  1. Prototype plant for nuclear process heat (PNP) - operation of the pilot plant for hydrogasification of coal

    International Nuclear Information System (INIS)

    Bruengel, N.; Dehms, G.; Fiedler, P.; Gerigk, H.P.; Ruddeck, W.; Schrader, L.; Schumacher, H.J.

    1988-04-01

    The Rheinische Braunkohlenwerke AG developed the process of hydrogasification of coal in a fluidized bed for generation of SNG. On basis of test results obtained in a semi-technical pilot plant of a through-put of 250 kg/h dried coal a large pilot plant was erected processing 10 t/h dried brown coal. This plant was on stream for about 14700 h, of which about 7800 h were with gasifier operation; during this time about 38000 t of dried brown coal of the Rhenish district were processed containing 4 to 25% of ash. At pressures of 60 to 120 bar and temperatures of 800 to 935 0 C carbon conversion rates up to 81 percent and methane amounts of 5000 m 3 (STP)/h were reached. The decisive parameter for methane generation was the hydrogen/coal-ratio. Even at high moisture contents, usually diminishing the methane yield from the coal essentially, by high hydrogen/coal-ratios high methane yields could be obtained. The gasifier itself caused no troubles during the total time operation. Difficulties with the original design of the residual char cooler could be overcome by change-over from water injection to liquid carbon dioxide. The design of the heat recovery system proved well. Alltogether so the size increasement of the gasifier from the semi-technical to the large pilot plant as well as the harmonization of gas generation and gas refining was proved. (orig.) With 20 refs., 20 tabs., 81 figs [de

  2. Pilot plant for hydrogasification of coal with nuclear heat

    International Nuclear Information System (INIS)

    Falkenhain, G.; Velling, G.

    1976-01-01

    In the framework of a research and development programme sponsored by the Ministry of Research and Technology of the Federal Republic of Germany, two process variants for hydrogasification of coal by means of nuclear heat have been developed by the Rheinische Braunkohlenwerke AG, Cologne. For testing these process variants a semi-technical pilot plant for gasification of coal under pressure in a fluidized bed was constructed. The pilot plant, in which the gasification of lignite and hard coal is planned, is designed for a throughput of 100kg carbon per hour corresponding to 400kg raw lignite per hour or 150kg hard coal per hour. The plant should provide data on the influence of the most essential process parameters (pressure, temperature, residence time of gas and coal, type and pre-treatment of feed coal) on the performance of gasification and raw gas composition. Different plant components will also be tested. Since the pilot plant will permit testing of both process variants of hydrogasification, it was designed in such a way that it is possible to vary a great number of process parameters. Thus, for instance, the pressure can be chosen in a range up to 100 bar and pure hydrogen or mixtures of hydrogen, carbon monoxide and steam can be applied as gasification agents. The gasifier is an internally insulated fluidized bed reactor with an inner diameter of 200mm and a height of about 8m, to which an internally insulated cyclone for separation of the entrained fines is attached. The raw gas is then cooled down by direct water scrubbing. (author)

  3. Operation of a semi-technical pilot plant for nuclear aided steam gasification of coal

    International Nuclear Information System (INIS)

    Kirchhoff, R.; Heek, K.H. van; Juentgen, H.; Peters, W.

    1984-01-01

    After intensive investigations on a small scale, the principle of the process has been tested in a semi-technical pilot plant. In its gasifier a fluidized bed of approx. 1 m 2 cross-section and of up to 4 m height is operated at 40 bar. Heat is supplied to the bed from an immersed heat exchanger with helium flowing through it, which is heated electrically. The plant was commissioned in 1976 and has been in hot operation for approx. 23000 h, over 13000 h whereof account for coal gasification. Roughly 1600 t of coal have been put through. During recent years the processing of German caking long-flame gas coal and the marked improvement of the process by the use of catalysts have been demonstrated successfully. (orig.)

  4. Assessment of materials selection and performance for direct-coal- liquefaction plants in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, A.R.; Judkins, R.R.; Keiser, J.R.

    1996-09-01

    Several direct coal liquefaction processes have been demonstrated at the pilot plant level in the United States. Presently only one plant remains operational, namely, the Hydrocarbon Technologies, Inc., 4.0- ton-per-day process development unit in Lawrenceville, New Jersey. The period from 1974 to 1982 saw the greatest amount of development of direct coal liquefaction in the United States with four major pilot plants being devoted to variants of this technology. The plants included the SRC-I plant at Wilsonville, Alabama, which operated from 1974 to 1992; the SRC-I/II plant at Fort Lewis, Washington, which operated from 1974 to 1981; the H-Coal plant at Catlettsburg, Kentucky, which operated from 1980 to 1982; and the Exxon Coal Liquefaction Pilot Plant at Baytown, Texas, which operated from 1980 to 1982. Oak Ridge National Laboratory scientists and engineers were actively involved in many phases and technical disciplines at all four of these plants, especially in materials testing, evaluation, and failure analyses. In addition, ORNL materials scientists and engineers conducted reviews of the demonstration and commercial plant designs for materials selections. The ORNL staff members worked closely with materials engineers at the pilot plants in identifying causes of materials degradation and failures, and in identifying solutions to these problems. This report provides a comprehensive summary of those materials activities. Materials performance data from laboratory and coal liquefaction pilot plant tests, failure analyses, and analyses of components after use in pilot plants were reviewed and assessed to determine the extent and causes of materials degradation in direct coal liquefaction process environments. Reviews of demonstration and commercial plant design documents for materials selections were conducted. These reviews and assessments are presented to capture the knowledge base on the most likely materials of construction for direct coal liquefaction plants.

  5. Pressurized fluidized bed combustion combined cycle power plant with coal gasification: Second generation pilot plant

    International Nuclear Information System (INIS)

    Farina, G.L.; Bressan, L.

    1991-01-01

    This paper presents the technical and economical background of a research and development program of a novel power generation scheme, which is based on coal gasification, pressurized fluid bed combustion and combined cycles. The participants in this program are: Foster Wheeler (project leader), Westinghouse, IGT and the USA Dept. of Energy. The paper describes the characteristics of the plant, the research program in course of implementation, the components of the pilot plant and the first results obtained

  6. Report on 1979 result of Sunshine Project (detailed design). Part 1. Forty t/day solvolysis coal liquefaction pilot plant; 1979 nendo 40T/nichi solvolysis sekitan pilot plant shosai sekkei. 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-03-01

    The subject design documents are the compilation of the result of the design operation for the 'detailed design of 40 t/day class solvolysis coal liquefaction pilot plant'. The design of this pilot plant was conducted using, as the fundamental reference, the basic data provided by Kyushu National Industrial Research Institute and Kyushu University and the results of a contract research on '1 t/day class solvolysis coal liquefaction plant'. The subject detailed design was intended for Phase 1 centering on a single stage liquefaction - coal liquefaction (transformation into pitch) by solvolysis liquefaction reaction. The areas covered consists of the pre-treatment process, material mixing process, reaction process, reaction freezing process, coke separation process, SR recovery process, pitch refining process, utility facilities, and waste water treatment facilities. Incidentally, the processes for which the design operation has been completed this year, particularly the reaction process, coke separation process, SR recovery process, etc., are in the field untrodden technologically in the world; therefore, their design method is supposed to be established from the results of the R and D on coal liquefaction, '1 t/day class solvolysis coal liquefaction plant.' (NEDO)

  7. Report on 1979 result of Sunshine Project (detailed design). Part 1. Forty t/day solvolysis coal liquefaction pilot plant; 1979 nendo 40T/nichi solvolysis sekitan pilot plant shosai sekkei. 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-03-01

    The subject design documents are the compilation of the result of the design operation for the 'detailed design of 40 t/day class solvolysis coal liquefaction pilot plant'. The design of this pilot plant was conducted using, as the fundamental reference, the basic data provided by Kyushu National Industrial Research Institute and Kyushu University and the results of a contract research on '1 t/day class solvolysis coal liquefaction plant'. The subject detailed design was intended for Phase 1 centering on a single stage liquefaction - coal liquefaction (transformation into pitch) by solvolysis liquefaction reaction. The areas covered consists of the pre-treatment process, material mixing process, reaction process, reaction freezing process, coke separation process, SR recovery process, pitch refining process, utility facilities, and waste water treatment facilities. Incidentally, the processes for which the design operation has been completed this year, particularly the reaction process, coke separation process, SR recovery process, etc., are in the field untrodden technologically in the world; therefore, their design method is supposed to be established from the results of the R and D on coal liquefaction, '1 t/day class solvolysis coal liquefaction plant.' (NEDO)

  8. Achievement report for fiscal 1982 on Sunshine Program. Research and development of coal liquefaction technology (Conceptual designs for coal liquefaction pilot plants - Solvent extraction liquefaction process); 1982 nendo sekitan ekika gijutsu no kenkyu kaihatsu seika hokokusho. Sekitan ekika pilot plant no gainen sekkei (yozai chushutsu ekikaho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-03-01

    This research aims to prepare conceptual designs for a 250t/d-class and 500t/d-class coal liquefaction pilot plants based on the achievement of research on solvent extraction liquefaction of coal. It also aims to define the solvent extraction process and provide decision-making material relative to the development and promotion of coal liquefaction technologies in the future. Development started in 1978 of the technology of solvent extraction liquefaction of coal, and a 1t/d PDU (process development unit) was completed in 1981. Studies through its operation have continued for more than 3000 hours already, and technical data are being accumulated steadily. Techniques acquired through operating the 1t/d PDU have been put together, and rough process conditions are established. A rough process result is achieved of the same conditions. In these two respects, the newly developed process is equal to other processes. The phenomena in this process are roughly grasped. It is deemed that, with the existing technique combined with the technique acquired here, a technological level has been reached where conceptual designs of large pilot plants may be worked out for solvent extraction liquefaction of coal. Under the circumstances, with a view to developing a commercial plant whose main products will be fuel oils, conceptual designs are prepared for large pilot plants, and are compiled into this report. (NEDO)

  9. FY 1990 report on the results of the development of the entrained bed coal gasification power plant. Part 2. Fabrication/installation of pilot plant; 1990 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Pilot plant seisaku suetsuke hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, fabrication/installation work, etc. were made for a pilot plant of 200t/d entrained bed coal gasification power generation, and the FY 1990 results were summarized. Construction work of a pilot plant of coal gasification power generation was at its peak in April 1990, and installation/piping work for each facility/equipment was carried out. In May, transportation/installation of gas turbine and generator were started. In June, installation of equipment of the 66kV special high voltage switching station was conducted, and the initial power receiving of 6.9kV was conducted. In August, inspection before use was made of the main piping of the gasifier equipment, gas refining equipment and gas turbine equipment. In December, trial unit operation of each equipment and interlock test were carried out. 'The integrated plant protection interlock test' was made from January 21 to February 21, 1991, and the favorable results were obtained. On February 28, a ceremony to celebrate the completion of all facilities of pilot plant was made. In March, drying of gasifier and initial firing by light oil were conducted, and all the work was completed on March 25. (NEDO)

  10. FY 1990 report on the results of the development of the entrained bed coal gasification power plant. Part 2. Fabrication/installation of pilot plant; 1990 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Pilot plant seisaku suetsuke hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, fabrication/installation work, etc. were made for a pilot plant of 200t/d entrained bed coal gasification power generation, and the FY 1990 results were summarized. Construction work of a pilot plant of coal gasification power generation was at its peak in April 1990, and installation/piping work for each facility/equipment was carried out. In May, transportation/installation of gas turbine and generator were started. In June, installation of equipment of the 66kV special high voltage switching station was conducted, and the initial power receiving of 6.9kV was conducted. In August, inspection before use was made of the main piping of the gasifier equipment, gas refining equipment and gas turbine equipment. In December, trial unit operation of each equipment and interlock test were carried out. 'The integrated plant protection interlock test' was made from January 21 to February 21, 1991, and the favorable results were obtained. On February 28, a ceremony to celebrate the completion of all facilities of pilot plant was made. In March, drying of gasifier and initial firing by light oil were conducted, and all the work was completed on March 25. (NEDO)

  11. Demonstration test of electron beam flue gas treatment pilot plant of a coal fired thermal power station

    International Nuclear Information System (INIS)

    Doi, Yoshitaka; Hayashi, Kazuaki; Izutsu, Masahiro; Watanabe, Shigeharu; Namba, Hideki; Tokunaga, Okihiro; Hashimoto, Shoji; Tanaka, Tadashi; Ogura, Yoshimi.

    1995-01-01

    The Japan Atomic Energy Research Institute, Chubu Electric Power Company and Ebara Corporation jointly constructed a pilot plant for electron beam flue gas treatment (dry process) capable of treating 12,000 m 3 /h (NTP) of flue gas from a coal fired boiler, at Shin-Nagoya Thermal Power Station, Chubu Electric Power Company. Various tests carried out at the plant over a period extending one year verified the followings. By appropriately controlling parameters such as electron beam dosage, flue gas temperature, and ammonia stoichiometric amount, highly efficient simultaneous SO 2 and NOx removal from flue gas was achieved under all gas conditions, equal to or more efficient than that by the highest level conventional treatment. The operation of the pilot plant was stable and trouble-free over a long term, and the operation and the process was easy to operate and control. By-products (ammonium sulfate and ammonium nitrate) produced by the flue gas treatment were proven to have superior quality, equivalent to that of market-available nitrogen fertilizers. These by-products had been registered as by-product nitrogen fertilizers. (author)

  12. Pilot plant development of a new catalytic process for improved electrostatic separation of fly-ash in coal fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Olivares del Valle, J.; Salvador Martinez, L.; Muniz Baum, B.; Cortes Galeano, V. [University of Seville, Seville (Spain). Chemical and Environmental Engineering Dept.

    1996-12-31

    A new catalytic process for flue gas conditioning in pulverized coal fired power plants is outlined. Vanadium and platinum catalysts specifically prepared on ceramic honeycomb monoliths to oxidize SO{sub 2} into SO{sub 3} have been tested and evaluated at pilot scale. 10 refs., 3 figs., 2 tabs.

  13. DOLOMITE DESULFURIZATION BEHAVIOR IN A BUBBLING FLUIDIZED BED PILOT PLANT FOR HIGH ASH COAL

    Directory of Open Access Journals (Sweden)

    G. M. F. Gomes

    Full Text Available Abstract Although fluidized bed in situ desulphurization from coal combustion has been widely studied, there are aspects that remain under investigation. Additionally, few publications address Brazilian coal desulphurization via fluidized beds. This study used a 250 kWth bubbling fluidized bed pilot plant to analyze different aspects of the dolomite desulphurization of two Brazilian coals. Superficial velocities of 0.38 and 0.46 m/s, flue gas recycling, Ca/S molar ratios and elutriation were assessed. Results confirmed the influence of the Ca/S molar ratio and superficial velocity - SO2 conversion up to 60.5% was achieved for one coal type, and 70.9% was achieved for the other type. A recycling ratio of 54.6% could increase SO2 conversion up to 86.1%. Elutriation and collection of ashes and Ca-containing products did not present the same behavior because a lower wt. % of CaO was collected by the gas controlled mechanism compared to the ash.

  14. Large Pilot Scale Testing of Linde/BASF Post-Combustion CO2 Capture Technology at the Abbott Coal-Fired Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    O' Brien, Kevin C. [University of Illinois, Champaign, IL (United States)

    2017-08-18

    The work summarized in this report is the first step towards a project that will re-train and create jobs for personnel in the coal industry and continue regional economic development to benefit regions impacted by previous downturns. The larger project is aimed at capturing ~300 tons/day (272 metric tonnes/day) CO2 at a 90% capture rate from existing coal- fired boilers at the Abbott Power Plant on the campus of University of Illinois (UI). It will employ the Linde-BASF novel amine-based advanced CO2 capture technology, which has already shown the potential to be cost-effective, energy efficient and compact at the 0.5-1.5 MWe pilot scales. The overall objective of the project is to design and install a scaled-up system of nominal 15 MWe size, integrate it with the Abbott Power Plant flue gas, steam and other utility systems, and demonstrate the viability of continuous operation under realistic conditions with high efficiency and capacity. The project will also begin to build a workforce that understands how to operate and maintain the capture plants by including students from regional community colleges and universities in the operation and evaluation of the capture system. This project will also lay the groundwork for follow-on projects that pilot utilization of the captured CO2 from coal-fired power plants. The net impact will be to demonstrate a replicable means to (1) use a standardized procedure to evaluate power plants for their ability to be retrofitted with a pilot capture unit; (2) design and construct reliable capture systems based on the Linde-BASF technology; (3) operate and maintain these systems; (4) implement training programs with local community colleges and universities to establish a workforce to operate and maintain the systems; and (5) prepare to evaluate at the large pilot scale level various methods to utilize the resulting captured CO2. Towards the larger project goal, the UI-led team, together

  15. Clean coal technology - Study on the pilot project experiment of underground coal gasification

    International Nuclear Information System (INIS)

    Yang Lanhe; Liang Jie; Yu Li

    2003-01-01

    In this paper, the gasification conditions, the gasifier structure, the measuring system and the gasification rationale of a pilot project experiment of underground coal gasification (UCG) in the Liuzhuang Colliery, Tangshan, are illustrated. The technique of two-phase underground coal gasification is proposed. The detection of the moving speed and the length of the gasification working face is made using radon probing technology. An analysis of the experiment results indicates that the output of air gas is 3000 m 3 /h with a heating value of about 4.18 MJ/m 3 , while the output of water gas is 2000 m 3 /h with a heating value of over 11.00 MJ/m 3 , of which H 2 content is above 40% with a maximum of 71.68%. The cyclical time of two-phase underground gasification is 16 h, with 8 h for each phase. This prolongs the time when the high-heating value gas is produced. The moving speed of the gasification working face in two alternative gasifiers is identified, i.e. 0.204 and 0.487 m/d, respectively. The success of the pilot project experiment of the underground gasification reveals the strides that have been made toward the commercialization of the UCG in China. It also further justifies the reasonability and feasibility of the new technology of long channel, big section, two-phase underground gasification. A conclusion is also drawn that the technology of the pilot project experiment can be popularized in old and discarded coal mines

  16. Achievement report for fiscal 1993 on developing entrained bed coal gasification power plant. Part 2. Summary of tests and researches on pilot plant operation; 1993 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Pilot plant unten shiken kenkyu no gaiyo hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    Tests and researches have been carried out on operation of a 200-t/d entrained bed coal gasification pilot plant built with an objective of establishing the coal gasification composite power generation technology. This paper summarizes the achievements in fiscal 1993. The current fiscal year has performed the test operation on the pilot plant as a whole by using the coal D in continuation from the previous fiscal year. For the gasification furnace facilities, an air variation test was conducted for charging coal into the gasification furnace by using recovered oxygen, wherein satisfactory control was verified on oxygen concentration in the air supplied into the gasification furnace. In the gas refining facilities (dry desulfurizing facilities), the total sulfur concentration at 300 to 650 ppm in the gas produced from the coal gasification furnace was refined to 30 to 100 ppm, having achieved the initial target value. The gas refining facilities (dry dust collecting facilities) have achieved satisfactory result that the entrance dust concentration at 66 to 270 mg/Nm{sup 3} was reduced to the exit dust concentration at 1 to 3 mg/Nm{sup 3}. With respect to the gas turbine facilities, the planned values of output and thermal efficiency were satisfied, having derived good performance characteristics. (NEDO)

  17. Pilot plant experience in electron-beam treatment of iron-ore sintering flue gas and its application to coal boiler flue gas cleanup

    International Nuclear Information System (INIS)

    Kawamura, K.

    1984-01-01

    The present development status of the electron-beam flue gas treatment process, which is a dry process capable of removing SOx and NOx simultaneously, is described. The most advanced demonstration of this process was accomplished with a pilot plant in Japan where the maximum gas flow rate of 10,000 Nm 3 /h of an iron-ore sintering machine flue gas was successfully treated. The byproduct produced in this process is collected as a dry powder which is a mixture of ammonia sulfate and ammonium nitrate and is saleable as a fertilizer or a fertilizer component. A preliminary economic projection showed that this process costs less than the lime scrubber which removes SOx but does not remove NOx. Tests using simulated coal combustion gases suggest that this process will be applicable to coal-fired boiler flue gas treatment as well. However, tests on actual coal-fired flue gases are still required for commercial application decisions. A process development unit program consisting of the design, construction and testing of actual coal-fired power station flue gases is underway in the U.S.A. The design and engineering of the test plant is far advanced and the construction phase will be launched in the very near future. (author)

  18. Summary of the achievements in fiscal 1991 in developing the coal liquefaction technology and the bituminous coal liquefaction technology. Studies by using a pilot plant; 1991 nendo sekitan ekika gijutsu kaihatsu rekiseitan ekika gijutsu no kaihatsu seika gaiyo. Pilot plant ni yoru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-08-01

    This paper describes the achievements in 1991 on studies on the bituminous coal liquefaction technology using a pilot plant. Based on the detailed design of the 150-t/d pilot plant, study problems and analysis items were reviewed, and a material balance acquiring method and a reaction column data analyzing method were discussed. Utilization of the liquefaction simulator was attempted. Efficient execution of the pilot plant operation study requires to have the basic and support study achievements reflected on the pilot plant operation, and clarify the roles to be played by the groups. Therefore, discussion items were compiled. The overall process plan for the design and construction was reviewed based on the plan discussed in fiscal 1990. Fiscal 1991 has launched common civil engineering constructions. The operation plans for the main four facilities in the pilot plant, which have been prepared in fiscal 1988, were continued of reviewing to cope with the situation of the decreased construction budget. The budget was reviewed again in fiscal 1991, which would present a prospect of starting the operation in fiscal 1995. Annual reviews on the basic operation plans for the main four facilities and the conceptions taken to date were put into order. The project management system was also expanded and re-arranged, including the information registration and retrieval system. (NEDO)

  19. Fiscal 1995 achievement report. Development of entrained bed coal gasification power plant (Part 4 - Pilot plant operation); 1995 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 4. Pilot plant unten sosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The 200 tons/day entrained bed coal gasification pilot plant constructed for establishing the technology of integrated coal gasification combined cycle was subjected to operational tests, and the fiscal 1995 results are compiled. In fiscal 1995, 1328 hours and 3 minutes (8 gasification operations) was recorded with gasification furnace facility, 899 hours and 53 minutes with the gas clean-up facility, 831 hours and 27 minutes with the gas turbine facility (11 startups for the generation of 6657 MWh), and 1958 hours and 2 minutes with the treatment furnace and 1331 hours and 10 minutes with the denitration unit of the safety/environment-related facility. The details of starts and stops were described in graphs which covered Runs D13, D14-1, D14-2, E1, D15, and A14. Operating procedures were studied and compiled for the plant start/stop schedule, general guidelines, gasification furnace facility, gas clean-up facility (dry type desulfurization facility), gas clean-up facility (dry type dedusting facility), gas turbine facility, real-pressure natural-size combustor test facility, and the safety/environment-related facility. (NEDO)

  20. TASK 3: PILOT PLANT GASIFIER TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Fusselman, Steve

    2015-11-01

    Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. Design, fabrication and initial testing of the pilot plant compact gasifier was completed in 2011 by a development team led by AR. Findings from this initial test program, as well as subsequent gasifier design and pilot plant testing by AR, identified a number of technical aspects to address prior to advancing into a demonstration-scale gasifier design. Key among these were an evaluation of gasifier ability to handle thermal environments with highly reactive coals; ability to handle high ash content, high ash fusion temperature coals with reliable slag discharge; and to develop an understanding of residual properties pertaining to gasification kinetics as carbon conversion approaches 99%. The gasifier did demonstrate the ability to withstand the thermal environments of highly reactive Powder River Basin coal, while achieving high carbon conversion in < 0.15 seconds residence time. Continuous operation with the high ash fusion temperature Xinyuan coal was demonstrated in long duration testing, validating suitability of outlet design as well as downstream slag discharge systems. Surface area and porosity data were obtained for the Xinyuan and Xinjing coals for carbon conversion ranging from 85% to 97%, and showed a pronounced downward trend in surface area per unit mass carbon as conversion increased. Injector faceplate measurements showed no incremental loss of material over the course of these experiments, validating the commercially traceable design approach and supportive of long injector life goals. Hybrid testing of PRB and natural gas was successfully completed over a wide range of natural gas feed content, providing test data to anchor predictions

  1. FY 1991 report on the results of the development of an entrained bed coal gasification power plant. Part 4. Operation of pilot plant; 1991 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 4. Pilot plant unten sosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-01-01

    A record was summarized of the operation of the 200 t/d entrained bed coal gasification pilot plant that was constructed with the aim of establishing technology of the integrated coal gasification combined cycle power generation. As to the actual results of operation hours, the paper summarized the records of gasifier facilities, gas refining facilities, gas turbine facilities and safety environment facilities which were collected from April 1991 to January 1993. Relating to the actual results of start-up/stop, the paper summarized the records of gasifier facilities, gas refining facilities (desulfurization), gas refining facilities (dedusting), gas turbine facilities and safety environment facilities. Further, operation manuals were made for the schedule of plant start-up/stop, generalization, gasifier facilities, gas refining facilities (desulfurization), gas refining facilities (dedusting), gas turbine facilities, actual pressure/actual size combustor testing facilities and safety environment facilities. (NEDO)

  2. Report on results for fiscal 1997 (B edition) on development of coal liquefaction technology. Development of bituminous coal liquefaction technology (research by pilot plant) 1/2; 1997 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B ban). Rekiseitan ekika gijutsu no kaihatsu (pilot plant ni yoru kenkyu) 2/2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    This paper reports the operation of a pilot plant of a bituminous coal liquefaction technology as the 1/2 report. The operation research of the Run-2 through the Run-4-2 was conducted using, as the material, tanitoharum coal which is operating basis coal. The Run-2 achieved a coal charging continuous operation for 42 days. During the operation of 80% slurry supply load, various data were obtained including material balance under the NEDOL standard liquefaction conditions, with a liquefaction yield of 54% daf coal achieved. Steam blowing into the heating tube was found effective as measures to cope with coking generation in the heating furnace of a vacuum distillation tower. The softening point of liquefaction residuals was improved to 178 degrees C through the extracting adjustment of reduced pressure heavy gravity light oil fraction for washing. The Run-3/4-1 achieved a plant load ratio of 100% and a long-term coal charging continuous operation for 80 days, while the Run-3 achieved a slurry supply load of 100% under the NEDOL standard liquefaction conditions. The Run-4-1 achieved a high liquefaction yield of 58wt% daf coal. Performance was confirmed of a neutron beam source irradiation apparatus/measuring system and a tracer injection equipment. (NEDO)

  3. Fiscal 1994 achievement report. Development of entrained bed coal gasification power plant (Part 4 - Pilot plant operation); 1994 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 4. Pilot plant unten sosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The 200 tons/day entrained bed coal gasification pilot plant constructed for the establishment of the technology of integrated coal gasification combined cycle power generation was operated for testing, and the results are put together. Operating hours recorded were 1347 hours and 7 minutes for the gasification furnace facility (7 gasification operations), 752 hours and 22 minutes for the gas clean-up facilities, 425 hours and 20 minutes for the gas turbine facility (6 startups for generating 2616.1 MWh), and 1852 hours for the treatment furnace and 1304 hours and 32 minutes for the denitration system in the safety/environment-related facility. Detailed graphs were drawn for the description of starts and stops in Run D8, Run D9 (1-3), Run D10, Run D11, and in Run D12. Operating procedures were studied and then compiled for the plant start-stop schedule, general guidelines, gasification furnace facility, gas clean-up facility (dry type desulfurization facility), gas clean-up facility (dry type dedusting facility), gas turbine facility, real-pressure natural-size combustor test facility, and for the safety/environment related facility. (NEDO)

  4. Technical analysis of advanced wastewater-treatment systems for coal-gasification plants

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-31

    This analysis of advanced wastewater treatment systems for coal gasification plants highlights the three coal gasification demonstration plants proposed by the US Department of Energy: The Memphis Light, Gas and Water Division Industrial Fuel Gas Demonstration Plant, the Illinois Coal Gasification Group Pipeline Gas Demonstration Plant, and the CONOCO Pipeline Gas Demonstration Plant. Technical risks exist for coal gasification wastewater treatment systems, in general, and for the three DOE demonstration plants (as designed), in particular, because of key data gaps. The quantities and compositions of coal gasification wastewaters are not well known; the treatability of coal gasification wastewaters by various technologies has not been adequately studied; the dynamic interactions of sequential wastewater treatment processes and upstream wastewater sources has not been tested at demonstration scale. This report identifies key data gaps and recommends that demonstration-size and commercial-size plants be used for coal gasification wastewater treatment data base development. While certain advanced treatment technologies can benefit from additional bench-scale studies, bench-scale and pilot plant scale operations are not representative of commercial-size facility operation. It is recommended that coal gasification demonstration plants, and other commercial-size facilities that generate similar wastewaters, be used to test advanced wastewater treatment technologies during operation by using sidestreams or collected wastewater samples in addition to the plant's own primary treatment system. Advanced wastewater treatment processes are needed to degrade refractory organics and to concentrate and remove dissolved solids to allow for wastewater reuse. Further study of reverse osmosis, evaporation, electrodialysis, ozonation, activated carbon, and ultrafiltration should take place at bench-scale.

  5. Coal demonstration plants. Quarterly report, April--June 1977

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-01

    The objective of DOE's demonstration plant program is to establish the technical and financial feasibility of coal conversion technologies proven during pilot plant testing. Demonstration plants will minimize the technical and economic risks of commercialization by providing a near commercial size plant for testing and production. Thus, DOE is sponsoring the development of a series of demonstration plants, each of which will be a smaller version of commercial plants envisioned for the 1980's. These plants will be wholly integrated, self-sufficient in terms of heat generation, and dependent only on feedstock of coal, water, and air. Under the DOE program, contracts for designing, constructing, and operating the demonstration plants will be awarded through competitive procedures and will be jointly funded. The conceptual design phase will be funded by the government, with the detailed design, procurement, construction, and operation phases being co-funded, 50% from industry and 50% from the government. The cost involved in building and operating a demonstration plant will probably be between $200 million and $500 million, depending on the size of the plant. Six of these demonstration plant projects are described and progress in the quarter is summarized. Several support and complementary projects are described (fuel feeding system development, performance testing and comparative evaluation, engineering support, coal grinding equipment development and a critical components test facility). (LTN)

  6. FY 1992 report on the results of the development of an entrained bed coal gasification power plant. Part 3. Operation test of pilot plant (1/2); 1992 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant unten shiken hen (1/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-02-01

    The study of operation test was made of the 200 t/d entrained bed coal gasification pilot plant that was constructed with the aim of establishing technology of the integrated coal gasification combined cycle power generation, and the details of the FY 1992 results were summarized. At RUN 10, conducted were the confirmation of the quantity of state of gasifier in the coal-fired high load operation and coal-fired constant load operation, and slagging survey. At RUN 11, the evaluation made after the work for prevention of slagging, and confirmation of the quantity of state of gasifier at a load of 80% heat input. At RUN 12, the evaluation of the measures taken against slagging, and test on the high load stable operation. At RUN 13, the evaluation of the measures taken against slagging, and large combustor response/total pressure control response tests. At RUN D1, test on the change of coal kind from A coal to D coal, and test on the initial adjusting operation of D coal. In the trial operation of these, the following were generated and the preventive measures were studied: impossibility of circulation of desulfurizing agent in gas refining facilities (dry desulfurizing system), bolt fracture of gas refining facilities (separator of dedusting facilities). (NEDO)

  7. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Part 2. Fabrication/installation of pilot plant; 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Pilot plant seisaku suetsuke hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and the FY 1989 results were summarized. As to the gasifier equipment, fabrication of a considerable number of the main equipment was finished. And, the equipment was sent into the coal gasification power plant and the installation work was done. Concerning gas refining facilities, fabrication of most of the components of the dry desulfurization system was finished, and further, fabrication of part of the piping prefabrication, disk and part of the disk fitting instrument was finished. The partial equipment of the dry dust removal system was also fabricated. About gas turbine facilities, the drawings necessary for each of the equipment fabricated/installed in this fiscal year were made, and at the same time a part of the technical data prepared so far was reviewed according to the progress of design. As to safety environmental facilities, installation work was done of gas treatment furnace, gas cooling system, buffer tank, desulfurizing tower, etc. Besides, design/technical study were made of the total control system, equipment of the indoor switching station, etc. (NEDO)

  8. Development of technology for brown coal liquefaction. Design, construction and operation of pilot plant; development of 50t/d pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    1986-08-01

    As for the development of 50t/d pilot plant for the development of liquefaction plant of Victorian brown coal in Austraria, outline of the contents about the second stage construction following the first stage construction up to this time is reported from the following 4 viewpoints; 1: design of process apparatuses, 2: manufacture of apparatuses, 3: fieldwork of the construction and 4: operation of the first stage facilities. On the first item the outline of detail design made by Japanese and Australian companies is described. On the second item the acceptance of purchasing goods from Japan and Australia and the condition of inspection and quality assurance to specific principal parts are described. On the third item the supplementary construction of the first stage, contents of constructions of the second stage are described. On the fourth item, preparation for operation, target, the whole circumstances and the results of maintenance, especially review of operation technique, training of operators, and occurrence and repair of troubles are described. As other relevant works, envirommental assessment, waste disposal, enviromental monitoring for exhaust gases, drainage and working enviroments, safety measure, educational training and moreover activities for local district people and the state of labor market as the support for execution of the project are described.

  9. Achievement report for fiscal 1993 on developing entrained bed coal gasification power plant. Part 4. Pilot plant operation edition; 1993 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 4. Pilot plant unten sosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    Tests and researches have been carried out on operation of a 200-t/d entrained bed coal gasification pilot plant built with an objective of establishing the coal gasification composite power generation technology. This paper summarizes the operation achievements in fiscal 1993. The plant operation record in fiscal 1993 was as follows: 430 hours 27 minutes in the gasification furnace (ten gasification operations), 233 hours 51 minutes in the gas refining facility, 140 hours 31 minutes in the gas turbine facility (power generation amount of 746.8 MWh with nine actuations), 1,263 hours 09 minutes in the processing furnace in the safety environment facility, and 427 hours 22 minutes in the NOx removal equipment. Descriptions were given with detailed graphs on the actuation and shutdown record with respect to the run D2, the run D3 (1 and 2), the run D4, the run D5, the run D6, and the run D7 (1 through 4). The operation procedures were prepared for the plant startup and shutdown schedule, the generalization report, the gasification furnace facility, the gas refining facility (dry type desulfurizing facility), the gas refining facility (dry type dust removing facility), the gas turbine facility, the combustor testing facility with actual pressure and size, and the safety environment facilities. (NEDO)

  10. Comparison tests, in a pilot plant, of the performance of a coal-derived granular activated carbon: a comparison with coconut husk derived activated carbon

    Energy Technology Data Exchange (ETDEWEB)

    Hirata, S.; Kasahara, A.; Tsuruzono, Y.; Gotoh, M.

    1986-01-01

    A 160 m/sup 3//d pilot plant has been used in a series of comparison tests of the performance of coal-derived and coconut husk derived activated carbons. Activated carbons are used to remove trihalomethane precursors and malodorous substances from city water. A higher mean removal of coloration and COD/sub M//sub n/ was achieved with the coal-derived carbon (by factors of 1.5 and 1.8, respectively). The two activated carbons gave similar performances as regards turbidity, alkalinity, total iron and total manganese. 4 figures, 5 tables.

  11. Slipstream pilot-scale demonstration of a novel amine-based post-combustion technology for carbon dioxide capture from coal-fired power plant flue gas

    Energy Technology Data Exchange (ETDEWEB)

    Krishnamurthy, Krish R. [Linde LLC, Murray Hill, NJ (United States)

    2017-02-03

    Post-combustion CO2 capture (PCC) technology offers flexibility to treat the flue gas from both existing and new coal-fired power plants and can be applied to treat all or a portion of the flue gas. Solvent-based technologies are today the leading option for PCC from commercial coal-fired power plants as they have been applied in large-scale in other applications. Linde and BASF have been working together to develop and further improve a PCC process incorporating BASF’s novel aqueous amine-based solvent technology. This technology offers significant benefits compared to other solvent-based processes as it aims to reduce the regeneration energy requirements using novel solvents that are very stable under the coal-fired power plant feed gas conditions. BASF has developed the desired solvent based on the evaluation of a large number of candidates. In addition, long-term small pilot-scale testing of the BASF solvent has been performed on a lignite-fired flue gas. In coordination with BASF, Linde has evaluated a number of options for capital cost reduction in large engineered systems for solvent-based PCC technology. This report provides a summary of the work performed and results from a project supported by the US DOE (DE-FE0007453) for the pilot-scale demonstration of a Linde-BASF PCC technology using coal-fired power plant flue gas at a 1-1.5 MWe scale in Wilsonville, AL at the National Carbon Capture Center (NCCC). Following a project kick-off meeting in November 2011 and the conclusion of pilot plant design and engineering in February 2013, mechanical completion of the pilot plant was achieved in July 2014, and final commissioning activities were completed to enable start-up of operations in January 2015. Parametric tests were performed from January to December 2015 to determine optimal test conditions and evaluate process performance over a variety of operation parameters. A long-duration 1500-hour continuous test campaign was performed from May to

  12. Coal demonstration plants. Quarterly report, July--September 1977

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-02-01

    The objective of DOE's demonstration plant program is to establish the technical and financial feasibility of coal conversion technologies proven during pilot plant testing. Demonstration plants will minimize the technical and economic risks of commercialization by providing a near commercial size plant for testing and production. Thus, DOE is sponsoring the development of a series of demonstration plants, each of which will be a smaller version of commercial plants envisioned for the 1980's. These plants will be wholly integrated, self-sufficient in terms of heat generation, and dependent only on feedstock of coal, water, and air. Contracts for designing, constructing, and operating the demonstration plants will be awarded through competitive procedures and will be jointly funded. The conceptual design phase will be funded by the government, with the detailed design, procurement, construction, and operation phases being co-funded, 50% from industry and 50% from the government. The cost involved in building and operating a demonstration plant will probably be between $200 million and $500 million, depending on the size of the plant. Twenty-two projects involving demonstration plants or support projects for such plants are reviewed, including a summary for each of progress in the quarter. (LTN)

  13. Development of brown coal liquefaction. Design, construction and operation of a 50 t/d pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    1985-08-01

    As for the development of 50t/d pilot plant for the development of liquefaction plant of Victorian brown coal in Australia, outline of the results of the researches in 1984 is reported from the following 4 viewpoints; 1: design of process apparatuses, 2: manufacture of apparatuses, 3: field work of the construction, 4: preparation for operation of the plant. On the first item, the outline of ordering designed equipment from Japanese and Australian companies is described. On the second item the acceptance of purchasing goods from Japan and Australia and promotion of the inspection and quality assurance system. On the third item, contents of the continuous construction of the first stage are described. On the fourth item, the establishment and review of rules and regulations, training and education for operators, enviromental assessment, contents of safety and maintenance work and commissioning work by the promoting department for preparation of operation are described. Moreover support works of wide range for the promotion and adoption by necessary personnel, labour unions, the state of labour and activities for local discricts are described.

  14. Environmental Impacts Of Zirab Coal Washing Plant, Mazandaran, Iran

    Science.gov (United States)

    Moore, F.; Esmaeili, A.

    2009-04-01

    Extraction and beneficiation operations associated with coal mining increase the rate of chemical reaction of waste material to air and water media. Zirab coal washing plant is located on the bank of the Cherat stream in Mazandaran province, Iran. coal Mined from central Alborz coalfield mines is not suitable for use in Iranian Steel Corporation. Hence, coal ash content is reduced by physical and chemical processes in this plant. These processes leave a large quantity of liquid and solid wastes that accumulate in waste dump and tailing dam. sediment and water samples taken from Sheshrudbar and Cherat streams and also from Talar river show high concentration of Cd, Mo and As in water samples of coal washing plant and the associated drainage. Eh-pH diagrams revealed the chemical species of elements in water. The enrichment factor and geoaccumulation index show that Cd, Hg, Mo and V are enriched in bottom sediments of the coal washing plant and decrease with increasing distance from the plant. Sequential extraction analysis Results of three sediment samples of Cherat stream show that silicate bound is the major phase in samples taken before and after the plant, but adjacent to the plant, organic bound is dominant. The high concentration of Cd and Mo in the water soluble phase, is noticeable and may result in high mobility and bioavailability of these elements. Mann-Whitney and Wilcoxon tests on six samples, before and after the coal washing plant support the obtained results. Keywords: Zirab; coal washing plant; Sequential extraction analysis; Mann-whitney; Wilcoxon; Enrichment factor; Geoaccumulation index.

  15. FY 1992 report on the results of the development of an entrained bed coal gasification power plant. Part 4. Operation of pilot plant; 1992 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 4. Pilot plant unten sosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-02-01

    A record was summarized of the operation test study in FY 1992 of the 200 t/d entrained bed coal gasification pilot plant that was constructed with the aim of establishing technology of the integrated coal gasification combined cycle power generation. The operating hour of gasifier facilities in FY 1992 was 635 hours 19 minutes, and the number of times of gasification operation was 9. The operating hour of letting gas through to gas refining facilities was 549 hours 14 minutes. The operating hour of gas turbine facilities was 310 hours 18 minutes, and the generated output was 1,366.2 MWh. The operating hour of treatment furnace of safety environment facilities was 1,401 hours 4 minutes, and that of the denitrification system was 621 hours 24 minutes. As to the actual results of the start-up/stop, the paper detailedly recorded those of RUNs 10, 11, 12, 13 and D1. Further, operation manuals were made for the schedule of plant start-up/stop, gasifier facilities, gas refining facilities (dry desulfurization facilities), gas refining facilities (dry dedusting facilities), actual pressure/actual size combustor testing facilities and safety environment facilities. (NEDO)

  16. FY 1993 report on the results of the subsidy project for the Sunshine Project. Development of coal use hydrogen production technology (Support study of pilot plant - Study using the small equipment); 1993 nendo Sunshine keikaku hojo jigyo seika hokokusho. Sekitan riyo suiso seizo gijutsu kaihatsu - Pilot plant no shien kenkyu (Kogata souchi ni yoru kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    As to the development of coal use hydrogen production technology, the paper studied the reactivity of char and ignition characteristics of various coals in the use of electric furnace and the participation in pilot plant test and the improvement, and the FY 1993 results were reported. In the study of reactivity of char, it was found that the reactivity was the same, regardless of the equipment and kind of raw coal, if considered of the ratio of the total oxygen amount (the char-containing oxygen amount added to the oxygen supply amount) to the carbon supply amount in char. In the test on ignition characteristics of overseas coals, the same characteristics as those of the Taiheiyo coal conventionally tested were obtained and it was found that it was good to use the same method for start-up of gasifier as conventionally used. In the pilot plant test in the previous year, slag and ash stuck to the outlet of the gasification part and heat recovery part and developed, which hindered the continued operation. To improve it, the following were carried out: model study, study of ash sintering, study using the synthetic test equipment, analysis of the deposit in gasifier, etc. Based on these results, the plant was improved, and the continued operation of 1,149 hours was stably achieved in RUN8. (NEDO)

  17. Results of the DIOS pilot plant test and summary of the joint research; DIOS pilot plant no shiken sogyo kekka to kenkyu seika no matome

    Energy Technology Data Exchange (ETDEWEB)

    Sugiyama, T [Center for Coal Utilization, Japan, Tokyo (Japan); Kawaoka, K [The Japan Iron and Steel Federation, Tokyo (Japan)

    1996-09-01

    A joint research had been carried out with a subsidy from the Agency of Natural Resources and Energy since fiscal 1988 to fiscal 1995 on the direct iron ore smelting reduction process (DIOS process). The process utilizes coal directly as a process to use the strong points and supplement the weak points of the blast furnace process. During the period, a pilot plant had been operated since 1993. Upon having completed the feasibility study, this paper reports the result thereof. The main facilities consist of a smelting and reducing furnace of iron bath type, a spare reducing furnace of fluidized bed type, and a preheating furnace. The former two furnaces constitute a unit structure with the two furnaces connected vertically. The pilot plant achieved a three-day continuous operation producing 500 tons of iron every day. The production rate reached 21 tons an hour at an upward oxygen blowing velocity of about 13,000 Nm {sup 3} per hour. The coal unit requirement showed a result of <1000 kg/t for high VM coal and <900 kg/t for low VM coal. These results verified a possibility that this process can supplement or replace the blast furnace process even for a production scale of 9000 tons a day. 7 refs., 15 figs., 3 tabs.

  18. Fiscal 1995 achievement report. Development of entrained bed coal gasification power plant (Part 5 - Surveys and studies of demonstration plant); 1995 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 5. Jissho plant ni kansuru chosa kenkyu hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Surveys and studies were conducted concerning a demonstration plant for establishing the technology of integrated coal gasification combined cycle, and the fiscal 1995 results are compiled. In this fiscal year, a demonstration plant conceptual design was prepared for assuring smooth transition from a pilot plant to a commercial plant. The design followed the system employed at the Nakoso pilot plant for its gasification power generation. It was decided that the gasification furnace be of the air-blown (oxygen enriched) 2-stage entrained bed type, that the desulfurization system be of the dry type 2-stage fluidized bed type, the dedusting system be of the dry type granular bed type (moving bed type), that the combined cycle power facility be derived from the commercialized gas turbine, and that the cycle of the steam system agree with the integrated coal gasification combined cycle system now under discussion. Studies were made, which covered heat efficiency (generating end/sending end), heat/matter balance, process flow, gas turbine/steam system optimization, comparison in performance with a pilot plant with its dimensions increased, estimation of the performance of each of the facilities, estimation of the construction cost, calculation of the generation cost, environmental friendliness, operating characteristics, acceptable coal types, and the like. (NEDO)

  19. Report on results for fiscal 1997 (B edition) on development of coal liquefaction technology. Development of bituminous coal liquefaction technology (research by pilot plant) 1/2; 1997 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B gan). Rekiseitan ekika gijutsu no kaihatsu (pilot plant ni yoru kenkyu) 1/2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    Through the design, construction and operation of a pilot plant, the NEDOL method was verified, with its operation technology established, and also with a target set in collecting and accumulating data and knowledge required for a commercial plant in the future. With the Run-2, 3, 4 implemented using operating basis coal as the material, the operating stability of equipment/machines was confirmed, and a method of obtaining material balance as well as the operation technology was established, thereby demonstrating the NEDOL process, proving a long-term continuous operability and verifying the highest liquefaction yield. In addition, various process data, engineering data, operation control data, etc., were acquired, classified and analyzed. In the Run-3/4-1, a long-term coal charging continuous operation for 80 days was achieved, as was a high liquefaction yield of 58%. Moreover, data of material balance and thermal balance were obtained, with the performance confirmed of various kinds of equipment. Using the operating basis coat as the material, the coal charging operation of the Run-4-2 was commenced, with the performance verification test carried out for a neutron attenuation tracer method (NAT method), for the purpose of obtaining data of the flow characteristics of the liquefaction reaction tower. (NEDO)

  20. Fiscal 1995 achievement report. Development of entrained bed coal gasification power plant (Part 3 - Pilot plant operational test - 2/2); 1995 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant unten shiken hen (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The 200 tons/day entrained bed coal gasification pilot plant constructed for establishing the technology of integrated coal gasification combined cycle was subjected to operational tests, and the fiscal 1995 results are detailed. During Runs D13, D14, E1, D15, and A14 in the operational test of the gas clean-up facility (dry type dedusting facility), 10 troubles occurred, including damage of the separator screen, leak in the seal valve, and leak of the expansion gas, and measures were taken to deal with each of the troubles. The results of the gas turbine facility operational test were satisfactory, without any trouble worth discussion. In the operational test of the safety/environment-related facility, it was found that the produced gas was stably incinerated and that denitration performance during gas turbine operation roughly achieved the intended level. In the operational test of electric and control facilities, an overall test was conducted, inspection was made of the indoor switching facility, etc., and 13 improvements were made, which included the alteration of the high ANN setting in the water tank for slag, the alteration of the mill exit temperature setting for enabling the use of Taiheiyo coal, and proper methods for carrying out high-load operation. (NEDO)

  1. Corrosion behavior of Haynes registered 230 registered nickel-based super-alloys for integrated coal gasification combined cycle syngas plants. A plant exposure study

    International Nuclear Information System (INIS)

    Lee, Sungkyu; Lee, Jieun; Kang, Suk-Hwan; Lee, Seung-Jong; Yun, Yongseung; Kim, Min Jung

    2015-01-01

    The corrosion behavior of commercially available Haynes registered 230 registered nickel-based alloy samples was investigated by exposure to coal-gasifying integrated coal gasification combined cycle pilot plant facilities affiliated with the Institute for Advanced Engineering (2.005 MPa and 160-300 C). The morphological and microstructural analyses of the exposed samples were conducted using scanning electron microscopy and energy-dispersive X-ray spectroscopy analysis on the external surface of the recovered corrosion test samples to obtain information of the corrosion scale. These analyses based on the pre- and post-exposure corrosion test samples combined with thermodynamic Ellingham-Pourbaix stability diagrams provided preliminary insight into the mechanism of the observed corrosion behavior prevailing in the piping materials that connected the particulate removal unit and water scrubber of the integrated coal gasification combined cycle pilot plant. Uniform material wastage was observed after 46 hours of operation, and a preliminary corrosion mechanism was suggested: the observed material waste and corrosion behavior of the Haynes registered 230 registered nickel-based alloy samples cut off from the coal syngas integrated coal gasification combined cycle plant were explained by the formation of discontinuous (complex) oxide phases and subsequent chlorine-induced active oxidation under the predominantly reducing environment encountered. This contribution continues the already published studies of the Fe-Ni-Cr-Co alloy Haynes registered 556 registered .

  2. FY 1993 report on the results of the subsidy project for the Sunshine Project. Development of coal use hydrogen production technology (Support study of pilot plant - Trial development of materials of plant use equipment); 1993 nendo Sunshine keikaku hojo jigyo seika hokokusho. Sekitan riyo suiso seizo gijutsu kaihatsu - Pilot plant no shien kenkyu (Plant yo kiki zairyo no shisaku kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    As to the development of coal use hydrogen production technology, the paper made the test study on the improvement of gasifier use materials and evaluation of the characteristics, the evaluation test in the environment using the actual machine, etc., and the FY 1993 results were reported. The results of the study were as follows. Concerning the shaped refractory for gasifier hearth, it was found that high chromia base and picrochromite base refractory development materials had much more excellent coal slag resistance than other existing component-system materials. It was shown that the development materials began to deteriorate under the coal gasification environment at temperatures of about 1,500 degrees C or higher. As to the mullite ceramics, a possibility was shown of improving the slag permeation resistance by making the crystal grain coarse by long-time sintering. By the survey of the state of damage of the proposed materials (refractory and iridium) used in the operational environment of the pilot plant, the outlook for use limit was made clear. In the environment test using the actual machine on the proposed metal base alloy of the typical equipment of the pilot plant, the correspondence between the operational environment and material corrosion was made clear. (NEDO)

  3. FY 1991 report on the bituminous coal liquefaction section; 1991 nendo rekiseitan ekikabukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    The paper reported activities of the bituminous coal liquefaction section in FY 1991. In the 1st bituminous coal liquefaction section meeting, report/discussion were made on the outline of the plan on the FY 1991 research using pilot plant and the support study of pilot plant. In the 2nd section meeting, report was made on 'How the development of coal liquefaction technology should be in the 21st century,' a report made by the joint section of bituminous coal/brown coal liquefaction. In the 3rd section meeting, report/discussion were made on the state of progress of the FY 1991 R and D and results. In the study using the bituminous coal liquefaction pilot plant, report was made on the outline of construction of a 150t/d pilot plant, study on the acquisition of material balance, analytical study of the data on liquefaction tower, testing survey on properties of coal slurry, and testing survey on slurry preheating furnace. In the support study of pilot plant, report was made on the study using 1t/d PUS, study on the development of the optimum coal refining technology and improvement in the distillate distribution, study of conditions for coal liquefaction and study of solvent hydrogenation catalyst. (NEDO)

  4. Report on the achievements in development of a coal liquefaction technology (a solvent extraction and liquefaction technology) in the Sunshine Project in fiscal 1981. Data 1. Development of a brown coal based solvent extraction plant (50 t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (shiryo 1). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    This paper describes the data-1 for developing a brown coal based solvent extraction plant in the Sunshine Project in fiscal 1981. The data are for the development of a liquefaction plant for Victoria brown coal produced in Australia (a 50-t/d pilot plant). Fiscal 1981 has performed detailed design on the primary hydrogenation system by using the process conception and the design data obtained in the element studies. Part of the machines and devices was procured, and the site construction was begun. Detailed design documents and drawings were prepared. The data collected in relation with the plant design included the followings: device lists, entire factory layout drawings, device arrangement drawings, process flow sheets, utility flow sheets (fuel gas and fuel oil systems, steam and condensate systems, air for instrumentation, plant air, cooling water supply and return, industrial water and treated water, a waste water treatment system, a nitrogen system, and a waste gas system), public pollution preventing facilities, hazardous location classifying plans, and material balances. The data collected in relation with the machine design included pressure vessel engineering specifications, heat exchanger engineering specifications, and device purchase specifications. (NEDO)

  5. Achievement report for fiscal 1981 on Sunshine Program-assisted project. Data 4. Development of coal liquefaction technology/Development of solvent extraction liquefaction technology/Development of brown coal solvent extraction plant (Development of 50t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (Shiryo 4). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Research is conducted for the development of a liquefaction plant (50t/d pilot plant) for Australia's Victorian brown coal. In fiscal 1981, using the process concept and design data obtained through the study of elements, a detailed design of a primary hydrogenation system is drawn, part of the equipment is procured, and on-site construction work is started. The book is a collection of materials which include instrumentation-related drawings covering an instrumentation loop sketch, instrument inspection specifications (flow meter, level gage, pressure gage, thermometer, regulation meter, analyzing meter, signal receiving meter, and instrument board), general specifications for electrical instrumentation facilities, etc. (NEDO)

  6. Achievement report for fiscal 1981 on Sunshine Program-assisted project. Data 4. Development of coal liquefaction technology/Development of solvent extraction liquefaction technology/Development of brown coal solvent extraction plant (Development of 50t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (Shiryo 4). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Research is conducted for the development of a liquefaction plant (50t/d pilot plant) for Australia's Victorian brown coal. In fiscal 1981, using the process concept and design data obtained through the study of elements, a detailed design of a primary hydrogenation system is drawn, part of the equipment is procured, and on-site construction work is started. The book is a collection of materials which include instrumentation-related drawings covering an instrumentation loop sketch, instrument inspection specifications (flow meter, level gage, pressure gage, thermometer, regulation meter, analyzing meter, signal receiving meter, and instrument board), general specifications for electrical instrumentation facilities, etc. (NEDO)

  7. Japan`s sunshine project. 17.. 1992 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This report describes the achievement of coal liquefaction and gasification technology development in the Sunshine Project for FY 1992. It presents the research and development of coal liquefaction which includes studies on reaction mechanism of coal liquefaction and catalysts for coal liquefaction, the research and development of coal gasification technologies which includes studies on gasification characteristics of various coals and improvement of coal gasification efficiency, the development of bituminous coal liquefaction which includes engineering, construction and operation of a bituminous coal liquefaction pilot plant and research by a process supporting unit (PSU), the development of brown coal liquefaction which includes research on brown coal liquefaction with a pilot plant and development of techniques for upgrading coal oil from brown coal, the development of common base technologies which includes development of slurry letdown valves and study on upgrading technology of coal-derived distillates, the development of coal-based hydrogen production technology with a pilot plant, the development of technology for entrained flow coal gasification, the assessment of coal hydrogasification, and the international co-operation. 4 refs., 125 figs., 39 tabs.

  8. FY 1994 report on the results of the project supplementary to the New Sunshine Project - Development of the coal utilization hydrogen production technology. Ninth year - Part 2. Study using a pilot plant (Design/construction/operation study of the pilot plant and the dismantling study); 1994 nendo New Sunshine keikaku hojo jigyo Dai 9 nenji bun seika hokokusho - 2. Sekitan riyo suiso seizo gijutsu kaihatsu - Pilot plant ni yoru kenkyu (Pilot plant no sekkei kensetsu unten kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    In the R and D of the high temperature coal gasification technology by the entrained bed system which is the core technology of the coal utilization hydrogen production technology, the paper carried out the dismantling study of pilot plant and the summarization of the results. About the summarization of the results, as the results of the HYCOL operation study, there were insufficiencies in expansion of the coal kind used and acquisition of scale-up data, but it was verified that the conceptual design of the HYCOL method was fully applicable to the higher gasification efficiency, higher reliability, adaptability to many kinds of coal and compactness of facilities (low construction cost) which were the final subjects for the realization of commercial plant. This was highly evaluated. Especially, the greatest characteristic of the HYCOL method is the freedom in selection of temperature difference between the upper stage and lower stage, that is, temperatures can be controlled to temperatures they want in each of the upper stage and lower stage in the one-chamber gasifier according to coal properties and slagging control. The verification of this freedom was the base of the total results. Moreover, a reputation was being made that the gasification efficiency and process reliability are at the world's highest level. (NEDO)

  9. FY 1991 report on the results of the development of the entrained bed coal gasification power plant. Part 1. Element study/investigational study of technology/study of the integrated coal gasification combined cycle power system; 1991 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 1. Youso kenkyu hen, gijutsu chosa hen, sekitan gaska fukugo hatsuden system kento hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-01-01

    For the purpose of establishing the technology of integrated coal gasification combined cycle power generation, the following were conducted: element study of a 200t/d entrained bed coal gasification pilot plant, survey of technology of the coal gasification power generation, study of the practical scale IGCC, etc. The FY 1991 results were summarized. In the gasification test using 2t/d furnace equipment, evaluation test on the test coal for pilot plant was made. In the study of gas turbine combustor for demonstration machine use, measuring duct was fabricated for measurement of combustion gas temperature/pressure, etc. In the simulational study of the total system of combined cycle power generation, review/modification of part of the simulation model and detailing of the model were conducted by comparison with the data on pilot plant operation. In the technology study, joint technology conferences were held for discussions between Japan and Australia, Japan and the U.S., and Japan and Canada. As to the practical scale IGCC, the initially planned output capacity and thermal efficiency were studied based on the knowledge/information obtained through the R and D on the 200t/d pilot plant. (NEDO)

  10. Extractive metalurgical pilot plant. Project and installation

    International Nuclear Information System (INIS)

    Paula, H.C.B.; Rolim, T.L.; Santana, A.O. de; Santos, F.S.M. dos; Dantas, C.C.

    1986-01-01

    An extractive metalurgical pilot plant with a flow capacity of 200l/h of phosphoric leach, recovering 80% of the uranium content has been designed and installed. Starting from the diagrams of the chemical process in the laboratory scale, the equipment worksheet of the basic project were developed. The procedure for dimensioning and positioning of each component is described. An isometric figure and the pilot plant lay-out are included. The pilot plant occupying 41 m 2 has been tested and operates at its nominal capacity. (author) [pt

  11. Corrosion behavior of Haynes {sup registered} 230 {sup registered} nickel-based super-alloys for integrated coal gasification combined cycle syngas plants. A plant exposure study

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sungkyu; Lee, Jieun; Kang, Suk-Hwan; Lee, Seung-Jong; Yun, Yongseung [Institute for Advanced Engineering (IAE), Gyeonggi-do (Korea, Republic of). Plant Engineering Center; Kim, Min Jung [Sungkyunkwan Univ, Gyeonggi-do (Korea, Republic of). Advanced Materials Technology Research Center

    2015-07-01

    The corrosion behavior of commercially available Haynes {sup registered} 230 {sup registered} nickel-based alloy samples was investigated by exposure to coal-gasifying integrated coal gasification combined cycle pilot plant facilities affiliated with the Institute for Advanced Engineering (2.005 MPa and 160-300 C). The morphological and microstructural analyses of the exposed samples were conducted using scanning electron microscopy and energy-dispersive X-ray spectroscopy analysis on the external surface of the recovered corrosion test samples to obtain information of the corrosion scale. These analyses based on the pre- and post-exposure corrosion test samples combined with thermodynamic Ellingham-Pourbaix stability diagrams provided preliminary insight into the mechanism of the observed corrosion behavior prevailing in the piping materials that connected the particulate removal unit and water scrubber of the integrated coal gasification combined cycle pilot plant. Uniform material wastage was observed after 46 hours of operation, and a preliminary corrosion mechanism was suggested: the observed material waste and corrosion behavior of the Haynes {sup registered} 230 {sup registered} nickel-based alloy samples cut off from the coal syngas integrated coal gasification combined cycle plant were explained by the formation of discontinuous (complex) oxide phases and subsequent chlorine-induced active oxidation under the predominantly reducing environment encountered. This contribution continues the already published studies of the Fe-Ni-Cr-Co alloy Haynes {sup registered} 556 {sup registered}.

  12. Report on the results of the R and D of a 200 t/d entrained bed coal gasification pilot plant. Summary - Part 2. Volume 3: Results of the study operation and the evaluation; 1986- 200t/nichi funryusho sekitan gaska hatsuden pilot plant no kenkyu seika hokokusho (Matome). Sono 2. Dai 3 hen kenkyu unten seika to sono hyoka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    A project was finished which had been carried out for 11 years since 1986 for technology of the entrained bed coal gasification power generation technology using a 200 t/d coal gasification combined cycle power generation pilot plant, and it was comprehensively summed up. In Volume 3: Results of the study operation and the evaluation, the following were summarized on gasifier: gasification performance of 200 t/d furnace, operation ability of the bituminous coal supply system, stability of char recovery, deposition of slag and char in furnace, discharge characteristics of molten slag, operation characteristics, etc. The following on gas refining facilities: dry desulfurizer, dust remover, new gas refining equipment (fixed bed dust removal/desulfurization system, packed bed desulfuriztion/dust removal system), etc. The following on gas turbine facilities: 12.5 MW gas turbine, large gas turbine, large gas turbine combustor, etc. Additionally, the paper summarized the control system and total function, operation characteristics of the whole pilot plant, relations of environmental preservation, study of the effective slag utilization, collection/study of unfavorable conditions/troubles and matters for the reflection, etc. (NEDO)

  13. Capital cost: high and low sulfur coal plants-1200 MWe. [High sulfur coal

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    This Commercial Electric Power Cost Study for 1200 MWe (Nominal) high and low sulfur coal plants consists of three volumes. The high sulfur coal plant is described in Volumes I and II, while Volume III describes the low sulfur coal plant. The design basis and cost estimate for the 1232 MWe high sulfur coal plant is presented in Volume I, and the drawings, equipment list and site description are contained in Volume II. The reference design includes a lime flue gas desulfurization system. A regenerative sulfur dioxide removal system using magnesium oxide is also presented as an alternate in Section 7 Volume II. The design basis, drawings and summary cost estimate for a 1243 MWe low sulfur coal plant are presented in Volume III. This information was developed by redesigning the high sulfur coal plant for burning low sulfur sub-bituminous coal. These coal plants utilize a mechanical draft (wet) cooling tower system for condenser heat removal. Costs of alternate cooling systems are provided in Report No. 7 in this series of studies of costs of commercial electrical power plants.

  14. Japan's New Sunshine Project. 1994 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This paper summarizes the report for fiscal 1994 on research and development related to coal liquefaction and gasification. In the research and development of coal liquefaction technologies, reports were given on research of liquefaction characteristics of different coals and liquefaction process thereof, and on research of catalysts for the coal liquefaction. In the research and development of coal gasification technologies, reports were given on fundamental studies on gasification characteristics of different coals. In the research and development of liquefaction technologies for bituminous coal, reports were given on design, construction and operation of a bituminous coal liquefaction pilot plant with a capacity of 150 t/d, and the operation supporting studies on the pilot plant. In the fundamental research on the coal liquefaction process, reports were given on refining technologies and utilization of the refined materials, and studies on environment preservation in applying the coal liquefaction technologies. In the research on hydrogen manufacturing technologies by using the fundamental coal technology, reports were given on design, construction and operational studies of a pilot plant. In the research and development of the coal gasification technologies, reports were given on development of a jet-flow gasified coal electric power plant, selection of coals, and development of a data processing system. (NEDO)

  15. The world behind electricity from coal. The dubious origin of coal for Dutch coal-fired power plants

    International Nuclear Information System (INIS)

    2008-01-01

    Five energy companies in the Netherlands want to build additional coal-fired power plants: Essent and Nuon, the German company RWE and E.ON and the Belgian company Electrabel. Coal-fired power plants emit 70 percent more CO2 than gas-fired power plants. Especially because of the threat to the climate Greenpeace believes that no more coal-fired power plants should be built. In this publication Greenpeace explores the pollution, the working conditions and human rights with regard to the exploitation of coal. That has been elaborated for the three countries from which Dutch energy companies import coal: South Africa, Colombia and Indonesia. In addition to information about the origin of coal also insight is given into the coal market (stocks and use), the enormous coal transport and the world trade [nl

  16. FY 1992 report on the results of the development of an entrained bed coal gasification power plant. Part 3. Operation test of pilot plant (2/2); 1992 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant unten shiken hen (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-02-01

    The study of operation test was made of the 200 t/d entrained bed coal gasification pilot plant that was constructed with the aim of establishing technology of the integrated coal gasification combined cycle power generation, and the details of the FY 1992 results were summarized. As to the test of gas turbine facilities, at RUN 10, the scheduled test on coal gas mixed combustion continuous operation/coal gas fired operation was not carried out because of the worsening of the state of gasifier operation. The operation was just made for a short time. At RUN 11, it was confirmed that the motion of equipment in the bleeding system was good at the time of the bleeding cooperation test and there was no anomaly also in the state of gas turbine operation. At RUN 12, it was confirmed that the motion of load/pressure control functions was normal in the state of GT load of about 5MW. At RUN 13, it was confirmed that the control function of GT governor was confirmed in the total pressure control test. As a result of the operation test of these, items of improvement were extracted for actual pressure/actual size combustor facilities, safety environment facilities and electric/control facilities. The measures taken for each item were studied. (NEDO)

  17. Biodesulphurisation of high sulphur coal by heap leaching

    Energy Technology Data Exchange (ETDEWEB)

    J. Cara; M.T. Carballo; A. Moran; D. Bonilla; O. Escolano; F.J. Garcia Frutos [Universidad de Leon, Leon (Spain). Departamento de Ingenieria Quimica

    2005-10-01

    The biodesulphurisation of coal carried out in pile could be an interesting option to clean coal. In view of the good results obtained in biodesulphurisation test column at lab scale on a sample of semianthracite coal that proceed of an industrial plant with a high sulphur content, mainly pyritic sulphur, the feasibility of the process at pilot plant scale was studied. The pile was formed with 6 ton of gravity middlings coal sample with a grain size -12+0.5 mm from S.A. Hullera Vasco-Leonesa industrial plant. The coal has a total sulphur content of 3.78% and a pyritic sulphur content of 2.88%, the rest of sulphur is organic sulphur. The biodesulphurisation process in pilot plant follows three stages: stabilization of the pile, biodesulphurisation and washing. Heap was sampled twice during stabilisation stage, at the end of desulphurisation process and finally once washed. A pyritic sulphur removal of 39% and total sulphur removal of 23% was obtained. To complete the bioleaching process, the treatment of purge of leachate was carried out with the objective to recycling to head of process. The best treatment was a pre-treatment of the leachate until pH 4, and further treatment by reverse osmosis of the clarified water. Comparing this process with conventional precipitation to reach disposal limits, the reagents consumption and sludges were reduced considerably and due to the high quality of permeate it permits to recycle it to head of process. 18 refs., 6 figs., 6 tabs.

  18. KINETICS OF DIRECT OXIDATION OF H2S IN COAL GAS TO ELEMENTAL SULFUR; F

    International Nuclear Information System (INIS)

    K.C. Kwon

    2002-01-01

    Removal of hydrogen sulfide (H(sub 2)S) from coal gasifier gas and sulfur recovery are key steps in the development of Department of Energy's (DOE's) advanced Vision 21 plants that employ coal and natural gas and produce electric power and clean transportation fuels. These Vision 21 plants will require highly clean coal gas with H(sub 2)S below 1 ppm and negligible amounts of trace contaminants such as hydrogen chloride, ammonia, alkali, heavy metals, and particulate. The conventional method of sulfur removal and recovery employing amine, Claus, and tail-gas treatment is very expensive. A second generation approach developed under DOE's sponsorship employs hot-gas desulfurization (HGD) using regenerable metal oxide sorbents followed by Direct Sulfur Recovery Process (DSRP). However, this process sequence does not remove trace contaminants and is targeted primarily towards the development of advanced integrated gasification combined cycle (IGCC) plants that produce electricity (not both electricity and transportation fuels). There is an immediate as well as long-term need for the development of cleanup processes that produce highly clean coal gas for next generation Vision 21 plants. To this end, a novel process is now under development at Research Triangle Institute (RTI) in which the H(sub 2)S in coal gas is directly oxidized to elemental sulfur over a selective catalyst. Such a process is ideally suited for coal gas from commercial gasifiers with a quench system to remove essentially all the trace contaminants except H(sub 2)S. This direct oxidation process has the potential to produce a super clean coal gas more economically than both conventional amine-based processes and HGD/DSRP. The objective of this research is to support the near- and long-term DOE efforts to commercialize this direct oxidation technology. Specifically, we aim to: Measure the kinetics of direct oxidation of H(sub 2)S to elemental sulfur over selective catalysts in the presence of major

  19. Partial gasification of coal in a fluidized bed reactor: Comparison of a laboratory and pilot scale reactors

    Energy Technology Data Exchange (ETDEWEB)

    Xiao, R.; Shen, L.H.; Zhang, M.Y.; Jin, B.S.; Xiong, Y.Q.; Duan, Y.F.; Zhong, Z.P.; Zhou, H.C.; Chen, X.P.; Huang, Y.J. [Southeast University, Nanjing (China)

    2007-01-15

    A 0.1 MWth lab-scale and 2 MWth pilot-scale experimental rigs were constructed to demonstrate the technical feasibility of a new process. The aim of the lab-scale study is to optimize coal partial gasification reactions operating conditions, which were applied in the pilot-scale tests. A comparison between the laboratory and pilot scale experimental results is presented in this paper in order to provide valuable information for scaling-up of the PFB coal partial reactor to industrial applications. The results show that trends and phenomena obtained in the laboratory reactor are confirmed in a pilot plant operating at similar conditions. However, many differences are observed in the two reactors. The higher heat loss in the lab-scale reactor is responsible for higher equivalence ratio (ER) and lower gas heating value at the similar reactor temperature. With respect to the pilot-scale reactor, mass transfer limitation between bubbles and emulsion phase may become important. Hence, longer contact time is required to achieve the same conversions as in the lab-scale reactor. This difference is explained by a significant change of the hydrodynamic conditions due to the formation of larger bubbles.

  20. Report on the results of the R and D of a 200 t/d entrained bed coal gasification pilot plant. Summary - Part 1. Volume 1: Outline of the R and D/Volume 2: Outline of the details of execution of the R and D/Investigational study of verification plant; 1986- 200t/nichi funryusho sekitan gaska hatsuden pilot plant no kenkyu seika hokokusho (Matome). Sono 1. Dai 1 hen kenkyu kaihatsu no gaiyo, Dai 2 hen kenkyu kaihatsu jisshi keii no gaiyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    A project was finished which had been carried out for 11 years since 1986 for technology of the entrained bed coal gasification power generation technology using a 200 t/d coal gasification combined cycle power generation pilot plant, and it was comprehensively summed up. In Volume 1: Outline of the R and D, the following were summarized: object and background, details of selection of the basic system, objectives and subjects of the R and D, developmental items of 200 t/d pilot plant, outline of pilot plant, place of execution of the R and D and system of the R and D, response to procedures for approval from government offices, etc. In Volume 2: Outline of the details of execution of the R and D, state of design/manufacture/construction, state of operational study, state of dismantling study, important notice at the time of design of pilot plant and the evaluation, outline of the execution of element study, outline of the details of the studies made public overseas. In Investigational study of verification plant, the basic viewpoint of conceptual design, conditions for conceptual design/basic design, outline of the results of the study every fiscal year, finally obtained results of the conceptual design, points to be considered in the design of verification plant, etc. (NEDO)

  1. Hazards from radioactivity of fly ash of Greek coal power plants (CPP)

    International Nuclear Information System (INIS)

    Papastefanou, C.; Charalambous, S.

    1980-01-01

    Fly ash and fine dispersion releases from coal combustion in Greek coal power plants were studied. Concentrations in the fly ash up to 20 pCi/g and 10 pCi/g were measured for 238 U and 226 Ra respectively (not in secular equilibrium). Risk from the fly ash derives from its escape in particulate form or fine dispersion and from its use as a substitute for cement in concrete. The new data indicate that coal power plants discharge relatively larger quantities of radioactive material into the atmosphere than nuclear power plants of comparable size, during normal operation. (H.K.)

  2. Solvent Refined Coal (SRC) process: trace elements. Research and development report No. 53, interim report No. 30. Volume III. Pilot plant development work. Part 6. The fate of trace elements in the SRC process

    International Nuclear Information System (INIS)

    Khalil, S.R.

    1980-02-01

    Instrumental neutron activation analysis was used to study the distribution and fate of up to 36 elements in the Solvent Refined Coal Process Pilot Plant located at Fort Lewis, Washington. The elements Ti, V, Mg, Ca, Al, Cl, Mn, As, Br, Na, K, Sm, La, Ga, Cu, Sb, Se, Hg, Ni, Co, Cr, Fe, Rb, Cs, Sc, Tb, Eu, Ce, Sr, Ba, Th, U, Hf, Ta, Zr and Zn were measured in feed coal, insoluble residues, process solvent, process and effluent waters, by-product sulfur, SRC-I solid product, liquid-liquid separator oils and SRC-II liquid products. The material balance was calculated for each element from the concentration data and yields of each process fraction for both the SRC-I and SRC-II processes. Except for Ti, Cl and Br in the SRC-I mode and Hg in the SRC-II mode, each element was substantially lower in the SRC products than in the original feed coal. Residues from the process contained more than 80% of the trace element content found in the coal, except for Hg. More than 98.5% of the total contents of K and Fe in coal were retained in the insoluble residues. Elements such as Hg, Se, As and Sb can form volatile compounds (such as Hg 0 , H 2 Se, AsH 3 and SbH 3 ) stable under the process conditions. The high enhancement factors of Se (957), As (202) and Sb (27.4) in the aqueous phase of the separator water compared to that of the oil are evidence for the formation of volatile species which are more soluble in water than in the oil phase

  3. Refining and end use study of coal liquids II - linear programming analysis

    Energy Technology Data Exchange (ETDEWEB)

    Lowe, C.; Tam, S.

    1995-12-31

    A DOE-funded study is underway to determine the optimum refinery processing schemes for producing transportation fuels that will meet CAAA regulations from direct and indirect coal liquids. The study consists of three major parts: pilot plant testing of critical upgrading processes, linear programming analysis of different processing schemes, and engine emission testing of final products. Currently, fractions of a direct coal liquid produced form bituminous coal are being tested in sequence of pilot plant upgrading processes. This work is discussed in a separate paper. The linear programming model, which is the subject of this paper, has been completed for the petroleum refinery and is being modified to handle coal liquids based on the pilot plant test results. Preliminary coal liquid evaluation studies indicate that, if a refinery expansion scenario is adopted, then the marginal value of the coal liquid (over the base petroleum crude) is $3-4/bbl.

  4. Development of coal energy utilization technologies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    Coal liquefaction produces new and clean energy by performing hydrogenation, decomposition and liquefaction on coal under high temperatures and pressures. NEDO has been developing bituminous coal liquefaction technologies by using a 150-t/d pilot plant. It has also developed quality improving and utilization technologies for liquefied coal, whose practical use is expected. For developing coal gasification technologies, construction is in progress for a 200-t/d pilot plant for spouted bed gasification power generation. NEDO intends to develop coal gasification composite cycle power generation with high efficiency and of environment harmonious type. This paper summarizes the results obtained during fiscal 1994. It also dwells on technologies to manufacture hydrogen from coal. It further describes development of technologies to manufacture methane and substituting natural gas (SNG) by hydrogenating and gasifying coal. The ARCH process can select three operation modes depending on which of SNG yield, thermal efficiency or BTX yield is targeted. With respect to promotion of coal utilization technologies, description is given on surveys on development of next generation technologies for coal utilization, and clean coal technology promotion projects. International coal utilization and application projects are also described. 9 figs., 3 tabs.

  5. Coal gasification. Quarterly report, April--June 1977

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-01

    The conversion of coal to high-Btu gas requires a chemical and physical transformation of solid coal. However, because coal has widely differing chemical and physical properties, depending on where it is mined, it is difficult to process. Therefore, to develop the most suitable techniques for gasifying coal, ERDA, together with the American Gas Association, is sponsoring the development of several advanced conversion processes. Although the basic coal-gasification chemical reactions are the same for each process, the processes under development have unique characteristics. A number of the processes for converting coal to high Btu and to low Btu gas have reached the pilot plant stage. The responsibility for designing, constructing and operating each of these pilot plants is defined and progress on each during the quarter is described briefly. The accumulation of data for a coal gasification manual and the development of mathematical models of coal gasification processes are reported briefly. (LTN)

  6. Japan's New Sunshine Project. 1994 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This paper summarizes the report for fiscal 1994 on research and development related to coal liquefaction and gasification. In the research and development of coal liquefaction technologies, reports were given on research of liquefaction characteristics of different coals and liquefaction process thereof, and on research of catalysts for the coal liquefaction. In the research and development of coal gasification technologies, reports were given on fundamental studies on gasification characteristics of different coals. In the research and development of liquefaction technologies for bituminous coal, reports were given on design, construction and operation of a bituminous coal liquefaction pilot plant with a capacity of 150 t/d, and the operation supporting studies on the pilot plant. In the fundamental research on the coal liquefaction process, reports were given on refining technologies and utilization of the refined materials, and studies on environment preservation in applying the coal liquefaction technologies. In the research on hydrogen manufacturing technologies by using the fundamental coal technology, reports were given on design, construction and operational studies of a pilot plant. In the research and development of the coal gasification technologies, reports were given on development of a jet-flow gasified coal electric power plant, selection of coals, and development of a data processing system. (NEDO)

  7. Pilot-scale test for electron beam purification of flue gas from coal-combustion boiler

    International Nuclear Information System (INIS)

    Namba, Hideki; Tokunaga, Okihiro; Hashimoto, Shoji; Doi, Yoshitaka; Aoki, Shinji; Izutsu, Masahiro

    1995-01-01

    A pilot-scale test for electron beam treatment of flue gas (12,000m 3 N/hr) from coal-fired boiler was conducted by Japan Atomic Energy Research Institute, Chubu Electric Power Company and Ebara Corporation, in the site of Shin-Nagoya Thermal Power Plant in Nagoya, Japan. During 14 months operation, it was proved that the method is possible to remove SO 2 and NO x simultaneously in wide concentration range of SO 2 (250-2,000ppm) and NO x (140-240ppm) with higher efficiency than the conventional methods, with appropriate operation conditions (dose, temperature etc.). The pilot plant was easily operated with well controllability and durability, and was operated for long period of time without serious problems. The byproduct, ammonium sulfate and ammonium nitrate, produced by the treatment was proved to be a nitrogenous fertilizer with excellent quality. (author)

  8. Fiscal 1990 report on the bituminous coal liquefaction section meeting; 1990 nendo rekiseitan ekika bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    At the 1st, 2nd, and 3rd group meetings held for the fiscal year, reports are delivered and discussions are made concerning the progress of research and development activities. Reported and discussed in relation to the pilot plant support research, etc., are studies with the 1t/d PSU (process supporting unit) (Nippon Steel Corporation, Mitsui Coal Liquefaction Co., Ltd., and Japan Coal Oil Co., Ltd.); development of an optimum coal refining technique (Sumitomo Coal Mining Co., Ltd.); development of an optimum pretreatment technique and improvement on distillate distribution (Sumitomo Metal Industries, Ltd.); studies of coal liquefaction conditions (Mitsui Engineering and Shipbuilding Co., Ltd.); and studies of solvent hydrogenation catalysts (Sumitomo Metal Mining Co., Ltd., and Chiyoda Corp.). Reported and discussed in relation to researches using a bituminous coal liquefaction pilot plant are the progress of the 150t/d PP (pilot plant) effort (Japan Coal Oil Co., Ltd.) and the outlines of pilot surveys (Japan Coal Oil Co., Ltd.), the latter covering liquefaction solvent performance optimization, slurry pre-heating furnaces, coal slurry properties, and so forth. (NEDO)

  9. Development of clean coal and clean soil technologies using advanced agglomeration techniques

    International Nuclear Information System (INIS)

    Ignasiak, B.; Ignasiak, T.; Szymocha, K.

    1990-01-01

    Three major topics are discussed in this report: (1) Upgrading of Low Rank Coals by the Agflotherm Process. Test data, procedures, equipment, etc., are described for co-upgrading of subbituminous coals and heavy oil; (2) Upgrading of Bituminous Coals by the Agflotherm Process. Experimental procedures and data, bench and pilot scale equipments, etc., for beneficiating bituminous coals are described; (3) Soil Clean-up and Hydrocarbon Waste Treatment Process. Batch and pilot plant tests are described for soil contaminated by tar refuse from manufactured gas plant sites. (VC)

  10. Natural radioactivity level in coal and ash collected from Baoji coal-fired power plant

    International Nuclear Information System (INIS)

    Jia Xiaodan; Lu Xinwei

    2006-01-01

    Specific activities of natural radionuclides 226 Ra, 232 Th and 40 K were assessed in coal (3 samples), fly ash (17 samples) and bottom ash (6 samples) collected from Baoji coal-fired power plant. This paper analyzed the characteristics of 226 Ra, 232 Th and 40 K contents in bottom ash and fly ash, and studied the concentration factors of these radionuclides in ash in relation to those in coal. The level of natural radionuclides 226 Ra, 232 Th and 40 K of coal collected from Baoji coal-fired power plant are in the range of radionuclides contents of Chinese coal. The natural radioactivity level of fly ash collected from Baoji coal-fired power plant is close to Beijing and Shanghai coal-fired power plants. The paper farther assessed the possibility of fly ash of Baoji coal-fired power plant used as building materials according to the state standard. The results show that there are 29% samples exceeding the state limit when fly ash used as building materials. So the usage of fly ash in building material should be controlled. (authors)

  11. Improvement in water-slurry circulation at the Chumakovskaya coal preparation plant

    Energy Technology Data Exchange (ETDEWEB)

    Nabokov, A.K.; Fedotov, B.P.; Mitlash, V.V.

    1988-02-01

    The Chumakovskaya coal preparation plant (Donetskugleobogashchenie association) was put into operation in 1935. It processes 570 t/h of coal slurry with an ash content of 38.6% and produces grade T coal for coking and power generation. Coal preparation technology used is described. Shortcomings of the system cause 130 kg of high ash slurries to be recirculated per m/sup 3/ of hydrocyclone drain. Mathematical analysis of the present process and of two improved variants is presented. The analysis permits variants for clarification of the recirculated water to be developed and evaluated and the best one to be selected. The optimum variant permits the amount of thin recirculated slurry to be reduced to 48% and the amount of granular slurry to 13%. Implementation of this variant at the Chumakovskaya coal preparation plant will ensure annual savings of 20,000 rubles.

  12. Fiscal 1989 report on the bituminous coal liquefaction section meeting; 1989 nendo rekiseitan ekika bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    At the 1st, 2nd, and 3rd group meetings held for the fiscal year, reports are given and discussions are made about the progress of research and development. Reported and discussed in relation to the progress of the pilot plant support research are studies with the 1t/d PSU (process supporting unit) (Nippon Steel Corporation, Mitsui Coal Liquefaction Co., Ltd., and Japan Coal Oil Co., Ltd.); improvement on distillate distribution (Sumitomo Metal Industries, Ltd.); development of an optimum decalcification technique (Sumitomo Coal Mining Co., Ltd., and Sumitomo Metal Industries, Ltd.); studies of solvent hydrogenation catalysts (Sumitomo Metal Mining Co., Ltd., and Chiyoda Corp.); and studies of coal liquefaction conditions (Mitsui Engineering and Shipbuilding Co., Ltd.). In relation to studies using a bituminous coal liquefaction pilot plant, the progress of the 150t/d PP (pilot plant) effort (Japan Coal Oil, Co., Ltd.) and the outlines of pilot surveys (Japan Coal Oil Co., Ltd.) are reported and discussed, the latter covering liquefaction solvent performance optimization, slurry preheating furnaces, coal slurry properties, and so forth. (NEDO)

  13. Pilot plant development of a new catalytic process for improved electrostatic separation of fly ash in coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Olivares del Valle, J.; Martinez, L.S.; Baum, B.M.; Galeano, V.C. [Universidad de Sevilla (Spain)

    1995-12-31

    The design and operation of pulverized-coal-fired power plants (PCFPP) are usually regarded as fuel range in terms of sulphur and ash contents. These units may give severe environmental problems of fly ash emissions as a result of lower SO{sub 3} contents in the flue gas (FG) because the electrical resistivity of the solid particles is correspondingly lower, with consequent adverse effects on electrostatic precipitator (ESP) efficiency. More stringent air pollution laws cause many power companies to burn lower sulphur coal under boilers in plants that formerly burned higher S coal or ran with abnormal operational conditions (only remediable by shutdown and repairs). This presentation of the GASOX process is a contribution to the improvement of existing technology for flue gas conditioning (FGC), which is defined as a control system for (ESP) efficiency in PCFPP.

  14. FY 1988 report on the committee of the Coal Gasification Committee; 1988 nendo sekitan gaska iinkai hon'iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-03-01

    The paper reported activities of the committee of the Coal Gasification Committee in FY 1988. In the 1st committee meeting, report/discussion were made on the outline of the FY 1988 research plan on the coal gasification technology development. The distributed data were those on the development of entrained bed coal gasification power generation plant (the state of the development of a 200t/d gasification power generation pilot plant), the results of the operation using entrained bed coal gasification equipment, development of coal utilization hydrogen production technology (design/construction of pilot plant) and development of coal utilization hydrogen production technology (support study of pilot plant, study using small equipment). In the 2nd committee meeting, report/discussion were made on activities of sections such as the gasification power generation section and gasification technology section and the state of progress of the coal gasification technology development. The distributed data were those on the development of an entrained bed coal gasification power generation plant, support study of the development of an entrained bed coal gasification power generation plant, etc. (NEDO)

  15. Electrostatic beneficiation of coal

    Energy Technology Data Exchange (ETDEWEB)

    Mazumder, M.K.; Tennal, K.B.; Lindquist, D.

    1994-10-01

    Dry physical beneficiation of coal has many advantages over wet cleaning methods and post combustion flue gas cleanup processes. The dry beneficiation process is economically competitive and environmentally safe and has the potential of making vast amounts of US coal reserves available for energy generation. While the potential of the electrostatic beneficiation has been studied for many years in laboratories and in pilot plants, a successful full scale electrostatic coal cleaning plant has not been commercially realized yet. In this paper the authors review some of the technical problems that are encountered in this method and suggest possible solutions that may lead toward its full utilization in cleaning coal.

  16. 30 CFR 827.12 - Coal preparation plants: Performance standards.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Performance standards...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.12 Coal preparation plants..., modification, reclamation, and removal activities at coal preparation plants shall comply with the following...

  17. Study on standard coal preparation plant for coking coal in Jharia Coalfield

    Energy Technology Data Exchange (ETDEWEB)

    Winiewski, J; Sarkar, G G

    1975-10-01

    The proposed standardization of coal preparation plant will be based on three standard types of crushing station, a standard jig washery or cyclone washery, and three standard types of slurry water treatment section. Some large installations, and some existing washeries after modification, may incorporate heavy media baths for coarse coal and jigs for slack coal, where coal is easy or moderately easy to wash. Flow sheets are given for the standard types of crushing plant, washery, and slurry water circuit. The storage of raw coal and saleable products is briefly discussed.

  18. Technological exchanged natural radioactivity in vicinity of the Coal Burning Power Plant Kakanj, BiH

    International Nuclear Information System (INIS)

    Samek, D.; Saracevic, L.; Gradascevic, N.; Mihalj, A.

    2009-01-01

    CBPP Kakanj is one of the most important Coal Burning Power Plants in Bosnia and Herzegovina (producing power of 450 MW, waste storage site of 5 000 000 tons). Mapping of the measured gamma-dose rate has been performed with the goal of identifying the hot spots in the area of 3x3 km surrounding CBPP Kakanj, with special emphasis on the waste storage site (1x1km). Maximum measured of the gamma-dose rate surrounding CBPP Kakanj was 140 nGy h -1 and in the area of waste storage site 210 nGy h -1 . Average levels of natural radionuclide in agricultural soil samples in vicinity of CBPP Kakanj are: for 238 U is 41±4 Bq kg -1 , 232 Th is 32±1 Bq kg -1 , 226 Ra is 27±2 Bq kg -1 and 40 K is 486±9 Bq kg -1 . Obtained results in soil-plant-animal products chain does not show significantly increased levels of natural radionuclides due to the fact that mentioned radionuclides, in general, have a low transfer factors in soil-plant-animal products chain. (author)

  19. Coal Direct Chemical Looping Retrofit to Pulverized Coal Power Plants for In-Situ CO2 Capture

    Energy Technology Data Exchange (ETDEWEB)

    Zeng, Liang; Li, Fanxing; Kim, Ray; Bayham, Samuel; McGiveron, Omar; Tong, Andrew; Connell, Daniel; Luo, Siwei; Sridhar, Deepak; Wang, Fei; Sun, Zhenchao; Fan, Liang-Shih

    2013-09-30

    A novel Coal Direct Chemical Looping (CDCL) system is proposed to effectively capture CO2 from existing PC power plants. The work during the past three years has led to an oxygen carrier particle with satisfactory performance. Moreover, successful laboratory, bench scale, and integrated demonstrations have been performed. The proposed project further advanced the novel CDCL technology to sub-pilot scale (25 kWth). To be more specific, the following objectives attained in the proposed project are: 1. to further improve the oxygen carrying capacity as well as the sulfur/ash tolerance of the current (working) particle; 2. to demonstrate continuous CDCL operations in an integrated mode with > 99% coal (bituminous, subbituminous, and lignite) conversion as well as the production of high temperature exhaust gas stream that is suitable for steam generation in existing PC boilers; 3. to identify, via demonstrations, the fate of sulfur and NOx; 4. to conduct thorough techno-economic analysis that validates the technical and economical attractiveness of the CDCL system. The objectives outlined above were achieved through collaborative efforts among all the participants. CONSOL Energy Inc. performed the techno-economic analysis of the CDCL process. Shell/CRI was able to perform feasibility and economic studies on the large scale particle synthesis and provide composite particles for the sub-pilot scale testing. The experience of B&W (with boilers) and Air Products (with handling gases) assisted the retrofit system design as well as the demonstration unit operations. The experience gained from the sub-pilot scale demonstration of the Syngas Chemical Looping (SCL) process at OSU was able to ensure the successful handling of the solids. Phase 1 focused on studies to improve the current particle to better suit the CDCL operations. The optimum operating conditions for the reducer reactor such as the temperature, char gasification enhancer type, and flow rate were identified. The

  20. Report on the bituminous coal liquefaction sub-committee in fiscal 1992; 1992 nendo rekiseitan ekika bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    This paper reports the activities of the bituminous coal liquefaction sub-committee in the Sunshine Project in fiscal 1992. With an intention of developing a technology on the process (NEDOL) suitable for liquefaction of wide range of coal types placing sub-bituminous coal at the center, researches were carried out by using a pilot plant, and engineering data purposed for practical application of the technology were acquired. The construction of the pilot plant was launched in fiscal 1991. It is necessary to execute the pilot plant plan steadily in the future, and at the same time, reliably acquire different data by means of supportive researches. Economic performance of the process is also important. The first sub-committee meeting presented the following agenda: the status of constructing the 150-t/d pilot plant, tests and investigations thereon, research works by using a 1-t/d PSU, development of the most suitable coal refining technology, development of a coal pretreatment technology, improvement of the distilled oil distribution, studies on coal liquefaction conditions, and studies on solvent hydrogenating catalysts. The second sub-committee meeting presented the following agenda: the status of constructing the pilot plant, tests and investigations on improving the performance of natural pylite catalyst and circulating solvent, technological investigations on structuring a liquefying reaction data analyzing system, studies using a 1-t/d PSU, development of the most suitable coal refining technology, studies on coal liquefaction conditions, and studies on solvent hydrogenating catalysts. (NEDO)

  1. Axial concentration profiles and N{sub 2}O flue gas in a pilot scale bubbling fluidised bed coal combustor

    Energy Technology Data Exchange (ETDEWEB)

    Tarelho, L.A.C.; Matos, M.A.A.; Pereira, F.J.M.A. [Environment and Planning Department, University of Aveiro, 3810-193 Aveiro (Portugal)

    2005-05-15

    Atmospheric Bubbling Fluidised Bed Coal Combustion (ABFBCC) of a bituminous coal and anthracite with particle diameters in the range 500-4000 {mu}m was investigated in a pilot-plant facility (circular section with 0.25 m internal diameter and 3 m height). The experiments were conducted at steady-state conditions using three excess air levels (10%, 25% and 50%) and bed temperatures in the 750-900 {sup o}C range. Combustion air was staged, with primary air accounting for 100%, 80% and 60% of total combustion air. For both types of coal, virtually no N{sub 2}O was found in significant amounts inside the bed. However, just above the bed-freeboard interface, the N{sub 2}O concentration increased monotonically along the freeboard and towards the exit flue. The N{sub 2}O concentrations in the reactor ranged between 0-90 ppm during bituminous coal combustion and 0-30 ppm for anthracite. For both coals, the lowest values occurred at the higher bed temperature (900 {sup o}C) with low excess air (10%) and high air staging (60% primary air), whereas the highest occurred at the lower bed temperature (750 {sup o}C for bituminous, 825 {sup o}C for anthracite) with high excess air (50%) and single stage combustion. Most of the observed results could be qualitatively interpreted in terms of a set of homogeneous and heterogeneous reactions, where catalytic surfaces (such as char, sand and coal ash) can play an important role in the formation and destruction of N{sub 2}O and its precursors (such as HCN, NH{sub 3} and HCNO) by free radicals (O, H, OH) and reducing species (H{sub 2}, CO, HCs)

  2. Environmental control implications of generating electric power from coal. Appendix B. Assessment of status of technology for solvent refining of coal. 1977 technology status report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    This report reviews the technology and environmental impacts of the solvent refined coal process to produce clean solid fuel (SRC-I). Information on SRC-I pilot plant operation, process design, and economics is presented. A bibliography of current available literature in this technology area, divided into fourteen categories with abstracts of the references, is appended. The history, current operations, and future plans for the SRC pilot plants at Fort Lewis and Wilsonville are reviewed. Process data generated at these pilot plants for various coals are used as a basis for a conceptual commercial plant design with a capacity to process 20,000 tons per day (TPD) of prepared coal. Block flow diagrams, material balances, an energy balance, and a list of raw materials for the plant are also provided. Capital cost estimates for a 20,000 TPD coal feed plant derived from four prior economic studies range from $706 million to $1093 million in 1976 dollars. The annual net operating cost is estimated at $238.6 million (1976 dollars) and the average product cost at $2.71/MM Btu based on utility financing (equity 25:debt 75) with $25/ton as the delivered price of the dry coal. The report also discusses special technical considerations associated with some of the process operations and major equipment items and enumerates technical risks associated with the commercialization of the SRC-I process.

  3. FY 1992 report on the results of the development of an entrained bed coal gasification power plant. Part 1. Element study/Technical survey; 1992 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 1. Youso kenkyu hen, gijutsu chosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-02-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, element study of a 200 t/d entrained bed coal gasification pilot plant was made, and the FY 1992 results were summarized. In the gasification test using a 2 t/d furnace equipment, study was made of the extraction of subjects on the operation, performance of gasification, slagging characteristics and characteristics of flux addition. In the study of slag utilization technology, chemical analysis, test on fine aggregate and test on fine particle were carried out to study applicability of the slag discharged from the entrained bed coal gasification power plant to various materials. In the study of a large gas turbine combustor for the demonstrative machine, the demonstrative machine use large gas turbine combustor testing equipment was installed at actual pressure/actual size combustion testing facilities in the pilot plant and further the test use combustor was integrated into them. By using them, the real gas combustion test was made using the adjusted coal for evaluation of combustion performance of the test use combustor. In the simulation study of the total pilot plant system, the comparative study was made between the data on the test using the actual machine and the results of the simulation. (NEDO)

  4. Reports on 1977 result of research. Investigation for selecting site location of pilot plant for 7,000Nm{sup 3}/day class high calorie gasification; 1977 nendo sunshine keikaku ni kakawaru plant kenkyu kaihatsu seika hokoku. 7,000Nm{sup 3}/nichi kyu kokarori gas ka pilot plant yochi no ricchi sentei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-03-20

    A report was made on the result of investigation for selecting a suitable site for a coal gasification pilot plant. The high calorie gasification plant under the Sunshine Project is scheduled to have a parallel operation of two methods. It could be decided on one only method depending on the future studies. One is the 'water gasification method' using coal only as the raw material, with hydrogen gas added to contrive methanization. The other is the 'hybrid gasification method' using mixed slurry of powdered coal and heavy oil as the raw material, with oxygen supplied to it to form a clean gas. The sites proposed for the pilot plant are the cities of Yubari, Iwaki, Kita-Ibaraki, Tagawa, Iizuka and Imari. The items for assessment of cost effectiveness are the expenses of development of a site, road construction, removal of existing obstacles, plant construction, power receiving equipment construction, irrigation supply facilities construction, wastewater treatment system construction, ash discharging system construction, transportation, and supply/processing-related maintenance. As a result of the assessment, Iwaki city was picked up as the area almost free from drawbacks to cost effectiveness. (NEDO)

  5. Reports on 1977 result of research. Investigation for selecting site location of pilot plant for 7,000Nm{sup 3}/day class high calorie gasification; 1977 nendo sunshine keikaku ni kakawaru plant kenkyu kaihatsu seika hokoku. 7,000Nm{sup 3}/nichi kyu kokarori gas ka pilot plant yochi no ricchi sentei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-03-20

    A report was made on the result of investigation for selecting a suitable site for a coal gasification pilot plant. The high calorie gasification plant under the Sunshine Project is scheduled to have a parallel operation of two methods. It could be decided on one only method depending on the future studies. One is the 'water gasification method' using coal only as the raw material, with hydrogen gas added to contrive methanization. The other is the 'hybrid gasification method' using mixed slurry of powdered coal and heavy oil as the raw material, with oxygen supplied to it to form a clean gas. The sites proposed for the pilot plant are the cities of Yubari, Iwaki, Kita-Ibaraki, Tagawa, Iizuka and Imari. The items for assessment of cost effectiveness are the expenses of development of a site, road construction, removal of existing obstacles, plant construction, power receiving equipment construction, irrigation supply facilities construction, wastewater treatment system construction, ash discharging system construction, transportation, and supply/processing-related maintenance. As a result of the assessment, Iwaki city was picked up as the area almost free from drawbacks to cost effectiveness. (NEDO)

  6. CHARACTERIZATION AND MODELING OF THE FORMS OF MERCURY FROM COAL-FIRED POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    Dennis L. Laudal

    2001-08-01

    The 1990 Clean Air Act Amendments (CAAAs) required the U.S. Environmental Protection Agency (EPA) to determine whether the presence of mercury in the stack emissions from fossil fuel-fired electric utility power plants poses an unacceptable public health risk. EPA's conclusions and recommendations were presented in the Mercury Study Report to Congress (1) and the Utility Air Toxics Report to Congress (1). The first report addressed both the human health and environmental effects of anthropogenic mercury emissions, while the second addressed the risk to public health posed by the emission of mercury and other hazardous air pollutants from steam-electric generating units. Given the current state of the art, these reports did not state that mercury controls on coal-fired electric power stations would be required. However, they did indicate that EPA views mercury as a potential threat to human health. In fact, in December 2000, the EPA issued an intent to regulate for mercury from coal-fired boilers. However, it is clear that additional research needs to be done in order to develop economical and effective mercury control strategies. To accomplish this objective, it is necessary to understand mercury behavior in coal-fired power plants. The markedly different chemical and physical properties of the different mercury forms generated during coal combustion appear to impact the effectiveness of various mercury control strategies. The original Characterization and Modeling of the Forms of Mercury from Coal-Fired Power Plants project had two tasks. The first was to collect enough data such that mercury speciation could be predicted based on relatively simple inputs such as coal analyses and plant configuration. The second was to field-validate the Ontario Hydro mercury speciation method (at the time, it had only been validated at the pilot-scale level). However, after sampling at two power plants (the Ontario Hydro method was validated at one of them), the EPA issued

  7. Pyrolysis of coal, biomass and their blends: performance assessment by thermogravimetric analysis.

    Science.gov (United States)

    Ferrara, Francesca; Orsini, Alessandro; Plaisant, Alberto; Pettinau, Alberto

    2014-11-01

    With the aim to support the experimental tests in a gasification pilot plant, the thermal decomposition of coal, biomass and their mixtures has been carried out through a thermogravimetric analysis (TGA) and a simplified kinetic analysis. The TGA of pure fuels indicates the low reactivity of South African coal and the relatively high reactivity of Sardinian Sulcis coal during pyrolysis. Among the tested fuels, biomass (stone pine wood chips) is the most reactive one. These results fully confirm those obtained during the experimental tests in the gasification pilot plant. As for the fuel blends, the analysis shows that the synergic effects between the considered coals and biomass are negligible when they are co-pyrolyzed. The results of the analysis confirm that TGA could be very useful to generally predict the gasification performance and to optimize the experimental campaigns in pilot-scale gasification plants. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. Effect of H/C ratio on coal ignition

    Energy Technology Data Exchange (ETDEWEB)

    Furimsky, E.

    1988-09-01

    The Cahn balance technique was found to be suitable for estimating ignition temperature and its dependence on the H/C ratio of the coal. This temperature decreased with increasing H/C ratio of coals. For coals a linear correlation between H/C ratio and the temperature was established. Chars derived from the coals deviated from the linear correlation established on coals. 17 refs., 4 figs.

  9. Coal gasification. Quarterly report, January--March 1977

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    High-Btu natural gas has a heating value of 950 to 1,000 Btu per standard cubic foot, is composed essentially of methane, and contains virtually no sulfur, carbon monoxide, or free hydrogen. The conversion of coal to high-Btu gas requires a chemical and physical transformation of solid coal. However, because coal has widely differing chemical and physical properties, depending on where it is mined, it is difficult to process. Therefore, to develop the most suitable techniques for gasifying coal, ERDA, together with the American Gas Association is sponsoring the development of several advanced conversion processes. Although the basic coal-gasification chemical reactions are the same for each process, the processes under development have unique characteristics. A number of the processes for converting coal to high Btu and to low Btu gas have reached the pilot plant stage. The responsibility for designing, constructing and operating each of these pilot plants is defined and progress on each during the quarter is described briefly. The accumulation of data for a coal gasification manual and the development of mathematical models of coal gasification processes are reported briefly. (LTN)

  10. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  11. Environmental impacts of coal mine and thermal power plant to the surroundings of Barapukuria, Dinajpur, Bangladesh.

    Science.gov (United States)

    Hossain, Md Nazir; Paul, Shitangsu Kumar; Hasan, Md Muyeed

    2015-04-01

    The study was carried out to analyse the environmental impacts of coal mine and coal-based thermal power plant to the surrounding environment of Barapukuria, Dinajpur. The analyses of coal, water, soil and fly ash were carried out using standard sample testing methods. This study found that coal mining industry and coal-based thermal power plant have brought some environmental and socio-economic challenges to the adjacent areas such as soil, water and air pollution, subsidence of agricultural land and livelihood insecurity of inhabitants. The pH values, heavy metal, organic carbon and exchangeable cations of coal water treated in the farmland soil suggest that coal mining deteriorated the surrounding water and soil quality. The SO4(2-) concentration in water samples was beyond the range of World Health Organisation standard. Some physico-chemical properties such as pH, conductivity, moisture content, bulk density, unburned carbon content, specific gravity, water holding capacity, liquid and plastic limit were investigated on coal fly ash of Barapukuria thermal power plant. Air quality data provided by the Barapukuria Coal Mining Company Limited were contradictory with the result of interview with the miners and local inhabitants. However, coal potentially contributes to the development of economy of Bangladesh but coal mining deteriorates the environment by polluting air, water and soil. In general, this study includes comprehensive baseline data for decision makers to evaluate the feasibility of coal power industry at Barapukuria and the coalmine itself.

  12. Summary of the research achievements in fiscal 1988. Development of coal liquefaction technologies; Sekitan ekika gijutsu kaihatsu. 1988 nendo kenkyu seika no gaiyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-03-01

    This paper reports the summary of the research and development works in fiscal 1988. The following researches were carried out: as development of a bituminous coal liquefaction technology, studies by using a pilot plant, studies on support of the pilot plant (studies by using an experimental plant (studies by using a 1-t/d PSU, development of an optimal pretreatment technology for coals to be used for liquefaction, studies on improvement in fraction oil distribution in the NEDOL process, and studies by using a 1-t/d plant)), and (studies by using a small device (studies on coal liquefying conditions, and studies on solvent hydrogenation catalysts)). Studies were carried out on operation of the pilot plant, and on support of the pilot plant operation. Materials for auxiliary machinery were developed (including in-plant test of new materials), and so were the devices (including development of a let-down valve) as trial fabrication and development of the plant devices and materials. As coal type selection and survey, coal types were surveyed, and liquefaction performance of Chinese coals was tested. In order to develop applications of coal liquefied products and a refining technology, developments were carried out on up-grading of the coal liquefied oil, a petroleum mixing technology, and a technology to separate hetero compounds in coal liquefied oil, and applications of the compounds. (NEDO)

  13. Heating plant overcomes coal crisis

    International Nuclear Information System (INIS)

    Sobinkovic, B.

    2006-01-01

    At the last moment Kosice managed to overcome the threat of a more than 30-percent heating price increase. The biggest local heat producer, Teplaren Kosice, is running out of coal supplies. The only alternative would be gas, which is far more expensive. The reason for this situation was a dispute of the heating plant with one of its suppliers, Kimex. Some days ago, the dispute was settled and the heating plant is now expecting the first wagon loads of coal to arrive. These are eagerly awaited, as its supplies will not last for more than a month. It all started with a public tender for a coal supplier. Teplaren Kosice (TEKO) announced the tender for the delivery of 120,000 tons of coal in June. Kimex, one of the traditional and biggest suppliers, was disqualified in the course of the tender. The winners of the tender were Slovenergo, Bratislava and S-Plus Trade, Vranov nad Toplou. TEKO signed contracts with them but a district court in Kosice prohibited the company from purchasing coal from these contractors. Kimex filed a complaint claiming that it was disqualified unlawfully. Based on this the court issued a preliminary ruling prohibiting the purchase of coal from the winners of the tender. The heating plant had to wait for the final verdict. The problem was then solved by the company's new Board of Directors, who were appointed in mid October who managed to sign new contracts with the two winners and Kimex. The new contracts cover the purchase of 150-thousand tons of coal, which is 30,000 more than in the original tender specification. Each company will supply one third. (authors)

  14. Report on the achievements in the projects subsidized by the Sunshine Project in fiscal 1981. Data 2. Development of a coal liquefaction technology - development of a solvent extraction and liquefaction technology - 'development of a brown coal based solvent extraction plant' (Development of a 50-t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (shiryo 2). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Developmental researches were carried out on a liquefaction plant for the Victoria brown coal produced in Australia (a 50-t/d pilot plant). In fiscal 1981, detailed design was performed on the primary hydrogenation system by using the process conception and the design data obtained in the element studies. Part of the devices was procured, and the site construction was begun. The present data is a collection of drawings in relation with the machine design, such as the piping specifications, standard piping drawings, piping design procedures, piping drawings, pipe lists, and device inspection specifications. In relation with the instrumentation design, the instrumentation engineering specifications and meter lists. (NEDO)

  15. Radioactivity of coals and ash and slag wastes at coal-fired thermal power plants

    Science.gov (United States)

    Krylov, D. A.; Sidorova, G. P.

    2013-04-01

    This paper presents an analysis of published data on the content of radioactive nuclides in coals originating from various coal deposits, and in ash and slag wastes produced at coal-fired thermal power plants, as well as in fly ash emitted from thermal power plants into the atmosphere. Problems related to the use of coals with an elevated content of natural radionuclides (NRNs) and methods of their solution implemented at the Urtuyskoe coalfield are dealt with. Data on the analysis of Transbaikal coals for the NRN content, as well as weighted mean content of uranium and thorium in coals from the Siberian Region, are given. In order to reduce irradiation of plant personnel and the population of the areas where coal producers and coal-fired thermal power plants are located, it is necessary to organize very careful control of the NRN content in both coals and products of their combustion that are released into the environment. To solve the problem related to the control of radioactivity, the centralized approach and creation of a proper normative base are needed. Experience gained in developing the Urtuyskoe coalfield shows that it is possible to create an efficient system of coal quality control with respect to the radiation hygiene factor and provide protection of the environment and health of the population.

  16. Characterization of substances in products, effluents, and wastes from coal conversion processes

    International Nuclear Information System (INIS)

    Petersen, M.R.

    1978-01-01

    Researchers at Pacific Northwest Laboratory (PNL) are investigating materials from synthetic fossil fuel processes. During the past year, samples have been collected from the Solvent Refining Coal Pilot Plant (SRC-I mode), Lignite Gasification Pilot Plant, Eyring Research Institute Gasifier, and Hanna III In Situ Coal Gasification Experiment. Inorganic and organic analyses have been performed, and comparisons of the data show some important differences in the potential emissions

  17. Predictions of the impurities in the CO2 stream of an oxy-coal combustion plant

    International Nuclear Information System (INIS)

    Liu, Hao; Shao, Yingjuan

    2010-01-01

    Whilst all three main carbon capture technologies (post-combustion, pre-combustion and oxy-fuel combustion) can produce a CO 2 dominant stream, other impurities are expected to be present in the CO 2 stream. The impurities in the CO 2 stream can adversely affect other processes of the carbon capture and storage (CCS) chain including the purification, compression, transportation and storage of the CO 2 stream. Both the nature and the concentrations of potential impurities expected to be present in the CO 2 stream of a CCS-integrated power plant depend on not only the type of the power plant but also the carbon capture method used. The present paper focuses on the predictions of impurities expected to be present in the CO 2 stream of an oxy-coal combustion plant. The main gaseous impurities of the CO 2 stream of oxy-coal combustion are N 2 /Ar, O 2 and H 2 O. Even the air ingress to the boiler and its auxiliaries is small enough to be neglected, the N 2 /Ar concentration of the CO 2 stream can vary between ca. 1% and 6%, mainly depending on the O 2 purity of the air separation unit, and the O 2 concentration can vary between ca. 3% and 5%, mainly depending on the combustion stoichiometry of the boiler. The H 2 O concentration of the CO 2 stream can vary from ca. 10% to over 40%, mainly depending on the fuel moisture and the partitioning of recycling flue gas (RFG) between wet-RFG and dry-RFG. NO x and SO 2 are the two main polluting impurities of the CO 2 stream of an oxy-coal combustion plant and their concentrations are expected to be well above those found in the flue gas of an air-coal combustion plant. The concentration of NO x in the flue gas of an oxy-coal combustion plant can be up to ca. two times to that of an equivalent air-coal combustion plant. The amount of NO x emitted by the oxy-coal combustion plant, however, is expected to be much smaller than that of the air-coal combustion plant. The reductions of the recirculated NO x within the combustion

  18. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Part 1. Element study; 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 1. Yoso kenkyu hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    For the purpose of establishing the technology of integrated coal gasification combined cycle power generation, element study was conducted of a 200t/d entrained bed coal gasification pilot plant, and the FY 1989 results were summarized. In the gasification test using 2t/d gasifier equipment, the following were carried out: test on gasification of the coal proposed for pilot plant, test on changes in coal feed ratio, analysis of trace gas elements in coal, study of the fixed bed gas refining system, etc. In the study of large gas turbine combustor for demonstration machine, development of combustor which makes stable combustion in the low load region possible, development of low NOx combustor which controls the conversion of nitrogen compounds such as ammonia in coal gasification gas to NOx, development of combustor which makes the optimum and effective cooling possible by combining film cooling, impingement cooling, etc. In the study of simulation of the combined power generation total system, verification tests on the control mode switching function of the general load pressure control system, movement to meet anomaly of the control system, integrated cooperation control system, etc. (NEDO)

  19. FY 1991 report on the Coal Gasification Committee; 1991 nendo sekitan gasuka iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    The paper reported activities of the Coal Gasification Committee, gasification power generation section and gasification technology section in FY 1991. The 1st Coal Gasification Committee Meeting was held on July 16,1991, and report/discussion were made about an outline of the FY 1991 research plan on the development of coal gasification technology. The 2nd Meeting was held on March 12, 1992, and report/discussion were made about activities of each section meeting and the progress of the development of coal gasification technology. In the section meeting of coal gasification power generation, report/discussion were made about the progress and study object of the development of entrained bed coal gasification power plant and support study for the development of the plant. In the 1st section meeting of coal gasification technology, as to the developmental plan on coal utilization hydrogen production technology, report/discussion were made about design/construction/operational study of pilot plant and support study for pilot plant (study using small equipment, study of trial manufacture of plant use equipment/materials). In the 2nd section meeting, report/discussion were made about the results of the development of coal utilization hydrogen production technology. (NEDO)

  20. Combined compressed air storage-low BTU coal gasification power plant

    Science.gov (United States)

    Kartsounes, George T.; Sather, Norman F.

    1979-01-01

    An electrical generating power plant includes a Compressed Air Energy Storage System (CAES) fueled with low BTU coal gas generated in a continuously operating high pressure coal gasifier system. This system is used in coordination with a continuously operating main power generating plant to store excess power generated during off-peak hours from the power generating plant, and to return the stored energy as peak power to the power generating plant when needed. The excess coal gas which is produced by the coal gasifier during off-peak hours is stored in a coal gas reservoir. During peak hours the stored coal gas is combined with the output of the coal gasifier to fuel the gas turbines and ultimately supply electrical power to the base power plant.

  1. Coal resources available for development; a methodology and pilot study

    Science.gov (United States)

    Eggleston, Jane R.; Carter, M. Devereux; Cobb, James C.

    1990-01-01

    Coal accounts for a major portion of our Nation's energy supply in projections for the future. A demonstrated reserve base of more than 475 billion short tons, as the Department of Energy currently estimates, indicates that, on the basis of today's rate of consumption, the United States has enough coal to meet projected energy needs for almost 200 years. However, the traditional procedures used for estimating the demonstrated reserve base do not account for many environmental and technological restrictions placed on coal mining. A new methodology has been developed to determine the quantity of coal that might actually be available for mining under current and foreseeable conditions. This methodology is unique in its approach, because it applies restrictions to the coal resource before it is mined. Previous methodologies incorporated restrictions into the recovery factor (a percentage), which was then globally applied to the reserve (minable coal) tonnage to derive a recoverable coal tonnage. None of the previous methodologies define the restrictions and their area and amount of impact specifically. Because these restrictions and their impacts are defined in this new methodology, it is possible to achieve more accurate and specific assessments of available resources. This methodology has been tested in a cooperative project between the U.S. Geological Survey and the Kentucky Geological Survey on the Matewan 7.5-minute quadrangle in eastern Kentucky. Pertinent geologic, mining, land-use, and technological data were collected, assimilated, and plotted. The National Coal Resources Data System was used as the repository for data, and its geographic information system software was applied to these data to eliminate restricted coal and quantify that which is available for mining. This methodology does not consider recovery factors or the economic factors that would be considered by a company before mining. Results of the pilot study indicate that, of the estimated

  2. FY 1991 report on the results of the development of an entrained bed coal gasification power plant. Part 3. Adjustment of the operation test of pilot plant (2/2); 1991 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant unten shiken chosei hen (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-01-01

    The adjustment was made of the operation test of the 200 t/d entrained bed coal gasification pilot plant that was constructed with the aim of establishing technology of the integrated coal gasification combined cycle power generation, and the results were reported. As to the adjustment of the operation test of gas turbine facilities, the following were conducted: tests 1 and 2 on light-oil firing characteristics, test on coal gas ignition, tests on fuel change/gas firing, test on fuel change. And, 12 cases of troubles, the causes and measures against them were reported. Relating to the adjustment of the operation test of actual pressure/actual size combustor testing facilities, tests on hot air device/air heating device and tests 1-3 on light-oil firing were carried out, and 7 cases of troubles, the causes and measures against them were reported. Concerning the adjustment of the operation test of safety environment facilities, tests were made of RUN 3-6, RUN 7 (1 and 2), RUN 8 (1-4) and RUN 9 (1-3), and 20 cases of troubles, the causes and measures against them were reported. As to the adjustment of the operation test of electric/control facilities, items of improvement were reported of gasifier facilities, gas refining facilities, gas turbine facilities, actual pressure/actual size combustor testing facilities, safety environment facilities and total control facilities. (NEDO)

  3. Action of coal gas on plants. II. Action on green plants

    Energy Technology Data Exchange (ETDEWEB)

    Wehmer, C

    1917-01-01

    Experiments were performed to determine the effects of coal gas on cress. Although the seeds are not killed by coal gas, they are prevented from germinating. Cress will grow in as much as 30% coal gas, but it will not survive higher concentrations. Coal gas contains both toxic and non-toxic constituents. CO, C/sub 2/H/sub 4/, C/sub 2/H/sub 2/, CS/sub 2/, H/sub 2/S are not toxic at concentrations found in coal gas. The toxic effects of coal gas are not caused by the lack of O/sub 2/, but by minor impurities in the gas.

  4. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Part 3. Fabrication/installation of pilot plant (Fabrication/installation drawings and fabrication/installation pictures - 1/2); 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant seisaku suetsuke hen (Seisaku suetsukezu oyobi seisaku suetsuke shashin) (1/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and drawings of fabrication/installation in the FY 1989 were summarized. In fabrication/installation drawings, drawings of the following were included: layout of the total system and the yard, gasifier facilities (assembly drawing of the pressure part of gasifier, drawing of machinery arrangement of gasifier facilities, system diagram of raw coal receiving device, system diagram of pulverized coal feed equipment, system diagram of char feed equipment, etc.), gas refining facilities - dry desulfurizer (assembly drawing of desulfurizing agent carrying filter, assembly drawing of regeneration tower filter, structural drawing of SO{sub 2} reduction tower filter, assembly drawing of start-up heater, etc.), gas refining facilities - dry dust removal system (assembly drawing of No.1 dust separation filter, installation drawing of elevator, etc.), gas turbine facilities (cross section of gas turbine, front view of gas turbine, structural cross section of gas turbogenerator, etc.), actual-pressure/actual-size combustor test equipment (structural drawing of test stand, structural drawing of exhaust temperature reduction device, assembly/sectioned drawing of low-pressure air compressor, etc.) (NEDO)

  5. BOILER MATERIALS FOR ULTRASUPERCRITICAL COAL POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    R. Viswanathan; K. Coleman; R.W. Swindeman; J. Sarver; J. Blough; W. Mohn; M. Borden; S. Goodstine; I. Perrin

    2003-10-20

    The principal objective of this project is to develop materials technology for use in ultrasupercritical (USC) plant boilers capable of operating with 760 C (1400 F), 35 MPa (5000 psi) steam. This project has established a government/industry consortium to undertake a five-year effort to evaluate and develop of advanced materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 760 C, will increase the efficiency of coal-fired boilers from an average of 35% efficiency (current domestic fleet) to 47% (HHV). This efficiency increase will enable coal-fired power plants to generate electricity at competitive rates (irrespective of fuel costs) while reducing CO{sub 2} and other fuel-related emissions by as much as 29%. Success in achieving these objectives will support a number of broader goals. First, from a national prospective, the program will identify advanced materials that will make it possible to maintain a cost-competitive, environmentally acceptable coal-based electric generation option. High sulfur coals will specifically benefit in this respect by having these advanced materials evaluated in high-sulfur coal firing conditions and from the significant reductions in waste generation inherent in the increased operational efficiency. Second, from a national prospective, the results of this program will enable domestic boiler manufacturers to successfully compete in world markets for building high-efficiency coal-fired power plants.

  6. Fiscal 1990 report. Overseas surveys out of surveys for coal hydrogasification technology development; 1990 nendo sekitan suiten gaska gijutsu kaihatsu chosa ni okeru kaigai chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-12-01

    For the selection and evaluation of coal gasification processes suitable for substitute natural gas (SNG) production, visits were made to overseas business corporations, research institutes, etc., engaged in the development of coal gasification technology, surveys were conducted of the status of development abroad, and information was collected. Visited were Westfield Development Center, British Gas plc; Midlands Research Station, British Gas plc; IEA Coal Research; IFP (Institut Francais de Petrole); and DMT-FP (DMT-Gesellschaft fur Forschung und Prufung mbH). The Westfield Development Center uses coal from near-by open cut mines and supplies town gas to the Scottish region. The slagging Lurgi process, etc., were investigated. At Midlands Research Station, where a coal hydrogasification process is under development, the history of development and the cold model test were summarized, a test plan using a 5 tons/day pilot plant and the modification of test facilities were explained, and the 5 tons/day pilot plant was visited for study. (NEDO)

  7. Prospects for advanced coal-fuelled fuel cell power plants

    International Nuclear Information System (INIS)

    Jansen, D.; Laag, P.C. van der; Oudhuis, A.B.J.; Ribberink, J.S.

    1994-01-01

    As part of ECN's in-house R and D programmes on clean energy conversion systems with high efficiencies and low emissions, system assessment studies have been carried out on coal gasification power plants integrated with high-temperature fuel cells (IGFC). The studies also included the potential to reduce CO 2 emissions, and to find possible ways for CO 2 extraction and sequestration. The development of this new type of clean coal technology for large-scale power generation is still far off. A significant market share is not envisaged before the year 2015. To assess the future market potential of coal-fuelled fuel cell power plants, the promise of this fuel cell technology was assessed against the performance and the development of current state-of-the-art large-scale power generation systems, namely the pulverized coal-fired power plants and the integrated coal gasification combined cycle (IGCC) power plants. With the anticipated progress in gas turbine and gas clean-up technology, coal-fuelled fuel cell power plants will have to face severe competition from advanced IGCC power plants, despite their higher efficiency. (orig.)

  8. Clean coal technology and advanced coal-based power plants

    International Nuclear Information System (INIS)

    Alpert, S.B.

    1991-01-01

    Clean Coal Technology is an arbitrary terminology that has gained increased use since the 1980s when the debate over acid raid issues intensified over emissions of sulfur dioxide and nitrogen oxides. In response to political discussions between Prime Minister Brian Mulroney of Canada and President Ronald Reagan in 1985, the US government initiated a demonstration program by the Department of Energy (DOE) on Clean Coal Technologies, which can be categorized as: 1. precombustion technologies wherein sulfur and nitrogen are removed before combustion, combustion technologies that prevent or lower emissions as coal is burned, and postcombustion technologies wherein flue gas from a boiler is treated to remove pollutants, usually transforming them into solids that are disposed of. The DOE Clean Coal Technology (CCT) program is being carried out with $2.5 billion of federal funds and additional private sector funds. By the end of 1989, 38 projects were under way or in negotiation. These projects were solicited in three rounds, known as Clean Coal I, II, and III, and two additional solicitations are planned by DOE. Worldwide about 100 clean coal demonstration projects are being carried out. This paper lists important requirements of demonstration plants based on experience with such plants. These requirements need to be met to allow a technology to proceed to commercial application with ordinary risk, and represent the principal reasons that a demonstration project is necessary when introducing new technology

  9. The economics of coal-fired power plants

    International Nuclear Information System (INIS)

    2008-10-01

    Coal-fired plants are the most polluting way to produce electricity due to their high CO2 emissions. But are they a good choice from an economic point of view? According to Greenpeace the answer is no: the price of coal is rising, construction costs are increasing and CO2 emissions will be priced. Nevertheless, E.On is developing plans for a new coal-fired plant at the Maasvlakte with the support of the Dutch government. [mk] [nl

  10. Report on the achievements in the projects subsidized by the Sunshine Project in fiscal 1981. Data 3. Development of a coal liquefaction technology - development of a solvent extraction and liquefaction technology - 'development of a brown coal based solvent extraction plant' (Development of a 50-t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (shiryo 3). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Developmental researches were carried out on a liquefaction plant for the Victoria brown coal produced in Australia (a 50-t/d pilot plant). In fiscal 1981, detailed design was performed on the primary hydrogenation system by using the process conception and the design data obtained in the element studies. Part of the devices was procured, and the site construction was begun. The present data is a collection of drawings in relation with the instrumentation design, such as the meter specifications, front view drawings for meter panels, drawings for panel arrangement in the central control room, a computer room layout drawing, control system explanation drawings, interlock diagrams, and the instrumentation power supply diagrams. (NEDO)

  11. Fiscal 1993 report. Coal liquefaction committee; 1993 nendo sekitan ekika iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    The committee in this fiscal year had the 1st meeting in July 1993, the 2nd in December 1993, and the 3rd in March 1994, when fiscal 1993 research and development programs and results were reported and discussed. Reported and discussed at the 2nd meeting were the compilation of brown coal liquefaction technology development project results, evaluation report on the same, hydrorefining of oil from brown coal and the research and development of application technologies for the same, and an environmental safety evaluation test on the same. In selecting a standard coal for the operation of the 150 ton/day pilot plant, PSU (process supporting unit)-aided studies were made on the analytical values presented by coals, yield of the liquid, yield of the liquefaction residue, yield of the generated gas, amount of the hydrogen consumed, coal oil properties, liquefaction residue properties, operationality, etc. On-site investigations were conducted also in Indonesia, and a conclusion was reached that Tanito Harum coal would be the most suitable for the pilot plant. Concerning the liquefaction catalyst for the pilot plant, a report was given on a comparison made between the activity of a synthetic iron sulfide and that of natural pyrite. (NEDO)

  12. Report on the achievements in the projects subsidized by the Sunshine Project in fiscal 1981. Data 2. Development of a coal liquefaction technology - development of a solvent extraction and liquefaction technology - 'development of a brown coal based solvent extraction plant' (Development of a 50-t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (shiryo 2). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Developmental researches were carried out on a liquefaction plant for the Victoria brown coal produced in Australia (a 50-t/d pilot plant). In fiscal 1981, detailed design was performed on the primary hydrogenation system by using the process conception and the design data obtained in the element studies. Part of the devices was procured, and the site construction was begun. The present data is a collection of drawings in relation with the machine design, such as the piping specifications, standard piping drawings, piping design procedures, piping drawings, pipe lists, and device inspection specifications. In relation with the instrumentation design, the instrumentation engineering specifications and meter lists. (NEDO)

  13. Coal gasification coal by steam using process heat from high-temperature nuclear reactors

    International Nuclear Information System (INIS)

    Heek, K.H. van; Juentgen, H.; Peters, W.

    1982-01-01

    This paper outlines the coal gasification process using a high-temperature nuclear reactor as a source of the process heat needed. Compared to conventional gasification processes coal is saved by 30-40%, coal-specific emissions are reduced and better economics of gas production are achieved. The introductory chapter deals with motives, aims and tasks of the development, followed by an explanation of the status of investigations, whereby especially the results of a semi-technical pilot plant operated by Bergbau-Forschung are given. Furthermore, construction details of a full-scale commercial gasifier are discussed, including the development of suitable alloys for the heat exchanger. Moreover problems of safety, licensing and economics of future plants have been investigated. (orig.) [de

  14. Design and implementation of a field pilot study on using coal fly ash to prevent oxidation of reactive mine tailings

    International Nuclear Information System (INIS)

    Wang, H.L.; Shang, J.Q.; Xu, Y.Q.; Yanful, E.K.

    2009-01-01

    This paper reported on a pilot scale study that investigated the feasibility of using coal fly ash in mine tailings management and acid mine drainage (AMD) treatment at Goldcorp's Musselwhite Mine site in northern Ontario. The principles and key aspects of the fly ash application in mine tailings management were described. Fly ash from the Atikokan coal-fired power generating plant was added to the Musselwhite tailings as a mixture as well as intermediate and top layers. The physical, chemical and hydrogeological effects of the two approaches were monitored. The paper provided details of the design, implementation, monitoring, sampling and testing over 2 years. The objectives were to evaluate the optimum mass ratio of coal fly ash and mine tailings, effectiveness in reducing the infiltration of precipitation, and projected long-term durability and performance on tailings oxidation prevention. The pilot study was designed based on the principles of cementitious materials formation and secondary mineral formation by the reactions of coal fly ash and water/AMD. Calcium oxide, aluminum oxide, silicon oxide, and ferric oxide are major components of coal fly ash. The preliminary test results revealed that water did not accumulate and cracks did not form on top of 4 tanks. The settlements of the mixing approaches were lower than that of the stratified approach and the temperature distributions in the 4 tanks were comparable. 9 refs., 3 tabs., 11 figs.

  15. Kvanefjeld refinery pilot plant operations

    International Nuclear Information System (INIS)

    Krebs, Damien; Furfaro, Domenic

    2016-01-01

    Greenland Minerals and Energy is a junior project development company which is listed on the Australian Stock Exchange (asx:GGG). It is developing the Kvanefjeld rare earth and uranium project located in the southern tip of Greenland. The project has completed a Feasibility Study and is currently in the permitting phase. Last year was a busy time for the company as it completed a Feasibility Study, a mining licence application (draft submitted in December 2015) and pilot plant operations. Beneficiation pilot plant operations were completed at GTK in Finland in April 2015. This pilot plant treated approximately 30 tonnes of ore to producing almost 2 tonnes of rare earth mineral concentrate. Later in the year a hydrometallurgical pilot plant was performed which mimicked the Refinery process. This pilot plant was performed at Outotec’s Pori Research laboratories in Finland from September till October 2015. The pilot plant treated approximately 200 kilograms of concentrate over 4 split operating campaigns. Each campaign was performed to focus on the performance of a specific part of the refinery flowsheet. This allowed for full operating focus on a single unit operation to ensure that it was operating correctly. The pilot plant operations were quite successful with no major issues with the flowsheet identified through continuous operation. Some fine tuning of conditions was required to ensure adequate removal of impurities was performed with recycle streams incorporated. Overall the leach extractions observed in the pilot plant exceeded the design assumptions in the Feasibility Study. These programs were partially funded by the EURARE program. The EURARE program aims to encourage the sustainable development of European based rare earth projects. This has the goal of allowing Europe to become less reliant on importation of these key raw materials. The professionalism and performance of both GTK and Outotec contributed significantly to the success of the pilot plant

  16. Is There Any Future For Coal Power Plants In Europe?

    Directory of Open Access Journals (Sweden)

    A. V. Zimakov

    2017-01-01

    Full Text Available The article deals with the policies of EU countries towards coal power plants as well as practical steps taken by their governments. Coal power plants are widely considered to be environmentally harmful which confronts with environmental policies of the EU suggesting Europe-wide cuts of greenhouse gas emissions. Based on that assumption a number of EU countries such asBelgium,Austria,Portugal,Dania,Finland,SwedenandUKare striving to phase out coal power plants and achieved significant progress on this path replacing coal with other generation sources. On the other hand, other EU members are lagging behind as coal phase-out is not an urgent item of their political agenda. This situation is typical forIreland,Netherlands,Italy,Croatia,SloveniaandSlovakia. Domestic coal extracting industry can pose a significant hindering factor for a coal power plants phase-out and can effectively block the process. This is the case inBulgaria,Romania,Hungary,CzechRepublic,GreeceandPoland. ButGermany, which also has a well-developed coal industry, transforms its energy sector towards a green one cutting the share of coal in the generation mix. If this effort of the German government proves successful it will deliver a positive transformation model for other EU countries with a large share of coal in generation-mix due to domestic coal extraction industry. The analysis of the political and economic (both macro and micro processes leads to conclusion that there is no unity among EU member states in their approach towards coal fired power plants phase-out. This will allow for coal power plants to retain their market share in a short to medium term. But in the longer run one can expect a significant decrease of coal fired generation inEurope, even in the countries traditionally dependent on coal.

  17. Coal consumption minimizing by increasing thermal energy efficiency at ROMAG-PROD Heavy Water Plant

    International Nuclear Information System (INIS)

    Preda, Marius Cristian

    2006-01-01

    ROMAG-PROD Heavy Water Plant is a large thermal energy consumer using almost all the steam output from ROMAG-TERMO Power Plant - the steam cost weight in the total heavy water price is about 40%. The steam consumption minimizing by modernization of isotopic exchange facilities and engineering development in ROMAG-PROD Heavy Water Plant results in an corresponding decrease of coal amount burned at ROMAG-TERMO boilers. This decrease could be achieved mainly by the followings ways: - Facility wrappings integrity; - High performance heat exchangers; - Refurbished heat insulations; - Modified condenser-collecting pipeline routes; - High performance steam traps; - Heat electric wire. When coal is burned in Power Plant burners to obtain thermal energy, toxic emissions results in flue gases, such as: - CO 2 and NO x with impact on climate warming; - SO 2 which results in ozone layer thinning effect and in acid rain falls. From the value of steam output per burned coal: 1 GCal steam = 1.41 tone steam = 0.86 thermal MW = 1.1911 tones burned coal (lignite), it is obvious that by decreasing the thermal energy consumption provided for ROMAG PROD, a coal amount decrease is estimated at about 45 t/h, or about 394,200 t/year coal, which means about 10% of the current coal consumption at ROMAG-TERMO PP. At the same time, by reducing the burned coal amount, an yearly decrease in emissions into air to about 400,000 tones CO 2 is expected

  18. Achievement report for fiscal 1981 on Sunshine Program-assisted project. Data 5. Development of coal liquefaction technology/Development of solvent extraction liquefaction technology/Development of brown coal solvent extraction plant (Development of 50t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (shiryo 5). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Research is conducted for the development of a liquefaction plant (50t/d pilot plant) for Australia's Victorian brown coal. In fiscal 1981, using the process concept and design data obtained through the study of elementary matters, a detailed design of a primary hydrogenation system is drawn, part of the equipment is procured, and on-site construction work is started. The book is a collection of materials which include engineering specifications related to electrical designs, lists of electrical items, specifications related to civil engineering designs, drawings such as planning drawings, and a detailed construction design drawn by an Australian engineering corporation and related documents and drawings. Concerning the manufacture of mechanical systems, items procurable in Japan, specifications of items procurable in Australia, lists, drawings, etc., are shown. Also included are the details of on-site preparation for construction and on-site work, conceptual designs of processes of dehydration, deashing, and secondary hydrogenation, etc. (NEDO)

  19. Achievement report for fiscal 1981 on Sunshine Program-assisted project. Data 5. Development of coal liquefaction technology/Development of solvent extraction liquefaction technology/Development of brown coal solvent extraction plant (Development of 50t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (shiryo 5). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Research is conducted for the development of a liquefaction plant (50t/d pilot plant) for Australia's Victorian brown coal. In fiscal 1981, using the process concept and design data obtained through the study of elementary matters, a detailed design of a primary hydrogenation system is drawn, part of the equipment is procured, and on-site construction work is started. The book is a collection of materials which include engineering specifications related to electrical designs, lists of electrical items, specifications related to civil engineering designs, drawings such as planning drawings, and a detailed construction design drawn by an Australian engineering corporation and related documents and drawings. Concerning the manufacture of mechanical systems, items procurable in Japan, specifications of items procurable in Australia, lists, drawings, etc., are shown. Also included are the details of on-site preparation for construction and on-site work, conceptual designs of processes of dehydration, deashing, and secondary hydrogenation, etc. (NEDO)

  20. Qualitative analysis of coal combusted in boilers of the thermal power plants in Bosnia and Herzegovina

    Directory of Open Access Journals (Sweden)

    Đurić Slavko N.

    2012-01-01

    Full Text Available In this paper we have looked into the qualitative analysis of coals in Bosnia and Herzegovina (B-H. The analysis includes the following characteristics: moisture (W, ash (A, combustible matter (Vg and lower heating value (Hd. From the statistic parameters we have determined: absolute range (R, arithmetic mean (X, standard deviation (S and variations coefficient (Cv. It has been shown that the coal characteristics (W, A, Vg, Hd have normal distribution. The analysis show that there are considerable deviations of ash characteristics: moisture (36.23%, ash (34.21%, combustible matter (16.15% and lower heating value (25.16% from the mean value which is shown by the variations coefficient (Cv. Large oscilations of mass portions: W, A, Vg and Hd around the mean value can adversely influence the function of a boiler plant and an electric filter plant in thermal power plants in B-H in which the mentioned types of coal burn. Large ash oscilations (34.21% around the mean value point out to the inability of application of dry procedures of desulphurisation of smoke gasses (FGD due to the additional quantity of ash. It has been shown that the characteristics of Bosnian types of coal do not deviate a lot from the characteristics of coal in the surrounding countries (coals of Serbia and Monte Negro. The results can be used in analysis of coal combustion in thermal power plants, optimisation of electrical-filtre, reduction of SO2 in smoke gas and other practical problems.

  1. Fiscal 2000 achievement report. Development of coal gas production technology for fuel cells (Research using pilot test facility - for public release); 2000 nendo seika hokokusho (Kokai you). Nenryo denchi you sekitan gas seizo gijutsu kaihatsu - Pilot shiken setsubi ni yoru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the development of a coal gasification furnace optimum for fuel cells, research and development was conducted of a coal gas production technology using the oxygen-blown coal gasification technology, and the fiscal 2000 results are put together. In the construction of the pilot test facility, part of the road in the site was constructed as continued from the preceding fiscal year. In the construction of the coal gasification facility, some of the devices were built, which were the coal feeding system, coal gasification furnace, heat recovery boiler, and the char recovery device, and some of the thus-built devices and procured devices were installed. In the study of the control of the operation of the oxygen-blown coal gasification system, the pilot test facility was divided into unit devices and, for each of the unit devices, detailed procedures for pre-start preparation, start, stop, and for the stop of accessorise were deliberated, and important operating steps were worked out. Timing charts were prepared for the operation of each of the facilities during plant start/stop operations. In the effort to deal with serious accidents, special operation procedures were studied and prepared on the case-by-case basis. (NEDO)

  2. The natural radioactivity in vicinity of the brown coal mine Tusnica - Livno, BiH

    International Nuclear Information System (INIS)

    Saracevic, L.; Samek, D.; Mihalj, A.; Gradascevic, N.

    2009-01-01

    Coal mine Tusnica is located in South-West part of Bosnia and Herzegovina in the municipality Livno. Coal mine Tusnica consists of two surface coal mines. The first one is brown coal surface deposit called Drage and second one is lignite deposit called Table. The brown coal deposit shows increased levels of natural radionuclides. The highest absorbed dose rate is recorded in the center of the surface coal mine Tusnica-Drage (500 nGy h -1 ) as result of the increased content of uranium and radium in coal (average specific activity of U-238 is 623 ± 23 Bq kg -1 and Ra-226 is 1191 ± 5 Bq kg -1 ). Levels of natural radionuclides in the vicinity of the surface deposit Drage in agricultural soil (about 3 km of the centre mine) are slightly increased due to the use of the coal ash and coal dust for fertilization of the land (U-238 is 142 ± 11 Bq kg -1 and Ra-226 is 197 ± 2 Bq kg -1 ). Obtained results in soil-plant-animal products chain does not show significantly increased levels of natural radionuclides due to the fact that mentioned radionuclides, in general, have a low transfer factors in soil-plant-animal products chain. (author)

  3. Dissolution studies with pilot plant and actual INTEC calcines

    International Nuclear Information System (INIS)

    Herbst, R.S.; Garn, T.G.

    1999-01-01

    The dissolution of Idaho Nuclear Technology and Engineering Center (INTEC) pilot plant calcines was examined to determine solubility of calcine matrix components in acidic media. Two representatives pilot plant calcine types were studied: Zirconia calcine and Zirconia/Sodium calcine. Dissolution of these calcines was evaluated using lower initial concentrations of nitric acid than used in previous tests to decrease the [H+] concentration in the final solutions. Lower [H+] concentrations contribute to more favorable TRUEX/SREX solvent extraction flowsheet performance. Dissolution and analytical results were also obtained for radioactive calcines produced using high sodium feeds blended with non-radioactive Al(NO 3 ) 3 solutions to dilute the sodium concentration and prevent bed agglomeration during the calcination process. Dissolution tests indicated >95 wt.% of the initial calcine mass can be dissolved using the baseline dissolution procedure, with the exception that higher initial nitric acid concentrations are required. The higher initial acid concentration is required for stoichiometric dissolution of the oxides, primarily aluminum oxide. Statistically designed experiments using pilot plant calcine were performed to determine the effect of mixing rate on dissolution efficiency. Mixing rate was determined to provide minimal effects on wt.% dissolution. The acid/calcine ratio and temperature were the predominate variables affecting the wt.% dissolution, a result consistent with previous studies using other similar types of pilot plant calcines

  4. Integrating Waste Heat from CO2 Removal and Coal-Fired Flue Gas to Increase Plant Efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Irvin, Nick [Southern Company Services, Inc., Birmingham, AL (United States); Kowalczyk, Joseph [Southern Company Services, Inc., Birmingham, AL (United States)

    2017-04-01

    In project DE-FE0007525, Southern Company Services demonstrated heat integration methods for the capture and sequestration of carbon dioxide produced from pulverized coal combustion. A waste heat recovery technology (termed High Efficiency System) from Mitsubishi Heavy Industries America was integrated into an existing 25-MW amine-based CO2 capture process (Kansai Mitsubishi Carbon Dioxide Recovery Process®1) at Southern Company’s Plant Barry to evaluate improvements in the energy performance of the pulverized coal plant and CO2 capture process. The heat integration system consists of two primary pieces of equipment: (1) the CO2 Cooler which uses product CO2 gas from the capture process to heat boiler condensate, and (2) the Flue Gas Cooler which uses air heater outlet flue gas to further heat boiler condensate. Both pieces of equipment were included in the pilot system. The pilot CO2 Cooler used waste heat from the 25-MW CO2 capture plant (but not always from product CO2 gas, as intended). The pilot Flue Gas Cooler used heat from a slipstream of flue gas taken from downstream of Plant Barry’s air heater. The pilot also included a 0.25-MW electrostatic precipitator. The 25-MW High Efficiency System operated for approximately six weeks over a four month time period in conjunction with the 25-MW CO2 capture facility at Plant Barry. Results from the program were used to evaluate the technical and economic feasibility of full-scale implementation of this technology. The test program quantified energy efficiency improvements to a host power plant that could be realized due to the High Efficiency System. Through the execution of this project, the team verified the integrated operation of the High Efficiency System and Kansai Mitsubishi Carbon Dioxide Recovery Process®. The ancillary benefits of the High Efficiency System were also quantified, including reduced water consumption

  5. Relative radiation hazards of coal based and nuclear power plants

    International Nuclear Information System (INIS)

    Mishra, U.C.

    1983-04-01

    Coal, like most materials found in nature, contains trace quantities of naturally occurring radionuclides. However, low concentrations may become important if large quantities of coal are burnt in thermal power plants. Therefore a study was performed to determine the radioactivity in coal, in fly-ash and slag and assess the importance of radioactive emissions from thermal power plants. The results were compared to the radiological impact of nuclear power stations. Based on these data, theoretical estimates for the population living within 80km from power stations indicate that the collective dose commitments of coal-fired plants are one order of magnitude higher than those for BWR-type nuclear plants. Measurements taken in the vicinity of coal-fired plants were comparable to those for nuclear plants, i.e. within the range of variation of natural background radiation in India

  6. FY 1992 report on the Coal Liquefaction Committee; 1992 nendo sekitan ekika iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    The paper reported activities of the Coal Liquefaction Committee in FY 1992. In the 1st committee meeting, report/discussion were made of the summary of the FY 1992 R and D plan on the bituminous coal liquefaction, brown coal liquefaction and the common/basic technology. Further, the following were reported as topics: results of the operation by bituminous coal liquefaction PSU and small equipment, state of arrangement of the results of the brown coal liquefaction project, making of the basic policy for development of the common/basic technology, construction of package of coal liquefaction technology. In the 2nd committee meeting, the summary of the results of the FY 1992 R and D was reported/discussed. As to the development of bituminous coal liquefaction technology, study using pilot plant and support study were reported. Concerning the development of brown coal liquefaction technology, study using a 50t/d pilot plant and complementary study of operation. Relating to the development of the common/basic technology, trial manufacture/development of plant equipment/materials, survey of selection of coal kind, etc. The paper also reported a scheme on the evaluation of efficiency of the brown coal liquefaction process. (NEDO)

  7. Fault Detection in Coal Mills used in Power Plants

    DEFF Research Database (Denmark)

    Odgaard, Peter Fogh; Mataji, Babak

    2006-01-01

    In order to achieve high performance and efficiency of coal-fired power plants, it is highly important to control the coal flow into the furnace in the power plant. This means suppression of disturbances and force the coal mill to deliver the required coal flow, as well as monitor the coal mill...... in order to detect faults in the coal mill when they emerge. This paper deals with the second objective. Based on a simple dynamic model of the energy balance a residual is formed for the coal mill. An optimal unknown input observer is designed to estimate this residual. The estimated residual is following...... tested on measured data of a fault in a coal mill, it can hereby be concluded that this residual is very useful for detecting faults in the coal mill....

  8. BOILER MATERIALS FOR ULTRASUPERCRITICAL COAL POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    R. Viswanathan; K. Coleman

    2003-01-20

    The principal objective of this project is to develop materials technology for use in ultrasupercritical (USC) plant boilers capable of operating with 760 C (1400 F), 35 MPa (5000 psi) steam. In the 21st century, the world faces the critical challenge of providing abundant, cheap electricity to meet the needs of a growing global population while at the same time preserving environmental values. Most studies of this issue conclude that a robust portfolio of generation technologies and fuels should be developed to assure that the United States will have adequate electricity supplies in a variety of possible future scenarios. The use of coal for electricity generation poses a unique set of challenges. On the one hand, coal is plentiful and available at low cost in much of the world, notably in the U.S., China, and India. Countries with large coal reserves will want to develop them to foster economic growth and energy security. On the other hand, traditional methods of coal combustion emit pollutants and CO{sub 2} at high levels relative to other generation options. Maintaining coal as a generation option in the 21st century will require methods for addressing these environmental issues. This project has established a government/industry consortium to undertake a five-year effort to evaluate and develop of advanced materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 760 C, will increase the efficiency of coal-fired boilers from an average of 35% efficiency (current domestic fleet) to 47% (HHV). This efficiency increase will enable coal-fired power plants to generate electricity at competitive rates (irrespective of fuel costs) while reducing CO{sub 2} and other fuel-related emissions by as much as 29%. Success in achieving these objectives will support a number of broader goals. First, from a national prospective, the program will identify advanced materials that will make it possible to

  9. Radiation exposure potential from coal-fired power plants in Romania

    International Nuclear Information System (INIS)

    Botezatu, E.; Grecea, C.; Botezatu, G.; Capitanu, O.; Peic, T.; Sandor, G.

    1996-01-01

    In the investigated power plants they burn brown coal, lignite and/or mixture of different kinds of coal: brown coal, lignite, pit coal, pitch coal, bituminous coal. The activity concentrations measured in the coal samples varied over two orders of magnitude. The natural radionuclide concentrations in fly ash are significantly higher than the corresponding Concentrations in the coal. The normalized discharged activities for the investigated power plants are much higher than those estimated in the UNSCEAR 1988 Report for typical old and modern plants. Firstly, accounting for this is the low ash retention efficiency of the particulate control devices of power stations, especially for the older ones, and secondly, the high ash content of the coal: 26-60%. The low quality of coal leads to the higher coal consumption; thus the combustion of up to 20.109 Kg of coal is required to produce 1 Gwa of electrical energy. As a result, the activities of radon-222 and of radon-220 released per Gwa have been assessed at 25 to 770 GBq. (author)

  10. Report on the achievements in the projects subsidized by the Sunshine Project in fiscal 1981. Data 3. Development of a coal liquefaction technology - development of a solvent extraction and liquefaction technology - 'development of a brown coal based solvent extraction plant' (Development of a 50-t/d pilot plant); 1981 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho (shiryo 3). Yozai chushutsu ekika gijutsu no kaihatsu (kattankei yozai chushutsu plant no kaihatsu (50ton/nichi pilot plant no kaihatsu))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Developmental researches were carried out on a liquefaction plant for the Victoria brown coal produced in Australia (a 50-t/d pilot plant). In fiscal 1981, detailed design was performed on the primary hydrogenation system by using the process conception and the design data obtained in the element studies. Part of the devices was procured, and the site construction was begun. The present data is a collection of drawings in relation with the instrumentation design, such as the meter specifications, front view drawings for meter panels, drawings for panel arrangement in the central control room, a computer room layout drawing, control system explanation drawings, interlock diagrams, and the instrumentation power supply diagrams. (NEDO)

  11. Design and implementation of a field pilot study on using coal fly ash to prevent oxidation of reactive mine tailings

    Energy Technology Data Exchange (ETDEWEB)

    Wang, H.L.; Shang, J.Q.; Xu, Y.Q.; Yanful, E.K. [Western Ontario Univ., London, ON (Canada). Dept. of Civil and Environmental Engineering; Hmidi, N. [Goldcorp Inc., Musselwhite Mine, Thunder Bay, ON (Canada)

    2009-07-01

    This paper reported on a pilot scale study that investigated the feasibility of using coal fly ash in mine tailings management and acid mine drainage (AMD) treatment at Goldcorp's Musselwhite Mine site in northern Ontario. The principles and key aspects of the fly ash application in mine tailings management were described. Fly ash from the Atikokan coal-fired power generating plant was added to the Musselwhite tailings as a mixture as well as intermediate and top layers. The physical, chemical and hydrogeological effects of the two approaches were monitored. The paper provided details of the design, implementation, monitoring, sampling and testing over 2 years. The objectives were to evaluate the optimum mass ratio of coal fly ash and mine tailings, effectiveness in reducing the infiltration of precipitation, and projected long-term durability and performance on tailings oxidation prevention. The pilot study was designed based on the principles of cementitious materials formation and secondary mineral formation by the reactions of coal fly ash and water/AMD. Calcium oxide, aluminum oxide, silicon oxide, and ferric oxide are major components of coal fly ash. The preliminary test results revealed that water did not accumulate and cracks did not form on top of 4 tanks. The settlements of the mixing approaches were lower than that of the stratified approach and the temperature distributions in the 4 tanks were comparable. 9 refs., 3 tabs., 11 figs.

  12. Coal Moisture Estimation in Power Plant Mills

    DEFF Research Database (Denmark)

    Andersen, Palle; Bendtsen, Jan Dimon; Pedersen, Tom S.

    2009-01-01

    Knowledge of moisture content in raw coal feed to a power plant coal mill is of importance for efficient operation of the mill. The moisture is commonly measured approximately once a day using offline chemical analysis methods; however, it would be advantageous for the dynamic operation...... of the plant if an on-line estimate were available. In this paper we such propose an on-line estimator (an extended Kalman filter) that uses only existing measurements. The scheme is tested on actual coal mill data collected during a one-month operating period, and it is found that the daily measured moisture...

  13. Operational experience of electron beam flue gases treatment pilot installation at the Maritsa East 2 Thermal Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Dutskinov, N. [NEK-EAD (Bulgaria)

    2011-07-01

    The electron beam flue gases treatment process is very versatile and effective technology for simultaneous removal of acidic pollutants i.e. sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) from the flue gas produced in the combustion of fossil fuel. The technology allows decomposition of VOC (volatile organic compound) such as polycyclic aromatic compound (PAC) and persistent organic pollutants (POP). The electron beam flue gases treatment technology for combustion flue gases purification was applied in Maritsa-East 2 Thermal Power Plant. The decision for construction of Electron Beam Pilot Plant at Maritsa-East 2 TPP was taken at the technical meeting in IAEA Vienna, November 1998. The flue gases of 10 000 nm³/h are irradiated by three high energy electron accelerators of 800 keV and 35 kW beam power each. The plant has been operated since November 2003. The removal efficiency 90-99% for SO{sub x} and 85-90% for NO{sub x} was observed. The quality of coals are characterised with high ash content up to 45%, high moisture up to 57%, low calorific value from 1196 kcal/kg up to 1603 kcal/kg and high concentration of sulphur. The Bulgarian lignite coals are unique in their usage as fuel for the thermal power plants in Maritsa East region. (author)

  14. Solvent Refined Coal (SRC) process: trace elements. Research and development report No. 53, interim report No. 31, August 1976-July 1977. Volume III. Pilot plant development work. Part 6

    International Nuclear Information System (INIS)

    1980-03-01

    Results are presented on a study of the distribution and fate of 34 trace elements in the Solvent Refined Coal Process at the pilot plant located at Fort Lewis, Washington, and operated by The Pittsburg and Midway Coal Mining Co. under contract with the US Department of Energy. Neutron activation analysis was used to determine Ti, V, Ca, Mg, Al, Cl, Mn, As, Sb, Se, Hg, Br, Co, Ni, Cr, Fe, Na, Rb, Cs, K, Sc, Tb, Eu, Sm, Ce, La, Sr, Ba, Th, Hf, Ta, Ga, Zr, and Cu in feed coals, process solvent, Solvent Refined Coal (SRC), mineral residues, wet filter cake, by-product solvents, process and effluent waters and by-product sulfur. The sample points were chosen such that the major process streams were adequately described and that the major input and output materials were included. Atomic absorption spectrophotometry was used to measure the toxic elements Pb, Cd, Be in plant-derived solvents, effluent water and Hamer Marsh water. Specific methods were developed for analysis of a wide range of material compositions. The neutron activation analysis procedures were divided into short and long irradiation procedures for elements with short half lives (less than 3 hours) and intermediate to long half lives ( 8 hours to 5.2 years). Data are presented for a third equilibrium set of samples from the SRC-I process and compared to two similar sets analyzed previously. A material balance (or budget) was calculated for each element from the concentration data and the yields of each process fraction. Data are also presented on a study of carbon monoxide addition to the hydrogen stream and its effect on trace elements, and trace element data on a study of thirty-six plant effluent water samples taken during an SRC-I production run

  15. Study on the coal mixing ratio optimization for a power plant

    Science.gov (United States)

    Jin, Y. A.; Cheng, J. W.; Bai, Q.; Li, W. B.

    2017-12-01

    For coal-fired power plants, the application of blended coal combustion has been a great issue due to the shortage and rising prices of high-rank coal. This paper describes the optimization of blending methods between Xing'an lignite coal, Shaltala lignite coal, Ura lignite coal, and Inner Mongolia bituminous coal. The multi-objective decision-making method based on fuzzy mathematics was used to determine the optimal blending ratio to improve the power plant coal-fired economy.

  16. Environmental impact assessment of coal power plants in operation

    OpenAIRE

    Bartan Ayfer; Kucukali Serhat; Ar Irfan

    2017-01-01

    Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly as...

  17. Coal gasification plant

    Energy Technology Data Exchange (ETDEWEB)

    1977-09-29

    The proposal concerns a stage in the process of cooling the synthetic gas produced in a coal gasification plant at temperatures above 900/sup 0/C. The purpose is to keep the convection heating surface of the subsequent waste heat plant free of dirt. According to the invention, the waste heat plant has a radiation area connected before it, on the heating surfaces of which the slack carried over solidifies. This radiation area has a hydraulic and thermal cleaning system, which can be raised or lowered in a water bath. The subclaims concern all the constructional characteristics of this cleaning system, which causes the solidified slack to crack.

  18. Long term steam oxidation of TP 347H FG in power plants

    DEFF Research Database (Denmark)

    Hansson, Anette Nørgaard; Korcakova, Leona; Hald, John

    2005-01-01

    The long term oxidation behaviour of TP 347H FG at ultra supercritical steam conditions was assessed by exposing the steel in test superheater loops in a Danish coal-fired power plant. The steamside oxide layer was investigated with scanning electron microscopy and energy dispersive Xray diffract......The long term oxidation behaviour of TP 347H FG at ultra supercritical steam conditions was assessed by exposing the steel in test superheater loops in a Danish coal-fired power plant. The steamside oxide layer was investigated with scanning electron microscopy and energy dispersive Xray...

  19. CEZ utility's coal-fired power plants: towards a higher environmental friendliness

    International Nuclear Information System (INIS)

    Kindl, V.; Spilkova, T.; Vanousek, I.; Stehlik, J.

    1996-01-01

    Environmental efforts of the major Czech utility, CEZ a.s., are aimed at reducing air pollution arising from electricity and heat generating facilities. There are 3 main kinds of activity in this respect: phasing out of coal fired power plants; technological provisions to reduce emissions of particulate matter, sulfur dioxide, and nitrogen oxides from those coal fired units that are to remain in operation after 1998; and completion of the Temelin nuclear power plant. In 1995, emissions of particulate matter, sulfur dioxide, nitrogen oxides, and carbon monoxide from CEZ's coal fired power plants were 19%, 79%, 59%, and 60%, respectively, with respect to the situation in 1992. The break-down of electricity generation by CEZ facilities (in GWh) was as follows in 1995: hydroelectric power plants 1673, nuclear power plants 12230, coal fired power plants without desulfurization equipment 30181, and coal fired power plants with desulfurization equipment 2277. Provisions implemented to improve the environmental friendliness of the individual CEZ's coal fired power plants are described in detail. (P.A.). 5 tabs., 1 fig

  20. Corrosivities in a pilot-scale combustor of a British and two Illinois coals with varying chlorine contents

    Science.gov (United States)

    Chou, I.-Ming; Lytle, J.M.; Kung, S.C.; Ho, K.K.

    2000-01-01

    Many US boiler manufacturers have recommended limits on the chlorine (Cl) content (< 0.25% or < 0.3%) of coals to be used in their boilers. These limits were based primarily on extrapolation of British coal data to predict the probable corrosion behavior of US coals. Even though Cl-related boiler corrosion has not been reported by US utilities burning high-Cl Illinois coals, the manufacturer's limits affect the marketability of high-Cl Illinois coals. This study measured the relative rates of corrosion caused by two high-Cl coals (British and Illinois) and one low-Cl Illinois baseline coal under identical pilot-scale combustion conditions for about 1000 h which gave reliable comparisons. Temperatures used reflected conditions in boiler superheaters. The corrosion probes were fabricated from commercial alloy 304SS frequently used at the hottest superheater section of utility boilers. The results showed no evidence of direct correlation between the coal chlorine content and rate of corrosion. A correlation between the rate of corrosion and the metal temperature was obvious. The results suggested that the different field histories of corrosivity from burning high-Cl Illinois coal and high-Cl British coal occurred because of different metal temperatures operated in US and UK utility boilers. The results of this study can be combined into a database, which could be used for lifting the limits on chlorine contents of coals burned in utility boilers in the US.

  1. Thermal expansion of coking coals

    Energy Technology Data Exchange (ETDEWEB)

    Orlik, M.; Klimek, J. (Vyzkumny a Zkusebni Ustav Nova Hut, Ostrava (Czechoslovakia))

    1992-12-01

    Analyzes expansion of coal mixtures in coke ovens during coking. Methods for measuring coal expansion on both a laboratory and pilot plant scale are comparatively evaluated. The method, developed, tested and patented in Poland by the Institute for Chemical Coal Processing in Zabrze (Polish standard PN-73/G-04522), is discussed. A laboratory device developed by the Institute for measuring coal expansion is characterized. Expansion of black coal from 10 underground mines in the Ostrava-Karvina coal district and from 9 coal mines in the Upper Silesia basin in Poland is comparatively evaluated. Investigations show that coal expansion reaches a maximum for coal types with a volatile matter ranging from 20 to 25%. With increasing volatile matter in coal, its expansion decreases. Coal expansion increases with increasing swelling index. Coal expansion corresponds with coal dilatation. With increasing coal density its expansion increases. Coal mixtures should be selected in such a way that their expansion does not cause a pressure exceeding 40 MPa. 11 refs.

  2. Pilot test of flue gas treatment by electron beam

    International Nuclear Information System (INIS)

    Tokunaga, Okihiro

    1995-01-01

    The development of the technology of the desulfurization and denitration for flue gas by using electron beam was started in Japan in 1970s, and since then, the development research for putting it to practical use and the basic research on the subjects which must be resolved for promoting the practical use have been advanced. Based on these results, the verifying test using a pilot scale plant was carried out from 1991 to 1994 for the treatment of coal-burning flue gas, municipal waste-burning flue gas and highway tunnel exhaust gas. The operation of the pilot plant was already finished, and the conceptual design of a practical scale plant based on the results and the assessment of the economical efficiency were performed. As for the coal-burning flue gas treatment by using electron beam, the basic test, the pilot test and the conceptual design of a practical scale plant and the assessment of the economical efficiency are reported. As for the municipal waste-burning flue gas treatment by using electron beam, the basic test and the pilot test are reported. Also the pilot test on the denitration of exhaust gas in highway tunnels in reported. In Poland, the pilot test on the treatment of flue gas in coal-burning thermal power stations is carried out. In Germany, the technical development for cleaning the air contaminated by volatile organic compounds by electron beam irradiation is advanced. (K.I.)

  3. Development, testing, and demonstration of an optimal fine coal cleaning circuit

    International Nuclear Information System (INIS)

    Mishra, M.; Placha, M.; Bethell, P.

    1995-01-01

    The overall objective of this project is to improve the efficiency of fine coal cleaning. The project will be completed in two phases: bench-scale testing and demonstration of four advanced flotation cells and; in-plant proof-of-concept (POC) pilot plant testing of two flotation cells individually and in two-stage combinations. The goal is to ascertain if a two-stage circuit can result in reduced capital and operating costs while achieving improved separation efficiency. The plant selected for this project, Cyprus Emerald Coal Preparation plant, cleans 1200 tph of raw coal. The plant produces approximately 4 million tonnes of clean coal per year at an average as received energy content of 30.2 MJ/Kg (13,000 Btu/lb)

  4. Development, testing, and demonstration of an optimal fine coal cleaning circuit

    Energy Technology Data Exchange (ETDEWEB)

    Mishra, M.; Placha, M.; Bethell, P. [and others

    1995-11-01

    The overall objective of this project is to improve the efficiency of fine coal cleaning. The project will be completed in two phases: bench-scale testing and demonstration of four advanced flotation cells and; in-plant proof-of-concept (POC) pilot plant testing of two flotation cells individually and in two-stage combinations. The goal is to ascertain if a two-stage circuit can result in reduced capital and operating costs while achieving improved separation efficiency. The plant selected for this project, Cyprus Emerald Coal Preparation plant, cleans 1200 tph of raw coal. The plant produces approximately 4 million tonnes of clean coal per year at an average as received energy content of 30.2 MJ/Kg (13,000 Btu/lb).

  5. Strength and corrosion behavior of SiC - based ceramics in hot coal combustion environments

    Energy Technology Data Exchange (ETDEWEB)

    Breder, K.; Parten, R.J. [Oak Ridge National Lab., TN (United States)

    1996-08-01

    As part of an effort to evaluate the use of advanced ceramics in a new generation of coal-fired power plants, four SiC-based ceramics have been exposed to corrosive coal slag in a laboratory furnace and two pilot scale combustors. Initial results indicate that the laboratory experiments are valuable additions to more expensive pilot plant experiments. The results show increased corrosive attack with increased temperature, and that only slight changes in temperature may significantly alter the degree of strength degradation due to corrosive attack. The present results are part of a larger experimental matrix evaluating the behavior of ceramics in the coal combustion environment.

  6. Evaluation criteria for enhanced solar–coal hybrid power plant performance

    International Nuclear Information System (INIS)

    Zhao, Yawen; Hong, Hui; Jin, Hongguang

    2014-01-01

    Attention has been directed toward hybridizing solar energy with fossil power plants since the 1990s to improve reliability and efficiency. Appropriate evaluation criteria were important in the design and optimization of solar–fossil hybrid systems. Two new criteria to evaluate the improved thermodynamic performances in a solar hybrid power plant were developed in this study. Correlations determined the main factors influencing the improved thermodynamic performances. The proposed criteria can be used to effectively integrate solar–coal hybridization systems. Typical 100 MW–1000 MW coal-fired power plants hybridized with solar heat at approximately 300 °C, which was used to preheat the feed water before entering the boiler, were evaluated using the criteria. The integration principle of solar–coal hybrid systems was also determined. The proposed evaluation criteria may be simple and reasonable for solar–coal hybrid systems with multi-energy input, thus directing system performance enhancement. - Highlights: • New criteria to evaluate the solar hybrid power plant were developed. • Typical solar–coal hybrid power plants were evaluated using the criteria. • The integration principle of solar–coal hybrid systems was determined. • The benefits of the solar–coal hybrid system are enhanced at lower solar radiation

  7. Studies of materials found in products and wastes from coal-conversion processes

    International Nuclear Information System (INIS)

    Petersen, M.R.; Fruchter, J.S.

    1979-01-01

    Researchers at Pacific Northwest Laboratory (PNL) have been investigating materials from synthetic fossil-fuel processes. During this past year, solids from the Lignite Gasification Pilot Plant and samples from the Solvent Refined Coal Pilot Plant (SRC-II mode) have been analyzed for organic and inorganic constituents. Observations on these samples are summarized

  8. Solvent-refined-coal (SRC) process. Volume II. Sections V-XIV. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    This report documents the completion of development work on the Solvent Refined Coal Process by The Pittsburgh and Midway Coal Mining Co. The work was initiated in 1966 under Office of Coal Research, US Department of Interior, Contract No. 14-01-0001-496 and completed under US Department of Energy Contract No. DE-AC05-79ET10104. This report discusses work leading to the development of the SRC-I and SRC-II processes, construction of the Fort Lewis Pilot Plant for the successful development of these processes, and results from the operation of this pilot plant. Process design data generated on a 1 ton-per-day Process Development Unit, bench-scale units and through numerous research projects in support of the design of major demonstration plants are also discussed in summary form and fully referenced in this report.

  9. Development of melting system using oxy-coal combustion; Sekitan chokusetsu riyo kinzoku yoyu system gijutsu (NSR) (pilot setsubi unten jokyo ni tsuite)

    Energy Technology Data Exchange (ETDEWEB)

    Sugiyama, T [Center for Coal Utilization, Japan, Tokyo (Japan); Suwa, T; Kobayashi, N; Iino, K; Yamamoto, Y; Igarashi, H [Nippon Sanso K.K., Tokyo (Japan)

    1996-09-01

    This metal melting system is a process to efficiently melt and regenerate scraps of aluminum, copper and iron by utilizing high-temperature energy obtained from pulverized coal-oxygen combustion. The process is intended to utilize coal in place of petroleum for reduced fuel cost. Joint studies have been carried out as a subsidy operation of the Agency of Natural Resources and Energy with a schedule of six years starting fiscal 1992. Development tests are being performed using a 5-ton/ch pilot plant facility since fiscal 1995 after having gone through experiments using a 1-ton/ch bench scale furnace. This paper reports the results obtained to date. Using the pilot plant facility, fiscal 1995 has achieved the initial target values, such as thermal efficiency of 55% or higher, and yield of 96% or higher for non-ferrous metals and 94% or higher for iron. The melting behavior in the furnace has improved the thermal efficiency as a whole by retaining the conditions in the preheating step for an extended period of time. The thermal efficiency has been improved better than with the bench furnace as a result of upscaling effect. 9 figs., 3 tabs.

  10. Prototype plant for nuclear process heat (PNP), reference phase

    International Nuclear Information System (INIS)

    Fladerer, R.; Schrader, L.

    1982-07-01

    The coal gasification processes using nuclear process heat being developed within the framwork of the PNP project, have the advantages of saving feed coal, improving efficiency, reducing emissions, and stabilizing energy costs. One major gasification process is the hydrogasification of coal for producing SNG or gas mixture of carbon monoxide and hydrogen; this process can also be applied in a conventional route. The first steps to develop this process were planning, construction and operation of a semi-technical pilot plant for hydrogasification of coal in a fluidized bed having an input of 100 kg C/h. Before the completion of the development phase (reference phase) describing here, several components were tested on part of which no operational experience had so far been gained; these were the newly developed devices, e.g. the inclined tube for feeding coal into the fluidized bed, and the raw gas/hydrogenation gas heat exchanger for utilizing the waste heat of the raw gas leaving the gasifier. Concept optimizing of the thoroughly tested equipment parts led to an improved operational behaviour. Between 1976 and 1980, the semi-technical pilot plant was operated for about 19,400 hours under test conditions, more than 7,400 hours of which it has worked under gasification conditions. During this time approx. 1,100 metric tons of dry brown coal and more than 13 metric tons of hard coal were gasified. The longest coherent operational phase under gasification conditions was 748 hours in which 85.4 metric tons of dry brown coal were gasified. Carbon gasification rates up to 82% and methane contents in the dry raw gas (free of N 2 ) up to 48 vol.% were obtained. A detailed evaluation of the test results provided information of the results obtained previously. For the completion of the test - primarily of long-term tests - the operation of the semi-technical pilot plant for hydrogasification of coal is to be continued up to September 1982. (orig.) [de

  11. Study experimental of the combustion of coal in grill

    International Nuclear Information System (INIS)

    Chejne j, Farid; Florez E, Whady and others

    1997-01-01

    In this article, experiments in which the temperature of the bed and emissions in the combustion chamber were registered were carried out in pilot plant. Also proximate analyses of coal sizing over the average of unburned carbon was studied in pilot plant and industrial boilers. Finally, graphics of CO vs O2, Nox vs temperature and Sox vs temperature were analyzed in order to determinate their kinetic behavior

  12. Recovering uranium from coal in-situ. Final report, February 1980-July 1981

    International Nuclear Information System (INIS)

    1981-01-01

    In Situ Technology, Inc., ''InTech,'' has designed a new process for recovery of uranium from coal in situ. Prime objectives of the program reported herein are to reduce two uncertainties related to eventual commercialization of the process. The first uncertainty concerns appropriate field sites and their potential. The work involved laboratory tests and analysis of field samples, burning the samples to ash and leaching uranium from residual ash at laboratory scale, and burning the samples to ash and leaching uranium from residual ash at pilot plant scale. Laboratory and pilot plant tests were designed to simulate significant elements of the underground process. Field samples from New Mexico averaged 0.061% U 3 O 8 and from North Dakota 0.058% of U 3 O 8 in the coal, both on a dry basis. Phase I laboratory tests on New Mexico field samples were successfully conducted with no difficulties in reducing uraniferous coal to ash. Leaching tests resulted in uranium recoveries to 77.9% with acid leach and to 56% with alkaline leach. Phase II laboratory and pilot plant scale tests were successfully conducted on North Dakota field samples, but required supplemental fuel and/or enrichment for reducing uraniferous coal to ash. Acid leaching of residual ash resulted in uranium recoveries to 83.8%. Acid consumption was 71.0 pounds per ton during pilot plant scale leaching tests. The overall analysis and test program is considered to be highly successful and resulted in significant reduction of the uncertainties for eventual commercialization of the process. 3 refs

  13. Prospects for the development of coal-steam plants in Russia

    Science.gov (United States)

    Tumanovskii, A. G.

    2017-06-01

    Evaluation of the technical state of the modern coal-fired power plants and quality of coal consumed by Russian thermal power plants (TPP) is provided. Measures aimed at improving the economic and environmental performance of operating 150-800 MW coal power units are considered. Ways of efficient use of technical methods of NO x control and electrostatic precipitators' upgrade for improving the efficiency of ash trapping are summarized. Examples of turbine and boiler equipment efficiency upgrading through its deep modernization are presented. The necessity of the development and introduction of new technologies in the coal-fired power industry is shown. Basic technical requirements for a 660-800 MW power unit with the steam conditions of 28 MPa, 600/600°C are listed. Design solutions taking into account features of Russian coal combustion are considered. A field of application of circulating fluidized bed (CFB) boilers and their effectiveness are indicated. The results of development of a new generation coal-fired TPP, including a steam turbine with an increased efficiency of the compartments and disengaging clutch, an elevated steam conditions boiler, and a highly efficient NO x /SO2 and ash particles emission control system are provided. In this case, the resulting ash and slag are not to be sent to the ash dumps and are to be used to a maximum advantage. Technical solutions to improve the efficiency of coal gasification combined cycle plants (CCP) are considered. A trial plant based on a 16 MW gas turbine plant (GTP) and an air-blown gasifier is designed as a prototype of a high-power CCP. The necessity of a state-supported technical reequipment and development program of operating coal-fired power units, as well as putting into production of new generation coal-fired power plants, is noted.

  14. Corrosion protection pays off for coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, T.

    2006-11-15

    Zinc has long been used to hot-dip galvanise steel to deliver protection in harsh environments. Powder River Basin or eastern coal-fired plants benefit from using galvanized steel for conveyors, vibratory feeders, coal hoppers, chutes, etc. because maintenance costs are essentially eliminated. When life cycle costs for this process are compared to an alternative three-coal paint system for corrosion protection, the latter costs 5-10 times more than hot-dip galvanizing. An AEP Power Plant in San Juan, Puerto Rico and the McDuffie Coal Terminal in Mobile, AL, USA have both used hot-dip galvanized steel. 1 fig., 1 tab.

  15. Central Heating Plant Coal Use Handbook. Volume 1: Technical Reference.

    Science.gov (United States)

    1996-11-01

    CHUTES LIFT TRUCKS MONORAILS , TRAMWAYS J p WEIGHING, 0 MEASURING SCALES COAL METERS HOPPERS SAMPLERS 9 FIRING EQUIPMENT (Source: Power, February...Defense (DOD) installations employ coal- fired central energy plants, the U.S. Army Construction Engineering Research Laboratories (USACERL) was... fired central heat plant operations cost by improving coal quality specifications. The Handbook is tailored for military installation industrial

  16. Income risk of EU coal-fired power plants after Kyoto

    International Nuclear Information System (INIS)

    Abadie, Luis M.; Chamorro, Jose M.

    2009-01-01

    Coal-fired power plants enjoy a significant advantage relative to gas plants in terms of cheaper fuel cost. This advantage may erode (or turn into disadvantage) depending on CO 2 emission allowance price. Financial risks are further reinforced when the price of electricity is determined by natural gas-fired plants' marginal costs. We aim to empirically assess the risks in EU coal plants' margins up to the year 2020. Parameter values are derived from actual market data. Monte Carlo simulation allows compute the expected value and risk profile of coal plants' earnings. Future allowance prices may spell significant risks on utilities' balance sheets. (author)

  17. Relative population exposures from coal-fired and nuclear power plants in India

    Energy Technology Data Exchange (ETDEWEB)

    Ramachandran, T.V.; Lalit, B.Y.; Mishra, U.C.

    1987-01-01

    Coal combustion for electric power generation results in dispersal of fly ash, and hence an additional radiation dose to the population living in the neighbourhood of the coal-fired power plants due to natural radioactivity present in coal. The radiation hazards of coal based and nuclear power plants operating in India are given. The dose commitments to the population living within an 88.5 km radius of the thermal and nuclear power plants in India have been computed using the method outlined in an ORNL report. The estimated dose rates for these two types of power plant were compared. The present study shows that the radiation dose from coal-fired and nuclear power plants are comparable.

  18. Natural radionuclides in coal and waste material originating from coal fired power plant

    International Nuclear Information System (INIS)

    Marovic, Gordana; Franic, Zdenko; Sencar, Jasminka; Petrinec, Branko; Bituh, Tomislav; Kovac, Jadranka

    2008-01-01

    This paper presents long-term investigations of natural radioactivity in coal, used for power production in the coal-fired power plant (CFPP) situated on the Adriatic coast, and resulting slag and ash. Activity concentrations of 40 K, 232 Th, 226 Ra and 238 U in used coal and resulting waste material have been measured for 25 years. As expected, it was demonstrated that the content of radionuclides in deposited bottom and filter ash material are closely related with radionuclide activity concentrations and mineral matter fraction in used coals. The external hazard index has been calculated and discussed for the slag and ash depository. During the first decade of operation of the CFPP has been used domestic coal produced in nearby area characterized by higher background radiation compared with the rest of Croatia. Therefore, the coal itself had relatively high 226 Ra and 238 U activity concentrations while potassium and thorium content was very low, 40 K activity concentrations being 2-9% and those of 232 Th 1-3% of total activity. As, in addition, the sulphur concentrations in coal were very high use of domestic coal was gradually abandoned till it was completely substituted by imported coal originated from various sources and of low natural radioactivity. Upon this, activity concentrations of uranium series radionuclides in deposited waste materials decreased significantly. Consequently, waste material i.e., slag and ash, generated in the last several years of coal fired power plant operation could be readily used in cement industry and as additive to other building materials, without any special restrictions according to the Croatian regulations dealing with building materials and European directives. (author)

  19. Direct energy balance based active disturbance rejection control for coal-fired power plant.

    Science.gov (United States)

    Sun, Li; Hua, Qingsong; Li, Donghai; Pan, Lei; Xue, Yali; Lee, Kwang Y

    2017-09-01

    The conventional direct energy balance (DEB) based PI control can fulfill the fundamental tracking requirements of the coal-fired power plant. However, it is challenging to deal with the cases when the coal quality variation is present. To this end, this paper introduces the active disturbance rejection control (ADRC) to the DEB structure, where the coal quality variation is deemed as a kind of unknown disturbance that can be estimated and mitigated promptly. Firstly, the nonlinearity of a recent power plant model is analyzed based on the gap metric, which provides guidance on how to set the pressure set-point in line with the power demand. Secondly, the approximate decoupling effect of the DEB structure is analyzed based on the relative gain analysis in frequency domain. Finally, the synthesis of the DEB based ADRC control system is carried out based on multi-objective optimization. The optimized ADRC results show that the integrated absolute error (IAE) indices of the tracking performances in both loops can be simultaneously improved, in comparison with the DEB based PI control and H ∞ control system. The regulation performance in the presence of the coal quality variation is significantly improved under the ADRC control scheme. Moreover, the robustness of the proposed strategy is shown comparable with the H ∞ control. Copyright © 2017. Published by Elsevier Ltd.

  20. Fiscal 1994 achievement report. Development of entrained bed coal gasification power plant (Part 5 - Survey of demonstration plant); 1994 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 5. Jissho plant ni kansuru chosa kenkyu hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    A survey was conducted of a demonstration plant for developing the technology of integrated coal gasification combined cycle power generation. In fiscal 1994, based on the studies of pilot plant operation conducted up to the preceding fiscal year and on the studies of a demonstration plant (conceptual design of a demonstration plant), systems were examined for still higher performance and economical efficiency. For optimizing the heat source for pulverized coal drying air, an extracted air heat utilizing system was adopted, excellent in performance (approximately 0.5% improvement in absolute value) and in economical efficiency. For reducing the consumption of inert gas for the fluidized bed desulfurization facility, an approximately 30% reduction was found to be possible dependent on gas regeneration conditions in the regeneration tower. For performance improvement with the combined cycle equipment placed under a partial load, the generating-end efficiency was improved approximately 0.2% when only SGC (syngas cooler) was loaded 80% or less and kept at a constant pressure. Studies were also made about how to maintain a constant output with the equipment exposed to air temperature changes. (NEDO)

  1. The future of integrated coal gasification combined cycle power plants

    International Nuclear Information System (INIS)

    Mueller, R.; Termuehlen, H.

    1991-01-01

    This paper examines the future of integrated coal gasification combined cycle (IGCC) power plants as affected by various technical, economical and environmental trends in power generation. The topics of the paper include a description of natural gas-fired combined cycle power plants, IGCC plants, coal gasifier concepts, integration of gasifiers into combined cycle power plants, efficiency, environmental impacts, co-products of IGCC power plants, economics of IGCC power plants, and a review of IGCC power plant projects

  2. Studies on the hydroprocessing of deashed oil. 10. ; Comparison of the reaction performance between pilot plant and BSU. Deashed oil no suisoka bunkai hanno ni kansuru kenkyu. 10. ; Pilot to bench hanno sochi no hanno tokusei no hikaku

    Energy Technology Data Exchange (ETDEWEB)

    Hijiriyama, M.; Kaneko, T. (Mitsubishi Kasei Co., Tokyo (Japan)); Kageyama, Y. (Nippon Brown Coal Liquefaction Co. Ltd., Tokyo (Japan))

    1990-11-29

    The secondary hydroprocessing process in the two-stage hydrogenating liquefaction equipment under development at Nippon Brown Coal Liquefaction Company uses a fixed bed system. This paper describes operation of a bench reaction equipment using catalyst used in the pilot plant to compare it with fresh catalyst, and compare characteristics of the bench scale equipment with those of the pilot reactor. The catalyst is Ca-Ni-No/Al2O. The reaction was carried out in a gas-liquid downward parallel-flow fixed-bed reactor using deashed oil (DAO) with the same material as that used in the pilot plant and the same equilibrium solvent. The experiment result indicates that the used catalyst had its activity fallen below the fresh catalyst, but its temperature dependence was identical, and the selectivity on products of both catalysts was also identical. The result of reactions in the bench scale equipment clarified that the relationship between the DAO conversion rate and denitrogenation activity and the relationship between fa and H/C in the products are in good agreement, and that there is no difference in reaction selectivity. 5 refs., 6 figs., 1 tab.

  3. Waste generation comparison: Coal-fired versus nuclear power plants

    International Nuclear Information System (INIS)

    LaGuardia, T.S.

    1998-01-01

    Low-level radioactive waste generation and disposal attract a great deal of attention whenever the nuclear industry is scrutinized by concerned parties, be it the media, the public, or political interests. It is therefore important to the nuclear industry that this issue be put into perspective relative to other current forms of energy production. Most of the country's fossil-fueled power comes from coal-fired plants, with oil and gas as other fuel sources. Most of the generated waste also comes from coal plants. This paper, therefore, compares waste quantities generated by a typical (1150-MW(electric)) pressurized water reactor (PWR) to that of a comparably sized coal-fired power plant

  4. Dustfall design of open coal yard in the power plant-a case study on the closed reconstruction project of coal storage yard in shengli power plant

    Science.gov (United States)

    Wang, Kunpeng; Ji, Weidong; Zhang, Feifei; Yu, Wei; Zheng, Runqing

    2018-02-01

    This thesis, based on the closed reconstruction project of the coal storage yard of Shengli Power Plant which is affiliated to Sinopec Shengli Petroleum Administration, first makes an analysis on the significance of current dustfall reconstruction of open coal yard, then summarizes the methods widely adopted in the dustfall of large-scale open coal storage yard of current thermal power plant as well as their advantages and disadvantages, and finally focuses on this project, aiming at providing some reference and assistance to the future closed reconstruction project of open coal storage yard in thermal power plant.

  5. Report on 1977 result of Sunshine Project. Test research for detailed design of coal gasification plant (pressure fluidized gasification method for mixed material of coal/heavy oil); 1977 nendo sekitan gas ka plant no shosai sekkei no tame no shiken kenkyu seika hokokusho. Sekitan jushitsuyu kongo genryo no kaatsu ryudo gas ka hoshiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-03-31

    Since fiscal 1974, development has been implemented for the coal/heavy oil hybrid gasification process which converts coal and heavy oil simultaneously to clean fuel gas. With the purpose of obtaining basic data to be reflected on the detailed design of 7,000 Nm{sup 3}/d pilot plant of the subject process started in fiscal 1977, implemented this year were (1) test on high pressure valves and (2) research on operation studies. In (1), a life test device for high pressure operation valves will be designed and manufactured so that basic materials may be obtained for the development of durable operation valves to be used in a high temperature and high pressure coal/heavy oil slurry feeding device. Operation studies of a low pressure slurry feeding device will be continued, accumulating data required for the design of the coal/heavy oil slurry feeding device. In (2), studies will be started on the operation of a 300{phi}(diameter) internal heat type low pressure gasification device, collecting know-how for the model and design of the gasification furnace of the pilot plant. Gasification experiments will be continued using the high pressure gasification device, so that gasification characteristics under a high pressure will be grasped to examine the optimization of gasification conditions. In addition, a fluidized bed quencher test equipment will be designed and manufactured. (NEDO)

  6. Response of plant species to coal-mine soil materials

    Energy Technology Data Exchange (ETDEWEB)

    Day, A.D.; Tucker, T.C.; Thames, J.L.

    1983-03-01

    The two-year Black Mesa Coal Mine Research Study on the area near Kayenta, Arizona investigating the growth and establishment of seven plant species in unmined soil and coal-mined soils found that plant species grew better in unmined soil and that irrigation is essential during seedling establishment for the effective stabilization of coal-mined soils in a semi-arid environment. Differences among the species included variations in germination, response to irrigation, seedling establishment, and stem growth. 12 references, 2 figures, 2 tables.

  7. FY 1991 report on the results of the development of an entrained bed coal gasification power plant. Part 3. Adjustment of the operation test of pilot plant (1/2); 1991 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant unten shiken chosei hen (1/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-01-01

    The adjustment was made of the operation test of the 200 t/d entrained bed coal gasification pilot plant that was constructed with the aim of establishing technology of the integrated coal gasification combined cycle power generation, and the results were reported. As to the adjustment of the operation test of gasifier facilities, the light-oil firing test and tests of RUN 1-9 were conducted, and the paper reported cases of 49-item troubles, the causes, measures against them, improvement of facilities, etc. For slagging, operation conditions, improvement of various facilities, etc. were studied. Relating to the adjustment of the operation test of gas refining facilities (dry desulfurization facilities), the following were carried out: test on empty column gas circulation, test on desulfurizer circulation characteristics, test on SO2 reduction tower, test on warming-up characteristics, tests 1-3 on initial performance, tests on change in gas turbine fuel and loads. And, 21 cases of troubles, the causes and measures against them were reported. Concerning the adjustment of the operation test of gas refining facilities (dry dedusting facilities), the following were conducted: test on non-load sequence, test on confirmation prior to letting gas through, tests 1-3 on initial performance, test on dedusting characteristics. And, 22 cases of troubles, the causes and measures against them were reported. (NEDO)

  8. Report on the bituminous coal liquefaction sub-committee in fiscal 1993; 1993 nendo rekiseitan ekika bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    This paper reports the activities of the bituminous coal liquefaction sub-committee in fiscal 1993. With an intention of developing a technology on the process (NEDOL) suitable for liquefaction of wide range of coal types placing sub-bituminous coal at the center, researches were carried out by using a pilot plant, and engineering data purposed for practical application of the technology were acquired. The construction of the pilot plant, launched in fiscal 1991, will be performed under the operation research plan for efficient operation, based on the result of discussing the total project cost in fiscal 1992. The status of constructing the 150-t/d pilot plant in fiscal 1993 is in the phase of making the foundations subsequently from fiscal 1992, procurement of devices and construction materials, constructions of iron structures, installation, heat insulation, and painting, and building the central control building and piping facilities outside the battery limit. The paper also reports the tests and investigations on improving performance of natural pylite catalyst, the tests and investigations on improving performance of circulating solvent, and the technological investigations on structuring a liquefying reaction data analyzing system. For the supportive researches on the pilot plant, the paper describes studies by using a 1-t/d PSU, studies on coal liquefaction conditions, studies on synthesized iron sulfide catalysts, and studies on solvent hydrogenating catalysts. A comprehensive discussion was also given. (NEDO)

  9. Wet treatment of low-quality coal. II stage. Pilot Plant; Tratamiento en fase humeda de carbones de baja calidad 2 fase: planta piloto

    Energy Technology Data Exchange (ETDEWEB)

    1999-09-01

    At this second stage, the project was aimed at determining the appropriate operating conditions which permit the use of slack with a high ratio of inert materials after a treatment by means of wet oxidation at thigh pressure as well as carrying out an economic feasibility study. Based on the conclusions of the first stage, four representative samples were selected and the pilot plant for testing the influence of different process variables was designed. Continuous tests were conducted and the basic engineering was determined (process diagram, material, energy and equipment balances). An economic analysis for the erecting of an industrial plant for the treatment of low-quality coal using this technology was also carried out in order to establish whether a short-term or medium-term profitability of the required investment for the erecting could be achieved. It can be deduced from both the theoretical and experimental studies carried out that the technology of wet oxidation can be applied to the treatment of slacks, but the energetic efficiency of the reaction is so low that its use is not advisable for the proposed purposes. (Author)

  10. Status of steam gasification of coal by using heat from high-temperature reactors (HTRs)

    International Nuclear Information System (INIS)

    Schroeter, H.J.; Kirchhoff, R.; Heek, K.H. van; Juentgen, H.; Peters, W.

    1984-01-01

    Bergbau-Forschung GmbH, Essen, is developing a process for steam gasification of coal by using process heat from high-temperature nuclear reactors (HTRs). The envisaged allothermal gas generator is heated by an internally mounted bundle of heat exchanging tubes through which the gaseous reactor coolant helium flows. Research and development work for this process has been under way for about 11 years. After intensive small-scale investigations the principle of the process was tested in a semi-technical plant with 0.2 t/h coal throughput. In its gasifier a fluidized bed of approximately 1 m 2 cross-section and up to 4 m high is operated at 40 bar. Heat is supplied to the bed from an immersed heat exchanger with helium flowing through it. The gas generator is a cut-out version of the full-scale generator, in which the height of the bed, and the arrangement of the heat-exchanger tubes correspond to the full-scale design. The semi-technical plant has now achieved a total gasification time of about 13,000 hours. Roughly 2000 t of coal have been put through. During recent years the gasification of Federal German coking coal by using a jet-feeding system was demonstrated successfully. The results, confirmed and expanded by material tests for the heat exchanger, engineering and computer models and design studies, have shown the feasibility of nuclear steam gasification of coal. The process described offers the following advantages compared with existing processes: higher efficiency as more gas can be produced from less coal; less emission of pollutants as, instead of a coal-fired boiler, the HTR is used for producing steam and electricity; lower production costs for gas. The next step in the project is a pilot plant of about 2-4 t/h coal throughput, still with non-nuclear heating, to demonstrate the construction and operation of the allothermal gas generator on a representative scale for commercial applications. (author)

  11. Coal-Fired Power Plant Heat Rate Reductions

    Science.gov (United States)

    View a report that identifies systems and equipment in coal-fired power plants where efficiency improvements can be realized, and provides estimates of the resulting net plant heat rate reductions and costs for implementation.

  12. Cleaning up coal-fired plants : multi-pollutant technology

    Energy Technology Data Exchange (ETDEWEB)

    Granson, E.

    2009-06-15

    Coal is the source of 41 per cent of the world's electricity. Emission reduction technologies are needed to address the rapid growth of coal-fired plants in developing countries. This article discussed a multi-pollutant technology currently being developed by Natural Resources Canada's CANMET Energy Technology Centre. The ECO technology was designed to focus on several types of emissions, including sulfur oxides (SOx), nitrogen oxides (NOx), mercury and particulates, as well as acid gases and other metals from the exhaust gas of coal-fired plants. The ECO process converts and absorbs incoming pollutants in a wet electrostatic precipitator while at the same time producing a valuable fertilizer. The ECO system is installed as part of the plant's existing particulate control device and treats flue gas in 3 process steps: (1) a dielectric barrier discharge reactor oxidizes gaseous pollutants to higher oxides; (2) an ammonia scrubber then removes sulfur dioxide (SO{sub 2}) not converted by the reactor while also removing the NOx; and (3) the wet electrostatic precipitator captures acid aerosols produced by the discharge reactor. A diagram of the ECO process flow was included. It was concluded that the systems will be installed in clean coal plants by 2015. 2 figs.

  13. Study of the Radiological Impact of the Coal Fired Power Plants on the Environment. The As Pontes coal-fired Power Plant

    International Nuclear Information System (INIS)

    Cancio, D.; Robles, B.; Mora, J. C.

    2009-01-01

    As part of the Study carried out to determine the radiological impact of the four main Spanish coal-fired power plants, the Study on the As Pontes Coal-Fired Coal Power Plant was finalized. In the Report containing the study are included every measurement performed, as well as the modelling and evaluations carried out in order to assess the radiological impact. The general conclusion obtained is that under a radiological point of view, the impact of this installation on the public and the environment is very small. Also the radiological impact on the workers of the installation was assessed, obtaining too very small increases over the natural background. (Author) 61 refs.

  14. Energy options and the role of coal: an integrated approach

    Energy Technology Data Exchange (ETDEWEB)

    Isaacs, E. [Alberta Energy Research Institute, Edmonton, AB (Canada)

    2006-07-01

    Considers energy goals and options with particular regard to providing affordable energy to Canada. Gasification of coal and carbon to provide a reliable source of clean power and heat to the oil sand industry and for feedstocks for the production of fertilizer, methanol, petrochemicals, and ultra-clean fuels is examined. The layout for integrated gasification polygeneration with carbon feed and plans for Canada's first commercial gasification plant (the Nexen Long Lake Project) are shown in diagrams. Progress in coal gasification at a clean coal Luscar/Sherritt pilot plant is outlined. Clean coal technology is part of a strategy to provide integration across energy systems, generate value for all hydrocarbon resources, and minimize emissions. 15 figs., 2 tabs.

  15. Estimation of environmental external costs between coal fired power plant and nuclear power plant

    International Nuclear Information System (INIS)

    Moon, G. H.; Kim, S. S.

    2000-01-01

    First of all, this study evaluated the impacts on the health and the environment of air pollutants emitted from coal power plant and nuclear power pant, two major electric power generating options in Korea. Then, the environmental external costs of those two options were estimated by transforming the health and environment impact into monetary values. To do this, AIRPACTS and Impacts of Atmospheric Release model developed by IAEA were used. The environmental external cost of Samcheonpo coal power plant was estimated about 25 times as much as that of Younggwang nuclear power plant. This result implies that nuclear power plant is a clean technology compared with coal power plant. This study suggests that the external cost should be reflected in the electric system expansion plan in order to allocate energy resources efficiently and to reduce economic impact stemming from the environmental regulation emerged recently on a global level

  16. Biological removal of sulfur from coal flotation concentrate by culture isolated from coal washery plant tailing dump

    Energy Technology Data Exchange (ETDEWEB)

    Jorjani, E. [Azad University, Tehran (Iran). Mining Engineering Dept.

    2005-10-15

    A combination of flotation and microbial leaching processes was used to achieve acceptable level of sulfur and ash in Tabas coal sample of Iran. Representative sample of the minus 500 micron size fraction was subjected to flotation separation for the removal of ash and sulfur. The final concentrate with recovery, combustion value and sulfur content of 86.03, 86.45 and 1.35% respectively was achieved at pH 8 and following reagent dosage and operating conditions: collector: diesel oil (1200 g/ton), frother: MIBC (5%) + pine oil (95%) with concentration of 120 (g/ton), depressant: sodium silicate (1000 g/ton), particle size: {lt} 500 {mu} m and pulp density: 7%. Because of fine distribution of sulfur on Tabas coal macerals and lithotypes, high percentage of total sulfur (79.9%) is distributed in flotation concentrate and only 20.1% is yielded in the tails. So microbial leaching using a species isolated from coal washery plant tailing dump was used in batch system to remove sulfur from flotation concentrate. The conditions were optimized for the maximum removal of sulfur. These conditions were found to be pH of 2, particle size less than 0.18 mm; pulp density: 8%, temperature: 30 {sup o}C, shaking rate: 150 rpm conditions. Total sulfur and ash content was reduced by bioleaching from 13.55 and 1.35 in flotation concentrate to 9.47 and 0.55 in the final leached concentrate, a reduction of 35 and 61.9% respectively. Sterilization of coal adversely affects the sulfur reduction. The results suggest that the isolated culture is sufficiently effective for depyritization of Tabas coal flotation concentrate in stirred system.

  17. Radiological impact of airborne effluents of coal-fired and nuclear power plants

    International Nuclear Information System (INIS)

    McBride, J.P.; Moore, R.E.; Witherspoon, J.P.; Blanco, R.E.

    1977-06-01

    Radiological impact of naturally occurring radionuclides in airborne effluents of a model coal-fired steam plant is evaluated assuming a release to the atmosphere of 1 percent of the ash in the coal burned and compared with the impact of radioactive materials in the airborne effluents of model light-water reactors. The principal exposure pathway for radioactive materials released from both types of plants is ingestion of contaminated foodstuffs. For nuclear plants immersion in the airborne effluents is also a significant factor in the dose commitment. Assuming that the coal burned contains 1 ppM uranium and 2 ppM thorium together with their decay products and using the same impact analysis methods used in evaluating nuclear facilities, the maximum individual dose commitments from the coal plant for the whole body and most organs (except the thyroid) are shown to be greater than those from a pressurized-water reactor (PWR) and, with the exception of the bone and kidney doses, less than those from a boiling-water reactor (BWR). With the exception of the bone dose, the maximum individual dose commitments from the coal plant are less than the numerical design guideline limits listed for light-water reactors (LWRs). Population dose commitments from the coal plant are higher than those from either nuclear plant

  18. Coal-fired power plants and the causes of high temperature corrosion

    Energy Technology Data Exchange (ETDEWEB)

    Oakey, J E; Simms, N J [British Coal Corporation, Coal Technology Development Div., Cheltenham, Glos (United Kingdom); Tomkings, A B [ERA Technology Ltd., Leatherhead, Surrey (United Kingdom)

    1996-12-01

    The heat exchangers in all types of coal-fired power plant operate in aggressive, high temperature environments where high temperature corrosion can severely limit their service lives. The extent of this corrosion is governed by the combined effects of the operating conditions of the heat exchanger and the presence of corrosive species released from the coal during operation. This paper reviews the coal-related factors, such as ash deposition, which influence the operating environments of heat exchangers in three types of coal-fired power plant - conventional pulverized coal boilers, fluidized bed boilers and coal gasification systems. The effects on the performance of the materials used for these heat exchangers are then compared. (au) 35 refs.

  19. CoalFleet for tomorrow. An industry initiative to accelerate the deployment of advanced coal-based generation plants

    Energy Technology Data Exchange (ETDEWEB)

    Parkes, J.; Holt, N.; Phillips, J. [Electric Power Research Institute (United States)

    2006-07-01

    The industry initiative 'CoalFleet for tomorrow' was launched in November 2004 to accelerate the deployment and commercialization of clean, efficient, advanced coal power systems. This paper discusses the structure of CoalFleet and its strategy for reducing the cost, leadtime and risk of deploying advanced coal technologies such as combined-cycle power plants. 6 figs.

  20. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Planting Transferability Pilot Project. 1412.48... and Peanuts 2008 through 2012 § 1412.48 Planting Transferability Pilot Project. (a) Notwithstanding § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot Project...

  1. FY 1994 report on the Coal Gasification Committee; 1994 nendo sekitan gasuka iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The paper reported activities of the Coal Gasification Committee in FY 1994. The 1st Coal Gasification Committee Meeting was held on May 18,1994, the 2nd Meeting on October 28, 1994, and the 3rd Meeting on February 21, 1995. Report/discussion were made about activities of each section meeting and the progress of the development of coal gasification technology. For the 50 t/d HYCOL pilot plant, disassembly examination was conducted. As a result of the examination, the high-temperature gas corrosion caused by gas product against metal members was negligible, but against members in the wet corrosion environment, SCC, intergranular corrosion and pitting corrosion were generated. About members used in the high-temperature environment, it was made clear that Ir was applicable to thermowell, high chromia-base sintered products were applicable to non-cooling hearth tapping materials, and high chromia-base indeterminate-formed materials were applicable to water-cooled fireproofing wall. Based on the data obtained through the operational study of a 50 t/d pilot plant, conceptual design was made of a coal gasification hydrogen production plant of a scale of demonstration plant. (NEDO)

  2. Basic data report for drillholes at the H-11 complex (Waste Isolation Pilot Plant-WIPP)

    International Nuclear Information System (INIS)

    Mercer, J.W.; Snyder, R.P.

    1990-05-01

    Drillholes H-11b1, H-11b2, and H-11b3 were drilled from August to December 1983 for site characterization and hydrologic studies of the Culebra Dolomite Member of the Upper Permian Rustler Formation at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. In October 1984, the three wells were subjected to a series of pumping tests designed to develop the wells, provide information on hydraulic communication between the wells, provide hydraulic properties information, and to obtain water samples for quality of water measurements. Based on these tests, it was determined that this location would provide an excellent pad to conduct a convergent-flow non-sorbing tracer test in the Culebra dolomite. In 1988, a fourth hole (H-11b4) was drilled at this complex to provide a tracer-injection hole for the H-11 convergent-flow tracer test and to provide an additional point at which the hydraulic response of the Culebra H-11 multipad pumping test could be monitored. A suite of geophysical logs was run on the drillholes and was used to identify different lithologies and aided in interpretation of the hydraulic tests. 4 refs., 6 figs., 6 tabs

  3. Basic data report for drillholes at the H-11 complex (Waste Isolation Pilot Plant-WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    Mercer, J.W. (Sandia National Labs., Albuquerque, NM (USA)); Snyder, R.P. (Geological Survey, Denver, CO (USA))

    1990-05-01

    Drillholes H-11b1, H-11b2, and H-11b3 were drilled from August to December 1983 for site characterization and hydrologic studies of the Culebra Dolomite Member of the Upper Permian Rustler Formation at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. In October 1984, the three wells were subjected to a series of pumping tests designed to develop the wells, provide information on hydraulic communication between the wells, provide hydraulic properties information, and to obtain water samples for quality of water measurements. Based on these tests, it was determined that this location would provide an excellent pad to conduct a convergent-flow non-sorbing tracer test in the Culebra dolomite. In 1988, a fourth hole (H-11b4) was drilled at this complex to provide a tracer-injection hole for the H-11 convergent-flow tracer test and to provide an additional point at which the hydraulic response of the Culebra H-11 multipad pumping test could be monitored. A suite of geophysical logs was run on the drillholes and was used to identify different lithologies and aided in interpretation of the hydraulic tests. 4 refs., 6 figs., 6 tabs.

  4. Automatic coal sampling for thermoelectric power plants. Some remarks on moisture

    Energy Technology Data Exchange (ETDEWEB)

    Tanzi, M.

    1983-06-01

    The following topics are discussed: coal sampling and reference standards; coal moisture and sampling; main technical data of the coal sampling station built for the EWEL power plant in Brindisi, Italy.

  5. Exergetic and Parametric Study of a Solar Aided Coal-Fired Power Plant

    Directory of Open Access Journals (Sweden)

    Eric Hu

    2013-03-01

    Full Text Available A solar-aided coal-fired power plant realizes the integration of a fossil fuel (coal or gas and clean energy (solar. In this paper, a conventional 600 MW coal-fired power plant and a 600 MW solar-aided coal-fired power plant have been taken as the study case to understand the merits of solar-aided power generation (SAPG technology. The plants in the case study have been analyzed by using the First and Second Laws of Thermodynamics principles. The solar irradiation and load ratio have been considered in the analysis. We conclude that if the solar irradiation was 925 W/m2 and load ratio of the SAPG plant was 100%, the exergy efficiency would be 44.54% and the energy efficiency of the plant (46.35%. It was found that in the SAPG plant the largest exergy loss was from the boiler, which accounted for about 76.74% of the total loss. When the load ratio of the unit remains at 100%, and the solar irradiation varies from 500 W/m2 to 1,100 W/m2, the coal savings would be in the range of 8.6 g/kWh to 15.8 g/kWh. If the solar irradiation were kept at 925 W/m2 while the load ratio of the plant changed from 30% to 100%, the coal savings could be in the range of 11.99 g/kWh to 13.75 g/kWh.

  6. Fuel prices, emission standards, and generation costs for coal vs natural gas power plants.

    Science.gov (United States)

    Pratson, Lincoln F; Haerer, Drew; Patiño-Echeverri, Dalia

    2013-05-07

    Low natural gas prices and stricter, federal emission regulations are promoting a shift away from coal power plants and toward natural gas plants as the lowest-cost means of generating electricity in the United States. By estimating the cost of electricity generation (COE) for 304 coal and 358 natural gas plants, we show that the economic viability of 9% of current coal capacity is challenged by low natural gas prices, while another 56% would be challenged by the stricter emission regulations. Under the current regulations, coal plants would again become the dominant least-cost generation option should the ratio of average natural gas to coal prices (NG2CP) rise to 1.8 (it was 1.42 in February 2012). If the more stringent emission standards are enforced, however, natural gas plants would remain cost competitive with a majority of coal plants for NG2CPs up to 4.3.

  7. Analysis of radionuclides in airborne effluents from coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Rosner, G.; Chatterjee, B.; Hoetzl, H.; Winkler, R.

    1982-01-01

    In order to assess the level of radioactivity emitted by coal-fired power plants in detail, specific activities of several radionuclides have been measured in samples from a coal-fired and a brown coal-fired plant in the Federal Republic of Germany. Samples measured included coal, brown coal, bottom ash, collected fly ash from the various electrostatic precipitator stages and sieve fractions of collected fly ash as well as samples of escaping fly ash taken from the exhaust stream, all taken simultaneously on three operating days. Nuclides measured were U-238, U-234, Th-232, Th-230, Th-228, Ra-226, Pb-210, Po-210 and K-40. Methods applied included (i) direct gamma spectrometry, (ii) radiochemical separation with subsequent alpha spectrometry and (iii) direct alpha spectrometry. Methods are described and discussed. Finally, annual emission rates of airborne radionuclides are calculated for both plants.

  8. Analysis of radionuclides in airborne effluents from coal-fired power plants

    International Nuclear Information System (INIS)

    Rosner, G.; Chatterjee, B.; Hoetzl, H.; Winkler, R.

    1982-01-01

    In order to assess the level of radioactivity emitted by coal-fired power plants in detail, specific activities of several radionuclides have been measured in samples from a coal-fired and a brown coal-fired plant in the Federal Republic of Germany. Samples measured included coal, brown coal, bottom ash, collected fly ash from the various electrostatic precipitator stages and sieve fractions of collected fly ash as well as samples of escaping fly ash taken from the exhaust stream, all taken simultaneously on three operating days. Nuclides measured were U-238, U-234, Th-232, Th-230, Th-228, Ra-226, Pb-210, Po-210 and K-40. Methods applied included (i) direct gamma spectrometry, (ii) radiochemical separation with subsequent alpha spectrometry and (iii) direct alpha spectrometry. Methods are described and discussed. Finally, annual emission rates of airborne radionuclides are calculated for both plants. (orig.)

  9. Report for fiscal 1993 by coal gasification committee; 1993 nendo sekitan gas ka iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1984-03-01

    This report is a compilation mainly of distributed material. In the development of entrained bed coal gasification power generation, gasification is tested in a 2t/d-capable facility and gasification efficiency and operation characteristics are grasped, these constituting the studies of elements to assist pilot plant operation etc. The fluid temperature point of slag is found to decrease by 200 degrees C at the maximum upon addition of flux (CaO), and this improves on slag fluidity. For the development of a demonstration gas turbine, an experimentally built combustor is tested using a real gas. A combined cycle power system is studied by simulation. In the study of pilot plant operation, measures relative to slagging are implemented, inspection and maintenance are conducted for each facility, and the combustor for a demonstration plant is subjected to oil and coal combustion tests. In the study of a pilot plant for developing technologies for hydrogen production using coal, the plant stably runs more than 1,000 hours under 100% load at in a RUN-8-3 operation. Some deposit collects in the neighborhood of the contracted area of the blow nozzle and on some part in the slip stream, but it does not affect operation. No abnormalities are detected in the cyclone or heat recovery boiler. The pilot plant is let to continue its operation, and excellent results are achieved, which are beyond the targets of carbon conversion efficiency of 98% or higher and gas cooling efficiency of 78% or higher. (NEDO)

  10. Process Experimental Pilot Plant

    International Nuclear Information System (INIS)

    Henze, H.

    1986-01-01

    The Process Experimental Pilot Plant (PREPP) at the Idaho National Engineering Laboratory (INEL) was built to convert transuranic contaminated solid waste into a form acceptable for disposal at the Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico. There are about 2.0 million cubic ft of transuranic waste stored at the Transuranic Storage Area of the INEL's Radioactive Waste Management Complex (RWMC). The Stored Waste Examination Pilot Plant (SWEPP) located at the RWMC will examine this stored transuranic waste to determine if the waste is acceptable for direct shipment to and storage at WIPP, or if it requires shipment to PREPP for processing before shipment to WIPP. The PREPP process shreds the waste, incinerates the shredded waste, and cements (grouts) the shredded incinerated waste in new 55-gal drums. Unshreddable items are repackaged and returned to SWEPP. The process off-gas is cleaned prior to its discharge to the atmosphere, and complies with the effluent standards of the State of Idaho, EPA, and DOE. Waste liquid generated is used in the grouting operation

  11. Petrography and microanalysis of Pennsylvanian coal-ball concretions (Herrin Coal, Illinois Basin, USA): Bearing on fossil plant preservation and coal-ball origins

    Science.gov (United States)

    Siewers, Fredrick D.; Phillips, Tom L.

    2015-11-01

    Petrographic analyses of 25 coal balls from well-studied paleobotanical profiles in the Middle Pennsylvanian Herrin Coal (Westphalian D, Illinois Basin) and five select coal balls from university collections, indicate that Herrin Coal-ball peats were permineralized by fibrous and non-fibrous carbonates. Fibrous carbonates occur in fan-like to spherulitic arrays in many intracellular (within tissue) pores, and are best developed in relatively open extracellular (between plant) pore spaces. Acid etched fibrous carbonates appear white under reflected light and possess a microcrystalline texture attributable to abundant microdolomite. Scanning electron microscopy, X-ray diffraction, and electron microprobe analysis demonstrate that individual fibers have a distinct trigonal prism morphology and are notable for their magnesium content (≈ 9-15 mol% MgCO3). Non-fibrous carbonates fill intercrystalline spaces among fibers and pores within the peat as primary precipitates and neomorphic replacements. In the immediate vicinity of plant cell walls, non-fibrous carbonates cut across fibrous carbonates as a secondary, neomorphic phase attributed to coalification of plant cell walls. Dolomite occurs as diagenetic microdolomite associated with the fibrous carbonate phase, as sparite replacements, and as void-filling cement. Maximum dolomite (50-59 wt.%) is in the top-of-seam coal-ball zone at the Sahara Mine, which is overlain by the marine Anna Shale. Coal-ball formation in the Herrin Coal began with the precipitation of fibrous high magnesium calcite. The trigonal prism morphology of the carbonate fibers suggests rapid precipitation from super-saturated, meteoric pore waters. Carbonate precipitation from marine waters is discounted on the basis of stratigraphic, paleobotanical, and stable isotopic evidence. Most non-fibrous carbonate is attributable to later diagenetic events, including void-fill replacements, recrystallization, and post-depositional fracture fills. Evidence

  12. Radioactive commitment due to use of coal in power plants

    International Nuclear Information System (INIS)

    Fenger, J. and H. Flyger.

    1980-11-01

    A short review of the literature on release of radioactivity due to use of coal in power plants with the emphasis on the stack effluent and waste products. It is concluded that during normal operation coal fired power plants give a larger dose commitment than nuclear power plants, but both types have insignificant effects. The problem of waste management has never been studied in detail; ash deposit should probably be monitored. (Auth)

  13. Subsequent flue gas desulfurization of coal-fired power plant units

    International Nuclear Information System (INIS)

    Willibal, U.; Braun, Gy.

    1998-01-01

    The presently operating coal-fired power plant in Hungary do not satisfy the pollution criteria prescribed by the European Union norms. The main polluting agent is the sulfur dioxide emitted by some of the power plants in Hungary in quantities over the limit standards. The power plant units that are in good operating state could be made competitive by using subsequent desulfurization measures. Various flue gas desulfurization technologies are presented through examples that can be applied to existing coal-fired power plants. (R.P.)

  14. Natural Radionuclides in Slag/Ash Pile from Coal-Fired Power Plant Plomin

    International Nuclear Information System (INIS)

    Barisic, D.; Lulic, S.; Marovic, G.; Sencar, J.

    2001-01-01

    Full text: The coal slag/ash pile contains about one million tons of different (bottom ash, filter ash, gypsum) waste material deposited in vicinity of Plomin coal-fired power plant. Activities of 40 K, 228 Ra, 226 Ra and 238 U in materials deposited on slag/ash pile as well as in used coals were occasionally measured during past more than two and half decades of Plomin coal-fired plant operation. The radionuclides content in deposited bottom and filter ash material are related with radionuclide activities and mineral matter fraction in coals used. Up to the middle of nineties, the majority of coal used was anthracite from Istrian local mines. In that period, deposited waste material was characterised with relatively high 226 Ra and 238 U activities while potassium and thorium content was very low. When Istrian coal has been completely substituted with imported coal, uranium series radionuclide concentrations in deposited waste materials decreased significantly. Meanwhile, potassium and thorium activities in slag/ash pile material increased. It seems that slag/ash pile material generated in the last several years of Plomin coal-fired power plant operation could be generally used in cement industry without any special restriction. (author)

  15. Plan for the civil reprocessing pilot plant of China

    International Nuclear Information System (INIS)

    Wang, D.Y.; Chen, M.

    1987-01-01

    Based on the R and D work, experience on plant operation and site situation, the necessity and feasibility of building a pilot plant for civil reprocessing in China are discussed. The capacity of 100 kg HM/day (LWR) and 3 kg HM/day (MTR) has been proposed. The plant consists of cold testing facility and hot pilot facility. It is expected to complete the pilot plant in 1990's. This paper also describes the purpose, scale, process and equipment of the pilot plant

  16. Fiscal 1991 report on the brown coal liquefaction section meeting; 1991 nendo kattan ekika bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    At the 1st through 5th brown coal liquefaction group meetings held for the fiscal year, reports are delivered and discussions are made about the progress of research and development. At the 1st meeting, a fiscal 1991 brown coal liquefaction research plan is introduced, and discussed. At the 2nd meeting, an interim report on the brown coal liquefaction technology development project is discussed. At the 3rd meeting (a joint meeting of the brown coal and bituminous coal liquefaction groups), an agendum entitled 'what the development of brown/bituminous coal liquefaction technologies for the 21st century should be' is reported, and discussed. At the 4th meeting, reports are made on the results of deliberation at the Industrial Technology Council, progress of the follow-up study, progress of the collection of achievements, and so forth. At the 5th meeting, the outline of the follow-up study, the collection of achievements in the pilot plant study (a project report preparation schedule and materials evaluation), the progress of pilot plant dismantling work, etc., are reported and discussed. (NEDO)

  17. Fiscal 1991 report on the brown coal liquefaction section meeting; 1991 nendo kattan ekika bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    At the 1st through 5th brown coal liquefaction group meetings held for the fiscal year, reports are delivered and discussions are made about the progress of research and development. At the 1st meeting, a fiscal 1991 brown coal liquefaction research plan is introduced, and discussed. At the 2nd meeting, an interim report on the brown coal liquefaction technology development project is discussed. At the 3rd meeting (a joint meeting of the brown coal and bituminous coal liquefaction groups), an agendum entitled 'what the development of brown/bituminous coal liquefaction technologies for the 21st century should be' is reported, and discussed. At the 4th meeting, reports are made on the results of deliberation at the Industrial Technology Council, progress of the follow-up study, progress of the collection of achievements, and so forth. At the 5th meeting, the outline of the follow-up study, the collection of achievements in the pilot plant study (a project report preparation schedule and materials evaluation), the progress of pilot plant dismantling work, etc., are reported and discussed. (NEDO)

  18. Energy economics of nuclear and coal fired power plant

    International Nuclear Information System (INIS)

    Lee, Kee Won; Cho, Joo Hyun; Kim, Sung Rae; Choi, Hae Yoon

    1995-01-01

    The upturn of Korean nuclear power program can be considered to have started in early 70's while future plants for the construction of new nuclear power plants virtually came to a halt in United States. It is projected that power plant systems from combination of nuclear and coal fired types might shift to all coal fired type, considering the current trend of construction on the new plants in the United States. However, with the depletion of natural resources, it is desirable to understand the utilization of two competitive utility technologies in terms of of invested energy. Presented in this paper is a comparison between two systems, nuclear power plant and coal fired steam power plant in terms of energy investment. The method of comparison is Net Energy Analysis (NEA). In doing so, Input-Output Analysis (IOA) among industries and commodities is done. Using these information, net energy ratios are calculated and compared. NEA is conducted for power plants in U.S. because the availability of necessary data are limited in Korea. Although NEA does not offer conclusive solution, this method can work as a screening process in decision making. When considering energy systems, results from such analysis can be used as a general guideline. 2 figs., 12 tabs., 5 refs. (Author)

  19. Electrocoagulation project: Pilot study testwork

    Energy Technology Data Exchange (ETDEWEB)

    Donini, J.C.; Garand, D.K.; Hassan, T.A.; Kar, K.L.; Thind, S.S.

    1991-09-01

    When a suspension or emulsion flows between two sacrificial metal electrodes excited by ac, the dispersed phase is consolidated and then settles. Laboratory-scale investigation of this mechanism, called electrocoagulation, and of its areas of application to water treatment were previously completed and a subsequent project was initiated to design and construct pilot-scale equipment consisting of an electrocoagulation cell, power supply, and computerized control system. The constructed pilot plant was used to test the effectiveness of electrocoagulation to clarify coal processing plant effluent. Results obtained with clay suspensions showed that flow conditions in the cell have a major effect on electric power consumption, and a reduction by a factor of three on this crucial cost parameter appeared possible compared to a previously tested batch-scale electrocoagulation system. Results obtained using the coal plant thickener feed closely duplicated those obtained with the clay mixtures. Aluminum electrode consumption, however, remained unchanged compared to the bench-scale tests. Supernatant clarity far exceeded requirements, while settling rate was too low. The settling could be speeded up by appropriate use of chemicals, but such addition affects the coagulation mechanism and reduces supernatant clarity. A tradeoff between settling rate and clarity was thus established. The total cost of treatment was deemed to be in excess of coal company requirements, but the pilot tests revealed much about the electrocoagulation system under continuous flow conditions. The technology is seen as having application in other areas such as municipal and industrial waste treatment. 22 refs., 6 figs., 2 tabs.

  20. Environmental impact assessment of coal power plants in operation

    Directory of Open Access Journals (Sweden)

    Bartan Ayfer

    2017-01-01

    Full Text Available Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly ash, bottom ash, the cooling water intake impact on aquatic biota, and the thermal pollution. In the proposed tool, the boundaries of the fuzzy logic membership functions were established taking into account the threshold values of the environmental parameters which were defined in the environmental legislation. Scoring of these environmental parameters were done with the statistical analysis of the environmental monitoring data of the power plant and by using the documented evidences that were obtained during the site visits. The proposed method estimates each environmental impact factor level separately and then aggregates them by calculating the Environmental Impact Score (EIS. The proposed method uses environmental monitoring data and documented evidence instead of using simulation models. The proposed method has been applied to the 4 coal-fired power plants that have been operation in Turkey. The Environmental Impact Score was obtained for each power plant and their environmental performances were compared. It is expected that those environmental impact assessments will contribute to the decision-making process for environmental investments to those plants. The main advantage of the proposed method is its flexibility and ease of use.

  1. Environmental impact assessment of coal power plants in operation

    Science.gov (United States)

    Bartan, Ayfer; Kucukali, Serhat; Ar, Irfan

    2017-11-01

    Coal power plants constitute an important component of the energy mix in many countries. However, coal power plants can cause several environmental risks such as: climate change and biodiversity loss. In this study, a tool has been proposed to calculate the environmental impact of a coal-fired thermal power plant in operation by using multi-criteria scoring and fuzzy logic method. We take into account the following environmental parameters in our tool: CO, SO2, NOx, particulate matter, fly ash, bottom ash, the cooling water intake impact on aquatic biota, and the thermal pollution. In the proposed tool, the boundaries of the fuzzy logic membership functions were established taking into account the threshold values of the environmental parameters which were defined in the environmental legislation. Scoring of these environmental parameters were done with the statistical analysis of the environmental monitoring data of the power plant and by using the documented evidences that were obtained during the site visits. The proposed method estimates each environmental impact factor level separately and then aggregates them by calculating the Environmental Impact Score (EIS). The proposed method uses environmental monitoring data and documented evidence instead of using simulation models. The proposed method has been applied to the 4 coal-fired power plants that have been operation in Turkey. The Environmental Impact Score was obtained for each power plant and their environmental performances were compared. It is expected that those environmental impact assessments will contribute to the decision-making process for environmental investments to those plants. The main advantage of the proposed method is its flexibility and ease of use.

  2. Report on the gasification technology sub-committee of the coal gasification committee in fiscal 1992; 1992 nendo sekitan gas ka iinkai gas ka gijutsu bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    This paper reports the coal gasification committee and the gasification technology sub-committee in fiscal 1992. The paper summarizes the report mainly on the data distributed at the gasification technology sub-committee meetings in fiscal 1992. In developing the coal utilizing hydrogen manufacturing technology, the trial operation was started on the pilot plant in fiscal 1991, wherein two comprehensive trial operations were carried out on gasification of 10 kg/cm{sup 2} to extract troubles throughout the whole system, smooth temperature rise and pressure rise were performed, and coal and oxygen were supplied into a furnace to have verified ignition of the coal. Furthermore, one trial operation for gasification of 30 kg/cm{sup 2} was executed. Fiscal 1992 will continue the gasification test of 30 kg/cm{sup 2}. In addition, a test on measures to improve efficiency purposed for gasification efficiency enhancement is carried out, and so is a coal type diversification test purposed to expand coal type applicability. A study was performed by using a small device as a pilot plant supporting study. Prototype fabrication, development, and in-plant tests were made on materials for plant devices (refractories and ceramics). The paper also describes the current status of HYCOL pilot plant operation study. Discussions were given also on heat balance of a gasification furnace. (NEDO)

  3. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Part 3. Fabrication/installation of pilot plant (Fabrication/installation drawings and fabrication/installation pictures - 2/2); 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant seisaku suetsuke hen (Seisaku suetsukezu oyobi seisaku suetsuke shashin) (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and fabrication/installation drawings and fabrication/installation pictures were summarized. In fabrication/installation drawings, drawings of the following were included: safety environmental equipment (total system diagram, layout scheme drawing, layout of electric room equipment, layout of control equipment room, etc.), total control system (structural drawing of the total control system, outline drawing of operation control panel, operator console of the integrated load pressure control system, operator console of the integrated sequential control system, central control panel, etc.), 66kV/6.9kV indoor switching station facilities (layout of equipment of indoor switching station facilities, outline drawing of the main transformer, outline drawing of cooler control panel of the main transformer, etc.), common facilities (total layout, diagram of the equipment cooling water pipe system, diagram of the fire-extinguishing water pipe system, etc.) In pictures of fabrication/installation, pictures of the following were included: gasifier equipment, gas refining facilities, gas turbine facilities, actual-pressure/actual-size combustor test equipment, safety environmental equipment, total control system, common facilities, etc. (NEDO)

  4. Techniques to determine ignition, flame stability and burnout of blended coals in p.f. power station boilers

    Energy Technology Data Exchange (ETDEWEB)

    Su, S.; Pohl, J.H.; Holcombe, D.; Hart, J.A. [University of Queensland, Brisbane, Qld. (Australia). Dept. of Chemical Engineering

    2001-07-01

    The blending of coals has become popular to improve the performance of coals, to meet specifications of power plants and to reduce the cost of coals. This article reviews the results and provides new information on ignition, flame stability, and carbon burnout studies of blended coals. The reviewed studies were conducted in laboratory-, pilot-, and full-scale facilities. The new information was taken in pilot-scale studies. The results generally show that blending a high-volatile coal with a low-volatile coal or anthracite can improve the ignition, flame stability and burnout of the blends. This paper discusses two general methods to predict the performance of blended coals: (1) experiment; and (2) indices. Laboratory- and pilot-scale tests, at least, provide a relative ranking of the combustion performance of coal/blends in power station boilers. Several indices, volatile matter content, heating value and a maceral index, can be used to predict the relative ranking of ignitability and flame stability of coals and blends. The maceral index, fuel ratio, and vitrinite reflectance can also be used to predict the absolute carbon burnout of coal and blends within limits. 59 refs., 20 figs., 4 tabs.

  5. Simulation, design and operation of a plant of production of activated coal

    International Nuclear Information System (INIS)

    Aguirre Cardona, Jaime; Ocampo Orozco, Alonso; Espinel Sanchez, Jorge

    1997-01-01

    This paper shows the design steps and result of a project worked by the coal chemistry group of Facultad de Minas (Universidad Nacional) and de international development research Centre (IDRC - Canada). The central idea of the project was to develop a continuous physical activation process of coals, in fluidized bed; the process was developed as a pilot scale and it is possible to obtain granular active carbons for water treatment

  6. Hazardous air pollutants emission from coal and oil-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Deepak Pudasainee; Jeong-Hun Kim; Sang-Hyeob Lee; Ju-Myon Park; Ha-Na Jang; Geum-Ju Song; Yong-Chil Seo [Yonsei University, Wonju (Republic of Korea). Department of Environmental Engineering

    2010-03-15

    Hazardous air pollutants (HAPs) emission characteristics from coal (anthracite, bituminous) and oil-fired power plants were studied in order to control pollutants by formulating US maximum achievable control technology (MACT)-like regulation in Korea. Sampling and analysis were carried out according to either Korean standard test method or US EPA method. Relatively lower levels of NOx and SOx were emitted from plants burning bituminous than the anthracite coal. Less dust was emitted from oil-fired power plants. Mercury, lead, and chromium were dominant in coal-fired power plants, following which, nickel and chromium were emitted from oil-fired power plants. The major volatile organic compounds (VOCs) emitted from coal-fired plants were 1,2-dichloroethane, benzene, carbon tetrachloride, chloroform, trichloro-ethylene. The emission of mercury and other heavy metals in flue gas was attributed to fuel types, operating conditions, residence time in the control devices and the type of air pollution control devices. After emission tests in the field and on analysis of the continuous emission monitoring data collected from facilities under operation and consideration of other various factors, management guidelines will be suggested with special reference to US MACT-like regulation.

  7. Environmental impact of coal industry and thermal power plants in India.

    Science.gov (United States)

    Mishra, U C

    2004-01-01

    Coal is the only natural resource and fossil fuel available in abundance in India. Consequently, it is used widely as a thermal energy source and also as fuel for thermal power plants producing electricity. India has about 90,000 MW installed capacity for electricity generation, of which more than 70% is produced by coal-based thermal power plants. Hydro-electricity contributes about 25%, and the remaining is mostly from nuclear power plants (NPPs). The problems associated with the use of coal are low calorific value and very high ash content. The ash content is as high as 55-60%, with an average value of about 35-40%. Further, most of the coal is located in the eastern parts of the country and requires transportation over long distances, mostly by trains, which run on diesel. About 70% oil is imported and is a big drain on India's hard currency. In the foreseeable future, there is no other option likely to be available, as the nuclear power programme envisages installing 20,000 MWe by the year 2020, when it will still be around 5% of the installed capacity. Hence, attempts are being made to reduce the adverse environmental and ecological impact of coal-fired power plants. The installed electricity generating capacity has to increase very rapidly (at present around 8-10% per annum), as India has one of the lowest per capita electricity consumptions. Therefore, the problems for the future are formidable from ecological, radio-ecological and pollution viewpoints. A similar situation exists in many developing countries of the region, including the People's Republic of China, where coal is used extensively. The paper highlights some of these problems with the data generated in the author's laboratory and gives a brief description of the solutions being attempted. The extent of global warming in this century will be determined by how developing countries like India manage their energy generation plans. Some of the recommendations have been implemented for new plants

  8. Soil to plant transfer factor in the vicinity of coal fired power plants

    International Nuclear Information System (INIS)

    Nikolic, J.; Todorovic, D.; Jankovic, M.; Radenkovic, M.; Joksic, J.

    2009-01-01

    In this paper, the monitoring of working and living environment results in 5 coal fired powered plants, for the period from 2004. to 2009. are presented. Soil-plant transfer factor, suitable for estimation of possible contamination of food chain was chosen, as a measure of influence of power plants on the environment. The results gathered over the years of monitoring of working and living environment in the vicinity of the coal fired power plant were analyzed, and it was determined that no significant discrepancy exists comparing to the results reported in world literature. Also, the basic mathematical analysis was conducted, in order to assess the model of the behavior of the results in respect to the frequency count. (author) [sr

  9. Greenhouse gas emission factor development for coal-fired power plants in Korea

    International Nuclear Information System (INIS)

    Jeon, Eui-Chan; Myeong, Soojeong; Sa, Jae-Whan; Kim, Jinsu; Jeong, Jae-Hak

    2010-01-01

    Accurate estimation of greenhouse gas emissions is essential for developing an appropriate strategy to mitigate global warming. This study examined the characteristics of greenhouse gas emission from power plants, a major greenhouse gas source in Korea. The power plants examined use bituminous coal, anthracite, and sub-bituminous coal as fuel. The CO 2 concentration from power plants was measured using GC-FID with methanizer. The amount of carbon, hydrogen, and calorific values in the input fuel was measured using an elemental analyzer and calorimeter. For fuel analysis, CO 2 emission factors for anthracite, bituminous coal, and sub-bituminous coal were 108.9, 88.4, and 97.9 Mg/kJ, respectively. The emission factors developed in this study were compared with those for IPCC. The results showed that CO 2 emission was 10.8% higher for anthracite, 5.5% lower for bituminous coal, and 1.9% higher for sub-bituminous coal than the IPCC figures.

  10. Birth to death analysis of the energy payback ratio and CO2 gas emission rates from coal, fission, wind, and DT-fusion electrical power plants

    International Nuclear Information System (INIS)

    White, Scott W.; Kulcinski, Gerald L.

    2000-01-01

    The amount of electrical energy produced over the lifetime of coal, LWR fission, UP fusion, and wind power plants is compared to the total amount of energy required to procure the fuel, build, operate, and decommission the power plants. The energy payback ratio varies from a low of 11 for coal plants to a high of 27 for DT-fusion plants. The magnitude of the energy investment and the source of the various energy inputs determine the CO 2 emission factor. This number varies from a low of 9 to a high of 974 tonnes of CO 2 per GW e h for DT-fusion and coal plants, respectively

  11. Ways to Improve Russian Coal-Fired Power Plants

    International Nuclear Information System (INIS)

    Tumanovskii, A. G.; Olkhovsky, G. G.

    2015-01-01

    Coal is an important fuel for the electric power industry of Russia, especially in Ural and the eastern part of the country. It is fired in boilers of large (200 – 800 MW) condensing power units and in many cogeneration power plants with units rated at 50 – 180 MW. Many coal-fired power plants have been operated for more than 40 – 50 years. Though serviceable, their equipment is obsolete and does not comply with the current efficiency, environmental, staffing, and availability standards. It is urgent to retrofit and upgrade such power plants using advanced equipment, engineering and business ideas. Russian power-plant engineering companies have designed such advanced power units and their equipment such as boilers, turbines, auxiliaries, process and environmental control systems similar to those produced by the world’s leading manufacturers. Their performance and ways of implementation are discussed

  12. Ways to Improve Russian Coal-Fired Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Tumanovskii, A. G., E-mail: vti@vti.ru; Olkhovsky, G. G. [JSC “All-Russia Thermal Engineering Institute,” (Russian Federation)

    2015-07-15

    Coal is an important fuel for the electric power industry of Russia, especially in Ural and the eastern part of the country. It is fired in boilers of large (200 – 800 MW) condensing power units and in many cogeneration power plants with units rated at 50 – 180 MW. Many coal-fired power plants have been operated for more than 40 – 50 years. Though serviceable, their equipment is obsolete and does not comply with the current efficiency, environmental, staffing, and availability standards. It is urgent to retrofit and upgrade such power plants using advanced equipment, engineering and business ideas. Russian power-plant engineering companies have designed such advanced power units and their equipment such as boilers, turbines, auxiliaries, process and environmental control systems similar to those produced by the world’s leading manufacturers. Their performance and ways of implementation are discussed.

  13. Investigation of Parameters Affecting Gypsum Dewatering Properties in a Wet Flue Gas Desulphurization Pilot Plant

    DEFF Research Database (Denmark)

    Hansen, Brian Brun; Kiil, Søren

    2012-01-01

    of impurities (0.002 M Al2F6; 50 g quartz/L; 0.02 M Al3+, and 0.040 M Mg2+) were investigated. In addition, slurry from a full-scale wet FGD plant, experiencing formation of flat shaped crystals and poor gypsum dewatering properties, was transferred to the pilot plant to test if the plant would now start...... to time. In this work, the particle size distribution, morphology, and filtration rate of wet FGD gypsum formed in a pilot-scale experimental setup, operated in forced oxidation mode, have been studied. The influence of holding tank residence time (10–408 h), solids content (30–169 g/L), and the presence...... to produce low quality gypsum. The crystals formed in the pilot plant, on the basis of the full-scale slurry did, however, show acceptable filtration rates and crystal morphologies closer to the prismatic crystals from after pilot plant experiments with demineralized water. The gypsum slurry filtration rates...

  14. Who's doing coal plant maintenance?

    Energy Technology Data Exchange (ETDEWEB)

    Oldani, R.

    2008-02-15

    POWER has reported on several EUCG bench marking studies over the past several years. This paper examines the maintenance staffing of 45 coal plants reported by 13 EUCG member utilities. If you benchmark your plants or fleet, as you should, some of the study's results challenge what is considered conventional wisdom.

  15. Control strategies of atmospheric mercury emissions from coal-fired power plants in China.

    Science.gov (United States)

    Tian, Hezhong; Wang, Yan; Cheng, Ke; Qu, Yiping; Hao, Jiming; Xue, Zhigang; Chai, Fahe

    2012-05-01

    Atmospheric mercury (Hg) emission from coal is one of the primary sources of anthropogenic discharge and pollution. China is one of the few countries in the world whose coal consumption constitutes about 70% of total primary energy, and over half of coals are burned directly for electricity generation. Atmospheric emissions of Hg and its speciation from coal-fired power plants are of great concern owing to their negative impacts on regional human health and ecosystem risks, as well as long-distance transport. In this paper, recent trends of atmospheric Hg emissions and its species split from coal-fired power plants in China during the period of 2000-2007 are evaluated, by integrating each plant's coal consumption and emission factors, which are classified by different subcategories of boilers, particulate matter (PM) and sulfur dioxide (SO2) control devices. Our results show that the total Hg emissions from coal-fired power plants have begun to decrease from the peak value of 139.19 t in 2005 to 134.55 t in 2007, though coal consumption growing steadily from 1213.8 to 1532.4 Mt, which can be mainly attributed to the co-benefit Hg reduction by electrostatic precipitators/fabric filters (ESPs/FFs) and wet flue gas desulfurization (WFGD), especially the sharp growth in installation of WFGD both in the new and existing power plants since 2005. In the coming 12th five-year-plan, more and more plants will be mandated to install De-NO(x) (nitrogen oxides) systems (mainly selective catalytic reduction [SCR] and selective noncatalytic reduction [SNCR]) for minimizing NO(x) emission, thus the specific Hg emission rate per ton of coal will decline further owing to the much higher co-benefit removal efficiency by the combination of SCR + ESPs/FFs + WFGD systems. Consequently, SCR + ESPs/FFs + WFGD configuration will be the main path to abate Hg discharge from coal-fired power plants in China in the near future. However advanced specific Hg removal technologies are necessary

  16. Leaching characteristics of trace elements in desulfurization gypsum from a coal-fired power plant

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Y.K.; Zhuo, Y.Q.; Zhu, Z.W.; Chen, C.H. [Tsinghua Univ., Beijing (China). Inst. of Thermal Engineering

    2013-07-01

    The contents and leaching characteristics of Cr, Cd, As, Pb and Se in FGD gypsum from a 200 MW coal-fired power plant were investigated in this study. Experimental results revealed that: the leaching characteristics of As and Se were similar, both leaching rates were not obviously affected by pH but increased with increase of the liquid-solid ratio. Pb and Cr had similar leaching characteristics, their leaching rates were closely related with the pH of leaching solution and increased with the lowering of pH and both increased with the increasing of solid-liquid ratio. Along with the increase of the liquid-solid ratio, the leaching gradually achieved balance, and the balanced liquid-solid ratio was bigger when pH of leaching solution was lower. Cd content of leaching solution was below detect limit, and thus failed to get its leaching characteristics. The order of trace element content in leaching solution is Pb < Cr < As < Se, and the order of leaching rates is Cr < As < Pb < Se. BCR extraction procedure revealed that trace elements in FGD gypsum were mainly existed as available fraction and migration ability was stronger than that of trace elements in fly ash from coal-fired power plants.

  17. REAL TIME PULVERISED COAL FLOW SOFT SENSOR FOR THERMAL POWER PLANTS USING EVOLUTIONARY COMPUTATION TECHNIQUES

    Directory of Open Access Journals (Sweden)

    B. Raja Singh

    2015-01-01

    Full Text Available Pulverised coal preparation system (Coal mills is the heart of coal-fired power plants. The complex nature of a milling process, together with the complex interactions between coal quality and mill conditions, would lead to immense difficulties for obtaining an effective mathematical model of the milling process. In this paper, vertical spindle coal mills (bowl mill that are widely used in coal-fired power plants, is considered for the model development and its pulverised fuel flow rate is computed using the model. For the steady state coal mill model development, plant measurements such as air-flow rate, differential pressure across mill etc., are considered as inputs/outputs. The mathematical model is derived from analysis of energy, heat and mass balances. An Evolutionary computation technique is adopted to identify the unknown model parameters using on-line plant data. Validation results indicate that this model is accurate enough to represent the whole process of steady state coal mill dynamics. This coal mill model is being implemented on-line in a 210 MW thermal power plant and the results obtained are compared with plant data. The model is found accurate and robust that will work better in power plants for system monitoring. Therefore, the model can be used for online monitoring, fault detection, and control to improve the efficiency of combustion.

  18. Water vulnerabilities for existing coal-fired power plants.

    Energy Technology Data Exchange (ETDEWEB)

    Elcock, D.; Kuiper, J.; Environmental Science Division

    2010-08-19

    This report was funded by the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) Existing Plants Research Program, which has an energy-water research effort that focuses on water use at power plants. This study complements the Existing Plants Research Program's overall research effort by evaluating water issues that could impact power plants. Water consumption by all users in the United States over the 2005-2030 time period is projected to increase by about 7% (from about 108 billion gallons per day [bgd] to about 115 bgd) (Elcock 2010). By contrast, water consumption by coal-fired power plants over this period is projected to increase by about 21% (from about 2.4 to about 2.9 bgd) (NETL 2009b). The high projected demand for water by power plants, which is expected to increase even further as carbon-capture equipment is installed, combined with decreasing freshwater supplies in many areas, suggests that certain coal-fired plants may be particularly vulnerable to potential water demand-supply conflicts. If not addressed, these conflicts could limit power generation and lead to power disruptions or increased consumer costs. The identification of existing coal-fired plants that are vulnerable to water demand and supply concerns, along with an analysis of information about their cooling systems and related characteristics, provides information to help focus future research and development (R&D) efforts to help ensure that coal-fired generation demands are met in a cost-effective manner that supports sustainable water use. This study identified coal-fired power plants that are considered vulnerable to water demand and supply issues by using a geographical information system (GIS) that facilitated the analysis of plant-specific data for more than 500 plants in the NETL's Coal Power Plant Database (CPPDB) (NETL 2007a) simultaneously with 18 indicators of water demand and supply. Two types of demand indicators were

  19. Japan`s New Sunshine Project. 1996 Annual Summary of Coal Liquefaction and Gasification; 1996 nendo new sunshine keikaku seika hokokusho gaiyoshu. Sekitan no ekika gasuka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    In reference to the results of the research and development under the fiscal 1996 New Sunshine Project, a report was summed up on coal liquefaction and coal gasification. As to the R and D of coal liquefaction technology, researches were conducted on liquefaction characteristics and engineering properties by coal kind, catalysts for coal liquefaction, liquefaction reaction of coal and reformation utilization of the liquefied products, liquefaction reaction mechanism and coking mechanism, solubility of coal in solvent and catalytic reaction mechanism, solvent reaction mechanism by hydrogen donor solvent, etc. Concerning the R and D of coal gasification technology, made were the basic study of eco-technology adaptable gasification technology and the study of coal gasification enhancing technology. Further, as to the development of bituminous coal liquefaction technology, carried out were the study in pilot plants and the support study of pilot plants. Additionally, R and D were done of the basic technology of coal liquefaction such as upgrading technology and environmentally acceptable coal liquefaction technology, and of coal hydrogasification technology. 3 refs., 81 figs., 25 tabs.

  20. Future CO2 emissions and electricity generation from proposed coal-fired power plants in India

    Science.gov (United States)

    Fofrich, R.; Shearer, C.; Davis, S. J.

    2017-12-01

    India represents a critical unknown in global projections of future CO2 emissions due to its growing population, industrializing economy, and large coal reserves. In this study, we assess existing and proposed construction of coal-fired power plants in India and evaluate their implications for future energy production and emissions in the country. In 2016, India had 369 coal-fired power plants under development totaling 243 gigawatts (GW) of generating capacity. These coal-fired power plants would increase India's coal-fired generating capacity by 123% and would exceed India's projected electricity demand. Therefore, India's current proposals for new coal-fired power plants would be forced to retire early or operate at very low capacity factors and/or would prevent India from meeting its goal of producing at least 40% of its power from renewable sources by 2030. In addition, future emissions from proposed coal-fired power plants would exceed India's climate commitment to reduce its 2005 emissions intensity 33% - 35% by 2030.

  1. Increasing flexibility of coal power plant by control system modifications

    Directory of Open Access Journals (Sweden)

    Marušić Ante

    2016-01-01

    Full Text Available Expanding implementation of intermittent renewable energy sources has already started to change the role of thermal power plants in energy systems across Europe. Traditionally base load plants are now forced to operate as peaking plants. A familiar transition in upcoming years is expected in Croatia and coal power plant operators are preparing accordingly. To evaluate cycling capabilities and control system operation for flexible operation of selected 210 MW coal plant, series of tests with different load gradients were performed and results were thoroughly analyzed. Two possible “bottlenecks” are identified, thermal stress in superheater header, and achievable ramping rate considering operational limitations of coal feeders, firing system and evaporator dynamics. Several unexpected readings were observed, usually caused by malfunctioning sensors and equipment, resulting in unexpected oscillations of superheated steam temperature. Based on superheater geometry and experimental data, maximal steam temperature gradient during ramping was evaluated. Since thermal stress was well inside the safety margins, the simulation model of the whole boiler was used to evaluate achievable ramping on electric side.

  2. Plasma Technologies of Solid Fuels Processing

    International Nuclear Information System (INIS)

    Karpenko, E.I.; Messerle, V.E.; Ustimenko, A.

    2003-01-01

    Use of fuel processing plasma technologies improves ecological and economical indexes of low-grade coal utilization at thermal power plants. This paper presents experimental plasma plant 70 k W of power and 11 kg per hour of coal productivity. On the base of material and heat balances integral indexes of the process of plasma gasification of Podmoskovny brown coal 48% of ash content were found. Synthesis gas with concentration 85.2% was got. Hydrogen concentration in the synthesis gas was higher than carbon monoxide one. Ratio H 2 :CO in synthesis gas was 1.4-1.5. It was shown that steam consumption and temperature of the process increase causes H 2 concentration and coal gasification degree increase. Fulfilled experiments and comparison of their result with theoretical investigations allowed creating pilot experimental plant for plasma processing of low-grade coals. The power of the pilot plant is 1000 k W and coal productivity is 300 kg/h. (author)

  3. Achievement report for fiscal 1993 on developing entrained bed coal gasification power plant. Part 1. Element research and technology survey edition; 1993 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 1. Youso kenkyu hen, gijutsu chosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    With an objective of establishing a coal gasification composite power generation technology, R and D works have been carried out on elementary technologies. This paper summarizes the achievements in fiscal 1993. In the research on the slag utilization technology, discussions were given on the applicability of slag discharged from a 200 t/d pilot plant to fine aggregate for concrete. In the research on a large gas turbine combustor for a demonstration plant, the test conditions were discussed and the reliability of the combustor was analyzed to conduct an actual gas combustion test using the coal D in continuation from the test in the previous fiscal year. In the research on the simulation of a composite power generation system, the simulation models were reviewed and corrected. Load variation simulations were carried out on every operation mode to have conducted comparison with and discussion on the actual plant data. In order to clarify the slagging phenomenon in the 200 t/d pilot plant, a characteristics test was performed by using a 2 t/d furnace. As a result, the combustor ash load and the dynamic pressure in the axial direction in the throat section were presumed to be the large factors for the occurrence of slagging. (NEDO)

  4. FY 1986 report on the committee of the Coal Gasification Committee; 1986 nendo sekitan gaska iinkai hon'iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    The paper reported on activities of the committee of the Coal Gasification Committee in FY 1986. In the 1st Committee Meeting, after selecting the chairperson, report/discussion were made about the outline of the FY 1986 coal gasification technology development plan. The distributed data were the outline of the development of an entrained bed coal gasification power plant, outline of the development of a 40t/d fluidized bed coal gasification plant, outline of the design of a 1,000t/d 100,000KW-class demonstrative plant, outline of the development of coal utilization hydrogen production technology, and outline of the development of high-calorie gas production technology. In the 2nd Committee Meeting, report/discussion were made about activities of each section of the committee and the state of progress of the development of coal gasification technology. The distributed data were those on the development of an entrained bed coal gasification power plant, development of a 40t/d fluidized bed coal gasification plant, design of a 1,000t/d 100,000KW-class demonstrative plant, and development of coal utilization hydrogen production technology (design/construction of pilot plant, study using small equipment). (NEDO)

  5. Mercury emission and speciation of coal-fired power plants in China

    Science.gov (United States)

    Wang, S. X.; Zhang, L.; Li, G. H.; Wu, Y.; Hao, J. M.; Pirrone, N.; Sprovieri, F.; Ancora, M. P.

    2010-02-01

    Comprehensive field measurements are needed to understand the mercury emissions from Chinese power plants and to improve the accuracy of emission inventories. Characterization of mercury emissions and their behavior were measured in six typical coal-fired power plants in China. During the tests, the flue gas was sampled simultaneously at inlet and outlet of Selective Catalytic Reduction (SCR), electrostatic precipitators (ESP), and flue gas desulfurization (FGD) using the Ontario Hydro Method (OHM). The pulverized coal, bottom ash, fly ash and gypsum were also sampled in the field. Mercury concentrations in coal burned in the measured power plants ranged from 17 to 385 μg/kg. The mercury mass balances for the six power plants varied from 87 to 116% of the input coal mercury for the whole system. The total mercury concentrations in the flue gas from boilers were at the range of 1.92-27.15 μg/m3, which were significantly related to the mercury contents in burned coal. The mercury speciation in flue gas right after the boiler is influenced by the contents of halogen, mercury, and ash in the burned coal. The average mercury removal efficiencies of ESP, ESP plus wet FGD, and ESP plus dry FGD-FF systems were 24%, 73% and 66%, respectively, which were similar to the average removal efficiencies of pollution control device systems in other countries such as US, Japan and South Korea. The SCR system oxidized 16% elemental mercury and reduced about 32% of total mercury. Elemental mercury, accounting for 66-94% of total mercury, was the dominant species emitted to the atmosphere. The mercury emission factor was also calculated for each power plant.

  6. Assessment of inhalation risk due to radioactivity released from coal-based thermal power plant

    International Nuclear Information System (INIS)

    Sahu, S.K.; Pandit, G.G.; Shukla, V.K.; Puranik, V.D.; Kushwaha, H.S.

    2006-01-01

    In India, the coal based thermal power plants have been the major source of power generation in the past and would continue for decades to come. As the coal contains naturally occurring primordial radionuclides the burning of pulverized coal to produce energy for generation of electricity in thermal power plants will result in the emission of a variety of natural radioactive elements into the environment in the vicinity of thermal power plants. In this paper we have used two different methods for characterization of uncertainty in inhalation risk to the general public around 10 Kms radius in the neighborhood of a coal-fired thermal power plant. (author)

  7. Influence of Coal Quality on Combustion Performance

    DEFF Research Database (Denmark)

    Lans, Robert Pieter Van Der; Glarborg, Peter; Dam-Johansen, Kim

    1998-01-01

    mixing pattern on NO formation under these conditions. Emissions from the opposed fired plant with all combustion air introduced through the burners could only be qualitatively reproduced by the pilot furnace. Under single stage conditions the test rig provided higher NO levels. Carbon in ash levels did...... not show any correlation between the coals and the furnaces. An engineering, mathematical model has been developed describing radiation heat transfer and coal combustion in full scale furnaces. The model has been validated against measured temperatures and the amount of carbon in fly ash. The model...

  8. Water Extraction from Coal-Fired Power Plant Flue Gas

    Energy Technology Data Exchange (ETDEWEB)

    Bruce C. Folkedahl; Greg F. Weber; Michael E. Collings

    2006-06-30

    The overall objective of this program was to develop a liquid disiccant-based flue gas dehydration process technology to reduce water consumption in coal-fired power plants. The specific objective of the program was to generate sufficient subscale test data and conceptual commercial power plant evaluations to assess process feasibility and merits for commercialization. Currently, coal-fired power plants require access to water sources outside the power plant for several aspects of their operation in addition to steam cycle condensation and process cooling needs. At the present time, there is no practiced method of extracting the usually abundant water found in the power plant stack gas. This project demonstrated the feasibility and merits of a liquid desiccant-based process that can efficiently and economically remove water vapor from the flue gas of fossil fuel-fired power plants to be recycled for in-plant use or exported for clean water conservation. After an extensive literature review, a survey of the available physical and chemical property information on desiccants in conjunction with a weighting scheme developed for this application, three desiccants were selected and tested in a bench-scale system at the Energy and Environmental Research Center (EERC). System performance at the bench scale aided in determining which desiccant was best suited for further evaluation. The results of the bench-scale tests along with further review of the available property data for each of the desiccants resulted in the selection of calcium chloride as the desiccant for testing at the pilot-scale level. Two weeks of testing utilizing natural gas in Test Series I and coal in Test Series II for production of flue gas was conducted with the liquid desiccant dehumidification system (LDDS) designed and built for this study. In general, it was found that the LDDS operated well and could be placed in an automode in which the process would operate with no operator intervention or

  9. FY 1989 report on the results of the development of the entrained bed coal gasification power plant. Support study for the development of the entrained bed coal gasification power plant; 1989 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu (Funryusho sekitan gaska hatsuden plant kaihatsu no shien kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-05-01

    For the purpose of supplying the data necessary for construction/operation/maintenance of system, gas turbine, etc. of the desulfurization/dust removal process to be adopted to a pilot plant of 200t/d entrained bed coal gasification power generation, support study was made using the Yubari 40t/d test equipment, and the FY 1989 results were summarized. As to the operation of the 40t/d gasification system, operation was stably continued, and also the system was able to feed gas to the wake device. In the high temperature dry desulfurization test, test was made on the following: structure of the sampling system of the continuous analyzer installed in the coal gas system and circulation gas system, load response corresponding control system, sequence control of the system for supplying reducing agent to SO{sub 2} reduction tower and the system for ash discharge, back washing of D-42 lift gas filter, etc. In the high temperature dry dust removal test, improvement in filtration material/dust separation performance, sequence control of the filtration material supply/discharge system, continuous dust densitometer, operational automation, etc. Through the tests, obtained were the results that are useful for the 200t/d plant. (NEDO)

  10. Cost-Effectiveness of Emission Reduction for the Indonesian Coal-Fired Power Plants

    NARCIS (Netherlands)

    Handayani, Kamia; Krozer, Yoram

    2014-01-01

    This paper presents the result of research on the cost-effectiveness of emission reduction in the selected coal-fired power plants (CFPPs) in Indonesia. The background of this research is the trend of more stringent environmental regulation regarding air emission from coal-fired power plants (CFPPs)

  11. Achievement report for fiscal 1994 on developing entrained bed coal gasification power plant. Part 1. Element research edition and technology survey edition; 1994 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 1. Youso kenkyu hen, gijutsu chosa hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    With an objective of establishing the coal gasification composite power generation technology, R and D has been carried out on the elementary technologies. This paper summarizes the achievements in fiscal 1994. In the research on the large gas turbine combustor for the demonstration plant, combustion tests were carried out by using the actual gas from the designed coal (coal D). In addition, the minimum gas flow rate test, fuel calory change test, and fuel switching test were performed from the viewpoint of evaluating the low load stability. Furthermore, in order to evaluate the combustion performance of the tested combustor, such tests were conducted as the combustor pressure loss characteristics test, bypass valve flow rate characteristics test, light oil ignition and light oil combustion test, and tests on the characteristics to switch from light oil to coal gas and the coal gas combustion characteristics. Evaluations were given on the NOx conversion rate, CO, THC, combustion efficiency, metal temperatures, pattern factors, pressure loss, internal pressure variation, and vibration stress. In the simulation research of the composite power generation system, the simulation models were varied according to the actual plant requirements in association with the progress of the tests on the pilot plant. The results of the simulations were reflected to the general load pressure control equipment. (NEDO)

  12. Relationship between Particle Size Distribution of Low-Rank Pulverized Coal and Power Plant Performance

    Directory of Open Access Journals (Sweden)

    Rajive Ganguli

    2012-01-01

    Full Text Available The impact of particle size distribution (PSD of pulverized, low rank high volatile content Alaska coal on combustion related power plant performance was studied in a series of field scale tests. Performance was gauged through efficiency (ratio of megawatt generated to energy consumed as coal, emissions (SO2, NOx, CO, and carbon content of ash (fly ash and bottom ash. The study revealed that the tested coal could be burned at a grind as coarse as 50% passing 76 microns, with no deleterious impact on power generation and emissions. The PSD’s tested in this study were in the range of 41 to 81 percent passing 76 microns. There was negligible correlation between PSD and the followings factors: efficiency, SO2, NOx, and CO. Additionally, two tests where stack mercury (Hg data was collected, did not demonstrate any real difference in Hg emissions with PSD. The results from the field tests positively impacts pulverized coal power plants that burn low rank high volatile content coals (such as Powder River Basin coal. These plants can potentially reduce in-plant load by grinding the coal less (without impacting plant performance on emissions and efficiency and thereby, increasing their marketability.

  13. Techno-economic Assessment of Coal to SNG Power Plant in Kalimantan

    Directory of Open Access Journals (Sweden)

    Riezqa Andika

    2016-09-01

    Full Text Available As the most abundant and widely distributed fossil fuel, coal has become a key component of energy sources in worldwide. However, air pollutants from coal power plants contribute carbon dioxide emissions. Therefore, understanding how to taking care coal in industrial point of view is important. This paper focused on the feasibility study, including process design and simulation, of a coal to SNG power plant in Kalimantan in order to fulfill its electricity demand. In 2019, it is estimated that Kalimantan will need 2446 MW of electricity and it reaches 2518 MW in 2024. This study allows a thorough evaluation both in technology and commercial point of view. The data for the model is gathered through literature survey from government institution reports and academic papers. Aspen HYSYS is used for modelling the power plant consists of two blocks which are SNG production block and power block. The economic evaluation is vary depends on the pay-back period, capital and operational cost which are coal price, and electricity cost. The results of this study can be used as support tool for energy development plan as well as policy-making in Indonesia.

  14. Small, modular, low-cost coal-fired power plants for the international market

    Energy Technology Data Exchange (ETDEWEB)

    Zauderer, B.; Frain, B.; Borck, B. [Coal Tech Corp., Merion Station, PA (United States); Baldwin, A.L. [Dept. of Energy, Pittsburgh, PA (United States). Pittsburgh Energy Technology Center

    1997-12-31

    This paper presents recent operating results of Coal Tech`s second generation, air cooled, slagging coal combustor, and its application to power plants in the 1 to 20 MW range. This 20 MMBtu/hour combustor was installed in a new demonstration plant in Philadelphia, PA in 1995. It contains the combustion components of a 1 MWe coal fired power plant, a 17,500 lb/hour steam boiler, coal storage and feed components, and stack gas cleanup components. The plant`s design incorporates improvements resulting from 2,000 hours of testing between 1987 and 1993 on a first generation, commercial scale, air cooled combustor of equal thermal rating. Since operations began in early 1996, a total of 51 days of testing have been successfully completed. Major results include durability of the combustor`s refractory wall, excellent combustion with high ash concentration in the fuel, removal of 95% to 100% of the slag in the combustor, very little ash deposition in the boiler, major reduction of in-plant parasitic power, and simplified power system control through the use of modular designs of sub-systems and computer control. Rapid fuel switching between oil, gas, and coal and turndown of up to a factor of three was accomplished. All these features have been incorporated in advanced coal fired plant designs in the 1 to 20 MWe range. Incremental capital costs are only $100 to $200/kW higher than comparable rated gas or oil fired steam generating systems. Most of its components and subsystems can be factory assembled for very rapid field installation. The low capital, low operating costs, fuel flexibility, and compatibility with very high ash fuels, make this power system very attractive in regions of the world having domestic supplies of these fuels.

  15. FY 1991 report on the results of the development of an entrained bed coal gasification power plant. Part 2. Support study for the development of an entrained bed coal gasification power plant (Summarization of the operation study); 1991 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu (Funryusho sekitan gaska hatsuden plant kaihatsu no shien kenkyu) - Sono 2. Unten kenkyu sokatsu hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-04-01

    The paper summarized the results of the following tests on a 40 t/d pilot plant which were conducted as the support study for the development of an entrained bed coal gasification power plant: dry desulfurization test, dry dedusting test, high-temperature NOx gas combustion test (gas turbine element test). In the dry desulfurization test, tested were the operational automation and monitoring technology, performance of desulfurization, characteristics of load response, sulfur recovery, etc. In the dry dedusting test, tested were the filter medium/dust separation, powder level meter, continuous dust densitometer, operational automation, characteristics of partial load/load response, improvement of filtration materials, test on characteristics of air conveyance, etc. In the high-temperature low-NOx gas combustion test (gas turbine element test), the following were conducted: examination of the test method of gas turbine materials, inspection/examination of the corrosion of gas turbine combustion test device, inspection/examination of the internal corrosion of the stationary blade for gas turbine deposit test, inspection/examination of gasification system. The results of these support studies were reflected one after another in the project on the development of an entrained bed coal gasification power plant. (NEDO)

  16. FY 1990 report on the results of the development of the entrained bed coal gasification power plant. Part 3. Fabrication/installation of pilot plant (Fabrication/installation drawings and fabrication/installation pictures - 2/2); 1990 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 3. Pilot plant seisaku suetsuke hen (Seisaku suetsukezu oyobi seisaku suetsuke shashin) (2/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, the fabrication, installation work, etc. were conducted of a 200t/d entrained bed coal gasification pilot plant, and fabrication/installation drawings and fabrication/installation pictures were summarized. In fabrication/installation drawings, drawings of the following were included: actual-pressure/actual-size combustor test equipment (structural drawing of exhaust temperature reducing device, structural drawing of hot air device, system diagram of piping, etc.), safety environmental equipment (total system diagram, layout of electric room equipment, layout of control equipment room, etc.), total control system (structural drawing of the total control system, front view of auxiliary panel of safety environment equipment, etc.), 66kV/6.9kV indoor switching station facilities (layout of equipment of indoor switching station facilities, outline drawing of the main transformer, outline drawing of gas circuit breaker, etc.), common facilities (total layout, diagram of the nitrogen gas pipe system, system diagram of utility equipment, etc.) In pictures of fabrication/installation, pictures of the following were included: state of the construction work, gasifier equipment, gas refining facilities, gas turbine facilities, actual-pressure/actual-size combustor test equipment, safety environmental equipment, total control system, 66kV/6.9kV indoor switching station facilities, common facilities. (NEDO)

  17. Emission of CO2 Gas and Radioactive Pollutant from Coal Fired Power Plant

    International Nuclear Information System (INIS)

    Ida, N.Finahari; Djati-HS; Heni-Susiati

    2006-01-01

    Energy utilization for power plant in Indonesia is still depending on burning fossil fuel such as coal, oil and gaseous fuel. The direct burning of coal produces CO 2 gas that can cause air pollution, and radioactive pollutant that can increase natural radioactive dosage. Natural radionuclide contained in coal is in the form of kalium, uranium, thorium and their decay products. The amount of CO 2 gas emission produced by coal fired power plant can be reduced by equipping the plant with waste-gas treatment facility. At this facility, CO 2 gas is reacted with calcium hydroxide producing calcium carbonate. Calcium carbonate then can be used as basic material in food, pharmaceutical and construction industries. The alternative method to reduce impact of air pollution is by replacing coal fuel with nuclear fuel or new and renewable fuel. (author)

  18. Appropriate feed-in tariff of solar–coal hybrid power plant for China’s Inner Mongolia Region

    International Nuclear Information System (INIS)

    Zhao, Yawen; Hong, Hui; Jin, Hongguang

    2016-01-01

    Highlights: • The potential for the first 10 MWe level solar–coal hybrid power plant is estimated. • Economic feasibility analysis is performed based on the discounted cash flow model. • The appropriate feed-in tariff prices of different scenarios are provided. • The results provide suggestions for the development of solar–coal hybrid technology. - Abstract: Middle-temperature solar heat can be used to preheat feed water before it enters the boiler in a coal-fired power plant. Previous studies have shown that this approach can improve the performance of coal-fired power plants. The present study estimates the first solar–coal hybrid power plant in the Inner Mongolia Region. It will have a potential net solar power output of 10 MW on the basis of the operating data of a traditional 200 MW coal-fired power plant. Economic feasibility analysis is then performed on the solar–coal hybrid power plant. The appropriate feed-in tariff prices are provided on the basis of different financing scenarios, solar field cost, collector area size, and other conditions. The results obtained in this study are expected to provide suggestions for the further development of solar–coal hybrid technology.

  19. A comparison of circulating fluidised bed combustion and gasification power plant technologies for processing mixtures of coal, biomass and plastic waste

    International Nuclear Information System (INIS)

    McIlveen-Wright, D.R.; Huang, Y.; McMullan, J.T.; Pinto, F.; Franco, C.; Gulyurtlu, I.; Armesto, L.; Cabanillas, A.; Caballero, M.A.; Aznar, M.P.

    2006-01-01

    Environmental regulations concerning emission limitations from the use of fossil fuels in large combustion plants have stimulated interest in biomass for electricity generation. The main objective of the present study was to examine the technical and economic viability of using combustion and gasification of coal mixed with biomass and plastic wastes, with the aim of developing an environmentally acceptable process to decrease their amounts in the waste stream through energy recovery. Mixtures of a high ash coal with biomass and/or plastic using fluidised bed technologies (combustion and gasification) were considered. Experiments were carried out in laboratory and pilot plant fluidised bed systems on the combustion and air/catalyst and air/steam gasification of these feedstocks and the data obtained were used in the techno-economic analyses. The experimental results were used in simulations of medium to large-scale circulating fluidised bed (CFB) power generation plants. Techno-economic analysis of the modelled CFB combustion systems showed efficiencies of around 40.5% (and around 46.5% for the modelled CFB gasification systems) when fuelled solely by coal, which were only minimally affected by co-firing with up to 20% biomass and/or wastes. Specific investments were found to be around $2150/kWe to $2400/kWe ($1350/kWe to $1450/kWe) and break-even electricity selling prices to be around $68/MWh to $78/MWh ($49/MWh to $54/MWh). Their emissions were found to be within the emission limit values of the large combustion plant directive. Fluidised bed technologies were found to be very suitable for co-firing coal and biomass and/or plastic waste and to offer good options for the replacement of obsolete or polluting power plants. (author)

  20. Mercury emission and speciation of coal-fired power plants in China

    Directory of Open Access Journals (Sweden)

    S. X. Wang

    2010-02-01

    Full Text Available Comprehensive field measurements are needed to understand the mercury emissions from Chinese power plants and to improve the accuracy of emission inventories. Characterization of mercury emissions and their behavior were measured in six typical coal-fired power plants in China. During the tests, the flue gas was sampled simultaneously at inlet and outlet of Selective Catalytic Reduction (SCR, electrostatic precipitators (ESP, and flue gas desulfurization (FGD using the Ontario Hydro Method (OHM. The pulverized coal, bottom ash, fly ash and gypsum were also sampled in the field. Mercury concentrations in coal burned in the measured power plants ranged from 17 to 385 μg/kg. The mercury mass balances for the six power plants varied from 87 to 116% of the input coal mercury for the whole system. The total mercury concentrations in the flue gas from boilers were at the range of 1.92–27.15 μg/m3, which were significantly related to the mercury contents in burned coal. The mercury speciation in flue gas right after the boiler is influenced by the contents of halogen, mercury, and ash in the burned coal. The average mercury removal efficiencies of ESP, ESP plus wet FGD, and ESP plus dry FGD-FF systems were 24%, 73% and 66%, respectively, which were similar to the average removal efficiencies of pollution control device systems in other countries such as US, Japan and South Korea. The SCR system oxidized 16% elemental mercury and reduced about 32% of total mercury. Elemental mercury, accounting for 66–94% of total mercury, was the dominant species emitted to the atmosphere. The mercury emission factor was also calculated for each power plant.

  1. Heavy metal atmospheric emissions from coal-fired power plants - Assessment and uncertainties

    International Nuclear Information System (INIS)

    Lecuyer, I.; Ungar, A.; Peter, H.; Karl, U.

    2004-01-01

    Power generation using fossil fuel combustion (coal and fuel-oil) participates, with other sectors, to heavy metal atmospheric emissions. The dispersion of these hazardous pollutants throughout the environment is more and more regulated. In order to assess the annual flows emitted from EDF coal-fired power plants, a computerized tool has been developed, based on the methodology defined by IFARE/DFIU in 1997. The heavy metal partition factors within the plant unit are determined according to the type of unit and the coal characteristics. Heavy metals output flows, and especially those emitted with flue gas at the stack, are then deduced from the actual coal consumption and chemical composition. A first inventory of heavy metal emissions from EDF coal-fired power plants has been achieved for year 2001. Values are accurate (± 40 %) for nonvolatile elements (Cr, Cu, Co, Mn, Ni, V) and for PM 10 and PM 2.5 (particulate matter below 10 μm and 2.5 μm). The uncertainty is higher (± 80 %) for volatile elements (As, Pb, Zn). Excess indicative values are given for elements which are both volatile and at low concentrations in coal (Hg, Se, Cd). (author)

  2. Coal-fired CCS demonstration plants, 2012

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-10-15

    The present report reviews activities taking place focused on the eventual large-scale deployment of carbon capture systems on coal-fired power plants. With this aim in mind, there are three main CO2 capture technology streams currently being developed and tested; these comprise pre-combustion capture, post-combustion capture, and systems based on oxyfuel technology. Although numerous other capture systems have been proposed, these three are currently the focus of most RD&D efforts and this report concentrates on these. More speculative technologies still at early stages in their development are not addressed. The overall aims of this report are to provide an update of recent technological developments in each of the main categories of CO2 capture, and to review the current state of development of each, primarily through an examination of larger-scale development activities taking place or proposed. However, where appropriate, data generated by smaller-scale testing is noted, especially where this is feeding directly into ongoing programmes aimed at developing further, or scaling-up the particular technology. Each is reviewed and the status of individual coal-based projects and proposals described. These are limited mainly to what are generally described as pilot and/or demonstration scale. Where available, learning experiences and operational data being generated by these projects is noted. Technology Readiness Levels (TRLs) of individual projects have been used to provide an indication of technology scale and maturity. For pre-combustion capture, post-combustion capture and oxyfuel systems, an attempt has been made to identify the technological challenges and gaps in the knowledge that remain, and to determine what technology developers are doing in terms of RD&D to address these. However, issues of commercial confidentiality have meant that in some cases, information in the public domain is limited, hence it has only been possible to identify overarching

  3. Leeuwpan fine coal dense medium plant

    CSIR Research Space (South Africa)

    Lundt, M

    2010-11-01

    Full Text Available Beneficiation 2010, 4–6 May 2010. 671The Journal of The Southern African Institute of Mining and Metallurgy VOLUME 110 NOVEMBER 2010 L Leeuwpan fine coal dense medium plant mixed with magnetite in the launder and enters... with production. Plant equipment operational changes Cyclone spigot changes In an attempt to lower the cut-point density, the spigot on the L 672 NOVEMBER 2010 VOLUME 110 The Journal of The Southern African Institute of Mining and Metallurgy Figure 1...

  4. The Bulgarian coal and the fluid bed technology

    International Nuclear Information System (INIS)

    Konstantinov, M.; Georgiev, J.; Lebedov, K.; Petrov, N.

    2000-01-01

    Because of low-quality of the most of Bulgarian coal and more rigorous ecological restrictions for decreasing of greenhouse gases the fluidized bed technology is the most appropriate combustion technology. A study with a pilot plant aiming to establish the values of technological parameters in view to maintain stable process of fluidized bed combustion at the specific burning characteristics of the Bulgarian coal was carried out. Coal of different quality and particle size production of 'Marbas' LTD mines were used. Series of experiments with batches of strictly determined content were carried out at minimal, average and maximal load. The technological factors as: layer's aerodynamics, layer's height, fuel's quantity and quantity of inert material were changed at each batch. The ecological factors were optimized considering coal's quality, plant's parameters, limestone's dosing and layer's aerodynamics. A regressive model for optimization of technological and ecological factors was created. An average coefficient of performance was achieved, resp. 82.27 % at combustion of coal from mines 'Maritsa-West' and 90 % from mine 'Lev'. A coefficient of sulfur oxides' capture 70 % was obtained at coal with sulfur content 3.1-3.9 %. In conclusion the fluidized bed technology is very suitable for combustion's characteristics of the Bulgarian coal

  5. Impacts of TMDLs on coal-fired power plants.

    Energy Technology Data Exchange (ETDEWEB)

    Veil, J. A.; Environmental Science Division

    2010-04-30

    The Clean Water Act (CWA) includes as one of its goals restoration and maintenance of the chemical, physical, and biological integrity of the Nation's waters. The CWA established various programs to accomplish that goal. Among the programs is a requirement for states to establish water quality standards that will allow protection of the designated uses assigned to each water body. Once those standards are set, state agencies must sample the water bodies to determine if water quality requirements are being met. For those water bodies that are not achieving the desired water quality, the state agencies are expected to develop total maximum daily loads (TMDLs) that outline the maximum amount of each pollutant that can be discharged to the water body and still maintain acceptable water quality. The total load is then allocated to the existing point and nonpoint sources, with some allocation held in reserve as a margin of safety. Many states have already developed and implemented TMDLs for individual water bodies or regional areas. New and revised TMDLs are anticipated, however, as federal and state regulators continue their examination of water quality across the United States and the need for new or revised standards. This report was funded by the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) Existing Plants Research Program, which has an energy-water research effort that focuses on water use at power plants. This study complements its overall research effort by evaluating water issues that could impact power plants. One of the program missions of the DOE's NETL is to develop innovative environmental control technologies that will enable full use of the Nation's vast coal reserves, while at the same time allowing the current fleet of coal-fired power plants to comply with existing and emerging environmental regulations. Some of the parameters for which TMDLs are being developed are components in discharges

  6. International technologies market for coal thermal power plants

    International Nuclear Information System (INIS)

    1998-01-01

    This paper reports a general framework of potential market of clean coal combustion technologies in thermal power plants, specially for commercialization and market penetration in developing countries [it

  7. Radiological impact from airborne routine discharges of Coal-Fired power plant

    International Nuclear Information System (INIS)

    Norasalwa Zakaria; Rohyiza Baan; Kathiravale, Sivapalan

    2010-01-01

    Radioactivity exists everywhere in nature. We are exposed to intense and continuous natural radiation coming from the sun, cosmic radiation, telluric radiation and even to the internal radiation of our own body. The fly ash emitted from burning coal for electricity by a power plant carries into the surrounding environment 100 times more radiation than a nuclear power plant producing the same amount of energy. This paper presents the information of studies on the radiological impact from airborne routine discharge of coal-fired power plants. (author)

  8. Summary of the research achievements in fiscal 1990 in developing coal liquefying technologies; Sekitan ekika gijutsu kaihatsu 1990 nendo kenkyu seika no gaiyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    This paper describes the summary of the research achievements in fiscal 1990 in developing coal liquefying technologies. The bituminous coal liquefaction project is scheduled to have a 150-t/d pilot plant start operation from the latter half of fiscal 1994. Research problems were reviewed based on the basic and detailed designs. Construction processes were also reviewed by each facility. Detailed design was performed on the main four facilities for pretreatment, liquefying reaction, liquefied oil distillation, and solvent hydrogenation. Support researches were carried out on the pilot plant in addition to 1-t/d PSU and small testing devices. In the research of a brown coal liquefying technology, operation of the pilot plant (50 t/d) was resumed after completion of the long-term operation (Run 7) having been executed in fiscal 1989, and after the extraordinary repair. The planned operation has been completed as scheduled. Modification and repair works were also carried out. Researches were made on upgrading of brown coal liquefied oil, and a petroleum mixing technology. The paper also describes the support researches. In developing the common basic technologies, studies were performed on development of plant devices, investigation on coal type selection, applications of coal liquefied products, and a refining technology. An environment preserving technology was also developed. The development made it possible to identify the whole image relative to the relevant laws and regulations on the comprehensive operation oil in the whole fraction and by fractions. Comprehensive management of the research and development was also implemented. (NEDO)

  9. Technologically enhanced natural radioactivity around the coal fired power plant

    International Nuclear Information System (INIS)

    Kovac, J.; Marovic, G.

    1997-01-01

    In some situations the exposure to natural radiation sources is enhanced as a result to technological developments. Burning of coal is one source of enhanced radiation exposure to naturally occurring elements, particularly radium, thorium and uranium. Most of the radioactive substances are concentrated in the ash and slag, which are heavy and drop to the bottom of a furnace. Lighter fly ash is carried up the chimney and into the atmosphere. The bottom ash and slag are usually deposited in a waste pile, from where some activity may leach into aquifers or be dispersed by wind.The main pathways through which the populations living around coal fired power plants are exposed to enhanced levels of natural radionuclides are inhalation and ingestion of the activity discharged into the Exosphere. For this reason, extensive investigations have been under way for several years in the coal fired power plant in Croatia, which uses an anthracite coal with a higher than usual uranium content. (authors)

  10. Denitrogenation and desulphurization during hydropyrolysis of coal in H{sub 2}/Ar plasma jet

    Energy Technology Data Exchange (ETDEWEB)

    Bao, W.; Zhang, J.; Shen, S.; Cao, Q.; Lu, Y. [Taiyuan University of Technology, Taiyuan (China)

    2007-03-15

    The denitrogenation and desulphurization during hydropyrolysis of six Chinese coals were systematically investigated in H{sub 2}/Ar plasma jet. The results from experiments show that HCN is the main product of coal-N at high temperature. Only a low amount of NH{sub 3} is formed. Yield of HCN depends on coal types and coal feeding rate, but NH{sub 3} does not change obviously. Yields of HCN and NH{sub 3} decrease with the increase of oxygen contents in coal during hydropyrolysis in H{sub 2}/Ar plasma jet. The change of feeding rate affects the formation of H{sub 2}S from the conversion of coal-S. The mole ratios of n(N)/n(C) and n(S)/n(C) in all char samples are less than that of coal. The results suggest that hydropyrolysis in H{sub 2}/Ar plasma jet is an efficient method for denitrogenation and desulphurization. In the present experimental conditions, the denitrogenation and desulphurization percentages reach up to 50% and 55% for Yanzhou coal, respectively. Yima coal can reach up to 40% and 60%. 11 refs., 3 figs., 3 tabs.

  11. Pilot and pilot-commercial plants for reprocessing spent fuels of FBR type reactors

    International Nuclear Information System (INIS)

    Shaldaev, V.S.; Sokolova, I.D.

    1988-01-01

    A review of modern state of investigations on the FBR mixed oxide uranium-plutonium fuel reprocessing abroad is given. Great Britain and France occupy the leading place in this field, operating pilot plants of 5 tons a year capacity. Technology of spent fuel reprocessing and specific features of certain stages of the technological process are considered. Projects of pilot and pilot-commercial plants of Great Britain, France, Japan, USA are described. Economic problems of the FBR fuel reprocessing are touched upon

  12. Fiscal 1998 research report. Improvement project of low-grade coals in Chongqing City, China for CO{sub 2} reduction (Feasibility study on the production business of coal- biomass briquette); 1998 nendo chosa hokokusho. CO{sub 2} sakugen no tame no Chuka Jinmin Kyowakoku Jukei chokkatsushi no teihin'i sekitanshitsu no kaizen project (Bio briquette seizo jigyo no chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Feasibility study was made on the effect of introduction of production technology of coal-biomass briquette (Japanese coal improvement technology) in Chongqing City on reduction of greenhouse effect gases and acid rain causative substances, and sustainable economic growth. The study result on the feasibility of this project and reduction of greenhouse effect gases was summarized. In this feasibility study, Japan-China joint field survey, and both proximate and ultimate analyses of obtained raw materials were carried out. Based on the experimental result in the pilot briquette plant in Chongqing City, study was made on the necessary of the 1 Mtons/y class pilot plant in the pilot area including Nantong coal mine in Chongqing City, and the location, investment, production cost and distribution means of the plant. Based on the evaluation result on CO{sub 2} reduction effect, economical efficiency, environment effect and social effect, its urgency and effectiveness as international cooperation project by yen credit were also confirmed. It is extremely important to promote localization of the plant in the future. (NEDO)

  13. Fiscal 1998 research report. Improvement project of low-grade coals in Chongqing City, China for CO{sub 2} reduction (Feasibility study on the production business of coal- biomass briquette); 1998 nendo chosa hokokusho. CO{sub 2} sakugen no tame no Chuka Jinmin Kyowakoku Jukei chokkatsushi no teihin'i sekitanshitsu no kaizen project (Bio briquette seizo jigyo no chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Feasibility study was made on the effect of introduction of production technology of coal-biomass briquette (Japanese coal improvement technology) in Chongqing City on reduction of greenhouse effect gases and acid rain causative substances, and sustainable economic growth. The study result on the feasibility of this project and reduction of greenhouse effect gases was summarized. In this feasibility study, Japan-China joint field survey, and both proximate and ultimate analyses of obtained raw materials were carried out. Based on the experimental result in the pilot briquette plant in Chongqing City, study was made on the necessary of the 1 Mtons/y class pilot plant in the pilot area including Nantong coal mine in Chongqing City, and the location, investment, production cost and distribution means of the plant. Based on the evaluation result on CO{sub 2} reduction effect, economical efficiency, environment effect and social effect, its urgency and effectiveness as international cooperation project by yen credit were also confirmed. It is extremely important to promote localization of the plant in the future. (NEDO)

  14. ECONOMICS AND FEASIBILITY OF RANKINE CYCLE IMPROVEMENTS FOR COAL FIRED POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    Richard E. Waryasz; Gregory N. Liljedahl

    2004-09-08

    ALSTOM Power Inc.'s Power Plant Laboratories (ALSTOM) has teamed with the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL), American Electric Company (AEP) and Parsons Energy and Chemical Group to conduct a comprehensive study evaluating coal fired steam power plants, known as Rankine Cycles, equipped with three different combustion systems: Pulverized Coal (PC), Circulating Fluidized Bed (CFB), and Circulating Moving Bed (CMB{trademark}). Five steam cycles utilizing a wide range of steam conditions were used with these combustion systems. The motivation for this study was to establish through engineering analysis, the most cost-effective performance potential available through improvement in the Rankine Cycle steam conditions and combustion systems while at the same time ensuring that the most stringent emission performance based on CURC (Coal Utilization Research Council) 2010 targets are met: > 98% sulfur removal; < 0.05 lbm/MM-Btu NO{sub x}; < 0.01 lbm/MM-Btu Particulate Matter; and > 90% Hg removal. The final report discusses the results of a coal fired steam power plant project, which is comprised of two parts. The main part of the study is the analysis of ten (10) Greenfield steam power plants employing three different coal combustion technologies: Pulverized Coal (PC), Circulating Fluidized Bed (CFB), and Circulating Moving Bed (CMB{trademark}) integrated with five different steam cycles. The study explores the technical feasibility, thermal performance, environmental performance, and economic viability of ten power plants that could be deployed currently, in the near, intermediate, and long-term time frame. For the five steam cycles, main steam temperatures vary from 1,000 F to 1,292 F and pressures from 2,400 psi to 5,075 psi. Reheat steam temperatures vary from 1,000 F to 1,328 F. The number of feedwater heaters varies from 7 to 9 and the associated feedwater temperature varies from 500 F to 626 F. The main part of the

  15. Synfuels from low-rank coals at the Great Plains Gasification Plant

    International Nuclear Information System (INIS)

    Pollock, D.

    1992-01-01

    This presentation focuses on the use of low rank coals to form synfuels. A worldwide abundance of low rank coals exists. Large deposits in the United States are located in Texas and North Dakota. Low rank coal deposits are also found in Europe, India and Australia. Because of the high moisture content of lignite ranging from 30% to 60% or higher, it is usually utilized in mine mouth applications. Lignite is generally very reactive and contains varying amounts of ash and sulfur. Typical uses for lignite are listed. A commercial application using lignite as feedstock to a synfuels plant, Dakota Gasification Company's Great Plains Gasification Plant, is discussed

  16. Coal-fired power plant: airborne routine discharges

    International Nuclear Information System (INIS)

    Zeevaert, T.

    2005-01-01

    The radiological impact from non-nuclear industries is a growing matter of concern to stake holders and regulators. It has been demonstrated that atmospheric discharges from coal-fired power plants can lead to higher dose-impacts to critical groups of the population than nuclear power plants. In Belgium, in the frame of an agreement between electricity producers and national authorities, measures were taken in conventional power plants to restrict airborne discharges of SO 2 , NO x and suspended particles. In the 500 MWe coal-fired power plant of Langerlo, a flue gas purification system was installed, consisting of a denitrification unit and a desulphurization unit, next to the electrostatic dust filter units. These measures have also an important effect on the radioactive atmospheric discharges. The objective of this study was to assess the radiological impact of the airborne releases of the power plant under normal working conditions and in particular the influence of the installation of the flue gas purification system. As a first step, we measured the natural radioactivity content of the coal and the radium content of the fly ash . The quantities of the other radioelements discharged through the chimney, were estimated, assuming the same behaviour as radium, except for the more volatile lead and polonium, which will condense preferably on finer ash particles, against which the electro filters are less effective. (A concentration factor of 4 has been adopted). The radon, present in the coal, is assumed to be discharged completely through the chimney. The atmospheric transport, dispersion and deposition of the discharged radionuclides were modelled, applying the bi-Gaussian plume model IFDM. For the calculations, we used hourly averages of the meteorological observations at Mol over the year 1991. The transfers of the radionuclides from air and soil to the biospheric media, exposing man, were calculated with our biosphere model and the radiological impact to the

  17. FY 1989 report on the section meeting of gasification technology of the Coal Gasification Committee; 1989 nendo sekitan gasuka iinkai gasuka gijutsu bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    The paper reported activities of the Coal Gasification Committee in FY 1989. The 1st Coal Gasification Committee Meeting was held on July 21,1989, and report/discussion were made about an outline of the FY 1989 research plan. In the 2nd Meeting, report/discussion were made about activities of each of the section meetings and the progress of the development of coal gasification technology. In FY 1998, as the 4th design/construction of pilot plant, manufacture/installation were conducted of a part (equipment of coal supply system/char recycle system) of the gasification process equipment/facilities. As to recycle gas facilities, manufacture of equipment/facilities was conducted. Concerning a part of the pipe rack/central control panel/electric panel, manufacture/installation of equipment were made. In the support study of a pilot plant (trial development of materials for plant use equipment), refractory was studied in terms of the evaluation of durability of furnace materials against liquefaction residue slag, study of furnace materials responsive to liquefaction residue and gasification of high ash melting point coal, etc. (NEDO)

  18. Natural radioactivity around the coal-fired power plant

    International Nuclear Information System (INIS)

    Kovac, J.; Bajlo, M.

    1996-01-01

    By far the greatest part of the radiation received by the worlds population comes from natural sources, in some situations the exposure to natural radiation sources is enhanced as a result of technological developments. Burning of coal is one source of enhanced radiation exposure to naturally occurring elements, particularly radium, thorium and uranium. Extensive investigations have been performed in the coal-fired power plant (CFPP) Plomin in Croatia, using an anthracite coal with a higher than usual uranium content and normal thorium content. A network of TL dosimeters (TLD), working levels (WL) measurements, air pollution monitoring and monitoring of waste pile were organized. Some of the measurements have been repeated, and the results have shown decreased contamination. (author)

  19. Status of health and environmental research relative to direct coal liquefaction: 1976 to the present

    Energy Technology Data Exchange (ETDEWEB)

    Gray, R.H.; Cowser, K.E. (eds.)

    1982-06-01

    This document describes the status of health and environmental research efforts, supported by the US Department of Energy (DOE), to assist in the development of environmentally acceptable coal liquefaction processes. Four major direct coal liquefaction processes are currently in (or have been investigated at) the pilot plant stage of development. Two solvent refined coal processes (SRC-I and -II), H-coal (a catalytic liquefaction process) and Exxon donor solvent (EDS). The Pacific Northwest Laboratory was assigned responsibility for evaluating SRC process materials and prepared comprehensive health and environmental effects research program plans for SRC-I and -II. A similar program plan was prepared for H-coal process materials by the Oak Ridge National Laboratory. A program has been developed for EDS process materials by Exxon Research and Engineering Co. The program includes short-term screening of coal-derived materials for potential health and ecological effects. Longer-term assays are used to evaluate materials considered most representative of potential commercial practice and with greatest potential for human exposure or release to the environment. Effects of process modification, control technologies and changing operational conditions on potential health and ecological effects are also being evaluated. These assessments are being conducted to assist in formulating cost-effective environmental research programs and to estimate health and environmental risks associated with a large-scale coal liquefaction industry. Significant results of DOE's health and environmental research efforts relative to coal liquefaction include the following: chemical characterization, health effects, ecological fate and effects, amelioration and risk assessment.

  20. Total generating costs: coal and nuclear plants

    International Nuclear Information System (INIS)

    1979-02-01

    The study was confined to single and multi-unit coal- and nuclear-fueled electric-generating stations. The stations are composed of 1200-MWe PWRs; 1200-MWe BWRs; 800-and 1200-MWe High-Sulfur Coal units, and 800- and 1200-MWe Low-Sulfur Coal units. The total generating cost estimates were developed for commercial operation dates of 1985 and 1990; for 5 and 8% escalation rates, for 10 and 12% discount rates; and, for capacity factors of 50, 60, 70, and 80%. The report describes the methodology for obtaining annualized capital costs, levelized coal and nuclear fuel costs, levelized operation and maintenance costs, and the resulting total generating costs for each type of station. The costs are applicable to a hypothetical Middletwon site in the Northeastern United States. Plant descriptions with general design parameters are included. The report also reprints for convenience, summaries of capital cost by account type developed in the previous commercial electric-power cost studies. Appropriate references are given for additional detailed information. Sufficient detail is given to allow the reader to develop total generating costs for other cases or conditions

  1. ANN-GA based optimization of a high ash coal-fired supercritical power plant

    International Nuclear Information System (INIS)

    Suresh, M.V.J.J.; Reddy, K.S.; Kolar, Ajit Kumar

    2011-01-01

    Highlights: → Neuro-genetic power plant optimization is found to be an efficient methodology. → Advantage of neuro-genetic algorithm is the possibility of on-line optimization. → Exergy loss in combustor indicates the effect of coal composition on efficiency. -- Abstract: The efficiency of coal-fired power plant depends on various operating parameters such as main steam/reheat steam pressures and temperatures, turbine extraction pressures, and excess air ratio for a given fuel. However, simultaneous optimization of all these operating parameters to achieve the maximum plant efficiency is a challenging task. This study deals with the coupled ANN and GA based (neuro-genetic) optimization of a high ash coal-fired supercritical power plant in Indian climatic condition to determine the maximum possible plant efficiency. The power plant simulation data obtained from a flow-sheet program, 'Cycle-Tempo' is used to train the artificial neural network (ANN) to predict the energy input through fuel (coal). The optimum set of various operating parameters that result in the minimum energy input to the power plant is then determined by coupling the trained ANN model as a fitness function with the genetic algorithm (GA). A unit size of 800 MWe currently under development in India is considered to carry out the thermodynamic analysis based on energy and exergy. Apart from optimizing the design parameters, the developed model can also be used for on-line optimization when quick response is required. Furthermore, the effect of various coals on the thermodynamic performance of the optimized power plant is also determined.

  2. Occupational exposures during routine activities in coal-fueled power plants

    Energy Technology Data Exchange (ETDEWEB)

    Mona J. Bird; David L. MacIntosh; Phillip L. Williams [University of Georgia, Athens, GA (United States). Dept. of Environmental Health Science

    2004-06-15

    Limited information is available on occupational exposures during routine, nonoutage work activities in coal-fueled power plants. This study evaluated occupational exposures to the principal contaminants in the facilities, including respirable dust (coal dust), arsenic, noise, asbestos, and heat stress. The data were collected over a 3-month period, during the summer of 2001, in 5 representative power plants of a large southeastern power-generating company. From 4 of the 5 facilities, 392 air samples and 302 noise samples were collected with approximately 50 respirable coal dust, 32 arsenic, 15 asbestos, and 70 noise samples from each of the 4 plants. One of the previously surveyed facilities was also evaluated for heat stress, and 1 additional coal-fueled power plant was surveyed for a total of 20 personal heat stress samples. Of the nearly 400 air samples collected, only 1 exceeded the allowable occupational exposure value. For the noise samples, 55 were equal to or greater than the Occupational Safety and Health Administration (OSHA) 8-hour hearing conservation program level of 85 dBA, and 12 were equal to or greater than the OSHA 8-hour permissible exposure level of 90 dBA. The data concluded that some work sites were above the heat stress ceiling values recommended by the National Institute for Occupational Safety and Health (NIOSH). Four of the 20 employees personally monitored exceeded the recommended limits for heart rate or body core temperature.

  3. Ningyo Toge uranium enrichment pilot plant comes into full

    International Nuclear Information System (INIS)

    1982-01-01

    The uranium enrichment pilot plant of the Power Reactor and Nuclear Fuel Development Corporation at Ningyo Toge went into full operation on March 26, 1982. This signifies that the front end of the nuclear fuel cycle in Japan, from uranium ore to enrichment, is only a step away from commercialization. On the same day, the pilot plant of uranium processing and conversion to UF 6 , the direct purification of uranium ore into uranium hexafluoride, began batch operation at the same works. The construction of the uranium enrichment pilot plant has been advanced in three stages: i.e. OP-1A with 1000 centrifuges, OP-1B with 3000 centrifuges and OP-2 with 3000 centrifuges. With a total of 7000 centrifuges, the pilot plant, the first enrichment plant in Japan, has now a capacity of supplying enriched uranium for six months operation of a 1,000 MW nuclear power plant. (J.P.N.)

  4. Development of life cycle water-demand coefficients for coal-based power generation technologies

    International Nuclear Information System (INIS)

    Ali, Babkir; Kumar, Amit

    2015-01-01

    Highlights: • We develop water consumption and withdrawals coefficients for coal power generation. • We develop life cycle water footprints for 36 coal-based electricity generation pathways. • Different coal power generation technologies were assessed. • Sensitivity analysis of plant performance and coal transportation on water demand. - Abstract: This paper aims to develop benchmark coefficients for water consumption and water withdrawals over the full life cycle of coal-based power generation. This study considered not only all of the unit operations involved in the full electricity generation life cycle but also compared different coal-based power generating technologies. Overall this study develops the life cycle water footprint for 36 different coal-based electricity generation pathways. Power generation pathways involving new technologies of integrated gasification combined cycle (IGCC) or ultra supercritical technology with coal transportation by conventional means and using dry cooling systems have the least complete life cycle water-demand coefficients of about 1 L/kW h. Sensitivity analysis is conducted to study the impact of power plant performance and coal transportation on the water demand coefficients. The consumption coefficient over life cycle of ultra supercritical or IGCC power plants are 0.12 L/kW h higher when conventional transportation of coal is replaced by coal-log pipeline. Similarly, if the conventional transportation of coal is replaced by its transportation in the form of a slurry through a pipeline, the consumption coefficient of a subcritical power plant increases by 0.52 L/kW h

  5. Report for fiscal 1994 by gasification technology subcommittee, Coal Gasification Committee; 1994 nendo sekitan gas ka iinkai gas ka gijutsu bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    As the result of a RUN-9 operation in the research on technologies for hydrogen production from coal and for pilot plants, it is found that the Muswellbrook, Datong, and Blair Athol coals are all suitable for gasification in pilot plants. Their handlability is considerably improved when the grain sizes after crushing are allowed to remain coarse (with the Blair Athol coal still retaining some disadvantage). A concept design is prepared for a HYCOL (hydrogen from coal) process demonstration plant. The reference coal is an imported coal similar to the Taiheiyo coal, and the hydrogen production target is set at 1-million m{sup 3}N/d (590t/d in terms of Taiheiyo coal) and hydrogen purity at 95% or higher. The whole process consists of coal gasification (with oxygen serving as gasification agent), dedusting, conversion to CO, desulfurization and decarboxylation (recovery of sulfur), and methanation. The gasification furnace is a 1-chamber entrained bed type with a 2-stage gyration flow. Dried and pulverized coal is conveyed aboard an air flow into the gasification furnace, where it is thrown into partial combustion reaction with the gasification agent for gasification in a high-temperature zone (1,500-1,600 degrees C), and the ash is taken out as slag. The generated gas is cooled in a heat recovery boiler, dedusted in a cyclone dust filter, and then forwarded to the washing unit. (NEDO)

  6. Catalytic Unmixed Combustion of Coal with Zero Pollution

    Energy Technology Data Exchange (ETDEWEB)

    George Rizeq; Parag Kulkarni; Raul Subia; Wei Wei

    2005-12-01

    GE Global Research is developing an innovative energy-based technology for coal combustion with high efficiency and near-zero pollution. This Unmixed Combustion of coal (UMC-Coal) technology simultaneously converts coal, steam and air into two separate streams of high pressure CO{sub 2}-rich gas for sequestration, and high-temperature, high-pressure vitiated air for producing electricity in gas turbine expanders. The UMC process utilizes an oxygen transfer material (OTM) and eliminates the need for an air separation unit (ASU) and a CO{sub 2} separation unit as compared to conventional gasification based processes. This is the final report for the two-year DOE-funded program (DE-FC26-03NT41842) on this technology that ended in September 30, 2005. The UMC technology development program encompassed lab- and pilot-scale studies to demonstrate the UMC concept. The chemical feasibility of the individual UMC steps was established via lab-scale testing. A pilot plant, designed in a related DOE funded program (DE-FC26-00FT40974), was reconstructed and operated to demonstrate the chemistry of UMC process in a pilot-scale system. The risks associated with this promising technology including cost, lifetime and durability OTM and the impact of contaminants on turbine performance are currently being addressed in detail in a related ongoing DOE funded program (DE-FC26-00FT40974, Phase II). Results obtained to date suggest that this technology has the potential to economically meet future efficiency and environmental performance goals.

  7. Efficiency and environmental impacts of electricity restructuring on coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Chan, H. Ron [Maryland Univ., College Park, MD (United States). Dept. of Economics; Fell, Harrison [Colorado School of Mines, Golden, CO (United States). Division of Economics and Business; Lange, Ian [Stirling Univ. (United Kingdom). Division of Economics; Li, Shanjun [Cornell Univ., Ithaca, NY (United States). Dyson School of Applied Economics and Management

    2013-03-15

    We investigate the impacts of electricity market restructuring on fuel efficiency, utilization and, new to this area, cost of coal purchases among coal-fired power plants using a panel data set from 1991 to 2005. Our study focuses exclusively on coal-fired power plants and uses panel data covering several years after implementation of restructuring. The estimation compares how investor-owned (IOs) plants in states with restructuring changed their behavior relative to IOs in states without. Our analysis finds that restructuring led to: (1) a two percent improvement in fuel efficiency for IOs, (2) a ten percent decrease in unit cost of heat input, and (3) a lower capacity factor even after adjusting for cross-plant generation re-allocation due to cost reductions. Based on these estimates, back-of-the-envelope calculations find that restructuring has led to about 6.5 million dollars in annual cost savings or nearly 12 percent of operating expenses and up to a 7.6 percent emissions reduction per plant.

  8. Environmental procedures for thermoelectric power plants by national mineral coal

    International Nuclear Information System (INIS)

    Serra, M.T.F.; Verney Gothe, C.A. de; Silva Ramos, R. da

    1990-01-01

    This paper presents the environmental impacts decursive of utilization of South-Brazilian mineral coal to generation of electric energy. This environmental impacts and alternatives of attenuating measures are presented and evaluated, containing the totality of productive cycle: mining, processing, transport, stock piling and use in thermoelectric power plants. Environmental procedures are systematized for first time, in order to be observed in whole expansion of coal thermoelectric generator park. The conception of power plants and site studies of their useful lives are also included. (C.M.). 19 figs, 24 tabs

  9. Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, S.M.; Sands, M.D.; Donat, J.R.; Jepsen, P.; Smookler, M.; Villa, J.F.

    1981-02-01

    This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed action will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)

  10. Development of 1000kW-class MCFC pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    Ooue, M.; Yasue, H. [MCFC Research Association, Mie (Japan); Takasu, K.; Tsuchitori, T.

    1996-12-31

    This pilot plant is a part of the New Sunshine Program which has proceeded by the Agency of Industrial Science and Technology of the Ministry of International Trade and Industry. MCFC Research Association is entrusted with the development of the pilot plant, and constructing it at Kawagoe site. Following items will be verified by this pilot plant operation. (a) Development of 250kW class stack and confirmation of stack performance and decay rate. (b) System verification such as basic process, control system and operation characteristics, toward commercialization. (c) To get design data for demonstration plant.

  11. Partitioning of selected trace elements in coal combustion products from two coal-burning power plants in the United States

    Science.gov (United States)

    Swanson, Sharon M.; Engle, Mark A.; Ruppert, Leslie F.; Affolter, Ronald H.; Jones, Kevin B.

    2013-01-01

    Samples of feed coal (FC), bottom ash (BA), economizer fly ash (EFA), and fly ash (FA) were collected from power plants in the Central Appalachian basin and Colorado Plateau to determine the partitioning of As, Cr, Hg, Pb, and Se in coal combustion products (CCPs). The Appalachian plant burns a high-sulfur (about 3.9 wt.%) bituminous coal from the Upper Pennsylvanian Pittsburgh coal bed and operates with electrostatic precipitators (ESPs), with flue gas temperatures of about 163 °C in the ESPs. At this plant, As, Pb, Hg, and Se have the greatest median concentrations in FA samples, compared to BA and EFA. A mass balance (not including the FGD process) suggests that the following percentages of trace elements are captured in FA: As (48%), Cr (58%), Pb (54%), Se (20%), and Hg (2%). The relatively high temperatures of the flue gas in the ESPs and low amounts of unburned C in FA (0.5% loss-on-ignition for FA) may have led to the low amount of Hg captured in FA. The Colorado Plateau plant burns a blend of three low-S (about 0.74 wt.%) bituminous coals from the Upper Cretaceous Fruitland Formation and operates with fabric filters (FFs). Flue gas temperatures in the baghouses are about 104 °C. The elements As, Cr, Pb, Hg, and Se have the greatest median concentrations in the fine-grained fly ash product (FAP) produced by cyclone separators, compared to the other CCPs at this plant. The median concentration of Hg in FA (0.0983 ppm) at the Colorado Plateau plant is significantly higher than that for the Appalachian plant (0.0315 ppm); this higher concentration is related to the efficiency of FFs in Hg capture, the relatively low temperatures of flue gas in the baghouses (particularly in downstream compartments), and the amount of unburned C in FA (0.29% loss-on-ignition for FA).

  12. Development of second-generation PFB combustion plants

    Energy Technology Data Exchange (ETDEWEB)

    Robertson, A.; Domeracki, W.; Horazak, D. [and others

    1995-12-31

    Research is being conducted under United States Department of Energy (USDOE) Contract DE-AC21-86MC21023 to develop a new type of coal-fueled plant for electric power generation. This new type of plant--called an Advanced or Second-generation Pressurized Fluidized Bed Combustion (APFBC) plant--offers the promise of efficiencies greater than 45 percent (HHV), with both emissions and a cost of electricity that are significantly lower than conventional pulverized-coal-fired plants with scrubbers. This paper summarizes the pilot-plant R&D work being conducted to develop this new type of plant and discusses a proposed design that should reduce demonstration-plant risks and costs.

  13. TVA coal-gasification commercial demonstration plant project. Volume 5. Plant based on Koppers-Totzek gasifier. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    This volume presents a technical description of a coal gasification plant, based on Koppers-Totzek gasifiers, producing a medium Btu fuel gas product. Foster Wheeler carried out a conceptual design and cost estimate of a nominal 20,000 TPSD plant based on TVA design criteria and information supplied by Krupp-Koppers concerning the Koppers-Totzek coal gasification process. Technical description of the design is given in this volume.

  14. A new proposed approach for future large-scale de-carbonization coal-fired power plants

    International Nuclear Information System (INIS)

    Xu, Gang; Liang, Feifei; Wu, Ying; Yang, Yongping; Zhang, Kai; Liu, Wenyi

    2015-01-01

    The post-combustion CO 2 capture technology provides a feasible and promising method for large-scale CO 2 capture in coal-fired power plants. However, the large-scale CO 2 capture in conventionally designed coal-fired power plants is confronted with various problems, such as the selection of the steam extraction point and steam parameter mismatch. To resolve these problems, an improved design idea for the future coal-fired power plant with large-scale de-carbonization is proposed. A main characteristic of the proposed design is the adoption of a back-pressure steam turbine, which extracts the suitable steam for CO 2 capture and ensures the stability of the integrated system. A new let-down steam turbine generator is introduced to retrieve the surplus energy from the exhaust steam of the back-pressure steam turbine when CO 2 capture is cut off. Results show that the net plant efficiency of the improved design is 2.56% points higher than that of the conventional one when CO 2 capture ratio reaches 80%. Meanwhile, the net plant efficiency of the improved design maintains the same level to that of the conventional design when CO 2 capture is cut off. Finally, the match between the extracted steam and the heat demand of the reboiler is significantly increased, which solves the steam parameter mismatch problem. The techno-economic analysis indicates that the proposed design is a cost-effective approach for the large-scale CO 2 capture in coal-fired power plants. - Highlights: • Problems caused by CO 2 capture in the power plant are deeply analyzed. • An improved design idea for coal-fired power plants with CO 2 capture is proposed. • Thermodynamic, exergy and techno-economic analyses are quantitatively conducted. • Energy-saving effects are found in the proposed coal-fired power plant design idea

  15. The economics of coal and nuclear power plants

    International Nuclear Information System (INIS)

    Prior, M.J.

    1978-01-01

    This paper is largely based on a comparison of electrical generating costs from coal-fired power plants and thermal nuclear reactors. Following an introductory section, the subject is considered under the following headings: methodology; cost basis (capital costs, fuel costs, plant factors); generating costs; the fast breeder reactor -general issues; the economics of fast breeder reactors; conclusions and questions. (U.K.)

  16. Refining and end use study of coal liquids I - pilot plant studies

    Energy Technology Data Exchange (ETDEWEB)

    Erwin, J.; Moulton, D.S.

    1995-12-31

    The Office of Fossil Energy, Pittsburgh Energy Technology Center is examining the ways in which coal liquids may best be integrated into the refinery of the 2000-2015 time frame and what performance and emission properties will prevail among the slate of fuels produced. The study consists of a Basic Program administered by Bechtel Group, Inc. to build a linear programming refinery model and provide processing and fuel properties data through subcontractors Southwest Research Institute, Amoco Oil R&D, and M.W. Kellogg Company. The model will be used in an Option 1 to devise a slate of test fuels meeting advanced specifications, which will be produced and tested for physical ASTM-type properties, engine performance, and vehicle emissions. Three coal liquids will be included: a direct liquid from bituminous coal, another from subbituminous, and a Fischer-Tropsch indirect liquefaction product. This paper reports the work to date on fractions of the first direct liquid including naphtha hydrotreating, heavy distillate hydrotreating, FCC of the heavy distillate hydrotreater products. Also reported are the first stages of work on the indirect liquefaction wax including feed preparation and FCC tests of blends with petroleum FCC feed.

  17. Environmental impacts of coal and nuclear power plants

    International Nuclear Information System (INIS)

    Carvalho, W.B.D. de; Souza, J.A.M. de

    1981-01-01

    The present work analyses the environmental impacts of coal and nuclear power plants. A comparison is made on a common basis considering the various activities involving the complete fuel cycle for both cases. (Author) [pt

  18. Report on results of R and D of coal liquefaction technology in fiscal 1981; 1981 nendo sekitan ekika gijutsu no kenkyu kaihatsu seika setsumeisho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    This paper explains the results of development of coal liquefaction technology under the Sunshine Project in fiscal 1981. In connection with solvent extraction and liquefaction, an 1 t/day experimental plant was completed for bituminous coals and operated continuously for 153 hours. An examination also started for the development of a 250 t/day pilot plant. As the element studies, R and D is in progress on the solvent extraction and liquefaction process, solid-liquid separation, secondary hydrogenation, and plant materials. In brown coals, the construction work of a 50 t/day pilot plant started for the purpose of establishing liquefaction technology for brown coal in Victoria State, Australia, with a part of the equipment manufactured. As the element studies, research was conducted on primary hydrogenation, deliming, secondary hydrogenation, dehydration and catalysts. In solvolysis liquefaction, a short-time concluding liquefaction reaction was continuously performed by a plant of 1 t/day scale. In direct hydro-liquefaction, a 2.4 t/day experimental plant was constructed, with the element studies conducted successively. In other words, researches were carried out by the bench scale plant on liquefaction, solid-liquid separation, iron-based catalysts, catalyst and reutilization, motive force recovery system by hydrohoist, and effect of preheating and deaeration. (NEDO)

  19. Advanced gasifier and water gas shift technologies for low cost coal conversion to high hydrogen syngas

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, Andrew Kramer [Gas Technology Inst., Des Plaines, IL (United States)

    2016-09-30

    The Gas Technology Institute (GTI) and team members RTI International (RTI), Coanda Research and Development, and Nexant, are developing and maturing a portfolio of technologies to meet the United States Department of Energy (DOE) goals for lowering the cost of producing high hydrogen syngas from coal for use in carbon capture power and coal-to-liquids/chemicals. This project matured an advanced pilot-scale gasifier, with scalable and commercially traceable components, to readiness for use in a first-of-a-kind commercially-relevant demonstration plant on the scale of 500-1,000 tons per day (TPD). This was accomplished through cold flow simulation of the gasifier quench zone transition region at Coanda and through an extensive hotfire gasifier test program on highly reactive coal and high ash/high ash fusion temperature coals at GTI. RTI matured an advanced water gas shift process and catalyst to readiness for testing at pilot plant scale through catalyst development and testing, and development of a preliminary design basis for a pilot scale reactor demonstrating the catalyst. A techno-economic analysis was performed by Nexant to assess the potential benefits of the gasifier and catalyst technologies in the context of power production and methanol production. This analysis showed an 18%reduction in cost of power and a 19%reduction in cost of methanol relative to DOE reference baseline cases.

  20. Effect of primary air content on formation of nitrogen oxides during combustion of Ehkibastuz coal

    Energy Technology Data Exchange (ETDEWEB)

    Kotler, V.R.; Imankulov, Eh.R.

    1986-01-01

    Investigations are discussed carried out in a pilot plant at the Kaz. Power Engineering Scientific Research Institute into the effect of the amount of primary air in coal-dust flame on the final concentration of nitrogen oxides in flue gases. The tests were carried out in a 7500 mm high, 1600 mm dia vertical cylindrical combustion chamber having type P-57 burner, and air dispersed fuel plus additional air supplies located at the top. Amounts of coal dust fed by a drum feeder along the air pipe varied from 100-600 kg/h. The required air was supplied by 5000 m/sup 3//h Type TK-700/5 blowers at 0.04 MPa. Ehkibastuz coal samples contained: 1.3% moisture; 48.1% ash; 38.02% carbon; 2.56% hydrogen; 0.73% sulfur; 0.60% nitrogen; heat of combustion was 14.3 MJ/kg. Results obtained indicate that variations in the amount of primary air in swirl flow burners affect formation of fuel nitrogen; there is an optimum volume at which minimum quantities of nitrogen oxides are formed. Either an increase or decrease in the primary air results in a rise in nitrogen oxide concentration. 3 references.

  1. Monitoring the sulfur content of coal streams by thermal-neutron-capture gamma-ray analysis

    International Nuclear Information System (INIS)

    Martin, J.W.; Hall, A.W.

    1976-07-01

    A theory was developed for evaluating a complex, prompt gamma ray spectrum to serve as the basis for an instrument to monitor continuously the sulfur content of tonnage streams of coal. Equations for the energies and intensities of prompt gamma rays emitted from 13 most significant elements in coal are combined into a single equation that defines the basic electronic design of the meter. The sulfur content of up to 10 tons per hour of coal was determined in pilot plant tests with a prototype meter. The precision of 0.04 percent sulfur substantiates the validity of the theory. In subsequent industrial plant tests the precision was determined to be a comparable 0.05 percent sulfur

  2. Exergy evaluation of a typical 330 MW solar-hybrid coal-fired power plant in China

    International Nuclear Information System (INIS)

    Peng, Shuo; Wang, Zhaoguo; Hong, Hui; Xu, Da; Jin, Hongguang

    2014-01-01

    Highlights: • Exergy analysis of solar-hybrid coal-fired power plant has been processed. • EUD method is utilized to obtain detailed information on the exergy destruction in each process. • Off-design thermodynamic performances are discussed to identify the advantages. • Exergy destruction of several parts under varying solar radiation is examined. - Abstract: This study discusses the thermodynamic performance of a solar-hybrid coal-fired power plant that uses solar heat with temperature lower than 300 °C to replace the extracted steam from a steam turbine to heat the feed water. Through this process, the steam that was to be extracted can efficiently expand in the steam turbine to generate electricity. The flow rate of steam returning to the turbine retains only a small part of the main stream, allowing the steam turbine to run close to design conditions for all DNI. A solar-only thermal power plant without storage is also discussed to illustrate the advantages of a solar-hybrid coal-fired power plant. The off-design performances of both plants are compared based on the energy-utilization diagram method. The exergy destruction of the solar-hybrid coal-fired power plant is found to be lower than that of the solar-only thermal power plant. The comparison of two plants, which may provide detailed information on internal phenomena, highlights several advantages of the solar-hybrid coal-fired power plant in terms of off-design operation: lower exergy destruction in the solar feed water heater and steam turbine and higher exergy and solar-to-electricity efficiency. Preliminary technological economic performances of both plants are compared. The results obtained in this study indicate that a solar-hybrid coal-fired power plant could achieve better off-design performance and economic performance than a solar-only thermal power plant

  3. FY 1996 report on the results of the development of an entrained bed coal gasification power plant. Part 2. Investigational study of verification plant; 1995 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 2. Jissho plant ni kansuru chosa kenkyu hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    For the purpose of developing the technology of the integrated coal gasification combined cycle power generation, an investigational study of verification plant was made, and the FY 1996 results were summarized. In this fiscal year, the conceptual design was made of the Nakoso method based on the method of Nakoso pilot plant, the fixed bed method in which fixed bed gas refining facilities tested in Nakoso pilot plant were adopted, and the packed bed method. In the Nakoso method, 5 cases were studied using the air blown two-stage entrained bed for gasifier, dry two-stage fluidized bed for desulfurization and dry granular bed packed bed for dust removal. In the fixed bed method, 2 cases were studied using the air blown two-stage entrained bed for gasifier and dry fixed bed for gas refining. In the packed bed method, 2 cases were studied using the air blown two-stage entrained bed for gasifier and dry packed bed for gas refining. As to gas turbine facilities, 5 cases were studied in which GT output is 115MW - 215MW (output of combined cycle power generation: 220MW - 420MW). (NEDO)

  4. Refining and end use study of coal liquids

    International Nuclear Information System (INIS)

    1998-01-01

    Two direct coal liquids were evaluated by linear programming analysis to determine their value as petroleum refinery feedstock. The first liquid, DL1, was produced from bitiuminous coal using the Hydrocarbon Technologies, Inc.(HTI) two-stage hydrogenation process in Proof of Concept Run No.1, POC-1. The second liquid, DL2,was produced from sub-bituminous coal using a three-stage HTI process in Proof of Concept Run No. 2, POC-2; the third stage being a severe hydrogenation process. A linear programming (LP) model was developed which simulates a generic 150,000 barrel per day refinery in the Midwest U.S. Data from upgrading tests conducted on the coal liquids and related petroleum fractions in the pilot plant testing phase of the Refining and End Use Study was inputed into the model. The coal liquids were compared against a generic petroleum crude feedstock. under two scenarios. In the first scenario, it was assumed that the refinery capacity and product slate/volumes were fixed. The coal liquids would be used to replace a portion of the generic crude. The LP results showed that the DL1 material had essentially the same value as the generic crude. Due to its higher quality, the DL2 material had a value of approximately 0.60 $/barrel higher than the petroleum crude. In the second scenario, it was assumed that a market opportunity exists to increase production by one-third. This requires a refinery expansion. The feedstock for this scenario could be either 100% petroleum crude or a combination of petroleum crude and the direct coal liquids. Linear programming analysis showed that the capital cost of the refinery expansion was significantly less when coal liquids are utilized. In addition, the pilot plant testing showed that both of the direct coal liquids demonstrated superior catalytic cracking and naphtha reforming yields. Depending on the coal liquid flow rate, the value of the DL1 material was 2.5-4.0 $/barrel greater than the base petroleum crude, while the DL2

  5. Coal resources of the eastern regions of Russia for power plants of the Asian super ring

    Science.gov (United States)

    Sokolov, Aleksander; Takaishvili, Liudmila

    2018-01-01

    The eastern regions of Russia have a substantial potential for expansion of steaming coal production. The majority of coal deposits in the eastern regions are located close enough to the objects of the Asian super ring. The large coal reserves make it possible to consider it as a reliable fuel source for power plants for a long-term horizon. The coal reserves suitable for using at power plants of the Asian super ring are estimated in the paper by subject of the federation of the eastern regions for operating and new coal producers. The coal deposits of the eastern regions that are promising for the construction of power plants of the Asian super ring are presented. The paper describes both the coal deposits of the eastern regions that are considered in the projects for power plant construction and included in the program documents and the coal deposits that are not included in the program documents. The coal reserves of these deposits and the possible volumes of its production are estimated. The key qualitative coal characteristics of the deposits: heating value, and ash, sulfur, moisture content are presented. The mining-geological and hydrological conditions for deposit development are briefly characterized. The coals of the eastern regions are showed to contain valuable accompanying elements. It is noted that the creation of industrial clusters on the basis of the coal deposits is the most effective from the standpoints of the economy and ecology. The favorable and restraining factors in development of the described coal deposits are estimated.

  6. Operating experiences with heat-exchanging components of a semi-technical pilot plant for steam gasification of coal using heat from HTR

    International Nuclear Information System (INIS)

    Kirchhoff, R.; Heek, K.H. van

    1984-01-01

    within the framework of the PNP- Project, a semi-technical plant for the development of a process of coal gasification by means of nuclear heat was operated. Here gasification is for the first time implemented in a fluidized bed using heat of an electrically heated helium cycle at pressure up to 40 bar and temperatures normal for HTR. The plant serves for testing and developing various components as immersion heater, insulations, dosing devices, and for compiling sound data for further planning

  7. Performance evaluation of high-sulphur coal-fired USC plant integrated with SNOX and CO2 capture sections

    International Nuclear Information System (INIS)

    Cau, Giorgio; Tola, Vittorio; Bassano, Claudia

    2015-01-01

    In recent years coal-fired power plants have increased their role in the global energy scenario thanks to reliability, security of fuel supply and lower cost of fuel and electricity. In this framework global warming issues require a sustainable use of coal and great efforts for greenhouse gases reduction, addressing research and development projects towards more efficient solutions in terms of efficiency and environmental impact. With this aim in this paper a performance assessment of an Ultra Super Critical (USC) steam plant integrated with a CO 2 removal section was carried out. The study is based on simulation models specifically developed through Aspen-Plus and Gate-Cycle software platforms. Performance was assessed referring to typical USC commercial size plants (400–600 MW), fuelled by a mix of a low-sulphur coal and a Sardinian (Sulcis) high-sulphur coal. The USC plant, based on a reheated and regenerative Rankine cycle, is integrated with an SNOX section, with integrated DeNO x and DeSO x processes, and a low temperature CO 2 capture section. The SNOX technology shows several advantages in comparison to conventional de-nitrification and de-sulphuration systems. In particular it is capable to remove both nitrogen and sulphur oxides, requiring less energy absorption compared to traditional FGD systems, allowing a further preheating of the combustion air and without producing process waste. Besides the SNOX releases a commercial product as the sulphuric acid (H 2 SO 4 ) and operational costs are reduced when sulphur content in the coal increases. The CO 2 capture system was based on a chemical absorption process. A conventional system based on an amine (monoethanolamine, MEA) aqueous solution was considered. In order to match high pressure and purity CO 2 transportation requirements, the CO 2 removal section is also integrated with a conditioning and compression section. A performance assessment of the USC plant was carried out varying the high-sulphur coal

  8. Coal-water slurries containing petrochemicals to solve problems of air pollution by coal thermal power stations and boiler plants: An introductory review.

    Science.gov (United States)

    Dmitrienko, Margarita A; Strizhak, Pavel A

    2018-02-01

    This introductory study presents the analysis of the environmental, economic and energy performance indicators of burning high-potential coal water slurries containing petrochemicals (CWSP) instead of coal, fuel oil, and natural gas at typical thermal power stations (TPS) and a boiler plant. We focus on the most hazardous anthropogenic emissions of coal power industry: sulfur and nitrogen oxides. The research findings show that these emissions may be several times lower if coal and oil processing wastes are mixed with water as compared to the combustion of traditional pulverized coal, even of high grades. The study focuses on wastes, such as filter cakes, oil sludge, waste industrial oils, heavy coal-tar products, resins, etc., that are produced and stored in abundance. Their deep conversion is very rare due to low economic benefit. Effective ways are necessary to recover such industrial wastes. We present the cost assessment of the changes to the heat and power generation technologies that are required from typical power plants for switching from coal, fuel oil and natural gas to CWSPs based on coal and oil processing wastes. The corresponding technological changes pay off after a short time, ranging from several months to several years. The most promising components for CWSP production have been identified, which provide payback within a year. Among these are filter cakes (coal processing wastes), which are produced as a ready-made coal-water slurry fuel (a mixture of flocculants, water, and fine coal dust). These fuels have the least impact on the environment in terms of the emissions of sulfur and nitrogen oxides as well as fly ash. An important conclusion of the study is that using CWSPs based on filter cakes is worthwhile both as the main fuel for thermal power stations and boiler plants and as starting fuel. Copyright © 2017 Elsevier B.V. All rights reserved.

  9. Removal of Emerging Contaminants and Estrogenic Activity from Wastewater Treatment Plant Effluent with UV/Chlorine and UV/H2O2 Advanced Oxidation Treatment at Pilot Scale

    Directory of Open Access Journals (Sweden)

    Eduard Rott

    2018-05-01

    Full Text Available Effluent of a municipal wastewater treatment plant (WWTP was treated on-site with the UV/chlorine (UV/HOCl advanced oxidation process (AOP using a pilot plant equipped with a medium pressure UV lamp with an adjustable performance of up to 1 kW. Results obtained from parallel experiments with the same pilot plant, where the state of the art UV/H2O2 AOP was applied, were compared regarding the removal of emerging contaminants (EC and the formation of adsorbable organohalogens (AOX. Furthermore, the total estrogenic activity was measured in samples treated with the UV/chlorine AOP. At an energy consumption of 0.4 kWh/m3 (0.4 kW, 1 m3/h and in a range of oxidant concentrations from 1 to 6 mg/L, the UV/chlorine AOP had a significantly higher EC removal yield than the UV/H2O2 AOP. With free available chlorine concentrations (FAC in the UV chamber influent of at least 5 mg/L (11 mg/L of dosed Cl2, the total estrogenic activity could be reduced by at least 97%. To achieve a certain concentration of FAC in the UV chamber influent, double to triple the amount of dosed Cl2 was needed, resulting in AOX concentrations of up to 520 µg/L.

  10. Removal of Emerging Contaminants and Estrogenic Activity from Wastewater Treatment Plant Effluent with UV/Chlorine and UV/H2O2 Advanced Oxidation Treatment at Pilot Scale

    Science.gov (United States)

    Kuch, Bertram; Lange, Claudia; Richter, Philipp; Kugele, Amélie; Minke, Ralf

    2018-01-01

    Effluent of a municipal wastewater treatment plant (WWTP) was treated on-site with the UV/chlorine (UV/HOCl) advanced oxidation process (AOP) using a pilot plant equipped with a medium pressure UV lamp with an adjustable performance of up to 1 kW. Results obtained from parallel experiments with the same pilot plant, where the state of the art UV/H2O2 AOP was applied, were compared regarding the removal of emerging contaminants (EC) and the formation of adsorbable organohalogens (AOX). Furthermore, the total estrogenic activity was measured in samples treated with the UV/chlorine AOP. At an energy consumption of 0.4 kWh/m3 (0.4 kW, 1 m3/h) and in a range of oxidant concentrations from 1 to 6 mg/L, the UV/chlorine AOP had a significantly higher EC removal yield than the UV/H2O2 AOP. With free available chlorine concentrations (FAC) in the UV chamber influent of at least 5 mg/L (11 mg/L of dosed Cl2), the total estrogenic activity could be reduced by at least 97%. To achieve a certain concentration of FAC in the UV chamber influent, double to triple the amount of dosed Cl2 was needed, resulting in AOX concentrations of up to 520 µg/L. PMID:29735959

  11. Efficiency improvement of thermal coal power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hourfar, D. [VEBA Kraftwerke Ruhr Ag, Gelsenkirchen (Germany)

    1996-12-31

    The discussion concerning an increase of the natural greenhouse effect by anthropogenic changes in the composition of the atmosphere has increased over the past years. The greenhouse effect has become an issue of worldwide debate. Carbon dioxide is the most serious emission of the greenhouse gases. Fossil-fired power plants have in the recent past been responsible for almost 30 % of the total CO{sub 2} emissions in Germany. Against this background the paper will describe the present development of CO{sub 2} emissions from power stations and present actual and future opportunities for CO{sub 2} reduction. The significance attached to hard coal as one of today`s prime sources of energy with the largest reserves worldwide, and, consequently, its importance for use in power generation, is certain to increase in the years to come. The further development of conventional power plant technology, therefore, is vital, and must be carried out on the basis of proven operational experience. The main incentive behind the development work completed so far has been, and continues to be, the achievement of cost reductions and environmental benefits in the generation of electricity by increasing plant efficiency, and this means that, in both the short and the long term, power plants with improved conventional technology will be used for environmentally acceptable coal-fired power generation.

  12. Geologic and well-construction data for the H-10 borehole complex near the proposed Waste Isolation Pilot Plant site, southeastern New Mexico

    International Nuclear Information System (INIS)

    Wells, J.G.; Drellack, S.L. Jr.

    1983-01-01

    The H-10 borehole complex, a group of three closely spaced boreholes, is located 4 miles southeast of the proposed Waste Isolation Pilot Plant site in west-central Lea County, New Mexico. The holes were drilled during August and October 1979 to obtain geologic and hydrologic data to better define the regional ground-water-flow system. The geologic data presented in this report are part of a site-characterization study for the possible storage of defense-associated radioactive wastes within salt beds of the Salado Formation of Permian age. The geologic data include detailed descriptions of cores, cuttings, and geophysical logs. Each borehole was designed to penetrate a distinct water-bearing zone: H-10a (total depth 1318 feet) was completed just below the Magenta Dolomite Member of the Rustler Formation of Permian age; H-10b (total depth 1398 feet) was completed just below the Culebra Dolomite Member of the Rustler Formation; and H-10c (total depth 1538 feet) was completed below the Rustler Formation-Salado Formation contact. The geologic units penetrated in borehole H-10c are surficial alluvium and eolian sand of Holocene age (0 to 5 feet); the Mescalero caliche (5 to 9 feet) and the Gatuna Formation (9 to 90 feet) of Pleistocene age: formations in the Dockum Group (Chinle Formation, 90 to 482 feet and Santa Rosa Sandstone, 482 to 658 feet) of Late Triassic age; and the Dewey Lake Red Beds (658 to 1204 feet), the Rustler Formation (1204 to 1501 feet), and part of the Salado Formation (1501 to 1538 feet), all of Permian age. The sections of the Rustler and Salado Formations penetrated by borehole H-10c are complete and contain little or no evidence of dissolution of halite and associated rocks, indicating that the eastward-moving dissolution within the Rustler or on top of the Salado, found west of the Waste Isolation Pilot Plant site, has not reached the H-10 site

  13. Achievement report on developing coal liquefaction technologies in fiscal 1999 - edition B. Development of bituminous coal liquefaction technology (studies by using pilot plant); 1999 nendo sekitan ekika gijutsu kaihatsu seika hokokusho B. Rekiseitan ekika gijutsu no kaihatsu (pilot plant ni yoru kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    With an objective to improve the environment by substituting petroleum energy by coal, and by reducing emission of SOx and NOx, research and development has been performed on coal liquefaction technologies. This paper summarizes the achievements thereof in fiscal 1999. In the disassembling study, wear, corrosion, and wall thickness change were investigated, and non-destructive inspection was performed on the major four facilities, and such newly developed devices as the liquefying catalyst manufacturing facilities, the slurry heat exchanger, and the let-down valves. The sampled test pieces were investigated of changes in the mechanical properties by means of the metallic structure inspection, hardness test, tensile test, and impact test. Deposits in the devices were investigated of their depositing conditions and constituents. The result reveals that the 3 Cr-1Mo-1/4V-Ti-B steel developed for the high-temperature, high-pressure, and hydrogen environment of the coal liquefaction plant showed excellent low-temperature tenacity and maintained good characteristics. No problems were discovered in corrosion resistance if PP using materials are used. The slurry handling centrifugal pump and instrumentation vales were worn out severely requiring replacements during the operation, for which further discussions are desired to be given. (NEDO)

  14. Waste Isolation Pilot Plant Overview

    Energy Technology Data Exchange (ETDEWEB)

    Weaver, Douglas James [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-03-27

    The mission of Waste Isolation Pilot Plant (WIPP) is to demonstrate the safe, environmentally sound, cost effective, permanent disposal of Transuranic (TRU) waste left from production of nuclear weapons.

  15. Environmental radioactivity and radiation exposure by radioactive emissions of coal-fired power plants

    International Nuclear Information System (INIS)

    Jacobi, W.

    1981-03-01

    On the basis of measurements of the radioactive emissions of a 300 MW coal-fired power plant and of a 600 MW lignite-fired power plant the expected activity increase in air and soil in the environment of both plants is estimated and compared with the normal, natural activity level. Due to these emissions it results for the point of maximum immission a committed effective dose equivalent per GW x a of about 0.2 mrem = 0.002 mSv for the coal-fired plant and of about 0.04 mrem = 0.0004 mSv for the lignite-fired plant. This dose is caused to nearly equal parts by inhalation, ingestion and external γ-radiation. The normalized effective dose equivalent in the environment of the modern coal-fired power plant is in the same order of magnitude like that of a modern pressurized water reactor. The total, collective effective dose equivalent commitment by the annual radioactive emissions of coal-fired power plants in the F.R.Germany is estimated to 2000-6000 Man x rem = 20-60 Man x Sv. This corresponds to a mean per caput-dose in the population of the F.R.Germany of about 0.03-0.1 mrem = 0.0003-0.001 mSv; this is about 0.02-0.06% of the mean normal natural radiation exposure of the population. (orig.) [de

  16. Quality control of repair of equipment for coal preparation plants. Upravlenie kachestvom remonta oborudovaniya ugleobogatitel'nykh fabrik

    Energy Technology Data Exchange (ETDEWEB)

    Okonishnikov, A I; Neskoromnykh, V M; Surzhenko, V S; Sirichenko, R P; Pavlyuchenko, S G; Lesikov, A V

    1984-01-01

    The Ukrniiugleobogashchenie, Kalininsk and Sukhodol'sk coal preparation plants have developed the SUKRO system for control of repair quality of coal preparation equipment in the USSR. The system is based on a system of standards used in coal preparation plants. The following systems of standards used by the SUKRO system are analyzed: organization standards (order of repair in a coal preparation plant, repair planning, spare part systems, methods for determining equipment wear, analysis of equipment failures), standards for maintenance and repair (methods for equipment maintenance, service life of each equipment component or system, structure of preventive repair or repair, organizational models of repair operations, lubrication systems), standards for assessment of labor quality during repair operations. Use of the SUKRO system in the Sukhodol'sk coal preparation plant is evaluated. The SUKRO forms a system of standards for repair and maintenance of equipment considering operation conditions in coal preparation plants, requirements for equipment reliability and service life. (4 refs.)

  17. Oil from coal: just not worth it, say NCB

    Energy Technology Data Exchange (ETDEWEB)

    Grainger, L

    1970-01-01

    The creation of new markets by making oil fuels from coal in Britain is unresolved at this time. The dominant factor in the economics is the price ratio between coal and oil, which in Britain is 3 times less favorable than in the U.S. Current conversion results in a price more than double that of natural oil; however, the National Coal Board (NCB) continues to assess oil-from-coal processes. A sound research background in the new field of coal derivatives from solvent processing is being developed to produce materials of higher specific value than fuels. A continuous pilot plant is being built to prepare coke from filtered coal solution on the scale of a half-a-ton per week. Future prospects of the industry lie in areas where markets for coal will diminish, such as metallurgical coke. The fate of the coal industry will depend more and more on its largest market-electricity generation. In order to compete with nuclear power, the NCB is developing a new system of fluidized combustion.

  18. Acidity of vapor plume from cooling tower mixed with flue gases emitted from coal-fired power plant.

    Science.gov (United States)

    Hlawiczka, Stanislaw; Korszun, Katarzyna; Fudala, Janina

    2016-06-01

    Acidity of products resulting from the reaction of flue gas components emitted from a coal-fired power plant with water contained in a vapor plume from a wet cooling tower was analyzed in a close vicinity of a power plant (710 m from the stack and 315 m from the cooling tower). Samples of this mixture were collected using a precipitation funnel where components of the mixed plumes were discharged from the atmosphere with the rainfall. To identify situations when the precipitation occurred at the same time as the wind directed the mixed vapor and flue gas plumes above the precipitation funnel, an ultrasound anemometer designed for 3D measurements of the wind field located near the funnel was used. Precipitation samples of extremely high acidity were identified - about 5% of samples collected during 12 months showed the acidity below pH=3 and the lowest recorded pH was 1.4. During the measurement period the value of pH characterizing the background acidity of the precipitation was about 6. The main outcome of this study was to demonstrate a very high, and so far completely underestimated, potential of occurrence of episodes of extremely acid depositions in the immediate vicinity of a coal-fired power plant. Copyright © 2016 Elsevier B.V. All rights reserved.

  19. Mechanism and kinetics of uranium adsorption onto soil around coal-fired power plant

    Science.gov (United States)

    Yasim, Nurzulaifa Shaheera Erne Mohd; Ariffin, Nik Azlin Nik; Mohammed, Noradila; Ayob, Syafina

    2017-11-01

    Coal is the largest source of energy in Malaysia providing approximately 80 % of all entire power needs. The combustion of coal concentrates a high content of heavy metals and radioactive elements in the ashes and sludge. Hazardous emissions from coal combustion were deposited into the soil and most likely transported into the groundwater system. The presence of radioactive materials in the ground water system can cause a wide range of environmental impacts and adverse health effects like cancer, impairment of neurological function and cardiovascular disease. However, the soil has a natural capability in adsorption of radioactive materials. Thus, this study was evaluated the adsorption capacity of Uranium onto the soil samples collected nearby the coal-fired power plants. In the batch experiment, parameters that were set constant include pH, the amount of soil and contact time. Various initial concentrations of radionuclides elements in the range of 2 mg/L - 10 mg/L were used. The equilibrium adsorption data was analyzed by the Freundlich isotherm and Langmuir isotherms. Then, the influences of solution pH, contact time and temperature on the adsorption process were investigated. The kinetics of radioactive materials was discussed by pseudo-first-order and pseudo-second-order rate equation. Thus, the data from this study could provide information about the potentiality of soil in sorption of radioactive materials that can be leached into groundwater. Besides that, this study could also be used as baseline data for future reference in the development of adsorption modeling in the calculation of distribution coefficient.

  20. Layout of an internally heated gas generator for the steam gasification of coal

    International Nuclear Information System (INIS)

    Feistel, P.P.; Duerrfeld, R.; Heck, K.H. van; Juentgen, H.

    1975-01-01

    Industrial-scale steam gasification of coal using heat from high temperature reactors requires research and development on allothermal gas generators. Bergbau-Forschung GmbH, Essen, does theoretical and experimental work in this field. The experiments deal with reaction kinetics, heat transfer and material tests. Their significance for the layout of a full-scale gas generator is shown. Including material specifications, the feasibility of a gasifier, characterized by a fluid bed volume of 318 m 3 and a heat transferring area of 4000 m 2 , results. The data, now available, are used to determine the gasification throughput from the heat balance, i.e. the equality of heat consumed and heat transferred. Throughputs of about 50 t/hr of coal are possible for a single gas generator, the helium outlet temperature of the HTR being 950 0 C/ Bergbau-Forschung has commissioned a medium-scale pilot plant (200 kg/hr). (Auth.)

  1. Understanding coal quality and its relationship to power plant performance and costs

    Energy Technology Data Exchange (ETDEWEB)

    Jennison, K.D.; Stallard, G.S. [Black & Veatch International, Overland Park, KS (United States)

    1995-12-01

    The availability of reliable, reasonably priced energy is a necessary cornerstone for established and emerging economies. In addition to addressing coal quality issues strictly at a plant level, it is now prudent to consider long-term performance and economics of particular fuel sources to be selected in the light of system economics and reliability. In order to evaluate coal quality issues in a more comprehensive manner, it is important to develop both an approach and a set of tools which can support the various phases of the planning/analysis processes. The processes must consider the following: (1) Cost/availability of other potential coal supplies, including {open_quotes}raw{close_quotes} domestic sources, {open_quotes}cleaned {close_quotes} domestic sources, and other internationally marketed coals. (2) Power plant performance issues as function of plant design and fuel properties. (3) System expansion plans, candidate technologies, and associated capital and operating costs. (4) Projected load demand, for system and for individual units within the system. (5) Legislative issues such as environmental pressures, power purchase agreements, etc. which could alter the solution. (6) Economics of potential plans/strategies based on overall cost-effectiveness of the utility system, not just individual units. (7) Anticipated unit configuration, including addition of environmental control equipment or other repowering options. The Coal Quality Impact Model (CQIM{trademark}) is a PC-based computer program capable of predicting coal-related cost and performance impacts at electric power generating sites. The CQIM was developed for EPRI by Black & Veatch and represents over a decade of effort geared toward developing an extensible state-of-the-art coal quality assessment tool. This paper will introduce CQIM, its capabilities, and its application to Eastern European coal quality assessment needs.

  2. Improving occupational conditions in coal preparation plants considering noise factor. [USSR

    Energy Technology Data Exchange (ETDEWEB)

    Zhurbinskii, L.F.; Shabel' nikova, E.V.; Sidorov, E.G.

    1985-11-01

    Three research institutes (IOTT, UkrNIIugleobogashchenie and KuzNIIugleobogashchenie) investigated health hazards associated with noise in coal preparation plants in the Donbass, Kuzbass and Karaganda basins. Investigations showed that there is a close correlation of noise pollution with rate of illness (heart diseases, nervous system diseases, alimentary duct diseases, respiratory diseases and diseases of the auditory organs). An equation which describes the correlation is derived. Correlation coefficient (ranging from 0.75 to 0.94) for each of 4 types of diseases was determined. Analyses showed that reducing noise level from 95 to 85 dB caused a decrease in rate of illness ranging from 2.5 to 3.0 times. Absenteeism due to illness decreased 1.5 to 2.0 times. Investigations also showed that accident rate is influenced by noise level. About 30% of accidents fell on working places with increased noise level. About 10% of accidents fell on working places with noise level of about 85 dB and from 3 to 4% accidents on working places with noise level of about 70 dB. Methods for noise pollution control in coal preparation plants in the USSR are evaluated. Effects of coal transport and handling on noise pollution in coal preparation plants are analyzed.

  3. FY 1980 Report on results of Sunshine Project. Development of coal liquefaction techniques (Development of materials for the coal liquefaction plant); 1980 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho. Sekitan ekika plant zairyo no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    A 1 T/D solvent-extraction type coal liquefaction test plant was constructed and operated to obtain the technical data for the design of, and establish the techniques for, an efficient coal liquefaction plant. The FY 1980 program includes surveys on the materials for coal liquefaction plants, covering those already developed and under development, to clarify the problematical points; drafting the test schedules; and conceptual designs of the material testing facilities. The major problems involved in the materials for coal liquefaction plants include erosion by fluidizing coal slurry, hydrogen embrittlement of the reactor materials, and corrosion by the liquefaction products (e.g., stress-corrosion cracking of austenitic steel, and corrosion by organic acids). The surveys on materials research trends suggest that USA seems to concentrate their research efforts on the reactor materials. The corrosion tests are mostly of in-plant tests, but the stress corrosion and slurry erosion tests are conducted on a laboratory scale. The conceptual designs are drawn for some testing units, e.g., the loop type material testing unit and basic testing unit for jet-spray type slurry erosion. (NEDO)

  4. In situ solidification/stabilization pilot study for the treatment of coal tar contaminated soils and river sediments

    International Nuclear Information System (INIS)

    Lawson, M.A.; Venn, J.G.; Pugh, L.B.; Vallis, T.

    1996-01-01

    Coal tar contamination was encountered at a former coal gasification site in soils below the groundwater table, and in the sediments of the adjacent river. Ex situ remediation techniques at this site would be costly because of the need to dewater the impacted media. In situ solidification/stabilization was tested to evaluate its effectiveness. Treatability testing was performed to evaluate a Portland cement/fly ash binder system with added stabilizing agents. Results were sufficiently promising to warrant pilot testing. Grout containing Portland cement, fly ash, organically modified clay, and granular activated carbon was pilot tested at the site. Test specimens were collected and tested to evaluate durability, compressive strength, and permeability. The samples were extracted by several methods and analyzed to measure the leachable concentrations of organic compounds and metals. Results indicated acceptable physical characteristics. Leachable concentrations of most polynuclear aromatic compounds were decreased

  5. FY 1990 report on the results of the development of the entrained bed coal gasification power plant. Part 1. Element study; 1990 nendo seika hokokusho. Funryusho sekitan gaska hatsuden plant kaihatsu - Sono 1. Yoso kenkyu hen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    For the purpose of establishing the technology of the integrated coal gasification combined cycle power generation, element study was made for a pilot plant of 200t/d entrained bed coal gasification power generation, and the FY 1990 results were summarized. In the study by the gasification test on 2t/d furnace, gasification test was conducted for the OM coal newly selected as a coal proposed for the expansion of coal kind. As a result, the pulverized coal/char of OM coal have almost good handling property and showed favorable gasification performance. In the study of large gas turbine combustor for demonstrative machine, with the aim of developing a combustor that makes stable combustion also in the low load region possible, fabrication of the accessory equipment of combustor (choke mechanism, measuring use duct and heat insulating plate) was made for the actual-pressure/actual-size combustion test. In the study by simulation of the total system of combined cycle power generation, etc., the following were conducted: verification of characteristics of the integrated control (state of the ordinary operation, state of the mock load control, etc.), load dump simulation (state of the bleed cooperation, state of the bleed separation (state of the air booster operation, etc.)), etc. (NEDO)

  6. LOCAL IMPACTS OF MERCURY EMISSIONS FROM COAL FIRED POWER PLANTS.

    Energy Technology Data Exchange (ETDEWEB)

    SULLIVAN, T.M.; BOWERMAN, B.; ADAMS, J.; LIPFERT, D.D.; MORRIS, S.M.; BANDO, A.; ET AL.

    2004-03-30

    A thorough quantitative understanding of the processes of mercury emissions, deposition, and translocation through the food chain is currently not available. Complex atmospheric chemistry and dispersion models are required to predict concentration and deposition contributions, and aquatic process models are required to predict effects on fish. There are uncertainties in all of these predictions. Therefore, the most reliable method of understanding impacts of coal-fired power plants on Hg deposition is from empirical data. A review of the literature on mercury deposition around sources including coal-fired power plants found studies covering local mercury concentrations in soil, vegetation, and animals (fish and cows (Lopez et al. 2003)). There is strong evidence of enhanced local deposition within 3 km of the chlor-alkali plants, with elevated soil concentrations and estimated deposition rates of 10 times background. For coal-fired power plants, the data show that atmospheric deposition of Hg may be slightly enhanced. On the scale of a few km, modeling suggests that wet deposition may be increased by a factor of two or three over background. The measured data suggest lower increases of 15% or less. The effects of coal-fired plants seem to be less than 10% of total deposition on a national scale, based on emissions and global modeling. The following summarizes our findings from published reports on the impacts of local deposition. In terms of excesses over background the following increments have been observed within a few km of the plant: (1) local soil concentration Hg increments of 30%-60%, (2) sediment increments of 18-30%, (3) wet deposition increments of 11-12%, and (4) fish Hg increments of about 5-6%, based on an empirical finding that fish concentrations are proportional to the square root of deposition. Important uncertainties include possible reductions of RGM to Hg(0) in power plant plumes and the role of water chemistry in the relationship between Hg

  7. Advanced design nuclear power plants: Competitive, economical electricity. An analysis of the cost of electricity from coal, gas and nuclear power plants

    International Nuclear Information System (INIS)

    1992-06-01

    This report presents an updated analysis of the projected cost of electricity from new baseload power plants beginning operation around the year 2000. Included in the study are: (1) advanced-design, standardized nuclear power plants; (2) low emissions coal-fired power plants; (3) gasified coal-fired power plants; and (4) natural gas-fired power plants. This analysis shows that electricity from advanced-design, standardized nuclear power plants will be economically competitive with all other baseload electric generating system alternatives. This does not mean that any one source of electric power is always preferable to another. Rather, what this analysis indicates is that, as utilities and others begin planning for future baseload power plants, advanced-design nuclear plants should be considered an economically viable option to be included in their detailed studies of alternatives. Even with aggressive and successful conservation, efficiency and demand-side management programs, some new baseload electric supply will be needed during the 1990s and into the future. The baseload generating plants required in the 1990s are currently being designed and constructed. For those required shortly after 2000, the planning and alternatives assessment process must start now. It takes up to ten years to plan, design, license and construct a new coal-fired or nuclear fueled baseload electric generating plant and about six years for a natural gas-fired plant. This study indicates that for 600-megawatt blocks of capacity, advanced-design nuclear plants could supply electricity at an average of 4.5 cents per kilowatt-hour versus 4.8 cents per kilowatt-hour for an advanced pulverized-coal plant, 5.0 cents per kilowatt-hour for a gasified-coal combined cycle plant, and 4.3 cents per kilowatt-hour for a gas-fired combined cycle combustion turbine plant

  8. Radiation doses from coal-fired plants in Oxfordshire and Berkshire

    International Nuclear Information System (INIS)

    Wan, S.L.; Wrixon, A.D.

    1988-12-01

    This report contains an assessment of the radiation doses to members of the public living in Oxfordshire and Berkshire from the releases to atmosphere of natural radioactivity from Didcot Power Station and the coal-fired boilers that operate at the Atomic Weapons Establishment (AWE) at Aldermaston and the Harwell Laboratory of UKAEA. The calculated annual effective dose equivalents to adults from the emissions from Didcot Power Station and the coal-fired plants at AWE, Aldermaston, and UKAEA, Harwell, at 5 km from the sites are, respectively, 0.3, 0.06 and 0.01 μSv. The dose to red bone marrow are broadly comparable with these values. The doses to the other age groups considered (1-year-old and 10-year-old children) are similar to those to the adults. The conclusion is therefore drawn that the discharges from the coal-fired plants make a negligible contribution to the total radiation doses received by the population living around the sites. (author)

  9. Plant species from coal mine overburden dumping site in Satui, South Kalimantan, Indonesia

    Directory of Open Access Journals (Sweden)

    Vivi Novianti

    2017-07-01

    Full Text Available Coal mine overburden (OB materials were nutrient-poor, loosely adhered particles of shale, stones, boulders, and cobbles, also contained elevated concentration of trace metals. This condition cause OB substrate did not support plants growth. However, there were certain species that able to grow on overburden dumping site. This investigation sought to identify plants species that presence on coal mine overburden. The research was conducted on opencast coal mine OB dumping site in Satui, South Kalimantan. Vegetation sampling was carried out on six different ages of coal mine OB dumps (7, 10, 11, 42, 59 and 64 month using line transect. Species identification used information from local people, AMDAL report of PT Arutmin Indonesia-Satui mine project, and website. There were 123 plant species, consisted of 79 herbs (Cyperaceae, Poaceae and Asteraceae, 10 lianes, bryophyte, 9 ferns, 10 shrubs, and 14 trees. A number of Poaceae, i.e., Paspalumconjugatum, Paspalumdilatatum, and Echinochloacolona generally present among the stones, boulders, and cobbles. While Cyperaceae such as Fimbristylis miliaceae, Cyperus javanicus, Rhyncospora corymbosa and Scleria sumatrensis most often foundinand around thebasin/pond with its smooth and humid substrate characteristics. Certain species of shrubs and trees present on the 7 month OB dumping site. They wereChromolaena odorata, Clibadium surinamense, Melastoma malabathricum, Trema micrantha, and Solanum torvum (Shrubs, Ochroma pyramidale and Homalanthus populifolius (trees. This plant species could be used for accelerating primary succession purpose on coal mine overburden dumping site. Nevertheless, species selection was needed to avoid planting invasive species.

  10. The influence of PM2.5 coal power plant emissions on environment PM2.5 in Jilin Province, China

    Science.gov (United States)

    Sun, Ye; Li, Zhi; Zhang, Dan; Zhang, He; Zhang, Huafei

    2018-02-01

    In recent years, in the Northeast of China, the heating period comes with large range of haze weather. All the units of coal power plants in Jilin Province have completed the cogeneration reformation; they provide local city heat energy. Many people believe that coal power plants heating caused the heavy haze. In is paper, by compared concentration of PM2.5 in environment in heating period and non heating period, meanwhile the capacity of local coal power plants, conclude that the PM2.5 emission of coal power plants not directly cause the heavy haze in Changchun and Jilin in the end of October and early November. In addition, the water-soluble iron composition of PM2.5 coal power plant emissions is compared with environment, which further proves that the heating supply in coal power plants is not the cause of high concentration of PM2.5 in Jilin province.

  11. Comprehensive evaluation of coal-fired power plants based on grey relational analysis and analytic hierarchy process

    International Nuclear Information System (INIS)

    Xu Gang; Yang Yongping; Lu Shiyuan; Li Le; Song Xiaona

    2011-01-01

    In China, coal-fired power plants are the main supplier of electricity, as well as the largest consumer of coal and water resources and the biggest emitter of SO x , NO x , and greenhouse gases (GHGs). Therefore, it is important to establish a scientific, reasonable, and feasible comprehensive evaluation system for coal-fired power plants to guide them in achieving multi-optimisation of their thermal, environmental, and economic performance. This paper proposes a novel comprehensive evaluation method, which is based on a combination of the grey relational analysis (GRA) and the analytic hierarchy process (AHP), to assess the multi-objective performance of power plants. Unlike the traditional evaluation method that uses coal consumption as a basic indicator, the proposed evaluation method also takes water consumption and pollutant emissions as indicators. On the basis of the proposed evaluation method, a case study on typical 600 MW coal-fired power plants is carried out to determine the relevancy rules among factors including the coal consumption, water consumption, pollutant, and GHG emissions of power plants. This research offers new ideas and methods for the comprehensive performance evaluation of complex energy utilisation systems, and is beneficial to the synthesised consideration of resources, economy, and environment factors in system optimising and policy making. - Research highlights: → We proposed a comprehensive evaluation method for coal-fired power plants. → The method is based on the grey relational analysis (GRA). → The method also introduces the idea of the analytic hierarchy process (AHP). → The method can assess thermal, economic and environmental performance. → The method can play an active role in guiding power plants' improvements.

  12. Comprehensive evaluation of coal-fired power plants based on grey relational analysis and analytic hierarchy process

    Energy Technology Data Exchange (ETDEWEB)

    Xu Gang, E-mail: xg2008@ncepu.edu.c [Key Lab of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education, School of Energy Power and Mechanical Engineering, North China Electric Power University, Beijing 102206 (China); Yang Yongping, E-mail: yyp@ncepu.edu.c [Key Lab of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education, School of Energy Power and Mechanical Engineering, North China Electric Power University, Beijing 102206 (China); Lu Shiyuan; Li Le [Key Lab of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education, School of Energy Power and Mechanical Engineering, North China Electric Power University, Beijing 102206 (China); Song Xiaona [Electromechanical Practice Center, Beijing Information Science and Technology University, Beijing (China)

    2011-05-15

    In China, coal-fired power plants are the main supplier of electricity, as well as the largest consumer of coal and water resources and the biggest emitter of SO{sub x}, NO{sub x}, and greenhouse gases (GHGs). Therefore, it is important to establish a scientific, reasonable, and feasible comprehensive evaluation system for coal-fired power plants to guide them in achieving multi-optimisation of their thermal, environmental, and economic performance. This paper proposes a novel comprehensive evaluation method, which is based on a combination of the grey relational analysis (GRA) and the analytic hierarchy process (AHP), to assess the multi-objective performance of power plants. Unlike the traditional evaluation method that uses coal consumption as a basic indicator, the proposed evaluation method also takes water consumption and pollutant emissions as indicators. On the basis of the proposed evaluation method, a case study on typical 600 MW coal-fired power plants is carried out to determine the relevancy rules among factors including the coal consumption, water consumption, pollutant, and GHG emissions of power plants. This research offers new ideas and methods for the comprehensive performance evaluation of complex energy utilisation systems, and is beneficial to the synthesised consideration of resources, economy, and environment factors in system optimising and policy making. - Research highlights: {yields} We proposed a comprehensive evaluation method for coal-fired power plants. {yields} The method is based on the grey relational analysis (GRA). {yields} The method also introduces the idea of the analytic hierarchy process (AHP). {yields} The method can assess thermal, economic and environmental performance. {yields} The method can play an active role in guiding power plants' improvements.

  13. Gas core reactors for coal gasification

    International Nuclear Information System (INIS)

    Weinstein, H.

    1976-01-01

    The concept of using a gas core reactor to produce hydrogen directly from coal and water is presented. It is shown that the chemical equilibrium of the process is strongly in favor of the production of H 2 and CO in the reactor cavity, indicating a 98 percent conversion of water and coal at only 1500 0 K. At lower temperatures in the moderator-reflector cooling channels the equilibrium strongly favors the conversion of CO and additional H 2 O to CO 2 and H 2 . Furthermore, it is shown the H 2 obtained per pound of carbon has 23 percent greater heating value than the carbon so that some nuclear energy is also fixed. Finally, a gas core reactor plant floating in the ocean is conceptualized which produces H 2 , fresh water and sea salts from coal

  14. Test installation for studying erosion-corrosion of metals for coal washing plants

    Energy Technology Data Exchange (ETDEWEB)

    Hoey, G. R.; Dingley, W.; Wiles, C. T.

    1979-02-15

    A test installation was constructed for investigating erosion-corrosion of metals by coal-water slurries. Erosion-corrosion tests of mild steel panels were conducted using slurries of alundum, quartz, washed coal and coal refuse. Wear rates were found to depend on type of abrasive, particle size and water conductivity and were reduced by cathodic protection and inhibitors. Cathodic protection of mild steel in coal slurries containing sulphate ion reduced wear by 90% and 86% for stationary and rotating panels, respectively. This study has demonstrated that the successful application of corrosion control techniques would reduce metal wastage in coal washing plants. The test installation is considered suitable for developing the techniques.

  15. Dust collection capacity of plants growing in coal mining areas

    International Nuclear Information System (INIS)

    Maiti, S.K.

    1993-01-01

    Plant can act as living filter of dust pollution in coal mining areas, where the amount of suspended particulate matter and dust fall rate is very high. Therefore, plant species growing in coal mining areas are classified as evergreen or deciduous with simple and compound leaf basis. The dust arresting capacity of each leaf is measured and expressed in g/m 2 . The study indicated that evergreen plants with simple, pilose surface, like - Alstonia, Ficus cunea, F. benghalensis and Mangifera indica are good dust catcher than evergreen compound leaves of Cassia siamea, Acacia arabica and Leucaena leucocephala. Deciduous with simple leaves, such as Zizyphus mauritiana, F. religiosa, Psidium guyava are also good dust collectors. Suitable plant species also help in quick reclamation of mined out areas; one practical difficulty for establishment of trees as green belts or reclamation purpose, has been incidence of cattle grazing. This study suggested a systematic way of selecting plant species on the basis of their efficiency in dust control and resistance to cattle grazing. (author). 16 refs., 3 tabs

  16. Coal mining activities change plant community structure due to air pollution and soil degradation.

    Science.gov (United States)

    Pandey, Bhanu; Agrawal, Madhoolika; Singh, Siddharth

    2014-10-01

    The aim of this study was to investigate the effects of coal mining activities on the community structures of woody and herbaceous plants. The response of individual plants of community to defilement caused by coal mining was also assessed. Air monitoring, soil physico-chemical and phytosociological analyses were carried around Jharia coalfield (JCF) and Raniganj coalfield. The importance value index of sensitive species minified and those of tolerant species enhanced with increasing pollution load and altered soil quality around coal mining areas. Although the species richness of woody and herbaceous plants decreased with higher pollution load, a large number of species acclimatized to the stress caused by the coal mining activities. Woody plant community at JCF was more affected by coal mining than herbaceous community. Canonical correspondence analysis revealed that structure of herbaceous community was mainly driven by soil total organic carbon, soil nitrogen, whereas woody layer community was influenced by sulphur dioxide in ambient air, soil sulphate and soil phosphorus. The changes in species diversity observed at mining areas indicated an increase in the proportion of resistant herbs and grasses showing a tendency towards a definite selection strategy of ecosystem in response to air pollution and altered soil characteristics.

  17. Techno-Economic Analysis of Integration of Low-Temperature Geothermal Resources for Coal-Fired Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Bearden, Mark D.; Davidson, Casie L.; Horner, Jacob A.; Heldebrant, David J.; Freeman, Charles J.

    2016-05-11

    Presented here are the results of a techno-economic (TEA) study of the potential for coupling low-grade geothermal resources to boost the electrical output from coal-fired power plants. This study includes identification of candidate 500 MW subcritical coal-fired power plants in the continental United States, followed by down-selection and characterization of the North Valmy generating station, a Nevada coal-fired plant. Based on site and plant characteristics, ASPEN Plus models were designed to evaluate options to integrate geothermal resources directly into existing processes at North Valmy. Energy outputs and capital costing are presented for numerous hybrid strategies, including integration with Organic Rankine Cycles (ORCs), which currently represent the primary technology for baseload geothermal power generation.

  18. WIPP: Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1984-01-01

    The following aspects of the Waste Isolation Pilot Plant are discussed briefly: history and site selection; salt as a disposal medium; transporting waste materials; early key events; impacts on New Mexico; project organization; and site certification profile

  19. Committed CO2 Emissions of China's Coal-fired Power Plants

    Science.gov (United States)

    Suqin, J.

    2016-12-01

    The extent of global warming is determined by the cumulative effects of CO2 in the atmosphere. Coal-fired power plants, the largest anthropogenic source of CO2 emissions, produce large amount of CO2 emissions during their lifetimes of operation (committed emissions), which thus influence the future carbon emission space under specific targets on mitigating climate change (e.g., the 2 degree warming limit relative to pre-industrial levels). Comprehensive understanding of committed CO2 emissions for coal-fired power generators is urgently needed in mitigating global climate change, especially in China, the largest global CO2emitter. We calculated China's committed CO2 emissions from coal-fired power generators installed during 1993-2013 and evaluated their impact on future emission spaces at the provincial level, by using local specific data on the newly installed capacities. The committed CO2 emissions are calculated as the product of the annual coal consumption from newly installed capacities, emission factors (CO2emissions per unit crude coal consumption) and expected lifetimes. The sensitivities about generators lifetimes and the drivers on provincial committed emissions are also analyzed. Our results show that these relatively recently installed coal-fired power generators will lead to 106 Gt of CO2 emissions over the course of their lifetimes, which is more than three times the global CO2 emissions from fossil fuels in 2010. More than 80% (85 Gt) of their total committed CO2 will be emitted after 2013, which are referred to as the remaining emissions. Due to the uncertainties of generators lifetime, these remaining emissions would increase by 45 Gt if the lifetimes of China's coal-fired power generators were prolonged by 15 years. Furthermore, the remaining emissions are very different among various provinces owing to local developments and policy disparities. Provinces with large amounts of secondary industry and abundant coal reserves have higher committed

  20. Reconstruction of the aero-mixture channels of the pulverized coal plant of the 100MW power plant unit

    Directory of Open Access Journals (Sweden)

    Ivanovic Vladan B.

    2011-01-01

    Full Text Available After the last revitalization of thermal power block of 100 MW in TPP “Kostolac A”, made in the year 2004, during the operation of the plant, pulverized coal deposition often occurred in horizontal sections of the aero-mixture channels. Deposition phenomenon manifested itself in places ahead of spherical compensators in the direction of flow of pulverized coal to the burners, due to unfavorable configuration of these channels. Coal dust deposited in the channels dried and spontaneously combusted, causing numerous damage to channels and its isolation as well as the frequent stoppage of the operation for necessary interventions. The paper presents the original solution of reconstruction of aero-mixture channels which prevented deposition of coal dust and its eventual ignition. In this way the reliability of the mill plant is maximized and higher availability of boiler and block as a whole is achieved.

  1. Coal - 96

    International Nuclear Information System (INIS)

    Sparre, C.

    1996-09-01

    The report deals mainly with coal consumption, but also gives some information about technology, environmental aspects and markets. Data have been collected by questionnaires or via telephone. The use of steam coal for heating was 0.8 Mtons (down 20% from 1994). Cogeneration plants were the main users. Taxes and environmental reasons cause a reduction of the coal use that will probably continue the next years. Use of steam coal in industry has been constant at a level of 0.7 Mtons. The import of metallurgical coal rests constant at a level of 1.6 Mtons. 1.2 Mtons of coke was produced, and 0.3 Mtons imported. The PFBC-plant at Vaertan, Stockholm used 0.13 Mtons of coal, while some coal fired power plants have been converted to peat and wood fuels. The average price of steam coal imported to Sweden in 1995 was 333 SEK/ton, 6% higher than in 1994. The contract prices for delivery 1996 are about the same as at the end of 1995. All cogeneration plants have some sort of SO 2 removal system, mostly wet-dry. The largest plant, at Vaesteraas, has recently invested in a SCR system for NO x removal. Most other plants are using low NO x burners or SNCR systems, based on ammonia or urea, which reduce the emissions 50 - 70%. Some statistic about the world coal market is also given in the report

  2. Hydrogen Fuel as Ecological Contribution to Operation of the Existing Coal-Fired Thermal Power Plants

    International Nuclear Information System (INIS)

    Cosic, D.

    2009-01-01

    The analysis is carried out of the application of a new hydrogen based alternative fuel as ecological contribution of the coal thermal power plants operation. Given the fact that coal thermal power plants are seen as the largest producers, not only of CO 2 , but of all others harmful gases, the idea is initiated to use the new alternative fuel as an additive to the coal which would result in much better performance of the coal power plants from an ecological point of view. It is possible to use such a fuel in relation of 10-30% of former coal use. The positive influence of such an application is much bigger than relative used quantity. This lecture has a goal to incite potential investors to create conditions for industrial testing of the new fuel. It will be very interesting to animate investors for large-scale production of the new fuel, too.(author).

  3. Basic Data Report for Drillholes on the H-19 Hydropad (Waste Isolation Pilot Plant--WIPP)

    International Nuclear Information System (INIS)

    Mercer, J.W.; Cole, D.L.; Holt, R.M.

    1998-01-01

    Seven holes were drilled and wells (H-19b0, H-19b2, H-19b3, H-19b4, H-19b5, H-19b6, and H-19b7) were constructed on the H-19 hydropad to conduct field activities in support of the Culebra Transport Program. These wells were drilled and completed on the Waste Isolation Pilot Plant (WIPP) site during February to September 1995. An eighth hole, H-19b1, was drilled but had to be abandoned before the target depth was reached because of adverse hole conditions. The geologic units penetrated at the H-19 location include surficial deposits of Holocene age, rocks from the Dockum Group of Upper Triassic age, the Dewey Lake Redbeds, and Rustler Formation of the Permian age. The Rustler Formation has been further divided into five informal members which include the Forty-niner Member, Magenta Member, Tamarisk Member, Culebra Dolomite Member, and an unnamed lower member. The Rustler Formation, particularly the Culebra Dolomite Member, is considered critical for hydrologic site characterization. The Culebra is the most transmissive saturated unit above the WIPP repository and, as such, is considered to be the most likely pathway for radionuclide transport to the accessible environment in the unlikely event the repository is breached. Seven cores from the Culebra were recovered during drilling activities at the H-19 hydropad and detailed descriptions of these cores were made. On the basis of geologic descriptions, four hydrostratigraphic units were identified in the Culebra cores and were correlated with the mapping units from the WFP air intake shaft. The entire length of H-19b1 was cored and was described in detail. During coring of H-19b1, moisture was encountered in the upper part of the Dewey Lake Redbeds. A 41-ft-thick section of this core was selected for detailed description to qualify the geologic conditions related to perched water in the upper Dewey Lake. In addition to cuttings and core, a suite of geophysical logs run on the drillholes was used to identify and

  4. Basic Data Report for Drillholes on the H-19 Hydropad (Waste Isolation Pilot Plant--WIPP)

    Energy Technology Data Exchange (ETDEWEB)

    Mercer, J.W.; Cole, D.L.; Holt, R.M.

    1998-10-09

    Seven holes were drilled and wells (H-19b0, H-19b2, H-19b3, H-19b4, H-19b5, H-19b6, and H-19b7) were constructed on the H-19 hydropad to conduct field activities in support of the Culebra Transport Program. These wells were drilled and completed on the Waste Isolation Pilot Plant (WIPP) site during February to September 1995. An eighth hole, H-19b1, was drilled but had to be abandoned before the target depth was reached because of adverse hole conditions. The geologic units penetrated at the H-19 location include surficial deposits of Holocene age, rocks from the Dockum Group of Upper Triassic age, the Dewey Lake Redbeds, and Rustler Formation of the Permian age. The Rustler Formation has been further divided into five informal members which include the Forty-niner Member, Magenta Member, Tamarisk Member, Culebra Dolomite Member, and an unnamed lower member. The Rustler Formation, particularly the Culebra Dolomite Member, is considered critical for hydrologic site characterization. The Culebra is the most transmissive saturated unit above the WIPP repository and, as such, is considered to be the most likely pathway for radionuclide transport to the accessible environment in the unlikely event the repository is breached. Seven cores from the Culebra were recovered during drilling activities at the H-19 hydropad and detailed descriptions of these cores were made. On the basis of geologic descriptions, four hydrostratigraphic units were identified in the Culebra cores and were correlated with the mapping units from the WFP air intake shaft. The entire length of H-19b1 was cored and was described in detail. During coring of H-19b1, moisture was encountered in the upper part of the Dewey Lake Redbeds. A 41-ft-thick section of this core was selected for detailed description to qualify the geologic conditions related to perched water in the upper Dewey Lake. In addition to cuttings and core, a suite of geophysical logs run on the drillholes was used to identify and

  5. Geographic proximity to coal plants and U.S. public support for extending the Production Tax Credit

    International Nuclear Information System (INIS)

    Goldfarb, Jillian L.; Buessing, Marric; Kriner, Douglas L.

    2016-01-01

    The Production Tax Credit (PTC) is an important policy instrument through which the federal government promotes renewable energy development in the United States. However, the efficacy of the PTC is hampered by repeated expirations and short-term extensions, and by the general uncertainty surrounding its future status. We examine the factors driving variation in public support for the extension of the PTC using a nationally representative, internet-based survey. Americans living near a coal-fired power plant are significantly more likely to support extending the PTC than are their peers who are more insulated from the externalities of burning coal. The evidence for this dynamic was strongest and most statistically significant among subjects experimentally primed to think about the adverse health effects of burning coal. Raising awareness of the public health ramifications of generating electricity from fossil fuels holds the potential to increase support for renewable energy policies among those living in proximity to coal plants, even in a highly politicized policy debate. - Highlights: • Proximity to coal power plant increases support for Production Tax Credit. • Attitudes toward global warming influence support for PTC. • Raising awareness of health threat increases PTC support if living near coal plant.

  6. Ion exchange/adsorbent pilot plant

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    A decontamination of greater than 99% of the actinides and fission products contained in radioactive waste water can be obtained using ion exchange resins. A system for achieving this result is described in this paper. This ion exchange pilot-plant design is the culmination of five years of study of the decontamination of radioactive waste streams by ion exchange resins and other adsorbents at Mound. In order to maintain maximum flexibility of treatments, this pilot-plant design is a conceptual design with specific flows, resins, and column specifications, but with many optional features and no rigid equipment specifications. This flexibility allows the system to be amenable to almost any radioactive waste stream. Very specific designs can be constructed from this conceptual design for the treatment of any specific waste stream. Operating and capital costs are also discussed. 1 figure, 5 tables

  7. Environmental impacts of nuclear and coal-fired power plants

    International Nuclear Information System (INIS)

    Horyna, J.; Horynova, H.

    1984-01-01

    The current situation in the development of nuclear power in the world and in Czechoslovakia is briefly outlined and the possibilities are discussed of alternative energy resources. The environmental impact is described of conventional power plants firing coal; sulphur and nitrogen oxides are mentioned and their environmental impacts shown. Their quantities and the quantities of other gaseous, liquid and soid wastes produced by coal power plants are given. Annual estimates are presented of radioactive material emissions; trace amount emissions of toxic metals and their ecological risks are shown. Concern over the increasing concentration of CO 2 in the atmosphere is voiced. For nuclear power plants, the amount of radionuclides in stack emission and of those released into water flows is tabulated. Their effect on the aqueous ecosystem is characterized as is thermal pollution of water flows and the environmental impact of cooling towers. Other factors are also mentioned, such as the increased industrial land use, the effect of high voltage transmission lines and aesthetic effects. The conclusion is arrived at that the construction of nuclear power plants will eliminate the adverse environmental impact of emissions while the other impacts of the two types of power plants are comparable. (A.K.)

  8. Reducing water freshwater consumption at coal-fired power plants : approaches used outside the United States.

    Energy Technology Data Exchange (ETDEWEB)

    Elcock, D. (Environmental Science Division)

    2011-05-09

    Coal-fired power plants consume huge quantities of water, and in some water-stressed areas, power plants compete with other users for limited supplies. Extensive use of coal to generate electricity is projected to continue for many years. Faced with increasing power demands and questionable future supplies, industries and governments are seeking ways to reduce freshwater consumption at coal-fired power plants. As the United States investigates various freshwater savings approaches (e.g., the use of alternative water sources), other countries are also researching and implementing approaches to address similar - and in many cases, more challenging - water supply and demand issues. Information about these non-U.S. approaches can be used to help direct near- and mid-term water-consumption research and development (R&D) activities in the United States. This report summarizes the research, development, and deployment (RD&D) status of several approaches used for reducing freshwater consumption by coal-fired power plants in other countries, many of which could be applied, or applied more aggressively, at coal-fired power plants in the United States. Information contained in this report is derived from literature and Internet searches, in some cases supplemented by communication with the researchers, authors, or equipment providers. Because there are few technical, peer-reviewed articles on this topic, much of the information in this report comes from the trade press and other non-peer-reviewed references. Reducing freshwater consumption at coal-fired power plants can occur directly or indirectly. Direct approaches are aimed specifically at reducing water consumption, and they include dry cooling, dry bottom ash handling, low-water-consuming emissions-control technologies, water metering and monitoring, reclaiming water from in-plant operations (e.g., recovery of cooling tower water for boiler makeup water, reclaiming water from flue gas desulfurization [FGD] systems), and

  9. Pilot-scale tests for EB flue gas treatment process in Japan

    International Nuclear Information System (INIS)

    Sato, S.; Tokunaga, O.; Namba, H.

    1994-01-01

    A review of electron beam applications for flue gas treatment in Japan has been done. Several pilot plants are being performed for commercial use of electron beams process for cleaning of flue gas from low-sulfur coal burning boiler, a municipal waste incinerator and for removal of NO x from a ventilation exhaust of a highway tunnel. Outlines of three pilot-scale tests are introduced. 9 refs, 4 figs

  10. An Improved Flexible Solar Thermal Energy Integration Process for Enhancing the Coal-Based Energy Efficiency and NOx Removal Effectiveness in Coal-Fired Power Plants under Different Load Conditions

    Directory of Open Access Journals (Sweden)

    Yu Han

    2017-09-01

    Full Text Available An improved flexible solar-aided power generation system (SAPG for enhancing both selective catalytic reduction (SCR de-NOx efficiency and coal-based energy efficiency of coal-fired power plants is proposed. In the proposed concept, the solar energy injection point is changed for different power plant loads, bringing about different benefits for coal-fired power generation. For partial/low load, solar energy is beneficially used to increase the flue gas temperature to guarantee the SCR de-NOx effectiveness as well as increase the boiler energy input by reheating the combustion air. For high power load, solar energy is used for saving steam bleeds from turbines by heating the feed water. A case study for a typical 1000 MW coal-fired power plant using the proposed concept has been performed and the results showed that, the SCR de-NOx efficiency of proposed SAPG could increase by 3.1% and 7.9% under medium load and low load conditions, respectively, as compared with the reference plant. The standard coal consumption rate of the proposed SAPG could decrease by 2.68 g/kWh, 4.05 g/kWh and 6.31 g/kWh for high, medium and low loads, respectively, with 0.040 USD/kWh of solar generated electricity cost. The proposed concept opens up a novel solar energy integration pattern in coal-fired power plants to improve the pollutant removal effectiveness and decrease the coal consumption of the power plant.

  11. Atmospheric dispersion modeling of primary pollutants from electric power plants: Application to a coal-fired power plant

    International Nuclear Information System (INIS)

    McIlvaine, C.M.

    1994-01-01

    The normal operation of a power plant generally releases pollutants to the atmosphere. The objective of this paper is to describe a modeling method to estimate the changes in air pollutant concentrations that result from these emissions. This modeling approach is applicable to coal, biomass, oil, and natural gas technologies. As an example, this paper uses a hypothetical 500 megawatt (MW) coal-fired power plant, located at a Southeast Reference site in the U.S. and at a Southwest Reference Site. The pollutants resulting from the operation of the power plant may be classified as primary (emitted directly from the plant) or secondary (formed in the atmosphere from primary pollutants). The primary pollutants of interest in this paper are nitrogen oxides (NO x , sulfur dioxide SO 2 , particulate matter and metals

  12. Nano-mineralogical investigation of coal and fly ashes from coal-based captive power plant (India): An introduction of occupational health hazards

    International Nuclear Information System (INIS)

    Oliveira, Marcos L.S.; Marostega, Fabiane; Taffarel, Silvio R.; Saikia, Binoy K.; Waanders, Frans B.; DaBoit, Kátia; Baruah, Bimala P.

    2014-01-01

    Coal derived nano-particles has been received much concern recently around the world for their adverse effects on human health and the environment during their utilization. In this investigation the mineral matter present in some industrially important Indian coals and their ash samples are addressed. Coal and fly ash samples from the coal-based captive power plant in Meghalaya (India) were collected for different characterization and nano-mineralogy studies. An integrated application of advanced characterization techniques such as X-ray diffraction (XRD), High Resolution-Transmission Electron microscopy (HR-TEM)/(Energy Dispersive Spectroscopy) EDS/(selected-area diffraction pattern) SAED, Field Emission-Scanning Electron Microscopy (FE-SEM)/EDS analysis, and Mössbauer spectroscopy were used to know their extent of risks to the human health when present in coal and fly ash. The study has revealed that the coals contain mainly clay minerals, whilst glass fragments, spinel, quartz, and other minerals in lesser quantities were found to be present in the coal fly ash. Fly ash carbons were present as chars. Indian coal fly ash also found to contain nanominerals and ultrafine particles. The coal-fired power plants are observed to be the largest anthropogenic source of Hg emitted to the atmosphere and expected to increase its production in near future years. The Multi Walled Carbon Nano-Tubes (MWCNTs) are detected in our fly ashes, which contains residual carbonaceous matter responsible for the Hg capture/encapsulation. This detailed investigation on the inter-relationship between the minerals present in the samples and their ash components will also be useful for fulfilling the clean coal technology principles. - Highlights: • We research changes in the level of ultrafine and nanoparticles about coal–ash quality. • Increasing dates will increase human health quality in this Indian coal area. • Welfare effects depend on ex-ante or ex-post assumptions about

  13. Survey of radionuclide emissions from coal-fired power plants and examination of impacts from a proposed circulating fluidized bed boiler power plant

    International Nuclear Information System (INIS)

    Steiner, C.P.; Militana, L.M.; Harvey, K.A.; Kinsey, G.D.

    1995-01-01

    This paper presents the results of a literature survey that examined radionuclide emissions from coal-fired power plants. Literature references from both the US and foreign countries are presented. Emphasis is placed on references from the US because the radionuclide emissions from coal-fired power plants are related to radionuclide concentrations in the coal, which vary widely throughout the world. The radionuclides were identified and quantified for various existing power plants reported in the literature. Applicable radionuclide emissions criteria discovered in the literature search were then applied to a proposed circulating fluidized bed boiler power plant. Based upon the derived radionuclide emission rates applied to the proposed power plant, an air quality modeling analysis was performed. The estimated ambient concentrations were compared to the most relevant existing regulatory ambient levels for radionuclides

  14. JV TASK 45-MERCURY CONTROL TECHNOLOGIES FOR ELECTRIC UTILITIES BURNING LIGNITE COAL, PHASE I BENCH-AND PILOT-SCALE TESTING

    Energy Technology Data Exchange (ETDEWEB)

    John H. Pavlish; Michael J. Holmes; Steven A. Benson; Charlene R. Crocker; Edwin S. Olson; Kevin C. Galbreath; Ye Zhuang; Brandon M. Pavlish

    2003-10-01

    The Energy & Environmental Research Center has completed the first phase of a 3-year, two-phase consortium project to develop and demonstrate mercury control technologies for utilities that burn lignite coal. The overall project goal is to maintain the viability of lignite-based energy production by providing utilities with low-cost options for meeting future mercury regulations. Phase I objectives are to develop a better understanding of mercury interactions with flue gas constituents, test a range of sorbent-based technologies targeted at removing elemental mercury (Hg{sup o}) from flue gases, and demonstrate the effectiveness of the most promising technologies at the pilot scale. The Phase II objectives are to demonstrate and quantify sorbent technology effectiveness, performance, and cost at a sponsor-owned and operated power plant. Phase I results are presented in this report along with a brief overview of the Phase II plans. Bench-scale testing provided information on mercury interactions with flue gas constituents and relative performances of the various sorbents. Activated carbons were prepared from relatively high-sodium lignites by carbonization at 400 C (752 F), followed by steam activation at 750 C (1382 F) and 800 C (1472 F). Luscar char was also steam-activated at these conditions. These lignite-based activated carbons, along with commercially available DARCO FGD and an oxidized calcium silicate, were tested in a thin-film, fixed-bed, bench-scale reactor using a simulated lignitic flue gas consisting of 10 {micro}g/Nm{sup 3} Hg{sup 0}, 6% O{sub 2}, 12% CO{sub 2}, 15% H{sub 2}O, 580 ppm SO{sub 2}, 120 ppm NO, 6 ppm NO{sub 2}, and 1 ppm HCl in N{sub 2}. All of the lignite-based activated (750 C, 1382 F) carbons required a 30-45-minute conditioning period in the simulated lignite flue gas before they exhibited good mercury sorption capacities. The unactivated Luscar char and oxidized calcium silicate were ineffective in capturing mercury. Lignite

  15. Waste water pilot plant research, development, and demonstration permit application

    International Nuclear Information System (INIS)

    1993-03-01

    This permit application has been prepared to obtain a research, development, and demonstration permit to perform pilot-scale treatability testing on the 242-A Evaporator process condensate waste water effluent stream. It provides the management framework, and controls all the testing conducted in the waste water pilot plant using dangerous waste. It also provides a waste acceptance envelope (upper limits for selected constituents) and details the safety and environmental protection requirements for waste water pilot plant testing. This permit application describes the overall approach to testing and the various components or requirements that are common to all tests. This permit application has been prepared at a sufficient level of detail to establish permit conditions for all waste water pilot plant tests to be conducted

  16. Sono-photo-degradation of carbamazepine in a thin falling film reactor: Operation costs in pilot plant.

    Science.gov (United States)

    Expósito, A J; Patterson, D A; Monteagudo, J M; Durán, A

    2017-01-01

    The photo-Fenton degradation of carbamazepine (CBZ) assisted with ultrasound radiation (US/UV/H 2 O 2 /Fe) was tested in a lab thin film reactor allowing high TOC removals (89% in 35min). The synergism between the UV process and the sonolytic one was quantified as 55.2%. To test the applicability of this reactor for industrial purposes, the sono-photo-degradation of CBZ was also tested in a thin film pilot plant reactor and compared with a 28L UV-C conventional pilot plant and with a solar Collector Parabolic Compound (CPC). At a pilot plant scale, a US/UV/H 2 O 2 /Fe process reaching 60% of mineralization would cost 2.1 and 3.8€/m 3 for the conventional and thin film plant respectively. The use of ultrasound (US) produces an extra generation of hydroxyl radicals, thus increasing the mineralization rate. In the solar process, electric consumption accounts for a maximum of 33% of total costs. Thus, for a TOC removal of 80%, the cost of this treatment is about 1.36€/m 3 . However, the efficiency of the solar installation decreases in cloudy days and cannot be used during night, so that a limited flow rate can be treated. Copyright © 2016 Elsevier B.V. All rights reserved.

  17. Future CO2 emissions and electricity generation from proposed coal-fired power plants in India

    Science.gov (United States)

    Shearer, Christine; Fofrich, Robert; Davis, Steven J.

    2017-04-01

    With its growing population, industrializing economy, and large coal reserves, India represents a critical unknown in global projections of future CO2 emissions. Here, we assess proposed construction of coal-fired power plants in India and evaluate their implications for future emissions and energy production in the country. As of mid-2016, 243 gigawatts (GW) of coal-fired generating capacity are under development in India, including 65 GW under construction and an additional 178 GW proposed. These under-development plants would increase the coal capacity of India's power sector by 123% and, when combined with the country's goal to produce at least 40% of its power from non-fossil sources by 2030, exceed the country's projected future electricity demand. The current proposals for new coal-fired plants could therefore either "strand" fossil energy assets (i.e., force them to retire early or else operate at very low capacity factors) and/or ensure that the goal is not met by "locking-out" new, low-carbon energy infrastructure. Similarly, future emissions from the proposed coal plants would also exceed the country's climate commitment to reduce its 2005 emissions intensity 33% to 35% by 2030, which—when combined with the commitments of all other countries—is itself not yet ambitious enough to meet the international goal of holding warming well below 2°C relative to the pre-industrial era.

  18. Life cycle assessment of coal-fired power plants and sensitivity analysis of CO2 emissions from power generation side

    Science.gov (United States)

    Yin, Libao; Liao, Yanfen; Zhou, Lianjie; Wang, Zhao; Ma, Xiaoqian

    2017-05-01

    The life cycle assessment and environmental impacts of a 1000MW coal-fired power plant were carried out in this paper. The results showed that the operation energy consumption and pollutant emission of the power plant are the highest in all sub-process, which accounts for 93.93% of the total energy consumption and 92.20% of the total emission. Compared to other pollutant emissions from the coal-fired power plant, CO2 reached up to 99.28%. Therefore, the control of CO2 emission from the coal-fired power plants was very important. Based on the BP neural network, the amount of CO2 emission from the generation side of coal-fired power plants was calculated via carbon balance method. The results showed that unit capacity, coal quality and unit operation load had great influence on the CO2 emission from coal-fired power plants in Guangdong Province. The use of high volatile and high heat value of coal also can reduce the CO2 emissions. What’s more, under higher operation load condition, the CO2 emissions of 1 kWh electric energy was less.

  19. Use of new ceramic linings in coal preparation plants

    Energy Technology Data Exchange (ETDEWEB)

    Fedorchenko, V.E.; Rudenko, V.A.; Bondarev, A.Ya.

    1984-01-01

    This article evaluates several materials used as liners in coal preparation equipment. The evaluations concentrate on liners used under conditions of intensive temperature fluctuations, e.g. liners of coal chutes for coal transport from coal dryers. Two aspects of wear are analyzed: abrasion by friction and effects of temperature fluctuations. Abrasive wear is tested using magnetite suspension with a density of 400 g/l. Tests show that abrasive wear of liners on an alumina basis is 3 times lower than abrasive wear of high quality steel, from 13 to 24 times lower than that of iron and from 6 to 8 times lower than that of steels used in coal preparation plants. Effects of temperature fluctuations from 20 to 840 C on abrasive wear of liners of steels, iron, slag glass ceramics, mullite-corundum material and corundum is shown in a table. The test show that mullite-corundum material on the basis of alumina is characterized by a high resistance to abrasive wear after 30 cycles of temperature increase from 20 to 840 C and decrease to 20 C. Using mullite-corundum as liners of equipment and installations operating under conditions of temperature fluctuations is recommended.

  20. Solids throttling valves for coal conversion and utilization development. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Sine, G.C.

    1980-11-01

    A complete test system to test, evaluate, and develop control valves for slurry letdown service in coal liquefaction plants is needed. The site identified for the test system was the SRC II Pilot Plant located at Ft. Lewis, Washington. The US Department of Energy, Morgantown Energy Technology Center, requested a test system design that would enable testing of various configuration letdown valves that would be compatible with the existing facility and have minimum impact on Pilot Plant operations. Drawings and specifications for such a test system were prepared, coordinated with Ft. Lewis personnel, revised to reflect Ft. Lewis operating personnel comments, and approved for use by the Morgantown Energy Technology Center. These drawings and specifications will enable the test system to be built, installed, and integrated with the existing facility by a general contractor.

  1. Local Impacts of Mercury Emissions from the Three Pennsylvania Coal Fired Power Plants.

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan,T.; Adams,J.; Bender, M.; Bu, C.; Piccolo, N.; Campbell, C.

    2008-02-01

    The Clean Air Interstate Rule (CAIR) and the Clean Air Mercury Rule (CAMR) as proposed by the U.S. Environmental Protection Agency (EPA) when fully implemented will lead to reduction in mercury emissions from coal-fired power plants by 70 percent to fifteen tons per year by 2018. The EPA estimates that mercury deposition would be reduced 8 percent on average in the Eastern United States. The CAMR permits cap-and-trade approach that requires the nationwide emissions to meet the prescribed level, but do not require controls on each individual power plant. This has led to concerns that there may be hot-spots of mercury contamination near power plants. Partially because of this concern, many states including Pennsylvania have implemented, or are considering, state regulations that are stricter on mercury emissions than those in the CAMR. This study examined the possibility that coal-fired power plants act as local sources leading to mercury 'hot spots'. Soil and oak leaf samples from around three large U.S. coal-fired power plants in Western Pennsylvania were collected and analyzed for evidence of 'hot spots'. These three plants (Conemaugh, Homer City, and Keystone) are separated by a total distance of approximately 30 miles. Each emits over 500 pounds of mercury per year which is well above average for mercury emissions from coal plants in the U.S. Soil and oak leaf sampling programs were performed around each power plant. Sampling rings one-mile apart were used with eight or nine locations on each ring. The prevailing winds in the region are from the west. For this reason, sampling was conducted out to 10 miles from the Conemaugh plant which is southeast of the others. The other plants were sampled to a distance of five miles. The objectives were to determine if local mercury hot spots exist, to determine if they could be attributed to deposition of coal-fired power plant emissions, and to determine if they correlated with wind patterns. The study

  2. Water use at pulverized coal power plants with postcombustion carbon capture and storage.

    Science.gov (United States)

    Zhai, Haibo; Rubin, Edward S; Versteeg, Peter L

    2011-03-15

    Coal-fired power plants account for nearly 50% of U.S. electricity supply and about a third of U.S. emissions of CO(2), the major greenhouse gas (GHG) associated with global climate change. Thermal power plants also account for 39% of all freshwater withdrawals in the U.S. To reduce GHG emissions from coal-fired plants, postcombustion carbon capture and storage (CCS) systems are receiving considerable attention. Current commercial amine-based capture systems require water for cooling and other operations that add to power plant water requirements. This paper characterizes and quantifies water use at coal-burning power plants with and without CCS and investigates key parameters that influence water consumption. Analytical models are presented to quantify water use for major unit operations. Case study results show that, for power plants with conventional wet cooling towers, approximately 80% of total plant water withdrawals and 86% of plant water consumption is for cooling. The addition of an amine-based CCS system would approximately double the consumptive water use of the plant. Replacing wet towers with air-cooled condensers for dry cooling would reduce plant water use by about 80% (without CCS) to about 40% (with CCS). However, the cooling system capital cost would approximately triple, although costs are highly dependent on site-specific characteristics. The potential for water use reductions with CCS is explored via sensitivity analyses of plant efficiency and other key design parameters that affect water resource management for the electric power industry.

  3. General Atomic Reprocessing Pilot Plant: engineering-scale dissolution system description

    International Nuclear Information System (INIS)

    Yip, H.H.

    1979-04-01

    In February 1978, a dissolver-centrifuge system was added to the cold reprocessing pilot plant at General Atomic Company, which completed the installation of an HTGR fuel head-end reprocessing pilot plant. This report describes the engineering-scale equipment in the pilot plant and summarizes the design features derived from development work performed in the last few years. The dissolver operating cycles for both thorium containing BISO and uranium containinng WAR fissile fuels are included. A continuous vertical centrifuge is used to clarify the resultant dissolver product solution. Process instrumentation and controls for the system reflect design philosophy suitable for remote operation

  4. UNEP Demonstrations of Mercury Emission Reduction at Two Coal-fired Power Plants in Russia

    Directory of Open Access Journals (Sweden)

    Jozewicz W.

    2013-04-01

    Full Text Available The United Nations Environment Programme (UNEP partnership area “Mercury releases from coal combustion” (The UNEP Coal Partnership has initiated demonstrations of mercury air emission reduction at two coal-fired power plants in Russia. The first project has modified the wet particulate matter (PM scrubber installed in Toliatti thermal plant to allow for addition of chemical reagents (oxidants into the closedloop liquid spray system. The addition of oxidant resulted in significant improvement of mercury capture from 20% total mercury removal (without the additive up to 60% removal (with the additive. It demonstrates the effectiveness of sorbent injection technologies in conjunction with an electrostatic precipitator (ESP. ESPs are installed at 60%, while wet PM scrubbers are installed at 30% of total coal-fired capacity in Russia. Thus, the two UNEP Coal Partnership projects address the majority of PM emission control configurations occurring in Russia.

  5. Use of hold-gro erosion control fabric in the establishment of plant species on coal mine soil.

    Science.gov (United States)

    Day, A D; Ludeke, K L

    1986-09-01

    Experiments were conducted on the Black Mesa Coal Mine, Kayenta, Arizona in 1977 and 1978 to study the effectiveness of Hold-Gro Erosion Control Fabric (a product from the Gulf States Paper Corporation, Tuscaloosa, Alabama) in the establishment of plants on coal mine soil following the surface mining of coal. Four plant species were planted: (1) spring barley (Horduem vulgare L.), an annual grass (2) crested wheatgrass (Agropyron cristatum L.), a perennial grass (3) alfalfa (lucerne) (Medicago sativa L.), a perennial legume and (4) fourwing saltbush (Atriplex canescens Pursh.), a perennial shrub. Seeds of each plant species were planted in reclaimed coal mine soil in the spring of the year by both broadcast seeding (conventional culture) and the incorporation of seeds in Hold-Gro Erosion Control Fabric. Average numbers of seedlings established and percent ground cover for all species studied were higher in areas where conventional culture was used than they were in areas where seeds were incorporated in Hold-Gro Erosion Control Fabric. The incorporation of seeds in Hold-Gro Erosion Control Fabric in the establishment of plant species on coal mine soil was not an effective cultural practice in the southwestern United States.

  6. Use of Hold-Gro Erosion Control Fabric in the establishment of plant species on coal mine soil

    Energy Technology Data Exchange (ETDEWEB)

    Day, A.D.; Ludeke, K.L.

    1986-09-01

    Experiments were conducted on the Black Mesa Coal Mine, Kayenta, Arizona in 1977 and 1978 to study the effectiveness of Hold-Gro Erosion Control Fabric (a product from the Gulf States Paper Corporation, Tuscaloosa, Alabama) in the establishment of plants on coal mine soil following the surface mining of coal. Four plant species were planted: spring barley (Horduem vulgare L.), an annual grass; crested wheatgrass (Agropyron cristatum L.), a perennial grass; alfalfa (lucerne) (Medicago sativa L.), a perennial legume; and fourwing saltbush (Atriplex canescens Pursh.), a perennial shrub. Seeds of each plant species were planted in reclaimed coal mine soil in the spring of the year by both broadcast seeding (conventional culture) and the incorporation of seeds in Hold-Gro Erosion Control Fabric. Average numbers of seedlings established and percent ground cover for all species studied were higher in areas where conventional culture was used than they were in areas where seeds were incorporated in Hold-Gro Erosion Control Fabric. The incorporation of seeds in Hold-Gro Erosion Control Fabric in the establishment of plant species on coal mine soil was not an effective cultural practice in the southwestern United States. 11 refs.

  7. The pilot plant for electron beam food processing

    Science.gov (United States)

    Migdal, W.; Walis, L.; Chmielewski, A. G.

    1993-07-01

    In the frames of the national programme on the application of irradiation for food preservation and hygienization an experimental plant for electron beam processing has been established in INCT. The pilot plant has been constructed inside an old fort what decreases significantly the cost of the investment. The pilot plant is equipped with a small research accelerator Pilot (10 MeV, 1 kW) and an industrial unit Elektronika (10 MeV, 10 kW). This allows both laboratory and full technological scale testing of the elaborated process to be conducted. The industrial unit is being equipped with e-/X conversion target, for high density products irradiation. On the basis of the research there were performed at different scientific institutions in Poland, health authorities have issued permissions for permanent treatment of spices, garlic, onions and temporary permissions for mushrooms, and potatoes. Dosimetric methods have been elaborated for the routine use at the plant. In the INCT laboratory methods for the control of e-/X treated food have been established.

  8. The pilot plant for electron beam food processing

    International Nuclear Information System (INIS)

    Migdal, W.; Kosmal, W.; Malec-Czechowska, K.; Maciszewski, W.

    1992-01-01

    In the frames of the national programme on the application of irradiation for food preservation and hygienization an experimental plant for electron beam processing has been established in INCT. The pilot plant has been constructed inside an old fort what decreases significantly the cost of the investment. The pilot plants is equipped with a small research accelerator Pilot (10 MeV, 1 kW) and an industrial unit Elektronika (10 MeV, 10 kW). This allows both laboratory and full technological scale testing of the elaborated process to be conducted. The industrial unit is being equipped with e-/X conversion target, for high density products irradiation. On the basis of the research there were performed at different scientific institutions in Poland, health authorities have issued permissions for permanent treatment of spices, garlic, onions and temporary permissions for mushrooms, and potatoes. Dosimetric methods have been elaborated for the routine use at the plant. In the INCT laboratory methods for the control of e-/X treated food have been established. (author). 9 refs, 5 figs, 1 tab

  9. Pilot plant for exploitation of geothermal waters

    Directory of Open Access Journals (Sweden)

    Stojiljković Dragan T.

    2006-01-01

    Full Text Available In Sijarinska spa, there are some 15 mineral and thermomineral springs, that are already being used for therapeutic purposes. For the exploitation of heat energy boring B-4 is very interesting. It is a boring of a closed type, with the water temperature of about 78°C and a flow rate of about 33 l/s. Waters with the flow rate of about 6 l/s are currently used for heating of the Gejzer hotel, and waters of the flow rate of about 0,121 l/s for the pilot drying plant. The paper presents this pilot plant. .

  10. Instrumental neutron activation analysis of coal and its combustion residues from a power plant

    International Nuclear Information System (INIS)

    Lim, J.M.; Jeong, J.H.; Lee, J.H.

    2013-01-01

    A growing demand of electrical energy derived from coal combustion led to a significant increase of coal ash as residues. Approximately 70 % of the fly ashes are recycled, while most of the bottom ashes have been land-filled in the ash pond in Korea. In this work, to evaluate the potential impacts of the residues from a coal power plant on the environment, its inorganic elemental components were determined by INAA and PGAA. Coal ash samples were collected from the biggest power plant complex in Korea. These samples were analyzed by using the NAA facilities in the HANARO research reactor of the Korea Atomic Energy Research Institute. A total of 31 elements were analyzed in the samples, and certified reference materials were used for the analytical quality control. The enrichment status of a given metal in fuel coal and ashes was investigated by its concentration ratio. In order to assess the impact of the coal combustion residues on ecosystem, their concentrations determined for each respective type of the samples were compared to both reference data and nearby beach sand samples. (author)

  11. Experimental Investigation and Modelling of a Wet Flue Gas Desulphurisation Pilot Plant

    DEFF Research Database (Denmark)

    Kiil, Søren; Michelsen, Michael Locht; Dam-Johansen, Kim

    1998-01-01

    A detailed model for a wet flue gas desulphurisation (FGD) pilot plant, based on the packed tower concept, has been developed. All important rate determining steps, absorption of SO2, oxidation of HSO3-, dissolution of limestone, and crystallisation of gypsum were included. Population balance...... equations, governing the description of particle size distributions of limestone in the plant, were derived. Model predictions were compared to experimental data such as gas phase concentration profiles of SO2, slurry pH-profiles, solids content of the slurry, liquid phase concentrations, and residual...

  12. Biochemical Removal of HAP Precursors from Coal

    Energy Technology Data Exchange (ETDEWEB)

    Olson, Gregory J

    1997-05-12

    Column biooxidation tests with Kentucky coal confirmed results of earlier shake flask tests showing significant removal from the coal of arsenic, selenium, cobalt, manganese, nickel and cadmium. Rates of pyrite biooxidation in Kentucky coal were only slightly more than half the rates found previously for Indiana and Pittsburgh coals. Removal of pyrite from Pittsburgh coal by ferric ion oxidation slows markedly as ferrous ions accumulate in solution, requiring maintenance of high redox potentials in processes designed for removal of pyrite and hazardous air pollutant (HAP) precursors by circulation of ferric solutions through coal. The pyrite oxidation rates obtained in these tests were used by Unifield Engineering to support the conceptual designs for alternative pyrite and HAP precursor bioleaching processes for the phase 2 pilot plant. Thermophilic microorganisms were tested to determine if mercury could be mobilized from coal under elevated growth temperatures. There was no evidence for mercury removal from coal under these conditions. However, the activity of the organisms may have liberated mercury physically. It is also possible that the organisms dissolved mercury and it readsorbed to the clay preferentially. Both of these possibilities are undergoing further testing. The Idaho National Engineering and Environmental Laboratory's (INEEL) slurry column reactor was operated and several batches of feed coal, product coal, waste solids and leach solutions were submitted to LBL for HAP precursor analysis. Results to date indicate significant removal of mercury, arsenic and other HAP precursors in the combined physical-biological process.

  13. Oxygen-Fired CO{sub 2} Recycle for Application to Direct CO{sub 2} Capture form Coal-Fired Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Gale

    2010-09-26

    The Southern Research/Southern Company 1 MWth Pilot-Scale Coal-Fired Test Facility was successfully retrofit to fire in either the traditional air-fired mode or with 100% oxygen and recycled flue gas, with a fully integrated feedback and control system, including oxygen and recycled flue gas modulation during startup, transfer, and shutdown, safety and operational interlocks, and data acquisition. A MAXON Staged Oxygen Burner for Oxy-Coal Applications produced a stable flame over a significant range of firing turn-down, staging, and while firing five different U.S. coal types. The MAXON burner design produces lower flame temperatures than for air firing, which will enable (A) Safe operation, (B) Reduction of recycle flow without concern about furnace flame temperatures, and (C) May likely be affective at reducing slagging and fouling in the boiler and super heater at full-scale Power Plants. A CFD model of the Oxy-fired Combustion Research Facility (OCRF) was used to predict the flame geometry and temperatures in the OCRF and make a comparison with the air-fired case. The model predictions were consistent with the experimental data in showing that the MAXON burner fired with oxygen produced lower flame temperatures than the air-fired burner while firing with air.

  14. Commissioning and maintenance experience of in-plant coal handling system of captive power plant at HWP, Manuguru (Paper No. 5.4)

    International Nuclear Information System (INIS)

    Murugappan, K.; Mohan Rao, A.C.; Sastry, M.S.N.

    1992-01-01

    For achieving a non-stop generation of power for a minimum period of one year can be a reality only if due importance is given to inplant coal handling system. The paper highlights the major commissioning and maintenance problem faced and corrective action taken for inplant coal handling system of the captive power plant at Heavy Water Plant, Manuguru. (author)

  15. Coal Preparation and Processing Plants New Source Performance Standards (NSPS)

    Science.gov (United States)

    Learn about the NSPS regulation for coal preparation and processing plants by reading the rule summary, the rule history, the code of federal regulation text, the federal register, and additional docket documents

  16. Environmental and health problems in connection with coal use in Romanian power plants

    International Nuclear Information System (INIS)

    Matei, M.

    1995-01-01

    Emission limits to solid fuel fired boilers are to be applied in Romania from January 1998; total airborne coal dust in RENEL (Romanian Electricity Authority) power plants handling areas is regulated by National Work Protection Norms to 8 mg/m 3 air; and maximum levels of radiation are regulated by Romanian Radio protection Norms. The article discusses RENEL's recent measurements of CO, NO x and SO 2 emissions in flue gas of their coal-fired power plants. Assessments of airborne dust concentrations in different work places within RENEL's power plants have been made and have helped identify the must dangerous sites and the causes of high dust concentrations. Experimental work on dust collection facilities is under way. Results are presented of natural radioactive concentrations of 238 U, 236 Ra, 232 Th and 40 K as well as β-total activity of coal samples collected from different RENEL power plants. Work is in progress to improve performance of electrostatic precipitators for collecting fly ash and to improve fly ash disposal. 2 figs., 7 tabs

  17. Coal

    International Nuclear Information System (INIS)

    Teissie, J.; Bourgogne, D. de; Bautin, F.

    2001-12-01

    Coal world production represents 3.5 billions of tons, plus 900 millions of tons of lignite. 50% of coal is used for power generation, 16% by steel making industry, 5% by cement plants, and 29% for space heating and by other industries like carbo-chemistry. Coal reserves are enormous, about 1000 billions of tons (i.e. 250 years of consumption with the present day rate) but their exploitation will be in competition with less costly and less polluting energy sources. This documents treats of all aspects of coal: origin, composition, calorific value, classification, resources, reserves, production, international trade, sectoral consumption, cost, retail price, safety aspects of coal mining, environmental impacts (solid and gaseous effluents), different technologies of coal-fired power plants and their relative efficiency, alternative solutions for the recovery of coal energy (fuel cells, liquefaction). (J.S.)

  18. Radionuclide emissions from a coal-fired power plant

    International Nuclear Information System (INIS)

    Amin, Y.M.; Uddin Khandaker, Mayeen; Shyen, A.K.S.; Mahat, R.H.; Nor, R.M.; Bradley, D.A.

    2013-01-01

    Current study concerns measurement of radioactivity levels in areas surrounding a 2420 MW thermal power plant fueled predominantly by bituminous coal. The concentrations of 226 Ra, 232 Th and 40 K in onsite bottom-ash were found to be 139 Bq/kg, 108 Bq/kg and 291 Bq/kg, respectively, the levels for these radiolnuclides in soil decreasing with distance from the power plant. At the plant perimeter the respective radionuclide concentrations were 87 Bq/kg, 74 Bq/kg and 297 Bq/kg. In a nearby town, the corresponding concentrations were 104 Bq/kg, 52 Bq/kg and 358 Bq/kg, suggestive of use of TENORM affected soils. The mean radium equivalent activities (Ra eq ) in soil and ash sample in the town were 205 Bq/kg and 316 Bq/kg, respectively. The Kapar plant ash/slag appears to contain a higher level of TENORM than the world average. The degree of contamination is much higher inside the town where slag has been mixed with topsoil as landfill or as simple domestic waste. For the prevailing levels of exposure and a worst case senario, the predicted committed effective dose due to ingestion and inhalation for intake durations of 1- and 30 years would be 4.2 μSv and 220 μSv, respectively. - Highlights: • Detailed studies on naturally occuring radionuclide emissions due to a 2420 MW coal-fired power plant in Malaysia. • Assessment of radiation exposures to the public around the power plant due to an intake of the radionuclides. • The Kapar plant ash/slag appears to contain a higher level of TENORM than the world average. • The degree of contamination is much higher inside the town where slag has been mixed with topsoil as landfill or as simple domestic waste

  19. Non-greenhouse gas emissions from coal-fired power plants in China

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-04-15

    Within the Twelth Five-Year Plan, the Chinese Government has made addressing air quality problems a key environmental priority, with an intention to accelerate the development of systems, institutions and a technical knowledge base for sustained improvement. A major focus is on the coal power sector for which standards have been introduced that require the installation of modern, very high efficiency SO2, NOx and particulates emissions control systems. Nine key regions, which are facing very significant air quality challenges, are the three major economic zones around the cities of Beijing, Shanghai (Yangtze River Delta) and Guangzhou (Pearl River Delta), together with six areas around the cities of Shenyang, Changsha, Wuhan, Chengdu Chongqing, the Shandong peninsula, and the coastal area west of the Taiwan strait. These regions comprise the population and economic centres of the country, accounting for 64% of national GDP, 43% of total energy use, and 39% of the population. In these locations, all existing and new coal-fired power plants will have to achieve particulate, SO2 and NOx emissions limits of 20, 50 and 100 mg/m3 respectively, with new plants expected to meet the standards from 1 January 2012 and existing plants by 1 July 2014. At the same time, there will be an increasing emphasis on limiting any new coal-fired power plants in these regions. For the rest of the country, the standards are not quite so strict and the SO2 limits for existing plants are less severe than for new plants. The new pollutant that will be regulated on coal-fired power plants is mercury and its compounds, for which the limit has been set at a level that represents a core control. This means that providing the power plant operator meets the new particulate, SO2 and NOx standards then the mercury standard should be met without the need to introduce an additional capture device, although the emissions level will have to be measured on a regular basis. From a global perspective, this

  20. The UCOR pilot plant and the development of axial flow compressors

    International Nuclear Information System (INIS)

    Grant, W.

    1984-01-01

    This article discusses some of the mechanical aspects of the Uranium Enrichment Corporation of South Africa (Pty) Ltd. (UCOR) pilot plant. The most important mechanical components in a typical stage in the pilot plant, consists of a compressor which is used to compress the process gas mixture. After air cooling to almost room temperature, the mixture is fed through the separation elements. Other components are two pressure vessels connected to the compressor. The development and characteristics of the pilot plant is described in the article

  1. Monetization of External Costs Using Lifecycle Analysis—A Comparative Case Study of Coal-Fired and Biomass Power Plants in Northeast China

    Directory of Open Access Journals (Sweden)

    Lingling Wang

    2015-02-01

    Full Text Available In this study, the structures of external costs are built in line with coal-fired and biomass power plant life cycle activities in Northeast China. The external cost of coal-fired and biomass power plants was compared, using the lifecycle approach. In addition, the external costs of a biomass power plant are calculated for each stage for comparison with those of a coal-fired power plant. The results highlight that the external costs of a coal-fired plant are 0.072 US $/kWh, which are much higher than that of a biomass power plant, 0.00012 US$/kWh. The external cost of coal-fired power generation is as much as 90% of the current price of electricity generated by coal, while the external cost of a biomass power plant is 1/1000 of the current price of electricity generated by biomass. In addition, for a biomass power plant, the external cost associated with SO2, NOX, and PM2.5 are particularly lower than those of a coal-fired power plant. The prospect of establishing precise estimations for external cost mechanisms and sustainable energy policies is discussed to show a possible direction for future energy schemes in China. The paper has significant value for supporting the biomass power industry and taxing or regulating coal-fired power industry to optimize the energy structure in China.

  2. Strategic planning on carbon capture from coal fired plants in Malaysia and Indonesia: A review

    International Nuclear Information System (INIS)

    Othman, M.R.; Martunus; Zakaria, R.; Fernando, W.J.N.

    2009-01-01

    Malaysia and Indonesia benefit in various ways by participating in CDM and from investments in the GHG emission reduction projects, inter alia, technology transfer such as carbon capture (CC) technology for the existing and future coal fired power plants. Among the fossil fuel resources for energy generation, coal is offering an attractive solution to the increasing fuel cost. The consumption of coal in Malaysia and Indonesia is growing at the fastest rate of 9.7% and 4.7%, respectively, per year since 2002. The total coal consumption for electricity generation in Malaysia is projected to increase from 12.4 million tons in 2005 to 36 million tons in 2020. In Indonesia, the coal consumption for the same cause is projected to increase from 29.4 million tons in 2005 to 75 million tons in 2020. CO 2 emission from coal fired power plants are forecasted to grow at 4.1% per year, reaching 98 million tons and 171 million tons in Malaysia and Indonesia, respectively.

  3. Industrial Fuel Gas Demonstration Plant Program. Monthly, quarterly and annual progress report, December 1978 and Calender Year 1978

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-01

    A new pilot plant program developed by DOE and the team members, was started on September 20, 1978. Pilot plant success was achieved in obtaining an ash balanced condition for several days with ash agglomeration with a pure coal feed. This was the objective of the first three months of the approved program.

  4. Coal -98

    International Nuclear Information System (INIS)

    Sparre, C.

    1998-01-01

    The following report deals with the use of coal and coke during 1997. Some information about technic, environmental questions and markets are also given. Data have been collected by questionnaires to major users and by telephone to minor users. Preliminary statistical data from SCB have also been used. The use of steam coal for heating purposes during 1997 was 730 000 tons and about 500 000 tons lower than in 1996. The extremely high figures of 1996 were due to twice the production of electricity because of lack of hydro power. The co-generation plants were the main users of coal. The minor plants have increased their use of forest fuels. Probably the use of steam coal will go down in the immediate years both in the heat generating and the co-generating plants. Some foreign analysts, however, estimate a doubled use of coal for energy use after 2020 because of the plans to phase out the nuclear power. During the top year 1987 coal was used in 18 hot water plants and 11 co-generation plants. 1997 these figures are 2 and 8. Taxes and environmental reasons explain this trend. The use of steam coal in the industry has been constant at the level 700 000 tons. This level is supposed to be constant or to vary with business cycles. The import of metallurgical coal in 1997 was 1.6 mill tons like the year before. 1.2 mill tons coke were produced. The coke consumption in the industry was 1.5 Mill tons. 0.3 mill tons of coke were imported. Several other plants have plans to replace the coal with forest fuels, waste fuels and NG. Even the biggest plant, Vaesteraas, has plans to build a block for bio fuels. Helsingborg has started to use wood pellets. The pellets replace most of the coal for the heat production in the co-generation plant. Norrkoeping Kraft AB has taken a fluid bed boiler for different fuels in operation, leading to more than half the coal consumption compared with previous years. They have also rebuilt one of their travelling grates for bio fuels. Stockholm

  5. Investigation of flow behaviour of coal particles in a pilot-scale fluidized bed gasifier (FBG) using radiotracer technique.

    Science.gov (United States)

    Pant, H J; Sharma, V K; Kamudu, M Vidya; Prakash, S G; Krishanamoorthy, S; Anandam, G; Rao, P Seshubabu; Ramani, N V S; Singh, Gursharan; Sonde, R R

    2009-09-01

    Knowledge of residence time distribution (RTD), mean residence time (MRT) and degree of axial mixing of solid phase is required for efficient operation of coal gasification process. Radiotracer technique was used to measure the RTD of coal particles in a pilot-scale fluidized bed gasifier (FBG). Two different radiotracers i.e. lanthanum-140 and gold-198 labeled coal particles (100 gm) were independently used as radiotracers. The radiotracer was instantaneously injected into the coal feed line and monitored at the ash extraction line at the bottom and gas outlet at the top of the gasifier using collimated scintillation detectors. The measured RTD data were treated and MRTs of coal/ash particles were determined. The treated data were simulated using tanks-in-series model. The simulation of RTD data indicated good degree of mixing with small fraction of the feed material bypassing/short-circuiting from the bottom of the gasifier. The results of the investigation were found useful for optimizing the design and operation of the FBG, and scale-up of the gasification process.

  6. Solvent refined coal (SRC) process. Annual technical progress report, January 1979-December 1979

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    This report discusses the effects on SRC yields of seven process variables (reactor temperature, SRT, hydrogen partial pressure, recycle ash and coal concentrations, gas velocity and coal type) predicted by second-order regression models developed from a data base containing pilot plant data with both Kentucky and Powhatan coals. The only effect of coal type in the model is a shift in each yield by a constant factor. Although some differences were found between the models developed from the Kentucky data base (1) (which we call Kentucky models) and the pooled coal models, the general conclusions of the previous report are confirmed by the new models and the assumption of similar behavior of the two coals appears to be justified. In some respects the dependence of the yields (MAF coal basis) on variables such as pressure and temperature are clearer than in the previous models. The principal trends which emerge are discussed.

  7. Coal 95

    International Nuclear Information System (INIS)

    Sparre, C.

    1995-01-01

    The report deals with the use of coal and coke in Sweden during 1994. Some information about technology, environmental questions and markets are also given. Data have been collected by questionnaires to major users and by telephone to minor users. Preliminary statistical data from Statistics Sweden have also been used.The use of steam coal for heating purposes has been unchanged during 1994 at a level of 1 Mtons. The production in the cogeneration plants has been constant, but has increased for electricity production. The minor plants have increased their use of forest fuels. The use of steam coal will probably go down in the next years both for heat and cogeneration plants. During the top year 1987 coal was used in 18 hot water and 11 cogeneration plants. 1994 these figures are 3 and 12. Taxes and environmental reasons explain this trend. The use of steam coal in industry has been constant at the level 0.7 Mtons. The import of metallurgical coal in 1993 was 1.6 Mtons, like 1992. Import of 0.3 Mtons of coke gives the total consumption of coke in industry as 1.5 Mtons. the average price of steam coal imported to Sweden was 317 SEK/ton, 3% higher than 1993. All Swedish plants meet their emission limit of dust, SO 2 and NO x as given by county administrations or concession boards. The cogeneration plants all have some SO 2 removal system. The biggest cogeneration plant (Vaesteraas) has recently invested in a SCR NO x cleaning system. Most other plants use low NO x burners or SNR injection systems based on ammonia or urea. 2 figs, 13 tabs

  8. Results from trialling aqueous NH{sub 3} based post combustion capture in a pilot plant at Munmorah power station. Desorption

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Hai; Morgan, Scott; Allport, Andrew; Cottrell, Aaron; Do, Thong; McGregor, James; Wardhaugh, Leigh; Feron, Paul [CSIRO Energy Centre, Mayfield West, NSW (Australia)

    2013-07-01

    Australia's Commonwealth Scientific and Industrial Research Organization (CSIRO) and Delta Electricity have tested an aqueous ammonia based post combustion capture (PCC) process in a pilot plant at Munmorah black coal fired power station. This paper presents and discusses the experimental results obtained and primarily focuses on the desorption section. A high purity of CO{sub 2} product was obtained at the stripper gas outlet with the CO{sub 2} volumetric concentration generally between 99-100% and the remainder being water and NH{sub 3}. An increase in stripper pressure/temperature can lead to a decrease in NH{sub 3} concentration in the CO{sub 2} product. The NH{sub 3} concentration can be controlled within 200 ppm without wash at a stripper pressure of 850 kPa (the maximum pressure tested) at a stripper gas outlet temperatures of 20-25 C. The solid precipitation occurred in the stripper condenser and reflux lines. Due to the low ammonia content in the solution, CO{sub 2} content in the solution was low and generally more than 50% of regeneration energy was used to heat up the solvent under the pilot plant conditions. The lowest regeneration energy obtained from the pilot plant trials is 4-4.2 MJ/kg CO{sub 2} captured. The effect of various parameters including solvent flow-rate and stripper temperature/pressure in the solvent on the regeneration energy was investigated.

  9. RESEARCH ON CARBON PRODUCTS FROM COAL USING AN EXTRACTIVE PROCESS

    Energy Technology Data Exchange (ETDEWEB)

    Peter G. Stansberry; Alfred H. Stiller; John W. Zondlo; Chong Chen; Brian Bland; David Fenton

    2002-03-31

    This report presents the results of a one-year effort directed at the exploration of the use of coal as a feedstock for a variety of industrially-relevant carbon products. The work was basically divided into three focus areas. The first area dealt with the acquisition of laboratory equipment to aid in the analysis and characterization of both the raw coal and the coal-derived feedstocks. Improvements were also made on the coal-extraction pilot plant which will now allow larger quantities of feedstock to be produced. Mass and energy balances were also performed on the pilot plant in an attempt to evaluate the scale-up potential of the process. The second focus area dealt with exploring hydrogenation conditions specifically aimed at testing several less-expensive candidate hydrogen-donor solvents. Through a process of filtration and vacuum distillation, viable pitch products were produced and evaluated. Moreover, a recycle solvent was also isolated so that the overall solvent balance in the system could be maintained. The effect of variables such as gas pressure and gas atmosphere were evaluated. The pitch product was analyzed and showed low ash content, reasonable yield, good coking value and a coke with anisotropic optical texture. A unique plot of coke yield vs. pitch softening point was discovered to be independent of reaction conditions or hydrogen-donor solvent. The third area of research centered on the investigation of alternate extraction solvents and processing conditions for the solvent extraction step. A wide variety of solvents, co-solvents and enhancement additives were tested with varying degrees of success. For the extraction of raw coal, the efficacy of the alternate solvents when compared to the benchmark solvent, N-methyl pyrrolidone, was not good. However when the same coal was partially hydrogenated prior to solvent extraction, all solvents showed excellent results even for extractions performed at room temperature. Standard analyses of the

  10. Status of health and environmental research relative to coal gasification 1976 to the present

    Energy Technology Data Exchange (ETDEWEB)

    Wilzbach, K.E.; Reilly, C.A. Jr. (comps.)

    1982-10-01

    Health and environmental research relative to coal gasification conducted by Argonne National Laboratory, the Inhalation Toxicology Research Institute, and Oak Ridge National Laboratory under DOE sponsorship is summarized. The studies have focused on the chemical and toxicological characterization of materials from a range of process streams in five bench-scale, pilot-plant and industrial gasifiers. They also address ecological effects, industrial hygiene, environmental control technology performance, and risk assessment. Following an overview of coal gasification technology and related environmental concerns, integrated summaries of the studies and results in each area are presented and conclusions are drawn. Needed health and environmental research relative to coal gasification is identified.

  11. Comparison of electricity production costs of nuclear and coal-fired power plants

    International Nuclear Information System (INIS)

    Peltzer, M.

    1980-01-01

    Electricity production costs of nuclear and coal-fired power plants their structure and future development are calculated and compared. Assumed beginning of operation is in the mid-1980. The technical and economical data are based on a nuclear power unit of 1 300 MW and on a coal-fired twin plant of 2 x 750 MW. The study describes and discusses the calculational method and the results. The costs for the electricity generation show an economic advantage for nuclear power. A sensitivity analysis shows that these results are valid also for changed input parameters. (orig.) [de

  12. Technico-economic evaluation of abatement systems applying to air pollution resulting from coal-fired power plants

    International Nuclear Information System (INIS)

    Mounier, Marc.

    1981-09-01

    The aim of this study is to contribute to the analysis of the health care policies which could be considered in coal-fired power plants, in the comparative framework of the radiation protection in nuclear power plants. After a recall of the typical parameters of the air pollution due to the normal operation of a coal-fired power plant, we develop a heuristic model which allows, after having quantified the releases, to determine the theoretical health effects associated to a one-year operation of the power plant. The comparison of the various protection policies has been done with the help of a cost-effectiveness analysis. An examination of the results shows that the policy presently implemented forms a part of the cost-effective options. Nevertheless, it can be seen that the marginal protection cost is higher in nuclear power plants than in coal-fired power plants [fr

  13. Economic competitiveness of small modular reactors versus coal and combined cycle plants

    International Nuclear Information System (INIS)

    Alonso, Gustavo; Bilbao, Sama; Valle, Edmundo del

    2016-01-01

    Small modular reactors (SMRs) may be an option to cover the electricity needs of isolated regions, distributed generation grids and countries with small electrical grids. Previous analyses show that the overnight capital cost for SMRs is between 4500 US$/kW and 5350 US$/kW, which is between a 6% and a 26% higher than the average cost of a current large nuclear reactor. This study analyzes the economic competitiveness of small modular reactors against thermal plants using coal and natural gas combined cycle plants. To assess the economic competitiveness of SMRs, three overnight capital costs are considered 4500 US$/kW, 5000 US$/kW and 5350 US$/kW along with three discount rates for each overnight cost considered, these are 3, 7, and 10%. To compare with natural gas combined cycle (CC) units, four different gas prices are considered, these are 4.74 US$/GJ (5 US$/mmBTU), 9.48 US$/GJ (10 US$/mmBTU), 14.22 US$/GJ (15 US$/mmBTU), and 18.96 US$/GJ (20 US$/mmBTU). To compare against coal, two different coal prices are considered 80 and 120 US$/ton of coal. The carbon tax considered, for both CC and coal, is 30 US$/ton CO_2. The results show what scenarios make SMRs competitive against coal and/or combined cycle plants. In addition, because the price of electricity is a key component to guarantee the feasibility of a new project, this analysis calculates the price of electricity for the economically viable deployment of SMRs in all the above scenarios. In particular, this study shows that a minimum price of electricity of 175 US$/MWh is needed to guarantee the feasibility of a new SMR, if its overnight capital cost is 5350 US$/kWe and the discount rate is 10%. Another result is that when the price of electricity is around 100 US$/MWh then the discount rate must be around 7% or less to provide appropriate financial conditions to make SMRs economically feasible. - Highlights: • Small modular reactor (SMR) are economically assessed. • SMR are compared against gas and coal

  14. Soil as an archive of coal-fired power plant mercury deposition.

    Science.gov (United States)

    Rodríguez Martín, José Antonio; Nanos, Nikos

    2016-05-05

    Mercury pollution is a global environmental problem that has serious implications for human health. One of the most important sources of anthropogenic mercury emissions are coal-burning power plants. Hg accumulations in soil are associated with their atmospheric deposition. Our study provides the first assessment of soil Hg on the entire Spanish surface obtained from one sampling protocol. Hg spatial distribution was analysed with topsoil samples taken from 4000 locations in a regular sampling grid. The other aim was to use geostatistical techniques to verify the extent of soil contamination by Hg and to evaluate presumed Hg enrichment near the seven Spanish power plants with installed capacity above 1000 MW. The Hg concentration in Spanish soil fell within the range of 1-7564 μg kg(-1) (mean 67.2) and 50% of the samples had a concentration below 37 μg kg(-1). Evidence for human activity was found near all the coal-fired power plants, which reflects that metals have accumulated in the basin over many years. Values over 1000 μg kg(-1) have been found in soils in the vicinity of the Aboño, Soto de Ribera and Castellon power plants. However, soil Hg enrichment was detectable only close to the emission source, within an approximate range of only 15 km from the power plants. We associated this effect with airborne emissions and subsequent depositions as the potential distance through fly ash deposition. Hg associated with particles of ash tends to be deposited near coal combustion sources. Copyright © 2016 Elsevier B.V. All rights reserved.

  15. Study of boron behaviour in two Spanish coal combustion power plants.

    Science.gov (United States)

    Ochoa-González, Raquel; Cuesta, Aida Fuente; Córdoba, Patricia; Díaz-Somoano, Mercedes; Font, Oriol; López-Antón, M Antonia; Querol, Xavier; Martínez-Tarazona, M Rosa; Giménez, Antonio

    2011-10-01

    A full-scale field study was carried out at two Spanish coal-fired power plants equipped with electrostatic precipitator (ESP) and wet flue gas desulfurisation (FGD) systems to investigate the distribution of boron in coals, solid by-products, wastewater streams and flue gases. The results were obtained from the simultaneous sampling of solid, liquid and gaseous streams and their subsequent analysis in two different laboratories for purposes of comparison. Although the final aim of this study was to evaluate the partitioning of boron in a (co-)combustion power plant, special attention was paid to the analytical procedure for boron determination. A sample preparation procedure was optimised for coal and combustion by-products to overcome some specific shortcomings of the currently used acid digestion methods. In addition boron mass balances and removal efficiencies in ESP and FGD devices were calculated. Mass balance closures between 83 and 149% were obtained. During coal combustion, 95% of the incoming boron was collected in the fly ashes. The use of petroleum coke as co-combustible produced a decrease in the removal efficiency of the ESP (87%). Nevertheless, more than 90% of the remaining gaseous boron was eliminated via the FGD in the wastewater discharged from the scrubber, thereby causing environmental problems. Copyright © 2011 Elsevier Ltd. All rights reserved.

  16. Compressed air storage with humidification (CASH) coal gasification power plant investigation

    International Nuclear Information System (INIS)

    Nakhamkin, M.; Patel, M.

    1991-08-01

    A study was performed to investigate and develop a hybrid coal gasification concept which utilizes an air saturator (AS) with an integrated coal gasification/compressed air energy storage (CGS/CAES) plant. This potentially attractive concept is designated as AS/CGS/CAES. In this concept, the coal gasification system provides fuel for the combustors of the CAES reheat turbomachinery train. Motive air from underground storage is humidified by saturators and thereby provides increased power production without additional air consumption. The heat for generating the hot water utilized in the saturators is extracted from waste heat within the overall plant. Multiple alternatives were considered and parametrically analyzed in the study in order to select the most thermodynamically and economically attractive concepts. The major alternatives were differentiated by the type of gasifier, type of CAES turbomachinery, mode of operation, and utilization of waste heat. The results of the study indicate that the use of the air saturation in AS/CGS/CAES plants might reduce capital costs of coal gasification based power used in intermediate load generation by $300 to $400 per kilowatt. Furthermore, heat rates might also be reduced by almost 1.5 cents per kilowatt hour, a major reduction. The major cause of the reduction in electricity costs is a 50% reduction in the required gasification capacity per net kW. In addition to being a load management tool, AS/CGS/CAES concepts provide a method to operate the CGS and turbomachinery in a continuous mode, improving the operation and potentially the life expectancy of both components. 3 refs., 18 figs., 4 tabs

  17. Exotic plant species attack revegetation plants in post-coal mining areas

    Science.gov (United States)

    Yusuf, Muhammad; Arisoesilaningsih, Endang

    2017-11-01

    This study aimed to explore some invasive exotic plant species that have the potential to disrupt the growth of revegetation plants in post-coal mining areas. This research was conducted in a revegetation area of PT, Amanah Anugerah Adi Mulia (A3M) Kintap site, South Borneo. Direct observation was carried out on some revegetation areas by observing the growth of revegetation plants disturbed by exotic plant species and the spread of exotic plant species. Based on observation, several invasive exotic plant species were identified including Mikania cordata, Centrosema pubescence, Calopogonium mucunoides, Mimosa pudica, Ageratum conyzoides, and Chromolaena odorata. These five plant species grew wild in the revegetation area and showed ability to disrupt the growth of other plants. In some tree species, such as Acacia mangium, Paraserianthes falcataria, M. cordata could inhibit the growth and even kill the trees through covering the tree canopy. So, the trees could not receive optimum sun light for photosynthesis processes. M. cordata was also observed to have the most widespread distribution. Several exotic plant species such as C. mucunoides, M. pudica, and A. conyzoides were observed to have deep root systems compared with plant species used for revegetation. This growth characteristic allowed exotic plant species to win the competition for nutrient absorption with other plant species.

  18. Development of coal partial hydropyrolysis process

    Energy Technology Data Exchange (ETDEWEB)

    Hideaki Yabe; Takafumi Kawamura; Kohichiroh Gotoh; Akemitsu Akimoto [Nippon Steel Corporation, Chiba (Japan)

    2005-07-01

    Coal partial hydropyrolysis process aims at co-production of high yield of light oil such as BTX and naphthalene and synthesis gas from a low rank coal under a mild hydropyrolysis condition. The characteristic of this process is in the two-staged entrained hydropyrolysis reactor composed of the reformer and gasifier. This reactor arrangement gives us high heat efficiency of this process. So far, in order to evaluate the process concept a small-scale basic experiment and a 1t/day process development unit study were carried out. The experimental results showed that coal volatiles were partially hydrogenated to increase the light oil and hydrocarbon gases at the condition of partial hydropyrolysis such as pressure of 2-3MPa, temperature of 700-900{sup o}C and hydrogen concentration of 30-50%. This process has a possibility of producing efficiently and economically liquid and gas products as chemicals and fuel for power generation. As a further development in the period of 2003 to 2008, a 20t/day pilot plant study named ECOPRO (efficient co-production with coal flash hydropyrolysis technology) has been started to establish the process technologies for commercialization. 12 refs., 6 figs., 3 tabs.

  19. Radiological Impact Study of the Coal-Fired Power Plant of Narcea

    Energy Technology Data Exchange (ETDEWEB)

    Robles, B.; Baeza, A.; Mora, J. a.; Corbacho, J. a.; Trueba, C.; Guillen, J.; Rodriguez, Miralles, Y.

    2014-04-01

    Coal, fuel used in thermal power plants for electricity production, contains variable concentrations of naturally occurring radionuclides from natural disintegration series of {sup 2}38U, {sup 2}35U, {sup 2}32Th and also the 40K, which are enhanced in the wastes and coproducts due to the industrial process. For this reason, natural radionuclides which are part of the noncombustible fraction of coal, except those volatiles which incorporate directly to the flue gases, concentrates and are partitioned between fly ashes and bottom ashes. This enhancement could cause, to the workers of the installation and to members of the public around the plant, an increase in the exposure which should be assessed under the radiation protection point of view. Present report collect the results obtained from a screening assessment of the radiological impact derived from the normal operation of the Narcea coal-fired power plant. The project where this assessment was performed is part of a bigger project which is jointly developed by the Unit of Radiation Protection of the Public and the Environment (UPRPYMA) of CIEMAT and the Environmental Radioactivity Laboratory of the Extremadura University (LARUEX) in agreement with the Spanish Association of the Electrical Industry (ENUSA). (Author)

  20. Demonstration of a 100-kWth high-temperature solar thermochemical reactor pilot plant for ZnO dissociation

    Science.gov (United States)

    Koepf, E.; Villasmil, W.; Meier, A.

    2016-05-01

    Solar thermochemical H2O and CO2 splitting is a viable pathway towards sustainable and large-scale production of synthetic fuels. A reactor pilot plant for the solar-driven thermal dissociation of ZnO into metallic Zn has been successfully developed at the Paul Scherrer Institute (PSI). Promising experimental results from the 100-kWth ZnO pilot plant were obtained in 2014 during two prolonged experimental campaigns in a high flux solar simulator at PSI and a 1-MW solar furnace in Odeillo, France. Between March and June the pilot plant was mounted in the solar simulator and in-situ flow-visualization experiments were conducted in order to prevent particle-laden fluid flows near the window from attenuating transparency by blocking incoming radiation. Window flow patterns were successfully characterized, and it was demonstrated that particle transport could be controlled and suppressed completely. These results enabled the successful operation of the reactor between August and October when on-sun experiments were conducted in the solar furnace in order to demonstrate the pilot plant technology and characterize its performance. The reactor was operated for over 97 hours at temperatures as high as 2064 K; over 28 kg of ZnO was dissociated at reaction rates as high as 28 g/min.

  1. Guidebook on design, construction and operation of pilot plants for uranium ore processing

    International Nuclear Information System (INIS)

    1990-01-01

    The design, construction and operation of a pilot plant are often important stages in the development of a project for the production of uranium concentrates. Since building and operating a pilot plant is very costly and may not always be required, it is important that such a plant be built only after several prerequisites have been met. The main purpose of this guidebook is to discuss the objectives of a pilot plant and its proper role in the overall project. Given the wide range of conditions under which a pilot plant may be designed and operated, it is not possible to provide specific details. Instead, this book discusses the rationale for a pilot plant and provides guidelines with suggested solutions for a variety of problems that may be encountered. This guidebook is part of a series of Technical Reports on uranium ore processing being prepared by the IAEA's Division of Nuclear Fuel Cycle and Waste Management. 42 refs, 7 figs, 3 tabs

  2. Optimization of design and operating parameters in a pilot scale Jameson cell for slime coal cleaning

    Energy Technology Data Exchange (ETDEWEB)

    Hacifazlioglu, Hasan; Toroglu, Ihsan [Department of Mining Engineering, University of Karaelmas, 67100 (Turkey)

    2007-07-15

    The Jameson flotation cell has been commonly used to treat a variety of ores (lead, zinc, copper etc.), coal and industrial minerals at commercial scale since 1989. It is especially known to be highly efficient at fine and ultrafine coal recovery. However, although the Jameson cell has quite a simple structure, it may be largely inefficient if the design and operating parameters chosen are not appropriate. In this study, the design and operating parameters of a pilot scale Jameson cell were optimized to obtain a desired metallurgical performance in the slime coal flotation. The optimized design parameters are the nozzle type, the height of the nozzle above the pulp level, the downcomer diameter and the immersion depth of the downcomer. Among the operating parameters optimized are the collector dosage, the frother dosage, the percentage of solids and the froth height. In the optimum conditions, a clean coal with an ash content of 14.90% was obtained from the sample slime having 45.30% ash with a combustible recovery of 74.20%. In addition, a new type nozzle was developed for the Jameson cell, which led to an increase of about 9% in the combustible recovery value.

  3. Implications of environmental regulation and coal plant retirements in systems with large scale penetration of wind power

    International Nuclear Information System (INIS)

    Rahmani, Mohsen; Jaramillo, Paulina; Hug, Gabriela

    2016-01-01

    Over the last decade there have been a growing number of federal and state regulations aimed at controlling air emissions at power plants and/or increasing the penetration of renewable resources in the grid. Environmental Protection Agency regulations will likely lead to the retrofit, retirement, or replacement of coal-fired power plants while the state Renewable Portfolio Standards will continue to drive large-scale deployment of renewable energy sources, primarily wind. Combined, these changes in the generation fleet could have profound implications for the operations of the power system. In this paper, we aim to better understand the interaction between coal plant retirements and increased levels of wind power. We extensively analyze the operations of the PJM electricity system under a broad set of scenarios that include varying levels of wind penetration and coal plant retirements. Not surprisingly, we find that without transmission upgrades, retirement of coal-fired power plants will likely result in considerable transmission congestion and higher energy prices. Increased wind penetration, with high geographic diversity, could mitigate some of the negative effects of coal plant retirement and lead to a significant reduction in air emissions, but wind forecast error might impose operational constraints on the system at times of peak load. - Highlights: •Retirement of coal plants may increase transmission congestion and LMP prices. •EPA rules might lead to significant reductions in emission of air pollutants. •Wind geographical diversity may reduce transmission constraints and air emissions. •At times of high peak load, wind may not reduce system stress caused by retirement. •RPS policies can support and mitigate negative impacts of EPA regulations.

  4. Selection experiments for the optimum combination of AMF-plant-substrate for the restoration of coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Li-ping Wang; Wei-wei Zhang; Guang-xia Guo; Kui-mei Qian; Xiao-pei Huang [China University of Mining & Technology, Xuzhou (China). School of Environment and Spatial Informatics

    2009-07-15

    A complex substrate consisting of fly ash, coal gangue and excess sludge was used as an experimental soil in pot culture experiments. Different soil compositions were tested by observing the growth of arbuscular mycorrhizal (AM) fungi inoculated white clover, rye grass or corn. The biomass of the host plants, the mycorrhizal colonization (MC) rate and the mycorrhizal dependency (MD) were measured. The research addresses the preferable AMF-plant-substrate combination appropriate for restoration of coal mines. We used two inoculation methods: single-inoculation with Glomus versiforme or Glomus mosseae and a dual inoculation with both G.v and G.m. The results show that G.m is the preferable fungi and that dual inoculation does not show advantages for the restoration of coal mines. White clover inoculated with AM fungi is the most suitable condition for restoration of coal mines. The best weight ratio of fly ash, coal gangue and excess sludge was found to be 20:60:20. The optimum treatment conditions of AMF-plant-activated-substrate are described. 10 refs., 2 figs., 4 tabs.

  5. Nitrogen Chemistry in Fluidized Bed Combustion of Coal

    DEFF Research Database (Denmark)

    Jensen, Anker Degn

    and reduction by homogeneous and heterogeneous reactions. The data for the estimation of kinetics of the heterogeneous reactions were measured by one of the partners in the project for char and bed material sampled from a pressurized FBC pilot plant burning Kiveton Park coal. Experimental data from the pilot...... plant were used for model verification. The simulations of the NO emission during staged combustion and NH3 injection for NO reduction were in qualitative agreement with the experimental data. A parametric study of the influence of operating conditions on the conversion of fuel-N to NO showed......, the gas interchange coefficient, the bubble size and the bubble rise velocity. The most important combustion parameters were the rate of CO and CH4 combustion and the fraction of CO produced from char combustion. By using a rate of production analysis, the important reactions in the NO model were...

  6. Scrubbing system design for CO2 capture in coal-fired power plants

    International Nuclear Information System (INIS)

    Heischkamp, Elizabeth

    2017-01-01

    Within the last decades a continuous tightening of environmental regulations has been observed in several countries around the world. These include restriction of anthropogenic CO 2 emissions, since they are considered responsible for intensifying global warming. Coal-fired power plants represent a good possibility for capturing CO 2 before it is emitted in the atmosphere, thereby contributing to combat global warming. This work focuses on reducing the CO 2 emissions of such a power plant by 90 %. For this purpose a hard coal power plant is retrofitted with a chemical absorption using different solutions of piperazine promoted potassium carbonate. The resulting power plant's efficiency losses have been accounted for. A comparison of different scenarios such as the variation of operating parameters offer an insight in detecting suitable operating conditions that will allow to minimize efficiency penalties. Simulation details are provided along with a technical and an economic analysis.

  7. Understanding selected trace elements behavior in a coal-fired power plant in Malaysia for assessment of abatement technologies.

    Science.gov (United States)

    Mokhtar, Mutahharah M; Taib, Rozainee M; Hassim, Mimi H

    2014-08-01

    The Proposed New Environmental Quality (Clean Air) Regulation 201X (Draft), which replaces the Malaysia Environmental Quality (Clean Air) 1978, specifies limits to additional pollutants from power generation using fossil fuel. The new pollutants include Hg, HCl, and HF with limits of 0.03, 100, and 15 mg/N-m3 at 6% O2, respectively. These pollutants are normally present in very small concentrations (known as trace elements [TEs]), and hence are often neglected in environmental air quality monitoring in Malaysia. Following the enactment of the new regulation, it is now imperative to understand the TEs behavior and to assess the capability of the existing abatement technologies to comply with the new emission limits. This paper presents the comparison of TEs behavior of the most volatile (Hg, Cl, F) and less volatile (As, Be, Cd, Cr, Ni, Se, Pb) elements in subbituminous and bituminous coal and coal combustion products (CCP) (i.e., fly ash and bottom ash) from separate firing of subbituminous and bituminous coal in a coal-fired power plant in Malaysia. The effect of air pollution control devices configuration in removal of TEs was also investigated to evaluate the effectiveness of abatement technologies used in the plant. This study showed that subbituminous and bituminous coals and their CCPs have different TEs behavior. It is speculated that ash content could be a factor for such diverse behavior In addition, the type of coal and the concentrations of TEs in feed coal were to some extent influenced by the emission of TEs in flue gas. The electrostatic precipitator (ESP) and seawater flue gas desulfurization (FGD) used in the studied coal-fired power plant were found effective in removing TEs in particulate and vapor form, respectively, as well as complying with the new specified emission limits. Implications: Coals used by power plants in Peninsular Malaysia come from the same supplier (Tenaga Nasional Berhad Fuel Services), which is a subsidiary of the Malaysia

  8. Radioactivity level of soil around Baqiao coal-fired power plant in China

    International Nuclear Information System (INIS)

    Lu, Xinwei; Zhao, Caifeng; Chen, Cancan; Liu, Wen

    2012-01-01

    Natural radioactivity level of soil around Baqiao coal-fired power plant in China was determined using gamma ray spectrometry. The concentrations of 226 Ra, 232 Th and 40 K in the studied soil samples range from 27.6 to 48.8, 44.4 to 61.4 and 640.2 to 992.2 Bq kg −1 with an average of 36.1, 51.1 and 733.9 Bq kg −1 , respectively, which are slightly higher than the average values of Shaanxi soil. The radium equivalent activity, the air absorbed dose rate and the annual effective dose rate were calculated and compared with the internationally reported or reference values. The radium equivalent activities of the studied samples are below the internationally accepted values. The air absorbed dose rate and the annual effective dose rate received by the local residents due to the natural radionuclides in soil are slightly higher than the mean value of Xi'an and worldwide. - Highlights: ► Natural radioactivity in soil around the coal-fired power plant was determined. ► Radiological parameters were used to assess radiation hazard. ► The coal-fired power plant has affected the local radioactivity level.

  9. Proceedings of the Joint Meeting of The Fuel Society of Japan (1991). 28th Coal Science Conference/91st Coke Meeting; (Sha) nenryo kyokai godo taikai happyo ronbunshu (1991). Dai 28 kai sekitan kagaku kaigi dai 91 kai cokes tokubetsukai

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-07

    Relating to coke, studies are made on the rapid coke production method, oven investigation during carbonization, and operational management/control. As to coal science, studies are mainly on the brown coal two-stage liquefaction (BCL) method, and data on the pilot plant and PSU are reported. Concerning bituminous coal liquefaction, PSU data mostly including the NEDOL process, and characteristics of liquefaction residue and its effective utilization by thermal decomposition are reported. Regarding the liquefaction mechanism, an experimentally extensive study on catalyst, solvent and reaction conditions is made using model materials and coal itself on the bench scale and also in the pilot plant. Engineering subjects on residue, solvent deashing, scale attachment and coprocessing are also reported. Relations of decomposition process to coal chemical structure changes and reaction conditions are investigated. As to coal gasification, studies, which are not many, are conducted on material balance, heat balance, and image characteristics of char for gasification and factors controlling reactivity.

  10. Improving energy efficiency of cyclone circuits in coal beneficiation plants by pump-storage systems

    International Nuclear Information System (INIS)

    Zhang, Lijun; Xia, Xiaohua; Zhang, Jiangfeng

    2014-01-01

    Highlights: • A pump-storage system (PSS) is introduced in a coal washing plant to reduce energy consumption and cost. • Optimal operation of the PSS under TOU tariff is formulated and solved. Life cycle cost analysis of the design is done. • Simulation results show the effectiveness of energy efficiency improvement and load shifting effect of the proposed approach. • An annual 38% reduction of overall cost of the coal washing plant with 2.86 years payback period is achieved. • Capacity improvement of power plants contracted to the coal mine is expected as less electricity is required to get fuel. - Abstract: A pump storage system (PSS) is introduced to the coal preparation dense medium cyclone (DMC) plants to improve their energy efficiency while maintaining the required medium supply. The DMC processes are very energy intensive and inefficient because the medium supply pumps are constantly over-pumping. The PSS presented is to reduce energy consumption and cost by introducing an addition medium circulation loop. The corresponding pump operation optimization problem in the PSS scheme under time-based electricity tariff is formulated and solved, based on which the financial benefits of the design is investigated using life cycle cost analysis. A case study based on the operation status of a South African coal mine is carried out to verify the effectiveness of the proposed approach. It is demonstrated that the energy cost can be reduced by more than 50% in the studied case by introducing a 160 m 3 storage tank. According to life cycle analysis, the PSS Option 1 yields an annual 38% reduction of the overall cost for the beneficiation plant with a payback period of 2.68 years

  11. Meditation on the construction of exemplar plant for briquetted coal gasification

    Energy Technology Data Exchange (ETDEWEB)

    Zhou Kuiyi [China National Coal Industry Import and Export Corporation, Beijing (China)

    1997-12-31

    China uses a considerable amount of anthracite, but the fines from anthracite mining are not sufficiently used. This project involved the construction of a plant for the manufacture of anthracite briquettes under high pressure, for use in gasification plants. The characteristics of the coals used and the types of briquette formed are described. 2 tabs.

  12. Coal - 97

    International Nuclear Information System (INIS)

    Sparre, C.

    1997-01-01

    The report deals with the use of coal and coke during 1996. Some information about techniques, environmental questions and markets are also given. Data have been collected by questionnaires to major users and by telephone to minor users. Preliminary statistical data from SCB have also been used. The use of steam coal for heating purposes during 1996 was 1,2 mill tons and 50% higher than in 1995. The increase is probably temporary and due to high prices of electricity because of lack of water power. The co-generation plants were the main users of coal. The minor plants have increased their use of forest fuels. Probably the use of steam coal will go down in the immediate years both in the heat generating and the co-generation plants. During the top year 1987 coal was used in 18 hotwater plants and 11 co-generation plants. 1996 these figures are 3 and 12. Taxes and environmental reasons explain this trend. The use of steam coal in the industry has been constant at the level 700 000 tons. This level is supposed to be constant or to vary with business cycles. The import of metallurgical coal in 1996 was 1,6 mill tons like the year before. 1,2 mill tons coke were produced. The coke consumption in the industry was 1,5 mill tons. 0,3 mill tons of coke were imported. The average price of steam coal imported in Sweden in 1996 was 340 SEK/ton or 2% higher than in 1995. For the world, the average import price was 51,5 USD/ton, nearly the same as the year before. The contract prices for delivery during 1997 are about equal as the end of 1996. All Swedish plants meet their emission limits of dust, SO 2 and NO x given by county administrations or concession boards

  13. Optimisation of a wet FGD pilot plant using fine limestone and organic acids

    DEFF Research Database (Denmark)

    Frandsen, Jan; Kiil, Søren; Johnsson, Jan Erik

    2001-01-01

    , but the residual limestone content in the gypsum increased to somewhere between 19 and 30 wt%, making this pH range unsuitable for use in a full-scale plant. The investigations have shown that both the addition of organic acids and the use of a limestone with a fine PSD can be used to optimise wet FGD plants. (C......The effects of adding an organic acid or using a limestone with a fine particle size distribution (PSD) have been examined in a wet flue gas desulphurisation (FGD) pilot plant. Optimisation of the plant with respect to the degree of desulphurisation and the residual limestone content of the gypsum...... has been the aim of the work. In contrast to earlier investigations with organic acids, all essential process parameters (i.e. gas phase concentration profiles of SO(2), slurry pH profiles. and residual limestone in the gypsum) were considered. Slurry concentrations of adipic acid in the range of 0...

  14. Utilization of brown coal in FRG power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kotler, V.R.

    1985-07-01

    FRG methods are studied for utilizing brown coal in view of the development of Kansk-Achinsk brown coal deposits. The use of brown coal in FRG power plants has increased from 15% in 1950- 1960 to 85% (total output) in 1982, providing 79.4 TWh of electrical energy. The remainder was used for briquetting, pulverization and breeze coke. In 1982 nearly 100 million tons of brown coal were burned by six large power stations (rated capacity 11,400 MW) to produce nearly 80 billion kWh of energy. Measures are discussed taken to reduce slagging and to remove excessive moisture content. Problems are analyzed associated with increased contamination of the atmosphere in areas with high population density (412/km/sup 2/) and cost of suppression is reviewed. According to available data, the cost of preventive measures taken by FRG, USA, Japan and the Netherlands is equal to 30% of the total cost of the energy. The most critical problem is suppression of sulfur dioxide, either by dry or wet scrubbers or by the addition of dry dolomite or lime to the furnace (75% of all SO/sub 2/ emissions in FRG comes from power stations). A method is described developed by RWE based on a series of distribution headers in the upper part of combustion chambers. At best, 70-80% reduction can be achieved. 14 references.

  15. Evaluation of Suitability of Selected Set of Coal Plant Sites for Repowering with Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Belles, Randy [ORNL; Copinger, Donald A [ORNL; Mays, Gary T [ORNL; Omitaomu, Olufemi A [ORNL; Poore III, Willis P [ORNL

    2013-03-01

    This report summarizes the approach that ORNL developed for screening a sample set of small coal stations for possible repowering with SMRs; the methodology employed, including spatial modeling; and initial results for these sample plants. The objective in conducting this type of siting evaluation is to demonstrate the capability to characterize specific sample coal plant sites to identify any particular issues associated with repowering existing coal stations with SMRs using OR-SAGE; it is not intended to be a definitive assessment per se as to the absolute suitability of any particular site.

  16. Coal-Fired Power Plants, Region 9, 2011, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Approximate locations of active coal-fired power plants located in US EPA's Region 9. Emission counts from the 2005 National Emissions Inventory (NEI) are included...

  17. Two-stage liquefaction of a Spanish subbituminous coal

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, M.T.; Fernandez, I.; Benito, A.M.; Cebolla, V.; Miranda, J.L.; Oelert, H.H. (Instituto de Carboquimica, Zaragoza (Spain))

    1993-05-01

    A Spanish subbituminous coal has been processed in two-stage liquefaction in a non-integrated process. The first-stage coal liquefaction has been carried out in a continuous pilot plant in Germany at Clausthal Technical University at 400[degree]C, 20 MPa hydrogen pressure and anthracene oil as solvent. The second-stage coal liquefaction has been performed in continuous operation in a hydroprocessing unit at the Instituto de Carboquimica at 450[degree]C and 10 MPa hydrogen pressure, with two commercial catalysts: Harshaw HT-400E (Co-Mo/Al[sub 2]O[sub 3]) and HT-500E (Ni-Mo/Al[sub 2]O[sub 3]). The total conversion for the first-stage coal liquefaction was 75.41 wt% (coal d.a.f.), being 3.79 wt% gases, 2.58 wt% primary condensate and 69.04 wt% heavy liquids. The heteroatoms removal for the second-stage liquefaction was 97-99 wt% of S, 85-87 wt% of N and 93-100 wt% of O. The hydroprocessed liquids have about 70% of compounds with boiling point below 350[degree]C, and meet the sulphur and nitrogen specifications for refinery feedstocks. Liquids from two-stage coal liquefaction have been distilled, and the naphtha, kerosene and diesel fractions obtained have been characterized. 39 refs., 3 figs., 8 tabs.

  18. Phyto-bioconversion of hard coal in the Cynodon dactylon/coal rhizosphere.

    Science.gov (United States)

    Igbinigie, Eric E; Mutambanengwe, Cecil C Z; Rose, Peter D

    2010-03-01

    Fundamental processes involved in the microbial degradation of coal and its derivatives have been well documented. A mutualistic interaction between plant roots and certain microorganisms to aid growth of plants such as Cynodon dactylon (Bermuda grass) on hard coal dumps has recently been suggested. In the present study coal bioconversion activity of nonmycorrhizal fungi was investigated in the C. dactylon/coal rhizosphere. Fungal growth on 2% Duff-agar, gutation formation on nitric acid treated coal and submerged culture activity in nitrogen-rich and -deficient broth formed part of the screening and selection of the fungi. The selected fungal isolates were confirmed to be found in pristine C. dactylon/coal rhizosphere. To simulate bioconversion, a fungal aliquot of this rhizosphere was used as inoculum for a Perfusate fixed bed bioreactor, packed with coal. The results demonstrate an enhanced coal bioconversion facilitated by low molecular weight organics and the bioconversion of coal may be initiated by an introduction of nitrogen moieties to the coal substrate. These findings suggest a phyto-bioconversion of hard coal involving plant and microbes occurring in the rhizosphere to promote the growth of C. dactylon. An understanding of this relationship can serve as a benchmark for coal dumps rehabilitation as well as for the industrial scale bioprocessing of hard coal.

  19. Plant concept of heat utilization of high temperature gas-cooled reactors. Co-generation and coal-gasification

    International Nuclear Information System (INIS)

    Tonogouchi, M.; Maeda, S.; Ide, A.

    1996-01-01

    In Japan, JAERI is now constructing the High temperature Engineering Test Reactor (HTTR) and the new era is coming for the development and utilization of HTR. Recognizing that the heat utilization of HTR would mitigate problems of environment and resources and contribute the effective use and steady supply of the energy, FAPIG organized a working group named 'HTR-HUC' to study the heat utilization of HTR in the field other than electric power generation. We chose three kinds of plants to study, 1) a co-generation plant in which the existing power units supplying steam and electricity can be replaced by a nuclear plant, 2) Coal gasification plant which can accelerate the clean use of coal and contribute stable supply of the energy and preservation of the environment in the world and 3) Hydrogen production plant which can help to break off the use of the new energy carrier HYDROGEN and will release people from the dependence of fossil energy. In this paper the former two plants, Co-generation chemical plant and Coal-gasification plant are focussed on. The main features, process flow and safety assessment of these plants are discussed. (J.P.N.)

  20. PAH emissions from coal combustion and waste incineration.

    Science.gov (United States)

    Hsu, Wei Ting; Liu, Mei Chen; Hung, Pao Chen; Chang, Shu Hao; Chang, Moo Been

    2016-11-15

    The characteristics of PAHs that are emitted by a municipal waste incinerator (MWI) and coal-fired power plant are examined via intensive sampling. Results of flue gas sampling reveal the potential for PAH formation within the selective catalytic reduction (SCR) system of a coal-fired power plant. In the large-scale MWI, the removal efficiency of PAHs achieved with the pilot-scaled catalytic filter (CF) exceeds that achieved by activated carbon injection with a bag filter (ACI+BF) owing to the effective destruction of gas-phase contaminants by a catalyst. A significantly lower PAH concentration (1640ng/g) was measured in fly ash from a CF module than from an ACI+BF system (5650ng/g). Replacing the ACI+BF system with CF technology would significantly reduce the discharge factor (including emission and fly ash) of PAHs from 251.6 to 77.8mg/ton-waste. The emission factors of PAHs that are obtained using ACI+BF and the CF system in the MWI are 8.05 and 7.13mg/ton, respectively. However, the emission factor of MWI is significantly higher than that of coal-fired power plant (1.56mg/ton). From the perspective of total environmental management to reduce PAH emissions, replacing the original ACI+BF process with a CF system is expected to reduce environmental impact thereof. Copyright © 2016 Elsevier B.V. All rights reserved.

  1. PM1 particles at coal- and gas-fired power plant work areas.

    Science.gov (United States)

    Hicks, Jeffrey B; McCarthy, Sheila A; Mezei, Gabor; Sayes, Christie M

    2012-03-01

    With the increased interest in the possible adverse health effects attributed to inhalation of fine particle matter, this study was conducted to gather preliminary information about workplace exposures at coal- and gas-fired power plants to fine particles (PM(1); i.e. <1 μm) and ultrafine particles (i.e. <0.1 μm). Combustion of fossil fuel is known to produce fine particles, and due to their proximity and durations of exposure, power plant workers could be a group of individuals who experience high chronic exposures to these types of particles. The results of a series of real-time instrument measurements showed that concentrations of PM(1) were elevated in some locations in power plants. The highest concentrations were in locations near combustion sources, indicating that combustion materials were leaking from conventional fossil fuel-fired boilers or it was associated with emission plume downwash. Concentrations were the lowest inside air-conditioned control rooms where PM(1) were present at levels similar to or lower than upwind concentrations. Microscopic examinations indicate that PM(1) at the coal-fired plants are dominated by vitrified spheres, although there were also unusual elongated particles. Most of the PM(1) were attached to larger coal fly ash particles that may affect where and how they could be deposited in the lung.

  2. Coal-92

    International Nuclear Information System (INIS)

    Hillring, B.; Sparre, C.

    1992-11-01

    Swedish consumption of coal and coke during 1991 and trends in technology, environment and market aspects of coal use are reported. Steam coal use in the heating sector was unchanged from 1991, 1.2 Mtons. Reduced consumption in smaller district heating units (due to conversion to biofuels and gas) was compensated by increased use for power generation in cogeneration plants. Coal consumption in industry fell 0.10 Mton to 0.84 Mton due to lower production in one industry branch. Import of steam coal was 1.1 Mton (down 0.5 Mton from 1990) since new rules for strategic reserves allowed a reduction of stocks. During the last five years stocks have been reduced by 2 Mtons. Import of metallurgical coal was 1.6 Mton, unchanged from 1990. The report also gives statistics for the coal using plants in Sweden, on coal R and D, and on emission laws for coal firing. (9 tabs., 2 figs.)

  3. Development of bricks with incorporation of coal ash and sludge from water treatment plant

    International Nuclear Information System (INIS)

    Silva, Mauro Valerio da

    2011-01-01

    Sludge from treatment water Brazilian plant station are, frequently, disposed and launched directly in the water bodies, causing a negative impact in the environment. Also, coal ashes is produced by burning of coal in coal-fired power stations and is the industrial solid waste most generated in southern Brazil: approximately 4 million tons/y. The efficient disposal of coal ashes is an issue due to its massive volume and harmful risks to the environment. The aim of this work was study the feasibility of incorporating these two industrial wastes in a mass used in the manufacture of ecological bricks. Samples of fly ashes from a cyclone filter from a coal-fired power plant located at Figueira County in Parana State, Brazil and waterworks sludge of Terra Preta County in Sao Paulo State, Brazil, were used in the study. Fly ash-sludge and fly ash-sludge-soil-cement bricks were molded and tested, according to the Brazilians Standards. The materials were characterized by physical-chemical analysis, X-ray diffraction, thermal analysis, morphological analysis, Fourier transform infrared spectroscopy and granulometric analysis. The results indicate that the waterworks sludge and coal ashes have potential to be used on manufacturing soil-cement pressed bricks according to the of Brazilians Standards NBR 10836/94. (author)

  4. Performance analysis and pilot plant test results for the Komorany fluidized bed retrofit project

    Energy Technology Data Exchange (ETDEWEB)

    Snow, G.C. [POWER International, Inc., Coeur d`Alene, ID (United States)

    1995-12-01

    Detailed heat and mass balance calculations and emission performance projections are presented for an atmospheric fluidized bed boiler bottom retrofit at the 927 MWt (steam output) Komorany power station and district heating plant in the Czech Republic. Each of the ten existing boilers are traveling grate stoker units firing a local, low-rank brown coal. This fuel, considered to be representative of much of the coal deposits in Central Europe, is characterized by an average gross calorific value of 10.5 MJ/kg (4,530 Btu/lb), an average dry basis ash content of 47 %, and a maximum dry basis sulfur content of 1.8 % (3.4 % on a dry, ash free basis). The same fuel supply, together with limestone supplied from the region will be utilized in the retrofit fluidized bed boilers. The primary objectives of this retrofit program are, (1) reduce emissions to a level at or below the new Czech Clean Air Act, and (2) restore plant capacity to the original specification. As a result of the AFBC retrofit and plant upgrade, the particulate matter emissions will be reduced by over 98 percent, SO{sub 2} emissions will be reduced by 88 percent, and NO{sub x} emissions will be reduced by 38 percent compared to the present grate-fired configuration. The decrease in SO{sub 2} emissions resulting from the fluidized bed retrofit was initially predicted based on fuel sulfur content, including the distribution among organic, pyritic, and sulfate forms; the ash alkalinity; and the estimated limestone calcium utilization efficiency. The methodology and the results of this prediction were confirmed and extended by pilot scale combustion trials at a 1.0 MWt (fuel input), variable configuration test facility in France.

  5. Plant growth response in experimental soilless mixes prepared from coal combustion products and organic waste materials

    Energy Technology Data Exchange (ETDEWEB)

    Bardhan, S.; Watson, M.; Dick, W.A. [Ohio State University, Wooster, OH (United States)

    2008-07-15

    Large quantities of organic materials such as animal manures, yard trimmings, and biosolids are produced each year. Beneficial use options for them are often limited, and composting has been proposed as a way to better manage these organic materials. Similarly, burning of coal created 125 million tons of coal combustion products (CCP) in the United States in 2006. An estimated 53 million tons of CCP were reused, whereas the remainder was deposited in landfills. By combining CCP and composted organic materials (COM), we were able to create soilless plant growth mixes with physicochemical conditions that can support excellent plant growth. An additional benefit is the conservation of natural raw materials, such as peat, which is generally used for making soilless mixes. Experimental mixes were formulated by combining CCP and COM at ratios ranging from 2:8 to 8:2 (vol/vol), respectively. Water content at saturation for the created mixes was 63% to 72%, whereas for the commercial control, it was 77%. pH values for the best performing mixes ranged between 5.9 and 6.8. Electrical conductivity and concentrations of required plant nutrient were also within plant growth recommendations for container media. Significantly (P < 0.0001) higher plant biomass growth (7%-130%) was observed in the experimental mixes compared with a commercial mix. No additional fertilizers were provided during the experiment, and reduced fertilization costs can thus accrue as an added benefit to the grower. In summary, combining CCP and COM, derived from source materials often viewed as wastes, can create highly productive plant growth mixes.

  6. Achievement report (edition B) for fiscal 1999 on development of technology to manufacture coal gas for fuel cells. Studies by using pilot test facilities (Volumes for equipment fabrication and constructions, and trial run design); 1999 nendo seika hokokusho (B ban). Nenryo denchi you sekitan gas seizo gijutsu kaihatsu - Pilot setsubi ni yoru kenkyu (kisokoji kiki seisaku hen shiunten sekkei hen)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    With an objective to develop a coal gas manufacturing system for fuel cells, research and development has been performed on a oxygen-blown coal gasifier and researches on a technology to purify gases for fuel cells. This paper summarizes the achievements in fiscal 1999. The current fiscal year has performed, among other the pilot plant construction works, execution of the above-the-ground constructions for the operation center and compressor room building, construction of the cooling water tanks, and partial improvement of roads in the plant site. In the gasifier facilities, items of equipment were fabricated, some of the outsourced articles were procured, and the installations thereof were carried out. For the gas purifying equipment, installation of the gas analyzer room was executed. In the trial run design, discussions were given on the systematic improvements in the test items, the gas sampling procedures, the unit protecting interlock, and the facility protecting logic. For the trial run design, establishment has been implemented on the efficient and functional test plans by establishing priority on the tests to be executed, so that the development items demanded in the pilot test and research can be achieved within the limited test processes. (NEDO)

  7. Pilot plant for flue gas treatment - continuous operation tests

    International Nuclear Information System (INIS)

    Chmielewski, A.G.; Tyminski, B.; Iller, E.; Zimek, Z.; Licki, J.; Radzio, B.

    1995-01-01

    Tests of continuous operation have been performed on pilot plant at EPS Kaweczyn in the wide range of SO 2 concentration (500-3000 ppm). The bag filter has been applied for aerosol separation. The high efficiencies of SO 2 and NO x removal, approximately 90% were obtained and influenced by such process parameters as: dose, gas temperature and ammonia stoichiometry. The main apparatus of the pilot plant (e.g. both accelerators) have proved their reliability in hard industrial conditions. (Author)

  8. Solvent refined coal (SRC) process. Quarterly technical progress report, January 1980-March 1980. [In process streams

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    This report summarizes the progress of the Solvent Refined Coal (SRC) project at the SRC Pilot Plant in Fort Lewis, Wahsington, and the Process Development Unit (P-99) in Harmarville, Pennsylvania. After the remaining runs of the slurry preheater survey test program were completed January 14, the Fort Lewis Pilot Plant was shut down to inspect Slurry Preheater B and to insulate the coil for future testing at higher rates of heat flux. Radiographic inspection of the coil showed that the welds at the pressure taps and the immersion thermowells did not meet design specifications. Slurry Preheater A was used during the first 12 days of February while weld repairs and modifications to Slurry Preheater B were completed. Two attempts to complete a material balance run on Powhatan No. 6 Mine coal were attempted but neither was successful. Slurry Preheater B was in service the remainder of the quarter. The start of a series of runs at higher heat flux was delayed because of plugging in both the slurry and the hydrogen flow metering systems. Three baseline runs and three slurry runs of the high heat flux program were completed before the plant was shut down March 12 for repair of the Inert Gas Unit. Attempts to complete a fourth slurry run at high heat flux were unsuccessful because of problems with the coal feed handling and the vortex mix systems. Process Development Unit (P-99) completed three of the four runs designed to study the effect of dissolver L/D ratio. The fourth was under way at the end of the period. SRC yield correlations have been developed that include coal properties as independent variables. A preliminary ranking of coals according to their reactivity in PDU P-99 has been made. Techniques for studying coking phenomenona are now in place.

  9. Operational experiences of (in)direct co-combustion in coal and gas fired power plants in Europe

    International Nuclear Information System (INIS)

    Van Ree, R.; Korbee, R.; Meijer, R.; Konings, T.; Van Aart, F.

    2001-02-01

    The operational experiences of direct and indirect co-combustion of biomass/waste in European coal and natural gas fired power plants are addressed. The operational experiences of mainly Dutch direct co-combustion activities in coal fired power plants are discussed; whereas an overview of European indirect co-combustion activities is presented. The technical, environmental, and economic feasibility of different indirect co-combustion concepts (i.e. upstream gasification, pyrolysis, combustion with steam-side integration) is investigated, and the results are compared with the economic preferable concept of direct co-combustion. Main technical constraints that limit the co-combustion capacity of biomass/waste in conventional coal fired power plants are: the grindability of the biomass/coal blend, the capacity of available unit components, and the danger of severe slagging, fouling, corrosion and erosion. The main environmental constraints that have to be taken into account are the quality of produced solid waste streams (fly ash, bottom ash, gypsum) and the applicable air emission regulations. 6 refs

  10. Coal conversion process by the United Power Plants of Westphalia

    Energy Technology Data Exchange (ETDEWEB)

    1974-08-01

    The coal conversion process used by the United Power Plants of Westphalia and its possible applications are described. In this process, the crushed and predried coal is degassed and partly gasified in a gas generator, during which time the sulfur present in the coal is converted into hydrogen sulfide, which together with the carbon dioxide is subsequently washed out and possibly utilized or marketed. The residual coke together with the ashes and tar is then sent to the melting chamber of the steam generator where the ashes are removed. After desulfurization, the purified gas is fed into an external circuit and/or to a gas turbine for electricity generation. The raw gas from the gas generator can be directly used as fuel in a conventional power plant. The calorific value of the purified gas varies from 3200 to 3500 kcal/cu m. The purified gas can be used as reducing agent, heating gas, as raw material for various chemical processes, or be conveyed via pipelines to remote areas for electricity generation. The conversion process has the advantages of increased economy of electricity generation with desulfurization, of additional gas generation, and, in long-term prospects, of the use of the waste heat from high-temperature nuclear reactors for this process.

  11. Off-design thermodynamic performances on typical days of a 330 MW solar aided coal-fired power plant in China

    International Nuclear Information System (INIS)

    Peng, Shuo; Hong, Hui; Wang, Yanjuan; Wang, Zhaoguo; Jin, Hongguang

    2014-01-01

    Highlights: • Optical loss and heat loss of solar field under different turbine load were investigated. • Off-design thermodynamic feature was disclosed by analyzing several operational parameters. • Possible schemes was proposed to improve the net solar-to-electricity efficiency. - Abstract: The contribution of mid-temperature solar thermal power to improve the performance of coal-fired power plant is analyzed in the present paper. In the solar aided coal-fired power plant, solar heat at <300 °C is used to replace the extracted steam from the steam turbine to heat the feed water. In this way, the steam that was to be extracted could consequently expand in the steam turbine to boost output power. The advantages of a solar aided coal-fired power plant in design condition have been discussed by several researchers. However, thermodynamic performances on off-design operation have not been well discussed until now. In this paper, a typical 330 MW coal-fired power plant in Sinkiang Province of China is selected as the case study to demonstrate the advantages of the solar aided coal-fired power plant under off-design conditions. Hourly thermodynamic performances are analyzed on typical days under partial load. The effects of several operational parameters, such as solar irradiation intensity, incident angle, flow rate of thermal oil, on the performance of solar field efficiency and net solar-to-electricity efficiency were examined. Possible schemes have been proposed for improving the solar aided coal-fired power plant on off-design operation. The results obtained in the current study could provide a promising approach to solve the poor thermodynamic performance of solar thermal power plant and also offer a basis for the practical operation of MW-scale solar aided coal-fired power plant

  12. Recent advances in prediction of emission of hazardous air pollutants from coal-fired power plants

    International Nuclear Information System (INIS)

    Senior, C.L.; Helble, J.J.; Sarofim, A.F.

    2000-01-01

    Coal-fired power plants are a primary source of mercury discharge into the atmosphere along with fine particulates containing arsenic, selenium, cadmium, and other hazardous air pollutants. Information regarding the speciation of these toxic metals is necessary to accurately predict their atmospheric transport and fate in the environment. New predictive tools have been developed to allow utilities to better estimate the emissions of toxic metals from coal-fired power plants. These prediction equations are based on fundamental physics and chemistry and can be applied to a wide variety of fuel types and combustion conditions. The models have significantly improved the ability to predict the emissions of air toxic metals in fine particulate and gas-phase mercury. In this study, the models were successfully tested using measured mercury speciation and mass balance information collected from coal-fired power plants

  13. A soil washing pilot plant for removing petroleum hydrocarbons from contaminated soils

    International Nuclear Information System (INIS)

    Toor, I.A.; Roehrig, G.R.

    1992-01-01

    A soil washing pilot plant was built and tested for its ability to remove petroleum hydrocarbons from certain soils. The ITEX soil washing pilot plant is a trailer mountable mobile unit which has a washing capacity of two tons per hour of contaminated soils. A benchscale study was carried out prior to the fabrication of the pilot plant. The first sample was contaminated with diesel fuel while the second sample was contaminated with crude oil. Various nonionic, cationic and anionic cleaning agents were evaluated for their ability to remove petroleum hydrocarbons from these materials. The nonionic cleaning agents were more successful in cleaning the soils in general. The ultimate surfactant choice was based on several factors including cost, biodegradability, cleaning efficiency and other technical considerations. The soil samples were characterized in terms of their particle size distributions. Commercial diesel fuel was carefully mixed in this sand to prepare a representative sample for the pilot plant study. Two pilot runs were made using this material. A multistage washing study was also conducted in the laboratory which indicates that the contamination level can be reduced to 100 ppm using only four stages. Because the pilot plant washing efficiency is twice as high, it is believed that ultimate contamination levels can be reduced to lower levels using the same number of stages. However, this hypothesis has not been demonstrated to date

  14. Coal waste slurries as a fuel for integrated gasification combined cycle plants

    Directory of Open Access Journals (Sweden)

    Lutynski Marcin A.

    2016-01-01

    Full Text Available The article summarizes recent development in integrated gasification combined cycle technology and lists existing and planned IGCC plants. A brief outlook on the IGCC gasification technology is given with focus on entrained-flow gasifiers where the low-quality coal waste slurry fuel can be used. Desired properties of coal and ash for entrained-flow gasifiers are listed. The coal waste slurries, which were deposited at impoundments in Upper Silesian Coal Basin, were considered as a direct feed for such gasifiers. The average ash content, moisture content and lower heating value were analysed and presented as an average values. Entrained-flow commercial gasifiers can be considered as suitable for the coal slurry feed, however the ash content of coal slurries deposited in impoundments is too high for the direct use as the feed for the gasifiers. The moisture content of slurries calculated on as received basis meets the requirements of entrained-flow slurry feed gasifiers. The content of fines is relatively high which allow to use the slurries in entrained-flow gasifiers.

  15. Radiological control in a mine with a naturally occurring radioactive material - NORM: II assessment of external exposition in a pilot plant

    International Nuclear Information System (INIS)

    Pereira, W.S.; Py Junior, D.A.; Silva, A.C.A.; Garcia Filho, O.

    2013-01-01

    In the year of 2009, a pilot plant for uranium extraction from a phosphate mine to be installed at Santa Quiteria city, Ceara state, Brazil was carried out at the Ore Treatment Unit (OTU). During the operation of the pilot plant, the monitoring of external exposure in the area used by the pilot plant was conducted. 157 measurements were taken saving the data of the exposure rate and converting them to external dose. The background (BG) of the area was measured before the beginning of the operation and was estimated as 0.340 μSv h -1 ; only two measurements, out of the 157, were below the BG. The dose rates varied from 0.304 μSv h -1 to 0.814 μSv h -1 , with an average equal to 0.544 μSv h -1 . When the results were compared to the derived limit for member of the public, which is equal to μSv h -1 , approximately 38 % of the results were below this limit. Approximately 50 % of the results were below 0.554 μSv h -1 and approximately 95 % of the results were below 0.754 μSv h -1 . By this criterion only, the area must be considered as a supervised area. In order to classify the area in definitive, the internal exposure must also be evaluated. In this installation significant internal doses are not to be expected, considering that most part of the process is conducted by a wet route, without dust or aerosol generation, that when inhaled should create internal doses. (author)

  16. Feasibilities of a Coal-Biomass to Liquids Plant in Southern West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    Bhattacharyya, Debangsu [West Virginia Univ., Morgantown, WV (United States); DVallance, David [West Virginia Univ., Morgantown, WV (United States); Henthorn, Greg [West Virginia Univ., Morgantown, WV (United States); Grushecky, Shawn [West Virginia Univ., Morgantown, WV (United States)

    2016-09-30

    This project has generated comprehensive and realistic results of feasibilities for a coal-biomass to liquids (CBTL) plant in southern West Virginia; and evaluated the sensitivity of the analyses to various anticipated scenarios and parametric uncertainties. Specifically the project has addressed economic feasibility, technical feasibility, market feasibility, and financial feasibility. In the economic feasibility study, a multi-objective siting model was developed and was then used to identify and rank the suitable facility sites. Spatial models were also developed to assess the biomass and coal feedstock availabilities and economics. Environmental impact analysis was conducted mainly to assess life cycle analysis and greenhouse gas emission. Uncertainty and sensitivity analysis were also investigated in this study. Sensitivity analyses on required selling price (RSP) and greenhouse gas (GHG) emissions of CBTL fuels were conducted according to feedstock availability and price, biomass to coal mix ratio, conversion rate, internal rate of return (IRR), capital cost, operational and maintenance cost. The study of siting and capacity showed that feedstock mixed ratio limited the CBTL production. The price of coal had a more dominant effect on RSP than that of biomass. Different mix ratios in the feedstock and conversion rates led to RSP ranging from $104.3 - $157.9/bbl. LCA results indicated that GHG emissions ranged from 80.62 kg CO2 eq to 101.46 kg CO2 eq/1,000 MJ of liquid fuel at various biomass to coal mix ratios and conversion rates if carbon capture and storage (CCS) was applied. Most of water and fossil energy were consumed in conversion process. Compared to petroleum-derived-liquid fuels, the reduction in GHG emissions could be between -2.7% and 16.2% with CBTL substitution. As for the technical study, three approaches of coal and biomass to liquids, direct, indirect and hybrid, were considered in the analysis. The process models including

  17. Combustion and environmental performance of clean coal end products

    Energy Technology Data Exchange (ETDEWEB)

    Skodras, G.; Sakellaropoulos, G. [Centre for Research and Technology, Hellas, Ptolemaidas-Kozanis, Ptolemaida (Greece). Inst. for Solid Fuel Technolgy and Applications]|[Aristotle Univ. of Thessaloniki, Thessaloniki (Greece). Dept. of Chemical Engineering, Chemical Process Engineering Lab]|[Chemical Process Engineering Research Inst., Thessaloniki (Greece). Lab. of Solid Fuels and Environment; Someus, E. [Thermal Desorption Technology Group (Greece); Grammelis, P.; Amarantos, P.S. [Centre for Research and Technology, Hellas, Ptolemaidas-Kozanis, Ptolemaida (Greece). Inst. for Solid Fuel Technolgy and Applications; Palladas, A.; Basinas, P.; Natas, P.; Prokopidou, M.; Diamantopoulou, I.; Sakellaropoulos, G. [Aristotle Univ. of Thessaloniki, Thessaloniki (Greece). Dept. of Chemical Engineering, Chemical Process Engineering Lab

    2006-07-01

    Clean and affordable power production is needed in order to achieve sustainable economic development. This paper focused on clean coal technologies in which coal-fired power plants are used in conjunction with large amounts of renewable energy sources to offer a high level of process safety and long term management of all residual operation streams. Thermal Desorption Recycle-Reduce-Reuse Technology (TDT-3R) was described as being a promising solid fuel pretreatment process for clean energy production up to 300 MWe capacities. TDT-3R is based on low temperature carbonisation fuel pre-treatment principles, which produce cleansed anthracite type fuels from coal and other carbonaceous material such as biomass and organic wastes. The combustion efficiency of such clean coals and the environmental performance of the TDT-3R process were investigated in this study via pilot scale tests of clean fuel production. Tests included flue gas emissions monitoring, raw fuel and product characterisation and thermogravimetric tests, polychlorinated dibenzo-p-dioxins and dibenzo-furans, and heavy metals analyses, and toxicity tests. Raw material included coal and biomass, such as willow, straw and demolition wood. The fuels were heated in a rotary kiln operating at 550 degrees C under slightly vacuum conditions. Clean coals were tested either alone or in conjunction with biomass fuels in a pilot scale combustion facility at Dresden, Germany. The clean coal samples were shown to have higher fixed carbon and ash content and lower volatiles compared to the respective raw coal samples. The major advantage of the TDT-3R process is the production of fuels with much lower pollutants content. Low nitrogen, sulphur, chlorine and heavy metal contents result in produced fuels that have excellent environmental performance, allow boiler operation in higher temperatures and overall better efficiency. Moreover, the use of clean fuels reduces deposition problems in the combustion chamber due to the

  18. Thermodynamic analysis and economic evaluation of a 1000 MW bituminous coal fired power plant incorporating low-temperature pre-drying (LTPD)

    International Nuclear Information System (INIS)

    Xu, Cheng; Xu, Gang; Zhu, Mingming; Dong, Wei; Zhang, Yang; Yang, Yongping; Zhang, Dongke

    2016-01-01

    Highlights: • An improved design of coal pre-drying using flue gas waste heat was proposed. • 0.4% energy efficiency increase was achieved with the proposed system. • The additional net economic benefit of the proposed system is $1.91 M per year. • Proposed concept can be widely applied to improve coal-fired power plant efficiency. - Abstract: Low-temperature pre-drying (LTPD) of lignite has been identified as an effective approach to improve the efficiency of lignite fired power plants. In this study, an improved concept for the pre-drying of medium moisture bituminous coals using flue gas waste heat was proposed and its feasibility was assessed. In the proposed configuration, the boiler exhaust flue gas is drawn to dryers to heat and pre-dry the raw coal, removing a large proportion of the coal moisture and leading to an improvement in the energy efficiency of the power plant. Thermodynamic analysis and economic evaluation were performed based on a typical 1000 MW bituminous coal fired power plant incorporating the proposed LTPD concept. The results showed that the net power plant efficiency gain is as much as 0.4 percentage point with additional net power output of 9.3 MW as compared to the reference plant without coal pre-drying. This was attributed to the reduction in the moisture content from 10.3 to 2.7 wt%. The additional net economic benefit attained due to the coal pre-drying was estimated to reach $1.91 M per year. This work provides a broadly applicable and economically feasible approach to further improve the energy efficiency of power plants firing coals with medium moisture contents.

  19. pH-dependent leaching of dump coal ash - retrospective environmental analysis

    Energy Technology Data Exchange (ETDEWEB)

    Popovic, A.; Djordjevic, D. [University of Belgrade, Belgrade (Serbia). Dept. of Chemistry

    2009-07-01

    Trace and major elements in coal ash particles from dump of 'Nikola Tesla A' power plant in Obrenovac near Belgrade (Serbia) can cause pollution, due to leaching by atmospheric and surface waters. In order to assess this leaching potential, dump ash samples were subjected to extraction with solutions of decreasing pH values (8.50, 7.00, 5.50, and 4.00), imitating the reactions of the alkaline ash particles with the possible alkaline, neutral, and acidic (e.g., acid rain) waters. The most recently deposited ash represents the greatest environmental threat, while 'aged' ash, because of permanent leaching on the dump, was shown to have already lost this pollution potential. On the basis of the determined leachability, it was possible to perform an estimation of the acidity of the regional rainfalls in the last decades.

  20. Opening of the first CO{sub 2} capture installation on the fumes of a coal power plant - european project Castor, Denmark; Inauguration de la premiere installation de captage du CO{sub 2} sur les fumees d'une centrale electrique au charbon - Projet europeen Castor, Danemark

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-03-15

    The 15 March 2006, was launched the first industrial pilot of CO{sub 2} capture of the Castor project, coordinated by the IFP and financed by the european commission, on the site of the Esbjerg (Denmark) power plant. It is the first world installation allowing the CO{sub 2} capture on the fumes of a coal power plant. This document presents the pilot installation, discusses the european project Castor, the advantages of the CO{sub 2} capture and storage for a better use of the fossil energies, where and how capturing the CO{sub 2} and the Denmark energy context. (A.L.B.)

  1. Determination of radioactive trace elements in ashes and fly-ashes from Brazilian coal-fired power plants

    International Nuclear Information System (INIS)

    Bellido, L.F.; de Castro Arezzo, B.

    1984-01-01

    The aim of this work was to apply a epithermal neutron activation technique to determine the uranium and thorium content in coal ashes and fly ashes from Brazilian coal-fired thermoelectric plants and to evaluate the contribution of these elements and their descendents to the environmental radioactivity. Brazil has adopted as short term policy the use of alcohol and coal as alternative sources of energy. With regard to coal, large deposits of this mineral are found in southern states but the serious problem of its utilization is the risk of environmental contamination which can reach dangerous levels because the industrial plants burn several million tons per year. Uranium and thorium contents, determined experimentally, are extrapolated for annual coal consumption and their amounts and the activity of the radium isotopes descendents released to the atmosphere are calculated. The significance of these values and problems in environmental pollution are discussed

  2. Leaching characteristics of toxic constituents from coal fly ash mixed soils under the influence of pH

    Energy Technology Data Exchange (ETDEWEB)

    Komonweeraket, Kanokwan [Department of Civil and Environmental Engineering, University of Wisconsin, Madison, WI 53706 (United States); Cetin, Bora, E-mail: bora.cetin@sdsmt.edu [College of Engineering, University of Georgia, Athens, GA 30602 (United States); Benson, Craig H., E-mail: chbenson@wisc.edu [Department of Civil and Environmental Engineering, University of Wisconsin, Madison, WI 53706 (United States); Aydilek, Ahmet H., E-mail: aydilek@umd.edu [Department of Civil and Environmental Engineering, University of Maryland, College Park, MD 20742 (United States); Edil, Tuncer B., E-mail: edil@engr.wisc.edu [Department of Civil and Environmental Engineering, University of Wisconsin, Madison, WI 53706 (United States)

    2015-04-15

    Highlights: • The impact of pH on the leaching of elements and metals from fly ash mixed soils. • Generally Ca, Cd, Mg, and Sr follows a cationic leaching pattern. • The leaching of As and Se shows an oxyanionic leaching pattern. • The leaching behavior of elements does not change based on material type. • Different fly ash types show different abilities in immobilizing trace elements. - Abstract: Leaching behaviors of Arsenic (As), Barium (Ba), Calcium (Ca), Cadmium (Cd), Magnesium (Mg), Selenium (Se), and Strontium (Sr) from soil alone, coal fly ash alone, and soil-coal fly ash mixtures, were studied at a pH range of 2–14 via pH-dependent leaching tests. Seven different types of soils and coal fly ashes were tested. Results of this study indicated that Ca, Cd, Mg, and Sr showed cationic leaching pattern while As and Se generally follows an oxyanionic leaching pattern. On the other hand, leaching of Ba presented amphoteric-like leaching pattern but less pH-dependent. In spite of different types and composition of soil and coal fly ash investigated, the study reveals the similarity in leaching behavior as a function of pH for a given element from soil, coal fly ash, and soil-coal fly ash mixtures. The similarity is most likely due to similar controlling mechanisms (e.g., solubility, sorption, and solid-solution formation) and similar controlling factors (e.g., leachate pH and redox conditions). This offers the opportunity to transfer knowledge of coal fly ash that has been extensively characterized and studied to soil stabilized with coal fly ash. It is speculated that unburned carbon in off-specification coal fly ashes may provide sorption sites for Cd resulting in a reduction in concentration of these elements in leachate from soil-coal fly ash mixture. Class C fly ash provides sufficient CaO to initiate the pozzolanic reaction yielding hydrated cement products that oxyanions, including As and Se, can be incorporated into.

  3. Pollution control technologies applied to coal-fired power plant operation

    Directory of Open Access Journals (Sweden)

    Maciej Rozpondek

    2009-09-01

    Full Text Available Burning of fossil fuels is the major source of energy in today's global economy with over one-third of the world's powergeneration derived from coal combustion. Although coal has been a reliable, abundant, and relatively inexpensive fuel source for mostof the 20th century, its future in electric power generation is under increasing pressure as environmental regulations become morestringent worldwide. Current pollution control technologies for combustion exhaust gas generally treat the release of regulatedpollutants: sulfur dioxide, nitrogen oxides and particulate matter as three separate problems instead of as parts of one problem. Newand improved technologies have greatly reduced the emissions produced per ton of burning coal. The term “Clean Coal CombustionTechnology” applies generically to a range of technologies designed to greatly reduce the emissions from coal-fired power plants.The wet methods of desulfurization at present are the widest applied technology in professional energetics. This method is economicand gives good final results but a future for clean technologies is the biomass. Power from biomass is a proven commercial optionof the electricity generation in the World. An increasing number of power marketers are starting to offer environmentally friendlyelectricity, including biomass power, in response to the consumer demand and regulatory requirements.

  4. Mineralogical, Microstructural and Thermal Characterization of Coal Fly Ash Produced from Kazakhstani Power Plants

    Science.gov (United States)

    Tauanov, Z.; Abylgazina, L.; Spitas, C.; Itskos, G.; Inglezakis, V.

    2017-09-01

    Coal fly ash (CFA) is a waste by-product of coal combustion. Kazakhstan has vast coal deposits and is major consumer of coal and hence produces huge amounts of CFA annually. The government aims to recycle and effectively utilize this waste by-product. Thus, a detailed study of the physical and chemical properties of material is required as the data available in literature is either outdated or not applicable for recently produced CFA samples. The full mineralogical, microstructural and thermal characterization of three types of coal fly ash (CFA) produced in two large Kazakhstani power plants is reported in this work. The properties of CFAs were compared between samples as well as with published values.

  5. New Source Review and coal plant efficiency gains: How new and forthcoming air regulations affect outcomes

    International Nuclear Information System (INIS)

    Adair, Sarah K.; Hoppock, David C.; Monast, Jonas J.

    2014-01-01

    Forthcoming carbon dioxide (CO 2 ) regulations for existing power plants in the United States have heightened interest in thermal efficiency gains for coal-fired power plants. Plant modifications to improve thermal efficiency can trigger New Source Review (NSR), a Clean Air Act requirement to adopt of state-of-the-art pollution controls. This article explores whether existing coal plants would likely face additional pollution control requirements if they undertake modifications that trigger NSR. Despite emissions controls that are or will be installed under the Mercury and Air Toxics Standards (MATS) and Clean Air Interstate Rule (CAIR) or its replacement, 80% of coal units (76% of capacity) that are expected to remain in operation are not projected to meet the minimum NSR requirements for at least one pollutant: nitrogen oxides or sulfur dioxide. This is an important consideration for the U.S. Environmental Protection Agency and state policymakers as they determine the extent to which CO 2 regulation will rely on unit-by-unit thermal efficiency gains versus potential flexible compliance strategies such as averaging, trading, energy efficiency, and renewable energy. NSR would likely delay and add cost to thermal efficiency projects at a majority of coal units, including projects undertaken to comply with forthcoming CO 2 regulation. - Highlights: • We explore the status of the U.S. coal-fired fleet relative to New Source Review (NSR) requirements. • Modifications to improve thermal efficiency can trigger NSR. • Thermal efficiency gains may also be an important strategy for forthcoming CO 2 regulation. • 80% Of non-retiring coal-fired units are projected not to meet minimum NSR requirements. • NSR is an important consideration for the design of CO 2 regulations for existing plants

  6. Coal transitions in China's power sector: A plant-level assessment of stranded assets and retirement pathways

    International Nuclear Information System (INIS)

    Spencer, Thomas; Berghmans, Nicolas; Sartor, Oliver

    2017-11-01

    This paper estimates the potential scale of stranded assets in the coal power sector in China under different policy scenarios. A number of factors are putting significant pressure on the coal-power sector: a recent investment bubble in new capacity, structural slowing in electricity demand growth, upcoming moves to liberalize electricity markets and introduce a carbon market, and continued support for renewable and low-carbon sources of electricity. Stranded assets in the Chinese coal-fired power sector are estimated at 90 billion USD 2015 under the current policy trajectory (NDC-Style Scenario). This situation threatens to increase the political economy challenges of China's electricity sector transition to a low-carbon system. This situation is not unique to China: other countries will also face coal-sector stress due to the competitiveness of renewables, and therefore managing existing coal power capacities needs to move to the forefront of climate and energy policy efforts. To turn this situation around, Chinese authorities should have a strategy for a managed phase-down of coal power assets. All new construction of coal power plants should cease: recent project cancellations have been a step in the right direction. A planned retirement schedule for old coal plants that have already made a return on investment should be developed to 2030. Existing, newer coal plants should be prepared to play a role and receive revenues for balancing a high renewables system. A managed 2 deg. C-compatible climate mitigation scenario, in which old plant are retired after 30 years, both puts China's electricity sector on an accelerated pathway to decarbonization, as well as lowering the risks of stranded assets compared to the NDC-Style Scenario, by a total of 12 billion USD 2015. Banking sector exposure to stranded assets in the Managed 2 deg. C Scenario are estimated at less than 10% of the banking sector's loan loss provisions: risks of financial disruption are

  7. Long term pilot plant experience on aromatics extraction with ionic liquids

    NARCIS (Netherlands)

    Meindersma, W.G.W.; Onink, F.S.A.F.; Hansmeier, A.R.; Haan, de A.B.

    2012-01-01

    Since 2004, we have been conducting pilot plant trials with various contactors and different ionic liquids for petrochemical model feeds as well as real refinery feeds. Our pilot plant contains a Rotating Disc Contactor with a height of 6 m and a diameter of 60 mm. Up to 100 kg of ionic liquid and

  8. Prevention of trace and major element leaching from coal combustion products by hydrothermally-treated coal ash

    Energy Technology Data Exchange (ETDEWEB)

    Adnadjevic, B.; Popovic, A.; Mikasinovic, B. [University of Belgrade, Belgrade (Serbia). Dept. of Chemistry

    2009-07-01

    The most important structural components of coal ash obtained by coal combustion in 'Nikola Tesla A' power plant located near Belgrade (Serbia) are amorphous alumosilicate, alpha-quartz, and mullite. The phase composition of coal ash can be altered to obtain zeolite type NaA that crystallizes in a narrow crystallization field (SiO{sub 2}/Al{sub 2}O{sub 3}; Na{sub 2}O/SiO{sub 2}; H{sub 2}O/Na{sub 2}O ratios). Basic properties (crystallization degree, chemical composition, the energy of activation) of obtained zeolites were established. Coal ash extracts treated with obtained ion-exchange material showed that zeolites obtained from coal ash were able to reduce the amounts of iron, chromium, nickel, zinc, copper, lead, and manganese in ash extracts, thus proving its potential in preventing pollution from dump effluent waters.

  9. Coal dust symposium

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    This paper gives a report of the paper presented at the symposium held in Hanover on 9 and 10 February 1981. The topics include: the behaviour of dust and coal dust on combustion and explosion; a report on the accidents which occurred at the Laegerdorf cement works' coal crushing and drying plant; current safety requirements at coal crushing and drying plant; and coal crushing and drying. Four papers are individually abstracted. (In German)

  10. Deposit formation in a full-scale pulverized wood-fired power plant with and without coal fly ash addition

    DEFF Research Database (Denmark)

    Wu, Hao; Shafique Bashir, Muhammad; Jensen, Peter Arendt

    2013-01-01

    Ash transformation and deposition in a pulverized wood-fired power plant boiler of 800 MWth were studied with and without the addition of coal fly ash. The transient ash deposition behavior was investigated by using an advanced deposit probe system at two different boiler locations with flue gas...... at the low-temperature location showed a slow initial build-up and a stable mass of deposits after approximately 1-5 h. The deposits collected during pulverized wood combustion contained a considerable amount of K2SO4, KCl, and KOH/K2CO3. With the addition of coal fly ash (~4 times of the mass flow of wood...... ash) to the boiler, these alkali species were effectively removed both in the fly ash and in the deposits, and a more frequent shedding of the deposits was observed. The results imply that coal fly ash can be an effective additive to reduce ash deposition and corrosion problems in a pulverized wood...

  11. Thermal coal utilization for the ESCAP region

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    A selection of papers is presented originating from talks to coal utilization workshops for the ASEAN region in 1981. The papers cover: planning aspects - economic and technical aspects of coal usage, long term planning for fuel coal needs, planning and coal selection for coal-fired power plants, coal availability and marketing, and economic aspects of coal usage in developing countries; combustion and plant - changing from coal to oil, principles and problems of coal combustion, use of indigenous and imported coals and their effects on plant design, coal pulverizing mills, ash and dust disposal, environmental aspects of coal combustion, industrial sized coal-fired boilers; transport and storage -ocean shipment, coal receival facilities and associated operations, shipping and rail transport, coal handling and transport, environmental issue in the transport and handling of coal, coal preparation and blending; testing and properties - coal types, characterization properties and classification; training power plant operators; the cement industry and coal, the Australian black coal industry.

  12. The Net Climate Impact of Coal-Fired Power Plant Emissions

    Science.gov (United States)

    Shindell, D.; Faluvegi, G.

    2010-01-01

    Coal-fired power plants influence climate via both the emission of long-lived carbon dioxide (CO2) and short-lived ozone and aerosol precursors. Using a climate model, we perform the first study of the spatial and temporal pattern of radiative forcing specifically for coal plant emissions. Without substantial pollution controls, we find that near-term net global mean climate forcing is negative due to the well-known aerosol masking of the effects of CO2. Imposition of pollution controls on sulfur dioxide and nitrogen oxides leads to a rapid realization of the full positive forcing from CO2, however. Long-term global mean forcing from stable (constant) emissions is positive regardless of pollution controls. Emissions from coal-fired power plants until 1970, including roughly 1/3 of total anthropogenic CO2 emissions, likely contributed little net global mean climate forcing during that period though they may have induce weak Northern Hemisphere mid-latitude (NHml) cooling. After that time many areas imposed pollution controls or switched to low sulfur coal. Hence forcing due to emissions from 1970 to 2000 and CO2 emitted previously was strongly positive and contributed to rapid global and especially NHml warming. Most recently, new construction in China and India has increased rapidly with minimal application of pollution controls. Continuation of this trend would add negative near-term global mean climate forcing but severely degrade air quality. Conversely, following the Western and Japanese pattern of imposing air quality pollution controls at a later time could accelerate future warming rates, especially at NHmls. More broadly, our results indicate that due to spatial and temporal inhomogeneities in forcing, climate impacts of multi-pollutant emissions can vary strongly from region to region and can include substantial effects on maximum rate-of-change, neither of which are captured by commonly used global metrics. The method we introduce here to estimate

  13. Coal handling system structural analysis for modifications or plant life extension

    International Nuclear Information System (INIS)

    Dufault, A.; Weider, F.; Doyle, P.

    1989-01-01

    One neglected aspect of plant modification or life extension is the extent to which previous projects may have affected the integrity of existing structures. During the course of a project to backfit fire protection facilities to existing coal handling systems, it was found that past modifications had added loads to existing coal handling structures which exceeded the available design margin. This paper describes the studies that discovered the original problem areas, as well as the detailed analysis and design considerations used to repair these structures

  14. A pilot plant for removing chromium from residual water of tanneries.

    Science.gov (United States)

    Landgrave, J

    1995-02-01

    The purpose of this study is to develop a technical process for removing trivalent chromium from tannery wastewater via precipitation. This process can be considered an alternative that avoids a remediation procedure against the metal presence in industrial wastes. This process was verified in a treatment pilot plant located in León, México handling 10 m3/day of three types of effluents. The effluent streams were separated to facilitate the elimination of pollutants from each one. The process was based on in situ treatment and recycle to reduce problems associated with transportation and confinement of contaminated sludges. Two types of treatment were carried out in the pilot plant: The physical/chemical and biological treatments. Thirty-five experiments were conducted and the studied variables were the pH, type of flocculant, and its dose. The statistical significance of chromium samples was 94.7% for its precipitation and 99.7% for recovery. The objectives established for this phase of the development were accomplished and the overall efficiencies were measured for each stage in the pilot plant. The results were: a) chromium precipitation 99.5% from wastewater stream, b) chromium recovery 99% for recycling, and c) physical/chemical treatment to eliminate grease and fat at least 85% and 65 to 70% for the biological treatment. The tanning of a hide lot (350 pieces) was accomplished using 60% treated and recycled water without affecting the product quality. The recovered chromium liquor was also used in this hide tanning. This technical procedure is also applicable for removing heavy metals in other industrial sectors as well as in reducing water consumption rates, if pertinent adjustments are implemented.

  15. Digital bus technology in new coal-fired plants

    Energy Technology Data Exchange (ETDEWEB)

    Blaney, J.; Murray, J. [Emerson Process Management (United States)

    2007-10-15

    The main issues associated with including digital bus technology such as Foundation fieldbus, Profibus-DP or DeviceNet, in a coal-fired power plant are deciding which systems to install and determining how to implement it. Although still new, digital bus experiences to date have shown that the technology performs solidly and when wiring best practices are followed a significantly shorted commissioning cycle can be achieved. 1 fig., 2 tabs.

  16. Utilizing Coal Ash and Humic Substances as Soil Ameliorant on Reclaimed Post-Mining Land

    Directory of Open Access Journals (Sweden)

    Ade Mariyam Oklima

    2014-09-01

    Full Text Available Coal ash and humic substances can be used as soil ameliorant in the reclamation of formerly mined land. Due to its high pH and nutrients content, coal ash can be used to improve the chemical properties of the soil, such as increasing of pH, and increasing the levels of nutrients availability in the soil. Humic substances may also be used to complement, as they can increase the release of nutrients from the coal ash. Thus, the objective of this study was to assess the influence of coal ash and humic substances on soil chemical characteristics, nutrient absorption, and plant growth. This study was conducted in two locations - in a nursery area, involving two treatment factors: coal ash at different dosages (0, 200, and 400 g polybag-1, and humic material also at varying dosages (0, 0.04, and 0.08 g C polybag-1; and in a post-mining field using similar treatments: coal ash dosage (0, 2.5, and 5.0 kg planting-1 hole and humic material dosage (0, 0.56, and 1.12 g C planting hole-1. The results showed that coal ash and humic materials significantly increased the soil pH, available P, and exchangeable K, Ca and Mg. Coal ash also contained a number of heavy metals but in quantities that are far below the limits set by both Indonesian Government Regulation and the US Environmental Protection Agency (USEPA. The above soil amelioration effects mean that. applicaton of coal ash and humic substances can significantly increase the growth of Jabon trees in the reclaimed post-mining land.

  17. Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Britt, Phillip F [ORNL

    2015-03-01

    Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report. Summaries of conclusions, analytical processes, and analytical results. Analysis of samples taken from the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico in support of the WIPP Technical Assessment Team (TAT) activities to determine to the extent feasible the mechanisms and chemical reactions that may have resulted in the breach of at least one waste drum and release of waste material in WIPP Panel 7 Room 7 on February 14, 2014. This report integrates and summarizes the results contained in three separate reports, described below, and draws conclusions based on those results. Chemical and Radiochemical Analyses of WIPP Samples R-15 C5 SWB and R16 C-4 Lip; PNNL-24003, Pacific Northwest National Laboratory, December 2014 Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL); SRNL-STI-2014-00617; Savannah River National Laboratory, December 2014 Report for WIPP UG Sample #3, R15C5 (9/3/14); LLNL-TR-667015; Lawrence Livermore National Laboratory, January 2015 This report is also contained in the Waste Isolation Pilot Plant Technical Assessment Team Report; SRNL-RP-2015-01198; Savannah River National Laboratory, March 17, 2015, as Appendix C: Analysis Integrated Summary Report.

  18. Local deposition of mercury in topsoils around coal-fired power plants: is it always true?

    Science.gov (United States)

    Rodriguez Martin, José Antonio; Nanos, Nikos; Grigoratos, Theodoros; Carbonell, Gregoria; Samara, Constantini

    2014-09-01

    Mercury (Hg) is a toxic element that is emitted to the atmosphere through human activities, mainly fossil fuel combustion. Hg accumulations in soil are associated with atmospheric deposition, while coal-burning power plants remain the most important source of anthropogenic mercury emissions. In this study, we analyzed the Hg concentration in the topsoil of the Kozani-Ptolemais basin where four coal-fired power plants (4,065 MW) run to provide 50 % of electricity in Greece. The study aimed to investigate the extent of soil contamination by Hg using geostatistical techniques to evaluate the presumed Hg enrichment around the four power plants. Hg variability in agricultural soils was evaluated using 276 soil samples from 92 locations covering an area of 1,000 km(2). We were surprised to find a low Hg content in soil (range 1-59 μg kg(-1)) and 50 % of samples with a concentration lower than 6 μg kg(-1). The influence of mercury emissions from the four coal-fired power plants on soil was poor or virtually nil. We associate this effect with low Hg contents in the coal (1.5-24.5 μg kg(-1)) used in the combustion of these power plants (one of the most Hg-poor in the world). Despite anthropic activity in the area, we conclude that Hg content in the agricultural soils of the Kozani-Ptolemais basin is present in low concentrations.

  19. Fiscal 1997 report of the development of high efficiency waste power generation technology. No.2 volume. Pilot plant verification test; Kokoritsu haikibutsu hatsuden gijutsu kaihatsu (pilot plant jissho shiken). 1997 nendo hokokusho (daini bunsatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    As to a high efficiency waste power generation system using general waste as fuel, the details of the following were described: design/construction management and operational study of pilot plant, design/manufacture/construction of pilot plant, and study of an optimal total system. Concerning the construction management and operational study, the paper described the application for governmental/official inspection procedures and taking inspection, process management of pilot plant, site patrol, safety management, management of trial run of pilot plant, drawing-up of a verification test plan and test run, etc. Relating to the design/manufacture/construction of pilot plant, an outline of the pilot plant was described. The paper also stated points to be considered in design of furnace structure and boiler structure, points to be considered of the verification test, etc. As to the study of an optimal total system, the following were described: survey of waste gasification/slagging power generation technology, basic study on RDF production process, survey of trends of waste power generation technology in the U.S., etc. 52 refs., 149 figs., 121 tabs.

  20. Radiological Impact Study of the Coal-Fired Power Plant of Lada; Estudio del Impacto Radiologico de la Central Termica de Carbon de Lada

    Energy Technology Data Exchange (ETDEWEB)

    Robles, B.; Baeza, A.; Mora, J. C.; Corbacho, J. A.; Trueba, C.; Guillen, J.; Rodriguez, J.; Miralles, Y.

    2014-02-01

    Coal, fuel used in thermal power plants for electricity production, contains variable concentrations of naturally occurring radionuclides from natural disintegration series of 238{sup U}, 235{sup U}, 232{sup T}h and also the 40K, which are enhanced in the wastes and coproducts due to the industrial process. For this reason, natural radionuclides which are part of the noncombustible fraction of coal, except those volatiles which incorporate directly to the flue gases, concentrates and are partitioned between fly ashes and bottom ashes. This enhancement could cause, to the workers of the installation and to members of the public around the plant, an increase in the exposure which should be assessed under the radiation protection point of view. Present report collect the results obtained from a screening assessment of the radiological impact derived from the normal operation of the Lada coal-fired power plant. The project where this assessment was performed is part of a bigger project which is jointly developed by the Unit of Radiation Protection of the Public and the Environment (UPRPYMA) of CIEMAT and the Environmental Radioactivity Laboratory of the Extremadura University (LARUEX) in agreement with the Spanish Association of the Electrical Industry (ENUSA). (Author)

  1. Preliminary experiences with material testing at the oxyfuel pilot plant at Schwarze Pumpe

    Energy Technology Data Exchange (ETDEWEB)

    Hjoernhede, Anders [Vattenfall Power, Gothenborg (Sweden); Montgomery, Melanie [Technical Univ. Denmark, Lyngby (Denmark). Inst. for Mekanisk Teknologi; Vattenfall Heat Nordic, Lyngby (Denmark); Bjurman, Martin; Henderson, Pamela [Vattenfall AB (Sweden). Research and Development; Gerhardt, Alexander [Vattenfall AB, Berlin (Germany). Research and Development

    2010-07-01

    Several material related issues may arise from oxyfuel combustion of coal due to the presence of CO{sub 2} but also as an effect of the partial recirculation of the flue gas. Two examples are increased corrosion and carburisation which may limit steam data, hence limiting the efficiency. A number of corrosion tests, in both conventional air-firing and oxyfuel mode, have been made in Vattenfalls 30 MW oxyfuel pilot plant located in Schwarze Pumpe, Germany. Internally cooled corrosion probes, equipped with ferritic, austenitic, super austenitic steels as well as Ni-based and FeCrAl alloys, simulating superheaters, economisers and air preheaters were exposed for up to 1500 hrs. The analyses show an indication of higher material wastage in oxyfuel compared to air combustion especially at the lower exposure temperatures. This may be due to increased sulphur concentration in corrosion front, increased heat flux, carburisation or other precipitate formations on austenitic steels and Ni-based alloys. (orig.)

  2. Mixtures of coal ash and compost as substrates for highbush blueberry

    Energy Technology Data Exchange (ETDEWEB)

    Black, B.L.; Zimmerman, R.H. [ARS, Beltsville, MD (USA). USDA Henry A Wallace Beltsville Agriculture Research Center, Fruit Lab.

    2002-07-01

    Bottom ash from a coal-fired power plant and two composts were tested as components of soil-free media and as soil amendments for growing highbush blueberry (Vaccinium corymbosum L.). Combinations of ash and compost were compared to Berryland sand, and Manor clay loam, and compost amended Manor clay loam. The pH of all treatment media was adjusted to 4.5 with sulfur at the beginning of the experiment. In 1997, plants of 'Bluecrop' and 'Sierra' were planted in 15-dm{sup 3} pots containing the pH-adjusted treatment media. The first substantial crop was harvested in 1999. At the end of the 1999 season, one half of the plants were destructively harvested for growth analysis. The remaining plants were cropped again in 2000. Yield and fruit size data were collected in both seasons, and leaf and fruit samples were collected in 1999 for elemental analysis. The presence of coal ash or composted biosolids in the media had no detrimental effect on leaf or fruit elemental content. Total growth and yield of both cultivars was reduced in clay loam soil compared to Berryland sand, whereas growth and yield of plants in coal ash-compost was similar to or exceeded that of plants in Berryland sand.

  3. Computational fluid dynamics (CFD) analysis of the coal combustion in a boiler of a thermal power plant using different kinds of the manufactured coals

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Cristiano Vitorino da; Lazzari, Luis Carlos; Ziemniczak, Aline; Beskow, Arthur Bortolin [Universidade Regional Integrada do Alto Uruguai e das Missoes (URI), Erechim, RS (Brazil)], E-mails: cristiano@uricer.edu.br, arthur@uricer.edu.br

    2010-07-01

    The state of the art in computational fluid dynamics and the availability of commercial codes encourage numerical studies of combustion processes. In the present work the commercial software CFX Ansys Europe Ltd. has been used to study the combustion of pulverized coal into the boiler of a thermal power plant. The objective of this work is to obtain new information for process optimization. Different kinds of manufactured coals were numerically tested in a thermal power plant installed at the southeast region of Brazil. The simulations were made using the actual burning conditions of the boiler. Results include the residence time of the fuel into the combustion chamber, temperature fields, flow fluid mechanics, heat transfer and pollutant formation, as well as the CO and NOx concentrations, aiming to determinate the best conditions to burn the investigated coals. The numerical investigation of the phenomena involved on the coal combustion processes are used to complete the experimental information obtained in operational tests. Considering the characteristics of different kinds of manufactured coals used, with this study is possible to achieve the most efficient boiler operation parameters, with decreasing costs of electricity production and reduction of environmentally harmful emissions. It was verified that the different kinds of manufactured coals demand different operation conditions, and the kind of manufactured coal used on the combustion process has a significant effect on the pollutant formation, mainly in rel action with ash concentration. (author)

  4. Update on the modernization of 200 MW hard coal power plants in Poland

    International Nuclear Information System (INIS)

    Szabo, T.E.; Kopec, M.

    1993-01-01

    In June 1990, the Coalition of 200 MW, Hard Coal, Polish Power Plants representing an installed base of 10,240 MW, including 45 units of 200 MW, signed an agreement with the Westinghouse Electric Corporation, Power Generation Business Unit, based in Orlando, Florida, to cooperate on developing a modernization program for the 200 MW units. Program funding was obtained with The United States Trade Development Program (TDP) providing approximately 2/3 of the cost, and the balance provided by Westinghouse. On March 5, 1992, the Polish-American (51% Westinghouse, 49% Seven (7) Hard Coal Power Plants), Joint Venture Company, MODELPOL, Ltd. (Polish acronym for 'MODernizacja ELektrowni POLskich' or Modernization of Polish Power Plants) was established with the goal to implement not only technically but financially the recommendations of the Modernization Study. The mission given MODELPOL, Ltd. by their Polish-American Shareholders was to: develop the specific modernization programs for each hard coal power plant; assist in identifying and obtaining the financial resources required for implementation; and provide technological preventative maintenance services to improve unit availability. Within these aims was the target to reduce SO 2 , and particulate emissions. The first program is taking place at the Laziska Power Plant, followed by Rybnik. Further projects are in the planning stages. Finance is a constant problem, this should be eased by the restructuring of the power industry. Future programmes include connection to the European Community Power Grid. 5 figs

  5. Thermal Integration of CO{sub 2} Compression Processes with Coal-Fired Power Plants Equipped with Carbon Capture

    Energy Technology Data Exchange (ETDEWEB)

    Edward Levy

    2012-06-29

    Coal-fired power plants, equipped either with oxycombustion or post-combustion CO{sub 2} capture, will require a CO{sub 2} compression system to increase the pressure of the CO{sub 2} to the level needed for sequestration. Most analyses show that CO{sub 2} compression will have a significant effect on parasitic load, will be a major capital cost, and will contribute significantly to reduced unit efficiency. This project used first principle engineering analyses and computer simulations to determine the effects of utilizing compressor waste heat to improve power plant efficiency and increase net power output of coal-fired power plants with carbon capture. This was done for units with post combustion solvent-based CO{sub 2} capture systems and for oxyfired power plants, firing bituminous, PRB and lignite coals. The thermal integration opportunities analyzed for oxycombustion capture are use of compressor waste heat to reheat recirculated flue gas, preheat boiler feedwater and predry high-moisture coals prior to pulverizing the coal. Among the thermal integration opportunities analyzed for post combustion capture systems are use of compressor waste heat and heat recovered from the stripper condenser to regenerate post-combustion CO{sub 2} capture solvent, preheat boiler feedwater and predry high-moisture coals. The overall conclusion from the oxyfuel simulations is that thermal integration of compressor heat has the potential to improve net unit heat rate by up to 8.4 percent, but the actual magnitude of the improvement will depend on the type of heat sink used and to a lesser extent, compressor design and coal rank. The simulations of a unit with a MEA post combustion capture system showed that thermal integration of either compressor heat or stripper condenser heat to preheat boiler feedwater would result in heat rate improvements from 1.20 percent to 4.19 percent. The MEA capture simulations further showed that partial drying of low rank coals, done in combination

  6. Regulation of suspended particulate matter (SPM) in Indian coal-based thermal power plants

    Science.gov (United States)

    Sengupta, Ishita

    Air borne particulate matter, in major Indian cities is at least three times the standard prescribed by the WHO. Coal-based thermal power plants are the major emitters of particulate matter in India. The lack of severe penalty for non-compliance with the standards has worsened the situation and thus calls for an immediate need for investment in technologies to regulate particulate emissions. My dissertation studies the optimal investment decisions in a dynamic framework, for a random sample of forty Indian coal-based power plants to abate particulate emissions. I used Linear Programming to solve the double cost minimization problem for the optimal choices of coal, boiler and pollution-control equipment. A policy analysis is done to choose over various tax policies, which would induce the firms to adopt the energy efficient as well as cost efficient technology. The aim here is to reach the WHO standards. Using the optimal switching point model I show that in a dynamic set up, switching the boiler immediately is always the cost effective option for all the power plants even if there is no policy restriction. The switch to a baghouse depends upon the policy in place. Theoretically, even though an emission tax is considered the most efficient tax, an ash tax or a coal tax can also be considered to be a good substitute especially in countries like India where monitoring costs are very high. As SPM is a local pollutant the analysis here is mainly firm specific.

  7. Exergetic and environmental analysis of a pulverized coal power plant

    International Nuclear Information System (INIS)

    Restrepo, Álvaro; Miyake, Raphael; Kleveston, Fábio; Bazzo, Edson

    2012-01-01

    This paper presents the results of exergetic and environmental analysis of a typical pulverized coal power plant located in Brazil. The goal was to quantify both the exergy destruction and the environmental impact associated with a thermal power plant. The problem boundary consists of the entire coal delivery route, including mining and beneficiation, transport, pre-burning processes and the power plant. The used data were obtained mainly from field measurements taken in all system processes, from mining to the power plant. The study focused only on the operation period. Previous works have shown that the construction and decommissioning periods contribute less than 1% of the environmental impact. The exergetic analysis was based on the second law of thermodynamics while the environmental analysis was based on life cycle assessment (LCA) using SimaPro 7.2, focussing on the climate change and acidification impact categories. The CO 2 -eq emission was 1300 kg per MWh. The highest degree of environmental impact occurred during the combustion process. The exergetic and environmental analysis provides a tool to evaluate irreversibilities and the environmental impact, identifying the most significant stages and equipment of the entire power generation process. -- Highlights: ► Exergetic and environmental analysis of a typical Brazilian PC power plant. ► Environmental impact associated with the mining, transport and thermal power plant. ► Life cycle assessment used for environmental analysis. ► Acidification impact category evaluated using Eco-indicator 99. ► Climate change impact evaluation using (Global Warming Potential) GWP 100a.

  8. MERCURY EMISSIONS FROM COAL FIRED POWER PLANTS LOCAL IMPACTS ON HUMAN HEALTH RISK.

    Energy Technology Data Exchange (ETDEWEB)

    SULLIVAN, T.M.; BOWERMAN, B.; ADAMS, J.; LIPFERT, F.; MORRIS, S.M.; BANDO, A.; PENA, R.; BLAKE, R.

    2005-12-01

    A thorough quantitative understanding of the processes of mercury emissions, deposition, and translocation through the food chain is currently not available. Complex atmospheric chemistry and dispersion models are required to predict concentration and deposition contributions, and aquatic process models are required to predict effects on fish. However, there are uncertainties in all of these predictions. Therefore, the most reliable method of understanding impacts of coal-fired power plants on Hg deposition is from empirical data. A review of the literature on mercury deposition around sources including coal-fired power plants found studies covering local mercury concentrations in soil, vegetation, and animals (fish and cows). There is strong evidence of enhanced local deposition within 3 km of the chlor-alkali plants, with elevated soil concentrations and estimated deposition rates of 10 times background. For coal-fired power plants, the data show that atmospheric deposition of Hg may be slightly enhanced. On the scale of a few km, modeling suggests that wet deposition may be increased by a factor of two or three over background. The measured data suggest lower increases of 15% or less. The effects of coal-fired plants seem to be less than 10% of total deposition on a national scale, based on emissions and global modeling. The following summarizes our findings from published reports on the impacts of local deposition. In terms of excesses over background the following increments have been observed within a few km of the plant: (1) local soil concentration Hg increments of 30%-60%, (2) sediment increments of 18-30%, (3) wet deposition increments of 11-12%, and (4) fish Hg increments of about 5-6%, based on an empirical finding that fish concentrations are proportional to the square root of deposition. Important uncertainties include possible reductions of RGM to Hg{sub 0} in power plant plumes and the role of water chemistry in the relationship between Hg

  9. Coal yearbook 1993

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    This book is the first coal yearbook published by ATIC (France). In a first chapter, economical context of coal worldwide market is analyzed: comparative evaluations on coal exports and imports, coal industry, prices, production in USA, Australia, South Africa, China, former USSR, Poland, Colombia, Venezuela and Indonesia are given. The second chapter describes the french energy context: national coal production, imports, sectorial analysis, maritime transport. The third chapter describes briefly the technologies of clean coal and energy saving developed by Charbonnages de France: fossil-fuel power plants with combined cycles and cogeneration, fluidized beds for the recovery of coal residues, recycling of agricultural wastes (sugar cane wastes) in thermal power plant, coal desulfurization for air pollution abatement. In the last chapter, statistical data on coal, natural gas and crude oil are offered: world production, world imports, world exports, french imports, deliveries to France, coal balance, french consumption of primary energy, power generation by fuel type

  10. Fiscal 1991 report. Coal liquefaction committee; 1991 nendo sekitan ekika iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    The committee in this fiscal year had the 1st meeting in July 1991, the 2nd in August 1991, and the 3rd in March 1992, when fiscal 1990 research and development results, fiscal 1991 research and development programs, fiscal 1991 research and development results, etc., were reported and deliberated. At the 2nd meeting, the meaning of coal liquefaction technology development and how to go ahead with the task were described, which topic for discussion was entitled 'How coal liquefaction technology should be for the 21st century.' After discussion, it was agreed upon that a coal liquefaction technology package be completed in fiscal 2000 based on the absorption of each other's findings and on the utilization of basic studies common to both to be realized through the exchange of technologies between the brown coal liquefaction project and the bituminous coal liquefaction project. Under the brown coal liquefaction project, a 50 ton/day pilot plant was built and operated in Victoria, Australia, and the operation was completed in October 1990. The results of research and development under the coal brown liquefaction project will be compiled by fiscal 1993. (NEDO)

  11. Evaluation of NOX emissions from TVA coal-fired power plants

    International Nuclear Information System (INIS)

    Jones, J.W.; Stamey-Hall, S.

    1991-01-01

    The paper gives results of a preliminary evaluation of nitrogen oxide (NOx) emissions from 11 Tennessee Valley Authority (TVA) coal-fired power plants. Current EPA AP-42 emission factors for NOx from coal-fired utility boilers do not account for variations either in these emissions as a function of generating unit load, or in designs of boilers of the same general type, particularly wall-fired boilers. The TVA has compiled short-term NOx emissions data from 30 units at 11 TVA coal-fired plants. These units include cyclone, cell burner, single wall, opposed wall, single tangential, and twin tangential boiler firing designs. Tests were conducted on 29 of the 30 units at high load; 18 were also tested at reduced load. NOx emissions rates were calculated for each test and compared to the calculated rate for each boiler type using AP-42. Preliminary analysis indicates that: (1) TVA cyclone-fired units emit more NOx than estimated using AP-42; (2) TVA cell burner units emit considerably more NOx than estimated; (3) most TVA single-wall-fired units emit slightly more NOx than estimated; (4) most TVA single-furnace tangentially fired units emit less NOx than estimated at high load, but the same as (or more than) estimated at reduced load; and (5) most TVA twin-furnace tangentially fired units, at high load, emit slightly more NOx than estimated using AP-42

  12. Intelligent control and maintenance of management integrated system based on multi-agents for coal preparation plant

    Energy Technology Data Exchange (ETDEWEB)

    Meng, F.; Wang, Y. [China University of Mining and technology, Xuzhou (China). School of Information and Electrical Engineering

    2006-06-15

    This paper discusses the progress of computer integrated processing (CIPS) of coal preparation and then presents an intelligence controlled production process, device-maintenance and production-management system of coal preparation based on multi-agents (IICMMS-CP). The construction of the IICMMS-CP, the distributed network control system based on live intelligence control stations and the strategy of implementing a distributed intelligence control system are studied in order to overcome the disadvantages brought about by the wide use of the PLC system by coal preparation plants. The software frame, based on a Multi-Agent Intelligence Control and Maintenance Management integrated system, is studied and the implementation methods of IICMMS-CP are discussed. The characteristics of distributed architecture, cooperation and parallel computing meet the needs of integrated control of coal preparation plants with large-scale spatial production distribution, densely-related processes and complex systems. Its application further improves the reliability and precision of process control, accuracy of fault identification and intelligence of production adjustment, establishes a technical basis for system integration and flexible production. The main function of the system has been tested in a coal preparation plant to good effect in stabilizing product quality, improving efficiency and reducing consumption. 17 refs., 4 figs.

  13. Cost structure of coal- and nuclear-fired electric power plants

    International Nuclear Information System (INIS)

    Helmuth, J.A.

    1981-01-01

    This dissertation investigates the cost structure of coal and nuclear electric power generation. The emphasis of the paper is to empirically estimate the direct costs of generating base-load electric power at the plant level. Empirically, the paper first investigates the relative comparative costs of nuclear and coal power generation, based on historical operating data. Consideration of the learning curve and other dynamic elements is incorporated in the analysis. The second empirical thrust is to inestigate economies of scale for both technologies. The results from the empirical studies give an indication as to the future and present cost viability of each technology. Implications toward energy policy are discussed

  14. Effect of organized assemblies. Part 4. Formulation of highly concentrated coal-water slurry using a natural surfactant

    Energy Technology Data Exchange (ETDEWEB)

    Debadutta Das; Sagarika Panigrahi; Pramila K. Misra; Amalendu Nayak [Sambalpur University, Orissa (India). Centre of Studies in Surface Science and Technology

    2008-05-15

    Coal-water slurry has received considerable research nowadays due to its ability in substituting energy sources. The present work reports the formulation of highly concentrated coal-water slurry using a natural occurring surface active compound, saponin, extracted from the fruits of plant Sapindous laurifolia. The isolation of saponin from the plant and its surface activity has been discussed. The rheological characteristics of coal-water slurry have been investigated as a function of coal loading, ash content of coal, pH, temperature, and amount of saponin. The viscosity of the slurry and zeta potential are substantially decreased with concomitant shift of the isoelectric point of coal on adsorption of saponin to it. In the presence of 0.8% of saponin, coal-water slurry containing 64% weight fraction of coal could be achieved. The slurry is stable for a period of as long as 1 month in contrast to 4-5 h in the case of bare coal-water slurry. The results confirm the use of saponin as a suitable additive for coal-water slurry similar to the commercially available additive such as sodium dodecyl sulfate. Basing on the effect of pH on the zeta potential and viscosity of slurry, a suitable mechanism for saponin-coal interaction and orientation of saponin at the coal-water interface has been proposed. 47 refs., 12 figs., 5 tabs.

  15. Advanced Acid Gas Separation Technology for the Utilization of Low Rank Coals

    Energy Technology Data Exchange (ETDEWEB)

    Kloosterman, Jeff

    2012-12-31

    Air Products has developed a potentially ground-breaking technology – Sour Pressure Swing Adsorption (PSA) – to replace the solvent-based acid gas removal (AGR) systems currently employed to separate sulfur containing species, along with CO{sub 2} and other impurities, from gasifier syngas streams. The Sour PSA technology is based on adsorption processes that utilize pressure swing or temperature swing regeneration methods. Sour PSA technology has already been shown with higher rank coals to provide a significant reduction in the cost of CO{sub 2} capture for power generation, which should translate to a reduction in cost of electricity (COE), compared to baseline CO{sub 2} capture plant design. The objective of this project is to test the performance and capability of the adsorbents in handling tar and other impurities using a gaseous mixture generated from the gasification of lower rank, lignite coal. The results of this testing are used to generate a high-level pilot process design, and to prepare a techno-economic assessment evaluating the applicability of the technology to plants utilizing these coals.

  16. Statistical modeling of an integrated boiler for coal fired thermal power plant.

    Science.gov (United States)

    Chandrasekharan, Sreepradha; Panda, Rames Chandra; Swaminathan, Bhuvaneswari Natrajan

    2017-06-01

    The coal fired thermal power plants plays major role in the power production in the world as they are available in abundance. Many of the existing power plants are based on the subcritical technology which can produce power with the efficiency of around 33%. But the newer plants are built on either supercritical or ultra-supercritical technology whose efficiency can be up to 50%. Main objective of the work is to enhance the efficiency of the existing subcritical power plants to compensate for the increasing demand. For achieving the objective, the statistical modeling of the boiler units such as economizer, drum and the superheater are initially carried out. The effectiveness of the developed models is tested using analysis methods like R 2 analysis and ANOVA (Analysis of Variance). The dependability of the process variable (temperature) on different manipulated variables is analyzed in the paper. Validations of the model are provided with their error analysis. Response surface methodology (RSM) supported by DOE (design of experiments) are implemented to optimize the operating parameters. Individual models along with the integrated model are used to study and design the predictive control of the coal-fired thermal power plant.

  17. Nuclear and coal-fired power plant capital costs 1978 -June 1981

    International Nuclear Information System (INIS)

    Harbour, R.T.

    1981-07-01

    This bibliography covers 16 papers dealing with the economics of power generation - mainly comparisons between the capital costs of nuclear and coal fired plants. Some of the papers additionally discuss fuel, operating and maintenance costs, and performance. (U.K.)

  18. Pilot plant study

    International Nuclear Information System (INIS)

    Morris, M.E.

    1978-01-01

    Sandia Laboratories undertook the design and fabrication of an 8 ton/day dry sewage sludge irradiatior. The facility is intended (1) to function as a high-gamma-dose rate research facility; (2) to be a testbed for the unique electrical and mechanical components to be used in larger facilities; (3) to fulfill the formal requirements of a pilot plant so that design and construction of a demonstration facility could proceed; and (4) to provide accurate data base on construction and operating experience for the Environmental Impact Assessment (EIA), the Safety Analysis Report (SAR), and the cost analyses for a larger facility. The facility and its component systems are described in detail

  19. South Blackwater Coal`s maintenance program

    Energy Technology Data Exchange (ETDEWEB)

    Nash, J. [South Blackwater Coal Limited, Blackwater, Qld. (Australia)

    1998-09-01

    The South Blackwater operation consists of two opencut mining areas and two underground mines (Laleham and Kenmure) near Blackwater in central Queensland, all of which supply coal to a central coal preparation plant. South Blackwater Coal Ltd. recently developed a maintenance improvement programme, described in this article. The programme involved implementation systems of key performance indicators (KPIs), benchmaking, condition monitoring, work planning and control, failure analysis and maintenance audit. Some improvements became almost immediately apparent, others were quite gradual. Major results included: improved availability (and reliability) of all opencast fleets, improvements in rear dump availability; reduced maintenance man-hours for opencast fleets; and increased availability of the coal handling and preparation plant. The paper is an edited version of that presented at the `Maintenance in mining conference` 16-19 March 1998, held in Bali, Indonesia. 4 figs., 2 photos.

  20. Constructing a sustainable power sector in China: current and future emissions of coal-fired power plants from 2010 to 2030

    Science.gov (United States)

    Tong, D.; Zhang, Q.

    2017-12-01

    As the largest energy infrastructure in China, power sector consumed more coal than any other sector and threatened air quality and greenhouse gas (GHG) abatement target. In this work, we assessed the evolution of coal-fired power plants in China during 2010-2030 and the evolution of associated emissions for the same period by using a unit-based emission projection model which integrated the historical power plants information, turnover of the future power plant fleet, and the evolution of end-of-pipe control technologies. We found that, driven by the stringent environmental legislation, SO2, NOx, and PM2.5 emissions from China's coal-fired power plants decreased by 49%, 45%, and 24% respectively during 2010-2015, comparing to 14% increase of coal consumption and 15% increase in CO2 emissions. We estimated that under current national energy development planning, coal consumption and CO2 emissions from coal-fired power plants will continue to increase until 2030, in which against the China's Intended Nationally Determined Contributions (INDCs) targets. Early retirement of old and low-efficient power plants will cumulatively reduce 2.2 Pg CO2 emissions from the baseline scenario during 2016-2030, but still could not curb CO2 emissions from the peak before 2030. Owing to the implementation of "near zero" emission control policy, we projected that emissions of air pollutants will significantly decrease during the same period under all scenarios, indicating the decoupling trends of air pollutants and CO2 emissions. Although with limited direct emission reduction benefits, increasing operating hours of power plants could avoid 236 GW of new power plants construction, which could indirectly reduce emissions embodied in the construction activity. Our results identified a more sustainable pathway for China's coal-fired power plants, which could reduce air pollutant emissions, improve the energy efficiency, and slow down the construction of new units. However, continuous

  1. Superacid Catalyzed Depolymerization and Conversion of Coals. Final Technical Report. [HF:BF{sub 2}/H{sub 2}

    Science.gov (United States)

    Olah, G.

    1980-01-01

    We were interested in applying superacid catalyzed cleavage-depolymerization and ionic hydrogenation low temperature conversion of coal to liquid hydrocarbon, as well as obtaining information about the reactions involved and the structure of intermediates of the coal liquefaction process. In order to show the feasibility of our proposed research we have carried out preliminary investigation in these areas. Preceding our work there was no practical application of a superacid system to coal liquefaction. We carried out an extensive study of the potential of the HF:BF{sub 3}/H{sub 2} system for coal hydroliquefaction. Under varying conditions of reactant ratio, reaction time and temperature, we were able to obtain over 95% pyridine extractible product by treating coal in HF:BF{sub 3}:H{sub 2} system at approx. 100 degrees C for 4 hours. The coal to acid ratio was 1:5 and FB{sub 3} at 900 psi and H{sub 2} at 500 psi were used. These are extremely encouraging results in that the conditions used are drastically milder than those used in any known process, such as Exxon donor solvent and related processes. The cyclohexane extractibility of the treated coal was as high as 27% and the yield of liquid distillate at 400 degrees C/5 x 10{sup -3}/sup torr/ was approx. 30%. The infrared spectrum of product coal, extracts and distillates were distinctly different from the starting coal and show a significant increase in the amount of saturates. The {sup 1}H NMR spectrum of cyclohexane extract of the treated coal shows essentially all aliphatic photons. The spectra of other treated coal extracts show increased amounts and types of aliphatic protons as well as significant amounts of protons bound to unsaturated sites. This again indicates that the HF-BF{sub 3} system is depolymerizing the coal to small fragments which are soluble in non-polar solvents.

  2. Natural radionuclides from the coal in atmospheric environment of the coal fired power plants

    International Nuclear Information System (INIS)

    Antic, D.; Kostic-Soskic, M.; Milovanovic, S.; Telenta, B.

    1995-01-01

    The inhalation radiation exposure of the public in the vicinity of the selected coal fired power plants near from Belgrade (30-50 km) has been studied, using a set of data for natural radionuclides from the analysed power plants. A generalised model for analysis of radiological impact of an energy source, that includes the two-dimensional version of the cloud model, has been used for simulation of the transport of radionuclides released to the atmosphere. The inhalation dose rates for an adult are assessed and analysed during fast changeable meteorological conditions. A set of realistic meteorological conditions (wind, radiosonde sounding temperature, pressure, and humidity data) has been used for the numerical simulations. (author)

  3. Value of forestation in absorbing carbon dioxide surrounding a coal fired power plant

    Energy Technology Data Exchange (ETDEWEB)

    Dang, V.D.; Steinberg, M.

    1980-08-01

    The dispersion of carbon dioxide emitted from 1000 MW(e) coal fired power plant is investigated. Calculated ground level carbon dioxide concentrations as a function of distance from the power plant stack is validated by the results derived from sulfur dioxide dispersion measurements. Forestation is examined as a means for removal and control of atmospheric carbon dioxide at a distance of 5 to 10 km away from the power plant stack. An equilibrium and a dynamic approach are considered. For an average temperate zone forest growth rate (7.42 mg/dm/sup 2/ h), the overall reduction in forested land area required to remove the equivalent of all of the CO/sub 2/ from a 1000 MW(e) power plant would be less than 3.3% compared to removing the equivalent amount of CO/sub 2/ by planting forests remotely from the plant. If faster growing tropical plants or trees having up to 4 times the temperate plant growth rate were used, there would be a maximum savings of 15% in forested land area compared to a remote planting. This magnitude of reduction in cultivated forest area is insufficient to recommend planting forested areas adjacent to central power stations as a means of controlling CO/sub 2/ emission. Rather it is suggested to provide sufficient increased regional forested areas on a global scale for the purposes of absorbing the equivalent increase in CO/sub 2/ emission due to increased fossil fuel use.

  4. Radiological control in a mine with a naturally occurring radioactive material - NORM: II assessment of external exposition in a pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, W.S.; Py Junior, D.A.; Silva, A.C.A.; Garcia Filho, O., E-mail: pereiraws@gmail.com [Industrias Nucleares do Brasil (INB), Pocos de Caldas, MG (Brazil). Unidade de Tratamento de Minerio. Grupo Multidisciplinar de Radioprotecao; Kelecom, A., E-mail: akelecom@id.uff.br [Universidade Federal Fluminense (LARARA-PLS/GETA/UFF), Niteroi, RJ (Brazil). Laboratorio de Radiobiologia e Radiometria Pedro Lopes dos Santos. Grupo de Estudos em Temas Ambientais; Pereira, J.R.S., E-mail: pereirarsj@gmail.com [Universidade Federal de Alfenas (UNIFAL), Pocos de Caldas, MG (Brazil)

    2013-07-01

    In the year of 2009, a pilot plant for uranium extraction from a phosphate mine to be installed at Santa Quiteria city, Ceara state, Brazil was carried out at the Ore Treatment Unit (OTU). During the operation of the pilot plant, the monitoring of external exposure in the area used by the pilot plant was conducted. 157 measurements were taken saving the data of the exposure rate and converting them to external dose. The background (BG) of the area was measured before the beginning of the operation and was estimated as 0.340 μSv h{sup -1}; only two measurements, out of the 157, were below the BG. The dose rates varied from 0.304 μSv h{sup -1} to 0.814 μSv h{sup -1}, with an average equal to 0.544 μSv h{sup -1}. When the results were compared to the derived limit for member of the public, which is equal to μSv h{sup -1}, approximately 38 % of the results were below this limit. Approximately 50 % of the results were below 0.554 μSv h{sup -1} and approximately 95 % of the results were below 0.754 μSv h{sup -1}. By this criterion only, the area must be considered as a supervised area. In order to classify the area in definitive, the internal exposure must also be evaluated. In this installation significant internal doses are not to be expected, considering that most part of the process is conducted by a wet route, without dust or aerosol generation, that when inhaled should create internal doses. (author)

  5. Japan`s New Sunshine Project. 20. 1995 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The paper described a summary of the 1995 study on coal liquefaction and gasification under the New Sunshine Project. As for coal liquefaction, a study was made of liquefaction characteristics and catalysts of various coals. Also studied were liquefaction conditions for quality improvement of liquefaction products, an evaluation method of quality of coal liquid, and a utilization method of coal liquid. In order to prevent carbonization and realize effective liquefaction, a study was conducted for elucidation of the reaction mechanism of high pressure hydrogenation. In a 150t/d pilot plant using hydrogen transfer hydrogenation solvents, the NEDOL method was studied using various catalysts and kinds of coals. This is a step prior to data acquisition for engineering, actual construction of equipment and operation. A 1t/d process supporting unit is a unit to support it. The unit conducts studies on slurry letdown valves and synthetic iron sulfide catalysts, screening of Chinese coals, etc. As to coal gasification, the paper added to the basic research the combined cycle power generation using entrained flow coal gasification for improvement of thermal efficiency and environmental acceptability and the HYCOL method for hydrogen production. 68 refs., 40 figs.

  6. Summary of uranium refining and conversion pilot plant at Ningyo-toge works

    International Nuclear Information System (INIS)

    Iwata, Ichiro

    1981-01-01

    In the Ningyo-toge works, Power Reactor and Nuclear Fuel Development Corp., the construction of the uranium refining and conversion pilot plant was completed, and the operation will be started after the various tests based on the related laws. As for the uranium refining in Japan, the PNC process by wet refining method has been developed since 1958. The history of the development is described. It was decided to construct the refining and conversion pilot plant with 200 t uranium/year capacity as the comprehensive result of the development. This is the amount sufficient to supply UF 6 to the uranium enrichment pilot plant in Ningyo-toge. The building for the refining and conversion pilot plant is a three-story ferro-concrete building with the total floor area of about 13,000 m 2 . The raw materials are the uranium ore produced in Ningyo-toge and the yellow cakes from abroad. Uranyl sulfate solution is obtained by solvent extraction using an extraction tower or a mixer-settler. The following processes are electrolytic reduction, precipitation of uranium tetrafluoride, filtration, drying, dehydration and UF 6 conversion. The fluorine for UF 6 conversion is produced by the facility in the plant. The operation of the pilot plant will be started in the latter half of the fiscal year 1981, the batch operation is carrried out in 1982, and the continuous operation from 1983. (Kako, I.)

  7. FGD Franchising Pilot Project of Thermal Power Plants

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At...

  8. Scrubbing system design for CO{sub 2} capture in coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Heischkamp, Elizabeth

    2017-07-01

    Within the last decades a continuous tightening of environmental regulations has been observed in several countries around the world. These include restriction of anthropogenic CO{sub 2} emissions, since they are considered responsible for intensifying global warming. Coal-fired power plants represent a good possibility for capturing CO{sub 2} before it is emitted in the atmosphere, thereby contributing to combat global warming. This work focuses on reducing the CO{sub 2} emissions of such a power plant by 90 %. For this purpose a hard coal power plant is retrofitted with a chemical absorption using different solutions of piperazine promoted potassium carbonate. The resulting power plant's efficiency losses have been accounted for. A comparison of different scenarios such as the variation of operating parameters offer an insight in detecting suitable operating conditions that will allow to minimize efficiency penalties. Simulation details are provided along with a technical and an economic analysis.

  9. Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

  10. Characteristics of carbonized sludge for co-combustion in pulverized coal power plants

    International Nuclear Information System (INIS)

    Park, Sang-Woo; Jang, Cheol-Hyeon

    2011-01-01

    Co-combustion of sewage sludge can destabilize its combustion profile due to high volatility, which results in unstable flame. We carried out fuel reforming for sewage sludge by way of carbonization at pyrolysis temperature of 300-500 deg. C. Fuel characteristics of carbonized sludge at each temperature were analyzed. As carbonization temperature increased, fuel ratio increased, volatile content reduced, and atomic ratio relation of H/C and O/C was similar to that of lignite. The analysis result of FT-IR showed the decrease of aliphatic C-H bond and O-C bond in carbonization. In the analysis result of TG-DTG, the thermogravimetry reduction temperature of carbonized sludge (CS400) was proven to be higher than that of dried sludge, but lower than that of sub-bituminous coal. Hardgrove grindability index increased in proportion to fuel ratio increase, where the carbonized sludge value of 43-110 was similar or higher than the coal value of 49-63. As for ash deposits, slagging and fouling index were higher than that of coal. When carbonized sludge (CS400) and coal were co-combusted in 1-10% according to calorific value, slagging tendency was low in all conditions, and fouling tendency was medium or high according to the compositions of coal.

  11. Conceptual designs of pressurized fluidized bed and pulverized coal fired power plants

    International Nuclear Information System (INIS)

    Doss, H.S.; Bezella, W.A.; Hamm, J.R.; Pietruszkiewicz, J.

    1984-01-01

    This paper presents the major technical and economic characteristics of steam and air-cooled pressurized fluidized bed (PFB) power plant concepts, along with the characteristics of a pulverized coal fired power plant equipped with an adipic acid enhanced wet-limestone flue gas desulfurization system. Conceptual designs for the three plants were prepared to satisfy a set of common groundrules developed for the study. Grassroots plants, located on a generic plant site were assumed. The designs incorporate technologies projected to be commercial in the 1990 time frame. Power outputs, heat rates, and costs are presented

  12. Analysis of radioactivity concentration in naturally occurring radioactive materials used in coal-fired plants in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Geom; Kim, Si Young; Ji, Seung Woo; Park, Il; Kim, Min Jun; Kim, Kwang Pyo [Dept. of Nuclear Engineering, Kyung Hee University, Yongin (Korea, Republic of)

    2017-02-15

    Coals and coal ashes, raw materials and by-products, in coal-fired power plants contain naturally occurring radioactive materials (NORM). They may give rise to internal exposure to workers due to inhalation of airborne particulates containing radioactive materials. It is necessary to characterize radioactivity concentrations of the materials for assessment of radiation dose to the workers. The objective of the present study was to analyze radioactivity concentrations of coals and by-products at four coal-fired plants in Korea. High purity germanium detector was employed for analysis of uranium series, thorium series, and potassium 40 in the materials. Radioactivity concentrations of {sup 226}Ra, {sup 228}Ra, and {sup 40}K were 2⁓53 Bq kg{sup -1}, 3⁓64 Bq kg{sup -1}, and 14⁓431 Bq kg{sup -1} respectively in coal samples. For coal ashes, the radioactivity concentrations were 77⁓133 Bq kg{sup -1}, 77⁓105 Bq kg{sup -1}, and 252⁓372 Bq kg{sup -1} in fly ash samples and 54⁓91 Bq kg{sup -1}, 46⁓83 Bq kg{sup -1}, and 205⁓462 Bq kg{sup -1} in bottom ash samples. For flue gas desulfurization (FGD) gypsum, the radioactivity concentrations were 3⁓5 Bq kg{sup -1}, 2⁓3 Bq kg{sup -1}, and 22⁓47 Bq kg{sup -1}. Radioactivity was enhanced in coal ash compared with coal due to combustion of organic matters in the coal. Radioactivity enhancement factors for {sup 226}Ra, {sup 228}Ra, and {sup 40}K were 2.1⁓11.3, 2.0⁓13.1, and 1.4⁓7.4 for fly ash and 2.0⁓9.2, 2.0⁓10.0, 1.9⁓7.7 for bottom ash. The database established in this study can be used as basic data for internal dose assessment of workers at coal-fred power plants. In addition, the findings can be used as a basic data for development of safety standard and guide of Natural Radiation Safety Management Act.

  13. Operation of a cell feeder for coal controlled by a frequency converter. [Czechoslovakia

    Energy Technology Data Exchange (ETDEWEB)

    Stonawski, J; Sikora, G

    1984-02-01

    Steam boiler of the Trinec coal-fired power plant with a capacity of 125 t/h, 545 C, 9.5 MPa was equipped with a screw coal feeder with the KT26A-6 Winter-Eichberg motor with a transformer. The screw fee

  14. Complex analysis of hazards to the man and natural environment due to electricity production in nuclear and coal power plants

    International Nuclear Information System (INIS)

    Strupczewski, A.

    1990-01-01

    The report presents a complex analysis of hazards connected with electrical energy production in nuclear power plants and coal power plants, starting with fuel mining, through power plant construction, operation, possible accidents and decommissioning to long term global effects. The comparison is based on contemporary, proven technologies of coal fired power plants and nuclear power plants with pressurized water reactors. The hazards to environment and man due to nuclear power are shown to be much smaller than those due to coal power cycle. The health benefits due to electrical power availability are shown to be much larger than the health losses due to its production. (author). 71 refs, 17 figs, 12 tabs

  15. Pilot plant of continuous ion-exchange in fluidized bed

    International Nuclear Information System (INIS)

    Botella, T.; Otero de Becerra, J.; Gasos, P.

    1985-01-01

    Research and development on continuous ion-exchange processes has been a major item in hydrometallurgy. This new technology has been under development during the last 15 years in the leading countries at uranium hydrometallurgy. The fluidized bed multi-stage column technique is proven to be the most attractive one, and since 1977 several commercial plants have begun production, some of them with a throughput of 500 cubic meters of pregnant liquour per hour. J.E.N. undertook the study of this new technology for uranium recovery in the early 70's. In 1979 a pilot plant had been installed, based on previous laboratory and smaller pilot plant experience. The plant was designed following JEN's own technology and has been operating successfully at a flow rate of near 0.5 cubic meters per hour. The test runs and the main processing, engineering and operation features are described. At present a demonstation plant is under design, and this installation will provide the necessary know-how for the construction and operation of a commercial scale plant. (author)

  16. Prospects for pilot plants based on the tokamak, spherical tokamak and stellarator

    International Nuclear Information System (INIS)

    Menard, J.E.; Bromberg, L.; Brown, T.; Burgess, Thomas W.; Dix, D.; Gerrity, T.; Goldston, R.J.; Hawryluk, R.; Kastner, R.; Kessel, C.; Malang, S.; Minervini, J.; Neilson, G.H.; Neumeyer, C.L.; Prager, S.; Sawan, M.; Sheffield, J.; Sternlieb, A.; Waganer, L.; Whyte, D.G.; Zarnstorff, M.C.

    2011-01-01

    A potentially attractive next-step towards fusion commercialization is a pilot plant, i.e. a device ultimately capable of small net electricity production in as compact a facility as possible and in a configuration scalable to a full-size power plant. A key capability for a pilot-plant programme is the production of high neutron fluence enabling fusion nuclear science and technology (FNST) research. It is found that for physics and technology assumptions between those assumed for ITER and nth-of-a-kind fusion power plant, it is possible to provide FNST-relevant neutron wall loading in pilot devices. Thus, it may be possible to utilize a single facility to perform FNST research utilizing reactor-relevant plasma, blanket, coil and auxiliary systems and maintenance schemes while also targeting net electricity production. In this paper three configurations for a pilot plant are considered: the advanced tokamak, spherical tokamak and compact stellarator. A range of configuration issues is considered including: radial build and blanket design, magnet systems, maintenance schemes, tritium consumption and self-sufficiency, physics scenarios and a brief assessment of research needs for the configurations.

  17. Application of Coal Thermal Treatment Technology for Oil-Free Firing of Boilers

    Science.gov (United States)

    Aliyarov, B.; Mergalimova, A.; Zhalmagambetova, U.

    2018-04-01

    The theoretical and practical introduction of this kind of firing boiler units in coal thermal power plants is considered in the article. The results of an experimental study of three types of coals are presented in order to obtain the required gaseous fuel. The aim of the study is to develop a new, economically and ecologically more acceptable method for firing boilers at thermal power plants, which is able to exclude the use of expensive and inconvenient fuel oil. The tasks of the experiment are to develop a technological scheme of kindling of boilers at thermal power plants, using as a type of ignition fuel volatile combustible substances released during the heating of coal, and to investigate three types of coal for the suitability of obtaining gaseous fuels, in sufficient volume and with the required heat of combustion. The research methods include the analysis of technical and scientific-methodological literature on the problem of the present study, the study of the experience of scientists of other countries, the full-scale experiment on the production of volatile combustible substances. During the full-scale experiment, the coal of 3 fields of Kazakhstan has been studied: Shubarkul, Maikuben and Saryadyr. The analysis has been performed and the choice of the most convenient technology for boiler kindling and maintenance of steady burning of the torch has been made according to the proposed method, as well as the corresponding technological scheme has been developed. As a result of the experiment, it can be stated that from coal in the process of its heating (without access to oxygen), it is possible to obtain a sufficient amount of combustible volatile substances. The released gaseous fuel has the necessary parameters and is quite capable of replacing an expensive fuel oil. The resulting gaseous fuel is quite convenient to use and environmentally cleaner. The piloting scheme developed as a result of the experiment can be introduced in pulverized-coal

  18. Capacity modelling of the coal value chain at Sasol Coal Supply

    CSIR Research Space (South Africa)

    Harmse, M

    2007-05-01

    Full Text Available plants. The plants must be supplied with adequate coal to sustain production. A simulation model was built to test the feasibility of blending the coal from the mines according to a weekly blend plan....

  19. Electroosmotically enhanced sludge dewatering-pilot-plant study

    CSIR Research Space (South Africa)

    Smollen, M

    1994-01-01

    Full Text Available role in determining the ease or difficulty of phase separation. It seems that the inefficiency of dewatering applied to gelatinous and fine-particle sludges can be overcome by mechanical dewatering enhanced by electroosmosis. A prototype pilot-plant...

  20. Design of a uranium recovery pilot plant

    International Nuclear Information System (INIS)

    1984-01-01

    The engineering design of a pilot plant of uranium recover, is presented. The diagrams and specifications of the equipments such as pipelines, pumps, values tanks, filters, engines, etc... as well as metallic structure and architetonic design is also presented. (author)

  1. Comparison of environmental impact of waste disposal from fusion, fission and coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Frey, Bruno [Fichtner GmbH und Co. KG, Stuttgart (Germany)

    2011-08-15

    The radiotoxic hazard of waste from fusion power plants has been compared with that of fission power and radioactive trace elements in coal ash within some research programs such as SEAFP and SEIF. Within another program, in 2005 a Power Plant Conceptual Study (PPCS) has been finalized investigating 4 fusion power plant models A to D. In this paper, the radiotoxicity of model B is compared with a fission power plant, concentrating on the production of wastes. The hazard of the respective masses of enriched uranium before use in a fission power plant and coal ash of a power plant generating the same amount of electricity are used as benchmarks. It is evident that the development of ingestion and inhalation hazard of the PPCS model B is different from the results of earlier studies because of different assumptions on material impurities and other constraints. An important aspect is the presence of actinides in fusion power plant waste. (orig.)

  2. Do emission ceilings ruin coal-fired power plants?; Emissieplafonds nekken kolencentrales?

    Energy Technology Data Exchange (ETDEWEB)

    Wijmenga, J. [Ministerie van Infrastructuur en Milieu, Den Haag (Netherlands)

    2011-04-15

    The case of the new coal-fired power plants has already racked the brains of many. The advice offered to the court by the attorney-general constitutes the next step in this process. A temporary solution has been found for the coal-fired plants, but one question remains unanswered so far: how should an emission ceiling be used as a test instrument for permits? This article provides a direction in which a solution can be found. [Dutch] De zaak betreffende de nieuwe kolencentrales heeft al tot heel wat hoofdbrekens geleid. Het advies dat de advocaat-generaal heeft uitgebracht aan het hof is een volgende stap in dit proces. Voor de kolencentrales is een tijdelijke oplossing gevonden, maar de vraag is nog niet beantwoord hoe een emissieplafond moet worden gebruikt als toetsinstrument voor vergunningen. In dit artikel wordt aangegeven in welke richting een oplossing kan worden gezocht.

  3. Power Generation from Coal 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Coal is the biggest single source of energy for electricity production and its share is growing. The efficiency of converting coal into electricity matters: more efficient power plants use less fuel and emit less climate-damaging carbon dioxide. This book explores how efficiency is measured and reported at coal-fired power plants. With many different methods used to express efficiency performance, it is often difficult to compare plants, even before accounting for any fixed constraints such as coal quality and cooling-water temperature. Practical guidelines are presented that allow the efficiency and emissions of any plant to be reported on a common basis and compared against best practice. A global database of plant performance is proposed that would allow under-performing plants to be identified for improvement. Armed with this information, policy makers would be in a better position to monitor and, if necessary, regulate how coal is used for power generation. The tools and techniques described will be of value to anyone with an interest in the more sustainable use of coal.

  4. Sustainable development with clean coal

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    This paper discusses the opportunities available with clean coal technologies. Applications include new power plants, retrofitting and repowering of existing power plants, steelmaking, cement making, paper manufacturing, cogeneration facilities, and district heating plants. An appendix describes the clean coal technologies. These include coal preparation (physical cleaning, low-rank upgrading, bituminous coal preparation); combustion technologies (fluidized-bed combustion and NOx control); post-combustion cleaning (particulate control, sulfur dioxide control, nitrogen oxide control); and conversion with the integrated gasification combined cycle.

  5. Thermodynamic analysis and conceptual design for partial coal gasification air preheating coal-fired combined cycle

    Science.gov (United States)

    Xu, Yue; Wu, Yining; Deng, Shimin; Wei, Shirang

    2004-02-01

    The partial coal gasification air pre-heating coal-fired combined cycle (PGACC) is a cleaning coal power system, which integrates the coal gasification technology, circulating fluidized bed technology, and combined cycle technology. It has high efficiency and simple construction, and is a new selection of the cleaning coal power systems. A thermodynamic analysis of the PGACC is carried out. The effects of coal gasifying rate, pre-heating air temperature, and coal gas temperature on the performances of the power system are studied. In order to repower the power plant rated 100 MW by using the PGACC, a conceptual design is suggested. The computational results show that the PGACC is feasible for modernizing the old steam power plants and building the new cleaning power plants.

  6. Review of the coal-fired, over-supercritical and ultra-supercritical steam power plants

    Science.gov (United States)

    Tumanovskii, A. G.; Shvarts, A. L.; Somova, E. V.; Verbovetskii, E. Kh.; Avrutskii, G. D.; Ermakova, S. V.; Kalugin, R. N.; Lazarev, M. V.

    2017-02-01

    The article presents a review of developments of modern high-capacity coal-fired over-supercritical (OSC) and ultra-supercritical (USC) steam power plants and their implementation. The basic engineering solutions are reported that ensure the reliability, economic performance, and low atmospheric pollution levels. The net efficiency of the power plants is increased by optimizing the heat balance, improving the primary and auxiliary equipment, and, which is the main thing, by increasing the throttle conditions. As a result of the enhanced efficiency, emissions of hazardous substances into the atmosphere, including carbon dioxide, the "greenhouse" gas, are reduced. To date, the exhaust steam conditions in the world power industry are p 0 ≈ 30 MPa and t 0 = 610/620°C. The efficiency of such power plants reaches 47%. The OSC plants are being operated in Germany, Denmark, Japan, China, and Korea; pilot plants are being developed in Russia. Currently, a project of a power plant for the ultra-supercritical steam conditions p 0 ≈ 35 MPa and t 0 = 700/720°C with efficiency of approximately 50% is being studied in the EU within the framework of the Thermie AD700 program, project AD 700PF. Investigations in this field have also been launched in the United States, Japan, and China. Engineering solutions are also being sought in Russia by the All-Russia Thermal Engineering Research Institute (VTI) and the Moscow Power Engineering Institute. The stated steam parameter level necessitates application of new materials, namely, nickel-base alloys. Taking into consideration high costs of nickel-base alloys and the absence in Russia of technologies for their production and manufacture of products from these materials for steam-turbine power plants, the development of power plants for steam parameters of 32 MPa and 650/650°C should be considered to be the first stage in creating the USC plants as, to achieve the above parameters, no expensive alloys are require. To develop and

  7. Analysis of mercury in rock varnish samples in areas impacted by coal-fired power plants

    International Nuclear Information System (INIS)

    Nowinski, Piotr; Hodge, Vernon F.; Gerstenberger, Shawn; Cizdziel, James V.

    2013-01-01

    Rock varnish is a manganese–iron rich coating that forms on rocks, most often in arid climates. To assess its utility as an environmental monitor of mercury contamination, cold vapor atomic absorption spectrometry (CVAAS) was used for analysis. Samples were collected in the fallout patterns of two coal-fired power plants in southern Nevada: the defunct Mohave Power Plant (MPP) and the operating Reid Gardner Power Plant (RGPP). The resultant Hg concentrations in rock varnishes were plotted as a function of the distance from each power plant. The highest concentrations of Hg occurred at locations that suggest the power plants are the main source of pollutants. In addition, past tracer plume studies carried out at MPP show that the highest tracer concentrations coincide with the highest rock varnish Hg concentrations. However, additional samples are required to further demonstrate that power plants are indeed the sources of mercury in varnishes. -- Highlights: •We analyze desert varnish samples collected in the fallout patterns of two coal-fired and analyzed for Hg by CVAA. •The resultant Hg concentrations in the desert varnish samples were plotted as a function of the distance from each power plant. •The highest concentrations of Hg occurred at locations that suggest the power plants are the main source of pollutants. •Data indicate the utility of desert varnish as a passive environmental monitor for Hg atmospheric pollution. -- Cold vapor atomic absorption spectrometry (CVAAS) was used for analysis of mercury in varnished rocks collected in the fallout zones of two coal-fired power plants

  8. Coal 99; Kol 99

    Energy Technology Data Exchange (ETDEWEB)

    Sparre, C

    2000-07-01

    The following report deals with the use of coal and coke during 1998. Some information about techniques, environmental questions and markets are also given. Data have been collected by questionnaires to major users and by telephone to minor users. Preliminary statistical data from Statistics Sweden have also been used. The use of steam coal for heating purposes during 1998 was 680 000 tons and somewhat lower than in 1997. The extremely high figures of 1996 were due to twice the production of electricity because of lack of waterpower. The co-generation plants were the main users of coal. The minor plants have increased their use of forest fuels. Probably the use of steam coal will go down in the immediate years both in the heat generating and the co-generating plants. During the top year 1987 coal was used in 18 hot water plants and 11 co-generation plants. During 1998 these figures are 1 and 8. Taxes and environmental reasons explain this trend. The use of steam coal in the industry has been constant at the level 700 000 tons. This level is supposed to be constant or to vary with business cycles. Steel-works, however, increase their use of steam coal in order to replace the more expensive coke. The import of metallurgical coal in 1998 was 1.6 mill tons like the year before. 1.1 mill tons of coke were produced. The coke consumption in the industry was 1.4 mill tons from which 0.3 mill tons were imported. Several other plants have plans to replace the coal with forest fuels, waste fuels and NG. Even the biggest plant, Vaesteraas, has ordered a block for bio fuels. Helsingborg has started to use wood pellets. The pellets replace most of the coal for the heat production in the co-generation plant. Norrkoeping Kraft AB has put a fluid bed boiler for various fuels into operation, leading to more than half the coal consumption compared with previous years. They have also rebuilt one of their travelling grates for bio fuels. Stockholm Energi, Haesselbyverket, has invested

  9. New coal

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    Specially dedicated to coal, this edition comprises a series of articles of general interest dealing with the position of the French coalmining industry (interview with M.P. Gardent), the coal market in France, the work of CERCHAR, etc. New techniques, in-situ gasification of deep coal, gasification of coal by nuclear methods, the conversion of coal into petrol, the Emile Huchet power plant of Houilleres du Bassin de Lorraine, etc., are dealt with.

  10. The shell coal gasification process

    Energy Technology Data Exchange (ETDEWEB)

    Koenders, L.O.M.; Zuideveld, P.O. [Shell Internationale Petroleum Maatschappij B.V., The Hague (Netherlands)

    1995-12-01

    Future Integrated Coal Gasification Combined Cycle (ICGCC) power plants will have superior environmental performance and efficiency. The Shell Coal Gasification Process (SCGP) is a clean coal technology, which can convert a wide range of coals into clean syngas for high efficiency electricity generation in an ICGCC plant. SCGP flexibility has been demonstrated for high-rank bituminous coals to low rank lignites and petroleum coke, and the process is well suited for combined cycle power generation, resulting in efficiencies of 42 to 46% (LHV), depending on choice of coal and gas turbine efficiency. In the Netherlands, a 250 MWe coal gasification combined cycle plant based on Shell technology has been built by Demkolec, a development partnership of the Dutch Electricity Generating Board (N.V. Sep). The construction of the unit was completed end 1993 and is now followed by start-up and a 3 year demonstration period, after that the plant will be part of the Dutch electricity generating system.

  11. H-coal fluid dynamics. Final report, August 1, 1977-December 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-16

    This report presents the results of work aimed at understanding the hydrodynamic behavior of the H-Coal reactor. A summary of the literature search related to the fluid dynamic behavior of gas/liquid/solid systems has been presented. Design details of a cold flow unit were discussed. The process design of this cold flow model followed practices established by HRI in their process development unit. The cold fow unit has been used to conduct experiments with nitrogen, kerosene, or kerosene/coal char slurries, and HDS catalyst, which at room temperature have properties similar to those existing in the H-Coal reactor. Mineral oil, a high-viscosity liquid, was also used. The volume fractions occupied by gas/liquid slurries and catalyst particles were determined by several experimental techniques. The use of a mini-computer for data collection and calculation has greatly accelerated the analysis and reporting of data. Data on nitrogen/kerosene/HDS catalyst and coal char fines are presented in this paper. Correlations identified in the literature search were utilized to analyze the data. From this analysis it became evident that the Richardson-Zaki correlation describes the effect of slurry flow rate on catalyst expansion. Three-phase fluidization data were analyzed with two models.

  12. Coal; Le charbon

    Energy Technology Data Exchange (ETDEWEB)

    Teissie, J.; Bourgogne, D. de; Bautin, F. [TotalFinaElf, La Defense, 92 - Courbevoie (France)

    2001-12-15

    Coal world production represents 3.5 billions of tons, plus 900 millions of tons of lignite. 50% of coal is used for power generation, 16% by steel making industry, 5% by cement plants, and 29% for space heating and by other industries like carbo-chemistry. Coal reserves are enormous, about 1000 billions of tons (i.e. 250 years of consumption with the present day rate) but their exploitation will be in competition with less costly and less polluting energy sources. This documents treats of all aspects of coal: origin, composition, calorific value, classification, resources, reserves, production, international trade, sectoral consumption, cost, retail price, safety aspects of coal mining, environmental impacts (solid and gaseous effluents), different technologies of coal-fired power plants and their relative efficiency, alternative solutions for the recovery of coal energy (fuel cells, liquefaction). (J.S.)

  13. Radiological Impact Associated to Technologically Enhanced Naturally Occurring Radioactive Materials (TENORM) from Coal-Fired Power Plants Emissions - 13436

    International Nuclear Information System (INIS)

    Dinis, Maria de Lurdes; Fiuza, Antonio; Soeiro de Carvalho, Jose; Gois, Joaquim; Meira Castro, Ana Cristina

    2013-01-01

    Certain materials used and produced in a wide range of non-nuclear industries contain enhanced activity concentrations of natural radionuclides. In particular, electricity production from coal is one of the major sources of increased human exposure to naturally occurring radioactive materials. A methodology was developed to assess the radiological impact due to natural radiation background. The developed research was applied to a specific case study, the Sines coal-fired power plant, located in the southwest coastline of Portugal. Gamma radiation measurements were carried out with two different instruments: a sodium iodide scintillation detector counter (SPP2 NF, Saphymo) and a gamma ray spectrometer with energy discrimination (Falcon 5000, Canberra). Two circular survey areas were defined within 20 km of the power plant. Forty relevant measurements points were established within the sampling area: 15 urban and 25 suburban locations. Additionally, ten more measurements points were defined, mostly at the 20-km area. The registered gamma radiation varies from 20 to 98.33 counts per seconds (c.p.s.) corresponding to an external gamma exposure rate variable between 87.70 and 431.19 nGy/h. The highest values were measured at locations near the power plant and those located in an area within the 6 and 20 km from the stacks. In situ gamma radiation measurements with energy discrimination identified natural emitting nuclides as well as their decay products (Pb-212, Pb-2142, Ra-226, Th-232, Ac-228, Th-234, Pa-234, U- 235, etc.). According to the results, an influence from the stacks emissions has been identified both qualitatively and quantitatively. The developed methodology accomplished the lack of data in what concerns to radiation rate in the vicinity of Sines coal-fired power plant and consequently the resulting exposure to the nearby population. (authors)

  14. Wood and coal cofiring in Alaska—operational considerations and combustion gas effects for a grate-fired power plant

    Science.gov (United States)

    David Nicholls; Zackery Wright; Daisy. Huang

    2018-01-01

    Coal is the primary fuel source for electrical power generation in interior Alaska, with more than 600,000 tons burned annually at five different power plants. Woody biomass could be used as part of this fuel mix, offering potential environmental and economic benefits. In this research, debarked chips were cofired with locally mined coal at the Aurora Power Plant...

  15. Coal-water slurry fuel internal combustion engine and method for operating same

    Science.gov (United States)

    McMillian, Michael H.

    1992-01-01

    An internal combustion engine fueled with a coal-water slurry is described. About 90 percent of the coal-water slurry charge utilized in the power cycle of the engine is directly injected into the main combustion chamber where it is ignited by a hot stream of combustion gases discharged from a pilot combustion chamber of a size less than about 10 percent of the total clearance volume of main combustion chamber with the piston at top dead center. The stream of hot combustion gases is provided by injecting less than about 10 percent of the total coal-water slurry charge into the pilot combustion chamber and using a portion of the air from the main combustion chamber that has been heated by the walls defining the pilot combustion chamber as the ignition source for the coal-water slurry injected into the pilot combustion chamber.

  16. Nucleation and growth of sulfate aerosol in coal-fired power plant plumes: sensitivity to background aerosol and meteorology

    Science.gov (United States)

    Stevens, R. G.; Pierce, J. R.; Brock, C. A.; Reed, M. K.; Crawford, J. H.; Holloway, J. S.; Ryerson, T. B.; Huey, L. G.; Nowak, J. B.

    2012-01-01

    New-particle formation in the plumes of coal-fired power plants and other anthropogenic sulfur sources may be an important source of particles in the atmosphere. It remains unclear, however, how best to reproduce this formation in global and regional aerosol models with grid-box lengths that are 10s of kilometers and larger. The predictive power of these models is thus limited by the resultant uncertainties in aerosol size distributions. In this paper, we focus on sub-grid sulfate aerosol processes within coal-fired power plant plumes: the sub-grid oxidation of SO2 with condensation of H2SO4 onto newly-formed and pre-existing particles. We have developed a modeling framework with aerosol microphysics in the System for Atmospheric Modelling (SAM), a Large-Eddy Simulation/Cloud-Resolving Model (LES/CRM). The model is evaluated against aircraft observations of new-particle formation in two different power-plant plumes and reproduces the major features of the observations. We show how the downwind plume aerosols can be greatly modified by both meteorological and background aerosol conditions. In general, new-particle formation and growth is greatly reduced during polluted conditions due to the large pre-existing aerosol surface area for H2SO4 condensation and particle coagulation. The new-particle formation and growth rates are also a strong function of the amount of sunlight and NOx since both control OH concentrations. The results of this study highlight the importance for improved sub-grid particle formation schemes in regional and global aerosol models.

  17. Boron availability to plants from coal combustion by-products

    International Nuclear Information System (INIS)

    Kukier, U.; Sumner, M.E.

    1996-01-01

    Agronomic use of coal combustion by-products is often associated with boron (B) excess in amended soils and subsequently in plants. A greenhouse study with corn (Zea mays L.) as test plant was conducted to determine safe application rates of five fly ashes and one flue gas desulfurization gypsum (FDG). All by-products increased soil and corn tissue B concentration, in some cases above toxicity levels which are 5 mg hot water soluble B (hwsB)kg -1 soil and 100 mg B kg -1 in corn tissue. Acceptable application rates varied from 4 to 100 Mg ha -1 for different by-products. Leaching and weathering of a high B fly ash under ponding conditions decreased its B content and that of corn grown in fly ash amended soil, while leaching of the same fly ash under laboratory conditions increased fly ash B availability to corn in comparison to the fresh fly ash. Hot water soluble B in fly ash or FDG amended soil correlated very well with corn tissue B. Hot water soluble B in fly ash amended soil could be predicted based on soil pH and B solubility in ash at different pH values but not so in the case of FDG. Another greenhouse study was conducted to compare the influence of FDG and Ca(OH 2 ) on B concentration in spinach (Spinacia oleracea L.) leaves grown in soil amended with the high B fly ash. The Ca(OH) 2 significantly decreased tissue B content, while FDG did not affect B uptake from fly ash amended soil. 41 refs., 6 figs., 5 tabs

  18. Comprehensive assessment of toxic emissions from coal-fired power plants

    International Nuclear Information System (INIS)

    Brown, T.D.; Schmidt, C.E.; Radziwon, A.S.

    1991-01-01

    The Pittsburgh Energy Technology Center (PETC) of the US Department of Energy (DOE) has two current investigations, initiated before passage of the Clean Air Act Amendment (CAAA), that will determine the air toxic emissions from coal-fired electric utilities. DOE has contracted with Battelle Memorial Institute and Radian corporation to conduct studies focusing on the potential air toxics, both organic and inorganic, associated with different size fractions of fine particulate matter emitted from power plant stacks. Table 2 indicates the selected analytes to be investigated during these studies. PETC is also developing guidance on the monitoring of Hazardous Air Pollutants (HAPS) to be incorporated in the Environmental Monitoring plans for the demonstration projects in its Clean Coal Technology Program

  19. Assessment of direct radiological risk and indirect associated toxic risks originated by Coal-Fired Power Plants

    OpenAIRE

    Dinis, M. L.; Fiúza, António; Góis, Joaquim; Carvalho, José Soeiro de; Meira Castro, A C

    2011-01-01

    Over the past few decades there has been some discussion concerning the increase of the natural background radiation originated by coal-fired power plants, due to the uranium and thorium content present in combustion ashes. The radioactive decay products of uranium and thorium, such as radium, radon, polonium, bismuth and lead, are also released in addition to a significant amount of 40K. Since the measurement of radioactive elements released by the gaseous emissions of coal power plants i...

  20. The significance of the pilot conditioning plant (PKA) for spent fuel management

    International Nuclear Information System (INIS)

    Willax, H.O.

    1996-01-01

    The pilot conditioning plant (PKA) is intended as a multi-purpose facility and thus may serve various purposes involved in the conditioning or disposal of spent fuel elements or radwaste. Its design as a pilot plant permits development and trial of various methods and processes for fuel element conditioning, as well as for radwaste conditioning. (orig./DG) [de