WorldWideScience

Sample records for handling control system

  1. WWER NPPs fuel handling machine control system

    International Nuclear Information System (INIS)

    Mini, G.; Rossi, G.; Barabino, M.; Casalini, M.

    2001-01-01

    In order to increase the safety level of the fuel handling machine on WWER NPPs, Ansaldo Nucleare was asked to design and supply a new Control System. Two FHM Control System units have been already supplied for Temelin NPP and others supplies are in process for the Atommash company, which has in charge the supply of FHMs for NPPs located in Russia, Ukraine and China. The Fuel Handling Machine (FHM) Control System is an integrated system capable of a complete management of nuclear fuel assemblies. The computer-based system takes into account all the operational safety interlocks so that it is able to avoid incorrect and dangerous manoeuvres in the case of operator error. Control system design criteria, hardware and software architecture, and quality assurance control, are in accordance with the most recent international requirements and standards, and in particular for electromagnetic disturbance immunity demands and seismic compatibility. The hardware architecture of the control system is based on ABB INFI 90 system. The microprocessor-based ABB INFI 90 system incorporates and improves upon many of the time proven control capabilities of Bailey Network 90, validated over 14,000 installations world-wide. The control system complies all the former designed sensors and devices of the machine and markedly the angular position measurement sensors named 'selsyn' of Russian design. Nevertheless it is fully compatible with all the most recent sensors and devices currently available on the market (for ex. Multiturn absolute encoders). All control logic components were developed using standard INFI 90 Engineering Work Station, interconnecting blocks extracted from an extensive SAMA library by using a graphical approach (CAD) and allowing an easier intelligibility, more flexibility and updated and coherent documentation. The data acquisition system and the Man Machine Interface are implemented by ABB in co-operation with Ansaldo. The flexible and powerful software structure

  2. VVER NPPs fuel handling machine control system

    International Nuclear Information System (INIS)

    Mini, G.; Rossi, G.; Barabino, M.; Casalini, M.

    2002-01-01

    In order to increase the safety level of the fuel handling machine on WWER NPPs, Ansaldo Nucleare was asked to design and supply a new Control System. Two Fuel Handling Machine (FHM) Control System units have been already supplied for Temelin NPP and others supply are in process for the Atommash company, which has in charge the supply of FHMs for NPPs located in Russia, Ukraine and China.The computer-based system takes into account all the operational safety interlocks so that it is able to avoid incorrect and dangerous manoeuvres in the case of operator error. Control system design criteria, hardware and software architecture, and quality assurance control, are in accordance with the most recent international requirements and standards, and in particular for electromagnetic disturbance immunity demands and seismic compatibility. The hardware architecture of the control system is based on ABB INFI 90 system. The microprocessor-based ABB INFI 90 system incorporates and improves upon many of the time proven control capabilities of Bailey Network 90, validated over 14,000 installations world-wide.The control system complies all the former designed sensors and devices of the machine and markedly the angular position measurement sensors named 'selsyn' of Russian design. Nevertheless it is fully compatible with all the most recent sensors and devices currently available on the market (for ex. Multiturn absolute encoders).All control logic were developed using standard INFI 90 Engineering Work Station, interconnecting blocks extracted from an extensive SAMA library by using a graphical approach (CAD) and allowing and easier intelligibility, more flexibility and updated and coherent documentation. The data acquisition system and the Man Machine Interface are implemented by ABB in co-operation with Ansaldo. The flexible and powerful software structure of 1090 Work-stations (APMS - Advanced Plant Monitoring System, or Tenore NT) has been successfully used to interface the

  3. Event detection and exception handling strategies in the ASDEX Upgrade discharge control system

    International Nuclear Information System (INIS)

    Treutterer, W.; Neu, G.; Rapson, C.; Raupp, G.; Zasche, D.; Zehetbauer, T.

    2013-01-01

    Highlights: •Event detection and exception handling is integrated in control system architecture. •Pulse control with local exception handling and pulse supervision with central exception handling are strictly separated. •Local exception handling limits the effect of an exception to a minimal part of the controlled system. •Central Exception Handling solves problems requiring coordinated action of multiple control components. -- Abstract: Thermonuclear plasmas are governed by nonlinear characteristics: plasma operation can be classified into scenarios with pronounced features like L and H-mode, ELMs or MHD activity. Transitions between them may be treated as events. Similarly, technical systems are also subject to events such as failure of measurement sensors, actuator saturation or violation of machine and plant operation limits. Such situations often are handled with a mixture of pulse abortion and iteratively improved pulse schedule reference programming. In case of protection-relevant events, however, the complexity of even a medium-sized device as ASDEX Upgrade requires a sophisticated and coordinated shutdown procedure rather than a simple stop of the pulse. The detection of events and their intelligent handling by the control system has been shown to be valuable also in terms of saving experiment time and cost. This paper outlines how ASDEX Upgrade's discharge control system (DCS) detects events and handles exceptions in two stages: locally and centrally. The goal of local exception handling is to limit the effect of an unexpected or asynchronous event to a minimal part of the controlled system. Thus, local exception handling facilitates robustness to failures but keeps the decision structures lean. A central state machine deals with exceptions requiring coordinated action of multiple control components. DCS implements the state machine by means of pulse schedule segments containing pre-programmed waveforms to define discharge goal and control

  4. Event detection and exception handling strategies in the ASDEX Upgrade discharge control system

    Energy Technology Data Exchange (ETDEWEB)

    Treutterer, W., E-mail: Wolfgang.Treutterer@ipp.mpg.de; Neu, G.; Rapson, C.; Raupp, G.; Zasche, D.; Zehetbauer, T.

    2013-10-15

    Highlights: •Event detection and exception handling is integrated in control system architecture. •Pulse control with local exception handling and pulse supervision with central exception handling are strictly separated. •Local exception handling limits the effect of an exception to a minimal part of the controlled system. •Central Exception Handling solves problems requiring coordinated action of multiple control components. -- Abstract: Thermonuclear plasmas are governed by nonlinear characteristics: plasma operation can be classified into scenarios with pronounced features like L and H-mode, ELMs or MHD activity. Transitions between them may be treated as events. Similarly, technical systems are also subject to events such as failure of measurement sensors, actuator saturation or violation of machine and plant operation limits. Such situations often are handled with a mixture of pulse abortion and iteratively improved pulse schedule reference programming. In case of protection-relevant events, however, the complexity of even a medium-sized device as ASDEX Upgrade requires a sophisticated and coordinated shutdown procedure rather than a simple stop of the pulse. The detection of events and their intelligent handling by the control system has been shown to be valuable also in terms of saving experiment time and cost. This paper outlines how ASDEX Upgrade's discharge control system (DCS) detects events and handles exceptions in two stages: locally and centrally. The goal of local exception handling is to limit the effect of an unexpected or asynchronous event to a minimal part of the controlled system. Thus, local exception handling facilitates robustness to failures but keeps the decision structures lean. A central state machine deals with exceptions requiring coordinated action of multiple control components. DCS implements the state machine by means of pulse schedule segments containing pre-programmed waveforms to define discharge goal and control

  5. Measurement and control system for the ITER remote handling mock-up test

    International Nuclear Information System (INIS)

    Oka, K.; Kakudate, S.; Takiguchi, Y.; Ako, K.; Taguchi, K.; Tada, E.; Ozaki, F.; Shibanuma, K.

    1998-01-01

    The mock-up test platforms composed of full-scale remote handling (RH) equipment were developed for demonstrating remote replacement of the ITER blanket and divertor. In parallel, the measurement and control system for operating these RH equipment were constructed on the basis of open architecture with object oriented feature, aiming at realization of fully-remoted automatic operation required for ITER. This paper describes the design concept of the measurement and control system for the remote handling equipment of ITER, and outlines the measured performances of the fabricated measurement system for the remote handling mock-up tests, which includes Data Acquisition System (DAS), Visual Monitoring System (VMS) and Virtual Reality System (VRS). (authors)

  6. A smartphone controlled handheld microfluidic liquid handling system.

    Science.gov (United States)

    Li, Baichen; Li, Lin; Guan, Allan; Dong, Quan; Ruan, Kangcheng; Hu, Ronggui; Li, Zhenyu

    2014-10-21

    Microfluidics and lab-on-a-chip technologies have made it possible to manipulate small volume liquids with unprecedented resolution, automation and integration. However, most current microfluidic systems still rely on bulky off-chip infrastructures such as compressed pressure sources, syringe pumps and computers to achieve complex liquid manipulation functions. Here, we present a handheld automated microfluidic liquid handling system controlled by a smartphone, which is enabled by combining elastomeric on-chip valves and a compact pneumatic system. As a demonstration, we show that the system can automatically perform all the liquid handling steps of a bead-based HIV1 p24 sandwich immunoassay on a multi-layer PDMS chip without any human intervention. The footprint of the system is 6 × 10.5 × 16.5 cm, and the total weight is 829 g including battery. Powered by a 12.8 V 1500 mAh Li battery, the system consumed 2.2 W on average during the immunoassay and lasted for 8.7 h. This handheld microfluidic liquid handling platform is generally applicable to many biochemical and cell-based assays requiring complex liquid manipulation and sample preparation steps such as FISH, PCR, flow cytometry and nucleic acid sequencing. In particular, the integration of this technology with read-out biosensors may help enable the realization of the long-sought Tricorder-like handheld in vitro diagnostic (IVD) systems.

  7. Planning and control of automated material handling systems: The merge module

    NARCIS (Netherlands)

    Haneyah, S.W.A.; Hurink, Johann L.; Schutten, Johannes M.J.; Zijm, Willem H.M.; Schuur, Peter; Hu, Bo; Morasch, Karl; Pickl, Stefan; Siegle, Markus

    2011-01-01

    We address the field of internal logistics, embodied in Automated Material Handling Systems (AMHSs), which are complex installations employed in sectors such as Baggage Handling, Physical Distribution, and Parcel & Postal. We work on designing an integral planning and real-time control architecture,

  8. Progress in standardization for ITER Remote Handling control system

    International Nuclear Information System (INIS)

    Hamilton, David Thomas; Tesini, Alessandro; Ranz, Roberto; Kozaka, Hiroshi

    2014-01-01

    Graphical abstract: - Highlights: • Standard parts specified for ITER Remote Handling (RH) control system. • Standard approach for VR modeling of structural deformations in real-time. • RH Core System produced as standard platform for RH controller applications. • Synthetic Viewing investigated and demonstrated. • Structured language defined for RH operation procedures and motion sequences. - Abstract: An integrated control system architecture has been defined for the ITER Remote Handling (RH) equipment systems, and work has been continuing to develop and validate standards for this architecture. Evaluations of standard parts and a standard control room work-cell have contributed to an update of the RH Control System Design Handbook, while R and D activities have been carried out to validate concepts for standard solutions to ITER RH problems: the use of a standard master arm with different slave arms, the achievement of high accuracy tracking of RH operations within virtual reality, and condition monitoring of RH equipment systems. The standardization efforts have been consolidated through the development of a freely distributable software platform to support the adoption of the ITER RH standards. The RH Core System installs on top of the CODAC Core System and provides the basic platform for the development of ITER RH equipment controller applications. The standardization work has continued in the areas of RH viewing, network communication protocols, and a structured language for programming ITER RH operations. Prototyping has been done on high-level control system applications, and R and D has been carried out in the area of synthetic viewing for ITER RH. These developments will be reflected in a new version of the RH Core System to be produced during 2013

  9. Progress in standardization for ITER Remote Handling control system

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, David Thomas, E-mail: david.hamilton@iter.org [ITER Organization, Route de Vinon, 13115 St. Paul-lez-Durance (France); Tesini, Alessandro [ITER Organization, Route de Vinon, 13115 St. Paul-lez-Durance (France); Ranz, Roberto [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Kozaka, Hiroshi [Japan Atomic Energy Agency, Fusion Research and Development Directorate, Naka, Ibaraki-ken 311-0193 (Japan)

    2014-10-15

    Graphical abstract: - Highlights: • Standard parts specified for ITER Remote Handling (RH) control system. • Standard approach for VR modeling of structural deformations in real-time. • RH Core System produced as standard platform for RH controller applications. • Synthetic Viewing investigated and demonstrated. • Structured language defined for RH operation procedures and motion sequences. - Abstract: An integrated control system architecture has been defined for the ITER Remote Handling (RH) equipment systems, and work has been continuing to develop and validate standards for this architecture. Evaluations of standard parts and a standard control room work-cell have contributed to an update of the RH Control System Design Handbook, while R and D activities have been carried out to validate concepts for standard solutions to ITER RH problems: the use of a standard master arm with different slave arms, the achievement of high accuracy tracking of RH operations within virtual reality, and condition monitoring of RH equipment systems. The standardization efforts have been consolidated through the development of a freely distributable software platform to support the adoption of the ITER RH standards. The RH Core System installs on top of the CODAC Core System and provides the basic platform for the development of ITER RH equipment controller applications. The standardization work has continued in the areas of RH viewing, network communication protocols, and a structured language for programming ITER RH operations. Prototyping has been done on high-level control system applications, and R and D has been carried out in the area of synthetic viewing for ITER RH. These developments will be reflected in a new version of the RH Core System to be produced during 2013.

  10. Sophisticated fuel handling system evolved

    International Nuclear Information System (INIS)

    Ross, D.A.

    1988-01-01

    The control systems at Sellafield fuel handling plant are described. The requirements called for built-in diagnostic features as well as the ability to handle a large sequencing application. Speed was also important; responses better than 50ms were required. The control systems are used to automate operations within each of the three main process caves - two Magnox fuel decanners and an advanced gas-cooled reactor fuel dismantler. The fuel route within the fuel handling plant is illustrated and described. ASPIC (Automated Sequence Package for Industrial Control) which was developed as a controller for the plant processes is described. (U.K.)

  11. Model-based design of supervisory controllers for baggage handling systems

    NARCIS (Netherlands)

    Swartjes, L.; van Beek, D.A.; Fokkink, W.J.; van Eekelen, J.A.W.M.

    2017-01-01

    The complexity of airport baggage handling systems in combination with the required high level of robustness makes designing supervisory controllers for these systems a challenging task. We show how a state of the art, formal, model-based design framework has been successfully used for model-based

  12. Integrated digital control and man-machine interface for complex remote handling systems

    International Nuclear Information System (INIS)

    Rowe, J.C.; Spille, R.F.; Zimmermann, S.D.

    1986-12-01

    The Advanced Integrated Maintenance System (AIMS) is part of a continuing effort within the Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory to develop and extend the capabilities of remote manipulation and maintenance technology. The AIMS is a totally integrated approach to remote handling in hazardous environments. State-of-the-art computer systems connected through a high-speed communication network provide a real-time distributed control system that supports the flexibility and expandability needed for large integrated maintenance applications. A Man-Machine Interface provides high-level human interaction through a powerful color graphics menu-controlled operator console. An auxiliary control system handles the real-time processing needs for a variety of support hardware. A pair of dedicated fiber-optic-linked master/slave computer system control the Advanced Servomanipulator master/slave arms using powerful distributed digital processing methods. The FORTH language was used as a real-time operating and development environment for the entire system, and all of these components are integrated into a control room concept that represents the latest advancements in the development of remote maintenance facilities for hazardous environments

  13. Optimized hardware design for the divertor remote handling control system

    Energy Technology Data Exchange (ETDEWEB)

    Saarinen, Hannu [Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland)], E-mail: hannu.saarinen@tut.fi; Tiitinen, Juha; Aha, Liisa; Muhammad, Ali; Mattila, Jouni; Siuko, Mikko; Vilenius, Matti [Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland); Jaervenpaeae, Jorma [VTT Systems Engineering, Tekniikankatu 1, 33720 Tampere (Finland); Irving, Mike; Damiani, Carlo; Semeraro, Luigi [Fusion for Energy, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain)

    2009-06-15

    A key ITER maintenance activity is the exchange of the divertor cassettes. One of the major focuses of the EU Remote Handling (RH) programme has been the study and development of the remote handling equipment necessary for divertor exchange. The current major step in this programme involves the construction of a full scale physical test facility, namely DTP2 (Divertor Test Platform 2), in which to demonstrate and refine the RH equipment designs for ITER using prototypes. The major objective of the DTP2 project is the proof of concept studies of various RH devices, but is also important to define principles for standardizing control hardware and methods around the ITER maintenance equipment. This paper focuses on describing the control system hardware design optimization that is taking place at DTP2. Here there will be two RH movers, namely the Cassette Multifuctional Mover (CMM), Cassette Toroidal Mover (CTM) and assisting water hydraulic force feedback manipulators (WHMAN) located aboard each Mover. The idea here is to use common Real Time Operating Systems (RTOS), measurement and control IO-cards etc. for all maintenance devices and to standardize sensors and control components as much as possible. In this paper, new optimized DTP2 control system hardware design and some initial experimentation with the new DTP2 RH control system platform are presented. The proposed new approach is able to fulfil the functional requirements for both Mover and Manipulator control systems. Since the new control system hardware design has reduced architecture there are a number of benefits compared to the old approach. The simplified hardware solution enables the use of a single software development environment and a single communication protocol. This will result in easier maintainability of the software and hardware, less dependence on trained personnel, easier training of operators and hence reduced the development costs of ITER RH.

  14. WASTE HANDLING BUILDING FIRE PROTECTION SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    J. D. Bigbee

    2000-06-21

    The Waste Handling Building Fire Protection System provides the capability to detect, control, and extinguish fires and/or mitigate explosions throughout the Waste Handling Building (WHB). Fire protection includes appropriate water-based and non-water-based suppression, as appropriate, and includes the distribution and delivery systems for the fire suppression agents. The Waste Handling Building Fire Protection System includes fire or explosion detection panel(s) controlling various detectors, system actuation, annunciators, equipment controls, and signal outputs. The system interfaces with the Waste Handling Building System for mounting of fire protection equipment and components, location of fire suppression equipment, suppression agent runoff, and locating fire rated barriers. The system interfaces with the Waste Handling Building System for adequate drainage and removal capabilities of liquid runoff resulting from fire protection discharges. The system interfaces with the Waste Handling Building Electrical Distribution System for power to operate, and with the Site Fire Protection System for fire protection water supply to automatic sprinklers, standpipes, and hose stations. The system interfaces with the Site Fire Protection System for fire signal transmission outside the WHB as needed to respond to a fire emergency, and with the Waste Handling Building Ventilation System to detect smoke and fire in specific areas, to protect building high-efficiency particulate air (HEPA) filters, and to control portions of the Waste Handling Building Ventilation System for smoke management and manual override capability. The system interfaces with the Monitored Geologic Repository (MGR) Operations Monitoring and Control System for annunciation, and condition status.

  15. WASTE HANDLING BUILDING FIRE PROTECTION SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    J. D. Bigbee

    2000-01-01

    The Waste Handling Building Fire Protection System provides the capability to detect, control, and extinguish fires and/or mitigate explosions throughout the Waste Handling Building (WHB). Fire protection includes appropriate water-based and non-water-based suppression, as appropriate, and includes the distribution and delivery systems for the fire suppression agents. The Waste Handling Building Fire Protection System includes fire or explosion detection panel(s) controlling various detectors, system actuation, annunciators, equipment controls, and signal outputs. The system interfaces with the Waste Handling Building System for mounting of fire protection equipment and components, location of fire suppression equipment, suppression agent runoff, and locating fire rated barriers. The system interfaces with the Waste Handling Building System for adequate drainage and removal capabilities of liquid runoff resulting from fire protection discharges. The system interfaces with the Waste Handling Building Electrical Distribution System for power to operate, and with the Site Fire Protection System for fire protection water supply to automatic sprinklers, standpipes, and hose stations. The system interfaces with the Site Fire Protection System for fire signal transmission outside the WHB as needed to respond to a fire emergency, and with the Waste Handling Building Ventilation System to detect smoke and fire in specific areas, to protect building high-efficiency particulate air (HEPA) filters, and to control portions of the Waste Handling Building Ventilation System for smoke management and manual override capability. The system interfaces with the Monitored Geologic Repository (MGR) Operations Monitoring and Control System for annunciation, and condition status

  16. Robotic control architecture development for automated nuclear material handling systems

    International Nuclear Information System (INIS)

    Merrill, R.D.; Hurd, R.; Couture, S.; Wilhelmsen, K.

    1995-02-01

    Lawrence Livermore National Laboratory (LLNL) is engaged in developing automated systems for handling materials for mixed waste treatment, nuclear pyrochemical processing, and weapon components disassembly. In support of these application areas there is an extensive robotic development program. This paper will describe the portion of this effort at LLNL devoted to control system architecture development, and review two applications currently being implemented which incorporate these technologies

  17. Man/machine interface for a nuclear cask remote handling control station: system design requirements

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.; Draper, J.V.

    1984-01-01

    Design requirements are presented for a control station of a proposed semi-automated facility for remote handling of nuclear waste casks. Functional and operational man/machine interface: controls, displays, software format, station architecture, and work environment. In addition, some input is given to the design of remote sensing systems in the cask handling areas. 18 references, 9 figures, 12 tables

  18. Generic Planning and Control of Automated Material Handling Systems: Practical Requirements Versus Existing Theroy.

    NARCIS (Netherlands)

    Haneyah, S.W.A.; Zijm, Willem H.M.; Schutten, Johannes M.J.; Schuur, Peter

    2011-01-01

    This paper discusses the problem of generic planning and control of Automated Material Handling Systems (AMHSs). The paper illustrates the relevance of this research direction, and then addresses three different market sectors where AMHSs are used. These market sectors are: baggage handling,

  19. Generic planning and control of automated material handling systems : practical requirements versus existing theory

    NARCIS (Netherlands)

    Haneyah, S.W.A.; Schutten, Johannes M.J.; Schuur, Peter; Zijm, Willem H.M.

    2013-01-01

    This paper discusses the problem to design a generic planning and control architecture for utomated material handling systems (AMHSs). We illustrate the relevance of this research direction, and then address three different market sectors where AMHSs are used, i.e., baggage handling, distribution,

  20. 21 CFR 58.107 - Test and control article handling.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Test and control article handling. 58.107 Section... GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Test and Control Articles § 58.107 Test and control article handling. Procedures shall be established for a system for the handling of the test and...

  1. Experimental robot gripper control for handling of soft objects

    Science.gov (United States)

    Friedrich, Werner E.; Ziegler, T. H.; Lim, P.

    1996-10-01

    The challenging task of automated handling of variable objects necessitates a combination of innovative engineering and advanced information technology. This paper describes the application of a recently developed control strategy applied to overcome some limitations of robot handling, particularly when dealing with variable objects. The paper focuses on a novel approach to accommodate the need for sensing and actuation in controlling the pickup procedure. An experimental robot-based system for the handling of soft parts, ranging from artificial components to natural objects such as fruit and meat pieces was developed. The configuration comprises a modular gripper subsystem, and an industrial robot as part of a distributed control system. The gripper subsystem features manually configurable fingers with integrated sensing capabilities. The control architecture is based on a concept of decentralized control differentiating between positioning and gripping procedures. In this way, the robot and gripper systems are treated as individual handling operations. THis concept allows very short set-up times for future changes involving one or more sub-systems.

  2. Design method of control system for HTGR fuel handling process with control Petri net

    International Nuclear Information System (INIS)

    Han Zandong; Luo Sheng; Liu Jiguo

    2008-01-01

    As a complex mechanical system,the fuel handling system (FHS) of pebble-bed high temperature gas cooled reactor (HTGR) is with the features of complicated structure, numerous control devices and strict working scheduling. It is very important to precisely describe the function of FHS and effectively design its control system. A design method of control system based on control Petri net (CPN) is introduced in this paper. By associating outputs and operations with places, associating inputs and conditions with transitions, and introducing macro-places and macro-actions, the CPN realizes hierarchy design of complex control system. Based on the analysis of basic functions and working flow of FHS, its control system is described and designed by CPN. According to the firing regulation of transition,the designed CPN can be easily converted into LAD program of PLC, which can be implemented on the FHS simulating control test-bed. Application illuminates that proposed method has the advantages of clear design structure, exact description power and effective design ability of control program, which can meet the requirements of FHS control sys-tem design. (authors)

  3. Remotely controlled inspection and handling systems for decommissioning tasks in nuclear facilities

    International Nuclear Information System (INIS)

    Schreck, G.; Bach, W.; Haferkamp, H.

    1993-01-01

    The Institut fur Werkstoffkunde at the University of Hanover has recently developed three remotely controlled systems for different underwater inspection and dismantling tasks. ODIN I is a tool guiding device, particularly being designed for the dismantling of the steam dryer housing of the KRB A power plant at Gundremmingen, Germany. After being approved by the licencing organization TUEV Bayern, hot operation started in November 1992. The seven axes remotely controlled handling system ZEUS, consisting of a three translatory axes guiding machine and a tool handling device with four rotatory axes, has been developed for the demonstration of underwater plasma arc cutting of spherical metallic components with great wall thicknesses. A specially designed twin sensor system and a modular torch, exchanged by means of a remote controlled tool changing device, will be used for different complex cutting tasks. FAUST, an autonomous, freediving underwater vehicle, was designed for complex inspection, maintenance and dismantling tasks. It is equipped with two video cameras, an ultrasonic and a radiologic sensor and a small plasma torch. A gripper and a subsidiary vehicle for inspection may be attached. (author)

  4. Improving Vehicle Ride and Handling Using LQG CNF Fusion Control Strategy for an Active Antiroll Bar System

    Directory of Open Access Journals (Sweden)

    N. Zulkarnain

    2014-01-01

    Full Text Available This paper analyses a comparison of performance for an active antiroll bar (ARB system using two types of control strategy. First of all, the LQG control strategy is investigated and then a novel LQG CNF fusion control method is developed to improve the performances on vehicle ride and handling for an active antiroll bar system. However, the ARB system has to balance the trade-off between ride and handling performance, where the CNF consists of a linear feedback law and a nonlinear feedback law. Typically, the linear feedback is designed to yield a quick response at the initial stage, while the nonlinear feedback law is used to smooth out overshoots in the system output when it approaches the target reference. The half car model is combined with a linear single track model with roll dynamics which are used for the analysis and simulation of ride and handling. The performances of the control strategies are compared and the simulation results show the LQG CNF fusion improves the performances in vehicle ride and handling.

  5. Graphical models for simulation and control of robotic systems for waste handling

    International Nuclear Information System (INIS)

    Drotning, W.D.; Bennett, P.C.

    1992-01-01

    This paper discusses detailed geometric models which have been used within a graphical simulation environment to study transportation cask facility design and to perform design and analyses of robotic systems for handling of nuclear waste. The models form the basis for a robot control environment which provides safety, flexibility, and reliability for operations which span the spectrum from autonomous control to tasks requiring direct human intervention

  6. Fuel handling machine and auxiliary systems for a fuel handling cell

    International Nuclear Information System (INIS)

    Suikki, M.

    2013-10-01

    This working report is an update for as well as a supplement to an earlier fuel handling machine design (Kukkola and Roennqvist 2006). A focus in the earlier design proposal was primarily on the selection of a mechanical structure and operating principle for the fuel handling machine. This report introduces not only a fuel handling machine design but also auxiliary fuel handling cell equipment and its operation. An objective of the design work was to verify the operating principles of and space allocations for fuel handling cell equipment. The fuel handling machine is a remote controlled apparatus capable of handling intensely radiating fuel assemblies in the fuel handling cell of an encapsulation plant. The fuel handling cell is air tight space radiation-shielded with massive concrete walls. The fuel handling machine is based on a bridge crane capable of traveling in the handling cell along wall tracks. The bridge crane has its carriage provided with a carousel type turntable having mounted thereon both fixed and telescopic masts. The fixed mast has a gripper movable on linear guides for the transfer of fuel assemblies. The telescopic mast has a manipulator arm capable of maneuvering equipment present in the fuel handling cell, as well as conducting necessary maintenance and cleaning operations or rectifying possible fault conditions. The auxiliary fuel handling cell systems consist of several subsystems. The subsystems include a service manipulator, a tool carrier for manipulators, a material hatch, assisting winches, a vacuum cleaner, as well as a hose reel. With the exception of the vacuum cleaner, the devices included in the fuel handling cell's auxiliary system are only used when the actual encapsulation process is not ongoing. The malfunctions of mechanisms or actuators responsible for the motion actions of a fuel handling machine preclude in a worst case scenario the bringing of the fuel handling cell and related systems to a condition appropriate for

  7. Fuel handling machine and auxiliary systems for a fuel handling cell

    Energy Technology Data Exchange (ETDEWEB)

    Suikki, M. [Optimik Oy, Turku (Finland)

    2013-10-15

    This working report is an update for as well as a supplement to an earlier fuel handling machine design (Kukkola and Roennqvist 2006). A focus in the earlier design proposal was primarily on the selection of a mechanical structure and operating principle for the fuel handling machine. This report introduces not only a fuel handling machine design but also auxiliary fuel handling cell equipment and its operation. An objective of the design work was to verify the operating principles of and space allocations for fuel handling cell equipment. The fuel handling machine is a remote controlled apparatus capable of handling intensely radiating fuel assemblies in the fuel handling cell of an encapsulation plant. The fuel handling cell is air tight space radiation-shielded with massive concrete walls. The fuel handling machine is based on a bridge crane capable of traveling in the handling cell along wall tracks. The bridge crane has its carriage provided with a carousel type turntable having mounted thereon both fixed and telescopic masts. The fixed mast has a gripper movable on linear guides for the transfer of fuel assemblies. The telescopic mast has a manipulator arm capable of maneuvering equipment present in the fuel handling cell, as well as conducting necessary maintenance and cleaning operations or rectifying possible fault conditions. The auxiliary fuel handling cell systems consist of several subsystems. The subsystems include a service manipulator, a tool carrier for manipulators, a material hatch, assisting winches, a vacuum cleaner, as well as a hose reel. With the exception of the vacuum cleaner, the devices included in the fuel handling cell's auxiliary system are only used when the actual encapsulation process is not ongoing. The malfunctions of mechanisms or actuators responsible for the motion actions of a fuel handling machine preclude in a worst case scenario the bringing of the fuel handling cell and related systems to a condition appropriate for

  8. Adaptive control of manipulators handling hazardous waste

    International Nuclear Information System (INIS)

    Colbaugh, R.; Glass, K.

    1994-01-01

    This article focuses on developing a robot control system capable of meeting hazardous waste handling application requirements, and presents as a solution an adaptive strategy for controlling the mechanical impedance of kinematically redundant manipulators. The proposed controller is capable of accurate end-effector impedance control and effective redundancy utilization, does not require knowledge of the complex robot dynamic model or parameter values for the robot or the environment, and is implemented without calculation of the robot inverse transformation. Computer simulation results are given for a four degree of freedom redundant robot under adaptive impedance control. These results indicate that the proposed controller is capable of successfully performing important tasks in robotic waste handling applications. (author) 3 figs., 39 refs

  9. Comparison of control systems applied to the handling of radioactive reactor components

    International Nuclear Information System (INIS)

    Robinson, C.; Harris, E.G.; Dyer, P.C.; Williams, J.G.B.

    1985-01-01

    The first generation of nuclear power stations have individual reactors each incorporating complete facilities for servicing components and refuelling. In the later designs, each power station has two reactors which are connected by a central block. This central block contains one set of facilities to service both reactors, but to improve the station capability, some of these are to be replicated. The central block incorporates a hoist well which was used during construction for the accessing of complete components. On completion of this work, the physical size of the hoist well is such as to permit the incorporation of additional facilities if these are shown to be operationally and economically desirable. Since a number of years of power operation has elapsed, the advantages of back-fitting to existing fuel-handling facilities has been illustrated. Since the mechanical arrangements and operating procedures are substantially similar for both the original and new handling facilities, the paper will illustrate the control systems provided for each. The configuration of the system is arranged to have two channels of control which complies with the current standard requirements in the United Kingdom. These requirements are more stringent than when the existing facility was designed and constructed, as described in the relevant sections of the paper. The new system has been designed and is being manufactured to comply with the Central Electricity Generating Board standard for nuclear fuel route interlock and control systems. (author)

  10. PREPD O and VE remote handling system

    International Nuclear Information System (INIS)

    Theil, T.N.

    1985-01-01

    The Process Experimental Pilot Plant (PREPP) at the Idaho National Engineering Laboratory is designed for volume reduction and packaging of transuranic (TRU) waste. The PREPP opening and verification enclosure (O and VE) remote handling system, within that facility, is designed to provide examination of the contents of various TRU waste storage containers. This remote handling system will provide the means of performing a hazardous operation that is currently performed manually. The TeleRobot to be used in this system is a concept that will incorporate and develop man in the loop operation (manual mode), standardized automatic sequencing of end effector tools, increased payload and reach over currently available computer-controlled robots, and remote handling of a hazardous waste operation. The system is designed within limited space constraints and an operation that was originally planned, and is currently being manually performed at other plants. The PREPP O and VE remote handling system design incorporates advancing technology to improve the working environment in the nuclear field

  11. Engineering Support for Handling Controller Conflicts in Energy Storage Systems Applications

    Directory of Open Access Journals (Sweden)

    Claudia Zanabria

    2017-10-01

    Full Text Available Energy storage systems will play a major role in the decarbonization of future sustainable electric power systems, allowing a high penetration of distributed renewable energy sources and contributing to the distribution network stability and reliability. To accomplish this, a storage system is required to provide multiple services such as self-consumption, grid support, peak-shaving, etc. The simultaneous activation of controllers operation may lead to conflicts, as a consequence the execution of committed services is not guaranteed. This paper presents and discusses a solution to the exposed issue by developing an engineering support approach to semi-automatically detect and handle conflicts for multi-usage storage systems applications. To accomplish that an ontology is developed and exploited by model-driven engineering mechanisms. The proposed approach is evaluated by implementing a use case example, where detection of conflicts is automatically done at an early design stage. Besides this, exploitable source code for conflicts resolution is generated and used during the design and prototype stages of controllers development. Thus, the proposed engineering support enhances the design and development of storage system controllers, especially for multi-usage applications.

  12. MHSS: a material handling system simulator

    Energy Technology Data Exchange (ETDEWEB)

    Pomernacki, L.; Hollstien, R.B.

    1976-04-07

    A Material Handling System Simulator (MHSS) program is described that provides specialized functional blocks for modeling and simulation of nuclear material handling systems. Models of nuclear fuel fabrication plants may be built using functional blocks that simulate material receiving, storage, transport, inventory, processing, and shipping operations as well as the control and reporting tasks of operators or on-line computers. Blocks are also provided that allow the user to observe and gather statistical information on the dynamic behavior of simulated plants over single or replicated runs. Although it is currently being developed for the nuclear materials handling application, MHSS can be adapted to other industries in which material accountability is important. In this paper, emphasis is on the simulation methodology of the MHSS program with application to the nuclear material safeguards problem. (auth)

  13. Development of a control system for a heavy object handling manipulator. Application to a remote maintenance system for ITER blanket module

    International Nuclear Information System (INIS)

    Yoshimi, Takashi; Tsuji, Kouichi; Miyagawa, Shinichi; Kubo, Tomomi; Kakudate, Satoshi; Tada, Eisuke

    2001-01-01

    This paper describes a control system for the heavy object handling manipulator. It has been developed for the blanket module remote maintenance system of ITER (International Thermonuclear Fusion Experimental Reactor). A rail-mounted vehicle-type manipulator is proposed for the precise handling of a blanket module which is about 4 tons in weight. Basically, this manipulator is controlled by teaching-playback technique. When grasping or releasing the module, the manipulator sags and the position of the end-effector changes about 50 [mm]. Applying only the usual teaching-playback control makes the smooth operation of setting/removing modules to/from the vacuum vessel wall difficult due to this position change. To solve this proper problem of heavy object handling manipulator, we have developed a system which uses motion patterns generated from two kinds of teaching points. These motion patterns for setting/removing heavy objects are generated by combining teaching points for positioning the manipulator with and without grasping the object. When these motion patterns are applied, the manipulator can transfer the object's weight smoothly at the setting/removing point. This developed system has been applied to the real-scale mock-up of the vehicle manipulator and through the actual module setting/removing experiments, we have verified its effectiveness and realized smooth maintenance operation. (author)

  14. Data handling systems and methods of wiring

    International Nuclear Information System (INIS)

    Grant, J.

    1981-01-01

    An improved data handling system, for monitoring and control of nuclear reactor operations, is described in which time delays associated with scanning are reduced and noise and fault signals in the system are resolved. (U.K.)

  15. Hazard Control Extensions in a COTS Based Data Handling System

    Science.gov (United States)

    Vogel, Torsten; Rakers, Sven; Gronowski, Matthias; Schneegans, Joachim

    2011-08-01

    EML is an electromagnetic levitator for containerless processing of conductive samples on the International Space Station. This material sciences experiment is running in the European Drawer Rack (EDR) facility. The objective of this experiment is to gain insight into the parameters of liquid metal samples and their crystallisation processes without the influence of container walls. To this end the samples are electromagnetically positioned in a coil system and then heated up beyond their melting point in an ultraclean environment.The EML programme is currently under development by Astrium Space Transportation in Friedrichshafen and Bremen; jointly funded by ESA and DLR (on behalf of BMWi, contract 50WP0808). EML consists of four main modules listed in Table 1. The paper focuses mainly on the architecture and design of the ECM module and its contribution to a safe operation of the experiment. The ECM is a computer system that integrates the power supply to the EML experiment, control functions and video handling and compression features. Experiment control is performed by either telecommand or the execution of predefined experiment scripts.

  16. MFTF exception handling system

    International Nuclear Information System (INIS)

    Nowell, D.M.; Bridgeman, G.D.

    1979-01-01

    In the design of large experimental control systems, a major concern is ensuring that operators are quickly alerted to emergency or other exceptional conditions and that they are provided with sufficient information to respond adequately. This paper describes how the MFTF exception handling system satisfies these requirements. Conceptually exceptions are divided into one of two classes. Those which affect command status by producing an abort or suspend condition and those which fall into a softer notification category of report only or operator acknowledgement requirement. Additionally, an operator may choose to accept an exception condition as operational, or turn off monitoring for sensors determined to be malfunctioning. Control panels and displays used in operator response to exceptions are described

  17. Protecting worker health and safety using remote handling systems

    International Nuclear Information System (INIS)

    Dennison, D.K.; Merrill, R.D.; Reed, R.K.

    1995-03-01

    Lawrence Livermore National Laboratory (LLNL) is currently developing and installing two large-scale, remotely controlled systems for use in improving worker health and safety by minimizing exposure to hazardous and radioactive materials. The first system is a full-scale liquid feed system for use in delivering chemical reagents to LLNL's existing aqueous low-level radioactive and mixed waste treatment facility (Tank Farm). The Tank Farm facility is used to remove radioactive and toxic materials in aqueous wastes prior to discharge to the City of Livermore Water Reclamation Plant (LWRP), in accordance with established discharge limits. Installation of this new reagent feed system improves operational safety and process efficiency by eliminating the need to manually handle reagents used in the treatment processes. This was done by installing a system that can inject precisely metered amounts of various reagents into the treatment tanks and can be controlled either remotely or locally via a programmable logic controller (PLC). The second system uses a robotic manipulator to remotely handle, characterize, process, sort, and repackage hazardous wastes containing tritium. This system uses an IBM-developed gantry robot mounted within a special glove box enclosure designed to isolate tritiated wastes from system operators and minimize the potential for release of tritium to the atmosphere. Tritiated waste handling is performed remotely, using the robot in a teleoperational mode for one-of-a-kind functions and in an autonomous mode for repetitive operations. The system is compatible with an existing portable gas cleanup unit designed to capture any gas-phase tritium inadvertently released into the glove box during waste handling

  18. Advanced operator interface design for CANDU-3 fuel handling system

    Energy Technology Data Exchange (ETDEWEB)

    Arapakota, D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada)

    1996-12-31

    The Operator Interface for the CANDU 3 Fuel Handling (F/H) System incorporates several improvements over the existing designs. A functionally independent sit-down CRT (cathode-ray tube) based Control Console is provided for the Fuel Handling Operator in the Main Control Room. The Display System makes use of current technology and provides a user friendly operator interface. Regular and emergency control operations can be carried out from this control console. A stand-up control panel is provided as a back-up with limited functionality adequate to put the F/H System in a safe state in case of an unlikely non-availability of the Plant Display System or the F/H Control System`. The system design philosophy, hardware configuration and the advanced display system features are described in this paper The F/H Operator Interface System developed for CANDU 3 can be adapted to CANDU 9 as well as to the existing stations. (author).

  19. Advanced operator interface design for CANDU-3 fuel handling system

    International Nuclear Information System (INIS)

    Arapakota, D.

    1995-01-01

    The Operator Interface for the CANDU 3 Fuel Handling (F/H) System incorporates several improvements over the existing designs. A functionally independent sit-down CRT (cathode-ray tube) based Control Console is provided for the Fuel Handling Operator in the Main Control Room. The Display System makes use of current technology and provides a user friendly operator interface. Regular and emergency control operations can be carried out from this control console. A stand-up control panel is provided as a back-up with limited functionality adequate to put the F/H System in a safe state in case of an unlikely non-availability of the Plant Display System or the F/H Control System'. The system design philosophy, hardware configuration and the advanced display system features are described in this paper The F/H Operator Interface System developed for CANDU 3 can be adapted to CANDU 9 as well as to the existing stations. (author)

  20. Spoken commands control robot that handles radioactive materials

    International Nuclear Information System (INIS)

    Phelan, P.F.; Keddy, C.; Beugelsdojk, T.J.

    1989-01-01

    Several robotic systems have been developed by Los Alamos National Laboratory to handle radioactive material. Because of safety considerations, the robotic system must be under direct human supervision and interactive control continuously. In this paper, we describe the implementation of a voice-recognition system that permits this control, yet allows the robot to perform complex preprogrammed manipulations without the operator's intervention. To provide better interactive control, we connected to the robot's control computer, a speech synthesis unit, which provides audible feedback to the operator. Thus upon completion of a task or if an emergency arises, an appropriate spoken message can be reported by the control computer. The training programming and operation of this commercially available system are discussed, as are the practical problems encountered during operations

  1. Progress in control equipment for fuel-handling machinery

    International Nuclear Information System (INIS)

    Nutting, B.A.

    1986-01-01

    The paper outlines the development of the equipment used to control the fuel-handling machinery associated with nuclear reactors, from the early electromechanical equipment, through solid-state switching logic to programmable controllers and microprocessors. The control techniques have developed along with the technology, and modern systems offer versatility, reliability and ease of design, operation and maintenance. Future trends and developments are discussed together with possible limiting factors. (author)

  2. The use of physical model simulation to emulate an AGV material handling system

    International Nuclear Information System (INIS)

    Hurley, R.G.; Coffman, P.E.; Dixon, J.R.; Walacavage, J.G.

    1987-01-01

    This paper describes an application of physical modeling to the simulation of a prototype AGV (Automatic Guided Vehicle) material handling system. Physical modeling is the study of complex automated manufacturing and material handling systems through the use of small scale components controlled by mini and/or microcomputers. By modeling the mechanical operations of the proposed AGV material handling system, it was determined that control algorithms and AGV dispatch rules could be developed and evaluated. This paper presents a brief explanation of physical modeling as a simulation tool and addresses in detail the development of the control algorithm, dispatching rules, and a prototype physical model of a flexible machining system

  3. Evolution of a test article handling system for the SP-100 ground engineering system test

    International Nuclear Information System (INIS)

    Shen, E.J.; Schweiger, L.J.; Miller, W.C.; Gluck, R.; Devies, S.M.

    1987-04-01

    A simulated space environment test of a flight prototypic SP-100 reactor, control system, and flight shield will be conducted at the Hanford Engineering Development Laboratory (HEDL). The flight prototypic components and the supporting primary heat removal system are collectively known as the Nuclear Assembly Test Article (TA). The unique configuration and materials of fabrication for the Test Article require a specialized handling facility to support installation, maintenance, and final disposal operations. Westinghouse Hanford Company, the Test Site Operator, working in conjunction with General Electric Company, the Test Article supplier, developed and evaluated several handling concepts resulting in the selection of a reference Test Article Handling System. The development of the reference concept for the handling system is presented

  4. Remote systems and automation in radioactive waste package handling

    International Nuclear Information System (INIS)

    Gneiting, B.C.; Hayward, M.L.

    1987-01-01

    A proof-of-principle test was conducted at the Hanford Engineering Development Laboratory (HEDL) to demonstrate the feasibility of performing cask receiving and unloading operations in a remote and partially automated manner. This development testing showed feasibility of performing critical cask receipt, preparation, and unloading operations from a single control station using remote controls and indirect viewing. Using robotics and remote automation in a cask handling system can result in lower personnel exposure levels and cask turnaround times while maintaining operational flexibility. An automated cask handling system presents a flexible state-of-the-art, cost effective alternative solution to hands-on methods that have been used in the past

  5. Interoperability of remote handling control system software modules at Divertor Test Platform 2 using middleware

    International Nuclear Information System (INIS)

    Tuominen, Janne; Rasi, Teemu; Mattila, Jouni; Siuko, Mikko; Esque, Salvador; Hamilton, David

    2013-01-01

    Highlights: ► The prototype DTP2 remote handling control system is a heterogeneous collection of subsystems, each realizing a functional area of responsibility. ► Middleware provides well-known, reusable solutions to problems, such as heterogeneity, interoperability, security and dependability. ► A middleware solution was selected and integrated with the DTP2 RH control system. The middleware was successfully used to integrate all relevant subsystems and functionality was demonstrated. -- Abstract: This paper focuses on the inter-subsystem communication channels in a prototype distributed remote handling control system at Divertor Test Platform 2 (DTP2). The subsystems are responsible for specific tasks and, over the years, their development has been carried out using various platforms and programming languages. The communication channels between subsystems have different priorities, e.g. very high messaging rate and deterministic timing or high reliability in terms of individual messages. Generally, a control system's communication infrastructure should provide interoperability, scalability, performance and maintainability. An attractive approach to accomplish this is to use a standardized and proven middleware implementation. The selection of a middleware can have a major cost impact in future integration efforts. In this paper we present development done at DTP2 using the Object Management Group's (OMG) standard specification for Data Distribution Service (DDS) for ensuring communications interoperability. DDS has gained a stable foothold especially in the military field. It lacks a centralized broker, thereby avoiding a single-point-of-failure. It also includes an extensive set of Quality of Service (QoS) policies. The standard defines a platform- and programming language independent model and an interoperability wire protocol that enables DDS vendor interoperability, allowing software developers to avoid vendor lock-in situations

  6. Development of a Remote Handling System in an Integrated Pyroprocessing Facility

    Directory of Open Access Journals (Sweden)

    Hyo Jik Lee

    2013-10-01

    Full Text Available Over the course of a decade-long research programme, the Korea Atomic Energy Research Institute (KAERI has developed several remote handling systems for use in pyroprocessing research facilities. These systems are now used successfully for the operation and maintenance of processing equipment. The most recent remote handling system is the bridge-transported dual arm servo-manipulator system (BDSM, which is used for remote operation at the world's largest pyroprocess integrated inactive demonstration facility (PRIDE. Accurate and reliable servo-control is the basic requirement for the BDSM to accomplish any given tasks successfully in a hotcell environment. To achieve this end, the hardware and software of a digital signal processor-based remote control system were fully custom-developed and implemented to control the BDSM. To reduce the residual vibration of the BDSM, several input profiles, including input shaping, were carefully chosen and evaluated. Furthermore, a time delay controller was employed to achieve good tracking performance and systematic gain tuning. The experimental results demonstrate that the applied control algorithms are more effective than conventional approaches. The BDSM successfully completed its performance tests at a mock-up and was installed at PRIDE for real-world operation. The remote handling system at KAERI is expected to advance the actualization of pyroprocessing.

  7. Evolution of the Darlington NGS fuel handling computer systems

    International Nuclear Information System (INIS)

    Leung, V.; Crouse, B.

    1996-01-01

    The ability to improve the capabilities and reliability of digital control systems in nuclear power stations to meet changing plant and personnel requirements is a formidable challenge. Many of these systems have high quality assurance standards that must be met to ensure adequate nuclear safety. Also many of these systems contain obsolete hardware along with software that is not easily transported to newer technology computer equipment. Combining modern technology upgrades into a system of obsolete hardware components is not an easy task. Lastly, as users become more accustomed to using modern technology computer systems in other areas of the station (e.g. information systems), their expectations of the capabilities of the plant systems increase. This paper will present three areas of the Darlington NGS fuel handling computer system that have been or are in the process of being upgraded to current technology components within the framework of an existing fuel handling control system. (author). 3 figs

  8. Evolution of the Darlington NGS fuel handling computer systems

    Energy Technology Data Exchange (ETDEWEB)

    Leung, V; Crouse, B [Ontario Hydro, Bowmanville (Canada). Darlington Nuclear Generating Station

    1997-12-31

    The ability to improve the capabilities and reliability of digital control systems in nuclear power stations to meet changing plant and personnel requirements is a formidable challenge. Many of these systems have high quality assurance standards that must be met to ensure adequate nuclear safety. Also many of these systems contain obsolete hardware along with software that is not easily transported to newer technology computer equipment. Combining modern technology upgrades into a system of obsolete hardware components is not an easy task. Lastly, as users become more accustomed to using modern technology computer systems in other areas of the station (e.g. information systems), their expectations of the capabilities of the plant systems increase. This paper will present three areas of the Darlington NGS fuel handling computer system that have been or are in the process of being upgraded to current technology components within the framework of an existing fuel handling control system. (author). 3 figs.

  9. Cask system design guidance for robotic handling

    International Nuclear Information System (INIS)

    Griesmeyer, J.M.; Drotning, W.D.; Morimoto, A.K.; Bennett, P.C.

    1990-10-01

    Remote automated cask handling has the potential to reduce both the occupational exposure and the time required to process a nuclear waste transport cask at a handling facility. The ongoing Advanced Handling Technologies Project (AHTP) at Sandia National Laboratories is described. AHTP was initiated to explore the use of advanced robotic systems to perform cask handling operations at handling facilities for radioactive waste, and to provide guidance to cask designers regarding the impact of robotic handling on cask design. The proof-of-concept robotic systems developed in AHTP are intended to extrapolate from currently available commercial systems to the systems that will be available by the time that a repository would be open for operation. The project investigates those cask handling operations that would be performed at a nuclear waste repository facility during cask receiving and handling. The ongoing AHTP indicates that design guidance, rather than design specification, is appropriate, since the requirements for robotic handling do not place severe restrictions on cask design but rather focus on attention to detail and design for limited dexterity. The cask system design features that facilitate robotic handling operations are discussed, and results obtained from AHTP design and operation experience are summarized. The application of these design considerations is illustrated by discussion of the robot systems and their operation on cask feature mock-ups used in the AHTP project. 11 refs., 11 figs

  10. DISPOSAL CONTAINER HANDLING SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    E. F. Loros

    2000-06-30

    . This includes the primary hot cell bounded by the receiving area and WP transport exit air locks; and isolation doors at ATS, CTS, and Waste Package Remediation. The hot cell includes areas for welding, various staging, tilting, and WP transporter loading. There are associated operating galleries and equipment maintenance areas outside the hot cell. These areas operate concurrently to accommodate the DC/WP throughput rates and support system maintenance. The new DC preparation area is located in an unshielded structure. The handling equipment includes DC/WP bridge cranes, tilting stations, and horizontal transfer carts. The welding area includes DC/WP welders and staging stations. Welding operations are supported by remotely operated equipment including a bridge crane and hoists, welder jib cranes, welding turntables, and manipulators. WP transfer includes a transfer/decontamination and transporter load area. The transfer operations are supported by a remotely operated horizontal lifting system, decontamination system, decontamination and inspection manipulator, and a WP horizontal transfer cart. All handling operations are supported by a suite of fixtures including collars, yokes, lift beams, and lid attachments. Remote equipment is designed to facilitate decontamination and maintenance. Interchangeable components are provided where appropriate. Set-aside areas are included, as required, for fixtures and tooling to support off-normal and recovery operations. Semi-automatic, manual, and backup control methods support normal, maintenance, and recovery operations. The system interfaces with the ATS and CTS to provide empty and receive loaded DCs. The Waste Emplacement/Retrieval System interfaces are for loading/unloading WPs on/from the transporter. The system also interfaces with the Waste Package Remediation System for DC/WP repair. The system is housed, shielded, supported, and has ventilation boundaries by the Waste Handling Building (WHB). The system is ventilated

  11. Apparatus for handling control rod drives

    International Nuclear Information System (INIS)

    Akimoto, A.; Watanabe, M.; Yoshida, T.; Sugaya, Z.; Saito, T.; Ishii, Y.

    1979-01-01

    An apparatus for handling control rod drives (CRD's) attached by detachable fixing means to housings mounted in a reactor pressure vessel and each coupled to one of control rods inserted in the reactor pressure vessel is described. The apparatus for handling the CRD's comprise cylindrical housing means, uncoupling means mounted in the housing means for uncoupling each of the control rods from the respective CRD, means mounted on the housing means for effecting attaching and detaching of the fixing means, means for supporting the housing means, and means for moving the support means longitudinally of the CRD

  12. Remote systems and automation in radioactive waste package handling

    International Nuclear Information System (INIS)

    Gneiting, B.C.; Hayward, M.L.

    1987-01-01

    A proof-of-principle test was conducted at the Hanford Engineering Development Laboratory (HEDL) to demonstrate the feasibility of performing cask receiving and unloading operations in a remote and partially automated manner. This development testing showed feasibility of performing critical cask receipt, preparation, and unloading operations from a single control station using remote controls and indirect viewing. Using robotics and remote automation in a cask handling system can result in lower personnel exposure levels and cask turnaround times while maintaining operational flexibility. An automated cask handling system presents a flexible state-of-the-art, cost effective alternative solution to hands-on methods that have been used in the past. 7 refs., 13 figs

  13. Interoperability of remote handling control system software modules at Divertor Test Platform 2 using middleware

    Energy Technology Data Exchange (ETDEWEB)

    Tuominen, Janne, E-mail: janne.m.tuominen@tut.fi [Tampere University of Technology, Department of Intelligent Hydraulics and Automation, Tampere (Finland); Rasi, Teemu; Mattila, Jouni [Tampere University of Technology, Department of Intelligent Hydraulics and Automation, Tampere (Finland); Siuko, Mikko [VTT, Technical Research Centre of Finland, Tampere (Finland); Esque, Salvador [F4E, Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla2, 08019, Barcelona (Spain); Hamilton, David [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2013-10-15

    Highlights: ► The prototype DTP2 remote handling control system is a heterogeneous collection of subsystems, each realizing a functional area of responsibility. ► Middleware provides well-known, reusable solutions to problems, such as heterogeneity, interoperability, security and dependability. ► A middleware solution was selected and integrated with the DTP2 RH control system. The middleware was successfully used to integrate all relevant subsystems and functionality was demonstrated. -- Abstract: This paper focuses on the inter-subsystem communication channels in a prototype distributed remote handling control system at Divertor Test Platform 2 (DTP2). The subsystems are responsible for specific tasks and, over the years, their development has been carried out using various platforms and programming languages. The communication channels between subsystems have different priorities, e.g. very high messaging rate and deterministic timing or high reliability in terms of individual messages. Generally, a control system's communication infrastructure should provide interoperability, scalability, performance and maintainability. An attractive approach to accomplish this is to use a standardized and proven middleware implementation. The selection of a middleware can have a major cost impact in future integration efforts. In this paper we present development done at DTP2 using the Object Management Group's (OMG) standard specification for Data Distribution Service (DDS) for ensuring communications interoperability. DDS has gained a stable foothold especially in the military field. It lacks a centralized broker, thereby avoiding a single-point-of-failure. It also includes an extensive set of Quality of Service (QoS) policies. The standard defines a platform- and programming language independent model and an interoperability wire protocol that enables DDS vendor interoperability, allowing software developers to avoid vendor lock-in situations.

  14. Control panel handling of a nuclear simulator

    International Nuclear Information System (INIS)

    Martin Polo, F.; Jimenez Fraustro, L.A.; Banuelos Galindo, A.; Diamant Rubinstein, A.

    1985-01-01

    The handling of the control panels for a Nuclear Simulator for operating training is described. The control panels are handled by a set of intelligent controllers, each with at least two processors (8035 - Communications Controller and a 8085 - Master processor). The Controllers are connected to the main computers (Two dual processor Gould concept 32/6780 and a single processor Gould concept 32/6705) via serial asynchronous channels in a multidrop, star-like architecture. The controllers transmit to the main computers only the changes detected and receive the whole set of output variables as computed by the mathematical models of the Nuclear Plant

  15. Recommendations for cask features for robotic handling from the Advanced Handling Technology Project

    International Nuclear Information System (INIS)

    Drotning, W.

    1991-02-01

    This report describes the current status and recent progress in the Advanced Handling Technology Project (AHTP) initiated to explore the use of advanced robotic systems and handling technologies to perform automated cask handling operations at radioactive waste handling facilities, and to provide guidance to cask designers on the impact of robotic handling on cask design. Current AHTP tasks have developed system mock-ups to investigate robotic manipulation of impact limiters and cask tiedowns. In addition, cask uprighting and transport, using computer control of a bridge crane and robot, were performed to demonstrate the high speed cask transport operation possible under computer control. All of the current AHTP tasks involving manipulation of impact limiters and tiedowns require robotic operations using a torque wrench. To perform these operations, a pneumatic torque wrench and control system were integrated into the tool suite and control architecture of the gantry robot. The use of captured fasteners is briefly discussed as an area where alternative cask design preferences have resulted from the influence of guidance for robotic handling vs traditional operations experience. Specific robotic handling experiences with these system mock-ups highlight a number of continually recurring design principles: (1) robotic handling feasibility is improved by mechanical designs which emphasize operation with limited dexterity in constrained workspaces; (2) clearances, tolerances, and chamfers must allow for operations under actual conditions with consideration for misalignment and imprecise fixturing; (3) successful robotic handling is enhanced by including design detail in representations for model-based control; (4) robotic handling and overall quality assurance are improved by designs which eliminate the use of loose, disassembled parts. 8 refs., 15 figs

  16. ATA diagnostic data handling system: an overview

    International Nuclear Information System (INIS)

    Chambers, F.W.; Kallman, J.; McDonald, J.; Slominski, M.

    1984-01-01

    The functions to be performed by the ATA diagnostic data handling system are discussed. The capabilities of the present data acquisition system (System 0) are presented. The goals for the next generation acquisition system (System 1), currently under design, are discussed. Facilities on the Octopus system for data handling are reviewed. Finally, we discuss what has been learned about diagnostics and computer based data handling during the past year

  17. SITE GENERATED RADIOLOGICAL WASTE HANDLING SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    S. C. Khamankar

    2000-06-20

    The Site Generated Radiological Waste Handling System handles radioactive waste products that are generated at the geologic repository operations area. The waste is collected, treated if required, packaged for shipment, and shipped to a disposal site. Waste streams include low-level waste (LLW) in solid and liquid forms, as-well-as mixed waste that contains hazardous and radioactive constituents. Liquid LLW is segregated into two streams, non-recyclable and recyclable. The non-recyclable stream may contain detergents or other non-hazardous cleaning agents and is packaged for shipment. The recyclable stream is treated to recycle a large portion of the water while the remaining concentrated waste is packaged for shipment; this greatly reduces the volume of waste requiring disposal. There will be no liquid LLW discharge. Solid LLW consists of wet solids such as ion exchange resins and filter cartridges, as-well-as dry active waste such as tools, protective clothing, and poly bags. Solids will be sorted, volume reduced, and packaged for shipment. The generation of mixed waste at the Monitored Geologic Repository (MGR) is not planned; however, if it does come into existence, it will be collected and packaged for disposal at its point of occurrence, temporarily staged, then shipped to government-approved off-site facilities for disposal. The Site Generated Radiological Waste Handling System has equipment located in both the Waste Treatment Building (WTB) and in the Waste Handling Building (WHB). All types of liquid and solid LLW are processed in the WTB, while wet solid waste from the Pool Water Treatment and Cooling System is packaged where received in the WHB. There is no installed hardware for mixed waste. The Site Generated Radiological Waste Handling System receives waste from locations where water is used for decontamination functions. In most cases the water is piped back to the WTB for processing. The WTB and WHB provide staging areas for storing and shipping LLW

  18. SITE GENERATED RADIOLOGICAL WASTE HANDLING SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    S. C. Khamankar

    2000-01-01

    The Site Generated Radiological Waste Handling System handles radioactive waste products that are generated at the geologic repository operations area. The waste is collected, treated if required, packaged for shipment, and shipped to a disposal site. Waste streams include low-level waste (LLW) in solid and liquid forms, as-well-as mixed waste that contains hazardous and radioactive constituents. Liquid LLW is segregated into two streams, non-recyclable and recyclable. The non-recyclable stream may contain detergents or other non-hazardous cleaning agents and is packaged for shipment. The recyclable stream is treated to recycle a large portion of the water while the remaining concentrated waste is packaged for shipment; this greatly reduces the volume of waste requiring disposal. There will be no liquid LLW discharge. Solid LLW consists of wet solids such as ion exchange resins and filter cartridges, as-well-as dry active waste such as tools, protective clothing, and poly bags. Solids will be sorted, volume reduced, and packaged for shipment. The generation of mixed waste at the Monitored Geologic Repository (MGR) is not planned; however, if it does come into existence, it will be collected and packaged for disposal at its point of occurrence, temporarily staged, then shipped to government-approved off-site facilities for disposal. The Site Generated Radiological Waste Handling System has equipment located in both the Waste Treatment Building (WTB) and in the Waste Handling Building (WHB). All types of liquid and solid LLW are processed in the WTB, while wet solid waste from the Pool Water Treatment and Cooling System is packaged where received in the WHB. There is no installed hardware for mixed waste. The Site Generated Radiological Waste Handling System receives waste from locations where water is used for decontamination functions. In most cases the water is piped back to the WTB for processing. The WTB and WHB provide staging areas for storing and shipping LLW

  19. Versatile cable handling mechanisms for remote operator control

    Energy Technology Data Exchange (ETDEWEB)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D. [Portech Ltd., Portsmouth (United Kingdom)

    1996-12-31

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (Author).

  20. Versatile cable handling mechanisms for remote operator control

    International Nuclear Information System (INIS)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D.

    1996-01-01

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (Author)

  1. Versatile cable handling mechanisms for remote operator control

    International Nuclear Information System (INIS)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D.

    1996-01-01

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other, between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (UK)

  2. Feasibility study of CANDU-9 fuel handling system

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Jeong Ki; Jo, C. H.; Kim, H. M.

    1996-12-01

    CANDU`s combination of natural uranium, heavy water and on-power refuelling is unique in its design and remarkable for reliable power production. In order to offer more output, better site utilization, shorter construction time, improved station layout, safety enhancements and better control panel layout, CANDU-9 is now under development with design improvement added to all proven CANDU advantages or applicable technologies. One of its major improvement has been applied to fuel handling system. This system is very similar to that of CANDU-3, and some parts of the system are applied to those of the existing CANDU-6 or CANDU-9. Design concepts and design requirements of fuel handling system for CANDU-9 have been identified to compare with those of the existing CANDU and the design feasibilities have been evaluated. (author). 4 tabs., 13 figs., 9 refs.

  3. Evolution of a test article handling system for the SP-100 GES test

    International Nuclear Information System (INIS)

    Shen, E.J.; Schweiger, L.J.; Miller, W.C.; Gluck, R.; Davies, S.M.

    1987-01-01

    A simulated space environment test of a flight prototypic SP-100 reactor, control system, and flight shield will be conducted at the Hanford Engineering Development Laboratory (HEDL). The flight prototypic components and the supporting primary heat removal system are collectively known as the nuclear assembly test article (TA). The unique configuration and materials of fabrication for the Test Article require a specialized handling facility to support installation, maintenance, and final disposal operation. The test site operator, working in conjunction with the test article supplier, developed and evaluated several handling concepts resulting in the selection of a reference test article handling system. The development of the reference concept for the handling system is presented

  4. Data handling at EBR-II [Experimental Breeder Reactor II] for advanced diagnostics and control work

    International Nuclear Information System (INIS)

    Lindsay, R.W.; Schorzman, L.W.

    1988-01-01

    Improved control and diagnostics systems are being developed for nuclear and other applications. The Experimental Breeder Reactor II (EBR-II) Division of Argonne National Laboratory has embarked on a project to upgrade the EBR-II control and data handling systems. The nature of the work at EBR-II requires that reactor plant data be readily available for experimenters, and that the plant control systems be flexible to accommodate testing and development needs. In addition, operational concerns require that improved operator interfaces and computerized diagnostics be included in the reactor plant control system. The EBR-II systems have been upgraded to incorporate new data handling computers, new digital plant process controllers, and new displays and diagnostics are being developed and tested for permanent use. In addition, improved engineering surveillance will be possible with the new systems

  5. Mockup of an automated material transport system for remote handling

    International Nuclear Information System (INIS)

    Porter, M.L.

    1992-01-01

    An Automated Material Transport System (AMTS) was identified for transport of samples within a Material and Process Control Laboratory (MPCL). The MPCL was designed with a dry sample handling laboratory and a wet chemistry analysis laboratory. Each laboratory contained several processing gloveboxes. The function of the AMTS was to automate the handling of materials, multiple process samples, and bulky items between process stations with a minimum of operator intervention and with minimum o[ waiting periods and nonproductive activities. This paper discusses the system design features, capabilities and results of initial testing. The overall performance of the AMTS is very good. No major problems or concerns were identified. System commands are simple and logical making the system user friendly. Operating principle and design of individual components is simple. With the addition of various track modules, the system can be configured in most any configuration. The AMTS lends itself very well for integration with other automated systems or products. The AMTS is suited for applications involving light payloads which require multiple sample and material handling, lot tracking, and system integration with other products

  6. EBR-II argon cooling system restricted fuel handling I and C upgrade

    International Nuclear Information System (INIS)

    Start, S.E.; Carlson, R.B.; Gehrman, R.L.

    1995-01-01

    The instrumentation and control of the Argon Cooling System (ACS) restricted fuel handling control system at Experimental Breeder Reactor II (EBR-II) is being upgraded from a system comprised of many discrete components and controllers to a computerized system with a graphical user interface (GUI). This paper describes the aspects of the upgrade including reasons for the upgrade, the old control system, upgrade goals, design decisions, philosophies and rationale, and the new control system hardware and software

  7. System design for safe robotic handling of nuclear materials

    International Nuclear Information System (INIS)

    Drotning, W.; Wapman, W.; Fahrenholtz, J.; Kimberly, H.; Kuhlmann, J.

    1996-01-01

    Robotic systems are being developed by the Intelligent Systems and Robotics Center at Sandia National Laboratories to perform automated handling tasks with radioactive nuclear materials. These systems will reduce the occupational radiation exposure to workers by automating operations which are currently performed manually. Because the robotic systems will handle material that is both hazardous and valuable, the safety of the operations is of utmost importance; assurance must be given that personnel will not be harmed and that the materials and environment will be protected. These safety requirements are met by designing safety features into the system using a layered approach. Several levels of mechanical, electrical and software safety prevent unsafe conditions from generating a hazard, and bring the system to a safe state should an unexpected situation arise. The system safety features include the use of industrial robot standards, commercial robot systems, commercial and custom tooling, mechanical safety interlocks, advanced sensor systems, control and configuration checks, and redundant control schemes. The effectiveness of the safety features in satisfying the safety requirements is verified using a Failure Modes and Effects Analysis. This technique can point out areas of weakness in the safety design as well as areas where unnecessary redundancy may reduce the system reliability

  8. Torus sector handling system

    International Nuclear Information System (INIS)

    Grisham, D.L.

    1981-01-01

    A remote handling system is proposed for moving a torus sector of the accelerator from under the cryostat to a point where it can be handled by a crane and for the reverse process for a new sector. Equipment recommendations are presented, as well as possible alignment schemes. Some general comments about future remote-handling methods and the present capabilities of existing systems will also be included. The specific task to be addressed is the removal and replacement of a 425 to 450 ton torus sector. This requires a horizontal movement of approx. 10 m from a normal operating position to a point where its further transport can be accomplished by more conventional means (crane or floor transporter). The same horizontal movement is required for reinstallation, but a positional tolerance of 2 cm is required to allow reasonable fit-up for the vacuum seal from the radial frames to the torus sector. Since the sectors are not only heavy but rather tall and narrow, the transport system must provide a safe, stable, and repeatable method fo sector movement. This limited study indicates that the LAMPF-based method of transporting torus sectors offers a proven method of moving heavy items. In addition, the present state of the art in remote equipment is adequate for FED maintenance

  9. Concept Design of the Payload Handling Manipulator System. [space shuttle orbiters

    Science.gov (United States)

    1975-01-01

    The design, requirements, and interface definition of a remote manipulator system developed to handle orbiter payloads are presented. End effector design, control system concepts, and man-machine engineering are considered along with crew station requirements and closed circuit television system performance requirements.

  10. Vehicle handling and stability control by the cooperative control of 4WS and DYC

    Science.gov (United States)

    Shen, Huan; Tan, Yun-Sheng

    2017-07-01

    This paper proposes an integrated control system that cooperates with the four-wheel steering (4WS) and direct yaw moment control (DYC) to improve the vehicle handling and stability. The design works of the four-wheel steering and DYC control are based on sliding mode control. The integration control system produces the suitable 4WS angle and corrective yaw moment so that the vehicle tracks the desired yaw rate and sideslip angle. Considering the change of the vehicle longitudinal velocity that means the comfort of driving conditions, both the driving torque and braking torque are used to generate the corrective yaw moment. Simulation results show the effectiveness of the proposed control algorithm.

  11. Sequence trajectory generation for garment handling systems

    OpenAIRE

    Liu, Honghai; Lin, Hua

    2008-01-01

    This paper presents a novel generic approach to the planning strategy of garment handling systems. An assumption is proposed to separate the components of such systems into a component for intelligent gripper techniques and a component for handling planning strategies. Researchers can concentrate on one of the two components first, then merge the two problems together. An algorithm is addressed to generate the trajectory position and a clothes handling sequence of clothes partitions, which ar...

  12. The FMEA Analysis for Fuel Handling System at Cernavoda Unit 2

    International Nuclear Information System (INIS)

    Park, Jin Hee; Kim, Tae Woon; Rhee, Bo Wook; Yoon, Chul; Kim, Hyeong Tae; Cho, In Gil; Kim, Seong Ho

    2006-01-01

    A Nuclear Safety Evaluation was performed by an independent assessor at the request of the regulatory authority CNCAN (Comisia Nationala pentru Controlul Activitatilor Nucleare. National Committee for Nuclear Activities Control in Romania) to provide an independent overview of all the nuclear safety aspects of Cernavoda Unit 2 under construction and an expert opinion whether the completed Cernavoda Unit-2 Nuclear Power Plant would satisfy current Western European nuclear safety objectives and practices. A report was produced (Cernavoda 2 Nuclear Safety Expert Project, 'Task 10 . Safety Evaluation Report', A.F.Parsons, NNC Limited, December 2001) and contains recommendations either mandatory or advisory. The FMEA study, one of the mandatory recommendations, is performing now for fuel handling system and radioactive waste handling system for Cernavoda unit 2 in Romania sponsored by KHNP. In this paper, only the FMEA study for fuel handling system is presented

  13. Controlling fugitive dust emissions in material handling operations

    Energy Technology Data Exchange (ETDEWEB)

    Tooker, G E

    1992-05-01

    The primary mechanism of fugitive dust generation in bulk material handling transfer operations is by dispersion of dust in turbulent air induced to flow with falling or projected material streams. This paper returns to basic theories of particle dynamics and fluid mechanics to quantify the dust generating mechanism by rational analysis. Calculations involving fluid mechanisms are made easier by the availability of the personal computer and the many math manipulating programs. Rational analysis is much more cost effective when estimating collection air volumes to control fugitive emissions; especially in enclosed material handling transfers transporting large volumes of dusty material. Example calculations, using a typical enclosed conveyor-to-conveyor transfer operation are presented to illustrate and highlight the key parameters that determine the magnitude of induced air flow that must be controlled. The methods presented in this paper for estimating collection air volumes apply only enclosed material handling transfers, exhausted to a dust collector. Since some assistance to the control of dust emissions must be given by the material handling transfer chute design, a discussion of good transfer chute design practice is presented. 4 refs., 2 figs., 2 tabs.

  14. Wind turbine control with constraint handling: a model predictive control approach

    DEFF Research Database (Denmark)

    Henriksen, Lars Christian; Hansen, Morten Hartvig; Poulsen, Niels Kjølstad

    2012-01-01

    on model predictive control, a control method well suited for constraint handling. The performance of the presented controller during an extreme operating gust is compared to that of a proportional-integral controller with integrator anti-windup. Furthermore, the presented controller-s capability...

  15. Remote-handled transuranic system assessment appendices. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    Volume 2 of this report contains six appendices to the report: Inventory and generation of remote-handled transuranic waste; Remote-handled transuranic waste site storage; Characterization of remote-handled transuranic waste; RH-TRU waste treatment alternatives system analysis; Packaging and transportation study; and Remote-handled transuranic waste disposal alternatives.

  16. Remote-handled transuranic system assessment appendices. Volume 2

    International Nuclear Information System (INIS)

    1995-11-01

    Volume 2 of this report contains six appendices to the report: Inventory and generation of remote-handled transuranic waste; Remote-handled transuranic waste site storage; Characterization of remote-handled transuranic waste; RH-TRU waste treatment alternatives system analysis; Packaging and transportation study; and Remote-handled transuranic waste disposal alternatives

  17. 30 CFR 75.817 - Cable handling and support systems.

    Science.gov (United States)

    2010-07-01

    ... High-Voltage Longwalls § 75.817 Cable handling and support systems. Longwall mining equipment must be provided with cable-handling and support systems that are constructed, installed and maintained to minimize... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Cable handling and support systems. 75.817...

  18. Remote handling machines

    International Nuclear Information System (INIS)

    Sato, Shinri

    1985-01-01

    In nuclear power facilities, the management of radioactive wastes is made with its technology plus the automatic techniques. Under the radiation field, the maintenance or aid of such systems is important. To cope with this situation, MF-2 system, MF-3 system and a manipulator system as remote handling machines are described. MF-2 system consists of an MF-2 carrier truck, a control unit and a command trailer. It is capable of handling heavy-weight objects. The system is not by hydraulic but by electrical means. MF-3 system consists of a four-crawler truck and a manipulator. The truck is versatile in its posture by means of the four independent crawlers. The manipulator system is bilateral in operation, so that the delicate handling is made possible. (Mori, K.)

  19. Automated system for handling tritiated mixed waste

    International Nuclear Information System (INIS)

    Dennison, D.K.; Merrill, R.D.; Reitz, T.C.

    1995-03-01

    Lawrence Livermore National Laboratory (LLNL) is developing a semi system for handling, characterizing, processing, sorting, and repackaging hazardous wastes containing tritium. The system combines an IBM-developed gantry robot with a special glove box enclosure designed to protect operators and minimize the potential release of tritium to the atmosphere. All hazardous waste handling and processing will be performed remotely, using the robot in a teleoperational mode for one-of-a-kind functions and in an autonomous mode for repetitive operations. Initially, this system will be used in conjunction with a portable gas system designed to capture any gaseous-phase tritium released into the glove box. This paper presents the objectives of this development program, provides background related to LLNL's robotics and waste handling program, describes the major system components, outlines system operation, and discusses current status and plans

  20. Equipment for the handling of thorium materials

    International Nuclear Information System (INIS)

    Heisler, S.W. Jr.; Mihalovich, G.S.

    1988-01-01

    The Feed Materials Production Center (FMPC) is the United States Department of Energy's storage facility for thorium. FMPC thorium handling and overpacking projects ensure the continued safe handling and storage of the thorium inventory until final disposition of the materials is determined and implemented. The handling and overpacking of the thorium materials requires the design of a system that utilizes remote handling and overpacking equipment not currently utilized at the FMPC in the handling of uranium materials. The use of remote equipment significantly reduces radiation exposure to personnel during the handling and overpacking efforts. The design system combines existing technologies from the nuclear industry, the materials processing and handling industry and the mining industry. The designed system consists of a modified fork lift truck for the transport of thorium containers, automated equipment for material identification and inventory control, and remote handling and overpacking equipment for material identification and inventory control, and remote handling and overpacking equipment for repackaging of the thorium materials

  1. SRV-automatic handling device

    International Nuclear Information System (INIS)

    Yamada, Koji

    1987-01-01

    Automatic handling device for the steam relief valves (SRV's) is developed in order to achieve a decrease in exposure of workers, increase in availability factor, improvement in reliability, improvement in safety of operation, and labor saving. A survey is made during a periodical inspection to examine the actual SVR handling operation. An SRV automatic handling device consists of four components: conveyor, armed conveyor, lifting machine, and control/monitoring system. The conveyor is so designed that the existing I-rail installed in the containment vessel can be used without any modification. This is employed for conveying an SRV along the rail. The armed conveyor, designed for a box rail, is used for an SRV installed away from the rail. By using the lifting machine, an SRV installed away from the I-rail is brought to a spot just below the rail so that the SRV can be transferred by the conveyor. The control/monitoring system consists of a control computer, operation panel, TV monitor and annunciator. The SRV handling device is operated by remote control from a control room. A trial equipment is constructed and performance/function testing is carried out using actual SRV's. As a result, is it shown that the SRV handling device requires only two operators to serve satisfactorily. The required time for removal and replacement of one SRV is about 10 minutes. (Nogami, K.)

  2. CANDU-9/480-SEU fuel handling system assessment document

    International Nuclear Information System (INIS)

    Hwang, Jeong Ki; Jo, C. H.; Kim, H. M.; Morikawa, D. T.

    1996-11-01

    This report summarize the rationale for the CANDU 9 fuel handling system, and the design choices recommended for components of the system. Some of the design requirements applicable to the CANDU 9 480-SEU fuel handling design choices are described. These requirements imposed by the CANDU 9 project. And the design features for the key components of fuel handling system, such as the fuelling machine, the carriage, the new fuel transfer system and the irradiated fuel transfer system, are described. The carriage seismic load evaluations relevant to the design are contained in the appendices. The majority of the carriage components are acceptable, or will likely be acceptable with some redesign. The concept for the CANDU 9 fuel handling system is based on proven CANDU designs, or on improved CANDU technology. Although some development work must be done, the fuel handling concept is judged to be feasible for the CANDU 9 480-SEU reactor. (author). 2 refs

  3. Haptic shared control improves hot cell remote handling despite controller inaccuracies

    NARCIS (Netherlands)

    van Oosterhout, J.; Abbink, D. A.; Koning, J. F.; Boessenkool, H.; Wildenbeest, J. G. W.; Heemskerk, C. J. M.

    2013-01-01

    A promising solution to improve task performance in ITER hot cell remote handling is the use of haptic shared control. Haptic shared control can assist the human operator along a safe and optimal path with continuous guiding forces from an intelligent autonomous controller. Previous research tested

  4. Inverse simulation system for evaluating handling qualities during rendezvous and docking

    Science.gov (United States)

    Zhou, Wanmeng; Wang, Hua; Thomson, Douglas; Tang, Guojin; Zhang, Fan

    2017-08-01

    The traditional method used for handling qualities assessment of manned space vehicles is too time-consuming to meet the requirements of an increasingly fast design process. In this study, a rendezvous and docking inverse simulation system to assess the handling qualities of spacecraft is proposed using a previously developed model-predictive-control architecture. By considering the fixed discrete force of the thrusters of the system, the inverse model is constructed using the least squares estimation method with a hyper-ellipsoidal restriction, the continuous control outputs of which are subsequently dispersed by pulse width modulation with sensitivity factors introduced. The inputs in every step are deemed constant parameters, and the method could be considered as a general method for solving nominal, redundant, and insufficient inverse problems. The rendezvous and docking inverse simulation is applied to a nine-degrees-of-freedom platform, and a novel handling qualities evaluation scheme is established according to the operation precision and astronauts' workload. Finally, different nominal trajectories are scored by the inverse simulation and an established evaluation scheme. The scores can offer theoretical guidance for astronaut training and more complex operation missions.

  5. Advanced handling-systems with enhanced performance flexibility

    International Nuclear Information System (INIS)

    1986-04-01

    This report describes the results of a project related to future applications and requirements for advanced handling systems. This report consists of six chapters. Following the description of the aims the tools for setting up the requirements for the handling systems including the experience during the data acquisition process is described. Furthermore some information is given about the current state of the art of robotics and manipulators. Of paramount importance are the descriptions of applications and related concepts in the following chapters leading to specific categories of advanced handling units. The paper closes with the description of the first concepts for realization. (orig./HP) [de

  6. Robot vision system R and D for ITER blanket remote-handling system

    International Nuclear Information System (INIS)

    Maruyama, Takahito; Aburadani, Atsushi; Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Tesini, Alessandro

    2014-01-01

    For regular maintenance of the International Thermonuclear Experimental Reactor (ITER), a system called the ITER blanket remote-handling system is necessary to remotely handle the blanket modules because of the high levels of gamma radiation. Modules will be handled by robotic power manipulators and they must have a non-contact-sensing system for installing and grasping to avoid contact with other modules. A robot vision system that uses cameras was adopted for this non-contact-sensing system. Experiments for grasping modules were carried out in a dark room to simulate the environment inside the vacuum vessel and the robot vision system's measurement errors were studied. As a result, the accuracy of the manipulator's movements was within 2.01 mm and 0.31°, which satisfies the system requirements. Therefore, it was concluded that this robot vision system is suitable for the non-contact-sensing system of the ITER blanket remote-handling system

  7. Robot vision system R and D for ITER blanket remote-handling system

    Energy Technology Data Exchange (ETDEWEB)

    Maruyama, Takahito, E-mail: maruyama.takahito@jaea.go.jp [Japan Atomic Energy Agency, Fusion Research and Development Directorate, Naka, Ibaraki-ken 311-0193 (Japan); Aburadani, Atsushi; Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka [Japan Atomic Energy Agency, Fusion Research and Development Directorate, Naka, Ibaraki-ken 311-0193 (Japan); Tesini, Alessandro [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul Lez Durance (France)

    2014-10-15

    For regular maintenance of the International Thermonuclear Experimental Reactor (ITER), a system called the ITER blanket remote-handling system is necessary to remotely handle the blanket modules because of the high levels of gamma radiation. Modules will be handled by robotic power manipulators and they must have a non-contact-sensing system for installing and grasping to avoid contact with other modules. A robot vision system that uses cameras was adopted for this non-contact-sensing system. Experiments for grasping modules were carried out in a dark room to simulate the environment inside the vacuum vessel and the robot vision system's measurement errors were studied. As a result, the accuracy of the manipulator's movements was within 2.01 mm and 0.31°, which satisfies the system requirements. Therefore, it was concluded that this robot vision system is suitable for the non-contact-sensing system of the ITER blanket remote-handling system.

  8. Research on Handling Stability of Steering-by-wire System

    Directory of Open Access Journals (Sweden)

    Yuan Ying

    2017-01-01

    Full Text Available The main function of steer-by-wire (SBW system are improving steering characteristics, security and stability of the vehicle. In this paper, the variable steering ratio of SBW system is analyzed, and the method of steering ratio based on fuzzy control and neural network are researched. In order to solve the actual working condition, the wheel angle may not reach the expected value, this paper establishes a twodegree-of-freedom (2-DOF vehicle model, and a Matlab/Simulink simulation model, in which a control strategy based on PID controller is put forward to control the front wheel steering angle. Simulation results show that proposed control strategy based on fuzzy neural network can effectively reduce lateral deviation and improve the handling stability and comfortability of the vehicle.

  9. A graphics based remote handling control system

    International Nuclear Information System (INIS)

    Leinemann, K.

    1984-08-01

    A control and simulation system with an interactive graphic man-machine interface is proposed for the articulated boom in JET. The system shall support 1. the study of boom movements in the planning phase, 2. the training of operators by appropriate simulations, 3. the programming of boom movements, and 4. the on-line control of the boom. A combination of computer graphic display and TV-images is proposed for providing optimum recognition of the actual situation and for echoing to the operator actions. (orig.) [de

  10. Specification of EDITH motion control system

    International Nuclear Information System (INIS)

    Breitwieser, H.; Frank, A.; Holler, E.; Suess, U.; Leinemann, K.

    1990-09-01

    EDITH is an experimental device for in vessel handling at NET/ITER. The purpose of EDITH is: Testing of ABS (articulated boom system) components; testing and validation of remote handling procedures; testing and validation of ABS end-effectors; testing of ABS control system features and verification of control system concepts. This document, after describing the environment in which the control system is to operate, specifies architecture and functionality to be implemented by the EDITH motion control system software, thereby taking full reference to the control system specification for TARM, which was decided to be the base for the implementation. (orig.) [de

  11. Evolution of the design of fuel handling control system in 220 MWe Indian PHWRs

    International Nuclear Information System (INIS)

    Dhruvanarayana, L.; Gupta, H.; Bharathkumar, M.

    1996-01-01

    Following two CANDU type reactors at Rajasthan (RAPS-1 and 2), three nuclear power stations, each of two units of 220 MWe has been in operation at Rajasthan (RAPS-1 and 2). Madras (MAPS-1 and 2). Narora (NAPS-1 and 2) and Kakrapar (KAPS-1 and 2). Two more stations, also of 220 MWe capacity, are under construction at Rajasthan (RAPP-3 and 4) and Kaiga (Kaiga-1 and 2). These are natural uranium fuelled pressurized heavy water cooled and heavy water moderated reactors (PHWRs). The two units at Rajasthan viz RAPS-1 and 2, were built with the technical collaboration with Canada, and the rest of the units have been designed and built indigenously, incorporating a number of modifications, particularly in the on-power refuelling system. The evolution of the design of the Fuel Handling Control systems of these reactors, taking into consideration operational needs, safety aspects and maintainability are highlighted in this paper. A combination of hydraulic and electronic control has been provided to enable the operations. In RAPS-1 and 2, hardwired electronic controls were provided, while in MAPS-1 and 2, the hardwired system was improved. From NAPS onwards, a computerized control system with hardwired interlock logic has been provided. New devices like coarse-fine potentiometers, special oil filled potentiometer assembly, rectilinear potentiometers etc., were specified from NAPS onwards. Positioning logic is computerized providing flexibility and expendability. Digital panel meters and indicating lamps have been provided for manual mode operations, while CRT (cathode-ray tube) monitors help in computer mode operations. Hydraulic controls which comprise D 2 0 hydraulics, H 2 0 hydraulics and oil hydraulics have been improved from NAPS onwards. Hydraulic panels have been relocated in accessible areas to reduce radiation doses and for better maintainability. All electric drives including X and Y drives were modified as hydraulic drives for better control. New types of valves

  12. Evolution of the design of fuel handling control system in 220 MWe Indian PHWRs

    Energy Technology Data Exchange (ETDEWEB)

    Dhruvanarayana, L; Gupta, H; Bharathkumar, M [Nuclear Power Corporation of India Ltd., Mumbai (India)

    1997-12-31

    Following two CANDU type reactors at Rajasthan (RAPS-1 and 2), three nuclear power stations, each of two units of 220 MWe has been in operation at Rajasthan (RAPS-1 and 2). Madras (MAPS-1 and 2). Narora (NAPS-1 and 2) and Kakrapar (KAPS-1 and 2). Two more stations, also of 220 MWe capacity, are under construction at Rajasthan (RAPP-3 and 4) and Kaiga (Kaiga-1 and 2). These are natural uranium fuelled pressurized heavy water cooled and heavy water moderated reactors (PHWRs). The two units at Rajasthan viz RAPS-1 and 2, were built with the technical collaboration with Canada, and the rest of the units have been designed and built indigenously, incorporating a number of modifications, particularly in the on-power refuelling system. The evolution of the design of the Fuel Handling Control systems of these reactors, taking into consideration operational needs, safety aspects and maintainability are highlighted in this paper. A combination of hydraulic and electronic control has been provided to enable the operations. In RAPS-1 and 2, hardwired electronic controls were provided, while in MAPS-1 and 2, the hardwired system was improved. From NAPS onwards, a computerized control system with hardwired interlock logic has been provided. New devices like coarse-fine potentiometers, special oil filled potentiometer assembly, rectilinear potentiometers etc., were specified from NAPS onwards. Positioning logic is computerized providing flexibility and expendability. Digital panel meters and indicating lamps have been provided for manual mode operations, while CRT (cathode-ray tube) monitors help in computer mode operations. Hydraulic controls which comprise D{sub 2}0 hydraulics, H{sub 2}0 hydraulics and oil hydraulics have been improved from NAPS onwards. Hydraulic panels have been relocated in accessible areas to reduce radiation doses and for better maintainability. All electric drives including X and Y drives were modified as hydraulic drives for better control. New types of

  13. WALS: A sensor-based robotic system for handling nuclear materials

    International Nuclear Information System (INIS)

    Drotning, W.; Kimberly, H.; Wapman, W.

    1997-01-01

    An automated system is being developed for handling large payloads of radioactive nuclear materials in an analytical laboratory. The system uses machine vision and force/torque sensing to provide sensor-based control of the automation system to enhance system safety, flexibility, and robustness and achieve easy remote operation. The automation system also controls the operation of the laboratory measurement systems and the coordination of them with the robotic system. Particular attention has been given to system design features and analytical methods that provide an enhanced level of operational safety. Independent mechanical gripper interlock and too release mechanisms were designed to prevent payload mishandling. An extensive failure modes and effects analysis (FMEA) of the automation system was developed as a safety design analysis tool

  14. Advantage of redundancy in the controllability of remote handling manipulator

    International Nuclear Information System (INIS)

    Muhammad, Ali; Mattila, Jouni; Vilenius, Matti; Siuko, Mikko; Semeraro, Luigi

    2011-01-01

    To carry out a variety of remote handling operations inside the ITER divertor a Water Hydraulic MANipulator (WHMAN) and its control system have been designed and developed at Tampere University of Technology. The manipulator is installed on top of Cassette Multifunctional Mover (CMM) to assist during the cassette removal and installation operations. While CMM is designed to carry heavy components such as cassettes through the service ducts relying on positioning accuracy and repeatability, WHMAN is designed to execute a mix of remote handling operations using position trajectories and master-slave telemanipulation. WHMAN is composed of eight joints: six rotational and two translational. Since a manipulator requires only six joints to acquire the desired position and orientation in operational-space, the two additional joints of WHMAN provide the redundant degrees of mobility. This paper presents how this redundancy of WHMAN can be an advantage to optimize the execution of remote handling tasks. The paper also discusses an effective way to practically exploit the redundancy. The results show that the additional degrees of freedom can be utilized to improve the dynamic behavior of the manipulator.

  15. A sensor-based automation system for handling nuclear materials

    International Nuclear Information System (INIS)

    Drotning, W.; Kimberly, H.; Wapman, W.; Darras, D.

    1997-01-01

    An automated system is being developed for handling large payloads of radioactive nuclear materials in an analytical laboratory. The automation system performs unpacking and repacking of payloads from shipping and storage containers, and delivery of the payloads to the stations in the laboratory. The system uses machine vision and force/torque sensing to provide sensor-based control of the automation system in order to enhance system safety, flexibility, and robustness, and achieve easy remote operation. The automation system also controls the operation of the laboratory measurement systems and the coordination of them with the robotic system. Particular attention has been given to system design features and analytical methods that provide an enhanced level of operational safety. Independent mechanical gripper interlock and tool release mechanisms were designed to prevent payload mishandling. An extensive Failure Modes and Effects Analysis of the automation system was developed as a safety design analysis tool

  16. FY 1984 annual report on the research and development of automatic sewing systems. Cloth handling techniques; 1984 nendo jido hosei system no kenkyu kaihatsu seika hokokusho. Kiji handling gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-03-01

    The automatic sewing system technique research association has been commissioned by the Agency of Industrial Science and Technology for (research and development of automatic sewing systems). This program covers R and D of the elementary techniques for total systems and sewing preparation/processing, sewing/assembling, cloth handling, and system management/control. This report describes the results of the R and D efforts for the cloth handling techniques. The program for the cloth handling techniques covers all techniques related to cloth movement, positioning and processing in each sewing step from cloth receiving to completion of sewing. They include the elementary techniques for (1) cloth holding, (2) high-function positioning, and (3) soft cloth transfer. The program for the techniques (1) constructs, on a trial basis, the basic or functional models, and tests and evaluates them. The program for the techniques (2) classifies work shapes, processing types and processing steps, to help select the positioning methods. The program for the techniques (3) investigates necessary conditions for transfer methods and procedures in each step. (NEDO)

  17. Remote handling systems for the Pride application

    International Nuclear Information System (INIS)

    Kim, K.; Lee, J.; Lee, H.; Kim, S.; Kim, H.

    2010-10-01

    In this paper is described the development of remote handling systems for use in the pyro processing technology development. Remote handling systems mainly include a BDSM (Bridge transported Dual arm Servo-Manipulator) and a simulator, all of which will be applied to the Pride (Pyro process integrated inactive demonstration facility) that is under construction at KAERI. BDMS that will traverse the length of the ceiling is designed to have two pairs of master-slave manipulators of which each pair of master-slave manipulators has a kinematic similarity and a force reflection. A simulator is also designed to provide an efficient means for simulating and verifying the conceptual design, developments, arrangements, and rehearsal of the pyro processing equipment and relevant devices from the viewpoint of remote operation and maintenance. In our research is presented activities and progress made in developing remote handling systems to be used for the remote operation and maintenance of the pyro processing equipment and relevant devices in the Pride. (Author)

  18. The ATLAS Detector Control System

    International Nuclear Information System (INIS)

    Lantzsch, K; Braun, H; Hirschbuehl, D; Kersten, S; Arfaoui, S; Franz, S; Gutzwiller, O; Schlenker, S; Tsarouchas, C A; Mindur, B; Hartert, J; Zimmermann, S; Talyshev, A; Oliveira Damazio, D; Poblaguev, A; Martin, T; Thompson, P D; Caforio, D; Sbarra, C; Hoffmann, D

    2012-01-01

    The ATLAS experiment is one of the multi-purpose experiments at the Large Hadron Collider (LHC) at CERN, constructed to study elementary particle interactions in collisions of high-energy proton beams. Twelve different sub detectors as well as the common experimental infrastructure are controlled and monitored by the Detector Control System (DCS) using a highly distributed system of 140 server machines running the industrial SCADA product PVSS. Higher level control system layers allow for automatic control procedures, efficient error recognition and handling, manage the communication with external systems such as the LHC controls, and provide a synchronization mechanism with the ATLAS data acquisition system. Different databases are used to store the online parameters of the experiment, replicate a subset used for physics reconstruction, and store the configuration parameters of the systems. This contribution describes the computing architecture and software tools to handle this complex and highly interconnected control system.

  19. The ATLAS Detector Control System

    Science.gov (United States)

    Lantzsch, K.; Arfaoui, S.; Franz, S.; Gutzwiller, O.; Schlenker, S.; Tsarouchas, C. A.; Mindur, B.; Hartert, J.; Zimmermann, S.; Talyshev, A.; Oliveira Damazio, D.; Poblaguev, A.; Braun, H.; Hirschbuehl, D.; Kersten, S.; Martin, T.; Thompson, P. D.; Caforio, D.; Sbarra, C.; Hoffmann, D.; Nemecek, S.; Robichaud-Veronneau, A.; Wynne, B.; Banas, E.; Hajduk, Z.; Olszowska, J.; Stanecka, E.; Bindi, M.; Polini, A.; Deliyergiyev, M.; Mandic, I.; Ertel, E.; Marques Vinagre, F.; Ribeiro, G.; Santos, H. F.; Barillari, T.; Habring, J.; Huber, J.; Arabidze, G.; Boterenbrood, H.; Hart, R.; Iakovidis, G.; Karakostas, K.; Leontsinis, S.; Mountricha, E.; Ntekas, K.; Filimonov, V.; Khomutnikov, V.; Kovalenko, S.; Grassi, V.; Mitrevski, J.; Phillips, P.; Chekulaev, S.; D'Auria, S.; Nagai, K.; Tartarelli, G. F.; Aielli, G.; Marchese, F.; Lafarguette, P.; Brenner, R.

    2012-12-01

    The ATLAS experiment is one of the multi-purpose experiments at the Large Hadron Collider (LHC) at CERN, constructed to study elementary particle interactions in collisions of high-energy proton beams. Twelve different sub detectors as well as the common experimental infrastructure are controlled and monitored by the Detector Control System (DCS) using a highly distributed system of 140 server machines running the industrial SCADA product PVSS. Higher level control system layers allow for automatic control procedures, efficient error recognition and handling, manage the communication with external systems such as the LHC controls, and provide a synchronization mechanism with the ATLAS data acquisition system. Different databases are used to store the online parameters of the experiment, replicate a subset used for physics reconstruction, and store the configuration parameters of the systems. This contribution describes the computing architecture and software tools to handle this complex and highly interconnected control system.

  20. A Remote Controlled Robotic Arm That Reads Barcodes and Handles Products

    Directory of Open Access Journals (Sweden)

    Zhi-Ying Chen

    2018-03-01

    Full Text Available In this study, a 6-axis robotic arm, which was controlled by an embedded Raspberry Pi with onboard WiFi, was developed and fabricated. A mobile application (APP, designed for the purpose, was used to operate and monitor a robotic arm by means of a WiFi connection. A computer vision was used to read common one-dimensional barcode (EAN code for the handling and identification of products such as milk tea drinks, sodas and biscuits. The gripper on the end of the arm could sense the clamping force and allowed real-time control of the amount of force used to hold and handle the products. The packages were all made of different material and this control allowed them to be handled without danger of damage or deformation. The maximum handling torque used was ~1.08 Nm and the mechanical design allowed the force of the gripper to be uniformly applied to the sensor to ensure accurate measurement of the force.

  1. Cable handling system for use in a nuclear reactor

    International Nuclear Information System (INIS)

    Crosgrove, R.O.; Larson, E.M.; Moody, E.

    1982-01-01

    A cable handling system for use in an installation such as a nuclear reactor is disclosed herein along with relevant portions of the reactor which, in a preferred embodiment, is a liquid metal fast breeder reactor. The cable handling system provides a specific way of interconnecting certain internal reactor components with certain external components, through an assembly of rotatable plugs. Moreover, this is done without having to disconnect these components from one another during rotation of the plugs and yet without interfering with other reactor components in the vicinity of the rotating plugs and cable handling system

  2. Advanced robotics handling and controls applied to Mixed Waste characterization, segregation and treatment

    International Nuclear Information System (INIS)

    Grasz, E.; Huber, L.; Horvath, J.; Roberson, P.; Wilhelmsen, K.; Ryon, R.

    1994-11-01

    At Lawrence Livermore National Laboratory under the Mixed Waste Operations program of the Department of Energy Robotic Technology Development Program (RTDP), a key emphasis is developing a total solution to the problem of characterizing, handling and treating complex and potentially unknown mixed waste objects. LLNL has been successful at looking at the problem from a system perspective and addressing some of the key issues including non-destructive evaluation of the waste stream prior to the materials entering the handling workcell, the level of automated material handling required for effective processing of the waste stream objects (both autonomous and tele-operational), and the required intelligent robotic control to carry out the characterization, segregation, and waste treating processes. These technologies were integrated and demonstrated in a prototypical surface decontamination workcell this past year

  3. Handling and safety enhancement of race cars using active aerodynamic systems

    Science.gov (United States)

    Diba, Fereydoon; Barari, Ahmad; Esmailzadeh, Ebrahim

    2014-09-01

    A methodology is presented in this work that employs the active inverted wings to enhance the road holding by increasing the downward force on the tyres. In the proposed active system, the angles of attack of the vehicle's wings are adjusted by using a real-time controller to increase the road holding and hence improve the vehicle handling. The handling of the race car and safety of the driver are two important concerns in the design of race cars. The handling of a vehicle depends on the dynamic capabilities of the vehicle and also the pneumatic tyres' limitations. The vehicle side-slip angle, as a measure of the vehicle dynamic safety, should be narrowed into an acceptable range. This paper demonstrates that active inverted wings can provide noteworthy dynamic capabilities and enhance the safety features of race cars. Detailed analytical study and formulations of the race car nonlinear model with the airfoils are presented. Computer simulations are carried out to evaluate the performance of the proposed active aerodynamic system.

  4. Physical load handling and listening comprehension effects on balance control.

    Science.gov (United States)

    Qu, Xingda

    2010-12-01

    The purpose of this study was to determine the physical load handling and listening comprehension effects on balance control. A total of 16 young and 16 elderly participants were recruited in this study. The physical load handling task required holding a 5-kg load in each hand with arms at sides. The listening comprehension task involved attentive listening to a short conversation. Three short questions were asked regarding the conversation right after the testing trial to test the participants' attentiveness during the experiment. Balance control was assessed by centre of pressure-based measures, which were calculated from the force platform data when the participants were quietly standing upright on a force platform. Results from this study showed that both physical load handling and listening comprehension adversely affected balance control. Physical load handling had a more deleterious effect on balance control under the listening comprehension condition vs. no-listening comprehension condition. Based on the findings from this study, interventions for the improvement of balance could be focused on avoiding exposures to physically demanding tasks and cognitively demanding tasks simultaneously. STATEMENT OF RELEVANCE: Findings from this study can aid in better understanding how humans maintain balance, especially when physical and cognitive loads are applied. Such information is useful for developing interventions to prevent fall incidents and injuries in occupational settings and daily activities.

  5. Manipulator and materials handling systems for reactor decommissioning -Cooperation between the university and the plant operator

    International Nuclear Information System (INIS)

    Schreck, G.; Bach, F. W.; Haferkamp, H.

    1995-01-01

    Nuclear reactor dismantling requires suitable handling systems for tools and disassembled components, as well as qualified and reliable disassembly and cutting techniques. From the angle of radiation protection, remote-controlled handling techniques and underwater techniques are the methods of choice, the latter particularly in continuation of plant operating conditions, and this all the more the more disassembly work proceeds towards the reactor core. With the experience accumulated for 20 years now by the Institut fuer Werkstoffkunde (materials science) of Hannover University by basic research and application-oriented development work in the field of thermal cutting technology, especially plasma arc cutting techniques, as well as development work in the field of remote-controlled materials handling systems, the institute is the cut-out partner for disassembly tasks in reactor decommissioning. (Orig./DG) [de

  6. Overview of the CANDU fuel handling system for advanced fuel cycles

    International Nuclear Information System (INIS)

    Koivisto, D.J.; Brown, D.R.

    1997-01-01

    Because of its neutron economies and on-power re-fuelling capabilities the CANDU system is ideally suited for implementing advanced fuel cycles because it can be adapted to burn these alternative fuels without major changes to the reactor. The fuel handling system is adaptable to implement advanced fuel cycles with some minor changes. Each individual advanced fuel cycle imposes some new set of special requirements on the fuel handling system that is different from the requirements usually encountered in handling the traditional natural uranium fuel. These changes are minor from an overall plant point of view but will require some interesting design and operating changes to the fuel handling system. Some preliminary conceptual design has been done on the fuel handling system in support of these fuel cycles. Some fuel handling details were studies in depth for some of the advanced fuel cycles. This paper provides an overview of the concepts and design challenges. (author)

  7. FY 1987 report on the result of the R and D of an automatic sewing system. Cloth handling technology; 1987 nendo jido hosei system no kenkyu kaihatsu seika hokokusho. Kiji handling gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-01

    The paper summarized the R and D of a cloth handling technology which is an element technology of an automatic sewing system by the Automatic Sewing System Technology Research Association. The cloth handling technology is divided into the following three: (1) cloth grasp technology; (2) high-functional positioning technology; (3) element technology of soft cloth conveying technology. In (1), development of the following was conducted: vertical grasp-type module, horizontal grasp-type module, cloth handling-type module, and auxiliary device. Prototypes of each were trially manufactured for experiment on the function confirmation. In (2), the following were conducted: development of experimental models of module handler and module controller for commercialization; study of visual/tactile sense composite multiple-arm cooperative movement control. In (3), in the studies having been made so far, specifications for an experimental model for joint sawing and specifications for the conveying system were studied, and experimental models of stock module and junction module were manufactured/tested/evaluated to study confirmation of function/performance. In this fiscal year, in the light of these results obtained, prototypes of each element device were developed. At the same time, the connection of these element devices made up an experimental model for joint sawing, and effectiveness of the element technology was confirmed in the system. (NEDO)

  8. Handling effluent from nuclear thermal propulsion system ground tests

    International Nuclear Information System (INIS)

    Shipers, L.R.; Allen, G.C.

    1992-01-01

    A variety of approaches for handling effluent from nuclear thermal propulsion system ground tests in an environmentally acceptable manner are discussed. The functional requirements of effluent treatment are defined and concept options are presented within the framework of these requirements. System concepts differ primarily in the choice of fission-product retention and waste handling concepts. The concept options considered range from closed cycle (venting the exhaust to a closed volume or recirculating the hydrogen in a closed loop) to open cycle (real time processing and venting of the effluent). This paper reviews the different methods to handle effluent from nuclear thermal propulsion system ground tests

  9. Localization of cask and plug remote handling system in ITER using multiple video cameras

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, João, E-mail: jftferreira@ipfn.ist.utl.pt [Instituto de Plasmas e Fusão Nuclear - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Vale, Alberto [Instituto de Plasmas e Fusão Nuclear - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Ribeiro, Isabel [Laboratório de Robótica e Sistemas em Engenharia e Ciência - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal)

    2013-10-15

    Highlights: ► Localization of cask and plug remote handling system with video cameras and markers. ► Video cameras already installed on the building for remote operators. ► Fiducial markers glued or painted on cask and plug remote handling system. ► Augmented reality contents on the video streaming as an aid for remote operators. ► Integration with other localization systems for enhanced robustness and precision. -- Abstract: The cask and plug remote handling system (CPRHS) provides the means for the remote transfer of in-vessel components and remote handling equipment between the Hot Cell building and the Tokamak building in ITER. Different CPRHS typologies will be autonomously guided following predefined trajectories. Therefore, the localization of any CPRHS in operation must be continuously known in real time to provide the feedback for the control system and also for the human supervision. This paper proposes a localization system that uses the video streaming captured by the multiple cameras already installed in the ITER scenario to estimate with precision the position and the orientation of any CPRHS. In addition, an augmented reality system can be implemented using the same video streaming and the libraries for the localization system. The proposed localization system was tested in a mock-up scenario with a scale 1:25 of the divertor level of Tokamak building.

  10. Localization of cask and plug remote handling system in ITER using multiple video cameras

    International Nuclear Information System (INIS)

    Ferreira, João; Vale, Alberto; Ribeiro, Isabel

    2013-01-01

    Highlights: ► Localization of cask and plug remote handling system with video cameras and markers. ► Video cameras already installed on the building for remote operators. ► Fiducial markers glued or painted on cask and plug remote handling system. ► Augmented reality contents on the video streaming as an aid for remote operators. ► Integration with other localization systems for enhanced robustness and precision. -- Abstract: The cask and plug remote handling system (CPRHS) provides the means for the remote transfer of in-vessel components and remote handling equipment between the Hot Cell building and the Tokamak building in ITER. Different CPRHS typologies will be autonomously guided following predefined trajectories. Therefore, the localization of any CPRHS in operation must be continuously known in real time to provide the feedback for the control system and also for the human supervision. This paper proposes a localization system that uses the video streaming captured by the multiple cameras already installed in the ITER scenario to estimate with precision the position and the orientation of any CPRHS. In addition, an augmented reality system can be implemented using the same video streaming and the libraries for the localization system. The proposed localization system was tested in a mock-up scenario with a scale 1:25 of the divertor level of Tokamak building

  11. The Glucose-Insulin Control System

    DEFF Research Database (Denmark)

    Hallgreen, Christine Erikstrup; Korsgaard, Thomas Vagn; Hansen, RenéNormann N.

    2008-01-01

    This chapter reviews the glucose-insulin control system. First, classic control theory is described briefly and compared with biological control. The following analysis of the control system falls into two parts: a glucose-sensing part and a glucose-controlling part. The complex metabolic pathways...... are divided into smaller pieces and analyzed via several small biosimulation models that describe events in beta cells, liver, muscle and adipose tissue etc. In the glucose-sensing part, the beta cell are shown to have some characteristics of a classic PID controller, but with nonlinear properties...... control, the analysis shows that the system has many more facets than just keeping the glucose concentration within narrow limits. After glucose enters the cell and is phosphorylated to glucose-6-phosphate, the handling of glucose-6-phosphate is critical for glucose regulation. Also, this handling...

  12. The design of in-cell crane handling systems for nuclear plants

    International Nuclear Information System (INIS)

    Hansford, S.M.; Scott, R.

    1992-01-01

    The reprocessing and waste management facilities at (BNFL's) British Nuclear Fuels Limited's Sellafield site make extensive use of crane handling systems. These range from conventional mechanical handling operations as used generally in industry to high integrity applications through to remote robotic handling operations in radiation environments. This paper describes the design methodologies developed for the design of crane systems for remote handling operations - in-cell crane systems. In most applications the in-cell crane systems are an integral part of the plant process equipment and reliable and safe operations are a key design parameter. Outlined are the techniques developed to achieve high levels of crane system availability for operations in hazardous radiation environments. These techniques are now well established and proven through many years of successful plant operation. A recent application of in-cell crane handling systems design for process duty application is described. The benefits of a systematic design approach and a functionally-based engineering organization are also highlighted. (author)

  13. Mockup of an automated material transport system for remote handling

    International Nuclear Information System (INIS)

    Porter, M.L.

    1992-01-01

    The automated material transport system (AMTS) was conceived for the transport of samples within the material and process control laboratory (MPCL), located in the plutonium processing building of the special isotope separation (SIS) facility. The MPCL was designed with a dry sample handling laboratory and a wet chemistry analysis laboratory. Each laboratory contained several processing glove boxes. The function of the AMTS was to automate the handling of materials, multiple process samples, and bulky items between process stations with a minimum of operator intervention and with a minimum of waiting periods and nonproductive activities. The AMTS design requirements, design verification mockup plan, and AMTS mockup procurement specification were established prior to cancellation of the SIS project. Due to the AMTS's flexibility, the need for technology development, and applicability to other US Department of Energy facilities, mockup of the AMTS continued. This paper discusses the system design features, capabilities, and results of initial testing

  14. A Perspective on Remote Handling Operations and Human Machine Interface for Remote Handling in Fusion

    International Nuclear Information System (INIS)

    Haist, B.; Hamilton, D.; Sanders, St.

    2006-01-01

    A large-scale fusion device presents many challenges to the remote handling operations team. This paper is based on unique operational experience at JET and gives a perspective on remote handling task development, logistics and resource management, as well as command, control and human-machine interface systems. Remote operations require an accurate perception of a dynamic environment, ideally providing the operators with the same unrestricted knowledge of the task scene as would be available if they were actually at the remote work location. Traditional camera based systems suffer from a limited number of viewpoints and also degrade quickly when exposed to high radiation. Virtual Reality and Augmented Reality software offer great assistance. The remote handling system required to maintain a tokamak requires a large number of different and complex pieces of equipment coordinating to perform a large array of tasks. The demands on the operator's skill in performing the tasks can escalate to a point where the efficiency and safety of operations are compromised. An operations guidance system designed to facilitate the planning, development, validation and execution of remote handling procedures is essential. Automatic planning of motion trajectories of remote handling equipment and the remote transfer of heavy loads will be routine and need to be reliable. This paper discusses the solutions developed at JET in these areas and also the trends in management and presentation of operational data as well as command, control and HMI technology development offering the potential to greatly assist remote handling in future fusion machines. (author)

  15. Progress in the design of the ITER Neutral Beam cell Remote Handling System

    Energy Technology Data Exchange (ETDEWEB)

    Shuff, R., E-mail: robin.shuff@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Van Uffelen, M.; Damiani, C. [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Tesini, A.; Choi, C.-H. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul-lez-Durance (France); Meek, R. [Oxford Technologies Limited, 7 Nuffield Way, Abingdon OX14 1RL (United Kingdom)

    2014-10-15

    The ITER Neutral Beam cell will include a suite of Remote Handling equipment for maintenance tasks. This paper summarises the current status and recent developments in the design of the ITER Neutral Beam Remote Handling System. Its concept design was successfully completed in July 2012 by CCFE in the frame of a grant agreement with F4E, in collaboration with the ITER Organisation, including major systems like monorail crane, Beam Line Transporter, beam source equipment, upper port and neutron shield equipment and associated tooling. Research and development activities are now underway on the monorail crane radiation hardened on-board control system and first of a kind remote pipe and lip seal maintenance tooling for the beam line vessel, reported in this paper.

  16. Progress in the design of the ITER Neutral Beam cell Remote Handling System

    International Nuclear Information System (INIS)

    Shuff, R.; Van Uffelen, M.; Damiani, C.; Tesini, A.; Choi, C.-H.; Meek, R.

    2014-01-01

    The ITER Neutral Beam cell will include a suite of Remote Handling equipment for maintenance tasks. This paper summarises the current status and recent developments in the design of the ITER Neutral Beam Remote Handling System. Its concept design was successfully completed in July 2012 by CCFE in the frame of a grant agreement with F4E, in collaboration with the ITER Organisation, including major systems like monorail crane, Beam Line Transporter, beam source equipment, upper port and neutron shield equipment and associated tooling. Research and development activities are now underway on the monorail crane radiation hardened on-board control system and first of a kind remote pipe and lip seal maintenance tooling for the beam line vessel, reported in this paper

  17. Data-handling system for the Fly's Eye experiment

    International Nuclear Information System (INIS)

    Bergeson, H.E.; Cassiday, G.L.; Cooper, D.A.

    1975-01-01

    The Fly's Eye air scintillation experiment presents severe data-handling requirements for two reasons. First, nearly 1,000 photomultipliers each produce outputs at rates from 100 Khz to 20 Mhz. Second, much of the signal arrives before a trigger is formed. A data handling system which will deal with this problem is described. (orig.) [de

  18. Overhead remote handling systems for the process facility modifications project

    International Nuclear Information System (INIS)

    Wiesener, R.W.; Grover, D.L.

    1987-01-01

    Each of the cells in the process facility modifications (PFM) project complex is provided with a variety of general purpose remote handling equipment including bridge cranes, monorail hoist, bridge-mounted electromechanical manipulator (EMM) and an overhead robot used for high efficiency particulate air (HEPA) filter changeout. This equipment supplements master-slave manipulators (MSMs) located throughout the complex to provide an overall remote handling system capability. The overhead handling equipment is used for fuel and waste material handling operations throughout the process cells. The system also provides the capability for remote replacement of all in-cell process equipment which may fail or be replaced for upgrading during the lifetime of the facility

  19. Ontario Hydro Pickering Generating Station fuel handling system performance

    International Nuclear Information System (INIS)

    Underhill, H.J.

    1986-01-01

    The report briefly describes the Pickering Nuclear Generating Station (PNGS) on-power fuel handling system and refuelling cycle. Lifetime performance parameters of the fuelling system are presented, including station incapability charged to the fuel handling system, cost of operating and maintenance, dose expenditure, events causing system unavailability, maintenance and refuelling strategy. It is concluded that the 'CANDU' on-power fuelling system, by consistently contributing less than 1% to the PNGS incapability, has been credited with a 6 to 20% increase in reactor capacity factor, compared to off-power fuelling schemes. (author)

  20. A review on bicycle and motorcycle rider control with a perspective on handling qualities

    Science.gov (United States)

    Kooijman, J. D. G.; Schwab, A. L.

    2013-11-01

    This paper is a review study on handling and control of bicycles and motorcycles, the so-called single-track vehicles. The first part gives a brief overview on the modelling of the dynamics of single-track vehicles and the experimental validation. The second part focusses on a review of modelling and measuring human rider control. The third part deals with the concepts of handling and manoeuvrability and their experimental validation. Parallels are drawn with the literature on aircraft handling and pilot models. The paper concludes with the open ends and promising directions for future work in the field of handling and control of single-track vehicles.

  1. The remote handling systems for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Isabel, E-mail: mir@isr.ist.utl.pt [Institute for Systems and Robotics/Instituto Superior Tecnico, Lisboa (Portugal); Damiani, Carlo [Fusion for Energy, Barcelona (Spain); Tesini, Alessandro [ITER Organization, Cadarache (France); Kakudate, Satoshi [ITER Tokamak Device Group, Japan Atomic Energy Agency, Ibaraki (Japan); Siuko, Mikko [VTT Systems Engineering, Tampere (Finland); Neri, Carlo [Associazione EURATOM ENEA, Frascati (Italy)

    2011-10-15

    The ITER remote handling (RH) maintenance system is a key component in ITER operation both for scheduled maintenance and for unexpected situations. It is a complex collection and integration of numerous systems, each one at its turn being the integration of diverse technologies into a coherent, space constrained, nuclearised design. This paper presents an integrated view and recent results related to the Blanket RH System, the Divertor RH System, the Transfer Cask System (TCS), the In-Vessel Viewing System, the Neutral Beam Cell RH System, the Hot Cell RH and the Multi-Purpose Deployment System.

  2. Cellular Manufacturing System with Dynamic Lot Size Material Handling

    Science.gov (United States)

    Khannan, M. S. A.; Maruf, A.; Wangsaputra, R.; Sutrisno, S.; Wibawa, T.

    2016-02-01

    Material Handling take as important role in Cellular Manufacturing System (CMS) design. In several study at CMS design material handling was assumed per pieces or with constant lot size. In real industrial practice, lot size may change during rolling period to cope with demand changes. This study develops CMS Model with Dynamic Lot Size Material Handling. Integer Linear Programming is used to solve the problem. Objective function of this model is minimizing total expected cost consisting machinery depreciation cost, operating costs, inter-cell material handling cost, intra-cell material handling cost, machine relocation costs, setup costs, and production planning cost. This model determines optimum cell formation and optimum lot size. Numerical examples are elaborated in the paper to ilustrate the characterictic of the model.

  3. Quinone-induced protein handling changes: Implications for major protein handling systems in quinone-mediated toxicity

    International Nuclear Information System (INIS)

    Xiong, Rui; Siegel, David; Ross, David

    2014-01-01

    Para-quinones such as 1,4-Benzoquinone (BQ) and menadione (MD) and ortho-quinones including the oxidation products of catecholamines, are derived from xenobiotics as well as endogenous molecules. The effects of quinones on major protein handling systems in cells; the 20/26S proteasome, the ER stress response, autophagy, chaperone proteins and aggresome formation, have not been investigated in a systematic manner. Both BQ and aminochrome (AC) inhibited proteasomal activity and activated the ER stress response and autophagy in rat dopaminergic N27 cells. AC also induced aggresome formation while MD had little effect on any protein handling systems in N27 cells. The effect of NQO1 on quinone induced protein handling changes and toxicity was examined using N27 cells stably transfected with NQO1 to generate an isogenic NQO1-overexpressing line. NQO1 protected against BQ–induced apoptosis but led to a potentiation of AC- and MD-induced apoptosis. Modulation of quinone-induced apoptosis in N27 and NQO1-overexpressing cells correlated only with changes in the ER stress response and not with changes in other protein handling systems. These data suggested that NQO1 modulated the ER stress response to potentiate toxicity of AC and MD, but protected against BQ toxicity. We further demonstrated that NQO1 mediated reduction to unstable hydroquinones and subsequent redox cycling was important for the activation of the ER stress response and toxicity for both AC and MD. In summary, our data demonstrate that quinone-specific changes in protein handling are evident in N27 cells and the induction of the ER stress response is associated with quinone-mediated toxicity. - Highlights: • Unstable hydroquinones contributed to quinone-induced ER stress and toxicity

  4. Quinone-induced protein handling changes: Implications for major protein handling systems in quinone-mediated toxicity

    Energy Technology Data Exchange (ETDEWEB)

    Xiong, Rui; Siegel, David; Ross, David, E-mail: david.ross@ucdenver.edu

    2014-10-15

    Para-quinones such as 1,4-Benzoquinone (BQ) and menadione (MD) and ortho-quinones including the oxidation products of catecholamines, are derived from xenobiotics as well as endogenous molecules. The effects of quinones on major protein handling systems in cells; the 20/26S proteasome, the ER stress response, autophagy, chaperone proteins and aggresome formation, have not been investigated in a systematic manner. Both BQ and aminochrome (AC) inhibited proteasomal activity and activated the ER stress response and autophagy in rat dopaminergic N27 cells. AC also induced aggresome formation while MD had little effect on any protein handling systems in N27 cells. The effect of NQO1 on quinone induced protein handling changes and toxicity was examined using N27 cells stably transfected with NQO1 to generate an isogenic NQO1-overexpressing line. NQO1 protected against BQ–induced apoptosis but led to a potentiation of AC- and MD-induced apoptosis. Modulation of quinone-induced apoptosis in N27 and NQO1-overexpressing cells correlated only with changes in the ER stress response and not with changes in other protein handling systems. These data suggested that NQO1 modulated the ER stress response to potentiate toxicity of AC and MD, but protected against BQ toxicity. We further demonstrated that NQO1 mediated reduction to unstable hydroquinones and subsequent redox cycling was important for the activation of the ER stress response and toxicity for both AC and MD. In summary, our data demonstrate that quinone-specific changes in protein handling are evident in N27 cells and the induction of the ER stress response is associated with quinone-mediated toxicity. - Highlights: • Unstable hydroquinones contributed to quinone-induced ER stress and toxicity.

  5. EBR-II fuel handling console digital upgrade

    International Nuclear Information System (INIS)

    Peters, G.G.; Wiege, D.D.; Christensen, L.J.

    1995-01-01

    The main fuel handling console and control system at the Experimental Breeder Reactor II (EBR-II) are being upgraded to a computerized system using high-end workstations for the operator interface and a programmable logic controller (PLC) for the control system. Two-dimensional (2D) and three-dimensional (3D) computer graphics will be provided for the operator which will show the relative position of under-sodium fuel handling equipment. This equipment is operated remotely with no means of directly viewing the transfer. This paper describes various aspects of the modification including reasons for the upgrade, capabilities the new system provides over the old control system, philosophies and rationale behind the new design, testing and simulation work, diagnostic features, and the advanced graphics techniques used to display information to the operator

  6. Bacterial foraging-optimized PID control of a two-wheeled machine with a two-directional handling mechanism.

    Science.gov (United States)

    Goher, K M; Fadlallah, S O

    2017-01-01

    This paper presents the performance of utilizing a bacterial foraging optimization algorithm on a PID control scheme for controlling a five DOF two-wheeled robotic machine with two-directional handling mechanism. The system under investigation provides solutions for industrial robotic applications that require a limited-space working environment. The system nonlinear mathematical model, derived using Lagrangian modeling approach, is simulated in MATLAB/Simulink ® environment. Bacterial foraging-optimized PID control with decoupled nature is designed and implemented. Various working scenarios with multiple initial conditions are used to test the robustness and the system performance. Simulation results revealed the effectiveness of the bacterial foraging-optimized PID control method in improving the system performance compared to the PID control scheme.

  7. Operation of data acquisition and handling system in the INS-SF cyclotron

    International Nuclear Information System (INIS)

    Yasue, M.; Omata, K.

    1976-01-01

    Operations of following data processing routines are described. 1) One-dimensional multiplexer PHA. 2) Two-dimensional multiplexer PHA. 3) Two or three parameter data handling: Digital gating, dumping of raw data onto MT and processing in function modes. These processing routines are executed under the control of a real time disk operating system in TOSBAC-40C. (auth.)

  8. A method for enabling real-time structural deformation in remote handling control system by utilizing offline simulation results and 3D model morphing

    International Nuclear Information System (INIS)

    Kiviranta, Sauli; Saarinen, Hannu; Maekinen, Harri; Krassi, Boris

    2011-01-01

    A full scale physical test facility, DTP2 (Divertor Test Platform 2) has been established in Finland for demonstrating and refining the Remote Handling (RH) equipment designs for ITER. The first prototype RH equipment at DTP2 is the Cassette Multifunctional Mover (CMM) equipped with Second Cassette End Effector (SCEE) delivered to DTP2 in October 2008. The purpose is to prove that CMM/SCEE prototype can be used successfully for the 2nd cassette RH operations. At the end of F4E grant 'DTP2 test facility operation and upgrade preparation', the RH operations of the 2nd cassette were successfully demonstrated to the representatives of Fusion For Energy (F4E). Due to its design, the CMM/SCEE robot has relatively large mechanical flexibilities when the robot carries the nine-ton-weighting 2nd Cassette on the 3.6-m long lever. This leads into a poor absolute accuracy and into the situation where the 3D model, which is used in the control system, does not reflect the actual deformed state of the CMM/SCEE robot. To improve the accuracy, the new method has been developed in order to handle the flexibilities within the control system's virtual environment. The effect of the load on the CMM/SCEE has been measured and minimized in the load compensation model, which is implemented in the control system software. The proposed method accounts for the structural deformations of the robot in the control system through the 3D model morphing by utilizing the finite element method (FEM) analysis for morph targets. This resulted in a considerable improvement of the CMM/SCEE absolute accuracy and the adequacy of the 3D model, which is crucially important in the RH applications, where the visual information of the controlled device in the surrounding environment is limited.

  9. Gas-handling system for studies of tritium-containing materials

    International Nuclear Information System (INIS)

    Carstens, D.H.W.

    1975-01-01

    A gas handling system for preparation and study of tritium containing compounds and materials is described. The system at any one time can handle amounts of DT gas up to about 3 moles and has provisions for purification, storage, and measurement of the gas. Experimental conditions covering the ranges 20 to 800 0 C and 0.1 Pa to 137 MPa (10 -2 torr to 20,000 psi) can be maintained. (auth)

  10. Duration on the exposure control, spectra storage and texture goniometer handling in the software complex for the accumulation, control and supervising systems at the NSHR and the SKAT spectrometers (Tofa and Goni tasks)

    International Nuclear Information System (INIS)

    Kirilov, A.S.; Korobchenko, M.L.; Sirotin, A.P.; Heinitz, J.

    1997-01-01

    The VME-based accumulation, control and supervising system has been maintained at the NSHR spectrometer since March 1995. Another copy of system has been in use at the newly created SKAT spectrometer since April 1997. This paper is devoted to a detailed description of the user interface for the Join and the Tofa tasks which are dedicated to controlling the duration of the exposure, the spectra storage and handling the texture goniometer at the spectrometers. (author)

  11. Development of a telerobotic system for handling contaminated process equipment

    International Nuclear Information System (INIS)

    Fisher, J.J.; Ward, C.R.; Schuler, T.F.

    1987-01-01

    E. I. du Pont de Nemours and Company is evaluating a unique eight-degree-of-freedom Telerobot manipulator to perform size-reduction and material handling operations on contaminated process equipment at the Savannah River Plant (SRP). The Telerobot will be installed in the proposed Transuranic (TRU) Waste Processing Facility, which is scheduled to be operational by 1990. A full-scale prototype Telerobot, manufactured by GCA Corporation, St. Paul, MN is being tested with other process equipment in the Components Test Facility at the Savannah River Laboratory (SRL). All telerobotic operations required in the TRU Waste Facility such as crate unpacking, equipment dismantling, material size-reduction, and selected maintenance operations are being tested. This paper discusses the major mechanical and control features of the Telerobot system. Several system enhancements were added by SRL, including a new quick-hand-change coupling and expanded software control functions. The new software enables a system operator to perform both teleoperated and automatic tasks through several operating modes. These enhancements, as well as future mechanical, control system, and software features, are reviewed

  12. Robust Sliding Mode Control of Air Handling Unit for Energy Efficiency Enhancement

    Directory of Open Access Journals (Sweden)

    Awais Shah

    2017-11-01

    Full Text Available In order to achieve feasible and copacetic low energy consuming building, a robust and efficient air conditioning system is necessary. Since heating ventilation and air conditioning systems are nonlinear and temperature and humidity are coupled, application of conventional control is inappropriate. A multi-input multi-output nonlinear model is presented. The temperature and humidity of thermal zone are ascendance by the manipulation of the water and air flow rates. A sliding mode controller (SMC is designed to ensure robust performance of air handling unit in the presence of uncertainties. A simple proportional-integral-derivative (PID controller is used as a comparison template to highlight the efficiency of the proposed controller. To accomplish tracking targets, a variety of desired temperature and relative humidity commands (including ramp and combination with sequence of steps are investigated. According to simulation results, SMC transcends the PID controller in terms of settling time, steady state and rise time, which makes SMC more energy efficient.

  13. Development of constrained motion control for robot handling of hazardous waste

    International Nuclear Information System (INIS)

    Starr, G.P.

    1993-01-01

    Handling and archiving of hazardous waste is an area where automation and robotics can be of significant benefit, by removing the human operator from the workplace and its associated hazards. For reasons of safety, throughput, and reduced setup time, force-controlled robots are well-suited for hazardous materials handling. The focus of this investigation is the development of advanced force control techniques for commercial industrial robots in the surface sampling of hazardous waste containers. Two particular control strategies are considered, (1) preview control, and (2) adaptive control. Preview control uses a sensor which can ''look ahead'' and thereby reduce the effect of surface irregularity on contact force control. Adaptive control allows the robot controller to compensate for changes in the robot characteristics as it changes position, and likewise improves performance. The resulting control algorithms will be applied to a two-dimensional contour-following task using a PUMA robot at the Robotics Research Laboratory at The University of New Mexico. (author) 9 figs., 13 refs

  14. Progress in the conceptual design of the ITER cask and plug remote handling system

    Energy Technology Data Exchange (ETDEWEB)

    Locke, Darren, E-mail: darren.locke@f4e.europa.eu [Fusion for Energy Agency (F4E), Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); González Gutiérrez, Carmen; Damiani, Carlo [Fusion for Energy Agency (F4E), Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Friconneau, Jean-Pierre; Martins, Jean-Pierre [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2014-10-15

    Highlights: • The CPRHS is a complex system with a significant number of complicated interfaces. • Significant effort is being made to ensure that the system requirements are clearly defined. • This solution relates to planned operations and also anticipation of rescue operations. • With the CPRHS performing a safety function process control is being put in place. • All these factors will have a significant impact on the success of the CPRHS. - Abstract: One function of the ITER remote maintenance system is the transportation of in-vessel components and remote handling systems to and from the vacuum vessel and docking stations in the Hot Cell via dedicated galleries and lift. The cask and plug remote handling system (CPRHS) has been adopted as the solution to provide this nuclear confinement and transportation. This paper discusses the development of the conceptual design to-date and presents the processes being implemented to effectively control the subsequent CPRHS development. The CPRHS is a complex suite of systems with a significant number of interfaces with other ITER systems. Significant effort is being made to ensure that the system requirements are comprehensively defined and carefully managed and a feasible solution is developed – including planned and rescue operations. With the CPRHS performing a critical confinement function appropriate processes are being put in place to control the system development of the CPRHS. The expectation is that the combination of these factors will have a significant impact on the successful implementation of the CPRHS.

  15. Progress in the conceptual design of the ITER cask and plug remote handling system

    International Nuclear Information System (INIS)

    Locke, Darren; González Gutiérrez, Carmen; Damiani, Carlo; Friconneau, Jean-Pierre; Martins, Jean-Pierre

    2014-01-01

    Highlights: • The CPRHS is a complex system with a significant number of complicated interfaces. • Significant effort is being made to ensure that the system requirements are clearly defined. • This solution relates to planned operations and also anticipation of rescue operations. • With the CPRHS performing a safety function process control is being put in place. • All these factors will have a significant impact on the success of the CPRHS. - Abstract: One function of the ITER remote maintenance system is the transportation of in-vessel components and remote handling systems to and from the vacuum vessel and docking stations in the Hot Cell via dedicated galleries and lift. The cask and plug remote handling system (CPRHS) has been adopted as the solution to provide this nuclear confinement and transportation. This paper discusses the development of the conceptual design to-date and presents the processes being implemented to effectively control the subsequent CPRHS development. The CPRHS is a complex suite of systems with a significant number of interfaces with other ITER systems. Significant effort is being made to ensure that the system requirements are comprehensively defined and carefully managed and a feasible solution is developed – including planned and rescue operations. With the CPRHS performing a critical confinement function appropriate processes are being put in place to control the system development of the CPRHS. The expectation is that the combination of these factors will have a significant impact on the successful implementation of the CPRHS

  16. National safeguards system operations at a bulk-handling facility

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    The presentation centers on the State System of Accounting and Control (SSAC) for bulk-handling facilities in the licenses sector of the US nuclear community. Details of those material control and accounting measures dealing with the national safeguards program are discussed in Session 6a. The concept and role of the Fundamental Nuclear Material Control (FNMC) Plan are discussed with the participants. In Session 6b, the lecture focusses on the international safeguards program of the US SSAC. The relationship of the national and international requirements is discussed as they relate to the IAEA INFCIRC/153 document. The purpose of this session is to enable participants to: (1) understand the basic MC and A elements in an SSAC; (2) understand which MC and A elements serve the country's national interests and those that serve IAEA safeguards

  17. KNOWLEDGE-BASED ROBOT VISION SYSTEM FOR AUTOMATED PART HANDLING

    Directory of Open Access Journals (Sweden)

    J. Wang

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: This paper discusses an algorithm incorporating a knowledge-based vision system into an industrial robot system for handling parts intelligently. A continuous fuzzy controller was employed to extract boundary information in a computationally efficient way. The developed algorithm for on-line part recognition using fuzzy logic is shown to be an effective solution to extract the geometric features of objects. The proposed edge vector representation method provides enough geometric information and facilitates the object geometric reconstruction for gripping planning. Furthermore, a part-handling model was created by extracting the grasp features from the geometric features.

    AFRIKAANSE OPSOMMING: Hierdie artikel beskryf ‘n kennis-gebaseerde visiesisteemalgoritme wat in ’n industriёle robotsisteem ingesluit word om sodoende intelligente komponenthantering te bewerkstellig. ’n Kontinue wasige beheerder is gebruik om allerlei objekinligting deur middel van ’n effektiewe berekeningsmetode te bepaal. Die ontwikkelde algoritme vir aan-lyn komponentherkenning maak gebruik van wasige logika en word bewys as ’n effektiewe metode om geometriese inligting van objekte te bepaal. Die voorgestelde grensvektormetode verskaf voldoende inligting en maak geometriese rekonstruksie van die objek moontlik om greepbeplanning te kan doen. Voorts is ’n komponenthanteringsmodel ontwikkel deur die grypkenmerke af te lei uit die geometriese eienskappe.

  18. SLSF loop handling system. Volume I. Structural analysis

    International Nuclear Information System (INIS)

    Ahmed, H.; Cowie, A.; Ma, D.

    1978-10-01

    SLSF loop handling system was analyzed for deadweight and postulated dynamic loading conditions, identified in Chapters II and III in Volume I of this report, using a linear elastic static equivalent method of stress analysis. Stress analysis of the loop handling machine is presented in Volume I of this report. Chapter VII in Volume I of this report is a contribution by EG and G Co., who performed the work under ANL supervision

  19. Generic device controller for accelerator control systems

    International Nuclear Information System (INIS)

    Mariotti, R.; Buxton, W.; Frankel, R.; Hoff, L.

    1987-01-01

    A new distributed intelligence control system has become operational at the AGS for transport, injection, and acceleration of heavy ions. A brief description of the functionality of the physical devices making up the system is given. An attempt has been made to integrate the devices for accelerator specific interfacing into a standard microprocessor system, namely, the Universal Device Controller (UDC). The main goals for such a generic device controller are to provide: local computing power; flexibility to configure; and real time event handling. The UDC assemblies and software are described

  20. Incorporating Handling Qualities Analysis into Rotorcraft Conceptual Design

    Science.gov (United States)

    Lawrence, Ben

    2014-01-01

    This paper describes the initial development of a framework to incorporate handling qualities analyses into a rotorcraft conceptual design process. In particular, the paper describes how rotorcraft conceptual design level data can be used to generate flight dynamics models for handling qualities analyses. Also, methods are described that couple a basic stability augmentation system to the rotorcraft flight dynamics model to extend analysis to beyond that of the bare airframe. A methodology for calculating the handling qualities characteristics of the flight dynamics models and for comparing the results to ADS-33E criteria is described. Preliminary results from the application of the handling qualities analysis for variations in key rotorcraft design parameters of main rotor radius, blade chord, hub stiffness and flap moment of inertia are shown. Varying relationships, with counteracting trends for different handling qualities criteria and different flight speeds are exhibited, with the action of the control system playing a complex part in the outcomes. Overall, the paper demonstrates how a broad array of technical issues across flight dynamics stability and control, simulation and modeling, control law design and handling qualities testing and evaluation had to be confronted to implement even a moderately comprehensive handling qualities analysis of relatively low fidelity models. A key outstanding issue is to how to 'close the loop' with an overall design process, and options for the exploration of how to feedback handling qualities results to a conceptual design process are proposed for future work.

  1. Computer control of fuel handling activities at FFTF

    International Nuclear Information System (INIS)

    Romrell, D.M.

    1985-03-01

    The Fast Flux Test Facility near Richland, Washington, utilizes computer control for reactor refueling and other related core component handling and processing tasks. The computer controlled tasks described in this paper include core component transfers within the reactor vessel, core component transfers into and out of the reactor vessel, remote duct measurements of irradiated core components, remote duct cutting, and finally, transferring irradiated components out of the reactor containment building for off-site shipments or to long term storage. 3 refs., 16 figs

  2. Report on achievements of research and development of an automatic sewing system in fiscal 1986. Cloth handling technology; 1986 nendo jido hosei system no kenkyu kaihatsu seika hokokusho. Kiji handling gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    The Automatic Sewing System Technology Research Association was commissioned from the Agency of Industrial Science and Technology on the 'development of an automatic sewing system'. The association has performed the research and development by dividing the subject into such component technologies as a total system and sewing preparation and processing technology, a sewing and assembling technology, a cloth handling technology, and a system management and control technology. This paper reports the achievement of the research on the cloth handling technology. This technology may be divided into such component technologies as (1) the cloth holding technology, (2) the high-functional positioning technology, and (3) the soft cloth moving technology. For the technology (1), development was made on the principle models, such as the vertical holding and parallel holding type modules and the cloth operating type module, as well as on the principle model for an auxiliary equipment for holding cloth edges. For the technology (2), development was made on the handler, controller, and coordinated operation control and teaching system. Discussions were given on optimal device configuration, functions required in the devices, and evaluation methods, as the high-functional positioning technology for the sewing process and pressing process. Prototype devices were designed and fabricated. For the technology (3), prototype models of the improved version were fabricated for the stock module and confluence model, their functions and performances were confirmed, and problems and points requiring improvement were extracted for prototype fabrication. (NEDO)

  3. Report on achievements of research and development of an automatic sewing system in fiscal 1986. Cloth handling technology; 1986 nendo jido hosei system no kenkyu kaihatsu seika hokokusho. Kiji handling gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    The Automatic Sewing System Technology Research Association was commissioned from the Agency of Industrial Science and Technology on the 'development of an automatic sewing system'. The association has performed the research and development by dividing the subject into such component technologies as a total system and sewing preparation and processing technology, a sewing and assembling technology, a cloth handling technology, and a system management and control technology. This paper reports the achievement of the research on the cloth handling technology. This technology may be divided into such component technologies as (1) the cloth holding technology, (2) the high-functional positioning technology, and (3) the soft cloth moving technology. For the technology (1), development was made on the principle models, such as the vertical holding and parallel holding type modules and the cloth operating type module, as well as on the principle model for an auxiliary equipment for holding cloth edges. For the technology (2), development was made on the handler, controller, and coordinated operation control and teaching system. Discussions were given on optimal device configuration, functions required in the devices, and evaluation methods, as the high-functional positioning technology for the sewing process and pressing process. Prototype devices were designed and fabricated. For the technology (3), prototype models of the improved version were fabricated for the stock module and confluence model, their functions and performances were confirmed, and problems and points requiring improvement were extracted for prototype fabrication. (NEDO)

  4. Handling system for nuclear fuel pellet inspection

    International Nuclear Information System (INIS)

    Nyman, D.H.; McLemore, D.R.; Sturges, R.H.

    1978-11-01

    HEDL is developing automated fabrication equipment for fast reactor fuel. A major inspection operation in the process is the gaging of fuel pellets. A key element in the system has been the development of a handling system that reliably moves pellets at the rate of three per second without product damage or excessive equipment wear

  5. CAMAC - A modular instrumentation system for data handling. Revised description and specification

    International Nuclear Information System (INIS)

    1977-03-01

    CAMAC is a modern data handling system in widespread use with on-line digital computers. It is based on a digital highway for data and control. The CAMAC specifications ensures compatibility between equipment from different sources. The revised specification introduces several new features, but is consistent with the previous version (EUR 4100e, 1969). The CAMAC system was specified by European laboratories, through the Esone Committee, and has been endorsed by the USAEC NIM Committee, who have an identical specification (TID-25875)

  6. Closed-system drug-transfer devices plus safe handling of hazardous drugs versus safe handling alone for reducing exposure to infusional hazardous drugs in healthcare staff.

    Science.gov (United States)

    Gurusamy, Kurinchi Selvan; Best, Lawrence Mj; Tanguay, Cynthia; Lennan, Elaine; Korva, Mika; Bussières, Jean-François

    2018-03-27

    Occupational exposure to hazardous drugs can decrease fertility and result in miscarriages, stillbirths, and cancers in healthcare staff. Several recommended practices aim to reduce this exposure, including protective clothing, gloves, and biological safety cabinets ('safe handling'). There is significant uncertainty as to whether using closed-system drug-transfer devices (CSTD) in addition to safe handling decreases the contamination and risk of staff exposure to infusional hazardous drugs compared to safe handling alone. To assess the effects of closed-system drug-transfer of infusional hazardous drugs plus safe handling versus safe handling alone for reducing staff exposure to infusional hazardous drugs and risk of staff contamination. We searched the Cochrane Central Register of Controlled Trials (CENTRAL), MEDLINE, Embase, OSH-UPDATE, CINAHL, Science Citation Index Expanded, economic evaluation databases, the World Health Organization International Clinical Trials Registry Platform, and ClinicalTrials.gov to October 2017. We included comparative studies of any study design (irrespective of language, blinding, or publication status) that compared CSTD plus safe handling versus safe handling alone for infusional hazardous drugs. Two review authors independently identified trials and extracted data. We calculated the risk ratio (RR) and mean difference (MD) with 95% confidence intervals (CI) using both fixed-effect and random-effects models. We assessed risk of bias according to the risk of bias in non-randomised studies of interventions (ROBINS-I) tool, used an intracluster correlation coefficient of 0.10, and we assessed the quality of the evidence using GRADE. We included 23 observational cluster studies (358 hospitals) in this review. We did not find any randomised controlled trials or formal economic evaluations. In 21 studies, the people who used the intervention (CSTD plus safe handling) and control (safe handling alone) were pharmacists or pharmacy

  7. Conceptual design of the handling and storage system for spent target vessel

    Energy Technology Data Exchange (ETDEWEB)

    Adachi, Junichi; Sasaki, Shinobu; Kaminaga, Masanori; Hino, Ryutaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2001-03-01

    A conceptual design of a handling and storage system for spent target vessels has been carried out, in order to establish spent target technology for the neutron scattering facility. The spent target vessels must be treated remotely with high reliability and safety, since they are highly activated and contain the poisonous mercury. The system is composed of a target exchange trolley to exchange the target vessel, remote handling equipment such as manipulators, airtight casks for the spent target vessel, storage pits and so on. This report presents the results of conceptual design study on a basic plan, a handling procedure, main devices and their arrangement of a handling and storage system for the spent target vessels. (author)

  8. Remote, under-sodium fuel handling experience at EBR-II

    International Nuclear Information System (INIS)

    King, R.W.; Planchon, H.P.

    1995-01-01

    The EBR-II is a pool-type design; the reactor fuel handling components and entire primary-sodium coolant system are submerged in the primary tank, which is 26 feet in diameter, 26 feet high, and contains 86,000 gallons of sodium. Since the reactor is submerged in sodium, fuel handling operations must be performed blind, making exact positioning and precision control of the fuel handling system components essential. EBR-II operated for 30 years, and the fuel handling system has performed approximately 25,000 fuel transfer operations in that time. Due to termination of the IFR program, EBR-II was shut down on September 30, 1994. In preparation for decommissioning, all fuel in the reactor will be transferred out of EBR-II to interim storage. This intensive fuel handling campaign will last approximately two years, and the number of transfers will be equivalent to the fuel handling done over about nine years of normal reactor operation. With this demand on the system, system reliability will be extremely important. Because of this increased demand, and considering that the system has been operating for about 32 years, system upgrades to increase reliability and efficiency are proceeding. Upgrades to the system to install new digital, solid state controls, and to take advantage of new visualization technology, are underway. Future reactor designs using liquid metal coolant will be able to incorporate imaging technology now being investigated, such as ultraviolet laser imaging and ultrasonic imaging

  9. Fuel handling system of Indian 500 MWe PHWR-evolution and innovations

    International Nuclear Information System (INIS)

    Sanatkumar, A.; Jit, I.; Muralidhar, G.

    1996-01-01

    India has gained rich experience in design, manufacture, testing, operation and maintenance of the Fuel Handling System of CANDU type PHWRs. When design and layout of the first 500 MWe PHWR was being evolved, it was possible for us to introduce many special and innovative features in the Fuel Handling System which are friendly for operations and maintenance personnel. Some of these are: Simple, robust and modular mechanisms for ease of maintenance; Shorter turnaround time for refuelling a channel by introduction of transit equipment between the Fuelling Machine (FM) Head and light water equipment; Optimised layout to transport spent fuel in straight and short path and also to facilitate direct wheeling out of the FM Head from the Reactor Building to the Service Building; Provision to operate the FM Head even when the Primary Heat Transport (PHT) System is open for maintenance; Control-console engineered for carrying out refuelling operations in the sitting position; and, Dedicated calibration and maintenance facility to facilitate quick replacement of the FM Head as a single unit. The above special features have been described in this paper. (author). 7 figs

  10. Fuel handling system of Indian 500 MWe PHWR-evolution and innovations

    Energy Technology Data Exchange (ETDEWEB)

    Sanatkumar, A; Jit, I; Muralidhar, G [Nuclear Power Corporation of India Ltd., Mumbai (India)

    1997-12-31

    India has gained rich experience in design, manufacture, testing, operation and maintenance of the Fuel Handling System of CANDU type PHWRs. When design and layout of the first 500 MWe PHWR was being evolved, it was possible for us to introduce many special and innovative features in the Fuel Handling System which are friendly for operations and maintenance personnel. Some of these are: Simple, robust and modular mechanisms for ease of maintenance; Shorter turnaround time for refuelling a channel by introduction of transit equipment between the Fuelling Machine (FM) Head and light water equipment; Optimised layout to transport spent fuel in straight and short path and also to facilitate direct wheeling out of the FM Head from the Reactor Building to the Service Building; Provision to operate the FM Head even when the Primary Heat Transport (PHT) System is open for maintenance; Control-console engineered for carrying out refuelling operations in the sitting position; and, Dedicated calibration and maintenance facility to facilitate quick replacement of the FM Head as a single unit. The above special features have been described in this paper. (author). 7 figs.

  11. Harvesting and handling agricultural residues for energy

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, B.M.; Summer, H.R.

    1986-05-01

    Significant progress in understanding the needs for design of agricultural residue collection and handling systems has been made but additional research is required. Recommendations are made for research to (a) integrate residue collection and handling systems into general agricultural practices through the development of multi-use equipment and total harvest systems; (b) improve methods for routine evaluation of agricultural residue resources, possibly through remote sensing and image processing; (c) analyze biomass properties to obtain detailed data relevant to engineering design and analysis; (d) evaluate long-term environmental, social, and agronomic impacts of residue collection; (e) develop improved equipment with higher capacities to reduce residue collection and handling costs, with emphasis on optimal design of complete systems including collection, transportation, processing, storage, and utilization; and (f) produce standard forms of biomass fuels or products to enhance material handling and expand biomass markets through improved reliability and automatic control of biomass conversion and other utilization systems. 118 references.

  12. FY 1983 annual report on the research and development of automatic sewing systems. Cloth handling techniques; 1983 nendo jido hosei system no kenkyu kaihatsu seika hokokusho. Kiji handling gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1984-03-01

    The automatic sewing system technique research association has been commissioned by the Agency of Industrial Science and Technology for (research and development of automatic sewing systems). This program covers R and D of the elementary techniques for total systems and sewing preparation/processing, sewing/assembling, cloth handling, and system management/control. This report describes the results of the R and D efforts for the cloth handling techniques. The program for the cloth holding techniques classifies the elementary works from cloth picking-up to completion of sewing, classifies the holding methods, and analyzes the holding functions, to establish the design guidelines for the holding device functions. The basic designs of a total of 9 holding modules and the holding module with a built-in sensor are drawn, evaluated and investigated. The program for the highly functional positioning techniques analyzes the current sewing/pressing works, and analyzes and systemizes the related elementary works, to establish the design guidelines for the light module handler functions. The program for the soft cloth transfer techniques analyzes the works and investigates the transfer-related factors for delivery of cloth within the process, to establish the design guidelines for the hardware configuration. (NEDO)

  13. Proposed master-slave and automated remote handling system for high-temperature gas-cooled reactor fuel refabrication

    International Nuclear Information System (INIS)

    Grundmann, J.G.

    1974-01-01

    The Oak Ridge National Laboratory's Thorium-Uranium Recycle Facility (TURF) will be used to develop High-Temperature Gas-Cooled Reactor (HTGR) fuel recycle technology which can be applied to future HTGR commercial fuel recycling plants. To achieve recycle capabilities it is necessary to develop an effective material handling system to remotely transport equipment and materials and to perform maintenance tasks within a hot cell facility. The TURF facility includes hot cells which contain remote material handling equipment. To extend the capabilities of this equipment, the development of a master-slave manipulator and a 3D-TV system is necessary. Additional work entails the development of computer controls to provide: automatic execution of tasks, automatic traverse of material handling equipment, automatic 3D-TV camera sighting, and computer monitoring of in-cell equipment positions to prevent accidental collisions. A prototype system which will be used in the development of the above capabilities is presented. (U.S.)

  14. Application of advanced remote systems technology to future waste handling facilities

    International Nuclear Information System (INIS)

    Kring, C.T.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has been advancing the technology of remote handling and remote maintenance for in-cell systems planned for future nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor is directly applicable to the proposed in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The application of teleoperated, force-reflecting servomanipulators with television viewing could be a major step forward in waste handling facility design. Primary emphasis in the current program is the operation of a prototype remote handling and maintenance system, the advanced servomanipulator (ASM), which specifically addresses the requirements of fuel reprocessing and waste handling with emphasis on force reflection, remote maintainability, reliability, radiation tolerance, and corrosion resistance. Concurrent with the evolution of dexterous manipulators, concepts have also been developed that provide guidance for standardization of the design of the remotely operated and maintained equipment, the interface between the maintenance tools and the equipment, and the interface between the in-cell components and the facility

  15. 20 CFR 658.401 - Types of complaints handled by the JS complaint system.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Types of complaints handled by the JS... § 658.401 Types of complaints handled by the JS complaint system. (a)(1) The types of complaints (JS related complaints) which shall be handled to resolution by the JS complaint system are as follows: (i...

  16. A robust model predictive control strategy for improving the control performance of air-conditioning systems

    International Nuclear Information System (INIS)

    Huang Gongsheng; Wang Shengwei; Xu Xinhua

    2009-01-01

    This paper presents a robust model predictive control strategy for improving the supply air temperature control of air-handling units by dealing with the associated uncertainties and constraints directly. This strategy uses a first-order plus time-delay model with uncertain time-delay and system gain to describe air-conditioning process of an air-handling unit usually operating at various weather conditions. The uncertainties of the time-delay and system gain, which imply the nonlinearities and the variable dynamic characteristics, are formulated using an uncertainty polytope. Based on this uncertainty formulation, an offline LMI-based robust model predictive control algorithm is employed to design a robust controller for air-handling units which can guarantee a good robustness subject to uncertainties and constraints. The proposed robust strategy is evaluated in a dynamic simulation environment of a variable air volume air-conditioning system in various operation conditions by comparing with a conventional PI control strategy. The robustness analysis of both strategies under different weather conditions is also presented.

  17. Safety handling manual for high dose rate remote afterloading system

    International Nuclear Information System (INIS)

    1999-01-01

    This manual is mainly for safety handling of 192 Ir-RALS (remote afterloading system) of high dose rate and followings were presented: Procedure and document format for the RALS therapy and for handling of its radiation source with the purpose of prevention of human errors and unexpected accidents, Procedure for preventing errors occurring in the treatment schedule and operation, and Procedure and format necessary for newly introducing the system into a facility. Consistency was intended in the description with the quality assurance guideline for therapy with small sealed radiation sources made by JASTRO (Japan Society for Therapeutic Radiology and Oncology). Use of the old type 60 Co-RALS was pointed out to be a serious problem remained and its safety handling procedure was also presented. (K.H.)

  18. Multicriteria Gain Tuning for Rotorcraft Flight Controls (also entitled The Development of the Conduit Advanced Control System Design and Evaluation Interface with a Case Study Application Fly by Wire Helicopter Design)

    Science.gov (United States)

    Biezad, Daniel

    1997-01-01

    Handling qualities analysis and control law design would seem to be naturally complimenting components of aircraft flight control system design, however these two closely coupled disciplines are often not well integrated in practice. Handling qualities engineers and control system engineers may work in separate groups within an aircraft company. Flight control system engineers and handling quality specialists may come from different backgrounds and schooling and are often not aware of the other group's research. Thus while the handling qualities specifications represent desired aircraft response characteristics, these are rarely incorporated directly in the control system design process. Instead modem control system design techniques are based on servo-loop robustness specifications, and simple representations of the desired control response. Comprehensive handling qualities analysis is often left until the end of the design cycle and performed as a check of the completed design for satisfactory performance. This can lead to costly redesign or less than satisfactory aircraft handling qualities when the flight testing phase is reached. The desire to integrate the fields of handling qualities and flight,control systems led to the development of the CONDUIT system. This tool facilitates control system designs that achieve desired handling quality requirements and servo-loop specifications in a single design process. With CONDUIT, the control system engineer is now able to directly design and control systems to meet the complete handling specifications. CONDUIT allows the designer to retain a preferred control law structure, but then tunes the system parameters to meet the handling quality requirements.

  19. Multivariable robust control of an air-handling unit: A comparison between pole-placement and H∞ controllers

    International Nuclear Information System (INIS)

    Moradi, Hamed; Bakhtiari-Nejad, Firooz; Saffar-Avval, Majid

    2012-01-01

    Highlights: ► Robust control of a multivariable air-handling unit (AHU). ► Controllers designed based on pole-placement and μ-synthesis. ► Robust performance in the presence of model uncertainties. ► Achievement of various tracking objectives in temperature and relative humidity. ► Comfort conditions in buildings with low energy consumption and operation cost. - Abstract: Control of air-conditioner units is essential to achieve satisfactory comfort conditions in buildings while keeping low energy consumption and operation costs. In this paper, a nonlinear multiinput and multioutput model (MIMO) of an air-handling unit (AHU) is considered. After linearization of the state equations around the operating points, an observer and a regulator are designed for the estimation of state variables and disturbance rejection, respectively. A realistic uncertain model is considered which constitutes various uncertainties associated with complex nonlinear model of AHU. In the presence of model uncertainties, a H ∞ -robust controller is designed to guarantee robust performance of the air-handling unit. In addition, a simple controller based on pole-placement approach is developed. Indoor temperature and relative humidity are controlled via manipulation of valve positions of air and cold water flow rates. Achievement of tracking objectives is investigated through various desired commands of indoor temperature and relative humidity (including a sequence of steps and ramps-steps). According to results, the H ∞ -robust controller guarantees the robust performance of the AHU in tracking of desired set-paths (while using the simple pole-placement controller leads to high oscillatory behavior of the output variables and control efforts). Moreover, using H ∞ -robust controller results in less energy consumption in comparison with the pole-placement controller.

  20. CAD-model based remote handling control system for NET and JET

    International Nuclear Information System (INIS)

    Leinemann, K.; Kuehneapfel, U.; Ludwig, A.

    1989-01-01

    For maintenance work in fusion plants a supervisory control system concept was developed, which organized a close, problem-suited cooperation of man and machine, based on shared control and mutual help. The central module on the task control level of the control system is a real-time simulator based on a three-dimensional CAD-model. This simulator serves for planning and of-line programming of maintenance sequences, and, in th execution phase, for integrated viewing, combining TV and synthetic scene presentation. A first implementation of a geometric simulator and its integration in an overall control system was realized for JET. (author). 5 refs.; 7 figs

  1. Enbridge system : crude types, transportation and handling systems

    Energy Technology Data Exchange (ETDEWEB)

    Anand, A. [Enbridge Corp., Edmonton, AB (Canada)

    2009-07-01

    The supply of crude oil from the Western Canada Sedimentary Basin is expected to increase by approximately 2.1 million barrels per day by 2015. The crudes that Enbridge handles range from 19 API to 40 API and 0.1 per cent sulphur to 4.7 per cent sulphur. The diverse supply of crude oil that the Enbridge system handles includes conventional heavy, synthetic heavy, heavy high tan, heavy low residual, medium, light sour, heavy sour, light sweet, light sweet synthetic, condensate and olefinic crudes. This presentation discussed Enbridge's plans for infrastructure expansion, crude types and quality assurance program. The company's infrastructure plans include the expansion of regional pipelines to bring more supplies to the mainline; expansion of the mainline capacity to existing markets; and providing pipeline access to new markets. Merchant storage terminals will be provided in some locations. The quality of various crude types will be maintained through judicious sequencing and tank bottoms crossings. tabs., figs.

  2. Study on Adaptive Slid Mode Controller for Improving Handling Stability of Motorized Electric Vehicles

    Directory of Open Access Journals (Sweden)

    LiQiang Jin

    2014-01-01

    Full Text Available An adaptive slid mode controller was established for improving the handling stability of motorized electric vehicle (MEV. First and foremost, the structure and advantages of electric vehicle driven by in-wheel motors will be provided. Then, an ideal cornering model of vehicles will be brought and analyzed, after which a method to estimate side-slip angle was also proposed and three typical sensors were used in the theory. Besides, an idea for the recognition of road adhesion coefficient was derived based on MEV platform, which will be helpful for better control performances. Finally, the scheme of control method was given and some typical tests for observing handling properties were implemented based on Simulink and Carsim software. With the outcomes from the experiments, which vividly showed the merits of the controller, one can come to a conclusion that MEV that equips with the adaptive slid mode controller always enjoys better handling performances than the one without control. Furthermore, the controller researched is friendly to the real-time working conditions, which will hold practical values in the future.

  3. Transportation system (TRUPACT) for contact-handled transuranic wastes

    International Nuclear Information System (INIS)

    Romesberg, L.E.; Pope, R.B.; Burgoyne, R.M.

    1982-04-01

    Contact-handled transuranic defense waste is being, and will continue to be, moved between a number of locations in the United States. The DOE is sponsoring development of safe, efficient, licensable, and cost-effective transportation systems to handle this waste. The systems being developed have been named TRUPACT which stands for TRansUranic PACkage Transporter. The system will be compatible with Type A packagings used by waste generators, interim storage facilities, and repositories. TRUPACT is required to be a Type B packaging since larger than Type A quantities of some radionuclides (particularly plutonium) may be involved in the collection of Type A packagings. TRUPACT must provide structural and thermal protection to the waste in hypothetical accident environments specified in DOT regulations 49CFR173 and NRC regulations 10CFR71. Preliminary design of the systems has been completed and final design for a truck system is underway. The status of the development program is reviewed in this paper and the reference design is described. Tests that have been conducted are discussed and long-term program objectives are reviewed

  4. Preliminary definition of the remote handling system for the current IFMIF Test Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Queral, V., E-mail: vicentemanuel.queral@ciemat.es [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Urbon, J. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Instituto de Fusion Nuclear, Universidad Politecnica de Madrid, 28006 Madrid (Spain); Garcia, A.; Cuarental, I.; Mota, F. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Micciche, G. [CR ENEA Brasimone, I-40035 Camugnano (BO) (Italy); Ibarra, A. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Rapisarda, D. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Instituto de Fusion Nuclear, Universidad Politecnica de Madrid, 28006 Madrid (Spain); Casal, N. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain)

    2011-10-15

    A coherent design of the remote handling system with the design of the components to be manipulated is vital for reliable, safe and fast maintenance, having a decisive impact on availability, occupational exposures and operational cost of the facility. Highly activated components in the IFMIF facility are found at the Test Cell, a shielded pit where the samples are accurately located. The remote handling system for the Test Cell reference design was outlined in some past IFMIF studies. Currently a new preliminary design of the Test Cell in the IFMIF facility is being developed, introducing important modifications with respect to the reference one. This recent design separates the previous Vertical Test Assemblies in three functional components: Test Modules, shielding plugs and conduits. Therefore, it is necessary to adapt the previous design of the remote handling system to the new maintenance procedures and requirements. This paper summarises such modifications of the remote handling system, in particular the assessment of the feasibility of a modified commercial multirope crane for the handling of the weighty shielding plugs for the new Test Cell and a quasi-commercial grapple for the handling of the new Test Modules.

  5. Preliminary definition of the remote handling system for the current IFMIF Test Facilities

    International Nuclear Information System (INIS)

    Queral, V.; Urbon, J.; Garcia, A.; Cuarental, I.; Mota, F.; Micciche, G.; Ibarra, A.; Rapisarda, D.; Casal, N.

    2011-01-01

    A coherent design of the remote handling system with the design of the components to be manipulated is vital for reliable, safe and fast maintenance, having a decisive impact on availability, occupational exposures and operational cost of the facility. Highly activated components in the IFMIF facility are found at the Test Cell, a shielded pit where the samples are accurately located. The remote handling system for the Test Cell reference design was outlined in some past IFMIF studies. Currently a new preliminary design of the Test Cell in the IFMIF facility is being developed, introducing important modifications with respect to the reference one. This recent design separates the previous Vertical Test Assemblies in three functional components: Test Modules, shielding plugs and conduits. Therefore, it is necessary to adapt the previous design of the remote handling system to the new maintenance procedures and requirements. This paper summarises such modifications of the remote handling system, in particular the assessment of the feasibility of a modified commercial multirope crane for the handling of the weighty shielding plugs for the new Test Cell and a quasi-commercial grapple for the handling of the new Test Modules.

  6. Inert gas handling in ion plating systems

    International Nuclear Information System (INIS)

    Goode, A.R.; Burden, M.St.J.

    1979-01-01

    The results of an investigation into the best methods for production and monitoring of the inert gas environment for ion plating systems are reported. Work carried out on Pirani gauges and high pressure ion gauges for the measurement of pressures in the ion plating region (1 - 50mtorr) and the use of furnaces for cleaning argon is outlined. A schematic of a gas handling system is shown and discussed. (UK)

  7. Simulation Research on an Electric Vehicle Chassis System Based on a Collaborative Control System

    Directory of Open Access Journals (Sweden)

    Nenglian Feng

    2013-01-01

    Full Text Available This paper presents a collaborative control system for an electric vehicle chassis based on a centralized and hierarchical control architecture. The centralized controller was designed for the suspension and steering system, which is used for improving ride comfort and handling stability; the hierarchical controller was designed for the braking system, which is used for distributing the proportion of hydraulic braking and regenerative braking to improve braking performance. These two sub-controllers function at the same level of the vehicle chassis control system. In order to reduce the potential conflict between the two sub-controllers and realize a coordination optimization of electric vehicle performance, a collaborative controller was built, which serves as the upper controller to carry out an overall coordination analysis according to vehicle signals and revises the decisions of sub-controllers. A simulation experiment was carried out with the MATLAB/Simulink software. The simulation results show that the proposed collaborative control system can achieve an optimized vehicle handling stability and braking safety.

  8. Combined application of Product Lifecycle and Software Configuration Management systems for ITER remote handling

    International Nuclear Information System (INIS)

    Muhammad, Ali; Esque, Salvador; Aha, Liisa; Mattila, Jouni; Siuko, Mikko; Vilenius, Matti; Jaervenpaeae, Jorma; Irving, Mike; Damiani, Carlo; Semeraro, Luigi

    2009-01-01

    The advantages of Product Lifecycle Management (PLM) systems are widely understood among the industry and hence a PLM system is already in use by International Thermonuclear Experimental Reactor (ITER) Organization (IO). However, with the increasing involvement of software in the development, the role of Software Configuration Management (SCM) systems have become equally important. The SCM systems can be useful to meet the higher demands on Safety Engineering (SE), Quality Assurance (QA), Validation and Verification (V and V) and Requirements Management (RM) of the developed software tools. In an experimental environment, such as ITER, the new remote handling requirements emerge frequently. This means the development of new tools or the modification of existing tools and the development of new remote handling procedures or the modification of existing remote handling procedures. PLM and SCM systems together can be of great advantage in the development and maintenance of such remote handling system. In this paper, we discuss how PLM and SCM systems can be integrated together and play their role during the development and maintenance of ITER remote handling system. We discuss the possibility to investigate such setup at DTP2 (Divertor Test Platform 2), which is the full scale mock-up facility to verify the ITER divertor remote handling and maintenance concepts.

  9. Superphenix 1 primary handling system fabrication and testing

    International Nuclear Information System (INIS)

    Branchu, J.; Ebbinghaus, K.; Gigarel, C.

    1985-01-01

    Primary handling covers the operations performed for spent fuel removal, new fuel insertion, and the insodium storage outside the new or spent fuel vessel. This equipment typifies many of the difficulties encountered with the project as a whole: fabrication coordination when several countries are involved and design and construction of very large, relatively complex components. Detailed design studies were mainly influenced by thermal and seismic requirements, as applicable to sodium-immersed structures. Where possible, well-tried mechanical solutions were used, but widely differing techniques were involved, ranging from the high precision fabrication of structures and mechanisms comprising numerous component parts, implying complex machining operations. No particular problems were encountered during the sodium testing of the primary handling equipment. Trends for the 1500-MW (electric) breeder include investigation of the advisability of fuel storage in the core lattice and the possibility of handling system simplification

  10. The application of advanced remote systems technology to future waste handling facilities: Waste Systems Data and Development Program

    International Nuclear Information System (INIS)

    Kring, C.T.; Herndon, J.N.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at the Oak Ridge National Laboratory (ORNL) has been advancing the technology in remote handling and remote maintenance of in-cell systems planned for future US nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor are directly applicable to the in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The ORNL developments are based on the application of teleoperated force-reflecting servomanipulators controlled by an operator completely removed from the hazardous environment. These developments address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in a waste handling facility. Employing technological advancements in dexterous manipulators, as well as basic design guidelines that have been developed for remotely maintained equipment and processes, can increase operation and maintenance system capabilities, thereby allowing the attainment of two FWMS major objectives: decreasing plant personnel radiation exposure and increasing plant availability by decreasing the mean-time-to-repair in-cell maintenance and process equipment. 5 refs., 7 figs

  11. SIMULASI GROUP TECHNOLOGY SYSTEM UNTUK MEMINIMALKAN BIAYA MATERIAL HANDLING DENGAN METODE HEURISTIC

    Directory of Open Access Journals (Sweden)

    Much. Djunaidi

    2006-04-01

    Full Text Available Group Technology System merupakan metode pengaturan fasilitas produksi (machine groups yang dibutuhkan untuk memproses suatu part family tertentu ke dalam sel-sel manufaktur. Pengaturan tata letak di CV. Sonytex yang berdasarkan process layout mengakibatkan perusahaan menghadapi permasalahan berupa tingginya kebutuhan material handling. Salah satu kriteria kinerja dalam pembentukan sel manufaktur pada GTS adalah meminimasi total jarak material handling, sehingga dapat mengurangi biaya material handling dan meningkatkan produktivitas. Dalam penelitian ini digunakan tiga metode, yaitu Bond Energy Algorithm (BEA, Rank Order Clustering (ROC dan Rank Order Clustering 2 (ROC2. Hasil dari penelitian ini adalah dengan menerapkan group technology systems diperoleh total pengurangan jarak material handling sebesar 70 m dan penghematan biaya material handling sebesar Rp 1.534.978,-. Berdasarkan model simulasi, relayout dengan metode BEA meningkatkan jumlah produksi sebesar 1 unit produk/hari dan penurunan waktu tunggu sebesar 0,575 menit.

  12. Design and analysis of an intelligent controller for active geometry suspension systems

    Science.gov (United States)

    Goodarzi, Avesta; Oloomi, Ehsan; Esmailzadeh, Ebrahim

    2011-02-01

    An active geometry suspension (AGS) system is a device to optimise suspension-related factors such as toe angle and roll centre height by controlling vehicle's suspension geometry. The suspension geometry could be changed through control of suspension mounting point's position. In this paper, analysis and control of an AGS system is addressed. First, the effects of suspension geometry change on roll centre height and toe angle are studied. Then, based on an analytical approach, the improvement of the vehicle's stability and handling due to the control of suspension geometry is investigated. In the next section, an eight-degree-of-freedom handling model of a sport utility vehicle equipped with an AGS system is introduced. Finally, a self-tuning proportional-integral controller has been designed, using the fuzzy control theory, to control the actuator that changes the geometry of the suspension system. The simulation results show that an AGS system can improve the handling and stability of the vehicle.

  13. 78 FR 41993 - Transport Handling Specialists, Inc.-Continuance in Control Exemption-RSL Railroad, LLC

    Science.gov (United States)

    2013-07-12

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35726] Transport Handling Specialists, Inc.--Continuance in Control Exemption--RSL Railroad, LLC Transport Handling Specialists, Inc. (THS), has filed a verified notice of exemption (Notice) under 49 CFR 1180.2(d)(2) to continue in...

  14. Control of the outlet air temperature in an air handling unit

    DEFF Research Database (Denmark)

    Brath, P.; Rasmussen, Henrik; Hägglund, T.

    1998-01-01

    This paper discuss modeling and control of the inlet temperature in an Air Handling Unit, AHU. The model is based on step response experiments made at a full scale test plant. We use gain scheduling to lower the correlation of the air flow with the process dynamic which simplify the control task...

  15. Model-Based Control for Postal Automation and Baggage Handling

    NARCIS (Netherlands)

    Tarau, A.N.

    2010-01-01

    In this thesis we focus on two specific transportation systems, namely postal automation and baggage handling. Postal automation: During the last decades the volume of magazines, catalogs, and other plastic wrapped mail items that have to be processed by post sorting centers has increased

  16. Mock-up test on key components of ITER blanket remote handling system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Matsumoto, Yasuhiro; Taguchi, Koh; Kozaka, Hiroshi; Shibanuma, Kiyoshi; Tesini, Alessandro

    2009-01-01

    The maintenance operation of the ITER in-vessel component, such as a blanket and divertor, must be executed by the remote equipment because of the high gamma-ray environment. During the Engineering Design Activity (EDA), the Japan Atomic Energy Agency (then called as Japan Atomic Energy Research Institute) had been fabricated the prototype of the vehicle manipulator system for the blanket remote handling and confirmed feasibility of this system including automatic positioning of the blanket and rail deployment procedure of the articulated rail. The ITER agreement, which entered into force in the last year, formally decided that Japan will procure the blanket remote handling system and the JAEA, as the Japanese Domestic Agency, is continuing several R and Ds so that the system can be procured smoothly. The residual key issues after the EDA are rail connection and cable handling. The mock-ups of the rail connection mechanism and the cable handling system were fabricated from the last year and installed at the JAEA Naka Site in this March. The former was composed of the rail connecting mechanism, two rail segments and their handling systems. The latter one utilized a slip ring, which implemented 80 lines for power and 208 lines for signal, because there is an electrical contact between the rotating spool and the fixed base. The basic function of these systems was confirmed through the mock-up test. The rail connection mechanism, for example, could accept misalignment of 1.5-2 mm at least. The future test plan is also mentioned in the paper.

  17. Nonlinear Predictive Sliding Mode Control for Active Suspension System

    Directory of Open Access Journals (Sweden)

    Dazhuang Wang

    2018-01-01

    Full Text Available An active suspension system is important in meeting the requirements of the ride comfort and handling stability for vehicles. In this work, a nonlinear model of active suspension system and a corresponding nonlinear robust predictive sliding mode control are established for the control problem of active suspension. Firstly, a seven-degree-of-freedom active suspension model is established considering the nonlinear effects of springs and dampers; and secondly, the dynamic model is expanded in the time domain, and the corresponding predictive sliding mode control is established. The uncertainties in the controller are approximated by the fuzzy logic system, and the adaptive controller reduces the approximation error to increase the robustness of the control system. Finally, the simulation results show that the ride comfort and handling stability performance of the active suspension system is better than that of the passive suspension system and the Skyhook active suspension. Thus, the system can obviously improve the shock absorption performance of vehicles.

  18. Stability of Closed Loop Controlled Repetitive Periodic System applied to control of CD-Player

    DEFF Research Database (Denmark)

    Odgaard, Peter Fogh; Stoustrup, Jakob; Andersen, Palle

    2005-01-01

    In this paper a criterion for stability of specific control scheme for handling linear dynamic control systems with repetitive periodic sensor faults is derived. The given system and control scheme are described and defined. By combining these with the lifting technique a necessary and sufficient...

  19. GLCTA control system

    International Nuclear Information System (INIS)

    Terunuma, N.; Hayano, H.; Higo, T.; Saeki, T.; Suehara, T.; Watanabe, K.

    2004-01-01

    Research and development for the high power X-band RF technologies have been performed on the GLC Test Accelerator, GLCTA, since fall of 2003. The control system of this facility is based on the PC-Linux servers that handle the CAMAC, VME and PLC modules. Automated RF processing and data accumulation of the RF breakdown have been performed. (author)

  20. JOYO operation support system 'JOYCAT' based on intelligent alarm handling

    International Nuclear Information System (INIS)

    Tamaoki, Tetsuo; Yamamoto, Hiroki; Sato, Masuo; Yoshida, Megumu; Kaneko, Tomoko; Terunuma, Seiichi; Takatsuto, Hiroshi; Morimoto, Makoto.

    1992-01-01

    An operation support system for the experimental fast reactor 'JOYO' was developed based on an intelligent alarm-handling. A specific feature of this system, called JOYCAT (JOYO Consulting and Analyzing Tool), is in its sequential processing structure that a uniform treatment by using design knowledge base is firstly applied for all activated alarms, and an exceptional treatment by using heuristic knowledge base is then applied only for the former results. This enables us to achieve real-time and flexible alarm-handling. The first alarm-handling determines the candidates of causal alarms, important alarms with which the operator should firstly cope, through identifying the cause-consequence relations among alarms based on the design knowledge base in which importance and activating conditions are described for each of 640 alarms in a frame format. The second alarm-handling makes the final judgement with the candidates by using the heuristic knowledge base described as production rules. Then, operation manuals concerning the most important alarms are displayed to operators. JOYCAT has been in commission since September of 1990, after a wide scope of validation tests by using an on-site full-scope training simulator. (author)

  1. An integrated architecture for the ITER RH control system

    International Nuclear Information System (INIS)

    Hamilton, David Thomas; Tesini, Alessandro

    2012-01-01

    Highlights: ► Control system architecture integrating ITER remote handling equipment systems. ► Standard control system architecture for remote handling equipment systems. ► Research and development activities to validate control system architecture. ► Standardization studies to select standard parts for control system architecture. - Abstract: The ITER remote handling (RH) system has been divided into 7 major equipment system procurements that deliver complete systems (operator interfaces, equipment controllers, and equipment) according to task oriented functional specifications. Each equipment system itself is an assembly of transporters, power manipulators, telemanipulators, vehicular systems, cameras, and tooling with a need for controllers and operator interfaces. From an operational perspective, the ITER RH systems are bound together by common control rooms, operations team, and maintenance team; and will need to achieve, to a varying degree, synchronization of operations, co-operation on tasks, hand-over of components, and sharing of data and resources. The separately procured RH systems must, therefore, be integrated to form a unified RH system for operation from the RH control rooms. The RH system will contain a heterogeneous mix of specially developed RH systems and off-the-shelf RH equipment and parts. The ITER Organization approach is to define a control system architecture that supports interoperable heterogeneous modules, and to specify a standard set of modules for each system to implement within this architecture. Compatibility with standard parts for selected modules is required to limit the complexity for operations and maintenance. A key requirement for integrating the control system modules is interoperability, and no module should have dependencies on the implementation details of other modules. The RH system is one of the ITER Plant systems that are integrated and coordinated through the hierarchical structure of the ITER CODAC system

  2. Development of remote handling system based on 3-D shape recognition technique

    International Nuclear Information System (INIS)

    Tomizuka, Chiaki; Takeuchi, Yutaka

    2006-01-01

    In a nuclear facility, the maintenance and repair activities must be done remotely in a radioactive environment. Fuji Electric Systems Co., Ltd. has developed a remote handling system based on 3-D recognition technique. The system recognizes the pose and position of the target to manipulate, and visualizes the scene with the target in 3-D, enabling an operator to handle it easily. This paper introduces the concept and the key features of this system. (author)

  3. Distributed control system for the FMIT

    International Nuclear Information System (INIS)

    Johnson, J.A.; Machen, D.R.; Suyama, R.M.

    1979-01-01

    The control system for the Fusion Materials Irradiation Test (FMIT) Facility will provide the primary data acquisition, control, and interface components that integrate all of the individual FMIT systems into a functional facility. The control system consists of a distributed computer network, control consoles and instrumentation subsystems. The FMIT Facility will be started, operated and secured from a Central Control Room. All FMIT systems and experimental functions will be monitored from the Central Control Room. The data acquisition and control signals will be handled by a data communications network, which connects dual computers in the Central Control Room to the microcomputers in CAMAC crates near the various subsystems of the facility

  4. Supervision and atuomatic control of robotics systems in nuclear environments

    International Nuclear Information System (INIS)

    Benner, J.; Leinemann, K.

    1992-01-01

    The paper describes new developments in controlling remote handling systems for nuclear applications. The main emphasis is to use robotic equipment and methods for reaching a high degree of system autonomy. A remote handling workstation concept is described, supporting various stages of mission planning and supervision by means of suited geometrical, procedural and functional models. The presented control system enables easy switching between semi-autonomous and manual task execution and sensor data integration. Some experimental results of a prototypic implementation are also described

  5. Supervision and automatic control of robotic systems in nuclear environments

    International Nuclear Information System (INIS)

    Benner, J.; Leinemann, K.

    1992-01-01

    This paper describes new developments in controlling remote handling systems for nuclear applications. The main emphasis is to use robotic equipment and methods for reaching a high degree of system autonomy. A remote handling workstation concept is described, supporting various stages of mission planning and supervision by means of suited geometrical, procedural and functional models. The presented control system enables easy switching between semi-autonomous and manual task execution and sensor data integration. Some experimental results of a prototypic implementation are also described

  6. CHLOE: a system for the automatic handling of spark pictures

    International Nuclear Information System (INIS)

    Butler, J.W.; Hodges, D.; Royston, R.

    The system for automatic data handling uses commercially available or state-of-the-art components. The system is flexible enough to accept information from various types of experiments involving photographic data acquisition

  7. Grain Handling and Storage.

    Science.gov (United States)

    Harris, Troy G.; Minor, John

    This text for a secondary- or postecondary-level course in grain handling and storage contains ten chapters. Chapter titles are (1) Introduction to Grain Handling and Storage, (2) Elevator Safety, (3) Grain Grading and Seed Identification, (4) Moisture Control, (5) Insect and Rodent Control, (6) Grain Inventory Control, (7) Elevator Maintenance,…

  8. Temperature Control System for Chromel-Alumel Thermocouple

    International Nuclear Information System (INIS)

    Piping Supriatna; Nurhanan; Riswan DJ; Heru K, B.; Edi Karyanta

    2003-01-01

    Nuclear Power Plan Operation Safety needs serious handling on temperature measurement and control. In this report has been done manufacturing Temperature Control System for Chromel-Alumel Thermocouple, accordance to material, equipment and human resource ability in the laboratory. Basic component for the Temperature Control System is LM-741 type of Operation Amplifier, which is functionalized as summer for voltage comparator. Function test for this Control System shown its ability for damping on temperature reference. The Temperature Control System will be implemented on PCB Processing Machine. (author)

  9. Overview of the preliminary design of the ITER plasma control system

    Science.gov (United States)

    Snipes, J. A.; Albanese, R.; Ambrosino, G.; Ambrosino, R.; Amoskov, V.; Blanken, T. C.; Bremond, S.; Cinque, M.; de Tommasi, G.; de Vries, P. C.; Eidietis, N.; Felici, F.; Felton, R.; Ferron, J.; Formisano, A.; Gribov, Y.; Hosokawa, M.; Hyatt, A.; Humphreys, D.; Jackson, G.; Kavin, A.; Khayrutdinov, R.; Kim, D.; Kim, S. H.; Konovalov, S.; Lamzin, E.; Lehnen, M.; Lukash, V.; Lomas, P.; Mattei, M.; Mineev, A.; Moreau, P.; Neu, G.; Nouailletas, R.; Pautasso, G.; Pironti, A.; Rapson, C.; Raupp, G.; Ravensbergen, T.; Rimini, F.; Schneider, M.; Travere, J.-M.; Treutterer, W.; Villone, F.; Walker, M.; Welander, A.; Winter, A.; Zabeo, L.

    2017-12-01

    An overview of the preliminary design of the ITER plasma control system (PCS) is described here, which focusses on the needs for 1st plasma and early plasma operation in hydrogen/helium (H/He) up to a plasma current of 15 MA with moderate auxiliary heating power in low confinement mode (L-mode). Candidate control schemes for basic magnetic control, including divertor operation and kinetic control of the electron density with gas puffing and pellet injection, were developed. Commissioning of the auxiliary heating systems is included as well as support functions for stray field topology and real-time plasma boundary reconstruction. Initial exception handling schemes for faults of essential plant systems and for disruption protection were developed. The PCS architecture was also developed to be capable of handling basic control for early commissioning and the advanced control functions that will be needed for future high performance operation. A plasma control simulator is also being developed to test and validate control schemes. To handle the complexity of the ITER PCS, a systems engineering approach has been adopted with the development of a plasma control database to keep track of all control requirements.

  10. NOVANET: communications network for a control system

    International Nuclear Information System (INIS)

    Hill, J.R.; Severyn, J.R.; VanArsdall, P.J.

    1983-01-01

    NOVANET is a control system oriented fiber optic local area network that was designed to meet the unique and often conflicting requirements of the Nova laser control system which will begin operation in 1984. The computers and data acquisition devices that form the distributed control system for a large laser fusion research facility need reliable, high speed communications. Both control/status messages and experimental data must be handled. A subset of NOVANET is currently operating on the two beam Novette laser system

  11. Conceptual design report for a remotely operated cask handling system

    International Nuclear Information System (INIS)

    Yount, J.A.; Berger, J.D.

    Recent advances in remote handling utilizing commercial robotics are conceptually applied to the problem of lowering operator cumulative dose and increasing throughput during cask handling operations in proposed nuclear waste container shipping and receiving facilities. The functional criteria for each subsystem are defined, and candidate systems are described. The report also contains a generic description of a waste receiving facility, to show possible deployment configurations for the equipment

  12. Development and implementation of automated radioactive materials handling systems

    International Nuclear Information System (INIS)

    Jacoboski, D.L.

    1992-12-01

    Material handling of radioactive and hazardous materials has forced the need to pursue remotely operated and robotic systems in light of operational safety concerns. Manual maneuvering, repackaging, overpacking and inspecting of containers which store radioactive and hazardous materials is the present mode of operation at the Department of Energy (DOE) Fernald Environmental Management Project (FEMP) in Fernald Ohio. The manual methods are unacceptable in the eyes of concerned site workers and influential community oversight committees. As an example to respond to the FEMP material handling needs, design efforts have been initiated to provide a remotely operated system to repackage thousands of degradated drums containing radioactive Thorium: Later, the repackaged Thorium will be shipped offsite to a predesignated repository again requiring remote operation

  13. Conceptual design report for a remotely operated cask handling system. Revision 1

    International Nuclear Information System (INIS)

    Yount, J.A.; Berger, J.D.

    1984-09-01

    Recent advances in remote handling utilizing commercial robotics are conceptually applied to lowering operator cumulative radiation exposure and increasing throughput during cask handling operations in nuclear shipping and receiving facilities. Revision 1 incorporates functional criteria for facility equipment, equipment technical outline specifications, and interface control drawings to assist Architect Engineers in the application of remote handling to waste shipping and receiving facilities. The document has also been updated to show some of the equipment used in proof-of-principle testing during fiscal year 1984. 10 references, 50 figures, 1 table

  14. Analysis of operational possibilities and conditions of remote handling systems in nuclear facilities

    International Nuclear Information System (INIS)

    Hourfar, D.

    1989-01-01

    Accepting the development of the occupational radiation exposure in nuclear facilities, it will be showing possibilities of cost effective reduction of the dose rate through the application of robots and manipulators for the maintenance of nuclear power plants, fuel reprocessing plants, decommissioning and dismantling of the mentioned plants. Based on the experiences about industrial robot applications by manufacturing and manipulator applications by the handling of radioactive materials as well as analysis of the handling procedures and estimation of the dose intensity, it will be defining task-orientated requirements for the conceptual design of the remote handling systems. Furthermore the manifold applications of stationary and mobil arranged handling systems in temporary or permanent operation are described. (orig.) [de

  15. A versatile data handling system for nuclear physics experiments based on PDP 11/03 micro-computers

    International Nuclear Information System (INIS)

    Raaf, A.J. de

    1979-01-01

    A reliable and low cost data handling system for nuclear physics experiments is described. It is based on two PDP 11/03 micro-computers together with Gec-Elliott CAMAC equipment. For the acquisition of the experimental data a fast system has been designed. It consists of a controller for four ADCs together with an intelligent 38k MOS memory with a word size of 24 bits. (Auth.)

  16. For the whole power plant a BBC control system

    International Nuclear Information System (INIS)

    Koelsch, G.

    1978-01-01

    Description of the boiler control system Decontrol K, which is a part of the BBC control system PROCONTROL K. The system is easy to handle and is easily serviced, and the effects in case a unit fails are very small. (RW) [de

  17. A tyre slip-based integrated chassis control of front/rear traction distribution and four-wheel independent brake from moderate driving to limit handling

    Science.gov (United States)

    Joa, Eunhyek; Park, Kwanwoo; Koh, Youngil; Yi, Kyongsu; Kim, Kilsoo

    2018-04-01

    This paper presents a tyre slip-based integrated chassis control of front/rear traction distribution and four-wheel braking for enhanced performance from moderate driving to limit handling. The proposed algorithm adopted hierarchical structure: supervisor - desired motion tracking controller - optimisation-based control allocation. In the supervisor, by considering transient cornering characteristics, desired vehicle motion is calculated. In the desired motion tracking controller, in order to track desired vehicle motion, virtual control input is determined in the manner of sliding mode control. In the control allocation, virtual control input is allocated to minimise cost function. The cost function consists of two major parts. First part is a slip-based tyre friction utilisation quantification, which does not need a tyre force estimation. Second part is an allocation guideline, which guides optimally allocated inputs to predefined solution. The proposed algorithm has been investigated via simulation from moderate driving to limit handling scenario. Compared to Base and direct yaw moment control system, the proposed algorithm can effectively reduce tyre dissipation energy in the moderate driving situation. Moreover, the proposed algorithm enhances limit handling performance compared to Base and direct yaw moment control system. In addition to comparison with Base and direct yaw moment control, comparison the proposed algorithm with the control algorithm based on the known tyre force information has been conducted. The results show that the performance of the proposed algorithm is similar with that of the control algorithm with the known tyre force information.

  18. Adaptive and energy efficient SMA-based handling systems

    Science.gov (United States)

    Motzki, P.; Kunze, J.; Holz, B.; York, A.; Seelecke, S.

    2015-04-01

    Shape Memory Alloys (SMA's) are known as actuators with very high energy density. This fact allows for the construction of very light weight and energy-efficient systems. In the field of material handling and automated assembly process, the avoidance of big moments of inertia in robots and kinematic units is essential. High inertial forces require bigger and stronger robot actuators and thus higher energy consumption and costs. For material handling in assembly processes, many different individual grippers for various work piece geometries are used. If one robot has to handle different work pieces, the gripper has to be exchanged and the assembly process is interrupted, which results in higher costs. In this paper, the advantages of using high energy density Shape Memory Alloy actuators in applications of material-handling and gripping-technology are explored. In particular, light-weight SMA actuated prototypes of an adaptive end-effector and a vacuum-gripper are constructed via rapid-prototyping and evaluated. The adaptive end-effector can change its configuration according to the work piece geometry and allows the handling of multiple different shaped objects without exchanging gripper tooling. SMA wires are used to move four independent arms, each arm adds one degree of freedom to the kinematic unit. At the tips of these end-effector arms, SMA-activated suction cups can be installed. The suction cup prototypes are developed separately. The flexible membranes of these suction cups are pulled up by SMA wires and thus a vacuum is created between the membrane and the work piece surface. The self-sensing ability of the SMA wires are used in both prototypes for monitoring their actuation.

  19. On the control performance of motors driven by long cables for remote handling at ITER

    International Nuclear Information System (INIS)

    Sol, Enrique del; Meek, Richard; Ruiz Morales, Emilio; Vitelli, Ricardo; Esqué, Salvador

    2016-01-01

    Highlights: • We show the dangerous effects of reflections on the actuator’s system. • We prove how to solve the reflections issue with a commercial LC filter. • We study the filter influence for short cables on two control modes. • We show the filter performance under a real remote handling operation. • We study the excellent performance of the filter for different cable lengths. - Abstract: Pulse Width Modulation (PWM) is nowadays the most used method for controlling a servo-motor. When combining PWM with motors and long cables, such as the ones that will be found at ITER, the standing waves originated are potentially very harmful for both actuator’s life span and control performance. Several methods have been investigated to cope with this issue, such as the use of chokes, filters, snubbers or active modification of the PWM signal. Of all possible locations where an electrical servo-motor could be used at ITER, the most critical scenario arises when mounting a low power motor, with a low gear ratio, in a dexterous manipulator for bilateral teleoperation. In those circumstances cable lengths of more than 150 m are expected between manipulator and control cubicle. In this paper, the effects of long cables in the system safety are analysed on a custom made test bench. The most common solutions to cope with this issue are analysed and a commercial LC filter is selected for further experimentation. An extensive set of experiments are carried out in order to validate the proposed solution for being used on remote handling equipment at ITER.

  20. On the control performance of motors driven by long cables for remote handling at ITER

    Energy Technology Data Exchange (ETDEWEB)

    Sol, Enrique del, E-mail: enrique.delsol@oxfordtechnologies.co.uk [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon OX141RL (United Kingdom); Meek, Richard [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon OX141RL (United Kingdom); Ruiz Morales, Emilio; Vitelli, Ricardo; Esqué, Salvador [Fusion for Energy, Josep Pla, 2, Barcelona 08019 (Spain)

    2016-06-15

    Highlights: • We show the dangerous effects of reflections on the actuator’s system. • We prove how to solve the reflections issue with a commercial LC filter. • We study the filter influence for short cables on two control modes. • We show the filter performance under a real remote handling operation. • We study the excellent performance of the filter for different cable lengths. - Abstract: Pulse Width Modulation (PWM) is nowadays the most used method for controlling a servo-motor. When combining PWM with motors and long cables, such as the ones that will be found at ITER, the standing waves originated are potentially very harmful for both actuator’s life span and control performance. Several methods have been investigated to cope with this issue, such as the use of chokes, filters, snubbers or active modification of the PWM signal. Of all possible locations where an electrical servo-motor could be used at ITER, the most critical scenario arises when mounting a low power motor, with a low gear ratio, in a dexterous manipulator for bilateral teleoperation. In those circumstances cable lengths of more than 150 m are expected between manipulator and control cubicle. In this paper, the effects of long cables in the system safety are analysed on a custom made test bench. The most common solutions to cope with this issue are analysed and a commercial LC filter is selected for further experimentation. An extensive set of experiments are carried out in order to validate the proposed solution for being used on remote handling equipment at ITER.

  1. Synthesis of the unmanned aerial vehicle remote control augmentation system

    International Nuclear Information System (INIS)

    Tomczyk, Andrzej

    2014-01-01

    Medium size Unmanned Aerial Vehicle (UAV) usually flies as an autonomous aircraft including automatic take-off and landing phases. However in the case of the on-board control system failure, the remote steering is using as an emergency procedure. In this reason, remote manual control of unmanned aerial vehicle is used more often during take-of and landing phases. Depends on UAV take-off mass and speed (total energy) the potential crash can be very danger for airplane and environment. So, handling qualities of UAV is important from pilot-operator point of view. In many cases the dynamic properties of remote controlling UAV are not suitable for obtaining the desired properties of the handling qualities. In this case the control augmentation system (CAS) should be applied. Because the potential failure of the on-board control system, the better solution is that the CAS algorithms are placed on the ground station computers. The method of UAV handling qualities shaping in the case of basic control system failure is presented in this paper. The main idea of this method is that UAV reaction on the operator steering signals should be similar - almost the same - as reaction of the 'ideal' remote control aircraft. The model following method was used for controller parameters calculations. The numerical example concerns the medium size MP-02A UAV applied as an aerial observer system

  2. Synthesis of the unmanned aerial vehicle remote control augmentation system

    Energy Technology Data Exchange (ETDEWEB)

    Tomczyk, Andrzej, E-mail: A.Tomczyk@prz.edu.pl [Department of Avionics and Control Systems, Faculty of Mechanical Engineering and Aeronautics, Rzeszów University of Technology, Al. Powstañców Warszawy 12, 35-959 Rzeszów (Poland)

    2014-12-10

    Medium size Unmanned Aerial Vehicle (UAV) usually flies as an autonomous aircraft including automatic take-off and landing phases. However in the case of the on-board control system failure, the remote steering is using as an emergency procedure. In this reason, remote manual control of unmanned aerial vehicle is used more often during take-of and landing phases. Depends on UAV take-off mass and speed (total energy) the potential crash can be very danger for airplane and environment. So, handling qualities of UAV is important from pilot-operator point of view. In many cases the dynamic properties of remote controlling UAV are not suitable for obtaining the desired properties of the handling qualities. In this case the control augmentation system (CAS) should be applied. Because the potential failure of the on-board control system, the better solution is that the CAS algorithms are placed on the ground station computers. The method of UAV handling qualities shaping in the case of basic control system failure is presented in this paper. The main idea of this method is that UAV reaction on the operator steering signals should be similar - almost the same - as reaction of the 'ideal' remote control aircraft. The model following method was used for controller parameters calculations. The numerical example concerns the medium size MP-02A UAV applied as an aerial observer system.

  3. Modelling dust liberation in bulk material handling systems

    NARCIS (Netherlands)

    Derakhshani, S.M.

    2016-01-01

    Dust has negative effects on the environmental conditions, human health as well as industrial equipment and processes. In this thesis, the transfer point of a belt conveyor as a bulk material handling system with a very high potential place for dust liberation is studied. This study is conducted

  4. Contamination confinement system of irradiated materials handling laboratories

    International Nuclear Information System (INIS)

    Lobao, A. dos S.T.; Araujo, J.A. de; Camilo, R.L.

    1988-06-01

    A study to prevent radioctivity release in lab scale is presented. As a basis for the design all the limits established by the IAEA for ventilation systems were observed. An evaluation of the different parameters involved in the design have been made, resulting in the especification of the working areas, ducts and filtering systems in order to get the best conditions for the safe handling of irradiated materials. (author) [pt

  5. Eye-in-Hand Manipulation for Remote Handling: Experimental Setup

    Science.gov (United States)

    Niu, Longchuan; Suominen, Olli; Aref, Mohammad M.; Mattila, Jouni; Ruiz, Emilio; Esque, Salvador

    2018-03-01

    A prototype for eye-in-hand manipulation in the context of remote handling in the International Thermonuclear Experimental Reactor (ITER)1 is presented in this paper. The setup consists of an industrial robot manipulator with a modified open control architecture and equipped with a pair of stereoscopic cameras, a force/torque sensor, and pneumatic tools. It is controlled through a haptic device in a mock-up environment. The industrial robot controller has been replaced by a single industrial PC running Xenomai that has a real-time connection to both the robot controller and another Linux PC running as the controller for the haptic device. The new remote handling control environment enables further development of advanced control schemes for autonomous and semi-autonomous manipulation tasks. This setup benefits from a stereovision system for accurate tracking of the target objects with irregular shapes. The overall environmental setup successfully demonstrates the required robustness and precision that remote handling tasks need.

  6. TITLE III EVALUATION REPORT FOR THE MATERIAL AND PERSONNEL HANDLING SYSTEM

    International Nuclear Information System (INIS)

    T. A. Misiak

    1998-01-01

    This Title III Evaluation Report (TER) provides the results of an evaluation that was conducted on the Material and Personnel Handling System. This TER has been written in accordance with the ''Technical Document Preparation Plan for the Mined Geologic Disposal System Title III Evaluation Reports'' (BA0000000-01717-4600-00005 REV 03). The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the as-constructed Material and Personnel Handling System. Recommendations for resolving discrepancies between the as-constructed system, the technical baseline requirements, and the baseline design are included in this report. Cost and Schedule estimates are provided for all recommended modifications

  7. Three-dimensional television system for remote handling

    International Nuclear Information System (INIS)

    Dumbreck, A.A.; Abel, E.

    1988-01-01

    The paper refers to work previously described on the development of 3-D Television Systems. 3-D TV had been developed with a view to proving whether it was a useful remote handling tool which would be easy to use and comfortable to view. The paper summarizes the work of evaluation trials at UK facilities and reviews the developments which have subsequently taken place. 3-D TV systems have been found to give improved performance in terms of speed and accuracy of operations and to reduce the number of camera views required. (author)

  8. A high intensity beam handling system at the KEK-PS new experimental hall

    International Nuclear Information System (INIS)

    Tanaka, K.H.; Minakawa, M.; Yamanoi, Y.

    1991-01-01

    We would like to summarize newly developed technology for handling high-intensity beams. This was practically employed in the beam-handling system of primary protons at the KEK-PS new experimental hall. (author)

  9. Challenges and innovative technologies on fuel handling systems for future sodium-cooled fast reactors

    International Nuclear Information System (INIS)

    Chassignet, Mathieu; Dumas, Sebastien; Penigot, Christophe; Prele, Gerard; Capitaine, Alain; Rodriguez, Gilles; Sanseigne, Emmanuel; Beauchamp, Francois

    2011-01-01

    The reactor refuelling system provides the means of transporting, storing, and handling reactor core subassemblies. The system consists of the facilities and equipment needed to accomplish the scheduled refuelling operations. The choice of a FHS impacts directly on the general design of the reactor vessel (primary vessel, storage, and final cooling before going to reprocessing), its construction cost, and its availability factor. Fuel handling design must take into account various items and in particular operating strategies such as core design and management and core configuration. Moreover, the FHS will have to cope with safety assessments: a permanent cooling strategy to prevent fuel clad rupture, plus provisions to handle short-cooled fuel and criteria to ensure safety during handling. In addition, the handling and elimination of residual sodium must be investigated; it implies specific cleaning treatment to prevent chemical risks such as corrosion or excess hydrogen production. The objective of this study is to identify the challenges of a SFR fuel handling system. It will then present the range of technical options incorporating innovative technologies under development to answer the GENERATION IV SFR requirements. (author)

  10. Advanced robotic remote handling system for reactor dismantlement

    International Nuclear Information System (INIS)

    Shinohara, Yoshikuni; Usui, Hozumi; Fujii, Yoshio

    1991-01-01

    An advanced robotic remote handling system equipped with a multi-functional amphibious manipulator has been developed and used to dismantle a portion of radioactive reactor internals of an experimental boiling water reactor in the program of reactor decommissioning technology development carried out by the Japan Atomic Energy Research Institute. (author)

  11. Bifurcation methods of dynamical systems for handling nonlinear ...

    Indian Academy of Sciences (India)

    physics pp. 863–868. Bifurcation methods of dynamical systems for handling nonlinear wave equations. DAHE FENG and JIBIN LI. Center for Nonlinear Science Studies, School of Science, Kunming University of Science and Technology .... (b) It can be shown from (15) and (18) that the balance between the weak nonlinear.

  12. A shuttle and space station manipulator system for assembly, docking, maintenance, cargo handling and spacecraft retrieval (preliminary design). Volume 3: Concept analysis. Part 1: Technical

    Science.gov (United States)

    1972-01-01

    Information backing up the key features of the manipulator system concept and detailed technical information on the subsystems are presented. Space station assembly and shuttle cargo handling tasks are emphasized in the concept analysis because they involve shuttle berthing, transferring the manipulator boom between shuttle and station, station assembly, and cargo handling. Emphasis is also placed on maximizing commonality in the system areas of manipulator booms, general purpose end effectors, control and display, data processing, telemetry, dedicated computers, and control station design.

  13. SHOOT2.0: An indirect grid shooting package for optimal control problems, with switching handling and embedded continuation

    OpenAIRE

    Martinon , Pierre; Gergaud , Joseph

    2010-01-01

    The SHOOT2.0 package implements an indirect shooting method for optimal control problems. It is specifically designed to handle control discontinuities, with an automatic switching detection that requires no assumptions concerning the number of switchings. Special care is also devoted to the computation of the Jacobian matrix of the shooting function, using the variational system instead of classical finite differences. The package also features an embedded continuation method and an automati...

  14. Haptic shared control improves hot cell remote handling despite controller inaccuracies

    International Nuclear Information System (INIS)

    Oosterhout, J. van; Abbink, D.A.; Koning, J.F.; Boessenkool, H.; Wildenbeest, J.G.W.; Heemskerk, C.J.M.

    2013-01-01

    Highlights: Haptic shared control is generally based upon perfect environment information. A realistic implementation holds model errors with respect to the environment. Operators were aided with inaccurate guiding forces during a peg-in-hole task. The results showed that small guiding inaccuracies still aid the operator. -- Abstract: A promising solution to improve task performance in ITER hot cell remote handling is the use of haptic shared control. Haptic shared control can assist the human operator along a safe and optimal path with continuous guiding forces from an intelligent autonomous controller. Previous research tested such controllers with accurate knowledge of the environment (giving flawless guiding forces), while in a practical implementation guidance forces will sometimes be flawed due to inaccurate models or sensor information. This research investigated the effect of zero and small (7.5 mm) errors on task performance compared to normal (unguided) operation. In a human factors experiment subjects performed a three dimensional virtual reality peg-in-hole type task (30 mm diameter; 0.1 mm clearance), with and without potentially flawed haptic shared control. The results showed that the presence of guiding forces, despite of small guiding errors, still improved task performance with respect to unguided operations

  15. Haptic shared control improves hot cell remote handling despite controller inaccuracies

    Energy Technology Data Exchange (ETDEWEB)

    Oosterhout, J. van, E-mail: J.vanOosterhout@differ.nl [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Abbink, D.A. [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Koning, J.F. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands); Boessenkool, H. [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Wildenbeest, J.G.W. [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands); Heemskerk, C.J.M. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands)

    2013-10-15

    Highlights: Haptic shared control is generally based upon perfect environment information. A realistic implementation holds model errors with respect to the environment. Operators were aided with inaccurate guiding forces during a peg-in-hole task. The results showed that small guiding inaccuracies still aid the operator. -- Abstract: A promising solution to improve task performance in ITER hot cell remote handling is the use of haptic shared control. Haptic shared control can assist the human operator along a safe and optimal path with continuous guiding forces from an intelligent autonomous controller. Previous research tested such controllers with accurate knowledge of the environment (giving flawless guiding forces), while in a practical implementation guidance forces will sometimes be flawed due to inaccurate models or sensor information. This research investigated the effect of zero and small (7.5 mm) errors on task performance compared to normal (unguided) operation. In a human factors experiment subjects performed a three dimensional virtual reality peg-in-hole type task (30 mm diameter; 0.1 mm clearance), with and without potentially flawed haptic shared control. The results showed that the presence of guiding forces, despite of small guiding errors, still improved task performance with respect to unguided operations.

  16. Development of a remote handling system for replacement of armor tiles in the Fusion Experimental Reactor

    International Nuclear Information System (INIS)

    Adachi, J.; Kakudate, S.; Oka, K.; Seki, M.

    1995-01-01

    The armor tiles of the Fusion Experimental Reactor (FER) planned by JAERI are categorized as scheduled maintenance components, since they are damaged by severe heat and particle loads from the plasma during operation. A remote handling system is thus required to replace a large number of tiles rapidly in the highly activated reactor. However, the simple teaching-playback method cannot be adapted to this system because of deflection of the tiles caused by thermal deformation and so on. We have developed a control system using visual feedback control to adapt to this deflection and an end-effector for a single arm. We confirm their performance in tests. (orig.)

  17. Development of measuring and control systems for underwater cutting of radioactive components

    International Nuclear Information System (INIS)

    Drews, P.; Fuchs, K.

    1990-01-01

    The underwater dismantling of nuclear power plants has to be remotely controlled with simultaneous optical control by underwater cameras. It is this optical control in particular that leads to problems as, for example, abrasive wheel cutting is subjected to a wide range of interferences so that a minimum of contrast and blurred contours of camera images must be accounted for. This paper describes a new image processing system that has been developed in addition to the use of a modified underwater TV camera for optical cutting process control (plasma and abrasive wheel cutting). Workpiece recognition is performed through the comparison of actually measured objects with pre-trained reference patterns allowing the determination of object location and orientation, the data of which are then supplied to the handling controller. A completely satisfactory prototype system has been built, which is capable of performing image analysis (workpiece recognition, workpiece position, etc.) as well as the control of a handling system with an inductive sensor (distance detection, edge recognition and distance control). With an additional camera the operator has the means of visual process observation. The overall functioning of the system has been tested and demonstrated with a four-axes handling system. (author)

  18. Conceptual design of divertor cassette handling by remote handling system for JT-60SA

    International Nuclear Information System (INIS)

    Hayashi, Takao; Sakurai, Shinji; Masaki, Kei; Tamai, Hiroshi; Yoshida, Kiyoshi; Matsukawa, Makoto

    2007-01-01

    The JT-60SA aims to contribute and supplement ITER toward DEMO reactor based on tokamak concept. One of the features of JT-60SA is its high power long pulse heating, causing the large annual neutron fluence. Because the expected dose rate at the vacuum vessel (VV) may exceed 1 mSv/hr after 10 years operation and three month cooling, the human access inside the VV is prohibited. Therefore a remote handling (RH) system is necessary for the maintenance and repair of in-vessel components. This paper described the RH system of JT-60SA, especially the expansion of the RH rail and exchange of the divertor modules. The RH rail is divided into nine and three-point mounting. The nine sections can cover 225 degrees in toroidal direction. A divertor module, which is 10 degrees wide in toroidal direction and weighs 500kg itself due to the limitations of port width and handling weight, can be exchanged by heavy weight manipulator (HWM). The HWM brings the divertor module to the front of the other RH port, which is used for supporting the rail and/or carrying in and out equipments. Then another RH device receives and brings out the module by a pallet installed from outside the VV. (author)

  19. Conceptual design of divertor cassette handling by remote handling system of JT-60SA

    International Nuclear Information System (INIS)

    Hayashi, Takao; Sakurai, Shinji; Masaki, Kei; Tamai, Hiroshi; Yoshida, Kiyoshi; Matsukawa, Makoto

    2008-01-01

    The JT-60SA aims to contribute and supplement ITER toward demonstration fusion reactor based on tokamak concept. One of the features of JT-60SA is its high power long pulse heating, causing the large annual neutron fluence. Because the expected dose rate at the vacuum vessel (VV) may exceed 1 mSv/hr after 10 years operation and three month cooling, the human access inside the VV is restricted. Therefore a remote handling (RH) system is necessary for the maintenance and repair of in-vessel components. This paper described the RH system of JT-60SA, especially the expansion of the RH rail and exchange of the divertor cassettes. The RH rail is divided into nine and three-point mounting. The nine sections can cover 225 degrees in toroidal direction. A divertor cassette, which is 10 degrees wide in toroidal direction and weighs 500 kg itself due to the limitations of port width and handling weight, can be exchanged by heavy weight manipulator (HWM). The HWM brings the divertor cassette to the front of the other RH port, which is used for supporting the rail and/or carrying in and out equipments. Then another RH device receives and brings out the cassette by a pallet installed from outside the VV. (author)

  20. Qt based GUI system for EPICS control systems

    International Nuclear Information System (INIS)

    Rhyder, A.; Fernandes, R.N.; Starritt, A.

    2012-01-01

    The Qt-based GUI system developed at the Australian Synchrotron for use on EPICS control systems has recently been enhanced to including support for imaging, plotting, user login, logging and configuration recipes. Plans are also being made to broaden its appeal within the wider EPICS community by expanding the range of development options and adding support for EPICS V4. Current features include graphical and non-graphical application development as well as simple 'code-free' GUI design. Additional features will allow developers to let the GUI system handle its own data using Qt-based EPICS-aware classes or, as an alternative, use other control systems data such as PSI's CAFE. (author)

  1. Systems for harvesting and handling cotton plant residue

    Energy Technology Data Exchange (ETDEWEB)

    Coates, W. [Univ. of Arizona, Tucson, AZ (United States)

    1993-12-31

    In the warmer regions of the United States, cotton plant residue must be buried to prevent it from serving as an overwintering site for insect pests such as the pink bollworm. Most of the field operations used to bury the residue are high energy consumers and tend to degrade soil structure, thereby increasing the potential for erosion. The residue is of little value as a soil amendment and consequently is considered a negative value biomass. A commercial system to harvest cotton plant residue would be of both economic and environmental benefit to cotton producers. Research has been underway at the University of Arizona since the spring of 1991 to develop a commercially viable system for harvesting cotton plant residue. Equipment durability, degree of densification, energy required, cleanliness of the harvested material, and ease of product handling and transport are some of the performance variables which have been measured. Two systems have proven superior. In both, the plants are pulled from the ground using an implement developed specifically for the purpose. In one system, the stalks are baled using a large round baler, while in the other the stalks are chopped with a forage harvester, and then made into packages using a cotton module maker. Field capacities, energy requirements, package density and durability, and ease of handling with commercially available equipment have been measured for both systems. Selection of an optimum system for a specific operation depends upon end use of the product, and upon equipment availability.

  2. Potential applications of advanced remote handling and maintenance technology to future waste handling facilities

    International Nuclear Information System (INIS)

    Kring, C.T.; Herndon, J.N.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at the Oak Ridge National Laboratory (ORNL) has been advancing the technology in remote handling and remote maintenance of in-cell systems planned for future US nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor are directly applicable to the in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The ORNL developments are based on the application of teleoperated force-reflecting servomanipulators controlled by an operator completely removed from the hazardous environment. These developments address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in a waste handling facility. Employing technological advancements in dexterous manipulators, as well as basic design guidelines that have been developed for remotely maintained equipment and processes, can increase operation and maintenance system capabilities, thereby allowing the attainment of two Federal Waste Management System major objectives: decreasing plant personnel radiation exposure and increasing plant availability by decreasing the mean-time-to-repair in-cell maintenance and process equipment

  3. Potential applications of advanced remote handling and maintenance technology to future waste handling facilities

    International Nuclear Information System (INIS)

    Kring, C.T.; Herndon, J.N.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at the Oak Ridge National Laboratory (ORNL) has been advancing the technology in remote handling and remote maintenance of in-cell systems planned for future U.S. nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor are directly applicable to the in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The ORNL developments are based on the application of teleoperated force-reflecting servomanipulators controlled by an operator completely removed from the hazardous environment. These developments address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in a waste handling facility. Employing technological advancements in dexterous manipulators, as well as basic design guidelines that have been developed for remotely maintained equipment and processes, can increase operation and maintenance system capabilities, thereby allowing the attainment of two Federal Waste Management System major objectives: decreasing plant personnel radiation exposure and increasing plant availability by decreasing the mean-time-to-repair in-cell maintenance and process equipment

  4. Study over problems related to fuel and ash handling systems; Probleminventering braensle- och askhantering

    Energy Technology Data Exchange (ETDEWEB)

    Njurell, Rolf; Wikman, Karin [AaF-Energi och Miljoe AB, Stockhom (Sweden)

    2003-10-01

    There have been a lot of problems related to fuel and ash handling systems since the combustion of different types of biofuels started in the 70s. Many measures have been taken to solve some of the problems, but others have become part of the daily work. The purpose of this study has been to do a compilation of the fuel and ash handling problems that exist at different types of heat and power plants. The study over problems related to fuel and ash handling systems has been carried out through a questionnaire via the Internet. Directors at about 150 energy production plants were contacted by phone or e-mail in the beginning of the project and asked to participate in the study. 72 of these plants accepted to fill in the questionnaire. After several reminders by e-mails and phone calls there were in the end 32 plants that completed the form. Together they reported about 25 problems related to fuel handling and 27 problems related to ash handling. In general each of the plants reported one problem of each kind. Even if the material from the questionnaire is not enough to make statistical analysis a few conclusions can be made about the most common problems, the cause of the problems and where they appear. Fuel handling problems that occur at several plants are stoppage in the conveying equipment, bridging in the boiler silo or the tipping bunker and problems with the sieve for separation. The distribution of the fuel handling problems is almost equal for all equipment parts (receiving, separation, transport etc.). For the ash handling systems problems with transport of dry bottom ash dominate, followed by and the moistening of fly ash and transport of wet bottom ash. Most of the problems related to fuel handling are caused by the fuel quality. For example several plants have reported that bark is a fuel that is hard to handle. Nevertheless the quality for a specific fuel is not always bad when it is delivered to the plant but the fuel quality might change during

  5. Handling system for nuclear fuel cans to a fuel pellet feeder

    International Nuclear Information System (INIS)

    Vere, B.; Mathevon, P.

    1985-01-01

    The handling system comprises a first array of conveyors which takes a batch of casings from a delivery rack, alters the spacing between the casings, and delivers them to a vibrating table feeder, a second array of conveyors which readjusts the spacing between casing to its initial value and transfers the casings to a removal rack, and automatic and synchronized control means for ensuring the displacements of casings always in the same direction. The increase of spacing between casings can be used, before feeding, to allow them to be weighed one after the other, and after feeding, for cleaning the end part of fuel cans [fr

  6. System for handling and storing radioactive waste

    Science.gov (United States)

    Anderson, John K.; Lindemann, Paul E.

    1984-01-01

    A system and method for handling and storing spent reactor fuel and other solid radioactive waste, including canisters to contain the elements of solid waste, storage racks to hold a plurality of such canisters, storage bays to store these racks in isolation by means of shielded doors in the bays. This system also includes means for remotely positioning the racks in the bays and an access tunnel within which the remotely operated means is located to position a rack in a selected bay. The modular type of these bays will facilitate the construction of additional bays and access tunnel extension.

  7. Man-machine cooperation in remote handling for fusion plants

    International Nuclear Information System (INIS)

    Leinemann, K.

    1984-01-01

    Man-machine cooperation in remote handling for fusion plants comprises cooperation for design of equipment and planning of procedures using a CAD system, and cooperation during operation of the equipment with computer aided telemanipulation systems (CAT). This concept is presently being implemented for support of slave positioning, camera tracking, and camera alignment in the KfK manipulator test facility. The pilot implementation will be used to test various man-machine interface layouts, and to establish a set of basic buildings blocks for future implementations of advanced remote handling control systems. (author)

  8. The on-board data handling system of the AFIS-P mission

    Energy Technology Data Exchange (ETDEWEB)

    Gaisbauer, Dominic; Greenwald, Daniel; Hahn, Alexander; Hauptmann, Philipp; Konorov, Igor; Meng, Lingxin; Paul, Stephan; Poeschl, Thomas [Physics Department E18, Technische Universitaet Muenchen (Germany); Losekamm, Martin [Physics Department E18, Technische Universitaet Muenchen (Germany); Institute of Astronautics, Technische Universitaet Muenchen (Germany); Renker, Dieter [Physics Department E17, Technische Universitaet Muenchen (Germany)

    2014-07-01

    The Antiproton Flux in Space experiment (AFIS) is a novel particle detector comprised of silicon photomultipliers and scintillating plastic fibers. Its purpose is to measure the trapped antiproton flux in low Earth orbit. To test the detector and the data acquisition system, a prototype detector will be flown aboard a high altitude research balloon as part of the REXUS/BEXUS program by the German Aerospace Center (DLR). This talk presents the on-board data handling system and the ground support equipment of AFIS-P. It will also highlight the data handling algorithms developed and used for the mission.

  9. Evaluating ITER remote handling middleware concepts

    International Nuclear Information System (INIS)

    Koning, J.F.; Heemskerk, C.J.M.; Schoen, P.; Smedinga, D.; Boode, A.H.; Hamilton, D.T.

    2013-01-01

    Highlights: ► Remote Handling Study Centre: middleware system setup and modules built. ► Aligning to ITER RH Control System Layout: prototype of database, VR and simulator. ► OpenSplice DDS, ZeroC ICE messaging and object oriented middlewares reviewed. ► Windows network latency found problematic for semi-realtime control over the network. -- Abstract: Remote maintenance activities in ITER will be performed by a unique set of hardware systems, supported by an extensive software kit. A layer of middleware will manage and control a complex set of interconnections between teams of operators, hardware devices in various operating theatres, and databases managing tool and task logistics. The middleware is driven by constraints on amounts and timing of data like real-time control loops, camera images, and database access. The Remote Handling Study Centre (RHSC), located at FOM institute DIFFER, has a 4-operator work cell in an ITER relevant RH Control Room setup which connects to a virtual hot cell back-end. The centre is developing and testing flexible integration of the Control Room components, resulting in proof-of-concept tests of this middleware layer. SW components studied include generic human-machine interface software, a prototype of a RH operations management system, and a distributed virtual reality system supporting multi-screen, multi-actor, and multiple independent views. Real-time rigid body dynamics and contact interaction simulation software supports simulation of structural deformation, “augmented reality” operations and operator training. The paper presents generic requirements and conceptual design of middleware components and Operations Management System in the context of a RH Control Room work cell. The simulation software is analyzed for real-time performance and it is argued that it is critical for middleware to have complete control over the physical network to be able to guarantee bandwidth and latency to the components

  10. Evaluating ITER remote handling middleware concepts

    Energy Technology Data Exchange (ETDEWEB)

    Koning, J.F., E-mail: j.f.koning@differ.nl [FOM Institute DIFFER, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Heemskerk, C.J.M.; Schoen, P.; Smedinga, D. [Heemskerk Innovative Technology, Noordwijk (Netherlands); Boode, A.H. [University of Applied Sciences InHolland, Alkmaar (Netherlands); Hamilton, D.T. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2013-10-15

    Highlights: ► Remote Handling Study Centre: middleware system setup and modules built. ► Aligning to ITER RH Control System Layout: prototype of database, VR and simulator. ► OpenSplice DDS, ZeroC ICE messaging and object oriented middlewares reviewed. ► Windows network latency found problematic for semi-realtime control over the network. -- Abstract: Remote maintenance activities in ITER will be performed by a unique set of hardware systems, supported by an extensive software kit. A layer of middleware will manage and control a complex set of interconnections between teams of operators, hardware devices in various operating theatres, and databases managing tool and task logistics. The middleware is driven by constraints on amounts and timing of data like real-time control loops, camera images, and database access. The Remote Handling Study Centre (RHSC), located at FOM institute DIFFER, has a 4-operator work cell in an ITER relevant RH Control Room setup which connects to a virtual hot cell back-end. The centre is developing and testing flexible integration of the Control Room components, resulting in proof-of-concept tests of this middleware layer. SW components studied include generic human-machine interface software, a prototype of a RH operations management system, and a distributed virtual reality system supporting multi-screen, multi-actor, and multiple independent views. Real-time rigid body dynamics and contact interaction simulation software supports simulation of structural deformation, “augmented reality” operations and operator training. The paper presents generic requirements and conceptual design of middleware components and Operations Management System in the context of a RH Control Room work cell. The simulation software is analyzed for real-time performance and it is argued that it is critical for middleware to have complete control over the physical network to be able to guarantee bandwidth and latency to the components.

  11. Development of simulator for remote handling system of ITER blanket

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakanhira, Masataka; Matsumoto, Yasuhiro; Shibanuma, K.

    2007-01-01

    The maintenance activity in the ITER has to be performed remotely because 14 MeV neutron caused by fusion reaction induces activation of structural material and emission of gamma ray. In general, it is one of the most critical issues to avoid collision between the remote maintenance system and in-vessel components. Therefore, the visual information in the vacuum vessel is required strongly to understand arrangement of these devices and components. However, there is a limitation of arrangement of viewing cameras in the vessel because of high intensity of gamma ray. It is expected that enough numbers of cameras and lights are not available because of arrangement restriction. Furthermore, visibility of the interested area such as the contacting part is frequently disturbed by the devices and components, thus it is difficult to recognize relative position between the devices and components only by visual information even if enough cameras and lights are equipped. From these reasons, the simulator to recognize the positions of each devices and components is indispensable for remote handling systems in fusion reactors. The authors have been developed a simulator for the remote maintenance system of the ITER blanket using a general 3D robot simulation software ''ENVISION''. The simulator is connected to the control system of the manipulator which was developed as a part of the blanket maintenance system in the EDA and can reconstruct the positions of the manipulator and the blanket module using the position data of the motors through the LAN. In addition, it can provide virtual visual information, such as the connecting operation behind the blanket module with making the module transparent on the screen. It can be used also for checking the maintenance sequence before the actual operation. The developed simulator will be modified further adding other necessary functions and finally completed as a prototype of the actual simulator for the blanket remote handling system

  12. Control device for handling device of control rod drive

    International Nuclear Information System (INIS)

    Sasaki, Toshiya

    1998-01-01

    A predetermined aimed portion of control rod drives disposed in a pedestal is photographed, and image data and camera data including the position of the camera are outputted. Edge cut out processing image data are formed based on the outputted image data, and aimed image data and aimed camera data obtained when previously positioning the handling device precisely to a predetermined aimed position are stored. The aimed image data are taken out from the aimed image data file to prepare computer graphic image data, and there is disposed an image superposing processing portion for comparing images based on the computer graphic image data and images based on the image data for edge cut out processing, as well as comparing the aimed camera data and the camera data, and displaying each of them to an image display portion. (I.S.)

  13. Control system for Siam photon source

    CERN Document Server

    Apiwatwaja, R; Isoyama, G; Ishii, T; Pairsuwan, W

    2003-01-01

    A new computer control system has been developed for Siam photon source, which is the first synchrotron light source in Thailand, personal computers and PLC's have been employed which are connected together through Ethernet. Man Machine Interface Stations (MMIS) at the front end act as a graphical user interface within Windows environment. The monitoring and controlling of individual devices is handled through several pairs of digital control station and the device interface located in each part of the synchrotron complex. The installation of the control system has been completed. The commissioning test of the control system is underway and the reliability of the system is on the positive side. Details of commissioning tests as well as characteristics of this newly built control system for the Siam photon source are described in this report.

  14. Design characteristics of pantograph type in vessel fuel handling system in SFR

    International Nuclear Information System (INIS)

    Kim, S. H.; Koo, G. H.

    2012-01-01

    The pantograph type in vessel fuel handling system in a sodium cooled fast reactor (SFR), which requires installation space for the slot in the upper internal structure attached under the rotating plug, is composed of an in vessel transfer machine (IVTM), a single rotating plug, in vessel storage, and a fuel transfer port (FTP). The pantograph type IVTM can exchange fuel assemblies through a slot, the design requirement of which should be essentially considered in the design of the in vessel fuel handling system. In addition, the spent fuel assemblies temporarily stored in the in vessel storage of the reactor vessel are removed to the outside of the reactor vessel through the FTP. The fuel transfer basket is then provided in the FTP, and a fuel transfer is performed by using it. In this study, the design characteristics for a pantograph type in vessel fuel handling system are reviewed, and the preconceptual designs are studied

  15. Design characteristics of pantograph type in vessel fuel handling system in SFR

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. H.; Koo, G. H. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    The pantograph type in vessel fuel handling system in a sodium cooled fast reactor (SFR), which requires installation space for the slot in the upper internal structure attached under the rotating plug, is composed of an in vessel transfer machine (IVTM), a single rotating plug, in vessel storage, and a fuel transfer port (FTP). The pantograph type IVTM can exchange fuel assemblies through a slot, the design requirement of which should be essentially considered in the design of the in vessel fuel handling system. In addition, the spent fuel assemblies temporarily stored in the in vessel storage of the reactor vessel are removed to the outside of the reactor vessel through the FTP. The fuel transfer basket is then provided in the FTP, and a fuel transfer is performed by using it. In this study, the design characteristics for a pantograph type in vessel fuel handling system are reviewed, and the preconceptual designs are studied.

  16. Fault tolerant control of systems with saturations

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik

    2013-01-01

    This paper presents framework for fault tolerant controllers (FTC) that includes input saturation. The controller architecture known from FTC is based on the Youla-Jabr-Bongiorno-Kucera (YJBK) parameterization is extended to handle input saturation. Applying this controller architecture in connec......This paper presents framework for fault tolerant controllers (FTC) that includes input saturation. The controller architecture known from FTC is based on the Youla-Jabr-Bongiorno-Kucera (YJBK) parameterization is extended to handle input saturation. Applying this controller architecture...... in connection with faulty systems including input saturation gives an additional YJBK transfer function related to the input saturation. In the fault free case, this additional YJBK transfer function can be applied directly for optimizing the feedback loop around the input saturation. In the faulty case......, the design problem is a mixed design problem involved both parametric faults and input saturation....

  17. New handling systems as technical support for the working process. Part 6. Feeding devices

    Energy Technology Data Exchange (ETDEWEB)

    Becher, H; Burkhardt, R; Drexel, P; Graf, B; Krreis, W

    1982-03-01

    Social, technical and economic reasons require an enhanced application of handling systems such as industrial robots. Quality and efficiency of an industrial robot depends greatly on feeding devices, and the ARGE-HHS within its project new handling systems as a technical aid in the working process intends to analyze all feeding devices that are likely to be most suitable for advanced applications. Forty one feeding devices were developed, known devices were modified, adapted to different applications, and tested. A variety of feeding devices for most applications in the field of material handling is reported.

  18. 324 Building liquid waste handling and removal system project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ham, J.E.

    1998-07-29

    This report evaluates the modification options for handling radiological liquid waste generated during decontamination and cleanout of the 324 Building. Recent discussions indicate that the Hanford site railroad system will be closed by the end of FY 1998 necessitating the need for an alternate transfer method. The issue of handling of Radioactive Liquid Waste (RLW) from the 324 Building (assuming the 340 Facility is not available to accept the RLW) has been examined in at least two earlier engineering studies (Parsons 1997a and Hobart 1997). Each study identified a similar preferred alternative that included modifying the 324 Building RLWS to allow load-out of wastewater to a truck tanker, while making maximum use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes to the building. This alternative is accepted as the basis for further discussion presented in this study. The goal of this engineering study is to verify the path forward presented in the previous studies and assure that the selected alternative satisfies the 324 Building deactivation goals and objectives as currently described in the project management plan. This study will also evaluate options available to implement the preferred alternative and select the preferred option for implementation of the entire system. Items requiring further examination will also be identified. Finally, the study will provide a conceptual design, schedule and cost estimate for the required modifications to the 324 Building to allow removal of RLW. Attachment 5 is an excerpt from the project baseline schedule found in the Project Management Plan.

  19. Radiation-tolerant cable management systems for remote handling applications in the nuclear industry

    International Nuclear Information System (INIS)

    Cullen, S.; Thom, M.

    1993-01-01

    Experience has shown that one of the most vulnerable areas within remote handling equipment is the umbilical cable and termination system. Repairs of a damaged system can be very long due to poorly designed termination techniques. Over the past five years W.L. Gore has gained considerable experience in the design and manufacture of cable systems, utilising unique radiation tolerant materials and manufacturing processes. The cable systems manufactured at the W.L. Gore, Dunfermline, Scotland facility have proven to give excellent performance in the most demanding of remote handling applications. (author)

  20. Control measurement system in purex process

    International Nuclear Information System (INIS)

    Mani, V.V.S.

    1985-01-01

    The dependence of a bulk facility handling Purex Process on the control measurement system for evaluating the process performance needs hardly be emphasized. process control, Plant control, inventory control and quality control are the four components of the control measurement system. The scope and requirements of each component are different and the measurement methods are selected accordingly. However, each measurement system has six important elements. These are described in detail. The quality assurance programme carried out by the laboratory as a mechanism through which the quality of measurements is regularly tested and stated in quantitative terms is also explained in terms of internal and external quality assurance, with examples. Suggestions for making the control measurement system more responsive to the operational needs in future are also briefly discussed. (author)

  1. 40 CFR 65.161 - Continuous records and monitoring system data handling.

    Science.gov (United States)

    2010-07-01

    ... section. (D) Owners and operators shall retain the current description of the monitoring system as long as... Routing to a Fuel Gas System or a Process § 65.161 Continuous records and monitoring system data handling...) Monitoring system breakdowns, repairs, preventive maintenance, calibration checks, and zero (low-level) and...

  2. Extreme coal handling

    Energy Technology Data Exchange (ETDEWEB)

    Bradbury, S; Homleid, D. [Air Control Science Inc. (United States)

    2004-04-01

    Within the journals 'Focus on O & M' is a short article describing modifications to coal handling systems at Eielson Air Force Base near Fairbanks, Alaska, which is supplied with power and heat from a subbituminous coal-fired central plant. Measures to reduce dust include addition of an enclosed recirculation chamber at each transfer point and new chute designs to reduce coal velocity, turbulence, and induced air. The modifications were developed by Air Control Science (ACS). 7 figs., 1 tab.

  3. The gun control system of the IFUSP microtron

    International Nuclear Information System (INIS)

    Malafronte, A.A.; Takahashi, J.; Bonini, A.L.; Martins, M.N.

    1997-01-01

    A thermionic gun control system has been developed for the IFUSP microtron. The control system, which is composed of a dedicated microcomputer, A/D converter, grid pulser, filament and grid power supplies, is kept at a high voltage potential. The gun parameters are handled through a PC computer at ground potential via fiber-optic link. (orig.)

  4. Design of systems for handling radioactive ion exchange resin beads

    International Nuclear Information System (INIS)

    Shapiro, S.A.; Story, G.L.

    1979-01-01

    The flow of slurries in pipes is a complex phenomenon. There are little slurry data available on which to base the design of systems for radioactive ion exchange resin beads and, as a result, the designs vary markedly in operating plants. With several plants on-line, the opportunity now exists to evaluate the designs of systems handling high activity spent resin beads. Results of testing at Robbins and Meyers Pump Division to quantify the behavior of resin bead slurries are presented. These tests evaluated the following slurry parameters; resin slurry velocity, pressure drop, bead degradation, and slurry concentration effects. A discussion of the general characteristics of resin bead slurries is presented along with a correlation to enable the designer to establish the proper flowrate for a given slurry composition and flow regime as a function of line size. Guidelines to follow in designing a resin handling system are presented

  5. TFTR diagnostic control and data acquisition system

    International Nuclear Information System (INIS)

    Sauthoff, N.R.; Daniels, R.E.; PPL Computer Division

    1985-01-01

    General computerized control and data-handling support for TFTR diagnostics is presented within the context of the Central Instrumentation, Control and Data Acquisition (CICADA) System. Procedures, hardware, the interactive man--machine interface, event-driven task scheduling, system-wide arming and data acquisition, and a hierarchical data base of raw data and results are described. Similarities in data structures involved in control, monitoring, and data acquisition afford a simplification of the system functions, based on ''groups'' of devices. Emphases and optimizations appropriate for fusion diagnostic system designs are provided. An off-line data reduction computer system is under development

  6. Material control system simulator program reference manual

    Energy Technology Data Exchange (ETDEWEB)

    Hollstien, R.B.

    1978-01-24

    A description is presented of a Material Control System Simulator (MCSS) program for determination of material accounting uncertainty and system response to particular adversary action sequences that constitute plausible material diversion attempts. The program is intended for use in situations where randomness, uncertainty, or interaction of adversary actions and material control system components make it difficult to assess safeguards effectiveness against particular material diversion attempts. Although MCSS may be used independently in the design or analysis of material handling and processing systems, it has been tailored toward the determination of material accountability and the response of material control systems to adversary action sequences.

  7. Material control system simulator program reference manual

    International Nuclear Information System (INIS)

    Hollstien, R.B.

    1978-01-01

    A description is presented of a Material Control System Simulator (MCSS) program for determination of material accounting uncertainty and system response to particular adversary action sequences that constitute plausible material diversion attempts. The program is intended for use in situations where randomness, uncertainty, or interaction of adversary actions and material control system components make it difficult to assess safeguards effectiveness against particular material diversion attempts. Although MCSS may be used independently in the design or analysis of material handling and processing systems, it has been tailored toward the determination of material accountability and the response of material control systems to adversary action sequences

  8. Advanced remote handling for future applications: The advanced integrated maintenance system

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Rowe, J.C.

    1986-01-01

    The Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. The developed technology has a wide spectrum of application for other hazardous environments. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, installation, and operation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  9. Handling device with grips operated by a servo-motor

    International Nuclear Information System (INIS)

    Sgarbi, F.; Detriche, J.M.

    1990-01-01

    On grip jaws are set up a detection circuit which allows the rocking of the control system from a control system in position to a control system in clamping strain when an object is held, and then which allows to use them by turns in order to keep only their advantages. A larger light touch handling is obtained. The application of this grip is recommended to catch brittle objects (for handicapped persons by example) [fr

  10. Implementation strategy for the ITER plasma control system

    International Nuclear Information System (INIS)

    Winter, A.; Ambrosino, G.; Bauvir, B.; De Tommasi, G.; Humphreys, D.A.; Mattei, M.; Neto, A.; Raupp, G.; Snipes, J.A.; Stephen, A.V.; Treutterer, W.; Walker, M.L.; Zabeo, L.

    2015-01-01

    This paper gives an overview of the scope and context of the CODAC high-level real-time applications (Supervision and Plasma Control) and presents the strategy and current state of design of the tools to support the implementation. A real-time framework, which is currently under development with strong support of the worldwide fusion community will not only support the implementation of plasma control strategies with the extensive exception handling and forecasting functionality foreseen for ITER, but also integrated commissioning, orchestration and supervision as well as the real-time needs of ITER plant system developers. A second cornerstone in the implementation strategy is the development of a powerful simulation environment (Plasma Control System Simulation Platform – PCSSP) to design and verify control strategies, event handling and orchestration and automation. The development of PCSSP is currently under contract and this paper will also give an overview of its current state of development.

  11. Implementation strategy for the ITER plasma control system

    Energy Technology Data Exchange (ETDEWEB)

    Winter, A., E-mail: axel.winter@iter.org [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Ambrosino, G. [CREATE/Università di Napoli Federico II, Dip. Ingegneria Elettrica e delle Tecnologie dell’Informazione (Italy); Bauvir, B. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); De Tommasi, G. [CREATE/Università di Napoli Federico II, Dip. Ingegneria Elettrica e delle Tecnologie dell’Informazione (Italy); Humphreys, D.A. [General Atomics, San Diego, CA (United States); Mattei, M. [CREATE/Seconda Università di Napoli, Dip. Ingegneria Industriale e dell’Informazione (Italy); Neto, A. [Fusion for Energy, Barcelona (Spain); Raupp, G. [Max Planck Institute for Plasma Physics, EURATOM Association, Garching (Germany); Snipes, J.A. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Stephen, A.V. [Culham Centre for Fusion Energy, Culham Science Centre, Abingdon (United Kingdom); Treutterer, W. [Max Planck Institute for Plasma Physics, EURATOM Association, Garching (Germany); Walker, M.L. [General Atomics, San Diego, CA (United States); Zabeo, L. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France)

    2015-10-15

    This paper gives an overview of the scope and context of the CODAC high-level real-time applications (Supervision and Plasma Control) and presents the strategy and current state of design of the tools to support the implementation. A real-time framework, which is currently under development with strong support of the worldwide fusion community will not only support the implementation of plasma control strategies with the extensive exception handling and forecasting functionality foreseen for ITER, but also integrated commissioning, orchestration and supervision as well as the real-time needs of ITER plant system developers. A second cornerstone in the implementation strategy is the development of a powerful simulation environment (Plasma Control System Simulation Platform – PCSSP) to design and verify control strategies, event handling and orchestration and automation. The development of PCSSP is currently under contract and this paper will also give an overview of its current state of development.

  12. CLASSIFICATION OF THE MGR MUCK HANDLING SYSTEM

    International Nuclear Information System (INIS)

    R. Garrett

    1999-01-01

    The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) muck handling system structures, systems and components (SSCs) performed by the MGR Safety Assurance Department. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMP 1998). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333P, ''Quality Assurance Requirements and Description (QARD) (DOE 1998). This QA classification incorporates the current MGR design and the results of the ''Preliminary Preclosure Design Basis Event Calculations for the Monitored Geologic Repository (CRWMS M and O 1998a)

  13. Robotic requirements for plutonium handling automation

    International Nuclear Information System (INIS)

    Heywood, A.C.; Armantrout, G.A.

    1990-01-01

    While over 200,000 robots are in manufacturing service worldwide, only two are in use for the handling of plutonium in a glovebox. The difficulties of applying robotics to the glovebox environment include limited access for service and maintenance, radiation damage to electronics and insulators, and abrasion damage to bearings and sliding surfaces. The limited volume of the glovebox environment, and the need to handle heavy workloads, and the need to maximize work volume dictates the use of an overhead gantry system. This paper discusses how the application of such a system will require a robot with extensive safety features, a high degree of flexibility to perform a variety of tasks, and high reliability coupled with an easily serviced design. Substantial challenges exist in control system design, sensor and operator integration, and programming to achieve these goals

  14. The Sample Handling System for the Mars Icebreaker Life Mission: from Dirt to Data

    Science.gov (United States)

    Dave, Arwen; Thompson, Sarah J.; McKay, Christopher P.; Stoker, Carol R.; Zacny, Kris; Paulsen, Gale; Mellerowicz, Bolek; Glass, Brian J.; Wilson, David; Bonaccorsi, Rosalba; hide

    2013-01-01

    The Mars icebreaker life mission will search for subsurface life on mars. It consists of three payload elements: a drill to retrieve soil samples from approx. 1 meter below the surface, a robotic sample handling system to deliver the sample from the drill to the instruments, and the instruments themselves. This paper will discuss the robotic sample handling system.

  15. Advanced remote handling developments for high radiation applications

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Feldman, M.J.; Kuban, D.P.; Martin, H.L.; Rowe, J.C.; Hamel, W.R.

    1985-01-01

    The Remote Control Engineering Task of the Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, and installation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  16. Pilot material handling system for radiation processing of agricultural and medical products

    International Nuclear Information System (INIS)

    Sandha, R.S.; Nageswar Rao, J; Dwivedi, Jishnu; Petwal, V.C.; Soni, H.C.

    2005-01-01

    A 10 MeV, 10 kW electron LINAC based radiation processing facility is being constructed at Centre for Advanced Technology, Indore for radiation processing of various food products like potatoes, onion, spices, home pack items and medical sterilization. A pilot material handling system has been designed, manufactured, and installed at CAT to verify process parameters viz. conveying speed, dose uniformity, and to study the effect of packing shape and size for radiation processing of different product. This paper describes various features of pilot material handling system. (author)

  17. Containment system of contamination in irradiated materials handling laboratories

    International Nuclear Information System (INIS)

    Lobao, A.S.T.; Araujo, J.A. de; Camilo, R.L.

    1988-01-01

    A study to prevent radiactivity release in lab scale is presented. As a basis for the design all the limits established by the IAEA for ventilation systems were observed. An evaluation of the different parameters involved in the design have been made, resulting in the specification of the working areas, ducts and filtering systems in order to get the best conditions for the safe handling of irradiated materials. (author) [pt

  18. Regulatory control analysis and design for sewer systems

    DEFF Research Database (Denmark)

    Mollerup, Ane Loft; Mikkelsen, Peter Steen; Thornberg, Dines

    2015-01-01

    A systematic methodology for regulatory control analysis and design is adapted for sewer system operation and evaluated. The main challenge with adapting the methodology is the handling of the stochastic and transient nature of the rainfall disturbances, inherent to sewer system operation...

  19. Concept report: Microprocessor control of electrical power system

    Science.gov (United States)

    Perry, E.

    1977-01-01

    An electrical power system which uses a microprocessor for systems control and monitoring is described. The microprocessor controlled system permits real time modification of system parameters for optimizing a system configuration, especially in the event of an anomaly. By reducing the components count, the assembling and testing of the unit is simplified, and reliability is increased. A resuable modular power conversion system capable of satisfying a large percentage of space applications requirements is examined along with the programmable power processor. The PC global controller which handles systems control and external communication is analyzed, and a software description is given. A systems application summary is also included.

  20. Architecture of WEST plasma control system

    International Nuclear Information System (INIS)

    Ravenel, N.; Nouailletas, R.; Barana, O.; Brémond, S.; Moreau, P.; Guillerminet, B.; Balme, S.; Allegretti, L.; Mannori, S.

    2014-01-01

    To operate advanced plasma scenario (long pulse with high stored energy) in present and future tokamak devices under safe operation conditions, the control requirements of the plasma control system (PCS) leads to the development of advanced feedback control and real time handling exceptions. To develop these controllers and these exceptions handling strategies, a project aiming at setting up a flight simulator has started at CEA in 2009. Now, the new WEST (W Environment in Steady-state Tokamak) project deals with modifying Tore Supra into an ITER-like divertor tokamak. This upgrade impacts a lot of systems including Tore Supra PCS and is the opportunity to improve the current PCS architecture to implement the previous works and to fulfill the needs of modern tokamak operation. This paper is dealing with the description of the architecture of WEST PCS. Firstly, the requirements will be presented including the needs of new concepts (segments configuration, alternative (or backup) scenario, …). Then, the conceptual design of the PCS will be described including the main components and their functions. The third part will be dedicated to the proposal RT framework and to the technologies that we have to implement to reach the requirements

  1. A Use Case Methodology to Handle Conflicting Controller Requirements for Future Power Systems

    DEFF Research Database (Denmark)

    Heussen, Kai; Uslar, Mathias; Tornelli, Carlo

    2015-01-01

    This paper proposes a standards based requirements elicitation and analysis strategy tailored for smart grid control structure development. Control structures in electric power systems often span across several systems and stakeholders. Requirements elicitation for such control systems therefore...... requires coordination across many stakeholders and it is challenging to achieve a consistent design. To enable an iterative and distributed development we suggest a conflict management approach as a modular element of the design strategy, focusing on conflict identification and tracing. The idea...

  2. 49 CFR 232.609 - Handling of defective equipment with ECP brake systems.

    Science.gov (United States)

    2010-10-01

    ... (ECP) Braking Systems § 232.609 Handling of defective equipment with ECP brake systems. (a) Ninety-five... systems. 232.609 Section 232.609 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRAKE SYSTEM SAFETY STANDARDS FOR FREIGHT...

  3. A pilot's assessment of helicopter handling-quality factors common to both agility and instrument flying tasks

    Science.gov (United States)

    Gerdes, R. M.

    1980-01-01

    A series of simulation and flight investigations were undertaken to evaluate helicopter flying qualities and the effects of control system augmentation for nap-of-the-Earth (NOE) agility and instrument flying tasks. Handling quality factors common to both tasks were identified. Precise attitude control was determined to be a key requirement for successful accomplishment of both tasks. Factors that degraded attitude controllability were improper levels of control sensitivity and damping, and rotor system cross coupling due to helicopter angular rate and collective pitch input. Application of rate command, attitude command, and control input decouple augmentation schemes enhanced attitude control and significantly improved handling qualities for both tasks. The NOE agility and instrument flying handling quality considerations, pilot rating philosophy, and supplemental flight evaluations are also discussed.

  4. DAΦNE Control System status and performance

    International Nuclear Information System (INIS)

    Di Pirro, G.; Drago, A.; Mazzitelli, G.; Milardi, C.; Sannibale, F.; Stecchi, A.; Stella, A.

    1998-01-01

    The DAΦNE Control System allowed the step by step commissioning of the major subsystems as they were installed, proving to be modular and extensible. Recently the guidelines of the Control System evolution concerned the development of machine operational procedures and the integration of diagnostic tools. Particular attention has been reserved to the problem of saving and restoring element data sts as well as to the DAΦNE general data handling. A system overview including installation status, features, and operation results is presented

  5. Autonomous control systems: applications to remote sensing and image processing

    Science.gov (United States)

    Jamshidi, Mohammad

    2001-11-01

    One of the main challenges of any control (or image processing) paradigm is being able to handle complex systems under unforeseen uncertainties. A system may be called complex here if its dimension (order) is too high and its model (if available) is nonlinear, interconnected, and information on the system is uncertain such that classical techniques cannot easily handle the problem. Examples of complex systems are power networks, space robotic colonies, national air traffic control system, and integrated manufacturing plant, the Hubble Telescope, the International Space Station, etc. Soft computing, a consortia of methodologies such as fuzzy logic, neuro-computing, genetic algorithms and genetic programming, has proven to be powerful tools for adding autonomy and semi-autonomy to many complex systems. For such systems the size of soft computing control architecture will be nearly infinite. In this paper new paradigms using soft computing approaches are utilized to design autonomous controllers and image enhancers for a number of application areas. These applications are satellite array formations for synthetic aperture radar interferometry (InSAR) and enhancement of analog and digital images.

  6. Potential application of nuclear remote-handling technology to underwater inspection and maintenance

    International Nuclear Information System (INIS)

    Eccleston, M.J.

    1990-01-01

    Examples are given of remote handling equipment developed within the nuclear industry and employing telemanipulative or telerobotic principles. In telerobotics the nuclear industry has been following a trend towards increased levels of autonomy, delegating operator control to a computer, for example, in resolved rate manipulator tip control, teach-and-repeat control and collision avoidance. Illustrations are presented of remote-handling techniques from the nuclear industry which may be carried over into undersea remote inspection, maintenance and repair systems. (author)

  7. Sample handling for kinetics and molecular assembly in flow cytometry

    Energy Technology Data Exchange (ETDEWEB)

    Sklar, L.A. [Los Alamos National Lab., NM (United States). National Flow Cytometry Resource]|[Univ. of New Mexico, Albuquerque, NM (United States). School of Medicine; Seamer, L.C.; Kuckuck, F.; Prossnitz, E.; Edwards, B. [Univ. of New Mexico, Albuquerque, NM (United States). School of Medicine; Posner, G. [Northern Arizona Univ., Flagstaff, AZ (United States). Dept. of Chemistry

    1998-07-01

    Flow cytometry discriminates particle associated fluorescence from the fluorescence of the surrounding medium. It permits assemblies of macromolecular complexes on beads or cells to be detected in real-time with precision and specificity. The authors have investigated two types of robust sample handling systems which provide sub-second resolution and high throughput: (1) mixers which use stepper-motor driven syringes to initiate chemical reactions in msec time frames; and (2) flow injection controllers with valves and automated syringes used in chemical process control. In the former system, the authors used fast valves to overcome the disparity between mixing 100 {micro}ls of sample in 100 msecs and delivering sample to a flow cytometer at 1 {micro}l/sec. Particles were detected within 100 msec after mixing, but turbulence was created which lasted for 1 sec after injection of the sample into the flow cytometer. They used optical criteria to discriminate particles which were out of alignment due to the turbulent flow. Complex sample handling protocols involving multiple mixing steps and sample dilution have also been achieved. With the latter system they were able to automate sample handling and delivery with intervals of a few seconds. The authors used a fluidic approach to defeat turbulence caused by sample introduction. By controlling both sheath and sample with individual syringes, the period of turbulence was reduced to {approximately} 200 msecs. Automated sample handling and sub-second resolution should permit broad analytical and diagnostic applications of flow cytometry.

  8. Waste Handling Building Conceptual Study

    International Nuclear Information System (INIS)

    G.W. Rowe

    2000-01-01

    The objective of the ''Waste Handling Building Conceptual Study'' is to develop proposed design requirements for the repository Waste Handling System in sufficient detail to allow the surface facility design to proceed to the License Application effort if the proposed requirements are approved by DOE. Proposed requirements were developed to further refine waste handling facility performance characteristics and design constraints with an emphasis on supporting modular construction, minimizing fuel inventory, and optimizing facility maintainability and dry handling operations. To meet this objective, this study attempts to provide an alternative design to the Site Recommendation design that is flexible, simple, reliable, and can be constructed in phases. The design concept will be input to the ''Modular Design/Construction and Operation Options Report'', which will address the overall program objectives and direction, including options and issues associated with transportation, the subsurface facility, and Total System Life Cycle Cost. This study (herein) is limited to the Waste Handling System and associated fuel staging system

  9. 46 CFR 154.1850 - Entering cargo handling spaces.

    Science.gov (United States)

    2010-10-01

    ..., compressors, and compressor motors. (2) Gas-dangerous cargo control spaces. (3) Other spaces containing cargo... cargo handling spaces. (a) The master shall ensure that the ventilation system under § 154.1200 is in... ventilation system, is posted outside of each space under paragraph (a) of this section. (c) The master shall...

  10. Ergonomics and comfort in lawn mower handle positioning: An evaluation of handle geometry.

    Science.gov (United States)

    Lowndes, Bethany R; Heald, Elizabeth A; Hallbeck, M Susan

    2015-11-01

    Hand operation accompanied with any combination of large forces, awkward positions and repetition may lead to upper limb injury or illness and may be exacerbated by vibration. Commercial lawn mowers expose operators to these factors during actuation of hand controls and therefore may be a health concern. A nontraditional lawn mower control system may decrease upper limb illnesses and injuries through more neutral hand and body positioning. This study compared maximum grip strength in twelve different orientations (3 grip spans and 4 positions) and evaluated self-described comfortable handle positions. The results displayed force differences between nontraditional (X) and both vertical (V) and pistol (P) positions (p < 0.0001) and among the different grip spans (p < 0.0001). Based on these results, recommended designs should incorporate a tilt between 45 and 70°, handle rotations between 48 and 78°, and reduced force requirements or decreased grip spans to improve user health and comfort. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  11. Decree 2211: Standards to control the generation and handling of dangerous wastes

    International Nuclear Information System (INIS)

    1992-01-01

    This Decree has for object to establish the conditions under which should be carried out the activities of generation and handling of dangerous waste, in order to prevent damages to health and to the atmosphere. It includes: definitions; a list of sources of waste; a list of constituent of dangerous waste; the characteristics of danger; a lists of maximum permissible concentrations in leachates, handling of dangerous waste, criterion for transport, monitoring form, storage areas, treatment and final disposition, storage, elimination, incineration, recycling, reuse and recovery, installation and operation of security backfilling, book of waste record, control of activities, obligations in charge of those who manage dangerous waste, and trans border movements of dangerous waste [es

  12. Coal handling system structural analysis for modifications or plant life extension

    International Nuclear Information System (INIS)

    Dufault, A.; Weider, F.; Doyle, P.

    1989-01-01

    One neglected aspect of plant modification or life extension is the extent to which previous projects may have affected the integrity of existing structures. During the course of a project to backfit fire protection facilities to existing coal handling systems, it was found that past modifications had added loads to existing coal handling structures which exceeded the available design margin. This paper describes the studies that discovered the original problem areas, as well as the detailed analysis and design considerations used to repair these structures

  13. Analysis of the new architecture proposal for the CMM control system

    International Nuclear Information System (INIS)

    Heikkilae, L.; Saarinen, H.; Aha, L.; Viinikainen, M.; Mattila, J.; Hahto, A.; Siuko, M.; Semeraro, L.

    2011-01-01

    While developing divertor remote handling maintenance systems at the Divertor Test Platform 2 facility, some risks and sensitivity points related to the Cassette Multifunctional Mover control system software were discovered and evaluated. The control system architecture has to simultaneously fulfill the demanding ITER remote handling requirements and to face new requirements being uncovered during the trials. Especially evolving non-functional requirements such as reliability and safety have an effect on the control system architecture as it is getting more mature. An evaluation of the implications from architectural decisions is necessary before implementation efforts, as an architecture left to develop without evaluation may lead to a dead end and therefore soaring development costs. After studying existing architecture analysis methods an analysis method was developed to gain confidence to carry out the proposed changes.

  14. A rule-based fault detection method for air handling units

    Energy Technology Data Exchange (ETDEWEB)

    Schein, J.; Bushby, S. T.; Castro, N. S. [National Institute of Standards and Technology, Gaithersburg, MD (United States); House, J. M. [Iowa Energy Center, Ankeny, IA (United States)

    2006-07-01

    Air handling unit performance assessment rules (APAR) is a fault detection tool that uses a set of expert rules derived from mass and energy balances to detect faults in air handling units (AHUs). Control signals are used to determine the mode of operation of the AHU. A subset of the expert rules which correspond to that mode of operation are then evaluated to determine whether a fault exists. APAR is computationally simple enough that it can be embedded in commercial building automation and control systems and relies only upon the sensor data and control signals that are commonly available in these systems. APAR was tested using data sets collected from a 'hardware-in-the-loop' emulator and from several field sites. APAR was also embedded in commercial AHU controllers and tested in the emulator. (author)

  15. Underground transportation and handling system for Pollux-casks

    International Nuclear Information System (INIS)

    Schrimpf, C.

    1988-01-01

    The concept for the underground transportation and handling system for Pollux-casks was optimized in a first phase by dividing the process in the repository up into the several transportation and manipulation steps. For each step, the possibilities were described and evaluated by means of a list of criteria (technical, safety and economical criteria). The following concept for the transportation and handling was developed: The casks are transported to the unloading area of the surface facilities by railway or truck. After removal of the transport protection, the entry control is performed. The cask is lifted from the vehicle and placed on a railbound transportation vehicle. This transport unit is transferred to the shaft and placed there ready for shaft hoisting. With the hoisting cage protruding, the transport unit is placed on the hoisting cage by means of a pushing-on device, locked, and then conveyed underground. After arrival on the emplacement level, the transport unit is pulled-off from the hoisting cage and taken over by a mine locomotive and transferred through the transportation and access drifts as far as to the emplacement site. There the locomotive pushed the rail transport vehicle into the emplacement drift, as far as to the designated emplacement position. At the emplacement position, the cask is again lifted by means of hoisting equipment. The rail transport vehicle is pulled out of the emplacement drift and returned to the surface for reloading. After deposition of the cask on the drift floor, the emplacement equipment is pulled back in order to give the operation space free for the slinger backfill truck. Within preceding tests two different backfilling techniques were investigated under realistic conditions: pneumatic backfilling and slinger backfilling. The slinger truck was found to be the most suitable for the designated purpose

  16. Track-mounted remote handling system for the Tokamak Fusion Engineering Test

    International Nuclear Information System (INIS)

    Kelly, V.P.; Berger, J.D.; Daubert, R.L.; Yount, J.A.

    1982-01-01

    Concepts for remote handling machines (IVM) designed to transverse the interior of toroidal vessels with guidance and support from track systems have been developed for the proposed Tokamak Fusion Engineering Test (TFET). TFET has been proposed as an upgrade for the Tokamak Fusion Test Reactor (TFTR), currently nearing completion. The track-mounted IVMs were conceived to perform in-vessel remote maintenance for TFET, including removal and replacement of pump limiter blades and protective tiles as well as other maintenance-related tasks such as vessel wall inspection leak testing and interior cleanup. The conceptual IVMs consist of three manipulator arms mounted on a common frame member: a single power manipulator arm with high load carrying capacity and two lower-capacity servomanipulator arms. Descriptions of the IVM concepts, in-vessel track systems, and ex-vessel handling systems are presented

  17. Development of the Simulation Program for the In-Vessel Fuel Handling System of Double Rotating Plug Type

    International Nuclear Information System (INIS)

    Kim, S. H.; Kim, J. B.

    2011-01-01

    In-vessel fuel handling machines are the main equipment of the in-vessel fuel handling system, which can move the core assembly inside the reactor vessel along with the rotating plug during refueling. The in vessel fuel handling machines for an advanced sodium cooled fast reactor(SFR) demonstration plant are composed of a direct lift machine(DM) and a fixed arm machine(FM). These machines should be able to access all areas above the reactor core by means of the rotating combination of double rotating plugs. Thus, in the in vessel fuel handling system of the double rotating plug type, it is necessary to decide the rotating plug size and evaluate the accessibility of in-vessel fuel handling machines in given core configuration. In this study, the simulation program based on LABVIEW which can effectively perform the arrangement design of the in vessel fuel handling system and simulate the rotating plug motion was developed. Fig. 1 shows the flow chart of the simulation program

  18. Fort St. Vrain fuel-handling system RAM analysis

    International Nuclear Information System (INIS)

    Azizi, S.M.; Berg, G.E.; Burton, J.H.; Durand, R.E.; Larson, E.M.; Pepe, D.J.; Rutherford, P.D.; Novachek, F.J.

    1989-01-01

    Public Service of Company of Colorado (PSC) is planning to decommission its Fort St. Vrain plant in 1990. This requires removal of 1,500 separate assemblies from the core. With the low historical availability of the fuel-handling system (FHS), defueling time was estimated at 36 months. With plant expenses of approximately $1.6 million per month during defueling, this would mean a schedule cost of $58 million. With their contractor, Rockwell International, PSC embarked on a reliability, availability, and maintainability (RAM) analysis to reduce projected defueling time. Key elements included (a) estimating availability of the FHS using a limited historical record, (b) assessing the defueling critical path, and (c) proposing and evaluating design/operational improvements. The most cost-effective improvements are being implemented and are expected to provide a reduction of >18 months in schedule and a net savings of $20 to 25 million. The paper describes the FHS design and operation, major problems associated with fuel-handling operations, and results and recommendations

  19. Automation and remote handling activities in BARC: an overview

    International Nuclear Information System (INIS)

    Badodkar, D.N.

    2016-01-01

    Division of Remote Handling and Robotics, BARC has been working on design and development of various application specific remote handling and automation systems for nuclear front-end and back-end fuel cycle technologies. Division is also engaged in preservice and in-service inspection of coolant channels for Pressurized Heavy Water Reactors in India. Design and development of Reactor Control Mechanisms for Nuclear Research and Power Reactors (PHWRs and Compact LWRs) is another important activity carried out in this division. Robotic systems for Indoor and Outdoor surveillance in and around nuclear installations have also been developed. A line scan camera based system has been developed for measuring individual PHWR fuel pellet lengths as well as stack length. An industrial robot is used for autonomous exchange of pellets to achieve desired stack length. The system can be extended for active fuel pellets also. An automation system has been conceptualized for remote handling and transfer of spent fuel bundles from storage pool directly to the chopper unit of reprocessing plant. In case of Advanced Heavy Water Reactor which uses mixed oxides of (Th-Pu) and (Th-"2"3"3U ) as fuel, automation system for front-end fuel cycle has been designed, which includes Powder processing and pressing; Pellet handling and inspection; Pin handling and inspection; and Cluster assembly and dis-assembly in shielded facilities. System demonstration through fullscale mock-up facility is nearing completion. Above talk is presented on behalf of all the officers and staff of DRHR. The talk is mainly focused on development of an automated fuel fabrication facility for mixed oxides of (Th- Pu)/(Th-"2"3"3U ) fuel pins. An overview of divisional ongoing activities in the field of remote handling and automation are also covered. (author)

  20. Measurement and control system for ITER remote maintenance equipment

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  1. Measurement and control system for ITER remote maintenance equipment

    International Nuclear Information System (INIS)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro

    1998-01-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  2. CLASSIFICATION OF THE MGR WASTE HANDLING BUILDING ELECTRICAL SYSTEM

    International Nuclear Information System (INIS)

    S.E. Salzman

    1999-01-01

    The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) waste handling building electrical system structures, systems and components (SSCs) performed by the MGR Safety Assurance Department. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMP 1998). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333P, ''Quality Assurance Requirements and Description'' (QARD) (DOE 1998)

  3. BASIC overlay for CAMAC data and command handling

    Energy Technology Data Exchange (ETDEWEB)

    Ciftcioglu, O [Istanbul Technical Univ. (Turkey). Inst. for Nuclear Energy

    1979-11-15

    A BASIC overlay has been developed for the BASIC language run in the PDP-11 series of computers. The overlay has particularly been wirtten for a dedicated Camac Crate Controller DC-011 from Ortec. By means of the overlay, any command comprising C, N, A, F information can easily be issued by the host system to communicate with the peripherals connected to the CAMAC system, through the CAMAC interface. The overlay is particularly useful for rather slow control systems and data handling between two different operating systems with incompatible formats for the data files having the CAMAC system as a mutual system component controllable by each of the operating systems individually. The overlay can easily be modified to be used for a Standard controller (type A-1) or any other type of dedicated controller.

  4. Communication systems in JT-60 control

    International Nuclear Information System (INIS)

    Kimura, T.; Hosogane, N.; Kondo, I.; Kumahara, T.; Kurihara, K.; Yonekawa, I.; Yoshino, R.

    1983-01-01

    A new concept in communication is applied to the JT-60 control system which handles a large amount of data for the plant support and monitoring and for the discharge control including plasma feedback control. The communication systems are characterized by 1) adoption of an efficient protocol in the central highways which are composed of dual serial CAMAC ones, 2) standardization of the protocol and data format between the central controller and each subsystem one, 3) adoption of a polling method for plant monitoring and of block transfer for discharge conditions and results, and 4) use of novel modules for the fast data transfer in the real-time systems. A compact tool has also been developed for testing the data communication

  5. The application of AI-based refueling control system to the Fugen NPP

    International Nuclear Information System (INIS)

    Maeda, Koichi; Nakamura, Shinji; Kawasaki, Noboru; Nanko, Takashi; Nishimura, Hiroshi; Tanaka, Koichi

    1996-01-01

    In a refueling operation of the Advanced Thermal Reactor Fugen, it is essential to precisely handle fuel assemblies to guarantee quality and from the standpoint of safety guard. In order to plan and execute efficient operations, knowledge of experienced operators based on experiences is required. Therefore, an automatic control system based on the Artificial Intelligence (AI) technology has been developed, and has been put into operation in actual refueling operations. This system prepares an optimum refueling plan, controls the fuel handling facilities by that plan, displays and prints out the history of transfer and storage of items by automatically sampled data on a work station, a network to express fuel handling facilities and operational rules acquired through operating experiences. The development of this system has made it possible to optimize refueling schedule, save control labor of items and improve reliability of refueling. Firstly the development started the off-line system that prepares optimum refueling plan and gives to the operator step by step instructions for operation, secondly developed the on-line system that automatically controls facilities by that plan. The development of this system started in 1989, the off-line system has been put into practical operation in the 17th refueling in 1991, the 22nd (12th annual inspection) refueling in 1995 has been done by using the on-line system automatically

  6. Criticality safety evaluation report for the cold vacuum drying facility's process water handling system

    International Nuclear Information System (INIS)

    NELSON, J.V.

    1999-01-01

    This report addresses the criticality concerns associated with process water handling in the Cold Vacuum Drying Facility. The controls and limitations on equipment design and operations to control potential criticality occurrences are identified

  7. Switching Fuzzy Guaranteed Cost Control for Nonlinear Networked Control Systems

    Directory of Open Access Journals (Sweden)

    Linqin Cai

    2014-01-01

    Full Text Available This paper deals with the problem of guaranteed cost control for a class of nonlinear networked control systems (NCSs with time-varying delay. A guaranteed cost controller design method is proposed to achieve the desired control performance based on the switched T-S fuzzy model. The switching mechanism is introduced to handle the uncertainties of NCSs. Based on Lyapunov functional approach, some sufficient conditions for the existence of state feedback robust guaranteed cost controller are presented. Simulation results show that the proposed method is effective to guarantee system’s global asymptotic stability and quality of service (QoS.

  8. Development of first full scope commercial CANDU-6 fuel handling simulator

    Energy Technology Data Exchange (ETDEWEB)

    Crawford, W., E-mail: BCrawford@atlanticnuclear.ca [Atlantic Nuclear Services Inc., Fredericton, NB (Canada); McInerney, J. M., E-mail: JMcInerney@nbpower.com [Point Lepreau Generating Station, Maces Bay, NB (Canada); Moran, E.S.; Nice, J. W.; Sinclair, D.M.; Somerville, S.; Usalp, E.C.; Usalp, M., E-mail: EMoran@atlanticnuclear.ca, E-mail: JNice@atlanticnuclear.ca, E-mail: DSinclair@atlanticnuclear.ca, E-mail: SSomerville@atlanticnuclear.ca, E-mail: ECUsalp@atlanticnuclear.ca, E-mail: MUsalp@atlanticnuclear.ca [Atlantic Nuclear Services Inc., Fredericton, NB (Canada)

    2015-07-01

    Unique to CANDU reactors is continuous on-power refueling. In the CANDU-6 design, the fuel bundles are contained within 380 pressure tubes. Fuelling machines, one on either side of the reactor face move on a bridge and carriage system to the appointed channel and fuel under computer control. The fuelling machine is an immensely complicated mechanical device. None of the original Canadian full scope simulators incorporated the interaction of the fuel handling system. Traditionally, the final stages of Fuel Handling Operator qualification utilizes on the job training in a production environment carried out in the station main control room. For the purpose of supporting continual improvement in fuel handling training at the Third Qinshan Nuclear Plant Company (TQNPC), Atlantic Nuclear Services in a joint project with New Brunswick Power, developed the first commercial full scope CANDU-6 Fuel Handling simulator, integrated into the existing TQNPC Full Scope Simulator framework. The TQNPC Fuel Handling simulator is capable of supporting all normal on-power and off-power refuelling procedures as well as other abnormal operating conditions, which will allow training to be conducted, based on the plant specific operating procedures. This paper will discuss its development, the importance of this tool and its advantages over past training practices. (author)

  9. Development of first full scope commercial CANDU-6 fuel handling simulator

    International Nuclear Information System (INIS)

    Crawford, W.; McInerney, J. M.; Moran, E.S.; Nice, J. W.; Sinclair, D.M.; Somerville, S.; Usalp, E.C.; Usalp, M.

    2015-01-01

    Unique to CANDU reactors is continuous on-power refueling. In the CANDU-6 design, the fuel bundles are contained within 380 pressure tubes. Fuelling machines, one on either side of the reactor face move on a bridge and carriage system to the appointed channel and fuel under computer control. The fuelling machine is an immensely complicated mechanical device. None of the original Canadian full scope simulators incorporated the interaction of the fuel handling system. Traditionally, the final stages of Fuel Handling Operator qualification utilizes on the job training in a production environment carried out in the station main control room. For the purpose of supporting continual improvement in fuel handling training at the Third Qinshan Nuclear Plant Company (TQNPC), Atlantic Nuclear Services in a joint project with New Brunswick Power, developed the first commercial full scope CANDU-6 Fuel Handling simulator, integrated into the existing TQNPC Full Scope Simulator framework. The TQNPC Fuel Handling simulator is capable of supporting all normal on-power and off-power refuelling procedures as well as other abnormal operating conditions, which will allow training to be conducted, based on the plant specific operating procedures. This paper will discuss its development, the importance of this tool and its advantages over past training practices. (author)

  10. A Genetic Based Neuro-Fuzzy Controller System

    International Nuclear Information System (INIS)

    Mohamed, A.H.

    2014-01-01

    Recently, the mobile robots have great importance in the manufacturing processes. They are widely used for assembling processes, handling the dangerous components, moving the weighted things, etc. Designing the controller of the mobile robot is a very complex task. Many simple control systems used the neuro-fuzzy controller in the mobile robots. But, they faced with great complexity when moving in unstructured and dynamic environments. The proposed system introduces the uses of the genetic algorithm for optimizing the parameters of the neuro-fuzzy controller. So, the proposed system can improve the performance of the mobile robots. It has applied for a mobile robot used for moving the dangerous and critical materials in unstructured environment. Its results are compared with other traditional controller systems. The suggested system has proved its success for the real-time applications

  11. Spent nuclear fuel retrieval system fuel handling development testing. Final report

    International Nuclear Information System (INIS)

    Jackson, D.R.; Meeuwsen, P.V.

    1997-09-01

    Fuel handling development testing was performed in support of the Fuel Retrieval System (FRS) Sub-Project, a subtask of the Spent Nuclear Fuel Project at the Hanford Site in Richland, Washington. The FRS will be used to retrieve and repackage K-Basin Spent Nuclear Fuel (SNF) currently stored in old K-Plant storage basins. The FRS is required to retrieve full fuel canisters from the basin, clean the fuel elements inside the canister to remove excessive uranium corrosion products (or sludge), remove the contents from the canisters and sort the resulting debris, scrap, and fuel for repackaging. The fuel elements and scrap will be collected in fuel storage and scrap baskets in preparation for loading into a multi canister overpack (MCO), while the debris is loaded into a debris bin and disposed of as solid waste. This report describes fuel handling development testing performed from May 1, 1997 through the end of August 1997. Testing during this period was mainly focused on performance of a Schilling Robotic Systems' Conan manipulator used to simulate a custom designed version, labeled Konan, being fabricated for K-Basin deployment. In addition to the manipulator, the camera viewing system, process table layout, and fuel handling processes were evaluated. The Conan test manipulator was installed and fully functional for testing in early 1997. Formal testing began May 1. The purposes of fuel handling development testing were to provide proof of concept and criteria, optimize equipment layout, initialize the process definition, and identify special needs/tools and required design changes to support development of the performance specification. The test program was set up to accomplish these objectives through cold (non-radiological) development testing using simulated and prototype equipment

  12. Interim report spent nuclear fuel retrieval system fuel handling development testing

    Energy Technology Data Exchange (ETDEWEB)

    Ketner, G.L.; Meeuwsen, P.V.; Potter, J.D.; Smalley, J.T.; Baker, C.P.; Jaquish, W.R.

    1997-06-01

    Fuel handling development testing was performed in support of the Fuel Retrieval System (FRS) Sub-Project at the Hanford Site. The project will retrieve spent nuclear fuel, clean and remove fuel from canisters, repackage fuel into baskets, and load fuel into a multi-canister overpack (MCO) for vacuum drying and interim dry storage. The FRS is required to retrieve basin fuel canisters, clean fuel elements sufficiently of uranium corrosion products (or sludge), empty fuel from canisters, sort debris and scrap from whole elements, and repackage fuel in baskets in preparation for MCO loading. The purpose of fuel handling development testing was to examine the systems ability to accomplish mission activities, optimization of equipment layouts for initial process definition, identification of special needs/tools, verification of required design changes to support performance specification development, and validation of estimated activity times/throughput. The test program was set up to accomplish this purpose through cold development testing using simulated and prototype equipment; cold demonstration testing using vendor expertise and systems; and graphical computer modeling to confirm feasibility and throughput. To test the fuel handling process, a test mockup that represented the process table was fabricated and installed. The test mockup included a Schilling HV series manipulator that was prototypic of the Schilling Hydra manipulator. The process table mockup included the tipping station, sorting area, disassembly and inspection zones, fuel staging areas, and basket loading stations. The test results clearly indicate that the Schilling Hydra arm cannot effectively perform the fuel handling tasks required unless it is attached to some device that can impart vertical translation, azimuth rotation, and X-Y translation. Other test results indicate the importance of camera locations and capabilities, and of the jaw and end effector tool design. 5 refs., 35 figs., 3 tabs.

  13. Development of a virtual reality simulator for the ITER blanket remote handling system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Shibanuma, Kiyoshi; Tesini, Alessandro

    2008-01-01

    The authors developed a simulator for the remote maintenance system of the ITER blanket using a general 3D robotic simulation software, ENVISION. The simulator is connected to the control system of the manipulator, which was developed as part of the blanket maintenance system during the Engineering Design Activity (EDA), and can reconstruct the positions of the manipulator and blanket module using position data transmitted from motors through a LAN. In addition, it can provide virtual visual information (e.g., about the interface structures behind the blanket module) by making the module transparent on the screen. It can also be used for confirming a maintenance sequence before the actual operation. The simulator will be modified further, with addition of other necessary functions, and will finally serve as a prototype of the actual simulator for the blanket remote handling system, which will be procured as part of an in-kind contribution

  14. Experience of Data Handling with IPPM Payload

    Science.gov (United States)

    Errico, Walter; Tosi, Pietro; Ilstad, Jorgen; Jameux, David; Viviani, Riccardo; Collantoni, Daniele

    2010-08-01

    A simplified On-Board Data Handling system has been developed by CAEN AURELIA SPACE and ABSTRAQT as PUS-over-SpaceWire demonstration platform for the Onboard Payload Data Processing laboratory at ESTEC. The system is composed of three Leon2-based IPPM (Integrated Payload Processing Module) computers that play the roles of Instrument, Payload Data Handling Unit and Satellite Management Unit. Two PCs complete the test set-up simulating an external Memory Management Unit and the Ground Control Unit. Communication among units take place primarily through SpaceWire links; RMAP[2] protocol is used for configuration and housekeeping. A limited implementation of ECSS-E-70-41B Packet Utilisation Standard (PUS)[1] over CANbus and MIL-STD-1553B has been also realized. The Open Source RTEMS is running on the IPPM AT697E CPU as real-time operating system.

  15. Nuclear fuel handling apparatus

    International Nuclear Information System (INIS)

    Andrea, C.; Dupen, C.F.G.; Noyes, R.C.

    1977-01-01

    A fuel handling machine for a liquid metal cooled nuclear reactor in which a retractable handling tube and gripper are lowered into the reactor to withdraw a spent fuel assembly into the handling tube. The handling tube containing the fuel assembly immersed in liquid sodium is then withdrawn completely from the reactor into the outer barrel of the handling machine. The machine is then used to transport the spent fuel assembly directly to a remotely located decay tank. The fuel handling machine includes a decay heat removal system which continuously removes heat from the interior of the handling tube and which is capable of operating at its full cooling capacity at all times. The handling tube is supported in the machine from an articulated joint which enables it to readily align itself with the correct position in the core. An emergency sodium supply is carried directly by the machine to provide make up in the event of a loss of sodium from the handling tube during transport to the decay tank. 5 claims, 32 drawing figures

  16. Application of RTOS (OS-9) for control system of INDUS-2

    International Nuclear Information System (INIS)

    Chauhan, Amit; Fatnani, Pravin

    2003-01-01

    A typical control system needs to handle a variety of input/output cards for data acquisition and control. Also it often needs to implement some protocol for communication either on Ethernet or a fieldbus. This paper describes the role of Real Time Operating System (RTOS) OS-9 in the control system of INDUS-2 for implementing the various services. (author)

  17. Remote handling at LAMPF

    International Nuclear Information System (INIS)

    Grisham, D.L.; Lambert, J.E.

    1983-01-01

    Experimental area A at the Clinton P. Anderson Meson Physics Facility (LAMPF) encompasses a large area. Presently there are four experimental target cells along the main proton beam line that have become highly radioactive, thus dictating that all maintenance be performed remotely. The Monitor remote handling system was developed to perform in situ maintenance at any location within area A. Due to the complexity of experimental systems and confined space, conventional remote handling methods based upon hot cell and/or hot bay concepts are not workable. Contrary to conventional remote handling which require special tooling for each specifically planned operation, the Monitor concept is aimed at providing a totally flexible system capable of remotely performing general mechanical and electrical maintenance operations using standard tools. The Monitor system is described

  18. Dynamitron control systems

    International Nuclear Information System (INIS)

    Lisanti, Thomas F.

    2005-01-01

    The Dynamitron control system utilizes the latest personal computer technology in control circuitry and components. Both the DPC-2000 and newer Millennium series of control systems make use of their modular architecture in both software and hardware to keep up with customer and engineering demands. This also allows the main structure of the software to remain constant for the user while software drivers are easily changed as hardware demands are modified and improved. The system is presented as four units; the Remote I/O (Input/Output), Local Analog and Digital I/O, Operator Interface and the Main Computer. The operator is provided with a selection of many informative screen displays. The control program handles all graphic screen displays and the updating of these screens directly; it does not communicate to a display terminal. This adds to the quick response and excellent operator feedback received while operating the accelerator. The CPU also has the ability to store and record all process variable setpoints for each product that will be treated. All process parameters are printed to a report at regular intervals during a process run for record keeping

  19. Technical session 4: Health and safety issues. Working environment control in beryllium handling area

    International Nuclear Information System (INIS)

    Yonehara, K.; Natori, Y.; Tatenuma, K.; Nakamichi, Masaru

    2016-01-01

    Beryllium (Be) and its intermetallic compound (beryllide) are recommended from Japan as the most promising solid neutron multiplier for nuclear fusion power plant. The shape as the neutron multiplier is small sphere (pebble), and the mass production technology of it must be developed urgently. Beryllium is the substance regulated by the law of Ordinance on Prevention of Hazards Due to Specified the Chemical Substances Control. We'll report on a way of the operational environmental management to make a safe Be handling area for the Be handling researchers and workers. (author)

  20. Comparison of Conventional Closed-Loop Controller with an Adaptive Controller for a Disturbed Thermodynamic System

    DEFF Research Database (Denmark)

    Alphinas, Robert A.; Hansen, Hans Henrik; Tambo, Torben

    2017-01-01

    Non-adaptive proportional controllers suffer from the ability to handle a system disturbance leading to a large steady-state error and undesired transient behavior. On the other hand, they are easy to implement and tune. This article examines whether an adaptive controller based on the MIT...

  1. Fault Tolerant Emergency Control to Preserve Power System Stability

    DEFF Research Database (Denmark)

    Pedersen, Andreas Søndergaard; Richter, Jan H.; Tabatabaeipour, Mojtaba

    2016-01-01

    This paper introduces a method for fault-masking and system reconfiguration in power transmission systems. The paper demonstrates how faults are handled by reconfiguring remaining controls through utilisation of wide-area measurement in real time. It is shown how reconfiguration can be obtained u...

  2. Manually controlled neutron-activation system

    International Nuclear Information System (INIS)

    Johns, R.A.; Carothers, G.A.

    1982-01-01

    A manually controlled neutron activation system, the Manual Reactor Activation System, was designed and built and has been operating at one of the Savannah River Plant's production reactors. With this system, samples can be irradiated for up to 24 hours and pneumatically transferred to a shielded repository for decay until their activity is low enough for them to be handled at a radiobench. The Manual Reactor Activation System was built to provide neutron activation of solid waste forms for the Alternative Waste Forms Leach Testing Program. Neutron activation of the bulk sample prior to leaching permits sensitive multielement radiometric analyses of the leachates

  3. Control in the ATLAS TDAQ System

    CERN Document Server

    Liko, D; Flammer, J; Dobson, M; Jones, R; Mapelli, L; Alexandrov, I; Korobov, S; Kotov, V; Mineev, M; Amorim, A; Fiuza de Barros, N; Klose, D; Pedro, L; Badescu, E; Caprini, M; Kolos, S; Kazarov, A; Ryabov, Yu; Soloviev, I; Computing In High Energy Physics

    2005-01-01

    TDAQ system requires a comprehensive and flexible control system. Its role ranges from the so-called run-control, e.g. starting and stopping the data taking, to error handling and fault tolerance. It also includes initialization and verification of the overall system. Following the traditional approach a hierarchical system of customizable controllers has been proposed. For the final system all functionality will be therefore available in a distributed manner, with the possibility of local customization. After a technology survey the open source expert system CLIPS has been chosen as a basis for the implementation of the supervision and the verification system. The CLIPS interpreter has been extended to provide a general control framework. Other ATLAS Online software components have been integrated as plug-ins and provide the mechanism for configuration and communication. Several components have been implemented sharing this technology. The dynamic behavior of the individual component is fully described by th...

  4. Application of Control System Studio for the NOνA Detector Control System

    International Nuclear Information System (INIS)

    Lukhanin, Gennadiy; Biery, Kurt; Foulkes, Stephen; Kowalkowski, Jim; Paterno, Marc; Rechenmacher, Ron; Frank, Martin; Hatzikoutelis, Athanasios

    2012-01-01

    In the NOνA experiment, the Detector Controls System (DCS) provides a method for controlling and monitoring important detector hardware and environmental parameters. It is essential for operating the detector and is required to have access to roughly 370,000 independent programmable channels via more than 11,600 physical devices. In this paper, we demonstrate an application of Control System Studio (CSS), developed by Oak Ridge National Laboratory, for the NOνA experiment. The application of CSS for the DCS of the NOνA experiment has been divided into three phases: (1) user requirements and concept prototype on a test-stand, (2) small scale deployment at the prototype Near Detector on the Surface, and (3) a larger scale deployment at the Far Detector. We also give an outline of the CSS integration with the NOνA online software and the alarm handling logic for the Front-End electronics.

  5. Information management system breadboard data acquisition and control system.

    Science.gov (United States)

    Mallary, W. E.

    1972-01-01

    Description of a breadboard configuration of an advanced information management system based on requirements for high data rates and local and centralized computation for subsystems and experiments to be housed on a space station. The system is to contain a 10-megabit-per-second digital data bus, remote terminals with preprocessor capabilities, and a central multiprocessor. A concept definition is presented for the data acquisition and control system breadboard, and a detailed account is given of the operation of the bus control unit, the bus itself, and the remote acquisition and control unit. The data bus control unit is capable of operating under control of both its own test panel and the test processor. In either mode it is capable of both single- and multiple-message operation in that it can accept a block of data requests or update commands for transmission to the remote acquisition and control unit, which in turn is capable of three levels of data-handling complexity.

  6. Failure Mode and Effect Analysis for remote handling transfer systems of ITER

    International Nuclear Information System (INIS)

    Pinna, T.; Caporali, R.; Tesini, A.

    2008-01-01

    A Failure Mode and Effect Analysis (FMEA) at component level was done to study safety-relevant implications arising from possible failures in performing remote handling (RH) operations at ITER facility . Autonomous air cushion transporter, pallet, sealed casks and tractor movers needed for port plug mounting/dismantling operation were analysed. For each sub-system, the breakdown of significant components was outlined and, for each component, possible failure modes have been investigated pointing out possible causes, possible actions to prevent the causes, consequences and actions to prevent or mitigate consequences. Off-normal events which may result in hazardous consequences to the public and the environment have been defined as Postulated Initiating Events (PIEs). Two safety-relevant PIEs have been defined by assessing elementary failures related to the analysed system. Each PIE has been discussed in order to qualitatively identify accident sequences arising from each of them. As an output of this FMEA study, possible incidental scenarios, where the intervention of rescue RH equipments is required to overcome critical situations determined by fault of RH components, were defined as well. Being rescue scenarios of main concern for ITER remote handling activities, such families could be helpful in defining the design requirements of port handling systems in general and on RH transfer system in particular. Furthermore, they could be useful in defining casks and vehicles to be used for rescue activities

  7. Proceedings of the 1. international conference on CANDU fuel handling systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Besides information on fuel loading and handling systems for CANDU and PHWR reactors, the 25 papers in these proceedings also include some on dry storage, modification to fuel strings at Bruce A, and on the SLAR (spacer location and repositioning) system for finding and moving garter springs. The individual papers have been abstracted separately.

  8. Proceedings of the 1. international conference on CANDU fuel handling systems

    International Nuclear Information System (INIS)

    1996-01-01

    Besides information on fuel loading and handling systems for CANDU and PHWR reactors, the 25 papers in these proceedings also include some on dry storage, modification to fuel strings at Bruce A, and on the SLAR (spacer location and repositioning) system for finding and moving garter springs. The individual papers have been abstracted separately

  9. The ATLAS detector control system

    International Nuclear Information System (INIS)

    Schlenker, S.; Arfaoui, S.; Franz, S.

    2012-01-01

    The ATLAS experiment is one of the multi-purpose experiments at the Large Hadron Collider (LHC), constructed to study elementary particle interactions in collisions of high-energy proton beams. Twelve different sub-detectors as well as the common experimental infrastructure are supervised by the Detector Control System (DCS). The DCS enables equipment supervision of all ATLAS sub-detectors by using a system of more that 130 server machines running the industrial SCADA product PVSS. This highly distributed system reads, processes and archives of the order of 10 6 operational parameters. Higher level control system layers allow for automatic control procedures, efficient error recognition and handling, and manage the communication with external systems such as the LHC. First, this contribution describes the status of the ATLAS DCS and the experience gained during the LHC commissioning and the first physics data taking operation period. Secondly, the future evolution and maintenance constraints for the coming years and the LHC high luminosity upgrades are outlined. (authors)

  10. The ATLAS Detector Control System

    CERN Document Server

    Schlenker, S; Kersten, S; Hirschbuehl, D; Braun, H; Poblaguev, A; Oliveira Damazio, D; Talyshev, A; Zimmermann, S; Franz, S; Gutzwiller, O; Hartert, J; Mindur, B; Tsarouchas, CA; Caforio, D; Sbarra, C; Olszowska, J; Hajduk, Z; Banas, E; Wynne, B; Robichaud-Veronneau, A; Nemecek, S; Thompson, PD; Mandic, I; Deliyergiyev, M; Polini, A; Kovalenko, S; Khomutnikov, V; Filimonov, V; Bindi, M; Stanecka, E; Martin, T; Lantzsch, K; Hoffmann, D; Huber, J; Mountricha, E; Santos, HF; Ribeiro, G; Barillari, T; Habring, J; Arabidze, G; Boterenbrood, H; Hart, R; Marques Vinagre, F; Lafarguette, P; Tartarelli, GF; Nagai, K; D'Auria, S; Chekulaev, S; Phillips, P; Ertel, E; Brenner, R; Leontsinis, S; Mitrevski, J; Grassi, V; Karakostas, K; Iakovidis, G.; Marchese, F; Aielli, G

    2011-01-01

    The ATLAS experiment is one of the multi-purpose experiments at the Large Hadron Collider (LHC), constructed to study elementary particle interactions in collisions of high-energy proton beams. Twelve different sub-detectors as well as the common experimental infrastructure are supervised by the Detector Control System (DCS). The DCS enables equipment supervision of all ATLAS sub-detectors by using a system of >130 server machines running the industrial SCADA product PVSS. This highly distributed system reads, processes and archives of the order of 106 operational parameters. Higher level control system layers allow for automatic control procedures, efficient error recognition and handling, and manage the communication with external systems such as the LHC. This contribution firstly describes the status of the ATLAS DCS and the experience gained during the LHC commissioning and the first physics data taking operation period. Secondly, the future evolution and maintenance constraints for the coming years an...

  11. Autonomous underwater handling system for service, measurement and cutting tasks for the decommissioning of nuclear facilities

    International Nuclear Information System (INIS)

    Hahn, M.; Haferkamp, H.; Bach, W.; Rose, N.

    1992-01-01

    For about 10 years the Institute for Material Science at the Hanover University has worked on projects of underwater cutting and welding. Increasing tasks to be done in nuclear facilities led to the development of special handling systems to support and handle the cutting tools. Also sensors and computers for extensive and complex tasks were integrated. A small sized freediving handling system, equipped with 2 video cameras, ultrasonic and radiation sensors and a plasma cutting torch for inspection and decommissioning tasks in nuclear facilities is described in this paper. (Author)

  12. Study and Evaluation of Innovative Fuel Handling Systems for Sodium-Cooled Fast Reactors: Fuel Handling Route Optimization

    Directory of Open Access Journals (Sweden)

    Franck Dechelette

    2014-01-01

    Full Text Available The research for technological improvement and innovation in sodium-cooled fast reactor is a matter of concern in fuel handling systems in a view to perform a better load factor of the reactor thanks to a quicker fuelling/defueling process. An optimized fuel handling route will also limit its investment cost. In that field, CEA has engaged some innovation study either of complete FHR or on the optimization of some specific components. This paper presents the study of three SFR fuel handling route fully described and compared to a reference FHR option. In those three FHR, two use a gas corridor to transfer spent and fresh fuel assembly and the third uses two casks with a sodium pot to evacuate and load an assembly in parallel. All of them are designed for the ASTRID reactor (1500 MWth but can be extrapolated to power reactors and are compatible with the mutualisation of one FHS coupled with two reactors. These three concepts are then intercompared and evaluated with the reference FHR according to four criteria: performances, risk assessment, investment cost, and qualification time. This analysis reveals that the “mixed way” FHR presents interesting solutions mainly in terms of design simplicity and time reduction. Therefore its study will be pursued for ASTRID as an alternative option.

  13. The CMS tracker control system

    Science.gov (United States)

    Dierlamm, A.; Dirkes, G. H.; Fahrer, M.; Frey, M.; Hartmann, F.; Masetti, L.; Militaru, O.; Shah, S. Y.; Stringer, R.; Tsirou, A.

    2008-07-01

    The Tracker Control System (TCS) is a distributed control software to operate about 2000 power supplies for the silicon modules of the CMS Tracker and monitor its environmental sensors. TCS must thus be able to handle about 104 power supply parameters, about 103 environmental probes from the Programmable Logic Controllers of the Tracker Safety System (TSS), about 105 parameters read via DAQ from the DCUs in all front end hybrids and from CCUs in all control groups. TCS is built on top of an industrial SCADA program (PVSS) extended with a framework developed at CERN (JCOP) and used by all LHC experiments. The logical partitioning of the detector is reflected in the hierarchical structure of the TCS, where commands move down to the individual hardware devices, while states are reported up to the root which is interfaced to the broader CMS control system. The system computes and continuously monitors the mean and maximum values of critical parameters and updates the percentage of currently operating hardware. Automatic procedures switch off selected parts of the detector using detailed granularity and avoiding widespread TSS intervention.

  14. Development of high intensity beam handling system, 4

    International Nuclear Information System (INIS)

    Yamanoi, Yutaka; Tanaka, Kazuhiro; Minakawa, Michifumi

    1992-01-01

    We have constructed the new counter experimental hall at the KEK 12 GeV Proton Synchrotron (KEK-PS) in order to handle high intensity primary proton beams of up to 1x10 3 pps (protons per second), which is one order of magnitude greater than the present beam intensity of the KEK-PS, 1x10 12 pps. New technologies for handling high-intensity beams have, then, been developed and employed in the construction of the new hall. A part of our R/D work on handling high intensity beams will be reported. (author)

  15. Integrated digital control and man-machine interface for complex remote handing systems

    International Nuclear Information System (INIS)

    Rowe, J.C.; Spille, R.F.; Zimmermann, S.D.

    1987-01-01

    The Advanced Integrated Maintenance System (AIMS) is part of a continuing effort within the Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory to develop and extend the capabilities of remote manipulation and maintenance technology. The AIMS is a totally integrated approach to remote handling in hazardous environments. State-of-the-art computer systems connected through a high-speed distributed control system that supports the flexibility and expandability needed for large integrated maintenance applications. A man-Machine Interface provides high-level human interaction through a powerful color graphics menu-controlled operator console. An auxiliary control system handles the real-time processing needs for a variety of support hardware. A pair of dedicated fiber-optic-linked master/slave computer systems control the Advanced Servomanipulator master/slave arms using powerful distributed digital processing methods. The FORTH language was used as a real-time operating and development environment for the entire system, and all of these components are integrated into a control room concept that represents the latest advancements in the development of remote maintenance facilities for hazardous environments

  16. Concept design of divertor remote handling system for the FAST machine

    Energy Technology Data Exchange (ETDEWEB)

    Di Gironimo, G., E-mail: giuseppe.digironimo@unina.it [Association Euratom/ENEA/CREATE, Università di Napoli Federico II, 80125 Napoli (Italy); Labate, C.; Renno, F. [Association Euratom/ENEA/CREATE, Università di Napoli Federico II, 80125 Napoli (Italy); Brolatti, G.; Crescenzi, F.; Crisanti, F. [CR ENEA Frascati, Via E. Fermi 27, Frascati (RM) (Italy); Lanzotti, A. [Association Euratom/ENEA/CREATE, Università di Napoli Federico II, 80125 Napoli (Italy); Lucca, F. [LT Calcoli SaS, Piazza Prinetti 26/B, 23807 Merate (Italy); Siuko, M. [VTT Systems Engineering, Tekniikankatu 1, 33720 Tampere (Finland)

    2013-10-15

    The paper presents a concept design of a remote handling (RH) system oriented to maintenance operations on the divertor second cassette in FAST, a satellite of ITER tokamak. Starting from ITER configuration, a suitably scaled system, composed by a cassette multifunctional mover (CMM) connected to a second cassette end-effector (SCEE), can represent a very efficient solution for FAST machine. The presence of a further system able to open the divertor port, used for RH aims, and remove the first cassette, already aligned with the radial direction of the port, is presumed. Although an ITER-like system maintains essentially shape and proportions of its reference configuration, an appropriate arrangement with FAST environment is needed, taking into account new requirements due to different dimensions, weights and geometries. The use of virtual prototyping and the possibility to involve a great number of persons, not only mechanical designers but also physicist, plasma experts and personnel assigned to remote handling operations, made them to share the multiphysics design experience, according to a concurrent engineering approach. Nevertheless, according to the main objective of any satellite tokamak, such an approach benefits the study of enhancements to ITER RH system and the exploration of alternative solutions.

  17. Dynamic simulation of the NET In-Vessel Handling Unit

    International Nuclear Information System (INIS)

    Reim, J.

    1991-01-01

    During the conceptual design phase of the Next European Torus (NET) a large remote maintenance transporter system, the In-Vessel Handling Unit (IVHU), is being developed. It consists of an articulated boom with four rotational joints, which is mounted on a carrier outside the vessel. This boom will be able to carry master-slave manipulators or special work units. The engineering design is supported by dynamic computations. Main topics of the dynamic simulation are the evaluation of IVHU performance, selection and optimisation of the actuator design and of the control algorithms. This simulation task requires full three-dimensional modelling regarding structural elasticity and non-linear actuator dynamics. The Multibody dynamics of the transporter system are modelled with a commerical analysis package. Elastic links and a precise dynamic actuator model are introduced by applied forces, spring elements and differential equations. The actuator model comprises electric motors, gears and linear control algorithms. Non-linear effects which have an influence on control stability and accuracy are taken into account. Most important effects are backlash and static friction. The simulations concentrate on test and optimisation of the control layout and performance studies for critical remote handling tasks. Simulations for control layout and critical remote maintenance tasks correspond to the design objectives of the transporter system. (orig.)

  18. Lessons learned from the MIT Tara control and data system

    International Nuclear Information System (INIS)

    Gaudreau, M.P.J.; Sullivan, J.D.; Fredian, T.W.; Irby, J.H.; Karcher, C.A.; Rameriz, R.A.; Sevillano, E.; Stillerman, J.A.; Thomas, P.

    1987-10-01

    The control and data system of the MIT Tara Tandem Mirror has worked successfully throughout the lifetime of the experiment (1983 through 1987). As the Tara project winds down, it is appropriate to summarize the lessons learned from the implementation and operation of the control and data system over the years and in its final form. The control system handled ∼2400 I/0 points in real time throughout the 5 to 10 minute shot cycle while the data system, in near real time, handled ∼1000 signals with a total of 5 to 7 Mbytes of data each shot. The implementation depended upon a consistent approach based on separating physics and engineering functions and on detailed functional diagrams with narrowly defined cross communication. This paper is a comprehensive treatment of the principal successes, residual problems, and dilemmas that arose from the beginning until the final hardware and software implementation. Suggestions for future systems of either similar size or of larger scale such as CIT are made in the conclusion. 11 refs., 1 fig

  19. Automated cassette-to-cassette substrate handling system

    Science.gov (United States)

    Kraus, Joseph Arthur; Boyer, Jeremy James; Mack, Joseph; DeChellis, Michael; Koo, Michael

    2014-03-18

    An automated cassette-to-cassette substrate handling system includes a cassette storage module for storing a plurality of substrates in cassettes before and after processing. A substrate carrier storage module stores a plurality of substrate carriers. A substrate carrier loading/unloading module loads substrates from the cassette storage module onto the plurality of substrate carriers and unloads substrates from the plurality of substrate carriers to the cassette storage module. A transport mechanism transports the plurality of substrates between the cassette storage module and the plurality of substrate carriers and transports the plurality of substrate carriers between the substrate carrier loading/unloading module and a processing chamber. A vision system recognizes recesses in the plurality of substrate carriers corresponding to empty substrate positions in the substrate carrier. A processor receives data from the vision system and instructs the transport mechanism to transport substrates to positions on the substrate carrier in response to the received data.

  20. Interim design status and operational report for semiremote handling fixtures: size reduction system

    International Nuclear Information System (INIS)

    Ballard, A.S.

    1977-02-01

    Crushing of HTGR fuel elements is accomplished by a three-stage crushing system consisting of two overhead eccentric jaw crushers, a double-roll crusher, and an oversize reduction system to ensure complete reduction to the desired size. The crushing system is mounted in a special framework which enables gravity flow, eliminates material transport, and minimizes material holdup. The system has been designated UNIFRAME because of the integrated nature of the equipment. This report addresses the demonstration of semiremote maintenance of the crusher in a nonradioactive environment. Although the crusher maintenance system has some remote handling capability inherent in its design, the scope of this initial program is limited to the handling of selected components and allows for manual assistance in certain circumstances. This mode of operation is designated semiremote maintenance and is intended as an effort to gather experience

  1. Can control banding be useful for the safe handling of nanomaterials? A systematic review

    Science.gov (United States)

    Eastlake, Adrienne; Zumwalde, Ralph; Geraci, Charles

    2016-06-01

    Control banding (CB) is a risk management strategy that has been used to identify and recommend exposure control measures to potentially hazardous substances for which toxicological information is limited. The application of CB and level of expertise required for implementation and management can differ depending on knowledge of the hazard potential, the likelihood of exposure, and the ability to verify the effectiveness of exposure control measures. A number of different strategies have been proposed for using CB in workplaces where exposure to engineered nanomaterials (ENMs) can occur. However, it is unclear if the use of CB can effectively reduce worker exposure to nanomaterials. A systematic review of studies was conducted to answer the question "can control banding be useful to ensure adequate controls for the safe handling of nanomaterials." A variety of databases were searched to identify relevant studies pertaining to CB. Database search terms included `control,' `hazard,' `exposure,' and `risk' banding as well as the use of these terms in the context of nanotechnology or nanomaterials. Other potentially relevant studies were identified during the review of articles obtained in the systematic review process. Identification of studies and the extraction of data were independently conducted by the reviewers. Quality of the studies was assessed using the methodological index for nonrandomized studies. The quality of the evidence was evaluated using grading of recommendations assessment, development and evaluation (GRADE). A total of 235 records were identified in the database search in which 70 records were determined to be eligible for full-text review. Only two studies were identified that met the inclusion criteria. These studies evaluated the application of the CB Nanotool in workplaces where ENMs were being handled. A total of 32 different nanomaterial handling activities were evaluated in these studies by comparing the recommended exposure controls using

  2. Design Package for Fuel Retrieval System Fuel Handling Tool Modification

    International Nuclear Information System (INIS)

    TEDESCHI, D.J.

    2000-01-01

    This is a design package that contains the details for a modification to a tool used for moving fuel elements during loading of MCO Fuel Baskets for the Fuel Retrieval System. The tool is called the fuel handling tool (or stinger). This document contains requirements, development design information, tests, and test reports

  3. A simulation-based approach for evaluating logging residue handling systems.

    Science.gov (United States)

    B. Bruce Bare; Benjamin A. Jayne; Brian F. Anholt

    1976-01-01

    Describes a computer simulation model for evaluating logging residue handling systems. The flow of resources is traced through a prespecified combination of operations including yarding, chipping, sorting, loading, transporting, and unloading. The model was used to evaluate the feasibility of converting logging residues to chips that could be used, for example, to...

  4. Criticality Safety Evaluation Report for the Cold Vacuum Drying (CVD) Facility's Process Water Handling System

    International Nuclear Information System (INIS)

    KESSLER, S.F.

    2000-01-01

    This report addresses the criticality concerns associated with process water handling in the Cold Vacuum Drying Facility. The controls and limitations on equipment design and operations to control potential criticality occurrences are identified

  5. Application of advanced handling techniques to transportation cask design

    International Nuclear Information System (INIS)

    Bennett, P.C.

    1992-01-01

    Sandia National Laboratories supports the US Department of Energy (DOE) Office of Civilian Radioactive Waste Management (OCRWM) applying technology to the safe transport of nuclear waste. Part of that development effort includes investigation of advanced handling technologies for automation of cask operations at nuclear waste receiving facilities. Although low radiation levels are expected near transport cask surfaces, cumulative occupational exposure at a receiving facility can be significant. Remote automated cask handling has the potential to reduce both the occupational exposure and the time necessary to process a cask. Thus, automated handling is consistent with DOE efforts to reduce the lifecycle costs of the waste disposal system and to maintain public and occupational radiological risks as low as reasonably achievable. This paper describes the development of advanced handling laboratory mock-ups and demonstrations for spent fuel casks. Utilizing the control enhancements described below, demonstrations have been carried out including cask location and identification, contact and non-contact surveys, impact limiter removal, tiedown release, uprighting, swing-free movement, gas sampling, and lid removal operations. Manually controlled movement around a cask under off-normal conditions has also been demonstrated

  6. Safe handling of tritium

    International Nuclear Information System (INIS)

    1991-01-01

    The main objective of this publication is to provide practical guidance and recommendations on operational radiation protection aspects related to the safe handling of tritium in laboratories, industrial-scale nuclear facilities such as heavy-water reactors, tritium removal plants and fission fuel reprocessing plants, and facilities for manufacturing commercial tritium-containing devices and radiochemicals. The requirements of nuclear fusion reactors are not addressed specifically, since there is as yet no tritium handling experience with them. However, much of the material covered is expected to be relevant to them as well. Annex III briefly addresses problems in the comparatively small-scale use of tritium at universities, medical research centres and similar establishments. However, the main subject of this publication is the handling of larger quantities of tritium. Operational aspects include designing for tritium safety, safe handling practice, the selection of tritium-compatible materials and equipment, exposure assessment, monitoring, contamination control and the design and use of personal protective equipment. This publication does not address the technologies involved in tritium control and cleanup of effluents, tritium removal, or immobilization and disposal of tritium wastes, nor does it address the environmental behaviour of tritium. Refs, figs and tabs

  7. An overview of process instrumentation, protective safety interlocks and alarm system at the JET facilities active gas handling system

    International Nuclear Information System (INIS)

    Skinner, N.; Brennan, P.; Brown, K.; Gibbons, C.; Jones, G.; Knipe, S.; Manning, C.; Perevezentsev, A.; Stagg, R.; Thomas, R.; Yorkshades, J.

    2003-01-01

    The Joint European Torus (JET) Facilities Active Gas Handling System (AGHS) comprises ten interconnected processing sub-systems that supply, process and recover tritium from gases used in the JET Machine. Operations require a diverse range of process instrumentation to carry out a multiplicity of monitoring and control tasks and approximately 500 process variables are measured. The different types and application of process instruments are presented with specially adapted or custom-built versions highlighted. Forming part of the Safety Case for tritium operations, a dedicated hardwired interlock and alarm system provides an essential safety function. In the event of failure modes, each hardwired interlock will back-up software interlocks and shutdown areas of plant to a failsafe condition. Design of the interlock and alarm system is outlined and general methodology described. Practical experience gained during plant operations is summarised and the methods employed for routine functional testing of essential instrument systems explained

  8. A New Control System Software for SANS BATAN Spectrometer in Serpong, Indonesia

    International Nuclear Information System (INIS)

    Bharoto; Putra, Edy Giri Rachman

    2010-01-01

    The original main control system of the 36 meter small-angle neutron scattering (SANS) BATAN Spectrometer (SMARTer) has been replaced with the new ones due to the malfunction of the main computer. For that reason, a new control system software for handling all the control systems was also developed in order to put the spectrometer back in operation. The developed software is able to control the system such as rotation movement of six pinholes system, vertical movement of four neutron guide system with the total length of 16.5 m, two-directional movement of a neutron beam stopper, forward-backward movement of a 2D position sensitive detector (2D-PSD) along 16.7 m, etc. A Visual Basic language program running on Windows operating system was employed to develop the software and it can be operated by other remote computers in the local area network. All device positions and command menu are displayed graphically in the main monitor or window and each device control can be executed by clicking the control button. Those advantages are necessary required for developing a new user-friendly control system software. Finally, the new software has been tested for handling a complete SANS experiment and it works properly.

  9. Conceptual design report for a Fusion Engineering Device sector-handling machine and movable manipulator system

    International Nuclear Information System (INIS)

    Watts, K.D.; Masson, L.S.; McPherson, R.S.

    1982-10-01

    Design requirements, trade studies, design descriptions, conceptual designs, and cost estimates have been completed for the Fusion Engineering Device sector handling machine, movable manipulator system, subcomponent handling machine, and limiter blade handling machine. This information will be used by the Fusion Engineering Design Center to begin to determine the cost and magnitude of the effort required to perform remote maintenance on the Fusion Engineering Device. The designs presented are by no means optimum, and the costs estimates are rough-order-of-magnitude

  10. Remote Handled Transuranic Sludge Retrieval Transfer And Storage System At Hanford

    International Nuclear Information System (INIS)

    Raymond, Rick E.; Frederickson, James R.; Criddle, James; Hamilton, Dennis; Johnson, Mike W.

    2012-01-01

    This paper describes the systems developed for processing and interim storage of the sludge managed as remote-handled transuranic (RH-TRU). An experienced, integrated CH2M HILL/AFS team was formed to design and build systems to retrieve, interim store, and treat for disposal the K West Basin sludge, namely the Sludge Treatment Project (STP). A system has been designed and is being constructed for retrieval and interim storage, namely the Engineered Container Retrieval, Transfer and Storage System (ECRTS)

  11. Remote Handled Transuranic Sludge Retrieval Transfer And Storage System At Hanford

    Energy Technology Data Exchange (ETDEWEB)

    Raymond, Rick E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Frederickson, James R. [AREVA, Avignon (France); Criddle, James [AREVA, Avignon (France); Hamilton, Dennis [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Johnson, Mike W. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2012-10-18

    This paper describes the systems developed for processing and interim storage of the sludge managed as remote-handled transuranic (RH-TRU). An experienced, integrated CH2M HILL/AFS team was formed to design and build systems to retrieve, interim store, and treat for disposal the K West Basin sludge, namely the Sludge Treatment Project (STP). A system has been designed and is being constructed for retrieval and interim storage, namely the Engineered Container Retrieval, Transfer and Storage System (ECRTS).

  12. Analysis and design of robust decentralized controllers for nonlinear systems

    Energy Technology Data Exchange (ETDEWEB)

    Schoenwald, D.A.

    1993-07-01

    Decentralized control strategies for nonlinear systems are achieved via feedback linearization techniques. New results on optimization and parameter robustness of non-linear systems are also developed. In addition, parametric uncertainty in large-scale systems is handled by sensitivity analysis and optimal control methods in a completely decentralized framework. This idea is applied to alleviate uncertainty in friction parameters for the gimbal joints on Space Station Freedom. As an example of decentralized nonlinear control, singular perturbation methods and distributed vibration damping are merged into a control strategy for a two-link flexible manipulator.

  13. Remote handling in ZEPHYR

    International Nuclear Information System (INIS)

    Andelfinger, C.; Lackner, E.; Ulrich, M.; Weber, G.; Schilling, H.B.

    1982-04-01

    A conceptual design of the ZEPHYR building is described. The listed radiation data show that remote handling devices will be necessary in most areas of the building. For difficult repair and maintenance works it is intended to transfer complete units from the experimental hall to a hot cell which provides better working conditions. The necessary crane systems and other transport means are summarized as well as suitable commercially available manipulators and observation devices. The conept of automatic devices for cutting and welding and other operations inside the vacuum vessel and the belonging position control system is sketched. Guidelines for the design of passive components are set up in order to facilitate remote operation. (orig.)

  14. Control system and environmental parameters monitoring of the Tandetron Accelerator clean room

    International Nuclear Information System (INIS)

    Mejia V, M.E.; Garcia H, J.M.; Flores M, J.

    2007-01-01

    A control system and monitoring of humidity and temperature implemented by means of a system based on a microcontroller, an intelligent sensor and a stage of power for the actuators handling is described. The change of the levels of reference of the control system and the monitoring of the physical controlled variables can be carried out from any connected computer to a local net or Internet. (Author)

  15. Handle system integration as an enabler in an internet of things smart environment

    CSIR Research Space (South Africa)

    Coetzee, L

    2012-06-01

    Full Text Available . The existing main components of the demonstrator are: ? BeachComber: a bearer-agnostic event-driven platform able to receive and send messages via numerous channels (Butgereit & Coetzee, 2011). ? ThingMemory: an enterprise-scale application where a cyber...-hardware platform linked to a number of different sensors and actuators. ? HandleProxy: a newly-created building block acting as proxy to the Handle System. ? Runtime configurable decision engine (embedded within ThingMemory) that, based on received information...

  16. Material handling systems for use in glovebox lines: A survey of Department of Energy facility experience

    International Nuclear Information System (INIS)

    Teese, G.D.; Randall, W.J.

    1992-01-01

    The Nuclear Weapons Complex Reconfiguration Study has recommended that a new manufacturing facility be constructed to replace the Rocky Flats Plant. In the new facility, use of an automated material handling system for movement of components would reduce both the cost and radiation exposure associated with production and maintenance operations. Contamination control would be improved between process steps through the use of airlocks and portals. Part damage associated with improper transport would be reduced, and accountability would be increased. In-process workpieces could be stored in a secure vault, awaiting a request for parts at a production station. However, all of these desirable features rely on the proper implementation of an automated material handling system. The Department of Energy Weapons Production Complex has experience with a variety of methods for transporting discrete parts in glovebox lines. The authors visited several sites to evaluate the existing technologies for their suitability for the application of plutonium manufacturing. Technologies reviewed were Linear motors, belt conveyors, roller conveyors, accumulating roller conveyors, pneumatic transport, and cart systems. The sites visited were The Idaho National Engineering laboratory, the Hanford Site, and the Rocky Flats Plant. Linear motors appear to be the most promising technology observed for the movement of discrete parts, and further investigation is recommended

  17. Application Examples for Handle System Usage

    Science.gov (United States)

    Toussaint, F.; Weigel, T.; Thiemann, H.; Höck, H.; Stockhause, M.; Lautenschlager, M.

    2012-12-01

    Besides the well-known DOI (Digital Object Identifiers) as a special form of Handles that resolve to scientific publications there are various other applications in use. Others perhaps are just not yet. We present some examples for the existing ones and some ideas for the future. The national German project C3-Grid provides a framework to implement a first solution for provenance tracing and explore unforeseen implications. Though project-specific, the high-level architecture is generic and represents well a common notion of data derivation. Users select one or many input datasets and a workflow software module (an agent in this context) to execute on the data. The output data is deposited in a repository to be delivered to the user. All data is accompanied by an XML metadata document. All input and output data, metadata and the workflow module receive Handles and are linked together to establish a directed acyclic graph of derived data objects and involved agents. Data that has been modified by a workflow module is linked to its predecessor data and the workflow module involved. Version control systems such as svn or git provide Internet access to software repositories using URLs. To refer to a specific state of the source code of for instance a C3 workflow module, it is sufficient to reference the URL to the svn revision or git hash. In consequence, individual revisions and the repository as a whole receive PIDs. Moreover, the revision specific PIDs are linked to their respective predecessors and become part of the provenance graph. Another example for usage of PIDs in a current major project is given in EUDAT (European Data Infrastructure) which will link scientific data of several research communities together. In many fields it is necessary to provide data objects at multiple locations for a variety of applications. To ensure consistency, not only the master of a data object but also its copies shall be provided with a PID. To verify transaction safety and to

  18. Fuzzy Backstepping Sliding Mode Control for Mismatched Uncertain System

    Directory of Open Access Journals (Sweden)

    H. Q. Hou

    2014-06-01

    Full Text Available Sliding mode controllers have succeeded in many control problems that the conventional control theories have difficulties to deal with; however it is practically impossible to achieve high-speed switching control. Therefore, in this paper an adaptive fuzzy backstepping sliding mode control scheme is derived for mismatched uncertain systems. Firstly fuzzy sliding mode controller is designed using backstepping method based on the Lyapunov function approach, which is capable of handling mismatched problem. Then fuzzy sliding mode controller is designed using T-S fuzzy model method, it can improve the performance of the control systems and their robustness. Finally this method of control is applied to nonlinear system as a case study; simulation results are also provided the performance of the proposed controller.

  19. NBS/LANL racetrack microtron control system

    International Nuclear Information System (INIS)

    Ayres, R.L.; Martin, E.R.; Trout, R.E.; Wilson, B.L.; Yoder, N.R.

    1985-01-01

    The distributed intelligence control system for the NBS/LANL racetrack microtron (RTM) is now nearing completion, with all major subsystems implemented and tested, thus providing some operating experience with most of the control system innovations. These include a triple hierarchy of microprocessor-based control elements, consisting of a primary control station and multiple secondary and tertiary control stations; light-link coupling to a tertiary station which operates at a 100 kV potential; a common database shared by separate microprocessors for handling hardware control and operator interactions; and joy stick control of the entire system. A unique secondary station interpreter program was used to great advantage for testing and checkout of various control and monitoring subsystems. The hardware design of the control system is based on Multibus I crates containing commercial Multibus I boards and a few custom designed boards. The primary-secondary data link is a high speed, bidirectional, full-duplex, 8-bit, ''byte'' parallel link designed for this application. This link permits very fast updating of the monitored data (> 5 per second) and timely response to operator control inputs at the primary station

  20. Power control system for a hot gas engine

    Science.gov (United States)

    Berntell, John O.

    1986-01-01

    A power control system for a hot gas engine of the type in which the power output is controlled by varying the mean pressure of the working gas charge in the engine has according to the present invention been provided with two working gas reservoirs at substantially different pressure levels. At working gas pressures below the lower of said levels the high pressure gas reservoir is cut out from the control system, and at higher pressures the low pressure gas reservoir is cut out from the system, thereby enabling a single one-stage compressor to handle gas within a wide pressure range at a low compression ratio.

  1. Advanced dust monitoring system applied to new TRU handling facility of JAERI

    International Nuclear Information System (INIS)

    Yabuta, H.; Shigeta, Y.; Sawahata, K.; Hasegawa, K.

    1993-01-01

    In JAERI, a large, scale multipurpose facility is under construction, which consists of a TRU waste management testing installation, a solution fuel treatment installation and critical assemblies with uranium and/or plutonium solution fuel. The facility is also equipped with a lot of gloveboxes for handling and treatment of solution fuel and hot cells for research on reprocessing process. As there may be a relatively high potential of air contamination, it is important to monitor air contamination effectively and efficiently. An advanced dust monitoring system was introduced for convenience of handling and automatical measurement of filter papers, by developing a filter-holder with an IC memory and a radioactivity measuring device with an automatic filter-holder changing mechanism as a part of a centralized monitoring system with a computer

  2. Handling Occlusions for Robust Augmented Reality Systems

    Directory of Open Access Journals (Sweden)

    Maidi Madjid

    2010-01-01

    Full Text Available Abstract In Augmented Reality applications, the human perception is enhanced with computer-generated graphics. These graphics must be exactly registered to real objects in the scene and this requires an effective Augmented Reality system to track the user's viewpoint. In this paper, a robust tracking algorithm based on coded fiducials is presented. Square targets are identified and pose parameters are computed using a hybrid approach based on a direct method combined with the Kalman filter. An important factor for providing a robust Augmented Reality system is the correct handling of targets occlusions by real scene elements. To overcome tracking failure due to occlusions, we extend our method using an optical flow approach to track visible points and maintain virtual graphics overlaying when targets are not identified. Our proposed real-time algorithm is tested with different camera viewpoints under various image conditions and shows to be accurate and robust.

  3. Can control banding be useful for the safe handling of nanomaterials? A systematic review

    International Nuclear Information System (INIS)

    Eastlake, Adrienne; Zumwalde, Ralph; Geraci, Charles

    2016-01-01

    Control banding (CB) is a risk management strategy that has been used to identify and recommend exposure control measures to potentially hazardous substances for which toxicological information is limited. The application of CB and level of expertise required for implementation and management can differ depending on knowledge of the hazard potential, the likelihood of exposure, and the ability to verify the effectiveness of exposure control measures. A number of different strategies have been proposed for using CB in workplaces where exposure to engineered nanomaterials (ENMs) can occur. However, it is unclear if the use of CB can effectively reduce worker exposure to nanomaterials. A systematic review of studies was conducted to answer the question “can control banding be useful to ensure adequate controls for the safe handling of nanomaterials.” A variety of databases were searched to identify relevant studies pertaining to CB. Database search terms included ‘control,’ ‘hazard,’ ‘exposure,’ and ‘risk’ banding as well as the use of these terms in the context of nanotechnology or nanomaterials. Other potentially relevant studies were identified during the review of articles obtained in the systematic review process. Identification of studies and the extraction of data were independently conducted by the reviewers. Quality of the studies was assessed using the methodological index for nonrandomized studies. The quality of the evidence was evaluated using grading of recommendations assessment, development and evaluation (GRADE). A total of 235 records were identified in the database search in which 70 records were determined to be eligible for full-text review. Only two studies were identified that met the inclusion criteria. These studies evaluated the application of the CB Nanotool in workplaces where ENMs were being handled. A total of 32 different nanomaterial handling activities were evaluated in these studies by comparing the recommended

  4. Can control banding be useful for the safe handling of nanomaterials? A systematic review

    Energy Technology Data Exchange (ETDEWEB)

    Eastlake, Adrienne, E-mail: aeastlake@cdc.gov [National Institute for Occupational Safety and Health, Nanotechnology Research Center (United States); Zumwalde, Ralph [RCS Corporation (United States); Geraci, Charles [National Institute for Occupational Safety and Health, Nanotechnology Research Center (United States)

    2016-06-15

    Control banding (CB) is a risk management strategy that has been used to identify and recommend exposure control measures to potentially hazardous substances for which toxicological information is limited. The application of CB and level of expertise required for implementation and management can differ depending on knowledge of the hazard potential, the likelihood of exposure, and the ability to verify the effectiveness of exposure control measures. A number of different strategies have been proposed for using CB in workplaces where exposure to engineered nanomaterials (ENMs) can occur. However, it is unclear if the use of CB can effectively reduce worker exposure to nanomaterials. A systematic review of studies was conducted to answer the question “can control banding be useful to ensure adequate controls for the safe handling of nanomaterials.” A variety of databases were searched to identify relevant studies pertaining to CB. Database search terms included ‘control,’ ‘hazard,’ ‘exposure,’ and ‘risk’ banding as well as the use of these terms in the context of nanotechnology or nanomaterials. Other potentially relevant studies were identified during the review of articles obtained in the systematic review process. Identification of studies and the extraction of data were independently conducted by the reviewers. Quality of the studies was assessed using the methodological index for nonrandomized studies. The quality of the evidence was evaluated using grading of recommendations assessment, development and evaluation (GRADE). A total of 235 records were identified in the database search in which 70 records were determined to be eligible for full-text review. Only two studies were identified that met the inclusion criteria. These studies evaluated the application of the CB Nanotool in workplaces where ENMs were being handled. A total of 32 different nanomaterial handling activities were evaluated in these studies by comparing the recommended

  5. Rotorcraft system identification techniques for handling qualities and stability and control evaluation

    Science.gov (United States)

    Hall, W. E., Jr.; Gupta, N. K.; Hansen, R. S.

    1978-01-01

    An integrated approach to rotorcraft system identification is described. This approach consists of sequential application of (1) data filtering to estimate states of the system and sensor errors, (2) model structure estimation to isolate significant model effects, and (3) parameter identification to quantify the coefficient of the model. An input design algorithm is described which can be used to design control inputs which maximize parameter estimation accuracy. Details of each aspect of the rotorcraft identification approach are given. Examples of both simulated and actual flight data processing are given to illustrate each phase of processing. The procedure is shown to provide means of calibrating sensor errors in flight data, quantifying high order state variable models from the flight data, and consequently computing related stability and control design models.

  6. The integrated manual and automatic control of complex flight systems

    Science.gov (United States)

    Schmidt, David K.

    1991-01-01

    Research dealt with the general area of optimal flight control synthesis for manned flight vehicles. The work was generic; no specific vehicle was the focus of study. However, the class of vehicles generally considered were those for which high authority, multivariable control systems might be considered, for the purpose of stabilization and the achievement of optimal handling characteristics. Within this scope, the topics of study included several optimal control synthesis techniques, control-theoretic modeling of the human operator in flight control tasks, and the development of possible handling qualities metrics and/or measures of merit. Basic contributions were made in all these topics, including human operator (pilot) models for multi-loop tasks, optimal output feedback flight control synthesis techniques; experimental validations of the methods developed, and fundamental modeling studies of the air-to-air tracking and flared landing tasks.

  7. The CMS tracker control system

    International Nuclear Information System (INIS)

    Dierlamm, A; Dirkes, G H; Fahrer, M; Frey, M; Hartmann, F; Masetti, L; Militaru, O; Shah, S Y; Stringer, R; Tsirou, A

    2008-01-01

    The Tracker Control System (TCS) is a distributed control software to operate about 2000 power supplies for the silicon modules of the CMS Tracker and monitor its environmental sensors. TCS must thus be able to handle about 10 4 power supply parameters, about 10 3 environmental probes from the Programmable Logic Controllers of the Tracker Safety System (TSS), about 10 5 parameters read via DAQ from the DCUs in all front end hybrids and from CCUs in all control groups. TCS is built on top of an industrial SCADA program (PVSS) extended with a framework developed at CERN (JCOP) and used by all LHC experiments. The logical partitioning of the detector is reflected in the hierarchical structure of the TCS, where commands move down to the individual hardware devices, while states are reported up to the root which is interfaced to the broader CMS control system. The system computes and continuously monitors the mean and maximum values of critical parameters and updates the percentage of currently operating hardware. Automatic procedures switch off selected parts of the detector using detailed granularity and avoiding widespread TSS intervention

  8. Trends in Modern Exception Handling

    Directory of Open Access Journals (Sweden)

    Marcin Kuta

    2003-01-01

    Full Text Available Exception handling is nowadays a necessary component of error proof information systems. The paper presents overview of techniques and models of exception handling, problems connected with them and potential solutions. The aspects of implementation of propagation mechanisms and exception handling, their effect on semantics and general program efficiency are also taken into account. Presented mechanisms were adopted to modern programming languages. Considering design area, formal methods and formal verification of program properties we can notice exception handling mechanisms are weakly present what makes a field for future research.

  9. The crane handling system for 500 litre drums of cemented radioactive waste

    International Nuclear Information System (INIS)

    Staples, A.T.

    1991-01-01

    As part of the AEA Technology strategy for dealing with radioactive wastes new waste treatment facilities are being built at the Winfrith Technology Centre (WTC), Dorset. One of the facilities at WTC is the Treated Radwaste Store (TRS) which is designed to store sealed 500 litre capacity drums of treated waste for an interim period until the national disposal facility is operational. Within the TRS two cranes have been incorporated, one spanning the entire width and travelling the length of the Store. The second operates within the area designated for drum handling during inspection work. The development of the design of these cranes and their associated control systems, to meet the complex requirements of operations whilst also satisfying the reliability and safety criteria, is discussed within the paper. (author)

  10. Development and comparison of integrated dynamics control systems with fuzzy logic control and sliding mode control

    International Nuclear Information System (INIS)

    Song, Jeong Hoon

    2013-01-01

    In this study, four integrated dynamics control (IDC) systems abbreviated as IDCB, IDCS, IDCF, and IDCR are developed, evaluated and compared. IDC systems were integrated with brake and steer control systems to enhance lateral stability and handling performance. To construct the IDC systems, a vehicle model with fourteen degrees of freedom, a fuzzy logic controller, and a sliding mode ABS controller were used. They were tested with various steering inputs when excessive full brake pressure or no brake pressure was applied on dry asphalt, wet asphalt, a snow-covered paved road, and a split-µ road. The results showed that an IDC-equipped vehicle improved lateral stability and controllability in every driving condition compared to an ABS-equipped vehicle. Under all road conditions, IDC controllers enabled the yaw rate to follow the reference yaw rate almost perfectly and reduced the body slip angle. On a split-µ road, IDCB, IDCS, IDCF, and IDCR vehicles drove straight ahead with only very small deviations.

  11. Preference Handling for Artificial Intelligence

    OpenAIRE

    Goldsmith, Judy; University of Kentucky; Junker, Ulrich; ILOG

    2009-01-01

    This article explains the benefits of preferences for AI systems and draws a picture of current AI research on preference handling. It thus provides an introduction to the topics covered by this special issue on preference handling.

  12. Can Control Banding be Useful for the Safe Handling of Nanomaterials? A Systematic Review

    Science.gov (United States)

    Eastlake, Adrienne; Zumwalde, Ralph; Geraci, Charles

    2016-01-01

    Objectives Control banding (CB) is a risk management strategy that has been used to identify and recommend exposure control measures to potentially hazardous substances for which toxicological information is limited. The application of CB and level of expertise required for implementation and management can differ depending on knowledge of the hazard potential, the likelihood of exposure, and the ability to verify the effectiveness of exposure control measures. A number of different strategies have been proposed for using CB in workplaces where exposure to engineered nanomaterials (ENMs) can occur. However, it is unclear if the use of CB can effectively reduce worker exposure to nanomaterials. A systematic review of studies was conducted to answer the question “can control banding be useful to ensure adequate controls for the safe handling of nanomaterials.” Methods A variety of databases were searched to identify relevant studies pertaining to CB. Database search terms included ‘control’, ‘hazard’, ‘exposure’ and ‘risk’ banding as well as the use of these terms in the context of nanotechnology or nanomaterials. Other potentially relevant studies were identified during the review of articles obtained in the systematic review process. Identification of studies and the extraction of data were independently conducted by the reviewers. Quality of the studies was assessed using the Methodological Index for Non-Randomized Studies (MINORS). The quality of the evidence was evaluated using Grading of Recommendations Assessment, Development and Evaluation (GRADE). Results A total of 235 records were identified in the database search in which 70 records were determined to be eligible for full-text review. Only two studies were identified that met the inclusion criteria. These studies evaluated the application of the CB Nanotool in workplaces where ENMs were being handled. A total of 32 different nanomaterial handling activities were evaluated in these

  13. A model for transfer baggage handling at airports

    DEFF Research Database (Denmark)

    Barth, Torben C.; Timler Holm, Janus; Lindorff Larsen, Jakob

    This work deals with the handling of baggage from passengers changing aircraft at an airport. The transfer baggage problem is to assign the bags from each arriving aircraft to an infeed area into the airport infrastructure. The infrastructure will then distribute the bags to the handling faciliti...... is studied and future approaches for improving robustness are discussed. The presented solution approach runs successfully as part of the operation control systems at Frankfurt Airport since 2008.......This work deals with the handling of baggage from passengers changing aircraft at an airport. The transfer baggage problem is to assign the bags from each arriving aircraft to an infeed area into the airport infrastructure. The infrastructure will then distribute the bags to the handling facilities...... and robustness. The model can be solved with a commercial MIP-solver. Furthermore, the use of the model in the dynamic environment during daily operations is introduced. The model includes two different approaches for increasing the robustness of the generated solutions. The uncertainty of the input data...

  14. Control system at the Synchrotron Radiation Research Center

    International Nuclear Information System (INIS)

    Jan, G.J.

    1991-01-01

    A modern control system was designed for SRRC to control and monitor the facilities of storage ring, beam transport line and injection system. The SRRC control system is a distributed system which is divided into two logical levels. Several process computers and workstations at upper level provide the computing power for physics simulation, data storage and graphical user interfaces. VME-based Intelligent Local Controllers (ILC) are the backbone of the lower level system which handle the real time devices access and the closed loop control. Ethernet network provides the interconnection between these two layers using IEEE 802.3 and TCP/IP protocol. The software in upper level computers includes data base server, network server, simulation programs, various application codes and X windows based graphical user interfaces. Device drivers, application programs for devices control and communication programs are the major software components at the ILC level

  15. Monitoring with new microprocessor cuts cost of control system

    Energy Technology Data Exchange (ETDEWEB)

    Maehling, K L

    1985-08-01

    Programmable logic controllers (PLC) were originally developed as an alternative to relays, counters and timers for sequential and interlock control systems. They are now also used as part of distributive control systems which include diagnostic monitoring functions. The paper describes how a wiring scheme can be simplified and installation costs reduced by incorporating a newly-developed microprocessor-based monitoring device as an interface between remote devices and a PLC. An industrial application, the 400 tph coal handling facility at Bowater Southern Paper Co's mill in Calhoun, Tennessee, is considered. The control system design is outlined, the micro-monitor is described and the benefits of simplicity are stated in the paper.

  16. A state-of-the-art report on software operation structure of the digital control computer system

    International Nuclear Information System (INIS)

    Kim, Bong Kee; Lee, Kyung Hoh; Joo, Jae Yoon; Jang, Yung Woo; Shin, Hyun Kook

    1994-06-01

    CANDU Nuclear Power Plants including Wolsong 1 and 2/3/4 are controlled by a real-time plant control computer system. This report was written to provide an overview on the station control computer software which belongs to one of the most advanced real-time computing application area, along with the Fuel Handling Machine design concepts. The combination of well designed control computer and Fuel Handling Machine allow changing fuel bundles while the plant is in operation. Design methodologies and software structure are discussed along with the interface between the two systems. 29 figs., 2 tabs., 20 refs. (Author)

  17. A state-of-the-art report on software operation structure of the digital control computer system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Bong Kee; Lee, Kyung Hoh; Joo, Jae Yoon; Jang, Yung Woo; Shin, Hyun Kook [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-06-01

    CANDU Nuclear Power Plants including Wolsong 1 and 2/3/4 are controlled by a real-time plant control computer system. This report was written to provide an overview on the station control computer software which belongs to one of the most advanced real-time computing application area, along with the Fuel Handling Machine design concepts. The combination of well designed control computer and Fuel Handling Machine allow changing fuel bundles while the plant is in operation. Design methodologies and software structure are discussed along with the interface between the two systems. 29 figs., 2 tabs., 20 refs. (Author).

  18. Design and operation of a remotely operated plutonium waste size reduction and material handling process

    International Nuclear Information System (INIS)

    Stewart, J.A. III; Charlesworth, D.L.

    1986-01-01

    Noncombustible 238 Pu and 239 Pu waste is generated as a result of normal operation and decommissioning activity at the Savannah River Plant, and is being retrievably stored there. As part of the long-term plant to process the stored waste and current waste for permanent disposal, a remote size reduction and material handling process is being cold-tested at Savannah River Laboratory. The process consists of a large, low-speed shredder and material handling system, a remote worktable, a bagless transfer system, and a robotically controlled manipulator. Initial testing of the shredder and material handling system and a cycle test of the bagless transfer system has been completed. Fabrication and acceptance testing of the Telerobat, a robotically controlled manipulator has been completed. Testing is scheduled to begin in 3/86. Design features maximizing the ability to remotely maintain the equipment were incorporated. Complete cold-testing of the equipment is scheduled to be completed in 1987

  19. From the conceptual design to the first simulation of the new WEST plasma control system

    Energy Technology Data Exchange (ETDEWEB)

    Nouailletas, R., E-mail: remy.nouailletas@cea.fr [IRFM, CEA, F-13108 Saint Paul lez Durance (France); Ravenel, N.; Signoret, J. [IRFM, CEA, F-13108 Saint Paul lez Durance (France); Treutterer, W. [Max Planck Institute for Plasma Physics, Boltzmannstr. 2, 85748 Garching (Germany); Spring, A.; Lewerentz, M. [Max Planck Institute for Plasma Physics, Wendeksteinstr. 1, 17491 Greifswald (Germany); Rapson, C.J. [Max Planck Institute for Plasma Physics, Boltzmannstr. 2, 85748 Garching (Germany); Masand, H.; Dhongde, J. [Institute for Plasma Research (IPR), Near Indira Bridge, Bhat, Gandhinagar 382 428, Gujarat (India); Moreau, P.; Guillerminet, B.; Brémond, S.; Allegretti, L. [IRFM, CEA, F-13108 Saint Paul lez Durance (France); Raupp, G. [Max Planck Institute for Plasma Physics, Boltzmannstr. 2, 85748 Garching (Germany); Werner, A. [Max Planck Institute for Plasma Physics, Wendeksteinstr. 1, 17491 Greifswald (Germany); Saint Laurent, F.; Nardon, E. [IRFM, CEA, F-13108 Saint Paul lez Durance (France); Bhandarkar, M. [Institute for Plasma Research (IPR), Near Indira Bridge, Bhat, Gandhinagar 382 428, Gujarat (India)

    2015-10-15

    Highlights: • We propose an overview of the future control system of the Tore Supra in WEST configuration. • The control system will be based on DCS (Discharge Control System) of ASDEX Upgrade. • The Pulse Schedule Editor will be based on the experiment program editor of the future W7X facility. • The operation of this new system is illustrated by an example based on a simple plasma current/loop voltage control. - Abstract: The configuration of the Tore Supra WEST project leads to control challenges and event handling close to those of ITER from a plasma scenario point of view (X-point configuration, H mode, long duration pulse) and from a machine protection point of view (metallic environment). Based on previous conceptual studies and to meet the WEST requirements, a sub-project will implement a new plasma control system (PCS) and a new pulse schedule editor (PSE). The main idea is to use a segment approach to describe the pulse scheduling with a full integration of event handling both on the PCS and on the PSE. After detailed specification work, it has been shown that the real-time framework called DCS (Discharge Control System) which is currently used on ASDEX upgrade fulfills the requirements and could be integrated into the WEST global control infrastructure. For the PSE, the Xedit tool, developed for the future W7X facility, has been chosen. This contribution will begin by a short explanation of the concepts proposed for the control of the plasma and the handling of events during the plasma discharge. Then it will focus on the new centralized architecture of the new Tore Supra PCS and an operating principle example showing the efficiency of the approach to handle normal and off-normal events. This later point will illustrate the required modifications of DCS and Xedit to fit with the Tore Supra Control infrastructure.

  20. Study of ITER equatorial port plug handling system and vacuum sealing interface

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Jean-Pierre [Association Euratom CEA, CEA/DSM/IRFM, Cadarache, F-13108 Saint-Paul-lez-Durance (France)], E-mail: jean-pierre.martins@cea.fr; Doceul, Louis; Marol, Sebastien; Delchie, Elise [Association Euratom CEA, CEA/DSM/IRFM, Cadarache, F-13108 Saint-Paul-lez-Durance (France); Cordier, Jean-Jacques; Levesy, Bruno; Tesini, Alessandro [ITER International Organization, F-13108 Saint-Paul-lez-Durance cedex (France); Ciattaglia, Emanuela [EFDA CSU - Garching, Boltzmannstr. 2, D-85748 Garching (Germany); Tivey, Richard [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Gillier, Rene; Abbes, Christophe [GARLOCK - Sealing Technologies - 90, rue de la roche du Geai, F-42029 St-Etienne cedex 1 (France)

    2009-06-15

    In the field of the ITER port plug engineering and integration task, CEA has contributed to define proposals concerning the port plugs vacuum sealing interface with the vessel flange and the equatorial plug handling. The 2001 baseline vacuum flange sealing consisted of TIG welding of a 316L strip plate on to U shapes. This arrangement presented some issues like welding access, implementation of tools, lip consumption, complex local leak test, continuous leak checking. Therefore, an alternate sealing solution based on the use of metallic gaskets is proposed. The different technical aspects are discussed to explain how this design can simplify the maintenance and deal with safety and vacuum requirements. The design of the mechanical attachment and vacuum sealing of the plug has constantly evolved, but the associated remote handling equipment was not systematically reviewed. An update of the cask and maintenance procedure was studied in order to design it in accordance with the last generic plug flange design. This includes a concept of a gripping system that uses the plug flange bolting area and, to help the remote handling process, a cantilever assisting system is suggested to increase the reliability of the transfer operation between vacuum vessel and cask.

  1. Development of spent fuel remote handling technology

    International Nuclear Information System (INIS)

    Yoon, J. S.; Hong, H. D.; Kim, S. H.

    2004-02-01

    In this research, the remote handling technology is developed for the advanced spent fuel conditioning process which gives a possible solution to deal with the rapidly increasing spent fuels. In detail, a fuel rod slitting device is developed for the decladding of the spent fuel. A series of experiments has been performed to find out the optimal condition of the spent fuel voloxidation which converts the UO 2 pellet into U 3 O 8 powder. The design requirements of the ACP equipment for hot test is established by analysing the modular requirement, radiation hardening and thermal protection of the process equipment, etc. The prototype of the servo manipulator is developed. The manipulator has an excellent performance in terms of the payload to weight ratio that is 30 % higher than that of existing manipulators. To provide reliability and safety of the ACP, the 3 dimensional graphic simulator is developed. Using the simulator the remote handling operation is simulated and as a result, the optimal layout of ACP is obtained. The supervisory control system is designed to control and monitor the several different unit processes. Also the failure monitoring system is developed to detect the possible accidents of the reduction reactor

  2. Solution for remote handling in accelerator installations

    International Nuclear Information System (INIS)

    Burgerjon, J.J.; Ekberg, E.L.; Grisham, D.L.; Horne, R.A.; Meyer, R.E.; Flatau, C.R.; Wilson, K.B.

    1977-01-01

    A description is given of a remote-handling system designed for the Los Alamos Clinton P. Anderson Meson Physics Facility (LAMPF), versatile enough to be used in a variety of situations found around particle accelerators. The system consists of a bilateral (force-reflecting) servomanipulator installed on an articulated hydraulic boom. The boom also carries the necessary tools and observation devices. The whole slave unit can be moved by crane or truck to the area of operation. A control cable connects the slave unit with the control station, located at a safe distance in a trailer. Various stages of development as well as some operating experience are discussed

  3. Techniques for remote maintenance of in-cell material-handling system in the HFEF/N main cell

    International Nuclear Information System (INIS)

    Tobias, D.A.; Frickey, C.A.

    1975-01-01

    Operations in the main cell of HFEF/N have required development of remote handling equipment and unique techniques for maintaining the in-cell material-handling system. Specially designed equipment is used to remove a disabled crane or electromechanical manipulator bridge from its support rails and place it on floor stands for repair or maintenance. Support areas for the main cell, such as the spray chamber and hot repair area, provide essential decontamination, repair, and staging areas for the in-cell material-handling-system equipment and tools. A combined engineering and technical effort in upgrading existing master-slave manipulators has definitely reduced the requirements for their maintenance. The cell is primarily for postirradiation examination of LMFBR materials and fuel elements

  4. Handling And Safety Aspects Of Fiber Optic Laser Beam Delivery Systems

    Science.gov (United States)

    Schonborn, K.-H.; Wodrich, W.

    1988-06-01

    Using lasers for therapeutic applications is getting more and more accepted. In ophthalmology Ar-lasers for intraocular applications are quite common. The Nd:YAG-laser is used as a high power tool in connection with silica fibers for different extracorporal and intracorporal applications. The CO2-laser is the cutting laser, one problem being the beam transmission: The state of the art in fibers is not sufficient up to now. Because of the high power used safety against laser radiation hazard is of great importance. The safety in laser use is primarily dependent on the surgeons cautiousness, e.g. using laser protection goggels, observing that the spot of the aiming beam is present etc. On the other hand the laser and fiber system has to be inherently safe by appropriate technical means as far as possible. An additional aspect adding to safety is the handling: With easier system handling less attention of the surgeon is necessary for driving the apparatus. Thus he can concentrate on the patient and on the procedure. In considering the fiber system one important point in handling and safety is the coupling of the fiber to the laser head. The development philosophy in this coupling may be divided into two groups: - one is trying to use standard connectors which were initially developed for data transmission; - the other is using special connectors. One example of the first group is the guiding of the laser beam from the Ar-laser to the slit-lamp in ophtalmology. Here the well-known F-SMA connectors together with a special fiber with adapted numerical aperture are used. The advantage of such a system is the low price of the connector. For high power lasers such as the clinical Nd:YAG lasers with 40 to 150 W those connectors are not suitable. Up to now every laser manufacturer developed his own connector system in this field.

  5. Availability analysis of the ITER blanket remote handling system

    International Nuclear Information System (INIS)

    Maruyama, Takahito; Noguchi, Yuto; Takeda, Nobukazu; Kakudate, Satoshi

    2015-01-01

    The ITER blanket remote handling system (BRHS) is required to replace 440 blanket first wall panels in a two-year maintenance period. To investigate this capability, an availability analysis of the system was carried out. Following the analysis procedure defined by the ITER organization, the availability analysis consists of a functional analysis and a reliability block diagram analysis. In addition, three measures to improve availability were implemented: procurement of spare parts, in-vessel replacement of cameras, and simultaneous replacement of umbilical cables. The availability analysis confirmed those measures improve the availability and capability of the BRHS to replace 440 blanket first wall panels in two years. (author)

  6. Temperature Control System for Mushroom Dryer

    Science.gov (United States)

    Wibowo, I. A.; Indah, Nur; Sebayang, D.; Adam, N. H.

    2018-03-01

    The main problem in mushroom cultivation is the handling after the harvest. Drying is one technique to preserve the mushrooms. Traditionally, mushrooms are dried by sunshine which depends on the weather. This affects the quality of the dried mushrooms. Therefore, this paper proposes a system to provide an artificial drying for mushrooms in order to maintain their quality. The objective of the system is to control the mushroom drying process to be faster compared to the natural drying at an accurate and right temperature. A model of the mushroom dryer has been designed, built, and tested. The system comprises a chamber, heater, blower, temperature sensor and electronic control circuit. A microcontroller is used as the controller which is programmed to implement a bang-bang control that regulates the temperature of the chamber. A desired temperature is inputted as a set point of the control system. Temperature of 45 °C is chosen as the operational drying temperature. Several tests have been carried out to examine the performance of the system including drying speed, the effects of ambient conditions, and the effects of mushroom size. The results show that the system can satisfy the objective.

  7. A versatile system for the rapid collection, handling and graphics analysis of multidimensional data

    International Nuclear Information System (INIS)

    O'Brien, P.M.; Moloney, G.; O'Oconnor, A.; Legge, G.J.F.

    1991-01-01

    The paper discusses the performances of a versatile computerized system developed at the Microanalytical Research Centre of the Melbourne University, for handling multiparameter data that may arise from a variety of experiments - nuclear, accelerator mass spectrometry, microprobe elemental analysis or 3-D microtomography. Some of the most demanding requirements arise in the application of microprobes to quantitative elemental mapping and to microtomography. A system to handle data from such experiments had been under continuous development. It has been reprogramed to run on a DG DS7540 workstation. The whole system of software has been rewritten, greatly expanded and made much more powerful and faster, by use of modern computer technology - a VME bus computer with a real-time operating system and a RISC workstation running UNIX and the X-window environment

  8. CLASSIFICATION OF THE MGR WASTE HANDLING BUILDING VENTILATION SYSTEM

    International Nuclear Information System (INIS)

    J.A. Ziegler

    2000-01-01

    The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) waste handling building ventilation system structures, systems and components (SSCs) performed by the MGR Preclosure Safety and Systems Engineering Section. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMP 2000). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333P, ''Quality Assurance Requirements and Description'' (QARD) (DOE 2000). This QA classification incorporates the current MGR design and the results of the ''Design Basis Event Frequency and Dose Calculation for Site Recommendation'' (CRWMS M andO 2000a) and ''Bounding Individual Category 1 Design Basis Event Dose Calculation to Support Quality Assurance Classification'' (Gwyn 2000)

  9. Report on achievements of research and development of an automatic sewing system in fiscal 1985. Cloth handling technology; 1985 nendo jido hosei system no kenkyu kaihatsu seika hokokusho. Kiji handling gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-03-01

    This paper describes the cloth handling technology, extracted from the achievement report for fiscal 1985 on developing an automatic sewing system. Development, experiment and evaluation were made on prototype cloth holding modules of vertical type and horizontal type. For a cloth operation type module, a principle model was developed. The cloth holding technology has a number of problems to be solved in the future, including systematization and application conditions of the holding devices. In improving the function of sewing process positioning, problems in devices were extracted, and functions to be added were put in order. Basics of the concept for the pressing process positioning was made clear, examples of the process layout drawings were prepared, and weights by processes were measured and put in order to discuss the holding force. The handler was given redundancy, and constructed with seven shafts to make it capable of avoiding obstacles, thereby having reduced the weight and size by 15%. The calculation operating time in a servo control module was shortened. The basic design was completed on the specifications for a coordinated operation control system. Discussions were given on functions and specifications of different constituting modules as a study on formation of the system to transport flexible cloths. (NEDO)

  10. Enhanced wood fuel handling: market and design studies

    Energy Technology Data Exchange (ETDEWEB)

    Landen, R.; Rippengal, R.; Redman, A.N.

    1997-09-01

    This report examines the potential for the manufacture and sale of novel wood fuel handling systems as a means of addressing users' concerns regarding current capital costs and potential high labour costs of non-automated systems. The report considers fuel handling technology that is basically appropriate for wood-fired heating systems of between c.100kW and c.1MW maximum continuous rating. This report details work done by the project collaborators in order to: (1) assess the current status of wood fuel handling technology; (2) evaluate the market appetite for improved wood fuel handling technology; (3) derive capital costs which are acceptable to customers; (4) review design options; and (5) select one or more design options worthy of further development. The current status of wood fuel handling technology is determined, and some basic modelling to give guidance on acceptable capital costs of 100-1000kW wood fuel handling systems is undertaken. (author)

  11. Development of an automated guided vehicle controller using a systems engineering approach

    Directory of Open Access Journals (Sweden)

    Ferreira, Tremaine

    2016-08-01

    Full Text Available Automated guided vehicles (AGVs are widely used for transporting materials in industry and commerce. In this research, an intelligent AGV-based material-handling system was developed using a model- based systems engineering (MBSE approach. The core of the AGV, the controller, was designed in the system modelling language environment using Visual Paradigm software, and then implemented in the hardware. As the result, the AGV’s complex tasks of material handling, navigation, and communication were successfully accomplished and tested in the real industrial environment. The developed AGV is capable of towing trolleys with a weight of up to 200kg at walking speed. The AGV can be incorporated into an intelligent material-handling system with multiple autonomous vehicles and work stations, thus providing flexibility and reconfigurability for the whole manufacturing system. Ergonomic and safety aspects were also considered in the design of the AGV. A comprehensive safety system that is compliant with industrial standards was implemented.

  12. Fuel handling and storage systems in nuclear power plants

    International Nuclear Information System (INIS)

    1984-01-01

    The scope of this Guide includes the design of handling and storage facilities for fuel assemblies from the receipt of fuel into the nuclear power plant until the fuel departs from that plant. The unirradiated fuel considered in this Guide is assumed not to exhibit any significant level of radiation so that it can be handled without shielding or cooling. This Guide also gives limited consideration to the handling and storage of certain core components. While the general design and safety principles are discussed in Section 2 of this Guide, more specific design requirements for the handling and storage of fuel are given in detailed sections which follow the general design and safety principles. Further useful information is to be found in the IAEA Technical Reports Series No. 189 ''Storage, Handling and Movement of Fuel and Related Components at Nuclear Power Plants'' and No. 198 ''Guide to the Safe Handling of Radioactive Wastes at Nuclear Power Plants''. However, the scope of the Guide does not include consideration of the following: (1) The various reactor physics questions associated with fuel and absorber loading and unloading into the core; (2) The design aspects of preparation of the reactor for fuel loading (such as the removal of the pressure vessel head for a light water reactor) and restoration after loading; (3) The design of shipping casks; (4) Fuel storage of a long-term nature exceeding the design lifetime of the nuclear power plant; (5) Unirradiated fuel containing plutonium

  13. Development of tritium-handling technique

    International Nuclear Information System (INIS)

    Ohmura, Hiroshi; Hosaka, Akio; Okamoto, Takahumi

    1988-01-01

    The overview of developing activities for tritium-handling techniques in IHI are presented. To establish a fusion power plant, tritium handling is one of the key technologies. Recently in JAERI, conceptual design of FER (Fusion Experimental Reactor) has been carried out, and the FER system requires a processing system for a large amount of tritium. IHI concentrate on investigation of fuel gas purification, isotope separation and storage systems under contract with Toshiba Corporation. Design results of the systems and each components are reviewed. IHI has been developing fundamental handling techniques which are the ZrNi bed for hydrogen isotope storage and isotope separation by laser. The ZrNi bed with a tritium storage capacity of 1000 Ci has been constructed and recovery capability of the hydrogen isotope until 10 -4 Torr {0.013 Pa} was confirmed. In laser isotope separation, the optimum laser wave length has been determined. (author)

  14. Practices of Handling

    DEFF Research Database (Denmark)

    Ræbild, Ulla

    to touch, pick up, carry, or feel with the hands. Figuratively it is to manage, deal with, direct, train, or control. Additionally, as a noun, a handle is something by which we grasp or open up something. Lastly, handle also has a Nordic root, here meaning to trade, bargain or deal. Together all four...... meanings seem to merge in the fashion design process, thus opening up for an embodied engagement with matter that entails direction giving, organizational management and negotiation. By seeing processes of handling as a key fashion methodological practice, it is possible to divert the discourse away from...... introduces four ways whereby fashion designers apply their own bodies as tools for design; a) re-activating past garment-design experiences, b) testing present garment-design experiences c) probing for new garment-design experiences and d) design of future garment experiences by body proxy. The paper...

  15. Integrated Neural Flight and Propulsion Control System

    Science.gov (United States)

    Kaneshige, John; Gundy-Burlet, Karen; Norvig, Peter (Technical Monitor)

    2001-01-01

    This paper describes an integrated neural flight and propulsion control system. which uses a neural network based approach for applying alternate sources of control power in the presence of damage or failures. Under normal operating conditions, the system utilizes conventional flight control surfaces. Neural networks are used to provide consistent handling qualities across flight conditions and for different aircraft configurations. Under damage or failure conditions, the system may utilize unconventional flight control surface allocations, along with integrated propulsion control, when additional control power is necessary for achieving desired flight control performance. In this case, neural networks are used to adapt to changes in aircraft dynamics and control allocation schemes. Of significant importance here is the fact that this system can operate without emergency or backup flight control mode operations. An additional advantage is that this system can utilize, but does not require, fault detection and isolation information or explicit parameter identification. Piloted simulation studies were performed on a commercial transport aircraft simulator. Subjects included both NASA test pilots and commercial airline crews. Results demonstrate the potential for improving handing qualities and significantly increasing survivability rates under various simulated failure conditions.

  16. Resource checking and event handling within the W7-X segment control framework

    International Nuclear Information System (INIS)

    Laqua, Heike; Bluhm, Torsten; Heimann, Peter; Hennig, Christine; Kroiss, Hugo; Krom, Jon G.; Kühner, Georg; Lewerentz, Marc; Maier, Josef; Schacht, Jörg; Spring, Anett; Werner, Andreas; Zilker, Manfred

    2012-01-01

    Highlights: ► Support for steady state fusion experiments. ► Off-normal event handling. ► Plasma event driven control. - Abstract: ITER, Wendelstein 7-X, LHD, and TORE SUPRA are experimental facilities designed to lead the way to steady state fusion devices. These experiments require strategies to sustain a discharge in case of unforeseen events, e.g. heat overloads of plasma facing components or the failure of a plasma heating source. A recovery strategy is needed to get the discharge back for physics exploitation. For this purpose the W7-X segment control framework provides means for automated event detection along with options to formulate and initiate a recovery strategy. Besides handling of failures and degradation there are events that represent a desired plasma physical effect. An example for this kind of event is a transition to from Low to High-Confinement mode. These events indicate that a certain plasma state is reached and scientific examination can be altered thus enabling event-driven multiple experiments per discharge. Examples of both kinds of events will be presented and compared to other approaches in the community.

  17. New, clean handling process introduced to improve cable quality

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, C G

    1990-05-01

    The clean room system introduced by Canada Wire and Cable Limited in its Toronto plant for its cable manufacturing operation is described. While clean room technology is common in the food processing industry, optical and aerospace manufacturing processes, this is the first time it has been applied to wire and cable extrusion in North America. The purpose of the clean compound handling system is to prevent particle contamination in the shielding and cable insulation materials, as part of an effort to prevent premature underground electric cable failures. Two rooms are dedicated to handling different types of insulation compound, two are dedicated to receiving semi-conducting shielding material, and the fifth room functions as an air lock for the two insulation rooms. The atmosphere is highly regulated with programmable logic control. The air supply filters capture 99.97% of all particles 0.3 microns or larger. The system also maintains air temperature, relative humidity and static pressure. The life variability of cross-linked polyethylene primary distribution cable is dependant on five factors: material purity, extra clean compound handling, cable design, manufacturing process, and installation and operation practices. The clean room system is expected to result in cable that is more resistant to water treeing failures. 2 figs.

  18. Progress in the design, R and D and procurement preparation of the ITER Divertor Remote Handling System

    Energy Technology Data Exchange (ETDEWEB)

    Esqué, Salvador, E-mail: Salvador.Esque@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Hille, Carine van; Ranz, Roberto; Damiani, Carlo [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Palmer, Jim; Hamilton, David [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul-lez-Durance (France)

    2014-10-15

    Highlights: •The ITER Divertor Remote Handling System (DRHS) reference design is presented. •Different R and D activities that have contributed to the development and validation of the current reference design are reported. •The DRHS turns to be a unique system in terms of complexity due to size of the to-be-handled components, the novelty of the remote operations and the operational conditions. -- Abstract: The ITER Divertor Remote Handling System (DRHS) consists of a number of dedicated remote handling equipment and tooling that will provide the means to perform the exchange of the divertor system in a full-remote way. In order to achieve this objective the DRHS will need to perform a number of novel and complex remote operations in a contaminated and space-constrained environment, in rather poor lightening conditions. Fusion for Energy has recently launched the tendering phase for the in-kind procurement of the DRHS. The procurement is based on a set of system requirements and functional specifications supported by a reference design which are presented and discussed in this paper along with the main outcomes of the different R and D activities that have contributed to the development and validation of the current reference design.

  19. The Need for Intelligent Control of Space Power Systems

    Science.gov (United States)

    May, Ryan David; Soeder, James F.; Beach, Raymond F.; McNelis, Nancy B.

    2013-01-01

    As manned spacecraft venture farther from Earth, the need for reliable, autonomous control of vehicle subsystems becomes critical. This is particularly true for the electrical power system which is critical to every other system. Autonomy can not be achieved by simple scripting techniques due to the communication latency times and the difficulty associated with failures (or combinations of failures) that need to be handled in as graceful a manner as possible to ensure system availability. Therefore an intelligent control system must be developed that can respond to disturbances and failures in a robust manner and ensure that critical system loads are served and all system constraints are respected.

  20. Flexible path optimization for the Cask and Plug Remote Handling System in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Vale, Alberto, E-mail: avale@ipfn.ist.utl.pt [Instituto de Plasmas e Fusão Nuclear, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Fonte, Daniel; Valente, Filipe; Ferreira, João [Instituto de Plasmas e Fusão Nuclear, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Ribeiro, Isabel [Laboratório de Robótica e Sistemas em Engenharia e Ciência, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Gonzalez, Carmen [Fusion for Energy Agency (F4E), Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain)

    2013-10-15

    Highlights: ► Complementary approach for path optimization named free roaming that takes full advantage of the rhombic like kinematics of the Cask and Plug Remote Handling System (CPRHS). ► Possibility to find trajectories not possible in the past using the line guidance developed in a previous work, in particular when moving the Cask Transfer System (CTS) beneath the pallet or in rescue missions. ► Methodology that maximizes the common parts of different trajectories in the same level of ITER buildings. -- Abstract: The Cask and Plug Remote Handling System (CPRHS) provides the means for the remote transfer of in-vessel components and remote handling equipment between the Hot Cell Building and the Tokamak Building in ITER along pre-defined optimized trajectories. A first approach for CPRHS path optimization was previously proposed using line guidance as the navigation methodology to be adopted. This approach might not lead to feasible paths in new situations not considered during the previous work, as rescue operations. This paper addresses this problem by presenting a complementary approach for path optimization inspired in rigid body dynamics that takes full advantage of the rhombic like kinematics of the CPRHS. It also presents a methodology that maximizes the common parts of different trajectories in the same level of ITER buildings. The results gathered from 500 optimized trajectories are summarized. Conclusions and open issues are presented and discussed.

  1. ITER - torus vacuum pumping system remote handling issues

    International Nuclear Information System (INIS)

    Stringer, J.

    1992-11-01

    This report describes further design issues concerning remote maintenance of torus vacuum pumping systems options for ITER. The key issues under investigation in this report are flask support systems for valve seal exchange operations for the compound cryopump scheme and remote maintenance of a proposed multiple turbomolecular pump (TMP) system, an alternative ITER torus exhaust pumping option. Previous studies have shown that the overhead support methods for seal exchange flask equipment could malfunction due to valve/flask misalignment. A floor-mounted support system is described in this report. This scheme provides a more rigid support system for seal exchange operations. An alternative torus pumping system, based on the use of multiple TMPs, is studied from a remote maintenance standpoint. In this concept, centre distance spacing for pump/valve assemblies is too restrictive for remote maintenance. Recommendations are made for adequate spacing of these assemblies based on commercially-available 0.8 m and 1.0 m diameter valves. Fewer pumps will fit in this arrangement, which implies a need for larger TMPs. Pumps of this size are not commercially available. Other concerns regarding the servicing and storage of remote handling equipment in cells are also identified. (9 figs.)

  2. A computerized system for handling renal size measurements from urograms

    International Nuclear Information System (INIS)

    Claesson, I.; Jacobsson, B.F.; Riha, M.

    1987-01-01

    The size of a kidney, as measured on an urogram, is a sensitive indicator of renal damage in a child with urinary tract infection, and renal surface area correlates well with glomerular filtration rate. Sequential measurements can be invaluable in evaluating the efficacy of a regimen of treatment. A system utilizing a personal microcomputer has been developed to facilitate the measuring procedure and the handling and analysis of data. (orig.)

  3. 20 CFR 658.421 - Handling of JS-related complaints.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Handling of JS-related complaints. 658.421... ADMINISTRATIVE PROVISIONS GOVERNING THE JOB SERVICE SYSTEM Job Service Complaint System Federal Js Complaint System § 658.421 Handling of JS-related complaints. (a) No JS-related complaint shall be handled at the...

  4. Decoupling control of vehicle chassis system based on neural network inverse system

    Science.gov (United States)

    Wang, Chunyan; Zhao, Wanzhong; Luan, Zhongkai; Gao, Qi; Deng, Ke

    2018-06-01

    Steering and suspension are two important subsystems affecting the handling stability and riding comfort of the chassis system. In order to avoid the interference and coupling of the control channels between active front steering (AFS) and active suspension subsystems (ASS), this paper presents a composite decoupling control method, which consists of a neural network inverse system and a robust controller. The neural network inverse system is composed of a static neural network with several integrators and state feedback of the original chassis system to approach the inverse system of the nonlinear systems. The existence of the inverse system for the chassis system is proved by the reversibility derivation of Interactor algorithm. The robust controller is based on the internal model control (IMC), which is designed to improve the robustness and anti-interference of the decoupled system by adding a pre-compensation controller to the pseudo linear system. The results of the simulation and vehicle test show that the proposed decoupling controller has excellent decoupling performance, which can transform the multivariable system into a number of single input and single output systems, and eliminate the mutual influence and interference. Furthermore, it has satisfactory tracking capability and robust performance, which can improve the comprehensive performance of the chassis system.

  5. Handling encapsulated spent fuel in a geologic repository environment

    International Nuclear Information System (INIS)

    Ballou, L.B.

    1983-02-01

    In support of the Spent Fuel Test-Climate at the U.S. Department of Energy's Nevada Test Site, a spent-fuel canister handling system has been designed, deployed, and operated successfully during the past five years. This system transports encapsulated commercial spent-fuel assemblies between the packaging facility and the test site (approx. 100 km), transfers the canisters 420 m vertically to and from a geologic storage drift, and emplaces or retrieves the canisters from the storage holes in the floor of the drift. The spent-fuel canisters are maintained in a fully shielded configuration at all times during the handling cycle, permitting manned access at any time for response to any abnormal conditions. All normal operations are conducted by remote control, thus assuring as low as reasonably achievable exposures to operators; specifically, we have had no measurable exposure during 30 canister transfer operations. While not intended to be prototypical of repository handling operations, the system embodies a number of concepts, now demonstrated to be safe, reliable, and economical, which may be very useful in evaluating full-scale repository handling alternatives in the future. Among the potentially significant concepts are: Use of an integral shielding plug to minimize radiation streaming at all transfer interfaces. Hydraulically actuated transfer cask jacking and rotation features to reduce excavation headroom requirements. Use of a dedicated small diameter (0.5 m) drilled shaft for transfer between the surface and repository workings. A wire-line hoisting system with positive emergency braking device which travels with the load. Remotely activated grapples - three used in the system - which are insensitive to load orientation. Rail-mounted underground transfer vehicle operated with no personnel underground

  6. Evaluation of Four Bedside Test Systems for Card Performance, Handling and Safety.

    Science.gov (United States)

    Giebel, Felix; Picker, Susanne M; Gathof, Birgit S

    2008-01-01

    SUMMARY: OBJECTIVE: Pretransfusion ABO compatibility testing is a simple and required precaution against ABO-incompatible transfusion, which is one of the greatest threats in transfusion medicine. While distinct agglutination is most important for correct test interpretation, protection against infectious diseases and ease of handling are crucial for accurate test performance. Therefore, the aim of this study was to evaluate differences in test card design, handling, and user safety. DESIGN: Four different bedside test cards with pre-applied antibodies were evaluated by 100 medical students using packed red blood cells of different ABO blood groups. Criteria of evaluation were: agglutination, labelling, handling, and safety regarding possible user injuries. Criteria were rated subjectively according to German school notes ranging from 1 = very good to 6 = very bad/insufficient. RESULTS: Overall, all cards received very good/good marks. The ABO blood group was identified correctly in all cases. Three cards (no. 1, no. 3, no. 4) received statistically significant (p labelling (1.5 vs. 2.2-2.4), handling (1.9-2.0 vs. 2.5), and user safety (2.5 vs. 3.4). Analysis of card self-explanation revealed no remarkable differences. CONCLUSION: Despite good performance of all card systems tested, the best results when including all criteria evaluated were obtained with card no. 4 (particularly concerning clear agglutination), followed by cards no. 2, no. 1, and no. 3.

  7. Handling device for nuclear fuel assemblies and assembly appropriate for such a device

    International Nuclear Information System (INIS)

    Cransac, J.P.; Jaquelin, R.; Renaux, C.

    1985-01-01

    The handling device comprises a guide tube of which axis is vertical, in which a grab moves, hanging from a chain, under the action of a back-geared motor. The grab being stopped in its rotation in the guide tube, an assembly can be gripped with a bayonet system while controlling the rotation of the grab - guide tube system a back-geared motor. The device can be hanged from the small or large rotating plug of a fast neutron reactor. It can be used in a handling flask [fr

  8. Survey of technology for decommissioning of nuclear fuel cycle facilities. 8. Remote handling and cutting techniques

    Energy Technology Data Exchange (ETDEWEB)

    Ogawa, Ryuichiro; Ishijima, Noboru [Japan Nuclear Cycle Development Inst., Oarai, Ibaraki (Japan). Oarai Engineering Center

    1999-03-01

    In nuclear fuel cycle facility decommissioning and refurbishment, the remote handling techniques such as dismantling, waste handling and decontamination are needed to reduce personnel radiation exposure. The survey research for the status of R and D activities on remote handling tools suitable for nuclear facilities in the world and domestic existing commercial cutting tools applicable to decommissioning of the facilities was conducted. In addition, the drive mechanism, sensing element and control system applicable to the remote handling devices were also surveyed. This report presents brief surveyed summaries. (H. Itami)

  9. Maintenance of the JET active gas handling system

    International Nuclear Information System (INIS)

    Brennan, P.D.; Bell, A.C.; Brown, K.; Cole, C.; Cooper, B.; Gibbons, C.; Harris, M.; Jones, G.; Knipe, S.; Lewis, J.; Manning, C.; Miller, A.; Perevezentsev, A.; Skinner, N.; Stagg, R.; Stead, M.; Thomas, R.; Yorkshades, J.

    2003-01-01

    The JET active gas handling system (AGHS) has been in operation in conjunction with the JET machine since Spring 1997. The tritium levels within the vessel have remained sufficiently high, 6.2 g at the end of the DTE1 experiment and currently 1.5 g, such that the AGHS has been required to operate continuously to detritiate gases liberated during D-D operations and to maintain discharges to the environment to ALARP. Maintaining the system to ensure continued operation has been a key factor in guaranteeing the continued availability of the essential sub-systems. The operational history of the JET AGHS has been previously documented in a number of papers [R. Laesser, et al. Proc. of the 19th SOFT Conf. 1 (1996) 227; R. Laesser, et al., Fusion Eng. Des. 46 (1999) 307; P.D. Brennan, et al., 18th Symp. on Fusion Eng., 1999]. Operational downtime is minimised through well-engineered sub-systems that use high integrity components. Outage, contamination and operator dosage are minimised through pre-planned and prepared maintenance operations. The reliability of sub-system critical condition fault detection is demonstrated through routine testing of hard-wired alarms and interlocks

  10. The ATLAS/TILECAL Detector Control System

    CERN Document Server

    Santos, H; The ATLAS collaboration

    2010-01-01

    Tilecal, the barrel hadronic calorimeter of ATLAS, is a sampling calorimeter where scintillating tiles are embedded in an iron matrix. The tiles are optically coupled to wavelength shifting fibers that carry the optical signal to photo-multipliers. It has a cylindrical shape and is made out of 3 cylinders, the Long Barrel with the LBA and LBC partitions, and the two Extended Barrel with the EBA and EBC partitions. The main task of the Tile calorimeter Detector Control System (DCS) is to enable the coherent and safe operation of the calorimeter. All actions initiated by the operator, as well as all errors, warnings and alarms concerning the hardware of the detector are handled by DCS. The Tile calorimeter DCS controls and monitors mainly the low voltage and high voltage power supply systems, but it is also interfaced with the infrastructure (cooling system and racks), the laser and cesium calibration systems, the data acquisition system, configuration and conditions databases and the detector safety system. In...

  11. Automation of Aditya vacuum control system based on CODAC Core System

    Energy Technology Data Exchange (ETDEWEB)

    Raulji, Vismaysinh D., E-mail: vismay@ipr.res.in; Pujara, Harshad; Arambhadiya, Bharat; Jadeja, Kumarpalsinh; Bhatt, Shailesh; Rajpal, Rachana

    2016-11-15

    Highlights: • Monitor and control of vacuum control system based on CODAC Core System. • Communication between SIEMENS PLC and open source software EPICS. • With CODAC Core easy to configure and programming of slow controller. - Abstract: The main objective of vacuum control system is to provide ultrahigh vacuum for Aditya Tokamak operations. Aditya Vacuum vessel is having four vacuum pumping lines. To demonstrate implementation of automation; a study case is under taken by automating single Pumping Line of the Aditya vacuum system using CODAC Core System (CCS). Currently, vacuum system is operated manually. The CCS based control system allows remote control, monitoring, alarm handling of vacuum parameters. The CODAC Core System is the Linux based software package that is distributed by ITER Organization for the development of Plant System I&C software. CODAC Core System includes EPICS, CSS (Control System Studio) etc. CSS is used for HMI (Human Machine Interface), alarms and archives. SDD (Self Description Data) tool is used to configure plant system I&C. SDD Editor is an Eclipse based application to define the plant system, interface, I&C component, interfaced signals, configure variable. SCADA (Supervisory Control and Data Acquisition) system is developed in CSS. Data is transferred between PLC and CSS through EPICS. The complete system is tested with Aditya Vacuum Control System with process interlocks. Operator interface is also developed using Lab VIEW as a choice of the user. This paper will describe the salient features of the developed control system in detail.

  12. The use of virtual reality for preparation and implementation of JET remote handling operations

    International Nuclear Information System (INIS)

    Sanders, S.; Rolfe, A.C.

    2003-01-01

    The use of real time 3-D computer graphic models for preparation and support of remote handling operations on JET has been in use since the mid 1980s. A complete review has been undertaken of the functional requirements and benefits of VR for remote handling and a subsequent market survey of the present state-of-the-art of VR systems has resulted in the implementation of a new system for JET. The VR system is used in two discrete modes: in on-line mode the remote handling equipment Electro-mechanical hardware is connected to the VR system and provides input for the VR system to update a real time 3-D display of the equipment inside the torus. This mode supplements the video camera system and assists with camera control and warnings of impending or potential collisions. In Off-line mode the operator manipulates the VR system model with no connections to the remote handling equipment. This mode is used during preparation of RH operational strategies, checking of operational feasibility and operations procedures. Various VR systems were evaluated against a detailed technical specification that covered visualisation function and performance, user interface design and base model input/creation capabilities. The cheapest of those systems that satisfied the technical requirements was selected

  13. Notification: Audit of Security Categorization for EPA Systems That Handle Hazardous Material Information

    Science.gov (United States)

    Project #OA-FY18-0089, January 8, 2018. The OIG plans to begin preliminary research to determine whether the EPA classified the sensitivity of data for systems that handle hazardous waste material information as prescribed by NIST.

  14. Model predictive control technologies for efficient and flexible power consumption in refrigeration systems

    DEFF Research Database (Denmark)

    Hovgaard, Tobias Gybel; Larsen, Lars F. S.; Edlund, Kristian

    2012-01-01

    . In this paper we describe a novel economic-optimizing Model Predictive Control (MPC) scheme that reduces operating costs by utilizing the thermal storage capabilities. A nonlinear optimization tool to handle a non-convex cost function is utilized for simulations with validated scenarios. In this way we...... explicitly address advantages from daily variations in outdoor temperature and electricity prices. Secondly, we formulate a new cost function that enables the refrigeration system to contribute with ancillary services to the balancing power market. This involvement can be economically beneficial...... of the system models allows us to describe and handle model as well as prediction uncertainties in this framework. This means we can demonstrate means for robustifying the performance of the controller....

  15. Monitored Retrievable Storage conceptual system study: dry receiving and handling facility

    International Nuclear Information System (INIS)

    1984-01-01

    A preconceptual design and estimate for a MRS receiving and handling (R and H) facility at a hypothetical site in the United States are presented. The facility consists of a receiving and handling building plus associated operating buildings, system, and site development features. The R and H building and the supporting buildings and site development features are referred to as the R and H area. Adjoining the R and H area will be an interim waste storage area currently being considered by others. The desirability of building a full capacity (3000-MTU) MRS facility initially versus adding additional capacity at a later date in a phased construction program was investigated. Several advantages of phased construction include incorporation of new designs, modification of receiving-handling-packaging, and changes in regulatory requirements or the waste management program which may develop following startup and operation of an 1800-MTU MRS facility. The cost of a 3000-MTU MRS facility constructed initially was estimated at $193,200,000. If a phased construction program was implemented, including escalation to the mid-point of Phase 2 construction, a capital expenditure of $215,300,000 is estimated - a cost penalty of $22,100,000 or about 11% for phased construction

  16. Handling Large and Complex Data in a Photovoltaic Research Institution Using a Custom Laboratory Information Management System

    Energy Technology Data Exchange (ETDEWEB)

    White, Robert R.; Munch, Kristin

    2014-01-01

    Twenty-five years ago the desktop computer started becoming ubiquitous in the scientific lab. Researchers were delighted with its ability to both control instrumentation and acquire data on a single system, but they were not completely satisfied. There were often gaps in knowledge that they thought might be gained if they just had more data and they could get the data faster. Computer technology has evolved in keeping with Moore’s Law meeting those desires; however those improvements have of late become both a boon and bane for researchers. Computers are now capable of producing high speed data streams containing terabytes of information; capabilities that evolved faster than envisioned last century. Software to handle large scientific data sets has not kept up. How much information might be lost through accidental mismanagement or how many discoveries are missed through data overload are now vital questions. An important new task in most scientific disciplines involves developing methods to address those issues and to create the software that can handle large data sets with an eye towards scalability. This software must create archived, indexed, and searchable data from heterogeneous instrumentation for the implementation of a strong data-driven materials development strategy. At the National Center for Photovoltaics in the National Renewable Energy Laboratory, we began development a few years ago on a Laboratory Information Management System (LIMS) designed to handle lab-wide scientific data acquisition, management, processing and mining needs for physics and materials science data, and with a specific focus towards future scalability for new equipment or research focuses. We will present the decisions, processes, and problems we went through while building our LIMS system for materials research, its current operational state and our steps for future development.

  17. SUMAC: A monitor and control tree for multi-FPGA systems

    International Nuclear Information System (INIS)

    Gao, Mingshen

    1999-01-01

    The BTeV pixel trigger is a data acquisition system capable of finding tracks and vertices in real time in the BTeV pixel detector array. The trigger uses some 3000 processing elements (DSPs) arranged in three processing levels to handle a raw data rate of nearly 100 Gigabytes per second and bring the trigger rate down to 10 KHz. The trigger system has more than 6000 programmable elements, including Field Programmable Logic Arrays (FPGAs), microprocessors (DSPs, interface to the monitor and control tree through FPGAs), and others. Sumac (Serial Utility Monitor and Control tree) is used for configuring and monitoring of these devices. Its primary function is the downloading of FPGA bit streams, microprocessor programs, chip configurations, and test data. In addition, remote cpus and other devices can send messages and status back to the host. The Sumac system is capable of handling several thousand remote devices from a single host PC. Because it stores configuration data in local flash eeproms, it will be capable of achieving a complete system reboot in less than 1 second. The Sumac system is a tree hierarchy connected via high-speed serial links. Typically each board in the system will have a control node which accepts a single upstream serial link and fans out to as many as 32 downstream links. The downstream links can connect to FPGAs or to other control nodes for further fanout

  18. A critical analysis of the X.400 model of message handling systems

    NARCIS (Netherlands)

    van Sinderen, Marten J.; Dorregeest, Evert

    1988-01-01

    The CCITT X.400 model of store and forward Message Handling Systems (MHS) serves as a common basis for the definition of electronic mail services and protocols both within CCITT and ISO. This paper presents an analysis of this model and its related recommendations from two perspectives. First the

  19. Oxygen Handling and Cooling Options in High Temperature Electrolysis Plants

    Energy Technology Data Exchange (ETDEWEB)

    Manohar S. Sohal; J. Stephen Herring

    2008-07-01

    Idaho National Laboratory is working on a project to generate hydrogen by high temperature electrolysis (HTE). In such an HTE system, safety precautions need to be taken to handle high temperature oxygen at ~830°C. This report is aimed at addressing oxygen handling in a HTE plant.. Though oxygen itself is not flammable, most engineering material, including many gases and liquids, will burn in the presence of oxygen under some favorable physicochemical conditions. At present, an absolute set of rules does not exist that can cover all aspects of oxygen system design, material selection, and operating practices to avoid subtle hazards related to oxygen. Because most materials, including metals, will burn in an oxygen-enriched environment, hazards are always present when using oxygen. Most materials will ignite in an oxygen-enriched environment at a temperature lower than that in air, and once ignited, combustion rates are greater in the oxygen-enriched environment. Even many metals, if ignited, burn violently in an oxygen-enriched environment. However, these hazards do not preclude the operations and systems involving oxygen. Oxygen can be safely handled and used if all the materials in a system are not flammable in the end-use environment or if ignition sources are identified and controlled. In fact, the incidence of oxygen system fires is reported to be low with a probability of about one in a million. This report is a practical guideline and tutorial for the safe operation and handling of gaseous oxygen in high temperature electrolysis system. The intent is to provide safe, practical guidance that permits the accomplishment of experimental operations at INL, while being restrictive enough to prevent personnel endangerment and to provide reasonable facility protection. Adequate guidelines are provided to govern various aspects of oxygen handling associated with high temperature electrolysis system to generate hydrogen. The intent here is to present acceptable

  20. The Tilecal/ATLAS detector control system

    CERN Document Server

    Tomasio Pina, João Antonio

    2004-01-01

    Tilecal is the barrel hadronic calorimeter of the ATLAS detector that is presently being built at CERN to operate at the LHC accelerator. The main task of the Tilecal detector control system (DCS) is to enable the coherent and safe operation of the detector. All actions initiated by the operator and all errors, warnings, and alarms concerning the hardware of the detector are handled by DCS. The DCS has to continuously monitor all operational parameters, give warnings and alarms concerning the hardware of the detector. The DCS architecture consists of a distributed back-end (BE) system running on PC's and different front-end (FE) systems. The implementation of the BE will he achieved with a commercial supervisory control and data acquisition system (SCADA) and the FE instrumentation will consist on a wide variety of equipment. The connection between the FE and BE is provided by fieldbus or L

  1. Monitor: a short-cut approach to remote-handling at LAMPF

    International Nuclear Information System (INIS)

    Horne, R.A.; Ekberg, E.L.

    1975-01-01

    The monitor, constructed from relatively cheap commercial components, is a straightforward, totally remotely operated handling system intended to work on components in the LAMPF external beam line or elsewhere. It can be towed or lifted into position, then hard-wire controlled from a distance by using television. (auth)

  2. Cooperative control system of the floating cranes for the dual lifting

    OpenAIRE

    Mihee Nam; Jinbeom Kim; Jaechang Lee; Daekyung Kim; Donghyuk Lee; Jangmyung Lee

    2018-01-01

    This paper proposes a dual lifting and its cooperative control system with two different kinds of floating cranes. The Mega-erection and Giga-erection in the ship building are used to handle heavier and wider blocks and modules as ships and off-shore platforms are enlarged. However, there is no equipment to handle such Tera-blocks. In order to overcome the limit on performance of existing floating cranes, the dual lifting is proposed in this research. In the dual lifting, two floating cranes ...

  3. Analysis of ITER upper port plug remote handling maintenance scenarios

    International Nuclear Information System (INIS)

    Koning, J.F.; Baar, M.R. de; Elzendoorn, B.S.Q.; Heemskerk, C.J.M.; Ronden, D.M.S.; Schuth, W.J.

    2012-01-01

    Highlights: ► Remote Handling Study Centre: providing RH compatibility analysis. ► Simulation: virtual reality including kinematics and realtime physics simulator. ► Applied on analysis of RH compatibility of Upper Launcher component replacement. ► Resulting in lowered maintenance procedure time and lessons learned. - Abstract: The ITER tokamak has a modular design, with port plugs, blanket modules and divertor cassettes. This set-up allows for maintenance of diagnostics, heating systems and first wall elements. The maintenance can be done in situ, or in the Hot Cell. Safe and effective remote handling (RH) will be ensured by the RH requirements and standards. Compliance is verified through remote handling compatibility assessments at the ITER Design Review milestones. The Remote Handling Study Centre at FOM Institute DIFFER is created to study ITER RH maintenance processes at different levels of complexity, from relatively simple situational awareness checks using snap-shots in the CAD system, time studies using virtual reality (VR) animations, to extensive operational sequence validation with multiple operators in real-time. The multi-operator facility mimics an RH work-cell as presently foreseen in the ITER RH control room. Novel VR technology is used to create a realistic setting in which a team of RH operators can interact with virtual ITER environments. A physics engine is used to emulate real-time contact interaction as to provide realistic haptic feed-back. Complex interactions between the RH operators and the control room system software are tested. RH task performance is quantified and operational resource usage estimated. The article provides a description and lessons learned from a recent study on replacement of the Steering Mirror Assembly on the ECRH (Electron Cyclotron Resonance Heating) Upper Launcher port plug.

  4. Analysis of ITER upper port plug remote handling maintenance scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Koning, J.F., E-mail: j.f.koning@heemskerk-innovative.nl [FOM Institute DIFFER - Dutch Institute for Fundamental Energy Research, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Baar, M.R. de; Elzendoorn, B.S.Q. [FOM Institute DIFFER - Dutch Institute for Fundamental Energy Research, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Heemskerk, C.J.M. [Heemskerk Innovative Technology, Noordwijk (Netherlands); Ronden, D.M.S.; Schuth, W.J. [FOM Institute DIFFER - Dutch Institute for Fundamental Energy Research, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE Nieuwegein (Netherlands)

    2012-08-15

    Highlights: Black-Right-Pointing-Pointer Remote Handling Study Centre: providing RH compatibility analysis. Black-Right-Pointing-Pointer Simulation: virtual reality including kinematics and realtime physics simulator. Black-Right-Pointing-Pointer Applied on analysis of RH compatibility of Upper Launcher component replacement. Black-Right-Pointing-Pointer Resulting in lowered maintenance procedure time and lessons learned. - Abstract: The ITER tokamak has a modular design, with port plugs, blanket modules and divertor cassettes. This set-up allows for maintenance of diagnostics, heating systems and first wall elements. The maintenance can be done in situ, or in the Hot Cell. Safe and effective remote handling (RH) will be ensured by the RH requirements and standards. Compliance is verified through remote handling compatibility assessments at the ITER Design Review milestones. The Remote Handling Study Centre at FOM Institute DIFFER is created to study ITER RH maintenance processes at different levels of complexity, from relatively simple situational awareness checks using snap-shots in the CAD system, time studies using virtual reality (VR) animations, to extensive operational sequence validation with multiple operators in real-time. The multi-operator facility mimics an RH work-cell as presently foreseen in the ITER RH control room. Novel VR technology is used to create a realistic setting in which a team of RH operators can interact with virtual ITER environments. A physics engine is used to emulate real-time contact interaction as to provide realistic haptic feed-back. Complex interactions between the RH operators and the control room system software are tested. RH task performance is quantified and operational resource usage estimated. The article provides a description and lessons learned from a recent study on replacement of the Steering Mirror Assembly on the ECRH (Electron Cyclotron Resonance Heating) Upper Launcher port plug.

  5. Improved control rod drive handling equipment for BWRs [boiling-water reactors]: Final report

    International Nuclear Information System (INIS)

    Turner, A.P.L.; Gorman, J.A.

    1987-08-01

    Improved equipment for removing and replacing control rod drives (CRDs) in BWR plants has been designed, built and tested. Control rod drives must be removed from the reactor periodically for servicing. Removal and replacement of CRDs using equipment originally supplied with the plant has long been recognized as one of the more difficult and highest radiation exposure maintenance operations that must be performed at BWR plants. The improved equipment was used for the first time at Quad Cities, Unit 2, during a Fall 1986 outage. The trial of the equipment was highly successful, and it was shown that the new equipment significantly improves CRD handling operations. The new equipment significantly simplifies the sequence of operations required to lower a CRD from its housing, upend it to a horizontal orientation, and transport it out of the reactor containment. All operations of the new equipment are performed from the undervessel equipment handling platform, thus, eliminating the requirement for a person to work on the lower level of the undervessel gallery which is often highly contaminated. Typically, one less person is required to operate the equipment than were used with the older equipment. The new equipment incorporates a number of redundant and fail safe features that improve operations and reduce the chances for accidents

  6. Operating System For Numerically Controlled Milling Machine

    Science.gov (United States)

    Ray, R. B.

    1992-01-01

    OPMILL program is operating system for Kearney and Trecker milling machine providing fast easy way to program manufacture of machine parts with IBM-compatible personal computer. Gives machinist "equation plotter" feature, which plots equations that define movements and converts equations to milling-machine-controlling program moving cutter along defined path. System includes tool-manager software handling up to 25 tools and automatically adjusts to account for each tool. Developed on IBM PS/2 computer running DOS 3.3 with 1 MB of random-access memory.

  7. Aerobot Sampling and Handling System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Honeybee Robotics proposes to: ?Derive and document the functional and technical requirements for Aerobot surface sampling and sample handling across a range of...

  8. Mechatronics of fuel handling mechanism for fast experimental reactor 'Joyo'

    Energy Technology Data Exchange (ETDEWEB)

    Fujiwara, Akikazu (Power Reactor and Nuclear Fuel Development Corp., Oarai, Ibaraki (Japan). Oarai Engineering Center)

    1984-01-01

    The outline of the fast experimental reactor ''Joyo'' is introduced, and the fuel handling mechanism peculiar to fast reactors is described. The objectives of the construction of Joyo are to obtain the techniques for the design, construction, manufacture, installation, operation and maintenance of sodium-cooled fast reactors independently, and to use it as an irradiation facility for the development of fuel and materials for fast breeder reactors. At present, the reactor is operated at 100 MW maximum thermal output for the second objective. Since liquid sodium is used as the coolant, the atmosphere of the fuel handling course changes such as liquid sodium at 250 deg C, argon gas at 200 deg C and water, in addition, the spent fuel taken out has the decay heat of 2.1 kW at maximum. The fuel handling works in the reactor and fuel transfer works, and the fuel handling mechanism of a fuel exchanger and that of a cask car for fuel handling are described. Relay sequence control system is used for the fuel handling mechanism of Joyo.

  9. Development of Pneumatic Transport System (PTS) for safe handling of uranium oxide powder in UMP/UED

    International Nuclear Information System (INIS)

    Manna, S.; Satpati, S.K.; Roy, S.B.

    2009-01-01

    Tonnage quantity radioactive uranium oxide powder of particle size sub micron to 100 micron is handled in Uranium Metal Plant (UMP), UED/BARC for production of nuclear grade uranium metal, required for fuelling research reactors - Dhruva and Cirus. A Pneumatic Transfer System (PTS) using vacuum has been introduced and is being used for handling radioactive powder to improve radiation protection

  10. Computerised programming of the Dragon reactor fuel handling operations

    International Nuclear Information System (INIS)

    Butcher, P.

    1976-11-01

    Two suites of FORTRAN IV computer programs have been written to produce check lists for the operation of the two remote control fuel handling machines of the Dragon Reactor. This document describes the advantages of these programs over the previous manual system of writing check lists, and provides a detailed guide to the programs themselves. (author)

  11. Report on achievements of research and development of an automatic sewing system in fiscal 1986. System management and control technology; 1986 nendo jido hosei system no kenkyu kaihatsu seika hokokusho. System kanri seigyo gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    The Automatic Sewing System Technology Research Association was commissioned from the Agency of Industrial Science and Technology on the 'development of an automatic sewing system'. The association is performing the research and development by dividing the subject into such component technologies as a total system and sewing preparation and processing technology, a sewing and assembling technology, a cloth handling technology, and a system management and control technology. This paper reports the achievement of the research and development on the system management and control technology. Plans have been established on the following items: dimensional inspection of sewn parts by using an image processing technology, real-time processing of the matching work interlocked with a striped pattern cloth handling device, and a processing positioning algorithm to instruct sewing lines and needle dropping points based on contour lines of pockets and collars. The effects thereof were verified. Printing seven-segmented numerals on cloth by using fluorescent whitener and an automatic reading test of the printed information verified that the technology can be applied to tracking the parts in a processing line as an ID information. Researches were also made on unification of micro-computers for controlling such automatic machines as a multi-functional sewing machine, a three-dimensional sewing machine, and a cloth handling and positioning device, as well as on interface with the computer for function sharing management and control. (NEDO)

  12. Report on achievements of research and development of an automatic sewing system in fiscal 1986. System management and control technology; 1986 nendo jido hosei system no kenkyu kaihatsu seika hokokusho. System kanri seigyo gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    The Automatic Sewing System Technology Research Association was commissioned from the Agency of Industrial Science and Technology on the 'development of an automatic sewing system'. The association is performing the research and development by dividing the subject into such component technologies as a total system and sewing preparation and processing technology, a sewing and assembling technology, a cloth handling technology, and a system management and control technology. This paper reports the achievement of the research and development on the system management and control technology. Plans have been established on the following items: dimensional inspection of sewn parts by using an image processing technology, real-time processing of the matching work interlocked with a striped pattern cloth handling device, and a processing positioning algorithm to instruct sewing lines and needle dropping points based on contour lines of pockets and collars. The effects thereof were verified. Printing seven-segmented numerals on cloth by using fluorescent whitener and an automatic reading test of the printed information verified that the technology can be applied to tracking the parts in a processing line as an ID information. Researches were also made on unification of micro-computers for controlling such automatic machines as a multi-functional sewing machine, a three-dimensional sewing machine, and a cloth handling and positioning device, as well as on interface with the computer for function sharing management and control. (NEDO)

  13. Development of a handling technology for underwater inspection and dismantling

    International Nuclear Information System (INIS)

    Rose, N.

    1994-01-01

    For the purpose of underwater inspection and dismantling of nuclear facilities, a prototype of a freely submersible, remote-controlled handling system was developed and tested under laboratory conditions. Particular interest was taken in the specific boundary conditions of the area of application and the methodological concept. The system was developed in three phases; in each phase, a prototype was constructed and tested. (orig.) [de

  14. Safety of Cargo Aircraft Handling Procedure

    Directory of Open Access Journals (Sweden)

    Daniel Hlavatý

    2017-07-01

    Full Text Available The aim of this paper is to get acquainted with the ways how to improve the safety management system during cargo aircraft handling. The first chapter is dedicated to general information about air cargo transportation. This includes the history or types of cargo aircraft handling, but also the means of handling. The second part is focused on detailed description of cargo aircraft handling, including a description of activities that are performed before and after handling. The following part of this paper covers a theoretical interpretation of safety, safety indicators and legislative provisions related to the safety of cargo aircraft handling. The fourth part of this paper analyzes the fault trees of events which might occur during handling. The factors found by this analysis are compared with safety reports of FedEx. Based on the comparison, there is a proposal on how to improve the safety management in this transportation company.

  15. Control by damping Injection of Electrodynamic Tether System in an Inclined Orbit

    DEFF Research Database (Denmark)

    Larsen, Martin Birkelund; Blanke, Mogens

    2009-01-01

    dynamical system. Based on this model, a nonlinear controller is designed that will make the system asymptotically stable around its open-loop equilibrium. The control scheme handles the time-varying nature of the system in a suitable manner resulting in a large operational region. The performance...... of the closed loop system is treated using Floquet theory, investigating the closed loop properties for their dependency of the controller gain and orbit inclination.......Control of a satellite system with an electrodynamic tether as actuator is a time-periodic and underactuated control problem. This paper considers the tethered satellite in a Hamiltonian framework and determines a port-controlled Hamiltonian formulation that adequately describes the nonlinear...

  16. RAMAS: The RITL Automated Management System. Master Control and Periodicals Control Subsystems. Stockholm Papers in Library and Information Science.

    Science.gov (United States)

    Ya-chun, Lian

    An automated minicomputer-based library management system is being developed at the Swedish Royal Institute of Technology Library (RITL). RAMAS (the RITL Automated Management System) currently deals with periodical check-in, claiming, index-handling, and binding control. A RAMAS bibliographic record can be accessed from eight different points…

  17. An Evaluation of Automatic Control System Concepts for General Aviation Airplanes

    Science.gov (United States)

    Stewart, E. C.

    1990-01-01

    A piloted simulation study of automatic longitudinal control systems for general aviation airplanes has been conducted. These automatic control systems were designed to make the simulated airplane easy to fly for a beginning or infrequent pilot. Different control systems are presented and their characteristics are documented. In a conventional airplane control system each cockpit controller commands combinations of both the airspeed and the vertical speed. The best system in the present study decoupled the airspeed and vertical speed responses to cockpit controller inputs. An important feature of the automatic system was that neither changing flap position nor maneuvering in steeply banked turns affected either the airspeed or the vertical speed. All the pilots who flew the control system simulation were favorably impressed with the very low workload and the excellent handling qualities of the simulated airplane.

  18. Structure of the main control system for the FTU device

    International Nuclear Information System (INIS)

    Panaccione, L.

    1983-01-01

    The computer based control system for FTU (Frascati Tokamak Upgrade) machine is a distributed intelligence control system consisting of various subsystems, called ''specific units''. A specific unit can work as a stand-alone small system or as a part of more complex systems, together with other units, in any possible combination. In the case of combined units working mode, a dedicated specific unit performs supervisory functions. Communication between specific units is done on a dedicated bus-like network, in the form of temporary master-slave relationship. There are three groups of specific units: Plant Control Units, Supervisory Control Unit and Synoptic Handling Unit. Performances and structures of these specific units are described. In addition, a very simple hard-wired safety system works in parallel with the computer based control system, in order to save personnel and apparatus. (author)

  19. Lessons learned on the Ground Test Accelerator control system

    International Nuclear Information System (INIS)

    Kozubal, A.J.; Weiss, R.E.

    1994-01-01

    When we initiated the control system design for the Ground Test Accelerator (GTA), we envisioned a system that would be flexible enough to handle the changing requirements of an experimental project. This control system would use a developers' toolkit to reduce the cost and time to develop applications for GTA, and through the use of open standards, the system would accommodate unforeseen requirements as they arose. Furthermore, we would attempt to demonstrate on GTA a level of automation far beyond that achieved by existing accelerator control systems. How well did we achieve these goals? What were the stumbling blocks to deploying the control system, and what assumptions did we make about requirements that turned out to be incorrect? In this paper we look at the process of developing a control system that evolved into what is now the ''Experimental Physics and Industrial Control System'' (EPICS). Also, we assess the impact of this system on the GTA project, as well as the impact of GTA on EPICS. The lessons learned on GTA will be valuable for future projects

  20. Design of integrated systems for control and detection of actuator/sensor faults

    DEFF Research Database (Denmark)

    Stoustrup, J.; Grimble, M.J.; Niemann, Hans Henrik

    1997-01-01

    Consider control systems operating under potentially faulty conditions. Discusses the problems of designing a single unit which not only handle the required control but also identified faults occuring in actuators and sensors. In common practice, unites for control and for diagnosis are designed......-integrated design of control and diagnosis unit. Shows how a combined module for control and diagnosis can be designed which is able to follow references and reject disturbances robustly, control the system so that the undertected faults do not have disastrous effect, reduce the number of false alarams and indetify...

  1. Online Decision Support System (IRODOS) - an emergency preparedness tool for handling offsite nuclear emergency

    International Nuclear Information System (INIS)

    Vinod Kumar, A.; Oza, R.B.; Chaudhury, P.; Suri, M.; Saindane, S.; Singh, K.D.; Bhargava, P.; Sharma, V.K.

    2009-01-01

    A real time online decision support system as a nuclear emergency response system for handling offsite nuclear emergency at the Nuclear Power Plants (NPPs) has been developed by Health, Safety and Environment Group, Bhabha Atomic Research Centre (BARC), Department of Atomic Energy (DAE) under the frame work of 'Indian Real time Online Decision Support System 'IRODOS'. (author)

  2. Evaluation of design and operation of fuel handling systems for 25 MW biomass fueled CFB power plants

    International Nuclear Information System (INIS)

    Precht, D.

    1991-01-01

    Two circulating fluidized bed, biomass fueled, 25MW power plants were placed into operation by Thermo Electron Energy Systems in California during late 1989. This paper discusses the initial fuel and system considerations, system design, actual operating fuel characterisitics, system operation during the first year and modifications. Biomass fuels handled by the system include urban/manufacturing wood wastes and agricultural wastes in the form of orchard prunings, vineyard prunings, pits, shells, rice hulls and straws. Equipment utilized in the fuel handling system are described and costs are evaluated. Lessons learned from the design and operational experience are offered for consideration on future biomass fueled installations where definition of fuel quality and type is subject to change

  3. Palantiri: a distributed real-time database system for process control

    International Nuclear Information System (INIS)

    Tummers, B.J.; Heubers, W.P.J.

    1992-01-01

    The medium-energy accelerator MEA, located in Amsterdam, is controlled by a heterogeneous computer network. A large real-time database contains the parameters involved in the control of the accelerator and the experiments. This database system was implemented about ten years ago and has since been extended several times. In response to increased needs the database system has been redesigned. The new database environment, as described in this paper, consists out of two new concepts: (1) A Palantir which is a per machine process that stores the locally declared data and forwards all non local requests for data access to the appropriate machine. It acts as a storage device for data and a looking glass upon the world. (2) Golems: working units that define the data within the Palantir, and that have knowledge of the hardware they control. Applications access the data of a Golem by name (which do resemble Unix path names). The palantir that runs on the same machine as the application handles the distribution of access requests. This paper focuses on the Palantir concept as a distributed data storage and event handling device for process control. (author)

  4. Evolving the JET virtual reality system for delivering the JET EP2 shutdown remote handling tasks

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Adrian, E-mail: adrian.williams@oxfordtechnologies.co.uk [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon, Oxon, OX14 1RJ (United Kingdom); JET-EFDA, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Sanders, Stephen [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon, Oxon, OX14 1RJ (United Kingdom); JET-EFDA, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Weder, Gerard [Tree-C Technology BV, Buys Ballotstraat 8, 6716 BL Ede (Netherlands); JET-EFDA, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Bastow, Roger; Allan, Peter; Hazel, Stuart [CCFE, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); JET-EFDA, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom)

    2011-10-15

    The quality, functionality and performance of the virtual reality (VR) system used at JET for preparation and implementation of remote handling (RH) operations has been progressively enhanced since its first use in the original JET remote handling shutdown in 1998. As preparation began for the JET EP2 (Enhanced Performance 2) shutdown it was recognised that the VR system being used was unable to cope with the increased functionality and the large number of 3D models needed to fully represent the JET in-vessel components and tooling planned for EP2. A bespoke VR software application was developed in collaboration with the OEM, which allowed enhancements to be made to the VR system to meet the requirements of JET remote handling in preparation for EP2. Performance improvements required to meet the challenges of EP2 could not be obtained from the development of the new VR software alone. New methodologies were also required to prepare source, CATIA models for use in the VR using a collection of 3D software packages. In collaboration with the JET drawing office, techniques were developed within CATIA using polygon reduction tools to reduce model size, while retaining surface detail at required user limits. This paper will discuss how these developments have played an essential part in facilitating EP2 remote handling task development and examine their impact during the EP2 shutdown.

  5. Evolving the JET virtual reality system for delivering the JET EP2 shutdown remote handling tasks

    International Nuclear Information System (INIS)

    Williams, Adrian; Sanders, Stephen; Weder, Gerard; Bastow, Roger; Allan, Peter; Hazel, Stuart

    2011-01-01

    The quality, functionality and performance of the virtual reality (VR) system used at JET for preparation and implementation of remote handling (RH) operations has been progressively enhanced since its first use in the original JET remote handling shutdown in 1998. As preparation began for the JET EP2 (Enhanced Performance 2) shutdown it was recognised that the VR system being used was unable to cope with the increased functionality and the large number of 3D models needed to fully represent the JET in-vessel components and tooling planned for EP2. A bespoke VR software application was developed in collaboration with the OEM, which allowed enhancements to be made to the VR system to meet the requirements of JET remote handling in preparation for EP2. Performance improvements required to meet the challenges of EP2 could not be obtained from the development of the new VR software alone. New methodologies were also required to prepare source, CATIA models for use in the VR using a collection of 3D software packages. In collaboration with the JET drawing office, techniques were developed within CATIA using polygon reduction tools to reduce model size, while retaining surface detail at required user limits. This paper will discuss how these developments have played an essential part in facilitating EP2 remote handling task development and examine their impact during the EP2 shutdown.

  6. A High-Availability, Distributed Hardware Control System Using Java

    Science.gov (United States)

    Niessner, Albert F.

    2011-01-01

    Two independent coronagraph experiments that require 24/7 availability with different optical layouts and different motion control requirements are commanded and controlled with the same Java software system executing on many geographically scattered computer systems interconnected via TCP/IP. High availability of a distributed system requires that the computers have a robust communication messaging system making the mix of TCP/IP (a robust transport), and XML (a robust message) a natural choice. XML also adds the configuration flexibility. Java then adds object-oriented paradigms, exception handling, heavily tested libraries, and many third party tools for implementation robustness. The result is a software system that provides users 24/7 access to two diverse experiments with XML files defining the differences

  7. Procedure of safe handling with cytostatic drugs

    Directory of Open Access Journals (Sweden)

    Kodžo Dragan

    2003-01-01

    Full Text Available Working group for safe handling with cytostatic drugs has been formed by the Ministry of Health, and it consists of professionals from IORS, Federal Bureau of Weights and Measures, Industrial Medicine, Institute of Hematology, Military Medical Academy, and Crown Agents. The aim of this working group is to prepare procedures for safe handling with cytostatic drugs, as well as program for educational seminar for nurses, medical technicians, and pharmaceutical technicians. The procedures will serve as a guide of good practice of oncology health care, and will refer to all actions that health care professionals carry out from the moment of drugs arrival to the pharmacy to the moment of their application. In the first segment of this procedure, general rules are given for working with cytotoxic agents, control for risky exposures, safe system of work, control of working environment, monitoring of the employees' health condition adequate protection in the working environment, protective equipment of the employees (gloves, mask, cap, eyeglasses, shoe covers, coats and chambers for vertical laminary air stream. Storing of cytostatics, procedure in case of accident, and waste handling and removal are also described in this segment. Fifty-three standard operational procedures are described in detail in the second segment. Training scheme for preparation of chemotherapy is given in the third segment - education related to various fields and practical part, which would be carried out through workshops, and at the end of the course participants would pass a test and obtain certificate. After the procedures for safe handling with cytostatics are legally regulated employer will have to provide minimum of protective equipment, special rooms for the drugs dissolving, chambers with laminar airflow, 6 hours working time, rotation of the staff working with drugs dissolving in intervals of every five years, higher efficiency, better health control. In conclusion

  8. Alarm handling systems and techniques developed to match operator tasks

    International Nuclear Information System (INIS)

    Bye, A.; Moum, B.R.

    1997-01-01

    This paper covers alarm handling methods and techniques explored at the Halden Project, and describes current status on the research activities on alarm systems. Alarm systems are often designed by application of a bottom-up strategy, generating alarms at component level. If no structuring of the alarms is applied, this may result in alarm avalanches in major plant disturbances, causing cognitive overload of the operator. An alarm structuring module should be designed using a top-down approach, analysing operator's tasks, plant states, events and disturbances. One of the operator's main tasks during plant disturbances is status identification, including determination of plant status and detection of plant anomalies. The main support of this is provided through the alarm systems, the process formats, the trends and possible diagnosis systems. The alarm system should both physically and conceptually be integrated with all these systems. 9 refs, 5 figs

  9. Alarm handling systems and techniques developed to match operator tasks

    Energy Technology Data Exchange (ETDEWEB)

    Bye, A; Moum, B R [Institutt for Energiteknikk, Halden (Norway). OECD Halden Reaktor Projekt

    1997-09-01

    This paper covers alarm handling methods and techniques explored at the Halden Project, and describes current status on the research activities on alarm systems. Alarm systems are often designed by application of a bottom-up strategy, generating alarms at component level. If no structuring of the alarms is applied, this may result in alarm avalanches in major plant disturbances, causing cognitive overload of the operator. An alarm structuring module should be designed using a top-down approach, analysing operator`s tasks, plant states, events and disturbances. One of the operator`s main tasks during plant disturbances is status identification, including determination of plant status and detection of plant anomalies. The main support of this is provided through the alarm systems, the process formats, the trends and possible diagnosis systems. The alarm system should both physically and conceptually be integrated with all these systems. 9 refs, 5 figs.

  10. An Attribute Based Access Control Framework for Healthcare System

    Science.gov (United States)

    Afshar, Majid; Samet, Saeed; Hu, Ting

    2018-01-01

    Nowadays, access control is an indispensable part of the Personal Health Record and supplies for its confidentiality by enforcing policies and rules to ensure that only authorized users gain access to requested resources in the system. In other words, the access control means protecting patient privacy in healthcare systems. Attribute-Based Access Control (ABAC) is a new access control model that can be used instead of other traditional types of access control such as Discretionary Access Control, Mandatory Access Control, and Role-Based Access Control. During last five years ABAC has shown some applications in both recent academic fields and industry purposes. ABAC by using user’s attributes and resources, makes a decision according to an access request. In this paper, we propose an ABAC framework for healthcare system. We use the engine of ABAC for rendering and enforcing healthcare policies. Moreover, we handle emergency situations in this framework.

  11. Structural analysis of fuel handling systems

    Energy Technology Data Exchange (ETDEWEB)

    Lee, L S.S. [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1997-12-31

    The purpose of this paper has three aspects: (i) to review `why` and `what` types of structural analysis, testing and report are required for the fuel handling systems according to the codes, or needed for design of a product, (ii) to review the input requirements for analysis and the analysis procedures, and (iii) to improve the communication between the analysis and other elements of the product cycle. The required or needed types of analysis and report may be categorized into three major groups: (i) Certified Stress Reports for design by analysis, (ii) Design Reports not required for certification and registration, but are still required by codes, and (iii) Design Calculations required by codes or needed for design. Input requirements for structural analysis include: design, code classification, loadings, and jurisdictionary boundary. Examples of structural analysis for the fueling machine head and support structure are given. For improving communication between the structural analysis and the other elements of the product cycle, some areas in the specification of design requirements and load rating are discussed. (author). 6 refs., 1 tab., 4 figs.

  12. Structural analysis of fuel handling systems

    International Nuclear Information System (INIS)

    Lee, L.S.S.

    1996-01-01

    The purpose of this paper has three aspects: (i) to review 'why' and 'what' types of structural analysis, testing and report are required for the fuel handling systems according to the codes, or needed for design of a product, (ii) to review the input requirements for analysis and the analysis procedures, and (iii) to improve the communication between the analysis and other elements of the product cycle. The required or needed types of analysis and report may be categorized into three major groups: (i) Certified Stress Reports for design by analysis, (ii) Design Reports not required for certification and registration, but are still required by codes, and (iii) Design Calculations required by codes or needed for design. Input requirements for structural analysis include: design, code classification, loadings, and jurisdictionary boundary. Examples of structural analysis for the fueling machine head and support structure are given. For improving communication between the structural analysis and the other elements of the product cycle, some areas in the specification of design requirements and load rating are discussed. (author). 6 refs., 1 tab., 4 figs

  13. A simple optical fibre-linked remote control system for multiple devices

    Indian Academy of Sciences (India)

    We report on the development of a simple control system which can handle multiple devices through an optical fibre data link. The devices are controlled using a set of DACs through serial data communication via a serial port of a PC. Serial data from the PC get converted to parallel mode using a homemade “serial in ...

  14. Cask and plug handling system design in port cell

    International Nuclear Information System (INIS)

    Martins, Jean-Pierre; Friconneau, Jean-Pierre; Gabellini, Eros; Keller, Delphine; Levesy, Bruno; Selvi, Anna; Tesini, Alessandro; Utin, Yuri; Wagrez, Julien

    2011-01-01

    The ITER maintenance strategy relies partly on the remote transfer of components from vacuum vessel to hot cells. This function will be fulfilled by transfer cask systems. This paper describes the recent design progresses on interfaces in order to increase components handling feasibility by implementing continuous guiding features that avoid cantilevered loads on the in-cask tractor. Also the design has progressed in order to allow generic docking of the casks. When the cask is connected to the port, it becomes part of the machine first confinement boundary, thus it must provide tightness continuity. This high level safety function was one of the main concerns of a finite element analysis study that has been performed to assess the behavior of the whole system. Numerical analysis methodology and results are explained and shown in order to highlight how it has reinforced the knowledge of the system.

  15. Model Predictive Control for Smart Energy Systems

    DEFF Research Database (Denmark)

    Halvgaard, Rasmus

    pumps, heat tanks, electrical vehicle battery charging/discharging, wind farms, power plants). 2.Embed forecasting methodologies for the weather (e.g. temperature, solar radiation), the electricity consumption, and the electricity price in a predictive control system. 3.Develop optimization algorithms....... Chapter 3 introduces Model Predictive Control (MPC) including state estimation, filtering and prediction for linear models. Chapter 4 simulates the models from Chapter 2 with the certainty equivalent MPC from Chapter 3. An economic MPC minimizes the costs of consumption based on real electricity prices...... that determined the flexibility of the units. A predictive control system easily handles constraints, e.g. limitations in power consumption, and predicts the future behavior of a unit by integrating predictions of electricity prices, consumption, and weather variables. The simulations demonstrate the expected...

  16. Development of radiation hard components for ITER blanket remote handling system

    Energy Technology Data Exchange (ETDEWEB)

    Saito, Makiko, E-mail: saito.makiko@jaea.go.jp; Anzai, Katsunori; Maruyama, Takahito; Noguchi, Yuto; Ueno, Kenichi; Takeda, Nobukazu; Kakudate, Satoshi

    2016-11-01

    Highlights: • Clarify the components that will degrade by gamma ray irradiation. • Perform the irradiation tests to BRHS components. • Optimize the materials to increase the radiation hardness. - Abstract: The ITER blanket remote handling system (BRHS) will be operated in a high radiation environment (250 Gy/h max.) and must stably handle the blanket modules, which weigh 4.5 t and are more than 1.5 m in length, with a high degree of position and posture accuracy. The reliability of the system can be improved by reviewing the failure events of the system caused by high radiation. A failure mode and effects analysis (FMEA) identified failure modes and determined that lubricants, O-rings, and electric insulation cables were the dominant components affecting radiation hardness. Accordingly, we tried to optimize the lubricants and cables of the AC servo motors by using polyphenyl ether (PPE)-based grease and polyether ether ketone (PEEK), respectively. Materials containing radiation protective agents were also selected for the cable sheaths and O-rings to improve radiation hardness. Gamma ray irradiation tests were performed on these components and as a result, a radiation hardness of 8 MGy was achieved for the AC servo motors. On the other hand, to develop the radiation hardness and BRHS compatibility furthermore, the improvement of materials of cable and O ring were performed.

  17. Integrated Payload Data Handling Systems Using Software Partitioning

    Science.gov (United States)

    Taylor, Alun; Hann, Mark; Wishart, Alex

    2015-09-01

    An integrated Payload Data Handling System (I-PDHS) is one in which multiple instruments share a central payload processor for their on-board data processing tasks. This offers a number of advantages over the conventional decentralised architecture. Savings in payload mass and power can be realised because the total processing resource is matched to the requirements, as opposed to the decentralised architecture here the processing resource is in effect the sum of all the applications. Overall development cost can be reduced using a common processor. At individual instrument level the potential benefits include a standardised application development environment, and the opportunity to run the instrument data handling application on a fully redundant and more powerful processing platform [1]. This paper describes a joint program by SCISYS UK Limited, Airbus Defence and Space, Imperial College London and RAL Space to implement a realistic demonstration of an I-PDHS using engineering models of flight instruments (a magnetometer and camera) and a laboratory demonstrator of a central payload processor which is functionally representative of a flight design. The objective is to raise the Technology Readiness Level of the centralised data processing technique by address the key areas of task partitioning to prevent fault propagation and the use of a common development process for the instrument applications. The project is supported by a UK Space Agency grant awarded under the National Space Technology Program SpaceCITI scheme. [1].

  18. Demonstration of a remotely operated TRU waste size-reduction and material handling process

    International Nuclear Information System (INIS)

    Stewart, J.A. III; Schuler, T.F.; Ward, C.R.

    1986-01-01

    Noncombustible Pu-238 and Pu-239 waste is generated as a result of normal operation and decommissioning activity at the Savannah River Plant and is being retrievably stored at the site. As part of the long-term plan to process the stored waste and current waste for permanent disposal, a remote size-reduction and material handling process is being tested at Savannah River Laboratory to provide design support for the plant TRU Waste Facility scheduled to be completed in 1993. The process consists of a large, low-speed shredder and material handling system, a remote worktable, a bagless transfer system, and a robotically controlled manipulator, or Telerobot. Initial testing of the shredder and material handling system and a cycle test of the bagless transfer system were completed. Initial Telerobot run-in and system evaluation was completed. User software was evaluated and modified to support complete menu-driven operation. Telerobot prototype size-reduction tooling was designed and successfully tested. Complete nonradioactive testing of the equipment is scheduled to be completed in 1987

  19. Non-POSIX File System for LHCb Online Event Handling

    CERN Document Server

    Garnier, J C; Cherukuwada, S S

    2011-01-01

    LHCb aims to use its O(20000) CPU cores in the high level trigger (HLT) and its 120 TB Online storage system for data reprocessing during LHC shutdown periods. These periods can last a few days for technical maintenance or only a few hours during beam interfill gaps. These jobs run on files which are staged in from tape storage to the local storage buffer. The result are again one or more files. Efficient file writing and reading is essential for the performance of the system. Rather than using a traditional shared file-system such as NFS or CIFS we have implemented a custom, light-weight, non-Posix network file-system for the handling of these files. Streaming this file-system for the data-access allows to obtain high performance, while at the same time keep the resource consumption low and add nice features not found in NFS such as high-availability, transparent fail-over of the read and write service. The writing part of this streaming service is in successful use for the Online, real-time writing of the d...

  20. Implementation of a new Disruption Mitigation System into the control system of JET

    Energy Technology Data Exchange (ETDEWEB)

    Jachmich, Stefan, E-mail: s.jachmich@fz-juelich.de [Laboratory for Plasma Physics, Ecole Royale Militaire/Koninklijke Militaire School, B-1000 Brussels (Belgium); Kruezi, Uron; Card, Peter; Deakin, Kieron; Kinna, David [Culham Centre for Fusion Energy, Abingdon, Oxon OX14 3DB (United Kingdom); Koslowski, Hans Rudolf; Lambertz, Horst Toni [Forschungszentrum Jülich GmbH, IEK-4, 52425 Jülich (Germany); Lehnen, Michael [ITER Organization, Route de Vinon-sur-Verdon, CS90046, 13067 St Paul Lez Durance Cedex (France)

    2015-10-15

    Highlights: • A new Disruption Mitigation System based on Massive Gas Injection has been installed at JET. • The control of the attached gas handling system had to be integrated into the JET-operation. • An interlock system has been built to cope with the interaction of the DMS with other auxiliary systems. • The system has been commissioned and first example of DMS used to ameliorate a disruption are shown. - Abstract: A new Disruption Mitigation System (DMS) based on Massive Gas Injections (MGI) has been installed at the JET-tokamak. The key component of this system is a fast eddy current driven valve, which is capable of injecting up to 4.6 × 10{sup −3} MPa m{sup 3} in less than 5 ms. Along with this valve a new gas handling system has been installed, whose control had to be integrated into the JET-operation. The operation of the DMS requires interaction with several other systems. Although Massive Gas Injections are used to ameliorate potentially severe damage to the tokamak plant and plasma facing components caused by disruptions, they introduce a high risk for example to auxiliary heating systems or diagnostics, which could be damaged by high vacuum pressures. In addition to this, the presence of high pressure (of noble and flammable gases) in combination with high voltages represents a risk not only to the actual DMS plant itself (in case of a failure) but also to personnel in the vicinity. These varieties of risks have been addressed and are described in this article.

  1. Orion Handling Qualities During ISS Rendezvous and Docking

    Science.gov (United States)

    Hart, Jeremy J.; Stephens, J. P.; Spehar, P.; Bilimoria, K.; Foster, C.; Gonzalex, R.; Sullivan, K.; Jackson, B.; Brazzel, J.; Hart, J.

    2011-01-01

    The Orion spacecraft was designed to rendezvous with multiple vehicles in low earth orbit (LEO) and beyond. To perform the required rendezvous and docking task, Orion must provide enough control authority to perform coarse translational maneuvers while maintaining precision to perform the delicate docking corrections. While Orion has autonomous docking capabilities, it is expected that final approach and docking operations with the International Space Station (ISS) will initially be performed in a manual mode. A series of evaluations was conducted by NASA and Lockheed Martin at the Johnson Space Center to determine the handling qualities (HQ) of the Orion spacecraft during different docking and rendezvous conditions using the Cooper-Harper scale. This paper will address the specifics of the handling qualities methodology, vehicle configuration, scenarios flown, data collection tools, and subject ratings and comments. The initial Orion HQ assessment examined Orion docking to the ISS. This scenario demonstrates the Translational Hand Controller (THC) handling qualities of Orion. During this initial assessment, two different scenarios were evaluated. The first was a nominal docking approach to a stable ISS, with Orion initializing with relative position dispersions and a closing rate of approximately 0.1 ft/sec. The second docking scenario was identical to the first, except the attitude motion of the ISS was modeled to simulate a stress case ( 1 degree deadband per axis and 0.01 deg/sec rate deadband per axis). For both scenarios, subjects started each run on final approach at a docking port-to-port range of 20 ft. Subjects used the THC in pulse mode with cues from the docking camera image, window views, and range and range rate data displayed on the Orion display units. As in the actual design, the attitude of the Orion vehicle was held by the automated flight control system at 0.5 degree deadband per axis. Several error sources were modeled including Reaction

  2. The European contribution to the procurement of the ITER Remote Handling systems

    International Nuclear Information System (INIS)

    Damiani, Carlo; Irving, Mike; Semeraro, Luigi

    2009-01-01

    Fusion for Energy (F4E) will manage the European in-kind contribution of various remote handling (RH) systems for the maintenance of ITER components: (i) the divertor cassette movers, end effectors, manipulator arms and tooling; (ii) 50% of the transfer casks, in particular the air transfer systems and some in-cask devices; (iii) the in-vessel viewing and metrology system (IVVS); (iv) the Neutral Beam (NB) Cell crane, manipulator arms, tooling, Caesium Oven replacement tooling, NB source installation/removal trolley, auxiliary vehicles. A wide range of technologies is involved: special monorail crane, movers, manipulator arms, pipe cutting/welding tooling, special cameras, laser-based metrology devices, control systems, virtual reality. An important aspect to consider is the resistance to radiation levels that range from max ∼10 KGy/h for IVVS down to ∼1 Gy/h for the RH devices operating in the NB cell. Given the unprecedented complexity of the ITER maintenance scenario, a development strategy is being implemented that includes prototyping and testing of RH subsystems before proceeding with the final production for ITER. This paper presents an overview of the various procurement packages, the status of development for each of them, the validation and procurement strategy, including issues like radiation resistance and standardisation policy, and the organisational and managerial challenges in relation with the complex ITER Organisation (IO).

  3. Status of the new WEST plasma control system

    International Nuclear Information System (INIS)

    Ravene, Nathalie; Nouailletas, Rémy; Signoret, Jacqueline; Guillerminet, Bernard; Treutterrer, Wolfgang; Spring, Anett; Masand, Harish; Dhongde, Jasraj; Bhandarkar, Manisha; Rapson, Chris; Laqua, Heike; Lewerentz, Marc; Moreau, Philippe; Brémond, Sylvain; Allegretti, Ludovic; Raupp, Gerhard; Werner, Andreas; Laurent, François Saint; Nardon, Eric

    2016-01-01

    The WEST (W – for Tungsten – Environment in Steady state Tokamak) project is aiming at minimizing technology and operational risks of a full tungsten actively cooled divertor on ITER. It was started in 2013 and consists in transforming the Tore Supra tokamak into an X point divertor device, while taking advantage of its long discharge capability. To operate the next coming operations of WEST, new controllers are required. These developments are an opportunity to develop a new Plasma Control System (PCS) architecture featuring build-in real time handling of both plasma and plants events, thus addressing key ITER needs. The Tore Supra PCS will be refurbished including a new Pulse Schedule Editor (PSE). The main idea is to use a time segmented approach to describe the pulse schedule with a full integration of event handling both on PCS and PSE. Further to detailed requirement specifications and architecture design, two software tools were selected to define and execute a whole plasma discharge defined as a set of time segments. The PCS real-time framework (RTF) is based on an upgraded version of the AUG framework, called DCS (Discharge Control System). The PSE is the Xedit application used on WEGA and under further development for W7-X facility. This paper reports on the status of the new WEST PCS developments. The on-going developments to adapt DCS to the Tore Supra Control infrastructure networks (new real-time network, chronology system and pulse supervision) will be reported. The required preparations for the use of Xedit will be presented, mainly the appropriate formal description of the WEST control system and the implementation of the mapping between the Xedit experiment configuration and DCS configuration files.

  4. Status of the new WEST plasma control system

    Energy Technology Data Exchange (ETDEWEB)

    Ravene, Nathalie, E-mail: nathalie.ravenel@gmail.com [IRFM, CEA, F-13108 Saint Paul lez Durance (France); Nouailletas, Rémy; Signoret, Jacqueline; Guillerminet, Bernard [IRFM, CEA, F-13108 Saint Paul lez Durance (France); Treutterrer, Wolfgang [Max-Planck-Institut für Plasmaphysik, Boltzmannstraße 2, 85748 Garching (Germany); Spring, Anett [Max-Planck-Institut für Plasmaphysik, Teilinstitut Greifswald, Wendelsteinstraße 1, D-17491 Greifswald (Germany); Masand, Harish; Dhongde, Jasraj; Bhandarkar, Manisha [Institute for Plasma Research (IPR), Near Indira Bridge, Bhat, Gandhinagar, 382 428 Gujarat (India); Rapson, Chris [Max-Planck-Institut für Plasmaphysik, Boltzmannstraße 2, 85748 Garching (Germany); Laqua, Heike; Lewerentz, Marc [Max-Planck-Institut für Plasmaphysik, Teilinstitut Greifswald, Wendelsteinstraße 1, D-17491 Greifswald (Germany); Moreau, Philippe; Brémond, Sylvain; Allegretti, Ludovic [IRFM, CEA, F-13108 Saint Paul lez Durance (France); Raupp, Gerhard [Max-Planck-Institut für Plasmaphysik, Boltzmannstraße 2, 85748 Garching (Germany); Werner, Andreas [Max-Planck-Institut für Plasmaphysik, Teilinstitut Greifswald, Wendelsteinstraße 1, D-17491 Greifswald (Germany); Laurent, François Saint; Nardon, Eric [IRFM, CEA, F-13108 Saint Paul lez Durance (France)

    2016-11-15

    The WEST (W – for Tungsten – Environment in Steady state Tokamak) project is aiming at minimizing technology and operational risks of a full tungsten actively cooled divertor on ITER. It was started in 2013 and consists in transforming the Tore Supra tokamak into an X point divertor device, while taking advantage of its long discharge capability. To operate the next coming operations of WEST, new controllers are required. These developments are an opportunity to develop a new Plasma Control System (PCS) architecture featuring build-in real time handling of both plasma and plants events, thus addressing key ITER needs. The Tore Supra PCS will be refurbished including a new Pulse Schedule Editor (PSE). The main idea is to use a time segmented approach to describe the pulse schedule with a full integration of event handling both on PCS and PSE. Further to detailed requirement specifications and architecture design, two software tools were selected to define and execute a whole plasma discharge defined as a set of time segments. The PCS real-time framework (RTF) is based on an upgraded version of the AUG framework, called DCS (Discharge Control System). The PSE is the Xedit application used on WEGA and under further development for W7-X facility. This paper reports on the status of the new WEST PCS developments. The on-going developments to adapt DCS to the Tore Supra Control infrastructure networks (new real-time network, chronology system and pulse supervision) will be reported. The required preparations for the use of Xedit will be presented, mainly the appropriate formal description of the WEST control system and the implementation of the mapping between the Xedit experiment configuration and DCS configuration files.

  5. A multi-component patient-handling intervention improves attitudes and behaviors for safe patient handling and reduces aggression experienced by nursing staff

    DEFF Research Database (Denmark)

    Risør, Bettina Wulff; Casper, Sven Dalgas; Andersen, Lars L.

    2017-01-01

    This study evaluated an intervention for patient-handling equipment aimed to improve nursing staffs' use of patient handling equipment and improve their general health, reduce musculoskeletal problems, aggressive episodes, days of absence and work-related accidents. As a controlled before......-after study, questionnaire data were collected at baseline and 12-month follow-up among nursing staff at intervention and control wards at two hospitals. At 12-month follow-up, the intervention group had more positive attitudes towards patient-handling equipment and increased use of specific patient......-handling equipment. In addition, a lower proportion of nursing staff in the intervention group had experienced physically aggressive episodes. No significant change was observed in general health status, musculoskeletal problems, days of absence or work-related accidents. The intervention resulted in more positive...

  6. Cooperative control system of the floating cranes for the dual lifting

    Directory of Open Access Journals (Sweden)

    Mihee Nam

    2018-01-01

    Full Text Available This paper proposes a dual lifting and its cooperative control system with two different kinds of floating cranes. The Mega-erection and Giga-erection in the ship building are used to handle heavier and wider blocks and modules as ships and off-shore platforms are enlarged. However, there is no equipment to handle such Tera-blocks. In order to overcome the limit on performance of existing floating cranes, the dual lifting is proposed in this research. In the dual lifting, two floating cranes are well-coordinated to add up the lift capabilities of both cranes without any loss such that virtually a single crane is lifting, maneuvering and unloading. Two main constraints for the dual lifting are as follows: First, two barges of floating cranes should be constrained as a rigid body not to cause a relative motion between two barges and main hooks of the two cranes should be controlled as main hooks of a single crane. In order words, it is necessary to develop the cooperative control of two floating cranes in order to sustain a center of gravity of the module and minimize the tilting angle during the lifting and unloading by the two floating cranes. Two floating cranes are handled as a master-slave system. The master crane is able to gather information about all working conditions and make a decision to control the individual hook speed, which communicates the slave crane by TCP/IP. The developed control system has been embedded in the real floating crane systems and the dual lifting has been demonstrated five times at SHI shipyard in 2015. The moving angles of the lifting module are analyzed and verified to be suitable for hoisting control. It is verified that the dual lifting can be applied for many heavier and wider blocks and modules to shorten the construction time of ships and off-shore platforms.

  7. The KSTAR integrated control system based on EPICS

    International Nuclear Information System (INIS)

    Kim, K.H.; Ju, C.J.; Kim, M.K.; Park, M.K.; Choi, J.W.; Kyum, M.C.; Kwon, M.

    2006-01-01

    The Korea Superconducting Tokamak Advanced Research (KSTAR) control system will be developed with several subsystems, which consist of the central control system (e.g. plasma control, machine control, diagnostic control, time synchronization, and interlock systems) and local control systems for various subsystems. We are planning to connect the entire system with several networks, viz. a reflective-memory-based real-time network, an optical timing network, a gigabit Ethernet network for generic machine control, and a storage network. Then it will evolve into a network-based, distributed real-time control system. Thus, we have to consider the standard communication protocols among the subsystems and how to handle the various kinds of hardware in a homogeneous way. To satisfy these requirements, EPICS has been chosen for the KSTAR control. The EPICS framework provides network-based real-time distributed control, operating system independent programming tools, operator interface tools, archiving tools, and interface tools with other commercial and non-commercial software. The most important advantage of the use of the EPICS framework is in providing homogeneity of the system for the control system developer. The developer does not have to be concerned about the specifics of the local system, but can concentrate on the implementation of the control logic with EPICS tools. We will present the details of the integration issues and also will give a brief summary of the entire KSTAR control system from an integration point of view

  8. An Optimized Small Tissue Handling System for Immunohistochemistry and In Situ Hybridization.

    Directory of Open Access Journals (Sweden)

    Giovanni Anthony

    Full Text Available Recent development in 3D printing technology has opened an exciting possibility for manufacturing 3D devices on one's desktop. We used 3D modeling programs to design 3D models of a tissue-handling system and these models were "printed" in a stereolithography (SLA 3D printer to create precision histology devices that are particularly useful to handle multiple samples with small dimensions in parallel. Our system has been successfully tested for in situ hybridization of zebrafish embryos. Some of the notable features include: (1 A conveniently transferrable chamber with 6 mesh-bottomed wells, each of which can hold dozens of zebrafish embryos. This design allows up to 6 different samples to be treated per chamber. (2 Each chamber sits in a well of a standard 6-well tissue culture plate. Thus, up to 36 different samples can be processed in tandem using a single 6 well plate. (3 Precisely fitting lids prevent solution evaporation and condensation, even at high temperatures for an extended period of time: i.e., overnight riboprobe hybridization. (4 Flat bottom mesh maximizes the consistent treatment of individual tissue samples. (5 A magnet-based lifter was created to handle up to 6 chambers (= 36 samples in unison. (6 The largely transparent resin aids in convenient visual inspection both with eyes and using a stereomicroscope. (7 Surface engraved labeling enables an accurate tracking of different samples. (8 The dimension of wells and chambers minimizes the required amount of precious reagents. (9 Flexible parametric modeling enables an easy redesign of the 3D models to handle larger or more numerous samples. Precise dimensions of 3D models and demonstration of how we use our devices in whole mount in situ hybridization are presented. We also provide detailed information on the modeling software, 3D printing tips, as well as 3D files that can be used with any 3D printer.

  9. Robust receding horizon control for networked and distributed nonlinear systems

    CERN Document Server

    Li, Huiping

    2017-01-01

    This book offers a comprehensive, easy-to-understand overview of receding-horizon control for nonlinear networks. It presents novel general strategies that can simultaneously handle general nonlinear dynamics, system constraints, and disturbances arising in networked and large-scale systems and which can be widely applied. These receding-horizon-control-based strategies can achieve sub-optimal control performance while ensuring closed-loop stability: a feature attractive to engineers. The authors address the problems of networked and distributed control step-by-step, gradually increasing the level of challenge presented. The book first introduces the state-feedback control problems of nonlinear networked systems and then studies output feedback control problems. For large-scale nonlinear systems, disturbance is considered first, then communication delay separately, and lastly the simultaneous combination of delays and disturbances. Each chapter of this easy-to-follow book not only proposes and analyzes novel ...

  10. DESIGN AN INTELLIGENT CONTROLLER FOR FULL VEHICLE NONLINEAR ACTIVE SUSPENSION SYSTEMS

    OpenAIRE

    Aldair, A. A.; Wang, W. J.

    2011-01-01

    The main objective of designed the controller for a vehicle suspension system is to reduce the discomfort sensed by passengers which arises from road roughness and to increase the ride handling associated with the pitching and rolling movements. This necessitates a very fast and accurate controller to meet as much control objectives, as possible. Therefore, this paper deals with an artificial intelligence Neuro-Fuzzy (NF) technique to design a robust controller to meet the control objectives....

  11. Flight Test of an Intelligent Flight-Control System

    Science.gov (United States)

    Davidson, Ron; Bosworth, John T.; Jacobson, Steven R.; Thomson, Michael Pl; Jorgensen, Charles C.

    2003-01-01

    The F-15 Advanced Controls Technology for Integrated Vehicles (ACTIVE) airplane (see figure) was the test bed for a flight test of an intelligent flight control system (IFCS). This IFCS utilizes a neural network to determine critical stability and control derivatives for a control law, the real-time gains of which are computed by an algorithm that solves the Riccati equation. These derivatives are also used to identify the parameters of a dynamic model of the airplane. The model is used in a model-following portion of the control law, in order to provide specific vehicle handling characteristics. The flight test of the IFCS marks the initiation of the Intelligent Flight Control System Advanced Concept Program (IFCS ACP), which is a collaboration between NASA and Boeing Phantom Works. The goals of the IFCS ACP are to (1) develop the concept of a flight-control system that uses neural-network technology to identify aircraft characteristics to provide optimal aircraft performance, (2) develop a self-training neural network to update estimates of aircraft properties in flight, and (3) demonstrate the aforementioned concepts on the F-15 ACTIVE airplane in flight. The activities of the initial IFCS ACP were divided into three Phases, each devoted to the attainment of a different objective. The objective of Phase I was to develop a pre-trained neural network to store and recall the wind-tunnel-based stability and control derivatives of the vehicle. The objective of Phase II was to develop a neural network that can learn how to adjust the stability and control derivatives to account for failures or modeling deficiencies. The objective of Phase III was to develop a flight control system that uses the neural network outputs as a basis for controlling the aircraft. The flight test of the IFCS was performed in stages. In the first stage, the Phase I version of the pre-trained neural network was flown in a passive mode. The neural network software was running using flight data

  12. Experience of remote under water handling operations at Tarapur Atomic Power Station

    International Nuclear Information System (INIS)

    Agarwal, S.K.

    1990-01-01

    Each Refuelling outage of Tarapur Atomic Power Station Reactors involves a great deal of remote underwater handling operations using special remote handling tools, working deep down in the reactor vessel under about sixty feet of water and in the narrow confines of highly radioactive core. The remote underwater handling operations include incore and out of core sipping operations, fuel reloading or shuffling, uncoupling of control rod drives, replacement and shuffling of control blades, replacement of local power range monitors, spent fuel shipment in casks, retrieval of fallen or displaced fuel top guide spacers, orifices and their installation, underwater CCTV inspection of reactor internals, core verification, channelling and dechannelling of fuel bundles, inspection of fuel bundles and channels, unbolting and removal of old racks, installation of high density racks, removal and reinstallation of fuel support plugs and guide tubes, underwater cutting of irradiated hardware material and their disposal, fuel reconstitution, removal and reinstallation of system dryer separator etc.. The paper describes in brief the salient experience of remote underwater handling operations at TAPS especially the unusual problems faced and solved, by using special tools, employing specific techniques and by repeated efforts, patience, ingenuity and skills. (author). 10 figs

  13. Mechanization of and experience with a triplex fly-by-wire backup control system

    Science.gov (United States)

    Lock, W. P.; Petersen, W. R.; Whitman, G. B.

    1976-01-01

    A redundant three axis analog control system was designed and developed to back up a digital fly by wire control system for an F-8C airplane. The mechanization and operational experience with the backup control system, the problems involved in synchronizing it with the primary system, and the reliability of the system are discussed. The backup control system was dissimilar to the primary system, and it provided satisfactory handling through the flight envelope evaluated. Limited flight tests of a variety of control tasks showed that control was also satisfactory when the backup control system was controlled by a minimum displacement (force) side stick. The operational reliability of the F-8 digital fly by wire control system was satisfactory, with no unintentional downmodes to the backup control system in flight. The ground and flight reliability of the system's components is discussed.

  14. Simulation-based design process for the verification of ITER remote handling systems

    International Nuclear Information System (INIS)

    Sibois, Romain; Määttä, Timo; Siuko, Mikko; Mattila, Jouni

    2014-01-01

    Highlights: •Verification and validation process for ITER remote handling system. •Simulation-based design process for early verification of ITER RH systems. •Design process centralized around simulation lifecycle management system. •Verification and validation roadmap for digital modelling phase. -- Abstract: The work behind this paper takes place in the EFDA's European Goal Oriented Training programme on Remote Handling (RH) “GOT-RH”. The programme aims to train engineers for activities supporting the ITER project and the long-term fusion programme. One of the projects of this programme focuses on the verification and validation (V and V) of ITER RH system requirements using digital mock-ups (DMU). The purpose of this project is to study and develop efficient approach of using DMUs in the V and V process of ITER RH system design utilizing a System Engineering (SE) framework. Complex engineering systems such as ITER facilities lead to substantial rise of cost while manufacturing the full-scale prototype. In the V and V process for ITER RH equipment, physical tests are a requirement to ensure the compliance of the system according to the required operation. Therefore it is essential to virtually verify the developed system before starting the prototype manufacturing phase. This paper gives an overview of the current trends in using digital mock-up within product design processes. It suggests a simulation-based process design centralized around a simulation lifecycle management system. The purpose of this paper is to describe possible improvements in the formalization of the ITER RH design process and V and V processes, in order to increase their cost efficiency and reliability

  15. Study, design and evaluation of nuclear reactor computer control system

    International Nuclear Information System (INIS)

    Menacer, S.

    1988-01-01

    Nuclear reactor control is a complex process that varies with each reactor and there is no universal agreement as to the best type of control system. After the use of conventional systems for a long time, attention turned towards digital techniques in the reactor control system. This interest emerged because of the difficulties faced in the data manipulation, mainly for post-incident analysis. However, it is not sufficient to insert a computer in a system to solve all the data-handling problems and also the insertion of a computer in a real-time system is not without any effect on the overall system. The scope of this thesis is to show the important parameters that have to be taken into account when choosing and evaluate the performances of the selected system

  16. Cardea: Dynamic Access Control in Distributed Systems

    Science.gov (United States)

    Lepro, Rebekah

    2004-01-01

    Modern authorization systems span domains of administration, rely on many different authentication sources, and manage complex attributes as part of the authorization process. This . paper presents Cardea, a distributed system that facilitates dynamic access control, as a valuable piece of an inter-operable authorization framework. First, the authorization model employed in Cardea and its functionality goals are examined. Next, critical features of the system architecture and its handling of the authorization process are then examined. Then the S A M L and XACML standards, as incorporated into the system, are analyzed. Finally, the future directions of this project are outlined and connection points with general components of an authorization system are highlighted.

  17. Tuning of an optimal fuzzy PID controller with stochastic algorithms for networked control systems with random time delay.

    Science.gov (United States)

    Pan, Indranil; Das, Saptarshi; Gupta, Amitava

    2011-01-01

    An optimal PID and an optimal fuzzy PID have been tuned by minimizing the Integral of Time multiplied Absolute Error (ITAE) and squared controller output for a networked control system (NCS). The tuning is attempted for a higher order and a time delay system using two stochastic algorithms viz. the Genetic Algorithm (GA) and two variants of Particle Swarm Optimization (PSO) and the closed loop performances are compared. The paper shows that random variation in network delay can be handled efficiently with fuzzy logic based PID controllers over conventional PID controllers. Copyright © 2010 ISA. Published by Elsevier Ltd. All rights reserved.

  18. Development of an integrated closed loop control system with virtual reality monitoring for Prototype Robotic Articulated System (PRAS)

    International Nuclear Information System (INIS)

    Rastogi, Naveen; Dutta, Pramit; Gotewal, K.K.

    2015-01-01

    The Prototype Robotic Articulated System (PRAS) is a servo driven 4 degrees of freedom robotic arm capable of handling of upto 5 kg payload. A virtual reality based monitoring application has been developed in blender and was intergrated with the control system to read the joint values of the robotic arm at 10Hz and update the CAD model to visualize the robotic operations remotely. This paper presents the design details and implementation results of the integrated control system for PRAS

  19. Safety issues in robotic handling of nuclear weapon parts

    International Nuclear Information System (INIS)

    Drotning, W.; Wapman, W.; Fahrenholtz, J.

    1993-01-01

    Robotic systems are being developed by the Intelligent Systems and Robotics Center at Sandia National Laboratories to perform automated handling tasks with radioactive weapon parts. These systems will reduce the occupational radiation exposure to workers by automating operations that are currently performed manually. The robotic systems at Sandia incorporate several levels of mechanical, electrical, and software safety for handling hazardous materials. For example, tooling used by the robot to handle radioactive parts has been designed with mechanical features that allow the robot to release its payload only at designated locations in the robotic workspace. In addition, software processes check for expected and unexpected situations throughout the operations. Incorporation of features such as these provides multiple levels of safety for handling hazardous or valuable payloads with automated intelligent systems

  20. On the accuracy and reliability of predictions by control-system theory.

    Science.gov (United States)

    Bourbon, W T; Copeland, K E; Dyer, V R; Harman, W K; Mosley, B L

    1990-12-01

    In three experiments we used control-system theory (CST) to predict the results of tracking tasks on which people held a handle to keep a cursor even with a target on a computer screen. 10 people completed a total of 104 replications of the task. In each experiment, there were two conditions: in one, only the handle affected the position of the cursor; in the other, a random disturbance also affected the cursor. From a person's performance during Condition 1, we derived constants used in the CST model to predict the results of Condition 2. In two experiments, predictions occurred a few minutes before Condition 2; in one experiment, the delay was 1 yr. During a 1-min. experimental run, the positions of handle and cursor, produced by the person, were each sampled 1800 times, once every 1/30 sec. During a modeling run, the model predicted the positions of the handle and target for each of the 1800 intervals sampled in the experimental run. In 104 replications, the mean correlation between predicted and actual positions of the handle was .996; SD = .002.

  1. Large-component handling equipment and its use

    International Nuclear Information System (INIS)

    Krieg, S.A.; Swannack, D.L.

    1983-01-01

    The Fast Flux Test Facility (FFTF) reactor systems have special requirements for component replacements during maintenance servicing. Replacement operations must address handling of equipment within shielded metal containers while maintaining an inert atmosphere to prevent reaction of sodium with air. Plant identification of a failed component results in selecting and assembling the maintenance cask and equipment transport system for transfer from the storage facility to the Reactor Containment Building (RCB). This includes a proper diameter and length cask, inert atmosphere control consoles, component lift fixture and support structure for interface with the facility area surrounding the component. This equipment is staged in modular groups in the Reactor Service Building for transfer through the equipment airlock to the containment interior. The failed component is generally prepared for replacement by installation of the special lifting fixture attachment. Assembly of the cask support structure is performed over the component position on the containment building operating floor. The cask and shroud from the reactor interface are inerted after all manual service connections and handling attachments are completed. The component is lifted from the reactor and into the cask interior through a floor valve which is then closed to isolate the component reactor port. The cask with sodium wetted component is transferred to a service/repair location, either within containment or outside, to the Maintenance Facility cleaning and repair area. The complete equipment and handling operations for replacement of a large reactor component are described

  2. The development and evaluation of a stereoscopic television system for remote handling

    International Nuclear Information System (INIS)

    Dumbreck, A.A.; Murphy, S.P.; Smith, C.W.

    1990-01-01

    This paper describes the development and evaluation of a stereoscopic television system at Harwell Laboratory. The theory of stereo image geometry is outlined, and criteria for the matching of stereoscopic pictures are given. A stereoscopic television system designed for remote handling tasks has been produced, it provides two selectable angles of view and variable convergence, the display is viewed via polarizing spectacles. Evaluations have indicated improved performance with no problems of operator fatigue over a wide range of applications. (author)

  3. Conceptual design of a generic pulse schedule and event handling editor for improved fusion device operation

    International Nuclear Information System (INIS)

    Barana, Oliviero; Nouailletas, Rémy; Brémond, Sylvain; Moreau, Philippe; Allegretti, Ludovic; Balme, Stéphane; Ravenel, Nathalie; Mannori, Simone; Guillerminet, Bernard; Leroux, Fabrice; Douai, David; Nardon, Eric; Hertout, Patrick; Saint-Laurent, François

    2013-01-01

    Highlights: ► Real-time event handling requires extended functionalities of pulse schedule editors and plasma control systems ► A new pulse schedule editor, conceived for parameterization of systematic off-normal event handling, is described ► A global, generic approach on off-normal event handling is highlighted ► The functional architecture of an off-normal event handling oriented plasma control system is discussed ► The main objects of the pulse schedule editor are the segment-descriptor object and the scenario-descriptor object. -- Abstract: Coping with unexpected events is an important issue of nuclear fusion experiments. The future machines, characterized by very long plasma discharges and actively cooled metallic plasma-facing components, will require a systematic intervention in real time, in order to maximize the performance and protect the investment. The real-time management of events will require extending the functionalities of the current pulse schedule editors with the possibility of using reference waveforms provided with acceptability margins and setting up advanced mitigation strategies and event countermeasures. With this purpose, a new pulse schedule editor, based on a time-segment approach for the preparation of experimental scenarios, is being conceived on Tore Supra, together with a new plasma control system. This paper will report on their conceptual design and give account of the preliminary results of a feasibility study currently under way in order to prepare a possible implementation on Tore Supra

  4. Conceptual design of a generic pulse schedule and event handling editor for improved fusion device operation

    Energy Technology Data Exchange (ETDEWEB)

    Barana, Oliviero, E-mail: oliviero.barana@cea.fr [CEA, IRFM, F-13108 Saint-Paul-Lez Durance (France); Nouailletas, Rémy; Brémond, Sylvain; Moreau, Philippe; Allegretti, Ludovic; Balme, Stéphane; Ravenel, Nathalie [CEA, IRFM, F-13108 Saint-Paul-Lez Durance (France); Mannori, Simone [ENEA C.R. Brasimone, 40032 Camugnano (Italy); Guillerminet, Bernard; Leroux, Fabrice; Douai, David; Nardon, Eric; Hertout, Patrick; Saint-Laurent, François [CEA, IRFM, F-13108 Saint-Paul-Lez Durance (France)

    2013-10-15

    Highlights: ► Real-time event handling requires extended functionalities of pulse schedule editors and plasma control systems ► A new pulse schedule editor, conceived for parameterization of systematic off-normal event handling, is described ► A global, generic approach on off-normal event handling is highlighted ► The functional architecture of an off-normal event handling oriented plasma control system is discussed ► The main objects of the pulse schedule editor are the segment-descriptor object and the scenario-descriptor object. -- Abstract: Coping with unexpected events is an important issue of nuclear fusion experiments. The future machines, characterized by very long plasma discharges and actively cooled metallic plasma-facing components, will require a systematic intervention in real time, in order to maximize the performance and protect the investment. The real-time management of events will require extending the functionalities of the current pulse schedule editors with the possibility of using reference waveforms provided with acceptability margins and setting up advanced mitigation strategies and event countermeasures. With this purpose, a new pulse schedule editor, based on a time-segment approach for the preparation of experimental scenarios, is being conceived on Tore Supra, together with a new plasma control system. This paper will report on their conceptual design and give account of the preliminary results of a feasibility study currently under way in order to prepare a possible implementation on Tore Supra.

  5. Industrial Cost-Benefit Assessment for Fault-tolerant Control Systems

    DEFF Research Database (Denmark)

    Thybo, Claus; Blanke, Mogens

    1998-01-01

    Economic aspects are decisive for industrial acceptance of research concepts including the promising ideas in fault tolerant control. Fault tolerance is the ability of a system to detect, isolate and accommodate a fault, such that simple faults in a sub-system do not develop into failures...... at a system level. In a design phase for an industrial system, possibilities span from fail safe design where any single point failure is accommodated by hardware, over fault-tolerant design where selected faults are handled without extra hardware, to fault-ignorant design where no extra precaution is taken...

  6. Repository waste-handling operations, 1998

    International Nuclear Information System (INIS)

    Cottam, A.E.; Connell, L.

    1986-04-01

    The Civilian Radioactive Waste Management Program Mission Plan and the Generic Requirements for a Mined Geologic Disposal System state that beginning in 1998, commercial spent fuel not exceeding 70,000 metric tons of heavy metal, or a quantity of solidified high-level radioactive waste resulting from the reprocessing of such a quantity of spent fuel, will be shipped to a deep geologic repository for permanent storage. The development of a waste-handling system that can process 3000 metric tons of heavy metal annually will require the adoption of a fully automated approach. The safety and minimum exposure of personnel will be the prime goals of the repository waste handling system. A man-out-of-the-loop approach will be used in all operations including the receipt of spent fuel in shipping casks, the inspection and unloading of the spent fuel into automated hot-cell facilities, the disassembly of spent fuel assemblies, the consolidation of fuel rods, and the packaging of fuel rods into heavy-walled site-specific containers. These containers are designed to contain the radionuclides for up to 1000 years. The ability of a repository to handle more than 6000 pressurized water reactor spent-fuel rods per day on a production basis for approximately a 23-year period will require that a systems approach be adopted that combines space-age technology, robotics, and sophisticated automated computerized equipment. New advanced inspection techniques, maintenance by robots, and safety will be key factors in the design, construction, and licensing of a repository waste-handling facility for 1998

  7. ACHEMA '85: Process control systems

    International Nuclear Information System (INIS)

    Rosskopf, E.

    1985-01-01

    The strategy obviously adopted by the well-established manufacturers is to offer 'easy-to-handle' equipment to gain new customers, and there is a variety of new compact systems or personal computers being put on the market. The changes and improvements within the processing sector proceed more or less in silence; high-capacity storage devices and multiprocessor configurations are obtainable at a moderate price, offering a greater variety of basic functions and enhanced control possibilities. Redundancy problems are handled with greater flexibility, and batch programs are advancing. Data communication has become a common feature, transmission speed and bus length have been improved. Important improvements have been made with regard to data display; even medium-sized equipment now offer the possibility of making dynamic flow-sheets and reserving space for process history display, and the hierarchy of displays has been considerably simplified. The user software also has been made more easy, 'fill-in-the-blancs' is the prevailing motto for dialog configurations, and such big terms as process computer' or 'programming skill' are passing into oblivion. (orig./HP) [de

  8. Towards a better mastery of risks in the handling of nuclear fuel: the contributions of ergonomics

    International Nuclear Information System (INIS)

    Samson, L.

    1999-01-01

    Nuclear fuel is handled under water in the reactor pool using procedures that have yet to be automated. The knowledge and skill of the operators is therefore of prime importance. Ergonomic consultants have prepared a report on the problems facing the operators when handling nuclear fuel? These problems have been addressed by the installation of a new system to detect and prevent incorrect operator commands and to provide software assistance in planning movements together with diagnostic functions. The new system has resulted in considerable time savings and a reduction in the risk of error. However, it has been necessary to modify the control software in the light of the handling strategies traditionally used by the operators. (author)

  9. Evaluation of Control and Protection System for Loss of Electrical Power Supply System of Water-Cooling Nuclear Power Plant

    International Nuclear Information System (INIS)

    Suhaemi, Tjipta; Djen Djen; Setyono; Jambiar, Riswan; Rozali, Bang; Setyo P, Dwi; Tjahyono, Hendro

    2000-01-01

    Evaluation of control and protection system for loss of electrical power supply system of water-cooled nuclear power plant has been done. The loss of electrical power supply. The accident covered the loss of external electrical load and loss of ac power to the station auxiliaries. It is analysed by studying and observing the mechanism of electrical power system and mechanism of related control and protection system. The are two condition used in the evaluation i e without turbine trip and with turbine trip. From the evaluation it is concluded that the control and protection system can handled the failure caused by the loss of electrical power system

  10. Execution Constraint Verification of Exception Handling on UML Sequence Diagrams

    NARCIS (Netherlands)

    Ciraci, S.; Sözer, Hasan; Aksit, Mehmet; Havinga, W.K.

    2011-01-01

    Exception handling alters the control flow of the program. As such, errors introduced in exception handling code may influence the overall program in undesired ways. To detect such errors early and thereby decrease the programming costs, it is worthwhile to consider exception handling at design

  11. Scheduling algorithms for automatic control systems for technological processes

    Science.gov (United States)

    Chernigovskiy, A. S.; Tsarev, R. Yu; Kapulin, D. V.

    2017-01-01

    Wide use of automatic process control systems and the usage of high-performance systems containing a number of computers (processors) give opportunities for creation of high-quality and fast production that increases competitiveness of an enterprise. Exact and fast calculations, control computation, and processing of the big data arrays - all of this requires the high level of productivity and, at the same time, minimum time of data handling and result receiving. In order to reach the best time, it is necessary not only to use computing resources optimally, but also to design and develop the software so that time gain will be maximal. For this purpose task (jobs or operations), scheduling techniques for the multi-machine/multiprocessor systems are applied. Some of basic task scheduling methods for the multi-machine process control systems are considered in this paper, their advantages and disadvantages come to light, and also some usage considerations, in case of the software for automatic process control systems developing, are made.

  12. CERN Sells its Electronic Document Handling System

    CERN Multimedia

    2001-01-01

    The EDH team. Left to right: Derek Mathieson, Rotislav Titov, Per Gunnar Jonsson, Ivica Dobrovicova, James Purvis. Missing from the photo is Jurgen De Jonghe. In a 1 MCHF deal announced this week, the British company Transacsys bought the rights to CERN's Electronic Document Handling (EDH) system, which has revolutionised the Laboratory's administrative procedures over the last decade. Under the deal, CERN and Transacsys will collaborate on developing EDH over the coming 12 months. CERN will provide manpower and expertise and will retain the rights to use EDH, which will also be available freely to other particle physics laboratories. This development is an excellent example of the active technology transfer policy CERN is currently pursuing. The negotiations were carried out through a fruitful collaboration between AS and ETT Divisions, following the recommendations of the Technology Advisory Board, and with the help of SPL Division. EDH was born in 1991 when John Ferguson and Achille Petrilli of AS Divisi...

  13. Effect of push handle height on net moments and forces on the musculoskeletal system during standardized wheelchair pushing tasks

    NARCIS (Netherlands)

    Van Der Woude, L H; Van Koningsbruggen, C M; Kroes, A L; Kingma, I

    1995-01-01

    The aim of this investigation was to analyze the external forces and biomechanical loading on the musculoskeletal system during wheelchair pushing, in relation to different push handle heights. In addition, recommendations for wheelchair pushing in accordance with push handle height are made. Eight

  14. Project Plan 7930 Cell G PaR Remote Handling System Replacement

    International Nuclear Information System (INIS)

    Kinney, Kathryn A.

    2009-01-01

    For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ( 252 Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for 252 Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for 252 Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and

  15. Control system and environmental parameters monitoring of the Tandetron Accelerator clean room; Sistema de control y monitoreo de parametros ambientales del cuarto limpio del acelerador Tandetron

    Energy Technology Data Exchange (ETDEWEB)

    Mejia V, M.E.; Garcia H, J.M.; Flores M, J. [ININ, Departamento de Sistemas Electronicos, 52750 La Marquesa, Estado de Mexico (Mexico)]. e-mail: mmejia@nuclear.inin.mx

    2007-07-01

    A control system and monitoring of humidity and temperature implemented by means of a system based on a microcontroller, an intelligent sensor and a stage of power for the actuators handling is described. The change of the levels of reference of the control system and the monitoring of the physical controlled variables can be carried out from any connected computer to a local net or Internet. (Author)

  16. INFN-CNAF Monitor and Control System

    International Nuclear Information System (INIS)

    Antonelli, Stefano; De Girolamo, Donato; Dell'Agnello, Luca; Gregori, Daniele; Guizzunti, Guido; Ricci, Pier Paolo; Rosso, Felice; Sapunenko, Vladimir; Veraldi, Riccardo; Veronesi, Paolo; Vistoli, Cristina; Finzi, Giulia Vita; Zani, Stefano

    2011-01-01

    CNAF is the national center of National Institute of Nuclear Physics (INFN) for R and D in the field of Information Technologies applied to High Energy Physics (HEP) experiments. It is involved in the management and development of the most important information and data handling services in behalf of the INFN. In 2005, the Italian Tier-1 for Large Hadron Collider (LHC) experiments has been inaugurated at INFN-CNAF. Due to the huge complexity of Tier-1 center, the use of control systems is fundamental for management and operation of the center. At INFN-CNAF, several solutions have been adopted, from commercial to open source products up to entirely home-made systems. Adopted open source solutions have been strongly adapted to specific needs; a wide set of customized sensors has been developed for various divisions like Network, Storage, Farming, Grid operation and National Services. Finally, a dashboard has been developed, to which described control systems send critical alarms (sent via sms to an operator as well). The dashboard can be exploited to get an historical view of the Tier-1 and national services' state and to allow a quick web control. In this article, the whole system, adopted customizations in monitoring and control as well as their integrations with the dashboard will be described.

  17. Distributed Adaptive Neural Control for Stochastic Nonlinear Multiagent Systems.

    Science.gov (United States)

    Wang, Fang; Chen, Bing; Lin, Chong; Li, Xuehua

    2016-11-14

    In this paper, a consensus tracking problem of nonlinear multiagent systems is investigated under a directed communication topology. All the followers are modeled by stochastic nonlinear systems in nonstrict feedback form, where nonlinearities and stochastic disturbance terms are totally unknown. Based on the structural characteristic of neural networks (in Lemma 4), a novel distributed adaptive neural control scheme is put forward. The raised control method not only effectively handles unknown nonlinearities in nonstrict feedback systems, but also copes with the interactions among agents and coupling terms. Based on the stochastic Lyapunov functional method, it is indicated that all the signals of the closed-loop system are bounded in probability and all followers' outputs are convergent to a neighborhood of the output of leader. At last, the efficiency of the control method is testified by a numerical example.

  18. Data acquisition and control system with a programmable logic controller (PLC) for a pulsed chemical oxygen-iodine laser

    Science.gov (United States)

    Yu, Haijun; Li, Guofu; Duo, Liping; Jin, Yuqi; Wang, Jian; Sang, Fengting; Kang, Yuanfu; Li, Liucheng; Wang, Yuanhu; Tang, Shukai; Yu, Hongliang

    2015-02-01

    A user-friendly data acquisition and control system (DACS) for a pulsed chemical oxygen -iodine laser (PCOIL) has been developed. It is implemented by an industrial control computer,a PLC, and a distributed input/output (I/O) module, as well as the valve and transmitter. The system is capable of handling 200 analogue/digital channels for performing various operations such as on-line acquisition, display, safety measures and control of various valves. These operations are controlled either by control switches configured on a PC while not running or by a pre-determined sequence or timings during the run. The system is capable of real-time acquisition and on-line estimation of important diagnostic parameters for optimization of a PCOIL. The DACS system has been programmed using software programmable logic controller (PLC). Using this DACS, more than 200 runs were given performed successfully.

  19. An electro-hydraulic servo control system research for CFETR blanket RH

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Changqi [Hefei University of Technology, Hefei 230009, Anhui (China); Tang, Hongjun, E-mail: taurustang@126.com [Hefei University of Technology, Hefei 230009, Anhui (China); Qi, Songsong [Hefei University of Technology, Hefei 230009, Anhui (China); Cheng, Yong; Feng, Hansheng; Peng, Xuebing; Song, Yuntao [Institute of Plasma Physics Chinese Academy of Sciences, Hefei 230031, Anhui (China)

    2014-11-15

    Highlights: • We discussed the conceptual design of CFETR blanket RH maintenance system. • The mathematical model of electro-hydraulic servo system was calculated. • A fuzzy adaptive PD controller was designed based on control theory and experience. • The co-simulation models of the system were established with AMESim/Simulink. • The fuzzy adaptive PD algorithm was designed as the core strategy of the system. - Abstract: Based on the technical design requirements of China Fusion Engineering Test Reactor (CFETR) blanket remote handling (RH) maintenance, this paper focus on the control method of achieving high synchronization accuracy of electro-hydraulic servo system. Based on fuzzy control theory and practical experience, a fuzzy adaptive proportional-derivative (PD) controller was designed. Then a more precise co-simulation model was established with AMESim/Simulink. Through the analysis of simulation results, a fuzzy adaptive PD control algorithm was designed as the core strategy of electro-hydraulic servo control system.

  20. An electro-hydraulic servo control system research for CFETR blanket RH

    International Nuclear Information System (INIS)

    Chen, Changqi; Tang, Hongjun; Qi, Songsong; Cheng, Yong; Feng, Hansheng; Peng, Xuebing; Song, Yuntao

    2014-01-01

    Highlights: • We discussed the conceptual design of CFETR blanket RH maintenance system. • The mathematical model of electro-hydraulic servo system was calculated. • A fuzzy adaptive PD controller was designed based on control theory and experience. • The co-simulation models of the system were established with AMESim/Simulink. • The fuzzy adaptive PD algorithm was designed as the core strategy of the system. - Abstract: Based on the technical design requirements of China Fusion Engineering Test Reactor (CFETR) blanket remote handling (RH) maintenance, this paper focus on the control method of achieving high synchronization accuracy of electro-hydraulic servo system. Based on fuzzy control theory and practical experience, a fuzzy adaptive proportional-derivative (PD) controller was designed. Then a more precise co-simulation model was established with AMESim/Simulink. Through the analysis of simulation results, a fuzzy adaptive PD control algorithm was designed as the core strategy of electro-hydraulic servo control system

  1. Simulator for candu600 fuel handling system. the experimental model

    International Nuclear Information System (INIS)

    Marinescu, N.; Predescu, D.; Valeca, S.

    2013-01-01

    A main way to increase the nuclear plant safety is related to selection and continuous training of the operation staff. In this order, the computer programs for training, testing and evaluation of the knowledge get, or training simulators including the advanced analytical models of the technological systems are using. The Institute for Nuclear Research from Pitesti, Romania intend to design and build an Fuel Handling Simulator at his F/M Head Test Rig facility, that will be used for training of operating personnel. This paper presents simulated system, advantages to use the simulator, and the experimental model of simulator, that has been built to allows setting of the requirements and fabrication details, especially for the software kit that will be designed and implement on main simulator. (authors)

  2. The Low-Level Control System for the CERN PS Multi-Turn Extraction Kickers

    CERN Document Server

    Schipper, J; Boucly, C; Carlier, E; Fowler, T; Gaudillet, H; Noulibos, R; Sermeus, L

    2010-01-01

    To reduce the beam losses when preparing high intensity proton beam for the CERN Neutrino to Gran Sasso (CNGS) facility, a new Multi-Turn extraction (MTE) scheme has been implemented in the PS, to replace the present Continuous Transfer (CT) to the SPS. Industrial off-the-shelf components have been used for the low-level part of the MTE kicker control system. National Instruments PXI systems are used to control the high voltage pulse generators and a SIEMENS programmable logic controller (PLC) handles the centralised oil cooling and gas insulation sub-systems

  3. Development of EPICS Input Output Controller and User Interface for the PEFP Low Level RF Control System

    International Nuclear Information System (INIS)

    Song, Young Gi; Kim, Han Sung; Seol, Kyung Tae; Kwon, Hyeok Jung; Cho, Yong Sub

    2010-01-01

    The Low-Level RF (LLRF) control system of the Proton Engineering Frontier Project (PEFP) was developed for handling the driving frequency for Quadrupole (RFQ) and the Draft Tube Linac (DTL) cavities in 2006. The RF amplitude and phase of the accelerating field were controlled within 1% and 1 degree by stability requirements, respectively. Operators have been using the LLRF control system under the windows based text console mode as an operator interface. The LLRF control system could not be integrated with Experimental Physics Industrial Control System (EPICS) Input Output Controllers (IOC) for each subsection of PEFP facility. The main objective of this study is to supply operators of the LLRF control system with user friendly and convenient operating environment. The new LLRF control system is composed of a Verse Module Eurocard (VME) baseboard, a PCI Mezzanine Card (PMC), Board Support Package (BSP), EPICS software tool and a Real-Time Operating System (RTOS) VxWorks. A test with a dummy cavity of the new LLRF control system shows that operators can control and monitor operation parameters for a desired feedback action by using EPICS Channel Access (CA).

  4. Development of EPICS Input Output Controller and User Interface for the PEFP Low Level RF Control System

    Energy Technology Data Exchange (ETDEWEB)

    Song, Young Gi; Kim, Han Sung; Seol, Kyung Tae; Kwon, Hyeok Jung; Cho, Yong Sub [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2010-05-15

    The Low-Level RF (LLRF) control system of the Proton Engineering Frontier Project (PEFP) was developed for handling the driving frequency for Quadrupole (RFQ) and the Draft Tube Linac (DTL) cavities in 2006. The RF amplitude and phase of the accelerating field were controlled within 1% and 1 degree by stability requirements, respectively. Operators have been using the LLRF control system under the windows based text console mode as an operator interface. The LLRF control system could not be integrated with Experimental Physics Industrial Control System (EPICS) Input Output Controllers (IOC) for each subsection of PEFP facility. The main objective of this study is to supply operators of the LLRF control system with user friendly and convenient operating environment. The new LLRF control system is composed of a Verse Module Eurocard (VME) baseboard, a PCI Mezzanine Card (PMC), Board Support Package (BSP), EPICS software tool and a Real-Time Operating System (RTOS) VxWorks. A test with a dummy cavity of the new LLRF control system shows that operators can control and monitor operation parameters for a desired feedback action by using EPICS Channel Access (CA).

  5. Overview of MFTF supervisory control and diagnostics system software

    International Nuclear Information System (INIS)

    Ng, W.C.

    1979-01-01

    The Mirror Fusion Test Facility (MFTF) at the Lawrence Livermore Laboratory (LLL) is currently the largest mirror fusion research project in the world. Its Control and Diagnostics System is handled by a distributed computer network consisting of nine Interdata minicomputer systems and about 65 microprocessors. One of the design requirements is tolerance of single-point failure. If one of the computer systems becomes inoperative, the experiment can still be carried out, although the system responsiveness to operator command may be degraded. In a normal experiment cycle, the researcher can examine the result of the previous experiment, change any control parameter, fire a shot, collect four million bytes of diagnostics data, perform intershot analysis, and have the result presented - all within five minutes. The software approach adopted for the Supervisory Control and Diagnostics System features chief programmer teams and structured programming. Pascal is the standard programming language in this project

  6. Treatment of plutonium-contaminated solid waste: a review of handling systems

    International Nuclear Information System (INIS)

    Meredith, B.E.; Hardy, A.R.

    1985-02-01

    Handling techniques are reviewed to identify those suitable for adaptation for use in transporting large items of redundant plutonium contaminated plant and equipment to a remotely operated size reduction facility, moving them into the facility, presenting them to size reduction equipment and loading the processed waste into drums. It is concluded that an integrated system based on a combination of slatted conveyors, roller tables, air transporters and manipulators, merits further consideration. An appropriate experimental programme is outlined. (author)

  7. The Architecture of the CMS Level-1 Trigger Control and Monitoring System

    CERN Document Server

    Magrans de Abril, Marc; Hammer, Josef; Hartl, Christian; Xie, Zhen

    2011-01-01

    The architecture of the Level-1 Trigger Control and Monitoring system for the CMS experiment is presented. This system has been installed and commissioned on the trigger online computers and is currently used for data taking at the LHC. This is a medium-size distributed system that runs over 40 PCs and 200 processes that control about 4000 electronic boards. It has been designed to handle the trigger configuration and monitoring during data taking as well as all communications with the main run control of CMS. Furthermore its design has foreseen the provision of the software infrastructure for detailed testing of the trigger system during beam down time.

  8. Operational, control and protective system transient analyses of the closed-cycle GT-HTGR power plant

    International Nuclear Information System (INIS)

    Openshaw, F.L.; Chan, T.W.

    1980-07-01

    This paper presents a description of the analyses of the control/protective system preliminary designs for the gas turbine high-temperature gas-cooled reactor (GT-HTGR) power plant. The control system is designed to regulate reactor power, control electric load and turbine speed, control the temperature of the helium delivered to the turbines, and control thermal transients experienced by the system components. In addition, it provides the required control programming for startup, shutdown, load ramp, and other expected operations. The control system also handles conditions imposed on the system during upset and emergency conditions such as loop trip, reactor trip, or electrical load rejection

  9. A Perspective on Equipment Design for Fusion Remote Handling

    International Nuclear Information System (INIS)

    Mills, S.; Haist, B.; Hamilton, D.

    2006-01-01

    For 8 years, JET remote operations have become more capable and confident. Many tasks have been successfully completed, even those never intended to be remote maintenance activities. The general approach to the provision of remote handling equipment at JET has been the preferred use of commercially-off-the-shelf equipment. In the areas of electrical, electronic, software and control this approach has been generally achievable. However, in the area of mechanical equipment it has been more difficult. In particular the RH tooling has been almost entirely bespoke as its requirements are highly sensitive to the design of the JET component being handled and there are many design variations. Hence, JET has required the design and manufacture of over 700 types of bespoke RH equipment. This paper will discuss the experience of introducing and developing remote handling mechanical equipment for JET. The paper will cover the relationship between the remote handling equipment and the JET component design and the potential for improving the design function. A major lesson from the introduction of remote handling to JET has been demonstration of the very close interdependency of the design of JET components with design of remote handling tooling. The JET remote handling manual was originally introduced as the vehicle to ensure remote handling compatibility by the introduction of standards. Experience has shown that in general the remote handling manual approach has been insufficient. Future fusion machines will be much more complex than JET and will demand even greater remote handling compatibility. This paper will discuss possible methods for improving this process. Equipment operating in a high radiation environment must be dependable It may spend part of its time in areas that would be extremely difficult to recover from in the case of failure. The equipment may also have a high duty cycle to minimise shutdown times and probably cannot be manually inspected on a frequent

  10. Computer-controlled system for rapid soil analysis of 226Ra

    International Nuclear Information System (INIS)

    Doane, R.W.; Berven, B.A.; Blair, M.S.

    1984-01-01

    A computer-controlled multichannel analysis system has been developed by the Radiological Survey Activities Group at Oak Ridge National Laboratory (ORNL) for the Department of Energy (DOE) in support of the DOE's remedial action programs. The purpose of this system is to provide a rapid estimate of the 226 Ra concentration in soil samples using a 6 x 9-in. NaI(Tl) crystal containing a 3.25-in. deep by 3.5-in. diameter well. This gamma detection system is controlled by a mini-computer with a dual floppy disk storage medium. A two-chip interface was also designed at ORNL which handles all control signals generated from the computer keyboard. These computer-generated control signals are processed in machine language for rapid data transfer and BASIC language is used for data processing

  11. DDOS ATTACK DETECTION SIMULATION AND HANDLING MECHANISM

    Directory of Open Access Journals (Sweden)

    Ahmad Sanmorino

    2013-11-01

    Full Text Available In this study we discuss how to handle DDoS attack that coming from the attacker by using detection method and handling mechanism. Detection perform by comparing number of packets and number of flow. Whereas handling mechanism perform by limiting or drop the packets that detected as a DDoS attack. The study begins with simulation on real network, which aims to get the real traffic data. Then, dump traffic data obtained from the simulation used for detection method on our prototype system called DASHM (DDoS Attack Simulation and Handling Mechanism. From the result of experiment that has been conducted, the proposed method successfully detect DDoS attack and handle the incoming packet sent by attacker.

  12. Manual materials handling: the cause of over-exertion injury and illness in industry.

    Science.gov (United States)

    Chaffin, D B

    1979-01-01

    It is reported from various sources that overexertion due to lifting, pushing, pulling, and carrying objects accounts for about 27 percent of all compensable industrial injury and illness in the United States. Resulting strain/sprain injuries account for over 50 percent of workmen's compensation clams in many industries. Almont two-thirds of these involve back pain, with reported compensation and medical payments totaling well over one billion dollars annually in the U.S. An estimated 300,000 plus workers will be affected each year, 5 to 10 percent of whom will have a permanent disability and often will be unemployable. This paper attempts to describe four basic approaches used to study this occupational health problem. In so doing, a concerted effort is made to identifiy the gaps in knowledge which need to be more fully researched. The approaches utilized to understand and control the hazards of manual materials handling are: 1) epidemiological studies of job and worker attributes to identify those that individually and in combination cause musculoskeletal incidents, 2) psychophysical studies to ascertain the volitional tolerance of workers to the stress mitigated by manual materials-handling activities, 3) biomechanical studies of the musculoskeletal system during common exertions required in manual materials-handling activities, and 4) physiological studies of the strain imposed on the cardiovascular system during repeated load-handling activities. The state of knowledge from each of these approaches is summarized briefly, and a case is made that much research is still needed to substantiate the necessary controls to lessen the economic burden and human suffering associated with manual materials-handling acts in industry.

  13. Worklist handling in workflow-enabled radiological application systems

    Science.gov (United States)

    Wendler, Thomas; Meetz, Kirsten; Schmidt, Joachim; von Berg, Jens

    2000-05-01

    For the next generation integrated information systems for health care applications, more emphasis has to be put on systems which, by design, support the reduction of cost, the increase inefficiency and the improvement of the quality of services. A substantial contribution to this will be the modeling. optimization, automation and enactment of processes in health care institutions. One of the perceived key success factors for the system integration of processes will be the application of workflow management, with workflow management systems as key technology components. In this paper we address workflow management in radiology. We focus on an important aspect of workflow management, the generation and handling of worklists, which provide workflow participants automatically with work items that reflect tasks to be performed. The display of worklists and the functions associated with work items are the visible part for the end-users of an information system using a workflow management approach. Appropriate worklist design and implementation will influence user friendliness of a system and will largely influence work efficiency. Technically, in current imaging department information system environments (modality-PACS-RIS installations), a data-driven approach has been taken: Worklist -- if present at all -- are generated from filtered views on application data bases. In a future workflow-based approach, worklists will be generated by autonomous workflow services based on explicit process models and organizational models. This process-oriented approach will provide us with an integral view of entire health care processes or sub- processes. The paper describes the basic mechanisms of this approach and summarizes its benefits.

  14. Applications of modern control systems in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Wilhelm, H [Brown, Boveri und Cie A.G., Mannheim (Germany, F.R.). Abt. GK/TE

    1980-10-01

    A new generation of automation and control systems are currently becoming commercially available in the power plant market which, because of their incorporation of microprocessors and bus data transmission systems, represent a major step forward in innovation. The application of these systems meets today's requirements and solutions, for the number of measurements to be performed has increased five or sixfold in the past few years, and the number of drive systems to be controlled has doubled or even tripled. Requirements to be met by process management systems have become vastly more complicated: peak load operation, short startup times, improved communication, and rising safety and reliability requirements, especially in nuclear power plants. Control concepts have been developed for the area relevant to reactor safety and for the whole of the plant, which make full use of the possibilities offered by plant systems. More stringent demands must be met especially in the areas of handling, communication, testing capability, improved function, and flexibility and modular design in the safety sector.

  15. Expert system driven fuzzy control application to power reactors

    International Nuclear Information System (INIS)

    Tsoukalas, L.H.; Berkan, R.C.; Upadhyaya, B.R.; Uhrig, R.E.

    1990-01-01

    For the purpose of nonlinear control and uncertainty/imprecision handling, fuzzy controllers have recently reached acclaim and increasing commercial application. The fuzzy control algorithms often require a ''supervisory'' routine that provides necessary heuristics for interface, adaptation, mode selection and other implementation issues. Performance characteristics of an on-line fuzzy controller depend strictly on the ability of such supervisory routines to manipulate the fuzzy control algorithm and enhance its control capabilities. This paper describes an expert system driven fuzzy control design application to nuclear reactor control, for the automated start-up control of the Experimental Breeder Reactor-II. The methodology is verified through computer simulations using a valid nonlinear model. The necessary heuristic decisions are identified that are vitally important for the implemention of fuzzy control in the actual plant. An expert system structure incorporating the necessary supervisory routines is discussed. The discussion also includes the possibility of synthesizing the fuzzy, exact and combined reasoning to include both inexact concepts, uncertainty and fuzziness, within the same environment

  16. 46 CFR 151.25-2 - Cargo handling space.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...

  17. Remote handling facility and equipment used for space truss assembly

    International Nuclear Information System (INIS)

    Burgess, T.W.

    1987-01-01

    The ACCESS truss remote handling experiments were performed at Oak Ridge National Laboratory's (ORNL's) Remote Operation and Maintenance Demonstration (ROMD) facility. The ROMD facility has been developed by the US Department of Energy's (DOE's) Consolidated Fuel Reprocessing Program to develop and demonstrate remote maintenance techniques for advanced nuclear fuel reprocessing equipment and other programs of national interest. The facility is a large-volume, high-bay area that encloses a complete, technologically advanced remote maintenance system that first began operation in FY 1982. The maintenance system consists of a full complement of teleoperated manipulators, manipulator transport systems, and overhead hoists that provide the capability of performing a large variety of remote handling tasks. This system has been used to demonstrate remote manipulation techniques for the DOE, the Power Reactor and Nuclear Fuel Development Corporation (PNC) of Japan, and the US Navy in addition to the National Aeronautics and Space Administration. ACCESS truss remote assembly was performed in the ROMD facility using the Central Research Laboratory's (CRL) model M-2 servomanipulator. The model M-2 is a dual-arm, bilateral force-reflecting, master/slave servomanipulator which was jointly developed by CRL and ORNL and represents the state of the art in teleoperated manipulators commercially available in the United States today. The model M-2 servomanipulator incorporates a distributed, microprocessor-based digital control system and was the first successful implementation of an entirely digitally controlled servomanipulator. The system has been in operation since FY 1983. 3 refs., 2 figs

  18. Quality assurance system in the production process of the gamma shielding devices used for transport and handling of radiopharmaceuticals and labelled compounds at Cuba

    International Nuclear Information System (INIS)

    Zuniga Santana, Juan F.; Fernandez Rondon, Manuel; Viante Garrido, Enrique; Berdeguez, Mirta B.T.; Rodriguez Perez, Hilario

    1999-01-01

    The paper shows how a Quality Assurance System for the process of production of gamma shielding devices has been conceived, designed and implemented. Special emphasis is given to the necessity of utilizing tools of control statistic in order to guaranteed the quality in the serial production process of such devices used in the transport, storage and handling of radioactive materials.(author)

  19. Testing of FFTF fuel handling equipment

    International Nuclear Information System (INIS)

    Coleman, D.W.; Grazzini, E.D.; Hill, L.F.

    1977-07-01

    The Fast Flux Test Facility has several manual/computer controlled fuel handling machines which are exposed to severe environments during plant operation but still must operate reliably when called upon for reactor refueling. The test programs for two such machines--the Closed Loop Ex-Vessel Machine and the In-Vessel Handling Machine--are described. The discussion centers on those areas where design corrections or equipment repairs substantiated the benefits of a test program prior to plant operation

  20. Design and construction of vacuum control system on EAST

    International Nuclear Information System (INIS)

    Wang, L.; Zhang, Y.; Hu, Q.S.; Wang, X.M.; Zhang, X.D.; Hu, J.S.; Yang, Y.; Gu, X.M.

    2008-01-01

    The construction of experimental advanced superconducting tokamak (EAST) was finished at the end of 2006 in Hefei, China. Its vacuum system, an important subsystem, has been commissioned in February 2006. The design and construction of this vacuum control system are described in this paper. The requirements for remote automation, distributed control and centralized management, high reliability and expansibility have been taken into account in the design. There are three levels of control in vacuum control system. The bottom level control is performed on the local instruments manually; the medium level control is based on Siemens S7-400 PLC; the top level control is conducted on IPCs with communication through profi b us network. In addition remote handling and centralized monitoring could be realized by a remote control server. The control system could achieve pumping and fueling of the whole vacuum system. Besides that, it also includes the data acquisition of the pressure and temperature. The details are discussed on the monitoring of vacuum system states including cooling water, power and compressed air, etc., safeguards of plasma chamber and cryostat chamber and vacuum equipments, choosing of control modes corresponding to the plasma discharge and wall conditioning. At the end, the parts of EAST device protection system related to vacuum and gas injection system will also be introduced