WorldWideScience

Sample records for ground tests contractor

  1. 48 CFR 509.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Testing performed by the... ADMINISTRATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 509.308-1 Testing performed by the contractor. In FSS solicitations and contracts that will require...

  2. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) [Contracting Officer shall...

  3. TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

    Science.gov (United States)

    Young, Roy M.; Adams, Charles L.

    2010-01-01

    The NASA In-Space Propulsion Technology (ISPT) Projects Office sponsored two separate, independent solar sail system design and development demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L' Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators.

  4. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  5. Construction management at the SP-100 ground engineering system test site

    International Nuclear Information System (INIS)

    Burchell, G.P.; Wilson, L.R.

    1991-01-01

    Contractors under the U.S. Department of Energy management have implemented a comprehensive approach to the management of design and construction of the complex facility modifications at the SP-100 Ground Engineering System Test Site on the Hanford Reservation. The SP-100 Test Site employs a multi-organizational integrated management approach with clearly defined responsibilities to assure success. This approach allows for thorough planning and analysis before the project kick off, thus minimizing the number and magnitude of problems which arise during the course of the project. When combined with a comprehensive cost and schedule/project management reporting system the problems which do occur are recognized early enough to assure timely intervention and resolution

  6. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  7. 49 CFR 199.245 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...

  8. 49 CFR 199.115 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...

  9. SSE software test management STM capability: Using STM in the Ground Systems Development Environment (GSDE)

    Science.gov (United States)

    Church, Victor E.; Long, D.; Hartenstein, Ray; Perez-Davila, Alfredo

    1992-01-01

    This report is one of a series discussing configuration management (CM) topics for Space Station ground systems software development. It provides a description of the Software Support Environment (SSE)-developed Software Test Management (STM) capability, and discusses the possible use of this capability for management of developed software during testing performed on target platforms. This is intended to supplement the formal documentation of STM provided by the SEE Project. How STM can be used to integrate contractor CM and formal CM for software before delivery to operations is described. STM provides a level of control that is flexible enough to support integration and debugging, but sufficiently rigorous to insure the integrity of the testing process.

  10. Contractor evaluations in the contractor selection process.

    Science.gov (United States)

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  11. 48 CFR 9.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... the contractor. (a)(1) The contracting officer shall insert the clause at 52.209-3, First Article... it is intended that the contract require (i) first article approval and (ii) that the contractor be... produce the first article and the production quantity at the same facility, the contracting officer shall...

  12. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  13. Contractor safety

    International Nuclear Information System (INIS)

    Blanton, M.L.; Montgomery, E.W.

    1991-01-01

    The recent trend in the United States and Shell Oil Company EandP has been to increase use of contractors to do specialized work. Many companies now use contractors almost exclusively for operations such as drilling, well workovers, construction, and many specialty and routine maintenance tasks. Today, approximately 75% of Shell Oil Company's actual operating work force in EandP is contract. Clearly, HSandE considerations must become an increasingly important part of the contractor selection process. This paper reports on the Shell Oil Company's evolution from a bidder selection process to a program of Matching Owner and Contractor. Well has begun to expand efforts to make better assessments of contractor's HSandE capabilities and values in pre-bid considerations. Focus is on pre-bid evaluations to select contractors that have strong HSandE commitments and values. Contractor safety performance in this industry must be brought up to the same standards as operating companies. In Shell Oil EandP is only willing to contractors who can and are willing to do that

  14. 78 FR 71036 - Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting...

    Science.gov (United States)

    2013-11-27

    ... PHMSA-2013-0248] Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting; and Obtaining Drug and Alcohol Management Information System Sign-In Information AGENCY: Pipeline... Management Information System (MIS) Data; and New Method for Operators to Obtain User Name and Password for...

  15. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  16. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-10-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor`s status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  17. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Scapuzzi, D.

    1990-06-01

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  18. Contractor management

    NARCIS (Netherlands)

    Ustailieva, E.; Starren, A.

    2013-01-01

    Companies function more and more in networks (i.e. contractor chains with contractors, suppliers and/or other companies. This asks for several companies/parties to work together to get the work done. Working in contractor chains is very common in sectors like maintenance, construction, cleaning, and

  19. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    International Nuclear Information System (INIS)

    Bodie, J.S.; Haymour, J.

    1999-01-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts

  20. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-07-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  1. Technical assistance contractor management plan: Surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC's mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel

  2. Technical assistance contractor management plan: Surface and ground water

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  3. Preliminary site design for the SP-100 ground engineering test

    International Nuclear Information System (INIS)

    Cox, C.M.; Miller, W.C.; Mahaffey, M.K.

    1986-04-01

    In November, 1985, Hanford was selected by the Department of Energy (DOE) as the preferred site for a full-scale test of the integrated nuclear subsystem for SP-100. The Hanford Engineering Development Laboratory, operated by Westinghouse Hanford Company, was assigned as the lead contractor for the Test Site. The nuclear subsystem, which includes the reactor and its primary heat transport system, will be provided by the System Developer, another contractor to be selected by DOE in late FY-1986. In addition to reactor operations, test site responsibilities include preparation of the facility plus design, procurement and installation of a vacuum chamber to house the reactor, a secondary heat transport system to dispose of the reactor heat, a facility control system, and postirradiation examination. At the conclusion of the test program, waste disposal and facility decommissioning are required. The test site must also prepare appropriate environmental and safety evaluations. This paper summarizes the preliminary design requirements, the status of design, and plans to achieve full power operation of the test reactor in September, 1990

  4. Hot Ground Vibration Tests

    Data.gov (United States)

    National Aeronautics and Space Administration — Ground vibration tests or modal surveys are routinely conducted to support flutter analysis for subsonic and supersonic vehicles. However, vibration testing...

  5. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Science.gov (United States)

    2010-10-01

    ... direct contractor (Spain). 252.229-7004 Section 252.229-7004 Federal Acquisition Regulations System... contractor (Spain). As prescribed in 229.402-70(d), use the following clause: Status of Contractor as a Director Contractor (Spain) (JUN 1997) (a) “Direct Contractor,” as used in this clause, means an individual...

  6. Advanced Testing Method for Ground Thermal Conductivity

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xiaobing [ORNL; Clemenzi, Rick [Geothermal Design Center Inc.; Liu, Su [University of Tennessee (UT)

    2017-04-01

    A new method is developed that can quickly and more accurately determine the effective ground thermal conductivity (GTC) based on thermal response test (TRT) results. Ground thermal conductivity is an important parameter for sizing ground heat exchangers (GHEXs) used by geothermal heat pump systems. The conventional GTC test method usually requires a TRT for 48 hours with a very stable electric power supply throughout the entire test. In contrast, the new method reduces the required test time by 40%–60% or more, and it can determine GTC even with an unstable or intermittent power supply. Consequently, it can significantly reduce the cost of GTC testing and increase its use, which will enable optimal design of geothermal heat pump systems. Further, this new method provides more information about the thermal properties of the GHEX and the ground than previous techniques. It can verify the installation quality of GHEXs and has the potential, if developed, to characterize the heterogeneous thermal properties of the ground formation surrounding the GHEXs.

  7. Modelling Client Satisfaction Levels: The Impact of Contractor Performance

    Directory of Open Access Journals (Sweden)

    Robby Soetanto

    2012-11-01

    Full Text Available The performance of contractors is known to be a key determinant of client satisfaction.Here, using factor analysis, clients’ satisfaction is defined in several dimensions. Based onclients’ assessment of contractor performance, a number of satisfaction models developedusing the multiple regression (MR technique are presented. The models identify arange of variables encompassing contractor performance, project performance and respondent(i.e. client attributes as useful predictors of satisfaction levels. Contractor performanceattributes were found to be of utmost importance indicating that clientsatisfaction levels are mainly dependent on the performance of the contractor. Furthermore,findings suggest that subjectivity is to some extent prevalent in clients’ performanceassessment. The models demonstrate accurate and reliable predictive power as confirmedby validation tests. Contractors could use the models to help improve their performanceleading to more satisfied clients. This would also promote the development ofharmonious working relationships within the construction project coalition.

  8. From demand driven contractor selection towards value driven contractor selection

    NARCIS (Netherlands)

    Walraven, A.R.; Vries, de B.

    2009-01-01

    The procurement of a construction contractor should consider more aspects than only cost or price. Taking value and price into account to select the ‘best value for money’ bid results in adopting a structured multicriteria approach. An alternative contractor selection method is presented, which

  9. Ground test for vibration control demonstrator

    Science.gov (United States)

    Meyer, C.; Prodigue, J.; Broux, G.; Cantinaud, O.; Poussot-Vassal, C.

    2016-09-01

    In the objective of maximizing comfort in Falcon jets, Dassault Aviation is developing an innovative vibration control technology. Vibrations of the structure are measured at several locations and sent to a dedicated high performance vibration control computer. Control laws are implemented in this computer to analyse the vibrations in real time, and then elaborate orders sent to the existing control surfaces to counteract vibrations. After detailing the technology principles, this paper focuses on the vibration control ground demonstration that was performed by Dassault Aviation in May 2015 on Falcon 7X business jet. The goal of this test was to attenuate vibrations resulting from fixed forced excitation delivered by shakers. The ground test demonstrated the capability to implement an efficient closed-loop vibration control with a significant vibration level reduction and validated the vibration control law design methodology. This successful ground test was a prerequisite before the flight test demonstration that is now being prepared. This study has been partly supported by the JTI CleanSky SFWA-ITD.

  10. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  11. Single-event effect ground test issues

    International Nuclear Information System (INIS)

    Koga, R.

    1996-01-01

    Ground-based single event effect (SEE) testing of microcircuits permits characterization of device susceptibility to various radiation induced disturbances, including: (1) single event upset (SEU) and single event latchup (SEL) in digital microcircuits; (2) single event gate rupture (SEGR), and single event burnout (SEB) in power transistors; and (3) bit errors in photonic devices. These characterizations can then be used to generate predictions of device performance in the space radiation environment. This paper provides a general overview of ground-based SEE testing and examines in critical depth several underlying conceptual constructs relevant to the conduct of such tests and to the proper interpretation of results. These more traditional issues are contrasted with emerging concerns related to the testing of modern, advanced microcircuits

  12. 76 FR 39015 - Contractor Performance Information

    Science.gov (United States)

    2011-07-05

    ...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...

  13. Contractor Selection in Saudi Arabia

    OpenAIRE

    M. A. Bajaber; M. A. Taha

    2012-01-01

    Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few ...

  14. 48 CFR 46.105 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  15. On the relationship between financial measures and contractor pricing strategy: Empirical tests in the defense aerospace industry

    OpenAIRE

    Moses, O. Douglas

    1987-01-01

    This report includes two separate but related empirical studies of the relationship between financial measures for defense aerospace contractors and pricing strategies adopted by contractors. Two pricing strategies are identified: skimming and penetration. Collectively the findings indicate that the adoption of a particular pricing strategy is associated with the financial condition of the contractor as reflected in measures of risk, asset utilization and organizational slack. Keywords: Finan...

  16. An assessment of testing requirement impacts on nuclear thermal propulsion ground test facility design

    International Nuclear Information System (INIS)

    Shipers, L.R.; Ottinger, C.A.; Sanchez, L.C.

    1993-01-01

    Programs to develop solid core nuclear thermal propulsion (NTP) systems have been under way at the Department of Defense (DoD), the National Aeronautics and Space Administration (NASA), and the Department of Energy (DOE). These programs have recognized the need for a new ground test facility to support development of NTP systems. However, the different military and civilian applications have led to different ground test facility requirements. The Department of Energy (DOE) in its role as landlord and operator of the proposed research reactor test facilities has initiated an effort to explore opportunities for a common ground test facility to meet both DoD and NASA needs. The baseline design and operating limits of the proposed DoD NTP ground test facility are described. The NASA ground test facility requirements are reviewed and their potential impact on the DoD facility baseline is discussed

  17. 7 CFR 1726.27 - Contractor's bonds.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall be used when a contractor's bond is required by RUS Forms 200, 257...

  18. 48 CFR 47.207-5 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...

  19. 48 CFR 18.102 - Central contractor registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...

  20. Ground testing of an SP-100 prototypic reactor

    International Nuclear Information System (INIS)

    Motwani, K.; Pflasterer, G.R.; Upton, H.; Lazarus, J.D.; Gluck, R.

    1988-01-01

    SP-100 is a space power system which is being developed by GE to meet future space electrical power requirements. The ground testing of an SP-100 prototypic reactor system will be conducted at the Westinghouse Hanford Company site located at Richland, Washington. The objective of this test is to demonstrate the performance of a full scale prototypic reactor system, including the reactor, control system and flight shield. The ground test system is designed to simulate the flight operating conditions while meeting all the necessary nuclear safety requirements in a gravity environment. The goal of the reactor ground test system is to establish confidence in the design maturity of the SP-100 space reactor power system and resolve the technical issues necessary for the development of a flight mission design

  1. 48 CFR 1845.502 - Contractor responsibility.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor responsibility. 1845.502 Section 1845.502 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Contractors 1845.502 Contractor responsibility. ...

  2. 48 CFR 1609.471 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...

  3. 48 CFR 1602.170-4 - Contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...

  4. 48 CFR 752.7013 - Contractor-mission relationships.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...

  5. 30 CFR 45.4 - Independent contractor register.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  6. 48 CFR 852.237-70 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...

  7. 48 CFR 1509.170-8 - Contractor Performance Report.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  8. 48 CFR 52.241-5 - Contractor's Facilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Facilities....241-5 Contractor's Facilities. As prescribed in 41.501(c)(4), insert a clause substantially the same as the following: Contractor's Facilities (FEB 1995) (a) The Contractor, at its expense, unless...

  9. 48 CFR 52.247-28 - Contractor's Invoices.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed by...

  10. 14 CFR 1245.108 - License to contractor.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  11. 48 CFR 725.703 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...

  12. 48 CFR 33.207 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor certification... CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 33.207 Contractor certification. (a) Contractors shall provide the certification specified in paragraph (c) of this section when...

  13. History of ground motion programs at the Nevada Test Site

    International Nuclear Information System (INIS)

    Banister, J.R.

    1984-01-01

    Some measurements were made in the atmospheric testing era, but the study of ground motion from nuclear tests became of wider interest after the instigation of underground testing. The ground motion generated by underground nuclear test has been investigated for a number of reasons including understanding basic phenomena, operational and safety concerns, yield determination, stimulation of earthquake concerns, and developing methods to aid in treaty verifications. This history of ground motion programs will include discussing early studies, high yield programs, Peaceful Nuclear Explosions tests, and some more recent developments. 6 references, 10 figures

  14. 48 CFR 1845.502-70 - Contractor-acquired property.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...

  15. 48 CFR 1252.242-71 - Contractor testimony.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony. 1252... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to...

  16. 40 CFR 35.6600 - Contractor claims.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contractor claims. 35.6600 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6600 Contractor claims. (a) General... prepared by the contractor to support a claim against the recipient; and (4) The award official determines...

  17. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Science.gov (United States)

    2010-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  18. BUSTED BUTTE TEST FACILITY GROUND SUPPORT CONFIRMATION ANALYSIS

    International Nuclear Information System (INIS)

    Bonabian, S.

    1998-01-01

    The main purpose and objective of this analysis is to confirm the validity of the ground support design for Busted Butte Test Facility (BBTF). The highwall stability and adequacy of highwall and tunnel ground support is addressed in this analysis. The design of the BBTF including the ground support system was performed in a separate document (Reference 5.3). Both in situ and seismic loads are considered in the evaluation of the highwall and the tunnel ground support system. In this analysis only the ground support designed in Reference 5.3 is addressed. The additional ground support installed (still work in progress) by the constructor is not addressed in this analysis. This additional ground support was evaluated by the A/E during a site visit and its findings and recommendations are addressed in this analysis

  19. Contractor Performance Assessment Reporting System

    Data.gov (United States)

    US Agency for International Development — CPARS is a web-based system used to input data on contractor performance. Reports from the system are used as an aid in awarding contracts to contractors that...

  20. 48 CFR 970.4402 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  1. Hydrogen Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-05-16

    This volume highlights the scientific content of the 2006 Hydrogen Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) on behalf of the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). Hydrogen Contractors Meeting held from May 16-19, 2006 at the Crystal Gateway Marriott Hotel Arlington, Virginia. This meeting is the second in a series of research theme-based Contractors Meetings sponsored by DMS&E held in conjunction with our counterparts in the Office of Energy Efficiency and Renewable Energy (EERE) and the first with the Hydrogen, Fuel Cells and Infrastructure Technologies Program. The focus of this year’s meeting is BES funded fundamental research underpinning advancement of hydrogen storage. The major goals of these research efforts are the development of a fundamental scientific base in terms of new concepts, theories and computational tools; new characterization capabilities; and new materials that could be used or mimicked in advancing capabilities for hydrogen storage.

  2. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  3. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  4. 48 CFR 970.5244-1 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  5. 48 CFR 52.204-7 - Central Contractor Registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Central Contractor....204-7 Central Contractor Registration. As prescribed in 4.1105, use the following clause: Central Contractor Registration (APR 2008) (a) Definitions. As used in this clause— Central Contractor Registration...

  6. Environmental liability and the independent contractor

    International Nuclear Information System (INIS)

    Gilmour, B.S.

    1999-01-01

    The provisions of the Environmental Protection and Enhancement Act (EPEA) regarding the relationship between a company and an independent contractor were reviewed. The EPEA was introduced in September 1993 and significantly altered the environmental laws in the province of Alberta. The provisions of the EPEA that apply to the petroleum industry are conservation and reclamation as well as provisions concerning release of substances, contaminated sites and penalties. Companies that pollute may be held liable for reclamation, even if the work was carried out by an independent contractor and despite the fact that the independent contractor is not an employee of the company. Under the current EPEA laws, companies may not be able to effectively shift responsibility for environmental liabilities to independent contractors even where the contractor was negligent. This paper presented suggestions regarding contractor agreements and due diligence to help minimize the risk of liability to companies. The paper also discussed the following two types of liabilities under the EPEA's harmful substances section: (1) the obligation to clean up an affected area, and (2) fines and penalties that may be imposed when an offence is committed

  7. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  8. Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Adair, Kristin Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Turgeon, Jennifer [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). High Confidence System Environments

    2016-04-01

    The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

  9. 40 CFR 68.87 - Contractors.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... specialty work on or adjacent to a covered process. It does not apply to contractors providing incidental...

  10. 78 FR 11164 - Policy on Contractor Profits

    Science.gov (United States)

    2013-02-15

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System Policy on Contractor Profits AGENCY... Authorization Act for Fiscal Year 2013. Section 804, Department of Defense Policy on Contractor Profits... modifications to such guidelines that are necessary to ensure an appropriate link between contractor profit and...

  11. 48 CFR 46.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  12. 48 CFR 970.5203-3 - Contractor's organization.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  13. 48 CFR 450.303-1 - Contractor requests.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...

  14. 48 CFR 2427.305-2 - Follow-up by contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  15. Ground test facility for nuclear testing of space reactor subsystems

    International Nuclear Information System (INIS)

    Quapp, W.J.; Watts, K.D.

    1985-01-01

    Two major reactor facilities at the INEL have been identified as easily adaptable for supporting the nuclear testing of the SP-100 reactor subsystem. They are the Engineering Test Reactor (ETR) and the Loss of Fluid Test Reactor (LOFT). In addition, there are machine shops, analytical laboratories, hot cells, and the supporting services (fire protection, safety, security, medical, waste management, etc.) necessary to conducting a nuclear test program. This paper presents the conceptual approach for modifying these reactor facilities for the ground engineering test facility for the SP-100 nuclear subsystem. 4 figs

  16. 32 CFR 989.23 - Contractor prepared documents.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractor prepared documents. 989.23 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force... should reflect on the cover sheet they are an Air Force document. Contractor preparation information...

  17. 6 CFR 25.8 - Government contractor Defense.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  18. 42 CFR 455.202 - Limitation on contractor liability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Limitation on contractor liability. 455.202 Section... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity employed... contractor will not be held to have violated any criminal law and will not be held liable in any civil action...

  19. Technical approach for the management of UMTRA ground water investigation-derived wastes

    International Nuclear Information System (INIS)

    1994-02-01

    During characterization, remediation, or monitoring activities of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project, ground water samples are collected to assess the extent and amount of waterborne contamination that might have come from the mill tailings. This sampling sometimes occurs in contaminated areas where ground water quality has been degraded. Ground water sampling activities may result in field-generated wastes that must be disposed of in a manner protective of human health and the environment. During ground water sampling, appropriate measures must be taken to dispose of presampling purge water and well development water that is pumped to flush out any newly constructed wells. Additionally, pumping tests may produce thousands of gallons of potentially contaminated ground water that must be properly managed. In addition to the liquid wastes, there is the potential for bringing contaminated soils to the ground surface during the drilling and installation of water wells in areas where the subsurface soils may be contaminated. These soils must be properly managed as well. This paper addresses the general technical approach that the UMTRA Project will follow in managing field-generated wastes from well drilling, development, sampling, and testing. It will provide guidance for the preparation of Technical Assistance Contractor (TAC) Standard Operating Procedures (SOP) for the management and disposal of field-generated wastes from ground water monitoring and remediation activities

  20. Space Shuttle Boundary Layer Transition Flight Experiment Ground Testing Overview

    Science.gov (United States)

    Berger, Karen T.; Anderson, Brian P.; Campbell, Charles H.

    2014-01-01

    In support of the Boundary Layer Transition (BLT) Flight Experiment (FE) Project in which a manufactured protuberance tile was installed on the port wing of Space Shuttle Orbiter Discovery for STS-119, STS- 128, STS-131 and STS-133 as well as Space Shuttle Orbiter Endeavour for STS-134, a significant ground test campaign was completed. The primary goals of the test campaign were to provide ground test data to support the planning and safety certification efforts required to fly the flight experiment as well as validation for the collected flight data. These test included Arcjet testing of the tile protuberance, aerothermal testing to determine the boundary layer transition behavior and resultant surface heating and planar laser induced fluorescence (PLIF) testing in order to gain a better understanding of the flow field characteristics associated with the flight experiment. This paper provides an overview of the BLT FE Project ground testing. High-level overviews of the facilities, models, test techniques and data are presented, along with a summary of the insights gained from each test.

  1. Control of subcontractors by civil works contractor for a nuclear power plant

    International Nuclear Information System (INIS)

    Jiang Xinguo

    1995-10-01

    The civil works (CW) contractor is responsible for managing its subcontractors according to the requirements of quality assurance programme including the establishment of organization, quality assurance management, document control, material control, construction schedule control, inspection and test control, non-conformance control, corrective actions and executive technical files. The responsibilities of the plant owner, the CW contractor and its subcontractors in relation to performing their functions in the above-mentioned activities are described in detail

  2. Control of subcontractors by civil works contractor for a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Xinguo, Jiang [Huaxing Construction Company, Yizheng, JS (China)

    1995-10-01

    The civil works (CW) contractor is responsible for managing its subcontractors according to the requirements of quality assurance programme including the establishment of organization, quality assurance management, document control, material control, construction schedule control, inspection and test control, non-conformance control, corrective actions and executive technical files. The responsibilities of the plant owner, the CW contractor and its subcontractors in relation to performing their functions in the above-mentioned activities are described in detail.

  3. Military Contractors - Too Much Dependence

    National Research Council Canada - National Science Library

    Hill, Nathan E

    2008-01-01

    .... There is undoubtedly a need for military contractors and there are numerous positive arguments in their favor. However, the negative arguments have not been highlighted enough recently and the scales are now out of balance. The intent of this research paper is to encourage the U.S. military to rebalance the scales and curb the over-reliance on contractors.

  4. The responsibility of the contractor for project deficiencies

    Directory of Open Access Journals (Sweden)

    Pušac Jovana

    2011-01-01

    Full Text Available In this paper the author analyzes a civil law responsibility of the Contractor for project deficiencies resulting in reduced quality of the construction, i.e. not affecting its solidity. Primary obligation of the Contractor is to perform works in compliance with professional standards, the contract and the approved project. The Contractor cannot change the approved project at will, even when he has designed it. Hence, the question must be raised of the obligation of the Contractor to strictly abide by the project, assigned to him by the Authority, regardless of evident deficiencies of the Project and of his responsibility for performing works in compliance with the said project resulting in deficiencies in the construction, that is construction works. If the latter hypothesis is correct, then it must be established what deficiencies in the project fall under the responsibility of the Contractor (visible or hidden, i.e. the issue of dividing responsibility between the Project Designer and the Contractor in terms of the project deficiencies must be set up and solved. Finally, it is also important to define the realization of rights and duties of the Contractor in case the Contractor has to recede from the Project. In this paper the author tries to offer detail and complete answers to raised questions.

  5. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employee travel... Contractor employee travel discounts. As prescribed in 951.7002, insert the following clause: Contractor Employee Travel Discounts (AUG 2009) (a) The Contractor shall take advantage of travel discounts offered to...

  6. 48 CFR 245.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory. ...

  7. 48 CFR 1553.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  8. 48 CFR 45.501 - Prime contractor alternate locations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  9. 48 CFR 1852.209-72 - Composition of the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 1852.209-72 Section 1852.209-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one legal...

  10. 48 CFR 53.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  11. 48 CFR 2936.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...

  12. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...

  13. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...

  14. 48 CFR 32.909 - Contractor inquiries.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inquiries. 32.909 Section 32.909 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 32.909 Contractor inquiries. (a) Direct questions...

  15. National Radon Contractor Proficiency Program. Proficiency report: Supplement

    International Nuclear Information System (INIS)

    1991-02-01

    The report, a supplement to the RCP Proficiency Report, will further assist governmental officials in providing advice to the public on the selection of proficient radon mitigation contractors. These reports list 1,123 contractors who have met the requirements of the RCP Program as of December 15, 1990. The Proficiency Report provides information on each contractor's name, RCP identification number, company name, address, phone number, and geographic service area. The report provides two additional tables, indexed by company name and by RCP identification number. The report is intended to help users quickly identify a proficient contractor if only the company name is known, or to verify which contractor is associated with a particular ID number

  16. Contractor Software Charges

    National Research Council Canada - National Science Library

    Granetto, Paul

    1994-01-01

    .... Examples of computer software costs that contractors charge through indirect rates are material management systems, security systems, labor accounting systems, and computer-aided design and manufacturing...

  17. 48 CFR 2452.251-70 - Contractor employee travel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT 1999...

  18. 48 CFR 3036.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...

  19. 48 CFR 2152.215-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... PRECONTRACT PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 2152.215-70 Contractor records retention. As prescribed in 2115.071, insert the following clause: Contractor Records Retention (OCT 2005...

  20. 48 CFR 36.506 - Superintendence by the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 36.506 Section 36.506 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Superintendence by the contractor. The contracting officer shall insert the clause at 52.236-6, Superintendence by the Contractor, in solicitations and contracts when a fixed-price construction contract or a fixed...

  1. 48 CFR 1652.204-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... of FEHBP Clauses 1652.204-70 Contractor records retention. As prescribed in 1604.705 the following clause will be inserted in all FEHB Program contracts. Contractor Records Retention (JUL 2005...

  2. 48 CFR 4.102 - Contractor's signature.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor's signature. 4.102 Section 4.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Contract Execution 4.102 Contractor's signature. (a) Individuals. A contract with an...

  3. 48 CFR 253.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  4. Hanford Site ground-water monitoring for 1990

    International Nuclear Information System (INIS)

    Evans, J.C.; Bryce, R.W.; Bates, D.J.

    1992-06-01

    The Pacific Northwest Laboratory monitors ground-water quality across the Hanford Site for the US Department of Energy (DOE) to assess the impact of Site operations on the environment. Monitoring activities were conducted to determine the distribution of mobile radionuclides and identify chemicals present in ground water as a result of Site operations and whenever possible, relate the distribution of these constituents to Site operations. To comply with the Resource Conservation and Recovery Act, additional monitoring was conducted at individual waste sites by the Site Operating Contractor, Westinghouse Hanford Company (WHC), to assess the impact that specific facilities have had on ground-water quality. Six hundred and twenty-nine wells were sampled during 1990 by all Hanford ground-water monitoring activities

  5. 30 CFR 875.20 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 875.20 Section 875.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION CERTIFICATION AND NONCOAL RECLAMATION § 875.20 Contractor eligibility. Every...

  6. 30 CFR 874.16 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 874.16 Section 874.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.16 Contractor eligibility. To receive...

  7. 7 CFR 3015.183 - Access to contractor records.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Access to contractor records. 3015.183 Section 3015... contractor records. The Attachment 0 requires recipients to include in specified kinds of contracts a provision for access to the contractor's records by the recipient and the Federal government. The following...

  8. 48 CFR 3052.204-71 - Contractor employee access.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contractor employee access... CLAUSES Text of Provisions and Clauses 3052.204-71 Contractor employee access. As prescribed in (HSAR) 48...: Contractor Employee Access (JUN 2006) (a) “Sensitive Information,” as used in this Chapter, means any...

  9. Guidance on the Stand Down, Mothball, and Reactivation of Ground Test Facilities

    Science.gov (United States)

    Volkman, Gregrey T.; Dunn, Steven C.

    2013-01-01

    The development of aerospace and aeronautics products typically requires three distinct types of testing resources across research, development, test, and evaluation: experimental ground testing, computational "testing" and development, and flight testing. Over the last twenty plus years, computational methods have replaced some physical experiments and this trend is continuing. The result is decreased utilization of ground test capabilities and, along with market forces, industry consolidation, and other factors, has resulted in the stand down and oftentimes closure of many ground test facilities. Ground test capabilities are (and very likely will continue to be for many years) required to verify computational results and to provide information for regimes where computational methods remain immature. Ground test capabilities are very costly to build and to maintain, so once constructed and operational it may be desirable to retain access to those capabilities even if not currently needed. One means of doing this while reducing ongoing sustainment costs is to stand down the facility into a "mothball" status - keeping it alive to bring it back when needed. Both NASA and the US Department of Defense have policies to accomplish the mothball of a facility, but with little detail. This paper offers a generic process to follow that can be tailored based on the needs of the owner and the applicable facility.

  10. Review of Nuclear Thermal Propulsion Ground Test Options

    Science.gov (United States)

    Coote, David J.; Power, Kevin P.; Gerrish, Harold P.; Doughty, Glen

    2015-01-01

    High efficiency rocket propulsion systems are essential for humanity to venture beyond the moon. Nuclear Thermal Propulsion (NTP) is a promising alternative to conventional chemical rockets with relatively high thrust and twice the efficiency of highest performing chemical propellant engines. NTP utilizes the coolant of a nuclear reactor to produce propulsive thrust. An NTP engine produces thrust by flowing hydrogen through a nuclear reactor to cool the reactor, heating the hydrogen and expelling it through a rocket nozzle. The hot gaseous hydrogen is nominally expected to be free of radioactive byproducts from the nuclear reactor; however, it has the potential to be contaminated due to off-nominal engine reactor performance. NTP ground testing is more difficult than chemical engine testing since current environmental regulations do not allow/permit open air testing of NTP as was done in the 1960's and 1970's for the Rover/NERVA program. A new and innovative approach to rocket engine ground test is required to mitigate the unique health and safety risks associated with the potential entrainment of radioactive waste from the NTP engine reactor core into the engine exhaust. Several studies have been conducted since the ROVER/NERVA program in the 1970's investigating NTP engine ground test options to understand the technical feasibility, identify technical challenges and associated risks and provide rough order of magnitude cost estimates for facility development and test operations. The options can be divided into two distinct schemes; (1) real-time filtering of the engine exhaust and its release to the environment or (2) capture and storage of engine exhaust for subsequent processing.

  11. Determinants of contractor pricing strategy

    OpenAIRE

    Moses, O. Douglas

    1988-01-01

    This paper investigates pricing strategies used by major defense contractors. Two pricing strategies are identified and discussed: penetration, which calls for a relatively low initial price followed by little reduction in price over time, and skimming, which calls for a relatively high initial price coupled with greater reduction in price over time. It is argued that contractor pricing strategy will depend on features of the defense program under consideration and featur...

  12. A practical due diligence strategy for managing the safety of contractors

    International Nuclear Information System (INIS)

    Catton, C.

    1998-01-01

    Ontario Hydro's Fossil Business has developed and implemented a practical program to ensure that the due diligence requirements for contractors are met, particularly in the health and safety area. Companies in the power generation business are hiring contractors to protect their competitive potential by having them perform specialty work outside the core business of generating electricity. The reasons behind this trend, and the need for companies to develop comprehensive contractor safety management systems to avoid legislative liability and cost overruns, and to have contractors work safely, are examined. The main elements of Ontario Hydro's Fossil Business Contractor Safety Management Program (contractor safety policy, contractor safety manual, contractor safety training, and a contractor safety performance database) are discussed. 2 figs., 2 appendices

  13. Key drivers for informal project coordination among sub-contractors

    DEFF Research Database (Denmark)

    Aagaard, Annabeth; Eskerod, Pernille; Madsen, Erik Skov

    2015-01-01

    understandings. Still though, many sub-contractors choose not to coordinate informally. The purpose of this paper is to identify drivers that enhance or inhibits informal coordination in projects. A qualitative, explorative case study approach was applied. Fifteen SME sub-contractors within the offshore wind...... are massive. Six drivers which enhance informal coordination and three drivers which inhibit informal coordination among sub-contractors in projects were identified. The findings imply that management in project-oriented organizations can enhance informal coordination across project sub-contractors...... and by facilitating trust building, by emphasizing previous collaboration successes with the sub-contractors and the possibility of future common projects, by being explicit about expectations on informal coordination, and by developing sub-contractor contracts that are not as tight in economic terms, but instead...

  14. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor... instructions in NASA Procedures and Guidelines (NPR) 9501.2, NASA Contractor Financial Management Reporting...

  15. 78 FR 46783 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2013-08-01

    ..., Sequence 1] RIN 9000-AM09 Federal Acquisition Regulation; Documenting Contractor Performance AGENCY... the Contractor Performance Assessment Reporting System (CPARS), the single Governmentwide past... Procurement Policy (OFPP) memorandum entitled ``Improving the Use of Contractor Performance Information...

  16. Private Security Contractors in Darfur

    DEFF Research Database (Denmark)

    Leander, Anna

    2006-01-01

    This article argues that the role of Private Security Contractors in Darfur reflects and reinforces neo-liberal governmentality in contemporary security governance. It is an argument (in line with other articles in this special issue) which is more interested in discussing how the privatization....... It underlines that governance is increasingly taking place through a set of (quasi-) markets, it is marked by entrepreneurial values, and a hands off approach to governance. We then discuss the way this overall change is reflected in and reinforced by the role of private security contractors in Darfur. Drawing...... at these processes is necessary to understand the role of private security contractors in Darfur. But more than this, practices in Darfur entrench neo-liberal governmentality in security more generally. The managerial and `de-politicizing' approach to security in Darfur displaces alternative views not only...

  17. The microelectronics and photonics test bed (MPTB) space, ground test and modeling experiments

    International Nuclear Information System (INIS)

    Campbell, A.

    1999-01-01

    This paper is an overview of the MPTB (microelectronics and photonics test bed) experiment, a combination of a space experiment, ground test and modeling programs looking at the response of advanced electronic and photonic technologies to the natural radiation environment of space. (author)

  18. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2011-06-28

    ... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...

  19. Financial management of construction contractors.

    OpenAIRE

    Lacaria, Chris J.

    1994-01-01

    The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...

  20. A guide for heating contractor; Opas laempoeyrittaejaelle

    Energy Technology Data Exchange (ETDEWEB)

    Solmio, H; Tuomi, S; Valkonen, J

    1996-12-31

    Heating contractor is eg. a forest owner, who is responsible for the heating of a commune owned school using firewood purchased from the contractor`s own forests. This is a new alternative for entrepreneurship in the countryside. This guide has been meant as an aid for persons starting heating contraction. It is supposed to be of importance for the designers of the communal energy supply, for advisors and instructors, as well as for those already started the heating contraction. The guide discusses the following topics: Why to became a heating contractor; The ways of heating contraction; operational requirements; Contracts; Conversion of a boiler plant to wood fuels; Fuel purchase; Heating work; Profitably estimation; Examples of operational solutions. The guide also includes as an example a draft contract for heating contraction

  1. National Radon Contractor Proficiency Program. Proficiency report, October 1990

    International Nuclear Information System (INIS)

    1990-10-01

    The report lists those individual contractors in the United States who have met the requirements of the Radon Contractor Proficiency (RCP) Program as of August 18, 1990. These requirements are designed to provide minimum proficiency criteria for individuals who design and supervise the installation of radon mitigation systems in buildings. (Some States have more stringent requirements as part of their radon certification programs. The States should be consulted directly for details on their programs; see Section 5 for a list of State radon contacts). The RCP Program measures the proficiency of an individual contractor, not their company. Therefore, users of the report who select a mitigation firm should ensure that the services are provided by the listed contractor. The National RCP Program does not accredit mitigation contractors, nor does it certify, recommend, or endorse participating companies. Only the listed contractor, not their company of affilation, are deemed proficient. The inclusion of a contractor in the report should not be interpreted as a certification or accreditation of the individual or affiliated company

  2. Assuring the competence of nuclear power plant contractor personnel

    International Nuclear Information System (INIS)

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  3. Assuring the competence of nuclear power plant contractor personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  4. CRYogenic Orbital TEstbed Ground Test Article Thermal Analysis

    Science.gov (United States)

    Piryk, David; Schallhorn, Paul; Walls, Laurie; Stopnitzky, Benny; Rhys, Noah; Wollen, Mark

    2012-01-01

    The purpose of this study was to anchor thermal and fluid system models to CRYOTE ground test data. The CRYOTE ground test artide was jointly developed by Innovative Engineering Solutions, United Launch Alliance and NASA KSC. The test article was constructed out of a titanium alloy tank, Sapphire 77 composite skin (similar to G10), an external secondary payload adapter ring, thermal vent system, multi layer insulation and various data acquisition instrumentation. In efforts to understand heat loads throughout this system, the GTA (filled with liquid nitrogen for safety purposes) was subjected to a series of tests in a vacuum chamber at Marshall Space Flight Center. By anchoring analytical models against test data, higher fidelity thermal environment predictions can be made for future flight articles which would eventually demonstrate critical cryogenic fluid management technologies such as system chilldown, transfer, pressure control and long term storage. Significant factors that influenced heat loads included radiative environments, multi-layer insulation performance, tank fill levels and pressures and even contact conductance coefficients. This report demonstrates how analytical thermal/fluid networks were established and includes supporting rationale for specific thermal responses.

  5. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  6. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Science.gov (United States)

    2012-02-09

    ... POSTAL SERVICE 39 CFR Part 230 Office of Inspector General; Contractor Requirements AGENCY: Postal... for contractors employed by the Office of Inspector General. The rule also emphasizes consistency in contractor selection, and clarifies the OIG's exclusive authority to set qualifications and standards for its...

  7. 48 CFR 970.0407 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  8. 48 CFR 227.7108 - Contractor data repositories.

    Science.gov (United States)

    2010-10-01

    ... repositories. 227.7108 Section 227.7108 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established when permitted by agency procedures. The contractual instrument establishing the data repository must...

  9. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  10. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  11. 48 CFR 2452.237-75 - Clearance of contractor personnel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Clearance of contractor... Clauses 2452.237-75 Clearance of contractor personnel. As prescribed in 2437.110(e), insert the following clause in solicitations and contracts. Clearance of Contractor Personnel (OCT 1999) (a) General. This...

  12. Handling effluent from nuclear thermal propulsion system ground tests

    International Nuclear Information System (INIS)

    Shipers, L.R.; Allen, G.C.

    1992-01-01

    A variety of approaches for handling effluent from nuclear thermal propulsion system ground tests in an environmentally acceptable manner are discussed. The functional requirements of effluent treatment are defined and concept options are presented within the framework of these requirements. System concepts differ primarily in the choice of fission-product retention and waste handling concepts. The concept options considered range from closed cycle (venting the exhaust to a closed volume or recirculating the hydrogen in a closed loop) to open cycle (real time processing and venting of the effluent). This paper reviews the different methods to handle effluent from nuclear thermal propulsion system ground tests

  13. Certification of ERDA contractors' packaging with respect to compliance with DOT specification 7A performance requirements

    International Nuclear Information System (INIS)

    Edling, D.A.; Griffin, J.F.

    1975-01-01

    The purpose of this study was to have one ERDA contractor: (1) compile a list of specification packagings, proposed by ERDA contractors, for shipping Type A quantities of radioactive material, and (2) analyze these packages for conformance to Specification 7A requirements. This study was divided into two phases. Phase I provides a report on those packages which could be shown, based on existing test data and engineering analyses, to conform to DOT Specification 7A packaging requirements. The results of Phase I are discussed in detail in the publication, ''Certification of AEC Contractor's Packagings With Respect to Compliance with DOT Specification 7A Performance Requirements -- Phase I Summary Report,'' D. A. Edling, H. E. Meyer and G. L. Phillabaum (Schedule 189C, May 26, 1974). The objectives of Phase II were: (1) identification of packages from Phase I for which available information was not adequate for certification. (Those specification containers used by ERDA contractors and those containers for which adequate information was available for certification are listed in the Phase I summary report.); (2) identification of specific test/engineering analysis data required; (3) generation/procurement of these data; and (4) documentation of study results for use by all ERDA contractors and private industry. The results of Phase II of the study are presented. (U.S.)

  14. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2011-12-28

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... Energy (DOE or Department) is proposing to revise existing regulations covering contractor legal... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  15. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952, and 970 RIN 1990-AA37 Contractor Legal.... ACTION: Final rule. SUMMARY: The Department of Energy revises existing regulations covering contractor... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  16. 48 CFR 52.236-6 - Superintendence by the Contractor.

    Science.gov (United States)

    2010-10-01

    ... Contractor. 52.236-6 Section 52.236-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....236-6 Superintendence by the Contractor. As prescribed in 36.506, insert the following clause: Superintendence by the Contractor (APR 1984) At all times during performance of this contract and until the work...

  17. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Science.gov (United States)

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  18. 48 CFR 1437.7001 - Contractor qualification requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  19. Ground test facilities for evaluating nuclear thermal propulsion engines and fuel elements

    International Nuclear Information System (INIS)

    Allen, G.C.; Beck, D.F.; Harmon, C.D.; Shipers, L.R.

    1992-01-01

    Interagency panels evaluating nuclear thermal propulsion development options have consistently recognized the need for constructing a major new ground test facility to support fuel element and engine testing. This paper summarizes the requirements, configuration, and design issues of a proposed ground test complex for evaluating nuclear thermal propulsion engines and fuel elements being developed for the Space Nuclear Thermal Propulsion (SNTP) program. 2 refs

  20. Advantages of the production contractor concept

    Energy Technology Data Exchange (ETDEWEB)

    Gisvold, K.M. [Golar-Nor Offshore, Trondheim (Norway)

    1994-12-31

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  1. Advantages of the production contractor concept

    International Nuclear Information System (INIS)

    Gisvold, K.M.

    1994-01-01

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  2. Definitive design status of the SP-100 Ground Engineering System Test Site

    International Nuclear Information System (INIS)

    Renkey, E.J. Jr.; Bazinet, G.D.; Bitten, E.J.; Brackenbury, P.J.; Carlson, W.F.; Irwin, J.J.; Edwards, P.A.; Shen, E.J.; Titzler, P.A.

    1989-05-01

    The SP-100 reactor will be ground tested at the SP-100 Ground Engineering System (GES) Test Site on the US Department of Energy (DOE) Hanford Site near Richland, Washington. Project direction and the flight system design evolution have resulted in a smaller reactor size and the consequential revision to Test Site features to accommodate the design changes and reduce Test Site costs. The significant design events since the completion of the Conceptual Design are discussed in this paper

  3. Definitive design status of the SP-100 Ground Engineering System Test Site

    Energy Technology Data Exchange (ETDEWEB)

    Renkey, E.J. Jr.; Bazinet, G.D.; Bitten, E.J.; Brackenbury, P.J.; Carlson, W.F.; Irwin, J.J.; Edwards, P.A.; Shen, E.J.; Titzler, P.A.

    1989-05-01

    The SP-100 reactor will be ground tested at the SP-100 Ground Engineering System (GES) Test Site on the US Department of Energy (DOE) Hanford Site near Richland, Washington. Project direction and the flight system design evolution have resulted in a smaller reactor size and the consequential revision to Test Site features to accommodate the design changes and reduce Test Site costs. The significant design events since the completion of the Conceptual Design are discussed in this paper.

  4. 14 CFR 1274.402 - Contractor acquired property.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Contractor acquired property. 1274.402 Section 1274.402 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Property § 1274.402 Contractor acquired property. As provided in § 1274.923...

  5. 48 CFR 1646.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Clauses 1646.301 Contractor inspection requirements. The clause set forth at 1652.246-70 shall be inserted...

  6. 48 CFR 645.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory. ...

  7. Large Payload Ground Transportation and Test Considerations

    Science.gov (United States)

    Rucker, Michelle A.

    2016-01-01

    Many spacecraft concepts under consideration by the National Aeronautics and Space Administration’s (NASA’s) Evolvable Mars Campaign take advantage of a Space Launch System payload shroud that may be 8 to 10 meters in diameter. Large payloads can theoretically save cost by reducing the number of launches needed--but only if it is possible to build, test, and transport a large payload to the launch site in the first place. Analysis performed previously for the Altair project identified several transportation and test issues with an 8.973 meters diameter payload. Although the entire Constellation Program—including Altair—has since been canceled, these issues serve as important lessons learned for spacecraft designers and program managers considering large payloads for future programs. A transportation feasibility study found that, even broken up into an Ascent and Descent Module, the Altair spacecraft would not fit inside available aircraft. Ground transportation of such large payloads over extended distances is not generally permitted, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 67 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA’s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels

  8. Ground Operations Demonstration Unit for Liquid Hydrogen Initial Test Results

    Science.gov (United States)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-01-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  9. Contractors on the Battlefield: Planning Considerations and Requirements

    National Research Council Canada - National Science Library

    2002-01-01

    Contractors on the Battlefield: Planning Considerations and Requirements introduces the basics and foundation for those who want to learn about the history, terminology, and process for obtaining contractor support on the battlefield...

  10. 78 FR 1256 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2013-01-08

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Final notice... issuing this notice to announce recruitment standards that construction contractors are required to follow... B) by adding a new subsection (6). This provision prohibits contractors engaged in construction...

  11. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2012-01-24

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Notice... issuing this notice to announce the recruitment standards that construction contractors are required to... contractors engaged in construction projects related to the realignment of U.S. military forces from Okinawa...

  12. Financial Planning and Management Practices of Electrical Contractors

    Directory of Open Access Journals (Sweden)

    Lucko Gunnar

    2016-12-01

    Full Text Available Contractors must carefully manage their cash outflows (e.g., for materials to enable their work and inflows (after the work to be profitable, particularly in an economy that is still recovering from the 2008-2012 recession that grew out of the mortgage crisis. Their importance for business success is undisputed, as bankruptcies due to insufficient cash flow underline. Therefore, this study investigated current business practices of electrical contracting companies of different sizes with respect to their financial planning and management. A detailed questionnaire was developed with best guidelines on survey studies and pilot testing. It was sent to members of the National Electrical Contractors Association. Respondent anonymity was ensured. The survey recorded demographics, business practices, operating conditions, and other important factors using 57 subquestions. Each section allowed feedback to clarify the numerical responses. Responses were well distributed across company sizes, so that the results are representative for the entire industry. The results indicated that contractors generally have a substantial amount of experience in financial decision making. Their approach is conservative and focuses on healthy growth. Yet, opportunities to fine-tune business practices are identified, e.g., immediate invoicing, considering discounts to accelerate payment receipts, attempting to negotiate and use favorable credit terms, reviewing payment performance, and performing frequent cash flow forecasts. Some of the differences in the responses can be attributed to different company sizes. To help especially smaller companies in planning their cash flow, a spreadsheet for implementation has been created.

  13. Accounting calculations problems with suppliers and contractors

    Directory of Open Access Journals (Sweden)

    Tikholaz I.A.

    2016-12-01

    Full Text Available in the article an order of accounting reflection of payments with suppliers and contractors are researched and ways of enhancement of accounting calculations process development with the purpose of management decisions optimization for their implementation are offered. Theoretical bases of intraeconomic control of settlings with suppliers and contractors are developed.

  14. National Radon Contractor Proficiency (RCP) Program. Proficiency report, June 1991

    International Nuclear Information System (INIS)

    1991-06-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in periodic RCP Proficiency Reports

  15. National Radon Contractor Proficiency (RCP) program. Proficiency report, September 1991

    International Nuclear Information System (INIS)

    1991-09-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving this objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide this information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under this voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  16. National Radon Contractor Proficiency (RCP) Program. Proficiency report, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  17. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising. ...

  18. 76 FR 48776 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-09

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor...

  19. Locational Factors and Foreign Market-entry Considerations for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    A.R Abdul_Aziz

    2012-11-01

    Full Text Available Past studies on contractor internationalisation adopt a unimodelapproach. Taking up the call of a few scholars, a study isconducted, this time by integrating several extant models of fi rminternationalisation. Malaysian international contractors are usedto test this approach. Due to space limitation, this paper is focusedonly on locational factors. It begins by justifying the inclusion oflocational factors in a multi-model approach. Then it posits thatlocational disadvantage is a more intellectually appealing conceptthan locational advantages. Empirically, it shows that the surveyedcontractors evaluate a wide range of factors before making thego/no go decision to enter foreign markets. It also shows thatpsychic distance was not their major concern. Finally, the locationaldisadvantages create a market space for international contractorswith the tenacity to overcome them, which the sampled populationpossessed.

  20. 42 CFR 405.874 - Appeals of CMS or a CMS contractor.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Appeals of CMS or a CMS contractor. 405.874 Section... Part B Program § 405.874 Appeals of CMS or a CMS contractor. A CMS contractor's (that is, a carrier... supplier enrollment application. If CMS or a CMS contractor denies a provider's or supplier's enrollment...

  1. 2011 Ground Testing Highlights Article

    Science.gov (United States)

    Ross, James C.; Buchholz, Steven J.

    2011-01-01

    Two tests supporting development of the launch abort system for the Orion MultiPurpose Crew Vehicle were run in the NASA Ames Unitary Plan wind tunnel last year. The first test used a fully metric model to examine the stability and controllability of the Launch Abort Vehicle during potential abort scenarios for Mach numbers ranging from 0.3 to 2.5. The aerodynamic effects of the Abort Motor and Attitude Control Motor plumes were simulated using high-pressure air flowing through independent paths. The aerodynamic effects of the proximity to the launch vehicle during the early moments of an abort were simulated with a remotely actuated Service Module that allowed the position relative to the Crew Module to be varied appropriately. The second test simulated the acoustic environment around the Launch Abort Vehicle caused by the plumes from the 400,000-pound thrust, solid-fueled Abort Motor. To obtain the proper acoustic characteristics of the hot rocket plumes for the flight vehicle, heated Helium was used. A custom Helium supply system was developed for the test consisting of 2 jumbo high-pressure Helium trailers, a twelve-tube accumulator, and a 13MW gas-fired heater borrowed from the Propulsion Simulation Laboratory at NASA Glenn Research Center. The test provided fluctuating surface pressure measurements at over 200 points on the vehicle surface that have now been used to define the ground-testing requirements for the Orion Launch Abort Vehicle.

  2. 48 CFR 2804.470 - Contractor Personnel Security Program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Personnel Security Program. 2804.470 Section 2804.470 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 2804.470 Contractor...

  3. 29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.

    Science.gov (United States)

    2010-07-01

    ... labor contractors' recruitment, contractual and general obligations. The Act imposes certain specific recruitment, contractual and general obligations on farm labor contractors and farm labor contractor employees... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractors' recruitment, contractual and...

  4. Anechoic Chamber test of the Electromagnetic Measurement System ground test unit

    Science.gov (United States)

    Stevenson, L. E.; Scott, L. D.; Oakes, E. T.

    1987-04-01

    The Electromagnetic Measurement System (EMMS) will acquire data on electromagnetic (EM) environments at key weapon locations on various aircraft certified for nuclear weapons. The high-frequency ground unit of the EMMS consists of an instrumented B61 bomb case that will measure (with current probes) the localized current density resulting from an applied EM field. For this portion of the EMMS, the first system test was performed in the Anechoic Chamber Facility at Sandia National Laboratories, Albuquerque, New Mexico. The EMMS pod was subjected to EM radiation at microwave frequencies of 1, 3, and 10 GHz. At each frequency, the EMMS pod was rotated at many positions relative to the microwave source so that the individual current probes were exposed to a direct line-of-sight illumination. The variations between the measured and calculated electric fields for the current probes with direct illumination by the EM source are within a few db. The results obtained from the anechoic test were better than expected and verify that the high frequency ground portion of the EMMS will accurately measure the EM environments for which it was designed.

  5. Selection and assessment of contractors; Auswahl und Beurteilung von Auftragnehmerfirmen

    Energy Technology Data Exchange (ETDEWEB)

    Lier, K.H. [ExxonMobil Production Deutschland GmbH, Hannover (Germany)

    2007-09-13

    Reliable and efficient contractors are important for the activities of ExxonMobil. Qualification of contractors is to ensure that contractors provide technical services in accordance with the specifications of ExxonMobil. Apart from the financial, oranisational and legal qualification this covers technical qualification, i.e. industrial safety, health protection and environmental protection, as well as technical efficiency and quality. The ultimate intention is to find out if contractors have the processes and systems at their disposal that are required for the services. The qualification process is described. (orig.)

  6. Effluent treatment options for nuclear thermal propulsion system ground tests

    International Nuclear Information System (INIS)

    Shipers, L.R.; Brockmann, J.E.

    1992-01-01

    A variety of approaches for handling effluent from nuclear thermal propulsion system ground tests in an environmentally acceptable manner are discussed. The functional requirements of effluent treatment are defined and concept options are presented within the framework of these requirements. System concepts differ primarily in the choice of fission-product retention and waste handling concepts. The concept options considered range from closed cycle (venting the exhaust to a closed volume or recirculating the hydrogen in a closed loop) to open cycle (real time processing and venting of the effluent). This paper reviews the strengths and weaknesses of different methods to handle effluent from nuclear thermal propulsion system ground tests

  7. Tank waste remediation system (TWRS) privatization contractor samples waste envelope D material 241-C-106

    Energy Technology Data Exchange (ETDEWEB)

    Esch, R.A.

    1997-04-14

    This report represents the Final Analytical Report on Tank Waste Remediation System (TWRS) Privatization Contractor Samples for Waste Envelope D. All work was conducted in accordance with ''Addendum 1 of the Letter of Instruction (LOI) for TWRS Privatization Contractor Samples Addressing Waste Envelope D Materials - Revision 0, Revision 1, and Revision 2.'' (Jones 1996, Wiemers 1996a, Wiemers 1996b) Tank 241-C-1 06 (C-106) was selected by TWRS Privatization for the Part 1A Envelope D high-level waste demonstration. Twenty bottles of Tank C-106 material were collected by Westinghouse Hanford Company using a grab sampling technique and transferred to the 325 building for processing by the Pacific Northwest National Laboratory (PNNL). At the 325 building, the contents of the twenty bottles were combined into a single Initial Composite Material. This composite was subsampled for the laboratory-scale screening test and characterization testing, and the remainder was transferred to the 324 building for bench-scale preparation of the Privatization Contractor samples.

  8. Information technology boosts contractor's economic success

    International Nuclear Information System (INIS)

    Penny, M.; Vasey, G.M.

    1995-01-01

    This article will discuss the advantages of Information Technology (IT) and how one drilling contractor, Global Marine, has applied this technology. The company has applied it in an efficient manner which has provided business benefits and cost reductions that have helped its operations be more successful. The following are the different aspects of information technology that led to the contractor's success: cost reduction measures; migration to a client/server IT infrastructure; IT business benefits; and keys to obtaining business benefits from IT

  9. Contractor Selection for Enhancing the Quality of University ...

    African Journals Online (AJOL)

    Contractor Selection for Enhancing the Quality of University Education in Nigeria using the Hamming Distance. DEA Omorogbe, SO Aibieyi. Abstract. The need for contractor selection in our university education system cannot be over emphasized. And applying scientific techniques for appropriateness and accuracy in the ...

  10. 48 CFR 36.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements...

  11. 48 CFR 49.405 - Completion by another contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Completion by another contractor. 49.405 Section 49.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... contractor. If the surety does not arrange for completion of the contract, the contracting officer normally...

  12. Fiscal Liability of State Contractors

    Directory of Open Access Journals (Sweden)

    Santiago Fajardo-Peña

    2017-06-01

    Full Text Available The State contract is one of the most important tools for public management. The formation, execution and liquidation of State contracts are also a potential cause of State patrimonial damages. Perhaps for this reason, many State contractors are prosecuted as if they were public spending managers. The question, however, is not as simple. The fiscal liability process has a qualified recipient: the fiscal manager. In this article, through a conceptual exposition and a case study, we identify the criterion for determining in which cases a State contractor acquires the function of controlling public funds and when he/she can be subjected to a fiscal liability.

  13. 77 FR 43078 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2012-07-23

    ...; Information Collection; Central Contractor Registration AGENCY: Department of Defense (DOD), General Services... requirement concerning the Central Contractor Registration database. Public comments are particularly invited... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  14. Ground vibration test results of a JetStar airplane using impulsive sine excitation

    Science.gov (United States)

    Kehoe, Michael W.; Voracek, David F.

    1989-01-01

    Structural excitation is important for both ground vibration and flight flutter testing. The structural responses caused by this excitation are analyzed to determine frequency, damping, and mode shape information. Many excitation waveforms have been used throughout the years. The use of impulsive sine (sin omega t)/omega t as an excitation waveform for ground vibration testing and the advantages of using this waveform for flight flutter testing are discussed. The ground vibration test results of a modified JetStar airplane using impulsive sine as an excitation waveform are compared with the test results of the same airplane using multiple-input random excitation. The results indicated that the structure was sufficiently excited using the impulsive sine waveform. Comparisons of input force spectrums, mode shape plots, and frequency and damping values for the two methods of excitation are presented.

  15. 78 FR 12316 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2013-02-22

    ...; Information Collection; Central Contractor Registration AGENCIES: Department of Defense (DOD), General... collection requirement concerning the Central Contractor Registration database. A notice was published in the... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  16. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  17. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  18. Optimal Contractor Selection in Construction Industry: The Fuzzy Way

    Science.gov (United States)

    Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.

    2018-02-01

    A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.

  19. Testing a ground-based canopy model using the wind river canopy crane

    Science.gov (United States)

    Robert Van Pelt; Malcolm P. North

    1999-01-01

    A ground-based canopy model that estimates the volume of occupied space in forest canopies was tested using the Wind River Canopy Crane. A total of 126 trees in a 0.25 ha area were measured from the ground and directly from a gondola suspended from the crane. The trees were located in a low elevation, old-growth forest in the southern Washington Cascades. The ground-...

  20. First year evaluation of EPA's radon contractor proficiency (RCP) program

    International Nuclear Information System (INIS)

    Salmon, G.L.

    1990-01-01

    This paper reports that the Environmental Protection Agency (EPA) has developed a voluntary program to evaluate radon reduction contractors and provide this information to the public, as part of activities mandated by the Indoor Radon Abatement Act (IRAA) of 1988. The Radon Contractor Proficiency Program consists of several elements that collectively help to ensure the proficiency of radon mitigators and give the public greater confidence in their capability. Contractors who participate in the program must pass a written examination, adhere to mitigation guidelines, keep records of work, meet continuing education requirements and pass a re-examination every two years. Upon meeting the program's requirements, mitigators are listed in EPA's National RCP Proficiency Report. The first Report released on May 15, 1990 listed 636 contractors. The second Report, to be release in August, will list 895 contractors, representing an increase of 40 per cent

  1. SOAC - State-of-the-Art Car Engineering Tests at Department of Transportation High Speed Ground Test Center : Volume 2. Performance Tests.

    Science.gov (United States)

    1975-01-01

    The six-volume report presents the technical methodology, data samples, and results of tests conducted on the SOAC on the Rail Transit Test Track at the High Speed Ground Test Center in Pueblo, Colorado during the period April to July 1973. The Test ...

  2. Operator and contractor benefit from incentive contracts

    International Nuclear Information System (INIS)

    Brandon, B.

    1991-01-01

    This book reports that with incentive contracts, drilling and service contractors assume greater responsibility for operations. That helps them to align their goals more closely with those of the operator. This achieves a more equitable division of the risks. Many operators and contractors believe this is a more appropriate approach to contracting drilling services. As they assume manageable responsibility, each party also has opportunities for greater reward. Innovations in cooperation can create a win-win situation. In a win-win contract all parties benefit from the new relationships between operator, contractor, and service company. The win-win situation can only be achieved by allowing the contracting parties to become much more closely involved in drilling operations. This is the primary motivation behind development of more productive contracting strategies

  3. Respiration testing for bioventing and biosparging remediation of petroleum contaminated soil and ground water

    International Nuclear Information System (INIS)

    Gray, A.L.; Brown, A.; Moore, B.J.; Payne, R.E.

    1996-01-01

    Respiration tests were performed to measure the effect of subsurface aeration on the biodegradation rates of petroleum hydrocarbon contamination in vadose zone soils (bioventing) and ground water (biosparging). The aerobic biodegradation of petroleum contamination is typically limited by the absence of oxygen in the soil and ground water. Therefore, the goal of these bioremediation technologies is to increase the oxygen concentration in the subsurface and thereby enhance the natural aerobic biodegradation of the organic contamination. One case study for biosparging bioremediation testing is presented. At this site atmospheric air was injected into the ground water to increase the dissolved oxygen concentration in the ground water surrounding a well, and to aerate the smear zone above the ground water table. Aeration flow rates of 3 to 8 cfm (0.09 to 0.23 m 3 /min) were sufficient to increase the dissolved oxygen concentration. Petroleum hydrocarbon biodegradation rates of 32 to 47 microg/l/hour were calculated based on measurements of dissolved oxygen concentration in ground water. The results of this test have demonstrated that biosparging enhances the biodegradation of petroleum hydrocarbons, but the results as they apply to remediation are not known. Two case studies for bioventing respiration testing are presented

  4. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    Science.gov (United States)

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2017-02-01

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.

  5. 77 FR 69715 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2012-11-20

    ... Contractor Registration AGENCY: Department of Defense (DoD), General Services Administration (GSA), and... changes the clauses requiring contractor registration in the Central Contractor Registration (CCR... unique identifier for contractors. It is used (1) to uniquely identify a contractor entity, and (2) to...

  6. Cryogenic actuator testing for the SAFARI ground calibration setup

    Science.gov (United States)

    de Jonge, C.; Eggens, M.; Nieuwenhuizen, A. C. T.; Detrain, A.; Smit, H.; Dieleman, P.

    2012-09-01

    For the on-ground calibration setup of the SAFARI instrument cryogenic mechanisms are being developed at SRON Netherlands Institute for Space Research, including a filter wheel, XYZ-scanner and a flipmirror mechanism. Due to the extremely low background radiation requirement of the SAFARI instrument, all of these mechanisms will have to perform their work at 4.5 Kelvin and low-dissipative cryogenic actuators are required to drive these mechanisms. In this paper, the performance of stepper motors, piezoelectric actuators and brushless DC-motors as cryogenic actuators are compared. We tested stepper motor mechanical performance and electrical dissipation at 4K. The actuator requirements, test setup and test results are presented. Furthermore, design considerations and early performance tests of the flipmirror mechanism are discussed. This flipmirror features a 102 x 72 mm aluminum mirror that can be rotated 45°. A Phytron stepper motor with reduction gearbox has been chosen to drive the flipmirror. Testing showed that this motor has a dissipation of 49mW at 4K with a torque of 60Nmm at 100rpm. Thermal modeling of the flipmirror mechanism predicts that with proper thermal strapping the peak temperature of the flipmirror after a single action will be within the background level requirements of the SAFARI instrument. Early tests confirm this result. For low-duty cycle operations commercial stepper motors appear suitable as actuators for test equipment in the SAFARI on ground calibration setup.

  7. Exposing government response action contractors to environmental tort liability

    International Nuclear Information System (INIS)

    Roy, M.J.

    1991-01-01

    Government contractors, particularly those involved with hazardous waste response action activities, are encountering increased risks for environmental tort liabilities. Contracts often include tasks and work assignments requiring the management of industrial, chemical, nuclear or mining wastes, spent fuels, munitions or other toxic substances. Contractors exposure to liability for damages results directly from the environmental laws and regulations pursuant to which the Government has contracted them to respond. Additionally, contractors may be exposed to common law liability under such dogmas as nuisance, trespass and strict liability in tort

  8. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor...

    Science.gov (United States)

    2010-10-29

    ...-AG52 Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor... that contractors providing essential contractor services, as determined by the requiring activity..., implementing the requirements of DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises...

  9. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Science.gov (United States)

    2010-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  10. Forced vibration tests of a model foundation on rock ground

    International Nuclear Information System (INIS)

    Kisaki, N.; Siota, M.; Yamada, M.; Ikeda, A.; Tsuchiya, H.; Kitazawa, K.; Kuwabara, Y.; Ogiwara, Y.

    1983-01-01

    The response of very stiff structures, such as nuclear reactor buildings, to earthquake ground motion is significantly affected by radiation damping due to the soil-structure interaction. The radiation damping can be computed by vibration admittance theory or dynamical ground compliance theory. In order to apply the values derived from these theories to the practical problems, comparative studies between theoretical results and experimental results concerning the soil-structure interaction, especially if the ground is rock, are urgently needed. However, experimental results for rock are less easily obtained than theoretical ones. The purpose of this paper is to describe the harmonic excitation tests of a model foundation on rock and to describe the results of comparative studies. (orig./HP)

  11. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Science.gov (United States)

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  12. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    Science.gov (United States)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  13. Project Finance Model for Small Contractors in USA

    Directory of Open Access Journals (Sweden)

    Jawahar Nesan

    2012-11-01

    Full Text Available Construction projects do not require a large capital outlay but a large working capital to start up the project. Unfortunately, for small contractors there are very limited options available from the banks or other lending institutions to cover this large working capital requirement in the absence of sufficient collateral. The “Project Finance” method presented in this paper is recommended as the most effective method for small contractors in the United States. The problems of small and start up contractors in funding their projects have been little addressed in the literature. The current financing practices were observed through both the literature review and interviews with contractors and bankers in the western Michigan area and subsequently a system has been proposed which could help a small start-up company seeking higher growth. The growth rates that can be achieved using the project finance system in contrast to the traditional “line of credit” arrangements as illustrated in this paper show that the project finance model is beneficial.

  14. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS Inc., Pittsburgh, PA (United States)

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  15. 76 FR 50714 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-16

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... August 9, 2011, regarding the proposed rule for Documenting Contractor Performance. DATES: The comment...

  16. Highlights of contractor initiatives in quality enhancement and productivity improvement

    Science.gov (United States)

    1986-01-01

    The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.

  17. Medicare Administrative Contractor Performance Evaluation

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) has compiled a summary of overall Medicare Administrative Contractor (MAC) performance information as measured...

  18. 48 CFR 852.236-72 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the....236-72 Performance of work by the contractor. As prescribed in 836.501, insert the following clause: Performance of Work by the Contractor (JUL 2002) The clause entitled “Performance of Work by the Contractor...

  19. Strategic management competencies in Scandinavian contractors

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2013-01-01

    Over the past ten years, a series of contractors operating in Denmark, Norway and Sweden have slowly but surely expanded their markets beyond their previous single-country base towards operating in Scandinavia as a whole, and beyond. This expansion has been accompanied by a restructuring of company...... management and HR concepts and approaches. Methodologically, a sample of the top level leaders of the hundred largest business units at some thirty Scandinavian contractors has been analysed. The focus is on the 400 top level managers in these organisations. On the basis of a desk study, an analysis of 124...

  20. Component design challenges for the ground-based SP-100 nuclear assembly test

    International Nuclear Information System (INIS)

    Markley, R.A.; Disney, R.K.; Brown, G.B.

    1989-01-01

    The SP-100 ground engineering system (GES) program involves a ground test of the nuclear subsystems to demonstrate their design. The GES nuclear assembly test (NAT) will be performed in a simulated space environment within a vessel maintained at ultrahigh vacuum. The NAT employs a radiation shielding system that is comprised of both prototypical and nonprototypical shield subsystems to attenuate the reactor radiation leakage and also nonprototypical heat transport subsystems to remove the heat generated by the reactor. The reactor is cooled by liquid lithium, which will operate at temperatures prototypical of the flight system. In designing the components for these systems, a number of design challenges were encountered in meeting the operational requirements of the simulated space environment (and where necessary, prototypical requirements) while also accommodating the restrictions of a ground-based test facility with its limited available space. This paper presents a discussion of the design challenges associated with the radiation shield subsystem components and key components of the heat transport systems

  1. Emerging Trends of the Owner-Contractor Relationship for Capital Facility Projects: From the Contractor Perspective

    National Research Council Canada - National Science Library

    Geertsema, Cameron

    2003-01-01

    .... Specifically, this document will focus on how the outcome of capital facility projects are affected by human resources practices, and the management principles and practices of the contractor-owner...

  2. 77 FR 51783 - Federal Acquisition Regulation; Information Collection; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2012-08-27

    ...; Information Collection; Contractors' Purchasing Systems Reviews AGENCY: Department of Defense (DOD), General... collection requirement concerning contractors' purchasing systems reviews. Public comments are particularly... Information Collection 9000- 0132, Contractors' Purchasing Systems Reviews, by any of the following methods...

  3. 76 FR 60837 - Federal Acquisition Regulation; Information Collection; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-09-30

    ...; Information Collection; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... concerning contractor business ethics compliance program and disclosure requirements. Public comments are... Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements, by any of...

  4. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  5. An SINS/GNSS Ground Vehicle Gravimetry Test Based on SGA-WZ02

    Directory of Open Access Journals (Sweden)

    Ruihang Yu

    2015-09-01

    Full Text Available In March 2015, a ground vehicle gravimetry test was implemented in eastern Changsha to assess the repeatability and accuracy of ground vehicle SINS/GNSS gravimeter—SGA-WZ02. The gravity system developed by NUDT consisted of a Strapdown Inertial Navigation System (SINS, a Global Navigation Satellite System (GNSS remote station on test vehicle, a GNSS static master station on the ground, and a data logging subsystem. A south-north profile of 35 km along the highway in eastern Changsha was chosen and four repeated available measure lines were obtained. The average speed of a vehicle is 40 km/h. To assess the external ground gravity disturbances, precise ground gravity data was built by CG-5 precise gravimeter as the reference. Under relative smooth conditions, internal accuracy among repeated lines shows an average agreement at the level of 1.86 mGal for half wavelengths about 1.1 km, and 1.22 mGal for 1.7 km. The root-mean-square (RMS of difference between calculated gravity data and reference data is about 2.27 mGal/1.1 km, and 1.74 mGal/1.7 km. Not all of the noises caused by vehicle itself and experiments environments were eliminated in the primary results. By means of selecting reasonable filters and improving the GNSS observation conditions, further developments in ground vehicle gravimetry are promising.

  6. Bridge Testing With Ground-Based Interferometric Radar: Experimental Results

    International Nuclear Information System (INIS)

    Chiara, P.; Morelli, A.

    2010-01-01

    The research of innovative non-contact techniques aimed at the vibration measurement of civil engineering structures (also for damage detection and structural health monitoring) is continuously directed to the optimization of measures and methods. Ground-Based Radar Interferometry (GBRI) represents the more recent technique available for static and dynamic control of structures and ground movements.Dynamic testing of bridges and buildings in operational conditions are currently performed: (a) to assess the conformity of the structure to the project design at the end of construction; (b) to identify the modal parameters (i.e. natural frequencies, mode shapes and damping ratios) and to check the variation of any modal parameters over the years; (c) to evaluate the amplitude of the structural response to special load conditions (i.e. strong winds, earthquakes, heavy railway or roadway loads). If such tests are carried out by using a non-contact technique (like GBRI), the classical issues of contact sensors (like accelerometers) are easily overtaken.This paper presents and discusses the results of various tests carried out on full-scale bridges by using a Stepped Frequency-Continuous Wave radar system.

  7. Bridge Testing With Ground-Based Interferometric Radar: Experimental Results

    Science.gov (United States)

    Chiara, P.; Morelli, A.

    2010-05-01

    The research of innovative non-contact techniques aimed at the vibration measurement of civil engineering structures (also for damage detection and structural health monitoring) is continuously directed to the optimization of measures and methods. Ground-Based Radar Interferometry (GBRI) represents the more recent technique available for static and dynamic control of structures and ground movements. Dynamic testing of bridges and buildings in operational conditions are currently performed: (a) to assess the conformity of the structure to the project design at the end of construction; (b) to identify the modal parameters (i.e. natural frequencies, mode shapes and damping ratios) and to check the variation of any modal parameters over the years; (c) to evaluate the amplitude of the structural response to special load conditions (i.e. strong winds, earthquakes, heavy railway or roadway loads). If such tests are carried out by using a non-contact technique (like GBRI), the classical issues of contact sensors (like accelerometers) are easily overtaken. This paper presents and discusses the results of various tests carried out on full-scale bridges by using a Stepped Frequency-Continuous Wave radar system.

  8. 78 FR 59851 - Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ...-AH97 Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee... contractor and subcontractor employees. DATES: Effective date: September 30, 2013. In accordance with FAR 1... Whistleblower Protections for Contractor Employees) made extensive changes to 10 U.S.C. 2409, entitled...

  9. Ground test program for a full-size solar dynamic heat receiver

    Science.gov (United States)

    Sedgwick, L. M.; Kaufmann, K. J.; Mclallin, K. L.; Kerslake, T. W.

    1991-01-01

    Test hardware, facilities, and procedures were developed to conduct ground testing of a full-size, solar dynamic heat receiver in a partially simulated, low earth orbit environment. The heat receiver was designed to supply 102 kW of thermal energy to a helium and xenon gas mixture continuously over a 94 minute orbit, including up to 36 minutes of eclipse. The purpose of the test program was to quantify the receiver thermodynamic performance, its operating temperatures, and thermal response to changes in environmental and power module interface boundary conditions. The heat receiver was tested in a vacuum chamber using liquid nitrogen cold shrouds and an aperture cold plate. Special test equipment was designed to provide the required ranges in interface boundary conditions that typify those expected or required for operation as part of the solar dynamic power module on the Space Station Freedom. The support hardware includes an infrared quartz lamp heater with 30 independently controllable zones and a closed-Brayton cycle engine simulator to circulate and condition the helium-xenon gas mixture. The test article, test support hardware, facilities, and instrumentation developed to conduct the ground test program are all described.

  10. Contractors on the Battlefield: What Have We Signed Up For?

    National Research Council Canada - National Science Library

    Zamparelli, Steven

    1999-01-01

    The role of contractors in warfare has changed dramatically. As the Services have drawn down, more and more of the duties formerly accomplished by military members are being performed by contractors...

  11. Variations in radon-222 in soil and ground water at the Nevada Test Site

    International Nuclear Information System (INIS)

    Wollenberg, H.; Straume, T.; Smith, A.; King, C.Y.

    1977-01-01

    To help evaluate the applicability of variations of radon-222 in ground water and soil gas as a possible earthquake predictor, measurements were conducted in conjunction with underground explosions at the Nevada Test Site (NTS). Radon fluctuations in ground water have been observed during a sequence of aftershocks following the Oroville, California earthquake of 1 August 1975. The NTS measurements were designed to show if these fluctuations were in response to ground shaking; if not, they could be attributed to changes in earth strain prior to the aftershocks. Well waters were periodically sampled and soil-gas 222 Rn monitored prior to and following seven underground explosions of varying strength and distance from sampling and detector locations. Soil-gas 222 Rn contents were measured by the alpha-track method; well water 222 Rn by gamma-ray spectrometry. There was no clearly identifiable correlation between well-water radon fluctuations and individual underground tests. One prominent variation in soil-gas radon corresponded to ground shaking from a pair of underground tests in alluvium; otherwise, there was no apparent correlation between radon emanation and other explosions. Markedly lower soil-gas radon contents following the tests were probably caused by consolidation of alluvium in response to ground shaking

  12. 75 FR 55577 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-13

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9200-8] Clean Water Act; Contractor Access to Confidential... Recovery Act (RCRA). Transfer of the information will allow the contractor and subcontractors to access... contractors and subcontractors over the history of the effluent guidelines program. EPA determined that this...

  13. 75 FR 82575 - Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel

    Science.gov (United States)

    2010-12-30

    ... 9000-AL60 Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel AGENCY... requirement of collecting from contractors all forms of Government-provided identification once they are no...D Inspector General Audit Report No. D-2009-005, entitled ``Controls Over the Contractor Common...

  14. 77 FR 60962 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2012-10-05

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 2 [FRL-9733-8] Clean Water Act; Contractor Access to... transfer of confidential business information to contractor, subcontractors, and consultants. SUMMARY: The... certain industries. We have determined that the contractors listed below require access [[Page 60963

  15. 77 FR 51496 - Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems

    Science.gov (United States)

    2012-08-24

    ... Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems AGENCY: Department of... Acquisition Regulation (FAR) to add a new subpart and contract clause for the basic safeguarding of contractor... information) that will be resident on or transiting through contractor information systems. DATES: Interested...

  16. 75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...

  17. 76 FR 4343 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-01-25

    ...; Contractor Conflicts of Interest AGENCY: Environmental Protection Agency. ACTION: Notice. SUMMARY: In... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors... cleanup and enforcement and because its contractors are often involved in both activities, it is...

  18. 76 FR 81490 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-12-28

    ... Activities; Proposed Collection; Comment Request; Contractor Cumulative Claim and Reconciliation (Renewal... identify the Docket ID Number EPA-HQ-OARM-2011-0997, Contractor Cumulative Claim and Reconciliation. Hand... information collection activity or ICR does this apply to? Affected entities: All contractors who have...

  19. The main factor affecting the competitiveness of Contractor Company

    Science.gov (United States)

    Nurisra; Malahayati, Nurul; Mahmuddin

    2018-05-01

    Contractor companies must have the competitive advantage to compete in maintaining the survival of the company. Problems arise because quite a lot of advantages can be used and these advantages must be used appropriately to produce competitiveness for the company to continue to compete and to win the competition. This study aims to determine the main factors affecting the competitiveness of medium-class contractors in Banda Aceh. Data collection was obtained through questionnaires distributed to 31 middle-class contractors in Banda Aceh. Data processing and analysis is done by using descriptive analysis. Based on the result of descriptive analysis, it can be concluded that the most important competitiveness factor with a mean score value 4.52 is the relationship, and the factor that has the highest mean score value is the relationship with the government of 4.97, while the result of the ranking analysis is obtained 25 factor that is critical to the competitiveness of medium-class contractors in Banda Aceh.

  20. ACED Federal Grant Contractor Tracking

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Dataset includes grant, project, and contractor awarded which are tracked for ensuring Davis-Bacon Act compliance where applicable. The 1931 Davis-Bacon Act...

  1. Construction Manager or General Contractor?

    Science.gov (United States)

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  2. 76 FR 20661 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-04-13

    ... Activities; Proposed Collection; Comment Request; Contractor Conflicts of Interest AGENCY: Environmental....regulations.gov . Title: Contractor Conflicts of Interest. ICR numbers: EPA ICR No. 1550.09, OMB Control No... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors...

  3. 78 FR 79692 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2013-12-31

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9904-94-OW] Clean Water Act; Contractor Access to... Transfer of Confidential Business Information to Contractor, Subcontractors, and Consultants. SUMMARY: The... contractors listed below require access to CBI submitted to EPA under Section 308 of the Clean Water Act (CWA...

  4. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  5. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  6. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Science.gov (United States)

    2012-03-05

    ..., [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract The NASA Contractor Financial Management... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 12-019] Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION...

  7. An Empirical Assessment of Defense Contractor Risk 1976-1984.

    Science.gov (United States)

    1986-06-01

    X - 7 a 2 n2m E X -) i=l m m Also under the assumptions of the CAPM , the relationship between an individual security’s expected rate of return and...Line 10𔃾 Thus, the CAPM , framed within certain simplifying assumptions , implies a linear relationship between return on investment in a company’s stock...Model ( CAPM ) is tested with regard to the same three sample groups of contractors. The third method is mean-variance analysis of both total and

  8. 48 CFR 307.108-70 - Telecommuting of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Telecommuting of... Telecommuting of contractor employees. (a) SOWs/PWSs shall permit offerors or contractors to specify their own... telecommuting) for any part of an SOW/PWS, after determining that the work or any portion thereof must be...

  9. 23 CFR 635.110 - Licensing and qualification of contractors.

    Science.gov (United States)

    2010-04-01

    ... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... competition, to prevent submission of a bid by, or to prohibit the consideration of a bid submitted by, any...) No contractor shall be required by law, regulation, or practice to obtain a license before submission...

  10. GES [Ground Engineering System] test site preparation

    International Nuclear Information System (INIS)

    Cox, C.M.; Mahaffey, M.K.; Miller, W.C.; Schade, A.R.; Toyoda, K.G.

    1987-10-01

    Activities are under way at Hanford to convert the 309 containment building and its associated service wing to a nuclear test facility for the Ground Engineering System (GES) test. Conceptual design is about 80% complete, encompassing facility modifications, a secondary heat transport system, a large vacuum system, a test article cell and handing system, control and data handling systems, and safety andl auxiliary systems. The design makes extensive use of existing equipment to minimize technical risk and cost. Refurbishment of this equipment is 25% complete. Cleanout of some 1000 m 3 of equipment from the earlier reactor test in the facility is 85% complete. An Environmental Assessment was prepared and revised to incorporate Department of Energy (DOE) comments. It is now in the DOE approval chain, where a Finding of No Significant Impact is expected. During the next year, definite design will be well advanced, long-lead procurements will be initiated, construction planning will be completed, an operator training plan will be prepared, and the site (preliminary) safety analysis report will be drafted

  11. An equivalent ground thermal test method for single-phase fluid loop space radiator

    Directory of Open Access Journals (Sweden)

    Xianwen Ning

    2015-02-01

    Full Text Available Thermal vacuum test is widely used for the ground validation of spacecraft thermal control system. However, the conduction and convection can be simulated in normal ground pressure environment completely. By the employment of pumped fluid loops’ thermal control technology on spacecraft, conduction and convection become the main heat transfer behavior between radiator and inside cabin. As long as the heat transfer behavior between radiator and outer space can be equivalently simulated in normal pressure, the thermal vacuum test can be substituted by the normal ground pressure thermal test. In this paper, an equivalent normal pressure thermal test method for the spacecraft single-phase fluid loop radiator is proposed. The heat radiation between radiator and outer space has been equivalently simulated by combination of a group of refrigerators and thermal electrical cooler (TEC array. By adjusting the heat rejection of each device, the relationship between heat flux and surface temperature of the radiator can be maintained. To verify this method, a validating system has been built up and the experiments have been carried out. The results indicate that the proposed equivalent ground thermal test method can simulate the heat rejection performance of radiator correctly and the temperature error between in-orbit theory value and experiment result of the radiator is less than 0.5 °C, except for the equipment startup period. This provides a potential method for the thermal test of space systems especially for extra-large spacecraft which employs single-phase fluid loop radiator as thermal control approach.

  12. Cross-national research on contractor evaluation procedures in public works procurement

    Science.gov (United States)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  13. Ground-based self-gravity tests for LISA Pathfinder and LISA

    International Nuclear Information System (INIS)

    Trenkel, C; Warren, C; Wealthy, D

    2009-01-01

    Gravitational coupling between the free-falling test masses and the surrounding spacecraft is one of the dominant noise sources for both LISA Pathfinder and LISA. At present, there are no plans to verify any of the self-gravity requirements by test, on the ground. Here, we explore the possibilities of conducting such tests, using a customised torsion balance. We discuss the main sources of systematic and statistical uncertainty present in such a set-up. Our preliminary assessment indicates that the sensitivity is sufficient to carry out meaningful self-gravity tests.

  14. Launch and Landing Effects Ground Operations (LLEGO) Model

    Science.gov (United States)

    2008-01-01

    LLEGO is a model for understanding recurring launch and landing operations costs at Kennedy Space Center for human space flight. Launch and landing operations are often referred to as ground processing, or ground operations. Currently, this function is specific to the ground operations for the Space Shuttle Space Transportation System within the Space Shuttle Program. The Constellation system to follow the Space Shuttle consists of the crewed Orion spacecraft atop an Ares I launch vehicle and the uncrewed Ares V cargo launch vehicle. The Constellation flight and ground systems build upon many elements of the existing Shuttle flight and ground hardware, as well as upon existing organizations and processes. In turn, the LLEGO model builds upon past ground operations research, modeling, data, and experience in estimating for future programs. Rather than to simply provide estimates, the LLEGO model s main purpose is to improve expenses by relating complex relationships among functions (ground operations contractor, subcontractors, civil service technical, center management, operations, etc.) to tangible drivers. Drivers include flight system complexity and reliability, as well as operations and supply chain management processes and technology. Together these factors define the operability and potential improvements for any future system, from the most direct to the least direct expenses.

  15. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  16. Selection of disposal contractor by multi criteria decision making methods

    Directory of Open Access Journals (Sweden)

    Cenker Korkmazer

    2016-08-01

    Full Text Available Hazardous waste is substance that threaten people and environment in case of improper storage, disposal and transport due to its concentration, physical and chemical properties. Companies producing hazardous waste as a result of several activities mostly do not have any own disposal facilities. In addition, they do not pay attention enough to determine the right contractor as a disposal facility. On the other hand, there are various qualitative and quantitative criteria affecting the selection of the contractor and conflicting with each other. The aim of the performed study is to assist one of these companies producing hazardous waste in the selection of the best contractor that eliminates hazardous waste economic and harmless way. In the study, contractor weights in percentage is calculated by using Analytic Network Process (ANP as one of the multi-criteria decision making (MCDM methods and widely used in the literature which considers both qualitative and quantitative criteria. In the next step, by the help of the mathematical model, contractors that will be given which type of hazardous waste are identified. This integrated approach can be used as a guide for similar firms.

  17. Innovation Strategy in Slovak Forest Contractor Firms—A SWOT Analysis

    Directory of Open Access Journals (Sweden)

    Martina Štěrbová

    2016-05-01

    Full Text Available The aim of the study is to determine the innovation strategy of contractor firms in the Slovak forestry service sector in the area of further innovation activities development. The strategy identification was based on the analysis of the strengths, weaknesses, opportunities and threats in this sector. The results indicate that weaknesses of contractor firms exceed their strengths and, considering the degree and importance of their impact, opportunities exceed identified threats. Based on these findings revealing the relations in the area of innovation activities of forestry service contractors, the “Strategy of Partnership” was suggested as the most suitable type of strategy. It can be concluded that such a form of grouping cooperation brings many benefits to contractors in the form of information availability, guidance, training, and management of conflicts, risks and uncertainty, which are associated with the innovation process.

  18. 77 FR 17098 - Proposed Extension of Existing Information Collection; Independent Contractor Registration and...

    Science.gov (United States)

    2012-03-23

    ... Information Collection; Independent Contractor Registration and Identification AGENCY: Mine Safety and Health...-00040, Independent Contractor Register. OMB last approved this information collection request (ICR) on...); or 202-693-9441 (facsimile). SUPPLEMENTARY INFORMATION: I. Background Independent contractors...

  19. Representation a Framwork for Contractors Selection Via of Health, Safety and Environment

    Directory of Open Access Journals (Sweden)

    Shahram Mahmoudi

    2016-12-01

    Full Text Available Introduction: Quality and efficiency of health, safety, and environment (HSE management systems play a vital role in achieving their goals. Considering outputs and objective achievement make continuous improvement of services and products, internal and external customer satisfaction, adopting a systematic way for performing various tasks, system performance and analysis very important. The present study was conducted to construct a proper framework for assessing MAPNA group contractors in terms of their health, safety, and environment performance.  . Method: In the first step of the study, all documents and literature associated with performance assessment were reviewed. In the second step, using a focus group approach, a basic model for assessing HSE management system was designed. Lastly, the framework was tested and credited on three major contractors of MAPNA group. Results: The proposed framework was composed of five criteria. The main criteria was the pattern of HSE process implementation which had seven sub-criteria and 120 guiding hints. Moreover, the five criteria were able to assess the organizational capabilities in terms of health, safety, and environment management.. Conclusion: The proposed framework make contractors able to promote their HSE performances by identifying organizational strong and weak points, prioritizing improvement projects, and also monitoring the pace of improvement in achieving organizational excellence..

  20. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Science.gov (United States)

    2010-07-23

    ...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...

  1. Radiation exposures for DOE and DOE contractor employees, 1989

    International Nuclear Information System (INIS)

    Smith, M.H.; Eschbach, P.A.; Harty, R.; Millet, W.H.; Scholes, V.A.

    1992-12-01

    All US Department of Energy (DOE) and DOE contractors, are required to submit occupational radiation exposure records to a central depository. In 1989, data were required to be submitted for all employees who were required to be monitored in accordance with DOE Order 5480.11 and for all visitors who had a positive exposure. The data required included the external penetrating whole-body dose equivalent, the shallow dose equivalent, and a summary of internal depositions of radioactive material above specified limits. Data regarding the exposed individuals included the individual's age, sex, and occupational category. This report is a summary of the external penetrating whole-body dose equivalents and shallow dose equivalents reported by DOE and DOE contractors for the calendar year 1989. A total of 90,882 DOE and DOE contractor employees were reported to have been monitored for whole-body ionizing radiation exposure during 1989. This represents 53.6% of all DOE and DOE contractor employees and is an increase (4.3 %) from the number of monitored employees for 1988. In addition to the employees, 12,643 visitors were monitored

  2. EDRP public local inquiry, UKAEA/BNFL precognition on: Contractor accommodation

    International Nuclear Information System (INIS)

    Scott, W.

    1986-01-01

    The availability of accommodation for contractors working on the proposed EDRP at Dounreay is discussed. It is predicted that the contractors could be accommodated without the need for special arrangement and with no adverse effect on the tourist industry. (U.K.)

  3. Effluent Containment System for space thermal nuclear propulsion ground test facilities

    International Nuclear Information System (INIS)

    1995-08-01

    This report presents the research and development study work performed for the Space Reactor Power System Division of the U.S. Department of Energy on an innovative ECS that would be used during ground testing of a space nuclear thermal rocket engine. A significant portion of the ground test facilities for a space nuclear thermal propulsion engine are the effluent treatment and containment systems. The proposed ECS configuration developed recycles all engine coolant media and does not impact the environment by venting radioactive material. All coolant media, hydrogen and water, are collected, treated for removal of radioactive particulates, and recycled for use in subsequent tests until the end of the facility life. Radioactive materials removed by the treatment systems are recovered, stored for decay of short-lived isotopes, or packaged for disposal as waste. At the end of the useful life, the facility will be decontaminated and dismantled for disposal

  4. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  5. Integrating Contractors into the Logistics Force

    National Research Council Canada - National Science Library

    Terrell, Ronald G

    2006-01-01

    ... a panacea. For a combatant commander to effectively integrate them with his military force requires an understanding of the operational environment, contractor capabilities, acceptable levels of risk...

  6. Private Military and Security Contractors

    DEFF Research Database (Denmark)

    In Private Military and Security Contractors: Controlling the Corporate Warrior a multinational team of 16 scholars and a practitioner from political science, sociology, and law address a developing phenomenon: controlling the use of privatized force by states in international politics. Robust...

  7. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-04-23

    ...; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department of... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of the...

  8. Legal distinction between employee and independent contractor as applied to collective bargaining activities in timber harvesting

    Science.gov (United States)

    James E. Granskog; William C. Siegal

    1977-01-01

    Collective bargaining attempts by timber harvesting labor groups is often complicated by lack of a clear legal distinction between "employees" and "independent contractors." the primary criterion to make the distinction - the "right-to-control" test of common law - has now been amplified by a number of secondary tests, including: 1) the...

  9. 48 CFR 252.237-7023 - Continuation of Essential Contractor Services.

    Science.gov (United States)

    2010-10-01

    ... provide a written plan for continuing the performance of essential contractor services identified in...; and (v) The approach for communicating expectations to contractor employees regarding their roles and... or other designated representative as expeditiously as possible and use its best efforts to cooperate...

  10. 78 FR 29247 - Contractor Legal Management Requirements; Acquisition Regulations; Correction

    Science.gov (United States)

    2013-05-20

    ... DEPARTMENT OF ENERGY 48 CFR Part 952 RIN 1990-AA37 Contractor Legal Management Requirements; Acquisition Regulations; Correction AGENCY: Department of Energy. ACTION: Final rule; correction. SUMMARY: The... (78 FR 25795). In this document, DOE revised existing regulations covering contractor legal management...

  11. Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

    Science.gov (United States)

    Lemke, Paul R.; Tuma, Margaret L.; Askins, Bruce R.

    2008-01-01

    For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

  12. The Inadequacy of Existing Far Provisions to Ensure Contractor Environmental Compliance

    National Research Council Canada - National Science Library

    MacDonald, Edward

    1997-01-01

    This thesis focuses on situations where the obligation is on the contractor, and examines the existing FAR provisions and clauses to explore whether they are adequate to ensure government contractor...

  13. 75 FR 71564 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-11-24

    ... Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025... conducting a Contractor Insurance/Pension Review from Procedures, Guidance, and Information (PGI) to the... This final rule relocates requirements for Contractor Insurance/ Pension Review to DFARS 242.7302 from...

  14. 78 FR 60169 - Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ... 9000-AM56 Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee... program enhancing whistleblower protections for contractor employees. DATES: Effective: September 30, 2013... contractor employees at FAR subpart 3.9. The pilot program is mandated by section 828, entitled ``Pilot...

  15. Site contractor participation in the DOE SWEIS process at Los Alamos, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Pendergrass, A.; Garvey, D.

    1997-12-01

    The U.S. Department of Energy (DOE) prepares site-wide environmental impact statements (SWEIS) on sites that are to remain in operation in order to provide an estimate of the cumulative environmental impacts from projected future operations at the site. DOE has relied on outside contractors rather than the site management and operating (M&O) contractors to prepare EISs, in order to preclude the potential for conflict of interest. The site M&O contractors, who know the potential for conflict of interest. The site M&O contractors, who know the site best and are most familiar with existing information, are critical support for the contractor. The University of California (UC) is the site M&O contractor for Los Alamos National Laboratory (LANL) in Los Alamos, NM. The role of LANL (UC) personnel in DOE`s preparation process for the LANL SWEIS is described. 3 refs.

  16. Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

    Science.gov (United States)

    Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.

    2013-01-01

    The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.

  17. Beyond the design fix - New industrialisation in contractor's supplier relationships

    DEFF Research Database (Denmark)

    Koch, Christian; Frödell, M.; Josephson, P.E.

    2010-01-01

    by the Erabuild program, this paper presents 3 cases of long term transformation of contractor- supplier relations as general contractors outsource and commence professionalising purchasing moving it from project purchasing into strategic purchasing. It is suggested that “new industrialisation” is a long term...

  18. Orion Ground Test Article Water Impact Tests: Photogrammetric Evaluation of Impact Conditions

    Science.gov (United States)

    Vassilakos, Gregory J.; Mark, Stephen D.

    2018-01-01

    The Ground Test Article (GTA) is an early production version of the Orion Crew Module (CM). The structural design of the Orion CM is being developed based on LS-DYNA water landing simulations. As part of the process of confirming the accuracy of LS-DYNA water landing simulations, the GTA water impact test series was conducted at NASA Langley Research Center (LaRC) to gather data for comparison with simulations. The simulation of the GTA water impact tests requires the accurate determination of the impact conditions. To accomplish this, the GTA was outfitted with an array of photogrammetry targets. The photogrammetry system utilizes images from two cameras with a specialized tracking software to determine time histories for the 3-D coordinates of each target. The impact conditions can then be determined from the target location data.

  19. Standard Test Methods for Insulation Integrity and Ground Path Continuity of Photovoltaic Modules

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2000-01-01

    1.1 These test methods cover procedures for (1) testing for current leakage between the electrical circuit of a photovoltaic module and its external components while a user-specified voltage is applied and (2) for testing for possible module insulation breakdown (dielectric voltage withstand test). 1.2 A procedure is described for measuring the insulation resistance between the electrical circuit of a photovoltaic module and its external components (insulation resistance test). 1.3 A procedure is provided for verifying that electrical continuity exists between the exposed external conductive surfaces of the module, such as the frame, structural members, or edge closures, and its grounding point (ground path continuity test). 1.4 This test method does not establish pass or fail levels. The determination of acceptable or unacceptable results is beyond the scope of this test method. 1.5 There is no similar or equivalent ISO standard. This standard does not purport to address all of the safety concerns, if a...

  20. 78 FR 4425 - Notice of Proposed Information Collection: Comment Request; Multifamily Contractor's Mortgagor's...

    Science.gov (United States)

    2013-01-22

    ... Information Collection: Comment Request; Multifamily Contractor's Mortgagor's Cost Breakdowns and... comments on the subject proposal. Contractors use the form HUD-2328 to establish a schedule of values of construction items on which the monthly advances or mortgage proceeds are based. Contractors use the form HUD...

  1. 76 FR 68017 - Federal Acquisition Regulation; Preventing Personal Conflicts of Interest for Contractor...

    Science.gov (United States)

    2011-11-02

    ... Contractor Employees Performing Acquisition Functions AGENCIES: Department of Defense (DoD), General Services... personal conflicts of interest by employees of Government contractors as required by statute. DATES... clause for future orders. In the event that a contractor refuses to accept such a modification, the...

  2. 75 FR 55671 - Financial Assistance Use of Universal Identifier and Central Contractor Registration

    Science.gov (United States)

    2010-09-14

    ... of Universal Identifier and Central Contractor Registration AGENCY: Office of Federal Financial...) numbers and maintain current registrations in the Central Contractor Registration (CCR) database. An... CONTRACTOR REGISTRATION Sec. Subpart A--General 25.100 Purposes of this part. 25.105 Types of awards to which...

  3. Contractors In The Theater: Implications For Joint Operational Planning And Execution

    National Research Council Canada - National Science Library

    Binder, Jeanne

    2003-01-01

    The use of contractors in the theater of operations is nothing new. However downsizing efforts and outsourcing as well as the increasing complexity of military equipment has increased military reliance on contractors...

  4. Contractor Development Models for Promoting Sustainable Building – a case for developing management capabilities of contractors

    CSIR Research Space (South Africa)

    Dlungwana, Wilkin S

    2004-11-01

    Full Text Available Construction industry and indeed all small and medium-sized contractors play a significant socio-economic role in the developing countries. This paper highlights the importance of promoting sustainable building through the implementation...

  5. 48 CFR 2052.209-72 - Contractor organizational conflicts of interest.

    Science.gov (United States)

    2010-10-01

    ... conflicts of interest. 2052.209-72 Section 2052.209-72 Federal Acquisition Regulations System NUCLEAR... Clauses 2052.209-72 Contractor organizational conflicts of interest. As prescribed at 2009.570-5(a) and..., contracts, and simplified acquisitions of the types described; 2009.570-4(b): Contractor Organizational...

  6. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Science.gov (United States)

    2010-10-01

    ... the Contractor's negligence, indemnification shall be at a rate not to exceed sixty cents per pound per article. (ii) Negligent damage. When loss or damage is caused by the negligence of the Contractor...

  7. Military Contractors - Too Much Dependence

    Science.gov (United States)

    2008-03-19

    promotes integrity, physical strength, health, unity, cooperation and teamwork. It combats stereotyping and sexual harassment. It fosters in its...weeklyreport108-000001337290&type= toc &num=115&; accessed 15 Jan 2008. 20 U.S. Department of the Army, Contractors on the Battlefield, Field Manual 3

  8. Proceedings of the fuels technology contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  9. Critical Electronic Data Loss Perceptions of United States Military Contractors

    Science.gov (United States)

    Singletary, Tod J.

    2017-01-01

    The United States Military has become increasingly dependent upon technology to meet its mission objectives with a consequence being greater dependence on civilian defense contractors to provide specialized services in support of high-tech mission requirements. Modern military defense contractors have also become dependent upon reliable and secure…

  10. Appeals - Redetermination by a Medicare Contractor

    Data.gov (United States)

    U.S. Department of Health & Human Services — A redetermination is an examination of a claim by the fiscal intermediary (FI), carrier, or Medicare Administrative Contractor (MAC) personnel who are different from...

  11. Human Resources Staffing Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BOSLEY, J.W.

    2000-01-01

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  12. THE EVALUATION OF THE IMPLEMENTATION OF CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS PROGRAM ON TURNAROUND PROJECT (TA AT PT. PUPUK SRIWIDJAJA (PUSRI PALEMBANG

    Directory of Open Access Journals (Sweden)

    Muhammad Arif

    2016-03-01

    Full Text Available Background :Turnaround is one of the done by contractor in which if it is not managed well, it could cause work accident. The purpose of this study was to evaluate the implementation of contractor safety management system (CSMS program on turnaround project at PT. Pupuk Sriwidjaja Palembang. Method : This study was a qualitative study. The information was obtained from deep interview, observation and the study of document. The data was analyzed by using content analysis. The validity of the instruments was tested through triangulation of sources, method and data Result : The program implementation Contractor Safety Management System (CSMS on a turnaround project is already well underway only on projects in addition to departments turnaround K3 & LH less involved in the risk assessment stage, pre-qualification and selection of contractors. Conclusion : The implementation of the program Contractor Safety Management System (CSMS on a turnaround project at PT. Pupuk Sriwidjaja Palembang are in accordance with the Code of Labor Management Health, Safety and Environmental Protection Contractor BPMIGAS. It is advisable to PT. Pupuk Sriwidjaja Palembang in order to improve communication between departments procure goods and services with K3 and LH-related departments work tendered as the risk assessment stage, pre-qualification and selection on work tendered. Need sanctions against contractors who do not regularly report performance data K3.

  13. Application of integrated fuzzy VIKOR & AHP methodology to contractor ranking

    Directory of Open Access Journals (Sweden)

    Mohamad Rahim Ramezaniyan

    2012-08-01

    Full Text Available Contractor selection is a critical activity, which plays an important role in the overall success of any construction project. The implementation of fuzzy multiple criteria decision attribute (MCDA in selecting contractors has the advantage of rendering subjective and implicit decision making more objective and transparent. An additional merit of fuzzy MCDA is the ability to accommodate quantitative and qualitative information. In this paper, an integrated VIKOR–AHP methodology is proposed to make a selection among the alternative contractors in one of Iranian construction industry projects. In the proposed methodology, the weights of the selection criteria are determined by fuzzy pairwise comparison matrices of AHP.

  14. 48 CFR 836.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. The contracting officer shall insert the clause at 852.236-72, Performance of work by the contractor, in solicitations and contracts for construction that contain the FAR...

  15. 76 FR 37353 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-06-27

    ...; Submission for OMB Review; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... contractor business ethics compliance program and disclosure requirements. Public comments are particularly... Information Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements...

  16. Joint ACE ground penetrating radar antenna test facility at the Technical University of Denmark

    DEFF Research Database (Denmark)

    Lenler-Eriksen, Hans-Rudolph; Meincke, Peter; Sarri, A.

    2005-01-01

    A ground penetrating radar (GPR) antenna test facility, established within the ACE network at the Technical University of Denmark (DTU), is described. Examples of results from the facility obtained from measurements of eight different GPR antennas are presented.......A ground penetrating radar (GPR) antenna test facility, established within the ACE network at the Technical University of Denmark (DTU), is described. Examples of results from the facility obtained from measurements of eight different GPR antennas are presented....

  17. 48 CFR 36.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. (a) To assure adequate interest in and supervision of all work involved... contracting officer shall insert the clause at 52.236-1, Performance of Work by the Contractor, in...

  18. Flow Quality Analysis of Shape Morphing Structures for Hypersonic Ground Testing Applications

    Data.gov (United States)

    National Aeronautics and Space Administration — Background: Shape morphing, high temperature, ceramic structural materials are now becoming available and can revolutionize ground testing by providing dynamic flow...

  19. 76 FR 73564 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2011-11-29

    ... Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration AGENCIES... Procurement Data System (FPDS). Additionally, changes are proposed for the clauses requiring contractor registration in the Central Contractor Registration (CCR) database and DUNS number reporting. DATES: Interested...

  20. Farm Building Contractors and Manufacturers: Their Role in Midwest Farm Construction

    Science.gov (United States)

    Lyle Solverson; David C. Baumgartner

    1974-01-01

    Describes and analyzes the activities of farm building contractors and manufacturers in Illinois, Indiana, Iowa, and Missouri. Contractors and manufacturers are setting the trend in the farm building market in terms of building type and size and materials used.

  1. Thermal and Fluid Modeling of the CRYogenic Orbital TEstbed (CRYOTE) Ground Test Article (GTA)

    Science.gov (United States)

    Piryk, David; Schallhorn, Paul; Walls, Laurie; Stopnitzky, Benny; Rhys, Noah; Wollen, Mark

    2012-01-01

    The purpose of this study was to anchor thermal and fluid system models to data acquired from a ground test article (GTA) for the CRYogenic Orbital TEstbed - CRYOTE. To accomplish this analysis, it was broken into four primary tasks. These included model development, pre-test predictions, testing support at Marshall Space Flight Center (MSFC} and post-test correlations. Information from MSFC facilitated the task of refining and correlating the initial models. The primary goal of the modeling/testing/correlating efforts was to characterize heat loads throughout the ground test article. Significant factors impacting the heat loads included radiative environments, multi-layer insulation (MLI) performance, tank fill levels, tank pressures, and even contact conductance coefficients. This paper demonstrates how analytical thermal/fluid networks were established, and it includes supporting rationale for specific thermal responses seen during testing.

  2. 77 FR 14490 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor...

    Science.gov (United States)

    2012-03-12

    ... Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel (DFARS Case... (DFARS) to expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Comment Date: Comments on the proposed rule should be...

  3. Advanced stellar compass deep space navigation, ground testing results

    DEFF Research Database (Denmark)

    Betto, Maurizio; Jørgensen, John Leif; Jørgensen, Peter Siegbjørn

    2006-01-01

    Deep space exploration is in the agenda of the major space agencies worldwide and at least the European Space Agency (SMART & Aurora Programs) and the American NASA (New Millennium Program) have set up programs to allow the development and the demonstration of technologies that can reduce the risks...... and the costs of the deep space missions. Navigation is the Achilles' heel of deep space. Being performed on ground, it imposes considerable constraints on the system and the operations, it is very expensive to execute, especially when the mission lasts several years and, above all, it is not failure tolerant...... to determine the orbit of a spacecraft autonomously, on-board and without any a priori knowledge of any kind. The solution is robust, elegant and fast. This paper presents the preliminary performances obtained during the ground tests. The results are very positive and encouraging....

  4. Distribution of ground rigidity and ground model for seismic response analysis in Hualian project of large scale seismic test

    International Nuclear Information System (INIS)

    Kokusho, T.; Nishi, K.; Okamoto, T.; Tanaka, Y.; Ueshima, T.; Kudo, K.; Kataoka, T.; Ikemi, M.; Kawai, T.; Sawada, Y.; Suzuki, K.; Yajima, K.; Higashi, S.

    1997-01-01

    An international joint research program called HLSST is proceeding. HLSST is large-scale seismic test (LSST) to investigate soil-structure interaction (SSI) during large earthquake in the field in Hualien, a high seismic region in Taiwan. A 1/4-scale model building was constructed on the gravelly soil in this site, and the backfill material of crushed stone was placed around the model plant after excavation for the construction. Also the model building and the foundation ground were extensively instrumental to monitor structure and ground response. To accurately evaluate SSI during earthquakes, geotechnical investigation and forced vibration test were performed during construction process namely before/after base excavation, after structure construction and after backfilling. And the distribution of the mechanical properties of the gravelly soil and the backfill are measured after the completion of the construction by penetration test and PS-logging etc. This paper describes the distribution and the change of the shear wave velocity (V s ) measured by the field test. Discussion is made on the effect of overburden pressure during the construction process on V s in the neighbouring soil and, further on the numerical soil model for SSI analysis. (orig.)

  5. Operator/contractor relationships

    International Nuclear Information System (INIS)

    Smith, J.R.; Kidwell, C.K.; Unger, V.E.; Fercho, E.; Helmer, C.M.

    1992-01-01

    In May 1988, Shell Western E and P Inc. (SWEPI) and partners Elf Aquitaine Petroleum and Conoco Inc. signed a letter of intent with Canadian Marine Drilling Ltd. (Canmar) for provision of exploratory drilling and marine services on leases in OCS Lease Sale 109 in the Chukchi Sea, Alaska. The 5450 blocks offered in the remote sale area west of Point Barrow ranged from 3 to 240 miles (5 to 380 km) offshore in water depths from 26 to 263 feet (8 to 80 m). The principal interest tracts were at least 75 miles (120 km) offshore and north of 70 degrees N latitude. The remoteness and total lack of any oilfield infrastructure required considerable planning and coordination between Operator and Contractor in order to carry out the three-year drilling program efficiently and safely in an environmentally harsh and, at the same time, sensitive area. SWEPI and Canmar developed a close working relationship from the start of the project through a number of participative approaches to the problems that had to be solved. This paper reports that these included strong reliance on operational planning meetings, post-season analyses, and an overall emphasis on the teamwork required of both parties to carry out the first-ever drilling program in the Chukchi Sea. This approach led to a very successful operation for both parties and emphasizes the positive benefits achievable when Operator and Contractor work as a team

  6. 77 FR 59339 - Contractor Qualifications

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 209 Contractor Qualifications CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 2 (Parts 201-299), revised as of October 1, 2011, on page 55, in section 209.104-70, paragraph (a) is amended by revising the...

  7. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  8. Development of a Ground Test and Analysis Protocol for NASA's NextSTEP Phase 2 Habitation Concepts

    Science.gov (United States)

    Gernhardt, Michael L.; Beaton, Kara H.; Chappell, Steven P.; Bekdash, Omar S.; Abercromby, Andrew F. J.

    2018-01-01

    The NASA Next Space Technologies for Exploration Partnerships (NextSTEP) program is a public-private partnership model that seeks commercial development of deep space exploration capabilities to support human spaceflight missions around and beyond cislunar space. NASA first issued the Phase 1 NextSTEP Broad Agency Announcement to U.S. industries in 2014, which called for innovative cislunar habitation concepts that leveraged commercialization plans for low-Earth orbit. These habitats will be part of the Deep Space Gateway (DSG), the cislunar space station planned by NASA for construction in the 2020s. In 2016, Phase 2 of the NextSTEP program selected five commercial partners to develop ground prototypes. A team of NASA research engineers and subject matter experts (SMEs) have been tasked with developing the ground-test protocol that will serve as the primary means by which these Phase 2 prototypes will be evaluated. Since 2008, this core test team has successfully conducted multiple spaceflight analog mission evaluations utilizing a consistent set of operational tools, methods, and metrics to enable the iterative development, testing, analysis, and validation of evolving exploration architectures, operations concepts, and vehicle designs. The purpose of implementing a similar evaluation process for the Phase 2 Habitation Concepts is to consistently evaluate different commercial partner ground prototypes to provide data-driven, actionable recommendations for Phase 3. This paper describes the process by which the ground test protocol was developed and the objectives, methods, and metrics by which the NextSTEP Phase 2 Habitation Concepts will be rigorously and systematically evaluated. The protocol has been developed using both a top-down and bottom-up approach. Top-down development began with the Human Exploration and Operations Mission Directorate (HEOMD) exploration objectives and ISS Exploration Capability Study Team (IECST) candidate flight objectives. Strategic

  9. Development of Ground Test System For RKX-200EB

    Science.gov (United States)

    Yudhi Irwanto, Herma

    2018-04-01

    After being postponed for seven years, the development of RKX-200EB now restarts by initiating a ground test, preceding the real flight test. The series of the development starts from simulation test using the real vehicle and its components, focusing on a flight sequence test using hardware in the loop simulation. The result of the simulation shows that the autonomous control system in development is able to control the X tail fin vehicle, since take off using booster, separating booster-sustainer, making flight maneuver using sustainer with average cruise speed of 1000 km/h, and doing bank to maneuver up to ±40 deg heading to the target. The simulation result also shows that the presence of sustainer in vehicle control can expand the distance range by 162% (12.6 km) from its ballistic range using only a booster.

  10. Defense Primer: DOD Contractors

    Science.gov (United States)

    2017-02-10

    functions, from intelligence analysis or software development to landscaping or food service. Why does DOD use individual contractors? Going back to...that provide professional services, from research to management support. The bulk of contractors—more than 70%—provide products, and these include...10 U.S.C. Part IV: Service, Supply, and Procurement. CRS Products CRS In Focus IF10548, Defense Primer: U.S. Defense Industrial Base, by Daniel

  11. Electric Ground Support Equipment at Airports

    Energy Technology Data Exchange (ETDEWEB)

    2017-12-12

    Airport ground support equipment (GSE) is used to service airplanes between flights. Services include refueling, towing airplanes or luggage/freight carts, loading luggage/freight, transporting passengers, loading potable water, removing sewage, loading food, de-icing airplanes, and fire-fighting. Deploying new GSE technologies is a promising opportunity in part because the purchasers are generally large, technologically sophisticated airlines, contractors, or airports with centralized procurement and maintenance departments. Airlines could particularly benefit from fuel diversification since they are highly exposed to petroleum price volatility. GSE can be particularly well-suited for electrification because it benefits from low-end torque and has frequent idle time and short required ranges.

  12. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    Science.gov (United States)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  13. 48 CFR 1845.7101-5 - Contractor's privileged financial and business information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor's privileged financial and business information. 1845.7101-5 Section 1845.7101-5 Federal Acquisition Regulations System... 1845.7101-5 Contractor's privileged financial and business information. If a transfer of property...

  14. 77 FR 10461 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2012-02-22

    ... Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise Tax AGENCIES.... Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in order to... payment. Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in...

  15. Longevity of Emplacement Drift Ground Support Materials

    International Nuclear Information System (INIS)

    Tang, D.

    2000-01-01

    The purpose of this analysis is to evaluate the factors affecting the longevity of emplacement drift ground support materials and to develop a basis for selection of materials for ground support that will function throughout the preclosure period. The Development Plan (DP) for this analysis is given in CRWMS M and O (Civilian Radioactive Waste Management System Management and Operating Contractor) (1999a). The candidate materials for ground support are steel (carbon steel, ductile cast iron, galvanized steel, and stainless steel, etc.) and cement. Steel will mainly be used for steel sets, lagging, channels, rock bolts, and wire mesh. Cement usage is only considered in the case of grouted rock bolts. The candidate materials for the invert structure are steel and crushed rock ballast. The materials shall be evaluated for the repository emplacement drift environment under a specific thermal loading condition based on the proposed License Application Design Selection (LADS) design. The analysis consists of the following tasks: (1) Identify factors affecting the longevity of ground control materials for use in emplacement drifts. (2) Review existing documents concerning behavior of candidate ground control materials during the preclosure period. The major criteria to be considered for steel are mechanical and thermal properties, and durability, of which corrosion is the most important concern. (3) Evaluate the available results and develop recommendations for material(s) to be used

  16. SRS Burial Ground Complex: Remediation in Progress

    International Nuclear Information System (INIS)

    Griffin, M.; Crapse, B.; Cowan, S.

    1998-01-01

    Closure of the various areas in the Burial Ground Complex (BGC) represents a major step in the reduction of risk at the Savannah River Site (SRS) and a significant investment of resources. The Burial Ground Complex occupies approximately 195 acres in the central section of the SRS. Approximately 160 acres of the BGC consists of hazardous and radioactive waste disposal sites that require remediation. Of these source acres, one-third have been remediated while two-thirds are undergoing interim or final action. These restoration activities have been carried out in a safe and cost effective manner while minimizing impact to operating facilities. Successful completion of these activities is in large part due to the teamwork demonstrated by the Department of Energy, contractor/subcontractor personnel, and the regulatory agencies. The experience and knowledge gained from the closure of these large disposal facilities can be used to expedite closure of similar facilities

  17. A study on the nondestructive test optimum design for a ground tracked combat vehicle

    Energy Technology Data Exchange (ETDEWEB)

    Kim Byeong Ho; Seo, Jae Hyun; Gil, Hyeon Jun [Defence Agency for Technology and Quality, Seoul (Korea, Republic of); Kim, Seon Hyeong [Hanwha Techwin Co.,Ltd., Changwon (Korea, Republic of); Seo, Sang Chul [Changwon National University, Changwon (Korea, Republic of)

    2015-10-15

    In this study, a nondestructive test (NDT) is performed to inspect the optimal design of a ground tracked combat vehicle for self-propelled artillery, tank, and armored vehicles. The minimum qualification required for personnel performing the NDT of a ground tracked combat vehicle was initially established in US military standards, and then applied to the Korean defense specifications to develop a ground tracked combat vehicle. However, the qualification standards of an NDT inspector have been integrated into NAS410 through the military and commercial specifications unification project that were applied in the existing aerospace/defense industry public standard. The design method for this study was verified by applying the optimal design to the liquid penetrant testing Al forging used in self-propelled artillery. This confirmed the reliability and soundness of the product.

  18. 76 FR 52378 - Privacy Act; System of Records: State-76, Personal Services Contractor Records

    Science.gov (United States)

    2011-08-22

    ... Services Contractor Records SUMMARY: Notice is hereby given that the Department of State proposes to create a new system of records, Personal Services Contractor Records, State-76, pursuant to the provisions... July 20, 2011. It is proposed that the new system be named ``Personal Services Contractor Records.'' It...

  19. 48 CFR 225.7303-1 - Contractor sales to other foreign customers.

    Science.gov (United States)

    2010-10-01

    ... foreign customers. 225.7303-1 Section 225.7303-1 Federal Acquisition Regulations System DEFENSE... for Foreign Military Sales 225.7303-1 Contractor sales to other foreign customers. If the contractor has made sales of the item required for the foreign military sale to foreign customers under...

  20. Development and validation of a strategic repositioning model for defense and aerospace contractors

    Science.gov (United States)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing

  1. Large scale vibration tests on pile-group effects using blast-induced ground motion

    International Nuclear Information System (INIS)

    Katsuichirou Hijikata; Hideo Tanaka; Takayuki Hashimoto; Kazushige Fujiwara; Yuji Miyamoto; Osamu Kontani

    2005-01-01

    Extensive vibration tests have been performed on pile-supported structures at a large-scale mining site. Ground motions induced by large-scale blasting operations were used as excitation forces for vibration tests. The main objective of this research is to investigate the dynamic behavior of pile-supported structures, in particular, pile-group effects. Two test structures were constructed in an excavated 4 m deep pit. Their test-structures were exactly the same. One structure had 25 steel piles and the other had 4 piles. The test pit was backfilled with sand of appropriate grain size distributions to obtain good compaction, especially between the 25 piles. Accelerations were measured at the structures, in the test pit and in the adjacent free field, and pile strains were measured. Dynamic modal tests of the pile-supported structures and PS measurements of the test pit were performed before and after the vibration tests to detect changes in the natural frequencies of the soil-pile-structure systems and the soil stiffness. The vibration tests were performed six times with different levels of input motions. The maximum horizontal acceleration recorded at the adjacent ground surface varied from 57 cm/s 2 to 1,683 cm/s 2 according to the distances between the test site and the blast areas. (authors)

  2. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Contractor's Requisition-Project...

    Science.gov (United States)

    2011-03-11

    ... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...

  3. Private security and military contractors: A troubling oversight

    DEFF Research Database (Denmark)

    Swed, Ori; Crosbie, Thomas Alexander

    2017-01-01

    Though private military and security companies (PMSCs) have been addressed extensively in the literature, little research has been done on the contractors themselves, leaving us in the dark as to who these individuals are. In this article, we focus on the critical case of the United States armed...... and concomitant evolution of the security sector, while noting a new trend that points to the need for moving from the macrosocial to the microsocial level of inquiry. Second, we indicate the challenges contractors pose to the sociological paradigm of military professionalism: These suggest a need to move from...

  4. Contractor Past Performance - Are We There Yet?

    National Research Council Canada - National Science Library

    Guerrero, Juan

    2001-01-01

    During the United States federal government acquisition reform movement of the 1990s, the government strongly emphasized the use of past performance information to select contractors in federal procurements...

  5. Use of Ground Penetrating Radar at the FAA's National Airport Pavement Test Facility

    Science.gov (United States)

    Injun, Song

    2015-04-01

    The Federal Aviation Administration (FAA) in the United States has used a ground-coupled Ground Penetrating Radar (GPR) at the National Airport Pavement Test Facility (NAPTF) since 2005. One of the primary objectives of the testing at the facility is to provide full-scale pavement response and failure information for use in airplane landing gear design and configuration studies. During the traffic testing at the facility, a GSSI GPR system was used to develop new procedures for monitoring Hot Mix Asphalt (HMA) pavement density changes that is directly related to pavement failure. After reviewing current setups for data acquisition software and procedures for identifying different pavement layers, dielectric constant and pavement thickness were selected as dominant parameters controlling HMA properties provided by GPR. A new methodology showing HMA density changes in terms of dielectric constant variations, called dielectric sweep test, was developed and applied in full-scale pavement test. The dielectric constant changes were successfully monitored with increasing airplane traffic numbers. The changes were compared to pavement performance data (permanent deformation). The measured dielectric constants based on the known HMA thicknesses were also compared with computed dielectric constants using an equation from ASTM D4748-98 Standard Test Method for Determining the Thickness of Bound Pavement Layers Using Short-Pulse Radar. Six inches diameter cylindrical cores were taken after construction and traffic testing for the HMA layer bulk specific gravity. The measured bulk specific gravity was also compared to monitor HMA density changes caused by aircraft traffic conditions. Additionally this presentation will review the applications of the FAA's ground-coupled GPR on embedded rebar identification in concrete pavement, sewer pipes in soil, and gage identifications in 3D plots.

  6. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-10-29

    ...; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department... previously approved information collection requirement concerning contractor use of interagency fleet... comments identified by Information Collection 9000- 0032, Contractor Use of Interagency Fleet Management...

  7. Improving UK client-contractor relations

    International Nuclear Information System (INIS)

    Brant, A.W.

    1996-01-01

    The client's aim in any decommissioning project is that the originally intended end point is achieved, within budget and on time. The contractor's aim is to have a satisfied client, so that both are happy to work together again, and to have a reasonable return for his efforts. How can these - not incompatible - aims best be achieved? (UK)

  8. Monitoring of natural revegetation of Semipalatinsk nuclear testing ground

    International Nuclear Information System (INIS)

    Sultanova, B.M.

    2002-01-01

    It is well known, that monitoring of natural revegetation of Semipalatinsk test site (STS) was carried out during period 1994-2002 at test areas (Experimental field, Balapan, Degelen). In this paper the peculiarities of vegetation cover of these test areas are observed. Thus, vegetation cover of Experimental field ground in the epicentre is completely destroyed. At present there are different stages of zonal steppe communities rehabilitation: in zones with γ-irradiation 11000-14000 μR/h the revegetation is not found; on the plots with γ-irradiation 8200-10000 μR/h rare species of Artemisia frigida are found; aggregation of plant (managed from 6000-7000 μR/h is observed; At the γ-irradiation 80-200 μR/h rarefied groups of bunch grass communities similar to the zonal steppe are formed and zonal bunch grass communities developed with 18-25 μR/h. Vegetation cover of Degelen hill tops and near-mouth ground in the results of underground nuclear expulsions are completely destroyed. Here there are three main kinds of vegetation: very stony gallery areas don't almost overgrow; at technogen tops near galleries the single plants, rare field groups and unclosed micro-phyto-biocenoses of weed and adventive species (Amaranthus retroflexus, Artemisia dracunculus, Laxctuca serriola, Chorispora sibirica etc.). On the Balapan are the revegetation is limited by high radiation pollution rate. Here cenose rehabilitation is presented by Artemisia marshalliana, Spita sareptana, Festuca valresiaca). In their paper florostic and phyrocoenitic diversity of STS's flora transformation is studied. Pattern distribution and migration of radionuclides in soils and vegetation cover is represented

  9. 75 FR 10267 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Motor...

    Science.gov (United States)

    2010-03-05

    ... ADMINISTRATION [OMB Control No. 9000-0032] Federal Acquisition Regulation; Submission for OMB Review; Contractor... previously approved information collection requirement concerning contractor use of interagency motor pool... contracting officer may authorize cost-reimbursement contractors to obtain, for official purposes only...

  10. 77 FR 63835 - Office of the Chief Information Officer; Submission for OMB Review; Temporary Contractor...

    Science.gov (United States)

    2012-10-17

    ... of the Chief Information Officer; Submission for OMB Review; Temporary Contractor Information... information collection requirement regarding temporary contractor information worksheet. A notice was... for temporary contractors as a result of the American Recovery and Reinvestment Act of 2009 (Public...

  11. institutional and resource constraints that inhibit contractor ...

    African Journals Online (AJOL)

    p2333147

    Keywords: Institutions; small-scale contractor performance; sugar industry. ABSTRACT ..... diverse cultural settings, women, specifically widowed or single women, have a .... constraints on business growth, such as the work limitations placed.

  12. CONTRACTORS OF SOCIALIZATION AND THEIR INFLUENCE ON SOCIAL PROCESSES

    OpenAIRE

    Mikhail Yu. POPOV

    2016-01-01

    This article is devoted to the analysis of an essence of the concept "contractors of socialization" and attempt of definition of its place in structure of sociological knowledge. During the solution of this task the author seeks to define destructive nature of influence of contractors of socialization on formation of the personality both at a stage of primary socialization, and in the course of the entire period of its activity. Inclusion of this term in structure of sociological knowledge, a...

  13. 78 FR 13547 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel

    Science.gov (United States)

    2013-02-28

    ... Contractor Personnel AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION... (FY) 2009 and expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Effective February 28, 2013. FOR FURTHER INFORMATION...

  14. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-10-01

    A fundamental premise of the Nuclear Regulatory Commission's (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The total government-industry system for the inspection of commercial nuclear facilities has been designed to provide for multiple levels of inspection and verification. Licensees, contractors, and vendors each participate in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 Code of Federal Regulations). The NRC performs an overview of the commercial nuclear industry by inspection to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of ongoing quality verification programs

  15. Environmental assessment of SP-100 ground engineering system test site: Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1988-12-01

    The US Department of Energy (DOE) proposes to modify an existing reactor containment building (decommissioned Plutonium Recycle Test Reactor (PRTR) 309 Building) to provide ground test capability for the prototype SP-100 reactor. The 309 Building (Figure 1.1) is located in the 300 Area on the Hanford Site in Washington State. The National Environmental Policy Act (NEPA) requires that Federal agencies assess the potential impacts that their actions may have on the environment. This Environmental Assessment describes the consideration given to environmental impacts during reactor concept and test site selection, examines the environmental effects of the DOE proposal to ground test the nuclear subsystem, describes alternatives to the proposed action, and examines radiological risks of potential SP-100 use in space. 73 refs., 19 figs., 7 tabs.

  16. 78 FR 6189 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2013-01-29

    ... 9000-AM13 Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor... contractor in order to reimburse the tax imposed (26 U.S.C. 5000C Note). On February 22, 2012, DoD, GSA, and... with the statute, FAR 31.205-41 is amended to inform the Government and contractors that the costs of...

  17. International Markets: Malaysian Construction Contractors and the Stage Theory

    Directory of Open Access Journals (Sweden)

    Ahmed Awil

    2012-11-01

    Full Text Available Reduced demand for services, lack of finances for projects and idle resources at homehave resulted in loss of business for Malaysian construction contractors. Among the optionsthat are explored in this paper is internationalisation of services to help the contractorsgainfully employ their resources and diversify their markets. Integration of worldmarkets, faster transportation and improved means of communication have made it possiblefor contractors to undertake work in international markets. It was found that contractorswere motivated to internationalise by need to make the firm a viable one byconsidering the long-term profitability. Reputation and size of the firm were found to befactors that help contractors in winning contracts overseas. Most non-exporters were concernedwith provision of market intelligence and export credit finance. It was found thatproviding relevant market information, accessible to both exporter and non-exporters, canhelp firms make informed decisions. Any assistance provided should match the firm to thestage the firm has reached in exporting

  18. Government/contractor partnerships for continuous improvement. A Goddard Space Flight Center example

    Science.gov (United States)

    Tagler, Richard C.

    1992-01-01

    The efforts of a government organization and its major contractors to foster a continuous improvement environment which transcends the traditional government/contractor relationship is discussed. This relationship is aimed at communication, partnership, and trust - creating benefits for all involved.

  19. 77 FR 20051 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2012-04-03

    ... Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor Pursuant to... ``Procedural Guidelines for the Maintenance of the List of Products Requiring Federal Contractor Certification... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor...

  20. 75 FR 28771 - Federal Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor...

    Science.gov (United States)

    2010-05-24

    ... Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor Personnel AGENCIES... of collecting from contractors all forms of Government provided identification once they are no..., titled Controls Over the Contractor Common Access Card (CAC) Life Cycle, was performed to determine...

  1. 77 FR 65927 - 60-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Science.gov (United States)

    2012-10-31

    ... of Language Services Contractor Application Form ACTION: Notice of request for public comment... Collection: Office of Language Services Contractor Application Form. OMB Control Number: 1405-0191. Type of... become contractors for the U.S. Department of State, Office of Language Services, the information...

  2. 78 FR 13394 - 30-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Science.gov (United States)

    2013-02-27

    ... of Language Services Contractor Application Form ACTION: Notice of request for public comment and...: Title of Information Collection: Office of Language Services Contractor Application Form. OMB Control... States. If candidates successfully become contractors for the U.S. Department of State, Office of...

  3. 42 CFR 405.1012 - When CMS or its contractors may be a party to a hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may be a party to a... Hearings § 405.1012 When CMS or its contractors may be a party to a hearing. (a) CMS and/or one or more of... unrepresented beneficiary. (b) CMS and/or the contractor(s) advises the ALJ, appellant, and all other parties...

  4. Assessing Contractor Capabilities for Streamlined Site Investigations

    Science.gov (United States)

    The purpose of this document is to familiarize and encourage brownfields decision makers to investigate and employ innovative methods for characterizing their sites, to assist brownfields decision makers in assessing contractors' capabilities.

  5. Saturn V First Stage Lowered to the Ground After Static Test

    Science.gov (United States)

    1966-01-01

    This vintage photograph shows the 138-foot long first stage of the Saturn V being lowered to the ground following a successful static test firing at Marshall Space flight Center's S-1C test stand. The firing provided NASA engineers information on the booster's systems. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  6. Commissioning of the Ground Test Accelerator RFQ

    International Nuclear Information System (INIS)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H - injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2βγ Drift Tube Linac (DTL-1) module, the 8.7 MeV 2βγ DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations

  7. Commissioning of the ground test accelerator RFQ

    International Nuclear Information System (INIS)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Garnott, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohsen, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Sandoval, D.P.; Saadatmand, K.; Stevens, R.R.Jr.; Vaughn, G.; Wadlinger, E.A.; Yuan, V.; Connolly, R.; Weiss, R.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on line. The commissioning stages are the 35-keV H - injector, the 2.5-MeV radio-frequency quadrupole (RFQ), the intertank matching section (IMS), the 3.2-MeV first 2-βλ drift tube linac (DTL-1) module, the 8.7-MeV 2-βλDTL (modules 1-5), and the 24-MeV GTA (all 10 DTL modules). Commissioning results from the RFQ beam experiments are presented along with comparisons with simulations. (Author) 8 refs., 9 figs

  8. 76 FR 31365 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2011-05-31

    ... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor... Contractor Certification as to Forced or Indentured Child Labor.'' This notice adds a product, hand-woven... of the List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child...

  9. Aerothermal Ground Testing of Flexible Thermal Protection Systems for Hypersonic Inflatable Aerodynamic Decelerators

    Science.gov (United States)

    Bruce, Walter E., III; Mesick, Nathaniel J.; Ferlemann, Paul G.; Siemers, Paul M., III; DelCorso, Joseph A.; Hughes, Stephen J.; Tobin, Steven A.; Kardell, Matthew P.

    2012-01-01

    Flexible TPS development involves ground testing and analysis necessary to characterize performance of the FTPS candidates prior to flight testing. This paper provides an overview of the analysis and ground testing efforts performed over the last year at the NASA Langley Research Center and in the Boeing Large-Core Arc Tunnel (LCAT). In the LCAT test series, material layups were subjected to aerothermal loads commensurate with peak re-entry conditions enveloping a range of HIAD mission trajectories. The FTPS layups were tested over a heat flux range from 20 to 50 W/cm with associated surface pressures of 3 to 8 kPa. To support the testing effort a significant redesign of the existing shear (wedge) model holder from previous testing efforts was undertaken to develop a new test technique for supporting and evaluating the FTPS in the high-temperature, arc jet flow. Since the FTPS test samples typically experience a geometry change during testing, computational fluid dynamic (CFD) models of the arc jet flow field and test model were developed to support the testing effort. The CFD results were used to help determine the test conditions experienced by the test samples as the surface geometry changes. This paper includes an overview of the Boeing LCAT facility, the general approach for testing FTPS, CFD analysis methodology and results, model holder design and test methodology, and selected thermal results of several FTPS layups.

  10. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    International Nuclear Information System (INIS)

    Chockie, Alan

    2005-09-01

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  11. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    Energy Technology Data Exchange (ETDEWEB)

    Chockie, Alan [Chockie Group International, Inc., Seattle, WA (United States)

    2005-09-15

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  12. Seismic Data for Evaluation of Ground Motion Hazards in Las Vegas in Support of Test Site Readiness Ground Motion

    Energy Technology Data Exchange (ETDEWEB)

    Rodgers, A

    2008-01-16

    In this report we describe the data sets used to evaluate ground motion hazards in Las Vegas from nuclear tests at the Nevada Test Site. This analysis is presented in Rodgers et al. (2005, 2006) and includes 13 nuclear explosions recorded at the John Blume and Associates network, the Little Skull Mountain earthquake and a temporary deployment of broadband station in Las Vegas. The data are available in SAC format on CD-ROM as an appendix to this report.

  13. A Field Test of Electromigration as a Method for Remediating Sulfate from Shallow Ground Water

    Science.gov (United States)

    Patterson, C.G.; Runnells, D.D.

    1996-01-01

    Electromigration offers a potential tool for remediating ground water contaminated with highly soluble components, such as Na+, Cl-, NO3-, and SO4-. A field experiment was designed to test the efficacy of electromigration for preconcentrating dissolved SO42- in ground water associated with a fossil-fuel power plant. Two shallow wells, 25 feet apart (one 25 feet deep, the other 47 feet deep), were constructed in the upper portion of an unconfined alluvial aquifer. The wells were constructed with a double-wall design, with an outer casing of 4-inch PVC and an inner tube of 2-inch PVC; both were fully slotted (0.01 inch). Electrodes were constructed by wrapping the inner tubing with a 100-foot length of rare-earth metal oxide/copper wire. An electrical potential of 10.65 volts DC was applied, and tests were run for periods of 12, 44, and 216 hours. Results showed large changes in the pH from the initial pH of ground water of about 7.5 to values of approximately 2 and 12 at the anode and cathode, respectively. Despite the fact that the test conditions were far from ideal, dissolved SO42- was significantly concentrated at the anode. Over a period of approximately nine days, the concentration of SO42- at the anode reached what appeared to be a steady-state value of 2200 mg/L, compared to the initial value in ground water of approximately 1150 mg/L. The results of this field test should encourage further investigation of electromigration as a tool in the remediation of contaminated ground water.

  14. X-43A Vehicle During Ground Testing

    Science.gov (United States)

    1999-01-01

    The X-43A Hypersonic Experimental Vehicle, or 'Hyper-X' is seen here undergoing ground testing at NASA's Dryden Flight Research Center, Edwards, California in December 1999. The X-43A was developed to research a dual-mode ramjet/scramjet propulsion system at speeds from Mach 7 up to Mach 10 (7 to 10 times the speed of sound, which varies with temperature and altitude). Hyper-X, the flight vehicle for which is designated as X-43A, is an experimental flight-research program seeking to demonstrate airframe-integrated, 'air-breathing' engine technologies that promise to increase payload capacity for future vehicles, including hypersonic aircraft (faster than Mach 5) and reusable space launchers. This multiyear program is currently underway at NASA Dryden Flight Research Center, Edwards, California. The Hyper-X schedule calls for its first flight later this year (2000). Hyper-X is a joint program, with Dryden sharing responsibility with NASA's Langley Research Center, Hampton, Virginia. Dryden's primary role is to fly three unpiloted X-43A research vehicles to validate engine technologies and hypersonic design tools as well as the hypersonic test facility at Langley. Langley manages the program and leads the technology development effort. The Hyper-X Program seeks to significantly expand the speed boundaries of air-breathing propulsion by being the first aircraft to demonstrate an airframe-integrated, scramjet-powered free flight. Scramjets (supersonic-combustion ramjets) are ramjet engines in which the airflow through the whole engine remains supersonic. Scramjet technology is challenging because only limited testing can be performed in ground facilities. Long duration, full-scale testing requires flight research. Scramjet engines are air-breathing, capturing their oxygen from the atmosphere. Current spacecraft, such as the Space Shuttle, are rocket powered, so they must carry both fuel and oxygen for propulsion. Scramjet technology-based vehicles need to carry only

  15. Ground testing and simulation. II - Aerodynamic testing and simulation: Saving lives, time, and money

    Science.gov (United States)

    Dayman, B., Jr.; Fiore, A. W.

    1974-01-01

    The present work discusses in general terms the various kinds of ground facilities, in particular, wind tunnels, which support aerodynamic testing. Since not all flight parameters can be simulated simultaneously, an important problem consists in matching parameters. It is pointed out that there is a lack of wind tunnels for a complete Reynolds-number simulation. Using a computer to simulate flow fields can result in considerable reduction of wind-tunnel hours required to develop a given flight vehicle.

  16. Operations Strategy and –Innovation? -A Contractor Implementing Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Simonsen, Rolf

    2006-01-01

    Traditional strategic management and operations strategy wants us to believe that the implementation of management concepts is a simple strategic choice made by top managers. In this paper we introduce the story of Lean Construction entering into the organisation of a Danish contractor. Lean...... concepts. The paper presents findings from empirical work in collaboration with a large Danish contractor. The case is analysed from the perspective of operation strategy and political process. It is observed how the management concept is socially constructed and negotiated through political action of key...

  17. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Science.gov (United States)

    2012-06-15

    .... The essence of the definition cannot be changed substantially in the DFARS from that in the... recommended that the final rule define the contractor's obligation to cooperate, as in the mandatory... define the scope and limitations of the contractor's obligation to cooperate with Government...

  18. 29 CFR 471.16 - Under what circumstances may a contractor be reinstated?

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement... 29 Labor 2 2010-07-01 2010-07-01 false Under what circumstances may a contractor be reinstated...

  19. First in situ operation performance test of ground source heat pump in Tunisia

    International Nuclear Information System (INIS)

    Naili, Nabiha; Attar, Issam; Hazami, Majdi; Farhat, Abdelhamid

    2013-01-01

    Highlights: • Evaluate the geothermal energy in Tunisia. • Study of the performance of GSHP system for cooling space. • GSHP is a promising alternative for building cooling in Tunisia. - Abstract: The main purpose of this paper is to study the energetic potential of the deployment in Tunisia of the Ground Source Heat Pump (GSHP) system for cooling mode application. Therefore, a pilot GSHP system using horizontal Ground Heat Exchanger (GHE) was installed and experimented in the Research and Technology Center of Energy (CRTEn), Borj Cédria. The experiment is conducted in a test room with a floor area of about 12 m 2 . In the floor of the tested room is integrated a polyethylene exchanger (PEX) used as a radiant floor cooling (RFC) system. The experimental setup mainly includes the ground temperature, the temperature and flow rate of water circulating in the heat pump and the GHE, as well as the power consumption of the heat pump and circulating pumps. These experimental data are essentially used to evaluate the coefficient of performance of the heat pump (COP hp ) and the overall system (COP sys ) for continuous operation mode. The COP hp and the COP sys were found to be 4.25 and 2.88, respectively. These results reveal that the use of the ground source heat pump is very appropriate for Tunisian building cooling

  20. Concept study of a hydrogen containment process during nuclear thermal engine ground testing

    Directory of Open Access Journals (Sweden)

    Ten-See Wang

    Full Text Available A new hydrogen containment process was proposed for ground testing of a nuclear thermal engine. It utilizes two thermophysical steps to contain the hydrogen exhaust. First, the decomposition of hydrogen through oxygen-rich combustion at higher temperature; second, the recombination of remaining hydrogen with radicals at low temperature. This is achieved with two unit operations: an oxygen-rich burner and a tubular heat exchanger. A computational fluid dynamics methodology was used to analyze the entire process on a three-dimensional domain. The computed flammability at the exit of the heat exchanger was less than the lower flammability limit, confirming the hydrogen containment capability of the proposed process. Keywords: Hydrogen decomposition reactions, Hydrogen recombination reactions, Hydrogen containment process, Nuclear thermal propulsion, Ground testing

  1. 48 CFR 2945.104 - Review and correction of contractors' property control systems.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Review and correction of... contractors' property control systems. When the Government's property administrator determines that review and... administrator must review the system to determine whether the contractor will be able to meet the requirements...

  2. Examining the Dynamics of Novation from the Principal Contractor's and Architect's Perspectives

    Directory of Open Access Journals (Sweden)

    Alan Griffith

    2012-11-01

    Full Text Available Design and build is a popular form of procurement worldwide. In its conventional form, it is characterised by the integration between design and construction. Novation, a variant of design and build where design responsibility is transferred from designer to contractor as procurement evolves, has gained in popularity. However, the characteristics of the process, although well identified, continue to create confusion and problems for clients and contractors alike. This paper focuses on the dynamics of design and build novation from the principal contractor's and architect's perspectives. It embraces key aspects of both the pre-contract and post-contract environment. Its contribution forms a part of a major UK Government funded research project investigating design and build best practice. The findings presented in this paper broadly indicate that contractors believe novated design and build can be disadvantageous and that considerable fragmentation can be created in what should be an integrated procurement approach.

  3. USB environment measurements based on full-scale static engine ground tests

    Science.gov (United States)

    Sussman, M. B.; Harkonen, D. L.; Reed, J. B.

    1976-01-01

    Flow turning parameters, static pressures, surface temperatures, surface fluctuating pressures and acceleration levels were measured in the environment of a full-scale upper surface blowing (USB) propulsive lift test configuration. The test components included a flightworthy CF6-50D engine, nacelle, and USB flap assembly utilized in conjunction with ground verification testing of the USAF YC-14 Advanced Medium STOL Transport propulsion system. Results, based on a preliminary analysis of the data, generally show reasonable agreement with predicted levels based on model data. However, additional detailed analysis is required to confirm the preliminary evaluation, to help delineate certain discrepancies with model data, and to establish a basis for future flight test comparisons.

  4. Process waste assessment approach, training and technical assistance for DOE contractors

    International Nuclear Information System (INIS)

    Pemberton, S.

    1994-03-01

    The Department of Energy (DOE) and its contractors are faced with a large waste management problem as are other industries. One of the tools used in a successful waste minimization pollution prevention (WMin/P2) program is a process waste assessment (PWA). The purpose of this project was to share the Kansas City Plant's (KCP's) PWA expertise with other DOE personnel and DOE contractors. This consisted of two major activities: (1) The KCP's PWA graded approach methodology was modified with the assistance of DOE/Defense Program's laboratories, and (2) PWA training and technical assistance were provided to interested DOE personnel and DOE contractors. This report documents the FY93 efforts, lesson learned, and future plans for both PWA-related activities

  5. Excessive Profits of German Defense Contractors

    Science.gov (United States)

    2014-09-01

    its business unit Thyssen Krupp Marine Systems, is a German defense contractor. (2) Tognom AG Tognum AG owned the MTU Friedrichshafen GmbH before... Friedrichshafen provided engines for many ships of the German Navy and for German battle tanks, such as the Leopard I and Leopard II. MTU refers to the

  6. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-01-01

    Full Text Available The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB project in China is used to demonstrate how to apply these two methods and their advantages.

  7. Field Guide for Testing Existing Photovoltaic Systems for Ground Faults and Installing Equipment to Mitigate Fire Hazards

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, William [Brooks Engineering, Vacaville, CA (United States); Basso, Thomas [National Renewable Energy Lab. (NREL), Golden, CO (United States); Coddington, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-10-01

    Ground faults and arc faults are the two most common reasons for fires in photovoltaic (PV) arrays and methods exist that can mitigate the hazards. This report provides field procedures for testing PV arrays for ground faults, and for implementing high resolution ground fault and arc fault detectors in existing and new PV system designs.

  8. 42 CFR 405.1010 - When CMS or its contractors may participate in an ALJ hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may participate in an... Hearings § 405.1010 When CMS or its contractors may participate in an ALJ hearing. (a) An ALJ may request, but may not require, CMS and/or one or more of its contractors to participate in any proceedings...

  9. Occupational dose reduction at Department of Energy contractor facilities: Study of ALARA programs

    International Nuclear Information System (INIS)

    Dionne, B.J.; Meinhold, C.B.; Khan, T.A.; Baum, J.W.

    1992-03-01

    This report provides the US Department of Energy (DOE) and its contractors with information that will be useful for reducing occupational radiation doses at DOE's nuclear facilities. In 1989 and 1990, health physicists from the Brookhaven National Laboratory's (BNL) ALARA Center visited twelve DOE contractor facilities with annual collective dose equivalents greater than 100 person-rem (100 person-cSv). The health physicists interviewed radiological safety staff, engineers, and training personnel who were responsible for dose control. The status of ALARA practices at the major contractor facilities was compared with the requirements and recommendation in DOE Order 5480.11 ''Radiation Protection for Occupational Workers'' and PNL-6577 ''Health Physics Manual of Good Practices for Reducing Radiation Exposure to Levels that are as Low as Reasonably Achievable.'' The information and data collected are described and examples of successful practices are presented. The findings on the status of the DOE Contractor ALARA Programs are summarized and evaluated. In addition, the supplement to this report contains examples of good-practice documents associated with implementing the major elements of a formally documented ALARA program for a major DOE contractor facility

  10. Summary of ground motion prediction results for Nevada Test Site underground nuclear explosions related to the Yucca Mountain project

    International Nuclear Information System (INIS)

    Walck, M.C.

    1996-10-01

    This report summarizes available data on ground motions from underground nuclear explosions recorded on and near the Nevada Test Site, with emphasis on the ground motions recorded at stations on Yucca Mountain, the site of a potential high-level radioactive waste repository. Sandia National Laboratories, through the Weapons Test Seismic Investigations project, collected and analyzed ground motion data from NTS explosions over a 14-year period, from 1977 through 1990. By combining these data with available data from earlier, larger explosions, prediction equations for several ground motion parameters have been developed for the Test Site area for underground nuclear explosion sources. Also presented are available analyses of the relationship between surface and downhole motions and spectra and relevant crustal velocity structure information for Yucca Mountain derived from the explosion data. The data and associated analyses demonstrate that ground motions at Yucca Mountain from nuclear tests have been at levels lower than would be expected from moderate to large earthquakes in the region; thus nuclear explosions, while located relatively close, would not control seismic design criteria for the potential repository

  11. Summary of ground motion prediction results for Nevada Test Site underground nuclear explosions related to the Yucca Mountain project

    Energy Technology Data Exchange (ETDEWEB)

    Walck, M.C.

    1996-10-01

    This report summarizes available data on ground motions from underground nuclear explosions recorded on and near the Nevada Test Site, with emphasis on the ground motions recorded at stations on Yucca Mountain, the site of a potential high-level radioactive waste repository. Sandia National Laboratories, through the Weapons Test Seismic Investigations project, collected and analyzed ground motion data from NTS explosions over a 14-year period, from 1977 through 1990. By combining these data with available data from earlier, larger explosions, prediction equations for several ground motion parameters have been developed for the Test Site area for underground nuclear explosion sources. Also presented are available analyses of the relationship between surface and downhole motions and spectra and relevant crustal velocity structure information for Yucca Mountain derived from the explosion data. The data and associated analyses demonstrate that ground motions at Yucca Mountain from nuclear tests have been at levels lower than would be expected from moderate to large earthquakes in the region; thus nuclear explosions, while located relatively close, would not control seismic design criteria for the potential repository.

  12. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    Science.gov (United States)

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  13. Ground-water data for the Nevada Test Site and selected other areas in South-Central Nevada, 1992--1993

    International Nuclear Information System (INIS)

    1995-01-01

    The US Geological Survey, in support of the US Department of Energy Environmental Restoration and Hydrologic Resources Management Programs, collects and compiles hydrogeologic data to aid in characterizing the regional and local ground-water flow systems underlying the Nevada Test Site and vicinity. This report presents selected ground-water data collected from wells and test holes at and in the vicinity of the Nevada Test Site. Depth-to-water measurements were made during water year 1993 at 55 sites at the Nevada Test Site and 43 regional sites in the vicinity of the Nevada Test Site. Depth to water ranged from 87.7 to 674.6 meters below land surface at the Nevada Test Site and from 6.0 to 444.7 meters below land surface at sites in the vicinity of the Nevada Test Site. Depth-to-water measurements were obtained using the wire-line, electric-tape, air-line, and steel-tape devices. Total measured ground-water withdrawal from the Nevada Test Site during the 1993 calendar year was 1,888.04 million liters. Annual ground-water withdrawals from 14 wells ranged from 0.80 million to 417.20 million liters. Tritium concentrations from four samples at the Nevada Test Site and from three samples in the vicinity of the Nevada Test Site collected during water year 1993 ranged from near 0 to 27,676.0 becquerels per liter and from near 0 to 3.9 becquerels per liter, respectively

  14. Information for contractors' staff

    CERN Multimedia

    The Dosimetry Service

    2005-01-01

    We have observed a significant decrease in the number of completed Certificates for Work in Controlled Radiation Areas being submitted with applications for dosimeters for your staff. Henceforth, we shall no longer be able to issue dosimeters without a certificate, which must be signed by the employee and the contractor's radiation-protection expert. You can obtain the certificate form from the Dosimetry Service at Building 24/E-011 or from our Website: http://service-rp-dosimetry.web.cern.ch/service-rp-dosimetry/. Thank you for your understanding. The Dosimetry Service

  15. 75 FR 33237 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-06-11

    ... Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025) AGENCY: Defense.../Pension Review from Procedures, Guidance, and Information to the Defense Acquisition Regulation Supplement..., February 23, 2006, moved requirements for Contractor Insurance/Pension Review (CIPR) from DFARS 242.7302 to...

  16. Low-Level Burial Grounds Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1989-01-01

    The single dangerous waste permit identification number issued to the Hanford Site by the US Environmental Protection Agency and the Washington State Department of Ecology is US Environmental Protection Agency/State Identification Number WA 7890008967. This identification number encompasses a number of waste management units within the Hanford Site. Westinghouse Hanford Company is a major contractor to the US Department of Energy-Richland Operations Office and serves as co-operator of the Low-Level Burial Grounds, the waste management unit addressed by this permit application. The Low-Level Burial Grounds Dangerous Waste Permit Application consists of both a Part A and a Part B Permit Application. The original Part A, submitted in November 1985, identified landfills, retrievable storage units, and reserved areas. An explanation of subsequent Part A revisions is provided at the beginning of the Part A section. Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology

  17. Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan

    Science.gov (United States)

    Dan Bremer

    2007-01-01

    The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...

  18. TFTR grounding scheme and ground-monitor system

    International Nuclear Information System (INIS)

    Viola, M.

    1983-01-01

    The Tokamak Fusion Test Reactor (TFTR) grounding system utilizes a single-point ground. It is located directly under the machine, at the basement floor level, and is tied to the building perimeter ground. Wired to this single-point ground, via individual 500 MCM insulated cables, are: the vacuum vessel; four toroidal field coil cases/inner support structure quadrants; umbrella structure halves; the substructure ring girder; radial beams and columns; and the diagnostic systems. Prior to the first machine operation, a ground-loop removal program was initiated. It required insulation of all hangers and supports (within a 35-foot radius of the center of the machine) of the various piping, conduits, cable trays, and ventilation systems. A special ground-monitor system was designed and installed. It actively monitors each of the individual machine grounds to insure that there are no inadvertent ground loops within the machine structure or its ground and that the machine grounds are intact prior to each pulse. The TFTR grounding system has proven to be a very manageable system and one that is easy to maintain

  19. Contractors' Support of U.S. Operations in Iraq

    National Research Council Canada - National Science Library

    Frisk, Daniel; Trunkey, R. D; Talaber, Adam; Adedeji, Adebayo; Liu, Victoria; Dennis, Robert; Gullo, Theresa; Sammartino, Frank; Murphy, Robert; Elsea, Jennifer

    2008-01-01

    .... This paper, which covers the period from 2003 through 2007, provides an overview of the federal costs of employing contractors in Iraq and in nearby countries, the type of products and services...

  20. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  1. 48 CFR 227.7207 - Contractor data repositories.

    Science.gov (United States)

    2010-10-01

    ... repositories. 227.7207 Section 227.7207 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Computer Software and Computer Software Documentation 227.7207 Contractor data repositories. Follow 227.7108 when it is in the Government's interests to have a data repository include computer software or to...

  2. The ACE-DTU Planar Near-Field Ground Penetrating Radar Antenna Test Facility

    DEFF Research Database (Denmark)

    Lenler-Eriksen, Hans-Rudolph; Meincke, Peter

    2004-01-01

    The ACE-DTU planar near-field ground penetrating radar (GPR) antenna test facility is used to measure the plane-wave transmitting spectrum of a GPR loop antenna close to the air-soil interface by means of a probe buried in soil. Probe correction is implemented using knowledge about the complex...

  3. Ground vibration test results for Drones for Aerodynamic and Structural Testing (DAST)/Aeroelastic Research Wing (ARW-1R) aircraft

    Science.gov (United States)

    Cox, T. H.; Gilyard, G. B.

    1986-01-01

    The drones for aerodynamic and structural testing (DAST) project was designed to control flutter actively at high subsonic speeds. Accurate knowledge of the structural model was critical for the successful design of the control system. A ground vibration test was conducted on the DAST vehicle to determine the structural model characteristics. This report presents and discusses the vibration and test equipment, the test setup and procedures, and the antisymmetric and symmetric mode shape results. The modal characteristics were subsequently used to update the structural model employed in the control law design process.

  4. 48 CFR 245.608-7 - Reimbursement of cost for transfer of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Reimbursement of cost for transfer of contractor inventory. 245.608-7 Section 245.608-7 Federal Acquisition Regulations System... Reporting, Redistribution, and Disposal of Contractor Inventory 245.608-7 Reimbursement of cost for transfer...

  5. Key aspects in managing safety when working with multiple contractors: A case study

    NARCIS (Netherlands)

    Drupsteen, L.; Rasmussen, H.B.; Ustailieva, E.; Kampen, J. van

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues

  6. Private Security Contractors in Iraq: Background, Legal Status, and Other Issues

    Science.gov (United States)

    2008-09-29

    reporting procedures, bad investigation methods and unfair double standards amongst employees should not be condoned." Tom Jackman , “Security Contractor...Cleared in Two Firings”, Washington Post, August 2, 2007. p. A-15. 43 Tom Jackman . “U.S. Contractor Fired on Iraqi Vehicles for Sport, Suit Alleges...Public Diplomacy and Public Affairs Karen Hughes , speaking before the Council on Foreign Relations, New York City, N.Y., on May 10, 2006, said of the new

  7. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  8. Defense Trade Contractors Engage in Varied International Alliances

    National Research Council Canada - National Science Library

    2000-01-01

    .... Generally, two or more companies form a team by negotiating an agreement to work together to pursue a particular government procurement, with one company acting as the primary contractor and others as subcontractors...

  9. Reusable LH2 tank technology demonstration through ground test

    Science.gov (United States)

    Bianca, C.; Greenberg, H. S.; Johnson, S. E.

    1995-01-01

    The paper presents the project plan to demonstrate, by March 1997, the reusability of an integrated composite LH2 tank structure, cryogenic insulation, and thermal protection system (TPS). The plan includes establishment of design requirements and a comprehensive trade study to select the most suitable Reusable Hydrogen Composite Tank system (RHCTS) within the most suitable of 4 candidate structural configurations. The 4 vehicles are winged body with the capability to deliver 25,000 lbs of payload to a circular 220 nm, 51.6 degree inclined orbit (also 40,000 lbs to a 28.5 inclined 150 nm orbit). A prototype design of the selected RHCTS is established to identify the construction, fabrication, and stress simulation and test requirements necessary in an 8 foot diameter tank structure/insulation/TPS test article. A comprehensive development test program supports the 8 foot test article development and involves the composite tank itself, cryogenic insulation, and integrated tank/insulation/TPS designs. The 8 foot diameter tank will contain the integrated cryogenic insulation and TPS designs resulting from this development and that of the concurrent lightweight durable TPS program. Tank ground testing will include 330 cycles of LH2 filling, pressurization, body loading, depressurization, draining, and entry heating.

  10. Defense Contract Audit Agency Audits of Contractor Compliance with Cost Accounting Standards

    Science.gov (United States)

    1999-01-11

    Appendix B. Continued Need for Cost Accounting Standards Asset Valuations. GAAP requires that assets be revalued after mergers and acquisitions. If the...purchase method is used to revalue assets , depreciation and amortization costs may increase drastically to be passed on as increased costs on...contractor fully for the assets through normal depreciation . Contractor Pension Plans. Government-funded pension assets must be properly allocated

  11. Out of the Shadows: The Health and Well-Being of Private Contractors Working in Conflict Environments.

    Science.gov (United States)

    Dunigan, Molly; Farmer, Carrie M; Burns, Rachel M; Hawks, Alison; Setodji, Claude Messan

    2014-01-01

    Over the past decade, private contractors have been deployed extensively around the globe. In addition to supporting U.S. and allied forces in Iraq and Afghanistan, contractors have assisted foreign governments, nongovernmental organizations, and private businesses by providing a wide range of services, including base support and maintenance, logistical support, transportation, intelligence, communications, construction, and security. At the height of the conflicts in Iraq and Afghanistan, contractors outnumbered U.S. troops deployed to both theaters. Although these contractors are not supposed to engage in offensive combat, they may nonetheless be exposed to many of the stressors that are known to have physical and mental health implications for military personnel. RAND conducted an online survey of a sample of contractors who had deployed on contract to a theater of conflict at least once between early 2011 and early 2013. The survey collected demographic and employment information, along with details about respondents' deployment experience (including level of preparation for deployment, combat exposure, and living conditions), mental health (including probable posttraumatic stress disorder, depression, and alcohol misuse), physical health, and access to and use of health care. The goal was to describe the contractors' health and well-being and to explore differences across the sample by such factors as country of citizenship, job specialty, and length and frequency of contract deployment. The findings provide a foundation for future studies of contractor populations and serve to inform policy decisions affecting contractors, including efforts to reduce barriers to mental health treatment for this population.

  12. 48 CFR 3.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ... otherwise authorized by law or regulation. Any release containing contractor bid or proposal information or..., and marking of contractor bid or proposal information and source selection information. 3.104-4... marking of contractor bid or proposal information and source selection information. (a) Except as...

  13. Vision-based Ground Test for Active Debris Removal

    Directory of Open Access Journals (Sweden)

    Seong-Min Lim

    2013-12-01

    Full Text Available Due to the continuous space development by mankind, the number of space objects including space debris in orbits around the Earth has increased, and accordingly, difficulties of space development and activities are expected in the near future. In this study, among the stages for space debris removal, the implementation of a vision-based approach technique for approaching space debris from a far-range rendezvous state to a proximity state, and the ground test performance results were described. For the vision-based object tracking, the CAM-shift algorithm with high speed and strong performance, and the Kalman filter were combined and utilized. For measuring the distance to a tracking object, a stereo camera was used. For the construction of a low-cost space environment simulation test bed, a sun simulator was used, and in the case of the platform for approaching, a two-dimensional mobile robot was used. The tracking status was examined while changing the position of the sun simulator, and the results indicated that the CAM-shift showed a tracking rate of about 87% and the relative distance could be measured down to 0.9 m. In addition, considerations for future space environment simulation tests were proposed.

  14. Dynamic load testing on the bearing capacity of prestressed tubular concrete piles in soft ground

    Science.gov (United States)

    Yu, Chuang; Liu, Songyu

    2008-11-01

    Dynamic load testing (DLT) is a high strain test method for assessing pile performance. The shaft capacity of a driven PTC (prestressed tubular concrete) pile in marine soft ground will vary with time after installation. The DLT method has been successfully transferred to the testing of prestressed pipe piles in marine soft clay of Lianyungang area in China. DLT is investigated to determine the ultimate bearing capacity of single pile at different period after pile installation. The ultimate bearing capacity of single pile was founded to increase more than 70% during the inventing 3 months, which demonstrate the time effect of rigid pile bearing capacity in marine soft ground. Furthermore, the skin friction and axial force along the pile shaft are presented as well, which present the load transfer mechanism of pipe pile in soft clay. It shows the economy and efficiency of DLT method compared to static load testing method.

  15. Financial Reporting by Selected Defense Agencies of Government Property in the Custody of Contractors

    National Research Council Canada - National Science Library

    1997-01-01

    ... over the $92 billion of Government property in the custody of contractors. After several years of planning, DoD has not developed a standard accounting system for recording, tracking, and reporting Government property in the custody of contractors...

  16. 48 CFR 22.1503 - Procedures for acquiring end products on the List of Products Requiring Contractor Certification...

    Science.gov (United States)

    2010-10-01

    ... end products on the List of Products Requiring Contractor Certification as to Forced or Indentured... products on the List of Products Requiring Contractor Certification as to Forced or Indentured Child Labor... contracting officer must check the List of Products Requiring Contractor Certification as to Forced or...

  17. Integrated Human-in-the-Loop Ground Testing - Value, History, and the Future

    Science.gov (United States)

    Henninger, Donald L.

    2016-01-01

    Systems for very long-duration human missions to Mars will be designed to operate reliably for many years and many of these systems will never be returned to Earth. The need for high reliability is driven by the requirement for safe functioning of remote, long-duration crewed systems and also by unsympathetic abort scenarios. Abort from a Mars mission could be as long as 450 days to return to Earth. The key to developing a human-in-the-loop architecture is a development process that allows for a logical sequence of validating successful development in a stepwise manner, with assessment of key performance parameters (KPPs) at each step; especially important are KPPs for technologies evaluated in a full systems context with human crews on Earth and on space platforms such as the ISS. This presentation will explore the implications of such an approach to technology development and validation including the roles of ground and space-based testing necessary to develop a highly reliable system for long duration human exploration missions. Historical development and systems testing from Mercury to the International Space Station (ISS) to ground testing will be reviewed. Current work as well as recommendations for future work will be described.

  18. 78 FR 64143 - 30-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-88] 30-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Chief Information... Title of Information Collection: Contractor's Requisition--Project Mortgages. OMB Approval Number: 2502...

  19. 2005 River Corridor Cleanup Contractor Revegetation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    A. L. Johnson

    2005-09-12

    This report contains a compilation of the results of vegetation monitoring data that were collected in the spring and summer of 2005 for the Environmental Restoration Contractor's revegetation and mitigation areas on the Hanford Site.

  20. DOE contractor trade network: a decade of experience in training resource exchange

    International Nuclear Information System (INIS)

    Croll, P.; Weseman, M.

    1989-01-01

    Training Resources and Data Exchange (TRADE) refers to a series of activities designed to increase communication and exchanges of ideas, information, and resources among US Department of Energy contractor operated facilities in the field of training and human resource development. TRADE activities are planned and implemented by the DOE Contractor TRADE Executive Committee. TRADE objectives are accomplished through conference workshops, publications, and special interest groups. TRADE special interest groups include the following: computer-based training, emergency preparedness, industrial hygiene training, human resource issues, radiation protection training, safeguards and security training. The authors discuss how TRADE has evolved to meet changing contractor needs to improve human performance over the last 10 years. TRADE currently has working agreements to share training information with INPO, the Federal Laboratories Consortium, and the National Registry of Radiation Protection Technologists

  1. Army Depot Maintenance: More Effective Use of Organic and Contractor Resources

    Science.gov (United States)

    1990-06-04

    terkerrny (PA) RRAD Red River (TX) IBAD Lexingtor).Bluegrass (KY) 3MPUAD Pueblo (CO) 2000 ANAD CCAD TEAD TOAD SAAO LEAD FMD LBAD PUAfl j] Aut)’onzed Onboard...until it is received by the contractor. That problem could be eliminated by redesigning the process. Specifically, the FTA document that notifies the...should revise CCSS to allow the FTM document to generate an image to LCA, the FTA to create a due-in to the contractor, and CCSS to determine the depot

  2. 75 FR 6669 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2010-02-10

    ...' Purchasing Systems Reviews AGENCIES: Department of Defense (DOD), General Services Administration (GSA), and... collection requirement concerning contractors' purchasing systems reviews. A request for public comments was..., Washington, DC 20405. Please cite OMB Control No. 9000-0132, Contractors' Purchasing Systems Review, in all...

  3. 78 FR 45945 - 60-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-07-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-34] 60-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Assistant Secretary... Section A. A. Overview of Information Collection Title of Information Collection: Contractor's Requisition...

  4. Evaluation of two transport aircraft and several ground test vehicle friction measurements obtained for various runway surface types and conditions. A summary of test results from joint FAA/NASA Runway Friction Program

    Science.gov (United States)

    Yager, Thomas J.; Vogler, William A.; Baldasare, Paul

    1990-01-01

    Tests with specially instrumented NASA Boeing 737 and 727 aircraft together with several different ground friction measuring devices were conducted for a variety of runway surface types and conditions. These tests are part of joint FAA/NASA Aircraft/Ground Vehicle Runway Friction Program aimed at obtaining a better understanding of aircraft ground handling performance under adverse weather conditions and defining relationships between aircraft and ground vehicle tire friction measurements. Aircraft braking performance on dry, wet, snow and ice-covered runway conditions is discussed as well as ground vehicle friction data obtained under similar runway conditions. For a given contaminated runway surface condition, the correlation between ground vehicles and aircraft friction data is identified. The influence of major test parameters on friction measurements such as speed, test tire characteristics, type and amount of surface contaminant, and ambient temperature are discussed. The effect of surface type on wet friction levels is also evaluated from comparative data collected on grooved and ungrooved concrete and asphalt surfaces.

  5. Institutional and resource constraints that inhibit contractor ...

    African Journals Online (AJOL)

    Results show that contractors face institutional constraints (work allocation limitations, lack of performance incentives and high transaction costs, such as negotiation costs, the risk of a loss in work and contract default risk), cash flow problems, poor physical infrastructure and a lack of labour. It is expected that the promotion ...

  6. Private Military Contractors, War Crimes and International ...

    African Journals Online (AJOL)

    The end of the Cold War witnessed the growth and spread of legally established private military contractors (PMCs) playing largely undefined roles in wars, international security and post-conflict reconstruction. The operations of PMCs in Iraq and Afghanistan in the 21st century have been marked by gross human rights ...

  7. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    National Research Council Canada - National Science Library

    Arnold, Scot A; Harmon, Bruce R; Tyson, Karen W; Fasana, Kenton G; Wait, Christopher S

    2009-01-01

    .... The goal of profit policy is a contract price that reimburses the contractor for its costs, provides the necessary incentives to yield beneficial performance, and provides the contractor with sufficient risk reward...

  8. AMS Ground Truth Measurements: Calibration and Test Lines

    International Nuclear Information System (INIS)

    Wasiolek, P.

    2013-01-01

    Airborne gamma spectrometry is one of the primary techniques used to define the extent of ground contamination after a radiological incident. Its usefulness was demonstrated extensively during the response to the Fukushima nuclear power plant (NPP) accident in March-May 2011. To map ground contamination a set of scintillation detectors is mounted on an airborne platform (airplane or helicopter) and flown over contaminated areas. The acquisition system collects spectral information together with the aircraft position and altitude every second. To provide useful information to decision makers, the count rate data expressed in counts per second (cps) needs to be converted to the terrestrial component of the exposure rate 1 m above ground, or surface activity of isotopes of concern. This is done using conversion coefficients derived from calibration flights. During a large scale radiological event, multiple flights may be necessary and may require use of assets from different agencies. However, as the production of a single, consistent map product depicting the ground contamination is the primary goal, it is critical to establish very early into the event a common calibration line. Such a line should be flown periodically in order to normalize data collected from different aerial acquisition systems and potentially flown at different flight altitudes and speeds. In order to verify and validate individual aerial systems, the calibration line needs to be characterized in terms of ground truth measurements. This is especially important if the contamination is due to short-lived radionuclides. The process of establishing such a line, as well as necessary ground truth measurements, is described in this document.

  9. AMS Ground Truth Measurements: Calibrations and Test Lines

    Energy Technology Data Exchange (ETDEWEB)

    Wasiolek, Piotr T. [National Security Technologies, LLC

    2015-12-01

    Airborne gamma spectrometry is one of the primary techniques used to define the extent of ground contamination after a radiological incident. Its usefulness was demonstrated extensively during the response to the Fukushima NPP accident in March-May 2011. To map ground contamination, a set of scintillation detectors is mounted on an airborne platform (airplane or helicopter) and flown over contaminated areas. The acquisition system collects spectral information together with the aircraft position and altitude every second. To provide useful information to decision makers, the count data, expressed in counts per second (cps), need to be converted to a terrestrial component of the exposure rate at 1 meter (m) above ground, or surface activity of the isotopes of concern. This is done using conversion coefficients derived from calibration flights. During a large-scale radiological event, multiple flights may be necessary and may require use of assets from different agencies. However, because production of a single, consistent map product depicting the ground contamination is the primary goal, it is critical to establish a common calibration line very early into the event. Such a line should be flown periodically in order to normalize data collected from different aerial acquisition systems and that are potentially flown at different flight altitudes and speeds. In order to verify and validate individual aerial systems, the calibration line needs to be characterized in terms of ground truth measurements This is especially important if the contamination is due to short-lived radionuclides. The process of establishing such a line, as well as necessary ground truth measurements, is described in this document.

  10. WORKER PROTECTION: Federal Contractors and Violations of Labor Law

    National Research Council Canada - National Science Library

    1995-01-01

    ... of Federal Contract Compliance Programs (OFCCP). Federal law and an executive order place greater responsibilities on federal contractors compared with other employers In some areas of workplace activity...

  11. When Contractors Deploy: A Guide for the Operational Commander

    National Research Council Canada - National Science Library

    Buhler, Carl

    2000-01-01

    .... Furthermore, this paper also lists four recommendations for operational commanders and the military on how to better integrate contractors into the military effort, especially during hostile combat situations...

  12. APPROVAL OF WASTE TREATMENT AND IMMOBILIZATION PLANT CONTRACTOR-INITIATED AUTHORIZATION BASIS AMENDMENT REQUESTS (ABAR)

    International Nuclear Information System (INIS)

    JONES GL

    2008-01-01

    The objective is to describe the process used by the Office of River Protection (ORP) for evaluating and implementing Contractor-initiated changes to the Waste Treatment and Immobilization Plant (WTP) Authorization Basis (AB). The WTP Project's history has provided a unique challenge for establishing and maintaining an ORP-approved AB during design and construction. Until operations begin, the project cannot implement the classic Unreviewed Safety Question (USQ) process to determine when ORP approval of Contractor-initiated changes is required. A 'quasiUSQ' process has been implemented that defines when AB changes could occur. The three types of AB changes are (1) Limited Scope Changes, (2) Authorization Basis Deviations, and (3) Authorization Basis Amendment Request (ABAR). DOE RL/REG 97-13, 'Office of River Protection Position on Contractor-Initiated Changes to the Authorization Basis', describes the process the WTP Contractor must follow to make changes to the AB, with and without ORP approval. The process uses a 'safety evaluation' process that is similar to the USQ process but at a more qualitative level. The maturation of the WTP Contractor's facility design and activities, and other changing conditions, resulted in a process that allows the Contractor to make changes to the AB without ORP approval; however, those changes that may significantly affect nuclear safety do require ORP approval. This process balances the WTP regulatory principle of efficiency with assurance that adequate safety will not be compromised. The process has reduced the number of ABARs requiring ORP approval and reduced the potential for delays in design and procurement activities

  13. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    National Research Council Canada - National Science Library

    Arnold, Scot A; Harmon, Bruce R; Tyson, Karen W; Fasana, Kenton G; Wait, Christopher S

    2008-01-01

    .... The goal of profit policy is a contract price that reimburses the contractor for its costs, provides the necessary incentives to yield beneficial performance, and to provide the contractor with sufficient risk reward...

  14. In-flight and ground testing of single event upset sensitivity in static RAMs

    International Nuclear Information System (INIS)

    Johansson, K.; Dyreklev, P.; Granbom, B.; Calvet, C.; Fourtine, S.; Feuillatre, O.

    1998-01-01

    This paper presents the results from in-flight measurements of single event upsets (SEU) in static random access memories (SRAM) caused by the atmospheric radiation environment at aircraft altitudes. The memory devices were carried on commercial airlines at high altitude and mainly high latitudes. The SEUs were monitored by a Component Upset Test Equipment (CUTE), designed for this experiment. The in flight results are compared to ground based testing with neutrons from three different sources

  15. BUSINESS STRATEGY OF LARGE CONTRACTORS IN ADOPTING INDUSTRIALISED BUILDING SYSTEM (IBS: THE MALAYSIAN CASE

    Directory of Open Access Journals (Sweden)

    FRANKY AMBON

    2012-12-01

    Full Text Available Industrialised Building System (IBS is the term coined by the government and industry in Malaysia to represent the construction industry and the application of prefabrication method in building construction. The purpose of this exploratory research paper is to highlight business strategy being pursued by large Malaysian contractors in adopting IBS. The paper uses case study as research method. The analysis is based primarily on cross-case analysis and pattern matching technique. The paper observes contractors which involved in IBS are part of larger holding companies in a corporate set-up include design and manufacturing subsidiaries. The companies positioned themselves as one-stop total solution provider for IBS and offer a wider range of services from design, production, and installation to clients. To become competitive and able to create total solution, contractors need to establish cluster and consortium of integrated project team by creating a partnership when and where it is needed. A vendor development programme modelled along the lines of the development of automotive industry should also be established. Future empirical studies should extensively examine these areas, especially the development of business model for contractors. The availability of this model could help to accelerate the uptake of IBS among contractors.

  16. Report: Management Alert - EPA Has Not Initiated Required Background Investigations for Information Systems Contractor Personnel

    Science.gov (United States)

    Report #17-P-0409, September 27, 2017. Not vetting contractor personnel before granting them network access exposes the EPA to risks. Contractor personnel with potentially questionable backgrounds who access sensitive agency data could cause harm.

  17. Development and Testing of Techniques for In-Ground Stabilization, Size Reduction and Safe Removal of Radioactive Wastes Stored in Large Containments in Burial Grounds - 13591

    International Nuclear Information System (INIS)

    Halliwell, Stephen

    2013-01-01

    Radioactive waste materials, including Transuranic (TRU) wastes from laboratories have been stored below ground in large containments at a number of sites in the US DOE Complex, and at nuclear sites in Europe. These containments are generally referred to as caissons or shafts. The containments are in a range of sizes and depths below grade. The caissons at the DOE's Hanford site are cylindrical, of the order of 2,500 mm in diameter, 3,050 mm in height and are buried about 6,000 mm below grade. One type of caisson is made out of corrugated pipe, whereas others are made of concrete with standard re-bar. However, the larger shafts in the UK are of the order of 4,600 mm in diameter, 53,500 mm deep, and 12,000 below grade. This paper describes the R and D work and testing activities performed to date to evaluate the concept of in-ground size reduction and stabilization of the contents of large containments similar to those at Hanford. In practice, the height of the Test Facility provided for a test cell that was approximately 22' deep. That prevented a 'full scale mockup' test in the sense that the Hanford Caisson configuration would be an identical replication. Therefore, the project was conducted in two phases. The first phase tested a simulated Caisson with surrogate contents, and part of a Chute section, and the second phase tested a full chute section. These tests were performed at VJ Technologies Test Facility located in East Haven, CT, as part of the Proof of Design Concept program for studying the feasibility of an in-situ grout/grind/mix/stabilize technology for the remediation of four caissons at the 618-11 Burial Ground at US Department of Energy Hanford Site. The test site was constructed such that multiple testing areas were provided for the evaluation of various tools, equipment and procedures under conditions that simulated the Hanford site, with representative soils and layout dimensions. (authors)

  18. Development and Testing of Techniques for In-Ground Stabilization, Size Reduction and Safe Removal of Radioactive Wastes Stored in Large Containments in Burial Grounds - 13591

    Energy Technology Data Exchange (ETDEWEB)

    Halliwell, Stephen [VJ Technologies Inc, 89 Carlough Road, Bohemia, NY (United States)

    2013-07-01

    Radioactive waste materials, including Transuranic (TRU) wastes from laboratories have been stored below ground in large containments at a number of sites in the US DOE Complex, and at nuclear sites in Europe. These containments are generally referred to as caissons or shafts. The containments are in a range of sizes and depths below grade. The caissons at the DOE's Hanford site are cylindrical, of the order of 2,500 mm in diameter, 3,050 mm in height and are buried about 6,000 mm below grade. One type of caisson is made out of corrugated pipe, whereas others are made of concrete with standard re-bar. However, the larger shafts in the UK are of the order of 4,600 mm in diameter, 53,500 mm deep, and 12,000 below grade. This paper describes the R and D work and testing activities performed to date to evaluate the concept of in-ground size reduction and stabilization of the contents of large containments similar to those at Hanford. In practice, the height of the Test Facility provided for a test cell that was approximately 22' deep. That prevented a 'full scale mockup' test in the sense that the Hanford Caisson configuration would be an identical replication. Therefore, the project was conducted in two phases. The first phase tested a simulated Caisson with surrogate contents, and part of a Chute section, and the second phase tested a full chute section. These tests were performed at VJ Technologies Test Facility located in East Haven, CT, as part of the Proof of Design Concept program for studying the feasibility of an in-situ grout/grind/mix/stabilize technology for the remediation of four caissons at the 618-11 Burial Ground at US Department of Energy Hanford Site. The test site was constructed such that multiple testing areas were provided for the evaluation of various tools, equipment and procedures under conditions that simulated the Hanford site, with representative soils and layout dimensions. (authors)

  19. Report of the investigation of the accident at the MIDAS MYTH/MILAGRO Trailer Park on Rainier Mesa at Nevada Test Site on February 15, 1984

    International Nuclear Information System (INIS)

    1984-01-01

    Fourteen persons were injured, one fatally, when the ground upon which they were working collapsed, forming a subsidence crater in the recording trailer park of the MIDAS MYTH/MILAGRO nuclear weapons effects test on Rainier Mesa at the US Department of Energy's Nevada Test Site on February 15, 1984. Those persons injured were contractor and laboratory employees from Reynolds Electrical and Engineering Co., Inc. (REECo), Pan American World Services, Inc. (PANAM), and the Los Alamos National Laboratory (LANL). This report presents the results of an investigation into the causes, effects, and response to the accident. 42 figures

  20. Settlement mechanism of the backfilled ground around nuclear power plant buildings. Part 1. A series of 1G shaking table tests

    International Nuclear Information System (INIS)

    Ishimaru, Makoto; Kawai, Tadashi

    2008-01-01

    The large ground settlement locally occurred at the backfilled ground around the Kashiwazaki-Kariwa Nuclear Power Plant buildings during the Niigataken Chuetsu-oki Earthquake in 2007. The purposes of this study are to verify the assumed mechanism of the settlement and to discuss the influence factors on the settlement. For these purposes, we conducted a series of 1G shaking table tests using a rigid structure and sand. In the tests, parameters, which were variously changed, are related to two factors; one is the horizontal ground displacement relative to the structure, the other is the ground strength against the sliding failure. The following results were obtained: (1) All the results showed that the ground settlement sizes near the structure were larger than the ground settlement sizes far from the structure, (2) From the video observed at the ground near the structure, it was found that the settlement locally occurred due to the sliding failure after the ground was separated from the structure, (3) The ground settlement sizes near the structure were large as the horizontal ground displacement sizes were large, and the soil strength arising from fines affected the ground settlement sizes near the structure. (author)

  1. Complex biological testing of ground water quality in the area of sewage settler filtration fields of JSC 'Almaty Kanty'

    International Nuclear Information System (INIS)

    Vetrinskaya, N.I.; Goldobina, E.A.; Kosmukhambetov, A.R.; Kulikova, O.V.; Kozlova, N.V.; Ismailova, Zh.B.

    2001-01-01

    Results are given on the ground water ecological quality estimation of operating survey boreholes of JSC 'Almaty Kanty' industrial enterprise filtration fields using different methods of biological testing. Proved that various biological objects reacted differently onto the toxins present in the water. Concealment of toxic effect was performed at short-period testing at several testing objects (stimulation). Revealed during long period tests, that ground water from all the boreholes surveyed is not ecologically clean and pure, and can bring damage for ecosystem of water reservoirs adjacent and sources of drinking water if migration happens. (author)

  2. 2006 Fundamental Research Underlying Solid-State Lighting: Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kini, Arvind [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kelley, Dick [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-02-01

    This volume highlights the scientific content of the 2006 Fundamental Research Underlying Solid-State Lighting Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) in the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). This meeting is the second in a series of research theme-based Contractors Meetings and will focus on BES/DMS&E-funded research that underpins solid-state lighting technology. The meeting will feature research that cuts across several DMS&E core research program areas. The major programmatic emphasis is on developing a fundamental scientific base, in terms of new concepts and new materials that could be used or mimicked in designing novel materials, processes or devices.

  3. DOE contractor radiation safety CBT [computer based training] course

    International Nuclear Information System (INIS)

    Gardner, P.R.

    1986-01-01

    Westinghouse Hanford Company developed a generic Radiation Worker safety CBT course for Department of Energy contractors. Task analysis concentrated on actual and potential tasks and included visits to fourteen different contractor sites. Team Design and Prototype verification formed the major portion of the development phase. Lesson entry was accomplished using the WISE author system from WICAT Systems, Inc. The course features graded task simulations for both Pretest and Final; fourteen Topics in five Lessons, each Topic keyed to ''Critical Acts'' and Questions in the Pretest and Final; Automatic, Intensive, and Manual modes of instruction available for each Lesson; Practical Problems and Sample Questions associated with each Topic; and provisions for local configuration in several areas. The course is deliverable on IBM PC compatible equipment. 2 refs

  4. Hypersonic Inflatable Aerodynamic Decelerator Ground Test Development

    Science.gov (United States)

    Del Corso, Jospeh A.; Hughes, Stephen; Cheatwood, Neil; Johnson, Keith; Calomino, Anthony

    2015-01-01

    Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology readiness levels have been incrementally matured by NASA over the last thirteen years, with most recent support from NASA's Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP). Recently STMD GCDP has authorized funding and support through fiscal year 2015 (FY15) for continued HIAD ground developments which support a Mars Entry, Descent, and Landing (EDL) study. The Mars study will assess the viability of various EDL architectures to enable a Mars human architecture pathfinder mission planned for mid-2020. At its conclusion in November 2014, NASA's first HIAD ground development effort had demonstrated success with fabricating a 50 W/cm2 modular thermal protection system, a 400 C capable inflatable structure, a 10-meter scale aeroshell manufacturing capability, together with calibrated thermal and structural models. Despite the unquestionable success of the first HIAD ground development effort, it was recognized that additional investment was needed in order to realize the full potential of the HIAD technology capability to enable future flight opportunities. The second HIAD ground development effort will focus on extending performance capability in key technology areas that include thermal protection system, lifting-body structures, inflation systems, flight control, stage transitions, and 15-meter aeroshell scalability. This paper presents an overview of the accomplishments under the baseline HIAD development effort and current plans for a follow-on development effort focused on extending those critical technologies needed to enable a Mars Pathfinder mission.

  5. Contractor selection: a quantitative, consensus-friendly, transparent ...

    African Journals Online (AJOL)

    This article offers a method for selecting contractors in an objective, transparent and participative way. The use of the Decision Analysis System (DAS), also referred to as decision-making by objectives, makes it possible that a large number of objectives can be taken into account to select the best amongst a wide range of ...

  6. Security of payment regime in construction industry: are Malaysian sub-contractors ready?

    OpenAIRE

    Supardi, Azizan; Adnan, Hamimah; Mohammad, Mohammad Fadhil

    2011-01-01

    In Malaysia, the particularly small sized sub-contractors are definitely benefited from payment provisions in the proposed Construction Industry Payment and Adjudication Act (CIPA Act), but need to enhance their knowledge in order to improve their awareness of the benefits of the Act. Accordingly, this on-going research attempts to introduce proper guidelines to the sub-contractors, in giving the knowledge, to claim for payment. Firstly, the research explored the problems and legal issues rel...

  7. Evaluation Criteria to Deliverables Crosswalk for the Tank Farm Contractor (Supercedes HNF-2020)

    International Nuclear Information System (INIS)

    WOJTASEK, R.D.

    2000-01-01

    Before the Office of River Protection can authorize proceeding with Phase 1B, the Tank Farm Contractor (TFC) must demonstrate readiness to retrieve and deliver the waste to the privatization contractor and to receive and dispose of the products and by-products returned from treatment. The TFC has organized their plans for providing these support services into the within the River Protection Project

  8. Defense Organization Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance

    Science.gov (United States)

    2017-02-01

    must evaluate compliance with reporting requirements frequently so they can readily identify delinquent past performance reports.24 The FAR also...problems the contractor recovered from without impact to the contract/ order. There should have been no significant weaknesses identified. A...contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool

  9. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  10. Strategic Change in a Construction Contractor's Purchasing Organisation and Supplier Relations

    DEFF Research Database (Denmark)

    Koch, Christian; Tambo, Torben

    2010-01-01

    The paper adopts a combined supply chain management and purchasing theory approach to changes in a contractor's purchasing organization and suppliers relations. This is seen to be a complex prolonged change process emerging over long time. The method is qualitative and longitudinal combining ex...... ante studies with ex post elements. As the time frame is ten years a necessary combination of studies with different aims has been done. The case of a major contractor's efforts within supply chain and purchasing exhibits a number of change elements in interaction; new business concepts, processes...

  11. The status of contractors workers operating in US nuclear power plants

    International Nuclear Information System (INIS)

    Lochard, J.

    1985-01-01

    The status of contractors operating in PWRs in the United States is described. The statistics concerning the trends of both the individual and collective exposures of these workers were analysed as well as their main demographic and sociological features. The data relative to the particular group of ''transient'' workers, i.e. those operating in several different power plants during the same year were also examined. The results presented show that the dosimetric and sociological profiles of contractors' workers, in US power plants, do not differ fundamentally from that of permanent workers [fr

  12. Highway vehicle systems contractors coordination meeting. Seventeenth summary report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    Separate abstracts was prepared for each of the 62 papers presented at the Contractors' Coordination meeting on highway vehicle systems. One paper had previously appeared in DOE's data base.

  13. Simulation analyses of vibration tests on pile-group effects using blast-induced ground motions

    International Nuclear Information System (INIS)

    Takayuki Hashimoto; Kazushige Fujiwara; Katsuichirou Hijikata; Hideo Tanaka; Kohji Koyamada; Atsushi Suzuki; Osamu Kontani

    2005-01-01

    Extensive vibration tests have been performed on pile-supported structures at a large-scale mining site to promote better understanding of the dynamic behavior of pile-supported structures, especially pile-group effects. Two test structures were constructed in an excavated pit. One structure was supported on 25 tubular steel piles and the other on 4. The test pit was backfilled with sand of an appropriate grain size distribution to ensure good compaction. Ground motions induced by large-scale blasting operations were used as excitation forces for the tests. The 3D Finite Element Method (3D FEM)and a Genetic Algorithm (GA) were employed to identify the shear wave velocities and damping factors of the compacted sand, especially of the surface layer. A beam-interaction spring model was employed to simulate the test results of the piles and the pile-supported structures. The superstructure and pile foundation were modeled by a one-stick model comprising lumped masses and beam elements. The pile foundations were modeled just as they were, with lumped masses and beam elements to simulate the test results showing that, for the 25-pile structure, piles at different locations showed different responses. It was confirmed that the analysis methods employed were very useful for evaluating the nonlinear behavior of the soil-pile-structure system, even under severe ground motions. (authors)

  14. Risk-based screening analysis of ground water contaminated by radionuclides introduced at the Nevada Test Site (NTS)

    International Nuclear Information System (INIS)

    Daniels, J.I.; Anspaugh, L.R.; Andricevic, R.; Jacobson, R.L.

    1993-06-01

    The Nevada Test Site (NTS) is located in the southwestern part of Nevada, about 105 km (65 mi) northwest of the city of Las Vegas. Underground tests of nuclear weapons devices have been conducted at the NTS since late 1962 and ground water beneath the NTS has been contaminated with radionuclides produced by these tests. This concern prompted this examination of the potential health risk to these individuals from drinking the contaminated ground water either at a location on the NTS (assuming loss of institutional control after 100 y) or at one offsite (considering groundwater migration). For the purpose of this assessment, a representative mix of the radionuclides of importance and their concentrations in ground water beneath the NTS were identified from measurements of radionuclide concentrations in groundwater samples-of-opportunity collected at the NTS. Transport of radionuclide-contaminated ground water offsite was evaluated using a travel-time-transport approach. At both locations of interest, potential human-health risk was calculated for an individual ingesting radionuclide-contaminated ground water over the course of a 70-y lifetime. Uncertainties about human physiological attributes, as well as about estimates of physical detriment per unit of radioactive material, were quantified and incorporated into the estimates of risk. The maximum potential excess lifetime risk of cancer mortality estimated for an individual at the offsite location ranges from 7 x 10 -7 to 1 x 10 -5 , and at the onsite location ranges from 3 x 10 -3 to 2 x 10 -2 . Both the offsite and the onsite estimates of risk are dominated by the lifetime doses from tritium. For the assessment of radionuclides in ground water, the critical uncertainty is their concentration today under the entire NTS

  15. 76 FR 27648 - Submission for OMB Review; Preventing Personal Conflicts of Interest for Contractor Employees...

    Science.gov (United States)

    2011-05-12

    ...; Preventing Personal Conflicts of Interest for Contractor Employees Performing Acquisition Functions AGENCY... approve a new information collection requirement regarding Preventing Personal Conflicts of Interest for... Conflicts of Interest for Contractor Employees Performing Acquisition Functions by any of the following...

  16. Commissioning of the Ground Test Accelerator Intertank Matching Section

    International Nuclear Information System (INIS)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Cole, R.; Connolly, R.; Gilpatrick, J.D.; Ingalls, W.B.; Kersteins, D.; Little, C.; Lohsen, R.A.; Lysenko, W.P.; Mottershead, C.T.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 keV H - injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2βγ Drift Tube Linac (DTL-1) module, the 8.7 MeV 2βγ DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the IMS beam experiments will be presented

  17. DOE Human Genome Program contractor-grantee workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This volume contains the proceedings for the DOE Human Genome Program`s Contractor-Grantee Workshop V held in Sante Fe, New Mexico January 28, February 1, 1996. Presentations were divided into sessions entitled Sequencing; Mapping; Informatics; Ethical, Legal, and Social Issues; and Infrastructure. Reports of individual projects described herein are separately indexed and abstracted for the database.

  18. 78 FR 17673 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2013-03-22

    ... collection would violate the fundamental purposes of the Paperwork Reduction Act because of the burden it... subcontracting. We submit that fundamental preparation for a review is part of a contractor's normal course of... accounting of the contractors' time expenditure needed to prepare for a CPSR and respond to any contracting...

  19. 48 CFR 45.402 - Title to contractor-acquired property.

    Science.gov (United States)

    2010-10-01

    ... the contract. Under fixed-price type contracts, in the absence of financing provisions or other... item. If a deliverable item is to be retained by the contractor for use after inspection and acceptance...

  20. ERC hazard classification matrices for above ground structures and groundwater and soil remediation activities

    International Nuclear Information System (INIS)

    Curry, L.R.

    1997-01-01

    This document provides the status of the preliminary hazard classification (PHC) process for the Environmental Restoration Contractor (ERC) above ground structures and groundwater and soil remediation activities currently underway for planned for fiscal year (FY) 1997. This classification process is based on current US Department of Energy (DOE), Richland Operations Office (RL) guidance for the classification of facilities and activities containing radionuclide and nonradiological hazardous material inventories. The above ground structures presented in the matrices were drawn from the Bechtel Hanford, Inc. (BHI) Decontamination and Decommissioning (D and D) Project Facility List (DOE 1996), which identifies the facilities in the RL-Environmental Restoration baseline contract in 1997. This document contains the following two appendices: (1) Appendix A, which consists of a matrix identifying PHC documents that have been issued for BHI's above ground structures and groundwater and soil remediation activities underway or planned for FY 1997, and (2) Appendix B, which consists of a matrix showing anticipated PHCs for above ground structures, and groundwater and soil remediation activities underway or planned for FY 1997. Appendix B also shows the schedule for finalization of PHCs for above ground structures with an anticipated classification of Nuclear

  1. Hyper-X Mach 7 Scramjet Design, Ground Test and Flight Results

    Science.gov (United States)

    Ferlemann, Shelly M.; McClinton, Charles R.; Rock, Ken E.; Voland, Randy T.

    2005-01-01

    The successful Mach 7 flight test of the Hyper-X (X-43) research vehicle has provided the major, essential demonstration of the capability of the airframe integrated scramjet engine. This flight was a crucial first step toward realizing the potential for airbreathing hypersonic propulsion for application to space launch vehicles. However, it is not sufficient to have just achieved a successful flight. The more useful knowledge gained from the flight is how well the prediction methods matched the actual test results in order to have confidence that these methods can be applied to the design of other scramjet engines and powered vehicles. The propulsion predictions for the Mach 7 flight test were calculated using the computer code, SRGULL, with input from computational fluid dynamics (CFD) and wind tunnel tests. This paper will discuss the evolution of the Mach 7 Hyper-X engine, ground wind tunnel experiments, propulsion prediction methodology, flight results and validation of design methods.

  2. Needs of Non Energy-Focused Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Liaukus, C.

    2012-12-01

    To better understand the informational needs of non energy-focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  3. Needs of Non-Energy Focused Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Liakus, C. [Building Media and the Building America Retrofit Alliance (BARA), Wilmington, DE (United States)

    2012-12-01

    To better understand the informational needs of non-energy focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  4. Contractors on the Battlefield Force Multipliers or Force Dividers?

    National Research Council Canada - National Science Library

    Nelson, Kim

    2000-01-01

    .... An increased reliance on contractor support has helped ease the burden on a heavily reduced force structure, but has left military commanders vulnerable to declaring a non-mission capable status during times of crisis...

  5. Operator/contractor teamwork is the key to performance improvement

    International Nuclear Information System (INIS)

    Robins, K.B.; Roberts, J.D.M.

    1996-01-01

    The contract strategies developed by the two major E and P companies operating in the North Sea emphasize teamwork between operator and contractors to achieve the common goal of maximizing project value. These strategies have had significant repercussions across the whole industry. This paper compares these strategies and concludes that although they are structurally different, they have the same fundamental objectives. It describes the evolution of what these operators consider to be their core business, with the resultant changing roles for both operator and contractor staff. Several examples of results achieved through implementing these changes are described, highlighting the need for a structured performance measurement system to quantify the success of these initiatives. Finally, the potential for even greater efficiency improvements through further industry-wide cooperation is emphasized

  6. 75 FR 78755 - Notice of Initial Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2010-12-16

    ... Products Requiring Federal Contractor Certification as to Forced/Indentured Child Labor Pursuant to... products requiring federal contractor certification as to the use of forced or indentured child labor. To.... 13126 (``Prohibition of Acquisition of Products Produced by Forced or Indentured Child Labor''), in...

  7. 77 FR 59418 - Notice of Initial Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2012-09-27

    ... of products requiring federal contractor certification as to the use of forced or indentured child... DEPARTMENT OF LABOR Notice of Initial Determination Revising the List of Products Requiring Federal Contractor Certification as to Forced/Indentured Child Labor Pursuant to Executive Order 13126...

  8. 76 FR 61384 - Notice of Initial Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2011-10-04

    ... Maintenance of the List of Products Requiring Federal Contractor Certification as to Forced or Indentured... DEPARTMENT OF LABOR Notice of Initial Determination Revising the List of Products Requiring Federal Contractor Certification as to Forced/Indentured Child Labor Pursuant to Executive Order 13126...

  9. Summary of hydrogeologic controls on ground-water flow at the Nevada Test Site, Nye County, Nevada

    Science.gov (United States)

    Laczniak, R.J.; Cole, J.C.; Sawyer, D.A.; Trudeau, D.A.

    1996-01-01

    The underground testing of nuclear devices has generated substantial volumes of radioactive and other chemical contaminants below ground at the Nevada Test Site (NTS). Many of the more radioactive contaminants are highly toxic and are known to persist in the environment for thousands of years. In response to concerns about potential health hazards, the U.S. Department of Energy, under its Environmental Restoration Program, has made NTS the subject of a long-term investigation. Efforts supported through the U.S. Department of Energy program will assess whether byproducts of underground testing pose a potential hazard to the health and safety of the public and, if necessary, will evaluate and implement steps to remediate any of the identified dangers. Test-generated contaminants have been introduced over large areas and at variable depths above and below the water table throughout NTS. Evaluating the risks associated with these byproducts of underground testing presupposes a knowledge of the source, transport, and potential receptors of these contaminants. Ground-water flow is the primary mechanism by which contaminants can be transported significant distances away from the initial point of injection. Flow paths between contaminant sources and potential receptors are separated by remote areas that span tens of miles. The diversity and structural complexity of the rocks along these flow paths complicates the hydrology of the region. Although the hydrology has been studied in some detail, much still remains uncertain about flow rates and directions through the fractured-rock aquifers that transmit water great distances across this arid region. Unique to the hydrology of NTS are the effects of underground testing, which severely alter local rock characteristics and affect hydrologic conditions throughout the region. Any assessment of the risk must rely in part on the current understanding of ground-water flow, and the assessment will be only as good as the understanding

  10. 40 CFR 35.938-6 - Progress payments to contractors.

    Science.gov (United States)

    2010-07-01

    ... on nor diverted to another job; and (iii) A fabrication period of more than 6 months is anticipated...: (i) A first payment upon submission by the prime contractor of shop drawings for the equipment or...

  11. 75 FR 69037 - Medicaid Program; Recovery Audit Contractors

    Science.gov (United States)

    2010-11-10

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services 42 CFR Part 455 [CMS-6034-P] RIN 0938-AQ19 Medicaid Program; Recovery Audit Contractors AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Proposed rule. SUMMARY: This proposed rule would provide guidance to...

  12. Comparative Study On The Ethical Perceptions Of Contractors And Designers In The China Construction Industry

    Science.gov (United States)

    Kang, Byung Gyoo; Long, Kaiwen; Zhang, Cheng; Li Hao, Jian

    2017-12-01

    Ethics is becoming one of the most important requirements for successful business in the 21st century. The construction industry cannot be exceptional from this trend. However construction ethics management requires different approaches from other industries, as the products of the industry are construction projects which are completely different from mass production. Contractors and designers are two major participants in construction projects. The roles and responsibilities of these two project stakeholders decisively influence all aspects of construction project. Practically ethical perceptions of contractors and designers are one of main aspects to be considered for the effective and efficient management of ethics for the construction industry. This research has investigated the ethical perceptions of contractors and designers in the China construction industry. A questionnaire survey which contains 15 ethical issues and 6 demographic factors has been conducted. 170 construction professionals from construction companies and consulting companies have been participated in this survey. These 15 ethical issues are ranked in terms of seriousness, frequency and importance for both contractors and designers as a single group to understand the overall perceptions in the industry. The analysis has also been conducted for contractors and designers respectively to make comparisons between them. The top three serious ethical issues in the industry are ‘Bribery and corruption’, ‘Failure to practice whistle-blowing’ and ‘Improper bidding practices’. Contractors and designers showed similar outcomes for the top five important ethical issues. But for the middle ranged ethical issues, they showed some differences. Further researches are required to identify the causes of the similarity and differences.

  13. 48 CFR 970.2703-2 - Patent rights clause provisions for management and operating contractors.

    Science.gov (United States)

    2010-10-01

    ...-by-case basis. If the time period expired due to negligence by the contractor, DOE may grant a... to avoid such negligence in the future. If a contractor is requesting an extension of time in which... Law 101-189, section 3133(d), and the DOE owned facility is involved in weapons related research and...

  14. Global petroleum fiscal systems compared by contractor take

    International Nuclear Information System (INIS)

    Johnston, D.

    1994-01-01

    Petroleum fiscal terms in most countries are tougher than in the US, but these countries have more geological potential and still may be economically attractive. The market for exploration capital and technology is super competitive and getting more sophisticated. Governments are increasingly aware of the global market for exploration acreage or rehabilitation projects. For many oil companies, an important part of the negotiations is to secure terms acceptable to the potential partner. Knowing the market and what terms are realistic depends on a region's potential and other factors. Most countries developing petroleum fiscal systems are opting for the production sharing contract (PSC). This trend began in the 1960s. Now, nearly half of the countries with petroleum potential have a system based on the PSC. However, financial results could be the same in a royalty/tax arrangement. Economics depend primarily on division of profits or what is known as government/contractor take. The paper discusses contractor take, estimating take, Indonesian split, and take implications

  15. Calculated concentrations of any radionuclide deposited on the ground by release from underground nuclear detonations, tests of nuclear rockets, and tests of nuclear ramjet engines

    International Nuclear Information System (INIS)

    Hicks, H.G.

    1981-11-01

    This report presents calculated gamma radiation exposure rates and ground deposition of related radionuclides resulting from three types of event that deposited detectable radioactivity outside the Nevada Test Site complex, namely, underground nuclear detonations, tests of nuclear rocket engines and tests of nuclear ramjet engines

  16. 75 FR 42164 - Notice of Final Determination Updating the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2010-07-20

    ... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor... Guidelines for Maintenance of the List of Products Requiring Federal Contractor Certification as to Forced or.... 13126 (``Prohibition of Acquisition of Products Produced by Forced or Indentured Child Labor''), in...

  17. A Novel Approach to Selecting Contractor in Agent-based Multi-sensor Battlefield Reconnaissance Simulation

    Directory of Open Access Journals (Sweden)

    Xiong Li

    2012-11-01

    Full Text Available This paper presents a novel approach towards showing how contractor in agent-based simulation for complex warfare system such as multi-sensor battlefield reconnaissance system can be selected in Contract Net Protocol (CNP with high efficiency. We first analyze agent and agent-based simulation framework, CNP and collaborators, and present agents interaction chain used to actualize CNP and establish agents trust network. We then obtain contractor's importance weight and dynamic trust by presenting fuzzy similarity-based algorithm and trust modifying algorithm, thus we propose contractor selecting approach based on maximum dynamic integrative trust. We validate the feasibility and capability of this approach by implementing simulation, analyzing compared results and checking the model.

  18. Summary of hydrogeologic controls on ground-water flow at the Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    Laczniak, R.J.; Cole, J.C.; Sawyer, D.A.; Trudeau, D.A.

    1996-01-01

    The underground testing of nuclear devices has generated substantial volumes of radioactive and other chemical contaminants below ground at the Nevada Test Site (NTS). Many of the more radioactive contaminants are highly toxic and are known to persist in the environment for thousands of years. In response to concerns about potential health hazards, the US Department of Energy, under its Environmental Restoration Program, has made NTS the subject of a long-term investigation. Efforts will assess whether byproducts of underground testing pose a potential hazard to the health and safety of the public and, if necessary, will evaluate and implement steps to remediate any of the identified dangers. Ground-water flow is the primary mechanism by which contaminants can be transported significant distances away from the initial point of injection. Flow paths between contaminant sources and potential receptors are separated by remote areas that span tens of miles. The diversity and structural complexity of the rocks along these flow paths complicates the hydrology of the region. Although the hydrology has been studied in some detail, much still remains uncertain about flow rates and directions through the fractured-rock aquifers that transmit water great distances across this arid region. Unique to the hydrology of NTS are the effects of underground testing, which severely alter local rock characteristics and affect hydrologic conditions throughout the region. This report summarizes what is known and inferred about ground-water flow throughout the NTS region. The report identifies and updates what is known about some of the major controls on ground-water flow, highlights some of the uncertainties in the current understanding, and prioritizes some of the technical needs as related to the Environmental Restoration Program. 113 refs

  19. Impact of Extending Sexual Orientation and Gender Identity Nondiscrimination Requirements to Federal Contractors

    OpenAIRE

    Badgett, M.V. Lee

    2012-01-01

    A federal executive order that would require contractors to prohibit discrimination based on sexual orientation and gender identity would protect up to 16.5 million more workers than are already protected by state or private anti-discrimination policies. Currently, state laws or private voluntary policies already protect 61% of federal contractor employees from sexual orientation discrimination and 41% from gender identity discrimination. Research also suggests an executive order would not di...

  20. Single event effect ground test results for a fiber optic data interconnect and associated electronics

    International Nuclear Information System (INIS)

    LaBel, K.A.; Hawkins, D.K.; Cooley, J.A.; Stassinopoulos, E.G.; Seidleck, C.M.; Marshall, P.; Dale, C.; Gates, M.M.; Kim, H.S.

    1994-01-01

    As spacecraft unlock the potential of fiber optics for spaceflight applications, system level bit error rates become of concern to the system designer. The authors present ground test data and analysis on candidate system components

  1. Treatability tests on water from a low-level waste burial ground

    International Nuclear Information System (INIS)

    Taylor, P.A.

    1990-01-01

    Lab-scale treatability tests on trench water from a low-level waste burial ground have shown that the water can be successfully treated by existing wastewater treatment plants at Oak Ridge National Laboratory. Water from the four most highly contaminated trenches that had been identified to date was used in the treatability tests. The softening and ion exchange processes used in the Process Wastewater Treatment Plant removed Sr-90 from the trench water, which was the only radionuclide present at above the discharge limits. The air stripping and activated carbon adsorption processes used in the Nonradiological Wastewater Treatment Plant removed volatile and semi-volatile organics, which were the main contaminants in the trench water, to below detection limits. 6 refs., 2 figs., 7 tabs

  2. Status of the ground water flow model for the UMTRA Project, Shiprock, New Mexico, site

    International Nuclear Information System (INIS)

    1995-01-01

    A two-dimensional numerical model was constructed for the alluvial aquifer in the area of the Uranium Mill Tailings Remedial Action (UMTRA) Project Shiprock, New Mexico, site. This model was used to investigate the effects of various hydrologic parameters on the evolution of the ground water flow field. Results of the model are useful for defining uncertainties in the site conceptual model and suggesting data collection efforts to reduce these uncertainties. The computer code MODFLOW was used to simulate the two-dimensional flow of ground water in the alluvium. The escarpment was represented as a no-flow boundary. The San Juan River was represented with the MODFLOW river package. A uniform hydraulic conductivity distribution with the value estimated by the UMTRA Project Technical Assistance Contractor (TAC) and a uniform recharge distribution was used. Infiltration from the flowing artesian well was represented using the well package. The ground water flow model was calibrated to ground water levels observed in April 1993. Inspection of hydrographs shows that these levels are representative of typical conditions at the site

  3. Determining Success Criteria and Success Factors for International Construction Projects for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    Ali Mohammed Alashwal

    2017-06-01

    Full Text Available The success of international construction projects is fraught with various challenges such as competitiveness, lack of resources, versatile global economy, and specific conditions in the host country. Malaysian contractors have been venturing into global construction market since early 1980s. However, their venturing was not successful all the time. The number of international projects awarded to Malaysian contractors has reduced drastically during the past decade. Taking advantage of this experience, this paper aims to identify the success criteria and success factors of international construction projects. The data was collected from 120 respondents using a questionnaire survey and analysed using principal component analysis and regression analysis. The results revealed three principal criteria of project success namely, Management Success, Functional Success, and Organisation Success. The main components of success factors include Team Power and Skills, Resource Availability, External Environment, Organisation Capability, Project Support, and Project Organisation. Further analysis emphasized the importance of strong financing capacity of contractors, project social environment, and competence of the project manager in achieving project success. The results of this paper can serve as a guideline for contractors and project managers to achieve success in this context. Future studies may provide in-depth analysis of success criteria and success factors specific for construction project type and host-country location.

  4. Transonic and supersonic ground effect aerodynamics

    Science.gov (United States)

    Doig, G.

    2014-08-01

    A review of recent and historical work in the field of transonic and supersonic ground effect aerodynamics has been conducted, focussing on applied research on wings and aircraft, present and future ground transportation, projectiles, rocket sleds and other related bodies which travel in close ground proximity in the compressible regime. Methods for ground testing are described and evaluated, noting that wind tunnel testing is best performed with a symmetry model in the absence of a moving ground; sled or rail testing is ultimately preferable, though considerably more expensive. Findings are reported on shock-related ground influence on aerodynamic forces and moments in and accelerating through the transonic regime - where force reversals and the early onset of local supersonic flow is prevalent - as well as more predictable behaviours in fully supersonic to hypersonic ground effect flows.

  5. Program Evaluation: A Consumer Evaluation of Alternative Contractor Concepts in Government Food Service

    Science.gov (United States)

    1974-09-01

    food service facilities. The food factors (quality, variety, and quantity, in that order) were generally rated by consumers as most serious problems, in keeping with many previous survey studies of military food service system. The contractor food service concept with raw food provided by the contractor, as exemplified by Fort Myer, significantly reduced consumer problems in food service personnel, speed, hours, environment, and convenience of location, and also reduced the degree to which food variety,

  6. GROUNDED THEORY METHODOLOGY and GROUNDED THEORY RESEARCH in TURKEY

    OpenAIRE

    ARIK, Ferhat; ARIK, Işıl Avşar

    2016-01-01

    This research discusses the historical development of the Grounded Theory Methodology, which is one of the qualitative research method, its transformation over time and how it is used as a methodology in Turkey. The Grounded Theory which was founded by Strauss and Glaser, is a qualitative methodology based on inductive logic to discover theories in contrast with the deductive understanding which is based on testing an existing theory in sociology. It is possible to examine the Grounded Theory...

  7. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Science.gov (United States)

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  8. 48 CFR 919.7006 - Incentives for DOE contractor participation.

    Science.gov (United States)

    2010-10-01

    ... disadvantaged businesses, women-owned small businesses, HBCUs, other minority institutions of higher learning... contractor participation. 919.7006 Section 919.7006 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Department of Energy Mentor-Protege Program 919...

  9. Taking advantage of ground data systems attributes to achieve quality results in testing software

    Science.gov (United States)

    Sigman, Clayton B.; Koslosky, John T.; Hageman, Barbara H.

    1994-01-01

    During the software development life cycle process, basic testing starts with the development team. At the end of the development process, an acceptance test is performed for the user to ensure that the deliverable is acceptable. Ideally, the delivery is an operational product with zero defects. However, the goal of zero defects is normally not achieved but is successful to various degrees. With the emphasis on building low cost ground support systems while maintaining a quality product, a key element in the test process is simulator capability. This paper reviews the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) test tool that is used in the acceptance test process for unmanned satellite operations control centers. The TASS is designed to support the development, test and operational environments of the Goddard Space Flight Center (GSFC) operations control centers. The TASS uses the same basic architecture as the operations control center. This architecture is characterized by its use of distributed processing, industry standards, commercial off-the-shelf (COTS) hardware and software components, and reusable software. The TASS uses much of the same TPOCC architecture and reusable software that the operations control center developer uses. The TASS also makes use of reusable simulator software in the mission specific versions of the TASS. Very little new software needs to be developed, mainly mission specific telemetry communication and command processing software. By taking advantage of the ground data system attributes, successful software reuse for operational systems provides the opportunity to extend the reuse concept into the test area. Consistency in test approach is a major step in achieving quality results.

  10. Is Late or Non-Payment a Significant Problem to Malaysian Contractors?

    Directory of Open Access Journals (Sweden)

    M.E. Che Munaaim

    2007-12-01

    Full Text Available Some developed countries have drawn lip construction-specific statutory security of payment acts/legislations typically known as Construction Contracts Act to eliminate poor payment practices and to assist continuous uninterrupted construction works. Malaysia too cannot pretend not to have these problems. This paper presents findings of a study conducted amongst Malaysian contractors with the aims to determine the seriousness of late and non- payment problems; to identify the main causes and effects of late and non-payment; and to identify ways to sustain the payment flows in the Malaysian construction industry. The study focused on contractual payments from the paymaster (government or private to the contractors. The main factors for late and nonpayment in the construction industry identified from the study include: delay in certification, paymaster's poor financial management, local culture/attitude, pay master's failure to implement good governance in business, underpayment of certified amounts by the pay master and the use of 'pay when paid' clauses in contracts. The research findings show that late and non-payment can create cash flow problems, stress and financial hardship on the contractors. Amongst the most appropriate solutions to overcome the problem of late and non-payment faced by local contractors include: a right to regular periodic payment, a right to a defined time frame (or payment and a right to a speedy dispute resolution mechanism. Promptness of submitting, processing, issuing interim payment certificates and honouring the certificates are extremely important issues in relation to progress payment claims. Perhaps, an increased sense of professionalism in construction industry could overcome some of the problems related to late and non- payment issues.

  11. Centrifugal contractors for laboratory-scale solvent extraction tests

    International Nuclear Information System (INIS)

    Leonard, R.A.; Chamberlain, D.B.; Conner, C.

    1995-01-01

    A 2-cm contactor (minicontactor) was developed and used at Argonne National Laboratory for laboratory-scale testing of solvent extraction flowsheets. This new contactor requires only 1 L of simulated waste feed, which is significantly less than the 10 L required for the 4-cm unit that had previously been used. In addition, the volume requirements for the other aqueous and organic feeds are reduced correspondingly. This paper (1) discusses the design of the minicontactor, (2) describes results from having applied the minicontactor to testing various solvent extraction flowsheets, and (3) compares the minicontactor with the 4-cm contactor as a device for testing solvent extraction flowsheets on a laboratory scale

  12. Financial Analysis for Phase 1 Privatization for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BASCHE, A.D.

    2000-01-01

    The purpose of the Financial Analysis for Phase 1 Privatization for the Tank Farm Contractor is to provide a third-party quantitative and qualitative cost and schedule risk analysis of HNF-1946. The purpose of this Financial Analysis for Phase 1 Privatization for the Tank Farm Contractor (TFC) is to document the results of the risk-based financial analysis of HNF-1946, Programmatic Baseline Summary for Phase 1 Privatization f o r the Tank Farm Contractor (Diediker 2000). This analysis was performed to evaluate how well the proposed baseline meets the U. S. Department of Energy, Office of River Protection (ORP) Letter OO-MSO-009, ''Contract NO. DE-AC06-99RL14047--The US Department of Energy, Office of River Protection (ORP) Mission Planning Guidance for Fiscal Year (FY) 2002--Revision 1'' (Short 2000). The letter requires a confidence level in the baseline schedule that is consistent with the Phase 1A readiness-to-proceed (RTP) assessment conducted in fiscal year (FY) 1998. Because the success of the project depends not only on the budget but also on the schedule, this risk analysis addresses both components of the baseline

  13. Preaward Evaluation and Responsibility Determination of Foreign Contractors.

    Science.gov (United States)

    1988-12-01

    3 Contractor Country Contract Number Bundesamt Fuer Wehrtechnik FRG DAJA3786C0326 Bundesamt Fuer Wehrtechnik FRG F6154686D0022 Construcciones ...Aeronauticas SA Spain F0960385C0006 Construcciones Aeronauticas SA Spain F4260086C6464 Daimler Benz AG FRG DAJA3778GOO11 Eaton Corp. FRG F0960382D0663

  14. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  15. Embracing Safe Ground Test Facility Operations and Maintenance

    Science.gov (United States)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  16. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds

    Science.gov (United States)

    2014-08-01

    State departments of transportation rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in providing guidance that State transporta...

  17. Ground rubber: Sorption media for ground water containing benzene and O-xylene

    International Nuclear Information System (INIS)

    Kershaw, D.S.; Pamukcu, S.

    1997-01-01

    The purpose of the current study is to examine the ability of ground rubber to sorb benzene and O-xylene from water contained with aromatic hydrocarbons. The study consisted of running both batch and packed bed column tests to determine the sorption capacity, the required sorption equilibration time, and the flow through utilization efficiency of ground rubber under various contact times when exposed to water contaminated with various amounts of benzene or O-xylene. Initial batch test results indicate that ground rubber can attain equilibrium sorption capacities up to 1.3 or 8.2 mg of benzene or O-xylene, respectively, per gram of tire rubber at solution equilibrium concentrations of 10 mg/L. Packed bed column tests indicate that ground tire rubber has on the average a 40% utilization rate when a hydraulic residence time of 15 min is used. Possible future uses of round rubber as a sorption media could include, but are not limited to, the use of ground rubber as an aggregate in slurry cutoff walls that are in contact with petroleum products. Ground rubber could also be used as a sorption media in pump-and-treat methodologies or as a sorption media in in-situ reactive permeable barriers

  18. Department of Energy standard for the performance testing of personnel dosimetry systems

    International Nuclear Information System (INIS)

    1986-12-01

    This standard is intended to be used in the Department of Energy Laboratory Accreditation Program (DOELAP) for personnel dosimetry systems. It is based on the American National Standards Institute's (ANSI) ''Criteria for Testing Personnel Dosimetry Performance,'' ANSI N13.11-1983, recommendations made to DOE in ''Guidelines for the Calibration of Personnel Dosimeters,'' Pacific Northwest Laboratory (PNL)-4515 and comments received during peer review by DOE and DOE contractor personnel. The recommendations contained in PNL-4515 were based on an evaluation of ANSI N13.11 conducted for the Office of Nuclear Safety, DOE, by PNL. Parts of ANSI N13.11 that did not require modification were used essentially intact in this standard to maintain consistency with nationally recognized standards. Modifications to this standard have resulted from several DOE/DOE contractor reviews and a pilot testing session. An initial peer review by selected DOE and DOE contractor representatives on technical content was conducted in 1983. A review by DOE field offices, program offices, and contractors was conducted in mid-1984. A pilot performance testing session sponsored by the Office of Nuclear Safety was conducted in early 1985 by the Radiological and Environmental Sciences Laboratory, Idaho Falls. Results of the pilot test were reviewed in late 1985 by a DOE and DOE contractor committee. 11 refs., 4 tabs

  19. Recent Ground Hold and Rapid Depressurization Testing of Multilayer Systems

    Science.gov (United States)

    Johnson, Wesley L.

    2014-01-01

    In the development of flight insulation systems for large cryogenic orbital storage (spray on foam and multilayer insulation), testing need include all environments that are experienced during flight. While large efforts have been expended on studying, bounding, and modeling the orbital performance of the insulation systems, little effort has been expended on the ground hold and ascent phases of a mission. Historical cryogenic in-space systems that have flown have been able to ignore these phases of flight due to the insulation system being within a vacuum jacket. In the development phase of the Nuclear Mars Vehicle and the Shuttle Nuclear Vehicle, several insulation systems were evaluated for the full mission cycle. Since that time there had been minimal work on these phases of flight until the Constellation program began investigating cryogenic service modules and long duration upper stages. With the inception of the Cryogenic Propellant Storage and Transfer Technology Demonstration Mission, a specific need was seen for the data and as such, several tests were added to the Cryogenic Boil-off Reduction System liquid hydrogen test matrix to provide more data on a insulation system. Testing was attempted with both gaseous nitrogen (GN2) and gaseous helium (GHe) backfills. The initial tests with nitrogen backfill were not successfully completed due to nitrogen liquefaction and solidification preventing the rapid pumpdown of the vacuum chamber. Subsequent helium backfill tests were successful and showed minimal degradation. The results are compared to the historical data.

  20. Owner and Contractor Perceptions Toward Factors Causing Delays in Structural and Finishing Works

    Directory of Open Access Journals (Sweden)

    Loanata V.R.

    2010-01-01

    Full Text Available A construction project comprises of a number of work packages, which are subjected to delays. These delays may be caused by many on-site factors. The aim of this research is to represent owner and contractors perceptions towards delay factors that frequently occur in structural and finishing works. Data for analysis were gathered by distributing questionnaire. A total of 198 sets of questionnaire were gathered and used for subsequent analyses. In general, design changes during construction are perceived by respondents as the most frequent factor to cause delay in all structural and finishing works. The results also show that there are a number of differences between owner’s and contractor’s perceptions towards the occurrences of the factors. Whilst most contractors concern that information factors related to project design and scope frequently causing delays in construction works, owners consider many contractor originated factors, as most frequent delay causes.

  1. 77 FR 54864 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2012-09-06

    ....g., late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to report... applicable) (e.g.; late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to... that allowing contractors to ``report to the CPARS system'' would have a negative impact on future...

  2. A Management Case Analysis of the Department of Defense Contractor Risk Assessment Guide Program

    Science.gov (United States)

    1990-12-01

    ORGANIZATION ......... 17 1. Past Government Organization Problems... 17 2. Current Government Organization ......... 17 3. The Contractor’s Organizatin ...Program and urged CODSIA to take a leadership role in encouraging its members to participate. The DCAA [Ref ll:p. 45] informed defense contractors in...conferences, and through the leadership of officials including the Under Secretary of the Navy for Acquisition, DOD Comptroller General, DOD Inspector General

  3. Strength and durability tests of pipeline supports for the areas of above-ground routing under the influence of operational loads

    Directory of Open Access Journals (Sweden)

    Surikov Vitaliy Ivanovich

    2014-03-01

    Full Text Available The present article deals with integrated research works and tests of pipeline supports for the areas of above-ground routing of the pipeline system “Zapolyarye - Pur-pe” which is laid in the eternally frozen grounds. In order to ensure the above-ground routing method for the oil pipeline “Zapolyarye - Pur-pe” and in view of the lack of construction experience in case of above-ground routing of oil pipelines, the leading research institute of JSC “Transneft” - LLC “NII TNN” over the period of August, 2011 - September, 2012 performed a research and development work on the subject “Development and production of pipeline supports and pile foundation test specimens for the areas of above-ground routing of the pipeline system “Zapolyarye - Pur-pe”. In the course of the works, the test specimens of fixed support, linear-sliding and free-sliding pipeline supports DN1000 and DN800 were produced and examined. For ensuring the stable structural reliability of the supports constructions and operational integrity of the pipelines the complex research works and tests were performed: 1. Cyclic tests of structural elements of the fixed support on the test bed of JSC “Diascan” by means of internal pressure and bending moment with the application of specially prepared equipment for defining the pipeline supports strength and durability. 2. Tests of the fixed support under the influence of limit operating loads and by means of internal pressure for confirming the support’s integrity. On the test bed there were simulated all the maximum loads on the support (vertical, longitudinal, side loadings, bending moment including subsidence of the neighboring sliding support and, simultaneously, internal pressure of the carried medium. 3. Cyclic tests of endurance and stability of the displacements of sliding supports under the influence of limit operating loads for confirming their operation capacity. Relocation of the pipeline on the sliding

  4. PhoneSat: Ground Testing of a Phone-Based Prototype Bus

    Science.gov (United States)

    Felix, Carmen; Howard, Benjamin; Reyes, Matthew; Snarskiy, Fedor; Hickman, Ryan; Boshuizen, Christopher; Marshall, William

    2010-01-01

    Most of the key capabilities that are requisite of a satellite bus are housed in today's smart phones. PhoneSat refers to an initiative to build a ground-based prototype vehicle that could all the basic functionality of a satellite, including attitude control, using a smart Phone as its central hardware. All components used were also low cost Commercial off the Shelf (COTS). In summer 2009, an initial prototype was created using the LEGO Mindstorm toolkit demonstrating simple attitude control. Here we report on a follow up initiative to design, build and test a vehicle based on the Google s smart phone Nexus One. The report includes results from initial thermal-vacuum chamber tests and low altitude sub-orbital rocket flights which show that, at least for short durations, the Nexus One phone is able to withstand key aspects of the space environment without failure. We compare the sensor data from the Phone's accelerometers and magnetometers with that of an external microelectronic inertial measurement unit.

  5. 41 CFR 109-1.5204 - Review and approval of a designated contractor's personal property management system.

    Science.gov (United States)

    2010-07-01

    ... property management system. (a) An initial review of a designated contractor's personal property management... follow-on contract. The purpose of the review is to determine whether the contractor's system provides... by the property administrator that all major system deficiencies identified in the review or...

  6. Probabilistic prediction of expected ground condition and construction time and costs in road tunnels

    Directory of Open Access Journals (Sweden)

    A. Mahmoodzadeh

    2016-10-01

    Full Text Available Ground condition and construction (excavation and support time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding.

  7. Summary Report of the Seventh Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    Science.gov (United States)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership" provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processes, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission.

  8. Eleventh annual report of radiation exposures for DOE and DOE contractor employees

    International Nuclear Information System (INIS)

    1978-01-01

    In 1968, the US Atomic Energy Commission (AEC) established a program for reporting certain occupationa radiation exposure information to a central radiation records repository maintained at the Union Carbide Computing Technology Center, Oak Ridge, Tennessee. Annual summaries (WASH-1350-R1 through WASH-1350-R6) were reported for the years 1968-1973 and included data on AEC contracter employees as well as employees of companies in the private sector licensed by the AEC. In January 1975, the operational functions of the AEC, including the maintenance of records on the occupational radiation exposure on contractor employees, were transferred to the Energy Research and Development Administration (ERDA) and the AEC's regulatory functions, including the reporting of information on the occupational radiation exposure of licenses, were transferred to the Nuclear Regulatory Commission (NRC). Previous AEC licenses then reported to NRC while the contractors reported to ERDA. On October 1, 1977, the Department of Energy (DOE) was formed and assumed the responsibilities of ERDA. This report contains the 1978 radiation exposure data for DOE and DOE contractors

  9. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  10. A pattern of contractor selection for oil and gas industries in a safety approach using ANP-DEMATEL in a Grey environment.

    Science.gov (United States)

    Gharedaghi, Gholamreza; Omidvari, Manouchehr

    2018-01-11

    Contractor selection is one of the major concerns of industry managers such as those in the oil industry. The objective of this study was to determine a contractor selection pattern for oil and gas industries in a safety approach. Assessment of contractors based on specific criteria and ultimately selecting an eligible contractor preserves the organizational resources. Due to the safety risks involved in the oil industry, one of the major criteria of contractor selection considered by managers today is safety. The results indicated that the most important safety criterion of contractor selection was safety records and safety investments. This represented the industry's risks and the impact of safety training and investment on the performance of other sectors and the overall organization. The output of this model could be useful in the safety risk assessment process in the oil industry and other industries.

  11. Settlement mechanism of the backfilled ground around nuclear power plant buildings. Part 2. A series of centrifuge tests and a numerical simulation by using FEM about a typical test result

    International Nuclear Information System (INIS)

    Kawai, Tadashi; Ishimaru, Makoto

    2009-01-01

    During the Niigataken Chuetsu-oki earthquake, rather large settlements of the backfill ground around the rigid and stable buildings were observed. In this study, five cases of centrifuge tests with shaking events were conducted to reproduce the similar type of the settlements in order to examine the mechanism of the settlements. The results from those tests showed that the ground was settled by the negative dilatancy of sandy soils anywhere in the model ground and the additional settlements were suddenly caused when the backfill ground was apart from the rigid wall modeling the rigid and stable buildings, namely a sliding failure in an active state was occurred in the backfill ground near the structure. It was confirmed that these settlements were able to be estimated by a simple method proposed in this report, in which only the differences between the self-weight of the sliding block and the soil strength calculated at the initial stress conditions were considered as the driving forces of the sliding failure, and then the accelerations calculated from the forces being divided by the mass of the sliding block were simply integrated two times with respected to the time when the ground was apart from the structure. Further, a numerical simulation by using FEM about a typical test result was conducted, and these settlements were well simulated. (author)

  12. Motor sport in France: testing-ground for the world.

    Science.gov (United States)

    Cofaigh, Eamon O

    2011-01-01

    The birth of the automobile in the late nineteenth century was greeted with a mixture of awe, scepticism and sometimes even disdain from sections of the European public. In this article, the steps taken in France to pioneer and promote this new invention are examined. Unreliable and noisy, the early automobile owes a debt of gratitude to the French aristocracy who organised and codified motor racing in an effort to test these new inventions while at the same time introduce them to a wider public. City-to-city races demonstrated the potential of the automobile before the initiative of Gordon Bennett proved to be the catalyst for the birth of international motor sport as we recognise it today. Finally this article looks at the special connection between Le Mans and the automobile. Le Mans has, through its 24-hour race, maintained a strong link with the development of everyday automobile tourism and offers the enthusiast an alternative to the machines that reach incredible speeds on modern-day closed circuits. This article examines how French roads were veritable testing grounds for the earliest cars and how the public roads of Le Mans maintain the tradition to this day.

  13. Seismic Safety Program: Ground motion and structural response

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    In 1964, John A. Blume & Associates Research Division (Blume) began a broad-range structural response program to assist the Nevada Operations Office of the US Atomic Energy Commission (AEC) in ensuring the continued safe conduct of underground nuclear detonation testing at the Nevada Test Site (NTS) and elsewhere. Blume`s long experience in earthquake engineering provided a general basis for the program, but much more specialized knowledge was required for the AEC`s purposes. Over the next 24 years Blume conducted a major research program to provide essential understanding of the detailed nature of the response of structures to dynamic loads such as those imposed by seismic wave propagation. The program`s results have been embodied in a prediction technology which has served to provide reliable advanced knowledge of the probable effects of seismic ground motion on all kinds of structures, for use in earthquake engineering and in building codes as well as for the continuing needs of the US Department of Energy`s Nevada Operations Office (DOE/NV). This report is primarily an accounting of the Blume work, beginning with the setting in 1964 and the perception of the program needs as envisioned by Dr. John A. Blume. Subsequent chapters describe the structural response program in detail and the structural prediction procedures which resulted; the intensive data acquisition program which, as is discussed at some length, relied heavily on the contributions of other consultant-contractors in the DOE/NV Seismic Safety Support Program; laboratory and field studies to provide data on building elements and structures subjected to dynamic loads from sources ranging from testing machines to earthquakes; structural response activities undertaken for testing at the NTS and for off-NTS underground nuclear detonations; and concluding with an account of corollary studies including effects of natural forces and of related studies on building response.

  14. Final test results for the ground operations demonstration unit for liquid hydrogen

    Science.gov (United States)

    Notardonato, W. U.; Swanger, A. M.; Fesmire, J. E.; Jumper, K. M.; Johnson, W. L.; Tomsik, T. M.

    2017-12-01

    Described herein is a comprehensive project-a large-scale test of an integrated refrigeration and storage system called the Ground Operations and Demonstration Unit for Liquid Hydrogen (GODU LH2), sponsored by the Advanced Exploration Systems Program and constructed at Kennedy Space Center. A commercial cryogenic refrigerator interfaced with a 125,000 l liquid hydrogen tank and auxiliary systems in a manner that enabled control of the propellant state by extracting heat via a closed loop Brayton cycle refrigerator coupled to a novel internal heat exchanger. Three primary objectives were demonstrating zero-loss storage and transfer, gaseous liquefaction, and propellant densification. Testing was performed at three different liquid hydrogen fill-levels. Data were collected on tank pressure, internal tank temperature profiles, mass flow in and out of the system, and refrigeration system performance. All test objectives were successfully achieved during approximately two years of testing. A summary of the final results is presented in this paper.

  15. TECHNICAL AND ECONOMICAL ANALYSIS OF LOGGING CONTRACTORS

    Directory of Open Access Journals (Sweden)

    Abilio Donizetti de Morais Filho

    2009-09-01

    Full Text Available The objective of this study was to describe the financial conditions of forestry contractors, concerning life quality aspects, condition of work and equipments, operational costs, and economic credit to invest in new technologies. Five companies had been analyzed, with an annual income between US$ 400,000.00 and US$ 1,720,000.00, with an average of US$ 950,000.00. The number of employees varied between 33 and 181, and the companies were classified in terms of size as: one small, two average, and two big. The main difficulties to invest in new machines were high financial taxes, more than 12% an year, and a lack of long term contracts to guarantee the payment capability. It was observed that the contractors did not consider the capital remuneration and a correct depreciation of machines, resulting in an average machine life higher than 10 years. The final conclusions were that the costs were above the paid values for the services, when computed the depreciation and capital remuneration, with negative results in the financial analyzes of three companies. Finally, the mechanization process increased the workers life quality, however, the annual income was around US$ 2,112.00 per worker, approximately 39% lower than the average Brazilian population.

  16. The selection of construction sub-contractors using the fuzzy sets theory

    International Nuclear Information System (INIS)

    Krzemiński, Michał

    2015-01-01

    The paper presents the algorithm for the selection of sub-contractors. Main area of author’s interest is scheduling flow models. The ranking task aims at execution time as short as possible Brigades downtime should also be as small as possible. These targets are exposed to significant obsolescence. The criteria for selection of subcontractors will not be therefore time and cost, it is assumed that all those criteria be meet by sub-contractors. The decision should be made in regard to factors difficult to measure, to assess which is the perfect application of fuzzy sets theory. The paper will present a set of evaluation criteria, the part of the knowledge base and a description of the output variable

  17. Assessing the readiness of contractors in implementing low carbon ...

    African Journals Online (AJOL)

    For the implementation of low carbon construction in our construction industry, the contractors need to be ready and have knowledge to adopt low carbon construction ... A checklist was established by summarizing the highest low carbon activities from each category which were sustainable site planning and management, ...

  18. 78 FR 12106 - Debarment, Suspension, and Ineligibility of Contractors

    Science.gov (United States)

    2013-02-21

    ... include a recommendation by the SDC as to a proposed course of action; (2) The debarment decision-making... proposed debarment; (3) The suspension decision-making process, which shall afford the contractor (and any... Management, Contracting; Attention: Contracting Policy, 1900 E Street NW., Washington, DC 20415; or email...

  19. 75 FR 3977 - Addressing Tax Delinquency by Government Contractors

    Science.gov (United States)

    2010-01-25

    ... Part II The President Memorandum of January 20, 2010--Addressing Tax Delinquency by Government... of January 20, 2010 Addressing Tax Delinquency by Government Contractors Memorandum for the Heads of... contracts are awarded to tens of thousands of companies with serious tax delinquencies. The total amount in...

  20. The operation of contractors on nuclear sites: French regulations

    International Nuclear Information System (INIS)

    Mayoux, J.C.; Derche, B.

    1985-01-01

    The first purpose of this paper is to show how the French common law -as it results from the code of labour and holdings of the courts- deals with the intervention of contractors. The second part analyses the special regulations in force to ensure radiation protection [fr

  1. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  2. Methodology of Accelerated Life-Time Tests For Stirling-Type "Bae-Co"-Made Cryocoolers Against Displacer-Blockage by Cryo-Pollutant Deposits

    National Research Council Canada - National Science Library

    Getmanits, Vladimir

    2000-01-01

    ...: The contractor will investigate techniques for accelerated testing of cryocooler technology. During this phase of the effort the contractor will perform a detailed design of the equipment needed to conduct accelerated testing...

  3. Ground Testing a Nuclear Thermal Rocket: Design of a sub-scale demonstration experiment

    Energy Technology Data Exchange (ETDEWEB)

    David Bedsun; Debra Lee; Margaret Townsend; Clay A. Cooper; Jennifer Chapman; Ronald Samborsky; Mel Bulman; Daniel Brasuell; Stanley K. Borowski

    2012-07-01

    In 2008, the NASA Mars Architecture Team found that the Nuclear Thermal Rocket (NTR) was the preferred propulsion system out of all the combinations of chemical propulsion, solar electric, nuclear electric, aerobrake, and NTR studied. Recently, the National Research Council committee reviewing the NASA Technology Roadmaps recommended the NTR as one of the top 16 technologies that should be pursued by NASA. One of the main issues with developing a NTR for future missions is the ability to economically test the full system on the ground. In the late 1990s, the Sub-surface Active Filtering of Exhaust (SAFE) concept was first proposed by Howe as a method to test NTRs at full power and full duration. The concept relied on firing the NTR into one of the test holes at the Nevada Test Site which had been constructed to test nuclear weapons. In 2011, the cost of testing a NTR and the cost of performing a proof of concept experiment were evaluated.

  4. Agencies Need Improved Financial Data Reporting for Private Security Contractors

    National Research Council Canada - National Science Library

    Warren, David R; Bianco, Michael A; Nasser, Waheed; Kusman, Richard R; Shafer, James; Venner, Jason; Walls, Lovell Q; Wright, Samson J

    2008-01-01

    Section 842 of the National Defense Authorization Act of 2008 (Public Law 110-181), required SIGIR to, among other things, develop a plan to evaluate various characteristics of contracting for private security contractor services in Iraq...

  5. Pre-Flight Ground Testing of the Full-Scale HIFiRE-1 at Fully Duplicated Flight Conditions

    National Research Council Canada - National Science Library

    Wadhams, Tim P; MacLean, Matthew G; Holden, Michael S; Mundy, Erik

    2008-01-01

    As part of an experimental study to obtain detailed heating and pressure data over the full-scale HIFiRE-1 flight geometry, CUBRC has completed a 30-run matrix of ground tests, sponsored by the AFOSR...

  6. 9 CFR 201.94 - Information as to business; furnishing of by packers, swine contractors, live poultry dealers...

    Science.gov (United States)

    2010-01-01

    ... of by packers, swine contractors, live poultry dealers, stockyard owners, market agencies, and... poultry dealers, stockyard owners, market agencies, and dealers. Each packer, swine contractor, live poultry dealer, stockyard owner, market agency, and dealer, upon proper request, shall give to the...

  7. Bretylium potentiation of the contractor responses of isolated rabbit aortic strips to potassium and tyramine.

    Science.gov (United States)

    Kurahashi, K; Shibata, S

    1971-09-01

    1. Pretreatment of rabbit aortic strips with bretylium potentiated the contractor response to potassium and tyramine but not to noradrenaline. On the other hand, such pretreatment inhibited the response to nicotine.2. Even in reserpinized or cold stored aortic strips, pretreatment with bretylium enhanced the contractor response to potassium and tyramine.3. Pretreatment of fresh, reserpinized, or cold stored aortic strips with pheniprazine potentiated the contractor response to potassium and tyramine.4. Pretreatment of aortic strips with bretylium or pheniprazine did not potentiate the response to 5-hydroxytryptamine (5-HT).5. The results indicate that both bretylium and pheniprazine potentiate the action of tyramine and potassium, not by presynaptic mechanisms, but by postsynaptic action, causing an increase in the sensitivity of the effector cells to the stimulants.

  8. 24 CFR 1000.44 - What prohibitions on the use of debarred, suspended, or ineligible contractors apply?

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false What prohibitions on the use of debarred, suspended, or ineligible contractors apply? 1000.44 Section 1000.44 Housing and Urban Development... § 1000.44 What prohibitions on the use of debarred, suspended, or ineligible contractors apply? In...

  9. South African Private Security Contractors Active in Armed Conflicts ...

    African Journals Online (AJOL)

    Not only is this legislation completely unique, but it appears wholly at odds with international opinion. In this article we place private security contractors (PSCs) under the microscope of international law, exploring the role they play in armed conflicts, and the status afforded them by international humanitarian law (IHL).

  10. Building America Best Practices Series. Volume 17 - Energy Renovations-Insulation: A Guide for Contractors to Share With Homeowners

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Adams, K. T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hefty, M. G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gilbride, T. L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Love, Pat M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-05-01

    This guide will help contractors and homeowners identify ways to make their homes more comfortable, more energy efficient, and healthier to live in. It also identifies the steps to take, with the help of a qualified home performance contractor, to increase their home’s insulation, ensure healthy levels of ventilation, and prevent moisture problems. Contractors can use this document to explain the value of these insulation measures to their customers. The references in this document provide further explanation of insulation techniques and technologies.

  11. Future aerospace ground test facility requirements for the Arnold Engineering Development Center

    Science.gov (United States)

    Kirchner, Mark E.; Baron, Judson R.; Bogdonoff, Seymour M.; Carter, Donald I.; Couch, Lana M.; Fanning, Arthur E.; Heiser, William H.; Koff, Bernard L.; Melnik, Robert E.; Mercer, Stephen C.

    1992-01-01

    Arnold Engineering Development Center (AEDC) was conceived at the close of World War II, when major new developments in flight technology were presaged by new aerodynamic and propulsion concepts. During the past 40 years, AEDC has played a significant part in the development of many aerospace systems. The original plans were extended through the years by some additional facilities, particularly in the area of propulsion testing. AEDC now has undertaken development of a master plan in an attempt to project requirements and to plan for ground test and computational facilities over the coming 20 to 30 years. This report was prepared in response to an AEDC request that the National Research Council (NRC) assemble a committee to prepare guidance for planning and modernizing AEDC facilities for the development and testing of future classes of aerospace systems as envisaged by the U.S. Air Force.

  12. Testing of ground fault relay response during the energisation of megawatt range electric boilers in thermal power plants

    DEFF Research Database (Denmark)

    Silva, Filipe Miguel Faria da; Bak, Claus Leth; Davidsen, Troels

    2015-01-01

    , with the advantage that the warmed water can be reused in a thermal power plant or at regional heating, thus, minimising the overall losses. However, one problem was raised by those purchasing the boilers, mainly the possibility of an unwanted triggering of the protections relays, especially ground fault protection...... for the testing of two ground fault protection relays, in order to assure that they are not triggered by the energisation of the boiler. The test is performed via an OMICRON CMC 256 with Advanced TransPlay SW, which generates the signals that would be present at the secondary of the instrumentation transformers......, during the energisation of a boiler. A special case for concern was the presence of an electric arc between the electrodes of the boiler and the water in the boiler during approximately 2s at the energisation, which can in theory be seen as a ground fault by the relay. The voltage and current transient...

  13. A study on seismic behavior of pile foundations of bridge abutment on liquefiable ground through shaking table tests

    Science.gov (United States)

    Nakata, Mitsuhiko; Tanimoto, Shunsuke; Ishida, Shuichi; Ohsumi, Michio; Hoshikuma, Jun-ichi

    2017-10-01

    There is risk of bridge foundations to be damaged by liquefaction-induced lateral spreading of ground. Once bridge foundations have been damaged, it takes a lot of time for restoration. Therefore, it is important to assess the seismic behavior of the foundations on liquefiable ground appropriately. In this study, shaking table tests of models on a scale of 1/10 were conducted at the large scale shaking table in Public Works Research Institute, Japan, to investigate the seismic behavior of pile-supported bridge abutment on liquefiable ground. The shaking table tests were conducted for three types of model. Two are models of existing bridge which was built without design for liquefaction and the other is a model of bridge which was designed based on the current Japanese design specifications for highway bridges. As a result, the bending strains of piles of the abutment which were designed based on the current design specifications were less than those of the existing bridge.

  14. Contractors' Perception of factors Contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia

    Directory of Open Access Journals (Sweden)

    Azlan Shah Ali

    2010-12-01

    Full Text Available Delay in construction projects is a situation where the project cannot be completed under the planned time. It is a common issue faced in the construction industry all over the world especially in developing countries. In the Malaysian construction industry, 17.3% of construction projects experience more than 3 months delay and some of them are abandoned. Hence, the study of factors contributing to delay is very important in order to reduce the number of projects that experience delay in project delivery. Three objectives of the research have been formulated, namely (1 to identify factors that contribute to delay in construction projects; (2 to analyse and rank the causes of delay rated by contractors; and (3 to study the effects of delay in construction projects. One hundred questionnaires were distributed during data collection stage and only 36 responses received. The respondents only consist of contractors and sub-contractors because the scope of the research focuses on contractors' perception. The data collected was analysed using SPSS software. Seven factors that contribute to delay were identified through literature review, namely contractors' financial difficulties, construction mistakes and defective work, labour shortage, coordination problems, shortage of tools and equipment, material shortage and poor site management. Of those factors, the three most important factors were found to be labour shortage, contractors' financial difficulties and construction mistakes and defective works. Besides project delay, the research shows that cost overrun and extension of time (EOT are the most common effects of delay in construction projects.

  15. Radiation exposures for DOE and DOE contractor employees Eighteenth annual report, 1985

    International Nuclear Information System (INIS)

    1986-12-01

    All US Department of Energy (DOE) and DOE contractors are required to submit occupational radiation exposure records to a central repository. The data required include a summary of whole-body exposures to ionizing radiation, a summary of internal depositions of radioactive materials above specified limits, and occupational exposure reports for terminating employees. This report is a summary of the data submitted by DOE and DOE contractors for 1985. A total of 95,806 DOE and DOE contractor employees were monitored for whole-body ionizing radiation exposures in 1985. In addition to the employees, 96,665 visitors were monitored. Of all employees monitored, 58.4% received a dose equivalent that was less than measurable, 39.8% a measurable exposure less than 1 rem, and 1.9% an exposure greater than 1 rem. One employee received a dose equivalent greater than 5 rem (8.66 rem). The exposure received by 91.9% of the visitors to DOE facilities was less than measurable. No visitors received a dose equivalent greater than 2 rem. The collective dose equivalent for DOE and DOE contractor employees was 8223 person-rem. The collective dose equivalent for visitors was 461 person-rem. These averages are significantly less than the DOE 5-rem/year radiation protection standard for whole-body exposures. Ten new cases of internal depositions were reported in 1985 that exceeded 50% of the pertinent annual dose-equivalent standard. Of these ten cases, eight occurred in a previous year and are reported now because recent revisions in the dose calculations established these cases as reportable depositions. Twenty-six cases reported during 1985 were considered to be the continued tracking of previous depositions. 5 figs., 32 tabs

  16. Ground/Flight Test Techniques and Correlation.

    Science.gov (United States)

    1983-02-01

    dihedral. The photogrammetric analysis system developed at AEDC 6 uses 70-mm Hasselblad cameras and a Keffel & Esser DSC-3/80® analytical stereocompiler...model transmits data to a ground receiver by telemetry and is tracked by accurate radar scanners and/or kinetheodolite cameras as required. The required...Materials Panel Meeting, Ottawa/Canada Sept. 25-27, 1967; also Jahrbuch 1967 der Wissenschaftlichen Gesell - schaft fur Luft- und Raumfahrt, pp. 211

  17. Private Security Contractors in Iraq: Background, Legal Status, and Other Issues

    National Research Council Canada - National Science Library

    Elsea, Jennifer K; Serafino, Nina M

    2007-01-01

    .... From the information available in published sources, this apparently is the first time that the United States has depended on contractors to provide such extensive security in a hostile environment...

  18. 29 CFR 471.15 - Under what circumstances must a contractor be provided the opportunity for a hearing?

    Science.gov (United States)

    2010-07-01

    ...-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR... 29 Labor 2 2010-07-01 2010-07-01 false Under what circumstances must a contractor be provided the...

  19. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Science.gov (United States)

    2010-07-01

    ... treatment works owner, the applicant, its engineers, contractors, equipment manufacturers or suppliers; (b) The RBC failure has significantly increased the project's capital or operation and maintenance costs; (c) The modification/replacement project meets all requirements of EPA's construction grant and other...

  20. Concept study of a hydrogen containment process during nuclear thermal engine ground testing

    OpenAIRE

    Wang, Ten-See; Stewart, Eric T.; Canabal, Francisco

    2016-01-01

    A new hydrogen containment process was proposed for ground testing of a nuclear thermal engine. It utilizes two thermophysical steps to contain the hydrogen exhaust. First, the decomposition of hydrogen through oxygen-rich combustion at higher temperature; second, the recombination of remaining hydrogen with radicals at low temperature. This is achieved with two unit operations: an oxygen-rich burner and a tubular heat exchanger. A computational fluid dynamics methodology was used to analyze ...