was investigated with a total pressure of 125 kPa and total temperature of 280 K. Two-components of velocity were measured along vertical profiles at different locations above, below, and aft of the airfoil at angles of attack of 0 deg, 3.5 deg, and 7deg. Measurements were assessed for their accuracy, precision, dynamic range, spatial resolution, and overall measurement uncertainty in the context of the applied flowfield. Measurement precisions as low as 1 m/s were observed, while overall uncertainties ranged from 4 to 5 percent. Velocity profiles within the wake showed sufficient accuracy, precision, and sensitivity to resolve both the mean and fluctuating velocities and general flow physics such as shear layer growth. Evidence of flow separation is found at high angles of attack.

  2. Transport fleet sizing by using make and buy decision-making

    Directory of Open Access Journals (Sweden)

    Stojanović Đurđica

    2011-01-01

    Full Text Available Cost reduction is among the main quoted reasons for logistics outsourcing, while transport capacities and operations are among the most outsourced logistics areas. However, according to transaction costs theory, there is often room for transport insourcing. Furthermore, nowadays many authors stress that mixed solutions can give better results than “make” or “buy” alternatives. “Make or buy” decision-making normative models, methods, and procedures in transport planning are not much explored. Instead, research is rather focused on carrier selection techniques, whereby it is supposed that outsourcing transport capacities is the most suitable solution. The purpose of this paper is to contribute to the body of literature on classical “makeor-buy” decision-making in transport fleet sizing in a non-logistics enterprise. It goes beyond the basic “make or buy” decisionmaking, and intermediate solutions (i.e., “make and buy” are explored. Practical directions are given according to theoretical principles, and a case study is used to exemplify the main deductions. The research also has practical implications. Many enterprises in transition economies have faced the question of what to do with their in-house transport fleets. The obtained results are of interest to merchants and manufacturing enterprises that already have a private transport fleet and are considering how to rationalize it.

  3. Refueling Behavior of Flexible Fuel Vehicle Drivers in the Federal Fleet

    Energy Technology Data Exchange (ETDEWEB)

    Daley, R.; Nangle, J.; Boeckman, G.; Miller, M.

    2014-05-01

    Federal fleets are a frequent subject of legislative and executive efforts to lead a national transition to alternative fuels and advanced vehicle technologies. Section 701 of the Energy Policy Act of 2005 requires that all dual-fueled alternative fuel vehicles in the federal fleet be operated on alternative fuel 100% of the time when they have access to it. However, in Fiscal Year (FY) 2012, drivers of federal flex fuel vehicles (FFV) leased through the General Services Administration refueled with E85 24% of the time when it was available--falling well short of the mandate. The U.S. Department of Energy's National Renewable Energy Laboratory completed a 2-year Laboratory Directed Research and Development project to identify the factors that influence the refueling behavior of federal FFV drivers. The project began with two primary hypotheses. First, information scarcity increases the tendency to miss opportunities to purchase E85. Second, even with perfect information, there are limits to how far drivers will go out of their way to purchase E85. This paper discusses the results of the project, which included a June 2012 survey of federal fleet drivers and an empirical analysis of actual refueling behavior from FY 2009 to 2012. This research will aid in the design and implementation of intervention programs aimed at increasing alternative fuel use and reducing petroleum consumption.

  4. Human factors issues in fuel handling

    International Nuclear Information System (INIS)

    Beattie, J.D.; Iwasa-Madge, K.M.; Tucker, D.A.

    1994-01-01

    The staff of the Atomic Energy Control Board wish to further their understanding of human factors issues of potential concern associated with fuel handling in CANDU nuclear power stations. This study contributes to that objective by analysing the role of human performance in the overall fuel handling process at Ontario Hydro's Darlington Nuclear Generating Station, and reporting findings in several areas. A number of issues are identified in the areas of design, operating and maintenance practices, and the organizational and management environment

  5. Managing fleet capacity effectively under second-hand market redistribution.

    Science.gov (United States)

    Quillérou, Emmanuelle; Roudaut, Nolwenn; Guyader, Olivier

    2013-09-01

    Fishing capacity management policies have been traditionally implemented at national level with national targets for capacity reduction. More recently, capacity management policies have increasingly targeted specific fisheries. French fisheries spatially vary along the French coastline and are associated to specific regions. Capacity management policies, however, ignore the capital mobility associated with second-hand vessel trade between regions. This is not an issue for national policies but could limit the effectiveness of regional capacity management policies. A gravity model and a random-effect Poisson regression model are used to analyze the determinants and spatial extent of the second-hand market in France. This study is based on panel data from the French Atlantic Ocean between 1992 and 2009. The trade flows between trading partners is found to increase with their sizes and to be spatially concentrated. Despite the low trade flows between regions, a net impact analysis shows that fishing capacity is redistributed by the second-hand market to regions on the Channel and Aquitaine from central regions. National capacity management policies (constructions/destructions) have induced a net decrease in regional fleet capacity with varying magnitude across regions. Unless there is a change of policy instruments or their scale of implementation, the operation of the second-hand market decreases the effectiveness of regional capacity management policies in regions on the Channel and Aquitaine.

  6. More fleet adjustments seen needed for drilling industry

    International Nuclear Information System (INIS)

    Lundy, K.

    1992-01-01

    The Canadian oil and gas industry has been in a mode of restructuring since the late 1980s as it became increasingly apparent that the natural gas boom which was to replace activity previously generated by high oil process was not going to materialize. This paper reports that the production companies operating in Canada are concentrating on rationalization of land holdings and corporate downsizing and realignment rather than exploration and development of petroleum resources. Not surprisingly, this has resulted in a substantial downturn of the contract drilling and well servicing sectors in both western Canada, where the majority (95%) of the industry activity takes place, and in the frontier and East Coast offshore arenas. The persistently low levels of utilization throughout this period and prior to the Organization of Petroleum Exporting Countries price shocks in the '70s illustrate that the high levels achieved in the late '70s and early '80s were an aberration. The rig fleet, which was expanded to meet this abnormally high demand, must continue to rationalize if profitability is to return on an on an industrywide basis

  7. Implications of energy use for fishing fleet-Taiwan example

    International Nuclear Information System (INIS)

    Hua Jian; Wu Yihusan

    2011-01-01

    Commercial fisheries rely heavily on fossil fuel combustion and contribute heavily to the emission of atmospheric pollutants and greenhouse gases. Propulsion output of fishing vessels has continually increased from 30 kW in 1959 to nearly 320 kW in 2000, indicating that the Taiwanese fishing fleet tended to voyage farther and faster, and to adjust for the heavier loads demanded by more powerful fishing gear. Daily emissions from Taiwanese fishing vessels were estimated using output method. The marine fishery is unlikely to grow in the future as the government is implementing measures to ensure the development of sustainable fishing practices. There has been a rising trend in pollution to production ratios during the study period between 1959 and 2008. The ratio increased by 47% in the first decade, followed by fluctuations within the range of 50%-58% for the remainder of the statistical period. There is a need to investigate the possibility of reductions in all categories of fishing with regard to energy use and emissions through the subsidization of fishing vessels to encourage operators to switch to more energy efficient equipment and cleaner fuels. - Highlights: → Daily emissions from Taiwanese fishing vessels were estimated using output method. → We reported a steady increase in pollution to production ratio in Taiwan fishing industry. → We urged government and industry work together to ensure a transition to low carbon fishing.

  8. Trends in the development and updating of the fishing fleet in the Northern Basin

    Directory of Open Access Journals (Sweden)

    Kuranov Yu. F.

    2017-12-01

    Full Text Available The practice and need to update and form the production and technical base of fishery enterprises have an increasing impact on performance of the fisheries complex and become decisive when considering the prospects for its development on an innovative basis. The paper examines the current state and development trends of the Northern Basin fishing fleet, its production capabilities in developing available bioresources, the need and prospects for renewal. During the research the influence of the main factors determining the formation of the quantitative and structural composition of the fishing fleet has been shown. The most stable and long-term impact is the state of commercial stocks of aquatic biological resources, their variability under the influence of natural factors and anthropogenic load. The second important factor is institutional changes. Initially, since the beginning of the 1990s, this took place due to the transformation of economic relations, and later – to institutional changes in the legislatively approved principles of granting fishing enterprises the right to access water biological resources. The following data have been presented: adaptation of the fleet's production capacities for specialization of fishing activities, ways of modernization and re-equipment, construction of new vessels, acquisition of vessels being in operation in the countries with developed fisheries. These changes had reduced the fleet's production potential raising its qualitative indicators (productivity, depth of processing of raw materials at sea. At the same time, the noted positive trends have been accompanied by some increase in the aging indicators for all groups and types of vessels. The institutional and economic instruments for supporting and stimulating the construction of new fishing vessels have been justified. Nowadays, in the Northern Basin the priority areas of support should be the construction of ships for pelagic fishing and coastal

  9. Layup practices at EDF PWR fleet and future developments

    International Nuclear Information System (INIS)

    Ramos, Olga Alos; Pablo, Sergio De Maria; Wintergerst, Matthieu

    2014-01-01

    A proper lay-up can only be achieved by plant specific lay-up procedures. The layup control practices are necessary to prevent corrosion damage during shutdown and are an important part of the life time extension of a nuclear power plant. EDF operational experience in this area confirms that damage to plant equipment from improper layup procedures is a cause of reduced plant reliability and availability and can increase the corrosion products ingress into the SG during start-up. The plant preservation strategy applied across the EDF fleet is based on the following principles: Anticipated time frame of the required layup: short-term outages can become long-term outages, and can necessitate the use of unplanned preservation techniques. Dry layup for a long-term outage of the condensate/feedwater system: condenser vacuum assisted draining at high temperature, estimation of air requirements (flow rate, humidity...) to guarantee the optimum conditions inside the system. Wet lay up for a short-term outage of the condensate/feedwater system: system filled with operating medium, avoiding air ingress into the system, injection of chemical agents if necessary. Dry lay-up or wet lay up for the steam generators depending on maintenance work or radiation protection needed. This article presents the EDF layup program and the improvements in layup practices. It provides information on the layup procedures, best practices and recommendations, operating experience, considerations for different durations of outages; the implementation of a preservation working group, the selection of the systems that will be included in the lay-up program. Finally, future developments will be presented, such as the development of a 'convective model' to determine air requirements (humidity, flow rate...) and the drying rate to dry a heat exchanger. (author)

  10. 340 waste handling facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  11. 340 waste handling facility interim safety basis

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  12. LACIE data-handling techniques

    Science.gov (United States)

    Waits, G. H. (Principal Investigator)

    1979-01-01

    Techniques implemented to facilitate processing of LANDSAT multispectral data between 1975 and 1978 are described. The data that were handled during the large area crop inventory experiment and the storage mechanisms used for the various types of data are defined. The overall data flow, from the placing of the LANDSAT orders through the actual analysis of the data set, is discussed. An overview is provided of the status and tracking system that was developed and of the data base maintenance and operational task. The archiving of the LACIE data is explained.

  13. Practices of Handling

    DEFF Research Database (Denmark)

    Ræbild, Ulla

    to touch, pick up, carry, or feel with the hands. Figuratively it is to manage, deal with, direct, train, or control. Additionally, as a noun, a handle is something by which we grasp or open up something. Lastly, handle also has a Nordic root, here meaning to trade, bargain or deal. Together all four...... meanings seem to merge in the fashion design process, thus opening up for an embodied engagement with matter that entails direction giving, organizational management and negotiation. By seeing processes of handling as a key fashion methodological practice, it is possible to divert the discourse away from...... introduces four ways whereby fashion designers apply their own bodies as tools for design; a) re-activating past garment-design experiences, b) testing present garment-design experiences c) probing for new garment-design experiences and d) design of future garment experiences by body proxy. The paper...

  14. Review of BNFL's operational experience of wet type flasks

    International Nuclear Information System (INIS)

    McWilliam, D.S.

    2004-01-01

    BNFL International Transport's operational experience includes shipping 6000te of spent fuel from Japan to Sellafield, through its dedicated terminal at Barrow, and to Cogema La Hague. This fuel was shipped under the PNTL (Pacific Nuclear Transport Ltd) banner for which BNFL is responsible. PNTL owned and operated a fleet of 5 ships for Japanese business and a fleet of 80 wet and 58 dry flasks, for the transport of Light Water Reactor (LWR) spent fuel, from both Pressurised Water Reactors (PWR) and Boiling Water Reactors (BWR). ''Wet'' or ''dry'' flask is the common terminology used to distinguish between spent fuel flasks transporting fuel where the fuel is immersed in water, or spent fuel flasks that have been drained of water and dried. This paper concentrates on the wet type of flask utilised to transport fuel to Sellafield, that is the Excellox type (including similar type NTL derivatives). It aims to provide a summary of operational experience during handling at power stations, shipment, unloading at reprocessors and from scheduled maintenance

  15. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Golden Gate National Recreation Area

    Energy Technology Data Exchange (ETDEWEB)

    Stephen Schey; Jim Francfort

    2014-03-01

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy's Idaho National Laboratory, is the lead laboratory for U.S. Department of Energy Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (ITSNA) to collect data on federal fleet operations as part of the Advanced Vehicle Testing Activity's Federal Fleet Vehicle Data Logging and Characterization study. The Advanced Vehicle Testing Activity study seeks to collect data to validate the utilization of advanced electric drive vehicle transportation. This report focuses on the Golden Gate National Recreation Area (GGNRA) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies' fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (PHEV) (collectively PEVs) can fulfill the mission requirements. GGNRA identified 182 vehicles in its fleet, which are under the management of the U.S. General Services Administration. Fleet vehicle mission categories are defined in Section 4, and while the GGNRA vehicles conduct many different missions, only two (i.e., support and law enforcement missions) were selected by agency management to be part of this fleet evaluation. The selected vehicles included sedans, trucks, and sport-utility vehicles. This report will show that battery electric vehicles and/or PHEVs are capable of performing the required missions and providing an alternative vehicle for support vehicles and PHEVs provide the same for law enforcement, because each has a sufficient range for individual trips and time is available each day for charging to accommodate multiple trips per day. These

  16. Automated system for handling tritiated mixed waste

    International Nuclear Information System (INIS)

    Dennison, D.K.; Merrill, R.D.; Reitz, T.C.

    1995-03-01

    Lawrence Livermore National Laboratory (LLNL) is developing a semi system for handling, characterizing, processing, sorting, and repackaging hazardous wastes containing tritium. The system combines an IBM-developed gantry robot with a special glove box enclosure designed to protect operators and minimize the potential release of tritium to the atmosphere. All hazardous waste handling and processing will be performed remotely, using the robot in a teleoperational mode for one-of-a-kind functions and in an autonomous mode for repetitive operations. Initially, this system will be used in conjunction with a portable gas system designed to capture any gaseous-phase tritium released into the glove box. This paper presents the objectives of this development program, provides background related to LLNL's robotics and waste handling program, describes the major system components, outlines system operation, and discusses current status and plans

  17. Radiological safety aspects of handling plutonium

    International Nuclear Information System (INIS)

    Sundararajan, A.R.

    2016-01-01

    Department of Atomic Energy in its scheme of harnessing the nuclear energy for electrical power generation and strategic applications has given a huge role to utilization of plutonium. In the power production programme, fast reactors with plutonium as fuel are expected to play a major role. This would require establishing fuel reprocessing plants to handle both thermal and fast reactor fuels. So in the nuclear fuel cycle facilities variety of chemical, metallurgical, mechanical operations have to be carried out involving significant inventories of "2"3"9 Pu and associated radionuclides. Plutonium is the most radiotoxic radionuclide and therefore any facility handling it has to be designed and operated with utmost care. Two problems of major concern in the protection of persons working in plutonium handling facilities are the internal exposure to the operating personnel from uptake of plutonium and transplutonic nuclides as they are highly radiotoxic and the radiation exposure of hands and eye lens during fuel fabrication operations especially while handling recycled high burn up plutonium. In view of the fact that annual limit for intake is very small for "2"3"9Pu and its radiation emission characteristics are such that it is a huge challenge for the health physicists to detect Pu in air and in workers. This paper discusses the principles and practices followed in providing radiological surveillance to workers in plutonium handling areas. The challenges in protecting the workers from receiving exposures to hands and eye lens in handling high burn up plutonium are also discussed. The sites having Pu fuel cycle facilities should have trained medical staff to handle cases involving excessive intake of plutonium. (author)

  18. Ordering decision-making methods on spare parts for a new aircraft fleet based on a two-sample prediction

    International Nuclear Information System (INIS)

    Yongquan, Sun; Xi, Chen; He, Ren; Yingchao, Jin; Quanwu, Liu

    2016-01-01

    Ordering decision-making on spare parts is crucial in maximizing aircraft utilization and minimizing total operating cost. Extensive researches on spare parts inventory management and optimal allocation could be found based on the amount of historical operation data or condition-monitoring data. However, it is challengeable to make an ordering decision on spare parts under the case of establishment of a fleet by introducing new aircraft with little historical data. In this paper, spare parts supporting policy and ordering decision-making policy for new aircraft fleet are analyzed firstly. Then two-sample predictions for a Weibull distribution and a Weibull process are incorporated into forecast of the first failure time and failure number during certain time period using Bayesian and classical method respectively, according to which the ordering time and ordering quantity for spare parts are identified. Finally, a case study is presented to illustrate the methods of identifying the ordering time and ordering number of engine-driven pumps through forecasting the failure time and failure number, followed by a discussion on the impact of various fleet sizes on prediction results. This method has the potential to decide the ordering time and quantity of spare parts when a new aircraft fleet is established. - Highlights: • A modeling framework of ordering spare parts for a new fleet is proposed. • Models for ordering time and number are established based on two-sample prediction. • The computation of future failure time is simplified using Newtonian binomial law. • Comparison of the first failure time PDFs is used to identify process parameters. • Identification methods for spare parts are validated by Engine Driven Pump case study.

  19. Handling Japanese without a Japanese Operating System.

    Science.gov (United States)

    Hatasa, Kazumi; And Others

    1992-01-01

    The Macintosh HyperCard environment has become a popular platform for Japanese language courseware because of its flexibility and ease of programing. This project created Japanese bitmap font files for the JIS Levels 1 and 2, and writing XFCNs for font manipulation, Japanese kana input, and answer correction. (12 references) (Author/LB)

  20. Grain Grading and Handling.

    Science.gov (United States)

    Rendleman, Matt; Legacy, James

    This publication provides an introduction to grain grading and handling for adult students in vocational and technical education programs. Organized in five chapters, the booklet provides a brief overview of the jobs performed at a grain elevator and of the techniques used to grade grain. The first chapter introduces the grain industry and…

  1. Mars Sample Handling Functionality

    Science.gov (United States)

    Meyer, M. A.; Mattingly, R. L.

    2018-04-01

    The final leg of a Mars Sample Return campaign would be an entity that we have referred to as Mars Returned Sample Handling (MRSH.) This talk will address our current view of the functional requirements on MRSH, focused on the Sample Receiving Facility (SRF).

  2. Handling wood shavings

    Energy Technology Data Exchange (ETDEWEB)

    1974-09-18

    Details of bulk handling equipment suitable for collection and compressing wood waste from commercial joinery works are discussed. The Redler Bin Discharger ensures free flow of chips from storage silo discharge prior to compression into briquettes for use as fuel or processing into chipboard.

  3. Medium-Duty Plug-in Electric Delivery Truck Fleet Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Prohaska, Robert; Ragatz, Adam; Simpson, Mike; Kelly, Kenneth

    2016-06-29

    In this paper, the authors present an overview of medium-duty electric vehicle (EV) operating behavior based on in-use data collected from Smith Newton electric delivery vehicles and compare their performance and operation to conventional diesel trucks operating in the same fleet. The vehicles' drive cycles and operation are analyzed and compared to demonstrate the importance of matching specific EV technologies to the appropriate operational duty cycle. The results of this analysis show that the Smith Newton EVs demonstrated a 68% reduction in energy consumption over the data reporting period compared to the conventional diesel vehicles, as well as a 46.4% reduction in carbon dioxide equivalent emissions based on the local energy generation source.

  4. Fossil fleet transition with fuel changes and large scale variable renewable integration

    Energy Technology Data Exchange (ETDEWEB)

    James, Revis [Electric Power Research Institute, Palo Alto, CA (United States); Hesler, Stephen [Electric Power Research Institute, Palo Alto, CA (United States); Bistline, John [Electric Power Research Institute, Palo Alto, CA (United States)

    2015-03-31

    Variability in demand as seen by grid-connected dispatchable generators can increase due to factors such as greater production from variable generation assets (for example, wind and solar), increased reliance on demand response or customer-driven automation, and aggregation of loads. This variability results a need for these generators to operate in a range of different modes, collectively referred to as “flexible operations.” This study is designed to inform power companies, researchers, and policymakers of the scope and trends in increasing levels of flexible operations as well as reliability challenges and impacts for dispatchable assets. Background Because there is rarely a direct monetization of the value of operational flexibility, the decision to provide such flexibility is typically dependent on unit- and region-specific decisions made by asset owners. It is very likely that much greater and more widespread flexible operations capabilities will be needed due to increased variability in demand seen by grid-connected generators, uncertainty regarding investment in new units to provide adequate operational flexibility, and the retirement of older, uncontrolled sub-critical pulverized coal units. Objective To enhance understanding of the technical challenges and operational impacts associated with dispatchable assets needed to increase operational flexibility and support variable demand. Approach The study approach consists of three elements: a literature review of relevant prior studies, analysis of detailed scenarios for evolution of the future fleet over the next 35 years, and engineering assessment of the degree and scope of technical challenges associated with transformation to the future fleet. The study approach integrated two key elements rarely brought together in a single analysis—1) long-term capacity planning, which enables modeling of unit retirements and new asset investments, and 2) unit commitment analysis, which permits examination of

  5. Information Technology Management System: an Analysis on Computational Model Failures for Fleet Management

    Directory of Open Access Journals (Sweden)

    Jayr Figueiredo de Oliveira

    2013-10-01

    Full Text Available This article proposes an information technology model to evaluate fleet management failure. Qualitative research done by a case study within an Interstate Transport company in a São Paulo State proposed to establish a relationship between computer tools and valid trustworthy information needs, and within an acceptable timeframe, for decision making, reliability, availability and system management. Additionally, the study aimed to provide relevant and precise information, in order to minimize and mitigate failure actions that may occur, compromising all operational organization base functioning.

  6. Role of subsidies in EU fleet capacity management

    DEFF Research Database (Denmark)

    Lindebo, Erik

    2005-01-01

    Fisheries in the European Union (EU) continue to be overexploited by an overcapitalised fishing fleet, despite the best intentions of two decades of capacity adjustment programmes. This paper considers the progress of fishing capacity under the Multi-annual Guidance Programme and examines the imp...... of vessel decommissioning. The Danish fishing fleet case serves as an empirical example in this regard. Comments on the future capacity management regime and the role of subsidies in EU fisheries are offered.......Fisheries in the European Union (EU) continue to be overexploited by an overcapitalised fishing fleet, despite the best intentions of two decades of capacity adjustment programmes. This paper considers the progress of fishing capacity under the Multi-annual Guidance Programme and examines...

  7. Evaluation of Gear Condition Indicator Performance on Rotorcraft Fleet

    Science.gov (United States)

    Antolick, Lance J.; Branning, Jeremy S.; Wade, Daniel R.; Dempsey, Paula J.

    2010-01-01

    The U.S. Army is currently expanding its fleet of Health Usage Monitoring Systems (HUMS) equipped aircraft at significant rates, to now include over 1,000 rotorcraft. Two different on-board HUMS, the Honeywell Modern Signal Processing Unit (MSPU) and the Goodrich Integrated Vehicle Health Management System (IVHMS), are collecting vibration health data on aircraft that include the Apache, Blackhawk, Chinook, and Kiowa Warrior. The objective of this paper is to recommend the most effective gear condition indicators for fleet use based on both a theoretical foundation and field data. Gear diagnostics with better performance will be recommended based on both a theoretical foundation and results of in-fleet use. In order to evaluate the gear condition indicator performance on rotorcraft fleets, results of more than five years of health monitoring for gear faults in the entire HUMS equipped Army helicopter fleet will be presented. More than ten examples of gear faults indicated by the gear CI have been compiled and each reviewed for accuracy. False alarms indications will also be discussed. Performance data from test rigs and seeded fault tests will also be presented. The results of the fleet analysis will be discussed, and a performance metric assigned to each of the competing algorithms. Gear fault diagnostic algorithms that are compliant with ADS-79A will be recommended for future use and development. The performance of gear algorithms used in the commercial units and the effectiveness of the gear CI as a fault identifier will be assessed using the criteria outlined in the standards in ADS-79A-HDBK, an Army handbook that outlines the conversion from Reliability Centered Maintenance to the On-Condition status of Condition Based Maintenance.

  8. A road safety performance indicator for vehicle fleet compatibility.

    Science.gov (United States)

    Christoph, Michiel; Vis, Martijn Alexander; Rackliff, Lucy; Stipdonk, Henk

    2013-11-01

    This paper discusses the development and the application of a safety performance indicator which measures the intrinsic safety of a country's vehicle fleet related to fleet composition. The indicator takes into account both the 'relative severity' of individual collisions between different vehicle types, and the share of those vehicle types within a country's fleet. The relative severity is a measure for the personal damage that can be expected from a collision between two vehicles of any type, relative to that of a collision between passenger cars. It is shown how this number can be calculated using vehicle mass only. A sensitivity analysis is performed to study the dependence of the indicator on parameter values and basic assumptions made. The indicator is easy to apply and satisfies the requirements for appropriate safety performance indicators. It was developed in such a way that it specifically scores the intrinsic safety of a fleet due to its composition, without being influenced by other factors, like helmet wearing. For the sake of simplicity, and since the required data is available throughout Europe, the indicator was applied to the relative share of three of the main vehicle types: passenger cars, heavy goods vehicles and motorcycles. Using the vehicle fleet data from 13EU Member States and Norway, the indicator was used to rank the countries' safety performance. The UK was found to perform best in terms of its fleet composition (value is 1.07), while Greece has the worst performance with the highest indicator value (1.41). Copyright © 2013 Elsevier Ltd. All rights reserved.

  9. 340 Waste Handling Facility interim safety basis

    International Nuclear Information System (INIS)

    Bendixsen, R.B.

    1995-01-01

    This document establishes the interim safety basis (ISB) for the 340 Waste Handling Facility (340 Facility). An ISB is a documented safety basis that provides a justification for the continued operation of the facility until an upgraded final safety analysis report is prepared that complies with US Department of Energy (DOE) Order 5480.23, Nuclear Safety Analysis Reports. The ISB for the 340 Facility documents the current design and operation of the facility. The 340 Facility ISB (ISB-003) is based on a facility walkdown and review of the design and operation of the facility, as described in the existing safety documentation. The safety documents reviewed, to develop ISB-003, include the following: OSD-SW-153-0001, Operating Specification Document for the 340 Waste Handling Facility (WHC 1990); OSR-SW-152-00003, Operating Limits for the 340 Waste Handling Facility (WHC 1989); SD-RE-SAP-013, Safety Analysis Report for Packaging, Railroad Liquid Waste Tank Cars (Mercado 1993); SD-WM-TM-001, Safety Assessment Document for the 340 Waste Handling Facility (Berneski 1994a); SD-WM-SEL-016, 340 Facility Safety Equipment List (Berneski 1992); and 340 Complex Fire Hazard Analysis, Draft (Hughes Assoc. Inc. 1994)

  10. Fuel options for public bus fleets in Sweden

    OpenAIRE

    Xylia, Maria; Silveira, Semida

    2015-01-01

    The Swedish public transport sector has defined two major targets, i.e., to run 90% of the total vehicle kilometers of the fleet on non-fossil fuels and double the volume of travel via public transport by 2020, increasing the share of public transport in relation to the total personal transport in the country . The f3 report Fuel options for public bus fleets in Sweden highlights the challenges and solutions encountered, particularly when it comes to the adoption of renewable fuels in the reg...

  11. HVAC System Replacements for the Spanish Nuclear Fleet

    Energy Technology Data Exchange (ETDEWEB)

    Izquierdo, J.; Gensollen, T.; Pérez, C.

    2015-07-01

    The European Union and its Member States have established regulations to phase out ozone-depleting chlorofluorocarbons (CFCs). The chiller systems installed at the Spanish nuclear fleet contained zone depleting refrigerants (such as R-11, R-12, and R-22), which are being phased out of service. Due to the different material and thermodynamic properties of the replacement refrigerant (e.g. R-134A), a complete chiller system replacement is needed to comply with the EU regulations for CFCs. Delivering state of the art HVAC and Chiller systems that comply with the Nuclear Plant design basis, licensing basis, system and component specifications as well as European Union (EU) and Spanish codes and standards can be challenging for products purchased from US based manufacturers. Procurement specifications and Request for Quotes (RFQs) issued today for the procurement of original Plant components and systems will contain references to numerous codes and standards that were not in effect at the time the original components were specified and procured. The reference to EU and Spanish codes and standards that are unfamiliar to the HVAC suppliers can lead to uncertainty and concern related to specification compliance. The unnecessary burden of ambiguous codes and standards complicates the proposal process and introduces pricing uncertainty and contract risk. A review of the EU and Spanish national codes and standards that are often referenced in HVAC system related RFQs need to be performed to determine what codes and standards are applicable to HVAC systems designed, manufactured and tested in the US for export to Spain for installation in Spanish NPPs. Lessons learned and best practices should be applied to help both the Supplier (HVAC OEM) and the Purchaser Plant Operator) to optimize the procurement process and improve the quality of offerings to comply with applicable codes and standards. (Author)

  12. Test sample handling apparatus

    International Nuclear Information System (INIS)

    1981-01-01

    A test sample handling apparatus using automatic scintillation counting for gamma detection, for use in such fields as radioimmunoassay, is described. The apparatus automatically and continuously counts large numbers of samples rapidly and efficiently by the simultaneous counting of two samples. By means of sequential ordering of non-sequential counting data, it is possible to obtain precisely ordered data while utilizing sample carrier holders having a minimum length. (U.K.)

  13. Solid waste handling

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1995-01-01

    This study presents estimates of the solid radioactive waste quantities that will be generated in the Separations, Low-Level Waste Vitrification and High-Level Waste Vitrification facilities, collectively called the Tank Waste Remediation System Treatment Complex, over the life of these facilities. This study then considers previous estimates from other 200 Area generators and compares alternative methods of handling (segregation, packaging, assaying, shipping, etc.)

  14. Handling of radioactive waste

    International Nuclear Information System (INIS)

    Sanhueza Mir, Azucena

    1998-01-01

    Based on characteristics and quantities of different types of radioactive waste produced in the country, achievements in infrastructure and the way to solve problems related with radioactive waste handling and management, are presented in this paper. Objectives of maintaining facilities and capacities for controlling, processing and storing radioactive waste in a conditioned form, are attained, within a great range of legal framework, so defined to contribute with safety to people and environment (au)

  15. Renal phosphate handling: Physiology

    Directory of Open Access Journals (Sweden)

    Narayan Prasad

    2013-01-01

    Full Text Available Phosphorus is a common anion. It plays an important role in energy generation. Renal phosphate handling is regulated by three organs parathyroid, kidney and bone through feedback loops. These counter regulatory loops also regulate intestinal absorption and thus maintain serum phosphorus concentration in physiologic range. The parathyroid hormone, vitamin D, Fibrogenic growth factor 23 (FGF23 and klotho coreceptor are the key regulators of phosphorus balance in body.

  16. DOE handbook: Tritium handling and safe storage

    International Nuclear Information System (INIS)

    1999-03-01

    The DOE Handbook was developed as an educational supplement and reference for operations and maintenance personnel. Most of the tritium publications are written from a radiological protection perspective. This handbook provides more extensive guidance and advice on the null range of tritium operations. This handbook can be used by personnel involved in the full range of tritium handling from receipt to ultimate disposal. Compliance issues are addressed at each stage of handling. This handbook can also be used as a reference for those individuals involved in real time determination of bounding doses resulting from inadvertent tritium releases. This handbook provides useful information for establishing processes and procedures for the receipt, storage, assay, handling, packaging, and shipping of tritium and tritiated wastes. It includes discussions and advice on compliance-based issues and adds insight to those areas that currently possess unclear DOE guidance

  17. DOE handbook: Tritium handling and safe storage

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The DOE Handbook was developed as an educational supplement and reference for operations and maintenance personnel. Most of the tritium publications are written from a radiological protection perspective. This handbook provides more extensive guidance and advice on the null range of tritium operations. This handbook can be used by personnel involved in the full range of tritium handling from receipt to ultimate disposal. Compliance issues are addressed at each stage of handling. This handbook can also be used as a reference for those individuals involved in real time determination of bounding doses resulting from inadvertent tritium releases. This handbook provides useful information for establishing processes and procedures for the receipt, storage, assay, handling, packaging, and shipping of tritium and tritiated wastes. It includes discussions and advice on compliance-based issues and adds insight to those areas that currently possess unclear DOE guidance.

  18. MHSS: a material handling system simulator

    Energy Technology Data Exchange (ETDEWEB)

    Pomernacki, L.; Hollstien, R.B.

    1976-04-07

    A Material Handling System Simulator (MHSS) program is described that provides specialized functional blocks for modeling and simulation of nuclear material handling systems. Models of nuclear fuel fabrication plants may be built using functional blocks that simulate material receiving, storage, transport, inventory, processing, and shipping operations as well as the control and reporting tasks of operators or on-line computers. Blocks are also provided that allow the user to observe and gather statistical information on the dynamic behavior of simulated plants over single or replicated runs. Although it is currently being developed for the nuclear materials handling application, MHSS can be adapted to other industries in which material accountability is important. In this paper, emphasis is on the simulation methodology of the MHSS program with application to the nuclear material safeguards problem. (auth)

  19. Handling of Solid Residues

    International Nuclear Information System (INIS)

    Medina Bermudez, Clara Ines

    1999-01-01

    The topic of solid residues is specifically of great interest and concern for the authorities, institutions and community that identify in them a true threat against the human health and the atmosphere in the related with the aesthetic deterioration of the urban centers and of the natural landscape; in the proliferation of vectorial transmitters of illnesses and the effect on the biodiversity. Inside the wide spectrum of topics that they keep relationship with the environmental protection, the inadequate handling of solid residues and residues dangerous squatter an important line in the definition of political and practical environmentally sustainable. The industrial development and the population's growth have originated a continuous increase in the production of solid residues; of equal it forms, their composition day after day is more heterogeneous. The base for the good handling includes the appropriate intervention of the different stages of an integral administration of residues, which include the separation in the source, the gathering, the handling, the use, treatment, final disposition and the institutional organization of the administration. The topic of the dangerous residues generates more expectation. These residues understand from those of pathogen type that are generated in the establishments of health that of hospital attention, until those of combustible, inflammable type, explosive, radio-active, volatile, corrosive, reagent or toxic, associated to numerous industrial processes, common in our countries in development

  20. Transition to a hydrogen fuel cell transit bus fleet for Canadian urban transit system

    International Nuclear Information System (INIS)

    Ducharme, P.

    2004-01-01

    'Full text:' The Canadian Transportation Fuel Cell Alliance (CTFCA), created by the Canadian Government as part of its 2000 Climate Change Action Plan, has commissioned MARCON-DDM's Hydrogen Intervention Team (HIT) to provide a roadmap for urban transit systems that wish to move to hydrogen fuel cell-powered bus fleets. HIT is currently in the process of gathering information from hydrogen technology providers, bus manufacturers, fuelling system providers and urban transit systems in Canada, the US and Europe. In September, HIT will be in a position to provide a preview of its report to the CTFCA, due for October 2004. The planned table of contents includes: TOMORROW'S FUEL CELL (FC) URBAN TRANSIT BUS - Powertrain, on-board fuel technologies - FC engine system manufacturers - Bus technical specifications, performances, operating characteristics - FC bus manufacturers TOMORROW'S FC TRANSIT PROPERTY - Added maintenance, facilities and fuelling infrastructure requirements - Supply chain implications - Environmental and safety issues - Alternative operational concepts PATHWAYS TO THE FUTURE - Choosing the future operational concept - 'Gap' assessment - how long from here to there? - Facilities and fleet adjustments, including fuelling infrastructure - Risk mitigation, code compliance measures TRANSITIONAL CONSIDERATIONS - Cost implications - Transition schedule (author)

  1. SDIN a new information system for the EDF's fleet of French nuclear reactors

    International Nuclear Information System (INIS)

    Corre, Y.; Sasseigne, P.; Herodin, J.M.; Leclerq, J.

    2013-01-01

    The SDIN is the new information system that allows the management of operating and maintenance activities of EDF's fleet of nuclear power plants. This new system relies on 6 main softwares that allow: 1) the management of operations and maintenance, 2) the management of documentation, 3) the management of activities during unit outages, 4) the management of diagrams, schemes and designs, 5) the reporting of activities, and 6) a unified access to the SDIN. SDIN entered into operation in 2012 (6 years after its launching) in a testing phase in the Blayais power plant and in 2 engineering departments. SDIN is expected to improve the plant performance and its standard of safety as well as to prepare the way in terms of adequate technical conditions for operating life extension. (A.C.)

  2. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Fort Vancouver National Historic Site

    Energy Technology Data Exchange (ETDEWEB)

    Stephen Schey; Jim Francfort

    2014-03-01

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for the U.S. Department of Energy’s Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (ITSNA) to collect data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization study. The Advanced Vehicle Testing Activity study seeks to collect data to validate the use of advanced electric drive vehicle transportation. This report focuses on the Fort Vancouver National Historic Site (FVNHS) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of electric vehicles (EVs) into the agencies’ fleet. Individual observations of the selected vehicles provided the basis for recommendations related to EV adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles) could fulfill the mission requirements. FVNHS identified three vehicles in its fleet for consideration. While the FVNHS vehicles conduct many different missions, only two (i.e., support and pool missions) were selected by agency management to be part of this fleet evaluation. The logged vehicles included a pickup truck and a minivan. This report will show that BEVs and PHEVs are capable of performing the required missions and providing an alternative vehicle for both mission categories, because each has sufficient range for individual trips and time available each day for charging to accommodate multiple trips per day. These charging events could occur at the vehicle’s home base, high-use work areas, or in intermediate areas along routes that the vehicles frequently travel. Replacement of vehicles in the current fleet would result in

  3. The Potential Impact of Collaborative and Three-Dimensional Imaging Technology on SHIPMAIN Fleet Modernization Plan

    National Research Council Canada - National Science Library

    Seaman, Nathan L; Housel, Thomas; Mun, Jonathan

    2008-01-01

    Maintenance and modernization of the US Navy fleet is big business. The Navy has invested substantial fiscal and human resources to standardize the processes used to accomplish maintenance modernization and repair for its fleet of ships...

  4. A Qualitative Examination of the Administrative Process of Fleet Enlisted Personnel in Various Medical Categories

    National Research Council Canada - National Science Library

    Weatherford, Lenora

    2003-01-01

    The purpose of this research is to examine the medical management process of placing and monitoring active duty fleet enlisted personnel in a temporary medical duty status and its impact on fleet readiness...

  5. Risk Assessment and Analysis of the M109 Family of Vehicles Fleet Management Pilot Program

    National Research Council Canada - National Science Library

    Hitz, Stephen

    1997-01-01

    ...) Fleet Management Pilot Program. The objective of this program is to reengineer the fleet's logistical support system by outsourcing those functions which make sense and that can be performed more efficiently by private industry...

  6. The Fleet Support Community: Meeting Its Mission in the 21st Century

    National Research Council Canada - National Science Library

    Murdy, Deanna

    1999-01-01

    This thesis evaluates the effectiveness of the Fleet Support community's management practices in meeting the dynamic changes in the complex fleet support arena, while increasing its value to the Navy in the future...

  7. The Retrofit Puzzle Extended: Optimal Fleet Owner Behavior over Multiple Time Periods

    Science.gov (United States)

    2009-08-04

    In "The Retrofit Puzzle: Optimal Fleet Owner Behavior in the Context of Diesel Retrofit Incentive Programs" (1) an integer program was developed to model profit-maximizing diesel fleet owner behavior when selecting pollution reduction retrofits. Flee...

  8. Models for fleet sizing and localization of fire-fighting for attendance to accidents in platforms; Modelos para dimensionamento de frota e localizacao de embarcacoes fire-fighting para atendimento a acidentes em plataformas

    Energy Technology Data Exchange (ETDEWEB)

    Medina, Afonso Celso; Brinati, Marco Antonio [Sao Paulo Univ., SP (Brazil). Escola Politecnica

    1996-12-31

    The increasing degree of use of maritime resources claims the establishment of a modern protection and assistance system to prevent and control maritime accidents. The usual safety systems for maritime accidents, generally, have the aid of specialized fleets in the attendance. This work presents models to determine the location and the profile of a specialized fleet for fire fighting, in order to guarantee the adequate attendance to expected accidents in a marine oil field. To modelling the problem, two means of analysis are considered: a deterministic model of integer programming and a probabilistic model. Considering the geographic location and the size of platforms as input data, the deterministic model establishes, among the available vessels, the fleet profile and location in order to minimize the fleet cost assuring the attendance to each platform within the standard requirements. The probabilistic model starts from a given solution for the fleet profile and vessel location and, by means of estimating the utilization factors of each vessel, proposes possible improvements in the fleet location, in order to maximize the probability of attending the accidents. A simulation model was elaborated to validate the results from the probabilistic model. The obtained results indicate the usefulness of every model, not only to a rational location problem solution, but also, for the analysis of the operational fleet performance. (author) 11 refs., 4 figs., 4 tabs.

  9. A multiscale forecasting method for power plant fleet management

    Science.gov (United States)

    Chen, Hongmei

    In recent years the electric power industry has been challenged by a high level of uncertainty and volatility brought on by deregulation and globalization. A power producer must minimize the life cycle cost while meeting stringent safety and regulatory requirements and fulfilling customer demand for high reliability. Therefore, to achieve true system excellence, a more sophisticated system-level decision-making process with a more accurate forecasting support system to manage diverse and often widely dispersed generation units as a single, easily scaled and deployed fleet system in order to fully utilize the critical assets of a power producer has been created as a response. The process takes into account the time horizon for each of the major decision actions taken in a power plant and develops methods for information sharing between them. These decisions are highly interrelated and no optimal operation can be achieved without sharing information in the overall process. The process includes a forecasting system to provide information for planning for uncertainty. A new forecasting method is proposed, which utilizes a synergy of several modeling techniques properly combined at different time-scales of the forecasting objects. It can not only take advantages of the abundant historical data but also take into account the impact of pertinent driving forces from the external business environment to achieve more accurate forecasting results. Then block bootstrap is utilized to measure the bias in the estimate of the expected life cycle cost which will actually be needed to drive the business for a power plant in the long run. Finally, scenario analysis is used to provide a composite picture of future developments for decision making or strategic planning. The decision-making process is applied to a typical power producer chosen to represent challenging customer demand during high-demand periods. The process enhances system excellence by providing more accurate market

  10. The Fleet-Management as an Element of the Modern Development in the Ukrainian Leasing Market

    OpenAIRE

    Garafonova Olga I.; Svynarchuk Anastasiia V.

    2017-01-01

    The article is aimed at researching practical aspects of the fleet-management development in Ukraine; relationships that arise in this process; elements that interact in the market. The preconditions of the companies’ transition to the use of this concept in the management of fleet, as well as the opportunities that arise in the enterprises using the principles of fleet-management were considered. The main advantages and disadvantages of the implementation of fleet-management in companies wit...

  11. Recruitment to the Norwegian fishing fleet: storylines, paradoxes, and pragmatism in Norwegian fisheries and recruitment policy

    OpenAIRE

    Sønvisen, Signe Annie

    2013-01-01

    The majority of actors in the Norwegian fisheries consider recruitment of fishers to be the main future challenge for the Norwegian fishing fleet. As fleet recruitment is a highly politicized field, the problem of how to mitigate the recruitment problem is a subject of heavy debate. Some argue that recruitment problems are caused by low fleet profitability, while others argue that recruitment problems are caused by fleet restructuring polices. This article aims to explore th...

  12. Ship operations report, 1973

    International Nuclear Information System (INIS)

    1973-01-01

    The NOAA Fleet Operations Report 1973 was developed to provide a summary of project accomplishments during calendar year 1973. The report was prepared from season, cruise and special reports submitted by ships of the fleet. Centralized management of the NOAA Fleet was finalized by changing the operational control of the National Marine Fisheries Service (NMFS) Ships DAVID STARR JORDAN (FRS 44), TOWNSEND CROMWELL (FRS 43) and MURRE II (FRV 63) from NMFS to the National Ocean Survey on July 1, 1973. Throughout the year, ships routinely collected and transmitted weather data. Similarly, as NOAA participants in the Integrated Global Ocean Station System (IGOSS) service program, XBT observations were taken and either radioed or submitted in log form via mail. In addition, particulate and radionuclide samples were taken in cooperation with the Atomic Energy Commission, sediment samples were obtained for the Smithsonian Institution and observations were made of marine mammals

  13. Handling system for nuclear fuel pellet inspection

    International Nuclear Information System (INIS)

    Nyman, D.H.; McLemore, D.R.; Sturges, R.H.

    1978-11-01

    HEDL is developing automated fabrication equipment for fast reactor fuel. A major inspection operation in the process is the gaging of fuel pellets. A key element in the system has been the development of a handling system that reliably moves pellets at the rate of three per second without product damage or excessive equipment wear

  14. PREPD O and VE remote handling system

    International Nuclear Information System (INIS)

    Theil, T.N.

    1985-01-01

    The Process Experimental Pilot Plant (PREPP) at the Idaho National Engineering Laboratory is designed for volume reduction and packaging of transuranic (TRU) waste. The PREPP opening and verification enclosure (O and VE) remote handling system, within that facility, is designed to provide examination of the contents of various TRU waste storage containers. This remote handling system will provide the means of performing a hazardous operation that is currently performed manually. The TeleRobot to be used in this system is a concept that will incorporate and develop man in the loop operation (manual mode), standardized automatic sequencing of end effector tools, increased payload and reach over currently available computer-controlled robots, and remote handling of a hazardous waste operation. The system is designed within limited space constraints and an operation that was originally planned, and is currently being manually performed at other plants. The PREPP O and VE remote handling system design incorporates advancing technology to improve the working environment in the nuclear field

  15. 75 FR 20778 - Security Zone; Portland Rose Festival Fleet Week, Willamette River, Portland, OR

    Science.gov (United States)

    2010-04-21

    ...-AA87 Security Zone; Portland Rose Festival Fleet Week, Willamette River, Portland, OR AGENCY: Coast... during the Portland Rose Festival Fleet Week from June 2, 2010, through June 7, 2010. The security zone... is a need to provide a security zone for the 2010 Portland Rose Festival Fleet Week, and there is...

  16. 41 CFR 101-39.105-1 - Transfers from discontinued or curtailed fleet management systems.

    Science.gov (United States)

    2010-07-01

    ... discontinued or curtailed fleet management systems. 101-39.105-1 Section 101-39.105-1 Public Contracts and... AVIATION, TRANSPORTATION, AND MOTOR VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.1-Establishment, Modification, and Discontinuance of Interagency Fleet Management Systems § 101-39.105-1 Transfers from...

  17. 48 CFR 52.251-2 - Interagency Fleet Management System Vehicles and Related Services.

    Science.gov (United States)

    2010-10-01

    ... CLAUSES Text of Provisions and Clauses 52.251-2 Interagency Fleet Management System Vehicles and Related Services. As prescribed in 51.205, insert the following clause: Interagency Fleet Management System... to obtain interagency fleet management system vehicles and related services for use in the...

  18. 76 FR 1521 - Security Zone: Fleet Industrial Supply Center Pier, San Diego, CA

    Science.gov (United States)

    2011-01-11

    ...-AA87 Security Zone: Fleet Industrial Supply Center Pier, San Diego, CA AGENCY: Coast Guard, DHS. ACTION... Diego, CA. The existing security zone is around the former Fleet Industrial Supply Center Pier. The security zone encompasses all navigable waters within 100 feet of the former Fleet Industrial Supply Center...

  19. 41 CFR 102-34.340 - Do we need a fleet management information system?

    Science.gov (United States)

    2010-07-01

    ... management information system? 102-34.340 Section 102-34.340 Public Contracts and Property Management Federal... VEHICLE MANAGEMENT Federal Fleet Report § 102-34.340 Do we need a fleet management information system? Yes, you must have a fleet management information system at the department or agency level that — (a...

  20. Evolution of the deep-sea fleet that supports Canada's international trade

    Science.gov (United States)

    2002-01-01

    This study identifies the flag-related trends of fleets used in Canada's international sea-borne trade relative to the world fleet during the 15-year period from 1985 to 1999. The goal is to determine if there is any indication that fleets that serve...

  1. 75 FR 8563 - Safety Zone; Fleet Week Maritime Festival, Pier 66, Elliott Bay, Seattle, WA

    Science.gov (United States)

    2010-02-25

    ...-AA00 Safety Zone; Fleet Week Maritime Festival, Pier 66, Elliott Bay, Seattle, WA AGENCY: Coast Guard... Fleet Week Maritime Festival. This safety zone is necessary as these events have historically resulted... the safety of life and property on navigable waters during the annual Fleet Week Maritime Festival...

  2. Alternative Fuels Data Center: New Hampshire Fleet Revs up With Natural Gas

    Science.gov (United States)

    New Hampshire Fleet Revs up With Natural Gas to someone by E-mail Share Alternative Fuels Data Center: New Hampshire Fleet Revs up With Natural Gas on Facebook Tweet about Alternative Fuels Data Center: New Hampshire Fleet Revs up With Natural Gas on Twitter Bookmark Alternative Fuels Data Center

  3. Guidance for Federal Agencies on Executive Order 13693 - Federal Fleet Management

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-01-02

    Document contains guidance on the federal fleet requirements of Executive Order 13693: Planning for Federal Sustainability in the Next Decade and helps federal agencies subject to the executive order develop an overall approach for reducing total fleet greenhouse gas (GHG) emissions and fleet-wide per-mile GHG emissions.

  4. Preference Handling for Artificial Intelligence

    OpenAIRE

    Goldsmith, Judy; University of Kentucky; Junker, Ulrich; ILOG

    2009-01-01

    This article explains the benefits of preferences for AI systems and draws a picture of current AI research on preference handling. It thus provides an introduction to the topics covered by this special issue on preference handling.

  5. Electric Vehicle Fleet Integration in the Danish EDISON Project

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Træholt, Chresten; Marra, Francesco

    2010-01-01

    The Danish EDISON project has been launched to investigate how a large fleet of electric vehicles (EVs) can be integrated in a way that supports the electric grid while benefitting both the individual car owners and society as a whole through reductions in CO2 emissions. The consortium partners...

  6. Scenario tree airline fleet planning for demand uncertainty

    NARCIS (Netherlands)

    Repko, M.G.J.; Lopes dos Santos, Bruno F.

    2017-01-01

    This paper proposes an innovative multi-period modeling approach to solve the airline fleet planning problem under demand uncertainty. The problem is modeled using a scenario tree approach. The tree is composed of nodes, which represent points of decision in multiple time stages of the planning

  7. Fleet Management Decision Making With Individual Aircraft Tracking Data

    NARCIS (Netherlands)

    Newcamp, Jeffrey; Verhagen, W.J.C.; Curran, R.

    2017-01-01

    Individual aircraft tracking data can be used by aircraft fleet managers to detect patterns in historical usage as a means to aid aging aircraft decision-making. This work tackles two aspects of applying these tracking data: investigating retirement patterns and assessing how base assignment can

  8. Report: EPA’s Fleet Management Program Needs Improvement

    Science.gov (United States)

    Report #15-P-0001, October 6, 2014. If oversight of the EPA’s fleet is not improved, the $6 million-per-year program could be ineffective and inefficient in supporting the agency’s mission and reporting data to the federal system.

  9. Solving the Liner Shipping Fleet Repositioning Problem with Cargo Flows

    DEFF Research Database (Denmark)

    Tierney, Kevin; Askelsdottir, Björg; Jensen, Rune Møller

    2015-01-01

    We solve a central problem in the liner shipping industry called the liner shipping fleet repositioning problem (LSFRP). The LSFRP poses a large financial burden on liner shipping firms. During repositioning, vessels are moved between routes in a liner shipping network. Liner carriers wish...

  10. Monitoring cod catches of the Dutch demersal fleet in 2016

    NARCIS (Netherlands)

    Hal, van R.; Machiels, M.A.M.

    2017-01-01

    This report presents the results of the cod monitoring program 2016. The research was commissioned by the Dutch Ministry of Economic Affairs within the EZ-program Beleidsondersteunend Onderzoek. Cod catches of the vessels in the fleet segments BT2 (beam trawl and pulse trawl) and TR (otter trawls

  11. Optimal charging schedule of an electric vehicle fleet

    DEFF Research Database (Denmark)

    Hu, Junjie; You, Shi; Østergaard, Jacob

    2011-01-01

    In this paper, we propose an approach to optimize the charging schedule of an Electric Vehicle (EV) fleet both taking into account spot price and individual EV driving requirement with the goal of minimizing charging costs. A flexible and suitable mathematic model is introduced to characterize...

  12. Applying Column Generation to the Discrete Fleet Planning Problem

    NARCIS (Netherlands)

    Bosman, M.G.C.; Bakker, Vincent; Molderink, Albert; Hurink, Johann L.; Smit, Gerardus Johannes Maria

    2010-01-01

    The paper discusses an Integer Linear Programming (ILP) formulation that describes the problem of planning the use of domestic distributed generators, under individual as well as fleet constraints. The planning problem comprises the assignment of time intervals during which the local generator must

  13. Using fleets of electric-drive vehicles for grid support

    International Nuclear Information System (INIS)

    Tomic, Jasna; Kempton, Willett

    2007-01-01

    Electric-drive vehicles can provide power to the electric grid when they are parked (vehicle-to-grid power). We evaluated the economic potential of two utility-owned fleets of battery-electric vehicles to provide power for a specific electricity market, regulation, in four US regional regulation services markets. The two battery-electric fleet cases are: (a) 100 Th.nk City vehicle and (b) 252 Toyota RAV4. Important variables are: (a) the market value of regulation services, (b) the power capacity (kW) of the electrical connections and wiring, and (c) the energy capacity (kWh) of the vehicle's battery. With a few exceptions when the annual market value of regulation was low, we find that vehicle-to-grid power for regulation services is profitable across all four markets analyzed. Assuming now more than current Level 2 charging infrastructure (6.6 kW) the annual net profit for the Th.nk City fleet is from US$ 7000 to 70,000 providing regulation down only. For the RAV4 fleet the annual net profit ranges from US$ 24,000 to 260,000 providing regulation down and up. Vehicle-to-grid power could provide a significant revenue stream that would improve the economics of grid-connected electric-drive vehicles and further encourage their adoption. It would also improve the stability of the electrical grid. (author)

  14. Optimal fleet conversion policy from a life cycle perspective

    International Nuclear Information System (INIS)

    Hyung Chul Kim; Ross, M.H.; Keoleian, G.A.

    2004-01-01

    Vehicles typically deteriorate with accumulating mileage and emit more tailpipe air pollutants per mile. Although incentive programs for scrapping old, high-emitting vehicles have been implemented to reduce urban air pollutants and greenhouse gases, these policies may create additional sales of new vehicles as well. From a life cycle perspective, the emissions from both the additional vehicle production and scrapping need to be addressed when evaluating the benefits of scrapping older vehicles. This study explores an optimal fleet conversion policy based on mid-sized internal combustion engine vehicles in the US, defined as one that minimizes total life cycle emissions from the entire fleet of new and used vehicles. To describe vehicles' lifetime emission profiles as functions of accumulated mileage, a series of life cycle inventories characterizing environmental performance for vehicle production, use, and retirement was developed for each model year between 1981 and 2020. A simulation program is developed to investigate ideal and practical fleet conversion policies separately for three regulated pollutants (CO, NMHC, and NO x ) and for CO 2 . According to the simulation results, accelerated scrapping policies are generally recommended to reduce regulated emissions, but they may increase greenhouse gases. Multi- objective analysis based on economic valuation methods was used to investigate trade-offs among emissions of different pollutants for optimal fleet conversion policies. (author)

  15. JSC Case Study: Fleet Experience with E-85 Fuel

    Science.gov (United States)

    Hummel, Kirck

    2009-01-01

    JSC has used E-85 as part of an overall strategy to comply with Presidential Executive Order 13423 and the Energy Policy Act. As a Federal fleet, we are required to reduce our petroleum consumption by 2 percent per year, and increase the use of alternative fuels in our vehicles. With the opening of our onsite dispenser in October 2004, JSC became the second federal fleet in Texas and the fifth NASA center to add E-85 fueling capability. JSC has a relatively small number of GSA Flex Fuel fleet vehicles at the present time (we don't include personal vehicles, or other contractor's non-GSA fleet), and there were no reasonably available retail E-85 fuel stations within a 15-minute drive or within five miles (one way). So we decided to install a small 1000 gallon onsite tank and dispenser. It was difficult to obtain a supplier due to our low monthly fuel consumption, and our fuel supplier contract has changed three times in less than five years. We experiences a couple of fuel contamination and quality control issues. JSC obtained good information on E-85 from the National Ethanol Vehicle Coalition (NEVC). We also spoke with Defense Energy Support Center, (DESC), Lawrence Berkeley Laboratory, and US Army Fort Leonard Wood. E-85 is a liquid fuel that is dispensed into our Flexible Fuel Vehicles identically to regular gasoline, so it was easy for our vehicle drivers to make the transition.

  16. Planning and forecasting demand for aircraft engines airline fleet

    Directory of Open Access Journals (Sweden)

    А.Г. Кучер

    2007-03-01

    Full Text Available  The questions of air-engines supply system processes analysis on the basis of order planning and air-engine demand forecasting of airline’s air fleet with the use of imitating simulation methods are considered.

  17. Alternative Fuels Data Center: Fleet Application for School Transportation

    Science.gov (United States)

    Propane Buses Jan. 26, 2016 Video thumbnail for Biodiesel Offers an Easy Alternative for Fleets Biodiesel thumbnail for Biodiesel Fuels Education in Alabama Biodiesel Fuels Education in Alabama May 1, 2012 Video School Transportation Videos on YouTube Video thumbnail for New Hampshire Cleans up with Biodiesel Buses

  18. The Liner Shipping Fleet Repositioning Problem with Cargo Flows

    DEFF Research Database (Denmark)

    Tierney, Kevin; Jensen, Rune Møller

    2012-01-01

    We solve an important problem for the liner shipping industry called the Liner Shipping Fleet Repositioning Problem (LSFRP). The LSFRP poses a large financial burden on liner shipping firms. During repositioning, vessels are moved between services in a liner shipping network. Shippers wish...

  19. The new regulations on handling the materials hazardous to water. Consequences for the operation of biowaste processing plants; Die neue Verordnung ueber Anlagen zum Umgang mit wassergefaehrdenden Stoffen. Konsequenzen fuer den Betrieb von Bioabfallbehandlungsanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Oexle, Anno [Koehler und Klett Rechtsanwaelte Partnerschaft, Koeln (Germany)

    2013-07-01

    The new regulations on the handling materials hazardous to water include the classification of materials and mixtures, the categorization of wastes, plant specific requirements: general requirements, specific requirements with respect to the capacity of fermentation residual storage.

  20. Crud handling circuit

    International Nuclear Information System (INIS)

    Smith, J.C.; Manuel, R.J.; McAllister, J.E.

    1981-01-01

    A process for handling the problems of crud formation during the solvent extraction of wet-process phosphoric acid, e.g. for uranium and rare earth removal, is described. It involves clarification of the crud-solvent mixture, settling, water washing the residue and treatment of the crud with a caustic wash to remove and regenerate the solvent. Applicable to synergistic mixtures of dialkylphosphoric acids and trialkylphosphine oxides dissolved in inert diluents and more preferably to the reductive stripping technique. (U.K.)

  1. Extreme coal handling

    Energy Technology Data Exchange (ETDEWEB)

    Bradbury, S; Homleid, D. [Air Control Science Inc. (United States)

    2004-04-01

    Within the journals 'Focus on O & M' is a short article describing modifications to coal handling systems at Eielson Air Force Base near Fairbanks, Alaska, which is supplied with power and heat from a subbituminous coal-fired central plant. Measures to reduce dust include addition of an enclosed recirculation chamber at each transfer point and new chute designs to reduce coal velocity, turbulence, and induced air. The modifications were developed by Air Control Science (ACS). 7 figs., 1 tab.

  2. Handling and transport problems (1960)

    International Nuclear Information System (INIS)

    Pomarola, J.; Savouyaud, J.

    1960-01-01

    I. The handling and transport of radioactive wastes involves the danger of irradiation and contamination. It is indispensable: - to lay down a special set of rules governing the removal and transport of wastes within centres or from one centre to another; - to give charge of this transportation to a group containing teams of specialists. The organisation, equipment and output of these teams is being examined. II. Certain materials are particularly dangerous to transport, and for these special vehicles and fixed installations are necessary. This is the case especially for the evacuation of very active liquids. A transport vehicle is described, consisting of a trailer tractor and a recipient holding 500 litres of liquid of which the activity can reach 1000 C/l; the decanting operation, the route to be followed by the vehicle, and the precautions taken are also described. (author) [fr

  3. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for Department of Veterans Affairs. James J. Peters VA Medical Center, Bronx, NY

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Intertek Testing Services, North America, Phoenix, AZ (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-10-01

    This report focuses on the Department of Veterans Affairs, James J. Peters VA Medical Center (VA - Bronx) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.

  4. PROBLEMS OF FORMATION OF RUSSIAN INNOVATIVE AGRICULTURAL TRACTORS FLEET

    Directory of Open Access Journals (Sweden)

    V. M. Kryazhkov

    2015-01-01

    Full Text Available Formation of tractors park and its perspective development are carried out on the basis of realization and improvement of the scientifically based types range constructed on a traction classification sign which conforms to requirements of agricultural production when performing two main conditions: full meeting the requirements for various standard sizes of tractors applicable to conditions of the corresponding zones of Russia and continuous reproduction and development of tractor fleet, both by quantity of efficient machinery and its structure. The developed types range practically runs the gamut of organizational and economic and climatic conditions, and also all range of forms of the organizations using machinery, beginning from individual consumers, small and large rent and contract collectives and finishing large-scale enterprises and their associations. Federal Service of State Statistics (Rosstat information about a steady tendency of fleet reduction was used for studying of regularities of development of tractor fleet. This information was added by analytical synthesis of data about the annual brand purchases in the Russian market of agricultural tractors. The developed database shows a share of the tractors in fleets of agricultural organizations, which are used over depreciation term, and also minimum necessary number of new machines introduction for formation of volume of tractors with limit age and the total quantity of tractors necessary for minimization of set of expenses. It was established that it is possible to estimate visually the developed quantitative and age structure of tractors fleet and to predict its development on prospect by worked out database representing set of annual tractors brand lines purchasing.

  5. Path Planning Algorithms for the Adaptive Sensor Fleet

    Science.gov (United States)

    Stoneking, Eric; Hosler, Jeff

    2005-01-01

    The Adaptive Sensor Fleet (ASF) is a general purpose fleet management and planning system being developed by NASA in coordination with NOAA. The current mission of ASF is to provide the capability for autonomous cooperative survey and sampling of dynamic oceanographic phenomena such as current systems and algae blooms. Each ASF vessel is a software model that represents a real world platform that carries a variety of sensors. The OASIS platform will provide the first physical vessel, outfitted with the systems and payloads necessary to execute the oceanographic observations described in this paper. The ASF architecture is being designed for extensibility to accommodate heterogenous fleet elements, and is not limited to using the OASIS platform to acquire data. This paper describes the path planning algorithms developed for the acquisition phase of a typical ASF task. Given a polygonal target region to be surveyed, the region is subdivided according to the number of vessels in the fleet. The subdivision algorithm seeks a solution in which all subregions have equal area and minimum mean radius. Once the subregions are defined, a dynamic programming method is used to find a minimum-time path for each vessel from its initial position to its assigned region. This path plan includes the effects of water currents as well as avoidance of known obstacles. A fleet-level planning algorithm then shuffles the individual vessel assignments to find the overall solution which puts all vessels in their assigned regions in the minimum time. This shuffle algorithm may be described as a process of elimination on the sorted list of permutations of a cost matrix. All these path planning algorithms are facilitated by discretizing the region of interest onto a hexagonal tiling.

  6. Human factors issues in fuel handling

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, J D; Iwasa-Madge, K M; Tucker, D A [Humansystems Inc., Milton, ON (Canada)

    1994-12-31

    The staff of the Atomic Energy Control Board wish to further their understanding of human factors issues of potential concern associated with fuel handling in CANDU nuclear power stations. This study contributes to that objective by analysing the role of human performance in the overall fuel handling process at Ontario Hydro`s Darlington Nuclear Generating Station, and reporting findings in several areas. A number of issues are identified in the areas of design, operating and maintenance practices, and the organizational and management environment. 1 fig., 4 tabs., 19 refs.

  7. Control panel handling of a nuclear simulator

    International Nuclear Information System (INIS)

    Martin Polo, F.; Jimenez Fraustro, L.A.; Banuelos Galindo, A.; Diamant Rubinstein, A.

    1985-01-01

    The handling of the control panels for a Nuclear Simulator for operating training is described. The control panels are handled by a set of intelligent controllers, each with at least two processors (8035 - Communications Controller and a 8085 - Master processor). The Controllers are connected to the main computers (Two dual processor Gould concept 32/6780 and a single processor Gould concept 32/6705) via serial asynchronous channels in a multidrop, star-like architecture. The controllers transmit to the main computers only the changes detected and receive the whole set of output variables as computed by the mathematical models of the Nuclear Plant

  8. Handling apparatus for a nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Shallenberger, J.M.; Hornak, L.P.; Desmarchais, W.E.

    1978-01-01

    An apparatus is disclosed for handling radioactive fuel assembly during transfer operations. The radioactive fuel assembly is drawn up into a shielding sleeve which substantially reduces the level of radioactivity immediately surrounding the sleeve thereby permitting direct access by operating personnel. The lifting assembly which draws the fuel assembly up within the shielding sleeve is mounted to and forms an integral part of the handling apparatus. The shielding sleeve accompanies the fuel assembly during all of the transfer operations

  9. Phase II Characterization Survey of the USNS Bridge (T-AOE 10), Military Sealift Fleet Support Command, Naval Station, Norfolk, Virginia

    Energy Technology Data Exchange (ETDEWEB)

    ALTIC, NICK A

    2012-08-30

    In March 2011, the USNS Bridge was deployed off northeastern Honshu, Japan with the carrier USS Ronald Reagan to assist with relief efforts after the 2011 Tōhoku earthquake and tsunami. During that time, the Bridge was exposed to air-borne radioactive materials leaking from the damaged Fukushima I Nuclear Power Plant. The proximity of the Bridge to the air-borne impacted area resulted in the contamination of the ship’s air-handling systems and the associated components, as well as potential contamination of other ship surfaces due to either direct intake/deposition or inadvertent spread from crew/operational activities. Preliminary surveys in the weeks after the event confirmed low-level contamination within the heating, ventilation, and air conditioning (HVAC) ductwork and systems, and engine and other auxiliary air intake systems. Some partial decontamination was performed at that time. In response to the airborne contamination event, Military Sealift Fleet Support Command (MSFSC) contracted Oak Ridge Associated Universities (ORAU), under provisions of the Oak Ridge Institute for Science and Education (ORISE) contract, to assess the radiological condition of the Bridge. Phase I identified contamination within the CPS filters, ventilation systems, miscellaneous equipment, and other suspect locations that could not accessed at that time (ORAU 2011b). Because the Bridge was underway during the characterization, all the potentially impacted systems/spaces could not be investigated. As a result, MSFSC contracted with ORAU to perform Phase II of the characterization, specifically to survey systems/spaces previously inaccessible. During Phase II of the characterization, the ship was in port to perform routine maintenance operations, allowing access to the previously inaccessible systems/spaces.

  10. Use of the renewable wind and photovoltaic sources, for the recharge of a fleet of electric taxis in Havana, Cuba

    International Nuclear Information System (INIS)

    Sánchez Torres, Yamir

    2017-01-01

    Electrification of the transportation sector seems to be one of the alternatives in terms of restriction of pollutant from that sector. However, it is necessary to study the GHG (Green House Gas) emissions from Generation Power Plants (EGPP) because could be more or less the same of that from the vehicles. Furthermore, Centralized GPP supply would result in distribution losses, bigger fuel consumption and more pollution. Thus, EVs development should be considered as a sustainable solution if powered by electricity systems with considerable share of Renewable Energy Sources (RES). In this paper, the study of the recharge of an EV taxi fleet during night, using photovoltaic and wind mills RES in Havana, Cuba, is analyzed. This work is aiming to find a feasible operational synergy between cited intermittent RES electricity generation and EVs taxi fleet recharge. (author)

  11. Handling hunger strikers.

    Science.gov (United States)

    1992-04-01

    Hunger strikes are being used increasingly and not only by those with a political point to make. Whereas in the past, hunger strikes in the United Kingdom seemed mainly to be started by terrorist prisoners for political purposes, the most recent was begun by a Tamil convicted of murder, to protest his innocence. In the later stages of his strike, before calling it off, he was looked after at the Hammersmith Hospital. So it is not only prison doctors who need to know how to handle a hunger strike. The following guidelines, adopted by the 43rd World Medical Assembly in Malta in November 1991, are therefore a timely reminder of the doctor's duties during a hunger strike.

  12. Plutonium safe handling

    International Nuclear Information System (INIS)

    Tvehlov, Yu.

    2000-01-01

    The abstract, prepared on the basis of materials of the IAEA new leadership on the plutonium safe handling and its storage (the publication no. 9 in the Safety Reports Series), aimed at presenting internationally acknowledged criteria on the radiation danger evaluation and summarizing the experience in the safe management of great quantities of plutonium, accumulated in the nuclear states, is presented. The data on the weapon-class and civil plutonium, the degree of its danger, the measures for provision of its safety, including the data on accident radiation consequences with the fission number 10 18 , are presented. The recommendations, making it possible to eliminate the super- criticality danger, as well as ignition and explosion, to maintain the tightness of the facility, aimed at excluding the radioactive contamination and the possibility of internal irradiation, to provide for the plutonium security, physical protection and to reduce irradiation are given [ru

  13. A model for store handling : potential for efficiency improvement

    NARCIS (Netherlands)

    Zelst, van S.M.; Donselaar, van K.H.; Woensel, van T.; Broekmeulen, R.A.C.M.; Fransoo, J.C.

    2005-01-01

    In retail stores, handling of products typically forms the largest share of the operational costs. The handling activities are mainly the stacking of the products on the shelves. While the impact of these costs on the profitability of a store is substantial, there are no models available of the

  14. Robotics and remote handling in the nuclear industry

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    This book presents the papers given at a conference on the use of remote handling equipment in nuclear facilities. Topics considered at the conference included dose reduction, artificial intelligence in nuclear plant maintenance, robotic welding, uncertainty covariances, reactor operation and inspection, reactor maintenance and repair, uranium mining, fuel fabrication, reactor component manufacture, irradiated fuel and radioactive waste management, and radioisotope handling.

  15. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the United States Forest Service: Caribou-Targhee National Forest

    Energy Technology Data Exchange (ETDEWEB)

    Stephen Schey; Jim Francfort; Ian Nienhueser

    2014-06-01

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for U.S. Department of Energy Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (ITSNA) to collect and evaluate data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization study. The Advanced Vehicle Testing Activity study seeks to collect and evaluate data to validate the utilization of advanced electric drive vehicle transportation. This report focuses on the Caribou-Targhee National Forest (CTNF) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements. ITSNA acknowledges the support of Idaho National Laboratory and CTNF for participation in the study. ITSNA is pleased to provide this report and is encouraged by enthusiasm and support from the Forest Service and CTNF personnel.

  16. Demonstration of Heavy Hybrid Diesel Fleet Vehicles

    Science.gov (United States)

    2016-03-01

    resort to alternative sources (i.e., tar sands , oil shale, and bitumen) to keep up with demand. These alternative sources are more costly to recover and...Along Event Category Comment Driveability - Abrupt transition from electric motor to engine - Limited acceleration - Engine may stall when driving up...hydraulic system is transparent to the operator, and is relatively maintenance free for the service team. Service training requirements are minimal due

  17. Effects of the European Community directive on lifting and handling practice.

    Science.gov (United States)

    Docker, S M

    1993-07-01

    The new legislation on lifting and handling requires the application of ergonomic principles to manual handling operations. A written assessment is required for all unavoidable manual handling operations which involve the risk of injury to employees. Employers are now expected to provide equipment to enable staff to avoid lifting heavy loads.

  18. Transport control of forest fuels by fleet manager, mobile terminals and GPS

    International Nuclear Information System (INIS)

    Sikanen, Lauri; Asikainen, Antti; Lehikoinen, Mikko

    2005-01-01

    Chip transportation is undertaken by private transportation enterprises that are contracted by a larger wood fuel trader. Compared with industrial roundwood supply the volumes and value of wood fuel supply are markedly lower. As a result, the possibilities to invest in information systems for transport management are limited. New portable, wireless communication techniques and internet-based systems for fleet management enable more cost-efficient control systems with low investment costs in hard and software and also low operating costs. Mobile handsets with GPS, digital road map display and global positioning systems (GPS) or general purpose radio service data transfer protocol can be used as mobile terminals in chippers and trucks. In addition, transport management personnel can use them to locate in-forest wood fuel storage piles into the map database as well as point suitable routing to the storage piles. In a pilot study, conducted in Central Finland, an internet based management tool, Arbonaut Fleet ManagerTM, was tailored for forest fuel supply chain management and trailed for three months. It was found that use of mobile handsets with GPS and map display assisted especially in exact location of in-forest wood fuel storage piles by managers. They assisted also trucks and chippers in navigation to storages and landings, but the screen was too small for reading during driving. The management system was found helpful in stock accounting and GPS-based vehicle tracking gave transportation distances directly for invoicing

  19. GeoTrac -- Producing fleet communications, asset control solutions and logistic tools

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2005-04-01

    GEOTrac, a Calgary-based company, that offers innovative solutions utilizing GPS, satellite and geomatic data technology in the areas of asset and fleet management, logistic tools and integrated solutions, is reviewed. The two-year-old company with a development staff of 12, has contracts with major energy companies in the Middle East, North America, Africa, China and Mexico. By integrating 30 low-earth orbit satellites, operated by Orbcomm, with GPS, leading -edge mapping and geomatic data technologies, GEOTrac provides world class communications and control solutions for assets in both urban and rural locations. The system is capable of providing up-to-the minute location data about every remote asset or vehicle in a fleet, including status reports, dispatch instructions and driving directions. Logistic tools and integrated solutions available from GEOTrac enable the simple management and visibility of equipment, vessels, containers and cargo within and into remote countries, as well as making possible remote diagnostic and storage tank level readings. In another development, advanced digital map solutions provide a suite of maps and geographic technologies for on-road and off-road driving directions, for identifying the location of services and destinations, and for creating strategic advantages by keeping up-to-date with specific company or other oilfield locations and activities.

  20. Remote technologies for handling spent fuel

    International Nuclear Information System (INIS)

    Ramakumar, M.S.

    1999-01-01

    The nuclear programme in India involves building and operating power and research reactors, production and use of isotopes, fabrication of reactor fuel, reprocessing of irradiated fuel, recovery of plutonium and uranium-233, fabrication of fuel containing plutonium-239, uranium-233, post-irradiation examination of fuel and hardware and handling solid and liquid radioactive wastes. Fuel that could be termed 'spent' in thermal reactors is a source for second generation fuel (plutonium and uranium-233). Therefore, it is only logical to extend remote techniques beyond handling fuel from thermal reactors to fuel from fast reactors, post-irradiation examination etc. Fabrication of fuel containing plutonium and uranium-233 poses challenges in view of restriction on human exposure to radiation. Hence, automation will serve as a step towards remotisation. Automated systems, both rigid and flexible (using robots) need to be developed and implemented. Accounting of fissile material handled by robots in local area networks with appropriate access codes will be possible. While dealing with all these activities, it is essential to pay attention to maintenance and repair of the facilities. Remote techniques are essential here. There are a number of commonalities in these requirements and so development of modularized subsystems, and integration of different configurations should receive attention. On a long-term basis, activities like decontamination, decommissioning of facilities and handling of waste generated have to be addressed. While robotized remote systems have to be designed for existing facilities, future designs of facilities should take into account total operation with robotic remote systems. (author)

  1. Fleet Numerical Meteorology and Oceanography Center support for GODAE

    Science.gov (United States)

    Dimitriou, D.; Sharfstein, P.; Ignaszewski, M.; Clancy, M.

    2003-04-01

    The U.S. Navy's Fleet Numerical Meteorology and Oceanography Center (FNMOC; see http://www.fnmoc.navy.mil/), located in Monterey, CA, is the lead activity within the U.S. Department of Defense (DoD) for numerical weather prediction and coupled air-sea modeling. FNMOC fulfills this role through means of a suite of sophisticated global and regional meteorological and oceanographic (METOC) models, extending from the top of the atmosphere to the bottom of the ocean, which is supported by one of the world's most complete real-time METOC databases. Fleet Numerical operates around-the-clock, 365 days per year and distributes METOC products to military and civilian users around the world, both ashore and afloat, through a variety of means, including a rapidly growing and innovative use of Web technology. FNMOC's customers include all branches of the Department of Defense (DoD), other government organizations such as the National Weather Service, private companies such as the Weather Channel, a number of colleges and universities, and the general public. FNMOC acquires and processes over 6 million METOC observations per day—creating one of the world's most comprehensive real-time databases of meteorological and oceanographic observations for assimilation into its models. FNMOC employs three primary models, the Navy Operational Global Atmospheric Prediction System (NOGAPS), the Coupled Ocean/Atmosphere Mesoscale Prediction System (COAMPS), and the WaveWatch III model (WW3), along with a number of specialized models and related applications. NOGAPS is a global weather model, driving nearly all other FNMOC models and applications in some fashion. COAMPS is a high-resolution regional model that has proved to be particularly valuable for forecasting weather and ocean conditions in highly complex coastal areas. WW3 is a state-of-the-art ocean wave model that is employed both globally and regionally in support of a wide variety of naval operations. Specialized models support and

  2. Remote handling equipment for CANDU retubing

    International Nuclear Information System (INIS)

    Crawford, G.S.; Lowe, H.

    1993-01-01

    Numet Engineering Ltd. has designed and supplied remote handling equipment for Ontario Hydro's retubing operation of its CANDU reactors at the Bruce Nuclear Generating Station. This equipment consists of ''Retubing Tool Carriers'' an'' Worktables'' which operate remotely or manually at the reactor face. Together they function to transport tooling to and from the reactor face, to position and support tooling during retubing operations, and to deliver and retrieve fuel channels and channel components. This paper presents the fundamentals of the process and discusses the equipment supplied in terms of its design, manufacturing, components and controls, to meet the functional and quality requirements of Ontario Hydro's retubing process. (author)

  3. Renewal of the French fleet of nuclear reactors

    International Nuclear Information System (INIS)

    Nifenecker, Herve

    2012-01-01

    While supposing the lifetime of all present PWR reactors would be extended to sixty years, the author compares two scenarios regarding the renewal of the French fleet of nuclear reactors: the first one over 40 years and the second one over 20 years. This renewal is based on the construction of EPR reactors at different rhythms. The author compares the associated production costs and assesses the exploitation costs. A renewal scenario over 40 years seems to give better results

  4. The ethanol heavy-duty truck fleet demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    This project was designed to test and demonstrate the use of a high- percentage ethanol-blended fuel in a fleet of heavy-duty, over-the- road trucks, paying particular attention to emissions, performance, and repair and maintenance costs. This project also represents the first public demonstration of the use of ethanol fuels as a viable alternative to conventional diesel fuel in heavy-duty engines.

  5. Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook (Book)

    Energy Technology Data Exchange (ETDEWEB)

    Daley, R. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ahdieh, N. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bentley, J. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-01-01

    A comprehensive Federal Fleet Management Handbook that builds upon the "Guidance for Federal Agencies on E.O. 13514 Section 12-Federal Fleet Management" and provides information to help fleet managers select optimal greenhouse gas and petroleum reduction strategies for each location, meeting or exceeding related fleet requirements, acquiring vehicles to support these strategies while minimizing fleet size and vehicle miles traveled, and refining strategies based on agency performance.

  6. The Fleet Application for Scheduling and Tracking (FAST) Management Website

    Science.gov (United States)

    Marrero-Perez, Radames J.

    2014-01-01

    The FAST application was designed to replace the paper and pen method of checking out and checking in GSA Vehicles at KSC. By innovating from a paper and pen based checkout system to a fully digital one, not only the resources wasted by printing the checkout forms have been reduced, but it also reduces significantly the time that users and fleet managers need to interact with the system as well as improving the record accuracy for each vehicle. The vehicle information is pulled from a centralized database server in the SPSDL. In an attempt to add a new feature to the FAST application, the author of this report (alongside the FAST developers) has been designing and developing the FAST Management Website. The GSA fleet managers had to rely on the FAST developers in order to add new vehicles, edit vehicles and previous transactions, or for generating vehicles reports. By providing an easy-to-use FAST Management Website portal, the GSA fleet managers are now able to easily move vehicles, edit records, and print reports.

  7. Ergonomics of disposable handles for minimally invasive surgery.

    Science.gov (United States)

    Büchel, D; Mårvik, R; Hallabrin, B; Matern, U

    2010-05-01

    The ergonomic deficiencies of currently available minimally invasive surgery (MIS) instrument handles have been addressed in many studies. In this study, a new ergonomic pistol handle concept, realized as a prototype, and two disposable ring handles were investigated according to ergonomic properties set by new European standards. In this study, 25 volunteers performed four practical tasks to evaluate the ergonomics of the handles used in standard operating procedures (e.g., measuring a suture and cutting to length, precise maneuvering and targeting, and dissection of a gallbladder). Moreover, 20 participants underwent electromyography (EMG) tests to measure the muscle strain they experienced while carrying out the basic functions (grasp, rotate, and maneuver) in the x, y, and z axes. The data measured included the number of errors, the time required for task completion, perception of pressure areas, and EMG data. The values for usability in the test were effectiveness, efficiency, and user satisfaction. Surveys relating to the subjective rating were completed after each task for each of the three handles tested. Each handle except the new prototype caused pressure areas and pain. Extreme differences in muscle strain could not be observed for any of the three handles. Experienced surgeons worked more quickly with the prototype when measuring and cutting a suture (approximately 20%) and during precise maneuvering and targeting (approximately 20%). On the other hand, they completed the dissection task faster with the handle manufactured by Ethicon. Fewer errors were made with the prototype in dissection of the gallbladder. In contrast to the handles available on the market, the prototype was always rated as positive by the volunteers in the subjective surveys. None of the handles could fulfil all of the requirements with top scores. Each handle had its advantages and disadvantages. In contrast to the ring handles, the volunteers could fulfil most of the tasks more

  8. Trends in Modern Exception Handling

    Directory of Open Access Journals (Sweden)

    Marcin Kuta

    2003-01-01

    Full Text Available Exception handling is nowadays a necessary component of error proof information systems. The paper presents overview of techniques and models of exception handling, problems connected with them and potential solutions. The aspects of implementation of propagation mechanisms and exception handling, their effect on semantics and general program efficiency are also taken into account. Presented mechanisms were adopted to modern programming languages. Considering design area, formal methods and formal verification of program properties we can notice exception handling mechanisms are weakly present what makes a field for future research.

  9. Controlled Hydrogen Fleet and Infrastructure Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Dr. Scott Staley

    2010-03-31

    the fuel provider, while viability of the vehicle requires an expected level of cost, comfort, safety and operation, especially driving range, that consumers require. This presents a classic 'chicken and egg' problem, which Ford believes can be solved with thoughtful implementation plans. The eighteen Ford Focus FCV vehicles that were operated for this demonstration project provided the desired real world experience. Some things worked better than expected. Most notable was the robustness and life of the fuel cell. This is thought to be the result of the full hybrid configuration of the drive system where the battery helps to overcome the performance reduction associated with time related fuel cell degradation. In addition, customer satisfaction surveys indicated that people like the cars and the concept and operated them with little hesitation. Although the demonstrated range of the cars was near 200 miles, operators felt constrained because of the lack of a number of conveniently located fueling stations. Overcoming this major concern requires overcoming a key roadblock, fuel storage, in a manner that permits sufficient quantity of fuel without sacrificing passenger or cargo capability. Fueling infrastructure, on the other hand, has been problematic. Only three of a planned seven stations were opened. The difficulty in obtaining public approval and local government support for hydrogen fuel, based largely on the fear of hydrogen that grew from past disasters and atomic weaponry, has inhibited progress and presents a major roadblock to implementation. In addition the cost of hydrogen production, in any of the methodologies used in this program, does not show a rapid reduction to commercially viable rates. On the positive side of this issue was the demonstrated safety of the fueling station, equipment and process. In the Ford program, there were no reported safety incidents.

  10. Solar powered hydrogen generating facility and hydrogen powered vehicle fleet. Final technical report, August 11, 1994--January 6, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Provenzano, J.J.

    1997-04-01

    This final report describes activities carried out in support of a demonstration of a hydrogen powered vehicle fleet and construction of a solar powered hydrogen generation system. The hydrogen generation system was permitted for construction, constructed, and permitted for operation. It is not connected to the utility grid, either for electrolytic generation of hydrogen or for compression of the gas. Operation results from ideal and cloudy days are presented. The report also describes the achievement of licensing permits for their hydrogen powered trucks in California, safety assessments of the trucks, performance data, and information on emissions measurements which demonstrate performance better than the Ultra-Low Emission Vehicle levels.

  11. Fuel handling grapple for nuclear reactor plants

    International Nuclear Information System (INIS)

    Rousar, D.L.

    1992-01-01

    This patent describes a fuel handling system for nuclear reactor plants. It comprises: a reactor vessel having an openable top and removable cover and containing therein, submerged in water substantially filling the reactor vessel, a fuel core including a multiplicity of fuel bundles formed of groups of sealed tube elements enclosing fissionable fuel assembled into units, the fuel handling system consisting essentially of the combination of: a fuel bundle handling platform movable over the open top of the reactor vessel; a fuel bundle handling mast extendable downward from the platform with a lower end projecting into the open top reactor vessel to the fuel core submerged in water; a grapple head mounted on the lower end of the mast provided with grapple means comprising complementary hooks which pivot inward toward each other to securely grasp a bail handle of a nuclear reactor fuel bundle and pivot backward away from each other to release a bail handle; the grapple means having a hollow cylindrical support shaft fixed within the grapple head with hollow cylindrical sleeves rotatably mounted and fixed in longitudinal axial position on the support shaft and each sleeve having complementary hooks secured thereto whereby each hook pivots with the rotation of the sleeve secured thereto; and the hollow cylindrical support shaft being provided with complementary orifices on opposite sides of its hollow cylindrical and intermediate to the sleeves mounted thereon whereby the orifices on both sides of the hollow cylindrical support shaft are vertically aligned providing a direct in-line optical viewing path downward there-through and a remote operator positioned above the grapple means can observe from overhead the area immediately below the grapple hooks

  12. Safety and radiation protection within the French electronuclear fleet in 2014. The IRSN's opinion

    International Nuclear Information System (INIS)

    2015-11-01

    This annual report concerns the 58 pressurized water reactors of the French electronuclear fleet which are currently being operated. After a presentation of this fleet, and a discussion of the global assessment of safety and radiation protection within this fleet (discussion of the noticed trends), this document first reports the analysis performed by the IRSN of some important events and anomalies which occurred in 2014: the presence of migrating elements in the primary circuit which resulted in the damage fuel assembly sheaths (in Saint-Laurent des Eaux), the spraying of electric equipment due to a water flow from leaky hoppers, and the risk of unavailability of important equipment due to a high temperature in the room of the emergency back-up turbo generator set. The next chapter comments significant evolutions: renewal of the command-control system for the 1300 MWe reactors, risks induced on the Gravelines nuclear plant site by the exploitation of the Dunkirk methane terminal, and internal EDF arbitrages related to declarations regarding events which occurred in Val de Loire nuclear plants. These evolutions illustrate how expertises performed by the IRSN on request by the ASN complement EDF expertises and are a contribution to the improvement of installation safety

  13. Fission reactor recycling pump handling device

    International Nuclear Information System (INIS)

    Togasawa, Hiroshi; Komita, Hideo; Susuki, Shoji; Endo, Takio; Yamamoto, Tetsuzo; Takahashi, Hideaki; Saito, Noboru.

    1991-01-01

    This invention provides a device for handling a recycling pump in a nuclear reactor upon periodical inspections in a BWR type power plant. That is, in a handling device comprising a support for supporting components of a recycling pump, and a lifter for vertically moving the support below a motor case disposed passing through a reactor pressure vessel, a weight is disposed below the support. Then, the center of gravity of the components, the support and the entire weight is substantially aligned with the position for the support. With such a constitution, the components can be moved vertically to the motor case extremely safely, to remarkably suppress vibrations. Further, the operation safety can remarkably be improved by preventing turning down upon occurrence of earthquakes. Further, since vibration-proof jigs as in a prior art can be saved, operation efficiency can be improved. (I.S.)

  14. Fission reactor recycling pump handling device

    Energy Technology Data Exchange (ETDEWEB)

    Togasawa, Hiroshi; Komita, Hideo; Susuki, Shoji; Endo, Takio; Yamamoto, Tetsuzo; Takahashi, Hideaki; Saito, Noboru

    1991-06-24

    This invention provides a device for handling a recycling pump in a nuclear reactor upon periodical inspections in a BWR type power plant. That is, in a handling device comprising a support for supporting components of a recycling pump, and a lifter for vertically moving the support below a motor case disposed passing through a reactor pressure vessel, a weight is disposed below the support. Then, the center of gravity of the components, the support and the entire weight is substantially aligned with the position for the support. With such a constitution, the components can be moved vertically to the motor case extremely safely, to remarkably suppress vibrations. Further, the operation safety can remarkably be improved by preventing turning down upon occurrence of earthquakes. Further, since vibration-proof jigs as in a prior art can be saved, operation efficiency can be improved. (I.S.).

  15. Remote Inspection, Measurement and Handling for LHC

    CERN Document Server

    Kershaw, K; Coin, A; Delsaux, F; Feniet, T; Grenard, J L; Valbuena, R

    2007-01-01

    Personnel access to the LHC tunnel will be restricted to varying extents during the life of the machine due to radiation, cryogenic and pressure hazards. The ability to carry out visual inspection, measurement and handling activities remotely during periods when the LHC tunnel is potentially hazardous offers advantages in terms of safety, accelerator down time, and costs. The first applications identified were remote measurement of radiation levels at the start of shut-down, remote geometrical survey measurements in the collimation regions, and remote visual inspection during pressure testing and initial machine cool-down. In addition, for remote handling operations, it will be necessary to be able to transmit several real-time video images from the tunnel to the control room. The paper describes the design, development and use of a remotely controlled vehicle to demonstrate the feasibility of meeting the above requirements in the LHC tunnel. Design choices are explained along with operating experience to-dat...

  16. Powder handling for automated fuel processing

    International Nuclear Information System (INIS)

    Frederickson, J.R.; Eschenbaum, R.C.; Goldmann, L.H.

    1989-01-01

    Installation of the Secure Automated Fabrication (SAF) line has been completed. It is located in the Fuel Cycle Plant (FCP) at the Department of Energy's (DOE) Hanford site near Richland, Washington. The SAF line was designed to fabricate advanced reactor fuel pellets and assemble fuel pins by automated, remote operation. This paper describes powder handling equipment and techniques utilized for automated powder processing and powder conditioning systems in this line. 9 figs

  17. Safety measuring for sodium handling

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Ji Young; Jeong, K C; Kim, T J; Kim, B H; Choi, J H

    2001-09-01

    This is the report for the safety measures of sodium handling. These contents are prerequisites for the development of sodium technology and thus the workers participate in sodium handling and experiments have to know them perfectly. As an appendix, the relating parts of the laws are presented.

  18. WASTE HANDLING BUILDING FIRE PROTECTION SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    J. D. Bigbee

    2000-06-21

    The Waste Handling Building Fire Protection System provides the capability to detect, control, and extinguish fires and/or mitigate explosions throughout the Waste Handling Building (WHB). Fire protection includes appropriate water-based and non-water-based suppression, as appropriate, and includes the distribution and delivery systems for the fire suppression agents. The Waste Handling Building Fire Protection System includes fire or explosion detection panel(s) controlling various detectors, system actuation, annunciators, equipment controls, and signal outputs. The system interfaces with the Waste Handling Building System for mounting of fire protection equipment and components, location of fire suppression equipment, suppression agent runoff, and locating fire rated barriers. The system interfaces with the Waste Handling Building System for adequate drainage and removal capabilities of liquid runoff resulting from fire protection discharges. The system interfaces with the Waste Handling Building Electrical Distribution System for power to operate, and with the Site Fire Protection System for fire protection water supply to automatic sprinklers, standpipes, and hose stations. The system interfaces with the Site Fire Protection System for fire signal transmission outside the WHB as needed to respond to a fire emergency, and with the Waste Handling Building Ventilation System to detect smoke and fire in specific areas, to protect building high-efficiency particulate air (HEPA) filters, and to control portions of the Waste Handling Building Ventilation System for smoke management and manual override capability. The system interfaces with the Monitored Geologic Repository (MGR) Operations Monitoring and Control System for annunciation, and condition status.

  19. WASTE HANDLING BUILDING FIRE PROTECTION SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    J. D. Bigbee

    2000-01-01

    The Waste Handling Building Fire Protection System provides the capability to detect, control, and extinguish fires and/or mitigate explosions throughout the Waste Handling Building (WHB). Fire protection includes appropriate water-based and non-water-based suppression, as appropriate, and includes the distribution and delivery systems for the fire suppression agents. The Waste Handling Building Fire Protection System includes fire or explosion detection panel(s) controlling various detectors, system actuation, annunciators, equipment controls, and signal outputs. The system interfaces with the Waste Handling Building System for mounting of fire protection equipment and components, location of fire suppression equipment, suppression agent runoff, and locating fire rated barriers. The system interfaces with the Waste Handling Building System for adequate drainage and removal capabilities of liquid runoff resulting from fire protection discharges. The system interfaces with the Waste Handling Building Electrical Distribution System for power to operate, and with the Site Fire Protection System for fire protection water supply to automatic sprinklers, standpipes, and hose stations. The system interfaces with the Site Fire Protection System for fire signal transmission outside the WHB as needed to respond to a fire emergency, and with the Waste Handling Building Ventilation System to detect smoke and fire in specific areas, to protect building high-efficiency particulate air (HEPA) filters, and to control portions of the Waste Handling Building Ventilation System for smoke management and manual override capability. The system interfaces with the Monitored Geologic Repository (MGR) Operations Monitoring and Control System for annunciation, and condition status

  20. Fuel handling problems at KANUPP

    Energy Technology Data Exchange (ETDEWEB)

    Ahmed, I; Mazhar Hasan, S; Mugtadir, A [Karachi Nuclear Power Plant (KANUPP), Karachi (Pakistan)

    1991-04-01

    KANUPP experienced two abnormal fuel and fuel handling related problems during the year 1990. One of these had arisen due to development of end plate to end plate coupling between the two bundles at the leading end of the fuel string in channel HO2-S. The incident occurred when attempts were being made to fuel this channel. Due to pulling of sticking bundles into the acceptor fuelling machine (north) magazine, which was not designed to accommodate two bundles, a magazine rotary stop occurred. The forward motion of the charge tube was simultaneously discovered to be restricted. The incident led to stalling of fuelling machine locked on to the channel HO2, necessitating a reactor shut down. Removal of the fuelling machine was accomplished sometime later after draining of the channel. The second incident which made the fuelling of channel KO5-N temporarily inexecutable, occurred during attempts to remove its north end shield plug when this channel came up for fuelling. The incident resulted due to breaking of the lugs of the shield plug, making its withdrawal impossible. The Plant however kept operating with suspended fuelling of channel KO5, until it could no longer sustain a further increase in fuel burnup at the maximum rating position. Resolving both these problems necessitated draining of the respective channels, leaving the resident fuel uncovered for the duration of the associated operation. Due to substantial difference in the oxidation temperatures Of UO{sub 2} and Zircaloy and its influence as such on the cooling requirement, it was necessary either to determine explicitly that the respective channels did not contain defective fuel bundles or wait for time long enough to allow the decay heat to reduce to manageable proportions. This had a significant bearing on the Plant down time necessary for the rectification of the problems. This paper describes the two incidents in detail and dwells upon the measures adopted to resolve the related problems. (author)

  1. Fuel handling problems at KANUPP

    International Nuclear Information System (INIS)

    Ahmed, I.; Mazhar Hasan, S.; Mugtadir, A.

    1991-01-01

    KANUPP experienced two abnormal fuel and fuel handling related problems during the year 1990. One of these had arisen due to development of end plate to end plate coupling between the two bundles at the leading end of the fuel string in channel HO2-S. The incident occurred when attempts were being made to fuel this channel. Due to pulling of sticking bundles into the acceptor fuelling machine (north) magazine, which was not designed to accommodate two bundles, a magazine rotary stop occurred. The forward motion of the charge tube was simultaneously discovered to be restricted. The incident led to stalling of fuelling machine locked on to the channel HO2, necessitating a reactor shut down. Removal of the fuelling machine was accomplished sometime later after draining of the channel. The second incident which made the fuelling of channel KO5-N temporarily inexecutable, occurred during attempts to remove its north end shield plug when this channel came up for fuelling. The incident resulted due to breaking of the lugs of the shield plug, making its withdrawal impossible. The Plant however kept operating with suspended fuelling of channel KO5, until it could no longer sustain a further increase in fuel burnup at the maximum rating position. Resolving both these problems necessitated draining of the respective channels, leaving the resident fuel uncovered for the duration of the associated operation. Due to substantial difference in the oxidation temperatures Of UO 2 and Zircaloy and its influence as such on the cooling requirement, it was necessary either to determine explicitly that the respective channels did not contain defective fuel bundles or wait for time long enough to allow the decay heat to reduce to manageable proportions. This had a significant bearing on the Plant down time necessary for the rectification of the problems. This paper describes the two incidents in detail and dwells upon the measures adopted to resolve the related problems. (author)

  2. Initial development of a practical safety audit tool to assess fleet safety management practices.

    Science.gov (United States)

    Mitchell, Rebecca; Friswell, Rena; Mooren, Lori

    2012-07-01

    Work-related vehicle crashes are a common cause of occupational injury. Yet, there are few studies that investigate management practices used for light vehicle fleets (i.e. vehicles less than 4.5 tonnes). One of the impediments to obtaining and sharing information on effective fleet safety management is the lack of an evidence-based, standardised measurement tool. This article describes the initial development of an audit tool to assess fleet safety management practices in light vehicle fleets. The audit tool was developed by triangulating information from a review of the literature on fleet safety management practices and from semi-structured interviews with 15 fleet managers and 21 fleet drivers. A preliminary useability assessment was conducted with 5 organisations. The audit tool assesses the management of fleet safety against five core categories: (1) management, systems and processes; (2) monitoring and assessment; (3) employee recruitment, training and education; (4) vehicle technology, selection and maintenance; and (5) vehicle journeys. Each of these core categories has between 1 and 3 sub-categories. Organisations are rated at one of 4 levels on each sub-category. The fleet safety management audit tool is designed to identify the extent to which fleet safety is managed in an organisation against best practice. It is intended that the audit tool be used to conduct audits within an organisation to provide an indicator of progress in managing fleet safety and to consistently benchmark performance against other organisations. Application of the tool by fleet safety researchers is now needed to inform its further development and refinement and to permit psychometric evaluation. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. A concise guide to effective management of the public works equipment fleet

    OpenAIRE

    De Armas, Vicente.

    1996-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited The purpose of this report is to present in a concise form the principles and fundamentals of managing the public works equipment fleet, providing a basis from which to develop an effective fleet management program. The report begins with a review of today's trends in fleet management, including, organization, privatization, effects of environmental regulations and a discussion on info...

  4. Telematics Framework for Federal Agencies: Lessons from the Marine Corps Fleet

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, Cabell [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Singer, Mark R. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-10-24

    Executive Order 13693 requires federal agencies to acquire telematics for their light- and medium-duty vehicles as appropriate. This report is intended to help agencies that are deploying telematics systems and seeking to integrate them into their fleet management process. It provides an overview of telematics capabilities, lessons learned from the deployment of telematics in the Marine Corps fleet, and recommendations for federal fleet managers to maximize value from telematics.

  5. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    OpenAIRE

    Feng, Qiang; Li, Songjie; Sun, Bo

    2014-01-01

    A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance...

  6. Fleet Purchase Behavior: Decision Processes and Implications for New Vehicle Technologies and Fuels

    OpenAIRE

    Nesbitt, Kevin; Sperling, Daniel

    2001-01-01

    Vehicle fleets are a poorly understood part of the economy. They are important, though, in that they purchase a large share of light-duty vehicles and are often targeted by governments as agents of change. We investigate fleet purchase behavior, using focus groups, interviews, and mail and telephone surveys. We categorize fleets into four different decision-making structures (autocratic, bureaucratic, hierarchic, and democratic), determine what share of the market sector each represents, d...

  7. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA Stennis Space Center

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Idaho National Lab. (INL), Idaho Falls, ID (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    Federal agencies are mandated to purchase alternative fuel vehicles, increase consumption of alternative fuels, and reduce petroleum consumption. Available plug-in electric vehicles (PEVs) provide an attractive option in the selection of alternative fuel vehicles. PEVs, which consist of both battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), have significant advantages over internal combustion engine (ICE) vehicles in terms of energy efficiency, reduced petroleum consumption, and reduced production of greenhouse gas (GHG) emissions, and they provide performance benefits with quieter, smoother operation. This study intended to evaluate the extent to which NASA Stennis Space Center (Stennis) could convert part or all of their fleet of vehicles from petroleum-fueled vehicles to PEVs.

  8. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for United States Coast Guard Headquarters

    Energy Technology Data Exchange (ETDEWEB)

    Schey, Stephen [Idaho National Lab. (INL), Idaho Falls, ID (United States); Francfort, Jim [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    Federal agencies are mandated to purchase alternative fuel vehicles, increase consumption of alternative fuels, and reduce petroleum consumption. Available plug-in electric vehicles (PEVs) provide an attractive option in the selection of alternative fuel vehicles. PEVs, which consist of both battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), have significant advantages over internal combustion engine (ICE) vehicles in terms of energy efficiency, reduced petroleum consumption, and reduced production of greenhouse gas (GHG) emissions, and they provide performance benefits with quieter, smoother operation. This study intended to evaluate the extent to which the United States Coast Guard Headquarters (USCG HQ) could convert part or all of their fleet of vehicles from petroleum-fueled vehicles to PEVs.

  9. Handling of sodium for the FFTF

    International Nuclear Information System (INIS)

    Ballif, J.L.; Meadows, G.E.

    1978-06-01

    Based on the High Temperature Sodium Facility (HTSF) experience and the extensive design efforts for FFTF, procedures are in place for the unloading of the tank cars and for the fill of the FFTF reactor. Special precautions have been taken to provide safe handling and to accommodate contingencies in operation. These contingencies include special protective suits allowing personnel to enter and correct conditions arising from fill operations in the course of moving 7.71 x 10 5 kg (1.7 x 10 6 lbs) of sodium from the tank cars into the reactor vessel and its loop system

  10. Solution for remote handling in accelerator installations

    International Nuclear Information System (INIS)

    Burgerjon, J.J.; Ekberg, E.L.; Grisham, D.L.; Horne, R.A.; Meyer, R.E.; Flatau, C.R.; Wilson, K.B.

    1977-01-01

    A description is given of a remote-handling system designed for the Los Alamos Clinton P. Anderson Meson Physics Facility (LAMPF), versatile enough to be used in a variety of situations found around particle accelerators. The system consists of a bilateral (force-reflecting) servomanipulator installed on an articulated hydraulic boom. The boom also carries the necessary tools and observation devices. The whole slave unit can be moved by crane or truck to the area of operation. A control cable connects the slave unit with the control station, located at a safe distance in a trailer. Various stages of development as well as some operating experience are discussed

  11. A Framework for Creating Value from Fleet Data at Ecosystem Level

    Science.gov (United States)

    Kinnunen, Sini-Kaisu; Hanski, Jyri; Marttonen-Arola, Salla; Kärri, Timo

    2017-09-01

    As companies have recently gotten more interested in utilizing the increasingly gathered data and realizing the potential of data analysis, the ability to upgrade data into value for business has been recognized as an advantage. Companies gain competitive advantage if they are able to benefit from the fleet data that is produced both in and outside the boundaries of the company. Benefits of fleet management are based on the possibility to have access to the massive amounts of asset data that can then be utilized e.g. to gain cost savings and to develop products and services. The ambition of the companies is to create value from fleet data but this requires that different actors in ecosystem are working together for a common goal - to get the most value out of fleet data for the ecosystem. In order that this could be possible, we need a framework to meet the requirements of the fleet life-cycle data utilization. This means that the different actors in the ecosystem need to understand their role in the fleet data refining process in order to promote the value creation from fleet data. The objective of this paper is to develop a framework for knowledge management in order to create value from fleet data in ecosystems. As a result, we present a conceptual framework which helps companies to develop their asset management practices related to the fleet of assets.

  12. A FRAMEWORK FOR CREATING VALUE FROM FLEET DATA AT ECOSYSTEM LEVEL

    Directory of Open Access Journals (Sweden)

    Sini-Kaisu KINNUNEN

    2017-07-01

    Full Text Available As companies have recently gotten more interested in utilizing the increasingly gathered data and realizing the potential of data analysis, the ability to upgrade data into value for business has been recognized as an advantage. Companies gain competitive advantage if they are able to benefit from the fleet data that is produced both in and outside the boundaries of the company. Benefits of fleet management are based on the possibility to have access to the massive amounts of asset data that can then be utilized e.g. to gain cost savings and to develop products and services. The ambi-tion of the companies is to create value from fleet data but this requires that different actors in ecosystem are working together for a common goal – to get the most value out of fleet data for the ecosystem. In order that this could be possi-ble, we need a framework to meet the requirements of the fleet life-cycle data utilization. This means that the different actors in the ecosystem need to understand their role in the fleet data refining process in order to promote the value creation from fleet data. The objective of this paper is to develop a framework for knowledge management in order to create value from fleet data in ecosystems. As a result, we present a conceptual framework which helps companies to develop their asset management practices related to the fleet of assets.

  13. Analysis of Fleet Readiness Center Southwest Concept Integration: New-Employee Orientation and Communication Processes

    National Research Council Canada - National Science Library

    Clemmons, Francini R; Falconieri, Holly M

    2007-01-01

    Fleet Readiness Center Southwest has embraced integration of personnel and processes from Aircraft Intermediate Maintenance Departments and Naval Aviation Depots supporting Naval Aviation Maintenance...

  14. A systems engineering approach to implementation of safety management systems in the Norwegian fishing fleet

    International Nuclear Information System (INIS)

    McGuinness, Edgar; Utne, Ingrid B.

    2014-01-01

    The fishing industry is plagued by a long history of fatality and injury occurrence. Commercial fishing is hence recognized as the most dangerous and difficult of professional callings, in all jurisdictions. Fishing vessels have their own unique set of hazards, a myriad collection of complex occupational accident potentials, barely controlled, co-existing in a perilous work environment. The work in this article is directed by the Norwegian Systematic Health, Environmental and Safety Activities in Enterprises (1997) (Internal Control Regulations [1]), the ISM Code [2] for vessels and their recent applicability to the fishing fleet of Norway. Both safety management works place requirements on the vessel operators and crew to actively manage safety as an on-going concern. The application of these safety management system (SMS) control documents to fishing vessels is just the latest instalment in a continual drive to improve safety in this sector. The difficulty is that there has been no previous systematic approach to safety within the fishing fleet. This article uses the tenants of systems engineering to determine the requirements for such a SMS, detailing the limiting factors and restrictive issues of this complex operating environment. - Highlights: • Systems engineer is applied as a tool for determining requirements for design and construction of a safety management system (SMS). • Outlining a simplistic format, identifying, designingand facilitating improvement opportunities in the conduction and application of SMS’s on fishing vessels. • Knowledge provision is a key requirement of management systems, through provision of understanding, detail orientation and applicable skills for realization. • Outlining, what is to be done and how it is to be completed to accomplish compliance with pertinent legislative requirements. • Promoting a combination of documentation and communication arrangements by which the actionsnecessary for management can be

  15. Hot Laboratories and Remote Handling

    International Nuclear Information System (INIS)

    Bart, G.; Blanc, J.Y.; Duwe, R.

    2003-01-01

    The European Working Group on ' Hot Laboratories and Remote Handling' is firmly established as the major contact forum for the nuclear R and D facilities at the European scale. The yearly plenary meetings intend to: - Exchange experience on analytical methods, their implementation in hot cells, the methodologies used and their application in nuclear research; - Share experience on common infrastructure exploitation matters such as remote handling techniques, safety features, QA-certification, waste handling; - Promote normalization and co-operation, e.g., by looking at mutual complementarities; - Prospect present and future demands from the nuclear industry and to draw strategic conclusions regarding further needs. The 41. plenary meeting was held in CEA Saclay from September 22 to 24, 2003 in the premises and with the technical support of the INSTN (National Institute for Nuclear Science and Technology). The Nuclear Energy Division of CEA sponsored it. The Saclay meeting was divided in three topical oral sessions covering: - Post irradiation examination: new analysis methods and methodologies, small specimen technology, programmes and results; - Hot laboratory infrastructure: decommissioning, refurbishment, waste, safety, nuclear transports; - Prospective research on materials for future applications: innovative fuels (Generation IV, HTR, transmutation, ADS), spallation source materials, and candidate materials for fusion reactor. A poster session was opened to transport companies and laboratory suppliers. The meeting addressed in three sessions the following items: Session 1 - Post Irradiation Examinations. Out of 12 papers (including 1 poster) 7 dealt with surface and solid state micro analysis, another one with an equally complex wet chemical instrumental analytical technique, while the other four papers (including the poster) presented new concepts for digital x-ray image analysis; Session 2 - Hot laboratory infrastructure (including waste theme) which was

  16. Production management of window handles

    Directory of Open Access Journals (Sweden)

    Manuela Ingaldi

    2014-12-01

    Full Text Available In the chapter a company involved in the production of aluminum window and door handles was presented. The main customers of the company are primarily companies which produce PCV joinery and wholesalers supplying these companies. One chosen product from the research company - a single-arm pin-lift window handle - was described and its production process depicted technologically. The chapter also includes SWOT analysis conducted in the research company and the value stream of the single-arm pin-lift window handle.

  17. Remote handling systems for the Pride application

    International Nuclear Information System (INIS)

    Kim, K.; Lee, J.; Lee, H.; Kim, S.; Kim, H.

    2010-10-01

    In this paper is described the development of remote handling systems for use in the pyro processing technology development. Remote handling systems mainly include a BDSM (Bridge transported Dual arm Servo-Manipulator) and a simulator, all of which will be applied to the Pride (Pyro process integrated inactive demonstration facility) that is under construction at KAERI. BDMS that will traverse the length of the ceiling is designed to have two pairs of master-slave manipulators of which each pair of master-slave manipulators has a kinematic similarity and a force reflection. A simulator is also designed to provide an efficient means for simulating and verifying the conceptual design, developments, arrangements, and rehearsal of the pyro processing equipment and relevant devices from the viewpoint of remote operation and maintenance. In our research is presented activities and progress made in developing remote handling systems to be used for the remote operation and maintenance of the pyro processing equipment and relevant devices in the Pride. (Author)

  18. ITER L 6 equatorial maintenance duct remote handling study

    International Nuclear Information System (INIS)

    Millard, J.

    1996-09-01

    The status and conclusions of a preliminary study of equatorial maintenance duct remote handling is reported. Due to issues with the original duct design a significant portion of the study had to be refocused on equatorial duct layout studies. The study gives an overview of some of the options for design of these ducts and the impact of the design on the equipment to work in the duct. To develop a remote handling concept for creating access through the ducts the following design tasks should be performed: define the operations sequences for equatorial maintenance duct opening and closing; review the remote handling requirements for equatorial maintenance duct opening and closing; design concept for door and pipe handling equipment and to propose preliminary procedures for material handling outsides the duct. 35 figs

  19. Cellular Manufacturing System with Dynamic Lot Size Material Handling

    Science.gov (United States)

    Khannan, M. S. A.; Maruf, A.; Wangsaputra, R.; Sutrisno, S.; Wibawa, T.

    2016-02-01

    Material Handling take as important role in Cellular Manufacturing System (CMS) design. In several study at CMS design material handling was assumed per pieces or with constant lot size. In real industrial practice, lot size may change during rolling period to cope with demand changes. This study develops CMS Model with Dynamic Lot Size Material Handling. Integer Linear Programming is used to solve the problem. Objective function of this model is minimizing total expected cost consisting machinery depreciation cost, operating costs, inter-cell material handling cost, intra-cell material handling cost, machine relocation costs, setup costs, and production planning cost. This model determines optimum cell formation and optimum lot size. Numerical examples are elaborated in the paper to ilustrate the characterictic of the model.

  20. Quality assurance in a cask fleet parts control system

    International Nuclear Information System (INIS)

    Fernandez, C.; Shappert, L.B.

    1992-01-01

    This paper discusses applicable portions of the eighteen Quality Assurance criteria of Subpart H, 10 CFR 71 which are incorporated into a relational data base system which has been designed to manage the spare parts control system for a fleet of spent nuclear fuel casks. The system includes not only parts in warehouse storage but parts in use in the field plus casks, ancillary equipment, test equipment, support devices, and even personnel. It provides a high degree of assurance that any device for which a condition for certification has expired will be flagged for recertification testing or removal from service well before the critical date