WorldWideScience

Sample records for handle demand peaks

  1. 'Peak oil' or 'peak demand'?

    International Nuclear Information System (INIS)

    Chevallier, Bruno; Moncomble, Jean-Eudes; Sigonney, Pierre; Vially, Rolland; Bosseboeuf, Didier; Chateau, Bertrand

    2012-01-01

    This article reports a workshop which addressed several energy issues like the objectives and constraints of energy mix scenarios, the differences between the approaches in different countries, the cost of new technologies implemented for this purposes, how these technologies will be developed and marketed, which will be the environmental and societal acceptability of these technical choices. Different aspects and issues have been more precisely presented and discussed: the peak oil, development of shale gases and their cost (will non conventional hydrocarbons modify the peak oil and be socially accepted?), energy efficiency (its benefits, its reality in France and other countries, its position in front of the challenge of energy transition), and strategies in the transport sector (challenges for mobility, evolution towards a model of sustainable mobility)

  2. Reducing Electricity Demand Peaks by Scheduling Home Appliances Usage

    DEFF Research Database (Denmark)

    Rossello Busquet, Ana; Kardaras, Georgios; Iversen, Villy Bæk

    2011-01-01

    Nowadays there is a tendency to consume electricity during the same period of the day leading to demand peaks. Regular energy consumption habits lead to demand peaks at specific temporal intervals, because users consume power at the same time. In order to avoid demand peaks, users’ appliances...... should consume electricity in a more temporarily distributed way. A new methodology to schedule the usage of home appliances is proposed and analyzed in this paper. The main concept behind this approach is the aggregation of home appliances into priority classes and the definition of a maximum power...... consumption limit, which is not allowed to be exceeded during peak hours. The scenario simulated describes a modern household, where the electrical devices are classified in low and high priority groups. The high priority devices are always granted power in order to operate without temporal restrictions...

  3. Demand Side Management: An approach to peak load smoothing

    Science.gov (United States)

    Gupta, Prachi

    A preliminary national-level analysis was conducted to determine whether Demand Side Management (DSM) programs introduced by electric utilities since 1992 have made any progress towards their stated goal of reducing peak load demand. Estimates implied that DSM has a very small effect on peak load reduction and there is substantial regional and end-user variability. A limited scholarly literature on DSM also provides evidence in support of a positive effect of demand response programs. Yet, none of these studies examine the question of how DSM affects peak load at the micro-level by influencing end-users' response to prices. After nearly three decades of experience with DSM, controversy remains over how effective these programs have been. This dissertation considers regional analyses that explore both demand-side solutions and supply-side interventions. On the demand side, models are estimated to provide in-depth evidence of end-user consumption patterns for each North American Electric Reliability Corporation (NERC) region, helping to identify sectors in regions that have made a substantial contribution to peak load reduction. The empirical evidence supports the initial hypothesis that there is substantial regional and end-user variability of reductions in peak demand. These results are quite robust in rapidly-urbanizing regions, where air conditioning and lighting load is substantially higher, and regions where the summer peak is more pronounced than the winter peak. It is also evident from the regional experiences that active government involvement, as shaped by state regulations in the last few years, has been successful in promoting DSM programs, and perhaps for the same reason we witness an uptick in peak load reductions in the years 2008 and 2009. On the supply side, we estimate the effectiveness of DSM programs by analyzing the growth of capacity margin with the introduction of DSM programs. The results indicate that DSM has been successful in offsetting the

  4. Scheduling Non-Preemptible Jobs to Minimize Peak Demand

    Directory of Open Access Journals (Sweden)

    Sean Yaw

    2017-10-01

    Full Text Available This paper examines an important problem in smart grid energy scheduling; peaks in power demand are proportionally more expensive to generate and provision for. The issue is exacerbated in local microgrids that do not benefit from the aggregate smoothing experienced by large grids. Demand-side scheduling can reduce these peaks by taking advantage of the fact that there is often flexibility in job start times. We focus attention on the case where the jobs are non-preemptible, meaning once started, they run to completion. The associated optimization problem is called the peak demand minimization problem, and has been previously shown to be NP-hard. Our results include an optimal fixed-parameter tractable algorithm, a polynomial-time approximation algorithm, as well as an effective heuristic that can also be used in an online setting of the problem. Simulation results show that these methods can reduce peak demand by up to 50% versus on-demand scheduling for household power jobs.

  5. Problems of peak demands in the gas industry

    Energy Technology Data Exchange (ETDEWEB)

    Haeberlin, A

    1979-01-01

    After a brief explanation of the demands made on gas supply enterprises, a discussion of the possibilities of optimization for meeting the demand follows. There are in principle two possibilities for this: the interruption of deliveries which should be made legal in a contract and the use of peak supply plants, especially in the form of gas storages. The procedure is chosen according to the special situation of each gas supply enterprise.

  6. Climate change and peak demand for electricity: Evaluating policies for reducing peak demand under different climate change scenarios

    Science.gov (United States)

    Anthony, Abigail Walker

    This research focuses on the relative advantages and disadvantages of using price-based and quantity-based controls for electricity markets. It also presents a detailed analysis of one specific approach to quantity based controls: the SmartAC program implemented in Stockton, California. Finally, the research forecasts electricity demand under various climate scenarios, and estimates potential cost savings that could result from a direct quantity control program over the next 50 years in each scenario. The traditional approach to dealing with the problem of peak demand for electricity is to invest in a large stock of excess capital that is rarely used, thereby greatly increasing production costs. Because this approach has proved so expensive, there has been a focus on identifying alternative approaches for dealing with peak demand problems. This research focuses on two approaches: price based approaches, such as real time pricing, and quantity based approaches, whereby the utility directly controls at least some elements of electricity used by consumers. This research suggests that well-designed policies for reducing peak demand might include both price and quantity controls. In theory, sufficiently high peak prices occurring during periods of peak demand and/or low supply can cause the quantity of electricity demanded to decline until demand is in balance with system capacity, potentially reducing the total amount of generation capacity needed to meet demand and helping meet electricity demand at the lowest cost. However, consumers need to be well informed about real-time prices for the pricing strategy to work as well as theory suggests. While this might be an appropriate assumption for large industrial and commercial users who have potentially large economic incentives, there is not yet enough research on whether households will fully understand and respond to real-time prices. Thus, while real-time pricing can be an effective tool for addressing the peak load

  7. Reducing electricity demand peaks by scheduling home appliances usage

    Energy Technology Data Exchange (ETDEWEB)

    Rossello-Busquet, A.; Kardaras, G.; Baek Iversen, V.; Soler, J.; Dittmann, L.

    2011-05-15

    Nowadays there is a tendency to consume electricity during the same period of the day leading to demand peaks. Regular energy consumption habits lead to demand peaks at specific temporal intervals, because users consume power at the same time. In order to avoid demand peaks, users' appliances should consume electricity in a more temporarily distributed way. A new methodology to schedule the usage of home appliances is proposed and analyzed in this paper. The main concept behind this approach is the aggregation of home appliances into priority classes and the definition of a maximum power consumption limit, which is not allowed to be exceeded during peak hours. The scenario simulated describes a modern household, where the electrical devices are classified in low and high priority groups. The high priority devices are always granted power in order to operate without temporal restrictions. On the contrary, the low priority devices have to pause their operation, when the algorithm dictates it, and resume it in the future. This can become beneficial for both energy companies and users. The electricity suppliers companies will be capable of regulating power generation during demand peaks periods. Moreover, users can be granted lower electricity bill rates for accepting delaying the operation of some of their appliances. In order to analyze this scenario, teletraffic engineering theory, which is used in evaluating the performance of telecommunication networks, is used. A reversible fair scheduling (RFS) algorithm, which was originally developed for telecommunication networks, is applied. The purpose is to analyze how a power consumption limit and priorities for home appliances will affect the demand peak and the users' everyday life. Verification of the effectiveness of the RFS algorithm is done by means of simulation and by using real data for power consumption and operation hours. The defined maximum power limit of 750 and 1000 Watt was not exceeded during

  8. BENEFITS OF WILDERNESS EXPANSION WITH EXCESS DEMAND FOR INDIAN PEAKS

    OpenAIRE

    Walsh, Richard G.; Gilliam, Lynde O.

    1982-01-01

    The contingent valuation approach was applied to the problem of estimating the recreation benefits from alleviating congestion at Indian Peaks wilderness area, Colorado. A random sample of 126 individuals were interviewed while hiking and backpacking at the study site in 1979. The results provide an empirical test and confirmation of the Cesario and Freeman proposals that under conditions of excess recreational demand for existing sites, enhanced opportunities to substitute newly designated s...

  9. Households' hourly electricity consumption and peak demand in Denmark

    DEFF Research Database (Denmark)

    Møller Andersen, Frits; Baldini, Mattia; Hansen, Lars Gårn

    2017-01-01

    consumption, we analyse the contribution of appliances and new services, such as individual heat pumps and electric vehicles, to peak consumption and the need for demand response incentives to reduce the peak.Initially, the paper presents a new model that represents the hourly electricity consumption profile...... of households in Denmark. The model considers hourly consumption profiles for different household appliances and their contribution to annual household electricity consumption. When applying the model to an official scenario for annual electricity consumption, assuming non-flexible consumption due...... to a considerable introduction of electric vehicles and individual heat pumps, household consumption is expected to increase considerably, especially peak hour consumption is expected to increase.Next the paper presents results from a new experiment where household customers are given economic and/or environmental...

  10. Energy Saving by Chopping off Peak Demand Using Day Light

    Directory of Open Access Journals (Sweden)

    Ashok Kumar Maitra

    2011-08-01

    Full Text Available An artificial intelligent technique has been implemented in this research using real time datas to calculate how much energy can be chopped from peak load demand. The results are based on real time data that are taken from power delivering centers. These datas do reflect the present condition of power and a solution to those critical conditions during the peak period. These are done in such a way such that helps in judicious scheduling of load. The time based load scheduling has been done so as to understand the basic criteria for solving power crisis during morning peak and early evening peak. The sunray availability and percentage of load that will use day light saving (DLS technique has been taken into account in this work. The results shows that about 0.5% to 1% of load can be shedded off from the peak load period which otherwise is reduction of power. Thus it otherwise also means that an equivalent amount of energy is saved which amounts to a large saving of national money. This result is obtained on monthly and even daily basis. Thus this paper justifies DLS gives a new renewable technique to save energy.

  11. Residential demand response reduces air pollutant emissions on peak electricity demand days in New York City

    International Nuclear Information System (INIS)

    Gilbraith, Nathaniel; Powers, Susan E.

    2013-01-01

    Many urban areas in the United States have experienced difficulty meeting the National Ambient Air Quality Standards (NAAQS), partially due to pollution from electricity generating units. We evaluated the potential for residential demand response to reduce pollutant emissions on days with above average pollutant emissions and a high potential for poor air quality. The study focused on New York City (NYC) due to non-attainment with NAAQS standards, large exposed populations, and the existing goal of reducing pollutant emissions. The baseline demand response scenario simulated a 1.8% average reduction in NYC peak demand on 49 days throughout the summer. Nitrogen oxide and particulate matter less than 2.5 μm in diameter emission reductions were predicted to occur (−70, −1.1 metric tons (MT) annually), although, these were not likely to be sufficient for NYC to meet the NAAQS. Air pollution mediated damages were predicted to decrease by $100,000–$300,000 annually. A sensitivity analysis predicted that substantially larger pollutant emission reductions would occur if electricity demand was shifted from daytime hours to nighttime hours, or the total consumption decreased. Policies which incentivize shifting electricity consumption away from periods of high human and environmental impacts should be implemented, including policies directed toward residential consumers. - Highlights: • The impact of residential demand response on air emissions was modeled. • Residential demand response will decrease pollutant emissions in NYC. • Emissions reductions occur during periods with high potential for poor air quality. • Shifting demand to nighttime hours was more beneficial than to off-peak daytime hours

  12. Evidence is growing on demand side of an oil peak

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-15

    After years of continued growth, the number of miles driven by Americans started falling in December 2007. Not only are the number of miles driven falling, but as cars become more fuel efficient, they go further on fewer gallons - further reducing demand for gasoline. This trend is expected to accelerate. Drivers include, along with higher-efficiency cars, mass transit, reversal in urban sprawl, biofuels, and plug-in hybrid vehicles.

  13. China expands refining sector to handle booming oil demand

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    China's refining sector is in the midst of a major expansion and reorganization in response to booming domestic demand for petroleum products. Plans call for hiking crude processing capacity to 3.9 million b/d in 1995 from the current 3.085 million b/d. Much of that 26% increase will come where the products demand growth is the strongest: China's coastal provinces, notably those in the southeast. Despite the demand surge, China's refineries operated at only 74% of capacity in 1991, and projections for 1992 weren't much better. Domestic crude supply is limited because of Beijing's insistence on maintaining crude export levels, a major source of hard currency foreign exchange. The paper discusses the superheated demand; exports and imports; the refining infrastructure; the Shenzhen refinery; Hong Kong demand; southeast coast demand; 1993 plans; and foreign investment

  14. A Framework for Understanding and Generating Integrated Solutions for Residential Peak Energy Demand

    Science.gov (United States)

    Buys, Laurie; Vine, Desley; Ledwich, Gerard; Bell, John; Mengersen, Kerrie; Morris, Peter; Lewis, Jim

    2015-01-01

    Supplying peak energy demand in a cost effective, reliable manner is a critical focus for utilities internationally. Successfully addressing peak energy concerns requires understanding of all the factors that affect electricity demand especially at peak times. This paper is based on past attempts of proposing models designed to aid our understanding of the influences on residential peak energy demand in a systematic and comprehensive way. Our model has been developed through a group model building process as a systems framework of the problem situation to model the complexity within and between systems and indicate how changes in one element might flow on to others. It is comprised of themes (social, technical and change management options) networked together in a way that captures their influence and association with each other and also their influence, association and impact on appliance usage and residential peak energy demand. The real value of the model is in creating awareness, understanding and insight into the complexity of residential peak energy demand and in working with this complexity to identify and integrate the social, technical and change management option themes and their impact on appliance usage and residential energy demand at peak times. PMID:25807384

  15. Price, environment and security: Exploring multi-modal motivation in voluntary residential peak demand response

    International Nuclear Information System (INIS)

    Gyamfi, Samuel; Krumdieck, Susan

    2011-01-01

    Peak demand on electricity grids is a growing problem that increases costs and risks to supply security. Residential sector loads often contribute significantly to seasonal and daily peak demand. Demand response projects aim to manage peak demand by applying price signals and automated load shedding technologies. This research investigates voluntary load shedding in response to information about the security of supply, the emission profile and the cost of meeting critical peak demand in the customers' network. Customer willingness to change behaviour in response to this information was explored through mail-back survey. The diversified demand modelling method was used along with energy audit data to estimate the potential peak load reduction resulting from the voluntary demand response. A case study was conducted in a suburb of Christchurch, New Zealand, where electricity is the main source for water and space heating. On this network, all water heating cylinders have ripple-control technology and about 50% of the households subscribe to differential day/night pricing plan. The survey results show that the sensitivity to supply security is on par with price, with the emission sensitivity being slightly weaker. The modelling results show potential 10% reduction in critical peak load for aggregate voluntary demand response. - Highlights: → Multiple-factor behaviour intervention is necessarily for effective residential demand response. → Security signals can achieve result comparable to price. → The modelling results show potential 10% reduction in critical peak load for aggregate voluntary demand response. → New Zealand's energy policy should include innovation and development of VDR programmes and technologies.

  16. Impact of peak electricity demand in distribution grids: a stress test

    NARCIS (Netherlands)

    Hoogsteen, Gerwin; Molderink, Albert; Hurink, Johann L.; Smit, Gerardus Johannes Maria; Schuring, Friso; Kootstra, Ben

    2015-01-01

    The number of (hybrid) electric vehicles is growing, leading to a higher demand for electricity in distribution grids. To investigate the effects of the expected peak demand on distribution grids, a stress test with 15 electric vehicles in a single street is conducted and described in this paper.

  17. Assessment of end-use electricity consumption and peak demand by Townsville's housing stock

    International Nuclear Information System (INIS)

    Ren, Zhengen; Paevere, Phillip; Grozev, George; Egan, Stephen; Anticev, Julia

    2013-01-01

    We have developed a comprehensive model to estimate annual end-use electricity consumption and peak demand of housing stock, considering occupants' use of air conditioning systems and major appliances. The model was applied to analyse private dwellings in Townsville, Australia's largest tropical city. For the financial year (FY) 2010–11 the predicted results agreed with the actual electricity consumption with an error less than 10% for cooling thermostat settings at the standard setting temperature of 26.5 °C and at 1.0 °C higher than the standard setting. The greatest difference in monthly electricity consumption in the summer season between the model and the actual data decreased from 21% to 2% when the thermostat setting was changed from 26.5 °C to 27.5 °C. Our findings also showed that installation of solar panels in Townville houses could reduce electricity demand from the grid and would have a minor impact on the yearly peak demand. A key new feature of the model is that it can be used to predict probability distribution of energy demand considering (a) that appliances may be used randomly and (b) the way people use thermostats. The peak demand for the FY estimated from the probability distribution tracked the actual peak demand at 97% confidence level. - Highlights: • We developed a model to estimate housing stock energy consumption and peak demand. • Appliances used randomly and thermostat settings for space cooling were considered. • On-site installation of solar panels was also considered. • Its' results agree well with the actual electricity consumption and peak demand. • It shows the model could provide the probability distribution of electricity demand

  18. Reduction of peak energy demand based on smart appliances energy consumption adjustment

    Science.gov (United States)

    Powroźnik, P.; Szulim, R.

    2017-08-01

    In the paper the concept of elastic model of energy management for smart grid and micro smart grid is presented. For the proposed model a method for reducing peak demand in micro smart grid has been defined. The idea of peak demand reduction in elastic model of energy management is to introduce a balance between demand and supply of current power for the given Micro Smart Grid in the given moment. The results of the simulations studies were presented. They were carried out on real household data available on UCI Machine Learning Repository. The results may have practical application in the smart grid networks, where there is a need for smart appliances energy consumption adjustment. The article presents a proposal to implement the elastic model of energy management as the cloud computing solution. This approach of peak demand reduction might have application particularly in a large smart grid.

  19. Extreme daily increases in peak electricity demand: Tail-quantile estimation

    International Nuclear Information System (INIS)

    Sigauke, Caston; Verster, Andréhette; Chikobvu, Delson

    2013-01-01

    A Generalized Pareto Distribution (GPD) is used to model extreme daily increases in peak electricity demand. The model is fitted to years 2000–2011 recorded data for South Africa to make a comparative analysis with the Generalized Pareto-type (GP-type) distribution. Peak electricity demand is influenced by the tails of probability distributions as well as by means or averages. At times there is a need to depart from the average thinking and exploit information provided by the extremes (tails). Empirical results show that both the GP-type and the GPD are a good fit to the data. One of the main advantages of the GP-type is the estimation of only one parameter. Modelling of extreme daily increases in peak electricity demand helps in quantifying the amount of electricity which can be shifted from the grid to off peak periods. One of the policy implications derived from this study is the need for day-time use of electricity billing system similar to the one used in the cellular telephone/and fixed line-billing technology. This will result in the shifting of electricity demand on the grid to off peak time slots as users try to avoid high peak hour charges. - Highlights: ► Policy makers should design demand response strategies to save electricity. ► Peak electricity demand is influenced by tails of probability distributions. ► Both the GSP and the GPD are a good fit to the data. ► Accurate assessment of level and frequency of extreme load forecasts is important.

  20. The Risk of Residential Peak Electricity Demand: A Comparison of Five European Countries

    Directory of Open Access Journals (Sweden)

    Jacopo Torriti

    2017-03-01

    Full Text Available The creation of a Europe-wide electricity market combined with the increased intermittency of supply from renewable sources calls for an investigation into the risk of aggregate peak demand. This paper makes use of a risk model to assess differences in time-use data from residential end-users in five different European electricity markets. Drawing on the Multinational Time-Use Survey database, it assesses risk in relation to the probability of electrical appliance use within households for five European countries. Findings highlight in which countries and for which activities the risk of aggregate peak demand is higher and link smart home solutions (automated load control, dynamic pricing and smart appliances to different levels of peak demand risk.

  1. Regulating electricity demand peaks for home appliances using reversible fair scheduling

    DEFF Research Database (Denmark)

    Kardaras, Georgios; Rossello Busquet, Ana; Iversen, Villy Bæk

    2010-01-01

    This paper describes a novel methodology for regulating electricity demand peaks for home appliances. To achieve this objective, we will make use of the reversible fair scheduling algorithm originally developed for telecommunication networks. The main concept behind this approach is the aggregati...

  2. An Auto Tuning Substation Peak Shaving Controller for Congestion Management Using Flexible Demand

    DEFF Research Database (Denmark)

    Sossan, Fabrizio; Marinelli, Mattia

    2013-01-01

    A closed loop substation peak shaving/congestion management controller for radial distribution networks is presented. The controller it uses an individual control signal in order to shift the consumption of a population of demand side resources, DSRs. The controller auto tunes its parameters on...

  3. Forecasting monthly peak demand of electricity in India—A critique

    International Nuclear Information System (INIS)

    Rallapalli, Srinivasa Rao; Ghosh, Sajal

    2012-01-01

    The nature of electricity differs from that of other commodities since electricity is a non-storable good and there have been significant seasonal and diurnal variations of demand. Under such condition, precise forecasting of demand for electricity should be an integral part of the planning process as this enables the policy makers to provide directions on cost-effective investment and on scheduling the operation of the existing and new power plants so that the supply of electricity can be made adequate enough to meet the future demand and its variations. Official load forecasting in India done by Central Electricity Authority (CEA) is often criticized for being overestimated due to inferior techniques used for forecasting. This paper tries to evaluate monthly peak demand forecasting performance predicted by CEA using trend method and compare it with those predicted by Multiplicative Seasonal Autoregressive Integrated Moving Average (MSARIMA) model. It has been found that MSARIMA model outperforms CEA forecasts both in-sample static and out-of-sample dynamic forecast horizons in all five regional grids in India. For better load management and grid discipline, this study suggests employing sophisticated techniques like MSARIMA for peak load forecasting in India. - Highlights: ► This paper evaluates monthly peak demand forecasting performance by CEA. ► Compares CEA forecasts it with those predicted by MSARIMA model. ► MSARIMA model outperforms CEA forecasts in all five regional grids in India. ► Opportunity exists to improve the performance of CEA forecasts.

  4. Peak load demand forecasting using two-level discrete wavelet decomposition and neural network algorithm

    Science.gov (United States)

    Bunnoon, Pituk; Chalermyanont, Kusumal; Limsakul, Chusak

    2010-02-01

    This paper proposed the discrete transform and neural network algorithms to obtain the monthly peak load demand in mid term load forecasting. The mother wavelet daubechies2 (db2) is employed to decomposed, high pass filter and low pass filter signals from the original signal before using feed forward back propagation neural network to determine the forecasting results. The historical data records in 1997-2007 of Electricity Generating Authority of Thailand (EGAT) is used as reference. In this study, historical information of peak load demand(MW), mean temperature(Tmean), consumer price index (CPI), and industrial index (economic:IDI) are used as feature inputs of the network. The experimental results show that the Mean Absolute Percentage Error (MAPE) is approximately 4.32%. This forecasting results can be used for fuel planning and unit commitment of the power system in the future.

  5. Energy Management in Smart Cities Based on Internet of Things: Peak Demand Reduction and Energy Savings.

    Science.gov (United States)

    Mahapatra, Chinmaya; Moharana, Akshaya Kumar; Leung, Victor C M

    2017-12-05

    Around the globe, innovation with integrating information and communication technologies (ICT) with physical infrastructure is a top priority for governments in pursuing smart, green living to improve energy efficiency, protect the environment, improve the quality of life, and bolster economy competitiveness. Cities today faces multifarious challenges, among which energy efficiency of homes and residential dwellings is a key requirement. Achieving it successfully with the help of intelligent sensors and contextual systems would help build smart cities of the future. In a Smart home environment Home Energy Management plays a critical role in finding a suitable and reliable solution to curtail the peak demand and achieve energy conservation. In this paper, a new method named as Home Energy Management as a Service (HEMaaS) is proposed which is based on neural network based Q -learning algorithm. Although several attempts have been made in the past to address similar problems, the models developed do not cater to maximize the user convenience and robustness of the system. In this paper, authors have proposed an advanced Neural Fitted Q -learning method which is self-learning and adaptive. The proposed method provides an agile, flexible and energy efficient decision making system for home energy management. A typical Canadian residential dwelling model has been used in this paper to test the proposed method. Based on analysis, it was found that the proposed method offers a fast and viable solution to reduce the demand and conserve energy during peak period. It also helps reducing the carbon footprint of residential dwellings. Once adopted, city blocks with significant residential dwellings can significantly reduce the total energy consumption by reducing or shifting their energy demand during peak period. This would definitely help local power distribution companies to optimize their resources and keep the tariff low due to curtailment of peak demand.

  6. Energy Management in Smart Cities Based on Internet of Things: Peak Demand Reduction and Energy Savings

    Directory of Open Access Journals (Sweden)

    Chinmaya Mahapatra

    2017-12-01

    Full Text Available Around the globe, innovation with integrating information and communication technologies (ICT with physical infrastructure is a top priority for governments in pursuing smart, green living to improve energy efficiency, protect the environment, improve the quality of life, and bolster economy competitiveness. Cities today faces multifarious challenges, among which energy efficiency of homes and residential dwellings is a key requirement. Achieving it successfully with the help of intelligent sensors and contextual systems would help build smart cities of the future. In a Smart home environment Home Energy Management plays a critical role in finding a suitable and reliable solution to curtail the peak demand and achieve energy conservation. In this paper, a new method named as Home Energy Management as a Service (HEMaaS is proposed which is based on neural network based Q-learning algorithm. Although several attempts have been made in the past to address similar problems, the models developed do not cater to maximize the user convenience and robustness of the system. In this paper, authors have proposed an advanced Neural Fitted Q-learning method which is self-learning and adaptive. The proposed method provides an agile, flexible and energy efficient decision making system for home energy management. A typical Canadian residential dwelling model has been used in this paper to test the proposed method. Based on analysis, it was found that the proposed method offers a fast and viable solution to reduce the demand and conserve energy during peak period. It also helps reducing the carbon footprint of residential dwellings. Once adopted, city blocks with significant residential dwellings can significantly reduce the total energy consumption by reducing or shifting their energy demand during peak period. This would definitely help local power distribution companies to optimize their resources and keep the tariff low due to curtailment of peak demand.

  7. Impact of roof integrated PV orientation on the residential electricity peak demand

    International Nuclear Information System (INIS)

    Sadineni, Suresh B.; Atallah, Fady; Boehm, Robert F.

    2012-01-01

    Highlights: ► A study to demonstrate peak load reductions at the substation. ► A new residential energy efficient community named Villa Trieste is being developed. ► The peak demand from the homes has decreased by 38% through energy efficiency. ► Orientation of roof integrated PV has less influence on the summer peak demand. ► Increasing thermostat temperature during peak by 1 °C can significantly reduce peaks. -- Abstract: Peak electricity demand has been an issue in the Desert Southwest region of the US, due to extreme summer temperatures. To address this issue, a consortium was formed between the University of Nevada, Las Vegas, Pulte Homes, and NV Energy. An energy efficient residential community was developed by the team in Las Vegas with approximately 200 homes to study substation-level peak reduction strategies. A summer peak reduction of more than 65%, between 1:00 PM and 7:00 PM, compared to code standard housing developments is the targeted goal of the project. Approximately 50 homes are already built and some are occupied. The energy performances of the homes have been monitored and are presented in this paper. Several peak electric load reduction strategies such as energy efficiency in buildings, roof integrated photovoltaics (PV) and direct load control have been applied. Though all the homes in the developed community are installed with 1.8 kW p PV systems, the orientation of the PV system depends on the building orientation. Focus of this paper is to find the impact of PV orientation on the peak load from a building. In addition, different time-of-use (TOU) energy pricing options are offered by the local electrical utility company. Hence it is important to find an optimal pricing option for each building. A computer model has been developed for one of the homes in the new development using building energy simulation code, ENERGY-10. Calculations on the PV orientations have shown that a south and 220° (i.e. 40° west of due south

  8. Modeling of GE Appliances in GridLAB-D: Peak Demand Reduction

    Energy Technology Data Exchange (ETDEWEB)

    Fuller, Jason C.; Vyakaranam, Bharat GNVSR; Prakash Kumar, Nirupama; Leistritz, Sean M.; Parker, Graham B.

    2012-04-29

    The widespread adoption of demand response enabled appliances and thermostats can result in significant reduction to peak electrical demand and provide potential grid stabilization benefits. GE has developed a line of appliances that will have the capability of offering several levels of demand reduction actions based on information from the utility grid, often in the form of price. However due to a number of factors, including the number of demand response enabled appliances available at any given time, the reduction of diversity factor due to the synchronizing control signal, and the percentage of consumers who may override the utility signal, it can be difficult to predict the aggregate response of a large number of residences. The effects of these behaviors can be modeled and simulated in open-source software, GridLAB-D, including evaluation of appliance controls, improvement to current algorithms, and development of aggregate control methodologies. This report is the first in a series of three reports describing the potential of GE's demand response enabled appliances to provide benefits to the utility grid. The first report will describe the modeling methodology used to represent the GE appliances in the GridLAB-D simulation environment and the estimated potential for peak demand reduction at various deployment levels. The second and third reports will explore the potential of aggregated group actions to positively impact grid stability, including frequency and voltage regulation and spinning reserves, and the impacts on distribution feeder voltage regulation, including mitigation of fluctuations caused by high penetration of photovoltaic distributed generation and the effects on volt-var control schemes.

  9. Interdependent demands, regulatory constraint, and peak-load pricing. [Assessment of Bailey's model

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, D T; Macgregor-Reid, G J

    1977-06-01

    A model of a regulated firm which includes an analysis of peak-load pricing has been formulated by E. E. Bailey in which three alternative modes of regulation on a profit-maximizing firm are considered. The main conclusion reached is that under a regulation limiting the rate of return on capital investment, price reductions are received solely by peak-users and that when regulation limiting the profit per unit of output or the return on costs is imposed, there are price reductions for all users. Bailey has expressly assumed that the demands in different periods are interdependent but has somehow failed to derive the correct price and welfare implications of this empirically highly relevant assumption. Her conclusions would have been perfectly correct for marginal revenues but are quite incorrect for prices, even if her assumption that price exceeds marginal revenues in every period holds. This present paper derives fully and rigorously the implications of regulation for prices, outputs, capacity, and social welfare for a profit-maximizing firm with interdependent demands. In section II, Bailey's model is reproduced and the optimal conditions are given. In section III, it is demonstrated that under the conditions of interdependent demands assumed by Bailey herself, her often-quoted conclusion concerning the effects of the return-on-investment regulation on the off-peak price is invalid. In section IV, the effects of the return-on-investment regulation on the optimal prices, outputs, capacity, and social welfare both for the case in which the demands in different periods are substitutes and for the case in which they are complements are examined. In section V, the pricing and welfare implications of the return-on-investment regulation are compared with the two other modes of regulation considered by Bailey. Section VI is a summary of all sections. (MCW)

  10. Impacts of Climate Change on Energy Consumption and Peak Demand in Buildings: A Detailed Regional Approach

    Energy Technology Data Exchange (ETDEWEB)

    Dirks, James A.; Gorrissen, Willy J.; Hathaway, John E.; Skorski, Daniel C.; Scott, Michael J.; Pulsipher, Trenton C.; Huang, Maoyi; Liu, Ying; Rice, Jennie S.

    2015-01-01

    This paper presents the results of numerous commercial and residential building simulations, with the purpose of examining the impact of climate change on peak and annual building energy consumption over the portion of the Eastern Interconnection (EIC) located in the United States. The climate change scenario considered (IPCC A2 scenario as downscaled from the CASCaDE data set) has changes in mean climate characteristics as well as changes in the frequency and duration of intense weather events. This investigation examines building energy demand for three annual periods representative of climate trends in the CASCaDE data set at the beginning, middle, and end of the century--2004, 2052, and 2089. Simulations were performed using the Building ENergy Demand (BEND) model which is a detailed simulation platform built around EnergyPlus. BEND was developed in collaboration with the Platform for Regional Integrated Modeling and Analysis (PRIMA), a modeling framework designed to simulate the complex interactions among climate, energy, water, and land at decision-relevant spatial scales. Over 26,000 building configurations of different types, sizes, vintages, and, characteristics which represent the population of buildings within the EIC, are modeled across the 3 EIC time zones using the future climate from 100 locations within the target region, resulting in nearly 180,000 spatially relevant simulated demand profiles for each of the 3 years. In this study, the building stock characteristics are held constant based on the 2005 building stock in order to isolate and present results that highlight the impact of the climate signal on commercial and residential energy demand. Results of this analysis compare well with other analyses at their finest level of specificity. This approach, however, provides a heretofore unprecedented level of specificity across multiple spectrums including spatial, temporal, and building characteristics. This capability enables the ability to

  11. Opportunities for peak shaving the energy demand of ship-to-shore quay cranes at container terminals

    NARCIS (Netherlands)

    H. Geerlings; Robert Heij; dr. J.H.R. van Duin

    2018-01-01

    This paper presents the results of both a qualitative and a quantitative study on the possibilities for peak shaving the energy demand of ship-to-shore (STS) cranes at container terminals. The objective is to present an energy consumption model that visualizes the energy demand of STS cranes and to

  12. Opportunities for peak shaving the energy demand of ship-to-shore quay cranes at container terminals

    NARCIS (Netherlands)

    Geerlings, Harry; van Duin, Ron

    2018-01-01

    This paper presents the results of both a qualitative and a quantitative study on
    the possibilities for peak shaving the energy demand of ship-to-shore (STS) cranes at container terminals. The objective is to present an energy consumption model that visualizes the energy demand of STS cranes and

  13. Higher balance task demands are associated with an increase in individual alpha peak frequency

    Directory of Open Access Journals (Sweden)

    Thorben eHülsdünker

    2016-01-01

    Full Text Available Balance control is fundamental for most daily motor activities, and its impairment is associated with an increased risk of falling. Growing evidence suggests the human cortex is essentially contributing to the control of standing balance. However, the exact mechanisms remain unclear and need further investigation. In a previous study we introduced a new protocol to identify electrocortical activity associated with performance of different continuous balance tasks with the eyes opened. The aim of this study was to extend our previous results by investigating the individual alpha peak frequency (iAPF, a neurophysiological marker of thalamo-cortical information transmission, which remained unconsidered so far in balance research. Thirty-seven subjects completed nine balance tasks varying in surface stability and base of support. Electroencephalography (EEG was recorded from 32 scalp locations throughout balancing with the eyes closed to ensure reliable identification of the iAPF. Balance performance was quantified as the sum of anterior-posterior and medio-lateral movements of the supporting platform. The iAPF, as well as power in the theta, lower alpha and upper alpha frequency bands were determined for each balance task after applying an ICA-based artifact rejection procedure. Higher demands on balance control were associated with a global increase in iAPF and a decrease in lower alpha power. These results may indicate increased thalamo-cortical information transfer and general cortical activation, respectively. In addition, a significant increase in upper alpha activity was observed in the fronto-central region whereas it decreased in the centro-parietal region. Furthermore, midline theta increased with higher task demands probably indicating activation of error detection/processing mechanisms. IAPF as well as theta and alpha power were correlated with platform movements. The results provide new insights into spectral and spatial characteristics

  14. Price responsive load programs: U.S. experience in creating markets for peak demand reductions

    International Nuclear Information System (INIS)

    Goldberg, Miriam L.; Michelman, Thomas; Rosenberg, Mitchell

    2003-01-01

    Demand response programs use a variety of pricing mechanisms to induce end-use customers to reduce demand at specified periods. U.S. distribution utilities, regional market operators, and their regulators have implemented demand response programs with the objectives of improving electric system reliability, avoiding price spikes, and relieving local transmission congestion. This paper reviews the design and performance of market-linked demand response programs operated in 2001 and 2002, focusing on the relationship between program design and customer participation and the development of accurate and feasible methods to measure demand response at the facility level

  15. Effectiveness of measures and implementation strategies in reducing physical work demands due to manual handling at work

    NARCIS (Netherlands)

    van der Molen, Henk F.; Sluiter, Judith K.; Hulshof, Carel T. J.; Vink, Peter; Frings-Dresen, Monique H. W.

    2005-01-01

    This review aimed at producing insight into the effectiveness of interventions to reduce the physical work demands associated with manual (materials) handling in the work situation and musculoskeletal symptoms in the longer term. A systematic electronic literature search between 1990 and February

  16. Peak electricity demand and social practice theories: Reframing the role of change agents in the energy sector

    International Nuclear Information System (INIS)

    Strengers, Yolande

    2012-01-01

    Demand managers currently draw on a limited range of psychology and economic theories in order to shift and shed peak electricity demand. These theories place individual consumers and their attitudes, behaviours and choices at the centre of the problem. This paper reframes the issue of peak electricity demand using theories of social practices, contending that the ‘problem’ is one of transforming, technologically-mediated social practices. It reflects on how this body of theory repositions and refocuses the roles and practices of professions charged with the responsibility and agency for affecting and managing energy demand. The paper identifies three areas where demand managers could refocus their attention: (i) enabling co-management relationships with consumers; (ii) working beyond their siloed roles with a broader range of human and non-human actors; and (iii) promoting new practice ‘needs’ and expectations. It concludes by critically reflecting on the limited agency attributed to ‘change agents’ such as demand managers in dominant understandings of change. Instead, the paper proposes the need to identify and establish a new group of change agents who are actively but often unwittingly involved in reconfiguring the elements of problematic peaky practices. - Highlights: ► I reframe peak electricity demand as a problem of changing social practices. ► Micro-grids, and dynamic pricing reorient household routines and enable co-management. ► Infrastructures inside and outside the home configure peaky practices. ► Demand managers are encouraged to promote and challenge consumer ‘needs’. ► I identify a new group of change agents implicated in peaky practices.

  17. High Electricity Demand in the Northeast U.S.: PJM Reliability Network and Peaking Unit Impacts on Air Quality.

    Science.gov (United States)

    Farkas, Caroline M; Moeller, Michael D; Felder, Frank A; Henderson, Barron H; Carlton, Annmarie G

    2016-08-02

    On high electricity demand days, when air quality is often poor, regional transmission organizations (RTOs), such as PJM Interconnection, ensure reliability of the grid by employing peak-use electric generating units (EGUs). These "peaking units" are exempt from some federal and state air quality rules. We identify RTO assignment and peaking unit classification for EGUs in the Eastern U.S. and estimate air quality for four emission scenarios with the Community Multiscale Air Quality (CMAQ) model during the July 2006 heat wave. Further, we population-weight ambient values as a surrogate for potential population exposure. Emissions from electricity reliability networks negatively impact air quality in their own region and in neighboring geographic areas. Monitored and controlled PJM peaking units are generally located in economically depressed areas and can contribute up to 87% of hourly maximum PM2.5 mass locally. Potential population exposure to peaking unit PM2.5 mass is highest in the model domain's most populated cities. Average daily temperature and national gross domestic product steer peaking unit heat input. Air quality planning that capitalizes on a priori knowledge of local electricity demand and economics may provide a more holistic approach to protect human health within the context of growing energy needs in a changing world.

  18. Customers' expectations of complaint handling by airline service: privilege status and reasonability of demands from a social learning perspective.

    Science.gov (United States)

    Chiou, Wen-Bin; Chang, Ming-Hsu; Yang, Chao-Chin

    2009-04-01

    In the airline industry, membership and cabin class are noticeable servicescape features of customers' privilege status. Customers may learn that higher privilege customers are more desired and endured by the airline. From the customers' point of view, those with higher privilege may expect their demands to be complied with when they complain. The present study employed hypothetical scenarios to investigate how the privilege status of passengers and reasonability of their demands influenced their expectations toward the compliance of airline personnel. Analysis showed that higher privilege customers were more likely to expect airline personnel to comply with their demands. Moreover, participants with medium or high levels of privilege status had greater expectations of compliance even when demands were unreasonable. In sum, customer expectations toward complaint handling reflected predictions based on social learning.

  19. Early Detection of Peak Demand Days of Chronic Respiratory Diseases Emergency Department Visits Using Artificial Neural Networks.

    Science.gov (United States)

    Khatri, Krishan L; Tamil, Lakshman S

    2018-01-01

    Chronic respiratory diseases, mainly asthma and chronic obstructive pulmonary disease (COPD), affect the lives of people by limiting their activities in various aspects. Overcrowding of hospital emergency departments (EDs) due to respiratory diseases in certain weather and environmental pollution conditions results in the degradation of quality of medical care, and even limits its availability. A useful tool for ED managers would be to forecast peak demand days so that they can take steps to improve the availability of medical care. In this paper, we developed an artificial neural network based classifier using multilayer perceptron with back propagation algorithm that predicts peak event (peak demand days) of patients with respiratory diseases, mainly asthma and COPD visiting EDs in Dallas County of Texas in the United States. The precision and recall for peak event class were 77.1% and 78.0%, respectively, and those for nonpeak events were 83.9% and 83.2%, respectively. The overall accuracy of the system is 81.0%.

  20. Global Energy Trends - 2016 report. Towards a Peak in Energy Demand and CO2 Emissions?

    International Nuclear Information System (INIS)

    2016-06-01

    Celebrating the 20. anniversary of this yearly publication, Enerdata has newly released its annual Global Energy Trends publication for 2016. The full report presents in-depth information on the energy markets as well as upcoming trends for all energies in the G20. With over 400 premium sources, Enerdata analysts highlight major developments in 2015 concerning global demand, supply and key indicators across the globe. The main trends outlined in the report are: - Economic slowdown: the lowest growth since 2002; - Almost no growth in energy consumption; - New decrease of energy intensity; - Stabilization of CO 2 -energy emissions; - INDC targets achievement requires a double breakthrough. The Global Energy Trends Analysis also provides additional graphs about trends by energy: - Coal: most consumed energy source in G20 countries; - Oil: fall in prices to around 40-50 US$/bbl; - Oil production: USA overtake Russia and catch up with Saudi Arabia; - Gas: Stabilisation of gas demand for the 2. consecutive year; - Electricity: Stagnation of electricity consumption; - Wind Power and Solar PV: Asia engine of development. Growth in energy consumption (%/year) for G20 countries: - Second consecutive year of decline: low growth and decrease in energy intensity; - India drives the energy consumption growth; - Near stagnation in China (after a first sharp slowdown in 2014); - Economic recession in Brazil and Russia; - USA: decrease primarily linked to the industrial sector (energy efficiency + less energy-intensive industry); - Rebound in Europe: economic growth + climate effect 2015/2014

  1. Peak oil demand: the role of fuel efficiency and alternative fuels in a global oil production decline.

    Science.gov (United States)

    Brandt, Adam R; Millard-Ball, Adam; Ganser, Matthew; Gorelick, Steven M

    2013-07-16

    Some argue that peak conventional oil production is imminent due to physical resource scarcity. We examine the alternative possibility of reduced oil use due to improved efficiency and oil substitution. Our model uses historical relationships to project future demand for (a) transport services, (b) all liquid fuels, and (c) substitution with alternative energy carriers, including electricity. Results show great increases in passenger and freight transport activity, but less reliance on oil. Demand for liquids inputs to refineries declines significantly after 2070. By 2100 transport energy demand rises >1000% in Asia, while flattening in North America (+23%) and Europe (-20%). Conventional oil demand declines after 2035, and cumulative oil production is 1900 Gbbl from 2010 to 2100 (close to the U.S. Geological Survey median estimate of remaining oil, which only includes projected discoveries through 2025). These results suggest that effort is better spent to determine and influence the trajectory of oil substitution and efficiency improvement rather than to focus on oil resource scarcity. The results also imply that policy makers should not rely on liquid fossil fuel scarcity to constrain damage from climate change. However, there is an unpredictable range of emissions impacts depending on which mix of substitutes for conventional oil gains dominance-oil sands, electricity, coal-to-liquids, or others.

  2. Handling Uncertain Gross Margin and Water Demand in Agricultural Water Resources Management using Robust Optimization

    Science.gov (United States)

    Chaerani, D.; Lesmana, E.; Tressiana, N.

    2018-03-01

    In this paper, an application of Robust Optimization in agricultural water resource management problem under gross margin and water demand uncertainty is presented. Water resource management is a series of activities that includes planning, developing, distributing and managing the use of water resource optimally. Water resource management for agriculture can be one of the efforts to optimize the benefits of agricultural output. The objective function of agricultural water resource management problem is to maximizing total benefits by water allocation to agricultural areas covered by the irrigation network in planning horizon. Due to gross margin and water demand uncertainty, we assume that the uncertain data lies within ellipsoidal uncertainty set. We employ robust counterpart methodology to get the robust optimal solution.

  3. Financial incentive approaches for reducing peak electricity demand, experience from pilot trials with a UK energy provider

    International Nuclear Information System (INIS)

    Bradley, Peter; Coke, Alexia; Leach, Matthew

    2016-01-01

    Whilst tariff-based approaches to load-shifting are common in the residential sector, incentive-based approaches are rare. This is so, even though providing customers incentives to shape their power consumption patterns has substantial potential. This paper presents findings from an exploratory UK pilot study that trials financial payments and detailed energy feedback to incentivise load-shifting of residential electricity consumption. An intervention study was implemented measuring actual energy use by individual households as well as conducting surveys and interviews. From the trials it was found that the approaches resulted in reductions in peak time energy use. Evidence from the study found that the incentives-based approaches were able to overcome some of the barriers to response experienced in Time-of-Use studies, though less good on others. Interestingly, the height of the barriers varied by the electricity-using practice and the incentivising approach applied. The height of the barriers also varied by participant. The study concludes by identifying that broad participation in demand response is likely to require a suite of incentivising approaches that appeal to different people, a key policy finding of interest to international agencies, government, public and private sector entities. - Highlights: • Novel study of financial incentive approaches for shifting residential energy. • First academic paper comprehensively identifying barriers to time of use tariffs. • First study reporting barriers to financial incentive approaches for demand response. • Incentive study design can be applied by government and energy companies.

  4. A fuzzy-stochastic simulation-optimization model for planning electric power systems with considering peak-electricity demand: A case study of Qingdao, China

    International Nuclear Information System (INIS)

    Yu, L.; Li, Y.P.; Huang, G.H.

    2016-01-01

    In this study, a FSSOM (fuzzy-stochastic simulation-optimization model) is developed for planning EPS (electric power systems) with considering peak demand under uncertainty. FSSOM integrates techniques of SVR (support vector regression), Monte Carlo simulation, and FICMP (fractile interval chance-constrained mixed-integer programming). In FSSOM, uncertainties expressed as fuzzy boundary intervals and random variables can be effectively tackled. In addition, SVR coupled Monte Carlo technique is used for predicting the peak-electricity demand. The FSSOM is applied to planning EPS for the City of Qingdao, China. Solutions of electricity generation pattern to satisfy the city's peak demand under different probability levels and p-necessity levels have been generated. Results reveal that the city's electricity supply from renewable energies would be low (only occupying 8.3% of the total electricity generation). Compared with the energy model without considering peak demand, the FSSOM can better guarantee the city's power supply and thus reduce the system failure risk. The findings can help decision makers not only adjust the existing electricity generation/supply pattern but also coordinate the conflict interaction among system cost, energy supply security, pollutant mitigation, as well as constraint-violation risk. - Highlights: • FSSOM (Fuzzy-stochastic simulation-optimization model) is developed for planning EPS. • It can address uncertainties as fuzzy-boundary intervals and random variables. • FSSOM can satisfy peak-electricity demand and optimize power allocation. • Solutions under different probability levels and p-necessity levels are analyzed. • Results create tradeoff among system cost and peak-electricity demand violation risk.

  5. Chapter 10: Peak Demand and Time-Differentiated Energy Savings Cross-Cutting Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    Energy Technology Data Exchange (ETDEWEB)

    Kurnik, Charles W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Stern, Frank [Navigant, Boulder, CO (United States); Spencer, Justin [Navigant, Boulder, CO (United States)

    2017-10-03

    Savings from electric energy efficiency measures and programs are often expressed in terms of annual energy and presented as kilowatt-hours per year (kWh/year). However, for a full assessment of the value of these savings, it is usually necessary to consider the measure or program's impact on peak demand as well as time-differentiated energy savings. This cross-cutting protocol describes methods for estimating the peak demand and time-differentiated energy impacts of measures implemented through energy efficiency programs.

  6. Program Design Analysis using BEopt Building Energy Optimization Software: Defining a Technology Pathway Leading to New Homes with Zero Peak Cooling Demand; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, R.; Christensen, C.; Horowitz, S.

    2006-08-01

    An optimization method based on the evaluation of a broad range of different combinations of specific energy efficiency and renewable-energy options is used to determine the least-cost pathway to the development of new homes with zero peak cooling demand. The optimization approach conducts a sequential search of a large number of possible option combinations and uses the most cost-effective alternatives to generate a least-cost curve to achieve home-performance levels ranging from a Title 24-compliant home to a home that uses zero net source energy on an annual basis. By evaluating peak cooling load reductions on the least-cost curve, it is then possible to determine the most cost-effective combination of energy efficiency and renewable-energy options that both maximize annual energy savings and minimize peak-cooling demand.

  7. Modelling and short-term forecasting of daily peak power demand in Victoria using two-dimensional wavelet based SDP models

    International Nuclear Information System (INIS)

    Truong, Nguyen-Vu; Wang, Liuping; Wong, Peter K.C.

    2008-01-01

    Power demand forecasting is of vital importance to the management and planning of power system operations which include generation, transmission, distribution, as well as system's security analysis and economic pricing processes. This paper concerns the modeling and short-term forecast of daily peak power demand in the state of Victoria, Australia. In this study, a two-dimensional wavelet based state dependent parameter (SDP) modelling approach is used to produce a compact mathematical model for this complex nonlinear dynamic system. In this approach, a nonlinear system is expressed by a set of linear regressive input and output terms (state variables) multiplied by the respective state dependent parameters that carry the nonlinearities in the form of 2-D wavelet series expansions. This model is identified based on historical data, descriptively representing the relationship and interaction between various components which affect the peak power demand of a certain day. The identified model has been used to forecast daily peak power demand in the state of Victoria, Australia in the time period from the 9th of August 2007 to the 24th of August 2007. With a MAPE (mean absolute prediction error) of 1.9%, it has clearly implied the effectiveness of the identified model. (author)

  8. Using Hydrated Salt Phase Change Materials for Residential Air Conditioning Peak Demand Reduction and Energy Conservation in Coastal and Transitional Climates in the State of California

    Science.gov (United States)

    Lee, Kyoung Ok

    The recent rapid economic and population growth in the State of California have led to a significant increase in air conditioning use, especially in areas of the State with coastal and transitional climates. This fact makes that the electric peak demand be dominated by air conditioning use of residential buildings in the summer time. This extra peak demand caused by the use of air conditioning equipment lasts only a few days out of the year. As a result, unavoidable power outages have occurred when electric supply could not keep up with such electric demand. This thesis proposed a possible solution to this problem by using building thermal mass via phase change materials to reduce peak air conditioning demand loads. This proposed solution was tested via a new wall called Phase Change Frame Wall (PCFW). The PCFW is a typical residential frame wall in which Phase Change Materials (PCMs) were integrated to add thermal mass. The thermal performance of the PCFWs was first evaluated, experimentally, in two test houses, built for this purpose, located in Lawrence, KS and then via computer simulations of residential buildings located in coastal and transitional climates in California. In this thesis, a hydrated salt PCM was used, which was added in concentrations of 10% and 20% by weight of the interior sheathing of the walls. Based on the experimental results, under Lawrence, KS weather, the PCFWs at 10% and 20% of PCM concentrations reduced the peak heat transfer rates by 27.0% and 27.3%, on average, of all four walls, respectively. Simulated results using California climate data indicated that PCFWs would reduce peak heat transfer rates by 8% and 19% at 10% PCM concentration and 12.2% and 27% at 20% PCM concentration for the coastal and transitional climates, respectively. Furthermore, the PCFWs, at 10% PCM concentration, would reduce the space cooling load and the annual energy consumption by 10.4% and 7.2%, on average in both climates, respectively.

  9. Climate change is projected to have severe impacts on the frequency and intensity of peak electricity demand across the United States.

    Science.gov (United States)

    Auffhammer, Maximilian; Baylis, Patrick; Hausman, Catherine H

    2017-02-21

    It has been suggested that climate change impacts on the electric sector will account for the majority of global economic damages by the end of the current century and beyond [Rose S, et al. (2014) Understanding the Social Cost of Carbon: A Technical Assessment ]. The empirical literature has shown significant increases in climate-driven impacts on overall consumption, yet has not focused on the cost implications of the increased intensity and frequency of extreme events driving peak demand, which is the highest load observed in a period. We use comprehensive, high-frequency data at the level of load balancing authorities to parameterize the relationship between average or peak electricity demand and temperature for a major economy. Using statistical models, we analyze multiyear data from 166 load balancing authorities in the United States. We couple the estimated temperature response functions for total daily consumption and daily peak load with 18 downscaled global climate models (GCMs) to simulate climate change-driven impacts on both outcomes. We show moderate and heterogeneous changes in consumption, with an average increase of 2.8% by end of century. The results of our peak load simulations, however, suggest significant increases in the intensity and frequency of peak events throughout the United States, assuming today's technology and electricity market fundamentals. As the electricity grid is built to endure maximum load, our findings have significant implications for the construction of costly peak generating capacity, suggesting additional peak capacity costs of up to 180 billion dollars by the end of the century under business-as-usual.

  10. Handle with Care! Mid-Atlantic Marine Animals That Demand Your Respect. Educational Series No. 26. Third Printing.

    Science.gov (United States)

    Lucy, Jon

    Generally speaking, marine organisms found along middle Atlantic shores are not considered threatening to people. However, some of these animals can cause problems, either upon simple contact with the skin, as in the case of some jellyfish, or through careless handling. In addition, larger inhabitants of coastal waters (such as sharks) must always…

  11. Cut down the peak daytime demand for electricity at the residence; Jutaku ni okeru denryoku fuka heijunka

    Energy Technology Data Exchange (ETDEWEB)

    Ishihara, O. [Kumamoto University, Kumamoto (Japan). Faculty of Engineering

    1996-09-05

    For leveling of power load in small-scale buildings and houses, a test house with actual size was constructed in order to examine soil heat storage system using photovoltaic power generation system and nighttime power. A hundred of polycrystal silicone solar cells with about 5 kW and twenty of amorphous ones were fixed on the roof, to connect with commercial power source by the system interconnection having inverse power flow. For leveling of power load in the periods of heating and cooling, soil heat storage system was applied using nighttime power. Pipes for circulating cooling and heating water were embedded. Heat pump was operated only in the time zone of nighttime power, to obtain cooling and heating source for fan coil unit in the daytime. The sold power was larger than purchased power under continuous cooling condition for twelve hours in summer. Since cooling load was supplied from nighttime power with lower price, there was a large peak cut effect in the daytime. As a result of the tests using a house with actual size, the system was found to be applied practically both in summer and in winter. Effectiveness of peak cut of power load in summer was also provided. 7 refs., 10 figs., 2 tabs.

  12. Demand oriented biogas production to cover peak load; Bedarfsorientierte Biogasproduktion zur Erzeugung von Spitzenlaststrom. Weiterentwicklung der Biogastechnologie von Grundlast- zur Regelenergieerzeugung

    Energy Technology Data Exchange (ETDEWEB)

    Wallmann, Rainer; Ganagin, Waldemar; Loewe, Kirsten; Loewen, Achim [HAWK - Hochschule fuer angewandte Wissenschaft und Kunst, Fachhochschule Hildesheim, Holzminden, Goettingen (Germany)

    2010-08-15

    In contrast to solar and wind energy, biogas production is independent from environmental influences. The better part of biogas plants provide almost constant power and, thus, cover base load. However, it is possible to match biogas production with changing demand in different ways. Besides installing sufficiently dimensioned storages, a flexible generation of gas is possible by adjusting the digestion processes and installing appropriate control technologies. This enables flexible biogas production oriented towards customer demand. Peak load energy can be produced and marketed even without the advantage of reimbursement guaranteed by the renewable energy law. The Department of Sustainable Energy and Environmental Technology NEUTec at the University of Applied Science and Arts HAWK in Goettingen has carried out a research project to prove this concept of flexible biogas production. Operating a two-stage digestion plant, the capability to cover peak load was investigated by digesting energyrich liquid substrate in fixed bed reactors that represented the methanogenesis stage. These reactors showed extreme stability and flexibility. The promising results let expect a great potential of fixed bed reactors for on-demand biogas production from liquid substrates. In addition, with up to 80 % very high methane contents could be achieved in the produced gas. (orig.)

  13. A Study of the Impact of Peak Demand on Increasing Vulnerability of Cascading Failures to Extreme Contingency Events

    Energy Technology Data Exchange (ETDEWEB)

    Vyakaranam, Bharat GNVSR; Vallem, Mallikarjuna R.; Nguyen, Tony B.; Samaan, Nader A.; Berscheid, Alan P.; Makarov, Yuri V.; Diao, Ruisheng

    2017-10-02

    The vulnerability of large power systems to cascading failures and major blackouts has become evident since the Northeast blackout in 1965. Based on analyses of the series of cascading blackouts in the past decade, the research community realized the urgent need to develop better methods, tools, and practices for performing cascading-outage analysis and for evaluating mitigations that are easily accessible by utility planning engineers. PNNL has developed the Dynamic Contingency Analysis Tool (DCAT) as an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power planning engineers to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. DCAT analysis will help identify potential vulnerabilities and allow study of mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. Using the DCAT capability, we examined the impacts of various load conditions to identify situations in which the power grid may encounter cascading outages that could lead to potential blackouts. This paper describes the usefulness of the DCAT tool and how it helps to understand potential impacts of load demand on cascading failures on the power system.

  14. A Fresh Look at Weather Impact on Peak Electricity Demand and Energy Use of Buildings Using 30-Year Actual Weather Data

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Tianzhen; Chang, Wen-Kuei; Lin, Hung-Wen

    2013-05-01

    Buildings consume more than one third of the world?s total primary energy. Weather plays a unique and significant role as it directly affects the thermal loads and thus energy performance of buildings. The traditional simulated energy performance using Typical Meteorological Year (TMY) weather data represents the building performance for a typical year, but not necessarily the average or typical long-term performance as buildings with different energy systems and designs respond differently to weather changes. Furthermore, the single-year TMY simulations do not provide a range of results that capture yearly variations due to changing weather, which is important for building energy management, and for performing risk assessments of energy efficiency investments. This paper employs large-scale building simulation (a total of 3162 runs) to study the weather impact on peak electricity demand and energy use with the 30-year (1980 to 2009) Actual Meteorological Year (AMY) weather data for three types of office buildings at two design efficiency levels, across all 17 ASHRAE climate zones. The simulated results using the AMY data are compared to those from the TMY3 data to determine and analyze the differences. Besides further demonstration, as done by other studies, that actual weather has a significant impact on both the peak electricity demand and energy use of buildings, the main findings from the current study include: 1) annual weather variation has a greater impact on the peak electricity demand than it does on energy use in buildings; 2) the simulated energy use using the TMY3 weather data is not necessarily representative of the average energy use over a long period, and the TMY3 results can be significantly higher or lower than those from the AMY data; 3) the weather impact is greater for buildings in colder climates than warmer climates; 4) the weather impact on the medium-sized office building was the greatest, followed by the large office and then the small

  15. A fresh look at weather impact on peak electricity demand and energy use of buildings using 30-year actual weather data

    International Nuclear Information System (INIS)

    Hong, Tianzhen; Chang, Wen-Kuei; Lin, Hung-Wen

    2013-01-01

    Highlights: • Weather has a significant impact on both the peak electricity demand and energy use. • Weather impact varies with building type, building efficiency level, and location. • Simulated results using TMY3 weather data can under or over estimate those of AMY. • It is crucial to assess performance of buildings using long-term actual weather data. • Findings enable building stakeholders to make better decisions on weather impact. - Abstract: Buildings consume more than one third of the world’s total primary energy. Weather plays a unique and significant role as it directly affects the thermal loads and thus energy performance of buildings. The traditional simulated energy performance using Typical Meteorological Year (TMY) weather data represents the building performance for a typical year, but not necessarily the average or typical long-term performance as buildings with different energy systems and designs respond differently to weather changes. Furthermore, the single-year TMY simulations do not provide a range of results that capture yearly variations due to changing weather, which is important for building energy management, and for performing risk assessments of energy efficiency investments. This paper employs large-scale building simulation (a total of 3162 runs) to study the weather impact on peak electricity demand and energy use with the 30-year (1980–2009) Actual Meteorological Year (AMY) weather data for three types of office buildings at two design efficiency levels, across all 17 ASHRAE climate zones. The simulated results using the AMY data are compared to those from the TMY3 data to determine and analyze the differences. Besides further demonstration, as done by other studies, that actual weather has a significant impact on both the peak electricity demand and energy use of buildings, the main findings from the current study include: (1) annual weather variation has a greater impact on the peak electricity demand than it does

  16. Variability of electricity load patterns and its effect on demand response: A critical peak pricing experiment on Korean commercial and industrial customers

    International Nuclear Information System (INIS)

    Jang, Dongsik; Eom, Jiyong; Jae Park, Min; Jeung Rho, Jae

    2016-01-01

    To the extent that demand response represents an intentional electricity usage adjustment to price changes or incentive payments, consumers who exhibit more-variable load patterns on normal days may be capable of altering their loads more significantly in response to dynamic pricing plans. This study investigates the variation in the pre-enrollment load patterns of Korean commercial and industrial electricity customers and their impact on event-day loads during a critical peak pricing experiment in the winter of 2013. Contrary to conventional approaches to profiling electricity loads, this study proposes a new clustering technique based on variability indices that collectively represent the potential demand–response resource that these customers would supply. Our analysis reveals that variability in pre-enrollment load patterns does indeed have great predictive power for estimating their impact on demand–response loads. Customers in relatively low-variability clusters provided limited or no response, whereas customers in relatively high-variability clusters consistently presented large load impacts, accounting for most of the program-level peak reductions. This study suggests that dynamic pricing programs themselves may not offer adequate motivation for meaningful adjustments in load patterns, particularly for customers in low-variability clusters. - Highlights: • A method of clustering customers by variability indices is developed. • Customers in high-variability clusters provide substantial peak reductions. • Low-variability clusters exhibit limited reductions. • For low-variability customers, alternative policy instruments is well advised. • A model of discerning customer's demand response potential is suggested.

  17. Communication technologies for demand side management

    Energy Technology Data Exchange (ETDEWEB)

    Uuspaeae, P [VTT Energy, Espoo (Finland)

    1998-08-01

    The scope of this research is data communications for electric utilities, specifically for the purposes of Demand Side Management (DSM). Demand Side Management has the objective to change the customer`s end use of energy in a manner that benefits both the customer and the utility. For example, peak demand may be reduced, and the peak demand may be relocated to off peak periods. Thus additional investments in generation and network may be avoided. A number of Demand Side Management functions can be implemented if a communication system is available between the Electric Utility and the Customer. The total communication capacity that is needed, will depend on several factors, such as the functions that are chosen for DSM, and on the number and type of customers. Some functions may be handled with one-way communications, while some other functions need to have two-way communication

  18. The impact of peak oil on tourism in Spain: An input-output analysis of price, demand and economy-wide effects

    NARCIS (Netherlands)

    Logar, I.; van den Bergh, J.C.J.M.

    2013-01-01

    This article examines the potential effects of peak oil on Spanish tourism and indirectly on the rest of the economy. We construct several scenarios of price increases in oil, related fossil fuels and their inflationary effects. These scenarios provide the context for an input-output (I/O) analysis

  19. Does a rolling floor reduce the physical work demands and workload, and increase the productivity of truck drivers handling packed goods?

    NARCIS (Netherlands)

    Verschoof, Sandra; Kuijer, P. Paul F. M.; Frings-Dresen, Monique H. W.

    2005-01-01

    A PCM rolling floor (R) (RF) was developed to reduce the risk of musculoskeletal complaints among truck drivers. The RF can be used to move packed goods automatically in and out of the cargo space. The efficacy of this intervention on physical work demands, energetic and perceived workload and

  20. Ergonomics and patient handling.

    Science.gov (United States)

    McCoskey, Kelsey L

    2007-11-01

    This study aimed to describe patient-handling demands in inpatient units during a 24-hour period at a military health care facility. A 1-day total population survey described the diverse nature and impact of patient-handling tasks relative to a variety of nursing care units, patient characteristics, and transfer equipment. Productivity baselines were established based on patient dependency, physical exertion, type of transfer, and time spent performing the transfer. Descriptions of the physiological effect of transfers on staff based on patient, transfer, and staff characteristics were developed. Nursing staff response to surveys demonstrated how patient-handling demands are impacted by the staff's physical exertion and level of patient dependency. The findings of this study describe the types of transfers occurring in these inpatient units and the physical exertion and time requirements for these transfers. This description may guide selection of the most appropriate and cost-effective patient-handling equipment required for specific units and patients.

  1. Study on reduction of consumption and peak demand of electric power used in residential houses with solar heating and PV systems; Solar house no fuka heijunka to energy sakugen koka ni kansuru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Udagawa, M.; Endo, T. [Kogakuin University, Tokyo (Japan)

    1994-12-08

    A model house was simulated to reduce the consumption and peak demand for the photovoltaic power generation system, and solar heat air heating and hot water supply system in the solar house. As a type of construction, both wooden construction and reinforced concrete (RC) construction were selected with a total floor area of 125m{sup 2}. All the rooms were equipped with an air conditioner by heat pump from the air thermal source. A solar heat floor heater was simultaneously installed on the first floor. The hot water supply load was 4.8MWh per year. A commercial grid-connected on-site system was applied to the photovoltaic power generation with a 20m{sup 2} wide monocrystalline Si solar cell panel. As for the fluctuation in power load, the peak at the time of rising is more reduced in the RC house than in the wooden house, because the former is smaller in temperature fluctuation than the latter during the intermittence of air conditioning (as per the specified operational schedule). Therefore, the power is more leveled off in the former than in the latter. Between both, difference was hardly made in energy consumption per year. The ratio of dependency was 47% upon the photovoltaic power generation system, while it was 50% and 77%, under the air heating power load and hot water supply power load, respectively, upon the solar heat air heating and hot water supply system, so that both systems were considerably effective in saving the energy. 5 refs., 7 figs., 1 tab.

  2. Electricity demand forecasting techniques

    International Nuclear Information System (INIS)

    Gnanalingam, K.

    1994-01-01

    Electricity demand forecasting plays an important role in power generation. The two areas of data that have to be forecasted in a power system are peak demand which determines the capacity (MW) of the plant required and annual energy demand (GWH). Methods used in electricity demand forecasting include time trend analysis and econometric methods. In forecasting, identification of manpower demand, identification of key planning factors, decision on planning horizon, differentiation between prediction and projection (i.e. development of different scenarios) and choosing from different forecasting techniques are important

  3. Peak Oil, Peak Coal and Climate Change

    Science.gov (United States)

    Murray, J. W.

    2009-05-01

    Research on future climate change is driven by the family of scenarios developed for the IPCC assessment reports. These scenarios create projections of future energy demand using different story lines consisting of government policies, population projections, and economic models. None of these scenarios consider resources to be limiting. In many of these scenarios oil production is still increasing to 2100. Resource limitation (in a geological sense) is a real possibility that needs more serious consideration. The concept of 'Peak Oil' has been discussed since M. King Hubbert proposed in 1956 that US oil production would peak in 1970. His prediction was accurate. This concept is about production rate not reserves. For many oil producing countries (and all OPEC countries) reserves are closely guarded state secrets and appear to be overstated. Claims that the reserves are 'proven' cannot be independently verified. Hubbert's Linearization Model can be used to predict when half the ultimate oil will be produced and what the ultimate total cumulative production (Qt) will be. US oil production can be used as an example. This conceptual model shows that 90% of the ultimate US oil production (Qt = 225 billion barrels) will have occurred by 2011. This approach can then be used to suggest that total global production will be about 2200 billion barrels and that the half way point will be reached by about 2010. This amount is about 5 to 7 times less than assumed by the IPCC scenarios. The decline of Non-OPEC oil production appears to have started in 2004. Of the OPEC countries, only Saudi Arabia may have spare capacity, but even that is uncertain, because of lack of data transparency. The concept of 'Peak Coal' is more controversial, but even the US National Academy Report in 2007 concluded only a small fraction of previously estimated reserves in the US are actually minable reserves and that US reserves should be reassessed using modern methods. British coal production can be

  4. Practical load management - Peak shaving using photovoltaics

    International Nuclear Information System (INIS)

    Berger, W.

    2009-01-01

    This article takes a look at how photovoltaic (PV) power generation can be used in a practical way to meet peak demands for electricity. Advice is provided on how photovoltaics can provide peak load 'shaving' through the correlation between its production and the peak loads encountered during the day. The situation regarding feed-in tariffs in Italy is discussed, as are further examples of installations in Germany and Austria. Further, an initiative of the American Southern California Edison utility is discussed which foresees the installation of large PV plant on the roofs of commercial premises to provide local generation of peak energy and thus relieve demands on their power transportation network.

  5. Demand response in energy markets

    International Nuclear Information System (INIS)

    Skytte, K.; Birk Mortensen, J.

    2004-11-01

    Improving the ability of energy demand to respond to wholesale prices during critical periods of the spot market can reduce the total costs of reliably meeting demand, and the level and volatility of the prices. This fact has lead to a growing interest in the short-run demand response. There has especially been a growing interest in the electricity market where peak-load periods with high spot prices and occasional local blackouts have recently been seen. Market concentration at the supply side can result in even higher peak-load prices. Demand response by shifting demand from peak to base-load periods can counteract the market power in the peak-load. However, demand response has so far been modest since the current short-term price elasticity seems to be small. This is also the case for related markets, for example, green certificates where the demand is determined as a percentage of the power demand, or for heat and natural gas markets. This raises a number of interesting research issues: 1) Demand response in different energy markets, 2) Estimation of price elasticity and flexibility, 3) Stimulation of demand response, 4) Regulation, policy and modelling aspects, 5) Demand response and market power at the supply side, 6) Energy security of supply, 7) Demand response in forward, spot, ancillary service, balance and capacity markets, 8) Demand response in deviated markets, e.g., emission, futures, and green certificate markets, 9) Value of increased demand response, 10) Flexible households. (BA)

  6. Demand differentiation in inventory systems

    NARCIS (Netherlands)

    Kleijn, M.J.

    1998-01-01

    This book deals with inventory systems where customer demand is categorised into different classes. Most inventory systems do not take into account individual customer preferences for a given product, and therefore handle all demand in a similar way. Nowadays, market segmentation has become a

  7. UK Nuclear Workforce Demand

    International Nuclear Information System (INIS)

    Roberts, John

    2017-01-01

    UK Nuclear Sites: DECOMMISSIONING - 26 Magnox Reactors, 2 Fast Reactors; OPERATIONAL - 14 AGRs, 1 PWR; 9.6 GWe Total Capacity. Nuclear Workforce Demand • Total workforce demand is expected to grow from ~88,000 in 2017 to ~101,000 in 2021 • Average “inflow” is ~7,000 FTEs per annum • 22% of the workforce is female (28% in civil, 12% in defence) • 81% generic skills, 18% nuclear skills, 1% subject matter experts • 3300 trainees total in SLCs and Defence Enterprise (16% graduate trainees) • At peak demand on Civils Construction, over 4,000 workers will be required on each nuclear new build site • Manufacturing workforce is expected to rise from around 4,000 in 2014 to 8,500 at the peak of onsite activity in 2025

  8. Demand Uncertainty

    DEFF Research Database (Denmark)

    Nguyen, Daniel Xuyen

    This paper presents a model of trade that explains why firms wait to export and why many exporters fail. Firms face uncertain demands that are only realized after the firm enters the destination. The model retools the timing of uncertainty resolution found in productivity heterogeneity models....... This retooling addresses several shortcomings. First, the imperfect correlation of demands reconciles the sales variation observed in and across destinations. Second, since demands for the firm's output are correlated across destinations, a firm can use previously realized demands to forecast unknown demands...... in untested destinations. The option to forecast demands causes firms to delay exporting in order to gather more information about foreign demand. Third, since uncertainty is resolved after entry, many firms enter a destination and then exit after learning that they cannot profit. This prediction reconciles...

  9. Spatial peak-load pricing

    International Nuclear Information System (INIS)

    Arellano, M. Soledad; Serra, Pablo

    2007-01-01

    This article extends the traditional electricity peak-load pricing model to include transmission costs. In the context of a two-node, two-technology electric power system, where suppliers face inelastic demand, we show that when the marginal plant is located at the energy-importing center, generators located away from that center should pay the marginal capacity transmission cost; otherwise, consumers should bear this cost through capacity payments. Since electric power transmission is a natural monopoly, marginal-cost pricing does not fully cover costs. We propose distributing the revenue deficit among users in proportion to the surplus they derive from the service priced at marginal cost. (Author)

  10. 7 CFR 987.11 - Trade demand.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Trade demand. 987.11 Section 987.11 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... RIVERSIDE COUNTY, CALIFORNIA Order Regulating Handling Definitions § 987.11 Trade demand. Trade demand means...

  11. 7 CFR 981.21 - Trade demand.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Trade demand. 981.21 Section 981.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... Regulating Handling Definitions § 981.21 Trade demand. Trade demand means the quantity of almonds...

  12. Cut Electric Bills by Controlling Demand

    Science.gov (United States)

    Grumman, David L.

    1974-01-01

    Electric bills can be reduced by lowering electric consumption and by controlling demand -- the amount of electricity used at a certain point in time. Gives tips to help reduce electric demand at peak power periods. (Author/DN)

  13. Peak Experience Project

    Science.gov (United States)

    Scott, Daniel G.; Evans, Jessica

    2010-01-01

    This paper emerges from the continued analysis of data collected in a series of international studies concerning Childhood Peak Experiences (CPEs) based on developments in understanding peak experiences in Maslow's hierarchy of needs initiated by Dr Edward Hoffman. Bridging from the series of studies, Canadian researchers explore collected…

  14. Economic effects of peak oil

    International Nuclear Information System (INIS)

    Lutz, Christian; Lehr, Ulrike; Wiebe, Kirsten S.

    2012-01-01

    Assuming that global oil production peaked, this paper uses scenario analysis to show the economic effects of a possible supply shortage and corresponding rise in oil prices in the next decade on different sectors in Germany and other major economies such as the US, Japan, China, the OPEC or Russia. Due to the price-inelasticity of oil demand the supply shortage leads to a sharp increase in oil prices in the second scenario, with high effects on GDP comparable to the magnitude of the global financial crises in 2008/09. Oil exporting countries benefit from high oil prices, whereas oil importing countries are negatively affected. Generally, the effects in the third scenario are significantly smaller than in the second, showing that energy efficiency measures and the switch to renewable energy sources decreases the countries' dependence on oil imports and hence reduces their vulnerability to oil price shocks on the world market. - Highlights: ► National and sectoral economic effects of peak oil until 2020 are modelled. ► The price elasticity of oil demand is low resulting in high price fluctuations. ► Oil shortage strongly affects transport and indirectly all other sectors. ► Global macroeconomic effects are comparable to the 2008/2009 crisis. ► Country effects depend on oil imports and productivity, and economic structures.

  15. Electric peak power forecasting by year 2025

    International Nuclear Information System (INIS)

    Alsayegh, O.A.; Al-Matar, O.A.; Fairouz, F.A.; Al-Mulla Ali, A.

    2005-01-01

    Peak power demand in Kuwait up to the year 2025 was predicted using an artificial neural network (ANN) model. The aim of the study was to investigate the effect of air conditioning (A/C) units on long-term power demand. Five socio-economic factors were selected as inputs for the simulation: (1) gross national product, (2) population, (3) number of buildings, (4) imports of A/C units, and (5) index of industrial production. The study used socio-economic data from 1978 to 2000. Historical data of the first 10 years of the studied time period were used to train the ANN. The electrical network was then simulated to forecast peak power for the following 11 years. The calculated error was then used for years in which power consumption data were not available. The study demonstrated that average peak power rates increased by 4100 MW every 5 years. Various scenarios related to changes in population, the number of buildings, and the quantity of A/C units were then modelled to estimate long-term peak power demand. Results of the study demonstrated that population had the strongest impact on future power demand, while the number of buildings had the smallest impact. It was concluded that peak power growth can be controlled through the use of different immigration policies, increased A/C efficiency, and the use of vertical housing. 7 refs., 2 tabs., 6 figs

  16. Electric peak power forecasting by year 2025

    Energy Technology Data Exchange (ETDEWEB)

    Alsayegh, O.A.; Al-Matar, O.A.; Fairouz, F.A.; Al-Mulla Ali, A. [Kuwait Inst. for Scientific Research, Kuwait City (Kuwait). Div. of Environment and Urban Development

    2005-07-01

    Peak power demand in Kuwait up to the year 2025 was predicted using an artificial neural network (ANN) model. The aim of the study was to investigate the effect of air conditioning (A/C) units on long-term power demand. Five socio-economic factors were selected as inputs for the simulation: (1) gross national product, (2) population, (3) number of buildings, (4) imports of A/C units, and (5) index of industrial production. The study used socio-economic data from 1978 to 2000. Historical data of the first 10 years of the studied time period were used to train the ANN. The electrical network was then simulated to forecast peak power for the following 11 years. The calculated error was then used for years in which power consumption data were not available. The study demonstrated that average peak power rates increased by 4100 MW every 5 years. Various scenarios related to changes in population, the number of buildings, and the quantity of A/C units were then modelled to estimate long-term peak power demand. Results of the study demonstrated that population had the strongest impact on future power demand, while the number of buildings had the smallest impact. It was concluded that peak power growth can be controlled through the use of different immigration policies, increased A/C efficiency, and the use of vertical housing. 7 refs., 2 tabs., 6 figs.

  17. Nuclear fuel handling apparatus

    International Nuclear Information System (INIS)

    Andrea, C.; Dupen, C.F.G.; Noyes, R.C.

    1977-01-01

    A fuel handling machine for a liquid metal cooled nuclear reactor in which a retractable handling tube and gripper are lowered into the reactor to withdraw a spent fuel assembly into the handling tube. The handling tube containing the fuel assembly immersed in liquid sodium is then withdrawn completely from the reactor into the outer barrel of the handling machine. The machine is then used to transport the spent fuel assembly directly to a remotely located decay tank. The fuel handling machine includes a decay heat removal system which continuously removes heat from the interior of the handling tube and which is capable of operating at its full cooling capacity at all times. The handling tube is supported in the machine from an articulated joint which enables it to readily align itself with the correct position in the core. An emergency sodium supply is carried directly by the machine to provide make up in the event of a loss of sodium from the handling tube during transport to the decay tank. 5 claims, 32 drawing figures

  18. Peak-interviewet

    DEFF Research Database (Denmark)

    Raalskov, Jesper; Warming-Rasmussen, Bent

    Peak-interviewet er en særlig effektiv metode til at gøre ubevidste menneskelige ressourcer bevidste. Fokuspersonen (den interviewede) interviewes om en selvvalgt, personlig succesoplevelse. Terapeuten/coachen (intervieweren) spørger ind til processen, som ledte hen til denne succes. Herved afdæk...... fokuspersonen ønsker at tage op (nye mål eller nye processer). Nærværende workingpaper beskriver, hvad der menes med et peak-interview, peakinterviwets teoretiske fundament samt metodikken til at foretage et tillidsfuldt og effektiv peak-interview....

  19. Peak power ratio generator

    Science.gov (United States)

    Moyer, R.D.

    A peak power ratio generator is described for measuring, in combination with a conventional power meter, the peak power level of extremely narrow pulses in the gigahertz radio frequency bands. The present invention in a preferred embodiment utilizes a tunnel diode and a back diode combination in a detector circuit as the only high speed elements. The high speed tunnel diode provides a bistable signal and serves as a memory device of the input pulses for the remaining, slower components. A hybrid digital and analog loop maintains the peak power level of a reference channel at a known amount. Thus, by measuring the average power levels of the reference signal and the source signal, the peak power level of the source signal can be determined.

  20. How to Handle Abuse

    Science.gov (United States)

    ... Handle Abuse KidsHealth / For Kids / How to Handle Abuse What's in this article? Tell Right Away How Do You Know Something Is Abuse? ... babysitter, teacher, coach, or a bigger kid. Child abuse can happen anywhere — at ... building. Tell Right Away A kid who is being seriously hurt ...

  1. Grain Handling and Storage.

    Science.gov (United States)

    Harris, Troy G.; Minor, John

    This text for a secondary- or postecondary-level course in grain handling and storage contains ten chapters. Chapter titles are (1) Introduction to Grain Handling and Storage, (2) Elevator Safety, (3) Grain Grading and Seed Identification, (4) Moisture Control, (5) Insect and Rodent Control, (6) Grain Inventory Control, (7) Elevator Maintenance,…

  2. Peak regulation right

    International Nuclear Information System (INIS)

    Gao, Z. |; Ren, Z.; Li, Z.; Zhu, R.

    2005-01-01

    A peak regulation right concept and corresponding transaction mechanism for an electricity market was presented. The market was based on a power pool and independent system operator (ISO) model. Peak regulation right (PRR) was defined as a downward regulation capacity purchase option which allowed PRR owners to buy certain quantities of peak regulation capacity (PRC) at a specific price during a specified period from suppliers. The PRR owner also had the right to decide whether or not they would buy PRC from suppliers. It was the power pool's responsibility to provide competitive and fair peak regulation trading markets to participants. The introduction of PRR allowed for unit capacity regulation. The PRR and PRC were rated by the supplier, and transactions proceeded through a bidding process. PRR suppliers obtained profits by selling PRR and PRC, and obtained downward regulation fees regardless of whether purchases are made. It was concluded that the peak regulation mechanism reduced the total cost of the generating system and increased the social surplus. 6 refs., 1 tab., 3 figs

  3. Sulphur demand growing. [Alberta

    Energy Technology Data Exchange (ETDEWEB)

    1975-01-20

    Sulfur markets look better going into 1975 than they have for several years, as North American demand growth is being filled largely by elemental sulfur producers and overseas. Demand is rising as fast as the capacity of Canadian transportation and handling facilities. It will take a long time to make much of a dent in the total Alberta stockpile of 14 million long tons at the end of 1974, with involuntary production from sour gas plants exceeding sales volume since 1972. However, there is some encouragement in the approaching peakout of production combined with a substantial increase in price since the low point of the cycle at the beginning of 1973, and a predicted rise of at least 20% in domestic (North American) sales this year over 1974.

  4. Make peak flow a habit

    Science.gov (United States)

    Asthma - make peak flow a habit; Reactive airway disease - peak flow; Bronchial asthma - peak flow ... 2014:chap 55. National Asthma Education and Prevention Program website. How to use a peak flow meter. ...

  5. Automated asteroseismic peak detections

    DEFF Research Database (Denmark)

    de Montellano, Andres Garcia Saravia Ortiz; Hekker, S.; Themessl, N.

    2018-01-01

    Space observatories such as Kepler have provided data that can potentially revolutionize our understanding of stars. Through detailed asteroseismic analyses we are capable of determining fundamental stellar parameters and reveal the stellar internal structure with unprecedented accuracy. However......, such detailed analyses, known as peak bagging, have so far been obtained for only a small percentage of the observed stars while most of the scientific potential of the available data remains unexplored. One of the major challenges in peak bagging is identifying how many solar-like oscillation modes are visible...... of detected oscillation modes. The algorithm presented here opens the possibility for detailed and automated peak bagging of the thousands of solar-like oscillators observed by Kepler....

  6. Automated asteroseismic peak detections

    Science.gov (United States)

    García Saravia Ortiz de Montellano, Andrés; Hekker, S.; Themeßl, N.

    2018-05-01

    Space observatories such as Kepler have provided data that can potentially revolutionize our understanding of stars. Through detailed asteroseismic analyses we are capable of determining fundamental stellar parameters and reveal the stellar internal structure with unprecedented accuracy. However, such detailed analyses, known as peak bagging, have so far been obtained for only a small percentage of the observed stars while most of the scientific potential of the available data remains unexplored. One of the major challenges in peak bagging is identifying how many solar-like oscillation modes are visible in a power density spectrum. Identification of oscillation modes is usually done by visual inspection that is time-consuming and has a degree of subjectivity. Here, we present a peak-detection algorithm especially suited for the detection of solar-like oscillations. It reliably characterizes the solar-like oscillations in a power density spectrum and estimates their parameters without human intervention. Furthermore, we provide a metric to characterize the false positive and false negative rates to provide further information about the reliability of a detected oscillation mode or the significance of a lack of detected oscillation modes. The algorithm presented here opens the possibility for detailed and automated peak bagging of the thousands of solar-like oscillators observed by Kepler.

  7. Handling Pyrophoric Reagents

    Energy Technology Data Exchange (ETDEWEB)

    Alnajjar, Mikhail S.; Haynie, Todd O.

    2009-08-14

    Pyrophoric reagents are extremely hazardous. Special handling techniques are required to prevent contact with air and the resulting fire. This document provides several methods for working with pyrophoric reagents outside of an inert atmosphere.

  8. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  9. 7 CFR 993.21b - Trade demand.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Trade demand. 993.21b Section 993.21b Agriculture... Order Regulating Handling Definitions § 993.21b Trade demand. (a) Domestic trade demand. The quantity of... domestic markets for human consumption as prunes and prune products. (b) Foreign trade demand. The quantity...

  10. 7 CFR 984.22 - Trade demand.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Trade demand. 984.22 Section 984.22 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... Regulating Handling Definitions § 984.22 Trade demand. (a) Inshell. The quantity of merchantable inshell...

  11. Remote handling machines

    International Nuclear Information System (INIS)

    Sato, Shinri

    1985-01-01

    In nuclear power facilities, the management of radioactive wastes is made with its technology plus the automatic techniques. Under the radiation field, the maintenance or aid of such systems is important. To cope with this situation, MF-2 system, MF-3 system and a manipulator system as remote handling machines are described. MF-2 system consists of an MF-2 carrier truck, a control unit and a command trailer. It is capable of handling heavy-weight objects. The system is not by hydraulic but by electrical means. MF-3 system consists of a four-crawler truck and a manipulator. The truck is versatile in its posture by means of the four independent crawlers. The manipulator system is bilateral in operation, so that the delicate handling is made possible. (Mori, K.)

  12. Practices of Handling

    DEFF Research Database (Denmark)

    Ræbild, Ulla

    to touch, pick up, carry, or feel with the hands. Figuratively it is to manage, deal with, direct, train, or control. Additionally, as a noun, a handle is something by which we grasp or open up something. Lastly, handle also has a Nordic root, here meaning to trade, bargain or deal. Together all four...... meanings seem to merge in the fashion design process, thus opening up for an embodied engagement with matter that entails direction giving, organizational management and negotiation. By seeing processes of handling as a key fashion methodological practice, it is possible to divert the discourse away from...... introduces four ways whereby fashion designers apply their own bodies as tools for design; a) re-activating past garment-design experiences, b) testing present garment-design experiences c) probing for new garment-design experiences and d) design of future garment experiences by body proxy. The paper...

  13. Remote handling at LAMPF

    International Nuclear Information System (INIS)

    Grisham, D.L.; Lambert, J.E.

    1983-01-01

    Experimental area A at the Clinton P. Anderson Meson Physics Facility (LAMPF) encompasses a large area. Presently there are four experimental target cells along the main proton beam line that have become highly radioactive, thus dictating that all maintenance be performed remotely. The Monitor remote handling system was developed to perform in situ maintenance at any location within area A. Due to the complexity of experimental systems and confined space, conventional remote handling methods based upon hot cell and/or hot bay concepts are not workable. Contrary to conventional remote handling which require special tooling for each specifically planned operation, the Monitor concept is aimed at providing a totally flexible system capable of remotely performing general mechanical and electrical maintenance operations using standard tools. The Monitor system is described

  14. TRANSPORT/HANDLING REQUESTS

    CERN Multimedia

    Groupe ST/HM

    2002-01-01

    A new EDH document entitled 'Transport/Handling Request' will be in operation as of Monday, 11th February 2002, when the corresponding icon will be accessible from the EDH desktop, together with the application instructions. This EDH form will replace the paper-format transport/handling request form for all activities involving the transport of equipment and materials. However, the paper form will still be used for all vehicle-hire requests. The introduction of the EDH transport/handling request form is accompanied by the establishment of the following time limits for the various services concerned: 24 hours for the removal of office items, 48 hours for the transport of heavy items (of up to 6 metric tons and of standard road width), 5 working days for a crane operation, extra-heavy transport operation or complete removal, 5 working days for all transport operations relating to LHC installation. ST/HM Group, Logistics Section Tel: 72672 - 72202

  15. Peak reading detector circuit

    International Nuclear Information System (INIS)

    Courtin, E.; Grund, K.; Traub, S.; Zeeb, H.

    1975-01-01

    The peak reading detector circuit serves for picking up the instants during which peaks of a given polarity occur in sequences of signals in which the extreme values, their time intervals, and the curve shape of the signals vary. The signal sequences appear in measuring the foetal heart beat frequence from amplitude-modulated ultrasonic, electrocardiagram, and blood pressure signals. In order to prevent undesired emission of output signals from, e. g., disturbing intermediate extreme values, the circuit consists of the series connections of a circuit to simulate an ideal diode, a strong unit, a discriminator for the direction of charging current, a time-delay circuit, and an electronic switch lying in the decharging circuit of the storage unit. The time-delay circuit thereby causes storing of a preliminary maximum value being used only after a certain time delay for the emission of the output signal. If a larger extreme value occurs during the delay time the preliminary maximum value is cleared and the delay time starts running anew. (DG/PB) [de

  16. In demand

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, B. [Bridgestone Ltd. (United Kingdom)

    2005-11-01

    The paper explains how good relationships can help alleviate potential tyre shortages. Demand for large dump truck tyres (largely for China) has increased by 50% within 12 months. Bridgestone's manufacturing plants are operating at maximum capacity. The company supplies tyres to all vehicles at Scottish Coal's opencast coal mines. Its Tyre Management System (TMS) supplied free of charge to customers helps maximise tyre life and minimise downtime from data on pressure, tread and general conditions fed into the hand-held TMS computer. 3 photos.

  17. Ontario demand response scenarios

    International Nuclear Information System (INIS)

    Rowlands, I.H.

    2005-09-01

    Strategies for demand management in Ontario were examined via 2 scenarios for a commercial/institutional building with a normal summertime peak load of 300 kW between 14:00 and 18:00 during a period of high electricity demand and high electricity prices. The first scenario involved the deployment of a 150 kW on-site generator fuelled by either diesel or natural gas. The second scenario involved curtailing load by 60 kW during the same periods. Costs and benefits of both scenarios were evaluated for 3 groups: consumers, system operators and society. Benefits included electricity cost savings, deferred transmission capacity development, lower system prices for electricity, as well as environmental changes, economic development, and a greater sense of corporate social responsibility. It was noted that while significant benefits were observed for all 3 groups, they were not substantial enough to encourage action, as the savings arising from deferred generation capacity development do not accrue to individual players. The largest potential benefit was identified as lower prices, spread across all users of electricity in Ontario. It was recommended that representative bodies cooperate so that the system-wide benefits can be reaped. It was noted that if 10 municipal utilities were able to have 250 commercial or institutional customers engaged in distributed response, then a total peak demand reduction of 375 MW could be achieved, representing more than 25 per cent of Ontario's target for energy conservation. It was concluded that demand response often involves the investment of capital and new on-site procedures, which may affect reactions to various incentives. 78 refs., 10 tabs., 5 figs

  18. Safe handling of tritium

    International Nuclear Information System (INIS)

    1991-01-01

    The main objective of this publication is to provide practical guidance and recommendations on operational radiation protection aspects related to the safe handling of tritium in laboratories, industrial-scale nuclear facilities such as heavy-water reactors, tritium removal plants and fission fuel reprocessing plants, and facilities for manufacturing commercial tritium-containing devices and radiochemicals. The requirements of nuclear fusion reactors are not addressed specifically, since there is as yet no tritium handling experience with them. However, much of the material covered is expected to be relevant to them as well. Annex III briefly addresses problems in the comparatively small-scale use of tritium at universities, medical research centres and similar establishments. However, the main subject of this publication is the handling of larger quantities of tritium. Operational aspects include designing for tritium safety, safe handling practice, the selection of tritium-compatible materials and equipment, exposure assessment, monitoring, contamination control and the design and use of personal protective equipment. This publication does not address the technologies involved in tritium control and cleanup of effluents, tritium removal, or immobilization and disposal of tritium wastes, nor does it address the environmental behaviour of tritium. Refs, figs and tabs

  19. Grain Grading and Handling.

    Science.gov (United States)

    Rendleman, Matt; Legacy, James

    This publication provides an introduction to grain grading and handling for adult students in vocational and technical education programs. Organized in five chapters, the booklet provides a brief overview of the jobs performed at a grain elevator and of the techniques used to grade grain. The first chapter introduces the grain industry and…

  20. Mars Sample Handling Functionality

    Science.gov (United States)

    Meyer, M. A.; Mattingly, R. L.

    2018-04-01

    The final leg of a Mars Sample Return campaign would be an entity that we have referred to as Mars Returned Sample Handling (MRSH.) This talk will address our current view of the functional requirements on MRSH, focused on the Sample Receiving Facility (SRF).

  1. Handling wood shavings

    Energy Technology Data Exchange (ETDEWEB)

    1974-09-18

    Details of bulk handling equipment suitable for collection and compressing wood waste from commercial joinery works are discussed. The Redler Bin Discharger ensures free flow of chips from storage silo discharge prior to compression into briquettes for use as fuel or processing into chipboard.

  2. Pay for load demand - electricity pricing with load demand component

    International Nuclear Information System (INIS)

    Pyrko, Jurek; Sernhed, Kerstin; Abaravicius, Juozas

    2003-01-01

    This publication is part of a project called Direct and Indirect Load Control in Buildings. Peak load problems have attracted considerable attention in Sweden during last three winters, caused by a significant decrease in available reserve power, which is a consequence of political decisions and liberalisation of the electricity market. A possible way to lower peak loads, avoiding electricity shortages and reducing electricity costs both for users and utilities, is to make customers experience the price difference during peak load periods and, in this way, become more aware of their energy consumption pattern and load demand. As of January 1st 2001, one of the Swedish energy utilities - Sollentuna Energi - operating in the Stockholm area, introduced a new electricity tariff with differentiated grid fees based on a mean value of the peak load every month. This tariff was introduced for all residential customers in the service area. The objective of this study is to investigate the extent to which a Load Demand Component, included in electricity pricing, can influence energy use and load demand in residential buildings. What are the benefits and disadvantages for customers and utilities? This paper investigates the impact of the new tariff on the utility and different types of typical residential customers, making comparisons with previous tariff. Keywords Load demand, electricity pricing, tariff, residential customers, energy behaviour

  3. Test sample handling apparatus

    International Nuclear Information System (INIS)

    1981-01-01

    A test sample handling apparatus using automatic scintillation counting for gamma detection, for use in such fields as radioimmunoassay, is described. The apparatus automatically and continuously counts large numbers of samples rapidly and efficiently by the simultaneous counting of two samples. By means of sequential ordering of non-sequential counting data, it is possible to obtain precisely ordered data while utilizing sample carrier holders having a minimum length. (U.K.)

  4. Handling and Transport Problems

    Energy Technology Data Exchange (ETDEWEB)

    Pomarola, J. [Head of Technical Section, Atomic Energy Commission, Saclay (France); Savouyaud, J. [Head of Electro-Mechanical Sub-Division, Atomic Energy Commission, Saclay (France)

    1960-07-01

    Arrangements for special or dangerous transport operations by road arising out of the activities of the Atomic Energy Commission are made by the Works and Installations Division which acts in concert with the Monitoring and Protection Division (MPD) whenever radioactive substances or appliances are involved. In view of the risk of irradiation and contamination entailed in handling and transporting radioactive substances, including waste, a specialized transport and storage team has been formed as a complement to the emergency and decontamination teams.

  5. Solid waste handling

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1995-01-01

    This study presents estimates of the solid radioactive waste quantities that will be generated in the Separations, Low-Level Waste Vitrification and High-Level Waste Vitrification facilities, collectively called the Tank Waste Remediation System Treatment Complex, over the life of these facilities. This study then considers previous estimates from other 200 Area generators and compares alternative methods of handling (segregation, packaging, assaying, shipping, etc.)

  6. Handling of radioactive waste

    International Nuclear Information System (INIS)

    Sanhueza Mir, Azucena

    1998-01-01

    Based on characteristics and quantities of different types of radioactive waste produced in the country, achievements in infrastructure and the way to solve problems related with radioactive waste handling and management, are presented in this paper. Objectives of maintaining facilities and capacities for controlling, processing and storing radioactive waste in a conditioned form, are attained, within a great range of legal framework, so defined to contribute with safety to people and environment (au)

  7. Renal phosphate handling: Physiology

    Directory of Open Access Journals (Sweden)

    Narayan Prasad

    2013-01-01

    Full Text Available Phosphorus is a common anion. It plays an important role in energy generation. Renal phosphate handling is regulated by three organs parathyroid, kidney and bone through feedback loops. These counter regulatory loops also regulate intestinal absorption and thus maintain serum phosphorus concentration in physiologic range. The parathyroid hormone, vitamin D, Fibrogenic growth factor 23 (FGF23 and klotho coreceptor are the key regulators of phosphorus balance in body.

  8. Uranium hexafluoride handling

    International Nuclear Information System (INIS)

    1991-01-01

    The United States Department of Energy, Oak Ridge Field Office, and Martin Marietta Energy Systems, Inc., are co-sponsoring this Second International Conference on Uranium Hexafluoride Handling. The conference is offered as a forum for the exchange of information and concepts regarding the technical and regulatory issues and the safety aspects which relate to the handling of uranium hexafluoride. Through the papers presented here, we attempt not only to share technological advances and lessons learned, but also to demonstrate that we are concerned about the health and safety of our workers and the public, and are good stewards of the environment in which we all work and live. These proceedings are a compilation of the work of many experts in that phase of world-wide industry which comprises the nuclear fuel cycle. Their experience spans the entire range over which uranium hexafluoride is involved in the fuel cycle, from the production of UF 6 from the naturally-occurring oxide to its re-conversion to oxide for reactor fuels. The papers furnish insights into the chemical, physical, and nuclear properties of uranium hexafluoride as they influence its transport, storage, and the design and operation of plant-scale facilities for production, processing, and conversion to oxide. The papers demonstrate, in an industry often cited for its excellent safety record, continuing efforts to further improve safety in all areas of handling uranium hexafluoride

  9. Uranium hexafluoride handling. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    The United States Department of Energy, Oak Ridge Field Office, and Martin Marietta Energy Systems, Inc., are co-sponsoring this Second International Conference on Uranium Hexafluoride Handling. The conference is offered as a forum for the exchange of information and concepts regarding the technical and regulatory issues and the safety aspects which relate to the handling of uranium hexafluoride. Through the papers presented here, we attempt not only to share technological advances and lessons learned, but also to demonstrate that we are concerned about the health and safety of our workers and the public, and are good stewards of the environment in which we all work and live. These proceedings are a compilation of the work of many experts in that phase of world-wide industry which comprises the nuclear fuel cycle. Their experience spans the entire range over which uranium hexafluoride is involved in the fuel cycle, from the production of UF{sub 6} from the naturally-occurring oxide to its re-conversion to oxide for reactor fuels. The papers furnish insights into the chemical, physical, and nuclear properties of uranium hexafluoride as they influence its transport, storage, and the design and operation of plant-scale facilities for production, processing, and conversion to oxide. The papers demonstrate, in an industry often cited for its excellent safety record, continuing efforts to further improve safety in all areas of handling uranium hexafluoride. Selected papers were processed separately for inclusion in the Energy Science and Technology Database.

  10. Torus sector handling system

    International Nuclear Information System (INIS)

    Grisham, D.L.

    1981-01-01

    A remote handling system is proposed for moving a torus sector of the accelerator from under the cryostat to a point where it can be handled by a crane and for the reverse process for a new sector. Equipment recommendations are presented, as well as possible alignment schemes. Some general comments about future remote-handling methods and the present capabilities of existing systems will also be included. The specific task to be addressed is the removal and replacement of a 425 to 450 ton torus sector. This requires a horizontal movement of approx. 10 m from a normal operating position to a point where its further transport can be accomplished by more conventional means (crane or floor transporter). The same horizontal movement is required for reinstallation, but a positional tolerance of 2 cm is required to allow reasonable fit-up for the vacuum seal from the radial frames to the torus sector. Since the sectors are not only heavy but rather tall and narrow, the transport system must provide a safe, stable, and repeatable method fo sector movement. This limited study indicates that the LAMPF-based method of transporting torus sectors offers a proven method of moving heavy items. In addition, the present state of the art in remote equipment is adequate for FED maintenance

  11. Handling of Solid Residues

    International Nuclear Information System (INIS)

    Medina Bermudez, Clara Ines

    1999-01-01

    The topic of solid residues is specifically of great interest and concern for the authorities, institutions and community that identify in them a true threat against the human health and the atmosphere in the related with the aesthetic deterioration of the urban centers and of the natural landscape; in the proliferation of vectorial transmitters of illnesses and the effect on the biodiversity. Inside the wide spectrum of topics that they keep relationship with the environmental protection, the inadequate handling of solid residues and residues dangerous squatter an important line in the definition of political and practical environmentally sustainable. The industrial development and the population's growth have originated a continuous increase in the production of solid residues; of equal it forms, their composition day after day is more heterogeneous. The base for the good handling includes the appropriate intervention of the different stages of an integral administration of residues, which include the separation in the source, the gathering, the handling, the use, treatment, final disposition and the institutional organization of the administration. The topic of the dangerous residues generates more expectation. These residues understand from those of pathogen type that are generated in the establishments of health that of hospital attention, until those of combustible, inflammable type, explosive, radio-active, volatile, corrosive, reagent or toxic, associated to numerous industrial processes, common in our countries in development

  12. A Perspective on Remote Handling Operations and Human Machine Interface for Remote Handling in Fusion

    International Nuclear Information System (INIS)

    Haist, B.; Hamilton, D.; Sanders, St.

    2006-01-01

    A large-scale fusion device presents many challenges to the remote handling operations team. This paper is based on unique operational experience at JET and gives a perspective on remote handling task development, logistics and resource management, as well as command, control and human-machine interface systems. Remote operations require an accurate perception of a dynamic environment, ideally providing the operators with the same unrestricted knowledge of the task scene as would be available if they were actually at the remote work location. Traditional camera based systems suffer from a limited number of viewpoints and also degrade quickly when exposed to high radiation. Virtual Reality and Augmented Reality software offer great assistance. The remote handling system required to maintain a tokamak requires a large number of different and complex pieces of equipment coordinating to perform a large array of tasks. The demands on the operator's skill in performing the tasks can escalate to a point where the efficiency and safety of operations are compromised. An operations guidance system designed to facilitate the planning, development, validation and execution of remote handling procedures is essential. Automatic planning of motion trajectories of remote handling equipment and the remote transfer of heavy loads will be routine and need to be reliable. This paper discusses the solutions developed at JET in these areas and also the trends in management and presentation of operational data as well as command, control and HMI technology development offering the potential to greatly assist remote handling in future fusion machines. (author)

  13. Measurement of biological oxygen demand sandy beaches

    African Journals Online (AJOL)

    Measurements of biological oxygen demand in a sandy beach using conventional .... counting the cells present in a sample of aged seawater and comparing this with .... This activity peaked at 71 % above the undisturbed level after 16 hours.

  14. A future Demand Side Management (DSM) opportunity for utility as variable renewable penetrate scale up using agriculture.

    Science.gov (United States)

    Ines, A.; Bhattacharjee, A.; Modi, V.; Robertson, A. W.; Lall, U.; Kocaman Ayse, S.; Chaudhary, S.; Kumar, A.; Ganapathy, A.; Kumar, A.; Mishra, V.

    2015-12-01

    Energy demand management, also known as demand side management (DSM), is the modification of consumer demand for energy through various methods such as smart metering, incentive based schemes, payments for turning off loads or rescheduling loads. Usually, the goal of demand side management is to encourage the consumer to use less power during periods of peak demand, or to move the time of energy use to off-peak times. Peak demand management does not necessarily decrease total energy consumption, but could be expected to reduce the need for investments in networks and/or power plants for meeting peak demands. Electricity use can vary dramatically on short and medium time frames, and the pricing system may not reflect the instantaneous cost as additional higher-cost that are brought on-line. In addition, the capacity or willingness of electricity consumers to adjust to prices by altering elasticity of demand may be low, particularly over short time frames. In the scenario of Indian grid setup, the retail customers do not follow real-time pricing and it is difficult to incentivize the utility companies for continuing the peak demand supply. A question for the future is how deeper penetration of renewable will be handled? This is a challenging problem since one has to deal with high variability, while managing loss of load probabilities. In the case of managing the peak demand using agriculture, in the future as smart metering matures with automatic turn on/off for a pump, it will become possible to provide an ensured amount of water or energy to the farmer while keeping the grid energized for 24 hours. Supply scenarios will include the possibility of much larger penetration of solar and wind into the grid. While, in absolute terms these sources are small contributors, their role will inevitably grow but DSM using agriculture could help reduce the capital cost. The other option is of advancing or delaying pump operating cycle even by several hours, will still ensure

  15. Peak load arrangements : Assessment of Nordel guidelines

    Energy Technology Data Exchange (ETDEWEB)

    2009-07-01

    Two Nordic countries, Sweden and Finland, have legislation that empowers the TSO to acquire designated peak load resources to mitigate the risk for shortage situations during the winter. In Denmark, the system operator procures resources to maintain a satisfactory level of security of supply. In Norway the TSO has set up a Regulation Power Option Market (RKOM) to secure a satisfactory level of operational reserves at all times, also in winter with high load demand. Only the arrangements in Finland and Sweden fall under the heading of Peak Load Arrangements defined in Nordel Guidelines. NordREG has been invited by the Electricity Market Group (EMG) to evaluate Nordel's proposal for 'Guidelines for transitional Peak Load Arrangements'. The EMG has also financed a study made by EC Group to support NordREG in the evaluation of the proposal. The study has been taken into account in NordREG's evaluation. In parallel to the EMG task, the Swedish regulator, the Energy Markets Inspectorate, has been given the task by the Swedish government to investigate a long term solution of the peak load issue. The Swedish and Finnish TSOs have together with Nord Pool Spot worked on finding a harmonized solution for activation of the peak load reserves in the market. An agreement accepted by the relevant authorities was reached in early January 2009, and the arrangement has been implemented since 19th January 2009. NordREG views that the proposed Nordel guidelines have served as a starting point for the presently agreed procedure. However, NordREG does not see any need to further develop the Nordel guidelines for peak load arrangements. NordREG agrees with Nordel that the market should be designed to solve peak load problems through proper incentives to market players. NordREG presumes that the relevant authorities in each country will take decisions on the need for any peak load arrangement to ensure security of supply. NordREG proposes that such decisions should be

  16. Managing peak loads in energy grids: Comparative economic analysis

    International Nuclear Information System (INIS)

    Zhuk, A.; Zeigarnik, Yu.; Buzoverov, E.; Sheindlin, A.

    2016-01-01

    One of the key issues in modern energy technology is managing the imbalance between the generated power and the load, particularly during times of peak demand. The increasing use of renewable energy sources makes this problem even more acute. Various existing technologies, including stationary battery energy storage systems (BESS), can be employed to provide additional power during peak demand times. In the future, integration of on-board batteries of the growing fleet of electric vehicles (EV) and plug-in hybrid electric vehicles (PHEV) into the grid can provide power during peak demand hours (vehicle-to-grid, or V2G technology). This work provides cost estimates of managing peak energy demands using traditional technologies, such as maneuverable power plants, conventional hydroelectric, pumped storage plants and peaker generators, as well as BESS and V2G technologies. The derived estimates provide both per kWh and kW year of energy supplied to the grid. The analysis demonstrates that the use of battery storage is economically justified for short peak demand periods of <1 h. For longer durations, the most suitable technology remains the use of maneuverable steam gas power plants, gas turbine,reciprocating gas engine peaker generators, conventional hydroelectric, pumped storage plants. - Highlights: • Cost of managing peak energy demand employing different technologies are estimated. • Traditional technologies, stationary battery storage and V2G are compared. • Battery storage is economically justified for peak demand periods of <1 h. • V2G appears to have better efficiency than stationary battery storage in low voltage power grids.

  17. Preference Handling for Artificial Intelligence

    OpenAIRE

    Goldsmith, Judy; University of Kentucky; Junker, Ulrich; ILOG

    2009-01-01

    This article explains the benefits of preferences for AI systems and draws a picture of current AI research on preference handling. It thus provides an introduction to the topics covered by this special issue on preference handling.

  18. Crud handling circuit

    International Nuclear Information System (INIS)

    Smith, J.C.; Manuel, R.J.; McAllister, J.E.

    1981-01-01

    A process for handling the problems of crud formation during the solvent extraction of wet-process phosphoric acid, e.g. for uranium and rare earth removal, is described. It involves clarification of the crud-solvent mixture, settling, water washing the residue and treatment of the crud with a caustic wash to remove and regenerate the solvent. Applicable to synergistic mixtures of dialkylphosphoric acids and trialkylphosphine oxides dissolved in inert diluents and more preferably to the reductive stripping technique. (U.K.)

  19. Handling of potassium

    International Nuclear Information System (INIS)

    Schwarz, N.; Komurka, M.

    1983-03-01

    As a result for the Fast Breeder Development extensive experience is available worldwide with respect to Sodium technology. Due to the extension of the research program to topping cycles with Potassium as the working medium, test facilities with Potassium have been designed and operated in the Institute of Reactor Safety. The different chemical properties of Sodium and Potassium give rise in new safety concepts and operating procedures. The handling problems of Potassium are described in the light of theoretical properties and own experiences. Selected literature on main safety and operating problems complete this report. (Author) [de

  20. Extreme coal handling

    Energy Technology Data Exchange (ETDEWEB)

    Bradbury, S; Homleid, D. [Air Control Science Inc. (United States)

    2004-04-01

    Within the journals 'Focus on O & M' is a short article describing modifications to coal handling systems at Eielson Air Force Base near Fairbanks, Alaska, which is supplied with power and heat from a subbituminous coal-fired central plant. Measures to reduce dust include addition of an enclosed recirculation chamber at each transfer point and new chute designs to reduce coal velocity, turbulence, and induced air. The modifications were developed by Air Control Science (ACS). 7 figs., 1 tab.

  1. Cellular Manufacturing System with Dynamic Lot Size Material Handling

    Science.gov (United States)

    Khannan, M. S. A.; Maruf, A.; Wangsaputra, R.; Sutrisno, S.; Wibawa, T.

    2016-02-01

    Material Handling take as important role in Cellular Manufacturing System (CMS) design. In several study at CMS design material handling was assumed per pieces or with constant lot size. In real industrial practice, lot size may change during rolling period to cope with demand changes. This study develops CMS Model with Dynamic Lot Size Material Handling. Integer Linear Programming is used to solve the problem. Objective function of this model is minimizing total expected cost consisting machinery depreciation cost, operating costs, inter-cell material handling cost, intra-cell material handling cost, machine relocation costs, setup costs, and production planning cost. This model determines optimum cell formation and optimum lot size. Numerical examples are elaborated in the paper to ilustrate the characterictic of the model.

  2. Environmental impacts of public transport. Why peak-period travellers cause a greater environmental burden than off-peak travellers

    International Nuclear Information System (INIS)

    Rietveld, P.

    2002-01-01

    Given the difference between peak and off-peak occupancy rates in public transport, emissions per traveller kilometre are lower in the peak than in the off-peak period, whereas the opposite pattern is observed for cars. It is argued that it is much more fruitful to analyse environmental effects in marginal terms. This calls for a careful analysis of capacity management policies of public transport suppliers that are facing increased demand during both peak and off-peak periods. A detailed analysis of capacity management by the Netherlands Railways (NS) revealed that off-peak capacity supply is mainly dictated by the demand levels during the peak period. The analysis included the effects of increased frequency and increased vehicle size on environmental impacts, while environmental economies of vehicle size were also taken into account. The main conclusion is that the marginal environmental burden during the peak hours is much higher than is usually thought, whereas it is almost zero during the off-peak period. This implies a pattern that is the precise opposite of the average environmental burden. Thus, an analysis of environmental effects of public transport based on average performance would yield misleading conclusions [nl

  3. Survey of Models on Demand, Customer Base-Line and Demand Response and Their Relationships in the Power Market

    OpenAIRE

    Heshmati, Almas

    2012-01-01

    The increasing use of demand-side management as a tool to reliably meet electricity demand at peak time has stimulated interest among researchers, consumers and producer organizations, managers, regulators and policymakers, This research reviews the growing literature on models used to study demand, consumer baseline (CBL) and demand response in the electricity market. After characterizing the general demand models, it reviews consumer baseline based on which further study the demand response...

  4. The evaluation of team lifting on physical work demands and workload in ironworkers.

    Science.gov (United States)

    van der Molen, Henk F; Visser, Steven; Kuijer, P Paul F M; Faber, Gert; Hoozemans, Marco J M; van Dieën, Jaap H; Frings-Dresen, Monique H W

    2012-01-01

    Lifting and carrying heavy loads occur frequently among ironworkers and result in high prevalence and incidence rates of low back complaints, injuries and work-disability. From a health perspective, little information is available on the effect of team lifting on work demands and workload. Therefore, the objective of this study was to compare the effects of team lifting of maximally 50 kg by two ironworkers (T50) with team lifting of maximally 100 kg by four ironworkers (T100). This study combined a field and laboratory study with the following outcome measures: duration and frequency of tasks and activities, energetic workload, perceived discomfort and maximal compression forces (Fc peak) on the low back. The physical work demands and workload of an individual iron worker during manual handling of rebar materials of 100 kg with four workers did not differ from the manual handling of rebar materials of 50 kg with two workers, with the exception of low back discomfort and Fc peak. The biomechanical workload of the low back exceeded for both T50 and T100 the NIOSH threshold limit of 3400N. Therefore, mechanical transport or other effective design solutions should be considered to reduce the biomechanical workload of the low back and the accompanying health risks among iron workers.

  5. PEAKS: Computer code for solving partly overlapped photopeak in gamma spectrometry

    International Nuclear Information System (INIS)

    Jerez Vergueria, Sergio; Jerez Vergueria, Pablo

    1996-01-01

    The paper describes the main elements of the code according to purposes and contents. The PEAKS code is a useful tool of comfortable and easy handling for solving, partly overlapped photopeak in gamma spectrometry with NaI(Ti) detector

  6. Remote handling in ZEPHYR

    International Nuclear Information System (INIS)

    Andelfinger, C.; Lackner, E.; Ulrich, M.; Weber, G.; Schilling, H.B.

    1982-04-01

    A conceptual design of the ZEPHYR building is described. The listed radiation data show that remote handling devices will be necessary in most areas of the building. For difficult repair and maintenance works it is intended to transfer complete units from the experimental hall to a hot cell which provides better working conditions. The necessary crane systems and other transport means are summarized as well as suitable commercially available manipulators and observation devices. The conept of automatic devices for cutting and welding and other operations inside the vacuum vessel and the belonging position control system is sketched. Guidelines for the design of passive components are set up in order to facilitate remote operation. (orig.)

  7. Handling hunger strikers.

    Science.gov (United States)

    1992-04-01

    Hunger strikes are being used increasingly and not only by those with a political point to make. Whereas in the past, hunger strikes in the United Kingdom seemed mainly to be started by terrorist prisoners for political purposes, the most recent was begun by a Tamil convicted of murder, to protest his innocence. In the later stages of his strike, before calling it off, he was looked after at the Hammersmith Hospital. So it is not only prison doctors who need to know how to handle a hunger strike. The following guidelines, adopted by the 43rd World Medical Assembly in Malta in November 1991, are therefore a timely reminder of the doctor's duties during a hunger strike.

  8. MFTF exception handling system

    International Nuclear Information System (INIS)

    Nowell, D.M.; Bridgeman, G.D.

    1979-01-01

    In the design of large experimental control systems, a major concern is ensuring that operators are quickly alerted to emergency or other exceptional conditions and that they are provided with sufficient information to respond adequately. This paper describes how the MFTF exception handling system satisfies these requirements. Conceptually exceptions are divided into one of two classes. Those which affect command status by producing an abort or suspend condition and those which fall into a softer notification category of report only or operator acknowledgement requirement. Additionally, an operator may choose to accept an exception condition as operational, or turn off monitoring for sensors determined to be malfunctioning. Control panels and displays used in operator response to exceptions are described

  9. Plutonium safe handling

    International Nuclear Information System (INIS)

    Tvehlov, Yu.

    2000-01-01

    The abstract, prepared on the basis of materials of the IAEA new leadership on the plutonium safe handling and its storage (the publication no. 9 in the Safety Reports Series), aimed at presenting internationally acknowledged criteria on the radiation danger evaluation and summarizing the experience in the safe management of great quantities of plutonium, accumulated in the nuclear states, is presented. The data on the weapon-class and civil plutonium, the degree of its danger, the measures for provision of its safety, including the data on accident radiation consequences with the fission number 10 18 , are presented. The recommendations, making it possible to eliminate the super- criticality danger, as well as ignition and explosion, to maintain the tightness of the facility, aimed at excluding the radioactive contamination and the possibility of internal irradiation, to provide for the plutonium security, physical protection and to reduce irradiation are given [ru

  10. Handle with care

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-03-15

    Full text: A film dealing with transport of radioactive materials by everyday means - rail, road, sea and air transport - has been made for IAEA. It illustrates in broad terms some of the simple precautions which should be followed by persons dealing with such materials during shipment. Throughout, the picture stresses the transport regulations drawn up and recommended by the Agency, and in particular the need to carry out carefully the instructions based on these regulations in order to ensure that there is no hazard to the public nor to those who handle radioactive materials in transit and storage. In straightforward language, the film addresses the porter of a goods wagon, an airline cargo clerk, a dockside crane operator, a truck driver and others who load and ship freight. It shows the various types of package used to contain different categories of radioactive substances according to the intensity of the radiation emitted. It also illustrates their robustness by a series of tests involving drops, fires, impact, crushing, etc. Clear instructions are conveyed on what to do in the event of an unlikely accident with any type of package. The film is entitled, 'The Safe Transport of Radioactive Materials', and is No. 3 in the series entitled, 'Handle with Care'. It was made for IAEA through the United Kingdom Atomic Energy Authority by the Film Producers' Guild in the United Kingdom. It is in 16 mm colour, optical sound, with a running time of 20 minutes. It is available for order at $50 either direct from IAEA or through any of its Member Governments. Prints can be supplied in English, French, Russian or Spanish. Copies are also available for adaptation for commentaries in other languages. (author)

  11. A Novel Technique to Enhance Demand Responsiveness

    DEFF Research Database (Denmark)

    Farashbashi-Astaneh, Seyed-Mostafa; Bhattarai, Bishnu Prasad; Bak-Jensen, Birgitte

    2015-01-01

    In this study, a new pricing approach is proposed to increase demand responsiveness. The proposed approach considers two well-known demand side management techniques, namely peak shaving and valley filling. This is done by incentivising consumers by magnifying price difference between peak and off......-peak hours. The usefulness of the suggested method is then investigated by its combination with an electric vehicle optimal scheduling methodology which captures both economic valuation and grid technical constraints. This case is chosen in this study to address network congestion issues, namely under...

  12. System dynamics model of Hubbert Peak for China's oil

    International Nuclear Information System (INIS)

    Tao Zaipu; Li Mingyu

    2007-01-01

    American geophysicist M. King Hubbert in 1956 first introduced a logistic equation to estimate the peak and lifetime production for oil of USA. Since then, a fierce debate ensued on the so-called Hubbert Peak, including also its methodology. This paper proposes to use the generic STELLA model to simulate Hubbert Peak, particularly for the Chinese oil production. This model is demonstrated as being robust. We used three scenarios to estimate the Chinese oil peak: according to scenario 1 of this model, the Hubbert Peak for China's crude oil production appears to be in 2019 with a value of 199.5 million tonnes, which is about 1.1 times the 2005 output. Before the peak comes, Chinese oil output will grow by about 1-2% annually, after the peak, however, the output will fall. By 2040, the annual production of Chinese crude oil would be equivalent to the level of 1990. During the coming 20 years, the crude oil demand of China will probably grow at the rate of 2-3% annually, and the gap between domestic supply and total demand may be more than half of this demand

  13. Demand for electrical energy

    International Nuclear Information System (INIS)

    Bergougnoux, J.; Fouquet, D.

    1983-01-01

    The different utilizations of electric energy are reviewed in the residential and tertiary sectors, in the industry. The competitive position of electricity in regard to other fuels has been strengthned by the sudden rise in the price of oil in 1973-1974 and 1979-1980. The evolution of electricity prices depended on the steps taken to adjust the electricity generation system. The substitution of electricity applications for hydro-carbons is an essential point of energy policy. The adjustment at all times, at least cost and most reliability, of the supply of electricity to the demand for it is a major problem in the design and operation of electric systems. National demand for power at a given moment is extremely diversified. Electricity consumption presents daily and seasonal variations, and variations according to the different sectors. Forecasting power requirements is for any decision on operation or investment relating to an electrical system. Load management is desirable (prices according to the customers, optional tariffs for ''peak-day withdrawal''). To conclude, prospects for increased electricity consumption are discussed [fr

  14. Psychopathology and tobacco demand.

    Science.gov (United States)

    Farris, Samantha G; Aston, Elizabeth R; Zvolensky, Michael J; Abrantes, Ana M; Metrik, Jane

    2017-08-01

    Behavioral economic measurement of the relative value of tobacco (Cigarette Purchase Task; CPT) is used to examine individual differences in motivation for tobacco under certain contexts. Smokers with psychopathology, relative to those without, may demonstrate stronger demand for tobacco following a period of smoking deprivation, which could account for disparate rates of smoking and cessation among this subgroup. Participants (n=111) were community-recruited adult daily smokers who completed the CPT after a deprivation period of approximately 60min. Presence of psychopathology was assessed via clinical interview; 40.5% (n=45) of the sample met criteria for past-year psychological diagnosis. Specifically, 31.5% (n=35) had an emotional disorder (anxiety/depressive disorder), 17.1% (n=19) had a substance use disorder, and 19.1% of the sample had more than one disorder. Smokers with any psychopathology showed significantly higher intensity (demand at unrestricted cost; $0) and O max (peak expenditure for a drug) relative to smokers with no psychopathology. Intensity was significantly higher among smokers with an emotional disorder compared to those without. Smokers with a substance use disorder showed significantly higher intensity and O max , and lower elasticity, reflecting greater insensitivity to price increases. Having≥2 disorders was associated with higher intensity relative to having 1 or no disorders. Findings suggest that presence of psychopathology may be associated with greater and more persistent motivation to smoke. Future work is needed to explore the mechanism linking psychopathology to tobacco demand. Copyright © 2017 Elsevier B.V. All rights reserved.

  15. Hot Laboratories and Remote Handling

    International Nuclear Information System (INIS)

    Bart, G.; Blanc, J.Y.; Duwe, R.

    2003-01-01

    The European Working Group on ' Hot Laboratories and Remote Handling' is firmly established as the major contact forum for the nuclear R and D facilities at the European scale. The yearly plenary meetings intend to: - Exchange experience on analytical methods, their implementation in hot cells, the methodologies used and their application in nuclear research; - Share experience on common infrastructure exploitation matters such as remote handling techniques, safety features, QA-certification, waste handling; - Promote normalization and co-operation, e.g., by looking at mutual complementarities; - Prospect present and future demands from the nuclear industry and to draw strategic conclusions regarding further needs. The 41. plenary meeting was held in CEA Saclay from September 22 to 24, 2003 in the premises and with the technical support of the INSTN (National Institute for Nuclear Science and Technology). The Nuclear Energy Division of CEA sponsored it. The Saclay meeting was divided in three topical oral sessions covering: - Post irradiation examination: new analysis methods and methodologies, small specimen technology, programmes and results; - Hot laboratory infrastructure: decommissioning, refurbishment, waste, safety, nuclear transports; - Prospective research on materials for future applications: innovative fuels (Generation IV, HTR, transmutation, ADS), spallation source materials, and candidate materials for fusion reactor. A poster session was opened to transport companies and laboratory suppliers. The meeting addressed in three sessions the following items: Session 1 - Post Irradiation Examinations. Out of 12 papers (including 1 poster) 7 dealt with surface and solid state micro analysis, another one with an equally complex wet chemical instrumental analytical technique, while the other four papers (including the poster) presented new concepts for digital x-ray image analysis; Session 2 - Hot laboratory infrastructure (including waste theme) which was

  16. Introducing a demand-based electricity distribution tariff in the residential sector: Demand response and customer perception

    International Nuclear Information System (INIS)

    Bartusch, Cajsa; Wallin, Fredrik; Odlare, Monica; Vassileva, Iana; Wester, Lars

    2011-01-01

    Increased demand response is essential to fully exploit the Swedish power system, which in turn is an absolute prerequisite for meeting political goals related to energy efficiency and climate change. Demand response programs are, nonetheless, still exceptional in the residential sector of the Swedish electricity market, one contributory factor being lack of knowledge about the extent of the potential gains. In light of these circumstances, this empirical study set out with the intention of estimating the scope of households' response to, and assessing customers' perception of, a demand-based time-of-use electricity distribution tariff. The results show that households as a whole have a fairly high opinion of the demand-based tariff and act on its intrinsic price signals by decreasing peak demand in peak periods and shifting electricity use from peak to off-peak periods. - Highlights: → Households are sympathetic to demand-based tariffs, seeing as they relate to environmental issues. → Households adjust their electricity use to the price signals of demand-based tariffs. → Demand-based tariffs lead to a shift in electricity use from peak to off-peak hours. → Demand-based tariffs lead to a decrease in maximum demand in peak periods. → Magnitude of these effects increases over time.

  17. Unvented Drum Handling Plan

    International Nuclear Information System (INIS)

    MCDONALD, K.M.

    2000-01-01

    This drum-handling plan proposes a method to deal with unvented transuranic drums encountered during retrieval of drums. Finding unvented drums during retrieval activities was expected, as identified in the Transuranic (TRU) Phase I Retrieval Plan (HNF-4781). However, significant numbers of unvented drums were not expected until excavation of buried drums began. This plan represents accelerated planning for management of unvented drums. A plan is proposed that manages unvented drums differently based on three categories. The first category of drums is any that visually appear to be pressurized. These will be vented immediately, using either the Hanford Fire Department Hazardous Materials (Haz. Mat.) team, if such are encountered before the facilities' capabilities are established, or using internal capabilities, once established. To date, no drums have been retrieved that showed signs of pressurization. The second category consists of drums that contain a minimal amount of Pu isotopes. This minimal amount is typically less than 1 gram of Pu, but may be waste-stream dependent. Drums in this category are assayed to determine if they are low-level waste (LLW). LLW drums are typically disposed of without venting. Any unvented drums that assay as TRU will be staged for a future venting campaign, using appropriate safety precautions in their handling. The third category of drums is those for which records show larger amounts of Pu isotopes (typically greater than or equal to 1 gram of Pu). These are assumed to be TRU and are not assayed at this point, but are staged for a future venting campaign. Any of these drums that do not have a visible venting device will be staged awaiting venting, and will be managed under appropriate controls, including covering the drums to protect from direct solar exposure, minimizing of container movement, and placement of a barrier to restrict vehicle access. There are a number of equipment options available to perform the venting. The

  18. New transport and handling contract

    CERN Multimedia

    SC Department

    2008-01-01

    A new transport and handling contract entered into force on 1.10.2008. As with the previous contract, the user interface is the internal transport/handling request form on EDH: https://edh.cern.ch/Document/TransportRequest/ To ensure that you receive the best possible service, we invite you to complete the various fields as accurately as possible and to include a mobile telephone number on which we can reach you. You can follow the progress of your request (schedule, completion) in the EDH request routing information. We remind you that the following deadlines apply: 48 hours for the transport of heavy goods (up to 8 tonnes) or simple handling operations 5 working days for crane operations, transport of extra-heavy goods, complex handling operations and combined transport and handling operations in the tunnel. For all enquiries, the number to contact remains unchanged: 72202. Heavy Handling Section TS-HE-HH 72672 - 160319

  19. Remote handling and accelerators

    International Nuclear Information System (INIS)

    Wilson, M.T.

    1983-01-01

    The high-current levels of contemporary and proposed accelerator facilities induce radiation levels into components, requiring consideration be given to maintenance techniques that reduce personnel exposure. Typical components involved include beamstops, targets, collimators, windows, and instrumentation that intercepts the direct beam. Also included are beam extraction, injection, splitting, and kicking regions, as well as purposeful spill areas where beam tails are trimmed and neutral particles are deposited. Scattered beam and secondary particles activate components all along a beamline such as vacuum pipes, magnets, and shielding. Maintenance techniques vary from hands-on to TV-viewed operation using state-of-the-art servomanipulators. Bottom- or side-entry casks are used with thimble-type target and diagnostic assemblies. Long-handled tools are operated from behind shadow shields. Swinging shield doors, unstacking block, and horizontally rolling shield roofs are all used to provide access. Common to all techniques is the need to make operations simple and to provide a means of seeing and reaching the area

  20. TFTR tritium handling concepts

    International Nuclear Information System (INIS)

    Garber, H.J.

    1976-01-01

    The Tokamak Fusion Test Reactor, to be located on the Princeton Forrestal Campus, is expected to operate with 1 to 2.5 MA tritium--deuterium plasmas, with the pulses involving injection of 50 to 150 Ci (5 to 16 mg) of tritium. Attainment of fusion conditions is based on generation of an approximately 1 keV tritium plasma by ohmic heating and conversion to a moderately hot tritium--deuterium ion plasma by injection of a ''preheating'' deuterium neutral beam (40 to 80 keV), followed by injection of a ''reacting'' beam of high energy neutral deuterium (120 to 150 keV). Additionally, compressions accompany the beam injections. Environmental, safety and cost considerations led to the decision to limit the amount of tritium gas on-site to that required for an experiment, maintaining all other tritium in ''solidified'' form. The form of the tritium supply is as uranium tritide, while the spent tritium and other hydrogen isotopes are getter-trapped by zirconium--aluminum alloy. The issues treated include: (1) design concepts for the tritium generator and its purification, dispensing, replenishment, containment, and containment--cleanup systems; (2) features of the spent plasma trapping system, particularly the regenerable absorption cartridges, their integration into the vacuum system, and the handling of non-getterables; (3) tritium permeation through the equipment and the anticipated releases to the environment; (4) overview of the tritium related ventilation systems; and (5) design bases for the facility's tritium clean-up systems

  1. Safe Handling of Radioisotopes

    International Nuclear Information System (INIS)

    1958-01-01

    Under its Statute the International Atomic Energy Agency is empowered to provide for the application of standards of safety for protection against radiation to its own operations and to operations making use of assistance provided by it or with which it is otherwise directly associated. To this end authorities receiving such assistance are required to observe relevant health and safety measures prescribed by the Agency. As a first step, it has been considered an urgent task to provide users of radioisotopes with a manual of practice for the safe handling of these substances. Such a manual is presented here and represents the first of a series of manuals and codes to be issued by the Agency. It has been prepared after careful consideration of existing national and international codes of radiation safety, by a group of international experts and in consultation with other international bodies. At the same time it is recommended that the manual be taken into account as a basic reference document by Member States of the Agency in the preparation of national health and safety documents covering the use of radioisotopes.

  2. Radioactive wastes handling facility

    International Nuclear Information System (INIS)

    Hirose, Emiko; Inaguma, Masahiko; Ozaki, Shigeru; Matsumoto, Kaname.

    1997-01-01

    There are disposed an area where a conveyor is disposed for separating miscellaneous radioactive solid wastes such as metals, on area for operators which is disposed in the direction vertical to the transferring direction of the conveyor, an area for receiving the radioactive wastes and placing them on the conveyor and an area for collecting the radioactive wastes transferred by the conveyor. Since an operator can conduct handling while wearing a working cloth attached to a partition wall as he wears his ordinary cloth, the operation condition can be improved and the efficiency for the separating work can be improved. When the area for settling conveyors and the area for the operators is depressurized, cruds on the surface of the wastes are not released to the outside and the working clothes can be prevented from being involved. Since the wastes are transferred by the conveyor, the operator's moving range is reduced, poisonous materials are fallen and moved through a sliding way to an area for collecting materials to be separated. Accordingly, the materials to be removed can be accumulated easily. (N.H.)

  3. Trends in Modern Exception Handling

    Directory of Open Access Journals (Sweden)

    Marcin Kuta

    2003-01-01

    Full Text Available Exception handling is nowadays a necessary component of error proof information systems. The paper presents overview of techniques and models of exception handling, problems connected with them and potential solutions. The aspects of implementation of propagation mechanisms and exception handling, their effect on semantics and general program efficiency are also taken into account. Presented mechanisms were adopted to modern programming languages. Considering design area, formal methods and formal verification of program properties we can notice exception handling mechanisms are weakly present what makes a field for future research.

  4. Peak-load management, the security of supply warranty

    International Nuclear Information System (INIS)

    2010-01-01

    Even if France owns an efficient power generation park, largely exporting and clean (90% with no CO 2 emission), it encounters some difficulties during peak-load periods. The successive peak power demand records which are recorded each year represent as many alerts about a possible collapse of the power system. In order to warrant the electricity supply, the present day regulatory framework must be changed to allow the industrial players to carry out the necessary investments

  5. Climate change and energy demand

    International Nuclear Information System (INIS)

    Hengeveld, H.G.

    1991-01-01

    Climate and weather events affect energy demand in most economic sectors. Linear relationships exist between consumption and heating degree days, and peak electricity demand increases significantly during heat waves. The relative magnitudes of demand changes for a two times carbon dioxide concentration scenario are tabulated, illustrating heating degree days and cooling degree days for 5 Prairie locations. Irrigation, water management, crop seeding and harvesting and weed control are examples of climate-dependent agricultural activities involving significant energy use. The variability of summer season liquid fuel use in the agricultural sector in the Prairie provinces from 1984-1989 shows a relationship between agricultural energy use and regional climate fluctuations. 4 refs., 2 figs., 1 tab

  6. Analysis of energy demand-supply of city and evaluation of energy conservation and peak suppression of environmental symbiosis city; Toshi no energy jukyu bunseki to shoene toshi no shoene fuka heijunka koka no hyoka (kankyo kyosei sho energy wo mezashita 60 mannin shintoshi ni tsuite no kento)

    Energy Technology Data Exchange (ETDEWEB)

    Iwatsubo, T.; Hashimoto, K. [Central Research Institute of Electric Power Industry, Tokyo (Japan)

    1997-05-01

    The paper developed an analysis method of the energy supply/demand structure of city and compared the conventional city and a city considering energy conservation. An energy supply/demand flow chart was newly proposed. From this flow chart, `energy sustainability ratios` was proposed as a new index for comprehensively evaluating two elements of the energy conservation by load reduction and heightening of energy conversion rates and the utilization of waste heat and renewable energy. A method for analysis of the energy supply/demand structure of city was developed including daily supply/demand patterns in the area where individual equipment in every residence/building correspond to the energy supply and the area where centralized energy systems such as district energy supply correspond it. From the developed analysis method, analysis was made of a newly developed city with a 0.6 million population in terms of the conventional city and energy conservation city, to clarify the present energy supply/demand structure of city and to express it in an energy flow chart. At the same time, validity of the analysis method and evaluation indexes were confirmed by comparing the conventional city and energy conservation city. 15 refs, 27 figs., 17 tabs.

  7. Safety measuring for sodium handling

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Ji Young; Jeong, K C; Kim, T J; Kim, B H; Choi, J H

    2001-09-01

    This is the report for the safety measures of sodium handling. These contents are prerequisites for the development of sodium technology and thus the workers participate in sodium handling and experiments have to know them perfectly. As an appendix, the relating parts of the laws are presented.

  8. Waste Handling Building Conceptual Study

    International Nuclear Information System (INIS)

    G.W. Rowe

    2000-01-01

    The objective of the ''Waste Handling Building Conceptual Study'' is to develop proposed design requirements for the repository Waste Handling System in sufficient detail to allow the surface facility design to proceed to the License Application effort if the proposed requirements are approved by DOE. Proposed requirements were developed to further refine waste handling facility performance characteristics and design constraints with an emphasis on supporting modular construction, minimizing fuel inventory, and optimizing facility maintainability and dry handling operations. To meet this objective, this study attempts to provide an alternative design to the Site Recommendation design that is flexible, simple, reliable, and can be constructed in phases. The design concept will be input to the ''Modular Design/Construction and Operation Options Report'', which will address the overall program objectives and direction, including options and issues associated with transportation, the subsurface facility, and Total System Life Cycle Cost. This study (herein) is limited to the Waste Handling System and associated fuel staging system

  9. National energy peak leveling program (NEPLP). Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    This three-volume report is responsive to the requirements of Contract E (04-3)-1152 to provide a detailed methodology, to include management, technology, and socio-economic aspects, of a voluntary community program of computer-assisted peak load leveling and energy conservation in commercial community facilities. The demonstration project established proof-of-concept in reducing the kW-demand peak by the unofficial goal of 10%, with concurrent kWh savings. This section of the three volume report is a final report appendix with information on the National Energy Peak Leveling Program (NEPLP).

  10. Sensitivity analysis of energy demands on performance of CCHP system

    International Nuclear Information System (INIS)

    Li, C.Z.; Shi, Y.M.; Huang, X.H.

    2008-01-01

    Sensitivity analysis of energy demands is carried out in this paper to study their influence on performance of CCHP system. Energy demand is a very important and complex factor in the optimization model of CCHP system. Average, uncertainty and historical peaks are adopted to describe energy demands. The mix-integer nonlinear programming model (MINLP) which can reflect the three aspects of energy demands is established. Numerical studies are carried out based on energy demands of a hotel and a hospital. The influence of average, uncertainty and peaks of energy demands on optimal facility scheme and economic advantages of CCHP system are investigated. The optimization results show that the optimal GT's capacity and economy of CCHP system mainly lie on the average energy demands. Sum of capacities of GB and HE is equal to historical heating demand peaks, and sum of capacities of AR and ER are equal to historical cooling demand peaks. Maximum of PG is sensitive with historical peaks of energy demands and not influenced by uncertainty of energy demands, while the corresponding influence on DH is adverse

  11. Generation Mix Study Focusing on Nuclear Power by Practical Peak Forecast

    International Nuclear Information System (INIS)

    Shin, Jung Ho; Roh, Myung Sub

    2013-01-01

    The excessive underestimation can lead to a range of problem; expansion of LNG plant requiring short construction period, the following increase of electricity price, low reserve margin and inefficient configuration of power source. With regard to nuclear power, the share of the stable and economic base load plant, nuclear power, can reduce under the optimum level. Amongst varied factors which contribute to the underestimate, immoderate target for demand side management (DSM) including double deduction of the constraint amount by DSM from peak demand forecast is one of the causes. The hypothesis in this study is that the better optimum generation mix including the adequate share of nuclear power can be obtained under the condition of the peak demand forecast without deduction of DSM target because this forecast is closer to the actual peak demand. In this study, the hypothesis is verified with comparison between peak demand forecast before (or after) DSM target application and the actual peak demand in the 3 rd through 5 th BPE from 2006 to 2010. Furthermore, this research compares and analyzes several generation mix in 2027 focusing on the nuclear power by a few conditions using the WASP-IV program on the basis of the 6 th BPE in 2013. According to the comparative analysis on the peak demand forecast and actual peak demand from 2006 to 2010, the peak demand forecasts without the deduction of the DSM target is closer to the actual peak demand than the peak demand forecasts considering the DSM target in the 3 th , 4 th , 5 th entirely. In addition, the generation mix until 2027 is examined by the WASP-IV. As a result of the program run, when considering the peak demand forecast without DSM reflection, since the base load plants including nuclear power take up adequate proportion, stable and economic supply of electricity can be achieved. On the contrary, in case of planning based on the peak demand forecast with DSM reflected and then compensating the shortage by

  12. Generation Mix Study Focusing on Nuclear Power by Practical Peak Forecast

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Jung Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    The excessive underestimation can lead to a range of problem; expansion of LNG plant requiring short construction period, the following increase of electricity price, low reserve margin and inefficient configuration of power source. With regard to nuclear power, the share of the stable and economic base load plant, nuclear power, can reduce under the optimum level. Amongst varied factors which contribute to the underestimate, immoderate target for demand side management (DSM) including double deduction of the constraint amount by DSM from peak demand forecast is one of the causes. The hypothesis in this study is that the better optimum generation mix including the adequate share of nuclear power can be obtained under the condition of the peak demand forecast without deduction of DSM target because this forecast is closer to the actual peak demand. In this study, the hypothesis is verified with comparison between peak demand forecast before (or after) DSM target application and the actual peak demand in the 3{sup rd} through 5{sup th} BPE from 2006 to 2010. Furthermore, this research compares and analyzes several generation mix in 2027 focusing on the nuclear power by a few conditions using the WASP-IV program on the basis of the 6{sup th} BPE in 2013. According to the comparative analysis on the peak demand forecast and actual peak demand from 2006 to 2010, the peak demand forecasts without the deduction of the DSM target is closer to the actual peak demand than the peak demand forecasts considering the DSM target in the 3{sup th}, 4{sup th}, 5{sup th} entirely. In addition, the generation mix until 2027 is examined by the WASP-IV. As a result of the program run, when considering the peak demand forecast without DSM reflection, since the base load plants including nuclear power take up adequate proportion, stable and economic supply of electricity can be achieved. On the contrary, in case of planning based on the peak demand forecast with DSM reflected and then

  13. Upper limit of peak area

    International Nuclear Information System (INIS)

    Helene, O.A.M.

    1982-08-01

    The determination of the upper limit of peak area in a multi-channel spectra, with a known significance level is discussed. This problem is specially important when the peak area is masked by the background statistical fluctuations. The problem is exactly solved and, thus, the results are valid in experiments with small number of events. The results are submitted to a Monte Carlo test and applied to the 92 Nb beta decay. (Author) [pt

  14. Impact of Smart Grid Technologies on Peak Load to 2050

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The IEA's Smart Grids Technology Roadmap identified five global trends that could be effectively addressed by deploying smart grids. These are: increasing peak load (the maximum power that the grid delivers during peak hours), rising electricity consumption, electrification of transport, deployment of variable generation technologies (e.g. wind and solar PV) and ageing infrastructure. Along with this roadmap, a new working paper -- Impact of Smart Grid Technologies on Peak Load to 2050 -- develops a methodology to estimate the evolution of peak load until 2050. It also analyses the impact of smart grid technologies in reducing peak load for four key regions; OECD North America, OECD Europe, OECD Pacific and China. This working paper is a first IEA effort in an evolving modelling process of smart grids that is considering demand response in residential and commercial sectors as well as the integration of electric vehicles.

  15. Automated Critical Peak Pricing Field Tests: Program Descriptionand Results

    Energy Technology Data Exchange (ETDEWEB)

    Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Xu, Peng

    2006-04-06

    California utilities have been exploring the use of critical peak prices (CPP) to help reduce needle peaks in customer end-use loads. CPP is a form of price-responsive demand response (DR). Recent experience has shown that customers have limited knowledge of how to operate their facilities in order to reduce their electricity costs under CPP (Quantum 2004). While the lack of knowledge about how to develop and implement DR control strategies is a barrier to participation in DR programs like CPP, another barrier is the lack of automation of DR systems. During 2003 and 2004, the PIER Demand Response Research Center (DRRC) conducted a series of tests of fully automated electric demand response (Auto-DR) at 18 facilities. Overall, the average of the site-specific average coincident demand reductions was 8% from a variety of building types and facilities. Many electricity customers have suggested that automation will help them institutionalize their electric demand savings and improve their overall response and DR repeatability. This report focuses on and discusses the specific results of the Automated Critical Peak Pricing (Auto-CPP, a specific type of Auto-DR) tests that took place during 2005, which build on the automated demand response (Auto-DR) research conducted through PIER and the DRRC in 2003 and 2004. The long-term goal of this project is to understand the technical opportunities of automating demand response and to remove technical and market impediments to large-scale implementation of automated demand response (Auto-DR) in buildings and industry. A second goal of this research is to understand and identify best practices for DR strategies and opportunities. The specific objectives of the Automated Critical Peak Pricing test were as follows: (1) Demonstrate how an automated notification system for critical peak pricing can be used in large commercial facilities for demand response (DR). (2) Evaluate effectiveness of such a system. (3) Determine how customers

  16. Estimating demand for alternatives to cigarettes with online purchase tasks.

    Science.gov (United States)

    O'Connor, Richard J; June, Kristie M; Bansal-Travers, Maansi; Rousu, Matthew C; Thrasher, James F; Hyland, Andrew; Cummings, K Michael

    2014-01-01

    To explore how advertising affects demand for cigarettes and potential substitutes, including snus, dissolvable tobacco, and medicinal nicotine. A Web-based experiment randomized 1062 smokers to see advertisements for alternative nicotine products or soft drinks, then complete a series of purchase tasks, which were used to estimate demand elasticity, peak consumption, and cross-price elasticity (CPE) for tobacco products. Lower demand elasticity and greater peak consumption were seen for cigarettes compared to all alternative products (p demand. These findings suggest significantly lower demand for alternative nicotine sources among smokers than previously revealed.

  17. Peak Oil and other threatening peaks-Chimeras without substance

    International Nuclear Information System (INIS)

    Radetzki, Marian

    2010-01-01

    The Peak Oil movement has widely spread its message about an impending peak in global oil production, caused by an inadequate resource base. On closer scrutiny, the underlying analysis is inconsistent, void of a theoretical foundation and without support in empirical observations. Global oil resources are huge and expanding, and pose no threat to continuing output growth within an extended time horizon. In contrast, temporary or prolonged supply crunches are indeed plausible, even likely, on account of growing resource nationalism denying access to efficient exploitation of the existing resource wealth.

  18. Electricity Portfolio Management: Optimal Peak / Off-Peak Allocations

    OpenAIRE

    Huisman, Ronald; Mahieu, Ronald; Schlichter, Felix

    2007-01-01

    textabstractElectricity purchasers manage a portfolio of contracts in order to purchase the expected future electricity consumption profile of a company or a pool of clients. This paper proposes a mean-variance framework to address the concept of structuring the portfolio and focuses on how to allocate optimal positions in peak and off-peak forward contracts. It is shown that the optimal allocations are based on the difference in risk premiums per unit of day-ahead risk as a measure of relati...

  19. Ultrasonic Transducer Peak-to-Peak Optical Measurement

    Directory of Open Access Journals (Sweden)

    Pavel Skarvada

    2012-01-01

    Full Text Available Possible optical setups for measurement of the peak-to-peak value of an ultrasonic transducer are described in this work. The Michelson interferometer with the calibrated nanopositioner in reference path and laser Doppler vibrometer were used for the basic measurement of vibration displacement. Langevin type of ultrasonic transducer is used for the purposes of Electro-Ultrasonic Nonlinear Spectroscopy (EUNS. Parameters of produced mechanical vibration have to been well known for EUNS. Moreover, a monitoring of mechanical vibration frequency shift with a mass load and sample-transducer coupling is important for EUNS measurement.

  20. A Cybernetic Approach to Assess the Longitudinal Handling Qualities of Aeroelastic Aircraft

    NARCIS (Netherlands)

    Damveld, H.J.

    2009-01-01

    The future demand for larger and lighter civil transport aircraft leads to more flexible aircraft, which bring their own controlling and handling problems. A review of established handling qualities methods showed that they were either unsuitable for aeroelastic aircraft, or had significant

  1. Catch Index : Development of a tool for measurement the quality of the catch handling at sea

    NARCIS (Netherlands)

    Schelvis-Smit, A.A.M.; Luten, J.B.

    2003-01-01

    Correct fish handling on board of vessels is essential for the quality of the fish throughout the complete fishery chain. Developments in the fishery sector with respect to quality control, traceability and remote trade demand a tool to access the performance of fish handling by fishermen. Therefore

  2. Robust peak-shaving for a neighborhood with electric vehicles

    NARCIS (Netherlands)

    Gerards, Marco Egbertus Theodorus; Hurink, Johann L.

    2016-01-01

    Demand Side Management (DSM) is a popular approach for grid-aware peak-shaving. The most commonly used DSM methods either have no look ahead feature and risk deploying flexibility too early, or they plan ahead using predictions, which are in general not very reliable. To counter this, a DSM approach

  3. Sophisticated fuel handling system evolved

    International Nuclear Information System (INIS)

    Ross, D.A.

    1988-01-01

    The control systems at Sellafield fuel handling plant are described. The requirements called for built-in diagnostic features as well as the ability to handle a large sequencing application. Speed was also important; responses better than 50ms were required. The control systems are used to automate operations within each of the three main process caves - two Magnox fuel decanners and an advanced gas-cooled reactor fuel dismantler. The fuel route within the fuel handling plant is illustrated and described. ASPIC (Automated Sequence Package for Industrial Control) which was developed as a controller for the plant processes is described. (U.K.)

  4. Production management of window handles

    Directory of Open Access Journals (Sweden)

    Manuela Ingaldi

    2014-12-01

    Full Text Available In the chapter a company involved in the production of aluminum window and door handles was presented. The main customers of the company are primarily companies which produce PCV joinery and wholesalers supplying these companies. One chosen product from the research company - a single-arm pin-lift window handle - was described and its production process depicted technologically. The chapter also includes SWOT analysis conducted in the research company and the value stream of the single-arm pin-lift window handle.

  5. Exploring Demand Charge Savings from Commercial Solar

    Energy Technology Data Exchange (ETDEWEB)

    Darghouth, Naim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mills, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Gagnon, Pieter [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bird, Lori [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-07-31

    Commercial retail electricity rates commonly include a demand charge component, based on some measure of the customer’s peak demand. Customer-sited solar PV can potentially reduce demand charges, but the magnitude of these savings can be difficult to predict, given variations in demand charge designs, customer loads, and PV generation profiles. Moreover, depending on the circumstances, demand charges from solar may or may not align well with associated utility cost savings. Lawrence Berkeley National Laboratory (Berkeley Lab) and the National Renewable Energy Laboratory (NREL) are collaborating in a series of studies to understand how solar PV can reduce demand charge levels for a variety of customer types and demand charges designs. Previous work focused on residential customs with solar. This study, instead, focuses on commercial customers and seeks to understand the extent and conditions under which rooftop can solar reduce commercial demand charges. To answer these questions, we simulate demand charge savings for a broad range of commercial customer types, demand charge designs, locations, and PV system characteristics. This particular analysis does not include storage, but a subsequent analysis in this series will evaluate demand charge savings for commercial customers with solar and storage.

  6. Peaking-factor of PWR

    International Nuclear Information System (INIS)

    Morioka, Noboru; Kato, Yasuji; Yokoi, M.

    1975-01-01

    Output peaking factor often plays an important role in the safety and operation of nuclear reactors. The meaning of the peaking factor of PWRs is categorized into two features or the peaking factor in core (FQ-core) and the peaking factor on the basis of accident analysis (or FQ-limit). FQ-core is the actual peaking factor realized in nuclear core at the time of normal operation, and FQ-limit should be evaluated from loss of coolant accident and other abnormal conditions. If FQ-core is lower than FQ-limit, the reactor may be operated at full load, but if FQ-core is larger than FQ-limit, reactor output should be controlled lower than FQ-limit. FQ-core has two kinds of values, or the one on the basis of nuclear design, and the other actually measured in reactor operation. The first FQ-core should be named as FQ-core-design and the latter as FQ-core-measured. The numerical evaluation of FQ-core-design is as follows; FQ-core-design of three-dimensions is synthesized with FQ-core horizontal value (X-Y) and FQ-core vertical value, the former one is calculated with ASSY-CORE code, and the latter one with one dimensional diffusion code. For the evaluation of FQ-core-measured, on-site data observation from nuclear reactor instrumentation or off-site data observation is used. (Iwase, T.)

  7. Coordination of Energy Efficiency and Demand Response

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, Charles; Reid, Michael; Levy, Roger; Silverstein, Alison

    2010-01-29

    This paper reviews the relationship between energy efficiency and demand response and discusses approaches and barriers to coordinating energy efficiency and demand response. The paper is intended to support the 10 implementation goals of the National Action Plan for Energy Efficiency's Vision to achieve all cost-effective energy efficiency by 2025. Improving energy efficiency in our homes, businesses, schools, governments, and industries - which consume more than 70 percent of the nation's natural gas and electricity - is one of the most constructive, cost-effective ways to address the challenges of high energy prices, energy security and independence, air pollution, and global climate change. While energy efficiency is an increasingly prominent component of efforts to supply affordable, reliable, secure, and clean electric power, demand response is becoming a valuable tool in utility and regional resource plans. The Federal Energy Regulatory Commission (FERC) estimated the contribution from existing U.S. demand response resources at about 41,000 megawatts (MW), about 5.8 percent of 2008 summer peak demand (FERC, 2008). Moreover, FERC recently estimated nationwide achievable demand response potential at 138,000 MW (14 percent of peak demand) by 2019 (FERC, 2009).2 A recent Electric Power Research Institute study estimates that 'the combination of demand response and energy efficiency programs has the potential to reduce non-coincident summer peak demand by 157 GW' by 2030, or 14-20 percent below projected levels (EPRI, 2009a). This paper supports the Action Plan's effort to coordinate energy efficiency and demand response programs to maximize value to customers. For information on the full suite of policy and programmatic options for removing barriers to energy efficiency, see the Vision for 2025 and the various other Action Plan papers and guides available at www.epa.gov/eeactionplan.

  8. A Perspective on Equipment Design for Fusion Remote Handling

    International Nuclear Information System (INIS)

    Mills, S.; Haist, B.; Hamilton, D.

    2006-01-01

    For 8 years, JET remote operations have become more capable and confident. Many tasks have been successfully completed, even those never intended to be remote maintenance activities. The general approach to the provision of remote handling equipment at JET has been the preferred use of commercially-off-the-shelf equipment. In the areas of electrical, electronic, software and control this approach has been generally achievable. However, in the area of mechanical equipment it has been more difficult. In particular the RH tooling has been almost entirely bespoke as its requirements are highly sensitive to the design of the JET component being handled and there are many design variations. Hence, JET has required the design and manufacture of over 700 types of bespoke RH equipment. This paper will discuss the experience of introducing and developing remote handling mechanical equipment for JET. The paper will cover the relationship between the remote handling equipment and the JET component design and the potential for improving the design function. A major lesson from the introduction of remote handling to JET has been demonstration of the very close interdependency of the design of JET components with design of remote handling tooling. The JET remote handling manual was originally introduced as the vehicle to ensure remote handling compatibility by the introduction of standards. Experience has shown that in general the remote handling manual approach has been insufficient. Future fusion machines will be much more complex than JET and will demand even greater remote handling compatibility. This paper will discuss possible methods for improving this process. Equipment operating in a high radiation environment must be dependable It may spend part of its time in areas that would be extremely difficult to recover from in the case of failure. The equipment may also have a high duty cycle to minimise shutdown times and probably cannot be manually inspected on a frequent

  9. How to use your peak flow meter

    Science.gov (United States)

    ... meter - how to use; Asthma - peak flow meter; Reactive airway disease - peak flow meter; Bronchial asthma - peak ... 2014:chap 55. National Asthma Education and Prevention Program website. How to use a peak flow meter. ...

  10. Safe handling of radiation sources

    International Nuclear Information System (INIS)

    Abd Nasir Ibrahim; Azali Muhammad; Ab Razak Hamzah; Abd Aziz Mohamed; Mohammad Pauzi Ismail

    2004-01-01

    This chapter discussed the subjects related to the safe handling of radiation sources: type of radiation sources, method of use: transport within premises, transport outside premises; Disposal of Gamma Sources

  11. How Retailers Handle Complaint Management

    DEFF Research Database (Denmark)

    Hansen, Torben; Wilke, Ricky; Zaichkowsky, Judy

    2009-01-01

    This article fills a gap in the literature by providing insight about the handling of complaint management (CM) across a large cross section of retailers in the grocery, furniture, electronic and auto sectors. Determinants of retailers’ CM handling are investigated and insight is gained as to the......This article fills a gap in the literature by providing insight about the handling of complaint management (CM) across a large cross section of retailers in the grocery, furniture, electronic and auto sectors. Determinants of retailers’ CM handling are investigated and insight is gained...... as to the links between CM and redress of consumers’ complaints. The results suggest that retailers who attach large negative consequences to consumer dissatisfaction are more likely than other retailers to develop a positive strategic view on customer complaining, but at the same time an increase in perceived...

  12. Ergonomic material-handling device

    Science.gov (United States)

    Barsnick, Lance E.; Zalk, David M.; Perry, Catherine M.; Biggs, Terry; Tageson, Robert E.

    2004-08-24

    A hand-held ergonomic material-handling device capable of moving heavy objects, such as large waste containers and other large objects requiring mechanical assistance. The ergonomic material-handling device can be used with neutral postures of the back, shoulders, wrists and knees, thereby reducing potential injury to the user. The device involves two key features: 1) gives the user the ability to adjust the height of the handles of the device to ergonomically fit the needs of the user's back, wrists and shoulders; and 2) has a rounded handlebar shape, as well as the size and configuration of the handles which keep the user's wrists in a neutral posture during manipulation of the device.

  13. Peak Electric Load Relief in Northern Manhattan

    Directory of Open Access Journals (Sweden)

    Hildegaard D. Link

    2014-08-01

    Full Text Available The aphorism “Think globally, act locally,” attributed to René Dubos, reflects the vision that the solution to global environmental problems must begin with efforts within our communities. PlaNYC 2030, the New York City sustainability plan, is the starting point for this study. Results include (a a case study based on the City College of New York (CCNY energy audit, in which we model the impacts of green roofs on campus energy demand and (b a case study of energy use at the neighborhood scale. We find that reducing the urban heat island effect can reduce building cooling requirements, peak electricity loads stress on the local electricity grid and improve urban livability.

  14. The technique on handling radiation

    International Nuclear Information System (INIS)

    1997-11-01

    This book describes measurement of radiation and handling radiation. The first part deals with measurement of radiation. The contents of this part are characteristic on measurement technique of radiation, radiation detector, measurement of energy spectrum, measurement of radioactivity, measurement for a level of radiation and county's statistics on radiation. The second parts explains handling radiation with treating of sealed radioisotope, treating unsealed source and radiation shield.

  15. Civilsamfundets ABC: H for Handling

    DEFF Research Database (Denmark)

    Lund, Anker Brink; Meyer, Gitte

    2015-01-01

    Hvad er civilsamfundet? Anker Brink Lund og Gitte Meyer fra CBS Center for Civil Society Studies gennemgår civilsamfundet bogstav for bogstav. Vi er nået til H for Handling.......Hvad er civilsamfundet? Anker Brink Lund og Gitte Meyer fra CBS Center for Civil Society Studies gennemgår civilsamfundet bogstav for bogstav. Vi er nået til H for Handling....

  16. Peak effect in twinned superconductors

    International Nuclear Information System (INIS)

    Larkin, A.I.; Marchetti, M.C.; Vinokur, V.M.

    1995-01-01

    A sharp maximum in the critical current J c as a function of temperature just below the melting point of the Abrikosov flux lattice has recently been observed in both low- and high-temperature superconductors. This peak effect is strongest in twinned crystals for fields aligned with the twin planes. We propose that this peak signals the breakdown of the collective pinning regime and the crossover to strong pinning of single vortices on the twin boundaries. This crossover is very sharp and can account for the steep drop of the differential resistivity observed in experiments. copyright 1995 The American Physical Society

  17. Topology Optimization of Vehicle Body Structure for Improved Ride & Handling

    OpenAIRE

    Lövgren, Sebastian; Norberg, Emil

    2011-01-01

    Ride and handling are important areas for safety and improved vehicle control during driving. To meet the demands on ride and handling a number of measures can be taken. This master thesis work has focused on the early design phase. At the early phases of design, the level of details is low and the design freedom is big. By introducing a tool to support the early vehicle body design, the potential of finding more efficient structures increases. In this study, topology optimization of a vehicl...

  18. The Potential for Energy Storage to Provide Peaking Capacity in California under Increased Penetration of Solar Photovoltaics: Report Summary

    Energy Technology Data Exchange (ETDEWEB)

    Denholm, Paul L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Margolis, Robert M [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-12

    Opportunities to provide peaking capacity with low-cost energy storage are emerging. But adding storage changes the ability of subsequent storage additions to meet peak demand. Increasing photovoltaic (PV) deployment also affects storage's ability to provide peak capacity. This study examines storage's potential to replace conventional peak capacity in California.

  19. Peak loads and network investments in sustainable energy transitions

    Energy Technology Data Exchange (ETDEWEB)

    Blokhuis, Erik, E-mail: e.g.j.blokhuis@tue.nl [Eindhoven University of Technology, Department of Architecture, Building and Planning, Vertigo 8.11, P.O. Box 513, 5600MB Eindhoven (Netherlands); Brouwers, Bart [Eindhoven University of Technology, Department of Architecture, Building and Planning, Vertigo 8.11, P.O. Box 513, 5600MB Eindhoven (Netherlands); Putten, Eric van der [Endinet, Gas and Electricity Network Operations, P.O. Box 2005, 5600CA Eindhoven (Netherlands); Schaefer, Wim [Eindhoven University of Technology, Department of Architecture, Building and Planning, Vertigo 8.11, P.O. Box 513, 5600MB Eindhoven (Netherlands)

    2011-10-15

    Current energy distribution networks are often not equipped for facilitating expected sustainable transitions. Major concerns for future electricity networks are the possibility of peak load increases and the expected growth of decentralized energy generation. In this article, we focus on peak load increases; the effects of possible future developments on peak loads are studied, together with the consequences for the network. The city of Eindhoven (the Netherlands) is used as reference city, for which a scenario is developed in which the assumed future developments adversely influence the maximum peak loads on the network. In this scenario, the total electricity peak load in Eindhoven is expected to increase from 198 MVA in 2009 to 591-633 MVA in 2040. The necessary investments for facilitating the expected increased peak loads are estimated at 305-375 million Euros. Based upon these projections, it is advocated that - contrary to current Dutch policy - choices regarding sustainable transitions should be made from the viewpoint of integral energy systems, evaluating economic implications of changes to generation, grid development, and consumption. Recently applied and finished policies on energy demand reduction showed to be effective; however, additional and connecting policies on energy generation and distribution should be considered on short term. - Highlights: > Sustainable energy transitions can result in major electricity peak load increases. > Introduction of heat pumps and electrical vehicles requires network expansion. > Under worst case assumptions, peak loads in Eindhoven increase with 200% until 2040. > The necessary investment for facilitating this 2040 peak demand is Euro 305-375 million. > Future policy choices should be made from the viewpoint of the integral energy system.

  20. Peak loads and network investments in sustainable energy transitions

    International Nuclear Information System (INIS)

    Blokhuis, Erik; Brouwers, Bart; Putten, Eric van der; Schaefer, Wim

    2011-01-01

    Current energy distribution networks are often not equipped for facilitating expected sustainable transitions. Major concerns for future electricity networks are the possibility of peak load increases and the expected growth of decentralized energy generation. In this article, we focus on peak load increases; the effects of possible future developments on peak loads are studied, together with the consequences for the network. The city of Eindhoven (the Netherlands) is used as reference city, for which a scenario is developed in which the assumed future developments adversely influence the maximum peak loads on the network. In this scenario, the total electricity peak load in Eindhoven is expected to increase from 198 MVA in 2009 to 591-633 MVA in 2040. The necessary investments for facilitating the expected increased peak loads are estimated at 305-375 million Euros. Based upon these projections, it is advocated that - contrary to current Dutch policy - choices regarding sustainable transitions should be made from the viewpoint of integral energy systems, evaluating economic implications of changes to generation, grid development, and consumption. Recently applied and finished policies on energy demand reduction showed to be effective; however, additional and connecting policies on energy generation and distribution should be considered on short term. - Highlights: → Sustainable energy transitions can result in major electricity peak load increases. → Introduction of heat pumps and electrical vehicles requires network expansion. → Under worst case assumptions, peak loads in Eindhoven increase with 200% until 2040. → The necessary investment for facilitating this 2040 peak demand is Euro 305-375 million. → Future policy choices should be made from the viewpoint of the integral energy system.

  1. Peaking of world oil production: Impacts, mitigation, & risk management

    Energy Technology Data Exchange (ETDEWEB)

    Hirsch, R.L. (SAIC); Bezdek, Roger (MISI); Wendling, Robert (MISI)

    2005-02-01

    The peaking of world oil production presents the U.S. and the world with an unprecedented risk management problem. As peaking is approached, liquid fuel prices and price volatility will increase dramatically, and, without timely mitigation, the economic, social, and political costs will be unprecedented. Viable mitigation options exist on both the supply and demand sides, but to have substantial impact, they must be initiated more than a decade in advance of peaking.... The purpose of this analysis was to identify the critical issues surrounding the occurrence and mitigation of world oil production peaking. We simplified many of the complexities in an effort to provide a transparent analysis. Nevertheless, our study is neither simple nor brief. We recognize that when oil prices escalate dramatically, there will be demand and economic impacts that will alter our simplified assumptions. Consideration of those feedbacks will be a daunting task but one that should be undertaken. Our aim in this study is to-- • Summarize the difficulties of oil production forecasting; • Identify the fundamentals that show why world oil production peaking is such a unique challenge; • Show why mitigation will take a decade or more of intense effort; • Examine the potential economic effects of oil peaking; • Describe what might be accomplished under three example mitigation scenarios. • Stimulate serious discussion of the problem, suggest more definitive studies, and engender interest in timely action to mitigate its impacts.

  2. Hubbert's Peak -- A Physicist's View

    Science.gov (United States)

    McDonald, Richard

    2011-04-01

    Oil, as used in agriculture and transportation, is the lifeblood of modern society. It is finite in quantity and will someday be exhausted. In 1956, Hubbert proposed a theory of resource production and applied it successfully to predict peak U.S. oil production in 1970. Bartlett extended this work in publications and lectures on the finite nature of oil and its production peak and depletion. Both Hubbert and Bartlett place peak world oil production at a similar time, essentially now. Central to these analyses are estimates of total ``oil in place'' obtained from engineering studies of oil reservoirs as this quantity determines the area under the Hubbert's Peak. Knowing the production history and the total oil in place allows us to make estimates of reserves, and therefore future oil availability. We will then examine reserves data for various countries, in particular OPEC countries, and see if these data tell us anything about the future availability of oil. Finally, we will comment on synthetic oil and the possibility of carbon-neutral synthetic oil for a sustainable future.

  3. VVER NPPs fuel handling machine control system

    International Nuclear Information System (INIS)

    Mini, G.; Rossi, G.; Barabino, M.; Casalini, M.

    2002-01-01

    In order to increase the safety level of the fuel handling machine on WWER NPPs, Ansaldo Nucleare was asked to design and supply a new Control System. Two Fuel Handling Machine (FHM) Control System units have been already supplied for Temelin NPP and others supply are in process for the Atommash company, which has in charge the supply of FHMs for NPPs located in Russia, Ukraine and China.The computer-based system takes into account all the operational safety interlocks so that it is able to avoid incorrect and dangerous manoeuvres in the case of operator error. Control system design criteria, hardware and software architecture, and quality assurance control, are in accordance with the most recent international requirements and standards, and in particular for electromagnetic disturbance immunity demands and seismic compatibility. The hardware architecture of the control system is based on ABB INFI 90 system. The microprocessor-based ABB INFI 90 system incorporates and improves upon many of the time proven control capabilities of Bailey Network 90, validated over 14,000 installations world-wide.The control system complies all the former designed sensors and devices of the machine and markedly the angular position measurement sensors named 'selsyn' of Russian design. Nevertheless it is fully compatible with all the most recent sensors and devices currently available on the market (for ex. Multiturn absolute encoders).All control logic were developed using standard INFI 90 Engineering Work Station, interconnecting blocks extracted from an extensive SAMA library by using a graphical approach (CAD) and allowing and easier intelligibility, more flexibility and updated and coherent documentation. The data acquisition system and the Man Machine Interface are implemented by ABB in co-operation with Ansaldo. The flexible and powerful software structure of 1090 Work-stations (APMS - Advanced Plant Monitoring System, or Tenore NT) has been successfully used to interface the

  4. Peak MSC—Are We There Yet?

    Directory of Open Access Journals (Sweden)

    Timothy R. Olsen

    2018-06-01

    Full Text Available Human mesenchymal stem cells (hMSCs are a critical raw material for many regenerative medicine products, including cell-based therapies, engineered tissues, or combination products, and are on the brink of radically changing how the world of medicine operates. Their unique characteristics, potential to treat many indications, and established safety profile in more than 800 clinical trials have contributed to their current consumption and will only fuel future demand. Given the large target patient populations with typical dose sizes of 10's to 100's of millions of cells per patient, and engineered tissues being constructed with 100's of millions to billions of cells, an unprecedented demand has been created for hMSCs. The fulfillment of this demand faces an uphill challenge in the limited availability of large quantities of pharmaceutical grade hMSCs for the industry—fueling the need for parallel rapid advancements in the biomanufacturing of this living critical raw material. Simply put, hMSCs are no different than technologies like transistors, as they are a highly technical and modular product that requires stringent control over manufacturing that can allow for high quality and consistent performance. As hMSC manufacturing processes are optimized, it predicts a future time of abundance for hMSCs, where scientists and researchers around the world will have access to a consistent and readily available supply of high quality, standardized, and economical pharmaceutical grade product to buy off the shelf for their applications and drive product development—this is “Peak MSC.”

  5. A Theoretic Model of Transport Logistics Demand

    OpenAIRE

    Natalija Jolić; Nikolina Brnjac; Ivica Oreb

    2006-01-01

    Concerning transport logistics as relation between transportand integrated approaches to logistics, some transport and logisticsspecialists consider the tenn tautological. However,transport is one of the components of logistics, along with inventories,resources, warehousing, infonnation and goods handling.Transport logistics considers wider commercial and operationalframeworks within which the flow of goods is plannedand managed. The demand for transport logistics services canbe valorised as ...

  6. Asthma, guides for diagnostic and handling

    International Nuclear Information System (INIS)

    Salgado, Carlos E; Caballero A, Andres S; Garcia G, Elizabeth

    1999-01-01

    The paper defines the asthma, includes topics as diagnostic, handling of the asthma, special situations as asthma and pregnancy, handling of the asthmatic patient's perioperatory and occupational asthma

  7. SRV-automatic handling device

    International Nuclear Information System (INIS)

    Yamada, Koji

    1987-01-01

    Automatic handling device for the steam relief valves (SRV's) is developed in order to achieve a decrease in exposure of workers, increase in availability factor, improvement in reliability, improvement in safety of operation, and labor saving. A survey is made during a periodical inspection to examine the actual SVR handling operation. An SRV automatic handling device consists of four components: conveyor, armed conveyor, lifting machine, and control/monitoring system. The conveyor is so designed that the existing I-rail installed in the containment vessel can be used without any modification. This is employed for conveying an SRV along the rail. The armed conveyor, designed for a box rail, is used for an SRV installed away from the rail. By using the lifting machine, an SRV installed away from the I-rail is brought to a spot just below the rail so that the SRV can be transferred by the conveyor. The control/monitoring system consists of a control computer, operation panel, TV monitor and annunciator. The SRV handling device is operated by remote control from a control room. A trial equipment is constructed and performance/function testing is carried out using actual SRV's. As a result, is it shown that the SRV handling device requires only two operators to serve satisfactorily. The required time for removal and replacement of one SRV is about 10 minutes. (Nogami, K.)

  8. Considering supply and demand of electric energy in life cycle assessments - a review of current methodologies

    International Nuclear Information System (INIS)

    Rehberger, M.; Hiete, M.

    2015-01-01

    A stable power grid requires a balance between electricity supply and demand. To compensate for changes in the demand the network operator puts on or takes off power plants from the net. Peak load plants operate only at times of high electricity demand. As levels for air pollutants emissions are typically lower for peak load plants for reasons of cost-effectiveness, one could argue that a unit of electric energy consumed during peak load has always been associated with a higher environmental impact than at other times. Furthermore, renewable energy technologies, smart approaches for improving the matching between electricity consumption and supply and new products such as electric vehicles or net zero emission buildings gain in importance. In life cycle assessment (LCA) environmental impacts associated with the production and possibly transmission of electricity are most often assessed based on temporally averaged national electricity mixes as electricity flows cannot be traced back to their origin. Neither fluctuations in the supply structure nor the composition of energy supply at a certain moment or regional differences are accounted for. A literature review of approaches for handling electricity in LCA is carried out to compare strengths and weaknesses of the approaches. A better understanding and knowledge about the source of electricity at a given time and place might be valuable information for further reducing environmental impacts, e.g. by shifting electricity consumption to times with ample supply of renewables. Integrating such information into LCA will allow a fairer assessment of a variety of new products which accept a lower energy efficiency to achieve a better integration of renewables into the grid. (authors)

  9. SPANISH PEAKS PRIMITIVE AREA, MONTANA.

    Science.gov (United States)

    Calkins, James A.; Pattee, Eldon C.

    1984-01-01

    A mineral survey of the Spanish Peaks Primitive Area, Montana, disclosed a small low-grade deposit of demonstrated chromite and asbestos resources. The chances for discovery of additional chrome resources are uncertain and the area has little promise for the occurrence of other mineral or energy resources. A reevaluation, sampling at depth, and testing for possible extensions of the Table Mountain asbestos and chromium deposit should be undertaken in the light of recent interpretations regarding its geologic setting.

  10. Neurofeedback training for peak performance

    OpenAIRE

    Marek Graczyk; Maria Pąchalska; Artur Ziółkowski; Grzegorz Mańko; Beata Łukaszewska; Kazimierz Kochanowicz; Andrzej Mirski; Iurii D. Kropotov

    2014-01-01

    [b]aim[/b]. One of the applications of the Neurofeedback methodology is peak performance in sport. The protocols of the neurofeedback are usually based on an assessment of the spectral parameters of spontaneous EEG in resting state conditions. The aim of the paper was to study whether the intensive neurofeedback training of a well-functioning Olympic athlete who has lost his performance confidence after injury in sport, could change the brain functioning reflected in changes in spontaneou...

  11. Power peaking nuclear reliability factors

    International Nuclear Information System (INIS)

    Hassan, H.A.; Pegram, J.W.; Mays, C.W.; Romano, J.J.; Woods, J.J.; Warren, H.D.

    1977-11-01

    The Calculational Nuclear Reliability Factor (CNRF) assigned to the limiting power density calculated in reactor design has been determined. The CNRF is presented as a function of the relative power density of the fuel assembly and its radial local. In addition, the Measurement Nuclear Reliability Factor (MNRF) for the measured peak hot pellet power in the core has been evaluated. This MNRF is also presented as a function of the relative power density and radial local within the fuel assembly

  12. Evaluation of concurrent peak responses

    International Nuclear Information System (INIS)

    Wang, P.C.; Curreri, J.; Reich, M.

    1983-01-01

    This report deals with the problem of combining two or more concurrent responses which are induced by dynamic loads acting on nuclear power plant structures. Specifically, the acceptability of using the square root of the sum of the squares (SRSS) value of peak values as the combined response is investigated. Emphasis is placed on the establishment of a simplified criterion that is convenient and relatively easy to use by design engineers

  13. Finding two-dimensional peaks

    International Nuclear Information System (INIS)

    Silagadze, Z.K.

    2007-01-01

    Two-dimensional generalization of the original peak finding algorithm suggested earlier is given. The ideology of the algorithm emerged from the well-known quantum mechanical tunneling property which enables small bodies to penetrate through narrow potential barriers. We merge this 'quantum' ideology with the philosophy of Particle Swarm Optimization to get the global optimization algorithm which can be called Quantum Swarm Optimization. The functionality of the newborn algorithm is tested on some benchmark optimization problems

  14. Non-residential water demand model validated with extensive measurements and surveys

    NARCIS (Netherlands)

    Pieterse-Quirijns, I.; Blokker, E.J.M.; van der Blom, E.C.; Vreeburg, J.H.G.

    2013-01-01

    Existing Dutch guidelines for the design of the drinking water and hot water system of nonresidential buildings are based on outdated assumptions on peak water demand or on unfounded assumptions on hot water demand. They generally overestimate peak demand values required for the design of an

  15. Reproductive handle of the herd of cattle of double purpose

    International Nuclear Information System (INIS)

    Castro Hernandez, A.

    1988-01-01

    The influence of the environmental factors is analyzed, in the reproductive efficiency of herd cattle of double purpose. The reproductive behavior begins with the gestation of the heifers. Under the conditions of the Colombian tropic these they reach the weight required for the reproduction to an age but late that in the temperate areas. Once the first childbirth, the cow takes place it enters in exhaustion that makes that this animal is the but difficult to reproduce after the childbirth, that which demands special cares of handling and feeding. The interval among the childbirth to evaluate the reproductive efficiency. Environmental factors that influence significantly. The use of the practice simple of handling, health, selection and feeding produces significant increments in the fertility of the herd of cattle of double purpose. One practices of effective handling in the improvement of the reproductive behavior of the cows of double purpose it is the restricted nursing

  16. Handling of waste in ports

    International Nuclear Information System (INIS)

    Olson, P.H.

    1994-01-01

    The regulations governing the handling of port-generated waste are often national and/or local legislation, whereas the handling of ship-generated waste is governed by the MARPOL Convention in most parts of the world. The handling of waste consists of two main phases -collection and treatment. Waste has to be collected in every port and on board every ship, whereas generally only some wastes are treated and to a certain degree in ports and on board ships. This paper considers the different kinds of waste generated in both ports and on board ships, where and how it is generated, how it could be collected and treated. The two sources are treated together to show how some ship-generated waste may be treated in port installations primarily constructed for the treatment of the port-generated waste, making integrated use of the available treatment facilities. (author)

  17. On-Demand Telemetry

    Data.gov (United States)

    National Aeronautics and Space Administration — AFRC has previously investigated the use of Network Based Telemetry. We will be building on that research to enable On-Demand Telemetry. On-Demand Telemetry is a way...

  18. Money Demand in Latvia

    OpenAIRE

    Ivars Tillers

    2004-01-01

    The econometric analysis of the demand for broad money in Latvia suggests a stable relationship of money demand. The analysis of parameter exogeneity indicates that the equilibrium adjustment is driven solely by the changes in the amount of money. The demand for money in Latvia is characterised by relatively high income elasticity typical for the economy in a monetary expansion phase. Due to stability, close fit of the money demand function and rapid equilibrium adjustment, broad money aggreg...

  19. Drivers of peak sales for pharmaceutical brands

    NARCIS (Netherlands)

    Fischer, Marc; Leeflang, Peter S. H.; Verhoef, Peter C.

    2010-01-01

    Peak sales are an important metric in the pharmaceutical industry. Specifically, managers are focused on the height-of-peak-sales and the time required achieving peak sales. We analyze how order of entry and quality affect the level of peak sales and the time-to-peak-sales of pharmaceutical brands.

  20. Physical load handling and listening comprehension effects on balance control.

    Science.gov (United States)

    Qu, Xingda

    2010-12-01

    The purpose of this study was to determine the physical load handling and listening comprehension effects on balance control. A total of 16 young and 16 elderly participants were recruited in this study. The physical load handling task required holding a 5-kg load in each hand with arms at sides. The listening comprehension task involved attentive listening to a short conversation. Three short questions were asked regarding the conversation right after the testing trial to test the participants' attentiveness during the experiment. Balance control was assessed by centre of pressure-based measures, which were calculated from the force platform data when the participants were quietly standing upright on a force platform. Results from this study showed that both physical load handling and listening comprehension adversely affected balance control. Physical load handling had a more deleterious effect on balance control under the listening comprehension condition vs. no-listening comprehension condition. Based on the findings from this study, interventions for the improvement of balance could be focused on avoiding exposures to physically demanding tasks and cognitively demanding tasks simultaneously. STATEMENT OF RELEVANCE: Findings from this study can aid in better understanding how humans maintain balance, especially when physical and cognitive loads are applied. Such information is useful for developing interventions to prevent fall incidents and injuries in occupational settings and daily activities.

  1. Data handling for the wide-angle hall jet experiment

    International Nuclear Information System (INIS)

    Cassel, D.; Engelmann, R.; Gordon, H.; Grannis, P.; Mallik, U.; Meadows, B.; Morris, T.; Plano, R.; Saulys, A.; Stein, S.

    1978-01-01

    The data handling needs for a jet production experiment in the wide-angle hall are discussed. The several layers of triggering and a data acquisition system were designed, the configuration of the local intersection computer system was discussed, and the time required to analyze a typical event was estimated. It was concluded that the experiment does not appear to place unrealistic demands on detector technology. The slow trigger was believed to be the crucial aspect of the experiment. 15 figures, 1 tables

  2. National energy peak leveling program (NEPLP). Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    This multisectioned three-Volume report is responsive to the requirements of Contract E (04-3)-1152 to provide a detailed methodology, to include management, technology, and socio-economic aspects, of a voluntary community program of computer-assisted peak load leveling and energy conservation in commercial community facilities. The demonstration project established proof-of-concept in reducing the kW-demand peak by the unofficial goal of 10%, with concurrent kWh savings. This section of volume III contains appendixes of information on load shedding determination, analysis, socio-economic study, contractual cross references, and definitions.

  3. National energy peak leveling program (NEPLP). Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    This three-volume report is responsive to the requirements of contract E (04-3)-1152 to provide a detailed methodology, to include management, technology, and socio-economic aspects, of a voluntary community program for computer-assisted peak load leveling and energy conservation in commercial community facilities. The demonstration project established proof-of-concept in reducing the kW-demand peak by the unofficial goal of 10%, with concurrent kWh savings. The report consists of the following three volumes: Volume I: management overview; Volume II: methodology and technology; and Volume III; appendices.

  4. Addressing Energy Demand through Demand Response. International Experiences and Practices

    Energy Technology Data Exchange (ETDEWEB)

    Shen, Bo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ghatikar, Girish [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ni, Chun Chun [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dudley, Junqiao [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Martin, Phil [Enernoc, Inc., Boston, MA (United States); Wikler, Greg

    2012-06-01

    Demand response (DR) is a load management tool which provides a cost-effective alternative to traditional supply-side solutions to address the growing demand during times of peak electrical load. According to the US Department of Energy (DOE), demand response reflects “changes in electric usage by end-use customers from their normal consumption patterns in response to changes in the price of electricity over time, or to incentive payments designed to induce lower electricity use at times of high wholesale market prices or when system reliability is jeopardized.” 1 The California Energy Commission (CEC) defines DR as “a reduction in customers’ electricity consumption over a given time interval relative to what would otherwise occur in response to a price signal, other financial incentives, or a reliability signal.” 2 This latter definition is perhaps most reflective of how DR is understood and implemented today in countries such as the US, Canada, and Australia where DR is primarily a dispatchable resource responding to signals from utilities, grid operators, and/or load aggregators (or DR providers).

  5. Software for handling MFME1

    International Nuclear Information System (INIS)

    Van der Merwe, W.G.

    1984-01-01

    The report deals with SEMFIP, a computer code for determining magnetic field measurements. The program is written in FORTRAN and ASSEMBLER. The preparations for establishing SEMFIP, the actual measurements, data handling and the problems that were experienced are discussed. Details on the computer code are supplied in an appendix

  6. Welding method by remote handling

    International Nuclear Information System (INIS)

    Hashinokuchi, Minoru.

    1994-01-01

    Water is charged into a pit (or a water reservoir) and an article to be welded is placed on a support in the pit by remote handling. A steel plate is disposed so as to cover the article to be welded by remote handling. The welding device is positioned to the portion to be welded and fixed in a state where the article to be welded is shielded from radiation by water and the steel plate. Water in the pit is drained till the portion to be welded is exposed to the atmosphere. Then, welding is conducted. After completion of the welding, water is charged again to the pit and the welding device and fixing jigs are decomposed in a state where the article to be welded is shielded again from radiation by water and the steel plate. Subsequently, the steel plate is removed by remote handling. Then, the article to be welded is returned from the pit to a temporary placing pool by remote handling. This can reduce operator's exposure. Further, since the amount of the shielding materials can be minimized, the amount of radioactive wastes can be decreased. (I.N.)

  7. Electricity demand in Kazakhstan

    International Nuclear Information System (INIS)

    Atakhanova, Zauresh; Howie, Peter

    2007-01-01

    Properties of electricity demand in transition economies have not been sufficiently well researched mostly due to data limitations. However, information on the properties of electricity demand is necessary for policy makers to evaluate effects of price changes on different consumers and obtain demand forecasts for capacity planning. This study estimates Kazakhstan's aggregate demand for electricity as well as electricity demand in the industrial, service, and residential sectors using regional data. Firstly, our results show that price elasticity of demand in all sectors is low. This fact suggests that there is considerable room for price increases necessary to finance generation and distribution system upgrading. Secondly, we find that income elasticity of demand in the aggregate and all sectoral models is less than unity. Of the three sectors, electricity demand in the residential sector has the lowest income elasticity. This result indicates that policy initiatives to secure affordability of electricity consumption to lower income residential consumers may be required. Finally, our forecast shows that electricity demand may grow at either 3% or 5% per year depending on rates of economic growth and government policy regarding price increases and promotion of efficiency. We find that planned supply increases would be sufficient to cover growing demand only if real electricity prices start to increase toward long-run cost-recovery levels and policy measures are implemented to maintain the current high growth of electricity efficiency

  8. Forecasting Strategies for Predicting Peak Electric Load Days

    Science.gov (United States)

    Saxena, Harshit

    Academic institutions spend thousands of dollars every month on their electric power consumption. Some of these institutions follow a demand charges pricing structure; here the amount a customer pays to the utility is decided based on the total energy consumed during the month, with an additional charge based on the highest average power load required by the customer over a moving window of time as decided by the utility. Therefore, it is crucial for these institutions to minimize the time periods where a high amount of electric load is demanded over a short duration of time. In order to reduce the peak loads and have more uniform energy consumption, it is imperative to predict when these peaks occur, so that appropriate mitigation strategies can be developed. The research work presented in this thesis has been conducted for Rochester Institute of Technology (RIT), where the demand charges are decided based on a 15 minute sliding window panned over the entire month. This case study makes use of different statistical and machine learning algorithms to develop a forecasting strategy for predicting the peak electric load days of the month. The proposed strategy was tested for a whole year starting May 2015 to April 2016 during which a total of 57 peak days were observed. The model predicted a total of 74 peak days during this period, 40 of these cases were true positives, hence achieving an accuracy level of 70 percent. The results obtained with the proposed forecasting strategy are promising and demonstrate an annual savings potential worth about $80,000 for a single submeter of RIT.

  9. Peak Running Intensity of International Rugby: Implications for Training Prescription.

    Science.gov (United States)

    Delaney, Jace A; Thornton, Heidi R; Pryor, John F; Stewart, Andrew M; Dascombe, Ben J; Duthie, Grant M

    2017-09-01

    To quantify the duration and position-specific peak running intensities of international rugby union for the prescription and monitoring of specific training methodologies. Global positioning systems (GPS) were used to assess the activity profile of 67 elite-level rugby union players from 2 nations across 33 international matches. A moving-average approach was used to identify the peak relative distance (m/min), average acceleration/deceleration (AveAcc; m/s 2 ), and average metabolic power (P met ) for a range of durations (1-10 min). Differences between positions and durations were described using a magnitude-based network. Peak running intensity increased as the length of the moving average decreased. There were likely small to moderate increases in relative distance and AveAcc for outside backs, halfbacks, and loose forwards compared with the tight 5 group across all moving-average durations (effect size [ES] = 0.27-1.00). P met demands were at least likely greater for outside backs and halfbacks than for the tight 5 (ES = 0.86-0.99). Halfbacks demonstrated the greatest relative distance and P met outputs but were similar to outside backs and loose forwards in AveAcc demands. The current study has presented a framework to describe the peak running intensities achieved during international rugby competition by position, which are considerably higher than previously reported whole-period averages. These data provide further knowledge of the peak activity profiles of international rugby competition, and this information can be used to assist coaches and practitioners in adequately preparing athletes for the most demanding periods of play.

  10. Research Opportunities at Storm Peak Laboratory

    Science.gov (United States)

    Hallar, A. G.; McCubbin, I. B.

    2006-12-01

    The Desert Research Institute (DRI) operates a high elevation facility, Storm Peak Laboratory (SPL), located on the west summit of Mt. Werner in the Park Range near Steamboat Springs, Colorado at an elevation of 3210 m MSL (Borys and Wetzel, 1997). SPL provides an ideal location for long-term research on the interactions of atmospheric aerosol and gas- phase chemistry with cloud and natural radiation environments. The ridge-top location produces almost daily transition from free tropospheric to boundary layer air which occurs near midday in both summer and winter seasons. Long-term observations at SPL document the role of orographically induced mixing and convection on vertical pollutant transport and dispersion. During winter, SPL is above cloud base 25% of the time, providing a unique capability for studying aerosol-cloud interactions (Borys and Wetzel, 1997). A comprehensive set of continuous aerosol measurements was initiated at SPL in 2002. SPL includes an office-type laboratory room for computer and instrumentation setup with outside air ports and cable access to the roof deck, a cold room for precipitation and cloud rime ice sample handling and ice crystal microphotography, a 150 m2 roof deck area for outside sampling equipment, a full kitchen and two bunk rooms with sleeping space for nine persons. The laboratory is currently well equipped for aerosol and cloud measurements. Particles are sampled from an insulated, 15 cm diameter manifold within approximately 1 m of its horizontal entry point through an outside wall. The 4 m high vertical section outside the building is capped with an inverted can to exclude large particles.

  11. Innovation and Demand

    DEFF Research Database (Denmark)

    Andersen, Esben Sloth

    2007-01-01

    the demand-side of markets in the simplest possible way. This strategy has allowed a gradual increase in the sophistication of supply-side aspects of economic evolution, but the one-sided focus on supply is facing diminishing returns. Therefore, demand-side aspects of economic evolution have in recent years...... received increased attention. The present paper argues that the new emphasis on demand-side factors is quite crucial for a deepened understanding of economic evolution. The major reasons are the following: First, demand represents the core force of selection that gives direction to the evolutionary process....... Second, firms' innovative activities relate, directly or indirectly, to the structure of expected and actual demand. Third, the demand side represents the most obvious way of turning to the much-needed analysis of macro-evolutionary change of the economic system....

  12. Roadway network productivity assessment : system-wide analysis under variant travel demand

    Science.gov (United States)

    2008-11-01

    The analysis documented in this report examines the hypothesis that the system-wide productivity of a metropolitan freeway system in peak periods is higher in moderate travel demand conditions than in excessive travel demand conditions. The approach ...

  13. PERFECT DEMAND ILLUSION

    Directory of Open Access Journals (Sweden)

    Alexander Yu. Sulimov

    2015-01-01

    Full Text Available The article is devoted to technique «Perfect demand illusion», which allows to strengthen the competitive advantageof retailers. Also in the paper spells out the golden rules of visual merchandising.The definition of the method «Demand illusion», formulated the conditions of its functioning, and is determined by the mainhypothesis of the existence of this method.Furthermore, given the definition of the «Perfect demand illusion», and describes its additional conditions. Also spells out the advantages of the «Perfect demandillusion», before the «Demand illusion».

  14. Divers of Passenger Demand

    OpenAIRE

    Wittmer, Andreas

    2011-01-01

    -Overview drivers of passenger demand -Driver 1: Economic growth in developing countries -Driver 2: International business travel in developed countries -Driver 3: International leisure travel in developed countries

  15. Experience in handling concentrated tritium

    International Nuclear Information System (INIS)

    Holtslander, W.J.

    1985-12-01

    The notes describe the experience in handling concentrated tritium in the hydrogen form accumulated in the Chalk River Nuclear Laboratories Tritium Laboratory. The techniques of box operation, pumping systems, hydriding and dehydriding operations, and analysis of tritium are discussed. Information on the Chalk River Tritium Extraction Plant is included as a collection of reprints of papers presented at the Dayton Meeting on Tritium Technology, 1985 April 30 - May 2

  16. International handling of fissionable material

    International Nuclear Information System (INIS)

    1975-01-01

    The opinion of the ministry for foreign affairs on international handling of fissionable materials is given. As an introduction a survey is given of the possibilities to produce nuclear weapons from materials used in or produced by power reactors. Principles for international control of fissionable materials are given. International agreements against proliferation of nuclear weapons are surveyed and methods to improve them are proposed. (K.K.)

  17. Confinement facilities for handling plutonium

    International Nuclear Information System (INIS)

    Maraman, W.J.; McNeese, W.D.; Stafford, R.G.

    1975-01-01

    Plutonium handling on a multigram scale began in 1944. Early criteria, equipment, and techniques for confining contamination have been superseded by more stringent criteria and vastly improved equipment and techniques for in-process contamination control, effluent air cleaning and treatment of liquid wastes. This paper describes the evolution of equipment and practices to minimize exposure of workers and escape of contamination into work areas and into the environment. Early and current contamination controls are compared. (author)

  18. Remote handling equipment for SNS

    International Nuclear Information System (INIS)

    Poulten, B.H.

    1983-01-01

    This report gives information on the areas of the SNS, facility which become highly radioactive preventing hands-on maintenance. Levels of activity are sufficiently high in the Target Station Area of the SNS, especially under fault conditions, to warrant reactor technology to be used in the design of the water, drainage and ventilation systems. These problems, together with the type of remote handling equipment required in the SNS, are discussed

  19. Remote handling in reprocessing plants

    International Nuclear Information System (INIS)

    Streiff, G.

    1984-01-01

    Remote control will be the rule for maintenance in hot cells of future spent fuel reprocessing plants because of the radioactivity level. New handling equipments will be developed and intervention principles defined. Existing materials, recommendations for use and new manipulators are found in the PMDS' documentation. It is also a help in the choice and use of intervention means and a guide for the user [fr

  20. Equipment for the handling of thorium materials

    International Nuclear Information System (INIS)

    Heisler, S.W. Jr.; Mihalovich, G.S.

    1988-01-01

    The Feed Materials Production Center (FMPC) is the United States Department of Energy's storage facility for thorium. FMPC thorium handling and overpacking projects ensure the continued safe handling and storage of the thorium inventory until final disposition of the materials is determined and implemented. The handling and overpacking of the thorium materials requires the design of a system that utilizes remote handling and overpacking equipment not currently utilized at the FMPC in the handling of uranium materials. The use of remote equipment significantly reduces radiation exposure to personnel during the handling and overpacking efforts. The design system combines existing technologies from the nuclear industry, the materials processing and handling industry and the mining industry. The designed system consists of a modified fork lift truck for the transport of thorium containers, automated equipment for material identification and inventory control, and remote handling and overpacking equipment for material identification and inventory control, and remote handling and overpacking equipment for repackaging of the thorium materials

  1. Oil demand asymmetry in the OECD

    International Nuclear Information System (INIS)

    Shealy, M.T.

    1990-01-01

    Oil demand asymmetry exists, is significant, and can be captured with a simple demand equation using a Pmax term. The unstable parameters of the original symmetric equations suggest misspecification. Addition of a Pmax term to represent asymmetry yields stable parameters from 1982 through 1989 and so suggests proper specification. Asymmetry is significant because the short-run (and long-run) price elasticity is less than half as large when oil price falls as when price rises beyond the past peak. The lower elasticity applies both to price decreases and also to price increases for which price remains below the past peak. As long as the real oil price remains well below the 1981 peak, asymmetry implies that OECD oil demand should be less sensitive to oil price variations than in 1981. More specifically, the results shown suggest that today's oil demand elasticity should be less than half as large as the elasticity for a price increase in 1981. Forecasts from the asymmetric equations are significantly higher than the DOE base-case forecast. DOE's lower forecast is due to greater price asymmetry through 1995 and to higher long-run price elasticity beyond 1995. One reason for the higher long-run price elasticity might be greater assumed improvements in energy-efficiency than implied by the historical data

  2. Enteral Feeding Set Handling Techniques.

    Science.gov (United States)

    Lyman, Beth; Williams, Maria; Sollazzo, Janet; Hayden, Ashley; Hensley, Pam; Dai, Hongying; Roberts, Cristine

    2017-04-01

    Enteral nutrition therapy is common practice in pediatric clinical settings. Often patients will receive a pump-assisted bolus feeding over 30 minutes several times per day using the same enteral feeding set (EFS). This study aims to determine the safest and most efficacious way to handle the EFS between feedings. Three EFS handling techniques were compared through simulation for bacterial growth, nursing time, and supply costs: (1) rinsing the EFS with sterile water after each feeding, (2) refrigerating the EFS between feedings, and (3) using a ready-to-hang (RTH) product maintained at room temperature. Cultures were obtained at baseline, hour 12, and hour 21 of the 24-hour cycle. A time-in-motion analysis was conducted and reported in average number of seconds to complete each procedure. Supply costs were inventoried for 1 month comparing the actual usage to our estimated usage. Of 1080 cultures obtained, the overall bacterial growth rate was 8.7%. The rinse and refrigeration techniques displayed similar bacterial growth (11.4% vs 10.3%, P = .63). The RTH technique displayed the least bacterial growth of any method (4.4%, P = .002). The time analysis in minutes showed the rinse method was the most time-consuming (44.8 ± 2.7) vs refrigeration (35.8 ± 2.6) and RTH (31.08 ± 0.6) ( P refrigerating the EFS between uses is the next most efficacious method for handling the EFS between bolus feeds.

  3. WWER NPPs fuel handling machine control system

    International Nuclear Information System (INIS)

    Mini, G.; Rossi, G.; Barabino, M.; Casalini, M.

    2001-01-01

    In order to increase the safety level of the fuel handling machine on WWER NPPs, Ansaldo Nucleare was asked to design and supply a new Control System. Two FHM Control System units have been already supplied for Temelin NPP and others supplies are in process for the Atommash company, which has in charge the supply of FHMs for NPPs located in Russia, Ukraine and China. The Fuel Handling Machine (FHM) Control System is an integrated system capable of a complete management of nuclear fuel assemblies. The computer-based system takes into account all the operational safety interlocks so that it is able to avoid incorrect and dangerous manoeuvres in the case of operator error. Control system design criteria, hardware and software architecture, and quality assurance control, are in accordance with the most recent international requirements and standards, and in particular for electromagnetic disturbance immunity demands and seismic compatibility. The hardware architecture of the control system is based on ABB INFI 90 system. The microprocessor-based ABB INFI 90 system incorporates and improves upon many of the time proven control capabilities of Bailey Network 90, validated over 14,000 installations world-wide. The control system complies all the former designed sensors and devices of the machine and markedly the angular position measurement sensors named 'selsyn' of Russian design. Nevertheless it is fully compatible with all the most recent sensors and devices currently available on the market (for ex. Multiturn absolute encoders). All control logic components were developed using standard INFI 90 Engineering Work Station, interconnecting blocks extracted from an extensive SAMA library by using a graphical approach (CAD) and allowing an easier intelligibility, more flexibility and updated and coherent documentation. The data acquisition system and the Man Machine Interface are implemented by ABB in co-operation with Ansaldo. The flexible and powerful software structure

  4. Opportunities and Challenges of Demand Response in Active Distribution Grids

    DEFF Research Database (Denmark)

    Ponnaganti, Pavani; Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2018-01-01

    In power systems the installed generation capacity must exceed the annual peak demand, even though some capacity is kept idle most of the time. However, if it is uneconomical or not feasible to augment a sufficient capacity, the demand might exceed the available capacity. This mandates the system...

  5. Effects of demand elasticity and price variation on load profile

    NARCIS (Netherlands)

    Maqbool, S.D.; Babar, M.; Al-Ammar, E.A.

    2011-01-01

    Optimizing the operation of power generation systems is one of the core objectives of Smart Grid. The area of Smart Grid focuses on this issue is Demand Response (DR). DR is an essential tool to limit the demand to flatten spikes. This can reduce the need of peak power generation units which

  6. Ontario demand forecast from January 2004 to December 2013

    International Nuclear Information System (INIS)

    2003-01-01

    This document examined the demand forecast for electricity on the Independent Market Operator (IMO)-controlled grid in Ontario for the period 2004-2013. It serves as an assessment tool to determine whether existing and proposed generation and transmission facilities in the province will be sufficient to meet future electricity needs. Changes in methodology have been made to allow for an hourly peak versus the previously reported 20-minute peak value. Actual data through to the end of October 2002 was used to re-estimate energy demand. Compared to other developed countries, the outlook for the Canadian economy is optimistic. In addition, the economic forecast is better than that which formed the basis of the last ten-year forecast. Energy demand in the median growth scenario is increasing at an annual rate of 1.1 per cent rather than 0.9 per cent for the forecasted period of 2003-2012. The combination of a higher growth rate and a higher starting point results in a 2010 forecast of 168 TWh. It is expected that peak demand will grow faster than in the previous forecast. Summer peak demand averaging an annual growth of 1.3 per cent is forecasted for the period 2003-2012, with winter peak demand averaging a growth of 0.8 per cent. Under normal weather conditions, the electricity system is expected to peak in the summer of 2005 due to the continued demand for cooling load. However, under an extreme weather scenario, the system is already summer peaking. The improved economic outlook and higher starting point resulted in a higher forecast for energy. The electricity system is expected to winter peak during the first years of the forecasted period. The heating load is not expected to experience rapid growth in the next few years. 15 tabs., 14 figs

  7. Uranium supply and demand

    Energy Technology Data Exchange (ETDEWEB)

    Spriggs, M J

    1976-01-01

    Papers were presented on the pattern of uranium production in South Africa; Australian uranium--will it ever become available; North American uranium resources, policies, prospects, and pricing; economic and political environment of the uranium mining industry; alternative sources of uranium supply; whither North American demand for uranium; and uranium demand and security of supply--a consumer's point of view. (LK)

  8. Wood supply and demand

    Science.gov (United States)

    Peter J. Ince; David B. McKeever

    2011-01-01

    At times in history, there have been concerns that demand for wood (timber) would be greater than the ability to supply it, but that concern has recently dissipated. The wood supply and demand situation has changed because of market transitions, economic downturns, and continued forest growth. This article provides a concise overview of this change as it relates to the...

  9. Establishment of peak bone mass.

    Science.gov (United States)

    Mora, Stefano; Gilsanz, Vicente

    2003-03-01

    Among the main areas of progress in osteoporosis research during the last decade or so are the general recognition that this condition, which is the cause of so much pain in the elderly population, has its antecedents in childhood and the identification of the structural basis accounting for much of the differences in bone strength among humans. Nevertheless, current understanding of the bone mineral accrual process is far from complete. The search for genes that regulate bone mass acquisition is ongoing, and current results are not sufficient to identify subjects at risk. However, there is solid evidence that BMD measurements can be helpful for the selection of subjects that presumably would benefit from preventive interventions. The questions regarding the type of preventive interventions, their magnitude, and duration remain unanswered. Carefully designed controlled trials are needed. Nevertheless, previous experience indicates that weight-bearing activity and possibly calcium supplements are beneficial if they are begun during childhood and preferably before the onset of puberty. Modification of unhealthy lifestyles and increments in exercise or calcium assumption are logical interventions that should be implemented to improve bone mass gains in all children and adolescents who are at risk of failing to achieve an optimal peak bone mass.

  10. Neurofeedback training for peak performance

    Directory of Open Access Journals (Sweden)

    Marek Graczyk

    2014-11-01

    Full Text Available [b]aim[/b]. One of the applications of the Neurofeedback methodology is peak performance in sport. The protocols of the neurofeedback are usually based on an assessment of the spectral parameters of spontaneous EEG in resting state conditions. The aim of the paper was to study whether the intensive neurofeedback training of a well-functioning Olympic athlete who has lost his performance confidence after injury in sport, could change the brain functioning reflected in changes in spontaneous EEG and event related potentials (ERPs. [b]case study[/b]. The case is presented of an Olympic athlete who has lost his performance confidence after injury in sport. He wanted to resume his activities by means of neurofeedback training. His QEEG/ERP parameters were assessed before and after 4 intensive sessions of neurotherapy. Dramatic and statistically significant changes that could not be explained by error measurement were observed in the patient. [b]conclusion[/b]. Neurofeedback training in the subject under study increased the amplitude of the monitoring component of ERPs generated in the anterior cingulate cortex, accompanied by an increase in beta activity over the medial prefrontal cortex. Taking these changes together, it can be concluded that that even a few sessions of neurofeedback in a high performance brain can significantly activate the prefrontal cortical areas associated with increasing confidence in sport performance.

  11. Reactor power peaking information display

    International Nuclear Information System (INIS)

    Book, T.L.; Kochendarfer, R.A.

    1986-01-01

    This patent describes a system for monitoring operating conditions within a nuclear reactor. The system consists of a method for measuring the operating parameters within the nuclear reactor, including the position of axial power shaping rods and regulating control rod. It also includes a method for determining from the operating parameters the operating limits before a power peaking condition exists within the nuclear reactor, and a method for displaying the operating limits which consists of a visual display permitting the continuous monitoring of the operating conditions within the nuclear reactor as a graph of the shaping rod position vs the regulating rod position having a permissible area and a restricted area. The permissible area is further divided into a recommended operating area for steady state operation and a cursor located on the graph to indicate the present operating condition of the nuclear reactor to allow an operator to view any need for corrective action based on the movement of the cursor out of the recommended operating area and to take any corrective transient action within the permissible area

  12. Neurofeedback training for peak performance.

    Science.gov (United States)

    Graczyk, Marek; Pąchalska, Maria; Ziółkowski, Artur; Mańko, Grzegorz; Łukaszewska, Beata; Kochanowicz, Kazimierz; Mirski, Andrzej; Kropotov, Iurii D

    2014-01-01

    One of the applications of the Neurofeedback methodology is peak performance in sport. The protocols of the neurofeedback are usually based on an assessment of the spectral parameters of spontaneous EEG in resting state conditions. The aim of the paper was to study whether the intensive neurofeedback training of a well-functioning Olympic athlete who has lost his performance confidence after injury in sport, could change the brain functioning reflected in changes in spontaneous EEG and event related potentials (ERPs). The case is presented of an Olympic athlete who has lost his performance confidence after injury in sport. He wanted to resume his activities by means of neurofeedback training. His QEEG/ERP parameters were assessed before and after 4 intensive sessions of neurotherapy. Dramatic and statistically significant changes that could not be explained by error measurement were observed in the patient. Neurofeedback training in the subject under study increased the amplitude of the monitoring component of ERPs generated in the anterior cingulate cortex, accompanied by an increase in beta activity over the medial prefrontal cortex. Taking these changes together, it can be concluded that that even a few sessions of neurofeedback in a high performance brain can significantly activate the prefrontal cortical areas associated with increasing confidence in sport performance.

  13. Market Design Project. Demand Response Resources in Sweden - a summary

    International Nuclear Information System (INIS)

    Fritz, Peter

    2006-06-01

    An important discussion in later years has been whether the necessary reserves in the electricity market are to be generated through normal market mechanisms, i.e. with the price as the primary controlling parameter, or if it requires a collectively financed capacity reserve and how regulations in such a case should be shaped. The issue is first and foremost a matter of where the line is drawn between that which 'the market' should handle and that which can be assured through regulation. Autumn 2002 Svenska Kraftnaet (the Swedish TSO) presented an investigation to the government in which it was suggested that the capacity balance should primarily be managed through the use of normal pricing mechanisms, but that the state should strengthen responsibility for the nation's capacity balance in the period up until 2008. When approaching an effect loss situation, spot prices and balancing power prices will skyrocket. Today, most people are in agreement that a condition for maintained delivery safety is that normal pricing mechanisms are in place and that consumption actually is affected by high prices. The main reason for this conclusion is that it is very expensive to keep production facilities in reserve for situations that are expected to occur very seldom - it is cheaper to encourage large customers to reduce their consumption. The other reason is that increased price sensitivity creates conditions for a more stable and more predictable pricing development in strained situations. While being aware that a response to increased demand is needed, we see too little of that on the market today. The aim of this project is to present concrete measures that will awaken this slumbering resource. In order to judge how much demand response that can reasonably be expected and if there is any financial gain for customers, electricity suppliers and grid operators; it has been necessary to cast a few predictions about future price peaks. We estimate price peaks in the 3-10 SEK

  14. Province gets serious about demand management

    International Nuclear Information System (INIS)

    Anon

    2003-01-01

    Directives from the Minister to the Ontario Energy Board to review options for demand-side management and demand reduction activities, and discussion papers describing the policy framework needed to implement demand management, are indications of renewed interest by the provincial government in demand-side management of Ontario's electric power supply. This renewed interest comes on the hills of a 5.5 per cent increase in electricity use, a 33 per cent increase in imports, and consumption records broken in 10 of the last 12 months. A 117-page study was released in April by Navigant Consulting, entitled 'Demand response blueprint for Ontario' which estimates that if the Ontario market had 250 MW of additional demand response, customers providing the demand response would have saved $20 million by reducing their demand when HOEP was greater than $120/MWh, while other customers would have saved $170 million due to lower HOEP, and would have enjoyed greater reliability as a result of the increase in reserve margins. Other than price signals to induce customers to save, the Navigant report suggest paying customers not to consume during peak periods. The report estimates that such a policy could generate a total demand response of 350 MW and a $235 million reduction in revenue to generators. The Navigan report also includes a large number of detailed analysis and recommendations. One among them is for the extensive use of interval meters for customers with loads over 200 kW. The report tends to be critical of the recent price freeze ordered by the Ontario government, claiming that the freeze could increase consumption, making prices more volatile and increasing the cost to the government even more. Successful demand response programs from California, New York and the New England states are cited as examples for Ontario to emulate

  15. Basic demands for radiological information systems (RIS)

    International Nuclear Information System (INIS)

    Traupe, H.; Purgold, S.

    1993-01-01

    One of the most important problems in medicine today is quality control and the achievement of a cost-benefit analysis in the areas of both treatment and diagnosis. With modern software techniques, complex relations between medical and aministrative data can be shown up and analysed. Preconditions are a vocabulary that can be processed by computer for medical facts and decisions and a database system capable of collecting a large amount of heterogeneous data and costing everything precisely. We have developed an object description language and, on the basis of the relational database approach, a complex system covering most aspects of medical and administrative data handling in radiology. The basic demands and elements of modern information handling in radiology are described and discussed. (orig.) [de

  16. Saving our backs: safe patient handling and mobility for home care.

    Science.gov (United States)

    Beauvais, Audrey; Frost, Lenore

    2014-01-01

    Predicted work-related injuries for nurses and home healthcare workers are on the rise given the many risk factors in the home environment and the escalating demands for home healthcare workers in the United States. Fortunately, safe patient handling and mobility programs can dramatically decrease injuries. Despite strides being made to promote safe patient handling and mobility programs in acute care, more can be done to establish such initiatives in the home care setting.

  17. A Dynamic Programming-Based Heuristic for the Shift Design Problem in Airport Ground Handling

    DEFF Research Database (Denmark)

    Clausen, Tommy

    We consider the heterogeneous shift design problem for a workforce with multiple skills, where work shifts are created to cover a given demand as well as possible while minimizing cost and satisfying a flexible set of constraints. We focus mainly on applications within airport ground handling whe...... programming that allows flexibility in modeling the workforce. Parameters allow a planner to determine the level of demand coverage that best fulfills the requirements of the organization. Results are presented from several diverse real-life ground handling instances.......We consider the heterogeneous shift design problem for a workforce with multiple skills, where work shifts are created to cover a given demand as well as possible while minimizing cost and satisfying a flexible set of constraints. We focus mainly on applications within airport ground handling where...

  18. 7 CFR 926.9 - Handle.

    Science.gov (United States)

    2010-01-01

    ... the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE DATA COLLECTION, REPORTING AND RECORDKEEPING REQUIREMENTS APPLICABLE TO CRANBERRIES NOT SUBJECT TO THE CRANBERRY MARKETING ORDER § 926.9 Handle. Handle...

  19. HMSRP Hawaiian Monk Seal Handling Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains records for all handling and measurement of Hawaiian monk seals since 1981. Live seals are handled and measured during a variety of events...

  20. ERROR HANDLING IN INTEGRATION WORKFLOWS

    Directory of Open Access Journals (Sweden)

    Alexey M. Nazarenko

    2017-01-01

    Full Text Available Simulation experiments performed while solving multidisciplinary engineering and scientific problems require joint usage of multiple software tools. Further, when following a preset plan of experiment or searching for optimum solu- tions, the same sequence of calculations is run multiple times with various simulation parameters, input data, or conditions while overall workflow does not change. Automation of simulations like these requires implementing of a workflow where tool execution and data exchange is usually controlled by a special type of software, an integration environment or plat- form. The result is an integration workflow (a platform-dependent implementation of some computing workflow which, in the context of automation, is a composition of weakly coupled (in terms of communication intensity typical subtasks. These compositions can then be decomposed back into a few workflow patterns (types of subtasks interaction. The pat- terns, in their turn, can be interpreted as higher level subtasks.This paper considers execution control and data exchange rules that should be imposed by the integration envi- ronment in the case of an error encountered by some integrated software tool. An error is defined as any abnormal behavior of a tool that invalidates its result data thus disrupting the data flow within the integration workflow. The main requirementto the error handling mechanism implemented by the integration environment is to prevent abnormal termination of theentire workflow in case of missing intermediate results data. Error handling rules are formulated on the basic pattern level and on the level of a composite task that can combine several basic patterns as next level subtasks. The cases where workflow behavior may be different, depending on user's purposes, when an error takes place, and possible error handling op- tions that can be specified by the user are also noted in the work.

  1. Handling load with less stress

    NARCIS (Netherlands)

    Bansal, N.; Gamarnik, D.

    2006-01-01

    We study how the average performance of a system degrades as the load nears its peak capacity. We restrict our attention to the performance measures of average sojourn time and the large deviation rates of buffer overflow probabilities. We first show that for certain queueing systems, the average

  2. Asian oil demand

    International Nuclear Information System (INIS)

    Fesharaki, F.

    2005-01-01

    This conference presentation examined global oil market development and the role of Asian demand. It discussed plateau change versus cyclical movement in the global oil market; supply and demand issues of OPEC and non-OPEC oil; if high oil prices reduce demand; and the Asian oil picture in the global context. Asian oil demand has accounted for about 50 per cent of the global incremental oil market growth. The presentation provided data charts in graphical format on global and Asia-Pacific incremental oil demand from 1990-2005; Asia oil demand growth for selected nations; real GDP growth in selected Asian countries; and, Asia-Pacific oil production and net import requirements. It also included charts in petroleum product demand for Asia-Pacific, China, India, Japan, and South Korea. Other data charts included key indicators for China's petroleum sector; China crude production and net oil import requirements; China's imports and the share of the Middle East; China's oil exports and imports; China's crude imports by source for 2004; China's imports of main oil products for 2004; India's refining capacity; India's product balance for net-imports and net-exports; and India's trade pattern of oil products. tabs., figs

  3. LACIE data-handling techniques

    Science.gov (United States)

    Waits, G. H. (Principal Investigator)

    1979-01-01

    Techniques implemented to facilitate processing of LANDSAT multispectral data between 1975 and 1978 are described. The data that were handled during the large area crop inventory experiment and the storage mechanisms used for the various types of data are defined. The overall data flow, from the placing of the LANDSAT orders through the actual analysis of the data set, is discussed. An overview is provided of the status and tracking system that was developed and of the data base maintenance and operational task. The archiving of the LACIE data is explained.

  4. The handling of radiation accidents

    International Nuclear Information System (INIS)

    Macdonald, H.F.; Orchard, H.C.; Walker, C.W.

    1977-04-01

    Some of the more interesting and important contributions to a recent International Symposium on the Handling of Radiation Accidents are discussed and personal comments on many of the papers presented are included. The principal conclusion of the Symposium was that although the nuclear industry has an excellent safety record, there is no room for complacency. Continuing attention to emergency planning and exercising are essential in order to maintain this position. A full list of the papers presented at the Symposium is included as an Appendix. (author)

  5. Demand response scheme based on lottery-like rebates

    KAUST Repository

    Schwartz, Galina A.; Tembine, Hamidou; Amin, Saurabh; Sastry, S. Shankar

    2014-01-01

    In this paper, we develop a novel mechanism for reducing volatility of residential demand for electricity. We construct a reward-based (rebate) mechanism that provides consumers with incentives to shift their demand to off-peak time. In contrast to most other mechanisms proposed in the literature, the key feature of our mechanism is its modest requirements on user preferences, i.e., it does not require exact knowledge of user responsiveness to rewards for shifting their demand from the peak to the off-peak time. Specifically, our mechanism utilizes a probabilistic reward structure for users who shift their demand to the off-peak time, and is robust to incomplete information about user demand and/or risk preferences. We approach the problem from the public good perspective, and demonstrate that the mechanism can be implemented via lottery-like schemes. Our mechanism permits to reduce the distribution losses, and thus improve efficiency of electricity distribution. Finally, the mechanism can be readily incorporated into the emerging demand response schemes (e.g., the time-of-day pricing, and critical peak pricing schemes), and has security and privacy-preserving properties.

  6. Demand response scheme based on lottery-like rebates

    KAUST Repository

    Schwartz, Galina A.

    2014-08-24

    In this paper, we develop a novel mechanism for reducing volatility of residential demand for electricity. We construct a reward-based (rebate) mechanism that provides consumers with incentives to shift their demand to off-peak time. In contrast to most other mechanisms proposed in the literature, the key feature of our mechanism is its modest requirements on user preferences, i.e., it does not require exact knowledge of user responsiveness to rewards for shifting their demand from the peak to the off-peak time. Specifically, our mechanism utilizes a probabilistic reward structure for users who shift their demand to the off-peak time, and is robust to incomplete information about user demand and/or risk preferences. We approach the problem from the public good perspective, and demonstrate that the mechanism can be implemented via lottery-like schemes. Our mechanism permits to reduce the distribution losses, and thus improve efficiency of electricity distribution. Finally, the mechanism can be readily incorporated into the emerging demand response schemes (e.g., the time-of-day pricing, and critical peak pricing schemes), and has security and privacy-preserving properties.

  7. Uranium supply and demand

    International Nuclear Information System (INIS)

    1984-05-01

    This report covers the period 1983 to 1995. It draws together the industry's latest views on future trends in supply and demand, and sets them in their historical context. It devotes less discussion than its predecessors to the technical influences underpinning the Institute's supply and demand forecasts, and more to the factors which influence the market behaviour of the industry's various participants. As the last decade has clearly shown, these latter influences can easily be overlooked when undue attention is given to physical imbalances between supply and demand. (author)

  8. On energy demand

    International Nuclear Information System (INIS)

    Haefele, W.

    1977-01-01

    Since the energy crisis, a number of energy plans have been proposed, and almost all of these envisage some kind of energy demand adaptations or conservation measures, hoping thus to escape the anticipated problems of energy supply. However, there seems to be no clear explanation of the basis on which our foreseeable future energy problems could be eased. And in fact, a first attempt at a more exact definition of energy demand and its interaction with other objectives, such as economic ones, shows that it is a highly complex concept which we still hardly understand. The article explains in some detail why it is so difficult to understand energy demand

  9. 7 CFR 58.443 - Whey handling.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Whey handling. 58.443 Section 58.443 Agriculture... Procedures § 58.443 Whey handling. (a) Adequate sanitary facilities shall be provided for the handling of whey. If outside, necessary precautions shall be taken to minimize flies, insects and development of...

  10. Norwegian hydropower a valuable peak power source

    Energy Technology Data Exchange (ETDEWEB)

    Brekke, Hermod

    2010-07-01

    given on a possible increase of the Norwegian hydropower peak power production to meet the growing the European demand for peak power caused by the growing non stationary production from wind mills and ocean energy from waves and sea current. Also building of reversible pump turbine power plants will be discussed even if approximately 10% power will be consumed by loss in the pumping phase compared to direct use of the water from reservoirs. (Author)

  11. Sample handling for mass spectrometric proteomic investigations of human urine.

    Science.gov (United States)

    Petri, Anette Lykke; Høgdall, Claus; Christensen, Ib Jarle; Simonsen, Anja Hviid; T'jampens, Davy; Hellmann, Marja-Leena; Kjaer, Susanne Krüger; Fung, Eric T; Høgdall, Estrid

    2008-09-01

    Because of its non-invasive sample collection method, human urine is an attractive biological material both for discovering biomarkers and for use in future screening trials for different diseases. Before urine can be used for these applications, standardized protocols for sample handling that optimize protein stability are required. In this explorative study, we examine the influence of different urine collection methods, storage temperatures, storage times, and repetitive freeze-thaw procedures on the protein profiles obtained by surface-enhanced laser desorption/ionization time-of-flight mass spectrometry (SELDI-TOF-MS). Prospectively collected urine samples from 11 women were collected as either morning or midday specimens. The effects of storage temperature, time to freezing, and freeze-thaw cycles were assessed by calculating the number, intensity, and reproducibility of peaks visualized by SELDI-TOF-MS. On the CM10 array, 122 peaks were detected and 28 peaks were found to be significantly different between urine types, storage temperature and time to freezing. On the IMAC-Cu array, 65 peaks were detected and 1 peak was found to be significantly different according to time to freezing. No significant differences were demonstrated for freeze-thaw cycles. Optimal handling and storage conditions are necessary in clinical urine proteomic investigations. Collection of urine with a single and consistently performed protocol is needed to reduce analytical bias. Collecting only one urine type, which is stored for a limited period at 4°C until freezing at -80°C prior to analysis will provide the most stable profiles. Copyright © 2008 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  12. An Evaluation of Peak Finding for DVR Classification of Biological Data

    KAUST Repository

    Knoll, Aaron

    2012-01-01

    In medicine and the life sciences, volume data are frequently entropic, containing numerous features at different scales as well as significant noise from the scan source. Conventional transfer function approaches for direct volume rendering have difficulty handling such data, resulting in poor classification or undersampled rendering. Peak finding addresses issues in classifying noisy data by explicitly solving for isosurfaces at desired peaks in a transfer function. As a result, one can achieve better classification and visualization with fewer samples and correspondingly higher performance. This paper applies peak finding to several medical and biological data sets, particularly examining its potential in directly rendering unfiltered and unsegmented data.

  13. Cost Effectiveness and Demand for Medical Services among Rural ...

    African Journals Online (AJOL)

    With daily improvement in science and technology, the demand for modern medical services is becoming increasing. This is because modern medical services provide answers to some medical problems which could not be handled by traditional or other forms of medicine. Regrettably, these medical services receive low ...

  14. Energy efficient demand controlled ventilation in single family houses

    DEFF Research Database (Denmark)

    Nielsen, Toke Rammer; Drivsholm, Christian

    2010-01-01

    This paper presents a strategy for a simple demand controlled ventilation system for single family houses where all sensors and controls are located in the air handling unit. The strategy is based on sensing CO2-concentration and moisture content in the outdoor air and exhaust air. The CO2...

  15. Peak Operation of Cascaded Hydropower Plants Serving Multiple Provinces

    Directory of Open Access Journals (Sweden)

    Jianjian Shen

    2015-10-01

    Full Text Available The bulk hydropower transmission via trans-provincial and trans-regional power networks in China provides great operational flexibility to dispatch power resources between multiple power grids. This is very beneficial to alleviate the tremendous peak load pressure of most provincial power grids. This study places the focus on peak operations of cascaded hydropower plants serving multiple provinces under a regional connected AC/DC network. The objective is to respond to peak loads of multiple provincial power grids simultaneously. A two-stage search method is developed for this problem. In the first stage, a load reconstruction strategy is proposed to combine multiple load curves of power grids into a total load curve. The purpose is to deal with different load features in load magnitudes, peaks and valleys. A mutative-scale optimization method is then used to determine the generation schedules of hydropower plants. In the second stage, an exterior point search method is established to allocate the generation among multiple receiving power grids. This method produces an initial solution using the load shedding algorithm, and further improves it by iteratively coordinating the generation among different power grids. The proposed method was implemented to the operations of cascaded hydropower plants on Xin-Fu River and another on Hongshui River. The optimization results in two cases satisfied the peak demands of receiving provincial power grids. Moreover, the maximum load difference between peak and valley decreased 12.67% and 11.32% in Shanghai Power Grid (SHPG and Zhejiang Power Grid (ZJPG, exceeding by 4.85% and 6.72% those of the current operational method, respectively. The advantage of the proposed method in alleviating peak-shaving pressure is demonstrated.

  16. Measurements and simulations for peak electrical load reduction in cooling dominated climate

    International Nuclear Information System (INIS)

    Sadineni, Suresh B.; Boehm, Robert F.

    2012-01-01

    Peak electric demand due to cooling load in the Desert Southwest region of the US has been an issue for the electrical energy suppliers. To address this issue, a consortium has been formed between the University of Nevada Las Vegas, Pulte Homes (home builder) and NV Energy (local utility) in order to reduce the peak load by more than 65%. The implemented strategies that were used to accomplish that goal consist of energy efficiency in homes, onsite electricity generation through roof integrated PV, direct load control, and battery storage at the substation level. The simulation models developed using building energy analysis software were validated against measured data. The electrical energy demand for the upgraded home during peak period (1:00–7:00 PM) decreased by approximately 37% and 9% compared to a code standard home of the same size, due to energy efficiency and PV generation, respectively. The total decrease in electrical demand due to energy efficiency and PV generation during the peak period is 46%. Additionally, a 2.2 °C increase in thermostat temperature from 23.9 °C to 26.1 °C between 4:00 PM and 7:00 PM has further decreased the average demand during the peak period by 69% of demand from a standard home. -- Highlights: ► A study to demonstrate peak load reductions of 65% at the substation. ► A new residential energy efficient community named Villa Trieste is being developed. ► The peak demand from the homes has decreased by 37% through energy efficiency. ► A 1.8 kWp system along with energy efficiency measures decreased peak by 46%.

  17. Sizewell: UK power demand

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    The Sizewell Inquiry was about whether the next power stations to be built in the UK should be nuclear or coal and, if nuclear, PWRs or AGRs. During the period of the Inquiry forecasts of demand for electricity were low. Now, however, it seems that the forecast demand is much increased. This uncertainty in demand and the wide regional variations are examined in some detail. Facts and figures on electricity sales (area by area) are presented. Also the minutes of supply lost per consumer per year. These show that security of supply is also a problem. It is also shown that the way electricity is used has changed. Whilst electricity generation has been changing to large-scale, centralised power stations the demand patterns may make smaller scale, quickly-constructed units more sensible. The questions considered at the Sizewell Inquiry may, indeed, no longer be the right ones. (UK)

  18. A demanding market

    International Nuclear Information System (INIS)

    Thomas, M.

    1997-01-01

    The article relates to the oil and natural gas market, and it gives a survey of proved reserves at the end of 1996 worldwide. The long term trend of increasing world energy demand has seen a major rise during 1996 when global consumption grew by 3%. But worldwide demand, excluding the Former Soviet Union, shows this figure increasing further to 3.7% for the whole of last year according to statistics. 3 figs

  19. Maximum power demand cost

    International Nuclear Information System (INIS)

    Biondi, L.

    1998-01-01

    The charging for a service is a supplier's remuneration for the expenses incurred in providing it. There are currently two charges for electricity: consumption and maximum demand. While no problem arises about the former, the issue is more complicated for the latter and the analysis in this article tends to show that the annual charge for maximum demand arbitrarily discriminates among consumer groups, to the disadvantage of some [it

  20. Customers` response to residential peak-activated pricing. Evidence from a Japanese experiment; Peak taio ryokinka ni okeru kateiyo juyoka no fuka chosei kodo no bunseki. Kansetsu fuka seigyo jikken data wo mochiita kakaku koka no sokutei

    Energy Technology Data Exchange (ETDEWEB)

    Asano, H. [Central Research Institute of Electric Power Industry, Tokyo (Japan)

    1997-10-01

    Demand side management through a pricing mechanism, that is the indirect load control was experimented to analyze the pricing effect. When power consumption in indirect load control groups is compared between peak time band in weekdays in summer and off-the-peak time band, the power is less consumed when price gap is set than in a uniform charge time. When more number of persons is in home in daytime, room cooling is used in daytime including the peak band to adjust the demand. The substitution elasticity in price between demands in the peak time band and the off-the-peak time band is from about 0.06 to 0.07, which cannot be ignored. If the peak price is increased by four times, the demand in the peak band can be reduced by about 0.15 kW (when average power demand per household is assumed 0.75 kW). For room cooling devices, the first device is often installed in a living room and the second and further units in individual rooms such as bed rooms. The more the number of device, the higher the possibility that the use time band is outside the peak time band. This indirect load control experiment is a field test related to the peak-activated pricing for small power users, by which the users` behavior against the pricing effect was identified quantitatively. 5 refs., 1 fig., 8 tabs.

  1. Modelling of demand response and market power

    International Nuclear Information System (INIS)

    Kristoffersen, B.B.; Donslund, B.; Boerre Eriksen, P.

    2004-01-01

    Demand-side flexibility and demand response to high prices are prerequisites for the proper functioning of the Nordic power market. If the consumers are unwilling to respond to high prices, the market may fail the clearing, and this may result in unwanted forced demand disconnections. Being the TSO of Western Denmark, Eltra is responsible of both security of supply and the design of the power market within its area. On this basis, Eltra has developed a new mathematical model tool for analysing the Nordic wholesale market. The model is named MARS (MARket Simulation). The model is able to handle hydropower and thermal production, nuclear power and wind power. Production, demand and exchanges modelled on an hourly basis are new important features of the model. The model uses the same principles as Nord Pool (The Nordic Power Exchange), including the division of the Nordic countries into price areas. On the demand side, price elasticity is taken into account and described by a Cobb-Douglas function. Apart from simulating perfect competition markets, particular attention has been given to modelling imperfect market conditions, i.e. exercise of market power on the supply side. Market power is simulated by using game theory, including the Nash equilibrium concept. The paper gives a short description of the MARS model. Besides, focus is on the application of the model in order to illustrate the importance of demand response in the Nordic market. Simulations with different values of demand elasticity are compared. Calculations are carried out for perfect competition and for the situation in which market power is exercised by the large power producers in the Nordic countries (oligopoly). (au)

  2. Chinese energy demand falls back

    Energy Technology Data Exchange (ETDEWEB)

    Smil, V.

    1977-10-01

    China's growth in energy demand and production declined in 1976, partly because of difficulty of sustaining a rapid 5.4 percent growth and partly because of the disruptions caused by a major earthquake and the deaths of Mao Tse-Tung and Chou En-Lai. The earthquake, which damaged all mines, the power station, refineries, and transportation lines in the Tangshan area, has had serious economic consequences. The failure to back up a growing coal industry with adequate investments and mechanization was recognized in 1975 and prompted a 10-year modernization program. Progress has been made with new mine shafts, pulverizing equipment, and the use of small mines for local industries. Oil and gas production increased after the discovery of new fields and the use of new technology in the hydrocarbon industries. Ports and terminal facilities to handle large tankers will increase China's oil export traffic. Electricity generation increased with new power facilities, although China's dependence on human and animal power is still a major factor. Changes in energy consumption patterns are developing, but industry still represents 50 percent and transportation less than 10 percent. (DCK)

  3. Safety of Cargo Aircraft Handling Procedure

    Directory of Open Access Journals (Sweden)

    Daniel Hlavatý

    2017-07-01

    Full Text Available The aim of this paper is to get acquainted with the ways how to improve the safety management system during cargo aircraft handling. The first chapter is dedicated to general information about air cargo transportation. This includes the history or types of cargo aircraft handling, but also the means of handling. The second part is focused on detailed description of cargo aircraft handling, including a description of activities that are performed before and after handling. The following part of this paper covers a theoretical interpretation of safety, safety indicators and legislative provisions related to the safety of cargo aircraft handling. The fourth part of this paper analyzes the fault trees of events which might occur during handling. The factors found by this analysis are compared with safety reports of FedEx. Based on the comparison, there is a proposal on how to improve the safety management in this transportation company.

  4. Transfer Area Mechanical Handling Calculation

    International Nuclear Information System (INIS)

    Dianda, B.

    2004-01-01

    This calculation is intended to support the License Application (LA) submittal of December 2004, in accordance with the directive given by DOE correspondence received on the 27th of January 2004 entitled: ''Authorization for Bechtel SAX Company L.L. C. to Include a Bare Fuel Handling Facility and Increased Aging Capacity in the License Application, Contract Number DE-AC--28-01R W12101'' (Arthur, W.J., I11 2004). This correspondence was appended by further Correspondence received on the 19th of February 2004 entitled: ''Technical Direction to Bechtel SAIC Company L.L. C. for Surface Facility Improvements, Contract Number DE-AC--28-OIRW12101; TDL No. 04-024'' (BSC 2004a). These documents give the authorization for a Fuel Handling Facility to be included in the baseline. The purpose of this calculation is to establish preliminary bounding equipment envelopes and weights for the Fuel Handling Facility (FHF) transfer areas equipment. This calculation provides preliminary information only to support development of facility layouts and preliminary load calculations. The limitations of this preliminary calculation lie within the assumptions of section 5 , as this calculation is part of an evolutionary design process. It is intended that this calculation is superseded as the design advances to reflect information necessary to support License Application. The design choices outlined within this calculation represent a demonstration of feasibility and may or may not be included in the completed design. This calculation provides preliminary weight, dimensional envelope, and equipment position in building for the purposes of defining interface variables. This calculation identifies and sizes major equipment and assemblies that dictate overall equipment dimensions and facility interfaces. Sizing of components is based on the selection of commercially available products, where applicable. This is not a specific recommendation for the future use of these components or their

  5. Integrated Platform for Automated Sustainable Demand Response in Smart Grids

    Energy Technology Data Exchange (ETDEWEB)

    Zois, Vassilis [Univ. of Southern California, Los Angeles, CA (United States). Dept. of Computer Science; Frincu, Marc [Univ. of Southern California, Los Angeles, CA (United States). Dept. of Electrical Engineering; Prasanna, Viktor K. [Univ. of Southern California, Los Angeles, CA (United States). Dept. of Electrical Engineering

    2014-10-08

    Demand Response(DR) is a common practice used by utility providers to regulate energy demand. It is used at periods of high demand to minimize the peak to average consumption ratio. Several methods have been Demand Response(DR) is a common praon using information about the baseline consumption and the consumption during DR. Our goal is to provide a sustainable reduction to ensure the elimination of peaks in demand. The proposed system includes an adaptation mechanism for when the provided solution does not meet the DR requirements. We conducted a series of experiments using consumption data from a real life micro grid to evaluate the efficiency as well as the robustness of our solution.

  6. Dynamic peak demand pricing under uncertainty in an agent-based retail energy market

    NARCIS (Netherlands)

    M. Ansarin (Mohammad); W. Ketter (Wolfgang); J. Collins (John)

    2016-01-01

    textabstractFor a transition to a sustainable energy future, smart grids must adapt to the mass introduction of renewable energy sources and their inherent unpredictability. The Power TAC competition is a simulation of distribution grid market dynamics with autonomous retail broker agents. It seeks

  7. Transportation cost of nuclear off-peak power for hydrogen production based on water electrolysis

    International Nuclear Information System (INIS)

    Shimizu, Saburo; Ueno, Shuichi

    2004-01-01

    The paper describes transportation cost of the nuclear off-peak power for a hydrogen production based on water electrolysis in Japan. The power could be obtainable by substituting hydropower and/or fossil fueled power supplying peak and middle demands with nuclear power. The transportation cost of the off-peak power was evaluated to be 1.42 yen/kWh when an electrolyser receives the off-peak power from a 6kV distribution wire. Marked reduction of the cost was caused by the increase of the capacity factor. (author)

  8. CANISTER HANDLING FACILITY DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    J.F. Beesley

    2005-04-21

    The purpose of this facility description document (FDD) is to establish requirements and associated bases that drive the design of the Canister Handling Facility (CHF), which will allow the design effort to proceed to license application. This FDD will be revised at strategic points as the design matures. This FDD identifies the requirements and describes the facility design, as it currently exists, with emphasis on attributes of the design provided to meet the requirements. This FDD is an engineering tool for design control; accordingly, the primary audience and users are design engineers. This FDD is part of an iterative design process. It leads the design process with regard to the flowdown of upper tier requirements onto the facility. Knowledge of these requirements is essential in performing the design process. The FDD follows the design with regard to the description of the facility. The description provided in this FDD reflects the current results of the design process.

  9. Bulk handling benefits from ICT

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-11-15

    The efficiency and accuracy of bulk handling is being improved by the range of management information systems and services available today. As part of the program to extend Richards Bay Coal Terminal, Siemens is installing a manufacturing execution system which coordinates and monitors all movements of raw materials. The article also reports recent developments by AXSMarine, SunGuard Energy, Fuelworx and Railworx in providing integrated tools for tracking, managing and optimising solid/liquid fuels and rail car maintenance activities. QMASTOR Ltd. has secured a contract with Anglo Coal Australia to provide its Pit to Port.net{reg_sign} and iFuse{reg_sign} software systems across all their Australians sites, to include pit-to-product stockpile management. 2 figs.

  10. Handling and transport problems (1960)

    International Nuclear Information System (INIS)

    Pomarola, J.; Savouyaud, J.

    1960-01-01

    I. The handling and transport of radioactive wastes involves the danger of irradiation and contamination. It is indispensable: - to lay down a special set of rules governing the removal and transport of wastes within centres or from one centre to another; - to give charge of this transportation to a group containing teams of specialists. The organisation, equipment and output of these teams is being examined. II. Certain materials are particularly dangerous to transport, and for these special vehicles and fixed installations are necessary. This is the case especially for the evacuation of very active liquids. A transport vehicle is described, consisting of a trailer tractor and a recipient holding 500 litres of liquid of which the activity can reach 1000 C/l; the decanting operation, the route to be followed by the vehicle, and the precautions taken are also described. (author) [fr

  11. CANISTER HANDLING FACILITY DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    Beesley. J.F.

    2005-01-01

    The purpose of this facility description document (FDD) is to establish requirements and associated bases that drive the design of the Canister Handling Facility (CHF), which will allow the design effort to proceed to license application. This FDD will be revised at strategic points as the design matures. This FDD identifies the requirements and describes the facility design, as it currently exists, with emphasis on attributes of the design provided to meet the requirements. This FDD is an engineering tool for design control; accordingly, the primary audience and users are design engineers. This FDD is part of an iterative design process. It leads the design process with regard to the flowdown of upper tier requirements onto the facility. Knowledge of these requirements is essential in performing the design process. The FDD follows the design with regard to the description of the facility. The description provided in this FDD reflects the current results of the design process

  12. Fuel Handling Facility Description Document

    International Nuclear Information System (INIS)

    M.A. LaFountain

    2005-01-01

    The purpose of the facility description document (FDD) is to establish the requirements and their bases that drive the design of the Fuel Handling Facility (FHF) to allow the design effort to proceed to license application. This FDD is a living document that will be revised at strategic points as the design matures. It identifies the requirements and describes the facility design as it currently exists, with emphasis on design attributes provided to meet the requirements. This FDD was developed as an engineering tool for design control. Accordingly, the primary audience and users are design engineers. It leads the design process with regard to the flow down of upper tier requirements onto the facility. Knowledge of these requirements is essential to performing the design process. It trails the design with regard to the description of the facility. This description is a reflection of the results of the design process to date

  13. Data Handling and Parameter Estimation

    DEFF Research Database (Denmark)

    Sin, Gürkan; Gernaey, Krist

    2016-01-01

    ,engineers, and professionals. However, it is also expected that they will be useful both for graduate teaching as well as a stepping stone for academic researchers who wish to expand their theoretical interest in the subject. For the models selected to interpret the experimental data, this chapter uses available models from...... literature that are mostly based on the ActivatedSludge Model (ASM) framework and their appropriate extensions (Henze et al., 2000).The chapter presents an overview of the most commonly used methods in the estimation of parameters from experimental batch data, namely: (i) data handling and validation, (ii......Modelling is one of the key tools at the disposal of modern wastewater treatment professionals, researchers and engineers. It enables them to study and understand complex phenomena underlying the physical, chemical and biological performance of wastewater treatment plants at different temporal...

  14. Cask system design guidance for robotic handling

    International Nuclear Information System (INIS)

    Griesmeyer, J.M.; Drotning, W.D.; Morimoto, A.K.; Bennett, P.C.

    1990-10-01

    Remote automated cask handling has the potential to reduce both the occupational exposure and the time required to process a nuclear waste transport cask at a handling facility. The ongoing Advanced Handling Technologies Project (AHTP) at Sandia National Laboratories is described. AHTP was initiated to explore the use of advanced robotic systems to perform cask handling operations at handling facilities for radioactive waste, and to provide guidance to cask designers regarding the impact of robotic handling on cask design. The proof-of-concept robotic systems developed in AHTP are intended to extrapolate from currently available commercial systems to the systems that will be available by the time that a repository would be open for operation. The project investigates those cask handling operations that would be performed at a nuclear waste repository facility during cask receiving and handling. The ongoing AHTP indicates that design guidance, rather than design specification, is appropriate, since the requirements for robotic handling do not place severe restrictions on cask design but rather focus on attention to detail and design for limited dexterity. The cask system design features that facilitate robotic handling operations are discussed, and results obtained from AHTP design and operation experience are summarized. The application of these design considerations is illustrated by discussion of the robot systems and their operation on cask feature mock-ups used in the AHTP project. 11 refs., 11 figs

  15. How does economic theory explain the Hubbert peak oil model?

    International Nuclear Information System (INIS)

    Reynes, F.; Okullo, S.; Hofkes, M.

    2010-01-01

    The aim of this paper is to provide an economic foundation for bell shaped oil extraction trajectories, consistent with Hubbert's peak oil model. There are several reasons why it is important to get insight into the economic foundations of peak oil. As production decisions are expected to depend on economic factors, a better comprehension of the economic foundations of oil extraction behaviour is fundamental to predict production and price over the coming years. The investigation made in this paper helps us to get a better understanding of the different mechanisms that may be at work in the case of OPEC and non-OPEC producers. We show that profitability is the main driver behind production plans. Changes in profitability due to divergent trajectories between costs and oil price may give rise to a Hubbert production curve. For this result we do not need to introduce a demand or an exploration effect as is generally assumed in the literature.

  16. Maximizing utilization of sport halls during peak hours

    DEFF Research Database (Denmark)

    Iversen, Evald Bundgård; Forsberg, Peter

    the number of participants 7.5 persons higher pr. activity compared to club activities. This implies that clubs during peak hours could include more participants. Another possibility to increase utilization is if the management of sport facilities forced sport clubs and other organisers to adapt...... their activities to a smaller amount of floor space, which would make it possible to have more than one activity on the floor at the same time. Hence, to achieve better utilization during prime time, further analysis and research could focus on how activities in sport halls can be adapted to include more......BACKGROUNDDuring peak hours (4.30pm-8pm) demand for timeslots in sport halls in Denmark are high and there are few timeslots available. Further, focus on how public resources are spent most efficient is increasing (Iversen, 2013). This makes it interesting to analyse how utilization could...

  17. Climate Change Impacts on Peak Electricity Consumption: US vs. Europe.

    Science.gov (United States)

    Auffhammer, M.

    2016-12-01

    It has been suggested that climate change impacts on the electric sector will account for the majority of global economic damages by the end of the current century and beyond. This finding is at odds with the relatively modest increase in climate driven impacts on consumption. Comprehensive high frequency load balancing authority level data have not been used previously to parameterize the relationship between electric demand and temperature for any major economy. Using statistical models we analyze multi-year data from load balancing authorities in the United States of America and the European Union, which are responsible for more than 90% of the electricity delivered to residential, industrial, commercial and agricultural customers. We couple the estimated response functions between total daily consumption and daily peak load with an ensemble of downscaled GCMs from the CMIP5 archive to simulate climate change driven impacts on both outcomes. We show moderate and highly spatially heterogeneous changes in consumption. The results of our peak load simulations, however, suggest significant changes in the intensity and frequency of peak events throughout the United States and Europe. As the electricity grid is built to endure maximum load, which usually occurs on the hottest day of the year, our findings have significant implications for the construction of costly peak generating and transmission capacity.

  18. Demand management implementation in Southeast Asia

    Energy Technology Data Exchange (ETDEWEB)

    Tanaboriboon, Y.

    1995-12-31

    The need to apply transportation system management, to developing countries is urgent. Attempts to alleviate severe traffic congestion in their metropolises have so far failed to provide adequate solutions. The countries are faced with many difficulties because of the lack of sufficient financial resources together with their complex internal administrative and political problems. They are incapable of providing sufficient road space to cope with the escalating demand in private automobiles. This has led to excessive delays in urban traveling, environmental pollution problems, decline of road-based public transit services and deterioration of the quality of life in these metropolises. Demand management, in use for decades in the Western world, has also been recognized in Singapore`s famous area licensing scheme (ALS) making other Southeast Asian Metropolises aware of its advantages as an alternative in solving their chaotic traffic problems. However, realization is far different from implementation and still many metropolises are not able to apply the technique. Singapore and Thailand, two leaders among many other Southeast Asian regions in economics, tourism, trade and industry handle their problems far differently, especially the traffic congestion problem. While a number of demand management schemes have been implemented successfully in Singapore since 1975, Bangkok is still struggling to implement such measures to alleviate severe traffic congestion problems. This article intends to high light the successful practices and unsuccessful attempts of demand management techniques applied in Singapore and Bangkok.

  19. Demand Modelling in Telecommunications

    Directory of Open Access Journals (Sweden)

    M. Chvalina

    2009-01-01

    Full Text Available This article analyses the existing possibilities for using Standard Statistical Methods and Artificial Intelligence Methods for a short-term forecast and simulation of demand in the field of telecommunications. The most widespread methods are based on Time Series Analysis. Nowadays, approaches based on Artificial Intelligence Methods, including Neural Networks, are booming. Separate approaches will be used in the study of Demand Modelling in Telecommunications, and the results of these models will be compared with actual guaranteed values. Then we will examine the quality of Neural Network models. 

  20. DemandStat

    International Nuclear Information System (INIS)

    2003-01-01

    DemandStat is an accurate and up-to-date international statistics database dedicated to energy demand, with an unrivaled level of details for powerful market analysis. It provides detailed consumption statistics (30 sectors) on all energies, detailed 2003 data and historical annual data since 1970, frequent data revision and update (2 updates options), 150 data sources gathered and expertized, all data on a single database Consistent and homogeneous statistics, in line with all major data providers (IEA, Eurostat, ADB, OLADE, etc), no ruptures in time-series with easy request building and data analysis and reactive support from data experts. (A.L.B.)

  1. Education on Demand

    DEFF Research Database (Denmark)

    Boysen, Lis; Hende, Merete

    2015-01-01

    Dette notat beskriver nogle af resultaterne fra programmet "Education on Demand' i projektet Det erhvervsrettede Uddannelseslaboratorium. Programmet har haft fokus på udfordringer og forandringsbehov i uddannelsesinstitutioner og -systemet. Herunder har det beskæftiget sig særligt med de to temat......Dette notat beskriver nogle af resultaterne fra programmet "Education on Demand' i projektet Det erhvervsrettede Uddannelseslaboratorium. Programmet har haft fokus på udfordringer og forandringsbehov i uddannelsesinstitutioner og -systemet. Herunder har det beskæftiget sig særligt med de...

  2. Implementing peak load reduction algorithms for household electrical appliances

    International Nuclear Information System (INIS)

    Dlamini, Ndumiso G.; Cromieres, Fabien

    2012-01-01

    Considering household appliance automation for reduction of household peak power demand, this study explored aspects of the interaction between household automation technology and human behaviour. Given a programmable household appliance switching system, and user-reported appliance use times, we simulated the load reduction effectiveness of three types of algorithms, which were applied at both the single household level and across all 30 households. All three algorithms effected significant load reductions, while the least-to-highest potential user inconvenience ranking was: coordinating the timing of frequent intermittent loads (algorithm 2); moving period-of-day time-flexible loads to off-peak times (algorithm 1); and applying short-term time delays to avoid high peaks (algorithm 3) (least accommodating). Peak reduction was facilitated by load interruptibility, time of use flexibility and the willingness of users to forgo impulsive appliance use. We conclude that a general factor determining the ability to shift the load due to a particular appliance is the time-buffering between the service delivered and the power demand of an appliance. Time-buffering can be ‘technologically inherent’, due to human habits, or realised by managing user expectations. There are implications for the design of appliances and home automation systems. - Highlights: ► We explored the interaction between appliance automation and human behaviour. ► There is potential for considerable load shifting of household appliances. ► Load shifting for load reduction is eased with increased time buffering. ► Design, human habits and user expectations all influence time buffering. ► Certain automation and appliance design features can facilitate load shifting.

  3. Development of commercial robots for radwaste handling

    International Nuclear Information System (INIS)

    Colborn, K.A.

    1988-01-01

    The cost and dose burden associated with low level radwaste handling activities is a matter of increasing concern to the commercial nuclear power industry. This concern is evidenced by the fact that many utilities have begun to revaluate waste generation, handling, and disposal activities at their plants in an effort to improve their overall radwaste handling operations. This paper reports on the project Robots for Radwaste Handling, to identify the potential of robots to improve radwaste handling operations. The project has focussed on the potential of remote or automated technology to improve well defined, recognizable radwaste operations. The project focussed on repetitive, low skill level radwaste handling and decontamination tasks which involve significant radiation exposure

  4. Passive radio frequency peak power multiplier

    Science.gov (United States)

    Farkas, Zoltan D.; Wilson, Perry B.

    1977-01-01

    Peak power multiplication of a radio frequency source by simultaneous charging of two high-Q resonant microwave cavities by applying the source output through a directional coupler to the cavities and then reversing the phase of the source power to the coupler, thereby permitting the power in the cavities to simultaneously discharge through the coupler to the load in combination with power from the source to apply a peak power to the load that is a multiplication of the source peak power.

  5. Sequence trajectory generation for garment handling systems

    OpenAIRE

    Liu, Honghai; Lin, Hua

    2008-01-01

    This paper presents a novel generic approach to the planning strategy of garment handling systems. An assumption is proposed to separate the components of such systems into a component for intelligent gripper techniques and a component for handling planning strategies. Researchers can concentrate on one of the two components first, then merge the two problems together. An algorithm is addressed to generate the trajectory position and a clothes handling sequence of clothes partitions, which ar...

  6. Enclosure for handling high activity materials

    International Nuclear Information System (INIS)

    Jimeno de Osso, F.

    1977-01-01

    One of the most important problems that are met at the laboratories producing and handling radioisotopes is that of designing, building and operating enclosures suitable for the safe handling of active substances. With this purpose in mind, an enclosure has been designed and built for handling moderately high activities under a shielding made of 150 mm thick lead. In this report a description is given of those aspects that may be of interest to people working in this field. (Author)

  7. Enclosure for handling high activity materials abstract

    International Nuclear Information System (INIS)

    Jimeno de Osso, F.; Dominguez Rodriguez, G.; Cruz Castillo, F. de la; Rodriguez Esteban, A.

    1977-01-01

    One of the most important problems that are met at the laboratories producing and handling radioisotopes is that of designing, building and operating enclosures suitable for the safe handling of active substances. With that purpose in mind, an enclosure has been designed and built for handling moderately high activities under a shielding made of 150 mm thick lead. A description is given of those aspects that may be of interest to people working in this field. (author) [es

  8. Scheduling of outbound luggage handling at airports

    DEFF Research Database (Denmark)

    Barth, Torben C.; Pisinger, David

    2012-01-01

    This article considers the outbound luggage handling problem at airports. The problem is to assign handling facilities to outbound flights and decide about the handling start time. This dynamic, near real-time assignment problem is part of the daily airport operations. Quality, efficiency......). Another solution method is a decomposition approach. The problem is divided into different subproblems and solved in iterative steps. The different solution approaches are tested on real world data from Frankfurt Airport....

  9. ATA diagnostic data handling system: an overview

    International Nuclear Information System (INIS)

    Chambers, F.W.; Kallman, J.; McDonald, J.; Slominski, M.

    1984-01-01

    The functions to be performed by the ATA diagnostic data handling system are discussed. The capabilities of the present data acquisition system (System 0) are presented. The goals for the next generation acquisition system (System 1), currently under design, are discussed. Facilities on the Octopus system for data handling are reviewed. Finally, we discuss what has been learned about diagnostics and computer based data handling during the past year

  10. Enclosure for handling high activity materials

    Energy Technology Data Exchange (ETDEWEB)

    Jimeno de Osso, F

    1977-07-01

    One of the most important problems that are met at the laboratories producing and handling radioisotopes is that of designing, building and operating enclosures suitable for the safe handling of active substances. With this purpose in mind, an enclosure has been designed and built for handling moderately high activities under a shielding made of 150 mm thick lead. In this report a description is given of those aspects that may be of interest to people working in this field. (Author)

  11. Causality in demand

    DEFF Research Database (Denmark)

    Nielsen, Max; Jensen, Frank; Setälä, Jari

    2011-01-01

    to fish demand. On the German market for farmed trout and substitutes, it is found that supply sources, i.e. aquaculture and fishery, are not the only determinant of causality. Storing, tightness of management and aggregation level of integrated markets might also be important. The methodological...

  12. Oil supply and demand

    Energy Technology Data Exchange (ETDEWEB)

    Babusiaux, D

    2004-07-01

    Following the military intervention in Iraq, it is taking longer than expected for Iraqi exports to make a comeback on the market. Demand is sustained by economic growth in China and in the United States. OPEC is modulating production to prevent inventory build-up. Prices have stayed high despite increased production by non-OPEC countries, especially Russia. (author)

  13. Oil supply and demand

    Energy Technology Data Exchange (ETDEWEB)

    Rech, O

    2006-07-01

    The year 2004 saw a change in the oil market paradigm that was confirmed in 2005. Despite a calmer geopolitical context, prices continued to rise vigorously. Driven by world demand, they remain high as a result of the saturation of production and refining capacity. The market is still seeking its new equilibrium. (author)

  14. Oil supply and demand

    International Nuclear Information System (INIS)

    Rech, O.

    2006-01-01

    The year 2004 saw a change in the oil market paradigm that was confirmed in 2005. Despite a calmer geopolitical context, prices continued to rise vigorously. Driven by world demand, they remain high as a result of the saturation of production and refining capacity. The market is still seeking its new equilibrium. (author)

  15. The demand for euros

    NARCIS (Netherlands)

    Arnold, I.J.M.; Roelands, S.

    2010-01-01

    This paper investigates the demand for euros using panel data for 10 euro area countries covering the period from 1999 to 2008. Monetary aggregates are constructed to ensure that money is a national concept by excluding deposits owned by non-residents and including external deposits owned by

  16. Oil supply and demand

    International Nuclear Information System (INIS)

    Babusiaux, D.

    2004-01-01

    Following the military intervention in Iraq, it is taking longer than expected for Iraqi exports to make a comeback on the market. Demand is sustained by economic growth in China and in the United States. OPEC is modulating production to prevent inventory build-up. Prices have stayed high despite increased production by non-OPEC countries, especially Russia. (author)

  17. Oil supply and demand

    International Nuclear Information System (INIS)

    Rech, O.

    2004-01-01

    World oil demand, driven by economic development in China, posted the highest growth rate in 20 years. In a context of geopolitical uncertainty, prices are soaring, encouraged by low inventory and the low availability of residual production capacity. Will 2004 bring a change in the oil market paradigm? (author)

  18. Textbook Factor Demand Curves.

    Science.gov (United States)

    Davis, Joe C.

    1994-01-01

    Maintains that teachers and textbook graphics follow the same basic pattern in illustrating changes in demand curves when product prices increase. Asserts that the use of computer graphics will enable teachers to be more precise in their graphic presentation of price elasticity. (CFR)

  19. Oil supply and demand

    Energy Technology Data Exchange (ETDEWEB)

    Rech, O

    2004-07-01

    World oil demand, driven by economic development in China, posted the highest growth rate in 20 years. In a context of geopolitical uncertainty, prices are soaring, encouraged by low inventory and the low availability of residual production capacity. Will 2004 bring a change in the oil market paradigm? (author)

  20. Revisiting the Correlations of Peak Luminosity with Spectral Lag and Peak Energy of the Observed Gamma-ray Bursts

    Directory of Open Access Journals (Sweden)

    Yun-A Jo

    2016-12-01

    Full Text Available An analysis of light curves and spectra of observed gamma-ray bursts in gamma-ray ranges is frequently demanded because the prompt emission contains immediate details regarding the central engine of gamma-ray bursts (GRBs. We have revisited the relationship between the collimation-corrected peak luminosity and the spectral lag, investigating the lag-luminosity relationships in great detail by focusing on spectral lags resulting from all possible combinations of channels. Firstly, we compiled the opening angle data and demonstrated that the distribution of opening angles of 205 long GRBs is represented by a double Gaussian function having maxima at ~ 0.1 and ~ 0.3 radians. We confirmed that the peak luminosity and the spectral lag are anti-correlated, both in the observer frame and in the source frame. We found that, in agreement with our previous conclusion, the correlation coefficient improves significantly in the source frame. It should be noted that spectral lags involving channel 2 (25-50 keV yield high correlation coefficients, where Swift/Burst Alert Telescope (BAT has four energy channels (channel 1: 15-25 keV, channel 2: 25-50 keV, channel 3: 50-100 keV, channel 4: 100-200 keV. We also found that peak luminosity is positively correlated with peak energy.

  1. The geomorphic structure of the runoff peak

    Directory of Open Access Journals (Sweden)

    R. Rigon

    2011-06-01

    Full Text Available This paper develops a theoretical framework to investigate the core dependence of peak flows on the geomorphic properties of river basins. Based on the theory of transport by travel times, and simple hydrodynamic characterization of floods, this new framework invokes the linearity and invariance of the hydrologic response to provide analytical and semi-analytical expressions for peak flow, time to peak, and area contributing to the peak runoff. These results are obtained for the case of constant-intensity hyetograph using the Intensity-Duration-Frequency (IDF curves to estimate extreme flow values as a function of the rainfall return period. Results show that, with constant-intensity hyetographs, the time-to-peak is greater than rainfall duration and usually shorter than the basin concentration time. Moreover, the critical storm duration is shown to be independent of rainfall return period as well as the area contributing to the flow peak. The same results are found when the effects of hydrodynamic dispersion are accounted for. Further, it is shown that, when the effects of hydrodynamic dispersion are negligible, the basin area contributing to the peak discharge does not depend on the channel velocity, but is a geomorphic propriety of the basin. As an example this framework is applied to three watersheds. In particular, the runoff peak, the critical rainfall durations and the time to peak are calculated for all links within a network to assess how they increase with basin area.

  2. [A peak recognition algorithm designed for chromatographic peaks of transformer oil].

    Science.gov (United States)

    Ou, Linjun; Cao, Jian

    2014-09-01

    In the field of the chromatographic peak identification of the transformer oil, the traditional first-order derivative requires slope threshold to achieve peak identification. In terms of its shortcomings of low automation and easy distortion, the first-order derivative method was improved by applying the moving average iterative method and the normalized analysis techniques to identify the peaks. Accurate identification of the chromatographic peaks was realized through using multiple iterations of the moving average of signal curves and square wave curves to determine the optimal value of the normalized peak identification parameters, combined with the absolute peak retention times and peak window. The experimental results show that this algorithm can accurately identify the peaks and is not sensitive to the noise, the chromatographic peak width or the peak shape changes. It has strong adaptability to meet the on-site requirements of online monitoring devices of dissolved gases in transformer oil.

  3. Electricity demand in Tunisia

    International Nuclear Information System (INIS)

    Gam, Imen; Ben Rejeb, Jaleleddine

    2012-01-01

    This paper examines the global electricity demand in Tunisia as a function of gross domestic product in constant price, the degree of urbanization, the average annual temperature, and the real electricity price per Kwh. This demand will be examined employing annual data over a period spanning almost thirty one years from 1976 to 2006. A long run relationship between the variables under consideration is determined using the Vector Autoregressive Regression. The empirical results suggest that the electricity demand in Tunisia is sensitive to its past value, any changes in gross domestic product and electricity price. The electricity price effects have a negative impact on long-run electricity consumption. However, the gross domestic product and the past value of electricity consumption have a positive effect. Moreover, the causality test reveals a unidirectional relationship between price and electricity consumption. Our empirical findings are effective to policy makers to maintain the electricity consumption in Tunisia by using the appropriate strategy. - Highlights: ► This paper examined the electricity demand in Tunisia in the long-run. ► The empirical analysis revealed that in the long-run the electricity demand is affected by changes in its past value, GDP in constant price and real electricity price. ► There is a unidirectional relationship between price and electricity consumption, that is to say, that the electricity price causes the consumption. ► Those results suggest that a pricing policy can be an effective instrument to rationalize the electricity consumption in Tunisia in the long-run.

  4. Remote, under-sodium fuel handling experience at EBR-II

    International Nuclear Information System (INIS)

    King, R.W.; Planchon, H.P.

    1995-01-01

    The EBR-II is a pool-type design; the reactor fuel handling components and entire primary-sodium coolant system are submerged in the primary tank, which is 26 feet in diameter, 26 feet high, and contains 86,000 gallons of sodium. Since the reactor is submerged in sodium, fuel handling operations must be performed blind, making exact positioning and precision control of the fuel handling system components essential. EBR-II operated for 30 years, and the fuel handling system has performed approximately 25,000 fuel transfer operations in that time. Due to termination of the IFR program, EBR-II was shut down on September 30, 1994. In preparation for decommissioning, all fuel in the reactor will be transferred out of EBR-II to interim storage. This intensive fuel handling campaign will last approximately two years, and the number of transfers will be equivalent to the fuel handling done over about nine years of normal reactor operation. With this demand on the system, system reliability will be extremely important. Because of this increased demand, and considering that the system has been operating for about 32 years, system upgrades to increase reliability and efficiency are proceeding. Upgrades to the system to install new digital, solid state controls, and to take advantage of new visualization technology, are underway. Future reactor designs using liquid metal coolant will be able to incorporate imaging technology now being investigated, such as ultraviolet laser imaging and ultrasonic imaging

  5. Demand-controlling marketing of electric utilities

    Energy Technology Data Exchange (ETDEWEB)

    Raffee, H; Fritz, W

    1980-01-01

    In situations like the shortage of energy resources the particular autonomy of the users concerning energy demand raises more and more aggravating problems for the electric utilities (EU) and, last not least, for society (i.e. the peak-load problem, threatening bottlenecks in the supply situation). Thus the requirement for a demand-controlling marketing strategy of the EU with the help of which the individual demand should be influenced in the following manner is legitimate. The article discusses the targets, strategies, and instruments of marketing performed by the EU under the aspect of their efficiency concerning demand control. The discussion leads to e.g. the following results: that a marketing strategy for the sensible, responsible, and efficent use of energy, in the long-term, serves both the interests of the users and the interests of the EU; that such a marketing programme can have the required controlling effects especially with the help of strategies like market segmentation and cooperation. The discussion makes also clear that a demand-controlling marketing strategy of the EU can hardly be realized without a considerable change within the organization of the EU on one hand and, on the other, without expanding the marketing programme toward a marketing strategy of balance.

  6. Port projects put on hold as coal imports peak

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-15

    UK ports and rail operators have invested heavily to improve available capacity, but now imports are leveling off. In January to May 2007, UK coal imports totalled 19.2 mt, a drop of 6% compared to the same period in 2006. Indigenous production dropped more drastically, 23.8% to 6.62 mt. UK coal demand will be determined by such factors as the Large Combustion Plant Directive. There appears to be a second wave in the 'dash for gas' generation game as gas prices have fallen. Investment at Immingham's terminal has enabled the UK to cope with increased coal imports. ABP is now considering another coal terminal outside the locks at Hull. These plans are outlined in the article. Coal handling at Newcastle is also reported. 3 figs., 1 photos.

  7. Short- and long-run time-of-use price elasticities in Swiss residential electricity demand

    International Nuclear Information System (INIS)

    Filippini, Massimo

    2011-01-01

    This paper presents an empirical analysis on the residential demand for electricity by time-of-day. This analysis has been performed using aggregate data at the city level for 22 Swiss cities for the period 2000-2006. For this purpose, we estimated two log-log demand equations for peak and off-peak electricity consumption using static and dynamic partial adjustment approaches. These demand functions were estimated using several econometric approaches for panel data, for example LSDV and RE for static models, and LSDV and corrected LSDV estimators for dynamic models. The attempt of this empirical analysis has been to highlight some of the characteristics of the Swiss residential electricity demand. The estimated short-run own price elasticities are lower than 1, whereas in the long-run these values are higher than 1. The estimated short-run and long-run cross-price elasticities are positive. This result shows that peak and off-peak electricity are substitutes. In this context, time differentiated prices should provide an economic incentive to customers so that they can modify consumption patterns by reducing peak demand and shifting electricity consumption from peak to off-peak periods. - Highlights: → Empirical analysis on the residential demand for electricity by time-of-day. → Estimators for dynamic panel data. → Peak and off-peak residential electricity are substitutes.

  8. Liberalisation of municipal waste handling

    DEFF Research Database (Denmark)

    Busck, Ole Gunni

    2006-01-01

    for improved performance of municipal waste management. The study stresses the need for training and guidance of municipal administrators. Highlighting ‘best practice’ examples the study shows, however, that it is perfectly possible to end up with quality service on contract. It takes a mixture of careful...... of price reductions in stead of quality demands in both environmental and working environmental terms. A recent study showed major deficits in the capacities of the municipalities to administer qualitative requirements in the tender process and to manage the contracts as an integral part of a scheme...... forces and low quality performance. By assuming responsibility, setting and following up on high quality standards the tender instrument presents an additional instrument to legislation and market based means to institutionalize more sustainable practices in waste management...

  9. Refrigerated Warehouse Demand Response Strategy Guide

    Energy Technology Data Exchange (ETDEWEB)

    Scott, Doug [VaCom Technologies, San Luis Obispo, CA (United States); Castillo, Rafael [VaCom Technologies, San Luis Obispo, CA (United States); Larson, Kyle [VaCom Technologies, San Luis Obispo, CA (United States); Dobbs, Brian [VaCom Technologies, San Luis Obispo, CA (United States); Olsen, Daniel [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-11-01

    This guide summarizes demand response measures that can be implemented in refrigerated warehouses. In an appendix, it also addresses related energy efficiency opportunities. Reducing overall grid demand during peak periods and energy consumption has benefits for facility operators, grid operators, utility companies, and society. State wide demand response potential for the refrigerated warehouse sector in California is estimated to be over 22.1 Megawatts. Two categories of demand response strategies are described in this guide: load shifting and load shedding. Load shifting can be accomplished via pre-cooling, capacity limiting, and battery charger load management. Load shedding can be achieved by lighting reduction, demand defrost and defrost termination, infiltration reduction, and shutting down miscellaneous equipment. Estimation of the costs and benefits of demand response participation yields simple payback periods of 2-4 years. To improve demand response performance, it’s suggested to install air curtains and another form of infiltration barrier, such as a rollup door, for the passageways. Further modifications to increase efficiency of the refrigeration unit are also analyzed. A larger condenser can maintain the minimum saturated condensing temperature (SCT) for more hours of the day. Lowering the SCT reduces the compressor lift, which results in an overall increase in refrigeration system capacity and energy efficiency. Another way of saving energy in refrigerated warehouses is eliminating the use of under-floor resistance heaters. A more energy efficient alternative to resistance heaters is to utilize the heat that is being rejected from the condenser through a heat exchanger. These energy efficiency measures improve efficiency either by reducing the required electric energy input for the refrigeration system, by helping to curtail the refrigeration load on the system, or by reducing both the load and required energy input.

  10. Real-Time Demand Side Management Algorithm Using Stochastic Optimization

    Directory of Open Access Journals (Sweden)

    Moses Amoasi Acquah

    2018-05-01

    Full Text Available A demand side management technique is deployed along with battery energy-storage systems (BESS to lower the electricity cost by mitigating the peak load of a building. Most of the existing methods rely on manual operation of the BESS, or even an elaborate building energy-management system resorting to a deterministic method that is susceptible to unforeseen growth in demand. In this study, we propose a real-time optimal operating strategy for BESS based on density demand forecast and stochastic optimization. This method takes into consideration uncertainties in demand when accounting for an optimal BESS schedule, making it robust compared to the deterministic case. The proposed method is verified and tested against existing algorithms. Data obtained from a real site in South Korea is used for verification and testing. The results show that the proposed method is effective, even for the cases where the forecasted demand deviates from the observed demand.

  11. Hot Laboratories and Remote Handling

    International Nuclear Information System (INIS)

    2007-01-01

    The Opening talk of the workshop 'Hot Laboratories and Remote Handling' was given by Marin Ciocanescu with the communication 'Overview of R and D Program in Romanian Institute for Nuclear Research'. The works of the meeting were structured into three sections addressing the following items: Session 1. Hot cell facilities: Infrastructure, Refurbishment, Decommissioning; Session 2. Waste, transport, safety and remote handling issues; Session 3. Post-Irradiation examination techniques. In the frame of Section 1 the communication 'Overview of hot cell facilities in South Africa' by Wouter Klopper, Willie van Greunen et al, was presented. In the framework of the second session there were given the following four communications: 'The irradiated elements cell at PHENIX' by Laurent Breton et al., 'Development of remote equipment for DUPIC fuel fabrication at KAERI', by Jung Won Lee et al., 'Aspects of working with manipulators and small samples in an αβγ-box, by Robert Zubler et al., and 'The GIOCONDA experience of the Joint Research Centre Ispra: analysis of the experimental assemblies finalized to their safe recovery and dismantling', by Roberto Covini. Finally, in the framework of the third section the following five communications were presented: 'PIE of a CANDU fuel element irradiated for a load following test in the INR TRIGA reactor' by Marcel Parvan et al., 'Adaptation of the pole figure measurement to the irradiated items from zirconium alloys' by Yury Goncharenko et al., 'Fuel rod profilometry with a laser scan micrometer' by Daniel Kuster et al., 'Raman spectroscopy, a new facility at LECI laboratory to investigate neutron damage in irradiated materials' by Lionel Gosmain et al., and 'Analysis of complex nuclear materials with the PSI shielded analytical instruments' by Didier Gavillet. In addition, eleven more presentations were given as posters. Their titles were: 'Presentation of CETAMA activities (CEA analytic group)' by Alain Hanssens et al. 'Analysis of

  12. Employer Attitudes towards Peak Hour Avoidance

    NARCIS (Netherlands)

    Vonk Noordegraaf, D.M.; Annema, J.A.

    2012-01-01

    Peak Hour Avoidance is a relatively new Dutch mobility management measure. To reduce congestion frequent car drivers are given a financial reward for reducing the proportion of trips that they make during peak hours on a specific motorway section. Although previous studies show that employers are

  13. Employer attitudes towards peak hour avoidance

    NARCIS (Netherlands)

    Noordegraaf, D.M.V.; Annema, J.A.

    2012-01-01

    Peak Hour Avoidance is a relatively new Dutch mobility management measure. To reduce congestion frequent car drivers are given a financial reward for reducing the proportion of trips that they make during peak hours on a specific motorway section. Although previous studies show that employers are

  14. Peak load pricing lowers generation costs

    International Nuclear Information System (INIS)

    Lande, R.H.

    1980-01-01

    Before a utility implements peak load pricing for different classes of consumers, the costs and the benefits should be compared. The methodology described enables a utility to determine whether peak load pricing should be introduced for specific users. Cost-benefit analyses for domestic consumers and commercial/industrial consumers, showing break-even points are presented. (author)

  15. Peak Shaving Considering Streamflow Uncertainties | Iwuagwu ...

    African Journals Online (AJOL)

    The main thrust of this paper is peak shaving with a Stochastic hydro model. In peak sharing, the amount of hydro energy scheduled may be a minimum but it serves to replace less efficient thermal units. The sample system is die Kainji hydro plant and the thermal units of the National Electric Power Authority. The random ...

  16. Dramatic Demand Reduction In The Desert Southwest

    Energy Technology Data Exchange (ETDEWEB)

    Boehm, Robert [Univ. of Nevada, Las Vegas, NV (United States); Hsieh, Sean [Univ. of Nevada, Las Vegas, NV (United States); Lee, Joon [Univ. of Nevada, Las Vegas, NV (United States); Baghzouz, Yahia [Univ. of Nevada, Las Vegas, NV (United States); Cross, Andrew [Univ. of Nevada, Las Vegas, NV (United States); Chatterjee, Sarah [NV Energy, Las Vegas, NV (United States)

    2015-07-06

    This report summarizes a project that was funded to the University of Nevada Las Vegas (UNLV), with subcontractors Pulte Homes and NV Energy. The project was motivated by the fact that locations in the Desert Southwest portion of the US demonstrate very high peak electrical demands, typically in the late afternoons in the summer. These high demands often require high priced power to supply the needs, and the large loads can cause grid supply problems. An approach was proposed through this contact that would reduce the peak electrical demands to an anticipated 65% of what code-built houses of the similar size would have. It was proposed to achieve energy reduction through four approaches applied to a development of 185 homes in northwest part of Las Vegas named Villa Trieste. First, the homes would all be highly energy efficient. Secondly, each house would have a PV array installed on it. Third, an advanced demand response technique would be developed to allow the resident to have some control over the energy used. Finally, some type of battery storage would be used in the project. Pulte Homes designed the houses. The company considered initial cost vs. long-term savings and chose options that had relatively short paybacks. HERS (Home Energy Rating Service) ratings for the homes are approximately 43 on this scale. On this scale, code-built homes rate at 100, zero energy homes rate a 0, and Energy Star homes are 85. In addition a 1.764 Wp (peak Watt) rated PV array was used on each house. This was made up of solar shakes that were in visual harmony with the roofing material used. A demand response tool was developed to control the amount of electricity used during times of peak demand. While demand response techniques have been used in the utility industry for some time, this particular approach is designed to allow the customer to decide the degree of participation in the response activity. The temperature change in the residence can be decided by the residents by

  17. Fuel handling problems at KANUPP

    Energy Technology Data Exchange (ETDEWEB)

    Ahmed, I; Mazhar Hasan, S; Mugtadir, A [Karachi Nuclear Power Plant (KANUPP), Karachi (Pakistan)

    1991-04-01

    KANUPP experienced two abnormal fuel and fuel handling related problems during the year 1990. One of these had arisen due to development of end plate to end plate coupling between the two bundles at the leading end of the fuel string in channel HO2-S. The incident occurred when attempts were being made to fuel this channel. Due to pulling of sticking bundles into the acceptor fuelling machine (north) magazine, which was not designed to accommodate two bundles, a magazine rotary stop occurred. The forward motion of the charge tube was simultaneously discovered to be restricted. The incident led to stalling of fuelling machine locked on to the channel HO2, necessitating a reactor shut down. Removal of the fuelling machine was accomplished sometime later after draining of the channel. The second incident which made the fuelling of channel KO5-N temporarily inexecutable, occurred during attempts to remove its north end shield plug when this channel came up for fuelling. The incident resulted due to breaking of the lugs of the shield plug, making its withdrawal impossible. The Plant however kept operating with suspended fuelling of channel KO5, until it could no longer sustain a further increase in fuel burnup at the maximum rating position. Resolving both these problems necessitated draining of the respective channels, leaving the resident fuel uncovered for the duration of the associated operation. Due to substantial difference in the oxidation temperatures Of UO{sub 2} and Zircaloy and its influence as such on the cooling requirement, it was necessary either to determine explicitly that the respective channels did not contain defective fuel bundles or wait for time long enough to allow the decay heat to reduce to manageable proportions. This had a significant bearing on the Plant down time necessary for the rectification of the problems. This paper describes the two incidents in detail and dwells upon the measures adopted to resolve the related problems. (author)

  18. Fuel handling problems at KANUPP

    International Nuclear Information System (INIS)

    Ahmed, I.; Mazhar Hasan, S.; Mugtadir, A.

    1991-01-01

    KANUPP experienced two abnormal fuel and fuel handling related problems during the year 1990. One of these had arisen due to development of end plate to end plate coupling between the two bundles at the leading end of the fuel string in channel HO2-S. The incident occurred when attempts were being made to fuel this channel. Due to pulling of sticking bundles into the acceptor fuelling machine (north) magazine, which was not designed to accommodate two bundles, a magazine rotary stop occurred. The forward motion of the charge tube was simultaneously discovered to be restricted. The incident led to stalling of fuelling machine locked on to the channel HO2, necessitating a reactor shut down. Removal of the fuelling machine was accomplished sometime later after draining of the channel. The second incident which made the fuelling of channel KO5-N temporarily inexecutable, occurred during attempts to remove its north end shield plug when this channel came up for fuelling. The incident resulted due to breaking of the lugs of the shield plug, making its withdrawal impossible. The Plant however kept operating with suspended fuelling of channel KO5, until it could no longer sustain a further increase in fuel burnup at the maximum rating position. Resolving both these problems necessitated draining of the respective channels, leaving the resident fuel uncovered for the duration of the associated operation. Due to substantial difference in the oxidation temperatures Of UO 2 and Zircaloy and its influence as such on the cooling requirement, it was necessary either to determine explicitly that the respective channels did not contain defective fuel bundles or wait for time long enough to allow the decay heat to reduce to manageable proportions. This had a significant bearing on the Plant down time necessary for the rectification of the problems. This paper describes the two incidents in detail and dwells upon the measures adopted to resolve the related problems. (author)

  19. Acquisition of ICU data: concepts and demands.

    Science.gov (United States)

    Imhoff, M

    1992-12-01

    As the issue of data overload is a problem in critical care today, it is of utmost importance to improve acquisition, storage, integration, and presentation of medical data, which appears only feasible with the help of bedside computers. The data originates from four major sources: (1) the bedside medical devices, (2) the local area network (LAN) of the ICU, (3) the hospital information system (HIS) and (4) manual input. All sources differ markedly in quality and quantity of data and in the demands of the interfaces between source of data and patient database. The demands for data acquisition from bedside medical devices, ICU-LAN and HIS concentrate on technical problems, such as computational power, storage capacity, real-time processing, interfacing with different devices and networks and the unmistakable assignment of data to the individual patient. The main problem of manual data acquisition is the definition and configuration of the user interface that must allow the inexperienced user to interact with the computer intuitively. Emphasis must be put on the construction of a pleasant, logical and easy-to-handle graphical user interface (GUI). Short response times will require high graphical processing capacity. Moreover, high computational resources are necessary in the future for additional interfacing devices such as speech recognition and 3D-GUI. Therefore, in an ICU environment the demands for computational power are enormous. These problems are complicated by the urgent need for friendly and easy-to-handle user interfaces. Both facts place ICU bedside computing at the vanguard of present and future workstation development leaving no room for solutions based on traditional concepts of personal computers.(ABSTRACT TRUNCATED AT 250 WORDS)

  20. Aggregated Demand Modelling Including Distributed Generation, Storage and Demand Response

    OpenAIRE

    Marzooghi, Hesamoddin; Hill, David J.; Verbic, Gregor

    2014-01-01

    It is anticipated that penetration of renewable energy sources (RESs) in power systems will increase further in the next decades mainly due to environmental issues. In the long term of several decades, which we refer to in terms of the future grid (FG), balancing between supply and demand will become dependent on demand actions including demand response (DR) and energy storage. So far, FG feasibility studies have not considered these new demand-side developments for modelling future demand. I...

  1. The peak in neutron powder diffraction

    International Nuclear Information System (INIS)

    Laar, B. van; Yelon, W.B.

    1984-01-01

    For the application of Rietveld profile analysis to neutron powder diffraction data a precise knowledge of the peak profile, in both shape and position, is required. The method now in use employs a Gaussian shaped profile with a semi-empirical asymmetry correction for low-angle peaks. The integrated intensity is taken to be proportional to the classical Lorentz factor calculated for the X-ray case. In this paper an exact expression is given for the peak profile based upon the geometrical dimensions of the diffractometer. It is shown that the asymmetry of observed peaks is well reproduced by this expression. The angular displacement of the experimental profile with respect to the nominal Bragg angle value is larger than expected. Values for the correction to the classical Lorentz factor for the integrated intensity are given. The exact peak profile expression has been incorporated into a Rietveld profile analysis refinement program. (Auth.)

  2. Gas inventory charges and peak-load reliability

    International Nuclear Information System (INIS)

    Lyon, T.P.; Hackett, S.C.

    1990-01-01

    The natural gas industry has historically been organized through a vertical sequence of long-term contracts, the first between wellhead producer and pipeline, and the second between pipeline and local distribution company (LDC). These long-term contracts contained provisions, variously called take-or-pay (TOP) clauses or minimum bills, that required buyers to pay for a minimum level of supply in all later time periods, regardless of the buyers' actual demand requirements. As a result, the pipeline's purchase obligation was typically offset by the distributor's purchase obligation, so that the pipeline essentially passed the minimum purchase requirement directly from producer to distributor. The authors focus on the role GICs (Gas Inventory Charges) can play in the provision of peak-load reliability, and the effects of GICs and their treatment by regulators on pipeline system design. In particular, they compare the various options available to local distribution companies (LDCs) for providing peak-load reliability, emphasizing the alternative downstream storage. They find that the ratemaking decisions of state regulators may distort LDC choices between different gas supply options, inducing what may be an inefficient demand for new storage facilities. GICs, when competitively prices, offer state regulators a means of circumventing these distortions

  3. A New Approach for Handling of Micro Parts in Bulk Metal Forming

    DEFF Research Database (Denmark)

    Mahshid, Rasoul; Hansen, Hans Nørgaard; Arentoft, M.

    2012-01-01

    of production [1]. This can fulfill the demands for mass production and miniaturization in industries and academic communities. According to the recent studies, topics related to materials, process and simulation have been investigated intensively and well documented. Machines, forming tools and handling...... systems are critical elements to complete micro forming technology for transferring knowledge to industries and toward miniature manufacturing systems (micro factory) [2]. Since most metal forming processes are multi stage, making a new handling system with high reliability on accuracy and speed...... have been optimized or handling systems based on new concepts for gripping and releasing micro parts have been proposed. Making a handling system for micro parts made by sheet metals or foils is easier than those in bulk metal forming because parts are attached to the sheet during the forming process...

  4. Automatic liquid handling for life science: a critical review of the current state of the art.

    Science.gov (United States)

    Kong, Fanwei; Yuan, Liang; Zheng, Yuan F; Chen, Weidong

    2012-06-01

    Liquid handling plays a pivotal role in life science laboratories. In experiments such as gene sequencing, protein crystallization, antibody testing, and drug screening, liquid biosamples frequently must be transferred between containers of varying sizes and/or dispensed onto substrates of varying types. The sample volumes are usually small, at the micro- or nanoliter level, and the number of transferred samples can be huge when investigating large-scope combinatorial conditions. Under these conditions, liquid handling by hand is tedious, time-consuming, and impractical. Consequently, there is a strong demand for automated liquid-handling methods such as sensor-integrated robotic systems. In this article, we survey the current state of the art in automatic liquid handling, including technologies developed by both industry and research institutions. We focus on methods for dealing with small volumes at high throughput and point out challenges for future advancements.

  5. Peak tree: a new tool for multiscale hierarchical representation and peak detection of mass spectrometry data.

    Science.gov (United States)

    Zhang, Peng; Li, Houqiang; Wang, Honghui; Wong, Stephen T C; Zhou, Xiaobo

    2011-01-01

    Peak detection is one of the most important steps in mass spectrometry (MS) analysis. However, the detection result is greatly affected by severe spectrum variations. Unfortunately, most current peak detection methods are neither flexible enough to revise false detection results nor robust enough to resist spectrum variations. To improve flexibility, we introduce peak tree to represent the peak information in MS spectra. Each tree node is a peak judgment on a range of scales, and each tree decomposition, as a set of nodes, is a candidate peak detection result. To improve robustness, we combine peak detection and common peak alignment into a closed-loop framework, which finds the optimal decomposition via both peak intensity and common peak information. The common peak information is derived and loopily refined from the density clustering of the latest peak detection result. Finally, we present an improved ant colony optimization biomarker selection method to build a whole MS analysis system. Experiment shows that our peak detection method can better resist spectrum variations and provide higher sensitivity and lower false detection rates than conventional methods. The benefits from our peak-tree-based system for MS disease analysis are also proved on real SELDI data.

  6. Household electricity demand profiles

    DEFF Research Database (Denmark)

    Marszal, Anna Joanna; Heiselberg, Per Kvols; Larsen, Olena Kalyanova

    2016-01-01

    Highlights •A 1-min resolution household electricity load model is presented. •Model adapts a bottom-up approach with single appliance as the main building block. •Load profiles are used to analyse the flexibility potential of household appliances. •Load profiles can be applied in other domains, .......g. building energy simulations. •The demand level of houses with different number of occupants is well captured....

  7. Energy demand patterns

    Energy Technology Data Exchange (ETDEWEB)

    Hoffmann, L; Schipper, L; Meyers, S; Sathaye, J; Hara, Y

    1984-05-01

    This report brings together three papers on energy demand presented at the Energy Research Priorities Seminar held in Ottawa on 8-10 August 1983. The first paper suggests a framework in which energy demand studies may be organized if they are to be useful in policy-making. Disaggregation and the analysis of the chain of energy transformations are possible paths toward more stable and reliable parameters. The second paper points to another factor that leads to instability in sectoral parameters, namely a changeover from one technology to another; insofar as technologies producing a product (or service) vary in their energy intensity, a technological shift will also change the energy intensity of the product. Rapid technological change is characteristic of some sectors in developing countries, and may well account for the high aggregate GDP-elasticities of energy consumption observed. The third paper begins with estimates of these elasticities, which were greater than one for all the member countries of the Asian Development Bank in 1961-78. The high elasticities, together with extreme oil dependence, made them vulnerable to the drastic rise in the oil price after 1973. The author distinguishes three diverging patterns of national experience. The oil-surplus countries naturally gained from the rise in the oil price. Among oil-deficit countries, the newly industrialized countries expanded their exports so rapidly that the oil crisis no longer worried them. For the rest, balance of payments adjustments became a prime concern of policy. Whether they dealt with the oil bill by borrowing, by import substitution, or by demand restraint, the impact of energy on their growth was unmistakable. The paper also shows why energy-demand studies, and energy studies in general, deserve to be taken seriously. 16 refs., 4 figs., 18 tabs.

  8. Migration and Tourism Demand

    Directory of Open Access Journals (Sweden)

    Nuno Carlos LEITÃO

    2012-02-01

    Full Text Available This study considers the relationship between immigration and Portuguese tourism demand for the period 1995-2008, using a dynamic panel data approach. The findings indicate that Portuguese tourism increased significantly during the period in accordance with the values expected for a developed country. The regression results show that income, shock of immigration, population, and geographical distance between Portugal and countries of origin are the main determinants of Portuguese tourism.

  9. Demand scenarios, worldwide

    Energy Technology Data Exchange (ETDEWEB)

    Schaefer, A [Massachusetts Inst. of Technology, Center for Technology, Policy and Industrial Development and the MIT Joint Program on the Science and Policy of Global Change, Cambridge, MA (United States)

    1996-11-01

    Existing methods are inadequate for developing aggregate (regional and global) and long-term (several decades) passenger transport demand scenarios, since they are mainly based on simple extensions of current patterns rather than causal relationships that account for the competition among transport modes (aircraft, automobiles, buses and trains) to provide transport services. The demand scenario presented in this paper is based on two empirically proven invariances of human behavior. First, transport accounts for 10 to 15 percent of household total expenditures for those owning an automobile, and around 5 percent for non-motorized households on average (travel money budget). Second, the mean time spent traveling is approximately one hour per capita per day (travel time budget). These two budgets constraints determine the dynamics of the scenario: rising income increases per capita expenditure on travel which, in turn, increase demand for mobility. Limited travel time constraints travelers to shift to faster transport systems. The scenario is initiated with the first integrated historical data set on traffic volume in 11 world regions and the globe from 1960 to 1990 for all major modes of motorized transport. World average per capita traffic volume, which was 1,800 kilometers in 1960 and 4,2090 in 1990, is estimated to rise to 7,900 kilometers in 2020 - given a modest average increase in Gross World Product of 1.9% per year. Higher economic growth rates in Asian regions result in an increase in regional per capita traffic volume up to a factor of 5.3 from 1990 levels. Modal splits continue shifting to more flexible and faster modes of transport. At one point, passenger cars can no longer satisfy the increasing demand for speed (i.e. rising mobility within a fixed time budget). In North America it is estimated that the absolute traffic volume of automobiles will gradually decline starting in the 2010s. (author) 13 figs., 6 tabs., 35 refs.

  10. Multiscale peak detection in wavelet space.

    Science.gov (United States)

    Zhang, Zhi-Min; Tong, Xia; Peng, Ying; Ma, Pan; Zhang, Ming-Jin; Lu, Hong-Mei; Chen, Xiao-Qing; Liang, Yi-Zeng

    2015-12-07

    Accurate peak detection is essential for analyzing high-throughput datasets generated by analytical instruments. Derivatives with noise reduction and matched filtration are frequently used, but they are sensitive to baseline variations, random noise and deviations in the peak shape. A continuous wavelet transform (CWT)-based method is more practical and popular in this situation, which can increase the accuracy and reliability by identifying peaks across scales in wavelet space and implicitly removing noise as well as the baseline. However, its computational load is relatively high and the estimated features of peaks may not be accurate in the case of peaks that are overlapping, dense or weak. In this study, we present multi-scale peak detection (MSPD) by taking full advantage of additional information in wavelet space including ridges, valleys, and zero-crossings. It can achieve a high accuracy by thresholding each detected peak with the maximum of its ridge. It has been comprehensively evaluated with MALDI-TOF spectra in proteomics, the CAMDA 2006 SELDI dataset as well as the Romanian database of Raman spectra, which is particularly suitable for detecting peaks in high-throughput analytical signals. Receiver operating characteristic (ROC) curves show that MSPD can detect more true peaks while keeping the false discovery rate lower than MassSpecWavelet and MALDIquant methods. Superior results in Raman spectra suggest that MSPD seems to be a more universal method for peak detection. MSPD has been designed and implemented efficiently in Python and Cython. It is available as an open source package at .

  11. 9 CFR 3.118 - Handling.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Handling. 3.118 Section 3.118 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment, and Transportation of Marine...

  12. How to Handle Impasses in Bargaining.

    Science.gov (United States)

    Durrant, Robert E.

    Guidelines in an outline format are presented to school board members and administrators on how to handle impasses in bargaining. The following two rules are given: there sometimes may be strikes, but there always will be settlements; and on the way to settlements, there always will be impasses. Suggestions for handling impasses are listed under…

  13. Handling uncertainty through adaptiveness in planning approaches

    NARCIS (Netherlands)

    Zandvoort, M.; Vlist, van der M.J.; Brink, van den A.

    2018-01-01

    Planners and water managers seek to be adaptive to handle uncertainty through the use of planning approaches. In this paper, we study what type of adaptiveness is proposed and how this may be operationalized in planning approaches to adequately handle different uncertainties. We took a

  14. Survey of postharvest handling, preservation and processing ...

    African Journals Online (AJOL)

    Survey of postharvest handling, preservation and processing practices along the camel milk chain in Isiolo district, Kenya. ... Despite the important contribution of camel milk to food security for pastoralists in Kenya, little is known about the postharvest handling, preservation and processing practices. In this study, existing ...

  15. PND fuel handling decontamination: facilities and techniques

    International Nuclear Information System (INIS)

    Pan, R.Y.

    1996-01-01

    The use of various decontamination techniques and equipment has become a critical part of Fuel Handling maintenance work at Ontario Hydro's Pickering Nuclear Division. This paper presents an overview of the set up and techniques used for decontamination in the PND Fuel Handling Maintenance Facility and the effectiveness of each. (author). 1 tab., 9 figs

  16. Handling Kids in Crisis with Care

    Science.gov (United States)

    Bushinski, Cari

    2018-01-01

    The Handle with Care program helps schools help students who experience trauma. While at the scene of an event like a domestic violence call, drug raid, or car accident, law enforcement personnel determine the names and school of any children present. They notify that child's school to "handle ___ with care" the next day, and the school…

  17. PND fuel handling decontamination: facilities and techniques

    Energy Technology Data Exchange (ETDEWEB)

    Pan, R Y [Ontario Hydro, Toronto, ON (Canada)

    1997-12-31

    The use of various decontamination techniques and equipment has become a critical part of Fuel Handling maintenance work at Ontario Hydro`s Pickering Nuclear Division. This paper presents an overview of the set up and techniques used for decontamination in the PND Fuel Handling Maintenance Facility and the effectiveness of each. (author). 1 tab., 9 figs.

  18. Handling knowledge on osteoporosis - a qualitative study

    DEFF Research Database (Denmark)

    Nielsen, Dorthe; Huniche, Lotte; Brixen, Kim

    2013-01-01

    Scand J Caring Sci; 2012 Handling knowledge on osteoporosis - a qualitative study The aim of this qualitative study was to increase understanding of the importance of osteoporosis information and knowledge for patients' ways of handling osteoporosis in their everyday lives. Interviews were...

  19. Supply and demand perspectives

    International Nuclear Information System (INIS)

    Trienekens, Pieter

    1999-01-01

    The outlook for the European gas market is one of steady growth. This growth will manifest itself in all regions and in all sectors of the market, but most strongly in the power generating sector. To meet future demand, it is necessary to bring gas to Western Europe from remote sources in Russia, North Africa and Norway. These new gas supplies require heavy investments in production and transportation, which can only be undertaken on the basis of long-term take-or-pay contracts. Famous examples of such contracts are the development of the Troll field, the Yamal-Europe pipeline connection, and the bringing on stream of Nigerian LNG for Europe. Tensions are likely to arise between the nature of these long-term gas contracts and the dynamic nature of demand in the gas market, and more specifically in the main growth market, the power sector. The presentation further elaborates on the tensions underlying supply and demand in the years to come

  20. Two-Stage Electricity Demand Modeling Using Machine Learning Algorithms

    Directory of Open Access Journals (Sweden)

    Krzysztof Gajowniczek

    2017-10-01

    Full Text Available Forecasting of electricity demand has become one of the most important areas of research in the electric power industry, as it is a critical component of cost-efficient power system management and planning. In this context, accurate and robust load forecasting is supposed to play a key role in reducing generation costs, and deals with the reliability of the power system. However, due to demand peaks in the power system, forecasts are inaccurate and prone to high numbers of errors. In this paper, our contributions comprise a proposed data-mining scheme for demand modeling through peak detection, as well as the use of this information to feed the forecasting system. For this purpose, we have taken a different approach from that of time series forecasting, representing it as a two-stage pattern recognition problem. We have developed a peak classification model followed by a forecasting model to estimate an aggregated demand volume. We have utilized a set of machine learning algorithms to benefit from both accurate detection of the peaks and precise forecasts, as applied to the Polish power system. The key finding is that the algorithms can detect 96.3% of electricity peaks (load value equal to or above the 99th percentile of the load distribution and deliver accurate forecasts, with mean absolute percentage error (MAPE of 3.10% and resistant mean absolute percentage error (r-MAPE of 2.70% for the 24 h forecasting horizon.

  1. DDOS ATTACK DETECTION SIMULATION AND HANDLING MECHANISM

    Directory of Open Access Journals (Sweden)

    Ahmad Sanmorino

    2013-11-01

    Full Text Available In this study we discuss how to handle DDoS attack that coming from the attacker by using detection method and handling mechanism. Detection perform by comparing number of packets and number of flow. Whereas handling mechanism perform by limiting or drop the packets that detected as a DDoS attack. The study begins with simulation on real network, which aims to get the real traffic data. Then, dump traffic data obtained from the simulation used for detection method on our prototype system called DASHM (DDoS Attack Simulation and Handling Mechanism. From the result of experiment that has been conducted, the proposed method successfully detect DDoS attack and handle the incoming packet sent by attacker.

  2. MRI of meniscal bucket-handle tears

    Energy Technology Data Exchange (ETDEWEB)

    Magee, T.H.; Hinson, G.W. [Menorah Medical Center, Overland Park, KS (United States). Dept. of Radiology

    1998-09-01

    A meniscal bucket-handle tear is a tear with an attached fragment displaced from the meniscus of the knee joint. Low sensitivity of MRI for detection of bucket-handle tears (64% as compared with arthroscopy) has been reported previously. We report increased sensitivity for detecting bucket-handle tears with the use of coronal short tau inversion recovery (STIR) images. Results. By using four criteria for diagnosis of meniscal bucket-handle tears, our overall sensitivity compared with arthroscopy was 93% (28 of 30 meniscal bucket-handle tears seen at arthroscopy were detected by MRI). The meniscal fragment was well visualized in all 28 cases on coronal STIR images. The double posterior cruciate ligament sign was seen in 8 of 30 cases, the flipped meniscus was seen in 10 of 30 cases and a fragment in the intercondylar notch was seen in 18 of 30 cases. (orig.)

  3. Open Automated Demand Response for Small Commerical Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Dudley, June Han; Piette, Mary Ann; Koch, Ed; Hennage, Dan

    2009-05-01

    This report characterizes small commercial buildings by market segments, systems and end-uses; develops a framework for identifying demand response (DR) enabling technologies and communication means; and reports on the design and development of a low-cost OpenADR enabling technology that delivers demand reductions as a percentage of the total predicted building peak electric demand. The results show that small offices, restaurants and retail buildings are the major contributors making up over one third of the small commercial peak demand. The majority of the small commercial buildings in California are located in southern inland areas and the central valley. Single-zone packaged units with manual and programmable thermostat controls make up the majority of heating ventilation and air conditioning (HVAC) systems for small commercial buildings with less than 200 kW peak electric demand. Fluorescent tubes with magnetic ballast and manual controls dominate this customer group's lighting systems. There are various ways, each with its pros and cons for a particular application, to communicate with these systems and three methods to enable automated DR in small commercial buildings using the Open Automated Demand Response (or OpenADR) communications infrastructure. Development of DR strategies must consider building characteristics, such as weather sensitivity and load variability, as well as system design (i.e. under-sizing, under-lighting, over-sizing, etc). Finally, field tests show that requesting demand reductions as a percentage of the total building predicted peak electric demand is feasible using the OpenADR infrastructure.

  4. Handling Procedures of Vegetable Crops

    Science.gov (United States)

    Perchonok, Michele; French, Stephen J.

    2004-01-01

    The National Aeronautics and Space Administration (NASA) is working towards future long duration manned space flights beyond low earth orbit. The duration of these missions may be as long as 2.5 years and will likely include a stay on a lunar or planetary surface. The primary goal of the Advanced Food System in these long duration exploratory missions is to provide the crew with a palatable, nutritious, and safe food system while minimizing volume, mass, and waste. Vegetable crops can provide the crew with added nutrition and variety. These crops do not require any cooking or food processing prior to consumption. The vegetable crops, unlike prepackaged foods, will provide bright colors, textures (crispy), and fresh aromas. Ten vegetable crops have been identified for possible use in long duration missions. They are lettuce, spinach, carrot, tomato, green onion, radish, bell pepper, strawberries, fresh herbs, and cabbage. Whether these crops are grown on a transit vehicle (e.g., International Space Station) or on the lunar or planetary surface, it will be necessary to determine how to safely handle the vegetables while maintaining acceptability. Since hydrogen peroxide degrades into water and oxygen and is generally recognized as safe (GRAS), hydrogen peroxide has been recommended as the sanitizer. The objective of th is research is to determine the required effective concentration of hydrogen peroxide. In addition, it will be determined whether the use of hydrogen peroxide, although a viable sanitizer, adversely affects the quality of the vegetables. Vegetables will be dipped in 1 % hydrogen peroxide, 3% hydrogen peroxide, or 5% hydrogen peroxide. Treated produce and controls will be stored in plastic bags at 5 C for up to 14 days. Sensory, color, texture, and total plate count will be measured. The effect on several vegetables including lettuce, radish, tomato and strawberries has been completed. Although each vegetable reacts to hydrogen peroxide differently, the

  5. The handling of radiation accidents

    International Nuclear Information System (INIS)

    1977-01-01

    The symposium was attended by 204 participants from 39 countries and 5 international organizations. Forty-two papers were presented in 8 sessions. The purpose of the meeting was to foster an exchange of experiences gained in establishing and exercising plans for mitigating the effects of radiation accidents and in the handling of actual accident situations. Only a small number of accidents were reported at the symposium, and this reflects the very high standards of safety that has been achieved by the nuclear industry. No accidents of radiological significance were reported to have occurred at commercial nuclear power plants. Of the accidents reported, industrial radiography continues to be the area in which most of the radiation accidents occur. The experience gained in the reported accident situations served to confirm the crucial importance of the prompt availability of medical and radiological services, particularly in the case of uptake of radioactive material, and emphasized the importance of detailed investigation into the causes of the accident in order to improve preventative measures. One of the principal themes of the symposium involved emergency procedures related to nuclear power plant accidents, and several papers defining the scope, progression and consequences of design base accidents for both thermal and fast reactor systems were presented. These were complemented by papers defining the resultant protection requirements that should be satisfied in the establishment of plans designed to mitigate the effects of the postulated accident situations. Several papers were presented describing existing emergency organizational arrangements relating both to specific nuclear power plants and to comprehensive national schemes, and a particularly informative session was devoted to the topic of training of personnel in the practical conduct of emergency arrangements. The general feeling of the participants was one of studied confidence in the competence and

  6. The effect of utility time-varying pricing and load control strategies on residential summer peak electricity use. A review

    International Nuclear Information System (INIS)

    Newsham, Guy R.; Bowker, Brent G.

    2010-01-01

    Peak demand for electricity in North America is expected to grow, challenging electrical utilities to supply this demand in a cost-effective, reliable manner. Therefore, there is growing interest in strategies to reduce peak demand by eliminating electricity use, or shifting it to non-peak times. This strategy is commonly called 'demand response'. In households, common strategies are time-varying pricing, which charge more for energy use on peak, or direct load control, which allows utilities to curtail certain loads during high demand periods. We reviewed recent North American studies of these strategies. The data suggest that the most effective strategy is a critical peak price (CPP) program with enabling technology to automatically curtail loads on event days. There is little evidence that this causes substantial hardship for occupants, particularly if they have input into which loads are controlled and how, and have an override option. In such cases, a peak load reduction of at least 30% is a reasonable expectation. It might be possible to attain such load reductions without enabling technology by focusing on household types more likely to respond, and providing them with excellent support. A simple time-of-use (TOU) program can only expect to realise on-peak reductions of 5%. (author)

  7. Isotope resolution of the iron peak

    International Nuclear Information System (INIS)

    Henke, R.P.; Benton, E.V.

    1977-01-01

    A stack of Lexan detectors from the Apollo 17 mission has been analyzed to obtain Z measurements of sufficient accuracy to resolve the iron peak into its isotopic components. Within this distribution several peaks are present. With the centrally located, most populated peak assumed to be 56 Fe, the measurements imply that the abundances of 54 Fe and 58 Fe are appreciable fractions of the 56 Fe abundance. This result is in agreement with those of Webber et al. and Siegman et al. but in disagreement with the predictions of Tsao et al. (Auth.)

  8. Mechanical demands of kettlebell swing exercise.

    Science.gov (United States)

    Lake, Jason P; Lauder, Mike A

    2012-12-01

    The aims of this study were to establish mechanical demands of kettlebell swing exercise and provide context by comparing them to mechanical demands of back squat and jump squat exercise. Sixteen men performed 2 sets of 10 swings with 16, 24, and 32 kg, 2 back squats with 20, 40, 60, and 80% 1-repetition maximum (1RM), and 2 jump squats with 0, 20, 40, and 60% 1RM. Sagittal plane motion and ground reaction forces (GRFs) were recorded during swing performance, and GRFs were recorded during back and jump squat performances. Net impulse, and peak and mean propulsion phase force and power applied to the center of mass (CM) were obtained from GRF data and kettlebell displacement and velocity from motion data. The results of repeated measures analysis of variance showed that all swing CM measures were maximized during the 32-kg condition but that velocity of the kettlebell was maximized during the 16-kg condition; displacement was consistent across different loads. Peak and mean force tended to be greater during back and jump squat performances, but swing peak and mean power were greater than back squat power and largely comparable with jump squat power. However, the highest net impulse was recorded during swing exercise with 32 kg (276.1 ± 45.3 N·s vs. 60% 1RM back squat: 182.8 ± 43.1 N·s, and 40% jump squat: 231.3 ± 47.1 N·s). These findings indicate a large mechanical demand during swing exercise that could make swing exercise a useful addition to strength and conditioning programs that aim to develop the ability to rapidly apply force.

  9. Automated Peak Picking and Peak Integration in Macromolecular NMR Spectra Using AUTOPSY

    Science.gov (United States)

    Koradi, Reto; Billeter, Martin; Engeli, Max; Güntert, Peter; Wüthrich, Kurt

    1998-12-01

    A new approach for automated peak picking of multidimensional protein NMR spectra with strong overlap is introduced, which makes use of the program AUTOPSY (automatedpeak picking for NMRspectroscopy). The main elements of this program are a novel function for local noise level calculation, the use of symmetry considerations, and the use of lineshapes extracted from well-separated peaks for resolving groups of strongly overlapping peaks. The algorithm generates peak lists with precise chemical shift and integral intensities, and a reliability measure for the recognition of each peak. The results of automated peak picking of NOESY spectra with AUTOPSY were tested in combination with the combined automated NOESY cross peak assignment and structure calculation routine NOAH implemented in the program DYANA. The quality of the resulting structures was found to be comparable with those from corresponding data obtained with manual peak picking.

  10. Meeting increased demand.

    Science.gov (United States)

    Blair, Andrew

    2004-07-01

    New Zealand is a little country with a little economy but with a population that's rapidly aging. New Zealand's population is only 4.3 million people. It's GDP is only $US58.6 billion (2002). New Zealand's expenditure on health as a percentage of GDP is not out of line with that of other countries. As a nation we have been increasing expenditure on health over recent years. In 1990 we spent 7% of GDP on health. In 1995 that increased to 7.65% and is now 8.3%. However, in per capita terms our expenditure on health does not compare so well with like countries. The size of New Zealand's economy is restricting what our country spends on health. Health is already the second highest demand on the New Zealand tax dollar. The tolerance of New Zealanders would be challenged if a Government attempted to increase taxes further to meet the growing demands for expenditure on health, but at the same time the population's expectations are increasing. This is the challenging situation we face today. What lies ahead? Like all industrialized countries New Zealand is facing an aging population. The population below age 40 is decreasing, but it is increasing significantly over that age. 16% of the population is currently aged over 60. By 2051 this proportion will almost double to just over 31%. Coupled with the aging population is increased awareness and expectations, as access to options for treatment and technology becomes readily accessible to the population through such media as the internet. The extent of the impact of the aging population can be clearly represented by focusing on one specialty such as orthopaedics. The New Zealand Orthopaecic Association undertook a study in July 2003 which concluded (among other things) that as a result of the projected aging of the population, over the next 50 years: Musculo-skeletal operations will increase by over 30%. The number of hip replacements will nearly double. The incidence of osteoporosis will increase by a massive 201%. The number

  11. Can Evolution Supply What Ecology Demands?

    Science.gov (United States)

    Kokko, Hanna; Chaturvedi, Anurag; Croll, Daniel; Fischer, Martin C; Guillaume, Frédéric; Karrenberg, Sophie; Kerr, Ben; Rolshausen, Gregor; Stapley, Jessica

    2017-03-01

    A simplistic view of the adaptive process pictures a hillside along which a population can climb: when ecological 'demands' change, evolution 'supplies' the variation needed for the population to climb to a new peak. Evolutionary ecologists point out that this simplistic view can be incomplete because the fitness landscape changes dynamically as the population evolves. Geneticists meanwhile have identified complexities relating to the nature of genetic variation and its architecture, and the importance of epigenetic variation is under debate. In this review, we highlight how complexity in both ecological 'demands' and the evolutionary 'supply' influences organisms' ability to climb fitness landscapes that themselves change dynamically as evolution proceeds, and encourage new synthetic effort across research disciplines towards ecologically realistic studies of adaptation. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Fuel handling machine and auxiliary systems for a fuel handling cell

    International Nuclear Information System (INIS)

    Suikki, M.

    2013-10-01

    This working report is an update for as well as a supplement to an earlier fuel handling machine design (Kukkola and Roennqvist 2006). A focus in the earlier design proposal was primarily on the selection of a mechanical structure and operating principle for the fuel handling machine. This report introduces not only a fuel handling machine design but also auxiliary fuel handling cell equipment and its operation. An objective of the design work was to verify the operating principles of and space allocations for fuel handling cell equipment. The fuel handling machine is a remote controlled apparatus capable of handling intensely radiating fuel assemblies in the fuel handling cell of an encapsulation plant. The fuel handling cell is air tight space radiation-shielded with massive concrete walls. The fuel handling machine is based on a bridge crane capable of traveling in the handling cell along wall tracks. The bridge crane has its carriage provided with a carousel type turntable having mounted thereon both fixed and telescopic masts. The fixed mast has a gripper movable on linear guides for the transfer of fuel assemblies. The telescopic mast has a manipulator arm capable of maneuvering equipment present in the fuel handling cell, as well as conducting necessary maintenance and cleaning operations or rectifying possible fault conditions. The auxiliary fuel handling cell systems consist of several subsystems. The subsystems include a service manipulator, a tool carrier for manipulators, a material hatch, assisting winches, a vacuum cleaner, as well as a hose reel. With the exception of the vacuum cleaner, the devices included in the fuel handling cell's auxiliary system are only used when the actual encapsulation process is not ongoing. The malfunctions of mechanisms or actuators responsible for the motion actions of a fuel handling machine preclude in a worst case scenario the bringing of the fuel handling cell and related systems to a condition appropriate for

  13. Fuel handling machine and auxiliary systems for a fuel handling cell

    Energy Technology Data Exchange (ETDEWEB)

    Suikki, M. [Optimik Oy, Turku (Finland)

    2013-10-15

    This working report is an update for as well as a supplement to an earlier fuel handling machine design (Kukkola and Roennqvist 2006). A focus in the earlier design proposal was primarily on the selection of a mechanical structure and operating principle for the fuel handling machine. This report introduces not only a fuel handling machine design but also auxiliary fuel handling cell equipment and its operation. An objective of the design work was to verify the operating principles of and space allocations for fuel handling cell equipment. The fuel handling machine is a remote controlled apparatus capable of handling intensely radiating fuel assemblies in the fuel handling cell of an encapsulation plant. The fuel handling cell is air tight space radiation-shielded with massive concrete walls. The fuel handling machine is based on a bridge crane capable of traveling in the handling cell along wall tracks. The bridge crane has its carriage provided with a carousel type turntable having mounted thereon both fixed and telescopic masts. The fixed mast has a gripper movable on linear guides for the transfer of fuel assemblies. The telescopic mast has a manipulator arm capable of maneuvering equipment present in the fuel handling cell, as well as conducting necessary maintenance and cleaning operations or rectifying possible fault conditions. The auxiliary fuel handling cell systems consist of several subsystems. The subsystems include a service manipulator, a tool carrier for manipulators, a material hatch, assisting winches, a vacuum cleaner, as well as a hose reel. With the exception of the vacuum cleaner, the devices included in the fuel handling cell's auxiliary system are only used when the actual encapsulation process is not ongoing. The malfunctions of mechanisms or actuators responsible for the motion actions of a fuel handling machine preclude in a worst case scenario the bringing of the fuel handling cell and related systems to a condition appropriate for

  14. Opportunities for Automated Demand Response in California Agricultural Irrigation

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, Daniel [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Aghajanzadeh, Arian [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); McKane, Aimee [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-08-01

    Pumping water for agricultural irrigation represents a significant share of California’s annual electricity use and peak demand. It also represents a large source of potential flexibility, as farms possess a form of storage in their wetted soil. By carefully modifying their irrigation schedules, growers can participate in demand response without adverse effects on their crops. This report describes the potential for participation in demand response and automated demand response by agricultural irrigators in California, as well as barriers to widespread participation. The report first describes the magnitude, timing, location, purpose, and manner of energy use in California. Typical on-­farm controls are discussed, as well as common impediments to participation in demand response and automated demand response programs. Case studies of demand response programs in California and across the country are reviewed, and their results along with overall California demand estimates are used to estimate statewide demand response potential. Finally, recommendations are made for future research that can enhance the understanding of demand response potential in this industry.

  15. Ethane supply and demand

    International Nuclear Information System (INIS)

    Jamerson, J.B.

    1993-01-01

    Estimates are given for ethane production, chiefly from the Gulf Coast area. Increase in interregional transfers are predicted. Comparisons from 1992 through 1995 are made. The author concludes the following: ethane will be supply limited over the decade of the 90's; values will be over competing feedstocks; minimum practical demands will be close to available supply; regional relationships will reflect pipeline tariffs; purity ethane/EP spreads may narrow with new Mt. Belvieu fractionation capacity; new domestic supplies will back out imports; and Ethane's share of ethylene production may drop over the period

  16. Bayesian Peak Picking for NMR Spectra

    KAUST Repository

    Cheng, Yichen

    2014-02-01

    Protein structure determination is a very important topic in structural genomics, which helps people to understand varieties of biological functions such as protein-protein interactions, protein–DNA interactions and so on. Nowadays, nuclear magnetic resonance (NMR) has often been used to determine the three-dimensional structures of protein in vivo. This study aims to automate the peak picking step, the most important and tricky step in NMR structure determination. We propose to model the NMR spectrum by a mixture of bivariate Gaussian densities and use the stochastic approximation Monte Carlo algorithm as the computational tool to solve the problem. Under the Bayesian framework, the peak picking problem is casted as a variable selection problem. The proposed method can automatically distinguish true peaks from false ones without preprocessing the data. To the best of our knowledge, this is the first effort in the literature that tackles the peak picking problem for NMR spectrum data using Bayesian method.

  17. Peak-Seeking Control for Trim Optimization

    Data.gov (United States)

    National Aeronautics and Space Administration — Innovators have developed a peak-seeking algorithm that can reduce drag and improve performance and fuel efficiency by optimizing aircraft trim in real time. The...

  18. World uranium production and demand: A review

    International Nuclear Information System (INIS)

    Tauchid, M.; Mueller Kahle, E.

    1993-01-01

    Despite the growing public concern on the use of nuclear energy, nuclear power generation capacity in the world is expected to follow a modest, but positive growth at least during the next two decades. Uranium production needed to fuel these reactors has been below demand since 1985. The WOCA production figure for 1991 is in the order of 27,000 tonnes U which is 39% below the peak production of 1980. With the exception of Australia, all other countries produced less uranium than in the previous year. It is expected that the production figure for 1992 will shrink even further to about 23,000 tonnes U. In-situ leaching uranium production contributed about 16% to the 1991 world production figure, most of which came from Eastern Europe and Central Asia. With the closing of a number of production facilities the relative contribution of in-situ leaching to the world uranium production is expected to grow. Only about 60% of WOCA's reactor related uranium demand for 1991 was supplied from its own production. The remaining 40% was filled from existing inventories and imports from the Russian Federation and China. The estimated gap between the world uranium production and reactor related demand for 1991 is in the order 10,900 tones U or 19.7%. The cumulative requirement for the world reactor related demand to the year 2010 has been estimated to be about 1,270,000 tonnes U. (author). 6 refs, 10 figs

  19. Estimating Reduced Consumption for Dynamic Demand Response

    Energy Technology Data Exchange (ETDEWEB)

    Chelmis, Charalampos [Univ. of Southern California, Los Angeles, CA (United States); Aman, Saima [Univ. of Southern California, Los Angeles, CA (United States); Saeed, Muhammad Rizwan [Univ. of Southern California, Los Angeles, CA (United States); Frincu, Marc [Univ. of Southern California, Los Angeles, CA (United States); Prasanna, Viktor K. [Univ. of Southern California, Los Angeles, CA (United States)

    2015-01-30

    Growing demand is straining our existing electricity generation facilities and requires active participation of the utility and the consumers to achieve energy sustainability. One of the most effective and widely used ways to achieve this goal in the smart grid is demand response (DR), whereby consumers reduce their electricity consumption in response to a request sent from the utility whenever it anticipates a peak in demand. To successfully plan and implement demand response, the utility requires reliable estimate of reduced consumption during DR. This also helps in optimal selection of consumers and curtailment strategies during DR. While much work has been done on predicting normal consumption, reduced consumption prediction is an open problem that is under-studied. In this paper, we introduce and formalize the problem of reduced consumption prediction, and discuss the challenges associated with it. We also describe computational methods that use historical DR data as well as pre-DR conditions to make such predictions. Our experiments are conducted in the real-world setting of a university campus microgrid, and our preliminary results set the foundation for more detailed modeling.

  20. Electric demand and the antinuclear movement

    International Nuclear Information System (INIS)

    Studness, C.M.

    1984-01-01

    The author feels that, with electric demand growth of 4.5 to 5% per year expected, it will be only a matter of time before stepping-up the stream of utility capacity additions becomes an important issue. If demand grows 4.5% per year instead of 2.8% as projected by NERC, demand will be 10% higher and peak reserve margins about 12 percentage points lower than envisioned by the NERC projections after five years. By 1988 or 1989, little or no excess capacity will remain, and the utilities will be faced with adding twice as much capacity annually as now planned to avoid service deterioration. As questions about the adequacy of current utility capacity plans and concerns about service quality move toward center stage, the antinuclear movement should find it increasingly difficult to garner the broad support it now enjoys. Capacity represented by any uncompleted nuclear plants will appear increasingly beneficial, and those who do not have strong antinuclear sentiments should become increasingly hesitant about lending support to the movement. Accordingly, electric demand growth in due course can be expected to drain marginal supporters from the antinuclear movement and thereby erode the movement's vitality

  1. Handling of multiassembly sealed baskets between reactor storage and a remote handling facility

    International Nuclear Information System (INIS)

    Massey, J.V.; Kessler, J.H.; McSherry, A.J.

    1989-06-01

    The storage of multiple fuel assemblies in sealed (welded) dry storage baskets is gaining increasing use to augment at-reactor fuel storage capacity. Since this increasing use will place a significant number of such baskets on reactor sites, some initial downstream planning for their future handling scenarios for retrieving multi-assembly sealed baskets (MSBs) from onsite storage and transferring and shipping the fuel (and/or the baskets) to a federally operated remote handling facility (RHF). Numerous options or at-reactor and away-from-reactor handling were investigated. Materials handling flowsheets were developed along with conceptual designs for the equipment and tools required to handle and open the MSBs. The handling options were evaluated and compared to a reference case, fuel handling sequence (i.e., fuel assemblies are taken from the fuel pool, shipped to a receiving and handling facility and placed into interim storage). The main parameters analyzed are throughout, radiation dose burden and cost. In addition to evaluating the handling of MSBs, this work also evaluated handling consolidated fuel canisters (CFCs). In summary, the handling of MSBs and CFCs in the store, ship and bury fuel cycle was found to be feasible and, under some conditions, to offer significant benefits in terms of throughput, cost and safety. 14 refs., 20 figs., 24 tabs

  2. Safeguards information handling and treatment

    International Nuclear Information System (INIS)

    Carchon, R.; Liu, J.; Ruan, D.

    2001-01-01

    Many states are currently discussing the new additional protocol (INFCIRC/540). This expanded framework is expected to establish the additional confirmation that there are no undeclared activities and facilities in that state. The information collected by the IAEA mainly comes from three different sources: information either provided by the state, collected by the IAEA, and from open sources. This information can be uncertain, incomplete, imprecise, not fully reliable, contradictory, etc. Hence, there is a need for a mathematical framework that provides a basis for handling and treatment of multidimensional information of varying quality. We use a linguistic assessment based on fuzzy set theory, as a flexible and realistic approach. The concept of a linguistic variable serves the purpose of providing a means of approximated characterization of information that may be imprecise, too complex or ill-defined, for which the traditional quantitative approach does not give an adequate answer. In the application of this linguistic assessment approach, a problem arises on how to aggregate linguistic information. Two different approaches can be followed: (1) approximation approach using the associated membership function; (2) symbolic approach acting by the direct computation on labels, where the use of membership function and the linguistic approximation is unnecessary, which makes computation simple and quick. To manipulate the linguistic information in this context, we work with aggregation operators for combining the linguistic non-weighted and weighted values by direct computation on labels, like the Min-type and Max-type weighted aggregation operators as well as the median aggregation operator. A case study on the application of these aggregation operators to the fusion of safeguards relevant information is given. The IAEA Physical Model of the nuclear fuel cycle can be taken as a systematic and comprehensive indicator system. It identifies and describes indicators of

  3. Road infrastructure and demand induction

    DEFF Research Database (Denmark)

    Nielsen, Thomas Alexander Sick; Hovgesen, Henrik Harder; Lahrmann, Harry

    2006-01-01

    a long screenline is used to measure the development in aggregate demand in selected corridors. The paper analyses demand induction by establishing time series of aggregate demand that is compared with the national traffic index. Significant trend breaks in the association between aggregate demand...... in the corridors and the national index, following the opening of motorways or bridges, indicates demand induction by infrastructure expansion in a number of instances. Lack of significant trend breaks following opening year is found in peripheral areas where major population centres are missing. This indicates...... the necessity of some latent demand within suitable travel range for new infrastructure elements to produce significant amounts of induced demand. Estimates of demand induction as a percentage of the realised demand five years after opening are between 10% and 67% for new motorway sections depending...

  4. Feasibility study about handling plant and logistics of rotted spruce for energy and pulpwood; Esiselvitys energia- ja teollisuuspuun kaesittelylaitteistosta ja logistiikasta

    Energy Technology Data Exchange (ETDEWEB)

    Laurila, P [Biowatti Oy, Espoo (Finland)

    1997-12-01

    The aim of this feasibility study is to clarify the handling demands, technical and logistical possibilities, profitabilities both outlays and benefits in combined energy- and pulpwood production from rotted spruce raw material. The results of the study will be taken into consideration, if a handling plant will be decided to build and demonstrate beside the Forssa biomass power plant. (orig.)

  5. Ergonomics: safe patient handling and mobility.

    Science.gov (United States)

    Hallmark, Beth; Mechan, Patricia; Shores, Lynne

    2015-03-01

    This article reviews and investigates the issues surrounding ergonomics, with a specific focus on safe patient handling and mobility. The health care worker of today faces many challenges, one of which is related to the safety of patients. Safe patient handling and mobility is on the forefront of the movement to improve patient safety. This article reviews the risks associated with patient handling and mobility, and informs the reader of current evidence-based practice relevant to this area of care. Copyright © 2015 Elsevier Inc. All rights reserved.

  6. How the NWC handles software as product

    Energy Technology Data Exchange (ETDEWEB)

    Vinson, D.

    1997-11-01

    This tutorial provides a hands-on view of how the Nuclear Weapons Complex project should be handling (or planning to handle) software as a product in response to Engineering Procedure 401099. The SQAS has published the document SQAS96-002, Guidelines for NWC Processes for Handling Software Product, that will be the basis for the tutorial. The primary scope of the tutorial is on software products that result from weapons and weapons-related projects, although the information presented is applicable to many software projects. Processes that involve the exchange, review, or evaluation of software product between or among NWC sites, DOE, and external customers will be described.

  7. Handling of bulk solids theory and practice

    CERN Document Server

    Shamlou, P A

    1990-01-01

    Handling of Bulk Solids provides a comprehensive discussion of the field of solids flow and handling in the process industries. Presentation of the subject follows classical lines of separate discussions for each topic, so each chapter is self-contained and can be read on its own. Topics discussed include bulk solids flow and handling properties; pressure profiles in bulk solids storage vessels; the design of storage silos for reliable discharge of bulk materials; gravity flow of particulate materials from storage vessels; pneumatic transportation of bulk solids; and the hazards of solid-mater

  8. Instream flow needs below peaking hydroelectric projects

    International Nuclear Information System (INIS)

    Milhous, R.T.

    1991-01-01

    This paper reports on a method developed to assist in the determination of instream flow needs below hydroelectric projects operated in a peaking mode. Peaking hydroelectric projects significantly change streamflow over a short period of time; consequently, any instream flow methodology must consider the dual flows associated with peaking projects. The dual flows are the lowest flow and the maximum generation flow of a peaking cycle. The methodology is based on elements of the Physical Habitat Simulation System of the U.S. Fish and Wildlife Service and uses habitat, rather than fish numbers or biomas, as at basic response variable. All aquatic animals are subject to the rapid changes in streamflow which cause rapid swings in habitat quality. Some aquatic organisms are relatively fixed in location in the stream while others can move when flows change. The habitat available from a project operated in peaking mode is considered to be the minimum habitat occurring during a cycle of habitat change. The methodology takes in to consideration that some aquatic animals can move and others cannot move during a peaking cycle

  9. Contribution to performing gas solutions and the complementarity of energies to address electric peak consumptions

    International Nuclear Information System (INIS)

    2015-01-01

    This article aims at outlining the contribution that gas-based solutions may have for the reduction of the seasonal electricity peak consumption. After having recalled the principles related to electricity peak consumption (daily peak in summer and in winter due to the use of various equipment which lasts few hours, seasonal peak in winter due to the use of electric heating which may last several weeks) and the associated evolution of electricity consumptions over the last years, this article describes the main challenges related to the electric peak consumption: how to maintain the balance in real time between production and consumption. In France, the network manager must use, beside nuclear power stations, thermal productions (gas or coal-based) which result in higher CO 2 emissions. Electricity imports from Germany also degrade the French carbon footprint. Thus, the management of daily and seasonal peaks can be based on three levers of action: to act on supply by developing capacities to face the residual peak, to act on demand by smoothing the load curve by controlling the load of electric equipment, or to act on demand by a global reduction of the thermo-sensitive consumption of electricity

  10. Impact of Demand Side Management in Active Distribution Networks

    DEFF Research Database (Denmark)

    Ponnaganti, Pavani; Bak-Jensen, Birgitte; Pillai, Jayakrishnan Radhakrishna

    2017-01-01

    Demand Side Management (DSM) is an efficient flexible program which helps distribution network operators to meet the future critical peak demand. It is executed in cases of not only technical issues like voltage sag or swell, transformer burdening, cable congestions, but also to increase the degree...... of visibility in the electricity markets. The aim of this paper is to find the optimal flexible demands that can be shifted to another time in order to operate the active distribution system within secure operating limits. A simple mechanism is proposed for finding the flexibility of the loads where electric...

  11. IDENTIFICATIONS PEAK HOURS ON INTERSECTIONS SET IN BIELSKO-BIAŁA CITY

    Directory of Open Access Journals (Sweden)

    Marcin KŁOS

    2016-03-01

    Full Text Available Traffic flow in cities is usually examined locally. This method is not effective for through traffic analysis. The paper discusses the problem of determining peak traffic hours taking into account vehicle distributions. Peak hours represent time periods of traffic flow which demand special treatment by traffic control systems. This is particularly important in the case of ITS. High values of traffic flow require relieving actions not only at the junctions but preferably along the transit routes. The north-south transit route in Bielsko-Biała was chosen for analysis. Instead of the usual two distinct peaks it is determined that the traffic flow is characterised by five peaks. This pattern is the result of specific location of the route, which links residential areas, industrial zones and shopping centres besides carrying through traffic. This multi peak graph more accurately models the traffic flow.

  12. Limitation of peak fitting and peak shape methods for determination of activation energy of thermoluminescence glow peaks

    CERN Document Server

    Sunta, C M; Piters, T M; Watanabe, S

    1999-01-01

    This paper shows the limitation of general order peak fitting and peak shape methods for determining the activation energy of the thermoluminescence glow peaks in the cases in which retrapping probability is much higher than the recombination probability and the traps are filled up to near saturation level. Right values can be obtained when the trap occupancy is reduced by using small doses or by post-irradiation partial bleaching. This limitation in the application of these methods has not been indicated earlier. In view of the unknown nature of kinetics in the experimental samples, it is recommended that these methods of activation energy determination should be applied only at doses well below the saturation dose.

  13. Management of transport and handling contracts

    CERN Document Server

    Rühl, I

    2004-01-01

    This paper shall outline the content, application and management strategies for the various contracts related to transport and handling activities. In total, the two sections Logistics and Handling Maintenance are in charge of 27 (!) contracts ranging from small supply contracts to big industrial support contracts. The activities as well as the contracts can generally be divided into four main topics "Vehicle Fleet Management"; "Supply, Installation and Commissioning of Lifting and Hoisting Equipment"; "Equipment Maintenance" and "Industrial Support for Transport and Handling". Each activity and contract requires different approaches and permanent adaptation to the often changing CERN's requirements. In particular, the management and the difficulties experienced with the contracts E072 "Maintenance of lifting and hoisting equipment", F420 "Supply of seven overhead traveling cranes for LHC" and S090/S103 "Industrial support for transport and handling" will be explained in detail.

  14. Travelling cranes for heavy reactor component handling

    International Nuclear Information System (INIS)

    Champeil, M.

    1977-01-01

    Structure and operating machinery of two travelling cranes (600 t and 450 t) used in the Framatome factory for handling heavy reactor components are described. When coupled, these cranes can lift loads up to 1000 t [fr

  15. Remote handling for an ISIS target change

    International Nuclear Information System (INIS)

    Broome, T.A.; Holding, M.

    1989-01-01

    During 1987 two ISIS targets were changed. This document describes the main features of the remote handling aspects of the work. All the work has to be carried out using remote handling techniques. The radiation level measured on the surface of the reflector when the second target had been removed was about 800 mGy/h demonstrating that hands on operations on any part of the target reflector moderator assembly is not practical. The target changes were the first large scale operations in the Target Station Remote Handling Cell and a great deal was learned about both equipment and working practices. Some general principles emerged which are applicable to other active handling tasks on facilities like ISIS and these are discussed below. 8 figs

  16. Aerobot Sampling and Handling System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Honeybee Robotics proposes to: ?Derive and document the functional and technical requirements for Aerobot surface sampling and sample handling across a range of...

  17. Data handling systems and methods of wiring

    International Nuclear Information System (INIS)

    Grant, J.

    1981-01-01

    An improved data handling system, for monitoring and control of nuclear reactor operations, is described in which time delays associated with scanning are reduced and noise and fault signals in the system are resolved. (U.K.)

  18. Harvesting and handling agricultural residues for energy

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, B.M.; Summer, H.R.

    1986-05-01

    Significant progress in understanding the needs for design of agricultural residue collection and handling systems has been made but additional research is required. Recommendations are made for research to (a) integrate residue collection and handling systems into general agricultural practices through the development of multi-use equipment and total harvest systems; (b) improve methods for routine evaluation of agricultural residue resources, possibly through remote sensing and image processing; (c) analyze biomass properties to obtain detailed data relevant to engineering design and analysis; (d) evaluate long-term environmental, social, and agronomic impacts of residue collection; (e) develop improved equipment with higher capacities to reduce residue collection and handling costs, with emphasis on optimal design of complete systems including collection, transportation, processing, storage, and utilization; and (f) produce standard forms of biomass fuels or products to enhance material handling and expand biomass markets through improved reliability and automatic control of biomass conversion and other utilization systems. 118 references.

  19. Handling of disused radioactive materials in Ecuador

    International Nuclear Information System (INIS)

    Benitez, Manuel

    1999-10-01

    This paper describes the handling of disused radioactive sources. It also shows graphic information of medical and industrial equipment containing radioactive sources. This information was prepared as part of a training course on radioactive wastes. (The author)

  20. Foster parenting, human imprinting and conventional handling ...

    African Journals Online (AJOL)

    p2492989

    Foster parenting, human imprinting and conventional handling affects survival and early .... bird may subsequently direct its sexual attention to those humans on whom it was imprinted (Bubier et al., ..... The mind through chicks' eyes: memory,.

  1. Task demand, task management, and teamwork

    Energy Technology Data Exchange (ETDEWEB)

    Braarud, Per Oeivind; Brendryen, Haavar

    2001-03-15

    The current approach to mental workload assessment in process control was evaluated in 3 previous HAMMLAB studies, by analysing the relationship between workload related measures and performance. The results showed that subjective task complexity rating was related to team's control room performance, that mental effort (NASA-TLX) was weakly related to performance, and that overall activity level was unrelated to performance. The results support the argument that general cognitive measures, i.e., mental workload, are weakly related to performance in the process control domain. This implies that other workload concepts than general mental workload are needed for valid assessment of human reliability and for valid assessment of control room configurations. An assessment of task load in process control suggested that how effort is used to handle task demand is more important then the level of effort invested to solve the task. The report suggests two main workload related concepts with a potential as performance predictors in process control: task requirements, and the work style describing how effort is invested to solve the task. The task requirements are seen as composed of individual task demand and team demand. In a similar way work style are seen as composed of individual task management and teamwork style. A framework for the development of the concepts is suggested based on a literature review and experiences from HAMMLAB research. It is suggested that operational definitions of workload concepts should be based on observable control room behaviour, to assure a potential for developing performance-shaping factors. Finally an explorative analysis of teamwork measures and performance in one study indicated that teamwork concepts are related to performance. This lends support to the suggested development of team demand and teamwork style as elements of a framework for the analysis of workload in process control. (Author)

  2. Battery Peak Power Shaving Strategy to Prolong Battery Life for Electric Buses

    NARCIS (Netherlands)

    Pham, T.H.; Rosea, B.; Wilkins, S.

    2016-01-01

    This paper presents a battery peak power shaving strategy for battery electric buses. The developed strategy restricts the battery charge/discharge power when the propulsion power demand is high to avoid high deterioration of the battery capacity during operation. Without reducing the propulsion

  3. Reducing electricity consumption peaks with parametrised dynamic pricing strategies given maximal unit prices

    NARCIS (Netherlands)

    N.F. Höning (Nicolas); J.A. La Poutré (Han); F. Lopes; Z. Vale; J. Sousa; H. Coelho

    2013-01-01

    htmlabstractDemand response is a crucial mechanism for flattening of peak loads. For its implementation, we not only require consumers who react to price changes, but also intelligent strategies to select prices. We propose a parametrised meta-strategy for dynamic pricing and identify suitable

  4. Analysis of the same day of the week increases in peak electricity ...

    African Journals Online (AJOL)

    Modelling of the same day of the week increases in peak electricity demand improves the reliability of a power network if an accurate assessment of the level and frequency of future extreme load forecasts is carried out. Key words: Gibbs sampling, generalized single pareto, generalized pareto distribution, pareto quantile ...

  5. Energy demand on dairy farms in Ireland.

    Science.gov (United States)

    Upton, J; Humphreys, J; Groot Koerkamp, P W G; French, P; Dillon, P; De Boer, I J M

    2013-10-01

    Reducing electricity consumption in Irish milk production is a topical issue for 2 reasons. First, the introduction of a dynamic electricity pricing system, with peak and off-peak prices, will be a reality for 80% of electricity consumers by 2020. The proposed pricing schedule intends to discourage energy consumption during peak periods (i.e., when electricity demand on the national grid is high) and to incentivize energy consumption during off-peak periods. If farmers, for example, carry out their evening milking during the peak period, energy costs may increase, which would affect farm profitability. Second, electricity consumption is identified in contributing to about 25% of energy use along the life cycle of pasture-based milk. The objectives of this study, therefore, were to document electricity use per kilogram of milk sold and to identify strategies that reduce its overall use while maximizing its use in off-peak periods (currently from 0000 to 0900 h). We assessed, therefore, average daily and seasonal trends in electricity consumption on 22 Irish dairy farms, through detailed auditing of electricity-consuming processes. To determine the potential of identified strategies to save energy, we also assessed total energy use of Irish milk, which is the sum of the direct (i.e., energy use on farm) and indirect energy use (i.e., energy needed to produce farm inputs). On average, a total of 31.73 MJ was required to produce 1 kg of milk solids, of which 20% was direct and 80% was indirect energy use. Electricity accounted for 60% of the direct energy use, and mainly resulted from milk cooling (31%), water heating (23%), and milking (20%). Analysis of trends in electricity consumption revealed that 62% of daily electricity was used at peak periods. Electricity use on Irish dairy farms, therefore, is substantial and centered around milk harvesting. To improve the competitiveness of milk production in a dynamic electricity pricing environment, therefore, management

  6. 30o inclination in handles of plastic boxes can reduce postural and muscular workload during handling

    Directory of Open Access Journals (Sweden)

    Luciana C. C. B. Silva

    2013-06-01

    Full Text Available BACKGROUND: The handling of materials, which occurs in the industrial sector, is associated with lesions on the lumbar spine and in the upper limbs. Inserting handles in industrial boxes is a way to reduce work-related risks. Although the position and angle of the handles are significant factors in comfort and safety during handling, these factors have rarely been studied objectively. OBJECTIVE: To compare the handling of a commercial box and prototypes with handles and to evaluate the effects on upper limb posture, muscle electrical activity, and perceived acceptability using different grips while handling materials from different heights. METHOD: Thirty-seven healthy volunteers evaluated the handles of prototypes that allowed for changes in position (top and bottom and angle (0°, 15°, and 30°. Wrist, elbow, and shoulder movements were evaluated using electrogoniometry and inclinometry. The muscle electrical activity in the wrist extensors, biceps brachii, and the upper portion of the trapezius was measured using a portable electromyographer. The recorded data on muscle movements and electrical activity were synchronized. Subjective evaluations of acceptability were evaluated using a visual analog scale. RESULTS AND CONCLUSIONS: The prototypes with handles at a 30° angle produced the highest acceptability ratings, more neutral wrist positions, lower levels of electromyographic activity for the upper trapezius, and lower elevation angles for the arms. The different measurement methods were complementary in evaluating the upper limbs during handling.

  7. Regulatory process for material handling equipment

    International Nuclear Information System (INIS)

    Rajendran, S.; Agarwal, Kailash

    2017-01-01

    Atomic Energy (Factories) Rules (AEFR) 1996, Rule 35 states, 'Thorough inspection and load testing of a Crane shall be done by a Competent Person at least once every 12 months'. To adhere to this rule, BARC Safety Council constituted 'Material Handling Equipment Committee (MHEC)' under the aegis of Conventional Fire and Safety Review Committee (CFSRC) to carry out periodical inspection and certification of Material Handling Equipment (MHE), tools and tackles used in BARC Facilities at Trombay, Tarapur and Kalpakkam

  8. Stud bolt handling equipment for reactor vessel

    International Nuclear Information System (INIS)

    Bunyan, T.W.

    1989-01-01

    Reactor vessel stud bolt handling equipment includes means for transferring a stud bolt to a carrier from a parking station, or vice versa. Preferably a number of stud bolts are handled simultaneously. The transfer means may include cross arms rotatable about extendable columns, and the equipment is mounted on a mobile base for movement into and out of position. Each carrier comprises a tubular socket and an expandable sleeve to grip a stud bolt. (author)

  9. Testing of FFTF fuel handling equipment

    International Nuclear Information System (INIS)

    Coleman, D.W.; Grazzini, E.D.; Hill, L.F.

    1977-07-01

    The Fast Flux Test Facility has several manual/computer controlled fuel handling machines which are exposed to severe environments during plant operation but still must operate reliably when called upon for reactor refueling. The test programs for two such machines--the Closed Loop Ex-Vessel Machine and the In-Vessel Handling Machine--are described. The discussion centers on those areas where design corrections or equipment repairs substantiated the benefits of a test program prior to plant operation

  10. Human factors issues in fuel handling

    International Nuclear Information System (INIS)

    Beattie, J.D.; Iwasa-Madge, K.M.; Tucker, D.A.

    1994-01-01

    The staff of the Atomic Energy Control Board wish to further their understanding of human factors issues of potential concern associated with fuel handling in CANDU nuclear power stations. This study contributes to that objective by analysing the role of human performance in the overall fuel handling process at Ontario Hydro's Darlington Nuclear Generating Station, and reporting findings in several areas. A number of issues are identified in the areas of design, operating and maintenance practices, and the organizational and management environment

  11. About brachytherapy for the handling of cancer

    International Nuclear Information System (INIS)

    Campos, Tarcisio P.R.; Silva, Nilton O.; Damaso, Renato S.; Costa, Helder R.; Borges, Paulo H.R.; Mendes, Bruno M.

    2000-01-01

    The technique of brachytherapy is argued in this article. The 'hardware' and 'necessary software' for the handling are summarily presented. Being the macro-dosimetry an important stage in the radiation therapy procedure, a simplified method of doses evaluation in conventional brachytherapy is presented. In an illustrative form, isodoses of a three-dimensional distribution of linear sources are drawn on a digitalized X-ray picture, exemplifying the handling of breast brachytherapy by sources of iridium

  12. Development of standard components for remote handling

    International Nuclear Information System (INIS)

    Taguchi, Kou; Kakudate, Satoshi; Nakahira, Masataka; Ito, Akira

    1998-01-01

    The core of Fusion Experimental Reactor consists of various components such as superconducting magnets and forced-cooled in-vessel components, which are remotely maintained due to intense of gamma radiation. Mechanical connectors such as cooling pipe connections, insulation joints and electrical connectors are commonly used for maintenance of these components and have to be standardized in terms of remote handling. This paper describes these mechanical connectors developed as the standard component compatible with remote handling and tolerable for radiation. (author)

  13. Development of standard components for remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Taguchi, Kou; Kakudate, Satoshi; Nakahira, Masataka; Ito, Akira [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The core of Fusion Experimental Reactor consists of various components such as superconducting magnets and forced-cooled in-vessel components, which are remotely maintained due to intense of gamma radiation. Mechanical connectors such as cooling pipe connections, insulation joints and electrical connectors are commonly used for maintenance of these components and have to be standardized in terms of remote handling. This paper describes these mechanical connectors developed as the standard component compatible with remote handling and tolerable for radiation. (author)

  14. Safety Training: "Manual Handling" course in September

    CERN Multimedia

    Safety Training, HSE Unit

    2016-01-01

    The next "Manual Handling" course will be given, in French, on 26 September 2016. This course is designed for anyone required to carry out manual handling of loads in the course of their work.   The main objective of this course is to adopt and apply the basic principles of physical safety and economy of effort. There are places available. If you are interested in following this course, please fill an EDH training request via our catalogue. 

  15. Demand for male contraception.

    Science.gov (United States)

    Dorman, Emily; Bishai, David

    2012-10-01

    The biological basis for male contraception was established decades ago, but despite promising breakthroughs and the financial burden men increasingly bear due to better enforcement of child support policies, no viable alternative to the condom has been brought to market. Men who wish to control their fertility must rely on female compliance with contraceptives, barrier methods, vasectomy or abstinence. Over the last 10 years, the pharmaceutical industry has abandoned most of its investment in the field, leaving only nonprofit organisations and public entities pursuing male contraception. Leading explanations are uncertain forecasts of market demand pitted against the need for critical investments to demonstrate the safety of existing candidate products. This paper explores the developments and challenges in male contraception research. We produce preliminary estimates of potential market size for a safe and effective male contraceptive based on available data to estimate the potential market for a novel male method.

  16. Animating the Ethical Demand

    DEFF Research Database (Denmark)

    Vistisen, Peter; Jensen, Thessa; Poulsen, Søren Bolvig

    2015-01-01

    This paper addresses the challenge of attaining ethical user stances during the design process of products and services and proposes animation-based sketching as a design method, which supports elaborating and examining different ethical stances towards the user. The discussion is qualified...... by an empirical study of Responsible Research and Innovation (RRI) in a Triple Helix constellation. Using a three-week long innovation workshop, U- CrAc, involving 16 Danish companies and organisations and 142 students as empirical data, we discuss how animation-based sketching can explore not yet existing user...... dispositions, as well as create an incentive for ethical conduct in development and innovation processes. The ethical fulcrum evolves around Løgstrup’s Ethical Demand and his notion of spontaneous life manifestations. From this, three ethical stances are developed; apathy, sympathy and empathy. By exploring...

  17. Rewarding yet demanding

    DEFF Research Database (Denmark)

    Bjørkedal, S T B; Torsting, A M B; Møller, T

    2016-01-01

    in a logbook. The Canadian Occupational Performance Measure was used to initiate and guide the intervention and the Canadian Model of Client-Centred Enablement for the client-therapist relationship. RESULTS: Participants described the intervention, which presupposed a certain level of patient readiness...... design comprising an eight-week client-centred occupational therapy intervention with semi-structured interviews with five of the six clients out of 10 who completed the intervention. Braun and Clark's thematic analysis was applied to the transcripts. Adherence rate and dropouts were recorded......, as demanding. Participants valued engaging in real-life occupations while anchoring new strategies but also the occupational therapist's role in dealing with failure. Participants felt the intervention assisted in their recovery process and enabled them to engage in meaningful occupations. CONCLUSION...

  18. PROOF on Demand

    International Nuclear Information System (INIS)

    Malzacher, Peter; Manafov, Anar

    2010-01-01

    PROOF on Demand (PoD) is a set of utilities, which allows starting a PROOF cluster at user request, on any resource management system. It provides a plug-in based system, which allows to use different job submission frontends, such as LSF or gLite WMS. Main components of PoD are the PROOFAgent and the PAConsole. PROOFAgent provides the communication layer between the PROOF master on the local machine and the PROOF workers on the remote resources, possibly behind a firewall. PAConsole provides a user-friendly GUI, which is used to setup, manage, and shutdown the dynamic PROOF cluster. Installation is simple and doesn't require administrator privileges, and all the processes run in user space. PoD gives users, who don't have a centrally-administrated static PROOF cluster at their institute, the possibility to enjoy the full power of interactive analysis with PROOF.

  19. Radiation-tolerant cable management systems for remote handling applications in the nuclear industry

    International Nuclear Information System (INIS)

    Cullen, S.; Thom, M.

    1993-01-01

    Experience has shown that one of the most vulnerable areas within remote handling equipment is the umbilical cable and termination system. Repairs of a damaged system can be very long due to poorly designed termination techniques. Over the past five years W.L. Gore has gained considerable experience in the design and manufacture of cable systems, utilising unique radiation tolerant materials and manufacturing processes. The cable systems manufactured at the W.L. Gore, Dunfermline, Scotland facility have proven to give excellent performance in the most demanding of remote handling applications. (author)

  20. Electric energy demand and supply prospects for California

    Science.gov (United States)

    Jones, H. G. M.

    1978-01-01

    A recent history of electricity forecasting in California is given. Dealing with forecasts and regulatory uncertainty is discussed. Graphs are presented for: (1) Los Angeles Department of Water and Power and Pacific Gas and Electric present and projected reserve margins; (2) California electricity peak demand forecast; and (3) California electricity production.

  1. Operation manual for EDXRDDA - a software package for Bragg peak analysis of energy dispersive powder X-ray diffraction data

    International Nuclear Information System (INIS)

    Jayaswal, Balhans; Vijaykumar, V.; Momin, S.N.; Sikka, S.K.

    1992-01-01

    EDXRDDA is a software package for analysis of raw data for energy dispersive x-ray diffraction from powder samples. It resolves the spectra into individual peaks by a constrained non-linear least squares method (Hughes and Sexton, 1988). The profile function adopted is the Gaussian/Lorentzian product with the mixing ratio refinable in the program. The program is implemented on an IBM PC and is highly interactive with extensive plotting facilities. This report is a user's guide for running the program. In the first step after inputting the spectra, the full spectra is plotted on the screen. The user then chooses a portion of this for peak resolution. The initial guess for the peak intensity, peak position are input with the help of a cursor or a mouse. Upto twenty peaks can be fitted at a time in an interval of 500 channels. For overlapping peaks, various constraints can be applied. Bragg peaks and fluorescence peaks with different half widths can be handled simultaneously. The program on execution produces a look up table which contains the refined values of the peak position, half width, peak intensity, integrated intensity, and their error estimates of each peak. The program is very general and can also be used for curve fitting of data from many other experiments. (author). 2 refs., 7 figs., 2 appendices

  2. Specialization and Flexibility in Port Cargo Handling

    Directory of Open Access Journals (Sweden)

    Hakkı KİŞİ

    2016-11-01

    Full Text Available Cargo handling appears to be the fundamental function of ports. In this context, the question of type of equipment and capacity rate need to be tackled with respect to cargo handling principles. The purpose of this study is to discuss the types of equipment to be used in ports, relating the matter to costs and capacity. The question is studied with a basic economic theoretical approach. Various conditions like port location, size, resources, cargo traffic, ships, etc. are given parameters to dictate the type and specification of the cargo handling equipment. Besides, a simple approach in the context of cost capacity relation can be useful in deciding whether to use specialized or flexible equipment. Port equipment is sometimes expected to be flexible to handle various types of cargo as many as possible and sometimes to be specialized to handle one specific type of cargo. The cases that might be suitable for those alternatives are discussed from an economic point of view in this article. Consequently, effectiveness and efficiency criteria play important roles in determining the handling equipment in ports.

  3. Religious Serpent Handling and Community Relations.

    Science.gov (United States)

    Williamson, W Paul; Hood, Ralph W

    2015-01-01

    Christian serpent handling sects of Appalachia comprise a community that has long been mischaracterized and marginalized by the larger communities surrounding them. To explore this dynamic, this article traces the emergence of serpent handling in Appalachia and the emergence of anti-serpent-handling state laws, which eventually failed to curb the practice, as local communities gave serpent handling groups support. We present two studies to consider for improving community relations with serpent handling sects. In study 1, we present data relating the incidence of reported serpent-bite deaths with the rise of anti-serpent-handling laws and their eventual abatement, based on increasing acceptance of serpent handlers by the larger community. Study 2 presents interview data on serpent bites and death that provide explanations for these events from the cultural and religious perspective. We conclude that first-hand knowledge about serpent handlers, and other marginalized groups, helps to lessen suspicion and allows them to be seen as not much different, which are tendencies that are important for promoting inter-community harmony.

  4. Statistics of peaks of Gaussian random fields

    International Nuclear Information System (INIS)

    Bardeen, J.M.; Bond, J.R.; Kaiser, N.; Szalay, A.S.; Stanford Univ., CA; California Univ., Berkeley; Cambridge Univ., England; Fermi National Accelerator Lab., Batavia, IL)

    1986-01-01

    A set of new mathematical results on the theory of Gaussian random fields is presented, and the application of such calculations in cosmology to treat questions of structure formation from small-amplitude initial density fluctuations is addressed. The point process equation is discussed, giving the general formula for the average number density of peaks. The problem of the proper conditional probability constraints appropriate to maxima are examined using a one-dimensional illustration. The average density of maxima of a general three-dimensional Gaussian field is calculated as a function of heights of the maxima, and the average density of upcrossing points on density contour surfaces is computed. The number density of peaks subject to the constraint that the large-scale density field be fixed is determined and used to discuss the segregation of high peaks from the underlying mass distribution. The machinery to calculate n-point peak-peak correlation functions is determined, as are the shapes of the profiles about maxima. 67 references

  5. Peak Oil, threat or energy worlds' phantasm?

    International Nuclear Information System (INIS)

    Favennec, Jean-Pierre

    2011-01-01

    The concept of Peak Oil is based on the work of King Hubbert, a petroleum geologist who worked for Shell in the USA in the 1960's. Based on the fact that discoveries in America reached a maximum in the 1930's, he announced that American production would reach a maximum in 1969, which did actually occur. Geologists members of the Association for the Study of Peak Oil have extrapolated this result to a worldwide scale and, since oil discoveries reached a peak in the 1960's, argued that production will peak in the very near future. It is clear that hydrocarbon reserves are finite and therefore exhaustible. But little is known regarding the level of ultimate (i.e. total existing) reserves. There are probably very large reserves of non conventional oil in addition to the reserves of conventional oil. An increasing number of specialists put maximum production at less than 100 Mb/d more for geopolitical than physical reasons. Attainable peak production will probably vary from year to year and will depend on how crude oil prices develop

  6. Home Network Technologies and Automating Demand Response

    Energy Technology Data Exchange (ETDEWEB)

    McParland, Charles

    2009-12-01

    Over the past several years, interest in large-scale control of peak energy demand and total consumption has increased. While motivated by a number of factors, this interest has primarily been spurred on the demand side by the increasing cost of energy and, on the supply side by the limited ability of utilities to build sufficient electricity generation capacity to meet unrestrained future demand. To address peak electricity use Demand Response (DR) systems are being proposed to motivate reductions in electricity use through the use of price incentives. DR systems are also be design to shift or curtail energy demand at critical times when the generation, transmission, and distribution systems (i.e. the 'grid') are threatened with instabilities. To be effectively deployed on a large-scale, these proposed DR systems need to be automated. Automation will require robust and efficient data communications infrastructures across geographically dispersed markets. The present availability of widespread Internet connectivity and inexpensive, reliable computing hardware combined with the growing confidence in the capabilities of distributed, application-level communications protocols suggests that now is the time for designing and deploying practical systems. Centralized computer systems that are capable of providing continuous signals to automate customers reduction of power demand, are known as Demand Response Automation Servers (DRAS). The deployment of prototype DRAS systems has already begun - with most initial deployments targeting large commercial and industrial (C & I) customers. An examination of the current overall energy consumption by economic sector shows that the C & I market is responsible for roughly half of all energy consumption in the US. On a per customer basis, large C & I customers clearly have the most to offer - and to gain - by participating in DR programs to reduce peak demand. And, by concentrating on a small number of relatively

  7. SPANISH PEAKS WILDERNESS STUDY AREA, COLORADO.

    Science.gov (United States)

    Budding, Karin E.; Kluender, Steven E.

    1984-01-01

    A geologic and geochemical investigation and a survey of mines and prospects were conducted to evaluate the mineral-resource potential of the Spanish Peaks Wilderness Study Area, Huerfano and Las Animas Counties, in south-central Colorado. Anomalous gold, silver, copper, lead, and zinc concentrations in rocks and in stream sediments from drainage basins in the vicinity of the old mines and prospects on West Spanish Peak indicate a substantiated mineral-resource potential for base and precious metals in the area surrounding this peak; however, the mineralized veins are sparse, small in size, and generally low in grade. There is a possibility that coal may underlie the study area, but it would be at great depth and it is unlikely that it would have survived the intense igneous activity in the area. There is little likelihood for the occurrence of oil and gas because of the lack of structural traps and the igneous activity.

  8. Analysis of fuel end-temperature peaking

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Z.; Jiang, Q.; Lai, L.; Shams, M. [CANDU Energy Inc., Fuel Engineering Dept., Mississauga, Ontario (Canada)

    2013-07-01

    During normal operation and refuelling of CANDU® fuel, fuel temperatures near bundle ends will increase due to a phenomenon called end flux peaking. Similar phenomenon would also be expected to occur during a postulated large break LOCA event. The end flux peaking in a CANDU fuel element is due to the fact that neutron flux is higher near a bundle end, in contact with a neighbouring bundle or close to heavy water coolant, than in the bundle mid-plane, because of less absorption of thermal neutrons by Zircaloy or heavy water than by the UO{sub 2} material. This paper describes Candu Energy experience in analysing behaviour of bundle due to end flux peaking using fuel codes FEAT, ELESTRES and ELOCA. (author)

  9. Demand response in Indian electricity market

    International Nuclear Information System (INIS)

    Siddiqui, Md Zakaria; Maere d'Aertrycke, Gauthier de; Smeers, Yves

    2012-01-01

    This paper outlines a methodology for implementing cost of service regulation in retail market for electricity in India when wholesale market is liberalised and operates through an hourly spot market. As in a developing country context political considerations make tariff levels more important than supply security, satisfying the earmarked level of demand takes a back seat. Retail market regulators are often forced by politicians to keep the retail tariff at suboptimal level. This imposes budget constraint on distribution companies to procure electricity that it requires to meet the earmarked level of demand. This is the way demand response is introduced in the system and has its impact on spot market prices. We model such a situation of not being able to serve the earmarked demand as disutility to the regulator which has to be minimised and we compute associated equilibrium. This results in systematic mechanism for cutting loads. We find that even a small cut in ability of the distribution companies to procure electricity from the spot market has profound impact on the prices in the spot market. - Highlights: ► Modelling the impact of retail tariff in different states on spot prices of electricity in India. ► Retail tariffs are usually fixed below appropriate levels by states due to political reasons. ► Due to revenue constraint distribution utility withdraws demand from spot market in peak hours. ► This adversely affects the scarcity rent of generators and subsequently future investment. ► We show possibility of strategic behaviour among state level regulators in setting retail tariff.

  10. Combined application of Product Lifecycle and Software Configuration Management systems for ITER remote handling

    International Nuclear Information System (INIS)

    Muhammad, Ali; Esque, Salvador; Aha, Liisa; Mattila, Jouni; Siuko, Mikko; Vilenius, Matti; Jaervenpaeae, Jorma; Irving, Mike; Damiani, Carlo; Semeraro, Luigi

    2009-01-01

    The advantages of Product Lifecycle Management (PLM) systems are widely understood among the industry and hence a PLM system is already in use by International Thermonuclear Experimental Reactor (ITER) Organization (IO). However, with the increasing involvement of software in the development, the role of Software Configuration Management (SCM) systems have become equally important. The SCM systems can be useful to meet the higher demands on Safety Engineering (SE), Quality Assurance (QA), Validation and Verification (V and V) and Requirements Management (RM) of the developed software tools. In an experimental environment, such as ITER, the new remote handling requirements emerge frequently. This means the development of new tools or the modification of existing tools and the development of new remote handling procedures or the modification of existing remote handling procedures. PLM and SCM systems together can be of great advantage in the development and maintenance of such remote handling system. In this paper, we discuss how PLM and SCM systems can be integrated together and play their role during the development and maintenance of ITER remote handling system. We discuss the possibility to investigate such setup at DTP2 (Divertor Test Platform 2), which is the full scale mock-up facility to verify the ITER divertor remote handling and maintenance concepts.

  11. A Novel Prosumer-Based Energy Sharing and Management (PESM) Approach for Cooperative Demand Side Management (DSM) in Smart Grid

    OpenAIRE

    Sohail Razzaq; Rehman Zafar; Naveed Ahmed Khan; Asif Raza Butt; Anzar Mahmood

    2016-01-01

    Increasing population and modern lifestyle have raised energy demands globally. Demand Side Management (DSM) is one important tool used to manage energy demands. It employs an advanced power infrastructure along with bi-directional information flow among utilities and users in order to achieve a balanced load curve and minimize demand-supply mismatch. Traditionally, this involves shifting the electricity demand from peak hours to other times of the day in an optimized manner. Multiple users e...

  12. Demand Side Management for the European Supergrid: Occupancy variances of European single-person households

    International Nuclear Information System (INIS)

    Torriti, Jacopo

    2012-01-01

    The prospect of a European Supergrid calls for research on aggregate electricity peak demand and Europe-wide Demand Side Management. No attempt has been made as yet to represent a time-related demand curve of residential electricity consumption at the European level. This article assesses how active occupancy levels of single-person households vary in single-person household in 15 European countries. It makes use of occupancy time-series data from the Harmonised European Time Use Survey database to build European occupancy curves; identify peak occupancy periods; construct time-related electricity demand curves for TV and video watching activities and assess occupancy variances of single-person households. - Highlights: ► Morning peak occupancies of European single households tale place between 7h30 and 7h40. ► Evening peaks take place between 20h10 and 20h20. ► TV and video activities during evening peaks make up about 3.1 GWh of European peak electricity load. ► Baseline and peak occupancy variances vary across countries. ► Baseline and peak occupancy variances can be used as input for Demand Side Management choices.

  13. Demand for power in Calcutta Electricity Supply Corporation area

    Energy Technology Data Exchange (ETDEWEB)

    Banerjee, N

    1980-07-01

    Since the early 1970's there has been a continuous crisis of power supply to the Calcutta industrial region. Historical records show that only the peak demand has grown and has a potential for growth, which, with an unchanging base demand, results in a low load factor and consequently inefficient power system operation. Attempts to shift industrial loads by operating industrial plants during non-peak hours are described. Adverse economic conditions eliminated the need for extra working shifts. It is concluded that the power system supplying the Calcutta region has an insufficient peak load generating capacity and an uneconomic load curve and that stricter hourly schedules for power use by industries should be adhered to in order to minimize these problems. (LCL)

  14. Options and processes for spent catalyst handling and utilization.

    Science.gov (United States)

    Marafi, M; Stanislaus, A

    2003-07-18

    The quantity of spent hydroprocessing catalysts discarded as solid wastes in the petroleum refining industries has increased remarkably in recent years due to a rapid growth in the hydroprocessing capacity to meet the rising demand for low-sulfur fuels. Due to their toxic nature, spent hydroprocessing catalysts have been branded as hazardous wastes, and the refiners are experiencing pressure from environmental authorities to handle them safely. Several alternative methods such as reclamation of metals, rejuvenation and reuse, disposal in landfills and preparation of useful materials using spent catalysts as raw materials are available to deal with the spent catalyst problem. The technical feasibility as well as the environmental and economic aspects of these options are reviewed. In addition, details of two bench-scale processes, one for rejuvenation of spent hydroprocessing catalysts, and the other for producing non-leachable synthetic aggregate materials that were developed in this laboratory, are presented in this paper.

  15. Preoperational checkout of the remote-handled transuranic waste handling at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1987-09-01

    This plan describes the preoperational checkout for handling Remote-Handled Transuranic (RH-TRU) Wastes from their receipt at the Waste Isolation Pilot Plant (WIPP) to their emplacement underground. This plan identifies the handling operations to be performed, personnel groups responsible for executing these operations, and required equipment items. In addition, this plan describes the quality assurance that will be exercised throughout the checkout, and finally, it establishes criteria by which to measure the success of the checkout. 7 refs., 5 figs

  16. Radiological safety aspects of handling plutonium

    International Nuclear Information System (INIS)

    Sundararajan, A.R.

    2016-01-01

    Department of Atomic Energy in its scheme of harnessing the nuclear energy for electrical power generation and strategic applications has given a huge role to utilization of plutonium. In the power production programme, fast reactors with plutonium as fuel are expected to play a major role. This would require establishing fuel reprocessing plants to handle both thermal and fast reactor fuels. So in the nuclear fuel cycle facilities variety of chemical, metallurgical, mechanical operations have to be carried out involving significant inventories of "2"3"9 Pu and associated radionuclides. Plutonium is the most radiotoxic radionuclide and therefore any facility handling it has to be designed and operated with utmost care. Two problems of major concern in the protection of persons working in plutonium handling facilities are the internal exposure to the operating personnel from uptake of plutonium and transplutonic nuclides as they are highly radiotoxic and the radiation exposure of hands and eye lens during fuel fabrication operations especially while handling recycled high burn up plutonium. In view of the fact that annual limit for intake is very small for "2"3"9Pu and its radiation emission characteristics are such that it is a huge challenge for the health physicists to detect Pu in air and in workers. This paper discusses the principles and practices followed in providing radiological surveillance to workers in plutonium handling areas. The challenges in protecting the workers from receiving exposures to hands and eye lens in handling high burn up plutonium are also discussed. The sites having Pu fuel cycle facilities should have trained medical staff to handle cases involving excessive intake of plutonium. (author)

  17. Full scale tests on remote handled FFTF fuel assembly waste handling and packaging

    International Nuclear Information System (INIS)

    Allen, C.R.; Cash, R.J.; Dawson, S.A.; Strode, J.N.

    1986-01-01

    Handling and packaging of remote handled, high activity solid waste fuel assembly hardware components from spent FFTF reactor fuel assemblies have been evaluated using full scale components. The demonstration was performed using FFTF fuel assembly components and simulated components which were handled remotely using electromechanical manipulators, shielding walls, master slave manipulators, specially designed grapples, and remote TV viewing. The testing and evaluation included handling, packaging for current and conceptual shipping containers, and the effects of volume reduction on packing efficiency and shielding requirements. Effects of waste segregation into transuranic (TRU) and non-transuranic fractions also are discussed

  18. Remote handling and automation in back end of fuel cycle

    International Nuclear Information System (INIS)

    Nair, K.N.S.

    2010-01-01

    Full text: Indian nuclear programme is readying for a quantum leap and it is essential that technology is available for building advanced fuel recycle plants in the back end and for sustained operation of such plants. Remote technology and automation plays a big role to achieve this goal. With the introduction of advanced fuel cycles in indigenous programme and scenario of international cooperation it is essential to be ready with indigenous technology for meeting all challenges. Work has been progressing to develop locally support technology for remote handling and automation with good success. Essential RH tools such as master slave manipulators, power manipulators and hot cell viewing systems have been developed and commercial production has been established. Customised RH requirements for back end plants have been met and the designs have proven to be worthy for hot operations over the years. In the last few years stress has been on development of equipment and technology to meet the increasing demands of higher throughput plants. Substantial progress has been achieved in the head end and reconversion laboratory systems of reprocessing plants. Similarly successful efforts have also been made for establishing Thoria processing cells and also the RH in the reconversion operations. Custom designed equipment has been developed for decommissioning of ceramic melter, used glove boxes etc. Efforts are on hand to develop automated RH equipment for material handling in underground repositories. This paper aims at bringing out the theme based on some of our own experiences and some reports from plants in operation abroad. (author)

  19. Environment-quality demands

    International Nuclear Information System (INIS)

    Delfini, M.G.; Leenhouts, H.P.

    1988-12-01

    In the framework of the Environment Quality Requirements (MKE) project a model has been designed in which environment-quality demands have been defined and quantified, and a measuring strategy has been developed. In the model it is required for the quality of the environment that the radionuclide concentration in the various environment compartiments remains limited in order to keep the effective dose equivalence for the 'reference man' under a certain reference level. In order to be able to determine the maximum nuclide concentration it is necessary to quantify the relation between the concentration in the environment and the dose for the people. The quantitative relation between concentration and dose has been established on the base of parameters (Derived Activity Limits (DAL's) which have to be calculated for each environment compartiment, each nuclide and each exposure pathway. This model has been described and, as example, the DAL's have been calculated for the compartiment air (for which the two exposure pathways inhalation and direct radiation were considered). For the other environment compartiments a similar elaboration is needed. The feasibility of application of the MKE-model in the actual practice of measurements in the environment and examination of dose for the population depends upon the possibility for performing nuclide specific measurements in all environment compartiments, the level of the dose resulting from the contamination of the environment and the related accurateness of the measurements

  20. SIMULATION OF DRIVER’S LOCOMOTIVE-HANDLING ACTIVITY USING THE THEORY OF FUZZY GRAPHS

    Directory of Open Access Journals (Sweden)

    T. V. Butko

    2015-03-01

    Full Text Available Purpose. The efficiency and safety of locomotive control improving is important and relevant scientific and practical problem. Every driver during the trains-handling bases on his experience and knowledge, that is why the compilation and detection the most efficient ways to control the locomotive-handling is one of the stages of measures development to reduce transportation costs. The purpose of this paper is a formalization process description of locomotive-handling and quality parameters determination of this process. Methodology. In order to achieve this goal the theory of fuzzy probabilistic graphs was used. Vertices of the graph correspond to the events start and end operations at train-handling. The graph arcs describe operations on train-handling. Graph consists of thirteen peaks corresponding to the main control actions of the engine-driver. The weighting factors of transitions between vertices are assigned by fuzzy numbers. Their values were obtained by expert estimates. Fuzzy probabilities and transition time are presented as numbers with trapezoidal membership function. Findings. Using successive merging of parallel arcs, loops and vertices elimination, the equivalent fuzzy graph of train-handling and the corresponding L-matrix were obtained. Equivalent graph takes into account separately activity of the driver during normal operation and during emergency situations. Originality. The theoretical foundations of describing process formalization in driver’s locomotive-handling activity were developed using the fuzzy probabilistic graph. The parameters characterizing the decision-making process of engineer were obtained. Practical value. With the resulting model it is possible to estimate the available reserves for the quality improvement of locomotive-handling. Reduction in the time for decision-making will lead to the approximation the current mode of control to the rational one and decrease costs of hauling operations. And reduction

  1. Osteoporosis: Peak Bone Mass in Women

    Science.gov (United States)

    ... bone density are seen even during childhood and adolescence. Hormonal factors. The hormone estrogen has an effect on peak bone mass. For example, women who had their first menstrual cycle at an early age and those who use oral contraceptives, which contain estrogen, often have high bone mineral ...

  2. Facility Location with Double-peaked Preferences

    DEFF Research Database (Denmark)

    Filos-Ratsikas, Aris; Li, Minming; Zhang, Jie

    2015-01-01

    ; this makes the problem essentially more challenging. As our main contribution, we present a simple truthful-in-expectation mechanism that achieves an approximation ratio of 1+b=c for both the social and the maximum, cost, where b is the distance of the agent from the peak and c is the minimum cost...

  3. Robust Peak Recognition in Intracranial Pressure Signals

    Directory of Open Access Journals (Sweden)

    Bergsneider Marvin

    2010-10-01

    Full Text Available Abstract Background The waveform morphology of intracranial pressure pulses (ICP is an essential indicator for monitoring, and forecasting critical intracranial and cerebrovascular pathophysiological variations. While current ICP pulse analysis frameworks offer satisfying results on most of the pulses, we observed that the performance of several of them deteriorates significantly on abnormal, or simply more challenging pulses. Methods This paper provides two contributions to this problem. First, it introduces MOCAIP++, a generic ICP pulse processing framework that generalizes MOCAIP (Morphological Clustering and Analysis of ICP Pulse. Its strength is to integrate several peak recognition methods to describe ICP morphology, and to exploit different ICP features to improve peak recognition. Second, it investigates the effect of incorporating, automatically identified, challenging pulses into the training set of peak recognition models. Results Experiments on a large dataset of ICP signals, as well as on a representative collection of sampled challenging ICP pulses, demonstrate that both contributions are complementary and significantly improve peak recognition performance in clinical conditions. Conclusion The proposed framework allows to extract more reliable statistics about the ICP waveform morphology on challenging pulses to investigate the predictive power of these pulses on the condition of the patient.

  4. Liquid waste processing at Comanche Peak

    International Nuclear Information System (INIS)

    Hughes-Edwards, L.M.; Edwards, J.M.

    1996-01-01

    This article describes the radioactive waste processing at Comanche Peak Steam Electric Station. Topics covered are the following: Reduction of liquid radioactive discharges (system leakage, outage planning); reduction of waste resin generation (waste stream segregation, processing methodology); reduction of activity released and off-site dose. 8 figs., 2 tabs

  5. Avoiding the False Peaks in Correlation Discrimination

    International Nuclear Information System (INIS)

    Awwal, A.S.

    2009-01-01

    Fiducials imprinted on laser beams are used to perform video image based alignment of the 192 laser beams in the National Ignition Facility (NIF) of Lawrence Livermore National Laboratory. In many video images, matched filtering is used to detect the location of these fiducials. Generally, the highest correlation peak is used to determine the position of the fiducials. However, when the signal to-be-detected is very weak compared to the noise, this approach totally breaks down. The highest peaks act as traps for false detection. The active target images used for automatic alignment in the National Ignition Facility are examples of such images. In these images, the fiducials of interest exhibit extremely low intensity and contrast, surrounded by high intensity reflection from metallic objects. Consequently, the highest correlation peaks are caused by these bright objects. In this work, we show how the shape of the correlation is exploited to isolate the valid matches from hundreds of invalid correlation peaks, and therefore identify extremely faint fiducials under very challenging imaging conditions

  6. Hubbert's Peak: the Impending World oil Shortage

    Science.gov (United States)

    Deffeyes, K. S.

    2004-12-01

    Global oil production will probably reach a peak sometime during this decade. After the peak, the world's production of crude oil will fall, never to rise again. The world will not run out of energy, but developing alternative energy sources on a large scale will take at least 10 years. The slowdown in oil production may already be beginning; the current price fluctuations for crude oil and natural gas may be the preamble to a major crisis. In 1956, the geologist M. King Hubbert predicted that U.S. oil production would peak in the early 1970s.1 Almost everyone, inside and outside the oil industry, rejected Hubbert's analysis. The controversy raged until 1970, when the U.S. production of crude oil started to fall. Hubbert was right. Around 1995, several analysts began applying Hubbert's method to world oil production, and most of them estimate that the peak year for world oil will be between 2004 and 2008. These analyses were reported in some of the most widely circulated sources: Nature, Science, and Scientific American.2 None of our political leaders seem to be paying attention. If the predictions are correct, there will be enormous effects on the world economy. Even the poorest nations need fuel to run irrigation pumps. The industrialized nations will be bidding against one another for the dwindling oil supply. The good news is that we will put less carbon dioxide into the atmosphere. The bad news is that my pickup truck has a 25-gallon tank.

  7. Power Peaking Effect of OTTO Fuel Scheme Pebble Bed Reactor

    Science.gov (United States)

    Setiadipura, T.; Suwoto; Zuhair; Bakhri, S.; Sunaryo, G. R.

    2018-02-01

    Pebble Bed Reactor (PBR) type of Hight Temperature Gas-cooled Reactor (HTGR) is a very interesting nuclear reactor design to fulfill the growing electricity and heat demand with a superior passive safety features. Effort to introduce the PBR design to the market can be strengthen by simplifying its system with the Once-through-then-out (OTTO) cycle PBR in which the pebble fuel only pass the core once. Important challenge in the OTTO fuel scheme is the power peaking effect which limit the maximum nominal power or burnup of the design. Parametric survey is perform in this study to investigate the contribution of different design parameters to power peaking effect of OTTO cycle PBR. PEBBED code is utilized in this study to perform the equilibrium PBR core analysis for different design parameter and fuel scheme. The parameters include its core diameter, height-per-diameter (H/D), power density, and core nominal power. Results of this study show that diameter and H/D effectsare stronger compare to the power density and nominal core power. Results of this study might become an importance guidance for design optimization of OTTO fuel scheme PBR.

  8. Effective Teaching Practices in Handling Non Readers

    Directory of Open Access Journals (Sweden)

    Jacklyn S. Dacalos

    2016-08-01

    Full Text Available The study determined the effective teaching practices in handling nonreaders. This seeks to answer the following objectives: describe the adjustments, effective strategies, and scaffolds utilized by teachers in handling nonreaders; differentiate the teachers’ reading adjustments, strategies and scaffolds in teaching nonreaders; analyze the teaching reading efficiency of nonreaders using effective teaching reading strategies; and find significant correlation of nonreaders’ grades and reading teachers’ reading adjustments, strategies and scaffolds. This study utilized mixed methods of research. Case studies of five public schools teachers were selected as primary subjects, who were interviewed in handling nonreaders in the areas of adjustments, strategies, and reading scaffolds. Actual teaching observation was conducted according to the five subjects’ most convenient time. In ascertaining the nonreaders’ academic performance, the students’ grades in English subject was analyzed using T-Test within subject design. Handling nonreaders in order to read and understand better in the lesson is an arduous act, yet; once done with effectiveness and passion, it yielded a great amount of learning success. Effective teaching practices in handling nonreaders comprised the use of teachers’ adjustments, strategies, and scaffolds to establish reading mastery, exposing them to letter sounds, short stories, and the use of follow-up. WH questions enhanced their reading performance significantly. Variations of reading teachers’ nature as: an enabler, a facilitator, a humanist, a behaviorist, and an expert, as regards to their teaching practices, were proven significant to students’ reading effectiveness.

  9. Smart Demand Response Based on Smart Homes

    Directory of Open Access Journals (Sweden)

    Jingang Lai

    2015-01-01

    Full Text Available Smart homes (SHs are crucial parts for demand response management (DRM of smart grid (SG. The aim of SHs based demand response (DR is to provide a flexible two-way energy feedback whilst (or shortly after the consumption occurs. It can potentially persuade end-users to achieve energy saving and cooperate with the electricity producer or supplier to maintain balance between the electricity supply and demand through the method of peak shaving and valley filling. However, existing solutions are challenged by the lack of consideration between the wide application of fiber power cable to the home (FPCTTH and related users’ behaviors. Based on the new network infrastructure, the design and development of smart DR systems based on SHs are related with not only functionalities as security, convenience, and comfort, but also energy savings. A new multirouting protocol based on Kruskal’s algorithm is designed for the reliability and safety of the SHs distribution network. The benefits of FPCTTH-based SHs are summarized at the end of the paper.

  10. A critical review of IEA's oil demand forecast for China

    International Nuclear Information System (INIS)

    Nel, Willem P.; Cooper, Christopher J.

    2008-01-01

    China has a rapidly growing economy with a rapidly increasing demand for oil. The International Energy Agency (IEA) investigated possible future oil demand scenarios for China in the 2006 World Energy Outlook. The debate on whether oil supplies will be constrained in the near future, because of limited new discoveries, raises the concern that the oil industry may not be able to produce sufficient oil to meet this demand. This paper examines the historical relationship between economic growth and oil consumption in a number of countries. Logistic curve characteristics are observed in the relationship between per capita economic activity and oil consumption. This research has determined that the minimum statistical (lower-bound) annual oil consumption for developed countries is 11 barrels per capita. Despite the increase reported in total energy efficiency, no developed country has been able to reduce oil consumption below this lower limit. Indeed, the IEA projections to 2030 for the OECD countries show no reduction in oil demand on a per capita basis. If this lower limit is applied to China, it is clear that the IEA projections for China are under-estimating the growth in demand for oil. This research has determined that this under-estimation could be as high as 10 million barrels per day by 2025. If proponents of Peak Oil such as Laherrere, Campbell and Deffeyes are correct about the predicted peak in oil production before 2020 then the implications of this reassessment of China's oil demand will have profound implications for mankind

  11. Load Reduction, Demand Response and Energy Efficient Technologies and Strategies

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, Paul A.; Parker, Graham B.; Hatley, Darrel D.

    2008-11-19

    The Department of Energy’s (DOE’s) Pacific Northwest National Laboratory (PNNL) was tasked by the DOE Office of Electricity (OE) to recommend load reduction and grid integration strategies, and identify additional demand response (energy efficiency/conservation opportunities) and strategies at the Forest City Housing (FCH) redevelopment at Pearl Harbor and the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay. The goal was to provide FCH staff a path forward to manage their electricity load and thus reduce costs at these FCH family housing developments. The initial focus of the work was at the MCBH given the MCBH has a demand-ratchet tariff, relatively high demand (~18 MW) and a commensurate high blended electricity rate (26 cents/kWh). The peak demand for MCBH occurs in July-August. And, on average, family housing at MCBH contributes ~36% to the MCBH total energy consumption. Thus, a significant load reduction in family housing can have a considerable impact on the overall site load. Based on a site visit to the MCBH and meetings with MCBH installation, FCH, and Hawaiian Electric Company (HECO) staff, recommended actions (including a "smart grid" recommendation) that can be undertaken by FCH to manage and reduce peak-demand in family housing are made. Recommendations are also made to reduce overall energy consumption, and thus reduce demand in FCH family housing.

  12. Measuring the financial impact of demand response for electricity retailers

    International Nuclear Information System (INIS)

    Feuerriegel, Stefan; Neumann, Dirk

    2014-01-01

    Due to the integration of intermittent resources of power generation such as wind and solar, the amount of supplied electricity will exhibit unprecedented fluctuations. Electricity retailers can partially meet the challenge of matching demand and volatile supply by shifting power demand according to the fluctuating supply side. The necessary technology infrastructure such as Advanced Metering Infrastructures for this so-called Demand Response (DR) has advanced. However, little is known about the economic dimension and further effort is strongly needed to realistically quantify the financial impact. To succeed in this goal, we derive an optimization problem that minimizes procurement costs of an electricity retailer in order to control Demand Response usage. The evaluation with historic data shows that cost volatility can be reduced by 7.74%; peak costs drop by 14.35%; and expenditures of retailers can be significantly decreased by 3.52%. - Highlights: • Ex post simulation to quantify financial impacts of demand response. • Effects of Demand Response are simulated based on real-world data. • Procurement costs of an average electricity retailer decrease by 3.4%. • Retailers can cut hourly peak expenditures by 12.1%. • Cost volatility is reduced by 12.2%

  13. Implications of Peak Oil for Industrialized Societies

    Science.gov (United States)

    McPherson, Guy R.; Weltzin, Jake F.

    2008-01-01

    The world passed the halfway point of oil supply in 2005. World demand for oil likely will severely outstrip supply in 2008, leading to increasingly higher oil prices. Consequences are likely to include increasing gasoline prices, rapidly increasing inflation, and subsequently a series of increasingly severe recessions followed by a worldwide…

  14. Prediction of peak overlap in NMR spectra

    International Nuclear Information System (INIS)

    Hefke, Frederik; Schmucki, Roland; Güntert, Peter

    2013-01-01

    Peak overlap is one of the major factors complicating the analysis of biomolecular NMR spectra. We present a general method for predicting the extent of peak overlap in multidimensional NMR spectra and its validation using both, experimental data sets and Monte Carlo simulation. The method is based on knowledge of the magnetization transfer pathways of the NMR experiments and chemical shift statistics from the Biological Magnetic Resonance Data Bank. Assuming a normal distribution with characteristic mean value and standard deviation for the chemical shift of each observable atom, an analytic expression was derived for the expected overlap probability of the cross peaks. The analytical approach was verified to agree with the average peak overlap in a large number of individual peak lists simulated using the same chemical shift statistics. The method was applied to eight proteins, including an intrinsically disordered one, for which the prediction results could be compared with the actual overlap based on the experimentally measured chemical shifts. The extent of overlap predicted using only statistical chemical shift information was in good agreement with the overlap that was observed when the measured shifts were used in the virtual spectrum, except for the intrinsically disordered protein. Since the spectral complexity of a protein NMR spectrum is a crucial factor for protein structure determination, analytical overlap prediction can be used to identify potentially difficult proteins before conducting NMR experiments. Overlap predictions can be tailored to particular classes of proteins by preparing statistics from corresponding protein databases. The method is also suitable for optimizing recording parameters and labeling schemes for NMR experiments and improving the reliability of automated spectra analysis and protein structure determination.

  15. The peak in anomalous magnetic viscosity

    International Nuclear Information System (INIS)

    Collocott, S.J.; Watterson, P.A.; Tan, X.H.; Xu, H.

    2014-01-01

    Anomalous magnetic viscosity, where the magnetization as a function of time exhibits non-monotonic behaviour, being seen to increase, reach a peak, and then decrease, is observed on recoil lines in bulk amorphous ferromagnets, for certain magnetic prehistories. A simple geometrical approach based on the motion of the state line on the Preisach plane gives a theoretical framework for interpreting non-monotonic behaviour and explains the origin of the peak. This approach gives an expression for the time taken to reach the peak as a function of the applied (or holding) field. The theory is applied to experimental data for bulk amorphous ferromagnet alloys of composition Nd 60−x Fe 30 Al 10 Dy x , x = 0, 1, 2, 3 and 4, and it gives a reasonable description of the observed behaviour. The role played by other key magnetic parameters, such as the intrinsic coercivity and fluctuation field, is also discussed. When the non-monotonic behaviour of the magnetization of a number of alloys is viewed in the context of the model, features of universal behaviour emerge, that are independent of alloy composition. - Highlights: • Development of a simple geometrical model based on the Preisach model which gives a complete explanation of the peak in the magnetic viscosity. • Geometrical approach is extended by considering equations that govern the motion of the state line. • The model is used to deduce the relationship between the holding field and the time it takes to reach the peak. • The model is tested with experimental results for a range of Nd–Fe–Al–Dy bulk amorphous ferromagnets. • There is good agreement between the model and the experimental data

  16. The spatial resolution of epidemic peaks.

    Directory of Open Access Journals (Sweden)

    Harriet L Mills

    2014-04-01

    Full Text Available The emergence of novel respiratory pathogens can challenge the capacity of key health care resources, such as intensive care units, that are constrained to serve only specific geographical populations. An ability to predict the magnitude and timing of peak incidence at the scale of a single large population would help to accurately assess the value of interventions designed to reduce that peak. However, current disease-dynamic theory does not provide a clear understanding of the relationship between: epidemic trajectories at the scale of interest (e.g. city; population mobility; and higher resolution spatial effects (e.g. transmission within small neighbourhoods. Here, we used a spatially-explicit stochastic meta-population model of arbitrary spatial resolution to determine the effect of resolution on model-derived epidemic trajectories. We simulated an influenza-like pathogen spreading across theoretical and actual population densities and varied our assumptions about mobility using Latin-Hypercube sampling. Even though, by design, cumulative attack rates were the same for all resolutions and mobilities, peak incidences were different. Clear thresholds existed for all tested populations, such that models with resolutions lower than the threshold substantially overestimated population-wide peak incidence. The effect of resolution was most important in populations which were of lower density and lower mobility. With the expectation of accurate spatial incidence datasets in the near future, our objective was to provide a framework for how to use these data correctly in a spatial meta-population model. Our results suggest that there is a fundamental spatial resolution for any pathogen-population pair. If underlying interactions between pathogens and spatially heterogeneous populations are represented at this resolution or higher, accurate predictions of peak incidence for city-scale epidemics are feasible.

  17. Detection and quantitative characterization of artificial extra peaks following polymerase chain reaction amplification of 14 short tandem repeat systems used in forensic investigations

    DEFF Research Database (Denmark)

    Meldgaard, Michael; Morling, N

    1997-01-01

    Detection on automated DNA sequencers of polymerase chain reaction (PCR) products of tetra- and penta-nucleotide short tandem repeat (STR) loci frequently reveals one or more extra peaks along with the true, major allele peak. The most frequent extra peak pattern is a single smaller peak which...... is one repeat unit shorter than the true allele peak. The existence of such artificial peaks is of special importance when the methods are used for forensic investigations because the artificial extra peaks may simulate true alleles when samples containing mixtures of DNA from different individuals...... are analyzed. We have investigated the relative levels of formation of extra peaks in 14 STR marker systems. We found that not only the parameters of the PCR but also factors determining the stringency during the post-PCR and pre-electrophoresis handling of samples were of importance for the formation of extra...

  18. Modelling Commodity Demands and Labour Supply with m-Demands

    OpenAIRE

    Browning, Martin

    1999-01-01

    In the empirical modelling of demands and labour supply we often lack data on a full set of goods. The usual response is to invoke separability assumptions. Here we present an alternative based on modelling demands as a function of prices and the quantity of a reference good rather than total expenditure. We term such demands m-demands. The advantage of this approach is that we make maximum use of the data to hand without invoking implausible separability assumptions. In the theory section qu...

  19. Fuel switching in Harare: An almost ideal demand system approach

    International Nuclear Information System (INIS)

    Chambwera, Muyeye; Folmer, Henk

    2007-01-01

    In urban areas several energy choices are available and the amount of (a given type of) fuel consumed is based on complex household decision processes. This paper analyzes urban fuel (particularly firewood) demand in an energy mix context by means of an Almost Ideal Demand System based on a survey carried out among 500 households in Harare in 2003. Using a multi-stage budgeting approach, the model estimates the share of energy in total household expenditure and the shares of firewood, electricity and kerosene in total energy expenditure. Using the model results simulations show that the main policy handles to reduce the demand for firewood and to mitigate environmental degradation such as deforestation include decreasing prices of alternative fuels, notably kerosene. Moreover, in the long run sound economic policy will positively impact on the energy budget whereas education and the degree of electrification will contribute to a reduction of the use of firewood

  20. Development of tritium-handling technique

    International Nuclear Information System (INIS)

    Ohmura, Hiroshi; Hosaka, Akio; Okamoto, Takahumi

    1988-01-01

    The overview of developing activities for tritium-handling techniques in IHI are presented. To establish a fusion power plant, tritium handling is one of the key technologies. Recently in JAERI, conceptual design of FER (Fusion Experimental Reactor) has been carried out, and the FER system requires a processing system for a large amount of tritium. IHI concentrate on investigation of fuel gas purification, isotope separation and storage systems under contract with Toshiba Corporation. Design results of the systems and each components are reviewed. IHI has been developing fundamental handling techniques which are the ZrNi bed for hydrogen isotope storage and isotope separation by laser. The ZrNi bed with a tritium storage capacity of 1000 Ci has been constructed and recovery capability of the hydrogen isotope until 10 -4 Torr {0.013 Pa} was confirmed. In laser isotope separation, the optimum laser wave length has been determined. (author)

  1. Automated system for handling tritiated mixed waste

    International Nuclear Information System (INIS)

    Dennison, D.K.; Merrill, R.D.; Reitz, T.C.

    1995-03-01

    Lawrence Livermore National Laboratory (LLNL) is developing a semi system for handling, characterizing, processing, sorting, and repackaging hazardous wastes containing tritium. The system combines an IBM-developed gantry robot with a special glove box enclosure designed to protect operators and minimize the potential release of tritium to the atmosphere. All hazardous waste handling and processing will be performed remotely, using the robot in a teleoperational mode for one-of-a-kind functions and in an autonomous mode for repetitive operations. Initially, this system will be used in conjunction with a portable gas system designed to capture any gaseous-phase tritium released into the glove box. This paper presents the objectives of this development program, provides background related to LLNL's robotics and waste handling program, describes the major system components, outlines system operation, and discusses current status and plans

  2. DOE handbook: Tritium handling and safe storage

    International Nuclear Information System (INIS)

    1999-03-01

    The DOE Handbook was developed as an educational supplement and reference for operations and maintenance personnel. Most of the tritium publications are written from a radiological protection perspective. This handbook provides more extensive guidance and advice on the null range of tritium operations. This handbook can be used by personnel involved in the full range of tritium handling from receipt to ultimate disposal. Compliance issues are addressed at each stage of handling. This handbook can also be used as a reference for those individuals involved in real time determination of bounding doses resulting from inadvertent tritium releases. This handbook provides useful information for establishing processes and procedures for the receipt, storage, assay, handling, packaging, and shipping of tritium and tritiated wastes. It includes discussions and advice on compliance-based issues and adds insight to those areas that currently possess unclear DOE guidance

  3. DOE handbook: Tritium handling and safe storage

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The DOE Handbook was developed as an educational supplement and reference for operations and maintenance personnel. Most of the tritium publications are written from a radiological protection perspective. This handbook provides more extensive guidance and advice on the null range of tritium operations. This handbook can be used by personnel involved in the full range of tritium handling from receipt to ultimate disposal. Compliance issues are addressed at each stage of handling. This handbook can also be used as a reference for those individuals involved in real time determination of bounding doses resulting from inadvertent tritium releases. This handbook provides useful information for establishing processes and procedures for the receipt, storage, assay, handling, packaging, and shipping of tritium and tritiated wastes. It includes discussions and advice on compliance-based issues and adds insight to those areas that currently possess unclear DOE guidance.

  4. MHSS: a material handling system simulator

    Energy Technology Data Exchange (ETDEWEB)

    Pomernacki, L.; Hollstien, R.B.

    1976-04-07

    A Material Handling System Simulator (MHSS) program is described that provides specialized functional blocks for modeling and simulation of nuclear material handling systems. Models of nuclear fuel fabrication plants may be built using functional blocks that simulate material receiving, storage, transport, inventory, processing, and shipping operations as well as the control and reporting tasks of operators or on-line computers. Blocks are also provided that allow the user to observe and gather statistical information on the dynamic behavior of simulated plants over single or replicated runs. Although it is currently being developed for the nuclear materials handling application, MHSS can be adapted to other industries in which material accountability is important. In this paper, emphasis is on the simulation methodology of the MHSS program with application to the nuclear material safeguards problem. (auth)

  5. Fuel handling grapple for nuclear reactor plants

    International Nuclear Information System (INIS)

    Rousar, D.L.

    1992-01-01

    This patent describes a fuel handling system for nuclear reactor plants. It comprises: a reactor vessel having an openable top and removable cover and containing therein, submerged in water substantially filling the reactor vessel, a fuel core including a multiplicity of fuel bundles formed of groups of sealed tube elements enclosing fissionable fuel assembled into units, the fuel handling system consisting essentially of the combination of: a fuel bundle handling platform movable over the open top of the reactor vessel; a fuel bundle handling mast extendable downward from the platform with a lower end projecting into the open top reactor vessel to the fuel core submerged in water; a grapple head mounted on the lower end of the mast provided with grapple means comprising complementary hooks which pivot inward toward each other to securely grasp a bail handle of a nuclear reactor fuel bundle and pivot backward away from each other to release a bail handle; the grapple means having a hollow cylindrical support shaft fixed within the grapple head with hollow cylindrical sleeves rotatably mounted and fixed in longitudinal axial position on the support shaft and each sleeve having complementary hooks secured thereto whereby each hook pivots with the rotation of the sleeve secured thereto; and the hollow cylindrical support shaft being provided with complementary orifices on opposite sides of its hollow cylindrical and intermediate to the sleeves mounted thereon whereby the orifices on both sides of the hollow cylindrical support shaft are vertically aligned providing a direct in-line optical viewing path downward there-through and a remote operator positioned above the grapple means can observe from overhead the area immediately below the grapple hooks

  6. Handling of biological specimens for electron microscopy

    International Nuclear Information System (INIS)

    Bullock, G.

    1987-01-01

    There are many different aspects of specimen preparation procedure which need to be considered in order to achieve good results. Whether using the scanning or transmission microscope, the initial handling procedures are very similar and are selected for the information required. Handling procedures and techniques described are: structural preservation; immuno-and histo-chemistry; x-ray microanalysis and autoradiography; dehydration and embedding; mounting and coating specimens for scanning electron microscopy; and sectioning of resin embedded material. With attention to detail and careful choice of the best available technique, excellent results should be obtainable whatever the specimen. 6 refs

  7. Human factors issues in fuel handling

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, J D; Iwasa-Madge, K M; Tucker, D A [Humansystems Inc., Milton, ON (Canada)

    1994-12-31

    The staff of the Atomic Energy Control Board wish to further their understanding of human factors issues of potential concern associated with fuel handling in CANDU nuclear power stations. This study contributes to that objective by analysing the role of human performance in the overall fuel handling process at Ontario Hydro`s Darlington Nuclear Generating Station, and reporting findings in several areas. A number of issues are identified in the areas of design, operating and maintenance practices, and the organizational and management environment. 1 fig., 4 tabs., 19 refs.

  8. Safe handling of plutonium: a panel report

    Energy Technology Data Exchange (ETDEWEB)

    1974-01-01

    This guide results from a meeting of a Panel of Experts held by the International Atomic Energy Agency on 8 to 12 November 1971. It is directed to workers in research laboratories handling plutonium in gram amounts. Contents: aspects of the physical and chemical properties of plutonium; metabolic features of plutonium; facility design features for safe handling of plutonium (layout of facility, working zones, decontamination room, etc.); glove boxes; health surveillance (surveillance of environment and supervision of workers); emergencies; organization. Annexes: types of glove boxes; tables; mobile ..cap alpha.. air sampler; aerosol monitor; bio-assay limits of detection; examples of contamination control monitors.

  9. Apparatus for handling control rod drives

    International Nuclear Information System (INIS)

    Akimoto, A.; Watanabe, M.; Yoshida, T.; Sugaya, Z.; Saito, T.; Ishii, Y.

    1979-01-01

    An apparatus for handling control rod drives (CRD's) attached by detachable fixing means to housings mounted in a reactor pressure vessel and each coupled to one of control rods inserted in the reactor pressure vessel is described. The apparatus for handling the CRD's comprise cylindrical housing means, uncoupling means mounted in the housing means for uncoupling each of the control rods from the respective CRD, means mounted on the housing means for effecting attaching and detaching of the fixing means, means for supporting the housing means, and means for moving the support means longitudinally of the CRD

  10. Control panel handling of a nuclear simulator

    International Nuclear Information System (INIS)

    Martin Polo, F.; Jimenez Fraustro, L.A.; Banuelos Galindo, A.; Diamant Rubinstein, A.

    1985-01-01

    The handling of the control panels for a Nuclear Simulator for operating training is described. The control panels are handled by a set of intelligent controllers, each with at least two processors (8035 - Communications Controller and a 8085 - Master processor). The Controllers are connected to the main computers (Two dual processor Gould concept 32/6780 and a single processor Gould concept 32/6705) via serial asynchronous channels in a multidrop, star-like architecture. The controllers transmit to the main computers only the changes detected and receive the whole set of output variables as computed by the mathematical models of the Nuclear Plant

  11. Blocking-out auditory distracters while driving : A cognitive strategy to reduce task-demands on the road

    NARCIS (Netherlands)

    Unal, Ayca Berfu; Platteel, Samantha; Steg, Linda; Epstude, Kai

    The current research examined how drivers handle task-demands induced by listening to the radio while driving. In particular, we explored the traces of a possible cognitive strategy that might be used by drivers to cope with task-demands, namely blocking-out auditory distracters. In Study 1 (N =

  12. Smart households: Dispatch strategies and economic analysis of distributed energy storage for residential peak shaving

    International Nuclear Information System (INIS)

    Zheng, Menglian; Meinrenken, Christoph J.; Lackner, Klaus S.

    2015-01-01

    Highlights: • Cost-effectiveness of building-based storage for peak shaving has hitherto not been well understood. • Several existing storage technologies are shown to provide cost-effective peak shaving. • Setting grid demand targets rather than hard demand limits improves economics. • Accounting for seasonal demand variations in storage dispatch strategy improves economics further. • Total-energy-throughput approach is used to determine storage lifetimes. - Abstract: Meeting time-varying peak demand poses a key challenge to the U.S. electricity system. Building-based electricity storage – to enable demand response (DR) without curtailing actual appliance usage – offers potential benefits of lower electricity production cost, higher grid reliability, and more flexibility to integrate renewables. DR tariffs are currently available in the U.S. but building-based storage is still underutilized due to insufficiently understood cost-effectiveness and dispatch strategies. Whether DR schemes can yield a profit for building operators (i.e., reduction in electricity bill that exceeds levelized storage cost) and which particular storage technology yields the highest profit is yet to be answered. This study aims to evaluate the economics of providing peak shaving DR under a realistic tariff (Con Edison, New York), using a range of storage technologies (conventional and advanced batteries, flywheel, magnetic storage, pumped hydro, compressed air, and capacitors). An agent-based stochastic model is used to randomly generate appliance-level demand profiles for an average U.S. household. We first introduce a levelized storage cost model which is based on a total-energy-throughput lifetime. We then develop a storage dispatch strategy which optimizes the storage capacity and the demand limit on the grid. We find that (i) several storage technologies provide profitable DR; (ii) annual profit from such DR can range from 1% to 39% of the household’s non-DR electricity

  13. Global energy demand outlook

    International Nuclear Information System (INIS)

    Hatcher, S.R.

    1999-01-01

    Perhaps the most compelling issue the world will face in the next century is the quality of life of the increasing populations of the poorer regions of the world. Energy is the key to generating wealth and protecting the environment. Today, most of the energy generated comes from fossil fuels and there should be enough for an increase in consumption over the next half century. However, this is likely to be impacted by the Kyoto Protocol on carbon dioxide emissions. Various authoritative studies lead to a global energy demand projection of between 850 to 1070 EJ per year in the mid-21 st century, which is nearly three times as much as the world uses today. The studies further indicate that, unless there is a major thrust by governments to create incentives and/or to levy heavy taxes, the use of fossil fuels will continue to increase and there will be a major increase in carbon dioxide emissions globally. Most of the increase will come from the newly industrializing countries which do not have the technology or financial resources to install non-carbon energy sources such as nuclear power, and the new renewable energy technologies. The real issue for the nuclear industry is investment cost. Developing countries, in particular will have difficulty in raising capital for energy projects with a high installed cost and will have difficulties in raising large blocks of capital. A reduction in investment costs of the order of 50% with a short construction schedule is in order if nuclear power is to compete and contribute significantly to energy supply and the reduction of carbon dioxide emissions. Current nuclear power plants and methods are simply not suited to the production of plants that will compete in this situation. Mass production designs are needed to get the benefits of cost reduction. Water cooled reactors are well demonstrated and positioned to achieve the cost reduction necessary but only via some radical thinking on the part of the designers. The reactors of

  14. Promotion and Fast Food Demand

    OpenAIRE

    Timothy J. Richards; Luis Padilla

    2009-01-01

    Many believe that fast food promotion is a significant cause of the obesity epidemic in North America. Industry members argue that promotion only reallocates brand shares and does not increase overall demand. We study the effect of fast food promotion on market share and total demand by estimating a discrete / continuous model of fast food restaurant choice and food expenditure that explicitly accounts for both spatial and temporal determinants of demand. Estimates are obtained using a unique...

  15. Intercity Travel Demand Analysis Model

    OpenAIRE

    Ming Lu; Hai Zhu; Xia Luo; Lei Lei

    2014-01-01

    It is well known that intercity travel is an important component of travel demand which belongs to short distance corridor travel. The conventional four-step method is no longer suitable for short distance corridor travel demand analysis for the time spent on urban traffic has a great impact on traveler's main mode choice. To solve this problem, the author studied the existing intercity travel demand analysis model, then improved it based on the study, and finally established a combined model...

  16. Job demands-resources model

    OpenAIRE

    Bakker, Arnold; Demerouti, Eva

    2013-01-01

    markdownabstract* The question of what causes job stress and what motivates people has received a lot of research attention during the past five decades. In this paper, we discuss Job Demands-Resources (JD-R) theory, which represents an extension of the Job Demands-Resources model (Bakker & Demerouti, 2007; Demerouti, Bakker, Nachreiner, & Schaufeli, 2001) and is inspired by job design and job stress theories. JD-R theory explains how job demands and resources have unique and multiplicative e...

  17. Nuclear liability claims handling and costs - Germany and some comparative solutions

    International Nuclear Information System (INIS)

    Harbruecker, D.

    2000-01-01

    Comparison of legal status in Central Europe: coverage by insurance and State intervention, coverage of legal expenses and interests on awards technical problems of claims handing after a nuclear incident: guidelines to be prepared by insurer before and not after an incident occurred, demands on provider of financial security claims handling for part guaranteed by State to be transferred to insurer, necessary regulations of such arrangements (author)

  18. Stereotactic Bragg peak proton radiosurgery method

    International Nuclear Information System (INIS)

    Kjellberg, R.N.

    1979-01-01

    A brief description of the technical aspects of a stereotactic Bragg peak proton radiosurgical method for the head is presented. The preparatory radiographic studies are outlined and the stereotactic instrument and positioning of the patient are described. The instrument is so calibrated that after corrections for soft tissue and bone thickness, the Bragg peak superimposes upon the intracranial target. The head is rotated at specific intervals to allow predetermined portals of access for the beam path, all of which converge on the intracranial target. Normally, portals are arranged to oppose and overlap from both sides of the head. Using a number of beams (in sequence) on both sides of the head, the target dose is far greater than the path dose. The procedure normally takes 3/2-2 hours, following which the patient can walk away. (Auth./C.F.)

  19. Central peaking of magnetized gas discharges

    International Nuclear Information System (INIS)

    Chen, Francis F.; Curreli, Davide

    2013-01-01

    Partially ionized gas discharges used in industry are often driven by radiofrequency (rf) power applied at the periphery of a cylinder. It is found that the plasma density n is usually flat or peaked on axis even if the skin depth of the rf field is thin compared with the chamber radius a. Previous attempts at explaining this did not account for the finite length of the discharge and the boundary conditions at the endplates. A simple 1D model is used to focus on the basic mechanism: the short-circuit effect. It is found that a strong electric field (E-field) scaled to electron temperature T e , drives the ions inward. The resulting density profile is peaked on axis and has a shape independent of pressure or discharge radius. This “universal” profile is not affected by a dc magnetic field (B-field) as long as the ion Larmor radius is larger than a

  20. Peak Oil, Food Systems, and Public Health

    Science.gov (United States)

    Parker, Cindy L.; Kirschenmann, Frederick L.; Tinch, Jennifer; Lawrence, Robert S.

    2011-01-01

    Peak oil is the phenomenon whereby global oil supplies will peak, then decline, with extraction growing increasingly costly. Today's globalized industrial food system depends on oil for fueling farm machinery, producing pesticides, and transporting goods. Biofuels production links oil prices to food prices. We examined food system vulnerability to rising oil prices and the public health consequences. In the short term, high food prices harm food security and equity. Over time, high prices will force the entire food system to adapt. Strong preparation and advance investment may mitigate the extent of dislocation and hunger. Certain social and policy changes could smooth adaptation; public health has an essential role in promoting a proactive, smart, and equitable transition that increases resilience and enables adequate food for all. PMID:21778492

  1. Recommendations for cask features for robotic handling from the Advanced Handling Technology Project

    International Nuclear Information System (INIS)

    Drotning, W.

    1991-02-01

    This report describes the current status and recent progress in the Advanced Handling Technology Project (AHTP) initiated to explore the use of advanced robotic systems and handling technologies to perform automated cask handling operations at radioactive waste handling facilities, and to provide guidance to cask designers on the impact of robotic handling on cask design. Current AHTP tasks have developed system mock-ups to investigate robotic manipulation of impact limiters and cask tiedowns. In addition, cask uprighting and transport, using computer control of a bridge crane and robot, were performed to demonstrate the high speed cask transport operation possible under computer control. All of the current AHTP tasks involving manipulation of impact limiters and tiedowns require robotic operations using a torque wrench. To perform these operations, a pneumatic torque wrench and control system were integrated into the tool suite and control architecture of the gantry robot. The use of captured fasteners is briefly discussed as an area where alternative cask design preferences have resulted from the influence of guidance for robotic handling vs traditional operations experience. Specific robotic handling experiences with these system mock-ups highlight a number of continually recurring design principles: (1) robotic handling feasibility is improved by mechanical designs which emphasize operation with limited dexterity in constrained workspaces; (2) clearances, tolerances, and chamfers must allow for operations under actual conditions with consideration for misalignment and imprecise fixturing; (3) successful robotic handling is enhanced by including design detail in representations for model-based control; (4) robotic handling and overall quality assurance are improved by designs which eliminate the use of loose, disassembled parts. 8 refs., 15 figs

  2. North American oil demand outlook

    International Nuclear Information System (INIS)

    Stewart, M.B.

    1995-01-01

    An understanding of the relationship of economic growth and potential petroleum product demand is needed to forecast the potential for North American oil demand growth as well as knowledge of world supply and price. The bullish expectations for economic growth in the US and Canada auger well for North American refiners and marketeers. The growth in world economic output forecast, however, means a larger oil demand and an increase in OPEC's pricing power. Such price increases could depress North American oil demand growth. (author)

  3. Hanford Site peak gust wind speeds

    International Nuclear Information System (INIS)

    Ramsdell, J.V.

    1998-01-01

    Peak gust wind data collected at the Hanford Site since 1945 are analyzed to estimate maximum wind speeds for use in structural design. The results are compared with design wind speeds proposed for the Hanford Site. These comparisons indicate that design wind speeds contained in a January 1998 advisory changing DOE-STD-1020-94 are excessive for the Hanford Site and that the design wind speeds in effect prior to the changes are still appropriate for the Hanford Site

  4. Commodity hydrogen from off-peak electricity

    Energy Technology Data Exchange (ETDEWEB)

    Darrow, K.; Biederman, N.; Konopka, A.

    1977-01-01

    This paper considers the use of off-peak electrical power as an energy source for the electrolytic production of hydrogen. The present industrial uses for hydrogen are examined to determine if hydrogen produced in this fashion would be competitive with the industry's onsite production or existing hydrogen prices. The paper presents a technical and economic feasibility analysis of the various components required and of the operation of the system as a whole including production, transmission, storage, and markets.

  5. Some practical aspects of peak kilovoltage measurements

    International Nuclear Information System (INIS)

    Irfan, A.Y.; Pugh, V.I.; Jeffery, C.D.

    1985-01-01

    The peak kilovoltage (kVsub(p)) across the X-ray tube electrodes in diagnostic X-ray machines is a most important parameter, affecting both radiation output and beam quality. Four commercially available non-invasive devices used for kVsub(p) measurement were tested using a selection of generator waveforms. The majority of the devices provided satisfactory measurements of the kVsub(p) to within approximately +- kV provided certain operating conditions are observed. (U.K.)

  6. METing SUSY on the Z peak

    Energy Technology Data Exchange (ETDEWEB)

    Barenboim, G.; Bernabeu, J.; Vives, O. [Universitat de Valencia, Departament de Fisica Teorica, Burjassot (Spain); Universitat de Valencia-CSIC, Parc Cientific U.V., IFIC, Paterna (Spain); Mitsou, V.A.; Romero, E. [Universitat de Valencia-CSIC, Parc Cientific U.V., IFIC, Paterna (Spain)

    2016-02-15

    Recently the ATLAS experiment announced a 3 σ excess at the Z-peak consisting of 29 pairs of leptons together with two or more jets, E{sub T}{sup miss} > 225 GeV and HT > 600 GeV, to be compared with 10.6 ± 3.2 expected lepton pairs in the Standard Model. No excess outside the Z-peak was observed. By trying to explain this signal with SUSY we find that only relatively light gluinos, m{sub g} or similar 400 GeV decaying predominantly to Z-boson plus a light gravitino, such that nearly every gluino produces at least one Z-boson in its decay chain, could reproduce the excess. We construct an explicit general gauge mediation model able to reproduce the observed signal overcoming all the experimental limits. Needless to say, more sophisticated models could also reproduce the signal, however, any model would have to exhibit the following features: light gluinos, or heavy particles with a strong production cross section, producing at least one Z-boson in its decay chain. The implications of our findings for the Run II at LHC with the scaling on the Z peak, as well as for the direct search of gluinos and other SUSY particles, are pointed out. (orig.)

  7. Acquisition of peak responding: what is learned?

    Science.gov (United States)

    Balci, Fuat; Gallistel, Charles R; Allen, Brian D; Frank, Krystal M; Gibson, Jacqueline M; Brunner, Daniela

    2009-01-01

    We investigated how the common measures of timing performance behaved in the course of training on the peak procedure in C3H mice. Following fixed interval (FI) pre-training, mice received 16 days of training in the peak procedure. The peak time and spread were derived from the average response rates while the start and stop times and their relative variability were derived from a single-trial analysis. Temporal precision (response spread) appeared to improve in the course of training. This apparent improvement in precision was, however, an averaging artifact; it was mediated by the staggered appearance of timed stops, rather than by the delayed occurrence of start times. Trial-by-trial analysis of the stop times for individual subjects revealed that stops appeared abruptly after three to five sessions and their timing did not change as training was prolonged. Start times and the precision of start and stop times were generally stable throughout training. Our results show that subjects do not gradually learn to time their start or stop of responding. Instead, they learn the duration of the FI, with robust temporal control over the start of the response; the control over the stop of response appears abruptly later.

  8. METing SUSY on the Z peak

    International Nuclear Information System (INIS)

    Barenboim, G.; Bernabeu, J.; Vives, O.; Mitsou, V.A.; Romero, E.

    2016-01-01

    Recently the ATLAS experiment announced a 3 σ excess at the Z-peak consisting of 29 pairs of leptons together with two or more jets, E T miss > 225 GeV and HT > 600 GeV, to be compared with 10.6 ± 3.2 expected lepton pairs in the Standard Model. No excess outside the Z-peak was observed. By trying to explain this signal with SUSY we find that only relatively light gluinos, m g or similar 400 GeV decaying predominantly to Z-boson plus a light gravitino, such that nearly every gluino produces at least one Z-boson in its decay chain, could reproduce the excess. We construct an explicit general gauge mediation model able to reproduce the observed signal overcoming all the experimental limits. Needless to say, more sophisticated models could also reproduce the signal, however, any model would have to exhibit the following features: light gluinos, or heavy particles with a strong production cross section, producing at least one Z-boson in its decay chain. The implications of our findings for the Run II at LHC with the scaling on the Z peak, as well as for the direct search of gluinos and other SUSY particles, are pointed out. (orig.)

  9. Monitoring device for local power peaking coefficients

    International Nuclear Information System (INIS)

    Mihashi, Ishi

    1987-01-01

    Purpose: To determine and monitor the local power peaking coefficients by a method not depending on the combination of fuel types. Constitution: Representative values for the local power distribution can be obtained by determining corresponding burn-up degrees based on the burn-up degree of each of fuel assembly segments obtained in a power distribution monitor and by the interpolation and extrapolation of void coefficients. The typical values are multiplied with compensation coefficients for the control rod effect and coefficients for compensating the effect of adjacent fuel assemblies in a calculation device to obtain typical values for the present local power distribution compensated with all of the effects. Further, the calculation device compares them with typical values of the present local power distribution to obtain an aimed local power peaking coefficient as the maximum value thereof. According to the present invention, since the local power peaking coefficients can be determined not depending on the combination of the kind of fuels, if the combination of fuel assemblies is increased upon fuel change, the amount of operation therefor is not increased. (Kamimura, M.)

  10. Participation through Automation: Fully Automated Critical PeakPricing in Commercial Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Kiliccote,Sila; Linkugel, Eric

    2006-06-20

    California electric utilities have been exploring the use of dynamic critical peak prices (CPP) and other demand response programs to help reduce peaks in customer electric loads. CPP is a tariff design to promote demand response. Levels of automation in DR can be defined as follows: Manual Demand Response involves a potentially labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. They refer to this as Auto-DR. This paper describes the development, testing, and results from automated CPP (Auto-CPP) as part of a utility project in California. The paper presents the project description and test methodology. This is followed by a discussion of Auto-DR strategies used in the field test buildings. They present a sample Auto-CPP load shape case study, and a selection of the Auto-CPP response data from September 29, 2005. If all twelve sites reached their maximum saving simultaneously, a total of approximately 2 MW of DR is available from these twelve sites that represent about two million ft{sup 2}. The average DR was about half that value, at about 1 MW. These savings translate to about 0.5 to 1.0 W/ft{sup 2} of demand reduction. They are continuing field demonstrations and economic evaluations to pursue increasing penetrations of automated DR that has demonstrated ability to provide a valuable DR resource for California.

  11. Chinese emissions peak: Not when, but how

    International Nuclear Information System (INIS)

    Spencer, Thomas; Colombier, Michel; Wang, Xin; Sartor, Oliver; Waisman, Henri

    2016-07-01

    It seems highly likely that China will overachieve its 2020 and 2030 targets, and peak its emissions before 2030 and possibly at a lower level than often assumed. This paper argues that the debate on the timing of the peak is misplaced: what matters is not when by why. For the peak to be seen as a harbinger of deep transformation, it needs to be based on significant macro-economic reform and restructuring, with attendant improvement in energy intensity. The Chinese economic model has been extraordinarily investment and resource intensive, and has driven the growth in GHG emissions. That model is no longer economically or environmentally sustainable. Therefore Chinese policy-makers are faced with a trade-off between slower short-term growth and economic reform, versus supporting short-term growth but slowing economic reform. The outcome will be crucial for the transition to a low-carbon economy. Overall, the 13. FYP (2016-2020) gives the impression of a cautious reflection of the new normal paradigm on the economic front, and a somewhat conservative translation of this shift into the energy and climate targets. Nonetheless, the 13. FYP targets set China well on the way to overachieving its 2020 pledge undertaken at COP15 in Copenhagen, and to potentially overachieving its INDC. It thus seems likely that China will achieve its emissions peak before 2030. However, the crucial question is not when China peaks, but whether the underlying transformation of the Chinese economy and energy system lays the basis for deep decarbonization thereafter. Thorough assessments of the implications of the 'new normal' for Chinese emissions and energy system trajectories, taking into account the link with the Chinese macro-economy, are needed. Scenarios provide a useful framework and should focus on a number of short-term uncertainties. Most energy system and emissions scenarios published today assume a continuity of trends between 2010-2015 and 2015-2020, which is at odds with clear

  12. Personal ways of handling everyday life

    DEFF Research Database (Denmark)

    Jensen, Lasse Meinert

    at variations in everyday life pursuits:  How does a person's pursuit of goals and concerns lead him/her to experience and handle breaks, interruptions, and variation in everyday activities?  The research project so far holds quantitative data.  A convenient sample of 217 persons were administered...

  13. Confluence Modulo Equivalence in Constraint Handling Rules

    DEFF Research Database (Denmark)

    Christiansen, Henning; Kirkeby, Maja Hanne

    2015-01-01

    Previous results on confluence for Constraint Handling Rules, CHR, are generalized to take into account user-defined state equivalence relations. This allows a much larger class of programs to enjoy the advantages of confluence, which include various optimization techniques and simplified...

  14. 9 CFR 3.142 - Handling.

    Science.gov (United States)

    2010-01-01

    ... Warmblooded Animals Other Than Dogs, Cats, Rabbits, Hamsters, Guinea Pigs, Nonhuman Primates, and Marine... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Handling. 3.142 Section 3.142 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE ANIMAL...

  15. WISE TECHNOLOGY FOR HANDLING BIG DATA FEDERATIONS

    NARCIS (Netherlands)

    Valentijn, E; Begeman, Kornelis; Belikov, Andrey; Boxhoorn, Danny; Verdoes Kleijn, Gijs; McFarland, John; Vriend, Willem-Jan; Williams, Owen; Soille, P.; Marchetti, P.G.

    2014-01-01

    The effective use of Big Data in current and future scientific missions requires intelligent data handling systems which are able to interface the user to complicated distributed data collections. We review the WISE Concept of Scientific Information Systems and the WISE solutions for the storage and

  16. 340 Waste Handling Facility interim safety basis

    International Nuclear Information System (INIS)

    Bendixsen, R.B.

    1995-01-01

    This document establishes the interim safety basis (ISB) for the 340 Waste Handling Facility (340 Facility). An ISB is a documented safety basis that provides a justification for the continued operation of the facility until an upgraded final safety analysis report is prepared that complies with US Department of Energy (DOE) Order 5480.23, Nuclear Safety Analysis Reports. The ISB for the 340 Facility documents the current design and operation of the facility. The 340 Facility ISB (ISB-003) is based on a facility walkdown and review of the design and operation of the facility, as described in the existing safety documentation. The safety documents reviewed, to develop ISB-003, include the following: OSD-SW-153-0001, Operating Specification Document for the 340 Waste Handling Facility (WHC 1990); OSR-SW-152-00003, Operating Limits for the 340 Waste Handling Facility (WHC 1989); SD-RE-SAP-013, Safety Analysis Report for Packaging, Railroad Liquid Waste Tank Cars (Mercado 1993); SD-WM-TM-001, Safety Assessment Document for the 340 Waste Handling Facility (Berneski 1994a); SD-WM-SEL-016, 340 Facility Safety Equipment List (Berneski 1992); and 340 Complex Fire Hazard Analysis, Draft (Hughes Assoc. Inc. 1994)

  17. 7 CFR 985.8 - Handle.

    Science.gov (United States)

    2010-01-01

    ... the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE MARKETING ORDER REGULATING THE HANDLING OF...: Provided, That: (a) The preparation for market of salable oil by producers who are not dealers or users, (b...

  18. Handling system for nuclear fuel pellet inspection

    International Nuclear Information System (INIS)

    Nyman, D.H.; McLemore, D.R.; Sturges, R.H.

    1978-11-01

    HEDL is developing automated fabrication equipment for fast reactor fuel. A major inspection operation in the process is the gaging of fuel pellets. A key element in the system has been the development of a handling system that reliably moves pellets at the rate of three per second without product damage or excessive equipment wear

  19. Combating wear in bulk solids handling plants

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    A total of five papers presented at a seminar on problems of wear caused by abrasive effects of materials in bulk handling. Topics of papers cover the designer viewpoint, practical experience from the steel, coal, cement and quarry industries to create an awareness of possible solutions.

  20. Emergency handling of radiation accident cases: firemen

    International Nuclear Information System (INIS)

    Procedures for the emergency handling of persons exposed to radiation or radioactive contamination are presented, with emphasis on information needed by firemen. The types of radiation accident patients that may be encountered are described and procedures for first aid, for preventing the spread of radioactive contamination, and for reporting the accident are outlined

  1. 340 waste handling facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  2. 7 CFR 981.16 - To handle.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false To handle. 981.16 Section 981.16 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... in any other way to put almonds grown in the area of production into any channel of trade for human...

  3. Ergonomics intervention in manual handling of oxygen

    Directory of Open Access Journals (Sweden)

    M Motamedzadeh

    2013-05-01

    Conclusion: With the implementation of ergonomic intervention is casting unit, the risk of exposure to musculoskeletal disorders caused by manual handling of oxygen cylinders was eliminated and safety of employees against the risk of explosion of the cylinders in comparison with before the intervention was improved.

  4. PREPD O and VE remote handling system

    International Nuclear Information System (INIS)

    Theil, T.N.

    1985-01-01

    The Process Experimental Pilot Plant (PREPP) at the Idaho National Engineering Laboratory is designed for volume reduction and packaging of transuranic (TRU) waste. The PREPP opening and verification enclosure (O and VE) remote handling system, within that facility, is designed to provide examination of the contents of various TRU waste storage containers. This remote handling system will provide the means of performing a hazardous operation that is currently performed manually. The TeleRobot to be used in this system is a concept that will incorporate and develop man in the loop operation (manual mode), standardized automatic sequencing of end effector tools, increased payload and reach over currently available computer-controlled robots, and remote handling of a hazardous waste operation. The system is designed within limited space constraints and an operation that was originally planned, and is currently being manually performed at other plants. The PREPP O and VE remote handling system design incorporates advancing technology to improve the working environment in the nuclear field

  5. Intertextuality for Handling Complex Environmental Issues

    Science.gov (United States)

    Byhring, Anne Kristine; Knain, Erik

    2016-01-01

    Nowhere is the need for handling complexity more pertinent than in addressing environmental issues. Our study explores students' situated constructs of complexity in unfolding discourses on socio-scientific issues. Students' dialogues in two group-work episodes are analysed in detail, with tools from Systemic Functional Linguistics. We identify…

  6. 7 CFR 996.4 - Handle.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Handle. 996.4 Section 996.4 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and... consumption channels of commerce: Provided, That this term does not include sales or deliveries of peanuts by...

  7. 7 CFR 982.7 - To handle.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false To handle. 982.7 Section 982.7 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and... hazelnuts, inshell or shelled, into the channels of trade either within the area of production or from such...

  8. Exploring Reflective Means to Handle Plagiarism

    Science.gov (United States)

    Dalal, Nikunj

    2016-01-01

    Plagiarism has become widespread in the university teaching environment. This article presents practical wisdom from several years of experience handling plagiarism in two Information Systems (IS) courses with the exploratory use of reflective means such as dialogues and essays. There has been very little work on the use of reflective approaches…

  9. Remote technologies for handling spent fuel

    International Nuclear Information System (INIS)

    Ramakumar, M.S.

    1999-01-01

    The nuclear programme in India involves building and operating power and research reactors, production and use of isotopes, fabrication of reactor fuel, reprocessing of irradiated fuel, recovery of plutonium and uranium-233, fabrication of fuel containing plutonium-239, uranium-233, post-irradiation examination of fuel and hardware and handling solid and liquid radioactive wastes. Fuel that could be termed 'spent' in thermal reactors is a source for second generation fuel (plutonium and uranium-233). Therefore, it is only logical to extend remote techniques beyond handling fuel from thermal reactors to fuel from fast reactors, post-irradiation examination etc. Fabrication of fuel containing plutonium and uranium-233 poses challenges in view of restriction on human exposure to radiation. Hence, automation will serve as a step towards remotisation. Automated systems, both rigid and flexible (using robots) need to be developed and implemented. Accounting of fissile material handled by robots in local area networks with appropriate access codes will be possible. While dealing with all these activities, it is essential to pay attention to maintenance and repair of the facilities. Remote techniques are essential here. There are a number of commonalities in these requirements and so development of modularized subsystems, and integration of different configurations should receive attention. On a long-term basis, activities like decontamination, decommissioning of facilities and handling of waste generated have to be addressed. While robotized remote systems have to be designed for existing facilities, future designs of facilities should take into account total operation with robotic remote systems. (author)

  10. 21 CFR 820.140 - Handling.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Handling. 820.140 Section 820.140 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES... manufacturer shall establish and maintain procedures to ensure that mixups, damage, deterioration...

  11. Guidance Counsellor Strategies for Handling Bullying

    Science.gov (United States)

    Power-Elliott, Michleen; Harris, Gregory E.

    2012-01-01

    The purpose of this exploratory-descriptive study was to examine how guidance counsellors in the province of Newfoundland and Labrador would handle a specific verbal-relational bullying incident. Also of interest was guidance counsellor involvement and training in bullying programmes and Positive Behaviour Supports. Data for this study was…

  12. Handling and disposing of radioactive waste

    International Nuclear Information System (INIS)

    Trauger, D.B.

    1983-01-01

    Radioactive waste has been separated by definition into six categories. These are: commercial spent fuel; high-level wastes; transuranium waste; low-level wastes; decommissioning and decontamination wastes; and mill tailings and mine wastes. Handling and disposing of these various types of radioactive wastes are discussed briefly

  13. Biodiesel Handling and Use Guide (Fifth Edition)

    Energy Technology Data Exchange (ETDEWEB)

    Alleman, T.L.; McCormick, R.L.; Christensen, E.D.; Fioroni, G.; Moriarty. K.; Yanowitz, J.

    2016-11-08

    This document is a guide for those who blend, distribute, and use biodiesel and biodiesel blends. It provides basic information on the proper and safe use of biodiesel and biodiesel blends in engines and boilers, and is intended to help fleets, individual users, blenders, distributors, and those involved in related activities understand procedures for handling and using biodiesel fuels.

  14. Instrumentation to handle thermal polarized neutron beams

    NARCIS (Netherlands)

    Kraan, W.H.

    2004-01-01

    In this thesis we investigate devices needed to handle the polarization of thermal neutron beams: Ï/2-flippers (to start/stop Larmor precession) and Ï-flippers (to reverse polarization/precession direction) and illustrate how these devices are used to investigate the properties of matter and of the

  15. Confluence Modulo Equivalence in Constraint Handling Rules

    DEFF Research Database (Denmark)

    Christiansen, Henning; Kirkeby, Maja Hanne

    2014-01-01

    Previous results on confluence for Constraint Handling Rules, CHR, are generalized to take into account user-defined state equivalence relations. This allows a much larger class of programs to enjoy the ad- vantages of confluence, which include various optimization techniques and simplified...

  16. 340 waste handling facility interim safety basis

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  17. Remote-handled transuranic system assessment appendices. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    Volume 2 of this report contains six appendices to the report: Inventory and generation of remote-handled transuranic waste; Remote-handled transuranic waste site storage; Characterization of remote-handled transuranic waste; RH-TRU waste treatment alternatives system analysis; Packaging and transportation study; and Remote-handled transuranic waste disposal alternatives.

  18. Remote-handled transuranic system assessment appendices. Volume 2

    International Nuclear Information System (INIS)

    1995-11-01

    Volume 2 of this report contains six appendices to the report: Inventory and generation of remote-handled transuranic waste; Remote-handled transuranic waste site storage; Characterization of remote-handled transuranic waste; RH-TRU waste treatment alternatives system analysis; Packaging and transportation study; and Remote-handled transuranic waste disposal alternatives

  19. Demand response concepts in the German industry; Konzepte zur Lastreaktion in der deutschen Industrie

    Energy Technology Data Exchange (ETDEWEB)

    Roon, Serafin von; Gobmaier, Thomas [Forschungsstelle fuer Energiewirtschaft (FfE) e.V., Muenchen (Germany)

    2011-07-01

    In the German industry the concept of load management for peak shaving is well established. Pooling these reserve power enables reliable power supply at short notice. In the U.S. this business concept - called Demand Response - is already quite successful. The article summarizes findings on the status quo and the technical and economic potential of implementing Demand Response in the German industry. (orig.)

  20. Demand Shifting With Thermal Mass in Large Commercial Buildings:Field Tests, Simulation and Audits

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Peng; Haves, Philip; Piette, Mary Ann; Zagreus, Leah

    2005-09-01

    The principle of pre-cooling and demand limiting is to pre-cool buildings at night or in the morning during off-peak hours, storing cooling in the building thermal mass and thereby reducing cooling loads and reducing or shedding related electrical demand during the peak periods. Cost savings are achieved by reducing on-peak energy and demand charges. The potential for utilizing building thermal mass for load shifting and peak demand reduction has been demonstrated in a number of simulation, laboratory, and field studies (Braun 1990, Ruud et al. 1990, Conniff 1991, Andresen and Brandemuehl 1992, Mahajan et al. 1993, Morris et al. 1994, Keeney and Braun 1997, Becker and Paciuk 2002, Xu et al. 2003). This technology appears to have significant potential for demand reduction if applied within an overall demand response program. The primary goal associated with this research is to develop information and tools necessary to assess the viability of and, where appropriate, implement demand response programs involving building thermal mass in buildings throughout California. The project involves evaluating the technology readiness, overall demand reduction potential, and customer acceptance for different classes of buildings. This information can be used along with estimates of the impact of the strategies on energy use to design appropriate incentives for customers.