  1. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  2. Information needs for demonstrating compliance with groundwater aspects of 40 CFR 192 for uranium mill tailings remedial action programs

    International Nuclear Information System (INIS)

    Logsdon, M.J.; Verma, T.R.; Martin, D.E.

    1984-01-01

    Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978, provides the Department of Energy with authority to perform remedial actions at designated inactive uranium-mill sites. The Environmental Protection Agency promulgated radiological and non-radiological standards (40 CFR 192) for remedial actions at inactive uranium-mill sites. All remedial actions require the concurrence of the Nuclear Regulatory Commission. Subpart C of 40 CFR 192 addresses the control of pollutants in groundwater at sites for which remedial action is proposed pursuant to P.L 95-604. As the authors interpret the regulation, it is essentially an admonition to carefully evaluate what is useful and practicable to deal with existing contamination and to control potential future contamination. In reviewing groundwater aspects of Uranium Mill Tailings Remedial Action documents, current NRC experience shows that the reports should address the following information needs: (1) The need to identify the physical and chemical nature of the present groundwater flow system in sufficient detail to provide a reasonable expectation that the extent and value of the groundwater resource to be protected is understood adequately; (2) The need to identify reasonable foreseeable events, both natural and man-made, that could alter the present groundwater flow system and the effects of such changes on the definition of the protected zone; (3) The need to identify current groundwater use within the protected zone; (4) The need to identify site-specific models, boundary conditions, and representative values of system parameters to predict with reasonable assurance that the proposed actions will protect groundwater and surface water resources for the design period of 200 - 1000 years

  3. Aquifer characterization and groundwater modeling in support of remedial actions at the Weldon Spring Site

    International Nuclear Information System (INIS)

    Durham, L.A.; Carman, J.D.

    1993-01-01

    Aquifer characterization studies were performed to develop a hydrogeologic understanding of an unconfined shallow aquifer at the Weldon Spring site west of St. Louis, Missouri. The 88-ha site became contaminated because of uranium and thorium processing and disposal activities that took place from the 1940s through the 1960s. Slug and pumping tests provided valuable information on the lateral distribution of hydraulic conductivities, and packer tests and lithologic information were used to determine zones of contrasting hydrologic properties within the aquifer. A three-dimensional, finite- element groundwater flow model was developed and used to simulate the shallow groundwater flow system at the site. The results of this study show that groundwater flow through the system is predominantly controlled by a zone of fracturing and weathering in the upper portion of the limestone aquifer. The groundwater flow model, developed and calibrated from field investigations, improved the understanding of the hydrogeology and supported decisions regarding remedial actions at the site. The results of this study illustrate the value, in support of remedial actions, of combining field investigations with numerical modeling to develop an improved understanding of the hydrogeology at the site

  4. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  5. Uranium mill tailings remedial action technology

    International Nuclear Information System (INIS)

    Hartley, J.N.; Gee, G.W.

    1984-01-01

    The uranium milling process involves the hydrometallurgical extraction of uranium from ores and the resultant generation of large quantities of waste referred to as tailings. Uranium mill tailings have been identified as requiring remediation because they contain residual radioactive material that is not removed in the milling process. Potential radiation exposure can result from direct contact with the tailings, from radon gas emitted by the tailings, and from radioactive contamination of groundwater. As a result, the technology developed under the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP) and the US Nuclear Regulatory Commission (NRC) Uranium Recovery Program have focused on radon control, groundwater contamination and the long-term protection of the containment system. This paper briefly summarizes the UMTRAP and NRC remedial action technology development. 33 references, 9 figures, 5 tables

  6. Proposed plan for remedial action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1999-01-01

    This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant area and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation

  7. Use of LCA as decision support for the selection of remedial strategies for remediation of contaminated soil and groundwater

    DEFF Research Database (Denmark)

    Lemming, Gitte; Hauschild, Michael Zwicky; Bjerg, Poul Løgstrup

    2009-01-01

    , there is a trade-off between obtaining local beneficial effects from the remediation and generating environmental impacts on the regional and global scale due to the remedial actions. Therefore there is a need for including the impact of soil contaminants that will potentially leach to the groundwater, e......Groundwater is the dominant source of drinking water in Denmark and the general policy is to maintain the groundwater as a clean source of drinking water. The risk of groundwater contamination is therefore often the prime reason for remediating a contaminated site. Chlorinated solvents are among...... the contaminants most frequently found to be threatening the groundwater quality in Denmark and worldwide. Life cycle assessment has recently been applied as part of decision support for contaminated site management and subsurface remediation techniques. Impacts in the groundwater compartment have only gained...

  8. Case study of an approved corrective action integrating active remediation with intrinsic remediation

    International Nuclear Information System (INIS)

    Teets, D.B.; Guest, P.R.; Blicker, B.R.

    1996-01-01

    Parsons Engineering Science, Inc., performed UST removals and/or site assessments at UST system locations at a former US Air Force Base (AFB) in Denver, Colorado. Four UST systems, incorporating 17 USTs, were located within the petroleum, oils, and lubricants bulk storage yard (POL Yard) of the former AFB. During the tank removals and subsequent site investigations, petroleum hydrocarbon contamination was found in soils at each site. Significant releases from two of the UST systems resulted in a dissolved benzene, toluene, ethylbenzene, and xylenes (BTEX) plume in the groundwater, and smear-zone contamination of soils beneath the majority of the POL Yard. Because of the close proximity of the UST systems, and the presence of the groundwater plume beneath the POL Yard, a corrective action plan (CAP) was prepared that encompassed all four UST systems. An innovative, risk-based CAP integrated active remediation of petroleum-contaminated soils with intrinsic remediation of groundwater. A natural attenuation evaluation for the dissolved BTEX was performed to demonstrate that natural attenuation processes are providing adequate remediation of groundwater and to predict the fate of the groundwater plume. BTEX concentrations versus distance were regressed to obtain attenuation rates, which were then used to calculate BTEX degradation rates using a one-dimensional, steady-state analytical solution. Additionally, electron acceptor concentrations in groundwater were compared to BTEX concentrations to provide evidence that natural attenuation of BTEX compounds was occurring. The natural attenuation evaluation was used in the CAP to support the intrinsic remediation with long-term monitoring alternative for groundwater, thereby avoiding the installation of an expensive groundwater remediation system

  9. Mitigation action plan for 300-FF-1 remedial action

    International Nuclear Information System (INIS)

    Weiss, S.G.

    1996-10-01

    A record of decision was issued (dated July 1996), for remediation of waste sites in the 300-FF-1 Operable Unit in the 300 Area of the Hanford Site. The selected remedies for the 300-FF-1 and 300-FF-5 waste sites include selective excavation and disposal of contaminated soil and debris from the process waste units, excavation and removal of the 618-4 Burial Ground, and institutional controls for groundwater. This mitigation action plan explains how cultural resources will be managed and how revegetation for these remedial activities will be planned

  10. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the

  11. Soil and groundwater remediation using dual-phase extraction technology

    International Nuclear Information System (INIS)

    Miller, A.W.; Gan, D.R.

    1995-01-01

    A gasoline underground storage tank (UST) was formerly used to fuel vehicles for a hospital in Madison, Wisconsin. Elevated concentrations of gasoline range organics (GRO) were observed in soils and groundwater at the site during the tank removal and a subsequent site investigation. Based on the extent of soil and groundwater contamination, a dual-phase extraction technology was selected as the most cost effective alternative to remediate the site. The dual-phase extraction system includes one extraction well functioning both as a soil vapor extraction (SVE) and groundwater recovery well. After six months of operation, samples collected from the groundwater monitoring wells indicated that the groundwater has been cleaned up to levels below the Wisconsin preventative action limits. The dual-phase extraction system effectively remediated the site in a short period of time, saving both operation and maintenance costs and overall project cost

  12. Stochastic goal programming based groundwater remediation management under human-health-risk uncertainty

    International Nuclear Information System (INIS)

    Li, Jing; He, Li; Lu, Hongwei; Fan, Xing

    2014-01-01

    Highlights: • We propose an integrated optimal groundwater remediation design approach. • The approach can address stochasticity in carcinogenic risks. • Goal programming is used to make the system approaching to ideal operation and remediation effects. • The uncertainty in slope factor is evaluated under different confidence levels. • Optimal strategies are obtained to support remediation design under uncertainty. - Abstract: An optimal design approach for groundwater remediation is developed through incorporating numerical simulation, health risk assessment, uncertainty analysis and nonlinear optimization within a general framework. Stochastic analysis and goal programming are introduced into the framework to handle uncertainties in real-world groundwater remediation systems. Carcinogenic risks associated with remediation actions are further evaluated at four confidence levels. The differences between ideal and predicted constraints are minimized by goal programming. The approach is then applied to a contaminated site in western Canada for creating a set of optimal remediation strategies. Results from the case study indicate that factors including environmental standards, health risks and technical requirements mutually affected and restricted themselves. Stochastic uncertainty existed in the entire process of remediation optimization, which should to be taken into consideration in groundwater remediation design

  13. In situ remediation of uranium contaminated groundwater

    International Nuclear Information System (INIS)

    Dwyer, B.P.; Marozas, D.C.

    1997-01-01

    In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ to acceptable regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field results are discussed with regard to other potential contaminated groundwater treatment applications

  14. Risk assessment guidance document for the UMTRA project groundwater remediation phase

    International Nuclear Information System (INIS)

    1992-05-01

    The purpose of the groundwater remedial activities at the Uranium Mill Tailings Remedial Action (UMTRA) sites is to reduce, control, or eliminate risks to human health and the environment. This is in accordance with Subpart B of 40 CFR 192. According to this regulation, the need for groundwater restoration is based upon US Environmental Protection Agency (EPA)-defined groundwater cleanup standards and must be consistent with the National Environmental Policy Act (NEPA) process. Risk assessments will be used in the UMTRA Groundwater Program to aid in the evaluation of sites. Risk assessments are conducted for four purposes: (1) Preliminary risk assessments are used to aid in prioritizing sites, scope data collection, end determine if a site presents immediate health risks. (2) Baseline risk assessments provide a comprehensive integration and interpretation of demographic, geographic, physical, chemical, and biological factors at a site to determine the extent of actual or potential harm. This information Is used to determine the need for remedial action. (3) Risk evaluation of remedial alternatives is performed to evaluate risks to humans or the environment associated with the various remedial strategies. (4) After remediation, an evaluation of residual risks is conducted. The information gathered for each of these risk evaluations is used to determine the need for subsequent evaluation. Several sites may be eliminated after a preliminary risk assessment if there is no current or future threat to humans or the environment. Likewise, much of the data from a baseline risk assessment can be used to support alternate concentration limits or supplemental standards demonstrations, or identify sensitive habitats or receptors that may be of concern in selecting a remedy

  15. The UMTRA PEIS: A strategy for groundwater remediation

    International Nuclear Information System (INIS)

    Burt, C.; Ulland, L.; Weston, R.F.; Metzler, D.

    1993-01-01

    A programmatic environmental impact statement (PEIS) was initiated in 1992 for the uranium mill tailings remedial action (UMTRA) program. The PEIS kicked off the groundwater restoration phase of UMTRA, a project involving remediation of 24 sites in ten states and tribal lands contaminated with tailings from uranium mining and milling operations. The U.S. Department of Energy (DOE) agreed, in early 1992, that a PEIS was an appropriate strategy to comply with the National Environmental Policy Act (NEPA) for this second, groundwater phase of the project. This decision recognized that although a parallel effort was being undertaken in preparing a PEIS for DOE's Environmental Restoration/Waste Management (ER/WM) program, characteristics and the maturity of the UMTRA project made it more appropriate to prepare a separate PEIS. The ER/WM PEIS is intended to examine environmental restoration and waste management issues from a very broad perspective. For UMTRA, with surface remediation completed or well under way at 18 of the 24 sites, a more focused programmatic approach for groundwater restoration is more effective than including the UMTRA project within the ER/WM environmental impact statements. A separate document allows a more focused and detailed analysis necessary to efficiently tier site-specific environmental assessments for groundwater restoration at each of the 24 UMTRA former processing sites

  16. Hanford Sitewide Groundwater Remediation Strategy

    International Nuclear Information System (INIS)

    Knepp, A.J.; Isaacs, J.D.

    1997-09-01

    This document fulfills the requirements of the Hanford Federal Facility Agreement and Consent Order, Milestone M-13-81, to develop a concise statement of strategy that describe show the Hanford Site groundwater remediation will be accomplished. The strategy addresses objectives and goals, prioritization of activities, and technical approaches for groundwater cleanup. The strategy establishes that the overall goal of groundwater remediation on the Hanford Site is to restore groundwater to its beneficial uses in terms of protecting human health and the environment, and its use as a natural resource. The Hanford Future Site Uses Working Group established two categories for groundwater commensurate with various proposed landuses: (1) restricted use or access to groundwater in the Central Plateau and in a buffer zone surrounding it and (2) unrestricted use or access to groundwater for all other areas. In recognition of the Hanford Future Site Uses Working Group and public values, the strategy establishes that the sitewide approach to groundwater cleanup is to remediate the major plumes found in the reactor areas that enter the Columbia River and to contain the spread and reduce the mass of the major plumes found in the Central Plateau

  17. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area at the Weldon Spring Site, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1999-01-01

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the

  18. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1992-12-01

    This fourteenth annual status report for the Uranium Mill Tailings Remedial Action (UMTRA) Project Office summarizes activities of the Uranium Mill Tailings Remedial Action Surface (UMTRA-Surface) and Uranium Mill Tailings Remedial Action Groundwater (UMTRA-Groundwater) Projects undertaken during fiscal year (FY) 1992 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1993 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604. The DOE will continue to submit annual reports to DOE-Headquarters, the states, tribes, and local representatives through Project completion in order to inform the public of the yearly Project status. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive material (RRM) located on the inactive uranium processing sites in a safe and environmentally sound manner, and to minimize or eliminate potential health hazards. Commercial and residential properties near designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties (VP),'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated VPs located in 10 states, and the VPs associated with the Edgemont, South Dakota, uranium mill currently owned by the Tennessee Valley Authority (TVA) (Figure A.1, Appendix A)

  19. Groundwater Remediation in a Floodplain Aquifer at Shiprock, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, Dave [Navarro Research and Engineering; Miller, David [Navarro Research and Engineering; Kautsky, Mark [U. S. Department of Energy, Office of Legacy Management; Dander, David [Navarro Research and Engineering; Nofchissey, Joni [Navajo Nation Division of Natural Resources

    2016-03-06

    A uranium- and vanadium-ore-processing mill operated from 1954 to 1968 within the Navajo Nation near Shiprock, New Mexico. By September 1986, all tailings and structures on the former mill property were encapsulated in a disposal cell built on top of two existing tailings piles on the Shiprock site (the site) [1]. Local groundwater was contaminated by multiple inorganic constituents as a result of the milling operations. The U.S. Department of Energy (DOE) took over management of the site in 1978 as part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The DOE Office of Legacy Management currently manages ongoing activities at the former mill facility, including groundwater remediation. Remediation activities are designed primarily to reduce the concentrations and total plume mass of the mill-related contaminants sulfate, uranium, and nitrate. In addition to contaminating groundwater in alluvial and bedrock sediments directly below the mill site, ore processing led to contamination of a nearby floodplain bordering the San Juan River. Groundwater in a shallow alluvial aquifer beneath the floodplain is strongly influenced by the morphology of the river channel as well as changing flows in the river, which provides drainage for regional runoff from the San Juan Mountains of Colorado. As part of a recent study of the floodplain hydrology, a revised conceptual model was developed for the alluvial aquifer along with an updated status of contaminant plumes that have been impacted by more than 10 years of groundwater pumping for site remediation purposes. Several findings from the recent study will be discussed here.

  20. The effect of remedial measures upon groundwater quality in connection with soil contamination by chlorinated hydrocarbons and the related costs - by example of the City of Hanover

    International Nuclear Information System (INIS)

    Mull, R.; Mull, J.; Pielke, M.

    1992-01-01

    The effectiveness of remedial actions on the groundwater quality was investigated in the aquifer of the City of Hannover. The improvement of groundwater quality was related to the costs for the remedial actions. The attention was focussed on groundwater pollution by chlorinated hydrocarbons as the most important contaminants of groundwater in urban areas. (orig.)

  1. Technical approach to groundwater restoration

    International Nuclear Information System (INIS)

    1993-01-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures

  2. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  3. Engineering evaluation/conceptual plan for the 200-UP-1 groundwater operable unit interim remedial measure

    International Nuclear Information System (INIS)

    Myers, D.A.; Swanson, L.C.; Weeks, R.S.; Giacinto, J.; Gustafson, F.W.; Ford, B.H.; Wittreich, C.; Parnell, S.; Green, J.

    1995-04-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (ERM) to address a uranium and technetium-99 groundwater plume and an associated nitrate contamination plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need and potentially achievable objectives and goals for an IRM and evaluates alternatives to contain elevated concentrations of uranium, technetium-99, nitrate, and carbon tetrachloride and to obtain information necessary to develop final remedial actions for the operable unit

  4. 300-FF-1 remedial design report/remedial action work plan

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  5. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  6. Effectiveness of interim remedial actions at a radioactive waste facility

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  7. Engineering evaluation/conceptual plan for the 200-UP-1 Groundwater Operable Unit interim remedial measure. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (IRM) to address a uranium and technetium-99 groundwater plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need for an IRM and its potentially achievable objectives and goals. The report also evaluates alternatives to contain elevated concentrations of uranium and technetium-99 and to obtain information necessary to develop final remedial actions for the operable unit

  8. Technical options for the remediation of contaminated groundwater

    Energy Technology Data Exchange (ETDEWEB)

    1999-06-01

    This report provides a description of the nature and extent of problems related to radioactive groundwater contamination by outlining the environmental impacts, the sources of contamination and the contaminants of concern radionuclides and their associated contaminants - the main exposure pathways and transport processes and the assessment of risks associated with contaminated groundwater. The main emphasis of this report is on methodologies used in groundwater remediation and available technologies. The methodology section outlines the importance of an initial scoping analysis including the evaluation of uncertainties of the available data and the necessity for defining clear objectives for data collection. This is then followed by comprehensive site characterization, setting of goals and developing alternatives which will be analysed in detail. Available technologies are grouped generally into in situ methods aiming at a containment of the contaminants in place and engineered treatment methods involving an alteration of groundwater flow, quantity and/or quality to achieve compliance with set goals. Groundwater remediation by natural flushing allows the natural groundwater movement and geochemical processes to decrease the contaminant concentrations to acceptable levels over a specified period of time. This method is increasingly accepted in areas where the use of groundwater can be temporarily restricted or engineered cleanup methods do not offer particular advantage over the natural processes. The application of technological methods for remediating contaminated groundwaters has to be considered in conjunction with management options such as diversion and development of alternative water sources. The experience with groundwater contamination accrued in IAEA Member States is concentrated in those countries with active uranium mining and milling facilities and nuclear energy programmes. This experience is reported in the Annexes, which include case studies. It

  9. Technical options for the remediation of contaminated groundwater

    International Nuclear Information System (INIS)

    1999-06-01

    This report provides a description of the nature and extent of problems related to radioactive groundwater contamination by outlining the environmental impacts, the sources of contamination and the contaminants of concern radionuclides and their associated contaminants - the main exposure pathways and transport processes and the assessment of risks associated with contaminated groundwater. The main emphasis of this report is on methodologies used in groundwater remediation and available technologies. The methodology section outlines the importance of an initial scoping analysis including the evaluation of uncertainties of the available data and the necessity for defining clear objectives for data collection. This is then followed by comprehensive site characterization, setting of goals and developing alternatives which will be analysed in detail. Available technologies are grouped generally into in situ methods aiming at a containment of the contaminants in place and engineered treatment methods involving an alteration of groundwater flow, quantity and/or quality to achieve compliance with set goals. Groundwater remediation by natural flushing allows the natural groundwater movement and geochemical processes to decrease the contaminant concentrations to acceptable levels over a specified period of time. This method is increasingly accepted in areas where the use of groundwater can be temporarily restricted or engineered cleanup methods do not offer particular advantage over the natural processes. The application of technological methods for remediating contaminated groundwaters has to be considered in conjunction with management options such as diversion and development of alternative water sources. The experience with groundwater contamination accrued in IAEA Member States is concentrated in those countries with active uranium mining and milling facilities and nuclear energy programmes. This experience is reported in the Annexes, which include case studies. It

  10. Application of ozone micro-nano-bubbles to groundwater remediation.

    Science.gov (United States)

    Hu, Liming; Xia, Zhiran

    2018-01-15

    Ozone is widely used for water treatment because of its strong oxidation ability. However, the efficiency of ozone in groundwater remediation is limited because of its relatively low solubility and rapid decomposition in the aqueous phase. Methods for increasing the stability of ozone within the subsurface are drawing increasing attention. Micro-nano-bubbles (MNBs), with diameters ranging from tens of nanometres to tens of micrometres, present rapid mass transfer rates, persist for a relatively long time in water, and transport with groundwater flow, which significantly improve gas concentration and provide a continuous gas supply. Therefore, MNBs show a considerable potential for application in groundwater remediation. In this study, the characteristics of ozone MNBs were examined, including their size distribution, bubble quantity, and zeta potential. The mass transfer rate of ozone MNBs was experimentally investigated. Ozone MNBs were then used to treat organics-contaminated water, and they showed remarkable cleanup efficiency. Column tests were also conducted to study the efficiency of ozone MNBs for organics-contaminated groundwater remediation. Based on the laboratory tests, field monitoring was conducted on a trichloroethylene (TCE)-contaminated site. The results showed that ozone MNBs can greatly improve remediation efficiency and represent an innovative technology for in situ remediation of organics-contaminated groundwater. Copyright © 2017 The Author(s). Published by Elsevier B.V. All rights reserved.

  11. Groundwater remediation from the past to the future: A bibliometric analysis.

    Science.gov (United States)

    Zhang, Shu; Mao, Guozhu; Crittenden, John; Liu, Xi; Du, Huibin

    2017-08-01

    Groundwater is an important component of terrestrial ecosystems and plays a role in geochemical cycling. Groundwater is also used for agricultural irrigation and for the domestic supply of drinking water in most nations. However, groundwater contamination has led to many research efforts on groundwater remediation technologies and strategies. This study evaluated a total of 5486 groundwater remediation-related publications from 1995 to 2015 using bibliometric technology and social network analysis, to provide a quantitative analysis and a global view on the current research trend and future research directions. Our results underline a strong research interest and an urgent need to remediate groundwater pollution due to the increasing number of both groundwater contamination and remediation publications. In the past two decades, the United States (U.S.) published 41.1% of the papers and it was the core country of the international collaboration network, cooperating with the other 19 most productive countries. Besides the active international collaboration, the funding agencies also played positive roles to foster the science and technology publications. With respect to the analysis of the distribution of funding agencies, the National Science Foundation of China sponsored most of the groundwater remediation research. We also identified the most productive journals, Environmental Science and Technology and Journal of Contaminant Hydrology, which published 334 and 259 scientific articles (including research articles and reviews) over the past 20 years, respectively. In addition to journal publications, a patent analysis was performed to show the impact of intellectual property protection on journal publications. Three major remediation technologies, including chemical oxidation, biodegradation and adsorption, have received increasing interest in both journal publication and patent development. Our results provide a valuable reference and global overview to identify

  12. Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan: Volume 2 of 4

    International Nuclear Information System (INIS)

    1996-08-01

    This appendix discusses the scope of actions addressed in the Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan. To address the purpose and need for agency action identified in Chapter 2.0 of the HRA-EIS, the scope includes an evaluation of the potential environmental impacts associated with the remedial actions to be conducted by the US Department of Energy (DOE) under the provisions of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1989). These remedial actions would bring the Hanford Site into compliance with the applicable requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA). The DOE program responsible for conducting remedial actions at the Hanford Site is referred to as the Richland Environmental Restoration (ER) Project. The Richland ER Project encompasses the following projects: radiation area remedial actions and underground storage tanks (UST); RCRA closures; single-shell tank (SST) closures; past-practice waste site operable unit (source and groundwater) remedial actions; surplus facility decommissioning; and waste storage and disposal facilities

  13. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-10-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer at the point of compliance (POC) at the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site near Gunnison, Colorado. The proposed remedial action will ensure protection of human health and the environment. A summary of the principal features of the water resources protection strategy for the Gunnison disposal site is included in this report

  14. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium- 99 T c -Nitrate multi-contaminant IRM plume identified beneath U Plant

  15. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Appendix B of Attachment 3: Groundwater hydrology report, Attachment 4: Water resources protection strategy, Final

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    Attachment 3 Groundwater Hydrology Report describes the hydrogeology, water quality, and water resources at the processing site and Dry Flats disposal site. The Hydrological Services calculations contained in Appendix A of Attachment 3, are presented in a separate report. Attachment 4 Water Resources Protection Strategy describes how the remedial action will be in compliance with the proposed EPA groundwater standards.

  16. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  17. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    International Nuclear Information System (INIS)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word

  18. Application of optimization modeling to groundwater remediation at US Department of Energy facilities

    International Nuclear Information System (INIS)

    Bakr, A.A.; Dal Santo, D.J.; Smalley, R.C.; Phillips, E.C.

    1988-01-01

    This paper outlines and explores the fundamentals of the current strategies for groundwater hydraulic and quality management modeling and presents a scheme for the application of such strategies to DOE facilities. The discussion focuses on the DOE-Savannah River Operations (DOE-SR) facility. Remediation of contaminated groundwater at active and abandoned waste disposal sites has become a major element of environmental programs. Traditional groundwater remediation programs (e.g., pumping and treatment) may not represent optimal water quality management strategies at sites to be remediated. Complex, interrelated environmental (geologic/geohydrologic), institutional, engineering, and economic conditions at a site may require a more comprehensive management strategy. Groundwater management models based on the principles of operations research have been developed and used to determine optimal management strategies for water resources needs and for hypothetical remediation programs. Strategies for groundwater remediation programs have ranged from the simple removal of groundwater to complex, hydraulic gradient control programs involving groundwater removal, treatment, and recharge

  19. Remedial action and waste disposal project: 100-B/C remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-06-01

    The Readiness Evaluation Plan presents the methodology used to assess the readiness of the 100-B/C Remedial Action Project. The 100 Areas Remedial Action Project will remediate the 100 Areas liquid waste site identified in the Interim Action Record of Decision for the 100- BC-1, 100-DR-1, and 100-HR-1 Operable Units. These sites are located in the 100 Area of the Hanford Site in Richland, Washington

  20. RCRA corrective action ampersand CERCLA remedial action reference guide

    International Nuclear Information System (INIS)

    1994-07-01

    This reference guide provides a side-by-side comparison of RCRA corrective action and CERCLA Remedial Action, focusing on the statutory and regulatory requirements under each program, criterial and other factors that govern a site's progress, and the ways in which authorities or requirements under each program overlap and/or differ. Topics include the following: Intent of regulation; administration; types of sites and/or facilities; definition of site and/or facility; constituents of concern; exclusions; provisions for short-term remedies; triggers for initial site investigation; short term response actions; site investigations; remedial investigations; remedial alternatives; clean up criterial; final remedy; implementing remedy; on-site waste management; completion of remedial process

  1. Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

    International Nuclear Information System (INIS)

    Deeb, Rula A.; Hawley, Elisabeth L.

    2013-01-01

    alternative endpoints for groundwater remediation at complex sites. A statistical analysis of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) sites receiving TI waivers will be presented as well as case studies of other types of alternative endpoints and alternative remedial strategies that illustrate the variety of approaches used at complex sites and the technical analyses used to predict and document cost, time frame, and potential remedial effectiveness. This presentation is intended to inform DOE program managers, state regulators, practitioners and other stakeholders who are evaluating technical cleanup challenges within their own programs, and establishing programmatic approaches to evaluating and implementing long-term management approaches. Case studies provide examples of long-term management designations and strategies to manage and remediate groundwater at complex sites. At least 13 states consider some designation for groundwater containment in their corrective action policies, such as groundwater management zones, containment zones, and groundwater classification exemption areas. Long-term management designations are not a way to 'do nothing' or walk away from a site. Instead, soil and groundwater within the zone is managed to be protective of human health and the environment. Understanding when and how to adopt a long-term management approach can lead to cost savings and the more efficient use of resources across DOE and at numerous other industrial and military sites across the U.S. This presentation provides context for assessing the use and appropriate role of alternative endpoints and supporting long-term management designations in final remedies. (authors)

  2. Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

    Energy Technology Data Exchange (ETDEWEB)

    Deeb, Rula A.; Hawley, Elisabeth L. [ARCADIS, U.S., 2000 Powell St., 7th Floor, Emeryville, California 94608 (United States)

    2013-07-01

    to evaluate alternative endpoints for groundwater remediation at complex sites. A statistical analysis of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) sites receiving TI waivers will be presented as well as case studies of other types of alternative endpoints and alternative remedial strategies that illustrate the variety of approaches used at complex sites and the technical analyses used to predict and document cost, time frame, and potential remedial effectiveness. This presentation is intended to inform DOE program managers, state regulators, practitioners and other stakeholders who are evaluating technical cleanup challenges within their own programs, and establishing programmatic approaches to evaluating and implementing long-term management approaches. Case studies provide examples of long-term management designations and strategies to manage and remediate groundwater at complex sites. At least 13 states consider some designation for groundwater containment in their corrective action policies, such as groundwater management zones, containment zones, and groundwater classification exemption areas. Long-term management designations are not a way to 'do nothing' or walk away from a site. Instead, soil and groundwater within the zone is managed to be protective of human health and the environment. Understanding when and how to adopt a long-term management approach can lead to cost savings and the more efficient use of resources across DOE and at numerous other industrial and military sites across the U.S. This presentation provides context for assessing the use and appropriate role of alternative endpoints and supporting long-term management designations in final remedies. (authors)

  3. Black Swans and the Effectiveness of Remediating Groundwater Contamination

    Science.gov (United States)

    Siegel, D. I.; Otz, M. H.; Otz, I.

    2013-12-01

    Black swans, outliers, dominate science far more than do predictable outcomes. Predictable success constitutes the Black Swan in groundwater remediation. Even the National Research Council concluded that remediating groundwater to drinking water standards has failed in typically complex hydrogeologic settings where heterogeneities and preferential flow paths deflect flow paths obliquely to hydraulic gradients. Natural systems, be they biological or physical, build upon a combination of large-scale regularity coupled to chaos at smaller scales. We show through a review of over 25 case studies that groundwater remediation efforts are best served by coupling parsimonious site characterization to natural and induced geochemical tracer tests to at least know where contamination advects with groundwater in the subsurface. In the majority of our case studies, actual flow paths diverge tens of degrees from anticipated flow paths because of unrecognized heterogeneities in the horizontal direction of transport, let alone the vertical direction. Consequently, regulatory agencies would better serve both the public and the environment by recognizing that long-term groundwater cleanup probably is futile in most hydrogeologic settings except to relaxed standards similar to brownfielding. A Black Swan

  4. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  5. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  6. DOE'S remedial action assurance program

    International Nuclear Information System (INIS)

    Welty, C.G. Jr.; Needels, T.S.; Denham, D.H.

    1984-10-01

    The formulation and initial implementation of DOE's Assurance Program for Remedial Action are described. It was initiated in FY 84 and is expected to be further implemented in FY 85 as the activities of DOE's Remedial Action programs continue to expand. Further APRA implementation will include additional document reviews, site inspections, and program office appraisals with emphasis on Uranium Mill Tailings Remedial Action Program and Surplus Facilities Management Program

  7. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    International Nuclear Information System (INIS)

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D ampersand D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D ampersand D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword

  8. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.

  9. Groundwater remediation in the Straz leaching operation

    International Nuclear Information System (INIS)

    Novak, J.

    2001-01-01

    The locality affected by consequences of the chemical mining of the uranium during underground leaching 'in situ' is found in the area of the Czech Republic in the northeastern part of the Ceska Lipa district. In the contribution the complex groundwater remediation project is discussed. First, the risks of the current state are expressed. Then the alternatives of remediation of the both Cenomanian and Turonian aquifers are presented. Evaluation of the remediation alternatives with the view to the time-consumption, economy, ecology and the elimination of unacceptable risks for the population and environment is done. Finally, the present progress of remediation and the conception of remediation of chemical mining on deposit of Straz pod Ralskem are presented. (orig.)

  10. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies

  11. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  12. Uranium Mill Tailings Remedial Action 1993 Roadmap

    International Nuclear Information System (INIS)

    1993-01-01

    The 1993 Roadmap for the Uranium Mill Tailings Remedial Action (UMTRA) Project office is a tool to assess and resolve issues. The US Department of Energy (DOE) UMTRA Project Office uses the nine-step roadmapping process as a basis for Surface and Groundwater Project planning. This is the second year the Roadmap document has been used to identify key issues and assumptions, develop logic diagrams, and outline milestones. This document is a key element of the DOE planning process. A multi-interest group used the nine-step process to focus on issues, root cause analysis and resolutions. This core group updated and incorporated comments on the basic assumptions, then used these assumptions to identify issues. The list of assumptions was categorized into the following areas: institutional, regulatory compliance, project management, human resource requirements, and other site-specific assumptions. The group identified 10 issues in the analysis phase. All of the issues are ranked according to importance. The number one issue from the 1992 Roadmap, ''Lack of sufficient human resources,'' remained the number one issue in 1993. The issues and their ranking are as follows: Lack of sufficient human resources; increasing regulatory requirements; unresolved groundwater issues; extension of UMTRCA through September 30, 1998; lack of post-UMTRA and post-cell closure policies; unpredictable amounts and timing of Federal funding; lack of regulatory compliance agreements; problem with states providing their share of remedial action costs; different interests and priorities among participants; and technology development/transfer. The issues are outlined and analyzed in detail in Section 8.0, with a schedule for resolution of these issues in Section 9.0

  13. Independent Technical Review of the X-740 Groundwater Remedy, Portsmouth, Ohio: Technical Evaluation and Recommendations

    International Nuclear Information System (INIS)

    Looney, B.; Rhia, B.; Jackson, D.; Eddy-Dilek, C.

    2010-01-01

    Two major remedial campaigns have been applied to a plume of trichloroethene (TCE) contaminated groundwater near the former X-740 facility at the Portsmouth Gaseous Diffusion Plant in Piketon Ohio. The two selected technologies, phytoremediation using a stand of hybrid poplar trees from 1999-2007 and in situ chemical oxidation using modified Fenton's Reagent from 2008-2009, have proven ineffective in achieving remedial action objectives (RAOs). The 'poor' performance of these technologies is a direct result of site specific conditions and the local contaminant hydrogeology. Key among these challenges is the highly heterogeneous subsurface geology with a thin contaminated aquifer zone (the Gallia) - the behavior of the contamination in the Gallia is currently dominated by slow release of TCE from the clay of the overlying Minford formation, from the sandstone of the underlying Berea formation, and from clayey layers within the Gallia itself. In response to the remediation challenges for the X-740 plume, the Portsmouth team (including the US Department of Energy (DOE), the site contractor (CDM), and the Ohio Environmental Protection Agency (OEPA)) is evaluating the feasibility of remediation at this site and identifying specific alternatives that are well matched to site conditions and that would maximize the potential for achieving RAOs. To support this evaluation, the DOE Office of Groundwater and Soil Remediation (EM-32) assembled a team of experts to serve as a resource and provide input and recommendations to Portsmouth. Despite the challenging site conditions and the failure of the previous two remediation campaigns to adequately move the site toward RAOs, the review team was unanimous in the conclusion that an effective combination of cost effective technologies can be identified. Further, the team expressed optimism that RAOs can be achieved if realistic timeframes are accepted by all parties. The initial efforts of the review team focused on reviewing the

  14. Hydrocarbon impacts and remedial action at an active service station

    Energy Technology Data Exchange (ETDEWEB)

    Haidar, S.A. [Keystone Environmental, Burnaby, BC (Canada); Linke, J. [Chevron Canada Ltd., Vancouver, BC (Canada)

    2006-07-01

    This presentation discussed a project that examined the hydrocarbon impacts and remedial action at an active service station. The presentation identified the project partners, discussed the background on the project and project goals. Chevron Canada was the site involved in the study and Keystone Environmental was responsible for testing soil samples, developing the detailed conceptual site model, and for conducting indoor air quality monitoring. The presentation also provided illustrations of the site layout, investigated areas, and soil and groundwater plume. The evaluation and selection of remedial options were also discussed as well as other project planning activities such as assembling the project team, obtaining agreement with stakeholders, and coordinating with the municipality, utility companies, residents, and neighbours. Remediation efforts that were described and illustrated in the presentation included: underpinning and shoring; excavation; and, barrier wall installation. Last, post remediation activities were identified including the installation of post remediation confirmatory wells; reinstating structures; reinstating rear yards, fences, and garages; reconnecting utilities; performance monitoring of barrier wall; and, preparing closure reports for certificates of compliance on off-site properties. 6 figs.

  15. ALTERNATIVE REMEDIATION TECHNOLOGY STUDY FOR GROUNDWATER TREATMENT AT 200-PO-1 OPERABLE UNIT AT HANFORD SITE

    Energy Technology Data Exchange (ETDEWEB)

    DADO MA

    2008-07-31

    This study focuses on the remediation methods and technologies applicable for use at 200-PO-I Groundwater Operable Unit (OU) at the Hanford Site. The 200-PO-I Groundwater au requires groundwater remediation because of the existence of contaminants of potential concern (COPC). A screening was conducted on alternative technologies and methods of remediation to determine which show the most potential for remediation of groundwater contaminants. The possible technologies were screened to determine which would be suggested for further study and which were not applicable for groundwater remediation. COPCs determined by the Hanford Site groundwater monitoring were grouped into categories based on properties linking them by remediation methods applicable to each COPC group. The screening considered the following criteria. (1) Determine if the suggested method or technology can be used for the specific contaminants found in groundwater and if the technology can be applied at the 200-PO-I Groundwater au, based on physical characteristics such as geology and depth to groundwater. (2) Evaluate screened technologies based on testing and development stages, effectiveness, implementability, cost, and time. This report documents the results of an intern research project conducted by Mathew Dado for Central Plateau Remediation in the Soil and Groundwater Remediation Project. The study was conducted under the technical supervision of Gloria Cummins and management supervision of Theresa Bergman and Becky Austin.

  16. Environmental assessment of remedial action at the Lowman Uranium Mill Tailings Site near Lowman, Idaho

    International Nuclear Information System (INIS)

    1991-01-01

    This document assesses the environmental impacts of stabilization on site of the contaminated materials at the Lowman uranium mill tailings site. The Lowman site is 0.5 road mile northeast of the unincorporated village of Lowman, Idaho, and 73 road miles from Boise, Idaho. The Lowman site consists of piles of radioactive sands, an ore storage area, abandoned mill buildings, and windblown/waterborne contaminated areas. A total of 29.5 acres of land are contaminated and most of this land occurs within the 35-acre designated site boundary. The proposed action is to stabilize the tailings and other contaminated materials on the site. A radon barrier would be constructed over the consolidated residual radioactive materials and various erosion control measures would be implemented to ensure the long-term stability of the disposal cell. Radioactive constituents and other hazardous constituents were not detected in the groundwater beneath the Lowman site. The groundwater beneath the disposal cell would not become contaminated during or after remedial action so the maximum concentration limits or background concentrations for the contaminants listed in the draft EPA groundwater protection standards would be met at the point of compliance. No significant impacts were identified as a result of the proposed remedial action at the Lowman site

  17. Case studies illustrating in-situ remediation methods for soil and groundwater contaminated with petrochemicals

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, Robert A; Lance, P E; Downs, A; Kier, Brian P [EMCON Northwest Inc., Portland, OR (United States)

    1994-12-31

    Four case studies of successful in-situ remediation are summarized illustrating cost-effective methods to remediate soil and groundwater contaminated with volatile and non-volatile petrochemicals. Each site is in a different geologic environment with varying soil types and with and without groundwater impact. The methods described include vadose zone vapor extraction, high-vacuum vapor extraction combined with groundwater tab.le depression, air sparging with groundwater recovery and vapor extraction, and bio remediation of saturated zone soils using inorganic nutrient and oxygen addition

  18. Case studies illustrating in-situ remediation methods for soil and groundwater contaminated with petrochemicals

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, Robert A.; Lance, P.E.; Downs, A.; Kier, Brian P. [EMCON Northwest Inc., Portland, OR (United States)

    1993-12-31

    Four case studies of successful in-situ remediation are summarized illustrating cost-effective methods to remediate soil and groundwater contaminated with volatile and non-volatile petrochemicals. Each site is in a different geologic environment with varying soil types and with and without groundwater impact. The methods described include vadose zone vapor extraction, high-vacuum vapor extraction combined with groundwater tab.le depression, air sparging with groundwater recovery and vapor extraction, and bio remediation of saturated zone soils using inorganic nutrient and oxygen addition

  19. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action

  20. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-03-01

    Attachment 3 Groundwater Hydrology Report describes the hydrogeology, water quality, and water resources at the processing site and Dry Flats disposal site. The Hydrological Services calculations contained in Appendix A of Attachment 3, are presented in a separate report. Attachment 4 Water Resources Protection Strategy describes how the remedial action will be in compliance with the proposed EPA groundwater standards

  1. A Sustainability Assessment Methodology for Prioritizing the Technologies of Groundwater Contamination Remediation

    DEFF Research Database (Denmark)

    An, Da; Xi, Beidou; Wang, Yue

    2016-01-01

    More and more groundwater has 23 been polluted recently, and technologies for groundwater contamination remediation are of vital importance; however, it is usually difficult for the users to select the most suitable technology among multiple alternatives. In order to address this, this study aims...... at developing a sustainability assessment framework for prioritizing the technologies for groundwater contamination remediation by combining the concept of sustainability and multi-criteria decision making (MCDM) method. A criterion system which consists of six criteria in three aspects has been proposed...... for sustainability assessment of technologies for groundwater contamination remediation, and a novel MCDM method by combining the logarithmic fuzzy preference programming based fuzzy analytic hierarchy process and the improved ELECTRE method has been developed for prioritizing the alternatives. In order...

  2. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  3. ICDF Complex Remedial Action Report

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2007-09-26

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  4. Y-12 Plant Remedial Action technology logic diagram. Volume I: Technology evaluation

    International Nuclear Information System (INIS)

    1994-09-01

    The Y-12 Plant Remedial Action Program addresses remediation of the contaminated groundwater, surface water and soil in the following areas located on the Oak Ridge Reservation: Chestnut Ridge, Bear Creek Valley, the Upper and Lower East Fork Popular Creek Watersheds, CAPCA 1, which includes several areas in which remediation has been completed, and CAPCA 2, which includes dense nonaqueous phase liquid wells and a storage facility. There are many facilities within these areas that are contaminated by uranium, mercury, organics, and other materials. This Technology Logic Diagram identifies possible remediation technologies that can be applied to the soil, water, and contaminants for characterization, treatment, and waste management technology options are supplemented by identification of possible robotics or automation technologies. These would facilitate the cleanup effort by improving safety, of remediation, improving the final remediation product, or decreasing the remediation cost. The Technology Logic Diagram was prepared by a diverse group of more than 35 scientists and engineers from across the Oak Ridge Reservation. Most are specialists in the areas of their contributions. 22 refs., 25 tabs

  5. DOE's Assurance Program for Remedial Action (APRA)

    International Nuclear Information System (INIS)

    Denham, D.H.; Stenner, R.D.; Welty, C.G. Jr.; Needels, T.S.

    1985-01-01

    The US Department of Energy's (DOE) Office of Operational Safety (OOS) is presently developing and implementing the Assurance Program for Remedial Action (APRA) to overview DOE's Remedial Action programs. APRA's objective is to ensure the adequacy of environmental, safety and health (ES and H) protection practices within the four DOE Remedial Action programs: Grand Junction Remedial Action Program (GJRAP), Uranium Mill Tailings Remedial Action Program (UMTRAP), Formerly Utilized Sites Remedial Action Program (FUSRAP), and Surplus Facilities Management Program (SFMP). APRA encompasses all ES and H practices of DOE and its contractors/subcontractors within the four Remedial Action programs. Specific activities of APRA include document reviews, selected site visits, and program office appraisals. Technical support and assistance to OOS is being provided by APRA contractors in the evaluation of radiological standards and criteria, quality assurance measures, radiation measurements, and risk assessment practices. This paper provides an overview of these activities and discusses program to date, including the roles of OOS and the respective contractors. The contractors involved in providing technical support and assistance to OOS are Aerospace Corporation, Oak Ridge Associated Universities, and Pacific Northwest Laboratory

  6. DOE's Assurance Program for Remedial Action (APRA)

    International Nuclear Information System (INIS)

    Denham, D.H.; Stenner, R.D.; Welty, C.G. Jr.; Needels, T.S.

    1984-10-01

    The US Department of Energy's (DOE) Office of Operational Safety (OOS) is presently developing and implementing the Assurance Program for Remedial Action (APRA) to overview DOE's Remedial Action programs. APRA's objective is to ensure the adequacy of environmental, safety and health (ES and H) protection practices within the four DOE Remedial Action programs: Grand Junction Remedial Action Program (GJRAP), Uranium Mill Tailings Remedial Action Program (UMTRAP), Formerly Utilized Sites Remedial Action Program (FUSRAP), and Surplus Facilities Management Program (SFMP). APRA encompasses all ES and H practices of DOE and its contractors/subcontractors within the four Remedial Action programs. Specific activities of APRA include document reviews, selected site visits, and program office appraisals. Technical support and assistance to OOS is being provided by APRA contractors in the evaluation of radiological standards and criteria, quality assurance measures, radiation measurements, and risk assessment practices. This paper provides an overview of these activities and discusses progress to date, including the roles of OOS and the respective contractors. The contractors involved in providing technical support and assistance to OOS are Aerospace Corporation, Oak Ridge Associated Universities, and Pacific Northwest Laboratory

  7. Development of a sitewide groundwater remediation strategy at the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Goswami, D.

    1996-01-01

    Over 440 km 2 (170 mi 2 ) of groundwater beneath the Hanford Site are contaminated by hazardous and radioactive waste, out of which almost half is over state and federal drinking water standards. In addition to the complicated nature of these plumes, remediation is further obscured by limited application of available technologies and hydrogeologic information. This paper briefly describes the processes used by the Washington State Department of Ecology (Ecology), U.S. Environmental Protection Agency, and U.S. Department of Energy (USDOE) in developing a sitewide groundwater remediation strategy for Hanford and its outcome. As an initial approach to sitewide groundwater remediation, the strategy is to remediate the major plumes found in the reactor areas (100 Area) adjacent to the Columbia River and contain the major plumes found in the Central Plateau region (200 Area). This approach was based mainly on the qualitative risk, stakeholder's and tribe's values, and available technical feasibility. The strategy emphasizes the use of existing treatment and extraction technology for the remediation of groundwater in combination with proposed and existing site infrastructure. This work is being performed in parallel with ongoing risk and other feasibility activities. Under this strategy, innovative technologies being developed are in the areas of dense nonaqueous phase liquid identification and recovery, and problems associated with strontium-90, cesium-137, and plutonium in the vadose zone and groundwater. The final remediation strategy alternatives remain a product of risk assessment, technical feasibility, site use scenario, and cost consideration. In order to develop a strategy for the final cleanup, several issues such as aquifer restoration, natural attenuation, potential contamination of groundwater from the tank farms and from the existing contamination source in the vadose zone must be looked in detail in conjuction with public and stakeholder's values

  8. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords

  9. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  10. Application of natural resource valuation concepts for development of sustainable remediation plans for groundwater.

    Science.gov (United States)

    Connor, John A; Paquette, Shawn; McHugh, Thomas; Gie, Elaine; Hemingway, Mark; Bianchi, Gino

    2017-12-15

    This paper explores the application of natural resource assessment and valuation procedures as a tool for developing groundwater remediation strategies that achieve the objectives for health and environmental protection, in balance with considerations of economic viability and conservation of natural resources. The natural resource assessment process, as applied under U.S. and international guidelines, entails characterization of groundwater contamination in terms of the pre-existing beneficial services of the impacted resource, the loss of these services caused by the contamination, and the measures and associated costs necessary to restore or replace the lost services. Under many regulatory programs, groundwater remediation objectives assume that the impacted groundwater may be used as a primary source of drinking water in the future, even if not presently in use. In combination with a regulatory preference for removal or treatment technologies, this assumed exposure, while protective of human health, can drive the remedy selection process toward remedies that may not be protective of the groundwater resource itself or of the other natural resources (energy, materials, chemicals, etc.) that may be consumed in the remediation effort. To achieve the same health and environmental protection goals under a sustainable remediation framework, natural resource assessment methods can be applied to restore the lost services and preserve the intact services of the groundwater so as to protect both current and future users of that resource. In this paper, we provide practical guidelines for use of natural resource assessment procedures in the remedy selection process and present a case study demonstrating the use of these protocols for development of sustainable remediation strategies. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  11. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  12. 200-UP-1 groundwater remedial design/remedial action work plan. Revision 1

    International Nuclear Information System (INIS)

    1997-07-01

    This 200-UP-1 remedial design report presents the objective and rationale developed for the design and implementation of the selected interim remedial measure for the 200-UP-1 Operable Unit, located in the 200 West Area of the Hanford Site

  13. Remedial action of radium contaminated residential properties

    International Nuclear Information System (INIS)

    White, D.; Eng, J.

    1986-01-01

    Since November 1983, the New Jersey Department of Environmental Protection (NJDEP) and the US Environmental Protection Agency (USEPA) have been in the process of identifying properties in Montclair, Glen Ridge and West Orange, New Jersey, which were built over radium contaminated soil landfilled areas. Elevated indoor radon concentrations prompted the Centers for Disease Control (CDC) to issue a health advisory which included permanent remediation of radon progeny levels in excess of 0.02 Working Levels within two years of discovery. In order to expedite remedial action, NJDEP undertook a ten million dollar cleanup program. Remedial Action at the 12 residential properties encountered some unanticipated problems despite the efforts of numerous government agencies and their contractors to characterize the contamination as much as possible prior to remediation. Some of the unanticipated issues include contamination from other radionuclides, underestimation of removal volumes, and controversy over the transportation and disposal of the radium contaminated soil at a commercial facility in Nevada. This paper will review the approach taken by NJDEP to the remedial action for radium contaminated soil, discuss some of the issues encountered during the remedial action, and provide post remedial action data

  14. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action.

  15. HANFORD GROUNDWATER REMEDIATION

    Energy Technology Data Exchange (ETDEWEB)

    CHARBONEAU, B; THOMPSON, M; WILDE, R.; FORD, B.; GERBER, M.S.

    2006-02-01

    geographically dispersed community is united in its desire to protect the Columbia River and have a voice in Hanford's future. This paper presents the challenges, and then discusses the progress and efforts underway to reduce the risk posed by contaminated groundwater at Hanford. While Hanford groundwater is not a source of drinking water on or off the Site, there are possible near-shore impacts where it flows into the Columbia River. Therefore, this remediation is critical to the overall efforts to clean up the Site, as well as protect a natural resource.

  16. Colloid remediation in groundwater by polyelectrolyte capture

    International Nuclear Information System (INIS)

    Nuttall, H.E.; Rao, S.; Jain, R.

    1992-01-01

    This paper describes an ongoing study to characterize groundwater colloids, to understand the geochemical factors affecting colloid transport in groundwater, and to develop an in-situ colloid remediation process. The colloids and suspended particulate matter used in this study were collected from a perched aquifer site that has radiation levels several hundred times the natural background and where previous researchers have measured and reported the presence of radiocolloids containing plutonium and americium. At this site, radionuclides have spread over several kilometers. Inorganic colloids collected from water samples are characterized with respect to concentration, mineralogy, size distribution, electrophoretic mobility (zeta potential), and radioactivity levels. Presented are the methods used to investigate the physiochemical factors affecting colloid transport and the preliminary analytical results. Included below are a description of a colloid transport model and the corresponding computational code, water analyses, characterization of the inorganic colloids, and a conceptual description of a process for in-situ colloid remediation using the phenomenon of polyelectrolyte capture

  17. Confirmatory radiological survey of the Grand Junction Projects Office Remedial Action Project exterior portions, 1989-1995

    International Nuclear Information System (INIS)

    Forbes, G.H.; Egidi, P.V.

    1997-04-01

    The purpose of this independent assessment was to provide the U.S. Department of Energy (DOE) with an independent verification (IV) that the soil at the Grand Junction Projects Office (GJPO) complies with applicable DOE guidelines. Oak Ridge National Laboratory/ Environmental Technology Section (ORNL/ETS) which is also located at the GJPO, was assigned by DOE as the Independent Verification Contractor (IVC). The assessment included reviews of the decontamination and decommissioning plan, annual environmental monitoring reports, data in the pre- and post-remedial action reports, reassessment reports and IV surveys. Procedures and field methods used during the remediation were reviewed, commented on, and amended as needed. The IV surveys included beta-gamma and gamma radiation scans, soil sampling and analyses. Based on the data presented in the post-remedial action report and the results of the IV surveys, the remediation of the outdoor portions of the GJPO has achieved the objectives. Residual deposits of uranium contamination may exist under asphalt because the original characterization was not designed to identify uranium and subsequent investigations were limited. The IVC recommends that this be addressed with the additional remediation. The IVC is working with the remedial action contractor (RAC) to assure that final documentation WM be sufficient for certification. The IVC will address additional remediation of buildings, associated utilities, and groundwater in separate reports. Therefore, this is considered a partial verification

  18. Planning risk communication for UMTRA project groundwater restoration

    Energy Technology Data Exchange (ETDEWEB)

    Hundertmark, Charles [Jacobs Engineering Group Inc. and University of Phoenix (United States); Hoopes, Jack [Jacobs Engineering Group Inc. (United States); Flowers, Len [Roy F. Weston Company (United States); Jackson, David G [U.S. Department of Energy (United States)

    1992-07-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  19. Planning risk communication for UMTRA project groundwater restoration

    International Nuclear Information System (INIS)

    Hundertmark, Charles; Hoopes, Jack; Flowers, Len; Jackson, David G.

    1992-01-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  20. Superfund Record of Decision (EPA Region 6): United Nuclear Corporation, Mckinley County, New Mexico, ground-water operable unit (first remedial action) September 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The United Nuclear Corporation (UNC) site is located approximately 17 miles northeast of Gallup, New Mexico in McKinley County. The site operated as a State-licensed uranium mill facility from June 1977 to May 1982. It includes an ore-processing mill (about 25 acres) and an unlined tailings pond area (about 100 acres). In July 1979, approximately 23 million gallons of tailings and pond water were released to a nearby river as a result of a dam breach in the tailings pond area. The site damage was repaired; however, attention was focused on ground-water contamination resulting from tailings seepage. Nevertheless, the offsite migration of radionuclides and chemical constituents from uranium milling byproduct materials into the ground water, as well as to surface water and air, are still principal threats at the site. The remedial action will address onsite ground water contamination. Source control and onsite surface reclamation will be implemented under the direction of the Nuclear Regulatory Commission and integrated with this ground water operable unit. The primary contaminants of concern affecting the ground water are metals including arsenic, and radioactive substances including radium-226/228 and gross alpha. The selected remedial action for the site is included

  1. Hydrodynamic analysis application of contaminated groundwater remediation to oil hydrocarbons

    Directory of Open Access Journals (Sweden)

    Pajić Predrag R.

    2017-01-01

    Full Text Available In this paper, the application of the hydrodynamic analysis in the selected ‘pumping and treatment’ remediation method of groundwater hydrocarbon pollution in the case of the Pancevo oil refinery is examined. The applied hydrodynamic analysis represents a regular and necessary approach in modern hydrogeology. Previous chemical analysis of soil and groundwater samples at observation objects revealed their pollution by oil products. New researches included the constraction of 12 piezometric boreholes of varying depths, geoelectric soil sounding, ‘in situ’ measurement of the present contaminant, detected as a hydrophobic phase of LNAPL, chemical analysis of soil and groundwater samples with emphasis on total petroleum hydrocarbons (TPH content, total fats and mineral oils, mercury cations and other characteristic compounds, etc. These researches define the volume of contamination issued by the ‘light’ (LNAPL contamination phase. The selected remediation method for this type of pollution is the ‘Pump and Treat’ method, which implies the pumping of contaminated groundwater from aquifer and their subsequent treatment. A hydrodynamic method was used to select the optimal hydrotechnical solution for LNAPL extraction. On the mathematical model, the prediction calculations for two variant solutions were carried out (‘hydraulic isolation’ and complex for the application of groundwater contamination remediation characterized as front pollution substance (by extraction and injection wells or infiltration pool. By extraction wells performing, it would be possible to remove the LNAPL from the surface of the water with special pumps-skimmers. The importance of the hydrodynamic method application is, in addition to the hydrotechnical solution selection for the LNAPL drainage, the provision of quality basis for the dimensioning of these objects based on the results of the groundwater balance.

  2. Y-12 Plant remedial action Technology Logic Diagram: Volume 3, Technology evaluation data sheets: Part A, Remedial action

    International Nuclear Information System (INIS)

    1994-09-01

    The Y-12 Plant Remedial Action Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) problems at the Y-12 Plant to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to remedial action (RA) activities. The TLD consists of three volumes. Volume 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the rankings of remedial technologies. Volume 2 contains the logic linkages among environmental management goals, environmental problems and the various technologies that have the potential to solve these problems. Volume 3 contains the TLD data sheets. This report is Part A of Volume 3 and contains the Remedial Action section

  3. Y-12 Plant remedial action Technology Logic Diagram: Volume 3, Technology evaluation data sheets: Part A, Remedial action

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Y-12 Plant Remedial Action Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) problems at the Y-12 Plant to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to remedial action (RA) activities. The TLD consists of three volumes. Volume 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the rankings of remedial technologies. Volume 2 contains the logic linkages among environmental management goals, environmental problems and the various technologies that have the potential to solve these problems. Volume 3 contains the TLD data sheets. This report is Part A of Volume 3 and contains the Remedial Action section.

  4. Remediation of TCE-contaminated groundwater using nanocatalyst and bacteria.

    Science.gov (United States)

    Kang, Ser Ku; Seo, Hyunhee; Sun, Eunyoung; Kim, Inseon; Roh, Yul

    2011-08-01

    The objective of this study was to develop and evaluate the remediation of trichloroethene (TCE)-contaminated groundwater using both a nanocatalyst (bio-Zn-magnetite) and bacterium (similar to Clostridium quinii) in anoxic environments. Of the 7 nanocatalysts tested, bio-Zn-magnetite showed the highest TCE dechlorination efficiency, with an average of ca. 90% within 8 days in a batch experiment. The column tests confirmed that the application of bio-Zn-magnetite in combination with the bacterium achieved high degradation efficiency (ca. 90%) of TCE within 5 days compared to the nanocatalyst only, which degraded only 30% of the TCE. These results suggest that the application of a nanocatalyst and the bacterium have potential for the remediation of TCE-contaminated groundwater in subsurface environments.

  5. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1993-08-01

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent groundwater contamination resulting from processing activities at inactive uranium milling sites (40 CFR 192). The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 designated responsibility to the US Department of Energy (DOE) for assessing the inactive uranium milling sites. The DOE has determined that each assessment shall include information on site characterization, a description of the proposed action, and a summary of the water resources protection strategy that describes how the proposed action will comply with the EPA groundwater protection standards. To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards, the US Department of Energy (DOE) proposes that supplemental standards be applied at the Dry Flats disposal site because of Class III (limited use) groundwater in the uppermost aquifer (the basal sandstone of the Cretaceous Burro Canyon Formation) based on low yield. The proposed remedial action will ensure protection of human health and the environment

  6. Waste minimization opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, site

    International Nuclear Information System (INIS)

    Hartmann, G.L.; Arp, S.; Hempill, H.

    1993-01-01

    At two uranium mill sites in Rifle, Colorado, the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is removing uranium mill tailings and contaminated subgrade soils. This remediation activity will result in the production of groundwater contaminated with uranium, heavy metals, ammonia, sulfates, and total dissolved solids (TDS). The initial remediation plan called for a wastewater treatment plant for removal of the uranium, heavy metals, and ammonia, with disposal of the treated water, which still includes the sulfates and TDSS, to the Colorado River. The National Pollutant Discharge Elimination (NPDES) permit issued by the Colorado Department of Health for the two Rifle sites contained more restrictive discharge limits than originally anticipated. During the detailed review of alternate treatment systems to meet these more restrictive limits, the proposed construction procedures were reviewed emphasizing the methods to minimize groundwater production to reduce the size of the water treatment facility, or to eliminate it entirely. It was determined that with changes to the excavation procedures and use of the contaminated groundwater for use in dust suppression at the disposal site, discharge to the river could be eliminated completely

  7. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  8. Remedial Action Program annual conference: Proceedings

    International Nuclear Information System (INIS)

    1990-01-01

    Within the DOE's Office of Environmental Restoration ampersand Waste Management, the Office of Environmental Restoration manages a number of programs whose purposes are to complete remedial actions at DOE facilities and sites located throughout the United States. The programs include the Surplus Facilities Management Program, the Formerly Utilized Sites Remedial Action Program, the Uranium Mill Tailings Remedial Action Program, and the West Valley Demonstration Project. These programs involve the decontamination and decommissioning of radioactively-contaminated structures and equipment, the disposal of uranium mill tailings, and the cleanup or restoration of soils and ground water that have been contaminated with radioactive or hazardous substances. Each year the DOE and DOE-contractor staff who conduct these programs meet to exchange information and experience in common technical areas. This year's meeting was hosted by the Uranium Mill Tailings Remedial Action Project, DOE-AL, and was held in Albuquerque, NM. This volume of proceedings is the record of that conference. The proceedings consist of abstracts, summaries, or actual text for each presentation made and any visual aids used by the speakers

  9. Comparison of doses, before and after remedial action

    International Nuclear Information System (INIS)

    Wallo, A. III

    1988-01-01

    The Division of Facility and Site Decommissioning Projects at DOE-Headquarters is evaluating potential doses from vicinity properties before and after remedial action at several sites using the RESRAD computer code. A preliminary review was completed for nineteen Colonie vicinity properties. This review indicated potential doses before remedial action at these sites ranged from about 43 to 2 mrem/year and after remediation between 5 and 0 mrem/year. These estimates indicate the conservatism in the DOE-derived soil decontamination remedial action. Following remedial action, the potential doses are on the order of those being considered to be below regulatory concern by EPA and NRC. The estimates made for these sites are still conservative due to the method used to determine the source term. More realistic assessments of source terms are anticipate dot significantly affect the after-remedial-action doses, possibly lowering them all to below 1 mrem/year. This evaluation is being refined with more realistic estimates of the source term, for all of the Colonie vicinity properties. Once the Colonie vicinity properties are completed, at least three other sites will be evaluated. It is hoped that this information will provide added confidence in the remedial action guidelines and more general acceptance of the guidelines by the EPA and others

  10. Decision process for Hanford sitewide groundwater remediation

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1996-06-01

    This document describes a decision process for planning future investigations and remediating contaminated groundwater at the Hanford Site in Richland, Washington. This decision process details the following: identifies key decisions and activities; defines the criteria used in making each decision; and defines the logic that links the decisions and the activities in a stepwise manner

  11. Proceedings (of the) first annual groundwater and soil remediation R, D and D (research, development and demonstration) symposium

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    A symposium was held to present results of research on the remediation of contamination of groundwater and soils. Papers were presented on groundwater/soil remediation research and demonstration programs, in-situ bioremediation, remediation of groundwater contaminated by gasoline-derived aromatics, solvent extraction of petroleum hydrocarbons from soil, bioreactors for cleaning hydrocarbon- and salt-contaminated soils, in-situ volatilization technologies, evaluations of spill cleanup technologies, remediating subsurface contamination around sour gas processing plants, and the influence of gasoline oxygenates on the persistence of aromatics in groundwater. Separate abstracts have been prepared for 9 papers from this symposium.

  12. The impact of abandoned coal gasification plants on groundwater and remediation strategies

    International Nuclear Information System (INIS)

    Werner, P.; Stieber, M.

    1997-01-01

    Areas of abandoned coal gasification-, cokeovenplants and town gasworks normally contain hazardous contaminants as there are among others PAHs, cyanides, mono aromatic compounds and phenols. Therefore a strong impact on the groundwater can be expected. In the thousands of sites existing in Germany a complete remediation is almost impossible. Combustion is the only safe way to eliminate the contaminants by mineralization; but is to expensive and not applicable for the large amount of soil to be treated. Soil washing and bio-remediation is limited by the composition of the contaminants on the one side and by the soil structure on the other. Therefore the success of the mentioned remediation techniques is normally weak and only in some selected cases efficient enough. A combination of different methods according the site characteristics might help to increase the efficiency. On the other hand it it obvious, that there are natural barriers integrated between the contaminants and the groundwater as there are e.g solubility adsorbability and biodegradability of the hazardous compounds and the distance to the groundwater. Recently developed methods for downstream groundwater remediation are presented and discussed for the application in gas work contaminations. Those so called 'passive systems' are said to be very economic and might help to prevent further distribution of the contaminants into the environment. (au)

  13. Remedial action and waste disposal project: 100-DR-1 remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Calverley, C.

    1996-08-01

    This plan presents the method used to assess the readiness of the 100- DR-1 Remedial Action Project. Remediation of the 100-D sites (located on the Hanford Site) involves the excavation (treatment if applicable) and final disposal of contaminated soil and debris associated with the high-priority waste sites in the 100 Areas

  14. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  15. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  16. Groundwater remediation at the Hanford site

    International Nuclear Information System (INIS)

    Fries, W.

    1993-01-01

    Ion exchange resin and adsorption technology has been used successfully to treat diversified types of toxic waste water for many years. Even though the Hanford Site presents many unique problems, the author believes these technologies can remediate the groundwater at this site. However, treatment of the sludge in tanks generally is beyond the pale of these technologies except for the possibility of experimental studies being performed at the University of Idaho (Troescher)

  17. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  18. Remedial Action Programs annual meeting: Proceedings

    International Nuclear Information System (INIS)

    1988-01-01

    Within the DOE's Office of Nuclear Energy, the Office of Remedial Action and Waste Technology manages a number of programs whose purposes are to complete remedial actions at DOE facilities and sites located throughout the United States. These programs include the Surplus Facilities Management Program, the Formerly Utilized Sites Remedial Action Program, the Uranium Mill Tailings remedial Action Program and the West Valley Demonstration Project. The programs involve the decontamination and decommissioning of radioactively-contaminated structures and equipment, the disposal of uranium mill tailings, and the cleanup or restoration of soils and ground water that have been contaminated with radioactive hazardous substances. Each year the DOE and DOE-contractor staff who conduct these programs meet to exchange information and experience in common technical areas. This year's meeting was hosted by the Surplus Facilities Management Program and was held near DOE Headquarters, in Gaithersburg, Maryland. This volume of proceedings provides the record for the meeting. The proceedings consist of abstracts for each presentation made at the meeting, and the visual aids (if any) used by the speakers. The material is organized in the following pages according to the five different sessions at the meeting: Session 1: Environmental Compliance--Policy; Session 2: Environmental Compliance--Practice; Session 3: Reports from working groups; Session 4: DandD Technology; and Session 5: Remedial Action Technology. The agenda for the meeting and the list of meeting registrants are provided in Appendix A and B, respectively. Individual papers are processed separately for the data base

  19. Biosensor-based diagnostics of contaminated groundwater: assessment and remediation strategy

    International Nuclear Information System (INIS)

    Bhattacharyya, Jessica; Read, David; Amos, Sean; Dooley, Stephen; Killham, Kenneth; Paton, Graeme I.

    2005-01-01

    Shallow groundwater beneath a former airfield site in southern England has been heavily contaminated with a wide range of chlorinated solvents. The feasibility of using bacterial biosensors to complement chemical analysis and enable cost-effective, and focussed sampling has been assessed as part of a site evaluation programme. Five different biosensors, three metabolic (Vibrio fischeri, Pseudomonas fluorescens 10568 and Escherichia coli HB101) and two catabolic (Pseudomonas putida TVA8 and E. coli DH5α), were employed to identify areas where the availability and toxicity of pollutants is of most immediate environmental concern. The biosensors used showed different sensitivities to each other and to the groundwater samples tested. There was generally a good agreement with chemical analyses. The potential efficacy of remediation strategies was explored by coupling sample manipulation to biosensor tests. Manipulation involved sparging and charcoal treatment procedures to simulate remediative engineering solutions. Sparging was sufficient at most locations. - Luminescent bacteria complement chemical analysis and support remediation technology

  20. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA [Environmental Protection Agency] standards (40 CFR Part 192)

    International Nuclear Information System (INIS)

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs

  1. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  2. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  3. An introduction to geographic information systems as applied to a groundwater remediation program

    International Nuclear Information System (INIS)

    Hammock, J.K.; Lorenz, R.

    1989-01-01

    While the attention to environmental issues has grown over the past several years, so has the focus on groundwater protection. Addressing the task of groundwater remediation often involves a large-scale program with numerous wells and enormous amounts of data. This data must be manipulated and analyzed in an efficient manner for the remediation program to be truly effective. Geographic Information System's (GIS) have proven to be an extremely effective tool in handling and interpreting this type of groundwater information. The purpose of this paper is to introduce the audience to GIS technology, describe how it is being used at the Savannah River Site (SRS) to handle groundwater data and demonstrate how it may be used in the corporate Westinghouse environment

  4. DOE`s approach to groundwater compliance on the UMTRA project

    Energy Technology Data Exchange (ETDEWEB)

    Metzler, D. [Dept. of Energy, Washington, DC (United States); Gibb, J.P. [Geraghty and Miller, Inc. (United States); Glover, W.A. [Roy F. Weston, Inc. (United States)

    1993-03-01

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists, a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.

  5. Sustainable Remediation for Enhanced NAPL Recovery from Groundwater

    Science.gov (United States)

    Javaher, M.

    2012-12-01

    Sustainable remediation relates to the achievement of balance between environmental, social, and economic elements throughout the remedial lifecycle. A significant contributor to this balance is the use of green and sustainable technologies which minimize environmental impacts, while maximizing social and economic benefits of remedial implementation. To this end, a patented mobile vapor energy generation (VEG) technology has been developed targeting variable applications, including onsite soil remediation for unrestricted reuse and enhanced non-aqueous phase liquid (NAPL) recover at the water table. At the core of the mobile VEG technology is a compact, high efficiency vapor generator, which utilizes recycled water and propane within an entirely enclosed system to generate steam as high as 1100°F. Operating within a fully enclosed system and capturing all heat that is generated within this portable system, the VEG technology eliminates all emissions to the atmosphere and yields an undetected carbon footprint with resulting carbon dioxide concentrations that are below ambient levels. Introduction of the steam to the subsurface via existing wells results in a desired change in the NAPL viscosity and the interfacial tension at the soil, water, NAPL interface; in turn, this results in mobilization and capture of the otherwise trapped, weathered NAPL. Approved by the California Air Resources Control Board (and underlying Air Quality Management Districts) and applied in California's San Joaquin Valley, in-well heating of NAPLs trapped at the water table using the VEG technology has proven as effective as electrical resistivity heating (ERH) in changing the viscosity of and mobilizing NAPLs in groundwater in support of recovery, but has achieved these results while minimizing the remedial carbon footprint by 90%, reducing energy use by 99%, and reducing remedial costs by more than 95%. NAPL recovery using VEG has also allowed for completion of source removal historically

  6. Prioritization and accelerated remediation of groundwater contamination in the 200 Areas of the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Wittreich, C.D.; Ford, B.H.

    1993-04-01

    The Hanford Site, operated by the US Department of Energy (DOE), occupies about 1,450 km 2 (560 mi 2 ) of the southeastern part of Washington State north of the confluence of the Yakima and Columbia Rivers. The Hanford Site is organized into numerically designated operational areas. The 200 Areas, located near the center of the Hanford Site, encompasses the 200 West, East and North Areas and cover an area of over 40 km 2 . The Hanford Site was originally designed, built, and operated to produce plutonium for nuclear weapons using production reactors and chemical reprocessing plants. Operations in the 200 Areas were mainly related to separation of special nuclear materials from spent nuclear fuel and contain related chemical and fuel processing and waste management facilities. Large quantities of chemical and radioactive waste associated with these processes were often disposed to the environment via infiltration structures such as cribs, ponds, ditches. This has resulted in over 25 chemical and radionuclide groundwater plumes, some of which have reached the Columbia River. An Aggregate Area Management Study program was implemented under the Hanford Federal Facility Agreement and Consent Order to assess source and groundwater contamination and develop a prioritized approach for managing groundwater remediation in the 200 Areas. This included a comprehensive evaluation of existing waste disposal and environmental monitoring data and the conduct of limited field investigations (DOE-RL 1992, 1993). This paper summarizes the results of groundwater portion of AAMS program focusing on high priority contaminant plume distributions and the groundwater plume prioritization process. The objectives of the study were to identify groundwater contaminants of concern, develop a conceptual model, refine groundwater contaminant plume maps, and develop a strategy to expedite the remediation of high priority contaminants through the implementation of interim actions

  7. Remediation of BTEX contaminated groundwater: best technology assessment between pump&treat and bioremediation by oxygen injection

    Directory of Open Access Journals (Sweden)

    Daniele Baldi

    2012-06-01

    Full Text Available The presence of benzene, toluene, ethylbenzene and xylene (BTEX dissolved in the groundwater and migrated from a light non-aqueous phase liquid (LNAPL source in an alluvial aquifer required a remedial action to be taken by the responsible party as established by the Italian regulation (Legislative Decree 152/06 and subsequent amendments. For such purpose, field investigations were conducted on site in order to define the site conceptual model and to identify the appropriate remediation technology to be applied. The remediation design was developed by means of a flow and reactive transport mathematical model, applied to saturated media, using the numerical codes MODFLOW and RT3D. Groundwater field observations showed evidence of occurring BTEX biodegradation processes by bacteria naturally present in the aquifer. Since such specific bacterial activity would be significantly enhanced by the injection of free oxygen in the aquifer, the performance of traditional pump and treat systems (P&T was assessed and compared with cost/efficiency of reactive oxygen bio-barrier technology (OD. The results showed a clear advantage in terms of cost/efficiency with the application of the OD. This presents an overall cost of about 30% of the P&T installation and maintenance, and it reaches remedial target in a shorter timeframe. Moreover, the system is also applicable as a bioremediation technology in case of Environmental Emergency Measures (MISE. The site examined is part of an industrial plant located in Central Italy.

  8. Application of Fe-Cu/Biochar System for Chlorobenzene Remediation of Groundwater in Inhomogeneous Aquifers

    OpenAIRE

    Xu Zhang; Yanqing Wu; Pingping Zhao; Xin Shu; Qiong Zhou; Zichen Dong

    2017-01-01

    Chlorobenzene (CB), as a typical Volatile Organic Contaminants (VOC), is toxic, highly persistent and easily migrates in water, posing a significant risk to human health and subsurface ecosystems. Therefore, exploring effective approaches to remediate groundwater contaminated by CB is essential. As an enhanced micro-electrolysis system for CB-contaminated groundwater remediation, this study attempted to couple the iron-copper bimetal with biochar. Two series of columns using sands with differ...

  9. Hydrodynamic analysis application of contaminated groundwater remediation to oil hydrocarbons

    OpenAIRE

    Pajić Predrag R.; Čalenić Aleksandar I.; Polomčić Dušan M.; Bajić Dragoljub I.

    2017-01-01

    In this paper, the application of the hydrodynamic analysis in the selected ‘pumping and treatment’ remediation method of groundwater hydrocarbon pollution in the case of the Pancevo oil refinery is examined. The applied hydrodynamic analysis represents a regular and necessary approach in modern hydrogeology. Previous chemical analysis of soil and groundwater samples at observation objects revealed their pollution by oil products. New researches included the constraction of 12 piezometric bor...

  10. Remediating Contaminant Plumes in Groundwater with Shallow Excavations Containing Coarse Reactive Media.

    Science.gov (United States)

    Hudak, Paul F

    2018-02-01

    A groundwater flow and mass transport model tested the capability of shallow excavations filled with coarse, reactive media to remediate a hypothetical unconfined aquifer with a maximum saturated thickness of 5 m. Modeled as contaminant sinks, the rectangular excavations were 10 m downgradient of an initial contaminant plume originating from a source at the top of the aquifer. The initial plume was approximately 259 m long, 23 m wide, and 5 m thick, with a downgradient tip located approximately 100 m upgradient of the site boundary. The smallest trench capable of preventing offsite migration was 11 m long (measured perpendicular to groundwater flow), 4 m wide (measured parallel to groundwater flow), and 3 m deep. Results of this study suggest that shallow trenches filled with coarse filter media that partially penetrate unconfined aquifers may be a viable alternative for remediating contaminated groundwater at some sites.

  11. Environmental restoration remedial action quality assurance requirements document

    International Nuclear Information System (INIS)

    Cote, R.F.

    1991-01-01

    The environmental Restoration Remedial Action Quality Assurance Requirements Document (DOE/RL 90-28) defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site, Richland, Washington. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency

  12. Laboratory study on sequenced permeable reactive barrier remediation for landfill leachate-contaminated groundwater

    International Nuclear Information System (INIS)

    Dong Jun; Zhao Yongsheng; Zhang Weihong; Hong Mei

    2009-01-01

    Permeable reactive barrier (PRB) was a promising technology for groundwater remediation. Landfill leachate-polluted groundwater riches in various hazardous contaminants. Two lab-scale reactors (reactors A and B) were designed for studying the feasibility of PRB to remedy the landfill leachate-polluted groundwater. Zero valent iron (ZVI) and the mixture of ZVI and zeolites constitute the first section of the reactors A and B, respectively; the second section of two reactors consists of oxygen releasing compounds (ORCs). Experimental results indicated that BOD 5 /COD increased from initial 0.32 up to average 0.61 and 0.6 through reactors A and B, respectively. Removal efficiency of mixed media for pollutants was higher than that of single media (ZVI only). Zeolites exhibited selective removal of Zn, Mn, Mg, Cd, Sr, and NH 4 + , and removal efficiency was 97.2%, 99.6%, 95.9%, 90.5% and 97.4%, respectively. The maximum DO concentration of reactors A and B were 7.64 and 6.78 mg/L, respectively, while the water flowed through the ORC. Therefore, sequenced PRB system was effective and was proposed as an alternative method to remedy polluted groundwater by landfill leachate

  13. The role of risk assessment in remedial action cleanup programs (RACP): A case history

    International Nuclear Information System (INIS)

    Fessler, R.G.; Bergmann, W.R.; Greenberg, A.J.

    1988-01-01

    A RACP (Remedial Action Cleanup Program) selects site cleanup criteria that protect human health and the environment and are cost effective. They generally use existing environmental standards and/or guidelines which include safe drinking water, RCRA groundwater protection, threshold limit values and air quality standards, and recommended soil cleanup level guidelines. If these are the only criteria used, the RACP may be more stringent and expensive than necessary. Another step, a risk assessment program, should then be considered in the cleanup decision process. A risk assessment uses chemical concentrations observed in soils, groundwater, and air to project their impact on human health and the environment. Toxicological data on human exposure to these concentrations (LD 50s and carcinogenic action levels) are used to assess risks to human health and the environment. The risk assessment also considers the probability of exposure. E.g., remedial programs at Superfund sites consider three criteria in order to assess risks to human health and the environment: (1) pathways of exposure, (2) population at risk, and (3) chemicals of concern. By eliminating or severely limiting the significance of any criteria, the site may no longer represent a significant risk. This paper presents a RACP case history where a risk assessment was needed to select a cost effective and environmentally acceptable cleanup program

  14. Effect of heterogeneity on enhanced reductive dechlorination: Analysis of remediation efficiency and groundwater acidification

    Science.gov (United States)

    Brovelli, A.; Lacroix, E.; Robinson, C. E.; Gerhard, J.; Holliger, C.; Barry, D. A.

    2011-12-01

    Enhanced reductive dehalogenation is an attractive in situ treatment technology for chlorinated contaminants. The process includes two acid-forming microbial reactions: fermentation of an organic substrate resulting in short-chain fatty acids, and dehalogenation resulting in hydrochloric acid. The accumulation of acids and the resulting drop of groundwater pH are controlled by the mass and distribution of chlorinated solvents in the source zone, type of electron donor, alternative terminal electron acceptors available and presence of soil mineral phases able to buffer the pH (such as carbonates). Groundwater acidification may reduce or halt microbial activity, and thus dehalogenation, significantly increasing the time and costs required to remediate the aquifer. In previous work a detailed geochemical and groundwater flow simulator able to model the fermentation-dechlorination reactions and associated pH change was developed. The model accounts for the main processes influencing microbial activity and groundwater pH, including the groundwater composition, the electron donor used and soil mineral phase interactions. In this study, the model was applied to investigate how spatial variability occurring at the field scale affects dechlorination rates, groundwater pH and ultimately the remediation efficiency. Numerical simulations were conducted to examine the influence of heterogeneous hydraulic conductivity on the distribution of the injected, fermentable substrate and on the accumulation/dilution of the acidic products of reductive dehalogenation. The influence of the geometry of the DNAPL source zone was studied, as well as the spatial distribution of soil minerals. The results of this study showed that the heterogeneous distribution of the soil properties have a potentially large effect on the remediation efficiency. For examples, zones of high hydraulic conductivity can prevent the accumulation of acids and alleviate the problem of groundwater acidification. The

  15. In Situ Monitoring of Groundwater Contamination Using the Kalman Filter For Sustainable Remediation

    Science.gov (United States)

    Schmidt, F.; Wainwright, H. M.; Faybishenko, B.; Denham, M. E.; Eddy-Dilek, C. A.

    2017-12-01

    Sustainable remediation - based on less intensive passive remediation and natural attenuation - has become a desirable remediation alternative at contaminated sites. Although it has a number of benefits, such as reduced waste and water/energy usage, it carries a significant burden of proof to verify plume stability and to ensure insignificant increase of risk to public health. Modeling of contaminant transport is still challenging despite recent advances in numerical methods. Long-term monitoring has, therefore, become a critical component in sustainable remediation. However, the current approach, which relies on sparse groundwater sampling, is problematic, since it could miss sudden significant changes in plume behavior. A new method is needed to combine existing knowledge about contaminant behavior and latest advances in in situ groundwater sensors. This study presents an example of the effective use of the Kalman filter approach to estimate contaminant concentrations, based on in situ measured water quality parameters (e.g. electrical conductivity and pH) along with the results of sparse groundwater sampling. The Kalman filter can effectively couple physical models and data correlations between the contaminant concentrations and in situ measured variables. We aim (1) to develop a framework capable of integrating different data types to provide accurate contaminant concentration estimates, (2) to demonstrate that these results remain reliable, even when the groundwater sampling frequency is reduced, and (3) to evaluate the future efficacy of this strategy using reactive transport simulations. This framework can also serve as an early warning system for detecting unexpected plume migration. We demonstrate our approach using historical and current groundwater data from the Savannah River Site (SRS) F-Area Seepage Basins to estimate uranium and tritium concentrations. The results show that the developed method can provide reliable estimates of contaminant

  16. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  17. Soil and ground-water remediation techniques

    International Nuclear Information System (INIS)

    Beck, P.

    1996-01-01

    Urban areas typically contain numerous sites underlain by soils or ground waters which are contaminated to levels that exceed clean-up guidelines and are hazardous to public health. Contamination most commonly results from the disposal, careless use and spillage of chemicals, or the historic importation of contaminated fill onto properties undergoing redevelopment. Contaminants of concern in soil and ground water include: inorganic chemicals such as heavy metals; radioactive metals; salt and inorganic pesticides, and a range of organic chemicals included within petroleum fuels, coal tar products, PCB oils, chlorinated solvents, and pesticides. Dealing with contaminated sites is a major problem affecting all urban areas and a wide range of different remedial technologies are available. This chapter reviews the more commonly used methods for ground-water and soil remediation, paying particular regard to efficiency and applicability of specific treatments to different site conditions. (author). 43 refs., 1 tab., 27 figs

  18. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  19. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy's (DOE's) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow

  20. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1983-12-01

    The FY 1983 project accomplishments are: completed the Remedial Action Plan and Phase I engineering design for the Canonsburg processing site; completed remedial action on an additional 52 vicinity properties and the inclusion of an additional 303 properties in the Uranium Mill Tailings Remedial Action Project; executed cooperative agreements with four states and the Navajo Nation; published the draft environmental impact statement for Salt Lake City site; and issued the approved Project Plan

  1. Groundwater flow in the Venice lagoon and remediation of the Porto Marghera industrial area (Italy)

    Science.gov (United States)

    Beretta, Giovanni Pietro; Terrenghi, Jacopo

    2017-05-01

    This study aims to determine the groundwater flow in a large area of the Venice (northeast Italy) lagoon that is under great anthropogenic pressure, which is influencing the regional flow in the surficial aquifer (about 30 m depth). The area presents several elements that condition the groundwater flow: extraction by means of drainage pumps and wells; tidal fluctuation; impermeable barriers that define part of the coastline, rivers and artificial channels; precipitation; recharge, etc. All the elements were studied separately, and then they were brought together in a numerical groundwater flow model to estimate the impact of each one. Identification of the impact of each element will help to optimise the characteristics of the Porto Marghera remediation systems. Longstanding industrial activity has had a strong impact on the soil and groundwater quality, and expensive and complex emergency remediation measures in problematic locations have been undertaken to ensure the continuity of industrial and maritime activities. The land reclamation and remediation works withdraw 56-74% of the water budget, while recharge from the river accounts for about 21-48% of the input. Only 21-42% of groundwater in the modelled area is derived from natural recharge sources, untouched by human activity. The drop of the piezometric level due to the realization of the upgradient impermeable barrier can be counteracted with the reduction of the pumping rate of the remediation systems.

  2. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment report

    International Nuclear Information System (INIS)

    Carson, J.W.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Remsen, W.E.; Tuttle, B.G.; Wilson, R.C.

    1997-09-01

    This report documents the readiness assessment for initial startup of the 300-FF-1 Remedial Action Task. A readiness assessment verifies and documents that field activities are ready to start (or restart) safely. The 300-FF-1 assessment was initiated in April 1997. Readiness assessment activities included confirming the completion of project-specific procedures and permits, training staff, obtaining support equipment, receipt and approval of subcontractor submittals, and mobilization and construction of site support systems. The scope of the 300-FF-1 Remedial Action Task includes excavation and disposal of contaminated soils at liquid waste disposal facilities and of waste in the 618-4 Burial Ground and the 300-FF-1 landfills. The scope also includes excavation of test pits and test trenches

  3. 49 CFR 805.735-27 - Disciplinary or remedial action.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Disciplinary or remedial action. 805.735-27... TRANSPORTATION SAFETY BOARD EMPLOYEE RESPONSIBILITIES AND CONDUCT § 805.735-27 Disciplinary or remedial action... cause for disciplinary action in addition to any penalty prescribed by Federal statute or regulation...

  4. Strategy paper. Remedial design/remedial action 100 Area. Revision 2

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1995-10-01

    This strategy paper identifies and defines the approach for remedial design and remedial action (RD/RA) for source waste sites in the 100 Area of the Hanford Site, located in southeastern Washington State. This paper provides the basis for the US Department of Energy (DOE) to assess and approve the Environmental Restoration Contractor's (ERC) approach to RD/RA. Additionally, DOE is requesting review/agreement from the US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) on the strategy presented in this document in order to expedite remedial activities

  5. 11 CFR 7.6 - Disciplinary and other remedial action.

    Science.gov (United States)

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Disciplinary and other remedial action. 7.6... Disciplinary and other remedial action. (a) A violation of this part by an employee or special Commission employee may be cause for appropriate disciplinary action which may be in addition to any penalty...

  6. Arsenic in the groundwater: Occurrence, toxicological activities, and remedies.

    Science.gov (United States)

    Jha, S K; Mishra, V K; Damodaran, T; Sharma, D K; Kumar, Parveen

    2017-04-03

    Arsenic (As) contamination in groundwater has become a geo-environmental as well as a toxicological problem across the globe affecting more than 100-million people in nearly 21 countries with its associated disease "arsenicosis." Arsenic poisoning may lead to fatal skin and internal cancers. In present review, an attempt has been made to generate awareness among the readers about various sources of occurrence of arsenic, its geochemistry and speciation, mobilization, metabolism, genotoxicity, and toxicological exposure on humans. The article also emphasizes the possible remedies for combating the problem. The knowledge of these facts may help to work on some workable remedial measure.

  7. Technical framework for groundwater restoration

    International Nuclear Information System (INIS)

    1991-04-01

    This document provides the technical framework for groundwater restoration under Phase II of the Uranium Mill Tailings Remedial Action (UMTRA) Project. A preliminary management plan for Phase II has been set forth in a companion document titled ''Preplanning Guidance Document for Groundwater Restoration''. General principles of site characterization for groundwater restoration, restoration methods, and treatment are discussed in this document to provide an overview of standard technical approaches to groundwater restoration

  8. A co-metabolic approach to groundwater remediation

    International Nuclear Information System (INIS)

    Palumbo, A.V.; Boerman, P.A.; Herbes, S.E.; White, D.C.; Strandberg, G.W.; Donaldson, T.L.; Lucero, A.J.; Jennings, H.L.; Phelps, T.J.; White, D.C.

    1991-01-01

    In support of the US Department of Energy's (DOE) Integrated Demonstration (Cleanup of Organics in Soils and Groundwater at Non-arid Sites) at the Savannah River Site (SRS), Oak Ridge National Laboratory (ORNL) and the University of Tennessee (UT) are involved in demonstrations of the use of methanotrophs in bioreactors for remediation of contaminated groundwater. In preparation for a field demonstration at ORNL's K-25 Site in Oak Ridge, Tennessee, ORNL is conducting batch experiments, is operating a number of bench-scale bioreactors, has designed pretreatment systems, and has modified a field-scale bioreactor provided by the Air Force Engineering and Services Center for use at the site. UT is operating benchscale bioreactors with the goal of determining the stability of a trichloroethylene-degrading methanotrophic consortia during shifts in operating conditions (e.g. pH, nutrient inputs, and contaminant mixtures). These activities are all aimed at providing the knowledge base necessary for successful treatment of contaminated groundwater at the SRS and K-25 sites as well as other DOE sites

  9. A co-metabolic approach to groundwater remediation

    International Nuclear Information System (INIS)

    Palumbo, A.V.; Boerman, P.A.; Strandberg, G.W.; Donaldson, T.L.; Jennings, H.L.; Lucero, A.J.; Herbes, S.E.; Phelps, T.J.; White, D.C.

    1991-01-01

    In support of the US Department of Energy's (DOE) Integrated Demonstration (Cleanup of Organics in Soils and Groundwater at Non-arid Sites) at the Savannah River Site (SRS), Oak Ridge National Laboratory (ORNL) and the University of Tennessee (UT) are involved in demonstrations of the use of methanotrophs in bioreactors for remediation of contaminated groundwater. In preparation for a field demonstration at ORNL's K-25 Site in Oak Ridge, Tennessee, ORNL is conducting batch experiments, is operating a number of bench-scale bioreactors, has designed pretreatment systems, and has modified a field-scale bioreactor provided by the Air Force Engineering and Services Center for use at the site. UT is operating bench-scale bioreactors with the goal of determining the stability of a trichloroethylene-degrading methanotrophic consortia during shifts in operating conditions (e.g. pH, nutrient inputs, and contaminant mixtures). These activities are all aimed at providing the knowledge base necessary for successful treatment of contaminated groundwater at the SRS and K-25 sites as well as other DOE sites. 18 refs., 1 fig. , 1 tab

  10. Carbon Nanotube Based Groundwater Remediation: The Case of Trichloroethylene

    Directory of Open Access Journals (Sweden)

    Kshitij C. Jha

    2016-07-01

    Full Text Available Adsorption of chlorinated organic contaminants (COCs on carbon nanotubes (CNTs has been gaining ground as a remedial platform for groundwater treatment. Applications depend on our mechanistic understanding of COC adsorption on CNTs. This paper lays out the nature of competing interactions at play in hybrid, membrane, and pure CNT based systems and presents results with the perspective of existing gaps in design strategies. First, current remediation approaches to trichloroethylene (TCE, the most ubiquitous of the COCs, is presented along with examination of forces contributing to adsorption of analogous contaminants at the molecular level. Second, we present results on TCE adsorption and remediation on pure and hybrid CNT systems with a stress on the specific nature of substrate and molecular architecture that would contribute to competitive adsorption. The delineation of intermolecular interactions that contribute to efficient remediation is needed for custom, scalable field design of purification systems for a wide range of contaminants.

  11. Carbon Nanotube Based Groundwater Remediation: The Case of Trichloroethylene.

    Science.gov (United States)

    Jha, Kshitij C; Liu, Zhuonan; Vijwani, Hema; Nadagouda, Mallikarjuna; Mukhopadhyay, Sharmila M; Tsige, Mesfin

    2016-07-21

    Adsorption of chlorinated organic contaminants (COCs) on carbon nanotubes (CNTs) has been gaining ground as a remedial platform for groundwater treatment. Applications depend on our mechanistic understanding of COC adsorption on CNTs. This paper lays out the nature of competing interactions at play in hybrid, membrane, and pure CNT based systems and presents results with the perspective of existing gaps in design strategies. First, current remediation approaches to trichloroethylene (TCE), the most ubiquitous of the COCs, is presented along with examination of forces contributing to adsorption of analogous contaminants at the molecular level. Second, we present results on TCE adsorption and remediation on pure and hybrid CNT systems with a stress on the specific nature of substrate and molecular architecture that would contribute to competitive adsorption. The delineation of intermolecular interactions that contribute to efficient remediation is needed for custom, scalable field design of purification systems for a wide range of contaminants.

  12. Pump-and-treat is not the only solution to aquifer remediation

    International Nuclear Information System (INIS)

    Odermatt, J.R.

    1994-01-01

    The Environmental Protection Agency (EPA) recently surveyed remediation technologies used at petroleum-contaminated sites in 22 states. About 96 percent of underground storage tank (UST) corrective action sites used some form of pump-and-treat technology to remediate contaminated groundwater. However, using only pump-and-treat technology is not a cost-effective approach to aquifer remediation. Pump-and-treat may be more appropriate for containing plumes or for use in initial emergency response actions at sites and massive NAPL releases to groundwater. As of 1990, 68 percent of Superfund records of decision selected pump-and-treat as the final remedy for aquifer remediation. However, of 13 sites where the remedial alternative objective was to restore the aquifer to health-based levels, only one pump-and-treat method has succeeded. Except in cases where human health and the environment are threatened, long-term active technologies, such as pump-and-treat, may not be warranted. Groundwater monitoring and possible wellhead treatment may be perceived as time-consuming processes; however, at many sites, this long-term approach may be far less costly and just as effective as other long-term strategies based on exclusive use of pump-and-treat technology

  13. In-situ remediation of brine impacted soils and groundwater using hydraulic fracturing, desalinization and recharge wells

    Energy Technology Data Exchange (ETDEWEB)

    Robertson, C. [Wiebe Environmental Services Inc., Calgary, AB (Canada); Ratiu, I. [GeoGrid Environmental Inc., Calgary, AB (Canada)

    2006-07-01

    This conference presentation focused on the in-stu remediation of brine impacted soils and groundwater using hydraulic fracturing, desalinization and recharge wells. A former oil battery was established in the 1940s, decommissioned in the late 1960s with a reclamation certificate issued in 1972. The land owner reported poor vegetative growth in the former battery area. The purpose of the study was to investigate the cause of poor growth and delineate contaminants of concern and to remediate impacted soil and groundwater associated with the former battery site. The investigation involved agrological, geophysical and hydrogeological investigation into the extent of anthropogenic impacts as well as the development of remediation options and plans to deal with issues of concern. The presentation provided the results of the investigation, options identified, and discussed limitation on salt remediation and treatment of saline soils. Other topics included hydraulic fracturing, injection wells that were installed to re-circulate treated groundwater though the salt plume, desalinization processes, and next steps. figs.

  14. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  15. Uranium Mill Tailings Remedial Action fiscal year 1992 roadmap

    International Nuclear Information System (INIS)

    1993-02-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is funded and managed as two separate projects: Surface remediation (UMTRA-S) and Groundwater compliance (UMTRA-G). Surface remediation is a Major System Acquisition and has been completed at 10 sites, 7 sites are under construction, and 7 sites are in the planning stage. The planning stages of the UMTRA-G Project, a major project, began in April 1991. A programmatic environmental impact statement (PEIS) has been started. Site characterization work and baseline risk assessment will begin FY 1993. Thus, the UMTRA-S Project is a mature and ongoing program with the roles of various organizations well defined, while the UMTRA-G Project is still being formulated and the interfaces between the DOE, states and tribes, and the EPA are being established. The Office of Environmental Restoration and Waste Management (EM) directed that all projects under its authority develop roadmaps for their activities. The UMTRA Project Roadmap was developed by the UMTRA Project Office with input from the TAC, RAC, the GJPO, and assistance from SAIC. A single roadmap has been prepared for both the UMTRA-S and UMTRA-G Projects. This was deemed appropriate due to the close relationship between the projects and to the fact that the same Government and contractor personnel are preparing the roadmaps. Roadmap development is a planning process that focuses on issue identification, root-cause analysis, and issues resolution. The methodology is divided into three phases: assessment, analysis, and issues resolution

  16. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  17. Strategy paper. Remedial design/remedial action 100 Area. Revision 1

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1995-07-01

    The purpose of this planning document is to identify and define the approach for remedial design and remedial action (RD/RA) in the 100 Area of the Hanford Site, located in southeastern Washington State. Additionally, this document will support the Hanford Site Environmental Restoration Contract (ERC) team, the US Department of Energy (DOE), and regulatory agencies in identifying and agreeing upon the complete process for expedited cleanup of the 100 Area

  18. Fluoride in groundwater: toxicological exposure and remedies.

    Science.gov (United States)

    Jha, S K; Singh, R K; Damodaran, T; Mishra, V K; Sharma, D K; Rai, Deepak

    2013-01-01

    Fluoride is a chemical element that is found most frequently in groundwater and has become one of the most important toxicological environmental hazards globally. The occurrence of fluoride in groundwater is due to weathering and leaching of fluoride-bearing minerals from rocks and sediments. Fluoride when ingested in small quantities (dental health by reducing dental caries, whereas higher concentrations (>1.5 mg/L) may cause fluorosis. It is estimated that about 200 million people, from among 25 nations the world over, may suffer from fluorosis and the causes have been ascribed to fluoride contamination in groundwater including India. High fluoride occurrence in groundwaters is expected from sodium bicarbonate-type water, which is calcium deficient. The alkalinity of water also helps in mobilizing fluoride from fluorite (CaF2). Fluoride exposure in humans is related to (1) fluoride concentration in drinking water, (2) duration of consumption, and (3) climate of the area. In hotter climates where water consumption is greater, exposure doses of fluoride need to be modified based on mean fluoride intake. Various cost-effective and simple procedures for water defluoridation techniques are already known, but the benefits of such techniques have not reached the rural affected population due to limitations. Therefore, there is a need to develop workable strategies to provide fluoride-safe drinking water to rural communities. The study investigated the geochemistry and occurrence of fluoride and its contamination in groundwater, human exposure, various adverse health effects, and possible remedial measures from fluoride toxicity effects.

  19. Unit environmental transport assessment of contaminants from Hanford's past-practice waste sites. Hanford Remedial Action Environmental Impact Statement

    International Nuclear Information System (INIS)

    Whelan, G.; Buck, J.W.; Castleton, K.J.

    1995-06-01

    The US Department of Energy, Richland Operations Office (DOE-RL) contracted Pacific Northwest Laboratory (PNL) to provide support to Advanced Sciences, Incorporated (ASI) in implementing tile regional no-action risk assessment in the Hanford Remedial Action Environmental Impact Statement. Researchers at PNL were charged with developing unit concentrations for soil, groundwater, surface water, and air at multiple locations within an 80-km radius from the center of tile Hanford installation. Using the Multimedia Environmental Pollutant Assessment System (MEPAS), PNL simulated (1) a unit release of one ci for each radionuclide and one kg for each chemical from contaminated soils and ponded sites, (2) transport of the contaminants in and through various environmental media and (3) exposure/risk of four exposure scenarios, outlined by the Hanford Site Baseline Remedial Action Methodology. These four scenarios include residential, recreational, industrial, and agricultural exposures. Spacially and temporally distributed environmental concentrations based on unit releases of radionuclides and chemicals were supported to ASI in support of the HRA-EIS. Risk for the four exposure scenarios, based on unit environment concentrations in air, water, and soil. were also supplied to ASI. This report outlines the procedure that was used to implement the unit transport portion of the HRA-EIS baseline risk assessment. Deliverables include unit groundwater, surface water, air, and soil concentrations at multiple locations within an 80-km radius from the center of the Hanford installation

  20. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1984-12-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project FY 1984 major accomplishments are summarized. Twenty-five percent of the processing site remedial actions at Canonsburg, PA, were completed. Remedial action on 118 vicinity properties at four designated locations were initiated and survey and inclusion activities on a total of 420 vicinity properties were completed. The Environmental Impact Statement (EIS) for Salt Lake City, UT, and the Environmental Assessment (EA) for Shiprock, NM were published, and the preliminary draft EIS for Durango, CO, was prepared. Remedial Action Plans (RAPs) for Salt Lake City, UT, and Shiprock, NM were completed, and draft RAPs for Gunnison, CO, and Riverton, WY were prepared. Cooperative agreements with Oregon, Wyoming, and South Dakota were executed, and the Utah cooperative agreement was modified to assign the construction management responsibility to the state. An Interagency Agreement with TVA for disposal of the Edgemont vicinity property material was executed

  1. Uranium Mill Tailings Remedial Action Amendments Act of 1988. Introduced in the Senate, One Hundredth Congress, Second Session, Report 100-543, September 23, 1988

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    The Committee on Energy and Natural Resources reported favorably on the Uranium Mill Tailings Remedial Action Amendments Act of 1987 (S.1991) with some amendments, the principal one being to change the 1987 date to 1988. The purpose of this bill is to authorize the Secretary of the Interior to transfer lands under the jurisdiction of the Bureau of Land Management to the Department of Energy for permanent surveillance and maintenance of remediated mill tailings as required by the Uranium Mill Tailings Radiation Control Act of 1978. The bill also extends the authority of the Secretary of Energy to perform remedial action at designated uranium mill tailings sites and vicinity properties until 30 September 1994. The authority to perform groundwater restoration activities is extended without limitation

  2. An Elitist Multiobjective Tabu Search for Optimal Design of Groundwater Remediation Systems.

    Science.gov (United States)

    Yang, Yun; Wu, Jianfeng; Wang, Jinguo; Zhou, Zhifang

    2017-11-01

    This study presents a new multiobjective evolutionary algorithm (MOEA), the elitist multiobjective tabu search (EMOTS), and incorporates it with MODFLOW/MT3DMS to develop a groundwater simulation-optimization (SO) framework based on modular design for optimal design of groundwater remediation systems using pump-and-treat (PAT) technique. The most notable improvement of EMOTS over the original multiple objective tabu search (MOTS) lies in the elitist strategy, selection strategy, and neighborhood move rule. The elitist strategy is to maintain all nondominated solutions within later search process for better converging to the true Pareto front. The elitism-based selection operator is modified to choose two most remote solutions from current candidate list as seed solutions to increase the diversity of searching space. Moreover, neighborhood solutions are uniformly generated using the Latin hypercube sampling (LHS) in the bounded neighborhood space around each seed solution. To demonstrate the performance of the EMOTS, we consider a synthetic groundwater remediation example. Problem formulations consist of two objective functions with continuous decision variables of pumping rates while meeting water quality requirements. Especially, sensitivity analysis is evaluated through the synthetic case for determination of optimal combination of the heuristic parameters. Furthermore, the EMOTS is successfully applied to evaluate remediation options at the field site of the Massachusetts Military Reservation (MMR) in Cape Cod, Massachusetts. With both the hypothetical and the large-scale field remediation sites, the EMOTS-based SO framework is demonstrated to outperform the original MOTS in achieving the performance metrics of optimality and diversity of nondominated frontiers with desirable stability and robustness. © 2017, National Ground Water Association.

  3. Nuclear Facilities Decommissioning and site remedial actions: a selected bibliography. Vol. 2

    International Nuclear Information System (INIS)

    Owen, P.T.; Fielden, J.M.; Knox, N.P.; Trotter, ES.

    1981-10-01

    This bibliography of 643 references represents the second in a series on nuclear facility decommissioning and site remedial actions to be produced by the Radiation Effects Information Center (REIC) within the Information Center Complex, Information Division, Oak Ridge National Laboratory. The bibliography contains scientific, technical, economic, and regulatory information pertaining to the US Department of Energy's Remedial Action Program. Major chapters are: Surplus Facilities Management Program; Nuclear Facilities Decommissioning; Formerly Utilized Sites Remedial Action Program; and Uranium Mill Tailings Management. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by title. Indexes are provided for: (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. The bibliography was compiled from a specialized data base established and maintained by REIC to provide information support for the US Department of Energy's Remedial Action Program, under the cosponsorship of its four major components: Surplus Facilities Management Program; Formerly Utilized Sites Remedial Action Program; Uranium Mill Tailings Remedial Action Program; and the Grand Junction Remedial Action Program

  4. Environmental Restoration Remedial Action quality assurance requirements document

    International Nuclear Information System (INIS)

    1991-01-01

    This document defines the quality assurance requirements for the US Department of Energy-Richland Operations Office Environmental Restoration Remedial Action program at the Hanford Site. The Environmental Restoration Remedial Action program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency. This document combines quality assurance requirements from various source documents into one set of requirements for use by the US Department of Energy-Richland Operations Office and other Environmental Restoration Remedial Action program participants. This document will serve as the basis for developing Quality Assurance Program Plans and implementing procedures by the participants. The requirements of this document will be applied to activities affecting quality, using a graded approach based on the importance of the item, service, or activity to the program objectives. The Quality Assurance Program that will be established using this document as the basis, together with other program and technical documents, form an integrated management control system for conducting the Environmental Restoration Remedial Action program activities in a manner that provides safety and protects the environment and public health

  5. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    International Nuclear Information System (INIS)

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado

  6. 49 CFR 1019.6 - Disciplinary and other remedial action.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Disciplinary and other remedial action. 1019.6... SURFACE TRANSPORTATION BOARD EMPLOYEES § 1019.6 Disciplinary and other remedial action. Any violation of the regulations in this part by an employee shall be cause for appropriate disciplinary or other...

  7. Superfund Record of Decision (EPA Region 9): North Hollywood/Burbank Well Field Area 1, San Fernando Valley Site, California (first remedial action), September 1987. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-24

    The North Hollywood - Burbank Well Field (NHBWF) is located within the San Fernando Valley Ground Water basin, which can provide drinking water for approximately 500,000 people residing in the San Fernando Valley and Los Angeles. In 1980 TCE and PCE were discovered in 25% of DWP's wells. In July 1981, DWP and the Southern California Association of Governments began a two-year study funded by EPA. The study revealed the occurrence of ground-water contamination plume patterns that are spreading toward the southeast. The primary contaminant of concern to the ground-water is TCE with PCE and other VOCs present. The selected remedial action for the site is ground-water pump and treatment using aeration and granular-activated-carbon - air-filtering units, with discharge to the DWP Pumping Station for chlorination and distribution. Spent carbon will be removed and replaced with fresh carbon, with the spent carbon scheduled either for disposal or regeneration. The estimated capital cost for this remedial action is $2,192,895 with present worth OandM of $2,284,105.

  8. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568

  9. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

  10. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    International Nuclear Information System (INIS)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description

  11. 19 CFR 200.735-104 - Disciplinary and other remedial action.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Disciplinary and other remedial action. 200.735... RESPONSIBILITIES AND CONDUCT General Provisions § 200.735-104 Disciplinary and other remedial action. (a) An employee who violates any of the regulations in this part may be disciplined. The disciplinary action may...

  12. 47 CFR 19.735-107 - Disciplinary and other remedial action.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Disciplinary and other remedial action. 19.735... RESPONSIBILITIES AND CONDUCT General Provisions § 19.735-107 Disciplinary and other remedial action. (a) A violation of the regulations in this part by an employee may be cause for appropriate disciplinary action...

  13. 15 CFR 0.735-40 - Disciplinary and other remedial action.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Disciplinary and other remedial action... RESPONSIBILITIES AND CONDUCT Administration § 0.735-40 Disciplinary and other remedial action. (a) Violation of a requirement established in or pursuant to this part shall be cause for appropriate disciplinary action, which...

  14. 1998 Comprehensive TNX Area Annual Groundwater and Effectiveness Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    Chase, J.

    1999-06-02

    Shallow groundwater beneath the TNX Area at the Savannah River Site has been contaminated with chlorinated volatile organic compounds such as trichloroethylene and carbon tetrachloride. The Interim Action T-1 Air Stripper System began operation on September 16, 1996. A comprehensive groundwater monitoring program was initiated to measure the effectiveness of the system. The Interim Action is meeting its objectives and is capable of continuing to do so until the final groundwater remedial action is in place.

  15. Soil and groundwater remediation through the program of energy research and development at Environment Canada

    International Nuclear Information System (INIS)

    Bacchus, P.

    2005-01-01

    Research and development in groundwater and soil remediation within the federal Program of Energy Research and Development (PERD) are conducted in the context of activities related to the oil and gas industry. Contamination of groundwater and soil by the oil and gas sector affects the health of ecosystems and the economic viability of impacted lands. This paper presented an outline of remediation research and development activities associated with PERD, as well as an overview of PERD's development of improved generic remediation technologies and approaches for use by industries. In addition, issues concerning the development of key guidelines, methods and protocols for use by regulators were discussed. Science and technology efforts within PERD contribute to the development of national standards and guidelines concerning public safety and environmental needs

  16. Electrochemical remediation technologies for soil and groundwater

    Energy Technology Data Exchange (ETDEWEB)

    Doering, F. [Electrochemical Processes I.I. c. Valley Forge, PA (United States)]|[P2 Soil Remediation, Inc. Stuttgart (Germany); Doering, N. [P2 Soil Remediation, Inc. Stuttgart (Germany)

    2001-07-01

    In Direct Current Technologies (DCTs) a direct current electricity is passed between at least two subsurface electrodes in order to effect the remediation of the groundwater and/or the soil. DCTs in line with the U.S.-terminology comprise of the ElectroChemical Remediation Technologies (ECRTs), and GeoKinetics. The primary distinction between ECRTs and ElectroKinetics are the power input, and the mode of operation, which are electrochemical reactions vs. mass transport. ECRTs combine phenomena of colloid (surface) electrochemistry with the phenomena of Induced Polarization (IP). This report focuses on ECRTs, comprising of the ElectroChemical GeoOxidation (ECGO) for the mineralization of organic pollutants to finally carbon dioxide and water, and Induced Complexation (IC), related to the electrochemical conversion of metals enhancing the mobilization and precipitation of heavy metals on both electrodes. Both technologies are based on reduction-oxidation (redox) reactions at the scale of the individual soil particles. (orig.)

  17. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

  18. Optimal groundwater remediation using artificial neural networks and the genetic algorithm

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, Leah L. [Stanford Univ., CA (United States)

    1992-08-01

    An innovative computational approach for the optimization of groundwater remediation is presented which uses artificial neural networks (ANNs) and the genetic algorithm (GA). In this approach, the ANN is trained to predict an aspect of the outcome of a flow and transport simulation. Then the GA searches through realizations or patterns of pumping and uses the trained network to predict the outcome of the realizations. This approach has advantages of parallel processing of the groundwater simulations and the ability to ``recycle`` or reuse the base of knowledge formed by these simulations. These advantages offer reduction of computational burden of the groundwater simulations relative to a more conventional approach which uses nonlinear programming (NLP) with a quasi-newtonian search. Also the modular nature of this approach facilitates substitution of different groundwater simulation models.

  19. Optimal groundwater remediation using artificial neural networks and the genetic algorithm

    International Nuclear Information System (INIS)

    Rogers, L.L.

    1992-08-01

    An innovative computational approach for the optimization of groundwater remediation is presented which uses artificial neural networks (ANNs) and the genetic algorithm (GA). In this approach, the ANN is trained to predict an aspect of the outcome of a flow and transport simulation. Then the GA searches through realizations or patterns of pumping and uses the trained network to predict the outcome of the realizations. This approach has advantages of parallel processing of the groundwater simulations and the ability to ''recycle'' or reuse the base of knowledge formed by these simulations. These advantages offer reduction of computational burden of the groundwater simulations relative to a more conventional approach which uses nonlinear programming (NLP) with a quasi-newtonian search. Also the modular nature of this approach facilitates substitution of different groundwater simulation models

  20. Groundwater re-injection at Fernald: Its role in accelerating the aquifer remedy

    International Nuclear Information System (INIS)

    Broberg, Kenneth A.; Janke, Robert

    2000-01-01

    A successful field-scale demonstration of the use of groundwater re-injection at the Fernald Environmental Management Project (FEMP) was recently completed, bringing the U.S. Department of Energy one step closer to achieving an accelerated site remediation. The demonstration marks the end of a several-year effort to evaluate (a) whether re-injection could be conducted efficiently at Fernald and (b) whether the approved aquifer remedy at Fernald would benefit from incorporating re-injection

  1. Current Conditions Risk Assessment for the 300-FF-5 Groundwater Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Miley, Terri B.; Bunn, Amoret L.; Napier, Bruce A.; Peterson, Robert E.; Becker, James M.

    2007-11-01

    This report updates a baseline risk assessment for the 300 Area prepared in 1994. The update includes consideration of changes in contaminants of interest and in the environment that have occurred during the period of interim remedial action, i.e., 1996 to the present, as well as the sub-regions, for which no initial risk assessments have been conducted. In 1996, a record of decision (ROD) stipulated interim remedial action for groundwater affected by releases from 300 Area sources, as follows: (a) continued monitoring of groundwater that is contaminated above health-based levels to ensure that concentrations continue to decrease, and (b) institutional controls to ensure that groundwater use is restricted to prevent unacceptable exposure to groundwater contamination. In 2000, the groundwater beneath the two outlying sub-regions was added to the operable unit. In 2001, the first 5-year review of the ROD found that the interim remedy and remedial action objectives were still appropriate, although the review called for additional characterization activities. This report includes a current conditions baseline ecological and human health risk assessment using maximum concentrations in the environmental media of the 300-FF-5 Operable Unit and downstream conditions at the City of Richland, Washington. The scope for this assessment includes only current measured environmental concentrations and current use scenarios. Future environmental concentrations and future land uses are not considered in this assessment.

  2. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 7

    International Nuclear Information System (INIS)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.; Fowler, J.W.

    1986-09-01

    The 644 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the seventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. References are arranged alphabetically by leading author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations

  3. Developing a disposal and remediation plan

    International Nuclear Information System (INIS)

    Messier, T.S.

    1999-01-01

    The environmental release of wastes generated by the upstream oil and gas industry in Alberta can result in polluted soil and groundwater at several facilities across the province. Responsibility for decommissioning upstream oil and gas facilities falls under the jurisdiction of the Alberta Energy and Utilities Board (EUB) and Alberta Environmental Protection (AEP). This paper outlines a protocol that can serve as a framework for the development of a plan to dispose of oilfield waste and to remediate related contaminated soils. The components involved in developing a disposal and remediation plan for oilfield wastes are: (1) identifying the potential source of pollution and oilfield waste generation, (2) characterizing oilfield wastes, (3) determining the nature and extent of soil and groundwater pollution, (4) preparing a remedial action plan, (5) assessing the viability of various remediation options, and (6) preparing health and safety plan. 12 refs., 2 tabs., 2 figs

  4. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  5. Department of Energy hazardous waste remedial actions program: Quality assurance program

    International Nuclear Information System (INIS)

    Horne, T.E.

    1988-01-01

    This paper describes the Quality Assurance Program developed for the Hazardous Waste Remedial Actions Program Support Contractor Office (HAZWRAP SCO). Key topics discussed include an overview of the HAZWRAP SCO mission and organization, the basic quality assurance program requirements and the requirements for the control of quality for the Department of Energy and Work for Others hazardous waste management programs, and the role of ensuring quality through the project team concept for the management of remedial response actions. The paper focuses on planning for quality assurance for this remedial waste management process from preliminary assessments of remedial sites to feasibility studies. Some observations concerning the control of quality during the implementation of remedial actions are presented. (2 refs.)

  6. Hanford statewide groundwater flow and transport model calibration report

    International Nuclear Information System (INIS)

    Law, A.; Panday, S.; Denslow, C.; Fecht, K.; Knepp, A.

    1996-04-01

    This report presents the results of the development and calibration of a three-dimensional, finite element model (VAM3DCG) for the unconfined groundwater flow system at the Hanford Site. This flow system is the largest radioactively contaminated groundwater system in the United States. Eleven groundwater plumes have been identified containing organics, inorganics, and radionuclides. Because groundwater from the unconfined groundwater system flows into the Columbia River, the development of a groundwater flow model is essential to the long-term management of these plumes. Cost effective decision making requires the capability to predict the effectiveness of various remediation approaches. Some of the alternatives available to remediate groundwater include: pumping contaminated water from the ground for treatment with reinjection or to other disposal facilities; containment of plumes by means of impermeable walls, physical barriers, and hydraulic control measures; and, in some cases, management of groundwater via planned recharge and withdrawals. Implementation of these methods requires a knowledge of the groundwater flow system and how it responds to remedial actions

  7. Soil and groundwater remediation guidelines for methanol

    International Nuclear Information System (INIS)

    2010-12-01

    Methanol is used by oil and gas operators to inhibit hydrate formation in the recovery of heavy oils, in natural gas production and transport, as well as in various other production applications. Emissions from methanol primary occur from miscellaneous solvent usage, methanol production, end-product manufacturing, and storage and handling losses. This document provided soil and groundwater remediation guidelines for methanol releases into the environment. The guidelines were consistent with the Alberta Environment tier 1 soil and groundwater framework. The chemical and physical properties of methanol were reviewed. The environmental fate and behavior of methanol releases was discussed, and the behaviour and effects of methanol in terrestrial and aquatic biota were evaluated. The toxicity of methanol and its effects in humans and mammalian species were reviewed. Soil quality and ground water quality guidelines were presented. Surface water and soil guideline calculation methods were provided, and ecological exposure and ground water pathways were discussed. Management limits for methanol concentrations were also provided. 162 refs., 18 tabs., 4 figs.

  8. ERC hazard classification matrices for above ground structures and groundwater and soil remediation activities

    International Nuclear Information System (INIS)

    Curry, L.R.

    1997-01-01

    This document provides the status of the preliminary hazard classification (PHC) process for the Environmental Restoration Contractor (ERC) above ground structures and groundwater and soil remediation activities currently underway for planned for fiscal year (FY) 1997. This classification process is based on current US Department of Energy (DOE), Richland Operations Office (RL) guidance for the classification of facilities and activities containing radionuclide and nonradiological hazardous material inventories. The above ground structures presented in the matrices were drawn from the Bechtel Hanford, Inc. (BHI) Decontamination and Decommissioning (D and D) Project Facility List (DOE 1996), which identifies the facilities in the RL-Environmental Restoration baseline contract in 1997. This document contains the following two appendices: (1) Appendix A, which consists of a matrix identifying PHC documents that have been issued for BHI's above ground structures and groundwater and soil remediation activities underway or planned for FY 1997, and (2) Appendix B, which consists of a matrix showing anticipated PHCs for above ground structures, and groundwater and soil remediation activities underway or planned for FY 1997. Appendix B also shows the schedule for finalization of PHCs for above ground structures with an anticipated classification of Nuclear

  9. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    International Nuclear Information System (INIS)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas

  10. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  11. Optimized remedial groundwater extraction using linear programming

    International Nuclear Information System (INIS)

    Quinn, J.J.

    1995-01-01

    Groundwater extraction systems are typically installed to remediate contaminant plumes or prevent further spread of contamination. These systems are expensive to install and maintain. A traditional approach to designing such a wellfield uses a series of trial-and-error simulations to test the effects of various well locations and pump rates. However, the optimal locations and pump rates of extraction wells are difficult to determine when objectives related to the site hydrogeology and potential pumping scheme are considered. This paper describes a case study of an application of linear programming theory to determine optimal well placement and pump rates. The objectives of the pumping scheme were to contain contaminant migration and reduce contaminant concentrations while minimizing the total amount of water pumped and treated. Past site activities at the area under study included disposal of contaminants in pits. Several groundwater plumes have been identified, and others may be present. The area of concern is bordered on three sides by a wetland, which receives a portion of its input budget as groundwater discharge from the pits. Optimization of the containment pumping scheme was intended to meet three goals: (1) prevent discharge of contaminated groundwater to the wetland, (2) minimize the total water pumped and treated (cost benefit), and (3) avoid dewatering of the wetland (cost and ecological benefits). Possible well locations were placed at known source areas. To constrain the problem, the optimization program was instructed to prevent any flow toward the wetland along a user-specified border. In this manner, the optimization routine selects well locations and pump rates so that a groundwater divide is produced along this boundary

  12. Electrical imaging of subsurface nanoparticle propagation for in-situ groundwater remediation

    Science.gov (United States)

    Flores Orozco, Adrián; Gallistl, Jakob; Schmid, Doris; Micic Batka, Vesna; Bücker, Matthias; Hofmann, Thilo

    2017-04-01

    Application of nanoparticles has emerged as a promising in situ remediation technology for the remediation of contaminated groundwater, particularly for areas difficult to access by other remediation techniques. The performance of nanoparticle injections, as a foremost step within this technology, is usually assessed through the geochemical analysis of soil and groundwater samples. This approach is not well suited for a real-time monitoring, and often suffers from a poor spatio-temporal resolution and only provides information from areas close to the sampling points. To overcome these limitations we propose the application of non-invasive Induced Polarization (IP) imaging, a geophysical method that provides information on the electrical properties of the subsurface. The analysis of temporal changes in the electrical images allows tracking the propagation of the injected nanoparticle suspension and detection of the induced bio-geochemical changes in the subsurface. Here, we present IP monitoring results for data collected during the injection of Nano-Goethite particles (NGP) used for simulation of biodegradation of a BTEX plume (i.e., benzene, toluene, ethylbenzene, and xylene) at the Spolchemie II site, CZ. Frequency-domain IP measurements were collected parallel to the groundwater flow direction and centred on the NGP injection point. Pre-injection imaging results revealed high electrical conductivities (> 10 S/m) and negligible polarization effects in the BTEX-contaminated part of the saturated zone (below 5 m depth). The apparently contradictory observation - BTEX compounds are poor electrical conductors - can be explained by the release of carbonic acids (a metabolic by-product of the biodegradation of hydrocarbons), which leads to an increase of the electrical conductivity. Post-injection images revealed a significant decrease (> 50%) of the electrical conductivity, with even larger changes in the proximity of the injection points, most likely due to the

  13. 22 CFR 146.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-04-01

    ... THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 146.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the...

  14. Explanation of significant differences for the TNX groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1997-01-01

    This Explanation of Significant Differences (ESD) is being issued by the Department of Energy (DOE), the lead agency for the Savannah River Site (SRS), with concurrence by the Environmental Protection Agency-Region IV (EPA) and South Carolina Department of Health and Environmental Control (SCDHEC) to announce changes in the interim remediation strategy selected for the TNX Groundwater Operable Unit. The TNX Area is located adjacent to the Savannah River in the southwestern portion of SRS. The remedy selected in the Interim Record of Decision (IROD) to achieve the interim action goals was the Hybrid Groundwater Corrective Action (HGCA). The HGCA consisted of a recirculation well system and an air stripper with a series of groundwater extraction wells. The original remediation strategy needs to be modified because the recirculation well system was determined to be ineffective in this area due to geological factors and the nature of the contamination

  15. 49 CFR 25.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-10-01

    ... ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 25.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the...

  16. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

  17. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints

  18. Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-07-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives

  19. Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-09-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime's, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives

  20. Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

  1. Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives.

  2. CENTRAL PLATEAU REMEDIATION

    International Nuclear Information System (INIS)

    ROMINE, L.D.

    2006-01-01

    A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach to Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress

  3. 32 CFR 196.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Remedial and affirmative action and self... SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS... action and self-evaluation. (a) Remedial action. If the designated agency official finds that a recipient...

  4. Hanford Site Groundwater Protection Management Program: Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime, (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site

  5. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    International Nuclear Information System (INIS)

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764

  6. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P. T.; Webb, J. R.; Knox, N. P.; Goins, L. F.; Harrell, R. E.; Mallory, P. K.; Cravens, C. D.

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  7. Grand challenge problems in environmental modeling and remediation: groundwater contaminant transport

    Energy Technology Data Exchange (ETDEWEB)

    Todd Arbogast; Steve Bryant; Clint N. Dawson; Mary F. Wheeler

    1998-08-31

    This report describes briefly the work of the Center for Subsurface Modeling (CSM) of the University of Texas at Austin (and Rice University prior to September 1995) on the Partnership in Computational Sciences Consortium (PICS) project entitled Grand Challenge Problems in Environmental Modeling and Remediation: Groundwater Contaminant Transport.

  8. Assessment of international remedial technologies for application to Superfund sites

    International Nuclear Information System (INIS)

    Sanning, D.E.

    1990-01-01

    This paper presents some of the logical arguments for conducting research on remedial technologies for contaminated land and groundwater at an international level. It gives information on many of the international organizations that are involved in environmental programs, but it especially gives emphasis to the NATO-CCMS pilot study on Demonstration of Remedial Action Technologies for Contaminated Land and Groundwater. The purpose of the study is to field demonstrate and evaluate new/innovative technologies for remedial action at uncontrolled hazardous waste sites. This study is a logical international extension of the US EPA SITE program. It offers the opportunity to obtain a multiple data base on various remedial action unit processes without any single country having to commit a disproportionate amount of its internal resources to any specific activity. Each participating country provides the necessary resources for those demonstrations which they are contributing to the study. Sites are selected by a majority vote of all participating countries (no country is permitted to vote for its own sites). The study is a 5 year program with participants from Canada, Denmark, Federal Republic of Germany, France, Greece, Italy, Japan, the Netherlands, Norway, Spain, and the US. The need for cost-effective remedial action technologies for hazardous waste sites is a problem of all industrialized countries. The need to build a knowledge base of emerging remedial technologies was the impetus behind the USEPA's lead role and commitment to this pilot study

  9. Monitored Natural Attenuation as a Remediation Strategy for Nuclear Power Plant Applications

    Science.gov (United States)

    Kim, K.; Bushart, S.

    2009-12-01

    A NRC Information Notice (IN 2006-13) was produced to inform holders of nuclear operating licenses “of the occurrence of radioactive contamination of ground water at multiple facilities due to undetected leakage from facility structures, systems, or components (SSCs) that contain or transport radioactive fluids” so that they could consider actions, as appropriate, to avoid similar problems. To reinforce their commitment to environmental stewardship the nuclear energy industry has committed to improving management of situations that have the potential to lead to the inadvertent release of radioactive fluids. This Industry Groundwater Protection Initiative, finalized in June 2007 as [NEI 07-07], calls for implementation and improvement of on-site groundwater monitoring programs and enhanced communications with stakeholders and regulators about situations related to inadvertent releases. EPRI developed its Groundwater Protection Program to provide the nuclear energy industry with the technical support needed to implement the Industry Groundwater Initiative. An objective of the EPRI Groundwater Protection Program is to provide the nuclear industry with technically sound guidance for implementing and enhancing on-site groundwater monitoring programs. EPRI, in collaboration with the EPRI Groundwater Protection Committee of utility members, developed the EPRI Groundwater Protection Guidelines for Nuclear Power Plants (EPRI Report 1015118, November 2007), which provides site-specific guidance for implementing a technically sound groundwater monitoring program. The guidance applies a graded approach for nuclear plants to tailor a technically effective and cost efficient groundwater monitoring program to the site’s hydrogeology and risk for groundwater contamination. As part of the Groundwater Protection Program, EPRI is also investigating innovative remediation technologies for addressing low-level radioactive contamination in soils and groundwater at nuclear power

  10. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  11. An innovative funnel and gate approach to groundwater remediation

    International Nuclear Information System (INIS)

    Johnson, D.O.; Wilkey, M.L.; Willis, J.M.

    1996-01-01

    The US Department of Energy, office of Science and Technology (EM-50) sponsored a demonstration project of the Barrier Member Containment Corporation's patented EnviroWall trademark system at the Savannah River site. With this system, contaminated groundwater can be funneled into a treatment system without pumping the contaminated water to the surface. The EnviroWall trademark barrier and pass-through system, an innovative product of sic years of research and development, provides a means to enhance groundwater flow on the upgradient side of an impermeable wall and direct it to an in situ treatment system. The EnviroWall trademark system is adaptable to most site conditions. Remedial applications range form plume containment to more robust designs that incorporate groundwater manipulation coupled with in situ treatment. Several key innovations of the EnviroWall trademark system include the following: a method for guide box installation; a means for using interlocking seals at vertical seams; a down-hole video camera for inspecting seams and panels, installation of horizontal- and vertical-collection systems; installation of vertical monitoring wells and instrumentation on each side of the barrier; site-specific backfill design; and a pass-through system for funneling groundwater into a treatment system

  12. 10 CFR 5.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Remedial and affirmative action and self-evaluation. 5.110 Section 5.110 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION... action and self-evaluation. (a) Remedial action. If the designated agency official finds that a recipient...

  13. Remediation Approach for the Integrated Facility Disposition Project at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Kirk, P.G.; Stephens, Jr.J.M.

    2009-01-01

    The Integrated Facility Disposition Project (IFDP) is a multi-billion-dollar remediation effort being conducted by the U.S. Department of Energy (DOE) Office of Environmental Management in Oak Ridge, Tennessee. The scope of the IFDP encompasses remedial actions related to activities conducted over the past 65 years at the Oak Ridge National Laboratory (ORNL) and the Y-12 National Security Complex (Y-12). Environmental media and facilities became contaminated as a result of operations, leaks, spills, and past waste disposal practices. ORNL's mission includes energy, environmental, nuclear security, computational, and materials research and development. Remediation activities will be implemented at ORNL as part of IFDP scope to meet remedial action objectives established in existing and future decision documents. Remedial actions are necessary (1) to comply with environmental regulations to reduce human health and environmental risk and (2) to release strategic real estate needed for modernization initiatives at ORNL. The scope of remedial actions includes characterization, waste management, transportation and disposal, stream restoration, and final remediation of contaminated soils, sediments, and groundwater. Activities include removal of at or below-grade substructures such as slabs, underground utilities, underground piping, tanks, basins, pits, ducts, equipment housings, manholes, and concrete-poured structures associated with equipment housings and basement walls/floors/columns. Many interim remedial actions involving groundwater and surface water that have not been completed are included in the IFDP remedial action scope. The challenges presented by the remediation of Bethel Valley at ORNL are formidable. The proposed approach to remediation endeavors to use the best available technologies and technical approaches from EPA and other federal agencies and lessons learned from previous cleanup efforts. The objective is to minimize cost, maximize remedial

  14. Groundwater remediation of hexavalent chromium along the Columbia River at the Hanford site in Washington state, USA - 59030

    International Nuclear Information System (INIS)

    Foss, Dyan L.; Charboneau, Briant L.

    2012-01-01

    The U.S. Department of Energy Hanford Site, formerly used for nuclear weapons production, encompasses 1500 square kilometers in southeast Washington State along the Columbia River. A principle threat to the river are the groundwater plumes of hexavalent chromium (Cr(VI)), which affect approximately 9.8 square kilometers, and 4.1 kilometers of shoreline. Cleanup goals are to stop Cr(VI) from entering the river by the end of 2012 and remediate the groundwater plumes to the drinking water standards by the end of 2020. Five groundwater pump-and-treat systems are currently in operation for the remediation of Cr(VI). Since the 1990's, over 13.6 billion L of groundwater have been treated; over 1, 435 kg of Cr(VI) have been removed. This paper describes the unique aspects of the site, its environmental setting, hydrogeology, groundwater-river interface, riverine hydraulic effects, remediation activities completed to date, a summary of the current and proposed pump-and-treat operations, the in situ redox manipulation barrier, and the effectiveness of passive barriers, resins, and treatability testing results of calcium polysulfide, bio-stimulation, and electrocoagulation, currently under evaluation. (authors)

  15. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms

  16. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

  17. 29 CFR 36.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Remedial and affirmative action and self-evaluation. 36.110 Section 36.110 Labor Office of the Secretary of Labor NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a...

  18. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    International Nuclear Information System (INIS)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, and eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs

  19. Hanford Site Groundwater Monitoring for Fiscal Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

    2006-02-28

    This report is one of the major products and deliverables of the Groundwater Remediation and Closure Assessment Projects detailed work plan for FY 2006, and reflects the requirements of The Groundwater Performance Assessment Project Quality Assurance Plan (PNNL-15014). This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2005 on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes in groundwater are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. The largest portions of these plumes are migrating from the central Hanford Site to the southeast, toward the Columbia River. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the west-central part of the Hanford Site. Hexavalent chromium is present in plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath all but one of the reactor areas. Technetium-99 and uranium plumes exceeding standards are present in the 200 Areas. A uranium plume underlies the 300 Area. Minor contaminant plumes with concentrations greater than standards include carbon-14, cesium-137, cis-1,2-dichloroethene, cyanide, fluoride, plutonium, and trichloroethene. Monitoring for the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 is conducted in 11 groundwater operable units. The purpose of this monitoring is to define and track plumes and to monitor the effectiveness of interim remedial actions. Interim groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100-K, 100-D, and 100-H) and strontium-90 (100-N) reaching the Columbia River. The objective of two interim remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99/uranium plumes. Resource Conservation and

  20. Remedial design and remedial action guidance for the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1993-10-01

    The US Department of Energy, Idaho Operations Office (DOE-ID), the US Environmental Protection Agency, Region X (EPA), and the Idaho Department of Health and Welfare (IDHW) have developed this guidance on the remedial design and remedial action (RD/RA) process. This guidance is applicable to activities conducted under the Idaho National Engineering Laboratory (INEL) Federal Facility Agreement and Consent Order (FFA/CO) and Action Plan. The INEL FFA/CO and Action Plan provides the framework for performing environmental restoration according to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The guidance is intended for use by the DOE-ID, the EPA, and the IDHW Waste Area Group (WAG) managers and others involved in the planning and implementation of CERCLA environmental restoration activities. The scope of the guidance includes the RD/RA strategy for INEL environmental restoration projects and the approach to development and review of RD/RA documentation. Chapter 2 discusses the general process, roles and responsibilities, and other elements that define the RD/RA strategy. Chapters 3 through 7 describe the RD/RA documents identified in the FFA/CO and Action Plan. Chapter 8 provides examples of how this guidance can be applied to restoration projects. Appendices are included that provide excerpts from the FFA/CO pertinent to RD/RA (Appendix A), a applicable US Department of Energy (DOE) orders (Appendix B), and an EPA Engineering ''Data Gaps in Remedial Design'' (Appendix C)

  1. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.

  2. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    International Nuclear Information System (INIS)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations

  3. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  4. Overview of the remedial action priority system (RAPS)

    International Nuclear Information System (INIS)

    Whelan, G.; Steelman, B.L.; Strenge, D.L.; Droppo, J.G.

    1986-01-01

    To provide DOE with a better management tool for prioritizing funding allocations for further site investigations and possible remediations, Pacific Northwest Laboratory developed a more objective, physics-based risk assessment methodology called the Remedial Action Priority System (RAPS). This methodology uses empirically, analytically, and semianalytically based mathematical algorithms and a pathways analysis to predict the potential for contaminant transport from a hazardous waste disposal site to local populations. Four major pathways for contaminant migration are considered in the RAPS methodology: groundwater, overland, surface water, and atmospheric. Using the predications of contaminant transport, simplified exposure assessments are performed for important receptors. The risks associated with the sites can then be calculated relative to other sites for each pathway and for all pathways together. The RAPS methodology addresses many of the typical limitations associated with other ranking systems; it considers: (1) more site information and constituent characteristics associated with the transport pathways; (2) chemical and radioactive wastes; (3) the potential direction of contaminant movement; (4) contaminant retention (e.g., dispersion and decay/degradation), where applicable; (5) population distributions; (6) various routes of exposure (e.g., inhalations, ingestion, and external exposure); (7) contaminant toxicities; (8) duration of exposure of the surrounding population; and (9) contaminant arrival time to sensitive receptors. Because RAPS is based on more site information and constituent characteristics, the scoring system of the RAPS methodology also reduces the subjectivity associated with prioritizing hazardous waste sites. The RAPS methodology requires minimum user knowledge of risk assessment and a minimum amount of input data

  5. Geochemical and Isotopic Evaluation of Groundwater Movement in Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene

    2006-02-01

    This report describes the results of a comprehensive geochemical evaluation of the groundwater flow system in the Yucca Flat/Climax Mine Corrective Action Unit (CAU). The main objectives of this study are to identify probable pathways for groundwater flow within the study area and to develop constraints on groundwater transit times between selected data collection sites. This work provides an independent means of testing and verifying predictive flow models being developed for this CAU using finite element methods. The Yucca Flat/Climax Mine CAU constitutes the largest of six underground test areas on the Nevada Test Site (NTS) specified for remedial action in the ''Federal Facility Agreement and Consent Order''. A total of 747 underground nuclear detonations were conducted in this CAU. Approximately 23 percent of these detonations were conducted below or near the water table, resulting in groundwater contamination in the vicinity and possibly downgradient of these underground test locations. Therefore, a rigorous evaluation of the groundwater flow system in this CAU is necessary to assess potential long-term risks to the public water supply at downgradient locations.

  6. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1982-12-01

    Progress made during FY 1982, present status, and plans for FY 1983 are described for the following programs: radiological surveys and inclusion of vicinity properties; establishment of cooperative agreements; promulgation of standards for remedial action; acquisition of lands and materials; reprocessing of residual radioactive materials; National Environmental Policy Act (NEPA) documentation; program planning; technology development; remedial action; public participation; other federal agency activities; state and Indian tribe activities; and status of designated sites. Program funding is given

  7. Permeable reactive barrier - innovative technology for ground-water remediation

    International Nuclear Information System (INIS)

    Vidic, D.R.

    2002-01-01

    Significant advances in the application of permeable reactive barriers (PRBs) for ground-water remediation have been witnessed in the last 5 years. From only a few full-scale systems and pilot-scale demonstrations, there are currently at least 38 full-scale PRBs using zero-valent iron (ZVI) as a reactive material. Of those, 26 are continuous reactive walls, 9 are funnel-and- gate systems and 3 are in situ reactive vessels. Most of the PRB systems have used granular iron media and have been applied to address the control of contamination caused by chlorinated volatile organic compounds or heavy metals. Many regulatory agencies have expressed interest in PRB systems and are becoming more comfortable in issuing permits. The main advantage of PRB systems is that the installation costs are comparable with those of other ground-water remediation technologies, while the O and M costs are significantly lower and are mostly due to monitoring requirements, which are required for all remediation approaches. In addition, the land use can resume after the installation of the PRB systems, since there are few visible signs of the installation above grounds except for the monitoring wells. It is difficult to make any definite conclusions about the long-term performance of PRB systems because there is no more than 5 years of the record of performance that can be used for such analysis. The two main challenges still facing this technology are: (1) evaluating the longevity (geochemistry) of a PRB; and (2) ensuring/verifying hydraulic performance. A number of public/private partnerships have been established in recent years that are working together to resolve some of these problems. This organized approach by combining the efforts of several government agencies and private companies will likely result in better understanding and, hopefully, better acceptance of this technology in the future. (author)

  8. Department of Energy Hazardous Waste Remedial Actions Program

    International Nuclear Information System (INIS)

    Franco, P.J.

    1989-01-01

    This paper discusses the hazardous waste remedial actions program (HAZWRAP) which manages approximately 200 hazardous waste projects. These projects include preliminary assessments, site inspections, and remedial investigation/feasibility studies. The author describes the procedures HAZWRAP follows to ensure quality. The discussion covers the quality assurance aspects of project management, project planning, site characterization, document control and technical teamwork

  9. Radon remedial actions in schools of Friuli Venezia Giulia region (NE Italy)

    International Nuclear Information System (INIS)

    Giovani, C.; Cappelletto, C.; Garavaglia, M.; Pividore, S.; Villalta, R.

    2004-01-01

    In the last four years the Regional Agency of Environmental Protection (ARPA) of Friuli Venezia Giulia carried out a survey to determine the radon concentration in the schools of the area. During the survey all the 1320 schools and kindergartens of the region were investigated with more than 5000 measurements. In about 2% of cases, radon concentrations exceeded the reference levels of Italian law and remedial actions were performed. In collaboration with the Building Engineering Department of Udine University, ARPA FVG edited a manual concerning indications and proposals for building protection against radon. The environmental physics section of ARPA FVG, was heavily involved in the remedial action, both in the design of the action and in the investigation of effectiveness. In more than 20 schools the owners following ARPA indications solved the problem of high radon concentrations. In this paper the authors report the main type of applied remedial actions grouped taking into account the different remedial methodology. In Friuli Venezia Giulia region the main radon source is represented by soil. The contribution of building materials to high radon concentrations is negligible. The most common remedial actions consisted in natural or artificial depressurization of the soil or the crawlspace with respect to indoor building. Sometimes air was pumped into the building or air exchange number was increased. The authors show in detail the design of the performed investigations: these involved different measurement sets with passive electrets and active instruments for continuous data collection. Measurements usually last 3 contiguous weeks and are followed by long period measurements with solid track detectors. Optimization of remedial action performance was investigated when remedial action consisted in active air extraction from the soil under the buildings and fan time regulation was possible. Very often simple and cheap actions allowed a reduction of 90% in radon

  10. Program management strategies for following EPA guidance for remedial design/remedial action at DOE sites

    International Nuclear Information System (INIS)

    Hopper, J.P.; Chew, J.R.; Kowalski, T.E.

    1991-01-01

    At the US Department of Energy (DOE) facilities, environmental restoration is being conducted in accordance with Federal Facilities Compliance Agreements (or Interagency Agreements). These agreements establish a cooperative working relationship and often define roles, responsibilities and authorities for conduct and oversight of the Remedial Action Programs. The US Environmental Protection Agency (EPA) has guidelines on how to initiate and perform remedial actions for sites they are remediating under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) as amended by the Superfund Amendments and Re-Authorization Act (SARA). This paper addresses some of the difference and commonalities between the DOE project management procedures and EPA guidance documents. This report covers only the RD/RA phase of environmental restoration. On the surface, there are many apparent differences between the DOE and EPA project management processes. Upon closer review, however, many of the differences are the result of applying different terminology to the same phase of a project. By looking for the similarities in the two processes rather than hunting for differences, many communication problems are avoided. Understanding both processes also aids in figuring out when, how and to what extent EPA should participate in the RD/RA phase for DOE lead cleanup activities. The DOE Remedial Design and Remedial Action process is discussed in a stepwise manner and compared to the EPA process. Each element of the process is defined. Activities common to both the EPA and DOE are correlated. The annual DOE budget cycle for remediation projects and the four-year cycle for appropriation of remediation funds are discussed, and the constraints of this process examined. DOE orders as well as other requirements for RD/RA activities are summarized and correlated to EPA regulations where this is possible

  11. Guidelines for active spreading during in situ chemical oxidation to remediate contaminated groundwater

    Science.gov (United States)

    The effectiveness of in situ chemical oxidation to remediate contaminated aquifers depends on the extent and duration of contact between the injected treatment chemical and the groundwater contaminant (the reactants). Techniques that inject and extract in the aquifer to ‘ac...

  12. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    International Nuclear Information System (INIS)

    1997-01-01

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project

  13. Phase 1 remediation of jet fuel contaminated soil and groundwater at JFK International Airport using dual phase extraction and bioventing

    International Nuclear Information System (INIS)

    Roth, R.; Bianco, P. Rizzo, M.

    1995-01-01

    Soil and groundwater contaminated with jet fuel at Terminal One of the JFK International Airport in New York have been remediated using dual phase extraction (DPE) and bioventing. Two areas were remediated using 51 DPE wells and 20 air sparging/air injection wells. The total area remediated by the DPE wells is estimated to be 4.8 acres. Groundwater was extracted to recover nonaqueous phase and aqueous phase jet fuel from the shallow aquifer and treated above ground by the following processes; oil/water separation, iron-oxidation, flocculation, sedimentation, filtration, air stripping and liquid-phase granular activated carbon (LPGAC) adsorption. The extracted vapors were treated by vapor-phase granular activated carbon (VPGAC) adsorption in one area, and catalytic oxidation and VPGAC adsorption in another area. After 6 months of remediation, approximately 5,490 lbs. of volatile organic compounds (VOCs) were removed by soil vapor extraction (SVE), 109,650 lbs. of petroleum hydrocarbons were removed from the extracted groundwater, and 60,550 lbs. of petroleum hydrocarbons were biologically oxidized by subsurface microorganisms. Of these three mechanisms, the rate of petroleum hydrocarbon removal was the highest for biological oxidation in one area and by groundwater extraction in another area

  14. Alcan Kitimat smelter modernization project remedial action scheme functional requirements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-09-09

    This paper identified remedial actions for reducing islanding and voltage collapse at the Alcan Kitimat smelter modernization project. The study was conducted after an earlier study indicated that the proposed project significantly increased electricity loads and stresses on Alcan's power system. Remedial actions included shedding the appropriate number of Kemano (KMO) generators; reducing Kitimat potline loads by de-saturating saturable reactors and lowering tap changers; and shedding potlines to preserve the Kitimat auxiliary load and facilitate power restoration. Power flow and transient stability studies were conducted to evaluate the impact of the remedial actions on the KMO generators and the transmission system. Results showed that fast load reduction improved power system response. Load reduction by changing the converter transformer tap reduced significant amounts of loads, but was too slow to be effective during fast voltage collapse. The study showed that although the remedial action scheme (RAS) reduced the impact of various contingencies on the Alcan system, performance was degraded due to the significant load increase. Fast load shedding capability was also reduced. It was concluded that further research is needed to develop and implement the RAS. 3 tabs., 7 figs.

  15. Consensus implementation of a groundwater remediation project at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Hastings, K.R.; Carlson, D.S.

    1996-01-01

    Because of significant characterization uncertainties existing when the Record of Decision was signed and the unfavorable national reputation of groundwater pump and treat remediation projects, the Test Area North (TAN) groundwater ROD includes the evaluation of five emerging technologies that show potential for treating the organic contamination in situ or reducing the toxicity of contaminants above ground. Treatability studies will be conducted to ascertain whether any may be suitable for implementation at TAN to yield more timely or cost effective restoration of the aquifer. The implementation approach established for the TAN groundwater project is a consensus approach, maximizing a partnership relation with stakeholders in constant, iterative implementation decision making

  16. Remedial actions at the former Union Carbide Corporation uranium mill sites, Rifle, Garfield County, Colorado

    International Nuclear Information System (INIS)

    1990-03-01

    This appendix provides the information needed to understand the conceptual designs for the remedial action alternatives addressed in this environmental impact statement (EIS). It is intended to provide sufficient details for the reader to evaluate the feasibility and assess the impacts of each remedial action alternative. It is not intended to provide the detailed engineering necessary to implement the alternatives. Details of the preferred remedial action will be presented in the remedial action plan (RAP). The remedial action alternatives addressed in this EIS include no action, stabilization at the New Rifle site, disposal at the Estes Gulch site, and disposal at the Lucas Mesa site. All alternatives include interim actions to remediate existing health and safety hazards to the Rifle community that presently exist at the Old and New Rifle processing sites. It should be noted that the borrow sites included in this EIS were selected as the sources of the necessary borrow materials for impacts analyses purposes only. The borrow sites to be used for the remedial action will be selected during the final design. 21 figs., 18 tabs

  17. Human health and other risk drivers to prioritize site remediation

    Energy Technology Data Exchange (ETDEWEB)

    McHugh, T.; Connor, J. [Groundwater Services Inc, Houston, TX (United States)

    2003-07-01

    Remedial actions at soil and groundwater cleanup sites have traditionally been addressed on an individual, case-by-case basis, as needed to address regulatory requirements. However, effective management of large portfolios of remediation sites (such as hundreds or thousands of underground storage tank sites owned by a single company) requires coordination and prioritisation of individual site response actions to optimise the degree of risk reduction achieved with available resources. To meet these management objectives, two new risk-based management tools have been developed and implemented by the authors: i) a simple risk-based classification system, that can be employed to prioritise response actions, identify key risk drivers, and measure risk reduction progress over time for the full site portfolio; and ii) a lifecycle cost management system that can be employed to forecast remediation spending and optimise risk reduction benefits. For use in prioritising response actions at remediation sites, 'risk' is defined as the negative consequence of no action. (orig.)

  18. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 4, Water resources protection strategy

    International Nuclear Information System (INIS)

    1991-12-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protection strategy for the Bodo Canyon disposal site are presented in this document

  19. Use of a permeable biological reaction barrier for groundwater remediation at a uranium mill tailings remedial action (UMTRA) site

    International Nuclear Information System (INIS)

    Thombre, M.S.; Thomson, B.M.; Barton, L.L.

    1997-01-01

    Previous work at the University of New Mexico and elsewhere has shown that sulfate reducing bacteria are capable of reducing uranium from the soluble +6 oxidation state to the insoluble +4 oxidation state. This chemistry forms the basis of a proposed groundwater remediation strategy in which microbial reduction would be used to immobilize soluble uranium. One such system would consist of a subsurface permeable barrier which would stimulate microbial growth resulting in the reduction of sulfate and nitrate and immobilization of metals while permitting the unhindered flow of ground water through it. This research investigated some of the engineering considerations associated with a microbial reducing barrier such as identifying an appropriate biological substrate, estimating the rate of substrate utilization, and identifying the final fate of the contaminants concentrated in the barrier matrix. The performance of batch reactors and column systems that treated simulated plume water was evaluated using cellulose, wheat straw, alfalfa hay, sawdust, and soluble starch as substrates. The concentrations of sulfate, nitrate, and U(VI) were monitored over time. Precipitates from each system were collected and the precipitated U(IV) was determined to be crystalline UO 2 (s) by X-ray Diffraction. The results of this study support the proposed use of cellulosic substrates as candidate barrier materials

  20. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  1. Sustainable in-well vapor stripping: A design, analytical model, and pilot study for groundwater remediation

    Science.gov (United States)

    Sutton, Patrick T.; Ginn, Timothy R.

    2014-12-01

    A sustainable in-well vapor stripping system is designed as a cost-effective alternative for remediation of shallow chlorinated solvent groundwater plumes. A solar-powered air compressor is used to inject air bubbles into a monitoring well to strip volatile organic compounds from a liquid to vapor phase while simultaneously inducing groundwater circulation around the well screen. An analytical model of the remediation process is developed to estimate contaminant mass flow and removal rates. The model was calibrated based on a one-day pilot study conducted in an existing monitoring well at a former dry cleaning site. According to the model, induced groundwater circulation at the study site increased the contaminant mass flow rate into the well by approximately two orders of magnitude relative to ambient conditions. Modeled estimates for 5 h of pulsed air injection per day at the pilot study site indicated that the average effluent concentrations of dissolved tetrachloroethylene and trichloroethylene can be reduced by over 90% relative to the ambient concentrations. The results indicate that the system could be used cost-effectively as either a single- or multi-well point technology to substantially reduce the mass of dissolved chlorinated solvents in groundwater.

  2. Status of remedial investigation activities in the Hanford Site 300 Area groundwater operable unit

    International Nuclear Information System (INIS)

    Hulstrom, L.C.; Innis, B.E.; Frank, M.A.

    1993-09-01

    The Phase 1 remedial investigation (RI) and Phase 1 and 2 feasibility studies (FS) for the 300-FF-5 groundwater operable unit underlying the 300 Area on the Hanford Site have been completed. Analysis and evaluation of soil, sediment, and surface water, and biotic sampling data, groundwater chemistry, and radiological data gathered over the past 3 years has been completed. Risk assessment calculations have been performed. Use of the data gathered, coupled with information from an automated water level data collection system, has enabled engineers to track three plumes that represent the most significant contamination of the groundwater

  3. Geotechnical engineering considerations in the NRC's review of uranium mill tailings remedial action plans

    International Nuclear Information System (INIS)

    Gillen, D.M.

    1985-01-01

    To reduce potential health hazards associated with inactive uranium mill tailings sites, the Department of Energy (DOE) is presently investigating and implementing remedial actions at 24 sites in the Uranium Mill Tailings Remedial Action Program (UMTRAP). All remedial actions must be selected and performed with the concurrence of the Nuclear Regulatory Commission (NRC). This paper provides a discussion of geotechnical engineering considerations during the NRC's preconcurrence review of proposed remedial action plans. In order for the NRC staff to perform an adequate geotechnical engineering review, DOE documents must contain a presentation of the properties and stability of all in-situ and engineered soil and rock which may affect the ability of the remedial action plans to meet EPA standards for long-term stability and control. Site investigations, laboratory testing, and remedial action designs must be adequate in scope and technique to provide sufficient data for the NRC staff to independently evaluate static and dynamic stability, settlement, radon attenuation through the soil cover, durability of rock for erosion protection, and other geotechnical engineering factors

  4. Description of the Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed

  5. Description of the Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

  6. Coordinating bifurcated remediation of soil and groundwater at sites containing multiple operable units

    International Nuclear Information System (INIS)

    Laney, D.F.

    1996-01-01

    On larger and/or more complex sites, remediation of soil and groundwater is sometimes bifurcated. This presents some unique advantages with respect to expedited cleanup of one medium, however, it requires skillful planning and significant forethought to ensure that initial remediation efforts do not preclude some long-term options, and/or unduly influence the subsequent selection of a technology for the other operable units and/or media. this paper examines how the decision to bifurcate should be approached, the various methods of bifurcation, the advantages and disadvantages of bifurcation, and the best methods to build flexibility into the design of initial remediation systems so as to allow for consideration of a fuller range of options for remediation of other operable units and/or media at a later time. Pollutants of concern include: metals; petroleum hydrocarbons; and chlorinated solvents

  7. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  8. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    International Nuclear Information System (INIS)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE's overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program

  9. A stochastic optimization model under modeling uncertainty and parameter certainty for groundwater remediation design-Part I. Model development

    Energy Technology Data Exchange (ETDEWEB)

    He, L., E-mail: li.he@ryerson.ca [Department of Civil Engineering, Faculty of Engineering, Architecture and Science, Ryerson University, 350 Victoria Street, Toronto, Ontario, M5B 2K3 (Canada); Huang, G.H. [Environmental Systems Engineering Program, Faculty of Engineering, University of Regina, Regina, Saskatchewan, S4S 0A2 (Canada); College of Urban Environmental Sciences, Peking University, Beijing 100871 (China); Lu, H.W. [Environmental Systems Engineering Program, Faculty of Engineering, University of Regina, Regina, Saskatchewan, S4S 0A2 (Canada)

    2010-04-15

    Solving groundwater remediation optimization problems based on proxy simulators can usually yield optimal solutions differing from the 'true' ones of the problem. This study presents a new stochastic optimization model under modeling uncertainty and parameter certainty (SOMUM) and the associated solution method for simultaneously addressing modeling uncertainty associated with simulator residuals and optimizing groundwater remediation processes. This is a new attempt different from the previous modeling efforts. The previous ones focused on addressing uncertainty in physical parameters (i.e. soil porosity) while this one aims to deal with uncertainty in mathematical simulator (arising from model residuals). Compared to the existing modeling approaches (i.e. only parameter uncertainty is considered), the model has the advantages of providing mean-variance analysis for contaminant concentrations, mitigating the effects of modeling uncertainties on optimal remediation strategies, offering confidence level of optimal remediation strategies to system designers, and reducing computational cost in optimization processes.

  10. Remedial action at the Acid/Pueblo Canyon site, Los Alamos, New Mexico. Final report

    International Nuclear Information System (INIS)

    1984-10-01

    The Acid/Pueblo Canyon site (TA-45) was designated in 1976 for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). During the period 1943 to 1964 untreated and treated liquid wastes generated by nuclear weapons research activities at the Los Alamos Scientific Laboratory (LASL) were discharged into the two canyons. A survey of the site conducted by LASL in 1976 to 1977 identified two areas where radiological contamination exceeded criteria levels. The selected remedial action was based on extensive radiological characterization and comprehensive engineering assessments and comprised the excavation and disposal of 390 yd 3 of contaminated soil and rock. This document describes the background to the remedial action, the parties involved in administering and executing it, the chronology of the work, verification of the adequacy of the remedial action, and the cost incurred. 14 references, 5 figures, 5 tables

  11. Baseline risk assessment for groundwater contamination at the uranium mill tailings site near Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1993-09-01

    This baseline risk assessment evaluates potential impact to public health or the environment resulting from groundwater contamination at the former uranium mill processing site near Monument Valley, Arizona. The tailings and other contaminated material at this site are being relocated and stabilized in a disposal cell at Mexican Hat, Utah, through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The tailings removal is planned for completion by spring 1994. After the tailings are removed, groundwater contamination at the site will continue to be evaluated. This risk assessment is the first document specific to this site for the Groundwater Project. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site

  12. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho

    International Nuclear Information System (INIS)

    Matthews, M.L.; Nagel, J.

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho

  13. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  14. 36 CFR 905.735-108 - Remedial and disciplinary action.

    Science.gov (United States)

    2010-07-01

    ... DEVELOPMENT CORPORATION STANDARDS OF CONDUCT General Provisions § 905.735-108 Remedial and disciplinary action... assignment; (3) Changes in the assigned duties of the individual; or (4) Disciplinary action. (b) Where the situation warrants some form of disciplinary action, the Chairman may choose from a wide range including a...

  15. Remedial action technology - arid

    International Nuclear Information System (INIS)

    Hakonson, T.E.; DePoorter, G.L.; Nyhan, J.W.; Perkins, B.A.; Lane, L.J.

    1982-01-01

    A summary is presented of the low-level waste remedial action program at Los Alamos. The experimental design and progress is described for the experiments on second generation intrusion barriers, subsidence effects on SLB components, moisture cycling effects on chemical transport, and erosion control methodologies. The soil moisture data from the bio-intrusion and moisture cycling experiments both demonstrate the overwhelming importance of vegetation in minimizing infiltration of water through trench covers and backfill. Evaporation, as a water loss component in trench covers, is only effective in reducing soil moisture within 40 cm of the trench cover surface. Moisture infiltrating past the zone of evaporation in unvegetated or poorly vegetated trench covers is in storage and accumulates until drainage out of the soil profile occurs. Judicious selection of vegetation species for revegetating a low-level waste site may prevent infiltration of moisture into the trench and, when coupled with other design features (i.e. trench cover slope, tilling and seeding practice), may greatly reduce problems with erosion. Standard US Department of Agriculture erosion plots, when coupled with a state-of-the-art water balance and erosion model (CREAMS) promises to be highly useful in screening proposed remedial action cover designs for low-level waste sites. The erosion plot configuration allows for complete accounting of the water balance in a soil profile. This feature enables the user to optimize cover designs to minimize erosion and infiltration of water into the trench

  16. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 4

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Faust, R.A.

    1983-09-01

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation

  17. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Faust, R.A.

    1983-09-01

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation.

  18. The use of in-situ dual vacuum extraction for remediation of soil and groundwater

    International Nuclear Information System (INIS)

    Trowbridge, B.E.; Ott, D.E.

    1992-01-01

    Dual Extraction provides a rapid and cost-effective method of remediating soil and groundwater impacted by volatile organic compounds (VOC's). Dual Extraction is the removal of both water and vapors through the same borehole using entrainment. This technology provides for the remediation of the vadose zone, capillary fringe, smear zone, and existing water table. The effectiveness of this technology is shown in a case study. A release from an Underground Storage Tank (UST) was responsible for a hydrocarbon plume spreading over approximately 50,000 square feet. The release produced vadose zone contamination in the silty and sandy clays from 10 - 30 feet below ground surface with TPH concentrations up to 1,400 mg/kg. A layer of free floating liquid hydrocarbon was present on a shallow aquifer located at 30 feet bgs in thicknesses ranging from 0.5 feet to 3.0 feet. An in-situ dual-extraction system was installed to remediate the soils and groundwater to levels as required by the Los Angeles Regional Water Quality Control Board (RWQCB). The system operated 24 hours/day for 196 days with an operating efficiency of over 99%. After 196 days, over 17,000 pounds of hydrocarbons had been extracted from the soils. Seven confirmatory soil borings were advanced in the area of highest initial hydrocarbon concentrations and indicated that TPH and BTEX concentrations had decreased over 99% from initial soil concentrations. Three confirmatory groundwater samples were obtained from monitoring wells initially exhibiting up to 3 feet of floating product. Confirmatory samples exhibited non-detectable (ND) concentrations of TPH and BTEX. Based upon the positive confirmatory results, site closure was obtained from the RWQCB in May of 1991. In only 28 weeks of operation, the groundwater contamination was reduced from free floating product to non-detectable concentrations of TPH using Dual Vacuum Extraction

  19. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

  20. Hazardous Waste Remedial Actions Program: integrating waste management

    International Nuclear Information System (INIS)

    Petty, J.L.; Sharples, F.E.

    1986-01-01

    The Hazardous Waste Remedial Actions Program was established to integrate Defense Programs' activities in hazardous and mixed waste management. The Program currently provides centralized planning and technical support to the Office of the Assistant Secretary for Defense Programs. More direct project management responsibilities may be assumed in the future. The Program, under the direction of the ASDP's Office of Defense Waste and Transportation Management, interacts with numerous organizational entities of the Department. The Oak Ridge Operations Office has been designated as the Lead Field Office. The Program's four current components cover remedial action project identification and prioritization; technology adaptation; an informative system; and a strategy study for long-term, ''corporate'' project and facility planning

  1. Review of standards and guidelines pertinent to DOE's remedial action programs

    International Nuclear Information System (INIS)

    Soldat, J.K.; Denham, D.H.

    1984-10-01

    A number of radiological standards, guidelines, and dose criteria have been promulgated that may be relevant to the Department of Energy's (DOE) Remedial Action programs. Some of these will be applied to remedial actions undertaken by DOE to ensure that health and safety aspects will be adequately addressed. Pacific Northwest Laboratory staff are reviewing and evaluating existing and proposed environmental radiological standards and criteria for their applicability. National and international environmental standards and criteria, and studies conducted by other DOE contractors are being evaluated. The aim of the review is to identify gaps in these standards and guidelines and to recommend further development as necessary. This paper provides a summary of the standards and guidelines evaluated for applicability to DOE's Remedial Action programs. 33 references, 5 tables

  2. Baseline risk assessment for groundwater contamination at the uranium mill tailings site near Monument Valley, Arizona. Draft

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This baseline risk assessment evaluates potential impact to public health or the environment resulting from groundwater contamination at the former uranium mill processing site near Monument Valley, Arizona. The tailings and other contaminated material at this site are being relocated and stabilized in a disposal cell at Mexican Hat, Utah, through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The tailings removal is planned for completion by spring 1994. After the tailings are removed, groundwater contamination at the site will continue to be evaluated. This risk assessment is the first document specific to this site for the Groundwater Project. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site.

  3. A stochastic optimization model under modeling uncertainty and parameter certainty for groundwater remediation design--part I. Model development.

    Science.gov (United States)

    He, L; Huang, G H; Lu, H W

    2010-04-15

    Solving groundwater remediation optimization problems based on proxy simulators can usually yield optimal solutions differing from the "true" ones of the problem. This study presents a new stochastic optimization model under modeling uncertainty and parameter certainty (SOMUM) and the associated solution method for simultaneously addressing modeling uncertainty associated with simulator residuals and optimizing groundwater remediation processes. This is a new attempt different from the previous modeling efforts. The previous ones focused on addressing uncertainty in physical parameters (i.e. soil porosity) while this one aims to deal with uncertainty in mathematical simulator (arising from model residuals). Compared to the existing modeling approaches (i.e. only parameter uncertainty is considered), the model has the advantages of providing mean-variance analysis for contaminant concentrations, mitigating the effects of modeling uncertainties on optimal remediation strategies, offering confidence level of optimal remediation strategies to system designers, and reducing computational cost in optimization processes. 2009 Elsevier B.V. All rights reserved.

  4. Department of Energy remedial action program annual conference: Proceedings

    International Nuclear Information System (INIS)

    1990-01-01

    The Office of Environmental Restoration manages a number of programs whose purposes are to complete remedial action at Department of Energy (DOE) facilities and sites located throughout the United States. This volume contains 18 papers on the topics environmental restoration and hazardous/mixed waste characterization and remediation. Individual papers are indexed separately on the Energy Database

  5. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  6. Mechanisms of uranium interactions with hydroxyapatite: Implications for groundwater remediation

    Science.gov (United States)

    Fuller, C.C.; Bargar, J.R.; Davis, J.A.; Piana, M.J.

    2002-01-01

    The speciation of U(VI) sorbed to synthetic hydroxyapatite was investigated using a combination of U LIII-edge XAS, synchrotron XRD, batch uptake measurements, and SEM-EDS. The mechanisms of U(VI) removal by apatite were determined in order to evaluate the feasibility of apatitebased in-situ permeable reactive barriers (PRBs). In batch U(VI) uptake experiments with synthetic hydroxyapatite (HA), near complete removal of dissolved uranium (>99.5%) to use in development of PRBs for groundwater U(VI) remediation.

  7. REMEDIATION OF NITRATE-CONTAMINATED GROUNDWATER USING A BIOBARRIER

    International Nuclear Information System (INIS)

    STrietelmeir, B.

    2000-01-01

    A biobarrier system has been developed for use in remediating shallow alluvial groundwater. This barrier is made from highly porous materials that are relatively long-lasting, carbon-based (to supply a limiting nutrient in nitrate destruction, in most cases), and extremely inexpensive and easy to emplace. In a series of laboratory studies, we have determined the effectiveness of this barrier at destroying nitrate and perchlorate in groundwater from Mortandad Canyon at Los Alamos National Laboratory (LANL). This groundwater was obtained from a monitoring well, MCO-5, which is located in the flowpath of the discharge waters from the LANL Radioactive Liquid Waste Treatment Facility (RLWTF). Water with elevated nitrate levels has been discharged from this plant for many years, until recently when the nitrate levels have been brought under the discharge limits. However, the historical discharge has resulted in a nitrate plume in the alluvial groundwater in this canyon. The LANL Multi-Barrier project was initiated this past year to develop a system of barriers that would prevent the transport of radionuclides, metals, colloids and other contaminants, including nitrate and perchlorate, further down the canyon in order to protect populations down-gradient. The biobarrier. will be part of this Multi-Barrier system. We have demonstrated the destruction of nitrate at levels up to 6.5-9.7 mhl nitrate (400-600 mg/L), and that of perchlorate at levels of about 4.3 microM perchlorate (350 ppb). We have quantified the populations of microorganisms present in the biofilm that develops on the biobarrier. The results of this research will be discussed along with other potential applications of this system

  8. INDEPENDENT REVIEW OF THE X-701B GROUNDWATER REMEDY, PORTSMOUTH, OHIO: TECHNICAL EVALUATION AND RECOMMENDATIONS

    Energy Technology Data Exchange (ETDEWEB)

    Looney, B.; Eddy-Dilek, C.; Costanza, J.; Rossabi, J.; Early, T.; Skubal, K.; Magnuson, C.

    2008-12-15

    The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issued by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are

  9. Review of standards and guidelines pertinent to DOE's Remedial Action programs

    International Nuclear Information System (INIS)

    Soldat, J.K.; Denham, D.H.

    1985-01-01

    A number of radiological standards, guidelines, and dose criteria have been promulgated that may be relevant to the Department of Energy's (DOE) Remedial Action programs. Some of these are being applied to remedial actions undertaken by DOE to ensure that health and safety aspects are adequately addressed. Pacific Northwest Laboratory staff reviewed existing and proposed environmental radiological standards and criteria for their applicability to DOE's Remedial Action Programs. National and international environmental standards and criteria, and studies conducted by other DOE contractors were reviewed. The review indicated that there is a lack of uniformity between the dose guidelines developed by the various agencies. A uniform dose standard is needed for DandD, at least as an upper limit with application of the ALARA philosophy. 33 references, 5 tables

  10. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  11. Redmedial Action Plan for the Risk-Based Remediation of Site ST14 (SWMU 68), LPSTID 104819; the Former Base Refueling Area (A0C7); the French Underdrain System (SWMU 64); and the North Oil/Water Separator (SWMU 67), Carswell Air Force Base, Naval Air Station Fort Worth Joint Reserve Base, Texas. Volume 1: Report

    National Research Council Canada - National Science Library

    1997-01-01

    ...) to prepare a remedial action plan (RAP) in support of a risk-based remediation decision for soil and groundwater contaminated with fuel hydrocarbons at Site ST14 at Carswell Air Force Base (AFB), Texas...

  12. Groundwater Radioiodine: Prevalence, Biogeochemistry, And Potential Remedial Approaches

    International Nuclear Information System (INIS)

    Denham, M.; Kaplan, D.; Yeager, C.

    2009-01-01

    ) compile the background information necessary to understand behavior of 129 I in the environment, (2) discuss sustainable remediation approaches to 129 I contaminated groundwater, and (3) identify areas of research that will facilitate remediation of 129 I contaminated areas on DOE sites. Lines of scientific inquiry that would significantly advance the goals of basic and applied research programs for accelerating 129 I environmental remediation and reducing uncertainty associated with disposal of 129 I waste are: (1) Evaluation of amendments or other treatment systems that can sequester subsurface groundwater 129 I. (2) Develop analytical techniques for measurement of total 129 I that eliminate the necessity of collecting and shipping large samples of groundwater. (3) Develop and evaluate ways to manipulate areas with organic-rich soil, such as wetlands, to maximize 129 I sorption, minimizing releases during anoxic conditions. (4) Develop analytical techniques that can identify the various 129 I species in the subsurface aqueous and solid phases at ambient concentrations and under ambient conditions. (5) Identify the mechanisms and factors controlling iodine-natural organic matter interactions at appropriate environmental concentrations. (6) Understand the biological processes that transform iodine species throughout different compartments of subsurface waste sites and the role that these processes have on 129 I flux

  13. GROUNDWATER RADIOIODINE: PREVALENCE, BIOGEOCHEMISTRY, AND POTENTIAL REMEDIAL APPROACHES

    Energy Technology Data Exchange (ETDEWEB)

    Denham, M.; Kaplan, D.; Yeager, C.

    2009-09-23

    former Yucca Mountain disposal facilities. The objectives of this report are to: (1) compile the background information necessary to understand behavior of {sup 129}I in the environment, (2) discuss sustainable remediation approaches to {sup 129}I contaminated groundwater, and (3) identify areas of research that will facilitate remediation of {sup 129}I contaminated areas on DOE sites. Lines of scientific inquiry that would significantly advance the goals of basic and applied research programs for accelerating {sup 129}I environmental remediation and reducing uncertainty associated with disposal of {sup 129}I waste are: (1) Evaluation of amendments or other treatment systems that can sequester subsurface groundwater {sup 129}I. (2) Develop analytical techniques for measurement of total {sup 129}I that eliminate the necessity of collecting and shipping large samples of groundwater. (3) Develop and evaluate ways to manipulate areas with organic-rich soil, such as wetlands, to maximize {sup 129}I sorption, minimizing releases during anoxic conditions. (4) Develop analytical techniques that can identify the various {sup 129}I species in the subsurface aqueous and solid phases at ambient concentrations and under ambient conditions. (5) Identify the mechanisms and factors controlling iodine-natural organic matter interactions at appropriate environmental concentrations. (6) Understand the biological processes that transform iodine species throughout different compartments of subsurface waste sites and the role that these processes have on {sup 129}I flux.

  14. Formerly utilized MED/AEC sites remedial action program post-remedial-action radiological survey of Kent Chemical Laboratory, the University of Chicago, Chicago, IL

    International Nuclear Information System (INIS)

    Wynveen, R.A.; Smith, W.H.; Sholeen, C.M.; Justus, A.L.; Flynn, K.F.

    1983-05-01

    A comprehensive radiological assessment of Kent Laboratory was conducted during September 1977, by the ANL Radiological Survey Group to determine if any radioactive contamination remained. The results of the assessment indicated the need for remedial action. Since 1977, the University has decontaminated this laboratory building, and in May 1983, the Department of Energy requested the ANL Radiological Survey Group to conduct a post-remedial-action survey. All the contaminated areas identified during the 1977 assessment were rechecked. Contamination remained in six of the rooms. Further decontamination of these areas was conducted by university personnel, and as a result, these areas are now free of contamination. However, a contaminated clay pipe in the attic remained. The clay pipe has since been removed and disposed of as solid radioactive waste. During the post-remedial-action survey, six soil samples were collected from excavation trenches dug in Rooms 1 and 2 as part of the University's remedial action efforts. Also, four sludge samples were taken from below the manhole covers in the basement of Kent Chemical Laboratory to assess the radiological condition of the sewer system. A radiological assessment of the sewer system had not been accomplished during the 1977 survey as per program direction. Radiochemical (fluorometric) and gamma-spectral analyses indicated that eight out of ten soil and sludge samples contained levels of radioactivity above expected background concentrations. The soil has since been further excavated. The building is now free of radioactive contamination in excess of background levels; however, the sewers do contain radioactive materials above background levels since contamination was found at appropriate access points. 6 references, 16 figures, 7 tables

  15. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1993-06-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VP) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the groundwater from further degradation. Remedial actions at the Slick Rock sites must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC)

  16. [Study on the groundwater petroleum contaminant remediation by air sparging].

    Science.gov (United States)

    Wang, Zhi-Qiang; Wu, Qiang; Zou, Zu-Guang; Chen, Hong; Yang, Xun-Chang; Zhao, Ji-Chu

    2007-04-01

    The groundwater petroleum contaminant remediation effect by air sparging was investigated in an oil field. The results show that the soil geological situation has great influence on the air distribution, and the shape of air distribution is not symmetrical to the air sparging (AS) well as axis. The influence distance in the left of AS well is 6 m, and only 4 m in the right. The petroleum removal rate can reach 70% in the zone with higher air saturation, but only 40% in the zone with lower air saturation, and the average petroleum removal rate reaches 60% in the influence zone for 40 days continuous air sparging. The petroleum components in groundwater were analyzed by GC/MS (gas chromatogram-mass spectrograph) before and after experiments, respectively. The results show that the petroleum removal rate has relationship with the components and their properties. The petroleum components with higher volatility are easily removed by volatilization, but those with lower volatility are difficult to remove, so a tailing effect of lingering residual contaminant exists when the air sparging technology is adopted to treat groundwater contaminated by petroleum products.

  17. Record of Decision Tank Farm Soil and INTEC Groundwater

    Energy Technology Data Exchange (ETDEWEB)

    L. S. Cahn

    2007-05-01

    This decision document presents the selected remedy for Operable Unit (OU) 3-14 tank farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center (INTEC), which is located on the Idaho National Laboratory (INL) Site. The tank farm was initially evaluated in the OU 3-13 Record of Decision (ROD), and it was determined that additional information was needed to make a final decision. Additional information has been obtained on the nature and extent of contamination in the tank farm and on the impact of groundwater. The selected remedy was chosen in accordance with the Comprehensive Environmental Response, Liability and Compensation Act of 1980 (CERCLA) (42 USC 9601 et seq.), as amended by the Superfund Amendments and Reauthorization Act of 1986 (Public Law 99-499) and the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR 300). The selected remedy is intended to be the final action for tank far soil and groundwater at INTEC.

  18. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  19. UMTRA -- The US Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Lightner, R.; Cormier, C.; Bierley, D.

    1995-01-01

    In the late 1970s, the United States (US) established the first comprehensive regulatory structure for the management, disposal, and long-term care of wastes produced from its domestic uranium processing industry. This regulatory framework was established through the passage of the Uranium Mill Tailings Radiation Control Act of 1978, often referred to as UMTRCA. This legislation created the Uranium Mill Tailings Remedial Action (UMTRA) Project and assigned the US Department of Energy (DOE) the lead in conducting the required remedial action at 24 designated inactive uranium ore processing sites. With the majority of these 22 sites complete, the DOE's UMTRA Project has established a distinguished reputation for safely and effectively remediating these low-level waste sites in a complex regulatory and socioeconomic environment. This paper describes the past accomplishments and current status of the UMTRA Project and discusses the DOE's plans for addressing ground water contamination associated with these sites and its commitment to continuing the long-term care and management of these disposal cells

  20. 16 CFR 1115.21 - Compulsory remedial actions.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Compulsory remedial actions. 1115.21 Section 1115.21 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS... Proceedings (16 CFR part 1025). (b) Injunctive relief. The Commission may apply to a U.S. district court in...

  1. Annual status report on the inactive uranium mill tailings sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-01

    Assessments of inactive uranium mill tailings sites in the United States led to the designation of 25 processing sites for remedial action under the provisions of Section 102(a) Public Law 95-604. The Department of Energy assessed the potential health effects to the public from the residual radioactive materials on or near the 25 sites; and, with the advice of the Environmental Protection Agency, the Secretary established priorities for performing remedial action. In designating the 25 sites and establishing the priorities for performing remedial action, the Department of Energy consulted with the Environmental Protection Agency, Nuclear Regulatory Commission, Department of the Interior, governors of the affected States, Navajo Nation, and appropriate property owners. Public participation in this process was encouraged. During Fiscal Year 1980, Department of Energy will be conducting surveys to verify the radiological characterization at the designated processing sites; developing cooperative agreements with the affected States; and initiating the appropriate National Environmental Policy Act documentation prior to conducting specific remedial actions.

  2. Application of Fe-Cu/Biochar System for Chlorobenzene Remediation of Groundwater in Inhomogeneous Aquifers

    Directory of Open Access Journals (Sweden)

    Xu Zhang

    2017-12-01

    Full Text Available Chlorobenzene (CB, as a typical Volatile Organic Contaminants (VOC, is toxic, highly persistent and easily migrates in water, posing a significant risk to human health and subsurface ecosystems. Therefore, exploring effective approaches to remediate groundwater contaminated by CB is essential. As an enhanced micro-electrolysis system for CB-contaminated groundwater remediation, this study attempted to couple the iron-copper bimetal with biochar. Two series of columns using sands with different grain diameters were used, consisting of iron, copper and biochar fillings as the permeable reactive barriers (PRBs, to simulate the remediation of CB-contaminated groundwater in homogeneous and heterogeneous aquifers. Regardless of the presence of homogeneous or heterogeneous porous media, the CB concentrations in the effluent from the PRB columns were significantly lower than the natural sandy columns, suggesting that the iron and copper powders coupled with biochar particles could have a significant removal effect compared to the natural sand porous media in the first columns. CB was transported relatively quickly in the heterogeneous porous media, likely due to the fact that the contaminant residence time is proportional to the infiltration velocities in the different types of porous media. The average effluent CB concentrations from the heterogeneous porous media were lower than those from homogeneous porous media. The heterogeneity retarded the vertical infiltration of CB, leading to its extended lateral distribution. During the treatment process, benzene and phenol were observed as the products of CB degradation. The ultimate CB removal efficiency was 61.4% and 68.1%, demonstrating that the simulated PRB system with the mixture of iron, copper and biochar was effective at removing CB from homogeneous and heterogeneous aquifers.

  3. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  4. Strategic Considerations for the Sustainable Remediation of Nuclear Installations

    International Nuclear Information System (INIS)

    Miller, Susan; Wilson, Ian; Decung, Fabien; Ollivier Dehaye, Catherine; Pellenz, Gilles; Palut-Laurent, Odile; Nitzsche, Olaf; Rehs, Bernd; Altavilla, Massimo; Osimani, Celso; Florya, Sergey; Revilla, Jose-Luis; Efraimsson, Henrik; Baines, Kim; Clark, Anna; Cruickshank, Julian; Mitchell, Nick; Mobbs, Shelly; Orr, Peter; Abu-Eid, Rateb Boby; Durham, Lisa; Morse, John; Walker, Stuart; Weber, Inge; ); Monken-Fernandes, Horst; )

    2016-01-01

    Nuclear sites around the world are being decommissioned and remedial actions are being undertaken to enable sites, or parts of sites, to be reused. Although such activities are relatively straightforward for most sites, experience has suggested that preventative action is needed to minimise the impact of remediation activities on the environment and the potential burden to future generations. Removing all contamination in order to make a site suitable for any use generates waste and has associated environmental, social and economic drawbacks and benefits. Site remediation should thus be sustainable and result in an overall net benefit. This report draws on recent experience of NEA member countries in nuclear site remediation during decommissioning in order to identify strategic considerations for the sustainable remediation of subsurface contamination - predominantly contaminated soil and groundwater - to describe good practice, and to make recommendations for further research and development. It provides insights for the decision makers, regulators, implementers and stakeholders involved in nuclear site decommissioning so as to ensure the sustainable remediation of nuclear sites, now and in the future. (authors)

  5. Program summary for the Office of Remedial Action and Waste Technology

    International Nuclear Information System (INIS)

    1989-10-01

    The US Department of Energy is the lead Federal agency responsible for planning and implementing the programs that ensure safe and efficient management of nuclear wastes from both civilian and defense activities. Within the Department, three offices share this responsibility: the Office of Remedial Action and Waste Technology, the Office of Civilian Radioactive Waste Management, and the Office of Defense Waste and Transportation Management. This document summarizes the programs managed by the Office of Remedial Action and Waste Technology

  6. The Remedial Action Priority System (RAPS): Mathematical formulations

    International Nuclear Information System (INIS)

    Whelan, G.; Strenge, D.L.; Droppo, J.G. Jr.; Steelman, B.L.; Buck, J.W.

    1987-08-01

    The Remedial Action Priority System (RAPS) represents a methodology that prioritizes inactive hazardous and radioactive mixed-waste disposal sites in a scientific and objective manner based on limited site information. This methodology is intended to bridge the technology gap between the initial site evaluation using the Hazard Ranking System (HRS) and the time-consuming process of actual field site characterization, assessment, and remediation efforts. The RAPS methodology provides the US Department of Energy with a management tool for assistance in prioritizing funding and human resource allocations for further investigations and possible remediations at its inactive waste sites. Use of RAPS will help DOE ensure that those sites posing the highest potential risk are addressed first. Chapters 1 through 10 were processed separately for the Energy Data Base

  7. Tailings From Mining Activities, Impact on Groundwater, and Remediation

    Directory of Open Access Journals (Sweden)

    Khalid Al-Rawahy

    2001-12-01

    Full Text Available Effluent wastes from mining operations and beneficiation processes are comprized mostly of the following pollutants: total suspended solids (TTS, alkalinity or acidity (pH, settleable solids, iron in ferrous mining, and dissolved metals in nonferrous mining. Suspended solids consist of small particles of solid pollutants that resist separation by conventional means. A number of dissolved metals are considered toxic pollutants. The major metal pollutants present in ore mining and beneficiation waste waters include arsenic, cadmium, copper, lead, mercury, nickel, and zinc. Tailings ponds are used for both the disposal of solid waste and the treatment of waste-water streams. The supernatant decanted from these ponds contains suspended solids and, at times, process reagents introduced to the water during ore beneficiation. Leakage of material from tailings pond into groundwater is one possible source of water pollution in the mining industry. Percolation of waste-water from impoundment may occur if tailings ponds are not properly designed. This paper addresses potential groundwater pollution due to effluent from mining activities, and the possible remediation options.

  8. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ''may affect'' the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA)

  9. Remediation in Situ of Hydrocarbons by Combined Treatment in a Contaminated Alluvial Soil due to an Accidental Spill of LNAPL

    Directory of Open Access Journals (Sweden)

    Ettore Trulli

    2016-10-01

    Full Text Available Soil contamination represents an environmental issue which has become extremely important in the last decades due to the diffusion of industrial activities. Accidents during transport of dangerous materials and fuels may cause severe pollution. The present paper describes the criteria of the actions which were operated to remediate the potential risk and observed negative effects on groundwater and soil originating from an accidental spill of diesel fuel from a tank truck. With the aim to evaluate the quality of the involved environmental matrices in the “emergency” phase, in the following “safety” operation and during the remediation action, a specific survey on hydrocarbons, light and heavy, was carried out in the sand deposits soil. Elaboration of collected data allows us to observe the movement of pollutants in the unsaturated soil. The remediation action was finalized to improve the groundwater and soil quality. The former was treated by a so called “pump and treat” system coupled with air sparging. A train of three different technologies was applied to the unsaturated soil in a sequential process: soil vapour extraction, bioventing and enhanced bioremediation. Results showed that the application of sequential remediation treatments allowed us to obtain a state of quality in unsaturated soil and groundwater as required by Italian law.

  10. Development and implementation of a comprehensive groundwater protection program at the Savannah River Plant

    International Nuclear Information System (INIS)

    Gordon, D.E.

    1984-01-01

    The major goals of the groundwater protection program are to evaluate the impact on groundwater quality as a result of Savannah River Plant operations, to take corrective measures as required to restore or protect groundwater quality, and to ensure that future operations do not adversely affect the quality or availability of the groundwater resources at the site. The specific elements of this program include (1) continuation of an extensive groundwater monitoring program, (2) assessment of waste disposal sites for impacts on groundwater quality, (3) implementation of mitigative actions, as required, to restore or protect groundwater quality, (4) incorporation of groundwater protection concepts in the design of new production and waste management facilities, and (5) review of site utilization of groundwater resources to ensure compatibility with regional needs. The major focal points of the groundwater protection program are the assessment of waste disposal sites for impacts on groundwater quality and the implementation of remedial action projects. Many locations at SRP have been used as waste disposal sites for a variety of liquid and solid wastes. Field investigations are ongoing to determine the nature and extent of any contamination in the sediments and groundwater at these waste sites on a priority basis. Remedial action has been initiated. Certain aspects of the groundwater protection program have been identified as key to the success in achieving the desired objectives. Key elements of the program have included early identification of all the potential sources for groundwater contamination, development of an overall strategy for waste site assessment and mitigation, use of a flexible computerized system for data base management, and establishing good relationships with regulatory agencies. 10 references, 6 figures, 4 tables

  11. 44 CFR 19.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-10-01

    ... PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 19.110 Remedial and... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Remedial and affirmative action and self-evaluation. 19.110 Section 19.110 Emergency Management and Assistance FEDERAL EMERGENCY...

  12. Using modeling to develop and evaluate a corrective action system

    International Nuclear Information System (INIS)

    Rodgers, L.

    1995-01-01

    At a former trucking facility in EPA Region 4, a corrective action system was installed to remediate groundwater and soil contaminated with gasoline and fuel oil products released from several underground storage tanks (USTs). Groundwater modeling was used to develop the corrective action plan and later used with soil vapor modeling to evaluate the systems effectiveness. Groundwater modeling was used to determine the effects of a groundwater recovery system on the water table at the site. Information gathered during the assessment phase was used to develop a three dimensional depiction of the subsurface at the site. Different groundwater recovery schemes were then modeled to determine the most effective method for recovering contaminated groundwater. Based on the modeling and calculations, a corrective action system combining soil vapor extraction (SVE) and groundwater recovery was designed. The system included seven recovery wells, to extract both soil vapor and groundwater, and a groundwater treatment system. Operation and maintenance of the system included monthly system sampling and inspections and quarterly groundwater sampling. After one year of operation the effectiveness of the system was evaluated. A subsurface soil gas model was used to evaluate the effects of the SVE system on the site contamination as well as its effects on the water table and groundwater recovery operations. Groundwater modeling was used in evaluating the effectiveness of the groundwater recovery system. Plume migration and capture were modeled to insure that the groundwater recovery system at the site was effectively capturing the contaminant plume. The two models were then combined to determine the effects of the two systems, acting together, on the remediation process

  13. Particulate Pyrite Autotrophic Denitrification (PPAD) for Remediation of Nitrate-contaminated Groundwater

    Science.gov (United States)

    Tong, S.; Rodriguez-Gonzalez, L. C.; Henderson, M.; Feng, C.; Ergas, S. J.

    2015-12-01

    The rapid movement of human civilization towards urbanization, industrialization, and increased agricultural activities has introduced a large amount of nitrate into groundwater. Nitrate is a toxic substance discharged from groundwater to rivers and leads to decreased dissolved oxygen and eutrophication. For this experiment, an electron donor is needed to convert nitrate into non-toxic nitrogen gas. Pyrite is one of the most abundant minerals in the earth's crust making it an ideal candidate as an electron donor. The overall goal of this research was to investigate the potential for pyrite to be utilized as an electron donor for autotrophic denitrification of nitrate-contaminated groundwater. Batch studies of particulate pyrite autotrophic denitrification (PPAD) of synthetic groundwater (100 mg NO3--N L-1) were set up with varying biomass concentration, pyrite dose, and pyrite particle size. Reactors were seeded with mixed liquor volatile suspended solids (VSS) from a biological nitrogen removal wastewater treatment facility. PPAD using small pyrite particles (exhibited substantial nitrate removal rate, lower sulfate accumulation (5.46 mg SO42-/mg NO3--N) and lower alkalinity consumption (1.70 mg CaCO3/mg NO3--N) when compared to SOD (7.54 mg SO42-/mg NO3--N, 4.57 mg CaCO3/mg NO3--N based on stoichiometric calculation). This research revealed that the PPAD process is a promising technique for nitrate-contaminated groundwater treatment and promoted the utilization of pyrite in the field of environmental remediation.

  14. Background report for the uranium-mill-tailings-sites remedial-action program

    International Nuclear Information System (INIS)

    1981-04-01

    The Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, mandates remedial action responsibilities to the Department of Energy for designated inactive uranium processing sites. To comply with the mandates of the Act, a program to survey and evaluate the radiological conditions at inactive uranium processing sites and at vicinity properties containing residual radioactive material derived from the sites is being conducted; the Remedial Action Program Office, Office of the Assistant Secretary for Nuclear Energy is implementing remedial actions at these processing sites. This report provides a brief history of the program, a description of the scope of the program, and a set of site-specific summaries for the 22 locations specified in the Act and three additional locations designated in response to Federal Register notices issued on August 17 and September 5, 1979. It is designed to be a quick source of background information on sites covered by the implementation program for Public Law 95-604

  15. 17 CFR 200.735-13 - Disciplinary and other remedial action.

    Science.gov (United States)

    2010-04-01

    ... conflicting interest; (3) disciplinary action; or (4) disqualification for a particular assignment. Remedial action, whether disciplinary or otherwise, shall be effected in accordance with any applicable laws... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Disciplinary and other...

  16. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites Slick Rock, Colorado. Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VP) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the groundwater from further degradation. Remedial actions at the Slick Rock sites must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC).

  17. Numerical modeling of remediation of groundwater in a wellfield of in-situ leaching of uranium by pump-and-treat system

    International Nuclear Information System (INIS)

    Lv Junwen; Shi Wenge; Yang Yong

    2006-01-01

    Based on the hydrogeological conditions at the investigated site, the coupled mathematic model about the flow and the contaminant transportation in groundwater was established. The software Visual MODflow, the most popular simulation of groundwater flow and contaminant transportation, was used to study the contaminants distribution in groundwater during pumping at different pumping rates, and to determine the pumping well arrangement and optimal pumping rate, which directs the remediation of contaminated groundwater by the pump-and-treat system. (authors)

  18. Recommendations for computer modeling codes to support the UMTRA groundwater restoration project

    Energy Technology Data Exchange (ETDEWEB)

    Tucker, M.D. [Sandia National Labs., Albuquerque, NM (United States); Khan, M.A. [IT Corp., Albuquerque, NM (United States)

    1996-04-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Project is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the US. The surface restoration phase, which includes containment and stabilization of the abandoned uranium mill tailings piles, has a specific termination date and is nearing completion. Therefore, attention has now turned to the groundwater restoration phase, which began in 1991. Regulated constituents in groundwater whose concentrations or activities exceed maximum contaminant levels (MCLs) or background levels at one or more sites include, but are not limited to, uranium, selenium, arsenic, molybdenum, nitrate, gross alpha, radium-226 and radium-228. The purpose of this report is to recommend computer codes that can be used to assist the UMTRA groundwater restoration effort. The report includes a survey of applicable codes in each of the following areas: (1) groundwater flow and contaminant transport modeling codes, (2) hydrogeochemical modeling codes, (3) pump and treat optimization codes, and (4) decision support tools. Following the survey of the applicable codes, specific codes that can best meet the needs of the UMTRA groundwater restoration program in each of the four areas are recommended.

  19. Recommendations for computer modeling codes to support the UMTRA groundwater restoration project

    International Nuclear Information System (INIS)

    Tucker, M.D.; Khan, M.A.

    1996-04-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Project is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the US. The surface restoration phase, which includes containment and stabilization of the abandoned uranium mill tailings piles, has a specific termination date and is nearing completion. Therefore, attention has now turned to the groundwater restoration phase, which began in 1991. Regulated constituents in groundwater whose concentrations or activities exceed maximum contaminant levels (MCLs) or background levels at one or more sites include, but are not limited to, uranium, selenium, arsenic, molybdenum, nitrate, gross alpha, radium-226 and radium-228. The purpose of this report is to recommend computer codes that can be used to assist the UMTRA groundwater restoration effort. The report includes a survey of applicable codes in each of the following areas: (1) groundwater flow and contaminant transport modeling codes, (2) hydrogeochemical modeling codes, (3) pump and treat optimization codes, and (4) decision support tools. Following the survey of the applicable codes, specific codes that can best meet the needs of the UMTRA groundwater restoration program in each of the four areas are recommended

  20. Environmental summary of the F- and H-area seepage basins groundwater remediation project, Savannah River site

    International Nuclear Information System (INIS)

    Friday, G.P.

    1997-01-01

    This report summarizes the results of nearly 70 investigations of the baseline environment, describes the remedial action, and identifies constituents of interest that pose potential risk to human health and the environment. It also proposes an approach for evaluating the effectiveness of the remedial action

  1. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This Baseline Risk Assessment of Groundwater Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells. This risk assessment evaluates the most contaminated monitor wells at the processing site. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium.

  2. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado

    International Nuclear Information System (INIS)

    1993-12-01

    This Baseline Risk Assessment of Groundwater Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells. This risk assessment evaluates the most contaminated monitor wells at the processing site. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium

  3. Cost of presumptive source term Remedial Actions Laboratory for energy-related health research, University of California, Davis

    International Nuclear Information System (INIS)

    Last, G.V.; Bagaasen, L.M.; Josephson, G.B.; Lanigan, D.C.; Liikala, T.L.; Newcomer, D.R.; Pearson, A.W.; Teel, S.S.

    1995-12-01

    A Remedial Investigation/Feasibility Study (RI/FS) is in progress at the Laboratory for Energy Related Health Research (LEHR) at the University of California, Davis. The purpose of the RI/FS is to gather sufficient information to support an informed risk management decision regarding the most appropriate remedial actions for impacted areas of the facility. In an effort to expedite remediation of the LEHR facility, the remedial project managers requested a more detailed evaluation of a selected set of remedial actions. In particular, they requested information on both characterization and remedial action costs. The US Department of Energy -- Oakland Office requested the assistance of the Pacific Northwest National Laboratory to prepare order-of-magnitude cost estimates for presumptive remedial actions being considered for the five source term operable units. The cost estimates presented in this report include characterization costs, capital costs, and annual operation and maintenance (O ampersand M) costs. These cost estimates are intended to aid planning and direction of future environmental remediation efforts

  4. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use

  5. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use

  6. 36 CFR 1211.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-07-01

    ... action and self-evaluation. 1211.110 Section 1211.110 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION... affirmative action and self-evaluation. (a) Remedial action. If the designated agency official finds that a...

  7. Data Validation Package August 2015 Groundwater and Surface Water Sampling at the Tuba City, Arizona, Disposal Site November 2015

    Energy Technology Data Exchange (ETDEWEB)

    Bush, Richard [USDOE Office of Legacy Management, Washington, DC (United States); Lemke, Peter [Navarro Research and Engineering, Inc., Oak Ridge, TN (United States)

    2015-11-01

    The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells and extraction wells as listed in Table 1. The data from this sampling event are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.

  8. Data Validation Package February 2016 Groundwater and Surface Water Sampling at the Tuba City, Arizona, Disposal Site April 2016

    Energy Technology Data Exchange (ETDEWEB)

    Bush, Richard [USDOE Office of Legacy Management, Washington, DC (United States); Lemke, Peter [Navarro Research and Engineering, Inc., Oak Ridge, TN (United States)

    2016-04-01

    The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells as listed in Table 1. The data from this sampling event are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.

  9. An Integrated Simulation, Inference and Optimization Approach for Groundwater Remediation with Two-stage Health-Risk Assessment

    Directory of Open Access Journals (Sweden)

    Aili Yang

    2018-05-01

    Full Text Available In this study, an integrated simulation, inference and optimization approach with two-stage health risk assessment (i.e., ISIO-THRA is developed for supporting groundwater remediation for a petroleum-contaminated site in western Canada. Both environmental standards and health risk are considered as the constraints in the ISIO-THRA model. The health risk includes two parts: (1 the health risk during the remediation process and (2 the health risk in the natural attenuation period after remediation. In the ISIO-THRA framework, the relationship between contaminant concentrations and time is expressed through first-order decay models. The results demonstrate that: (1 stricter environmental standards and health risk would require larger pumping rates for the same remediation duration; (2 higher health risk may happen in the period of the remediation process; (3 for the same environmental standard and acceptable health-risk level, the remediation techniques that take the shortest time would be chosen. ISIO-THRA can help to systematically analyze interaction among contaminant transport, remediation duration, and environmental and health concerns, and further provide useful supportive information for decision makers.

  10. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  11. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-01-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded

  12. UMTRA [Uranium Mill Tailings Remedial Action] Project site management manual

    International Nuclear Information System (INIS)

    1990-10-01

    The purpose of this manual is to summarize the organizational interfaces and the technical approach used to manage the planning, design development, National Environmental Policy Act (NEPA) compliance, engineering, and remedial action required to stabilize and control the designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites. This manual describes the Project's objective, participants' roles and responsibilities, technical approach for accomplishing the objective, and planning and managerial controls to be used in performing the site work. The narrative follows the flow of activities depicted in Figure 1.1, which provides the typical sequence of key Project activities. A list of acronyms used is presented at the end of the manual. The comparable manual for UMTRA Project vicinity properties is the ''Vicinity Properties Management and Implementation Manual'' (VPMIM) (UMTRA-DOE/AL-050601). Together, the two manuals cover the remedial action activities associated with UMTRA Project sites. The UMTRA Project's objective is to stabilize and control the uranium mill tailings, vicinity property materials, and other residual radioactive materials at the designated sites (Figure 1.2) in a safe and environmentally sound manner in order to minimize radiation health hazards to the public. 26 figs., 6 tabs

  13. Dose assessment of remedial action for uranium tailing impoundment of a nuclear factory

    International Nuclear Information System (INIS)

    Li Xutong; Ma Ruwei; Guo Zede

    2000-01-01

    A large uranium tailing impoundment in China will be closure and remedial action have been planned. The remedial action will include shaping and covering the dam and beach in order to prevent the impoundment from damage and restrict spread of tailing sands and emission of radon. The author presents the analysis and estimation of the exposure to workers for remedial action and to public after the remedial action. To estimate the exposure to workers, the pathway of inhalation of radon, tailing sands in suspension and external γ exposure were taken into consideration. The exposure scenario is considered as probably maximum exposure to the workers who work on the tailing pile without any protection measures, the dose is 6.0 mSv/a. Two situation for the exposure to public after remedial action were considered: normal and abnormal condition. For the normal condition, inhalation of radon emitted from impoundment is only the pathway to public for the exposure, and individual dose for critical group of public is 0.053 mSv/a, collective dose for population within 80 km is 1.0 man·Sv/a. For the abnormal conditions, four scenarios were considered, i.e. dwelling on tailing pile, farming on tailing pile, living in a house built by contaminated materials and some temporal activities on the pile. The scenarios of dwellings is living in a house on the pile and drinking contaminated water. The maximum individual dose is 27 mSv/a

  14. Remedial Action Plan for Expanded Bioventing System Facility 6454

    National Research Council Canada - National Science Library

    1996-01-01

    This draft remedial action plan (RAP) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at Site 6454 at Vandenberg Air Force Base (AFB), California...

  15. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA)

  16. Annual status report on the Uranium Mill Tailings Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA).

  17. Speciation of As in calcite by micro-XAFS: Implications for remediation of As contamination in groundwater

    International Nuclear Information System (INIS)

    Yokoyama, Y; Takahashi, Y; Iwatsuki, T; Terada, Y

    2013-01-01

    To evaluate the role of calcite as a host phase of arsenic (As) in As-contaminated groundwater, distribution behavior of Asbetween natural calcite and groundwater in deep underground was investigated based on As oxidation state. Speciation analyses of As in natural calcite by μ-XRF-XAFS analyses showed (i) preferentialarsenate uptake by calcite, and (ii) promptness of arsenate uptake by minor iron (Fe) carbonate minerals coprecipitated with calcite. These findings suggest that the effect of calcite on As remediation of the As-contamination systems stronglydepends on arsenite to arsenate ratio (i.e., redox condition) in groundwater, and maybe governed bythe amount of Fe coprecipitated with calcite.

  18. Agar agar-stabilized milled zerovalent iron particles for in situ groundwater remediation

    Energy Technology Data Exchange (ETDEWEB)

    Velimirovic, Milica; Schmid, Doris; Wagner, Stephan; Micić, Vesna; Kammer, Frank von der; Hofmann, Thilo, E-mail: thilo.hofmann@univie.ac.at

    2016-09-01

    Submicron-scale milled zerovalent iron (milled ZVI) particles produced by grinding macroscopic raw materials could provide a cost-effective alternative to nanoscale zerovalent iron (nZVI) particles for in situ degradation of chlorinated aliphatic hydrocarbons in groundwater. However, the aggregation and settling of bare milled ZVI particles from suspension presents a significant obstacle to their in situ application for groundwater remediation. In our investigations we reduced the rapid aggregation and settling rate of bare milled ZVI particles from suspension by stabilization with a “green” agar agar polymer. The transport potential of stabilized milled ZVI particle suspensions in a diverse array of natural heterogeneous porous media was evaluated in a series of well-controlled laboratory column experiments. The impact of agar agar on trichloroethene (TCE) removal by milled ZVI particles was assessed in laboratory-scale batch reactors. The use of agar agar significantly enhanced the transport of milled ZVI particles in all of the investigated porous media. Reactivity tests showed that the agar agar-stabilized milled ZVI particles were reactive towards TCE, but that their reactivity was an order of magnitude less than that of bare, non-stabilized milled ZVI particles. Our results suggest that milled ZVI particles could be used as an alternative to nZVI particles as their potential for emplacement into contaminated zone, their reactivity, and expected longevity are beneficial for in situ groundwater remediation. - Highlights: • Rapid aggregation and sedimentation were observed in bare milled ZVI particles. • Agar agar improved the stability of milled ZVI particle suspensions. • Agar agar enhanced the transport of milled ZVI particles in heterogeneous sands. • Agar agar reduced the reactivity of milled ZVI particles towards TCE.

  19. Agar agar-stabilized milled zerovalent iron particles for in situ groundwater remediation

    International Nuclear Information System (INIS)

    Velimirovic, Milica; Schmid, Doris; Wagner, Stephan; Micić, Vesna; Kammer, Frank von der; Hofmann, Thilo

    2016-01-01

    Submicron-scale milled zerovalent iron (milled ZVI) particles produced by grinding macroscopic raw materials could provide a cost-effective alternative to nanoscale zerovalent iron (nZVI) particles for in situ degradation of chlorinated aliphatic hydrocarbons in groundwater. However, the aggregation and settling of bare milled ZVI particles from suspension presents a significant obstacle to their in situ application for groundwater remediation. In our investigations we reduced the rapid aggregation and settling rate of bare milled ZVI particles from suspension by stabilization with a “green” agar agar polymer. The transport potential of stabilized milled ZVI particle suspensions in a diverse array of natural heterogeneous porous media was evaluated in a series of well-controlled laboratory column experiments. The impact of agar agar on trichloroethene (TCE) removal by milled ZVI particles was assessed in laboratory-scale batch reactors. The use of agar agar significantly enhanced the transport of milled ZVI particles in all of the investigated porous media. Reactivity tests showed that the agar agar-stabilized milled ZVI particles were reactive towards TCE, but that their reactivity was an order of magnitude less than that of bare, non-stabilized milled ZVI particles. Our results suggest that milled ZVI particles could be used as an alternative to nZVI particles as their potential for emplacement into contaminated zone, their reactivity, and expected longevity are beneficial for in situ groundwater remediation. - Highlights: • Rapid aggregation and sedimentation were observed in bare milled ZVI particles. • Agar agar improved the stability of milled ZVI particle suspensions. • Agar agar enhanced the transport of milled ZVI particles in heterogeneous sands. • Agar agar reduced the reactivity of milled ZVI particles towards TCE.

  20. Simulant composition for the Mixed Waste Management Facility (MWMF) groundwater remediation project

    International Nuclear Information System (INIS)

    Siler, J.L.

    1992-01-01

    A project has been initiated at the request of ER to study and remediate the groundwater contamination at the Mixed Waste Management Facility (MWMF). This water contains a wide variety of both inorganics (e.g., sodium) and organics (e.g., benzene, trichloroethylene). Most compounds are present in the ppB range, and certain components (e.g., trichloroethylene, silver) are present at concentrations that exceed the primary drinking water standards (PDWS). These compounds must be reduced to acceptable levels as per RCRA and CERCLA orders. This report gives a listing of the important constituents which are to be included in a simulant to model the MWMF aquifer. This simulant will be used to evaluate the feasibility of various state of the art separation/destruction processes for remediating the aquifer

  1. Modifications to the Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Green River, Utah

    International Nuclear Information System (INIS)

    1991-10-01

    This modification to the Green River Final Remedial Action Plan (FRAP) represents the changes made to the document in accordance with a joint agreement between the US Department of Energy (DOE) and the US Nuclear Regulatory Commission (NRC) outlined in a letter dated August 7, 1991. As specified in this letter, methylene chloride will no longer be analyzed in groundwater samples collected from on-site monitor wells. All references to methylene chloride sampling have been deleted from the FRAP, as indicated by the pages in Section 2.0 of this document

  2. Numerical modeling analysis of VOC removal processes in different aerobic vertical flow systems for groundwater remediation

    NARCIS (Netherlands)

    De Biase, C.; Carminati, A.; Oswald, S.E.; Thullner, M.

    2013-01-01

    Vertical flow systems filled with porous medium have been shown to efficiently remove volatile organic contaminants (VOCs) from contaminated groundwater. To apply this semi-natural remediation strategy it is however necessary to distinguish between removal due to biodegradation and due to volatile

  3. Using the natural biodegradation potential of shallow soils for in-situ remediation of deep vadose zone and groundwater

    Energy Technology Data Exchange (ETDEWEB)

    Avishai, Lior; Siebner, Hagar; Dahan, Ofer, E-mail: odahan@bgu.ac.il; Ronen, Zeev, E-mail: zeevrone@bgu.ac.il

    2017-02-15

    Highlights: • Integrated in-situ remediation treatment for soil, vadose zone and groundwater. • Turning the topsoil into an efficient bioreactor for perchlorate degradation. • Treating perchlorate leachate from the deep vadose zone in the topsoil. • Zero effluents discharge from the remediation process. - Abstract: In this study, we examined the ability of top soil to degrade perchlorate from infiltrating polluted groundwater under unsaturated conditions. Column experiments designed to simulate typical remediation operation of daily wetting and draining cycles of contaminated water amended with an electron donor. Covering the infiltration area with bentonite ensured anaerobic conditions. The soil remained unsaturated, and redox potential dropped to less than −200 mV. Perchlorate was reduced continuously from ∼1150 mg/L at the inlet to ∼300 mg/L at the outlet in daily cycles. Removal efficiency was between 60 and 84%. No signs of bioclogging were observed during three operation months although occasional iron reduction observed due to excess electron donor. Changes in perchlorate reducing bacteria numbers were inferred from an increased in pcrA gene abundances from ∼10{sup 5} to 10{sup 7} copied per gram at the end of the experiment indicating the growth of perchlorate-reducing bacteria. We proposed that the topsoil may serve as a bioreactor to treat high concentrations of perchlorate from the contaminated groundwater. The treated water that infiltrates from the topsoil through the vadose zone could be used to flush perchlorate from the deep vadose zone into the groundwater where it is retrieved again for treatment in the topsoil.

  4. Using the natural biodegradation potential of shallow soils for in-situ remediation of deep vadose zone and groundwater

    International Nuclear Information System (INIS)

    Avishai, Lior; Siebner, Hagar; Dahan, Ofer; Ronen, Zeev

    2017-01-01

    Highlights: • Integrated in-situ remediation treatment for soil, vadose zone and groundwater. • Turning the topsoil into an efficient bioreactor for perchlorate degradation. • Treating perchlorate leachate from the deep vadose zone in the topsoil. • Zero effluents discharge from the remediation process. - Abstract: In this study, we examined the ability of top soil to degrade perchlorate from infiltrating polluted groundwater under unsaturated conditions. Column experiments designed to simulate typical remediation operation of daily wetting and draining cycles of contaminated water amended with an electron donor. Covering the infiltration area with bentonite ensured anaerobic conditions. The soil remained unsaturated, and redox potential dropped to less than −200 mV. Perchlorate was reduced continuously from ∼1150 mg/L at the inlet to ∼300 mg/L at the outlet in daily cycles. Removal efficiency was between 60 and 84%. No signs of bioclogging were observed during three operation months although occasional iron reduction observed due to excess electron donor. Changes in perchlorate reducing bacteria numbers were inferred from an increased in pcrA gene abundances from ∼10"5 to 10"7 copied per gram at the end of the experiment indicating the growth of perchlorate-reducing bacteria. We proposed that the topsoil may serve as a bioreactor to treat high concentrations of perchlorate from the contaminated groundwater. The treated water that infiltrates from the topsoil through the vadose zone could be used to flush perchlorate from the deep vadose zone into the groundwater where it is retrieved again for treatment in the topsoil.

  5. Update on the National Groundwater and Soil Remediation Program (GASReP)

    International Nuclear Information System (INIS)

    Lye, A.

    1992-01-01

    The national Groundwater and Soil Remediation Program (GASReP), supported jointly by government and the petroleum industry, targets research on innovative ways to clean up groundwater and soil contaminated with petroleum hydrocarbons, and conducts technology transfer sessions. Within its broad context as an initiative for research, development and demonstration of innovative cleanup technologies, GASReP now targets basic applied research and/or technology development only. Industry partners and other government programs will be encouraged to extend GASReP research findings to the final stage of technology demonstration. During 1991-92 GASReP shifted its attention from starting new projects to evaluating the program, setting a new direction, and establishing a better way to seek ideas for projects. Unlike previous years, only three projects began during this period. Two technology development projects are iron and manganese pre-treatment for pump and treat clean-up systems, and surface bioreactor to clean soil/waste contaminated with petroleum hydrocarbons. The one technology assessment project dealt with a review of six technologies for in-situ bioremediation of BTEX (benzene, toluene, ethylbenzene, xylene) in groundwater. Current program direction, interests, and research needs are summarized, and candidate proposals for project selection in 1992-93 are listed

  6. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  7. Remedial actions at the former Union Carbide Corporation uranium mill sites, Rifle, Garfield County, Colorado: Final environmental impact statement

    International Nuclear Information System (INIS)

    1990-03-01

    This appendix provides the information needed to understand the conceptual designs for the remedial action alternatives addressed in this environmental impact statement (EIS). It is intended to provide sufficient details for the reader to evaluate the feasibility and assess the impacts of each remedial action alternative. It is not intended to provide the detailed engineering necessary to implement the alternatives. Details of the preferred remedial action will be presented in the remedial action plan (RAP). The remedial action alternatives addressed in this EIS include no action, stabilization at the New Rifle site, disposal at the Estes Gulch site, and disposal at the Lucas Mesa site. All alternatives include interim actions to remediate existing health and safety hazards to the Rifle community that presently exist at the Old and New Rifle processing sites. 21 figs., 18 tabs

  8. Bioremediation of Uranium-Contaminated Groundwater using Engineered Injection and Extraction

    Science.gov (United States)

    Greene, J. A.; Neupauer, R.; Ye, M.; Kasprzyk, J. R.; Mays, D. C.; Curtis, G. P.

    2017-12-01

    During in-situ remediation of contaminated groundwater, a treatment chemical is injected into the contaminated groundwater to react with and degrade the contaminant, with reactions occurring where the treatment chemical contacts the contaminant. Traditional in-situ groundwater remediation relies on background groundwater flow for spreading of treatment chemicals into contaminant plumes. Engineered Injection and Extraction (EIE), in which time-varying induced flow fields are used to actively spread the treatment chemical into the contaminant plume, has been developed to increase contact between the contaminant and treatment chemical, thereby enhancing contaminant degradation. EIE has been investigated for contaminants that degrade through irreversible bimolecular reaction with a treatment chemical, but has not been investigated for a contaminant governed by reversible reactions. Uranium primarily occurs in its aqueous, mobile form, U(VI), in the environment but can be bioreduced to its sparingly soluble, immobile form, U(IV), by iron reducing bacteria stimulated by an acetate amendment. In this study, we investigate the ability of EIE to facilitate and sustain favorable conditions to immobilize uranium during remediation, and to prevent re-mobilization of uranium into the aqueous phase after active remediation has ended. Simulations in this investigation are conducted using a semi-synthetic model based on physical and chemical conditions at the Naturita Uranium Mill Tailings Remedial Action (UMTRA) site in southwestern Colorado and the Old Rifle UMTRA site in western Colorado. The EIE design is optimized for the synthetic model using the Borg multi-objective evolutionary algorithm.

  9. Hanford Site Groundwater Monitoring for Fiscal Year 2003

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

    2004-04-12

    This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2003 (October 2002 through September 2003) on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes in groundwater are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. The largest portions of these plumes are migrating from the central Hanford Site to the southeast, toward the Columbia River. Concentrations of tritium, nitrate, and some other contaminants continued to exceed drinking water standards in groundwater discharging to the river in some locations. However, contaminant concentrations in river water remained low and were far below standards. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the central part of the Hanford Site. Hexavalent chromium is present in smaller plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath all but one of the reactor areas, and technetium-99 and uranium are present in the 200 Areas. Uranium exceeds standards in the 300 Area in the south part of the Hanford Site. Minor contaminant plumes with concentrations greater than standards include carbon-14, cesium-137, cis-1,2-dichloroethene, cyanide, fluoride, plutonium, and trichloroethene. Monitoring for the ''Comprehensive Environmental Response, Compensation, and Liability Act'' is conducted in 11 groundwater operable units. The purpose of this monitoring is to define and track plumes and to monitor the effectiveness of interim remedial actions. Interim groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100-K, 100-D, and 100-H) and strontium-90 (100-N) reaching the Columbia River. The objective of two interim remediation systems in the 200 West Area is to prevent the spread of carbon

  10. In Situ Remediation Integrated Program: Technology summary

    International Nuclear Information System (INIS)

    1994-02-01

    The In Situ Remediation Integrated Program (ISR IP) was instituted out of recognition that in situ remediation could fulfill three important criteria: significant cost reduction of cleanup by eliminating or minimizing excavation, transportation, and disposal of wastes; reduced health impacts on workers and the public by minimizing exposure to wastes during excavation and processing; and remediation of inaccessible sites, including: deep subsurfaces, in, under, and around buildings. Buried waste, contaminated soils and groundwater, and containerized wastes are all candidates for in situ remediation. Contaminants include radioactive wastes, volatile and non-volatile organics, heavy metals, nitrates, and explosive materials. The ISR IP intends to facilitate development of in situ remediation technologies for hazardous, radioactive, and mixed wastes in soils, groundwater, and storage tanks. Near-term focus is on containment of the wastes, with treatment receiving greater effort in future years. ISR IP is an applied research and development program broadly addressing known DOE environmental restoration needs. Analysis of a sample of 334 representative sites by the Office of Environmental Restoration has shown how many sites are amenable to in situ remediation: containment--243 sites; manipulation--244 sites; bioremediation--154 sites; and physical/chemical methods--236 sites. This needs assessment is focused on near-term restoration problems (FY93--FY99). Many other remediations will be required in the next century. The major focus of the ISR EP is on the long term development of permanent solutions to these problems. Current needs for interim actions to protect human health and the environment are also being addressed

  11. In Situ Remediation Integrated Program: Technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The In Situ Remediation Integrated Program (ISR IP) was instituted out of recognition that in situ remediation could fulfill three important criteria: significant cost reduction of cleanup by eliminating or minimizing excavation, transportation, and disposal of wastes; reduced health impacts on workers and the public by minimizing exposure to wastes during excavation and processing; and remediation of inaccessible sites, including: deep subsurfaces, in, under, and around buildings. Buried waste, contaminated soils and groundwater, and containerized wastes are all candidates for in situ remediation. Contaminants include radioactive wastes, volatile and non-volatile organics, heavy metals, nitrates, and explosive materials. The ISR IP intends to facilitate development of in situ remediation technologies for hazardous, radioactive, and mixed wastes in soils, groundwater, and storage tanks. Near-term focus is on containment of the wastes, with treatment receiving greater effort in future years. ISR IP is an applied research and development program broadly addressing known DOE environmental restoration needs. Analysis of a sample of 334 representative sites by the Office of Environmental Restoration has shown how many sites are amenable to in situ remediation: containment--243 sites; manipulation--244 sites; bioremediation--154 sites; and physical/chemical methods--236 sites. This needs assessment is focused on near-term restoration problems (FY93--FY99). Many other remediations will be required in the next century. The major focus of the ISR EP is on the long term development of permanent solutions to these problems. Current needs for interim actions to protect human health and the environment are also being addressed.

  12. An overview of remedial action technical information support activities funded by the US Department of Energy's Office of Environmental Restoration

    International Nuclear Information System (INIS)

    Owen, P.T.

    1990-01-01

    In 1979 the US Department of Energy (DOE) established the Remedial Action Program Information Center (RAPIC) at the Oak Ridge National Laboratory (ORNL) to provide technical information support to the DOE's Remedial Action Programs, which comprise: Formerly Utilized Sites Remedial Action Program (FUSRAP), Surplus Facilities Management Program (SFMP), and Uranium Mill Tailings Remedial Action Program (UMTRAP). Specific information activities that RAPIC performs to support the DOE's programs include: maintaining a computerized bibliographic database containing approximately 7000 annotated references relevant to remediation work at radioactively contaminated sites; publishing an annual bibliography, Nuclear Facility Decommissioning and Site Remedial Actions, A Selected Bibliography, ORNL/EIS-154; maintaining a document repository and providing copies of requested publications; and performing manual and computerized searches of the technical literature. The most important RAPIC function is serving as a focal point for remedial action information. With these extensive resources at its command, RAPIC is in a unique position to provide a comprehensive information base to the remedial action and environmental restoration community

  13. Remedial Process Optimization and Green In-Situ Ozone Sparging for Treatment of Groundwater Impacted with Petroleum Hydrocarbons

    Science.gov (United States)

    Leu, J.

    2012-12-01

    A former natural gas processing station is impacted with TPH and BTEX in groundwater. Air sparging and soil vapor extraction (AS/AVE) remediation systems had previously been operated at the site. Currently, a groundwater extraction and treatment system is operated to remove the chemicals of concern (COC) and contain the groundwater plume from migrating offsite. A remedial process optimization (RPO) was conducted to evaluate the effectiveness of historic and current remedial activities and recommend an approach to optimize the remedial activities. The RPO concluded that both the AS/SVE system and the groundwater extraction system have reached the practical limits of COC mass removal and COC concentration reduction. The RPO recommended an in-situ chemical oxidation (ISCO) study to evaluate the best ISCO oxidant and approach. An ISCO bench test was conducted to evaluate COC removal efficiency and secondary impacts to recommend an application dosage. Ozone was selected among four oxidants based on implementability, effectiveness, safety, and media impacts. The bench test concluded that ozone demand was 8 to 12 mg ozone/mg TPH and secondary groundwater by-products of ISCO include hexavalent chromium and bromate. The pH also increased moderately during ozone sparging and the TDS increased by approximately 20% after 48 hours of ozone treatment. Prior to the ISCO pilot study, a capture zone analysis (CZA) was conducted to ensure containment of the injected oxidant within the existing groundwater extraction system. The CZA was conducted through a groundwater flow modeling using MODFLOW. The model indicated that 85%, 90%, and 95% of an injected oxidant could be captured when a well pair is injecting and extracting at 2, 5, and 10 gallons per minute, respectively. An ISCO pilot test using ozone was conducted to evaluate operation parameters for ozone delivery. The ozone sparging system consisted of an ozone generator capable of delivering 6 lbs/day ozone through two ozone

  14. Hanford sitewide grounwater remediation - supporting technical information

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1996-05-01

    The Hanford Sitewide Groundwater Remediation Strategy was issued in 1995 to establish overall goals for groundwater remediation on the Hanford Site. This strategy is being refined to provide more detailed justification for remediation of specific plumes and to provide a decision process for long-range planning of remediation activities. Supporting this work is a comprehensive modeling study to predict movement of the major site plumes over the next 200 years to help plan the remediation efforts. The information resulting from these studies will be documented in a revision to the Strategy and the Hanford Site Groundwater Protection Management Plan. To support the modeling work and other studies being performed to refine the strategy, this supporting technical information report has been produced to compile all of the relevant technical information collected to date on the Hanford Site groundwater contaminant plumes. The primary information in the report relates to conceptualization of the source terms and available history of groundwater transport, and description of the contaminant plumes. The primary information in the report relates to conceptualization of the source terms and available history of groundwater transport, description of the contaminant plumes, rate of movement based on the conceptual model and monitoring data, risk assessment, treatability study information, and current approach for plume remediation

  15. Nuclear facility decommissioning and site remedial actions. Volume 1. A selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Faust, R.A.; Fore, C.S.; Knox, N.P.

    1980-09-01

    This bibliography of 633 references represents the first in a series to be produced by the Remedial Actions Program Information Center (RAPIC) containing scientific, technical, economic, and regulatory information concerning the decommissioning of nuclear facilities. Major chapters selected for this bibliography are Facility Decommissioning, Uranium Mill Tailings Cleanup, Contaminated Site Restoration, and Criteria and Standards. The references within each chapter are arranged alphabetically by leading author, corporate affiliation, or title of the document. When the author is not given, the corporate affiliation appears first. If these two levels of authorship are not given, the title of the document is used as the identifying level. Indexes are provided for (1) author(s), (2) keywords, (3) title, (4) technology development, and (5) publication description. An appendix of 123 entries lists recently acquired references relevant to decommissioning of nuclear facilities. These references are also arranged according to one of the four subject categories and followed by author, title, and publication description indexes. The bibliography was compiled from a specialized data base established and maintained by RAPIC to provide information support for the Department of Energy's Remedial Actions Program, under the cosponsorship of its three major components: Surplus Facilities Management Program, Uranium Mill Tailings Remedial Actions Program, and Formerly Utilized Sites Remedial Actions Program. RAPIC is part of the Ecological Sciences Information Center within the Information Center Complex at Oak Ridge National Laboratory.

  16. Nuclear facility decommissioning and site remedial actions. Volume 1. A selected bibliography

    International Nuclear Information System (INIS)

    Faust, R.A.; Fore, C.S.; Knox, N.P.

    1980-09-01

    This bibliography of 633 references represents the first in a series to be produced by the Remedial Actions Program Information Center (RAPIC) containing scientific, technical, economic, and regulatory information concerning the decommissioning of nuclear facilities. Major chapters selected for this bibliography are Facility Decommissioning, Uranium Mill Tailings Cleanup, Contaminated Site Restoration, and Criteria and Standards. The references within each chapter are arranged alphabetically by leading author, corporate affiliation, or title of the document. When the author is not given, the corporate affiliation appears first. If these two levels of authorship are not given, the title of the document is used as the identifying level. Indexes are provided for (1) author(s), (2) keywords, (3) title, (4) technology development, and (5) publication description. An appendix of 123 entries lists recently acquired references relevant to decommissioning of nuclear facilities. These references are also arranged according to one of the four subject categories and followed by author, title, and publication description indexes. The bibliography was compiled from a specialized data base established and maintained by RAPIC to provide information support for the Department of Energy's Remedial Actions Program, under the cosponsorship of its three major components: Surplus Facilities Management Program, Uranium Mill Tailings Remedial Actions Program, and Formerly Utilized Sites Remedial Actions Program. RAPIC is part of the Ecological Sciences Information Center within the Information Center Complex at Oak Ridge National Laboratory

  17. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 3, Groundwater hydrology report

    International Nuclear Information System (INIS)

    1991-12-01

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent groundwater contamination resulting from processing activities at inactive uranium milling sites. According to the Uranium Mill Tailings Radiation Control Act of 1978, (UMTRCA) the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined this assessment shall include information on hydrogeologic site characterization. The water resources protection strategy that describes how the proposed action will comply with the EPA groundwater protection standards is presented in Attachment 4. Site characterization activities discussed in this section include: Characterization of the hydrogeologic environment; characterization of existing groundwater quality; definition of physical and chemical characteristics of the potential contaminant source; and description of local water resources

  18. A demonstration of the applicability of implementing the enhanced Remedial Action Priority System (RAPS) for environmental releases

    Energy Technology Data Exchange (ETDEWEB)

    Whelan, G.; Droppo, J.G. Jr.; Strenge, D.L.; Walter, M.B.; Buck, J.W.

    1989-12-01

    The Remedial Action Priority System (RAPS) and the Multimedia Environmental Pollutant Assessment System (MEPAS) were developed to prioritize problems associated with potential releases of hazardous chemical and radioactive materials in a scientific and objective manner based on limited site information. This report documents the model testing efforts of the RAPS/MEPAS methodology for the atmospheric, surface water, groundwater, and exposure components. Comparisons are given of model outputs with measured data at three sites: the US Department of Energy's Mound facility in Ohio and Hanford facility in Washington, and a chromium-cadmium plating site in New York. The results show that the simulated magnitudes, spacial and temporal trends, and distributions of contaminants corresponded well with the measured data. 25 refs., 86 figs., 26 tabs.

  19. Successful community relations efforts at the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    McKee, James E. Jr.; Meyer, Linda L.

    1992-01-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) Community Relations Program involves many participants from the U.S. Department of Energy (DOE) and the Prime Management Contractor (PMC) composed of M.K. Ferguson and Jacobs Engineering. The proactive community relations plan exceeds the compliance requirements of NEPA and CERCLA and is coordinated by a three-person staff of professional communicators. The program permeates many of the operating decisions and the result has been public acceptance of the Project and its actions to date, which has been to conduct remedial actions that will place the site in a radiologically and chemically safe condition, eliminating potential hazards to the public and environment. (author)

  20. Use of time and materials and cost reimbursement subcontracts for remedial actions under the alternative remedial contracting strategy contracts. Directive

    International Nuclear Information System (INIS)

    1992-01-01

    The directive is intended to establish agency guidance on the use of time and materials and cost reimbursement contracts for remedial actions in general and to provide specific instruction regarding the use of these approaches in subcontracting under the Alternative Remedial Contracting Strategy (ARCS) contracts

  1. Remedial Action Assessment System: A computer-based methodology for conducting feasibility studies

    International Nuclear Information System (INIS)

    White, M.K.; Buelt, J.L.; Stottlemyre, J.A.

    1991-02-01

    Because of the complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, DOE is supporting the development of a computer-based methodology to streamline the remedial investigation/feasibility study process. The Remedial Action Assessment System (RAAS), can be used for screening, linking, and evaluating established technology processes in support of conducting feasibility studies. It is also intended to do the same in support of corrective measures studies. The user interface employs menus, windows, help features, and graphical information while RAAS is in operation. Object-oriented programming is used to link unit processes into sets of compatible processes that form appropriate remedial alternatives. Once the remedial alternatives are formed, the RAAS methodology can evaluate them in terms of effectiveness, implementability, and cost. RAAS will access a user-selected risk assessment code to determine the reduction of risk after remedial action by each recommended alternative. The methodology will also help determine the implementability of the remedial alternatives at a site and access cost estimating tools to provide estimates of capital, operating, and maintenance costs. This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses graphical, tabular and textual information about technologies, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab

  2. DOE groundwater protection strategy

    International Nuclear Information System (INIS)

    Lichtman, S.

    1988-01-01

    EH is developing a DOE-wide Groundwater Quality Protection Strategy to express DOE's commitment to the protection of groundwater quality at or near its facilities. This strategy responds to a September 1986 recommendation of the General Accounting Office. It builds on EPA's August 1984 Ground-Water Protection Strategy, which establishes a classification system designed to protect groundwater according to its value and vulnerability. The purposes of DOE's strategy are to highlight groundwater protection as part of current DOE programs and future Departmental planning, to guide DOE managers in developing site-specific groundwater protection practices where DOE has discretion, and to guide DOE's approach to negotiations with EPA/states where regulatory processes apply to groundwater protection at Departmental facilities. The strategy calls for the prevention of groundwater contamination and the cleanup of groundwater commensurate with its usefulness. It would require long-term groundwater protection with reliance on physical rather than institutional control methods. The strategy provides guidance on providing long-term protection of groundwater resources; standards for new remedial actions;guidance on establishing points of compliance; requirements for establishing classification review area; and general guidance on obtaining variances, where applicable, from regulatory requirements. It also outlines management tools to implement this strategy

  3. Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, P.; Biang, C.; Haffenden, R.; Goyette, M.; Martino, L.; Patton, T.; Yuen, C.

    1995-05-01

    The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.

  4. Generic radiological characterization protocol for surveys conducted for DOE remedial action programs

    International Nuclear Information System (INIS)

    Berven, B.A.; Cottrell, W.D.; Leggett, R.W.; Little, C.A.; Myrick, T.E.; Goldsmith, W.A.; Haywood, F.F.

    1986-05-01

    This report describes goals and methodology that can be used by radiological survey contractors in surveys at properties associated with the Department of Energy's remedial action programs. The description includes: (1) a general discussion of the history of the remedial action programs; (2) the types of surveys that may be employed by the Radiological Survey Activities (RASA) contractor; (3) generic survey methods that may be used during radiological surveys; and (4) a format for presenting information and data in a survey report. 9 refs

  5. Biogeochemical dynamics of pollutants in Insitu groundwater remediation systems

    Science.gov (United States)

    Kumar, N.; Millot, R.; Rose, J.; Négrel, P.; Battaglia-Brunnet, F.; Diels, L.

    2010-12-01

    Insitu (bio) remediation of groundwater contaminants has been area of potential research interest in last few decades as the nature of contaminant encountered has also changed drastically. This gives tough challenge to researchers in finding a common solution for all contaminants together in one plume. Redox processes play significant role in pollutant dynamics and mobility in such systems. Arsenic particularly in reduced environments can get transformed into its reduced form (As3+), which is apparently more mobile and highly toxic. Also parallel sulfate reduction can lead to sulfide production and formation of thioarsenic species. On the other hand heavy metals (Zn, Fe, and Cd) in similar conditions will favour more stable metal sulfide precipitation. In the present work, we tested Zero Valent Iron (ZVI) in handling such issues and found promising results. Although it has been well known for contaminants like arsenic and chlorinated compounds but not much explored for heavy metals. Its high available surface area supports precipitation and co -precipitation of contaminants and its highly oxidizing nature and water born hydrogen production helps in stimulation of microbial activities in sediment and groundwater. These sulfate and Iron reducing bacteria can further fix heavy metals as stable metal sulfides by using hydrogen as potential electron donor. In the present study flow through columns (biotic and control) were set up in laboratory to understand the behaviour of contaminants in subsurface environments, also the impact of microbiology on performance of ZVI was studied. These glass columns (30 x 4cm) with intermediate sampling points were monitored over constant temperature (20°C) and continuous groundwater (up)flow at ~1ml/hr throughout the experiment. Simulated groundwater was prepared in laboratory containing sulfate, metals (Zn,Cd) and arsenic (AsV). While chemical and microbial parameters were followed regularly over time, solid phase has been

  6. Feasibility study for the remediation of groundwater contaminated by organolead compounds

    International Nuclear Information System (INIS)

    Andreottola, Gianni; Dallago, Loris; Ferrarese, Elisa

    2008-01-01

    The aim of this research was to assess the effectiveness of chemical oxidation, Advanced Oxidation Processes (AOPs) and adsorption on granular activated carbon (GAC) for the ex situ remediation of a groundwater contaminated by organolead compounds, including tetraethyl lead (TEL), triethyl lead (TREL) and diethyl lead (DEL). The groundwater of concern was collected from the site of a former tetraalkyllead producing company in Trento (Italy), and showed an average total organic lead (TOL) content about 95.1 μg/L (TEL 0.5 μg/L, TREL 86.4 μg/L, DEL 8.3 μg/L). The main target of the study was to find out which method was more effective in reducing the pollutant content. For this purpose, several laboratory tests were performed, including chemical oxidation tests with different reactants (hydrogen peroxide, modified Fenton's reagent, potassium permanganate, activated potassium persulfate, oxygen and combinations of potassium permanganate and modified Fenton's reagent), AOPs with ozone, UV radiation and hydrogen peroxide and filtration on granular activated carbon. A combination of chemical and physical treatments was also tested, with GAC filtration followed by chemical oxidation. According to the results achieved, the treatments which showed the best remediation performances were: chemical oxidation with modified Fenton's reagent, AOPs with hydrogen peroxide and ozone (perozone), AOPs with hydrogen peroxide and UV radiation, and the combined treatment with activated carbon filtration followed by chemical oxidation with perozone. All these treatments showed a 90% TOL removal, with excellent removals of both TEL and TREL, and final DEL concentrations below 5 μg/L

  7. Feasibility study for the remediation of groundwater contaminated by organolead compounds

    Energy Technology Data Exchange (ETDEWEB)

    Andreottola, Gianni; Dallago, Loris [Universita degli Studi di Trento, Dipartimento di Ingegneria Civile e Ambientale, Via Mesiano 77, 38050 Trento (Italy); Ferrarese, Elisa [Universita degli Studi di Trento, Dipartimento di Ingegneria Civile e Ambientale, Via Mesiano 77, 38050 Trento (Italy)], E-mail: elisa.ferrarese@ing.unitn.it

    2008-08-15

    The aim of this research was to assess the effectiveness of chemical oxidation, Advanced Oxidation Processes (AOPs) and adsorption on granular activated carbon (GAC) for the ex situ remediation of a groundwater contaminated by organolead compounds, including tetraethyl lead (TEL), triethyl lead (TREL) and diethyl lead (DEL). The groundwater of concern was collected from the site of a former tetraalkyllead producing company in Trento (Italy), and showed an average total organic lead (TOL) content about 95.1 {mu}g/L (TEL 0.5 {mu}g/L, TREL 86.4 {mu}g/L, DEL 8.3 {mu}g/L). The main target of the study was to find out which method was more effective in reducing the pollutant content. For this purpose, several laboratory tests were performed, including chemical oxidation tests with different reactants (hydrogen peroxide, modified Fenton's reagent, potassium permanganate, activated potassium persulfate, oxygen and combinations of potassium permanganate and modified Fenton's reagent), AOPs with ozone, UV radiation and hydrogen peroxide and filtration on granular activated carbon. A combination of chemical and physical treatments was also tested, with GAC filtration followed by chemical oxidation. According to the results achieved, the treatments which showed the best remediation performances were: chemical oxidation with modified Fenton's reagent, AOPs with hydrogen peroxide and ozone (perozone), AOPs with hydrogen peroxide and UV radiation, and the combined treatment with activated carbon filtration followed by chemical oxidation with perozone. All these treatments showed a 90% TOL removal, with excellent removals of both TEL and TREL, and final DEL concentrations below 5 {mu}g/L.

  8. Waste management and environmental compliance aspects of a major remedial action program

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.

    1991-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) is one of four major programs undertaken by the US Department of Energy (DOE) to remediate various sites where radiological contamination remained from programs conducted during the nation's early years of research and development in atomic energy. The remedial actions at the 33 sites that are currently in FUSRAP could generate an estimated total volume of about 1.6 million cubic meters of radioactive waste. Waste disposal is currently estimated to represent about one-third of the total estimated $2.1 billion cost for the entire program over its total duration. Waste management aspects within the program are diverse. The sites range in size from small areas used only for storage operations to large-scale decommissioned industrial facilities where uranium processing and other operations were carried out in the past. Currently, four sites are on the National Priorities List for remediation. Remedial actions at FUSRAP sites have to satisfy the requirements of both the National Environmental Policy Act and the Comprehensive Environmental Response, Compensation and Liability Act, as amended. In addition, a number of federal, state, and local laws as well as Executive Orders and DOE Orders may be applicable or relevant to each site. Several key issues currently face the program, including the mixed waste issue, both from the environmental compliance (with Resource Conservation and Recovery Act) and the disposal technology perspectives. 7 refs., 1 tab

  9. A critical review of ferrate(VI)-based remediation of soil and groundwater.

    Science.gov (United States)

    Rai, Prabhat Kumar; Lee, Jechan; Kailasa, Suresh Kumar; Kwon, Eilhann E; Tsang, Yiu Fai; Ok, Yong Sik; Kim, Ki-Hyun

    2018-01-01

    Over the past few decades, diverse chemicals and materials such as mono- and bimetallic nanoparticles, metal oxides, and zeolites have been used for soil and groundwater remediation. Ferrate (Fe VI O 4 2- ) has been widely employed due to its high-valent iron (VI) oxo compound with high oxidation/reduction potentials. Ferrate has received attention for wide environmental applications including water purification and sewage sludge treatment. Ferrate provides great potential for diverse environmental applications without any environmental problems. Therefore, this paper provides comprehensive information on the recent progress on the use of (Fe VI O 4 2- ) as a green material for use in sustainable treatment processes, especially for soil and water remediation. We reviewed diverse synthesis recipes for ferrates (Fe VI O 4 2- ) and their associated physicochemical properties as oxidants, coagulants, and disinfectants for the elimination of a diverse range of chemical and biological species from water/wastewater samples. A summary of the eco-sustainable performance of ferrate(VI) in water remediation is also provided and the future of ferrate(VI) is discussed in this review. Copyright © 2017 Elsevier Inc. All rights reserved.

  10. Remedial actions of nuclear safety shot sites: Double Tracks and Clean Slates

    International Nuclear Information System (INIS)

    Sanchez, M.; Shotton, M.; Lyons, C.

    1998-03-01

    Remedial actions of plutonium (Pu)-contaminated soils are in the preliminary stages of development at the Nevada Test Site (NTS). Interim clean-up actions were completed at the Double Tracks and Clean Slate 1 safety shot sites in 1996 and 1997, respectively. Soil at both sites, with a total transuranic activity greater than 20 picoCuries per gram (pCi/g), was excavated and shipped to the NTS for disposal. Characterization and assessment efforts were initiated at the Double Tracks site in 1995, and the clean-up of this site as an interim action was completed in 1996. Clean-up of this site consisted of taking site-specific data and applying rationale for dose and risk calculations in selecting parameter values for the interim corrective action level. The remediation process included excavating and stockpiling the contaminated soil and loading the soil into supersacks with approximately 1,513 cubic meters (53,500 cubic feet) being shipped to the NTS for disposal. In 1997, remediation began on the Clean Slate 1 site on which characterization had already been completed using a very similar approach; however, the site incorporated lessons learned, cost efficiencies, and significant improvements to the process. This paper focuses on those factors and the progress that has been made in cleaning up the sites. The application of a technically reasonable remediation method, as well as the cost factors that supported transport and disposal of the low-level waste in bulk are discussed

  11. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

  12. MULTI-OBJECTIVE OPTIMAL DESIGN OF GROUNDWATER REMEDIATION SYSTEMS: APPLICATION OF THE NICHED PARETO GENETIC ALGORITHM (NPGA). (R826614)

    Science.gov (United States)

    A multiobjective optimization algorithm is applied to a groundwater quality management problem involving remediation by pump-and-treat (PAT). The multiobjective optimization framework uses the niched Pareto genetic algorithm (NPGA) and is applied to simultaneously minimize the...

  13. Least-cost groundwater remediation design using uncertain hydrogeological information. 1998 annual progress report

    International Nuclear Information System (INIS)

    Pinder, G.F.

    1998-01-01

    'The objective of the project is to formulate, test, and evaluate a new approach to the least-cost design of groundwater contamination containment and decontamination systems. The proposed methodology employs robust optimization, the outer-approximation method of non-linear programming, and groundwater flow and transport modeling to find the most cost-effective pump-and-treat design possible given the physical parameters describing the groundwater reservoir are known with uncertainty. The result is a methodology that will provide the least-cost groundwater remediation design possible given a specified set of design objectives and physical and sociological constraints. As of the end of the first year of this 3-year project the author has developed and tested the concept of robust optimization within the framework of least-cost groundwater-contamination-containment design. The outer-approximation method has been employed in this context for the relatively simple linear-constraint case associated with the containment problem. In an effort to enhance the efficiency and applicability of this methodology, a new strategy for selecting the various realizations arising out of the Monte-Carlo underpinnings of the robust-optimization technique has been developed and tested. Based upon observations arising out of this work a yet more promising approach has been discovered. The theoretical foundation for this most recent approach has been, and continues to be, the primary focus of the research.'

  14. Public information experience in the uranium mill tailings remedial action (UMTRA) project

    International Nuclear Information System (INIS)

    Meyer, H.R.; Skinner, D.J.

    1986-01-01

    To enhance public perception of the UMTRA Project remedial actions at some 23 sites in the US, an information program has been designed to demonstrate the small risk associated with the work in each community. An unusual aspect of this information program has involved a specific effort to educate listeners concerning the Health Physics terminology being used. The information program has been successful in reducing the level of public anxiety associated with UMTRA remedial action at the first Project site, and is currently being applied at several new sites

  15. Current activities handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified

  16. Current activities handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-27

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified.

  17. Environmental assessment of remedial action at the inactive uraniferous lignite ashing sites at Belfield and Bowman, North Dakota

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 authorized the US Department of Energy (DOE) to perform remedial actions at Belfield and Bowman inactive lignite ashing sites in southwestern North Dakota to reduce the potential public health impacts from the residual radioactivity remaining at the sites. The US Environmental Protection Agency (EPA) promulgated standards (40 CFR 192) that contain measures to control the residual radioactive materials and other contaminated materials, and proposed standards to protect the groundwater from further degradation. Remedial action at the Belfield and Bowman sites must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The Belfield and Bowman designated sites were used by Union Carbide and Kerr-McGee, respectively, to process uraniferous lignite in the 1960s. Uranium-rich ash from rotary kiln processing of the lignite was loaded into rail cars and transported to uranium mills in Rifle, Colorado, and Ambrosia Lake, New Mexico, respectively. As a result of the ashing process, there is a total of 158,400 cubic yards (yd 3 ) [121,100 cubic meters (m 3 )] of radioactive ash-contaminated soils at the two sites. Windblown ash-contaminated soil covers an additional 21 acres (8.5 ha) around the site, which includes grazing land, wetlands, and a wooded habitat

  18. Long-Term Groundwater Monitoring Optimization, Clare Water Supply Superfund Site, Permeable Reactive Barrier and Soil Remedy Areas, Clare, Michigan

    Science.gov (United States)

    This report contains a review of the long-term groundwater monitoring network for the Permeable Reactive Barrier (PRB) and Soil Remedy Areas at the Clare Water Supply Superfund Site in Clare, Michigan.

  19. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1980-01-01

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses

  20. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-31

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses.

  1. Scientific Opportunity to Reduce Risk in Groundwater and Soil Remediation

    Energy Technology Data Exchange (ETDEWEB)

    Pierce, Eric M.; Freshley, Mark D.; Hubbard, Susan S.; Looney, Brian B.; Zachara, John M.; Liang, Liyuan; Lesmes, D.; Chamberlain, G. M.; Skubal, Karen L.; Adams, V.; Denham, Miles E.; Wellman, Dawn M.

    2009-08-25

    In this report, we start by examining previous efforts at linking science and DOE EM research with cleanup activities. Many of these efforts were initiated by creating science and technology roadmaps. A recurring feature of successfully implementing these roadmaps into EM applied research efforts and successful cleanup is the focus on integration. Such integration takes many forms, ranging from combining information generated by various scientific disciplines, to providing technical expertise to facilitate successful application of novel technology, to bringing the resources and creativity of many to address the common goal of moving EM cleanup forward. Successful projects identify and focus research efforts on addressing the problems and challenges that are causing “failure” in actual cleanup activities. In this way, basic and applied science resources are used strategically to address the particular unknowns that are barriers to cleanup. The brief descriptions of the Office of Science basic (Environmental Remediation Science Program [ERSP]) and EM’s applied (Groundwater and Soil Remediation Program) research programs in subsurface science provide context to the five “crosscutting” themes that have been developed in this strategic planning effort. To address these challenges and opportunities, a tiered systematic approach is proposed that leverages basic science investments with new applied research investments from the DOE Office of Engineering and Technology within the framework of the identified basic science and applied research crosscutting themes. These themes are evident in the initial portfolio of initiatives in the EM groundwater and soil cleanup multi-year program plan. As stated in a companion document for tank waste processing (Bredt et al. 2008), in addition to achieving its mission, DOE EM is experiencing a fundamental shift in philosophy from driving to closure to enabling the long-term needs of DOE and the nation.

  2. US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule

    International Nuclear Information System (INIS)

    1988-01-01

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project, as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs

  3. Development of a waste minimization plan for a Department of Energy remedial action program: Ideas for minimizing waste in remediation scenarios

    International Nuclear Information System (INIS)

    Hubbard, Linda M.; Galen, Glen R.

    1992-01-01

    Waste minimization has become an important consideration in the management of hazardous waste because of regulatory as well as cost considerations. Waste minimization techniques are often process specific or industry specific and generally are not applicable to site remediation activities. This paper will examine ways in which waste can be minimized in a remediation setting such as the U.S. Department of Energy's Formerly Utilized Sites Remedial Action Program, where the bulk of the waste produced results from remediating existing contamination, not from generating new waste. (author)

  4. Ground-Water Protection and Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Dresel, P.E.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the ground-water protection and monitoring program strategy for the Hanford Site in 1994. Two of the key elements of this strategy are to (1) protect the unconfined aquifer from further contamination, and (2) conduct a monitoring program to provide early warning when contamination of ground water does occur. The monitoring program at Hanford is designed to document the distribution and movement of existing ground-water contamination and provides a historical baseline for evaluating current and future risk from exposure to the contamination and for deciding on remedial action options.

  5. Ground-Water Protection and Monitoring Program

    International Nuclear Information System (INIS)

    Dresel, P.E.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the ground-water protection and monitoring program strategy for the Hanford Site in 1994. Two of the key elements of this strategy are to (1) protect the unconfined aquifer from further contamination, and (2) conduct a monitoring program to provide early warning when contamination of ground water does occur. The monitoring program at Hanford is designed to document the distribution and movement of existing ground-water contamination and provides a historical baseline for evaluating current and future risk from exposure to the contamination and for deciding on remedial action options

  6. Programmatic Environmental Report for remedial actions at UMTRA [Uranium Mill Tailings Remedial Action] Project vicinity properties

    International Nuclear Information System (INIS)

    1985-03-01

    This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs

  7. Natural Remediation at Savannah River Site

    International Nuclear Information System (INIS)

    Lewis, C. M.; Van Pelt, R.

    2002-01-01

    Natural remediation is a general term that includes any technology or strategy that takes advantage of natural processes to remediate a contaminated media to a condition that is protective of human health and the environment. Natural remediation techniques are often passive and minimally disruptive to the environment. They are generally implemented in conjunction with traditional remedial solutions for source control (i.e., capping, stabilization, removal, soil vapor extraction, etc.). Natural remediation techniques being employed at Savannah River Site (SRS) include enhanced bio-remediation, monitored natural attenuation, and phytoremediation. Enhanced bio-remediation involves making nutrients available and conditions favorable for microbial growth. With proper precautions and feeding, the naturally existing microbes flourish and consume the contaminants. Case studies of enhanced bio-remediation include surface soils contaminated with PCBs and pesticides, and Volatile Organic Compound (VOC) contamination in both the vadose zone and groundwater. Monitored natural attenuation (MNA) has been selected as the preferred alternative for groundwater clean up at several SRS waste units. Successful implementation of MNA has been based on demonstration that sources have been controlled, groundwater modeling that indicates that plumes will not expand or reach surface water discharge points at levels that exceed regulatory limits, and continued monitoring. Phytoremediation is being successfully utilized at several SRS waste units. Phytoremediation involves using plants and vegetation to uptake, break down, or manage contaminants in groundwater or soils. Case studies at SRS include managing groundwater plumes of tritium and VOCs with pine trees that are native to the area. Significant decreases in tritium discharge to a site stream have been realized in one phytoremediation project. Studies of other vegetation types, methods of application, and other target contaminants are

  8. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Rifle, Colorado

    International Nuclear Information System (INIS)

    1990-02-01

    This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Rifle sites. That remedial action consists of removing approximately 4,185,000 cubic yards (cy) of tailings and contaminated materials from their current locations, transporting, and stabilizing the tailings material at the Estes Gulch disposal site, approximately six miles north of Rifle. The tailings and contaminated materials are comprised of approximately 597,000 cy from Old Rifle, 3,232,000 cy from New Rifle, and 322,000 cy from vicinity properties and about 34,000 cy from demolition. The remedial action plan includes specific design requirements for the detailed design and construction of the remedial action. An extensive amount of data and supporting information have been generated for this remedial action and cannot all be incorporated into this document. Pertinent information and data are included with reference given to the supporting documents

  9. Progress Toward Cleanup of Operable Unit 1 Groundwater at the US DOE Mound, Ohio, Site: Success of a Phase-Combined Remedy – 15310

    Energy Technology Data Exchange (ETDEWEB)

    Hooten, Gwendolyn [U.S. Department of Energy, Harrison, OH (United States). Office of Legacy Management; Cato, Rebecca [Stoller Newport News Nuclear Inc., Weldon Spring, MS (United States); Looney, Brian [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Huntsman, Brent [Terran Corporation, Beavercreek, OH (United States)

    2015-03-01

    Operable Unit 1 (OU-1) soil and groundwater have been affected by volatile organic compounds (VOC) Present groundwater remedy is collection, treatment, and disposal (pump and treat [P&T]) Several combinations of technologies were used to address soil and groundwater contamination Monitored natural attenuation (MNA) is a viable alternative Majority of source term has been excavated VOC concentrations in groundwater have decreased Attenuation mechanisms have been observed in the subsurface at OU-1

  10. Simulation–optimization model for groundwater contamination ...

    Indian Academy of Sciences (India)

    used techniques for groundwater remediation in which the contaminated groundwater is pumped ... ing the affected groundwater aquifer down to some drinking water standard. Several .... For simplicity, rectangular support domain is used in this study. Figure 1 ..... For PAT remediation system, decision variables include the.

  11. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which describes the proposed remedial action for the Naturita site. An extensive amount of data and supporting information has been generated and evaluated for this remedial action. These data and supporting information are not incorporated into this single document but are included or referenced in the supporting documents. The RAP consists of this RAS and four supporting documents or attachments. This Attachment 2, Geology Report describes the details of geologic, geomorphic, and seismic conditions at the Dry Flats disposal site

  12. Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    1987-06-01

    During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs

  13. Subsurface Transport Behavior of Micro-Nano Bubbles and Potential Applications for Groundwater Remediation

    Directory of Open Access Journals (Sweden)

    Hengzhen Li

    2013-12-01

    Full Text Available Micro-nano bubbles (MNBs are tiny bubbles with diameters on the order of micrometers and nanometers, showing great potential in environmental remediation. However, the application is only in the beginning stages and remains to be intensively studied. In order to explore the possible use of MNBs in groundwater contaminant removal, this study focuses on the transport of MNBs in porous media and dissolution processes. The bubble diameter distribution was obtained under different conditions by a laser particle analyzer. The permeability of MNB water through sand was compared with that of air-free water. Moreover, the mass transfer features of dissolved oxygen in water with MNBs were studied. The results show that the bubble diameter distribution is influenced by the surfactant concentration in the water. The existence of MNBs in pore water has no impact on the hydraulic conductivity of sand. Furthermore, the dissolved oxygen (DO in water is greatly increased by the MNBs, which will predictably improve the aerobic bioremediation of groundwater. The results are meaningful and instructive in the further study of MNB research and applications in groundwater bioremediation.

  14. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  15. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    International Nuclear Information System (INIS)

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado

  16. Proceedings of the remediation technologies symposium 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This conference provided a forum to discuss the remediation of contaminated sites. It was attended by all industry sectors that have an interest in learning about technical issues in environmental remediation research and the latest innovations in soil and groundwater remediation and industrial pollutant treatments. Cost effective in-situ and ex-situ soil reclamation strategies were presented along with groundwater and surface water remediation strategies. The diversified sessions at this conference were entitled: regulatory update; Montreal Centre of Excellence in Brownfields Rehabilitation; soil and groundwater remediation through the Program of Energy Research and Development at Environment Canada; technology from the Netherlands; bioremediation; hydrocarbons; in-situ remediation; phytoremediation; salt management; unique locations; and, miscellaneous issues. Some areas and case studies covered in the presentations included: biological and non-biological treatments; thermal desorption; encapsulation; natural attenuation; multi-phase extraction; electrochemical remediation; and membrane technology. The conference featured 63 presentations, of which 23 have been catalogued separately for inclusion in this database. tabs., figs.

  17. Proceedings of the remediation technologies symposium 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This conference provided a forum to discuss the remediation of contaminated sites. It was attended by all industry sectors that have an interest in learning about technical issues in environmental remediation research and the latest innovations in soil and groundwater remediation and industrial pollutant treatments. Cost effective in-situ and ex-situ soil reclamation strategies were presented along with groundwater and surface water remediation strategies. The diversified sessions at this conference were entitled: regulatory update; Montreal Centre of Excellence in Brownfields Rehabilitation; soil and groundwater remediation through the Program of Energy Research and Development at Environment Canada; technology from the Netherlands; bioremediation; hydrocarbons; in-situ remediation; phytoremediation; salt management; unique locations; and, miscellaneous issues. Some areas and case studies covered in the presentations included: biological and non-biological treatments; thermal desorption; encapsulation; natural attenuation; multi-phase extraction; electrochemical remediation; and membrane technology. The conference featured 63 presentations, of which 23 have been catalogued separately for inclusion in this database. tabs., figs

  18. Remedial Action Report for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2007-08-15

    This Phase III remedial action report addresses the remediation of lead-contaminated soils found at the Security Training Facility STF-02 Gun Range at the Idaho National Laboratory Site. Phase I, consisting of developing and implementing institutional controls at Operble Unit 10-04 sites and developing and implementing Idaho National Laboratory Site-wide plans for both institutional controls and ecological monitoring, was addressed in a previous report. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase IV will remediate hazards from unexploded ordnance.

  19. Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS)

  20. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  1. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  2. Application of Biostimulation for Remediation of Sulfate-Contaminated Groundwater at a Mining Site

    Science.gov (United States)

    Miao, Z.; Carroll, K. C.; Carreon, C.; Brusseau, M. L.

    2011-12-01

    There is growing concern regarding sulfate contamination of groundwater. One innovative in-situ remediation option under investigation is biostimulation through addition of electron-donor amendments to enhance sulfate reduction. Two pilot-scale ethanol-injection tests were conducted at a former uranium mining site that is contaminated with sulfate and nitrate (with a lack of heavy metals), and for which there appears to be minimal natural attenuation of sulfate. The first test was a push-pull test that had a limited zone of influence, while the second test was a single-well injection test in which additional downgradient wells were monitored. For both tests, sulfate concentrations began to decline within a few weeks of injection, after nitrate concentrations were significantly reduced. Concomitantly, aqueous concentrations of manganese, iron, and hydrogen sulfide increased from background. Monitoring over many months revealed that the declines in sulfate concentration conformed to exponential decay, with first-order decay rates of approximately 0.01 /d. Analysis of sulfur stable isotope data indicated that the decrease in sulfate concentrations was microbially mediated. The results also indicated that sulfides formed during sulfate reduction may have undergone partial re-oxidation. This study illustrates the feasibility of using ethanol injection for remediation of sulfate-contaminated groundwater. However, re-oxidation of sulfides (both metal sulfide precipitates and hydrogen sulfide gas) is a potential issue of significance that would need to be addressed.

  3. Uranium Mill Tailings Remedial Action Project: technical approach document

    International Nuclear Information System (INIS)

    1986-05-01

    The Uranium Mill Tailings Radiation Control Act of 1978, PL95-604, grants the Secretary of Energy authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards from inactive uranium mill sites. These cleanup actions are to be performed in compliance with the EPA standards (40 CFR Part 192) which became final on March 7, 1983. This document describes the general technical approaches and design criteria that are adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPA standards

  4. The Department of Energy's Remedial Action Assessment System (RAAS): Decision support tools for performing streamlined feasibility studies

    International Nuclear Information System (INIS)

    White, M.K.

    1994-06-01

    The United States Department of Energy (DOE) faces the major task of cleaning up hundreds of waste sites across the nation, which will require completion of a large number of remedial investigation/feasibility studies (RI/FSs). The intent of each RI/FS is to characterize the waste problems and environmental conditions at the operable unit level, segment the remediation problem into manageable medium-specific and contaminant-specific pieces, define corresponding remediation objectives, and identify remedial response actions to satisfy those objectives. The RI/FS team can then identify combinations of remediation technologies that will meet the remediation objectives. Finally, the team must evaluate these remedial alternatives in terms of effectiveness, implementability, cost, and acceptability. The Remedial Action Assessment System (RAAS) is being developed by Pacific Northwest Laboratory (PNL) to support DOE in this effort

  5. Results of the independent verification of radiological remedial action at 496 South Main Street, Monticello, Utah (MS00050)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-12-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1984, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 496 South Main Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  6. Results of the independent verification of radiological remedial action at 416 South Main Street, Monticello, Utah (MS00150)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Wilson, M.J.

    1990-02-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1984 and 1985, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 416 South Main Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  7. Results of the independent verification of radiological remedial action at 480 South Main Street, Monticello, Utah (MS00049)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-05-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that has been contaminated by radioactive material resulting from mill operations. During 1984 and 1985, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 480 South Main Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  8. A technical approach to groundwater contamination problems

    International Nuclear Information System (INIS)

    Burton, J.C.; Leser, C.; Rose, C.M.

    1993-01-01

    Argonne National Laboratory has been performing technical investigations at sites in Nebraska and Kansas that have identified groundwater contamination by carbon tetrachloride. This comprehensive program will ultimately provide the affected communities with safe drinking water. The first step in the program is to evaluate the available data and identify sites that will require an Alternate Water Supply Study (AWSS). The objective of the AWSS is to identify options for providing a safe drinking water supply to all users, in compliance with the Safe Drinking Water Act. The AWSS consists of an engineering and cost evaluation followed by implementation of the selected alternative. For sites with contamination less than a specific concentration, the AWSS is regarded as a satisfactory long term solution, and no further action is taken. For those sites with concentrations above that specific limit, the AWSS implementation is regarded as only a stopgap measure, and the site is selected for additional remedial action. The first step of the remedial action is an Expedited Site Characterization (ESC). The ESC was developed at Argonne to decrease the cost and time of the remedial investigation and feasibility study while producing a high-quality technical investigation. The ESC is designed to characterize the contaminant plume configuration and movement, which requires an understanding of the geological and hydrogeologic controls on groundwater movement as well as the nature and extent of any remaining carbon tetrachloride source in the soils. The ESC program uses a multidisciplinary technical approach that incorporates geology, geochemistry, geohydrology, and geophysics. Field activities include sampling, chemical analysis, and borehole and surface geophysical surveys

  9. Progress report on the Grand Junction uranium mill tailings remedial action program

    International Nuclear Information System (INIS)

    1979-02-01

    The report provides a history of the program, an analysis of the current status of the program, problems encountered and measures being taken to solve them, and a forecast of future effort required. From the start of remedial efforts in 1973 through September 30, 1978, remedial action has been done on 325 individual structures, including 289 private residences, 14 schools, and 22 commercial business/church locations. As recently as one year ago, the total number of structures requiring remedial action was estimated to be about 600. However, continuing measurements of radon daughter concentrations in structures which previously showed only slightly elevated gamma radiation have resulted in identificaion of additional structures exceeding the Surgeon General's guidelines for radon daughters. Because radon daughter concentrations in structures are highly variable depending on the season of the year and the level of activity, annual averages are used for determining eligibility under the guidelines. Based on this recent experience the estimate of the total number of structures which will eventually qualify for remedial action has been increased from 600 to 800, and the estimated total program cost has been increased from $12,670,000 to $16,960,000. It must be emphasized that these estimates are based only on experience ratios of past measurements and are highly uncertain. It is not expected that further funding, if necessary, will be required before fiscal year 1982

  10. Investors Perception on Civil Remedies and Civil Action under the Capital Markets and Services Act 2007

    OpenAIRE

    Yeon, Asmah Laili; Yaacob, Nurli

    2016-01-01

    The Capital Markets and Services Act 2007 provides civil action and remedies for the victim of securities crimes. Whether these remedies are sufficient to protect investors’ interest when dealing in securities transaction is an issue to be discussed in the paper? This paper aims to analyze investors’ perception on civil remedies and action. This paper based on the legal research findings where a systematic method of exploring, investigating, analyzing and conceptualizing legal issues pertaini...

  11. GASReP/DESRT: Proceedings [of the] 2nd annual symposium on groundwater and soil remediation. Comptes rendus [de la] 2e symposium annuel sur la restauration des eaux souterraines et des sois contamines

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    A conference was held to discuss ground water and soil remediation with emphasis on the Canadian national Groundwater and Soil Remediation Program (GASReP) and the Development and Demonstration of Site Remediation Technology (DESRT) program. Papers were presented on the subjects of groundwater and soil remediation research projects, bioremediation, excavation and treatment, pumping and treatment/soil venting, and industry and government initiatives. Separate abstracts have been prepared for 15 papers from the conference.

  12. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado

    International Nuclear Information System (INIS)

    1994-04-01

    This report evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells to determine the potential for immediate human health and environmental impacts. This risk assessment evaluates the most contaminated groundwater that flows beneath the processing site towards the Gunnison River. The monitor wells that have consistently shown the highest concentration of most contaminants are used in this risk assessment. This risk assessment will be used in conjunction with additional activities and documents to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium

  13. GROUDWATER REMEDIATION AT THE 100-HR-3 OPERABLE UNIT HANFORD, SITE WASHINGTON, USA - 11507

    International Nuclear Information System (INIS)

    Smoot, J.L.; Biebesheimer, F.H.; Eluskie, J.A.; Spiliotopoulos, A.; Tonkin, M.J.; Simpkin, T.

    2011-01-01

    The 100-HR-3 Groundwater Operable Unit (OU) at the Hanford Site underlies three former plutonium production reactors and the associated infrastructure at the 100-D and 100-H Areas. The primary contaminant of concern at the site is hexavalent chromium; the secondary contaminants are strontium-90, technetium-99, tritium, uranium, and nitrate. The hexavalent chromium plume is the largest plume of its type in the state of Washington, covering an area of approximately 7 km 2 (2.7 mi 2 ) with concentrations greater than 20 (micro)g/L. Concentrations range from 60,000 (micro)g/L near the former dichromate transfer station in the 100-D Area to large areas of 20 to 100 (micro)g/L across much of the plume area. Pump-and-treat operations began in 1997 and continued into 2010 at a limited scale of approximately 200 gal/min. Remediation of groundwater has been fairly successful in reaching remedial action objectives (RAOs) of 20 (micro)g/L over a limited region at the 100-H, but less effective at 100-D. In 2000, an in situ, permeable reactive barrier was installed downgradient of the hotspot in 100-D as a second remedy. The RAOs are still being exceeded over a large portion of the area. The CH2M HILL Plateau Remediation Company was awarded the remediation contract for groundwater in 2008 and initiated a remedial process optimization study consisting of modeling and technical studies intended to enhance the remediation. As a result of the study, 1,400 gal/min of expanded treatment capacity are being implemented. These new systems are designed to meet 2012 and 2020 target milestones for protection of the Columbia River and cleanup of the groundwater plumes.

  14. Framework for a Risk-Informed Groundwater Compliance Strategy for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nye County, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Marutzky, Sam

    2010-09-01

    Note: This document was prepared before the NTS was renamed the Nevada National Security Site (August 23, 2010); thus, all references to the site herein remain NTS. Corrective Action Unit (CAU) 98, Frenchman Flat, at the Nevada Test Site (NTS) was the location of ten underground nuclear tests between 1965 and 1971. As a result, radionuclides were released in the subsurface in the vicinity of the test cavities. Corrective Action Unit 98 and other CAUs at the NTS and offsite locations are being investigated. The Frenchman Flat CAU is one of five Underground Test Area (UGTA) CAUs at the NTS that are being evaluated as potential sources of local or regional impact to groundwater resources. For UGTA sites, including Frenchman Flat, contamination in and around the test cavities will not be remediated because it is technologically infeasible due to the depth of the test cavities (150 to 2,000 feet [ft] below ground surface) and the volume of contaminated groundwater at widely dispersed locations on the NTS. Instead, the compliance strategy for these sites is to model contaminant flow and transport, estimate the maximum spatial extent and volume of contaminated groundwater (over a period of 1,000 years), maintain institutional controls, and restrict access to potentially contaminated groundwater at areas where contaminants could migrate beyond the NTS boundaries.

  15. Remedial action programs annual meeting: Meeting notes

    International Nuclear Information System (INIS)

    1987-01-01

    The US Department of Energy Grand Junction Projects Office was pleased to host the 1987 Remedial Action programs Annual Meeting and herein presents notes from that meeting as prepared (on relatively short notice) by participants. These notes are a summary of the information derived from the workshops, case studies, and ad hoc committee reports rather than formal proceedings. The order of the materials in this report follows the actual sequence of presentations during the annual meeting

  16. LCA of Soil and Groundwater Remediation

    DEFF Research Database (Denmark)

    Søndergaard, Gitte Lemming; Owsianiak, Mikolaj

    2018-01-01

    Today, there is increasing interest in applying LCA to support decision-makers in contaminated site management. In this chapter, we introduce remediation technologies and associated environmental impacts, present an overview of literature findings on LCA applied to remediation technologies...... and present methodological issues to consider when conducting LCAs within the area. Within the field of contaminated site remediation , a terminology distinguishing three types of environmental impacts: primary, secondary and tertiary, is often applied. Primary impacts are the site-related impacts due...... and efficiency of remediation, which are important for assessment or primary impacts; (ii) robust assessment of primary impacts using site-specific fate and exposure models; (iii) weighting of primary and secondary (or tertiary) impacts to evaluate trade-offs between life cycle impacts from remediation...

  17. The nanotoxicology of a newly developed zero-valent iron nanomaterial for groundwater remediation and its remediation efficiency assessment combined with in vitro bioassays for detection of dioxin-like environmental pollutants

    OpenAIRE

    Schiwy, Andreas Herbert

    2016-01-01

    The assessment of chemicals and new compounds is an important task of ecotoxicology. In this thesis a newly developed zero-valent iron material for nanoremediation of groundwater contaminations was investigated and in vitro bioassays for high throughput screening were developed. These two elements of the thesis were combined to assess the remediation efficiency of the nanomaterial on the groundwater contaminant acridine. The developed in vitro bioassays were evaluated for quantification of th...

  18. Middlesex Sampling Plant environmental report for calendar year 1992, 239 Mountain Avenue, Middlesex, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Middlesex Sampling Plant (MSP) and provides the results for 1992. The site, in the Borough of Middlesex, New Jersey, is a fenced area and includes four buildings and two storage piles that contain 50,800 m{sup 3} of radioactive and mixed hazardous waste. More than 70 percent of the MSP site is paved with asphalt. The MSP facility was established in 1943 by the Manhattan Engineer District (MED) to sample, store, and/or ship uranium, thorium, and beryllium ores. In 1955 the Atomic Energy Commission (AEC), successor to MED, terminated the operation and later used the site for storage and limited sampling of thorium residues. In 1967 AEC activities ceased, onsite structures were decontaminated, and the site was certified for unrestricted use under criteria applicable at that time. In 1980 the US Department of Energy (DOE) initiated a multiphase remedial action project to clean up several vicinity properties onto which contamination from the plant had migrated. Material from these properties was consolidated into the storage piles onsite. Environmental surveillance of MSP began in 1980 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program. The environmental surveillance program at MSP includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-230, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analyses are performed to detect metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling th DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses.

  19. Coordination of groundwater activities in the 100 N Area

    International Nuclear Information System (INIS)

    Hartman, M.J.

    1995-09-01

    The initiation of the N Springs Expedited Response Action (ERA) in the 100 N Area will affect the groundwater monitoring networks of two Resource Conservation and Recovery Act of 1976 (RCRA) units. The 1301-N and 325-N facilities are treatment, storage, or disposal (TSD) units that have been monitored under RCRA since 1987. In September 1994, the Washington State Department of Ecology issued an action memorandum, instructing the US Department of Energy (DOE) to take the action. The planned pump-and-treat system will preclude meeting the specific objectives of interim-status RCRA groundwater monitoring representative samples and detect adverse impacts of the TSD units on. However, under RCRA final-status requirements, which will be implemented in 1999, corrective action for groundwater contamination will probably be required. The US Environmental Protection Agency (EPA) has declared parity between RCRA corrective action and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 remedial action decisions. The 1301-N and 1325-N facilities are still in interim-status and therefore are not in the category of ''RCRA corrective action.'' However, DOE's position is that parity exists between RCRA and the ERA because RCRA corrective action will almost certainly be required in the future

  20. Radiological guidelines for application to DOE's Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1983-03-01

    The US Department of Energy has implemented a program to evaluate and, where necessary, take action to protect the public from contamination at sites that were used in the past to process and/or store radioactive materials for the former US Army Corps of Engineers Manhattan Engineer District or the US Atomic Energy Commission. The program is identified as the Formerly Utilized Sites Remedial Action Program (FUSRAP). This document describes methods considered appropriate for the evaluation of health effects that might possible be caused by radioactive contamination at FUSRAP sites. This assessment methodology is applied to a typical site for the purposeof deriving guidelines for the cleanup of contaminated soil. Additional guidance is provided for planning site-specific remedial action that is consistent with the overall objectives of FUSRAP

  1. Dynamic optimal control of groundwater remediation with management periods: Linearized and quasi-Newton approaches

    International Nuclear Information System (INIS)

    Culver, T.B.

    1991-01-01

    Several modifications of the linear-quadratic regulator (LQR) optimization algorithm are developed, and the computational efficiency of each algorithm with respect to groundwater remediation is evaluated. In each case, the optimization model is combined with a finite element groundwater flow and transport simulation model to determine the optimal time-varying pump-and-treat policy. The first modification of the LQR algorithm incorporated management periods, which are groups of simulation time steps during which the pumping policy remains constant. Management periods reduced the total computational demand, as measured by the CPU time, by as much as 85% compared to the time needed for the LQR solution without management periods. Complexity analysis revealed that computational savings of equal or greater magnitude can be expected in general for groundwater remediation applications and for many other applications of dynamic control. The LQR algorithm with management periods was further modified by assuming steady-state hydraulics within a management period (SSLQR), which simplifies the derivatives of the transition equation. A quasi-Newton differential dynamic programming (QNDDP) was formulated by approximating the complicated second derivatives of the transition equation using a Broyden rank-one approximation. QNDDP converged to the optimal policy for the test problem significantly faster than the LQR algorithm, requiring approximately half the computational time. With the test problem expanded to include the capacity of the treatment facility as a state variable, QNDDP with management periods can determine the optimal treatment facility capacity. With many management periods, the addition of the capital costs of the treatment facility changed the optimal policy so that the required treatment facility capacity was reduced

  2. Natural bioventing remediation from tidal wave action at a field site

    International Nuclear Information System (INIS)

    Kampbell, D.H.; Kittel, J.A.

    1996-01-01

    A remediation research study has been implemented at a jet fuel spill site on an island airport. A buried pipeline fracture several years ago resulted in a fuel spill exceeding 160,000 gallons. The site hydrogeology is a fragmented coral matrix with fresh water overlying more dense salt water. Water table fluctuations of about two feet occur once every twelve hours from tidal action. The research approach being pursued is to recover free-phase floating petroleum liquid using vacuum-mediated subsurface skimming wells. The vacuum will create an active vadose zone aeration to enhance aerobic biodegradation processes and vaporization of fuel. Once the floating fuel is removed, a natural bioventing action caused by tidal oscillations will complete remediation of the spill site

  3. Integrated remediation of soil and groundwater

    International Nuclear Information System (INIS)

    Dykes, R.S.; Howles, A.C.

    1992-01-01

    Remediation of sites contaminated with petroleum hydrocarbons and other organic chemicals frequently focuses on a single phase of the chemical in question. This paper describes an integrated approach to remediation involving selection of complimentary technologies designed to create a remedial system which achieves cleanup goals in affected media in the shortest possible time consistent with overall environmental protection

  4. Evaluation of contaminated groundwater cleanup objectives

    International Nuclear Information System (INIS)

    Arquiett, C.; Gerke, M.; Datskou, I.

    1996-01-01

    The US Department of Energy's (DOE's) Environmental Restoration Program will be responsible for remediating the approximately 230 contaminated groundwater sites across the DOE Complex. A major concern for remediation is choosing the appropriate cleanup objective. The cleanup objective chosen will influence the risk to the nearby public during and after remediation; risk to remedial and non-involved workers during remediation; and the cost of remediation. This paper discusses the trends shown in analyses currently being performed at Oak Ridge National Laboratories' (ORNL's) Center for Risk Management (CRM). To evaluate these trends, CRM is developing a database of contaminated sites. This paper examines several contaminated groundwater sites selected for assessment from CRM's data base. The sites in this sample represent potential types of contaminated groundwater sites commonly found at an installation within DOE. The baseline risk from these sites to various receptors is presented. Residual risk and risk during remediation is reported for different cleanup objectives. The cost associated with remediating to each of these objectives is also estimated for each of the representative sites. Finally, the general trends of impacts as a function of cleanup objective will be summarized. The sites examined include the Savannah River site, where there was substantial ground pollution from radionuclides, oil, coal stockpiles, and other forms of groundwater contamination. The effects of various types of groundwater contamination on various types of future user is described. 4 refs., 3 figs., 2 tabs

  5. Remedial Action and Waste Disposal Project Manager's Implementing Instructions

    International Nuclear Information System (INIS)

    Dronen, V.R.

    1998-01-01

    These Project Manager's Implementing Instructions provide the performance standards required of all Environmental Restoration Contractor personnel in their work during operation and administration of the Remedial Action and Waste Disposal Project. The instructions emphasize technical competency, workplace discipline, and personal accountability to ensure a high level of safety and performance during operations activities

  6. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA

  7. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  8. Unintentional contaminant transfer from groundwater to the vadose zone during source zone remediation of volatile organic compounds.

    Science.gov (United States)

    Chong, Andrea D; Mayer, K Ulrich

    2017-09-01

    Historical heavy use of chlorinated solvents in conjunction with improper disposal practices and accidental releases has resulted in widespread contamination of soils and groundwater in North America and worldwide. As a result, remediation of chlorinated solvents is required at many sites. For source zone treatment, common remediation strategies include in-situ chemical oxidation (ISCO) using potassium or sodium permanganate, and the enhancement of biodegradation by primary substrate addition. It is well known that these remediation methods tend to generate gas (carbon dioxide (CO 2 ) in the case of ISCO using permanganate, CO 2 and methane (CH 4 ) in the case of bioremediation). Vigorous gas generation in the presence of chlorinated solvents, which are categorized as volatile organic contaminants (VOCs), may cause gas exsolution, ebullition and stripping of the contaminants from the treatment zone. This process may lead to unintentional 'compartment transfer', whereby VOCs are transported away from the contaminated zone into overlying clean sediments and into the vadose zone. To this extent, benchtop column experiments were conducted to quantify the effect of gas generation during remediation of the common chlorinated solvent trichloroethylene (TCE/C 2 Cl 3 H). Both ISCO and enhanced bioremediation were considered as treatment methods. Results show that gas exsolution and ebullition occurs for both remediation technologies. Facilitated by ebullition, TCE was transported from the source zone into overlying clean groundwater and was subsequently released into the column headspace. For the case of enhanced bioremediation, the intermediate degradation product vinyl chloride (VC) was also stripped from the treatment zone. The concentrations measured in the headspace of the columns (TCE ∼300ppm in the ISCO column, TCE ∼500ppm and VC ∼1380ppm in the bioremediation column) indicate that substantial transfer of VOCs to the vadose zone is possible. These findings

  9. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service.

  10. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service

  11. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  12. Results of the independent verification of radiological remedial action at EG ampersand G Area 6, Monticello, Utah (MS00136)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-12-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1986, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at EG ampersand G Area 6, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  13. Results of the independent verification of radiological remedial action at 87 East 500 South Street, Monticello, Utah (MS00153)

    International Nuclear Information System (INIS)

    Wilson, M.J.; Crutcher, J.W.

    1991-07-01

    In 1980 the iste of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1987 and 1988, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 87 East 500 South Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  14. Emergency planning. Can the cost of remedial actions be compared to the value of the health effects they save

    International Nuclear Information System (INIS)

    Frittelli, L.; Tamburrano, A.

    1981-01-01

    When an accidental release of radioactive material occurs the exposure of the people concerned can be reduced only by remedial actions, applied to individuals (evacuation) or their environment (e.g. by land interdiction, by impoundment of contaminated products). The adoption of remedial actions should be based on a balance between the damage they cause and the reduction in health effects they can achieve. In this paper a 'cost-effectiveness' analysis is attempted by comparing the costs of remedial actions with the monetary value of the collective dose avoided by them. Remedial actions are undertaken to prevent non-stochastic effects in the exposed population and to limit stochastic effects therein. The damage caused by the remedial actions is evaluated by taking into account the loss of value of interdicted property, the costs for decontaminating land and structures, the loss of income of evacuated people. The options in remedial actions (interdiction, decontamination, goods removal) which minimize the total costs are supposed to be adopted at every location. The collective effective dose equivalent avoided by the remedial actions is computed by taking into account the external exposure from the cloud and from the contaminated ground, and the internal exposure from material inhaled from the passing cloud or inhaled from matter resuspended after deposition on the ground. The extent of the resulting total damage (both economic and health aspects) is partly determined by the intervention level chosen for defining the time and space features of remedial actions. As a result, the total damage has a lower value for an intervention level of about 0.1 Sv for large and medium releases from a nuclear power plant in a not very highly developed site. For a contained release no value of the intervention level optimizes the balance between health and economic consequences. (author)

  15. Hazardous Waste Remedial Actions Program annual progress report, FY 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    The Hazardous Waste Remedial Actions Programs (HAZWRAP), a unit of Martin Marietta Energy Systems, Inc., supports the Department of Energy (DOE) Oak Ridge Operations Office in broadly environmental areas, especially those relating to waste management and environmental restoration. HAZWRAP comprises six program areas, which are supported by central administrative and technical organizations. Existing programs deal with airborne hazardous substances, pollution prevention, remedial actions planning, environmental restoration, technology development, and information and data systems. HAZWRAP's mission to develop, promote, and apply-cost-effective hazardous waste management and environmental technologies to help solve national problems and concerns. HAZWRAP seeks to serve as integrator for hazardous waste and materials management across the federal government. It applies the unique combination of research and development (R D) capabilities, technologies, management expertise, and facilities in the Energy Systems complex to address problems of national importance. 24 figs., 10 tabs.

  16. An integrated approach to risk-based remediation of a former bulk fuel storage facility adjacent a marine environment

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, L.; Hers, I. [Golder Associates Ltd., Vancouver, BC (Canada)

    2006-07-01

    An integrated approach to risk-based remediation of a former bulk fuel storage facility adjacent to a marine environment was discussed. The presentation provided an introduction and illustration to the site location and history, located close to Skagway, Alaska and northwestern British Columbia. The site investigation and conceptual model were also presented. The remedial approach was also described with reference to a risk-based action approach, remedial objectives, soil vapour extraction (SVE)-bioventing, and air sparging-biosparging. The objectives were to minimize potential exposure to aquatic receptors by minimizing non-aqueous phase liquids (NAPL) mobility and dissolved transport of petroleum hydrocarbons. Groundwater modeling to assess the attenuation rate and to determine remedial targets was also discussed. Model validation and results of groundwater modeling as well as remediation system details and performance were then provided. It was determined that significant attenuation is occurring and that effective mass removal and concentrations have been decreasing over time. It was demonstrated that risk-based remedial goals and hydrogeology can change with land use/development. tabs., figs.

  17. Data base management for the Remedial Action Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Voorhees, L.D.; Cushman, R.M.; Faulkner, M.A.; Horwedel, B.M.

    1986-08-01

    The Oak Ridge National Laboratory's (ORNL's) Remedial Action Program was established to provide appropriate corrective measures at over 140 sites that were contaminated with radioactive and/or hazardous chemical wastes. To achieve this goal, numerous and varied studies are being conducted which will result in the collection of an unprecedented amount of data for the ORNL site. To manage such data effectively and efficiently, a computerized data base is being developed. The data base provides a unified repository for all data generated within the Remedial Action Program, to allow for necessary storage, manipulation, analyses, assessment, display, and report generation. Data base management for the Remedial Action Program is documented in this report by: (1) defining the organization of the data management staff and the services provided; (2) describing the design of the data base, including its management system, organization, and applications; (3) providing examples of the current and anticipated tasks; and (4) discussing quality assurance measures implemented to control the accuracy of the data entries and the security of the data

  18. A new risk and stochastic analysis of monitoring and remediation in subsurface contamination

    Science.gov (United States)

    Papapetridis, K.; Paleologos, E.

    2012-04-01

    Sanitary landfills constitute the most widely used management approach for the disposal of solid wastes because of their simplicity and cost effectiveness. However, historical records indicate that landfills exhibit a high failure rate of groundwater contamination. Successful detection of aquifer contamination via monitoring wells is a complicated problem with many factors, such as the heterogeneity of the geologic environment, the dispersion of contamination into the geologic medium, the quantity and nature of the contaminants, the number and location of the monitoring wells, and the frequency of sampling, all contributing to the uncertainty of early detection. Detection of contaminants, of course, is of value if remedial actions follow as soon as possible, so that the volume of contaminated groundwater to be treated is minimized. Practically, there is always a time lag between contaminant detection and remedial action response. Administrative decisions and arrangements with local contractors initiate remedial procedures introduces a time lag between detection and remediation time. During this time lag a plume continues to move into an aquifer contaminating larger groundwater volumes. In the present study these issues are addressed by investigating the case of instantaneous leakage from a landfill facility into a heterogeneous aquifer. The stochastic Monte Carlo framework was used to address, in two dimensions, the problem of evaluating the effectiveness of contaminant detection in heterogeneous aquifers by linear networks of monitoring wells. Numerical experiments based on the random-walk tracking-particle method were conducted to determine the detection probabilities and to calculate contaminated areas at different time steps. Several cases were studied assuming different levels of geologic heterogeneity, contamination dispersion, detectable contamination limits and monitoring wells' sampling frequencies. A new perspective is introduced for the correction of

  19. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This report evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells to determine the potential for immediate human health and environmental impacts. This risk assessment evaluates the most contaminated groundwater that flows beneath the processing site towards the Gunnison River. The monitor wells that have consistently shown the highest concentration of most contaminants are used in this risk assessment. This risk assessment will be used in conjunction with additional activities and documents to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium.

  20. Selection of monitoring times to assess remediation performance

    Energy Technology Data Exchange (ETDEWEB)

    Kueper, B.H.; Mundle, K. [Queen' s Univ., Kingston, ON (Canada). Dept. of Civil Engineering, Geoengineering Centre

    2007-07-01

    Several factors determine the time needed for a plume to respond to non-aqueous phase liquid (NAPL) source zone remediation. Most spills of NAPLs (fuels, chlorinated solvents, PCB oils, creosote and coal tar) require mass removal in order to implement remediation technologies such as chemical oxidation, thermal treatments, alcohol flushing, surfactant flushing and hydraulic displacement. While much attention has been given to the development of these remediation technologies, little attention has been given to the response of the plume downstream of the treatment zone and selection of an appropriate monitoring time scale to adequately evaluate the impacts of remediation. For that reason, this study focused on the prevalence of diffusive sinks, the mobility of the contaminant and the hydraulic conductivity of subsurface materials. Typically, plumes in subsurface environments dominated by diffusive sinks or low permeability materials need long periods of time to detach after source removal. This paper presented generic plume response model simulations that illustrated concentration rebound following the use of in-situ chemical oxidation in fractured clay containing trichloroethylene. It was determined that approximately 2 years are needed to reach peak rebound concentration after cessation remedial action. It was concluded that downgradient monitoring well concentrations may be greatly reduced during remedial action due to the fact that oxidant occupies the fracture and because oxidant diffuses into the clay matrix, creating a short period of contaminant reduction in the area of flowing groundwater. 9 refs., 2 tabs., 7 figs.

  1. Selection of monitoring times to assess remediation performance

    International Nuclear Information System (INIS)

    Kueper, B.H.; Mundle, K.

    2007-01-01

    Several factors determine the time needed for a plume to respond to non-aqueous phase liquid (NAPL) source zone remediation. Most spills of NAPLs (fuels, chlorinated solvents, PCB oils, creosote and coal tar) require mass removal in order to implement remediation technologies such as chemical oxidation, thermal treatments, alcohol flushing, surfactant flushing and hydraulic displacement. While much attention has been given to the development of these remediation technologies, little attention has been given to the response of the plume downstream of the treatment zone and selection of an appropriate monitoring time scale to adequately evaluate the impacts of remediation. For that reason, this study focused on the prevalence of diffusive sinks, the mobility of the contaminant and the hydraulic conductivity of subsurface materials. Typically, plumes in subsurface environments dominated by diffusive sinks or low permeability materials need long periods of time to detach after source removal. This paper presented generic plume response model simulations that illustrated concentration rebound following the use of in-situ chemical oxidation in fractured clay containing trichloroethylene. It was determined that approximately 2 years are needed to reach peak rebound concentration after cessation remedial action. It was concluded that downgradient monitoring well concentrations may be greatly reduced during remedial action due to the fact that oxidant occupies the fracture and because oxidant diffuses into the clay matrix, creating a short period of contaminant reduction in the area of flowing groundwater. 9 refs., 2 tabs., 7 figs

  2. Real-time remedial action against aperiodic small signal rotor angle instability

    DEFF Research Database (Denmark)

    Weckesser, Johannes Tilman Gabriel; Jóhannsson, Hjörtur; Østergaard, Jacob

    2016-01-01

    This paper presents a method that in real-time determines remedial actions, which restore stable operation with respect to aperiodic small signal rotor angle stability (ASSRAS) when insecure or unstable operation has been detected. An ASSRAS assessment method is used to monitor the stability...... impedance plane to determine an active power redispatch among selected generators to restore stable and secure operation. Since the method is purely based on analytically derived expression, the computation of the remedial actions is fast and well suited for real-time operation. The method was tested...... boundary for each generator in real-time. The ASSRAS boundary represents the condition when a generator reaches the maximum steady state active power injection. The proposed control method exploits analytically derived expressions for the ASSRAS boundary and other characteristic curves in the injection...

  3. Environmental compliance assessment findings for Weldon Spring Site Remedial Action Program

    International Nuclear Information System (INIS)

    Sigmon, C.F.; Levine, M.B.

    1990-01-01

    This report presents the results of an environmental assessment conducted at Weldon Spring Site Remedial Action Project (WSSRAP) in St. Charles County, Missouri, in accordance with the Formerly Utilized Sites Remedial Action Program (FUSRAP) Environmental Compliance Assessment Checklists. The purpose of this assessment was to evaluate the compliance of the site with applicable federal and Missouri environment regulations. Assessments activities included the following: review of site records, reports ,and files; inspection of the WSSRAP storage building, other selected buildings, and the adjacent grounds; and interviews with project personnel. This assessment was conducted on August 28-30, 1989. The assessment covered five management areas as set forth in the Checklist: Hazardous Waste Management, Polychlorinated Biphenyls (PCBs) Management; Air Emissions; Wastewater Discharges and Petroleum Management. No samples were collected. 1 ref., 2 figs., 1 tab

  4. Missouri State information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations

  5. Missouri State information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

  6. Overview of technology modeling in the Remedial Action Assessment System (RAAS)

    International Nuclear Information System (INIS)

    Johnson, C.D.; Bagaasen, L.M.; Chan, T.C.; Lamar, D.A.; Buelt, J.L.; Freeman, C.J.; Skeen, R.S.

    1994-08-01

    There are numerous hazardous waste sites under the jurisdiction of the US Department of Energy (DOE). To assist the cleanup of these sites in a more consistent, timely, and cost-effective manner, the Remedial Action Assessment System (RAAS) is being developed by the Pacific Northwest Laboratory (PNL). RAAS is a software tool designed to automate the initial technology selection within the remedial investigation/feasibility study (RI/FS) process. The software does several things for the user: (1) provides information about available remedial technologies, (2) sorts possible technologies to recommend a list of technologies applicable to a given site, (3) points out technical issues that may prevent the implementation of a technology, and (4) provides an estimate of the effectiveness of a given technology at a particular site. Information from RAAS can be used to compare remediation options and guide selection of technologies for further study

  7. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Reimbursement of costs incurred in accordance with a plan... Procedures § 765.30 Reimbursement of costs incurred in accordance with a plan for subsequent remedial action. (a) This section establishes procedures governing reimbursements of costs of remedial action incurred...

  8. Results of the independent verification of radiological remedial action at 87 East 5th South Street, Monticello, Utah (MS00074)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-10-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1984, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 87 East 5th South Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described

  9. Final report on Phase II remedial action at the former Middlesex Sampling Plant and associated properties. Volume 2

    International Nuclear Information System (INIS)

    1985-04-01

    Volume 2 presents the radiological measurement data taken after remedial action on properties surrounding the former Middlesex Sampling Plant during Phase II of the DOE Middlesex Remedial Action Program. Also included are analyses of the confirmatory radiological survey data for each parcel with respect to the remedial action criteria established by DOE for the Phase II cleanup and a discussion of the final status of each property. Engineering details of this project and a description of the associated health physics and environmental monitoring activities are presented in Volume 1

  10. Department of Energy Hazardous Waste Remedial Actions Program: An overview

    International Nuclear Information System (INIS)

    Eyman, L.D.; Swiger, R.F.

    1988-01-01

    This paper describes the national Department of Energy (DOE) program for managing hazardous waste. An overview of the DOE Hazardous Waste Remedial Actions Program (HAZWRAP), including its mission, organizational structure, and major program elements, is given. The paper focuses on the contractor support role assigned to Martin Marietta Energy Systems, Inc., through the establishment of the HAZWRAP Support Contractor Office (SCO). The major SCO programs are described, and the organization for managing the programs is discussed. The HAZWRAP SCO approaches to waste management planning and to technology research, development, and demonstration are presented. The role of the SCO in the DOE Environmental Restoration Program and the development of the DOE Waste Information network are reviewed. Also discussed is the DOE Work for Others Program, where waste management decentralized support, via interagency agreements between DOE and the Department of Defense and DOE and the Environmental Protection Agency, is provided for those sponsors planning remedial response actions. 2 refs

  11. Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.

  12. Model environmental assessment for a property-cleanup/interim-storage remedial action at a formerly utilized site

    International Nuclear Information System (INIS)

    Merry-Libby, P.

    1982-07-01

    This document has been prepared as a model for the preparation of an Environmental Assessment (EA) for a property-cleanup/interim-storage type of remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP) of the US Department of Energy (DOE). For major federal actions significantly affecting the quality of the human environment, an Environmental Impact Statement (EIS) must be prepared to aid DOE in making its decision. However, when it is not clear that an action is major and the impacts are significant, an EA may be prepared to determine whether to prepare an EIS or a finding of no significant impact (FONSI). If it is likely that an action may be major and the impacts significant, it is usually more cost-effective and timely to directly prepare an EIS. If it is likely that a FONSI can be reached after some environmental assessment, as DOE believes may be the case for most property-cleanup/interim-storage remedial actions, preparation of site-specific EAs is an effective means of compliance with NEPA

  13. Effects of the proposed EPA groundwater standards on the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Titus, F.B.

    1988-01-01

    Potential groundwater contamination beneath the 24 tailings piles that are to be stabilized under the UMTRA Project was intended in early project plans to be minimized by placing disposal piles over thick stratigraphic sequences of tight (minimally permeable) formations, and by designing covers that contained low permeability soil/clay infiltration barriers. The court-ordered revision of the UMTRA groundwater standards by EPA (proposed standards of September 1987) include very low Maximum Concentration Limits (MCLs), which are based mostly on Primary Drinking Water Standards. EPA also mandates that the designs should control radioactivity and hazardous constituents...for up to one thousand years, to the extends reasonably achievable, and, in any case, for at least two hundred years.... In order to accommodate this stipulation, transport modeling of water and contaminants in both the vadose and saturated zones beneath the piles is run until steady state conditions are reached. The early decision to locate stabilized piles over tight formations now exacerbates the problem of complying with the standards, since the contaminants percolate to groundwater that moves only slowly through strata having low permeabilities. Innovative solutions have been evaluated that are aimed at further minimizing long-term infiltration, geochemically fixing contaminants in place before they reach groundwater, or otherwise minimizing contaminant flux

  14. Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-08-01

    This characterization plan has been developed as part of the U.S. Department of Energy's (DOE's) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow

  15. Field Sampling Plan for the Operable Units 6-05 and 10-04 Remedial Action, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. Wells

    2006-11-14

    This Field Sampling Plan outlines the collection and analysis of samples in support of Phase IV of the Waste Area Group 10, Operable Units 6-05 and 10-04 remedial action. Phase IV addresses the remedial actions to areas with the potential for unexploded ordnance at the Idaho National Laboratory Site. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. The remedial action consists of removal and disposal of ordnance by high-order detonation, followed by sampling to determine the extent, if any, of soil that might have been contaminated by the detonation activities associated with the disposal of ordnance during the Phase IV activities and explosives during the Phase II activities.

  16. Strategic considerations for the sustainable remediation of nuclear installations.

    Science.gov (United States)

    Mobbs, S; Orr, P; Weber, I

    2017-08-05

    Nuclear sites around the world are being decommissioned and remedial actions are being undertaken to enable the sites or parts of the sites to be reused. Although this is relatively straightforward for most sites, experience has suggested that preventative action is needed to minimise the impact of remediation activities on the environment and the potential burden to future generations. Removing all contamination in order to make a site suitable for any use generates waste and has associated environmental, social and economic detriments and benefits that should be taken into account. Recent experience of OECD Nuclear Energy Agency (NEA) member countries in the remediation of contaminated land, predominantly contaminated soil and groundwater, on nuclear sites during decommissioning has been assessed by an NEA task group. The experience was used to identify strategic considerations for nuclear site remediation, to consider the application of sustainability principles to nuclear site remediation, to describe good practice, and to make recommendations for further research and development. The key aspects that were identified were that 1) site remediation should be sustainable by resulting in an overall net benefit; and 2) an adaptive approach is essential in order to take into account the inherent uncertainty associated with the decommissioning and site remediation timescales. A report describing the findings was published by OECD/NEA in 2016. The conclusions provide insights to decision makers, regulators, implementers and stakeholders involved in nuclear site decommissioning so that they can achieve sustainable remediation of nuclear sites, now and in the future. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. Technical considerations for the implementation of subsurface microbial barriers for restoration of groundwater at UMTRA sites

    Energy Technology Data Exchange (ETDEWEB)

    Tucker, M.D.

    1996-01-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Program is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the United States. The surface remediation phase, which has primarily focused on containment and stabilization of the abandoned uranium mill tailings piles, is nearing completion. Attention has now turned to the groundwater restoration phase. One alternative under consideration for groundwater restoration at UMTRA sites is the use of in-situ permeable reactive subsurface barriers. In this type of a system, contaminated groundwater will be allowed to flow naturally through a barrier filled with material which will remove hazardous constituents from the water by physical, chemical or microbial processes while allowing passage of the pore water. The subject of this report is a reactive barrier which would remove uranium and other contaminants of concern from groundwater by microbial action (i.e., a microbial barrier). The purpose of this report is to assess the current state of this technology and to determine issues that must be addressed in order to use this technology at UMTRA sites. The report focuses on six contaminants of concern at UMTRA sites including uranium, arsenic, selenium, molybdenum, cadmium and chromium. In the first section of this report, the fundamental chemical and biological processes that must occur in a microbial barrier to control the migration of contaminants are described. The second section contains a literature review of research which has been conducted on the use of microorganisms to immobilize heavy metals. The third section addresses areas which need further development before a microbial barrier can be implemented at an UMTRA site.

  18. Technical considerations for the implementation of subsurface microbial barriers for restoration of groundwater at UMTRA sites

    International Nuclear Information System (INIS)

    Tucker, M.D.

    1996-01-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Program is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the United States. The surface remediation phase, which has primarily focused on containment and stabilization of the abandoned uranium mill tailings piles, is nearing completion. Attention has now turned to the groundwater restoration phase. One alternative under consideration for groundwater restoration at UMTRA sites is the use of in-situ permeable reactive subsurface barriers. In this type of a system, contaminated groundwater will be allowed to flow naturally through a barrier filled with material which will remove hazardous constituents from the water by physical, chemical or microbial processes while allowing passage of the pore water. The subject of this report is a reactive barrier which would remove uranium and other contaminants of concern from groundwater by microbial action (i.e., a microbial barrier). The purpose of this report is to assess the current state of this technology and to determine issues that must be addressed in order to use this technology at UMTRA sites. The report focuses on six contaminants of concern at UMTRA sites including uranium, arsenic, selenium, molybdenum, cadmium and chromium. In the first section of this report, the fundamental chemical and biological processes that must occur in a microbial barrier to control the migration of contaminants are described. The second section contains a literature review of research which has been conducted on the use of microorganisms to immobilize heavy metals. The third section addresses areas which need further development before a microbial barrier can be implemented at an UMTRA site

  19. Risk-Based Management of Contaminated Groundwater: The Role of Geologic Heterogeneity, Exposure and Cancer Risk in Determining the Performance of Aquifer Remediation

    International Nuclear Information System (INIS)

    Maxwell, R.M.; Carle, S.F.; Tompson, A.F.B.

    2000-01-01

    The effectiveness of aquifer remediation is typically expressed in terms of a reduction in contaminant concentrations relative to a regulated maximum contaminant level (MCL), and is usually confined by sparse monitoring data and/or simple model calculations. Here, the effectiveness of remediation is examined from a risk-based perspective that goes beyond the traditional MCL concept. A methodology is employed to evaluate the health risk to individuals exposed to contaminated household water that is produced from groundwater. This approach explicitly accounts for differences in risk arising from variability in individual physiology and water use, the uncertainty in estimating chemical carcinogenesis for different individuals, and the uncertainties and variability in contaminant concentrations within groundwater. A hypothetical contamination scenario is developed as a case study in a saturated, alluvial aquifer underlying a real Superfund site. A baseline (unremediated) human exposure and health risk scenario, as induced by contaminated groundwater pumped from this site, is predicted and compared with a similar estimate based upon pump-and-treat exposure intervention. The predicted reduction in risk in the remediation scenario is not an equitable one-that is, it is not uniform to all individuals within a population and varies according to the level of uncertainty in prediction. The importance of understanding the detailed hydrogeologic connections that are established in the heterogeneous geologic regime between the contaminated source, municipal receptors, and remediation wells, and its relationship to this uncertainty is demonstrated. Using two alternative pumping rates, we develop cost-benefit curves based upon reduced exposure and risk to different individuals within the population, under the presence of uncertainty

  20. Information for consideration in reviewing groundwater protection plans for uranium mill tailings sites

    International Nuclear Information System (INIS)

    Thorne, P.D.

    1992-05-01

    Guidelines and acceptance criteria were developed for reviewing certain aspects of groundwater protection plans for uranium mill tailing sites. The aspects covered include: (1) leaching and long-term releases of hazardous and radioactive constituents from tailings and other contaminated materials, (2) attenuation of hazardous and radioactive constituents in groundwater under saturated and unsaturated conditions, (3) design and implementation of groundwater monitoring programs, (4) design and construction of groundwater protection barriers, and (5) efficiency and effectiveness of groundwater cleanup programs. The objective of these guidelines is to assist the US Nuclear Regulatory Commission staff in reviewing Remedial Action Plans for inactive waste sites and licensing application documents for active commercial uranium and thorium mills

  1. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

  2. Hanford Site Groundwater Monitoring for Fiscal Year 1999

    Energy Technology Data Exchange (ETDEWEB)

    MJ Hartman; LF Morasch; WD Webber

    2000-05-10

    This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 1999 on the US. Department of Energy's Hanford Site, Washington. Water-level monitoring was performed to evaluate groundwater flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Measurements for site-wide maps were conducted in June in past years and are now measured in March to reflect conditions that are closer to average. Water levels over most of the Hanford Site continued to decline between June 1998 and March 1999. The most widespread radiological contaminant plumes in groundwater were tritium and iodine-129. Concentrations of carbon-14, strontium-90, technetium-99, and uranium also exceeded drinking water standards in smaller plumes. Cesium-137 and plutonium exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in US Department of Energy Order 5400.5 were exceeded for plutonium, strontium-90, tritium, and uranium in small plumes or single wells. Nitrate and carbon tetrachloride are the most extensive chemical contaminants. Chloroform, chromium, cis-1,2dichloroethylene, cyanide, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Metals such as aluminum, cadmium, iron, manganese, and nickel exceeded their maximum contaminant levels in filtered samples from numerous wells; however, in most cases, they are believed to represent natural components of groundwater. ''Resource Conservation and Recovery Act of 1976'' groundwater monitoring continued at 25 waste management areas during fiscal year 1999: 16 under detection programs and data indicate that they are not adversely affecting groundwater; 6 under interim status groundwater quality assessment programs to assess contamination; and 2 under final status corrective-action programs. Another site, the 120-D-1 ponds

  3. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 3, Groundwater hydrology report. Revised final report

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-01

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent groundwater contamination resulting from processing activities at inactive uranium milling sites. According to the Uranium Mill Tailings Radiation Control Act of 1978, (UMTRCA) the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined this assessment shall include information on hydrogeologic site characterization. The water resources protection strategy that describes how the proposed action will comply with the EPA groundwater protection standards is presented in Attachment 4. Site characterization activities discussed in this section include: Characterization of the hydrogeologic environment; characterization of existing groundwater quality; definition of physical and chemical characteristics of the potential contaminant source; and description of local water resources.

  4. Results of the independent verification of radiological remedial action at 273 East 1st South Street, Monticello, Utah (MS00092)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-12-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1984 and 1985, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 273 East 1st South Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  5. Results of the independent verification of radiological remedial action at 280 South 3rd East Street, Monticello, Utah (MS00099)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Wilson, M.J.

    1990-02-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1985 and 1986, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 280 South 3rd East Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  6. Results of the independent verification of radiological remedial action at 397 East 3rd South Street, Monticello, Utah (MS00168)

    International Nuclear Information System (INIS)

    Wilson, M.J.; Crutcher, J.W.

    1991-07-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1987 and 1988, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 397 East 3rd South Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  7. Results of the independent verification of radiological remedial action at 464 South 1st East Street, Monticello, Utah (MS00071)

    International Nuclear Information System (INIS)

    Wilson, M.J.; Crutcher, J.W.

    1991-07-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1986 and 1987, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 464 South 1st East Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  8. Results of the independent verification of radiological remedial action at 98 East 5th South Street, Monticello, Utah (MS00076)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-10-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management program with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1984, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 98 East 5th South Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  9. Results of the independent verification of radiological remedial action at 381 East 3rd South Street, Monticello, Utah (MS00140)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-10-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1986, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity at 381 East 3rd South Street, Monticello, Utah. The Pollutant Assessments group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  10. Results of the independent verification of radiological remedial action at 281 East 3rd South Street, Monticello, Utah (MS00138)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Wilson, M.J.

    1990-02-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1985, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 281 East 3rd South Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  11. Results of the independent verification of radiological remedial action at 384 South 2nd East Street, Monticello, Utah (MS00084)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-10-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1984, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 384 South 2nd East Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  12. Results of the independent verification of radiological remedial action at 396 South 2nd East Street, Monticello, Utah (MS00085)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-12-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1985, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 396 South 2nd East Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 34 refs., 2 tabs

  13. Results of the independent verification of radiological remedial action at 225 South 2nd East Street, Monticello, Utah (MS00114)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-12-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1985 and 1986, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 225 South 2nd East Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  14. Results of the independent verification of radiological remedial action at 196 South 2nd East Street, Monticello, Utah (MS00135)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-12-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1986, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 196 South 2nd East Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  15. Results of the independent verification of radiological remedial action at 148 East 4th South Street, Monticello, Utah (MS00087)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-12-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1984, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 148 East 4th South Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  16. Results of the independent verification of radiological remedial action at 217 South 2nd East Street, Monticello, Utah (MS00097)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Wilson, M.J.

    1990-02-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1985 and 1986, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 217 South 2nd East Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  17. Results of the independent verification of radiological remedial action at 196 East 3rd South Street, Monticello, Utah (MS00083)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Smuin, M.W.

    1989-10-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE) Surplus Facilities Management program with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1984 and 1985, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 196 East 3rd South Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  18. Results of the independent verification of radiological remedial action at 433 South 2nd East Street, Monticello, Utah (MS00103)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Wilson, M.J.

    1990-02-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity)properties that had been contaminated by radioactive material resulting from mill operations. During 1984 and 1985, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 433 South 2nd East Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 2 tabs., 3 refs

  19. Results of the independent verification of radiological remedial action at 165 North 1st West Street, Monticello, Utah (MS00014)

    International Nuclear Information System (INIS)

    Crutcher, J.W.; Wilson, M.J.

    1990-02-01

    In 1980 the site of a vanadium and uranium mill at Monticello, Utah, was accepted into the US Department of Energy's (DOE's) Surplus Facilities Management Program, with the objectives of restoring the government-owned mill site to safe levels of radioactivity, disposing of or containing the tailings in an environmentally safe manner, and performing remedial actions on off-site (vicinity) properties that had been contaminated by radioactive material resulting from mill operations. During 1985 and 1986, UNC Geotech, the remedial action contractor designated by DOE, performed remedial action on the vicinity property at 217 South 2nd East Street, Monticello, Utah. The Pollutant Assessments Group (PAG) of Oak Ridge National Laboratory was assigned the responsibility of verifying the data supporting the adequacy of remedial action and confirming the site's compliance with DOE guidelines. The PAG found that the site successfully meets the DOE remedial action objectives. Procedures used by PAG are described. 3 refs., 2 tabs

  20. Analysis of expert opinion on uranium mill tailings remedial action project (UMTRAP) alternatives: a decision-support-system pilot study

    International Nuclear Information System (INIS)

    Thode, E.F.

    1983-01-01

    The Uranium Mill Tailings Remedial Action Project requires a specific remedial action individually chosen for each site. A panel of professionals was asked to rate objectives for remedial action and to rank alternatives for meeting the objectives. Responses were statistically analyzed. The panel's preference was earth cover in place at the Salt Lake City, Utah, and Shiprock, New Mexico, sites. Asphalt cover was next at Salt Lake City. This decision support system is appropriate for use with other inactive and active tailings sites

  1. Biochar- and phosphate-induced immobilization of heavy metals in contaminated soil and water: implication on simultaneous remediation of contaminated soil and groundwater.

    Science.gov (United States)

    Liang, Yuan; Cao, Xinde; Zhao, Ling; Arellano, Eduardo

    2014-03-01

    Long-term wastewater irrigation or solid waste disposal has resulted in the heavy metal contamination in both soil and groundwater. It is often separately implemented for remediation of contaminated soil or groundwater at a specific site. The main objective of this study was to demonstrate the hypothesis of simultaneous remediation of both heavy metal contaminated soil and groundwater by integrating the chemical immobilization and pump-and-treat methods. To accomplish the objective, three experiments were conducted, i.e., an incubation experiment was first conducted to determine how dairy-manure-derived biochar and phosphate rock tailing induced immobilization of Cd in the Cd-contaminated soils; second, a batch sorption experiment was carried out to determine whether the pre-amended contaminated soil still had the ability to retain Pb, Zn and Cd from aqueous solution. BCR sequential extraction as well as XRD and SEM analysis were conducted to explore the possible retention mechanism; and last, a laboratory-scale model test was undertaken by leaching the Pb, Zn, and Cd contaminated groundwater through the pre-amended contaminated soils to demonstrate how the heavy metals in both contaminated soil and groundwater were simultaneously retained and immobilized. The incubation experiment showed that the phosphate biochar were effective in immobilizing soil Cd with Cd concentration in TCLP (toxicity characteristics leaching procedure) extract reduced by 19.6 % and 13.7 %, respectively. The batch sorption experiment revealed that the pre-amended soil still had ability to retain Pb, Zn, and Cd from aqueous solution. The phosphate-induced metal retention was mainly due to the metal-phosphate precipitation, while both sorption and precipitation were responsible for the metal stabilization in the biochar amendment. The laboratory-scale test demonstrated that the soil amended with phosphate removed groundwater Pb, Zn, and Cd by 96.4 %, 44.6 %, and 49.2 %, respectively, and the

  2. Final record of decision for remedial actions at Operable Unit 4

    International Nuclear Information System (INIS)

    1994-12-01

    This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. This remedial action was selected in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and to the extent practicable 40 Code of Federal Regulations (CFR) Part 300, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). For Operable Unit 4 at the FEMP, DOE has chosen to complete an integrated CERCLA/NEPA process. This decision was based on the longstanding interest on the part of local stakeholders to prepare an Environmental Impact Statement (EIS) on the restoration activities at the FEMP and on the recognition that the draft document was issued and public comments received. Therefore, this single document is intended to serve as DOE's Record of Decision (ROD) for Operable Unit 4 under both CERCLA and NEPA; however, it is not the intent of the DOE to make a statement on the legal applicability of NEPA to CERCLA actions

  3. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. Remedial action selection report: Attachment 2, geology report; Attachment 3, ground water hydrology report; Attachment 4, supplemental information

    International Nuclear Information System (INIS)

    1998-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the U.S. Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, becomes Appendix B of the cooperative agreement between the DOE and the state of Colorado

  4. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. Remedial action selection report: Attachment 2, geology report; Attachment 3, ground water hydrology report; Attachment 4, supplemental information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the U.S. Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section} 7901 et seq. Part of the UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, becomes Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  5. Radiation induced oxidation for water remediation

    International Nuclear Information System (INIS)

    Gehringer, P.

    1997-01-01

    The action of ionizing radiation on halogenated hydrocarbons, in the presence and absence of ozone, was studied in water and wastewater. The combined ozone/electron-beam irradiation process was found especially suited for remediation of low-level contaminated groundwater. This combined treatment was often more effective than irradiation alone for wastewater decontamination. It reduced the COD without a simultaneous increase of BOD. Introduction of gaseous ozone directly into the irradiation chamber improved the water-flow turbulence, allowing treatment in layers thicker than the penetration range of the electrons, with increased decontamination efficiency. (author)

  6. Method of determining remedial control actions for a power system in an insecure state

    DEFF Research Database (Denmark)

    2013-01-01

    A method of determining remedial control actions for a power system in an insecure and unstable operating condition is provided. The power system has a plurality of generators injecting power into a network and each generator has a generator injection impedance and a stability boundary in the inj......A method of determining remedial control actions for a power system in an insecure and unstable operating condition is provided. The power system has a plurality of generators injecting power into a network and each generator has a generator injection impedance and a stability boundary...

  7. Proceedings of the remediation technologies symposium 2006

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This conference provided an opportunity for industry, practitioners, researchers and regulators to discuss technical issues in environmental remediation research and the latest innovations in soil and groundwater remediation. Cost effective in-situ and ex-situ soil reclamation strategies were presented along with groundwater and surface water remediation strategies in 13 sessions entitled: hydrocarbon contamination; salt management; liability management; chemical oxidation; light non-aqueous phase liquids (LNAPL); Montreal Center of Excellence in Brownfields Rehabilitation; Alberta government updates; phytoremediation; natural attenuation; Lake Wabamun; ex-situ remediation; in-situ remediation; and, miscellaneous issues. Technological solutions for erosion control and water clarification were highlighted. The conference featured 52 presentations, of which 17 have been catalogued separately for inclusion in this database. tabs., figs.

  8. Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan: Summary

    International Nuclear Information System (INIS)

    1996-08-01

    This document analyzes the potential environmental impacts associated with establishing future land-use objectives for the US Department of Energy's Hanford Site. Impact analysis is performed by examining the consequences (primarily from remediation activities) of the actions determined necessary to achieve a desired future land-use objective. It should be noted that site-specific decisions regarding remediation technologies and remediation activities would not be made by this document, but rather by processes specified in the Comprehensive Environmental Response, Compensation and Liability Act of 1980 and the Resource Conservation and Recovery Act of 1976. To facilitate the establishment of future land-use objectives, the Hanford Site was divided into four geographic areas: (1) Columbia River; (2) reactors on the river; (3) central plateau; (4) all other areas. The future land-use alternatives considered in detail for each of the geographic areas are as follows: Columbia River--unrestricted and restricted; reactors on the river--unrestricted and restricted; central plateau--exclusive; all other areas--restricted. A No-Action Alternative also is included to provide a baseline against which the potential impacts of the proposed action can be assessed

  9. Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  10. Radiological surveillance of Remedial Action activities at the processing site, Falls City, Texas. Final report

    International Nuclear Information System (INIS)

    1993-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project's Technical Assistance Contractor (TAC) performed a radiological surveillance of the Remedial Action Contractor (RAC), MK-Ferguson and CWM Federal Environmental Services, Inc., at the processing site in Falls City, Texas. This surveillance was conducted March 22--26, 1993. No findings were identified during the surveillance. Three site-specific observations and three programmatic observations are presented in this report. The overall conclusion from the surveillance is that the radiological aspects of the Falls City, Texas, remedial action program are performed adequately. However, some of the observations identify that there is potential for improving certain aspects of the occupational radiological air sampling, ensuring analytical data quality, and in communicating with the DOE and TAC on the ore sampling methods. The TAC has also received and is currently reviewing the RAC's responses regarding the observations identified during the radiological surveillance performed October 29--30, 1992

  11. Proposed plan for remedial action at the chemical plant area of the Weldon Spring site

    International Nuclear Information System (INIS)

    1992-11-01

    This proposed plan addresses the management of contaminated material at the chemical plant area of the Weldon Spring site and nearby properties in St. Charles County, Missouri. The site consists of a chemical plant area and a noncontiguous limestone quarry, both of which are radioactively and chemically contaminated as a result of past processing and disposal activities. Explosives were produced at the chemical plant in the 1940s, and uranium and thorium materials were processed in the 1950s and 1960s. Various liquid, sludge, and solid wastes were disposed of at the Chemical plant area and in the quarry during that time. The Weldon Spring site is listed on the National Priorities List (NPL) of the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) is conducting cleanup activities at the site under its Environmental Restoration and Waste Management Program. The proposed plan is organized as follows: Chapter 2 presents the history and setting of the Weldon Spring site and briefly describes the contaminated material at the chemical plant area. Chapter 3 defines the scope of the remedial action and its role in the Weldon Spring Site Remedial Action Project. Chapter 4 summarizes the risks associated with possible exposures to site contaminants in the absence of remedial action and identifies proposed cleanup levels for soil. Chapter 5 briefly describes the final alternatives considered for the remedial action. Chapter 6 summarizes the evaluation of final alternatives for managing the contaminated material, identifies the currently preferred alternative, and discusses a possible contingency remedy to provide treatment flexibility. Chapter 7 presents the community's role in this action. Chapter 8 is a list of the references cited in this proposed plan

  12. Remedial investigation for the chemical plant area of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1992-11-01

    The US Department of Energy (DOE) is responsible for management of the Weldon Spring Site Remedial Action Project (WSSRAP) under its Environmental Restoration and Waste Management Program. Major goals include eliminating potential public and environmental hazards due to site contamination and releasing the property for alternate uses to the maximum extent practicable. The purpose of the remedial investigation described in this report was to determine the extent of contamination associated with the portion of the Weldon Spring site known as the chemical plant and raffinate pit area. The DOE has assumed responsibility for investigating and remediating all on-site soil contamination and off-site soil which is radiologically contaminated as a result of uranium and thorium processing operations. The DOE has also assumed the responsibility for radiologically contaminated groundwater on and off site. The Weldon Spring site remedial investigation also involved the evaluation of the sources, nature and extent, and environmental fate and transport of contaminants to provide a basis for defining the risks that the contaminants may pose to human health and the environment. Data are included in this report to support the screening of remedial technologies and to permit the development and detailed analysis of alternatives for remedial action at the site during the feasibility study process

  13. REMOVAL OF ADDED NITRATE IN COTTON BURR COMPOST, MULCH COMPOST, AND PEAT: MECHANISMS AND POTENTIAL USE FOR GROUNDWATER NITRATE REMEDIATION

    Science.gov (United States)

    We conducted batch tests on the nature and kinetics of removal of added nitrate in cotton burr compost, mulch compost, and sphagnum peat that may be potentially used in a permeable reactive barrier (PRB) for groundwater nitrate remediation. A rigorous steam autoclaving protocol (...

  14. Data management implementation plan for the site characterization of the Waste Area Grouping 1 Groundwater Operable Unit at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Ball, T.S.; Nickle, E.B.

    1994-10-01

    The Waste Area Grouping (WAG) 1 Groundwater Operable Unit (OU) at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, is undergoing a site characterization. This project is not mandated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); therefore, no formalized meetings for data quality objective (DQO) development were held. Internally, DQOs were generated by the project team based on the end uses of the data to be collected. The 150-acre WAG 1 is contained within the ORNL security area. It includes all of the former ORNL radioisotope research, production, and maintenance facilities; former waste management areas; and some former administrative facilities. The goal of the WAG 1 Groundwater Site Characterization is to provide the necessary data on the nature and extent of groundwater contamination with an acceptable level of uncertainty to support the selection of remedial alternatives and to identify additional data needs for future actions. Primary objectives for the site characterization are: (1) To identify and characterize contaminant migration pathways based on the collection of groundwater data; (2) to identify sources of groundwater contamination and evaluate remedial actions which could be implemented to control or eliminate these sources; and (3) To conduct groundwater monitoring in support of other OUs in WAG 1 and the ORNL Groundwater OU

  15. Missouri state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and rgulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations

  16. Record of Decision for Tank Farm Soil and INTEC Groundwater, Operable Unit 3-14

    Energy Technology Data Exchange (ETDEWEB)

    L. S. Cahn

    2007-05-16

    This decision document presents the selected remedy for Operable Unit (OU) 3-14 tank farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center (INTEC), which is located on the Idaho National Laboratory (INL) Site. The tank farm was initially evaluated in the OU 3-13 Record of Decision (ROD), and it was determined that additional information was needed to make a final decision. Additional information has been obtained on the nature and extent of contamination in the tank farm and on the impact to groundwater. The selected remedy was chosen in accordance with the Comprehensive Environmental Response, Liability and Compensation Act of 1980 (CERCLA) (42 USC 9601 et seq.), as amended by the Superfund Amendments and Reauthorization Act of 1986 (Public Law 99-499) and the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR 300). The selected remedy is intended to be the final action for tank farm soil and groundwater at INTEC. The response action selected in this ROD is necessary to protect the public health, welfare, or the environment from actual or threatened releases of hazardous substances into the environment. Such a release or threat of release may present an imminent and substantial endangerment to public health, welfare, or the environment. The remedial actions selected in this ROD are designed to reduce the potential threats to human health and the environment to acceptable levels. In addition, DOE-ID, EPA, and DEQ (the Agencies) have determined that no action is necessary under CERCLA to protect public health, welfare, or the environment at 16 sites located outside the tank farm boundary. The purposes of the selected remedy are to (1) contain contaminated soil as the radionuclides decay in place, (2) isolate current and future workers and biological receptors from contact with contaminated soil, and (3) restore the portion of Snake River Plain Aquifer contaminated by INTEC releases to Idaho Ground Water Quality

  17. A/M Area Groundwater Corrective Action Southern Sector Remediation Technology Alternatives Evaluation

    International Nuclear Information System (INIS)

    Looney, B.B.; Phifer, M.A.

    1994-01-01

    Several technologies for clean up of solvents such as trichloroethylene, from groundwater were examined to determine the most reasonable strategy for the southern Sector in A/M Area of Savannah River Site. The most promising options identified were: pump and treat technology, airlift recirculation technology, and bioremediation technology. These options range from baseline/traditional methods to more innovative technologies. The traditional methods would be straightforward to implement, while the innovative methods have the potential to improve efficiency and reduce long term costs

  18. Cost benefit analysis of remediation alternatives for controlling the flux of strontium-90 into the Columbia River

    International Nuclear Information System (INIS)

    Gustafson, F.W.; Todd, M.E.

    1993-09-01

    The release of large volumes of water to waste disposal cribs at the Hanford Site's 100-N Area caused contaminants, principally strontium-90, to be carried toward the Columbia River through the groundwater. Since shutdown of the N Reactor, these releases have been discontinued, although small water flows continue to be discharged to the 1325-N crib. Most of the contamination which is now transported to the river is occurring as a result of the natural groundwater movement. The contaminated groundwater at N Springs flows into the river through seeps and springs along the river's edge. An expedited response action (ERA) has been proposed to eliminate or restrict the flux of strontium-90 into the river. A cost benefit analysis of potential remedial alternatives was completed that recommends the alternative which best meets given selection criteria prescribed by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The methodology used for evaluation, cost analysis, and alternative recommendation is the engineering evaluation/cost analysis (EE/CA). Complete remediation of the contaminated groundwater beneath 100-N Area was not a principal objective of the analysis. The objective of the cost benefit analysis was to identify a remedial alternative that optimizes the degree of benefit produced for the costs incurred

  19. Groundwater contaminant plume ranking

    International Nuclear Information System (INIS)

    1988-08-01

    Containment plumes at Uranium Mill Tailings Remedial Action (UMTRA) Project sites were ranked to assist in Subpart B (i.e., restoration requirements of 40 CFR Part 192) compliance strategies for each site, to prioritize aquifer restoration, and to budget future requests and allocations. The rankings roughly estimate hazards to the environment and human health, and thus assist in determining for which sites cleanup, if appropriate, will provide the greatest benefits for funds available. The rankings are based on the scores that were obtained using the US Department of Energy's (DOE) Modified Hazard Ranking System (MHRS). The MHRS and HRS consider and score three hazard modes for a site: migration, fire and explosion, and direct contact. The migration hazard mode score reflects the potential for harm to humans or the environment from migration of a hazardous substance off a site by groundwater, surface water, and air; it is a composite of separate scores for each of these routes. For ranking the containment plumes at UMTRA Project sites, it was assumed that each site had been remediated in compliance with the EPA standards and that relict contaminant plumes were present. Therefore, only the groundwater route was scored, and the surface water and air routes were not considered. Section 2.0 of this document describes the assumptions and procedures used to score the groundwater route, and Section 3.0 provides the resulting scores for each site. 40 tabs

  20. In situ remediation of chlorinated solvent-contaminated groundwater using ZVI/organic carbon amendment in China: field pilot test and full-scale application.

    Science.gov (United States)

    Yang, Jie; Meng, Liang; Guo, Lin

    2018-02-01

    Chlorinated solvents in groundwater pose threats to human health and the environment due to their carcinogenesis and bioaccumulation. These problems are often more severe in developing countries such as China. Thus, methods for chlorinated solvent-contaminated groundwater remediation are urgently needed. This study presents a technique of in situ remediation via the direct-push amendment injection that enhances the reductive dechlorination of chlorinated solvents in groundwater in the low-permeability aquifer. A field-based pilot test and a following real-world, full-scale application were conducted at an active manufacturing facility in Shanghai, China. The chlorinated solvents found at the clay till site included 1,1,1-trichloroethane (1,1,1-TCA), 1,1-dichloroethane (1,1-DCA), 1,1-dichloroethylene (1,1-DCE), vinyl chloride (VC), and chloroethane (CA). A commercially available amendment (EHC ® , Peroxychem, Philadelphia, PA) combining zero-valent iron and organic carbon was used to treat the above pollutants. Pilot test results showed that direct-push EHC injection efficiently facilitated the in situ reductive remediation of groundwater contaminated with chlorinated solvents. The mean removal rates of 1,1,1-TCA, 1,1-DCA, and 1,1-DCE at 270 days post-injection were 99.6, 99.3, and 73.3%, respectively, which were obviously higher than those of VC and CA (42.3 and 37.1%, respectively). Clear decreases in oxidation-reduction potential and dissolved oxygen concentration, and increases in Fe 2+ and total organic carbon concentration, were also observed during the monitoring period. These indicate that EHC promotes the anaerobic degradation of chlorinated hydrocarbons primarily via long-term biological reductive dechlorination, with instant chemical reductive dechlorination acting as a secondary pathway. The optimal effective time of EHC injection was 0-90 days, and its radius of influence was 1.5 m. In full-scale application, the maximum concentrations of 1,1,1-TCA

  1. Riverland expedited response action proposal

    International Nuclear Information System (INIS)

    1993-04-01

    The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion

  2. Full-scale testing and early production results from horizontal air sparging and soil vapor extraction wells remediating jet fuel in soil and groundwater at JFK International Airport, New York

    International Nuclear Information System (INIS)

    Roth, R.J.; Bianco, P.; Pressly, N.C.

    1996-01-01

    Jet fuel contaminated soil and groundwater contaminated at the International Arrivals Building (IAB) of the JFK International Airport in Jamaica, New York, are being remediated using soil vapor extraction (SVE) and air sparging (AS). The areal extent of the contaminated soil is estimated to be 70 acres and the volume of contaminated groundwater is estimated to be 2.3 million gallons. The remediation uses approximately 13,000 feet of horizontal SVE (HSVE) wells and 7,000 feet of horizontal AS (HAS) wells. The design of the HSVE and HAS wells was based on a pilot study followed by a full-scale test. In addition to the horizontal wells, 28 vertical AS wells and 15 vertical SVE wells are used. Three areas are being remediated, thus, three separate treatment systems have been installed. The SVE and AS wells are operated continuously while groundwater will be intermittently extracted at each HAS well, treated by liquid phase activated carbon and discharged into stormwater collection sewerage. Vapors extracted by the SVE wells are treated by vapor phase activated carbon and discharged into ambient air. The duration of the remediation is anticipated to be between two and three years before soil and groundwater are remediated to New York State cleanup criteria for the site. Based on the monitoring data for the first two months of operation, approximately 14,600 lbs. of vapor phase VOCs have been extracted. Analyses show that the majority of the VOCs are branched alkanes, branched alkenes, cyclohexane and methylated cyclohexanes

  3. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado: Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  4. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado: Revision 2

    International Nuclear Information System (INIS)

    1994-11-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS)

  5. Environmental remediation of an Alstom grid industrial site (France) - 59270

    International Nuclear Information System (INIS)

    Romero, Stephanie

    2012-01-01

    ALSTOM Grid is the project owner of the remediation of a former industrial site, located in Saint-Ouen, north of Paris. The industrial activity (power transformer production) started in 1921 and stopped in 2006. The type of pollution is linked with the former activity. It's an organic pollution: hydrocarbon, PCB and chlorinated volatile organic compounds. The clean-up concerns soil and groundwater. The main specificity of the project is that the remediation is operated inside the existing industrial buildings which must be kept in place and restituted to the owner after the works. The treatment of soil requires excavating soil up to 9 m deep (1 m under the level of the groundwater) inside the buildings. As a consequence, some impressive devices were set up to ensure the stability of the buildings during the clean-up, like support structures of the foundations and strengthening of the building fronts. In the same time, it has to be pointed out that great diversity of clean-up actions is performed on the site: the soil is excavated to be treated on site (bioremediation or chemical treatment) or off site. The treatment of groundwater consists of pumping the oil staying on the surface and oxidizing the dissolved pollution. This project is probably the first experience of this scale in France with multi-contaminated soil and groundwater decontamination in keeping and reinforcing the existing buildings. (authors)

  6. Permanganate gel (PG) for groundwater remediation: compatibility, gelation, and release characteristics.

    Science.gov (United States)

    Lee, Eung Seok; Olson, Pamela R; Gupta, Neha; Solpuker, Utku; Schwartz, Franklin W; Kim, Yongje

    2014-02-01

    Permanganate (MnO4(-)) is a strong oxidant that is widely used for treating chlorinated ethylenes in groundwater. This study aims to develop hyper-saline MnO4(-) solution (MnO4(-) gel; PG) that can be injected into aquifers via wells, slowly gelates over time, and slowly release MnO4(-) to flowing water. In this study, compatibility and miscibility of gels, such as chitosan, aluminosilicate, silicate, and colloidal silica gels, with MnO4(-) were tested. Of these gels, chitosan was reactive with MnO4(-). Aluminosilicates were compatible but not readily miscible with MnO4(-). Silicates and colloidal silica were both compatible and miscible with MnO4(-), and gelated with addition of KMnO4 granules. Colloidal silica has low initial viscosity (<15cP), exhibited delayed gelation characteristics with the lag times ranging from 0 to 200min. Release of MnO4(-) from the colloidal silica-based PG gel occurred in a delayed fashion, with maximum duration of 24h. These results suggested that colloidal silica can be used to create PG or delayed-gelling forms containing other oxidants which can be used for groundwater remediation. Copyright © 2013 Elsevier Ltd. All rights reserved.

  7. Remediation of the Highland Drive South Ravine, Port Hope, Ontario: Contaminated Groundwater Discharge Management Using Permeable Reactive Barriers and Contaminated Sediment Removal - 13447

    Energy Technology Data Exchange (ETDEWEB)

    Smyth, David; Roos, Gillian [Golder Associates Ltd., 2390 Argentia Road, Mississauga, ON L5N 5Z7 (Canada); Ferguson Jones, Andrea [MMM Group Ltd., 100 Commerce Valley Drive West, Thornhill, ON L3T 0A1 (Canada); Case, Glenn [AECL Port Hope Area Initiative Management Office, 115 Toronto Road, Port Hope, ON L1A 3S4 (Canada); Yule, Adam [Public Works and Government Services Canada, 4900 Yonge Street, 11th Floor, Toronto, ON, M2N 6A6 (Canada)

    2013-07-01

    The Highland Drive South Ravine (HDSR) is the discharge area for groundwater originating from the Highland Drive Landfill, the Pine Street North Extension (PSNE) roadbed parts of the Highland Drive roadbed and the PSNE Consolidation Site that contain historical low-level radioactive waste (LLRW). The contaminant plume from these LLRW sites contains elevated concentrations of uranium and arsenic and discharges with groundwater to shallow soils in a wet discharge area within the ravine, and directly to Hunt's Pond and Highland Drive South Creek, which are immediately to the south of the wet discharge area. Remediation and environmental management plans for HDSR have been developed within the framework of the Port Hope Project and the Port Hope Area Initiative. The LLRW sites will be fully remediated by excavation and relocation to a new Long-Term Waste Management Facility (LTWMF) as part of the Port Hope Project. It is projected, however, that the groundwater contaminant plume between the remediated LLRW sites and HDSR will persist for several hundreds of years. At the HDSR, sediment remediation within Hunt's Ponds and Highland Drive South Creek, excavation of the existing and placement of clean fill will be undertaken to remove current accumulations of solid-phase uranium and arsenic associated with the upper 0.75 m of soil in the wet discharge area, and permeable reactive barriers (PRBs) will be used for in situ treatment of contaminated groundwater to prevent the ongoing discharge of uranium and arsenic to the area in HDSR where shallow soil excavation and replacement has been undertaken. Bench-scale testing using groundwater from HDSR has confirmed excellent treatment characteristics for both uranium and arsenic using permeable reactive mixtures containing granular zero-valent iron (ZVI). A sequence of three PRBs containing ZVI and sand in backfilled trenches has been designed to intercept the groundwater flow system prior to its discharge to the ground

  8. Remediation of the Highland Drive South Ravine, Port Hope, Ontario: Contaminated Groundwater Discharge Management Using Permeable Reactive Barriers and Contaminated Sediment Removal - 13447

    International Nuclear Information System (INIS)

    Smyth, David; Roos, Gillian; Ferguson Jones, Andrea; Case, Glenn; Yule, Adam

    2013-01-01

    The Highland Drive South Ravine (HDSR) is the discharge area for groundwater originating from the Highland Drive Landfill, the Pine Street North Extension (PSNE) roadbed parts of the Highland Drive roadbed and the PSNE Consolidation Site that contain historical low-level radioactive waste (LLRW). The contaminant plume from these LLRW sites contains elevated concentrations of uranium and arsenic and discharges with groundwater to shallow soils in a wet discharge area within the ravine, and directly to Hunt's Pond and Highland Drive South Creek, which are immediately to the south of the wet discharge area. Remediation and environmental management plans for HDSR have been developed within the framework of the Port Hope Project and the Port Hope Area Initiative. The LLRW sites will be fully remediated by excavation and relocation to a new Long-Term Waste Management Facility (LTWMF) as part of the Port Hope Project. It is projected, however, that the groundwater contaminant plume between the remediated LLRW sites and HDSR will persist for several hundreds of years. At the HDSR, sediment remediation within Hunt's Ponds and Highland Drive South Creek, excavation of the existing and placement of clean fill will be undertaken to remove current accumulations of solid-phase uranium and arsenic associated with the upper 0.75 m of soil in the wet discharge area, and permeable reactive barriers (PRBs) will be used for in situ treatment of contaminated groundwater to prevent the ongoing discharge of uranium and arsenic to the area in HDSR where shallow soil excavation and replacement has been undertaken. Bench-scale testing using groundwater from HDSR has confirmed excellent treatment characteristics for both uranium and arsenic using permeable reactive mixtures containing granular zero-valent iron (ZVI). A sequence of three PRBs containing ZVI and sand in backfilled trenches has been designed to intercept the groundwater flow system prior to its discharge to the ground surface

  9. Dynamic remedial action scheme using online transient stability analysis

    Science.gov (United States)

    Shrestha, Arun

    Economic pressure and environmental factors have forced the modern power systems to operate closer to their stability limits. However, maintaining transient stability is a fundamental requirement for the operation of interconnected power systems. In North America, power systems are planned and operated to withstand the loss of any single or multiple elements without violating North American Electric Reliability Corporation (NERC) system performance criteria. For a contingency resulting in the loss of multiple elements (Category C), emergency transient stability controls may be necessary to stabilize the power system. Emergency control is designed to sense abnormal conditions and subsequently take pre-determined remedial actions to prevent instability. Commonly known as either Remedial Action Schemes (RAS) or as Special/System Protection Schemes (SPS), these emergency control approaches have been extensively adopted by utilities. RAS are designed to address specific problems, e.g. to increase power transfer, to provide reactive support, to address generator instability, to limit thermal overloads, etc. Possible remedial actions include generator tripping, load shedding, capacitor and reactor switching, static VAR control, etc. Among various RAS types, generation shedding is the most effective and widely used emergency control means for maintaining system stability. In this dissertation, an optimal power flow (OPF)-based generation-shedding RAS is proposed. This scheme uses online transient stability calculation and generator cost function to determine appropriate remedial actions. For transient stability calculation, SIngle Machine Equivalent (SIME) technique is used, which reduces the multimachine power system model to a One-Machine Infinite Bus (OMIB) equivalent and identifies critical machines. Unlike conventional RAS, which are designed using offline simulations, online stability calculations make the proposed RAS dynamic and adapting to any power system

  10. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  11. A stratigraphic model to support remediation of groundwater contamination in the southern San Francisco Bay area

    International Nuclear Information System (INIS)

    Steinpress, M.G.

    1993-01-01

    Some early regional studies in the southern San Francisco Bay Area applied the term 'older bay mud' to Wisconsin and older deposits thought to be estuarine in origin. This outdated interpretation has apparently contributed to an expectation of laterally-continuous aquifers and aquitards. In fact, heterogeneous alluvial deposits often create complex hydrogeologic settings that defy simple remedial approaches. A more useful stratigraphic model provides a foundation for conducting site investigations and assessing the feasibility of remediation. A synthesis of recent regional studies and drilling results at one site on the southwest margin of the Bay indicate that the upper quaternary stratigraphy consists of four primary units in the upper 200 feet of sediments (oldest to youngest): (1) Illinoian glacial-age alluvium (an important groundwater source); (2) Sangamon interglacial-age deposits, which include fine-grained alluvial deposits and estuarine deposits equivalent to the Yerba Buena Mud (a regional confining layer); (3) Wisconsin glacial-age alluvial fan and floodplain deposits; and (4) Holocene interglacial-age sediments, which include fine-grained alluvial and estuarine deposits equivalent to the 'younger bay mud'. Remedial investigations generally focus on groundwater contamination in the Wisconsin and Holocene alluvial deposits. Detailed drilling results indicate that narrow sand and gravel channels occur in anastomosing patterns within a Wisconsin to Holocene floodplain sequence dominated by interchannel silts and clays. The identification of these small-scale high-permeability conduits is critical to understanding and predicting contaminant transport on a local scale. Discontinuous site-specific aquitards do not provide competent separation where stacked channels occur and the correlation of aquitards over even small distance is often tenuous at best

  12. RCRA groundwater data analysis protocol for the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Chou, C.J.; Jackson, R.L.

    1992-04-01

    The Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring program currently involves site-specific monitoring of 20 facilities on the Hanford Site in southeastern Washington. The RCRA groundwater monitoring program has collected abundant data on groundwater quality. These data are used to assess the impact of a facility on groundwater quality or whether remediation efforts under RCRA corrective action programs are effective. Both evaluations rely on statistical analysis of groundwater monitoring data. The need for information on groundwater quality by regulators and environmental managers makes statistical analysis of monitoring data an important part of RCRA groundwater monitoring programs. The complexity of groundwater monitoring programs and variabilities (spatial, temporal, and analytical) exhibited in groundwater quality variables indicate the need for a data analysis protocol to guide statistical analysis. A data analysis protocol was developed from the perspective of addressing regulatory requirements, data quality, and management information needs. This data analysis protocol contains four elements: data handling methods; graphical evaluation techniques; statistical tests for trend, central tendency, and excursion analysis; and reporting procedures for presenting results to users

  13. Overview of Chromium Remediation Technology Evaluations At The Hanford Site, Richland Washington

    Science.gov (United States)

    Morse, J. G.; Hanson, J. P.

    2009-12-01

    This paper will present an overview of the different technologies and the results to date for optimizing and improving the remediation of Cr+6 in the soil and groundwater at the Hanford Site. The Hanford Site, par of the U.S. Department of Energy's (DOE)nuclear weapons complex, encompasses approximately 586 square miles in southeast Washington State. The Columbia River flows through the site (Hanford Reach.) Reactors were located along the Hanford Reach as part of the production process. Sodium dichromate was used as a corrosion inhibitor in the cooling water for the reactors. As a result chromium (Cr+6) is present in the soil and groundwater. Since the mid 90's interim groundwater pump and treat systems have been in place to try and contain or mitigate the migration of contaminated groundwater into the Columbia River. The primary concern being the protection of aquatic spawning habitat for salmon and other species. In order to improve the effectiveness of the remedial actions a number of different technologies have been evaluated and/or deployed. These include, permeable reactive barriers, in-situ bio-stimulation, in-situ chemical reduction, zero-valent iron injection and evaluation of improved above ground treatment technologies. An overview of the technologies and results to date are presented.

  14. 28 CFR 54.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-07-01

    .... 264. (c) Self-evaluation. Each recipient education institution shall, within one year of September 29... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Remedial and affirmative action and self... ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE...

  15. 45 CFR 618.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-10-01

    ... Order 12107, 3 CFR, 1978 Comp., p. 264. (c) Self-evaluation. Each recipient education institution shall... 45 Public Welfare 3 2010-10-01 2010-10-01 false Remedial and affirmative action and self-evaluation. 618.110 Section 618.110 Public Welfare Regulations Relating to Public Welfare (Continued...

  16. 45 CFR 2555.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-10-01

    ... Order 12107, 3 CFR, 1978 Comp., p. 264. (c) Self-evaluation. Each recipient education institution shall... 45 Public Welfare 4 2010-10-01 2010-10-01 false Remedial and affirmative action and self-evaluation. 2555.110 Section 2555.110 Public Welfare Regulations Relating to Public Welfare (Continued...

  17. 22 CFR 229.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-04-01

    .... 264. (c) Self-evaluation. Each recipient education institution shall, within one year of September 29... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Remedial and affirmative action and self... ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE...

  18. 10 CFR 1042.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-01-01

    .... (c) Self-evaluation. Each recipient education institution shall, within one year of February 20, 2001... 10 Energy 4 2010-01-01 2010-01-01 false Remedial and affirmative action and self-evaluation. 1042... OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 1042...

  19. In-situ remediation system for groundwater and soils

    Science.gov (United States)

    Corey, John C.; Kaback, Dawn S.; Looney, Brian B.

    1993-01-01

    A method and system for in-situ remediation of contaminated groundwater and soil where the contaminants, such as toxic metals, are carried in a subsurface plume. The method comprises selection and injection into the soil of a fluid that will cause the contaminants to form stable, non-toxic compounds either directly by combining with the contaminants or indirectly by creating conditions in the soil or changing the conditions of the soil so that the formation of stable, non-toxic compounds between the contaminants and existing substances in the soil are more favorable. In the case of non-toxic metal contaminants, sulfides or sulfates are injected so that metal sulfides or sulfates are formed. Alternatively, an inert gas may be injected to stimulate microorganisms in the soil to produce sulfides which, in turn, react with the metal contaminants. Preferably, two wells are used, one to inject the fluid and one to extract the unused portion of the fluid. The two wells work in combination to create a flow of the fluid across the plume to achieve better, more rapid mixing of the fluid and the contaminants.

  20. Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This characterization plan has been developed as part of the U.S. Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  1. Robust remediation strategies at gas-work sites: a case of source recognition and source characterization

    International Nuclear Information System (INIS)

    Vries, P.O. de

    2005-01-01

    In The Netherlands there have been gasworks at about 260 to 270 locations. Most of these locations are or were heavily polluted with tar, ashes and cyanides and many of them belong to the locations where remediation actions have already been executed. It seems however that many of them also belong to the locations where remediation actions were not quite as successful as was expected. So, for many gas-work sites that were already 'remedied' in the 80's and early 90's of the foregoing century, new programs for site remediation are planned. Of course the mistakes from the past should now be avoided. The current remediation strategy in The Netherlands for gas-work sites can be comprised in four steps: 1 - removing spots in the top soil, 2 - removing spots with mobile components in the shallow subsoil, 3 - controlling spots with mobile components in the deep subsoil, 4 - creating a 'steady endpoint situation' in the plume. At many former gas-work sites real sources, i.e. in a physico-chemical sense, are not very well known. This can easily lead to insufficient removal of some or part of these sources and cause a longer delivery of contaminants to the groundwater plume, with higher endpoint concentrations, higher costs and more restrictions for future use. The higher concentrations and longer deliveries originating from not recognized or not localized sources are often not sufficiently compensated by the proposed plume management in current remediation strategies. Remediation results can be improved by using knowledge about the processes that determine the delivery of contaminants to the groundwater, the materials that cause these delivery and the locations at the site where these are most likely found. When sources are present in the deep subsoil or the exact localization of sources is uncertain, robust remediation strategies should be chosen and wishful thinking about removing sources with in situ techniques should be avoided. Robust strategies are probably less

  2. Demonstrating practical application of soil and groundwater clean-up and recovery technologies at natural gas processing facilities: Bioventing, air sparging and wetlands remediation

    International Nuclear Information System (INIS)

    Moore, B.

    1996-01-01

    This issue of the project newsletter described the nature of bioventing, air sparging and wetland remediation. It reviewed their effectiveness in remediating hydrocarbon contaminated soil above the groundwater surface. Bioventing was described as an effective, low cost treatment in which air is pumped below ground to stimulate indigenous bacteria. The bacteria then use the oxygen to consume the hydrocarbons, converting them to CO 2 and water. Air sparging involves the injection of air below the groundwater surface. As the air rises, hydrocarbons are stripped from the contaminated soil and water. The advantage of air sparging is that it cleans contaminated soil and water from below the groundwater surface. Hydrocarbon contamination of wetlands was described as fairly common. Conventional remediation methods of excavation, trenching, and bellholes to remove contamination often cause extreme harm to the ecosystem. Recent experimental evidence suggests that wetlands may be capable of attenuating contaminated water through natural processes. Four hydrocarbon contaminated wetlands in Alberta are currently under study. Results to date show that peat's high organic content promotes sorption and biodegradation and that some crude oil spills can been resolved by natural processes. It was suggested that assuming peat is present, a good clean-up approach may be to contain the contaminant source, monitor the lateral and vertical extent of contamination, and wait for natural processes to resolve the problem. 3 figs

  3. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  4. Biological assessment of remedial action at the abandoned uranium mill tailings site near Naturita, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, the U.S. Department of Energy (DOE) is proposing to conduct remedial action to clean up the residual radioactive materials (RRM) at the Naturita uranium processing site in Colorado. The Naturita site is in Montrose County, Colorado, and is approximately 2 miles (mi) (3 kilometer [km]) from the unincorporated town of Naturita. The proposed remedial action is to remove the RRM from the Naturita site to the Upper Burbank Quarry at the Uravan disposal site. To address the potential impacts of the remedial action on threatened and endangered species, the DOE prepared this biological assessment. Informal consultations with the U.S. Department of the Interior, Fish and Wildlife Service (FWS) were initiated in 1986, and the FWS provided a list of the threatened and endangered species that may occur in the Naturita study area. This list was updated by two FWS letters in 1988 and by verbal communication in 1990. A biological assessment was included in the environmental assessment (EA) of the proposed remedial action that was prepared in 1990. This EA addressed the impacts of moving the Naturita RRM to the Dry Flats disposal site. In 1993, the design for the Dry Flats disposal alternative was changed. The FWS was again consulted in 1993 and provided a new list of threatened and endangered species that may occur in the Naturita study area. The Naturita EA and the biological assessment were revised in response to these changes. In 1994, remedial action was delayed because an alternate disposal site was being considered. The DOE decided to move the FIRM at the Naturita site to the Upper Burbank Quarry at the Uravan site. Due to this delay, the FWS was consulted in 1995 and a list of threatened and endangered species was provided. This biological assessment is a revision of the assessment attached to the Naturita EA and addresses moving the Naturita RRM to the Upper Burbank Quarry disposal site.

  5. Pilot plant experiences using physical and biological treatment steps for the remediation of groundwater from a former MGP site

    Energy Technology Data Exchange (ETDEWEB)

    Wirthensohn, T. [University of Natural Resources and Applied Life Sciences-Vienna, Department of IFA-Tulln, Institute for Environmental Biotechnology, Konrad Lorenz Strasse 20, 3430 Tulln (Austria)], E-mail: thomas.wirthensohn@boku.ac.at; Schoeberl, P. [Wienenergie Gasnetz GmbH, Referat 17-Altlasten, Josefstaedterstrasse 10-12, 1080 Vienna (Austria); Ghosh, U. [Department of Civil and Environmental Engineering, University of Maryland Baltimore County, Baltimore, MD 21250 (United States); Fuchs, W. [University of Natural Resources and Applied Life Sciences-Vienna, Department of IFA-Tulln, Institute for Environmental Biotechnology, Konrad Lorenz Strasse 20, 3430 Tulln (Austria)

    2009-04-15

    The production of manufactured gas at a site in Vienna, Austria led to the contamination of soil and groundwater with various pollutants including PAHs, hydrocarbons, phenols, BTEX, and cyanide. The site needs to be remediated to alleviate potential impacts to the environment. The chosen remediation concept includes the excavation of the core contaminated site and the setup of a hydraulic barrier to protect the surrounding aquifer. The extracted groundwater will be treated on-site. To design the foreseen pump-and-treat system, a pilot-scale plant was built and operated for 6 months. The scope of the present study was to test the effectiveness of different process steps, which included an aerated sedimentation basin, a submerged fixed film reactor (SFFR), a multi-media filter, and an activated carbon filter. The hydraulic retention time (HRT) was 7.0 h during normal flow conditions and 3.5 h during high flow conditions. The treatment system was effective in reducing the various organic and inorganic pollutants in the pumped groundwater. However, it was also demonstrated that appropriate pre-treatment was essential to overcome problems with clogging due to precipitation of tar and sulfur compounds. The reduction of the typical contaminants, PAHs and BTEX, was more than 99.8%. All water quality parameters after treatment were below the Austrian legal requirements for discharge into public water bodies.

  6. Pilot plant experiences using physical and biological treatment steps for the remediation of groundwater from a former MGP site.

    Science.gov (United States)

    Wirthensohn, T; Schoeberl, P; Ghosh, U; Fuchs, W

    2009-04-15

    The production of manufactured gas at a site in Vienna, Austria led to the contamination of soil and groundwater with various pollutants including PAHs, hydrocarbons, phenols, BTEX, and cyanide. The site needs to be remediated to alleviate potential impacts to the environment. The chosen remediation concept includes the excavation of the core contaminated site and the setup of a hydraulic barrier to protect the surrounding aquifer. The extracted groundwater will be treated on-site. To design the foreseen pump-and-treat system, a pilot-scale plant was built and operated for 6 months. The scope of the present study was to test the effectiveness of different process steps, which included an aerated sedimentation basin, a submerged fixed film reactor (SFFR), a multi-media filter, and an activated carbon filter. The hydraulic retention time (HRT) was 7.0 h during normal flow conditions and 3.5h during high flow conditions. The treatment system was effective in reducing the various organic and inorganic pollutants in the pumped groundwater. However, it was also demonstrated that appropriate pre-treatment was essential to overcome problems with clogging due to precipitation of tar and sulfur compounds. The reduction of the typical contaminants, PAHs and BTEX, was more than 99.8%. All water quality parameters after treatment were below the Austrian legal requirements for discharge into public water bodies.

  7. Pilot plant experiences using physical and biological treatment steps for the remediation of groundwater from a former MGP site

    International Nuclear Information System (INIS)

    Wirthensohn, T.; Schoeberl, P.; Ghosh, U.; Fuchs, W.

    2009-01-01

    The production of manufactured gas at a site in Vienna, Austria led to the contamination of soil and groundwater with various pollutants including PAHs, hydrocarbons, phenols, BTEX, and cyanide. The site needs to be remediated to alleviate potential impacts to the environment. The chosen remediation concept includes the excavation of the core contaminated site and the setup of a hydraulic barrier to protect the surrounding aquifer. The extracted groundwater will be treated on-site. To design the foreseen pump-and-treat system, a pilot-scale plant was built and operated for 6 months. The scope of the present study was to test the effectiveness of different process steps, which included an aerated sedimentation basin, a submerged fixed film reactor (SFFR), a multi-media filter, and an activated carbon filter. The hydraulic retention time (HRT) was 7.0 h during normal flow conditions and 3.5 h during high flow conditions. The treatment system was effective in reducing the various organic and inorganic pollutants in the pumped groundwater. However, it was also demonstrated that appropriate pre-treatment was essential to overcome problems with clogging due to precipitation of tar and sulfur compounds. The reduction of the typical contaminants, PAHs and BTEX, was more than 99.8%. All water quality parameters after treatment were below the Austrian legal requirements for discharge into public water bodies

  8. 6 CFR 17.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-01-01

    .... 264. (c) Self-evaluation. Each recipient education institution shall, within one year of March 6, 2003... 6 Domestic Security 1 2010-01-01 2010-01-01 false Remedial and affirmative action and self... NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE...

  9. 43 CFR 41.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-10-01

    .... 264. (c) Self-evaluation. Each recipient education institution shall, within one year of September 29... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Remedial and affirmative action and self... NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE...

  10. 14 CFR 1253.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-01-01

    .... 264. (c) Self-evaluation. Each recipient education institution shall, within one year of September 29... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Remedial and affirmative action and self... NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE...

  11. 34 CFR 106.3 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Remedial and affirmative action and self-evaluation. 106.3 Section 106.3 Education Regulations of the Offices of the Department of Education OFFICE FOR.... (c) Self-evaluation. Each recipient education institution shall, within one year of the effective...

  12. ZVI-Clay remediation of a chlorinated solvent source zone, Skuldelev, Denmark: 2. Groundwater contaminant mass discharge reduction

    DEFF Research Database (Denmark)

    Fjordbøge, Annika Sidelmann; Lange, Ida Vedel; Bjerg, Poul Løgstrup

    2012-01-01

    The impact of source mass depletion on the down-gradient contaminant mass discharge was monitored for a 19-month period as a part of a field demonstration of the ZVI-Clay soil mixing remediation technology. Groundwater samples were collected from conventional monitoring wells (120 samples) and a ...... down-gradient contaminant mass discharge reduction (76%) for the parent compound (PCE), while the overall reduction of chlorinated ethenes was smaller (21%)....

  13. Case study: Free product recovery and site remediation using horizontal trenching, soil vapor treatment and groundwater extraction

    International Nuclear Information System (INIS)

    Sanderson, E.P.; Johnston, H.S. Jr.; Farrell, M.; Twedell, D.B.

    1993-01-01

    Sites with soil and groundwater impacted by petroleum hydrocarbons have been remediated using a variety of traditional techniques. However, when the site impacted lies within a very confined downtown area of an expanding metropolitan city, a more complex array of technologies must be considered. The Law Enforcement Center site is the City of Charlotte's worst known underground storage tank (UST) release to date. A cost effective free product recovery, soil vapor and groundwater extraction system is being piloted here using new horizontal trenching technology and state of the art equipment. On-site low permeability soil required that an alternative to standard recovery wells be developed for groundwater recovery and vapor extraction. Operation and maintenance (O and M) of the large number of recovery wells required would have been extremely costly over the expected lifetime of the project. Although horizontal trenching was the best solution to the O and M costs, many problems were encountered during their installation

  14. Sustainable remediation: electrochemically assisted microbial dechlorination of tetrachloroethene-contaminated groundwater.

    Science.gov (United States)

    Patil, Sayali S; Adetutu, Eric M; Rochow, Jacqueline; Mitchell, James G; Ball, Andrew S

    2014-01-01

    Microbial electric systems (MESs) hold significant promise for the sustainable remediation of chlorinated solvents such as tetrachlorethene (perchloroethylene, PCE). Although the bio-electrochemical potential of some specific bacterial species such as Dehalcoccoides and Geobacteraceae have been exploited, this ability in other undefined microorganisms has not been extensively assessed. Hence, the focus of this study was to investigate indigenous and potentially bio-electrochemically active microorganisms in PCE-contaminated groundwater. Lab-scale MESs were fed with acetate and carbon electrode/PCE as electron donors and acceptors, respectively, under biostimulation (BS) and BS-bioaugmentation (BS-BA) regimes. Molecular analysis of the indigenous groundwater community identified mainly Spirochaetes, Firmicutes, Bacteroidetes, and γ and δ-Proteobacteria. Environmental scanning electron photomicrographs of the anode surfaces showed extensive indigenous microbial colonization under both regimes. This colonization and BS resulted in 100% dechlorination in both treatments with complete dechlorination occurring 4 weeks earlier in BS-BA samples and up to 11.5 μA of current being generated. The indigenous non-Dehalococcoides community was found to contribute significantly to electron transfer with ∼61% of the current generated due to their activities. This study therefore shows the potential of the indigenous non-Dehalococcoides bacterial community in bio-electrochemically reducing PCE that could prove to be a cost-effective and sustainable bioremediation practice. © 2013 The Authors. Microbial Biotechnology published by John Wiley & Sons Ltd and Society for Applied Microbiology.

  15. Expedited Remedial Action Program (SB 923): A California Brownfields initiative

    Energy Technology Data Exchange (ETDEWEB)

    Cambridge, M.; Wolfenden, A.K.

    1996-12-31

    California`s Expedited Remedial Action Program (ERAP) created a comprehensive program that promotes an equitable and expedited approach for redevelopment of properties contaminated with hazardous substances. This bill embodies an emerging trend in environmental policy that permits flexibility, cooperation and creativity without compromising protection to public health or the environment. Within the California Environmental Protection Agency, the Department of Toxic Substances Control (DTSC) is promoting a number of programs to facilitate the restoration of contaminated properties as part of its Brownfields initiative. ERAP represents a potentially more efficient process to remediate sites by minimizing economic risks through a clearly identified liability scheme, indemnifying future owners through a covenant not to sue, and providing risk based cleanups that are based on the permanent use of the site.

  16. Petrol contaminated groundwater treatment with air-stripper in Balassagyarmat, Hungary

    International Nuclear Information System (INIS)

    Szabo, Peter; Bernath, Balazs

    2005-01-01

    Hydrocarbon contaminated groundwater is a common environmental problem in Hungary. Leakage of underground storage tanks, pipe break or illegal tapping as well as lorry accidents can be mentioned as main reasons. MEGATERRA Ltd. elaborated, adopted and tested several groundwater clean-up methods. These methods are based on detailed survey and investigation, sampling and analysis, delineation of contaminated groundwater, risk assessment, establishment of monitoring wells, pumping tests and remediation action plan. One of these methods was implemented by MEGATERRA Ltd. in Balassagyarmat, Hungary. Contamination source was a 10 m 3 vol. simple wall underground fuel-storage tank, which had been emptied. When the remediation started in April 1998, the petrol had already been accumulated on the ground water table forming a 5-7 m wide and 10-15 m long plume being expanded to SSE-NNW direction. The area of the dissolved hydrocarbon contaminated groundwater-body was 1 000 m 2 and its concentration reached up to 30-40 mg/l TPH. The free-phase hydrocarbon layer was 10 cm thick. For the remediation of contaminated groundwater MEGATERRA Ltd. applied pump and treat method, namely groundwater pumping using extraction well, skimming of free-phase hydrocarbon, stripping of the contaminated ground water in air-stripper tower and draining of the treated groundwater into a drainage ditch. In the centre of the plume we established an extraction well with 300 mm diameter in a 500 mm borehole. Peristaltic skimmer pump was used inside the extraction well to remove the free phase petrol from the ground water surface.Because of the intense volatility of the pollutant we applied aeration (stripping) technology. The extracted contaminated groundwater was cleaned in air-stripper equipment being able to eliminate efficiently the volatile pollutants from the water. The aeration tower is a compact cylindrical shaped column with 650 mm in diameter. Its height depends on the pollutant's type The

  17. A Lyapunov Function Based Remedial Action Screening Tool Using Real-Time Data

    Energy Technology Data Exchange (ETDEWEB)

    Mitra, Joydeep [Michigan State Univ., East Lansing, MI (United States); Ben-Idris, Mohammed [Univ. of Nevada, Reno, NV (United States); Faruque, Omar [Florida State Univ., Tallahassee, FL (United States); Backhaus, Scott [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Deb, Sidart [LCG Consulting, Los Altos, CA (United States)

    2016-03-30

    This report summarizes the outcome of a research project that comprised the development of a Lyapunov function based remedial action screening tool using real-time data (L-RAS). The L-RAS is an advanced computational tool that is intended to assist system operators in making real-time redispatch decisions to preserve power grid stability. The tool relies on screening contingencies using a homotopy method based on Lyapunov functions to avoid, to the extent possible, the use of time domain simulations. This enables transient stability evaluation at real-time speed without the use of massively parallel computational resources. The project combined the following components. 1. Development of a methodology for contingency screening using a homotopy method based on Lyapunov functions and real-time data. 2. Development of a methodology for recommending remedial actions based on the screening results. 3. Development of a visualization and operator interaction interface. 4. Testing of screening tool, validation of control actions, and demonstration of project outcomes on a representative real system simulated on a Real-Time Digital Simulator (RTDS) cluster. The project was led by Michigan State University (MSU), where the theoretical models including homotopy-based screening, trajectory correction using real-time data, and remedial action were developed and implemented in the form of research-grade software. Los Alamos National Laboratory (LANL) contributed to the development of energy margin sensitivity dynamics, which constituted a part of the remedial action portfolio. Florida State University (FSU) and Southern California Edison (SCE) developed a model of the SCE system that was implemented on FSU's RTDS cluster to simulate real-time data that was streamed over the internet to MSU where the L-RAS tool was executed and remedial actions were communicated back to FSU to execute stabilizing controls on the simulated system. LCG Consulting developed the visualization

  18. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1993-08-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado

  19. Natural radioactivity in groundwater--a review.

    Science.gov (United States)

    Dinh Chau, Nguyen; Dulinski, Marek; Jodlowski, Pawel; Nowak, Jakub; Rozanski, Kazimierz; Sleziak, Monika; Wachniew, Przemyslaw

    2011-12-01

    The issue of natural radioactivity in groundwater is reviewed, with emphasis on those radioisotopes which contribute in a significant way to the overall effective dose received by members of the public due to the intake of drinking water originating from groundwater systems. The term 'natural radioactivity' is used in this context to cover all radioactivity present in the environment, including man-made (anthropogenic) radioactivity. Comprehensive discussion of radiological aspects of the presence of natural radionuclides in groundwater, including an overview of current regulations dealing with radioactivity in drinking water, is provided. The presented data indicate that thorough assessments of the committed doses resulting from the presence of natural radioactivity in groundwater are needed, particularly when such water is envisaged for regular intake by infants. They should be based on a precise determination of radioactivity concentration levels of the whole suite of radionuclides, including characterisation of their temporal variability. Equally important is a realistic assessment of water intake values for specific age groups. Only such an evaluation may provide the basis for possible remedial actions.

  20. Progress and problems in the Formerly Utilized Sites Remedial Action Program and Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Fiore, J.J.; Turi, G.P.

    1988-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to identify, evaluate, and as appropriate, conduct remedial actions at sites used in the early years of nuclear energy development by the Manhattan Engineer District and the Atomic Energy Commission (AEC). This program currently has 29 sites and is evaluating 350 other sites for possible inclusion in the program. Another remedial action program in the Department of Energy's (DOE) Division of Facility and Site Decommissioning Projects is the Surplus Facilities Management Program (SFMP). The SFMP involves the safe management, decontamination and disposal of surplus DOE contaminated facilities which were not related to defense activities. There are currently 33 projects at 15 different sites in the program. These two programs have made steady progress over the last 10 or so years in cleaning up sites so that they can be reused or released for unrestricted use. Work has been completed at 8 of the FUSRAP sites and three of the SFMP sites