WorldWideScience

Sample records for ground equipment age

  1. 30 CFR 75.811 - High-voltage underground equipment; grounding.

    Science.gov (United States)

    2010-07-01

    ...-voltage equipment supplying power to such equipment receiving power from resistance grounded systems shall... 30 Mineral Resources 1 2010-07-01 2010-07-01 false High-voltage underground equipment; grounding... COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Underground High-Voltage...

  2. Grounds Maintenance Equipment and Procedures. Building Maintenance. Module VI. Instructor's Guide.

    Science.gov (United States)

    Crank, Virgil

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for two units on grounds maintenance equipment and procedures. The first unit deals with grounds maintenance equipment and includes the following lessons: safety; changing oil/filter…

  3. 30 CFR 57.12027 - Grounding mobile equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Grounding mobile equipment. 57.12027 Section 57.12027 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Electricity...

  4. 30 CFR 56.12027 - Grounding mobile equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Grounding mobile equipment. 56.12027 Section 56.12027 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity § 56...

  5. Integration of Diagnostics into Ground Equipment Study. Volume 1

    National Research Council Canada - National Science Library

    Kumara, Soundar; Gautam, N; Hall, Dave; Purao, Sandeep; Garga, Amulya; Grimes, Barney

    2004-01-01

    ...) for Ground Equipment used by the U.S. Marine Corps. The study reviewed the sources of Autonomic Logistics data, the data requirements, the timeliness or required "pull" of such data, its transmission means...

  6. Modeled ground water age distributions

    Science.gov (United States)

    Woolfenden, Linda R.; Ginn, Timothy R.

    2009-01-01

    The age of ground water in any given sample is a distributed quantity representing distributed provenance (in space and time) of the water. Conventional analysis of tracers such as unstable isotopes or anthropogenic chemical species gives discrete or binary measures of the presence of water of a given age. Modeled ground water age distributions provide a continuous measure of contributions from different recharge sources to aquifers. A numerical solution of the ground water age equation of Ginn (1999) was tested both on a hypothetical simplified one-dimensional flow system and under real world conditions. Results from these simulations yield the first continuous distributions of ground water age using this model. Complete age distributions as a function of one and two space dimensions were obtained from both numerical experiments. Simulations in the test problem produced mean ages that were consistent with the expected value at the end of the model domain for all dispersivity values tested, although the mean ages for the two highest dispersivity values deviated slightly from the expected value. Mean ages in the dispersionless case also were consistent with the expected mean ages throughout the physical model domain. Simulations under real world conditions for three dispersivity values resulted in decreasing mean age with increasing dispersivity. This likely is a consequence of an edge effect. However, simulations for all three dispersivity values tested were mass balanced and stable demonstrating that the solution of the ground water age equation can provide estimates of water mass density distributions over age under real world conditions.

  7. Evaluation of high frequency ground motion effects on the seismic capacity of NPP equipments

    International Nuclear Information System (INIS)

    Choi, In Kil; Seo, Jeong Moon; Choun, Young Sun

    2003-04-01

    In this study, the uniform hazard spectrum for the example Korean nuclear power plants sites were developed and compared with various response spectra used in past seismic PRA and SMA. It shows that the high frequency ground motion effects should be considered in seismic safety evaluations. The floor response spectra were developed using the direct generation method that can develop the floor response spectra from the input response spectrum directly with only the dynamic properties of structures obtained from the design calculation. Most attachment of the equipments to the structure has a minimum distortion capacity. This makes it possible to drop the effective frequency of equipment to low frequency before it is severely damaged. The results of this study show that the high frequency ground motion effects on the floor response spectra were significant, and the effects should be considered in the SPRA and SMA for the equipments installed in a building. The high frequency ground motion effects are more important for the seismic capacity evaluation of functional failure modes. The high frequency ground motion effects on the structural failure of equipments that attached to the floor by welding can be reduced by the distortion capacity of welded anchorage

  8. Electric Ground Support Equipment at Airports

    Energy Technology Data Exchange (ETDEWEB)

    2017-12-12

    Airport ground support equipment (GSE) is used to service airplanes between flights. Services include refueling, towing airplanes or luggage/freight carts, loading luggage/freight, transporting passengers, loading potable water, removing sewage, loading food, de-icing airplanes, and fire-fighting. Deploying new GSE technologies is a promising opportunity in part because the purchasers are generally large, technologically sophisticated airlines, contractors, or airports with centralized procurement and maintenance departments. Airlines could particularly benefit from fuel diversification since they are highly exposed to petroleum price volatility. GSE can be particularly well-suited for electrification because it benefits from low-end torque and has frequent idle time and short required ranges.

  9. Constellation Program Electrical Ground Support Equipment Research and Development

    Science.gov (United States)

    McCoy, Keegan S.

    2010-01-01

    At the Kennedy Space Center, I engaged in the research and development of electrical ground support equipment for NASA's Constellation Program. Timing characteristics playa crucial role in ground support communications. Latency and jitter are two problems that must be understood so that communications are timely and consistent within the Kennedy Ground Control System (KGCS). I conducted latency and jitter tests using Alien-Bradley programmable logic controllers (PLCs) so that these two intrinsic network properties can be reduced. Time stamping and clock synchronization also play significant roles in launch processing and operations. Using RSLogix 5000 project files and Wireshark network protocol analyzing software, I verified master/slave PLC Ethernet module clock synchronization, master/slave IEEE 1588 communications, and time stamping capabilities. All of the timing and synchronization test results are useful in assessing the current KGCS operational level and determining improvements for the future.

  10. Problems associated with accelerated thermal aging of electrical equipment

    International Nuclear Information System (INIS)

    Isgro, J.R.

    1984-01-01

    This paper discusses the potential problems that may be experienced when accounting for aging mechanisms in organic polymers when utilizing accelerated thermal aging techniques for electrical equipment qualification. Included are discussions of actual experiences and problems encountered in the qualification of electrical and electronic equipment for a complete nuclear power plant. The wide variety of approaches to thermal accelerated aging by various manufacturers of diverse equipment types provides depth to the discussion. A description of how to account for aging mechanisms is also presented

  11. Solar Constant (SOLCON) Experiment: Ground Support Equipment (GSE) software development

    Science.gov (United States)

    Gibson, M. Alan; Thomas, Susan; Wilson, Robert

    1991-01-01

    The Solar Constant (SOLCON) Experiment, the objective of which is to determine the solar constant value and its variability, is scheduled for launch as part of the Space Shuttle/Atmospheric Laboratory for Application and Science (ATLAS) spacelab mission. The Ground Support Equipment (GSE) software was developed to monitor and analyze the SOLCON telemetry data during flight and to test the instrument on the ground. The design and development of the GSE software are discussed. The SOLCON instrument was tested during Davos International Solar Intercomparison, 1989 and the SOLCON data collected during the tests are analyzed to study the behavior of the instrument.

  12. Assessment of electrical equipment aging for nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    The electrical and instrumentation equipments, especially whose parts are made of polymer material, are gradually degraded by thermal and radiation environment in the normal operation, and the degradation is thought to progress rapidly when they are exposed to the environment of the design basis event (DBE). The integrity of the equipments is evaluated by the environmental qualification (EQ) test simulating the environment of the normal operation and the DBE. The project of 'Assessment of Cable Aging for Nuclear Power Plants' (ACA, 2002-2008) indicated the importance of applying simultaneous thermal and radiation aging for simulating the aging in normal operation. The project of 'Assessment of Electrical Equipment Aging for Nuclear Power Plants' (AEA) was initiated in FY2008 to apply the outcome of ACA to the other electrical and instrumentation equipment and to establish an advanced EQ test method that can appropriately simulate the environment in actual plants. In FY2012, aging characteristics of thermal aging and simultaneous aging were obtained for the epoxy resin of electrical penetrations and the O-ring of connectors. Physical property measurement was carried out for epoxy resin of electrical penetration subject to the type testing in FY2010. (author)

  13. Assessment of electrical equipment aging for nuclear power plant

    International Nuclear Information System (INIS)

    2013-01-01

    The electrical and instrumentation equipments, especially whose parts are made of polymer material, are gradually degraded by thermal and radiation environment in the normal operation, and the degradation is thought to progress rapidly when they are exposed to the environment of the design basis event (DBE). The integrity of the equipments is evaluated by the environmental qualification (EQ) test simulating the environment of the normal operation and the DBE. The project of 'Assessment of Cable Aging for Nuclear Power Plants' (ACA, 2002-2008) indicated the importance of applying simultaneous thermal and radiation aging for simulating the aging in normal operation. The project of 'Assessment of Electrical Equipment Aging for Nuclear Power Plants' (AEA) was initiated in FY2008 to apply the outcome of ACA to the other electrical and instrumentation equipment and to establish an advanced EQ test method that can appropriately simulate the environment in actual plants. In FY2012, aging characteristics of thermal aging and simultaneous aging were obtained for the epoxy resin of electrical penetrations and the O-ring of connectors. Physical property measurement was carried out for epoxy resin of electrical penetration subject to the type testing in FY2010. (author)

  14. Equipment aging: an overview of status and research needs

    International Nuclear Information System (INIS)

    Carfagno, S.P.

    1982-01-01

    The problem of equipment aging in nuclear power generating stations is viewed from the standpoint of the qualification of safety-related equipment. A brief summary of developments related to equipment aging and qualification (in industry, the regulatory arena, and in the research area) is presented to focus on the current status of the problem. Several research topics are suggested for consideration as components of any general plan of research on plant aging. Among these is a topic concerned with an effort to establish the relative merit of different approaches to account for the functional degradation of equipment in terms of their cost and their contribution to assurance of public safety and a topic to investigate ways to improve the monitoring of functional degradation of equipment in service. Some factors to be considered in choosing among research topics and in establishing funding levels are mentioned

  15. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Science.gov (United States)

    2010-07-01

    ... portable or mobile equipment from low-voltage three-phase resistance grounded power systems shall contain... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables supplying power to low-voltage... STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Low- and Medium-Voltage...

  16. Electronic ground support equipment for the Cluster Electric Field and Wave Experiment

    International Nuclear Information System (INIS)

    Sten, T.A.

    1992-10-01

    In a collaboration between ESA and NASA, ionosphere plasma structures will be studied by four indentical space probes to be launched in 1995 from French Guiana. The Electric Field and Wave (EFW) experiment will be designed to measure electric field and density fluctations by means of four sensors, each deployed on a 50 meter wire boom. In order to perform comprehensive tests and calibrations of the EFW experiment, computer controlled electronic ground support equipment has been developed. This report describes the hardware of the equipment, produced and assembled at the University of Oslo. 15 figs

  17. Recommendations for managing equipment aging in nuclear power plants

    International Nuclear Information System (INIS)

    Gunther, W.E.; Subudhi, M.; Aggarwal, S.K.

    1992-01-01

    Research conducted under the auspices of the US NRC's Nuclear Plant Aging Research (NPAR) Program has resulted in a large database of component and system operating, maintenance, and testing information. This database has been used to determine the susceptibility to aging of selected components, and the potential for equipment aging to impact plant safety and availability. it has also identified methods for detecting and mitigating component and system aging. This paper describes the research recommendations on electrical components which could be applied to maintenance, testing, and inspection activities to detect and mitigate the effects of aging prior to equipment failures

  18. Review of equipment aging theory and technology. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Carfagno, S.P.; Gibson, R.J.

    1980-09-01

    The theory and technology of equipment aging is reviewed, particularly as they relate to the qualification of safety-system equipment for nuclear power generating stations. A fundamental degradation model is developed, and its relation to more restricted models (e.g., Arrhenius and inverse-stress models) is shown. The most common theoretical and empirical models of aging are introduced, and limitations on their practical application are analyzed. Reliability theory and its application to the acceleration of aging are also discussed. A compendium of aging data for materials and components, including degradation mechanisms, failure modes and activation energies, is included.

  19. Review of equipment aging theory and technology. Final report

    International Nuclear Information System (INIS)

    Carfagno, S.P.; Gibson, R.J.

    1980-09-01

    The theory and technology of equipment aging is reviewed, particularly as they relate to the qualification of safety-system equipment for nuclear power generating stations. A fundamental degradation model is developed, and its relation to more restricted models (e.g., Arrhenius and inverse-stress models) is shown. The most common theoretical and empirical models of aging are introduced, and limitations on their practical application are analyzed. Reliability theory and its application to the acceleration of aging are also discussed. A compendium of aging data for materials and components, including degradation mechanisms, failure modes and activation energies, is included

  20. Qualification of Electrical Equipment in Nuclear Power Plants - Management of ageing

    International Nuclear Information System (INIS)

    Spaang, Kjell; Staahl, Gunnar

    2013-02-01

    The purpose of this report is to describe programs and tools for assessment of accomplished and documented qualification with respect to ageing of electrical equipment and for development of complimentary ageing management programs. In addition to description of complete programs for management of ageing, tools for validation of the status with regard to ageing of installed ('old') equipment and, where needed, for complementation of their qualification are also included. The report is restricted to safety related equipment containing ageing sensitive parts, mainly organic materials. To this category belong cables and cable joints and a number of equipment containing oils, seals (o-rings), etc. For equipment located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. The main part of this report deals with the qualification of such equipment. Some safety related equipment outside the containment can be located in areas where they are subjected to high temperature and other excessive environmental stresses during normal operation and in areas affected by an accident. Therefore, some material is given also on qualification of equipment located outside containment with better possibilities for frequent inspection and supervision. Part 1 of the report is an executive summary with a general review of the methodologies and their application. The more detailed description of the programs and underlying material, useful data, etc. is given in Part 2

  1. SLOPE STABILITY EVALUATION AND EQUIPMENT SETBACK DISTANCES FOR BURIAL GROUND EXCAVATIONS

    Energy Technology Data Exchange (ETDEWEB)

    MCSHANE DS

    2010-03-25

    After 1970 Transuranic (TRU) and suspect TRU waste was buried in the ground with the intention that at some later date the waste would be retrieved and processed into a configuration for long term storage. To retrieve this waste the soil must be removed (excavated). Sloping the bank of the excavation is the method used to keep the excavation from collapsing and to provide protection for workers retrieving the waste. The purpose of this paper is to document the minimum distance (setback) that equipment must stay from the edge of the excavation to maintain a stable slope. This evaluation examines the equipment setback distance by dividing the equipment into two categories, (1) equipment used for excavation and (2) equipment used for retrieval. The section on excavation equipment will also discuss techniques used for excavation including the process of benching. Calculations 122633-C-004, 'Slope Stability Analysis' (Attachment A), and 300013-C-001, 'Crane Stability Analysis' (Attachment B), have been prepared to support this evaluation. As shown in the calculations the soil has the following properties: Unit weight 110 pounds per cubic foot; and Friction Angle (natural angle of repose) 38{sup o} or 1.28 horizontal to 1 vertical. Setback distances are measured from the top edge of the slope to the wheels/tracks of the vehicles and heavy equipment being utilized. The computer program utilized in the calculation uses the center of the wheel or track load for the analysis and this difference is accounted for in this evaluation.

  2. Slope Stability Evaluation And Equipment Setback Distances For Burial Ground Excavations

    International Nuclear Information System (INIS)

    Mcshane, D.S.

    2010-01-01

    After 1970 Transuranic (TRU) and suspect TRU waste was buried in the ground with the intention that at some later date the waste would be retrieved and processed into a configuration for long term storage. To retrieve this waste the soil must be removed (excavated). Sloping the bank of the excavation is the method used to keep the excavation from collapsing and to provide protection for workers retrieving the waste. The purpose of this paper is to document the minimum distance (setback) that equipment must stay from the edge of the excavation to maintain a stable slope. This evaluation examines the equipment setback distance by dividing the equipment into two categories, (1) equipment used for excavation and (2) equipment used for retrieval. The section on excavation equipment will also discuss techniques used for excavation including the process of benching. Calculations 122633-C-004, 'Slope Stability Analysis' (Attachment A), and 300013-C-001, 'Crane Stability Analysis' (Attachment B), have been prepared to support this evaluation. As shown in the calculations the soil has the following properties: Unit weight 110 pounds per cubic foot; and Friction Angle (natural angle of repose) 38 o or 1.28 horizontal to 1 vertical. Setback distances are measured from the top edge of the slope to the wheels/tracks of the vehicles and heavy equipment being utilized. The computer program utilized in the calculation uses the center of the wheel or track load for the analysis and this difference is accounted for in this evaluation.

  3. Virtual age model for equipment aging plant based on operation environment and service state

    International Nuclear Information System (INIS)

    Zhang Liming; Cai Qi; Zhao Xinwen; Chen Ling

    2010-01-01

    The accelerated life model based on the operation environment and service state was established by taking the virtual age as the equipment aging indices. The effect of different operation environments and service states on the reliability and virtual age under the continuum operation conditions and cycle operation conditions were analyzed, and the sensitivities of virtual age on operational environments and service states were studied. The results of the example application show that the effect of NPP equipment lifetime and the key parameters related to the reliability can be quantified by this model, and the result is in accordance with the reality.(authors)

  4. Developing a Logistics Data Process for Support Equipment for NASA Ground Operations

    Science.gov (United States)

    Chakrabarti, Suman

    2010-01-01

    The United States NASA Space Shuttle has long been considered an extremely capable yet relatively expensive rocket. A great part of the roughly US $500 million per launch expense was the support footprint: refurbishment and maintenance of the space shuttle system, together with the long list of resources required to support it, including personnel, tools, facilities, transport and support equipment. NASA determined to make its next rocket system with a smaller logistics footprint, and thereby more cost-effective and quicker turnaround. The logical solution was to adopt a standard Logistics Support Analysis (LSA) process based on GEIA-STD-0007 http://www.logisticsengineers.org/may09pres/GEIASTD0007DEXShortIntro.pdf which is the successor of MIL-STD-1388-2B widely used by U.S., NATO, and other world military services and industries. This approach is unprecedented at NASA: it is the first time a major program of programs, Project Constellation, is factoring logistics and supportability into design at many levels. This paper will focus on one of those levels NASA ground support equipment for the next generation of NASA rockets and on building a Logistics Support Analysis Record (LSAR) for developing and documenting a support solution and inventory of resources for. This LSAR is actually a standards-based database, containing analyses of the time and tools, personnel, facilities and support equipment required to assemble and integrate the stages and umbilicals of a rocket. This paper will cover building this database from scratch: including creating and importing a hierarchical bill of materials (BOM) from legacy data; identifying line-replaceable units (LRUs) of a given piece of equipment; analyzing reliability and maintainability of said LRUs; and therefore making an assessment back to design whether the support solution for a piece of equipment is too much work, i.e., too resource-intensive. If one must replace or inspect an LRU too much, perhaps a modification of

  5. Determining optimum aging time using novel core flooding equipment

    DEFF Research Database (Denmark)

    Ahkami, Mehrdad; Chakravarty, Krishna Hara; Xiarchos, Ioannis

    2016-01-01

    the optimum aging time regardless of variations in crude oil, rock, and brine properties. State of the art core flooding equipment has been developed that can be used for consistently determining the resistivity of the coreplug during aging and waterflooding using advanced data acquisition software......New methods for enhanced oil recovery are typically developed using core flooding techniques. Establishing reservoir conditions is essential before the experimental campaign commences. The realistic oil-rock wettability can be obtained through optimum aging of the core. Aging time is affected....... In the proposed equipment, independent axial and sleeve pressure can be applied to mimic stresses at reservoir conditions. 10 coreplugs (four sandstones and six chalk samples) from the North Sea have been aged for more than 408 days in total and more than 29000 resistivity data points have been measured...

  6. Application of quality assurance program to safety related aging equipment or components

    International Nuclear Information System (INIS)

    Papaiya, N.C.

    1990-01-01

    This paper addresses how quality assurance programs and their criteria are applied to safety related and aging equipment or components used in commercial nuclear plant applications. The QA Programs referred to are 10CFR50 Appendix B and EPRI NP-5652. The QA programs as applicable are applied to equipment/component aging qualification, preventive maintenance, surveillance testing and procurement engineering. The intent of this paper is not the technical issues, methods and research of aging. The paper addresses QA program's application to age-related equipment or components in safety related applications. Quality Assurance Program 10CFR50 Appendix B applies to all safety related aging components or equipment related to the qualification program and associated preventive maintenance and surveillance testing programs. Quality Assurance involvement with procurement engineering for age-related commercial grade items supports EPRI NP-5652 and assures that the dedicated OGI is equal to the item purchased as a basic component to 10CFR50 Appendix B requirements

  7. Research on U.S. nuclear power plant major equipment aging

    International Nuclear Information System (INIS)

    Nakos, J.T.; Rosinski, S.T.

    1994-01-01

    The U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), in cooperation with nuclear power plant utilities and the Nuclear Energy Institute, have prepared equipment aging evaluations of nuclear power plant equipment for life extension considerations. Specifically, these evaluations focused on equipment considered important for plant license renewal (U.S. Code of Federal Regulations 10CFR54). open-quotes Industry Reportsclose quotes (IRs), jointly funded by DOE and EPRI, evaluated the aging of major systems, structures, and components (e.g., reactor pressure vessels, Class I structures, PWR and BWR containments, etc.) and contain a mixture of technical and licensing information. open-quotes Aging Management Guidelinesclose quotes (AMGs), funded by DOE, evaluate aging for commodity types of equipment (e.g., pumps, electrical switchgear, heat exchangers, etc.) and concentrate on technical issues only. AMGs are intended for systems engineers and plant maintenance staff. A significant number of technical issues were resolved during IR interactions with the U.S. Nuclear Regulatory Commission (NRC). However, certain technical issues have not been resolved and are considered open-quotes openclose quotes. Examples include certain issues related to fatigue, neutron irradiation embrittlement, intergranular stress corrosion cracking (IGSCC) and electrical cable equipment qualification. Direct NRC interaction did not take place during preparation of individual AMGs due to their purely technical nature. The eventual use of AMGs in a future license renewal application will likely require NRC interaction at that time. With a few noted exceptions, the AMG process indicated that current aging management practices of U.S. utilities were effective in preventing age-related degradation. This paper briefly describes the IR and AMG processes and summarizes the unresolved technical issues identified through preparation of the documents

  8. Aircraft interrogation and display system: A ground support equipment for digital flight systems

    Science.gov (United States)

    Glover, R. D.

    1982-01-01

    A microprocessor-based general purpose ground support equipment for electronic systems was developed. The hardware and software are designed to permit diverse applications in support of aircraft flight systems and simulation facilities. The implementation of the hardware, the structure of the software, describes the application of the system to an ongoing research aircraft project are described.

  9. Kennedy Space Center: Constellation Program Electrical Ground Support Equipment Research and Development

    Science.gov (United States)

    McCoy, Keegan

    2010-01-01

    The Kennedy Space Center (KSC) is NASA's spaceport, launching rockets into space and leading important human spaceflight research. This spring semester, I worked at KSC on Constellation Program electrical ground support equipment through NASA's Undergraduate Student Research Program (USRP). This report includes a discussion of NASA, KSC, and my individual research project. An analysis of Penn State's preparation of me for an internship and my overall impressions of the Penn State and NASA internship experience conclude the report.

  10. Ageing of polymers in electrical equipment used in nuclear power plants

    International Nuclear Information System (INIS)

    Clavreul, R.

    1999-01-01

    Ageing of polymers in electrical equipment used in nuclear power plants has been studied in (Electricite de France) EDF for several years. The objective of such studies is to predict the polymers lifetime in normal and accidental conditions. The prediction of polymers behaviour in normal conditions requires accelerated tests in order to get rapidly experimental results. Experimental conditions must carefully be chosen and representative of real ageing. Accelerated ageing is usually done by applying higher temperature, (dose) or dose rate. When such experiments are done, the effects of temperature, (dose) or dose rate are first determined. In a second step, experimental results are extrapolated to real conditions. To predict lifetime of polymers, the following recommendations have to be checked: in order to assume that accelerated tests are representative of normal ageing, the observed mechanisms in experiments must be the same as those in real conditions. For accidental conditions, the same tests as those described in standards can be applied to polymers. The simulation of any accident occurring just after the installation of electrical equipment in nuclear power plants is easy to manage: only the accidental test can be carried out on the electrical equipment. To determine whether polymers in electrical equipment would have a good behaviour or not when an accident would occur after a period of several years or decades in normal conditions in a nuclear power plant, the accidental test must be done on aged materials; their physical, mechanical and electrical characteristics must be relevant to aged polymers in normal conditions. In order to detect any evolution of properties during ageing, the electrical, mechanical or chemical tests have to be proceeded on polymers samples. The characterisation tests which are applied on non-aged and aged samples depend on the nature of the polymers, their application in electrical equipment and their environment. The IEC 544

  11. Operation modes research of liquefied natural gas storages as a part of the ground complexes equipment

    Directory of Open Access Journals (Sweden)

    N. S. Korolev

    2014-01-01

    Full Text Available The use of the Liquefied Natural Gas (LNG in the space-rocket equipment is motivated by some advantages. That is why a lot of tests and works are actively carried out now on rocket engines using liquefied natural gas.To provide the engine tests and subsequent rocket complex operation a creation of LNG storages is demanded as a part of ground processing equipment and support for their safe operation conditions.One of LNG danger factor is its low boiling temperature, and also changing the condition, density and LNG boiling temperature at storage due to evaporation of light component, namely methane. At refill of the storages having fuel remains with a new LNG portion these factors can lead to formation of the stratified macro-layers and cause a mode of the intensive mixing that is called "rollover", with almost instant evaporation of LNG big mass and sharp pressure boost, capable to result in the storage distraction with catastrophic effects.The work objectives are formulated such as a technique development for forecasting of the LNG parameters in operating storages including the rollover mode, a comparison of calculated results of the LNG parameters with the experimental data, and a definition of possible recommendations for safe operation of LNG storages as a part of the ground complexes equipment.The paper reviews 12 publications concerning the issues and proceeding processes at operation of LNG storages, including the rollover mode.To verify the reliability of process simulation results in the LNG, represented in models by the binary methane-ethane mixture the calculated values have been compared with the experimental data for a LNG storage mode in the reservoir of a ground test complex.The reliability of developed models of the heat-mass-exchange processes in stratified on density and temperature in LNG storage with emergence of conditions for the rollover mode has been verified by comparing the settlement characteristics to the published

  12. Military Handbook. Grounding, Bonding, and Shielding for Electronic Equipments and Facilities. Volume 1. Basic Theory

    Science.gov (United States)

    1987-12-29

    when the air or gas stream contains particulate matter. b. Pulverized materials passing through chutes or pneumatic conveyors . c. Nonconductive power...Hanover NH, 1971, AD 722 221. 146.Oakley, R.J., "Surface Transfer Impedance and Cable Shielding Design ," Wire Journal, Vol 4, No. 3, March 1971, pp...including considerations of grounding, bonding, and shielding in all phases of design , construction, operation, and maintenance of electronic equipment

  13. Figure ground discrimination in age-related macular degeneration.

    Science.gov (United States)

    Tran, Thi Ha Chau; Guyader, Nathalie; Guerin, Anne; Despretz, Pascal; Boucart, Muriel

    2011-03-01

    To investigate impairment in discriminating a figure from its background and to study its relation to visual acuity and lesion size in patients with neovascular age-related macular degeneration (AMD). Seventeen patients with neovascular AMD and visual acuity Figure/ground segregation is impaired in patients with AMD. A white space surrounding an object is sufficient to improve the object's detection and to facilitate figure/ground segregation. These results may have practical applications to the rehabilitation of the environment in patients with AMD.

  14. Equipment and building structures ageing management for WWER type NPPs

    International Nuclear Information System (INIS)

    Mayboroda, O.

    2001-01-01

    This report presents the working group 'Equipment and building structures ageing management for WWER type NPPs' activities. The analysis of experience in ageing management, recommendations for regulatory guidelines on ageing management, investigation of case studies, definition suitable communication channels among regulators for ageing related data are given. Analyses of water chemistry, inspection data (safety margins criteria), plugging criteria, volume and time of ECT implementation in all WWER countries are presented. The results of Working group activity show that it is advisable to concentrate efforts on: set up the permanent communication channel among regulators, collection of regulatory criteria for WWER type NPP key components based on understanding of ageing mechanisms and data collection

  15. Ageing of insulation and diagnosis of electrical equipment through detection of partial discharge

    International Nuclear Information System (INIS)

    Lopez Vergara, T.; Velasco Bernal, C.

    1994-01-01

    Ageing in electrical equipment affects mainly its insulation system. Such ageing in the insulation system is determined by its organic nature, basically constituted by three families of materials: cellulose, resin and hydrocarbon. All of these are affected by high temperatures, which tend to produce a break in the molecular chains (if the temperatures are not too high) or carbonization and gasification of the material (if they are). The radiation absorbed by the insulating materials also destroys molecular chains, causing degradation of the material. The break of the molecular chains, especially in the polymer-based materials, fragments the material, mainly in areas subjected to mechanical forces and stresses. From the electrical point of view, fissures occurring the insulating material lead to a much lower dielectric strength in certain parts of the materials, which could produce partial discharge conditions. Therefore, the growth of partial discharges in electrical equipment items is frequently the consequences of ageing, and be used to evaluate their residual life. Empresarios Agrupados has developed a system to detect partial discharges which can be used while equipment is still in operation. The measurements taken with this system are sufficiently accurate and repetitive to be used in evaluating the condition of medium-voltage electrical equipment insulation. (Author)

  16. Development of KSC program for investigating and generating field failure rates. Reliability handbook for ground support equipment

    Science.gov (United States)

    Bloomquist, C. E.; Kallmeyer, R. H.

    1972-01-01

    Field failure rates and confidence factors are presented for 88 identifiable components of the ground support equipment at the John F. Kennedy Space Center. For most of these, supplementary information regarding failure mode and cause is tabulated. Complete reliability assessments are included for three systems, eight subsystems, and nine generic piece-part classifications. Procedures for updating or augmenting the reliability results are also included.

  17. INERTIAL TECHNOLOGIES IN SYSTEMS FOR STABILIZATION OF GROUND VEHICLES EQUIPMENT

    Directory of Open Access Journals (Sweden)

    Olha Sushchenko

    2016-12-01

    Full Text Available Purpose: The vibratory inertial technology is a recent modern inertial technology. It represents the most perspective approach to design of inertial sensors, which can be used in stabilization and tracking systems operated on vehicles of the wide class. The purpose of the research is to consider advantages of this technology in comparison with laser and fiber-optic ones. Operation of the inertial sensors on the ground vehicles requires some improvement of the Coriolis vibratory gyroscope with the goal to simplify information processing, increase reliability, and compensate bias. Methods: Improvement of the Coriolis vibratory gyroscope includes introducing of the phase detector and additional excitation unit. The possibility to use the improved Coriolis vibratory gyroscope in the stabilization systems operated on the ground vehicles is shown by means of analysis of gyroscope output signal. To prove efficiency of the Coriolis vibratory gyroscope in stabilization system the simulation technique is used. Results: The scheme of the improved Coriolis vibratory gyroscope including the phase detector and additional excitation unit is developed and analyzed. The way to compensate bias is determined. Simulation of the stabilization system with the improved Coriolis vibratory gyroscope is carried out. Expressions for the output signals of the improved Coriolis vibratory gyroscope are derived. The error of the output signal is estimated and the possibility to use the modified Coriolis vibratory gyroscope in stabilization systems is proved. The results of stabilization system simulation are given. Their analysis is carried out. Conclusions: The represented results prove efficiency of the proposed technical decisions. They can be useful for design of stabilization platform with instrumental equipment operated on moving vehicles of the wide class.

  18. Park Planning for Ageing Adults Using Grounded Theory Methodology

    Directory of Open Access Journals (Sweden)

    Bernie Dahl

    2004-06-01

    Full Text Available The importance of understanding park planning issues and implementing planning strategies for ageing adults was the driving force for this study. Literature reviews have identified a variety of scholarly work from fields such as gerontology, psychology, sociology and economics, all of which provide valuable information regarding the special needs of ageing adults. Very few researchers, however, have investigated the leisure behaviours of older adults in outdoor recreation (Croskeys, Tinsley and Tinsley, 2002 and the use of grounded theory methodology has essentially been unexplored in this area. Ageing adults are projected to live more than 20 percent of their life in retirement (MRP, 1998, cited in Croskeys, Tinsley and Tinsley, 2002, allowing for an increased amount of discretionary time. This offers opportunities for ageing adults to participate in outdoor recreational activities and will undoubtedly increase their leisure time. However, with limited research in recreational needs and inclusion for older adults, it is difficult for park planners and administrators to meet the growing needs of this population. Therefore, this research is necessary in order to determine whether ageing adults are being accounted for in park and outdoor recreational planning. The objective of this study was to use grounded theory research methodology to identify and examine ageing adult needs in relation to outdoor leisure activities in a regional park setting. Ten Midwestern regional park visitors (aged 65-75 years old and four park employees were interviewed. Our research attempts to fill in the gaps between the perceptions of ageing park users and those of park planners, using a methodology that relies primarily on direct contact with park visitors.

  19. Shuttle Ground Support Equipment (GSE) T-0 Umbilical to Space Shuttle Program (SSP) Flight Elements Consultation

    Science.gov (United States)

    Wilson, Timmy R.; Kichak, Robert A.; McManamen, John P.; Kramer-White, Julie; Raju, Ivatury S.; Beil, Robert J.; Weeks, John F.; Elliott, Kenny B.

    2009-01-01

    The NASA Engineering and Safety Center (NESC) was tasked with assessing the validity of an alternate opinion that surfaced during the investigation of recurrent failures at the Space Shuttle T-0 umbilical interface. The most visible problem occurred during the Space Transportation System (STS)-112 launch when pyrotechnics used to separate Solid Rocket Booster (SRB) Hold-Down Post (HDP) frangible nuts failed to fire. Subsequent investigations recommended several improvements to the Ground Support Equipment (GSE) and processing changes were implemented, including replacement of ground-half cables and connectors between flights, along with wiring modifications to make critical circuits quad-redundant across the interface. The alternate opinions maintained that insufficient data existed to exonerate the design, that additional data needed to be gathered under launch conditions, and that the interface should be further modified to ensure additional margin existed to preclude failure. The results of the assessment are contained in this report.

  20. Grounding of SNS Accelerator Structure

    CERN Document Server

    Holik, Paul S

    2005-01-01

    Description of site general grounding network. RF grounding network enhancement underneath the klystron gallery building. Grounding network of the Ring Systems with ground breaks in the Ring Tunnel. Grounding and Bonding of R&D accelerator equipment. SNS Building lightning protection.

  1. Use of REMPI-TOFMS for real-time measurement of trace aromatics during operation of aircraft ground equipment

    Science.gov (United States)

    Gullett, Brian; Touati, Abderrahmane; Oudejans, Lukas

    Emissions of aromatic air toxics from aircraft ground equipment (AGE) were measured with a resonance enhanced multiphoton ionization-time of flight mass spectrometry (REMPI-TOFMS) system consisting of a pulsed solid state laser for photoionization and a TOFMS for mass discrimination. This instrument was capable of characterizing turbine emissions and the effect of varying load operations on pollutant production. REMPI-TOFMS is capable of high selectivity and low detection limits (part per trillion to part per billion) in real time (1 s resolution). Hazardous air pollutants and criteria pollutants were measured during startups and idle and full load operations. Measurements of compounds such as benzene, toluene, ethylbenzene, xylenes, styrene, and polycyclic aromatic hydrocarbons compared well with standard methods. Startup emissions from the AGE data showed persistent concentrations of pollutants, unlike those from a diesel generator, where a sharp spike in emissions rapidly declined to steady state levels. The time-resolved responses of air toxics concentrations varied significantly by source, complicating efforts to minimize these emissions with common operating prescriptions. The time-resolved measurements showed that pollutant concentrations decline (up to 5×) in a species-specific manner over the course of multiple hours of operation, complicating determination of accurate and precise emission factors via standard extractive sampling. Correlations of air toxic concentrations with more commonly measured pollutants such as CO or PM were poor due to the relatively greater changes in the measured toxics' concentrations.

  2. Ground reaction forces and kinematics in distance running in older-aged men

    NARCIS (Netherlands)

    Bus, Sicco A.

    2003-01-01

    Purpose: The biomechanics of distance running has not been studied before in older-aged runners but may be different than in younger-aged runners because of musculoskeletal degeneration at older age. This study aimed at determining whether the stance phase kinematics and ground reaction forces in

  3. Age determination of ground-waters by means of carbon 14

    International Nuclear Information System (INIS)

    Eichinger, L.

    1982-02-01

    At present the age determination of ground-waters aged between 1,500 and approximately 40,000 years is only possible by measuring their 14 C content. A precise age assignment can be established in slightly mineralised waters, whereas it becomes vague in mineralised waters, particularly in acidulous springs. In general, additional information and data are required about the 13 C, D, 18 O, 3 H, 85 Kr and the 39 Ar contents, about the ph value, temperature and the principal ions. (DG) [de

  4. The Effects of Aging on the Costs of Operating and Maintaining Military Equipment

    National Research Council Canada - National Science Library

    Kiley, Gregory

    2001-01-01

    .... According to one interpretation, decisions in the 199Os to reduce purchases of new equipment left the military with aging fleets of ships, aircraft, and armored vehicles that are increasingly expensive to maintain...

  5. An on-line monitoring system for navigation equipment

    Science.gov (United States)

    Wang, Bo; Yang, Ping; Liu, Jing; Yang, Zhengbo; Liang, Fei

    2017-10-01

    Civil air navigation equipment is the most important infrastructure of Civil Aviation, which is closely related to flight safety. In addition to regular flight inspection, navigation equipment's patrol measuring, maintenance measuring, running measuring under special weather conditions are the important means of ensuring aviation flight safety. According to the safety maintenance requirements of Civil Aviation Air Traffic Control navigation equipment, this paper developed one on-line monitoring system with independent intellectual property rights for navigation equipment, the system breakthroughs the key technologies of measuring navigation equipment on-line including Instrument Landing System (ILS) and VHF Omni-directional Range (VOR), which also meets the requirements of navigation equipment ground measurement set by the ICAO DOC 8071, it provides technical means of the ground on-line measurement for navigation equipment, improves the safety of navigation equipment operation, and reduces the impact of measuring navigation equipment on airport operation.

  6. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  7. Research of grounding capacitive current of neutral non-grounding auxiliary system in nuclear power plants

    International Nuclear Information System (INIS)

    Yang Shan; Liu Li; Huang Xiaojing

    2014-01-01

    In the domestic and abroad standards, the grounding capacitive current limitation in the non-grounding electric auxiliary system is less than 10 A. Limiting capacitive current in the standard aims to speed up the arc extinguishing to reduce the duration of arc over-voltage, but not to prevent the arc producing, The arc over-voltage harm is related to the multiple, frequency and duration of the over-voltage. When the insulation vulnerabilities appear in the equipment, the arc over-voltage may result in insulation vulnerabilities of the electrical equipment breakdown, which leads to multiple, short-circuit accidents. The cable connector, accessory and electromotor winding are all insulation vulnerabilities. Setting the arc suppression coil which can counteract the grounding capacitive current makes the arc vanish quickly. Using the casting bus which remarkably reduces the ground capacitance of the electric transmission line makes the equipment safer. (authors)

  8. The ground support equipment for the LAUE project

    Science.gov (United States)

    Caroli, E.; Auricchio, N.; Basili, A.; Carassiti, V.; Cassese, F.; Del Sordo, S.; Frontera, F.; Pecora, M.; Recanatesi, L.; Schiavone, F.; Silvestri, S.; Squerzanti, S.; Stephen, J. B.; Virgilli, E.

    2013-09-01

    The development of wide band Laue lens imaging technology is challenging, but has important potential applications in hard X- and γ-ray space instrumentation for the coming decades. The Italian Space Agency has funded a project dedicated to the development of a reliable technology to assemble a wide band Laue lens for use in space. The ground support equipment (GSE) for this project was fundamental to its eventual success... The GSE was implemented in a hard X-ray beam line built at the University of Ferrara and had the main purpose of controlling the assembly of crystals onto the Laue lens petal and to verify its final performance. The GSE incorporates the management and control of all the movements of the beam line mechanical subsystems and of the precision positioner (based on a Hexapod tool) of crystals on the petal, as well as the acquisition, storing and analysis of data obtained from the focal plane detectors (an HPGe spectrometer and an X-ray flat panel imager). The GSE is based on two PC's connected through a local network: one, placed inside the beam line, to which all the movement subsystems and the detector I/O interface and on which all the management and acquisition S/W runs, the other in the control room allows the remote control and implements the offline analysis S/W of the data obtained from the detectors. Herein we report on the GSE structure with its interface with the beam line mechanical system, with the fine crystal positioner and with the focal plane detector. Furthermore we describe the SW developed for the handling of the mechanical movement subsystems and for the analysis of the detector data with the procedure adopted for the correct orientation of the crystals before their bonding on the lens petal support.

  9. Aging management guidelines for commercial nuclear power plant equipment

    International Nuclear Information System (INIS)

    Nakos, J.T.; Gazdzinski, R.F.; Toman, G.J.

    1994-01-01

    The US Department of Energy, in cooperation with the Electric Power Research Institute and nuclear power plant utilities, has prepared ''Aging Management Guidelines'' (AMGs) for commodity types of equipment (e.g., pumps, electrical switchgear) important to license renewal. For the most part, this is also consistent with the Maintenance Rule, 10 CFR 50.65 (1991). AMGs concentrate on technical, (not licensing) issues and are directed toward systems engineers and plant maintenance staff. AMGs include a detailed summary of operating history, stressors, aging mechanisms, and various types of maintenance practices that can be combined to create effective programs that manage aging. All aging mechanisms were addressed; no attempt was made to limit the evaluation to aging mechanisms ''unique to license renewal,'' as defined in the License Renewal Rule, 10 CFR 54 (1991). The first AMG on Electrical Switchgear was published in July 1993. Six (6) additional AMGs will be published by the first quarter of calendar year 1994. It is anticipated that two more AMGs will be started in 1994. The seven ongoing AMG topics are as follows: (1) battery chargers, inverters and uninterruptible power supplies; (2) batteries, stationary; (3) heat exchangers; (4) motor control centers; (5) pumps; (6) switchgear, electric; (7) transformers, power and distribution. In Section 7, industry feedback regarding AMGs is discussed. Overall, the response has been very positive

  10. COMPARATIVE ANALYSIS OF GROUNDING RESISTANCE VALUE IN SOIL AND SEPTICTANK

    Directory of Open Access Journals (Sweden)

    Abdul Syakur

    2012-02-01

    Full Text Available The aim of grounding system to protect of electrical equipment and instrumentation system and peopletogether. The lightning stroke near the strucutre of building can damage of equipment and instrumentationsystem. Therefore, it is very important to protect theese electrical and electronic equipment from lightningstrike uses lightning protection system and grounding system.This paper presents kind of grounding system at type of soil and place. The measurement of groundingresistance in soil and septictank have done. Types of soil for grounding resistance measuring aremarshland, clay and rockland.The measurement results of grounding resistance show that value of grounding resistance depend ondeepness of electrode and kind of soil and septictank. Grounding resistance value in septictank is morelower than soil.

  11. Report on assessment of electrical equipment aging for nuclear power plant (AEA), FY2011

    International Nuclear Information System (INIS)

    Minakawa, T.

    2012-11-01

    Electrical components with safety function used in nuclear power plants, such as cables, medium voltage motors, low voltage motors, electrical penetration of reactor containment vessel, motor operated valve, pressure transmitter, temperature detector, etc, are required to be operational under the environment of design basis event (DBE) to shut down a reactor safely and to prevent radioactive materials from being leaked to outside. Polymer materials used as parts of these equipments are gradually degraded by thermal and radiation environment in the normal operation. In addition, the degradation is thought to progress rapidly when they are exposed to the DBE environment and a decrease in performance of the equipment may be caused. From these reason, electrical components with safety function are tested for long-term integrity in accordance with IEEE standard. However, conventional method of accelerated aging which assumes thermal and radiation aging during normal operation is said to have uncertainty in simulating the degradation given in actual operating environment. To address this issue, the project of 'Assessment of Cable Aging for Nuclear Power Plants' (ACA, 2002-2008) was carried out and 'Guide for Cable Environmental Qualification Test for Nuclear Power Plant' was developed. The need for developing an aging evaluation method for other electrical and I and C components was pointed out in the 'Strategy maps 2007', prepared by the cooperation among government, industry and academia. Under the circumstance, the project of 'Assessment of Electrical Equipment Aging for Nuclear Power Plants' (AEA) was initiated in FY2008. In this study, parts of electrical and I and C component with safety function used in nuclear power plant whose aging needs to be considered are employed as specimens, and their aging characteristics under the thermal environment and the combined radiation and thermal environment are obtained (herein after referred to as 'critical part test

  12. 46 CFR 111.05-13 - Grounding connection.

    Science.gov (United States)

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-13 Grounding... power sources operating in parallel in the system. ...

  13. A Proactive Aging/Asset Management Model to Optimize Equipment Maintenance Resources Over Plant Lifetime

    International Nuclear Information System (INIS)

    Meyer, Theodore A.; Perdue, Robert K.; Woodcock, Joel; Elder, G. Gary

    2002-01-01

    Experience has shown that proactive aging/asset management can best be defined as an ongoing process. Station goals directly supported by such a process include reducing Unplanned Capability Loss Factor and gaining the optimum value from maintenance and aging management budgets. An effective aging/asset management process must meet evolving and sometimes conflicting requirements for efficient and reliable nuclear power plant operation. The process should identify most likely contributors before they fail, and develop cost-effective contingencies. Current trends indicate the need for focused tools that give quantitative input to decision-making. Opposing goals, such as increasing availability while optimizing aging management budgets, must be balanced. Recognizing the importance of experience in reducing the uncertainty inherent in predicting equipment degradation rates, nuclear industry demographics suggest the need to capture existing expert knowledge in a usable form. The Proactive Aging/Asset Management Process has been developed to address these needs. The proactive approach is a process supported by tools. The process identifies goals and develops criteria - including safety, costs, and power production - that are used to prioritize systems and equipment across the plant. The process then draws upon tools to most effectively meet the plant's goals. The Proactive Aging/Asset Management Model TM is one software-enabled tool designed for mathematical optimization. Results assist a plant in developing a plant-wide plan of aging management activities. This paper describes the proactive aging/asset management process and provides an overview of the methodology that has been incorporated in a model to perform a plant-wide optimization of aging management activities. (authors)

  14. 33 CFR 183.415 - Grounding.

    Science.gov (United States)

    2010-07-01

    ... SAFETY BOATS AND ASSOCIATED EQUIPMENT Electrical Systems Manufacturer Requirements § 183.415 Grounding. If a boat has more than one gasoline engine, grounded cranking motor circuits must be connected to...

  15. A model predictive framework of Ground Source Heat Pump coupled with Aquifer Thermal Energy Storage System in heating and cooling equipment of a building

    NARCIS (Netherlands)

    Rostampour Samarin, V.; Bloemendal, J.M.; Keviczky, T.

    2017-01-01

    This paper presents a complete model of a building heating and cooling equipment and a ground source heat pump (GSHP) coupled with an aquifer thermal energy storage (ATES) system. This model contains detailed
    mathematical representations of building thermal dynamics, ATES system dynamics, heat

  16. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  17. Design and testing of Ground Penetrating Radar equipment dedicated for civil engineering applications: ongoing activities in Working Group 1 of COST Action TU1208

    Science.gov (United States)

    Pajewski, Lara; Manacorda, Guido; Persico, Raffaele

    2015-04-01

    This work aims at presenting the ongoing research activities carried out in Working Group 1 'Novel GPR instrumentation' of the COST (European COoperation in Science and Technology) Action TU1208 'Civil Engineering Applications of Ground Penetrating Radar' (www.GPRadar.eu). The principal goal of the COST Action TU1208 is to exchange and increase scientific-technical knowledge and experience of GPR techniques in civil engineering, simultaneously promoting throughout Europe the effective use of this safe and non-destructive technique in the monitoring of infrastructures and structures. Working Group 1 (WG1) of the Action focuses on the development of innovative GPR equipment dedicated for civil engineering applications. It includes three Projects. Project 1.1 is focused on the 'Design, realisation and optimisation of innovative GPR equipment for the monitoring of critical transport infrastructures and buildings, and for the sensing of underground utilities and voids.' Project 1.2 is concerned with the 'Development and definition of advanced testing, calibration and stability procedures and protocols, for GPR equipment.' Project 1.3 deals with the 'Design, modelling and optimisation of GPR antennas.' During the first year of the Action, WG1 Members coordinated between themselves to address the state of the art and open problems in the scientific fields identified by the above-mentioned Projects [1, 2]. In carrying our this work, the WG1 strongly benefited from the participation of IDS Ingegneria dei Sistemi, one of the biggest GPR manufacturers, as well as from the contribution of external experts as David J. Daniels and Erica Utsi, sharing with the Action Members their wide experience on GPR technology and methodology (First General Meeting, July 2013). The synergy with WG2 and WG4 of the Action was useful for a deep understanding of the problems, merits and limits of available GPR equipment, as well as to discuss how to quantify the reliability of GPR results. An

  18. [Assemblage effect of ground arthropod community in desert steppe shrubs with different ages].

    Science.gov (United States)

    Liu, Ren-Tao; Zhu, Fan; Chai, Yong-Qing

    2014-01-01

    Taking the 6-, 15-, 24- and 36-year-old Caragana intermedia shrubs in desert steppe as a subject, an investigation on soil properties and ground arthropod community was carried out under the shrub and in the open to probe into the assemblage effect of ground arthropod community in desert steppe shrubs with different ages. The results were as follows: 1) In the 6-year-old shrubland, significant differences were only found in soil physical properties (soil texture, soil moisture and electrical conductivity) between the microhabitats under shrub and in the open. Beginning from the 15-year-old shrubland, however, soil organic matter and nutrition (N, P) increased significantly. 2) A total of 27 groups were captured in the studied sites which dominated by Carabidae, Tenebrionidae and Formicidae. From 6- to 15-year-old shrubland, the number of dominant groups decreased while that of common groups increased for the ground arthropod community under the shrub. From 15- to 24- and 36-year-old shrubland, the difference between the microhabitats under the shrub and in the open decreased firstly, and then increased. Some special groups appeared under the shrub in the 36-year-old shrubland, and dung beetles became dominant. 3) In the 6- and 24-year-old shrublands, there were no significant differences in group richness, abundance, and diversity index between the microhabitats under the shrub and in the open. As for the 15- and 36-year-old shrublands, however, significant differences were observed. 4) The shrub age had a stronger effect on the distribution of ground arthropods living under the shrubs compared to that in the open. The changes in soil texture, pH and electrical conductivity could significantly influence on the distribution of ground arthropods under the shrub, also in the open to some degree. It was suggested that the development of shrubland had strong impact on assemblage effect of ground arthropods, which was closely correlated with the stand age and would

  19. Use of commercial grade equipment and industrial standards for equipment qualification

    International Nuclear Information System (INIS)

    Gradin, L.P.; Muller, E.S.

    1984-01-01

    One of the most controversial issues is the proper application of Arrhenius aging methodology. Naturally and artificially aged equipment used in type test programs are often costly and burdensome tasks. Appropriate use of non-nuclear industrial standards and comparison to past history can demonstrate, with reasonable assurance, that equipment is qualified with proper consideration of aging. Specific review of the industrial standards available and application examples are provided

  20. Ground-Water Age and Quality in the High Plains Aquifer near Seward, Nebraska, 2003-04

    Science.gov (United States)

    Stanton, Jennifer S.; Landon, Matthew K.; Turco, Michael J.

    2007-01-01

    The U.S. Geological Survey, in cooperation with the City of Seward, Nebraska, conducted a study of ground-water age and quality to improve understanding of: (1) traveltimes from recharge areas to public-supply wells, (2) the effects of geochemical reactions in the aquifer on water quality, and (3) how water quality has changed historically in response to land-use practices. Samples were collected from four supply wells in the Seward west well field and from nine monitoring wells along two approximate ground-water flow paths leading to the well field. Concentrations of three different chlorofluorocarbons (CFC-12, CFC-11, and CFC-113), sulfur hexafluoride (SF6), and ratios of tritium (3H) to helium-3 (3He) isotope derived from radioactive decay of 3H were used to determine the apparent recharge age of ground-water samples. Age interpretations were based primarily on 3H/3He and CFC-12 data. Estimates of apparent ground-water age from tracer data were complicated by mixing of water of different ages in 10 of the 13 ground-water samples collected. Apparent recharge dates of unmixed ground-water samples or mean recharge dates of young fractions of mixed water in samples collected from monitoring wells ranged from 1985 to 2002. For monitoring-well samples containing mixed water, the fraction of the sample composed of young water ranged from 26 to 77 percent of the sample. Apparent mean recharge dates of young fractions in samples collected from four supply wells in the Seward west well field ranged from about 1980 to 1990. Estimated fractions of the samples composed of young water ranged from 39 to 54 percent. It is implicit in the mixing calculations that the remainder of the sample that is not young water is composed of water that is more than 60 years old and contains no detectable quantities of modern atmospheric tracers. Estimated fractions of the mixed samples composed of 'old' water ranged from 23 to 74 percent. Although alternative mixing models can be used to

  1. IEEE Std 1205-1993: IEEE guide for assessing, monitoring, and mitigating aging effects on Class 1E equipment used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The guidelines are provided for assessing, monitoring, and mitigating degradation of Class 1E equipment used in nuclear power generating stations due to aging. The methods described can be used to identify the performance capability of Class 1E equipment beyond its qualified life. A discussion of stressors and aging mechanisms is included. If aging considerations have been satisfactorily addressed through other means (e.g., equipment qualification), then use of this guide may not be warranted. For some equipment, only partial application of this guide may be warranted

  2. Seasonal Distribution and Diversity of Ground Arthropods in Microhabitats Following a Shrub Plantation Age Sequence in Desertified Steppe

    Science.gov (United States)

    Liu, Rentao; Zhu, Fan; Song, Naiping; Yang, Xinguo; Chai, Yongqing

    2013-01-01

    In desertified regions, shrub-dominated patches are important microhabitats for ground arthropod assemblages. As shrub age increases, soil, vegetation and microbiological properties can change remarkably and spontaneously across seasons. However, relatively few studies have analyzed how ground arthropods respond to the microhabitats created by shrubs of different plantation ages across seasons. Using 6, 15, 24 and 36 year-old plantations of re-vegetated shrubs (Caragana koushinskii) in the desert steppe of northwestern China as a model system, we sampled ground arthropod communities using a pitfall trapping method in the microhabitats under shrubs and in the open areas between shrubs, during the spring, summer and autumn. The total ground arthropod assemblage was dominated by Carabidae, Melolonthidae, Curculionidae, Tenebrionidae and Formicidae that were affected by plantation age, seasonal changes, or the interaction between these factors, with the later two groups also influenced by microhabitat. Overall, a facilitative effect was observed, with more arthropods and a greater diversity found under shrubs as compared to open areas, but this was markedly affected by seasonal changes. There was a high degree of similarity in arthropod assemblages and diversity between microhabitats in summer and autumn. Shrub plantation age significantly influenced the distribution of the most abundant groups, and also the diversity indices of the ground arthropods. However, there was not an overall positive relationship between shrub age and arthropod abundance, richness or diversity index. The influence of plantation age on arthropod communities was also affected by seasonal changes. From spring through summer to autumn, community indices of ground arthropods tended to decline, and a high degree of similarity in these indices (with fluctuation) was observed among different ages of shrub plantation in autumn. Altogether the recovery of arthropod communities was markedly affected by

  3. Using ADA Tasks to Simulate Operating Equipment

    Science.gov (United States)

    DeAcetis, Louis A.; Schmidt, Oron; Krishen, Kumar

    1990-01-01

    A method of simulating equipment using ADA tasks is discussed. Individual units of equipment are coded as concurrently running tasks that monitor and respond to input signals. This technique has been used in a simulation of the space-to-ground Communications and Tracking subsystem of Space Station Freedom.

  4. Development of KSC program for investigating and generating field failure rates. Volume 2: Recommended format for reliability handbook for ground support equipment

    Science.gov (United States)

    Bloomquist, C. E.; Kallmeyer, R. H.

    1972-01-01

    Field failure rates and confidence factors are presented for 88 identifiable components of the ground support equipment at the John F. Kennedy Space Center. For most of these, supplementary information regarding failure mode and cause is tabulated. Complete reliability assessments are included for three systems, eight subsystems, and nine generic piece-part classifications. Procedures for updating or augmenting the reliability results presented in this handbook are also included.

  5. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment

    International Nuclear Information System (INIS)

    Nordling, Anna; Haakansson, Goeran

    2012-01-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  6. Ground reaction forces and kinematics in distance running in older-aged men.

    Science.gov (United States)

    Bus, Sicco A

    2003-07-01

    The biomechanics of distance running has not been studied before in older-aged runners but may be different than in younger-aged runners because of musculoskeletal degeneration at older age. This study aimed at determining whether the stance phase kinematics and ground reaction forces in running are different between younger- and older-aged men. Lower-extremity kinematics using three-dimensional motion analysis and ground reaction forces (GRF) using a force plate were assessed in 16 older-aged (55-65 yr) and 13 younger-aged (20-35 yr) well-trained male distance runners running at a self-selected (SRS) and a controlled (CRS) speed of 3.3 m.s-1. The older subjects ran at significantly lower self-selected speeds than the younger subjects (mean 3.34 vs 3.77 m.s-1). In both speed conditions, the older runners exhibited significantly more knee flexion at heel strike and significantly less knee flexion and extension range of motion. No age group differences were present in subtalar joint motion. Impact peak force (1.91 vs 1.70 BW) and maximal initial loading rate (107.5 vs 85.5 BW.s-1) were significantly higher in the older runners at the CRS. Maximal peak vertical and anteroposterior forces and impulses were significantly lower in the older runners at the SRS. The biomechanics of running is different between older- and younger-aged runners on several relevant parameters. The larger impact peak force and initial loading rate indicate a loss of shock-absorbing capacity in the older runners. This may increase their susceptibility to lower-extremity overuse injuries. Moreover, it emphasizes the focus on optimizing cushioning properties in the design and prescription of running shoes and suggests that older-aged runners should be cautious with running under conditions of high impact.

  7. Management of ageing and obsolescence of electronic equipments used by EDF

    International Nuclear Information System (INIS)

    Grellier, J.M.; Oddi, M.; Simon, G.

    2006-01-01

    The life time of control system is today a great stake for industries which need a high reliability level during a much longer period of time than the usual life time of electronic equipments. Electronic technologies are mainly drawn by performance and miniaturization objectives letting apart the risk of ageing, indeed. Industrial users has therefore to cope with two main phenomena: the commercial obsolescence of electronic cards and the physical ageing of components. In the recent past years, Electricite De France has developed a deep knowledge of these phenomena and has elaborated a method to reduce the associated financial and technical risks. This method is used, partially or totally, in different EDF projects: the assessment of the ageing level of the control systems in EDF nuclear power plants, the elaboration of preventive maintenance actions to enhance the life time of protection relays in the French very high voltage electrical network, and the construction of a renovation plan for the control systems of the medium voltage electrical network in France. (authors)

  8. 49 CFR 229.97 - Grounding fuel tanks.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Grounding fuel tanks. 229.97 Section 229.97 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Equipment § 229.97 Grounding fuel tanks. Fuel tanks and related piping shall be electrically grounded. ...

  9. 21 CFR 225.120 - Buildings and grounds.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Buildings and grounds. 225.120 Section 225.120... Buildings and grounds. Buildings used for production of medicated feed shall provide adequate space for... routine maintenance and cleaning of equipment. Buildings and grounds shall be constructed and maintained...

  10. Effect of low-temperature aging on the mechanical behavior of ground Y-TZP

    NARCIS (Netherlands)

    Pereira, G.K.R.; Amaral, M.; Cesar, P.F.; Bottino, M.C.; Kleverlaan, C.J.; Valandro, L.F.

    2015-01-01

    This study evaluated the effects of low-temperature aging on the surface topography, phase transformation, biaxial flexural strength, and structural reliability of a ground Y-TZP ceramic. Disc-shaped specimens were manufactured and divided according to two factors: "grinding" - without grinding

  11. Electrical Ground System Design of PEFP

    International Nuclear Information System (INIS)

    Mun, Kyeong Jun; Jeon, Gye Po; Park, Sung Sik; Min, Yi Sub; Nam, Jung Min; Cho, Jang Hyung; Kim, Jun Yeon

    2010-01-01

    Since host site host site was selected Gyeong-ju city in January, 2006. we need design revision of Proton Accelerator research center to reflect on host site characteristics and several conditions. In this paper, electrical grounding and lightning protection design scheme is introduced. In electrical grounding system design of PEFP, we classified electrical facilities into 4 groups; equipment grounding (type A), instrument grounding (Type A), high frequency instrument grounding (Type C) and lightning arrestor grounding (Type D). Lightning protection system is designed in all buildings of proton accelerator research center of PEFP, including switchyard

  12. Electrical Ground System Design of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Mun, Kyeong Jun; Jeon, Gye Po; Park, Sung Sik; Min, Yi Sub; Nam, Jung Min; Cho, Jang Hyung; Kim, Jun Yeon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2010-10-15

    Since host site host site was selected Gyeong-ju city in January, 2006. we need design revision of Proton Accelerator research center to reflect on host site characteristics and several conditions. In this paper, electrical grounding and lightning protection design scheme is introduced. In electrical grounding system design of PEFP, we classified electrical facilities into 4 groups; equipment grounding (type A), instrument grounding (Type A), high frequency instrument grounding (Type C) and lightning arrestor grounding (Type D). Lightning protection system is designed in all buildings of proton accelerator research center of PEFP, including switchyard

  13. 29 CFR 1926.951 - Tools and protective equipment.

    Science.gov (United States)

    2010-07-01

    ... falling objects, electric shock, or burns. (b) Personal climbing equipment. (1) Body belts with straps or...) Be equipped with three-wire cord having the ground wire permanently connected to the tool frame and... “Double Insulated”; or (iii) Be connected to the power supply by means of an isolating transformer, or...

  14. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  15. The effect of ground borne vibrations from high speed train on overhead line equipment (OHLE) structure considering soil-structure interaction.

    Science.gov (United States)

    Ngamkhanong, Chayut; Kaewunruen, Sakdirat

    2018-06-15

    At present, railway infrastructure experiences harsh environments and aggressive loading conditions from increased traffic and load demands. Ground borne vibration has become one of these environmental challenges. Overhead line equipment (OHLE) provides electric power to the train and is, for one or two tracks, normally supported by cantilever masts. A cantilever mast, which is made of H-section steel, is slender and has a poor dynamic behaviour by nature. It can be seen from the literature that ground borne vibrations cause annoyance to people in surrounding areas especially in buildings. Nonetheless, mast structures, which are located nearest and alongside the railway track, have not been fully studied in terms of their dynamic behaviour. This paper presents the effects of ground borne vibrations generated by high speed trains on cantilever masts and contact wire located alongside railway tracks. Ground borne vibration velocities at various train speeds, from 100 km/h to 300 km/h, are considered based on the consideration of semi-empirical models for predicting low frequency vibration on ground. A three-dimensional mast structure with varying soil stiffness is made using a finite element model. The displacement measured is located at the end of cantilever mast which is the position of contact wire. The construction tolerance of contact stagger is used as an allowable movement of contact wire in transverse direction. The results show that the effect of vibration velocity from train on the transverse direction of mast structure is greater than that on the longitudinal direction. Moreover, the results obtained indicate that the ground bourn vibrations caused by high speed train are not strong enough to cause damage to the contact wire. The outcome of this study will help engineers improve the design standard of cantilever mast considering the effect of ground borne vibration as preliminary parameter for construction tolerances. Copyright © 2018 Elsevier B

  16. Adaptive Magnetorheological Isolator for Ground Support Equipment, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The minimization of vibration-induced damage has become a critical issue for rocket launch ground support electronics (GSE). In particular, the effect of high...

  17. 21 CFR 226.30 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contamination, including cross-contamination from manufacturing operations. (d) Be suitably grounded... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment. 226.30 Section 226.30 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL...

  18. Voltage surges induced in transformer secondaries with loads characterized by sensitive electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Cogo, Joao Roberto [GSI Engenharia e Consultoria Ltda., Taubate, SP (Brazil)], Email: gsi@gsiconsultoria.com.br; Dommel, Hermann Wilhelm [University of British Columbia, Vancouver (Canada)], Email: hermannd@ece.ubc.ca

    2007-07-01

    The grounding of sensitive electronic equipment such as computers, programmable logic controllers (PLC), process control systems, and other electronic equipment is one of the most important considerations towards obtaining an efficient operation of such systems. Such equipment, which for the purposes of this work is called 'Sensitive Electronic Equipment - SEE' is very sensitive to faults and low intensity random voltages which have no effect upon the electrical power equipment and upon human beings. In this work, the grounding problem is evaluated, to guide the user on the proper installation of SEEs, so as to prevent them from being damaged. The following items will be discussed: voltages which SEEs are subject to during incidence of atmospheric surges in the distribution overhead lines to which they are connected; sustained voltage that the high voltage supply of SEEs must be able to withstand during line-to-ground faults that originate from atmospheric surges that reach the transmission lines which are connected to the electrical power self producers (or electrical power independent producers). (author)

  19. The effect of plant aging on equipment qualification and human performance issues related to license renewal

    International Nuclear Information System (INIS)

    Gunther, W.E.; Higgins, J.C.; Aggarwal, S.K.

    1991-01-01

    The aging of nuclear power plants is one of the most important issues facing the nuclear industry worldwide. Aging encompasses as forms of degradation to nuclear power plant components, systems, and structures that result from exposure to environmental conditions or from operational stresses. Both the degradation from aging and actions taken to address the aging, such as increased maintenance and testing, can significantly impact human performance in the plant. Research into the causes and effects of aging as obtained through the assessment of operating experience and testing have raised questions regarding the adequacy of existing industry standards for addressing the concerns raised by this research. This paper discusses these issues, with particular emphasis in the area of equipment qualification and human performance

  20. The effect of plant aging on equipment qualification and human performance issues related to license renewal

    Energy Technology Data Exchange (ETDEWEB)

    Gunther, W.E.; Higgins, J.C. [Brookhaven National Lab., Upton, NY (United States); Aggarwal, S.K. [Nuclear Regulatory Commission, Washington, DC (United States)

    1991-12-31

    The aging of nuclear power plants is one of the most important issues facing the nuclear industry worldwide. Aging encompasses as forms of degradation to nuclear power plant components, systems, and structures that result from exposure to environmental conditions or from operational stresses. Both the degradation from aging and actions taken to address the aging, such as increased maintenance and testing, can significantly impact human performance in the plant. Research into the causes and effects of aging as obtained through the assessment of operating experience and testing have raised questions regarding the adequacy of existing industry standards for addressing the concerns raised by this research. This paper discusses these issues, with particular emphasis in the area of equipment qualification and human performance.

  1. The effect of plant aging on equipment qualification and human performance issues related to license renewal

    Energy Technology Data Exchange (ETDEWEB)

    Gunther, W.E.; Higgins, J.C. (Brookhaven National Lab., Upton, NY (United States)); Aggarwal, S.K. (Nuclear Regulatory Commission, Washington, DC (United States))

    1991-01-01

    The aging of nuclear power plants is one of the most important issues facing the nuclear industry worldwide. Aging encompasses as forms of degradation to nuclear power plant components, systems, and structures that result from exposure to environmental conditions or from operational stresses. Both the degradation from aging and actions taken to address the aging, such as increased maintenance and testing, can significantly impact human performance in the plant. Research into the causes and effects of aging as obtained through the assessment of operating experience and testing have raised questions regarding the adequacy of existing industry standards for addressing the concerns raised by this research. This paper discusses these issues, with particular emphasis in the area of equipment qualification and human performance.

  2. Laboratory services series: an electrical outlet and corded equipment inspection program

    International Nuclear Information System (INIS)

    Davis, E.A.

    1976-04-01

    A research and development laboratory has thousands of electrical outlets providing power to laboratories, offices, shops, and service areas. These outlets provide power for a wide variety of portable equipment and tools that are equipped with cord and plug. Electric safety requires a periodic check of outlet grounding capability and continuing inspection and repair of corded equipment. Personnel, equipment, reports, procedures, and schedule requirements are reported

  3. Ground Control System Description Document

    International Nuclear Information System (INIS)

    Eric Loros

    2001-01-01

    The Ground Control System contributes to the safe construction and operation of the subsurface facility, including accesses and waste emplacement drifts, by maintaining the configuration and stability of the openings during construction, development, emplacement, and caretaker modes for the duration of preclosure repository life. The Ground Control System consists of ground support structures installed within the subsurface excavated openings, any reinforcement made to the rock surrounding the opening, and inverts if designed as an integral part of the system. The Ground Control System maintains stability for the range of geologic conditions expected at the repository and for all expected loading conditions, including in situ rock, construction, operation, thermal, and seismic loads. The system maintains the size and geometry of operating envelopes for all openings, including alcoves, accesses, and emplacement drifts. The system provides for the installation and operation of sensors and equipment for any required inspection and monitoring. In addition, the Ground Control System provides protection against rockfall for all subsurface personnel, equipment, and the engineered barrier system, including the waste package during the preclosure period. The Ground Control System uses materials that are sufficiently maintainable and that retain the necessary engineering properties for the anticipated conditions of the preclosure service life. These materials are also compatible with postclosure waste isolation performance requirements of the repository. The Ground Control System interfaces with the Subsurface Facility System for operating envelopes, drift orientation, and excavated opening dimensions, Emplacement Drift System for material compatibility, Monitored Geologic Repository Operations Monitoring and Control System for ground control instrument readings, Waste Emplacement/Retrieval System to support waste emplacement operations, and the Subsurface Excavation System

  4. TARDEC Overview: Ground Vehicle Power and Mobility

    Science.gov (United States)

    2011-02-04

    Fuel & Water Distribution • Force Sustainment • Construction Equipment • Bridging • Assured Mobility Systems Robotics • TALON • PackBot • MARCbot...Equipment • Mechanical Countermine Equipment • Tactical Bridging Intelligent Ground Systems • Autonomous Robotics Systems • Safe Operations...Test Cell • Hybrid Electric Reconfigurable Moveable Integration Testbed (HERMIT) • Electro-chemical Analysis and Research Lab (EARL) • Battery Lab • Air

  5. Case study on ground water flow (8)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The report comprises research activities made in fiscal year 1997 under the contract of Japan Nuclear Fuel Cycle Development Center and the main items are: (1) Evaluation of water permeability through discontinuous hard bedrock in deep strata in relevant with underground disposal of radioactive wastes, (2) Three dimensional analysis of permeated water in bedrock, including flow analysis in T ono district using neuro-network and modification of Evaporation Logging System, (3) Development of hydraulic tests and necessary equipment applicable to measurements of complex dielectric constants of contaminated soils using FUDR-V method, this giving information on soil component materials, (4) Investigation methods and modeling of hydraulics in deep strata, (5) Geological study of ground water using environmental isotopes such as {sup 14}C, {sup 36}Cl and {sup 4}He, particularly measurement of ages of ground water using an accelerator-mass spectrometer, and (6) Re-submerging phenomena affecting the long-term geological stability. (S. Ohno)

  6. Case study on ground water flow (8)

    International Nuclear Information System (INIS)

    1999-02-01

    The report comprises research activities made in fiscal year 1997 under the contract of Japan Nuclear Fuel Cycle Development Center and the main items are: (1) Evaluation of water permeability through discontinuous hard bedrock in deep strata in relevant with underground disposal of radioactive wastes, (2) Three dimensional analysis of permeated water in bedrock, including flow analysis in T ono district using neuro-network and modification of Evaporation Logging System, (3) Development of hydraulic tests and necessary equipment applicable to measurements of complex dielectric constants of contaminated soils using FUDR-V method, this giving information on soil component materials, (4) Investigation methods and modeling of hydraulics in deep strata, (5) Geological study of ground water using environmental isotopes such as 14 C, 36 Cl and 4 He, particularly measurement of ages of ground water using an accelerator-mass spectrometer, and (6) Re-submerging phenomena affecting the long-term geological stability. (S. Ohno)

  7. Development of the Thai healthy aging model: A grounded theory study.

    Science.gov (United States)

    Thiamwong, Ladda; McManus, Michael S; Suwanno, Jom

    2013-06-01

    To develop a model of healthy aging from the perspective of Thais, a grounded theory approach, including in-depth interviews and focus groups, was used. A purposive sample of 39 community-dwelling adults aged 40-85 years old was interviewed. The Thai healthy aging model composed of three themes: normality, nature, and dharma. In Thai, they are called tham-ma-da, tham-ma-chat, and tham-ma, or "Thai 3Ts". The theme of normality encompasses subthemes of staying physically active by being involved in plenty of physical activities, and being mentally active with creative and thoughtful hobbies and work. The theme of nature encompasses subthemes of living simply and being careful with money. The theme of dharma encompasses subthemes of enjoyment through helping family and participating in community activities, staying away from stress and worries by talking openly and honestly with someone, making merit, and helping other people without expecting anything in return. A greater understanding of healthy aging is a benefit for older adults and healthcare providers in an intervention-design process. Research can contribute valuable information to shape policy for healthy aging as well. © 2013 Wiley Publishing Asia Pty Ltd.

  8. Methodology development for availability improvement of standby equipment

    International Nuclear Information System (INIS)

    Shin, Sung Min; Jeon, In Seop; Kang, Hyun Gook

    2014-01-01

    The core damage frequency (CDF) of operating and constructing pressurized nuclear plants are ranging on the order of 10 -5 and 10 -6 per year. The target CDF of new NPP design has been set at 10 -7 . In this context, although various systems are currently studied, availability improvement of standby equipment will be more efficient than the additional application of safety systems. It is obvious in every aspect, such as management and cost efficiency. Here, soundness can affect equipment unavailability, and the soundness degrades because of aging. However, some studies did not consider aging when calculating the unavailability. Standby equipment can age because of two important factors: standby stress which accumulates over time, and test stress which accumulates with the number of tests (or operations). Both factors should be considered together when aging is considered. However, some studies only considered standby stress or test stress. There are some previous studies which considered both factors. Besides equipment soundness related to aging effect, some process like bypass during test also can affect equipment unavailability because the original function of equipment cannot be performed immediately during this process. However, there are seldom studies dealing with above factors as a whole problem. This study investigated a general approach to calculate the unavailability of standby equipment which considers aging caused by standby and test stresses and bypass process. Based on this general approach, we propose two maintenance strategies which aim to reduce standby equipment unavailability. In section 2, the general approach is presented. As one of the strategies, the changing test interval method (CIM) is introduced in section 3, and its effectiveness is also analyzed. The online monitoring method (OMM) is investigated in section 4 as another method to reduce equipment unavailability. In section 5, a combination of these two methods is analyzed. A general

  9. Investigation of the effects of a seismic event on accelerated aged components and benefits in equipment life extension

    International Nuclear Information System (INIS)

    Rygg, D.E.; Epstein, J.L.

    1985-01-01

    Westinghouse has performed extensive testing to determine the effects of aging on a wide range of components. Additionally, Westinghouse has an extensive data base of nuclear plant equipment and components. This paper presents how the data base of information on plant parts can be analyzed, modified, and managed or tracked to reflect in-plant parts life extension based on actual tests on aging. Such an approach can benefit utility programs for parts inventory, plant operations and plant availability, and can also reduce the costs of parts reordering. Rather than weigh the merits of the positions in this debate, this paper presents the results of a component aging program which simulates from five to twenty years of operation followed by a seismic event and identifies the possible incorporation of this data into a plant data base which offers quick reference and provides other relevant information on the component and equipment. The use of this data as part of a well structured maintenance and surveillance program offers an avenue to resolve this debate in a cost effective manner

  10. Preliminary simulation model to determine ground-water flow and ages within the Palo Duro Basin hydrogeologic province

    International Nuclear Information System (INIS)

    Atwood, H.; Picking, L.

    1986-01-01

    Ground-water flow through the Palo Duro and Tucumcari Basins is simulated by developing a hydrogeolgic profile and applying a cross-sectional, finite-element, numerical model to the profile. The profile is 350 miles long and 2 miles deep and extends from east-central New Mexico to the Texas-Oklahoma border. It is comprised of hydrogeologic units that are identified from geophysical well logs, sample logs, and core descriptions. A hydrogeologic unit as used in this profile is a physically continuous rock sequence with hydrologic properties that are relatively consistent throughout and distinct from surrounding units. The resulting hydrogeologic profile, with the exception of the Ogallala Formation and the Dockum Group, is discretized into a 6000-element mesh and a 22,000-element mesh. Permeability values assigned to hydrogeologic units were, in part, calculated from drill stem tests conducted throughout the Palo Duro Basin. Ground-water age and travel paths are determined by applying Darcy's equation to selected flow lines. The 170 million-year age determined from ground-water at points within the Wolfcamp Series compares favorably with the geochemical data for this region. An age of 188 million years is determined for the Pennsylvanian granite wash

  11. Imaging-guided thoracoscopic resection of a ground-glass opacity lesion in a hybrid operating room equipped with a robotic C-arm CT system.

    Science.gov (United States)

    Hsieh, Chen-Ping; Hsieh, Ming-Ju; Fang, Hsin-Yueh; Chao, Yin-Kai

    2017-05-01

    The intraoperative identification of small pulmonary nodules through video-assisted thoracoscopic surgery remains challenging. Although preoperative CT-guided nodule localization is commonly used to detect tumors during video-assisted thoracoscopic surgery (VATS), this approach carries inherent risks. We report the case of a patient with stage I lung cancer presenting as an area of ground-glass opacity (GGO) in the right upper pulmonary lobe. He successfully underwent a single-stage, CT-guided localization and removal of the pulmonary nodule within a hybrid operating room (OR) equipped with a robotic C-arm.

  12. The 15th Annual Intelligent Ground Vehicle Competition: Intelligent Ground Robots Created by Intelligent Students

    National Research Council Canada - National Science Library

    Theisen, Bernard L

    2007-01-01

    ..., and mobile platform fundamentals to design and build an unmanned system. Teams from around the world focus on developing a suite of dual-use technologies to equip ground vehicles of the future with intelligent driving capabilities...

  13. NRC Information No. 88-86: Operating with multiple grounds in direct current distribution systems

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    During recent NRC maintenance inspections at Quad Cities, Oconee, and D.C. Cook power reactor facilities, it was found that plants had been operating with multiple grounds in the dc distribution systems for extended periods. Specific examples are described. Most nuclear power plant dc systems are two-wire ungrounded, combination battery/charger systems equipped with ground detection. Typical ground detection system features include a remote annunciator and a local indicator and/or recorder. Ground detectors are incorporated in the dc system so that if a single ground point does occur, immediate steps can be taken to clear the ground fault from the system. Failure to respond to a single ground will mask subsequent grounds. Multiple grounds can cause the indiscriminate operation of equipment, which may have safety consequences. Grounds can cause control circuit fuses to fail and can render important safety equipment inoperable as previously described. Furthermore, batteries have a designed capacity to supply power during a station blackout condition, and this capacity can be affected by the presence of unanalyzed loads in the form of multiple grounds. It is recognized that troubleshooting and finding grounds on a dc system are difficult tasks that may affect plant operation. The licensees previously mentioned have reviewed their designs and conditions for potential impact on safety system operability and have taken corrective actions to minimize the effect of grounds

  14. Vibration aging of diesel-engine mounted electrical equipment

    International Nuclear Information System (INIS)

    Lee, B.J.; Morton, W.C.

    1994-01-01

    The Emergency Diesel Generator (EDG) in a Nuclear Power Plant is considered to be a component which is essential to safe plant operation. Failures of auxiliary equipment directly mounted on the EDG creates costly repairs, and compromises the engine's availability and reliability. Although IEEE-323 requires addressing of safety-related components due to mechanically induced vibration, very few guidelines exist in the nuclear industry to show how this may be accounted for. Most engine vendors rely on the empirical experience data as the basis of their evaluation for vibration. Upgrade of engine controls, addition of monitoring devices and other engine modifications require design and installation of new equipment to be mounted directly on the engine. This necessitates the evaluation for engine-induced vibration which is considered to be one of the most severe design parameters. This paper discusses the engine vibration characteristics, and the acquisition of extensive field vibration data on the diesel engine under operating conditions. The data is then used to develop life cycle vibration qualification test profiles that can be applied with confidence in a laboratory environment to qualify engine-mounted equipment. The intent is to validate a product's ability to survive under worst case, extended service on-engine conditions. This paper describes the procedures and approaches used to achieve those goals, and provides developed profile examples and test results

  15. Hydrogeology, Ground-Water-Age Dating, Water Quality, and Vulnerability of Ground Water to Contamination in a Part of the Whitewater Valley Aquifer System near Richmond, Indiana, 2002-2003

    Science.gov (United States)

    Buszka, Paul M.; Watson, Lee R.; Greeman, Theodore K.

    2007-01-01

    Assessments of the vulnerability to contamination of ground-water sources used by public-water systems, as mandated by the Federal Safe Drinking Water Act Amendments of 1996, commonly have involved qualitative evaluations based on existing information on the geologic and hydrologic setting. The U.S. Geological Survey National Water-Quality Assessment Program has identified ground-water-age dating; detailed water-quality analyses of nitrate, pesticides, trace elements, and wastewater-related organic compounds; and assessed natural processes that affect those constituents as potential, unique improvements to existing methods of qualitative vulnerability assessment. To evaluate the improvement from use of these methods, in 2002 and 2003, the U.S. Geological Survey, in cooperation with the City of Richmond, Indiana, compiled and interpreted hydrogeologic data and chemical analyses of water samples from seven wells in a part of the Whitewater Valley aquifer system in a former glacial valley near Richmond. This study investigated the application of ground-water-age dating, dissolved-gas analyses, and detailed water-quality analyses to quantitatively evaluate the vulnerability of ground water to contamination and to identify processes that affect the vulnerability to specific contaminants in an area of post-1972 greenfield development.

  16. Cleanup Verification Package for the 618-2 Burial Ground

    Energy Technology Data Exchange (ETDEWEB)

    W. S. Thompson

    2006-12-28

    This cleanup verification package documents completion of remedial action for the 618-2 Burial Ground, also referred to as Solid Waste Burial Ground No. 2; Burial Ground No. 2; 318-2; and Dry Waste Burial Site No. 2. This waste site was used primarily for the disposal of contaminated equipment, materials and laboratory waste from the 300 Area Facilities.

  17. Cleanup Verification Package for the 618-2 Burial Ground

    International Nuclear Information System (INIS)

    Thompson, W.S.

    2006-01-01

    This cleanup verification package documents completion of remedial action for the 618-2 Burial Ground, also referred to as Solid Waste Burial Ground No. 2; Burial Ground No. 2; 318-2; and Dry Waste Burial Site No. 2. This waste site was used primarily for the disposal of contaminated equipment, materials and laboratory waste from the 300 Area Facilities

  18. Excavating and loading equipment for peat mining

    Science.gov (United States)

    Mikhailov, A. V.; Zhigulskaya, A. I.; Yakonovskaya, T. B.

    2017-10-01

    Recently, the issues of sustainable development of Russian regions, related to ensuring energy security, are more urgent than ever. To achieve sustainable development, an integrated approach to the use of local natural resources is needed. Practically in all north regions of the Russian Federation, peat as a local natural resource is widespread, which has a practical application in the area of housing services. The paper presents the evaluation of technologies for open-pit peat mining, as well as analysis of technological equipment for peat production. Special attention is paid to a question of peat materials excavating and loading. The problem of equipment selection in a peat surface mine is complex. Many features, restrictions and criteria need to be considered. Use of low and ultra-low ground pressure excavators and low ground pressure front-end loaders with full-range tires to provide the necessary floatation in the peat bog environment is offered.

  19. Aespoe Hard Rock Laboratory. Ground magnetic survey at site for planned facility for calibration of borehole orientation equipment at Aespoe

    Energy Technology Data Exchange (ETDEWEB)

    Mattsson, Haakan (GeoVista AB (Sweden))

    2012-01-15

    This report presents survey description and results of ground magnetic measurements carried out by GeoVista AB at Aespoe in December, 2011. The purpose of the ground magnetic measurement was to measure variations in the earth magnetic field and to gain knowledge of the magnetization of the bedrock in an area where SKB plan to build a facility for calibration of equipment for measurements of borehole orientation. A total of 312 data points were collected along three survey lines, 104 points/profile. The data show nice and smooth variations that appear to be natural. There is a clear consistency of the magnetic field variations between the three survey lines, which indicates that the variations in the magnetic field reflect geological variations related to lithology and content of magnetic minerals. There are no indications of artifacts or erroneous data. The anomaly field averages at -32 nT with peak values of Min = -1,016 nT and Max = +572 nT. The strongest anomalies occur at profile length c. 130-140 m. Adding the background field of 50,823 nT, measured at a base station located close to the survey area, the total magnetic field averages at 50,791+-226 nT. The ground magnetic measurement gives background information before the construction of the calibration facility. The magnetic anomaly at c. 130-140 m give possibilities to control disturbances of magnetic-accelerometer based instruments. The magnetic measurements show that it is possible to construct the facility at the site

  20. Aespoe Hard Rock Laboratory. Ground magnetic survey at site for planned facility for calibration of borehole orientation equipment at Aespoe

    International Nuclear Information System (INIS)

    Mattsson, Haakan

    2012-01-01

    This report presents survey description and results of ground magnetic measurements carried out by GeoVista AB at Aespoe in December, 2011. The purpose of the ground magnetic measurement was to measure variations in the earth magnetic field and to gain knowledge of the magnetization of the bedrock in an area where SKB plan to build a facility for calibration of equipment for measurements of borehole orientation. A total of 312 data points were collected along three survey lines, 104 points/profile. The data show nice and smooth variations that appear to be natural. There is a clear consistency of the magnetic field variations between the three survey lines, which indicates that the variations in the magnetic field reflect geological variations related to lithology and content of magnetic minerals. There are no indications of artifacts or erroneous data. The anomaly field averages at -32 nT with peak values of Min = -1,016 nT and Max = +572 nT. The strongest anomalies occur at profile length c. 130-140 m. Adding the background field of 50,823 nT, measured at a base station located close to the survey area, the total magnetic field averages at 50,791±226 nT. The ground magnetic measurement gives background information before the construction of the calibration facility. The magnetic anomaly at c. 130-140 m give possibilities to control disturbances of magnetic-accelerometer based instruments. The magnetic measurements show that it is possible to construct the facility at the site

  1. Impacts of post-mortem ageing prior to freezing on technological and oxidative properties of coarse ground lamb sausage in a model system

    OpenAIRE

    Juhui Choe; Hyun-Wook Kim; Mustafa M. Farouk; Yuan H. Brad Kim

    2017-01-01

    Objective The objective of this study was to evaluate the effects of ageing time of lamb loins prior to freezing on technological characteristics and oxidation stability of coarse ground lamb loin sausage using in a model system. Methods Lamb loins (M. longissimus lumborum, n = 25) were aged at ?1.5?C for 0, 1, 2, 3, and 8 wk and then frozen for the remaining days (a total of 30 wk). The aged/frozen/thawed lamb loins were ground, and model sausages were formulated with 75% aged/frozen/thawed ...

  2. Measurement of ground motion in various sites

    International Nuclear Information System (INIS)

    Bialowons, W.; Amirikas, R.; Bertolini, A.; Kruecker, D.

    2007-04-01

    Ground vibrations may affect low emittance beam transport in linear colliders, Free Electron Lasers (FEL) and synchrotron radiation facilities. This paper is an overview of a study program to measure ground vibrations in various sites which can be used for site characterization in relation to accelerator design. Commercial broadband seismometers have been used to measure ground vibrations and the resultant database is available to the scientific community. The methodology employed is to use the same equipment and data analysis tools for ease of comparison. This database of ground vibrations taken in 19 sites around the world is first of its kind. (orig.)

  3. Mongolian “Neolithic” and Early Bronze Age ground stone tools from the northern edge of the Gobi Desert

    Directory of Open Access Journals (Sweden)

    Joan S. Schneider

    2016-10-01

    Full Text Available The transition from the Mongolian Neolithic to the Bronze Age is not well understood. Within Ikh Nart Nature Reserve, over a period of five years, we identified a number of sites with dense surface artefact scatters and features that seem to represent this transition period. Evident in those concentrations are characteristic microblade cores, microblades, “thumbnail" flake scrapers, projectile points, ground stone tools, and stone features of unknown function. Between 2012 and 2014 we collected ground stone artefacts from four sites and sediment samples from three sites. With permission of Mongolian authorities, the artefacts from one site and sediment samples from three sites were sent for botanical analyses to the University of Texas, Austin, Environmental Archaeology Laboratory. Preliminary results indicate that plant remains are present on the ground stone artefacts: dendritic long-cells from a deep pore of one artefact and starch grains from the pores of six of the seven artefacts. These data present the first opportunity to understand what resources “Neolithic” people were processing with ground stone tools in this area and further our opportunity to better understand the little-known “Neolithic”-Early Bronze Age transition period in Central Asia. This paper describes the ground stone artefacts and further explores the results of data retrieved from some of these artefacts.

  4. Health Effects of Digital Textbooks on School-Age Children: A Grounded Theory Approach

    OpenAIRE

    Seomun, GA; Lee, JA; Kim, EY; Im, MY; Kim, M; Park, SA; Lee, Y

    2013-01-01

    This qualitative study used the grounded theory approach to analyze digital textbook-related health experiences of school-age children. In-depth interviews were held with 40 elementary school students who had used digital textbooks for at least a year. Data analysis revealed a total of 56 concepts, 20 subcategories, and 11 categories related to digital textbook health issues, the central phenomena being "health-related experiences." Students' health-related experiences were classified into "p...

  5. Radiocarbon ages of ground water as a basis for the determination of safe limits of aquifer exploitation

    International Nuclear Information System (INIS)

    Tamers, M.A.; Stipp, J.J.; Weiner, R.

    1975-01-01

    Deep ground waters of the Biscayne aquifer of south Florida were studied with radiocarbon dating techniques. Dissolved carbonates served as the material for the age determinations. Limestone dilution corrections of the measured carbon-14 activities were made by comparison of the relative concentrations of bicarbonate and total carbonates. The deep well waters of the southern portion of the deposit have corrected radiocarbon contents indicating thermonuclear weapon testing contamination; they are, therefore, less than 20 years old. The ages of the ground waters generally increase in the northern direction. This is interpreted as due to the greater depth of the deposit of that region. A model is formulated for ground water movement in an unconfined producing hydrological unit and applied to the radiocarbon results of the most intensively exploited zone of the Biscayne aquifer. It is shown that the water which is extracted by the municipal wells in this area is limited to the bottom third of the deposit. The avoidance of pollution from the surrounding septic tanks in the shallower depths of the area is explained in this way. The model leads to an objective estimation of the safe limit for the ground water extraction rate in the zone. By application of radiocarbon dating, it is possible to obtain useful information without disturbing the water supply

  6. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  7. Study of grounding system of large tokamak device JT-60

    International Nuclear Information System (INIS)

    Arakawa, Kiyotsugu; Shimada, Ryuichi; Kishimoto, Hiroshi; Yabuno, Kohei; Ishigaki, Yukio.

    1982-01-01

    In the critical plasma testing facility JT-60 constructed by the Japan Atomic Energy Research Institute, high voltage, large current is required in an instant. Accordingly, for the protection of human bodies and the equipment, and for realizing the stable operation of the complex, precise control and measurement system, a large scale facility of grounding system is required. In case of the JT-60 experimental facility, the equipments with different functions in separate buildings are connected, therefore, it is an important point to avoid high potential difference between buildings. In the grounding system for the JT-60, a reticulate grounding electrode is laid for each building, and these electrodes are connected with a low impedance metallic duct called grounding trunk line. The power supply cables for various magnetic field coils, control lines and measurement lines are laid in the duct. It is a large problem to grasp quantitatively the effect of a grounding trunk line by analysis. The authors analyzed the phenomenon that large current flows into a grounding system by lightning strike or grounding. The fundamental construction of the grounding system for the JT-60, the condition for the analysis and the result of simulation are reported. (Kako, I.)

  8. Development of SIR-C Ground Calibration Equipment

    Science.gov (United States)

    Freeman, A.; Azeem, M.; Haub, D.; Sarabandi, K.

    1993-01-01

    SIR-C/X-SAR is currently scheduled for launch in April 1994. SIR-C is an L-Band and C-Band, multi-polarization spaceborne SAR system developed by NASA/JPL. X- SAR is an X-Band SAR system developed by DARA/ASI. One of the problems involved in calibrating the SIR-C instrument is to make sure that the horizontal (H) and vertical (V) polarized beams are aligned in the azimuth direction, i.e.. that they are pointing in the same direction. This is important if the polarimetric performance specifications for the system are to be met. To solve this problem, we have designed and built a prototype of a low-cost ground receiver capable of recording received power from two antennas, one H-polarized, the other V-polarized. The two signals are mixed to audio then recorded on the left and right stereo channels of a standard audio cassette player. The audio cassette recording can then be played back directly into a Macintosh computer, where it is digitized. Analysis of.

  9. A grounded theory of successful aging among select incarcerated older Filipino women.

    Science.gov (United States)

    Lucas, Heizel Mae; Lozano, Carl James; Valdez, Les Paul; Manzarate, Rowena; Lumawag, Fortuna Angelli Jolyn

    Across the literature, impairment and disability among the older people have been associated with a decline in meeting their special needs. Failure in meeting such needs may cause deterioration of function and threaten successful aging. Accordingly, successful aging studies were carried out among males, in health care institutions, and in communities. In spite of these, the process by which successful aging is experienced by incarcerated older women remains to be a blank spot in research. This study purports to describe the process by which incarcerated older Filipino women experience successful aging. Strauss and Corbin's grounded theory design was employed. Semistructured interviews were conducted among 15 purposively selected incarcerated older Filipino from a Philippine penal institution exclusive for women. Further, data gathered was reduced to field text and was analyzed through open, axial and selective coding. Finally, truthfulness and trustworthiness of the findings were established through member checking. The study generated "The Road to Success Model". Interestingly, five phases relative to successful aging emerged, namely: Struggling, Remotivating, Reforming, Reintegrating and Sustaining. These phases describe how select incarcerated older Filipino women undergo transformation towards successful aging. Similar to a road, each phase is considered a station where one must pass through in order to get to the destination. Findings of the study serve as an impetus for structural and procedural changes in prison, with a view to providing an environment conducive to successful aging and appropriate recognition to the older prisoner's efforts to achieve successful aging. Copyright © 2018 Elsevier B.V. All rights reserved.

  10. COST Action TU1208 - Working Group 1 - Design and realisation of Ground Penetrating Radar equipment for civil engineering applications

    Science.gov (United States)

    Pajewski, Lara; Benedetto, Andrea; D'Amico, Sebastiano; Ferrara, Vincenzo; Frezza, Fabrizio; Persico, Raffaele; Tosti, Fabio

    2017-04-01

    frequency-modulated continuous-wave GPR prototype was designed and realized by an Italian research team; detailled instructions, describing how to build this radar step-by-step, will be available by the end of the Action. The idea behind this initiative is to support and encourage institutes in less research-intensive Countries, who cannot afford a commercial system, to build their own prototype for training purposes and to start familiarizing with the GPR technique. 5. A new stepped-frequency ground-coupled multi-antenna GPR system for road and bridge inspection was developed by 3d-radar (manufacturer based in Norway) and presented during the GPR 2014 conference as a contribution to COST Action TU1208. The starting point was an analogous commercial system, with air-coupled antennas. For road inspection, air-coupled antennas offer practical advantages over ground-coupled antennas (mainly, the possibility to carry out measurements at higher speeds); moreover, they allow enhanced detection of shallow layers inside the road structure. On the other hand, data from ground-coupled array contain much more details from individual scatterers, making them more suitable to image the granularity of the road base materials and for bridge deck inspection, where reinforcement rebar has to be imaged. Ground-coupled GPR systems also provide higher penetrating depth due to a stronger coupling of energy into the ground. The novel stepped-frequency ground-coupled GPR exploits an array of boomerang-shaped monopole elements. 6. Recommendations for the safety of people and equipment during GPR prospecting were produced. Despite the increasing demand of GPR surveys all over the world, safety matters are rarely considered. The Action put efforts into debating them, with scientists and professionals performing GPR surveys. As an outcome of this activity, a book was published where a series of recommendations are provided. These include general hints, recommendations for surveys carried out in

  11. 29 CFR 1910.334 - Use of equipment.

    Science.gov (United States)

    2010-07-01

    ... remain connected once they are put in place and are not exposed to damage need not be visually inspected... until repairs and tests necessary to render the equipment safe have been made. (iii) When an attachment... grounding conductor. (ii) Attachment plugs and receptacles may not be connected or altered in a manner which...

  12. Grounding and shielding in the accelerator environment

    International Nuclear Information System (INIS)

    Kerns, Q.

    1991-01-01

    Everyday features of the accelerator environment include long cable runs, high power and low level equipment sharing building space, stray electromagnetic fields and ground voltage differences between the sending and receiving ends of an installation. This paper pictures some Fermilab installations chosen to highlight significant features and presents practices, test methods and equipment that have been helpful in achieving successful shielding. Throughout the report are numbered statements aimed at summarizing good practices and avoiding pitfalls

  13. 46 CFR 176.816 - Miscellaneous systems and equipment.

    Science.gov (United States)

    2010-10-01

    ... 100 GROSS TONS) INSPECTION AND CERTIFICATION Material Inspections § 176.816 Miscellaneous systems and equipment. At each initial and subsequent inspection for certification the owner or managing operator shall be prepared to test and make available for inspection all items in the ship's outfit, such as ground...

  14. Seismic verification of nuclear plant equipment anchorage

    International Nuclear Information System (INIS)

    Lepiece, M.; Van Vyve, J.

    1991-01-01

    More than 60% of the electrical power of Belgium is generated by seven PWR nuclear power plants. For three of them, the electro-mechanical equipment had to be reassessed after ten years of operation, because the seismic requirements were upgraded from 0.1 g to 0.17 g free field ground acceleration. The seismic requalification of the active equipment was a critical problem as the classical methods were too conservative. The approach based on the use of the past experience on the seismic behavior of nonnuclear equipment, chosen and developed by the SQUG, had to be transposed to the Belgian N.P.P. The decision of the accept-ability of equipment relies heavily on the aseismatic capacity of anchorage. The Electrical Power Research Institute (EPRI) developed the procedure and guideline for the demonstration of the aseismatic adequacy of equipment anchorage in a cost-effective and consistent manner, to support the decision by Seismic Review Team. The field inspection procedure to identify the type of fasteners and detect their possible defects and the verification procedure developed to calculate the aseismatic capacity of equipment anchorage on the strength of fasteners, the aseismatic capacity of anchorage and the comparison of the capacity with the demand are reported. (K.I.)

  15. Year long variability of ground electrical conductivity in the sandy ...

    African Journals Online (AJOL)

    Ground electrical conductivity was measured continuously on a soil type in Nigeria for one year using the Model R-50 Soil Test Resistivity Meter Equipment. The Wenner arrangement of electrodes, which is one of the probe methods of ground resistivity measurement, was employed for the measurement. About 67% of all ...

  16. Characteristics of near-field earthquake ground motion

    International Nuclear Information System (INIS)

    Kim, H. K.; Choi, I. G.; Jeon, Y. S.; Seo, J. M.

    2002-01-01

    The near-field ground motions exhibit special response characteristics that are different from those of ordinary ground motions in the velocity and displacement response. This study first examines the characteristics of near-field ground motion depending on fault directivity and fault normal and parallel component. And the response spectra of the near field ground motion are statistically processed, and are compared with the Regulatory Guide 1.60 spectrum that is present design spectrum of the nuclear power plant. The response spectrum of the near filed ground motions shows large spectral velocity and displacement in the low frequency range. The spectral accelerations of near field ground motion are greatly amplified in the high frequency range for the rock site motions, and in the low frequency range for the soil site motions. As a result, the near field ground motion effects should be considered in the seismic design and seismic safety evaluation of the nuclear power plant structures and equipment

  17. Transport of bundles and equipment which contain radioactive material

    International Nuclear Information System (INIS)

    1987-01-01

    This norm settles down: 1) The requirements that should be completed in relation to safety precautions and protection against ionizing radiations during the transport radioactive material and/or equipment containing it, in order to avoid risks to the collective and the environment. 2) The basic information on procedures that will be completed in the event of happening accidents during the transport or the transit storage of radioactive material and/or equipment that contain it. 3) The measures of security and physical protection during the transport of radioactive material and/or equipment containing it. This norm is applied: 1) To all the ways of transport (by air, by ground and by ship, fluvial and marine) of radioactive material and/or equipment that contain it. 2) To all natural or legal, public or private person, devoted to install, produce, trade, market, import or export radioactive materials and/or equipment containing it, and that needs to transport them as main or secondary activity [es

  18. Ageing management and equipment qualification

    International Nuclear Information System (INIS)

    Stahl, Gunnar

    2014-01-01

    The knowledge of how the environment and load of organic material in general and especially polymers and lubricants, is affecting the degradation of important properties, have increased during the last decade. However the restrictions using established additives like some color pigments due to their poisonousness e.g. pigments based at cadmium, lead, mercury etc. have caused problems when replacing additives to polymers. The replacement additives have often been used in new design without going through the required material qualification procedure. There have also been observed that some non-qualified and non-approved materials have been installed in some power plants due to false documentation. There are also a lot of new manufacturers, of materials similar to the previously qualified materials, active at the market. This increases the difficulty to ensure that the required material quality is used. New materials, new additives and new manufacturers makes if more and more difficult to assure that the expected material is present. This causes more strict demands of how the new materials often used in equipment at type-testing and in replacement materials are analyzed and documented. By implementing new steps for chemical, mechanical and electrical analysis and increase the general quality assurance content this issue can be managed. (authors)

  19. Spacelab Level 4 Programmatic Implementation Assessment Study. Volume 2: Ground Processing requirements

    Science.gov (United States)

    1978-01-01

    Alternate ground processing options are summarized, including installation and test requirements for payloads, space processing, combined astronomy, and life sciences. The level 4 integration resource requirements are also reviewed for: personnel, temporary relocation, transportation, ground support equipment, and Spacelab flight hardware.

  20. Exchange of moisture between atmosphere and ground regarding tritium transfer

    International Nuclear Information System (INIS)

    Bunnenberg, C.

    1980-09-01

    Two measuring equipment have been developed in the framework of this study which fulfill important conditions to avoid microclimatic interferences during measurement by using site-specific ground samples and embedding these in the ground surface. The beta-absorption lysimeter allows the detection of a minimum deposit height of 0.001 mm in a 1 mm sample layer. The conductivity moisture probe is to measure the moisture diffusion within the first 80 mm of the upper ground with a vertical spacial resolution of 2 mm. It is possible to measure a minimum water content increase of 0.02 wt% per 2 mm ground layer using this probe. The influences of single microclimatic parameter on condensation and evaporation were investigated and a transport equation was developed. Investigations in the Negev proved the application ability of the measuring equipment. The application of the transport equation showed very good agreement with the measured values. When the ground surface starts to cool in the afternoon, there is a countercurrent moisture transport from the atmosphere and the deeper ground layers which lead to a higher water content in the upper ground layer. At about 50 mm depth there is an overlapping layer of the two moisture flows which remains almost constant over the 24 h cycle. This exchange zone of atmospheric humidity and ground water must be paid great attention with regard to HTO transfer. (orig./HP) [de

  1. Ground processing of the McDonnell Douglas Payload Assist Module (PAM)

    Science.gov (United States)

    Bryan, C. E.; Maclean, D. A.

    1985-01-01

    The payload assist module (PAM) ground processing operations which have evolved since they were started in 1982 are described. The objective of the changes was to reduce the prelaunch testing of the airborne support equipment to increase the throughput of PAM systems while not compromising the reliability of the system when functioned on-orbit. The changes that resulted from the initial cargo element ground processing, the on-orbit performance of the systems, plus the postflight refurbishment and recertification of the airborne support equipment resulted in significant reductions in labor expenditures and work shifts required to prepare a PAM system for flight.

  2. Approximate seismic analysis of piping or equipment mounted on elastoplastic structures

    International Nuclear Information System (INIS)

    Villaverde, R.

    1990-01-01

    A simple approximate procedure is presented to estimate the maximum response of equipment, piping, or any other light secondary system mounted on nonlinear structures subjected to earthquake ground motions. The procedure is based on the consideration of structure and equipment as an integrated combined system, and on a response spectrum method for the analysis of nonlinear multistory structures. It is formulated in terms of the initial dynamic properties of the independent structure and equipment components, and the nonlinear response spectrum of a specified earthquake ground motion. It may be applied to any linear multiple-degree-of-freedom secondary system connected at one or two arbitrary points of a multistory structure. It fully takes into account the interaction between primary and secondary systems and the nonclassical damping character of structure-equipment systems. It is restricted, however, to structures with elastoplastic load-deformation behaviour and to those cases in which the mass of the secondary system is small in comparison with the mass of the structure. Its accuracy is evaluated by means of a comparative study with the numerical integration solutions of a number of idealized systems. In this comparative study, the proposed procedure estimates the numerical integration solutions with an average error of about 2 per cent. (author)

  3. Cleanup Verification Package for the 118-F-1 Burial Ground

    Energy Technology Data Exchange (ETDEWEB)

    E. J. Farris and H. M. Sulloway

    2008-01-10

    This cleanup verification package documents completion of remedial action for the 118-F-1 Burial Ground on the Hanford Site. This burial ground is a combination of two locations formerly called Minor Construction Burial Ground No. 2 and Solid Waste Burial Ground No. 2. This waste site received radioactive equipment and other miscellaneous waste from 105-F Reactor operations, including dummy elements and irradiated process tubing; gun barrel tips, steel sleeves, and metal chips removed from the reactor; filter boxes containing reactor graphite chips; and miscellaneous construction solid waste.

  4. Electromagnetic compatibility for the control and command equipments in nuclear power plants

    International Nuclear Information System (INIS)

    Buisson, J.

    1985-06-01

    Different kinds of electrical interference produce some disturbance on electronic sub-assemblies used to assume the control and the command of nuclear reactors. Following interferences are described: power supply lines perturbations, potential difference between grounding connections, electromagnetic fields. A method is described for testing the EMC of different equipments. The advantages of this method are: no destructive method, usable for testing equipment ''in situ'' in operating conditions on nuclear power plant, usable for testing equipment before operating conditions (acceptance test), level of the testing signals similar to the electrical interference level induced by the electromagnetic environment in normal operating conditions, no particular equipment and installation for test are required [fr

  5. Ground Operations Demonstration Unit for Liquid Hydrogen Initial Test Results

    Science.gov (United States)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-01-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  6. Age and quality of ground water and sources of nitrogen in the aquifers in Pumpkin Creek Valley, western Nebraska, 2000

    Science.gov (United States)

    Steele, G.V.; Cannia, J.C.; Sibray, S.S.; McGuire, V.L.

    2005-01-01

    Ground water is the source of drinking water for the residents of Pumpkin Creek Valley, western Nebraska. In this largely agricultural area, shallow aquifers potentially are susceptible to nitrate contamination. During the last 10 years, ground-water levels in the North Platte Natural Resources District have declined and contamination has become a major problem for the district. In 2000, the U.S. Geological Survey and the North Platte Natural Resources District began a cooperative study to determine the age and quality of the ground water and the sources of nitrogen in the aquifers in Pumpkin Creek Valley. Water samples were collected from 8 surface-water sites, 2 springs, and 88 ground-water sites during May, July, and August 2000. These samples were analyzed for physical properties, nutrients or nitrate, and hydrogen and oxygen isotopes. In addition, a subset of samples was analyzed for any combination of chlorofluorocarbons, tritium, tritium/helium, sulfur-hexafluoride, carbon-14, and nitrogen-15. The apparent age of ground water in the alluvial aquifer typically varied from about 1980 to modern, whereas ground water in the fractured Brule Formation had a median value in the 1970s. The Brule Formation typically contained ground water that ranged from the 1940s to the 1990s, but low-yield wells had apparent ages of 5,000 to 10,000 years before present. Data for oxygen-18 and deuterium indicated that lake-water samples showed the greatest effects from evaporation. Ground-water data showed no substantial evaporative effects and some ground water became isotopically heavier as the water moved downgradient. In addition, the physical and chemical ground-water data indicate that Pumpkin Creek is a gaining stream because little, if any, of its water is lost to the ground-water system. The water-quality type changed from a sodium calcium bicarbonate type near Pumpkin Creek's headwaters to a calcium sodium bicarbonate type near its mouth. Nitrate concentrations were

  7. On reliability and maintenance modelling of ageing equipment in electric power systems

    International Nuclear Information System (INIS)

    Lindquist, Tommie

    2008-04-01

    Maintenance optimisation is essential to achieve cost-efficiency, availability and reliability of supply in electric power systems. The process of maintenance optimisation requires information about the costs of preventive and corrective maintenance, as well as the costs of failures borne by both electricity suppliers and customers. To calculate expected costs, information is needed about equipment reliability characteristics and the way in which maintenance affects equipment reliability. The aim of this Ph.D. work has been to develop equipment reliability models taking the effect of maintenance into account. The research has focussed on the interrelated areas of condition estimation, reliability modelling and maintenance modelling, which have been investigated in a number of case studies. In the area of condition estimation two methods to quantitatively estimate the condition of disconnector contacts have been developed, which utilise results from infrared thermography inspections and contact resistance measurements. The accuracy of these methods were investigated in two case studies. Reliability models have been developed and implemented for SF6 circuit-breakers, disconnector contacts and XLPE cables in three separate case studies. These models were formulated using both empirical and physical modelling approaches. To improve confidence in such models a Bayesian statistical method incorporating information from the equipment design process was also developed. This method was illustrated in a case study of SF6 circuit-breaker operating rods. Methods for quantifying the effect of maintenance on equipment condition and reliability have been investigated in case studies on disconnector contacts and SF6 circuit-breakers. The input required by these methods are condition measurements and historical failure and maintenance data, respectively. This research has demonstrated that the effect of maintenance on power system equipment may be quantified using available data

  8. Apparatus for determining the thermal history of equipment using solid state track recorders

    International Nuclear Information System (INIS)

    Ruddy, F.H.; Lippincott, E.P.; Fero, A.H.; Schreiber, R.B.; Seidel, J.G.

    1991-01-01

    This patent describes a nuclear power plant having equipment subject to thermal aging, the rate of the thermal aging being capable of characterization by at least one equipment Arrhenius function of temperature, the equipment being subjected to a temperature environment having a predetermined range of temperatures, apparatus for determining the thermal aging which has occurred in the equipment. It comprises passive sensors, each of the sensors being formed from a selected material and subject to a thermal aging process within the range of temperatures, the extent of the thermal aging in each respective sensor being quantifiable, the rate at which the thermal aging process progresses in each of the sensors being characterized by a respective Arrhenius function of temperature; and the selected material not being the same for each of the sensors, whereby the range of activation energy values characterizing the respective Arrhenius functions encompasses the activation energy value characterizing the equipment Arrhenius function

  9. TDRSS S-shuttle unique receiver equipment

    Science.gov (United States)

    Weinberg, A.; Schwartz, J. J.; Spearing, R.

    1985-01-01

    Beginning with STS-9, the Tracking and Date Relay Satellite system (TDRSS) will start providing S- and Ku-band communications and tracking support to the Space Shuttle and its payloads. The most significant element of this support takes place at the TDRSS White Sands Ground Terminal, which processes the Shuttle return link S- and Ku-band signals. While Ku-band hardware available to other TDRSS users is also applied to Ku-Shuttle, stringent S-Shuttle link margins have precluded the application of the standard TDRSS S-band processing equipment to S-Shuttle. It was therfore found necessary to develop a unique S-Shuttle Receiver that embodies state-of-the-art digital technology and processing techniques. This receiver, developed by Motorola, Inc., enhances link margins by 1.5 dB relative to the standard S-band equipment and its bit error rate performance is within a few tenths of a dB of theory. An overview description of the Space Shuttle Receiver Equipment (SSRE) is presented which includes the presentation of block diagrams and salient design features. Selected, measured performance results are also presented.

  10. Preliminary estimates of residence times and apparent ages of ground water in the Chesapeake Bay watershed, and water-quality data from a survey of springs

    Science.gov (United States)

    Focazio, Michael J.; Plummer, Niel; Bohlke, John K.; Busenberg, Eurybiades; Bachman, L. Joseph; Powars, David S.

    1998-01-01

    Knowledge of the residence times of the ground-water systems in Chesapeake Bay watershed helps resource managers anticipate potential delays between implementation of land-management practices and any improve-ments in river and estuary water quality. This report presents preliminary estimates of ground-water residence times and apparent ages of water in the shallow aquifers of the Chesapeake Bay watershed. A simple reservoir model, published data, and analyses of spring water were used to estimate residence times and apparent ages of ground-water discharge. Ranges of aquifer hydraulic characteristics throughout the Bay watershed were derived from published literature and were used to estimate ground-water residence times on the basis of a simple reservoir model. Simple combinations of rock type and physiographic province were used to delineate hydrogeomorphic regions (HGMR?s) for the study area. The HGMR?s are used to facilitate organization and display of the data and analyses. Illustrations depicting the relation of aquifer characteristics and associated residence times as a continuum for each HGMR were developed. In this way, the natural variation of aquifer characteristics can be seen graphically by use of data from selected representative studies. Water samples collected in September and November 1996, from 46 springs throughout the watershed were analyzed for chlorofluorocarbons (CFC?s) to estimate the apparent age of ground water. For comparison purposes, apparent ages of water from springs were calculated assuming piston flow. Additi-onal data are given to estimate apparent ages assuming an exponential distribution of ages in spring discharge. Additionally, results from previous studies of CFC-dating of ground water from other springs and wells in the watershed were compiled. The CFC data, and the data on major ions, nutrients, and nitrogen isotopes in the water collected from the 46 springs are included in this report. The apparent ages of water

  11. METHODOLOGICAL PROBLEMS AND WAYS OF CREATION OF THE AIRCRAFT EQUIPMENT TEST AUTOMATED MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Vladimir Michailovich Vetoshkin

    2017-01-01

    Full Text Available The development of new and modernization of existing aviation equipment specimens of different classes are ac- companied and completed by the complex process of ground and flight tests. This phase of aviation equipment life cycle is implemented by means of organizational and technical systems - running centers. The latter include various proving grounds, measuring complex and systems, aircraft, ships, security and flight control offices, information processing laborato- ries and many other elements. The system analysis results of development challenges of the automated control systems of aviation equipment tests operations are presented. The automated control systems are in essence an automated data bank. The key role of development of flight tests automated control system in the process of creation of the automated control sys- tems of aviation equipment tests operations is substantiated. The way of the mobile modular measuring complexes integra- tion and the need for national methodologies and technological standards for database systems design concepts are grounded. Database system, as a central element in this scheme, provides collection, storing and updating of values of the elements described above in pace and the required frequency of the controlled object state monitoring. It is database system that pro- vides the supervisory unit with actual data corresponding to specific moments of time, which concern the state processes, assessments of the progress and results of flight experiments, creating the necessary environment for aviation equipment managing and testing as a whole. The basis for development of subsystems of automated control systems of aviation equip- ment tests operations are conceptual design processes of the respective database system, the implementation effectiveness of which largely determines the level of success and ability to develop the systems being created. Introduced conclusions and suggestions can be used in the

  12. 30 CFR 77.902 - Low- and medium-voltage ground check monitor circuits.

    Science.gov (United States)

    2010-07-01

    ... medium-voltage resistance grounded systems to portable and mobile equipment shall include a fail safe... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Low- and medium-voltage ground check monitor... OF UNDERGROUND COAL MINES Low- and Medium-Voltage Alternating Current Circuits § 77.902 Low- and...

  13. Ageing Management for Electrical and I and C Equipment in the Light of Germany's Nuclear Phaseout

    International Nuclear Information System (INIS)

    Foellner, Lutz; Hienstorfer, Wolfgang; Weich, Alfred

    2012-01-01

    The political decision in Germany to shut-down operation of several Nuclear Power Reactors (NPP's) and to completely terminate the use of Nuclear Power in Germany by 2022 has extensive consequences in matters of the Aging Management. Physical conditions and presumed accident conditions are different for NPP's in power operation and for NPP's in shut-down operation and different aging effects have to be considered. Nevertheless aging management is still required considering the expected extensive time for shut-down operation in order to guarantee the safety functions and the use of qualified components with a sufficient and approved state. All current Aging Management requirements have to be fulfilled in the future as well without any restriction to ensure functionality, reliability and availability. However, it is expected that business management reasons will not allow realizing greater modifications or projects, e.g. exchange of analogue I and C technologies such as Limitations or Reactor Protection System with digital equipment. In the area of I and C which is characterized by many similar I and C-modules a change of strategy begins to emerge: the repair of discontinued modules within the plant under the owner's responsibility and the redesign of modules. Previously, we had reported on the establishment of a systematic Aging Management approach in order to identify aging processes and effects. Since two years the Aging management system has been installed in the NPPs and now we contribute our experience related to the practical handling, the performance and the results of these systems in German NPP's. (author)

  14. Inelastic response evaluation of steel frame structure subjected to near-fault ground motions

    Energy Technology Data Exchange (ETDEWEB)

    Choi, In Kil; Kim, Hyung Kyu; Choun, Young Sun; Seo, Jeong Moon

    2004-04-01

    A survey on some of the Quaternary fault segments near the Korean nuclear power plants is ongoing. It is likely that these faults would be identified as active ones. If the faults are confirmed as active ones, it will be necessary to reevaluate the seismic safety of nuclear power plants located near the fault. This study was performed to acquire overall knowledge of near-fault ground motions and evaluate inealstic response characteristics of near-fault ground motions. Although Korean peninsular is not located in the strong earthquake region, it is necessary to evaluate seismic safety of NPP for the earthquakes occurred in near-fault area with characteristics different from that of general far-fault earthquakes in order to improve seismic safety of existing NPP structures and equipment. As a result, for the seismic safety evaluation of NPP structures and equipment considering near-fault effects, this report will give many valuable information. In order to improve seismic safety of NPP structures and equipment against near-fault ground motions, it is necessary to consider inelastic response characteristics of near-fault ground motions in current design code. Also in Korea where these studies are immature yet, in the future more works of near-fault earthquakes must be accomplished.

  15. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  16. Profit ability versus construction equipment maintenance

    OpenAIRE

    Clutts, Craig A.

    2010-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited Construction equipment is a high cost of capital investment necessary for the successful existence of a private construction company and essential to the mission success of the Naval Construction Force (NCF). The highest impact cost factor other than the initial purchase investment is the expenses related to maintenance and repair. As the equipment ages, the ownership costs decrease an...

  17. A Healthcare Edition of Sporting Equipment for Middle-Aged and Elderly

    Directory of Open Access Journals (Sweden)

    Ching-Sung Wang

    2013-01-01

    Full Text Available The aging phenomenon results in body organ system debilitating, which causes the balance weakening and makes a fall, fracture rate, and further medical cost to increase. The lack of exercise has been linked to increasing the incidence of hypertension, coronary artery disease, osteoporosis, degenerative arthritis, and diabetes. Chronic disease affects patients both in psychological and physiological functions which limit their daily activity. In the past, many researches pointed out that these patients can improve their balance sensation by exercise. Because of the above reasons, this research implementation forms a wireless platform of information connection system and medical data analysis. First of all, the target population in the society focuses on those elderly with the common chronic diseases, such as skeletal muscle diseases and degenerative arthritis. Using the hydraulic resist practicing equipment as the mainstay intervention can help examinee collecting the practice value and further analysis. The platform of information accords not only the data prior and after the exercise but also graphic data presentation and analysis from the medical staff members providing services in the society. It can also provide the medical unit to create data mold and a body health counselor when services in the society.

  18. Simulations of Ground-Water Flow, Transport, Age, and Particle Tracking near York, Nebraska, for a Study of Transport of Anthropogenic and Natural Contaminants (TANC) to Public-Supply Wells

    Science.gov (United States)

    Clark, Brian R.; Landon, Matthew K.; Kauffman, Leon J.; Hornberger, George Z.

    2008-01-01

    Contamination of public-supply wells has resulted in public-health threats and negative economic effects for communities that must treat contaminated water or find alternative water supplies. To investigate factors controlling vulnerability of public-supply wells to anthropogenic and natural contaminants using consistent and systematic data collected in a variety of principal aquifer settings in the United States, a study of Transport of Anthropogenic and Natural Contaminants to public-supply wells was begun in 2001 as part of the U.S. Geological Survey National Water-Quality Assessment Program. The area simulated by the ground-water flow model described in this report was selected for a study of processes influencing contaminant distribution and transport along the direction of ground-water flow towards a public-supply well in southeastern York, Nebraska. Ground-water flow is simulated for a 60-year period from September 1, 1944, to August 31, 2004. Steady-state conditions are simulated prior to September 1, 1944, and represent conditions prior to use of ground water for irrigation. Irrigation, municipal, and industrial wells were simulated using the Multi-Node Well package of the modular three-dimensional ground-water flow model code, MODFLOW-2000, which allows simulation of flow and solutes through wells that are simulated in multiple nodes or layers. Ground-water flow, age, and transport of selected tracers were simulated using the Ground-Water Transport process of MODFLOW-2000. Simulated ground-water age was compared to interpreted ground-water age in six monitoring wells in the unconfined aquifer. The tracer chlorofluorocarbon-11 was simulated directly using Ground-Water Transport for comparison with concentrations measured in six monitoring wells and one public supply well screened in the upper confined aquifer. Three alternative model simulations indicate that simulation results are highly sensitive to the distribution of multilayer well bores where leakage

  19. Ground-Water Flow Direction, Water Quality, Recharge Sources, and Age, Great Sand Dunes National Monument, South-Central Colorado, 2000-2001

    Science.gov (United States)

    Rupert, Michael G.; Plummer, Niel

    2004-01-01

    Great Sand Dunes National Monument is located in south-central Colorado along the eastern edge of the San Luis Valley. The Great Sand Dunes National Monument contains the tallest sand dunes in North America; some rise up to750 feet. Important ecological features of the Great Sand Dunes National Monument are palustrine wetlands associated with interdunal ponds and depressions along the western edge of the dune field. The existence and natural maintenance of the dune field and the interdunal ponds are dependent on maintaining ground-water levels at historic elevations. To address these concerns, the U.S. Geological Survey conducted a study, in collaboration with the National Park Service, of ground-water flow direction, water quality, recharge sources, and age at the Great Sand Dunes National Monument. A shallow unconfined aquifer and a deeper confined aquifer are the two principal aquifers at the Great Sand Dunes National Monument. Ground water in the unconfined aquifer is recharged from Medano and Sand Creeks near the Sangre de Cristo Mountain front, flows underneath the main dune field, and discharges to Big and Little Spring Creeks. The percentage of calcium in ground water in the unconfined aquifer decreases and the percentage of sodium increases because of ionic exchange with clay minerals as the ground water flows underneath the dune field. It takes more than 60 years for the ground water to flow from Medano and Sand Creeks to Big and Little Spring Creeks. During this time, ground water in the upper part of the unconfined aquifer is recharged by numerous precipitation events. Evaporation of precipitation during recharge prior to reaching the water table causes enrichment in deuterium (2H) and oxygen-18 (18O) relative to waters that are not evaporated. This recharge from precipitation events causes the apparent ages determined using chlorofluorocarbons and tritium to become younger, because relatively young precipitation water is mixing with older waters

  20. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  1. Research on Repairable Maintenance Equipment Support of Ground Guidance Kits for a Certain Ammunition%某炮弹地面制导装备可修复维修器材保障研究

    Institute of Scientific and Technical Information of China (English)

    李玉峰; 许路铁; 陈永康; 赵然

    2014-01-01

    Objective To explore repairable maintenance equipment support of ground guidance kits for a certain ammu-nition. Methods Repair levels and repairability of repairable equipment were analyzed. Management of repairable equip-ment, including technology, quality and supply management, financing and scrapped was discussed. Results The steps to determine repair equipment were finalized, and the management rules of repairable equipment were developed. Conclusion A standardized, practical and economically beneficial standard for the classification of repairable equipment was complied. Regulatory framework of repairable equipment in financing, supply, management and recycling was established.%目的:对某炮弹地面制导装备可修复维修器材的保障进行探讨。方法对维修器材的可修复性、修理级别进行分析,研究可修复器材的管理包括可修复器材的技术、质量和供应管理,可修复器材的筹措和报废。结果制定了可修复器材的确定步骤,编制了可修复器材的管理细则。结论编制了紧贴标准和实际、有经济效益的可修复器材划分标准,在可修复器材筹措、供应、管理、回收等环节建立了统一、规范的规章制度。

  2. A fiber Bragg grating acceleration sensor for ground surveillance

    Science.gov (United States)

    Jiang, Shaodong; Zhang, Faxiang; Lv, Jingsheng; Ni, Jiasheng; Wang, Chang

    2017-10-01

    Ground surveillance system is a kind of intelligent monitoring equipment for detecting and tracking the ground target. This paper presents a fiber Bragg grating (FBG) acceleration sensor for ground surveillance, which has the characteristics of no power supply, anti-electromagnetic interference, easy large-scale networking, and small size. Which make it able to achieve the advantage of the ground surveillance system while avoiding the shortcoming of the electric sensing. The sensor has a double cantilever beam structure with a sensitivity of 1000 pm/g. Field experiment has been carried out on a flood beach to examine the sensor performance. The result shows that the detection distance on the walking of personnel reaches 70m, and the detection distance on the ordinary motor vehicle reaches 200m. The performance of the FBG sensor can satisfy the actual needs of the ground surveillance system.

  3. On fundamental concept of anti-earthquake design of equipment and pipings

    International Nuclear Information System (INIS)

    Shibata, H.; Kato, M.

    1979-01-01

    This paper deals with a new concept of anti-earthquake design of equipment and pipings in nuclear power plants. Usual anti-earthquake design of such items starts from the design basis ground motions, via floor responses and ends at the stress analysis of each structural element. However, the same type of equipment are used for plants under various site conditions. The ordinarily used method obliges the repetition of such design procedure on each plant. This new design method has been developed to avoid such time-consuming repetitions. (orig.)

  4. Fiscal 1998 survey report. Welfare equipment (Development of human friendly care support intelligent equipment / Development of home welfare equipment system); 1998 nendo chosa hokokusho. Fukushi kiki (human friendly kaigo shien chino kiki kaihatsu / zaitaku fukushi kiki system kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Since disabled persons increase with a progress of an aging society, while a care power decreases with a decrease in birth rate, development and practical use of the welfare equipment contributing to self-support of aged and handicapped persons, reduction of doctors' or therapists' burdens, and as a result, reduction of medical care costs are desirable. Among them, R and D and practical use are expected of the advanced welfare equipment and system based on human engineering technology contributing to improvement of lives of aged and handicapped persons, and support of nurses and cares of disabled persons. In fiscal 1998, on both human friendly care support intelligent equipment and home welfare equipment system, this project clarified essential technical issues based on the future view, selected some themes to be newly developed in the future, and surveyed and evaluated the details of their R and D concretely. For the former, 'heart disease diagnosis and treatment total support system,' and for the latter, 'body function rehabilitation support system' were surveyed. (NEDO)

  5. COLUMBUS as Engineering Testbed for Communications and Multimedia Equipment

    Science.gov (United States)

    Bank, C.; Anspach von Broecker, G. O.; Kolloge, H.-G.; Richters, M.; Rauer, D.; Urban, G.; Canovai, G.; Oesterle, E.

    2002-01-01

    The paper presents ongoing activities to prepare COLUMBUS for communications and multimedia technology experiments. For this purpose, Astrium SI, Bremen, has studied several options how to best combine the given system architecture with flexible and state-of-the-art interface avionics and software. These activities have been conducted in coordination with, and partially under contract of, DLR and ESA/ESTEC. Moreover, Astrium SI has realized three testbeds for multimedia software and hardware testing under own funding. The experimental core avionics unit - about a half double rack - establishes the core of a new multi-user experiment facility for this type of investigation onboard COLUMBUS, which shall be available to all users of COLUMBUS. It allows for the connection of 2nd generation payload, that is payload requiring broadband data transfer and near-real-time access by the Principal Investigator on ground, to test highly interactive and near-realtime payload operation. The facility is also foreseen to test new equipment to provide the astronauts onboard the ISS/COLUMBUS with bi- directional hi-fi voice and video connectivity to ground, private voice coms and e-mail, and a multimedia workstation for ops training and recreation. Connection to an appropriate Wide Area Network (WAN) on Earth is possible. The facility will include a broadband data transmission front-end terminal, which is mounted externally on the COLUMBUS module. This Equipment provides high flexibility due to the complete transparent transmit and receive chains, the steerable multi-frequency antenna system and its own thermal and power control and distribution. The Equipment is monitored and controlled via the COLUMBUS internal facility. It combines several new hardware items, which are newly developed for the next generation of broadband communication satellites and operates in Ka -Band with the experimental ESA data relay satellite ARTEMIS. The equipment is also TDRSS compatible; the open loop

  6. KSC ground operations planning for Space Station

    Science.gov (United States)

    Lyon, J. R.; Revesz, W., Jr.

    1993-01-01

    At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

  7. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  8. Brief scales to assess physical activity and sedentary equipment in the home

    Directory of Open Access Journals (Sweden)

    Durant Nefertiti

    2010-01-01

    Full Text Available Abstract Background Sedentary behaviors such as TV viewing are associated with childhood obesity, while physical activity promotes healthy weight. The role of the home environment in shaping these behaviors among youth is poorly understood. The study purpose was to examine the reliability of brief parental proxy-report and adolescent self-report measures of electronic equipment and physical activity equipment in the home and to assess the construct validity of these scales by examining their relationship to physical activity, sedentary behavior, and weight status of children and adolescents. Methods Participants were adolescents (n = 189; mean age = 14.6, parents of adolescents (n = 171; mean age = 45.0, and parents of younger children (n = 116; parents mean age = 39.6; children's mean age = 8.3 who completed two surveys approximately one month apart. Measures included a 21-item electronic equipment scale (to assess sedentary behavior facilitators in the home, in the child or adolescent's bedroom, and portable electronics and a 14-item home physical activity equipment scale. Home environment factors were examined as correlates of children's and adolescents' physical activity, sedentary behavior, and weight status after adjusting for child age, sex, race/ethnicity, household income, and number of children in the home. Results Most scales had acceptable test-retest reliability (intraclass correlations were .54 - .92. Parent and adolescent reports were correlated. Electronic equipment in adolescents' bedrooms was positively related to sedentary behavior. Activity equipment in the home was inversely associated with television time in adolescents and children, and positively correlated with adolescents' physical activity. Children's BMI z-score was positively associated with having a television in their bedroom. Conclusions The measures of home electronic equipment and activity equipment were similarly reliable when reported by parents and by

  9. Field Guide for Testing Existing Photovoltaic Systems for Ground Faults and Installing Equipment to Mitigate Fire Hazards

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, William [Brooks Engineering, Vacaville, CA (United States); Basso, Thomas [National Renewable Energy Lab. (NREL), Golden, CO (United States); Coddington, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-10-01

    Ground faults and arc faults are the two most common reasons for fires in photovoltaic (PV) arrays and methods exist that can mitigate the hazards. This report provides field procedures for testing PV arrays for ground faults, and for implementing high resolution ground fault and arc fault detectors in existing and new PV system designs.

  10. Handling and disposal of SP-100 ground test nuclear fuel and equipment

    International Nuclear Information System (INIS)

    Wilson, C.E.; Potter, J.D.; Hodgson, R.D.

    1990-05-01

    The post SP-100 reactor testing period will focus on defueling the reactor, packaging the various radioactive waste forms, and shipping this material to the appropriate locations. Remote-handling techniques will be developed to defuel the reactor. Packaging the spent fuel and activated reactor components is a challenge in itself. This paper presents an overview of the strategy, methods, and equipment that will be used during the closeout phase of nuclear testing

  11. Handling and disposal of SP-100 ground test nuclear fuel and equipment

    International Nuclear Information System (INIS)

    Wilson, C.E.; Potter, J.D.; Hodgson, R.D.

    1991-01-01

    The post SP-100 reactor testing period will focus on defueling the reactor, packaging the various radiactive waste forms, and shipping this material to the appropriate locations. Remote-handling techniques will be developed to defuel the reactor. Packaging the spent fuel and activated reactor components is a challenge in itself. This paper presents an overview of the strategy, methods, and equipment that will be used during the closeout phase of nuclear testing

  12. Equipment response spectra for base-isolated shear beam structures

    International Nuclear Information System (INIS)

    Ahmadi, G.; Su, L.

    1992-01-01

    Equipment response spectra in base-isolated structure under seismic ground excitations are studied. The equipment is treated as a single-degree-of-freedom system attached to a nonuniform elastic beam structural model. Several leading base isolation systems, including the laminated rubber bearing, the resilient-friction base isolator with and without a sliding upper plate, and the EDF system are considered. Deflection and acceleration response spectra for the equipment and the shear beam structure subject to a sinusoidal and the accelerogram of the N00W component of El Centro 1940 earthquake are evaluated. Primary-secondary interaction effects are included in the analysis. Several numerical parametric studies are carried out and the effectiveness of different base isolation systems in protecting the nonstructural components is studied. It is shown that use of properly designed base isolation systems provides considerable protection for secondary systems, as well as, the structure against severe seismic loadings. (orig.)

  13. Methodological proposal of grounding in commercial and industrial installations

    International Nuclear Information System (INIS)

    Rodriguez Araya, Michael Eduardo

    2013-01-01

    A methodology is elaborated for the design of methods of commercial and industrial grounding. International standards and technical documents related with the grounding in the electrical design are studied in commercial and industrial installations. The design techniques of earthing systems are investigated. The topics that were covered to develop a design proposal have been: the analysis of resistivity, soil types, calculations of step voltages, contact and voltage of mesh. A field visit is programmed in nearby of the Escuela de Ingenieria Electrica at the Universidad de Costa Rica, to realize the pertinent measurements of resistivity for the design of a hypothetical grounding mesh for a future installation. The tellurometer (GP-1 model) of the brand Amprobe Instrument was used to provide the data from ground resistivity. The equipment has used four electrodes and has implemented the Wenner method for calculations. A earthing design is realized in a company in the industrial or commercial sector of Costa Rica. The earthing designs are realized to protect equipments found at the site and are affected by conditions such as: atmospheric overloads, transients, sags, interruptions or any event that may to affect the quality of the energy. The resistivity of an ground has depended largely on the amount of moisture that has presented. A correct earthing system should cover the greater amount of the total area of the building, and to comply with the voltage of mesh necessary for the design has been optimal. The design of any earthing has depended on unique characteristics that have been indicated by the location of industry [es

  14. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  15. Proposed design criteria for a fusion facility electrical ground system

    International Nuclear Information System (INIS)

    Armellino, C.A.

    1983-01-01

    Ground grid design considerations for a nuclear fusion reactor facility are no different than any other facility in that the basis for design must be safety first and foremost. Unlike a conventional industrial facility the available fault energy comes not only from the utility source and in-house rotating machinery, but also from energy storage capacitor banks, collapsing magnetic fields and D.C. transmission lines. It is not inconceivable for a fault condition occurrence where all available energy can be discharged. The ground grid must adequately shunt this sudden energy discharge in a way that personnel will not be exposed by step and/or touch to hazardous energy levels that are in excess of maximum tolerable levels for humans. Fault energy discharge rate is a function of the ground grid surge impedance characteristic. Closed loop paths must be avoided in the ground grid design so that during energy discharge no stray magnetic fields or large voltage potentials between remote points can be created by circulating currents. Single point connection of equipment to the ground grid will afford protection to personnel and sensitive equipment by reducing the probability of circulating currents. The overall ground grid system design is best illustrated as a wagon wheel concept with the fusion machine at the center. Radial branches or spokes reach out to the perimeter limits designated by step-and-touch high risk areas based on soil resistivity criteria considerations. Conventional methods for the design of a ground grid with all of its radial branches are still pertinent. The center of the grid could include a deep well single ground rod element the length of which is at least equivalent to the radius of an imaginary sphere that enshrouds the immediate machine area. Special facilities such as screen rooms or other shielded areas are part of the ground grid system by way of connection to radial branches

  16. Life sciences payload definition and integration study, task C and D. Volume 4: Preliminary equipment item specification catalog

    Science.gov (United States)

    1973-01-01

    A specification catalog to define the equipment to be used for conducting life sciences experiments in a space laboratory is presented. The specification sheets list the purpose of the equipment item, and any specific technical requirements which can be identified. The status of similar hardware for ground use is stated with comments regarding modifications required to achieve spaceflight qualified hardware. Pertinent sketches, commercial catalog sheets, or drawings of the applicable equipment are included.

  17. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  18. Quality assurance for radiodiagnostic equipment in Uruguay

    International Nuclear Information System (INIS)

    Cotelo, Elena D.

    2001-01-01

    Since Uruguay did not have an study on X-ray equipment, students of Radiation Protection course (RP) made this field work throughout the country. The objective is to obtain information on the number and kind of X-ray radiodiagnostic equipment. Some of the results are: there are 666 radiodiagnostic equipment. The ratio of population to equipment is 4.515 to 1 in the capital and the mean rate in the rest of the country is 4.383 to one, with a minimum of 1.707 and a maximum of 8.220. The Public Health Ministry (MSP) and the Instituciones de Asistencia Medica Colectiva (a kind of private heath assurance) (IAMC) have less equipment in the capital than in the rest of the country. The 37% of the capital population receives assistance through the IAMC , with a 42.5 % of the equipment. Uruguay except the capital has 18 districts and 17 computed tomography equipment, from which only 3 belong to the MSP. Five districts do not have any. In Montevideo, there are 11.500 females over forty years of age per X-ray mammography equipment, and this relation in the rest of the country is 13.900. There are 21 X-ray Interventional radiology equipment, 16 of them are in the capital. Is from relating the radiodiagnostic equipment, the population and the procedures, that quality assistance indicators emerge. This owns high importance on the way to create a RP National Programme. (author)

  19. Tritium in the burial ground of the Savannah River Site

    International Nuclear Information System (INIS)

    Hyder, M.L.

    1993-06-01

    This memorandum reviews the available information on tritium-contaminated material discarded to burial grounds. Tritium was the first isotope studied because it represents the most immediate concern with regard to release to the environment. Substantial amounts of tritium are known to be present in the ground water underneath the area, and outcropping of this ground water in springs and seeps has been observed. The response to this release of tritium from the burial ground is a current concern. The amount of tritium emplaced in the burial ground facilities is very uncertain, however, some general conclusions can be made. In particular, most of the tritium buried is associated with spent equipment and other waste, rather than spent melts. Correspondingly, most of the tritium in the ground water seems to be associated with burials of this type, rather than the spent melts. Maps are presented showing the location of burials of tritiated waste by type, and the location of the largest individual burials according to COBRA records

  20. From Darwin to constructivism: the evolution of grounded theory.

    Science.gov (United States)

    Hall, Helen; Griffiths, Debra; McKenna, Lisa

    2013-01-01

    To explore the evolution of grounded theory and equip the reader with a greater understanding of the diverse conceptual positioning that is evident in the methodology. Grounded theory was developed during the modernist phase of research to develop theories that are derived from data and explain human interaction. Its philosophical foundations derive from symbolic interactionism and were influenced by a range of scholars including Charles Darwin and George Mead. Rather than a rigid set of rules and procedures, grounded theory is a way of conceptualising data. Researchers demonstrate a range of perspectives and there is significant variation in the way the methodology is interpreted and executed. Some grounded theorists continue to align closely with the original post-positivist view, while others take a more constructivist approach. Although the diverse interpretations accommodate flexibility, they may also result in confusion. The grounded theory approach enables researchers to align to their own particular world view and use methods that are flexible and practical. With an appreciation of the diverse philosophical approaches to grounded theory, researchers are enabled to use and appraise the methodology more effectively.

  1. Maintenance related to life management: Survey and control of equipment ageing

    International Nuclear Information System (INIS)

    Hevia Ruperez, F.

    2000-01-01

    The aim of this paper is to review relevant objectives and aspects of the Maintenance Evaluation and Improvement Programmes for Nuclear Power Plant Life Management. Recent experience shows that current maintenance practice often fails to directly address long-term degradation that affects singular plant components and equipment populations. Instead, delayed attention to the consequences makes good Life Management unfeasible. This has brought about the need for specific Maintenance Evaluation and Improvement Programmes to adjust to the basic objective of Life Management which is to protect against, mitigate and/or monitor ageing that affects the safe, profitable life of the facility. The paper analyses the methodologies used, incidents during their application and the main conclusions reached from the implementation of these programmes in Spanish nuclear power plants. Special attention is paid to recommended solutions for improving the efficiency of the utility's contributions, its leadership in task development and integration, and its interfaces with organisations specialised in providing services that support Life Management Programmes. The coexistence of these and other similar maintenance programmes make it necessary to integrate tasks to optimise effort and tools. The paper analyses the guidelines to be considered when integrating these Programmes with other maintenance optimisation programmes (economy and feasibility, RCM) and with tasks derived from the application of Maintenance Rule regulatory requirements. Lastly, the paper reports on the state of these Maintenance Evaluation and Improvement Programmes, their development, what prospects they have, and the Industry's initiative and actions concerning the matter. (author)

  2. New technology for optimized I and C maintenance and management of ageing of critical equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2000-01-01

    Advanced sensors and new testing and maintenance technologies have become available over the last ten years for nuclear power plants (NPPs) to replace outdated, obsolete, and troublesome instruments, provide for management of ageing of critical plant equipment, optimize maintenance activities, reduce maintenance costs and personnel radiation exposure, and at the same time, improve plant safety and availability. These new developments are reviewed in this TECDOC. The material covered here has been summarized from NUREG/CR-5501, a 1998 report written by H.M. Hashemian and his co-authors for the US Nuclear Regulatory Commission. (author)

  3. Higher Ground : Stevie Wonder och New Age

    OpenAIRE

    Nyman, Jonas

    2005-01-01

    Syftet med min uppsats är att jämföra religiösa företeelser från tre av Stevie Wonders album med New Age för att på så sätt uttröna om Stevie Wonders texter påverkats av New Age- föreställningar. Jag hittar både skillnader och likheter när jag jämför det religiösa budskapet i Stevie Wonders texter med New Age. De New Age- företeelser som går att hitta i texterna är få i förhållande till New Age i sin helhet och det är svårt att avgöra vilka influenser som kommer ifrån Stevie Wonder, New Age ...

  4. Lightning and surge protection of large ground facilities

    Science.gov (United States)

    Stringfellow, Michael F.

    1988-04-01

    The vulnerability of large ground facilities to direct lightning strikes and to lightning-induced overvoltages on the power distribution, telephone and data communication lines are discussed. Advanced electrogeometric modeling is used for the calculation of direct strikes to overhead power lines, buildings, vehicles and objects within the facility. Possible modes of damage, injury and loss are discussed. Some appropriate protection methods for overhead power lines, structures, vehicles and aircraft are suggested. Methods to mitigate the effects of transients on overhead and underground power systems as well as within buildings and other structures are recommended. The specification and location of low-voltage surge suppressors for the protection of vulnerable hardware such as computers, telecommunication equipment and radar installations are considered. The advantages and disadvantages of commonly used grounding techniques, such as single point, multiple and isolated grounds are compared. An example is given of the expected distribution of lightning flashes to a large airport, its buildings, structures and facilities, as well as to vehicles on the ground.

  5. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  6. Adaptive ground implemented phase array

    Science.gov (United States)

    Spearing, R. E.

    1973-01-01

    The simulation of an adaptive ground implemented phased array of five antenna elements is reported for a very high frequency system design that is tolerant to the radio frequency interference environment encountered by a tracking data relay satellite. Signals originating from satellites are received by the VHF ring array and both horizontal and vertical polarizations from each of the five elements are multiplexed and transmitted down to ground station. A panel on the transmitting end of the simulation chamber contains up to 10 S-band RFI sources along with the desired signal to simulate the dynamic relationship between user and TDRS. The 10 input channels are summed, and desired and interference signals are separated and corrected until the resultant sum signal-to-interference ratio is maximized. Testing performed with this simulation equipment demonstrates good correlation between predicted and actual results.

  7. FY 2000 Research and development of technology for medical and welfare equipment. Report on the comprehensive survey on welfare equipment; 2000 nendo iryo fukushi kiki gijutsu kenkyu kaihatsu chosa hokokusho. Fukushi kiki sogo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The survey is conducted on the advanced basic and application technologies for medical and welfare equipment, e.g., biotechnology and drug delivery systems, to promote development of these technologies. For development of the gene-aided diagnostic system equipment for clinical purposes, surveys are conducted on current medical equipment and related technologies, and the results are summarized and pigeonholed for each equipment type. Also summarized are the small- to medium-sized enterprises which are considered to have techniques needed for development of sensors for heart disease treatment systems. For usability of welfare-related equipment products, investigations are made viewed from the designs oriented to human adaptability, human adaptable designs in the aging societies, and welfare-related problems in the aging societies and usability. The latest information on leading organizations and researchers is collected, for continuation and development of the usability programs for welfare-related equipment products, and also for inviting the current related technologies and researchers on life supporting for the aged in Japan to the programs. (NEDO)

  8. Contact Dermatitis to Personal Sporting Equipment in Youth.

    Science.gov (United States)

    Marzario, Barbara; Burrows, Dianne; Skotnicki, Sandy

    2016-07-01

    Contact dermatitis to personal sporting equipment in youth is poorly studied. To review the results of patch testing 6 youth to their sporting equipment in a dermatology general private practice from 2006 to 2011. A retrospective analysis of 6 youth aged 11 to 14 who were evaluated for chronic and persistent dermatitis occurring in relation to sports equipment was conducted. All patients were subjected to epicutaneous (patch) testing, which included some or all of the following: North American Contact Dermatitis Group (NACGD) series, textile series, rubber series, corticosteroid series, and raw material from the patients' own personal equipment. All cases had 1 or more positive patch test reactions to an allergen within the aforementioned series, and 3 subjects tested positive to their personal equipment in raw form. Allergic contact dermatitis, not irritant, was deemed the relevant cause of chronic dermatitis in 4 of the 6 patients due to positive reactions to epicutaneous tests and/or personal equipment. The utility of testing to patients' own sporting equipment was shown to be of additional value and should be considered when patch testing for contact allergy to sporting equipment. © The Author(s) 2015.

  9. The application of GPS time information in the telemetry ground station

    International Nuclear Information System (INIS)

    Zhang Songtao; Zhang Yusong; Sun Xiurui

    2001-01-01

    GPS time information is a kind of practicable information resource that can be shared all over the world. Now it is the most accurate wireless time information. The major of this paper is the application information of GPS time information in telemetry. The main point introduces how to make use of the GPS time information to produce GPS-IRIG-B time code for proving ground and how to send time information to related equipment in telemetry ground station

  10. Tethered Pyrotechnic Apparatus for Acquiring a Ground Sample

    Science.gov (United States)

    Jones, Jack; Zimmerman, Wayne; Wu, Jiunn Jenq; Badescu, Mircea; Sherrit, Stewart

    2009-01-01

    A proposed alternative design for the balloon-borne ground-sampling system described in the immediately preceding article would not rely on free fall to drive a harpoonlike sample-collecting device into the ground. Instead, the harpoon-like sample-collecting device would be a pyrotechnically driven, tethered projectile. The apparatus would include a tripod that would be tethered to the gondola. A gun for shooting the projectile into the ground would be mounted at the apex of the tripod. The gun would include an electronic trigger circuit, a chamber at the breech end containing a pyrotechnic charge, and a barrel. A sabot would be placed in the barrel just below the pyrotechnic charge, and the tethered projectile would be placed in the barrel just below the sabot. The tripod feet would be equipped with contact sensors connected to the trigger circuit. In operation, the tripod would be lowered to the ground on its tether. Once contact with the ground was detected by the sensors on all three tripod feet, the trigger circuit would fire the pyrotechnic charge to drive the projectile into the ground. (Requiring contact among all three tripod feet and the ground would ensure that the projectile would be fired into the ground, rather than up toward the gondola or the balloon.) The tethered projectile would then be reeled back up to the gondola for analysis of the sample.

  11. Approximating the ground state of gapped quantum spin systems

    Energy Technology Data Exchange (ETDEWEB)

    Michalakis, Spyridon [Los Alamos National Laboratory; Hamza, Eman [NON LANL; Nachtergaele, Bruno [NON LANL; Sims, Robert [NON LANL

    2009-01-01

    We consider quantum spin systems defined on finite sets V equipped with a metric. In typical examples, V is a large, but finite subset of Z{sup d}. For finite range Hamiltonians with uniformly bounded interaction terms and a unique, gapped ground state, we demonstrate a locality property of the corresponding ground state projector. In such systems, this ground state projector can be approximated by the product of observables with quantifiable supports. In fact, given any subset {chi} {contained_in} V the ground state projector can be approximated by the product of two projections, one supported on {chi} and one supported on {chi}{sup c}, and a bounded observable supported on a boundary region in such a way that as the boundary region increases, the approximation becomes better. Such an approximation was useful in proving an area law in one dimension, and this result corresponds to a multi-dimensional analogue.

  12. Site investigation - equipment for geological, geophysical, hydrogeological and hydrochemical characterization

    International Nuclear Information System (INIS)

    Almen, K.E.; Fridh, B.; Johansson, B.E.; Sehlstedt, M.

    1986-11-01

    The investigations are performed within a site investigation program. In total about 60,000 m of cored 56 mm boreholes have been drilled and investigated at eight study sites. A summarized description of the main investigation methods is included. Instruments for geophysical investigations contains equipment for ground measurements as well as for borehole logging. The Geophysical investigations including the borehole radar measurements, are indirect methods for the geological and hydrogeological characterization of the rock formation. Great effort has been laid on the development of hydrogeological instruments for hydraulic tests and groundwater head measurements. In order to obtain hydrochemical investigations with high quality, a complete system for sampling and analysis of ground water has been developed. (orig./PW)

  13. Active seismic response control systems for nuclear power plant equipment facilities

    International Nuclear Information System (INIS)

    Kobori, Takuji; Kanayama, Hiroo; Kamagata, Shuichi

    1989-01-01

    To sustain severe earthquake ground motion, a new type of anti-seismic structure is proposed, called a Dynamic Intelligent Building (DIB) system, which is positioned as an active seismic response controlled the structure. The structural concept starts from a new recognition of earthquake ground motion, and the structural natural frequency is actively adjusted to avoid resonant vibration, and similarly the external counter-force cancels the resonant force which comes from the dynamic structural motion energy. These concepts are verified using an analytical simulator program. The advanced application of the DIB system, is the Active Supporting system and the Active Stabilizer system for nuclear power plant equipment facilities. (orig.)

  14. Beads of the Birsk Burial Ground in the Context of the Antiquities of the Early Middle Ages

    Directory of Open Access Journals (Sweden)

    Ruslanova Rida Raisovna

    2016-04-01

    Full Text Available Early Middle Ages in the Southern Urals is the time of the tumultuous ethnocultural processes, that is an echo of the era of the Great Migration. At this time, the bakhmutinskaya culture was formed (3rd-8th centuries A.D.. The Birsk burial ground is one of the unique monuments of this period – it appeared in the second third of the 1st millennium B.C. The Birsk burial ground is a fiducial monument for studying history, ethno-cultural, migration and trade processes occurring in the Southern Urals, and the content in the composition of grave goods makes it supplies an important source in the study of early medieval history of East European forest. A variety of types of beads from the Birsk burial ground allows suggesting that the necropolis was one of the major points on the caravan trade and exchange path. According to it, the exchange could take place on imports of products (furs, honey, metals. The article describes a set of beads from the Birsk burials – evidence of a monument in the system of early medieval antiquities (3rd-8th centuries A.D.. The complex morpho-technological research dealt with 218 complexes containing 6705 instances of beads and jewelry. The feature of the monument is the presence of necklaces jewelry from all the selected materials along with the material. The Birsk burial ground demonstrates various forms of products, colors used glass for monochrome and polychrome decorations. The presented work can be used in the study of material culture and trade exchange operations of the medieval population of the Urals.

  15. Mechanisms which help explain implementation of evidence-based practice in residential aged care facilities: a grounded theory study.

    Science.gov (United States)

    Masso, Malcolm; McCarthy, Grace; Kitson, Alison

    2014-07-01

    The context for the study was a nation-wide programme in Australia to implement evidence-based practice in residential aged care, in nine areas of practice, using a wide range of implementation strategies and involving 108 facilities. The study drew on the experiences of those involved in the programme to answer the question: what mechanisms influence the implementation of evidence-based practice in residential aged care and how do those mechanisms interact? The methodology used grounded theory from a critical realist perspective, informed by a conceptual framework that differentiates between the context, process and content of change. People were purposively sampled and invited to participate in semi-structured interviews, resulting in 44 interviews involving 51 people during 2009 and 2010. Participants had direct experience of implementation in 87 facilities, across nine areas of practice, in diverse locations. Sampling continued until data saturation was reached. The quality of the research was assessed using four criteria for judging trustworthiness: credibility, transferability, dependability and confirmability. Data analysis resulted in the identification of four mechanisms that accounted for what took place and participants' experiences. The core category that provided the greatest understanding of the data was the mechanism On Common Ground, comprising several constructs that formed a 'common ground' for change to occur. The mechanism Learning by Connecting recognised the ability to connect new knowledge with existing practice and knowledge, and make connections between actions and outcomes. Reconciling Competing Priorities was an ongoing mechanism whereby new practices had to compete with an existing set of constantly shifting priorities. Strategies for reconciling priorities ranged from structured approaches such as care planning to more informal arrangements such as conversations during daily work. The mechanism Exercising Agency bridged the gap between

  16. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  17. CONCEPTUAL DESIGN OF MONITORING AND CONTROL SUBSYSTEM FOR GNSS GROUND STATION

    Directory of Open Access Journals (Sweden)

    Seongkyun Jeong

    2007-12-01

    Full Text Available The Global Navigation Satellite System (GNSS becomes more important and is applied to various systems. Recently, the Galileo navigation system is being developed in Europe. Also, other countries like China, Japan and India are developing the global/regional navigation satellite system. As various global/regional navigation satellite systems are used, the navigation ground system gets more important for using the navigation system reasonably and efficiently. According to this trend, the technology of GNSS Ground Station (GGS is developing in many fields. The one of purposes for this study is to develop the high precision receiver for GNSS sensor station and to provide ground infrastructure for better performance services on navigation system. In this study, we consider the configuration of GNSS Ground Station and analyze function of Monitoring and Control subsystem which is a part of GNSS Ground Station. We propose Monitoring and Control subsystem which contains the navigation software for GNSS Ground System to monitor and control equipments in GNSS Ground Station, to spread the applied field of navigation system, and to provide improved navigation information to user.

  18. Health effects of digital textbooks on school-age children: a grounded theory approach.

    Science.gov (United States)

    Seomun, Gyeongae; Lee, Jung-Ah; Kim, Eun-Young; Im, Meeyoung; Kim, Miran; Park, Sun-A; Lee, Youngjin

    2013-10-01

    This qualitative study used the grounded theory approach to analyze digital textbook-related health experiences of school-age children. In-depth interviews were held with 40 elementary school students who had used digital textbooks for at least a year. Data analysis revealed a total of 56 concepts, 20 subcategories, and 11 categories related to digital textbook health issues, the central phenomena being "health-related experiences." Students' health-related experiences were classified into "physical" and "psychological" symptoms. Adverse health effects related to digital textbook usage were addressed via both "student-led" and "instructor-led" coping strategies. Students' coping strategies were often inefficient, but instructor-led strategies seemed to prevent health problems. When health issues were well managed, students tended to accept digital textbooks as educational tools. Our findings suggest that students can form healthy computer habits if digital textbook usage is directed in a positive manner.

  19. Biologically Active Zone Enhancement (BAZE) for In Situ RDX Degradation in Ground Water

    Science.gov (United States)

    2010-01-01

    x 3 m) stainless steel tubing equipped with an in-line flow-through cell (Figures 21 and 22). Sampling equipment was decontaminated prior to...demonstration. Jeff Breckenridge from the U.S. Army Corps of Engineer-Center of Expertise (Hazardous Toxic and Radioactive Waste) assisted in the collection...injection/recirculation system. The pump was suspended 60-LF (18.3 m) below ground surface (bgs) by a stainless steel cable attached to the well

  20. Outline of new extra high voltage research equipment at Kumatori research laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Hohki, S; Ikeda, G

    1965-01-01

    Following up the construction in 1939 of an ehv research laboratory, another new research laboratory was established at Kumatori with a ground area of 142,000 square meters. As the first stage of this construction plan, the new research equipment was installed in November 1963 and began operation. The laboratory consists of comprehensive ehv research equipment and facilities relating to atomic energy. The former includes a 6000-kV impulse voltage generator, a 1650-kV alternating current testing transformer, a 300-m overhead transmission test line, a tower strength testing facility, and other various high-power test facilities. Studies on a 400- to 500-kV overhead power transmission system and other new transmission systems are currently being conducted. The details of the construction of the ehv research equipment together with the research policy for future ehv engineering are given.

  1. Harmful effects of lightning surge discharge on communications terminal equipments

    International Nuclear Information System (INIS)

    Liang, Sisi; Xu, Xiaoying; Tao, Zhigang; Dai, Yanling

    2013-01-01

    The interference problem of lightning surges on electronic and telecommunication products were examined, and a series of experiments were conducted to analyze the failure situations to find out the mechanisms of failures caused by the lightning surge. In addition, the ways in which lightning surges damaged equipment were deduced. It was found that failure positions were scattered and appeared in groups, and most of them were ground discharge. Internet access transformer had high withstand-voltage under the lightning pulse, and the lightning surge seldom passed through the internet access transformer. The lightning current can release to the ground via the computer network adapter of the terminal user. The study will help to improve the performance of lightning surge protection circuit and protection level.

  2. Impacts of post-mortem ageing prior to freezing on technological and oxidative properties of coarse ground lamb sausage in a model system

    Directory of Open Access Journals (Sweden)

    Juhui Choe

    2017-07-01

    Full Text Available Objective The objective of this study was to evaluate the effects of ageing time of lamb loins prior to freezing on technological characteristics and oxidation stability of coarse ground lamb loin sausage using in a model system. Methods Lamb loins (M. longissimus lumborum, n = 25 were aged at −1.5°C for 0, 1, 2, 3, and 8 wk and then frozen for the remaining days (a total of 30 wk. The aged/frozen/thawed lamb loins were ground, and model sausages were formulated with 75% aged/frozen/thawed lamb loin, 25% water, 1.5% sodium chloride (NaCl and 0.3% sodium tripolyphosphate. The pH and thaw/purge loss of aged/frozen/thawed lamb loins were evaluated, and protein functionality (protein solubility and emulsifying capacity, water-holding capacity and textural properties of model sausages were determined. Cooked model sausages were vacuum-packaged in a plastic bag and displayed under continuous fluorescent natural white light (3°C±1°C. Colour and lipid oxidation of the cooked model sausages were evaluated on 0 and 21 d of display storage. Results Ageing prior to freezing had no impact on pH and purge/thaw loss of lamb loins and the colour of cooked sausages (p>0.05 made from the loins. Lamb loins aged for at least 3 wk prior to freezing numerically improved total and myofibrillar protein solubilities (p>0.05 and emulsion activity index (p = 0.009 of meat batter, but decreased cooking loss (p = 0.003 and lipid oxidation (p<0.05 of model sausages. Conclusion This study suggests that post-mortem ageing of raw meat prior to freezing could improve water-holding capacity and lipid oxidative stability of sausage made from the meat.

  3. Impacts of post-mortem ageing prior to freezing on technological and oxidative properties of coarse ground lamb sausage in a model system.

    Science.gov (United States)

    Choe, Juhui; Kim, Hyun-Wook; Farouk, Mustafa M; Brad Kim, Yuan H

    2017-07-01

    The objective of this study was to evaluate the effects of ageing time of lamb loins prior to freezing on technological characteristics and oxidation stability of coarse ground lamb loin sausage using in a model system. Lamb loins ( M. longissimus lumborum , n = 25) were aged at -1.5°C for 0, 1, 2, 3, and 8 wk and then frozen for the remaining days (a total of 30 wk). The aged/frozen/thawed lamb loins were ground, and model sausages were formulated with 75% aged/frozen/thawed lamb loin, 25% water, 1.5% sodium chloride (NaCl) and 0.3% sodium tripolyphosphate. The pH and thaw/purge loss of aged/frozen/thawed lamb loins were evaluated, and protein functionality (protein solubility and emulsifying capacity), water-holding capacity and textural properties of model sausages were determined. Cooked model sausages were vacuum-packaged in a plastic bag and displayed under continuous fluorescent natural white light (3°C±1°C). Colour and lipid oxidation of the cooked model sausages were evaluated on 0 and 21 d of display storage. Ageing prior to freezing had no impact on pH and purge/thaw loss of lamb loins and the colour of cooked sausages (p>0.05) made from the loins. Lamb loins aged for at least 3 wk prior to freezing numerically improved total and myofibrillar protein solubilities (p>0.05) and emulsion activity index (p = 0.009) of meat batter, but decreased cooking loss (p = 0.003) and lipid oxidation (p<0.05) of model sausages. This study suggests that post-mortem ageing of raw meat prior to freezing could improve water-holding capacity and lipid oxidative stability of sausage made from the meat.

  4. Sensor equipment of the German earth scientific airplane program

    Science.gov (United States)

    Seige, P.

    1975-01-01

    The German airplane program for earth scientific research supports the work of a vast staff of earth scientists from universities and federal agencies. Due to their fields of interest, which are in oceanography, hydrology, geology, ecology, and forestry, five test areas were selected which are spread all over Germany. The sensor package, which was designed in accordance with the requirements of this group of scientists, will be installed in a DO 28 D2 type airplane. The sensor equipment consists of a series of 70-mm cameras having different film/filter combinations, a photogrammetric camera, an infrared radiometer, an 11-channel multispectral line scanner, a LANDSAT-compatible radiometer, and a complex avionic system. Along with the airplane, a truck will be equipped with a set of radiometers and other sensor devices for extensive ground-truth measurement; this also includes a cherry picker.

  5. Ground assessment methods for nuclear power plant

    International Nuclear Information System (INIS)

    1985-01-01

    It is needless to say that nuclear power plant must be constructed on the most stable and safe ground. Reliable assessment method is required for the purpose. The Ground Integrity Sub-committee of the Committee of Civil Engineering of Nuclear Power Plant started five working groups, the purpose of which is to systematize the assessment procedures including geological survey, ground examination and construction design. The works of working groups are to establishing assessment method of activities of faults, standardizing the rock classification method, standardizing assessment and indication method of ground properties, standardizing test methods and establishing the application standard for design and construction. Flow diagrams for the procedures of geological survey, for the investigation on fault activities and ground properties of area where nuclear reactor and important outdoor equipments are scheduled to construct, were established. And further, flow diagrams for applying investigated results to design and construction of plant, and for determining procedure of liquidification nature of ground etc. were also established. These systematized and standardized methods of investigation are expected to yield reliable data for assessment of construction site of nuclear power plant and lead to the safety of construction and operation in the future. In addition, the execution of these systematized and detailed preliminary investigation for determining the construction site of nuclear power plant will make much contribution for obtaining nation-wide understanding and faith for the project. (Ishimitsu, A.)

  6. GES [Ground Engineering System] test site preparation

    International Nuclear Information System (INIS)

    Cox, C.M.; Mahaffey, M.K.; Miller, W.C.; Schade, A.R.; Toyoda, K.G.

    1987-10-01

    Activities are under way at Hanford to convert the 309 containment building and its associated service wing to a nuclear test facility for the Ground Engineering System (GES) test. Conceptual design is about 80% complete, encompassing facility modifications, a secondary heat transport system, a large vacuum system, a test article cell and handing system, control and data handling systems, and safety andl auxiliary systems. The design makes extensive use of existing equipment to minimize technical risk and cost. Refurbishment of this equipment is 25% complete. Cleanout of some 1000 m 3 of equipment from the earlier reactor test in the facility is 85% complete. An Environmental Assessment was prepared and revised to incorporate Department of Energy (DOE) comments. It is now in the DOE approval chain, where a Finding of No Significant Impact is expected. During the next year, definite design will be well advanced, long-lead procurements will be initiated, construction planning will be completed, an operator training plan will be prepared, and the site (preliminary) safety analysis report will be drafted

  7. Eyes On the Ground: Year 2 Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    Brost, Randolph; Little, Charles Q.; McDaniel, Michael; McLendon, William C.,; Wade, James Rokwel

    2018-03-01

    The goal of the Eyes On the Ground project is to develop tools to aid IAEA inspectors. Our original vision was to produce a tool that would take three-dimensional measurements of an unknown piece of equipment, construct a semantic representation of the measured object, and then use the resulting data to infer possible explanations of equipment function. We report our tests of a 3-d laser scanner to obtain 3-d point cloud data, and subsequent tests of software to convert the resulting point clouds into primitive geometric objects such as planes and cylinders. These tests successfully identified pipes of moderate diameter and planar surfaces, but also incurred significant noise. We also investigated the IAEA inspector task context, and learned that task constraints may present significant obstacles to using 3-d laser scanners. We further learned that equipment scale and enclosing cases may confound our original goal of equipment diagnosis. Meanwhile, we also surveyed the rapidly evolving field of 3-d measurement technology, and identified alternative sensor modalities that may prove more suitable for inspector use in a safeguards context. We conclude with a detailed discussion of lessons learned and the resulting implications for project goals. Approved for public release; further dissemination unlimited.

  8. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment; El och kontrollutrustning i kaernkraftverk - Problematik vid utbyte av aaldrad utrustning

    Energy Technology Data Exchange (ETDEWEB)

    Nordling, Anna; Haakansson, Goeran

    2012-11-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  9. A Study on Performance and Safety Tests of Electrosurgical Equipment.

    Science.gov (United States)

    Tavakoli Golpaygani, A; Movahedi, M M; Reza, M

    2016-09-01

    Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient's safety and management of the risks associated with the use of high and low frequency electrical currents on human body. The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public) was evaluated in one of the provinces of Iran according to international and national standards. The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  10. Practical Approach on Lightning and Grounding Protection System

    OpenAIRE

    Shan Jose Varghese

    2015-01-01

    Lightning Protection and Grounding of Electrical and Mechanical equipment’s for the Protection of the Human Beings, Structure of the building and equipment protection, safe working of the Worker at Industry as per my latest practical knowledge in the site environment in extreme climatic condition of low lying areas of the Gulf Region in the challenging projects. All the conductor calculation, Lightning Risk Factor calculations, all the system information regarding the ...

  11. Management of ageing of I and C equipment in nuclear power plants. Report prepared within the framework of the International Working Group on Nuclear Power Plant Control and Instrumentation

    International Nuclear Information System (INIS)

    2000-06-01

    Experience has shown that ageing and obsolescence have the potential to cause the maintainability and operability of many instrumentation and control (I and C) systems to deteriorate well before the end of plant life. An I and C ageing management strategy is therefore required to control and minimize this threat. This report gives guidance on how to develop such a strategy and provides examples and supporting information on how established and recently developed maintenance, surveillance, and testing techniques may be employed to support the strategy. In some cases, equipment refurbishment may be necessary and guidance on this subject is given in a companion publication (IAEA-TECDOC-1016, Modernization of Instrumentation and Control in Nuclear Power Plants, IAEA, Vienna, 1998). The International Working Group on Nuclear Power Plant Control and Instrumentation (IWG-NPPCI) of the IAEA proposed in 1995 that a technical report be prepared to provide general guidelines on the management of ageing of important I and C equipment in nuclear power plants. The purpose of the report would be to guide the worldwide nuclear industry on potential effects of I and C ageing on plant safety and economy, and the means that are available to help minimize or eliminate any detrimental consequences of ageing. In response, a consultants meeting of five experts from Finland, France, Germany, the United Kingdom and the USA was held by the IAEA in Vienna in September 1997 to exchange national experience on the subject and to discuss the possible content of the report. The group of experts was tasked with bringing together all the information that is available on I and C ageing and ageing management methods. After a thorough discussion and analysis of the available information, an extended outline of the report on the subject was produced. The purpose of the extended outline was to identify a structure of the report, bring together information available at the moment and to provide guidance

  12. AMS-C14 analysis of graphite obtained with an Automated Graphitization Equipment (AGE III) from aerosol collected on quartz filters

    Energy Technology Data Exchange (ETDEWEB)

    Solís, C.; Chávez, E.; Ortiz, M.E.; Andrade, E. [Instituto de Física, Universidad Nacional Autónoma de México, 04510 México D.F. (Mexico); Ortíz, E. [Universidad Autónoma Metropolitana, Unidad Azcapotzalco, México D.F. (Mexico); Szidat, S. [Department of Chemistry and Biochemistry, University of Bern, Freiestrasse 3, CH-3012 Bern (Switzerland); Paul Scherrer Institut (PSI), CH-5232 Villigen (Switzerland); Wacker, L. [Laboratory of Ion Physics, ETH, Honggerberg, Zurich (Switzerland)

    2015-10-15

    AMS-{sup 14}C applications often require the analysis of small samples. Such is the case of atmospheric aerosols where frequently only a small amount of sample is available. The ion beam physics group at the ETH, Zurich, has designed an Automated Graphitization Equipment (AGE III) for routine graphite production for AMS analysis from organic samples of approximately 1 mg. In this study, we explore the potential use of the AGE III for graphitization of particulate carbon collected in quartz filters. In order to test the methodology, samples of reference materials and blanks with different sizes were prepared in the AGE III and the graphite was analyzed in a MICADAS AMS (ETH) system. The graphite samples prepared in the AGE III showed recovery yields higher than 80% and reproducible {sup 14}C values for masses ranging from 50 to 300 μg. Also, reproducible radiocarbon values were obtained for aerosol filters of small sizes that had been graphitized in the AGE III. As a study case, the tested methodology was applied to PM{sub 10} samples collected in two urban cities in Mexico in order to compare the source apportionment of biomass and fossil fuel combustion. The obtained {sup 14}C data showed that carbonaceous aerosols from Mexico City have much lower biogenic signature than the smaller city of Cuernavaca.

  13. An experimental investigation on ground heat flow balance issue for a GCHP

    OpenAIRE

    Jiufa Chen; Hongqi Zheng; Qin Xue; Erming An; Weilai Qiao

    2010-01-01

    For a ground-coupled heat pump (GCHP), it is vital to keep the ground heat flow balanced in order to achieve sustainable energy-saving operation. However, the importance of this issue has not been well studied. Focused on the heat flow balance issue, this paper made an exclusive experimental study using a newly installed GCHP system with the designed cooling capacity 1960 kW and heating capacity 1590 kW. The GCHP system was equipped with a data acquisition system and had temperature sensors i...

  14. A guide to qualification of electrical equipment for nuclear power plants. Final report, November 1983

    International Nuclear Information System (INIS)

    Marion, A.; Lamken, D.; Harrall, T.; Kasturi, S.; Holzman, P.; Carfagno, S.; Thompson, D.; Boyer, B.; Hanneman, H.; Rule, W.

    1983-09-01

    Equipment qualification demonstrates that nuclear power plant equipment can perform its safety function - that despite age or the adverse conditions of a design basis accident the equipment can work as needed. This report is a guide to the overall process of electrical equipment qualification. It should interest those who design such equipment, those who buy it, or test it, and even those who install and maintain it. (author)

  15. 14 CFR 121.360 - Ground proximity warning-glide slope deviation alerting system.

    Science.gov (United States)

    2010-01-01

    ... deviation alerting system. 121.360 Section 121.360 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Equipment Requirements § 121.360 Ground proximity warning-glide slope deviation alerting system. (a) No... system that meets the performance and environmental standards of TSO-C92 (available from the FAA, 800...

  16. Soil respiration and photosynthetic uptake of carbon dioxide by ground-cover plants in four ages of jack pine forest

    Science.gov (United States)

    Striegl, Robert G.; Wickland, K.P.

    2001-01-01

    Soil carbon dioxide (CO2) emission (soil respiration), net CO2 exchange after photosynthetic uptake by ground-cover plants, and soil CO2 concentration versus depth below land surface were measured at four ages of jack pine (Pinus banksiana Lamb.) forest in central Saskatchewan. Soil respiration was smallest at a clear-cut site, largest in an 8-year-old stand, and decreased with stand age in 20-year-old and mature (60-75 years old) stands during May-September 1994 (12.1, 34.6, 31.5, and 24.9 mol C??m-2, respectively). Simulations of soil respiration at each stand based on continuously recorded soil temperature were within one standard deviation of measured flux for 48 of 52 measurement periods, but were 10%-30% less than linear interpolations of measured flux for the season. This was probably due to decreased soil respiration at night modeled by the temperature-flux relationships, but not documented by daytime chamber measurements. CO2 uptake by ground-cover plants ranged from 0 at the clear-cut site to 29, 25, and 9% of total growing season soil respiration at the 8-year, 20-year, and mature stands. CO2 concentrations were as great as 7150 ppmv in the upper 1 m of unsaturated zone and were proportional to measured soil respiration.

  17. Evaluation and planning for lightning rod grounding of PSTA cyclotron building

    International Nuclear Information System (INIS)

    Suyamto; Taufik; Idrus Abdul Kudus

    2015-01-01

    Lightning rod connected with the ground resistance is an equipment protection against hazards of lightning strikes building. Lightning strike to the building may result in damage to the building and destroy all the equipment inside it. The need for a lightning rod of a building is regulated in PUIPP expressed with risk factors (FR). The amount of FR is the sum of the value of the index of five (5 ) components of the building i.e building functions, construction, the height and the situation of the building and and the number of yearly lightning days in that places. At this time 05 PSTA building has undergone changes in the function of the building's mechanical workshop into a cyclotron building so that safety criteria also change into vital building with lightning rods resistance have to < 1 Ω. From measurements of grounding resistant which exist at present known that average Rp is 1.26 Ω so it is necessary to install new additional grounding resistance to reduce being less than 1 Ω. To fulfil this and taking into consideration the cost and ease of installation, planned addition of a grounding using electrodes solid rods of copper, a diameter of 16 mm and a length of 4 m , planted the soil water depth of 12 m, as well as clay covering, with a water content of about 30 %. Under these conditions and taking into the cost and ease of installation are expected to obtain optimal results i.e. soil resistivity 18.35 Ω-m and its resistance of Rx 4.82 Ω. When coupled with existing grounding final resistant Rp 0.99 Ω obtained is thus fulfilling the requirements of PUIPP that is less than 1 Ω. (author)

  18. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  19. Safety Analysis of 'Older/Aged' Handling and Transportation Equipment for Heavy Loads, Radioactive Waste and Materials in Accordance with German Nuclear Standards KTA 3902, 3903 and 3905

    International Nuclear Information System (INIS)

    Macias, P.; Prucker, E.; Stang, W.

    2006-01-01

    The purpose of this paper is to present a general safety analysis of important handling and transportation processes and their related equipment ('load chains' consisting of cranes, load-bearing equipment and load-attaching points). This project was arranged by the responsible Bavarian ministry for environment, health and consumer protection (StMUGV) in agreement with the power plant operators of all Bavarian nuclear power plants to work out potential safety improvements. The range of the equipment (e.g. reactor building, crane, refuelling machine, load-bearing equipment and load-attaching points) covers the handling and transportation of fuel elements (e. g. with fuel flasks), heavy loads (e.g. reactor pressure vessel closure head, shielding slabs) and radioactive materials and waste (e.g. waste flasks, control elements, fuel channels, structure elements). The handling equipment was subjected to a general safety analysis taking into account the ageing of the equipment and the progress of standards. Compliance with the current valid requirements of the state of science and technology as required by German Atomic Act and particularly of the nuclear safety KTA-standards (3902, 3903 and 3905) was examined. The higher protection aims 'safe handling and transportation of heavy loads and safe handling of radioactive materials and waste' of the whole analysis are to avoid a criticality accident, the release of radioactivity and inadmissible effects on important technical equipment and buildings. The scope of the analysis was to check whether these protection aims were fulfilled for all important technical handling and transportation processes. In particularly the design and manufacturing of the components and the regulations of the handling itself were examined. (authors)

  20. Farm Equipment Leasing. A New Financial Strategy. Staff Report No. AGES870302.

    Science.gov (United States)

    Serletis, William S.

    For farmers with high debt/asset ratios, leasing is an attractive option for securing the use of farm machinery. Under the current tax laws, financial leasing carries lower after-tax costs than loan purchasing. By size, farms with more than $500,000 in sales had the highest proportion of U.S. expenditures for farm equipment leasing. By region, the…

  1. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  2. Ground Shock Resistant of Buried Nuclear Power Plant Facility

    International Nuclear Information System (INIS)

    Ornai, D.; Adar, A.; Gal, E.

    2014-01-01

    Nuclear Power Plant (NPP) might be subjected to hostile attacks such as Earth Penetrating Weapons (EPW) that carry explosive charges. Explosions of these weapons near buried NPP facility might cause collapse, breaching, spalling, deflection, shear, rigid body motion (depending upon the foundations), and in-structure shock. The occupants and the equipment in the buried facilities are exposed to the in-structure motions, and if they are greater than their fragility values than occupants might be wounded or killed and the equipment might be damaged, unless protective measures will be applied. NPP critical equipment such as pumps are vital for the normal safe operation since it requires constant water circulation between the nuclear reactor and the cooling system, including in case of an immediate shut down. This paper presents analytical- semi empirical formulation and analysis of the explosion of a penetrating weapon with a warhead of 100kgs TNT (Trinitrotoluene) that creates ground shock effect on underground NPP structure containing equipment, such as a typical pump. If the in-structure spectral shock is greater than the pump fragility values than protective measures are required, otherwise a real danger to the NPP safety might occur

  3. Evaluation of the Aircraft Ground Equipment (AGE) at Pacific Air Force (PACAF) Locations

    Science.gov (United States)

    2018-01-16

    Dothideomycetes Often found as pathogens, endophytes, or epiphytes of living plants ; also degrades cellulose and other complex carbohydrates. Several...typically varies from 57°F to 89°F and is rarely below 49°F or above 92°F. The total daily incident shortwave solar energy reaching the surface of the...windy; and it is partly cloudy year-round. Over the course of the year, the temperature typically varies from 24°F to 87°F and is rarely below 15

  4. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  5. Multisensor Equipped Uav/ugv for Automated Exploration

    Science.gov (United States)

    Batzdorfer, S.; Bobbe, M.; Becker, M.; Harms, H.; Bestmann, U.

    2017-08-01

    The usage of unmanned systems for exploring disaster scenarios has become more and more important in recent times as a supporting system for action forces. These systems have to offer a well-balanced relationship between the quality of support and additional workload. Therefore within the joint research project ANKommEn - german acronym for Automated Navigation and Communication for Exploration - a system for exploration of disaster scenarios is build-up using multiple UAV und UGV controlled via a central ground station. The ground station serves as user interface for defining missions and tasks conducted by the unmanned systems, equipped with different environmental sensors like cameras - RGB as well as IR - or LiDAR. Depending on the exploration task results, in form of pictures, 2D stitched orthophoto or LiDAR point clouds will be transmitted via datalinks and displayed online at the ground station or will be processed in short-term after a mission, e.g. 3D photogrammetry. For mission planning and its execution, UAV/UGV monitoring and georeferencing of environmental sensor data, reliable positioning and attitude information is required. This is gathered using an integrated GNSS/IMU positioning system. In order to increase availability of positioning information in GNSS challenging scenarios, a GNSS-Multiconstellation based approach is used, amongst others. The present paper focuses on the overall system design including the ground station and sensor setups on the UAVs and UGVs, the underlying positioning techniques as well as 2D and 3D exploration based on a RGB camera mounted on board the UAV and its evaluation based on real world field tests.

  6. MULTISENSOR EQUIPPED UAV/UGV FOR AUTOMATED EXPLORATION

    Directory of Open Access Journals (Sweden)

    S. Batzdorfer

    2017-08-01

    Full Text Available The usage of unmanned systems for exploring disaster scenarios has become more and more important in recent times as a supporting system for action forces. These systems have to offer a well-balanced relationship between the quality of support and additional workload. Therefore within the joint research project ANKommEn – german acronym for Automated Navigation and Communication for Exploration – a system for exploration of disaster scenarios is build-up using multiple UAV und UGV controlled via a central ground station. The ground station serves as user interface for defining missions and tasks conducted by the unmanned systems, equipped with different environmental sensors like cameras – RGB as well as IR – or LiDAR. Depending on the exploration task results, in form of pictures, 2D stitched orthophoto or LiDAR point clouds will be transmitted via datalinks and displayed online at the ground station or will be processed in short-term after a mission, e.g. 3D photogrammetry. For mission planning and its execution, UAV/UGV monitoring and georeferencing of environmental sensor data, reliable positioning and attitude information is required. This is gathered using an integrated GNSS/IMU positioning system. In order to increase availability of positioning information in GNSS challenging scenarios, a GNSS-Multiconstellation based approach is used, amongst others. The present paper focuses on the overall system design including the ground station and sensor setups on the UAVs and UGVs, the underlying positioning techniques as well as 2D and 3D exploration based on a RGB camera mounted on board the UAV and its evaluation based on real world field tests.

  7. Adding Theoretical Grounding to Grounded Theory: Toward Multi-Grounded Theory

    OpenAIRE

    Göran Goldkuhl; Stefan Cronholm

    2010-01-01

    The purpose of this paper is to challenge some of the cornerstones of the grounded theory approach and propose an extended and alternative approach for data analysis and theory development, which the authors call multi-grounded theory (MGT). A multi-grounded theory is not only empirically grounded; it is also grounded in other ways. Three different grounding processes are acknowledged: theoretical, empirical, and internal grounding. The authors go beyond the pure inductivist approach in GT an...

  8. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  9. A Study on Performance and Safety Tests of Electrosurgical Equipment

    Directory of Open Access Journals (Sweden)

    Tavakoli Golpaygani A.

    2016-09-01

    Full Text Available Introduction: Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient’s safety and management of the risks associated with the use of high and low frequency electrical currents on human body. Material and Methods: The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public was evaluated in one of the provinces of Iran according to international and national standards. Results: The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Conclusion: Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  10. Unsolved problems in applying U.S. regulatory guides to control system equipment

    International Nuclear Information System (INIS)

    Stade, R.E.

    1978-01-01

    Two current problems encountered when designing control systems to the United States Regulatory Guide requirements are discussed. They are: 1) Level of surge voltages that should be specified when procuring solid state control and instrumentation systems and equipment. 2) The approach to be used qualifying equipment that must meet the aging requirements. (author)

  11. T-SDN architecture for space and ground integrated optical transport network

    Science.gov (United States)

    Nie, Kunkun; Hu, Wenjing; Gao, Shenghua; Chang, Chengwu

    2015-11-01

    Integrated optical transport network is the development trend of the future space information backbone network. The space and ground integrated optical transport network(SGIOTN) may contain a variety of equipment and systems. Changing the network or meeting some innovation missions in the network will be an expensive implement. Software Defined Network(SDN) provides a good solution to flexibly adding process logic, timely control states and resources of the whole network, as well as shielding the differences of heterogeneous equipment and so on. According to the characteristics of SGIOTN, we propose an transport SDN architecture for it, with hierarchical control plane and data plane composed of packet networks and optical transport networks.

  12. Estimation of ground reaction forces and moments during gait using only inertial motion capture

    NARCIS (Netherlands)

    Karatsidis, Angelos; Bellusci, Giovanni; Schepers, H. Martin; de Zee, Mark; Andersen, Michael S.; Veltink, Petrus H.

    Ground reaction forces and moments (GRF&M) are important measures used as input in biomechanical analysis to estimate joint kinetics, which often are used to infer information for many musculoskeletal diseases. Their assessment is conventionally achieved using laboratory-based equipment that cannot

  13. Practices of prolongation of the I and C equipment lifetime

    International Nuclear Information System (INIS)

    Samoylov, O.B.; Pronin, V.S.; Savelov, I.D.; Bogomazov, V.A.; Drumov, V.V.; Chudin, A.G.

    2000-01-01

    The lifetime of nuclear power plants (NPP) always exceeds the operational time of Instrumentation and Control (I and C) systems. Ageing of I and C equipment in NPPs have many aspects. Research of these aspects is being performed in OKB Mechanical Engineering. Under condition of fast development of I and C systems and applying more stringent safety requirements, modernization of the equipment irrespective of its operational condition is getting important. However, an equipment of I and C systems operated in Russia was designed and manufactured applying highest requirements for a reliability of their work during its whole operational time. Therefore, in many cases it is not necessary to replace them in spite of expiration of their specified lifetime. During operation this equipment is maintained in a proper operation condition by a special service procedures stipulated by its development. When the equipment lifetime approaches to its end, lifetime extension for the certain period should be considered. (author)

  14. Development and testing of techniques for in-ground stabilization, size reduction, and safe removal of radioactive wastes stored in containments buried in ground

    International Nuclear Information System (INIS)

    Halliwell, Stephen; Christodoulou, Apostolos

    2013-01-01

    Since the 1950's radioactive wastes from a number of laboratories have been stored below ground at the Hanford site, Washington State, USA, in vertical pipe units (VPUs) made of five 200 litre drums without tops or bottoms, and in caissons, made out of corrugated pipe, or concrete and typically 2,500 mm in diameter. The VPU's are buried of the order of 2,100 mm below grade, and the caissons are buried of the order of 6,000 mm below grade. The waste contains fuel pieces, fission products, and a range of chemicals used in the laboratory processes. This can include various energetic reactants such as un-reacted sodium potassium (NaK), potassium superoxide (KO 2 ), and picric acid, as well as quantities of other liquids. The integrity of the containments is considered to present unacceptable risks from leakage of radioactivity to the environment. This paper describes the successful development and full scale testing of in-ground augering equipment, grouting systems and removal equipment for remediation and removal of the VPUs, and the initial development work to test the utilization of the same basic augering and grouting techniques for the stabilization, size reduction and removal of caissons. (authors)

  15. Evaluation of stability of foundation ground during earthquake, (1)

    International Nuclear Information System (INIS)

    Nishi, Koichi; Kanatani, Mamoru; Matsui, Ietaka; Touma, Jun-ichi

    1986-01-01

    The Central Research Institute of Electric Power Industry has advanced the research on the new location technology for nuclear power stations in order to cope with the lack of sites expected in near future. The sites on rock mass are usually used for nuclear power stations, but the location on quaternary ground, particularly on gravel ground, is one of such new technology, to which attention has been paid. It has been pointed out that this location has the advantage in the earthquake response of reactor buildings and equipment, and the prospect to ensure the stability by lowering underground water level and pile penetration has been obtained, therefore, the possibility of its realization is high. At present, the research aiming at the establishment of the method of evaluating foundation ground stability is in progress, and it is expected that the quantitative evaluation means for the aseismatic stability of quaternary ground is obtained. In this paper, the analysis techniques for forecasting the amount of subsidence at the time of earthquakes occurring accompanying the generation of excessive pore water pressure and its disappearance are reported. Also the applicability of the forecasting techniques was experimentally verified. (Kako, I.)

  16. Seismic response and rehabilitation of critical substation equipment

    Energy Technology Data Exchange (ETDEWEB)

    Saadeghvaziri, M.A.; Allaverdi, N.H. [New Jersey Inst. of Technology, Newark, NJ (United States); Ashrafi, A. [Columbia Univ., New York, NY (United States); Ersoy, S. [Greenman-Pedersen Inc., Babylon, NY (United States)

    2004-07-01

    Substations are one of the most important components of an electrical power system. They provide protection to transmission and distribution lines and transfer power between different voltage levels. Transformers and bushings within the substation are vulnerable to earthquake ground motion. It is extremely important that electric power systems remain functional following seismic damage. This study assessed the seismic response of critical substation equipment and described advanced technologies for rehabilitation measures such as the Friction Pendulum System (FPS). It presents the results of an extensive finite element analysis on response of transformers and bushings. The objective was to determine the seismic behaviour of transformers and bushings during an earthquake and to determine the probability of different failure modes. The response of an FPS isolated transformer to different earthquakes was also examined along with FPS radii, ground motion intensity and vertical excitations. A finite element model was developed for FPS. The study showed that seismic isolation is a viable mitigation strategy, but a modest increase in slack must be provided. 15 refs., 1 tab., 12 figs.

  17. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  18. Web-Altairis: An Internet-Enabled Ground System

    Science.gov (United States)

    Miller, Phil; Coleman, Jason; Gemoets, Darren; Hughes, Kevin

    2000-01-01

    This paper describes Web-Altairis, an Internet-enabled ground system software package funded by the Advanced Automation and Architectures Branch (Code 588) of NASA's Goddard Space Flight Center. Web-Altairis supports the trend towards "lights out" ground systems, where the control center is unattended and problems are resolved by remote operators. This client/server software runs on most popular platforms and provides for remote data visualization using the rich functionality of the VisAGE toolkit. Web-Altairis also supports satellite commanding over the Internet. This paper describes the structure of Web-Altairis and VisAGE, the underlying technologies, the provisions for security, and our experiences in developing and testing the software.

  19. Annual report of the group for maintenance of electronic equipment

    International Nuclear Information System (INIS)

    Popovic, B.

    1965-01-01

    Maintenance and repair of the RA reactor control and safety systems were uniformly distributed during the whole year and were done according to the annual plan. A series of repairs of he electronic equipment as well as exchange of electronic components and elec tonic tubes. The testing and calibration of control and protection circuits were done regularly according to the needs and operation state of the reactor and according to the instructions. Inspections, repairs and reconstructions well as operating characteristics of individual elements as well as complete electronic circuits during 1965 have shown da the systems of control and safety are still in good condition. Somewhat higher number of failures due to aging of electronic tubes is a regular consequence of equipment and instrumentation aging [sr

  20. Good practices for effective maintenance to manage aging at NPPs

    International Nuclear Information System (INIS)

    Scott, W.B.; Enderlin, W.I.; Levy, I.S.

    1989-01-01

    The Nuclear Regulatory Commission's Office of Nuclear Regulatory Research is sponsoring this effort to study maintenance as it relates to aging, under the Nuclear Plant Aging Research (NPAR). Maintenance is the primary means of combating and correcting the effects of aging degradation at nuclear power plants. Maintenance effectiveness directly affects the safety of nuclear power plants. Several recent plant events have shown that improper maintenance or a lack of maintenance can be a significant contributory cause of plant incidents (e.g., transients at Rancho Seco and Davis Besse, and the Salem anticipated transient without scram event). In these, and other events, safety related plant equipment functions have been impaired by poor maintenance practices or a lack of maintenance on the specific equipment or in ancillary equipment that affects the ability of the safety related equipment to function. In some cases, the ancillary equipment has been nonsafety-related equipment, or balance-of-plant equipment that has not received adequate maintenance attention. In addition to the potential for causing safety significant plant transients, poor or lacking maintenance may allow the licensing basis of the plant to be eroded without detection. In some cases, time-related aging degradation of equipment that has not been detected, corrected or managed by the maintenance program has been a significant contributory factor. The NPAR program has developed significant information on aging degradation, detection, mitigation, and correction practices for safety-significant structures, systems and components that can be factored into maintenance programs and their effectiveness

  1. The Design and Experiment of the Track-Type Equipment for Feeding Dairy Cows

    Directory of Open Access Journals (Sweden)

    Yaping LI

    2014-06-01

    Full Text Available As one of the effective ways of reducing the cost and increase the revenue, feeding dairy cows with individual precision in quantity could further develop the production potential of high- yield dairy cows and improve the milk yield of every dairy cow. Therefore, based on three kinds of technologies of radio frequency identification technology, wireless transmission technology and infrared technology and grounded on the foundation of previous studies, this thesis has completed the track- type equipment for feeding dairy cows with individual precision in quantity. The equipment takes the computer as the information management platform, adopts the singly chip microcomputer as the control platform, uses the wireless module and U disk to conduct the transmission of individual feeding data of dairy cows and guides the whole process with the track. This kind of equipment could advance automatically, identify and feed dairy cows precisely during the feeding process. This thesis also designs the matching feeding technology of the equipment, and accomplishes the test of feeding outside the cowshed, which takes “TMR + precise feeding with concentrated feed” as the feeding model, so that the feeding process could be more effective and further steady.

  2. Colloid Detection in Natural Ground Water from Ruprechtov by Laser-Induced Breakdown Detection

    Energy Technology Data Exchange (ETDEWEB)

    Hauser, W.; Geckeis, H.; Goetz, R. [FZK - Inst. fuer Nukleare Entsorgung, Ka rlsruhe (Germany)]. e-mail: hauser@ine.fzk.de; Noseck, U. [Gesellschaft fuer Anlagen- und Reaktorsicherheit, D-38122 Braunschweig (Germany); Laciok, A. [Nuclear Research Inst. Rez plc, Waste and Environmental Management Dept., Husinec-Rez, PSC 250 68 (Czech Republic)

    2007-06-15

    A borehole ground water sampling system and a mobile laser-induced breakdown detection (LIBD) equipment for colloid detection combined with a geomonitoring unit have been applied to characterize the natural background colloid concentration in ground waters of the Ruprechtov natural analogue site (Czech Republic). Ground water has been sampled using steel cylinders. To minimize artifacts during ground water sampling the contact to atmospheric oxygen has been excluded. The ground water samples collected in this way are transported to the laboratory where they have been connected to a series of flow-through detection cells. Argon gas is used to press the ground water through these detection cells for colloid analysis (LIBD), pH, Eh, electrical conductivity and oxygen content. After the above mentioned analysis additional samples are taken for chemical analysis by ICP-AES, ICP-MS, IC- and DOC-detection. Our data obtained by in-situ- and laboratory- measurements point out that the natural colloid concentration found at the Ruprechtov site is a strong function of the ground water ionic strength. The LIBD determined natural background colloid concentrations found at Ruprechtov are compared with data of studies performed in Aespoe (Sweden) and Grimsel (Switzerland)

  3. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  4. Utilization of balance equipment in windsurf beginners off water training.

    OpenAIRE

    Frič, Čestmír

    2013-01-01

    Work name: Utilization of balance equipment in windsurf beginners off water training. Aim of work: To determin and evaluate significance of balance equipment in off water training. Method: The method of comparative experiment have been used in this thesis. Than the obtained data were evaluated. It was nessesary to create and compare two groups of people, compound of young healthy individuals in the age 20 - 30 both male and female. The only condition for the research was their zero experience...

  5. Ground-based forest harvesting effects on soil physical properties and Douglas-fir growth.

    Science.gov (United States)

    Adrian Ares; Thomas A. Terry; Richard E. Miller; Harry W. Anderson; Barry L. Flaming

    2005-01-01

    Soil properties and forest productivity can be affected by heavy equipment used for harvest and site preparation but these impacts vary greatly with site conditions and operational practices. We assessed the effects of ground-based logging on soil physical properties and subsequent Douglas-fir [Pseudotsuga menziesii (Mirb) Franco] growth on a highly...

  6. The effect of high-frequency ground motion on the MAPLE-X10 reactor

    International Nuclear Information System (INIS)

    Bhan, S.; Dunbar, S.

    1989-06-01

    The effect of high-frequency ground motion on structures and equipment in nuclear reactors is examined by subjecting simple linear models to selected recorded ground motions which exhibit low and high frequencies. Computed damage measures indicate that high-frequency short-duration ground motion, such as that observed in eastern North America, have a minimal effect on structures with low natural frequencies. Response spectra of high-frequency ground motion indicate that higher forces are induced in structures with high natural frequencies as compared to those induced by low-frequency ground motion. However, reported observations of earthquake damage in eastern North America suggest that high-frequency ground motion causes little of no damage to structures. This may be due to the energy absorption capability of structures. It is concluded that the response spectrum representative of ground motion observed in eastern North America may give an over-conservative measure of the response of structures with high natural frequencies, since it does not account for the typically observed short duration of high-frequency ground motion and for the energy absorption capability of structures. Detailed nonlinear analysis of specific structures with high natural frequencies should be performed to better predict the actual response. Recommendations for a nonlinear analysis of typical structures with high natural frequencies are made

  7. State of the Art in Input Ground Motions for Seismic Fragility and Risk Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jung Han; Choi, In Kil; Kim, Min Kyu [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    The purpose of a Seismic Probabilistic Safety Analysis (SPSA) is to determine the probability distribution of core damage due to the potential effects of earthquakes. The SPSA is performed based on four steps, a seismic hazard analysis, a component fragility evaluation, a plant system and accident sequence analysis, and a consequence analysis. There are very different spectrum shapes in every ground motions. The structural response and the seismic load applied to equipment are greatly influenced by a spectral shape of the input ground motion. Therefore the input ground motion need to be determined under the same assumption in risk calculation. Several technic for the determination of input ground motions has developed and reviewed in this study. In this research, the methodologies of the determination of input ground motion for the seismic risk assessment are reviewed and discussed. It has developed to reduce the uncertainty in fragility curves and to remove the conservatism in risk values.

  8. Status of aerial survey emergency preparedness and ground support equipment, calibration, and sensitivities

    International Nuclear Information System (INIS)

    Dahlstrom, T.S.

    1986-01-01

    During the course of EG and G Energy Measurements, Inc. history in aerial surveillance, the scope of response has broadened from routine surveys and accident response with aerial systems, to being prepared to respond to any radiological incident with aerial, ground mobile, and hand-held instrumentation. The aerial survey system presently consists of four MBB BO-105 helicopters outfitted with gamma pods and specialized navigation systems (MRS or URS) that allow the operator and pilot to fly well-defined survey lines. Minimum detectable activities (MDA) for various isotopes range from a few tenths of a mCi to 100 mCI for point sources and from 1 to 200 pCi/g for volume sources

  9. Equipment for functional testing of the ALADIN TXA pulsed laser head

    Science.gov (United States)

    Emanuele, Stucchi; Franco, Trespidi; Enzo, Nava

    2017-11-01

    It is described a measurement instrument, used as Optical Ground Support Equipment, capable of performing the characterization of a pulsed laser beam. The instrument was developed for the functional testing of the EQM and FMs of the ALADIN laser transmitter (TXA). The performed measurements are: beam shaping, M2 measurement, beam angular stability, energy and wavelength measurements, pulse duration, polarization, pulse shape and spectral characterization, optical frequency stability measurement. The measurement system can work in automatic mode performing several measurements and providing automatic report generation.

  10. An active heat tracer experiment to determine groundwater velocities using fiber optic cables installed with direct push equipment

    NARCIS (Netherlands)

    Bakker, M.; Caljé, R.; Schaars, F.; Van der Made, K.J.; De Haas, S.

    2015-01-01

    A new approach is developed to insert fiber optic cables vertically into the ground with direct push equipment. Groundwater temperatures may be measured along the cables with high spatial and temporal resolution using a Distributed Temperature Sensing system. The cables may be inserted up to depths

  11. Discovery Mondays: Transporting tonnes of equipment with millimetre precision

    CERN Multimedia

    2005-01-01

    Transporting huge, very heavy but also frequently fragile items at CERN often presents a real challenge. The task becomes even more challenging when it involves lowering huge LHC machine and detector components 100 metres below ground. The Laboratory's Transport Service uses various techniques and different types of transport and heavy handling equipment to perform these delicate operations. You will have an opportunity to find out more about how they do their job at the next Discovery Monday event. You will have a close encounter with the trailer used to transport the impressive 15 metre-long, 35-tonne dipole magnets. You will be able to install mock-up magnets in a beam line or test your skill using heavy handling equipment to carry out a most unusual fishing operation. You will be able to take a trip in a three-metre-high lorry and have a once-in-a-lifetime opportunity to operate a crane. You will also be able to take a test drive in the famous roll-over simulator vehicle. At the coming Discovery Monday...

  12. Oil alarm. Equipment and techniques for fire brigades for combatting spills of ground water pollutants. 3. rev. ed.

    International Nuclear Information System (INIS)

    Plattner, H.P.

    1993-01-01

    The little red book discusses liquid and liquefying substances that present a groundwater hazard, their occurrence, the hazards of spills, and the equipment and techniques required for combatting them. (orig.) [de

  13. Ground-water heat pumps: an examination of hydrogeologic, environmental, legal, and economic factors affecting their use

    Energy Technology Data Exchange (ETDEWEB)

    Armitage, D M; Bacon, D J; Massey-Norton, J T; Miller, J D

    1980-11-12

    Groundwater is attractive as a potential low-temperature energy source in residential space-conditioning applications. When used in conjuncton with a heat pump, ground water can serve as both a heat source (for heating) and a heat sink (for cooling). Major hydrogeologic aspects that affect system use include groundwater temperature and availability at shallow depths as these factors influence operational efficiency. Ground-water quality is considered as it affects the performance and life-expectancy of the water-side heat exchanger. Environmental impacts related to groundwater heat pump system use are most influenced by water use and disposal methods. In general, recharge to the subsurface (usually via injection wells) is recommended. Legal restrictions on system use are often stricter at the municipal and county levels than at state and Federal levels. Although Federal regulations currently exist, the agencies are not equipped to regulate individual, domestic installations. Computer smulations indicate that under a variety of climatologic conditions, groundwater heat pumps use less energy than conventional heating and cooling equipment. Life-cycle cost comparisons with conventional equipment depend on alternative system choices and well cost options included in the groundwater heat pump system.

  14. Investigation equipment and methods used by Posiva

    International Nuclear Information System (INIS)

    Oehberg, A.

    2006-10-01

    Posiva Oy, a company jointly owned by TVO and Fortum, submitted an application for the Decision in Principle to the Finnish Government in May 1999. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the Decision in Principle on the final disposal facility for spent nuclear fuel at Olkiluoto, Eurajoki in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground research facility, ONKALO, for rock characterisation for the final disposal of spent nuclear fuel will be constructed. The construction of the ONKALO access tunnel was started in September 2004. This report describes the investigation methods and equipment developed and used by Posiva Oy during the confirming site investigations from the surface. The report covers the areas of drilling of deep investigation holes, geophysical loggings, geophysical ground and tunnel surveys, hydrogeological and hydrogeochemical as well as rock mechanical methods. Emphasis is given on those equipment and methods developed by Posiva and those that have frequently and recently been used in the Posiva's characterisation programmes including methods applied during excavation of ONKALO access tunnel. The database used for the field investigation data is also briefly described in this report. (orig.)

  15. Development and Evaluation of the Stingray, an Amphibious Maritime Interdiction Operations Unmanned Ground Vehicle

    Science.gov (United States)

    2014-05-01

    include: • Size and weight: The robot should fit in a Modular Lightweight Load-carrying Equipment ( MOLLE ) pouch and weigh approximately 1.5 Kg. • Ground...volumetric envelope for the Stingray was determined by the requirement to fit in a MOLLE pouch. It had repercussions in terms of the wheelbase, width

  16. Testing of a naturally aged nuclear power plant inverter and battery charger

    International Nuclear Information System (INIS)

    Gunther, W.E.

    1988-09-01

    A naturally aged inverter and battery charger were obtained from the Shippingport facility. This equipment was manufactured in 1974, and was installed at Shippingport in 1975 as part of a major plant modification. Testing was performed on this equipment under the auspices of the NRC's Nuclear Plant Aging Research (NPAR) Program to evaluate the type and extent of degradation due to aging, and to determine the effectiveness of condition monitoring techniques which could be used to detect aging effects. Steady state testing was conducted over the equipment's entire operating range. Step load changes were also initiated in order to monitor the electrical response. During this testing, component temperatures were monitored and circuit waveforms analyzed. Results indicated that aging had not substantially affected equipment operation. On the other hand, when compared with original acceptance test data, the monitoring techniques employed were sensitive to changes in measurable component and equipment parameters indicating the viability of detecting degradation prior to catastrophic failure. 7 refs., 34 figs., 12 tabs

  17. Youngest radiocarbon age for Jefferson's ground sloth, Megalonyx jeffersonii (Xenarthra, Megalonychidae)

    DEFF Research Database (Denmark)

    Gregory McDonald, H.; Stafford, Thomas W.; Gnidovec, Dale M.

    2015-01-01

    A partial skeleton of the extinct ground sloth, Megalonyx jeffersonii, recovered from a farm near Millersburg, Ohio in 1890, was radiocarbon dated for the first time. The ungual dated is part of a skeleton mounted for exhibit at the Orton Geological Museum at Ohio State University and was the fir...

  18. Environmental qualification program of electric equipment for Angra 1

    Energy Technology Data Exchange (ETDEWEB)

    Muzitano, Grazielle F.; Justino, Marcelo C.; Silva, Marcos C., E-mail: grazi@eletronuclear.gov.br, E-mail: justino@eletronuclear.gov.br, E-mail: candeia@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)

    2017-11-01

    This paper describes the development of the environmental qualification program for important electrical equipment (EQPEE) used for safety in Angra 1 Nuclear Power Plant (NPP). The environmental qualification program started in United States of America by the Nuclear Regulatory Commission (NRC) after the Three Mile Island (TMI) Nuclear Power Plant Accident in 1979. In that event, some equipment installed inside the reactor containment of TMI failed due the harsh conditions that occurred after the accident. Because of this fact, the NRC issued the Regulation 50.49 'Environmental qualification of electric equipment important to safety for nuclear power plants'. The Brazilian regulatory commission CNEN also asked Angra 1 to follow this regulation and to implement an EQPEE similar to the programs adopted by American and other NPPs around the world. Due to the importance to maintain the critical equipment operating in normal and abnormal environment conditions, the program aims to assure that this equipment remains qualified to work under the harsh conditions found inside the reactor containment. The aging of these components are also analyzed in this program that is important in the process to extend the operating life of Angra 1 for more 20 years, which is normally referred as Long Term Operation (LTO). (author)

  19. Environmental qualification program of electric equipment for Angra 1

    International Nuclear Information System (INIS)

    Muzitano, Grazielle F.; Justino, Marcelo C.; Silva, Marcos C.

    2017-01-01

    This paper describes the development of the environmental qualification program for important electrical equipment (EQPEE) used for safety in Angra 1 Nuclear Power Plant (NPP). The environmental qualification program started in United States of America by the Nuclear Regulatory Commission (NRC) after the Three Mile Island (TMI) Nuclear Power Plant Accident in 1979. In that event, some equipment installed inside the reactor containment of TMI failed due the harsh conditions that occurred after the accident. Because of this fact, the NRC issued the Regulation 50.49 'Environmental qualification of electric equipment important to safety for nuclear power plants'. The Brazilian regulatory commission CNEN also asked Angra 1 to follow this regulation and to implement an EQPEE similar to the programs adopted by American and other NPPs around the world. Due to the importance to maintain the critical equipment operating in normal and abnormal environment conditions, the program aims to assure that this equipment remains qualified to work under the harsh conditions found inside the reactor containment. The aging of these components are also analyzed in this program that is important in the process to extend the operating life of Angra 1 for more 20 years, which is normally referred as Long Term Operation (LTO). (author)

  20. Robotic Ground-Penetrating-Radar (GPR) Surveys to Support the 2014 Greenland Inland Traverse

    Science.gov (United States)

    2016-06-01

    return via the same route to Thule in late May for over- winter equipment storage. The first 100 km of the route onto the main ice cap is ridden with...vehicle has a nominal ground pressure of 20 kPa through 0.51 m diameter all-terrain vehicle (ATV) tires . Yeti there- fore can drive safely over most

  1. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  2. Data Distribution System (DDS) and Solar Dynamic Observatory Ground Station (SDOGS) Integration Manager

    Science.gov (United States)

    Pham, Kim; Bialas, Thomas

    2012-01-01

    The DDS SDOGS Integration Manager (DSIM) provides translation between native control and status formats for systems within DDS and SDOGS, and the ASIST (Advanced Spacecraft Integration and System Test) control environment in the SDO MOC (Solar Dynamics Observatory Mission Operations Center). This system was created in response for a need to centralize remote monitor and control of SDO Ground Station equipments using ASIST control environment in SDO MOC, and to have configurable table definition for equipment. It provides translation of status and monitoring information from the native systems into ASIST-readable format to display on pages in the MOC. The manager is lightweight, user friendly, and efficient. It allows data trending, correlation, and storing. It allows using ASIST as common interface for remote monitor and control of heterogeneous equipments. It also provides failover capability to back up machines.

  3. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  4. Ground control station software design for micro aerial vehicles

    Science.gov (United States)

    Walendziuk, Wojciech; Oldziej, Daniel; Binczyk, Dawid Przemyslaw; Slowik, Maciej

    2017-08-01

    This article describes the process of designing the equipment part and the software of a ground control station used for configuring and operating micro unmanned aerial vehicles (UAV). All the works were conducted on a quadrocopter model being a commonly accessible commercial construction. This article contains a characteristics of the research object, the basics of operating the micro aerial vehicles (MAV) and presents components of the ground control station model. It also describes the communication standards for the purpose of building a model of the station. Further part of the work concerns the software of the product - the GIMSO application (Generally Interactive Station for Mobile Objects), which enables the user to manage the actions and communication and control processes from the UAV. The process of creating the software and the field tests of a station model are also presented in the article.

  5. VME-based remote instrument control without ground loops

    CERN Document Server

    Belleman, J; González, J L

    1997-01-01

    New electronics has been developed for the remote control of the pick-up electrodes at the CERN Proton Synchrotron (PS). Communication between VME-based control computers and remote equipment is via full duplex point-to-point digital data links. Data are sent and received in serial format over simple twisted pairs at a rate of 1 Mbit/s, for distances of up to 300 m. Coupling transformers are used to avoid ground loops. The link hardware consists of a general-purpose VME-module, the 'TRX' (transceiver), containing four FIFO-buffered communication channels, and a dedicated control card for each remote station. Remote transceiver electronics is simple enough not to require micro-controllers or processors. Currently, some sixty pick-up stations of various types, all over the PS Complex (accelerators and associated beam transfer lines) are equipped with the new system. Even though the TRX was designed primarily for communication with pick-up electronics, it could also be used for other purposes, for example to for...

  6. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  7. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  8. Development of Hybrid Product Breakdown Structure for NASA Ground Systems

    Science.gov (United States)

    Monaghan, Mark W.; Henry, Robert J.

    2013-01-01

    The Product Breakdown Structure is traditionally a method of identification of the products of a project in a tree structure. It is a tool used to assess, plan, document, and display the equipment requirements for a project. It is part of a product based planning technique, and attempts to break down all components of a project in as much detail as possible, so that nothing is overlooked. The PBS for ground systems at the Kennedy Space Center is being developed to encompass the traditional requirements including the alignment of facility, systems, and components to the organizational hierarchy. The Ground Operations Product Breakdown Structure is a hybrid in nature in that some aspects of a work breakdown structure will be incorporated and merged with the Architecture Concept of Operations, Master Subsystem List, customer interface, and assigned management responsibility. The Ground Operations Product Breakdown Structure needs to be able to identify the flexibility of support differing customers (internal and external) usage of ground support equipment within the Kennedy Space Center launch and processing complex. The development of the Product Breakdown Structure is an iterative activity Initially documenting the organization hierarchy structure and relationships. The Product Breakdown Structure identifies the linkage between the customer program requirements, allocation of system resources, development of design goals, and identification logistics products. As the Product Breakdown Structure progresses the incorporation of the results of requirement planning for the customer occurs identifying facility needs and systems. The mature Product Breakdown Structure is baselined with a hierarchical drawing, the Product Breakdown Structure database, and an associated document identifying the verification of the data through the life cycle of the program/product line. This paper will document, demonstrate, and identify key aspects of the life cycle of a Hybrid Product

  9. Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

    Science.gov (United States)

    Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.

    2013-01-01

    The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.

  10. Hydrogeology, simulated ground-water flow, and ground-water quality, Wright-Patterson Air Force Base, Ohio

    Science.gov (United States)

    Dumouchelle, D.H.; Schalk, C.W.; Rowe, G.L.; De Roche, J.T.

    1993-01-01

    Ground water is the primary source of water in the Wright-Patterson Air Force Base area. The aquifer consists of glacial sands and gravels that fill a buried bedrock-valley system. Consolidated rocks in the area consist of poorly permeable Ordovician shale of the Richmondian stage, in the upland areas, the Brassfield Limestone of Silurian age. The valleys are filled with glacial sediments of Wisconsinan age consisting of clay-rich tills and coarse-grained outwash deposits. Estimates of hydraulic conductivity of the shales based on results of displacement/recovery tests range from 0.0016 to 12 feet per day; estimates for the glacial sediments range from less than 1 foot per day to more than 1,000 feet per day. Ground water flow from the uplands towards the valleys and the major rivers in the region, the Great Miami and the Mad Rivers. Hydraulic-head data indicate that ground water flows between the bedrock and unconsolidated deposits. Data from a gain/loss study of the Mad River System and hydrographs from nearby wells reveal that the reach of the river next to Wright-Patterson Air Force Base is a ground-water discharge area. A steady-state, three-dimensional ground-water-flow model was developed to simulate ground-water flow in the region. The model contains three layers and encompasses about 100 square miles centered on Wright-Patterson Air Force Base. Ground water enters the modeled area primarily by river leakage and underflow at the model boundary. Ground water exits the modeled area primarily by flow through the valleys at the model boundaries and through production wells. A model sensitivity analysis involving systematic changes in values of hydrologic parameters in the model indicates that the model is most sensitive to decreases in riverbed conductance and vertical conductance between the upper two layers. The analysis also indicates that the contribution of water to the buried-valley aquifer from the bedrock that forms the valley walls is about 2 to 4

  11. TFTR grounding scheme and ground-monitor system

    International Nuclear Information System (INIS)

    Viola, M.

    1983-01-01

    The Tokamak Fusion Test Reactor (TFTR) grounding system utilizes a single-point ground. It is located directly under the machine, at the basement floor level, and is tied to the building perimeter ground. Wired to this single-point ground, via individual 500 MCM insulated cables, are: the vacuum vessel; four toroidal field coil cases/inner support structure quadrants; umbrella structure halves; the substructure ring girder; radial beams and columns; and the diagnostic systems. Prior to the first machine operation, a ground-loop removal program was initiated. It required insulation of all hangers and supports (within a 35-foot radius of the center of the machine) of the various piping, conduits, cable trays, and ventilation systems. A special ground-monitor system was designed and installed. It actively monitors each of the individual machine grounds to insure that there are no inadvertent ground loops within the machine structure or its ground and that the machine grounds are intact prior to each pulse. The TFTR grounding system has proven to be a very manageable system and one that is easy to maintain

  12. Determining Component Probability using Problem Report Data for Ground Systems used in Manned Space Flight

    Science.gov (United States)

    Monaghan, Mark W.; Gillespie, Amanda M.

    2013-01-01

    During the shuttle era NASA utilized a failure reporting system called the Problem Reporting and Corrective Action (PRACA) it purpose was to identify and track system non-conformance. The PRACA system over the years evolved from a relatively nominal way to identify system problems to a very complex tracking and report generating data base. The PRACA system became the primary method to categorize any and all anomalies from corrosion to catastrophic failure. The systems documented in the PRACA system range from flight hardware to ground or facility support equipment. While the PRACA system is complex, it does possess all the failure modes, times of occurrence, length of system delay, parts repaired or replaced, and corrective action performed. The difficulty is mining the data then to utilize that data in order to estimate component, Line Replaceable Unit (LRU), and system reliability analysis metrics. In this paper, we identify a methodology to categorize qualitative data from the ground system PRACA data base for common ground or facility support equipment. Then utilizing a heuristic developed for review of the PRACA data determine what reports identify a credible failure. These data are the used to determine inter-arrival times to perform an estimation of a metric for repairable component-or LRU reliability. This analysis is used to determine failure modes of the equipment, determine the probability of the component failure mode, and support various quantitative differing techniques for performing repairable system analysis. The result is that an effective and concise estimate of components used in manned space flight operations. The advantage is the components or LRU's are evaluated in the same environment and condition that occurs during the launch process.

  13. Effectiveness of mat Pilates or equipment-based Pilates in patients with chronic non-specific low back pain: a protocol of a randomised controlled trial

    Science.gov (United States)

    2013-01-01

    Background Chronic low back pain is an expensive and difficult condition to treat. One of the interventions widely used by physiotherapists in the treatment of chronic non-specific low back pain is exercise therapy based upon the Pilates principles. Pilates exercises can be performed with or without specific equipment. These two types of Pilates exercises have never been compared on a high-quality randomised controlled trial. Methods/design This randomised controlled trial with a blinded assessor will evaluate eighty six patients of both genders with chronic low back pain, aged between 18 and 60 years, from one Brazilian private physiotherapy clinic. The patients will be randomly allocated into two groups: Mat Group will perform the exercises on the ground while the Equipment-based Group will perform the Pilates method exercises on the following equipment: Cadillac, Reformer, Ladder Barrel, and Step Chair. The general and specific disability of the patient, kinesiophobia, pain intensity and global perceived effect will be evaluated by a blinded assessor before randomisation and at six weeks and six months after randomisation. In addition, the expectation of the participants and their confidence with the treatment will be evaluated before randomisation and after the first treatment session, respectively. Discussion This will be the first study aiming to compare the effectiveness of Mat and Equipment-based Pilates exercises in patients with chronic non-specific low back pain. The results may help health-care professionals in clinical decision-making and could potentially reduce the treatment costs of this condition. Trial registration Brazilian Registry of Clinical Trials RBR-7tyg5j PMID:23298183

  14. The critical role of community-based micro-grants for disability aids and equipment: results from a needs analysis.

    Science.gov (United States)

    Muenchberger, Heidi; Ehrlich, Carolyn; Parekh, Sanjoti; Crozier, Michelle

    2016-01-01

    To investigate the role of philanthropic micro-grants (maximum of $10,000) in the provision of aids and equipment for adults (aged 18-65 years of age) with complex disabilities and examine key trends in aids and equipment requests. This study examined, through quantitative and qualitative analysis, aids and equipment requests (n = 371 individual applications as represented by 136 service organisations in three Australian states) received by a not-for-profit (NFP) organisation across five consecutive years of an innovative micro-grants scheme. Findings highlight that living situation (living with family or living independently) significantly influences the nature of requests for respite, aids, equipment and home modifications. Specifically, people with complex disabilities living with their families require greater combined service provision (higher equipment need, respite support, home modifications) than those living independently (equipment need only). Type of disability did not influence request type. Qualitative data further indicated the "last resort" nature of respite requests, particularly for younger applicants (under 45 years of age) indicating critical unmet needs in the community. Results demonstrate the vital role of NFP organisations and philanthropic funds in supporting daily lifestyle aids and equipment (including respite) that might otherwise not be funded for people with complex disabilities. Although preliminary in its scope and prior to implementation of a National Disability Insurance Scheme (NDIS) in Australia, findings suggest both opportunity and risk to the uptake of community-based micro-grant funding: opportunity for users through the provision of essential aids and lifestyle supports, and risk through over-subscription and devolving of responsibility for critical support resources from public sector. The aids and equipment needs of adults under the age of 65 appear to have been underestimated, poorly defined and under

  15. Age dating ground water by use of chlorofluorocarbons (CCl3F and CCl2F2), and distribution of chlorofluorocarbons in the unsaturated zone, Snake River Plain aquifer, Idaho National Engineering Laboratory, Idaho

    International Nuclear Information System (INIS)

    Busenberg, E.; Weeks, E.P.; Plummer, L.N.; Bartholomay, R.C.

    1993-04-01

    Detectable concentrations of chlorofluorocarbons (CFC's) were observed in ground water and unsaturated-zone air at the Idaho National Engineering Laboratory (INEL) and vicinity. The recharge ages of waters were determined to be from 4 to more than 50 years on the basis of CFC concentrations and other environmental data; most ground waters have ages of 14 to 30 years. These results indicate that young ground water was added at various locations to the older regional ground water (greater than 50 years) within and outside the INEL boundaries. The wells drilled into the Snake River Plain aquifer at INEL sampled mainly this local recharge. The Big Lost River, Birch Creek, the Little Lost River, and the Mud Lake-Terreton area appear to be major sources of recharge of the Snake River Plain aquifer at INEL. An average recharge temperature of 9.7±1.3 degrees C (degrees Celsius) was calculated from dissolved nitrogen and argon concentrations in the ground waters, a temperature that is similar to the mean annual soil temperature of 9 degrees C measured at INEL. This similarity indicates that the aquifer was recharged at INEL and not at higher elevations that would have cooler soil temperatures than INEL. Soil-gas concentrations at Test Area North (TAN) are explained by diffusion theory

  16. Overview of statistical methods, models and analysis for predicting equipment end of life

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    Utility equipment can be operated and maintained for many years following installation. However, as the equipment ages, utility operators must decide whether to extend the service life or replace the equipment. Condition assessment modelling is used by many utilities to determine the condition of equipment and to prioritize the maintenance or repair. Several factors are weighted and combined in assessment modelling, which gives a single index number to rate the equipment. There is speculation that this index alone may not be adequate for a business case to rework or replace an asset because it only ranks an asset into a particular category. For that reason, a new methodology was developed to determine the economic end of life of an asset. This paper described the different statistical methods available and their use in determining the remaining service life of electrical equipment. A newly developed Excel-based demonstration computer tool is also an integral part of the deliverables of this project.

  17. Evaluation of Ground Water Near Sidney, Western Nebraska, 2004-05

    Science.gov (United States)

    Steele, G.V.; Sibray, S.S.; Quandt, K.A.

    2007-01-01

    During times of drought, ground water in the Lodgepole Creek area around Sidney, western Nebraska, may be insufficient to yield adequate supplies to private and municipal wells. Alternate sources of water exist in the Cheyenne Tablelands north of the city, but these sources are limited in extent. In 2003, the U.S. Geological Survey and the South Platte Natural Resources District began a cooperative study to evaluate the ground water near Sidney. The 122-square-mile study area lies in the south-central part of Cheyenne County, with Lodgepole Creek and Sidney Draw occupying the southern and western parts of the study area and the Cheyenne Tablelands occupying most of the northern part of the study area. Twenty-nine monitoring wells were installed and then sampled in 2004 and 2005 for physical characteristics, nutrients, major ions, and stable isotopes. Some of the 29 sites also were sampled for ground-water age dating. Ground water is limited in extent in the tableland areas. Spring 2005 depths to ground water in the tableland areas ranged from 95 to 188 feet. Ground-water flow in the tableland areas primarily is northeasterly. South of a ground-water divide, ground-water flows southeasterly toward Lodgepole Creek Valley. Water samples from monitoring wells in the Ogallala Group were predominantly a calcium bicarbonate type, and those from monitoring wells in the Brule Formation were a sodium bicarbonate type. Water samples from monitoring wells open to the Brule sand were primarily a calcium bicarbonate type at shallow depths and a sodium bicarbonate type at deeper depths. Ground water in Lodgepole Creek Valley had a strong sodium signature, which likely results from most of the wells being open to the Brule. Concentrations of sodium and nitrate in ground-water samples from the Ogallala were significantly different than in water samples from the Brule and Brule sand. In addition, significant differences were seen in concentrations of calcium between water samples

  18. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  19. IEEE standard for design qualification of safety systems equipment used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This standard is written to serve as a general standard for qualification of all types of safety systems equipment, mechanical and instrumentation as well as electrical. It also establishes principles and procedures to be followed in preparing specific safety systems equipment standards. Guidance for qualifying specific safety systems equipment may be found in various specific equipment qualification standards that are now available or are being prepared. It is required that safety systems equipment in nuclear power generating stations meet or exceed its performance requirements throughout its installed life. This is accomplished by a disciplined program of design qualification and quality assurance of design, production, installation, maintenance and surveillance. This standard is for the design qualification section of the program only. Design qualification is intended to demonstrate the capability of the equipment design to perform its safety function(s) over the expected range of normal, abnormal, design basis event, post design basis event, and in-service test conditions. Inherent to design qualification is the requirement for demonstration, within limitations afforded by established technical state-of-the-art, that in-service aging throughout the qualified life established for the equipment will not degrade safety systems equipment from its original design condition to the point where it cannot perform its required safety function(s), upon demand. The above requirement reflects the primary role of design qualification to provide reasonable assurance that design- and age-related common failure modes will not occur during performance of safety function(s) under postulated service conditions

  20. Failure analysis and success analysis: roles in plant aging assessments

    International Nuclear Information System (INIS)

    Johnson, A.B. Jr.

    1985-06-01

    Component aging investigations are an important element in NRC's Nuclear Plant Aging Research (NPAR) strategy. Potential sources of components include plants in decommissioning and commercial plant, both for in situ tests and for examination of equipment removed from service. Nuclear utilities currently have voluntary programs addressing aspects of equipment reliability, such as root cause analysis for safety-related equipment that malfunctions, and trending analysis to follow the course of both successful and abnormal equipment performance. Properly coordinated, the NPAR and utility programs offer an important approach to establish the data base necessary for life extension of nuclear electrical generating plants

  1. TDRSS multimode transponder program. Phase 2: Equipment development

    Science.gov (United States)

    Cnossen, R. S.

    1974-01-01

    This report contains a complete description of the TDRS Multimode Transponder and its associated ground support equipment. The transponder will demonstrate candidate modulation techniques to provide the required information for the design of an eventual VHF/UHF transponder suitable for installation in a user satellite, capable of operating as part of a Tracking and Data Relay Satellite (TDRS) systems. Use of geosynchronous TDRS which can serve both low data rate users at VHF and high data rate users at other frequencies has been considered. The effects of radio frequency interference from the earth and of multipath propagation due to reflections from the earth are expected to pose problems for the TDRS system at VHF. Investigations have suggested several modulation techniques that offer promise to overcome these problems.

  2. Stand, Harvest, and Equipment Interactions in Simulated Harvesting Prescriptions

    Science.gov (United States)

    Jingxin Wang; W. Dale Greene; Bryce J. Stokes

    1998-01-01

    We evaluated potential interactions of stand type, harvesting method, and equipment in an experiment using interactive simulation. We examined three felling methods (chain saw, feller-buncher, harvester) and two extraction methods (grapple skidder and forwarder) performing clearcuts, sheltenvood cuts, and single-tree selection cuts in both an uneven-aged natural stand...

  3. Ground Penetrating Radar Investigations in the Noble Hall of São Carlos Theater in Lisbon, Portugal

    Science.gov (United States)

    Fontul, S.; Solla, M.; Cruz, H.; Machado, J. S.; Pajewski, L.

    2018-05-01

    This paper describes a study conducted by the National Laboratory for Civil Engineering of Portugal (LNEC), in cooperation with the Defense University Center at the Spanish Naval Academy and "La Sapienza," University of Rome, to assess the health and safety conditions of the Noble Hall floor in the São Carlos National Theater (Lisbon, Portugal). In a multidisciplinary approach, extensive fieldwork was carried out. The survey included the location and characterization of beams in the various areas of the floor by using two ground penetrating radar (GPR) systems equipped with two different ground- or air-coupled antennas, local inspection openings to visually assess the geometry, timber species and conservation state of structural members, and an assessment of the conservation state of the timber beam ends using drilling equipment. All the tests performed and the results obtained are presented. The potential of using non-destructive tests for the inspection of timber cultural heritage structures, particularly GPR, is discussed, and some practical recommendations are made.

  4. Life Cycle Management for Equipments in Nuclear Plants Based on Reliability

    International Nuclear Information System (INIS)

    Wang Dalin; Sun Jinlong

    2012-01-01

    Majority of equipments in nuclear power stations are not un-repairable, but repaired after failures or maintained periodically and then returned to running. Along with aging or fatigue causes, duration between failures may be variable such as larger or shorter. Equipments failure occurrences are consistent with non-homogeneous Poisson process (NHPP), in which their failure rates are variable. We chose Weibull process to simplify the actual circumstances to obtain the optimal life cycle management plans approximately. In application we need to estimate parameters of Weibull process with existing data. Before that, trend test is necessary. Total time test (TTT) is an alternative. Trend test can determine whether the failure rate changes along operating time and whether the devices operated under imperfect or minimal repair. Parameters of Weibull process λ, β can be estimated by maximum likelihood estimation method. LCM model is designed to found an optimizing model for those aging equipments under minimal repair or imperfect maintenance with maximum economic or availability as objective function. The purpose is to establish the optimal replacement strategies. Periodical replacement is the most regular choice and so LCM model aims to calculate the optimal replacement periodical duration.

  5. Hanford ground-water data base management guide and user's manual

    International Nuclear Information System (INIS)

    Mitchell, P.J.; Argo, R.S.; Bradymire, S.L.; Newbill, C.A.

    1985-05-01

    This management guide and user's manual is a working document for the computerized Hanford Ground-water Data Base maintained by the Geosciences Research and Engineering Department at Pacific Northwest Laboratory for the Hanford Ground-Water Surveillance Program. The program is managed by the Occupational and Environmental Protection Department for the US Department of Energy. The data base is maintained to provide rapid access to data that are rountinely collected from ground-water monitoring wells at the Hanford site. The data include water levels, sample analyses, geologic descriptions and well construction information of over 3000 existing or destroyed wells. These data are used to monitor water quality and for the evaluation of ground-water flow and pollutant transport problems. The management guide gives instructions for maintenance of the data base on the Digital Equipment Corporation PDP 11/70 Computer using the CIRMIS (Comprehensive Information Retrieval and Model Input Sequence) data base management software developed at Pacific Northwest Laboratory. Maintenance activities include inserting, modifying and deleting data, making back-up copies of the data base, and generating tables for annual monitoring reports. The user's guide includes instructions for running programs to retrieve the data in the form of listings of graphical plots. 3 refs

  6. Development of a PC-based ground support system for a small satellite instrument

    Science.gov (United States)

    Deschambault, Robert L.; Gregory, Philip R.; Spenler, Stephen; Whalen, Brian A.

    1993-11-01

    The importance of effective ground support for the remote control and data retrieval of a satellite instrument cannot be understated. Problems with ground support may include the need to base personnel at a ground tracking station for extended periods, and the delay between the instrument observation and the processing of the data by the science team. Flexible solutions to such problems in the case of small satellite systems are provided by using low-cost, powerful personal computers and off-the-shelf software for data acquisition and processing, and by using Internet as a communication pathway to enable scientists to view and manipulate satellite data in real time at any ground location. The personal computer based ground support system is illustrated for the case of the cold plasma analyzer flown on the Freja satellite. Commercial software was used as building blocks for writing the ground support equipment software. Several levels of hardware support, including unit tests and development, functional tests, and integration were provided by portable and desktop personal computers. Satellite stations in Saskatchewan and Sweden were linked to the science team via phone lines and Internet, which provided remote control through a central point. These successful strategies will be used on future small satellite space programs.

  7. Frail aged persons residing in South African' homes for the aged ...

    African Journals Online (AJOL)

    economic incomes (i.e. less than R450 per month) living in homes for the aged in rural areas who require more staff time and/or expertise and/or medical equipment than can be sup- plied in a home and who, consequently, would benefit by admission to a hospital, 29 rural homes for the aged in the. Orange Free State were ...

  8. Effective recordkeeping technologies to manage aging

    International Nuclear Information System (INIS)

    Dukelow, J.S.; Johnson, A.B. Jr.; Vora, J.P.

    1992-10-01

    Pacific Northwest Laboratory has investigated the capability of current recordkeeping technology to support aging management. This paper discusses technical issues associated with potential enhancements of nuclear plant records systems--from the perspective of the lessons learned about equipment aging degradation mechanisms and associated surveillance and monitoring techniques during the U. S. Nuclear Regulatory Commission's Nuclear Plant Aging Research Program. The paper considers both the specific types of technical data needed to ensure continued safe operation and the use of new technology to upgrade record systems. Specific topics discussed include: equipment reliability data needed to support the assessment of the impact of aging on the continued operation of the plant; operational history data to support the assessment of residual life of mechanical and structural components and piping; tools for the analysis and trending of equipment reliability data and operational history data; design and implementation of plant record systems that will provide a comprehensive and usable engineering design basis for the plant; proposed improvements in the data input process for the plant records system; computerization of plant records systems, including conversion of existing records into machine-readable forms

  9. Effective recordkeeping technologies to manage aging

    Energy Technology Data Exchange (ETDEWEB)

    Dukelow, J.S.; Johnson, A.B. Jr. (Pacific Northwest Lab., Richland, WA (United States)); Vora, J.P. (Nuclear Regulatory Commission, Washington, DC (United States))

    1992-10-01

    Pacific Northwest Laboratory has investigated the capability of current recordkeeping technology to support aging management. This paper discusses technical issues associated with potential enhancements of nuclear plant records systems--from the perspective of the lessons learned about equipment aging degradation mechanisms and associated surveillance and monitoring techniques during the U. S. Nuclear Regulatory Commission's Nuclear Plant Aging Research Program. The paper considers both the specific types of technical data needed to ensure continued safe operation and the use of new technology to upgrade record systems. Specific topics discussed include: equipment reliability data needed to support the assessment of the impact of aging on the continued operation of the plant; operational history data to support the assessment of residual life of mechanical and structural components and piping; tools for the analysis and trending of equipment reliability data and operational history data; design and implementation of plant record systems that will provide a comprehensive and usable engineering design basis for the plant; proposed improvements in the data input process for the plant records system; computerization of plant records systems, including conversion of existing records into machine-readable forms.

  10. Effective recordkeeping technologies to manage aging

    Energy Technology Data Exchange (ETDEWEB)

    Dukelow, J.S.; Johnson, A.B. Jr. [Pacific Northwest Lab., Richland, WA (United States); Vora, J.P. [Nuclear Regulatory Commission, Washington, DC (United States)

    1992-10-01

    Pacific Northwest Laboratory has investigated the capability of current recordkeeping technology to support aging management. This paper discusses technical issues associated with potential enhancements of nuclear plant records systems--from the perspective of the lessons learned about equipment aging degradation mechanisms and associated surveillance and monitoring techniques during the U. S. Nuclear Regulatory Commission`s Nuclear Plant Aging Research Program. The paper considers both the specific types of technical data needed to ensure continued safe operation and the use of new technology to upgrade record systems. Specific topics discussed include: equipment reliability data needed to support the assessment of the impact of aging on the continued operation of the plant; operational history data to support the assessment of residual life of mechanical and structural components and piping; tools for the analysis and trending of equipment reliability data and operational history data; design and implementation of plant record systems that will provide a comprehensive and usable engineering design basis for the plant; proposed improvements in the data input process for the plant records system; computerization of plant records systems, including conversion of existing records into machine-readable forms.

  11. Analytical Investigation Of Pigments, Ground Layer And Media Of Cartonnage Fragments From Greek Roman Period

    Science.gov (United States)

    Afifi, Hala. A. M.

    Some cartonnage fragments from Hawara, Fayoum Excavation were examined to identify pigments, media and grounds. It belonged to the Greek-Roman period. They were studied by X-ray diffraction (XRD), Energy dispersive X ray analysis (EDS) equipped with Scanning electron microscopy (SEM) and Fourier transform infrared spectroscopy (FTIR). These techniques were used to identify the composition and morphology of grounds, nature of pigments and media used in cartonnage fragments. The coarse ground layer was composed of calcite and traces of quartz. The fine ground layer used under the pigments directly was composed of calcite only. Carbon black was used as black pigment while lead oxide as red pigment, showing the influence of Roman and Greek pigments on Egyptian art in these later periods. Blue colorant was identified as cuprorivaite and yellow pigment was goethite. Animal glue was used in the four pigments as medium colored.

  12. Methodological framework for the ergonomic design of children's playground equipment: a Serbian experience.

    Science.gov (United States)

    Grozdanovic, Miroljub; Jekic, Savko; Stojiljkovic, Evica

    2014-01-01

    Adequate application of the static and dynamic anthropometric measures of pre-school children in ergonometric design of children's playground equipment should eliminate all dangers and difficulties in their use. Possibilities of injuries, insecure movements, discomfort able positions and some other dangerous actions may be minimized; and safety and health protection of pre-school children will be increased. Children's playground represents a significant space of activity for pre-school children. Therefore, it is necessary to apply ergonomic principles which contribute to the adjustment of the playground elements to children's anatomic features. Based on the results presented in this paper, new constructions were designed and new playgrounds were installed in Serbia. Participants were children from three pre-school age groups: Junior age group (3-4 years of age, 17 children), Medium age group (4-5 years of age, 22 children), and Senior age group (5-6 years of age, 26 children). Thirty-one static anthropometric measures (12 in standing position, 11 in sitting position, 7 related to dimensions of hand, foot an head, with body weight and shoe size) and 15 dynamic anthropometric measures (7 in standing position, 6 in sitting position and 2 dimension of foot and hand) were defined for the study. Measurements were taken using an anthrop-meter, a flexible measuring tape. Equations for ergonomic design of children's playground elements were also defined. Basic statistical data of static and dynamic anthropometric measurements of the pre-school children are presented in this paper, as well as the statistical calculation of the corrective anthropometric measurements. Measurements were performed in "Poletarac" kindergarten, part of the pre-school institution "Radost" in Cacak. Elements of playground equipment in "Bambi" kindergarten in Kragujevac (the Indian tent "wigwam", gate-house, swing and carousel) were designed and built using these parameters. Based on the obtained

  13. EPRI research on component aging and nuclear plant life extension

    International Nuclear Information System (INIS)

    Sliter, G.E.; Carey, J.J.

    1985-01-01

    This paper first describes several research efforts sponsored by the Electric Power Research Institute (EPRI) that examine the aging degradation of organic materials and the nuclear plant equipment in which they appear. This research includes a compendium of material properties characterizing the effects of thermal and radiation aging, shake table testing to evaluate the effects of aging on the seismic performance of electrical components, and a review of condition monitoring techniques applicable to electrical equipment. Also described is a long-term investigation of natural versus artificial aging using reactor buildings as test beds. The paper then describes how the equipment aging research fits into a broad-scoped EPRI program on nuclear plant life extension. The objective of this program is to provide required information, technology, and guidelines to enable utilities to significantly extend operating life beyond the current 40-year licensed term

  14. Beyond the glitz of new equipment

    International Nuclear Information System (INIS)

    Stolberg, H.O.; Nahmias, C.

    2001-01-01

    Canadian radiologists were informed by the press on Mar. 17, 2001, about an important initiative of their national organization. The CAR had commissioned a Montreal law firm to provide a legal opinion about the use of 'obsolete equipment'. The lawyer of the law firm opined that 'it is imperative that the patient be advised and understand the risks and uncertainties associated with the reliability of such an examination'. The 5-page legal opinion (available at www.car.ca) also recommended that radiologists inform patients that they should consider shopping around for a hospital or clinic with newer machines, even if it means travelling out of the country. When summarizing the legal advice for the media, the Chief Executive Officer of the CAR said radiologists should advise patients if better equipment is available in other facilities, including 'private facilities', or in other jurisdictions, such as the United States. These developments should be of great concern to Canadian radiologists who are well aware of the problems associated with aging equipment and the lack of and limited access to newer imaging modalities. The legal initiative of the CAR, however, makes it imperative for individual radiologists to provide comments and for the CAR executive to answer a number of questions and address a number of priorities, including the following. (author)

  15. An emerging etiological factor for hand injuries in the pediatric population: public exercise equipment.

    Science.gov (United States)

    Akşam, Berrak; Akşam, Ersin; Ceran, Candemir; Demirseren, Mustafa Erol

    2016-01-01

    The purpose of this study was to describe the role of public exercise equipment in pediatric hand traumas as a preventable etiological factor. Pediatric patients with hand injuries referred from the emergency department were evaluated retrospectively. Age and gender of the patients, timing, etiology, mechanism of hand trauma, localization of the injury, diagnoses of the patients, and hospitalization rates were reviewed. Amongst the 310 pediatric patients evaluated, 31 patients (10%) experienced injury related to public exercise equipment. Within this group of patients, most were between 5 to 9 years of age, and all injuries were blunt and crush type. Lacerations and fractures were the main diagnoses. Complex injuries that required inpatient care were reported in 19.3% of the patients. Public exercise equipment-related injuries are increasingly prevalent in pediatric hand traumas. Preventive actions such as shielding the moving parts should be taken to reduce these rates.

  16. Meeting needs for rehabilitation equipment and home adjustments among the disabled in their life environment

    Directory of Open Access Journals (Sweden)

    Barbara Kołłątaj

    2015-09-01

    Both the provision of orthopaedic equipment and adjustment of the home to disability are insufficient with respect to the needs. The meeting of these needs is significantly conditioned by high or very high material standard. The lack or incomplete satisfaction with the needs for rehabilitation equipment is associated with a relatively younger age, independent, single residence and low material standard. Living in an residential home means better adjustment of the living environment, and better provision with orthopaedic and rehabilitation equipment.

  17. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  18. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  19. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  20. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  1. Extending PSA models including ageing and asset management - 15291

    International Nuclear Information System (INIS)

    Martorell, S.; Marton, I.; Carlos, S.; Sanchez, A.I.

    2015-01-01

    This paper proposes a new approach to Ageing Probabilistic Safety Assessment (APSA) modelling, which is intended to be used to support risk-informed decisions on the effectiveness of maintenance management programs and technical specification requirements of critical equipment of Nuclear Power Plants (NPP) within the framework of the Risk Informed Decision Making according to R.G. 1.174 principles. This approach focuses on the incorporation of not only equipment ageing but also effectiveness of maintenance and efficiency of surveillance testing explicitly into APSA models and data. This methodology is applied to a motor-operated valve of the auxiliary feed water system (AFWS) of a PWR. This simple example of application focuses on a critical safety-related equipment of a NPP in order to evaluate the risk impact of considering different approaches to APSA and the combined effect of equipment ageing and maintenance and testing alternatives along NPP design life. The risk impact of several alternatives in maintenance strategy is discussed

  2. NuPEER Dijon 2005 Symposium. Ageing issues in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Emond, David (ed.) [BCCN, Autorite de Surete Nucleaire, ASN, 6, place du Colonel Bourgoin, 75572 Paris Cedex 12 (France)

    2005-07-01

    The French Nuclear Safety Authority (ASN) organized an international symposium on regulatory aspects of ageing issues for nuclear pressure equipment. The ageing of nuclear pressure equipment is an issue of growing importance for nuclear regulators and material experts worldwide as age-related degradation of major pressure-retaining components challenges the remaining operating life of nuclear power plants. This symposium aimed at providing a forum for technical exchange among the staffs responsible for nuclear pressure equipment within the safety authorities and the associated expertise organisations. The contents of the symposium is as follows: 1. Control and supervision of safety of nuclear pressure equipment in France and abroad; 1.1. Position of the French Nuclear Safety Authority (1 paper); 1.2. Regulatory practices worldwide (4 papers); 1.3. Licence renewal: Field experience (2 papers); 1.4. Role of international organisations (1 paper); 2. Management of equipment and materials: From design to degradation mechanisms; 2.1. Operation and equipment (4 papers); 2. Evolution of materials (4 papers); 2.3. Fatigue degradation mechanisms (3 papers); 2.4. Contribution of research and development (4 papers); 3. In-service inspection: Evolutions, methods and strategies; 3.1. Methods and evolution (1 paper); 3.2. Qualification of methods (2 papers); 3.3. Surveillance strategies (2 papers); 4. Testimonies and points of view of utilities (3 papers); 5. Ageing issues taken into account in non nuclear fields (2 papers). The symposium began with workshops devoted to: Operation and equipment; Behaviour of materials; Fatigue degradations; Contributions of research and development. The symposium continued with plenary session that addressed the following issues: Control and supervision of safety of nuclear pressure equipment; Role of international organisations; In-service inspection: Objectives, methods and strategies; Point of view of utilities; Technical summary and

  3. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Upgrade Travel Funding' - This subtask provides funding for the upgrade of DIS equipment installed in the field; E.125.3, 'DIS Radiation Field Characterization' - This subtask provides for the procurement by the IAEA of radiation measurement equipment and technical assistance for the characterization of radiation conditions in the locations where DIS will be installed. This will help the IAEA ensure that the design specifications for the equipment are consistent with the location where the instrument will be used; E.125.4, 'DIS Design Limit Testing and Advise to Strengthen IAEA's Current Equipment Qualification Criteria' - Under this subtask, Wyle Laboratories and Quanterion Solutions will conduct SDIS design limit testing, including harsh environmental testing and accelerated aging, to determine the expected lifetime and produce a design limit report to include maximum operating environment vs. design limit analysis. Additionally, this task will include the development of a strengthened environmental qualification test plan and reliability and maintainability definition methodology for all safeguards equipment. The implementation of new equipment by the Department of Safeguards is costly. Expected costs associated with the implementation of equipment include capital costs, training and in some cases travel. The cost is dramatically increased when operational issues arise due to the costs of studying the issues, modifying and upgrading the equipment and additional travel. The U.S. Support Program believes that the IAEA's Division of Safeguards Technical Support (SGTS) must strengthen its equipment-testing program to ensure that the equipment it approves for inspection use is reliable and will not place additional burden on the Department of Safeguards' maintenance and inspection staff. The U.S. Support Program recognizes that SGTS already requires a series of fundamentally important and revealing tests, but we believe that additional tests should be added to the testing

  4. Modeling of Rocket Fuel Heating and Cooling Processes in the Interior Receptacle Space of Ground-Based Systems

    Directory of Open Access Journals (Sweden)

    K. I. Denisova

    2016-01-01

    Full Text Available The propellant to fill the fuel tanks of the spacecraft, upper stages, and space rockets on technical and ground-based launch sites before fueling should be prepared to ensure many of its parameters, including temperature, in appropriate condition. Preparation of fuel temperature is arranged through heating and cooling the rocket propellants (RP in the tanks of fueling equipment. Processes of RP temperature preparation are the most energy-intensive and timeconsuming ones, which require that a choice of sustainable technologies and modes of cooling (heating RP provided by the ground-based equipment has been made through modeling of the RP [1] temperature preparation processes at the stage of design and operation of the groundbased fueling equipment.The RP temperature preparation in the tanks of the ground-based systems can be provided through the heat-exchangers built-in the internal space and being external with respect to the tank in which antifreeze, air or liquid nitrogen may be used as the heat transfer media. The papers [1-12], which note a promising use of the liquid nitrogen to cool PR, present schematic diagrams and modeling systems for the RP temperature preparation in the fueling equipment of the ground-based systems.We consider the RP temperature preparation using heat exchangers to be placed directly in RP tanks. Feeding the liquid nitrogen into heat exchanger with the antifreeze provides the cooling mode of PR while a heated air fed there does that of heating. The paper gives the systems of equations and results of modeling the processes of RP temperature preparation, and its estimated efficiency.The systems of equations of cooling and heating RP are derived on the assumption that the heat exchange between the fuel and the antifreeze, as well as between the storage tank and the environment is quasi-stationary.The paper presents calculation results of the fuel temperature in the tank, and coolant temperature in the heat exchanger, as

  5. 30 CFR 75.703-3 - Approved methods of grounding offtrack mobile, portable and stationary direct-current machines.

    Science.gov (United States)

    2010-07-01

    ..., portable and stationary direct-current machines. 75.703-3 Section 75.703-3 Mineral Resources MINE SAFETY... stationary direct-current machines. In grounding offtrack direct-current machines and the enclosures of their... requirements: (1) Installation of silicon diodes shall be restricted to electric equipment receiving power from...

  6. Detecting and mitigating inverter aging

    International Nuclear Information System (INIS)

    Gunther, W.E.; Taylor, J.H.; Aggarwal, S.K.

    1988-01-01

    Nuclear power plants use inverters to supply power to safety-related equipment, instrumentation, and controls. They convert direct current (dc) to alternating current (ac) power, thereby making low voltage ac power available even under a station blackout condition. As part of the U.S. NRC's nuclear plant aging research (NPAR) program, the operating experience of this equipment has been analyzed to determine the dominant failure modes and causes. This paper summarizes that data, and then describes methods which can be employed to detect inverter degradation prior to failure, as well as methods to minimize the failure effects. In both cases, the mitigation of inverter aging is emphasized

  7. Safety of information in electronic equipment influenced by the charged space particles

    Directory of Open Access Journals (Sweden)

    Ksenia Gennad’evna Sizova

    2016-10-01

    Full Text Available A version of the existing evaluation method of electronic equipment to the influence of charged space particles causing single event effects for the purpose of improving the accuracy of calculation in the field of information safety is suggested. On the basis of the existing and modified methods radiation tolerance of real payload spacecraft responsible for the security of transmitted information are defined. The results of comparison are introduced. Significant differences not only in quantitative but also in qualitative character of tolerance indicators are revealed. It is demonstrated that the modified method allows to take into account the functional complexity of the hardware and the application efficiency of the sophisticated single event effects protection tools. To confirm the applicability of the modified method of equipment tolerance evaluation method to the influence of charged space particles causing single event effects proposals to the procedure of ground tests of the payload and the space experiment are developed.

  8. Protection of control and monitoring equipment from electromagnetic noise in the 67 MJ, 50 kV capacitor bank

    Energy Technology Data Exchange (ETDEWEB)

    Galakhov, I V; Gasheev, A S; Grusin, I A; Gudov, S N; Kuz` michev, Yu P; Murugov, V M; Osin, V A; Pankratov, V I; Pegoev, I N [All-Russian Scientific Research Inst. of Experimental Physics, Sarov (Russian Federation)

    1997-12-31

    A discharge of the 67 MJ and 50 kV capacitor bank used as a pulsed power system for flashlamp pumping of ISKRA-5`s high-power iodine laser, involves control and diagnostic equipment being subjected to significant electromagnetic fields and electrical interference that will further develop through conductive circuits. The paper describes and validates design approaches to the grounding system, signal carriage and decoupling circuits that would result in lower interference both for the capacitor bank`s control and diagnostics systems. A summary is also given of the ten-years` practice in operating the control and diagnostics equipment during the facility experiments. (author). 1 tab., 3 refs.

  9. Report on the FY 1999 R and D on medical welfare equipment technology. Comprehensive survey of welfare equipment; 1999 nendo iryo fukushi kiki gijutsu kenkyu kaihatsu hokokusho. Fukushi kiki sozo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The paper made it clear what kinds of R and D will be required for equipment which supports action of aged handicapped persons in daily life and social life in the following three fields: support of walking and movement in daily life, grasp of action and life situation, and support of operation of life information. The purpose of the survey is to intensify the results as the data for effective promotion of the commercialization of the welfare equipment/system which are great in safety and convenience, low-priced, and high-efficient making use of high-tech industrial technology in the project for the R and D of medical welfare equipment technology promoted by NEDO. Therefore, the item for survey in the important field was made 'the comprehensive survey on the project of the R and D on welfare technology such as life supporting robot systems.' The survey was made on the following: (1) 'life support robot' which supports walking and simple motion in daily life of aged people, (2) 'life support information terminal' which enables regional communication and is easy for aged people to use, (3) 'monitoring system for at-home daily activities and life situation' using sensor integrated into electric home appliances, etc. (NEDO)

  10. Report on the FY 1999 R and D on medical welfare equipment technology. Comprehensive survey of welfare equipment; 1999 nendo iryo fukushi kiki gijutsu kenkyu kaihatsu hokokusho. Fukushi kiki sozo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The paper made it clear what kinds of R and D will be required for equipment which supports action of aged handicapped persons in daily life and social life in the following three fields: support of walking and movement in daily life, grasp of action and life situation, and support of operation of life information. The purpose of the survey is to intensify the results as the data for effective promotion of the commercialization of the welfare equipment/system which are great in safety and convenience, low-priced, and high-efficient making use of high-tech industrial technology in the project for the R and D of medical welfare equipment technology promoted by NEDO. Therefore, the item for survey in the important field was made 'the comprehensive survey on the project of the R and D on welfare technology such as life supporting robot systems.' The survey was made on the following: (1) 'life support robot' which supports walking and simple motion in daily life of aged people, (2) 'life support information terminal' which enables regional communication and is easy for aged people to use, (3) 'monitoring system for at-home daily activities and life situation' using sensor integrated into electric home appliances, etc. (NEDO)

  11. An imminent human resource crisis in ground water hydrology?

    Science.gov (United States)

    Stephens, Daniel B

    2009-01-01

    Anecdotal evidence, mostly from the United States, suggests that it has become increasingly difficult to find well-trained, entry-level ground water hydrologists to fill open positions in consulting firms and regulatory agencies. The future prospects for filling positions that require training in ground water hydrology are assessed by considering three factors: the market, the numbers of qualified students entering colleges and universities, and the aging of the existing workforce. The environmental and water resources consulting industry has seen continuous albeit variable growth, and demand for environmental scientists and hydrologists is expected to increase significantly. Conversely, students' interest and their enrollment in hydrology and water resources programs have waned in recent years, and the interests of students within these departments have shifted away from ground water hydrology in some schools. This decrease in the numbers of U.S. students graduating in hydrology or emphasizing ground water hydrology is coinciding with the aging of and pending retirement of ground water scientists and engineers in the baby boomer generation. We need to both trigger the imagination of students at the elementary school level so that they later want to apply science and math and communicate the career opportunities in ground water hydrology to those high school and college graduates who have acquired the appropriate technical background. Because the success of a consulting firm, research organization, or regulatory agency is derived from the skills and judgment of the employees, human resources will be an increasingly more critical strategic issue for many years.

  12. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  13. Evaluation of sampling equipment for RCRA [Resource Conservation and Recovery Act] monitoring in a deep unconfined aquifer

    International Nuclear Information System (INIS)

    Kasper, R.B.; Serkowski, J.A.

    1988-02-01

    Acceptable sampling devices identified include gas-operated bladder pumps and bailers constructed of nonreactive materials. In arid portions of the western United States, depths to ground water, which are often greater than 100 feet, make the use of bailers extremely time consuming. The efficiency of gas-operated bladder pumps decreases with depth, and special design and construction is often needed to accommodate higher gas pressures. Commercially available sampling pumps were evaluated for their suitability as sampling and purging equipment for installation in monitoring wells in a deep, unconfined aquifer. The test was conducted in a well where the depth to ground water was 340 feet. The objective was to identify equipment capable of discharge rates suitable for sampling (∼0.025 gpm) and, if possible, for purging (>1 gpm). The potential for physical or chemical alteration of the water sample was evaluated from literature sources and not specifically tested. Four positive-displacement pumps were tested, consisting of two bladder pumps, a gas-driven piston pump, and a mechanically-driven pump. All pumps could be installed in a 2-inch diameter well, although this was not important for the planned application. 4 refs., 1 tab

  14. Seismic fragility curves of bridge piers accounting for ground motions in Korea

    Science.gov (United States)

    Nguyen, Duy-Duan; Lee, Tae-Hyung

    2018-04-01

    Korea is located in a slight-to-moderate seismic zone. Nevertheless, several studies pointed that the peak earthquake magnitude in the region can be reached to approximately 6.5. Accordingly, a seismic vulnerability evaluation of the existing structures accounting for ground motions in Korea is momentous. The purpose of this paper is to develop seismic fragility curves for bridge piers of a steel box girder bridge equipped with and without base isolators based on a set of ground motions recorded in Korea. A finite element simulation platform, OpenSees, is utilized to perform nonlinear time history analyses of the bridges. A series of damage states is defined based on a damage index which is expressed in terms of the column displacement ductility ratio. The fragility curves based on Korean motions were thereafter compared with the fragility curves generated using worldwide earthquakes to assess the effect of the two ground motion groups on the seismic fragility curves of the bridge piers. The results reveal that both non- and base-isolated bridge piers are less vulnerable during the Korean ground motions than that under worldwide earthquakes.

  15. Utilization of aging program results in plant inspections

    International Nuclear Information System (INIS)

    Gunther, W.; Fullwood, R.

    1989-01-01

    Research conducted under the auspices of the US Nuclear Regulatory Commission Nuclear Plant Aging Research (NPAR) Program has resulted in a large data base of component and system operating experience. This data base has been used to determine equipment aging susceptibility and the potential for equipment aging to impact plant safety and reliability. Methods of detecting and mitigating component and system aging have also been identified. This paper discusses how the NPAR results could be used to focus inspection activities on age-sensitive components and systems and on the specific modes and mechanisms of age degradation. These activities range from the regular inspections conducted by resident inspectors to extensive special inspections such as the Safety System Functional Inspection typically conducted by a team of inspectors. 5 refs., 3 figs., 1 tab

  16. Utilization of aging program results in plant inspections

    International Nuclear Information System (INIS)

    Gunther, W.; Fullwood, R.

    1988-01-01

    Research conducted under the auspices of the US Nuclear Regulatory Commission Nuclear Plant Aging Research (NPAR) Program has resulted in a large data base of component and system operating experience. This data base has been used to determine equipment aging susceptibility and the potential for equipment aging to impact plant safety and reliability. Methods of detecting and mitigating component and system aging have also been identified. This paper discusses how the NPAR results could be used to focus inspection activities on age-sensitive components and systems and on the specific modes and mechanisms of age degradation. These activities range from the regular inspections conducted by resident inspectors to extensive special inspections such as the Safety System Functional Inspection typically conducted by a team of inspectors. 5 refs., 3 figs., 1 tab

  17. Effectiveness of mat Pilates or equipment-based Pilates in patients with chronic non-specific low back pain: a protocol of a randomised controlled trial

    Directory of Open Access Journals (Sweden)

    da Luz Maurício Antônio

    2013-01-01

    Full Text Available Abstract Background Chronic low back pain is an expensive and difficult condition to treat. One of the interventions widely used by physiotherapists in the treatment of chronic non-specific low back pain is exercise therapy based upon the Pilates principles. Pilates exercises can be performed with or without specific equipment. These two types of Pilates exercises have never been compared on a high-quality randomised controlled trial. Methods/design This randomised controlled trial with a blinded assessor will evaluate eighty six patients of both genders with chronic low back pain, aged between 18 and 60 years, from one Brazilian private physiotherapy clinic. The patients will be randomly allocated into two groups: Mat Group will perform the exercises on the ground while the Equipment-based Group will perform the Pilates method exercises on the following equipment: Cadillac, Reformer, Ladder Barrel, and Step Chair. The general and specific disability of the patient, kinesiophobia, pain intensity and global perceived effect will be evaluated by a blinded assessor before randomisation and at six weeks and six months after randomisation. In addition, the expectation of the participants and their confidence with the treatment will be evaluated before randomisation and after the first treatment session, respectively. Discussion This will be the first study aiming to compare the effectiveness of Mat and Equipment-based Pilates exercises in patients with chronic non-specific low back pain. The results may help health-care professionals in clinical decision-making and could potentially reduce the treatment costs of this condition. Trial registration Brazilian Registry of Clinical Trials RBR-7tyg5j

  18. Soundness confirmation through cold test of the system equipment of HTTR

    International Nuclear Information System (INIS)

    Ono, Masato; Shinohara, Masanori; Iigaki, Kazuhiko; Tochio, Daisuke; Nakagawa, Shigeaki; Shimazaki, Yosuke

    2014-01-01

    HTTR was established at the Oarai Research and Development Center of Japan Atomic Energy Agency, for the purpose of the establishment and upgrading of high-temperature gas-cooled reactor technology infrastructure. Currently, it performs a safety demonstration test in order to demonstrate the safety inherent in high-temperature gas-cooled reactor. After the Great East Japan Earthquake, it conducted confirmation test for the purpose of soundness survey of facilities and equipment, and it confirmed that the soundness of the equipment was maintained. After two years from the confirmation test, it has not been confirmed whether the function of dynamic equipment and the soundness such as the airtightness of pipes and containers are maintained after receiving the influence of damage or deterioration caused by aftershocks generated during two years or aging. To confirm the soundness of these facilities, operation under cold state was conducted, and the obtained plant data was compared with confirmation test data to evaluate the presence of abnormality. In addition, in order to confirm through cold test the damage due to aftershocks and degradation due to aging, the plant data to compare was supposed to be the confirmation test data, and the evaluation on abnormality of the plant data of machine starting time and normal operation data was performed. (A.O.)

  19. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  20. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  1. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  2. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  3. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  4. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  5. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  6. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  7. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  8. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  9. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  10. A Study of Equipment Accuracy and Test Precision in Dual Energy X-ray Absorptiometry

    International Nuclear Information System (INIS)

    Dong, Kyung Rae; Kim, Ho Sung; Jung, Woon Kwan

    2008-01-01

    Because there is a difference depending on the environment as for an inspection equipment the important part of bone density scan and the precision/accuracy of a tester, the management of quality must be made systematically. The equipment failure caused by overload effect due to the aged equipment and the increase of a patient was made frequently. Thus, the replacement of equipment and additional purchases of new bone density equipment caused a compatibility problem in tracking patients. This study wants to know whether the clinical changes of patient's bone density can be accurately and precisely reflected when used it compatibility like the existing equipment after equipment replacement and expansion. Two equipment of GE Lunar Prodigy Advance(P1 and P2) and the Phantom HOLOGIC Spine Road(HSP) were used to measure equipment precision. Each device scans 20 times so that precision data was acquired from the phantom(Group 1). The precision of a tester was measured by shooting twice the same patient, every 15 members from each of the target equipment in 120 women(average age 48.78, 20-60 years old)(Group 2). In addition, the measurement of the precision of a tester and the cross-calibration data were made by scanning 20 times in each of the equipment using HSP, based on the data obtained from the management of quality using phantom(ASP) every morning (Group 3). The same patient was shot only once in one equipment alternately to make the measurement of the precision of a tester and the cross-calibration data in 120 women(average age 48.78, 20-60 years old)(Group 4). It is steady equipment according to daily Q.C Data with 0.996 g/cm 2 , change value(%CV) 0.08. The meanSD and a %CV price are ALP in Group 1(P1 : , , P2 : , %CV=0.192). The mean±SD and a %CV price are P1 : 1.064±0.002 g/cm 2 , %CV=0.190 g/cm 2 , P2 : 1.061±0.003 g/cm 3 , %CV=0.163 in Group 2. The average error±2SD and %CV are P1 - (spine: 0.001±0.013 g/cm 2 , %CV=0.94, Femur: 0.001±0.019 g/cm 2 , %CV

  11. A Study of Equipment Accuracy and Test Precision in Dual Energy X-ray Absorptiometry

    Energy Technology Data Exchange (ETDEWEB)

    Dong, Kyung Rae [Dept. of Radiological Technology, Gwangju Health College, Gwangju (Korea, Republic of); Kim, Ho Sung [Dept. of Nuclear Medicine, Asan Medical Center, Seoul (Korea, Republic of); Jung, Woon Kwan [Dept. of Nuclear Energy Technology, Chosun University, Gwangju (Korea, Republic of)

    2008-03-15

    Because there is a difference depending on the environment as for an inspection equipment the important part of bone density scan and the precision/accuracy of a tester, the management of quality must be made systematically. The equipment failure caused by overload effect due to the aged equipment and the increase of a patient was made frequently. Thus, the replacement of equipment and additional purchases of new bone density equipment caused a compatibility problem in tracking patients. This study wants to know whether the clinical changes of patient's bone density can be accurately and precisely reflected when used it compatibility like the existing equipment after equipment replacement and expansion. Two equipment of GE Lunar Prodigy Advance(P1 and P2) and the Phantom HOLOGIC Spine Road(HSP) were used to measure equipment precision. Each device scans 20 times so that precision data was acquired from the phantom(Group 1). The precision of a tester was measured by shooting twice the same patient, every 15 members from each of the target equipment in 120 women(average age 48.78, 20-60 years old)(Group 2). In addition, the measurement of the precision of a tester and the cross-calibration data were made by scanning 20 times in each of the equipment using HSP, based on the data obtained from the management of quality using phantom(ASP) every morning (Group 3). The same patient was shot only once in one equipment alternately to make the measurement of the precision of a tester and the cross-calibration data in 120 women(average age 48.78, 20-60 years old)(Group 4). It is steady equipment according to daily Q.C Data with 0.996 g/cm{sup 2}, change value(%CV) 0.08. The meanSD and a %CV price are ALP in Group 1(P1 : , , P2 : , %CV=0.192). The mean{+-}SD and a %CV price are P1 : 1.064{+-}0.002 g/cm{sup 2}, %CV=0.190 g/cm{sup 2}, P2 : 1.061{+-}0.003 g/cm{sup 3}, %CV=0.163 in Group 2. The average error{+-}2SD and %CV are P1 - (spine: 0.001{+-}0.013 g/cm{sup 2}, %CV=0

  12. Exploration Challenges: Transferring Ground Repair Techniques to Space Flight Application

    Science.gov (United States)

    McLemore, Carole A.; Kennedy, James P.; Rose, Frederick A.; Evans, Brian W.

    2007-01-01

    Fulfilling NASA's Vision for Space Exploration will demand an extended presence in space at distances from our home planet that exceed our current experience in space logistics and maintenance. The ability to perform repairs in lieu of the customary Orbital Replacement Unit (ORU) process where a faulty part is replaced will be elevated from contingency to routine to sustain operations. The use and cost effectiveness of field repairs for ground based operations in industry and the military have advanced with the development of technology in new materials, new repair techniques and new equipment. The unique environments, accessibility constraints and Extra Vehicular Activity (EVA) issues of space operations will require extensive assessment and evolution of these technologies to provide an equivalent and expected level of assurance to mission success. Challenges include the necessity of changes in design philosophy and policy, extremes in thermal cycling, disruptive forces (such as static charge and wind entrainment) on developed methods for control of materials, dramatically increased volatility of chemicals for cleaning and other compounds due to extremely low pressures, the limits imposed on dexterity and maneuverability by current EVA equipment and practices, and the necessity of unique verification methodology. This paper describes these challenges in and discusses the effects on the established ground techniques for repair. The paper also describes the leading repair methodology candidates and their beneficial attributes for resolving these issues with the evolution of technology.

  13. Development of automatic ultrasonic testing equipment for reactor pressure vessel

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Kee Ok; Park, Dae Yung; Park, Moon Hoh; Koo, Kil Mo; Park, Kwang Heui; Kang, Sang Sin; Bang, Heui Song; Noh, Heui Choong; Kong, Woon Sik [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-08-01

    The selected weld areas of reactor pressure vessel and adjacent piping are examined by remote mechanized ultrasonic testing(MUT) equipment. Since the MUT equipment was purchased from Southwest Research Institute (SwRI) in April 1985, we have performed 15 inservice inspections and 5 preservice inspections. However, the reliability of examination was recently decreased rapidly as the problems which results from the old age of equipment and the frequent movement to plant site to site have occurred frequently. Therefore, the 3-axis control system hardware in occurring many problems among the equipments of mechanized ultrasonic testing (MUT) was designed and developed to cover the examination areas of nozzle-shell weld as specified in ASME Code Section XI and to improve the examination reliability. The new 3-axis control system hardware with the performance of this project was developed to be compatible with the old one and it was used as dual system or spare parts of the old system. Furthermore, the established technologies are expected to be applied to the similar control systems in nuclear power plant. 17 figs, 2 pix, 2 tabs, 10 refs. (Author).

  14. Development of automatic ultrasonic testing equipment for reactor pressure vessel

    International Nuclear Information System (INIS)

    Jang, Kee Ok; Park, Dae Yung; Park, Moon Hoh; Koo, Kil Mo; Park, Kwang Heui; Kang, Sang Sin; Bang, Heui Song; Noh, Heui Choong; Kong, Woon Sik

    1994-08-01

    The selected weld areas of reactor pressure vessel and adjacent piping are examined by remote mechanized ultrasonic testing(MUT) equipment. Since the MUT equipment was purchased from Southwest Research Institute (SwRI) in April 1985, we have performed 15 inservice inspections and 5 preservice inspections. However, the reliability of examination was recently decreased rapidly as the problems which results from the old age of equipment and the frequent movement to plant site to site have occurred frequently. Therefore, the 3-axis control system hardware in occurring many problems among the equipments of mechanized ultrasonic testing (MUT) was designed and developed to cover the examination areas of nozzle-shell weld as specified in ASME Code Section XI and to improve the examination reliability. The new 3-axis control system hardware with the performance of this project was developed to be compatible with the old one and it was used as dual system or spare parts of the old system. Furthermore, the established technologies are expected to be applied to the similar control systems in nuclear power plant. 17 figs, 2 pix, 2 tabs, 10 refs. (Author)

  15. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  16. Ground Vibration Attenuation Measurement using Triaxial and Single Axis Accelerometers

    Science.gov (United States)

    Mohammad, A. H.; Yusoff, N. A.; Madun, A.; Tajudin, S. A. A.; Zahari, M. N. H.; Chik, T. N. T.; Rahman, N. A.; Annuar, Y. M. N.

    2018-04-01

    Peak Particle Velocity is one of the important term to show the level of the vibration amplitude especially traveling wave by distance. Vibration measurement using triaxial accelerometer is needed to obtain accurate value of PPV however limited by the size and the available channel of the data acquisition module for detailed measurement. In this paper, an attempt to estimate accurate PPV has been made by using only a triaxial accelerometer together with multiple single axis accelerometer for the ground vibration measurement. A field test was conducted on soft ground using nine single axis accelerometers and a triaxial accelerometer installed at nine receiver location R1 to R9. Based from the obtained result, the method shows convincing similarity between actual PPV with the calculated PPV with error ratio 0.97. With the design method, vibration measurement equipment size can be reduced with fewer channel required.

  17. Monitoring Strategies of Earth Dams by Ground-Based Radar Interferometry: How to Extract Useful Information for Seismic Risk Assessment.

    Science.gov (United States)

    Di Pasquale, Andrea; Nico, Giovanni; Pitullo, Alfredo; Prezioso, Giuseppina

    2018-01-16

    The aim of this paper is to describe how ground-based radar interferometry can provide displacement measurements of earth dam surfaces and of vibration frequencies of its main concrete infrastructures. In many cases, dams were built many decades ago and, at that time, were not equipped with in situ sensors embedded in the structure when they were built. Earth dams have scattering properties similar to landslides for which the Ground-Based Synthetic Aperture Radar (GBSAR) technique has been so far extensively applied to study ground displacements. In this work, SAR and Real Aperture Radar (RAR) configurations are used for the measurement of earth dam surface displacements and vibration frequencies of concrete structures, respectively. A methodology for the acquisition of SAR data and the rendering of results is described. The geometrical correction factor, needed to transform the Line-of-Sight (LoS) displacement measurements of GBSAR into an estimate of the horizontal displacement vector of the dam surface, is derived. Furthermore, a methodology for the acquisition of RAR data and the representation of displacement temporal profiles and vibration frequency spectra of dam concrete structures is presented. For this study a Ku-band ground-based radar, equipped with horn antennas having different radiation patterns, has been used. Four case studies, using different radar acquisition strategies specifically developed for the monitoring of earth dams, are examined. The results of this work show the information that a Ku-band ground-based radar can provide to structural engineers for a non-destructive seismic assessment of earth dams.

  18. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  19. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  20. Development of single-well techniques for quantitative ground water studies

    International Nuclear Information System (INIS)

    Bachmat, Y.; Bugayevsky, M.; Mandel, S.; Behrens, H.; Drost, W.; Klotz, D.; Moser, H.

    1984-02-01

    The signle-well pulse technique was modified in such manner that the dispersivity of the ground water bearing strata can be derived from the measured results. An outline of the theoretical fundamentals is followed by solutions to apparative problems, i.e. tracer selection (Br-82, colour), set-up of measuring points, etc.. The method was tested in the laboratory and in a test field. Suitable, quick methods of evaluation were developed and the technical equipment was optimized for routine application. The method was tested in wells in Israel. (HP) [de

  1. A comparison of the different regulatory requirements of NPP in vertical ground motion

    International Nuclear Information System (INIS)

    Hou Chunlin; Pan Rong; Yang Yu; Wang Shuguo; Li Xiaojun

    2015-01-01

    Based on the importance of vertical motion in the nuclear power plants (NPPs) and equipment identification of seismic test, we summarize the existing laws and regulations cited by China's NPPs in the vertical seismic ground motion of the regulations. Then, according to the interpretation of various laws and regulations content, we may identified four vertical earthquake response spectrums. Finally, combined with the seismic safety requirements of China NPPs evaluation and the vertical seismic design of M310, EPR, AP1000 and CAP1400 pressurized water reactor, we explain that the vertical seismic ground motion selection should distinguish the effects between near field and far field earthquake, the existing regulations and specifications that China used are still required to further improve on the selection of vertical ground motion. The results of this study can provide reference for seismic design of China's nuclear power plant and nuclear safety review. (authors)

  2. Equipment and performance upgrade of compact nuclear simulator

    International Nuclear Information System (INIS)

    Park, J. C.; Kwon, K. C.; Lee, D. Y.; Hwang, I. K.; Park, W. M.; Cha, K. H.; Song, S. J.; Lee, J. W.; Kim, B. G.; Kim, H. J.

    1999-01-01

    The simulator at Nuclear Training Center in KAERI became old and has not been used effectively for nuclear-related training and researches due to the problems such as aging of the equipment, difficulties in obtaining consumables and their high cost, and less personnel available who can handle the old equipment. To solve the problems, this study was performed for recovering the functions of the simulator through the technical design and replacement of components with new ones. As results of this study, our test after the replacement showed the same simulation status as the previous one, and new graphic displays added to the simulator was effective for the training and easy for maintenance. This study is meaningful as demonstrating the way of upgrading nuclear training simulators that lost their functioning due to the obsolescence of simulators and the unavailability of components

  3. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  4. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  5. Magnetic field mapping equipment for KEK 1 m hydrogen bubble chamber magnet

    International Nuclear Information System (INIS)

    Otake, Yuji

    1979-01-01

    Magnetic field mapping was carried out for the 1 m hydrogen bubble chamber magnet in November, 1976, and March, 1977 at the National Laboratory for High Energy Physics (KEK). The magnetic field mapping equipment was manufactured for the main purposes of getting low cost and short time in manufacture, sufficient accuracy of measurement, fairly fast speed of measurement and automatic measurement. The design was made, aiming at 18 kgauss of field intensity and 10 -3 of measuring accuracy. The magnetic field mapping system consists of seven parts as shown in the block diagram. The measuring elements are Hall elements, and three elements are mounted on three surfaces of the inner wall so that three directional (X, Y and Z) components can be determined by moving the magnetic field mapping equipment. The control circuit of the equipment regulates the shift of the equipment by 5 cm step in X and Y directions. Other circuits, relays and switches are explained. Since 100 V AC power relays were placed together with TTL's and IC's in this system, relay circuits became serious noise sources. The countermeasures such as separation of IC power supply, independent grounding, are suppression and so on were taken. Of these, it was effective that relay circuit and IC circuit were put in respective shield cases, and wirings in both circuits were made so as not to intersect each other as far as possible. Finally the points to be noticed in manufacturing, obtained from the experiences, are summarized. (Wakatsuki, Y.)

  6. Common data buffer system. [communication with computational equipment utilized in spacecraft operations

    Science.gov (United States)

    Byrne, F. (Inventor)

    1981-01-01

    A high speed common data buffer system is described for providing an interface and communications medium between a plurality of computers utilized in a distributed computer complex forming part of a checkout, command and control system for space vehicles and associated ground support equipment. The system includes the capability for temporarily storing data to be transferred between computers, for transferring a plurality of interrupts between computers, for monitoring and recording these transfers, and for correcting errors incurred in these transfers. Validity checks are made on each transfer and appropriate error notification is given to the computer associated with that transfer.

  7. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  8. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  9. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  10. Site Selection for Hvdc Ground Electrodes

    Science.gov (United States)

    Freire, P. F.; Pereira, S. Y.

    2014-12-01

    High-Voltage Direct Current (HVDC) transmission systems are composed of a bipole transmission line with a converter substation at each end. Each substation may be equipped with a HVDC ground electrode, which is a wide area (up to 1 km Ø) and deep (from 3 to 100m) electrical grounding. When in normal operation, the ground electrode will dissipate in the soil the unbalance of the bipole (~1.5% of the rated current). When in monopolar operation with ground return, the HVDC electrode will inject in the soil the nominal pole continuous current, of about 2000 to 3000 Amperes, continuously for a period up to a few hours. HVDC ground electrodes site selection is a work based on extensive geophysical and geological surveys, in order to attend the desired design requirements established for the electrodes, considering both its operational conditions (maximum soil temperature, working life, local soil voltage gradients etc.) and the interference effects on the installations located up to 50 km away. This poster presents the geophysical investigations conducted primarily for the electrodes site selection, and subsequently for the development of the crust resistivity model, which will be used for the interference studies. A preliminary site selection is conducted, based on general geographical and geological criteria. Subsequently, the geology of each chosen area is surveyed in detail, by means of electromagnetic/electrical geophysical techniques, such as magnetotelluric (deep), TDEM (near-surface) and electroresistivity (shallow). Other complementary geologic and geotechnical surveys are conducted, such as wells drilling (for geotechnical characterization, measurement of the water table depth and water flow, and electromagnetic profiling), and soil and water sampling (for measurement of thermal parameters and evaluation of electrosmosis risk). The site evaluation is a dynamic process along the surveys, and some sites will be discarded. For the two or three final sites, the

  11. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  12. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  13. Communication grounding facility

    International Nuclear Information System (INIS)

    Lee, Gye Seong

    1998-06-01

    It is about communication grounding facility, which is made up twelve chapters. It includes general grounding with purpose, materials thermal insulating material, construction of grounding, super strength grounding method, grounding facility with grounding way and building of insulating, switched grounding with No. 1A and LCR, grounding facility of transmission line, wireless facility grounding, grounding facility in wireless base station, grounding of power facility, grounding low-tenton interior power wire, communication facility of railroad, install of arrester in apartment and house, install of arrester on introduction and earth conductivity and measurement with introduction and grounding resistance.

  14. Ground movements associated with gas hydrate production

    International Nuclear Information System (INIS)

    Siriwardane, H.J.; Kutuk, B.

    1992-03-01

    This report deals with a study directed towards a modeling effort on production related ground movements and subsidence resulting from hydrate dissociation. The goal of this research study was to evaluate whether there could be subsidence related problems that could be an impediment to hydrate production. During the production of gas from a hydrate reservoir, it is expected that porous reservoir matrix becomes more compressible which may cause reservoir compression (compaction) under the influence of overburden weight. The overburden deformations can propagate its influence upwards causing subsidence near the surface where production equipment will be located. In the present study, the reservoir compaction is modeled by using the conventional ''stress equilibrium'' approach. In this approach, the overburden strata move under the influence of body force (i.e. self weight) in response to the ''cavity'' generated by reservoir depletion. The present study is expected to provide a ''lower bound'' solution to the subsidence caused by hydrate reservoir depletion. The reservoir compaction anticipated during hydrate production was modeled by using the finite element method, which is a powerful computer modeling technique. The ground movements at the reservoir roof (i.e. reservoir compression) cause additional stresses and disturbance in the overburden strata. In this study, the reservoir compaction was modeled by using the conventional ''stress equilibrium'' approach. In this approach, the overburden strata move under the influence of body force (i.e. self weight) in response to the ''cavity'' generated by reservoir depletion. The resulting stresses and ground movements were computed by using the finite element method. Based on the parameters used in this investigation, the maximum ground subsidence could vary anywhere from 0.50 to 6.50 inches depending on the overburden depth and the size of the depleted hydrate reservoir

  15. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  16. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  17. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  18. Ethnic and sex differences in ownership of preventive health equipment among rural older adults with diabetes.

    Science.gov (United States)

    Bell, Ronny A; Arcury, Thomas A; Stafford, Jeanette M; Golden, Shannon L; Snively, Beverly M; Quandt, Sara A

    2007-01-01

    Diabetes self-management is important for achieving successful health outcomes. Different levels of self-management have been reported among various populations, though little is known about ownership of equipment that can enhance accomplishment of these tasks. This study examined diabetes self-management equipment ownership among rural older adults. Participants included African American, American Indian, and white men and women 65 years of age and older. Data included equipment ownership overall and by ethnicity and sex across diabetes self-management domains (glucose monitoring, foot care, medication adherence, exercise, and diet). Associations between equipment ownership and demographic and health characteristics were assessed using logistic regression. Equipment ownership ranged from 85.0% for blood glucose meters to less than 11% for special socks, modified dishes, and various forms of home exercise equipment. Equipment ownership was associated with ethnicity, living arrangements, mobility, poverty status, and formal education. Rural older adults with diabetes are at risk because they lack equipment to perform some self-management tasks. Providers should be sensitive to and assist patients in overcoming this barrier.

  19. A report on the investigation of aging qualification by means of industrial standards

    International Nuclear Information System (INIS)

    Gradin, L.P.; Farina, T.C.

    1985-01-01

    It is a requirement to show that age sensitive safety-related electrical equipment in a nuclear power plant must perform its safety functions satisfactorily at any time during the life of a plant. Naturally or artificially aged equipment is usually used in type test programs for demonstration of performance or an analysis performed which is supported by partial test data. These Methods often become costly and burdensome tasks or cannot be repeated on test sample equipment to duplicate installed equipment no longer in manufacture. This report describes an alternative approach to determining the expected life of electrical equipment by use of general (non-nuclear) industry standards. The commercial electrical industry has developed a technical basis to use the generally accepted Arrhenius aging methodology. This methodology is not used as an absolute, but as a tool for comparison with successful past history using methods which have evolved over decades

  20. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  1. Development of requirements for seismic upgrading of equipment of existing WWER-440 and WWER-1000 type NPPs

    International Nuclear Information System (INIS)

    Kaznovsky, S.; Ostretsov, I.

    1993-01-01

    The change in seismology data and safety demands a necessity arose for seismic upgrading of the existing operating NPPs of WWER type which have been originally designed and built without or with simplifies calculations of seismic influences. The paper describes the traditional methods and approaches and calculation-experimental method for examining and ensuring of equipment seismic resistance at the NPPs directly. Method of ground explosions is included as well

  2. In-flight and ground testing of single event upset sensitivity in static RAMs

    International Nuclear Information System (INIS)

    Johansson, K.; Dyreklev, P.; Granbom, B.; Calvet, C.; Fourtine, S.; Feuillatre, O.

    1998-01-01

    This paper presents the results from in-flight measurements of single event upsets (SEU) in static random access memories (SRAM) caused by the atmospheric radiation environment at aircraft altitudes. The memory devices were carried on commercial airlines at high altitude and mainly high latitudes. The SEUs were monitored by a Component Upset Test Equipment (CUTE), designed for this experiment. The in flight results are compared to ground based testing with neutrons from three different sources

  3. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  4. Examination of Below-Ground Structure and Soil Respiration Rates of Stable and Deteriorating Salt Marshes in Jamaica Bay (NY)

    Science.gov (United States)

    CAT scan imaging is currently being used to examine below-ground peat and root structure in cores collected from salt marshes of Jamaica Bay, part of the Gateway National Recreation Area (NY). CAT scans or Computer-Aided Tomography scans use X-ray equipment to produce multiple i...

  5. Estimation of component redundancy in optimal age maintenance

    OpenAIRE

    Siopa, Jorge; Garção, José; Silva, Júlio

    2012-01-01

    The classical Optimal Age-Replacement defines the maintenance strategy based on the equipment failure consequences. For severe consequences an early equipment replacement is recommended. For minor consequences the repair after failure is proposed. One way of reducing the failure consequences is the use of redundancies, especially if the equipment failure rate is decreasing over time, since in this case the preventive replacement does not reduce the risk of failure. The estimation of an ac...

  6. Service quality improvement of ground staff at Don Mueang International Airport

    Directory of Open Access Journals (Sweden)

    Sittichai Sricharoenpramong

    2018-01-01

    Full Text Available The purposes of this research were to: 1 evaluate the service quality of the ground staff at Don Mueang International Airport (DMK, 2 compare the ground staff quality service perception of Thai passengers at DMK, and 3 provide guidelines for service quality improvement of the DMK airlines ground staff. A sample size of 400 Thai domestic passengers was accidentally selected at DMK. A questionnaire was used as a research tool for data collection. Five dimensions of service quality were evaluated: reliability, responsiveness, assurance, empathy, and tangibles. It was found that the service quality of ground staff was moderate. The highest dimension of service quality realization was tangibles, followed successively by reliability, assurance, empathy, and responsiveness. The passengers' perception of the ground staff's service quality varied by gender and age group. Guidelines were proposed for the improvement of ground staff service quality at DMK based on the findings. Keywords: airport, ground staff, quality of service

  7. A ground moving target emergency tracking method for catastrophe rescue

    Science.gov (United States)

    Zhou, X.; Li, D.; Li, G.

    2014-11-01

    In recent years, great disasters happen now and then. Disaster management test the emergency operation ability of the government and society all over the world. Immediately after the occurrence of a great disaster (e.g., earthquake), a massive nationwide rescue and relief operation need to be kicked off instantly. In order to improve the organizations efficiency of the emergency rescue, the organizers need to take charge of the information of the rescuer teams, including the real time location, the equipment with the team, the technical skills of the rescuers, and so on. One of the key factors for the success of emergency operations is the real time location of the rescuers dynamically. Real time tracking methods are used to track the professional rescuer teams now. But volunteers' participation play more and more important roles in great disasters. However, real time tracking of the volunteers will cause many problems, e.g., privacy leakage, expensive data consumption, etc. These problems may reduce the enthusiasm of volunteers' participation for catastrophe rescue. In fact, the great disaster is just small probability event, it is not necessary to track the volunteers (even rescuer teams) every time every day. In order to solve this problem, a ground moving target emergency tracking method for catastrophe rescue is presented in this paper. In this method, the handheld devices using GPS technology to provide the location of the users, e.g., smart phone, is used as the positioning equipment; an emergency tracking information database including the ID of the ground moving target (including the rescuer teams and volunteers), the communication number of the handheld devices with the moving target, and the usually living region, etc., is built in advance by registration; when catastrophe happens, the ground moving targets that living close to the disaster area will be filtered by the usually living region; then the activation short message will be sent to the selected

  8. Ground Pollution Science

    International Nuclear Information System (INIS)

    Oh, Jong Min; Bae, Jae Geun

    1997-08-01

    This book deals with ground pollution science and soil science, classification of soil and fundamentals, ground pollution and human, ground pollution and organic matter, ground pollution and city environment, environmental problems of the earth and ground pollution, soil pollution and development of geological features of the ground, ground pollution and landfill of waste, case of measurement of ground pollution.

  9. Natural isotope technique for the exploration and exploitation of ground water

    International Nuclear Information System (INIS)

    Zainal Abidin; Hudi Hastowo; Aang Hanafiah

    2007-01-01

    In line with the condition of climate and hydrology, Indonesia has a fast amount of aquifers which are sources of ground water. In several areas large number of springs occurred with small to large debits which is a sign of ground water potential. Ground water is a potential reservoir to be use at maximum for several purposes such as drinking water, industry and tourism. Large cities such as Jakarta, Bandung and others depend on ground water for their industries and hotels. The exploitation of ground water use has to be controlled and monitoring of a management system have to be done. Research carried out only on the exploitation of geophysics and hydrology showed that the amount of ground water reservoirs is not enough to be used when it comes to justification to explore it. Other parameters are still be needed which are the origins and dating of the ground water, these last two factors mentioned have to be taken into consideration in the system of conversion and balance of water. An alternative technology to determine the two factors mentioned in a short time is the natural isotope technique of 18 O, 2 H and 14 C. This technique is used to determine the origin of water, and isotope 14 C is carried out to determine the age of ground water. Isotopes 18 H and 2 H are stable isotopes in the form of water and is integrated in the hydrological cycle. Their specific concentrations in rain water at several elevations are used as fingerprints to locate the area of ground water supplement and its origin. Isotope 14 C is a natural radioactive isotope with a half-life of 5.730 years and is found in the hydrology cycle and enters the ground water system through CO 2 gas which is dissolved in water. 14 C isotope could determine the age of ground water and is also able to indicate the potential/amount of ground water. Studies of exploration and exploration monitoring of ground water should be an integrated study by geohydrology, geophysics and isotope and could be a solution of

  10. Comparison between agricultural and urban ground-water quality in the Mobile River Basin

    Science.gov (United States)

    Robinson, James L.

    2003-01-01

    . Samples from 8 of the agricultural wells and all 30 urban wells were age dated using analyses of chlorofluorocarbon, sulfur hexafluoride, and dissolved gases. Ground water sampled from the agricultural wells ranged in age from about 14 to 34 years, with a median age of about 18.5 years. Ground water sampled from the urban wells ranged in age from about 1 to 45 years, with a median age of about 12 years. The ages estimated for the ground water are consistent with the geology and hydrology of the study area and the design of the wells. All of the agricultural and urban wells sampled for this study produce water from the shallow aquifer that overlies and recharges the Black Warrior River aquifer, or from the uppermost unit of the Black Warrior River aquifer. The wells are located in the same physiographic setting, have similar depths, and the water collected from the wells had a similar range in age. Statistically significant differences in ground-water quality beneath the agricultural and urban areas can reasonably be attributed to the effects of land use. Ground water from the agricultural wells typically had acidic pH values and low specific conductance and alkalinity values. The water contained few dissolved solids, and typically had small concentrations of ions. Some of the agricultural ground-water contained concentrations of ammonia, nitrite plus nitrate, phosphorus, orthophosphate, and dissolved organic carbon in concentrations that exceeded those typically found in ground water. Pesticides were detected in ground water collected from 25 of the 29 agricultural wells. Nineteen different pesticide compounds were detected a total of 83 times. Herbicides were the most frequently detected class of pesticides. The greatest concentration of any pesticide was an estimated value of 1.4 microgram per liter of fluometuron. The Wilcoxan rank sum test was used to determine statistically significant differences in water quality between the agricultural and urba

  11. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...

  12. 1968 Listing of Swimming Pool Equipment.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  13. Justifying a Set of Basic Characteristics of High Temperature Cold Accumulators in Their Designing for the Ground-Based Systems

    Directory of Open Access Journals (Sweden)

    E. S. Khromov

    2015-01-01

    Full Text Available The ground-based systems use a wide variety of heat-emitting equipment. For temperature control of equipment and facilities, the thermal management systems (TMS are included in the ground-based systems. However, in operation, the off-nominal situations with increased heat emission are possible. To avoid overheating of equipment or environment in facilities, where equipment is placed, is possible through completing a set of TMS by high-temperature cold accumulators (CA.When filling CA by thermal accumulating materials (TAM with change in phase at the temperature level exceeding the ambient temperature, CA integration in TMS is simplified and the need to increase the cooling capacity of the sources of its cold is eliminated. Among the known multiple-cycle TAMs with change in phase "melting-solidification" in a set of characteristics, the most promising are crystal hydrates of salts and their systems, as well as paraffin, especially clean. However, advantages and disadvantages of these classes of TAM are different and disable us to develop a generic version of the CA design.The objective of this work is to identify a set of the main characteristics that significantly affect the CA efficiency. To achieve the goal is used a mathematical simulation of heat exchange and phase change processes, using CA with intermediate coolant as an example. Simulation is based on generation and solution of the system of equations of a thermal balance for the coolant circulating through the inner tube of CA container. The system of equations is solved using Excel tools.Varying values of studied characteristics and generalization of results allowed to us define a following set: TAM thermal conductivity, temperature difference in the coolant – TAM system, TAM container dimensions. The results can be applied when developing a CA, as a part of the "TMS-CA heat generation facility" of the ground-based systems with a specified heat absorption capacity at given temperature

  14. Analysis of the extension and reduction method of qualified life used in equipment with ambiental qualification

    International Nuclear Information System (INIS)

    Serrano R, M.L. .e -mail: mlserrano@cnsns.gob.mx

    2005-01-01

    With the purpose of reducing costs of acquisition, maintenance, design, hour-man, dose, production, etc. or by changes in the temperature of service, diverse Nuclear Plants (NP) in the world have been carried out extensions and reductions of life of equipment and/or components related with the safety. The used methods are mainly tests type on equipment or component aged quickly, tests type on equipment or component aged naturally and use of the Arrhenius model with monitoring of temperatures in place. The present article carries out an analysis of the Arrhenius model with monitoring of temperatures in place, which is presented in two variants, equation (1) and (2), since it is the but used by the NP with extension purposes and reduction of qualified life. As back information, it was made one search of investigations, applied to diverse fields of the science that try about the reliability of the results provided by Arrhenius for the aging case. The results of the analysis indicate: I) that this method make uncertainties in some intervals of temperature and 2) which of the two variants it provides data more reliable. (Author)

  15. Unique aspects of downhill ski injuries part 1: epidemiology and equipment.

    Science.gov (United States)

    Buck, P G; Sophocles, A M; Beckenbauch, R D

    1982-03-01

    Skiing is an exciting sport with a significant potential /or serious injury. This potential for injury can be minimized but never entirely eliminated by modern safety equipment.Upper extremity injuries have become relatively more common as the incidence of lower extremity injuries has decreased. Ankle and foot injuries have become infrequent since the advent of the rigid plastic boot, while the incidence of knee injuries has remained essentially constant.Three major mechanisms of injury to the lower extremity include external rotation and abduction, forward fall, and internal rotation. Each mechanism can produce a distinctive set of injured structures.The "skier at risk" is characterized by a lower level of ability, lighter weight, and extremes of age. Injuries can be minimized by purchasing good quality equipment and maintaining it properly; discarding obsolete equipment; using ski brakes, antifriction devices and pistol grip poles; using multirelease bindings for beginners or intermediates; good physical conditioning; taking ski lessons and coupling this with skiing experience; and skiing in control and using common sense on the slopes.Areas which need the most improvement in equipment design include multi-release bindings suitable for all skiers and children's boots. Copyright 2013, SLACK Incorporated.

  16. DEA (data envelopment analysis)-assisted supporting measures for ground coupled heat pumps implementing in Italy: A case study

    International Nuclear Information System (INIS)

    Longo, L.; Colantoni, A.; Castellucci, S.; Carlini, M.; Vecchione, L.; Savuto, E.; Pallozzi, V.; Di Carlo, A.; Bocci, E.; Moneti, M.; Cocchi, S.; Boubaker, K.

    2015-01-01

    Nowadays, the increasing of the energy consumption is producing serious global warming issues. Mainly most of greenhouse gas emissions in developed countries come from building equipments. In this context, GCHPs (ground coupled heat pumps) are candidate solution as air conditioning systems in buildings due to their higher efficiency compared to conventional devices. Actually, ground coupled heat pump systems are widely, recognized among the most efficient and comfortable used systems. Nevertheless, economic efficiency of the ground coupled heat pumps has to be proved. In this study, DEA (data envelopment analyses) method is applied to a real case in Italy. - Highlights: • Original investigation in terms of energy demands in buildings. • Gathering conjoint classical and scientific analyses. • Presenting original DEA (data envelopment analysis) economic optimization scheme analyses. • Outlining economical feasibility of an efficient low enthalpy-geothermal plant with GCHP (ground coupled heat pump) exchangers.

  17. Geology and ground-water resources of Goshen County, Wyoming; Chemical quality of the ground water

    Science.gov (United States)

    Rapp, J.R.; Visher, F.N.; Littleton, R.T.; Durum, W.H.

    1957-01-01

    Goshen County, which has an area of 2,186 square miles, lies in southeastern Wyoming. The purpose of this study was to evaluate the ground-water resources of the county by determining the character, thickness, and extent of the waterbearing materials; the source, occurrence, movement, quantity, and quality of the ground water; and the possibility of developing additional ground water. The rocks exposed in the area are sedimentary and range in age from Precambrian to Recent. A map that shows the areas of outcrop and a generalized section that summarizes the age, thickness, physical character, and water supply of these formations are included in the report. Owing to the great depths at which they lie beneath most of the county, the formations older than the Lance formation of Late Cretaceous age are not discussed in detail. The Lance formation, of Late Cretaceous age, which consists mainly of beds of fine-grained sandstone and shale, has a maximum thickness of about 1,400 feet. It yields water, which usually is under artesian pressure, to a large number of domestic and stock wells in the south-central part of the county. Tertiary rocks in the area include the Chadron and Brule formations of Oligocene age, the Arikaree formation of Miocene age, and channel deposits of Pliocene age. The Chadron formation is made up of two distinct units: a lower unit of highly variegated fluviatile deposits that has been found only in the report area; and an upper unit that is typical of the formation as it occurs in adjacent areas. The lower unit, which ranges in thickness from a knife edge to about 95 feet, is not known to yield water to wells, but its coarse-grained channel deposits probably would yield small quantities of water to wells. The upper unit, which ranges in thickness from a knife edge to about 150 feet, yields sufficient quantities of water for domestic and stock uses from channel deposits of sandstone under artesian pressure. The Brule formation, which is mainly a

  18. 29 CFR 1926.952 - Mechanical equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment that are not covered with insulating protective equipment. (c) Derrick trucks, cranes and other lifting equipment. (1) All derrick trucks, cranes and other lifting equipment shall comply with subpart N...

  19. Ageing of instrumentation and control cables in NPPs

    International Nuclear Information System (INIS)

    Santhosh; Ghosh, A.K.; Fernandes, B.G.

    2011-01-01

    Cables are vital components of instrumentation and control (I and C) systems in nuclear power plants (NPPs). The polymer materials used for insulation and jacket materials for electric cables are susceptible to ageing and degradation mechanisms caused by exposure to many of the stressors encountered in NPP service conditions. Ageing of components in NPP is an important concern since the degradation caused by ageing can impact the performance of susceptible equipment. This is of particular concern for safety-related equipment since the failure due to ageing can compromise the continued safe operation of the plant. The state-of-the art for incorporating cable ageing effects into probabilistic safety assessment (PSA) is still evolving and in the reliability assessment of NPP systems, the ageing effect of electrical cable is generally not considered and also, there is no standard method exists for incorporating such ageing effects into the system reliability. Therefore, identification and quantification of ageing of electrical cables is very much essential for an accurate prediction of system reliability for PSA applications. The objective of this study is to develop a methodology to assess the susceptibility of polymeric cable insulation to various ageing mechanisms; and the state of the insulation at any chosen time in order to evaluate the remaining life-time of operating cables in NPPs. This paper presents the state-of-the-art tools and techniques for insulation condition assessment, insulation life prediction methodologies, equipment qualification guidelines, and ageing management programs relating to I and C cables in NPPs. An approach to calculate the insulation resistance subjecting to different stressors has also been presented in this paper. (author)

  20. Spatial and temporal distribution of cotton squares and small cotton bolls fallen on ground after damage by boll weevil and the efficiency of the equipment used to collect them

    Directory of Open Access Journals (Sweden)

    Carlos Alberto Domingues da Silva

    Full Text Available ABSTRACT: In this study, we determined the spatial and temporal distribution of fallen cotton squares and small cotton bolls fallen damaged by boll weevil and the efficiency and time interval of the equipment used to collect cotton samples. Spatial and temporal distribution of cotton squares and small cotton bolls fallen on the soil damaged by boll weevil among cotton rows was determined in an experimental design of randomized blocks in a factorial arrangement of 4x3, represented by soil surface tracks located at 1-11cm, 12-22cm, 23-33cm, and 34-44cm away from the planting row of cotton plants 70, 85, and 100 days of age. Efficiency and collection time interval of the cotton samples fallen on the soil infested by boll weevil by plastic rakes that were straight or fan-shaped, big broom, collector instrument model CNPA and aspirator of leaves ‘Trapp’ were determined in randomized block design with five treatments, 10 repetitions for each. Results demonstrated that the collection of cotton samples must be performed with greater attention to soil strips located below the cotton top projection and aspirator ‘Trapp’ of leaves was more appropriate for the operation as it used less time of collection with similar efficiency to other available equipment.

  1. Technology transfer equipment qualification methodology for shelf life determination

    International Nuclear Information System (INIS)

    Anderson, J.W.

    1995-01-01

    Discussions with a number of Nuclear Utilities revealed that equipment qualified for 10 to 40 years in the harsh environment of the plant was being assigned shelf lives of only 5 to 10 years in the benign environment of the warehouse, and then the materials were being trashed. One safety-related equipment supplier was assigning a 10-year qualified life, from date of shipment, with no recognition of the difference in the aging rate in the plant vs. that in the warehouse. Many suppliers assign shelf lives based on product warranty considerations rather than actual product degradation. An EPRI program was initiated to evaluate the methods used to assign shelf lives and to adapt the Arrhenius methodology, used in equipment qualification, to assign technically justifiable shelf lives. Temperature is the main factor controlling shelf life; however, atmospheric pressure, humidity, ultraviolet light, ozone and other atmospheric contaminants were also considered. A list of 70 representative materials was addressed in the program. All of these were found to have shelf lives of 14 years to greater than 60 years, except for 19 items. For 18 of these items, there was no data available except for the manufacturer's recommendation

  2. Ground-water resources of north-central Connecticut

    Science.gov (United States)

    Cushman, Robert Vittum

    1964-01-01

    The term 'north-central Connecticut' in this report refers to an area of about 640 square miles within the central lowland of the Connecticut River basin north of Middletown. The area is mostly a broad valley floor underlain by unconsolidated deposits of Pleistocene and Recent age which mantle an erosional surface formed on consolidated rocks of pre-Triassic and Triassic age. The mean annual precipitation at Hartford, near the center of the area, is 42.83 inches and is uniformly distributed throughout the year. The average annual streamflow from the area is about 22 inches or about half the precipitation. The consolidated water-bearing formations are crystalline rocks of pre-Triassic age and sedimentary and igneous rocks of the Newark group of Triassic age. The crystalline rocks include the Middletown gneiss, the Maromas granite gneiss, the Glastonbury granite-gneiss of Rice and Gregory (1906), and the Bolton schist which form the basement complex and the Eastern Upland of north-central Connecticut. Enough water for domestic, stock, and small commercial use generally can be obtained from the crystalline rocks. Recoverable ground water occurs in the interconnected joints and fracture zones and is yielded in amounts ranging from 29 to 35 gpm (gallons per minute) to wells ranging in depth from 29 to 550 feet. The sedimentary rocks of Triassic age underlie all the Connecticut River Lowland and are predominantly arkosic sandstone and shale. Water supplies sufficient for domestic, stock, and small commercial use can be obtained from shallow wells penetrating these rocks, and larger supplies sufficient for industries and smaller municipalities can probably be obtained from deeper wells. Reported yields range from ? to 578 gpm; the larger yields are generally obtained from wells between 300 and 600 feet in depth. Yields are larger where the overlying material is sand and gravel or where the rocks are well fractured. The igneous rocks of Triassic age are basalt and have

  3. Engineering evaluation of the 618-9 Burial Ground expedited response action

    International Nuclear Information System (INIS)

    1991-08-01

    Throughout Hanford Site history, chemical waste products were disposed via burial in trenches. One such trench was the 618-9 Burial Ground, located in the 600 Area on the Hanford Site. The 618-9 Burial Ground was suspected to contain approximately 5,000 ga (19,000 L) of uranium contaminated solvent in 55-gal (208-L) steel drums. On December 20, 1990, the US Department of Energy (DOE) was instructed by the US Environmental Protection Agency (EPA) and the State of Washington Department of Ecology (Ecology) to initiate planning necessary to implement an expedited response action (ERA) for the 618-9 Burial Ground. The project was to be implemented in two phases: (1) removal of immediate human health and environmental hazards and (2) remediation of contaminated soil. Phase 1 of the project was initiated February 15, 1991. During Phase 1 activities approximately 700 gal (2,650 L) of methyl isobutyl ketone (hexone) and 900 gal (3,400 L) of kerosene solvent were removed from the 618-9 Burial Ground. A significant amount of scrap process equipment/building debris was excavated. The results of an environmental risk assessment for chemicals above detection further determined that risks posed by other detected constituents to human health and the environment are negligible. A compilation of activities utilized for determining subsequent remediation activities for the 618-9 Burial Ground is presented. This includes: (1) Phase 1 activities, (2) sampling performed and associated data results, (3) results of the risk assessment, and (4) applicable or relevant and appropriate requirements. 13 refs., 5 figs., 4 tabs

  4. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  5. Towards a strengthening of inspections carried out on pressurised equipment and pipework..

    International Nuclear Information System (INIS)

    Noel, St.

    2010-01-01

    Following the fast presidential election, a major restructuring of the administrative landscape was set in motion. Tasks that historically were the responsibility of the Ministry of Industry are now carried out by the Ministry of Sustainable Development, which in particular is responsible for the whole policy to do with the prevention of technological risks. The General Directorate for the Prevention of Risks (Direction generale de la prevention des risques (DGPR)) of this ministry is now responsible for controlling technological risks, opening up new perspectives in terms of managing accidental risks and offering a new opportunity for an 'integrated' approach, making it possible to deal with an industrial installation in all its facets. Within the DGPR, the Office for the Safety of Industrial Equipment (bureau de la securite des equipements industriels (BSEI)) is responsible for the safety of pressurised equipment, as well as pipes carrying gas, inflammable liquids and chemical products. After a quick presentation of the inspections carried out on this equipment, issues to do with their safety will be dealt with and in particular: - the suitability of inspections carried out in the tight of faults that are likely to occur and develop in the structures; - control of ageing; - management of the quality of new equipment. (author)

  6. Energy to the Edge (E2E) Equipment Assessment U.S. Army Rapid Equipping Force

    Science.gov (United States)

    2015-05-01

    84 Contents Energy to the Edge • U.S. Army Rapid Equipping Force U.S. Army Rapid Equipping Force 1.0 Executive Summary Executive Summary U.S. Army... audiovisual equipment. • Once radiant barrier liner is inserted, the process of subsequent setups • Cables for lighting and outlets are located...behind the internal barrier • The shelter comes with organic audiovisual equipment. b. • • This shelter has a different setup and tear down process

  7. Information technology equipment cooling method

    Science.gov (United States)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  8. Equipment abnormality monitoring device

    International Nuclear Information System (INIS)

    Ando, Yasumasa

    1991-01-01

    When an operator hears sounds in a plantsite, the operator compares normal sounds of equipment which he previously heard and remembered with sounds he actually hears, to judge if they are normal or abnormal. According to the method, there is a worry that abnormal conditions can not be appropriately judged in a case where the number of objective equipments is increased and in a case that the sounds are changed gradually slightly. Then, the device of the present invention comprises a plurality of monitors for monitoring the operation sound of equipments, a recording/reproducing device for recording and reproducing the signals, a selection device for selecting the reproducing signals among the recorded signals, an acoustic device for converting the signals to sounds, a switching device for switching the signals to be transmitted to the acoustic device between to signals of the monitor and the recording/reproducing signals. The abnormality of the equipments can be determined easily by comparing the sounds representing the operation conditions of equipments for controlling the plant operation and the sounds recorded in their normal conditions. (N.H.)

  9. Simulation of ground-water flow and land subsidence in the Antelope Valley ground-water basin, California

    Science.gov (United States)

    Leighton, David A.; Phillips, Steven P.

    2003-01-01

    Antelope Valley, California, is a topographically closed basin in the western part of the Mojave Desert, about 50 miles northeast of Los Angeles. The Antelope Valley ground-water basin is about 940 square miles and is separated from the northern part of Antelope Valley by faults and low-lying hills. Prior to 1972, ground water provided more than 90 percent of the total water supply in the valley; since 1972, it has provided between 50 and 90 percent. Most ground-water pumping in the valley occurs in the Antelope Valley ground-water basin, which includes the rapidly growing cities of Lancaster and Palmdale. Ground-water-level declines of more than 200 feet in some parts of the ground-water basin have resulted in an increase in pumping lifts, reduced well efficiency, and land subsidence of more than 6 feet in some areas. Future urban growth and limits on the supply of imported water may continue to increase reliance on ground water. To better understand the ground-water flow system and to develop a tool to aid in effectively managing the water resources, a numerical model of ground-water flow and land subsidence in the Antelope Valley ground-water basin was developed using old and new geohydrologic information. The ground-water flow system consists of three aquifers: the upper, middle, and lower aquifers. The aquifers, which were identified on the basis of the hydrologic properties, age, and depth of the unconsolidated deposits, consist of gravel, sand, silt, and clay alluvial deposits and clay and silty clay lacustrine deposits. Prior to ground-water development in the valley, recharge was primarily the infiltration of runoff from the surrounding mountains. Ground water flowed from the recharge areas to discharge areas around the playas where it discharged either from the aquifer system as evapotranspiration or from springs. Partial barriers to horizontal ground-water flow, such as faults, have been identified in the ground-water basin. Water-level declines owing to

  10. The capacity of sugar beet farms’ machinery and equipment

    Directory of Open Access Journals (Sweden)

    Małgorzata BZOWSKA – BAKALARZ

    2012-12-01

    Full Text Available The survey investigates into equipment of sugar beet farms of the Lublin region, Poland, with machinery – with reference to plantation size and yields. To assess the production potential of the farms, the authors determined the age structure of the machinery owned by the farmers and established the scale of investment in new equipment. The machinery most important for sugar beet production are pre-sowing and post-harvest tillage units, sprayers, seed drills, combine harvesters and self-unloading trailers. In most cases, the surveyed farmers own most of these machines, but they are often obsolete: 37% of them is in operation for more than 15 years. As for the machines dedicated solely to sugar beet growing (harvesters and seeders, their age structure is most unfavourable – 70% of them have been used for over 15 years. A trend towards increasing plantation sizes provides incentives for introducing innovation to cultivation methods. However, the scale of investment in new machinery is small, especially in the case of small and medium-sized farms that dominate in the region. The authors surveyed also the scale of using professional services in the field of tillage processes to determine changes in farming practices.

  11. 40 CFR 31.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 31.32 Section 31.32...

  12. 14 CFR 1273.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Equipment. 1273.32 Section 1273.32...

  13. 29 CFR 1470.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 29 Labor 4 2010-07-01 2010-07-01 false Equipment. 1470.32 Section 1470.32 Labor Regulations...

  14. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section...

  15. Rest-lifetime evaluation of equipment and facilities of NPP Kozloduy 3 and 4 and development of an ageing management program

    International Nuclear Information System (INIS)

    Erve, M.; Schmidt, J.; Kastner, B.; Gledatchev, I.; Sabinov, S.; Stoev, M.; Korneev, V.; Strombach, Y.

    2001-01-01

    The task indicated in the title is part of a comprehensive upgrading program for Units 3 and 4 of the Kozloduy plant executed in a Consortium between Framatome ANP (a Framatome and Siemens company) and the Russian company Atomstroyexport. It comprises an evaluation of the residual service life of components/systems/plants subject to acceptance by international experts, identifying the need for further investigations/calculations in certain cases, and finding solutions for improvements that achieve a consensus of safety and economy. The initial results are: Walkdowns revealed no clear knock-out point for the plants, however there are preliminary hints for necessary further improvements. Investigations of templates taken from the RPV of Unit 1 were started: the results are still preliminary, but can be considered very positive; their transfer to the RPV of Unit 3 would mean that the latest safety analyses of the Unit 3 RPV are conservative. The general work program was successfully applied on the batteries as a pattern for the electrical equipment: parameters for the computer database and proposals for an effective aging management program were addressed. (author)

  16. 13 CFR 143.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Equipment. 143.32 Section 143.32...

  17. 32 CFR 33.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 32 National Defense 1 2010-07-01 2010-07-01 false Equipment. 33.32 Section 33.32 National Defense...

  18. 45 CFR 92.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare...

  19. 15 CFR 24.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32...

  20. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  1. Days individual equipment of protection and professional risks; Equipements de protection individuelle et risques professionnelles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  2. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  3. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  4. Grounded theory.

    Science.gov (United States)

    Harris, Tina

    2015-04-29

    Grounded theory is a popular research approach in health care and the social sciences. This article provides a description of grounded theory methodology and its key components, using examples from published studies to demonstrate practical application. It aims to demystify grounded theory for novice nurse researchers, by explaining what it is, when to use it, why they would want to use it and how to use it. It should enable nurse researchers to decide if grounded theory is an appropriate approach for their research, and to determine the quality of any grounded theory research they read.

  5. Ground cross-modal impedance as a tool for analyzing ground/plate interaction and ground wave propagation.

    Science.gov (United States)

    Grau, L; Laulagnet, B

    2015-05-01

    An analytical approach is investigated to model ground-plate interaction based on modal decomposition and the two-dimensional Fourier transform. A finite rectangular plate subjected to flexural vibration is coupled with the ground and modeled with the Kirchhoff hypothesis. A Navier equation represents the stratified ground, assumed infinite in the x- and y-directions and free at the top surface. To obtain an analytical solution, modal decomposition is applied to the structure and a Fourier Transform is applied to the ground. The result is a new tool for analyzing ground-plate interaction to resolve this problem: ground cross-modal impedance. It allows quantifying the added-stiffness, added-mass, and added-damping from the ground to the structure. Similarity with the parallel acoustic problem is highlighted. A comparison between the theory and the experiment shows good matching. Finally, specific cases are investigated, notably the influence of layer depth on plate vibration.

  6. Nuclear Plant Aging Research (NPAR) program plan: Components, systems, and structures

    International Nuclear Information System (INIS)

    1987-09-01

    The nuclear plant aging research described in this plan is intended to resolve issues related to the aging and service wear of equipment and systems and major components at commercial reactor facilities and their possible impact on plant safety. Emphasis has been placed on identification and characterization of the mechanisms of material and component degradation during service and evaluation of methods of inspection, surveillance, condition monitoring, and maintenance as means of mitigating such effects. Specifically, the goals of the program are as follows: (1) to identify and characterize aging and service wear effects which, if unchecked, could cause degradation of equipment, a systems, and major components and thereby impair plant safety; (2) to identify methods of inspection, surveillance, and monitoring, or of evaluating residual life of equipment, systems, and major components, which will ensure timely detection of significant aging effects prior to loss of safety function; and (3) to evaluate the effectiveness of storage, maintenance, repair, and replacement practices in mitigating the rate and extent of degradation caused by aging and service wear

  7. Residence times and nitrate transport in ground water discharging to streams in the Chesapeake Bay Watershed

    Science.gov (United States)

    Lindsey, Bruce D.; Phillips, Scott; Donnelly, Colleen A.; Speiran, Gary K.; Plummer, Niel; Bohlke, John Karl; Focazio, Michael J.; Burton, William C.; Busenberg, Eurybiades

    2003-01-01

    One of the major water-quality problems in the Chesapeake Bay is an overabundance of nutrients from the streams and rivers that discharge to the Bay. Some of these nutrients are from nonpoint sources such as atmospheric deposition, agricultural manure and fertilizer, and septic systems. The effects of efforts to control nonpoint sources, however, can be difficult to quantify because of the lag time between changes at the land surface and the response in the base-flow (ground water) component of streams. To help resource managers understand the lag time between implementation of management practices and subsequent response in the nutrient concentrations in the base-flow component of streamflow, a study of ground-water discharge, residence time, and nitrate transport in springs throughout the Chesapeake Bay Watershed and in four smaller watersheds in selected hydrogeomorphic regions (HGMRs) was conducted. The four watersheds were in the Coastal Plain Uplands, Piedmont crystalline, Valley and Ridge carbonate, and Valley and Ridge siliciclastic HGMRs.A study of springs to estimate an apparent age of the ground water was based on analyses for concentrations of chlorofluorocarbons in water samples collected from 48 springs in the Chesapeake Bay Watershed. Results of the analysis indicate that median age for all the samples was 10 years, with the 25th percentile having an age of 7 years and the 75th percentile having an age of 13 years. Although the number of samples collected in each HGMR was limited, there did not appear to be distinct differences in the ages between the HGMRs. The ranges were similar between the major HGMRs above the Fall Line (modern to about 50 years), with only two HGMRs of small geographic extent (Piedmont carbonate and Mesozoic Lowland) having ranges of modern to about 10 years. The median values of all the HGMRs ranged from 7 to 11 years. Not enough samples were collected in the Coastal Plain for comparison. Spring samples showed slightly younger

  8. Preliminary Study on Preservation of Scientific and Nuclear Equipment in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Mohd Fauzi Haris; Siti Nurbahyah Hamdan; Saipo Bahari Abdul Ratan

    2016-01-01

    Scientific achievements and technological advances in today undeniably has become more sophisticated with the latest capabilities that have helped human life in either routine or scientific problem solving. But each time the power that created them, every tool, particularly equipment used for experimental and scientific tasks also face the risk of aging and damage either the damage is expected or unexpected. Circumstance or situation depends on the use and care of such a scientific tool. To ensure a scientific tool that can be used for a long shelf life, the appropriate care and maintenance should be concerned about. This paper discusses matters related to scientific equipment and Nuclear Malaysia Nuclear specializes in equipment that is connected to and controlled by a computer in terms of care, use and future planning to ensure that it can be used for an appropriate period of time. (author)

  9. Analysis of payload bay magnetic fields due to dc power multipoint and single point ground configurations

    Science.gov (United States)

    Lawton, R. M.

    1976-01-01

    An analysis of magnetic fields in the Orbiter Payload Bay resulting from the present grounding configuration (structure return) was presented and the amount of improvement that would result from installing wire returns for the three dc power buses was determined. Ac and dc magnetic fields at five points in a cross-section of the bay are calculated for both grounding configurations. Y and Z components of the field at each point are derived in terms of a constant coefficient and the current amplitude of each bus. The dc loads assumed are 100 Amperes for each bus. The ac noise current used is a spectrum 6 db higher than the Orbiter equipment limit for narrowband conducted emissions. It was concluded that installing return wiring to provide a single point ground for the dc Buses in the Payload Bay would reduce the ac and dc magnetic field intensity by approximately 30 db.

  10. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    The polymetallic nodules occur at an average depth of 4500 m. Adequate equipment and techniques are required for the exploration at such depths. Shipboard and various laboratory equipments for the sampling of polymetallic nodules is described...

  11. Study on aging management of fire protection system in nuclear power plant

    International Nuclear Information System (INIS)

    Fang Huasong; Du Yu; Li Jianwen; Shi Haining; Tu Fengsheng

    2010-01-01

    Fire prevention, fire fighting and fire automatic alarms are three aspects which be included in fire protection system in nuclear power plants. The fire protection system can protect personnel, equipment etc in the fire, so their performance will have a direct influence on the safe operation in nuclear power plants. The disabled accidents caused by aging have happened continuously with the extension of time in the fire protection system, which is the major security risk during the running time in nuclear power plants. In view of the importance of fire protection system and the severity of aging problems, the aging are highly valued by the plant operators and related organizations. Though the feedback of operating experience in nuclear power plant, the impact of the fire-fighting equipment aging on system performance and reliability be assessed, the aging sensitive equipment be selected to carry out the aging analysis and to guide the management and maintenance to guarantee the healthy operation in life time of fire protection system in nuclear power plant. (authors)

  12. Competition-strength-dependent ground suppression in figure-ground perception.

    Science.gov (United States)

    Salvagio, Elizabeth; Cacciamani, Laura; Peterson, Mary A

    2012-07-01

    Figure-ground segregation is modeled as inhibitory competition between objects that might be perceived on opposite sides of borders. The winner is the figure; the loser is suppressed, and its location is perceived as shapeless ground. Evidence of ground suppression would support inhibitory competition models and would contribute to explaining why grounds are shapeless near borders shared with figures, yet such evidence is scarce. We manipulated whether competition from potential objects on the ground side of figures was high (i.e., portions of familiar objects were potentially present there) or low (novel objects were potentially present). We predicted that greater competition would produce more ground suppression. The results of two experiments in which suppression was assessed via judgments of the orientation of target bars confirmed this prediction; a third experiment showed that ground suppression is short-lived. Our findings support inhibitory competition models of figure assignment, in particular, and models of visual perception entailing feedback, in general.

  13. 40 CFR 792.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  14. 40 CFR 160.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  15. Equipment installation structure of roof slab for tank type FBR and method of equipment installation

    International Nuclear Information System (INIS)

    Sakai, Takao; Yamakawa, Masanori; Otsuka, Masaya; Sekine, Katsuhisa

    1986-01-01

    Purpose: To reduce equipment thermal stress and deformation by eliminating uneven temperature distribution caused at the equipment through section of the roof slab for the tank FBR, and at the same time, simplify the structure installation. Method: Multiple number of vertical fin projects are fit on the equipment through-section inside wall for the roof slab and the cylindrical equipment peripheral wall, and with these projected fins, the ring space of the through section is vertically divided into multiple sections in the circumferential direction. The vertical fins on the through-section inside wall and the fins on the equipment peripheral wall are contacted with each other by revolving them in the lateral direction. As a result, the natural convection caused by the difference of temperatures in the vertical direction of the ring space becomes a convection within each sector divided, and never generates circumferential circulation, which reduce uneven temperature distribution caused at the equipment through section. (Kawakami, Y.)

  16. Enhancing reactor availability factor by diagnostic monitoring and data acquisition of electrical equipments

    International Nuclear Information System (INIS)

    Singh, G.

    2006-01-01

    Electrical energy has made significant contribution to rapid growth of industrial activity in the country. Development and improvement of energy conversion devices or electrical apparatus have supported the growth. Reliability is probably the most important factor in electrical supply system, not only to give uninterrupted service but to provide an economic supply. Regular diagnostic testing of electrical equipments will make a significant contribution to the reliability of electrical supply. The purpose of diagnostic monitoring is to recognize the development of faults at an early stage, which consequently allows greater freedom to schedule the outages resulting in lower downtime and lower capitalized losses. The insulation constitutes the heart of any electrical/power equipment. The insulation in power equipment in normal condition undergoes certain changes in the physical, chemical, electrical and mechanical properties. The change with respect to time in the presence of an influencing factor, more often a stress (electrical) is referred to as ageing. The deterioration of insulating material plays an important role in the assessing the condition of electrical equipments. The systematic diagnostic tests are also part of the maintenance program to ensure the continued serviceability of electrical equipments, by replacing or repairing the components likely to fail, as revealed by the test. Diagnostic tests are carried out on various electrical equipments for detection of incipient fault, location and judging their severity. (author)

  17. Increasing children's physical activity levels during recess periods in elementary schools: the effects of providing game equipment.

    Science.gov (United States)

    Verstraete, Stefanie J M; Cardon, Greet M; De Clercq, Dirk L R; De Bourdeaudhuij, Ilse M M

    2006-08-01

    During recess, children can be active on a daily basis, making it an important school environmental factor for the promotion of health-related physical activity. The aim of the present study was to investigate the effects of providing game equipment on children's physical activity levels during morning recess and lunch break in elementary schools. Seven elementary schools were randomly assigned to the intervention group (four schools), including 122 children (75 boys, 47 girls, mean age: 10.8 +/- 0.6 years), and to the control group (three schools), including 113 children (46 boys, 67 girls, mean age: 10.9 +/- 0.7 years). Children's activity levels were measured before and three months after providing game equipment, using MTI accelerometers. During lunch break, children's moderate and vigorous physical activity significantly increased in the intervention group (moderate: from 38 to 50%, vigorous: from 10 to 11%), while it decreased in the control group (moderate: from 44 to 39%, vigorous: from 11 to 5%). At morning recess, providing game equipment was effective in increasing children's moderate physical activity (from 41 to 45%), while it decreased in the control group (from 41 to 34%). Providing game equipment during recess periods was found to be effective in increasing children's physical activity levels. This finding suggests that promoting physical activity through game equipment provision during recess periods can contribute to reach the daily activity levels recommended for good health.

  18. Management methodology for pressure equipment

    Science.gov (United States)

    Bletchly, P. J.

    Pressure equipment constitutes a significant investment in capital and a major proportion of potential high-risk plant in many operations and this is particularly so in an alumina refinery. In many jurisdictions pressure equipment is also subject to statutory regulation that imposes obligations on Owners of the equipment with respect to workplace safety. Most modern technical standards and industry codes of practice employ a risk-based approach to support better decision making with respect to pressure equipment. For a management system to be effective it must demonstrate that risk is being managed within acceptable limits.

  19. Regional analysis of ground and above-ground climate

    Science.gov (United States)

    1981-12-01

    The regional suitability of underground construction as a climate control technique is discussed with reference to (1) a bioclimatic analysis of long term weather data for 29 locations in the United States to determine appropriate above ground climate control techniques, (2) a data base of synthesized ground temperatures for the coterminous United States, and (3) monthly dew point ground temperature comparisons for identifying the relative likelihood of condensation from one region to another. It is concluded that the suitability of Earth tempering as a practice and of specific Earth sheltered design stereotypes varies geographically; while the subsurface almost always provides a thermal advantage on its own terms when compared to above ground climatic data, it can, nonetheless, compromise the effectiveness of other, regionally more important climate control techniques. Reviews of above and below ground climate mapping schemes related to human comfort and architectural design, and detailed description of a theoretical model of ground temperature, heat flow, and heat storage in the ground are included. Strategies of passive climate control are presented in a discussion of the building bioclimatic analysis procedure which has been applied in a computer analysis of 30 years of weather data for each of 20 locations in the United States.

  20. Regional analysis of ground and above-ground climate

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    The regional suitability of underground construction as a climate control technique is discussed with reference to (1) a bioclimatic analysis of long-term weather data for 29 locations in the United States to determine appropriate above ground climate control techniques, (2) a data base of synthesized ground temperatures for the coterminous United States, and (3) monthly dew point ground temperature comparisons for identifying the relative likelihood of condensation from one region to another. It is concluded that the suitability of earth tempering as a practice and of specific earth-sheltered design stereotypes varies geographically; while the subsurface almost always provides a thermal advantage on its own terms when compared to above ground climatic data, it can, nonetheless, compromise the effectiveness of other, regionally more important climate control techniques. Also contained in the report are reviews of above and below ground climate mapping schemes related to human comfort and architectural design, and detailed description of a theoretical model of ground temperature, heat flow, and heat storage in the ground. Strategies of passive climate control are presented in a discussion of the building bioclimatic analysis procedure which has been applied in a computer analysis of 30 years of weather data for each of 29 locations in the United States.

  1. 21 CFR 58.61 - Equipment design.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  2. Wireless sensors for predictive maintenance of rotating equipment in research reactors

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2011-01-01

    In 2008-2009, the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) tested the potential of predictive or condition-based maintenance techniques to reduce maintenance costs, minimize the risk of catastrophic failures, and maximize system availability by attaching wireless-based sensors to selected rotating equipment at HFIR. Rotating equipment is an ideal 'test case' for the viability of integrated, online predictive maintenance strategies because motors, bearings, and shafts are ubiquitous in nuclear power plants and because the maintenance methods typically performed on rotating equipment today (such as portable or handheld vibration data collection equipment) are highly labor-intensive. The HFIR project achieved all five of its objectives: (1) to identify rotating machinery of the types used in research reactors and determine their operational characteristics, degradation mechanisms, and failure modes, (2) to establish a predictive maintenance program for rotating equipment in research reactors, (3) to identify wireless sensors that are suitable for predictive maintenance of rotating machinery and test them in a laboratory setting, (4) to establish the requirements and procedures to be followed when implementing wireless sensors for predictive maintenance in research reactors, and (5) to develop a conceptual design for a predictive maintenance system for research reactors based on wireless sensors. The project demonstrated that wireless sensors offer an effective method for monitoring key process conditions continuously and remotely, thereby enhancing the safety, reliability, and efficiency of the aging research reactor fleet.

  3. 21 CFR 866.4540 - Immunonephelometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4540 Immunonephelometer equipment. (a) Identification. Immunonephelometer equipment for clinical use...

  4. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  5. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  6. 21 CFR 866.4520 - Immunofluorometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4520 Immunofluorometer equipment. (a) Identification. Immunofluorometer equipment for clinical use with...

  7. Touch and step potential analysis at 23.9kV to 4.16kV & 13.8kV to 4.16kV distribution substations with pad-mounted transformers, floating grounds, and other exposed ungrounded metal bodies using WinIGS

    Science.gov (United States)

    Guzman, David G.

    An electrical substation is composed of various subsystems that allow for the effective and safe operation of the power grid. One of the subsystems integrating a conventional substation is defined as the ground grid system. This system allows for the effective operation of the power grid and all the electrical equipment connected to it by providing a ground potential reference, commonly known as the system ground. In addition, the ground grid system provides safety to the workers and the public transiting inside or living nearby a substation by reducing the step and touch potential (or voltage) levels present during a system fault. In today's utility industry practices there is an increasing trend for using pad-mounted electrical equipment for substation applications in an effort to construct new or upgrade existing electrical facilities inside limited property spaces. This thesis work presents an analysis for the effects of touch and step voltages at existing distribution substations where 23.9kV to 4.16kV & 13.8kV to 4.16kV pad-mounted transformers and other pad-mounted switchgear was installed to replace the traditional station class equipment. Moreover, this study will expose modeling techniques employed to define and determine the effects of floating grounds and other exposed metal bodies inside or surrounding these substations using WinIGS; this is in an effort to determine any risks of electric shock associated with this type of installations. The results presented in this work are intended to verify the requirements for the ground grid analysis and design for 4.16kV distribution substations with pad-mounted equipment in order to prevent dangerous step and touch voltage levels appearing at these sites during system faults; and ultimately prevent exposing individuals to the risk of an electric shock.

  8. Multiple Lightning Discharges in Wind Turbines Associated with Nearby Cloud-to-Ground Lightning

    DEFF Research Database (Denmark)

    Candela Garolera, Anna; Cummins, Kenneth L.; Madsen, Søren Find

    2015-01-01

    This paper presents the analysis of five events where simultaneous lightning currents were registered in different wind turbines of a wind farm with lightning monitoring equipment installed. Measurements from current monitoring devices installed at the wind turbines and observations from auto......-triggering video cameras were correlated with data from the U.S. National Lighting Detection Network. In all five events, the correlation showed that a cloud-to-ground (CG) lightning stroke with high peak current struck the ground within 10 km of the affected turbines at the time of the currents in the wind...... by the nearby CG strokes, involving mechanisms that vary depending on the polarity of the associated CG stroke. The analysis also suggests that the event of upward lightning from wind turbines triggered by nearby lightning activity occurs very often and therefore it should be considered carefully...

  9. The use of NPAR [Nuclear Plant Aging Research] results in plant inspection activities

    International Nuclear Information System (INIS)

    Gunther, W.; Taylor, J.

    1989-01-01

    The US NRC's Nuclear Plant Aging Research (NPAR) Program is a hardware oriented research program which has produced a large data base of equipment and system operating, maintenance, and testing information. Equipment and systems which have a propensity for age related degradation are identified, and methods for detecting and mitigating aging effects have been evaluated. As plants age, it becomes increasingly important that NRC inspectors be cognizant of plant aging phenomena. This paper describes the NPAR information which can enhance inspection activities, and provides a mechanism for making pertinent research available to the inspectors. 7 refs., 2 figs

  10. Ground penetrating radar utilization in exploring inadequate concrete covers in a new bridge deck

    Directory of Open Access Journals (Sweden)

    Md. Istiaque Hasan

    2014-01-01

    Full Text Available The reinforced concrete cast in place four span deck of a concrete bridge near Roanoke, Texas, was recently completed. Due to possible construction errors, it was suspected that the concrete covers in the deck did not conform to drawings and specifications. A full scale non-destructive evaluation of the concrete covers was carried out using ground penetrating radar (GPR equipment. Cover values were determined from the radargram generated from the scan. The estimated covers were plotted on contour maps. Migration data can substitute the drilling based ground truth data without compromising the concrete cover estimations, except for areas with very high cover values. Areas with high water content may result in inaccurate concrete dielectric constants. Based on the results, significant retrofitting of the bridge deck, such as additional overlay, was recommended.

  11. Generate floor response spectra, Part 2: Response spectra for equipment-structure resonance

    International Nuclear Information System (INIS)

    Li, Bo; Jiang, Wei; Xie, Wei-Chau; Pandey, Mahesh D.

    2015-01-01

    Highlights: • The concept of tRS is proposed to deal with tuning of equipment and structures. • Established statistical approaches for estimating tRS corresponding to given GRS. • Derived a new modal combination rule from the theory of random vibration. • Developed efficient and accurate direct method for generating floor response spectra. - Abstract: When generating floor response spectra (FRS) using the direct spectra-to-spectra method developed in the companion paper, probability distribution of t-response spectrum (tRS), which deals with equipment-structure resonance or tuning, corresponding to a specified ground response spectrum (GRS) is required. In this paper, simulation results using a large number of horizontal and vertical ground motions are employed to establish statistical relationships between tRS and GRS. It is observed that the influence of site conditions on horizontal statistical relationships is negligible, whereas the effect of site conditions on vertical statistical relationships cannot be ignored. Considering the influence of site conditions, horizontal statistical relationship suitable for all site conditions and vertical statistical relationships suitable for hard sites and soft sites, respectively, are established. The horizontal and vertical statistical relationships are suitable to estimate tRS for design spectra in USNRC R.G. 1.60 and NUREG/CR-0098, Uniform Hazard Spectra (UHS) in Western North America (WNA), or any GRS falling inside the valid coverage of the statistical relationship. For UHS with significant high frequency spectral accelerations, such as UHS in Central and Eastern North America (CENA), an amplification ratio method is proposed to estimate tRS. Numerical examples demonstrate that the statistical relationships and the amplification ratio method are acceptable to estimate tRS for given GRS and to generate FRS using the direct method in different practical situations.

  12. Generate floor response spectra, Part 2: Response spectra for equipment-structure resonance

    Energy Technology Data Exchange (ETDEWEB)

    Li, Bo, E-mail: b68li@uwaterloo.ca; Jiang, Wei, E-mail: w46jiang@uwaterloo.ca; Xie, Wei-Chau, E-mail: xie@uwaterloo.ca; Pandey, Mahesh D., E-mail: mdpandey@uwaterloo.ca

    2015-11-15

    Highlights: • The concept of tRS is proposed to deal with tuning of equipment and structures. • Established statistical approaches for estimating tRS corresponding to given GRS. • Derived a new modal combination rule from the theory of random vibration. • Developed efficient and accurate direct method for generating floor response spectra. - Abstract: When generating floor response spectra (FRS) using the direct spectra-to-spectra method developed in the companion paper, probability distribution of t-response spectrum (tRS), which deals with equipment-structure resonance or tuning, corresponding to a specified ground response spectrum (GRS) is required. In this paper, simulation results using a large number of horizontal and vertical ground motions are employed to establish statistical relationships between tRS and GRS. It is observed that the influence of site conditions on horizontal statistical relationships is negligible, whereas the effect of site conditions on vertical statistical relationships cannot be ignored. Considering the influence of site conditions, horizontal statistical relationship suitable for all site conditions and vertical statistical relationships suitable for hard sites and soft sites, respectively, are established. The horizontal and vertical statistical relationships are suitable to estimate tRS for design spectra in USNRC R.G. 1.60 and NUREG/CR-0098, Uniform Hazard Spectra (UHS) in Western North America (WNA), or any GRS falling inside the valid coverage of the statistical relationship. For UHS with significant high frequency spectral accelerations, such as UHS in Central and Eastern North America (CENA), an amplification ratio method is proposed to estimate tRS. Numerical examples demonstrate that the statistical relationships and the amplification ratio method are acceptable to estimate tRS for given GRS and to generate FRS using the direct method in different practical situations.

  13. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  14. Modifying a Commercial Centrifuge to Reduce Electromagnetic Interference and Evaluating Functionality of Ultrasound Equipment

    Science.gov (United States)

    Greening, Gage J.

    2016-01-01

    meet our specifications and to understand what needs to be done in lab to the new centrifuge. Our modifications will provide a standard for readying centrifuges for future missions. Once the new modified centrifuge arrives by the vendor, it will need to undergo EMI testing again for validation. The centrifuge is also in the process of compatibility testing with a custom stowage drawer, which is an ongoing project in SF4. Both of these items will be payloads on future missions to the ISS for various research purposes. Ultrasound: ISS currently has an onboard ultrasound (Ultrasound 2 system) for research and medical purposes. Every piece of medical flight hardware has an equivalent ground-unit so instrumentation can be routinely evaluated and transported to the ISS if necessary. The ground-unit ultrasound equipment must be evaluated every six months using a task performance sheet (TPS). A TPS is a document, written by the appropriate scientists and engineers, which describes how to run equipment and is written in such a way that astronauts with unspecialized training can follow the tasks. I was responsible for performing six TPSs on a combination of three ultrasounds and two video power converters (VPCs). Performing a TPS involves checking out and computationally documenting each piece of equipment removed from storage locations, setting up hardware and software, performing tasks to verify functionality, returning equipment, and logging items back into the computerized system. My work revealed all ground-unit ultrasounds were functioning properly. Because of proper function, a discrepancy report (DR) did not have to be opened. The TPS was then passed along to the Quality Engineering (QE) for review and ultimately given to Quality Assurance (QA). Other projects: In addition to my main projects, I participated in other tasks including troubleshooting an EEG headband, volunteering for an ultrasound training research study, and conformal coating printed circuit boards. My

  15. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  16. NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning

  17. Ground water '89

    International Nuclear Information System (INIS)

    1989-01-01

    The proceedings of the 5th biennial symposium of the Ground Water Division of the Geological Society of South Africa are presented. The theme of the symposium was ground water and mining. Papers were presented on the following topics: ground water resources; ground water contamination; chemical analyses of ground water and mining and its influece on ground water. Separate abstracts were prepared for 5 of the papers presented. The remaining papers were considered outside the subject scope of INIS

  18. HYACE - a novel autoclave coring equipment for systematic offshore gashydrate sampling

    Energy Technology Data Exchange (ETDEWEB)

    Amann, H.; Hohnberg, H.J.; Reinelt, R. [Technische Univ. Berlin (Germany). Inst. fuer Schiffs- und Meerestechnik, Fachgebiet Maritime Technik

    1997-12-31

    HYACE, the acronym for hydrate autoclave coring equipment system, is a research and development project sponsored by the European Union`s Marine Science and Technology Programme MAST. The project was to have started in the fourth quarter of 1997 and is to last 30 months. The main activities of the project will be in the development and prototype testing of an innovative down-hole controlled autoclave coring system. This system will be designed to sample marine sediments at extended down-hole conditions maintaining as many parameters constant as possible. In general terms, the main aim of the project is to contribute to systematic ground truthing of a necessarily ephemeral phenomenon of growing global significance: sampling and analysis of gas hydrates in their natural environment. (MSK)

  19. The CdZnTe Detector with Slit Collimator for Measure Distribution of the Specific Activity Radionuclide in the Ground

    Science.gov (United States)

    Stepanov, V. E.; Volkovich, A. G.; Potapov, V. N.; Semin, I. A.; Stepanov, A. V.; Simirskii, Iu. N.

    2018-01-01

    From 2011 in the NRC "Kurchatov Institute" carry out the dismantling of the MR multiloop research reactor. Now the reactor and all technological equipment in the premises of the reactor were dismantled. Now the measurements of radioactive contamination in the reactor premises are made. The most contaminated parts of premises - floor and the ground beneath it. To measure the distribution of specific activity in the ground the CdZnTe detector (volume 500MM3) was used. Detector placed in a lead shielding with a slit collimation hole. The upper part of shielding is made movable to close and open the slit of the collimator. At each point two measurements carried out: with open and closed collimator. The software for determination specific activity of radionuclides in ground was developed. The mathematical model of spectrometric system based on the Monte-Carlo method. Measurements of specific activity of ground were made. Using the results of measurements the thickness of the removed layer of ground and the amount of radioactive waste were calculated.

  20. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  1. Losing ground--Swedish life expectancy in a comparative perspective.

    Directory of Open Access Journals (Sweden)

    Sven Drefahl

    Full Text Available BACKGROUND: In the beginning of the 1970s, Sweden was the country where both women and men enjoyed the world's longest life expectancy. While life expectancy continues to be high and increasing, Sweden has been losing ground in relation to other leading countries. METHODS: We look at life expectancy over the years 1970-2008 for men and women. To assess the relative contributions of age, causes of death, and smoking we decompose differences in life expectancy between Sweden and two leading countries, Japan and France. This study is the first to use this decomposition method to observe how smoking related deaths contribute to life expectancy differences between countries. RESULTS: Sweden has maintained very low mortality at young and working ages for both men and women compared to France and Japan. However, mortality at ages above 65 has become considerably higher in Sweden than in the other leading countries because the decrease has been faster in those countries. Different trends for circulatory diseases were the largest contributor to this development in both sexes but for women also cancer played a role. Mortality from neoplasms has been considerably low for Swedish men. Smoking attributable mortality plays a modest role for women, whereas it is substantially lower in Swedish men than in French and Japanese men. CONCLUSIONS: Sweden is losing ground in relation to other leading countries with respect to life expectancy because mortality at high ages improves more slowly than in the leading countries, especially due to trends in cardiovascular disease mortality. Trends in smoking rates may provide a partial explanation for the trends in women; however, it is not possible to isolate one single explanatory factor for why Sweden is losing ground.

  2. Effects of ascorbic acid and antioxidants on color, lipid oxidation and volatiles of irradiated ground beef

    International Nuclear Information System (INIS)

    Ahn, D.U.; Nam, K.C.

    2004-01-01

    Beef loins with 3 different aging times after slaughter were ground, added with none, 0.1% ascorbic acid, 0.01% sesamol+0.01% α-tocopherol, or 0.1% ascorbic acid+0.01% sesamol+0.01% tocopherol. The meats were packaged in oxygen-permeable bags, irradiated at 2.5 kGy, and color, oxidation-reduction potential (ORP), lipid oxidation and volatile profiles were determined. Irradiation decreased the redness of ground beef, and visible color of beef changed from a bright red to a green/brown depending on the age of meat. Addition of ascorbic acid prevented color changes in irradiated beef, and the effect of ascorbic acid became greater as the age of meat or storage time after irradiation increased. The ground beef added with ascorbic acid had lower ORP than control, and the low ORP of meat helped maintaining the heme pigments in reduced form. During aerobic storage, S-volatiles disappeared while volatile aldehydes significantly increased in irradiated beef. Addition of ascorbic acid at 0.1% or sesamol+α-tocopherol at each 0.01% level to ground beef prior to irradiation were effective in reducing lipid oxidation and S-volatiles. As storage time increased, however, the antioxidant effect of sesamol+tocopherol in irradiated ground beef was superior to that of ascorbic acid

  3. Effects of ascorbic acid and antioxidants on color, lipid oxidation and volatiles of irradiated ground beef

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, D.U. E-mail: duahn@iastate.edu; Nam, K.C

    2004-10-01

    Beef loins with 3 different aging times after slaughter were ground, added with none, 0.1% ascorbic acid, 0.01% sesamol+0.01% {alpha}-tocopherol, or 0.1% ascorbic acid+0.01% sesamol+0.01% tocopherol. The meats were packaged in oxygen-permeable bags, irradiated at 2.5 kGy, and color, oxidation-reduction potential (ORP), lipid oxidation and volatile profiles were determined. Irradiation decreased the redness of ground beef, and visible color of beef changed from a bright red to a green/brown depending on the age of meat. Addition of ascorbic acid prevented color changes in irradiated beef, and the effect of ascorbic acid became greater as the age of meat or storage time after irradiation increased. The ground beef added with ascorbic acid had lower ORP than control, and the low ORP of meat helped maintaining the heme pigments in reduced form. During aerobic storage, S-volatiles disappeared while volatile aldehydes significantly increased in irradiated beef. Addition of ascorbic acid at 0.1% or sesamol+{alpha}-tocopherol at each 0.01% level to ground beef prior to irradiation were effective in reducing lipid oxidation and S-volatiles. As storage time increased, however, the antioxidant effect of sesamol+tocopherol in irradiated ground beef was superior to that of ascorbic acid.

  4. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  5. Estimating solar radiation using NOAA/AVHRR and ground measurement data

    Science.gov (United States)

    Fallahi, Somayeh; Amanollahi, Jamil; Tzanis, Chris G.; Ramli, Mohammad Firuz

    2018-01-01

    Solar radiation (SR) data are commonly used in different areas of renewable energy research. Researchers are often compelled to predict SR at ground stations for areas with no proper equipment. The objective of this study was to test the accuracy of the artificial neural network (ANN) and multiple linear regression (MLR) models for estimating monthly average SR over Kurdistan Province, Iran. Input data of the models were two data series with similar longitude, latitude, altitude, and month (number of months) data, but there were differences between the monthly mean temperatures in the first data series obtained from AVHRR sensor of NOAA satellite (DS1) and in the second data series measured at ground stations (DS2). In order to retrieve land surface temperature (LST) from AVHRR sensor, emissivity of the area was considered and for that purpose normalized vegetation difference index (NDVI) calculated from channels 1 and 2 of AVHRR sensor was utilized. The acquired results showed that the ANN model with DS1 data input with R2 = 0.96, RMSE = 1.04, MAE = 1.1 in the training phase and R2 = 0.96, RMSE = 1.06, MAE = 1.15 in the testing phase achieved more satisfactory performance compared with MLR model. It can be concluded that ANN model with remote sensing data has the potential to predict SR in locations with no ground measurement stations.

  6. Cooling of electronic equipment

    DEFF Research Database (Denmark)

    A. Kristensen, Anders Schmidt

    2003-01-01

    Cooling of electronic equipment is studied. The design size of electronic equipment decrease causing the thermal density to increase. This affect the cooling which can cause for example failures of critical components due to overheating or thermal induced stresses. Initially a pin fin heat sink...

  7. 46 CFR 180.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Survival craft equipment. 180.175 Section 180.175... TONS) LIFESAVING EQUIPMENT AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 180.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and...

  8. 46 CFR 108.719 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 108.719 Section 108.719... AND EQUIPMENT Miscellaneous Equipment § 108.719 Pilot boarding equipment. (a) This section applies to... vessel must have suitable pilot boarding equipment available for use on each side of the vessel. If a...

  9. 46 CFR 109.347 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  10. Information technology equipment cooling system

    Science.gov (United States)

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  11. Isotope-equipped measuring instruments

    International Nuclear Information System (INIS)

    Miyagawa, Kazuo; Amano, Hiroshi

    1980-01-01

    In the steel industry, though the investment in isotope-equipped measuring instruments is small as compared with that in machinery, they play important role in the moisture measurement in sintering and blast furnaces, the thickness measurement in rolling process and others in automatic control systems. The economic aspect of the isotope-equipped measuring instruments is described on the basis of the practices in Kimitsu Works of Nippon Steel Corporation: distribution of such instruments, evaluation of economic effects, usefulness evaluation in view of raising the accuracy, and usefulness evaluation viewed from the failure of the isotope instruments. The evaluation of economic effects was made under the premise that the isotope-equipped measuring instruments are not employed. Then, the effects of raising the accuracy are evaluated for a γ-ray plate thickness gauge and a neutron moisture gauge for coke in a blast furnace. Finally, the usefulness was evaluated, assuming possible failure of the isotope-equipped measuring instruments. (J.P.N.)

  12. Electronic equipment packaging technology

    CERN Document Server

    Ginsberg, Gerald L

    1992-01-01

    The last twenty years have seen major advances in the electronics industry. Perhaps the most significant aspect of these advances has been the significant role that electronic equipment plays in almost all product markets. Even though electronic equipment is used in a broad base of applications, many future applications have yet to be conceived. This versatility of electron­ ics has been brought about primarily by the significant advances that have been made in integrated circuit technology. The electronic product user is rarely aware of the integrated circuits within the equipment. However, the user is often very aware of the size, weight, mod­ ularity, maintainability, aesthetics, and human interface features of the product. In fact, these are aspects of the products that often are instrumental in deter­ mining its success or failure in the marketplace. Optimizing these and other product features is the primary role of Electronic Equipment Packaging Technology. As the electronics industry continues to pr...

  13. Twenty-third water reactor safety information meeting. Volume 3, structural and seismic engineering, primary systems integrity, equipment operability and aging, ECCS strainer blockage research and regulatory issues

    Energy Technology Data Exchange (ETDEWEB)

    Monteleone, S. [comp.] [Brookhaven National Lab., Upton, NY (United States)

    1996-03-01

    This three-volume report contains papers presented at the Twenty- Third Water Reactor Safety Information Meeting held at the Bethesda Marriott Hotel, Bethesda, Maryland, October 23-25, 1995. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from France, Italy, Japan, Norway, Russia, Sweden, and Switzerland. This document, Volume 3, presents topics in Structural & Seismic Engineering, Primary Systems Integrity, Equipment Operability and Aging, and ECCS Strainer Blockage Research & Regulatory Issues. Individual papers have been cataloged separately.

  14. Twenty-third water reactor safety information meeting. Volume 3, structural and seismic engineering, primary systems integrity, equipment operability and aging, ECCS strainer blockage research and regulatory issues

    International Nuclear Information System (INIS)

    Monteleone, S.

    1996-03-01

    This three-volume report contains papers presented at the Twenty- Third Water Reactor Safety Information Meeting held at the Bethesda Marriott Hotel, Bethesda, Maryland, October 23-25, 1995. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from France, Italy, Japan, Norway, Russia, Sweden, and Switzerland. This document, Volume 3, presents topics in Structural ampersand Seismic Engineering, Primary Systems Integrity, Equipment Operability and Aging, and ECCS Strainer Blockage Research ampersand Regulatory Issues. Individual papers have been cataloged separately

  15. Evaluation of retrieval activities and equipment for removal of containers from the transuranic storage area retrieval enclosure

    International Nuclear Information System (INIS)

    Bannister, R.; Rhoden, G.; Davies, G.B.

    1995-09-01

    Since 1970, the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory has accepted over 55,000 cubic meters of Transuranic contaminated hazardous waste for interim storage. The waste has been neatly stored in ''cell'' configurations on adjoining, above ground asphalt pads at the Transuranic Storage Area (TSA). A number of reports have been supplied for review and comment describing the methodology and equipment proposed for retrieval of drums and boxes from a storage facility at the INEL site. The contract for this review requires two main issues to be addressed. First, the adequacy of equipment and methodology for the retrieval of containers which have been breached, lost structural integrity, or are otherwise damaged, Second, to review the strategies and equipment for retrieval of intact waste containers. These issues are presented in the following report along with additional detail in the methodology to complete the description of the operations required for retrieval under most operational scenarios. The documentation reviewed is considered to be at an interim stage and is therefore expected to be subject to the development of the methodology from the existing level of detail with input from the facility operators. This review aims to anticipate some of this development by providing suggested detailed methods of retrieval and equipment for both normal and abnormal operations

  16. Improved servicing equipment for steam generators

    International Nuclear Information System (INIS)

    Hedtke, James C.

    1998-01-01

    To help keep personnel exposure as low as reasonably achievable and reduce critical path outage time, most nuclear plants of PWR design in the USA are now using improved equipment to service their steam generators (SGs) during outages. Because of the success of this equipment in the USA, two Belgian plants and one English plant have purchased this equipment, and other nuclear plants in Europe are also considering procurement. The improved SG servicing equipment discussed in this paper discusses consists of nozzle dams, segmented multi-stud tensioner, primary manway cover handling tool set, shield door and fastener cleaner. This equipment is specifically designed for the individual plant application and can also be specified for replacement SG projects. All of the equipment can be used without modification of the existing SGs. (author)

  17. Overview of nuclear power plant equipment qualification issues and practices

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report presents a view of and commentary on the current status of equipment qualification (EQ) in nuclear industries of the major western nations. The introductory chapters discuss the concepts of EQ, the elements of EQ process and highlight some of the key issues in EQ. A brief review of industry practices and some of the prevalent industrial standards is presented, followed by an overview of current regulatory positions in the USA, France, Germany and Sweden. A summary and commentary on the latest research findings on issues relating to accident simulation, to aging simulation and some special topics related to EQ, has been contributed by Franklin Research Centre of Philadelphia. The last part of the report deals with equipment qualification in Canada and gives recommendations on EQ for new plants as well as currently operational CANDU nuclear power plants

  18. Development of automatic Ultrasonic testing equipment for reactor pressure vessel

    International Nuclear Information System (INIS)

    Kim, Kor R.; Kim, Jae H.; Lee, Jae C.

    1996-06-01

    The selected weld areas of a reactor pressure vessel and adjacent piping are examined by the remote mechanized ultrasonic testing (MUT) equipment. Since the MUT equipment was purchased from southwest Research Institute (SwRI) in April 1985, 15 inservice inspections and 5 preservice inspections are performed with this MUT equipment. However due to the old age of the equipment and frequent movements to plant sites, the reliability of examination was recently decreased rapidly and it is very difficult to keep spare parts. In order to resolve these problems and to meet the strong request from plant sites, we intend to develop a new 3-axis control system including hardware and software. With this control system, we expect more efficient and reliable examination of the nozzle to shell weld areas, which is specified in ASME Code Section XI. The new 3-axis control system hardware and software were designed and development of our own control system, the advanced technologies of computer control mechanism were established and examination reliability of the nozzle to shell weld area was improved. With the development of our 3-axis control system for PaR ISI-2 computer control system, the reliability of nozzle to shell weld area examination has been improved. The established technologies from the development and detailed analysis of existing control system, are expected to be applied to the similar control systems in nuclear power plants. (author). 12 refs., 4 tabs., 33 figs

  19. Development of automatic Ultrasonic testing equipment for reactor pressure vessel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kor R.; Kim, Jae H.; Lee, Jae C.

    1996-06-01

    The selected weld areas of a reactor pressure vessel and adjacent piping are examined by the remote mechanized ultrasonic testing (MUT) equipment. Since the MUT equipment was purchased from southwest Research Institute (SwRI) in April 1985, 15 inservice inspections and 5 preservice inspections are performed with this MUT equipment. However due to the old age of the equipment and frequent movements to plant sites, the reliability of examination was recently decreased rapidly and it is very difficult to keep spare parts. In order to resolve these problems and to meet the strong request from plant sites, we intend to develop a new 3-axis control system including hardware and software. With this control system, we expect more efficient and reliable examination of the nozzle to shell weld areas, which is specified in ASME Code Section XI. The new 3-axis control system hardware and software were designed and development of our own control system, the advanced technologies of computer control mechanism were established and examination reliability of the nozzle to shell weld area was improved. With the development of our 3-axis control system for PaR ISI-2 computer control system, the reliability of nozzle to shell weld area examination has been improved. The established technologies from the development and detailed analysis of existing control system, are expected to be applied to the similar control systems in nuclear power plants. (author). 12 refs., 4 tabs., 33 figs.

  20. On a method of evaluation of failure rate of equipment and pipings under excess-earthquake loadings

    International Nuclear Information System (INIS)

    Shibata, H.; Okamura, H.

    1979-01-01

    This paper deals with a method of evaluation of the failure rate of equipment and pipings in nuclear power plants under an earthquake which is exceeding the design basis earthquake. If we put the ratio of the maximum ground acceleration of an earthquake to that of the design basis earthquake as n, then the failure rate or the probability of failure is the function of n as p(n). The purpose of this study is establishing the procedure of evaluation of the relation n vs. p(n). (orig.)

  1. Simulation of Ground-Water Flow and Effects of Ground-Water Irrigation on Base Flow in the Elkhorn and Loup River Basins, Nebraska

    Science.gov (United States)

    Peterson, Steven M.; Stanton, Jennifer S.; Saunders, Amanda T.; Bradley, Jesse R.

    2008-01-01

    Irrigated agriculture is vital to the livelihood of communities in the Elkhorn and Loup River Basins in Nebraska, and ground water is used to irrigate most of the cropland. Concerns about the sustainability of ground-water and surface-water resources have prompted State and regional agencies to evaluate the cumulative effects of ground-water irrigation in this area. To facilitate understanding of the effects of ground-water irrigation, a numerical computer model was developed to simulate ground-water flow and assess the effects of ground-water irrigation (including ground-water withdrawals, hereinafter referred to as pumpage, and enhanced recharge) on stream base flow. The study area covers approximately 30,800 square miles, and includes the Elkhorn River Basin upstream from Norfolk, Nebraska, and the Loup River Basin upstream from Columbus, Nebraska. The water-table aquifer consists of Quaternary-age sands and gravels and Tertiary-age silts, sands, and gravels. The simulation was constructed using one layer with 2-mile by 2-mile cell size. Simulations were constructed to represent the ground-water system before 1940 and from 1940 through 2005, and to simulate hypothetical conditions from 2006 through 2045 or 2055. The first simulation represents steady-state conditions of the system before anthropogenic effects, and then simulates the effects of early surface-water development activities and recharge of water leaking from canals during 1895 to 1940. The first simulation ends at 1940 because before that time, very little pumpage for irrigation occurred, but after that time it became increasingly commonplace. The pre-1940 simulation was calibrated against measured water levels and estimated long-term base flow, and the 1940 through 2005 simulation was calibrated against measured water-level changes and estimated long-term base flow. The calibrated 1940 through 2005 simulation was used as the basis for analyzing hypothetical scenarios to evaluate the effects of

  2. Technical basis for environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Wood, R.T.; Hassan, M.; Tanaka, T.J.

    1998-01-01

    This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. The studies were conducted by Oak Ridge National Laboratory (ORNL), Sandia National Laboratories (SNL), and Brookhaven National Laboratory (BNL). The studies address the following: (1) adequacy of the present test methods for qualification of digital I and C systems; (2) preferred (i.e., Regulatory Guide-endorsed) standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging for equipment to be located in a benign environment; and (5) determination of an appropriate approach for addressing the impact of smoke in digital equipment qualification programs. Significant findings from the studies form the technical basis for a recommended approach to the environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

  3. Technical basis for environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Korsah, K.; Wood, R.T. [Oak Ridge National Lab., TN (United States); Hassan, M. [Brookhaven National Lab., Upton, NY (United States); Tanaka, T.J. [Sandia National Labs., Albuquerque, NM (United States)

    1998-01-01

    This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. The studies were conducted by Oak Ridge National Laboratory (ORNL), Sandia National Laboratories (SNL), and Brookhaven National Laboratory (BNL). The studies address the following: (1) adequacy of the present test methods for qualification of digital I and C systems; (2) preferred (i.e., Regulatory Guide-endorsed) standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging for equipment to be located in a benign environment; and (5) determination of an appropriate approach for addressing the impact of smoke in digital equipment qualification programs. Significant findings from the studies form the technical basis for a recommended approach to the environmental qualification of microprocessor-based safety-related equipment in nuclear power plants.

  4. Meeting the latest qualification requirements for Class 1E protection system equipment: a practical approach

    International Nuclear Information System (INIS)

    Daigle, R.P.; Breen, R.J.

    1977-01-01

    The requirements for qualifying Class 1E equipment for Nuclear Power Generating Stations were significantly revised in 1974 and 1975. These new requirements reflect the desire of the industry to provide improved methods of determining the qualification of this vital equipment. The revised standards do, in fact, meet these industry goals in a generally acceptable manner. The Nuclear Regulatory Commission is presently requiring utilities to comply with these revised standards and regulatory guides in order to obtain the necessary permits. Manufacturers are developing and implementing programs to comply with the new requirements. One of the more difficult new requirements of qualification is aging to achieve advanced life condition. The objectives and methods described for aging are difficult for much of the equipment within the Protection System. The use of thermal and vibrational techniques to simulate aging is valid for some components (i.e., capacitors, transistors, cable and/or motor insulation) but may be neither valid nor practical for many items (e.g., complete instrument systems, etc.). A seemingly obvious approach, although rarely followed, in regarding new or revised standards is to refrain from making any type of commitment until the standards are thoroughly understood. Often too hasty a decision is made by a utility (concerned about licensing) or a manufacturer (concerned about being competitive) to commit to new requirements. Consequently, the broad range of interpretations that usually develops for a given set of requirements may result in difficult relations between organizations. This paper deals with solutions for qualification in a practical sense, with emphasis on the aging issue and does not elaborate on seismic qualification

  5. On importance assessment of aging multi-state system

    Science.gov (United States)

    Frenkel, Ilia; Khvatskin, Lev; Lisnianski, Anatoly

    2017-01-01

    Modern high-tech equipment requires precise temperature control and effective cooling below the ambient temperature. Greater cooling efficiencies will allow equipment to be operated for longer periods without overheating, providing a greater return on investment and increased in availability of the equipment. This paper presents application of the Lz-transform method to importance assessment of aging multi-state water-cooling system used in one of Israeli hospitals. The water cooling system consists of 3 principal sub-systems: chillers, heat exchanger and pumps. The performance of the system and the sub-systems is measured by their produced cooling capacity. Heat exchanger is an aging component. Straightforward Markov method applied to solve this problem will require building of a system model with numerous numbers of states and solving a corresponding system of multiple differential equations. Lz-transform method, which is used for calculation of the system elements importance, drastically simplified the solution. Numerical example is presented to illustrate the described approach.

  6. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  7. Recovery from equipment failures in ATC: Determination of contextual factors

    International Nuclear Information System (INIS)

    Subotic, Branka; Ochieng, Washington Y.; Straeter, Oliver

    2007-01-01

    Human reliability assessment (HRA) currently uses various approaches to determine and quantify human error. These approaches are increasingly being employed in various safety-critical domains, such as air traffic management and its ground component air traffic control. HRA research over the years has shown the important role of the context in which human errors take place. Recent techniques now put more emphasis on the definition of key contextual factors and their impact on the reliability of human performance. This paper presents a review of the current understanding of contextual factors in various industries. It uses this together with results from controller interviews to identify the contextual factors relevant to controller recovery from equipment failures in air traffic control. These factors should be used in conjunction with an appropriate method to analyse the performance of a controller during the process of recovery from failures

  8. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  9. Survey and analysis on environmental and electromagnetic effect on instrumentation and control equipment of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, In Koo; Lee, Dong Young; Cha, Kyung Ho

    2001-03-01

    As the instrumentation and control (I and C) equipment suppliers tend to provide digital components rather than conventional analog type components for instrumentation and control systems of nuclear power plants(NPPs), it is unavoidable to adopt digital equipment for safety I and C systems as well as non-safety systems. However, the full introduction of digital equipment for I and C systems of nuclear power plants raises several concerns which have not been considered in conventional analog I and C equipment. The two major examples of the issues of digital systems are environmental/electromagnetic compatibility (EMC) and software reliability. This report presents the survey and research results on environmental and electromagnetic effect on I and C equipment of nuclear power plants to give a guideline for aging management and design process. Electromagnetic site surveys were conducted to be used as a part of technical basis to demonstrate that I and C systems are compatible with the ambient electromagnetic noise in Korean nuclear power plants.

  10. Alternative Fuels Data Center: Biodiesel Equipment Options

    Science.gov (United States)

    Equipment Options to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment Options on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment Options on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment Options on Google Bookmark Alternative Fuels

  11. Methodology for the assessment of possible damages in low voltage equipment due to lightning surges

    Energy Technology Data Exchange (ETDEWEB)

    Matsuo, Nelson M.; Kagan, Nelson [University of Sao Paulo (USP), SP (Brazil)], Emails: matsuonm@usp.br, nelsonk@pea.usp.br; Domingues, Ivo T. [AES Eletropaulo, SP (Brazil); Jesus, Nelson C. de [AES Sul, Porto Alegre, RS (Brazil); Silva, Marcelo H.I. da [Grupo Rede, Sao Paulo, SP (Brazil); Takauti, Edson H. [Bandeirante, Sao Paulo, SP (Brazil)

    2007-07-01

    This paper deals with the development of a methodology to assess the possibility of equipment damages in low voltage customers due to lightning surges. The main objective is to incorporate this methodology in a computation system that supports distribution companies to determine the possible causes of equipment damages claimed by customers and to decide whether the claims are to be reimbursed or not. The proposed methodology determines whether a specific customer could be affected by a lightning strike according to his/her location and to the lightning main parameters, by using data from a lightning detection system and from the specific equipment surge withstand capability. A specific study using ATP (Alternative Transients Program) was carried out to assess the propagation of lightning surges in electric power distribution systems and their impact over low voltage customers. On the other hand, the withstand capability of the main household appliances was determined by a series of tests carried out in the University's power quality laboratory. The paper details the modeling used for simulation, such as network configuration, grounding points, and modelling of insulator flashover, distribution transformer, low voltage loads. It also presents some results regarding the evaluation of over voltages in low voltage customers installations. A practical method is proposed for assessing the possibility of equipment damage and describes how the existing uncertainties were handled. Also, some issues regarding the withstand capability of electric household appliances to lightning surges are discussed and some results of the laboratory tests are presented. (author)

  12. (Environmental investigation of ground water contamination at Wright- Patterson Air Force Base, Ohio)

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    This Health and Safety Plan (HSP) was developed for the Environmental Investigation of Ground-water Contamination Investigation at Wright-Patterson Air Force Base near Dayton, Ohio, based on the projected scope of work for the Phase 1, Task 4 Field Investigation. The HSP describes hazards that may be encountered during the investigation, assesses the hazards, and indicates what type of personal protective equipment is to be used for each task performed. The HSP also addresses the medical monitoring program, decontamination procedures, air monitoring, training, site control, accident prevention, and emergency response.

  13. 7 CFR 1753.68 - Purchasing special equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Purchasing special equipment. 1753.68 Section 1753.68... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of Special Equipment § 1753.68 Purchasing special equipment. (a) General. (1) Equipment purchases are...

  14. Understanding aging - A key to ensuring safety

    International Nuclear Information System (INIS)

    Arlotto, G.A.

    1985-01-01

    The nuclear community has entered a period during which issues related to the advancing age of nuclear power plants will play an ever-increasing role in the decision making process for the continued safe operation of these plants, including extended safe operation beyond the presently authorized forty years. Although progress has been made toward understanding and managing this aging phenomenon, much remains to be done. This paper describes research needs directed toward: (a) systematically identifying those aging effects which could impair safety; (b) assessment of inspection and monitoring methods for detecting aging prior to loss of safety function; and (c) evaluation of effectiveness of maintenance in mitigation aging. To be successful, this research, and its ultimate application, must involve the entire nuclear community - the regulator and the regulated. It must take the advantage of operating experience, include the assessment and tests of aged equipment, and involve coordination of related activities conducted by individual utilities, reactor manufacturers, architect-engineers, equipment suppliers, utility groups that have been (or might be) established, standards-writing bodies, foreign countries, the NRC, other Government agencies, and other knowledgeable organization and persons. The implementation of this research would best be accomplished by obtaining consensus in an open forum of all interested organizations and persons

  15. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  16. Ground Control Point - Wireless System Network for UAV-based environmental monitoring applications

    Science.gov (United States)

    Mejia-Aguilar, Abraham

    2016-04-01

    In recent years, Unmanned Aerial Vehicles (UAV) have seen widespread civil applications including usage for survey and monitoring services in areas such as agriculture, construction and civil engineering, private surveillance and reconnaissance services and cultural heritage management. Most aerial monitoring services require the integration of information acquired during the flight (such as imagery) with ground-based information (such as GPS information or others) for improved ground truth validation. For example, to obtain an accurate 3D and Digital Elevation Model based on aerial imagery, it is necessary to include ground-based information of coordinate points, which are normally acquired with surveying methods based on Global Position Systems (GPS). However, GPS surveys are very time consuming and especially for longer time series of monitoring data repeated GPS surveys are necessary. In order to improve speed of data collection and integration, this work presents an autonomous system based on Waspmote technologies build on single nodes interlinked in a Wireless Sensor Network (WSN) star-topology for ground based information collection and later integration with surveying data obtained by UAV. Nodes are designed to be visible from the air, to resist extreme weather conditions with low-power consumption. Besides, nodes are equipped with GPS as well as Inertial Measurement Unit (IMU), accelerometer, temperature and soil moisture sensors and thus provide significant advantages in a broad range of applications for environmental monitoring. For our purpose, the WSN transmits the environmental data with 3G/GPRS to a database on a regular time basis. This project provides a detailed case study and implementation of a Ground Control Point System Network for UAV-based vegetation monitoring of dry mountain grassland in the Matsch valley, Italy.

  17. Alaka'i Haumana: A Grounded Theory Study to Create a Student Leadership Development Model for a Hawaiian Secondary Private Christian School

    Science.gov (United States)

    Graham, Derrik

    2017-01-01

    The purpose of this qualitative grounded theory study was to create a student leadership development model specific to secondary students in a private Christian Hawaiian school system. The paradigm that guided this study was Kouzes and Posner's (2012) transformational leadership theory as it provides a framework of leaders equipping, encouraging,…

  18. Quantifying Pollutant Emissions from Office Equipment Phase IReport

    Energy Technology Data Exchange (ETDEWEB)

    Maddalena, R.L.; Destaillats, H.; Hodgson, A.T.; McKone, T.E.; Perino, C.

    2006-12-01

    Although office equipment has been a focal point for governmental efforts to promote energy efficiency through programs such as Energy Star, little is known about the relationship between office equipment use and indoor air quality. This report provides results of the first phase (Phase I) of a study in which the primary objective is to measure emissions of organic pollutants and particulate matter from a selected set of office equipment typically used in residential and office environments. The specific aims of the overall research effort are: (1) use screening-level measurements to identify and quantify the concentrations of air pollutants of interest emitted by major categories of distributed office equipment in a controlled environment; (2) quantify the emissions of air pollutants from generally representative, individual machines within each of the major categories in a controlled chamber environment using well defined protocols; (3) characterize the effects of ageing and use on emissions for individual machines spanning several categories; (4) evaluate the importance of operational factors that can be manipulated to reduce pollutant emissions from office machines; and (5) explore the potential relationship between energy consumption and pollutant emissions for machines performing equivalent tasks. The study includes desktop computers (CPU units), computer monitors, and three categories of desktop printing devices. The printer categories are: (1) printers and multipurpose devices using color inkjet technology; (2) low- to medium output printers and multipurpose devices employing monochrome or color laser technology; and (3) high-output monochrome and color laser printers. The literature review and screening level experiments in Phase 1 were designed to identify substances of toxicological significance for more detailed study. In addition, these screening level measurements indicate the potential relative importance of different categories of office equipment

  19. Mountain Pine Beetles, Salvage Logging, and Hydrologic Change: Predicting Wet Ground Areas

    Directory of Open Access Journals (Sweden)

    John Rex

    2013-04-01

    Full Text Available The mountain pine beetle epidemic in British Columbia has covered 18.1 million hectares of forest land showing the potential for exceptionally large-scale disturbance to influence watershed hydrology. Pine stands killed by the epidemic can experience reduced levels of evapotranspiration and precipitation interception, which can translate into an increase in soil moisture as observed by some forest practitioners during salvage logging in the epicenter of the outbreak. They reported the replacement of summer ground, dry firm soil areas, with winter ground areas identified by having wetter, less firm soils upon which forestry equipment operation is difficult or impossible before winter freeze-up. To decrease the likelihood of soil disturbance from harvesting, a set of hazard indicators was developed to predict wet ground areas in areas heavily infested by the mountain pine beetle. Hazard indicators were based on available GIS data, aerial photographs, and local knowledge. Indicators were selected by an iterative process that began with office-based selection of potential indicators, model development and prediction, field verification, and model refinement to select those indicators that explained most field data variability. Findings indicate that the most effective indicators were lodgepole pine content, understory, drainage density, soil texture, and the topographic index.

  20. Connection for transfer of Liquid Nitrogen from High Voltage to ground potential

    DEFF Research Database (Denmark)

    Rasmussen, Claus Nygaard; Hansen, Finn; Willén, Dag

    2001-01-01

    In order to operate a superconducting cable conductor it must be kept at a cryogenic temperature (e.g. using liquid nitrogen). The superconducting cable conductor is at high voltage and the cooling equipment is kept at ground potential. This requires a thermally insulating connection that is also...... properties and withstand towards high-pressure liquid nitrogen. The length per joint is approximately 900 mm, including a Johnstoncoupling. The joints are tested in a closed liquid nitrogen circuit, with a pressure of up to 10 bars. The rated voltage of the cable system is 36 kV (phase-phase)....

  1. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  2. 46 CFR 184.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating equipment...

  3. Ground-water resources of the Acu Valley, Rio Grande Norte, Brazil

    Science.gov (United States)

    Rodis, Harry G.; de Castro Araujo, Jonas Maria.

    1968-01-01

    The Acu Valley is the lower part of the Rio Piranhas valley in the northwestern part of the State of Rio Grande do Norte, Brazil. It begins where the Rio Piranhas leaves the crystalline Precambrian rocks to flow across the outcrop of sedimentary rocks. The area considered in this report extends northward for about 45 kilometers; it is terminated arbitrarily where encroachment by sea water has contaminated the aquifer and imparted a disagreeable saline taste to the water in it. The boundary was not determined in the field, however, for lack of special equipment. Part of the extensive uplands on either side of the valley are included. This makes the total area approximately 2,500 square kilometers. The largest town, Acu, had a population of about 8,000 in 1960. The area is considered to be part of the Drought Polygon of northeast Brazil because the precipitation, although averaging 448 millimeters annually at Acu, varies widely from year to year and often is deficient for many months. The precipitation has been supplemented by use of irrigation wells, but irrigated agriculture is not yet far advanced, and the quantities of water used in irrigation are small. Geologically, the area consists of basement crystalline rocks (Precambrian), a wedge of sedimentary rocks thickening northward (Cretaceous), and alluvial sediments constituting a narrow band in the bottom of the valley (Alluvium and terrace deposits). The crystalline rocks contain water mainly in fractures and, in general, are impermeable. The sedimentary rocks of Cretaceous age comprise two units: a thick but fine-grained sandstone grading upward into siltstone and shale (Acu Sandstone), and limestone and dolomite with an included shale zone (Jandaira Limestone). The sandstone especially and the limestone to a lesser degree are ground-water reservoirs of large capacity. The limestone has been tapped at several places, but the sandstone and its contained water are practically untested and, hence, imperfectly

  4. 40 CFR 1054.626 - What special provisions apply to equipment imported under the Transition Program for Equipment...

    Science.gov (United States)

    2010-07-01

    ... EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND EQUIPMENT Special Compliance Provisions § 1054... provisions of this section and send us an annual report, as follows: (1) Notify the Designated Compliance... and manufacturing equipment. Companies that import equipment into the United States without meeting...

  5. Traditional behaviour and fidelity to caribou calving grounds by barren-ground caribou

    Directory of Open Access Journals (Sweden)

    Anne Gunn

    1986-06-01

    Full Text Available Evidence for the fidelity of female barren-ground caribou (Rangifer tarandus spp. of each herd to specific calving grounds is convincing. Involvement of learned behaviour in the annual return of those cows to the same calving grounds implies such actions are a form of «traditional» behaviour. Even wide variations in population size have not yet knowingly led to marked changes in size or location of calving grounds or prolonged abandonment of established ones. Rarely is the adoption of new calving grounds reported and emigration to another herd's calving ground or interchange between calving grounds has not yet been unequivocally documented. The calving experience of individual caribou and environmental pressures may modify the cow's use patterns of her calving grounds. The current definition of herds based on traditional calving grounds may require modification, if increasing caribou numbers result in changes in traditions. However, current data do not contradict either the fidelity to traditional calving grounds or the concept of herd identity based on that fidelity.

  6. 46 CFR 184.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping...) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking equipment. (a) Doors on a cooking appliance must be provided with hinges and locking devices to prevent...

  7. 46 CFR 121.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be so...

  8. 30 CFR 72.520 - Diesel equipment inventory.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Diesel equipment inventory. 72.520 Section 72... Mines § 72.520 Diesel equipment inventory. (a) The operator of each mine that utilizes diesel equipment underground, shall prepare and submit in writing to the District Manager, an inventory of diesel equipment...

  9. 46 CFR 117.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Survival craft equipment. 117.175 Section 117.175... AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 117.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and efficient for the purpose it...

  10. Baseline risk assessment of ground water contamination at the Monument Valley uranium mill tailings site Cane Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the Monument Valley UMTRA Project site near Cane Valley, Arizona, was completed in 1994. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Adverse ecological and agricultural effects may also result from exposure to contaminated ground water. For example, livestock should not be watered with contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site investigations will be used to determine a compliance strategy to comply with the UMTRA ground water standards.

  11. Baseline risk assessment of ground water contamination at the Monument Valley uranium mill tailings site Cane Valley, Arizona

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the Monument Valley UMTRA Project site near Cane Valley, Arizona, was completed in 1994. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Adverse ecological and agricultural effects may also result from exposure to contaminated ground water. For example, livestock should not be watered with contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site investigations will be used to determine a compliance strategy to comply with the UMTRA ground water standards

  12. Monitoring Hydraulic Fracturing Using Ground-Based Controlled Source Electromagnetics

    Science.gov (United States)

    Hickey, M. S.; Trevino, S., III; Everett, M. E.

    2017-12-01

    Hydraulic fracturing allows hydrocarbon production in low permeability formations. Imaging the distribution of fluid used to create a hydraulic fracture can aid in the characterization of fracture properties such as extent of plume penetration as well as fracture azimuth and symmetry. This could contribute to improving the efficiency of an operation, for example, in helping to determine ideal well spacing or the need to refracture a zone. A ground-based controlled-source electromagnetics (CSEM) technique is ideal for imaging the fluid due to the change in field caused by the difference in the conductive properties of the fluid when compared to the background. With advances in high signal to noise recording equipment, coupled with a high-power, broadband transmitter we can show hydraulic fracture extent and azimuth with minimal processing. A 3D finite element code is used to model the complete well casing along with the layered subsurface. This forward model is used to optimize the survey design and isolate the band of frequencies with the best response. In the field, the results of the modeling are also used to create a custom pseudorandom numeric (PRN) code to control the frequencies transmitted through a grounded dipole source. The receivers record the surface voltage across two grounded dipoles, one parallel and one perpendicular to the transmitter. The data are presented as the displays of amplitude ratios across several frequencies with the associated spatial information. In this presentation, we show multiple field results in multiple basins in the United States along with the CSEM theory used to create the survey designs.

  13. The Advantages and Disadvantages of Seeking Commonality in Military Equipment

    Science.gov (United States)

    2011-01-01

    RAND ReseARch AReAs Children and Families eduCation and the arts energy and environment health and health Care inFrastruCture and transportation... international aFFairs law and Business national seCurity population and aging puBliC saFety sCienCe and teChnology terrorism and homeland seCurity this...rand 2011 www.rand.org The Advantages and Disadvantages of Seeking Commonality in Military Equipment I ncreasingly, the Army and the Department

  14. Compliance testing of medical diagnostic x-ray equipment: three years experience of a public hospital in western Australia

    International Nuclear Information System (INIS)

    Tuchyna, T.; Jacob, C.S.

    2000-01-01

    Full text: A formal compliance testing program which began on 1 January 1997 called for all medical and diagnostic x-ray equipment to be tested according to protocols established by the Western Australian Radiological Council. This work describes the impact of the legislation three years post implementation on a major teaching Hospital with 45 x-ray tubes located throughout 37 rooms. Testing is performed prior to scheduled service by licensed compliance testers according to test methods specified in the Western Australian Compliance Testing Workbook, 1997. A dedicated non-invasive x-ray beam analyser is instrumental in accurately determining radiation output parameters of the generator and x-ray tube. Assessment of compliance is determined by a Qualified Expert. Repair and re-testing of non-compliant items is coordinated with service personnel. Notices of non-compliance were received for approximately 60% of the equipment in the Hospital following the equipment' first annual test. Reasons and seriousness of failure varied according to equipment category, test category, equipment use and age. The majority of non-compliance issues were resolved within 90 days. At the end of the third year of testing, approximately 75% of the x-ray units tested met the compliance criteria. The main reasons for non-compliance were found to be design limitations associated with old technology and the current radiation legislation that makes it difficult for older equipment to meet the stringent criteria. The number and categories of failure did not significantly decrease in the second or third years of testing. Exemptions from compliance criteria have been sought for two units on the basis of age and design. Units unable to meet the criteria following several repair attempts or where the cost of repair was deemed not justified, were decommissioned. Formal testing of medical x-ray equipment has demonstrated various non-compliance issues that did not significantly improve during the

  15. The Cost of Maintaining Educational Communications Equipment.

    Science.gov (United States)

    Humphrey, David A.

    Tentative formulas for calculating the cost of maintaining educational communications equipment are proposed. The formulas are based on a survey of campuses of the State University of New York. The survey analyzed the types of equipment to be maintained, types of maintenance, who uses the equipment, who services the equipment, and the cost…

  16. Protective equipment use among female rugby players.

    Science.gov (United States)

    Comstock, R Dawn; Fields, Sarah K; Knox, Christy L

    2005-07-01

    Our objective was to assess the prevalence of protective equipment use and the motivation for using protective equipment among a sample of US female rugby players. We surveyed a convenience sample of 234 current US female rugby players from 14 teams participating in a US women's rugby tournament, obtaining self-reported demographic, rugby exposure, and protective equipment use information. Mouthguards were the most commonly used piece of protective equipment: 90.8% of players reported having always worn a mouthguard while playing or practicing rugby within their most recent 3 months of play. Fewer than 15% of players reported having always worn other types of protective equipment. Equipment use varied by playing position. Whereas over 80% of players in all other positions always wore a mouthguard, 66.7% of scrum halves reported always wearing one. Both backs and forwards reported wearing shoulder pads, but only forwards reported always wearing padded headgear. Mouthguards, padded headgear, and shoulder pads were worn "to prevent injury," whereas ankle braces, neoprene sleeves, and athletic tape on joints were worn "to protect a current/recent injury." This is the first study of female rugby players to assess the prevalence of protective equipment use by playing position and the motivation for using protective equipment. With the exception of mouthguards, US female rugby players infrequently use protective equipment. Protective equipment use varies by playing position. Some types of protective equipment appear to be used as primary prevention mechanisms, whereas others are used as secondary or tertiary prevention mechanisms.

  17. Automated space processing payloads study. Volume 3: Equipment development resource requirements. [instrument packages and the space shuttles

    Science.gov (United States)

    1975-01-01

    Facilities are described on which detailed preliminary design was undertaken and which may be used on early space shuttle missions in the 1979-1982 time-frame. The major hardware components making up each facility are identified, and development schedules for the major hardware items and the payload buildup are included. Cost data for the facilities, and the assumptions and ground rules supporting these data are given along with a recommended listing of supporting research and technology needed to ensure confidence in the ability to achieve successful development of the equipment and technology.

  18. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  19. 14 CFR 121.605 - Airplane equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 121.605 Section 121.605..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in § 121...

  20. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  1. Experimental Investigation of Rotorcraft Outwash in Ground Effect

    Science.gov (United States)

    Tanner, Philip E.; Overmeyer, Austin D.; Jenkins, Luther N.; Yao, Chung-Sheng; Bartram, Scott M.

    2015-01-01

    The wake characteristics of a rotorcraft are affected by the proximity of a rotor to the ground surface, especially during hover. Ground effect is encountered when the rotor disk is within a distance of a few rotor radii above the ground surface and results in an increase in thrust for a given power relative to that same power condition with the rotor out of ground effect. Although this phenomenon has been highly documented and observed since the beginning of the helicopter age, there is still a relatively little amount of flow-field data existing to help understand its features. Joint Army and NASA testing was conducted at NASA Langley Research Center using a powered rotorcraft model in hover at various rotor heights and thrust conditions in order to contribute to the complete outwash data set. The measured data included outwash velocities and directions, rotor loads, fuselage loads, and ground pressures. The researchers observed a linear relationship between rotor height and percent download on the fuselage, peak mean outwash velocities occurring at radial stations between 1.7 and 1.8 r/R regardless of rotor height, and the measurement azimuthal dependence of the outwash profile for a model incorporating a fuselage. Comparisons to phase-locked PIV data showed similar contours but a more contracted wake boundary for the PIV data. This paper describes the test setup and presents some of the averaged results.

  2. 30 CFR 250.602 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.602 Section 250.602... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Workover Operations § 250.602 Equipment movement. The movement of well-workover rigs and related equipment on and off a platform or from well to well on...

  3. 30 CFR 250.502 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.502 Section 250.502... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Completion Operations § 250.502 Equipment movement. The movement of well-completion rigs and related equipment on and off a platform or from well to well...

  4. 46 CFR 121.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cooking equipment. 121.220 Section 121.220 Shipping... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.220 Cooking equipment. (a) Doors on a cooking appliance... cooking appliance must be installed to prevent movement in heavy seas. (c) For a grill or similar type of...

  5. Combilift ideal for maneuvering oil and gas equipment

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2009-07-15

    This article described an innovative forklift that responds to the oil industry's need for a safer, better and easier way to move long tubular products that cannot be carried high in the air. The Gator Jaw is a duplex pipe clamp attachment that secures to the Combilift forklift carriage. The clamp arm can be hydraulically moved upwards to allow the operator full use of the forks without interference from the hold down arm. The Combilift's platform is ideal for maneuvering oil and gas equipment close to the ground. Since it can travel sideways, the length of the load is not critical. The Gator Jaw's unique design makes it possible for one forklift to handle both skids and pallets. The C-Series product extends to the subsea oil and gas industry, which works with long loads such as oil drilling tools and pipe. The benefits include safer product handling, significant space savings, increased productivity and versatile indoor and outdoor use. The machines are available with a fuel-efficient liquefied petroleum gas (LPG) or diesel engine. 1 fig.

  6. Advanced Software Ground Station and UAV Development for NLoS Control Using Mobile Communications

    Directory of Open Access Journals (Sweden)

    Amr AbdElHamid

    2015-01-01

    Full Text Available Over the last decades, Unmanned Aerial Systems (UASs have gained much attention due to their various applications in different sections. However, their communication range is limited to utilized communication equipment. Therefore, utilization of GSM channels opens a new prospect towards long distance UAV missions and mobile command and control centers. This paper demonstrates new design and development of a small-scale UAV and a Ground Control Station (GCS using GSM bidirectional communications for Non-Line of Sight (NLoS long range control. GCSs are considered the front end node in UAV guidance process. Therefore, the proposed GCS employs a two-layer framework to consider all ground pilot requirements. Moreover, a new exploitation of global weather forecast data is added to the GCS. On the other hand, the proposed airborne system utilizes a new integration of different Commercial off-the-Shelf (COTS components and excludes short range receivers. The ground and flight tests show that stable bidirectional GSM communication is established, reliable hardware integration is accomplished, real time performance is achieved, GCS functional fidelity is obtained, and low cost is maintained. Finally, some qualitative aspects of the proposed platform are presented to address the detailed features.

  7. Californium-252 Program Equipment Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Chattin, Fred Rhea [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Kenton [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ezold, Julie G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    To successfully continue the 252Cf production and meet the needs of the customers, a comprehensive evaluation of the Building 7920 processing equipment was requested to identify equipment critical to the operational continuity of the program.

  8. After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-load Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Margaret J.; Busch, John F.

    2004-01-22

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of ''miscellaneous'' plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from twelve commercial buildings in California, Georgia, and Pennsylvania: two health care buildings, two large offices (> 500 employees each), three medium offices (50-500 employees), four education buildings, and one ''small office'' that is actually an aggregate of five small businesses. Two buildings are in the San Francisco Bay area of California, five are in

  9. AVM branch vibration test equipment

    International Nuclear Information System (INIS)

    Anne, J.P.

    1995-01-01

    An inventory of the test equipment of the AVM Branch ''Acoustic and Vibratory Mechanics Analysis Methods'' group has been undertaken. The purpose of this inventory is to enable better acquaintance with the technical characteristics of the equipment, providing an accurate definition of their functionalities, ad to inform potential users of the possibilities and equipment available in this field. The report first summarizes the various experimental surveys conduced. Then, using the AVM equipment database to draw up an exhaustive list of available equipment, it provides a full-scope picture of the vibration measurement systems (sensors, conditioners and exciters) and data processing resources commonly used on industrial sites and in laboratories. A definition is also given of a mobile test unit, called 'shelter', and a test bench used for the testing and performance rating of the experimental analysis methods developed by the group. The report concludes with a description of two fixed installations: - the calibration bench ensuring the requisite quality level for the vibration measurement systems ; - the training bench, whereby know-how acquired in the field in the field of measurement and experimental analysis processes is made available to others. (author). 27 refs., 15 figs., 2 appends

  10. Critical review of the equipment hatch of a large dry steel containment. The DEFENDER IMPROVEMENT

    International Nuclear Information System (INIS)

    Mantega, F.; Penno, E.; Vanini, P.

    1994-01-01

    Performances of the Containment System under Severe Accident conditions depend on a number of different features and components. The equipment hatch may be considered a critical component because it is a potential main contributor to the total Containment leak rate during a Severe accident and a potential (depending on the design) direct leak path between the containment atmosphere and the environment. The analytical study performed to anticipate the response of the equipment hatch of a large dry steel containment under Severe Accident condition has pointed out some questions of concern. The possible leak tightness failure mechanism are related to: the gaskets elastic characteristics degradation due to thermal and radiological aging; the deformation of the hatch sleeve induced by the containment wall; and the differential expansion between gasket material and steel. Beside, the equipment hatch may be considered a single barrier and although it is equipped with two gaskets, it is not difficult to demonstrate that a backup function cannot be assigned to the external gasket. For these reason it seems to be necessary to realize a wider application of the 'Defence in Depth' criteria in the design of this component. The DEFENDER (DEFENce in Depth Equipment hatch Requalification) might be a solution to increase the margin of safety of the equipment hatch under the Severe Accident condition. (author)

  11. Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Rifle, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase 1) and the Ground Water Project (Phase 2). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment

  12. Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Rifle, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase 1) and the Ground Water Project (Phase 2). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment.

  13. Age of ground water and the origin of its salinity in the Leba region

    International Nuclear Information System (INIS)

    Kwaterkiewicz, A.; Sadurski, A.; Zuber, A.

    1999-01-01

    Intensive exploitation of ground waters in the Leba region caused a strong increase of salinity, which on the basis of hydrochemistry, was supposed to result from the intrusion of the Baltic Sea water. Environmental isotope data revealed that water in the tertiary sediments is of glacial origin and its salinity is related to the admixture of ascending older waters. (author)

  14. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive

  15. Plant-wide integrated equipment monitoring and analysis system

    International Nuclear Information System (INIS)

    Morimoto, C.N.; Hunter, T.A.; Chiang, S.C.

    2004-01-01

    A nuclear power plant equipment monitoring system monitors plant equipment and reports deteriorating equipment conditions. The more advanced equipment monitoring systems can also provide information for understanding the symptoms and diagnosing the root cause of a problem. Maximizing the equipment availability and minimizing or eliminating consequential damages are the ultimate goals of equipment monitoring systems. GE Integrated Equipment Monitoring System (GEIEMS) is designed as an integrated intelligent monitoring and analysis system for plant-wide application for BWR plants. This approach reduces system maintenance efforts and equipment monitoring costs and provides information for integrated planning. This paper describes GEIEMS and how the current system is being upgraded to meet General Electric's vision for plant-wide decision support. (author)

  16. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  17. Charging equipment. Ladegeraet

    Energy Technology Data Exchange (ETDEWEB)

    Neumann, E

    1981-09-17

    The invention refers to a charging equipment, particularly on board charging equipment for charging traction batteries of an electric vehicle from the AC mains supply, consisting of a DC converter, which contains a controlled power transistor, a switching off unloading circuit and a power transmitter, where the secondary winding is connected in series with a rectifier diode, and a smoothing capacitor is connected in parallel with this series circuit. A converter module is provided, which consists of two DC voltage converters, whose power transistors are controlled by a control circuit in opposition with a phase displacement of 180/sup 0/.

  18. Population dynamics of Strongylocentrotus droebachiensis in kelpforests and barren grounds in Norway

    DEFF Research Database (Denmark)

    Fagerli, Camilla W.; Gran Stadniczeñko, Sandra; Pedersen, Morten Foldager

    2015-01-01

    A northward trend of declining abundance of sea urchins (Strongylocentrotus droebachiensis) and increasing kelp recovery along the coast of Norway has provided an opportunity to explore whether the decline of sea urchins can be explained by systematic variations in demographic or fitness-related ......A northward trend of declining abundance of sea urchins (Strongylocentrotus droebachiensis) and increasing kelp recovery along the coast of Norway has provided an opportunity to explore whether the decline of sea urchins can be explained by systematic variations in demographic or fitness......-related traits. The population density of sea urchins in mid-Norway (65°70′N) close to the boundary between barren grounds and recently recovered kelp forests was only 26 % of that on barren grounds in northern Norway (70°70′N). Populations were dominated by young (2–4 years) individuals and age-specific numbers...... decreased nearly exponentially with age. The variation in most demographic variables was high among replicate sampling sites and test size. Mean age and growth rates did not differ consistently among sites in mid- and northern Norway nor between barren ground and kelp sites. In contrast, mortality rates...

  19. 7 CFR 58.229 - Filler and packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Filler and packaging equipment. 58.229 Section 58.229....229 Filler and packaging equipment. All filling and packaging equipment shall be of sanitary... equipment should comply with the 3-A Sanitary Standards for equipment for Packaging Dry Milk and Dry Milk...

  20. Database Dictionary for Ethiopian National Ground-Water DAtabase (ENGDA) Data Fields

    Science.gov (United States)

    Kuniansky, Eve L.; Litke, David W.; Tucci, Patrick

    2007-01-01

    Introduction This document describes the data fields that are used for both field forms and the Ethiopian National Ground-water Database (ENGDA) tables associated with information stored about production wells, springs, test holes, test wells, and water level or water-quality observation wells. Several different words are used in this database dictionary and in the ENGDA database to describe a narrow shaft constructed in the ground. The most general term is borehole, which is applicable to any type of hole. A well is a borehole specifically constructed to extract water from the ground; however, for this data dictionary and for the ENGDA database, the words well and borehole are used interchangeably. A production well is defined as any well used for water supply and includes hand-dug wells, small-diameter bored wells equipped with hand pumps, or large-diameter bored wells equipped with large-capacity motorized pumps. Test holes are borings made to collect information about the subsurface with continuous core or non-continuous core and/or where geophysical logs are collected. Test holes are not converted into wells. A test well is a well constructed for hydraulic testing of an aquifer in order to plan a larger ground-water production system. A water-level or water-quality observation well is a well that is used to collect information about an aquifer and not used for water supply. A spring is any naturally flowing, local, ground-water discharge site. The database dictionary is designed to help define all fields on both field data collection forms (provided in attachment 2 of this report) and for the ENGDA software screen entry forms (described in Litke, 2007). The data entered into each screen entry field are stored in relational database tables within the computer database. The organization of the database dictionary is designed based on field data collection and the field forms, because this is what the majority of people will use. After each field, however, the