WorldWideScience

Sample records for hammer drilling performance a

  1. OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE - A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING

    Energy Technology Data Exchange (ETDEWEB)

    Arnis Judzis

    2003-01-01

    This document details the progress to date on the ''OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE -- A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING'' contract for the quarter starting October 2002 through December 2002. Even though we are awaiting the optimization portion of the testing program, accomplishments included the following: (1) Smith International participated in the DOE Mud Hammer program through full scale benchmarking testing during the week of 4 November 2003. (2) TerraTek acknowledges Smith International, BP America, PDVSA, and ConocoPhillips for cost-sharing the Smith benchmarking tests allowing extension of the contract to add to the benchmarking testing program. (3) Following the benchmark testing of the Smith International hammer, representatives from DOE/NETL, TerraTek, Smith International and PDVSA met at TerraTek in Salt Lake City to review observations, performance and views on the optimization step for 2003. (4) The December 2002 issue of Journal of Petroleum Technology (Society of Petroleum Engineers) highlighted the DOE fluid hammer testing program and reviewed last years paper on the benchmark performance of the SDS Digger and Novatek hammers. (5) TerraTek's Sid Green presented a technical review for DOE/NETL personnel in Morgantown on ''Impact Rock Breakage'' and its importance on improving fluid hammer performance. Much discussion has taken place on the issues surrounding mud hammer performance at depth conditions.

  2. Optimization of Mud Hammer Drilling Performance--A Program to Benchmark the Viability of Advanced Mud Hammer Drilling

    Energy Technology Data Exchange (ETDEWEB)

    Arnis Judzis

    2006-03-01

    Operators continue to look for ways to improve hard rock drilling performance through emerging technologies. A consortium of Department of Energy, operator and industry participants put together an effort to test and optimize mud driven fluid hammers as one emerging technology that has shown promise to increase penetration rates in hard rock. The thrust of this program has been to test and record the performance of fluid hammers in full scale test conditions including, hard formations at simulated depth, high density/high solids drilling muds, and realistic fluid power levels. This paper details the testing and results of testing two 7 3/4 inch diameter mud hammers with 8 1/2 inch hammer bits. A Novatek MHN5 and an SDS Digger FH185 mud hammer were tested with several bit types, with performance being compared to a conventional (IADC Code 537) tricone bit. These tools functionally operated in all of the simulated downhole environments. The performance was in the range of the baseline ticone or better at lower borehole pressures, but at higher borehole pressures the performance was in the lower range or below that of the baseline tricone bit. A new drilling mode was observed, while operating the MHN5 mud hammer. This mode was noticed as the weight on bit (WOB) was in transition from low to high applied load. During this new ''transition drilling mode'', performance was substantially improved and in some cases outperformed the tricone bit. Improvements were noted for the SDS tool while drilling with a more aggressive bit design. Future work includes the optimization of these or the next generation tools for operating in higher density and higher borehole pressure conditions and improving bit design and technology based on the knowledge gained from this test program.

  3. OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE - A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING

    Energy Technology Data Exchange (ETDEWEB)

    Alan Black; Arnis Judzis

    2003-01-01

    Progress during current reporting year 2002 by quarter--Progress during Q1 2002: (1) In accordance to Task 7.0 (D. No.2 Technical Publications) TerraTek, NETL, and the Industry Contributors successfully presented a paper detailing Phase 1 testing results at the February 2002 IADC/SPE Drilling Conference, a prestigious venue for presenting DOE and private sector drilling technology advances. The full reference is as follows: IADC/SPE 74540 ''World's First Benchmarking of Drilling Mud Hammer Performance at Depth Conditions'' authored by Gordon A. Tibbitts, TerraTek; Roy C. Long, US Department of Energy, Brian E. Miller, BP America, Inc.; Arnis Judzis, TerraTek; and Alan D. Black, TerraTek. Gordon Tibbitts, TerraTek, will presented the well-attended paper in February of 2002. The full text of the Mud Hammer paper was included in the last quarterly report. (2) The Phase 2 project planning meeting (Task 6) was held at ExxonMobil's Houston Greenspoint offices on February 22, 2002. In attendance were representatives from TerraTek, DOE, BP, ExxonMobil, PDVSA, Novatek, and SDS Digger Tools. (3) PDVSA has joined the advisory board to this DOE mud hammer project. PDVSA's commitment of cash and in-kind contributions were reported during the last quarter. (4) Strong Industry support remains for the DOE project. Both Andergauge and Smith Tools have expressed an interest in participating in the ''optimization'' phase of the program. The potential for increased testing with additional Industry cash support was discussed at the planning meeting in February 2002. Progress during Q2 2002: (1) Presentation material was provided to the DOE/NETL project manager (Dr. John Rogers) for the DOE exhibit at the 2002 Offshore Technology Conference. (2) Two meeting at Smith International and one at Andergauge in Houston were held to investigate their interest in joining the Mud Hammer Performance study. (3) SDS Digger Tools (Task 3

  4. Development of a Piezoelectric Rotary Hammer Drill

    Science.gov (United States)

    Domm, Lukas N.

    2011-01-01

    The Piezoelectric Rotary Hammer Drill is designed to core through rock using a combination of rotation and high frequency hammering powered by a single piezoelectric actuator. It is designed as a low axial preload, low mass, and low power device for sample acquisition on future missions to extraterrestrial bodies. The purpose of this internship is to develop and test a prototype of the Piezoelectric Rotary Hammer Drill in order to verify the use of a horn with helical or angled cuts as a hammering and torque inducing mechanism. Through an iterative design process using models in ANSYS Finite Element software and a Mason's Equivalent Circuit model in MATLAB, a horn design was chosen for fabrication based on the predicted horn tip motion, electromechanical coupling, and neutral plane location. The design was then machined and a test bed assembled. The completed prototype has proven that a single piezoelectric actuator can be used to produce both rotation and hammering in a drill string through the use of a torque inducing horn. Final data results include bit rotation produced versus input power, and best drilling rate achieved with the prototype.

  5. Ultrasonic rotary-hammer drill

    Science.gov (United States)

    Bar-Cohen, Yoseph (Inventor); Badescu, Mircea (Inventor); Sherrit, Stewart (Inventor); Bao, Xiaoqi (Inventor); Kassab, Steve (Inventor)

    2010-01-01

    A mechanism for drilling or coring by a combination of sonic hammering and rotation. The drill includes a hammering section with a set of preload weights mounted atop a hammering actuator and an axial passage through the hammering section. In addition, a rotary section includes a motor coupled to a drive shaft that traverses the axial passage through the hammering section. A drill bit is coupled to the drive shaft for drilling by a combination of sonic hammering and rotation. The drill bit includes a fluted shaft leading to a distal crown cutter with teeth. The bit penetrates sampled media by repeated hammering action. In addition, the bit is rotated. As it rotates the fluted bit carries powdered cuttings helically upward along the side of the bit to the surface.

  6. High-tech hammer : BBJ Tools transforms the traditional fluid hammer into a revolutionary drilling tool

    Energy Technology Data Exchange (ETDEWEB)

    Byfield, M.

    2010-12-15

    This article described BBJ Tools' patent-pending fluid hammer that enhances drilling rate of penetration. The technology was awarded the 2010 winner for best drilling technology for a company with fewer than 100 employees. The fluid hammer features several improvements in terms of maintaining drill-bit integrity, steering ability, and operating flexibility. The hammer incorporates a positive displacement motor and adjustable housing that uniquely allow the driller to steer the drill bit. The fluid hammer works with both polycrystalline diamond compact bits and roller cones. The unique weight-to-bit-transfer design allows the operator to have diversified percussion control. More weight on the bit results in more force, and hammering stops when weight is taken off the bit. The major components of the mud motor are incorporated into the fluid hammer, allowing the tool to compete in every application in which a mud motor is used. The percussion mechanism transmits left-hand reactive torque to the housing. The rate of penetration is substantially better than other similar tools on the market. 2 figs.

  7. Design of a water-powered DTH hammer for deep drilling application

    Science.gov (United States)

    Cho, Min Jae; Kim, Donguk; Oh, Joo Young; Yook, Se-Jin; Kim, Young Won

    2017-11-01

    A DTH (Down-the-hole) hammer powered by highly pressurized fluid is a drilling tool using the motion of percussion of a drill bit. In retrospect, a DTH by using compressed air as a power source has been widely used in drilling industries such as applications of mining, geothermal etc. On the other hand, another type of a DTH that uses pressurized water, called a water hammer, has recently seen deep drilling applications, while it has been rarely investigated. In this study, we designed a water-powered DTH hammer which mainly consists of several components such as a piston, a poppet valve, a cap and a bit for deep drilling applications. We optimized the components of the hammer on the basis of the results of 1D analysis using commercial software of AMESIM. An experimental study has been also conducted to investigate a performance of the designed water hammer. We measured a pressure distribution inside the hammer system as a function of time, and it thus estimates a frequency of impaction of the bit, which has been also analyzed in frequency domain. In addition, some important parameters have been discussed in conjunction with a limitation of impaction frequency as input pressure. We believe that this study provides design rules of a water-based DTH for deep drilling applications. This work is supported by KITECH of Korean government.

  8. Percussive Augmenter of Rotary Drills for Operating as a Rotary-Hammer Drill

    Science.gov (United States)

    Aldrich, Jack Barron (Inventor); Bar-Cohen, Yoseph (Inventor); Sherrit, Stewart (Inventor); Badescu, Mircea (Inventor); Bao, Xiaoqi (Inventor); Scott, James Samson (Inventor)

    2014-01-01

    A percussive augmenter bit includes a connection shaft for mounting the bit onto a rotary drill. In a first modality, an actuator percussively drives the bit, and an electric slip-ring provides power to the actuator while being rotated by the drill. Hammering action from the actuator and rotation from the drill are applied directly to material being drilled. In a second modality, a percussive augmenter includes an actuator that operates as a hammering mechanism that drives a free mass into the bit creating stress pulses that fracture material that is in contact with the bit.

  9. A Universal Rig for Supporting Large Hammer Drills: Reduced Injury Risk and Improved Productivity.

    Science.gov (United States)

    Rempel, David; Barr, Alan

    2015-10-01

    Drilling holes into concrete with heavy hammer and rock drills is one of the most physically demanding tasks performed in commercial construction and poses risks for musculoskeletal disorders, noise induced hearing loss, hand arm vibration syndrome and silicosis. The aim of this study was to (1) use a participatory process to develop a rig to support pneumatic rock drills or large electric hammer drills in order to reduce the health risks and (2) evaluate the usability of the rig. Seven prototype rigs for supporting large hammer drills were developed and modified with feedback from commercial contractors and construction workers. The final design was evaluated by laborers and electricians (N=29) who performed their usual concrete drilling with the usual method and the new rig. Subjective regional fatigue was significantly less in the neck, shoulders, hands and arms, and lower back) when using the universal rig compared to the usual manual method. Usability ratings for the rig were significantly better than the usual method on stability, control, drilling, accuracy, and vibration. Drilling time was reduced by approximately 50% with the rig. Commercial construction contractors, laborers and electricians who use large hammer drills for drilling many holes should consider using such a rig to prevent musculoskeletal disorders, fatigue, and silicosis.

  10. Theoretical analysis and design of hydro-hammer with a jet actuator: An engineering application to improve the penetration rate of directional well drilling in hard rock formations.

    Science.gov (United States)

    He, Jiang-Fu; Liang, Yun-Pei; Li, Li-Jia; Luo, Yong-Jiang

    2018-01-01

    Rapid horizontal directional well drilling in hard or fractured formations requires efficient drilling technology. The penetration rate of conventional hard rock drilling technology in horizontal directional well excavations is relatively low, resulting in multiple overgrinding of drill cuttings in bottom boreholes. Conventional drilling techniques with reamer or diamond drill bit face difficulties due to the long construction periods, low penetration rates, and high engineering costs in the directional well drilling of hard rock. To improve the impact energy and penetration rate of directional well drilling in hard formations, a new drilling system with a percussive and rotary drilling technology has been proposed, and a hydro-hammer with a jet actuator has also been theoretically designed on the basis of the impulse hydro-turbine pressure model. In addition, the performance parameters of the hydro-hammer with a jet actuator have been numerically and experimentally analyzed, and the influence of impact stroke and pumped flow rate on the motion velocity and impact energy of the hydro-hammer has been obtained. Moreover, the designed hydro-hammer with a jet actuator has been applied to hard rock drilling in a trenchless drilling program. The motion velocity of the hydro-hammer ranges from 1.2 m/s to 3.19 m/s with diverse flow rates and impact strokes, and the motion frequency ranges from 10 Hz to 22 Hz. Moreover, the maximum impact energy of the hydro-hammer is 407 J, and the pumped flow rate is 2.3 m3/min. Thus, the average penetration rate of the optimized hydro-hammer improves by over 30% compared to conventional directional drilling in hard rock formations.

  11. Downhole drilling hammer. Marteau de forage

    Energy Technology Data Exchange (ETDEWEB)

    Techy, M.

    1987-07-28

    This invention concerns a drilling hammer of the downhole type, comprising a tubular body fed by compressed air, a drilling cutter and a hammer piston set into movement inside an interior cylinder by a compressed air distribution mechanism alternately above and below the piston. The hammer includes a gas-oil injection device in the chamber above the piston and a mechanism for initiating the injection during the rising of the piston; the additional compression provokes the combustion of the gas-oil-air mixture, which hurls the piston towards the cutter. This type of apparatus permits an important reduction in costs of materials and of operation, and permits at the same time an increase in drilling power and a reduction in energy consumption. 8 figs.

  12. Auto-Gopher: A Wire-Line Rotary-Hammer Ultrasonic Drill

    Science.gov (United States)

    Badescu, Mircea; Sherrit, Stewart; Bao, Xiaogi; Bar-Cohen, Yoseph; Chen, Beck

    2011-01-01

    Developing technologies that would enable NASA to sample rock, soil, and ice by coring, drilling or abrading at a significant depth is of great importance for a large number of in-situ exploration missions as well as for earth applications. Proven techniques to sample Mars subsurface will be critical for future NASA astrobiology missions that will search for records of past and present life on the planet, as well as, the search for water and other resources. A deep corer, called Auto-Gopher, is currently being developed as a joint effort of the JPL's NDEAA laboratory and Honeybee Robotics Corp. The Auto-Gopher is a wire-line rotary-hammer drill that combines rock breaking by hammering using an ultrasonic actuator and cuttings removal by rotating a fluted bit. The hammering mechanism is based on the Ultrasonic/Sonic Drill/Corer (USDC) that has been developed as an adaptable tool for many of drilling and coring applications. The USDC uses an intermediate free-flying mass to transform the high frequency vibrations of the horn tip into a sonic hammering of a drill bit. The USDC concept was used in a previous task to develop an Ultrasonic/Sonic Ice Gopher. The lessons learned from testing the ice gopher were implemented into the design of the Auto-Gopher by inducing a rotary motion onto the fluted coring bit. A wire-line version of such a system would allow penetration of significant depth without a large increase in mass. A laboratory version of the corer was developed in the NDEAA lab to determine the design and drive parameters of the integrated system. The design configuration lab version of the design and fabrication and preliminary testing results are presented in this paper

  13. Enhancing down-the-hole air hammer capacity in directional drilling

    Science.gov (United States)

    Klishin, V. I.; Timonin, V. V.; Kokoulin, D. I.; Alekseev, S. E.; Kubanychbek, B.

    2017-09-01

    The authors discuss the issue connected with drilling trajectory deviation and present the technique of rotary-percussion drilling with a down-the-hole air hammer. The article describes pilot testing of the air hammer drill PNB76 in Berezovskaya Mine. The ways of improving the air hammer drill are identified, and the basic diagram and R&D test data are given.

  14. Ultrasonic/Sonic Rotary-Hammer Drills

    Science.gov (United States)

    Badescu, Mircea; Sherrit, Stewart; Bar-Cohen, Yoseph; Bao, Xiaoqi; Kassab, Steve

    2010-01-01

    Ultrasonic/sonic rotary-hammer drill (USRoHD) is a recent addition to the collection of apparatuses based on ultrasonic/sonic drill corer (USDC). As described below, the USRoHD has several features, not present in a basic USDC, that increase efficiency and provide some redundancy against partial failure. USDCs and related apparatuses were conceived for boring into, and/or acquiring samples of, rock or other hard, brittle materials of geological interest. They have been described in numerous previous NASA Tech Briefs articles. To recapitulate: A USDC can be characterized as a lightweight, lowpower, piezoelectrically driven jackhammer in which ultrasonic and sonic vibrations are generated and coupled to a tool bit. A basic USDC includes a piezoelectric stack, an ultrasonic transducer horn connected to the stack, a free mass ( free in the sense that it can bounce axially a short distance between hard stops on the horn and the bit), and a tool bit. The piezoelectric stack creates ultrasonic vibrations that are mechanically amplified by the horn. The bouncing of the free mass between the hard stops generates the sonic vibrations. The combination of ultrasonic and sonic vibrations gives rise to a hammering action (and a resulting chiseling action at the tip of the tool bit) that is more effective for drilling than is the microhammering action of ultrasonic vibrations alone. The hammering and chiseling actions are so effective that unlike in conventional twist drilling, little applied axial force is needed to make the apparatus advance into the material of interest. There are numerous potential applications for USDCs and related apparatuses in geological exploration on Earth and on remote planets. In early USDC experiments, it was observed that accumulation of cuttings in a drilled hole causes the rate of penetration of the USDC to decrease steeply with depth, and that the rate of penetration can be increased by removing the cuttings. The USRoHD concept provides for

  15. Optimizing drilling performance using a selected drilling fluid

    Science.gov (United States)

    Judzis, Arnis [Salt Lake City, UT; Black, Alan D [Coral Springs, FL; Green, Sidney J [Salt Lake City, UT; Robertson, Homer A [West Jordan, UT; Bland, Ronald G [Houston, TX; Curry, David Alexander [The Woodlands, TX; Ledgerwood, III, Leroy W.

    2011-04-19

    To improve drilling performance, a drilling fluid is selected based on one or more criteria and to have at least one target characteristic. Drilling equipment is used to drill a wellbore, and the selected drilling fluid is provided into the wellbore during drilling with the drilling equipment. The at least one target characteristic of the drilling fluid includes an ability of the drilling fluid to penetrate into formation cuttings during drilling to weaken the formation cuttings.

  16. Drilling, Coring and Sampling Using Piezoelectric Actuated Mechanisms: From the USDC to a Piezo-Rotary-Hammer Drill

    Science.gov (United States)

    Bar-Cohen, Yoseph; Sherrit, Stewart; Badescu, Mircea; Bao, Xiaoqi

    2012-01-01

    NASA exploration missions are increasingly including sampling tasks but with the growth in engineering experience (particularly, Phoenix Scout and MSL) it is now very much recognized that planetary drilling poses many challenges. The difficulties grow significantly with the hardness of sampled material, the depth of drilling and the harshness of the environmental conditions. To address the requirements for samplers that could be operated at the conditions of the various bodies in the solar system, a number of piezoelectric actuated drills and corers were developed by the Advanced Technologies Group of JPL. The basic configuration that was conceived in 1998 is known as the Ultrasonic/Sonic Driller/Corer (USDC), and it operates as a percussive mechanism. This drill requires as low preload as 10N (important for operation at low gravity) allowing to operate with as low-mass device as 400g, use an average power as low as 2- 3W and drill rocks as hard as basalt. A key feature of this drilling mechanism is the use of a free-mass to convert the ultrasonic vibrations generated by piezoelectric stack to sonic impacts on the bit. Using the versatile capabilities f the USDC led to the development of many configurations and device sizes. Significant improvement of the penetration rate was achieved by augmenting the hammering action by rotation and use of a fluted bit to remove cuttings. To reach meters deep in ice a wireline drill was developed called the Ultrasonic/Sonic Gopher and it was demonstrated in 2005 to penetrate about 2-m deep at Antarctica. Jointly with Honeybee Robotics, this mechanism is currently being modified to incorporate rotation and inchworm operation forming Auto-Gopher to reach meters deep in rocks. To take advantage of the ability of piezoelectric actuators to operate over a wide temperatures range, piezoelectric actuated drills were developed and demonstrated to operate at as cold as -200oC and as hot as 500oC. In this paper, the developed mechanisms

  17. Voice Coil Percussive Mechanism Concept for Hammer Drill

    Science.gov (United States)

    Okon, Avi

    2009-01-01

    A hammer drill design of a voice coil linear actuator, spring, linear bearings, and a hammer head was proposed. The voice coil actuator moves the hammer head to produce impact to the end of the drill bit. The spring is used to store energy on the retraction and to capture the rebound energy after each impact for use in the next impact. The maximum actuator stroke is 20 mm with the hammer mass being 200 grams. This unit can create impact energy of 0.4 J with 0.8 J being the maximum. This mechanism is less complex than previous devices meant for the same task, so it has less mass and less volume. Its impact rate and energy are easily tunable without changing major hardware components. The drill can be driven by two half-bridges. Heat is removed from the voice coil via CO2 conduction.

  18. Sliding pressure control valve for pneumatic hammer drill

    Science.gov (United States)

    Polsky, Yarom [Albuquerque, NM

    2011-08-30

    A pneumatic device control apparatus and method comprising a ported valve slidably fitted over a feed tube of the pneumatic device, and using a compliant biasing device to constrain motion of the valve to provide asymmetric timing for extended pressurization of a power chamber and reduced pressurization of a return chamber of the pneumatic device. The pneumatic device can be a pneumatic hammer drill.

  19. The Effects of Bit Wear on Respirable Silica Dust, Noise and Productivity: A Hammer Drill Bench Study.

    Science.gov (United States)

    Carty, Paul; Cooper, Michael R; Barr, Alan; Neitzel, Richard L; Balmes, John; Rempel, David

    2017-07-01

    Hammer drills are used extensively in commercial construction for drilling into concrete for tasks including rebar installation for structural upgrades and anchor bolt installation. This drilling task can expose workers to respirable silica dust and noise. The aim of this pilot study was to evaluate the effects of bit wear on respirable silica dust, noise, and drilling productivity. Test bits were worn to three states by drilling consecutive holes to different cumulative drilling depths: 0, 780, and 1560 cm. Each state of bit wear was evaluated by three trials (nine trials total). For each trial, an automated laboratory test bench system drilled 41 holes 1.3 cm diameter, and 10 cm deep into concrete block at a rate of one hole per minute using a commercially available hammer drill and masonry bits. During each trial, dust was continuously captured by two respirable and one inhalable sampling trains and noise was sampled with a noise dosimeter. The room was thoroughly cleaned between trials. When comparing results for the sharp (0 cm) versus dull bit (1560 cm), the mean respirable silica increased from 0.41 to 0.74 mg m-3 in sampler 1 (P = 0.012) and from 0.41 to 0.89 mg m-3 in sampler 2 (P = 0.024); levels above the NIOSH recommended exposure limit of 0.05 mg m-3. Likewise, mean noise levels increased from 112.8 to 114.4 dBA (P < 0.00001). Drilling productivity declined with increasing wear from 10.16 to 7.76 mm s-1 (P < 0.00001). Increasing bit wear was associated with increasing respirable silica dust and noise and reduced drilling productivity. The levels of dust and noise produced by these experimental conditions would require dust capture, hearing protection, and possibly respiratory protection. The findings support the adoption of a bit replacement program by construction contractors. © The Author 2017. Published by Oxford University Press on behalf of the British Occupational Hygiene Society.

  20. INTEGRATED DRILLING SYSTEM USING MUD ACTUATED DOWN HOLE HAMMER AS PRIMARY ENGINE

    Energy Technology Data Exchange (ETDEWEB)

    John V. Fernandez; David S. Pixton

    2005-12-01

    A history and project summary of the development of an integrated drilling system using a mud-actuated down-hole hammer as its primary engine are given. The summary includes laboratory test results, including atmospheric tests of component parts and simulated borehole tests of the hammer system. Several remaining technical hurdles are enumerated. A brief explanation of commercialization potential is included. The primary conclusion for this work is that a mud actuated hammer can yield substantial improvements to drilling rate in overbalanced, hard rock formations. A secondary conclusion is that the down-hole mud actuated hammer can serve to provide other useful down-hole functions including generation of high pressure mud jets, generation of seismic and sonic signals, and generation of diagnostic information based on hammer velocity profiles.

  1. Single Piezo-Actuator Rotary-Hammering Drill

    Science.gov (United States)

    Sherrit, Stewart; Bao, Xiaoqi; Badescu, Mircea; Bar-Cohen, Yoseph

    2011-01-01

    This innovation comprises a compact drill that uses low-axial preload, via vibrations, that fractures the rock under the bit kerf, and rotates the bit to remove the powdered cuttings while augmenting the rock fracture via shear forces. The vibrations fluidize the powered cuttings inside the flutes around the bit, reducing the friction with the auger surface. These combined actions reduce the consumed power and the heating of the drilled medium, helping to preserve the pristine content of the produced samples. The drill consists of an actuator that simultaneously impacts and rotates the bit by applying force and torque via a single piezoelectric stack actuator without the need for a gearbox or lever mechanism. This reduces the development/fabrication cost and complexity. The piezoelectric actuator impacts the surface and generates shear forces, fragmenting the drilled medium directly under the bit kerf by exceeding the tensile and/or shear strength of the struck surface. The percussive impact action of the actuator leads to penetration of the medium by producing a zone of finely crushed rock directly underneath the struck location. This fracturing process is highly enhanced by the shear forces from the rotation and twisting action. To remove the formed cuttings, the bit is constructed with an auger on its internal or external surface. One of the problems with pure hammering is that, as the teeth become embedded in the sample, the drilling efficiency drops unless the teeth are moved away from the specific footprint location. By rotating the teeth, they are moved to areas that were not fragmented, and thus the rock fracturing is enhanced via shear forces. The shear motion creates ripping or chiseling action to produce larger fragments to increase the drilling efficiency, and to reduce the required power. The actuator of the drill consists of a piezoelectric stack that vibrates the horn. The stack is compressed by a bolt between the backing and the horn in order to

  2. Air distribution system with the discharge action in the working cavity of downhole air hammer drills

    Science.gov (United States)

    Timonin, VV; Alekseev, SE; Kokoulin, DI; Kubanychbek, B.

    2018-03-01

    It is proposed to carry out pre-mine methane drainage using underground degassing holes made by downhole air hammer drills. The features of downhole air drills are described. The downhole air drill layout with the simple-shape striking part is presented with its pluses and minuses. The researchers point at available options to eliminate the shortcomings. The improved layout of the downhole air hammer drill is suggested. The paper ends with the test data on the prototype air hammer drill, its characteristics and trial drilling results.

  3. Single Piezo-Actuator Rotary-Hammering (SPaRH) Drill

    Science.gov (United States)

    Sherrit, Stewart (Inventor); Bao, Xiaoqi (Inventor); Badescu, Mircea (Inventor); Bar-Cohen, Yoseph (Inventor)

    2014-01-01

    A Single Piezo-Actuator Rotary-Hammering (SPaRH) Drill includes a horn actuator having high power piezoelectric materials and a flexure pre-stress to increase the actuators effectiveness. The drill is a low mass, low power, compact coring drill measuring 20-cm high by 7-cm diameter and having a total weight of 2 kg including drive electronics. Using an average power of 50-Watts, the drill basalt is expected to cut basalt at a rate of 0.2 cm/min down to depth of 10-cm and create cuttings and an intact core. The drill is expected to operate under different environments including Martian ambient (6 Torr and down to -50 degree C), and liquid nitrogen temperatures (77 K) and low pressure (<<1 Torr) to simulate lunar polar and Europa conditions. Materials expected to be sampled include Kaolinite, Saddleback Basalt, Limestone, Volcanic Breccia, Siltstone, ice, permafrost and layered rocks with different hardness.

  4. Application of air hammer drilling technology in igneous rocks of Junggar basin

    Science.gov (United States)

    Zhao, Hongshan; Feng, Guangtong; Yu, Haiye

    2018-03-01

    There were many technical problems such as serious well deviation, low penetration rate and long drilling cycle in igneous rocks because of its hardness, strong abrasive and poor drillability, which severely influenced the exploration and development process of Junggar basin. Through analyzing the difficulties of gas drilling with roller bits in Well HS 2, conducting the mechanics experiments about igneous rock, and deeply describing the rock-breaking mechanism of air hammer drilling and its adaptability in igneous rocks, air hammer drilling can realize deviation control and fast drilling in igneous rocks of piedmont zone and avoid the wear and fatigue fracture of drilling strings due to its characteristics of low WOB, low RPM and high frequency impact. Through firstly used in igneous rocks of Well HS 201, compared with gas drilling with cone bit, the average penetration rate and one-trip footage of air hammer drilling respectively increased by more than 2.45 times and 6.42 times while the well deviation was always controlled less than 2 degrees. Two records for Block HS were set up such as the fastest penetration rate of 14.29m/h in Φ444.5mm well hole and the highest one-trip footage of 470.62m in Φ311.2mm well hole. So air hammer drilling was an effective way to realize optimal and fast drilling in the igneous rock formation of Junggar basin.

  5. Hammer's Monsters: A Screen Bestiary

    OpenAIRE

    Jones, Matthew; Chibnall, S.

    2016-01-01

    This public exhibition, housed in the DMU Heritage Centre, ran from October 2016 to October 2017. It displayed materials from the Hammer Script Archive held by the Cinema and Television History (CATH) Research Centre at DMU and provided a critical and historical commentary on these materials. Locating the archival objects and images within the industrial and creative history of the iconic Hammer Film Productions, the exhibition invited the public to reflect on the place of this studio within ...

  6. A Comparative Analysis of the Rebound Hammer and Ultrasonic ...

    African Journals Online (AJOL)

    This work presents a study on the comparison between some non-destructive testing tech-niques (Rebound Hammer and Ultrasonic Pulse Velocity). Tests were performed to com-pare the accuracy between the rebound hammer and the ultrasonic pulse velocity methodin estimating the strength of concrete. Eighty samples ...

  7. Deep drilling KLX 02. Drilling and documentation of a 1700 m deep borehole at Laxemar, Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, O [VBB VIAK AB, Malmoe (Sweden)

    1994-08-01

    In this report the preparation and execution of the deep core drilling KLX 02 is described. The hole was drilled with the wireline methods, NQ dimension (diameter 76 mm), to a final depth of 1700.5 m. Prior to core drilling a diameter 215 mm pilot hole was pre drilled to 200 m with controlled hammer drilling (DTH). In this hole casing and air-lift equipment was installed with the aim to support the circulation of drilling fluid. During core drilling there was a measurement of major drilling parameters and drilling fluid in and out of hole. As a fluid tracer uranine was used. Each 300 m of core drilling air-lift pump tests were performed. After completion a flow-meter log was run to finalize the project phase. It can be concluded that both the pre drilling and core drilling methods used proved to be successful. No severe technical problem occurred. However, potential risks have been pointed at in the report. The air-lift system functioned only partly and has to be modified for further use. Also the technique for monitoring of drilling parameters needs improvement as does the method for air-lift pump tests with packer. The organisation model for planning and realization functioned satisfactory and can be recommended for similar future projects. 9 refs, numerous tabs and figs.

  8. Deep drilling KLX 02. Drilling and documentation of a 1700 m deep borehole at Laxemar, Sweden

    International Nuclear Information System (INIS)

    Andersson, O.

    1994-08-01

    In this report the preparation and execution of the deep core drilling KLX 02 is described. The hole was drilled with the wireline methods, NQ dimension (diameter 76 mm), to a final depth of 1700.5 m. Prior to core drilling a diameter 215 mm pilot hole was pre drilled to 200 m with controlled hammer drilling (DTH). In this hole casing and air-lift equipment was installed with the aim to support the circulation of drilling fluid. During core drilling there was a measurement of major drilling parameters and drilling fluid in and out of hole. As a fluid tracer uranine was used. Each 300 m of core drilling air-lift pump tests were performed. After completion a flow-meter log was run to finalize the project phase. It can be concluded that both the pre drilling and core drilling methods used proved to be successful. No severe technical problem occurred. However, potential risks have been pointed at in the report. The air-lift system functioned only partly and has to be modified for further use. Also the technique for monitoring of drilling parameters needs improvement as does the method for air-lift pump tests with packer. The organisation model for planning and realization functioned satisfactory and can be recommended for similar future projects. 9 refs, numerous tabs and figs

  9. Metal Forming With a Magnetomotive Hammer

    Science.gov (United States)

    2004-01-01

    During the Apollo era Marshall Space Flight Center's engineers developed the Magnetomotive Hammer to remove distortions from Saturn V bulkhead gore segments. Using an intense magnetic field, the Hammer removed manufacturing distortions from rejected segments which otherwise would have been discarded at a cost of $30,000 each. Various automobile, ship and aircraft manufacturers adoped the technology for commercial use.

  10. Estimation of the effectiveness of the destruction of natural stone oversized by a hydraulic hammer

    Directory of Open Access Journals (Sweden)

    V.G. Kravets

    2017-12-01

    Full Text Available The experience of mining operations shows that even with the application of progressive methods of drilling, it is impossible to completely exclude the output of a large fraction (oversized. The percentage of oversized mass emissions from the blasting mass depending on the mining and geological conditions may vary from 5 to 20 percent. Catching an oversized piece into the receiving slit of the main crusher is associated with stopping the whole technological chain of the enterprise. Sharpening of oversized pieces of the work area during conducting of extraction or overturning works leads to a decrease in the efficiency of mining operations. Crushing of oversized materials to the required sizes can be carried out in an explosive way (by a bore or overhead charge or by non-explosive methods, most of which are based on mechanical destruction under the action of local dynamic stresses that cause stress exceeding the resistance of internal bonds in the rock. To date, manufacturers are offered many types of shock mechanisms, based on the transformation of various types of energy (from gravitational, to the energy of chemical processes into mechanical. For a number of reasons, mostly economic, to date, the most common way is the mechanical method of the destruction of oversized beams using hydraulic and hydro pneumatic hammer. That is why the work considers the main factors influencing the performance of the hydraulic hammer, among which – the specific energy consumption of the oversize and the main parameters of the hydraulic engine passport on the basis of the excavator. In the publication the power law of the hydraulic hammer changes in dependence of the size of the oversized. Also, the basic parameters of the JCB JS235 HD excavator passport are defined in the work with the use of the INDECO HP 1500 hammer hammer.

  11. HammerCloud: A Stress Testing System for Distributed Analysis

    International Nuclear Information System (INIS)

    Ster, Daniel C van der; García, Mario Úbeda; Paladin, Massimo; Elmsheuser, Johannes

    2011-01-01

    Distributed analysis of LHC data is an I/O-intensive activity which places large demands on the internal network, storage, and local disks at remote computing facilities. Commissioning and maintaining a site to provide an efficient distributed analysis service is therefore a challenge which can be aided by tools to help evaluate a variety of infrastructure designs and configurations. HammerCloud is one such tool; it is a stress testing service which is used by central operations teams, regional coordinators, and local site admins to (a) submit arbitrary number of analysis jobs to a number of sites, (b) maintain at a steady-state a predefined number of jobs running at the sites under test, (c) produce web-based reports summarizing the efficiency and performance of the sites under test, and (d) present a web-interface for historical test results to both evaluate progress and compare sites. HammerCloud was built around the distributed analysis framework Ganga, exploiting its API for grid job management. HammerCloud has been employed by the ATLAS experiment for continuous testing of many sites worldwide, and also during large scale computing challenges such as STEP'09 and UAT'09, where the scale of the tests exceeded 10,000 concurrently running and 1,000,000 total jobs over multi-day periods. In addition, HammerCloud is being adopted by the CMS experiment; the plugin structure of HammerCloud allows the execution of CMS jobs using their official tool (CRAB).

  12. Recurrent Hypothenar Hammer Syndrome: A Case Report.

    Science.gov (United States)

    Adams, Nicholas S; Ford, Ronald D

    2016-10-01

    Hypothenar hammer syndrome (HHS) is a rare cause of digital ischemia and pain caused from repetitive trauma to the palm. Often related to occupational practices, thrombosis and embolization can occur. Treatment is often surgical and involves excision with or without reconstruction. We describe a 55 year-old, male pipe fitter previously diagnosed and treated for HHS with excision and repair using a reversed interpositional vein graft in the mid-1980's. He continued to work in the profession, which he regularly used his palm as a hammer and returned approximately 30 years later with recurrent symptoms of cold intolerance and pain. Angiography confirmed occlusion of the ulnar artery with emboli present distally. The patient was again treated with excision and reconstruction. HHS is an uncommon cause of digital ischemia. Its recurrence is even more rare. To our knowledge, this is the first described case of diagnosed and treated recurrent HHS.

  13. Value-impact analysis for USI A-1, water hammer

    International Nuclear Information System (INIS)

    Serkiz, A.W.

    1983-05-01

    The Unresolved Safety Issue (USI) A-1 deals with safety concerns related to water hammer occurrence in nucler power plants. The staff's concerns were prompted by the increasing frequency of water hammer occurrence in the mid-1970's as new plants were coming on line, and in particular, by the feedwater line rupture at Indian Point No. 2 in 1973 (attributed to water hammer induced by steam-void collapse). Principal concerns were: the potential for inadequate dynamic load design, disablement of safety systems, and the release of radioactivity. The staff's views were set forth in NUREG-0582 and water hammer was designated a USI in 1979

  14. Regulatory analysis for USI A-1, Water Hammer

    International Nuclear Information System (INIS)

    Serkiz, A.W.

    1984-03-01

    This is the staff's regulatory analysis dealing with the resolution of the Unresolved Safety Issue A-1, Water Hammer. This report contains the value-impact analysis for this issue, public comments received, and staff response, or action taken, in response to those comments. The staff's technical findings regarding water hammer in nuclear power plants are contained in NUREG-0927

  15. Analysis of the drilling sound component from expert performance in a maxillo-facial surgery

    DEFF Research Database (Denmark)

    Hoffmann, Pablo F.; Gosselin, Florian; Taha, Farid

    2009-01-01

    Auditory displays can have a great potential in surgical simulators that aim at training skills associated to the correct interpretation of auditory information. Here, we present preliminary results in the analysis of the sound produced by the drilling procedure in a maxillo-facial surgery when...... performed by expert surgeons. The motivation of this work is to find relevant acoustic parameters that allow for an efficient synthesis method of auditory displays so that they can effectively convey information on expert surgical drilling....

  16. Water-hammer prevention, mitigation, and accommodation: a perspective

    International Nuclear Information System (INIS)

    Kim, J.H.

    1987-01-01

    The purpose of this paper is to present an industry perspective on water hammer, revisit the issues, and renew interest in this area with aim to prevent, mitigate, and accommodate water hammer. Water hammer keeps recurring in nuclear power plants and damages plant components and impacts on plant operations and availability through forced outages of plants. The implication is that water hammer in nuclear power plants still needs attention and is a problem that has not been fundamentally resolved. The paper displays statistics of the reported water hammer events between 1969 and 1985. The consequences of these water hammer events were: pipe support damage (hangers, anchors, and snubbers), 60%; component damage (piping, pumps, and valves), 17%; reactor trip, 10%; and plant shutdown, 7%. Reactor trips and plant shutdowns account for 17% of the event consequences. At the request of the nuclear utility industry, a workshop on water hammer was sponsored by the Electric Power Research Institute (EPRI), with cosponsorship from Northeast Utility Service Company, Yankee Atomic Electric Company, and Boston Edison Company, which drew some 90 specialists representing 28 utility companies as well as other nuclear industry, academia, and the NRC. The workshop recommendations are summarized

  17. Goal Translation for a Hammer for Coq (Extended Abstract

    Directory of Open Access Journals (Sweden)

    Łukasz Czajka

    2016-06-01

    Full Text Available Hammers are tools that provide general purpose automation for formal proof assistants. Despite the gaining popularity of the more advanced versions of type theory, there are no hammers for such systems. We present an extension of the various hammer components to type theory: (i a translation of a significant part of the Coq logic into the format of automated proof systems; (ii a proof reconstruction mechanism based on a Ben-Yelles-type algorithm combined with limited rewriting, congruence closure and a first-order generalization of the left rules of Dyckhoff's system LJT.

  18. A simple measurement hammer for quantitative reflex studies

    NARCIS (Netherlands)

    Stam, J.; van Leeuwen, J. R.

    1984-01-01

    A reflex hammer for measurement of the mechanical stimulus strength was designed. Combined with standard EMG equipment this instrument permits the study of both stimulus-response relations and latencies of myotatic reflexes. Some results in normal subjects are discussed

  19. A Hammer-Impact, Aluminum, Shear-Wave Seismic Source

    Science.gov (United States)

    Haines, Seth

    2007-01-01

    Near-surface seismic surveys often employ hammer impacts to create seismic energy. Shear-wave surveys using horizontally polarized waves require horizontal hammer impacts against a rigid object (the source) that is coupled to the ground surface. I have designed, built, and tested a source made out of aluminum and equipped with spikes to improve coupling. The source is effective in a variety of settings, and it is relatively simple and inexpensive to build.

  20. Reduced-impact sliding pressure control valve for pneumatic hammer drill

    Science.gov (United States)

    Polsky, Yarom [Oak Ridge, TN; Grubelich, Mark C [Albuquerque, NM; Vaughn, Mark R [Albuquerque, NM

    2012-05-15

    A method and means of minimizing the effect of elastic valve recoil in impact applications, such as percussive drilling, where sliding spool valves used inside the percussive device are subject to poor positioning control due to elastic recoil effects experienced when the valve impacts a stroke limiting surface. The improved valve design reduces the reflected velocity of the valve by using either an energy damping material, or a valve assembly with internal damping built-in, to dissipate the compression stress wave produced during impact.

  1. A Long-Term Performance Enhancement Method for FOG-Based Measurement While Drilling.

    Science.gov (United States)

    Zhang, Chunxi; Lin, Tie

    2016-07-28

    In the oil industry, the measurement-while-drilling (MWD) systems are usually used to provide the real-time position and orientation of the bottom hole assembly (BHA) during drilling. However, the present MWD systems based on magnetic surveying technology can barely ensure good performance because of magnetic interference phenomena. In this paper, a MWD surveying system based on a fiber optic gyroscope (FOG) was developed to replace the magnetic surveying system. To accommodate the size of the downhole drilling conditions, a new design method is adopted. In order to realize long-term and high position precision and orientation surveying, an integrated surveying algorithm is proposed based on inertial navigation system (INS) and drilling features. In addition, the FOG-based MWD error model is built and the drilling features are analyzed. The state-space system model and the observation updates model of the Kalman filter are built. To validate the availability and utility of the algorithm, the semi-physical simulation is conducted under laboratory conditions. The results comparison with the traditional algorithms show that the errors were suppressed and the measurement precision of the proposed algorithm is better than the traditional ones. In addition, the proposed method uses a lot less time than the zero velocity update (ZUPT) method.

  2. Stable sonoluminescence within a water hammer tube.

    Science.gov (United States)

    Chakravarty, Avik; Georghiou, Theo; Phillipson, Tacye E; Walton, Alan J

    2004-06-01

    The sonoluminescence (SL) from the collapse of a single gas bubble within a liquid can be produced repetitively using an acoustic resonator. An alternative technique using a water hammer tube, producing SL from bubbles of greater size, is described here. A sealed vertical tube partly filled with a liquid and a gas at low pressure is subjected to vertical vibrations. The oscillation of the pressure within the liquid column, due to inertial forces, excites cavitation bubbles to grow and collapse. Rotation is used to confine the bubbles to the axis of the tube. Bright SL emissions were observed in a number of liquids. Repetitive emission was produced from bubbles in condensed phosphoric acid. Bubbles of 0.4 mm ambient radius (containing 2x 10(14) xenon atoms) were excited by vibration at 35 Hz. Approximately 10(12) photons were emitted per collapse in the range 400-700 nm (over four orders of magnitude greater than the brightest SL reported previously), corresponding to a 1% efficiency of the conversion of mechanical energy into light.

  3. Steam condensation induced water hammer in a vertical up-fill configuration within an integral test facility. Experiments and computational simulations

    Energy Technology Data Exchange (ETDEWEB)

    Dirndorfer, Stefan

    2017-01-17

    Condensation induced water hammer is a source of danger and unpredictable loads in pipe systems. Studies concerning condensation induced water hammer were predominantly made for horizontal pipes, studies concerning vertical pipe geometries are quite rare. This work presents a new integral test facility and an analysis of condensation induced water hammer in a vertical up-fill configuration. Thanks to the state of the art technology, the phenomenology of vertical condensation induced water hammer can be analysed by means of sufficient high-sampled experimental data. The system code ATHLET is used to simulate UniBw condensation induced water hammer experiments. A newly developed and implemented direct contact condensation model enables ATHLET to calculate condensation induced water hammer. Selected experiments are validated by the modified ATHLET system code. A sensitivity analysis in ATHLET, together with the experimental data, allows to assess the performance of ATHLET to compute condensation induced water hammer in a vertical up-fill configuration.

  4. Steam condensation induced water hammer in a vertical up-fill configuration within an integral test facility. Experiments and computational simulations

    International Nuclear Information System (INIS)

    Dirndorfer, Stefan

    2017-01-01

    Condensation induced water hammer is a source of danger and unpredictable loads in pipe systems. Studies concerning condensation induced water hammer were predominantly made for horizontal pipes, studies concerning vertical pipe geometries are quite rare. This work presents a new integral test facility and an analysis of condensation induced water hammer in a vertical up-fill configuration. Thanks to the state of the art technology, the phenomenology of vertical condensation induced water hammer can be analysed by means of sufficient high-sampled experimental data. The system code ATHLET is used to simulate UniBw condensation induced water hammer experiments. A newly developed and implemented direct contact condensation model enables ATHLET to calculate condensation induced water hammer. Selected experiments are validated by the modified ATHLET system code. A sensitivity analysis in ATHLET, together with the experimental data, allows to assess the performance of ATHLET to compute condensation induced water hammer in a vertical up-fill configuration.

  5. Muffling Hammer Blows In A Workshop

    Science.gov (United States)

    Thiele, Alfred W.; Gilbert, Jeffrey L.; Gutow, David A.

    1994-01-01

    Sound-deadening bags placed on hammered workpieces. Useful in many workshop situations. Fabricated easily and inexpensively. Bags filled with particles of sand, metal shot, plastic, or glass, then sewn or molded shut. Tailored to fit special configurations of some workpieces. Devices used to deaden print rollers and to reduce vibrations in main-injector inlet manifold of rocket engine.

  6. Development of a jet-assisted polycrystalline diamond drill bit

    Energy Technology Data Exchange (ETDEWEB)

    Pixton, D.S.; Hall, D.R.; Summers, D.A.; Gertsch, R.E.

    1997-12-31

    A preliminary investigation has been conducted to evaluate the technical feasibility and potential economic benefits of a new type of drill bit. This bit transmits both rotary and percussive drilling forces to the rock face, and augments this cutting action with high-pressure mud jets. Both the percussive drilling forces and the mud jets are generated down-hole by a mud-actuated hammer. Initial laboratory studies show that rate of penetration increases on the order of a factor of two over unaugmented rotary and/or percussive drilling rates are possible with jet-assistance.

  7. A Study of Specific Fracture Energy at Percussion Drilling

    Science.gov (United States)

    A, Shadrina; T, Kabanova; V, Krets; L, Saruev

    2014-08-01

    The paper presents experimental studies of rock failure provided by percussion drilling. Quantification and qualitative analysis were carried out to estimate critical values of rock failure depending on the hammer pre-impact velocity, types of drill bits and cylindrical hammer parameters (weight, length, diameter), and turn angle of a drill bit. Obtained data in this work were compared with obtained results by other researchers. The particle-size distribution in granite-cutting sludge was analyzed in this paper. Statistical approach (Spearmen's rank-order correlation, multiple regression analysis with dummy variables, Kruskal-Wallis nonparametric test) was used to analyze the drilling process. Experimental data will be useful for specialists engaged in simulation and illustration of rock failure.

  8. A Study of Specific Fracture Energy at Percussion Drilling

    International Nuclear Information System (INIS)

    Shadrina A; Krets V; Saruev L; Kabanova T

    2014-01-01

    The paper presents experimental studies of rock failure provided by percussion drilling. Quantification and qualitative analysis were carried out to estimate critical values of rock failure depending on the hammer pre-impact velocity, types of drill bits and cylindrical hammer parameters (weight, length, diameter), and turn angle of a drill bit. Obtained data in this work were compared with obtained results by other researchers. The particle-size distribution in granite-cutting sludge was analyzed in this paper. Statistical approach (Spearmen's rank-order correlation, multiple regression analysis with dummy variables, Kruskal-Wallis nonparametric test) was used to analyze the drilling process. Experimental data will be useful for specialists engaged in simulation and illustration of rock failure

  9. A new production technique for wear resistant ring-hammers

    Directory of Open Access Journals (Sweden)

    Li Shifeng

    2011-11-01

    Full Text Available Based on a great number of laboratory experiments, a new technique has been developed for producing wear resistant ring-hammers. In this technology, lost foam casting with iron sand was combined to make mold; a special alloy was used to inoculate the molten steel, and proper heat treatment was used to further improve mechanical properties of wear resistant ring-hammers. The influence of this new production technology on the microstructure and mechanical properties of wear resistant ring-hammers was studied. Results show that iron sand molding, having the inherent characteristic of sand molding, changes the type of metallic compounds, refines crystal grains and increases the fineness of microstructure. Practical experience verified that the properties of the ring-hammers produced with this new technique are as follows: tensile strength (Rm 720 MPa, impact toughness (ak > 210 J•cm-2 and hardness > 200 HB. After water quenching from 1,080℃ (holding for 4 h and tempering at 320℃ for 3 h, the best wear resistance is obtained, and the wear resistance is 1.6 times higher than that of common high manganese ring-hammers.

  10. Performance of engine-driven rotary endodontic instruments with a superimposed bending deflection: V. Gates Glidden and Peeso drills.

    Science.gov (United States)

    Brantley, W A; Luebke, N H; Luebke, F L; Mitchell, J C

    1994-05-01

    A laboratory study was performed on Gates Glidden and Peeso drills to determine the incidence of shaft fracture when a bending deflection was superimposed on the rotating drills. Samples of sizes #1 to #6 stainless steel Gates Glidden drills, sizes #1 to #6 stainless steel and carbon steel-type P Peeso drills, and sizes #009 to #023 carbon steel-type B-1 Peeso drills from each of two manufacturers were evaluated with a unique apparatus that applied a 2-mm bending deflection while rotating the instruments. The apparatus did not restrict movement of the bur head during rotation. The test drills were rotated at 2500, 4000, and 7000 revolutions per minute, and the number of revolutions at failure was recorded. Scanning electron microscopic observations established that the stainless steel Gates Glidden and Peeso drills failed by ductile fracture, whereas the carbon steel Peeso drills failed by brittle fracture. Instrument fracture was always near the handpiece shank with this test, and the length of the fractured drills was measured from the working tip. It is recommended that this additional test be adopted to determine fatigue properties of engine-driven rotary endodontic instruments in establishing international performance standards.

  11. The Auto-Gopher Deep Drill

    Science.gov (United States)

    Badescu, Mircea

    2014-01-01

    Subsurface penetration by coring, drilling or abrading is of great importance for a large number of space and earth applications. An Ultrasonic/Sonic Drill/Corer (USDC) has been in development at JPL's Nondestructive Evaluation and Advanced Actuators (NDEAA) lab as an adaptable tool for many of these applications. The USDC uses a novel drive mechanism to transform the high frequency ultrasonic or sonic vibrations of the tip of a horn into a lower frequency sonic hammering of a drill bit through an intermediate free-flying mass. The USDC device idea has been implemented at various scales from handheld drills to large diameter coring devices. A series of computer programs that model the function and performance of the USDC device were developed and were later integrated into an automated modeling package. The USDC has also evolved from a purely hammering drill to a rotary hammer drill as the design requirements increased form small diameter shallow drilling to large diameter deep coring. A synthesis of the Auto-Gopher development is presented in this paper.

  12. Water hammer

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The overall NRC program for the resolution of the water hammer issue is divided into four tasks: water hammer summary reports; revision of CP and OL review procedures; water hammer positions for operating reactors; and water hammer safety studies

  13. Condensate induced water hammer in a steam distribution system results in fatality

    International Nuclear Information System (INIS)

    Debban, H.L.; Eyre, L.E.

    1996-02-01

    Water hammer event s in steam distribution piping interrupt service and have the potential to cause serious injury and property damage. Conditions of condensation induced water hammer are discussed and recommendations aimed to improve safety of steam systems are presented. Condensate induced water hammer events at Hanford, a DOE facility, are examined

  14. HAMOC: a computer program for fluid hammer analysis

    International Nuclear Information System (INIS)

    Johnson, H.G.

    1975-12-01

    A computer program has been developed for fluid hammer analysis of piping systems attached to a vessel which has undergone a known rapid pressure transient. The program is based on the characteristics method for solution of the partial differential equations of motion and continuity. Column separation logic is included for situations in which pressures fall to saturation values

  15. Water hammer with column separation : a historical review

    NARCIS (Netherlands)

    Bergant, A.; Simpson, A.R.; Tijsseling, A.S.

    2006-01-01

    Column separation refers to the breaking of liquid columns in fully filled pipelines. This may occur in a water-hammer event when the pressure in a pipeline drops to the vapor pressure at specific locations such as closed ends, high points or knees (changes in pipe slope). The liquid columns are

  16. Ulnar hammer syndrome: a systematic review of the literature.

    Science.gov (United States)

    Vartija, Larisa; Cheung, Kevin; Kaur, Manraj; Coroneos, Christopher James; Thoma, Achilleas

    2013-11-01

    Ulnar hammer syndrome is an uncommon form of arterial insufficiency. Many treatments have been described, and debate continues about the best option. The goal of this systematic review was to determine whether ulnar hammer syndrome has an occupational association, to identify the most reliable diagnostic test, and to determine the best treatment modality. A comprehensive literature search was conducted using the Cochrane Database of Systematic Reviews, the Cochrane Central Register of Controlled Trials, MEDLINE, CINAHL, and EMBASE. Data from articles meeting inclusion criteria were collected in duplicate. Methodological quality of studies was assessed using the Methodological Index for Nonrandomized Studies scale. Thirty studies were included in the systematic review. No randomized controlled trials were identified. There is low-quality evidence suggestive of an association between exposure to repetitive hand trauma and vibration and ulnar hammer syndrome. Various diagnostic investigations were used, but few were compared, making it difficult to determine the most reliable diagnostic test. Numerous nonoperative and operative treatments were reported. With nonoperative treatment, 12 percent had complete resolution and 70 percent had partial resolution of their symptoms. Of patients treated operatively, 42.5 percent had complete resolution and 42.5 percent had partial resolution of their symptoms. The heterogeneity in study design and outcome measures limits definitive conclusions about occupational association, best diagnostic test, and treatment for ulnar hammer syndrome. However, there is low-quality evidence that suggests that most patients with ulnar hammer syndrome will have partial relief of symptoms with nonoperative treatment, and operative treatment results in complete or partial resolution of symptoms in the majority of cases. Therapeutic, IV.

  17. Cavitation luminescence in a water hammer: Upscaling sonoluminescence

    Science.gov (United States)

    Su, C.-K.; Camara, C.; Kappus, B.; Putterman, S. J.

    2003-06-01

    Oscillatory acceleration and deceleration of a column of water leads to a pipe hammer as well as cavitation. With a small amount of xenon gas dissolved in the water, we can detect a stream of predominantly ultraviolet subnanosecond flashes of light which are attributed to collapsing bubbles. The observed emission can exceed 108 photons for a single collapse and has a peak power over 0.4 W.

  18. A vision for drilling

    Energy Technology Data Exchange (ETDEWEB)

    Millheim, K. [Montanuniversitaet Leoben (Austria)

    1995-12-31

    The future of drilling lies in its relationship with the oil and gas industry. This paper examines how the future of drilling is seen from the view point of the exploration manager, the drilling contractor, the drilling engineer and the company president or managing director. The various pressures on the oil and gas industry are examined, such as environmental issues, alternative energy sources, and the price of oil which determines how companies are run. Exploration activity is driven by the price of oil and gas. The development of wells with multiple horizontal wells or multiple horizontal wells with tributaries will reduce the cost of exploration. Companies will rely less and less on reservoir simulation and more on cheap well-bores, multi-lateral well-bores and will exploit oil that could not be exploited before. The cost of exploratory drilling will need to be kept down so that in the future the industry will get better at economically finding fields at the 10 million to 20 million barrel range that would not have been possible before. The future is expected to see drilling contractors tunnelling, making sewerage lines and drilling 10,000 foot wells with purpose built rigs. Franchising will become a feature of the industry as will the use of databases to answer key technical questions. Offshore platforms will be built to be moveable and disposable. The industry is capable of solving problems, meeting challenges and making ideas work, providing much hope for the future. 10 figs., 1 photo.

  19. Water hammer analysis in a water distribution system

    Directory of Open Access Journals (Sweden)

    John Twyman

    2017-04-01

    Full Text Available The solution to water hammer in a water distribution system (WDS is shown by applying three hybrid methods (HM based on the Box’s scheme, McCormack's method and Diffusive Scheme. Each HM formulation in conjunction with their relative advantages and disadvantages are reviewed. The analyzed WDS has pipes with different lengths, diameters and wave speeds, being the Courant number different in each pipe according to the adopted discretization. The HM results are compared with the results obtained by the Method of Characteristics (MOC. In reviewing the numerical attenuation, second order schemes based on Box and McCormack are more conservative from a numerical point of view, being recommendable their application in the analysis of water hammer in water distribution systems.

  20. A study of water hammer phenomena in a one-component two-phase bubbly flow

    International Nuclear Information System (INIS)

    Fujii, Terushige; Akagawa, Koji

    2000-01-01

    Water hammer phenomena caused by a rapid valve closure, that is, shock phenomena in two-phase flows, are an important problem for the safety assessment of a hypothetical LOCA. This paper presents the results of experimental and analytical studies of the water hammer phenomena in a one-component tow-phase bubbly flow. In order to clarify the characteristics of water hammer phenomena, experiments for a one-component two-phase flow of Freon R-113 were conducted and a numerical simulation of pressure transients was developed. An overall picture of the water hammer phenomena in a one-component two-phase flow is presented an discussed. (author)

  1. Management of Hypothenar Hammer Syndrome A Case Report.

    Science.gov (United States)

    Swofford, Brenen P; Swofford, Devon P

    2018-02-09

    BACKGROUND Hypothenar hammer syndrome is a relatively rare disease process caused by repetitive stress or injury to the hypothenar eminence leading to chronic injury to the ulnar artery. This chronic stress (usually as a result of occupational or sport activities) may result in arterial constriction or thickening, which may lead to thrombosis or aneurysm formation. A review of current literature revealed that reports related to management of hypothenar hammer syndrome are limited. CASE REPORT A 33-year-old male without significant past medical history presented with left hand/digit pain, skin discoloration, and coolness of the hand/digits after a mechanical accident experienced 12 hours prior to presentation. Angiography confirmed reduced flow in the ulnar and radial artery with significant spasm of the ulnar artery. Treatment consisted of heparin, nitroglycerin, and papaverine with rapid resolution of symptoms. The patient was discharged on anticoagulation and a calcium channel blocker, with scheduled follow-up. CONCLUSIONS Hypothenar hammer syndrome is a rare disease process which manifests in certain occupations and activities that put undue stress on the hypothenar area. The use of angiography for definitive diagnosis and the use of anticoagulation and calcium channel blockers for treatment should continue to be studied to determine a standard treatment regimen.

  2. A body is not a metaphor: Barbara Hammer's X-ray vision.

    Science.gov (United States)

    Osterweil, Ara

    2010-01-01

    This article examines three films by legendary experimental filmmaker Barbara Hammer that deal with the sick, aging, or dying body: Optic Nerve (1985), Sanctus (1990), and A Horse is Not a Metaphor (2008). By analyzing films that do not explicitly confront sexual identity, this article questions the continuing usefulness of the designation "lesbian filmmaker" when considering Hammer's diverse body of work. Tracing the "double consciousness" through which Hammer approaches the body and its construction in patriarchy-particularly in the discourse of medicine-this article argues that Hammer's is a thoroughly corporeal, but not exclusively lesbian, cinema.

  3. HammerCloud: A Stress Testing System for Distributed Analysis

    CERN Document Server

    van der Ster, Daniel C; Ubeda Garcia, Mario; Paladin, Massimo

    2011-01-01

    Distributed analysis of LHC data is an I/O-intensive activity which places large demands on the internal network, storage, and local disks at remote computing facilities. Commissioning and maintaining a site to provide an efficient distributed analysis service is therefore a challenge which can be aided by tools to help evaluate a variety of infrastructure designs and configurations. HammerCloud (HC) is one such tool; it is a stress testing service which is used by central operations teams, regional coordinators, and local site admins to (a) submit arbitrary number of analysis jobs to a number of sites, (b) maintain at a steady-state a predefined number of jobs running at the sites under test, (c) produce web-based reports summarizing the efficiency and performance of the sites under test, and (d) present a web-interface for historical test results to both evaluate progress and compare sites. HC was built around the distributed analysis framework Ganga, exploiting its API for grid job management. HC has been ...

  4. Water hammer research in networks

    OpenAIRE

    Anželika Jurkienė; Mindaugas Rimeika

    2015-01-01

    Formation of water hammer, its consequences and possible protection measures are rarely topics, however the problem is significant. Water hammer can form in water supply and pressurized sewage networks, for various reasons. The article presents short theory of water hammer and methodology for calculation of specific parameters. Research of water hammer was performed in real water supply and sewer networks of country. Simulation of water hammer was carried out by turning on and off water pumps...

  5. Electromagnetic Hammer for Metalworking

    Science.gov (United States)

    Anderson, S. A.; Brunet, F.; Dowd, A.; Durham, R.; Ezell, J.; Gorr, G.; Hartley, D.; Jackson, F.; Marchand, J.; Macfarlane, W.; hide

    1986-01-01

    High eddy currents apply pressure for cold-forming. Coil housing constructed for mechanical strength to hold coil against magnetic force, to maintain electrical contact with coil ends, and to maintain insulation between coil turns. Drilled holes placed to facilitate release of bubbles during potting. In contrast with mechanical hammers, electromagnetic hammer requires no dynamic material contact with workpiece; consequently, produces almost no change in metal grain structure.

  6. Proximal forearm extensor muscle strain is reduced when driving nails using a shock-controlled hammer.

    Science.gov (United States)

    Buchanan, Kimberly A; Maza, Maria; Pérez-Vázquez, Carlos E; Yen, Thomas Y; Kijowski, Richard; Liu, Fang; Radwin, Robert G

    2016-10-01

    Repetitive hammer use has been associated with strain and musculoskeletal injuries. This study investigated if using a shock-control hammer reduces forearm muscle strain by observing adverse physiological responses (i.e. inflammation and localized edema) after use. Three matched framing hammers were studied, including a wood-handle, steel-handle, and shock-control hammer. Fifty volunteers were randomly assigned to use one of these hammers at a fatiguing pace of one strike every second, to seat 20 nails in a wood beam. Magnetic resonance imaging was used to scan the forearm muscles for inflammation before the task, immediately after hammering, and one to two days after. Electromyogram signals were measured to estimate grip exertions and localized muscle fatigue. High-speed video was used to calculate the energy of nail strikes. While estimated grip force was similar across the three hammers, the shock-control hammer had 40% greater kinetic energy upon impact and markedly less proximal extensor muscle edema than the wood-handle and steel-handle hammers, immediately after use (phandle shock can mitigate strain in proximal forearm extensor muscles. Copyright © 2016 Elsevier Ltd. All rights reserved.

  7. Effects of a Short Drilling Implant Protocol on Osteotomy Site Temperature and Drill Torque.

    Science.gov (United States)

    Mihali, Sorin G; Canjau, Silvana; Cernescu, Anghel; Bortun, Cristina M; Wang, Hom-Lay; Bratu, Emanuel

    2018-02-01

    To establish a protocol for reducing the drilling sequence during implant site preparation based on temperature and insertion torque. The traditional conventional drilling sequence (used several drills with 0.6-mm increment each time) was compared with the proposed short drilling protocol (only used 2 drills: initial and final drill). One hundred drilling osteotomies were performed in bovine and porcine bones. Sets of 2 osteotomy sites were created in 5 bone densities using 2 types of drilling protocols. Thermographic pictures were captured throughout all drilling procedures and analyzed using ThermaCAM Researcher Professional 2.10. Torque values were determined during drilling by measuring electrical input and drill speed. There were statistically significant differences in bone temperature between the conventional and short drilling protocols during implant site preparation (analysis of variance P = 0.0008). However, there were no significant differences between the 2 types of drilling protocols for both implant diameters. Implant site preparation time was significantly reduced when using the short drilling protocol compared with the conventional drilling protocol (P drilling protocol proposed herein may represent a safe approach for implant site preparation.

  8. Improving milling and production of a dust-producing unit equipped with hammer mills

    Energy Technology Data Exchange (ETDEWEB)

    Vorotnikov, Ye.G.; Nikiforov, A.A.; Rasputin, O.V.; Sukhunin, V.I.

    1982-01-01

    This paper presents generalized experience for deriving coarse ground coal dust in hammer mills by providing comparison data on improving efficiency of operation of the unit when switching to a coarser-type grind of the fuel. Need to have more precise formulas to calculate grinding potential of hammer mills when using a coarser grind is shown.

  9. Ex Vivo Evaluation of Cementless Acetabular Cup Stability Using Impact Analyses with a Hammer Instrumented with Strain Sensors.

    Science.gov (United States)

    Tijou, Antoine; Rosi, Giuseppe; Hernigou, Philippe; Flouzat-Lachaniette, Charles-Henri; Haïat, Guillaume

    2017-12-27

    The acetabular cup (AC) implant stability is determinant for the success of cementless hip arthroplasty. A method based on the analysis of the impact force applied during the press-fit insertion of the AC implant using a hammer instrumented with a force sensor was developed to assess the AC implant stability. The aim of the present study was to investigate the performance of a method using a hammer equipped with strain sensors to retrieve the AC implant stability. Different AC implants were inserted in five bovine samples with different stability conditions leading to 57 configurations. The AC implant was impacted 16 times by the two hammers consecutively. For each impact; an indicator I S (respectively I F ) determined by analyzing the time variation of the signal corresponding to the averaged strain (respectively force) obtained with the stress (respectively strain) hammer was calculated. The pull-out force F was measured for each configuration. F was significantly correlated with I S (R² = 0.79) and I F (R² = 0.80). The present method has the advantage of not modifying the shape of the hammer that can be sterilized easily. This study opens new paths towards the development of a decision support system to assess the AC implant stability.

  10. Muscle fibre type composition and body composition in hammer throwers.

    Science.gov (United States)

    Terzis, Gerasimos; Spengos, Konstantinos; Kavouras, Stavros; Manta, Panagiota; Georgiadis, Giorgos

    2010-01-01

    Aim of the present study was to describe the muscle fibre type composition and body composition of well-trained hammer throwers. Six experienced hammer throwers underwent the following measurements: one repetition maximum in squat, snatch, and clean, standing broad jump, backward overhead shot throw and the hammer throw. Dual x-ray absorptiometry was used for body composition analysis. Fibre type composition and cross sectional area was determined in muscle biopsy samples of the right vastus lateralis. Eight physical education students served as a control group. One repetition maximum in squat, snatch and clean for the hammer throwers was 245 ± 21, 132 ± 13 and 165 ± 12kg, respectively. Lean body mass was higher in hammer throwers (85.9 ± 3. 9kg vs. 62.7 ± 5.1kg (p hammer throwers and 51 ± 8% in the control group (p Hammer throwers had significantly larger type IIA fibres (7703 ± 1171 vs. 5676 ± 1270μm(2), p Hammer throwing performance correlated significantly with lean body mass (r = 0.81, p hammer throwers have larger lean body mass and larger muscular areas occupied by type II fibres, compared with relatively untrained subjects. Moreover, it seems that the enlarged muscle mass of the hammer throwers contributes significantly to the hammer throwing performance. Key pointsWell-trained hammer throwers had increased lean body mass, higher type IIA muscle fibres cross sectional areas, as well as higher bone mineral density, compared to controls.Increased lean body mass was closely related with hammer throwing performance.The relative high percentage of type IIX muscle fibres in vastus lateralis in hammer throwers warrants further investigation.

  11. A different challenge: the directional drilled crossing for the Yacuiba - Rio Grande Gas Line Project - GASYRG

    Energy Technology Data Exchange (ETDEWEB)

    Green, Wayne; Garcia, Francisco [Bolinter Ltda., Santa Cruz (Bolivia); Montano, Ruben [Transierra, Santa Cruz (Bolivia)

    2003-07-01

    The Rio Grande River's directional drilling, 2002 m. long and 25 m. deep was a great challenge for Transierra - Owner - as well as Laney - Bolinter - Contractor - to accomplish a feat yet to be done in the entire world. The dedication of the people involved showed their degree of professionalism that these companies have obtained and the determination in doing the job overcoming unforeseen obstacles and still being able to finish on time, mitigating environmental impacts and leaving a first class crossing. This document presents a description of the technical, logistic and construction factors that were involved in the project and which allowed to perform 7 directional drillings, including Rio Grande River, which during the pull got the last 60 m. of pipe stuck, being freed only after using a pneumatic hammer. (author)

  12. Testing as a service with HammerCloud

    International Nuclear Information System (INIS)

    Llamas, Ramón Medrano; Barrand, Quentin; Sciabà, Andrea; Ster, Daniel van der; Elmsheuser, Johannes; Legger, Federica; Sciacca, Gianfranco

    2014-01-01

    HammerCloud was designed and born under the needs of the grid community to test the resources and automate operations from a user perspective. The recent developments in the IT space propose a shift to the software defined data centres, in which every layer of the infrastructure can be offered as a service. Testing and monitoring is an integral part of the development, validation and operations of big systems, like the grid. This area is not escaping the paradigm shift and we are starting to perceive as natural the Testing as a Service (TaaS) offerings, which allow testing any infrastructure service, such as the Infrastructure as a Service (IaaS) platforms being deployed in many grid sites, both from the functional and stressing perspectives. This work will review the recent developments in HammerCloud and its evolution to a TaaS conception, in particular its deployment on the Agile Infrastructure platform at CERN and the testing of many IaaS providers across Europe in the context of experiment requirements. The first section will review the architectural changes that a service running in the cloud needs, such an orchestration service or new storage requirements in order to provide functional and stress testing. The second section will review the first tests of infrastructure providers on the perspective of the challenges discovered from the architectural point of view. Finally, the third section will evaluate future requirements of scalability and features to increase testing productivity.

  13. Prey selection of a captive Oystercatcher Haematopus ostralegus hammering Mussels Mytilus edulis from the ventral side

    NARCIS (Netherlands)

    Ens, Bruno J.; Alting, D

    1996-01-01

    We studied prey choice of a captive Oystercatcher:hat hammered Mussels from the ventral side. The results replicate previous findings that ventral hammerers select Mussels of intermediate size, select against thick-shelled Mussels, abandon an increasing proportion of Mussels with increasing size and

  14. Testing as a Service with HammerCloud

    CERN Document Server

    Medrano Llamas, Ramón; Elmsheuser, Johannes; Legger, Federica; Sciacca, Gianfranco; Sciabà, Andrea; van der Ster, Daniel

    2014-01-01

    HammerCloud was designed and born under the needs of the grid community to test the resources and automate operations from a user perspective. The recent developments in the IT space propose a shift to the software defined data centres, in which every layer of the infrastructure can be offered as a service. Testing and monitoring is an integral part of the development, validation and operations of big systems, like the grid. This area is not escaping the paradigm shift and we are starting to perceive as natural the Testing as a Service (TaaS) offerings, which allow testing any infrastructure service, such as the Infrastructure as a Service (IaaS) platforms being deployed in many grid sites, both from the functional and stressing perspectives. This work will review the recent developments in HammerCloud and its evolution to a TaaS conception, in particular its deployment on the Agile Infrastructure platform at CERN and the testing of many IaaS providers across Europe in the context of experiment requirements....

  15. UO2-PuO2 critical experiments based on a coupled NJOY/AMPX-II/HAMMER-TECHNION system

    International Nuclear Information System (INIS)

    Fernandes, M.A.R.

    1990-01-01

    The performance of the HAMMER-TECHNION system in the criticality analysis of mixed oxide (UO sub(2)-PuO sub(2)) fuel pins clad with Zircaloy-2 and having light water as moderator was analyzed in this work. The basic nuclear data libraries for the HAMMER-TECHNION have been generated by processing the ENDF/B-IV and JENDL-2 nuclear data files with the NJOY system. The question of the effect of Plutonium resonances close to the thermal region on the average thermal parameters was addressed by creating a special version of the HAMMER-TECHNION system with the thermal energy cut-off at 1.855 eV. The final system effective multiplication factor was calculated with the CITATION code by using the homogeneized four-group cross sections generated by the HAMMER-TECHNION system. Results are shown for the original HAMMER-TECHNION thermal cut-off and for the one at 1.855 eV. Besides that, for some selected critical systems, the effect of the resonance interference among the resonances of the Uranium and Plutonium isotopes was addressed by using the ROLAIDS module of the AMPX-II system. The effect of the thermal energy cut-off on the integral parameters of the critical systems was not found to be of extreme importance. (author)

  16. The significance of water hammer events to public dose from reactor accidents: A probabilistic assessment

    International Nuclear Information System (INIS)

    Amico, P.J.; Ferrell, W.L.; Rubin, M.P.

    1984-01-01

    A probabilistic assessment was made of the effects on public dose of water hammer events in LWRs. The analysis utilized actual historical water hammer data to determine if the water hammer events contributed either to system failure rates or initiating event frequencies. Representative PRAs were used to see if changes in initiating events and/or system failures caused by water hammer resulted in new values for the dominant sequences in the PRAs. New core melt frequencies were determined and carried out to the subsequent increase in public dose. It is concluded that water hammer is not a significant problem with respect to risk to the public for either BWRs or PWRs. (orig./HP)

  17. Evaluation of water-hammer experience in nuclear power plants. Technical findings relevant to Unresolved Safety Issue A-1

    International Nuclear Information System (INIS)

    Serkiz, A.W.

    1983-05-01

    This report summarizes key technical findings relevant to the Unresolved Safety Issue A-1, Water Hammer. These findings were derived from studies of reported water hammer occurrences and underlying causes and provide key insights into means to minimize or eliminate further water hammer occurrences. It should also be noted that this report does not represent a substitute for current rules and regulations

  18. Evaluation of water hammer occurrence in nuclear power plants: technical findings relevant to unresolved safety issue A-1

    International Nuclear Information System (INIS)

    1984-03-01

    This report, which includes responses to public comments, summarizes key technical findings relevant to the Unresolved Safety Issue A-1, Water Hammer. These findings were derived from studies of reported water hammer occurrences and underlying causes and provide key insights into means to minimize or eliminate further water hammer occurrences. This report does not represent a substitute for current rules and regulations

  19. Drilling Performance of Rock Drill by High-Pressure Water Jet under Different Configuration Modes

    Directory of Open Access Journals (Sweden)

    Songyong Liu

    2017-01-01

    Full Text Available In the rock drilling progress, the resistant force results in tools failure and the low drilling efficiency; thus, it is necessary to reduce the tools failure and enhance the drilling efficiency. In this paper, different configuration modes of drilling performance assisted with water jet are explored based on the mechanism and experiment analysis of rock drilling assisted with water jet. Moreover, the rotary sealing device with high pressure is designed to achieve the axial and rotation movement simultaneously as well as good sealing effect under high-pressure water jet. The results indicate that the NDB and NFB have better effects on drilling performance compared with that of NSB. Moreover, the high-pressure water jet is helpful not only to reduce the drill rod deflection, but also to reduce the probability of drill rod bending and improve the drill rod service life.

  20. Water hammer research in networks

    Directory of Open Access Journals (Sweden)

    Anželika Jurkienė

    2015-10-01

    Full Text Available Formation of water hammer, its consequences and possible protection measures are rarely topics, however the problem is significant. Water hammer can form in water supply and pressurized sewage networks, for various reasons. The article presents short theory of water hammer and methodology for calculation of specific parameters. Research of water hammer was performed in real water supply and sewer networks of country. Simulation of water hammer was carried out by turning on and off water pumps in pumping station. Successful measurement of water hammer depends on accuracy of the measurement equipment, therefore during the research surge wave fluctuations were measured with especially high resolution pressure meters. Detailed analysis of water hammer and selection of protecting equipment hydraulic model of water supply network was created. Protection against water hammer helps to avoid breaking of the water network and extend operation time.

  1. Performance of palm oil as a biobased machining lubricant when drilling inconel 718

    Directory of Open Access Journals (Sweden)

    Abd Rahim Erween

    2017-01-01

    Full Text Available Metalworking fluid acts as cooling and lubrication agent at the cutting zone in the machining process. However, conventional Metalworking fluid such mineral oil gives negative impact on the human and environment. Therefore, the manufacture tends to substitute the mineral oil to bio-based oil such as vegetables and synthetic oil. In this paper, the drilling experiment was carried out to evaluate the efficiency of palm oil and compare it with minimal quantity lubrication technique using synthetic ester, flood coolant and air blow with respect to cutting temperature, cutting force, torque and tool life. The experimental results showed that the application of palm oil under minimal quantity lubrication condition as the cutting fluid was more efficient process as it improves the machining performances.

  2. Development of a system of programs HAMMER - ORIGEN - 2 system

    International Nuclear Information System (INIS)

    Guimaraes, L.N.F.

    1984-07-01

    The development of a system of programs (Hamor-2) to calculate precision inventory of LWR reactors is presented. The Hamor-2 code generates with the Hammer-technion code the four (4) energy groupe effective cross section of the actinides: U-235, U-236, U-238, Pu-239, Pu-240, Pu-241, Pu-242. Hamor-2 collapses the four group energy effective cross section to one group energy effective cross section. Hamor-2 calculates with origen-2 the new concentrations for the actinides using the one group energy effective cross section. Two PWR reactors were analised. (HBR, KWO). The discrepancy between the final actinides conentration results calculated by Hamor-2 and the results of measures finded in the references were calculated. That discrepancies have been compared with the discrepancy between : the final actinide concentration results calculated by Origen-2 and some measured results finded in the references. (E.G.) [pt

  3. Load and wear experiments on the impact hammer of a vertical shaft impact crusher

    International Nuclear Information System (INIS)

    Yang, J H; Fang, H Y; Luo, M

    2015-01-01

    Impact hammers are important components of impact crushers, and are often shortlived due to the high-impact nature of their use. Wear-resistant alloys are welded to the surface of impact hammers to prolong their service life. In this paper, a simulation model of the rotor and impact hammers in impact crushers was designed to utilize the Discrete Element Method (DEM). The wear-resistant alloy on each impact hammer was divided into twenty-two action regions. The load distribution on each alloy block is affected by the structural and manufacturing parameters of the impact crusher. The wear distribution of the impact hammer was measured by shape morphology according to relative impact crushers. The results demonstrated that the real measurements of wear distribution on the impact hammer were similar to simulated load distribution measurements on the same surface. The study of load distribution of impact hammers by DEM established a theoretical foundation on which to base the optimal design of impact crushers. (paper)

  4. A wireless sensor system for a biofeedback training of hammer throwers.

    Science.gov (United States)

    Wang, Ye; Wan, Bingjun; Li, Hua; Shan, Gongbing

    2016-01-01

    Hammer-throw has a long-standing history in track and field, but unlike some other sports events, men's hammer throw has not seen a new world record since 1986. One of the possible reasons for this stagnation could be the lack of real-time biomechanical feedback training. In this study, we proposed to establish scientifically described training targets and routes, which in turn required tools that could measure and quantify characteristics of an effective hammer-throw. Towards this goal, we have developed a real-time biomechanical feedback device-a wireless sensor system-to help the training of hammer-throw. The system includes two sensors-an infrared proximity sensor for tracing the hip vertical movement and a load cell for recording the wire tension during a hammer-throw. The system uses XBees for data transmission and an Arduino processor for data processing and system control. The results revealed that the wire tension measurement could supply sufficient key features for coaches to analyze hammer-throw and give real-time feedback for improving training efficiency.

  5. A study on the initiation of condensation-induced water hammer in a long horizontal pipe

    International Nuclear Information System (INIS)

    Park, Joo Wan

    1992-02-01

    Condensation-induced water hammer (CIWH) is the most severe and has the highest frequency among the water hammer events occurred in nuclear power plants. Among mechanisms associated with this type of water hammer, the steam and water countercurrent flow in a horizontal pipe is known as the dominant mechanism in Pressurized Water Reactors. The CIWH due to steam-water counter-flow in a long horizontal pipe has been analytically investigated with emphasis on the effect of pipe length, in order to identify the conditions necessary to initiate a water hammer and to provide stability maps describing the zone of water hammer to be avoided with the combination of filling water flowrate and pipe length. Analytical models which can be used to predict the limiting boundaries, upper and lower one, of CIWH initiation have been developed and the calculation results have been compared with the data of an actual incident occurred previously in a nuclear power plant. From the approach used in this study, boundary estimates including simple relationships between critical inlet water flowrates and pipe length-to-diameter on the CIWH initiation in a long horizontal pipe could be made, and several corrective actions to prevent water hammer recurrence could be taken. However, because of the limited understanding of the direct-contact condensation phenomena in the typical range of nuclear power plant operation, it is likely that the overall uncertainty of the analysis results will be high. Therefore, further research on this area including scaling analysis is required

  6. Maximum Water Hammer Sensitivity Analysis

    OpenAIRE

    Jalil Emadi; Abbas Solemani

    2011-01-01

    Pressure waves and Water Hammer occur in a pumping system when valves are closed or opened suddenly or in the case of sudden failure of pumps. Determination of maximum water hammer is considered one of the most important technical and economical items of which engineers and designers of pumping stations and conveyance pipelines should take care. Hammer Software is a recent application used to simulate water hammer. The present study focuses on determining significance of ...

  7. Condensation driven water hammer studies for feed water distribution pipe

    International Nuclear Information System (INIS)

    Savolainen, S.; Katajala, S.; Elsing, B.; Nurkkala, P.; Longvinov, S.A.; Trunov, N.B.; Sitnik, Yu.K.

    1997-01-01

    Special T-shaped feedwater distribution pipes were installed in steam generators at the Loviisa (Finland) and Rovno (Russia) nuclear power plants. The new shape was tested in an extensive testing programme. Since the tubes frequently suffer from corrosion damage, large-scale water hammer experiments were performed on a model facility in 1996. The main objectives of the water hammer experiments were to find out the prevailing parameters leading to water hammers, as well as the sensitivity of hammering to boundary conditions. A water hammer may occur when the mass flow rate into the steam generator exceeds 6 kg/s and the temperature difference between steam generator and feedwater exceeds 100 degC. Visual experiments and stress analyses of the pipe were also carried out. The weakest part, the T-joint, may hold against such water hammers only for a limited time of the order of few minutes. (M.D.)

  8. Sketches of a hammer-impact, spiked-base, shear-wave source

    Science.gov (United States)

    Hasbrouck, W.P.

    1983-01-01

    Generation of shear waves in shallow seismic investigations (those to depths usually less than 100 m) can be accomplished by horizontally striking with a hammer either the end of a wood plank or metal structure embedded at the ground surface. The dimensioned sketches of this report are of a steel, hammer-impact, spiked-base, shear-wave source. It has been used on outcrops and in a desert environment and for conducting experiments on the effect of rotating source direction.

  9. Advanced Percussive Drilling Technology for Geothermal Exploration and Development

    Energy Technology Data Exchange (ETDEWEB)

    Su, Jiann [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Raymond, David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Prasad, Somuri [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Wolfer, Dale [Atlas-Copco Secoroc LLC, Fagersta (Sweden)

    2017-06-12

    Percussive hammers are a promising advance in drilling technology for geothermal since they rely upon rock reduction mechanisms that are well-suited for use in the hard, brittle rock characteristic of geothermal formations. The project research approach and work plan includes a critical path to development of a high-temperature (HT) percussive hammer using a two phase approach. The work completed in Phase I of the project demonstrated the viability of percussive hammers and that solutions to technical challenges in design, material technology, and performance are likely to be resolved. Work completed in Phase II focused on testing the findings from Phase I and evaluating performance of the materials and designs at high operating temperatures. A high-operating temperature (HOT) drilling facility was designed, built, and used to test the performance of the DTH under extreme conditions. Results from the testing indicate that a high-temperature capable hammer can be developed and is a viable alternative for use in the driller’s toolbox.

  10. Current experience and a new modeling on water hammer due to steam condensation in PWR secondary system

    International Nuclear Information System (INIS)

    Kawanishi, K.; Kasahara, J.; Ueno, T.; Suzuta, T.

    1998-01-01

    There have been possibilities to occur water hammer in pipelines of turbine system for nuclear or fossil fuel power plants. According to the NUREG report, approximately 150 events have been reported since 1969, we also have an experience recently. Water hammer occurs due to sudden steam condensation with pressure pulse. This kind of pressure pulses has been made by alternative producing and condensing of steam slug in the pipe and its frequency relates subcooling and pipe structures. This paper presents our current experience on water hammer with some experimental studies. The present experiment has been performed to obtain the data base for evaluating the pressure pulses. The test pipe was horizontal tubes with dead end connected to vertical tube which simulating drain line in PWR secondary system. The main results are shown as follows; Magnitude of pressure pulse depends drain velocity and initial subcooling. Pipe structure effects on the frequency and continual time of water hammer phenomenon. A new modeling for quantitative explanation of the phenomena is also presented

  11. Color management with a hammer: the B-spline fitter

    Science.gov (United States)

    Bell, Ian E.; Liu, Bonny H. P.

    2003-01-01

    To paraphrase Abraham Maslow: If the only tool you have is a hammer, every problem looks like a nail. We have a B-spline fitter customized for 3D color data, and many problems in color management can be solved with this tool. Whereas color devices were once modeled with extensive measurement, look-up tables and trilinear interpolation, recent improvements in hardware have made B-spline models an affordable alternative. Such device characterizations require fewer color measurements than piecewise linear models, and have uses beyond simple interpolation. A B-spline fitter, for example, can act as a filter to remove noise from measurements, leaving a model with guaranteed smoothness. Inversion of the device model can then be carried out consistently and efficiently, as the spline model is well behaved and its derivatives easily computed. Spline-based algorithms also exist for gamut mapping, the composition of maps, and the extrapolation of a gamut. Trilinear interpolation---a degree-one spline---can still be used after nonlinear spline smoothing for high-speed evaluation with robust convergence. Using data from several color devices, this paper examines the use of B-splines as a generic tool for modeling devices and mapping one gamut to another, and concludes with applications to high-dimensional and spectral data.

  12. A drilling rig tower

    Energy Technology Data Exchange (ETDEWEB)

    Mironov, A.A.; Barashkov, V.A.; Bulgakov, E.S.; Kuldoshin, I.P.; Lebedev, A.I.; Papin, N.M.; Rebrik, B.M.; Sirotkin, N.V.

    1981-05-23

    Presentation is made of a drilling rig tower, comprising a gantry, a support shaft with a bracing strut and drawings out, and turn buckles. In order to increase the reliability of the tower in operation, to decrease the over all dimensions in a transport position, and to decrease the amount of time taken to transfer the tower from an operational position into a transportable one, and vice versa, the tower is equipped with a rotary frame made in the form of a triangular prism, whose lateral edges are connected by hinges: the first one with the lower part of the support shaft, the second with the gantry, and the third one to the upper part of the support shaft by means of the drawings out. The large boundary of the rotary frame is connected by a hinge to the support shaft by means of a bracing strut, which is equipped with a slide block connected to it by a hinge, and the rotary frame has a guide for the slide block reinforced to it on the large boundary. Besides this, the lateral edge of the rotary frame is connected to the gantry by means of turn buckles.

  13. Mechanisms for triceps surae injury in high performance front row rugby union players: a kinematic analysis of scrummaging drills.

    Science.gov (United States)

    Flavell, Carol A; Sayers, Mark G L; Gordon, Susan J; Lee, James B

    2013-01-01

    The front row of a rugby union scrum consists of three players. The loose head prop, hooker and tight head prop. The objective of this study was to determine if known biomechanical risk factors for triceps surae muscle injury are exhibited in the lower limb of front row players during contested scrummaging. Eleven high performance front row rugby union players were landmarked bilaterally at the posterior superior iliac spine (PSIS), greater trochanter, lateral femoral epicondyle, midline of the calcaneus above the plantar aspect of the heel, midline lower leg 5cm and 20cm proximal to the lateral malleolus, at the axis of subtalar joint, lateral malleolus, and head of the fifth metatarsal. Players were video recorded during a series of 2 on 1 live scrummaging drills. Biomechanical three dimensional analysis identified large angular displacements, and increased peak velocities and accelerations at the ankle joint during attacking scrummaging drill techniques when in the stance phase of gait. This places the triceps surae as increased risk of injury and provides valuable information for training staff regarding injury prevention and scrum training practices for front row players. Key pointsFront rowers exhibited patterns of single leg weight bearing, in a position of greater ankle plantar flexion and knee extension at toe off during scrummaging, which is a risk position for TS injury.Front rowers also exhibited greater acceleration at the ankle, knee, and hip joints, and greater changes in ankle ROM from toe strike to toe off during attacking scrum drills.These reported accelerations and joint displacements may be risk factors for TS injury, as the ankle is accelerating into plantar flexion at final push off and the muscle is shortening from an elongated state.

  14. Water hammer caused by rapid steam production in a severe accident in a light water reactor

    International Nuclear Information System (INIS)

    Inasaka, Fujio; Adachi, Masaki; Murata, Hiroyuki; Aya, Izuo

    2007-01-01

    We conducted the experimental studies on the water hammer caused by striking of a water mass pushed up by a rapidly growing steam bubble, using a cylindrical model containment vessel of 0.4286 m in diameter. In the experiments, a rapid gas growth was simulated by injecting high-pressure steam into a water pool. It was clarified that coherency of the water mass movement and its water hammer caused by the condensable gas production considerably decreased in comparison with the case of the non-condensable gas production because the rising velocity of the water mass was suppressed due to the steam bubble condensation. On the basis of the data, experimental correlations for estimating the water hammer on the structures in the containment vessel were proposed. (author)

  15. Water hammer simulator

    International Nuclear Information System (INIS)

    Sinha, S.K.; Madia, J.; Dixon, S.

    1995-01-01

    The Consolidated Edison Company of New York, Inc. (Con Edison) has constructed a first-of-a-kind water hammer events simulator for use at its training center. The Learning Center, Con Edison's central training facility, intends to use the simulator as an educational tool to demonstrate the various mechanisms of the water hammer phenomenon to power plant designers, engineers and operators. The water hammer phenomenon has been studied extensively for the past 15 years for the nuclear industry. However, the acknowledge of the various water hammer mechanisms and the measures to prevent or mitigate water hammer have not been widely disseminated among the operators of fossil-fueled power plants. Con Edison personnel who operate the various generation stations and the New York City steam distribution systems are expected to benefit from the new simulator. Knowledge gained from interacting with the simulator will be very important in helping the Con Edison prevent, mitigate, or accommodate water hammer at its facilities. The water hammer simulator was fabricated in Con Edison's central machine shop. Details of the design and construction of the simulator were finalized in consultation with Creare, Inc., an engineering research firm, located in Hanover, New Hampshire. The simulator seeks to recreate the essential features of water hammer in steam mines following the buildup of cold (subcooled) water by condensation and steam-water interaction. This paper describes the fabrication, design, testing, and operation of the Con Edison water hammer simulator. A discussion of how Con Edison plans to use the facility at The Learning Center is included

  16. Performance of palm oil as a biobased machining lubricant when drilling inconel 718

    OpenAIRE

    Abd Rahim Erween; Sasahara Hiroyuki

    2017-01-01

    Metalworking fluid acts as cooling and lubrication agent at the cutting zone in the machining process. However, conventional Metalworking fluid such mineral oil gives negative impact on the human and environment. Therefore, the manufacture tends to substitute the mineral oil to bio-based oil such as vegetables and synthetic oil. In this paper, the drilling experiment was carried out to evaluate the efficiency of palm oil and compare it with minimal quantity lubrication technique using synthet...

  17. A new drilling method-Earthworm-like vibration drilling.

    Science.gov (United States)

    Wang, Peng; Ni, Hongjian; Wang, Ruihe

    2018-01-01

    The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed "earthworm-like drilling" is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a "soft-string" model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling.

  18. Assessing hospital disaster preparedness: a comparison of an on-site survey, directly observed drill performance, and video analysis of teamwork.

    Science.gov (United States)

    Kaji, Amy H; Langford, Vinette; Lewis, Roger J

    2008-09-01

    There is currently no validated method for assessing hospital disaster preparedness. We determine the degree of correlation between the results of 3 methods for assessing hospital disaster preparedness: administration of an on-site survey, drill observation using a structured evaluation tool, and video analysis of team performance in the hospital incident command center. This was a prospective, observational study conducted during a regional disaster drill, comparing the results from an on-site survey, a structured disaster drill evaluation tool, and a video analysis of teamwork, performed at 6 911-receiving hospitals in Los Angeles County, CA. The on-site survey was conducted separately from the drill and assessed hospital disaster plan structure, vendor agreements, modes of communication, medical and surgical supplies, involvement of law enforcement, mutual aid agreements with other facilities, drills and training, surge capacity, decontamination capability, and pharmaceutical stockpiles. The drill evaluation tool, developed by Johns Hopkins University under contract from the Agency for Healthcare Research and Quality, was used to assess various aspects of drill performance, such as the availability of the hospital disaster plan, the geographic configuration of the incident command center, whether drill participants were identifiable, whether the noise level interfered with effective communication, and how often key information (eg, number of available staffed floor, intensive care, and isolation beds; number of arriving victims; expected triage level of victims; number of potential discharges) was received by the incident command center. Teamwork behaviors in the incident command center were quantitatively assessed, using the MedTeams analysis of the video recordings obtained during the disaster drill. Spearman rank correlations of the results between pair-wise groupings of the 3 assessment methods were calculated. The 3 evaluation methods demonstrated

  19. MECHANISMS FOR TRICEPS SURAE INJURY IN HIGH PERFORMANCE FRONT ROW RUGBY UNION PLAYERS: A KINEMATIC ANALYSIS OF SCRUMMAGING DRILLS

    Directory of Open Access Journals (Sweden)

    Carol A. Flavell

    2013-03-01

    Full Text Available The front row of a rugby union scrum consists of three players. The loose head prop, hooker and tight head prop. The objective of this study was to determine if known biomechanical risk factors for triceps surae muscle injury are exhibited in the lower limb of front row players during contested scrummaging. Eleven high performance front row rugby union players were landmarked bilaterally at the posterior superior iliac spine (PSIS, greater trochanter, lateral femoral epicondyle, midline of the calcaneus above the plantar aspect of the heel, midline lower leg 5cm and 20cm proximal to the lateral malleolus, at the axis of subtalar joint, lateral malleolus, and head of the fifth metatarsal. Players were video recorded during a series of 2 on 1 live scrummaging drills. Biomechanical three dimensional analysis identified large angular displacements, and increased peak velocities and accelerations at the ankle joint during attacking scrummaging drill techniques when in the stance phase of gait. This places the triceps surae as increased risk of injury and provides valuable information for training staff regarding injury prevention and scrum training practices for front row players

  20. Impact Driver With Integral Sliding Hammer

    Science.gov (United States)

    Wallace, Bilby J.

    1987-01-01

    Tool combines impact driver with sliding dead-blow hammer. Used for any purpose for which ordinary impact driver used; tightening fasteners or driving starter holes for drill. Tool protects user from accidental injury and surrounding equipment from damage that might occur from ordinary arm-wielded hammer. Especially useful in underwater work.

  1. Modeling of Comparative Performance of Asphalt Concrete under Hammer, Gyratory, and Roller Compaction

    Directory of Open Access Journals (Sweden)

    Saad I. Sarsam

    2016-11-01

    Full Text Available The main objective of this study is to develop predictive models using SPSS software (version 18 for Marshall Test results of asphalt mixtures compacted by Hammer, Gyratory, and Roller compaction. Bulk density of (2.351 gm/cc, at OAC of (4.7 % was obtained as a benchmark after using Marshall Compactor as laboratory compactive effort with 75-blows. Same density was achieved by Roller and Gyratory Compactors using its mix designed methods. A total of (75 specimens, for Marshall, Gyratory, and Roller Compactors have been prepared, based on OAC of (4.7 % with an additional asphalt contents of more and less than (0.5 % from the optimum value. All specimens have been subjected to Marshall Test. Mathematical models obtained indicated that variation of Marshall Stiffness is based on the variation of air voids. All of these models depend on asphalt cement content too.

  2. Study of cooling rates during metallic glass formation in a hammer and anvil apparatus

    International Nuclear Information System (INIS)

    Kroeger, D.M.; Coghlan, W.A.; Easton, D.S.; Koch, C.C.; Scarbrough, J.O.

    1982-01-01

    A model is presented of the simultaneous spreading and cooling of the liquid drop in a hammer and anvil apparatus for rapid quenching of liquid metals. The viscosity of the melt is permitted to vary with temperature, and to avoid mathematical complications which would be associated with spatial variation of the viscosity, Newtonian cooling is assumed. From an expression for the force required to spread the specimen, coupled equations for the mechanical energy balance for the system and the heat transfer from the sample to the hearth and hammer were obtained, and solved numerically. The sample reaches its final thickness when the force required to deform it becomes greater than the force exerted on it by the decelerating hammer. The model was fit to measurements of sample thickness versus hammer speed, using the interface heat transfer coefficient, h, as an adjustable parameter. The values of h so obtained vary somewhat with the melt alloy/substrate metal combination. From predicted cooling curves, the effects of hammer speed, sample size, and initial melt temperature on the cooling rate and the efficiency of glass formation can be assessed. Addition of sample superheat shifts the cooling curve relative to the expected position of the time-temperature-transformation curve for formation of crystalline material from the melt, and thus is an effective means of increasing the probability of glass formation in this type of apparatus

  3. Coated carbide drill performance under soluble coconut oil lubricant and nanoparticle enhanced MQL in drilling AISI P20

    Science.gov (United States)

    Jamil, N. A. M.; Azmi, A. I.; Fairuz, M. A.

    2016-02-01

    This research experimentally investigates the performance of a TiAlN coated carbide drill bit in drilling AISI P20 through two different kinds of lubricants, namely; soluble coconut oil (SCO) and nanoparticle-enhanced coconut oil (NECO) under minimum quantity lubrication system. The tool life and tool wear mechanism were studied using various cutting speeds of 50, 100 and 150 m/min with a constant feed of 0.01 mm/rev. Since the flank wear land was not regular along the cutting edge, the average flank wear (VB) was measured at several points using image analysis software. The drills were inspected using a scanning electron microscope to further elucidate the wear mechanism. The result indicates that drilling with the nanoparticle- enhanced lubricant was better in resisting the wear and improving the drill life to some extent

  4. Correlation between rotary drill performance parameters and borehole geophysical logging

    International Nuclear Information System (INIS)

    Scoble, M.J.; Peck, J.; Hendricks, C.

    1989-01-01

    There is a growing interest in developing performance monitoring techniques for both surface and underground mining equipment used in excavating, loading and transport systems. Research into the techniques and applications for monitoring drilling machinery including gamma and neutron logging, is reviewed. 17 refs.; 5 figs

  5. Impact of task design on task performance and injury risk: case study of a simulated drilling task.

    Science.gov (United States)

    Alabdulkarim, Saad; Nussbaum, Maury A; Rashedi, Ehsan; Kim, Sunwook; Agnew, Michael; Gardner, Richard

    2017-06-01

    Existing evidence is limited regarding the influence of task design on performance and ergonomic risk, or the association between these two outcomes. In a controlled experiment, we constructed a mock fuselage to simulate a drilling task common in aircraft manufacturing, and examined the effect of three levels of workstation adjustability on performance as measured by productivity (e.g. fuselage completion time) and quality (e.g. fuselage defective holes), and ergonomic risk as quantified using two common methods (rapid upper limb assessment and the strain index). The primary finding was that both productivity and quality significantly improved with increased adjustability, yet this occurred only when that adjustability succeeded in reducing ergonomic risk. Supporting the inverse association between ergonomic risk and performance, the condition with highest adjustability created the lowest ergonomic risk and the best performance while there was not a substantial difference in ergonomic risk between the other two conditions, in which performance was also comparable. Practitioner Summary: Findings of this study supported a causal relationship between task design and both ergonomic risk and performance, and that ergonomic risk and performance are inversely associated. While future work is needed under more realistic conditions and a broader population, these results may be useful for task (re)design and to help cost-justify some ergonomic interventions.

  6. A new drilling method—Earthworm-like vibration drilling

    Science.gov (United States)

    Wang, Peng; Wang, Ruihe

    2018-01-01

    The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed “earthworm-like drilling” is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a “soft-string” model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling. PMID:29641615

  7. Improved dental implant drill durability and performance using heat and wear resistant protective coatings.

    Science.gov (United States)

    Er, Nilay; Alkan, Alper; İlday, Serim; Bengu, Erman

    2018-03-02

    Dental implant drilling procedure is an essential step for implant surgery and frictional heat appeared in bone during drilling is a key factor affecting the success of an implant. The aim of this study is to increase the dental implant drill lifetime and performance using heat- and wear-resistant protective coatings hence to decrease the alveolar bone temperature caused by the dental implant drilling procedure. Commercially obtained stainless steel drills were coated with titanium aluminum nitride, diamond-like carbon, titanium boron nitride, and boron nitride coatings via magnetron-sputter deposition. Drilling procedure was performed on a bovine femoral cortical bone under the conditions mimicking clinical practice, where the tests were performed both under water-assisted cooling and under the conditions without any cooling was applied. Coated drill performances and durabilities were compared to that of three commonly used commercial drills which surfaces are made from namely; zirconia, black diamond and stainless steel. Protective coatings with boron nitride, titanium boron nitride and diamond-like carbon have significantly improved drill performance and durability. Especially boron nitride-coated drills have performed within safe bone temperature limits for 50 drillings even without any cooling is applied. Titanium aluminium nitride coated drills did not show any improvement over commercially obtained stainless steel drills. Surface modification using heat and wear resistant coatings is an easy and highly effective way to improve implant drill performance and durability, which can reflect positively on surgical procedure and healing period afterwards. The noteworthy success of different types of coatings is novel and likely to be applicable to various other medical systems.

  8. Utilization of the Nelkin model in a Hammer computer code for calculation the reactor parameters

    International Nuclear Information System (INIS)

    Leal, L.C.

    1980-07-01

    The possibility of modifying the HAMMER code, in the thermal part, by changing the thermal neutron scattering Kernel of its library for another one calculated in a subprogramm which can be incorporated to the code, is studied. This subprogramm uses the original version of the Nelkin model instead of its approximation which is used in the HAMMER. It has the advantage of giving the values of the Kernel for any temperature of the reactor for the approximations P 0 , P 1 , P 2 and P 3 . (Author) [pt

  9. A Water Hammer Protection Method for Mine Drainage System Based on Velocity Adjustment of Hydraulic Control Valve

    Directory of Open Access Journals (Sweden)

    Yanfei Kou

    2016-01-01

    Full Text Available Water hammer analysis is a fundamental work of pipeline systems design process for water distribution networks. The main characteristics for mine drainage system are the limited space and high cost of equipment and pipeline changing. In order to solve the protection problem of valve-closing water hammer for mine drainage system, a water hammer protection method for mine drainage system based on velocity adjustment of HCV (Hydraulic Control Valve is proposed in this paper. The mathematic model of water hammer fluctuations is established based on the characteristic line method. Then, boundary conditions of water hammer controlling for mine drainage system are determined and its simplex model is established. The optimization adjustment strategy is solved from the mathematic model of multistage valve-closing. Taking a mine drainage system as an example, compared results between simulations and experiments show that the proposed method and the optimized valve-closing strategy are effective.

  10. Validity and Reliability of the Cycleops Hammer Cycle Ergometer.

    Science.gov (United States)

    Lillo-Bevia, José R; Pallarés, Jesús G

    2017-11-28

    To validate the new drive indoor trainer Hammer designed by Cycleops®. Eleven cyclists performed 44 randomized and counterbalanced graded exercise tests (100-500W), at 70, 85 and 100 rev.min -1 cadences, in seated and standing positions, on 3 different Hammer units, while a scientific SRM system continuously recorded cadence and power output data. No significant differences were detected between the three Hammer devices and the SRM for any workload, cadence, or pedalling condition (P value between 1.00 and 0.350), except for some minor differences (P 0.03 and 0.04) found in the Hammer 1 at low workloads, and for Hammer 2 and 3 at high workloads, all in seated position. Strong ICCs were found between the power output values recorded by the Hammers and the SRM (≥0.996; P=0.001), independently from the cadence condition and seated position. Bland-Altman analysis revealed low Bias (-5.5-3.8) and low SD of Bias (2.5-5.3) for all testing conditions, except marginal values found for the Hammer 1 at high cadences and seated position (9.6±6.6). High absolute reliability values were detected for the 3 Hammers (150-500W; CVreliable device to drive and measure power output in cyclists, providing an alternative to larger and more expensive laboratory ergometers, and allowing cyclists to use their own bicycle.

  11. If I Had a Hammer: Technology in the Language Arts Classroom.

    Science.gov (United States)

    Jester, Richard

    2002-01-01

    Describes the computer as a hammer, a tool with unique qualities that allows people to perceive, manipulate, and express language in ways quite different from traditional media. Explores the tool of the multimedia presentation, a common use of technology in classrooms today. Describes a simple project with sixth graders that incorporates reading,…

  12. Water hammer with column separation : a review of research in the twentieth century

    NARCIS (Netherlands)

    Bergant, A.; Simpson, A.R.; Tijsseling, A.S.

    2004-01-01

    Column separation refers to the breaking of liquid columns in fully filled pipelines. This may occur in a water hammer event when the pressure drops to the vapor pressure at specific locations such as closed ends, high points or knees (changes in pipe slope). A vapor cavity, driven by the inertia of

  13. Experimental and numerical analysis of water hammer in a large-scale PVC pipeline apparatus

    NARCIS (Netherlands)

    Bergant, A.; Hou, Q.; Keramat, A.; Tijsseling, A.S.; Gajic, A.; Benisek, M.; Nedeljkovic, M.

    2011-01-01

    This paper investigates the effects of the pipe-wall viscoelasticity on water-hammer pressures. A large-scale pipeline apparatus made of polyvinyl chloride (PVC) at Deltares, Delft, The Netherlands, has been used to carry out waterhammer experiments. Tests have been conducted in a

  14. Drilling a better pair : new technologies in SAGD directional drilling

    Energy Technology Data Exchange (ETDEWEB)

    Zimmer, C.; Richter, D. [Statoil Canada Ltd., Calgary, AB (Canada); Person, J.; Tilley, J.; Bittar, M. [Halliburton Energy Services, Calgary, AB (Canada)

    2010-07-01

    The Leismer Demonstration Project (LDP) is the first of 8 proposed major steam assisted gravity drainage (SAGD) projects for Statoil's Kai Kos Dehseh (KKD) asset in the Athabasca oil sands deposit. The bitumen resources are expected to produce approximately 2.2 billion barrels of oil over approximately 35 years with a peak production of 220,000 bbl/day. To date, 23 well pairs have been drilled on 4 drilling pads. The precise placement of well pairs is among the most important factors in a successful SAGD drilling program. The producer well must be placed in relation to the reservoir boundaries. It must also be accurately twinned with the injector well. A strong focus on technological innovation is needed in order to deliver on these high expectations in unconsolidated formations, such as the McMurray oil sands. Lateral SAGD pairs are often drilled with conventional steerable mud motors and logging-while-drilling (LWD) resistivity measurements, but this combination imposes certain limitations in terms of wellbore quality and placement. Several industry firsts were successfully implemented at the Statoil LDP, including a combination of the newest and most cutting-edge directional, measurement, and LWD technology. The keystone of these industry firsts was the use of a soft formation modified, point-the-bit rotary steerable system (RSS), used on 20 horizontal wells. The RRS was combined with an ultra deep azimuthal resistivity sensor to provide precise geosteering along the bottom bed boundary in the producer wells, resulting in improved reservoir capture and reservoir characterization. This paper described the new drilling system and its impact on the progressive future of directional drilling in SAGD. 8 refs., 1 tab., 22 figs.

  15. Learning to Control Orientation and Force in a Hammering Task The Initial Stage

    NARCIS (Netherlands)

    Vernooij, Carlijn A.; Mouton, Leonora J.; Bongers, Raoul M.

    2012-01-01

    The ability to create stone tools is considered an important step in the emergence of human cognition. To further our understanding of these evolutionary processes we focused on the initial learning processes with which this percussive skill may be acquired. We studied a hammering task in which

  16. Water hammer due to rapid bubble growth at a severe accident

    International Nuclear Information System (INIS)

    Aya, Izuo; Adachi, Masaki; Shiozaki, Koki; Inasaka, Fujio

    2000-01-01

    On a severe accident of the light water reactor (LWR), by steam explosion and so forth due to hydrogen formation by water-metal reaction and direct contact of molted core with water, it is presumed that a lot of vapor forms for a short time in water at reactor vessel and under part of containment vessel. This study aims at and carries out, under reference of the conventional study results, experimental elucidation on coherence of water block motion due to rapid bubble growth, proposal on reduction method of water hammering, development of water hammer estimating method in an actual reactor, and proposal for upgrading of reliability on severe accident evaluation. In 1998 fiscal year, an 'Experimental apparatus on water hammering elements on sever accident' simulated rapid bubble growth due to steam explosion by injecting high pressure air into water was produced to carry out its function test. As a result of the carried out function tests, extreme water hammering phenomena were observed, by which validity of establishment on the study objects could be confirmed. (G.K.)

  17. Impact of Drill and Blast Excavation on Repository Performance Confirmation

    International Nuclear Information System (INIS)

    Keller, R.; Francis, N.; Houseworth, J.; Kramer, N.

    2000-01-01

    There has been considerable work accomplished internationally examining the effects of drill and blast excavation on rock masses surrounding emplacement openings of proposed nuclear waste repositories. However, there has been limited discussion tying the previous work to performance confirmation models such as those proposed for Yucca Mountain, Nevada. This paper addresses a possible approach to joining the available information on drill and blast excavation and performance confirmation. The method for coupling rock damage data from drill and blast models to performance assessment models for fracture flow requires a correlation representing the functional relationship between the peak particle velocity (PPV) vibration levels and the potential properties that govern water flow rates in the host rock. Fracture aperture and frequency are the rock properties which may be most influenced by drill and blast induced vibration. If it can be shown (using an appropriate blasting model simulation) that the effect of blasting is far removed from the waste package in an emplacement drift, then disturbance to the host rock induced in the process of drill and blast excavation may be reasonably ignored in performance assessment calculations. This paper proposes that the CANMET (Canada Center for Mineral and Energy Technology) Criterion, based on properties that determine rock strength, may be used to define a minimum PPV. This PPV can be used to delineate the extent of blast induced damage. Initial applications have demonstrated that blasting models can successfully be coupled with this criterion to predict blast damage surrounding underground openings. The Exploratory Studies Facility at Yucca Mountain has used a blasting model to generate meaningful estimates of near-field vibration levels and damage envelopes correlating to data collected from pre-existing studies conducted. Further work is underway to expand this application over a statistical distribution of geologic

  18. Structure and Conceptual Design of a Water-Hammering-Type Honsang for Restoration

    Directory of Open Access Journals (Sweden)

    Yong Sam Lee

    2012-06-01

    Full Text Available We analyzed the manufacturing procedure, specifications, repair history, and details of celestial movements of the water-hammering type Honsang (celestial globe. Results from our study on the remaining Honsangs in China and Japan and on the reconstruction models in Korea were applied to our conceptual design of the water-hammering type Honsang. A Honui (armillary sphere and Honsang using the water-hammering method were manufactured in Joseon in 1435 (the 17th year of King Sejong. Jang Yeong-Sil developed the Honsang system based on the water-operation method of Shui yün i hsiang t’ai in China. Water-operation means driving water wheels using a water flow. The most important factor in this type of operation is the precision of the water clock and the control of the water wheel movement. The water-hammering type Honsang in Joseon probably adopted the Cheonhyeong (天衡; oriental escapement device system of Shui yün i hsiang t’ai in China and the overflow mechanism of Jagyeongnu (striking clepsydra in Joseon, etc. In addition to the Cheonryun system, more gear instruments were needed to stage the rotation of the Honsang globe and the sun’s movement. In this study, the water-hammering mechanism is analyzed in the structure of a water clock, a water wheel, the Cheonhyeong system, and the Giryun system, as an organically working operation mechanism. We expect that this study will serve as an essential basis for studies on Heumgyeonggaknu, the water-operating astronomical clock, and other astronomical clocks in the middle and latter parts of the Joseon dynasty.

  19. Counterevidence to the ion hammering scenario as a driving force for the shape elongation of embedded nanoparticles

    Science.gov (United States)

    Amekura, H.; Okubo, N.; Tsuya, D.; Ishikawa, N.

    2017-08-01

    Counterevidence is provided in the ion-hammering scenario as a driving force for the shape elongation of embedded nanoparticles (NPs) under swift heavy ion irradiation (SHII). Ion-induced compaction and the hammering, which are both induced in silica under SHII, dominate at low and high fluences, respectively, causing a crossover between them around a fluence of ˜4 × 1012 ions/cm2. Nevertheless, the shape elongation of NPs detected by the optical dichroism exhibits nearly linear dependence in a wide fluence range between ˜1 × 1011 and 2 × 1013 ions/cm2, indicating that the hammering does not play an important role.

  20. Water hammer caused by rapid gas production in a severe accident in a light water reactor

    International Nuclear Information System (INIS)

    Inasaka, Fujio; Adachi, Masaki; Aya, Izuo; Nariai, Hideki; Shiozaki, Kohki

    2005-01-01

    We investigated the water hammer caused by striking of water mass pushed up by a rapidly growing bubble and its scale effects using two cylindrical model containment vessels of 1.0 and 0.428 m diameters. We also closely observed the movement of water mass and the growing bubble in the vessels. In these experiments, rapid bubble growth was simulated by injecting high-pressure air into a water pool. It was clarified that the water mass was pushed up without any air penetration until the water level reached a certain elevation. On the basis of all data, experimental correlations for estimating the height and striking velocity of the water mass with coherency were proposed, and the water hammer pressure for exerting large forces on the structures was quantitatively evaluated. (author)

  1. DE-FOA-EE0005502 Advanced Percussive Drilling Technology for Geothermal Exploration and Development Phase II Report.

    Energy Technology Data Exchange (ETDEWEB)

    Su, Jiann-Cherng [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Raymond, David W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Prasad, Somuri V. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Wolfer, Dale R. [Atlas-Copco Secoroc, LLC, Fagersta (Sweden)

    2017-05-01

    Percussive hammers are a promising advance in drilling technology for geothermal since they rely upon rock reduction mechanisms that are well-suited for use in the hard, brittle rock characteristic of geothermal formations. The project research approach and work plan includes a critical path to development of a high-temperature (HT) percussive hammer using a two- phase approach. The work completed in Phase I of the project demonstrated the viability of percussive hammers and that solutions to technical challenges in design, material technology, and performance are likely to be resolved. Work completed in Phase II focused on testing the findings from Phase I and evaluating performance of the materials and designs at high- operating temperatures. A high-operating temperature (HOT) drilling facility was designed, built, and used to test the performance of the DTH under extreme conditions. Results from the testing indicate that a high-temperature capable hammer can be developed and is a viable alternative for user in the driller's toolbox.

  2. Numerical analyses of a water pool under loadings caused by a condensation induced water hammer

    Energy Technology Data Exchange (ETDEWEB)

    Timperi, A.; Paettikangas, T.; Calonius, K.; Tuunanen, J.; Poikolainen, J.; Saarenheimo, A. [VTT Industrial Systems (Finland)

    2004-03-01

    Three-dimensional simulations of a rapidly condensing steam bubble in a water pool have been performed by using the commercial computational fluid dynamics (CFD) code Star-CD. The condensing bubble was modelled by using a mass sink in a single-phase calculation. The pressure load on the wall of the pool was determined and transferred to the structural analyses code ABAQUS. The analyses were done for a test pool at Lappeenranta University of Technology. The structural integrity of the pool during steam experiments was investigated by assuming as a test load the rapid condensation of a steam bubble with a diameter of 20 cm. The mass sink for modelling the collapse of the bubble was deter-mined from the potential theory of incompressible fluid. The rapid condensation of the bubble within 25 ms initiated a strong condensation water hammer. The maximum amplitude of the pressure load on the pool wall was approximately 300 kPa. The loads caused by the high compression waves lasted only about 0.4 ms. The loadings caused by larger bubbles or more rapid collapse could not be calculated with the present method. (au)

  3. Analytical study on water hammer pressure in pressurized conduits with a throttled surge chamber for slow closure

    Directory of Open Access Journals (Sweden)

    Yong-liang Zhang

    2010-06-01

    Full Text Available This paper presents an analytical investigation of water hammer in a hydraulic pressurized pipe system with a throttled surge chamber located at the junction between a tunnel and a penstock, and a valve positioned at the downstream end of the penstock. Analytical formulas of maximum water hammer pressures at the downstream end of the tunnel and the valve were derived for a system subjected to linear and slow valve closure. The analytical results were then compared with numerical ones obtained using the method of characteristics. There is agreement between them. The formulas can be applied to estimating water hammer pressure at the valve and transmission of water hammer pressure through the surge chamber at the junction for a hydraulic pipe system with a surge chamber.

  4. Technical report for a fluidless directional drilling system demonstrated at Solid Waste Storage Area 6 shallow buried waste sites

    International Nuclear Information System (INIS)

    1995-09-01

    The purpose of the research was to demonstrate a fluidless directional drilling and monitoring system (FDD) specifically tailored to address environmental drilling concerns for shallow buried wasted. The major concerns are related to worker exposure, minimizing waste generation, and confining the spread of contamination. The FDD is potentially applicable to Environmental Restoration (ER) activities for the Oak Ridge National Laboratory Waste Area Grouping 6 (WAG 6) shallow buried waste disposed in unlined trenches. Major ER activities for directional drilling are to develop a drilling system for leachate collection directly beneath trenches, and to provide localized control over leachate release to the environment. Other ER FDD activities could include vadose zone and groundwater monitoring of contaminant transport. The operational constraints pointed the research in the direction of purchasing a steerable impact hammer, or mole, manufactured by Steer-Rite Ltd. of Racine, Wisconsin. This drill was selected due to the very low cost ($25,000) associated with procuring the drill, steering module, instrumentation and service lines. The impact hammer is a self propelled drill which penetrates the soil by compacting cut material along the sidewalls of the borehole. Essentially, it forces its way through the subsurface. Although the pneumatic hammer exhausts compressed air which must be handled at the borehole collar, it does not generate soil cuttings or liquids. This is the basis for the term fluidless. A stub casing muffler was attached to the entrance hole for controlling exhaust gas and any airborne releases. Other environmental compliance modifications made to the equipment included operating the tool without lubrication, and using water instead of hydraulic fluid to actuate the steering fins on the tool

  5. Drilling of bone: A comprehensive review

    Science.gov (United States)

    Pandey, Rupesh Kumar; Panda, S.S.

    2013-01-01

    Background Bone fracture treatment usually involves restoring of the fractured parts to their initial position and immobilizing them until the healing takes place. Drilling of bone is common to produce hole for screw insertion to fix the fractured parts for immobilization. Orthopaedic drilling during surgical process causes increase in the bone temperature and forces which can cause osteonecrosis reducing the stability and strength of the fixation. Methods A comprehensive review of all the relevant investigations carried on bone drilling is conducted. The experimental method used, results obtained and the conclusions made by the various researchers are described and compared. Result Review suggests that the further improvement in the area of bone drilling is possible. The systematic review identified several consequential factors (drilling parameters and drill specifications) affecting bone drilling on which there no general agreement among investigators or are not adequately evaluated. These factors are highlighted and use of more advanced methods of drilling is accentuated. The use of more precise experimental set up which resembles the actual situation and the development of automated bone drilling system to minimize human error is addressed. Conclusion In this review, an attempt has been made to systematically organize the research investigations conducted on bone drilling. Methods of treatment of bone fracture, studies on the determination of the threshold for thermal osteonecrosis, studies on the parameters influencing bone drilling and methods of the temperature measurement used are reviewed and the future work for the further improvement of bone drilling process is highlighted. PMID:26403771

  6. Dynamic Analysis of Hammer Mechanism "Twin Hammer" of Impact Wrench

    Science.gov (United States)

    Konečný, M.; Slavík, J.

    This paper describes function of the hammer mechanism "Twin hammer" the impact wrench, calculation of dynamic forces exerted on the mechanism and determining the contact pressures between the parts of the mechanism. The modelling of parts was performed in system Pro ENGINEER—standard. The simulation and finding dynamic forces was performed in advanced module Pro ENGINEER—mechanism design and finding contacts pressures in modul Pro ENGENEER—mechanica.

  7. Advanced control strategies for a drill rig

    International Nuclear Information System (INIS)

    Banerjee, A.; Hiller, M.; Fink, B.

    1996-01-01

    The construction of tunnels is usually undertaken using a combination of blasting and drilling to achieve rock excavation. Easy handling and high accuracy, and thus greater efficiency, in drilling rigs is an essential ingredient of successful competition in the market place. This article describes a cartesian control concept used for a twin boom drill rig. This simplifies the handling of a drilling boom, reduces the duration of a working cycle and increases security. A remote control system has been added to the drill rig to support the operator working in complicated environments. (UK)

  8. A Hybrid Resynthesis Model for Hammer-String Interaction of Piano Tones

    Directory of Open Access Journals (Sweden)

    Jensen Kristoffer

    2004-01-01

    Full Text Available This paper presents a source/resonator model of hammer-string interaction that produces realistic piano sound. The source is generated using a subtractive signal model. Digital waveguides are used to simulate the propagation of waves in the resonator. This hybrid model allows resynthesis of the vibration measured on an experimental setup. In particular, the nonlinear behavior of the hammer-string interaction is taken into account in the source model and is well reproduced. The behavior of the model parameters (the resonant part and the excitation part is studied with respect to the velocities and the notes played. This model exhibits physically and perceptually related parameters, allowing easy control of the sound produced. This research is an essential step in the design of a complete piano model.

  9. Comparison of Electrostatic Fins with Piezoelectric Impact Hammer Techniques to Extend Impulse Calibration Range of a Torsional Thrust Stand (Preprint)

    Science.gov (United States)

    2011-03-23

    prac- tical max impulse to 1mNs. The newly developed Piezo - electric Impact Hammer (PIH) calibration system over- comes geometric limits of ESC...the fins to behave as part of an LRC circuit which results in voltage oscillations. By adding a resistor in series between the pulse generator and...series resistor as well as the effects of no loading on the pulse generator. III. PIEZOELECTRIC IMPACT HAMMER SYSTEM The second calibration method tested

  10. Technical performance of drilling operations of wells Erslev 1 and 2 on Mors Salt Dome

    International Nuclear Information System (INIS)

    Gomm, H.

    1982-01-01

    This paper deals strictly with the performance of the drilling itself. The wells were designed and drilled by an international team of experts, using a Cabot Franks Explorer 900 rig. The two exploration wells were located in the top area of the Mors Saltdome after geological and geophysical investigations at a distance of about 1 100 m. (EG)

  11. Evaluation of accuracy in implant site preparation performed in single- or multi-step drilling procedures.

    Science.gov (United States)

    Marheineke, Nadine; Scherer, Uta; Rücker, Martin; von See, Constantin; Rahlf, Björn; Gellrich, Nils-Claudius; Stoetzer, Marcus

    2018-06-01

    Dental implant failure and insufficient osseointegration are proven results of mechanical and thermal damage during the surgery process. We herein performed a comparative study of a less invasive single-step drilling preparation protocol and a conventional multiple drilling sequence. Accuracy of drilling holes was precisely analyzed and the influence of different levels of expertise of the handlers and additional use of drill template guidance was evaluated. Six experimental groups, deployed in an osseous study model, were representing template-guided and freehanded drilling actions in a stepwise drilling procedure in comparison to a single-drill protocol. Each experimental condition was studied by the drilling actions of respectively three persons without surgical knowledge as well as three highly experienced oral surgeons. Drilling actions were performed and diameters were recorded with a precision measuring instrument. Less experienced operators were able to significantly increase the drilling accuracy using a guiding template, especially when multi-step preparations are performed. Improved accuracy without template guidance was observed when experienced operators were executing single-step versus multi-step technique. Single-step drilling protocols have shown to produce more accurate results than multi-step procedures. The outcome of any protocol can be further improved by use of guiding templates. Operator experience can be a contributing factor. Single-step preparations are less invasive and are promoting osseointegration. Even highly experienced surgeons are achieving higher levels of accuracy by combining this technique with template guidance. Hereby template guidance enables a reduction of hands-on time and side effects during surgery and lead to a more predictable clinical diameter.

  12. A four-equation friction model for water hammer calculation in quasi-rigid pipelines

    International Nuclear Information System (INIS)

    Ghodhbani, Abdelaziz; Haj Taïeb, Ezzeddine

    2017-01-01

    Friction coupling affects water hammer evolution in pipelines according to the initial flow regime. Unsteady friction models are only validated with uncoupled formulation. On the other hand, coupled models such as four-equation model, provide more accurate prediction of water hammer since fluid-structure interaction (FSI) is taken into account, but they are limited to steady-state friction formulation. This paper deals with the creation of the “four-equation friction model” which is based on the incorporation of the unsteady head loss given by an unsteady friction model into the four-equation model. For transient laminar flow cases, the Zielke model is considered. The proposed model is applied to a quasi-rigid pipe with axial moving valve, and then calculated by the method of characteristics (MOC). Damping and shape of the numerical solution are in good agreement with experimental data. Thus, the proposed model can be incorporated into a new computer code. - Highlights: • Both Zielke model and four-equation model are insufficient to predict water hammer. • The four-equation friction model proposed is obtained by incorporating the unsteady head loss in the four-equation model. • The solution obtained by the proposed model is in good agreement with experimental data. • The wave-speed adjustment scheme is more efficient than interpolations schemes.

  13. 40 CFR 194.33 - Consideration of drilling events in performance assessments.

    Science.gov (United States)

    2010-07-01

    ... assessments. (a) Performance assessments shall examine deep drilling and shallow drilling that may potentially affect the disposal system during the regulatory time frame. (b) The following assumptions and process... process shall be documented in any compliance application: (1) Inadvertent and intermittent intrusion by...

  14. Excavation and drilling at a spent-fuel test facility in granitic rock

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, W.C.; Mayr, M.C.

    1981-10-01

    Funding for a project to test the feasibility of safe and reliable storage and retrieval of spent fuel from a commercial nuclear reactor was approved by the Department of Energy on June 2, 1978. By May 28, 1980, 11 spent-fuel assemblies had been emplaced 420 m below the surface in the Climax granitic stock at the Nevada Test Site. Design and construction of the Spent Fuel Test-Climax, including fuel emplacement, had taken less than two years, at a total cost of $18.4 million. Construction activities were preceded by geologic exploration using four cored holes and existing underground workings. The sinking of a 0.76-m-diam shaft to the 420-m level initiated construction at the site. Effective rates of sinking varied from 0.16 m/h with a rotary tricone drill to 0.5 m/h with a hammer drill. Underground excavation included a central canister-storage drift 4.6 x 6.1 x 64 m long, two parallel 3.4 x 3.4-m heater drifts, and a tail drift. About 6700 m{sup 3} were excavated at an average rate of 2 m{sup 3}/h, and 178 cored holes, with diameters from 38 to 152 mm, were drilled. A total length of nearly 1100 m was drilled at rates ranging from 0.4 m/h to 1 m/h, depending on hole size and drilling equipment. Eighteen 610-mm-diam canister emplacement holes were hammer-drilled at an average rate of 1.4 m/h. The use of the critical path method, integrated contractors, and close cooperation between project participants facilitated completion of the project on schedule.

  15. Excavation and drilling at a spent-fuel test facility in granitic rock

    International Nuclear Information System (INIS)

    Patrick, W.C.; Mayr, M.C.

    1981-10-01

    Funding for a project to test the feasibility of safe and reliable storage and retrieval of spent fuel from a commercial nuclear reactor was approved by the Department of Energy on June 2, 1978. By May 28, 1980, 11 spent-fuel assemblies had been emplaced 420 m below the surface in the Climax granitic stock at the Nevada Test Site. Design and construction of the Spent Fuel Test-Climax, including fuel emplacement, had taken less than two years, at a total cost of $18.4 million. Construction activities were preceded by geologic exploration using four cored holes and existing underground workings. The sinking of a 0.76-m-diam shaft to the 420-m level initiated construction at the site. Effective rates of sinking varied from 0.16 m/h with a rotary tricone drill to 0.5 m/h with a hammer drill. Underground excavation included a central canister-storage drift 4.6 x 6.1 x 64 m long, two parallel 3.4 x 3.4-m heater drifts, and a tail drift. About 6700 m 3 were excavated at an average rate of 2 m 3 /h, and 178 cored holes, with diameters from 38 to 152 mm, were drilled. A total length of nearly 1100 m was drilled at rates ranging from 0.4 m/h to 1 m/h, depending on hole size and drilling equipment. Eighteen 610-mm-diam canister emplacement holes were hammer-drilled at an average rate of 1.4 m/h. The use of the critical path method, integrated contractors, and close cooperation between project participants facilitated completion of the project on schedule

  16. A drilling mud for drilling wells in collapsing rocks

    Energy Technology Data Exchange (ETDEWEB)

    Bochkarev, G P; Anderson, B A; Minkhayrov, K A; Sharipov, A U

    1982-01-01

    In a known drilling mud for drilling wells in collapsing rocks, which contains clay, sodium silicate and polyacrylamide (PAA), in order to increase its specific electrical resistance and to increase the strengthening properties, a silicoorganic liquid is additionally introduced into its composition with the following component ratio (percent): clay, 5 to 7; sodium silicate, 5 to 7; polyacrylamide, 0.3 to 0.5; silicoorganic liquid, GKZh-94, 0.5 to 1.5 and water, the remainder. The GKZh-94 is a chemical compound based on alkylphenylchlorsilanes and substituted ethers of orthosilicic acid, used for waterproofing fabrics and soils. The addition of GKZh-94 provides the required values of the specific electric resistance of the mud and does not distort the gas logging indications. The proposed mud has low water production (4 to 6 cubic centimeters), optimal viscosity (25 to 31 seconds) and high structural and mechanical properties. Its strengthening properties are substantially above those of the known mud.

  17. The impacts of hammer-mill screen size and grain particle size on the performance of broiler chickens offered diets based on two red sorghum varieties.

    Science.gov (United States)

    Selle, P H; Truong, H H; Khoddami, A; Moss, A F; Roberts, T H; Liu, S Y

    2016-12-12

    1. The two red grain sorghums were extensively characterised. Kafirin, polyphenolic compounds, free, conjugated and bound phenolic acids, phytate concentrations and starch pasting profiles were determined. 2. The experiment consisted of a 2 × 4 factorial array of dietary treatments comprising two red sorghum varieties (Tiger and Block I) ground through 4 hammer-mill screen sizes (2.0, 3.2, 4.8 6.0 mm) prior to incorporation into nutritionally equivalent diets. Eight steam-pelleted dietary treatments were each offered to 7 replicates (6 male Ross 308 birds per cage) from 7 to 28 d post-hatch. 3. Effects of dietary treatments on growth performance, relative gizzard and pancreas weights, nutrient utilisation, apparent starch and protein (N) digestibility coefficients and disappearance rates from 4 small intestinal segments were determined. 4. The 2.0-mm hammer-mill screen generated an average geometric mean particle size of 794 μm and the 6.0-mm screen a mean particle size of 1405 μm. However, hammer-mill screen size did not influence weight gain or FCR. The 6.0-mm screen size generated significantly higher starch and protein (N) digestibility coefficients in the distal jejunum and distal ileum than the 2.0-mm hammer-mill screen. 5. Tiger sorghum was superior to Block I sorghum, as significant advantages were observed for feed conversion ratios (3.25%), AME (0.37 MJ), ME:GE ratios (4.15%), AMEn (0.53 MJ), distal ileal starch digestibility coefficients (2.46%) and protein (N) digestibility coefficients in the distal jejunum (4.66%), proximal ileum (1.96%) and distal ileum (2.16%). The inferior Block I sorghum contained more kafirin (67.1 versus 51.3 g/kg), phytate (9.79 versus 8.40 g/kg), total phenolic compounds (4.68 versus 4.12 mg GAE/g), flavan-4-ols (7.98 versus 5.04 ABS/ml/g), total phenolic acids (554 versus 402 μg/g) and total ferulic acid (375 versus 281 μg/g) in comparison to Tiger sorghum.

  18. Dead-blow hammer design applied to a calibration target mechanism to dampen excessive rebound

    Science.gov (United States)

    Lim, Brian Y.

    1991-01-01

    An existing rotary electromagnetic driver was specified to be used to deploy and restow a blackbody calibration target inside of a spacecraft infrared science instrument. However, this target was much more massive than any other previously inherited design applications. The target experienced unacceptable bounce when reaching its stops. Without any design modification, the momentum generated by the driver caused the target to bounce back to its starting position. Initially, elastomeric dampers were used between the driver and the target. However, this design could not prevent the bounce, and it compromised the positional accuracy of the calibration target. A design that successfully met all the requirements incorporated a sealed pocket 85 percent full of 0.75 mm diameter stainless steel balls in the back of the target to provide the effect of a dead-blow hammer. The energy dissipation resulting from the collision of balls in the pocket successfully dampened the excess momentum generated during the target deployment. The disastrous effects of new requirements on a design with a successful flight history, the modifications that were necessary to make the device work, and the tests performed to verify its functionality are described.

  19. Tests of HAMMER (original) and HAMMER-TECHNION systems with critical experiments

    International Nuclear Information System (INIS)

    Santos, A. dos

    1986-01-01

    Performances of the reactor cell codes HAMMER (original) and HAMMER-TECHNION were tested against experimental results of critical benchmarks. The option made was the utilization of consistent methodologies so that only the NIT (Nordheim Integral Technique) was utilized in the HAMMER-TECHNION. All differences encountered in the analysis made with these systems can be attributed to their basic nuclear data library. Five critical benchmarks was utilized on this study. Surprisingly, the performance of the original HAMMER system was betterthan that of the HAMMER-TECHNION. (Author) [pt

  20. Hypothenar hammer syndrome: caused by a muscle anomaly? A case report with review of the literature.

    Science.gov (United States)

    Estermann, Lea; Ducommun, Pascal; Steurer-Dober, Isabelle; Hug, Urs

    2018-05-01

    The hypothenar hammer syndrome (HHS) is a rare entity of secondary Raynaud's phenomenon. The blunt hypothenar trauma causes a lesion of the vessel wall with a consecutive thrombosis or aneurysm of the ulnar artery at the Guyon's canal. Different risk factors are discussed such as nicotine abuse, or a muscle anomaly in the Guyon's canal. To date, there are five case reports published about muscle anomalies and HHS. We present a case of a 51-year-old shipbuilder with a unilateral HHS on his right dominant hand with a bilateral muscle anomaly. We successfully treated the patient by resection of the aneurysm without a resection of the atypical muscle.

  1. Assessment of a potential rapid condensation induced water hammer in a passive auxiliary feedwater system

    Energy Technology Data Exchange (ETDEWEB)

    Jo, Jong Chull; Shin, Byung Soo; Do, Kyu Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of); Moody, Frederick J. [General Electric (Retired), CA (United States)

    2012-10-15

    A passive auxiliary feedwater system (PAFS) which is incorporated in the APR+ system is a kind of closed natural circulation loop. The PAFS has no operating functions during normal plant operation, but it has a dedicated safety function of the residual heat removal following initiating events, including the unlikely event of the most limiting single failure occurring coincident with a loss of offsite power, when the feedwater system becomes inoperable or unavailable. Even in the unlikely event of a station blackout, the isolation valves can be opened either by DC power or manual operation and then the PAFS can also provide adequate condensate to the steam generator (SG). The PAFS piping in the vicinity of each of the two SGs is designed to minimize the potential for destructive water hammer during start up operation by setting the stroke time for full close or full open of the condensate isolation valves upon receipt of a passive auxiliary feedwater actuation signal. The temperature of the stagnant condensate water and its surrounding tubes and piping during the reactor normal operation modes may fall to the ambient temperature. A possible concern is the introduction of saturated steam into the PAFS recirculation pipe downstream of the PCHX in the beginning of the PAFS operation. Although the steam introduction rate is expected to be slow, a rapid condensation rate is expected due to the initial cold surrounding temperature in the pipe, which could result in a localized pressure reduction and the propagation of decompression and velocity disturbances into the condensate water leg, which might cause the sudden closure of check valves and associated water hammer. Thus, it is requisite for the licensing review of the PAFS design to confirm if destructive water hammers will not be produced due to such rapid condensation induced decompressions in the system. This paper addresses an assessment of the potential local decompressions which could result from the steam

  2. Transmutation analysis considering and explicit fission product treatment based on a coupled Hammer-Technion and Cinder-2 system

    International Nuclear Information System (INIS)

    Abe, A.Y.

    1989-01-01

    This work presents a study about neutron absorption in a typical PWR cell by considering an explicit treatment for the fission products. The proposed methodology to treat fission product neutron absorption in a lattice calculation combines the HAMMER-TECHNION and CINDER-2 codes. The fission product chain treatment considers nearly 99% of all original CINDER-2 neutron absorption chain treatment. Parallel to the explicit treatment, a cross section library in the HAMMER-TECHNION code multigroup structure for the fission products was generated using the ENDF/B-V fission product library and processed by NJOY and AMPX-II processing codes. The methodology validation was investigated against two available benchmarks and it was obtained excellent results for the K-Infinity (IAEA-TECDOC-233) as function of burnup and enrichment and for the aggregate quantity sup(σ)2200 in units of barns/fission cross sections (OKAZAKI and SOKOLOWSKI). This work contributed for a better understanding of the fission product neutron absorption in a typical PWR cell and showed that the explicit fission product treatment can be successfully achieved. Besides that the performance of the ENDF/B-V fission product library was accessed. (author)

  3. An analysis of the relationship between the linear hammer speed and the thrower applied forces during the hammer throw for male and female throwers.

    Science.gov (United States)

    Brice, Sara M; Ness, Kevin F; Rosemond, Doug

    2011-09-01

    The purpose of this study was to investigate the relationship between the cable force and linear hammer speed in the hammer throw and to identify how the magnitude and direction of the cable force affects the fluctuations in linear hammer speed. Five male (height: 1.88 +/- 0.06 m; body mass: 106.23 +/- 4.83 kg) and five female (height: 1.69 +/- 0.05 m; body mass: 101.60 +/- 20.92 kg) throwers participated and were required to perform 10 throws each. The hammer's linear velocity and the cable force and its tangential component were calculated via hammer head positional data. As expected, a strong correlation was observed between decreases in the linear hammer speed and decreases in the cable force (normalised for hammer weight). A strong correlation was also found to exist between the angle by which the cable force lags the radius of rotation at its maximum (when tangential force is at its most negative) and the size of the decreases in hammer speed. These findings indicate that the most effective way to minimise the effect of the negative tangential force is to reduce the size of the lag angle.

  4. Volpentest HAMMER Federal Training Center

    Data.gov (United States)

    Federal Laboratory Consortium — HAMMER stands for Hazardous Materials Management and Emergency Response, and was named for Sam Volpentest, a long-time community leader and advocate of the Hanford...

  5. Stratified flow instability and slug formation leading to condensation-induced water hammer in a horizontal refrigerant pipe

    International Nuclear Information System (INIS)

    Samuel Martin, C.

    2005-01-01

    Full text of publication follows: An experimental apparatus was designed for the purpose of investigating the phenomenon of condensation-induced water hammer in an ammonia refrigeration system. Water hammer was initiated by introducing warm ammonia gas over static subcooled ammonia liquid placed in a horizontal 146.3 mm diameter carbon steel pipe 6.0 m in length. By means of fast response piezoelectric pressure transducers and a high speed data acquisition system rapid dynamic pressures were recorded whenever a shock event occurred. Moreover, by means of top-mounted diaphragm pressure transducers the speed of liquid slugs propagating along the pipe was determined. The occurrence of condensation induced water hammer depended upon three major variables; namely, (1) initial liquid depth, (2) liquid temperature, and (3) mass flow rate of warm gas. For given liquid depth and temperature, once the warm gas threshold conditions were exceeded shocks occurred with greater magnitude as the mass flow rate of gas input was increased. With adequate subcooling condensation-induced water hammer occurred for initial liquid depths ranging from 25% to 95% of internal pipe diameter. The threshold mass flow rate of warm gas necessary to initiate water hammer was greater as the initial liquid depth was lowered. Based upon experimental results obtained from four pressure transducers located on the top of the test pipe conditions corresponding to bridging were ascertained. For various initial liquid depths the onset of instability from stratified flow to bridging was correlated with the Taitel-Dukler instability criterion. (author)

  6. Analytical models for lower and upper bounds of the condensation-induced water hammer in long horizontal pipes

    International Nuclear Information System (INIS)

    Chun, Moon Hyun; Park, Joo Wan; Nam, Ho Yun

    1992-01-01

    Improved analytical models have been proposed that can predict the lower and upper limits of the water hammer region for given flow conditions by incorporation of recent advances made in the understanding of phenomena associated with the condensation-induced water hammer into existing methods. Present models are applicable for steam-water counterflow in a long horizontal pipe geometry. Both lower and upper bounds of the water hammer region are expressed in terms of the 'critical inlet water flow rate' as a function of axial position. Water hammer region boundaries predicted by present and typical existing models are compared for particular flow conditions of the water hammer event occurred at San Onofre Unit 1 to assess the applicability of the models examined. The result shows that present models for lower and upper bounds of the water hammer region compare favorably with the best performing existing models

  7. Investigation of the Hammer-Gamma measurement technique: A feasibility study

    International Nuclear Information System (INIS)

    Showalter, R.

    1987-05-01

    As a reconnaissance tool for the determination of the approximate extent of shallow subsurface radium contamination, various detectors were evaluated to determine the most appropriate size for use in this task. Measurements were taken in the calibration models with existing instrumentation to determine sensitivities and calibration factors. Field measurements were taken to ensure subsurface contamination could be located with the instrumentation selected. Various methods of constructing a slim and shallow borehole were investigated to determine the easiest and quickest method of inserting the detector into the ground. Based on these investigations, a prototype ''Hammer-Gamma'' system was designed, built, and tested. 7 refs., 4 figs., 4 tabs

  8. Drilling a borehole for LEP

    CERN Multimedia

    1981-01-01

    Boreholes were drilled along the earlier proposed line of the LEP tunnel under the Jura to find out the conditions likely to be encountered during the construction of the LEP tunnel (Annual Report 1981 p. 106, Fig. 10).

  9. Structural dynamics and fracture mechanics calculations of the behaviour of a DN 425 test piping system subjected to transient loading by water hammer

    International Nuclear Information System (INIS)

    Kussmaul, K.; Kobes, E.; Diem, H.; Schrammel, D.; Brosi, S.

    1994-01-01

    Within the scope of the German HDR safety programme, several tests were carried out to investigate transient pipe loading initiated by a simulated double-ended guillotine break event, and subsequent closure of a feedwater check valve (water hammer, blow-down). Numerical analyses by means of finite element programmes were performed in parallel to the experiments. Using water hammer tests of a DN 425 piping system with predamaged components, the procedure of such analyses will be demonstrated. The results are presented, beginning with structural dynamic calculations of the undamaged piping; followed by coupling of structural dynamics and fracture mechanics computations with simple flaw elements (line spring); and finishing with costly three-dimensional fracture mechanics analyses. A good description of the real piping behaviour can be made by the numerical methods, even in the case of high plastification processes. ((orig.))

  10. A new approach for evaluating water hammer including the initial state of pressurization of the installation and fluid

    Directory of Open Access Journals (Sweden)

    G. Kaless

    2016-04-01

    Full Text Available The water hammer phenomenon is well known since the 19th century, while its mathematical formulation, by means of differential equations, is due to works of researchers such us Allievi (1903 and others from the beginning of the 20th century. The equations found in the technical publications produce a strange water hammer when the initial condition is defined assuming an incompressible fluid and a rigid pipe. The correct solution requires solving the water hammer equations for the initial state. When the finite difference method is applied, the initial state is solved by means of a set of non-linear equations. A novel approach is proposed including the initial state of pressurization into the governing equations and hence simplifying the calculus of the initial conditions. Furthermore, a critical reading of the deduction of the equations is done pointing out conceptual inconsistencies and proposing corrections.

  11. Heat generated by dental implant drills during osteotomy-a review: heat generated by dental implant drills.

    Science.gov (United States)

    Mishra, Sunil Kumar; Chowdhary, Ramesh

    2014-06-01

    Osseointegration is the more stable situation and results in a high success rate of dental implants. Heat generation during rotary cutting is one of the important factors influencing the development of osseointegration. To assess the various factors related to implant drills responsible for heat generation during osteotomy. To identify suitable literature, an electronic search was performed using Medline and Pubmed database. Articles published in between 1960 to February 2013 were searched. The search is focused on heat generated by dental implant drills during osteotomy. Various factors related to implant drill such effect of number of blades; drill design, drill fatigue, drill speed and force applied during osteotomies which were responsible for heat generation were reviewed. Titles and abstracts were screened, and literature that fulfilled the inclusion criteria was selected for a full-text reading. The initial literature search resulted in 299 articles out of which only 70 articles fulfils the inclusion criteria and were included in this systematic review. Many factors related to implant drill responsible for heat generation were found. Successful preparation of an implant cavity with minimal damage to the surrounding bone depends on the avoidance of excessive temperature generation during surgical drilling. The relationship between heat generated and implant drilling osteotomy is multifactorial in nature and its complexity has not been fully studied. Lack of scientific knowledge regarding this issue still exists. Further studies should be conducted to determine the various factors which generate less heat while osteotomy such as ideal ratio of force and speed in vivo, exact time to replace a drill, ideal drill design, irrigation system, drill-bone contact area.

  12. Fundamental Research on Percussion Drilling: Improved rock mechanics analysis, advanced simulation technology, and full-scale laboratory investigations

    Energy Technology Data Exchange (ETDEWEB)

    Michael S. Bruno

    2005-12-31

    drilling tests, as well as single impact tests, have been designed and executed. Both Berea sandstone and Mancos shale samples are used. In single impact tests, three impacts are sequentially loaded at the same rock location to investigate rock response to repetitive loadings. The crater depth and width are measured as well as the displacement and force in the rod and the force in the rock. Various pressure differences across the rock-indentor interface (i.e. bore pressure minus pore pressure) are used to investigate the pressure effect on rock penetration. For hammer drilling tests, an industrial fluid hammer is used to drill under both underbalanced and overbalanced conditions. Besides calibrating the modeling tool, the data and cuttings collected from the tests indicate several other important applications. For example, different rock penetrations during single impact tests may reveal why a fluid hammer behaves differently with diverse rock types and under various pressure conditions at the hole bottom. On the other hand, the shape of the cuttings from fluid hammer tests, comparing to those from traditional rotary drilling methods, may help to identify the dominant failure mechanism that percussion drilling relies on. If so, encouraging such a failure mechanism may improve hammer performance. The project is summarized in this report. Instead of compiling the information contained in the previous quarterly or other technical reports, this report focuses on the descriptions of tasks, findings, and conclusions, as well as the efforts on promoting percussion drilling technologies to industries including site visits, presentations, and publications. As a part of the final deliveries, the 3D numerical model for rock mechanics is also attached.

  13. Project T100 -- Hazardous Materials Management and Emergency Response Training Center (HAMMER)

    International Nuclear Information System (INIS)

    Norton, C.E.

    1994-01-01

    The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design and construction of the Hazardous Materials Management and Emergency Response (HAMMER) Training Center, project 95L-EWT-100 at Hanford. The reviews and verifications will be on activities associated with design, procurement, and construction of the HAMMER project which includes, but is not limited to earthwork, placement of concrete, laying of rail, drilling of wells, water and sewer line fabrication and installation, communications systems, fire protection/detection systems, line tie-ins, building and mock-up (prop) construction, electrical, instrumentation, pump and valves and special coatings

  14. Hypothenar hammer syndrome.

    Science.gov (United States)

    Schröttle, Angelika; Czihal, Michael; Lottspeich, Christian; Kuhlencordt, Peter; Nowak, Dennis; Hoffmann, Ulrich

    2015-05-01

    The diagnosis of hypothenar hammer syndrome (HHS) should be considered in the case of hand ischemia in people who occupationally or recreationally use the hypothenar region literally as a “hammer”. Routine diagnostics should consist of physical examination including Allen’s test, acral plethysmography and duplex sonography. According to the prevailing opinion angiography remains the «gold standard test» for establishing the diagnosis of HHS. Early diagnosis allows more effective therapeutic strategies and is important to prevent long-term negative medical sequelae. Several basic principles apply to all patients, for example hand protection and smoking cessation. The optimal treatment options, particularly the indication for surgery, remain controversial due to a lack of sound data from case series or prospective randomized trials.

  15. Evaluating nuclear power plant crew performance during emergency response drills

    International Nuclear Information System (INIS)

    Rabin, D.

    1999-01-01

    The Atomic Energy Control Board (AECB) is responsible for the regulation of the health, safety and environmental consequences of nuclear activities in Canada. Recently, the Human Factors Specialists of the AECB have become involved in the assessment of emergency preparedness and emergency response at nuclear facilities. One key contribution to existing AECB methodology is the introduction of Behaviourally Anchored Rating Scales (BARS) to measure crew interaction skills during emergency response drills. This report presents results of an on-going pilot study to determine if the BARS provide a reliable and valid means of rating the key dimensions of communications, openness, task coordination and adaptability under simulated emergency circumstances. To date, the objectivity of the BARS is supported by good inter-rater reliability while the validity of the BARS is supported by the agreement between ratings of crew interaction and qualitative and quantitative observations of crew performance. (author)

  16. Parameter definition using vibration prediction software leads to significant drilling performance improvements

    Energy Technology Data Exchange (ETDEWEB)

    Amorim, Dalmo; Hanley, Chris Hanley; Fonseca, Isaac; Santos, Juliana [National Oilwell Varco, Houston TX (United States); Leite, Daltro J.; Borella, Augusto; Gozzi, Danilo [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2012-07-01

    The understanding and mitigation of downhole vibration has been a heavily researched subject in the oil industry as it results in more expensive drilling operations, as vibrations significantly diminish the amount of effective drilling energy available to the bit and generate forces that can push the bit or the Bottom Hole Assembly (BHA) off its concentric axis of rotation, producing high magnitude impacts with the borehole wall. In order to drill ahead, a sufficient amount of energy must be supplied by the rig to overcome the resistance of the drilling system, including the reactive torque of the system, drag forces, fluid pressure losses and energy dissipated by downhole vibrations, then providing the bit with the energy required to fail the rock. If the drill string enters resonant modes of vibration, not only does it decreases the amount of available energy to drill, but increases the potential for catastrophic downhole equipment and drilling bit failures. In this sense, the mitigation of downhole vibrations will result in faster, smoother, and cheaper drilling operations. A software tool using Finite Element Analysis (FEA) has been developed to provide better understanding of downhole vibration phenomena in drilling environments. The software tool calculates the response of the drilling system at various input conditions, based on the design of the wellbore along with the geometry of the Bottom Hole Assembly (BHA) and the drill string. It identifies where undesired levels of resonant vibration will be driven by certain combinations of specific drilling parameters, and also which combinations of drilling parameters will result in lower levels of vibration, so the least shocks, the highest penetration rate and the lowest cost per foot can be achieved. With the growing performance of personal computers, complex software systems modeling the drilling vibrations using FEA has been accessible to a wider audience of field users, further complimenting with real time

  17. A parametric study of condensation-induced water hammer in nuclear power plants

    International Nuclear Information System (INIS)

    Shon, Young Uk; Chun, Moon Hyun

    1990-01-01

    Condensation-induced water hammer (CIWH), which may occur in systems involving steam and water simultaneously, has a series of processes such as formation of water slug, trapping a steam cavity, depressurization due to steam condensation, accelerating slug caused pressure difference over it and final slug impact. These processes are dependent on water flow rate in a pipe, water temperature, water subcooling, steam pressure, size of slug and cavity, and heat transfer coefficient at interface between steam and water. In the present work, the prediction of conditions to initiate water hammer has been made with full scale by applying the open channel flow theory. These conditions are expressed in terms of water flow rate according to changes of steam pressure, water subcooling, and pipe diameter. Under these conditions that induce CIWH, the effect of parameters which influence on slug impact pressure and cavity collapse rate have been studied with full scale. Also, the impact loads that may be applied to piping design were evaluated under various system conditions

  18. ["Water Hammer effect": a rare mechanism of hydrocephalus].

    Science.gov (United States)

    Hage, P; El Helou, A

    2012-10-01

    We are reporting a case of functional hydrocephalus in a 66-year-old male patient presenting for gait disturbance. The etiology of the disease is a cerebrospinal fluid flow disturbance due to an ectatic basilar artery at the level of Monro foramen. Different pathophysiological mechanisms are discussed below. Copyright © 2012 Elsevier Masson SAS. All rights reserved.

  19. A Solution to Hammer's X-ray Reconstruction Problem

    DEFF Research Database (Denmark)

    Gardner, Richard J.; Kiderlen, Markus

    2007-01-01

    We propose algorithms for reconstructing a planar convex body K from possibly noisy measurements of either its parallel X-rays taken in a fixed finite set of directions or its point X-rays taken at a fixed finite set of points, in known situations that guarantee a unique solution when the data is...... to K in the Hausdorff metric as k tends to infinity. This solves, for the first time in the strongest sense, Hammer’s X-ray problem published in 1963....

  20. Hazardous Materials Management and Emergency Response (HAMMER)

    Data.gov (United States)

    Federal Laboratory Consortium — The Volpentest Hazardous Materials Management and Emergency Response (HAMMER) Federal Training Center is a safety and emergency response training center that offers...

  1. Water hammer and cavitational hammer in process plant pipe systems

    International Nuclear Information System (INIS)

    Dudlik, A.; Schoenfeld, S.B.H.; Hagemann, O.; Fahlenkamp, H.

    2003-01-01

    Fast acting valves are often applied for quick safety shut-down of pipelines for liquids and gases in the chemical and petrochemical industry as well as in power plants and state water supplies. The fast deceleration of the liquid leads to water hammer upstream the valve and to cavitational hammer downstream the fast closing valve. The valve characteristics given by manufacturers are usually measured at steady state flow conditions of the liquid. In comparison, the dynamic characteristics depend on the initial liquid velocity, valve closing velocity, the absolute pipe pressure and the pipe geometry. Fraunhofer UMSICHT conducts various test series examining valve dynamic characteristics in order of the dynamic analysis of pressure surges in fast closing processes. Therefore a test rig is used which consists of two pipelines of DN 50 and DN 100 with an approximate length of 230 m each. In this paper the results of performed pressure surge experiments with fast closing and opening valves will be compared to calculations of commercial software programs such as MONA, FLOWMASTER 2. Thus the calculation software for water supply, power plants oil and gas and chemical industry can be permanently improved. (orig.)

  2. Hydraulic lifter of a drilling unit

    Energy Technology Data Exchange (ETDEWEB)

    Velikovskiy, L S; Demin, A V; Shadchinov, L M

    1979-01-08

    The invention refers to drilling equipment, in particular, devices for lowering and lifting operations during drilling. A hydraulic lifter of the drilling unit is suggested which contains a hydraulic cylinder, pressure line and hollow plunger whose cavities are hydraulically connected. In order to improve the reliability of the hydraulic lifter by balancing the forces of compression in the plunger of the hydraulic cylinder, a closed vessel is installed inside the plunger and rigidly connected to its ends. Its cavity is hydraulically connected to the pressure line.

  3. Transient Analysis for Evaluating the Potential Boiling in the High Elevation Emergency Cooling Units of PWR Following a Hypothetical Loss of Coolant Accident (LOCA) and Subsequent Water Hammer Due to Pump Restart

    International Nuclear Information System (INIS)

    Husaini, S. Mahmood; Qashu, Riyad K.

    2004-01-01

    The Generic Letter GL-96-06 issued by the U.S. Nuclear Regulatory Commission (NRC) required the utilities to evaluate the potential for voiding in their Containment Emergency Cooling Units (ECUs) due to a hypothetical Loss Of Coolant Accident (LOCA) or a Main Steam Line Break (MSLB) accompanied by the Loss Of Offsite Power (LOOP). When the offsite power is restored, the Component Cooling Water (CCW) pumps restart causing water hammer to occur due to cavity closure. Recently EPRI (Electric Power Research Institute) performed a research study that recommended a methodology to mitigate the water hammer due to cavity closure. The EPRI methodology allows for the cushioning effects of hot steam and released air, which is not considered in the conventional water column separation analysis. The EPRI study was limited in scope to the evaluation of water hammer only and did not provide any guidance for evaluating the occurrence of boiling and the extent of voiding in the ECU piping. This paper presents a complete methodology based on first principles to evaluate the onset of boiling. Also, presented is a methodology for evaluating the extent of voiding and the water hammer resulting from cavity closure by using an existing generalized computer program that is based on the Method of Characteristics. The EPRI methodology is then used to mitigate the predicted water hammer. Thus it overcomes the inherent complications and difficulties involved in performing hand calculations for water hammer. The heat transfer analysis provides an alternative to the use of very cumbersome modeling in using CFD (computational fluid dynamics) based computer programs. (authors)

  4. Extended Reach Drilling on the example of Reelwell Drilling Method: Influence examination of different drill pipes on drilling performance on Idun field on the Norwegian Continental Shelf by PGNiG Norway AS.

    OpenAIRE

    Krol, Dariusz Pawel

    2011-01-01

    Master's thesis in Petroleum engineering Horizontal or extended reach drilling is incredibly fast growing technology. Although in some areas of the world ERD is still novelty, most of oil companies have been using the technology reliably and successfully for dozens of years. And those companies want to improve well-worn solutions to obtain better performance, thereby reducing costs. One of the main aspects that affects drilling performance and efficiency is adequate choice of drill pipe...

  5. Simulation of water hammer experiments using RELAP5 code

    International Nuclear Information System (INIS)

    Kaliatka, A.; Vaisnoras, M.

    2005-01-01

    The rapid closing or opening of a valve causes pressure transients in pipelines. The fast deceleration of the liquid results in high pressure surges upstream the valve, thus the kinetic energy is transformed into the potential energy, which leads to the temporary pressure increases. This phenomenon is called water hammer. The intensity of water hammer effects will depend upon the rate of change in the velocity or momentum. Generally water hammer can occur in any thermal-hydraulic systems and it is extremely dangerous for the thermal-hydraulic system since, if the pressure induced exceeds the pressure range of a pipe given by the manufacturer, it can lead to the failure of the pipeline integrity. Due to its potential for damage of pipes, water hammer has been a subject of study since the middle of the nineteenth century. Many theoretical and experimental investigations were performed. The experimental investigation of the water hammer tests performed at Fraunhofer Institute for Environmental, Safety and Energy Technology (UMSICHT) [1] and Cold Water Hammer experiment performed by Forschungszentrum Rossendorf (CWHTF) [2] should be mentioned. The UMSICHT facility in Oberhausen was modified in order to simulate a piping system and associated supports that are typical for a nuclear power plant [3]. The Cold water hammer experiment is interesting and instructive because it covers a wide spectrum of particularities. One of them is sub-cooled water interaction with condensing steam at the closed end of the vertical pipe at room temperature and corresponding saturation pressure [4]. In the paper, the capabilities of RELAP5 code to correctly represent the water hammer phenomenon are presented. Paper presents the comparison of RELAP5 calculated and measured at UMSICHT and CWHTF test facilities pressure transient values after the fast closure (opening) of valves. The analyses of rarefaction wave travels inside the pipe and condensation of vapour bubbles in the liquid column

  6. A cadaveric study of bone tissue temperature during pin site drilling utilizing fluoroptic thermography.

    Science.gov (United States)

    Muffly, Matthew; Winegar, Corbett; Miller, Mark Carl; Altman, Gregory

    2018-05-03

    Using fluoroptic thermography, temperature was measured during pin site drilling of intact cortical human cadaver bone with a combination of one-step drilling, graduated drilling, and one-step drilling with irrigation of 5.0 mm Schanz pins. A 1440 rpm constant force drilling was used to on tibial diaphyses while a sensor probe placed 0.5 mm adjacent to the drill hole measured temperature. Four drilling techniques on each of the tibial segments were performed: 3.5mm drill bit, 5.0mm Schanz pin, 5.0 mm Schanz pin in 3.5 mm pre-drilled entry site, 5.0 mm Schanz pin utilizing irrigation. One-step drilling using a 5.0 mm Schanz pin without irrigation produced a temperature that exceeded the threshold temperature for heat-induced injury in 5 of the 8 trials. With the other three drilling techniques, only one in24 trials produced a temperature that would result in thermal injury. This difference was found to be statistically significant (p = 0.003). The use of irrigation significantly reduced the maximum bone tissue temperature in one-step drilling of a 5.0 mm Schanz pin (p = 0.02). One-step drilling with a 3.5 mm drill bit achieved maximum temperature significantly faster than graduated drilling and drilling with irrigation using a 5.0 mm Schanz pin (p drilling with a 5.0 mm Schanz pin into cortical bone can produce temperatures that can lead to heat-induced injury. Irrigation alone can reduce the temperatures sufficiently to avoid damage. Pre-drilling can increase temperatures significantly but the extent of any injury should be small.

  7. Sensitivity analysis using contribution to sample variance plot: Application to a water hammer model

    International Nuclear Information System (INIS)

    Tarantola, S.; Kopustinskas, V.; Bolado-Lavin, R.; Kaliatka, A.; Ušpuras, E.; Vaišnoras, M.

    2012-01-01

    This paper presents “contribution to sample variance plot”, a natural extension of the “contribution to the sample mean plot”, which is a graphical tool for global sensitivity analysis originally proposed by Sinclair. These graphical tools have a great potential to display graphically sensitivity information given a generic input sample and its related model realizations. The contribution to the sample variance can be obtained at no extra computational cost, i.e. from the same points used for deriving the contribution to the sample mean and/or scatter-plots. The proposed approach effectively instructs the analyst on how to achieve a targeted reduction of the variance, by operating on the extremes of the input parameters' ranges. The approach is tested against a known benchmark for sensitivity studies, the Ishigami test function, and a numerical model simulating the behaviour of a water hammer effect in a piping system.

  8. Development of high performance drilling fluids from national products: part I; Desenvolvimento de fluidos de perfuracao de alto desempenho a partir de produtos nacionais: parte I

    Energy Technology Data Exchange (ETDEWEB)

    Farias, Kassie V.; Amorim, Luciana V. [Universidade Federal de Campina Grande (UFCG), PB (Brazil); Agencia Nacional do Petroleo (ANP), Brasilia, DF (Brazil). Programa de Recursos Humanos; Lira, Helio L. [Universidade Federal de Campina Grande (UFCG), PB (Brazil). Unidade Academica de Engenharia de Materiais

    2008-07-01

    This work has a main objective to develop formulations of high performance water-based drilling fluids composed of national additives and evaluate their rheologic, filtration and lubrication behavior. It was developed ten formulations containing the following additives: viscosity, filtered reducer, controlling of pH, hydra table clays inhibitors, anti foamy, bactericide, lubricant and sealant. The fluids were prepared according to the field practice that consists of adding to water the additives under constant agitation. After 24 h resting, it was carried out a study of the rheologic behavior, in a Fann 35 A viscosimeter, and of the filtration properties in a Fann press-filter and of lubricity in a Ofite lubricimeter through the determination of the flow curves, apparent and plastic viscosities, yield limit, gel force, filtered volume, filter-cake thickness and lubricity coefficient. The results obtained were very promising, with properties close to the standard. (author)

  9. A reagent for processing drilling muds

    Energy Technology Data Exchange (ETDEWEB)

    Polyakov, G.A.; Khon-Pak, A.T.; Khon, A.V.; Normatov, L.N.; Telegin, B.V.

    1983-01-01

    A reagent is proposed for processing drilling muds. It contains an acrylic polymer and potassium permanganate. The reagent is distinguished by the fact that in order to improve the quality of the drilling muds by increasing their salt resistance, the reagent contains hydrolized nitron fiber as the acrylic polymer with the following component relationship (in percent by weight): potassium permanganate, 0.015 to 0.065 and hydrolyzed nitron fiber, the remainder.

  10. Condensation induced water hammer. Overview and own experiments

    International Nuclear Information System (INIS)

    Dirndorfer, Stefan; Doerfler, Michael; Kulisch, Helmut; Malcherek, Andreas

    2012-01-01

    A condensation induced water hammer is a severe effect that has caused damages and even fatalities worldwide. This effect is not limited to the nuclear industry only. Generally it can occur in every pipe that contains water and steam (two-phase-flow). To date many experiments were executed to study this phenomenon and to validate existing water hammer codes. But theoretically versus measured results show a very high degree of deviation. Information about those experiments was obtained by literature review. This information is presented additionally to a test facility, which has been developed in order to generate water hammers. The test device is introduced in this paper and its main functions are briefly explained. In contrast to other experiments, water hammers at the UniBw are performed under controlled conditions. Air in water is a disruptive parameter that causes vigorous deviations between the theoretical system code and the experimental measurements. As in the test device presented in this paper, deionised water without air is used, this effect is ruled out. Furthermore the inception of a water hammer is controlled by a scientist. The experimental results will characterise the dynamic response of the test device as a function of system pressure, filling degree and sub-cooling. (orig.)

  11. Condensation-induced water hammer - overview and own experiments

    International Nuclear Information System (INIS)

    Dirndorfer, S.; Doerfler, M.; Kulisch, H.; Malcherek, A.

    2011-01-01

    A condensation induced water hammer is a severe effect that has caused damages and even fatalities worldwide. This effect is not limited to the nuclear industry only. Generally it can occur in every pipe that contains water and steam (two-phase-flow). To date many experiments were executed to study this effect and to validate existing water hammer codes. But theoretically versus measured results show a very high degree of deviation. Information about those experiments was obtained by literature review. This information is presented additionally to a test facility, which has been developed in order to generate water hammers. The test device is introduced in this paper and its main functions are briefly explained. In contrast to other experiments, water hammers at the UniBw are performed under controlled conditions. Air in water is a disruptive parameter that causes vigorous deviations between the theoretical system code and the experimental measurements. As in the test device presented in this paper, deionised water without air is used, this effect is ruled out. Furthermore the inception of a water hammer is controlled by a scientist. The experimental results will characterise the dynamic response of the test device as a function of system pressure, filling degree and sub-cooling. (author)

  12. Application of odex drilling method in a variably fractured volcanic/igneous environment

    International Nuclear Information System (INIS)

    Murphy, J.

    1992-01-01

    A case history of a subsurface investigation at a geothermal waste disposal facility within a volcanic flow regime illustrates a classic example of critical drilling problems arising from severe air and mud circulation loss. Extremely dense dacite and rhyolite rock alternating with severely fractured flow margins (interconnected with numerous voids and caverns) has provided the scenario for open-quotes gravel pilesclose quotes of substantial size between competent dacite flows. The interconnected void space at numerous depths beneath the site is great enough to create complete loss of circulation while using more than 3000 cubic feet per minute (cfm) of air at 350 pounds per square inch (psi). This initial failed effort also included the use of a foam additive. The technologies employed at this site to address the problem of circulation loss included air rotary casing hammer methods, mud rotary (with beat pulp additives and linen additives), boring wall stabilization, telescoped casing and ultimately the ODEX casing advancement system. The relative success of this seldom used method invites a discussion of the principals of the under-reamer drilling method (ODEX) and the physical limitations of the system. A practical knowledge of the advantages and disadvantages of each drilling method is necessary when designing an investigation addressing problems of soil and water contamination. Additionally, by addressing the methods that were unsuccessful, geologists, contractors and engineers can gain insight into the value and application of the various technologies available for similar drilling problems

  13. The association between self-perceived proficiency of personal protective equipment and objective performance: An observational study during a bioterrorism simulation drill.

    Science.gov (United States)

    Fogel, Itay; David, Osant; Balik, Chaya H; Eisenkraft, Arik; Poles, Lion; Shental, Omri; Kassirer, Michael; Brosh-Nissimov, Tal

    2017-11-01

    The recent Ebola virus disease outbreak emphasized the potential misuse of personal protective equipment (PPE) by health care workers (HCWs) during such an event. We aimed to compare self-perceived proficiency of PPE use and objective performance, and identify predictors of low compliance and PPE misuse. An observational study combined with subjective questionnaires were carried out during a bioterror simulation drill. Forty-two observers evaluated performance under PPE. Mistakes were recorded and graded using a structured observational format and were correlated with the subjective questionnaires and with demographic parameters. One hundred seventy-eight HCWs from community clinics and hospitals were included. The mean self-perceived proficiency was high (6.1 out of 7), mean level of comfort was moderate (4.0 out of 7), and mean objective performance was intermediate (9.5 out of 13). There was no correlation between comfort and objective performance scores. Self-perceived proficiency was in correlation with donning and continuous performance with PPE but not with doffing. Clinic personnel performed better than personnel in hospitals (40.3% vs 67.8% with 3 or more mistakes, respectively; P = .001). Demographic characteristics had no correlation with objective or self-perceived performance. Self-perceived proficiency is a poor predictor of appropriate PPE use. The results suggest poor awareness of the possibility of PPE misuse. Copyright © 2017 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  14. Water-hammer experimental set-up and water-hammer experimental study for new types of check valve applied to PWR

    International Nuclear Information System (INIS)

    Liu Hanxun.

    1985-01-01

    This paper describes a self-designed constant temperature water-hammer shock test rig with stainless steel loop in which deionized water is used as working medium. To conduct water-hammer shock simulation tests for the countercurrent phenomenon occurred in the process of shutting, stopping, parallelling and switching the coolant loops of nuclear reactor, a specially designed four-way switching valve and its pneumatic mechanism are used. Water-hammer experimental study is performed for two types of PWR's nonshock check valve with diameter of 150 mm and 200 mm simultaneously. Transient performance of the shock waves, magnitude of their peaks and durations of their fluctuation, is obtained. Some analyses for existing calculational method on water-hammer are made

  15. Development of a 1 D hybrid HTC model using CFD simulations for the analysis of direct contact condensation as the driving force for water hammers

    Energy Technology Data Exchange (ETDEWEB)

    Ceuca, Christian Sabin; Macian-Juan, Rafael [Technische Univ. Muenchen (Germany). Lehrstuhl fuer Nukleartechnik

    2013-03-15

    A Hybrid Heat Transfer Coefficient module has been developed based on two Surface Renewal Theory models using CFD simulations. The validation of the model has been done on a meso-scale computational grid for CFD simulations and on a macro-scale computational grid for System Code analysis. The CFD simulation was performed for a stratified co-current two phase flow between saturated steam and sub-cooled water while the System Code analysis was performed for a Condensation Induced Water Hammer experiment. (orig.)

  16. Usefulness of temporal bone prototype for drilling training: A prospective study.

    Science.gov (United States)

    Aussedat, C; Venail, F; Nguyen, Y; Lescanne, E; Marx, M; Bakhos, D

    2017-12-01

    Dissection of cadaveric temporal bones (TBs) is considered the gold standard for surgical training in otology. For many reasons, access to the anatomical laboratory and cadaveric TBs is difficult for some facilities. The aim of this prospective and comparative study was to evaluate the usefulness of a physical TB prototype for drilling training in residency. Prospective study. Tertiary referral centre. Thirty-four residents were included. Seventeen residents (mean age 26.7±1.6) drilled on only cadaveric TBs ("traditional" group), in the traditional training method, while seventeen residents (mean age 26.5±1.7) drilled first on a prototype and then on a cadaveric TB ("prototype" group). Drilling performance was assessed using a validated scale. Residents completed a mastoid image before and after each drilling to enable evaluation of mental representations of the mastoidectomy. No differences were observed between the groups with respect to age, drilling experience and level of residency. Regarding drilling performance, we found a significant difference across the groups, with a better score in the prototype group (P=.0007). For mental representation, the score was statistically improved (P=.0003) after drilling in both groups, suggesting that TB drilling improves the mental representation of the mastoidectomy whether prototype or cadaveric TB is used. The TB prototype improves the drilling performance and mental representation of the mastoidectomy in the young resident population. A drilling simulation with virtual or physical systems seems to be a beneficial tool to improve TB drilling. © 2017 John Wiley & Sons Ltd.

  17. Drill and Blast Performance Evaluation at the Obra Pit of Chirano ...

    African Journals Online (AJOL)

    Michael

    2016-12-02

    Dec 2, 2016 ... The methods employed included: drilling performance analysis using statistical methods; ... parameters and blasting practices were acceptable to produce good fragmentation but the actual drilling ..... the explosives was measured from the bottom of ..... Economic and Financial Evaluation, Environmental.

  18. A numerical analysis on the effect of inlet parameters for condensation induced water hammer

    Energy Technology Data Exchange (ETDEWEB)

    Datta, Priyankan [Department of Mechanical Engineering, Jadavpur University, Kolkata (India); Chakravarty, Aranyak [Department of Mechanical Engineering, Jadavpur University, Kolkata (India); School of Nuclear Studies & Application, Jadavpur University, Kolkata (India); Ghosh, Koushik, E-mail: kghosh@mech.jdvu.ac.in [Department of Mechanical Engineering, Jadavpur University, Kolkata (India); Mukhopadhyay, Achintya; Sen, Swarnendu [Department of Mechanical Engineering, Jadavpur University, Kolkata (India); Dutta, Anu; Goyal, Priyanshu [Reactor Safety Division, Bhabha Atomic Research Centre, Mumbai (India)

    2016-08-01

    Highlights: • Condensation induced water hammer phenomenon is analysed with RELAP5/Mod 3.4. • Effect of various inlet conditions on the occurrence of CIWH are investigated. • Pressure peak amplitude and location has strong dependency on water subcooling. • Superheated steam does not have significant impact on pressure amplitude. • Presence of dry saturated steam is the necessary condition for CIWH. - Abstract: Direct contact condensation (DCC) is almost an inevitable phenomenon during accidental condition for all LWRs. Rapid condensation caused by the direct contact of steam and subcooled water can lead to condensation induced water hammer (CIWH). The present work explores the underlying physics of CIWH phenomenon in a horizontal pipe under different inlet conditions such as inlet water temperature, pressure difference between steam and water section, steam superheating, steam quality and duration of valve opening using RELAP5/Mod 3.4. This work emphasises on the prediction of pressure peak magnitude in conjunction with its location of occurrence under different parametric conditions. The stratified to slug flow transition is presented in terms of the ‘flow regime map’ which is identified as the primary cause for pressure wave generation. The strongest pressure wave amplitude due to CIWH is found to be 116.6 bar for ΔP = 10 bar. Observation reveals that peak pressure location shifts towards the subcooled water injection point for higher inlet water temperature. For the lowest inlet water temperature (T{sub in} = 20 °C), the peak pressure is found at a distance of 47.5 cm away from the water inlet whereas, for the high water temperature (T{sub in} = 120 °C), peak pressure is observed at 6.25 cm away from the injection point. It is also observed that the duration of valve opening significantly affects the location of peak pressure occurrence. This study also reveals that the presence of superheated or wet steam could possibly avoid the occurrence of

  19. Performance of Partially-Hydrolyzed Polyacrylamide in Water Based Drilling Fluids

    Directory of Open Access Journals (Sweden)

    Ali Reza Nasiri*

    2013-05-01

    Full Text Available Fluid properties with constant improvement in efficiency have been noticeable as important criteria in drilling operation. The main drilling fluid properties highly depend on utilization of new polymers with high efficiency in drilling fluid composition. In this paper, the performance of a new polymer, called partially hydrolyzed polyacrylamide polymer (PHPA, is studied which has recently entered the drilling fluids industry in Iran. Hence viscosity property, fluid loss control and shale inhibition of this polymer have been evaluated based on an international standard method of API-13-I by considering the drilling and operational priorities of thecountry. Then the thermal effect, salt contaminants such as sodium chloride, calcium chloride, magnesium chloride and pH tolerance effect as major pollution indicators are also investigated in relation to polymeric fluid properties. The results obtained by the tests show that furthermore polymer PHPA increases rheological properties (apparent viscosity, plastic fluidity and yield point and it plays important role in increases in fluid loss. This polymer has also demonstrated acceptable resistance toward sodium chloride contaminants, but its efficiency decreases toward calcium and magnesium ion contaminants. The thermal tests show that polymer PHPA has high thermal stability up to 150°C. This polymer improves shale inhibition property and by encapsulation mechanism prevents dispersion of shale cuttings into the drilling fluid system as it stops any changes in fluid properties which will finally results inwellbore stability.

  20. Skalak's extended theory of water hammer

    NARCIS (Netherlands)

    Tijsseling, A.S.; Lambert, M.F.; Simpson, A.R.; Stephens, M.L.; Vítkovský, J.P.; Bergant, A.

    2008-01-01

    Half a century ago Richard Skalak [see T.C. Skalak, A dedication in memoriam of Dr. Richard Skalak, Annual Review of Biomedical Engineering 1 (1999) 1–18] published a paper with the title "An extension of the theory of water hammer" [R. Skalak, An Extension of the Theory of Water Hammer, PhD Thesis,

  1. An empirical investigation on the effects of organizational and individual factors creating conflicts on employee performance: A case study of logistics management of national Iranian drilling company

    Directory of Open Access Journals (Sweden)

    Naser Deris Soltanpour

    2014-01-01

    Full Text Available This paper presents a survey on the effects of organizational and individual factors causing conflict on employee performance of national Iranian drilling company's logistics management. It has been of descriptive type and carried out by using the random sampling method. The statistical population included all the employees of logistics management. Invariable t-test was used in this research for data analysis. The results showed that the average factors such as education, age, personal ethics, scarcity of resources, work dependence, organizational structure and organizational culture were significantly higher than the average value (3 and the average factors such as personality, evaluation structure and reward were significantly lower than the average value (3. According to the results of this survey, feeling dependence was number one priority for creating conflict followed by personal ethics, education, resources, organizational culture, age, organizational structure, evaluation and individual personality was the last item.

  2. Water Hammer Analysis using RELAP5/MOD 3.3 for Yonggwang Nuclear Power Unit 1 and 2 Blowdown System

    International Nuclear Information System (INIS)

    Lee, Sang Il; Kim, Hea Zoo; Chu, Jung Ho; Ahn, Se Hong; Jung, Chang Ho

    2010-01-01

    Water hammer can be defined as a rapid pressure step occurring in the liquid in a closed pipe caused by a sudden change in the liquid velocity. This pressure acts for a period which is twice the transit time of sonic wave in the pipe. Generally, water hammer can occur in any thermal-hydraulic systems like nuclear power plant and is extremely dangerous for nuclear power plant piping system since, if the pressure induced exceeds the pressure range of the pipe given by the manufacturer, it can lead to the failure of the piping system integrity. For Yonggwang nuclear power unit 1 and 2, water hammer occurred repeatedly on the outlet piping of regenerative heat exchanger of steam generator blowdown system. Thus, design modification was performed to prevent the water hammer and the analysis of effect on water hammer before and after design modification was performed to verify the validity of the design modification

  3. Correlation of the manual compaction hammer with mechanical hammers for the Marshall method of design for asphaltic concrete.

    Science.gov (United States)

    1964-09-01

    The purpose of this investigation was to establish, through a series of correlations, the compactive effort (number of blows) needed using the mechanical hammers to yield similar physical properties obtained with 75 blows of the manual hammer.

  4. Study of effect of in-line hydropneumatic accumulators on output characteristics of hydraulic hammer

    Science.gov (United States)

    Redelin, R. A.; Kravchenko, V. A.; Kamanin, Y. N.; Panichkin, A. V.; Bozhanov, A. A.

    2017-10-01

    The article presents the results of studies of the effect of in-line hydropneumatic accumulators on the output parameters of a hydraulic hammer during their joint operation. Based on mathematical modeling, computational experiments were performed and the output characteristics of the hammer, depending on the design and operating parameters of the in-line hydropneumatic accumulators, were obtained. It was established that for the most effective operation of the hammer, the precharge pressure of the pressure line hydropneumatic accumulator should be 70-80% of the working pressure of the hydraulic system. The utilization of a hydropneumatic accumulator without special additional devices in the discharge line is impractical.

  5. Water Hammer in Pumped Sewer Mains

    DEFF Research Database (Denmark)

    Larsen, Torben

    This publication is intended for engineers seeking an introduction to the problem of water hammer in pumped pressure mains. This is a subject of increasing interest because of the development of larger and more integrated sewer systems. Consideration of water hammer is essential for structural...

  6. 21 CFR 890.1450 - Powered reflex hammer.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Powered reflex hammer. 890.1450 Section 890.1450 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... hammer. (a) Identification. A powered reflex hammer is a motorized device intended for medical purposes...

  7. Review of two-phase water hammer

    International Nuclear Information System (INIS)

    Beuthe, T.G.

    1997-01-01

    In a thermalhydraulic system like a nuclear power plant, where steam and water mix and are used to transport large amounts of energy, there is a potential to create two-phase water hammer. Large water hammer pressure transients are a threat to piping integrity and represent an important safety concern. Such events may cause unscheduled plant down time. The objective of this review is to provide a summary of the information on two-phase water hammer available in the open literature with particular emphasis on water hammer occurrences in nuclear power plants. Past reviews concentrated on studies concerned with preventing water hammer. The present review focuses on the fundamental experimental, analytical, and modelling studies. The papers discussed here were chosen from searches covering up to July 1993. (author)

  8. Drilling Automation Tests At A Lunar/Mars Analog Site

    Science.gov (United States)

    Glass, B.; Cannon, H.; Hanagud, S.; Lee, P.; Paulsen, G.

    2006-01-01

    Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. The limited mass, energy and manpower in planetary drilling situations makes application of terrestrial drilling techniques problematic. The Drilling Automation for Mars Exploration (DAME) project is developing drilling automation and robotics for projected use in missions to the Moon and Mars in the 2011-15 period. This has been tested recently, drilling in permafrost at a lunar/martian analog site (Haughton Crater, Devon Island, Canada).

  9. Analysis of water hammer phenomena in RBMK-1500 reactor main circulation circuit

    International Nuclear Information System (INIS)

    Kaliatka, A.; Uspuras, E.; Vaisnoras, M.

    2006-01-01

    Water hammer can occur in any thermal-hydraulic systems. Water hammer can reach pressure levels far exceeding the pressure range of a pipe given by the manufacturer, and it can lead to the failure of the pipeline integrity. In the past three decades, since a large number of water hammer events occurred in the light-water- reactor power plants, a number of comprehensive studies on the phenomena associated with water hammer events have been performed. There are three basic types of severe water hammer occurring at power plants that can result in significant plant damage: rapid valve operation events; void-induced water hammer; condensation-induced water hammer. Correct prediction of water hammer transients, is therefore of paramount importance for the safe operation of the plant. Therefore verifying of computer codes capability to simulate water hammer type transients is very important issue at performing of safety analyses for nuclear power plants. Verification of RELAP5/MOD3.3 code capability to simulate water hammer type transients employing the experimental investigations is presented. Experience gained from benchmarking analyses has been used at development of the detail RELAP5 code RBMK-1500 model for simulation of water hammer effects in reactor main circulation circuit. Analysis of reactor cooling system shows, that water hammers can occur in main circulation circuit of RBMK-1500 reactor in cases of: (1) Guillotine break of the inlet piping upstream of the Group Distribution Header and (2) Guillotine break of the pressure piping upstream the Main Circulation Pump check valve. Analysis of above mentioned accident scenarios is presented in this paper. First scenario of the accident potentially is more dangerous, because the pressure pulses influence not only the reactor cooling circuit, but also the piping of safety related system (Emergency Core Cooling System pipeline) connected to affected Group Distribution Header. The performed analysis using RELAP5 code

  10. A self propelled drilling system for hard-rock, horizontal and coiled tube drilling

    Energy Technology Data Exchange (ETDEWEB)

    Biglin, D.; Wassell, M.

    1997-12-31

    Several advancements are needed to improve the efficiency and reliability of both hard rock drilling and extended reach drilling. This paper will present a Self Propelled Drilling System (SPDS) which can grip the borehole wall in order to provide a stable platform for the application of weight on bit (WOB) and resisting the reactive torque created by the downhole drilling motor, bit and formation interaction. The system will also dampen the damaging effects of drill string vibration. This tool employs two hydraulically activated anchors (front and rear) to grip the borehole wall, and a two-way thrust mandrel to apply both the drilling force to the bit, and a retraction force to pull the drill string into the hole. Forward drilling motion will commence by sequencing the anchor pistons and thrust mandrel to allow the tool to walk in a stepping motion. The SPDS has a microprocessor to control valve timing, sensing and communication functions. An optional Measurement While Drilling (MWD) interface can provide two-way communication of critical operating parameters such as hydraulic pressure and piston location. This information can then be telemetered to the surface, or used downhole to autonomously control system parameters such as anchor and thrust force or damping characteristics.

  11. Mechanisms for Triceps Surae Injury in High Performance Front Row Rugby Union Players: A Kinematic Analysis of Scrummaging Drills

    OpenAIRE

    Flavell, Carol A.; Sayers, Mark G. L.; Gordon, Susan J.; Lee, James B.

    2013-01-01

    The front row of a rugby union scrum consists of three players. The loose head prop, hooker and tight head prop. The objective of this study was to determine if known biomechanical risk factors for triceps surae muscle injury are exhibited in the lower limb of front row players during contested scrummaging. Eleven high performance front row rugby union players were landmarked bilaterally at the posterior superior iliac spine (PSIS), greater trochanter, lateral femoral epicondyle, midline of t...

  12. Drilling Experiments of Dummy Fuel Rods Using a Mock-up Drilling Device and Detail Design of Device for Drilling of Irradiated Nuclear Fuel Rods

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Yong; Lee, H. K.; Chun, Y. B.; Park, S. J.; Kim, B. G

    2007-07-15

    KAERI are developing the safety evaluation method and the analysis technology for high burn-up nuclear fuel rod that is the project, re-irradiation for re-instrumented fuel rod. That project includes insertion of a thermocouple in the center hole of PWR nuclear fuel rod with standard burn-up, 3,500{approx}4,000MWD/tU and then inspection of the nuclear fuel rod's heat performance during re-irradiation. To re-fabricate fuel rod, two devices are needed such as a drilling machine and a welding machine. The drilling machine performs grinding a center hole, 2.5 mm in diameter and 50 mm in depth, for inserting a thermocouple. And the welding machine is used to fasten a end plug on a fuel rod. Because these two equipment handle irradiated fuel rods, they are operated in hot cell blocked radioactive rays. Before inserting any device into hot cell, many tests with that machine have to be conducted. This report shows preliminary experiments for drilling a center hole on dummy of fuel rods and optimized drilling parameters to lessen operation time and damage of diamond dills. And the design method of a drilling machine for irradiated nuclear fuel rods and detail design drawings are attached.

  13. Well successfully drilled with high performance water-based fluid: Santos Basins, offshore Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Fornasier, Frank C.; Luzardo, Juan P. [Halliburton Company, Houston, TX (United States); Bishnoi, M.L. [Oil and Natural Gas Corporation Ltda. (ONGC), Dehradun (India)

    2012-07-01

    Santos Basin is a 352,260 square kilometers (136,010 sq mi) offshore pre-salt basin. It is located in the South Atlantic Ocean, some 300 kilometers (190 mi) South East of Sao Paulo, Brazil. One of the largest Brazilian sedimentary basins, it is the site of several recent significant oil fields, including Tupi and Jupiter. The criteria for drilling fluid selection is based upon the following factors: maximum cost efficiency, environmental friendliness, optimum borehole stability, and ease of use. The recommended drilling fluid formulation takes into consideration the experience gained during the drilling of wells in the Santos Basin area. The operator wanted to use a high-performance water-based fluid (HPWBF) that could provide shale inhibition, wellbore stability, lubricity and improved rate of penetration (ROP) as an alternative to synthetic-based drilling fluids to present value in terms of economics and environmental friendliness. The HPWBF consists of three synergistic products: a hydration suppressant, a dispersion suppressant, and an accretion suppressant. The system is formulated based on customized solutions for managing the clay reactivity. High logistics costs require drilling fluids that can be prepared with sea water and discharged to the sea without environmental impact. The HPWBF is a clay-free system designed for maximum shale inhibition in highly reactive formations. The system can provide wellbore stability, high rates of penetration, and acceptable rheological properties over a wide range of temperatures, with the added benefit of allowing cuttings discharge based upon water base environmental restrictions. Since no oil is used in the formulation, the HPWBF eliminates the need for cuttings processing and monitoring equipment, and exceeds the environmental requirements by achieving an LC50 value of 345,478.22 ppm in comparison with the minimum requirement (LC50 > 30,000 ppm in 96 hr), permitting use and discharge to the sea. The HPWBF selected

  14. The Performance of Corporate Alliances: Evidence from Oil and Gas Drilling in the Gulf of Mexico

    OpenAIRE

    Beshears, John Leonard

    2013-01-01

    I use data on oil and gas drilling in the Gulf of Mexico to measure how a corporate alliance—a group of firms that jointly develops an offshore tract—performs relative to a solo firm. I employ a regression discontinuity strategy based on bids in first-price sealed-bid auctions for the rights to develop leases. By focusing on leases where one organizational form narrowly outbids the other, I measure drilling outcomes while controlling for the endogenous matching of projects and organizational ...

  15. Some considerations on water-hammer and cavitation following the sudden closure of a check-valve

    International Nuclear Information System (INIS)

    Caumette, P.; Lott, M.

    1987-01-01

    The function of a no-return check-valve is to obturate a pipe when the current in it has a tendancy to revert: in normal operation the valve is maintained in open position by the flow and it closes, in case of flow-rate inversion, under the action of its own weight and of the hydrodynamic forces. At the precise time of closure, the stream most of the time is suddenly interrupted, which determines a water-hammer and the separation of a water column followed by other water-hammers. The authors analyze the movement of a swing check-valve before closure and the subsequent evolution of the fluid state

  16. Analysis of water hammer in a penstock in the case of valve closure. Part 1: Without pressure losses

    Directory of Open Access Journals (Sweden)

    Hocine HAMMOUM

    2016-04-01

    Full Text Available We develop, in this paper, a method of calculating the water hammer inspired by the graphic construction of Bergeron, which we qualify as analytical method. In helping us of these graphs, we get the relationships that allow calculating the flow rates and pressures along a penstock. The flow of water is carried out by gravity adduction connecting at upstream a storage tank and at downstream a valve. In this first part, we neglect the pressure losses. The study will focus on water hammer-induced by a slow closing of the valve. A practical example will be presented at the end of this work in order to illustrate the exposed method.

  17. Parameters affecting mechanical and thermal responses in bone drilling: A review.

    Science.gov (United States)

    Lee, JuEun; Chavez, Craig L; Park, Joorok

    2018-04-11

    Surgical bone drilling is performed variously to correct bone fractures, install prosthetics, or for therapeutic treatment. The primary concern in bone drilling is to extract donor bone sections and create receiving holes without damaging the bone tissue either mechanically or thermally. We review current results from experimental and theoretical studies to investigate the parameters related to such effects. This leads to a comprehensive understanding of the mechanical and thermal aspects of bone drilling to reduce their unwanted complications. This review examines the important bone-drilling parameters of bone structure, drill-bit geometry, operating conditions, and material evacuation, and considers the current techniques used in bone drilling. We then analyze the associated mechanical and thermal effects and their contributions to bone-drilling performance. In this review, we identify a favorable range for each parameter to reduce unwanted complications due to mechanical or thermal effects. Copyright © 2018 Elsevier Ltd. All rights reserved.

  18. Multiple performance characteristics optimization for Al 7075 on electric discharge drilling by Taguchi grey relational theory

    Science.gov (United States)

    Khanna, Rajesh; Kumar, Anish; Garg, Mohinder Pal; Singh, Ajit; Sharma, Neeraj

    2015-12-01

    Electric discharge drill machine (EDDM) is a spark erosion process to produce micro-holes in conductive materials. This process is widely used in aerospace, medical, dental and automobile industries. As for the performance evaluation of the electric discharge drilling machine, it is very necessary to study the process parameters of machine tool. In this research paper, a brass rod 2 mm diameter was selected as a tool electrode. The experiments generate output responses such as tool wear rate (TWR). The best parameters such as pulse on-time, pulse off-time and water pressure were studied for best machining characteristics. This investigation presents the use of Taguchi approach for better TWR in drilling of Al-7075. A plan of experiments, based on L27 Taguchi design method, was selected for drilling of material. Analysis of variance (ANOVA) shows the percentage contribution of the control factor in the machining of Al-7075 in EDDM. The optimal combination levels and the significant drilling parameters on TWR were obtained. The optimization results showed that the combination of maximum pulse on-time and minimum pulse off-time gives maximum MRR.

  19. Tools of Thor - more than a hammer: An overview of some analysis methods for turbulence investigation

    Science.gov (United States)

    Haaland, Stein; Vaivads, Andris; Eriksson, Elin

    2016-04-01

    In the old Norse mythology Thor was a hammer-wielding god associated with thunder and lightning. THOR is also an acronym for Turbulence Heating ObserveR - a planned space mission dedicated to stydy space plasma turbulence. Whereas the mythological Thor did most of his work with a single tool, Mjølnir - his hammer, the modern version of THOR is far more versatile. The proposed THOR spacecraft comes with a comprehensive package of instruments to explore the energy dissipation and particle energization taking place in turbulent plasma environments. This paper presents a more detailed investigation of some of the analysis methods listed in the submitted THOR proposal. To demonstrate the methods, we have used data from existing spacecraft missions like Cluster and MMS to examine and compare single-spacecraft and multi-spacecraft methods to establish proper frames. The presented analysis methods are based on fundamental plasma laws, such as conservation of mass, momentum and energy and do not require any triangulation or gradients based on multiple spacecraft. Our experience based on Cluster and MMS results show that a well equipped single spacecraft platform, like the proposed THOR mission, very often provides better and less ambiguous results that a constellation of many spacecraft with less capable instrumentation. Limitations in underlying assumptions, such as planarity and linearity, as well as non-optimal spacecraft separation and configurations often limit the possibility to utilize multi-spacecraft methods. We also investigate the role of time resolution and dynamical range of the measurements used in the methods. Since the particle instruments onboard THOR will have a much better time resolution than existing magnetospheric satellite missions, we infer that THOR will be far better suited to resolve time evolution in plasma structures. This is of particular importance in the solar wind and magnetosheat, where frame velocities can be very high. With a larger

  20. Quantifying performance on an outdoor agility drill using foot-mounted inertial measurement units.

    Directory of Open Access Journals (Sweden)

    Antonia M Zaferiou

    Full Text Available Running agility is required for many sports and other physical tasks that demand rapid changes in body direction. Quantifying agility skill remains a challenge because measuring rapid changes of direction and quantifying agility skill from those measurements are difficult to do in ways that replicate real task/game play situations. The objectives of this study were to define and to measure agility performance for a (five-cone agility drill used within a military obstacle course using data harvested from two foot-mounted inertial measurement units (IMUs. Thirty-two recreational athletes ran an agility drill while wearing two IMUs secured to the tops of their athletic shoes. The recorded acceleration and angular rates yield estimates of the trajectories, velocities and accelerations of both feet as well as an estimate of the horizontal velocity of the body mass center. Four agility performance metrics were proposed and studied including: 1 agility drill time, 2 horizontal body speed, 3 foot trajectory turning radius, and 4 tangential body acceleration. Additionally, the average horizontal ground reaction during each footfall was estimated. We hypothesized that shorter agility drill performance time would be observed with small turning radii and large tangential acceleration ranges and body speeds. Kruskal-Wallis and mean rank post-hoc statistical analyses revealed that shorter agility drill performance times were observed with smaller turning radii and larger tangential acceleration ranges and body speeds, as hypothesized. Moreover, measurements revealed the strategies that distinguish high versus low performers. Relative to low performers, high performers used sharper turns, larger changes in body speed (larger tangential acceleration ranges, and shorter duration footfalls that generated larger horizontal ground reactions during the turn phases. Overall, this study advances the use of foot-mounted IMUs to quantify agility performance in

  1. Performance of the mineral blended ester oil-based drilling fluid systems

    Energy Technology Data Exchange (ETDEWEB)

    Ismail, A.R.; Kamis, A.; Foo, K.S. [University Teknologi (Malaysia)

    2001-06-01

    A study was conducted in which the properties of ester oil-based drilling fluid systems were examined using a blended mixture of ester and synthetic mineral oil. Biodegradable invert emulsion ester-based fluids are preferred over mineral oil-based drilling fluids for environmental reasons, but they tend to cause alkaline hydrolysis resulting in solidification of the drilling fluid systems. The drilling fluid examined here consisted of Malaysian palm oil ester derivatives (methyl laureate ester or isopropyl laureate ester) blended with commercially available synthetic mineral oil. This mineral oil was added to reduce the problem of alkaline hydrolysis. This mixture, however, was found to be unstable and could not solve the problem at high temperature. The isopropyl laureate and mineral oil blended system was more stable towards the hydrolysis process up to 250 degrees F. In order to enhance the performance of an invert emulsion drilling fluid system, it was recommended that brine water content of the fluid system be lowered. 3 refs., 2 figs.

  2. Dynamic shock wave: hammer blow

    International Nuclear Information System (INIS)

    Lackme, Claude

    1978-01-01

    The general properties of shocks, their generation and the conditions of reflexion to an interface are dealt with in turn. By then applying these concepts to a liquid column and its environment (wall, free area, closing devices) the hammer blow is presented as being a relatively weak shock [fr

  3. Numerical analysis of water hammer induced by injection of subcooled water into steam flow in a horizontal pipe

    International Nuclear Information System (INIS)

    Minato, Akihiko; Nagoyoshi, Takuji; Nakamura, Akira; Fujii, Yuzo; Aya, Izuo; Yamane, Kenji

    2004-01-01

    Subcooled water injection into steam flow in piping systems may generate a water column containing a large steam slug. The steam slug collapses due to rapid condensation and interfaces on both sides collides with each other. Water hammer takes place and sharp pressure pulse propagates through the pipe. The purpose of this study is to show capability of the present numerical simulation method for predictions of pressure transient and loads on a piping system following steam slug collapse. A three-dimensional computer code for transient gas-liquid two-phase flow was applied to simulate an experiment of steam-condensation-induced water hammer with a horizontal polycarbonate pipe. The code was based on the extended two-fluid model, which treated interface motion using the VOF (Volume of Fluid) technique. The Godunov scheme of highly compressible single-phase flow was modified for application to the Riemann problem solution of gas-liquid mixture. Analysis of local steam slug collapse resulted in comparable peak pressure and pulse width of pressure transients with the observation. The calculation of pressure pulse propagation and impact load on piping system showed the quasi-steady pressure load was imposed especially on elbow at 1/10 of water hammer peak pressure. (author)

  4. Cavitating flow during water hammer using a generalized interface vaporous cavitation model

    Science.gov (United States)

    Sadafi, Mohamadhosein; Riasi, Alireza; Nourbakhsh, Seyed Ahmad

    2012-10-01

    In a transient flow simulation, column separation may occur when the calculated pressure head decreases to the saturated vapor pressure head in a computational grid. Abrupt valve closure or pump failure can result in a fast transient flow with column separation, potentially causing problems such as pipe failure, hydraulic equipment damage, cavitation or corrosion. This paper reports a numerical study of water hammer with column separation in a simple reservoir-pipeline-valve system and pumping station. The governing equations for two-phase transient flow in pipes are solved based on the method of characteristics (MOC) using a generalized interface vaporous cavitating model (GIVCM). The numerical results were compared with the experimental data for validation purposes, and the comparison indicated that the GIVCM describes the experimental results more accurately than the discrete vapor cavity model (DVCM). In particular, the GIVCM correlated better with the experimental data than the DVCM in terms of timing and pressure magnitude. The effects of geometric and hydraulic parameters on flow behavior in a pumping station with column separation were also investigated in this study.

  5. A new generation drilling rig: hydraulically powered and computer controlled

    Energy Technology Data Exchange (ETDEWEB)

    Laurent, M.; Angman, P.; Oveson, D. [Tesco Corp., Calgary, AB, (Canada)

    1999-11-01

    Development, testing and operation of a new generation of hydraulically powered and computer controlled drilling rig that incorporates a number of features that enhance functionality and productivity, is described. The rig features modular construction, a large heated common drilling machinery room, permanently-mounted draw works which, along with the permanently installed top drive, significantly reduces rig-up/rig-down time. Also featured are closed and open hydraulic systems and a unique hydraulic distribution manifold. All functions are controlled through a programmable logic controller (PLC), providing almost unlimited interlocks and calculations to increase rig safety and efficiency. Simplified diagnostic routines, remote monitoring and troubleshooting are also part of the system. To date, two rigs are in operation. Performance of both rigs has been rated as `very good`. Little or no operational problems have been experienced; downtime has averaged 0.61 per cent since August 1998 when the the first of the two rigs went into operation. The most important future application for this rig is for use with the casing drilling process which eliminates the need for drill pipe and tripping. It also reduces the drilling time lost due to unscheduled events such as reaming, fishing and taking kicks while tripping. 1 tab., 6 figs.

  6. Optimal Force Control of Vibro-Impact Systems for Autonomous Drilling Applications

    Science.gov (United States)

    Aldrich, Jack B.; Okon, Avi B.

    2012-01-01

    The need to maintain optimal energy efficiency is critical during the drilling operations performed on future and current planetary rover missions (see figure). Specifically, this innovation seeks to solve the following problem. Given a spring-loaded percussive drill driven by a voice-coil motor, one needs to determine the optimal input voltage waveform (periodic function) and the optimal hammering period that minimizes the dissipated energy, while ensuring that the hammer-to-rock impacts are made with sufficient (user-defined) impact velocity (or impact energy). To solve this problem, it was first observed that when voice-coil-actuated percussive drills are driven at high power, it is of paramount importance to ensure that the electrical current of the device remains in phase with the velocity of the hammer. Otherwise, negative work is performed and the drill experiences a loss of performance (i.e., reduced impact energy) and an increase in Joule heating (i.e., reduction in energy efficiency). This observation has motivated many drilling products to incorporate the standard bang-bang control approach for driving their percussive drills. However, the bang-bang control approach is significantly less efficient than the optimal energy-efficient control approach solved herein. To obtain this solution, the standard tools of classical optimal control theory were applied. It is worth noting that these tools inherently require the solution of a two-point boundary value problem (TPBVP), i.e., a system of differential equations where half the equations have unknown boundary conditions. Typically, the TPBVP is impossible to solve analytically for high-dimensional dynamic systems. However, for the case of the spring-loaded vibro-impactor, this approach yields the exact optimal control solution as the sum of four analytic functions whose coefficients are determined using a simple, easy-to-implement algorithm. Once the optimal control waveform is determined, it can be used

  7. WATER HAMMER OSCILLATIONS IN THE IRRIGATION FACILITIES

    Science.gov (United States)

    Kurata, Kouichi; Sasaki, Katsuhito; Makihata, Toshiaki

    In case a gate installed at the end of discharge conduit is vibrating during discharge, or an air valve is vibrating during water-filling operation into the conduit pipe between main gate and auxiliary gate, and vibration period tv is larger than tc (water hammer propagation time) that is equivalent to the phenomenon of slow closure, there is a possibility that water hammer oscillation in the discharge conduit could be induced. In this paper, by using two case examples, vibration phenomena transmitted to each part are analyzed, on the basis of water pressure fluctuation and pressure wave propagation due to occurrence of water hammer oscillation.

  8. The Effect of Venue and Wind on the Distance of a Hammer Throw

    Science.gov (United States)

    Hunter, Iain

    2005-01-01

    In track and field, gravity and air resistance act on the hammer after it has been released. Both of these forces depend on altitude and latitude. In addition, air resistance also depends on wind, temperature, humidity, and barometric pressure. Often, air resistance and varying gravity throughout the earth are not considered when throwing…

  9. Vibration and recoil control of pneumatic hammers. [by air flow pressure regulation

    Science.gov (United States)

    Constantinescu, I. N.; Darabont, A. V.

    1974-01-01

    Vibration sources are described for pneumatic hammers used in the mining industry (pick hammers), in boiler shops (riveting hammers), etc., bringing to light the fact that the principal vibration source is the variation in air pressure inside the cylinder. The present state of the art of vibration control of pneumatic hammers as it is practiced abroad, and the solutions adopted for this purpose, are discussed. A new type of pneumatic hammer with a low noise and vibration level is presented.

  10. Pushing the limits : from better bits to faster coil, companies leverage technology to ramp up onshore drilling performance

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M.

    2009-06-15

    Horizontal drilling and drilling with coiled tubing are two well drilling techniques that have steadily gained ground in the drilling industry. Most of the techniques evolved in western Canada and Alaska, but are now being successfully used south of the border. This article discussed the leveraging of technology by drilling companies in order to ramp up onshore drilling performance. Calgary-based Xtreme Coil Drilling Corp. leveraged its unique coil over top drive rigs in order to score more speed records and set new marks in both the United States Rockies and Mexico. This article also referred to other companies and their wells that have set records, including CNX Gas Corporation and the Marcellus Shale prospect; Smith International and its horizontal turbodrilling of a Pennsylvanian reservoir; and Baker Oil Tools' new rotating, self-aligning multilateral (RAM) system. For each of these examples, the article described the technology and the challenges encountered by the companies as well as the objectives of the project, and results of the drilling efforts. 2 figs.

  11. Avoiding steam-bubble-collapse-induced water hammers in piping systems

    International Nuclear Information System (INIS)

    Chou, Y.; Griffith, P.

    1989-10-01

    In terms of the frequency of occurrence, steam bubble collapse in subcooled water is the dominant initiating mechanism for water hammer events in nuclear power plants. Water hammer due to steam bubble collapse occurs when water slug forms in stratified horizontal flow, or when steam bubble is trapped at the end of the pipe. These types of water hammer events have been studied experimentally and analytically in order to develop stability maps showing those combinations of filling velocities and liquid subcooling that cause water hammer and those which don't. In developing the stability maps, experiments with different piping orientations were performed in a low pressure laboratory apparatus. Details of these experiments are described, including piping arrangement, test procedures, and test results. Visual tests using a transparent Lexan pipe are also performed to study the flow regimes accompanying the water hammer events. All analytical models were tested by comparison with the corresponding experimental results. Based on these models, and step-by-step approach for each flow geometry is presented for plant designers and engineers to follow in avoiding water hammer induced by steam bubble collapse when admitting cold water into pipes filled with steam. 37 refs., 54 figs., 2 tabs

  12. Hammering towards QED

    Directory of Open Access Journals (Sweden)

    Jasmin C. Blanchette

    2016-01-01

    Full Text Available This paper surveys the emerging methods to automate reasoning over large libraries developed with formal proof assistants. We call these methods hammers. They give the authors of formal proofs a strong "one-stroke" tool for discharging difficult lemmas without the need for careful and detailed manual programming of proof search.The main ingredients underlying this approach are efficient automatic theorem provers that can cope with hundreds of axioms, suitable translations of richer logics to their formalisms, heuristic and learning methods that select relevant facts from large libraries, and methods that reconstruct the automatically found proofs inside the proof assistants.We outline the history of these methods, explain the main issues and techniques, and show their strength on several large benchmarks. We also discuss the relation of this technology to the QED Manifesto and consider its implications for QED-style efforts.

  13. Optimum fluid design for drilling and cementing a well drilled with coil tubing technology

    Energy Technology Data Exchange (ETDEWEB)

    Swendsen, O.; Saasen, A.; Vassoy, B. [Statoil (Norway); Skogen, E.; Mackin, F.; Normann, S. H.

    1998-12-31

    The strategy, design and drilling fluid and cementing operations in the first two wells drilled with coil tubing technology in the Gullfaks field in the Tampen Spur Area of the Norwegian sector of the North Sea are discussed. The drilling fluid use was a solids-free potassium formate/polymer brine-based fluid with a density of 1,50-1.56 g/cc, with flow properties characterized by very low fluid loss due to high extensional viscosity, a low viscosity at all shear rates, and a low degree of shear-thinning. The low viscous drilling fluid is considered to have been the major contributing factor in achieving excellent hole cleaning, no differential sticking, successful setting of cement kick-off plugs, problem-free running of the liner, and excellent zonal isolation when cementing the liner. These experiences led the authors to conclude that it is possible to formulate a brine-based solids-free drilling fluid with low viscosity and fluid loss properties for most formation pressure regimes, and that such a drilling fluid is well suited to drilling highly deviated slim hole wells where hole cleaning and differential sticking present special challenges. 12 refs., 2 tabs., 3 figs.

  14. Emulsifiers performance on the stability of the drilling fluid base biodiesel; Desempenho de emulsificantes sobre a estabilidade de fluido de perfuracao a base de biodiesel

    Energy Technology Data Exchange (ETDEWEB)

    Moreira, Giselle P.; Costa, Marta [Universidade Federal do Rio Grande do Norte (UFRN), Natal, RN (Brazil)

    2008-07-01

    This work was prepared six (6) formulations of biodiesel based drilling fluids. Three formulations in the proportion oil-water 70/30 and other three in 60/40, just varying the employed surfactants: new product derived the citric acid (developed at our laboratory) and two other commercial surfactants. After production the fluids, It was analyzed them performance of the products through rheological properties to 135 deg F , filtrate volume in HPHT to 500 psi and to 200 deg F, electric stability to 135 deg F and phase separation during seven days of rest. The rheological analyses allowed to determine the behavior every fluids, though flow curves. Those fluids presented same behavior of the fluids used in oil field (Binghamianos). The laboratory tests demonstrated that new surfactant reduced the filtrated volume and provided mechanics and thermic stability. (author)

  15. FIXTURING DEVICE FOR DRILLING A STRAIGHT SHAFT

    Directory of Open Access Journals (Sweden)

    SUSAC, Florin

    2017-05-01

    Full Text Available The paper presents a fixturing device used for machining by drilling a straight shaft. The shaft was manufactured on EMCO CONCEPT TURN 55 CNC. The blank used was a bar with circular cross-section. The orientation and fixing scheme of the part and the orientation elements for fixturing device are presented as they were drawn in Autodesk Inventor and AutoCAD software.

  16. KVANE - a Kvanefjeld drill core database

    International Nuclear Information System (INIS)

    Lund Clausen, F.

    1980-01-01

    A database KVANE containing all drill core information from the drilling programme carried out in 1958, 1962, 1969 and 1977 at the uranium deposit in Kvanefjeld, Southwest Greenland has been made. The applicaTion software ''Statistical Analysis System (SAS)'' was used as the programming tool. It is shown how this software, usually used for other purposes, satisfy a demand of easy storing of larger data amounts. The paper describes how KVANE was made and organized and how data can be picked out of the database. A short introduction to the SAS system is also given. The database has been implemented at the Northern European University Computing Center (NEUCC) at the Technical University of Denmark. (author)

  17. Economic lifetime of a drilling machine:a case study on mining industry

    OpenAIRE

    Hamodi, Hussan; Lundberg, Jan; Jonsson, Adam

    2013-01-01

    Underground mines use many different types of machinery duringthe drift mining processes of drilling, charging, blasting, loading, scaling andbolting. Drilling machines play a critical role in the mineral extraction processand thus are important economically. However, as the machines age, theirefficiency and effectiveness decrease, negatively affecting productivity andprofitability and increasing total cost. Hence, the economic replacementlifetime of the machine is a key performance indicator...

  18. Water hammer in nuclear power plants

    International Nuclear Information System (INIS)

    1979-07-01

    In the past few years, licensees of operating reactors have reported a large number of water hammer events during commercial operation. Most of these events resulted in damage to piping supports and restraints. A few cases involved small cracks or ruptures in feedwater systems. As a result, in 1977 the NRC staff initiated a review of reported water hammer events and of the potential for occurrence of water hammer in all fluid systems that could have an impact on plant safety. The objectives of the review were to identify the causes of water hammer events that could affect reactor safety and to recommend further staff actions needed to reduce the likelihood of such events

  19. Investigation of water hammer in Globochica HPP

    International Nuclear Information System (INIS)

    Bergant, Anton; Saveski, Vasil; Sijamhodjic, Esad

    2004-01-01

    Water hammer should be one of the key elements of the feasibility and design studies in order to ensure safe operation of the hydroelectric power plant (HPP). The main objective of this paper is to identify critical flow regimes which may cause unacceptable water hammer in a Francis turbine HPP. Water hammer is described by the set of hyperbolic partial differential equations, the continuity equation and the equation of motion. The method of characteristics is used for solving these equations. The water turbine is treated as a boundary condition within the method of characteristics. The paper concludes with water hammer analysis in Globocica HPP, Republic of Macedonia. The system tinder consideration is fitted with two 23 MW Francis turbines. There is a reasonable agreement between the computational is field test results. (Author)

  20. Computer-Supplemented Structural Drill Practice Versus Computer-Supplemented Semantic Drill Practice by Beginning College German Students: A Comparative Experiment

    Science.gov (United States)

    1979-01-01

    610p ,/ VERSU OLEV EV, COMPUTER-SUPPLEMENTED STRUCTURAL DRILL PRACTICE OVERSUS -0MPUTER-SUPPLEMENTED SEMANTIC DRILL PRACTICE BY BEGINNING COLLGE ...refine a student’s capabilities to do specific mental/or physical performance" (p. 26). The same statement of purpose would obviously apply if the terms

  1. Surface Modification of AISI 440B Stainless Steel and its Influence on Surgical Drill Bits Performance

    Directory of Open Access Journals (Sweden)

    Łępicka M.

    2016-09-01

    Full Text Available The development of modern invasive surgery is highly dependent on the performance of surgical instruments, understood as long-term efficiency arising from high resistance to wear and corrosion. In order to maintain sufficient reliability, surgical cutting instruments are often made of martensitic stainless steels. Nevertheless, the use of ferrous alloys in medical applications is still a concern due to their questionable corrosion and wear resistance. To extend their biocompatibility, improve stability in variable environmental conditions, improve ease of handling, and maximize their performance, diffusion layers and coatings are applied to the surface. The aim of this work was to evaluate the effect of TiN and diamond-like carbon (DLC surface modification on the performance of surgical drill bits, that is, wear and corrosion resistance, measured in model and field tests. Based on the findings presented, DLC layers can be recommended as anti-wear and anti-corrosion coatings for surgical drill bits.

  2. A Probabilistic Approach for Reliability and Life Prediction of Electronics in Drilling and Evaluation Tools

    Science.gov (United States)

    2014-12-23

    while drilling (MWD) and logging while drilling ( LWD ). The OnTrak tool takes measurements like resistivity, gamma ray, pressure and vibration. (3) Bi...estimation. LVPS = Low voltage power supply LWD = Logging while drilling MaPS = Maintenance and performance system MLE = Maximum likelihood estimation...years industry experience, with prior roles in Geoscience and LWD Operations. He has a BSc in Geology from the University of South Australia, an MSc

  3. Estimation on separation efficiency of aluminum from base-cap of spent fluorescent lamp in hammer crusher unit.

    Science.gov (United States)

    Rhee, Seung-Whee

    2017-09-01

    In order to separate aluminum from the base-cap of spent fluorescent lamp (SFL), the separation efficiency of hammer crusher unit is estimated by introducing a binary separation theory. The base-cap of SFL is composed by glass fragment, binder, ferrous metal, copper and aluminum. The hammer crusher unit to recover aluminum from the base-cap consists of 3stages of hammer crusher, magnetic separator and vibrating screen. The optimal conditions of rotating speed and operating time in the hammer crusher unit are decided at each stage. At the optimal conditions, the aluminum yield and the separation efficiency of hammer crusher unit are estimated by applying a sequential binary separation theory at each stage. And the separation efficiency between hammer crusher unit and roll crush system is compared to show the performance of aluminum recovery from the base-cap of SFL. Since the separation efficiency can be increased to 99% at stage 3, from the experimental results, it is found that aluminum from the base-cap can be sufficiently recovered by the hammer crusher unit. Copyright © 2017. Published by Elsevier Ltd.

  4. Advanced Drilling through Diagnostics-White-Drilling

    International Nuclear Information System (INIS)

    FINGER, JOHN T.; GLOWKA, DAVID ANTHONY; LIVESAY, BILLY JOE; MANSURE, ARTHUR J.; PRAIRIE, MICHAEL R.

    1999-01-01

    A high-speed data link that would provide dramatically faster communication from downhole instruments to the surface and back again has the potential to revolutionize deep drilling for geothermal resources through Diagnostics-While-Drilling (DWD). Many aspects of the drilling process would significantly improve if downhole and surface data were acquired and processed in real-time at the surface, and used to guide the drilling operation. Such a closed-loop, driller-in-the-loop DWD system, would complete the loop between information and control, and greatly improve the performance of drilling systems. The main focus of this program is to demonstrate the value of real-time data for improving drilling. While high-rate transfer of down-hole data to the surface has been accomplished before, insufficient emphasis has been placed on utilization of the data to tune the drilling process to demonstrate the true merit of the concept. Consequently, there has been a lack of incentive on the part of industry to develop a simple, low-cost, effective high-speed data link. Demonstration of the benefits of DWD based on a high-speed data link will convince the drilling industry and stimulate the flow of private resources into the development of an economical high-speed data link for geothermal drilling applications. Such a downhole communication system would then make possible the development of surface data acquisition and expert systems that would greatly enhance drilling operations. Further, it would foster the development of downhole equipment that could be controlled from the surface to improve hole trajectory and drilling performance. Real-time data that would benefit drilling performance include: bit accelerations for use in controlling bit bounce and improving rock penetration rates and bit life; downhole fluid pressures for use in the management of drilling hydraulics and improved diagnosis of lost circulation and gas kicks; hole trajectory for use in reducing directional

  5. TPS-HAMMER: improving HAMMER registration algorithm by soft correspondence matching and thin-plate splines based deformation interpolation.

    Science.gov (United States)

    Wu, Guorong; Yap, Pew-Thian; Kim, Minjeong; Shen, Dinggang

    2010-02-01

    We present an improved MR brain image registration algorithm, called TPS-HAMMER, which is based on the concepts of attribute vectors and hierarchical landmark selection scheme proposed in the highly successful HAMMER registration algorithm. We demonstrate that TPS-HAMMER algorithm yields better registration accuracy, robustness, and speed over HAMMER owing to (1) the employment of soft correspondence matching and (2) the utilization of thin-plate splines (TPS) for sparse-to-dense deformation field generation. These two aspects can be integrated into a unified framework to refine the registration iteratively by alternating between soft correspondence matching and dense deformation field estimation. Compared with HAMMER, TPS-HAMMER affords several advantages: (1) unlike the Gaussian propagation mechanism employed in HAMMER, which can be slow and often leaves unreached blotches in the deformation field, the deformation interpolation in the non-landmark points can be obtained immediately with TPS in our algorithm; (2) the smoothness of deformation field is preserved due to the nice properties of TPS; (3) possible misalignments can be alleviated by allowing the matching of the landmarks with a number of possible candidate points and enforcing more exact matches in the final stages of the registration. Extensive experiments have been conducted, using the original HAMMER as a comparison baseline, to validate the merits of TPS-HAMMER. The results show that TPS-HAMMER yields significant improvement in both accuracy and speed, indicating high applicability for the clinical scenario. Copyright (c) 2009 Elsevier Inc. All rights reserved.

  6. Improvement of Drill Performance in Metal Cutting Using MoST Solid Lubricant Coatings

    Institute of Scientific and Technical Information of China (English)

    N.R. Thomas; D.G. Teer; S. Yang; S. Hickman

    2004-01-01

    Coated tools are widely used in today's metal cutting industries and have significantly improved machining productivity through reducing operation costs and time. This paper presents the results of a systematic study of the performance of HSS drills coated with CrTiAlN and drills with a top solid lubricant coating of MoSTTM. The tests were performed on a Haas vertical machining centre under wet and dry cutting conditions to machine through holes in medium carbon steel workpieces. The feed force and torque were recorded throughout some of the tests using a force dynamometer,while the tool wear was monitored and measured. It was found that MoSTTM coatings even under accelerated conditions improve the tool life significantly based on their unique properties and very low friction.

  7. A Fast Inspection of Tool Electrode and Drilling Depth in EDM Drilling by Detection Line Algorithm.

    Science.gov (United States)

    Huang, Kuo-Yi

    2008-08-21

    The purpose of this study was to develop a novel measurement method using a machine vision system. Besides using image processing techniques, the proposed system employs a detection line algorithm that detects the tool electrode length and drilling depth of a workpiece accurately and effectively. Different boundaries of areas on the tool electrode are defined: a baseline between base and normal areas, a ND-line between normal and drilling areas (accumulating carbon area), and a DD-line between drilling area and dielectric fluid droplet on the electrode tip. Accordingly, image processing techniques are employed to extract a tool electrode image, and the centroid, eigenvector, and principle axis of the tool electrode are determined. The developed detection line algorithm (DLA) is then used to detect the baseline, ND-line, and DD-line along the direction of the principle axis. Finally, the tool electrode length and drilling depth of the workpiece are estimated via detected baseline, ND-line, and DD-line. Experimental results show good accuracy and efficiency in estimation of the tool electrode length and drilling depth under different conditions. Hence, this research may provide a reference for industrial application in EDM drilling measurement.

  8. Variable Step Integration Coupled with the Method of Characteristics Solution for Water-Hammer Analysis, A Case Study

    Science.gov (United States)

    Turpin, Jason B.

    2004-01-01

    One-dimensional water-hammer modeling involves the solution of two coupled non-linear hyperbolic partial differential equations (PDEs). These equations result from applying the principles of conservation of mass and momentum to flow through a pipe, and usually the assumption that the speed at which pressure waves propagate through the pipe is constant. In order to solve these equations for the interested quantities (i.e. pressures and flow rates), they must first be converted to a system of ordinary differential equations (ODEs) by either approximating the spatial derivative terms with numerical techniques or using the Method of Characteristics (MOC). The MOC approach is ideal in that no numerical approximation errors are introduced in converting the original system of PDEs into an equivalent system of ODEs. Unfortunately this resulting system of ODEs is bound by a time step constraint so that when integrating the equations the solution can only be obtained at fixed time intervals. If the fluid system to be modeled also contains dynamic components (i.e. components that are best modeled by a system of ODEs), it may be necessary to take extremely small time steps during certain points of the model simulation in order to achieve stability and/or accuracy in the solution. Coupled together, the fixed time step constraint invoked by the MOC, and the occasional need for extremely small time steps in order to obtain stability and/or accuracy, can greatly increase simulation run times. As one solution to this problem, a method for combining variable step integration (VSI) algorithms with the MOC was developed for modeling water-hammer in systems with highly dynamic components. A case study is presented in which reverse flow through a dual-flapper check valve introduces a water-hammer event. The predicted pressure responses upstream of the check-valve are compared with test data.

  9. A novel drill design for photoacoustic guided surgeries

    Science.gov (United States)

    Shubert, Joshua; Lediju Bell, Muyinatu A.

    2018-02-01

    Fluoroscopy is currently the standard approach for image guidance of surgical drilling procedures. In addition to the harmful radiation dose to the patient and surgeon, fluoroscopy fails to visualize critical structures such as blood vessels and nerves within the drill path. Photoacoustic imaging is a well-suited imaging method to visualize these structures and it does not require harmful ionizing radiation. However, there is currently no clinical system available to deliver light to occluded drill bit tips. To address this challenge, a prototype drill was designed, built, and tested using an internal light delivery system that allows laser energy to be transferred from a stationary laser source to the tip of a spinning drill bit. Photoacoustic images were successfully obtained with the drill bit submerged in water and with the drill tip inserted into a thoracic vertebra from a human cadaver.

  10. Automatic identification of otologic drilling faults: a preliminary report.

    Science.gov (United States)

    Shen, Peng; Feng, Guodong; Cao, Tianyang; Gao, Zhiqiang; Li, Xisheng

    2009-09-01

    A preliminary study was carried out to identify parameters to characterize drilling faults when using an otologic drill under various operating conditions. An otologic drill was modified by the addition of four sensors. Under consistent conditions, the drill was used to simulate three important types of drilling faults and the captured data were analysed to extract characteristic signals. A multisensor information fusion system was designed to fuse the signals and automatically identify the faults. When identifying drilling faults, there was a high degree of repeatability and regularity, with an average recognition rate of >70%. This study shows that the variables measured change in a fashion that allows the identification of particular drilling faults, and that it is feasible to use these data to provide rapid feedback for a control system. Further experiments are being undertaken to implement such a system.

  11. Principles of selection ofdrilling mud stream volume when drilling with a stream pump

    Directory of Open Access Journals (Sweden)

    Jan Macuda

    2006-10-01

    Full Text Available The reverse mud circulation induced by a stream pump is most frequently applied for large diameter drilling. This system is treated as auxiliary in all design solutions. It is implemented to drilling wells from the surface to the depth of deposition of the preliminary column. It enables performing wells in loose sands, gravel, clays clayey shales, marls, limestones, sandstones and other sedimentary rocks.A principle of selecting a drilling mud stream volume for various bit diameters and drilling rates in loose rocks are presented in the paper. A special attention has been paid to the drop of efficiency of cuttings removal with an increasing depth of the borehole.

  12. Analysis of water hammer in a penstock in the case of valve closure. Part 2: Pressure losses concentrated downstream

    Directory of Open Access Journals (Sweden)

    Hocine HAMMOUM

    2017-06-01

    Full Text Available In our previous study (Part 1; by using the graphic of Bergeron, we have drawn the relationships which allow calculating flows and pressures at the valve and the reservoir, considering that pressure losses are negligible. Now, we assume in this second contribution that these pressure losses are concentrated downstream of the pipe, just at the entry of the valve. The study will focus on water hammer-induced by a slow closing of the valve. A practical example will be presented at the end of this work in order to illustrate the exposed method.

  13. An evaluation of water hammer in nuclear power plants

    International Nuclear Information System (INIS)

    Serkiz, A.

    1983-01-01

    Water hammer can occur as a result of to steam-void collapse, steam-driven slugs of water, pump startup into voided lines, and inadverdent closures of valves; the result is large hydraulic pressure loads. Since 1968, about 150 water hammer events have been reported in U.S. nuclear power plants; damage has been confined to pipe hangers and snubbers. The increase in reported water hammer events in the 1970s led to the designation of water hammer as Unresolved Safety Issue A-1 in 1979. Since the mid-1970s reported occurrences and their underlying phenomena have been studied, and corrective design and operational measures have been implemented. This paper presents the results of generic evaluations of water hammer occurrence and reported damage and sets forth technical findings. These findings indicate that good design practices and operational procedures can minimize the occurrence of water hammer

  14. Condensation induced water hammer safety

    International Nuclear Information System (INIS)

    Gintner, M.A.

    1997-01-01

    Condensation induced water hammer events in piping systems can cause catastrophic steam system failures which can result in equipment damage, personal injury, and even death. As an industry, we have learned to become accustomed to the ''banging'' that we often hear in our steam piping systems, and complacent in our actions to prevent it. It is unfortunate that lives are lost needlessly, as this type of water hammer event is preventable if one only applies some basic principles when operating and maintaining their steam systems. At the U. S. Department of Energy's Hanford Site where I work, there was one such accident that occurred in 1993 which took the life of a former co-worker and friend of mine. Hanford was established as part of the Manhattan Project during World War II. it is a 560 square mile complex located along the banks of the Columbia River in Southeastern Washington State. For almost 45 years, hanford's mission was to produce weapons grade plutonium for our nations defense programs. Today, Hanford no longer produces plutonium, but is focused on site clean-up and economic diversification. Hanford still uses steam for heating and processing activities, utilizing over 20 miles of piping distribution systems similar to those found in industry. Although these aging systems are still sound, they cannot stand up to the extreme pressure pulses developed by a condensation induced water hammer

  15. Condensation induced water hammer safety

    Energy Technology Data Exchange (ETDEWEB)

    Gintner, M.A.

    1997-03-10

    Condensation induced water hammer events in piping systems can cause catastrophic steam system failures which can result in equipment damage, personal injury, and even death. As an industry, we have learned to become accustomed to the ''banging'' that we often hear in our steam piping systems, and complacent in our actions to prevent it. It is unfortunate that lives are lost needlessly, as this type of water hammer event is preventable if one only applies some basic principles when operating and maintaining their steam systems. At the U. S. Department of Energy's Hanford Site where I work, there was one such accident that occurred in 1993 which took the life of a former co-worker and friend of mine. Hanford was established as part of the Manhattan Project during World War II. it is a 560 square mile complex located along the banks of the Columbia River in Southeastern Washington State. For almost 45 years, hanford's mission was to produce weapons grade plutonium for our nations defense programs. Today, Hanford no longer produces plutonium, but is focused on site clean-up and economic diversification. Hanford still uses steam for heating and processing activities, utilizing over 20 miles of piping distribution systems similar to those found in industry. Although these aging systems are still sound, they cannot stand up to the extreme pressure pulses developed by a condensation induced water hammer.

  16. Hypothenar hammer syndrome: long-term follow-up after ulnar artery reconstruction with the lateral circumflex femoral artery.

    Science.gov (United States)

    de Niet, A; Van Uchelen, J H

    2017-06-01

    In symptomatic patients with hypothenar hammer syndrome, the occluded part of the ulnar artery can be reconstructed with an autologous graft. Venous grafts are used frequently, but they are known for their low patency rate. Arterial grafts show better patency rates than venous grafts in coronary bypass surgery. We performed 11 ulnar artery reconstructions with the descending branch of the lateral circumflex femoral artery and compared these with previously performed venous reconstructions. All patients with an arterial graft reconstruction had a patent graft at a mean follow-up of 63 months. In addition, nine out of 11 patients reported improvement in their symptoms. The patency rate of venous reconstructions in hypothenar hammer syndrome is significantly lower. Arterial grafting for hypothenar hammer syndrome has superior patency compared with venous grafting; we recommend it as the surgical treatment of choice for symptomatic hypothenar hammer syndrome. 4.

  17. Automated Grid Monitoring for LHCb through HammerCloud

    CERN Multimedia

    CERN. Geneva

    2015-01-01

    The HammerCloud system is used by CERN IT to monitor the status of the Worldwide LHC Computing Grid (WLCG). HammerCloud automatically submits jobs to WLCG computing resources, closely replicating the workflow of Grid users (e.g. physicists analyzing data). This allows computation nodes and storage resources to be monitored, software to be tested (somewhat like continuous integration), and new sites to be stress tested with a heavy job load before commissioning. The HammerCloud system has been in use for ATLAS and CMS experiments for about five years. This summer's work involved porting the HammerCloud suite of tools to the LHCb experiment. The HammerCloud software runs functional tests and provides data visualizations. HammerCloud's LHCb variant is written in Python, using the Django web framework and Ganga/DIRAC for job management.

  18. Analysis of water hammer-structure interaction in piping system for a loss of coolant accident in primary loop of pressurized water reactor

    International Nuclear Information System (INIS)

    Zhang Xiwen; Yang Jinglong; He Feng; Wang Xuefang

    2000-01-01

    The conventional analysis of water hammer and dynamics response of structure in piping system is divided into two parts, and the interaction between them is neglected. The mechanism of fluid-structure interaction under the double-end break pipe in piping system is analyzed. Using the characteristics method, the numerical simulation of water hammer-structure interaction in piping system is completed based on 14 parameters and 14 partial differential equations of fluid-piping cell. The calculated results for a loss of coolant accident (LOCA) in primary loop of pressurized water reactor show that the waveform and values of pressure and force with time in piping system are different from that of non-interaction between water hammer and structure in piping system, and the former is less than the later

  19. Understanding how the placement of an asymmetric vibration damping tool within drilling while underreaming can influence performance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Kabbara, Alan; McCarthy, John; Burnett, Timm; Forster, Ian [National Oilwell Varco Downhole Ltd. (NOV), Houston, TX (United States)

    2012-07-01

    This paper describes the work, on test rigs and full-scale drilling rigs, carried out with respect to placement of an Asymmetric Vibration Damping Tool (AVDT) within drilling while under reaming operations. An AVDT, by virtue of the forward synchronous motion imposed on the drill string, offers benefits in minimizing down hole vibration-related tool failures and therefore maximizing rate of penetration (ROP). Of interest in using the AVDT is the tendency to minimize stick slip by means of the parasitic torque it generates. This is of particular importance during under reaming operations. While under reaming, stick slip can result in low (ROP) and potentially an increased incidence of down hole tool failures. The use of an AVDT in these operations has been shown to significantly reduce stick slip. However, due to the forward synchronous motion caused by the AVDT, there is the potential to cause eccentric wear to the Bottom Hole Assembly (BHA) components in the vicinity of the AVDT. If allowed to progress, this eccentric wear can cause a reduction in down hole tool life and drilling performance. Eliminating eccentric wear would be beneficial in reducing repair costs, extending component life and further improving drilling performance. To minimize eccentric wear and maximize drilling performance, the placement of the AVDT within the BHA is critical. This paper describes how the placement of intermediate stabilizers between the AVDT and the under reamer can minimize eccentric wear to the under reamer and the adjacent drill string due to the forward synchronous whirl induced by the AVDT. This approach allows the full benefits of the AVDT to be recognized while reducing the potentially damaging effects of eccentric wear to other BHA components. The work has drawn upon small-scale rig testing, full-scale testing at the Ullrigg test facility in Norway and from real-world drilling and under reaming operations in the USA. (author)

  20. Offshore wind turbine foundations. Development of a special vibratory hammer with enhanced function; Gruendung von Offshore Windenergieanlagen. Entwicklung einer speziellen Vibrationsramme mit erweiterter Funktion

    Energy Technology Data Exchange (ETDEWEB)

    Koecher, Johannes; Ulrich, Dirk [ThyssenKrupp Tiefbautechnik GmbH, Alsfeld (Germany)

    2013-11-01

    To ensure that steel jacket foundations for offshore wind turbines are securely anchored, they are fixed to the seabed by means of ''pins''. The pins consist of pipe piles weighing up to 140 metric tons, and are driven into the seabed by a vibratory hammer and then anchored by impact driving. ThyssenKrupp Tiefbautechnik has modified a vibratory hammer so that it can pick up the piles horizontally directly from the working ship or pontoon and then vibrate them vertically into the ground. This significantly reduces installation times and foundation costs. (orig.)

  1. Tesco's Bob Tessari: launching a drilling revolution

    Energy Technology Data Exchange (ETDEWEB)

    Budd, G.

    2002-07-01

    The 'Casing Drilling' technology, patented by Tesco, which allows operators to simultaneously drill, case and evaluate oil and gas wells, is described. The system is claimed to substantially reduce the amount of lost circulation, loss of well control and bore hole instability problems that have been documented to account for about 25 per cent of total rig time on a well, and at least $4 billion (or 10 per cent of the $40 billion annual global drilling tab) spent on 'unscheduled events' associated with tripping drill pipe. With the Casing Drilling process, wells are drilled using standard oilfield casing instead of drill pipe. The host of downhole problems associated with tripping in and out of the hole are avoided, as the casing pipe is never removed. Instead, drill bits and other downhole tools are tripped through the casing with wireline at a rate of about 500 ft per minute, drastically reducing tripping time. Tesco also developed the portable top drive, the manufacture and rental of which constitutes a large part of the company's business, besides helping technologically to make Casing Drilling possible. Much of the company's success is attributed to the tenacity and zest for innovative approaches of the company's CEO, Bob Tessari, who is largely responsible for the company finding itself at the centre of a drilling technology revolution.

  2. Physics-Based Pneumatic Hammer Instability Model, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Florida Turbine Technologies (FTT) proposes to conduct research necessary to develop a physics-based pneumatic hammer instability model for hydrostatic bearings...

  3. Casing drilling TM : a viable technology for coal bed methane?

    Energy Technology Data Exchange (ETDEWEB)

    Madell, G.; Muqeem, M. [Tesco Corp., Calgary, AB (Canada)

    2001-07-01

    This paper highlighted the experience that Tesco has gained by drilling more than 30 wells using only casings as the drill stem, suggesting that such technology could be advantageous for Coal Bed Methane (CBM) exploration and development. Tesco has manufactured a mobile and compact hydraulic drilling rig that is ideal to meet the great demand for CBM development in Canada. The Casing Drilling TM system, when used in conjunction with the drilling rig, could be very effective and efficient for exploration and development of CBM reserves which typically require extensive coring. Continuous coring while drilling ahead and wire line retrieval can offer time savings and quick core recovery of large diameter core required for exploration core desorption tests. The proposed system may also have the potential to core or drill typically tight gas sands or coal beds under balanced with air or foam. This would reduce drilling fluid damage while finding gas at the same time. Compared to conventional drill pipes, Casing Drilling TM could also be effective with water production from shallow sands because of the smaller annual clearance which requires less air volumes to lift any produced water. 8 refs., 3 tabs., 9 figs.

  4. Graphene nanoplatelets as high-performance filtration control material in water-based drilling fluids

    Science.gov (United States)

    Ridha, Syahrir; Ibrahim, Arif; Shahari, Radzi; Fonna, Syarizal

    2018-05-01

    The main objective of this work is to evaluate the effectiveness of graphene nanoplatelets (GNP) as filtration control materials in water based drilling fluids. Three (3) general samples of water based drilling fluids were prepared including basic potassium chloride (KCl) drilling fluids, nanosilica (NS) drilling fluids and GNP drilling fluids. Several concentrations of NS and GNP were dispersed in controlled formulations of water based drilling fluids. Standard API filtration tests were carried out for comparison purposes as well as High Temperature High Pressure (HTHP) filtration tests at 150 °F (∼66 °C), 250 °F (∼121 °C) and 350 °F (∼177 °C) at a fixed 500 (∼3.45MPa) psi to study the filtration trend as a function of temperature. Mud cake samples from several tests were selectively chosen and analyzed under Field Emission Scanning Electron Microscope (FESEM) for its morphology. Results from this work show that nanoparticle concentrations play a factor in filtration ability of colloid materials in water based drilling fluids when studied at elevated temperature. Low temperature filtration, however, shows only small differences in volume in all the drilling fluid samples. 0.1 ppb concentrations of GNP reduced the fluid loss of 350 °F by 4.6 mL as compared to the similar concentration of NS drilling fluids.

  5. Modeling Friction Performance of Drill String Torsional Oscillation Using Dynamic Friction Model

    Directory of Open Access Journals (Sweden)

    Xingming Wang

    2017-01-01

    Full Text Available Drill string torsional and longitudinal oscillation can significantly reduce axial drag in horizontal drilling. An improved theoretical model for the analysis of the frictional force was proposed based on microscopic contact deformation theory and a bristle model. The established model, an improved dynamic friction model established for drill strings in a wellbore, was used to determine the relationship of friction force changes and the drill string torsional vibration. The model results were in good agreement with the experimental data, verifying the accuracy of the established model. The analysis of the influence of drilling mud properties indicated that there is an approximately linear relationship between the axial friction force and dynamic shear and viscosity. The influence of drill string torsional oscillation on the axial friction force is discussed. The results indicated that the drill string transverse velocity is a prerequisite for reducing axial friction. In addition, low amplitude of torsional vibration speed can significantly reduce axial friction. Then, increasing the amplitude of transverse vibration speed, the effect of axial reduction is not significant. In addition, by involving general field drilling parameters, this model can accurately describe the friction behavior and quantitatively predict the frictional resistance in horizontal drilling.

  6. Long-term follow-up of hypothenar hammer syndrome: a series of 47 patients.

    Science.gov (United States)

    Marie, Isabelle; Hervé, Fabien; Primard, Etienne; Cailleux, Nicole; Levesque, Hervé

    2007-11-01

    Hypothenar hammer syndrome (HHS) is an uncommon form of secondary Raynaud phenomenon, occurring mainly in subjects who use the hypothenar part of the hand as a hammer; the hook of the hamate strikes the superficial palmar branch of the ulnar artery in the Guyon space, leading to occlusion and/or aneurysm of the ulnar artery. In patients with HHS, such injuries of the palmar ulnar artery may lead to severe vascular insufficiency in the hand with occlusion of digital artery. To date, only a few series have analyzed the long-term outcome of patients with HHS. This prompted us to conduct the current retrospective study to 1) evaluate the prevalence of HHS in patients with Raynaud phenomenon and 2) assess the short-term and long-term outcome in patients with HHS. From 1990 to 2006, 4148 consecutive patients were referred to the Department of Internal Medicine at the University of Rouen medical center for evaluation of Raynaud phenomenon using nailfold capillaroscopy. HHS was diagnosed in 47 of these 4148 patients (1.13% of cases).Forty-three patients (91.5%) had occupational exposure to repetitive palmar trauma. The more common occupations were factory worker (21.3%), mason (12.8%), carpenter (10.6%), and metal worker (10.6%); the mean duration of occupational exposure to repetitive palmar trauma at HHS diagnosis was 21 years. One patient (2.1%) had recreational exposure (aikido training) to repetitive trauma of the palmar ulnar artery, and 3 other patients (6.4%) developed HHS related to a single direct injury to the hypothenar area. Clinical manifestations were more often unilateral (87.2%) involving the dominant hand (93%). HHS complications included digital ischemic symptoms (ischemia: n = 21, necrosis: n = 20) and irritation of the sensory branch of the ulnar nerve (n = 11). In HHS patients, angiography demonstrated occlusion of the ulnar artery in the area of the Guyon space (59.6%), aneurysm of the ulnar artery in the area of the Guyon space (40.4%), and embolic

  7. Water hammer and its effect on ageing: an analytical study

    International Nuclear Information System (INIS)

    Kedia, Suruchi

    2006-01-01

    Water hammer can be disastrous from the point of view of ageing of the pipe(s)/Piping system. Design of restraints and protection devices for the various piping systems must consider severe stresses that may generate because of fluid transients. These fluid transients are termed as water hammer when it is restricted to water. But to have limited margins on the stress loads of piping system it is very important to predict the actual dimensions of the stresses. This paper covers various causes and analyses of the situations under which water hammer waves get generated and also way(s) to have control on occurrences of such situations. Few case studies are also covered showing the results and graphs of the stress waves generated because of water hammer. Effort has also been made in the paper in the direction to find out the methodology to compute the ageing of the system because of water hammer waves. Further in this paper an attempt is made to show the systematic methodology towards the diagnosis of water hammer that can be treated as a foundation stone for the creation of water hammer diagnosis system. Active measures to minimize the water hammer intensity by influencing fluid dynamic conditions of the system will also be suggested. Finally the paper will present the ageing aspects because of the stresses that generate due to water hammer. (author)

  8. Surveillance procedure for the rotary drilling operations of a well

    Energy Technology Data Exchange (ETDEWEB)

    Peltier, B; Deshais, R

    1988-06-17

    A surveillance procedure for the rotary drilling operations of a well is proposed. When the drilling pipe is drawn out of the well, or put into the well, pipe elements are taken away or added. At each moment the height of the trepan in the well is measured, together with the traction force of the lifting engine. The device permits to avoid the important damage that can be caused by an error on the drilling pipe's length.

  9. Surveillance procedure for the rotary drilling operations of a well

    Energy Technology Data Exchange (ETDEWEB)

    Peltier, B.; Deshais, R.

    1988-06-17

    A surveillance procedure for the rotary drilling operations of a well is proposed. When the drilling pipe is drawn out of the well, or put into the well, pipe elements are taken away or added. At each moment the height of the trepan in the well is measured, together with the traction force of the lifting engine. The device permits to avoid the important damage that can be caused by an error on the drilling pipe's length.

  10. Water hammer conservatisms

    International Nuclear Information System (INIS)

    Uffer, R.A.

    1993-01-01

    Calculated water hammer forces often contain excessive conservatisms resulting in unrealistic damage predictions. This is especially true for void filling and column separation scenarios. Pressure rise times can be as important as pressure amplitudes. Forces based on in situ test data can also contain excessive conservatisms. This paper discusses the causes of such conservatisms and means of minimizing them

  11. The Velvet Hammer

    Science.gov (United States)

    Henderson, Nancy

    2008-01-01

    This article features the life of Louise Underwood, an advocate for people with disabilities and their families. Underwood is known for her nickname "The Velvet Hammer" because of her relentless attitude when it comes to advocating for people with disabilities. Many times she has pulled strings to halt legislation that would have…

  12. Status Report A Review of Slimhole Drilling

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Tao; Carroll, Herbert B.

    1994-09-01

    This 1994 report reviews the various applications of slimhole technology including for exploration in remote areas, low-cost development wells, reentering existing wells, and horizontal and multilateral drilling. Advantages of slimholes to regular holes are presented. Limitations and disadvantages of slimholes are also discussed. In 1994, slimhole drilling was still an ongoing development technology. (DJE 2005)

  13. Casing drilling

    Energy Technology Data Exchange (ETDEWEB)

    Heenan, D. [Tesco Corp., Calgary, AB (Canada)

    2003-07-01

    This paper reviewed the experience that Tesco has gained by drilling several wells using only casings as the drill stem. Tesco has manufactured a mobile and compact hydraulic drilling rig called the Casing Drilling {sup TM} system. The system could be very effective and efficient for exploration and development of coalbed methane (CBM) reserves which typically require extensive coring. Continuous coring while drilling ahead, along wire line retrieval, can offer time savings and quick core recovery of large diameter core which is typically required for exploration core desorption tests. The proposed system may also have the potential to core or drill typically tight gas sands or underbalanced wells with air or foam. This would reduce drilling fluid damage while simultaneously finding gas. Compared to conventional drill pipes, Casing Drilling {sup TM} could also be effective with water production from shallow sands because of the smaller annual clearance which requires less air volumes to lift any produced water. 9 figs.

  14. Uncertainty and sensitivity analysis of parameters affecting water hammer pressure wave behaviour

    International Nuclear Information System (INIS)

    Kaliatka, A.; Uspuras, E.; Vaisnoras, M.

    2006-01-01

    Pressure surges occurring in pipeline systems may be caused by fast control interference, start up and shut down processes and operation failure. They lead to water hammer upstream the closing valve and cavitational hammer downstream the valve, which may cause considerable damages to the pipeline and the support structures. Appearance of water hammer in thermal-hydraulic systems was widely studied employing different state-of-the-art thermal-hydraulic codes in many organizations. For the analysis water hammer test performed at Fraunhofer Institute for Environmental, Safety and Energy Technology (UMSICHT) at Oberhausen was considered. This paper presents the comparison of UMSICHT test facility experiment calculations employing the best estimate system code RELAP5/Mod3.3 to measured water hammer values after fast closure of a valve. The analysis revealed that the calculated first pressure peak, which has the highest value, matches the measured value very well. The performed analysis (as well as any other analyses) as a results of each individual calculation always contains uncertainty owing to initial conditions of installations, errors of measuring systems, errors caused by nodalization of objects at modelling, code correlations, etc. In this connection, results of uncertainty and sensitivity analysis of the initial conditions and code-selected models are shown in the paper. (orig.)

  15. A Review of the Evaluation, Control, and Application Technologies for Drill String Vibrations and Shocks in Oil and Gas Well

    Directory of Open Access Journals (Sweden)

    Guangjian Dong

    2016-01-01

    Full Text Available Drill string vibrations and shocks (V&S can limit the optimization of drilling performance, which is a key problem for trajectory optimizing, wellbore design, increasing drill tools life, rate of penetration, and intelligent drilling. The directional wells and other special trajectory drilling technologies are often used in deep water, deep well, hard rock, and brittle shale formations. In drilling these complex wells, the cost caused by V&S increases. According to past theories, indoor experiments, and field studies, the relations among ten kinds of V&S, which contain basic forms, response frequency, and amplitude, are summarized and discussed. Two evaluation methods are compared systematically, such as theoretical and measurement methods. Typical vibration measurement tools are investigated and discussed. The control technologies for drill string V&S are divided into passive control, active control, and semiactive control. Key methods for and critical equipment of three control types are compared. Based on the past development, a controlling program of drill string V&S is devised. Application technologies of the drill string V&S are discussed, such as improving the rate of penetration, controlling borehole trajectory, finding source of seismic while drilling, and reducing the friction of drill string. Related discussions and recommendations for evaluating, controlling, and applying the drill string V&S are made.

  16. Offshore drilling effects in Brazilian SE marine sediments: a meta-analytical approach.

    Science.gov (United States)

    Dore, Marina Pereira; Farias, Cássia; Hamacher, Cláudia

    2017-01-01

    The exploration and production of oil and gas reserves often result to drill cutting accumulations on the seafloor adjacent to drill locations. In this study, the detection of drilling influence on marine sediments was performed by meta-analytical comparison between data from pre- and post-drilling surveys undertaken in offshore Campos Basin, southeast of Brazil. Besides this overall appraisal on the geochemical variables, a multivariate assessment, considering only the post-drilling data, was performed. Among the variables, fines content, carbonates, total organic carbon, barium, chromium, copper, iron, manganese, nickel, lead, vanadium, zinc, and total petroleum hydrocarbons, only barium, copper, and hydrocarbons were related to drilling impacts. In relation to the point of discharge, relative elevated levels in the post-drilling campaigns were observed preferentially up to 500 m in the northeast and southwest directions, associated to the Brazil Current-predominant direction. Other distributed concentrations in the surroundings seem to indicate the dilution and dispersion of drilling waste promoted by meteoceanographic factors.

  17. Design of a Pneumatic Tool for Manual Drilling Operations in Confined Spaces

    Science.gov (United States)

    Janicki, Benjamin

    This master's thesis describes the design process and testing results for a pneumatically actuated, manually-operated tool for confined space drilling operations. The purpose of this device is to back-drill pilot holes inside a commercial airplane wing. It is lightweight, and a "locator pin" enables the operator to align the drill over a pilot hole. A suction pad stabilizes the system, and an air motor and flexible drive shaft power the drill. Two testing procedures were performed to determine the practicality of this prototype. The first was the "offset drill test", which qualified the exit hole position error due to an initial position error relative to the original pilot hole. The results displayed a linear relationship, and it was determined that position errors of less than .060" would prevent the need for rework, with errors of up to .030" considered acceptable. For the second test, a series of holes were drilled with the pneumatic tool and analyzed for position error, diameter range, and cycle time. The position errors and hole diameter range were within the allowed tolerances. The average cycle time was 45 seconds, 73 percent of which was for drilling the hole, and 27 percent of which was for positioning the device. Recommended improvements are discussed in the conclusion, and include a more durable flexible drive shaft, a damper for drill feed control, and a more stable locator pin.

  18. Ergonomic exposure on a drilling rig

    DEFF Research Database (Denmark)

    Jensen, Carsten; Jensen, Chris

    . In a relatively old study on American drilling rigs it was indicated that lower back problems was a frequent cause of absence (Clemmer et al. 1991). Most of the incidents causing lower back injuries were associated with heavy lifting or pushing/pulling objects by roustabouts, floorhands, derrickmen and welders......, but for some of the most frequent problems, such as musculoskeletal problems, it is difficult to determine whether the causes are work‐related or not. As manual handling (lifting, pushing, etc.) in awkward body postures increase the risk of developing musculoskeletal disorders, it should be expected that work......‐related health problems contribute to sickness absence in the offshore industry, if these working postures are common. However, also work‐related psychosocial factors, personal factors and other factors may contribute to the development of lower back disorders, which often have a multifactorial background...

  19. A contribution to water hammer analysis in pumped-storage power plants; Ein Beitrag zur Druckstossberechnung von Pumpspeicheranlagen

    Energy Technology Data Exchange (ETDEWEB)

    Hoeller, Stefan; Jaberg, Helmut [TU Graz (Austria). Inst. fuer Hydraulische Stroemungsmaschinen

    2013-03-01

    The operation of pumped-storage power plants induces a highly transient fluid flow in the penstock of high head water power plants. In the planning phase a reliable prediction of the transient plant behaviour in unsteady load cases such as e.g. machine start or switching load cases is necessary. Numerical simulation methods provide a tool to calculate the occurring pressure pulsations or mass oscillations as well as for the optimization of the transient behaviour. Commercial software-packages for water hammer simulations usually do not provide numerical models for a realistic calculation of complex components like surge tanks, turbines or emergency closing valves in a high head water power plant. But especially these components need to be modelled correctly in order to get a significant and reliable solution. This article shows the practice ofthe development of a custom-designed numerical model on the example of a pump turbine. (orig.)

  20. Resonant acoustic transducer system for a well drilling string

    Science.gov (United States)

    Nardi, Anthony P.

    1981-01-01

    For use in transmitting acoustic waves propated along a well drilling string, a piezoelectric transducer is provided operating in the relatively low loss acoustic propagation range of the well drilling string. The efficiently coupled transmitting transducer incorporates a mass-spring-piezoelectric transmitter combination permitting a resonant operation in the desired low frequency range.

  1. Salton Sea Scientific Drilling Project: A summary of drilling and engineering activities and scientific results

    Energy Technology Data Exchange (ETDEWEB)

    Ross, H.P.; Forsgren, C.K. (eds.)

    1992-04-01

    The Salton Sea Scientific g Project (SSSDP) completed the first major well in the United States Continental Scientific Drilling Program. The well (State 2-14) was drilled to 10,W ft (3,220 m) in the Salton Sea Geothermal Field in California's Imperial Valley, to permit scientific study of a deep, high-temperature portion of an active geothermal system. The program was designed to investigate, through drilling and testing, the subsurface thermal, chemical, and mineralogical environments of this geothermal area. Extensive samples and data, including cores, cuttings, geothermal fluids and gases, and geophysical logs, were collected for future scientific analysis, interpretation, and publication. Short duration flow tests were conducted on reservoirs at a depth of approximately 6,120 ft (1,865 m) and at 10,136 ft (3,089 m). This report summarizes all major activities of the SSSDP, from project inception in the fall of 1984 through brine-pond cleanup and site restoration, ending in February 1989. This report presents a balanced summary of drilling, coring, logging, and flow-test operations, and a brief summary of technical and scientific results. Frequent reference is made to original records, data, and publication of results. The report also reviews the proposed versus the final well design, and operational summaries, such as the bit record, the casing and cementing program, and the coring program. Summaries are and the results of three flow tests. Several teamed during the project.

  2. Electromagnetic hammer removes weld distortions from aluminum tanks

    Science.gov (United States)

    Schwinghamer, R. J.

    1965-01-01

    Distortions around weld areas on sheet-aluminum tanks and other structures are removed with a portable electromagnetic hammer. The hammer incorporates a coil that generates a controlled high-energy pulsed magnetic field over localized areas on the metal surface.

  3. Experiments of condensation-induced water hammers at the UniBw Munich

    International Nuclear Information System (INIS)

    Dirndorfer, Stefan; Kulisch, Helmut; Malcherek, Andreas

    2013-01-01

    Condensation-induced water hammers belong to the most serious and complex pressure surges. Experimental data from literature are scanty, incomplete, not public or simply missing. A new test facility at the UniBw (University of the German Armed Forces) was constructed to perform own experiments within a research alliance. This new test facility uses a complete new approach. In contrast to other test stations, the UniBw water hammer test facility is a closed system. This leads on the one hand to a more complex handling with respect of conducting experiments but on the other hand also to a more realistic characterization of thermo-hydraulic phenomena which can occur in a power plant. The first results of a measured condensation-induced water hammer are presented. (orig.)

  4. Experiments of condensation-induced water hammers at the UniBw Munich

    Energy Technology Data Exchange (ETDEWEB)

    Dirndorfer, Stefan; Kulisch, Helmut; Malcherek, Andreas [Universitaet der Bundeswehr Muenchen, Neubiberg (Germany). Hydromechanik und Wasserbau

    2013-03-15

    Condensation-induced water hammers belong to the most serious and complex pressure surges. Experimental data from literature are scanty, incomplete, not public or simply missing. A new test facility at the UniBw (University of the German Armed Forces) was constructed to perform own experiments within a research alliance. This new test facility uses a complete new approach. In contrast to other test stations, the UniBw water hammer test facility is a closed system. This leads on the one hand to a more complex handling with respect of conducting experiments but on the other hand also to a more realistic characterization of thermo-hydraulic phenomena which can occur in a power plant. The first results of a measured condensation-induced water hammer are presented. (orig.)

  5. Development of a Mine Rescue Drilling System (MRDS)

    Energy Technology Data Exchange (ETDEWEB)

    Raymond, David W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gaither, Katherine N. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Polsky, Yarom [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Knudsen, Steven D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Broome, Scott Thomas [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Su, Jiann-Cherng [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Blankenship, Douglas A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Costin, Laurence S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-06-01

    Sandia National Laboratories (Sandia) has a long history in developing compact, mobile, very high-speed drilling systems and this technology could be applied to increasing the rate at which boreholes are drilled during a mine accident response. The present study reviews current technical approaches, primarily based on technology developed under other programs, analyzes mine rescue specific requirements to develop a conceptual mine rescue drilling approach, and finally, proposes development of a phased mine rescue drilling system (MRDS) that accomplishes (1) development of rapid drilling MRDS equipment; (2) structuring improved web communication through the Mine Safety & Health Administration (MSHA) web site; (3) development of an improved protocol for employment of existing drilling technology in emergencies; (4) deployment of advanced technologies to complement mine rescue drilling operations during emergency events; and (5) preliminary discussion of potential future technology development of specialized MRDS equipment. This phased approach allows for rapid fielding of a basic system for improved rescue drilling, with the ability to improve the system over time at a reasonable cost.

  6. Skull wounds linked with blunt trauma (hammer example). A report of two depressed skull fractures--elements of biomechanical explanation.

    Science.gov (United States)

    Delannoy, Yann; Becart, Anne; Colard, Thomas; Delille, Rémi; Tournel, Gilles; Hedouin, Valéry; Gosset, Didier

    2012-09-01

    The lesions of the skull following perforating traumas can create complex fractures. The blunt traumas can, according to the swiftness and the shape of the object used, create a depressed fracture. The authors describe through two clinical cases the lesional characteristic of the blunt traumas, perforating the skull using a hammer. In both cases the cranial lesions were very typical: they were geometrical, square shaped, of the same size than the tool (head and tip of the hammer). On the outer table of the skull, the edges of the wounds were sharp and regular. On the inner table, the edges of the wounds were beveled and irregular. The bony penetration in the depressed fracture results from a rupture of the outer table of the bone under tension, in periphery, by the bend of the bone to the impact (outbending) and then, from the inner table with comminuted bony fragmentation. Breeding on the fractures of the size and the shape of the blunt objects used is inconstant and differs, that it is the objects of flat surface or wide in opposition to those of small surface area. Fractures morphologies depend on one hand on these extrinsic factors and on the other hand, of intrinsic factors (structure of the bone). To identify them, we had previously conducted experimental work on cranial bone samples. The bone was submitted to a device for three-point bending. This work had shown properties of thickness and stiffness of the various areas of the vault. Our cases are consistent with these results and illustrate the variability of bone lesions according to region and mode of use of blunt weapons. Many studies have identified criteria for identification of the weapons and the assistance of digital and biomechanical models will be an invaluable contribution with this aim in the future. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  7. Simulating water hammer with corrective smoothed particle method

    NARCIS (Netherlands)

    Hou, Q.; Kruisbrink, A.C.H.; Tijsseling, A.S.; Keramat, A.

    2012-01-01

    The corrective smoothed particle method (CSPM) is used to simulate water hammer. The spatial derivatives in the water-hammer equations are approximated by a corrective kernel estimate. For the temporal derivatives, the Euler-forward time integration algorithm is employed. The CSPM results are in

  8. Drilling unit

    Energy Technology Data Exchange (ETDEWEB)

    Umanchik, N P; Demin, A V; Khrustalev, N N; Linnik, G N; Lovchev, S V; Rozin, M M; Sidorov, R V; Sokolov, S I; Tsaregradskiy, Yu P

    1981-01-01

    A drilling unit is proposed which includes a hydraulic lifter, hydraulic multiple-cylinder pump with valve distribution and sectional drilling pump with separators of the working and flushing fluid. In order to reduce metal consumption and the overall dimensions of the drilling unit, the working cavity of each cylinder of the hydraulic multiple-cylinder pump is equipped with suction and injection valves and is hydraulically connected to the working cavity by one of the sections of the drilling pump.

  9. Treatment of Rigid Hammer-Toe Deformity: Permanent Versus Removable Implant Selection.

    Science.gov (United States)

    Doty, Jesse F; Fogleman, Jason A

    2018-03-01

    Hammer-toe deformities that fail nonoperative treatment can be successfully addressed with proximal interphalangeal joint resection arthroplasty or fusion. The goal of surgery is to eliminate the deformity and rigidly fix the toe in a well-aligned position. Hammer-toe correction procedures can be performed with temporary Kirschner wire (K-wire) fixation for 3 to 6 weeks with high success rates. Pain relief with successful hammer-toe correction approaches 90%; patient satisfaction rates approximate 84%. Although complication rates are rare in most series, there remains a concern regarding exposed temporary K-wire fixation, which has led to the development of multiple permanent internal fixation options. Copyright © 2017 Elsevier Inc. All rights reserved.

  10. CT-guided radiofrequency ablation of osteoid osteoma using a novel battery-powered drill

    Energy Technology Data Exchange (ETDEWEB)

    Schnapauff, Dirk; Streitparth, Florian; Wieners, Gero; Collettini, Federico; Hamm, Bernd; Gebauer, Bernhard [Charite Universitaetsmedizin Berlin, Department of Radiology, Berlin (Germany); Joehrens, Korinna [Charite Universitaetsmedizin Berlin, Department of Pathology, Berlin (Germany)

    2015-05-01

    To evaluate the use of a novel battery-powered drill, enabling specimen requirement while drilling, in radiofrequency ablation of osteoid osteoma as an alternative to conventional orthopedic drills. Between 2009 and 2013, altogether 33 patients underwent CT-guided radiofrequency ablation of an osteoid osteoma at our institution. To access the nidus of the clinically and radiologically suspected osteoid osteoma, a channel was drilled using the OnControl Bone Marrow Biopsy System (OBM, Arrow OnControl, Teleflex, Shavano Park, TX, USA) and a biopsy was taken. Procedure time (i.e., drilling including local anesthesia), amount of scans (i.e., single-shot fluoroscopy), radiation exposure, and the results of biopsy were investigated and compared retrospectively to a classical approach using either a manual bone biopsy system or a conventional orthopedic drill (n = 10) after ethical review board approval. Drilling the tract into the nidus was performed without problems in 22 of the 23 OBM cases. Median procedure time was 7 min compared to 13 min using the classical approach (p < 0.001). Median amount CT scans, performed to control correct positioning of the drill was comparable with 26 compared to 24.5 (p = NS) scans. Histologically, the diagnosis of osteoid osteomas could be determined in all 17 cases where a biopsy was taken. Radiofrequency ablation could be performed without problems in any case. The use of the battery-powered drill was feasible and facilitated the access to the osteoid osteoma's nidus offering the possibility to extract a specimen in the same step. (orig.)

  11. Unusual Cases of Hypothenar Hammer Syndrome.

    Science.gov (United States)

    Orrapin, Saranat; Arworn, Supapong; Wisetborisut, Anawat

    2015-01-01

    Hypothenar hammer syndrome (HHS) is a rare occupational disease. The risk group of HHS is patient whose dominate hand used as a hammer. Our study report unusually cases in Chiang Mai University Hospital. 19 year-old basketball player had right ulnar artery aneurysm for two months. After operation, his symptom was relieved and returned to play basketball again. 65 year-old housekeeper had non-dominated hand ulnar artery aneurysm for two years. After operation she still had hand claudication due to poor run-off vessel. HHS is previously state in risk group. But from our report there was a risk in different occupation.

  12. Analysis of water hammer events in nuclear power plants

    International Nuclear Information System (INIS)

    Sato, Masahiro; Yanagi, Chihiro

    1999-01-01

    A water hammer issue in nuclear power plants was one of unresolved safety issues listed by the United States Nuclear Regulatory Commission and was regarded as resolved. But later on, the water hammer events are still experienced intermittently, while the number of the events is decreasing. We collected water hammer events of PWRs in Japan and the United States and relevant documents, analyzed them, and studied corrective actions taken by Japanese plants. As a result, it is confirmed that preventive measured in design, operation etc. have been already taken and that mitigation mechanisms against water hammer have also been considered. However, it is clarified that attention should be continuously paid to operation of valves and/or pumps, as the prevention of water hammer still relies on operation. (author)

  13. Optimization analysis of swing check valve closing induced water hammer

    International Nuclear Information System (INIS)

    Han Wenwei; Han Weishi; Guo Qing; Wang Xin; Liu Chunyu

    2014-01-01

    A mathematical-physics model of double pump parallel feed system was constructed. The water hammer was precisely calculated, which was formed in the closing process of swing check valve. And a systematic analysis was carried out to determine the influence of the torques from both valve plate and damping torsion spring on the valve closing induced water hammer. The results show that the swing check valve would distinctly produce the water hammer during the closing procedure in the double pump parallel feed water system. The torques of the valve plate can partly reduce the water hammer effect, and implying appropriate materials of valve plate and appropriate spring can effectively relieve the harm of water hammer. (authors)

  14. Demonstration of a utility industry horizontal drilling system: Horizontal well AMH-5 installation report

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy's Office of Technology Development initiated an integrated demonstration of innovative technologies and systems for cleanup of VOCs in soils and groundwater at the Savannah River Site (SRS) in 1989. The overall goal of the program is demonstration of multiple technologies and systems in the fields of drilling, characterization, monitoring, and remediation at a single test bed. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program. Directional drilling has been shown to be a successful technique for enhancing access to the subsurface, thus improving remediation systems, especially remediation systems which perform in situ. Demonstration of an innovative directional drilling system at the Integrated Demonstration Site at the SRS, was initiated in June of 1992. The directional drilling system was designed to install an in situ remediation system. The drilling system is an experimental compaction/dry drilling technique developed by Charles Machine Works (Ditch Witch reg-sign) of Perry, Oklahoma. A horizontal well was installed in the M Area of the SRS below and parallel to an abandoned tile process sewer line. The installation of the horizontal well was a two-part process. Part one consisted of drilling the borehole, and part two was the horizontal well completion

  15. Multiple performance optimization of electrochemical drilling of Inconel 625 using Taguchi based Grey Relational Analysis

    Directory of Open Access Journals (Sweden)

    N. Manikandan

    2017-04-01

    Full Text Available In this present investigation, a multi performance characteristics optimization based on Taguchi approach with Grey Relational Analysis (GRA is proposed for Electrochemical Drilling process on Inconel 625 material which is used for marine, nuclear, aerospace applications, especially in corrosive environments. Experimental runs have been planned as per Taguchi’s principle with three input machining variables such as feed rate, flow rate of electrolyte and concentration of electrolyte. Besides the material removal rate and surface roughness, the geometric measures such as overcut, form and orientation tolerance are included as performance measures in this investigation. Outcomes of the analysis show that the feed rate is the predominant variable for the desired performance characteristics. On establishing the desired performance measures and multiple regression models are developed to be used as predictive tools. The confirmation test also conducted to validate the results attained by GRA approach and affirmed that there is considerable improvement with the help of proposed approach.

  16. Technical difficulties of logging while drilling in carbonate reservoirs and the countermeasures: A case study from the Sichuan Basin

    Directory of Open Access Journals (Sweden)

    Shudong Zhang

    2015-12-01

    Full Text Available In the Sichuan Basin, carbonate reservoirs are characterized by deep burial depth and strong heterogeneity, so it is difficult to conduct structure steering, pore space reservoir tracking and trajectory control in the process of geosteering logging while drilling. In this paper, a series of corresponding techniques for structure, reservoir and formation tracking were proposed after analysis was conducted on multiple series of carbonate strata in terms of their geologic and logging response characteristics. And investigation was performed on the adaptabilities of the following logging technologies to geosteering while drilling, including gamma ray imaging while drilling, resistivity imaging while drilling, density imaging while drilling, gamma ray logging while drilling, resistivity logging while drilling, neutron logging while drilling and density logging while drilling. After while drilling information was thoroughly analyzed, the logging suites for four common types of complicated reservoirs (thin layered reservoirs, thick massive reservoirs, denuded karst reservoirs and shale gas reservoirs were optimized, and five logging combinations suitable for different formations and reservoirs were proposed, including gamma ray logging + porosity + resistivity imaging, gamma ray logging + resistivity imaging, gamma ray logging + porosity + resistivity logging, gamma ray imaging + resistivity logging, and gamma ray logging. Field application indicates that it is of great reference and application value to use this method for the first time to summarize logging while drilling combinations for different types of carbonate reservoirs.

  17. Hypothenar hammer syndrome in an office worker.

    Science.gov (United States)

    Zhang, Fan; Weerakkody, Yuranga; Tosenovsky, Patrik

    2017-12-01

    Hypothenar hammer syndrome (HHS) is an uncommon cause of unilateral Raynaud's phenomenon, splinter haemorrhages and hypothenar weakness. The typical patient is a male blue-collar worker who uses their hypothenar eminence to hammer objects as part of their work. The distal ulnar artery beyond Guyon's canal is superficial and vulnerable to blunt trauma. CTA and MRA are common initial investigations and can suggest the diagnosis. DSA is the gold standard imaging modality and offers therapeutic opportunities. Management is controversial, but unless there is critical digital ischaemia, conservative treatment is first line. © 2017 The Royal Australian and New Zealand College of Radiologists.

  18. Drilling comparison in "warm ice" and drill design comparison

    DEFF Research Database (Denmark)

    Augustin, L.; Motoyama, H.; Wilhelms, F.

    2007-01-01

    For the deep ice-core drilling community, the 2005/06 Antarctic season was an exciting and fruitful one. In three different Antarctic locations, Dome Fuji, EPICA DML and Vostok, deep drillings approached bedrock (the ice-water interface in the case of Vostok), emulating what had previously been...... achieved at NorthGRIP, Greenland, (summer 2003 and 2004) and at EPICA Dome C2, Antarctica (season 2004/05). For the first time in ice-core drilling history, three different types of drill (KEMS, JARE and EPICA) simultaneously reached the depth of 'warm ice' under high pressure. After excellent progress...... at each site, the drilling rate dropped and the drilling teams had to deal with refrozen ice on cutters and drill heads. Drills have different limits and perform differently. In this comparative study, we examine depth, pressure, temperature, pump flow and cutting speed. Finally, we compare a few...

  19. Geothermal wells: a forecast of drilling activity

    Energy Technology Data Exchange (ETDEWEB)

    Brown, G.L.; Mansure, A.J.; Miewald, J.N.

    1981-07-01

    Numbers and problems for geothermal wells expected to be drilled in the United States between 1981 and 2000 AD are forecasted. The 3800 wells forecasted for major electric power projects (totaling 6 GWe of capacity) are categorized by type (production, etc.), and by location (The Geysers, etc.). 6000 wells are forecasted for direct heat projects (totaling 0.02 Quads per year). Equations are developed for forecasting the number of wells, and data is presented. Drilling and completion problems in The Geysers, The Imperial Valley, Roosevelt Hot Springs, the Valles Caldera, northern Nevada, Klamath Falls, Reno, Alaska, and Pagosa Springs are discussed. Likely areas for near term direct heat projects are identified.

  20. Head impact exposure measured in a single youth football team during practice drills.

    Science.gov (United States)

    Kelley, Mireille E; Kane, Joeline M; Espeland, Mark A; Miller, Logan E; Powers, Alexander K; Stitzel, Joel D; Urban, Jillian E

    2017-11-01

    OBJECTIVE This study evaluated the frequency, magnitude, and location of head impacts in practice drills within a youth football team to determine how head impact exposure varies among different types of drills. METHODS On-field head impact data were collected from athletes participating in a youth football team for a single season. Each athlete wore a helmet instrumented with a Head Impact Telemetry (HIT) System head acceleration measurement device during all preseason, regular season, and playoff practices. Video was recorded for all practices, and video analysis was performed to verify head impacts and assign each head impact to a specific drill. Eleven drills were identified: dummy/sled tackling, install, special teams, Oklahoma, one-on-one, open-field tackling, passing, position skill work, multiplayer tackle, scrimmage, and tackling drill stations. Generalized linear models were fitted to log-transformed data, and Wald tests were used to assess differences in head accelerations and impact rates. RESULTS A total of 2125 impacts were measured during 30 contact practices in 9 athletes (mean age 11.1 ± 0.6 years, mean mass 44.9 ± 4.1 kg). Open-field tackling had the highest median and 95th percentile linear accelerations (24.7 g and 97.8 g, respectively) and resulted in significantly higher mean head accelerations than several other drills. The multiplayer tackle drill resulted in the highest head impact frequency, with an average of 0.59 impacts per minute per athlete, but the lowest 95th percentile linear accelerations of all drills. The front of the head was the most common impact location for all drills except dummy/sled tackling. CONCLUSIONS Head impact exposure varies significantly in youth football practice drills, with several drills exposing athletes to high-magnitude and/or high-frequency head impacts. These data suggest that further study of practice drills is an important step in developing evidence-based recommendations for modifying or eliminating

  1. Evaluation of Reductive Option of Water Hammer Phenomenon for a Water Conveyance System, A Case Study of Shahid Shirdom Residential District-Tehran

    Directory of Open Access Journals (Sweden)

    Kiyomars roshangar

    2015-01-01

    Full Text Available Sudden changes in the boundary conditions of water transmission systems, such as sudden opening and closing of valves or abrupt on and off switching of pumps and turbines cause a transient flow called ‘water hammer’. In this study, comparisons were made between the effective parameters including pipeline material, on the one hand, and the equipment and tools available for reducing the effects of water hammer, on the other. For this purpose, a practical example of a water transmission line from a pumping station located near Shahid Shirdom Residential District to the upstream reservoir in Tehran was used for modeling by the Bentley Hammer XMV: 8 software. The results obtained for the different parameters and options were compared and it was revealed that, regarding the pipe material, GRP pipes reduced pressure by 49.1 Kpa compared to the Asbestos cement pipes and by 50.3 Kpa compared to the iron pipes. Comparison of the results for the protective systems indicated that the surge tank outperformed the other alternatives in controlling pressure such that maximum pressure was reduced by 3.9 bar when using surge tanks compared to the flywheel and by 5 bar compared to the check valve. Finally, it was found that the concurrent use of the surge tank and the flywheel would be the most ideal method for controlling the water hammer effects.

  2. Definitions of hammer toe and claw toe: an evaluation of the literature.

    Science.gov (United States)

    Schrier, Joost C M; Verheyen, Cees C P M; Louwerens, Jan Willem

    2009-01-01

    Lesser toe surgery is among the most conducted interventions in general orthopedic practice. However, the definitions of hammer toe and claw toe are not uniform. The objective of this literature study is to propose clear definitions for these deformities to establish unambiguous communication. A literature search was performed in the PubMed database (May 2006). Of 81 eligible articles, 42 that stated a clear definition of hammer toe or claw toe were selected. In all 35 articles in which hammer toe was clearly defined, flexion in the proximal interphalangeal joint was part of the definition. Seventeen articles (49%) defined hammer toe as a combination of metatarsophalangeal extension and proximal interphalangeal flexion. Thirteen articles showed flexion of the proximal interphalangeal joint as the single criterion. Twenty-three articles with a clear definition of claw toe were selected. Twenty-one articles (91%) showed metatarsophalangeal extension as part of the claw toe deformity. Twelve articles (52%) regarded metatarsophalangeal extension and flexion of the proximal interphalangeal and distal interphalangeal joints as the essential characteristics. Seven articles described a claw toe as metatarsophalangeal extension with flexion in the proximal interphalangeal joint. There are variations in the definitions of lesser toe deformities in the literature. We propose that extension of the metatarsophalangeal joint is the discriminating factor and essential characteristic for claw toe. Claw toe and hammer toe should be characterized by flexion in the proximal interphalangeal joint, which is the single criterion for a hammer toe. The flexibility of these joints could be a basic factor in discriminating between these deformities. The development of these deformities should be regarded as a continuum in the same pathophysiologic process.

  3. Putting a damper on drilling's bad vibrations

    Energy Technology Data Exchange (ETDEWEB)

    Jardine, S [Sedco forex, Montrouge (France); Malone, D [Anadrill, Sugar Land, TX (United States); Sheppard, M [Schlumberger Cambridge Research, Cambridge (United Kingdom)

    1994-01-01

    Harmful drilling vibrations are costing the industry dearly. Three main vibration types (axial, torsional and transverse) are explained and its causes discussed. Technology exists to eliminate most vibrations, but requires more systematic deployment than is usual. Hardware that eliminates vibrations is reviewed, including downhole shock measurement, torque feedback shock guards and antiwhirl bits. 9 figs., 11 refs.

  4. A New Triangular Flat Shell Element With Drilling Rotations

    DEFF Research Database (Denmark)

    Damkilde, Lars

    2008-01-01

    A new flat triangular shell element has been developed based on a newly developed triangular plate bending element by the author and a new triangular membrane element with drilling degrees of freedom. The advantage of the drilling degree of freedom is that no special precautions have to be made...... in connecting with assembly of elements. Due to the drilling rotations all nodal degrees of freedom have stiffness, and therefore no artificial suppression of degrees of freedom are needed for flat or almost flat parts of the shell structure....

  5. Characterization of rotary-percussion drilling as a seismic-while-drilling source

    Science.gov (United States)

    Xiao, Yingjian; Hurich, Charles; Butt, Stephen D.

    2018-04-01

    This paper focuses on an evaluation of rotary-percussion drilling (RPD) as a seismic source. Two field experiments were conducted to characterize seismic sources from different rocks with different strengths, i.e. weak shale and hard arkose. Characterization of RPD sources consist of spectral analysis and mean power measurements, along with field measurements of the source radiation patterns. Spectral analysis shows that increase of rock strength increases peak frequency and widens bandwidth, which makes harder rock more viable for seismic-while-drilling purposes. Mean power analysis infers higher magnitude of body waves in RPD than in conventional drillings. Within the horizontal plane, the observed P-wave energy radiation pattern partially confirms the theoretical radiation pattern under a single vertical bit vibration. However a horizontal lobe of energy is observed close to orthogonal to the axial bit vibration. From analysis, this lobe is attributed to lateral bit vibration, which is not documented elsewhere during RPD. Within the horizontal plane, the observed radiation pattern of P-waves is generally consistent with a spherically-symmetric distribution of energy. In addition, polarization analysis is conducted on P-waves recorded at surface geophones for understanding the particle motions. P-wave particle motions are predominantly in the vertical direction showing the interference of the free-surface.

  6. Rotary Percussive Auto-Gopher for Deep Drilling and Sampling

    Science.gov (United States)

    Bar-Cohen, Yoseph; Badescu, Mircea; Sherrit, Stewart

    2009-01-01

    The term "rotary percussive auto-gopher" denotes a proposed addition to a family of apparatuses, based on ultrasonic/ sonic drill corers (USDCs), that have been described in numerous previous NASA Tech Briefs articles. These apparatuses have been designed, variously, for boring into, and/or acquiring samples of, rock or other hard, brittle materials of geological interest. In the case of the rotary percussive autogopher, the emphasis would be on developing an apparatus capable of penetrating to, and acquiring samples at, depths that could otherwise be reached only by use of much longer, heavier, conventional drilling-and-sampling apparatuses. To recapitulate from the prior articles about USDCs: A USDC can be characterized as a lightweight, low-power jackhammer in which a piezoelectrically driven actuator generates ultrasonic vibrations and is coupled to a tool bit through a free mass. The bouncing of the free mass between the actuator horn and the drill bit converts the actuator ultrasonic vibrations into sonic hammering of the drill bit. The combination of ultrasonic and sonic vibrations gives rise to a hammering action (and a resulting chiseling action at the tip of the tool bit) that is more effective for drilling than is the microhammering action of ultrasonic vibrations alone. The hammering and chiseling actions are so effective that the size of the axial force needed to make the tool bit advance into soil, rock, or another material of interest is much smaller than in ordinary rotary drilling, ordinary hammering, or ordinary steady pushing. The predecessor of the rotary percussive auto-gopher is an apparatus, now denoted an ultrasonic/sonic gopher and previously denoted an ultrasonic gopher, described in "Ultrasonic/ Sonic Mechanism for Drilling and Coring" (NPO-30291), NASA Tech Briefs Vol. 27, No. 9 (September 2003), page 65. The ultrasonic/sonic gopher is intended for use mainly in acquiring cores. The name of the apparatus reflects the fact that, like a

  7. Experimental Investigation on the Performance of Grinding Assisted Electrochemical Discharge Drilling of Glass

    Directory of Open Access Journals (Sweden)

    Ladeesh V G

    2016-01-01

    Full Text Available Grinding assisted electrochemical discharge drilling (G-ECDD is a novel technique for producing micro and macro holes in brittle materials including advanced ceramics and glass, both efficiently and economically. G-ECDD involves the use of a rotating diamond core drill as the tool in a normal electrochemical discharge machine setup. The material removal happens by a combination of thermal melting due to electric discharges, followed by grinding action of diamond grits and chemical etching action. In this study, the effect of process parameters like voltage, duty cycle, cycle time and electrolyte concentration on material removed (MR was investigated systematically using response surface methodology. Analysis of variance was performed to identify the significant factors and their percentage contribution. The most significant factor was found to be duty cycle followed by voltage, cycle time and concentration. A quadratic mathematical model was developed to predict MR. Tool wear was found for different frequencies and voltages. Higher tool wear was observed for high frequency above 5kHz pulsed DC supply at high voltage of 110V. Tool wear at the end face of the tool was found to be a significant problem affecting the tool life.

  8. Meshless computation of water hammer

    NARCIS (Netherlands)

    Tijsseling, A.S.; Bergant, A.

    2007-01-01

    Water hammer concerns the generation, propagation, reflection and damping of pressure waves in liquidfilled pipe systems. The numerical simulation of water-hammer events is usually based on one-dimensional mathematical models. Two equations representing the conservation of mass and momentum govern

  9. Burn-up physics in a coupled Hammer-Technion/Cinder-2 system and ENDF/B-V aggregate fission product thermal cross section validation

    International Nuclear Information System (INIS)

    Santos, A. dos.

    1990-01-01

    The new methodology developed in this work has the following purposes: a) to implement a burnup capability into the HAMMER-TECHNION/9/computer code by using the CINDER-2/10/computer code to perform the transmutation analysis for the actinides and fission products; b) to implement a reduced version of the CINDER-2 fission product chain structure to treat explicity nearly 99% of all original CINDER-2 fission product absorption in a typical PWR unit cell; c) to treat the effect of the fission product neutron absorption in an unit cell in a multigroup basis; d) to develop a tentative validation procedure for the ENOF/C-V stable and long-lived fission product nuclear data based on the available experimental data/11-14/. The analysis will be performed by using the reduce chain in the coupled system CINDER-2 to generate the time dependent effective four group cross sections for actinides and fission products and CINDER-2 to perform the complete transmutation analysis with its built-in chain structure. (author)

  10. Investigation on Releasing of a Stuck Drill String by Means of a Mechanical Jar

    Directory of Open Access Journals (Sweden)

    Moisyshyn V.

    2017-09-01

    Full Text Available Purpose. In this article the most important part is dedicated to the research of elimination of accident that is caused by drill string sticking during the process. That is why it is necessary to develop a mathematical model of the mechanic system: travelling system + drill string + mechanical jar + rock, to develop a computer model for numerical calculation of dynamic characteristics of firing gear. The aim is to use the results of the research and to work out recommendations for expediency of jar application. Methods. For description of the drill string we are using synthesis of the wave theory and theory of the local distortions. For mathematical modeling of firing device we are offering the use of the combined method that combines static solutions of the theory of elasticity for contact zone of drill string and method of a plain wave of Saint-Venant. We solved systems of differential equations using the methods of mathematical physics. An algorithm of the numerical decision which mounted in the computing environment were used at simulation of the longitudinal impact to the stuck drill pipe. In this article we designed a wave chart of the equation system of the drill pipe and conducted step-by-step calculation of a collision momentum. We also designed a computer program for numerical modeling of the drill pipe mechanism with firing gear. We also designed a method of calculation of main dynamic characteristics of firing device that will help analyze and prove the performance of the mechanical jar. A wave diagram was built that shows the impact forces and speeds on the boundary surfaces of the sections of the drill string. There were calculated main dynamic characteristic of mechanical the jar. Originality. Authors also developed a dynamic mathematical model that combined elastic vibrations of continual system of loose part drill pipe, impact mechanisms and discrete movements of a given drill pipe. The process of a mechanical jar

  11. Performance evaluation of vegetable-based oils in drilling austenitic stainless steel

    DEFF Research Database (Denmark)

    Belluco, Walter; De Chiffre, Leonardo

    2004-01-01

    breaking were recorded for each bore, and tool wear was measured at constant intervals. A commercial mineral-based oil was taken as reference product, and five vegetable-based cutting fluids at different levels of additivation were tested. All measured parameters were in agreement, confirming......The efficiency of six cutting oils was evaluated in drilling AISI 316L austenitic stainless steel using conventional HSS-Co tools by measurements of tool life, tool wear, cutting forces and chip formation. Seven tools were tested with each fluid to catastrophic failure. Cutting forces and chip...... to tool life testing. All vegetable-based fluids performed better than the reference product. The best performance was obtained with a cutting fluid yielding 177% increases in tool life and 7% reduction in thrust force. (C) 2003 Elsevier B.V. All rights reserved....

  12. Evaluation on the Presence of Nano Silver Particle in Improving a Conventional Water-based Drilling Fluid

    Science.gov (United States)

    Husin, H.; Ahmad, N.; Jamil, N.; Chyuan, O. H.; Roslan, A.

    2018-05-01

    Worldwide demand in oil and gas energy consumption has been driving many of oil and gas companies to explore new oil and gas resource field in an ultra-deep water environment. As deeper well is drilled, more problems and challenges are expected. The successful of drilling operation is highly dependent on properties of drilling fluids. As a way to operate drilling in challenging and extreme surroundings, nanotechnology with their unique properties is employed. Due to unique physicochemical, electrical, thermal, hydrodynamic properties and exceptional interaction potential of nanomaterials, nanoparticles are considered to be the most promising material of choice for smart fluid design for oil and gas field application. Throughout this paper, the effect of nano silver particle in improving a conventional water based drilling fluid was evaluated. Results showed that nano silver gave a significant improvement to the conventional water based drilling fluid in terms of its rheological properties and filtration test performance.

  13. Effect of hammer mass on upper extremity joint moments.

    Science.gov (United States)

    Balendra, Nilanthy; Langenderfer, Joseph E

    2017-04-01

    This study used an OpenSim inverse-dynamics musculoskeletal model scaled to subject-specific anthropometrics to calculate three-dimensional intersegmental moments at the shoulder, elbow and wrist while 10 subjects used 1 and 2 lb hammers to drive nails. Motion data were collected via an optoelectronic system and the interaction of the hammer with nails was recorded with a force plate. The larger hammer caused substantial increases (50-150%) in moments, although increases differed by joint, anatomical component, and significance of the effect. Moment increases were greater in cocking and strike/follow-through phases as opposed to swinging and may indicate greater potential for injury. Compared to shoulder, absolute increases in peak moments were smaller for elbow and wrist, but there was a trend toward larger relative increases for distal joints. Shoulder rotation, elbow varus-valgus and pronation-supination, and wrist radial-ulnar deviation and rotation demonstrated large relative moment increases. Trial and phase durations were greater for the larger hammer. Changes in moments and timing indicate greater loads on musculoskeletal tissues for an extended period with the larger hammer. Additionally, greater variability in timing with the larger hammer, particularly for cocking phase, suggests differences in control of the motion. Increased relative moments for distal joints may be particularly important for understanding disorders of the elbow and wrist associated with hammer use. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. Minimising the risk of water hammer and other problems at the beginning of stagnation of solar thermal plants - A theoretical approach

    International Nuclear Information System (INIS)

    Streicher, W.

    2000-01-01

    Solar plants are increasingly used not only for hot tap water heating but also for the assistance of space heating. These plants produce much more energy in summer than needed, which often results in stagnation. Because of stagnation-temperatures of todays selective collectors up to 200 deg. C, the collector fluid evaporates. In several plants a high noise level and a vibration of the plant during this evaporation phase is reported. This is due to the occurrence of water hammers in the system, when liquid collector fluid passes areas where the fluid was already evaporated and superheated. The remaining vapor bubbles deflate rapidly and the liquid phases collide with high velocity, which results in a rapid pressure increase. This paper describes the theory of condensate-induced water hammers and conditions of solar plants, under which this can happen. A simulation model for the evaporation phase of the collector is presented to give a deeper understanding about the influences of solar radiation, the size of the tubing, and the size of the expansion device on the process of the evaporation. Three hydraulic layouts of the collector area are discussed for there possibilities producing water hammers. (au)

  15. Feasibility study of a hand guided robotic drill for cochleostomy.

    Science.gov (United States)

    Brett, Peter; Du, Xinli; Zoka-Assadi, Masoud; Coulson, Chris; Reid, Andrew; Proops, David

    2014-01-01

    The concept of a hand guided robotic drill has been inspired by an automated, arm supported robotic drill recently applied in clinical practice to produce cochleostomies without penetrating the endosteum ready for inserting cochlear electrodes. The smart tactile sensing scheme within the drill enables precise control of the state of interaction between tissues and tools in real-time. This paper reports development studies of the hand guided robotic drill where the same consistent outcomes, augmentation of surgeon control and skill, and similar reduction of induced disturbances on the hearing organ are achieved. The device operates with differing presentation of tissues resulting from variation in anatomy and demonstrates the ability to control or avoid penetration of tissue layers as required and to respond to intended rather than involuntary motion of the surgeon operator. The advantage of hand guided over an arm supported system is that it offers flexibility in adjusting the drilling trajectory. This can be important to initiate cutting on a hard convex tissue surface without slipping and then to proceed on the desired trajectory after cutting has commenced. The results for trials on phantoms show that drill unit compliance is an important factor in the design.

  16. Feasibility Study of a Hand Guided Robotic Drill for Cochleostomy

    Directory of Open Access Journals (Sweden)

    Peter Brett

    2014-01-01

    Full Text Available The concept of a hand guided robotic drill has been inspired by an automated, arm supported robotic drill recently applied in clinical practice to produce cochleostomies without penetrating the endosteum ready for inserting cochlear electrodes. The smart tactile sensing scheme within the drill enables precise control of the state of interaction between tissues and tools in real-time. This paper reports development studies of the hand guided robotic drill where the same consistent outcomes, augmentation of surgeon control and skill, and similar reduction of induced disturbances on the hearing organ are achieved. The device operates with differing presentation of tissues resulting from variation in anatomy and demonstrates the ability to control or avoid penetration of tissue layers as required and to respond to intended rather than involuntary motion of the surgeon operator. The advantage of hand guided over an arm supported system is that it offers flexibility in adjusting the drilling trajectory. This can be important to initiate cutting on a hard convex tissue surface without slipping and then to proceed on the desired trajectory after cutting has commenced. The results for trials on phantoms show that drill unit compliance is an important factor in the design.

  17. Condensation induced water hammer in steam supply system

    International Nuclear Information System (INIS)

    Andrews, P.B.; Antaki, G.A.; Rawls, G.B.; Gutierrez, B.J.

    1995-01-01

    The accidental mixing of steam and water usually leads to condensation induced water hammer. This phenomenon is not uncommon in the power and process industries, and is of particular concern due to the high energies which accompany steam transients. The paper discusses the conditions which lead to a recent condensation induced water hammer in a 150 psig steam supply header. The ensuing structural damage, inspection and repairs are described. Finally, a list of design, maintenance and operational cautions are presented to help minimize the potential for condensation induced water hammer in steam lines

  18. Condensation induced water hammer in steam supply system

    International Nuclear Information System (INIS)

    Andrews, P.B.; Antaki, G.A.; Rawls, G.B.; Gutierrez, B.J.

    1995-01-01

    The accidental mixing of steam and water usually leads to condensation induced water hammer. THis phenomenon is not uncommon in the power and process industries, and is of particular concern due to the high energies which accompany steam transients. The paper discusses the conditions which lead to a recent condensation induced water hammer in a 150 psig steam supply header. The insuing structural damage, inspection and repairs are described. Finally, a list of design cautions are presented to help minimize the potential for condensation induced water hammer in steam lines

  19. Helium hammer in superfluid transfer

    Science.gov (United States)

    Tward, E.; Mason, P. V.

    1984-01-01

    Large transient pressure pulses, referred to as a helium hammer, which occurred in the transfer line of the main cryogenic tank during the development tests of the Infrared Astronomical Satellite, launched on January 25, 1983, are analyzed, and the measures taken to prevent a failure described. The modifications include an installation of a 2.3-liter surge tank upstream, and a back-up relief valve downstream, of a burst disk. The surge tank is designed to attenuate a 0.33-MPa pressure pulse at the inlet down to 0.092 MPa at the outlet. A mechanism of the pulse generation is suggested, which involves flashing and rapid recondensation of the small amount of liquid entering the warm section of a transition to room temperature.

  20. Chebyshev super spectral viscosity method for water hammer analysis

    Directory of Open Access Journals (Sweden)

    Hongyu Chen

    2013-09-01

    Full Text Available In this paper, a new fast and efficient algorithm, Chebyshev super spectral viscosity (SSV method, is introduced to solve the water hammer equations. Compared with standard spectral method, the method's advantage essentially consists in adding a super spectral viscosity to the equations for the high wave numbers of the numerical solution. It can stabilize the numerical oscillation (Gibbs phenomenon and improve the computational efficiency while discontinuities appear in the solution. Results obtained from the Chebyshev super spectral viscosity method exhibit greater consistency with conventional water hammer calculations. It shows that this new numerical method offers an alternative way to investigate the behavior of the water hammer in propellant pipelines.

  1. Quality assurance for hammer forgings

    International Nuclear Information System (INIS)

    Potthast, E.

    1984-01-01

    The quality assurance program introduced by Arbed Saarstahl and laid down in a quality assurance manual is described. A particular attention is attached thereby both to quality practice proper and to a reliable flow of information amongst all the persons involved. The production and test sequence schedules of the hammer forging plant are illustrated by the example of a forged valve housing for nuclear power plants. These schedules specify not only the forging process in the individual production stages but also the workpiece contour after each working operation, the heat treatment, the furnace charging, and the inspection of finished parts. The formalization of the tests is designed both to promote the customer's trust towards the supplier and to prevent the formal operations involved from hindering further technical development. (orig.) [de

  2. New high-performance, water-based fluid benefits Santos basin operations with excellent inhibition and drilling efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Tom; West, Gary [Halliburton Baroid, Santos, SP (Brazil)

    2004-07-01

    For decades drilling fluids companies have been striving to create a water-based fluid (WBF) that yields performance similar to that of an invert emulsion in the areas of hole stability, rate of penetration (ROP) and lubricity. The HYDRO-GUARD system is a new highly inhibitive WBF that can yield drilling performance approaching that of an invert emulsion system. The new system uses a new combination of polymeric additives designed to inhibit reactive clays, minimize colloidal solids buildup, and produce a lubricious, gauge wellbore. This paper compares the field performance of the HYDRO-GUARD system on two recent Santos Basin wells drilled to over 5,000 m with the performance of synthetic-based fluids (SBF) used historically in the same area. Bottom hole temperatures (BHT) on these wells exceeded 315 deg F (157 deg C). Performance measures such as hole cleaning, penetration rates, hole stability, and torque and drag will be reviewed as well as general system benefits. (author)

  3. Hard rock star : Weatherford's multiphase performance drilling system increases penetration rates in hard, abrasive formations

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M.

    2010-12-15

    This article described Weatherford's Multiphase Performance Drilling (MPPD) system that enhances drilling rate penetration. The technology was awarded the 2010 winner for best drilling technology for a company with 100 employees or more. Weatherford Canada and Suncor Energy developed the patent-pending MPPD system in the Panther field, and have expanded its use to Suncor's Kelly Lake and Gwillim plays in British Columbia. The new technology is ready to be launched worldwide. This article discussed the MPPD system, with particular reference to its benefits; process; cost savings; and technology utilization. The technique is ideal for drilling in harsh, abrasive formations such as the Nikanassin or Cadomin. It has allowed Suncor to save as much as $1.5 million per well. The article also noted that the key to the process is the controlled use of nitrogen to lighten mud weight. Weatherford used its model 7000 rotating control device to provide precise control of the wellbore pressure profile. It was concluded that Weatherford had significant praise for its partner in developing the MPPD system since its inception with Suncor in 2004, particularly since few client companies have the patience and the willingness to make expensive long-term investment necessary to perfect such systems. 2 figs.

  4. Modern Modeling of Water Hammer

    Directory of Open Access Journals (Sweden)

    Urbanowicz Kamil

    2017-09-01

    Full Text Available Hydraulic equipment on board ships is common. It assists in the work of: steering gear, pitch propellers, watertight doors, cargo hatch covers, cargo and mooring winches, deck cranes, stern ramps etc. The damage caused by transient flows (which include among others water hammer are often impossible to repair at sea. Hence, it is very important to estimate the correct pressure runs and associated side effects during their design. The presented study compares the results of research on the impact of a simplified way of modeling the hydraulic resistance and simplified effective weighting functions build of two and three-terms on the estimated results of the pressure changes. As it turns out, simple effective two-terms weighting functions are able to accurately model the analyzed transients. The implementation of the presented method will soon allow current automatic protection of hydraulic systems of the adverse effects associated with frequent elevated and reduced pressures.

  5. Monte Carlo simulation of the Tomotherapy treatment unit in the static mode using MC HAMMER, a Monte Carlo tool dedicated to Tomotherapy

    International Nuclear Information System (INIS)

    Sterpin, E; Tomsej, M; Cravens, B; Salvat, F; Ruchala, K; Olivera, G H; Vynckier, S

    2007-01-01

    Helical tomotherapy (HT) is designed to deliver highly modulated IMRT treatments. The concept of HT provides new challenges in MC simulation, because simultaneous movement of the gantry, the couch and the multi-leaf collimator (MLC) must be simulated accurately. However, before accounting for gantry, couch movement and multileaf collimator configurations, high accuracy must be achieved while simulating open static fields (1 x 40, 2.5 x 40 and 5 x 40 cm 2 ). This is performed using MC HAMMER, which is a graphical user interface allowing MC simulation using PENELOPE for various configurations of HT. Since the geometry of the different elements and materials involved in the beam generation are precisely known and defined, the only parameters that need to be tuned on are therefore electron source spot size and electron energy. Beyond the build up region, good agreement (2%/1mm) is achieved for all the field sizes between measurements (ion chamber) and simulations with an electron source energy set to 5.5 MeV. The electron source spot size is modelled as a gaussian distribution with full width half maximum equal to 1.4 mm. This value was chosen to match measured and calculated penumbras in the longitudinal direction

  6. Framework for a comparative environmental assessment of drilling fluids

    Energy Technology Data Exchange (ETDEWEB)

    Meinhold, A.F.

    1998-11-01

    During the drilling of an oil or gas well, drilling fluid (or mud) is used to maintain well control and to remove drill cuttings from the hole. In response to effluent limitation guidelines promulgated by the US Environmental Protection Agency (EPA) for discharge of drilling wastes offshore, alternatives to water and oil-based muds have been developed. These synthetic-based muds (SBMs) are more efficient than water-based muds (WBMs) for drilling difficult and complex formation intervals and have lower toxicity and smaller environmental impacts than diesel or conventional mineral oil-based muds (OBMs). A third category of drilling fluids, derived from petroleum and called enhanced mineral oils (EMOs), also have these advantages over the traditionally used OBMs and WBMs. EPA recognizes that SBMs and EMOs are new classes of drilling fluids, but their regulatory status is unclear. To address this uncertainty, EPA is following an innovative presumptive rulemaking process that will develop final regulations for SBM discharges offshore in less than three years. This report develops a framework for a comparative risk assessment for the discharge of SBMs and EMOs, to help support a risk-based, integrated approach to regulatory decision making. The framework will help identify potential impacts and benefits associated with the use of SBMs, EMOs, WBMs, and OBMs; identify areas where additional data are needed; and support early decision-making in the absence of complete data. As additional data becomes available, the framework can support a full quantitative comparative assessment. Detailed data are provided to support a comparative assessment in the areas of occupational and public health impacts.

  7. Reduced abrasion drilling fluid

    NARCIS (Netherlands)

    2010-01-01

    A reduced abrasion drilling fluid system and method of drilling a borehole by circulating the reduced abrasion drilling fluid through the borehole is disclosed. The reduced abrasion drilling fluid comprises a drilling fluid, a first additive and a weighting agent, wherein the weighting agent has a

  8. Reduced abrasion drilling fluid

    NARCIS (Netherlands)

    2012-01-01

    A reduced abrasion drilling fluid system and method of drilling a borehole by circulating the reduced abrasion drilling fluid through the borehole is disclosed. The reduced abrasion drilling fluid comprises a drilling fluid, a first additive and a weighting agent, wherein the weighting agent has a

  9. Development and application of a packer-type drilling-free liner hanger

    Directory of Open Access Journals (Sweden)

    Xin Tang

    2014-12-01

    Full Text Available In liner cementing, the upper cement plug and inner components of a common hanger needs to be drilled out after cementing, which will result in a poor cementing quality or even gas leakage at the flare opening. Therefore, a new packer-type drilling-free liner hanger has been developed, and a hydraulic setting-control packer, a flexible drilling-free seal box, and an auxiliary bearing back-off mechanism that go with the line hanger have been designed at the same time. Specific operation procedures include: (1 run in the liner string to the designed depth, then fully circulate the drilling fluid, finally drop the ball. When the tripping ball gets into the seat, the pressure will go up to cut off the hanging control pin and set the hanger; (2 continue to hold the pressure and cut off the ball seat pin to form circulation; (3 trip in the drill pipe to exert pressure on the hanger, back off to release the hanger from the running tool; (4 lower the drill pipe plug upon the completion of cement injection, cut off the releasing control pin of hollow casing plug, and run down further to bump with the bumping assembly; (5 remove the cementing head and connect the kelly driver, hold pressure again, then slowly pull up the drill tools, exert hydraulic pressure on the setting hydraulic cylinder of the packer assembly to cut off the setting control pin and set the packer; and (6 pull up the tools to the flare opening and wash out excessive cement slurry by circulating to realize free drilling of the whole hole. The successful application of the liner hanger in 127 mm diameter liner in Well BQ203-H1 indicates that the packer-type liner hanger has such advantages as easy hanging and back-off, accurate bumping, simple setting, and sound sealing performance.

  10. S-HAMMER: hierarchical attribute-guided, symmetric diffeomorphic registration for MR brain images.

    Science.gov (United States)

    Wu, Guorong; Kim, Minjeong; Wang, Qian; Shen, Dinggang

    2014-03-01

    Deformable registration has been widely used in neuroscience studies for spatial normalization of brain images onto the standard space. Because of possible large anatomical differences across different individual brains, registration performance could be limited when trying to estimate a single directed deformation pathway, i.e., either from template to subject or from subject to template. Symmetric image registration, however, offers an effective way to simultaneously deform template and subject images toward each other until they meet at the middle point. Although some intensity-based registration algorithms have nicely incorporated this concept of symmetric deformation, the pointwise intensity matching between two images may not necessarily imply the matching of correct anatomical correspondences. Based on HAMMER registration algorithm (Shen and Davatzikos, [2002]: IEEE Trans Med Imaging 21:1421-1439), we integrate the strategies of hierarchical attribute matching and symmetric diffeomorphic deformation to build a new symmetric-diffeomorphic HAMMER registration algorithm, called as S-HAMMER. The performance of S-HAMMER has been extensively compared with 14 state-of-the-art nonrigid registration algorithms evaluated in (Klein et al., [2009]: NeuroImage 46:786-802) by using real brain images in LPBA40, IBSR18, CUMC12, and MGH10 datasets. In addition, the registration performance of S-HAMMER, by comparison with other methods, is also demonstrated on both elderly MR brain images (>70 years old) and the simulated brain images with ground-truth deformation fields. In all experiments, our proposed method achieves the best registration performance over all other registration methods, indicating the high applicability of our method in future neuroscience and clinical applications. Copyright © 2013 Wiley Periodicals, Inc.

  11. A review on the effect of mechanical drilling on polymer nanocomposites

    International Nuclear Information System (INIS)

    Starost, Kristof; Njuguna, James

    2014-01-01

    Over the past decade, polymer nanocomposites have undergone intensive research and development ensued by its increasing implementation within commercial applications. Consequently, the full life-cycle performance and any health risks associated with these materials have become of major interest. Throughout its use, a nanocomposite will undergo industrial machining where drilling can lead to material damage and/or exposure to the potentially toxic nanoparticles. This study assesses the existing and perspective research on nanocomposite drilling. Currently, although considerable amount of studies have investigated machining on conventional composite materials, there is a lack in knowledge on the effect of drilling on nanocomposites. The data underlines the various drilling parameters that will affect and influence the damage to the material and nano-sized particles released. Importantly, previous studies have identified potential mechanical damage caused by drilling and the release-ability of toxic nanoparticles from nanocomposites. It is therefore crucial to develop a full understanding and characterization on the effect of drilling on polymer nanocomposites

  12. Drilling trends in the nineties

    International Nuclear Information System (INIS)

    1993-01-01

    At a conference on various aspects of well drilling in the 1990s, papers were presented on drilling waste management, well completion and workovers, drilling fluids, drilling rig equipment and design, drilling mechanics, drill stem testing and materials, cementing, business management, health and safety, environmental issues, and directional drilling technology. Separate abstracts have been prepared for 46 papers from this conference

  13. Saturation of plastic deformation by swift heavy ion irradiation: Ion hammering vs. surface effects

    Energy Technology Data Exchange (ETDEWEB)

    Ferhati, Redi; Dautel, Knut; Bolse, Wolfgang [Institut fuer Halbleiteroptik und Funktionelle Grenzflaechen, Universitaet Stuttgart (Germany); Fritzsche, Monika [Helmholtz-Zentrum Dresden-Rossendorf (Germany)

    2012-07-01

    Swift heavy ion (SHI) induced plastic deformation is a subject of current research and scientific discussion. This *Ion Hammering* phenomenon was first observed 30 years ago in amorphous materials like metallic glasses. About 10 years ago, Feyh et al. have shown that stress generation and *Ion Hammering* result in self-organization of thin NiO-films on Si-wafers into a sub-micron lamellae-like structure under grazing angle irradiation. The growth of the lamellae was found to saturate as soon as they have reached a thickness of a few hundreds of nm. Here we show our latest results on the restructuring of pre-patterned thin oxide films by SHI under various irradiation conditions. The experiments were performed by employing (in-situ) scanning electron microscopy, and were complemented by (in-situ) energy dispersive x-ray analysis and atomic force microscopy. As we will show, the saturation behavior can be understood as a competition of *Ion Hammering* and surface energy effects, while the unexpected fact, that the initially crystalline films undergo *Ion Hammering* can possibly be attributed to oxygen loss and thus amorphization during irradiation.

  14. A method for automated processing of measurement information during mechanical drilling

    Energy Technology Data Exchange (ETDEWEB)

    Samonenko, V.I.; Belinkov, V.G.; Romanova, L.A.

    1984-01-01

    An algorithm is cited for a developed method for automated processing of measurement information during mechanical drilling. Its use in conditions of operation of an automated control system (ASU) from drilling will make it possible to precisely identify a change in the lithology, the physical and mechanical and the abrasive properties, in the stratum (pore) pressure in the rock being drilled out during mechanical drilling, which along with other methods for testing the drilling process will increase the reliability of the decisions made.

  15. Simulation of water hammer phenomena using the system code ATHLET

    Energy Technology Data Exchange (ETDEWEB)

    Bratfisch, Christoph; Koch, Marco K. [Bochum Univ. (Germany). Reactor Simulation and Safety Group

    2017-07-15

    Water Hammer Phenomena can endanger the integrity of structures leading to a possible failure of pipes in nuclear power plants as well as in many industrial applications. These phenomena can arise in nuclear power plants in the course of transients and accidents induced by the start-up of auxiliary feed water systems or emergency core cooling systems in combination with rapid acting valves and pumps. To contribute to further development and validation of the code ATHLET (Analysis of Thermalhydraulics of Leaks and Transients), an experiment performed in the test facility Pilot Plant Pipework (PPP) at Fraunhofer UMSICHT is simulated using the code version ATHLET 3.0A.

  16. Simulation of water hammer phenomena using the system code ATHLET

    International Nuclear Information System (INIS)

    Bratfisch, Christoph; Koch, Marco K.

    2017-01-01

    Water Hammer Phenomena can endanger the integrity of structures leading to a possible failure of pipes in nuclear power plants as well as in many industrial applications. These phenomena can arise in nuclear power plants in the course of transients and accidents induced by the start-up of auxiliary feed water systems or emergency core cooling systems in combination with rapid acting valves and pumps. To contribute to further development and validation of the code ATHLET (Analysis of Thermalhydraulics of Leaks and Transients), an experiment performed in the test facility Pilot Plant Pipework (PPP) at Fraunhofer UMSICHT is simulated using the code version ATHLET 3.0A.

  17. Numerical and in-situ investigations of water hammer effects in Drava river Kaplan turbine hydropower plants

    Science.gov (United States)

    Bergant, A.; Gregorc, B.; Gale, J.

    2012-11-01

    This paper deals with critical flow regimes that may induce unacceptable water hammer in Kaplan turbine hydropower plants. Water hammer analysis should be performed for normal, emergency and catastrophic operating conditions. Hydropower plants with Kaplan turbines are usually comprised of relatively short inlet and outlet conduits. The rigid water hammer theory can be used for this case. For hydropower plants with long penstocks the elastic water hammer should be used. Some Kaplan turbine units are installed in systems with long open channels. In this case, water level oscillations in the channels should be carefully investigated. Computational results are compared with results of measurements in recently rehabilitated seven Drava river hydroelectric power plants in Slovenia. Water hammer in the six power plants is controlled by appropriate adjustment of the wicket gates and runner blades closing/opening manoeuvres. Due to very long inflow and outflow open channels in Zlatoličje HPP a special vaned pressure regulating device attenuates extreme pressures in Kaplan turbine flow-passage system and controls unsteady flow in both open channels. Comparisons of results include normal operating regimes. The agreement between computed and measured results is reasonable.

  18. Numerical and in-situ investigations of water hammer effects in Drava river Kaplan turbine hydropower plants

    International Nuclear Information System (INIS)

    Bergant, A; Gregorc, B; Gale, J

    2012-01-01

    This paper deals with critical flow regimes that may induce unacceptable water hammer in Kaplan turbine hydropower plants. Water hammer analysis should be performed for normal, emergency and catastrophic operating conditions. Hydropower plants with Kaplan turbines are usually comprised of relatively short inlet and outlet conduits. The rigid water hammer theory can be used for this case. For hydropower plants with long penstocks the elastic water hammer should be used. Some Kaplan turbine units are installed in systems with long open channels. In this case, water level oscillations in the channels should be carefully investigated. Computational results are compared with results of measurements in recently rehabilitated seven Drava river hydroelectric power plants in Slovenia. Water hammer in the six power plants is controlled by appropriate adjustment of the wicket gates and runner blades closing/opening manoeuvres. Due to very long inflow and outflow open channels in Zlatolicje HPP a special vaned pressure regulating device attenuates extreme pressures in Kaplan turbine flow-passage system and controls unsteady flow in both open channels. Comparisons of results include normal operating regimes. The agreement between computed and measured results is reasonable.

  19. Moving HammerCloud to CERN's private cloud

    CERN Document Server

    Barrand, Quentin

    2013-01-01

    HammerCloud is a testing framework for the Worldwide LHC Computing Grid. Currently deployed on about 20 hand-managed machines, it was desirable to move it to the Agile Infrastructure, CERN's OpenStack-based private cloud.

  20. Physics-Based Pneumatic Hammer Instability Model, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this project is to develop a physics-based pneumatic hammer instability model that accurately predicts the stability of hydrostatic bearings...

  1. Solenoid hammer valve developed for quick-opening requirements

    Science.gov (United States)

    Wrench, E. H.

    1967-01-01

    Quick-opening lightweight solenoid hammer valve requires a low amount of electrical energy to open, and closes by the restoring action of the mechanical springs. This design should be applicable to many quick-opening requirements in fluid systems.

  2. Theoretical calculation possibilities of the computer code HAMMER

    International Nuclear Information System (INIS)

    Onusic Junior, J.

    1978-06-01

    With the aim to know the theoretical calculation possibilities of the computer code HAMMER, developed at Savanah River Laboratory, a analysis of the crytical cells assembly of the kind utilized in PWR reactors is made. (L.F.S.) [pt

  3. System and method for damping vibration in a drill string

    Science.gov (United States)

    Wassell, Mark Ellsworth; Turner, William Evans; Burgess, Daniel E; Perry, Carl Allison

    2014-03-04

    A system for damping vibration in a drill string can include a valve assembly having a supply of a fluid, a first member, and a second member capable of moving in relation to first member in response to vibration of the drill bit. The first and second members define a first and a second chamber for holding the fluid. Fluid can flow between the first and second chambers in response to the movement of the second member in relation to the first member. The valve assembly can also include a coil or a valve for varying a resistance of the fluid to flow between the first and second chambers.

  4. Pressurized water-reactor feedwater piping response to water hammer

    International Nuclear Information System (INIS)

    Arthur, D.

    1978-03-01

    The nuclear power industry is interested in steam-generator water hammer because it has damaged the piping and components at pressurized water reactors (PWRs). Water hammer arises when rapid steam condensation in the steam-generator feedwater inlet of a PWR causes depressurization, water-slug acceleration, and slug impact at the nearest pipe elbow. The resulting pressure pulse causes the pipe system to shake, sometimes violently. The objective of this study is to evaluate the potential structural effects of steam-generator water hammer on feedwater piping. This was accomplished by finite-element computation of the response of two sections of a typical feedwater pipe system to four representative water-hammer pulses. All four pulses produced high shear and bending stresses in both sections of pipe. Maximum calculated pipe stresses varied because the sections had different characteristics and were sensitive to boundary-condition modeling

  5. Fluid dynamic interaction between water hammer and centrifugal pumps

    International Nuclear Information System (INIS)

    Ismaier, A.; Schluecker, E.

    2009-01-01

    Centrifugal pumps generate in piping systems noticeable pressure pulsations. In this paper the dynamic interaction between water hammer and pressure pulsations is presented. The experimental investigations were performed at a piping system with nominal diameter DN 100 (respectively NPS 4) and 75 m total length, built at the Institute for Process Technology and Machinery. Different measurements at this testing facility show that pulsating centrifugal pumps can damp pressure surges generated by fast valve closing. It is also shown that 1-dimensional fluid codes can be used to calculate this phenomenon. Furthermore it is presented that pressure surges pass centrifugal pumps almost unhindered, because they are hydraulic open.

  6. Trace elements in a North Sea drill core

    DEFF Research Database (Denmark)

    Kunzendorf, Helmar; Gwozdz, R.; Svendsen, N.

    1986-01-01

    , V, Sr, Dy, Mg, Ti, Ba and Eu. The major elements Ca and Al could be related to petrophysical parameters, particularly Al which shows a correlation with the silicification/argillaceous content. Na (and Cl) has a low content in the hydrocarbon-bearing section of the drill core suggesting that the pore......Chalk samples, systematically taken along a drill core from one of the hydrocarbon producing fields of the North Sea (Tyra field), were analysed by a neutron activation technique involving measurement of radioisotopes with relatively short half-lives. Elements determined include Na, Al, Cl, Ca, Mn...... space is filled mainly by hydrocarbons. A significant decrease of Mn with depth probably suggests diagenesis of chalk prior to, or with, hydrocarbon emplacement. Investigations of drilling fluids and cuttings reveal a strong contamination of the latter, mainly by Ba. Chalk data from comparable onshore...

  7. A Proposed Mechanism for Development of CTE Following Concussive Events: Head Impact, Water Hammer Injury, Neurofilament Release, and Autoimmune Processes.

    Science.gov (United States)

    Kornguth, Steven; Rutledge, Neal; Perlaza, Gabe; Bray, James; Hardin, Allen

    2017-12-19

    During the past decade, there has been an increasing interest in early diagnosis and treatment of traumatic brain injuries (TBI) that lead to chronic traumatic encephalopathy (CTE). The subjects involved range from soldiers exposed to concussive injuries from improvised explosive devices (IEDs) to a significant number of athletes involved in repetitive high force impacts. Although the forces from IEDs are much greater by a magnitude than those from contact sports, the higher frequency associated with contact sports allows for more controlled assessment of the mechanism of action. In our study, we report findings in university-level women soccer athletes followed over a period of four and a half years from accession to graduation. Parameters investigated included T1-, T2-, and susceptibility-weighted magnetic resonance images (SWI), IMPACT (Immediate Post-Concussion Assessment and Cognitive Testing), and C3 Logix behavioral and physiological assessment measures. The MRI Studies show several significant findings: first, a marked increase in the width of sulci in the frontal to occipital cortices; second, an appearance of subtle hemorrhagic changes at the base of the sulci; third was a sustained reduction in total brain volume in several soccer players at a developmental time when brain growth is generally seen. Although all of the athletes successfully completed their college degree and none exhibited long term clinical deficits at the time of graduation, the changes documented by MRI represent a clue to the pathological mechanism following an injury paradigm. The authors propose that our findings and those of prior publications support a mechanism of injury in CTE caused by an autoimmune process associated with the release of neural proteins from nerve cells at the base of the sulcus from a water hammer injury effect. As evidence accumulates to support this hypothesis, there are pharmacological treatment strategies that may be able to mitigate the development of

  8. A Proposed Mechanism for Development of CTE Following Concussive Events: Head Impact, Water Hammer Injury, Neurofilament Release, and Autoimmune Processes

    Directory of Open Access Journals (Sweden)

    Steven Kornguth

    2017-12-01

    Full Text Available During the past decade, there has been an increasing interest in early diagnosis and treatment of traumatic brain injuries (TBI that lead to chronic traumatic encephalopathy (CTE. The subjects involved range from soldiers exposed to concussive injuries from improvised explosive devices (IEDs to a significant number of athletes involved in repetitive high force impacts. Although the forces from IEDs are much greater by a magnitude than those from contact sports, the higher frequency associated with contact sports allows for more controlled assessment of the mechanism of action. In our study, we report findings in university-level women soccer athletes followed over a period of four and a half years from accession to graduation. Parameters investigated included T1-, T2-, and susceptibility-weighted magnetic resonance images (SWI, IMPACT (Immediate Post-Concussion Assessment and Cognitive Testing, and C3 Logix behavioral and physiological assessment measures. The MRI Studies show several significant findings: first, a marked increase in the width of sulci in the frontal to occipital cortices; second, an appearance of subtle hemorrhagic changes at the base of the sulci; third was a sustained reduction in total brain volume in several soccer players at a developmental time when brain growth is generally seen. Although all of the athletes successfully completed their college degree and none exhibited long term clinical deficits at the time of graduation, the changes documented by MRI represent a clue to the pathological mechanism following an injury paradigm. The authors propose that our findings and those of prior publications support a mechanism of injury in CTE caused by an autoimmune process associated with the release of neural proteins from nerve cells at the base of the sulcus from a water hammer injury effect. As evidence accumulates to support this hypothesis, there are pharmacological treatment strategies that may be able to mitigate the

  9. Analytical solution and numerical study on water hammer in a pipeline closed with an elastically attached valve

    Science.gov (United States)

    Henclik, Sławomir

    2018-03-01

    The influence of dynamic fluid-structure interaction (FSI) onto the course of water hammer (WH) can be significant in non-rigid pipeline systems. The essence of this effect is the dynamic transfer of liquid energy to the pipeline structure and back, which is important for elastic structures and can be negligible for rigid ones. In the paper a special model of such behavior is analyzed. A straight pipeline with a steady flow, fixed to the floor with several rigid supports is assumed. The transient is generated by a quickly closed valve installed at the end of the pipeline. FSI effects are assumed to be present mainly at the valve which is fixed with a spring dash-pot attachment. Analysis of WH runs, especially transient pressure changes, for various stiffness and damping parameters of the spring dash-pot valve attachment is presented in the paper. The solutions are found analytically and numerically. Numerical results have been computed with the use of an own computer program developed on the basis of the four equation model of WH-FSI and the specific boundary conditions formulated at the valve. Analytical solutions have been found with the separation of variables method for slightly simplified assumptions. Damping at the dash-pot is taken into account within the numerical study. The influence of valve attachment parameters onto the WH courses was discovered and it was found the transient amplitudes can be reduced. Such a system, elastically attached shut-off valve in a pipeline or other, equivalent design can be a real solution applicable in practice.

  10. Drilling-induced borehole-wall damage at spent fuel test-climax

    International Nuclear Information System (INIS)

    Weed, H.C.; Durham, W.B.

    1982-12-01

    Microcracks in a sample of quartz monzonite from the Spent Fuel Test-Climax were measured by means of a scanning electron microscope in order to estimate the background level of damage near the borehole-wall. It appears that the hammer-drilling operation used to create the borehole has caused some microfracturing in a region 10 to 30 mm wide around the borehole. Beyond 30 mm, the level of microfracturing cannot be distinguished from background

  11. Quantitative evaluation of hand cranking a roller pump in a crisis management drill.

    Science.gov (United States)

    Tomizawa, Yasuko; Tokumine, Asako; Ninomiya, Shinji; Momose, Naoki; Matayoshi, Toru

    2008-01-01

    The heart-lung machines for open-heart surgery have improved over the past 50 years; they rarely break down and are almost always equipped with backup batteries. The hand-cranking procedure only becomes necessary when a pump breaks down during perfusion or after the batteries have run out. In this study, the performance of hand cranking a roller pump was quantitatively assessed by an objective method using the ECCSIM-Lite educational simulator system. A roller pump connected to an extracorporeal circuit with an oxygenator and with gravity venous drainage was used. A flow sensor unit consisting of electromagnetic sensors was used to measure arterial and venous flow rates, and a built-in pressure sensor was used to measure the water level in the reservoir. A preliminary study of continuous cranking by a team of six people was conducted as a surprise drill. This system was then used at a perfusion seminar. At the seminar, 1-min hand-cranking drills were conducted by volunteers according to a prepared scenario. The data were calculated on site and trend graphs of individual performances were given to the participants as a handout. Preliminary studies showed that each person's performance was different. Results from 1-min drills showed that good performance was not related to the number of clinical cases experienced, years of practice, or experience in hand cranking. Hand cranking to maintain the target flow rate could be achieved without practice; however, manipulating the venous return clamp requires practice. While the necessity of performing hand cranking during perfusion due to pump failure is rare, we believe that it is beneficial for perfusionists and patients to include hand-cranking practice in periodic extracorporeal circulation crisis management drills because a drill allows perfusionists to mentally rehearse the procedures should such a crisis occur.

  12. Drilling and well technology

    Energy Technology Data Exchange (ETDEWEB)

    Milheim, K. [Mining University Leoben Institute for Drilling Technology, (Austria)

    1996-12-31

    Over a billion dollars a year is lost by exploration and production companies drilling wells because of the lack of learn curve management (LMC) practices. This paper presents the importance of the LMC concept, what it is, why LMC has not yet been recognized as a major initiative for improving drilling cost performance. The paper discusses the different types of planning, problems with implementation of plans, the use and misuse of drilling results and data bases, and the lack of post analysis practices. The major point of the paper is to show the massive savings that can be achieved by valuing LMC, learning LMC and successfully implementing LMC. . 2 refs., 5 figs.

  13. Pump-stopping water hammer simulation based on RELAP5

    International Nuclear Information System (INIS)

    Yi, W S; Jiang, J; Li, D D; Lan, G; Zhao, Z

    2013-01-01

    RELAP5 was originally designed to analyze complex thermal-hydraulic interactions that occur during either postulated large or small loss-of-coolant accidents in PWRs. However, as development continued, the code was expanded to include many of the transient scenarios that might occur in thermal-hydraulic systems. The fast deceleration of the liquid results in high pressure surges, thus the kinetic energy is transformed into the potential energy, which leads to the temporary pressure increase. This phenomenon is called water hammer. Generally water hammer can occur in any thermal-hydraulic systems and it is extremely dangerous for the system when the pressure surges become considerably high. If this happens and when the pressure exceeds the critical pressure that the pipe or the fittings along the pipeline can burden, it will result in the failure of the whole pipeline integrity. The purpose of this article is to introduce the RELAP5 to the simulation and analysis of water hammer situations. Based on the knowledge of the RELAP5 code manuals and some relative documents, the authors utilize RELAP5 to set up an example of water-supply system via an impeller pump to simulate the phenomena of the pump-stopping water hammer. By the simulation of the sample case and the subsequent analysis of the results that the code has provided, we can have a better understand of the knowledge of water hammer as well as the quality of the RELAP5 code when it's used in the water-hammer fields. In the meantime, By comparing the results of the RELAP5 based model with that of other fluid-transient analysis software say, PIPENET. The authors make some conclusions about the peculiarity of RELAP5 when transplanted into water-hammer research and offer several modelling tips when use the code to simulate a water-hammer related case

  14. Pump-stopping water hammer simulation based on RELAP5

    Science.gov (United States)

    Yi, W. S.; Jiang, J.; Li, D. D.; Lan, G.; Zhao, Z.

    2013-12-01

    RELAP5 was originally designed to analyze complex thermal-hydraulic interactions that occur during either postulated large or small loss-of-coolant accidents in PWRs. However, as development continued, the code was expanded to include many of the transient scenarios that might occur in thermal-hydraulic systems. The fast deceleration of the liquid results in high pressure surges, thus the kinetic energy is transformed into the potential energy, which leads to the temporary pressure increase. This phenomenon is called water hammer. Generally water hammer can occur in any thermal-hydraulic systems and it is extremely dangerous for the system when the pressure surges become considerably high. If this happens and when the pressure exceeds the critical pressure that the pipe or the fittings along the pipeline can burden, it will result in the failure of the whole pipeline integrity. The purpose of this article is to introduce the RELAP5 to the simulation and analysis of water hammer situations. Based on the knowledge of the RELAP5 code manuals and some relative documents, the authors utilize RELAP5 to set up an example of water-supply system via an impeller pump to simulate the phenomena of the pump-stopping water hammer. By the simulation of the sample case and the subsequent analysis of the results that the code has provided, we can have a better understand of the knowledge of water hammer as well as the quality of the RELAP5 code when it's used in the water-hammer fields. In the meantime, By comparing the results of the RELAP5 based model with that of other fluid-transient analysis software say, PIPENET. The authors make some conclusions about the peculiarity of RELAP5 when transplanted into water-hammer research and offer several modelling tips when use the code to simulate a water-hammer related case.

  15. Drill and Blast Performance Evaluation at the Obra Pit of Chirano ...

    African Journals Online (AJOL)

    This paper investigates the causes of inefficient fragmentation and formation of toes in the Obra pit of Chirano Gold Mines Ltd and recommends best practices in order to produce optimum fragmentation to feed the crusher at a reduced cost and to provide good working pit floors. The methods employed included: drilling ...

  16. Statistical guidelines for planning a limited drilling program

    International Nuclear Information System (INIS)

    Campbell, K.

    1988-06-01

    Site characterization for potential nuclear waste repository at Yucca Mountain in south-central Nevada will include the construction of a limited number of new drill holes to depths below the repository horizon from which information about the properties of the surrounding and underlying tuffs can be obtained. Quantitative techniques to estimate the amount of information to be gained from a proposed drilling plan are developed. These estimates are to be compared with economic costs and with risk analysis requirements for the potential repository. In some cases the existing data, although extremely limited, are sufficient for preliminary application of these methods. 33 refs., 19 figs., 3 tabs

  17. Treatise on water hammer in hydropower standards and guidelines

    International Nuclear Information System (INIS)

    Bergant, A; Mazij, J; Karney, B; Pejović, S

    2014-01-01

    This paper reviews critical water hammer parameters as they are presented in official hydropower standards and guidelines. A particular emphasize is given to a number of IEC standards and guidelines that are used worldwide. The paper critically assesses water hammer control strategies including operational scenarios (closing and opening laws), surge control devices (surge tank, pressure regulating valve, flywheel, etc.), redesign of the water conveyance system components (tunnel, penstock), or limitation of operating conditions (limited operating range) that are variably covered in standards and guidelines. Little information is given on industrial water hammer models and solutions elsewhere. These are briefly introduced and discussed in the light of capability (simple versus complex systems), availability of expertise (in house and/or commercial) and uncertainty. The paper concludes with an interesting water hammer case study referencing the rules and recommendations from existing hydropower standards and guidelines in a view of effective water hammer control. Recommendations are given for further work on development of a special guideline on water hammer (hydraulic transients) in hydropower plants

  18. Treatise on water hammer in hydropower standards and guidelines

    Science.gov (United States)

    Bergant, A.; Karney, B.; Pejović, S.; Mazij, J.

    2014-03-01

    This paper reviews critical water hammer parameters as they are presented in official hydropower standards and guidelines. A particular emphasize is given to a number of IEC standards and guidelines that are used worldwide. The paper critically assesses water hammer control strategies including operational scenarios (closing and opening laws), surge control devices (surge tank, pressure regulating valve, flywheel, etc.), redesign of the water conveyance system components (tunnel, penstock), or limitation of operating conditions (limited operating range) that are variably covered in standards and guidelines. Little information is given on industrial water hammer models and solutions elsewhere. These are briefly introduced and discussed in the light of capability (simple versus complex systems), availability of expertise (in house and/or commercial) and uncertainty. The paper concludes with an interesting water hammer case study referencing the rules and recommendations from existing hydropower standards and guidelines in a view of effective water hammer control. Recommendations are given for further work on development of a special guideline on water hammer (hydraulic transients) in hydropower plants.

  19. Dynamic Brazilian Test of Rock Under Intermediate Strain Rate: Pendulum Hammer-Driven SHPB Test and Numerical Simulation

    Science.gov (United States)

    Zhu, W. C.; Niu, L. L.; Li, S. H.; Xu, Z. H.

    2015-09-01

    The tensile strength of rock subjected to dynamic loading constitutes many engineering applications such as rock drilling and blasting. The dynamic Brazilian test of rock specimens was conducted with the split Hopkinson pressure bar (SHPB) driven by pendulum hammer, in order to determine the indirect tensile strength of rock under an intermediate strain rate ranging from 5.2 to 12.9 s-1, which is achieved when the incident bar is impacted by pendulum hammer with different velocities. The incident wave excited by pendulum hammer is triangular in shape, featuring a long rising time, and it is considered to be helpful for achieving a constant strain rate in the rock specimen. The dynamic indirect tensile strength of rock increases with strain rate. Then, the numerical simulator RFPA-Dynamics, a well-recognized software for simulating the rock failure under dynamic loading, is validated by reproducing the Brazilian test of rock when the incident stress wave retrieved at the incident bar is input as the boundary condition, and then it is employed to study the Brazilian test of rock under the higher strain rate. Based on the numerical simulation, the strain-rate dependency of tensile strength and failure pattern of the Brazilian disc specimen under the intermediate strain rate are numerically simulated, and the associated failure mechanism is clarified. It is deemed that the material heterogeneity should be a reason for the strain-rate dependency of rock.

  20. Making Safe Surgery Affordable: Design of a Surgical Drill Cover System for Scale.

    Science.gov (United States)

    Buchan, Lawrence L; Black, Marianne S; Cancilla, Michael A; Huisman, Elise S; Kooyman, Jeremy J R; Nelson, Scott C; OʼHara, Nathan N; OʼBrien, Peter J; Blachut, Piotr A

    2015-10-01

    Many surgeons in low-resource settings do not have access to safe, affordable, or reliable surgical drilling tools. Surgeons often resort to nonsterile hardware drills because they are affordable, robust, and efficient, but they are impossible to sterilize using steam. A promising alternative is to use a Drill Cover system (a sterilizable fabric bag plus surgical chuck adapter) so that a nonsterile hardware drill can be used safely for surgical bone drilling. Our objective was to design a safe, effective, affordable Drill Cover system for scale in low-resource settings. We designed our device based on feedback from users at Mulago Hospital (Kampala, Uganda) and focused on 3 main aspects. First, the design included a sealed barrier between the surgical field and hardware drill that withstands pressurized fluid. Second, the selected hardware drill had a maximum speed of 1050 rpm to match common surgical drills and reduce risk of necrosis. Third, the fabric cover was optimized for ease of assembly while maintaining a sterile technique. Furthermore, with the Drill Cover approach, multiple Drill Covers can be provided with a single battery-powered drill in a "kit," so that the drill can be used in back-to-back surgeries without requiring immediate sterilization. The Drill Cover design presented here provides a proof-of-concept for a product that can be commercialized, produced at scale, and used in low-resource settings globally to improve access to safe surgery.

  1. Characteristics of laminar MHD fluid hammer in pipe

    International Nuclear Information System (INIS)

    Huang, Z.Y.; Liu, Y.J.

    2016-01-01

    As gradually wide applications of MHD fluid, transportation as well as control with pumps and valves is unavoidable, which induces MHD fluid hammer. The paper attempts to combine MHD effect and fluid hammer effect and to investigate the characteristics of laminar MHD fluid hammer. A non-dimensional fluid hammer model, based on Navier–Stocks equations, coupling with Lorentz force is numerically solved in a reservoir–pipe–valve system with uniform external magnetic field. The MHD effect is represented by the interaction number which associates with the conductivity of the MHD fluid as well as the external magnetic field and can be interpreted as the ratio of Lorentz force to Joukowsky force. The transient numerical results of pressure head, average velocity, wall shear stress, velocity profiles and shear stress profiles are provided. The additional MHD effect hinders fluid motion, weakens wave front and homogenizes velocity profiles, contributing to obvious attenuation of oscillation, strengthened line packing and weakened Richardson annular effect. Studying the characteristics of MHD laminar fluid hammer theoretically supplements the gap of knowledge of rapid-transient MHD flow and technically provides beneficial information for MHD pipeline system designers to better devise MHD systems. - Highlights: • Characteristics of laminar MHD fluid hammer are discussed by simulation. • MHD effect has significant influence on attenuation of wave. • MHD effect strengthens line packing. • MHD effect inhibits Richardson annular effect.

  2. Study on a Mechanical Semi-Active Heave Compensation System of Drill String for Use on Floating Drilling Platform

    Science.gov (United States)

    Liu, Qingyou; Tang, Yang; Huang, Chongjun; Xie, Chong

    2015-01-01

    There are some disadvantages for existing heave compensation systems of drill string used for the Floating Drilling Platform (FDP), including high energy consumption, large and complex structure, and expensive manufacturing and maintenance costs. In view of the above, we present a streamlined mechanical semi-active heave compensation system (MSAHC) in this study. This system consists of active compensation part with the pinion and rack and passive compensation part. In order to evaluate system performance of the MSAHC, we establish its simulation model with AMEsim software. In the process of simulation, displacement of rotary hook and energy consumption is regarded as performance parameters of the system. And the change rule of two performance parameters are analyzed by changing these design parameters including gear radius of the pinion and rack, scale coefficient of PID, rotary hook load, heave height and heave period of the FDP, and accumulator volume. Then, based on the simulation results of the MSAHC system performance, we have selected out a best set of design parameters from them. Moreover, the feasibility of the design scheme of the MSAHC is effectively verified by comparison with the existing three heave compensation system. The result shows that the energy consumption of the MSAHC is lower than the active heave compensation system (AHC) and the semi-active heave compensation system (SAHC) when achieving a same compensation effect as well as the accumulator volume of MSAHC is half of the passive heave compensation system (PHC). Therefore, the new designed MSAHC not only ensure compensation effect but also lower energy consumption, and its structure is simplified by adopting the simple mechanical structure to decrease manufacturing cost, maintenance cost and floor space. PMID:26186620

  3. Water hammer characteristics of integral pressurized water reactor primary loop

    International Nuclear Information System (INIS)

    Zuo, Qiaolin; Qiu, Suizheng; Lu, Wei; Tian, Wenxi; Su, Guanghui; Xiao, Zejun

    2013-01-01

    Highlights: • Water hammer models developed for IPWR primary loop using MOC. • Good agreement between the developed code and the experiment. • The good agreement between WAHAP and Flowmaster can validate the equations in WAHAP. • The primary loop of IPWR suffers from slight water hammer impact. -- Abstract: The present work discussed the single-phase water hammer phenomenon, which was caused by the four-pump-alternate startup in an integral pressurized water reactor (IPWR). A new code named water hammer program (WAHAP) was developed independently based on the method of characteristic to simulate hydraulic transients in the primary system of IPWR and its components such as reactor core, once-through steam generators (OTSG), the main coolant pumps and so on. Experimental validation for the correctness of the equations and models in WAHAP was carried out and the models fit the experimental data well. Some important variables were monitored including transient volume flow rates, opening angle of valve disc and pressure drop in valves. The water hammer commercial software Flowmaster V7 was also employed to compare with WAHAP and the good agreement can validate the equations in WAHAP. The transient results indicated that the primary loop of IPWR suffers from slight water hammer impact under pump switching conditions

  4. Water hammer characteristics of integral pressurized water reactor primary loop

    Energy Technology Data Exchange (ETDEWEB)

    Zuo, Qiaolin [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, Shanxi 710049 (China); Qiu, Suizheng, E-mail: szqiu@mail.xjtu.edu.cn [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, Shanxi 710049 (China); Lu, Wei; Tian, Wenxi; Su, Guanghui [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, Shanxi 710049 (China); Xiao, Zejun [Nuclear Power Institute of China, Chengdu, Sichuan 610041 (China)

    2013-08-15

    Highlights: • Water hammer models developed for IPWR primary loop using MOC. • Good agreement between the developed code and the experiment. • The good agreement between WAHAP and Flowmaster can validate the equations in WAHAP. • The primary loop of IPWR suffers from slight water hammer impact. -- Abstract: The present work discussed the single-phase water hammer phenomenon, which was caused by the four-pump-alternate startup in an integral pressurized water reactor (IPWR). A new code named water hammer program (WAHAP) was developed independently based on the method of characteristic to simulate hydraulic transients in the primary system of IPWR and its components such as reactor core, once-through steam generators (OTSG), the main coolant pumps and so on. Experimental validation for the correctness of the equations and models in WAHAP was carried out and the models fit the experimental data well. Some important variables were monitored including transient volume flow rates, opening angle of valve disc and pressure drop in valves. The water hammer commercial software Flowmaster V7 was also employed to compare with WAHAP and the good agreement can validate the equations in WAHAP. The transient results indicated that the primary loop of IPWR suffers from slight water hammer impact under pump switching conditions.

  5. Development and evaluation of a meter for measuring return line fluid flow rates during drilling

    Energy Technology Data Exchange (ETDEWEB)

    Loeppke, G.E.; Schafer, D.M.; Glowka, D.A.; Scott, D.D.; Wernig, M.D. (Sandia National Labs., Albuquerque, NM (United States)); Wright, E.K. (Ktech Corp., Albuquerque, NM (United States))

    1992-06-01

    The most costly problem routinely encountered in geothermal drilling is lost circulation, which occurs when drilling fluid is lost to the formation rather than circulating back to the surface. The successful and economical treatment of lost circulation requires the accurate measurement of drilling fluid flow rate both into and out of the well. This report documents the development of a meter for measuring drilling fluid outflow rates in the return line of a drilling rig. The meter employs a rolling counterbalanced float that rides on the surface of the fluid in the return line. The angle of the float pivot arm is sensed with a pendulum potentiometer, and the height of the float is calculated from this measurement. The float height is closely related to the fluid height and, therefore, the flow rate in the line. The prototype rolling float meter was extensively tested under laboratory conditions in the Wellbore Hydraulics Flow Facility; results from these tests were used in the design of the field prototype rolling float meter. The field prototype meter was tested under actual drilling conditions in August and September 1991 at the Long Valley Exploratory Well near Mammoth Lakes, Ca. In addition, the performance of several other commercially available inflow and outflow meters was evaluated in the field. The tested inflow meters included conventional pump stroke counters, rotary pump speed counters, magnetic flowmeters, and an ultrasonic Doppler flowmeter. On the return flow line, a standard paddlemeter, an acoustic level meter, and the prototype rolling float meter were evaluated for measuring drilling fluid outflow rates.

  6. [A study of linearity and reciprocity during shock applied with a hammer to human dry skull].

    Science.gov (United States)

    Kumazawa, Y; Sekiguchi, J; Saito, M; Honma, K; Toyoda, M; Matsuo, E

    1990-09-01

    The authors used a human dry skull on which the cranial bone mandible had been joined with an artificial articulator disk to form a single unit. Impact acceleration corresponding to weak and strong tapping was considered a dynamic load in examining the vibration transfer characteristics of the facial cranial bone when impact was applied from the mentum section in a situation designed to be closer to reality. Flexion injection type (resonance frequency f0 = 100 to 150 Hz, produced by GC Corp.) was applied to the human dry skull as an artificial periodontal membrane at thickness of 0.3 mm. In addition, Exaflex heavy body type (f0 = 400 Hz, produced by GC Corp.) was applied as an artificial disk. This was then placed on a damper produced by spreading a rubber dam sheet with a thickness of 35 microns on a tire tube with a diameter of 35 cm and an air pressure of 35 kg/cm2. Investigations were then made concerning linearity and reciprocity to determine whether an experimental system could be achieved or not. This was then followed by modal analysis. As a result, the following matters were ascertained: (1) The resonating area differed according to the extent of the force. (2) An increase in the viscoelastic elements of the silicon was accompanied by attenuation of force. (3) Directionality of force attenuation was caused by the complexity of bone structure. (4) A tapping force of 0.3G or 1G was sufficiently attenuated by the facial cranial bone. (5) The transfer function at the bone seams and thinner areas of the bones was insufficient for modal analysis of the facial region and total cranial bone of the human dry skull.

  7. Hammering Does Not Fit Fitts' Law

    Directory of Open Access Journals (Sweden)

    Tadej Petrič

    2017-05-01

    Full Text Available While movement is essential to human wellbeing, we are still unable to reproduce the deftness and robustness of human movement in automatons or completely restore function to individuals with many types of motor impairment. To better understand how the human nervous system plans and controls movements, neuromechanists employ simple tasks such as upper extremity reaches and isometric force tasks. However, these simple tasks rarely consider impacts and may not capture aspects of motor control that arise from real-world complexity. Here we compared existing models of motor control with the results of a periodic targeted impact task extended from Bernstein's seminal work: hammering a nail into wood. We recorded impact forces and kinematics from 10 subjects hammering at different frequencies and with hammers with different physical properties (mass and face area. We found few statistical differences in most measures between different types of hammer, demonstrating human robustness to minor changes in dynamics. Because human motor control is thought to obey optimality principles, we also developed a feedforward optimal simulation with a neuromechanically inspired cost function that reproduces the experimental data. However, Fitts' Law, which relates movement time to distance traveled and target size, did not match our experimental data. We therefore propose a new model in which the distance moved is a logarithmic function of the time to move that yields better results (R2 ≥ 0.99 compared to R2 ≥ 0.88. These results support the argument that humans control movement in an optimal way, but suggest that Fitts' Law may not generalize to periodic impact tasks.

  8. Comparative evaluation of recent water hammer events in light water reactors

    International Nuclear Information System (INIS)

    House, R.K.; Sursock, J.P.; Kim, J.H.

    1987-01-01

    Water hammer events that occurred in commercial U.S. light water reactors in the five-year period from 1981 to 1985 were surveyed, and a preliminary evaluation of the events was conducted. The information developed supplements a previous study which evaluated water hammer events in the twelve-year period from 1969 to 1981. The current study of water hammer events in the 1980's confirms that the rate of events remains relatively constant (less than 0.25 events per plant year) in both PWRs and BWRs. Although water hammer events are not normally considered a safety issue, the economic impact of the events on plant operations can be significant. One particular severe water hammer event is estimated to have cost the plant owner $10 million for repair and evaluation alone. A variety of key characteristics of the recent water hammer events are summarized to establish a basis for further study of preventative methods

  9. Hypothenar hammer syndrome and basilic bypass.

    Science.gov (United States)

    Chander, R K; Phair, J; Oza, P; Patel, M; Balar, N

    2014-12-01

    We report a case of hypothenar hammer syndrome. The case presents necessary diagnostic measures and discusses the etiology of this syndrome. Additionally, the case reviews treatments, which culminated in the eventual use of ulnar artery bypass with autogenous basilica vein to treat and resolve the ischemic fingers of the patient. © The Author(s) 2013 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  10. A wash fluid for drilling into a field

    Energy Technology Data Exchange (ETDEWEB)

    Belyakov, V M; Badzhurak, R F; Koptelova, Ye K; Rogovoy, V K; Sapozhnikov, N G

    1979-01-18

    A wash fluid is proposed, used in drilling wells in water and a content of 3-5% by weight starch products. To speed up destruction of the starch products, to the fluid are added amylolytic enzymes in the amount of 0.01-0.1 percent by weight of the starch products' weight. To lower the use of starch products, up to 3% clay can be added to the fluid. The wash fluid is prepared directly at the work site. Dry powder of modified starch is mixed with cold water until a colloidal solution is obtained. Such a wash fluid preserves the required structural-mechanical properties for 3-5 days, which ensures prompt drilling into the waterbearing layer and installation of the filter. Then, during the work process, 5-6 hours before the moment required for lowering the viscosity, to the wash fluid is added the amylolytic enzyme; under its influence, the starch molecules split up, and the viscosity drops sharply. Using this wash fluid enables a reduction in well construction times from the beginning of drilling to the end of development of the water-bearing layer, and a rise in outputs and well service lives by reducing sedimentation of the water-bearing formation and elimination of down times during work required while waiting for destruction of the starch wash fluid under natural conditions.

  11. An equation of movement for supporting a drilling machine

    Energy Technology Data Exchange (ETDEWEB)

    Totev, Sl

    1982-01-01

    Support of a drilling machine is examined and an equation of movement is written. The equation has an invariant form and may be used for theoretical study of support in order to determine the forces and to study the stability and endurance of the elements as a whole.

  12. Drilling fluid base oil biodegradation potential of a soil ...

    African Journals Online (AJOL)

    Staphylococcus sp. isolated from oil-contaminated soil was grown in 1% drilling fluid base oil, HDF- 2000, as a sole source of carbon and energy. The organism has strong affinity for the substrate, growing at the rate of 0.16 h-1. It uses adherence and emulsification as mechanisms for oil uptake. In a nutrient-rich marine ...

  13. Study for increasing micro-drill reliability by vibrating drilling

    International Nuclear Information System (INIS)

    Yang Zhaojun; Li Wei; Chen Yanhong; Wang Lijiang

    1998-01-01

    A study for increasing micro-drill reliability by vibrating drilling is described. Under the experimental conditions of this study it is observed, from reliability testing and the fitting of a life-distribution function, that the lives of micro-drills under ordinary drilling follow the log-normal distribution and the lives of micro-drills under vibrating drilling follow the Weibull distribution. Calculations for reliability analysis show that vibrating drilling can increase the lives of micro-drills and correspondingly reduce the scatter of drill lives. Therefore, vibrating drilling increases the reliability of micro-drills

  14. Automated Grid Monitoring for the LHCb Experiment Through HammerCloud

    CERN Document Server

    Dice, Bradley

    2015-01-01

    The HammerCloud system is used by CERN IT to monitor the status of the Worldwide LHC Computing Grid (WLCG). HammerCloud automatically submits jobs to WLCG computing resources, closely replicating the workflow of Grid users (e.g. physicists analyzing data). This allows computation nodes and storage resources to be monitored, software to be tested (somewhat like continuous integration), and new sites to be stress tested with a heavy job load before commissioning. The HammerCloud system has been in use for ATLAS and CMS experiments for about five years. This summer's work involved porting the HammerCloud suite of tools to the LHCb experiment. The HammerCloud software runs functional tests and provides data visualizations. HammerCloud's LHCb variant is written in Python, using the Django web framework and Ganga/DIRAC for job management.

  15. Development of a system to provide diagnostics-while-drilling.

    Energy Technology Data Exchange (ETDEWEB)

    Wise, Jack LeRoy; Jacobson, Ronald David; Finger, John Travis; Mansure, Arthur James; Knudsen, Steven Dell

    2003-06-01

    This report describes development of a system that provides high-speed, real-time downhole data while drilling. Background of the project, its benefits, major technical challenges, test planning, and test results are covered by relatively brief descriptions in the body of the report, with some topics presented in more detail in the attached appendices.

  16. Water hammers in direct contact heater systems

    International Nuclear Information System (INIS)

    Uffer, R.

    1983-01-01

    This paper discusses the causes and mitigation or prevention of water hammers occurring in direct contact heaters and their attached lines. These water hammers are generally caused by rapid pressure reductions in the heaters or by water lines not flowing full. Proper design and operating measures can prevent or mitigate water hammer occurrence. Water hammers often do not originate at the areas where damage is noted

  17. Water hammer reduces fouling during natural water ultrafiltration.

    Science.gov (United States)

    Broens, F; Menne, D; Pothof, I; Blankert, B; Roesink, H D W; Futselaar, H; Lammertink, R G H; Wessling, M

    2012-03-15

    Today's ultrafiltration processes use permeate flow reversal to remove fouling deposits on the feed side of ultrafiltration membranes. We report an as effective method: the opening and rapid closing of a valve on the permeate side of an ultrafiltration module. The sudden valve closure generates pressure fluctuations due to fluid inertia and is commonly known as "water hammer". Surface water was filtrated in hollow fiber ultrafiltration membranes with a small (5%) crossflow. Filtration experiments above sustainable flux levels (>125 l (m2h)(-1)) show that a periodic closure of a valve on the permeate side improves filtration performance as a consequence of reduced fouling. It was shown that this effect depends on flux and actuation frequency of the valve. The time period that the valve was closed proved to have no effect on filtration performance. The pressure fluctuations generated by the sudden stop in fluid motion due to the valve closure are responsible for the effect of fouling reduction. High frequency recording of the dynamic pressure evolution shows water hammer related pressure fluctuations to occur in the order of 0.1 bar. The pressure fluctuations were higher at higher fluxes (higher velocities) which is in agreement with the theory. They were also more effective at higher fluxes with respect to fouling mitigation. Copyright © 2011 Elsevier Ltd. All rights reserved.

  18. Endoscopically Assisted Drilling, Exposure of the Fundus through a Presigmoid Retrolabyrinthine Approach: A Cadaveric Feasibility Study.

    Science.gov (United States)

    Muelleman, Thomas; Shew, Matthew; Alvi, Sameer; Shah, Kushal; Staecker, Hinrich; Chamoun, Roukouz; Lin, James

    2018-01-01

    The presigmoid retrolabyrinthine approach to the cerebellopontine angle is traditionally described to not provide access to the internal auditory canal (IAC). We aimed to evaluate the extent of the IAC that could be exposed with endoscopically assisted drilling and to measure the percentage of the IAC that could be visualized with the microscope and various endoscopes after drilling had been completed. Presigmoid retrolabyrinthine approaches were performed bilaterally on 4 fresh cadaveric heads. We performed endoscopically assisted drilling to expose the fundus of the IAC, which resulted in exposure of the entire IAC in 8 of 8 temporal bone specimens. The microscope afforded a mean view of 83% (n = 8) of the IAC. The 0°, 30°, 45°, and 70° endoscope each afforded a view of 100% of the IAC in 8 of 8 temporal bone specimens. In conclusion, endoscopic drilling of the IAC of can provide an extradural means of exposing the entire length of the IAC while preserving the labyrinth.

  19. Observations on steam generator water hammer

    International Nuclear Information System (INIS)

    Hildebrandt, P.C.

    1979-01-01

    The present state of understanding of water hammer phenomena apparently does not permit analytically predicting the occurrence or consequence of water hammer, with any confidence, or conclusively evaluating the benefit associated with any particular action taken to ameliorate an existing or potential water hammer problem. Features or fixes are incorporated based on overwhelming the problem, and trial and error

  20. Insights into the radial water jet drilling technology – Application in a quarry

    Directory of Open Access Journals (Sweden)

    Thomas Reinsch

    2018-04-01

    Full Text Available In this context, we applied the radial water jet drilling (RJD technology to drill five horizontal holes into a quarry wall of the Gildehaus quarry close to Bad Bentheim, Germany. For testing the state-of-the-art jetting technology, a jetting experiment was performed to investigate the influence of geological heterogeneity on the jetting performance and the hole geometry, the influence of nozzle geometry and jetting pressure on the rate of penetration, and the possibility of localising the jetting nozzle utilizing acoustic activity. It is observed that the jetted holes can intersect fractures under varying angles, and the jetted holes do not follow a straight path when jetting at ambient surface condition. Cuttings from the jetting process retrieved from the holes can be used to estimate the reservoir rock permeability. Within the quarry, we did not observe a change in the rate of penetration due to jetting pressure variations. Acoustic monitoring was partially successful in estimating the nozzle location. Although the experiments were performed at ambient surface conditions, the results can give recommendations for a downhole application in deep wells. Keywords: Acoustic monitoring, Drilling performance, Trajectory, Permeability, Rock properties, Radial water jet drilling (RJD

  1. Drilling reorganizes

    Science.gov (United States)

    Richman, Barbara T.

    As the first in a proposed series of steps that would move scientific ocean drilling from its own niche within the National Science Foundation's (NSF) Directorate for Astronomical, Atmospheric, Earth, and Ocean Sciences (AAEO) into the agency's Division of Ocean Sciences, Grant Gross, division director, has been appointed acting director of the Office of Scientific Ocean Drilling (OSOD). Gross will retain the directorship of the division, which also is part of AAEO. Allen M. Shinn, Jr., OSOD director for nearly 2 years, has been reassigned effective July 10 to a position in NSF's Office of Planning and Resource Management.The move aims to tie drilling operations more closely to the science with which it is associated, Gross said. This first step is an organizational response to the current leaning toward using a commercial drilling vessel as the drilling platform, he said. Before the market for such commercial drill ships opened (Eos, February 22, 1983, p . 73), other ship options for scientific ocean drilling included refurbishing the aging Glomar Challenger or renovating, at great expense, the Glomar Explorer. A possible next step in the reorganization is to make OSOD the third section within the Ocean Sciences Division. Currently, the division is divided into the Oceanographic Facilities and Support Section and the Ocean Sciences Research Section.

  2. A History of Geothermal Energy Research and Development in the United States. Drilling 1976-2006

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-09-01

    This report, the second in a four-part series, summarizes significant research projects performed by the U.S. Department of Energy (DOE) over 30 years to overcome challenges in drilling and to make generation of electricity from geothermal resources more cost-competitive.

  3. Development of a High-Temperature Diagnostics-While-Drilling Tool

    Energy Technology Data Exchange (ETDEWEB)

    Blankenship, Douglas [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Chavira, David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Henfling, Joseph [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hetmaniak, Chris [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Huey, David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jacobson, Ron [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); King, Dennis [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Knudsen, Steve [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Mansure, A. J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Polsky, Yarom [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2009-01-01

    This report documents work performed in the second phase of the Diagnostics While-Drilling (DWD) project in which a high-temperature (HT) version of the phase 1 low-temperature (LT) proof-of-concept (POC) DWD tool was built and tested. Descriptions of the design, fabrication and field testing of the HT tool are provided.

  4. Planning additional drilling campaign using two-space genetic algorithm: A game theoretical approach

    Science.gov (United States)

    Kumral, Mustafa; Ozer, Umit

    2013-03-01

    Grade and tonnage are the most important technical uncertainties in mining ventures because of the use of estimations/simulations, which are mostly generated from drill data. Open pit mines are planned and designed on the basis of the blocks representing the entire orebody. Each block has different estimation/simulation variance reflecting uncertainty to some extent. The estimation/simulation realizations are submitted to mine production scheduling process. However, the use of a block model with varying estimation/simulation variances will lead to serious risk in the scheduling. In the medium of multiple simulations, the dispersion variances of blocks can be thought to regard technical uncertainties. However, the dispersion variance cannot handle uncertainty associated with varying estimation/simulation variances of blocks. This paper proposes an approach that generates the configuration of the best additional drilling campaign to generate more homogenous estimation/simulation variances of blocks. In other words, the objective is to find the best drilling configuration in such a way as to minimize grade uncertainty under budget constraint. Uncertainty measure of the optimization process in this paper is interpolation variance, which considers data locations and grades. The problem is expressed as a minmax problem, which focuses on finding the best worst-case performance i.e., minimizing interpolation variance of the block generating maximum interpolation variance. Since the optimization model requires computing the interpolation variances of blocks being simulated/estimated in each iteration, the problem cannot be solved by standard optimization tools. This motivates to use two-space genetic algorithm (GA) approach to solve the problem. The technique has two spaces: feasible drill hole configuration with minimization of interpolation variance and drill hole simulations with maximization of interpolation variance. Two-space interacts to find a minmax solution

  5. Subchondral drilling for articular cartilage repair: a systematic review of translational research.

    Science.gov (United States)

    Gao, Liang; Goebel, Lars K H; Orth, Patrick; Cucchiarini, Magali; Madry, Henning

    2018-05-03

    Articular cartilage defects may initiate osteoarthritis. Subchondral drilling, a widely applied clinical technique to treat small cartilage defects, does not yield cartilage regeneration. Various translational studies aiming to improve the outcome of drilling have been performed, however, a robust systematic analysis of its translational evidence has been still lacking. Here, we performed a systematic review of the outcome of subchondral drilling for knee cartilage repair in translational animal models. A total of 12 relevant publications studying 198 animals were identified, detailed study characteristics were extracted, and methodological quality and risk of bias were analyzed. Subchondral drilling was superior to defects untreated or treated with abrasion arthroplasty for cartilage repair in multiple translational models. Considerable subchondral bone changes were observed, including subchondral bone cysts and intralesional osteophytes. Furthermore, extensive alterations of the subchondral bone microarchitecture appeared in a temporal pattern in small and large animal models, together with specific topographic aspects of repair. Moreover, variable technical aspects directly affected the outcomes of osteochondral repair. The data from this systematic review indicate that subchondral drilling yields improved short-term structural articular cartilage repair compared with spontaneous repair in multiple small and large animal models. These results have important implications for future investigations aimed at an enhanced translation into clinical settings for the treatment of cartilage defects, highlighting the importance of considering specific aspects of modifiable variables such as improvements in the design and reporting of preclinical studies, together with the need to better understand the underlying mechanisms of cartilage repair following subchondral drilling. © 2018. Published by The Company of Biologists Ltd.

  6. Development of a Continuous Drill and Blast Tunneling Concept, Phase II

    Science.gov (United States)

    1974-05-01

    A spiral drilling pattern is described which offers high efficiency drill and blast tunnelling via frequent small blasts rather than occasional large blasts. Design work is presented for a machine which would stay at the face to provide essentially c...

  7. Fluoroscopy-Guided Percutaneous Vertebral Body Biopsy Using a Novel Drill-Powered Device: Technical Case Series

    International Nuclear Information System (INIS)

    Wallace, Adam N.; Pacheco, Rafael A.; Tomasian, Anderanik; Hsi, Andy C.; Long, Jeremiah; Chang, Randy O.; Jennings, Jack W.

    2016-01-01

    BackgroundA novel coaxial biopsy system powered by a handheld drill has recently been introduced for percutaneous bone biopsy. This technical note describes our initial experience performing fluoroscopy-guided vertebral body biopsies with this system, compares the yield of drill-assisted biopsy specimens with those obtained using a manual technique, and assesses the histologic adequacy of specimens obtained with drill assistance.MethodsMedical records of all single-level, fluoroscopy-guided vertebral body biopsies were reviewed. Procedural complications were documented according to the Society of Interventional Radiology classification. The total length of bone core obtained from drill-assisted biopsies was compared with that of matched manual biopsies. Pathology reports were reviewed to determine the histologic adequacy of specimens obtained with drill assistance.ResultsTwenty eight drill-assisted percutaneous vertebral body biopsies met study inclusion criteria. No acute complications were reported. Of the 86 % (24/28) of patients with clinical follow-up, no delayed complications were reported (median follow-up, 28 weeks; range 5–115 weeks). The median total length of bone core obtained from drill-assisted biopsies was 28 mm (range 8–120 mm). This was longer than that obtained from manual biopsies (median, 20 mm; range 5–45 mm; P = 0.03). Crush artifact was present in 11 % (3/28) of drill-assisted biopsy specimens, which in one case (3.6 %; 1/28) precluded definitive diagnosis.ConclusionsA drill-assisted, coaxial biopsy system can be used to safely obtain vertebral body core specimens under fluoroscopic guidance. The higher bone core yield obtained with drill assistance may be offset by the presence of crush artifact

  8. Fluoroscopy-Guided Percutaneous Vertebral Body Biopsy Using a Novel Drill-Powered Device: Technical Case Series

    Energy Technology Data Exchange (ETDEWEB)

    Wallace, Adam N., E-mail: wallacea@mir.wustl.edu; Pacheco, Rafael A., E-mail: pachecor@mir.wustl.edu; Tomasian, Anderanik, E-mail: tomasiana@mir.wustl.edu [Washington University School of Medicine, Mallinckrodt Institute of Radiology (United States); Hsi, Andy C., E-mail: hsia@path.wustl.edu [Washington University School of Medicine, Division of Anatomic Pathology, Department of Pathology & Immunology (United States); Long, Jeremiah, E-mail: longj@mir.wustl.edu [Washington University School of Medicine, Mallinckrodt Institute of Radiology (United States); Chang, Randy O., E-mail: changr@wusm.wustl.edu [Washington University School of Medicine (United States); Jennings, Jack W., E-mail: jenningsj@mir.wustl.edu [Washington University School of Medicine, Mallinckrodt Institute of Radiology (United States)

    2016-02-15

    BackgroundA novel coaxial biopsy system powered by a handheld drill has recently been introduced for percutaneous bone biopsy. This technical note describes our initial experience performing fluoroscopy-guided vertebral body biopsies with this system, compares the yield of drill-assisted biopsy specimens with those obtained using a manual technique, and assesses the histologic adequacy of specimens obtained with drill assistance.MethodsMedical records of all single-level, fluoroscopy-guided vertebral body biopsies were reviewed. Procedural complications were documented according to the Society of Interventional Radiology classification. The total length of bone core obtained from drill-assisted biopsies was compared with that of matched manual biopsies. Pathology reports were reviewed to determine the histologic adequacy of specimens obtained with drill assistance.ResultsTwenty eight drill-assisted percutaneous vertebral body biopsies met study inclusion criteria. No acute complications were reported. Of the 86 % (24/28) of patients with clinical follow-up, no delayed complications were reported (median follow-up, 28 weeks; range 5–115 weeks). The median total length of bone core obtained from drill-assisted biopsies was 28 mm (range 8–120 mm). This was longer than that obtained from manual biopsies (median, 20 mm; range 5–45 mm; P = 0.03). Crush artifact was present in 11 % (3/28) of drill-assisted biopsy specimens, which in one case (3.6 %; 1/28) precluded definitive diagnosis.ConclusionsA drill-assisted, coaxial biopsy system can be used to safely obtain vertebral body core specimens under fluoroscopic guidance. The higher bone core yield obtained with drill assistance may be offset by the presence of crush artifact.

  9. Deep Drilling and Sampling via the Wireline Auto-Gopher Driven by Piezoelectric Percussive Actuator and EM Rotary Motor

    Science.gov (United States)

    Bar-Cohen, Yoseph; Badescu, Mircea; Sherrit, Stewart; Zacny, Kris; Paulsen, Gale L; Beegle, Luther; Bao, Xiaoqi

    2012-01-01

    The ability to penetrate subsurfaces and perform sample acquisition at depths of meters is critical for future NASA in-situ exploration missions to bodies in the solar system, including Mars and Europa. A corer/sampler was developed with the goal of acquiring pristine samples by reaching depths on Mars beyond the oxidized and sterilized zone. To developed rotary-hammering coring drill, called Auto-Gopher, employs a piezoelectric actuated percussive mechanism for breaking formations and an electric motor rotates the bit to remove the powdered cuttings. This sampler is a wireline mechanism that is incorporated with an inchworm mechanism allowing thru cyclic coring and core removal to reach great depths. The penetration rate is being optimized by simultaneously activating the percussive and rotary motions of the Auto-Gopher. The percussive mechanism is based on the Ultrasonic/Sonic Drill/Corer (USDC) mechanism that is driven by piezoelectric stack and that was demonstrated to require low axial preload. The Auto-Gopher has been produced taking into account the a lessons learned from the development of the Ultrasonic/Sonic Gopher that was designed as a percussive ice drill and was demonstrated in Antarctica in 2005 to reach about 2 meters deep. A field demonstration of the Auto-Gopher is currently being planned with objective of reaching as deep as 3 to 5 meters in tufa subsurface.

  10. A study for a guide chart of lower and upper boundary regions to avoid the condensation-induced water hammer in a long horizontal pipe

    International Nuclear Information System (INIS)

    Lee, Byung Jin

    1995-02-01

    Effects of the key system parameters such as the pipe length, the pipe diameter, the feedwater temperature and the system pressure on the critical flow rates of both the upper and the lower boundaries have been examined for long horizontal pipes. The upper and lower critical flow rates are sensitive to the pipe diameter, the pipe length and the system pressure, but not to the feedwater temperature over the practical operating ranges. Guide charts of the CIWH region boundary have been developed to be used in the system design and operation to predict the operating conditions vulnerable to the CIWH. The charts illustrate a series of the operating ranges bounded by the lower and the upper limiting curves where the water hammer is very likely to occur. A design and operational procedure has also been provided to help the designer and the operator to avoid the CIWH

  11. Investigation on the Effect of a Pre-Center Drill Hole and Tool Material on Thrust Force, Surface Roughness, and Cylindricity in the Drilling of Al7075

    Directory of Open Access Journals (Sweden)

    Amir Hossein Ghasemi

    2018-01-01

    Full Text Available Drilling is one of the most useful metal cutting processes and is used in various applications, such as aerospace, electronics, and automotive. In traditional drilling methods, the thrust force, torque, tolerance, and tribology (surface roughness are related to the cutting condition and tool geometry. In this paper, the effects of a pre-center drill hole, tool material, and drilling strategy (including continuous and non-continuous feed on thrust force, surface roughness, and dimensional accuracy (cylindricity have been investigated. The results show that using pre-center drill holes leads to a reduction of the engagement force and an improvement in the surface quality and cylindricity. Non-continuous drilling reduces the average thrust force and cylindricity value, and High Speed Steels HSS-Mo (high steel speed + 5–8% Mo reduces the maximum quantity of cutting forces. Moreover, cylindricity is directly related to cutting temperature and is improved by using a non-continuous drilling strategy.

  12. Investigation on the Effect of a Pre-Center Drill Hole and Tool Material on Thrust Force, Surface Roughness, and Cylindricity in the Drilling of Al7075.

    Science.gov (United States)

    Ghasemi, Amir Hossein; Khorasani, Amir Mahyar; Gibson, Ian

    2018-01-16

    Drilling is one of the most useful metal cutting processes and is used in various applications, such as aerospace, electronics, and automotive. In traditional drilling methods, the thrust force, torque, tolerance, and tribology (surface roughness) are related to the cutting condition and tool geometry. In this paper, the effects of a pre-center drill hole, tool material, and drilling strategy (including continuous and non-continuous feed) on thrust force, surface roughness, and dimensional accuracy (cylindricity) have been investigated. The results show that using pre-center drill holes leads to a reduction of the engagement force and an improvement in the surface quality and cylindricity. Non-continuous drilling reduces the average thrust force and cylindricity value, and High Speed Steels HSS-Mo (high steel speed + 5-8% Mo) reduces the maximum quantity of cutting forces. Moreover, cylindricity is directly related to cutting temperature and is improved by using a non-continuous drilling strategy.

  13. Calibration of robotic drilling systems with a moving rail

    Directory of Open Access Journals (Sweden)

    Tian Wei

    2014-12-01

    Full Text Available Industrial robots are widely used in aircraft assembly systems such as robotic drilling systems. It is necessary to expand a robot’s working range with a moving rail. A method for improving the position accuracy of an automated assembly system with an industrial robot mounted on a moving rail is proposed. A multi-station method is used to control the robot in this study. The robot only works at stations which are certain positions defined on the moving rail. The calibration of the robot system is composed by the calibration of the robot and the calibration of the stations. The calibration of the robot is based on error similarity and inverse distance weighted interpolation. The calibration of the stations is based on a magnetic strip and a magnetic sensor. Validation tests were performed in this study, which showed that the accuracy of the robot system gained significant improvement using the proposed method. The absolute position errors were reduced by about 85% to less than 0.3 mm compared with the maximum nearly 2 mm before calibration.

  14. Slimhole drilling and directional drilling for on-site inspections under a Comprehensive Test Ban - An initial assessment

    International Nuclear Information System (INIS)

    Heuze, F.E.

    1995-07-01

    It appears that a short list of four suppliers should be further evaluated to formulate OSI-applicable packages. They are Baker-Hughes ESTTEQ, SLIMDRIL International, Halliburton Energy/ENSCO Technology, and Schlumberger-Dowell/Anadrill. It is noteworthy that all of them are headquartered in Houston, TX, making it a logical place to present the OSI requirements to a community of expert drillers. We have requested from these companies that they let us know of operations with coiled tubing to be conducted in California, so as to use such opportunities to view the systems in action. On such job was just completed by Schlumberger-Dowell near Bakersfield, and they have another one coming up in late July in Long Beach. An example of the 'footprint' of such a C-T drilling operation is shown. The Verification community also can take advantage of drilling conferences to keep up with the state-of-the-art. The next such meeting, co-sponsored by the International Association of Drilling Contractors (IADC) and the Society of Petroleum Engineers (SPE), is scheduled for March 12-15, 1996, in New Orleans. The next step in this study should be to determine an optimal combination of the new drilling methods with the health and safety procedures and the diagnostics which are required when drilling in a radioactive environment. This will involve bringing together the expertise of the NTS/National Laboratories with those of the exploration/production drillers. The final outcome will be the formulation of drilling systems which have significant cost and weight advantages over those of the equipment previously used at NTS

  15. Water hammer 2 phase analysis hydraulic system with a Kaplan turbine

    OpenAIRE

    Dudlik, A.; Koutnik, J.

    2009-01-01

    This investigation has been carried out for a case of sudden closing of a Kaplan turbine from a runaway operation. This work has been done at Fraunhofer UMSICHT, supported by VH. The runaway case has been selected as it is known that the discharge through a Kaplan turbine increases with its speed, and may reach up to twice the value of nominal discharge. The simulation model consists of: - penstock - Kaplan turbine (modelled with a valve characteristic) - draft tube All hydraulic pipe element...

  16. Novel Highly Efficient Compact Rotary-Hammering Planetary Sampler Actuated by a Single Piezoelectric Actuator

    Data.gov (United States)

    National Aeronautics and Space Administration — A wireless drive mechanism using elastic waves transmitted through walls without perforation has been established and thus revolutionized activation of spacecraft...

  17. Hammers and Nails: A response to Lindstrøm and Olsen & Witmore

    DEFF Research Database (Denmark)

    Sørensen, Tim Flohr

    2016-01-01

    Two contrasting arguments on the merits of symmetrical archaeology and an associated discussion of object agency appeared in a recent issue of Archaeological Dialogues (Lindstrøm 2015; Olsen and Witmore 2015). While Torill Christine Lindstrøm extends a thorough, yet hardly new, criticism of the n...... arguments and merits. Lastly, I take issue with Lindstrøm’s dismissal of ‘different ontologies’ as a result of political correctness....... by Lindstrøm and by Olsen and Witmore: first of all, I challenge Lindstrøm’s representation of object agency, which I believe is in need of corrections. Second, I contend that Lindstrøm fails to identify a number of fundamental contributions within the framework of symmetrical archaeology, thus allowing her...

  18. New optimized drill pipe size for deep-water, extended reach and ultra-deep drilling

    Energy Technology Data Exchange (ETDEWEB)

    Jellison, Michael J.; Delgado, Ivanni [Grant Prideco, Inc., Hoston, TX (United States); Falcao, Jose Luiz; Sato, Ademar Takashi [PETROBRAS, Rio de Janeiro, RJ (Brazil); Moura, Carlos Amsler [Comercial Perfuradora Delba Baiana Ltda., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    A new drill pipe size, 5-7/8 in. OD, represents enabling technology for Extended Reach Drilling (ERD), deep water and other deep well applications. Most world-class ERD and deep water wells have traditionally been drilled with 5-1/2 in. drill pipe or a combination of 6-5/8 in. and 5-1/2 in. drill pipe. The hydraulic performance of 5-1/2 in. drill pipe can be a major limitation in substantial ERD and deep water wells resulting in poor cuttings removal, slower penetration rates, diminished control over well trajectory and more tendency for drill pipe sticking. The 5-7/8 in. drill pipe provides a significant improvement in hydraulic efficiency compared to 5-1/2 in. drill pipe and does not suffer from the disadvantages associated with use of 6-5/8 in. drill pipe. It represents a drill pipe assembly that is optimized dimensionally and on a performance basis for casing and bit programs that are commonly used for ERD, deep water and ultra-deep wells. The paper discusses the engineering philosophy behind 5-7/8 in. drill pipe, the design challenges associated with development of the product and reviews the features and capabilities of the second-generation double-shoulder connection. The paper provides drilling case history information on significant projects where the pipe has been used and details results achieved with the pipe. (author)

  19. A comprehensive literature review reflecting fifteen years of debate regarding the representativity of reverse circulation vs blast hole drill sampling

    DEFF Research Database (Denmark)

    Engström, Karin

    2017-01-01

    Blast hole sampling is widely used for grade control by the mining industry all over the world, both in precious and base metal open pit mining. Blast hole (BH) samples are often regarded as inferior in comparison to “proper drill sampling” like reverse circulation (RC) and diamond (core) drilling...... (DD), and are accused of lacking representativity by the sampling community. The present paper aims at collecting all peer reviewed publications from 2000 onwards that concern open pit mine sampling performance of BH, RC and/or DD drill sampling. This will form a comprehensive literature review...

  20. The Hammer and the Anvil: The Need for A Comprehensive Southwest Border Security Strategy

    Science.gov (United States)

    2010-06-02

    ublic figures voiced concern about the “war on drugs,” the right level and kind of immigration, problems along the southwest border, migration , crises...thesis, Naval Postgraduate School, 2006), 1. 27 K. Larry Stores, Mexico-U.S. Dialogue on Migration and Border Issues 2001-2005, (Washington, DC...13 Seven organized crime families operate the drug trade in and from Mexico. The Sinaloa Federation is a cocaine smuggling organization headed by

  1. A semi-analytical study of stick-slip oscillations in drilling systems

    NARCIS (Netherlands)

    Besselink, B.; Wouw, van de N.; Nijmeijer, H.

    2011-01-01

    Rotary drilling systems are known to exhibit torsional stick-slip vibrations, which decrease drilling efficiency and accelerate the wear of drag bits. The mechanisms leading to these torsional vibrations are analyzed using a model that includes both axial and torsional drill string dynamics, which

  2. Advantages and limitations of remotely operated sea floor drill rigs

    Science.gov (United States)

    Freudenthal, T.; Smith, D. J.; Wefer, G.

    2009-04-01

    A variety of research targets in marine sciences including the investigation of gas hydrates, slope stability, alteration of oceanic crust, ore formation and palaeoclimate can be addressed by shallow drilling. However, drill ships are mostly used for deep drillings, both because the effort of building up a drill string from a drill ship to the deep sea floor is tremendous and control on drill bit pressure from a movable platform and a vibrating drill string is poor especially in the upper hundred meters. During the last decade a variety of remotely operated drill rigs have been developed, that are deployed on the sea bed and operated from standard research vessels. These developments include the BMS (Bentic Multicoring System, developed by Williamson and Associates, operated by the Japanese Mining Agency), the PROD (Portable Remotely Operated Drill, developed and operated by Benthic Geotech), the Rockdrill 2 (developed and operated by the British geological Survey) and the MeBo (German abbreviation for sea floor drill rig, developed and operated by Marum, University of Bremen). These drill rigs reach drilling depths between 15 and 100 m. For shallow drillings remotely operated drill rigs are a cost effective alternative to the services of drill ships and have the major advantage that the drilling operations are performed from a stable platform independent of any ship movements due to waves, wind or currents. Sea floor drill rigs can be deployed both in shallow waters and the deep sea. A careful site survey is required before deploying the sea floor drill rig. Slope gradient, small scale topography and soil strength are important factors when planning the deployment. The choice of drill bits and core catcher depend on the expected geology. The required drill tools are stored on one or two magazines on the drill rig. The MeBo is the only remotely operated drill rig world wide that can use wire line coring technique. This method is much faster than conventional

  3. Investigation of a North Sea oil platform drill cuttings pile

    International Nuclear Information System (INIS)

    Hartley, J.P.; Watson, T.N.

    1993-01-01

    A comprehensive study of the drill cuttings pile at North West Hutton was undertaken in August, 1992. Fifty one wells have been drilled in the field, mainly using mineral oil based drill fluids, with the cuttings discharged to sea. The cuttings pile was mapped using a 3D side scan sonar system and the periphery was defined by towed side scan sonar and gamma ray spectrometer surveys. The pile was cored by vibrocorer to a maximum depth of 2.35m. The cores were assessed geotechnically and subsampled for physical and chemical analyses. Environmental impact was investigated by grab sampling at 12 stations out to 7,500m, selected on the basis of cuttings distribution. The results are relevant to the corrosion and long-term environmental effects of oily cuttings piles, the remove/leave alone debate, and abandonment planning. The cores were subsampled for hydrocarbon, trace metals and sulphide content and grain size analysis. Metals analyses included identification of metal species to estimate bioavailability and implications of pile disturbance. Estimates of oil migration within the pile are made from correlation of the chemical analyses results with the drilling history, in particular the change from diesel to low toxicity base oil in 1984. Strong gradients were found in the faunal data which correlate well with the physical and chemical results. Dense populations of opportunists species were present adjacent to the platform, including a novel molluscan opportunist. This is the first comprehensive study of an oily cuttings pile and is a contribution to the debate on their long term impact and fate on abandonment

  4. A new design of automatic vertical drilling tool

    Directory of Open Access Journals (Sweden)

    Yanfeng Ma

    2015-09-01

    Full Text Available In order to effectively improve penetration rates and enhance wellbore quality for vertical wells, a new Automatic Vertical Drilling Tool (AVDT based on Eccentric Braced Structure (EBS is designed. Applying operating principle of rotary steering drilling, AVDT adds offset gravity block automatic induction inclination mechanism. When hole straightening happens, tools take essentric moment to be produced by gravity of offset gravity lock to control the bearing of guide force, so that well straightening is achieved. The normal tool's size of the AVDT is designed as 215.9 mm,other major components' sizes are worked out by the result of theoretical analysis, including the offset angle of EBS. This paper aims to introduce the structure, operating principle, theoretical analysis and describe the key components' parameters setting of the AVDT.

  5. Reconstruction of piano hammer force from string velocity.

    Science.gov (United States)

    Chaigne, Antoine

    2016-11-01

    A method is presented for reconstructing piano hammer forces through appropriate filtering of the measured string velocity. The filter design is based on the analysis of the pulses generated by the hammer blow and propagating along the string. In the five lowest octaves, the hammer force is reconstructed by considering two waves only: the incoming wave from the hammer and its first reflection at the front end. For the higher notes, four- or eight-wave schemes must be considered. The theory is validated on simulated string velocities by comparing imposed and reconstructed forces. The simulations are based on a nonlinear damped stiff string model previously developed by Chabassier, Chaigne, and Joly [J. Acoust. Soc. Am. 134(1), 648-665 (2013)]. The influence of absorption, dispersion, and amplitude of the string waves on the quality of the reconstruction is discussed. Finally, the method is applied to real piano strings. The measured string velocity is compared to the simulated velocity excited by the reconstructed force, showing a high degree of accuracy. A number of simulations are compared to simulated strings excited by a force derived from measurements of mass and acceleration of the hammer head. One application to an historic piano is also presented.

  6. Two-phase water hammer in nuclear power plants

    International Nuclear Information System (INIS)

    Kim, J.H.

    1987-01-01

    Water hammer events keep recurring in nuclear power plants. In the mid-1970s, water hammer was designated to be an unresolved safety issue (USI A-1) due to its high frequency of occurrence and the severity of the attendant damages. Between 1969 and 1981, a significant number of water hammer incidents (more than 12 events per year) involving BWRs and PWRs have been reported and evaluated. After intensive evaluations of the events, in late 1983, the U.S. Nuclear Regulatory Commission staff concluded that water hammer was not a serious contributor to the degradation of plant safety and it has been taken off the list of the unresolved safety issues. The frequency decreased to around 11 events per year between 1981 and 1985. Nevertheless, 11 events per year are still unacceptable high, especially in light of the financial losses caused by most events. Some events are not required to be reported. The number of the unreported events are estimated to be five to ten times as many as the reported events. The implication is that water hammer in nuclear power plants still needs attention and is a problem that has not been fundamentally resolved

  7. Screening reactor steam/water piping systems for water hammer

    International Nuclear Information System (INIS)

    Griffith, P.

    1997-09-01

    A steam/water system possessing a certain combination of thermal, hydraulic and operational states, can, in certain geometries, lead to a steam bubble collapse induced water hammer. These states, operations, and geometries are identified. A procedure that can be used for identifying whether an unbuilt reactor system is prone to water hammer is proposed. For the most common water hammer, steam bubble collapse induced water hammer, six conditions must be met in order for one to occur. These are: (1) the pipe must be almost horizontal; (2) the subcooling must be greater than 20 C; (3) the L/D must be greater than 24; (4) the velocity must be low enough so that the pipe does not run full, i.e., the Froude number must be less than one; (5) there should be void nearby; (6) the pressure must be high enough so that significant damage occurs, that is the pressure should be above 10 atmospheres. Recommendations on how to avoid this kind of water hammer in both the design and the operation of the reactor system are made

  8. CASING DRILLING TECHNOLOGY

    Directory of Open Access Journals (Sweden)

    Nediljka Gaurina-Međimurec

    2005-12-01

    Full Text Available Casing drilling is an alternative option to conventional drilling and uses standard oilfield casing instead of drillstring. This technology is one of the greatest developments in drilling operations. Casing drilling involves drilling and casing a well simultaneously. In casing driling process, downhole tools can be retrieved, through the casing on wire-line, meaning tool recovery or replacement of tools can take minutes versus hours under conventional methods. This process employs wireline-retrievable tools and a drill-lock assembly, permitting bit and BHA changes, coring, electrical logging and even directional or horizontal drilling. Once the casing point is reached, the casing is cemented in place without tripping pipe.

  9. Experimental investigation of the piano hammer-string interaction.

    Science.gov (United States)

    Birkett, Stephen

    2013-04-01

    Experimental techniques for investigating the piano hammer-string interaction are described. It is argued that the accuracy, consistency, and scope of conclusions of previous studies can be compromised by limitations of the conventional methods relating to key inputs; physical distortion; numerical distortion, particularly when differentiation or integration of measured signals is used to derive primary response variables; contact identification; and synchronization issues. These problems are discussed, and experimental methods that have been devised to avoid them are described and illustrated by detailed results from a study of the hammer-string interaction in a vertical piano. High resolution displacements are obtained directly by non-contact high-speed imaging and quantitative motion tracking. The attention focused on achieving very accurate and consistent temporal and spatial alignment, including the objective procedure used for contact identification, allows meaningful comparisons of responses from separate tests. String motion at the strike point and on each side of it, as well as hammer motion, is obtained for eight dynamic levels from 1.06 to 2.98 m/s impact velocity. Detailed observations of the force-compression behavior of the hammer interacting with real strings are presented. The direct effects of hammer shank deflection and agraffe string pulses on the interaction are also highlighted.

  10. High performance nature of biodegradable polymeric nanocomposites for oil-well drilling fluids

    Directory of Open Access Journals (Sweden)

    Tarek M. Madkour

    2016-06-01

    Full Text Available Multi-walled carbon nanotube (MWCNT and graphene nanoplatelet reinforced thermoplastic poly(lactic acid (PLA biodegradable nanocomposites were designed and prepared using solution casting techniques. The prepared biodegradable polymers are expected to provide an environmentally friendly alternative to petroleum-based polymers. Both nanocomposite systems exhibited better thermal stability and improved mechanical performance over the unreinforced polymer exhibiting excellent strength and degradability. The addition of graphene nanofiller in varied amounts was aimed to enhance the thermal and mechanical properties of the nanocomposites even further and incorporate the outstanding characteristics of graphene nanoplatelets into the nanocomposites. The polymeric nanocomposites showed also superior advantages for oil drilling relevances, automotive lubricating purposes, membrane technology and food packaging. Scanning electron microscopy images indicated a homogeneous dispersion of the nanofiller within the polymeric matrix at low filler loadings and a cluster formation at higher loadings that could be responsible for the polymeric matrix movement restrictions. The enthalpy of mixing (the polymer and the nanofiller measured could explain the cause of the repulsive interactions between the nanoparticles and the polymeric chains, which created an additional excluded volume that the polymeric segments were restricted to occupy, thus forcing the conformational characteristics of the polymeric chains to deviate away from those of the bulk chains. The prepared polymeric nano composites (poly lactic acid carbon nano tube and poly lactic acid graphene nanoplatelets were utilized in the formulation of oil-base mud as a viscosifier. The rheological, filtration properties and electrical stability of the oil based mud formulation with the new polymeric nanocomposite were studied and the result compared to the oil-based mud formulation with commercial viscosifier.

  11. Gas-Induced Water-hammer Loads Calculation for Safety Related Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Seungchan; Yoon, Dukjoo [Korea Hydro and Nuclear Power Co., LTd, Daejeon (Korea, Republic of); Lee, Dooyong [Seoul National Univ., Seoul (Korea, Republic of)

    2013-05-15

    Of particular interest, gas accumulation can result in system pressure transient in pump discharge piping following a pump start. Consequently, this evolves into a gas-water, a water-hammer event and the accompanying force imbalances on the piping segments can be sufficient to challenge the piping supports and restraint. This paper describes an method performing to the water-hammer loads to determine the maximum loading that would occur in the piping system following the safety injection signal and to evaluate its integrity. For a given gas void volumes in the discharge piping, the result of the calculation shows the maximum loads of 18,894.2psi, which is smaller than the allowable criteria. Also, the maximum peak axial force imbalances acting on the support is 1,720lbf as above.

  12. Gas-Induced Water-hammer Loads Calculation for Safety Related Systems

    International Nuclear Information System (INIS)

    Lee, Seungchan; Yoon, Dukjoo; Lee, Dooyong

    2013-01-01

    Of particular interest, gas accumulation can result in system pressure transient in pump discharge piping following a pump start. Consequently, this evolves into a gas-water, a water-hammer event and the accompanying force imbalances on the piping segments can be sufficient to challenge the piping supports and restraint. This paper describes an method performing to the water-hammer loads to determine the maximum loading that would occur in the piping system following the safety injection signal and to evaluate its integrity. For a given gas void volumes in the discharge piping, the result of the calculation shows the maximum loads of 18,894.2psi, which is smaller than the allowable criteria. Also, the maximum peak axial force imbalances acting on the support is 1,720lbf as above

  13. A bit faster : ReedHycalog focuses new drill bit technology on the needs of western Canadian drillers

    Energy Technology Data Exchange (ETDEWEB)

    Wells, P.

    2009-06-15

    ReedHycalog, a division of National Oilwell Varco Inc., is advancing its drill bit technology and is setting performance records in an effort to meet the needs of drillers in western Canada. This article described the company's new drill bit technology. Through its motor series polycrystalline diamond cutter (PDC) bits, ReedHycalog developed and commercialized several unique and proprietary drill bit features that reduced variations in torque. This lowered the risk of stick-slip while improving lateral stability, directional control and drilling efficiency. The design of the motor series bits was reviewed along with laboratory and field testing. Smooth torque was identified as one of the greatest challenges when drilling with a drill bit on a directional assembly. Test results revealed that there are 4 distinct characteristics for optimal steerable motor performance, such as smooth torque control components (TCC) that were specifically positioned in the cone of the bit to prevent cutter over engagement reducing in torque fluctuations for optimal tool face control; optimized cutter backrakes that provided high penetration rates in rotating mode, while TCCs were optimized to control torque when sliding; gauge inserts for lateral control that provided a low-friction bearing surface; and laterally exposed gauge cutters that cleaned up the hole in rotating mode, and a tapered upper section that reduced gauge pad interference while in sliding mode. The motor series bits performed extremely well in the vertical, build and horizontal intervals with multiple operators. 1 ref., 3 figs.

  14. Hypothenar hammer syndrome in sports.

    Science.gov (United States)

    Müller, L P; Rudig, L; Kreitner, K F; Degreif, J

    1996-01-01

    Repetitive blunt trauma or single severe trauma to the hypothenar region may lead to traumatic thrombosis of the distal ulnar artery (hypothenar hammer syndrome, HHS). In the sports-related literature we found and analysed isolated cases attributed to injuries sustained during sporting activities such as baseball, badminton, handball, football, frisbee, softball, karate, weight-lifting and hockey. Further, we report the case of an amateur golf player with ischaemic symptoms of his left hand, where angiography revealed filling defects in the digital arteries associated with a corkscrew-like configuration of the distal ulnar artery. Magnetic resonance imaging (MRI) scan demonstrated, at the level of the hamulus ossis hamati, accessory fibres of m. palmaris brevis forming a sling around the ulnar artery. Treatment by resection of the thrombosed a. ulnaris segment and replacement with an autologous vein graft resulted in complete relief of symptoms. Histological sections revealed partially organized thrombi adherent to the intimal surface with fragmentation of the internal elastic membrane, indicating a traumatic genesis. As the mechanism of injury, we suspected intensive golf playing with the grip style and subsequent motions leading to pressure injury of the hypothenar area and the underlying ulnar artery. Contraction of the anomalous muscle belly may have additionally compressed the artery, slowing down the arterial flow and promoting thrombosis. In most reported cases including our own, it took a relatively long time until the cause of the disease as traumatic was found and accepted. The initial repetitive blunt or single severe trauma initiating the HHS can easily be overlooked or ignored. After intimal damage of a. ulnaris, the beginning of symptoms may be prolonged and mislead one into thinking the cause is a collagen or vasospastic disease.

  15. Environmental effects of a discharge of drill cuttings contaminated with ester-based drilling muds in the North Sea

    International Nuclear Information System (INIS)

    Daan, R.; Booij, K.; Mulder, M.; Weerlee, E.M. van

    1996-01-01

    A field-monitoring program has been carried out to assess the environmental effects associated with drill cutting discharges at a drilling location in the North Sea, after drilling with ester-based muds. The study included a baseline survey just before drilling started and three postdrilling surveys, 1, 4, and 11 months after termination of drilling. During these surveys, ester concentrations and macrofauna densities were determined at distances between 75 and 3,000 m from the well. For the first and second postdrilling surveys, ester concentrations ranged between 2 and 4,700 mg·kg -1 dry sediment. During the third survey, esters were detected up to 200 m, with concentrations between 1 and 250 mg·kg -1 dry sediment. Between 500 and 3,000 m, ester concentrations were below detection level. The half-life was estimated as 133 d. This value reflects the composite effects of biodegradation and sediment relocation. During the second postdrilling survey, a reduced abundance as well as a reduced species richness of the macrofauna was observed up to 200 m from the well. Also, the presence of Capitella capitata was an obvious sign of disturbed sediment conditions in this area. A few species showed abundance gradients over the whole sampling transect and occurred in reduced abundance up to 500 or 1,000 m compared to the 3,000-m reference station. The third postdrilling survey clearly revealed effects at 75 to 200 m from the well. At distances ≥500 m, persistent effects could no longer be demonstrated. Although the results of the present study show that effects had not completely disappeared after 1 year, there are signs of recovery of the macrobenthos, because a reasonable number of species had recolonized the area in the vicinity of the well site, particularly at 200 m, in fairly high numbers

  16. Mitigating check valve slamming and subsequentwater hammer events for PPFS using MOC

    International Nuclear Information System (INIS)

    Tian Wenxi; Su Guanghui; Wang Gaopeng; Qiu Suizheng; Xiao Zejun

    2009-01-01

    The method of characteristic (MOC) was adopted to analyze the check valve-induced water hammer behaviors for a Parallel Pumps Feedwater System (PPFS) during the alternate startup process. The motion of check valve disc was simulated using inertial valve model. Transient parameters including the pressure oscillation, local flow velocity and slamming of the check valve disc etc. have been obtained. The results showed that severe slamming between the valve disc and valve seat occurred during the alternate startup of parallel pumps. The induced maximum pressure vibration amplitude is up to 5.0 MPa. The scheme of appending a damping torque to slow down the check valve closing speed was also performed to mitigate of water hammer. It has been numerically approved to be an effective approach. (authors)

  17. Mitigating check valve slamming and subsequentwater hammer events for PPFS using MOC

    Institute of Scientific and Technical Information of China (English)

    TIAN Wenxi; SU Guanghui; WANG Gaopeng; QIU Suizheng; XIAO Zejun

    2009-01-01

    The method of characteristic (MOC) was adopted to analyze the check valve-induced water hammer behaviors for a Parallel Pumps Feedwater System (PPFS) during the alternate startup process. The motion of check valve disc was simulated using inertial valve model. Transient parameters including the pressure oscillation, local flow velocity and slamming of the check valve disc etc. have been obtained. The results showed that severe slamming between the valve disc and valve seat occurred during the alternate startup of parallel pumps. The induced maximum pressure vibration amplitude is up to 5.0 MPa. The scheme of appending a damping torque to slow down the check valve closing speed was also performed to mitigate of water hammer. It has been numerically approved to be an effective approach.

  18. Specific Characteristics of Injuries Inflicted by Claw Hammer.

    Science.gov (United States)

    Buchaillet, Céline; Gaudin, Arnaud; Rougé-Maillart, Clotilde; Jousset, Nathalie

    2016-09-01

    Claw hammers have the specific characteristic of having two distinct ends: one a flat head of variable form, the other bifurcated. So the use of this tool as a blunt instrument will cause varying injuries. The authors present two clinical cases of assault with a claw hammer. Examinations revealed two types of wound. A first injury composed of integumentary lacerations and underlying bone injuries in terms of "shape" suggested the use of a blunt instrument. A second injury made up of damage showing two parallel wounds or two wounds located one in the extension of the other suggested the use of an object with a bifurcated end. The combination of both types of injury should alert examiners to the possibility of the use of a claw hammer in causing the injuries in order to help direct investigators in their investigations and in the search for the weapon used. © 2016 American Academy of Forensic Sciences.

  19. The Schmidt hammer as a relative-age dating tool and its potential for calibrated-age dating in Holocene glaciated environments

    Science.gov (United States)

    Shakesby, Richard A.; Matthews, John A.; Owen, Geraint

    2006-11-01

    The Schmidt hammer is a relatively cheap, portable, sturdy instrument with proven value over the last two decades or so in rapidly dating coarse inorganic deposits of diverse origins. Early views were that its dating role was limited to distinguishing recently exposed from much older. Typically, either a few sites of possibly different ages or occasional older surfaces amongst many young sites were studied. More recently, calibration curves based on individual R-value means from small numbers (2-4) of sites of known ages have been used to estimate the ages of undated sites. We present Schmidt hammer rebound ( R-) values from 28 'Little Ice Age' (and younger), 23 Preboreal and 7 Younger Dryas glaciated surfaces in southern Norway in order, first, to test rigorously the robustness of the instrument as a relative-age dating tool. Despite being obtained from different surfaces (moraines, glaciofluvial deposits and bedrock) and varied metamorphic lithologies, the R-value overall means and 95% confidence intervals for the 'Little Ice Age', Preboreal and Younger Dryas age categories (respectively, 60.0±1.6, 41.6±1.4 and 34.2±2.0) are statistically significantly different. Only two outlying sites in the two younger age categories have overlapping confidence intervals, demonstrating remarkable robustness in differentiating early- and late-Holocene surfaces. The distinction between Preboreal and Younger Dryas sites (with terminal dates factors, including some previously considered critical (instrument wear, operator bias, initial rock surface texture), which emerge either as less important than previously argued or as relatively unimportant, together with others previously unreported (e.g. long-term changes in lichen, soil, snow and vegetation covers). Third, we investigate the potential for calibrated-age dating by applying exploratory, linear rates of R-value decline to selected combinations of sites. The results suggest that error limits of ca ±700 to ±1600 years

  20. Computerized Hammer Sounding Interpretation for Concrete Assessment with Online Machine Learning.

    Science.gov (United States)

    Ye, Jiaxing; Kobayashi, Takumi; Iwata, Masaya; Tsuda, Hiroshi; Murakawa, Masahiro

    2018-03-09

    Developing efficient Artificial Intelligence (AI)-enabled systems to substitute the human role in non-destructive testing is an emerging topic of considerable interest. In this study, we propose a novel hammering response analysis system using online machine learning, which aims at achieving near-human performance in assessment of concrete structures. Current computerized hammer sounding systems commonly employ lab-scale data to validate the models. In practice, however, the response signal patterns can be far more complicated due to varying geometric shapes and materials of structures. To deal with a large variety of unseen data, we propose a sequential treatment for response characterization. More specifically, the proposed system can adaptively update itself to approach human performance in hammering sounding data interpretation. To this end, a two-stage framework has been introduced, including feature extraction and the model updating scheme. Various state-of-the-art online learning algorithms have been reviewed and evaluated for the task. To conduct experimental validation, we collected 10,940 response instances from multiple inspection sites; each sample was annotated by human experts with healthy/defective condition labels. The results demonstrated that the proposed scheme achieved favorable assessment accuracy with high efficiency and low computation load.

  1. A trial of evaluation of drill-out skill of the mastoid process using navigation log

    International Nuclear Information System (INIS)

    Komune, Shizuo

    2011-01-01

    An examination was performed to see the operative skill of drill-outing the mastoid process using the temporal bone model, for the ultimate purposes of defining ''its good skill'' and of the skill assessment from the educational aspect. Comparison was made between an otological doctor who routinely conducts the operation and a medical resident having no experience of the procedure, both of whom were belonging to Kyushu University. The bone model for training the procedure was manufactured from CT-data (Ono and Co., Ltd., Tokyo), and was drilled out with drill tip of 4 mm cutting bur by the two examinees above according to the operative navigation. The navigation system had been modified for its software (3D slicer, a free software) to record the spatial tip log 6 times/sec. Sites to be preserved from the bur cutting at finishing the operation were defined to be the sigmoid sinus, short bone of anvil, lateral semicircular canal and facial nerve. The distances of the tip trace of the doctor from those sites were found 1.97 to 2.69 mm while of the resident, -5.8 to 0.58 mm, where minus meant the excessive cutting. Swinging of doctor's bur was smaller than resident's. Thus it was suggested that the skill was quantitatively evaluable by the log of the drill tip and the examination by an increased number of examinees was thought to be meaningful. (author)

  2. Evaluation of the parameters affecting bone temperature during drilling using a three-dimensional dynamic elastoplastic finite element model.

    Science.gov (United States)

    Chen, Yung-Chuan; Tu, Yuan-Kun; Zhuang, Jun-Yan; Tsai, Yi-Jung; Yen, Cheng-Yo; Hsiao, Chih-Kun

    2017-11-01

    A three-dimensional dynamic elastoplastic finite element model was constructed and experimentally validated and was used to investigate the parameters which influence bone temperature during drilling, including the drill speed, feeding force, drill bit diameter, and bone density. Results showed the proposed three-dimensional dynamic elastoplastic finite element model can effectively simulate the temperature elevation during bone drilling. The bone temperature rise decreased with an increase in feeding force and drill speed, however, increased with the diameter of drill bit or bone density. The temperature distribution is significantly affected by the drilling duration; a lower drilling speed reduced the exposure duration, decreases the region of the thermally affected zone. The constructed model could be applied for analyzing the influence parameters during bone drilling to reduce the risk of thermal necrosis. It may provide important information for the design of drill bits and surgical drilling powers.

  3. An experimental result of surface roughness machining performance in deep hole drilling

    Directory of Open Access Journals (Sweden)

    Mohamad Azizah

    2016-01-01

    Full Text Available This study presents an experimental result of a deep hole drilling process for Steel material at different machining parameters which are feed rate (f, spindle speed (s, the depth of the hole (d and MQL, number of drops (m on surface roughness, Ra. The experiment was designed using two level full factorial design of experiment (DoE with centre points to collect surface roughness, Ra values. The signal to noise (S/N ratio analysis was used to discover the optimum level for each machining parameters in the experiment.

  4. Potential fatigue strength improvement of AA 5083-H111 notched parts by wire brush hammering: Experimental analysis and numerical simulation

    International Nuclear Information System (INIS)

    Sidhom, Naziha; Moussa, Naoufel Ben; Janeb, Sameh; Braham, Chedly; Sidhom, Habib

    2014-01-01

    Highlights: • Wire brush hammering increases by 20% the AA 5083-H111 notched parts fatigue limit. • Improvement of fatigue strength is related to the fatigue cracks nucleation. • Fatigue strength prediction accounts for wire brush hammering effects. - Abstract: The effects of milling as machining process and a post-machining treatment by wire-brush hammering, on the near surface layer characteristics of AA 5083-H111 were investigated. Surface texture, work-hardening and residual stress profiles were determined by roughness measurement, scanning electron microscope (SEM) examinations, microhardness and X-ray diffraction (XRD) measurements. The effects of surface preparation on the fatigue strength were assessed by bending fatigue tests performed on notched samples for two loading stress ratios R 0.1 and R 0.5 . It is found that the bending fatigue limit at R 0.1 and 10 7 cycles is 20% increased, with respect to the machined surface, by wire-brush hammering. This improvement was discussed on the basis of the role of surface topography, stabilized residual stress and work-hardening on the fatigue-crack network nucleation and growth. The effects biaxial residual stress field and surface work-hardening were taken into account in the finite element model. A multi-axial fatigue criterion was proposed to predict the fatigue strength of aluminum alloy notched parts for both machined and treated states

  5. Concrete density estimation by rebound hammer method

    International Nuclear Information System (INIS)

    Ismail, Mohamad Pauzi bin; Masenwat, Noor Azreen bin; Sani, Suhairy bin; Mohd, Shukri; Jefri, Muhamad Hafizie Bin; Abdullah, Mahadzir Bin; Isa, Nasharuddin bin; Mahmud, Mohamad Haniza bin

    2016-01-01

    Concrete is the most common and cheap material for radiation shielding. Compressive strength is the main parameter checked for determining concrete quality. However, for shielding purposes density is the parameter that needs to be considered. X- and -gamma radiations are effectively absorbed by a material with high atomic number and high density such as concrete. The high strength normally implies to higher density in concrete but this is not always true. This paper explains and discusses the correlation between rebound hammer testing and density for concrete containing hematite aggregates. A comparison is also made with normal concrete i.e. concrete containing crushed granite

  6. Slow drilling speeds for single-drill implant bed preparation. Experimental in vitro study.

    Science.gov (United States)

    Delgado-Ruiz, R A; Velasco Ortega, E; Romanos, G E; Gerhke, S; Newen, I; Calvo-Guirado, J L

    2018-01-01

    To evaluate the real-time bone temperature changes during the preparation of the implant bed with a single-drill protocol with different drill designs and different slow drilling speeds in artificial type IV bone. For this experimental in vitro study, 600 implant bed preparations were performed in 10 bovine bone disks using three test slow drilling speeds (50/150/300 rpm) and a control drilling speed (1200 rpm). The temperature at crestal and apical areas and time variations produced during drilling with three different drill designs with similar diameter and length but different geometry were recorded with real-life thermographic analysis. Statistical analysis was performed by two-way analysis of variance. Multiple comparisons of temperatures and time with the different drill designs and speeds were performed with the Tukey's test. T Max values for the control drilling speed with all the drill designs (D1 + 1200; D2 + 1200; D3 + 1200) were higher compared to those for the controls for 11 ± 1.32 °C (p drilling at 50 rpm resulted in the lowest temperature increment (22.11 ± 0.8 °C) compared to the other slow drilling speeds of 150 (24.752 ± 1.1 °C) and 300 rpm (25.977 ± 1.2 °C) (p drilling speeds compared to that for the control drilling speed. Slow drilling speeds required significantly more time to finish the preparation of the implant bed shown as follows: 50 rpm > 150 rpm > 300 rpm > control (p drill protocol with slow drilling speeds (50, 150, and 300 rpm) without irrigation in type IV bone increases the temperature at the coronal and apical levels but is below the critical threshold of 47 °C. The drill design in single-drill protocols using slow speeds (50, 150, and 300 rpm) does not have an influence on the thermal variations. The time to accomplish the implant bed preparation with a single-drill protocol in type IV bone is influenced by the drilling speed and not by the drill design. As the speed decreases, then

  7. Improving ATLAS computing resource utilization with HammerCloud

    CERN Document Server

    Schovancova, Jaroslava; The ATLAS collaboration

    2018-01-01

    HammerCloud is a framework to commission, test, and benchmark ATLAS computing resources and components of various distributed systems with realistic full-chain experiment workflows. HammerCloud contributes to ATLAS Distributed Computing (ADC) Operations and automation efforts, providing the automated resource exclusion and recovery tools, that help re-focus operational manpower to areas which have yet to be automated, and improve utilization of available computing resources. We present recent evolution of the auto-exclusion/recovery tools: faster inclusion of new resources in testing machinery, machine learning algorithms for anomaly detection, categorized resources as master vs. slave for the purpose of blacklisting, and a tool for auto-exclusion/recovery of resources triggered by Event Service job failures that is being extended to other workflows besides the Event Service. We describe how HammerCloud helped commissioning various concepts and components of distributed systems: simplified configuration of qu...

  8. A sampling study on rock properties affecting drilling rate index (DRI)

    Science.gov (United States)

    Yenice, Hayati; Özdoğan, Mehmet V.; Özfırat, M. Kemal

    2018-05-01

    Drilling rate index (DRI) developed in Norway is a very useful index in determining the drillability of rocks and even in performance prediction of hard rock TBMs and it requires special laboratory test equipment. Drillability is one of the most important subjects in rock excavation. However, determining drillability index from physical and mechanical properties of rocks is very important for practicing engineers such as underground excavation, drilling operations in open pit mining, underground mining and natural stone production. That is why many researchers have studied concerned with drillability to find the correlations between drilling rate index (DRI) and penetration rate, influence of geological properties on drillability prediction in tunneling, correlations between rock properties and drillability. In this study, the relationships between drilling rate index (DRI) and some physico-mechanical properties (Density, Shore hardness, uniaxial compressive strength (UCS, σc), Indirect tensile strength (ITS, σt)) of three different rock groups including magmatic, sedimentary and metamorphic were evaluated using both simple and multiple regression analysis. This study reveals the effects of rock properties on DRI according to different types of rocks. In simple regression, quite high correlations were found between DRI and uniaxial compressive strength (UCS) and also between DRI and indirect tensile strength (ITS) values. Multiple regression analyses revealed even higher correlations when compared to simple regression. Especially, UCS, ITS, Shore hardness (SH) and the interactions between them were found to be very effective on DRI values.

  9. A theory of operation of a hydraulic drilling machine with a distributor

    Energy Technology Data Exchange (ETDEWEB)

    Totev, S Kh; Tsvetkov, Kh K

    1982-01-01

    The moment of impact of a striker piston against a drilling instrument is studied. The basic parameters of the drilling machine are identified, including cycle length, piston travel, impact velocity and impact energy. Formulas are acquired for rating the cited parameters.

  10. Reliability of the input admittance of bowed-string instruments measured by the hammer method.

    Science.gov (United States)

    Zhang, Ailin; Woodhouse, Jim

    2014-12-01

    The input admittance at the bridge, measured by hammer testing, is often regarded as the most useful and convenient measurement of the vibrational behavior of a bowed string instrument. However, this method has been questioned, due especially to differences between human bowing and hammer impact. The goal of the research presented here is to investigate the reliability and accuracy of this classic hammer method. Experimental studies were carried out on cellos, with three different driving conditions and three different boundary conditions. Results suggest that there is nothing fundamentally different about the hammer method, compared to other kinds of excitation. The third series of experiments offers an opportunity to explore the difference between the input admittance measuring from one bridge corner to another and that of single strings. The classic measurement is found to give a reasonable approximation to that of all four strings. Some possible differences between the hammer method and normal bowing and implications of the acoustical results are also discussed.

  11. On the performances and wear of WC-diamond like carbon coated tools in drilling of CFRP/Titanium stacks

    Science.gov (United States)

    Boccarusso, L.; Durante, M.; Impero, F.; Minutolo, F. Memola Capece; Scherillo, F.; Squillace, A.

    2016-10-01

    The use of hybrid structures made of CFRP and titanium alloys is growing more and more in the last years in the aerospace industry due to the high strength to weight ratio. Because of their very different characteristics, the mechanical fastening represent the most effective joining technique for these materials. As a consequence, drilling process plays a key role in the assembly. The one shot drilling, i.e. the contemporary drilling of the stack of the two materials, seems to be the best option both in terms of time saving and assembly accuracy. Nevertheless, due to the considerable different machinability of fiber reinforced plastics and metallic materials, the one shot drilling is a critical process both for the holes quality and for the tools wear. This research was carried out to study the effectiveness of new generation tools in the drilling of CFRP/Titanium stacks. The tools are made of sintered grains of tungsten carbide (WC) in a binder of cobalt and coated with Diamond like carbon (DLC), and are characterized by a patented geometry; they mainly differ in parent WC grain size and binder percentage. Both the cutting forces and the wear phenomena were accurately investigated and the results were analyzed as a function of number of holes and their quality. The results show a clear increase of the cutting forces with the number of holes for all the used drilling tools. Moreover, abrasive wear phenomena that affect initially the tools coating layer were observed.

  12. A drill-soil system modelization for future Mars exploration

    Science.gov (United States)

    Finzi, A. E.; Lavagna, M.; Rocchitelli, G.

    2004-01-01

    This paper presents a first approach to the problem of modeling a drilling process to be carried on in the space environment by a dedicated payload. Systems devoted to work in space present very strict requirements in many different fields such as thermal response, electric power demand, reliability and so on. Thus, models devoted to the operational behaviour simulation represent a fundamental help in the design phase and give a great improvement in the final product quality. As the required power is the crucial constraint within drilling devices, the tool-soil interaction modelization and simulation are finalized to the computation of the power demand as a function of both the drill and the soil parameters. An accurate study of the tool and the soil separately has been firstly carried on and, secondly their interaction has been analyzed. The Dee-Dri system, designed by Tecnospazio and to be part of the lander components in the NASA's Mars Sample Return Mission, has been taken as the tool reference. The Deep-Drill system is a complex rotary tool devoted to the soil perforation and sample collection; it has to operate in a Martian zone made of rocks similar to the terrestrial basalt, then the modelization is restricted to the interaction analysis between the tool and materials belonging to the rock set. The tool geometric modelization has been faced by a finite element approach with a Langrangian formulation: for the static analysis a refined model is assumed considering both the actual geometry of the head and the rod screws; a simplified model has been used to deal with the dynamic analysis. The soil representation is based on the Mohr-Coulomb crack criterion and an Eulerian approach has been selected to model it. However, software limitations in dealing with the tool-soil interface definition required assuming a Langrangian formulation for the soil too. The interaction between the soil and the tool has been modeled by extending the two-dimensional Nishimatsu

  13. 1D models for condensation induced water hammer in pipelines

    International Nuclear Information System (INIS)

    Bloemeling, Frank; Neuhas, Thorsten; Schaffrath, Andreas

    2013-01-01

    Condensation induced water hammer (CIWH) are caused by contact of steam and subcooled water. Thus, modeling the direct contact condensation is a crucial step towards the simulation of condensation induced water hammer with 1D pressure surge codes. Therefore, also the TUeV NORD SysTec GmbH and Co. KG inhouse pressure surge code DYVRO has been equipped with a new contact condensation model. The validation of DYVRO against an experiment dealing with CIWH is presented in this contribution. (orig.)

  14. 1D models for condensation induced water hammer in pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Bloemeling, Frank; Neuhas, Thorsten; Schaffrath, Andreas [TUEV NORD SysTec GmbH und Co. KG, Hamburg (Germany)

    2013-03-15

    Condensation induced water hammer (CIWH) are caused by contact of steam and subcooled water. Thus, modeling the direct contact condensation is a crucial step towards the simulation of condensation induced water hammer with 1D pressure surge codes. Therefore, also the TUeV NORD SysTec GmbH and Co. KG inhouse pressure surge code DYVRO has been equipped with a new contact condensation model. The validation of DYVRO against an experiment dealing with CIWH is presented in this contribution. (orig.)

  15. On the Wave Stresses in the Rods of Anvil Hammers

    Directory of Open Access Journals (Sweden)

    V. M. Sinitskiy

    2014-01-01

    Full Text Available With operating anvil hammers, there are rigid impacts of die tools, and as a result, almost instantaneous impact stops of the falling parts of hammer. Such operating conditions lead to the accelerated breakdowns of rods because of significant wave stresses arising in them. Common differential and integral methods to estimate wave stresses are widespread in engineering practice. However, to use them a researcher has to possess certain skills and special software. We consider the method for estimating the wave stresses in the rods of anvil hammers based on Laplace transforms (LT of wave equation. The article shows a procedure to set up and solve differential wave equations by operator method. These equations describe the wave propagation process of strains and stresses in the rods of anvil hammers with rigid impact and taking into account a damping rod connection with the head of hammer. The method takes into consideration an influence of both piston and rod weights and of mechanical and geometrical characteristics of rod on the stress value in the placement of rod in hammer head. Results analysis shows that a sufficiently efficient method for practical improving the durability of rods is the method of damping impact load on the rod through setting the damping devices in the form either of elastic "pad" of one or another design or of hydraulic shock absorbers in the placement of its connection with the hammer head. In this case there is a change of the wave front, it becomes flatter. It is shown that the stresses in the rod are proportional to the amount of wave stresses because of the own impact of rod and piston, which make a total weight of the system. Effect of piston weight on the stresses value at the rod during impact is directly proportional to the ratio of its weight to the rod weight. The geometric parameters of rod and the speed of the falling parts before the impact also influence on the value of stresses in the rod.The represented

  16. Water-hammer in the cold leg during an SBLOCA due to cold ECCS injection

    International Nuclear Information System (INIS)

    Ortiz, M.G.; Ghan, L.S.

    1991-01-01

    Water-hammer might occur in the cold leg of pressurized water reactors (PWR) during small break loss-of-coolant accidents (SBLOCA's), when cold emergency core cooling system (ECCS) water is injected into a pipe that may be partially filled with saturated steam. The water may mix with the steam and cause it to condense abruptly. Depending on the flow regime present, slugs of liquid may then be accelerated towards each other or against the piping structure. The possibility of this phenomenon is of concern to us because it may become a dominant phenomenon and change the character of the transient. In performing the code scaling, applicability, and uncertainty study (CSAU) on a SBLOCA scenario, we had to examine the possibility that the transient being analyzed could experience water-hammer and thus depart from the scope of the study. Two criteria for water-hammer initiation were investigated and tested using a RELAP5/MOD3 simulation of the transient. Our results indicated a very low likelihood of occurrence of the phenomenon. 8 refs., 6 figs

  17. Brine and Gas Flow Patterns Between Excavated Areas and Disturbed Rock Zone in the 1996 Performance Assessment for the Waste Isolation Pilot Plant for a Single Drilling Intrusion that Penetrates Repository and Castile Brine Reservoir

    International Nuclear Information System (INIS)

    Economy, Kathleen M.; Helton, Jon Craig; Vaughn, Palmer

    1999-01-01

    The Waste Isolation Pilot Plant (WIPP), which is located in southeastern New Mexico, is being developed for the geologic disposal of transuranic (TRU) waste by the U.S. Department of Energy (DOE). Waste disposal will take place in panels excavated in a bedded salt formation approximately 2000 ft (610 m) below the land surface. The BRAGFLO computer program which solves a system of nonlinear partial differential equations for two-phase flow, was used to investigate brine and gas flow patterns in the vicinity of the repository for the 1996 WIPP performance assessment (PA). The present study examines the implications of modeling assumptions used in conjunction with BRAGFLO in the 1996 WIPP PA that affect brine and gas flow patterns involving two waste regions in the repository (i.e., a single waste panel and the remaining nine waste panels), a disturbed rock zone (DRZ) that lies just above and below these two regions, and a borehole that penetrates the single waste panel and a brine pocket below this panel. The two waste regions are separated by a panel closure. The following insights were obtained from this study. First, the impediment to flow between the two waste regions provided by the panel closure model is reduced due to the permeable and areally extensive nature of the DRZ adopted in the 1996 WIPP PA, which results in the DRZ becoming an effective pathway for gas and brine movement around the panel closures and thus between the two waste regions. Brine and gas flow between the two waste regions via the DRZ causes pressures between the two to equilibrate rapidly, with the result that processes in the intruded waste panel are not isolated from the rest of the repository. Second, the connection between intruded and unintruded waste panels provided by the DRZ increases the time required for repository pressures to equilibrate with the overlying and/or underlying units subsequent to a drilling intrusion. Third, the large and areally extensive DRZ void volumes is a

  18. Brine and Gas Flow Patterns Between Excavated Areas and Disturbed Rock Zone in the 1996 Performance Assessment for the Waste Isolation Pilot Plant for a Single Drilling Intrusion that Penetrates Repository and Castile Brine Reservoir

    Energy Technology Data Exchange (ETDEWEB)

    ECONOMY,KATHLEEN M.; HELTON,JON CRAIG; VAUGHN,PALMER

    1999-10-01

    The Waste Isolation Pilot Plant (WIPP), which is located in southeastern New Mexico, is being developed for the geologic disposal of transuranic (TRU) waste by the U.S. Department of Energy (DOE). Waste disposal will take place in panels excavated in a bedded salt formation approximately 2000 ft (610 m) below the land surface. The BRAGFLO computer program which solves a system of nonlinear partial differential equations for two-phase flow, was used to investigate brine and gas flow patterns in the vicinity of the repository for the 1996 WIPP performance assessment (PA). The present study examines the implications of modeling assumptions used in conjunction with BRAGFLO in the 1996 WIPP PA that affect brine and gas flow patterns involving two waste regions in the repository (i.e., a single waste panel and the remaining nine waste panels), a disturbed rock zone (DRZ) that lies just above and below these two regions, and a borehole that penetrates the single waste panel and a brine pocket below this panel. The two waste regions are separated by a panel closure. The following insights were obtained from this study. First, the impediment to flow between the two waste regions provided by the panel closure model is reduced due to the permeable and areally extensive nature of the DRZ adopted in the 1996 WIPP PA, which results in the DRZ becoming an effective pathway for gas and brine movement around the panel closures and thus between the two waste regions. Brine and gas flow between the two waste regions via the DRZ causes pressures between the two to equilibrate rapidly, with the result that processes in the intruded waste panel are not isolated from the rest of the repository. Second, the connection between intruded and unintruded waste panels provided by the DRZ increases the time required for repository pressures to equilibrate with the overlying and/or underlying units subsequent to a drilling intrusion. Third, the large and areally extensive DRZ void volumes is a

  19. The Preparation and Performances of Self-Dispersed Nanomicron Emulsified Wax Solid Lubricant Ewax for Drilling Fluids

    Directory of Open Access Journals (Sweden)

    Feng-shan Zhou

    2014-01-01

    Full Text Available An oil-in-water nanomicron wax emulsion with oil phase content 45 wt% was prepared by using the emulsifying method of surfactant-in-oil. The optimum prepared condition is 85°C, 20 min, and 5 wt% complex emulsifiers. Then the abovementioned nanomicron emulsifying wax was immersed into a special water-soluble polymer in a certain percentage by the semidry technology. At last, a solidified self-dispersed nanomicron emulsified wax named as Ewax, a kind of solid lubricant for water based drilling fluid, was obtained after dried in the special soluble polymer containing emulsifying wax in low temperature. It is shown that the adhesion coefficient reduced rate (ΔKf is 73.5% and the extreme pressure (E-P friction coefficient reduced rate (Δf is 77.6% when the produced Ewax sample was added to fresh water based drilling fluid at dosage 1.0 wt%. In comparison with other normal similar liquid products, Ewax not only has better performances of lubrication, filtration loss control property, heat resistance, and tolerance to salt and is environmentally friendly, but also can solve the problems of freezing in the winter and poor storage stability of liquid wax emulsion in oilfield applications.

  20. Investigations on the performance of ultrasonic drilling process with special reference to precision machining of advanced ceramics

    International Nuclear Information System (INIS)

    Adithan, M.; Laroiya, S.C.

    1997-01-01

    Advanced ceramics are assuming an important role in modern industrial technology. The applications and advantages of using advanced ceramics are many. There are several reasons why we should go in for machining of advanced ceramics after their compacting and sintering. These are discussed in this paper. However, precision machining of advanced ceramics must be economical. Critical technological issues to be addressed in cost effective machining of ceramics include design of machine tools, tooling arrangements, improved yield and precision, relationship of part dimensions and finish specifications to functional performance, and on-line inspection. Considering the above ultrasonic drilling is an important process used for the precision machining of advanced ceramics. Extensive studies on tool wear occurring in the ultrasonic machining of advanced ceramics have been carried out. In addition, production accuracy of holes drilled, surface finish obtained and surface integrity aspects in the machining of advanced ceramics have also been investigated. Some specific findings with reference to surface integrity are: a) there were no cracks or micro-cracks developed during or after ultrasonic machining of advanced ceramics, b) while machining Hexoloy alpha silicon carbide a recast layer is formed as a result of ultrasonic machining. This is attributed to the viscous heating resulting from high energy impacts during ultrasonic machining. While machining all other types of ceramics no such formation of recast layer was observed, and , c) there is no change in the microstructure of the advanced ceramics as a result of ultrasonic machining

  1. Improved ATLAS HammerCloud Monitoring for local Site Administration

    CERN Document Server

    Boehler, Michael; The ATLAS collaboration; Hoenig, Friedrich; Legger, Federica; Sciacca, Francesco Giovanni; Mancinelli, Valentina

    2015-01-01

    Every day hundreds of tests are run on the Worldwide LHC Computing Grid for the ATLAS, and CMS experiments in order to evaluate the performance and reliability of the different computing sites. All this activity is steered, controlled, and monitored by the HammerCloud testing infrastructure. Sites with failing functionality tests are auto-excluded from the ATLAS computing grid, therefore it is essential to provide a detailed and well organized web interface for the local site administrators such that they can easily spot and promptly solve site issues. Additional functionality has been developed to extract and visualize the most relevant information. The site administrators can now be pointed easily to major site issues which lead to site blacklisting as well as possible minor issues that are usually not conspicuous enough to warrant the blacklisting of a specific site, but can still cause undesired effects such as a non-negligible job failure rate. This paper summarizes the different developments and optimiz...

  2. Improved ATLAS HammerCloud Monitoring for local Site Administration

    CERN Document Server

    Boehler, Michael; The ATLAS collaboration; Hoenig, Friedrich; Legger, Federica

    2015-01-01

    Every day hundreds of tests are run on the Worldwide LHC Computing Grid for the ATLAS, CMS, and LHCb experiments in order to evaluate the performance and reliability of the different computing sites. All this activity is steered, controlled, and monitored by the HammerCloud testing infrastructure. Sites with failing functionality tests are auto-excluded from the ATLAS computing grid, therefore it is essential to provide a detailed and well organized web interface for the local site administrators such that they can easily spot and promptly solve site issues. Additional functionalities have been developed to extract and visualize the most relevant information. The site administrators can now be pointed easily to major site issues which lead to site blacklisting as well as possible minor issues that are usually not conspicuous enough to warrant the blacklisting of a specific site, but can still cause undesired effects such as a non-negligible job failure rate. This contribution summarizes the different developm...

  3. Transportal femoral drilling creates more horizontal ACL graft orientation compared to transtibial drilling: A 3D CT imaging study.

    Science.gov (United States)

    Clockaerts, S; Van Haver, A; Verhaegen, J; Vuylsteke, K; Leenders, T; Lagae, K C; Verdonk, P

    2016-06-01

    The principle of anatomic anterior cruciate ligament (ACL) reconstruction is to create a femoral and tibial tunnel that resembles the insertion of the native ACL. Anatomic reconstruction leads to a more horizontal graft orientation that provides more rotational stability. The aim of this study is to investigate the best method to achieve anatomical reconstruction of femoral insertion of the ACL and thus, a more horizontal orientation of the ACL. We compared tunnel position and orientation between transportal femoral drilling technique and transtibial technique. Thirty-two patients were included. Post-operative CT scans were obtained and femur, tibia and ACL tunnels were reconstructed. The position and orientation of tibial and femoral tunnels were quantified using the quadrant method, and femoral tunnel length, ellipticity and posterior wall breakage were assessed. We also investigated clinical outcome. Analyses show that transportal drilled femoral tunnels were situated significantly lower than transtibial drilled tunnels (p<0.0001), resulting in a significantly more horizontal oriented ACL in the transportal group in coronal (p<0.0001) and sagittal plane (p=0.01). No differences were observed in depth of femoral tunnel position (p=0.44). Femoral tunnel length was shorter in the transportal group (p=0.01) with a more ellipsoidal femoral aperture (p=0.01). There were no differences between both groups in tibial position. There were no differences in clinical outcome measure between the transportal and transtibial groups. This study indicates that transportal drilling of the femoral tunnel leads to a more horizontal graft orientation of the ACL, without differences in clinical outcome. Copyright © 2016 Elsevier B.V. All rights reserved.

  4. Agarwood Waste as A New Fluid Loss Control Agent in Water-based Drilling Fluid

    Directory of Open Access Journals (Sweden)

    Azlinda Azizi

    2013-10-01

    Full Text Available Normal 0 false false false IN X-NONE X-NONE MicrosoftInternetExplorer4 Agarwood has been used widely in various ways, including traditional medicine and art. The usage of agarwood has grown broader in modern times include in therapeutic medicines and perfumery. In this paper the agarwood waste has been explored to be used as a fluid loss control agent to control fluid loss without affecting the drilling fluid rheological properties which are density, pH, viscosity, yield point and gel strength. Agarwood waste was used as an additive in the drilling fluid system due to its unique characteristic. Rheological and filtration measurements were performed on the formulated water-based drilling fluid. Formulations of a base solution of fresh water, sodium hydroxide, bentonite, barite, and xanthan gum were presented. The performance of the agarwood waste as the fluid loss control agent was compared with based fluid formulation and water-based drilling fluid with treating with conventional fluid loss control agent (starch. The filtrate volume of drilling fluid with agarwood waste was about 13 ml while for drilling fluid with conventional fluid loss control agent, starch gave 12 ml of filtrate volume after undergoing filtration test by using LPLT filter press. The performance of drilling fluid with agarwood was efficient as drilling fluid with starch. /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso

  5. Analysis and Testing of Load Characteristics for Rotary-Percussive Drilling of Lunar Rock Simulant with a Lunar Regolith Coring Bit

    Directory of Open Access Journals (Sweden)

    Peng Li

    2017-01-01

    Full Text Available Based on an optimized lunar regolith coring bit (LRCB configuration, the load characteristics of rotary-percussive drilling of lunar rock simulant in a laboratory environment are analyzed to determine the effects of the drilling parameters (the rotational velocity, the penetration rate, and the percussion frequency on the drilling load. The process of rotary drilling into lunar rock using an LRCB is modeled as an interaction between an elemental blade and the rock. The rock’s fracture mechanism during different stages of the percussive mechanism is analyzed to create a load forecasting model for the cutting and percussive fracturing of rock using an elemental blade. Finally, a model of the load on the LRCB is obtained from the analytic equation for the bit’s cutting blade distribution; experimental verification of the rotary-impact load characteristics for lunar rock simulant with different parameters is performed. The results show that the penetrations per revolution (PPR are the primary parameter influencing the drilling load. When the PPR are fixed, increasing the percussion frequency reduces the drilling load on the rock. Additionally, the variation pattern of the drilling load of the bit is in agreement with that predicted by the theoretical model. This provides a research basis for subsequent optimization of the drilling procedure and online recognition of the drilling process.

  6. Real Time Seismic Prediction while Drilling

    Science.gov (United States)

    Schilling, F. R.; Bohlen, T.; Edelmann, T.; Kassel, A.; Heim, A.; Gehring, M.; Lüth, S.; Giese, R.; Jaksch, K.; Rechlin, A.; Kopf, M.; Stahlmann, J.; Gattermann, J.; Bruns, B.

    2009-12-01

    Efficient and safe drilling is a prerequisite to enhance the mobility of people and goods, to improve the traffic as well as utility infrastructure of growing megacities, and to ensure the growing energy demand while building geothermal and in hydroelectric power plants. Construction within the underground is often building within the unknown. An enhanced risk potential for people and the underground building may arise if drilling enters fracture zones, karsts, brittle rocks, mixed solid and soft rocks, caves, or anthropogenic obstacles. Knowing about the material behavior ahead of the drilling allows reducing the risk during drilling and construction operation. In drilling operations direct observations from boreholes can be complemented with geophysical investigations. In this presentation we focus on “real time” seismic prediction while drilling which is seen as a prerequisite while using geophysical methods in modern drilling operations. In solid rocks P- and S-wave velocity, refraction and reflection as well as seismic wave attenuation can be used for the interpretation of structures ahead of the drilling. An Integrated Seismic Imaging System (ISIS) for exploration ahead of a construction is used, where a pneumatic hammer or a magnetostrictive vibration source generate repetitive signals behind the tunneling machine. Tube waves are generated which travel along the tunnel to the working face. There the tube waves are converted to mainly S- but also P-Waves which interact with the formation ahead of the heading face. The reflected or refracted waves travel back to the working front are converted back to tube waves and recorded using three-component geophones which are fit into the tips of anchor rods. In near real time, the ISIS software allows for an integrated 3D imaging and interpretation of the observed data, geological and geotechnical parameters. Fracture zones, heterogeneities, and variations in the rock properties can be revealed during the drilling

  7. Drilling rig

    Energy Technology Data Exchange (ETDEWEB)

    Galiopa, A A; Yegorov, E K

    1981-01-04

    A drilling rig is proposed which contains a tower, lifter in the form of n infinite chain, and mobile rotator with holding device connected to the chain, and pipe holder. In order to accelerate the auxiliary operations to move the drilling string and unloaded rotator, the rotator is equipped with a clamp with means for transverse connection of it to both branches of the chain, while the pipe holders equipped with a clamp with means of connecting it to one of the branches of the chain.

  8. Computation of water hammer protection of modernized pumping station

    Science.gov (United States)

    Himr, Daniel

    2014-03-01

    Pumping station supplies water for irrigation. Maximal capacity 2 × 1.2m3·s-1 became insufficient, thus it was upgraded to 2 × 2m3·s-1. Paper is focused on design of protection against water hammer in case of sudden pumps trip. Numerical simulation of the most dangerous case (when pumps are giving the maximal flow rate) showed that existing air vessels were not able to protect the system and it would be necessary to add new vessels. Special care was paid to influence of their connection to the main pipeline, because the resistance of the connection has a significant impact on the scale of pressure pulsations. Finally, the pump trip was performed to verify if the system worked correctly. The test showed that pressure pulsations are lower (better) than computation predicted. This discrepancy was further analysed.

  9. Steam condensation induced water hammer simulations for different pipelines

    International Nuclear Information System (INIS)

    Barna, I.F.; Ezsol, G.

    2011-01-01

    We investigate steam condensation induced water hammer (CIWH) phenomena and present theoretical results for different kind of pipelines. We analyze the process with the WAHA3 model based on two-phase flow six first-order partial differential equations that present one dimensional, surface averaged mass, momentum and energy balances. A second order accurate high-resolution shock-capturing numerical scheme was applied with different kind of limiters in the numerical calculations. At first, we present calculations for various pipelines in the VVER-440-312 type nuclear reactor. Our recent calculation clearly shows that the six conditions of Griffith are only necessary conditions for CIWH but not sufficient. As second results we performed calculations for various geometries and compare with the theory of Chun. (author)

  10. A new approach to development drilling in Trinidad-Tesoro

    Energy Technology Data Exchange (ETDEWEB)

    Persad, K.M.

    1972-01-01

    A detailed correlation of the Upper Cruse by means of electric logs from wells in Central Palo Seco field in S. Trinidad was done in an attempt to trace sands which have yielded very high oil productions, but which shaled out completely, very rapidly, in seemingly random directions. A new approach was attempted, namely, using the S.P. shapes from the logs to identify depositional environments of the sands, with a view to determining the paleogeography of the area. This study has revealed a meander belt channel running from west to east and ending in a delta, with several distributary chanels. It has also been possible to distinguish areas of lagoonal or pro-deltaic deposition. On the basis of this study, one well P.S. 816, was drilled but found only part of the channel. Another location has been recommended, but has not yet been drilled. If this well finds the main channel, a dipmeter will be run to help in the siting of new locations.

  11. A database of archived drilling records of the drill cuttings piles at the North West Hutton oil platform

    International Nuclear Information System (INIS)

    Marsh, Roy

    2003-01-01

    Drill cuttings piles are found underneath several hundred oil platforms in the North Sea, and are contaminated with hydrocarbons and chemical products. This study characterised the environmental risk posed by the cuttings pile at the North West Hutton (NWH) oil platform. Data on the drilling fluids and chemical products used over the platform's drilling history were transferred from archived well reports into a custom database, to which were added toxicological and safety data. Although the database contained many gaps, it established that only seven chemical products used at NWH were not in the lowest category of the Offshore Chemicals Notification Scheme, and were used in only small quantities. The study therefore supports the view that the main environmental risk posed by cuttings piles comes from hydrocarbon contamination. The (dated) well records could help future core sampling to be targeted at specific locations in the cuttings piles. Data from many platforms could also be pooled to determine generic 'discharge profiles.' Future study would benefit from the existence, in the public domain, of a standardised, 'legacy' database of chemical products

  12. Drilling bits for deep drilling and process for their manufacture

    Energy Technology Data Exchange (ETDEWEB)

    Rhode, H.; Juergens, R.; Feenstra, R.; Busking, B.E.

    1978-11-30

    The invention concerns a drilling head or a drilling bit for use in deep drilling in underground formations and particularly concerns a drilling bit with a drilling bit body, which has a shank and a hollow space, which is connected with a duct extending through the shank. The drilling bit body has several separate cutting elements for removing material from the floor of a borehole and hydraulic devices for cooling and/or cleaning the cutting elements are provided.

  13. Securing a robust electrical discharge drilling process by means of flow rate control

    Science.gov (United States)

    Risto, Matthias; Munz, Markus; Haas, Ruediger; Abdolahi, Ali

    2017-10-01

    This paper deals with the increase of the process robustness while drilling cemented carbide using electrical discharge machining (EDM). A demand for high efficiency in the resulting diameter is equivalent with a high robustness of the EDM drilling process. Analysis were done to investigate the process robustness (standard deviation of the borehole diameter) when drilling cemented carbide. The investigation has shown that the dielectric flow rate changes over the drilling process. In this case the flow rate decreased with a shorter tool electrode due to an uneven wear of the tool electrode's cross section. Using a controlled flow rate during the drilling process has led to a reduced standard deviation of the borehole diameter, thus to a higher process robustness when drilling cemented carbide.

  14. Robotic Planetary Drill Tests

    Science.gov (United States)

    Glass, Brian J.; Thompson, S.; Paulsen, G.

    2010-01-01

    Several proposed or planned planetary science missions to Mars and other Solar System bodies over the next decade require subsurface access by drilling. This paper discusses the problems of remote robotic drilling, an automation and control architecture based loosely on observed human behaviors in drilling on Earth, and an overview of robotic drilling field test results using this architecture since 2005. Both rotary-drag and rotary-percussive drills are targeted. A hybrid diagnostic approach incorporates heuristics, model-based reasoning and vibration monitoring with neural nets. Ongoing work leads to flight-ready drilling software.

  15. Technique for estimating the sound power level radiated by pneumatic rock drills and the evaluation of a CSIR prototype rock drill with engineering noise controls

    CSIR Research Space (South Africa)

    Kovalchik, PG

    2009-05-01

    Full Text Available and the radiation patterns in octave and 1/3 octave bands. Overall sound power level is also determined. This paper also reports the results obtained by using this procedure to evaluate a SECO S215 standard production drill and a CSIR Miningtek prototype rock drill...

  16. A Lift-Off-Tolerant Magnetic Flux Leakage Testing Method for Drill Pipes at Wellhead.

    Science.gov (United States)

    Wu, Jianbo; Fang, Hui; Li, Long; Wang, Jie; Huang, Xiaoming; Kang, Yihua; Sun, Yanhua; Tang, Chaoqing

    2017-01-21

    To meet the great needs for MFL (magnetic flux leakage) inspection of drill pipes at wellheads, a lift-off-tolerant MFL testing method is proposed and investigated in this paper. Firstly, a Helmholtz coil magnetization method and the whole MFL testing scheme are proposed. Then, based on the magnetic field focusing effect of ferrite cores, a lift-off-tolerant MFL sensor is developed and tested. It shows high sensitivity at a lift-off distance of 5.0 mm. Further, the follow-up high repeatability MFL probing system is designed and manufactured, which was embedded with the developed sensors. It can track the swing movement of drill pipes and allow the pipe ends to pass smoothly. Finally, the developed system is employed in a drilling field for drill pipe inspection. Test results show that the proposed method can fulfill the requirements for drill pipe inspection at wellheads, which is of great importance in drill pipe safety.

  17. A Lift-Off-Tolerant Magnetic Flux Leakage Testing Method for Drill Pipes at Wellhead

    Directory of Open Access Journals (Sweden)

    Jianbo Wu

    2017-01-01

    Full Text Available To meet the great needs for MFL (magnetic flux leakage inspection of drill pipes at wellheads, a lift-off-tolerant MFL testing method is proposed and investigated in this paper. Firstly, a Helmholtz coil magnetization method and the whole MFL testing scheme are proposed. Then, based on the magnetic field focusing effect of ferrite cores, a lift-off-tolerant MFL sensor is developed and tested. It shows high sensitivity at a lift-off distance of 5.0 mm. Further, the follow-up high repeatability MFL probing system is designed and manufactured, which was embedded with the developed sensors. It can track the swing movement of drill pipes and allow the pipe ends to pass smoothly. Finally, the developed system is employed in a drilling field for drill pipe inspection. Test results show that the proposed method can fulfill the requirements for drill pipe inspection at wellheads, which is of great importance in drill pipe safety.

  18. Safety and efficacy of cervical laminoplasty using a piezosurgery device compared with a high-speed drill.

    Science.gov (United States)

    Li, Kunpeng; Zhang, Wen; Li, Bin; Xu, Hui; Li, Zhong; Luo, Dawei; Zhang, Jingtao; Ma, Jinzhu

    2016-09-01

    Piezosurgery is a relatively new osteotomy technique using microvibrations of scalpels at ultrasonic frequencies to perform safe and effective osteotomies without damage to adjacent soft tissue, which is widely used in spinal, oral, and maxillofacial surgery. We hypothesized that such a device could also be useful in cervical laminoplasty. The purpose of this study was to compare the safety and efficacy of a piezosurgery device with those of a highspeed drill in cervical laminoplasty. A prospectively randomized clinical study was designed. Forty-two consecutive patients were enrolled in the study. All patients underwent modified expansive open-door laminoplasty and were randomly divided into 2 groups according to the instrument for transection of the lamina, using high-speed drill (drill group) or piezosurgery device (piezosurgery group). The operation time, intraoperative blood loss, and postoperative drainage were recorded. Japanese Orthopedic Association (JOA) score and visual analogue scale (VAS) as clinical assessments were quantified. No significant difference was observed in the operation time between the 2 groups. In the piezosurgery group, there were less loss of the intraoperative blood and postoperative drainage compared with the drill group. However, clinical results (VAS and JOA scores) showed no significant difference between both groups during the all follow-up periods. The piezosurgery is a useful instrument and at least as safe and efficacious as the conventional high-speed drill in cervical laminoplasty.

  19. Lower crustal section of the Oman Ophiolite drilled in Hole GT1A, ICDP Oman Drilling Project

    Science.gov (United States)

    Umino, S.; Kelemen, P. B.; Matter, J. M.; Coggon, J. A.; Takazawa, E.; Michibayashi, K.; Teagle, D. A. H.

    2017-12-01

    Hole GT1A (22° 53.535'N, 58° 30.904'E) was drilled by the Oman Drilling Project (OmDP) into GT1A of the Samail ophiolite, Oman. OmDP is an international collaboration supported by the International Continental Scientific Drilling Program, the Deep Carbon Observatory, NSF, IODP, JAMSTEC, and the European, Japanese, German and Swiss Science Foundations, with in-kind support in Oman from the Ministry of Regional Municipalities and Water Resources, Public Authority of Mining, Sultan Qaboos University, and the German University of Technology. Hole GT1A was diamond cored in 22 Jan to 08 Feb 2017 to a total depth of 403.05 m. The outer surfaces of the cores were imaged and described on site before being curated, boxed and shipped to the IODP drill ship Chikyu, where they underwent comprehensive visual and instrumental analysis. Hole GT1A drilled the lower crustal section in the southern Oman Ophiolite and recovered 401.52 m of total cores (99.6% recovery). The main lithology is dominated by olivine gabbro (65.9%), followed in abundance by olivine-bearing gabbro (21.5%) and olivine melagabbro (3.9%). Minor rock types are orthopyroxene-bearing olivine gabbro (2.4%), oxide-bearing olivine gabbro (1.5%), gabbro (1.1%), anorthositic gabbro (1%), troctolitic gabbro (0.8%); orthopyroxene-bearing gabbro (0.5%), gabbronorite (0.3%); and dunite (0.3%). These rocks are divided into Lithologic Unit I to VII at 26.62 m, 88.16 m, 104.72 m, 154.04 m, 215.22 m, 306.94 m in Chikyu Curated Depth in descending order; Unit I and II consist of medium-grained olivine gabbro with lower olivine abundance in Unit II. Unit III is medium-grained olivine melagabbros, marked by an increase in olivine. Unit IV is relatively homogenous medium-grained olivine gabbros with granular textures. Unit V is identified by the appearance of fine-grained gabbros, but the major rocktypes are medium grained olivine gabbros. Unit VI is medium-grained olivine gabbro, marked by appearance of orthopyroxene. Unit VII

  20. Planning, drilling and completing a record horizontal well in the Gulf of Mexico

    International Nuclear Information System (INIS)

    Johnston, R.A.; Porter, D.A.; Hill, P.L.; Smolen, B.C.

    1993-01-01

    Maximizing profits is the ultimate business objective in all drilling and completion operations. By far and away the biggest contributor to profits is the productivity of the well. Reliability and costs certainly impact profits; however, they pale in comparison to productivity when a rigorous calculation of net present value is performed. The simplest and most effective way to improve productivity is to increase the quantity of net reservoir exposed to the wellbore. A horizontal trajectory is the ultimate way to maximize the length of formation exposed to the wellbore. Drilling completion technology development over the last several years has made the use of horizontal wellbores in unconsolidated formations practical. Utilizing a unique mixture of new and existing technology, BP recently brought their first horizontal well in the Gulf of Mexico on line in record setting fashion. The planning, installation and results of this team effort are detailed in this operations oriented paper

  1. Simulation of low pressure water hammer

    Science.gov (United States)

    Himr, D.; Habán, V.

    2010-08-01

    Numerical solution of water hammer is presented in this paper. The contribution is focused on water hammer in the area of low pressure, which is completely different than high pressure case. Little volume of air and influence of the pipe are assumed in water, which cause sound speed change due to pressure alterations. Computation is compared with experimental measurement.

  2. Benchmarks solutions of the coupled systems NJOY/AMPX-II/HAMMER-TECHNION and the library JENDL-3

    International Nuclear Information System (INIS)

    Santos, A. dos

    1991-01-01

    Benchmarks calculations were performed with the newest released japanese nuclear data library JENDL-3. The calculations were performed with the methodology developed at IPEN/CNEN-SP based on a coupled NJOY/AMPX-II/HAMMER-TECHNION system. The analyses show that the long-standing problem of the overprediction of the epithermal U-238 neutron capture still remains. Besides that there is an indication that the fission cross section of U-238 might be underestimated. (author)

  3. "Push back" technique: A simple method to remove broken drill bit from the proximal femur.

    Science.gov (United States)

    Chouhan, Devendra K; Sharma, Siddhartha

    2015-11-18

    Broken drill bits can be difficult to remove from the proximal femur and may necessitate additional surgical exploration or special instrumentation. We present a simple technique to remove a broken drill bit that does not require any special instrumentation and can be accomplished through the existing incision. This technique is useful for those cases where the length of the broken drill bit is greater than the diameter of the bone.

  4. Heave disturbance attenuation in managed pressure drilling from a floating platform using model predictive control

    OpenAIRE

    Hatlevik, Edvin

    2014-01-01

    Since a large part of the Norwegian oil shelf has been active for over a generation, many fields begin to be depleted and the drilling operations requires tight down hole pressure margins. And by improving the pressure control for the drilling operations former undrillable wells becomes drillable. Which will make the the oilfields more profitable, and extend their life expectancy. It will also make drilling operations safer by preventing kicks and preventing environmental damages caused by mu...

  5. A Comprehensive Prediction Model of Hydraulic Extended-Reach Limit Considering the Allowable Range of Drilling Fluid Flow Rate in Horizontal Drilling.

    Science.gov (United States)

    Li, Xin; Gao, Deli; Chen, Xuyue

    2017-06-08

    Hydraulic extended-reach limit (HERL) model of horizontal extended-reach well (ERW) can predict the maximum measured depth (MMD) of the horizontal ERW. The HERL refers to the well's MMD when drilling fluid cannot be normally circulated by drilling pump. Previous model analyzed the following two constraint conditions, drilling pump rated pressure and rated power. However, effects of the allowable range of drilling fluid flow rate (Q min  ≤ Q ≤ Q max ) were not considered. In this study, three cases of HERL model are proposed according to the relationship between allowable range of drilling fluid flow rate and rated flow rate of drilling pump (Q r ). A horizontal ERW is analyzed to predict its HERL, especially its horizontal-section limit (L h ). Results show that when Q min  ≤ Q r  ≤ Q max (Case I), L h depends both on horizontal-section limit based on rated pump pressure (L h1 ) and horizontal-section limit based on rated pump power (L h2 ); when Q min  drilling fluid flow rate, while L h2 keeps decreasing as the drilling fluid flow rate increases. The comprehensive model provides a more accurate prediction on HERL.

  6. Possible use of a computer for processing technological information of daily reports on drilling in order to optimize the drilling regimes

    Energy Technology Data Exchange (ETDEWEB)

    Sukhanov, V B; Kovalev, A A; Rezchikov, A V; Sukhanova, L G; Vyazenkin, S N; Zakolyuzhnyy, V D

    1982-01-01

    It is suggested that a computer be used for processing technological information of data reports on drilling. This will permit solution in the future to the task of monitoring the observation of the assigned regime-technological parameters of drilling wells by compiling planning recommendations and factual information about their fulfillment. Comprehensive analysis of the factual data regarding the regimes of making wells based on the information of daily reports on drilling using a computer in the OAIS system of drilling of the Ministry of the Gas Industry at the existing stage of technical support of the associations with a computer will permit in the near future production of exhaustive regime-technological information regarding the operation of bits in each well and development of RTK for drilling future wells by intervals of the same drillability.

  7. Temperature Change When Drilling Near the Distal Femoral Physis in a Skeletally Immature Ovine Model.

    Science.gov (United States)

    Tenfelde, Allison M; Esquivel, Amanda O; Cracchiolo, Allison M; Lemos, Stephen E

    2016-01-01

    The possibility of physeal injury during anterior cruciate ligament reconstruction in the pediatric population is a concern. The purpose of this study was to determine whether drilling at or near the physis could cause a temperature increase that could trigger chondrolysis. Skeletally immature cadaveric lamb distal femurs were used for this study and randomly placed in 1 of 6 groups (n=10 in each group). We examined the 8 and 10 mm Flipcutter at a distance of 0.5 mm from the physis and an 8 and 10 mm acorn-tipped reamer at a distance of 0.5 and 3.0 mm from the physis. During drilling, temperature change at the distal femoral physis was continuously measured until the temperature decreased to the original value. An interreamer comparison yielded a significant difference when drilling 0.5 mm from the physis (P=0.001). Pair-wise Mann-Whitney post hoc tests were performed to further evaluate the differences among the groups. The 8 mm FlipCutter had a significantly higher maximum temperature (39.8±1.4°C) compared with the 10 mm FlipCutter (38.0±0.6°C, P=0.001), 8 mm acorn-tipped reamer (38.1±0.9°C, P=0.007), and 10 mm acorn-tipped reamer (37.5±0.3°C, Pdrilling technique, when a traditional acorn-tipped reamer over a guidepin is utilized, even if the drilling occurs very close to the physis. In addition, the risk of drilling with a FlipCutter is low, but may be greater than a traditional reamer. Thermal-induced necrosis is a realistic concern, due to the characteristics of the distal femoral physis, and the propensity for this physis to respond poorly to injury. Our study supports that drilling near the physis can be done safely, although smaller reamers and nontraditional designs may generate higher heat. Level I-basic science.

  8. Conventional drilling versus piezosurgery for implant site preparation: a meta-analysis.

    Science.gov (United States)

    Sendyk, Daniel Isaac; Oliveira, Natacha Kalline; Pannuti, Claudio Mendes; Naclério-Homem, Maria da Graça; Wennerberg, Ann; Zindel Deboni, Maria Cristina

    2018-03-27

    The aim of this study was to evaluate the evidence of a correlation between the stability of dental implants placed by piezosurgery, compared with implants placed by conventional drilling. An electronic search in MEDLINE, SCOPUS and the Cochrane Library was undertaken until August 2016 and was supplemented by manual searches and by unpublished studies at OpenGray. Only randomized controlled clinical trials that reported implant site preparation with piezosurgery and with conventional drilling were considered eligible for inclusion in this review. Meta-analyses were performed to evaluate the impact of piezosurgery on implant stability. Of 456 references electronically retrieved, 3 were included in the qualitative analysis and quantitative synthesis. The pooled estimates suggest that there is no significant difference between piezosurgery and conventional drilling at baseline (WMD: 2.20; 95% CI: -5.09, 9,49; p = 0.55). At 90 days, the pooled estimates revealed a statistically significant difference (WMD: 3.63; 95% CI: 0.58, 6.67, p = 0.02) favouring piezosurgery. Implant stability is slightly improved when osteotomy was performed by a piezoelectric device. More randomized controlled clinical trials are needed to verify these findings.

  9. You say you want a revolution: casing drilling targets 30 per cent well-cost saving

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.; Marsters, S.

    1999-10-01

    Casing drilling is a new method of drilling that eliminates drill strings by using standard casing to simultaneously drill and case wells. Tesco Corporation of Calgary acquired patent rights to casing drilling technology in 1995. The company now offers a conversion kit for existing drill rigs as well a new compact casing drilling rig for shallow markets. The single derrick will be rated at 1,500 meters, but initially it will be used to drill 700-800 meter gas wells in southeast Alberta. Some cost savings will be realized at these shallow depths, but the real cost saving advantages will be realized on deep holes. In the meantime, improvements are planned to the cutting structures of the under-rimming bit to increase safety and withstand higher torque loads. It will be also necessary to adapt techniques such as directional drilling and logging to the casing drilling conveyance mechanism which has been only partially successful thus far, especially in the retrieving mode. Another challenge already met, involved ensuring that casing could be run in high-compression loads without damage to connections. Despite these problems, the system attracted considerable attention with several international companies placing orders for immediate delivery. Another system, this one developed by Sperry-Sun Drilling Services and known as a 'casing while drilling' (CWD) system, is strictly a downhole assembly and is targeted for offshore use and deeper vertical holes. This system is currently being tested in two commercial operations in offshore Indonesia for Unocal Corporation. Despite numerous problems to fill casing with fluid during connections, penetration rates of 300-400 feet per hour were achieved.

  10. A Proposal for Research and Development of an Explosive Drilling Technique for Geothermal Wells

    Energy Technology Data Exchange (ETDEWEB)

    None

    1975-10-01

    In order to make large scale use of the geothermal energy available it will be necessary to drill many thousands of holes deep into the earth. The objective of the proposed research is to greatly decrease drilling time and cost. Studies made of a new explosive drilling technique indicate that savings in time of from 70 to 80 percent. The research plan is to utilize explosive in the form of multiple-faced shaped charge capsules. [DJE-2005

  11. Water Hammer Test

    Science.gov (United States)

    2008-01-01

    [figure removed for brevity, see original site] Click on the image for the animation This video shows the propulsion system on an engineering model of NASA's Phoenix Mars Lander being successfully tested. Instead of fuel, water is run through the propulsion system to make sure that the spacecraft holds up to vibrations caused by pressure oscillations. The test was performed very early in the development of the mission, in 2005, at Lockheed Martin Space Systems, Denver. Early testing was possible because Phoenix's main structure was already in place from the 2001 Mars Surveyor program. The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver.

  12. Water hammer (with FSI): exact solution : parallelization and application

    NARCIS (Netherlands)

    Loh, K.; Tijsseling, A.S.

    2014-01-01

    The 1D fully coupled Fluid-Structure Interaction (FSI) model can adequately describe the water hammer effect on the fluid, and the structural behaviour of the pipe. This paper attempts to increase the capability of using an exact solution of the 1D FSI problem applied to a straight pipe with a

  13. High Temperature 300°C Directional Drilling System

    Energy Technology Data Exchange (ETDEWEB)

    Chatterjee, Kamalesh [Baker Hughes Oilfield Operations, Houston, TX (United States); Aaron, Dick [Baker Hughes Oilfield Operations, Houston, TX (United States); Macpherson, John [Baker Hughes Oilfield Operations, Houston, TX (United States)

    2015-07-31

    Many countries around the world, including the USA, have untapped geothermal energy potential. Enhanced Geothermal Systems (EGS) technology is needed to economically utilize this resource. Temperatures in some EGS reservoirs can exceed 300°C. To effectively utilize EGS resources, an array of injector and production wells must be accurately placed in the formation fracture network. This requires a high temperature directional drilling system. Most commercial services for directional drilling systems are rated for 175°C while geothermal wells require operation at much higher temperatures. Two U.S. Department of Energy (DOE) Geothermal Technologies Program (GTP) projects have been initiated to develop a 300°C capable directional drilling system, the first developing a drill bit, directional motor, and drilling fluid, and the second adding navigation and telemetry systems. This report is for the first project, “High Temperature 300°C Directional Drilling System, including drill bit, directional motor and drilling fluid, for enhanced geothermal systems,” award number DE-EE0002782. The drilling system consists of a drill bit, a directional motor, and drilling fluid. The DOE deliverables are three prototype drilling systems. We have developed three drilling motors; we have developed four roller-cone and five Kymera® bits; and finally, we have developed a 300°C stable drilling fluid, along with a lubricant additive for the metal-to-metal motor. Metal-to-metal directional motors require coatings to the rotor and stator for wear and corrosion resistance, and this coating research has been a significant part of the project. The drill bits performed well in the drill bit simulator test, and the complete drilling system has been tested drilling granite at Baker Hughes’ Experimental Test Facility in Oklahoma. The metal-to-metal motor was additionally subjected to a flow loop test in Baker Hughes’ Celle Technology Center in Germany, where it ran for more than 100

  14. New design of a compact aero-robotic drilling end effector: An experimental analysis

    Directory of Open Access Journals (Sweden)

    Shi Zhenyun

    2016-08-01

    Full Text Available This paper presents the development of a normal adjustment cell (NAC in aero-robotic drilling to improve the quality of vertical drilling, by using an intelligent double-eccentric disk normal adjustment mechanism (2-EDNA, a spherical plain bearing and a floating compress module with sensors. After the surface normal vector is calculated based on the laser sensors’ feedback, the 2-EDNA concept is conceived specifically to address the deviation of the spindle from the surface normal at the drilling point. Following the angle calculation, depending on the actual initial position, two precise eccentric disks (PEDs with an identical eccentric radius are used to rotate with the appropriate angles using two high-resolution DC servomotors. The two PEDs will carry the spindle to coincide with the surface normal, keeping the vertex of the drill bit still to avoid repeated adjustment and position compensation. A series of experiments was conducted on an aeronautical drilling robot platform with a precise NAC. The effect of normal adjustment on bore diameter, drilling force, burr size, drilling heat, and tool wear was analyzed. The results validate that using the NAC in robotic drilling results in greatly improved vertical drilling quality and is attainable in terms of intelligence and accuracy.

  15. Do chimpanzees use weight to select hammer tools?

    Directory of Open Access Journals (Sweden)

    Cornelia Schrauf

    Full Text Available The extent to which tool-using animals take into account relevant task parameters is poorly understood. Nut cracking is one of the most complex forms of tool use, the choice of an adequate hammer being a critical aspect in success. Several properties make a hammer suitable for nut cracking, with weight being a key factor in determining the impact of a strike; in general, the greater the weight the fewer strikes required. This study experimentally investigated whether chimpanzees are able to encode the relevance of weight as a property of hammers to crack open nuts. By presenting chimpanzees with three hammers that differed solely in weight, we assessed their ability to relate the weight of the different tools with their effectiveness and thus select the most effective one(s. Our results show that chimpanzees use weight alone in selecting tools to crack open nuts and that experience clearly affects the subjects' attentiveness to the tool properties that are relevant for the task at hand. Chimpanzees can encode the requirements that a nut-cracking tool should meet (in terms of weight to be effective.

  16. Testing the process of drilling - analysis of drilling performance in variegated sandstone and Keuper in Northern Germany; Der Bohrprozess auf dem Pruefstand - Analyse der Bohrleistungen im Buntsandstein und Keuper in Norddeutschland

    Energy Technology Data Exchange (ETDEWEB)

    Pust, G.; Tschaffler, H. [Mobil Erdgas Erdoel GmbH, Celle (Germany); Grunwald, R. [BEB Erdgas und Erdoel GmbH, Nienhagen (Germany); Gloth, H. [TU Bergakademie Freiberg (Germany); Marx, C. [ITE, Clausthal-Zellerfeld (Germany)

    1998-12-31

    The aim of the project launched jointly by DGMK and 5 companies from the German oil- and gas industry and two institutes for drilling technologies was to find suitable ways in which the drilling progress in formations with bad drilling conditions in Northern Germany, i.e. lower and middle variegated sandstone and Keuper can be increases in order to bring costs down. The borehole sunk in Northern Germany were surveyed and inventorised. Data were subjected to a thorough statistical analysis in order to obtain optimal drilling parameters and improve the drilling tools. Basic studies on rock damaging were also to be included in order to better understand the processes. Finally, the project aims at realising the optimal drilling parameters, increase drilling progress, use improved drilling machinery and thus cut costs. (orig.) [Deutsch] Ziel des DGMK-Gemeinschaftsprojektes mit 5 Firmen der deutschen Erdoel- und Erdgasindustrie sowie 2 bohrtechnischen Instituten war es, durch geeignete Massnahmen den Bohrfortschritt in schlechtbohrbaren Formationen in Norddeutschland, naemlich unterer und mittlerer Buntsandstein sowie Keuper, zu erhoehen und damit einen Beitrag zur Kostensenkung zu leisten. Um dieses Ziel zu erreichen, sollte eine Bestandsaufnahme der in Norddeutschland abgeteuften Bohrungen erfolgen. Die Daten sollten einer eingehenden statistischen Auswertung unterzogen werden. Hieraus sollten optimale Bohrparameter und Verbesserungen der Bohrwerkzeuge abgeleitet werden. Ferner sollten grundlegende Untersuchungen zur Gesteinszerstoerung herangezogen werden, um ein besseres Verstaendnis fuer die ablaufenden Prozesse zu bekommen. Durch die Realisierung optimaler Bohrparameter und den Einsatz verbesserter Bohrwerkszeuge sollte schliesslich die Erhoehung des Bohrfortschritts und damit eine Senkung der Kosten erreicht werden. (orig.)

  17. Uncertainty of Water-hammer Loads for Safety Related Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Seung Chan; Yoon, Duk Joo [Korea Hydro and Nuclear Power Co., LT., Daejeon (Korea, Republic of)

    2013-10-15

    In this study, the basic methodology is base on ISO GUM (Guide to the Expression of Uncertainty in Measurements). For a given gas void volumes in the discharge piping, the maximum pressure of water hammer is defined in equation. From equation, uncertainty parameter is selected as U{sub s} (superficial velocity for the specific pipe size and corresponding area) of equation. The main uncertainty parameter (U{sub s}) is estimated by measurement method and Monte Carlo simulation. Two methods are in good agreement with the extended uncertainty. Extended uncertainty of the measurement and Monte Carlo simulation is 1.30 and 1.34 respectively in 95% confidence interval. In 99% confidence interval, the uncertainties are 1.95 and 1.97 respectively. NRC Generic Letter 2008-01 requires nuclear power plant operators to evaluate the possibility of noncondensable gas accumulation for the Emergency Core Cooling System. Specially, gas accumulation can result in system pressure transient in pump discharge piping at a pump start. Consequently, this evolves into a gas water, a water-hammer event and the force imbalances on the piping segments. In this paper, MCS (Monte Carlo Simulation) method is introduced in estimating the uncertainty of water hammer. The aim is to evaluate the uncertainty of the water hammer estimation results carried out by KHNP CRI in 2013.

  18. Drilling of Copper Using a Dual-Pulse Femtosecond Laser

    Directory of Open Access Journals (Sweden)

    Chung-Wei Cheng

    2016-02-01

    Full Text Available The drilling of copper using a dual-pulse femtosecond laser with wavelength of 800 nm, pulse duration of 120 fs and a variable pulse separation time (0.1–150 ps is investigated theoretically. A one-dimensional two-temperature model with temperature-dependent material properties is considered, including dynamic optical properties and the thermal-physical properties. Rapid phase change and phase explosion models are incorporated to simulate the material ablation process. Numerical results show that under the same total laser fluence of 4 J/cm2, a dual-pulse femtosecond laser with a pulse separation time of 30–150 ps can increase the ablation depth, compared to the single pulse. The optimum pulse separation time is 85 ps. It is also demonstrated that a dual pulse with a suitable pulse separation time for different laser fluences can enhance the ablation rate by about 1.6 times.

  19. Factors analysis of water hammer in FLOWMASTER for main feedwater systems of PWR nuclear power plants

    International Nuclear Information System (INIS)

    Wang Xin; Han Weishi

    2010-01-01

    The main feedwater system of a nuclear power plant (NPP) is an important part in ensuring the cooling of a steam generator. It is the main pipe section where water hammers frequently occur. Studying the regulator patterns of water hammers in the main feedwater systems is significant to the stable operation of the system. This article focuses on a parametric study to avoid the consequences of water hammer effect in PWR by employing a general purpose fluid dynamic simulation software-FLOWMASTER. Through FLOWMASTER's transient calculating functions, a mathematical model is established with boundary conditions such as feedwater pumps, control valves, etc., calculations of water hammer pressure when feedwater pumps and control valves shut down, and simulations during instantaneous changes in water hammer pressure. Combining a plethora of engineering practical examples, this research verified the viability of calculating water hammer pressure through FLOWMASTER's transient functions and we found out that, increasing the periods of closure of control valves and feedwater pumps control water hammers effectively. We also found out that changing the intervals of closing signals to feedwater pumps and control valves aid to relieve hydraulic impact. This could be a guideline for practical engineering design and system optimization. (author)

  20. A drill-hole geodatabase as a tool to investigate geological hazard in Napoli Urban Area

    Science.gov (United States)

    Albericoa, I.; Lirer, L.; Petrosino, P.

    2003-04-01

    Geological investigations in urban areas are complicated by the absence of good outcrops and field exposures, as a result of the density of civil buildings and railway and road network. On the other side, in urban areas geological investigation represents a basic tool to decisional support for the management of present private buildings and public works and for the planning of new ones. This is much more true in urban areas very exposed to geological hazard (volcanic, hydrogeological, seismic) where the high exposed value greatly rises the risk. The methodology to deal with the geological hazard in urban areas here presented is the reconstruction of buried geological formations deduced by drill-holes stratigraphy.The test area is represented by the whole municipality of Napoli city, that proves very apt to the investigation of the hazard in urban areas since it stands over an active volcanic area, comprised between the Campi Flegrei volcanic field and the Somma-Vesuvio district, that both gave explosive and effusive activity through the last centuries. Besides, the extension of the main part of the city constrained between the coastline and the belt of volcanic hills together with the presence of loose material due to pyroclastic activity makes the alluvional events an other hazardous phenomenon for the city. The performed up datable drill-holes geodata-base for the city of Napoli at present contains the record of about 800 holes stratigraphy, collected through the main public and private bodies, reflecting the drill-holes surveys made along the last 50 years before constructing the main railways, roads and aqueduct network. Drill-holes data have been interpreted and can now be read under various viewpoints (geological, lithological, volcanological); the present work presents the first results of the geological hazard investigation. The investigation of buried stratigraphy in the eastern area allows to identify the presence of pyroclastic flow deposits from Somma

  1. The NCAA's New Hammer

    Science.gov (United States)

    Wolverton, Brad

    2012-01-01

    A series of unprecedented scandals has eroded confidence in big-time sports, increasing the appetite for change. Some critics have a tough time seeing the NCAA as a savior; they say the real problem is the NCAA structure itself, which allows athletes to generate billions of dollars for colleges while earning no compensation themselves. Mark A.…

  2. Drilling technologies in hydrogeological survey

    OpenAIRE

    Vorlíček, Petr

    2014-01-01

    This work deals with the drilling technologies used in hydrogeology. The main aim of the work is to explore types of drilling technologies used at hydrogeological drilling wells and modern technologies that could potentially be used in the future. The work also summarizes a historical development of drilling techniques, a drilling process procedure, information obtained from boreholes and the most common types of drilling fluids.

  3. The Hans Tausen drill

    DEFF Research Database (Denmark)

    Johnsen, Sigfus Johann; Dahl-Jensen, Dorthe; Steffensen, Jørgen Peder

    2007-01-01

    In the mid-1990s, excellent results from the GRIP and GISP2 deep drilling projects in Greenland opened up funding for continued ice-coring efforts in Antarctica (EPICA) and Greenland (NorthGRIP). The Glaciology Group of the Niels Bohr Institute, University of Copenhagen, was assigned the task...... of providing drilling capability for these projects, as it had done for the GRIP project. The group decided to further simplify existing deep drill designs for better reliability and ease of handling. The drill design decided upon was successfully tested on Hans Tausen Ice Cap, Peary Land, Greenland, in 1995....... The 5.0 m long Hans Tausen (HT) drill was a prototype for the ~11 m long EPICA and NorthGRIP versions of the drill which were mechanically identical to the HT drill except for a much longer core barrel and chips chamber. These drills could deliver up to 4 m long ice cores after some design improvements...

  4. Well drilling summary report for well 199-N-106A

    International Nuclear Information System (INIS)

    Walker, L.D.

    1996-02-01

    Past liquid waste disposal practices within the 100-N Area have resulted in the contamination of the underlying sediments and groundwater. The release of large volumes of liquid effluent to the 1301-N and 1325-N Liquid Waste Disposal Facilities caused the transport of 90 Sr and other contaminants to the groundwater. Further discussion of 100-N Area hydrogeology is provided in Hartman and Lindsey (1993). A pump-and-treat system combined with a vertical barrier is the preferred alternative for the N Springs Expedited Response Action. This document is a compilation of the data collected during the drilling of well 199-N-106A, an extraction well for the 100-N Pump-and-Treat Project

  5. South African drilling

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    According to the president of the South African Drilling Association, the drilling industry is meeting head-on the challenges created by the worldwide recession. The paper is a synopsis of several of the papers presented at the SADA symposium and a look at several mining-related drilling projects in South Africa. These papers include grouting techniques, the use of impregnated bits in hard rock drilling, tunnel boring for mines, surveying improvement methods and the use of explosives to increase groundwater yield

  6. Sledge-Hammer Integration

    Science.gov (United States)

    Ahner, Henry

    2009-01-01

    Integration (here visualized as a pounding process) is mathematically realized by simple transformations, successively smoothing the bounding curve into a straight line and the region-to-be-integrated into an area-equivalent rectangle. The relationship to Riemann sums, and to the trapezoid and midpoint methods of numerical integration, is…

  7. Pulsed Nd:YAG laser beam drilling: A review

    Science.gov (United States)

    Gautam, Girish Dutt; Pandey, Arun Kumar

    2018-03-01

    Laser beam drilling (LBD) is one of non contact type unconventional machining process that are employed in machining of stiff and high-strength materials, high strength temperature resistance materials such as; metal alloys, ceramics, composites and superalloys. Most of these materials are difficult-to-machine by using conventional machining methods. Also, the complex and precise holes may not be obtained by using the conventional machining processes which may be obtained by using unconventional machining processes. The laser beam drilling in one of the most important unconventional machining process that may be used for the machining of these materials with satisfactorily. In this paper, the attention is focused on the experimental and theoretical investigations on the pulsed Nd:YAG laser drilling of different categories of materials such as ferrous materials, non-ferrous materials, superalloys, composites and Ceramics. Moreover, the review has been emphasized by the use of pulsed Nd:YAG laser drilling of different materials in order to enhance productivity of this process without adverse effects on the drilled holes quality characteristics. Finally, the review is concluded with the possible scope in the area of pulsed Nd:YAG laser drilling. This review work may be very useful to the subsequent researchers in order to give an insight in the area of pulsed Nd:YAG laser drilling of different materials and research gaps available in this area.

  8. Der hadronen-hammer

    CERN Multimedia

    2006-01-01

    The depthes of the cosmos and the world of the elementary particles contain the biggest enigmae of the modern physics. With a superstrong particle accelerator the physicists want to break the hardest cores. (2,5 pages)

  9. How to reach a compromise on drilling in AWNR

    International Nuclear Information System (INIS)

    Snyder, Brian

    2008-01-01

    Drilling in the Arctic National Wildlife Refuge (ANWR) has been controversial for decades and is likely to remain so. However, progress towards resolving this controversy might be possible if the congressional proposals to open ANWR include provisions that require the federal government to spend the money the federal government makes through leasing fees and taxes on conservation. The rising price of oil means that the profits to the federal government from drilling in ANWR are greater than the amount of money required to preserve all of the world's major centers of biodiversity. Moderate environmental organizations might therefore support drilling in order to avert other larger environmental problems elsewhere

  10. NMR of geophysical drill cores with a mobile Halbach scanner

    International Nuclear Information System (INIS)

    Talnishnikh, E.

    2007-01-01

    This thesis is devoted to a mobile NMR with an improved Halbach scanner. This is a lightweight tube-shaped magnet with sensitive volume larger and a homogeneity of the magnetic field higher than the previous prototype version. The improved Halbach scanner is used for analysis of water-saturated drill cores and plugs with diameters up to 60 mm. To provide the analysis, the standard 1D technique with the CPMG sequence as well as 2D correlation experiments were successfully applied and adapted to study properties of fluid-saturated sediments. Afterwards the Halbach scanner was calibrated to fast non-destructive measurements of porosity, relaxation time distributions, and estimation of permeability. These properties can be calculated directly from the NMR data using the developed methodology. Any independent measurements of these properties with other methods are not needed. One of the main results of this work is the development of a new NMR on-line core scanner for measurements of porosity in long cylindrical and semi cylindrical drill cores. Also dedicated software was written to operate the NMR on-line core scanner. The physical background of this work is the study of the diffusion influence on transverse relaxation. The diffusion effect in the presence of internal gradients in porous media was probed by 1D and 2D experiments. The transverse relaxation time distributions obtained from 1D and from 2D experiments are comparable but different in fine details. Two new methodologies were developed based on the results of this study. First is the methodology quantifying the influence of diffusion in the internal gradients of water-saturated sediments on transverse relaxation from 2D correlation experiments. The second one is the correction of the permeability estimation from the NMR data taking in account the influence of the diffusion. Furthermore, PFG NMR technique was used to study restricted diffusion in the same kind of samples. Preliminary results are reported

  11. NMR of geophysical drill cores with a mobile Halbach scanner

    Energy Technology Data Exchange (ETDEWEB)

    Talnishnikh, E.

    2007-08-21

    This thesis is devoted to a mobile NMR with an improved Halbach scanner. This is a lightweight tube-shaped magnet with sensitive volume larger and a homogeneity of the magnetic field higher than the previous prototype version. The improved Halbach scanner is used for analysis of water-saturated drill cores and plugs with diameters up to 60 mm. To provide the analysis, the standard 1D technique with the CPMG sequence as well as 2D correlation experiments were successfully applied and adapted to study properties of fluid-saturated sediments. Afterwards the Halbach scanner was calibrated to fast non-destructive measurements of porosity, relaxation time distributions, and estimation of permeability. These properties can be calculated directly from the NMR data using the developed methodology. Any independent measurements of these properties with other methods are not needed. One of the main results of this work is the development of a new NMR on-line core scanner for measurements of porosity in long cylindrical and semi cylindrical drill cores. Also dedicated software was written to operate the NMR on-line core scanner. The physical background of this work is the study of the diffusion influence on transverse relaxation. The diffusion effect in the presence of internal gradients in porous media was probed by 1D and 2D experiments. The transverse relaxation time distributions obtained from 1D and from 2D experiments are comparable but different in fine details. Two new methodologies were developed based on the results of this study. First is the methodology quantifying the influence of diffusion in the internal gradients of water-saturated sediments on transverse relaxation from 2D correlation experiments. The second one is the correction of the permeability estimation from the NMR data taking in account the influence of the diffusion. Furthermore, PFG NMR technique was used to study restricted diffusion in the same kind of samples. Preliminary results are reported

  12. Technology strategy for cost-effective drilling and intervention; Technology Target Areas; TTA4 - Cost effective drilling and intervention

    Energy Technology Data Exchange (ETDEWEB)

    2007-07-01

    The main goals of the OG21 initiative are to (1) develop new technology and knowledge to increase the value creation of Norwegian oil and gas resources and (2) enhance the export of Norwegian oil and gas technology. The OG21 Cost-effective Drilling and Intervention (CEDI) Technology Target Area (TTA) has identified some key strategic drilling and well intervention needs to help meet the goals of OG21. These key strategic drilling and well intervention needs are based on a review of present and anticipated future offshore-Norway drilling and well intervention conditions and the Norwegian drilling and well intervention industry. A gap analysis has been performed to assess the extent to which current drilling and well intervention research and development and other activities will meet the key strategic needs. Based on the identified strategic drilling and well intervention needs and the current industry res each and development and other activities, the most important technology areas for meeting the OG21 goals are: environment-friendly and low-cost exploration wells; low-cost methods for well intervention/sidetracks; faster and extended-reach drilling; deep water drilling, completion and intervention; offshore automated drilling; subsea and sub-ice drilling; drilling through basalt and tight carbonates; drilling and completion in salt formation. More specific goals for each area: reduce cost of exploration wells by 50%; reduce cost for well intervention/sidetracks by 50%; increase drilling efficiency by 40%; reduce drilling cost in deep water by 40 %; enable offshore automated drilling before 2012; enable automated drilling from seabed in 2020. Particular focus should be placed on developing new technology for low-cost exploration wells to stem the downward trends in the number of exploration wells drilled and the volume of discovered resources. The CEDI TTA has the following additional recommendations: The perceived gaps in addressing the key strategic drilling and

  13. Experimental investigation of temperature rise in bone drilling with cooling: A comparison between modes of without cooling, internal gas cooling, and external liquid cooling.

    Science.gov (United States)

    Shakouri, Ehsan; Haghighi Hassanalideh, Hossein; Gholampour, Seifollah

    2018-01-01

    Bone fracture occurs due to accident, aging, and disease. For the treatment of bone fractures, it is essential that the bones are kept fixed in the right place. In complex fractures, internal fixation or external methods are used to fix the fracture position. In order to immobilize the fracture position and connect the holder equipment to it, bone drilling is required. During the drilling of the bone, the required forces to chip formation could cause an increase in the temperature. If the resulting temperature increases to 47 °C, it causes thermal necrosis of the bone. Thermal necrosis decreases bone strength in the hole and, subsequently, due to incomplete immobilization of bone, fracture repair is not performed correctly. In this study, attempts have been made to compare local temperature increases in different processes of bone drilling. This comparison has been done between drilling without cooling, drilling with gas cooling, and liquid cooling on bovine femur. Drilling tests with gas coolant using direct injection of CO 2 and N 2 gases were carried out by internal coolant drill bit. The results showed that with the use of gas coolant, the elevation of temperature has limited to 6 °C and the thermal necrosis is prevented. Maximum temperature rise reached in drilling without cooling was 56 °C, using gas and liquid coolant, a maximum temperature elevation of 43 °C and 42 °C have been obtained, respectively. This resulted in decreased possibility of thermal necrosis of bone in drilling with gas and liquid cooling. However, the results showed that the values obtained with the drilling method with direct gas cooling are independent of the rotational speed of drill.

  14. A new NMR measuring instrument for logging while drilling; Ein neues Logging While Drilling Kernspinresonanz-Messgeraet

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, D.M.; Thern, H.F.; Kruspe, T.; Blanz, M. [Baker Hughes INTEQ GmbH, Celle (Germany); Strobel, J. [RWE Dea AG, Hamburg (Germany)

    2003-07-01

    Since 1990, commercial wireline MR measurements are carried out in boreholes. Logging while drilling is a comparatively new technique, in which a MR sensor is integrated in the drilling equipment so that the measured data are available more quickly. Problems may be caused by movement of the drilling rig. The resulting vibrations may distort the MR signal. Current development activities therefore focus on design optimization for higher vibration stability. The contribution explains vibration-induced wrong measuring signals and presents measures to reduce the effects of vibration. Further, a new LWD-MR measuring instrument is presented, the so-called MagTrak{sup TM} which combines the quality and advantages of cable MR-T{sub 2} measurements with a minimum of vibration effects, as is shown by MR data from a commercial borehole. [German] Seit 1990 werden Wireline-MR-Messungen kommerziell im Bohrloch durchgefuehrt. In den letzten Jahren wird an Messgeraeten gearbeitet, die bereits waehrend des Bohrens MR-Daten aufzeichnen (Logging While Drilling, LWD). Dazu wird ein MR-Sensor in den Bohrstrang integriert. Neben der schnelleren Verfuegbarkeit der MR-Daten besteht ein grosser Vorteil der LWD-MR-Messung darin, dass die Daten bereits kurz nach dem Bohren gemessen werden. Die Invasion von Bohrlochspuelung in die Formation dauert dann noch nicht lange an, und die MR-Messung findet im relativ unveraenderten Gestein statt. Probleme beim Einsatz von MR-Messgeraeten waehrend des Bohrens werden vor allem durch die Bewegungen des Bohrstranges verursacht. Vibrationen des MR-Sensors fuehren zu veraenderten Messbedingungen waehrend des Messvorgangs, was zu Verzerrungen im MR-Signal fuehren kann. Den Aufbau des Messgeraetes so zu optimieren, dass Vibrationen einen moeglichst kleinen Einfluss auf die Messung haben, ist ein aktuelles Ziel der heutigen LWD-MR-Entwicklung. In diesem Artikel werden vibrationsverursachte Signalfehler erklaert und Massnahmen genannt, die die

  15. Drilling subsurface wellbores with cutting structures

    Science.gov (United States)

    Mansure, Arthur James; Guimerans, Rosalvina Ramona

    2010-11-30

    A system for forming a wellbore includes a drill tubular. A drill bit is coupled to the drill tubular. One or more cutting structures are coupled to the drill tubular above the drill bit. The cutting structures remove at least a portion of formation that extends into the wellbore formed by the drill bit.

  16. Prevention and mitigation of steam-generator water-hammer events in PWR plants

    International Nuclear Information System (INIS)

    Han, J.T.; Anderson, N.

    1982-11-01

    Water hammer in nuclear power plants is an unresolved safety issue under study at the NRC (USI A-1). One of the identified safety concerns is steam generator water hammer (SGWH) in pressurized-water reactor (PWR) plants. This report presents a summary of: (1) the causes of SGWH; (2) various fixes employed to prevent or mitigate SGWH; and (3) the nature and status of modifications that have been made at each operating PWR plant. The NRC staff considers that the issue of SGWH in top feedring designs has been technically resolved. This report does not address technical findings relevant to water hammer in preheat type steam generators. 10 figures, 2 tables

  17. Influence of fluiddynamic parameters upon fluid-hammer forces and spectra

    International Nuclear Information System (INIS)

    Meder, G.; Grams, J.

    1984-01-01

    For proper dynamic calculation of piping systems under fluid-hammer loading it is necessary to know the frequency content of the fluid-hammer force. Therefore, in this paper, the spectra of fluid-hammer loading will be examined. In particular, the influence of a change of fluiddynamic parameters upon the spectra will be investigated. When changes are made, the normal result is a change or shift in the frequency content of the spectra. However, for changes in certain fluiddynamic parameters, only the force amplitudes are changed. Both types of changes will be discussed. (orig.)

  18. Validation of CATHENA MOD-3.5/Rev0 for single-phase water hammer

    International Nuclear Information System (INIS)

    Beuthe, T.G.

    2000-01-01

    This paper describes work performed to validate the system thermalhydraulics code CATHENA MOD-3.5c/Rev0 for single-phase water hammer. Simulations were performed and are compared quantitatively against numerical tests and experimental results from the Seven Sisters Water Hammer Facility to demonstrate CATHENA can predict the creation and propagation of pressure waves when valves are opened and closed. Simulations were also performed to show CATHENA can model the behaviour of reflected and transmitted pressure waves at area changes, dead ends, tanks, boundary conditions, and orifices in simple and more complex piping systems. The CATHENA results are shown to calculate pressure and wave propagation speeds to within 0.2% and 0.5% respectively for numerical tests and within 3.3% and 5% for experimental results respectively. These results are used to help validate CATHENA for use in single-phase water hammer analysis. They also provide assurance that the fundamental parameters needed to successfully model more complex forms of water hammer are accounted for in the MOD-3.5c/Rev0 version of CATHENA, and represent the first step in the process to validate the code for use in modelling two-phase water hammer and condensation-induced water hammer. (author)

  19. Newberry exploratory slimhole: Drilling and testing

    Energy Technology Data Exchange (ETDEWEB)

    Finger, J.T.; Jacobson, R.D.; Hickox, C.E.

    1997-11-01

    During July--November, 1995, Sandia National Laboratories, in cooperation with CE Exploration, drilled a 5,360 feet exploratory slimhole (3.895 inch diameter) in the Newberry Known Geothermal Resource Area (KGRA) near Bend, Oregon. This well was part of Sandia`s program to evaluate slimholes as a geothermal exploration tool. During and after drilling the authors performed numerous temperature logs, and at the completion of drilling attempted to perform injection tests. In addition to these measurements, the well`s data set includes: over 4,000 feet of continuous core (with detailed log); daily drilling reports from Sandia and from drilling contractor personnel; daily drilling fluid record; and comparative data from other wells drilled in the Newberry KGRA. This report contains: (1) a narrative account of the drilling and testing, (2) a description of equipment used, (3) a brief geologic description of the formation drilled, (4) a summary and preliminary interpretation of the data, and (5) recommendations for future work.

  20. Impact Dynamics of a Percussive System Based on Rotary-Percussive Ultrasonic Drill

    Directory of Open Access Journals (Sweden)

    Yinchao Wang

    2017-01-01

    Full Text Available This paper presents an impact dynamic analysis of a percussive system based on rotary-percussive ultrasonic drill (RPUD. The RPUD employs vibrations on two sides of one single piezoelectric stack to achieve rotary-percussive motion, which improves drilling efficiency. The RPUD’s percussive system is composed of a percussive horn, a free mass, and a drill tool. The percussive horn enlarges longitudinal vibration from piezoelectric stack and delivers the vibration to the drill tool through the free mass, which forms the percussive motion. Based on the theory of conservation of momentum and Newton’s impact law, collision process of the percussive system under no-load condition is analyzed to establish the collision model between the percussive horn, the free mass, and the drill tool. The collision model shows that free mass transfers high-frequency small-amplitude vibration of percussive horn into low-frequency large-amplitude vibration of drill tool through impact. As an important parameter of free mass, the greater the weight of the free mass, the higher the kinetic energy obtained by drill tool after collision. High-speed camera system and drilling experiments are employed to validate the inference results of collision model by using a prototype of the RPUD.

  1. Fifty Years of Soviet and Russian Drilling Activity in Polar and Non-Polar Ice: A Chronological History

    Science.gov (United States)

    2007-10-01

    cable being separated from the drill, and further drilling ceased. The drilling operation consisted of three men working one shift. They achieved a...thickness is 160–180 m according to radio-echo sounding data. A 93-m-deep hole was drilled by two men over 127 hours (the total penetration time of...TR-07-20 89 Figure 31. KEMS-112 electro-mechanical core drill: (1) drill head, (2) core barrel, (3) nipple , (4) barrel, (5) chip filter, (6

  2. Condensation induced water hammer in steam generators

    International Nuclear Information System (INIS)

    Jones, O.C. Jr.; Saha, P.; Wu, B.J.C.; Ginsberg, T.

    1979-06-01

    The case of condensation induced water hammer in nuclear steam generators is summarized, including both feed ring-type and economizer-type geometries. A slug impact model is described and used to demonstrate the parametric dependence of the impact pressures on heat transfer rates, initial pressures, and relative initial slug and void lengths. The results of the parametric study are related also to the economizer geometry and a suggested alternative model is presented. The importance of concerns regarding attenuation of shocks in two-phase media is delineated, and a simple experiment is described which was used to determine negligible attenuation within the accuracy of the experiment for void fractions up to over 30% in bubbly and slug flows

  3. HAMMER: Reweighting tool for simulated data samples

    CERN Document Server

    Duell, Stephan; Ligeti, Zoltan; Papucci, Michele; Robinson, Dean

    2016-01-01

    Modern flavour physics experiments, such as Belle II or LHCb, require large samples of generated Monte Carlo events. Monte Carlo events often are processed in a sophisticated chain that includes a simulation of the detector response. The generation and reconstruction of large samples is resource-intensive and in principle would need to be repeated if e.g. parameters responsible for the underlying models change due to new measurements or new insights. To avoid having to regenerate large samples, we work on a tool, The Helicity Amplitude Module for Matrix Element Reweighting (HAMMER), which allows one to easily reweight existing events in the context of semileptonic b → q ` ̄ ν ` analyses to new model parameters or new physics scenarios.

  4. Horizontal directional drilling: a green and sustainable technology for site remediation.

    Science.gov (United States)

    Lubrecht, Michael D

    2012-03-06

    Sustainability has become an important factor in the selection of remedies to clean up contaminated sites. Horizontal directional drilling (HDD) is a relatively new drilling technology that has been successfully adapted to site remediation. In addition to the benefits that HDD provides for the logistics of site cleanup, it also delivers sustainability advantages, compared to alternative construction methods.

  5. A model for self-defocusing in laser drilling of polymeric materials

    International Nuclear Information System (INIS)

    Zhang Chong; Quick, Nathaniel R.; Kar, Aravinda

    2008-01-01

    A numerical thermal model is presented for laser microvias drilling in multilayer electronic substrates with Nd:YAG (YAG denotes yttrium aluminum garnet) and CO 2 lasers. Such substrates have different optical properties such as the refractive index and absorption coefficient at these two laser wavelengths, resulting in different drilling mechanisms. Since the skin depth of the polymer is large for both the lasers, volumetric heating is considered in the model. As soon as a small cavity is formed during the drilling process, the concave curvature of the drilling front acts as a concave lens that diverges the incident laser beam. This self-defocusing effect can greatly reduce the drilling speed as predicted by the model. This effect makes the refractive index of the substrate at different wavelengths an important parameter for laser drilling. The model was used to calculate the laser ablation thresholds which were found to be 8 and 56 J/cm 2 for the CO 2 and Nd:YAG lasers respectively. Due to the expulsion of materials because of high internal pressures in the case of Nd:YAG laser microvia drilling, the ablation threshold may be far below the calculated value. A particular laser beam shape, such as pitch fork, was found to drill better holes than the Gaussian beam

  6. PERFORMANCE OF A GRAIN DRILL IN FUNCTION OF SOIL TILLAGE AND MAIZE CROP SPACING DESEMPENHO DE SEMEADORA-ADUBADORA EM FUNÇÃO DO PREPARO DE SOLO E ESPAÇAMENTO DA CULTURA DO MILHO

    Directory of Open Access Journals (Sweden)

    Flávio Hiroshi Kaneko

    2010-10-01

    Full Text Available

    The performance of machines and agricultural implements are of fundamental importance, especially when subjected to different types of soil tillage, and have to adapt to these conditions, in order to promote good operational performance. The objective of this study was to analyze the operational performance of a Marchesan Supreme Cop grain drill, equipped with four rows, spaced 0.90 m, according to three types of tillage: conventional tillage (plowing and two harrowing series, reduced tillage (scarification with a roller, and no-tillage, in areas previously seeded with maize (Zea mays L., at two spacing measures (0.90 m and 0.45 m. The results indicate that the demand for power, tensile stress, and motor rotation, in the sowing operation, were not influenced by tillage and maize crop. The tractor wheel slip showed different results, being lower in no

  7. A new adjustable parallel drill guide for internal fixation of femoral neck fracture: a developmental and experimental study.

    Science.gov (United States)

    Yuenyongviwat, Varah; Tuntarattanapong, Pakjai; Tangtrakulwanich, Boonsin

    2016-01-11

    Internal fixation is one treatment for femoral neck fracture. Some devices and techniques reported improved accuracy and decreased fluoroscopic time. However, these are not widely used nowadays due to the lack of available special instruments and techniques. To improve the surgical procedure, the authors designed a new adjustable drill guide and tested the efficacy of the device. The authors developed a new adjustable drill guide for cannulated screw guide wire insertion for multiple screw fixation. Eight orthopaedic surgeons performed the experimental study to evaluate the efficacy of this device. Each surgeon performed guide wire insertion for multiple screw fixation in six synthetic femurs: three times with the new device and three times with the conventional technique. The fluoroscopic time, operative time and surgeon satisfaction were evaluated. In the operations with the new adjustable drill guide, the fluoroscopic and operative times were significantly lower than the operations with the conventional technique (p level of satisfaction of this device was also statistically significantly better (p = 0.02) than the conventional technique. The fluoroscopic and operative times with the new adjustable drill guide were reduced for multiple screw fixation of femoral neck fracture and the satisfaction of the surgeons was good.

  8. Determination of transient temperature distribution inside a wellbore considering drill string assembly and casing program

    International Nuclear Information System (INIS)

    Yang, Mou; Zhao, Xiangyang; Meng, Yingfeng; Li, Gao; Zhang, Lin; Xu, Haiming; Tang, Daqian

    2017-01-01

    Highlights: • The different wellbore conditions of heat transfer models were developed. • Drill string assembly and casing programs impact on down-hole temperatures. • The thermal performance in circulation and shut-in stages were deeply investigated. • Full-scale model coincided with the measured field data preferably. - Abstract: Heat exchange efficiency between each region of the wellbore and formation systems is influenced by the high thermal conductivity of the drill string and casing, which further affects temperature distribution of the wellbore. Based on the energy conservation principle, the Modified Raymond, Simplified and Full-scale models were developed, which were solved by the fully implicit finite difference method. The results indicated that wellbore and formation temperatures were significantly influenced at the connection points between the drill collar and drill pipe, as well as the casing shoe. Apart from the near surface, little change was observed in temperature distribution in the cement section. In the open-hole section, the temperature rapidly decreased in the circulation stage and gradually increased in the shut-in stage. Most important, the simulated result from the full-scale model coincided with the measured field data better than the other numerical models. These findings not only confirm the effect of the drill string assembly and casing programs on the wellbore and formation temperature distribution, but also contribute to resource exploration, drilling safety and reduced drilling costs.

  9. Accuracy improvements of gyro-based measurement-while-drilling surveying instruments by a laser testing method

    Science.gov (United States)

    Li, Rong; Zhao, Jianhui; Li, Fan

    2009-07-01

    Gyroscope used as surveying sensor in the oil industry has been proposed as a good technique for measurement-whiledrilling (MWD) to provide real-time monitoring of the position and the orientation of the bottom hole assembly (BHA).However, drifts in the measurements provided by gyroscope might be prohibitive for the long-term utilization of the sensor. Some usual methods such as zero velocity update procedure (ZUPT) introduced to limit these drifts seem to be time-consuming and with limited effect. This study explored an in-drilling dynamic -alignment (IDA) method for MWD which utilizes gyroscope. During a directional drilling process, there are some minutes in the rotary drilling mode when the drill bit combined with drill pipe are rotated about the spin axis in a certain speed. This speed can be measured and used to determine and limit some drifts of the gyroscope which pay great effort to the deterioration in the long-term performance. A novel laser assembly is designed on the wellhead to count the rotating cycles of the drill pipe. With this provided angular velocity of the drill pipe, drifts of gyroscope measurements are translated into another form that can be easy tested and compensated. That allows better and faster alignment and limited drifts during the navigation process both of which can reduce long-term navigation errors, thus improving the overall accuracy in INS-based MWD system. This article concretely explores the novel device on the wellhead designed to test the rotation of the drill pipe. It is based on laser testing which is simple and not expensive by adding a laser emitter to the existing drilling equipment. Theoretical simulations and analytical approximations exploring the IDA idea have shown improvement in the accuracy of overall navigation and reduction in the time required to achieve convergence. Gyroscope accuracy along the axis is mainly improved. It is suggested to use the IDA idea in the rotary mode for alignment. Several other

  10. Development of a high-temperature diagnostics-while-drilling tool.

    Energy Technology Data Exchange (ETDEWEB)

    Chavira, David J.; Huey, David (Stress Engineering Services, Inc.); Hetmaniak, Chris (Stress Engineering Services, Inc.); Polsky, Yarom; King, Dennis K.; Jacobson, Ronald David; Blankenship, Douglas Alan; Knudsen, Steven Dell; Henfling, Joseph Anthony; Mansure, Arthur James

    2009-01-01

    been fielded in cost-sharing efforts with an industrial partner to support the development of new generation hard-rock drag bits. Following the demonstrated success of the POC DWD system, efforts were initiated in FY05 to design, fabricate and test a high-temperature (HT) capable version of the DWD system. The design temperature for the HT DWD system was 225 C. Programmatic requirements dictated that a HT DWD tool be developed during FY05 and that a working system be demonstrated before the end of FY05. During initial design discussions regarding a high-temperature system it was decided that, to the extent possible, the HT DWD system would maintain functionality similar to the low temperature system, that is, the HT DWD system would also be designed to provide the driller with real-time information on bit and bottom-hole-assembly (BHA) dynamics while drilling. Additionally, because of time and fiscal constraints associated with the HT system development, the design of the HT DWD tool would follow that of the LT tool. The downhole electronics package would be contained in a concentrically located pressure barrel and the use of externally applied strain gages with thru-tool connectors would also be used in the new design. Also, in order to maximize the potential wells available for the HT DWD system and to allow better comparison with the low-temperature design, the diameter of the tool was maintained at 7-inches. This report discusses the efforts associated with the development of a DWD system capable of sustained operation at 225 C. This report documents work performed in the second phase of the Diagnostics-While-Drilling (DWD) project in which a high-temperature (HT) version of the phase 1 low-temperature (LT) proof-of-concept (POC) DWD tool was built and tested. Descriptions of the design, fabrication and field testing of the HT tool are provided. Background on prior phases of the project can be found in SAND2003-2069 and SAND2000-0239.

  11. Optimal parameters to avoid thermal necrosis during bone drilling: A finite element analysis.

    Science.gov (United States)

    Mediouni, Mohamed; Schlatterer, Daniel R; Khoury, Amal; Von Bergen, Tobias; Shetty, Sunil H; Arora, Manit; Dhond, Amit; Vaughan, Neil; Volosnikov, Alexander

    2017-11-01

    The drilling bone may potentially cause excessive frictional heat, which can lead to local bone necrosis. This heat generation and local necrosis has been suggested to contribute to the resorption of bone around the placed screws, ending in loss of screw purchase in the bone and inadvertent loosening and/or the bone-implant construct. In vivo studies on this subject have inherent obstacles not the least of which is controlling the variables and real time bone temperature data acquisition. Theoretical models can be generated using computer software and the inclusion of known constants for the mechanical properties of metal and bone. These known Data points for the variables (drill bit and bone) enables finite element analysis of various bone drilling scenarios. An elastic-plastic three-dimensional (3D) acetabular bone mode was developed and finite element model analysis (FEA) was applied to various simulated drilling procedures. The FEA results clearly indicate that the depth of drilling and the drill speed both have a significant effect on the temperature during drilling procedures. The reduction of the feeding speed leads to a reduction in bone temperature. Our data suggests that reducing the feeding speed regardless of RPMs and pressure applied could be a simple useful and effective way to reduce drilling temperatures. This study is the first step in helping any surgeon who drills bone and places screws to better understand the ideal pressure to apply and drill speed to employ and advance rate to avoid osteonecrosis. © 2017 Orthopaedic Research Society. Published by Wiley Periodicals, Inc. J Orthop Res 35:2386-2391, 2017. © 2017 Orthopaedic Research Society. Published by Wiley Periodicals, Inc.

  12. Drilling contracts and incentives

    International Nuclear Information System (INIS)

    Osmundsen, Petter; Sorenes, Terje; Toft, Anders

    2008-01-01

    Shortages of rigs and personnel have encouraged discussion of designing incentive contracts in the drilling sector. However, for the drilling contracts, there are not a large variety of contract types in use. This article describes and analyses incentives for drilling contractors. These are directly represented by the compensation formats utilised in the present and in the consecutive drilling contracts. Indirectly, incentives are also provided by the evaluation criteria that oil companies use for awarding drilling assignments. Changes in contract format pose a number of relevant questions relating to resource management, and the article takes an in-depth look at some of these. Do evaluation criteria for awarding drilling assignments encourage the development of new technology and solutions? How will a stronger focus on drilling efficiency influence reservoir utilisation?

  13. Drilling mud

    Energy Technology Data Exchange (ETDEWEB)

    Babets, M A; Nechayev, N D; Vinogradova, G P

    1982-01-01

    A drilling mud is proposed which contains clay, alkali, water and stabilizer reagent. It is distinguished by the fact that in order to improve the viscosity and static shear stress, the stabilizer reagent contained is composted solid general wastes with the following ratio of components (% by weight): clay 10-15, alkali 0.1-0.2; composted solid general wastes 2-5; water--the rest.

  14. Effect of Nitric Acid on the Low Fluorescing Performance of Drilling Fluid Lubricant Based Animal and Vegetable Oils

    Directory of Open Access Journals (Sweden)

    Feng-shan Zhou

    2013-01-01

    Full Text Available After synthesis of mixed fatty acid triethanolamine ester surfactant based on animal and vegetable mixed oils, the reaction solution was added into 4% (wt/wt liquid nitric acid or 9% (wt/wt solid nitric acid as eliminating fluorescent agent continuing to react from 1 to 2 hours. The low fluorescence lubricant named E167 for drilling fluid was prepared, in which maximum fluorescence intensity (Fmax was less than 10 in three-dimensional fluorescence spectra of excitation wavelength range. When the E167 was added into fresh water based drilling fluid at the dosage of 0.5% (wt/wt, the sticking coefficient reduced rate (ΔKf is 78% and the extreme pressure (E-P friction coefficient reduced rate (Δf is 79%. In the case of 4% brine mud with 0.5% (wt/wt E167 in it, the ΔKf and Δf are 75% and 62%, respectively. After the hot rolling ageing test 180°C × 16 h with the E167 was added into fresh water based drilling fluid at the dosage of 1% (wt/wt, the ΔKf and Δf are greater than 70%, which shows a much better lubrication properties of strong resistance to high temperature. The fresh water based drilling fluid which contains 1% (wt/wt E167 is almost nonfoaming even after hot rolling ageing 120°C × 16 h.

  15. Systematic methodology for diagnosis of water hammer in LWR power plants

    International Nuclear Information System (INIS)

    Safwat, H.H.; Arastu, A.H.; Husaini, S.M.

    1990-01-01

    The paper gives the dimensions of the knowledge base that is necessary to carry out a diagnosis of water hammer susceptibility/root cause analyses for Pressurized Water Reactor (PWR) and Boiling Water Reactor (BWR) nuclear power plant systems. After introducing some fundamentals, water hammer phenomena are described. Situations where each phenomenon is encountered are given and analytical models capable of simulating the phenomena are referenced. Water hammer events in operating plants and their inclusion in the knowledge base is discussed. The diagnostic methodology is presented through an application on a system in a typical light water reactor plant. The methodology presented serves as a possible foundation for the creation of an expert water hammer diagnosis system. (orig.)

  16. Water hammer experiences in the startup and early operation of the Shearon Harris plant

    International Nuclear Information System (INIS)

    Casada, D.A.

    1987-01-01

    During the course of preoperational testing and early operation of the Shearon Harris Nuclear Power Plant, several water hammer events have occurred. A description of the events and corrective/preventive measures taken are discussed

  17. Effects of air vessel on water hammer in high-head pumping station

    International Nuclear Information System (INIS)

    Wang, L; Wang, F J; Zou, Z C; Li, X N; Zhang, J C

    2013-01-01

    Effects of air vessel on water hammer process in a pumping station with high-head were analyzed by using the characteristics method. The results show that the air vessel volume is the key parameter that determines the protective effect on water hammer pressure. The maximum pressure in the system declines with increasing air vessel volume. For a fixed volume of air vessel, the shape of air vessel and mounting style, such as horizontal or vertical mounting, have little effect on the water hammer. In order to obtain good protection effects, the position of air vessel should be close to the outlet of the pump. Generally, once the volume of air vessel is guaranteed, the water hammer of a entire pipeline is effectively controlled

  18. Effects of air vessel on water hammer in high-head pumping station

    Science.gov (United States)

    Wang, L.; Wang, F. J.; Zou, Z. C.; Li, X. N.; Zhang, J. C.

    2013-12-01

    Effects of air vessel on water hammer process in a pumping station with high-head were analyzed by using the characteristics method. The results show that the air vessel volume is the key parameter that determines the protective effect on water hammer pressure. The maximum pressure in the system declines with increasing air vessel volume. For a fixed volume of air vessel, the shape of air vessel and mounting style, such as horizontal or vertical mounting, have little effect on the water hammer. In order to obtain good protection effects, the position of air vessel should be close to the outlet of the pump. Generally, once the volume of air vessel is guaranteed, the water hammer of a entire pipeline is effectively controlled.

  19. Bucket drill

    Energy Technology Data Exchange (ETDEWEB)

    Bezverkhiy, V.M.; Nabokov, I.M.; Podoksik, D.Z.; Sadovskiy, S.S.; Shanyukevich, V.A.

    1983-01-01

    The bucket drill including a cylindrical housing with bottom, ground intake windows and cutting knives is hinged to the housing, the mechanism of rotation of the cutting knives including rods connected by the cutter knives, and drive shaft is distinguished by the fact that in order to improve the effectiveness of drilling by automatic change in the angle of cutting depending on the strength of the drillable rock, the drill is equipped with elastic elements and cap with annular slits in which there are elastic elements. The mechanism of rotation of the cutting knives is equipped with levers hinged to the housing, pins with shaft and rocker arm. The rods are made with a slit and from one end are rigidly connected to the cutting knives, and from the other end to the levers by means of pins which are arranged in slits of the rod with the possibility of movement. The upper ends of the levers are installed with the possibility of movement in the pins whose shafts are arranged with the possibility of rotation in the rocker arm rigidly connected to the drive shaft. The drive shaft is equipped with cantilevers installed in the cap with the possibility of rotation and interaction with the elastic elements.

  20. Mathematical Methodology for New Modeling of Water Hammer in Emergency Core Cooling System

    International Nuclear Information System (INIS)

    Lee, Seungchan; Yoon, Dukjoo; Ha, Sangjun

    2013-01-01

    In engineering insight, the water hammer study has carried out through the experimental work and the fluid mechanics. In this study, a new access methodology is introduced by Newton mechanics and a mathematical method. Also, NRC Generic Letter 2008-01 requires nuclear power plant operators to evaluate the effect of water-hammer for the protection of pipes of the Emergency Core Cooling System, which is related to the Residual Heat Removal System and the Containment Spray System. This paper includes modeling, the processes of derivation of the mathematical equations and the comparison with other experimental work. To analyze the effect of water-hammer, this mathematical methodology is carried out. This study is in good agreement with other experiment results as above. This method is very efficient to explain the water-hammer phenomena