WorldWideScience

Sample records for ground delay programs

  1. Data Mining for Understanding and Impriving Decision-Making Affecting Ground Delay Programs

    Science.gov (United States)

    Kulkarni, Deepak; Wang, Yao Xun; Sridhar, Banavar

    2013-01-01

    The continuous growth in the demand for air transportation results in an imbalance between airspace capacity and traffic demand. The airspace capacity of a region depends on the ability of the system to maintain safe separation between aircraft in the region. In addition to growing demand, the airspace capacity is severely limited by convective weather. During such conditions, traffic managers at the FAA's Air Traffic Control System Command Center (ATCSCC) and dispatchers at various Airlines' Operations Center (AOC) collaborate to mitigate the demand-capacity imbalance caused by weather. The end result is the implementation of a set of Traffic Flow Management (TFM) initiatives such as ground delay programs, reroute advisories, flow metering, and ground stops. Data Mining is the automated process of analyzing large sets of data and then extracting patterns in the data. Data mining tools are capable of predicting behaviors and future trends, allowing an organization to benefit from past experience in making knowledge-driven decisions. The work reported in this paper is focused on ground delay programs. Data mining algorithms have the potential to develop associations between weather patterns and the corresponding ground delay program responses. If successful, they can be used to improve and standardize TFM decision resulting in better predictability of traffic flows on days with reliable weather forecasts. The approach here seeks to develop a set of data mining and machine learning models and apply them to historical archives of weather observations and forecasts and TFM initiatives to determine the extent to which the theory can predict and explain the observed traffic flow behaviors.

  2. Predictive Models of Duration of Ground Delay Programs in New York Area Airports

    Science.gov (United States)

    Kulkarni, Deepak

    2011-01-01

    Initially planned GDP duration often turns out to be an underestimate or an overestimate of the actual GDP duration. This, in turn, results in avoidable airborne or ground delays in the system. Therefore, better models of actual duration have the potential of reducing delays in the system. The overall objective of this study is to develop such models based on logs of GDPs. In a previous report, we described descriptive models of Ground Delay Programs. These models were defined in terms of initial planned duration and in terms of categorical variables. These descriptive models are good at characterizing the historical errors in planned GDP durations. This paper focuses on developing predictive models of GDP duration. Traffic Management Initiatives (TMI) are logged by Air Traffic Control facilities with The National Traffic Management Log (NTML) which is a single system for automated recoding, coordination, and distribution of relevant information about TMIs throughout the National Airspace System. (Brickman, 2004 Yuditsky, 2007) We use 2008-2009 GDP data from the NTML database for the study reported in this paper. NTML information about a GDP includes the initial specification, possibly one or more revisions, and the cancellation. In the next section, we describe general characteristics of Ground Delay Programs. In the third section, we develop models of actual duration. In the fourth section, we compare predictive performance of these models. The final section is a conclusion.

  3. Data Mining for Understanding and Improving Decision-making Affecting Ground Delay Programs

    Science.gov (United States)

    Kulkarni, Deepak; Wang, Yao; Sridhar, Banavar

    2013-01-01

    The continuous growth in the demand for air transportation results in an imbalance between airspace capacity and traffic demand. The airspace capacity of a region depends on the ability of the system to maintain safe separation between aircraft in the region. In addition to growing demand, the airspace capacity is severely limited by convective weather. During such conditions, traffic managers at the FAA's Air Traffic Control System Command Center (ATCSCC) and dispatchers at various Airlines' Operations Center (AOC) collaborate to mitigate the demand-capacity imbalance caused by weather. The end result is the implementation of a set of Traffic Flow Management (TFM) initiatives such as ground delay programs, reroute advisories, flow metering, and ground stops. Data Mining is the automated process of analyzing large sets of data and then extracting patterns in the data. Data mining tools are capable of predicting behaviors and future trends, allowing an organization to benefit from past experience in making knowledge-driven decisions.

  4. Figure/ground segregation from temporal delay is best at high spatial frequencies.

    Science.gov (United States)

    Kojima, H

    1998-12-01

    Two experiments investigated the role of spatial frequency in performance of a figure/ground segregation task based on temporal cues. Figure orientation was much easier to judge when figure and ground portions of the target were defined exclusively by random texture composed entirely of high spatial frequencies. When target components were defined by low spatial frequencies only, the task was nearly impossible except with long temporal delay between figure and ground. These results are inconsistent with the hypothesis that M-cell activity is primarily responsible for figure/ground segregation from temporal delay. Instead, these results point to a distinction between temporal integration and temporal differentiation. Additionally, the present results can be related to recent work on the binding of spatial features over time.

  5. Figure/ground segregation from temporal delay is best at high spatial frequencies

    OpenAIRE

    Kojima, Haruyuki

    1998-01-01

    Two experiments investigated the role of spatial frequency in performance of a figure/ground segregation task based on temporal cues. Figure orientation was much easier to judge when figure and ground portions of the target were defined exclusively by random texture composed entirely of high spatial frequencies. When target components were defined by low spatial frequencies only, the task was nearly impossible except with long temporal delay between figure and ground. These results are incons...

  6. Ground-Water Protection and Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Dresel, P.E.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the ground-water protection and monitoring program strategy for the Hanford Site in 1994. Two of the key elements of this strategy are to (1) protect the unconfined aquifer from further contamination, and (2) conduct a monitoring program to provide early warning when contamination of ground water does occur. The monitoring program at Hanford is designed to document the distribution and movement of existing ground-water contamination and provides a historical baseline for evaluating current and future risk from exposure to the contamination and for deciding on remedial action options.

  7. Ground-Water Protection and Monitoring Program

    International Nuclear Information System (INIS)

    Dresel, P.E.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the ground-water protection and monitoring program strategy for the Hanford Site in 1994. Two of the key elements of this strategy are to (1) protect the unconfined aquifer from further contamination, and (2) conduct a monitoring program to provide early warning when contamination of ground water does occur. The monitoring program at Hanford is designed to document the distribution and movement of existing ground-water contamination and provides a historical baseline for evaluating current and future risk from exposure to the contamination and for deciding on remedial action options

  8. Proving termination of logic programs with delay declarations

    NARCIS (Netherlands)

    E. Marchiori; F. Teusink (Frank)

    1996-01-01

    textabstractIn this paper we propose a method for proving termination of logic programs with delay declarations. The method is based on the notion of recurrent logic program, which is used to prove programs terminating wrt an arbitrary selection rule. Most importantly, we use the notion of bound

  9. Delayed visual maturation in infants: a disorder of figure-ground separation?

    Science.gov (United States)

    Harris, C M; Kriss, A; Shawkat, F; Taylor, D; Russell-Eggitt, I

    1996-01-01

    Delayed visual maturation (DVM) is characterised by visual unresponsiveness in early infancy, which subsequently improves spontaneously to normal levels. We studied the optokinetic response and recorded pattern reversal VEPs in six infants with DVM (aged 2-4 months) when they were at the stage of complete visual unresponsiveness. Although no saccades or visual tracking with the eyes or head could be elicited to visual objects, a normal full-field rapid buildup OKN response occurred when viewing biocularly or during monocular stimulation in the temporo-nasal direction of the viewing eye. Almost no monocular OKN could be elicited in the naso-temporal direction, which was significantly poorer than normal age-matched infants. No OKN quick phases were missed, and there were no other signs of "ocular motor apraxia." VEPs were normal in amplitude and latency for age. It appears, therefore, that infants with DVM are delayed in orienting to local regions of the visual field, but can respond to full-field motion. The presence of normal OKN quick-phases and slow-phases suggests normal brain stem function, and the presence of normal pattern VEPs suggests a normal retino-geniculo-striate pathway. These oculomotor and electrophysiological findings suggest delayed development of extra-striate cortical structures, possibly involving either an abnormality in figure-ground segregation or in attentional pathways.

  10. Ground Tilt Time Delays between Kilauea Volcano's Summit and East Rift Zone Caused by Magma Reservoir Buffering

    Science.gov (United States)

    Haney, M. M.; Patrick, M. R.; Anderson, K. R.

    2016-12-01

    A cyclic pattern of ground deformation, called a deflation-inflation (DI) cycle, is commonly observed at Kilauea Volcano, Hawai`i. These cycles are an important part of Kilauea's eruptive activity because they directly influence the level of the summit lava lake as well as the effusion rate (and resulting lava flow hazard) at the East Rift Zone eruption site at Pu`u `O`o. DI events normally span several days, and are measured both at the summit and at Pu`u `O`o cone (20 km distance). Signals appear first at the summit and are then observed at Pu`u `O`o after an apparent delay of between 0.5 and 10 hours, which has been previously interpreted as reflecting magma transport time. We propose an alternate explanation, in which the apparent delay is an artifact of buffering by the small magma reservoir thought to exist at Pu`u `O`o. Simple Poiseuille flow modeling demonstrates that this apparent delay can be reproduced by the changing balance of inflow (from the summit) and outflow (to surface lava flows) at the Pu`u `O`o magma reservoir. The apparent delay is sensitive to the geometry of the conduit leaving Pu`u `O`o, feeding surface lava flows. We demonstrate how the reservoir buffering is quantitatively equivalent to a causal low-pass filter, which explains both the apparent delay as well as the smoothed, skewed nature of the signal at Pu`u `O`o relative to the summit. By comparing summit and Pu`u `O`o ground tilt signals over an extended time period, it may be possible to constrain the changing geometry of the shallow magmatic system through time.

  11. Avoidant conversations about death by clinicians cause delays in reporting of neutropenic sepsis: Grounded theory study.

    Science.gov (United States)

    Oakley, Catherine; Taylor, Cath; Ream, Emma; Metcalfe, Alison

    2017-10-01

    Evidence suggests that patients delay reporting symptoms of neutropenic sepsis (NS) despite the risk to their life. This study aimed to elicit factors that contribute to delayed patient reporting of NS symptoms. A constructivist grounded theory study used observations of chemotherapy consultations (13 h) and 31 in-depth interviews to explore beliefs, experiences, and behaviors related to NS. Participants included women with breast cancer, their carers (partners, family, or friends), and clinicians. An explanation for patient delays was developed through theoretical sampling of participants to explore emerging areas of interest and through constant comparison of data and their coding. This entailed iterative and concurrent data collection and analysis. Data were collected until saturation. All patients who developed NS-type symptoms delayed presenting to hospital (2.5 h-8 days), sometimes repeatedly. Moderators of delay included metastatic disease, bereavement, fatalism, religious beliefs, and quality of relationships with clinicians. There was an interplay of behaviors between clinicians, patients, and carers where they subconsciously conspired to underplay the seriousness and possibility of NS occurring. Findings have implications for health risk communication and development of holistic service models. Copyright © 2016 John Wiley & Sons, Ltd.

  12. History of ground motion programs at the Nevada Test Site

    International Nuclear Information System (INIS)

    Banister, J.R.

    1984-01-01

    Some measurements were made in the atmospheric testing era, but the study of ground motion from nuclear tests became of wider interest after the instigation of underground testing. The ground motion generated by underground nuclear test has been investigated for a number of reasons including understanding basic phenomena, operational and safety concerns, yield determination, stimulation of earthquake concerns, and developing methods to aid in treaty verifications. This history of ground motion programs will include discussing early studies, high yield programs, Peaceful Nuclear Explosions tests, and some more recent developments. 6 references, 10 figures

  13. ATFM airborne delays without extra fuel consumption in wind conditions

    OpenAIRE

    Delgado, L.; Prats, X.

    2012-01-01

    Air Traffic Flow Management (ATFM) regulations, such as ground holdings, are often canceled before their initially planned ending time. The ground delays impact on the cost of recovering part of the delay if the regulation is canceled, as aircraft are still at the origin airport. In previous publications, the authors have suggested a speed reduction strategy to split the assigned ATFM delay between ground delay and airborne delay. By flying at the the minimum speed that g...

  14. Whistler-mode signals: Group delay by cross correlation

    International Nuclear Information System (INIS)

    Thomson, N.R.

    1975-01-01

    Group travel times of 18.6 kHz whistler-mode signals from NLK, Seattle, to Wellington, New Zealand, are now being measured using the normal FSK transmissions. This is done using a mini-computer programmed to perform real-time cross correlations between two receivers: one receiver gets its signal from a whip aerial on which the ground wave (subionospheric mode) dominates, while the other gets its signal from a loop oriented for minimum ground wave. Group travel time can thus be measured continuously while there are whistler-mode signals present. Delays of 0.2--0.8 seconds have been found

  15. Broadband demonstrations of true-time delay using linear sideband chirped programming and optical coherent transients

    International Nuclear Information System (INIS)

    Reibel, R.R.; Barber, Z.W.; Fischer, J.A.; Tian, M.; Babbitt, W.R.

    2004-01-01

    Linear sideband chirped (LSC) programming is introduced as a means of configuring spatial-spectral holographic gratings for optical coherent transient processors. Similar to linear frequency chirped programming, LSC programming allows the use of broadband integrated electro-optic phase modulators to produce chirps instead of using elaborate broadband chirped lasers. This approach has several advantages including the ability to use a stabilized laser for the optical carrier as well as stable, reproducible chirped optical signals when the modulator is driven digitally. Using LSC programming, we experimentally demonstrate broadband true-time delay as a proof of principle for the optical control of phased array radars. Here both cw phase modulated and binary phase shift keyed probe signals are true-time delayed with bandwidths of 1 GHz and delay resolutions better than 60 ps

  16. A Mobile Early Stimulation Program to Support Children with Developmental Delays in Brazil.

    Science.gov (United States)

    Dias, Raquel da Luz; Silva, Kátia Cristina Correa Guimarães; Lima, Marcela Raquel de Oliveira; Alves, João Guilherme Bezerra; Abidi, Syed Sibte Raza

    2018-01-01

    Developmental delay is a deviation development from the normative milestones during the childhood and it may be caused by neurological disorders. Early stimulation is a standardized and simple technique to treat developmental delays in children (aged 0-3 years), allowing them to reach the best development possible and to mitigate neuropsychomotor sequelae. However, the outcomes of the treatment depending on the involvement of the family, to continue the activities at home on a daily basis. To empower and educate parents of children with neurodevelopmental delays to administer standardized early stimulation programs at home, we developed a mobile early stimulation program that provides timely and evidence-based clinical decision support to health professionals and a personalized guidance to parents about how to administer early stimulation to their child at home.

  17. Delay discounting, treatment motivation and treatment retention among substance-dependent individuals attending an in inpatient detoxification program

    NARCIS (Netherlands)

    Stevens, Laura; Verdejo-García, Antonio; Roeyers, Herbert; Goudriaan, Anna E.; Vanderplasschen, Wouter

    2015-01-01

    Recent studies consistently indicate high rates of delay discounting in drug users, which refers to a strong tendency to devaluate delayed rewards. Many addiction treatment programs however, place high demands on the ability to postpone immediate gratification. Therefore, these programs may be

  18. Finite Volume Based Computer Program for Ground Source Heat Pump System

    Energy Technology Data Exchange (ETDEWEB)

    Menart, James A. [Wright State University

    2013-02-22

    This report is a compilation of the work that has been done on the grant DE-EE0002805 entitled ?Finite Volume Based Computer Program for Ground Source Heat Pump Systems.? The goal of this project was to develop a detailed computer simulation tool for GSHP (ground source heat pump) heating and cooling systems. Two such tools were developed as part of this DOE (Department of Energy) grant; the first is a two-dimensional computer program called GEO2D and the second is a three-dimensional computer program called GEO3D. Both of these simulation tools provide an extensive array of results to the user. A unique aspect of both these simulation tools is the complete temperature profile information calculated and presented. Complete temperature profiles throughout the ground, casing, tube wall, and fluid are provided as a function of time. The fluid temperatures from and to the heat pump, as a function of time, are also provided. In addition to temperature information, detailed heat rate information at several locations as a function of time is determined. Heat rates between the heat pump and the building indoor environment, between the working fluid and the heat pump, and between the working fluid and the ground are computed. The heat rates between the ground and the working fluid are calculated as a function time and position along the ground loop. The heating and cooling loads of the building being fitted with a GSHP are determined with the computer program developed by DOE called ENERGYPLUS. Lastly COP (coefficient of performance) results as a function of time are provided. Both the two-dimensional and three-dimensional computer programs developed as part of this work are based upon a detailed finite volume solution of the energy equation for the ground and ground loop. Real heat pump characteristics are entered into the program and used to model the heat pump performance. Thus these computer tools simulate the coupled performance of the ground loop and the heat pump

  19. Ground-source heat pump case studies and utility programs

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.J.; Boyd, T.L.; Rogers, R.L.

    1995-04-01

    Ground-source heat pump systems are one of the promising new energy technologies that has shown rapid increase in usage over the past ten years in the United States. These systems offer substantial benefits to consumers and utilities in energy (kWh) and demand (kW) savings. The purpose of this study was to determine what existing monitored data was available mainly from electric utilities on heat pump performance, energy savings and demand reduction for residential, school and commercial building applications. In order to verify the performance, information was collected for 253 case studies from mainly utilities throughout the United States. The case studies were compiled into a database. The database was organized into general information, system information, ground system information, system performance, and additional information. Information was developed on the status of demand-side management of ground-source heat pump programs for about 60 electric utility and rural electric cooperatives on marketing, incentive programs, barriers to market penetration, number units installed in service area, and benefits.

  20. Smart-Grid Backbone Network Real-Time Delay Reduction via Integer Programming.

    Science.gov (United States)

    Pagadrai, Sasikanth; Yilmaz, Muhittin; Valluri, Pratyush

    2016-08-01

    This research investigates an optimal delay-based virtual topology design using integer linear programming (ILP), which is applied to the current backbone networks such as smart-grid real-time communication systems. A network traffic matrix is applied and the corresponding virtual topology problem is solved using the ILP formulations that include a network delay-dependent objective function and lightpath routing, wavelength assignment, wavelength continuity, flow routing, and traffic loss constraints. The proposed optimization approach provides an efficient deterministic integration of intelligent sensing and decision making, and network learning features for superior smart grid operations by adaptively responding the time-varying network traffic data as well as operational constraints to maintain optimal virtual topologies. A representative optical backbone network has been utilized to demonstrate the proposed optimization framework whose simulation results indicate that superior smart-grid network performance can be achieved using commercial networks and integer programming.

  1. Optimal Re-Routes and Ground Delays Using a Route-Based Aggregate Air Traffic Flow Model

    Science.gov (United States)

    Soler, Lluis

    The National Airspace System (NAS) is very complex and with a high level of uncertainty. For this reason, developing an automated conflict resolution tool at NAS level is presented as a big challenge. One way to address the problem is by using aggregate models, which can significantly reduce its dimension and complexity. Significant effort has been made to develop an air traffic aggregate model capable to effectively state and solve the problem. In this study, a Route-Based Aggregate Model is developed and tested. It consists in a modification of several existing models and overcomes some issues identified in previous aggregate models. It allows the implementation of Traffic Flow Management conventional controls, such as ground delay and rerouting. These control strategies can be used to avoid congestion conflicts based on sectors and airports capacity as well as regions affected by convective weather. The optimization problem is posed as a Linear Programming routine, which guarantees an optimal solution that minimizes the total accumulated delay required to avoid such capacity conflicts. The solutions can be directly translated into specific instructions at aircraft level, via modification of the times of departure and flight plans. The model is integrated with Future Air Traffic Management Concepts Evaluation Tool (FACET), a state of the art air traffic simulation tool, and uses its files as both input and output. This allows simulating in FACET the solution obtained from the aggregate domain. The approach is validated by applying it in three realistic scenarios at different scales. Results show that, for time horizons larger than 2 hours, the accuracy of the aggregate model is similar to other simulation tools. Also, the modified flight plans, the product of the disaggregated solution, reduce the number of capacity conflicts in the FACET simulation. Future research will study the robustness of these solutions and determine the most appropriate scenarios where to

  2. Purely temporal figure-ground segregation.

    Science.gov (United States)

    Kandil, F I; Fahle, M

    2001-05-01

    Visual figure-ground segregation is achieved by exploiting differences in features such as luminance, colour, motion or presentation time between a figure and its surround. Here we determine the shortest delay times required for figure-ground segregation based on purely temporal features. Previous studies usually employed stimulus onset asynchronies between figure- and ground-containing possible artefacts based on apparent motion cues or on luminance differences. Our stimuli systematically avoid these artefacts by constantly showing 20 x 20 'colons' that flip by 90 degrees around their midpoints at constant time intervals. Colons constituting the background flip in-phase whereas those constituting the target flip with a phase delay. We tested the impact of frequency modulation and phase reduction on target detection. Younger subjects performed well above chance even at temporal delays as short as 13 ms, whilst older subjects required up to three times longer delays in some conditions. Figure-ground segregation can rely on purely temporal delays down to around 10 ms even in the absence of luminance and motion artefacts, indicating a temporal precision of cortical information processing almost an order of magnitude lower than the one required for some models of feature binding in the visual cortex [e.g. Singer, W. (1999), Curr. Opin. Neurobiol., 9, 189-194]. Hence, in our experiment, observers are unable to use temporal stimulus features with the precision required for these models.

  3. Delay-Aware Program Codes Dissemination Scheme in Internet of Everything

    Directory of Open Access Journals (Sweden)

    Yixuan Xu

    2016-01-01

    Full Text Available Due to recent advancements in big data, connection technologies, and smart devices, our environment is transforming into an “Internet of Everything” (IoE environment. These smart devices can obtain new or special functions by reprogramming: upgrade their soft systems through receiving new version of program codes. However, bulk codes dissemination suffers from large delay, energy consumption, and number of retransmissions because of the unreliability of wireless links. In this paper, a delay-aware program dissemination (DAPD scheme is proposed to disseminate program codes with fast, reliable, and energy-efficient style. We observe that although total energy is limited in wireless sensor network, there exists residual energy in nodes deployed far from the base station. Therefore, DAPD scheme improves the performance of bulk codes dissemination through the following two aspects. (1 Due to the fact that a high transmitting power can significantly improve the quality of wireless links, transmitting power of sensors with more residual energy is enhanced to improve link quality. (2 Due to the fact that performance of correlated dissemination tends to degrade in a highly dynamic environment, link correlation is autonomously updated in DAPD during codes dissemination to maintain improvements brought by correlated dissemination. Theoretical analysis and experimental results show that, compared with previous work, DAPD scheme improves the dissemination performance in terms of completion time, transmission cost, and the efficiency of energy utilization.

  4. Development of a package program for estimating ground level concentrations of radioactive gases

    International Nuclear Information System (INIS)

    Nilkamhang, W.

    1986-01-01

    A package program for estimating ground level concentration of radioactive gas from elevate release was develop for use on IBM P C microcomputer. The main program, GAMMA PLUME NT10, is based on the well known VALLEY MODEL which is a Fortran computer code intended for mainframe computers. Other two options were added, namely, calculation of radioactive gas ground level concentration in Ci/m 3 and dose equivalent rate in mren/hr. In addition, a menu program and editor program were developed to render the program easier to use since the option could be readily selected and the input data could be easily modified as required through the keyboard. The accuracy and reliability of the program is almost identical to the mainframe. Ground level concentration of radioactive radon gas due to ore program processing in the nuclear chemistry laboratory of the Department of Nuclear Technology was estimated. In processing radioactive ore at a rate of 2 kg/day, about 35 p Ci/s of radioactive gas was released from a 14 m stack. When meteorological data of Don Muang (average for 5 years 1978-1982) were used maximum ground level concentration and the dose equivalent rate were found to be 0.00094 p Ci/m 3 and 5.0 x 10 -10 mrem/hr respectively. The processing time required for the above problem was about 7 minutes for any case of source on IBM P C which was acceptable for a computer of this class

  5. Informed Grounded Theory

    Science.gov (United States)

    Thornberg, Robert

    2012-01-01

    There is a widespread idea that in grounded theory (GT) research, the researcher has to delay the literature review until the end of the analysis to avoid contamination--a dictum that might turn educational researchers away from GT. Nevertheless, in this article the author (a) problematizes the dictum of delaying a literature review in classic…

  6. Recovery Act: Finite Volume Based Computer Program for Ground Source Heat Pump Systems

    Energy Technology Data Exchange (ETDEWEB)

    James A Menart, Professor

    2013-02-22

    This report is a compilation of the work that has been done on the grant DE-EE0002805 entitled Finite Volume Based Computer Program for Ground Source Heat Pump Systems. The goal of this project was to develop a detailed computer simulation tool for GSHP (ground source heat pump) heating and cooling systems. Two such tools were developed as part of this DOE (Department of Energy) grant; the first is a two-dimensional computer program called GEO2D and the second is a three-dimensional computer program called GEO3D. Both of these simulation tools provide an extensive array of results to the user. A unique aspect of both these simulation tools is the complete temperature profile information calculated and presented. Complete temperature profiles throughout the ground, casing, tube wall, and fluid are provided as a function of time. The fluid temperatures from and to the heat pump, as a function of time, are also provided. In addition to temperature information, detailed heat rate information at several locations as a function of time is determined. Heat rates between the heat pump and the building indoor environment, between the working fluid and the heat pump, and between the working fluid and the ground are computed. The heat rates between the ground and the working fluid are calculated as a function time and position along the ground loop. The heating and cooling loads of the building being fitted with a GSHP are determined with the computer program developed by DOE called ENERGYPLUS. Lastly COP (coefficient of performance) results as a function of time are provided. Both the two-dimensional and three-dimensional computer programs developed as part of this work are based upon a detailed finite volume solution of the energy equation for the ground and ground loop. Real heat pump characteristics are entered into the program and used to model the heat pump performance. Thus these computer tools simulate the coupled performance of the ground loop and the heat pump. The

  7. Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs

    Directory of Open Access Journals (Sweden)

    Jing-chun Feng

    2012-09-01

    Full Text Available According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably.

  8. Easy-to-use application programs for decay heat and delayed neutron calculations on personal computers

    Energy Technology Data Exchange (ETDEWEB)

    Oyamatsu, Kazuhiro [Nagoya Univ. (Japan)

    1998-03-01

    Application programs for personal computers are developed to calculate the decay heat power and delayed neutron activity from fission products. The main programs can be used in any computers from personal computers to main frames because their sources are written in Fortran. These programs have user friendly interfaces to be used easily not only for research activities but also for educational purposes. (author)

  9. Constellation Program Electrical Ground Support Equipment Research and Development

    Science.gov (United States)

    McCoy, Keegan S.

    2010-01-01

    At the Kennedy Space Center, I engaged in the research and development of electrical ground support equipment for NASA's Constellation Program. Timing characteristics playa crucial role in ground support communications. Latency and jitter are two problems that must be understood so that communications are timely and consistent within the Kennedy Ground Control System (KGCS). I conducted latency and jitter tests using Alien-Bradley programmable logic controllers (PLCs) so that these two intrinsic network properties can be reduced. Time stamping and clock synchronization also play significant roles in launch processing and operations. Using RSLogix 5000 project files and Wireshark network protocol analyzing software, I verified master/slave PLC Ethernet module clock synchronization, master/slave IEEE 1588 communications, and time stamping capabilities. All of the timing and synchronization test results are useful in assessing the current KGCS operational level and determining improvements for the future.

  10. Effect of a comprehensive health education program on pre-hospital delay intentions in high-risk stroke population and caregivers.

    Science.gov (United States)

    Yang, Li; Zhao, Qiuli; Zhu, Xuemei; Shen, Xiaoying; Zhu, Yulan; Yang, Liu; Gao, Wei; Li, Minghui

    2017-08-01

    Many factors influence pre-hospital delays in the event of stroke. This study aimed to develop and evaluate a comprehensive educational program for decreasing pre-hospital delays in high-risk stroke population. We enrolled 220 high-risk stroke population and caregivers from six urban communities in Harbin from May 2013 to May 2015, and randomly divided them into intervention and control groups. We implemented a comprehensive educational program (intervention group), comprising public lectures, instructional brochures, case videos, simulations, and role-playing from May 2013 to May 2015. We delivered conventional oral education in the control group. We compared stroke pre-hospital delay behavioral intention (SPDBI), pre-hospital stroke symptom coping test (PSSCT), and stroke pre-symptoms alert test (SPSAT) results between the groups before and 6, 12, and 18 months after health intervention. There were significant differences between before and after intervention (P educational program was significantly effective in decreasing SPDBI, improving knowledge, enhancing stroke pre-symptoms alert, and reducing the possibility of pre-hospital delays.

  11. Strength of figure-ground activity in monkey primary visual cortex predicts saccadic reaction time in a delayed detection task.

    Science.gov (United States)

    Supèr, Hans; Lamme, Victor A F

    2007-06-01

    When and where are decisions made? In the visual system a saccade, which is a fast shift of gaze toward a target in the visual scene, is the behavioral outcome of a decision. Current neurophysiological data and reaction time models show that saccadic reaction times are determined by a build-up of activity in motor-related structures, such as the frontal eye fields. These structures depend on the sensory evidence of the stimulus. Here we use a delayed figure-ground detection task to show that late modulated activity in the visual cortex (V1) predicts saccadic reaction time. This predictive activity is part of the process of figure-ground segregation and is specific for the saccade target location. These observations indicate that sensory signals are directly involved in the decision of when and where to look.

  12. ANALYSING SURFACE MOVEMENT DELAYS IN AN AIRPORT

    Directory of Open Access Journals (Sweden)

    Volodymyr Kharchenko

    2014-07-01

    Full Text Available Queuing effect can be in the different components of ground operations. Causes of surface – movement delays are long taxi – in and taxi – out operations during departure and arrival of aircraft. Surface movement delays in an airport are analyzed

  13. Dissolvable fluidic time delays for programming multi-step assays in instrument-free paper diagnostics.

    Science.gov (United States)

    Lutz, Barry; Liang, Tinny; Fu, Elain; Ramachandran, Sujatha; Kauffman, Peter; Yager, Paul

    2013-07-21

    Lateral flow tests (LFTs) are an ingenious format for rapid and easy-to-use diagnostics, but they are fundamentally limited to assay chemistries that can be reduced to a single chemical step. In contrast, most laboratory diagnostic assays rely on multiple timed steps carried out by a human or a machine. Here, we use dissolvable sugar applied to paper to create programmable flow delays and present a paper network topology that uses these time delays to program automated multi-step fluidic protocols. Solutions of sucrose at different concentrations (10-70% of saturation) were added to paper strips and dried to create fluidic time delays spanning minutes to nearly an hour. A simple folding card format employing sugar delays was shown to automate a four-step fluidic process initiated by a single user activation step (folding the card); this device was used to perform a signal-amplified sandwich immunoassay for a diagnostic biomarker for malaria. The cards are capable of automating multi-step assay protocols normally used in laboratories, but in a rapid, low-cost, and easy-to-use format.

  14. Applicability of a generic monitoring program for radioactive waste burial grounds at Oak Ridge National Laboratory and Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1978-07-01

    Six burial grounds were evaluated at Oak Ridge to determine which would be most suitable for testing the generic monitoring approach, and two were selected. Burial Ground 4 was chosen because it is known to be leaking radioactivity and a monitoring program is desirable to determine the source, pattern and extent of the leakage. Burial Ground 6 was chosen because the most complete radiologic and geologic data is available and modern burial practices have been utilized at this site. At the Idaho National Engineering Laboratory (INEL) only one burial ground exists, the Radioactive Waste Management Complex (RWMC). The data available on the burial grounds are insufficient for an adequate understanding of radionuclide migration patterns and accordingly, inadequate for the design of reliable monitoring programs. It was decided, therefore, that preliminary monitoring programs should be designed in order to obtain additional data for a later implementation of reliable monitoring programs. The monitoring programs designed for ORNL consist primarily of the installation of surface water monitoring stations, the surveillance of trench sump wells, a test boring program to study subsurface geologic conditions, a ground water sampling program and the installation of instrumentation, specifically infiltrometers and evaporation pans, to develop data on site water balances. The program designed for the INEL burial ground includes installation of trench sumps, a ground water monitoring program, test borings to further define subsurface geohydrologic conditions and the installation of instrumentation to develop data on the site water balance. The estimated costs of implementing the recommended programs are about $420,820 for monitoring Burial Grounds 4 and 6 at Oak Ridge and $382,060 for monitoring the RWMC at INEL. 12 figures

  15. Ground Robotic Hand Applications for the Space Program study (GRASP)

    Science.gov (United States)

    Grissom, William A.; Rafla, Nader I. (Editor)

    1992-01-01

    This document reports on a NASA-STDP effort to address research interests of the NASA Kennedy Space Center (KSC) through a study entitled, Ground Robotic-Hand Applications for the Space Program (GRASP). The primary objective of the GRASP study was to identify beneficial applications of specialized end-effectors and robotic hand devices for automating any ground operations which are performed at the Kennedy Space Center. Thus, operations for expendable vehicles, the Space Shuttle and its components, and all payloads were included in the study. Typical benefits of automating operations, or augmenting human operators performing physical tasks, include: reduced costs; enhanced safety and reliability; and reduced processing turnaround time.

  16. Rainfall Product Evaluation for the TRMM Ground Validation Program

    Science.gov (United States)

    Amitai, E.; Wolff, D. B.; Robinson, M.; Silberstein, D. S.; Marks, D. A.; Kulie, M. S.; Fisher, B.; Einaudi, Franco (Technical Monitor)

    2000-01-01

    Evaluation of the Tropical Rainfall Measuring Mission (TRMM) satellite observations is conducted through a comprehensive Ground Validation (GV) Program. Standardized instantaneous and monthly rainfall products are routinely generated using quality-controlled ground based radar data from four primary GV sites. As part of the TRMM GV program, effort is being made to evaluate these GV products and to determine the uncertainties of the rainfall estimates. The evaluation effort is based on comparison to rain gauge data. The variance between the gauge measurement and the true averaged rain amount within the radar pixel is a limiting factor in the evaluation process. While monthly estimates are relatively simple to evaluate, the evaluation of the instantaneous products are much more of a challenge. Scattegrams of point comparisons between radar and rain gauges are extremely noisy for several reasons (e.g. sample volume discrepancies, timing and navigation mismatches, variability of Z(sub e)-R relationships), and therefore useless for evaluating the estimates. Several alternative methods, such as the analysis of the distribution of rain volume by rain rate as derived from gauge intensities and from reflectivities above the gauge network will be presented. Alternative procedures to increase the accuracy of the estimates and to reduce their uncertainties also will be discussed.

  17. From the ground up: building a minimally invasive aortic valve surgery program

    OpenAIRE

    Nguyen, Tom C.; Lamelas, Joseph

    2015-01-01

    Minimally invasive aortic valve replacement (MIAVR) is associated with numerous advantages including improved patient satisfaction, cosmesis, decreased transfusion requirements, and cost-effectiveness. Despite these advantages, little information exists on how to build a MIAVR program from the ground up. The steps to build a MIAVR program include compiling a multi-disciplinary team composed of surgeons, cardiologists, anesthesiologists, perfusionists, operating room (OR) technicians, and nurs...

  18. Test Report Emission Test Program EPA Information Collection Request for Delayed Coking Units 736 Coker Unit

    Science.gov (United States)

    ARI Environmental, Inc. (ARI) was retained by Houston Refining LP (HRO) to conduct an emission test program at their refinery located in Houston, Texas. The testing was conducted on on the 736 Delayed Coking Unit (DCU) in response to EPA's ICR.

  19. Seismic Safety Program: Ground motion and structural response

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    In 1964, John A. Blume & Associates Research Division (Blume) began a broad-range structural response program to assist the Nevada Operations Office of the US Atomic Energy Commission (AEC) in ensuring the continued safe conduct of underground nuclear detonation testing at the Nevada Test Site (NTS) and elsewhere. Blume`s long experience in earthquake engineering provided a general basis for the program, but much more specialized knowledge was required for the AEC`s purposes. Over the next 24 years Blume conducted a major research program to provide essential understanding of the detailed nature of the response of structures to dynamic loads such as those imposed by seismic wave propagation. The program`s results have been embodied in a prediction technology which has served to provide reliable advanced knowledge of the probable effects of seismic ground motion on all kinds of structures, for use in earthquake engineering and in building codes as well as for the continuing needs of the US Department of Energy`s Nevada Operations Office (DOE/NV). This report is primarily an accounting of the Blume work, beginning with the setting in 1964 and the perception of the program needs as envisioned by Dr. John A. Blume. Subsequent chapters describe the structural response program in detail and the structural prediction procedures which resulted; the intensive data acquisition program which, as is discussed at some length, relied heavily on the contributions of other consultant-contractors in the DOE/NV Seismic Safety Support Program; laboratory and field studies to provide data on building elements and structures subjected to dynamic loads from sources ranging from testing machines to earthquakes; structural response activities undertaken for testing at the NTS and for off-NTS underground nuclear detonations; and concluding with an account of corollary studies including effects of natural forces and of related studies on building response.

  20. Kennedy Space Center: Constellation Program Electrical Ground Support Equipment Research and Development

    Science.gov (United States)

    McCoy, Keegan

    2010-01-01

    The Kennedy Space Center (KSC) is NASA's spaceport, launching rockets into space and leading important human spaceflight research. This spring semester, I worked at KSC on Constellation Program electrical ground support equipment through NASA's Undergraduate Student Research Program (USRP). This report includes a discussion of NASA, KSC, and my individual research project. An analysis of Penn State's preparation of me for an internship and my overall impressions of the Penn State and NASA internship experience conclude the report.

  1. Periodic Solutions of a System of Delay Differential Equations for a Small Delay

    Directory of Open Access Journals (Sweden)

    Adu A.M. Wasike

    2002-06-01

    Full Text Available We prove the existence of an asymptotically stable periodic solution of a system of delay differential equations with a small time delay t > 0. To achieve this, we transform the system of equations into a system of perturbed ordinary differential equations and then use perturbation results to show the existence of an asymptotically stable periodic solution. This approach is contingent on the fact that the system of equations with t = 0 has a stable limit cycle. We also provide a comparative study of the solutions of the original system and the perturbed system.  This comparison lays the ground for proving the existence of periodic solutions of the original system by Schauder's fixed point theorem.

  2. Medicaid program; premiums and cost sharing. Final rule; delay of effective data and reopening of comment period.

    Science.gov (United States)

    2009-01-27

    In accordance with the memorandum of January 20, 2009, from the Assistant to the President and Chief of Staff, entitled "Regulatory Review Plan," this action temporarily delays for 60 days the effective date of the final rule entitled "Medicaid Program; Premiums and Cost Sharing" (73 FR 71828). The temporary 60-day delay in effective date is necessary to give Department officials the opportunity for further review and consideration of new regulations. In addition, this action reopens the comment period on the policies set out in the November 25, 2008 final rule.

  3. Drug Pricing Program Ceiling Price and Manufacturer Civil Monetary Penalties Regulation. Final rule; further delay of effective date.

    Science.gov (United States)

    2017-09-29

    The Health Resources and Services Administration (HRSA) administers section 340B of the Public Health Service Act (PHSA), known as the "340B Drug Pricing Program" or the "340B Program." HRSA published a final rule on January 5, 2017, that set forth the calculation of the ceiling price and application of civil monetary penalties. The final rule applied to all drug manufacturers that are required to make their drugs available to covered entities under the 340B Program. On August 21, 2017, HHS solicited comments on further delaying the effective date of the January 5, 2017, final rule to July 1, 2018 (82 FR 39553). HHS proposed this action to allow a more deliberate process of considering alternative and supplemental regulatory provisions and to allow for sufficient time for additional rulemaking. After consideration of the comments received on the proposed rule, HHS is delaying the effective date of the January 5, 2017, final rule, to July 1, 2018.

  4. Tuberculosis related stigma and its effect on the delay for sputum examination under the Revised National Tuberculosis Control Program in India.

    Science.gov (United States)

    Chakrabartty, Arupkumar; Basu, Pampa; Ali, Kazi Monjur; Sarkar, Aditi Kishore; Ghosh, Debidas

    2018-04-01

    One major barrier to achieve goal of tuberculosis (TB) control program globally, is the stigma attached to the disease. Perceived stigma can delay sputum test in time. Delay will lead to spread of infection in the community. There is no scientific information available in India exactly looking into the association between delay in sputum examination and stigma. We conducted a study in rural West Bengal among persons with cough for 2 weeks or more to assess their level of stigma, its influence on delay for sputum test and identify factors those shape the level of stigma. A community based cross sectional survey was conducted from February to June 2015 in West Bengal, India. We interviewed 135 persons of 15-60 years. Data were collected using a pretested structured questionnaire. Chi-square and logistic regression analysis were done using SPSS 23.0 statistical software. Among the 'lower stigma' group (score 4-24), 'delay' (14-25 days) is found among 46.2% respondents and 'much delay' (26-120 days) among 53.8%. Among the 'higher stigma' (score 25-36) group, 'delay' is found among 20.5% respondents and 'much delay' among 79.5%. Persons with lower stigma are 0.17 times likely to delay than persons with higher stigma [adjusted odds ratio (AOR): 0.17 (0.044-0.668), p=0.011)]. Important influencers of stigma are caste [AOR: 5.90 (1.66-20.90), p=0.006], number of family members [AOR: 3.46 (1.08-11.06), p=0.009] and residence in urban or rural [AOR: 3.97 (1.03-15.27), p=0.045]. Revised National Tuberculosis Control Program in India should de-stigmatize the community giving priorities to lower castes, big families and rural areas. Copyright © 2017 Tuberculosis Association of India. Published by Elsevier B.V. All rights reserved.

  5. Delaying Mobility Disability in People With Parkinson Disease Using a Sensorimotor Agility Exercise Program

    OpenAIRE

    King, Laurie A; Horak, Fay B

    2009-01-01

    This article introduces a new framework for therapists to develop an exercise program to delay mobility disability in people with Parkinson disease (PD). Mobility, or the ability to efficiently navigate and function in a variety of environments, requires balance, agility, and flexibility, all of which are affected by PD. This article summarizes recent research identifying how constraints on mobility specific to PD, such as rigidity, bradykinesia, freezing, poor sensory integration, inflexible...

  6. 340B Drug Pricing Program Ceiling Price and Manufacturer Civil Monetary Penalties Regulation. Final rule; further delay of effective date.

    Science.gov (United States)

    2017-05-19

    The Health Resources and Services Administration (HRSA) administers section 340B of the Public Health Service Act (PHSA), referred to as the "340B Drug Pricing Program" or the "340B Program." HRSA published a final rule on January 5, 2017, that set forth the calculation of the ceiling price and application of civil monetary penalties. The final rule applied to all drug manufacturers that are required to make their drugs available to covered entities under the 340B Program. In accordance with a January 20, 2017, memorandum from the Assistant to the President and Chief of Staff, entitled "Regulatory Freeze Pending Review," HRSA issued an interim final rule that delayed the effective date of the final rule published in the Federal Register (82 FR 1210, (January 5, 2017)) to May 22, 2017. HHS invited commenters to provide their views on whether a longer delay of the effective date to October 1, 2017, would be more appropriate. After consideration of the comments received on the interim final rule, HHS is delaying the effective date of the January 5, 2017 final rule, to October 1, 2017.

  7. Ground test program for a full-size solar dynamic heat receiver

    Science.gov (United States)

    Sedgwick, L. M.; Kaufmann, K. J.; Mclallin, K. L.; Kerslake, T. W.

    1991-01-01

    Test hardware, facilities, and procedures were developed to conduct ground testing of a full-size, solar dynamic heat receiver in a partially simulated, low earth orbit environment. The heat receiver was designed to supply 102 kW of thermal energy to a helium and xenon gas mixture continuously over a 94 minute orbit, including up to 36 minutes of eclipse. The purpose of the test program was to quantify the receiver thermodynamic performance, its operating temperatures, and thermal response to changes in environmental and power module interface boundary conditions. The heat receiver was tested in a vacuum chamber using liquid nitrogen cold shrouds and an aperture cold plate. Special test equipment was designed to provide the required ranges in interface boundary conditions that typify those expected or required for operation as part of the solar dynamic power module on the Space Station Freedom. The support hardware includes an infrared quartz lamp heater with 30 independently controllable zones and a closed-Brayton cycle engine simulator to circulate and condition the helium-xenon gas mixture. The test article, test support hardware, facilities, and instrumentation developed to conduct the ground test program are all described.

  8. Delaying mobility disability in people with Parkinson disease using a sensorimotor agility exercise program.

    Science.gov (United States)

    King, Laurie A; Horak, Fay B

    2009-04-01

    This article introduces a new framework for therapists to develop an exercise program to delay mobility disability in people with Parkinson disease (PD). Mobility, or the ability to efficiently navigate and function in a variety of environments, requires balance, agility, and flexibility, all of which are affected by PD. This article summarizes recent research identifying how constraints on mobility specific to PD, such as rigidity, bradykinesia, freezing, poor sensory integration, inflexible program selection, and impaired cognitive processing, limit mobility in people with PD. Based on these constraints, a conceptual framework for exercises to maintain and improve mobility is presented. An example of a constraint-focused agility exercise program, incorporating movement principles from tai chi, kayaking, boxing, lunges, agility training, and Pilates exercises, is presented. This new constraint-focused agility exercise program is based on a strong scientific framework and includes progressive levels of sensorimotor, resistance, and coordination challenges that can be customized for each patient while maintaining fidelity. Principles for improving mobility presented here can be incorporated into an ongoing or long-term exercise program for people with PD.

  9. Quad nanosecond delay module

    International Nuclear Information System (INIS)

    McDonald, R.J.; Hunter, J.B.; Wozniak, G.J.

    1986-04-01

    Four nanosecond (ns) delay units have been designed to fit in a single-width NIM module. This module is particularly suited for use in conjunction with quad constant fraction timing discriminators (CFTDs) since it has four delay units that can be placed adjacent to the four units of the CFTD. A series of different length cables connected via DIP toggle switches provide delays of 0.60 ns in 4 ns increments. Thus, the CFTD delay can be optimized for pulses of different rise times from approx.10-100 ns. Design work for the PC board and silkscreening of the front panel were done with the MacDraw program on the Apple Mackintosh computer and printed with the Lasewriter printer. 6 refs

  10. User Guide and Documentation for Five MODFLOW Ground-Water Modeling Utility Programs

    Science.gov (United States)

    Banta, Edward R.; Paschke, Suzanne S.; Litke, David W.

    2008-01-01

    This report documents five utility programs designed for use in conjunction with ground-water flow models developed with the U.S. Geological Survey's MODFLOW ground-water modeling program. One program extracts calculated flow values from one model for use as input to another model. The other four programs extract model input or output arrays from one model and make them available in a form that can be used to generate an ArcGIS raster data set. The resulting raster data sets may be useful for visual display of the data or for further geographic data processing. The utility program GRID2GRIDFLOW reads a MODFLOW binary output file of cell-by-cell flow terms for one (source) model grid and converts the flow values to input flow values for a different (target) model grid. The spatial and temporal discretization of the two models may differ. The four other utilities extract selected 2-dimensional data arrays in MODFLOW input and output files and write them to text files that can be imported into an ArcGIS geographic information system raster format. These four utilities require that the model cells be square and aligned with the projected coordinate system in which the model grid is defined. The four raster-conversion utilities are * CBC2RASTER, which extracts selected stress-package flow data from a MODFLOW binary output file of cell-by-cell flows; * DIS2RASTER, which extracts cell-elevation data from a MODFLOW Discretization file; * MFBIN2RASTER, which extracts array data from a MODFLOW binary output file of head or drawdown; and * MULT2RASTER, which extracts array data from a MODFLOW Multiplier file.

  11. TFTR grounding scheme and ground-monitor system

    International Nuclear Information System (INIS)

    Viola, M.

    1983-01-01

    The Tokamak Fusion Test Reactor (TFTR) grounding system utilizes a single-point ground. It is located directly under the machine, at the basement floor level, and is tied to the building perimeter ground. Wired to this single-point ground, via individual 500 MCM insulated cables, are: the vacuum vessel; four toroidal field coil cases/inner support structure quadrants; umbrella structure halves; the substructure ring girder; radial beams and columns; and the diagnostic systems. Prior to the first machine operation, a ground-loop removal program was initiated. It required insulation of all hangers and supports (within a 35-foot radius of the center of the machine) of the various piping, conduits, cable trays, and ventilation systems. A special ground-monitor system was designed and installed. It actively monitors each of the individual machine grounds to insure that there are no inadvertent ground loops within the machine structure or its ground and that the machine grounds are intact prior to each pulse. The TFTR grounding system has proven to be a very manageable system and one that is easy to maintain

  12. Identifying Barriers in Implementing Outcomes-Based Assessment Program Review: A Grounded Theory Analysis

    Science.gov (United States)

    Bresciani, Marilee J.

    2011-01-01

    The purpose of this grounded theory study was to identify the typical barriers encountered by faculty and administrators when implementing outcomes-based assessment program review. An analysis of interviews with faculty and administrators at nine institutions revealed a theory that faculty and administrators' promotion, tenure (if applicable),…

  13. Development of a PC-based ground support system for a small satellite instrument

    Science.gov (United States)

    Deschambault, Robert L.; Gregory, Philip R.; Spenler, Stephen; Whalen, Brian A.

    1993-11-01

    The importance of effective ground support for the remote control and data retrieval of a satellite instrument cannot be understated. Problems with ground support may include the need to base personnel at a ground tracking station for extended periods, and the delay between the instrument observation and the processing of the data by the science team. Flexible solutions to such problems in the case of small satellite systems are provided by using low-cost, powerful personal computers and off-the-shelf software for data acquisition and processing, and by using Internet as a communication pathway to enable scientists to view and manipulate satellite data in real time at any ground location. The personal computer based ground support system is illustrated for the case of the cold plasma analyzer flown on the Freja satellite. Commercial software was used as building blocks for writing the ground support equipment software. Several levels of hardware support, including unit tests and development, functional tests, and integration were provided by portable and desktop personal computers. Satellite stations in Saskatchewan and Sweden were linked to the science team via phone lines and Internet, which provided remote control through a central point. These successful strategies will be used on future small satellite space programs.

  14. 76 FR 73509 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program; Delay of Effective...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF LABOR Employment and Training Administration Wage and Hour Division 20 CFR Part 655 RIN 1205-AB61 Wage Methodology for the Temporary Non-Agricultural Employment H- 2B Program; Delay of Effective Date; Impact on Prevailing Wage Determinations AGENCY: Employment and Training Administration...

  15. Ground Truth Studies - A hands-on environmental science program for students, grades K-12

    Science.gov (United States)

    Katzenberger, John; Chappell, Charles R.

    1992-01-01

    The paper discusses the background and the objectives of the Ground Truth Studies (GTSs), an activity-based teaching program which integrates local environmental studies with global change topics, utilizing remotely sensed earth imagery. Special attention is given to the five key concepts around which the GTS programs are organized, the pilot program, the initial pilot study evaluation, and the GTS Handbook. The GTS Handbook contains a primer on global change and remote sensing, aerial and satellite images, student activities, glossary, and an appendix of reference material. Also described is a K-12 teacher training model. International participation in the program is to be initiated during the 1992-1993 school year.

  16. The GPM Ground Validation Program: Pre to Post-Launch

    Science.gov (United States)

    Petersen, W. A.

    2014-12-01

    NASA GPM Ground Validation (GV) activities have transitioned from the pre to post-launch era. Prior to launch direct validation networks and associated partner institutions were identified world-wide, covering a plethora of precipitation regimes. In the U.S. direct GV efforts focused on use of new operational products such as the NOAA Multi-Radar Multi-Sensor suite (MRMS) for TRMM validation and GPM radiometer algorithm database development. In the post-launch, MRMS products including precipitation rate, types and data quality are being routinely generated to facilitate statistical GV of instantaneous and merged GPM products. To assess precipitation column impacts on product uncertainties, range-gate to pixel-level validation of both Dual-Frequency Precipitation Radar (DPR) and GPM microwave imager data are performed using GPM Validation Network (VN) ground radar and satellite data processing software. VN software ingests quality-controlled volumetric radar datasets and geo-matches those data to coincident DPR and radiometer level-II data. When combined MRMS and VN datasets enable more comprehensive interpretation of ground-satellite estimation uncertainties. To support physical validation efforts eight (one) field campaigns have been conducted in the pre (post) launch era. The campaigns span regimes from northern latitude cold-season snow to warm tropical rain. Most recently the Integrated Precipitation and Hydrology Experiment (IPHEx) took place in the mountains of North Carolina and involved combined airborne and ground-based measurements of orographic precipitation and hydrologic processes underneath the GPM Core satellite. One more U.S. GV field campaign (OLYMPEX) is planned for late 2015 and will address cold-season precipitation estimation, process and hydrology in the orographic and oceanic domains of western Washington State. Finally, continuous direct and physical validation measurements are also being conducted at the NASA Wallops Flight Facility multi

  17. Interim site characterization report and ground-water monitoring program for the Hanford site solid waste landfill

    International Nuclear Information System (INIS)

    Fruland, R.M.; Hagan, R.A.; Cline, C.S.; Bates, D.J.; Evans, J.C.; Aaberg, R.L.

    1989-07-01

    Federal and state regulations governing the operation of landfills require utilization of ground-water monitoring systems to determine whether or not landfill operations impact ground water at the point of compliance (ground water beneath the perimeter of the facility). A detection-level ground-water monitoring system was designed, installed, and initiated at the Hanford Site Solid Waste Landfill (SWL). Chlorinated hydrocarbons were detected at the beginning of the ground-water monitoring program and continue to be detected more than 1 year later. The most probable source of the chlorinated hydrocarbons is washwater discharged to the SWL between 1985 and 1987. This is an interim report and includes data from the characterization work that was performed during well installation in 1987, such as field observations, sediment studies, and geophysical logging results, and data from analyses of ground-water samples collected in 1987 and 1988, such as field parameter measurements and chemical analyses. 38 refs., 27 figs., 8 tabs

  18. Quad precision delay generator

    International Nuclear Information System (INIS)

    Krishnan, Shanti; Gopalakrishnan, K.R.; Marballi, K.R.

    1997-01-01

    A Quad Precision Delay Generator delays a digital edge by a programmed amount of time, varying from nanoseconds to microseconds. The output of this generator has an amplitude of the order of tens of volts and rise time of the order of nanoseconds. This was specifically designed and developed to meet the stringent requirements of the plasma focus experiments. Plasma focus is a laboratory device for producing and studying nuclear fusion reactions in hot deuterium plasma. 3 figs

  19. A Dynamic Programming-Based Heuristic for the Shift Design Problem in Airport Ground Handling

    DEFF Research Database (Denmark)

    Clausen, Tommy

    We consider the heterogeneous shift design problem for a workforce with multiple skills, where work shifts are created to cover a given demand as well as possible while minimizing cost and satisfying a flexible set of constraints. We focus mainly on applications within airport ground handling whe...... programming that allows flexibility in modeling the workforce. Parameters allow a planner to determine the level of demand coverage that best fulfills the requirements of the organization. Results are presented from several diverse real-life ground handling instances.......We consider the heterogeneous shift design problem for a workforce with multiple skills, where work shifts are created to cover a given demand as well as possible while minimizing cost and satisfying a flexible set of constraints. We focus mainly on applications within airport ground handling where...

  20. Estimating Delays In ASIC's

    Science.gov (United States)

    Burke, Gary; Nesheiwat, Jeffrey; Su, Ling

    1994-01-01

    Verification is important aspect of process of designing application-specific integrated circuit (ASIC). Design must not only be functionally accurate, but must also maintain correct timing. IFA, Intelligent Front Annotation program, assists in verifying timing of ASIC early in design process. This program speeds design-and-verification cycle by estimating delays before layouts completed. Written in C language.

  1. Density and fledging success of ground-nesting passerines in Conservation Reserve Program fields in the northeastern Great Plains

    Science.gov (United States)

    Koford, Rolf R.

    1999-01-01

    The Conservation Reserve Program, initiated in 1985, was designed primarily to reduce soil erosion and crop surpluses. A secondary benefit was the provision of habitat for wildlife. Grassland bird populations, many of which declined in the decades prior to the Conservation Reserve Program, may have benefited from the Conservation Reserve Program if reproduction in this newly available habitat has been at least as high as it would have been in the absence of the Conservation Reserve Program. On study areas in North Dakota and Minnesota, I examined breeding densities and fledging success of grassland birds in Conservation Reserve Program fields and in an alternative habitat of similar structure, idle grassland fields on federal Waterfowl Production Areas. Fields were 10 to 25 hectares in size. The avifaunas of these two habitats were similar, although brush-dependent species were more abundant on Waterfowl Protection Areas. The common species in these habitats included ones whose continental populations have declined, such as Grasshopper Sparrow (Ammodramus savannarum), Savannah Sparrow (Passerculus sandwichensis), and Bobolink (Dolichonyx oryzivorus). These ground-nesting species were pooled with other ground nesters in an analysis of fledging success, which revealed no significant differences between habitats, between states, or among years (1991-1993). Predation was the primary cause of nest failure. I concluded that Conservation Reserve Program fields in this region were suitable breeding habitat for several species whose populations had declined prior to the Conservation Reserve Program era. This habitat appeared to be as secure for nests of ground-nesting birds as another suitable habitat in North Dakota and Minnesota.

  2. Tunable Optical True-Time Delay Devices Would Exploit EIT

    Science.gov (United States)

    Kulikov, Igor; DiDomenico, Leo; Lee, Hwang

    2004-01-01

    Tunable optical true-time delay devices that would exploit electromagnetically induced transparency (EIT) have been proposed. Relative to prior true-time delay devices (for example, devices based on ferroelectric and ferromagnetic materials) and electronically controlled phase shifters, the proposed devices would offer much greater bandwidths. In a typical envisioned application, an optical pulse would be modulated with an ultra-wideband radio-frequency (RF) signal that would convey the information that one seeks to communicate, and it would be required to couple differently delayed replicas of the RF signal to the radiating elements of a phased-array antenna. One or more of the proposed devices would be used to impose the delays and/or generate the delayed replicas of the RF-modulated optical pulse. The beam radiated or received by the antenna would be steered by use of a microprocessor-based control system that would adjust operational parameters of the devices to tune the delays to the required values. EIT is a nonlinear quantum optical interference effect that enables the propagation of light through an initially opaque medium. A suitable medium must have, among other properties, three quantum states (see Figure 1): an excited state (state 3), an upper ground state (state 2), and a lower ground state (state 1). These three states must form a closed system that exhibits no decays to other states in the presence of either or both of two laser beams: (1) a probe beam having the wavelength corresponding to the photon energy equal to the energy difference between states 3 and 1; and (2) a coupling beam having the wavelength corresponding to the photon energy equal to the energy difference between states 3 and 2. The probe beam is the one that is pulsed and modulated with an RF signal.

  3. A nonlinear programming approach to lower bounds for the ground-state energy of helium

    International Nuclear Information System (INIS)

    Porras, I.; Feldmann, D.M.; King, F.W.

    1999-01-01

    Lower-bound estimates for the ground-state energy of the helium atom are determined using nonlinear programming techniques. Optimized lower bounds are determined for single-particle, radially correlated, and general correlated wave functions. The local nature of the method employed makes it a very severe test of the accuracy of the wave function

  4. Ground-water protection activities of the US Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    1987-02-01

    This report evaluates the internal consistency of NRC's ground-water protection programs. These programs have evolved consistently with growing public concerns about the significance of ground-water contamination and environmental impacts. Early NRC programs provided for protection of the public health and safety by minimizing releases of radionuclides. More recent programs have included provisions for minimizing releases of nonradiological constituents, mitigating environmental impacts, and correcting ground-water contamination. NRC's ground-water protection programs are categorized according to program areas, including nuclear materials and waste management (NMSS), nuclear reactor operation (NRR), confirmatory research and standards development (RES), inspection and enforcement (IE), and agreement state programs (SP). Based on analysis of existing ground-water protection programs within NRC, the interoffice Ground-water Protection Group has identified several inconsistencies between and within program areas. These inconsistencies include: (1) different definitions of the term ''ground-water,'' (2) variable regulation of nonradiological constituents in ground water, (3) different design periods for ground-water protection, and (4) different scopes and rigor of ground-water assessments. The second inconsistency stems from differences in statutory authority granted to the NRC. The third inconsistency is rationalized by recognizing differences in perceived risks associated with nuclear facilities. The Ground-water Protection Group will document its analysis of the remaining inconsistencies and make recommendations to reconcile or eliminate them in a subsequent report

  5. Grounding Anger Management

    Directory of Open Access Journals (Sweden)

    Odis E. Simmons, PhD

    2017-06-01

    Full Text Available One of the things that drew me to grounded theory from the beginning was Glaser and Strauss’ assertion in The Discovery of Grounded Theory that it was useful as a “theoretical foothold” for practical applications (p. 268. From this, when I was a Ph.D student studying under Glaser and Strauss in the early 1970s, I devised a GT based approach to action I later came to call “grounded action.” In this short paper I’ll present a very brief sketch of an anger management program I developed in 1992, using grounded action. I began my research by attending a two-day anger management training workshop designed for training professionals in the most commonly used anger management model. Like other intervention programs I had seen, this model took a psychologizing and pathologizing approach to the issue. Following this, I sat through the full course of an anger management program that used this model, observing the reactions of the participants and the approach of the facilitator. Following each session I conducted open-ended interviews with most of the participants, either individually or in groups of two or three. I had also done previous research in counseling and social work contexts that turned out to be very relevant to an anger management program design.

  6. Medicaid program; premiums and cost sharing. Final rule; delay of effective date and reopening of comment period.

    Science.gov (United States)

    2009-03-27

    This action temporarily delays the effective date of the November 25, 2008 final rule entitled, Medicaid Program; Premiums and Cost Sharing" (73 FR 71828) until December 31, 2009. In addition, this action reopens the comment period on the policies set out in the November 25, 2008 final rule, and specifically solicits comments on the effect of certain provisions of the American Recovery and Reinvestment Act of 2009.

  7. New Delay-Dependent Stability Criteria for Uncertain Neutral Systems with Mixed Time-Varying Delays and Nonlinear Perturbations

    Directory of Open Access Journals (Sweden)

    Hamid Reza Karimi

    2009-01-01

    Full Text Available The problem of stability analysis for a class of neutral systems with mixed time-varying neutral, discrete and distributed delays and nonlinear parameter perturbations is addressed. By introducing a novel Lyapunov-Krasovskii functional and combining the descriptor model transformation, the Leibniz-Newton formula, some free-weighting matrices, and a suitable change of variables, new sufficient conditions are established for the stability of the considered system, which are neutral-delay-dependent, discrete-delay-range-dependent, and distributed-delay-dependent. The conditions are presented in terms of linear matrix inequalities (LMIs and can be efficiently solved using convex programming techniques. Two numerical examples are given to illustrate the efficiency of the proposed method.

  8. From the ground up: building a minimally invasive aortic valve surgery program.

    Science.gov (United States)

    Nguyen, Tom C; Lamelas, Joseph

    2015-03-01

    Minimally invasive aortic valve replacement (MIAVR) is associated with numerous advantages including improved patient satisfaction, cosmesis, decreased transfusion requirements, and cost-effectiveness. Despite these advantages, little information exists on how to build a MIAVR program from the ground up. The steps to build a MIAVR program include compiling a multi-disciplinary team composed of surgeons, cardiologists, anesthesiologists, perfusionists, operating room (OR) technicians, and nurses. Once assembled, this team can then approach hospital administrators to present a cost-benefit analysis of MIAVR, emphasizing the importance of reduced resource utilization in the long-term to offset the initial financial investment that will be required. With hospital approval, training can commence to provide surgeons and other staff with the necessary knowledge and skills in MIAVR procedures and outcomes. Marketing and advertising of the program through the use of social media, educational conferences, grand rounds, and printed media will attract the initial patients. A dedicated website for the program can function as a "virtual lobby" for patients wanting to learn more. Initially, conservative selection criteria of cases that qualify for MIAVR will set the program up for success by avoiding complex co-morbidities and surgical techniques. During the learning curve phase of the program, patient safety should be a priority.

  9. Sleep Problems and Early Developmental Delay: Implications for Early Intervention Programs

    Science.gov (United States)

    Bonuck, Karen; Grant, Roy

    2012-01-01

    Sleep disorders negatively impact behavior, cognition, and growth--the same areas targeted by early intervention. Conversely, developmental delays and disabilities may themselves precipitate sleep disorders. Young children with developmental delays experience sleep disorders at a higher rate than do typically developing children; the most common…

  10. Hanford site ground water protection management plan

    International Nuclear Information System (INIS)

    1994-10-01

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities

  11. Delay in Diagnosis of Testicular Cancer; A Need for Awareness Programs

    NARCIS (Netherlands)

    Ozturk, Cigdem; Fleer, Joke; Hoekstra, Harald J.; Hoekstra-Weebers, Josette E. H. M.

    2015-01-01

    Background Aim To gain insight into patient and doctor delay in testicular cancer (TC) and factors associated with delay. Materials and Methods Sixty of the 66 eligible men; median age 26 (range 17-45) years, diagnosed with TC at the University Medical Center Groningen completed a questionnaire on

  12. Aviation System Capacity Program Terminal Area Productivity Project: Ground and Airborne Technologies

    Science.gov (United States)

    Giulianetti, Demo J.

    2001-01-01

    Ground and airborne technologies were developed in the Terminal Area Productivity (TAP) project for increasing throughput at major airports by safely maintaining good-weather operating capacity during bad weather. Methods were demonstrated for accurately predicting vortices to prevent wake-turbulence encounters and to reduce in-trail separation requirements for aircraft approaching the same runway for landing. Technology was demonstrated that safely enabled independent simultaneous approaches in poor weather conditions to parallel runways spaced less than 3,400 ft apart. Guidance, control, and situation-awareness systems were developed to reduce congestion in airport surface operations resulting from the increased throughput, particularly during night and instrument meteorological conditions (IMC). These systems decreased runway occupancy time by safely and smoothly decelerating the aircraft, increasing taxi speed, and safely steering the aircraft off the runway. Simulations were performed in which optimal trajectories were determined by air traffic control (ATC) and communicated to flight crews by means of Center TRACON Automation System/Flight Management System (CTASFMS) automation to reduce flight delays, increase throughput, and ensure flight safety.

  13. Delayed neutrons in liquid metal spallation targets

    International Nuclear Information System (INIS)

    Ridikas, D.; Bokov, P.; David, J.C.; Dore, D.; Giacri, M.L.; Van Lauwe, A.; Plukiene, R.; Plukis, A.; Ignatiev, S.; Pankratov, D.

    2003-01-01

    The next generation spallation neutron sources, neutrino factories or RIB production facilities currently being designed and constructed around the world will increase the average proton beam power on target by a few orders of magnitude. Increased proton beam power results in target thermal hydraulic issues leading to new target designs, very often based on flowing liquid metal targets such as Hg, Pb, Pb-Bi. Radioactive nuclides produced in liquid metal targets are transported into hot cells, past electronics, into pumps with radiation sensitive components, etc. Besides the considerable amount of photon activity in the irradiated liquid metal, a significant amount of the delayed neutron precursor activity can be accumulated in the target fluid. The transit time from the front of a liquid metal target into areas, where delayed neutrons may be important, can be as short as a few seconds, well within one half-life of many delayed neutron precursors. Therefore, it is necessary to evaluate the total neutron flux (including delayed neutrons) as a function of time and determine if delayed neutrons contribute significantly to the dose rate. In this study the multi-particle transport code MCNPX combined with the material evolution program CINDER'90 will be used to evaluate the delayed neutron flux and spectra. The following scientific issues will be addressed in this paper: - Modeling of a typical geometry of the liquid metal spallation target; - Predictions of the prompt neutron fluxes, fission fragment and spallation product distributions; - Comparison of the above parameters with existing experimental data; - Time-dependent calculations of delayed neutron precursors; - Neutron flux estimates due to the prompt and delayed neutron emission; - Proposal of an experimental program to measure delayed neutron spectra from high energy spallation-fission reactions. The results of this study should be directly applicable in the design study of the European MegaPie (1 MW

  14. Safeguarding Self-Governance: A Grounded Theory of Older Patients’ Pattern of Behavior in Relation to their Relatives in Fast-track Programs

    DEFF Research Database (Denmark)

    Berthelsen, Connie B.; Frederiksen, Kirsten; Lindhardt Damsgaard, Tove

    2014-01-01

    Abstract The aim of this study was to generate a grounded theory of older patients’ pattern of behavior in relation to their relatives’ involvement in fast-track programs during total joint replacement. Sixteen patients were recruited in orthopedic wards. Data collection included 11 interviews......, shielding, distancing, and masking. Keywords: Fast-track program, grounded theory, older patients, relatives, total joint replacement.......-governance emerged in the analysis as the core category of our theory and pattern of behavior of the older patients in relation to their relatives. The older patients’ main concern was to complete the fast-track program while maintaining autonomy, which they resolved through four strategies of actions: embracing...

  15. 13 CFR 120.1425 - Grounds for enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Grounds for enforcement actions-Intermediaries participating in the Microloan Program and NTAPs. 120.1425 Section 120.1425 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions § 120...

  16. Ground beetle (Coleoptera: Carabidae) assemblages in the Conservation Reserve Program crop rotation systems in Interior Alaska

    Science.gov (United States)

    Adult ground beetles (Coleoptera: Carabidae) abundance and diversity were documented on Conservation Research Program (CRP) agricultural lands in Delta Junction, Alaska (64ºN, 145º W). Twenty species were documented based on a total sample of 6,116 specimens collected during 2006 and 2007. Two speci...

  17. Isotope Brayton ground demonstration testing and flight qualification. Volume 1. Technical program

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-09

    A program is proposed for the ground demonstration, development, and flight qualification of a radioisotope nuclear heated dynamic power system for use on space missions beginning in the 1980's. This type of electrical power system is based upon and combines two aerospace technologies currently under intense development; namely, the MHW isotope heat source and the closed Brayton cycle gas turbine. This power system represents the next generation of reliable, efficient economic electrical power equipment for space, and will be capable of providing 0.5 to 2.0 kW of electric power to a wide variety of spacecraft for earth orbital and interplanetary missions. The immediate design will be based upon the requirements for the Air Force SURVSATCOM mission. The proposal is presented in three volumes plus an Executive Summary. This volume describes the tasks in the technical program.

  18. Aircraft and ground vehicle friction correlation test results obtained under winter runway conditions during joint FAA/NASA Runway Friction Program

    Science.gov (United States)

    Yager, Thomas J.; Vogler, William A.; Baldasare, Paul

    1988-01-01

    Aircraft and ground vehicle friction data collected during the Joint FAA/NASA Runway Friction Program under winter runway conditions are discussed and test results are summarized. The relationship between the different ground vehicle friction measurements obtained on compacted snow- and ice-covered conditions is defined together with the correlation to aircraft tire friction performance under similar runway conditions.

  19. Causes of project implementation delay in the Ethiopian Electric ...

    African Journals Online (AJOL)

    This study identifies the major sources of delay in the implementation of construction projects in the Ethiopian electric utility enterprise. It also investigates the magnitude of schedule variance and cost overrun experienced by the Universal Electric Access Program (UEAP)due to implementation delay. Primary data were ...

  20. How youth get engaged: grounded-theory research on motivational development in organized youth programs.

    Science.gov (United States)

    Dawes, Nickki Pearce; Larson, Reed

    2011-01-01

    For youth to benefit from many of the developmental opportunities provided by organized programs, they need to not only attend but become psychologically engaged in program activities. This research was aimed at formulating empirically based grounded theory on the processes through which this engagement develops. Longitudinal interviews were conducted with 100 ethnically diverse youth (ages 14–21) in 10 urban and rural arts and leadership programs. Qualitative analysis focused on narrative accounts from the 44 youth who reported experiencing a positive turning point in their motivation or engagement. For 38 of these youth, this change process involved forming a personal connection. Similar to processes suggested by self-determination theory (Ryan & Deci, 2000), forming a personal connection involved youth's progressive integration of personal goals with the goals of program activities. Youth reported developing a connection to 3 personal goals that linked the self with the activity: learning for the future, developing competence, and pursuing a purpose. The role of purpose for many youth suggests that motivational change can be driven by goals that transcend self-needs. These findings suggest that youth need not enter programs intrinsically engaged--motivation can be fostered--and that programs should be creative in helping youth explore ways to form authentic connections to program activities.

  1. A modular finite-element model (MODFE) for areal and axisymmetric ground-water-flow problems, Part 3: Design philosophy and programming details

    Science.gov (United States)

    Torak, L.J.

    1993-01-01

    A MODular Finite-Element, digital-computer program (MODFE) was developed to simulate steady or unsteady-state, two-dimensional or axisymmetric ground-water-flow. The modular structure of MODFE places the computationally independent tasks that are performed routinely by digital-computer programs simulating ground-water flow into separate subroutines, which are executed from the main program by control statements. Each subroutine consists of complete sets of computations, or modules, which are identified by comment statements, and can be modified by the user without affecting unrelated computations elsewhere in the program. Simulation capabilities can be added or modified by either adding or modifying subroutines that perform specific computational tasks, and the modular-program structure allows the user to create versions of MODFE that contain only the simulation capabilities that pertain to the ground-water problem of interest. MODFE is written in a Fortran programming language that makes it virtually device independent and compatible with desk-top personal computers and large mainframes. MODFE uses computer storage and execution time efficiently by taking advantage of symmetry and sparseness within the coefficient matrices of the finite-element equations. Parts of the matrix coefficients are computed and stored as single-subscripted variables, which are assembled into a complete coefficient just prior to solution. Computer storage is reused during simulation to decrease storage requirements. Descriptions of subroutines that execute the computational steps of the modular-program structure are given in tables that cross reference the subroutines with particular versions of MODFE. Programming details of linear and nonlinear hydrologic terms are provided. Structure diagrams for the main programs show the order in which subroutines are executed for each version and illustrate some of the linear and nonlinear versions of MODFE that are possible. Computational aspects of

  2. How robotics programs influence young women's career choices : a grounded theory model

    Science.gov (United States)

    Craig, Cecilia Dosh-Bluhm

    The fields of engineering, computer science, and physics have a paucity of women despite decades of intervention by universities and organizations. Women's graduation rates in these fields continue to stagnate, posing a critical problem for society. This qualitative grounded theory (GT) study sought to understand how robotics programs influenced young women's career decisions and the program's effect on engineering, physics, and computer science career interests. To test this, a study was mounted to explore how the FIRST (For Inspiration and Recognition of Science and Technology) Robotics Competition (FRC) program influenced young women's college major and career choices. Career theories suggested that experiential programs coupled with supportive relationships strongly influence career decisions, especially for science, technology, engineering, and mathematics careers. The study explored how and when young women made career decisions and how the experiential program and! its mentors and role models influenced career choice. Online focus groups and interviews (online and face-to-face) with 10 female FRC alumnae and GT processes (inductive analysis, open coding, categorizations using mind maps and content clouds) were used to generate a general systems theory style model of the career decision process for these young women. The study identified gender stereotypes and other career obstacles for women. The study's conclusions include recommendations to foster connections to real-world challenges, to develop training programs for mentors, and to nurture social cohesion, a mostly untapped area. Implementing these recommendations could help grow a critical mass of women in engineering, physics, and computer science careers, a social change worth pursuing.

  3. A monolithic constant-fraction discriminator using distributed R-C delay-line shaping

    International Nuclear Information System (INIS)

    Simpson, M.L.; Young, G.R.; Xu, M.

    1995-01-01

    A monolithic, CMOS, constant-fraction discriminator (CFD) was fabricated in the Orbit Semiconductor, 1.2 μ N-well process. This circuit uses an on-chip, distributed, R-C delay-line to realize the constant-fraction shaping. The delay-line is constructed from a narrow, 500-μ serpentine layer of polysilicon above a wide, grounded, second layer of polysilicon. This R-C delay-line generates about 1.1 ns of delay for 5 ns risetime signals with a slope degradation of only ≅ 15% and an amplitude reduction of about 6.1%. The CFD also features an automatic walk adjustment. The entire circuit, including the delay line, has a 200 μ pitch and is 950 μ long. The walk for a 5 ns risetime signal was measured as ± 100 ps over the 100:1 dynamic range from -15 mV to -1.5 mV. to -1.5 V. The CFD consumes 15 mW

  4. DEFENSE PROGRAMS RISK MANAGEMENT FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2012-01-01

    Full Text Available For the past years defense programs have faced delays in delivering defense capabilities and budget overruns. Stakeholders are looking for ways to improve program management and the decision making process given the very fluid and uncertain economic and political environment. Consequently, they have increasingly resorted to risk management as the main management tool for achieving defense programs objectives and for delivering the defense capabilities strongly needed for the soldiers on the ground on time and within limited defense budgets. Following a risk management based decision-making approach the stakeholders are expected not only to protect program objectives against a wide range of risks but, at the same time, to take advantage of the opportunities to increase the likelihood of program success. The prerequisite for making risk management the main tool for achieving defense programs objectives is the design and implementation of a strong risk management framework as a foundation providing an efficient and effective application of the best risk management practices. The aim of this paper is to examine the risk management framework for defense programs based on the ISO 31000:2009 standard, best risk management practices and the defense programs’ needs and particularities. For the purposes of this article, the term of defense programs refers to joint defense programs.

  5. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    Science.gov (United States)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  6. Ground-Water Availability in the United States

    Science.gov (United States)

    Reilly, Thomas E.; Dennehy, Kevin F.; Alley, William M.; Cunningham, William L.

    2008-01-01

    Ground water is among the Nation's most important natural resources. It provides half our drinking water and is essential to the vitality of agriculture and industry, as well as to the health of rivers, wetlands, and estuaries throughout the country. Large-scale development of ground-water resources with accompanying declines in ground-water levels and other effects of pumping has led to concerns about the future availability of ground water to meet domestic, agricultural, industrial, and environmental needs. The challenges in determining ground-water availability are many. This report examines what is known about the Nation's ground-water availability and outlines a program of study by the U.S. Geological Survey Ground-Water Resources Program to improve our understanding of ground-water availability in major aquifers across the Nation. The approach is designed to provide useful regional information for State and local agencies who manage ground-water resources, while providing the building blocks for a national assessment. The report is written for a wide audience interested or involved in the management, protection, and sustainable use of the Nation's water resources.

  7. Procedures for ground-water investigations

    International Nuclear Information System (INIS)

    1992-12-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water monitoring procedures are developed and used in accordance with the PNL Quality Assurance Program

  8. The ramifications of a delay in the national high-level waste repository program

    International Nuclear Information System (INIS)

    Vance, S.A.

    1988-05-01

    This thesis examines the ramifications to the nuclear power industry if a national high-level waste repository is not operational by 1998 as mandated in the Nuclear Waste Policy Act. The principal effect of a delay examined here is the potential shortage of spent fuel storage. In order to assess this impact, a computer model of a nuclear utility was developed. Data for 107 US reactors was then entered into the model to assess the impact for individual facilities. This model estimates that a delay to the year 2003 will cost industry between $21.4 million and $35.8 million in 1988 dollars. Similarly, a delay to the year 2010 is estimated to have between a $85.4 million and $142.4 million impact. Four other potential effects of a delay on industry are also examined: the potential inadequacy of the Nuclear Waste Fund; an increased difficulty in obtaining licenses from the Nuclear Regulatory Commission; increased friction between industry and the Department of Energy; and a decline in public acceptance of nuclear power. This thesis also presents a framework for developing a policy to deal with the potential effects of a delay. An argument is made for a policy which includes anticipation, participation, and education. 15 refs., 6 figs., 3 tabs

  9. Medicare and Medicaid programs; physicians' referrals to health care entities with which they have financial relationships: partial delay of effective date. Interim final rule with comment period; partial delay in effective date.

    Science.gov (United States)

    2001-12-03

    This interim final rule with comment period delays for 1 year the effective date of the last sentence of 42 CFR 411.354(d)(1). Section 411.354(d)(1) was promulgated in the final rule entitled "Medicare and Medicaid Programs; Physicians' Referrals to Health Care Entities With Which They Have Financial Relationships," published in the Federal Register on January 4, 2001 (66 FR 856). A 1-year delay in the effective date of the last sentence in Section 411.354(d)(1) will give Department officials the opportunity to reconsider the definition of compensation that is "set in advance" as it relates to percentage compensation methodologies in order to avoid unnecessarily disrupting existing contractual arrangements for physician services. Accordingly, the last sentence of Section 411.354(d)(1), which would have become effective January 4, 2002, will not become effective until January 6,2003.

  10. Maternal Obesity: Risks for Developmental Delays in Early Childhood.

    Science.gov (United States)

    Duffany, Kathleen O'Connor; McVeigh, Katharine H; Kershaw, Trace S; Lipkind, Heather S; Ickovics, Jeannette R

    2016-02-01

    To assess the risk for neurodevelopmental delays for children of mothers who were obese (≥200 pounds) prior to pregnancy, and to characterize delays associated with maternal obesity among children referred to and found eligible to receive Early Intervention Program services. We conducted a retrospective cohort study (N = 541,816) using a population-based New York City data warehouse with linked birth and Early Intervention data. Risks for children suspected of a delay and 'significantly delayed', with two moderate or one severe delay, were calculated. Among the group of children eligible by delay for Early Intervention, analyses assessed risk for being identified with a moderate-to-severe delay across each of five functional domains as well as risks for multiple delays. Children of mothers who were obese were more likely to be suspected of a delay (adjusted RR 1.19 [CI 1.15-1.22]) and borderline association for 'significantly delayed' (adjusted RR 1.01 [CI 1.00-1.02). Among children eligible by delay, children of mothers who were obese evidenced an increased risk for moderate-to-severe cognitive (adjusted RR 1.04 [CI 1.02-1.07]) and physical (adjusted RR 1.04 [CI 1.01-1.08]) delays and for global developmental delay (adjusted RR 1.05 [CI 1.01-1.08]). Maternal obesity is associated with increased risk of developmental delay in offspring. Among children with moderate or severe delays, maternal obesity is associated with increased risk of cognitive and physical delays as well as with increased risk for global developmental delay. While causation remains uncertain, this adds to the growing body of research reporting an association between maternal obesity and neurodevelopmental delays in offspring.

  11. End-to-End Delay Model for Train Messaging over Public Land Mobile Networks

    Directory of Open Access Journals (Sweden)

    Franco Mazzenga

    2017-11-01

    Full Text Available Modern train control systems rely on a dedicated radio network for train to ground communications. A number of possible alternatives have been analysed to adopt the European Rail Traffic Management System/European Train Control System (ERTMS/ETCS control system on local/regional lines to improve transport capacity. Among them, a communication system based on public networks (cellular&satellite provides an interesting, effective and alternative solution to proprietary and expensive radio networks. To analyse performance of this solution, it is necessary to model the end-to-end delay and message loss to fully characterize the message transfer process from train to ground and vice versa. Starting from the results of a railway test campaign over a 300 km railway line for a cumulative 12,000 traveled km in 21 days, in this paper, we derive a statistical model for the end-to-end delay required for delivering messages. In particular, we propose a two states model allowing for reproducing the main behavioral characteristics of the end-to-end delay as observed experimentally. Model formulation has been derived after deep analysis of the recorded experimental data. When it is applied to model a realistic scenario, it allows for explicitly accounting for radio coverage characteristics, the received power level, the handover points along the line and for the serving radio technology. As an example, the proposed model is used to generate the end-to-end delay profile in a realistic scenario.

  12. Ground-water sample collection and analysis plan for the ground-water surveillance project

    International Nuclear Information System (INIS)

    Bryce, R.W.; Evans, J.C.; Olsen, K.B.

    1991-12-01

    The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy's (DOE's) Hanford Site in support of DOE's environmental surveillance responsibilities. The purpose of this document is to translate DOE's General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives

  13. Examination of Communication Delays on Team Performance: Utilizing the International Space Station (ISS) as a Test Bed for Analog Research

    Science.gov (United States)

    Keeton, K. E.; Slack, K, J.; Schmidt, L. L.; Ploutz-Snyder, R.; Baskin, P.; Leveton, L. B.

    2011-01-01

    Operational conjectures about space exploration missions of the future indicate that space crews will need to be more autonomous from mission control and operate independently. This is in part due to the expectation that communication quality between the ground and exploration crews will be more limited and delayed. Because of potential adverse effects on communication quality, both researchers and operational training and engineering experts have suggested that communication delays and the impact these delays have on the quality of communications to the crew will create performance decrements if crews are not given adequate training and tools to support more autonomous operations. This presentation will provide an overview of a research study led by the Behavioral Health and Performance Element (BHP) of the NASA Human Research Program that examines the impact of implementing a communication delay on ISS on individual and team factors and outcomes, including performance and related perceptions of autonomy. The methodological design, data collection efforts, and initial results of this study to date will be discussed . The results will focus on completed missions, DRATS and NEEMO15. Lessons learned from implementing this study within analog environments will also be discussed. One lesson learned is that the complexities of garnishing a successful data collection campaign from these high fidelity analogs requires perseverance and a strong relationship with operational experts. Results of this study will provide a preliminary understanding of the impact of communication delays on individual and team performance as well as an insight into how teams perform and interact in a space-like environment . This will help prepare for implementation of communication delay tests on the ISS, targeted for Increment 35/36.

  14. Modeling delay in genetic networks: from delay birth-death processes to delay stochastic differential equations.

    Science.gov (United States)

    Gupta, Chinmaya; López, José Manuel; Azencott, Robert; Bennett, Matthew R; Josić, Krešimir; Ott, William

    2014-05-28

    Delay is an important and ubiquitous aspect of many biochemical processes. For example, delay plays a central role in the dynamics of genetic regulatory networks as it stems from the sequential assembly of first mRNA and then protein. Genetic regulatory networks are therefore frequently modeled as stochastic birth-death processes with delay. Here, we examine the relationship between delay birth-death processes and their appropriate approximating delay chemical Langevin equations. We prove a quantitative bound on the error between the pathwise realizations of these two processes. Our results hold for both fixed delay and distributed delay. Simulations demonstrate that the delay chemical Langevin approximation is accurate even at moderate system sizes. It captures dynamical features such as the oscillatory behavior in negative feedback circuits, cross-correlations between nodes in a network, and spatial and temporal information in two commonly studied motifs of metastability in biochemical systems. Overall, these results provide a foundation for using delay stochastic differential equations to approximate the dynamics of birth-death processes with delay.

  15. Modeling delay in genetic networks: From delay birth-death processes to delay stochastic differential equations

    Energy Technology Data Exchange (ETDEWEB)

    Gupta, Chinmaya; López, José Manuel; Azencott, Robert; Ott, William [Department of Mathematics, University of Houston, Houston, Texas 77004 (United States); Bennett, Matthew R. [Department of Biochemistry and Cell Biology, Rice University, Houston, Texas 77204, USA and Institute of Biosciences and Bioengineering, Rice University, Houston, Texas 77005 (United States); Josić, Krešimir [Department of Mathematics, University of Houston, Houston, Texas 77004 (United States); Department of Biology and Biochemistry, University of Houston, Houston, Texas 77204 (United States)

    2014-05-28

    Delay is an important and ubiquitous aspect of many biochemical processes. For example, delay plays a central role in the dynamics of genetic regulatory networks as it stems from the sequential assembly of first mRNA and then protein. Genetic regulatory networks are therefore frequently modeled as stochastic birth-death processes with delay. Here, we examine the relationship between delay birth-death processes and their appropriate approximating delay chemical Langevin equations. We prove a quantitative bound on the error between the pathwise realizations of these two processes. Our results hold for both fixed delay and distributed delay. Simulations demonstrate that the delay chemical Langevin approximation is accurate even at moderate system sizes. It captures dynamical features such as the oscillatory behavior in negative feedback circuits, cross-correlations between nodes in a network, and spatial and temporal information in two commonly studied motifs of metastability in biochemical systems. Overall, these results provide a foundation for using delay stochastic differential equations to approximate the dynamics of birth-death processes with delay.

  16. Modeling delay in genetic networks: From delay birth-death processes to delay stochastic differential equations

    International Nuclear Information System (INIS)

    Gupta, Chinmaya; López, José Manuel; Azencott, Robert; Ott, William; Bennett, Matthew R.; Josić, Krešimir

    2014-01-01

    Delay is an important and ubiquitous aspect of many biochemical processes. For example, delay plays a central role in the dynamics of genetic regulatory networks as it stems from the sequential assembly of first mRNA and then protein. Genetic regulatory networks are therefore frequently modeled as stochastic birth-death processes with delay. Here, we examine the relationship between delay birth-death processes and their appropriate approximating delay chemical Langevin equations. We prove a quantitative bound on the error between the pathwise realizations of these two processes. Our results hold for both fixed delay and distributed delay. Simulations demonstrate that the delay chemical Langevin approximation is accurate even at moderate system sizes. It captures dynamical features such as the oscillatory behavior in negative feedback circuits, cross-correlations between nodes in a network, and spatial and temporal information in two commonly studied motifs of metastability in biochemical systems. Overall, these results provide a foundation for using delay stochastic differential equations to approximate the dynamics of birth-death processes with delay

  17. Multicultural Ground Teams in Space Programs

    Science.gov (United States)

    Maier, M.

    2012-01-01

    In the early years of space flight only two countries had access to space. In the last twenty years, there have been major changes in how we conduct space business. With the fall of the iron curtain and the growing of the European Union, more and more players were able to join the space business and space science. By end of the last century, numerous countries, agencies and companies earned the right to be equal partners in space projects. This paper investigates the impact of multicultural teams in the space arena. Fortunately, in manned spaceflight, especially for long duration missions, there are several studies and simulations reporting on multicultural team impact. These data have not been as well explored on the team interactions within the ground crews. The focus of this paper are the teams working on the ISS project. Hypotheses will be drawn from the results of space crew research to determine parallels and differences for this vital segment of success in space missions. The key source of the data will be drawn from structured interviews with managers and other ground crews on the ISS project.

  18. Behavior Problems in Toddlers with and without Developmental Delays: Comparison of Treatment Outcomes

    Science.gov (United States)

    Holtz, Casey A.; Carrasco, Jennifer M.; Mattek, Ryan J.; Fox, Robert A.

    2009-01-01

    The purpose of this study is to examine the effectiveness of an in-home parent management program for toddlers with behavior problems and developmental delays by comparing outcomes for a group of toddlers with developmental delays (n = 27) and a group of toddlers without developmental delays (n = 27). The majority of children lived in single…

  19. Mechanisms of time-based figure-ground segregation.

    Science.gov (United States)

    Kandil, Farid I; Fahle, Manfred

    2003-11-01

    Figure-ground segregation can rely on purely temporal information, that is, on short temporal delays between positional changes of elements in figure and ground (Kandil, F.I. & Fahle, M. (2001) Eur. J. Neurosci., 13, 2004-2008). Here, we investigate the underlying mechanisms by measuring temporal segregation thresholds for various kinds of motion cues. Segregation can rely on monocular first-order motion (based on luminance modulation) and second-order motion cues (contrast modulation) with a high temporal resolution of approximately 20 ms. The mechanism can also use isoluminant motion with a reduced temporal resolution of 60 ms. Figure-ground segregation can be achieved even at presentation frequencies too high for human subjects to inspect successive frames individually. In contrast, when stimuli are presented dichoptically, i.e. separately to both eyes, subjects are unable to perceive any segregation, irrespective of temporal frequency. We propose that segregation in these displays is detected by a mechanism consisting of at least two stages. On the first level, standard motion or flicker detectors signal local positional changes (flips). On the second level, a segregation mechanism combines the local activities of the low-level detectors with high temporal precision. Our findings suggest that the segregation mechanism can rely on monocular detectors but not on binocular mechanisms. Moreover, the results oppose the idea that segregation in these displays is achieved by motion detectors of a higher order (motion-from-motion), but favour mechanisms sensitive to short temporal delays even without activation of higher-order motion detectors.

  20. Shared control on lunar spacecraft teleoperation rendezvous operations with large time delay

    Science.gov (United States)

    Ya-kun, Zhang; Hai-yang, Li; Rui-xue, Huang; Jiang-hui, Liu

    2017-08-01

    Teleoperation could be used in space on-orbit serving missions, such as object deorbits, spacecraft approaches, and automatic rendezvous and docking back-up systems. Teleoperation rendezvous and docking in lunar orbit may encounter bottlenecks for the inherent time delay in the communication link and the limited measurement accuracy of sensors. Moreover, human intervention is unsuitable in view of the partial communication coverage problem. To solve these problems, a shared control strategy for teleoperation rendezvous and docking is detailed. The control authority in lunar orbital maneuvers that involves two spacecraft as rendezvous and docking in the final phase was discussed in this paper. The predictive display model based on the relative dynamic equations is established to overcome the influence of the large time delay in communication link. We discuss and attempt to prove via consistent, ground-based simulations the relative merits of fully autonomous control mode (i.e., onboard computer-based), fully manual control (i.e., human-driven at the ground station) and shared control mode. The simulation experiments were conducted on the nine-degrees-of-freedom teleoperation rendezvous and docking simulation platform. Simulation results indicated that the shared control methods can overcome the influence of time delay effects. In addition, the docking success probability of shared control method was enhanced compared with automatic and manual modes.

  1. The effect of adding a home program to weekly institutional-based therapy for children with undefined developmental delay: a pilot randomized clinical trial.

    Science.gov (United States)

    Tang, Mei-Hua; Lin, Chin-Kai; Lin, Wen-Hsien; Chen, Chao-Huei; Tsai, Sen-Wei; Chang, Yin-Yi

    2011-06-01

    Early rehabilitation for children with developmental delay without a defined etiology have included home and clinic programs, but no comparisons have been made and efficacy is uncertain. We compared a weekly visit for institutional-based therapy (IT) to IT plus a structured home activity program (HAP). Seventy children who were diagnosed with motor or global developmental delay (ages 6-48 months and mean developmental age 12.5 months) without defined etiology were recruited (including 45 males and 23 females). The outcomes included the comprehensive developmental inventory for infants and toddlers test and the pediatric evaluation of disability inventory. Children who received only IT improved in developmental level by 2.11 months compared with 3.11 months for those who received a combination of IT and HAP (p = 0.000). On all domains of the comprehensive developmental inventory for infants and toddlers test, except for self-help, children who participated in HAP showed greater improvements, including in cognition (p = 0.015), language (p = 0.010), motor (p = 0.000), and social (p = 0.038) domains. Except on the subdomain of self-care with caregiver assistance, the HAP group showed greater improvement in all the pediatric evaluation of disability inventory subdomains (p < 0.05). Early intervention programs are helpful for these children, and the addition of structured home activity programs may augment the effects on developmental progression. Copyright © 2011. Published by Elsevier B.V.

  2. Pump-dump-probe and pump-repump-probe ultrafast spectroscopy resolves cross section of an early ground state intermediate and stimulated emission in the photoreactions of the Pr ground state of the cyanobacterial phytochrome Cph1.

    Science.gov (United States)

    Fitzpatrick, Ann E; Lincoln, Craig N; van Wilderen, Luuk J G W; van Thor, Jasper J

    2012-01-26

    The primary photoreactions of the red absorbing ground state (Pr) of the cyanobacterial phytochrome Cph1 from Synechocystis PCC 6803 involve C15═C16 Z-E photoisomerization of its phycocyanobilin chromophore. The first observable product intermediate in pump-probe measurements of the photocycle, "Lumi-R", is formed with picosecond kinetics and involves excited state decay reactions that have 3 and 14 ps time constants. Here, we have studied the photochemical formation of the Lumi-R intermediate using multipulse picosecond visible spectroscopy. Pump-dump-probe (PDP) and pump-repump-probe (PRP) experiments were carried out by employing two femtosecond visible pulses with 1, 14, and 160 ps delays, together with a broadband dispersive visible probe. The time delays between the two excitation pulses have been selected to allow interaction with the dominant (3 and 14 ps) kinetic phases of Lumi-R formation. The frequency dependence of the PDP and PRP amplitudes was investigated at 620, 640, 660, and 680 nm, covering excited state absorption (λ(max) = 620 nm), ground state absorption (λ(max) = 660 nm), and stimulated emission (λ(max) = 680 nm) cross sections. Experimental double difference transient absorbance signals (ΔΔOD), from the PDP and PRP measurements, required corrections to remove contributions from ground state repumping. The sensitivity of the resulting ΔΔOD signals was systematically investigated for possible connectivity schemes and photochemical parameters. When applying a homogeneous (sequentially decaying) connectivity scheme in both the 3 and 14 ps kinetic phases, evidence for repumping of an intermediate that has an electronic ground state configuration (GSI) is taken from the dump-induced S1 formation with 620, 640, and 660 nm wavelengths and 1 and 14 ps repump delays. Evidence for repumping a GSI is also seen, for the same excitation wavelengths, when imposing a target connectivity scheme proposed in the literature for the 1 ps repump delay. In

  3. Developing and implementing institutional controls for ground water remediation

    International Nuclear Information System (INIS)

    Ulland, L.M.; Cooper, M.G.

    1995-01-01

    The US DOE has initiated its Ground Water Project as the second phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project authorized under the Uranium Mill Tailings Radiation Control Act (UMTRCA). In the Ground Water Project, the DOE must reduce risk from ground water contaminated by uranium mill processing activities at 24 inactive processing sites by meeting the US EPA standards. The UMTRCA also requires consistency with federal statutes such as the Resource Conservation and Recovery Act (RCRA). The use of institutional controls to reduce risk from contaminated ground water is one element of compliance with standards and the protection of public health and the environment. Institutional controls are active or passive measures that reduce exposure to risks by preventing intrusion or restricting direct access to an area, or restricting access to the contamination through secondary means. Because of inconsistent regulations and multi-party authorities for ground water management, the key to selecting and implementing effective institutional controls lies with developing a consensus between the parties responsible for ground water remediation; those with authority to implement, monitor, and maintain institutional controls; and those facing the risks from contaminated ground water. These parties must develop a consensus for an institutional control program that meets minimum regulatory requirements and protects public health and the environment. Developing consensus and implementing a successful institutional controls program was achieved by the DOE during the cleanup of uranium mill tailings. An effective institutional controls program can also be developed to protect against risks from contaminated ground water. Consensus building and information transmission are the critical elements of an institutional control program that protects human health and the environment from risks associated with ground water contamination

  4. Optimal Joint Expected Delay Forwarding in Delay Tolerant Networks

    OpenAIRE

    Jia Xu; Xin Feng; Wen Jun Yang; Ru Chuan Wang; Bing Qing Han

    2013-01-01

    Multicopy forwarding schemes have been employed in delay tolerant network (DTN) to improve the delivery delay and delivery rate. Much effort has been focused on reducing the routing cost while retaining high performance. This paper aims to provide an optimal joint expected delay forwarding (OJEDF) protocol which minimizes the expected delay while satisfying a certain constant on the number of forwardings per message. We propose a comprehensive forwarding metric called joint expected delay (JE...

  5. A Prototype of Tropospheric Delay Correction in L1-SAIF Augmentation

    Science.gov (United States)

    Takeichi, Noboru; Sakai, Takeyasu; Fukushima, Sounosuke; Ito, Ken

    L1-SAIF signal is one of the navigation signals of Quasi-Zenith Satellite System, which provides an augmentation function for mobile users in Japan. This paper presents the detail of the tropospheric delay correction in L1-SAIF augmentation. The tropospheric delay correction information is generated at the ground station using the data collected at GEONET (GPS Earth Observation NETwork) stations. The correction message contains the information of the zenith tropospheric delay (ZTD) values at 105 Tropospheric Grid Points (TGP) in the experiment area. From this message a mobile user can acquire the ZTD value at some neighboring TGPs, and estimate the local ZTD value accurately by using a suitable ZTD model function. Only 3 L1-SAIF messages are necessary to provide all of the tropospheric correction information. Several investigations using the actual data observed at many GEONET stations overall Japan have proved that it is possible to achieve the correction accuracy of 13.2mm (rms).

  6. An overview of the joint FAA/NASA aircraft/ground runway friction program

    Science.gov (United States)

    Yager, Thomas J.

    1989-01-01

    There is a need for information on runways which may become slippery due to various forms and types of contaminants. Experience has shown that since the beginning of all weather aircraft operations, there have been landing and aborted takeoff incidents and/or accidents each year where aircraft have either run off the end or veered off the shoulder of low friction runways. NASA Langley's Landing and Impact Dynamics Branch is involved in several research programs directed towards obtaining a better understanding of how different tire properties interact with varying pavement surface characteristics to produce acceptable performance for aircraft ground handling requirements. One such effort, which was jointly supported by not only NASA and the FAA but by several aviation industry groups including the Flight Safety Foundation, is described.

  7. Automatic test pattern generation for stuck-at and delay faults in combinational circuits

    International Nuclear Information System (INIS)

    Kim, Dae Sik

    1998-02-01

    The present studies are developed to propose the automatic test pattern generation (ATG) algorithms for combinational circuits. These ATG algorithms are realized in two ATG programs: One is the ATG program for stuck-at fault and the other one for delay faults. In order to accelerate the ATG process, these two ATG programs have a common feature (the search method based on the concept of the degree of freedom), whereas only ATG program for the delay fault utilizes the 19-valued logic, a type of composite valued logic. This difference between two ATG programs results from the difference of the target fault. Accelerating the ATG process is indispensable for improving the ATG algorithms. This acceleration is mainly achieved by reducing the number of the unnecessary backtrackings, making the earlier detection of the conflicts, and shortening the computation time between the implication. Because of this purpose, the developed ATG programs include the new search method based on the concept of the degree of freedom (DF). The DF concept, computed directly and easily from the system descriptions such as types of gates and their interconnections, is the criterion to decide which, among several alternate lines' logic values required along each path, promises to be the most effective in order to accelerate and improve the ATG process. This DF concept is utilized to develop and improve both of ATG programs for stuck-at and delay faults in combinational circuits. In addition to improving the ATG process, reducing number of test pattern is indispensable for testing the delay faults because the size of the delay faults grows rapidly as increasing the size of the circuit. In order to improve the compactness of the test set, 19-valued logic are derived. Unlike other TG logic systems, 19-valued logic is utilized to generate the robustly hazard-free test pattern. This is achieved by using the basic 5-valued logic, proposed in this work, where the transition with no hazard is

  8. Ground Truth Annotation in T Analyst

    DEFF Research Database (Denmark)

    2015-01-01

    This video shows how to annotate the ground truth tracks in the thermal videos. The ground truth tracks are produced to be able to compare them to tracks obtained from a Computer Vision tracking approach. The program used for annotation is T-Analyst, which is developed by Aliaksei Laureshyn, Ph...

  9. Transitions in midwestern ground water law

    International Nuclear Information System (INIS)

    Bowman, J.A.; Clark, G.R.

    1989-01-01

    The evolution of ground-water law in eight states in the Midwest (Illinois, Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio, and Wisconsin) is examined, and a review of transitions in ground-water doctrines is presented. Two underlying themes in changing ground-water management are communicated. First, ground-water law is evolving from private property rules of capture based on the absolute ownership doctrines to rules requiring conservation and sharing of ground water as a public resource. Second, in both courts and state legislatures, a proactive role of ground-water management is emerging, again, with an emphasis on sharing. Both of these trends are apparent in the Midwest. In the last decade midwestern states have (1) seen significant shifts in court decisions on ground-water use with greater recognition of the reciprocal or mutually dependent nature of ground-water rights, and (2) seen increased legislative development of comprehensive ground-water management statutes that emphasize the reciprocal liabilities of ground-water use. These trends are examined and ground-water management programs discussed for eight states in the Midwest

  10. Further development of the methodical instruments to calculate ground water movements at repository sites

    International Nuclear Information System (INIS)

    Arens, G.; Clauser, C.; Fein, E.; Karpinski, P.; Storck, R.

    1990-06-01

    In addition to the subsequent requirements concerning the Konrad plan approval procedure, other ground water and propagation calculations were also made. All available programs were used. Simple one- and two-dimensional models were considered for which an analytical solution exists. In some cases such analytical solutions are only approximate under certain conditions. By calculating such simple problems, the programs used were tested and verified, and the use of those programs was reviewed and documented. In addition to the finite-difference program SWIFT and the finite-element program CFEST, two other ground water and propagation programs were applied: 1) Finite-difference program MOL, two-dimensional propagation program for ground water flow; 2) SUTRA, two-dimensional hybrid finite-element and integrated finite-difference model for ground water flow and radionuclide migration. (orig./HP) [de

  11. PHAST--a program for simulating ground-water flow, solute transport, and multicomponent geochemical reactions

    Science.gov (United States)

    Parkhurst, David L.; Kipp, Kenneth L.; Engesgaard, Peter; Charlton, Scott R.

    2004-01-01

    The computer program PHAST simulates multi-component, reactive solute transport in three-dimensional saturated ground-water flow systems. PHAST is a versatile ground-water flow and solute-transport simulator with capabilities to model a wide range of equilibrium and kinetic geochemical reactions. The flow and transport calculations are based on a modified version of HST3D that is restricted to constant fluid density and constant temperature. The geochemical reactions are simulated with the geochemical model PHREEQC, which is embedded in PHAST. PHAST is applicable to the study of natural and contaminated ground-water systems at a variety of scales ranging from laboratory experiments to local and regional field scales. PHAST can be used in studies of migration of nutrients, inorganic and organic contaminants, and radionuclides; in projects such as aquifer storage and recovery or engineered remediation; and in investigations of the natural rock-water interactions in aquifers. PHAST is not appropriate for unsaturated-zone flow, multiphase flow, density-dependent flow, or waters with high ionic strengths. A variety of boundary conditions are available in PHAST to simulate flow and transport, including specified-head, flux, and leaky conditions, as well as the special cases of rivers and wells. Chemical reactions in PHAST include (1) homogeneous equilibria using an ion-association thermodynamic model; (2) heterogeneous equilibria between the aqueous solution and minerals, gases, surface complexation sites, ion exchange sites, and solid solutions; and (3) kinetic reactions with rates that are a function of solution composition. The aqueous model (elements, chemical reactions, and equilibrium constants), minerals, gases, exchangers, surfaces, and rate expressions may be defined or modified by the user. A number of options are available to save results of simulations to output files. The data may be saved in three formats: a format suitable for viewing with a text editor; a

  12. Mapping the Antarctic grounding line with CryoSat-2 radar altimetry

    Science.gov (United States)

    Bamber, J. L.; Dawson, G. J.

    2017-12-01

    The grounding line, where grounded ice begins to float, is the boundary at which the ocean has the greatest influence on the ice-sheet. Its position and dynamics are critical in assessing the stability of the ice-sheet, for mass budget calculations and as an input into numerical models. The most reliable approaches to map the grounding line remotely are to measure the limit of tidal flexure of the ice shelf using differential synthetic aperture radar interferometry (DInSAR) or ICESat repeat-track measurements. However, these methods are yet to provide satisfactory spatial and temporal coverage of the whole of the Antarctic grounding zone. It has not been possible to use conventional radar altimetry to map the limit of tidal flexure of the ice shelf because it performs poorly near breaks in slope, commonly associated with the grounding zone. The synthetic aperture radar interferometric (SARin) mode of CryoSat-2, performs better over steeper margins of the ice sheet and allows us to achieve this. The SARin mode combines "delay Doppler" processing with a cross-track interferometer, and enables us to use elevations based on the first return (point of closest approach or POCA) and "swath processed" elevations derived from the time-delayed waveform beyond the first return, to significantly improve coverage. Here, we present a new method to map the limit of tidal motion from a combination of POCA and swath data. We test this new method on the Siple Coast region of the Ross Ice Shelf, and the mapped grounding line is in good agreement with previous observations from DinSAR and ICESat measurements. There is, however, an approximately constant seaward offset between these methods and ours, which we believe is due to the poorer precision of CryoSat-2. This new method has improved the coverage of the grounding zone across the Siple Coast, and can be applied to the rest of Antarctica.

  13. Effects of delaying the operation of a nuclear power plant

    International Nuclear Information System (INIS)

    Hill, L.J.; Rainey, J.A.; Tepel, R.C.; Van Dyke, J.W.

    1983-12-01

    This report documents a study of an actual 24-month nuclear power plant licensing delay. A representative utility was chosen for examination. The research was oriented toward determination of the licensing delay's impact on the utility's operating results, ratepayers, and security issues. The methodology utilized to estimate those impacts involved the recursive interaction of a generation costing program to estimate replacement fuel costs and a financial regulatory model to concomitantly determine the impact on the utility, its ratepayers and security issues. The latter model was executed under six alternate scenarios: (1) no delay in the plant's operation; (2) a 24-month delay; (3) a 24-month delay but further assuming all replacement power was generated by coal-fired plants; (4) a 24-month delay assuming all replacement power from oil-fired plants; (5) no delay but assuming the capital cost of the plant was twice as large; and (6) a 24-month delay with the capital cost of the plant twice as large. Three primary conclusions were made. First, under all scenarios, a 24-month delay in operation of the plant has an adverse impact on the utility's internal generation of funds. Second, although electricity rates are not appreciably affected by the delay, the direction of electricity price changes is contingent on the source of fuel used for replacement power. Finally, a 24-month delay has an adverse impact on the indicators used to evaluate the financial soundness of the utility in all cases under consideration

  14. Shaping a valued learning journey: Student satisfaction with learning in undergraduate nursing programs, a grounded theory study.

    Science.gov (United States)

    Smith, Morgan R; Grealish, Laurie; Henderson, Saras

    2018-05-01

    Student satisfaction is a quality measure of increasing importance in undergraduate programs, including nursing programs. To date theories of student satisfaction have focused primarily on students' perceptions of the educational environment rather than their perceptions of learning. Understanding how students determine satisfaction with learning is necessary to facilitate student learning across a range of educational contexts and meet the expectations of diverse stakeholders. To understand undergraduate nursing students' satisfaction with learning. Constructivist grounded theory methodology was used to identify how nursing students determined satisfaction with learning. Two large, multi-campus, nursing schools in Australia. Seventeen demographically diverse undergraduate nursing students studying different stages of a three year program participated in the study. Twenty nine semi-structured interviews were conducted. Students were invited to describe situations where they had been satisfied or dissatisfied with their learning. A constructivist grounded theory approach was used to analyse the data. Students are satisfied with learning when they shape a valued learning journey that accommodates social contexts of self, university and nursing workplace. The theory has three phases. Phase 1 - orienting self to valued learning in the pedagogical landscape; phase 2 - engaging with valued learning experiences across diverse pedagogical terrain; and phase 3 - recognising valued achievement along the way. When students experience a valued learning journey they are satisfied with their learning. Student satisfaction with learning is unique to the individual, changes over time and maybe transient or sustained, mild or intense. Finding from the research indicate areas where nurse academics may facilitate satisfaction with learning in undergraduate nursing programs while mindful of the expectations of other stakeholders such as the university, nurse registering authorities

  15. Intelligent systems for KSC ground processing

    Science.gov (United States)

    Heard, Astrid E.

    1992-01-01

    The ground processing and launch of Shuttle vehicles and their payloads is the primary task of Kennedy Space Center. It is a process which is largely manual and contains little inherent automation. Business is conducted today much as it was during previous NASA programs such as Apollo. In light of new programs and decreasing budgets, NASA must find more cost effective ways in which to do business while retaining the quality and safety of activities. Advanced technologies including artificial intelligence could cut manpower and processing time. This paper is an overview of the research and development in Al technology at KSC with descriptions of the systems which have been implemented, as well as a few under development which are promising additions to ground processing software. Projects discussed cover many facets of ground processing activities, including computer sustaining engineering, subsystem monitor and diagnosis tools and launch team assistants. The deployed Al applications have proven an effectiveness which has helped to demonstrate the benefits of utilizing intelligent software in the ground processing task.

  16. Stability and delay sensitivity of neutral fractional-delay systems.

    Science.gov (United States)

    Xu, Qi; Shi, Min; Wang, Zaihua

    2016-08-01

    This paper generalizes the stability test method via integral estimation for integer-order neutral time-delay systems to neutral fractional-delay systems. The key step in stability test is the calculation of the number of unstable characteristic roots that is described by a definite integral over an interval from zero to a sufficient large upper limit. Algorithms for correctly estimating the upper limits of the integral are given in two concise ways, parameter dependent or independent. A special feature of the proposed method is that it judges the stability of fractional-delay systems simply by using rough integral estimation. Meanwhile, the paper shows that for some neutral fractional-delay systems, the stability is extremely sensitive to the change of time delays. Examples are given for demonstrating the proposed method as well as the delay sensitivity.

  17. PV Systems Reliability Final Technical Report: Ground Fault Detection

    Energy Technology Data Exchange (ETDEWEB)

    Lavrova, Olga [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Flicker, Jack David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Johnson, Jay [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-01-01

    We have examined ground faults in PhotoVoltaic (PV) arrays and the efficacy of fuse, current detection (RCD), current sense monitoring/relays (CSM), isolation/insulation (Riso) monitoring, and Ground Fault Detection and Isolation (GFID) using simulations based on a Simulation Program with Integrated Circuit Emphasis SPICE ground fault circuit model, experimental ground faults installed on real arrays, and theoretical equations.

  18. Caregiver-Provided Physical Therapy Home Programs for Children with Motor Delay: A Scoping Review.

    Science.gov (United States)

    Gorgon, Edward James R

    2018-06-01

    Caregiver-provided physical therapy home programs (PTHP) play an important role in enhancing motor outcomes in pediatric patient populations. This scoping review systematically mapped clinical trials of caregiver-provided PTHP that were aimed at enhancing motor outcomes in children who have or who are at risk for motor delay, with the purpose of (1) describing trial characteristics; (2) assessing methodologic quality; and (3) examining the reporting of caregiver-related components. Physiotherapy Evidence Database (PEDro), Cochrane CENTRAL, PubMed, Scopus, ScienceDirect, ProQuest Central, CINAHL, LILACS, and OTseeker were searched up to July 31, 2017. Two reviewers independently assessed study eligibility. Randomized or quasi-randomized controlled trials on PTHP administered by parents, other family members, friends, or informal caregivers to children who had or who were at risk for motor delay were included. Two reviewers independently appraised trial quality on the PEDro scale and extracted data. Twenty-four articles representing 17 individual trials were identified. Populations and interventions investigated were heterogeneous. Most of the trials had important research design limitations and methodological issues that could limit usefulness in ascertaining the effectiveness of caregiver-provided PTHP. Few (4 of 17) trials indicated involvement of caregivers in the PTHP planning, assessed how the caregivers learned from the training or instructions provided, or carried out both. Included studies were heterogeneous, and unpublished data were excluded. Although caregiver-provided PTHP are important in addressing motor outcomes in this population, there is a lack of evidence at the level of clinical trials to guide practice. More research is urgently needed to determine the effectiveness of care-giver-provided PTHP. Future studies should address the many important issues identified in this scoping review to improve the usefulness of the trial results.

  19. Hanford Site ground-water surveillance for 1989

    International Nuclear Information System (INIS)

    Evans, J.C.; Bryce, R.W.; Bates, D.J.; Kemner, M.L.

    1990-06-01

    This annual report of ground-water surveillance activities provides discussions and listings of results for ground-water monitoring at the Hanford Site during 1989. The Pacific Northwest Laboratory (PNL) assesses the impacts of Hanford operations on the environment for the US Department of Energy (DOE). The impact Hanford operations has on ground water is evaluated through the Hanford Site Ground-Water Surveillance program. Five hundred and sixty-seven wells were sampled during 1989 for Hanford ground-water monitoring activities. This report contains a listing of analytical results for calendar year (CY) 1989 for species of importance as potential contaminants. 30 refs., 29 figs,. 4 tabs

  20. Regional earthquakes followed by delayed ground uplifts at Campi Flegrei Caldera, Italy: Arguments for a causal link

    Science.gov (United States)

    Lupi, Matteo; Frehner, Marcel; Weis, Philipp; Skelton, Alasdair; Saenger, Erik H.; Tisato, Nicola; Geiger, Sebastian; Chiodini, Giovanni; Driesner, Thomas

    2017-09-01

    Earthquake-triggered volcanic activity promoted by dynamic and static stresses are considered rare and difficult-to-capture geological processes. Calderas are ideal natural laboratories to investigate earthquake-volcano interactions due to their sensitivity to incoming seismic energy. The Campi Flegrei caldera, Italy, is one of the most monitored volcanic systems worldwide. We compare ground elevation time series at Campi Flegrei with earthquake catalogues showing that uplift events at Campi Flegrei are associated with large regional earthquakes. Such association is supported by (yet non-definitive) binomial tests. Over a 70-year time window we identify 14 uplift events, 12 of them were preceded by an earthquake, and for 8 of them the earthquake-to-uplift timespan ranges from immediate responses to 1.2 yr. Such variability in the response delay may be due to the preparedness of the system with faster responses probably occurring in periods during which the Campi Flegrei system was already in a critical state. To investigate the process that may be responsible for the proposed association we simulate the propagation of elastic waves and show that passing body waves impose high dynamic strains at the roof of the magmatic reservoir of the Campi Flegrei at about 7 km depth. This may promote a short-lived embrittlement of the magma reservoir's carapace otherwise marked by a ductile behaviour. Such failure allows magma and exsolved volatiles to be released from the magmatic reservoir. The fluids, namely exsolved volatiles and/or melts, ascend through a nominally plastic zone above the magmatic reservoir. This mechanism and the associated inherent uncertainties require further investigations but the new concept already implies that geological processes triggered by passing seismic waves may become apparent several months after passage of the seismic waves.

  1. Beta-delayed proton decay of 73Sr

    International Nuclear Information System (INIS)

    Batchelder, J.C.; Moltz, D.M.; Ognibene, T.J.; Rowe, M.W.; Tighe, R.J.; Cerny, J.

    1993-01-01

    The T z =-3/2, A=4n+1 nuclide 73 Sr produced in the 40 Ca( 36 Ar,3n) reaction has been observed via beta-delayed proton emission. A single proton group at a laboratory energy of 3.75±0.04 MeV has been observed, corresponding to decay of the T=3/2 isobaric analog state in 73 Rb to the ground state of 72 Kr. Combining this measurement with a Coulomb displacement energy calculation yields a mass excess for 73 Sr of -31.82±0.24 MeV based on a predicted mass for 72 Kr of -53.94±0.24 MeV

  2. DEPDOSE: An interactive, microcomputer based program to calculate doses from exposure to radionuclides deposited on the ground

    International Nuclear Information System (INIS)

    Beres, D.A.; Hull, A.P.

    1991-12-01

    DEPDOSE is an interactive, menu driven, microcomputer based program designed to rapidly calculate committed dose from radionuclides deposited on the ground. The program is designed to require little or no computer expertise on the part of the user. The program consisting of a dose calculation section and a library maintenance section. These selections are available to the user from the main menu. The dose calculation section provides the user with the ability to calculate committed doses, determine the decay time needed to reach a particular dose, cross compare deposition data from separate locations, and approximate a committed dose based on a measured exposure rate. The library maintenance section allows the user to review and update dose modifier data as well as to build and maintain libraries of radionuclide data, dose conversion factors, and default deposition data. The program is structured to provide the user easy access for reviewing data prior to running the calculation. Deposition data can either be entered by the user or imported from other databases. Results can either be displayed on the screen or sent to the printer

  3. Launch and Landing Effects Ground Operations (LLEGO) Model

    Science.gov (United States)

    2008-01-01

    LLEGO is a model for understanding recurring launch and landing operations costs at Kennedy Space Center for human space flight. Launch and landing operations are often referred to as ground processing, or ground operations. Currently, this function is specific to the ground operations for the Space Shuttle Space Transportation System within the Space Shuttle Program. The Constellation system to follow the Space Shuttle consists of the crewed Orion spacecraft atop an Ares I launch vehicle and the uncrewed Ares V cargo launch vehicle. The Constellation flight and ground systems build upon many elements of the existing Shuttle flight and ground hardware, as well as upon existing organizations and processes. In turn, the LLEGO model builds upon past ground operations research, modeling, data, and experience in estimating for future programs. Rather than to simply provide estimates, the LLEGO model s main purpose is to improve expenses by relating complex relationships among functions (ground operations contractor, subcontractors, civil service technical, center management, operations, etc.) to tangible drivers. Drivers include flight system complexity and reliability, as well as operations and supply chain management processes and technology. Together these factors define the operability and potential improvements for any future system, from the most direct to the least direct expenses.

  4. Mixed integer nonlinear programming model of wireless pricing scheme with QoS attribute of bandwidth and end-to-end delay

    Science.gov (United States)

    Irmeilyana, Puspita, Fitri Maya; Indrawati

    2016-02-01

    The pricing for wireless networks is developed by considering linearity factors, elasticity price and price factors. Mixed Integer Nonlinear Programming of wireless pricing model is proposed as the nonlinear programming problem that can be solved optimally using LINGO 13.0. The solutions are expected to give some information about the connections between the acceptance factor and the price. Previous model worked on the model that focuses on bandwidth as the QoS attribute. The models attempt to maximize the total price for a connection based on QoS parameter. The QoS attributes used will be the bandwidth and the end to end delay that affect the traffic. The maximum goal to maximum price is achieved when the provider determine the requirement for the increment or decrement of price change due to QoS change and amount of QoS value.

  5. Distributed Optimal Consensus Control for Multiagent Systems With Input Delay.

    Science.gov (United States)

    Zhang, Huaipin; Yue, Dong; Zhao, Wei; Hu, Songlin; Dou, Chunxia; Huaipin Zhang; Dong Yue; Wei Zhao; Songlin Hu; Chunxia Dou; Hu, Songlin; Zhang, Huaipin; Dou, Chunxia; Yue, Dong; Zhao, Wei

    2018-06-01

    This paper addresses the problem of distributed optimal consensus control for a continuous-time heterogeneous linear multiagent system subject to time varying input delays. First, by discretization and model transformation, the continuous-time input-delayed system is converted into a discrete-time delay-free system. Two delicate performance index functions are defined for these two systems. It is shown that the performance index functions are equivalent and the optimal consensus control problem of the input-delayed system can be cast into that of the delay-free system. Second, by virtue of the Hamilton-Jacobi-Bellman (HJB) equations, an optimal control policy for each agent is designed based on the delay-free system and a novel value iteration algorithm is proposed to learn the solutions to the HJB equations online. The proposed adaptive dynamic programming algorithm is implemented on the basis of a critic-action neural network (NN) structure. Third, it is proved that local consensus errors of the two systems and weight estimation errors of the critic-action NNs are uniformly ultimately bounded while the approximated control policies converge to their target values. Finally, two simulation examples are presented to illustrate the effectiveness of the developed method.

  6. Grounding Teacher Education in Practice around the World: An Examination of Teacher Education Coursework in Teacher Education Programs in Finland, Norway, and the United States

    Science.gov (United States)

    Jenset, Inga Staal; Klette, Kirsti; Hammerness, Karen

    2018-01-01

    Worldwide, teacher educators and policy makers have called for teacher preparation that is more deeply linked to practice. Yet we know little about how such linkages are achieved within different international programs. We examine the degree to which programs provide opportunities to learn that are grounded in practice, during university…

  7. Utilization of GPS Tropospheric Delays for Climate Research

    International Nuclear Information System (INIS)

    Suparta, Wayan

    2017-01-01

    The tropospheric delay is one of the main error sources in Global Positioning Systems (GPS) and its impact plays a crucial role in near real-time weather forecasting. Accessibility and accurate estimation of this parameter are essential for weather and climate research. Advances in GPS application has allowed the measurements of zenith tropospheric delay (ZTD) in all weather conditions and on a global scale with fine temporal and spatial resolution. In addition to the rapid advancement of GPS technology and informatics and the development of research in the field of Earth and Planetary Sciences, the GPS data has been available free of charge. Now only required sophisticated processing techniques but user friendly. On the other hand, the ZTD parameter obtained from the models or measurements needs to be converted into precipitable water vapor (PWV) to make it more useful as a component of weather forecasting and analysis atmospheric hazards such as tropical storms, flash floods, landslide, pollution, and earthquake as well as for climate change studies. This paper addresses the determination of ZTD as a signal error or delay source during the propagation from the satellite to a receiver on the ground and is a key driving force behind the atmospheric events. Some results in terms of ZTD and PWV will be highlighted in this paper. (paper)

  8. Measurement of ground motion in various sites

    International Nuclear Information System (INIS)

    Bialowons, W.; Amirikas, R.; Bertolini, A.; Kruecker, D.

    2007-04-01

    Ground vibrations may affect low emittance beam transport in linear colliders, Free Electron Lasers (FEL) and synchrotron radiation facilities. This paper is an overview of a study program to measure ground vibrations in various sites which can be used for site characterization in relation to accelerator design. Commercial broadband seismometers have been used to measure ground vibrations and the resultant database is available to the scientific community. The methodology employed is to use the same equipment and data analysis tools for ease of comparison. This database of ground vibrations taken in 19 sites around the world is first of its kind. (orig.)

  9. Is the shuttle delay good news for the AMS?

    CERN Multimedia

    2008-01-01

    The delay of two months (or longer) for the Atlantis STS-122 mission, carrying the European laboratory module Columbus to the International Space Station (ISS), is going to have repercussions that will impact the space program for years to come.

  10. Fuzzy delay model based fault simulator for crosstalk delay fault test ...

    Indian Academy of Sciences (India)

    In this paper, a fuzzy delay model based crosstalk delay fault simulator is proposed. As design trends move towards nanometer technologies, more number of new parameters affects the delay of the component. Fuzzy delay models are ideal for modelling the uncertainty found in the design and manufacturing steps.

  11. Half-lives of ground and isomeric states in {sup 97}Cd and the astrophysical origin of {sup 96}Ru

    Energy Technology Data Exchange (ETDEWEB)

    Lorusso, G., E-mail: lorusso@ribf.riken.j [National Superconducting Cyclotron Laboratory, Michigan State University, East Lansing, MI 48824 (United States); Joint Institute for Nuclear Astrophysics, Michigan State University, East Lansing, MI 48824 (United States); Department of Physics and Astronomy, Michigan State University, East Lansing, MI 48824 (United States); Becerril, A.; Amthor, A. [National Superconducting Cyclotron Laboratory, Michigan State University, East Lansing, MI 48824 (United States); Joint Institute for Nuclear Astrophysics, Michigan State University, East Lansing, MI 48824 (United States); Department of Physics and Astronomy, Michigan State University, East Lansing, MI 48824 (United States); Baumann, T.; Bazin, D. [National Superconducting Cyclotron Laboratory, Michigan State University, East Lansing, MI 48824 (United States); Berryman, J.S. [National Superconducting Cyclotron Laboratory, Michigan State University, East Lansing, MI 48824 (United States); Department of Chemistry, Michigan State University, East Lansing, MI 48824 (United States); Brown, B.A. [National Superconducting Cyclotron Laboratory, Michigan State University, East Lansing, MI 48824 (United States); Joint Institute for Nuclear Astrophysics, Michigan State University, East Lansing, MI 48824 (United States); Department of Physics and Astronomy, Michigan State University, East Lansing, MI 48824 (United States); Cyburt, R.H. [National Superconducting Cyclotron Laboratory, Michigan State University, East Lansing, MI 48824 (United States); Joint Institute for Nuclear Astrophysics, Michigan State University, East Lansing, MI 48824 (United States); Crawford, H.L. [National Superconducting Cyclotron Laboratory, Michigan State University, East Lansing, MI 48824 (United States); Department of Chemistry, Michigan State University, East Lansing, MI 48824 (United States)

    2011-05-09

    First experimental evidence for a high-spin isomer (25/2{sup +}) in {sup 97}Cd, a waiting point in the astrophysical rapid proton capture process, is presented. The data were obtained in {beta}-decay studies at NSCL using the new RF Fragment Separator system and detecting {beta}-delayed protons and {beta}-delayed {gamma} rays. Decays from ground and isomeric states were disentangled, and proton emission branches were determined for the first time. We find half-lives of 1.10(8) s and 3.8(2) s, and {beta}-delayed proton emission branches of 12(2)% and 25(4)% were deduced for the ground and isomeric states, respectively. With these results, the nuclear data needed to determine an rp-process contribution to the unknown origin of solar {sup 96}Ru are in place. When the new data are included in astrophysical rp-process calculations, one finds that an rp-process origin of {sup 96}Ru is unlikely.

  12. Academic delay of gratification, self-efficacy, and time management among academically unprepared college students.

    Science.gov (United States)

    Bembenutty, Héfer

    2009-04-01

    This study examined the associations between academic delay of gratification, self-efficacy beliefs, and time management among academically unprepared college students participating in a summer-immersion program. This study also examined whether the relation of self-efficacy with time management is mediated by academic delay of gratification. Analysis indicated that self-efficacy was directly associated with time management, as delay of gratification served to mediate this effect partially. Self-efficacy emerged as the strongest positive predictor of academic achievement.

  13. On the cost/delay tradeoff of wireless delay tolerant geographic routing

    OpenAIRE

    Tasiopoulos, Argyrios; Tsiaras, Christos; Toumpis, Stavros

    2012-01-01

    In Delay Tolerant Networks (DTNs), there is a fundamental tradeoff between the aggregate transport cost of a packet and the delay in its delivery. We study this tradeoff in the context of geographical routing in wireless DTNs.We ?rst specify the optimal cost/delay tradeoff, i.e., the tradeoff under optimal network operation, using a dynamic network construction termed the Cost/Delay Evolving Graph (C/DEG) and the Optimal Cost/Delay Curve (OC/DC), a function that gives the minimum possible agg...

  14. Leveraging delay discounting for health: Can time delays influence food choice?

    Science.gov (United States)

    Appelhans, Bradley M; French, Simone A; Olinger, Tamara; Bogucki, Michael; Janssen, Imke; Avery-Mamer, Elizabeth F; Powell, Lisa M

    2018-03-15

    Delay discounting, the tendency to choose smaller immediate rewards over larger delayed rewards, is theorized to promote consumption of immediately rewarding but unhealthy foods at the expense of long-term weight maintenance and nutritional health. An untested implication of delay discounting models of decision-making is that selectively delaying access to less healthy foods may promote selection of healthier (immediately available) alternatives, even if they may be less desirable. The current study tested this hypothesis by measuring healthy versus regular vending machine snack purchasing before and during the implementation of a 25-s time delay on the delivery of regular snacks. Purchasing was also examined under a $0.25 discount on healthy snacks, a $0.25 tax on regular snacks, and the combination of both pricing interventions with the 25-s time delay. Across 32,019 vending sales from three separate vending locations, the 25-s time delay increased healthy snack purchasing from 40.1% to 42.5%, which was comparable to the impact of a $0.25 discount (43.0%). Combining the delay and the discount had a roughly additive effect (46.0%). However, the strongest effects were seen under the $0.25 tax on regular snacks (53.7%) and the combination of the delay and the tax (50.2%). Intervention effects varied substantially between vending locations. Importantly, time delays did not harm overall vending sales or revenue, which is relevant to the real-world feasibility of this intervention. More investigation is needed to better understand how the impact of time delays on food choice varies across populations, evaluate the effects of time delays on beverage vending choices, and extend this approach to food choices in contexts other than vending machines. ClinicalTrials.gov, NCT02359916. Copyright © 2018 Elsevier Ltd. All rights reserved.

  15. Delay in Presentation, Diagnosis, and Treatment for Breast Cancer Patients in Jordan.

    Science.gov (United States)

    Abu-Helalah, Ahmad Munir; Alshraideh, Hussam Ahmad; Al-Hanaqtah, Mo'tasem; Da'na, Moh'd; Al-Omari, Asim; Mubaidin, Rasmi

    2016-01-01

    Breast cancer is the most common cancer, and one of the leading causes of death for females in Jordan and many countries in the world. Studies have shown that delay in symptoms presentation, diagnosis or treatment would result in poor prognosis. There has been no published study from Jordan on delays in patient presentation, delays in diagnosis, or delays in treatment. Therefore, we conducted this study to assess these important quality indicators aiming to improve prognosis for breast cancer patients in Jordan. This project was a cross-sectional study on female breast cancer patients in Jordan. The total number of participants was 327. The proportion of patients with presentation delay, diagnosis delay, and treatment delay was 32.2%, 49.1%, or 32.4%, respectively. The main reported reasons for delay in presentation were ignorance of the nature of the problem (65.6%), limited/lack of knowledge that symptoms were suggestive of cancer diagnosis (16.7%), and misdiagnosis (16.7%). Predictors of delay and mean time for presentation, diagnosis, and treatment were identified. Our results reveal that breast cancer patients in Jordan are experiencing delays in presentation, diagnosis, and treatment. This could justify the advanced stages at diagnosis and poor outcomes for breast cancer patients in Jordan. We recommend revising the current early detection and down-staging programs in Jordan. © 2015 Wiley Periodicals, Inc.

  16. Representing delayed force feedback as a combination of current and delayed states.

    Science.gov (United States)

    Avraham, Guy; Mawase, Firas; Karniel, Amir; Shmuelof, Lior; Donchin, Opher; Mussa-Ivaldi, Ferdinando A; Nisky, Ilana

    2017-10-01

    To adapt to deterministic force perturbations that depend on the current state of the hand, internal representations are formed to capture the relationships between forces experienced and motion. However, information from multiple modalities travels at different rates, resulting in intermodal delays that require compensation for these internal representations to develop. To understand how these delays are represented by the brain, we presented participants with delayed velocity-dependent force fields, i.e., forces that depend on hand velocity either 70 or 100 ms beforehand. We probed the internal representation of these delayed forces by examining the forces the participants applied to cope with the perturbations. The findings showed that for both delayed forces, the best model of internal representation consisted of a delayed velocity and current position and velocity. We show that participants relied initially on the current state, but with adaptation, the contribution of the delayed representation to adaptation increased. After adaptation, when the participants were asked to make movements with a higher velocity for which they had not previously experienced with the delayed force field, they applied forces that were consistent with current position and velocity as well as delayed velocity representations. This suggests that the sensorimotor system represents delayed force feedback using current and delayed state information and that it uses this representation when generalizing to faster movements. NEW & NOTEWORTHY The brain compensates for forces in the body and the environment to control movements, but it is unclear how it does so given the inherent delays in information transmission and processing. We examined how participants cope with delayed forces that depend on their arm velocity 70 or 100 ms beforehand. After adaptation, participants applied opposing forces that revealed a partially correct representation of the perturbation using the current and the

  17. An Analysis of Delay and Travel Times at Sao Paulo International Airport (AISP/GRU): Planning Based on Simulation Model

    Science.gov (United States)

    Santana, Erico Soriano Martins; Mueller, Carlos

    2003-01-01

    The occurrence of flight delays in Brazil, mostly verified at the ground (airfield), is responsible for serious disruptions at the airport level but also for the unchaining of problems in all the airport system, affecting also the airspace. The present study develops an analysis of delay and travel times at Sao Paulo International Airport/ Guarulhos (AISP/GRU) airfield based on simulation model. Different airport physical and operational scenarios had been analyzed by means of simulation. SIMMOD Plus 4.0, the computational tool developed to represent aircraft operation in the airspace and airside of airports, was used to perform these analysis. The study was mainly focused on aircraft operations on ground, at the airport runway, taxi-lanes and aprons. The visualization of the operations with increasing demand facilitated the analyses. The results generated in this work certify the viability of the methodology, they also indicated the solutions capable to solve the delay problem by travel time analysis, thus diminishing the costs for users mainly airport authority. It also indicated alternatives for airport operations, assisting the decision-making process and in the appropriate timing of the proposed changes in the existing infrastructure.

  18. Revised ground-water monitoring compliance plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    1986-09-01

    This document contains ground-water monitoring plans for a mixed waste storage facility located on the Hanford Site in southeastern Washington State. This facility has been used since 1973 for storage of mixed wastes, which contain both chemicals and radionuclides. The ground-water monitoring plans presented here represent revision and expansion of an effort in June 1985. At that time, a facility-specific monitoring program was implemented at the 183-H Basins as part of the regulatory compliance effort being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interimstatus facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The program initially implemented for the 183-H Basins was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. This effort, named the RCRA Compliance Ground-Water Monitoring Project for the 183-H Basins, was implemented. A supporting project involving ground-water flow modeling for the area surrounding the 183-H Basins was also initiated during 1985. Those efforts and the results obtained are described in subsequent chapters of this document. 26 refs., 55 figs., 14 tabs

  19. Asymptotic Delay Analysis for Cross-Layer Delay-Based Routing in Ad Hoc Networks

    Directory of Open Access Journals (Sweden)

    Philippe Jacquet

    2007-01-01

    Full Text Available This paper addresses the problem of the evaluation of the delay distribution via analytical means in IEEE 802.11 wireless ad hoc networks. We show that the asymptotic delay distribution can be expressed as a power law. Based on the latter result, we present a cross-layer delay estimation protocol and we derive new delay-distribution-based routing algorithms, which are well adapted to the QoS requirements of real-time multimedia applications. In fact, multimedia services are not sensitive to average delays, but rather to the asymptotic delay distributions. Indeed, video streaming applications drop frames when they are received beyond a delay threshold, determined by the buffer size. Although delay-distribution-based routing is an NP-hard problem, we show that it can be solved in polynomial time when the delay threshold is large, because of the asymptotic power law distribution of the link delays.

  20. Ground-Water Quality Data in the Central Sierra Study Unit, 2006 - Results from the California GAMA Program

    Science.gov (United States)

    Ferrari, Matthew J.; Fram, Miranda S.; Belitz, Kenneth

    2008-01-01

    Ground-water quality in the approximately 950 square kilometer (370 square mile) Central Sierra study unit (CENSIE) was investigated in May 2006 as part of the Priority Basin Assessment project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The GAMA Priority Basin Assessment project was developed in response to the Ground-Water Quality Monitoring Act of 2001, and is being conducted by the U.S. Geological Survey (USGS) in cooperation with the California State Water Resources Control Board (SWRCB). This study was designed to provide a spatially unbiased assessment of the quality of raw ground water used for drinking-water supplies within CENSIE, and to facilitate statistically consistent comparisons of ground-water quality throughout California. Samples were collected from thirty wells in Madera County. Twenty-seven of the wells were selected using a spatially distributed, randomized grid-based method to provide statistical representation of the study area (grid wells), and three were selected to aid in evaluation of specific water-quality issues (understanding wells). Ground-water samples were analyzed for a large number of synthetic organic constituents (volatile organic compounds [VOCs], gasoline oxygenates and degradates, pesticides and pesticide degradates), constituents of special interest (N-nitrosodimethylamine, perchlorate, and 1,2,3-trichloropropane), naturally occurring inorganic constituents [nutrients, major and minor ions, and trace elements], radioactive constituents, and microbial indicators. Naturally occurring isotopes [tritium, and carbon-14, and stable isotopes of hydrogen, oxygen, nitrogen, and carbon], and dissolved noble gases also were measured to help identify the sources and ages of the sampled ground water. In total, over 250 constituents and water-quality indicators were investigated. Quality-control samples (blanks, replicates, and samples for matrix spikes) were collected at approximately one-sixth of the wells, and

  1. Ground-Water Quality Data in the Coachella Valley Study Unit, 2007: Results from the California GAMA Program

    Science.gov (United States)

    Goldrath, Dara A.; Wright, Michael T.; Belitz, Kenneth

    2009-01-01

    Ground-water quality in the approximately 820 square-mile Coachella Valley Study Unit (COA) was investigated during February and March 2007 as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The GAMA Priority Basin Project was developed in response to the Groundwater Quality Monitoring Act of 2001, and is being conducted by the U.S. Geological Survey (USGS) in cooperation with the California State Water Resources Control Board (SWRCB). The study was designed to provide a spatially unbiased assessment of raw ground water used for public-water supplies within the Coachella Valley, and to facilitate statistically consistent comparisons of ground-water quality throughout California. Samples were collected from 35 wells in Riverside County. Nineteen of the wells were selected using a spatially distributed, randomized grid-based method to provide statistical representation of the study unit (grid wells). Sixteen additional wells were sampled to evaluate changes in water chemistry along selected ground-water flow paths, examine land use effects on ground-water quality, and to collect water-quality data in areas where little exists. These wells were referred to as 'understanding wells'. The ground-water samples were analyzed for a large number of organic constituents (volatile organic compounds [VOC], pesticides and pesticide degradates, pharmaceutical compounds, and potential wastewater-indicator compounds), constituents of special interest (perchlorate and 1,2,3-trichloropropane [1,2,3-TCP]), naturally occurring inorganic constituents (nutrients, major and minor ions, and trace elements), radioactive constituents, and microbial indicators. Naturally occurring isotopes (uranium, tritium, carbon-14, and stable isotopes of hydrogen, oxygen, and boron), and dissolved noble gases (the last in collaboration with Lawrence Livermore National Laboratory) also were measured to help identify the source and age of the sampled

  2. 40 CFR 141.403 - Treatment technique requirements for ground water systems.

    Science.gov (United States)

    2010-07-01

    ... ground water systems. 141.403 Section 141.403 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Ground Water Rule § 141... customer as follows: (i) Chemical disinfection—(A) Ground water systems serving greater than 3,300 people...

  3. Ionosphere Delay Calibration and Calibration Errors for Satellite Navigation of Aircraft

    Science.gov (United States)

    Harris, Ian; Manucci, Anthony; Iijima, Byron; Lindqwister, Ulf; Muna, Demitri; Pi, Xiaoqing; Wilson, Brian

    2000-01-01

    The Federal Aviation Administration (FAA) is implementing a satellite-based navigation system for aircraft using the Global Positioning System (GPS). Positioning accuracy of a few meters will be achieved by broadcasting corrections to the direct GPS signal. These corrections are derived using the wide-area augmentation system (WAAS), which includes a ground network of at least 24 GPS receivers across the Continental US (CONUS). WAAS will provide real-time total electron content (TEC) measurements that can be mapped to fixed grid points using a real-time mapping algorithm. These TECs will be converted into vertical delay corrections for the GPS L1 frequency and broadcast to users every five minutes via geosynchronous satellite. Users will convert these delays to slant calibrations along their own lines-of-sight (LOS) to GPS satellites. Uncertainties in the delay calibrations will also be broadcast, allowing users to estimate the uncertainty of their position. To maintain user safety without reverting to excessive safety margins an empirical model of user calibration errors has been developed. WAAS performance depends on factors that include geographic location (errors increase near WAAS borders), and ionospheric conditions, such as the enhanced spatial electron density gradients found during ionospheric storms.

  4. The effectiveness of parent participation in occupational therapy for children with developmental delay

    Directory of Open Access Journals (Sweden)

    Lin CL

    2018-02-01

    Full Text Available Chien-Lin Lin1,2 Chin-Kai Lin,3 Jia-Jhen Yu4 1Department of Physical Medicine and Rehabilitation, China Medical University Hospital, 2School of Chinese Medicine, College of Chinese Medicine, China Medical University, 3Program of Early Intervention, Department of Early Childhood Education, National Taichung University of Education, 4Occupation Therapy Unit of Rehabilitation Techniques Section, Lin Shin Medical Corporation Wuri Lin Shin Hospital, Taichung, Taiwan Introduction: This study aims to explore the impact of Parent Participation Program on the development of developmental delay children. Methods: Pretest-posttest equivalent-group experimental design study was used in this paper. A total of 30 pairs of developmental delay children aged 0–72 months and their parents participated into this study. They were divided into two groups, namely control group and experimental group, according to parents’ wishes. The objects of study in control group received 16 courses of direct rehabilitation therapy; those in experimental group received 8 courses of direct rehabilitation therapy and 8 courses of instruction and tracking of Parent Participation Program. The duration of the intervention was 8 weeks. All cases should be evaluated before and after the intervention, to analyze the difference before and after intervention and among groups. The statistical methods in this paper included descriptive analysis, Chi-square test, independent sample t-test, pair-sample t-test. Results and conclusion: The intervention of Parent Participation Occupational Program has positive impact on the development of developmental delay children in various fields. Among all the intervention results, the progress of the experimental group is 1.895 times more than that of the control group. With parent involvement, Parent Participation Occupational Therapy can promote the cognitive ability, language ability, action ability (gross and fine movement, social competence and

  5. Delayed fission

    Energy Technology Data Exchange (ETDEWEB)

    Hatsukawa, Yuichi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1997-07-01

    Delayed fission is a nuclear decay process that couples {beta} decay and fission. In the delayed fission process, a parent nucleus undergoes {beta} decay and thereby populates excited states in the daughter. If these states are of energies comparable to or greater than the fission barrier of the daughter, then fission may compete with other decay modes of the excited states in the daughter. In this paper, mechanism and some experiments of the delayed fission will be discussed. (author)

  6. POLICY FRAMEWORK FOR UTILIZATION AND CONSERVATION OF BELOW-GROUND BIODIVERSITY IN KENYA

    Directory of Open Access Journals (Sweden)

    Celline Achieng

    2009-10-01

    Full Text Available The reasons for the lack of inclusion of below-ground biodiversity in the Kenyan policy and legal framework were sought. Gaps were identified in the relevant sectoral policies and laws in regard to the domestication of the Convention on Biological Diversity (CBD. Below -ground biodiversity had no specific schedule in any of the sectoral laws. Most sectoral laws were particular about the larger biodiversity and soils but had no mention of below-ground biodiversity. Material Transfer Agreements and Material Acquisition Agreements that are regarded as tools of domestication of the CBD to guide transfers, exchanges and acquisition of soil organisms lacked a regulating policy. The lack of regulating policy could be attributed to the delay in approval of draft regulations by the Ministry of Environment while the lack of inclusion of below-ground biodiversity in Kenya’s legal and policy framework could be as a result of lack of awareness and appreciation among stakeholders.

  7. Estimating the cost of delaying a nuclear power plant: methodology and application

    International Nuclear Information System (INIS)

    Hill, L.J.; Tepel, R.C.; Van Dyke, J.W.

    1985-01-01

    This paper presents an analysis of an actual 24-month nuclear power plant licensing delay under alternate assumptions about regulatory practice, sources of replacement power, and the cost of the plant. The analysis focuses on both the delay period and periods subsequent to the delay. The methodology utilized to simulate the impacts involved the recursive interaction of a generation-costing program to estimate fuel-replacement costs and a financial regulatory model to concomitantly determine the impact on the utility, its ratepayers, and security issues. The results indicate that a licensing delay has an adverse impact on the utility's internal generation of funds and financial indicators used to evaluate financial soundness. The direction of impact on electricity rates is contingent on the source of fuel used for replacement power. 5 references, 5 tables

  8. Ground-water monitoring and modeling at the Hanford Site

    International Nuclear Information System (INIS)

    Mitchell, P.J.; Freshley, M.D.

    1987-01-01

    The ground-water monitoring program at the Hanford Site in southeastern Washington State is continually evolving in response to changing operations at the site, changes in the ground-water flow system, movement of the constituents in the aquifers, and regulatory requirements. Sampling and analysis of ground water, along with ground-water flow and solute transport modeling are used to evaluate the movement and resulting distributions of radionuclides and hazardous chemical constituents in the unconfined aquifer. Evaluation of monitoring results, modeling, and information on waste management practices are being combined to continually improve the network of ground-water monitoring wells at the site

  9. Ground-water monitoring and modeling at the Hanford Site

    International Nuclear Information System (INIS)

    Mitchell, P.J.; Freshley, M.D.

    1987-01-01

    The ground-water monitoring program at the Hanford Site in southeastern Washington State is continually evolving in response to changing operations at the site, changes in the ground-water flow system, movement of the constituents in the aquifers, and regulatory requirements. Sampling and analysis of ground water, along with ground-water flow and solute transport modeling are used ito evaluate the movement and resulting distributions of radionuclides and hazardous chemical constituents in the unconfined aquifer. Evaluation of monitoring results, modeling, and information on waste management practices are being combined to continually improve the network of ground-water monitoring wells at the site

  10. On the Pontryagin maximum principle for systems with delays. Economic applications

    Science.gov (United States)

    Kim, A. V.; Kormyshev, V. M.; Kwon, O. B.; Mukhametshin, E. R.

    2017-11-01

    The Pontryagin maximum principle [6] is the key stone of finite-dimensional optimal control theory [1, 2, 5]. So beginning with opening the maximum principle it was important to extend the maximum principle on various classes of dynamical systems. In t he paper we consider some aspects of application of i-smooth analysis [3, 4] in the theory of the Pontryagin maximum principle [6] for systems with delays, obtained results can be applied by elaborating optimal program controls in economic models with delays.

  11. 78 FR 44054 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program; Proposed Delay of...

    Science.gov (United States)

    2013-07-23

    ... delay the effective date of the 2011 Wage Rule to avoid the replacement of the wage provisions of the H... appropriated funds to implement, administer, or enforce the 2011 Wage Rule, the Department proposes to delay... subject of the 2011 Wage Rule, require the indefinite delay of the effective date of the 2011 Wage Rule...

  12. Adding Theoretical Grounding to Grounded Theory: Toward Multi-Grounded Theory

    OpenAIRE

    Göran Goldkuhl; Stefan Cronholm

    2010-01-01

    The purpose of this paper is to challenge some of the cornerstones of the grounded theory approach and propose an extended and alternative approach for data analysis and theory development, which the authors call multi-grounded theory (MGT). A multi-grounded theory is not only empirically grounded; it is also grounded in other ways. Three different grounding processes are acknowledged: theoretical, empirical, and internal grounding. The authors go beyond the pure inductivist approach in GT an...

  13. Sampling art for ground-water monitoring wells in nuclide migration

    International Nuclear Information System (INIS)

    Liu Wenyuan; Tu Guorong; Dang Haijun; Wang Xuhui; Ke Changfeng

    2010-01-01

    Ground-Water sampling is one of the key parts in field nuclide migration. The objective of ground-water sampling program is to obtain samples that are representative of formation-quality water. In this paper, the ground-water sampling standards and the developments of sampling devices are reviewed. We also designed the sampling study projects which include the sampling methods, sampling parameters and the elementary devise of two types of ground-Water sampling devices. (authors)

  14. Fuzzy delay model based fault simulator for crosstalk delay fault test ...

    Indian Academy of Sciences (India)

    In this paper, a fuzzy delay model based crosstalk delay fault simulator is proposed. As design .... To find the quality of non-robust tests, a fuzzy delay ..... Dubois D and Prade H 1989 Processing Fuzzy temporal knowledge. IEEE Transactions ...

  15. Piecing together the maternal death puzzle through narratives: the three delays model revisited.

    Directory of Open Access Journals (Sweden)

    Viva Combs Thorsen

    Full Text Available BACKGROUND: In Malawi maternal mortality continues to be a major public health challenge. Going beyond the numbers to form a more complete view of why women die is critical to improving access to and quality of emergency obstetric care. The objective of the current study was to identify the socio-cultural and facility-based factors that contributed to maternal deaths in the district of Lilongwe, Malawi. METHODS: Retrospectively, 32 maternal death cases that occurred between January 1, 2011 and June 30, 2011 were reviewed independently by two gynecologists/obstetricians. Interviews were conducted with healthcare staff, family members, neighbors, and traditional birth attendants. Guided by the grounded theory approach, interview transcripts were analyzed manually and continuously. Emerging, recurring themes were identified and excerpts from the transcripts were categorized according to the Three Delays Model (3Ds. RESULTS: Sixteen deaths were due to direct obstetric complications, sepsis and hemorrhage being most common. Sixteen deaths were due to indirect causes with the main cause being anemia, followed by HIV and heart disease. Lack of recognizing signs, symptoms, and severity of the situation; using traditional Birth Attendant services; low female literacy level; delayed access to transport; hardship of long distance and physical terrain; delayed prompt quality emergency obstetric care; and delayed care while at the hospital due to patient refusal or concealment were observed. According to the 3Ds, the most common delay observed was in receiving treatment upon reaching the facility due to referral delays, missed diagnoses, lack of blood, lack of drugs, or inadequate care, and severe mismanagement.

  16. Delayed power analysis

    International Nuclear Information System (INIS)

    Adamovich, L.A.; Azarov, V.V.

    1999-01-01

    Time dependent core power behavior in a nuclear reactor is described with well-known neutron kinetics equations. At the same time, two portions are distinguished in energy released from uranium nuclei fission; one released directly at fission and another delayed (residual) portion produced during radioactive decay of fission products. While prompt power is definitely described with kinetics equations, the delayed power presentation still remains outstanding. Since in operation the delayed power part is relatively small (about 6%) operation, it can be neglected for small reactivity disturbances assuming that entire power obeys neutron kinetics equations. In case of a high negative reactivity rapidly inserted in core (e.g. reactor scram initiation) the prompt and delayed components can be calculated separately with practically no impact on each other, employing kinetics equations for prompt power and known approximation formulas for delayed portion, named residual in this specific case. Under substantial disturbances the prompt component in the dynamic process becomes commensurable with delayed portion, thus making necessary to take into account their cross impact. A system of differential equations to describe time-dependent behavior of delayed power is presented. Specific NPP analysis shows a way to significantly simplify the task formulation. (author)

  17. NRC Task Force report on review of the federal/state program for regulation of commercial low-level radioactive waste burial grounds

    International Nuclear Information System (INIS)

    1977-01-01

    The underlying issue explored in this report is that of Federal vs State regulation of commercial radioactive waste burial grounds. The need for research and development, a comprehensive set of standards and criteria, a national plan for low-level waste management, and perpetual care funding are closely related to the central issue and are also discussed. Five of the six commercial burial grounds are regulated by Agreement States; the sixth is regulated solely by the NRC (NRC also regulates Special Nuclear Material at the sites). The sites are operated commercially. The operators contribute to the perpetual care funds for the sites at varying rates. The States have commitments for the perpetual care of the decommissioned sites except for one site, located on Federally owned land. Three conclusions are reached. Federal control over the disposal of low-level waste should be increased by requiring joint Federal/State site approval, NRC licensing, Federal ownership of the land, and a Federally administered perpetual care program. The NRC should accelerate the development of its regulatory program for the disposal of low-level waste. The undisciplined proliferation of low-level burial sites must be avoided. NRC should evaluate alternative disposal methods, conduct necessary studies, and develop a comprehensive low-level waste regulatory program (i.e., accomplish the above recommendations) prior to the licensing of new disposal sites

  18. Beta-delayed proton emission in neutron-deficient lanthanide isotopes

    International Nuclear Information System (INIS)

    Wilmarth, P.A.

    1988-01-01

    Forty-two β-delayed proton precursors with 56≤Z≤71 and 63≤N≤83 were produced in heavy-ion reactions at the Lawrence Berkeley Laboratory SuperHILAC and their radioactive decay properties studied at the on-line mass separation facility OASIS. Twenty-five isotopes and eight delayed proton branches were identified for the first time. Delayed proton energy spectra and proton coincident γ-ray and x-ray spectra were measured for all precursors. In a few cases, proton branching ratios were also determined. The precursor mass numbers were determined by the separator, while the proton coincident x-ray energies provided unambiguous Z identifications. The proton coincident γ-ray intensities were used to extract final state branching ratios. Proton emission from ground and isomeric states was observed in many cases. The majority of the delayed proton spectra exhibited the smooth bell-shaped distribution expected for heavy mass precursors. The experimental results were compared to statistical model calculations using standard parameter sets. Calculations using Nilsson model/RPA β-strength functions were found to reproduce the spectral shapes and branching ratios better than calculations using either constant or gross theory β-strength functions. Precursor half-life predictions from the Nilsson model/RPA β-strength functions were also in better agreement with the measured half-lives than were gross theory predictions. The ratios of positron coincident proton intensities to total proton intensities were used to determine Q/sub EC/-B/sub p/ values for several precursors near N=82. The statistical model calculations were not able to reproduce the experimental results for N=81 precursors. 154 refs., 82 figs., 19 tabs

  19. 48 CFR 22.1014 - Delay over 60 days in bid opening or commencement of work.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Delay over 60 days in bid... ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Service Contract Act of 1965, as Amended 22.1014 Delay over 60 days in bid opening or commencement of work. If a...

  20. Ose evaluation of delay systems in a high threat environment

    International Nuclear Information System (INIS)

    Rich, B.L.; Cook, B.G.

    1988-01-01

    The Office of Security Evaluations (OSE) has in place an Evaluation Program to assist the Department of Energy (DOE) Headquarters and operations office managers by assessing specific elements of protection programs and informing the managers of common strengths and weaknesses of these elements. This information is provided so that sufficient and cost effective protection programs are maintained or enhanced. The subject of this paper is the evaluation of delay systems in the high-threat environment defined for sensitive DOE security interests such as special nuclear materials, nuclear weapons, and related classified devices and information

  1. Patient Delay, Diagnosis Delay and Treatment Delay for Breast Cancer: Comparison of the Pattern between Patients in Public and Private Health Sectors

    Directory of Open Access Journals (Sweden)

    Iraj Harirchi

    2015-05-01

    Full Text Available Background: The purpose of this study was to compare patient delay, diagnosis delay and treatment delay in breast cancer patients of selected public and private health centers in Tehran, Iran.Methods: In this cross-sectional study, female patients with newly diagnosed breast cancer in a public medical complex and a private breast clinic within one year were included. Patient delay was considered positive, if the interval between the detection of the first symptom by the patient and the first visit to a health care provider took longer than one month. Delay in diagnosis was defined as the period of more than one week between the first medical visit for the symptoms and the diagnosis of breast cancer. Following the confirmed diagnosis of breast malignancy, if the medical treatment was initiated later than one week, treatment delay had occurred. The potential reasons for patient, diagnosis and treatment delay according to the patients’ reports were also recorded.Results: Overall, 385 patients were included of whom 52.7% were recruited from the public hospitals and 47.3% from a private clinic. The prevalence of patient delay, diagnosis delay and treatment delay were 31.7%, 17.9% and 28.3%, respectively. Patient delay was significantly more common among patients with lower socio-economic status and those recruited from the public hospitals. All the patients with diagnosis delay were in the group recruited from the public hospitals.Conclusions: Gaps between women of different socio-economic levels of the society need to be addressed in order to decrease patient, diagnosis and treatment delay.

  2. Speech and Language Delay

    Science.gov (United States)

    ... OTC Relief for Diarrhea Home Diseases and Conditions Speech and Language Delay Condition Speech and Language Delay Share Print Table of Contents1. ... Treatment6. Everyday Life7. Questions8. Resources What is a speech and language delay? A speech and language delay ...

  3. Hydrogeology of the 200 Areas low-level burial grounds

    International Nuclear Information System (INIS)

    Last, G.V.; Bjornstad, B.N.; Bergeron, M.P.

    1989-01-01

    This report presents information derived from the installation of 35 ground-water monitoring wells around six low-level radioactive/hazardous waste burial grounds located in the 200 Areas of the Hanford Site in southeastern Washington State. This information was collected between May 20, 1987 and August 1, 1988. The contents of this report have been divided into two volumes. This volume contains the main text. Volume 2 contains the appendixes, including data and supporting information that verify content and results found in the main text. This report documents information collected by the Pacific Northwest Laboratory at the request of Westinghouse Hanford Company. Presented in this report are the preliminary interpretations of the hydrogeologic environment of six low-level burial grounds, which comprise four waste management areas (WMAs) located in the 200 Areas of the Hanford Site. This information and its accompanying interpretations were derived from sampling and testing activities associated with the construction of 35 ground-water monitoring wells as well as a multitude of previously existing boreholes. The new monitoring wells were installed as part of a ground-water monitoring program initiated in 1986. This ground-water monitoring program is based on requirements for interim status facilities in compliance with the Resource Conservation and Recovery Act (1976)

  4. Creating Space Plasma from the Ground

    Science.gov (United States)

    2016-05-12

    AFRL-AFOSR-VA-TR-2016-0179 CREATING SPACE PLASMA FROM THE GROUND Herbert C Carlson UTAH STATE UNIVERSITY Final Report 05/12/2016 DISTRIBUTION A...DATE (DD-MM-YYYY) 05/14/2016 2. REPORT TYPE Final 3. DATES COVERED (From - To) 08/14/2012-05/14/2016 4. TITLE AND SUBTITLE Creating space plasma from...Report (2016) Creating Space Plasma from the Ground Grant FA9550-11-1-0236 AFOSR Program Manager Dr. Kent Miller PI: Herbert C. Carlson Center for

  5. Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions

    International Nuclear Information System (INIS)

    1993-01-01

    This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake's ground motion is a function of the earthquake's magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is a stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. This document, Volume II, contains Appendices 2, 3, 5, 6, and 7 covering the following topics: Eastern North American Empirical Ground Motion Data; Examination of Variance of Seismographic Network Data; Soil Amplification and Vertical-to-Horizontal Ratios from Analysis of Strong Motion Data From Active Tectonic Regions; Revision and Calibration of Ou and Herrmann Method; Generalized Ray Procedure for Modeling Ground Motion Attenuation; Crustal Models for Velocity Regionalization; Depth Distribution Models; Development of Generic Site Effects Model; Validation and Comparison of One-Dimensional Site Response Methodologies; Plots of Amplification Factors; Assessment of Coupling Between Vertical ampersand Horizontal Motions in Nonlinear Site Response Analysis; and Modeling of Dynamic Soil Properties

  6. Piloted simulator study of allowable time delays in large-airplane response

    Science.gov (United States)

    Grantham, William D.; Bert T.?aetingas, Stephen A.dings with ran; Bert T.?aetingas, Stephen A.dings with ran

    1987-01-01

    A piloted simulation was performed to determine the permissible time delay and phase shift in the flight control system of a specific large transport-type airplane. The study was conducted with a six degree of freedom ground-based simulator and a math model similar to an advanced wide-body jet transport. Time delays in discrete and lagged form were incorporated into the longitudinal, lateral, and directional control systems of the airplane. Three experienced pilots flew simulated approaches and landings with random localizer and glide slope offsets during instrument tracking as their principal evaluation task. Results of the present study suggest a level 1 (satisfactory) handling qualities limit for the effective time delay of 0.15 sec in both the pitch and roll axes, as opposed to a 0.10-sec limit of the present specification (MIL-F-8785C) for both axes. Also, the present results suggest a level 2 (acceptable but unsatisfactory) handling qualities limit for an effective time delay of 0.82 sec and 0.57 sec for the pitch and roll axes, respectively, as opposed to 0.20 sec of the present specifications for both axes. In the area of phase shift between cockpit input and control surface deflection,the results of this study, flown in turbulent air, suggest less severe phase shift limitations for the approach and landing task-approximately 50 deg. in pitch and 40 deg. in roll - as opposed to 15 deg. of the present specifications for both axes.

  7. Development of methodology and computer programs for the ground response spectrum and the probabilistic seismic hazard analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Joon Kyoung [Semyung Univ., Research Institute of Industrial Science and Technol , Jecheon (Korea, Republic of)

    1996-12-15

    Objective of this study is to investigate and develop the methodologies and corresponding computer codes, compatible to the domestic seismological and geological environments, for estimating ground response spectrum and probabilistic seismic hazard. Using the PSHA computer program, the Cumulative Probability Functions(CPDF) and Probability Functions (PDF) of the annual exceedence have been investigated for the analysis of the uncertainty space of the annual probability at ten interested seismic hazard levels (0.1 g to 0.99 g). The cumulative provability functions and provability functions of the annual exceedence have been also compared to those results from the different input parameter spaces.

  8. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  9. Delay discounting, self-control, and substance use among adult drug court participants.

    Science.gov (United States)

    Jones, Craig G A; Fearnley, Helen; Panagiotopoulos, Barbara; Kemp, Richard I

    2015-08-01

    The current study examined the relationship between two measures of impulsiveness and the odds of substance use among a sample of participants on an Australian drug court (n=80). Participants completed a computer-based delay discounting task, a paper-based delay discounting task, and a questionnaire-based measure of self-control. The delay discounting tasks measured individual differences in the value attributed to distal outcomes, which is one aspect of impulsive behavior that has been found to be over-represented among illicit drug users. The relationship between the measures of impulsiveness and the odds of substance use was assessed by fitting longitudinal panel regression models with adjustment for informative treatment dropout. Consistent with previous research, drug court participants were found to have higher discount rates (i.e. were more impulsive) than a noncriminal population of university students (n=101). Drug court participants also discounted delayed gains more than delayed losses. Delay discounting was not significantly associated with the odds of substance use on the drug court program. There was a positive relationship between the survey-based measure of impulsivity and the mean substance use frequency. The authors conclude that impulsivity is correlated with substance use among drug court participants but not when measuring impulsivity using a delay discounting paradigm.

  10. Fusion cross sections from measurements of delayed X-rays

    International Nuclear Information System (INIS)

    Pacheco, A.J.; Gregorio, D.E. di; Fernandez Niello, J.O; Elgue, M.

    1988-01-01

    The program XRAY is a FORTRAN 77 computer code for the extraction of fusion cross sections from delayed X-ray measurements. This is accomplished by calculating the theoretical expressions of the time dependence of the evaporation-residue cross sections and taking them as adjustable parameters in a χ 2 minimization procedure. (orig.)

  11. Synchronization of delayed systems in the presence of delay time modulation

    International Nuclear Information System (INIS)

    Kye, Won-Ho; Choi, Muhan; Kim, Myung-Woon; Lee, Soo-Young; Rim, Sunghwan; Kim, Chil-Min; Park, Young-Jai

    2004-01-01

    We investigate synchronization in the presence of delay time modulation for application to communication. We have observed that the robust synchronization is established by a common delay signal and its threshold is presented using Lyapunov exponents analysis. The influence of the delay time modulation in chaotic oscillators is also discussed

  12. Real-time pulse deinterleaving using digital delay line techniques

    Science.gov (United States)

    Lentz, L. F.; Palermo, T. J.

    This paper describes an implementation of a tracking pulse sorter based on predictive gating techniques. Real-time pulse sorters or pulse train gating devices have been utilized by the ELINT signal analyst for many years. The more elementary of these devices employed a retriggerable delay interval and an acceptance gate, which were used in predictive fashion to track pulse trains whose PRIs fall within the limits of the programmed delay interval. This design utilizes the pulse hit/miss history of individual track files in a variation of a sequential observer detection algorithm. Use of a digital delay line with pulse history allows multiple pulse trains to be tracked simultaneously and independently without interference. The design also provides flexibility in lock-on and track criteria to allow maintenance of acquisition probability and false alarm rate in dense signal environments and with low SNRs. The hardware provides time interval resolution to 12.5 nsec and covers a PRI range of 50 microsec to 50 msec.

  13. NOAA's Joint Polar Satellite System's (JPSS) Proving Ground and Risk Reduction (PGRR) Program - Bringing JPSS Science into Support of Key NOAA Missions!

    Science.gov (United States)

    Sjoberg, W.; McWilliams, G.

    2017-12-01

    This presentation will focus on the continuity of the NOAA Joint Polar Satellite System (JPSS) Program's Proving Ground and Risk Reduction (PGRR) and key activities of the PGRR Initiatives. The PGRR Program was established in 2012, following the launch of the Suomi National Polar Partnership (SNPP) satellite. The JPSS Program Office has used two PGRR Project Proposals to establish an effective approach to managing its science and algorithm teams in order to focus on key NOAA missions. The presenter will provide details of the Initiatives and the processes used by the initiatives that have proven so successful. Details of the new 2017 PGRR Call-for-Proposals and the status of project selections will be discussed.

  14. Delayed clarification: information, clarification and ethical decisions in critical care in Norway.

    Science.gov (United States)

    Bunch, E H

    2000-12-01

    Following the analysis of about 150 hours of field observation on a critical care unit in Norway a theory was generated to explain the actual ethical decision-making process. This was grounded in the empirical reality of physicians, nurses and family. The core theme in this study was a delayed clarification in assessing the prognosis of accident victims with neurosurgical traumas. The physicians, nurses and family had to wait for the clinical picture to clarify, during which time there was an exchange and emergence of information. Exchanging information, a subprocess to delayed clarification, involved a continuous flow of collecting and dispersing information about the clinical status of the patient. The nurses engaged in two useful strategies: grading information to family when the patient prognosis was poor, and providing grieving strategies for themselves, colleagues and family members. The core variable, delayed clarification has three dimensions: clinical, psychological and ethical. The nurses participated in the decision-making process to discontinue treatment as passive participants, they did not engage in collegial deliberations with the physicians. Ethical dilemmas were end of life questions, resource allocations, and questions of justice and organ transplants.

  15. Soft Computing Approach to Evaluate and Predict Blast-Induced Ground Vibration

    Science.gov (United States)

    Khandelwal, Manoj

    2010-05-01

    Drilling and blasting is still one of the major economical operations to excavate a rock mass. The consumption of explosive has been increased many folds in recent years. These explosives are mainly used for the exploitation of minerals in mining industry or the removal of undesirable rockmass for community development. The amount of chemical energy converted into mechanical energy to fragment and displace the rockmass is minimal. Only 20 to 30% of this explosive energy is utilized for the actual fragmentation and displacement of rockmass and rest of the energy is wasted in undesirable ill effects, like, ground vibration, air over pressure, fly rock, back break, noise, etc. Ground vibration induced due to blasting is very crucial and critical as compared to other ill effects due to involvement of public residing in the close vicinity of mining sites, regulating and ground vibration standards setting agencies together with mine owners and environmentalists and ecologists. Also, with the emphasis shifting towards eco-friendly, sustainable and geo-environmental activities, the field of ground vibration have now become an important and imperative parameter for safe and smooth running of any mining and civil project. The ground vibration is a wave motion, spreading outward from the blast like ripples spreading outwards due to impact of a stone dropped into a pond of water. As the vibration passes through the surface structures, it induces vibrations in those structures also. Sometimes, due to high ground vibration level, dwellings may get damaged and there is always confrontation between mine management and the people residing in the surroundings of the mine area. There is number of vibration predictors available suggested by different researchers. All the predictors estimate the PPV based on mainly two parameters (maximum charge used per delay and distance between blast face to monitoring point). However, few predictors considered attenuation/damping factor too. For

  16. Ground-water quality assessment of the central Oklahoma Aquifer, Oklahoma; project description

    Science.gov (United States)

    Christenson, S.C.; Parkhurst, D.L.

    1987-01-01

    In April 1986, the U.S. Geological Survey began a pilot program to assess the quality of the Nation's surface-water and ground-water resources. The program, known as the National Water-Quality Assessment (NAWQA) program, is designed to acquire and interpret information about a variety of water-quality issues. The Central Oklahoma aquifer project is one of three ground-water pilot projects that have been started. The NAWQA program also incudes four surface-water pilot projects. The Central Oklahoma aquifer project, as part of the pilot NAWQA program, will develop and test methods for performing assessments of ground-water quality. The objectives of the Central Oklahoma aquifer assessment are: (1) To investigate regional ground-water quality throughout the aquifer in the manner consistent with the other pilot ground-water projects, emphasizing the occurrence and distribution of potentially toxic substances in ground water, including trace elements, organic compounds, and radioactive constituents; (2) to describe relations between ground-water quality, land use, hydrogeology, and other pertinent factors; and (3) to provide a general description of the location, nature, and possible causes of selected prevalent water-quality problems within the study unit; and (4) to describe the potential for water-quality degradation of ground-water zones within the study unit. The Central Oklahoma aquifer, which includes in descending order the Garber Sandstone and Wellington Formation, the Chase Group, the Council Grove Group, the Admire Group, and overlying alluvium and terrace deposits, underlies about 3,000 square miles of central Oklahoma and is used extensively for municipal, industrial, commercial, and domestic water supplies. The aquifer was selected for study by the NAWQA program because it is a major source for water supplies in central Oklahoma and because it has several known or suspected water-quality problems. Known problems include concentrations of arsenic, chromium

  17. Study of $\\beta$-delayed neutron decay of $^{8}$He

    CERN Multimedia

    The goal of the present proposal is to study $\\beta$-delayed neutron decay branch of $^{8}$He. The energy spectra of the emitted neutrons will be measured in the energy range of 0.1 – 6 MeV using the VANDLE spectrometer. Using coincident $\\gamma$-ray measurement, components of the spectrum corresponding to transitions to the ground- and first- excited states of $^{7}$Li will be disentangled. The new data will allow us to get a more complete picture of the $\\beta$-decay of $^{8}$He and to clarify the discrepancy between the B(GT) distributions derived from the $\\beta$-decay and $^{8}$He(p, n)$^{8}$Li reaction studies.

  18. 4-channel rad-hard delay generation ASIC with 1ns timing resolution for LHC

    International Nuclear Information System (INIS)

    Toifl, T.; Moreira, P.; Marchioro, A.; Vari, R.

    1999-01-01

    An ASIC was developed to precisely delay digital signals within the range of 0--24ns in steps of 1ns. To obtain well defined delay values independent of variations in process, supply voltage and temperature, four independent delay channels are controlled by a common control voltage derived from a delay-locked loop (DLL), which is synchronized to an external 40 MHz clock signal. The delay values of the four signal channels and the clock channel can be individually programmed via an I 2 C interface. Due to an automatic reset logic the chip does not need an external reset signal. A first version of the chip was developed in a non-rad-hard 0.8 microm technology and the successful prototype was then transferred to a radiation hard process (DMILL). Measurement results for both chip variants will be presented

  19. Chaos synchronization in time-delayed systems with parameter mismatches and variable delay times

    International Nuclear Information System (INIS)

    Shahverdiev, E.M.; Nuriev, R.A.; Hashimov, R.H.; Shore, K.A.

    2004-06-01

    We investigate synchronization between two undirectionally linearly coupled chaotic nonidentical time-delayed systems and show that parameter mismatches are of crucial importance to achieve synchronization. We establish that independent of the relation between the delay time in the coupled systems and the coupling delay time, only retarded synchronization with the coupling delay time is obtained. We show that with parameter mismatch or without it neither complete nor anticipating synchronization occurs. We derive existence and stability conditions for the retarded synchronization manifold. We demonstrate our approach using examples of the Ikeda and Mackey Glass models. Also for the first time we investigate chaos synchronization in time-delayed systems with variable delay time and find both existence and sufficient stability conditions for the retarded synchronization manifold with the coupling-delay lag time. (author)

  20. 77 FR 60040 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program; Delay of Effective Date

    Science.gov (United States)

    2012-10-02

    ...: Employment and Training Administration, Labor. ACTION: Final rule; delay of effective date. SUMMARY: The... necessary in light of the November Appropriations Act to delay the effective date of the Wage Rule in order..., Sec. 101(a), the Department must again delay the effective date of the Wage Rule to prevent the...

  1. Ground-Water Quality Data in the Kern County Subbasin Study Unit, 2006 - Results from the California GAMA Program

    Science.gov (United States)

    Shelton, Jennifer L.; Pimentel, Isabel; Fram, Miranda S.; Belitz, Kenneth

    2008-01-01

    Ground-water quality in the approximately 3,000 square-mile Kern County Subbasin study unit (KERN) was investigated from January to March, 2006, as part of the Priority Basin Assessment Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The GAMA Priority Basin Assessment project was developed in response to the Groundwater Quality Monitoring Act of 2001, and is being conducted by the California State Water Resources Control Board (SWRCB) in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory (LLNL). The Kern County Subbasin study was designed to provide a spatially unbiased assessment of raw (untreated) ground-water quality within KERN, as well as a statistically consistent basis for comparing water quality throughout California. Samples were collected from 50 wells within the San Joaquin Valley portion of Kern County. Forty-seven of the wells were selected using a randomized grid-based method to provide a statistical representation of the ground-water resources within the study unit. Three additional wells were sampled to aid in the evaluation of changes in water chemistry along regional ground-water flow paths. The ground-water samples were analyzed for a large number of man-made organic constituents (volatile organic compounds [VOCs], pesticides, and pesticide degradates), constituents of special interest (perchlorate, N-nitrosodimethylamine [NDMA], and 1,2,3-trichloropropane [1,2,3-TCP]), naturally occurring inorganic constituents (nutrients, major and minor ions, and trace elements), radioactive constituents, and microbial indicators. Naturally occurring isotopes (tritium, carbon-14, and stable isotopes of hydrogen, oxygen, nitrogen, and carbon) and dissolved noble gases also were measured to help identify the source and age of the sampled ground water. Quality-control samples (blanks, replicates, and laboratory matrix spikes) were collected and analyzed at approximately 10 percent of

  2. Ground-Water Quality Data in the Middle Sacramento Valley Study Unit, 2006 - Results from the California GAMA Program

    Science.gov (United States)

    Schmitt, Stephen J.; Fram, Miranda S.; Milby Dawson, Barbara J.; Belitz, Kenneth

    2008-01-01

    Ground-water quality in the approximately 3,340 square mile Middle Sacramento Valley study unit (MSACV) was investigated from June through September, 2006, as part of the California Groundwater Ambient Monitoring and Assessment (GAMA) program. The GAMA Priority Basin Assessment project was developed in response to the Groundwater Quality Monitoring Act of 2001 and is being conducted by the U.S. Geological Survey (USGS) in cooperation with the California State Water Resources Control Board (SWRCB). The Middle Sacramento Valley study was designed to provide a spatially unbiased assessment of raw ground-water quality within MSACV, as well as a statistically consistent basis for comparing water quality throughout California. Samples were collected from 108 wells in Butte, Colusa, Glenn, Sutter, Tehama, Yolo, and Yuba Counties. Seventy-one wells were selected using a randomized grid-based method to provide statistical representation of the study unit (grid wells), 15 wells were selected to evaluate changes in water chemistry along ground-water flow paths (flow-path wells), and 22 were shallow monitoring wells selected to assess the effects of rice agriculture, a major land use in the study unit, on ground-water chemistry (RICE wells). The ground-water samples were analyzed for a large number of synthetic organic constituents (volatile organic compounds [VOCs], gasoline oxygenates and degradates, pesticides and pesticide degradates, and pharmaceutical compounds), constituents of special interest (perchlorate, N-nitrosodimethylamine [NDMA], and 1,2,3-trichloropropane [1,2,3-TCP]), inorganic constituents (nutrients, major and minor ions, and trace elements), radioactive constituents, and microbial indicators. Naturally occurring isotopes (tritium, and carbon-14, and stable isotopes of hydrogen, oxygen, nitrogen, and carbon), and dissolved noble gases also were measured to help identify the sources and ages of the sampled ground water. Quality-control samples (blanks

  3. Florida's ground water quality monitoring program: background hydrogeochemistry

    OpenAIRE

    Maddox, Gary; Upchurch, Sam; Lloyd, Jacqueline; Scott, Tom

    1992-01-01

    The purpose of this report is to present the results of the initial quantification of background water quality in each of the state's major potable aquifer systems. Results are presented and interpreted in light of the influencing factors which locally and regionally affect ambient ground-water quality. This initial data will serve as a baseline from which future sampling results can be compared. Future sampling of the Network will indicate the extent to which Flori...

  4. Statistical precision of delayed-neutron nondestructive assay techniques

    International Nuclear Information System (INIS)

    Bayne, C.K.; McNeany, S.R.

    1979-02-01

    A theoretical analysis of the statistical precision of delayed-neutron nondestructive assay instruments is presented. Such instruments measure the fissile content of nuclear fuel samples by neutron irradiation and delayed-neutron detection. The precision of these techniques is limited by the statistical nature of the nuclear decay process, but the precision can be optimized by proper selection of system operating parameters. Our method is a three-part analysis. We first present differential--difference equations describing the fundamental physics of the measurements. We then derive and present complete analytical solutions to these equations. Final equations governing the expected number and variance of delayed-neutron counts were computer programmed to calculate the relative statistical precision of specific system operating parameters. Our results show that Poisson statistics do not govern the number of counts accumulated in multiple irradiation-count cycles and that, in general, maximum count precision does not correspond with maximum count as first expected. Covariance between the counts of individual cycles must be considered in determining the optimum number of irradiation-count cycles and the optimum irradiation-to-count time ratio. For the assay system in use at ORNL, covariance effects are small, but for systems with short irradiation-to-count transition times, covariance effects force the optimum number of irradiation-count cycles to be half those giving maximum count. We conclude that the equations governing the expected value and variance of delayed-neutron counts have been derived in closed form. These have been computerized and can be used to select optimum operating parameters for delayed-neutron assay devices

  5. Figure-ground segregation can rely on differences in motion direction.

    Science.gov (United States)

    Kandil, Farid I; Fahle, Manfred

    2004-12-01

    If the elements within a figure move synchronously while those in the surround move at a different time, the figure is easily segregated from the surround and thus perceived. Lee and Blake (1999) [Visual form created solely from temporal structure. Science, 284, 1165-1168] demonstrated that this figure-ground separation may be based not only on time differences between motion onsets, but also on the differences between reversals of motion direction. However, Farid and Adelson (2001) [Synchrony does not promote grouping in temporally structured displays. Nature Neuroscience, 4, 875-876] argued that figure-ground segregation in the motion-reversal experiment might have been based on a contrast artefact and concluded that (a)synchrony as such was 'not responsible for the perception of form in these or earlier displays'. Here, we present experiments that avoid contrast artefacts but still produce figure-ground segregation based on purely temporal cues. Our results show that subjects can segregate figure from ground even though being unable to use motion reversals as such. Subjects detect the figure when either (i) motion stops (leading to contrast artefacts), or (ii) motion directions differ between figure and ground. Segregation requires minimum delays of about 15 ms. We argue that whatever the underlying cues and mechanisms, a second stage beyond motion detection is required to globally compare the outputs of local motion detectors and to segregate figure from ground. Since analogous changes take place in both figure and ground in rapid succession, this second stage has to detect the asynchrony with high temporal precision.

  6. Ground-Water Quality Data in the Southern Sacramento Valley, California, 2005 - Results from the California GAMA Program

    Science.gov (United States)

    Milby Dawson, Barbara J.; Bennett, George L.; Belitz, Kenneth

    2008-01-01

    Ground-water quality in the approximately 2,100 square-mile Southern Sacramento Valley study unit (SSACV) was investigated from March to June 2005 as part of the Statewide Basin Assessment Project of Ground-Water Ambient Monitoring and Assessment (GAMA) Program. This study was designed to provide a spatially unbiased assessment of raw ground-water quality within SSACV, as well as a statistically consistent basis for comparing water quality throughout California. Samples were collected from 83 wells in Placer, Sacramento, Solano, Sutter, and Yolo Counties. Sixty-seven of the wells were selected using a randomized grid-based method to provide statistical representation of the study area. Sixteen of the wells were sampled to evaluate changes in water chemistry along ground-water flow paths. Four additional samples were collected at one of the wells to evaluate water-quality changes with depth. The GAMA Statewide Basin Assessment project was developed in response to the Ground-Water Quality Monitoring Act of 2001 and is being conducted by the California State Water Resources Control Board (SWRCB) in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory (LLNL). The ground-water samples were analyzed for a large number of man-made organic constituents (volatile organic compounds [VOCs], pesticides and pesticide degradates, pharmaceutical compounds, and wastewater-indicator constituents), constituents of special interest (perchlorate, N-nitrosodimethylamine [NDMA], and 1,2,3-trichloropropane [1,2,3-TCP]), naturally occurring inorganic constituents (nutrients, major and minor ions, and trace elements), radioactive constituents, and microbial indicators. Naturally occurring isotopes (tritium, and carbon-14, and stable isotopes of hydrogen, oxygen, and carbon), and dissolved noble gases also were measured to help identify the source and age of the sampled ground water. Quality-control samples (blanks, replicates, matrix spikes

  7. Calculation of Grounding Grids Parameter at Arbitrary Geometry

    Directory of Open Access Journals (Sweden)

    Carlos L. B. Silva

    2017-06-01

    Full Text Available This paper deals with the computation of ground resistance, surface voltage, touch voltage and step voltage, to mesh with horizontal wires arranged in different angles. The computer program implemented used in the mathematical modeling is based on the method proposed by Heppe, which allows obtaining the grounding parameters for homogeneous soil and soil stratified in two layers. The results obtained with the proposed method will be compared with other methods in literature. Also will be presented the results of a grounding grid using wires at various angles.

  8. Ground-Water Quality Data in the Southern Sierra Study Unit, 2006 - Results from the California GAMA Program

    Science.gov (United States)

    Fram, Miranda S.; Belitz, Kenneth

    2007-01-01

    Ground-water quality in the approximately 1,800 square-mile Southern Sierra study unit (SOSA) was investigated in June 2006 as part of the Statewide Basin Assessment Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The GAMA Statewide Basin Assessment Project was developed in response to the Groundwater Quality Monitoring Act of 2001 and is being conducted by the U.S. Geological Survey (USGS) in cooperation with the California State Water Resources Control Board (SWRCB). The Southern Sierra study was designed to provide a spatially unbiased assessment of raw ground-water quality within SOSA, as well as a statistically consistent basis for comparing water quality throughout California. Samples were collected from fifty wells in Kern and Tulare Counties. Thirty-five of the wells were selected using a randomized grid-based method to provide statistical representation of the study area, and fifteen were selected to evaluate changes in water chemistry along ground-water flow paths. The ground-water samples were analyzed for a large number of synthetic organic constituents [volatile organic compounds (VOCs), pesticides and pesticide degradates, pharmaceutical compounds, and wastewater-indicator compounds], constituents of special interest [perchlorate, N-nitrosodimethylamine (NDMA), and 1,2,3-trichloropropane (1,2,3-TCP)], naturally occurring inorganic constituents [nutrients, major and minor ions, and trace elements], radioactive constituents, and microbial indicators. Naturally occurring isotopes [tritium, and carbon-14, and stable isotopes of hydrogen and oxygen in water], and dissolved noble gases also were measured to help identify the source and age of the sampled ground water. Quality-control samples (blanks, replicates, and samples for matrix spikes) were collected for approximately one-eighth of the wells, and the results for these samples were used to evaluate the quality of the data for the ground-water samples. Assessment of the

  9. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    Science.gov (United States)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  10. Is air transport of stroke patients faster than ground transport?

    DEFF Research Database (Denmark)

    Hesselfeldt, Rasmus; Gyllenborg, Jesper; Steinmetz, Jacob

    2014-01-01

    BACKGROUND: Helicopters are widely used for interhospital transfers of stroke patients, but the benefit is sparsely documented. We hypothesised that helicopter transport would reduce system delay to thrombolytic treatment at the regional stroke centre. METHODS: In this prospective controlled...... observational study, we included patients referred to a stroke centre if their ground transport time exceeded 30 min, or they were transported by a secondarily dispatched, physician-staffed helicopter. The primary endpoint was time from telephone contact to triaging neurologist to arrival in the stroke centre....... Secondary endpoints included modified Rankin Scale at 3 months, 30-day and 1-year mortality. RESULTS: A total of 330 patients were included; 265 with ground transport and 65 with helicopter, of which 87 (33%) and 22 (34%), received thrombolysis, respectively (p=0.88). Time from contact to triaging...

  11. Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions

    International Nuclear Information System (INIS)

    1993-01-01

    This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake's ground motion is a function of the earthquake's magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is a stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. Therefore, empirically based approaches that are used for other regions, such as Western North America, are not appropriate for Eastern North America. Moreover, recent advances in science and technology have now made it possible to combine theoretical and empirical methods to develop new procedures and models for estimating ground motion. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. Specifically considered are magnitudes M from 5 to 8, distances from 0 to 500 km, and frequencies from 1 to 35 Hz

  12. Reliability Of A Novel Intracardiac Electrogram Method For AV And VV Delay Optimization And Comparability To Echocardiography Procedure For Determining Optimal Conduction Delays In CRT Patients

    Directory of Open Access Journals (Sweden)

    N Reinsch

    2009-03-01

    Full Text Available Background: Echocardiography is widely used to optimize CRT programming. A novel intracardiac electrogram method (IEGM was recently developed as an automated programmer-based method, designed to calculate optimal atrioventricular (AV and interventricular (VV delays and provide optimized delay values as an alternative to standard echocardiographic assessment.Objective: This study was aimed at determining the reliability of this new method. Furthermore the comparability of IEGM to existing echocardiographic parameters for determining optimal conduction delays was verified.Methods: Eleven patients (age 62.9± 8.7; 81% male; 73% ischemic, previously implanted with a cardiac resynchronisation therapy defibrillator (CRT-D underwent both echocardiographic and IEGM-based delay optimization.Results: Applying the IEGM method, concordance of three consecutively performed measurements was found in 3 (27% patients for AV delay and in 5 (45% patients for VV delay. Intra-individual variation between three measurements as assessed by the IEGM technique was up to 20 ms (AV: n=6; VV: n=4. E-wave, diastolic filling time and septal-to-lateral wall motion delay emerged as significantly different between the echo and IEGM optimization techniques (p < 0.05. The final AV delay setting was significantly different between both methods (echo: 126.4 ± 29.4 ms, IEGM: 183.6 ± 16.3 ms; p < 0.001; correlation: R = 0.573, p = 0.066. VV delay showed significant differences for optimized delays (echo: 46.4 ± 23.8 ms, IEGM: 10.9 ± 7.0 ms; p <0.01; correlation: R = -0.278, p = 0.407.Conclusion: The automated programmer-based IEGM-based method provides a simple and safe method to perform CRT optimization. However, the reliability of this method appears to be limited. Thus, it remains difficult for the examiner to determine the optimal hemodynamic settings. Additionally, as there was no correlation between the optimal AV- and VV-delays calculated by the IEGM method and the echo

  13. Classic conditioning in aged rabbits: delay, trace, and long-delay conditioning.

    Science.gov (United States)

    Solomon, P R; Groccia-Ellison, M E

    1996-06-01

    Young (0.5 years) and aged (2+, 3+, and 4+ years) rabbits underwent acquisition of the classically conditioned nictitating membrane response in a delay (500-ms conditioned stimulus [CS], 400-ms interstimulus interval [ISI]), long-delay (1,000-ms CS, 900-ms ISI), or trace (500-ms CS, 400-ms stimulus-free period) paradigm. Collapsing across age groups, there is a general tendency for animals to acquire trace conditioning more slowly than delay conditioning. Collapsing across conditioning paradigms, there is a general tendency for aged animals to acquire more slowly than younger animals. Of greater significance, however, are the age differences in the different conditioning paradigms. In the delay and long-delay paradigms, significant conditioning deficits first appeared in the 4(+)-year-old group. In the trace conditioning paradigm, significant conditioning deficits became apparent in the 2(+)-year-old animals.

  14. Waste/Rock Interactions Technology Program: the status of radionuclide sorption-desorption studies performed by the WRIT program

    International Nuclear Information System (INIS)

    Serne, R.J.; Relyea, J.F.

    1982-04-01

    The most credible means for radionuclides disposed as solid wastes in deep-geologic repositories to reach the biosphere is through dissolution of the solid waste and subsequent radionuclide transport by circulating ground water. Thus safety assessment activities must consider the physicochemical interactions between radionculides present in ground water with package components, rocks and sediments since these processes can significantly delay or constrain the mass transport of radionuclides in comparison to ground-water movement. This paper focuses on interactions between dissolved radiouclides in ground water and rocks and sediments away from the near-field repository. The primary mechanism discussed is adsorption-desorption, which has been studied using two approaches. Empirical studies of adsorption-desorption rely on distribution coefficient measurements while mechanism studies strive to identify, differentiate and quantify the processes that control nuclide retardation

  15. Global synchronization criteria with channel time-delay for chaotic time-delay system

    International Nuclear Information System (INIS)

    Sun Jitao

    2004-01-01

    Based on the Lyapunov stabilization theory, matrix measure, and linear matrix inequality (LMIs), this paper studies the chaos synchronization of time-delay system using the unidirectional linear error feedback coupling with time-delay. Some generic conditions of chaos synchronization with time-delay in the transmission channel is established. The chaotic Chua's circuit is used for illustration, where the coupling parameters are determined according to the criteria under which the global chaos synchronization of the time-delay coupled systems is achieved

  16. Angular momentum distributions and delayed feeding in (d,3n) reaction to deformed nuclei

    International Nuclear Information System (INIS)

    Dracoulis, G.D.; Ferguson, S.M.; Newton, J.O.; Slocombe, M.G.

    1976-11-01

    The relative intensities of ground state rotational band transitions in 158 Dy, 164 Er, 168 Yb, 174 Hf and 180 W have been studied with particular emphasis on the identification of delayed feeding from high K isomers. The results are interpreted in terms of a simple formulation of the K-conservation model which is introduced to explain the discrepancy between the observed intensity distributions and those expected from the statistical model. (Author)

  17. Delayed minocycline but not delayed mild hypothermia protects against embolic stroke

    Directory of Open Access Journals (Sweden)

    Noor Raza

    2002-04-01

    Full Text Available Abstract Background Inflammatory reactions occurring in the brain after ischemia may contribute to secondary damage. In the present study, effects of minocycline, an anti-inflammatory agent, alone or in combination with mild hypothermia on focal embolic cerebral ischemia have been examined. Methods Focal ischemic injury was induced by embolizing a preformed clot into the middle cerebral artery (MCA. Infarction volume was measured at 48 h after the injury. Mortality was also recorded. Results Delayed administration of minocycline alone or delayed minocycline plus delayed mild hypothermia reduced the infarction volume significantly. However, delayed mild hypothermia alone was not protective and delayed mild hypothermia in combination with minocycline did not show any additive effect. Conclusions These results suggest that minocycline is beneficial in focal ischemic brain injury, and the lack of the enhanced neuroprotection may be due to the brief exposure to hypothermia.

  18. Annual simulations of heat pump systems with vertical ground heat exchangers

    Energy Technology Data Exchange (ETDEWEB)

    Bernier, M.A.; Randriamiarinjatovo, D. [Ecole Polytechnique, Montreal, PQ (Canada). Dept. de Genie Mecanique

    2001-06-01

    The recent increased popularity in ground-coupled heat pump (GCHP) systems is due to their energy saving potential. However, in order for a GCHP to operate efficiently, they must be sized correctly. This paper presents a method to perform annual simulations of GCHP systems to optimize the length of the ground heat exchanger and provide annual energy consumption data. A computer program has been developed to simulate the building load, heat pump and the ground heat exchanger, the three most distinct parts of the system. The coupled governing equations of these three models are solved simultaneously until a converged solution is obtained at each time step. The simulations are performed using the Engineering Equation Solver (EES). This program has proven to be useful in balancing ground heat exchanger length against heat pump energy consumption.15 refs., 9 figs.

  19. Ground-Water Quality Data in the Santa Clara River Valley Study Unit, 2007: Results from the California GAMA Program

    Science.gov (United States)

    Montrella, Joseph; Belitz, Kenneth

    2009-01-01

    Ground-water quality in the approximately 460-square-mile Santa Clara River Valley study unit (SCRV) was investigated from April to June 2007 as part of the statewide Priority Basin project of the Ground-Water Ambient Monitoring and Assessment (GAMA) Program. The GAMA Priority Basin project was developed in response to the Groundwater Quality Monitoring Act of 2001 and is being conducted by the U.S. Geological Survey (USGS) in cooperation with the California State Water Resources Control Board (SWRCB). The study was designed to provide a spatially unbiased assessment of the quality of raw ground water used for public water supplies within SCRV, and to facilitate a statistically consistent basis for comparing water quality throughout California. Fifty-seven ground-water samples were collected from 53 wells in Ventura and Los Angeles Counties. Forty-two wells were selected using a randomized grid-based method to provide statistical representation of the study area (grid wells). Eleven wells (understanding wells) were selected to further evaluate water chemistry in particular parts of the study area, and four depth-dependent ground-water samples were collected from one of the eleven understanding wells to help understand the relation between water chemistry and depth. The ground-water samples were analyzed for a large number of synthetic organic constituents (volatile organic compounds [VOC], pesticides and pesticide degradates, potential wastewater-indicator compounds, and pharmaceutical compounds), a constituent of special interest (perchlorate), naturally occurring inorganic constituents (nutrients, major and minor ions, and trace elements), radioactive constituents, and microbial constituents. Naturally occurring isotopes (tritium, carbon-13, carbon-14 [abundance], stable isotopes of hydrogen and oxygen in water, stable isotopes of nitrogen and oxygen in nitrate, chlorine-37, and bromine-81), and dissolved noble gases also were measured to help identify the source

  20. Ground-Water Quality Data in the Coastal Los Angeles Basin Study Unit, 2006: Results from the California GAMA Program

    Science.gov (United States)

    Mathany, Timothy M.; Land, Michael; Belitz, Kenneth

    2008-01-01

    Ground-water quality in the approximately 860 square-mile Coastal Los Angeles Basin study unit (CLAB) was investigated from June to November of 2006 as part of the Statewide Basin Assessment Project of the Ground-Water Ambient Monitoring and Assessment (GAMA) Program. The GAMA Statewide Basin Assessment was developed in response to the Ground-Water Quality Monitoring Act of 2001, and is being conducted by the U.S. Geological Survey (USGS) in cooperation with the California State Water Resources Control Board (SWRCB). The Coastal Los Angeles Basin study was designed to provide a spatially unbiased assessment of raw ground-water quality within CLAB, as well as a statistically consistent basis for comparing water quality throughout California. Samples were collected from 69 wells in Los Angeles and Orange Counties. Fifty-five of the wells were selected using a spatially distributed, randomized grid-based method to provide statistical representation of the study area (?grid wells?). Fourteen additional wells were selected to evaluate changes in ground-water chemistry or to gain a greater understanding of the ground-water quality within a specific portion of the Coastal Los Angeles Basin study unit ('understanding wells'). Ground-water samples were analyzed for: a large number of synthetic organic constituents [volatile organic compounds (VOCs), gasoline oxygenates and their degradates, pesticides, polar pesticides, and pesticide degradates, pharmaceutical compounds, and potential wastewater-indicators]; constituents of special interest [perchlorate, N-nitrosodimethylamine (NDMA), 1,4-dioxane, and 1,2,3-trichloropropane (1,2,3-TCP)]; inorganic constituents that can occur naturally [nutrients, major and minor ions, and trace elements]; radioactive constituents [gross-alpha and gross-beta radiation, radium isotopes, and radon-222]; and microbial indicators. Naturally occurring isotopes [stable isotopic ratios of hydrogen and oxygen, and activities of tritium and carbon-14

  1. Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions

    International Nuclear Information System (INIS)

    1993-01-01

    This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake's ground motion is a function of the earthquake's magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is a stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. Therefore, empirically based approaches that are used for other regions, such as Western North America, are not appropriate for Eastern North America. Moreover, recent advances in science and technology have now made it possible to combine theoretical and empirical methods to develop new procedures and models for estimating ground motion. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. Specifically considered are magnitudes M from 5 to 8, distances from 0 to 500 km, and frequencies from 1 to 35 Hz. This document, Volume IV, provides Appendix 8.B, Laboratory Investigations of Dynamic Properties of Reference Sites

  2. Delayed puberty in girls

    Science.gov (United States)

    ... sexual development - girls; Pubertal delay - girls; Constitutional delayed puberty ... In most cases of delayed puberty, growth changes just begin later than usual, sometimes called a late bloomer. Once puberty begins, it progresses normally. This pattern runs ...

  3. Description of ground motion data processing codes: Volume 3

    International Nuclear Information System (INIS)

    Sanders, M.L.

    1988-02-01

    Data processing codes developed to process ground motion at the Nevada Test Site for the Weapons Test Seismic Investigations Project are used today as part of the program to process ground motion records for the Nevada Nuclear Waste Storage Investigations Project. The work contained in this report documents and lists codes and verifies the ''PSRV'' code. 39 figs

  4. Delayed Puberty (For Teens)

    Science.gov (United States)

    ... Safe Videos for Educators Search English Español Delayed Puberty KidsHealth / For Teens / Delayed Puberty What's in this ... wonder if there's anything wrong. What Is Delayed Puberty? Puberty is the time when your body grows ...

  5. Beta-delayed particle decay of 17Ne

    International Nuclear Information System (INIS)

    Morton, A.C.; Chow, J.C.; King, J.D.; Boyd, R.N.; Bateman, N.P.T.; Buchmann, L.; D'Auria, J.M.; Davinson, T.; Dombsky, M.; Galster, W.; Gete, E.; Giesen, U.; Iliadis, C.; Jackson, K.P.; Powell, J.; Roy, G.; Shotter, A.

    2002-01-01

    The β-delayed particle decay of 17 Ne has been studied via proton-γ coincidences, time-of-flight measurements and the ''ratio-cut technique'', allowing cleanly-separated proton and α-particle spectra to be obtained. A complete set of proton and α branching ratios for the decay of 14 excited states in 17 F to the ground and excited states of 16 O and 13 N has been determined and branching ratios for the β decay of 17 Ne to these states have been deduced. From the branching ratios, f A t values and reduced Gamow-Teller matrix elements were calculated; no indication of isospin mixing in the isobaric analog state in 17 F was observed. From the measurement of proton-γ angular correlations, combined with the selection rules for an allowed β decay, we obtain J π =((1)/(2)) - for states at 8.436 and 9.450 MeV and ((3)/(2)) - for the state at 10.030 MeV in 17 F. Probabilities for the β-delayed pα decay to 12 C through the tails of the subthreshold 7.117 and 6.917 MeV states in 16 O have been calculated and the feasibility of using such decays to provide information about the rates for the E1 and E2 components of the 12 C(α,γ) 16 O reaction is discussed

  6. Hanford ground-water data base management guide and user's manual

    International Nuclear Information System (INIS)

    Mitchell, P.J.; Argo, R.S.; Bradymire, S.L.; Newbill, C.A.

    1985-05-01

    This management guide and user's manual is a working document for the computerized Hanford Ground-water Data Base maintained by the Geosciences Research and Engineering Department at Pacific Northwest Laboratory for the Hanford Ground-Water Surveillance Program. The program is managed by the Occupational and Environmental Protection Department for the US Department of Energy. The data base is maintained to provide rapid access to data that are rountinely collected from ground-water monitoring wells at the Hanford site. The data include water levels, sample analyses, geologic descriptions and well construction information of over 3000 existing or destroyed wells. These data are used to monitor water quality and for the evaluation of ground-water flow and pollutant transport problems. The management guide gives instructions for maintenance of the data base on the Digital Equipment Corporation PDP 11/70 Computer using the CIRMIS (Comprehensive Information Retrieval and Model Input Sequence) data base management software developed at Pacific Northwest Laboratory. Maintenance activities include inserting, modifying and deleting data, making back-up copies of the data base, and generating tables for annual monitoring reports. The user's guide includes instructions for running programs to retrieve the data in the form of listings of graphical plots. 3 refs

  7. GRASP [GRound-Water Adjunct Sensitivity Program]: A computer code to perform post-SWENT [simulator for water, energy, and nuclide transport] adjoint sensitivity analysis of steady-state ground-water flow: Technical report

    International Nuclear Information System (INIS)

    Wilson, J.L.; RamaRao, B.S.; McNeish, J.A.

    1986-11-01

    GRASP (GRound-Water Adjunct Senstivity Program) computes measures of the behavior of a ground-water system and the system's performance for waste isolation, and estimates the sensitivities of these measures to system parameters. The computed measures are referred to as ''performance measures'' and include weighted squared deviations of computed and observed pressures or heads, local Darcy velocity components and magnitudes, boundary fluxes, and travel distance and time along travel paths. The sensitivities are computed by the adjoint method and are exact derivatives of the performance measures with respect to the parameters for the modeled system, taken about the assumed parameter values. GRASP presumes steady-state, saturated grondwater flow, and post-processes the results of a multidimensional (1-D, 2-D, 3-D) finite-difference flow code. This document describes the mathematical basis for the model, the algorithms and solution techniques used, and the computer code design. The implementation of GRASP is verified with simple one- and two-dimensional flow problems, for which analytical expressions of performance measures and sensitivities are derived. The linkage between GRASP and multidimensional finite-difference flow codes is described. This document also contains a detailed user's manual. The use of GRASP to evaluate nuclear waste disposal issues has been emphasized throughout the report. The performance measures and their sensitivities can be employed to assist in directing data collection programs, expedite model calibration, and objectively determine the sensitivity of projected system performance to parameters

  8. Non-goal-directed recall of specific events in apes after long delays.

    Science.gov (United States)

    Lewis, Amy; Call, Josep; Berntsen, Dorthe

    2017-07-12

    We examined if apes spontaneously remember one-time, distinctive events across long delays when probed by discriminant cues. Apes witnessed an experimenter hide a cache of food, which they could then retrieve. They retrieved one of two food types; one more distinctive than the other. Two, 10 or 50 weeks later, the apes returned to the same enclosure and found a piece of the previously hidden food on the ground. An experimenter who had not hidden the food was also present. Apes immediately searched the location where the food was previously hidden (no food was here), showing recall of the event. One week later, apes returned to the same enclosure, with the same food on the ground, but now the experimenter that had hidden the food was present. Again, apes immediately searched the hiding location. Apes that had not witnessed the hiding event did not search. There was no significant effect of food type, and retention declined from exposure to the two-week delay, then levelled, consistent with the forgetting curve in humans (Ebbinghaus, H. 1964 Memory: a contribution to experimental psychology (transl. H.A. Ruger & C.E. Bussenvis). New York, NY: Dover. (Original work published 1885.)). This is the first study to show apes can recall a one-time, non-goal-directed event longer than two weeks ago and that apes' recall declines in accordance with a standard retention function. © 2017 The Author(s).

  9. Scanning Raman lidar for tropospheric water vapor profiling and GPS path delay correction

    Science.gov (United States)

    Tarniewicz, Jerome; Bock, Olivier; Pelon, Jacques R.; Thom, Christian

    2002-01-01

    The design of a ground based and transportable combined Raman elastic-backscatter lidar for the remote sensing of lower tropospheric water vapor and nitrogen concentration is described. This lidar is intended to be used for an external calibration of the wet path delay of GPS signals. A description of the method used to derive water vapor and nitrogen profiles in the lower troposphere is given. The instrument has been tested during the ESCOMPTE campaign in June 2001 and first measurements are presented.

  10. Ground-Based Photometric Measurements HAES Program Support.

    Science.gov (United States)

    1979-01-31

    A3, A-, E, F (J) Spatial structure of optical irregularities from F (K) Auroral electric fields from G, (BI, 132) ( L ) Pederson and Hall...investigator on this program was Mr. R. D. Sears. Also contributing significantly to the program were D. R. Hillendahl and G. Rogers . We acknowledge the...WBM experiment 57 23 Plot of height-integrated Pederson conductivities versus horizontal distance from Chatanika zenith for WBM experiment 58 24

  11. Application of ray-traced tropospheric slant delays to geodetic VLBI analysis

    Science.gov (United States)

    Hofmeister, Armin; Böhm, Johannes

    2017-08-01

    The correction of tropospheric influences via so-called path delays is critical for the analysis of observations from space geodetic techniques like the very long baseline interferometry (VLBI). In standard VLBI analysis, the a priori slant path delays are determined using the concept of zenith delays, mapping functions and gradients. The a priori use of ray-traced delays, i.e., tropospheric slant path delays determined with the technique of ray-tracing through the meteorological data of numerical weather models (NWM), serves as an alternative way of correcting the influences of the troposphere on the VLBI observations within the analysis. In the presented research, the application of ray-traced delays to the VLBI analysis of sessions in a time span of 16.5 years is investigated. Ray-traced delays have been determined with program RADIATE (see Hofmeister in Ph.D. thesis, Department of Geodesy and Geophysics, Faculty of Mathematics and Geoinformation, Technische Universität Wien. http://resolver.obvsg.at/urn:nbn:at:at-ubtuw:1-3444, 2016) utilizing meteorological data provided by NWM of the European Centre for Medium-Range Weather Forecasts (ECMWF). In comparison with a standard VLBI analysis, which includes the tropospheric gradient estimation, the application of the ray-traced delays to an analysis, which uses the same parameterization except for the a priori slant path delay handling and the used wet mapping factors for the zenith wet delay (ZWD) estimation, improves the baseline length repeatability (BLR) at 55.9% of the baselines at sub-mm level. If no tropospheric gradients are estimated within the compared analyses, 90.6% of all baselines benefit from the application of the ray-traced delays, which leads to an average improvement of the BLR of 1 mm. The effects of the ray-traced delays on the terrestrial reference frame are also investigated. A separate assessment of the RADIATE ray-traced delays is carried out by comparison to the ray-traced delays from the

  12. Reward acts as a signal to control delay-period activity in delayed-response tasks.

    Science.gov (United States)

    Ichihara-Takeda, Satoe; Takeda, Kazuyoshi; Funahashi, Shintaro

    2010-03-31

    Prefrontal delay-period activity represents a neural mechanism for the active maintenance of information and needs to be controlled by some signal to appropriately operate working memory. To examine whether reward-delivery acts as this signal, the effects of delay-period activity in response to unexpected reward-delivery were examined by analyzing single-neuron activity recorded in the primate dorsolateral prefrontal cortex. Among neurons that showed delay-period activity, 34% showed inhibition of this activity in response to unexpected reward-delivery. The delay-period activity of these neurons was affected by the expectation of reward-delivery. The strength of the reward signal in controlling the delay-period activity is related to the strength of the effect of reward information on the delay-period activity. These results indicate that reward-delivery acts as a signal to control delay-period activity.

  13. XML Flight/Ground Data Dictionary Management

    Science.gov (United States)

    Wright, Jesse; Wiklow, Colette

    2007-01-01

    A computer program generates Extensible Markup Language (XML) files that effect coupling between the command- and telemetry-handling software running aboard a spacecraft and the corresponding software running in ground support systems. The XML files are produced by use of information from the flight software and from flight-system engineering. The XML files are converted to legacy ground-system data formats for command and telemetry, transformed into Web-based and printed documentation, and used in developing new ground-system data-handling software. Previously, the information about telemetry and command was scattered in various paper documents that were not synchronized. The process of searching and reading the documents was time-consuming and introduced errors. In contrast, the XML files contain all of the information in one place. XML structures can evolve in such a manner as to enable the addition, to the XML files, of the metadata necessary to track the changes and the associated documentation. The use of this software has reduced the extent of manual operations in developing a ground data system, thereby saving considerable time and removing errors that previously arose in the translation and transcription of software information from the flight to the ground system.

  14. Delay-dependent exponential stability of cellular neural networks with time-varying delays

    International Nuclear Information System (INIS)

    Zhang Qiang; Wei Xiaopeng; Xu Jin

    2005-01-01

    The global exponential stability of cellular neural networks (CNNs) with time-varying delays is analyzed. Two new sufficient conditions ensuring global exponential stability for delayed CNNs are obtained. The conditions presented here are related to the size of delay. The stability results improve the earlier publications. Two examples are given to demonstrate the effectiveness of the obtained results

  15. Assessing delay discounting in mice

    OpenAIRE

    Mitchell, Suzanne H.

    2014-01-01

    Delay discounting (also intertemporal choice or impulsive choice) is the process by which delayed outcomes, such as delayed food delivery, are valued less than the same outcomes delivered immediately or with a shorter delay. This process is of interest because many psychopathologies, including substance dependence, pathological gambling, attention deficit hyperactivity disorder and conduct disorder, are characterized by heightened levels of delay discounting. Some of these disorders are herit...

  16. Modelling delays in pharmacokinetics

    International Nuclear Information System (INIS)

    Farooqi, Z.H.; Lambrecht, R.M.

    1990-01-01

    Linear system analysis has come to form the backbone of pharmacokinetics. Natural systems usually involve time delays, thus models incorporating them would be an order closer approximation to the real world compared to those that do not. Delays may be modelled in several ways. The approach considered in this study is to have a discrete-time delay dependent rate with the delay respresenting the duration between the entry of a drug into a compartment and its release in some form (may be as a metabolite) from the compartment. Such a delay may be because of one or more of several physiological reasons, like, formation of a reservoir, slow metabolism, or receptor binding. The mathematical structure this gives rise to is a system of delay-differential equations. Examples are given of simple one and two compartment systems with drugs like bumetanide, carbamazepine, and quinolone-caffeine interaction. In these examples generally a good fit is obtained and the suggested models form a good approximation. 21 refs., 6 figs

  17. Ground-Water Quality Data in the Southeast San Joaquin Valley, 2005-2006 - Results from the California GAMA Program

    Science.gov (United States)

    Burton, Carmen A.; Belitz, Kenneth

    2008-01-01

    Ground-water quality in the approximately 3,800 square-mile Southeast San Joaquin Valley study unit (SESJ) was investigated from October 2005 through February 2006 as part of the Priority Basin Assessment Project of Ground-Water Ambient Monitoring and Assessment (GAMA) Program. The GAMA Statewide Basin Assessment project was developed in response to the Ground-Water Quality Monitoring Act of 2001 and is being conducted by the California State Water Resources Control Board (SWRCB) in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory (LLNL). The SESJ study was designed to provide a spatially unbiased assessment of raw ground-water quality within SESJ, as well as a statistically consistent basis for comparing water quality throughout California. Samples were collected from 99 wells in Fresno, Tulare, and Kings Counties, 83 of which were selected using a spatially distributed, randomized grid-based method to provide statistical representation of the study area (grid wells), and 16 of which were sampled to evaluate changes in water chemistry along ground-water flow paths or across alluvial fans (understanding wells). The ground-water samples were analyzed for a large number of synthetic organic constituents (volatile organic compounds [VOCs], pesticides and pesticide degradates, and pharmaceutical compounds), constituents of special interest (perchlorate, N-nitrosodimethylamine, and 1,2,3-trichloropropane), naturally occurring inorganic constituents (nutrients, major and minor ions, and trace elements), radioactive constituents, and microbial indicators. Naturally occurring isotopes (tritium, and carbon-14, and stable isotopes of hydrogen, oxygen, nitrogen, and carbon), and dissolved noble gases also were measured to help identify the source and age of the sampled ground water. Quality-control samples (blanks, replicates, samples for matrix spikes) were collected at approximately 10 percent of the wells, and the results

  18. Revised ground-water monitoring compliance plan for the 300 area process trenches

    Energy Technology Data Exchange (ETDEWEB)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

  19. Ground-Water Quality Data in the San Francisco Bay Study Unit, 2007: Results from the California GAMA Program

    Science.gov (United States)

    Ray, Mary C.; Kulongoski, Justin T.; Belitz, Kenneth

    2009-01-01

    Ground-water quality in the approximately 620-square-mile San Francisco Bay study unit (SFBAY) was investigated from April through June 2007 as part of the Priority Basin project of the Ground-Water Ambient Monitoring and Assessment (GAMA) Program. The GAMA Priority Basin project was developed in response to the Groundwater Quality Monitoring Act of 2001, and is being conducted by the U.S. Geological Survey (USGS) in cooperation with the California State Water Resources Control Board (SWRCB). The study was designed to provide a spatially unbiased assessment of raw ground-water quality, as well as a statistically consistent basis for comparing water quality throughout California. Samples in SFBAY were collected from 79 wells in San Francisco, San Mateo, Santa Clara, Alameda, and Contra Costa Counties. Forty-three of the wells sampled were selected using a spatially distributed, randomized grid-based method to provide statistical representation of the study unit (grid wells). Thirty-six wells were sampled to aid in evaluation of specific water-quality issues (understanding wells). The ground-water samples were analyzed for a large number of synthetic organic constituents (volatile organic compounds [VOC], pesticides and pesticide degradates, pharmaceutical compounds, and potential wastewater-indicator compounds), constituents of special interest (perchlorate and N-nitrosodimethylamine [NDMA]), naturally occurring inorganic constituents (nutrients, major and minor ions, trace elements, chloride and bromide isotopes, and uranium and strontium isotopes), radioactive constituents, and microbial indicators. Naturally occurring isotopes (tritium, carbon-14 isotopes, and stable isotopes of hydrogen, oxygen, nitrogen, boron, and carbon), and dissolved noble gases (noble gases were analyzed in collaboration with Lawrence Livermore National Laboratory) also were measured to help identify the source and age of the sampled ground water. Quality-control samples (blank samples

  20. REASONS FOR PATIENT DELAYS & HEALTH SYSTEM DELAYS FOR TUBERCULOSIS IN SOUTH INDIA

    Directory of Open Access Journals (Sweden)

    Kapil Goel

    2011-12-01

    Full Text Available Background: Globally, the burden of Tuberculosis is escalating. Early diagnosis and prompt initiation of tuberculosis treatment is essential for an effective tuberculosis control programme. Objectives: To study the self reported reasons for patient and health system (diagnosis & treatment delays in Tuberculosis patients. Methods: A community based cross sectional study was conducted among 98 new sputum positive TB cases aged > 15 years registered under RNTCP from Oct 2006 to June 2007 & receiving treatment under DOTS in Udupi taluk by interviewing them. Results: Total 98 patients were recruited and 68% were males. Out of 17 patients with patient delays, 82% felt that their symptoms were not severe, 71% felt that patient delay was due to lack of awareness and 71% did not take it seriously. Out of 86 patients with health system delays, 82.6% of patients mentioned that doctor has not advised for sputum examination, 76.7% of patients told that they first consulted a private doctor, 21% of them mentioned that doctor was unaware to diagnose TB. Conclusion: Symptoms not severe is the main reason for the patient delay and doctor didn’t advise for sputum examination is the main reason for health system delays.

  1. Delayed orgasm and anorgasmia.

    Science.gov (United States)

    Jenkins, Lawrence C; Mulhall, John P

    2015-11-01

    Delayed orgasm/anorgasmia defined as the persistent or recurrent difficulty, delay in, or absence of attaining orgasm after sufficient sexual stimulation, which causes personal distress. Delayed orgasm and anorgasmia are associated with significant sexual dissatisfaction. A focused medical history can shed light on the potential etiologies, which include medications, penile sensation loss, endocrinopathies, penile hyperstimulation, and psychological etiologies. Unfortunately, there are no excellent pharmacotherapies for delayed orgasm/anorgasmia, and treatment revolves largely around addressing potential causative factors and psychotherapy. Copyright © 2015 American Society for Reproductive Medicine. Published by Elsevier Inc. All rights reserved.

  2. Delay Bounded Multi-Source Multicast in Software-Defined Networking

    Directory of Open Access Journals (Sweden)

    Thabo Semong

    2018-01-01

    Full Text Available Software-Defined Networking (SDN is the next generation network architecture with exciting application prospects. The control function in SDN is decoupled from the data forwarding plane, hence it provides a new centralized architecture with flexible network resource management. Although SDN is attracting much attention from both industry and research, its advantage over the traditional networks has not been fully utilized. Multicast is designed to deliver content to multiple destinations. The current traffic engineering in SDN focuses mainly on unicast, however, multicast can effectively reduce network resource consumption by serving multiple clients. This paper studies a novel delay-bounded multi-source multicast SDN problem, in which among the set of potential sources, we select a source to build the multicast-tree, under the constraint that the transmission delay for every destination is bounded. This problem is more difficult than the traditional Steiner minimum tree (SMT problem, since it needs to find a source from the set of all potential sources. We model the problem as a mixed-integer linear programming (MILP and prove its NP-Hardness. To solve the problem, a delay bounded multi-source (DBMS scheme is proposed, which includes a DBMS algorithm to build a minimum delay cost DBMS-Forest. Through a MATLAB experiment, we demonstrate that DBMS is significantly more efficient and outperforms other existing algorithms in the literature.

  3. Advanced stellar compass deep space navigation, ground testing results

    DEFF Research Database (Denmark)

    Betto, Maurizio; Jørgensen, John Leif; Jørgensen, Peter Siegbjørn

    2006-01-01

    Deep space exploration is in the agenda of the major space agencies worldwide and at least the European Space Agency (SMART & Aurora Programs) and the American NASA (New Millennium Program) have set up programs to allow the development and the demonstration of technologies that can reduce the risks...... and the costs of the deep space missions. Navigation is the Achilles' heel of deep space. Being performed on ground, it imposes considerable constraints on the system and the operations, it is very expensive to execute, especially when the mission lasts several years and, above all, it is not failure tolerant...... to determine the orbit of a spacecraft autonomously, on-board and without any a priori knowledge of any kind. The solution is robust, elegant and fast. This paper presents the preliminary performances obtained during the ground tests. The results are very positive and encouraging....

  4. Tapetal-Delayed Programmed Cell Death (PCD and Oxidative Stress-Induced Male Sterility of Aegilops uniaristata Cytoplasm in Wheat

    Directory of Open Access Journals (Sweden)

    Zihan Liu

    2018-06-01

    Full Text Available Cytoplasmic male sterility (CMS plays a crucial role in the utilization of hybrid vigor. Pollen development is often accompanied by oxidative metabolism responses and tapetal programmed cell death (PCD, and deficiency in these processes could lead to male sterility. Aegilops uniaristata cytoplasmic male sterility (Mu-CMS wheat is a novel male-sterile line in wheat, which possess important potential in hybrid wheat breeding. However, its CMS mechanisms remain poorly understood. In our study, U87B1-706A, with the Aegilops uniaristata cytoplasm, and the maintainer line 706B were used to explore the abortive reason. Compared with 706B, histological analysis and PCD detection of the anther demonstrated that U87B1-706A appeared as delayed tapetal PCD as well as a disorganized organelle phenotype in the early uninucleate stage. Subsequently, a shrunken microspore and disordered exine structure were exhibited in the late uninucleate stage. While the activities of antioxidase increased markedly, the nonenzymatic antioxidant contents declined obviously following overacummulation of reactive oxygen species (ROS during pollen development in U87B1-706A. Real-time quantitative PCR testified that the transcript levels of the superoxide dismutase (SOD, catalase (CAT, and ascorbate peroxidase (APX genes, encoding pivotal antioxidant enzymes, were up-regulated in early pollen development. Therefore, we deduce excess ROS as a signal may be related to the increased expression levels of enzyme genes, thereby breaking the antioxidative system balance, resulting in delayed tapetal PCD initiation, which finally led to pollen abortion and male sterility in U87B1-706A. These results provide evidence to further explore the mechanisms of abortive pollen in CMS wheat.

  5. Common Ground Between Three Cultures

    Directory of Open Access Journals (Sweden)

    Gloria Dunnivan

    2009-12-01

    Full Text Available The Triwizard program with Israel brought together students from three different communities: an Israeli Arab school, an Israeli Jewish school, and an American public school with few Jews and even fewer Muslims. The two Israeli groups met in Israel to find common ground and overcome their differences through dialogue and understanding. They communicated with the American school via technology such as video-conferencing, Skype, and emails. The program culminated with a visit to the U.S. The goal of the program was to embark upon a process that would bring about intercultural awareness and acceptance at the subjective level, guiding all involved to develop empathy and an insider's view of the other's culture. It was an attempt to have a group of Israeli high school students and a group of Arab Israeli students who had a fearful, distrustful perception of each other find common ground and become friends. TriWizard was designed to have participants begin a dialogue about issues, beliefs, and emotions based on the premise that cross-cultural training strategies that are effective in changing knowledge are those that engage the emotions, and actively develop empathy and an insider's views of another culture focused on what they have in common. Participants learned that they could become friends despite their cultural differences.

  6. Supporting Multiple Programs and Projects at NASA's Kennedy Space Center

    Science.gov (United States)

    Stewart, Camiren L.

    2014-01-01

    With the conclusion of the shuttle program in 2011, the National Aeronautics and Space Administration (NASA) had found itself at a crossroads for finding transportation of United States astronauts and experiments to space. The agency would eventually hand off the taxiing of American astronauts to the International Space Station (ISS) that orbits in Low Earth Orbit (LEO) about 210 miles above the earth under the requirements of the Commercial Crew Program (CCP). By privatizing the round trip journey from Earth to the ISS, the space agency has been given the additional time to focus funding and resources to projects that operate beyond LEO; however, adding even more stress to the agency, the premature cancellation of the program that would succeed the Shuttle Program - The Constellation Program (CxP) -it would inevitably delay the goal to travel beyond LEO for a number of years. Enter the Space Launch System (SLS) and the Orion Multipurpose Crew Vehicle (MPCV). Currently, the SLS is under development at NASA's Marshall Spaceflight Center in Huntsville, Alabama, while the Orion Capsule, built by government contractor Lockheed Martin Corporation, has been assembled and is currently under testing at the Kennedy Space Center (KSC) in Florida. In its current vision, SLS will take Orion and its crew to an asteroid that had been captured in an earlier mission in lunar orbit. Additionally, this vehicle and its configuration is NASA's transportation to Mars. Engineers at the Kennedy Space Center are currently working to test the ground systems that will facilitate the launch of Orion and the SLS within its Ground Services Development and Operations (GSDO) Program. Firing Room 1 in the Launch Control Center (LCC) has been refurbished and outfitted to support the SLS Program. In addition, the Spaceport Command and Control System (SCCS) is the underlying control system for monitoring and launching manned launch vehicles. As NASA finds itself at a junction, so does all of its

  7. Fundamentals of Delayed Coking Joint Industry Project

    Energy Technology Data Exchange (ETDEWEB)

    Michael Volk; Keith Wisecarver

    2003-09-26

    is 2,937,439 barrels/calendar day. These cokers produce 154,607 tons of coke per day and delayed coking accounts for 88% of the world capacity. The delayed coking charge capacity in the United States is 1,787,860 b/cd. Despite its wide commercial use, only relatively few contractors and refiners are truly knowledgeable in delayed-coking design, so that this process carries with it a ''black art'' connotation. Until recently, the expected yield from cokers was determined by a simple laboratory test on the feedstock. As a result of Tulsa University's prior related research, a process model was developed that with additional work could be used to optimize existing delayed cokers over a wide range of potential feedstocks and operating conditions. The objectives of this research program are to: utilize the current micro, batch and pilot unit facilities at The University of Tulsa to enhance the understanding of the coking process; conduct additional micro and pilot unit tests with new and in-house resids and recycles to make current optimization models more robust; conduct focused kinetic experiments to enhance the furnace tube model and to enhance liquid production while minimizing sulfur in the products; conduct detailed foaming studies to optimize the process and minimize process upsets; quantify the parameters that affect coke morphology; and to utilize the knowledge gained from the experimental and modeling studies to enhance the computer programs developed in the previous JIP for optimization of the coking process. These refined computer models will then be tested against refinery data provided by the member companies. Novel concepts will also be explored for hydrogen sulfide removal of furnace gases as well as gas injection studies to reduce over-cracking.

  8. Delay-dependent stability of neural networks of neutral type with time delay in the leakage term

    International Nuclear Information System (INIS)

    Li, Xiaodi; Cao, Jinde

    2010-01-01

    This paper studies the global asymptotic stability of neural networks of neutral type with mixed delays. The mixed delays include constant delay in the leakage term (i.e. 'leakage delay'), time-varying delays and continuously distributed delays. Based on the topological degree theory, Lyapunov method and linear matrix inequality (LMI) approach, some sufficient conditions are derived ensuring the existence, uniqueness and global asymptotic stability of the equilibrium point, which are dependent on both the discrete and distributed time delays. These conditions are expressed in terms of LMI and can be easily checked by the MATLAB LMI toolbox. Even if there is no leakage delay, the obtained results are less restrictive than some recent works. It can be applied to neural networks of neutral type with activation functions without assuming their boundedness, monotonicity or differentiability. Moreover, the differentiability of the time-varying delay in the non-neutral term is removed. Finally, two numerical examples are given to show the effectiveness of the proposed method

  9. ERDA LWR plant technology program: role of government/industry in improving LWR performance

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented under the following chapter headings: executive summary; LWR plant outages; LWR plant construction delays and cancellations; programs addressing plant outages, construction delays, and cancellations; need for additional programs to remedy continuing problems; criteria for government role in LWR commercialization; and the proposed government program

  10. Asteroseismology of solar-type stars with Kepler: III. Ground-based data

    DEFF Research Database (Denmark)

    Karoff, Christoffer; Molenda-Żakowicz , J.

    2010-01-01

    We report on the ground-based follow-up program of spectroscopic and photometric observations of solar-like asteroseismic targets for the Kepler space mission. These stars constitute a large group of more than a thousand objects which are the subject of an intensive study by the Kepler Asteroseis......We report on the ground-based follow-up program of spectroscopic and photometric observations of solar-like asteroseismic targets for the Kepler space mission. These stars constitute a large group of more than a thousand objects which are the subject of an intensive study by the Kepler...

  11. Using extant literature in a grounded theory study: a personal account.

    Science.gov (United States)

    Yarwood-Ross, Lee; Jack, Kirsten

    2015-03-01

    To provide a personal account of the factors in a doctoral study that led to the adoption of classic grounded theory principles relating to the use of literature. Novice researchers considering grounded theory methodology will become aware of the contentious issue of how and when extant literature should be incorporated into a study. The three main grounded theory approaches are classic, Straussian and constructivist, and the seminal texts provide conflicting beliefs surrounding the use of literature. A classic approach avoids a pre-study literature review to minimise preconceptions and emphasises the constant comparison method, while the Straussian and constructivist approaches focus more on the beneficial aspects of an initial literature review and researcher reflexivity. The debate also extends into the wider academic community, where no consensus exists. This is a methodological paper detailing the authors' engagement in the debate surrounding the role of the literature in a grounded theory study. In the authors' experience, researchers can best understand the use of literature in grounded theory through immersion in the seminal texts, engaging with wider academic literature, and examining their preconceptions of the substantive area. The authors concluded that classic grounded theory principles were appropriate in the context of their doctoral study. Novice researchers will have their own sets of circumstances when preparing their studies and should become aware of the different perspectives to make decisions that they can ultimately justify. This paper can be used by other novice researchers as an example of the decision-making process that led to delaying a pre-study literature review and identifies the resources used to write a research proposal when using a classic grounded theory approach.

  12. MODICO, 1-D Time-Dependent 1 Group, 2 Group Neutron Diffusion with Delayed Neutron Precursors

    International Nuclear Information System (INIS)

    Camiciola, P.; Cundari, D.; Montagnini, B.

    1992-01-01

    1 - Description of program or function: The program solves the 1-D time-dependent one and two group coarse-mesh neutron diffusion equations, coupled with the equations for the delayed-neutron precursor, in plane geometry. 2 - Method of solution: The program is based on a simple coarse-mesh cubic approximation formula for the spatial behaviour of the flux inside each interval. An implicit scheme (the time-integrated method) is used for the advancement of the solution. The resulting (block three-diagonal) matrix is inverted at each time step by Thomas' method. 3 - Restrictions on the complexity of the problem: Number of coarse- mesh intervals LE 80; number of material regions LE 10; number of delayed-neutron precursor groups LE 10. Typical mesh sizes range from 5 cm to 20 cm; typical step length (non-prompt critical transients) ranges from 0.005 to 0.1 seconds

  13. American Dream Delayed

    DEFF Research Database (Denmark)

    Khorunzhina, Natalia; Miller, Robert A.

    This paper investigates the delay in homeownership and a subsequent reduction in homeownership rate observed over the past decades. We focus on the delay in giving birth to children and increased labor market participation as contributing factors to homeownership dynamics for prime-age female hou...

  14. An Integrated Approach to the Ground Crew Rostering Problem with Work Patterns

    DEFF Research Database (Denmark)

    Lusby, Richard Martin; Hansen, Anders Dohn; Range, Troels Martin

    This paper addresses the Ground Crew Rostering Problem with Work Patterns, an important manpower planning problem arising in the ground operations of airline companies. We present a cutting stock based integer programming formulation of the problem and describe a powerful decomposition approach...

  15. Delayed Orgasm and Anorgasmia

    OpenAIRE

    Jenkins, Lawrence C.; Mulhall, John P.

    2015-01-01

    Delayed orgasm/anorgasmia defined as the persistent or recurrent difficulty, delay in, or absence of attaining orgasm after sufficient sexual stimulation, which causes personal distress. Delayed orgasm and anorgasmia are associated with significant sexual dissatisfaction. A focused medical history can shed light on the potential etiologies; which include: medications, penile sensation loss, endocrinopathies, penile hyperstimulation and psychological etiologies, amongst others. Unfortunately, ...

  16. Derivation and computation of discrete-delay and continuous-delay SDEs in mathematical biology.

    Science.gov (United States)

    Allen, Edward J

    2014-06-01

    Stochastic versions of several discrete-delay and continuous-delay differential equations, useful in mathematical biology, are derived from basic principles carefully taking into account the demographic, environmental, or physiological randomness in the dynamic processes. In particular, stochastic delay differential equation (SDDE) models are derived and studied for Nicholson's blowflies equation, Hutchinson's equation, an SIS epidemic model with delay, bacteria/phage dynamics, and glucose/insulin levels. Computational methods for approximating the SDDE models are described. Comparisons between computational solutions of the SDDEs and independently formulated Monte Carlo calculations support the accuracy of the derivations and of the computational methods.

  17. Attosecond Delays in Molecular Photoionization.

    Science.gov (United States)

    Huppert, Martin; Jordan, Inga; Baykusheva, Denitsa; von Conta, Aaron; Wörner, Hans Jakob

    2016-08-26

    We report measurements of energy-dependent photoionization delays between the two outermost valence shells of N_{2}O and H_{2}O. The combination of single-shot signal referencing with the use of different metal foils to filter the attosecond pulse train enables us to extract delays from congested spectra. Remarkably large delays up to 160 as are observed in N_{2}O, whereas the delays in H_{2}O are all smaller than 50 as in the photon-energy range of 20-40 eV. These results are interpreted by developing a theory of molecular photoionization delays. The long delays measured in N_{2}O are shown to reflect the population of molecular shape resonances that trap the photoelectron for a duration of up to ∼110 as. The unstructured continua of H_{2}O result in much smaller delays at the same photon energies. Our experimental and theoretical methods make the study of molecular attosecond photoionization dynamics accessible.

  18. Construction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs

    Directory of Open Access Journals (Sweden)

    Nuhu Braimah

    2013-07-01

    Full Text Available The time for performance of a project is usually of the essence to the employer and the contractor. This has made it quite imperative for contracting parties to analyse project delays for purposes of making right decisions on potential time and/or cost compensation claims. Over the years, existing delay analysis techniques (DATs for aiding this decision-making have been helpful but have not succeeded in curbing the high incidence of disputes associated with delay claims resolutions. A major source of the disputes lies with the limitations and capabilities of the techniques in their practical use. Developing a good knowledge of these aspects of the techniques is of paramount importance in understanding the real problematic issues involved and their improvement needs. This paper seeks to develop such knowledge and understanding (as part of a wider research work via: an evaluation of the most common DATs based on a case study, a review of the key relevant issues often not addressed by the techniques, and the necessary improvements needs. The evaluation confirmed that the various techniques yield different analysis results for the same delay claims scenario, mainly due to their unique application procedures. The issues that are often ignored in the analysis but would also affect delay analysis results are: functionality of the programming software employed for the analysis, resource loading and levelling requirements, resolving concurrent delays, and delay-pacing strategy. Improvement needs by way of incorporating these issues in the analysis and focusing on them in future research work are the key recommendations of the study.

  19. $\\beta$-delayed neutrons from oriented $^{137,139}$I and $^{87,89}$Br nuclei

    CERN Multimedia

    We propose a world-first measurement of the angular distribution of $\\beta$‐delayed n and $\\gamma$-radiation from oriented $^{137, 139}$I and $^{87,89}$Br nuclei, polarised at low temperature at the NICOLE facility. $\\beta$­-delayed neutron emission is an increasingly important decay mechanism as the drip line is approached and its detailed understanding is essential to phenomena as fundamental as the r‐process and practical as the safe operation of nuclear power reactors. The experiments offer sensitive tests of theoretical input concerning the allowed and first­‐forbidden $\\beta$‐decay strength, the spin-density of neutron emitting states and the partial wave barrier penetration as a function of nuclear deformation. In $^{137}$I and $^{87}$Br the decay feeds predominantly the ground state of the daughters $^{136}$Xe and $^{86}$Kr whereas in $^{139}$I and $^{89}$Br we will explore the use of n-$\\gamma$- coincidence to study neutron transitions to the first and second excited states in the daughters...

  20. Virtual unit delay for digital frequency adaptive T/4 delay phase-locked loop system

    DEFF Research Database (Denmark)

    Yang, Yongheng; Zhou, Keliang; Blaabjerg, Frede

    2016-01-01

    /processor with a fixed sampling rate considering the cost and complexity, where the number of unit delays that have been adopted should be an integer. For instance, in conventional digital control systems, a single-phase T/4 Delay Phase-Locked Loop (PLL) system takes 50 unit delays (i.e., in a 50-Hz system...... Delay PLL system should be done in its implementation. This process will result in performance degradation in the digital control system, as the exactly required number of delays is not realized. Hence, in this paper, a Virtual Unit Delay (VUD) has been proposed to address such challenges to the digital......Digital micro-controllers/processors enable the cost-effective control of grid-connected power converter systems in terms of system monitoring, signal processing (e.g., grid synchronization), control (e.g., grid current and voltage control), etc. Normally, the control is implemented in a micro-controller...

  1. Effects of AV delay programming on ventricular resynchronisation: role of radionuclide ventriculography

    Energy Technology Data Exchange (ETDEWEB)

    Siegrist, Patrick T.; Comte, Nathalie; Holzmeister, Johannes; Suetsch, Gabor; Koepfli, Pascal; Namdar, Mehdi; Duru, Firat; Brunckhorst, Corinna; Scharf, Christoph [Universitiy Hospital Zurich NUK C 32, Cardiovascular Center, Zurich (Switzerland); Kaufmann, Philipp A. [Universitiy Hospital Zurich NUK C 32, Cardiovascular Center, Zurich (Switzerland); University of Zurich, Zurich Center for Integrative Human Physiology, Zurich (Switzerland)

    2008-08-15

    Optimal atrioventricular delay (AVD) setting for cardiac resynchronisation therapy, i.e. biventricular pacing in patients with heart failure, remains a formidable challenge. Thus, the purpose of this study was to evaluate the effects of different AVD on inter- and intra-ventricular resynchronisation using phase histograms of radionuclide ventriculography (RNV). In 17 consecutive patients (mean age 64 {+-} 6 years), RNV was performed 236 {+-} 350 days after pacemaker implantation for cardiac resynchronisation therapy. Images were acquired during atrial pacing at 80 bpm and during biventricular pacing with AVD ranging from 80 to 160 ms. Inter-ventricular dyssynchrony was measured by the delay between the mean phase angles of the left and right ventricles. Intra-ventricular dyssynchrony was measured by the standard deviation (SD) of left ventricular phase histograms. Left ventricular (LV) ejection fraction (EF) was inversely correlated to LV dyssynchrony (SD of LV phase histogram, R = -0.82, p < 0.0001). However, the increase in LVEF by biventricular pacing (mean +4.4 {+-} 4%) showed only modest correlation to the resulting resynchronisation effect (characterised by a -13 {+-} 8 decrease in LV phase histogram SD, R = -0.38, p < 0.0001). RNV is helpful in optimising pacing parameters for resynchronisation therapy. Varying AVD did not have a major impact on intra- or inter-ventricular resynchronisation. Thus, the benefit of AVD-based LVEF optimisation seems to result from atrioventricular resynchronisation. (orig.)

  2. Information transfer via implicit encoding with delay time modulation in a time-delay system

    Energy Technology Data Exchange (ETDEWEB)

    Kye, Won-Ho, E-mail: whkye@kipo.go.kr [Korean Intellectual Property Office, Government Complex Daejeon Building 4, 189, Cheongsa-ro, Seo-gu, Daejeon 302-701 (Korea, Republic of)

    2012-08-20

    A new encoding scheme for information transfer with modulated delay time in a time-delay system is proposed. In the scheme, the message is implicitly encoded into the modulated delay time. The information transfer rate as a function of encoding redundancy in various noise scales is presented and it is analyzed that the implicit encoding scheme (IES) has stronger resistance against channel noise than the explicit encoding scheme (EES). In addition, its advantages in terms of secure communication and feasible applications are discussed. -- Highlights: ► We propose new encoding scheme with delay time modulation. ► The message is implicitly encoded with modulated delay time. ► The proposed scheme shows stronger resistance against channel noise.

  3. Ground-Water Quality Data in the Monterey Bay and Salinas Valley Basins, California, 2005 - Results from the California GAMA Program

    Science.gov (United States)

    Kulongoski, Justin T.; Belitz, Kenneth

    2007-01-01

    Ground-water quality in the approximately 1,000-square-mile Monterey Bay and Salinas Valley study unit was investigated from July through October 2005 as part of the California Ground-Water Ambient Monitoring and Assessment (GAMA) program. The study was designed to provide a spatially unbiased assessment of raw ground-water quality, as well as a statistically consistent basis for comparing water quality throughout California. Samples were collected from 94 public-supply wells and 3 monitoring wells in Monterey, Santa Cruz, and San Luis Obispo Counties. Ninety-one of the public-supply wells sampled were selected to provide a spatially distributed, randomized monitoring network for statistical representation of the study area. Six wells were sampled to evaluate changes in water chemistry: three wells along a ground-water flow path were sampled to evaluate lateral changes, and three wells at discrete depths from land surface were sampled to evaluate changes in water chemistry with depth from land surface. The ground-water samples were analyzed for volatile organic compounds (VOCs), pesticides, pesticide degradates, nutrients, major and minor ions, trace elements, radioactivity, microbial indicators, and dissolved noble gases (the last in collaboration with Lawrence Livermore National Laboratory). Naturally occurring isotopes (tritium, carbon-14, helium-4, and the isotopic composition of oxygen and hydrogen) also were measured to help identify the source and age of the sampled ground water. In total, 270 constituents and water-quality indicators were investigated for this study. This study did not attempt to evaluate the quality of water delivered to consumers; after withdrawal from the ground, water typically is treated, disinfected, and (or) blended with other waters to maintain water quality. In addition, regulatory thresholds apply to treated water that is served to the consumer, not to raw ground water. In this study, only six constituents, alpha radioactivity, N

  4. Tropospheric Delay from VLBI and GNSS Measurements

    Science.gov (United States)

    Gubanov, V. S.

    2018-02-01

    Using an updated version of the QUASAR software package developed at the Institute of Applied Astronomy of the Russian Academy of Sciences, we have processed the VLBI observations within the international CONT14 program (May 6-20, 2014), in which a global network of 17 stations was involved (a total of 250 000 observations). The package update concerned the optimization of data structure and the refinement of stochastic models for the random variations in wet tropospheric delay and atomic clock difference. The main goal of this paper is to compare the VLBI determinations of the tropospheric delay with its independent determinations using global navigation satellite systems (GNSS). We show that both these determinations agree well between themselves only in the case of a global analysis of the VLBI observations, where the VLBI station coordinates are also refined, along with the tropospheric delay and the clock synchronization and Earth orientation parameters. If, alternatively, the station coordinates are insufficiently accurate and are not refined from VLBI observations, then it is appropriate not to determine the tropospheric delay from these observations, but to take it from the publicly accessible independent GNSS data. However, this requires that the VLBI and GNSS techniques operate simultaneously at a common observing site. We have established the shortcomings of the universally accepted method of stabilizing the global solution associated with the absence of a criterion for choosing reference stations and radio sources. Two ways of their elimination are proposed: (i) introducing a coordinated list of weight factors for the errors in the coordinates of such stations and sources into the stabilization algorithm and (ii) adopting a coordinated list of stations and sources the refinement of whose coordinates is not required at all for a certain time.

  5. Impulsive control of time-delay systems using delayed impulse and its application to impulsive master-slave synchronization

    International Nuclear Information System (INIS)

    Sun Jitao; Han Qinglong; Jiang Xiefu

    2008-01-01

    This Letter is concerned with impulsive control of a class of nonlinear time-delay systems. Some uniform stability criteria for the closed-loop time-delay system under delayed impulsive control are derived by using piecewise Lyapunov functions. Then the criteria are applied to impulsive master-slave synchronization of some secure communication systems with transmission delays and sample delays under delayed impulsive control. Two numerical examples are given to illustrate the effectiveness of the derived results

  6. Evaluating data worth for ground-water management under uncertainty

    Science.gov (United States)

    Wagner, B.J.

    1999-01-01

    A decision framework is presented for assessing the value of ground-water sampling within the context of ground-water management under uncertainty. The framework couples two optimization models-a chance-constrained ground-water management model and an integer-programing sampling network design model-to identify optimal pumping and sampling strategies. The methodology consists of four steps: (1) The optimal ground-water management strategy for the present level of model uncertainty is determined using the chance-constrained management model; (2) for a specified data collection budget, the monitoring network design model identifies, prior to data collection, the sampling strategy that will minimize model uncertainty; (3) the optimal ground-water management strategy is recalculated on the basis of the projected model uncertainty after sampling; and (4) the worth of the monitoring strategy is assessed by comparing the value of the sample information-i.e., the projected reduction in management costs-with the cost of data collection. Steps 2-4 are repeated for a series of data collection budgets, producing a suite of management/monitoring alternatives, from which the best alternative can be selected. A hypothetical example demonstrates the methodology's ability to identify the ground-water sampling strategy with greatest net economic benefit for ground-water management.A decision framework is presented for assessing the value of ground-water sampling within the context of ground-water management under uncertainty. The framework couples two optimization models - a chance-constrained ground-water management model and an integer-programming sampling network design model - to identify optimal pumping and sampling strategies. The methodology consists of four steps: (1) The optimal ground-water management strategy for the present level of model uncertainty is determined using the chance-constrained management model; (2) for a specified data collection budget, the monitoring

  7. An assessment of testing requirement impacts on nuclear thermal propulsion ground test facility design

    International Nuclear Information System (INIS)

    Shipers, L.R.; Ottinger, C.A.; Sanchez, L.C.

    1993-01-01

    Programs to develop solid core nuclear thermal propulsion (NTP) systems have been under way at the Department of Defense (DoD), the National Aeronautics and Space Administration (NASA), and the Department of Energy (DOE). These programs have recognized the need for a new ground test facility to support development of NTP systems. However, the different military and civilian applications have led to different ground test facility requirements. The Department of Energy (DOE) in its role as landlord and operator of the proposed research reactor test facilities has initiated an effort to explore opportunities for a common ground test facility to meet both DoD and NASA needs. The baseline design and operating limits of the proposed DoD NTP ground test facility are described. The NASA ground test facility requirements are reviewed and their potential impact on the DoD facility baseline is discussed

  8. Adaptive Control for Autonomous Navigation of Mobile Robots Considering Time Delay and Uncertainty

    Science.gov (United States)

    Armah, Stephen Kofi

    Autonomous control of mobile robots has attracted considerable attention of researchers in the areas of robotics and autonomous systems during the past decades. One of the goals in the field of mobile robotics is development of platforms that robustly operate in given, partially unknown, or unpredictable environments and offer desired services to humans. Autonomous mobile robots need to be equipped with effective, robust and/or adaptive, navigation control systems. In spite of enormous reported work on autonomous navigation control systems for mobile robots, achieving the goal above is still an open problem. Robustness and reliability of the controlled system can always be improved. The fundamental issues affecting the stability of the control systems include the undesired nonlinear effects introduced by actuator saturation, time delay in the controlled system, and uncertainty in the model. This research work develops robustly stabilizing control systems by investigating and addressing such nonlinear effects through analytical, simulations, and experiments. The control systems are designed to meet specified transient and steady-state specifications. The systems used for this research are ground (Dr Robot X80SV) and aerial (Parrot AR.Drone 2.0) mobile robots. Firstly, an effective autonomous navigation control system is developed for X80SV using logic control by combining 'go-to-goal', 'avoid-obstacle', and 'follow-wall' controllers. A MATLAB robot simulator is developed to implement this control algorithm and experiments are conducted in a typical office environment. The next stage of the research develops an autonomous position (x, y, and z) and attitude (roll, pitch, and yaw) controllers for a quadrotor, and PD-feedback control is used to achieve stabilization. The quadrotor's nonlinear dynamics and kinematics are implemented using MATLAB S-function to generate the state output. Secondly, the white-box and black-box approaches are used to obtain a linearized

  9. Prehospital delay in acute coronary syndrome--an analysis of the components of delay

    DEFF Research Database (Denmark)

    Ottesen, Michael Mundt; Dixen, Ulrik; Torp-Pedersen, Christian

    2004-01-01

    BACKGROUND: Prompt hospital admission is essential when treating acute coronary syndrome. Delay prior to admission is unnecessarily long. Therefore, a thorough scrutiny of the influence of characteristics, circumstantial and subjective variables on elements of prehospital delay among patients...... admitted with acute coronary syndrome is warranted. METHODS: A structured interview was conducted on 250 consecutive patients admitted alive with acute coronary syndrome. RESULTS: Median prehospital, decision, physician and transportation delays were 107, 74, 25 and 22 min, respectively. Women (n=77) had...... of acute coronary syndrome among women, and thereby contributes to unnecessary long delay to treatment. The patient's prior experience and interpretation has a significant influence on behaviour....

  10. Communication key using delay times in time-delayed chaos synchronization

    International Nuclear Information System (INIS)

    Kim, Chil-Min; Kye, Won-Ho; Rim, Sunghwan; Lee, Soo-Young

    2004-01-01

    We propose an efficient key scheme, which can generate a great number of communication keys, for communication using chaos synchronization. We have attained the keys from delay times of time-delay coupled chaotic systems. We explain the scheme and the efficiency by coupling Henon and logistic maps and illustrate them by coupling Navier-Stokes and Lorenz equations as a continuous system

  11. Patient delay is the main cause of treatment delay in acute limb ischemia: an investigation of pre- and in-hospital time delay

    DEFF Research Database (Denmark)

    Londero, Louise Skovgaard; Nørgaard, Birgitte; Houlind, Kim Christian

    2014-01-01

    Abstract BACKGROUND: The prognosis of acute limb ischemia is severe, with amputation rates of up to 25% and in-hospital mortality of 9-15%. Delay in treatment increases the risk of major amputation and may be present at different stages, including patient delay, doctors´ delay and waiting time...... in the emergency department. It is important to identify existing problems in order to reduce time delay. The aim of this study was to collect data for patients with acute limb ischemia and to evaluate the time delay between the different events from onset of symptoms to specialist evaluation and further treatment...... (median (range)) was identified. From onset of symptoms to first contact with a doctor the time for all patients were 24 (0-1200) hours. Thirty patients needed immediate intervention. In the group of fourteen patients who had immediate operation, the median time from vascular evaluation...

  12. Delay in DOTS for new pulmonary tuberculosis patient from rural area of Wardha District, India

    Directory of Open Access Journals (Sweden)

    Shilpa Bawankule

    2010-07-01

    Full Text Available Vast majority of active tuberculosis patients seeks treatment, do so promptly, still many patients spend a great deal of time and money “shopping for health” and too often they do not receive either accurate diagnosis or effective treatment, despite spending considerable resources. Objective: To find out the time taken to, for diagnosis of tuberculosis and to put patient on DOTS from the onset of symptoms and pattern of health seeking behavior of new pulmonary tuberculosis patients. A cross-sectional rapid assessment using qualitative (FGD and quantitative (Interview methods conducted at DOTS center of tertiary care hospital from rural Wardha. Participants: 53 pulmonary tuberculosis patients already on DOTS, in intensive phase. Main outcome measure: Delay in initiation of DOTS & health seeking behavior Results: Median total delay for starting DOTS was 111 days, (range: 10 to 321 days. Patient delay was more than provider delay. Patients delay was more in patients above 60 years, illiterate, per-capita income below 650 Rupees and HIV TB co-infection. Pattern of health seeking behavior was complex. Family physician was the preferred health care provider. Patient visited on an average four providers and spent around 1450 rupees (only direct cost before DOTS begin. Time taken from the onset of symptoms and start of DOT is a cause of concern for the tuberculosis control program. Early case detection is important rather than mere achieving target of 70% new case detection. Program manager needs to implement locally relevant & focused strategies for early case detection to improve the treatment success, especially in rural area of India.

  13. Vehicle barrier with access delay

    Science.gov (United States)

    Swahlan, David J; Wilke, Jason

    2013-09-03

    An access delay vehicle barrier for stopping unauthorized entry into secure areas by a vehicle ramming attack includes access delay features for preventing and/or delaying an adversary from defeating or compromising the barrier. A horizontally deployed barrier member can include an exterior steel casing, an interior steel reinforcing member and access delay members disposed within the casing and between the casing and the interior reinforcing member. Access delay members can include wooden structural lumber, concrete and/or polymeric members that in combination with the exterior casing and interior reinforcing member act cooperatively to impair an adversarial attach by thermal, mechanical and/or explosive tools.

  14. Fundamentals of Delayed Coking Joint Industry Project

    Energy Technology Data Exchange (ETDEWEB)

    Michael Volk Jr; Keith Wisecarver

    2005-10-01

    is 2,937,439 barrels/calendar day. These cokers produce 154,607 tons of coke per day and delayed coking accounts for 88% of the world capacity. The delayed coking charge capacity in the United States is 1,787,860 b/cd. Despite its wide commercial use, only relatively few contractors and refiners are truly knowledgeable in delayed-coking design, so that this process carries with it a ''black art'' connotation. Until recently, the expected yield from cokers was determined by a simple laboratory test on the feedstock. As a result of Tulsa University's prior related research, a process model was developed that with additional work could be used to optimize existing delayed cokers over a wide range of potential feedstocks and operating conditions. The objectives of this research program are to: utilize the current micro, batch and pilot unit facilities at The University of Tulsa to enhance the understanding of the coking process; conduct additional micro and pilot unit tests with new and in-house resids and recycles to make current optimization models more robust; conduct focused kinetic experiments to enhance the furnace tube model and to enhance liquid production while minimizing sulfur in the products; conduct detailed foaming studies to optimize the process and minimize process upsets; quantify the parameters that affect coke morphology; and to utilize the knowledge gained from the experimental and modeling studies to enhance the computer programs developed in the previous JIP for optimization of the coking process. These refined computer models will then be tested against refinery data provided by the member companies. Novel concepts will also be explored for hydrogen sulfide removal of furnace gases as well as gas injection studies to reduce over-cracking. The following deliverables are scheduled from the two projects of the three-year JIP: (1) A novel method for enhancing liquid yields from delayed cokers and data that provide insight as to

  15. Hypothetical intertemporal choice and real economic behavior: delay discounting predicts voucher redemptions during contingency-management procedures.

    Science.gov (United States)

    Bickel, Warren K; Jones, Bryan A; Landes, Reid D; Christensen, Darren R; Jackson, Lisa; Mancino, Michael

    2010-12-01

    Delay discounting rates are predictive of drug use status, the likelihood of becoming abstinent, and a variety of health behaviors. Rates of delay discounting may also be related to other relevant behaviors associated with addiction, such as the frequency at which individuals redeem contingency management voucher earnings. This study examined the discounting rates of 152 participants in a buprenorphine treatment program for opioid abuse. Participants received up to 12 weeks of buprenorphine treatment combined with contingency management. Participant's drug use was measured via urine specimens submitted three times a week. Successive negative urine specimens were reinforced with increasing amounts of money. After each negative urine specimen, a participant could either redeem his or her earnings or accumulate it in an account. Analysis of the frequency of redemptions showed that participants with higher rates of delay discounting at study intake redeemed their earnings significantly more often than participants with lower rates of discounting. Age and income also predicted redemption rates. We suggest that delay discounting rates can be used to predict redemption behaviors in a contingency management treatment program and that these findings are consistent with the recent theory of the competing neurobehavioral decision systems. PsycINFO Database Record (c) 2010 APA, all rights reserved.

  16. Ground-Water Quality Data in the Central Eastside San Joaquin Basin 2006: Results from the California GAMA Program

    Science.gov (United States)

    Landon, Matthew K.; Belitz, Kenneth

    2008-01-01

    Ground-water quality in the approximately 1,695-square-mile Central Eastside study unit (CESJO) was investigated from March through June 2006 as part of the Statewide Basin Assessment Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The GAMA Statewide Basin Assessment project was developed in response to the Groundwater Quality Monitoring Act of 2001 and is being conducted by the California State Water Resources Control Board (SWRCB) in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory (LLNL). The study was designed to provide a spatially unbiased assessment of raw ground-water quality within CESJO, as well as a statistically consistent basis for comparing water quality throughout California. Samples were collected from 78 wells in Merced and Stanislaus Counties. Fifty-eight of the 78 wells were selected using a randomized grid-based method to provide statistical representation of the study unit (grid wells). Twenty of the wells were selected to evaluate changes in water chemistry along selected lateral or vertical ground-water flow paths in the aquifer (flow-path wells). The ground-water samples were analyzed for a large number of synthetic organic constituents [volatile organic compounds (VOCs), gasoline oxygenates and their degradates, pesticides and pesticide degradates], constituents of special interest [perchlorate, N-nitrosodimethylamine (NDMA), and 1,2,3-trichloropropane (1,2,3-TCP)], inorganic constituents that can occur naturally [nutrients, major and minor ions, and trace elements], radioactive constituents, and microbial indicators. Naturally occurring isotopes [tritium, carbon-14, and uranium isotopes and stable isotopes of hydrogen, oxygen, nitrogen, sulfur, and carbon], and dissolved noble and other gases also were measured to help identify the source and age of the sampled ground water. Quality-control samples (blanks, replicates, samples for matrix spikes) were collected

  17. Communication Delays in the Cooperative Control of Wide Area Search Munitions Via Iterative Network Flow

    National Research Council Canada - National Science Library

    Mitchell, Jason

    2003-01-01

    .... This model is used to study the effect of communication delays on the performance of an iteractive network flow optimization model that results in a sequence of linear programs for the optimal...

  18. Precise delay measurement through combinatorial logic

    Science.gov (United States)

    Burke, Gary R. (Inventor); Chen, Yuan (Inventor); Sheldon, Douglas J. (Inventor)

    2010-01-01

    A high resolution circuit and method for facilitating precise measurement of on-chip delays for FPGAs for reliability studies. The circuit embeds a pulse generator on an FPGA chip having one or more groups of LUTS (the "LUT delay chain"), also on-chip. The circuit also embeds a pulse width measurement circuit on-chip, and measures the duration of the generated pulse through the delay chain. The pulse width of the output pulse represents the delay through the delay chain without any I/O delay. The pulse width measurement circuit uses an additional asynchronous clock autonomous from the main clock and the FPGA propagation delay can be displayed on a hex display continuously for testing purposes.

  19. The ground support computer and in-orbit survey data analysis program for the SEEP experiment

    International Nuclear Information System (INIS)

    Voss, H.D.; Datlowe, D.W.; Mobilia, J.; Roselle, S.N.

    1985-01-01

    The ground support computer equipment (GSE) and production survey plot and analysis software are described for the Stimulated Emissions of Energetic Particles (SEEP) experiment on the S81-1 satellite. A general purpose satellite data acquisition circuit was developed based on a Z-80 portable microcomputer. By simply changing instrument control software and electrical connectors, automatic testing and control of the various SEEP instruments was accomplished. A new feature incorporated into the SEEP data analysis phase was the development of a correlative data base for all of the SEEP instruments. A CPU efficient survey plot program (with ephemeris) was developed to display the approximate 3100 hours of data, with a time resolution of 0.5 sec, from the ten instrument sensors. The details of the general purpose multigraph algorithms and plot formats are presented. For the first time new associations are being investigated of simultaneous particle, X-ray, optical and plasma density satellite measurements

  20. Improving Delay-Range-Dependent Stability Condition for Systems with Interval Time-Varying Delay

    Directory of Open Access Journals (Sweden)

    Wei Qian

    2013-01-01

    Full Text Available This paper discusses the delay-range-dependent stability for systems with interval time-varying delay. Through defining the new Lyapunov-Krasovskii functional and estimating the derivative of the LKF by introducing new vectors, using free matrices and reciprocally convex approach, the new delay-range-dependent stability conditions are obtained. Two well-known examples are given to illustrate the less conservatism of the proposed theoretical results.

  1. Hanford Site ground-water monitoring for 1994

    International Nuclear Information System (INIS)

    Dresel, P.E.; Thorne, P.D.; Luttrell, S.P.

    1995-08-01

    This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1994 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiologic and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1994 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site's geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1993 and June 1994. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal

  2. Hanford Site ground-water monitoring for 1994

    Energy Technology Data Exchange (ETDEWEB)

    Dresel, P.E.; Thorne, P.D.; Luttrell, S.P. [and others

    1995-08-01

    This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1994 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiologic and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1994 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site`s geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1993 and June 1994. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal.

  3. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  4. Modeling of delays in PKPD: classical approaches and a tutorial for delay differential equations.

    Science.gov (United States)

    Koch, Gilbert; Krzyzanski, Wojciech; Pérez-Ruixo, Juan Jose; Schropp, Johannes

    2014-08-01

    In pharmacokinetics/pharmacodynamics (PKPD) the measured response is often delayed relative to drug administration, individuals in a population have a certain lifespan until they maturate or the change of biomarkers does not immediately affects the primary endpoint. The classical approach in PKPD is to apply transit compartment models (TCM) based on ordinary differential equations to handle such delays. However, an alternative approach to deal with delays are delay differential equations (DDE). DDEs feature additional flexibility and properties, realize more complex dynamics and can complementary be used together with TCMs. We introduce several delay based PKPD models and investigate mathematical properties of general DDE based models, which serve as subunits in order to build larger PKPD models. Finally, we review current PKPD software with respect to the implementation of DDEs for PKPD analysis.

  5. A delay fractioning approach to global synchronization of delayed complex networks with stochastic disturbances

    International Nuclear Information System (INIS)

    Wang Yao; Wang Zidong; Liang Jinling

    2008-01-01

    In this Letter, the synchronization problem is investigated for a class of stochastic complex networks with time delays. By utilizing a new Lyapunov functional form based on the idea of 'delay fractioning', we employ the stochastic analysis techniques and the properties of Kronecker product to establish delay-dependent synchronization criteria that guarantee the globally asymptotically mean-square synchronization of the addressed delayed networks with stochastic disturbances. These sufficient conditions, which are formulated in terms of linear matrix inequalities (LMIs), can be solved efficiently by the LMI toolbox in Matlab. The main results are proved to be much less conservative and the conservatism could be reduced further as the number of delay fractioning gets bigger. A simulation example is exploited to demonstrate the advantage and applicability of the proposed result

  6. A distributed delay approach for modeling delayed outcomes in pharmacokinetics and pharmacodynamics studies.

    Science.gov (United States)

    Hu, Shuhua; Dunlavey, Michael; Guzy, Serge; Teuscher, Nathan

    2018-04-01

    A distributed delay approach was proposed in this paper to model delayed outcomes in pharmacokinetics and pharmacodynamics studies. This approach was shown to be general enough to incorporate a wide array of pharmacokinetic and pharmacodynamic models as special cases including transit compartment models, effect compartment models, typical absorption models (either zero-order or first-order absorption), and a number of atypical (or irregular) absorption models (e.g., parallel first-order, mixed first-order and zero-order, inverse Gaussian, and Weibull absorption models). Real-life examples were given to demonstrate how to implement distributed delays in Phoenix ® NLME™ 8.0, and to numerically show the advantages of the distributed delay approach over the traditional methods.

  7. Novel delay-distribution-dependent stability analysis for continuous-time recurrent neural networks with stochastic delay

    International Nuclear Information System (INIS)

    Wang Shen-Quan; Feng Jian; Zhao Qing

    2012-01-01

    In this paper, the problem of delay-distribution-dependent stability is investigated for continuous-time recurrent neural networks (CRNNs) with stochastic delay. Different from the common assumptions on time delays, it is assumed that the probability distribution of the delay taking values in some intervals is known a priori. By making full use of the information concerning the probability distribution of the delay and by using a tighter bounding technique (the reciprocally convex combination method), less conservative asymptotic mean-square stable sufficient conditions are derived in terms of linear matrix inequalities (LMIs). Two numerical examples show that our results are better than the existing ones. (general)

  8. Analytic game—theoretic approach to ground-water extraction

    Science.gov (United States)

    Loáiciga, Hugo A.

    2004-09-01

    The roles of cooperation and non-cooperation in the sustainable exploitation of a jointly used groundwater resource have been quantified mathematically using an analytical game-theoretic formulation. Cooperative equilibrium arises when ground-water users respect water-level constraints and consider mutual impacts, which allows them to derive economic benefits from ground-water indefinitely, that is, to achieve sustainability. This work shows that cooperative equilibrium can be obtained from the solution of a quadratic programming problem. For cooperative equilibrium to hold, however, enforcement must be effective. Otherwise, according to the commonized costs-privatized profits paradox, there is a natural tendency towards non-cooperation and non-sustainable aquifer mining, of which overdraft is a typical symptom. Non-cooperative behavior arises when at least one ground-water user neglects the externalities of his adopted ground-water pumping strategy. In this instance, water-level constraints may be violated in a relatively short time and the economic benefits from ground-water extraction fall below those obtained with cooperative aquifer use. One example illustrates the game theoretic approach of this work.

  9. Time Delay of CGM Sensors

    Science.gov (United States)

    Schmelzeisen-Redeker, Günther; Schoemaker, Michael; Kirchsteiger, Harald; Freckmann, Guido; Heinemann, Lutz; del Re, Luigi

    2015-01-01

    Background: Continuous glucose monitoring (CGM) is a powerful tool to support the optimization of glucose control of patients with diabetes. However, CGM systems measure glucose in interstitial fluid but not in blood. Rapid changes in one compartment are not accompanied by similar changes in the other, but follow with some delay. Such time delays hamper detection of, for example, hypoglycemic events. Our aim is to discuss the causes and extent of time delays and approaches to compensate for these. Methods: CGM data were obtained in a clinical study with 37 patients with a prototype glucose sensor. The study was divided into 5 phases over 2 years. In all, 8 patients participated in 2 phases separated by 8 months. A total number of 108 CGM data sets including raw signals were used for data analysis and were processed by statistical methods to obtain estimates of the time delay. Results: Overall mean (SD) time delay of the raw signals with respect to blood glucose was 9.5 (3.7) min, median was 9 min (interquartile range 4 min). Analysis of time delays observed in the same patients separated by 8 months suggests a patient dependent delay. No significant correlation was observed between delay and anamnestic or anthropometric data. The use of a prediction algorithm reduced the delay by 4 minutes on average. Conclusions: Prediction algorithms should be used to provide real-time CGM readings more consistent with simultaneous measurements by SMBG. Patient specificity may play an important role in improving prediction quality. PMID:26243773

  10. Delay-Dependent Guaranteed Cost Control of an Interval System with Interval Time-Varying Delay

    Directory of Open Access Journals (Sweden)

    Xiao Min

    2009-01-01

    Full Text Available This paper concerns the problem of the delay-dependent robust stability and guaranteed cost control for an interval system with time-varying delay. The interval system with matrix factorization is provided and leads to less conservative conclusions than solving a square root. The time-varying delay is assumed to belong to an interval and the derivative of the interval time-varying delay is not a restriction, which allows a fast time-varying delay; also its applicability is broad. Based on the Lyapunov-Ktasovskii approach, a delay-dependent criterion for the existence of a state feedback controller, which guarantees the closed-loop system stability, the upper bound of cost function, and disturbance attenuation lever for all admissible uncertainties as well as out perturbation, is proposed in terms of linear matrix inequalities (LMIs. The criterion is derived by free weighting matrices that can reduce the conservatism. The effectiveness has been verified in a number example and the compute results are presented to validate the proposed design method.

  11. Delay-Dependent Control for Networked Control Systems with Large Delays

    Directory of Open Access Journals (Sweden)

    Yilin Wang

    2013-01-01

    Full Text Available We consider the problems of robust stability and control for a class of networked control systems with long-time delays. Firstly, a nonlinear discrete time model with mode-dependent time delays is proposed by converting the uncertainty of time delay into the uncertainty of parameter matrices. We consider a probabilistic case where the system is switched among different subsystems, and the probability of each subsystem being active is defined as its occurrence probability. For a switched system with a known subsystem occurrence probabilities, we give a stochastic stability criterion in terms of linear matrix inequalities (LMIs. Then, we extend the results to a more practical case where the subsystem occurrence probabilities are uncertain. Finally, a simulation example is presented to show the efficacy of the proposed method.

  12. Ground water work breakdown structure dictionary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This report contains the activities that are necessary to assess in ground water remediation as specified in the UMTRA Project. These activities include the following: site characterization; remedial action compliance and design documentation; environment, health, and safety program; technology assessment; property access and acquisition activities; site remedial actions; long term surveillance and licensing; and technical and management support.

  13. Ground water work breakdown structure dictionary

    International Nuclear Information System (INIS)

    1995-04-01

    This report contains the activities that are necessary to assess in ground water remediation as specified in the UMTRA Project. These activities include the following: site characterization; remedial action compliance and design documentation; environment, health, and safety program; technology assessment; property access and acquisition activities; site remedial actions; long term surveillance and licensing; and technical and management support

  14. MODFLOW-2000, The U.S. Geological Survey Modular Ground-Water Model - User Guide to Modularization Concepts and the Ground-Water Flow Process

    Science.gov (United States)

    Harbaugh, Arlen W.; Banta, Edward R.; Hill, Mary C.; McDonald, Michael G.

    2000-01-01

    MODFLOW is a computer program that numerically solves the three-dimensional ground-water flow equation for a porous medium by using a finite-difference method. Although MODFLOW was designed to be easily enhanced, the design was oriented toward additions to the ground-water flow equation. Frequently there is a need to solve additional equations; for example, transport equations and equations for estimating parameter values that produce the closest match between model-calculated heads and flows and measured values. This report documents a new version of MODFLOW, called MODFLOW-2000, which is designed to accommodate the solution of equations in addition to the ground-water flow equation. This report is a user's manual. It contains an overview of the old and added design concepts, documents one new package, and contains input instructions for using the model to solve the ground-water flow equation.

  15. Developmental delay in the Amazon: The social determinants and prevalence among rural communities in Peru.

    Science.gov (United States)

    Westgard, Christopher; Alnasser, Yossef

    2017-01-01

    The consequences of poor child development are becoming increasingly recognized. Programs are being put in place around the world to improve child development by providing healthy and stimulating environments for children. However, these programs often have limited reach and little is known about the prevalence of developmental delay in under-developed communities. The current study set-out to better understand the prevalence of developmental delay in rural communities in the Amazon region of Peru. Also, it explores social determinants that are associated with any delay. Cross-sectional study by evaluating developmental delay in children under 4 years utilizing Ages and Stages Questionnaire (ASQ-3). Additionally, conducting a social determinants questionnaire answered by caretakers to identify social drivers for developmental delay. The data was analyzed with multi-variant analysis to measure association. The prevalence of developmental delay in the Amazonian communities was 26.7% (19.3% in communication, 11.4% in gross motor skills, 8% in both) (N = 596). The multivariate logistic regression analysis revealed significant associations between developmental delay and; level of education (OR 0.64, p = 0.009), age of mother during child's birth (OR 0.96, p = 0.002), visits by community health agents (OR 0.73, p = 0.013), and river as primary water source (OR 2.39, p = 0.001). The social determinants questionnaire revealed that 39% of the mothers had their first child before the age of 17, nearly half stopped going to school before the age of 12 (52%), 29% gave birth at home, 13% breast fed for less than 7 months, and 50% of the children had diarrhea in the last month. There is still a great need to improve the conditions for child development in the Amazon region of Peru. One-fourth of the children suffer from developmental delay, which will likely impede their potentials for life unless something is done. The impact of education, age of mother at birth of the child

  16. Developmental delay in the Amazon: The social determinants and prevalence among rural communities in Peru.

    Directory of Open Access Journals (Sweden)

    Christopher Westgard

    Full Text Available The consequences of poor child development are becoming increasingly recognized. Programs are being put in place around the world to improve child development by providing healthy and stimulating environments for children. However, these programs often have limited reach and little is known about the prevalence of developmental delay in under-developed communities. The current study set-out to better understand the prevalence of developmental delay in rural communities in the Amazon region of Peru. Also, it explores social determinants that are associated with any delay. Cross-sectional study by evaluating developmental delay in children under 4 years utilizing Ages and Stages Questionnaire (ASQ-3. Additionally, conducting a social determinants questionnaire answered by caretakers to identify social drivers for developmental delay. The data was analyzed with multi-variant analysis to measure association. The prevalence of developmental delay in the Amazonian communities was 26.7% (19.3% in communication, 11.4% in gross motor skills, 8% in both (N = 596. The multivariate logistic regression analysis revealed significant associations between developmental delay and; level of education (OR 0.64, p = 0.009, age of mother during child's birth (OR 0.96, p = 0.002, visits by community health agents (OR 0.73, p = 0.013, and river as primary water source (OR 2.39, p = 0.001. The social determinants questionnaire revealed that 39% of the mothers had their first child before the age of 17, nearly half stopped going to school before the age of 12 (52%, 29% gave birth at home, 13% breast fed for less than 7 months, and 50% of the children had diarrhea in the last month. There is still a great need to improve the conditions for child development in the Amazon region of Peru. One-fourth of the children suffer from developmental delay, which will likely impede their potentials for life unless something is done. The impact of education, age of mother at birth of

  17. Human fMRI reveals that delayed action re-recruits visual perception.

    Science.gov (United States)

    Singhal, Anthony; Monaco, Simona; Kaufman, Liam D; Culham, Jody C

    2013-01-01

    Behavioral and neuropsychological research suggests that delayed actions rely on different neural substrates than immediate actions; however, the specific brain areas implicated in the two types of actions remain unknown. We used functional magnetic resonance imaging (fMRI) to measure human brain activation during delayed grasping and reaching. Specifically, we examined activation during visual stimulation and action execution separated by a 18-s delay interval in which subjects had to remember an intended action toward the remembered object. The long delay interval enabled us to unambiguously distinguish visual, memory-related, and action responses. Most strikingly, we observed reactivation of the lateral occipital complex (LOC), a ventral-stream area implicated in visual object recognition, and early visual cortex (EVC) at the time of action. Importantly this reactivation was observed even though participants remained in complete darkness with no visual stimulation at the time of the action. Moreover, within EVC, higher activation was observed for grasping than reaching during both vision and action execution. Areas in the dorsal visual stream were activated during action execution as expected and, for some, also during vision. Several areas, including the anterior intraparietal sulcus (aIPS), dorsal premotor cortex (PMd), primary motor cortex (M1) and the supplementary motor area (SMA), showed sustained activation during the delay phase. We propose that during delayed actions, dorsal-stream areas plan and maintain coarse action goals; however, at the time of execution, motor programming requires re-recruitment of detailed visual information about the object through reactivation of (1) ventral-stream areas involved in object perception and (2) early visual areas that contain richly detailed visual representations, particularly for grasping.

  18. Human fMRI reveals that delayed action re-recruits visual perception.

    Directory of Open Access Journals (Sweden)

    Anthony Singhal

    Full Text Available Behavioral and neuropsychological research suggests that delayed actions rely on different neural substrates than immediate actions; however, the specific brain areas implicated in the two types of actions remain unknown. We used functional magnetic resonance imaging (fMRI to measure human brain activation during delayed grasping and reaching. Specifically, we examined activation during visual stimulation and action execution separated by a 18-s delay interval in which subjects had to remember an intended action toward the remembered object. The long delay interval enabled us to unambiguously distinguish visual, memory-related, and action responses. Most strikingly, we observed reactivation of the lateral occipital complex (LOC, a ventral-stream area implicated in visual object recognition, and early visual cortex (EVC at the time of action. Importantly this reactivation was observed even though participants remained in complete darkness with no visual stimulation at the time of the action. Moreover, within EVC, higher activation was observed for grasping than reaching during both vision and action execution. Areas in the dorsal visual stream were activated during action execution as expected and, for some, also during vision. Several areas, including the anterior intraparietal sulcus (aIPS, dorsal premotor cortex (PMd, primary motor cortex (M1 and the supplementary motor area (SMA, showed sustained activation during the delay phase. We propose that during delayed actions, dorsal-stream areas plan and maintain coarse action goals; however, at the time of execution, motor programming requires re-recruitment of detailed visual information about the object through reactivation of (1 ventral-stream areas involved in object perception and (2 early visual areas that contain richly detailed visual representations, particularly for grasping.

  19. Evaluation of two transport aircraft and several ground test vehicle friction measurements obtained for various runway surface types and conditions. A summary of test results from joint FAA/NASA Runway Friction Program

    Science.gov (United States)

    Yager, Thomas J.; Vogler, William A.; Baldasare, Paul

    1990-01-01

    Tests with specially instrumented NASA Boeing 737 and 727 aircraft together with several different ground friction measuring devices were conducted for a variety of runway surface types and conditions. These tests are part of joint FAA/NASA Aircraft/Ground Vehicle Runway Friction Program aimed at obtaining a better understanding of aircraft ground handling performance under adverse weather conditions and defining relationships between aircraft and ground vehicle tire friction measurements. Aircraft braking performance on dry, wet, snow and ice-covered runway conditions is discussed as well as ground vehicle friction data obtained under similar runway conditions. For a given contaminated runway surface condition, the correlation between ground vehicles and aircraft friction data is identified. The influence of major test parameters on friction measurements such as speed, test tire characteristics, type and amount of surface contaminant, and ambient temperature are discussed. The effect of surface type on wet friction levels is also evaluated from comparative data collected on grooved and ungrooved concrete and asphalt surfaces.

  20. UAVs and Control Delays

    National Research Council Canada - National Science Library

    de Vries, S. C

    2005-01-01

    .... Delays of about 250-300 ms often lead to unacceptable airplane handling qualities. Techniques such as filtering and predictive displays may extend the range of acceptable delays up to about 400 ms...

  1. Analytical applications for delayed neutrons

    International Nuclear Information System (INIS)

    Eccleston, G.W.

    1983-01-01

    Analytical formulations that describe the time dependence of neutron populations in nuclear materials contain delayed-neutron dependent terms. These terms are important because the delayed neutrons, even though their yields in fission are small, permit control of the fission chain reaction process. Analytical applications that use delayed neutrons range from simple problems that can be solved with the point reactor kinetics equations to complex problems that can only be solved with large codes that couple fluid calculations with the neutron dynamics. Reactor safety codes, such as SIMMER, model transients of the entire reactor core using coupled space-time neutronics and comprehensive thermal-fluid dynamics. Nondestructive delayed-neutron assay instruments are designed and modeled using a three-dimensional continuous-energy Monte Carlo code. Calculations on high-burnup spent fuels and other materials that contain a mix of uranium and plutonium isotopes require accurate and complete information on the delayed-neutron periods, yields, and energy spectra. A continuing need exists for delayed-neutron parameters for all the fissioning isotopes

  2. 49 CFR 236.563 - Delay time.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Delay time. 236.563 Section 236.563 Transportation... Cab Signal Systems Rules and Instructions; Locomotives § 236.563 Delay time. Delay time of automatic... requirements of § 236.24 shall take into consideration the delay time. ...

  3. Delayed puberty in boys

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/article/007695.htm Delayed puberty in boys To use the sharing features on this page, please enable JavaScript. Delayed puberty in boys is when puberty does not begin ...

  4. Delay-range-dependent exponential H∞ synchronization of a class of delayed neural networks

    International Nuclear Information System (INIS)

    Karimi, Hamid Reza; Maass, Peter

    2009-01-01

    This article aims to present a multiple delayed state-feedback control design for exponential H ∞ synchronization problem of a class of delayed neural networks with multiple time-varying discrete delays. On the basis of the drive-response concept and by introducing a descriptor technique and using Lyapunov-Krasovskii functional, new delay-range-dependent sufficient conditions for exponential H ∞ synchronization of the drive-response structure of neural networks are driven in terms of linear matrix inequalities (LMIs). The explicit expression of the controller gain matrices are parameterized based on the solvability conditions such that the drive system and the response system can be exponentially synchronized. A numerical example is included to illustrate the applicability of the proposed design method.

  5. New Results on Passivity Analysis of Stochastic Neural Networks with Time-Varying Delay and Leakage Delay

    Directory of Open Access Journals (Sweden)

    YaJun Li

    2015-01-01

    Full Text Available The passivity problem for a class of stochastic neural networks systems (SNNs with varying delay and leakage delay has been further studied in this paper. By constructing a more effective Lyapunov functional, employing the free-weighting matrix approach, and combining with integral inequality technic and stochastic analysis theory, the delay-dependent conditions have been proposed such that SNNs are asymptotically stable with guaranteed performance. The time-varying delay is divided into several subintervals and two adjustable parameters are introduced; more information about time delay is utilised and less conservative results have been obtained. Examples are provided to illustrate the less conservatism of the proposed method and simulations are given to show the impact of leakage delay on stability of SNNs.

  6. Predicting the Pullout Capacity of Small Ground Anchors Using Nonlinear Integrated Computing Techniques

    Directory of Open Access Journals (Sweden)

    Mosbeh R. Kaloop

    2017-01-01

    Full Text Available This study investigates predicting the pullout capacity of small ground anchors using nonlinear computing techniques. The input-output prediction model for the nonlinear Hammerstein-Wiener (NHW and delay inputs for the adaptive neurofuzzy inference system (DANFIS are developed and utilized to predict the pullout capacity. The results of the developed models are compared with previous studies that used artificial neural networks and least square support vector machine techniques for the same case study. The in situ data collection and statistical performances are used to evaluate the models performance. Results show that the developed models enhance the precision of predicting the pullout capacity when compared with previous studies. Also, the DANFIS model performance is proven to be better than other models used to detect the pullout capacity of ground anchors.

  7. Discounting of Monetary Rewards that are Both Delayed and Probabilistic: Delay and Probability Combine Multiplicatively, not Additively

    Science.gov (United States)

    Vanderveldt, Ariana; Green, Leonard; Myerson, Joel

    2014-01-01

    The value of an outcome is affected both by the delay until its receipt (delay discounting) and by the likelihood of its receipt (probability discounting). Despite being well-described by the same hyperboloid function, delay and probability discounting involve fundamentally different processes, as revealed, for example, by the differential effects of reward amount. Previous research has focused on the discounting of delayed and probabilistic rewards separately, with little research examining more complex situations in which rewards are both delayed and probabilistic. In two experiments, participants made choices between smaller rewards that were both immediate and certain and larger rewards that were both delayed and probabilistic. Analyses revealed significant interactions between delay and probability factors inconsistent with an additive model. In contrast, a hyperboloid discounting model in which delay and probability were combined multiplicatively provided an excellent fit to the data. These results suggest that the hyperboloid is a good descriptor of decision making in complicated monetary choice situations like those people encounter in everyday life. PMID:24933696

  8. Aircraft and ground vehicle friction measurements obtained under winter runway conditions

    Science.gov (United States)

    Yager, Thomas J.

    1989-01-01

    Tests with specially instrumented NASA B-737 and B-727 aircraft together with several different ground friction measuring devices have been conducted for a variety of runway surface types and wetness conditions. This effort is part of the Joint FAA/NASA Aircraft/Ground Vehicle Runway Friction Program aimed at obtaining a better understanding of aircraft ground handling performance under adverse weather conditions, and defining relationships between aircraft and ground vehicle tire friction measurements. Aircraft braking performance on dry, wet, snow-, and ice-covered runway conditions is discussed together with ground vehicle friction data obtained under similar runway conditions. For the wet, compacted snow- and ice-covered runway conditions, the relationship between ground vehicles and aircraft friction data is identified. The influence of major test parameters on friction measurements such as speed, test tire characteristics, and surface contaminant-type are discussed. The test results indicate that use of properly maintained and calibrated ground vehicles for monitoring runway friction conditions should be encouraged particularly under adverse weather conditions.

  9. Beta-decay rate and beta-delayed neutron emission probability of improved gross theory

    Science.gov (United States)

    Koura, Hiroyuki

    2014-09-01

    A theoretical study has been carried out on beta-decay rate and beta-delayed neutron emission probability. The gross theory of the beta decay is based on an idea of the sum rule of the beta-decay strength function, and has succeeded in describing beta-decay half-lives of nuclei overall nuclear mass region. The gross theory includes not only the allowed transition as the Fermi and the Gamow-Teller, but also the first-forbidden transition. In this work, some improvements are introduced as the nuclear shell correction on nuclear level densities and the nuclear deformation for nuclear strength functions, those effects were not included in the original gross theory. The shell energy and the nuclear deformation for unmeasured nuclei are adopted from the KTUY nuclear mass formula, which is based on the spherical-basis method. Considering the properties of the integrated Fermi function, we can roughly categorized energy region of excited-state of a daughter nucleus into three regions: a highly-excited energy region, which fully affect a delayed neutron probability, a middle energy region, which is estimated to contribute the decay heat, and a region neighboring the ground-state, which determines the beta-decay rate. Some results will be given in the presentation. A theoretical study has been carried out on beta-decay rate and beta-delayed neutron emission probability. The gross theory of the beta decay is based on an idea of the sum rule of the beta-decay strength function, and has succeeded in describing beta-decay half-lives of nuclei overall nuclear mass region. The gross theory includes not only the allowed transition as the Fermi and the Gamow-Teller, but also the first-forbidden transition. In this work, some improvements are introduced as the nuclear shell correction on nuclear level densities and the nuclear deformation for nuclear strength functions, those effects were not included in the original gross theory. The shell energy and the nuclear deformation for

  10. Modelling the Costs and Benefits of Delayed Product Differentiation

    OpenAIRE

    Hau L. Lee; Christopher S. Tang

    1997-01-01

    Expanding product variety and high customer service provision are both major challenges for manufacturers to compete in the global market. In addition to many ongoing programs, such as lead-time reduction, redesigning products and processes so as to delay the point of product differentiation is becoming an emerging means to address these challenges. Such a strategy calls for redesigning products and processes so that the stages of the production process in which a common process is used are p...

  11. Delayed enhanced MRI in intraparenchymal tumors

    International Nuclear Information System (INIS)

    Eguchi, Takahiko; Morimoto, Tetsuya; Takeshima, Toshikazu

    1991-01-01

    Delayed enhanced MRI was performed on 20 intraparenchymal tumors, and these findings were compared with those of early enhanced MRI. Using the spin-echo technique (SE: 400-500/20 msec), early scans were obtained 5 minutes, and delayed scans were obtained 60 minutes, after the intravenous injection of 0.1 nmol of gadolinium-DTPA/Kg. We discussed the changes in the delayed scan with regard to the change in the pattern of enhancement and the boundary of enhancement. In these twenty intraparenchymal tumors, there were three low-grade astrocytomas, two anaplastic astrocytomas, seven glioblastomas, and eight metastatic tumors. The changes in the enhanced pattern showed three types as follows: Type I: heterogeneous enhancement in both early and delayed scans; Type II: heterogeneous enhancement in early scan and homogeneous enhancement in delayed scan; Type III: homogeneous enhancement in both early and delayed scans. Most malignant tumors, such as glioblastomas (6/8), anaplastic astrocytomas (2/2), and metastatic tumors (7/8), revealed Type I, although low-grade astrocytomas showed Type II (3/2) and Type III (1/3). The heterogeneous enhancement in delayed scan was found in malignant tumors and in low-grade astrocytoma; even if the early scan revealed heterogeneous enhancement, the delayed scan showed homogeneous enhancement. In the delayed scan, most enhanced boundaries spread out of the boundaries in the early scan. Glioblastomas spread markedly in the delayed scan, although none of the low-grade astrocytomas, anaplastic astrocytomas, or metastases revealed marked spreading. We called these marked increases in the delayed scan a 'spreading sign' and thought that this sign was specific to glioblastomas. Recently some authors have emphasized the usefulness of serial scans. Delayed enhanced MRI 60 minutes after the administration of a contrast medium was here found also to be useful for the accurate diagnosis for brain tumors. (author)

  12. SP-100 Program overview

    International Nuclear Information System (INIS)

    Truscello, V.C.

    1984-01-01

    The SP-100 Program is expected to go through three phases: technology assessment and advancement, ground testing, and flight qualification. Currently the program is in the two- to three-year technology assessment and advancement stage. Goals are to identify the space nuclear power system concept that best meets anticipated requirements of future space missions, assess the technical feasibility of that concept, and establish a cost and schedule for developing the concept. The SP-100 Project Office has begun the implementation activities needed to meet these goals. With regard to refractory alloys, a better data base will be required before we move ahead in the program from technology assessment to ground demonstration

  13. Project delay analysis of HRSG

    Science.gov (United States)

    Silvianita; Novega, A. S.; Rosyid, D. M.; Suntoyo

    2017-08-01

    Completion of HRSG (Heat Recovery Steam Generator) fabrication project sometimes is not sufficient with the targeted time written on the contract. The delay on fabrication process can cause some disadvantages for fabricator, including forfeit payment, delay on HRSG construction process up until HRSG trials delay. In this paper, the author is using semi quantitative on HRSG pressure part fabrication delay with configuration plant 1 GT (Gas Turbine) + 1 HRSG + 1 STG (Steam Turbine Generator) using bow-tie analysis method. Bow-tie analysis method is a combination from FTA (Fault tree analysis) and ETA (Event tree analysis) to develop the risk matrix of HRSG. The result from FTA analysis is use as a threat for preventive measure. The result from ETA analysis is use as impact from fabrication delay.

  14. Nonlinear delay monopoly with bounded rationality

    International Nuclear Information System (INIS)

    Matsumoto, Akio; Szidarovszky, Ferenc

    2012-01-01

    The purpose of this paper is to study the dynamics of a monopolistic firm in a continuous-time framework. The firm is assumed to be boundedly rational and to experience time delays in obtaining and implementing information on output. The dynamic adjustment process is based on the gradient of the expected profit. The paper is divided into three parts: we examine delay effects on dynamics caused by one-time delay and two-time delays in the first two parts. Global dynamics and analytical results on local dynamics are numerically confirmed in the third part. Four main results are demonstrated. First, the stability switch from stability to instability occurs only once in the case of a single delay. Second, the alternation of stability and instability can continue if two time delays are involved. Third, the occurence of Hopf bifurcation is analytically shown if stability is lost. Finally, in a bifurcation process, there are a period-doubling cascade to chaos and a period-halving cascade to the equilibrium point in the case of two time delays if the difference between the two delays is large.

  15. Long-term ground-water monitoring program and performance-evaluation plan for the extraction system at the former Nike Missile Battery Site, Aberdeen Proving Ground, Maryland

    Science.gov (United States)

    Senus, Michael P.; Tenbus, Frederick J.

    2000-01-01

    This report presents lithologic and ground-water-quality data collected during April and May 2000 in the remote areas of the tidal wetland of West Branch Canal Creek, Aberdeen Proving Ground, Maryland. Contamination of the Canal Creek aquifer with volatile organic compounds has been documented in previous investigations of the area. This study was conducted to investigate areas that were previously inaccessible because of deep mud and shallow water, and to support ongoing investigations of the fate and transport of volatile organic compounds in the Canal Creek aquifer. A unique vibracore drill rig mounted on a hovercraft was used for drilling and ground-water sampling. Continuous cores of the wetland sediment and of the Canal Creek aquifer were collected at five sites. Attempts to sample ground water were made by use of a continuous profiler at 12 sites, without well installation, at a total of 81 depths within the aquifer. Of those 81 attempts, only 34 sampling depths produced enough water to collect samples. Ground-water samples from two sites had the highest concentrations of volatile organic compounds?with total volatile organic compound concentrations in the upper part of the aquifer ranging from about 15,000 to 50,000 micrograms per liter. Ground-water samples from five sites had much lower total volatile organic compound concentrations (95 to 2,100 micrograms per liter), whereas two sites were essentially not contaminated, with total volatile organic compound concentrations less than or equal to 5 micrograms per liter.

  16. Memorized discrete systems and time-delay

    CERN Document Server

    Luo, Albert C J

    2017-01-01

    This book examines discrete dynamical systems with memory—nonlinear systems that exist extensively in biological organisms and financial and economic organizations, and time-delay systems that can be discretized into the memorized, discrete dynamical systems. It book further discusses stability and bifurcations of time-delay dynamical systems that can be investigated through memorized dynamical systems as well as bifurcations of memorized nonlinear dynamical systems, discretization methods of time-delay systems, and periodic motions to chaos in nonlinear time-delay systems. The book helps readers find analytical solutions of MDS, change traditional perturbation analysis in time-delay systems, detect motion complexity and singularity in MDS; and determine stability, bifurcation, and chaos in any time-delay system.

  17. Vernier Delay Unit

    International Nuclear Information System (INIS)

    Pierce, W.B.

    1984-10-01

    This module will accept differential ECL pulses from the auxiliary rear panel or NIM level pulses from the front panel. The pulses are produced at the output with a fixed delay that is software programmable in steps of 0.1 ns over the range of 0.1 to 10.5 ns. Multiple outputs are available at the front panel. Minimum delay through the module is 9 ns

  18. Joint NASA/USAF Airborne Field Mill Program - Operation and safety considerations during flights of a Lear 28 airplane in adverse weather

    Science.gov (United States)

    Fisher, Bruce D.; Phillips, Michael R.; Maier, Launa M.

    1992-01-01

    A NASA Langley Research Center Learjet 28 research airplane was flown in various adverse weather conditions in the vicinity of the NASA Kennedy Space Center from 1990-1992 to measure airborne electric fields during the Joint NASA/USAF Airborne Field Mill Program. The objective of this program was to characterize the electrical activity in various weather phenomena common to the NASA-Kennedy area in order to refine Launch Commit Criteria for natural and triggered lightning. The purpose of the program was to safely relax the existing launch commit criteria, thereby increasing launch availability and reducing the chance for weather holds and delays. This paper discusses the operational conduct of the flight test, including environmental/safety considerations, aircraft instrumentation and modification, test limitations, flight procedures, and the procedures and responsibilities of the personnel in the ground station. Airborne field mill data were collected for all the Launch Commit Criteria during two summer and two winter deployments. These data are now being analyzed.

  19. Ares I-X Ground Diagnostic Prototype

    Science.gov (United States)

    Schwabacher, Mark A.; Martin, Rodney Alexander; Waterman, Robert D.; Oostdyk, Rebecca Lynn; Ossenfort, John P.; Matthews, Bryan

    2010-01-01

    The automation of pre-launch diagnostics for launch vehicles offers three potential benefits: improving safety, reducing cost, and reducing launch delays. The Ares I-X Ground Diagnostic Prototype demonstrated anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage Thrust Vector Control and for the associated ground hydraulics while the vehicle was in the Vehicle Assembly Building at Kennedy Space Center (KSC) and while it was on the launch pad. The prototype combines three existing tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool from Qualtech Systems Inc. for fault isolation and diagnostics. The second tool, SHINE (Spacecraft Health Inference Engine), is a rule-based expert system that was developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification, and used the outputs of SHINE as inputs to TEAMS. The third tool, IMS (Inductive Monitoring System), is an anomaly detection tool that was developed at NASA Ames Research Center. The three tools were integrated and deployed to KSC, where they were interfaced with live data. This paper describes how the prototype performed during the period of time before the launch, including accuracy and computer resource usage. The paper concludes with some of the lessons that we learned from the experience of developing and deploying the prototype.

  20. Communication grounding facility

    International Nuclear Information System (INIS)

    Lee, Gye Seong

    1998-06-01

    It is about communication grounding facility, which is made up twelve chapters. It includes general grounding with purpose, materials thermal insulating material, construction of grounding, super strength grounding method, grounding facility with grounding way and building of insulating, switched grounding with No. 1A and LCR, grounding facility of transmission line, wireless facility grounding, grounding facility in wireless base station, grounding of power facility, grounding low-tenton interior power wire, communication facility of railroad, install of arrester in apartment and house, install of arrester on introduction and earth conductivity and measurement with introduction and grounding resistance.

  1. Exponential synchronization of two nonlinearly non-delayed and delayed coupled complex dynamical networks

    International Nuclear Information System (INIS)

    Zheng Song

    2012-01-01

    In this paper, the exponential synchronization between two nonlinearly coupled complex networks with non-delayed and delayed coupling is investigated with Lyapunov-Krasovskii-type functionals. Based on the stability analysis of the impulsive differential equation and the linear matrix inequality, sufficient delay-dependent conditions for exponential synchronization are derived, and a linear impulsive controller and simple updated laws are also designed. Furthermore, the coupling matrices need not be symmetric or irreducible. Numerical examples are presented to verify the effectiveness and correctness of the synchronization criteria obtained.

  2. A Robust and Multi-Weighted Approach to Estimating Topographically Correlated Tropospheric Delays in Radar Interferograms

    Directory of Open Access Journals (Sweden)

    Bangyan Zhu

    2016-07-01

    Full Text Available Spatial and temporal variations in the vertical stratification of the troposphere introduce significant propagation delays in interferometric synthetic aperture radar (InSAR observations. Observations of small amplitude surface deformations and regional subsidence rates are plagued by tropospheric delays, and strongly correlated with topographic height variations. Phase-based tropospheric correction techniques assuming a linear relationship between interferometric phase and topography have been exploited and developed, with mixed success. Producing robust estimates of tropospheric phase delay however plays a critical role in increasing the accuracy of InSAR measurements. Meanwhile, few phase-based correction methods account for the spatially variable tropospheric delay over lager study regions. Here, we present a robust and multi-weighted approach to estimate the correlation between phase and topography that is relatively insensitive to confounding processes such as regional subsidence over larger regions as well as under varying tropospheric conditions. An expanded form of robust least squares is introduced to estimate the spatially variable correlation between phase and topography by splitting the interferograms into multiple blocks. Within each block, correlation is robustly estimated from the band-filtered phase and topography. Phase-elevation ratios are multiply- weighted and extrapolated to each persistent scatter (PS pixel. We applied the proposed method to Envisat ASAR images over the Southern California area, USA, and found that our method mitigated the atmospheric noise better than the conventional phase-based method. The corrected ground surface deformation agreed better with those measured from GPS.

  3. Distance Constrained Based Adaptive Flocking Control for Multiagent Networks with Time Delay

    Directory of Open Access Journals (Sweden)

    Qing Zhang

    2015-01-01

    Full Text Available The flocking control of multiagent system is a new type of decentralized control method, which has aroused great attention. The paper includes a detailed research in terms of distance constrained based adaptive flocking control for multiagent system with time delay. Firstly, the program on the adaptive flocking with time delay of multiagent is proposed. Secondly, a kind of adaptive controllers and updating laws are presented. According to the Lyapunov stability theory, it is proved that the distance between agents can be larger than a constant during the motion evolution. What is more, velocities of each agent come to the same asymptotically. Finally, the analytical results can be verified by a numerical example.

  4. Delay-Range-Dependent H∞ Control for Automatic Mooring Positioning System with Time-Varying Input Delay

    Directory of Open Access Journals (Sweden)

    Xiaoyu Su

    2014-01-01

    Full Text Available Aiming at the economy and security of the positioning system in semi-submersible platform, the paper presents a new scheme based on the mooring line switching strategy. Considering the input delay in switching process, H∞ control with time-varying input delay is designed to calculate the control forces to resist disturbing forces. In order to reduce the conservativeness, the information of the lower bound of delay is taken into account, and a Lyapunov function which contains the range of delay is constructed. Besides, the input constraint is considered to avoid breakage of mooring lines. The sufficient conditions for delay-range-dependent stabilization are derived in terms of LMI, and the controller is also obtained. The effectiveness of the proposed approach is illustrated by a realistic design example.

  5. Systematic of delayed neutron parameters

    International Nuclear Information System (INIS)

    Isaev, S.G.; Piksaikin, V.M.

    2000-01-01

    The experimental studies of the energy dependence of the delayed neutron (DN) parameters for various fission systems has shown that the behaviour of a some combination of delayed neutron parameters has a similar features. On the basis of this findings the systematics of delayed neutron experimental data for thorium, uranium, plutonium and americium isotopes have been investigated with the purpose to find a correlation of DN parameters with characteristics of fissioning system as well as a correlation between the delayed neutron parameters themselves. It was presented the preliminary results which were obtained during study the physics interpretation of the results [ru

  6. Language delays, reading delays, and learning difficulties: interactive elements requiring multidimensional programming.

    Science.gov (United States)

    Hay, Ian; Elias, Gordon; Fielding-Barnsley, Ruth; Homel, Ross; Freiberg, Kate

    2007-01-01

    Researchers have hypothesized four levels of instructional dialogue and claimed that teachers can improve children's language development by incorporating these dialogue levels in their classrooms. It has also been hypothesized that enhancing children's early language development enhances children's later reading development. This quasi-experimental research study investigated both of these hypotheses using a collaborative service delivery model for Grade 1 children with language difficulties from a socially and economically disadvantaged urban community in Australia. Comparing the end-of-year reading achievement scores for the 57 children who received the language intervention with those of the 59 children in the comparison group, the findings from this research are supportive of both hypotheses. The interrelationships between learning difficulties, reading difficulties, and language difficulties are discussed along with children's development in vocabulary, use of memory strategies and verbal reasoning, and the need for multidimensional programming.

  7. A Comparison of Two Commercial Volumetry Software Programs in the Analysis of Pulmonary Ground-Glass Nodules: Segmentation Capability and Measurement Accuracy

    Science.gov (United States)

    Kim, Hyungjin; Lee, Sang Min; Lee, Hyun-Ju; Goo, Jin Mo

    2013-01-01

    Objective To compare the segmentation capability of the 2 currently available commercial volumetry software programs with specific segmentation algorithms for pulmonary ground-glass nodules (GGNs) and to assess their measurement accuracy. Materials and Methods In this study, 55 patients with 66 GGNs underwent unenhanced low-dose CT. GGN segmentation was performed by using 2 volumetry software programs (LungCARE, Siemens Healthcare; LungVCAR, GE Healthcare). Successful nodule segmentation was assessed visually and morphologic features of GGNs were evaluated to determine factors affecting segmentation by both types of software. In addition, the measurement accuracy of the software programs was investigated by using an anthropomorphic chest phantom containing simulated GGNs. Results The successful nodule segmentation rate was significantly higher in LungCARE (90.9%) than in LungVCAR (72.7%) (p = 0.012). Vascular attachment was a negatively influencing morphologic feature of nodule segmentation for both software programs. As for measurement accuracy, mean relative volume measurement errors in nodules ≥ 10 mm were 14.89% with LungCARE and 19.96% with LungVCAR. The mean relative attenuation measurement errors in nodules ≥ 10 mm were 3.03% with LungCARE and 5.12% with LungVCAR. Conclusion LungCARE shows significantly higher segmentation success rates than LungVCAR. Measurement accuracy of volume and attenuation of GGNs is acceptable in GGNs ≥ 10 mm by both software programs. PMID:23901328

  8. A comparison of two commercial volumetry software programs in the analysis of pulmonary ground-glass nodules: Segmentation capability and measurement accuracy

    International Nuclear Information System (INIS)

    Kim, Hyung Jin; Park, Chang Min; Lee, Sang Min; Lee, Hyun Joo; Goo, Jin Mo

    2013-01-01

    To compare the segmentation capability of the 2 currently available commercial volumetry software programs with specific segmentation algorithms for pulmonary ground-glass nodules (GGNs) and to assess their measurement accuracy. In this study, 55 patients with 66 GGNs underwent unenhanced low-dose CT. GGN segmentation was performed by using 2 volumetry software programs (LungCARE, Siemens Healthcare; LungVCAR, GE Healthcare). Successful nodule segmentation was assessed visually and morphologic features of GGNs were evaluated to determine factors affecting segmentation by both types of software. In addition, the measurement accuracy of the software programs was investigated by using an anthropomorphic chest phantom containing simulated GGNs. The successful nodule segmentation rate was significantly higher in LungCARE (90.9%) than in LungVCAR (72.7%) (p = 0.012). Vascular attachment was a negatively influencing morphologic feature of nodule segmentation for both software programs. As for measurement accuracy, mean relative volume measurement errors in nodules ≥ 10 mm were 14.89% with LungCARE and 19.96% with LungVCAR. The mean relative attenuation measurement errors in nodules ≥ 10 mm were 3.03% with LungCARE and 5.12% with LungVCAR. LungCARE shows significantly higher segmentation success rates than LungVCAR. Measurement accuracy of volume and attenuation of GGNs is acceptable in GGNs ≥ 10 mm by both software programs.

  9. A comparison of two commercial volumetry software programs in the analysis of pulmonary ground-glass nodules: Segmentation capability and measurement accuracy

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyung Jin; Park, Chang Min; Lee, Sang Min; Lee, Hyun Joo; Goo, Jin Mo [Dept. of Radiology, Seoul National University College of Medicine, and Institute of Radiation Medicine, Seoul National University Medical Research Center, Seoul (Korea, Republic of)

    2013-08-15

    To compare the segmentation capability of the 2 currently available commercial volumetry software programs with specific segmentation algorithms for pulmonary ground-glass nodules (GGNs) and to assess their measurement accuracy. In this study, 55 patients with 66 GGNs underwent unenhanced low-dose CT. GGN segmentation was performed by using 2 volumetry software programs (LungCARE, Siemens Healthcare; LungVCAR, GE Healthcare). Successful nodule segmentation was assessed visually and morphologic features of GGNs were evaluated to determine factors affecting segmentation by both types of software. In addition, the measurement accuracy of the software programs was investigated by using an anthropomorphic chest phantom containing simulated GGNs. The successful nodule segmentation rate was significantly higher in LungCARE (90.9%) than in LungVCAR (72.7%) (p = 0.012). Vascular attachment was a negatively influencing morphologic feature of nodule segmentation for both software programs. As for measurement accuracy, mean relative volume measurement errors in nodules ≥ 10 mm were 14.89% with LungCARE and 19.96% with LungVCAR. The mean relative attenuation measurement errors in nodules ≥ 10 mm were 3.03% with LungCARE and 5.12% with LungVCAR. LungCARE shows significantly higher segmentation success rates than LungVCAR. Measurement accuracy of volume and attenuation of GGNs is acceptable in GGNs ≥ 10 mm by both software programs.

  10. Note: Large active area solid state photon counter with 20 ps timing resolution and 60 fs detection delay stability

    Science.gov (United States)

    Prochazka, Ivan; Kodet, Jan; Eckl, Johann; Blazej, Josef

    2017-10-01

    We are reporting on the design, construction, and performance of a photon counting detector system, which is based on single photon avalanche diode detector technology. This photon counting device has been optimized for very high timing resolution and stability of its detection delay. The foreseen application of this detector is laser ranging of space objects, laser time transfer ground to space and fundamental metrology. The single photon avalanche diode structure, manufactured on silicon using K14 technology, is used as a sensor. The active area of the sensor is circular with 200 μm diameter. Its photon detection probability exceeds 40% in the wavelength range spanning from 500 to 800 nm. The sensor is operated in active quenching and gating mode. A new control circuit was optimized to maintain high timing resolution and detection delay stability. In connection to this circuit, timing resolution of the detector is reaching 20 ps FWHM. In addition, the temperature change of the detection delay is as low as 70 fs/K. As a result, the detection delay stability of the device is exceptional: expressed in the form of time deviation, detection delay stability of better than 60 fs has been achieved. Considering the large active area aperture of the detector, this is, to our knowledge, the best timing performance reported for a solid state photon counting detector so far.

  11. Delay-Dependent Guaranteed Cost H∞ Control of an Interval System with Interval Time-Varying Delay

    Directory of Open Access Journals (Sweden)

    Zhongke Shi

    2009-01-01

    Full Text Available This paper concerns the problem of the delay-dependent robust stability and guaranteed cost H∞ control for an interval system with time-varying delay. The interval system with matrix factorization is provided and leads to less conservative conclusions than solving a square root. The time-varying delay is assumed to belong to an interval and the derivative of the interval time-varying delay is not a restriction, which allows a fast time-varying delay; also its applicability is broad. Based on the Lyapunov-Ktasovskii approach, a delay-dependent criterion for the existence of a state feedback controller, which guarantees the closed-loop system stability, the upper bound of cost function, and disturbance attenuation lever for all admissible uncertainties as well as out perturbation, is proposed in terms of linear matrix inequalities (LMIs. The criterion is derived by free weighting matrices that can reduce the conservatism. The effectiveness has been verified in a number example and the compute results are presented to validate the proposed design method.

  12. $\\beta$-delayed neutrons from oriented $^{137,139}$I and $^{87,89}$Br nuclei

    CERN Document Server

    Grzywacz, Robert; Stone, Nicholas; Köster, Ulli; Singh, Barlaj; Bingham, Carrol; Gaulard, S; Kolos, Karolina; Madurga, Miguel; Nikolov, J; Otsubo, T; Roccia, S; Veskovic, Miroslav; Walker, Phil; Walters, William

    2013-01-01

    We propose a world-­‐first measurement of the angular distribution of $\\beta$-­‐delayed n and $\\gamma$- radiation from oriented $^{137, 139}$I and $^{87,89}$Br nuclei, polarised at low temperature at the NICOLE facility. $\\beta$-­‐delayed neutron emission is an increasingly important decay mechanism as the drip line is approached and its detailed understanding is essential to phenomena as fundamental as the r‐process and practical as the safe operation of nuclear power reactors. The experiments offer sensitive tests of theoretical input concerning the allowed and first-­‐forbidden $\\beta$‐decay strength, the spin-­‐density of neutron emitting states and the partial wave barrier penetration as a function of nuclear deformation. In $^{137}$I and $^{87}$Br the decay feeds predominantly the ground state of the daughters $^{136}$Xe and $^{86}$Kr whereas in $^{139}$I and $^{89}$Br we will explore the use of n-$\\gamma$- coincidence to study neutron transitions to the first and second excited state...

  13. Stochastic two-delay differential model of delayed visual feedback effects on postural dynamics.

    Science.gov (United States)

    Boulet, Jason; Balasubramaniam, Ramesh; Daffertshofer, Andreas; Longtin, André

    2010-01-28

    We report on experiments and modelling involving the 'visuo-postural control loop' in the upright stance. We experimentally manipulated an artificial delay to the visual feedback during standing, presented at delays ranging from 0 to 1 s in increments of 250 ms. Using stochastic delay differential equations, we explicitly modelled the centre-of-pressure (COP) and centre-of-mass (COM) dynamics with two independent delay terms for vision and proprioception. A novel 'drifting fixed point' hypothesis was used to describe the fluctuations of the COM with the COP being modelled as a faster, corrective process of the COM. The model was in good agreement with the data in terms of probability density functions, power spectral densities, short- and long-term correlations (Hurst exponents) as well the critical time between the two ranges. This journal is © 2010 The Royal Society

  14. Ground-water hydrology and radioactive waste disposal at the Hanford Site

    International Nuclear Information System (INIS)

    Law, A.G.

    1979-02-01

    This paper is a summary of the hydrologic activities conducted at the Hanford Site as a part of the environmental protection effort. The Site encompasses 1,480 square kilometers in the arid, southeastern part of Washington State. Precipitation averages about 160 millimeters per year with a negligible amount, if any, recharging the water table, which is from 50 to 100 meters below the ground surface. An unconfined aquifer occurs in the upper and middle Ringold Formations. The lower Ringold Formation along with interbed and interflow zones in the Saddle Mountain and Wanapum basalts forms a confined aquifer system. A potential exists for the interconnection of the unconfined and confined aquifer systems, especially near Gable Mountain where the anticlinal ridge was eroded by the catastrophic floods of the ancestral Columbia River system. Liquid wastes from chemical processing operations have resulted in large quantities of processing and cooling water disposed to ground via ponds, cribs, and ditches. The ground-water hydrology program at Hanford is designed: (1) to define and quantify the ground-water flow systems, (2) to evaluate the impact of the liquid waste discharges on these flow systems, and (3) to predict the impact on the ground-water systems of changes in system inputs. This work is conducted through a drilling, sampling, testing, and modeling program

  15. Analysis of a first-order delay differential-delay equation containing two delays

    Science.gov (United States)

    Marriott, C.; Vallée, R.; Delisle, C.

    1989-09-01

    An experimental and numerical analysis of the behavior of a two-delay differential equation is presented. It is shown that much of the system's behavior can be related to the stability behavior of the underlying linearized modes. A new phenomenon, mode crossing, is explored.

  16. Delaying gratification depends on social trust

    Science.gov (United States)

    Michaelson, Laura; de la Vega, Alejandro; Chatham, Christopher H.; Munakata, Yuko

    2013-01-01

    Delaying gratification is hard, yet predictive of important life outcomes, such as academic achievement and physical health. Prominent theories focus on the role of self-control, hypersensitivity to immediate rewards, and the cost of time spent waiting. However, delaying gratification may also require trust in people delivering future rewards as promised. To test the role of social trust, participants were presented with character vignettes and faces that varied in trustworthiness, and then choose between hypothetical smaller immediate or larger delayed rewards from those characters. Across two experiments, participants were less willing to wait for delayed rewards from less trustworthy characters, and perceived trustworthiness predicted willingness to delay gratification. These findings provide the first demonstration of a causal role for social trust in willingness to delay gratification, independent of other relevant factors, such as self-control or reward history. Thus, delaying gratification requires choosing not only a later reward, but a reward that is potentially less likely to be delivered, when there is doubt about the person promising it. Implications of this work include the need to revise prominent theories of delay of gratification, and new directions for interventions with populations characterized by impulsivity. PMID:23801977

  17. Delaying gratification depends on social trust

    Directory of Open Access Journals (Sweden)

    Laura eMichaelson

    2013-06-01

    Full Text Available Delaying gratification is hard, yet predictive of important life outcomes, such as academic achievement and physical health. Prominent theories focus on the role of self-control, hypersensitivity to immediate rewards, and the cost of time spent waiting. However, delaying gratification may also require trust in people delivering future rewards as promised. To test the role of social trust, participants were presented with character vignettes and faces that varied in trustworthiness, and then chose between hypothetical smaller immediate or larger delayed rewards from those characters. Across two experiments, participants were less willing to wait for delayed rewards from less trustworthy characters, and perceived trustworthiness predicted willingness to delay gratification. These findings provide the first demonstration of a causal role for social trust in willingness to delay gratification, independent of other relevant factors, such as self-control or reward history. Thus, delaying gratification requires choosing not only a later reward, but a reward that is potentially less likely to be delivered, when there is doubt about the person promising it. Implications of this work include the need to revise prominent theories of delay of gratification, and new directions for interventions with populations characterized by impulsivity.

  18. Boarding is associated with higher rates of medication delays and adverse events but fewer laboratory-related delays.

    Science.gov (United States)

    Sri-On, Jiraporn; Chang, Yuchiao; Curley, David P; Camargo, Carlos A; Weissman, Joel S; Singer, Sara J; Liu, Shan W

    2014-09-01

    Hospital crowding and emergency department (ED) boarding are large and growing problems. To date, there has been a paucity of information regarding the quality of care received by patients boarding in the ED compared with the care received by patients on an inpatient unit. We compared the rate of delays and adverse events at the event level that occur while boarding in the ED vs while on an inpatient unit. This study was a secondary analysis of data from medical record review and administrative databases at 2 urban academic teaching hospitals from August 1, 2004, through January 31, 2005. We measured delayed repeat cardiac enzymes, delayed partial thromboplastin time level checks, delayed antibiotic administration, delayed administration of home medications, and adverse events. We compared the incidence of events during ED boarding vs while on an inpatient unit. Among 1431 patient medical records, we identified 1016 events. Emergency department boarding was associated with an increased risk of home medication delays (risk ratio [RR], 1.54; 95% confidence interval [CI], 1.26-1.88), delayed antibiotic administration (RR, 2.49; 95% CI, 1.72-3.52), and adverse events (RR, 2.36; 95% CI, 1.15-4.72). On the contrary, ED boarding was associated with fewer delays in repeat cardiac enzymes (RR, 0.17; 95% CI, 0.09-0.27) and delayed partial thromboplastin time checks (RR, 0.54; 95% CI, 0.27-0.96). Compared with inpatient units, ED boarding was associated with more medication-related delays and adverse events but fewer laboratory-related delays. Until we can eliminate ED boarding, it is critical to identify areas for improvement. Copyright © 2014 Elsevier Inc. All rights reserved.

  19. Ground-Water Quality Data in the San Fernando-San Gabriel Study Unit, 2005 - Results from the California GAMA Program

    Science.gov (United States)

    Land, Michael; Belitz, Kenneth

    2008-01-01

    Ground-water quality in the approximately 460 square mile San Fernando-San Gabriel study unit (SFSG) was investigated between May and July 2005 as part of the Priority Basin Assessment Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The GAMA Priority Basin Assessment Project was developed in response to the Groundwater Quality Monitoring Act of 2001 and is being conducted by the U.S. Geological Survey (USGS) in cooperation with the California State Water Resources Control Board (SWRCB). The San Fernando-San Gabriel study was designed to provide a spatially unbiased assessment of raw ground-water quality within SFSG, as well as a statistically consistent basis for comparing water quality throughout California. Samples were collected from 52 wells in Los Angeles County. Thirty-five of the wells were selected using a spatially distributed, randomized grid-based method to provide statistical representation of the study area (grid wells), and seventeen wells were selected to aid in the evaluation of specific water-quality issues or changes in water chemistry along a historic ground-water flow path (understanding wells). The ground-water samples were analyzed for a large number of synthetic organic constituents [volatile organic compounds (VOCs), pesticides and pesticide degradates], constituents of special interest [perchlorate, N-nitrosodimethylamine (NDMA), 1,2,3-trichloropropane (1,2,3-TCP), and 1,4-dioxane], naturally occurring inorganic constituents (nutrients, major and minor ions, and trace elements), radioactive constituents, and microbial indicators. Naturally occurring isotopes (tritium, and carbon-14, and stable isotopes of hydrogen, oxygen, and carbon), and dissolved noble gases also were measured to help identify the source and age of the sampled ground water. Quality-control samples (blanks, replicates, samples for matrix spikes) were collected at approximately one-fifth (11 of 52) of the wells, and the results for these

  20. Effect of Neutral Grounding Protection Methods for Compensated Wind/PV Grid-Connected Hybrid Power Systems

    Directory of Open Access Journals (Sweden)

    Nurettin Çetinkaya

    2017-01-01

    Full Text Available The effects of the wind/PV grid-connected system (GCS can be categorized as technical, environmental, and economic impacts. It has a vital impact for improving the voltage in the power systems; however, it has some negative effects such as interfacing and fault clearing. This paper discusses different grounding methods for fault protection of High-voltage (HV power systems. Influences of these grounding methods for various fault characteristics on wind/PV GCSs are discussed. Simulation models are implemented in the Alternative Transient Program (ATP version of the Electromagnetic Transient Program (EMTP. The models allow for different fault factors and grounding methods. Results are obtained to evaluate the impact of each grounding method on the 3-phase short-circuit fault (SCF, double-line-to-ground (DLG fault, and single-line-to-ground (SLG fault features. Solid, resistance, and Petersen coil grounding are compared for different faults on wind/PV GCSs. Transient overcurrent and overvoltage waveforms are used to describe the fault case. This paper is intended as a guide to engineers in selecting adequate grounding and ground fault protection schemes for HV, for evaluating existing wind/PV GCSs to minimize the damage of the system components from faults. This research presents the contribution of wind/PV generators and their comparison with the conventional system alone.

  1. Global exponential convergence of neutral-type Hopfield neural networks with multi-proportional delays and leakage delays

    International Nuclear Information System (INIS)

    Xu, Changjin; Li, Peiluan

    2017-01-01

    This paper is concerned with a class of neutral-type Hopfield neural networks with multi-proportional delays and leakage delays. Using the differential inequality theory, a set of sufficient conditions which guarantee that all solutions of neutral-type Hopfield neural networks with multi-proportional delays and leakage delays converge exponentially to zero vector are derived. Computer simulations are carried out to verify our theoretical findings. The obtained results of this paper are new and complement some previous studies.

  2. Delay-Dependent Exponential Stability for Discrete-Time BAM Neural Networks with Time-Varying Delays

    Directory of Open Access Journals (Sweden)

    Yonggang Chen

    2008-01-01

    Full Text Available This paper considers the delay-dependent exponential stability for discrete-time BAM neural networks with time-varying delays. By constructing the new Lyapunov functional, the improved delay-dependent exponential stability criterion is derived in terms of linear matrix inequality (LMI. Moreover, in order to reduce the conservativeness, some slack matrices are introduced in this paper. Two numerical examples are presented to show the effectiveness and less conservativeness of the proposed method.

  3. Grounding modelling for transient overvoltage simulation in electric power transmission

    International Nuclear Information System (INIS)

    Moreno O, German; Valencia V, Jaime A; Villada, Fernando

    1992-01-01

    Grounding plays an important role in transmission line outages and consequently on electric energy transmission quality indexes. Fundamentals of an accurate modelling for transient behaviour analysis, particularly for the response of transmission lines to lightning, are presented. Also, a method to take into account the electromagnetic propagation guided by the grounding electrodes and finally to assess the grounding impedance in order to simulate the transmission line behaviour under lightning is presented. Analysis of impedance behaviour for diverse configurations and simulation results of over voltages on a real 220 kV line are presented to illustrate the capabilities of the method and of the computational program developed

  4. Synchronization in networks with heterogeneous coupling delays

    Science.gov (United States)

    Otto, Andreas; Radons, Günter; Bachrathy, Dániel; Orosz, Gábor

    2018-01-01

    Synchronization in networks of identical oscillators with heterogeneous coupling delays is studied. A decomposition of the network dynamics is obtained by block diagonalizing a newly introduced adjacency lag operator which contains the topology of the network as well as the corresponding coupling delays. This generalizes the master stability function approach, which was developed for homogenous delays. As a result the network dynamics can be analyzed by delay differential equations with distributed delay, where different delay distributions emerge for different network modes. Frequency domain methods are used for the stability analysis of synchronized equilibria and synchronized periodic orbits. As an example, the synchronization behavior in a system of delay-coupled Hodgkin-Huxley neurons is investigated. It is shown that the parameter regions where synchronized periodic spiking is unstable expand when increasing the delay heterogeneity.

  5. Ground Pollution Science

    International Nuclear Information System (INIS)

    Oh, Jong Min; Bae, Jae Geun

    1997-08-01

    This book deals with ground pollution science and soil science, classification of soil and fundamentals, ground pollution and human, ground pollution and organic matter, ground pollution and city environment, environmental problems of the earth and ground pollution, soil pollution and development of geological features of the ground, ground pollution and landfill of waste, case of measurement of ground pollution.

  6. Securing Ground Data System Applications for Space Operations

    Science.gov (United States)

    Pajevski, Michael J.; Tso, Kam S.; Johnson, Bryan

    2014-01-01

    The increasing prevalence and sophistication of cyber attacks has prompted the Multimission Ground Systems and Services (MGSS) Program Office at Jet Propulsion Laboratory (JPL) to initiate the Common Access Manager (CAM) effort to protect software applications used in Ground Data Systems (GDSs) at JPL and other NASA Centers. The CAM software provides centralized services and software components used by GDS subsystems to meet access control requirements and ensure data integrity, confidentiality, and availability. In this paper we describe the CAM software; examples of its integration with spacecraft commanding software applications and an information management service; and measurements of its performance and reliability.

  7. Annx IV. Delayed nuclear power plant project management experience Cernavoda 2 NPP, Romania

    International Nuclear Information System (INIS)

    2008-01-01

    The Cernavoda Unit 2 NPP work was originally started in 1982 with work coming to a halt in 1989, and a preservation program implemented in 1991 while work continued on Unit 1. In 1995 attention turned to the completion of Unit 2 and status verification reports were commissioned. Work proceeded, as funds were available, up until 2002 when an interim contract was signed. Subsequently a Contract Completion Effective Date (CCED) was signed in March 2003 with completion duration of 48 months. A project schedule is a necessity for any project whether it is a new build or a restart to a delayed project. There are 5 major elements that are included in all CANDU project schedules, Engineering, Procurement, Construction, Commissioning and the conversion from Construction to Commissioning. The Engineering schedule of deliverables was not fully defined at CCED. Design changes defined prior to CCED were not fully defined and the scope of work associated with these only became known during the actual construction program. A significant number of new design changes were introduced after CCED, which compounded the impact to the construction program. All projects require their budgets to be built up within a defined structure. Delayed projects are no different from other projects in that respect. The standard Work Brakout Structure (WBS), which is applicable to most CANDU projects, is equally applicable for a delayed project. On Cernavoda Unit 2 we used a Budget Breakdown Structure, which was a combination of a traditional WBS and an Organization Structure. This structure was adopted in order to have consistency with the structure, which had been used prior to the delay on the project and also it was a requirement of the three party agreements with funding from different sources and in different currencies. All major construction projects normally carry a contingency allowance for undefined work and a risk allowance for the possibility of major changes. Delayed projects require

  8. Sea Ice Detection Based on Differential Delay-Doppler Maps from UK TechDemoSat-1

    Directory of Open Access Journals (Sweden)

    Yongchao Zhu

    2017-07-01

    Full Text Available Global Navigation Satellite System (GNSS signals can be exploited to remotely sense atmosphere and land and ocean surface to retrieve a range of geophysical parameters. This paper proposes two new methods, termed as power-summation of differential Delay-Doppler Maps (PS-D and pixel-number of differential Delay-Doppler Maps (PN-D, to distinguish between sea ice and sea water using differential Delay-Doppler Maps (dDDMs. PS-D and PN-D make use of power-summation and pixel-number of dDDMs, respectively, to measure the degree of difference between two DDMs so as to determine the transition state (water-water, water-ice, ice-ice and ice-water and hence ice and water are detected. Moreover, an adaptive incoherent averaging of DDMs is employed to improve the computational efficiency. A large number of DDMs recorded by UK TechDemoSat-1 (TDS-1 over the Arctic region are used to test the proposed sea ice detection methods. Through evaluating against ground-truth measurements from the Ocean Sea Ice SAF, the proposed PS-D and PN-D methods achieve a probability of detection of 99.72% and 99.69% respectively, while the probability of false detection is 0.28% and 0.31% respectively.

  9. Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions. Volume 2, Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-18

    This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake`s ground motion is a function of the earthquake`s magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is a stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. This document, Volume II, contains Appendices 2, 3, 5, 6, and 7 covering the following topics: Eastern North American Empirical Ground Motion Data; Examination of Variance of Seismographic Network Data; Soil Amplification and Vertical-to-Horizontal Ratios from Analysis of Strong Motion Data From Active Tectonic Regions; Revision and Calibration of Ou and Herrmann Method; Generalized Ray Procedure for Modeling Ground Motion Attenuation; Crustal Models for Velocity Regionalization; Depth Distribution Models; Development of Generic Site Effects Model; Validation and Comparison of One-Dimensional Site Response Methodologies; Plots of Amplification Factors; Assessment of Coupling Between Vertical & Horizontal Motions in Nonlinear Site Response Analysis; and Modeling of Dynamic Soil Properties.

  10. Group Delay of High Q Antennas

    DEFF Research Database (Denmark)

    Bahramzy, Pevand; Pedersen, Gert Frølund

    2013-01-01

    Group Delay variations versus frequency is an essential factor which can cause distortion and degradation in the signals. Usually this is an issue in wideband communication systems, such as satellite communication systems, which are used for transmitting wideband data. However, group delay can also...... become an issue, when working with high Q antennas, because of the steep phase shift over the frequency. In this paper, it is measured how large group delay variations can become, when going from a low Q antenna to a high Q antenna. The group delay of a low Q antenna is shown to be around 1.3 ns, whereas...... a high Q antenna has group delay of around 22 ns. It is due to this huge group delay variation characteristics of high Q antennas, that signal distortion might occur in the radio system with high Q antennas....

  11. Programming Cardiac Resynchronization Therapy for Electrical Synchrony: Reaching Beyond Left Bundle Branch Block and Left Ventricular Activation Delay.

    Science.gov (United States)

    Varma, Niraj; O'Donnell, David; Bassiouny, Mohammed; Ritter, Philippe; Pappone, Carlo; Mangual, Jan; Cantillon, Daniel; Badie, Nima; Thibault, Bernard; Wisnoskey, Brian

    2018-02-06

    QRS narrowing following cardiac resynchronization therapy with biventricular (BiV) or left ventricular (LV) pacing is likely affected by patient-specific conduction characteristics (PR, qLV, LV-paced propagation interval), making a universal programming strategy likely ineffective. We tested these factors using a novel, device-based algorithm (SyncAV) that automatically adjusts paced atrioventricular delay (default or programmable offset) according to intrinsic atrioventricular conduction. Seventy-five patients undergoing cardiac resynchronization therapy (age 66±11 years; 65% male; 32% with ischemic cardiomyopathy; LV ejection fraction 28±8%; QRS duration 162±16 ms) with intact atrioventricular conduction (PR interval 194±34, range 128-300 ms), left bundle branch block, and optimized LV lead position were studied at implant. QRS duration (QRSd) reduction was compared for the following pacing configurations: nominal simultaneous BiV (Mode I: paced/sensed atrioventricular delay=140/110 ms), BiV+SyncAV with 50 ms offset (Mode II), BiV+SyncAV with offset that minimized QRSd (Mode III), or LV-only pacing+SyncAV with 50 ms offset (Mode IV). The intrinsic QRSd (162±16 ms) was reduced to 142±17 ms (-11.8%) by Mode I, 136±14 ms (-15.6%) by Mode IV, and 132±13 ms (-17.8%) by Mode II. Mode III yielded the shortest overall QRSd (123±12 ms, -23.9% [ P <0.001 versus all modes]) and was the only configuration without QRSd prolongation in any patient. QRS narrowing occurred regardless of QRSd, PR, or LV-paced intervals, or underlying ischemic disease. Post-implant electrical optimization in already well-selected patients with left bundle branch block and optimized LV lead position is facilitated by patient-tailored BiV pacing adjusted to intrinsic atrioventricular timing using an automatic device-based algorithm. © 2018 The Authors. Published on behalf of the American Heart Association, Inc., by Wiley.

  12. Solar House Obdach: experiences with a solar ground-coupled storage system

    Energy Technology Data Exchange (ETDEWEB)

    Bruck, M; Blum, P; Held, E; Aranovitch, E; Hardacre, A G; Ofverholm, E [eds.

    1982-09-14

    Within the framework of the Solar House Obdach-project, a system consisting of a ground heat exchanger, a low-temperature collector, a water-glycol/water heat pump and a low-temperature heating system was examined with regard to its suitability as only heat source of a house. With the design chosen (1 m/sup 2/ ground collector area and 0.3 m/sup 2/ low-temperature collector area per 80 W load), a seasonal performance factor of 2.83 could be obtained. About 40% of the low-temperature heat supplied to the heat pump were delivered directly or indirectly (by means of short-term storage in the ground) by the low-temperature collector, whereas about 60% came from the natural sources of energy of the ground (air heat, radiation, precipitation, ground water and slope water). The results obtained are used to verify and improve a computer model design program for ground collectors and ground-coupled storage systems which should help to optimize the design of solar plants, particularly under difficult conditions.

  13. Using GPS RO L1 data for calibration of the atmospheric path delay model for data reduction of the satellite altimetery observations.

    Science.gov (United States)

    Petrov, L.

    2017-12-01

    Processing satellite altimetry data requires the computation of path delayin the neutral atmosphere that is used for correcting ranges. The path delayis computed using numerical weather models and the accuracy of its computationdepends on the accuracy of numerical weather models. Accuracy of numerical modelsof numerical weather models over Antarctica and Greenland where there is a very sparse network of ground stations, is not well known. I used the dataset of GPS RO L1 data, computed predicted path delay for ROobservations using the numerical whether model GEOS-FPIT, formed the differences with observed path delay and used these differences for computationof the corrections to the a priori refractivity profile. These profiles wereused for computing corrections to the a priori zenith path delay. The systematic patter of these corrections are used for de-biasing of the the satellite altimetry results and for characterization of the systematic errorscaused by mismodeling atmosphere.

  14. TFM Performance Monitoring and Review System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — A wide variety of flow management techniques is employed every day in the NAS, from strategic Ground Delay Programs (GDP's) with national scope to local...

  15. Near Real-Time Nondestructive Active Inspection Technologies Utilizing Delayed γ-Rays and Neutrons for Advanced Safeguards

    International Nuclear Information System (INIS)

    Hunt, Alan; Tobin, S. J.

    2015-01-01

    In this two year project, the research team investigated how delayed γ-rays from short-lived fission fragments detected in the short interval between irradiating pulses can be exploited for advanced safeguards technologies. This program contained experimental and modeling efforts. The experimental effort measured the emitted spectra, time histories and correlations of the delayed γ-rays from aqueous solutions and solid targets containing fissionable isotopes. The modeling effort first developed and benchmarked a hybrid Monte Carlo simulation technique based on these experiments. The benchmarked simulations were then extended to other safeguards scenarios, allowing comparisons to other advanced safeguards technologies and to investigate combined techniques. Ultimately, the experiments demonstrated the possible utility of actively induced delayed γ-ray spectroscopy for fissionable material assay.

  16. Near Real-Time Nondestructive Active Inspection Technologies Utilizing Delayed γ-Rays and Neutrons for Advanced Safeguards

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, Alan [Idaho State Univ., Pocatello, ID (United States). Idaho Accelerator Center, Dept. of Physics; Reedy, E. T.E. [Idaho State Univ., Pocatello, ID (United States). Dept. of Phyics, Idaho Accelerator Center; Mozin, V. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Tobin, S. J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Nuclear Nonproliferation

    2015-02-12

    In this two year project, the research team investigated how delayed γ-rays from short-lived fission fragments detected in the short interval between irradiating pulses can be exploited for advanced safeguards technologies. This program contained experimental and modeling efforts. The experimental effort measured the emitted spectra, time histories and correlations of the delayed γ-rays from aqueous solutions and solid targets containing fissionable isotopes. The modeling effort first developed and benchmarked a hybrid Monte Carlo simulation technique based on these experiments. The benchmarked simulations were then extended to other safeguards scenarios, allowing comparisons to other advanced safeguards technologies and to investigate combined techniques. Ultimately, the experiments demonstrated the possible utility of actively induced delayed γ-ray spectroscopy for fissionable material assay.

  17. Linear rotary optical delay lines

    Science.gov (United States)

    Guerboukha, Hichem; Qu, Hang; Skorobogatiy, Maksim

    2016-03-01

    We present a semi-analytical solution for the design of a high-speed rotary optical delay line that use a combination of two rotating curvilinear reflectors. We demonstrate that it is possible to design an infinite variety of the optical delay lines featuring linear dependence of the optical delay on the rotation angle. This is achieved via shape optimization of the rotating reflector surfaces. Moreover, a convenient spatial separation of the incoming and outgoing beams is possible. For the sake of example, we present blades that fit into a circle of 10cm diameter. Finally, a prototype of a rotary delay line is fabricated using CNC machining, and its optical properties are characterized.

  18. Ground water elevation monitoring at the Uranium Mill Tailings Remedial Action Salt Lake City, Utah, Vitro processing site

    International Nuclear Information System (INIS)

    1995-04-01

    In February 1994, a ground water level monitoring program was begun at the Vitro processing site. The purpose of the program was to evaluate how irrigating the new golf driving range affected ground water elevations in the unconfined aquifer. The program also evaluated potential impacts of a 9-hole golf course planned as an expansion of the driving range. The planned golf course expansion would increase the area to be irrigated and, thus, the water that could infiltrate the processing site soil to recharge the unconfined aquifer. Increased water levels in the aquifer could alter the ground water flow regime; contaminants in ground water could migrate off the site or could discharge to bodies of surface water in the area. The potential effects of expanding the golf course have been evaluated, and a report is being prepared. Water level data obtained during this monitoring program indicate that minor seasonal mounding may be occurring in response to irrigation of the driving range. However, the effects of irrigation appear small in comparison to the effects of precipitation. There are no monitor wells in the area that irrigation would affect most; that data limitation makes interpretations of water levels and the possibility of ground water mounding uncertain. Limitations of available data are discussed in the conclusion

  19. Synchronization of nonidentical chaotic neural networks with leakage delay and mixed time-varying delays

    Directory of Open Access Journals (Sweden)

    Cao Jinde

    2011-01-01

    Full Text Available Abstract In this paper, an integral sliding mode control approach is presented to investigate synchronization of nonidentical chaotic neural networks with discrete and distributed time-varying delays as well as leakage delay. By considering a proper sliding surface and constructing Lyapunov-Krasovskii functional, as well as employing a combination of the free-weighting matrix method, Newton-Leibniz formulation and inequality technique, a sliding mode controller is designed to achieve the asymptotical synchronization of the addressed nonidentical neural networks. Moreover, a sliding mode control law is also synthesized to guarantee the reachability of the specified sliding surface. The provided conditions are expressed in terms of linear matrix inequalities, and are dependent on the discrete and distributed time delays as well as leakage delay. A simulation example is given to verify the theoretical results.

  20. 78 FR 42945 - Public Water Supply Supervision Program; Program Revision for the State of Oregon

    Science.gov (United States)

    2013-07-18

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9834-9] Public Water Supply Supervision Program; Program... Water Supply Supervision Primacy Program. Oregon has adopted regulations analogous to EPA's Stage 2 Disinfectants and Disinfection Byproducts Rule; Long Term 2 Enhanced Surface Water Treatment Rule; Ground Water...

  1. A Ground-Based Validation System of Teleoperation for a Space Robot

    Directory of Open Access Journals (Sweden)

    Xueqian Wang

    2012-10-01

    Full Text Available Teleoperation of space robots is very important for future on-orbit service. In order to assure the task is accomplished successfully, ground experiments are required to verify the function and validity of the teleoperation system before a space robot is launched. In this paper, a ground-based validation subsystem is developed as a part of a teleoperation system. The subsystem is mainly composed of four parts: the input verification module, the onboard verification module, the dynamic and image workstation, and the communication simulator. The input verification module, consisting of hardware and software of the master, is used to verify the input ability. The onboard verification module, consisting of the same hardware and software as the onboard processor, is used to verify the processor's computing ability and execution schedule. In addition, the dynamic and image workstation calculates the dynamic response of the space robot and target, and generates emulated camera images, including the hand-eye cameras, global-vision camera and rendezvous camera. The communication simulator provides fidelity communication conditions, i.e., time delays and communication bandwidth. Lastly, we integrated a teleoperation system and conducted many experiments on the system. Experiment results show that the ground system is very useful for verified teleoperation technology.

  2. Ground-Water Quality Data in the Owens and Indian Wells Valleys Study Unit, 2006: Results from the California GAMA Program

    Science.gov (United States)

    Densmore, Jill N.; Fram, Miranda S.; Belitz, Kenneth

    2009-01-01

    Ground-water quality in the approximately 1,630 square-mile Owens and Indian Wells Valleys study unit (OWENS) was investigated in September-December 2006 as part of the Priority Basin Project of Groundwater Ambient Monitoring and Assessment (GAMA) Program. The GAMA Priority Basin Project was developed in response to the Groundwater Quality Monitoring Act of 2001 and is being conducted by the U.S. Geological Survey (USGS) in collaboration with the California State Water Resources Control Board (SWRCB). The Owens and Indian Wells Valleys study was designed to provide a spatially unbiased assessment of raw ground-water quality within OWENS study unit, as well as a statistically consistent basis for comparing water quality throughout California. Samples were collected from 74 wells in Inyo, Kern, Mono, and San Bernardino Counties. Fifty-three of the wells were selected using a spatially distributed, randomized grid-based method to provide statistical representation of the study area (grid wells), and 21 wells were selected to evaluate changes in water chemistry in areas of interest (understanding wells). The ground-water samples were analyzed for a large number of synthetic organic constituents [volatile organic compounds (VOCs), pesticides and pesticide degradates, pharmaceutical compounds, and potential wastewater- indicator compounds], constituents of special interest [perchlorate, N-nitrosodimethylamine (NDMA), and 1,2,3- trichloropropane (1,2,3-TCP)], naturally occurring inorganic constituents [nutrients, major and minor ions, and trace elements], radioactive constituents, and microbial indicators. Naturally occurring isotopes [tritium, and carbon-14, and stable isotopes of hydrogen and oxygen in water], and dissolved noble gases also were measured to help identify the source and age of the sampled ground water. This study evaluated the quality of raw ground water in the aquifer in the OWENS study unit and did not attempt to evaluate the quality of treated water

  3. Nuclear nonproliferation: Concerns with US delays in accepting foregin research reactors' spent fuel

    International Nuclear Information System (INIS)

    1994-01-01

    One key US nonproliferation goal is to discourage use of highly enriched uranium fuel (HEU), which can be used to make nuclear bombs, in civilian nuclear programs worldwide. DOE's Off-Site Fuels Policy for taking back spent HEU from foreign research reactors was allowed to expire due to environmental reasons. This report provides information on the effects of delays in renewing the Off-Site Fuels Policy on US nonproliferation goals and programs (specifically the reduced enrichment program), DOE's efforts to renew the fuels policy, and the price to be charged to the operators of foreign reactors for DOE's activities in taking back spent fuel

  4. Synchronization of Markovian jumping stochastic complex networks with distributed time delays and probabilistic interval discrete time-varying delays

    International Nuclear Information System (INIS)

    Li Hongjie; Yue Dong

    2010-01-01

    The paper investigates the synchronization stability problem for a class of complex dynamical networks with Markovian jumping parameters and mixed time delays. The complex networks consist of m modes and the networks switch from one mode to another according to a Markovian chain with known transition probability. The mixed time delays are composed of discrete and distributed delays, the discrete time delay is assumed to be random and its probability distribution is known a priori. In terms of the probability distribution of the delays, the new type of system model with probability-distribution-dependent parameter matrices is proposed. Based on the stochastic analysis techniques and the properties of the Kronecker product, delay-dependent synchronization stability criteria in the mean square are derived in the form of linear matrix inequalities which can be readily solved by using the LMI toolbox in MATLAB, the solvability of derived conditions depends on not only the size of the delay, but also the probability of the delay-taking values in some intervals. Finally, a numerical example is given to illustrate the feasibility and effectiveness of the proposed method.

  5. Dynamics of Nonlinear Time-Delay Systems

    CERN Document Server

    Lakshmanan, Muthusamy

    2010-01-01

    Synchronization of chaotic systems, a patently nonlinear phenomenon, has emerged as a highly active interdisciplinary research topic at the interface of physics, biology, applied mathematics and engineering sciences. In this connection, time-delay systems described by delay differential equations have developed as particularly suitable tools for modeling specific dynamical systems. Indeed, time-delay is ubiquitous in many physical systems, for example due to finite switching speeds of amplifiers in electronic circuits, finite lengths of vehicles in traffic flows, finite signal propagation times in biological networks and circuits, and quite generally whenever memory effects are relevant. This monograph presents the basics of chaotic time-delay systems and their synchronization with an emphasis on the effects of time-delay feedback which give rise to new collective dynamics. Special attention is devoted to scalar chaotic/hyperchaotic time-delay systems, and some higher order models, occurring in different bran...

  6. Delay/Disruption Tolerant Networks (DTN): Testing and Demonstration for Lunar Surface Applications

    Science.gov (United States)

    2009-01-01

    This slide presentation reviews the testing of the Delay/Disruption Tolerant Network (DTN) designed for use with Lunar Surface applications. This is being done through the DTN experimental Network (DEN), that permit access and testing by other NASA centers, DTN team members and protocol developers. The objective of this work is to demonstrate DTN for high return applications in lunar scenarios, provide DEN connectivity with analogs of Constellation elements, emulators, and other resources from DTN Team Members, serve as a wireless communications staging ground for remote analog excursions and enable testing of detailed communication scenarios and evaluation of network performance. Three scenarios for DTN on the Lunar surface are reviewed: Motion imagery, Voice and sensor telemetry, and Navigation telemetry.

  7. Controllability of nonlinear delay oscillating systems

    Directory of Open Access Journals (Sweden)

    Chengbin Liang

    2017-05-01

    Full Text Available In this paper, we study the controllability of a system governed by second order delay differential equations. We introduce a delay Gramian matrix involving the delayed matrix sine, which is used to establish sufficient and necessary conditions of controllability for the linear problem. In addition, we also construct a specific control function for controllability. For the nonlinear problem, we construct a control function and transfer the controllability problem to a fixed point problem for a suitable operator. We give a sufficient condition to guarantee the nonlinear delay system is controllable. Two examples are given to illustrate our theoretical results by calculating a specific control function and inverse of a delay Gramian matrix.

  8. Statistical Delay QoS Provisioning for Energy-Efficient Spectrum-Sharing Based Wireless Ad Hoc Sensor Networks

    Directory of Open Access Journals (Sweden)

    Yichen Wang

    2016-01-01

    Full Text Available In this paper, we develop the statistical delay quality-of-service (QoS provisioning framework for the energy-efficient spectrum-sharing based wireless ad hoc sensor network (WAHSN, which is characterized by the delay-bound violation probability. Based on the established delay QoS provisioning framework, we formulate the nonconvex optimization problem which aims at maximizing the average energy efficiency of the sensor node in the WAHSN while meeting PU’s statistical delay QoS requirement as well as satisfying sensor node’s average transmission rate, average transmitting power, and peak transmitting power constraints. By employing the theories of fractional programming, convex hull, and probabilistic transmission, we convert the original fractional-structured nonconvex problem to the additively structured parametric convex problem and obtain the optimal power allocation strategy under the given parameter via Lagrangian method. Finally, we derive the optimal average energy efficiency and corresponding optimal power allocation scheme by employing the Dinkelbach method. Simulation results show that our derived optimal power allocation strategy can be dynamically adjusted based on PU’s delay QoS requirement as well as the channel conditions. The impact of PU’s delay QoS requirement on sensor node’s energy efficiency is also illustrated.

  9. Delayed rule following

    OpenAIRE

    Schmitt, David R.

    2001-01-01

    Although the elements of a fully stated rule (discriminative stimulus [SD], some behavior, and a consequence) can occur nearly contemporaneously with the statement of the rule, there is often a delay between the rule statement and the SD. The effects of this delay on rule following have not been studied in behavior analysis, but they have been investigated in rule-like settings in the areas of prospective memory (remembering to do something in the future) and goal pursuit. Discriminative even...

  10. Probing the limits of delay intolerance: preliminary young adult data from the Delay Frustration Task (DeFT).

    Science.gov (United States)

    Bitsakou, Paraskevi; Antrop, Inge; Wiersema, Jan Roelf; Sonuga-Barke, Edmund J S

    2006-02-15

    Delay intolerance/aversion is one amongst a number of candidate neuropsychological endophenotypes for ADHD. Pilot data suggest that, because of potential ceiling effects, simple choice measures of delay tolerance used for children are probably not appropriate for adolescents and adults. The Delay Frustration Task (DeFT) is a new measure of delay intolerance, designed to be used in a similar form with adolescents and adults as well as children. In it delay frustration is indexed as the number and duration of responses made on a response key during a series of unpredictable and unsignalled delay periods, which interrupt the completion of a simple computer-based tests. The aim of this study was to provide preliminary data on the applicability of the task in a sample of young adults. The DeFT was administered to 49 male and female undergraduate students selected from a normal population-base. Their mean age was 23.14 (S.D.=1.54). Three measures of delay frustration were recorded across time intervals during the response window; the number of responses, their duration and their combined product (total time button was pressed) was calculated for each second interval bin during the post-response delay period. The AARS and HADS were used as screening questionnaires for ADHD and anxiety behaviour, respectively. The results indicated that young adults with high-ADHD symptoms scores pressed the button more than those with low ADHD scores during the post-response delay condition. While both groups increased responding across time within intervals this was significantly more marked in the high-ADHD symptom group. These effects became more pronounced when anxiety was controlled. Young adults with high-ADHD symptoms appear to be more sensitive to the imposition of unscheduled and unsignalled delay during a simple maths test. DeFT may provide a useful index of delay tolerance in young adults with ADHD. Future research needs to examine DeFT performance in different age groups and

  11. Computation and experiment results of the grounding model of Three Gorges Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Wen Xishan; Zhang Yuanfang; Yu Jianhui; Chen Cixuan [Wuhan University of Hydraulic and Electrical Engineering (China); Qin Liming; Xu Jun; Shu Lianfu [Yangtze River Water Resources Commission, Wuhan (China)

    1999-07-01

    A model for the computation of the grounding parameters of the grids of Three Gorges Power Plant (TGPP) on the Yangtze River is presented in this paper. Using this model computation and analysis of grounding grids is carried out. The results show that reinforcing the grid of the dam is the main body of current dissipation. It must be reliably welded to form a good grounding grid. The experimental results show that the method and program of the computations are correct. (UK)

  12. 76 FR 45253 - Public Water Supply Supervision Program; Program Revision for the State of Alaska

    Science.gov (United States)

    2011-07-28

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9444-8] Public Water Supply Supervision Program; Program... Water Supply Supervision Primacy Program. Alaska has adopted regulations analogous to the EPA's Ground Water Rule. The EPA has determined that these revisions are no less stringent than the corresponding...

  13. Adaptive modification of the delayed feedback control algorithm with a continuously varying time delay

    International Nuclear Information System (INIS)

    Pyragas, V.; Pyragas, K.

    2011-01-01

    We propose a simple adaptive delayed feedback control algorithm for stabilization of unstable periodic orbits with unknown periods. The state dependent time delay is varied continuously towards the period of controlled orbit according to a gradient-descent method realized through three simple ordinary differential equations. We demonstrate the efficiency of the algorithm with the Roessler and Mackey-Glass chaotic systems. The stability of the controlled orbits is proven by computation of the Lyapunov exponents of linearized equations. -- Highlights: → A simple adaptive modification of the delayed feedback control algorithm is proposed. → It enables the control of unstable periodic orbits with unknown periods. → The delay time is varied continuously according to a gradient descend method. → The algorithm is embodied by three simple ordinary differential equations. → The validity of the algorithm is proven by computation of the Lyapunov exponents.

  14. Temperature Dependent Wire Delay Estimation in Floorplanning

    DEFF Research Database (Denmark)

    Winther, Andreas Thor; Liu, Wei; Nannarelli, Alberto

    2011-01-01

    Due to large variations in temperature in VLSI circuits and the linear relationship between metal resistance and temperature, the delay through wires of the same length can be different. Traditional thermal aware floorplanning algorithms use wirelength to estimate delay and routability. In this w......Due to large variations in temperature in VLSI circuits and the linear relationship between metal resistance and temperature, the delay through wires of the same length can be different. Traditional thermal aware floorplanning algorithms use wirelength to estimate delay and routability....... In this work, we show that using wirelength as the evaluation metric does not always produce a floorplan with the shortest delay. We propose a temperature dependent wire delay estimation method for thermal aware floorplanning algorithms, which takes into account the thermal effect on wire delay. The experiment...

  15. Modeling multiple time series annotations as noisy distortions of the ground truth: An Expectation-Maximization approach.

    Science.gov (United States)

    Gupta, Rahul; Audhkhasi, Kartik; Jacokes, Zach; Rozga, Agata; Narayanan, Shrikanth

    2018-01-01

    Studies of time-continuous human behavioral phenomena often rely on ratings from multiple annotators. Since the ground truth of the target construct is often latent, the standard practice is to use ad-hoc metrics (such as averaging annotator ratings). Despite being easy to compute, such metrics may not provide accurate representations of the underlying construct. In this paper, we present a novel method for modeling multiple time series annotations over a continuous variable that computes the ground truth by modeling annotator specific distortions. We condition the ground truth on a set of features extracted from the data and further assume that the annotators provide their ratings as modification of the ground truth, with each annotator having specific distortion tendencies. We train the model using an Expectation-Maximization based algorithm and evaluate it on a study involving natural interaction between a child and a psychologist, to predict confidence ratings of the children's smiles. We compare and analyze the model against two baselines where: (i) the ground truth in considered to be framewise mean of ratings from various annotators and, (ii) each annotator is assumed to bear a distinct time delay in annotation and their annotations are aligned before computing the framewise mean.

  16. Permutation entropy with vector embedding delays

    Science.gov (United States)

    Little, Douglas J.; Kane, Deb M.

    2017-12-01

    Permutation entropy (PE) is a statistic used widely for the detection of structure within a time series. Embedding delay times at which the PE is reduced are characteristic timescales for which such structure exists. Here, a generalized scheme is investigated where embedding delays are represented by vectors rather than scalars, permitting PE to be calculated over a (D -1 ) -dimensional space, where D is the embedding dimension. This scheme is applied to numerically generated noise, sine wave and logistic map series, and experimental data sets taken from a vertical-cavity surface emitting laser exhibiting temporally localized pulse structures within the round-trip time of the laser cavity. Results are visualized as PE maps as a function of embedding delay, with low PE values indicating combinations of embedding delays where correlation structure is present. It is demonstrated that vector embedding delays enable identification of structure that is ambiguous or masked, when the embedding delay is constrained to scalar form.

  17. CGI delay compensation. [Computer Generated Image

    Science.gov (United States)

    Mcfarland, R. E.

    1986-01-01

    Computer-generated graphics in real-time helicopter simulation produces objectionable scene-presentation time delays. In the flight simulation laboratory at Ames Research Center, it has been determined that these delays have an adverse influence on pilot performance during agressive tasks such as nap of the earth (NOE) maneuvers. Using contemporary equipment, computer generated image (CGI) time delays are an unavoidable consequence of the operations required for scene generation. However, providing that magnitude distortions at higher frequencies are tolerable, delay compensation is possible over a restricted frequency range. This range, assumed to have an upper limit of perhaps 10 or 15 rad/sec, conforms approximately to the bandwidth associated with helicopter handling qualities research. A compensation algorithm is introduced here and evaluated in terms of tradeoffs in frequency responses. The algorithm has a discrete basis and accommodates both a large, constant transport delay interval and a periodic delay interval, as associated with asynchronous operations.

  18. New delay-dependent absolute stability criteria for Lur'e systems with time-varying delay

    Science.gov (United States)

    Chen, Yonggang; Bi, Weiping; Li, Wenlin

    2011-07-01

    In this article, the absolute stability problem is investigated for Lur'e systems with time-varying delay and sector-bounded nonlinearity. By employing the delay fractioning idea, the new augmented Lyapunov functional is first constructed. Then, by introducing some slack matrices and by reserving the useful term when estimating the upper bound of the derivative of Lyapunov functional, the new delay-dependent absolute stability criteria are derived in terms of linear matrix inequalities. Several numerical examples are presented to show the effectiveness and the less conservativeness of the proposed method.

  19. Carbon monoxide-induced delayed amnesia, delayed neuronal death and change in acetylcholine concentration in mice

    International Nuclear Information System (INIS)

    Nabeshima, T.; Katoh, A.; Ishimaru, H.; Yoneda, Y.; Ogita, K.; Murase, K.; Ohtsuka, H.; Inari, K.; Fukuta, T.; Kameyama, T.

    1991-01-01

    We investigated the interrelationship of delayed amnesia, delayed neuronal death and changes in acetylcholine concentration induced by carbon monoxide (CO)-exposure in mice. In the test for retention of the passive avoidance task, amnesia was observed 5 and 7 days after CO-exposure when the mice were exposed to CO 1 day after training; in the case when the mice were exposed to CO 5 and 7 days before training, amnesia was also observed in a retention test given 1 day after training. The number of pyramidal cells in the hippocampal CA1 subfield was lower than that of the control 3, 5 and 7 days after CO-exposure. But the neurodegeneration in the parietal cortex, area 1, was not observed until 7 days after CO-exposure. The findings indicated that the amnesia and the neuronal death were produced after a delay when the mice were exposed to CO. In addition, the delayed amnesia was closely related to the delayed neuronal death in the hippocampal CA1 subfield. Moreover, [3H]glutamate and [3H]glycine binding sites did not change after CO-exposure but, 7 days after CO-exposure, the concentration of acetylcholine and the binding of [3H]quinuclidinyl benzilate in the frontal cortex and the striatum were found to have significantly changed, but those in the hippocampus did not show significant change. Therefore, we suggest that delayed amnesia induced by CO-exposure may result from delayed neuronal death in the hippocampal CA1 subfield and dysfunction in the acetylcholinergic neurons, in the frontal cortex, the striatum and/or the hippocampus

  20. Carbon monoxide-induced delayed amnesia, delayed neuronal death and change in acetylcholine concentration in mice

    Energy Technology Data Exchange (ETDEWEB)

    Nabeshima, T.; Katoh, A.; Ishimaru, H.; Yoneda, Y.; Ogita, K.; Murase, K.; Ohtsuka, H.; Inari, K.; Fukuta, T.; Kameyama, T. (Meijo Univ., Nagoya (Japan))

    1991-01-01

    We investigated the interrelationship of delayed amnesia, delayed neuronal death and changes in acetylcholine concentration induced by carbon monoxide (CO)-exposure in mice. In the test for retention of the passive avoidance task, amnesia was observed 5 and 7 days after CO-exposure when the mice were exposed to CO 1 day after training; in the case when the mice were exposed to CO 5 and 7 days before training, amnesia was also observed in a retention test given 1 day after training. The number of pyramidal cells in the hippocampal CA1 subfield was lower than that of the control 3, 5 and 7 days after CO-exposure. But the neurodegeneration in the parietal cortex, area 1, was not observed until 7 days after CO-exposure. The findings indicated that the amnesia and the neuronal death were produced after a delay when the mice were exposed to CO. In addition, the delayed amnesia was closely related to the delayed neuronal death in the hippocampal CA1 subfield. Moreover, (3H)glutamate and (3H)glycine binding sites did not change after CO-exposure but, 7 days after CO-exposure, the concentration of acetylcholine and the binding of (3H)quinuclidinyl benzilate in the frontal cortex and the striatum were found to have significantly changed, but those in the hippocampus did not show significant change. Therefore, we suggest that delayed amnesia induced by CO-exposure may result from delayed neuronal death in the hippocampal CA1 subfield and dysfunction in the acetylcholinergic neurons, in the frontal cortex, the striatum and/or the hippocampus.

  1. Pinning synchronization of the complex networks with non-delayed and delayed coupling

    International Nuclear Information System (INIS)

    Guo Wanli; Austin, Francis; Chen Shihua; Sun Wen

    2009-01-01

    In this Letter, without assuming the symmetry of the coupling matrix, we investigate the global synchronization of the complex networks with non-delayed and delayed coupling based on the pinning controllers. Some sufficient conditions for the global synchronization by adding linear and adaptive feedback controllers to a part of nodes are obtained. Numerical examples are also provided to demonstrate the effectiveness of the theory.

  2. Time Delay Measurements for the Cluster-lensed Sextuple Quasar SDSS J2222+2745

    Science.gov (United States)

    Dahle, H.; Gladders, M. D.; Sharon, K.; Bayliss, M. B.; Rigby, J. R.

    2015-11-01

    We report first results from an ongoing monitoring campaign to measure time delays between the six images of the quasar SDSS J2222+2745, gravitationally lensed by a galaxy cluster. The time delay between A and B, the two most highly magnified images, is measured to be {τ }{{AB}}=47.7+/- 6.0 days (95% confidence interval), consistent with previous model predictions for this lens system. The strong intrinsic variability of the quasar also allows us to derive a time delay value of {τ }{{CA}}=722+/- 24 days between image C and A, in spite of modest overlap between their light curves in the current data set. Image C, which is predicted to lead all the other lensed quasar images, has undergone a sharp, monotonic flux increase of 60%-75% during 2014. A corresponding brightening is firmly predicted to occur in images A and B during 2016. The amplitude of this rise indicates that time delays involving all six known images in this system, including those of the demagnified central images D-F, will be obtainable from further ground-based monitoring of this system during the next few years. Based on observations made with the Nordic Optical Telescope, operated on the island of La Palma jointly by Denmark, Finland, Iceland, Norway, and Sweden, in the Spanish Observatorio del Roque de los Muchachos of the Instituto de Astrofisica de Canarias, and including observations obtained at the Gemini Observatory, which is operated by the Association of Universities for Research in Astronomy, Inc., under a cooperative agreement with the NSF on behalf of the Gemini partnership: the National Science Foundation (United States), the National Research Council (Canada), CONICYT (Chile), the Australian Research Council (Australia), Ministério da Ciência, Tecnologia e Inovação (Brazil) and Ministerio de Ciencia, Tecnologi´a e Innovación Productiva (Argentina).

  3. Hanford Site ground-water monitoring for 1993

    International Nuclear Information System (INIS)

    Dresel, P.E.; Luttrell, S.P.; Evans, J.C.

    1994-09-01

    This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1993 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1993 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site's geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1992 and June 1993. The greatest declines occurred in the 200-West Area. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal. Water levels remained nearly constant in the vicinity of B Pond, as a result of continued disposal to the pond. Water levels measured from wells in the unconfined aquifer north and east of the Columbia River indicate that the primary source of recharge is irrigation practices

  4. Hanford Site ground-water monitoring for 1993

    Energy Technology Data Exchange (ETDEWEB)

    Dresel, P.E.; Luttrell, S.P.; Evans, J.C. [and others

    1994-09-01

    This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1993 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1993 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site`s geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1992 and June 1993. The greatest declines occurred in the 200-West Area. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal. Water levels remained nearly constant in the vicinity of B Pond, as a result of continued disposal to the pond. Water levels measured from wells in the unconfined aquifer north and east of the Columbia River indicate that the primary source of recharge is irrigation practices.

  5. #FakeNobelDelayReasons

    CERN Multimedia

    2013-01-01

    Tuesday’s hour-long delay of the Nobel Prize in Physics announcement was (and still is) quite the cause for speculation. But on the Twittersphere, it was simply the catalyst for some fantastic puns, so-bad-they're-good physics jokes and other shenanigans. Here are some of our favourite #FakeNobelDelayReasons.    

  6. Ground test facilities for evaluating nuclear thermal propulsion engines and fuel elements

    International Nuclear Information System (INIS)

    Allen, G.C.; Beck, D.F.; Harmon, C.D.; Shipers, L.R.

    1992-01-01

    Interagency panels evaluating nuclear thermal propulsion development options have consistently recognized the need for constructing a major new ground test facility to support fuel element and engine testing. This paper summarizes the requirements, configuration, and design issues of a proposed ground test complex for evaluating nuclear thermal propulsion engines and fuel elements being developed for the Space Nuclear Thermal Propulsion (SNTP) program. 2 refs

  7. Delay, doubt, and decision: how delaying a choice reduces the appeal of (descriptively) normative options.

    Science.gov (United States)

    van de Ven, Niels; Gilovich, Thomas; Zeelenberg, Marcel

    2010-04-01

    To help explain a regularity in democratic elections, we examined whether choosing to delay making a choice between a focal option and an alternative tends to make people subsequently less likely to choose what they would otherwise have chosen. The results of two experiments demonstrated that participants who were induced to delay making a decision were indeed less likely to choose the descriptively normative option. An additional experiment that primed a sense of doubt in participants provided support for a self-perception account of this result. Electing to delay making a choice is interpreted as an indication of doubt--doubt that tends to be attributed to the most prominent option. Delay-induced doubt about the normative option makes it less likely to be selected.

  8. Benefits of Delay Tolerant Networking for Earth Science Missions

    Science.gov (United States)

    Davis, Faith; Marquart, Jane; Menke, Greg

    2012-01-01

    To date there has been much discussion about the value of Delay Tolerant Networking (DTN) for space missions. Claims of various benefits, based on paper analysis, are good; however a benefits statement with empirical evidence to support is even better. This paper presents potential and actual advantages of using DTN for Earth science missions based on results from multiple demonstrations, conducted by the Communications, Standards, and Technology Laboratory (CSTL) at NASA Goddard Space Flight Center (GSFC). Demonstrations included two flight demonstrations using the Earth Observing Mission 1 (EO-1) and the Near Earth Network (NEN), a ground based demonstration over satellite links to the Internet Router in Space (IRIS) payload on Intelsat-14, and others using the NASA Tracking Data Relay Satellite System (TDRSS). Real and potential findings include increased flexibility and efficiency in science campaigns, reduced latency in a collaborative science scenario, and improved scientist-instrument communication and control.

  9. Family homework and school-based sex education: delaying early adolescents' sexual behavior.

    Science.gov (United States)

    Grossman, Jennifer M; Frye, Alice; Charmaraman, Linda; Erkut, Sumru

    2013-11-01

    Early sexual activity can undermine adolescents' future school success and health outcomes. The purpose of this study was to assess the role of a family homework component of a comprehensive sex education intervention in delaying sexual initiation for early adolescents and to explore what social and contextual factors prevent adolescents from completing these family homework activities. This mixed methods study included 6th- and 7th-grade survey responses from 706 students at 11 middle school schools receiving a sex education intervention, as well as interviews from a subset of 33, 7th-grade students from the larger sample. Adolescents who completed more family homework assignments were less likely to have vaginal intercourse in 7th grade than those who completed fewer assignments, after controlling for self-reports of having had vaginal intercourse in 6th grade and demographic variables. Participants' explanations for not completing assignments included personal, curriculum, and family-based reasons. Family homework activities designed to increase family communication about sexual issues can delay sex among early adolescents and contribute to school-based sex education programs. Successful sex education programs must identify and address barriers to family homework completion. © 2013, American School Health Association.

  10. Location Estimation using Delayed Measurements

    DEFF Research Database (Denmark)

    Bak, Martin; Larsen, Thomas Dall; Nørgård, Peter Magnus

    1998-01-01

    When combining data from various sensors it is vital to acknowledge possible measurement delays. Furthermore, the sensor fusion algorithm, often a Kalman filter, should be modified in order to handle the delay. The paper examines different possibilities for handling delays and applies a new techn...... technique to a sensor fusion system for estimating the location of an autonomous guided vehicle. The system fuses encoder and vision measurements in an extended Kalman filter. Results from experiments in a real environment are reported...

  11. Analyzing delay causes in Egyptian construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2014-01-01

    Full Text Available Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor’s organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented.

  12. User Delay Cost Model and Facilities Maintenance Cost Model for a Terminal Control Area : Volume 2. User's Manual and Program Documentation for the User Delay Cost Model

    Science.gov (United States)

    1978-05-01

    The User Delay Cost Model (UDCM) is a Monte Carlo simulation of certain classes of movement of air traffic in the Boston Terminal Control Area (TCA). It incorporates a weather module, an aircraft generation module, a facilities module, and an air con...

  13. Robust Moving Horizon H∞ Control of Discrete Time-Delayed Systems with Interval Time-Varying Delays

    Directory of Open Access Journals (Sweden)

    F. Yıldız Tascikaraoglu

    2014-01-01

    Full Text Available In this study, design of a delay-dependent type moving horizon state-feedback control (MHHC is considered for a class of linear discrete-time system subject to time-varying state delays, norm-bounded uncertainties, and disturbances with bounded energies. The closed-loop robust stability and robust performance problems are considered to overcome the instability and poor disturbance rejection performance due to the existence of parametric uncertainties and time-delay appeared in the system dynamics. Utilizing a discrete-time Lyapunov-Krasovskii functional, some delay-dependent linear matrix inequality (LMI based conditions are provided. It is shown that if one can find a feasible solution set for these LMI conditions iteratively at each step of run-time, then we can construct a control law which guarantees the closed-loop asymptotic stability, maximum disturbance rejection performance, and closed-loop dissipativity in view of the actuator limitations. Two numerical examples with simulations on a nominal and uncertain discrete-time, time-delayed systems, are presented at the end, in order to demonstrate the efficiency of the proposed method.

  14. Building a visionary astrophysics program from the ground up

    Science.gov (United States)

    Mathews, Geoffrey S.; Barnes, Joshua Edward; Coleman, Paul; Gal, Roy R.; Meech, Karen J.; Mendez, Roberto Hugo; Nassir, Michael A.; Sanders, David B.

    2015-08-01

    The University of Hawaii’s Institute for Astronomy is in the process of implementing a new Bachelor of Science in Astrophysics at UH Manoa. This requires a significant adjustment in the role of the IfA, which has long been at the forefront of modern astronomy in Hawaii and is now broadening its educational mission. The IfA’s history of excellence in research and access to observational resources are expected to draw students from around the nation and the world. These factors have inspired our programmatic focus culminating in a senior year research experience. We expect that the program will produce many undergraduate astrophysics majors, making it an ideal testbed to apply modern theories of learning to the teaching of astrophysics. We have explicitly designed the major around three pillars: physical theory, the application of physics to astrophysical phenomena, and the development of core observational astronomy skills. We describe our cooperative approach to developing a program-level curriculum map of key concepts and skills, as well as descriptors of student success throughout the program. These are central tools for course design, program assessment, and professional development.

  15. A novel delay-dependent criterion for delayed neural networks of neutral type

    International Nuclear Information System (INIS)

    Lee, S.M.; Kwon, O.M.; Park, Ju H.

    2010-01-01

    This Letter considers a robust stability analysis method for delayed neural networks of neutral type. By constructing a new Lyapunov functional, a novel delay-dependent criterion for the stability is derived in terms of LMIs (linear matrix inequalities). A less conservative stability criterion is derived by using nonlinear properties of the activation function of the neural networks. Two numerical examples are illustrated to show the effectiveness of the proposed method.

  16. Delayed Hepatic Adaptation to Weaning in ACBP(-/-) Mice Is Caused by Disruption of the Epidermal Barrier

    DEFF Research Database (Denmark)

    Neess, Ditte; Bek, Signe; Bloksgaard, Maria

    2013-01-01

    in the skin rather than in the liver. Similarly to ACBP(-/-) mice, K14-ACBP(-/-) mice exhibit an increased transepidermal water loss, and we show that the hepatic phenotype is caused specifically by the epidermal barrier defect, which leads to increased lipolysis in white adipose tissue. Our data demonstrate......We previously reported that mice deficient in acyl-CoA-binding protein (ACBP) display a delayed metabolic adaptation to weaning. This includes a delayed activation of the hepatic lipogenic gene program, which may result from hepatic accumulation of triacylglycerol and/or cholesteryl esters...... in the late suckling period. To further investigate the basis for this phenotype, we generated mice deficient in ACBP in hepatocytes (Alb-ACBP(-/-)) and keratinocytes (K14-ACBP(-/-)). Surprisingly, the delayed adaptation to weaning, including hepatic lipid accumulation, is caused by ACBP deficiency...

  17. In situ influence of coal ash dump on the quality of neighboring surface and ground waters by applying correlation statistic analysis

    Energy Technology Data Exchange (ETDEWEB)

    Jasna M. Djinovic; Aleksandar R. Popovic [University of Belgrade, Belgrade (Serbia and Montenegro). Center of Chemistry, Institute of Chemistry, Technology and Metallurgy

    2007-01-15

    The aim of this study was to establish the real in situ influence of coal ash and slag transport and storage on the quality of neighboring surface and ground waters by applying correlation statistic analysis. It was found that the waste waters from the coal ash dump do not have any influence on the quality of the Danube river water. The Danube and the waste waters, however, influence the quality of the ground waters of the Petka spring. Changes in the concentrations of elements in the Danube or in the waste waters can have immediate or delayed impact on the quality of the spring waters. The immediate impact has calcium, magnesium, zinc, copper, vanadium, cobalt from Danube; magnesium, vanadium from overflow and drainage waters; copper from drainage water. And the delayed impact has calcium, magnesium, vanadium and silicon from the Danube waters, cobalt from drainage waters, chromium and silicon from overflow waters and magnesium and vanadium from both overflow and drainage waters. 20 refs., 2 figs., 4 tabs.

  18. Grounded theory.

    Science.gov (United States)

    Harris, Tina

    2015-04-29

    Grounded theory is a popular research approach in health care and the social sciences. This article provides a description of grounded theory methodology and its key components, using examples from published studies to demonstrate practical application. It aims to demystify grounded theory for novice nurse researchers, by explaining what it is, when to use it, why they would want to use it and how to use it. It should enable nurse researchers to decide if grounded theory is an appropriate approach for their research, and to determine the quality of any grounded theory research they read.

  19. Ground cross-modal impedance as a tool for analyzing ground/plate interaction and ground wave propagation.

    Science.gov (United States)

    Grau, L; Laulagnet, B

    2015-05-01

    An analytical approach is investigated to model ground-plate interaction based on modal decomposition and the two-dimensional Fourier transform. A finite rectangular plate subjected to flexural vibration is coupled with the ground and modeled with the Kirchhoff hypothesis. A Navier equation represents the stratified ground, assumed infinite in the x- and y-directions and free at the top surface. To obtain an analytical solution, modal decomposition is applied to the structure and a Fourier Transform is applied to the ground. The result is a new tool for analyzing ground-plate interaction to resolve this problem: ground cross-modal impedance. It allows quantifying the added-stiffness, added-mass, and added-damping from the ground to the structure. Similarity with the parallel acoustic problem is highlighted. A comparison between the theory and the experiment shows good matching. Finally, specific cases are investigated, notably the influence of layer depth on plate vibration.

  20. The importance of pre-planning for large hydrostatic test programs

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Andrew Keith [WorleyParsons Calgary, Calgary, AB (Canada); Wong, Everett Clementi [Enbridge Pipelines Inc., Edmonton, AB (Canada)

    2010-07-01

    During the design phase of a pipeline project, large hydrostatic test programs are required to locate and secure water sources. Many companies complete hydrostatic test planning through high level desktop analysis, however this technique can result in important unplanned costs and schedule delays. The aim of this paper is to assess the cost benefits of pre-planning large hydrostatic test programs versus the costs of unplanned delays in the execution of hydrostatic testing. This comparison was based on the successful application of pre-planning of 57 mainline hydrostatic tests in the construction of the Line 4 Extension and Alberta Clipper Expansion oil pipelines by Enbridge Pipelines Inc. Results showed that costs of delays and uncertainty during construction far outweigh the costs of pre-planning. This study highlighted that pre-planning for large hydrostatic test programs should be carried out in the execution of large pipeline projects to ensure success.

  1. On development and improvement of evaluation techniques for strong ground motion

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-08-15

    Issues regarding evaluation of active fault and ground motion for formulation of design basis ground motion (Ss) were identified during NISA and NSC seismic safety reviewing activities, which have been conducted in the light of the revision of the relevant seismic regulatory guide in 2006 and the experiences of the Niigataken Chuetsu-oki Earthquake in 2007 and the 2011 off the Pacific Coast of Tohoku Earthquake. In this theme following four subjects were investigated to resolve the important problems for ground motion evaluation, (1) advanced evaluation of ground motion using fault model and uncertainty; (2) improving evaluation of ground motion using attenuation relation of response spectrum; (3) development of advanced technique for ground motion observation and observation tool in deep borehole; (4) improving the evaluation of site effect and seismic wave propagation characteristics. Obtained results will be incorporated into the national safety review and also in the safety standard guidelines of the International Atomic Energy Agency (IAEA) using its Extra-Budgetary Program (IAEA EBP), thereby contributing to technical cooperation in global nuclear seismic safety. (author)

  2. Reasons for diagnostic delay in gynecological malignancies

    DEFF Research Database (Denmark)

    Vandborg, Mai Partridge; Christensen, René dePont Christensen; Kragstrup, Jakob

    2011-01-01

    (≤ or > 60 years), performance of gynecological examination by the GP and notification of cancer suspicion on first referral from GP’s on the diagnostic delay (short delay ≤90 days and long delay >90 days). Results Across cancer type a median total delay of 101 days was observed. The 10% of women......Aim The primary aim of this study was to identify and describe different delay types in women with gynecologic cancer, and to analyze the relationship between diagnostic delay and a number of characteristics for patients, cancers and the health care system. Setting A cohort study of women newly......) and The Danish Gynecological Cancer Database (DGCD). 161 women were included; ovarian cancer: 63, endometrial cancer: 50, cervical cancer: 34 and vulvar cancer: 14. Outcome measures were different delay types counted in days and the influence of four clinical important variables: Presence of alarm symptoms, age...

  3. From Entry to Practice to Advanced Nurse Practitioner - The Progression of Competencies and How They Assist in Delivery of eHealth Programs for Healthy Ageing.

    Science.gov (United States)

    Rodger, Daragh; Hussey, Pamela

    2017-01-01

    Most of the health issues encountered in persons of older age are the result of one or more chronic diseases. The evidence base reports that chronic diseases can be prevented or delayed by engaging in healthy behaviors. Education provides a cost effective intervention on both economic grounds in addition to delivery of optimal patient outcomes. Information and Communication Technology (ICT) increasingly is viewed as a critical utility in eHealth delivery, providing scope for expanding online education facilities for older persons. Developing nursing competencies in the delivery of eHealth solutions to deliver user education programs therefore makes sense. This chapter discusses nursing competencies on the development of targeted eHealth programs for healthy ageing. The role of Advanced Nurse Practitioner in Ireland and its associated competency set identifies how a strong action learning model can be designed to deliver eHealth educational programs for effective delivery of healthy ageing in place.

  4. Discounting of Monetary Rewards That Are Both Delayed and Probabilistic: Delay and Probability Combine Multiplicatively, Not Additively

    Science.gov (United States)

    Vanderveldt, Ariana; Green, Leonard; Myerson, Joel

    2015-01-01

    The value of an outcome is affected both by the delay until its receipt (delay discounting) and by the likelihood of its receipt (probability discounting). Despite being well-described by the same hyperboloid function, delay and probability discounting involve fundamentally different processes, as revealed, for example, by the differential effects…

  5. On development and improvement of evaluation techniques for seismic ground motion

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Issues regarding evaluation of active fault and ground motion for formulation of design basis ground motion (Ss) were prescribed in 'NSC seismic and tsunami safety reviewing manual' in 2012. Moreover, Nuclear Regulation Authority (NRA) is establishing the new seismic safety guideline. In this theme following four subjects were investigated to resolve the important problems for ground motion evaluation, (1) advanced evaluation of ground motion using fault model and uncertainty; (2) improving evaluation of ground motion using attenuation relation of response spectrum; (3) development of advanced and generic techniques for ground motion observation and observation tool in deep borehole; (4) improving the evaluation of site effect and seismic wave propagation characteristics. In addition as emergency requirements from NRA following two subjects were also investigated; (5) hazard evaluation development on fault displacement; (6) ground motion evaluation at near-by source location. Obtained results will be reflected not only in the domestic guideline established by NRA but in the national safety review and also in the safety standard guidelines of the International Atomic Energy Agency (IAEA) through its Extra-Budgetary Program (EBP), thereby contributing to technical cooperation in global nuclear seismic safety. (author)

  6. Hanford Ground-Water Data Base management guide

    International Nuclear Information System (INIS)

    Rieger, J.T.; Mitchell, P.J.; Muffett, D.M.; Fruland, R.M.; Moore, S.B.; Marshall, S.M.

    1990-02-01

    This guide describes the Hanford Ground-Water Data Base (HGWDB), a computerized data base used to store hydraulic head, sample analytical, temperature, geologic, and well-structure information for ground-water monitoring wells on the Hanford Site. These data are stored for the purpose of data retrieval for report generation and also for historical purposes. This guide is intended as an aid to the data base manager and the various staff authorized to enter and verify data, maintain the data base, and maintain the supporting software. This guide focuses on the structure of the HGWDB, providing a fairly detailed description of the programs, files, and parameters. Data-retrieval instructions for the general user of the HGWDB will be found in the HGWDB User's Manual. 6 figs

  7. A Clustered Randomized Controlled Trial of the Positive Prevention PLUS Adolescent Pregnancy Prevention Program.

    Science.gov (United States)

    LaChausse, Robert G

    2016-09-01

    To determine the impact of Positive Prevention PLUS, a school-based adolescent pregnancy prevention program on delaying sexual intercourse, birth control use, and pregnancy. I randomly assigned a diverse sample of ninth grade students in 21 suburban public high schools in California into treatment (n = 2483) and control (n = 1784) groups that participated in a clustered randomized controlled trial. Between October 2013 and May 2014, participants completed baseline and 6-month follow-up surveys regarding sexual behavior and pregnancy. Participants in the treatment group were offered Positive Prevention PLUS, an 11-lesson adolescent pregnancy prevention program. The program had statistically significant impacts on delaying sexual intercourse and increasing the use of birth control. However, I detected no program effect on pregnancy rates at 6-month follow-up. The Positive Prevention PLUS program demonstrated positive impacts on adolescent sexual behavior. This suggests that programs that focus on having students practice risk reduction skills may delay sexual activity and increase birth control use.

  8. Nuclear size and cell division delay

    International Nuclear Information System (INIS)

    Bird, R.P.

    1986-01-01

    Radiation-induced division delay has been linked to damage at the nuclear envelope. Further, cells in G 2 phase are drastically arrested by high LET radiation such that single particles traversing cell nuclei may produce measurable division delay. A modest effort was initiated using two related cell lines of different size, near-diploid cells and near-tetraploid cells of Chinese hamster origin, to compare their sensitivity for radiation-induced division delay. If the nuclear surface is the critical target, then a larger nuclear cross-section presented to an alpha-particle beam should exhibit delay induced by a lesser particle fluence. Preliminary estimates of the extent of delay in asynchronous cultures following low doses of gamma-irradiation or of alpha-irradiation were made by in-situ observation of the time of onset of mitosis and by fixation and staining of cultures to determine the mitotic index as a function of time after irradiation. The basic approach to evaluating division delay will be to use Colecemid to accumulate mitotic cells over a period of time

  9. Competition-strength-dependent ground suppression in figure-ground perception.

    Science.gov (United States)

    Salvagio, Elizabeth; Cacciamani, Laura; Peterson, Mary A

    2012-07-01

    Figure-ground segregation is modeled as inhibitory competition between objects that might be perceived on opposite sides of borders. The winner is the figure; the loser is suppressed, and its location is perceived as shapeless ground. Evidence of ground suppression would support inhibitory competition models and would contribute to explaining why grounds are shapeless near borders shared with figures, yet such evidence is scarce. We manipulated whether competition from potential objects on the ground side of figures was high (i.e., portions of familiar objects were potentially present there) or low (novel objects were potentially present). We predicted that greater competition would produce more ground suppression. The results of two experiments in which suppression was assessed via judgments of the orientation of target bars confirmed this prediction; a third experiment showed that ground suppression is short-lived. Our findings support inhibitory competition models of figure assignment, in particular, and models of visual perception entailing feedback, in general.

  10. A Polynomial Estimate of Railway Line Delay

    DEFF Research Database (Denmark)

    Cerreto, Fabrizio; Harrod, Steven; Nielsen, Otto Anker

    2017-01-01

    Railway service may be measured by the aggregate delay over a time horizon or due to an event. Timetables for railway service may dampen aggregate delay by addition of additional process time, either supplement time or buffer time. The evaluation of these variables has previously been performed...... by numerical analysis with simulation. This paper proposes an analytical estimate of aggregate delay with a polynomial form. The function returns the aggregate delay of a railway line resulting from an initial, primary, delay. Analysis of the function demonstrates that there should be a balance between the two...

  11. Delayed Diagnoses: Nonspecific Findings and Diagnostic Challenges in Eating Disorders

    Directory of Open Access Journals (Sweden)

    Dan Schwarz

    2009-01-01

    Full Text Available Objective. Eating disorders commonly present with nonspecific findings, masquerading as other, more common etiologies of malnutrition and wasting. In low-prevalence populations, these ambiguities can complicate clinicians’ diagnostic reasoning, resulting in delayed or missed diagnoses. Method. We report the atypical case of a 51-year-old male with a five-year history of unexplained weight loss despite extensive past medical evaluation. Previous documentation of profound lymphopenia and bone marrow atrophy had not been linked to a known association with eating disorders. Results. Evaluation for medical etiologies of wasting was negative. Following psychiatric evaluation, the patient was diagnosed with an eating disorder, not otherwise specified, and admitted to a specialized nutritional rehabilitation program. Conclusion. The nonspecific clinical history, physical exam, and laboratory abnormalities of eating disorders can make these diagnoses challenging and delay appropriate treatment. Clinicians should consider eating disorders in patients with malnutrition, severe lymphopenias, and gelatinous marrow transformation early in their workup, so as to avoid potentially negative outcomes.

  12. Delayed Ejaculation

    Science.gov (United States)

    ... cases, it is due to a combination of physical and psychological concerns. Psychological causes of delayed ejaculation include: Depression, anxiety or other mental health conditions Relationship problems due to stress, poor communication ...

  13. Regional analysis of ground and above-ground climate

    Science.gov (United States)

    1981-12-01

    The regional suitability of underground construction as a climate control technique is discussed with reference to (1) a bioclimatic analysis of long term weather data for 29 locations in the United States to determine appropriate above ground climate control techniques, (2) a data base of synthesized ground temperatures for the coterminous United States, and (3) monthly dew point ground temperature comparisons for identifying the relative likelihood of condensation from one region to another. It is concluded that the suitability of Earth tempering as a practice and of specific Earth sheltered design stereotypes varies geographically; while the subsurface almost always provides a thermal advantage on its own terms when compared to above ground climatic data, it can, nonetheless, compromise the effectiveness of other, regionally more important climate control techniques. Reviews of above and below ground climate mapping schemes related to human comfort and architectural design, and detailed description of a theoretical model of ground temperature, heat flow, and heat storage in the ground are included. Strategies of passive climate control are presented in a discussion of the building bioclimatic analysis procedure which has been applied in a computer analysis of 30 years of weather data for each of 20 locations in the United States.

  14. Regional analysis of ground and above-ground climate

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    The regional suitability of underground construction as a climate control technique is discussed with reference to (1) a bioclimatic analysis of long-term weather data for 29 locations in the United States to determine appropriate above ground climate control techniques, (2) a data base of synthesized ground temperatures for the coterminous United States, and (3) monthly dew point ground temperature comparisons for identifying the relative likelihood of condensation from one region to another. It is concluded that the suitability of earth tempering as a practice and of specific earth-sheltered design stereotypes varies geographically; while the subsurface almost always provides a thermal advantage on its own terms when compared to above ground climatic data, it can, nonetheless, compromise the effectiveness of other, regionally more important climate control techniques. Also contained in the report are reviews of above and below ground climate mapping schemes related to human comfort and architectural design, and detailed description of a theoretical model of ground temperature, heat flow, and heat storage in the ground. Strategies of passive climate control are presented in a discussion of the building bioclimatic analysis procedure which has been applied in a computer analysis of 30 years of weather data for each of 29 locations in the United States.

  15. Time Delay Estimation Algoritms for Echo Cancellation

    Directory of Open Access Journals (Sweden)

    Kirill Sakhnov

    2011-01-01

    Full Text Available The following case study describes how to eliminate echo in a VoIP network using delay estimation algorithms. It is known that echo with long transmission delays becomes more noticeable to users. Thus, time delay estimation, as a part of echo cancellation, is an important topic during transmission of voice signals over packetswitching telecommunication systems. An echo delay problem associated with IP-based transport networks is discussed in the following text. The paper introduces the comparative study of time delay estimation algorithm, used for estimation of the true time delay between two speech signals. Experimental results of MATLab simulations that describe the performance of several methods based on cross-correlation, normalized crosscorrelation and generalized cross-correlation are also presented in the paper.

  16. Empowering families by engaging and relating Murri way: a grounded theory study of the implementation of the Cape York Baby Basket program.

    Science.gov (United States)

    McCalman, Janya; Searles, Andrew; Bainbridge, Roxanne; Ham, Rachael; Mein, Jacki; Neville, Johanna; Campbell, Sandra; Tsey, Komla

    2015-05-21

    Evaluating program outcomes without considering how the program was implemented can cause misunderstandings and inefficiencies when initiating program improvements. In conjunction with a program evaluation, reported elsewhere, this paper theorises the process of implementing an Indigenous Australian maternal and child health program. The Baby Basket program was developed in 2009 for the remote Cape York region and aimed to improve the attendance and engagement of Indigenous women at antenatal and postnatal clinics through providing three baskets of maternal and baby goods and associated health education. Constructivist grounded theory methods were used to generate and analyse data from qualitative interviews and focus groups with Indigenous women who received the baskets, their extended family members, and healthcare workers who delivered them. Data was coded in NVivo with concepts iteratively compared until higher order constructs and their relationships could be modelled to explain the common purpose for participants, the process involved in achieving that purpose, key strategies, conditions and outcomes. Theoretical terms are italicised. Program implementation entailed empowering families through a process of engaging and relating Murri (Queensland Indigenous) way. Key influencing conditions of the social environment were the remoteness of communities, keeping up with demand, families' knowledge, skills and roles and organisational service approaches and capacities. Engaging and relating Murri way occurred through four strategies: connecting through practical support, creating a culturally safe practice, becoming informed and informing others, and linking at the clinic. These strategies resulted in women and families taking responsibility for health through making healthy choices, becoming empowered health consumers and advocating for community changes. The theoretical model was applied to improve and revise Baby Basket program implementation, including

  17. Delayed growth

    Science.gov (United States)

    ... Slow rate of growth; Retarded growth and development; Growth delay Images Toddler development References Cooke DW, Divall SA, Radovick S. Normal and aberrant growth in children. In: Melmed S, Polonsky KS, Larsen PR, ...

  18. Topology identification of the complex networks with non-delayed and delayed coupling

    International Nuclear Information System (INIS)

    Guo Wanli; Chen Shihua; Sun Wen

    2009-01-01

    In practical situation, there exists many uncertain information in complex networks, such as the topological structures. So the topology identification is an important issue in the research of the complex networks. Based on LaSalle's invariance principle, in this Letter, an adaptive controlling method is proposed to identify the topology of a weighted general complex network model with non-delayed and delayed coupling. Finally, simulation results show that the method is effective.

  19. Delay-independent stability of genetic regulatory networks.

    Science.gov (United States)

    Wu, Fang-Xiang

    2011-11-01

    Genetic regulatory networks can be described by nonlinear differential equations with time delays. In this paper, we study both locally and globally delay-independent stability of genetic regulatory networks, taking messenger ribonucleic acid alternative splicing into consideration. Based on nonnegative matrix theory, we first develop necessary and sufficient conditions for locally delay-independent stability of genetic regulatory networks with multiple time delays. Compared to the previous results, these conditions are easy to verify. Then we develop sufficient conditions for global delay-independent stability for genetic regulatory networks. Compared to the previous results, this sufficient condition is less conservative. To illustrate theorems developed in this paper, we analyze delay-independent stability of two genetic regulatory networks: a real-life repressilatory network with three genes and three proteins, and a synthetic gene regulatory network with five genes and seven proteins. The simulation results show that the theorems developed in this paper can effectively determine the delay-independent stability of genetic regulatory networks.

  20. Behavioral effects of delayed timeouts from reinforcement.

    Science.gov (United States)

    Byrne, Tom; Poling, Alan

    2017-03-01

    Timeouts are sometimes used in applied settings to reduce target responses, and in some circumstances delays are unavoidably imposed between the onset of a timeout and the offset of the response that produces it. The present study examined the effects of signaled and unsignaled timeouts in rats exposed to concurrent fixed-ratio 1 fixed-ratio 1 schedules of food delivery, where each response on one lever, the location of which changed across conditions, produced both food and a delayed 10-s timeout. Delays of 0 to 38 s were examined. Delayed timeouts often, but not always, substantially reduced the number of responses emitted on the lever that produced timeouts relative to the number emitted on the lever that did not produce timeouts. In general, greater sensitivity was observed to delayed timeouts when they were signaled. These results demonstrate that delayed timeouts, like other delayed consequences, can affect behavior, albeit less strongly than immediate consequences. © 2017 Society for the Experimental Analysis of Behavior.

  1. Exponential Antisynchronization Control of Stochastic Memristive Neural Networks with Mixed Time-Varying Delays Based on Novel Delay-Dependent or Delay-Independent Adaptive Controller

    Directory of Open Access Journals (Sweden)

    Minghui Yu

    2017-01-01

    Full Text Available The global exponential antisynchronization in mean square of memristive neural networks with stochastic perturbation and mixed time-varying delays is studied in this paper. Then, two kinds of novel delay-dependent and delay-independent adaptive controllers are designed. With the ability of adapting to environment changes, the proposed controllers can modify their behaviors to achieve the best performance. In particular, on the basis of the differential inclusions theory, inequality theory, and stochastic analysis techniques, several sufficient conditions are obtained to guarantee the exponential antisynchronization between the drive system and response system. Furthermore, two numerical simulation examples are provided to the validity of the derived criteria.

  2. Permissible Delay in Payments

    Directory of Open Access Journals (Sweden)

    Yung-Fu Huang

    2007-01-01

    Full Text Available The main purpose of this paper wants to investigate the optimal retailer's lot-sizing policy with two warehouses under partially permissible delay in payments within the economic order quantity (EOQ framework. In this paper, we want to extend that fully permissible delay in payments to the supplier would offer the retailer partially permissible delay in payments. That is, the retailer must make a partial payment to the supplier when the order is received. Then the retailer must pay off the remaining balance at the end of the permissible delay period. In addition, we want to add the assumption that the retailer's storage space is limited. That is, the retailer will rent the warehouse to store these exceeding items when the order quantity is larger than retailer's storage space. Under these conditions, we model the retailer's inventory system as a cost minimization problem to determine the retailer's optimal cycle time and optimal order quantity. Three theorems are developed to efficiently determine the optimal replenishment policy for the retailer. Finally, numerical examples are given to illustrate these theorems and obtained a lot of managerial insights.

  3. Program Planning in Health Professions Education

    Science.gov (United States)

    Schmidt, Steven W.; Lawson, Luan

    2018-01-01

    In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.

  4. How do patients access the private sector in Chennai, India? An evaluation of delays in tuberculosis diagnosis.

    Science.gov (United States)

    Bronner Murrison, L; Ananthakrishnan, R; Swaminathan, A; Auguesteen, S; Krishnan, N; Pai, M; Dowdy, D W

    2016-04-01

    The diagnosis and treatment of tuberculosis (TB) in India are characterized by heavy private-sector involvement. Delays in treatment remain poorly characterized among patients seeking care in the Indian private sector. To assess delays in TB diagnosis and treatment initiation among patients diagnosed in the private sector, and pathways to care in an urban setting. Cross-sectional survey of 289 consecutive patients diagnosed with TB in the private sector and referred for anti-tuberculosis treatment through a public-private mix program in Chennai from January 2014 to February 2015. Among 212 patients with pulmonary TB, 90% first contacted a formal private provider, and 78% were diagnosed by the first or second provider seen after a median of three visits per provider. Median total delay was 51 days (mean 68). Consulting an informal (rather than formally trained) provider first was associated with significant increases in total delay (absolute increase 22.8 days, 95%CI 6.2-39.5) and in the risk of prolonged delay >90 days (aRR 2.4, 95%CI 1.3-4.4). Even among patients seeking care in the formal (vs. informal) private sector in Chennai, diagnostic delays are substantial. Novel strategies are required to engage private providers, who often serve as the first point of contact.

  5. Hydrogeology of the 200 Areas low-level burial grounds: An interim report: Volume 1, Text

    Energy Technology Data Exchange (ETDEWEB)

    Last, G.V.; Bjornstad, B.N.; Bergeron, M.P.; Wallace, D.W.; Newcomer, D.R.; Schramke, J.A.; Chamness, M.A.; Cline, C.S.; Airhart, S.P.; Wilbur, J.S.

    1989-01-01

    This report presents information derived from the installation of 35 ground-water monitoring wells around six low-level radioactive/hazardous waste burial grounds located in the 200 Areas of the Hanford Site in southeastern Washington State. This information was collected between May 20, 1987 and August 1, 1988. The contents of this report have been divided into two volumes. This volume contains the main text. Volume 2 contains the appendixes, including data and supporting information that verify content and results found in the main text. This report documents information collected by the Pacific Northwest Laboratory at the request of Westinghouse Hanford Company. Presented in this report are the preliminary interpretations of the hydrogeologic environment of six low-level burial grounds, which comprise four waste management areas (WMAs) located in the 200 Areas of the Hanford Site. This information and its accompanying interpretations were derived from sampling and testing activities associated with the construction of 35 ground-water monitoring wells as well as a multitude of previously existing boreholes. The new monitoring wells were installed as part of a ground-water monitoring program initiated in 1986. This ground-water monitoring program is based on requirements for interim status facilities in compliance with the Resource Conservation and Recovery Act (1976).

  6. Use of rapid needs assessment as a tool to identify vaccination delays in Guatemala and Peru.

    Science.gov (United States)

    D'Ardenne, Katie K; Darrow, Juliana; Furniss, Anna; Chavez, Catia; Hernandez, Herminio; Berman, Stephen; Asturias, Edwin J

    2016-03-29

    To explore the use of rapid needs assessment (RNA) surveys to determine the prevalence and factors contributing to delays in vaccination of children in two low middle-income countries (LMIC). Data from two RNA surveys performed as part of program improvement evaluations in Guatemala and Peru were used for this analysis. The primary endpoint was the timeliness of immunization with delay defined as administration of vaccines beyond 28 days from recommended age for DTwP-HepB-Hib (Penta) and measles-mumps-rubella (MMR) vaccines, as well as past age-restrictions for rotavirus vaccine. Independent risk factors analyzed included child's gender, birth year, number of children in household, maternal age, maternal education, and food insecurity. Vaccine information was available from 811 children from 838 households surveyed. High rate of immunization delays was observed, with 75.6% of children in Guatemala and 57.8% of children in Peru being delayed for the third dose of Penta primary series. Factors associated with delayed vaccination in Guatemala included advanced maternal age and increased number of children in household. In Peru, significant associations were birth year before 2009, lower maternal education level, and increased number of children in household. RNA is a fast and effective method to identify timely vaccine coverage and derive a hypothesis of factors possibly associated with vaccination delay. Copyright © 2016 Elsevier Ltd. All rights reserved.

  7. Ionospheric errors compensation for ground deformation estimation with new generation SAR

    Science.gov (United States)

    Gomba, Giorgio; De Zan, Francesco; Rodriguez Gonzalez, Fernando

    2017-04-01

    Synthetic aperture radar (SAR) and interferometric SAR (InSAR) measurements are disturbed by the propagation velocity changes of microwaves that are caused by the high density of free electrons in the ionosphere. Most affected are low-frequency (L- or P-band) radars, as the recently launched ALOS-2 and the future Tandem-L and NISAR, although higher frequency (C- or X-band) systems, as the recently launched Sentinel-1, are not immune. Since the ionosphere is an obstacle to increasing the precision of new generation SAR systems needed to remotely measure the Earth's dynamic processes as for example ground deformation, it is necessary to estimate and compensate ionospheric propagation delays in SAR signals. In this work we discuss about the influence of the ionosphere on interferograms and the possible correction methods with relative accuracies. Consequently, the effect of ionospheric induced errors on ground deformation measurements prior and after ionosphere compensation will be analyzed. Examples will be presented of corrupted measurements of earthquakes and fault motion along with the corrected results using different methods.

  8. Periodic flows to chaos in time-delay systems

    CERN Document Server

    Luo, Albert C J

    2017-01-01

    This book for the first time examines periodic motions to chaos in time-delay systems, which exist extensively in engineering. For a long time, the stability of time-delay systems at equilibrium has been of great interest from the Lyapunov theory-based methods, where one cannot achieve the ideal results. Thus, time-delay discretization in time-delay systems was used for the stability of these systems. In this volume, Dr. Luo presents an accurate method based on the finite Fourier series to determine periodic motions in nonlinear time-delay systems. The stability and bifurcation of periodic motions are determined by the time-delayed system of coefficients in the Fourier series and the method for nonlinear time-delay systems is equivalent to the Laplace transformation method for linear time-delay systems. Facilitates discovery of analytical solutions of nonlinear time-delay systems; Illustrates bifurcation trees of periodic motions to chaos; Helps readers identify motion complexity and singularity; Explains pro...

  9. Delay Variation Model with Two Service Queues

    Directory of Open Access Journals (Sweden)

    Filip Rezac

    2010-01-01

    Full Text Available Delay in VoIP technology is very unpleasant issue and therefore a voice packets prioritization must be ensured. To maintain the high call quality a maximum information delivery time from the sender to the recipient is set to 150 ms. This paper focuses on the design of a mathematical model of end-to-end delay of a VoIP connection, in particular on a delay variation. It describes all partial delay components and mechanisms, their generation, facilities and mathematical formulations. A new approach to the delay variation model is presented and its validation has been done by experimention.

  10. Goodwin accelerator model revisited with fixed time delays

    Science.gov (United States)

    Matsumoto, Akio; Merlone, Ugo; Szidarovszky, Ferenc

    2018-05-01

    Dynamics of Goodwin's accelerator business cycle model is reconsidered. The model is characterized by a nonlinear accelerator and an investment time delay. The role of the nonlinearity for the birth of persistent oscillations is fully discussed in the existing literature. On the other hand, not much of the role of the delay has yet been revealed. The purpose of this paper is to show that the delay really matters. In the original framework of Goodwin [6], it is first demonstrated that there is a threshold value of the delay: limit cycles arise for smaller values than the threshold and so do sawtooth oscillations for larger values. In the extended framework in which a consumption or saving delay, in addition to the investment delay, is introduced, three main results are demonstrated under assumption of the identical length of investment and consumption delays. The dynamics with consumption delay is basically the same as that of the single delay model. Second, in the case of saving delay, the steady state can coexist with the stable and unstable limit cycles in the stable case. Third, in the unstable case, there is an interval of delay in which the limit cycle or the sawtooth oscillation emerges depending on the choice of the constant initial function.

  11. Distributed operating system for NASA ground stations

    Science.gov (United States)

    Doyle, John F.

    1987-01-01

    NASA ground stations are characterized by ever changing support requirements, so application software is developed and modified on a continuing basis. A distributed operating system was designed to optimize the generation and maintenance of those applications. Unusual features include automatic program generation from detailed design graphs, on-line software modification in the testing phase, and the incorporation of a relational database within a real-time, distributed system.

  12. Plug and Play Realtime Diagnosis for Ground Processing System Integration, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's "Ground Systems Development and Operations Program" is moving towards transforming parts of the Kennedy Space Center from a historically government-only...

  13. Stage at diagnosis and delay in seeking medical care among women with breast cancer, delhi, India.

    Science.gov (United States)

    Pakseresht, Sedigheh; Ingle, Gopal Krishna; Garg, Suneela; Sarafraz, Nahid

    2014-12-01

    Patients with cancer often delay seeking medical advice in developing countries. It can adversely influence the outcome of disease. The present study was performed to determine the stage at diagnosis and delay in seeking medical care among women with breast cancer in Delhi, India. This was a cross-sectional study based on a census (case series) approach to reach all women (172) diagnosed with primary breast cancer "detected in surgery Out Patient Department (OPD) from January 2007 to December 2009" at Lok Nayak Hospital, Delhi, India. Patients were interviewed using a self-structure questionnaire. Seeking behavior variables were awareness of problem, first consultation, followed physician's advice, detection of problem, system of medicine and gap between knowing the problem and consultation (patient delay). Statistical Analysis was performed using the Microsoft SPSS-pc version 14.0 statistical program. The analytic methods were used (mean, standard deviation, X(2), Fisher's Exact Test, K-S, Kruskal-Wallis) for variables. All statistical tests were performed at a significance level of 5% (P cancer at the time of diagnosis. The mean duration of gap between knowing the problem and consulting a physician (patients delay) was 10.90 months. There was no significant association between stage of cancer and consultation gap. A significant association was found between the stage of breast cancer and income; women with lower income had a higher stage of breast cancer (P breast cancer. It seems necessary to design educating programs for women in both clinical and community settings, about breast cancer and early detection practices.

  14. Ground water '89

    International Nuclear Information System (INIS)

    1989-01-01

    The proceedings of the 5th biennial symposium of the Ground Water Division of the Geological Society of South Africa are presented. The theme of the symposium was ground water and mining. Papers were presented on the following topics: ground water resources; ground water contamination; chemical analyses of ground water and mining and its influece on ground water. Separate abstracts were prepared for 5 of the papers presented. The remaining papers were considered outside the subject scope of INIS

  15. The reasons for delay lumbar puncture

    Directory of Open Access Journals (Sweden)

    MH. Lotfi

    2017-04-01

    Full Text Available Early diagnosis of meningitis and encephalitis and prompt initiation of appropriate therapy is vital and any delay will lead to high mortality and serious and permanent morbidity. The main purpose of this study was to evaluate the management of 220 patients with suspected central nervous system (CNS infections (meningitis and encephalitis to determine the percentage of patients’ suspected CNS infection undergo lumbar puncture in acceptable time (in accordance with conventional algorithms. In this descriptive study, patients with suspected CNS infections admitted to Bu-Ali and Qods hospitals, in the period July 2013 to December 2015 were studied. Information of 220 patients was collected. Continuous variables were summarized as means ± standard deviation and categorical variables as frequencies and percentages. Lumbar puncture (LP in patients was delayed in 200 cases (91%. Most common causes of delay in performing LP were prolongation of the process of determining patient needs to puncture, satisfying patients, CT scan delay and the delay in allowing LP by neurologist. In this study, delaying LP rate was higher than other studies. It seems certain pattern in assistants’ visits for counseling. CT requests and neurologic consultation before LP performed for all adult patients.

  16. Death Valley regional ground-water flow system, Nevada and California -- hydrogeologic framework and transient ground-water flow model

    Science.gov (United States)

    Belcher, Wayne R.

    2004-01-01

    A numerical three-dimensional (3D) transient ground-water flow model of the Death Valley region was developed by the U.S. Geological Survey for the U.S. Department of Energy programs at the Nevada Test Site and at Yucca Mountain, Nevada. Decades of study of aspects of the ground-water flow system and previous less extensive ground-water flow models were incorporated and reevaluated together with new data to provide greater detail for the complex, digital model. A 3D digital hydrogeologic framework model (HFM) was developed from digital elevation models, geologic maps, borehole information, geologic and hydrogeologic cross sections, and other 3D models to represent the geometry of the hydrogeologic units (HGUs). Structural features, such as faults and fractures, that affect ground-water flow also were added. The HFM represents Precambrian and Paleozoic crystalline and sedimentary rocks, Mesozoic sedimentary rocks, Mesozoic to Cenozoic intrusive rocks, Cenozoic volcanic tuffs and lavas, and late Cenozoic sedimentary deposits of the Death Valley Regional Ground-Water Flow System (DVRFS) region in 27 HGUs. Information from a series of investigations was compiled to conceptualize and quantify hydrologic components of the ground-water flow system within the DVRFS model domain and to provide hydraulic-property and head-observation data used in the calibration of the transient-flow model. These studies reevaluated natural ground-water discharge occurring through evapotranspiration and spring flow; the history of ground-water pumping from 1913 through 1998; ground-water recharge simulated as net infiltration; model boundary inflows and outflows based on regional hydraulic gradients and water budgets of surrounding areas; hydraulic conductivity and its relation to depth; and water levels appropriate for regional simulation of prepumped and pumped conditions within the DVRFS model domain. Simulation results appropriate for the regional extent and scale of the model were

  17. Delays and networked control systems

    CERN Document Server

    Hetel, Laurentiu; Daafouz, Jamal; Johansson, Karl

    2016-01-01

    This edited monograph includes state-of-the-art contributions on continuous time dynamical networks with delays. The book is divided into four parts. The first part presents tools and methods for the analysis of time-delay systems with a particular attention on control problems of large scale or infinite-dimensional systems with delays. The second part of the book is dedicated to the use of time-delay models for the analysis and design of Networked Control Systems. The third part of the book focuses on the analysis and design of systems with asynchronous sampling intervals which occur in Networked Control Systems. The last part of the book exposes several contributions dealing with the design of cooperative control and observation laws for networked control systems. The target audience primarily comprises researchers and experts in the field of control theory, but the book may also be beneficial for graduate students. .

  18. A scheme to expand the delay-bandwidth product in the resonator-based delay lines by optical OFDM technique

    DEFF Research Database (Denmark)

    Zhu, Jiangbo; Tao, Li; Zhang, Ziran

    2013-01-01

    We propose a novel scheme to expand the inherent limit in the product of the optical delay and the transmission bandwidth in resonator-based delay lines, with the optical orthogonal frequency division multiplexing (OOFDM) technique. The optical group delay properties of a single ring resonator we...

  19. 13 CFR 125.26 - What are the grounds for filing an SDVO SBC protest?

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the grounds for filing an... GOVERNMENT CONTRACTING PROGRAMS Protests Concerning SDVO SBCs § 125.26 What are the grounds for filing an..., spouse or permanent caregiver of such veteran. [70 FR 14527, Mar. 23, 2005, as amended at 72 FR 50041...

  20. TTSA: An Effective Scheduling Approach for Delay Bounded Tasks in Hybrid Clouds.

    Science.gov (United States)

    Yuan, Haitao; Bi, Jing; Tan, Wei; Zhou, MengChu; Li, Bo Hu; Li, Jianqiang

    2017-11-01

    The economy of scale provided by cloud attracts a growing number of organizations and industrial companies to deploy their applications in cloud data centers (CDCs) and to provide services to users around the world. The uncertainty of arriving tasks makes it a big challenge for private CDC to cost-effectively schedule delay bounded tasks without exceeding their delay bounds. Unlike previous studies, this paper takes into account the cost minimization problem for private CDC in hybrid clouds, where the energy price of private CDC and execution price of public clouds both show the temporal diversity. Then, this paper proposes a temporal task scheduling algorithm (TTSA) to effectively dispatch all arriving tasks to private CDC and public clouds. In each iteration of TTSA, the cost minimization problem is modeled as a mixed integer linear program and solved by a hybrid simulated-annealing particle-swarm-optimization. The experimental results demonstrate that compared with the existing methods, the optimal or suboptimal scheduling strategy produced by TTSA can efficiently increase the throughput and reduce the cost of private CDC while meeting the delay bounds of all the tasks.

  1. Advanced gamma ray balloon experiment ground checkout and data analysis

    Science.gov (United States)

    Blackstone, M.

    1976-01-01

    A software programming package to be used in the ground checkout and handling of data from the advanced gamma ray balloon experiment is described. The Operator's Manual permits someone unfamiliar with the inner workings of the software system (called LEO) to operate on the experimental data as it comes from the Pulse Code Modulation interface, converting it to a form for later analysis, and monitoring the program of an experiment. A Programmer's Manual is included.

  2. Delays in Building Construction Projects in Ghana

    Directory of Open Access Journals (Sweden)

    Adwoa B Agyakwah-Baah

    2010-07-01

    Full Text Available This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified from the literature and semi-structured interviews of 15 key players in the implementation process. These delay factors were further categorised into nine major groups. The list of delay causes was subjected to a questionnaire survey for the identification of the most important causes of delay. The field survey included 130 respondents made up of 39 contractors, 37 clients and 54 consultants. The relative importance of the individual causes and the groups were calculated and ranked by their relative importance index. The overall results of the study indicate that the respondents generally agree that financial group factors ranked highest among the major factors causing delay in construction projects in Ghana. The financial group factors were delay in honouring payment certificates, difficulty in accessing credit and fluctuation in prices. Materials group factors are second followed by scheduling and controlling factors.

  3. Picosecond resolution programmable delay line

    International Nuclear Information System (INIS)

    Suchenek, Mariusz

    2009-01-01

    The note presents implementation of a programmable delay line for digital signals. The tested circuit has a subnanosecond delay range programmable with a resolution of picoseconds. Implementation of the circuit was based on low-cost components, easily available on the market. (technical design note)

  4. Electrically tunable photonic true-time-delay line.

    Science.gov (United States)

    Barmenkov, Yuri O; Cruz, José Luis; Díez, Antonio; Andrés, Miguel V

    2010-08-16

    We present a new application of the acousto-optic superlattice modulation of a fiber Bragg grating based on the dynamic phase and group delay properties of this fiber-optic component. We demonstrate a tunable photonic true-time-delay line based on the group delay change of the light reflected from the grating sidebands. The delay is electrically tuned by adjusting the voltage applied to a piezoelectric transducer that generates the acoustic wave propagating along the grating. In our experiments, a true-time delay of 400 ps is continuously adjusted (300 ps within the 3 dB amplitude range of the first sideband), using a 12 cm long uniform grating.

  5. A hardware-in-the-loop simulation program for ground-based radar

    Science.gov (United States)

    Lam, Eric P.; Black, Dennis W.; Ebisu, Jason S.; Magallon, Julianna

    2011-06-01

    A radar system created using an embedded computer system needs testing. The way to test an embedded computer system is different from the debugging approaches used on desktop computers. One way to test a radar system is to feed it artificial inputs and analyze the outputs of the radar. More often, not all of the building blocks of the radar system are available to test. This will require the engineer to test parts of the radar system using a "black box" approach. A common way to test software code on a desktop simulation is to use breakpoints so that is pauses after each cycle through its calculations. The outputs are compared against the values that are expected. This requires the engineer to use valid test scenarios. We will present a hardware-in-the-loop simulator that allows the embedded system to think it is operating with real-world inputs and outputs. From the embedded system's point of view, it is operating in real-time. The hardware in the loop simulation is based on our Desktop PC Simulation (PCS) testbed. In the past, PCS was used for ground-based radars. This embedded simulation, called Embedded PCS, allows a rapid simulated evaluation of ground-based radar performance in a laboratory environment.

  6. Factors Responsible for the Diagnostic Delay in Oral Cancer Patients: A Hospital Based Sociodemographic Study in Kolkata

    Directory of Open Access Journals (Sweden)

    Pramitasri Bhattacharyya

    2016-12-01

    Full Text Available Introduction Oral cancer is a challenging health problem globally. Delay in diagnosis is an important factor in determining the outcome of the disease. It is a major determinant of mortality and morbidity of oral cancer patients. Present observational study was conducted with the objective of finding the factors responsible for delay in diagnosis of oral cancer in patients. Materials and Methods Hospital based observational study where patient register was used as data source from 15th Nov, 2013-15th Jan, 2014. Results Among the causes for delay in reporting to hospital, financial constraint (84% and illiteracy (56.5% have been found to contribute the most. The risk of primary delay is 3.53 times more among illiterate in comparison with literate. Age, gender, stage of cancer, religion, caste, tobacco use and delayed referral from the first physician were the other factors found to be significant in relation to primary delay. Discussion Early diagnosis is a major factor for favorable outcome of a disease and several factors hinder early diagnosis. Some of these factors can be easily modified through Information, Education and Communication (IEC. Conclusion Some important factors that lead to delay are identified and some of them are preventable. So, IEC regarding cancer among general population will not only provide knowledge to them, but also will break myths regarding cancer and reduce the burden of disease. These identified predictors of delay may be used for designing an educational intervention program for patients with oral cancers.

  7. Some unusual discrete VLF emissions observed at a low-latitude ground station at Agra

    Directory of Open Access Journals (Sweden)

    B. Singh

    1997-08-01

    Full Text Available A detailed analysis of the VLF emissions data obtained during occasional whistler campaigns at the low-latitude ground station Agra (geomagnetic latitude 17°1' N, L = 1.15 has yielded some unusual discrete VLF emissions of the rising type. These include (1 emissions occurring at time intervals increasing in ge ommetrical progression, (2 emissions occuring simulta neously in different frequency ranges and (3 emissions observed during daytime. In the present study, the observed characteristics of these emissions are described and interpreted. It is shown that the increasing time delay between different components of the emissions match closely with the propagation time delays between different hops of a whistler of dispersion 19 s1/2, the unusual occurrence of the emissions in two different frequency ranges approximately at the same time may possibly be linked with their generation at two different locations, and the occurrence of emissions during daytime may be due to propagation under the influence of equatorial anomaly.

  8. Flapping current sheet with superposed waves seen in space and on the ground

    Science.gov (United States)

    Wang, Guoqiang; Volwerk, Martin; Nakamura, Rumi; Boakes, Peter; Zhang, Tielong; Ge, Yasong; Yoshikawa, Akimasa; Baishev, Dmitry

    2015-04-01

    A wavy current sheet event observed on 15th of October 2004 between 1235 and 1300 UT has been studied by using Cluster and ground-based magnetometer data. Waves propagating from the tail centre to the duskside flank with a period ~30 s and wavelength ~1 RE, are superimposed on a flapping current sheet, accompanied with a bursty bulk flow (BBF). Three Pi2 pulsations, with onset at ~1236, ~1251 and ~1255 UT, respectively, are observed at the Tixie (TIK) station located near the foot-points of Cluster. The mechanism creating the Pi2 (period ~40 s) onset at ~1236 UT is unclear. The second Pi2 (period ~90 s, onset at ~1251 UT) is associated with a strong field-aligned current, which has a strong transverse component of the magnetic field, observed by Cluster with a time delay ~60 s. We suggest that it is caused by bouncing Alfvén waves between the northern and southern ionosphere which transport the field-aligned current. For the third Pi2 (period ~60 s) there is almost no damping at the first three periods. They occur in conjunction with periodic field-aligned currents one-on-one with 72s delay. We suggest that it is generated by these periodic field-aligned currents. We conclude that the strong field-aligned currents generated in the plasma sheet during flapping with superimposed higher frequency waves can drive Pi2 pulsations on the ground, and periodic field-aligned currents can even control the period of the Pi2s.

  9. Quality assurance program plan for the Reactor Research Experiment Programs (RREP)

    International Nuclear Information System (INIS)

    Pipher, D.G.

    1982-05-01

    This document describes the Quality Assurance Program plans which will be applied to tasks on Reactor Research Experiments performed on Sandia National Laboratories' reactors. The program provides for individual project or experiment quality plan development and allows for reasonable plan flexibility and maximum plan visibility. Various controls and requirements in this program plan are considered mandatory on all features which are identified as important to public health and safety (Level I). It is the intent of this document that the Quality Assurance program comprise those elements which will provide adequate assurance that all components, equipment, and systems of the experiments will perform as designed, and hence prevent delays and costs due to rejections or failures

  10. Effects of neuromuscular training on the reaction time and electromechanical delay of the peroneus longus muscle.

    Science.gov (United States)

    Linford, Christena W; Hopkins, J Ty; Schulthies, Shane S; Freland, Brent; Draper, David O; Hunter, Iain

    2006-03-01

    To examine the influence of a 6-week neuromuscular training program on the electromechanical delay and reaction time of the peroneus longus muscle. A 2 x 2 pre-post factorial design. Human performance research center biomechanics laboratory. Thirty-six healthy, physically active, college-age subjects were recruited for this study and 26 completed it. There were 5 men and 8 women in the treatment group (mean age +/- standard deviation, 21.9+/-2.1 y; height, 173.7+/-11.1cm; weight, 67.4+/-17.8 kg) and 6 men and 7 women in the control group (age, 21.8+/-2.3 y; height, 173.7+/-11.9 cm; weight, 70.8+/-19.4 kg). Subjects were not currently experiencing any lower-extremity pathology and had no history of injuries requiring treatment to either lower extremity. Subjects in the treatment group completed a 6-week neuromuscular training program involving various therapeutic exercises. Subjects in the control group were asked to continue their normal physical activity during the 6-week period. The electromechanical delay of the peroneus longus was determined by the onset of force contribution after artificial activation, as measured by electromyographic and forceplate data. Reaction time was measured after a perturbation during walking. Data were analyzed using two 2 x 2 analyses of covariance (covariate pretest score). Group (treatment, control) and sex (male, female) were between-subject factors. Neuromuscular training caused a decrease in reaction time to perturbation during walking compared with controls (F=4.030, P=.029), while there was a trend toward an increase in electromechanical delay (F=4.227, P=.052). There was no significant difference between sexes or the interaction of sex and treatment in either reaction time or electromechanical delay. The 6-week training program significantly reduced reaction time of the peroneus longus muscle in healthy subjects. Neuromuscular training may have a beneficial effect on improving dynamic restraint during activity.

  11. Writing analytic element programs in Python.

    Science.gov (United States)

    Bakker, Mark; Kelson, Victor A

    2009-01-01

    The analytic element method is a mesh-free approach for modeling ground water flow at both the local and the regional scale. With the advent of the Python object-oriented programming language, it has become relatively easy to write analytic element programs. In this article, an introduction is given of the basic principles of the analytic element method and of the Python programming language. A simple, yet flexible, object-oriented design is presented for analytic element codes using multiple inheritance. New types of analytic elements may be added without the need for any changes in the existing part of the code. The presented code may be used to model flow to wells (with either a specified discharge or drawdown) and streams (with a specified head). The code may be extended by any hydrogeologist with a healthy appetite for writing computer code to solve more complicated ground water flow problems. Copyright © 2009 The Author(s). Journal Compilation © 2009 National Ground Water Association.

  12. Ground System Extensibility Considerations

    Science.gov (United States)

    Miller, S. W.; Greene, E.

    2017-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will replace the afternoon orbit component and ground processing system of the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA. The JPSS satellites will carry a suite of sensors designed to collect meteorological, oceanographic, climatological and geophysical observations of the Earth. The ground processing system for JPSS is known as the JPSS Common Ground System (JPSS CGS). Developed and maintained by Raytheon Intelligence, Information and Services (IIS), the CGS is a multi-mission enterprise system serving NOAA, NASA and their national and international partners, such as NASA's Earth Observation System (EOS), NOAA's current POES, the Japan Aerospace Exploration Agency's (JAXA) Global Change Observation Mission - Water (GCOM-W1), and DoD's Defense Meteorological Satellite Program (DMSP). The CGS provides a wide range of support to a number of national and international missions, including command and control, mission management, data acquisition and routing, and environmental data processing and distribution. The current suite of CGS-supported missions has demonstrated the value of interagency and international partnerships to address global observation needs. With its established infrastructure and existing suite of missions, the CGS is extensible to a wider array of potential new missions. This paper will describe how the inherent scalability and extensibility of the CGS enables the addition of these new missions, with an eye on global enterprise needs in the 2020's and beyond.

  13. Chaos control in delayed chaotic systems via sliding mode based delayed feedback

    Energy Technology Data Exchange (ETDEWEB)

    Vasegh, Nastaran [Faculty of Electrical Engineering, K.N. Toosi University of Technology, Seyed Khandan Bridge, Shariati St. 16314, P.O. Box 16315-1355, Tehran (Iran, Islamic Republic of)], E-mail: vasegh@eetd.kntu.ac.ir; Sedigh, Ali Khaki [Faculty of Electrical Engineering, K.N. Toosi University of Technology, Seyed Khandan Bridge, Shariati St. 16314, P.O. Box 16315-1355, Tehran (Iran, Islamic Republic of)

    2009-04-15

    This paper investigates chaos control for scalar delayed chaotic systems using sliding mode control strategy. Sliding surface design is based on delayed feedback controller. It is shown that the proposed controller can achieve stability for an arbitrary unstable fixed point (UPF) or unstable periodic orbit (UPO) with arbitrary period. The chaotic system used in this study to illustrate the theoretical concepts is the well known Mackey-Glass model. Simulation results show the effectiveness of the designed nonlinear sliding mode controller.

  14. Chaos control in delayed chaotic systems via sliding mode based delayed feedback

    International Nuclear Information System (INIS)

    Vasegh, Nastaran; Sedigh, Ali Khaki

    2009-01-01

    This paper investigates chaos control for scalar delayed chaotic systems using sliding mode control strategy. Sliding surface design is based on delayed feedback controller. It is shown that the proposed controller can achieve stability for an arbitrary unstable fixed point (UPF) or unstable periodic orbit (UPO) with arbitrary period. The chaotic system used in this study to illustrate the theoretical concepts is the well known Mackey-Glass model. Simulation results show the effectiveness of the designed nonlinear sliding mode controller.

  15. Identification of technical guidance related to ground water monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Vogelsberger, R.R.; Smith, E.D.; Broz, M.; Wright, J.C. Jr.

    1987-05-01

    Monitoring of ground water quality is a key element of ground water protection and is mandated by several federal and state laws concerned with water quality or waste management. Numerous regulatory guidance documents and technical reports discuss various aspects of ground water monitoring, but at present there is no single source of guidance on procedures and practices for ground water monitoring. This report is intended to assist US Department of Energy (DOE) officials and facility operating personnel in identifying sources of guidance for developing and implementing ground water monitoring programs that are technically sound and that comply with applicable regulations. Federal statutes and associated regulations were reviewed to identify requirements related to ground water monitoring, and over 160 documents on topics related to ground water monitoring were evaluated for their technical merit, their utility as guidance for regulatory compliance, and their relevance to DOE's needs. For each of 15 technical topics involved in ground water monitoring, the report presents (1) a review of federal regulatory requirements and representative state requirements, (2) brief descriptions of the contents and merits of available guidance documents and technical references, and (3) recommendations of the guidance documents or other technical resources that appear to be most appropriate for use in DOE's monitoring activities. The contents of the report are applicable to monitoring activities involving both radioactive and nonradioactive substances. The main sources of regulatory requirements considered in the report are the Atomic Energy Act (including the Uranium Mill Tailings Radiation Control Act), Resource Conservation and Recovery Act, Comprehensive Environmental Response, Compensation and Liability Act, Safe Drinking Water Act, Toxic Substances Control Act, and Federal Water Pollution Control Act.

  16. Identification of technical guidance related to ground water monitoring

    International Nuclear Information System (INIS)

    Vogelsberger, R.R.; Smith, E.D.; Broz, M.; Wright, J.C. Jr.

    1987-05-01

    Monitoring of ground water quality is a key element of ground water protection and is mandated by several federal and state laws concerned with water quality or waste management. Numerous regulatory guidance documents and technical reports discuss various aspects of ground water monitoring, but at present there is no single source of guidance on procedures and practices for ground water monitoring. This report is intended to assist US Department of Energy (DOE) officials and facility operating personnel in identifying sources of guidance for developing and implementing ground water monitoring programs that are technically sound and that comply with applicable regulations. Federal statutes and associated regulations were reviewed to identify requirements related to ground water monitoring, and over 160 documents on topics related to ground water monitoring were evaluated for their technical merit, their utility as guidance for regulatory compliance, and their relevance to DOE's needs. For each of 15 technical topics involved in ground water monitoring, the report presents (1) a review of federal regulatory requirements and representative state requirements, (2) brief descriptions of the contents and merits of available guidance documents and technical references, and (3) recommendations of the guidance documents or other technical resources that appear to be most appropriate for use in DOE's monitoring activities. The contents of the report are applicable to monitoring activities involving both radioactive and nonradioactive substances. The main sources of regulatory requirements considered in the report are the Atomic Energy Act (including the Uranium Mill Tailings Radiation Control Act), Resource Conservation and Recovery Act, Comprehensive Environmental Response, Compensation and Liability Act, Safe Drinking Water Act, Toxic Substances Control Act, and Federal Water Pollution Control Act

  17. Global exponential stability of octonion-valued neural networks with leakage delay and mixed delays.

    Science.gov (United States)

    Popa, Călin-Adrian

    2018-06-08

    This paper discusses octonion-valued neural networks (OVNNs) with leakage delay, time-varying delays, and distributed delays, for which the states, weights, and activation functions belong to the normed division algebra of octonions. The octonion algebra is a nonassociative and noncommutative generalization of the complex and quaternion algebras, but does not belong to the category of Clifford algebras, which are associative. In order to avoid the nonassociativity of the octonion algebra and also the noncommutativity of the quaternion algebra, the Cayley-Dickson construction is used to decompose the OVNNs into 4 complex-valued systems. By using appropriate Lyapunov-Krasovskii functionals, with double and triple integral terms, the free weighting matrix method, and simple and double integral Jensen inequalities, delay-dependent criteria are established for the exponential stability of the considered OVNNs. The criteria are given in terms of complex-valued linear matrix inequalities, for two types of Lipschitz conditions which are assumed to be satisfied by the octonion-valued activation functions. Finally, two numerical examples illustrate the feasibility, effectiveness, and correctness of the theoretical results. Copyright © 2018 Elsevier Ltd. All rights reserved.

  18. Data Assimilation by delay-coordinate nudging

    Science.gov (United States)

    Pazo, Diego; Lopez, Juan Manuel; Carrassi, Alberto

    2016-04-01

    A new nudging method for data assimilation, delay-coordinate nudging, is presented. Delay-coordinate nudging makes explicit use of present and past observations in the formulation of the forcing driving the model evolution at each time-step. Numerical experiments with a low order chaotic system show that the new method systematically outperforms standard nudging in different model and observational scenarios, also when using an un-optimized formulation of the delay-nudging coefficients. A connection between the optimal delay and the dominant Lyapunov exponent of the dynamics is found based on heuristic arguments and is confirmed by the numerical results, providing a guideline for the practical implementation of the algorithm. Delay-coordinate nudging preserves the easiness of implementation, the intuitive functioning and the reduced computational cost of the standard nudging, making it a potential alternative especially in the field of seasonal-to-decadal predictions with large Earth system models that limit the use of more sophisticated data assimilation procedures.

  19. Effect of caffeine on radiation-induced mitotic delay: delayed expression of G2 arrest

    International Nuclear Information System (INIS)

    Rowley, R.; Zorch, M.; Leeper, D.B.

    1984-01-01

    In the presence of 5 mM caffeine, irradiated (1.5 Gy) S and G 2 cells progressed to mitosis in register and without arrest in G 2 . Caffeine (5 mM) markedly reduced mitotic delay even after radiation doses up to 20 Gy. When caffeine was removed from irradiated (1.5 Gy) and caffeine-treated cells, a period of G 2 arrest followed, similar in length to that produced by radiation alone. The arrest expressed was independent of the duration of the caffeine treatment for exposures up to 3 hr. The similarity of the response to the cited effects of caffeine on S-phase delay suggests a common basis for delay induction in S and G 2 phases

  20. Facilitating tolerance of delayed reinforcement during functional communication training.

    Science.gov (United States)

    Fisher, W W; Thompson, R H; Hagopian, L P; Bowman, L G; Krug, A

    2000-01-01

    Few clinical investigations have addressed the problem of delayed reinforcement. In this investigation, three individuals whose destructive behavior was maintained by positive reinforcement were treated using functional communication training (FCT) with extinction (EXT). Next, procedures used in the basic literature on delayed reinforcement and self-control (reinforcer delay fading, punishment of impulsive responding, and provision of an alternative activity during reinforcer delay) were used to teach participants to tolerate delayed reinforcement. With the first case, reinforcer delay fading alone was effective at maintaining low rates of destructive behavior while introducing delayed reinforcement. In the second case, the addition of a punishment component reduced destructive behavior to near-zero levels and facilitated reinforcer delay fading. With the third case, reinforcer delay fading was associated with increases in masturbation and head rolling, but prompting and praising the individual for completing work during the delay interval reduced all problem behaviors and facilitated reinforcer delay fading.

  1. Additional beta-delayed protons from the T/sub z/ = -3/2 nuclei 21Mg, 25Si, 29S, and 41Ti

    International Nuclear Information System (INIS)

    Zhou, Z.Y.; Schloemer, E.C.; Cable, M.D.; Ahmed, M.; Reiff, J.E.; Cerny, J.

    1985-01-01

    Beta-delayed proton emission has proven to be a useful tool for understanding nuclei far from stability. Most of the beta decay strength is concentrated at and below the isobaric analog state (IAS) of the parent nucleus (precursor) ground state. Identification of beta strength to states above the IAS is important not only because it provides additional tests of nuclear models of beta decay, but also because proton emission from such beta daughter nuclei frequently constitutes an important component of the background in searches for more exotic nuclei. Therefore the authors have re-measured the beta-delayed proton spectra of four T/sub z/ = -3/2 nuclei: 21 Mg, 25 Si, 29 S, and 41 Ti. Fourteen previously unreported proton groups were observed and beta decay branching ratios were derived for each

  2. Mathematical Representation of VoIP Connection Delay

    Directory of Open Access Journals (Sweden)

    M. Halas

    2007-09-01

    Full Text Available The main topic of this article is to define mathematical formulation of VoIP connection delay model. It handles about all partial delay components, the mechanism of their generation, facilities and their mathematical formulation. Thereafter based on mathematical formulation of all partial delay components, the final mathematical model of whole VoIP call delay is created. In conclusion of this article the results of the designed mathematical model are compared with the experimentally gained results.

  3. Delays in the management of retroperitoneal sarcomas

    DEFF Research Database (Denmark)

    Seinen, Jojanneke; Almquist, Martin; Styring, Emelie

    2010-01-01

    Retroperitoneal sarcomas are rare and treatment should optimally be centralized. Despite successful centralization with 90% of the patients referred prior to surgery, delays occur, which led us to assess lead times in a population-based series. Method. Patients diagnosed with retroperitoneal...... sarcoma in the southern Sweden health care region 2003-2009 were eligible for the study. Data on referrals and diagnostic investigations were collected from clinical files from primary health care, local hospitals, and from the sarcoma centre. Lead times were divided into patient delays and health care...... delays caused by primary health care, local hospitals, or procedures at the sarcoma centre. Results. Complete data were available from 33 patients and demonstrated a median patient delay of 23¿days (0-17¿months) and median health care delay of 94¿days (1-40¿months) with delays of median 15¿days...

  4. Delay Tolerance: A Therapeutic Possibility for AD/HD?

    Directory of Open Access Journals (Sweden)

    Edmund J. S. Sonuga-Barke

    2004-01-01

    on these two insights to explore the possibility that the motivational alterations underpinning delay aversion can be modified through specific training regimes in a way equivalent to that found with executive and attentional training. The requirements for such an approach are set out. Delay fading is proposed as a possible basis for reorganizing delay experience, altering the incentive value of delay (e.g., increasing tolerance for delay, thereby reducing AD/HD symptoms.

  5. A Delay Line for Compression of Electromagnetic Pulses

    International Nuclear Information System (INIS)

    Pchelnikov, Yuriy N.; Nyce, David S.

    2003-01-01

    A novel method to obtain an electromagnetic signal delay is described. It is shown that the positive magnetic and electric coupling between impedance conductors produces an increase in the time delay. It is also shown that the increase in delay time is obtained without additional attenuation. This allows a reduction in electromagnetic losses, by a factor of several times, for a delay time. An approximate analysis of electromagnetic delay lines based on coupled impedance conductors with 'spiral' and 'meander' patterns allowed obtaining very simple expressions for the wave deceleration factor, wave impedance, and attenuation factor. The results of the analysis are confirmed by the results of measurements. It is shown that a delay line based on counter-wound radial spirals can be successfully used for compression of electromagnetic pulses. Although the offered delay line was designed to operate with a relatively small signal, the analysis of the 'coupling effect', taking place in this delay line, might be useful in devices for compression of high-power microwave pulses

  6. Limited access to special education services for school-aged children with developmental delay.

    Science.gov (United States)

    Twardzik, Erica; Smit, Ellen; Hatfield, Bridget; Odden, Michelle C; Dixon-Ibarra, Alicia; MacDonald, Megan

    2018-01-01

    Current policy in Oregon limits eligibility of children diagnosed with developmental delay for school-based services. Due to eligibility definitions, children with developmental delay may face additional barriers transitioning from early intervention/early childhood special education into school-based special education services. Examine the relationship between enrollment in school-based special education programs given a change in primary disability diagnosis. Logistic regression models were fit for children who enrolled in early intervention/early childhood special education services with a primary disability diagnosis of developmental delay and changed primary disability diagnosis before third grade (n=5076). Odds of enrollment in future special education were greater in children with a change in primary disability diagnosis after the age of five in comparison to children that had a change in primary disability diagnosis before the age of five, while adjusting for demographic characteristics (adjusted odds ratio: 2.37, 95% CI 1.92, 2.92). Results suggest that children who are diagnosed with a developmental delay and exit early childhood special education due to maximum age of eligibility are more likely to enroll in special education compared to children without a gap in service access. Gaps in service access during early development are associated with the need for supportive services later on in life. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. Air and ground temperatures along elevation and continentality gradients in Southern Norway

    Science.gov (United States)

    Farbrot, Herman; Hipp, Tobias; Etzelmüller, Bernd; Humlum, Ole; Isaksen, Ketil; Strand Ødegârd, Rune

    2010-05-01

    The modern southern boundary for Scandinavian permafrost is located in the mountains of Southern Norway. Permafrost and seasonal frost are considered key components of the cryosphere, and the climate-permafrost relation has acquired added importance with the increasing awareness and concern of rising air temperatures. The three-year research project CRYOLINK ("Permafrost and seasonal frost in southern Norway") aims at improving knowledge on past and present ground temperatures, seasonal frost, and distribution of mountain permafrost in Southern Norway by addressing the fundamental problem of heat transfer between the atmosphere and the ground surface. Hence, several shallow boreholes have been drilled, and a monitoring program to measure air and ground temperatures was started August 2008. The borehole areas (Juvvass, Jetta and Tron) are situated along a west-east transect and, hence, a continentality gradient, and each area provides boreholes at different elevations. Here we present the first year of air and ground temperatures from these sites and discuss the influence of air temperature and ground surface charcteristics (snow conditions, sediments/bedrock, vegetation) on ground temperatures.

  8. An approach to normal forms of Kuramoto model with distributed delays and the effect of minimal delay

    Energy Technology Data Exchange (ETDEWEB)

    Niu, Ben, E-mail: niubenhit@163.com [Department of Mathematics, Harbin Institute of Technology, Weihai 264209 (China); Guo, Yuxiao [Department of Mathematics, Harbin Institute of Technology, Weihai 264209 (China); Jiang, Weihua [Department of Mathematics, Harbin Institute of Technology, Harbin 150001 (China)

    2015-09-25

    Heterogeneous delays with positive lower bound (gap) are taken into consideration in Kuramoto model. On the Ott–Antonsen's manifold, the dynamical transitional behavior from incoherence to coherence is mediated by Hopf bifurcation. We establish a perturbation technique on complex domain, by which universal normal forms, stability and criticality of the Hopf bifurcation are obtained. Theoretically, a hysteresis loop is found near the subcritically bifurcated coherent state. With respect to Gamma distributed delay with fixed mean and variance, we find that the large gap decreases Hopf bifurcation value, induces supercritical bifurcations, avoids the hysteresis loop and significantly increases in the number of coexisting coherent states. The effect of gap is finally interpreted from the viewpoint of excess kurtosis of Gamma distribution. - Highlights: • Heterogeneously delay-coupled Kuramoto model with minimal delay is considered. • Perturbation technique on complex domain is established for bifurcation analysis. • Hysteresis phenomenon is investigated in a theoretical way. • The effect of excess kurtosis of distributed delays is discussed.

  9. Ground Processing Affordability for Space Vehicles

    Science.gov (United States)

    Ingalls, John; Scott, Russell

    2011-01-01

    Launch vehicles and most of their payloads spend the majority of their time on the ground. The cost of ground operations is very high. So, why so often is so little attention given to ground processing during development? The current global space industry and economic environment are driving more need for efficiencies to save time and money. Affordability and sustainability are more important now than ever. We can not continue to treat space vehicles as mere science projects. More RLV's (Reusable Launch Vehicles) are being developed for the gains of reusability which are not available for ELV's (Expendable Launch Vehicles). More human-rated vehicles are being developed, with the retirement of the Space Shuttles, and for a new global space race, yet these cost more than the many unmanned vehicles of today. We can learn many lessons on affordability from RLV's. DFO (Design for Operations) considers ground operations during design, development, and manufacturing-before the first flight. This is often minimized for space vehicles, but is very important. Vehicles are designed for launch and mission operations. You will not be able to do it again if it is too slow or costly to get there. Many times, technology changes faster than space products such that what is launched includes outdated features, thus reducing competitiveness. Ground operations must be considered for the full product Lifecycle, from concept to retirement. Once manufactured, launch vehicles along with their payloads and launch systems require a long path of processing before launch. Initial assembly and testing always discover problems to address. A solid integration program is essential to minimize these impacts, as was seen in the Constellation Ares I-X test rocket. For RLV's, landing/recovery and post-flight turnaround activities are performed. Multi-use vehicles require reconfiguration. MRO (Maintenance, Repair, and Overhaul) must be well-planned--- even for the unplanned problems. Defect limits and

  10. Ground-water surveillance at the Hanford Site for CY 1982

    International Nuclear Information System (INIS)

    Eddy, P.A.; Prater, L.S.; Rieger, J.T.

    1983-06-01

    Operations at the Hanford Site since 1944 have resulted in the discharge of large volumes of process cooling water and other waste waters to the ground. These effluents, which have reached the unconfined ground water, contain low levels of radioactive and chemical substances. The movement of these constituents in the unconfined ground water is monitored as part of the Ground-Water Surveillance Program. During 1982, 324 monitoring wells were sampled at various times for radioactive and chemical constituents. Tritium are the primary ones used to monitor the movement of the ground water. This report describes recent changes in the configuration of the tritium and nitrate plumes. The tritium plume continues to show increasing concentrations near the Columbia River. While it is mapped as having reached the Columbia River, its contribution to the river has not been distinguished from other sources at this time. The general plume configuration is much the same as in 1978, 1979, 1980, and 1981. The size of the nitrate plume appears stable. Concentrations of nitrate in the vicinity of the 100-H Area continue to be high as a result of past leaks from an evaporation facility

  11. Basin scale management of surface and ground water

    International Nuclear Information System (INIS)

    Tracy, J.C.; Al-Sharif, M.

    1993-01-01

    An important element in the economic development of many regions of the Great Plains is the availability of a reliable water supply. Due to the highly variable nature of the climate through out much of the Great Plains region, non-controlled stream flow rates tend to be highly variable from year to year. Thus, the primary water supply has tended towards developing ground water aquifers. However, in regions where shallow ground water is extracted for use, there exists the potential for over drafting aquifers to the point of depleting hydraulically connected stream flows, which could adversely affect the water supply of downstream users. To prevent the potential conflict that can arise when a basin's water supply is being developed or to control the water extractions within a developed basin requires the ability to predict the effect that water extractions in one region will have on water extractions from either surface or ground water supplies else where in the basin. This requires the ability to simulate ground water levels and stream flows on a basin scale as affected by changes in water use, land use practices and climatic changes within the basin. The outline for such a basin scale surface water-ground water model has been presented in Tracy (1991) and Tracy and Koelliker (1992), and the outline for the mathematical programming statement to aid in determining the optimal allocation of water on a basin scale has been presented in Tracy and Al-Sharif (1992). This previous work has been combined into a computer based model with graphical output referred to as the LINOSA model and was developed as a decision support system for basin managers. This paper will present the application of the LINOSA surface-ground water management model to the Rattlesnake watershed basin that resides within Ground Water Management District Number 5 in south central Kansas

  12. Bubbling in delay-coupled lasers.

    Science.gov (United States)

    Flunkert, V; D'Huys, O; Danckaert, J; Fischer, I; Schöll, E

    2009-06-01

    We theoretically study chaos synchronization of two lasers which are delay coupled via an active or a passive relay. While the lasers are synchronized, their dynamics is identical to a single laser with delayed feedback for a passive relay and identical to two delay-coupled lasers for an active relay. Depending on the coupling parameters the system exhibits bubbling, i.e., noise-induced desynchronization, or on-off intermittency. We associate the desynchronization dynamics in the coherence collapse and low-frequency fluctuation regimes with the transverse instability of some of the compound cavity's antimodes. Finally, we demonstrate how, by using an active relay, bubbling can be suppressed.

  13. Exogenous Hydrogen Peroxide Contributes to Heme Oxygenase-1 Delaying Programmed Cell Death in Isolated Aleurone Layers of Rice Subjected to Drought Stress in a cGMP-Dependent Manner.

    Science.gov (United States)

    Wang, Guanghui; Xiao, Yu; Deng, Xiaojiang; Zhang, Heting; Li, Tingge; Chen, Huiping

    2018-01-01

    Hydrogen peroxide (H 2 O 2 ) is a reactive oxygen species (ROS) that plays a dual role in plant cells. Here, we discovered that drought (20% polyethylene glycol-6000, PEG)-triggered decreases of HO-1 transcript expression and HO activity. However, exogenous H 2 O 2 contributed toward the increase in HO-1 gene expression and activity of the enzyme under drought stress. Meanwhile, the HO-1 inducer hematin could mimic the effects of the H 2 O 2 scavengers ascorbic acid (AsA) and dimethylthiourea (DMTU) and the H 2 O 2 synthesis inhibitor diphenyleneiodonium (DPI) for scavenging or diminishing drought-induced endogenous H 2 O 2 . Conversely, the zinc protoporphyrin IX (ZnPPIX), an HO-1-specific inhibitor, reversed the effects of hematin. We further analyzed the endogenous H 2 O 2 levels and HO-1 transcript expression levels of aleurone layers treated with AsA, DMTU, and DPI in the presence of exogenous H 2 O 2 under drought stress, respectively. The results showed that in aleurone layers subjected to drought stress, when the endogenous H 2 O 2 level was inhibited, the effect of exogenous H 2 O 2 on the induction of HO-1 was enhanced. Furthermore, exogenous H 2 O 2 -activated HO-1 effectively enhanced amylase activity. Application of 8-bromoguanosine 3',5'-cyclic guanosine monophosphate (8-Br-cGMP) (the membrane permeable cGMP analog) promoted the effect of exogenous H 2 O 2 -delayed PCD of aleurone layers in response to drought stress. More importantly, HO-1 delayed the programmed cell death (PCD) of aleurone layers by cooperating with nitric oxide (NO), and the delayed effect of NO on PCD was achieved via mediation by cGMP under drought stress. In short, in rice aleurone layers, exogenous H 2 O 2 (as a signaling molecule) triggered HO-1 and delayed PCD via cGMP which possibly induced amylase activity under drought stress. In contrast, as a toxic by-product of cellular metabolism, the drought-generated H 2 O 2 promoted cell death.

  14. Delay Management with Re-Routing of Passengers

    NARCIS (Netherlands)

    T.A.B. Dollevoet (Twan); D. Huisman (Dennis); M.E. Schmidt (Marie); A. Schöbel (Anita)

    2010-01-01

    textabstractThe question of delay management is whether trains should wait for a delayed feeder train or should depart on time. In classical delay management models passengers always take their originally planned route. In this paper, we propose a model where re-routing of passengers is

  15. Synchronization analysis of coloured delayed networks under ...

    Indian Academy of Sciences (India)

    This paper investigates synchronization of coloured delayed networks under decentralized pinning intermittent control. To begin with, the time delays are taken into account in the coloured networks. In addition, we propose a decentralized pinning intermittent control for coloured delayed networks, which is different from that ...

  16. Monitoring delays in diagnosis of pulmonary tuberculosis in eight cities in Colombia

    Directory of Open Access Journals (Sweden)

    David A. Rodríguez

    Full Text Available ABSTRACT Objective To measure time between onset of tuberculosis (TB symptoms and start of treatment, and to identify factors associated with delay in eight Colombian cities. Methods Operational research with a retrospective analytical cohort design was conducted in 2014 using routinely collected data about new smear-positive pulmonary TB patients from eight cities in Colombia (Barranquilla, Bogotá, Bucaramanga, Cali, Cúcuta, Medellín, Pereira, and Villavicencio. Date of symptom onset was sourced from TB surveillance databases. Data on all other variables came from National TB Program (NTP registers. Results There were 2 545 new cases of smear-positive pulmonary TB, but a plausible date of symptom onset was available for only 1 456 (57%. Median number of days between symptom onset and treatment start was 51 days (interquartile range: 27–101. A total of 72% of patients had a delay (> 30 days between symptom onset and treatment start, and 28% had a 3+ bacillary load at diagnosis. Based on multiple logistic regression, three factors were significantly associated with delay: being uninsured (odds ratio (OR: 1.30; 95% confidence interval (CI: 1.01–1.68 and having an unknown HIV status (OR: 1.81; CI: 1.04–3.17, which increased risk, and coming from a neighborhood with NTP-employed community health workers, which decreased risk (OR: 0.56; CI: 0.34–0.90. Conclusions Delays still prevent timely TB diagnosis and treatment in Colombia. As the country aims for TB elimination, delays must be reduced, especially in cities and vulnerable neighborhoods, to stop community transmission. The NTP should focus not only on the number of cases detected but also on how long it takes to detect them. To monitor interventions designed to reduce delays, additional dates in the process should be recorded routinely. In addition, reliability and completeness of data are crucial for monitoring.

  17. Time-Delay Effects on Constitutive Gene Expression*

    International Nuclear Information System (INIS)

    Feng Yan-Ling; Wang Dan; Tang Xu-Lei; Dong Jian-Min

    2017-01-01

    The dynamics of constitutive gene expression with delayed mRNA degradation is investigated, where the intrinsic noise caused by the small number of reactant molecules is introduced. It is found that the oscillatory behavior claimed in previous investigations does not appear in the approximation of small time delay, and the steady state distribution still follows the Poisson law. Furthermore, we introduce the extrinsic noise induced by surrounding environment to explore the effects of this noise and time delay on the Fano factor. Based on a delay Langevin equation and the corresponding Fokker–Planck equation, the distribution of mRNA copy-number is achieved analytically. The time delay and extrinsic noise play similar roles in the gene expression system, that is, they are able to result in the deviation of the Fano factor from 1 evidently. The measured Fano factor for constitutive gene expression is slightly larger than 1, which is perhaps attributed to the time-delay effect. (paper)

  18. Too Late to Vaccinate? The Incremental Benefits and Cost-effectiveness of a Delayed Catch-up Program Using the 4-Valent Human Papillomavirus Vaccine in Norway

    Science.gov (United States)

    Burger, Emily A.; Sy, Stephen; Nygård, Mari; Kristiansen, Ivar S.; Kim, Jane J.

    2015-01-01

    Background Human papillomavirus (HPV) vaccines are ideally administered before HPV exposure; therefore, catch-up programs for girls past adolescence have not been readily funded. We evaluated the benefits and cost-effectiveness of a delayed, 1-year female catch-up vaccination program in Norway. Methods We calibrated a dynamic HPV transmission model to Norwegian data and projected the costs and benefits associated with 8 HPV-related conditions while varying the upper vaccination age limit to 20, 22, 24, or 26 years. We explored the impact of vaccine protection in women with prior vaccine-targeted HPV infections, vaccine cost, coverage, and natural- and vaccine-induced immunity. Results The incremental benefits and cost-effectiveness decreased as the upper age limit for catch-up increased. Assuming a vaccine cost of $150/dose, vaccination up to age 20 years remained below Norway's willingness-to-pay threshold (approximately $83 000/quality-adjusted life year gained); extension to age 22 years was cost-effective at a lower cost per dose ($50–$75). At high levels of vaccine protection in women with prior HPV exposure, vaccinating up to age 26 years was cost-effective. Results were stable with lower coverage. Conclusions HPV vaccination catch-up programs, 5 years after routine implementation, may be warranted; however, even at low vaccine cost per dose, the cost-effectiveness of vaccinating beyond age 22 years remains uncertain. PMID:25057044

  19. Delay-Dependent Asymptotic Stability of Cohen-Grossberg Models with Multiple Time-Varying Delays

    Directory of Open Access Journals (Sweden)

    Xiaofeng Liao

    2007-01-01

    Full Text Available Dynamical behavior of a class of Cohen-Grossberg models with multiple time-varying delays is studied in detail. Sufficient delay-dependent criteria to ensure local and global asymptotic stabilities of the equilibrium of this network are derived by constructing suitable Lyapunov functionals. The obtained conditions are shown to be less conservative and restrictive than those reported in the known literature. Some numerical examples are included to demonstrate our results.

  20. Operation performance investigation of ground-coupled heat-pump system for temperate region

    OpenAIRE

    Yi Man; Hongxing Yang; Jinggang Wang; Zhaohong Fang

    2010-01-01

    In order to investigate the operation performance of ground-coupled heat-pump (GCHP) system, an analytical simulation model of GCHP system on short time-step basis and a computer program based on this model to predict system operating parameters are developed in this study. Besides, detailed on-site experiments on GCHP test rig installed in a temperate region of China are carried out. The temperature distributions of borehole as well as ground around borehole at different depths are evaluated...

  1. Remote Sensing and Special Surveys Program annual report, January--December 1993

    International Nuclear Information System (INIS)

    Conder, S.R.; Doll, W.E.; Gabrielsen, C.A.; King, A.D.; Durfee, R.C.; Parr, P.D.

    1994-03-01

    The Remote Sensing and Special Surveys Program has been established to provide environmental characterization data, change data, and trend data to various Environmental Restoration and Waste Management (ERWM) programs. The data are acquired through several different types of survey platforms. During the calendar year of 1993, a variety of surveys were conducted through the Remote Sensing and Special Surveys Program. The aerial surveys included geophysical, radiological, false color infrared (IR) photography, and natural color photography. Ground surveys were conducted to correlate data collected from the airborne platforms to data measured at ground level. Ground surveys were also conducted to determine the existence or absence of threatened and endangered plant species on the Oak Ridge Reservation. Some of the special surveys included laser induced fluorescence imaging, solar reflectance, and various remote sensing and ground control activities for the Strategic Environmental Research and Development Program (SERDP) initiative. Data analysis, management, and storage are also conducted by the Remote Sensing and Special Surveys Program to achieve the highest level of data useability possible. The data acquired through these surveys have provided and will continue to provide much needed information to ERWM programs

  2. 14 CFR 1214.805 - Unforeseen customer delay.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Unforeseen customer delay. 1214.805 Section... for Spacelab Services § 1214.805 Unforeseen customer delay. Should an unforeseen customer payload..., if requested by the customer, make all reasonable efforts to prevent a delay, contingent on the...

  3. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  4. Magnetic pulse sharpener and delay-line

    International Nuclear Information System (INIS)

    Li Jin; Dai Guangsen; Xia Liansheng

    2002-01-01

    This paper describes a method to achieve short rise time pulse which has been delayed with a delay-line and magnetic pulse sharpener. A delay-line and two shock-lines are designed to carry pulsed signal with a maximum voltage magnitude up to 80 kV. A pulse of High voltage with arise time of 48 ns at a level of 0.1%-0.9% were achieved, and the attenuation in the line is very small

  5. Eye movements in interception with delayed visual feedback.

    Science.gov (United States)

    Cámara, Clara; de la Malla, Cristina; López-Moliner, Joan; Brenner, Eli

    2018-04-19

    The increased reliance on electronic devices such as smartphones in our everyday life exposes us to various delays between our actions and their consequences. Whereas it is known that people can adapt to such delays, the mechanisms underlying such adaptation remain unclear. To better understand these mechanisms, the current study explored the role of eye movements in interception with delayed visual feedback. In two experiments, eye movements were recorded as participants tried to intercept a moving target with their unseen finger while receiving delayed visual feedback about their own movement. In Experiment 1, the target randomly moved in one of two different directions at one of two different velocities. The delay between the participant's finger movement and movement of the cursor that provided feedback about the finger movements was gradually increased. Despite the delay, participants followed the target with their gaze. They were quite successful at hitting the target with the cursor. Thus, they moved their finger to a position that was ahead of where they were looking. Removing the feedback showed that participants had adapted to the delay. In Experiment 2, the target always moved in the same direction and at the same velocity, while the cursor's delay varied across trials. Participants still always directed their gaze at the target. They adjusted their movement to the delay on each trial, often succeeding to intercept the target with the cursor. Since their gaze was always directed at the target, and they could not know the delay until the cursor started moving, participants must have been using peripheral vision of the delayed cursor to guide it to the target. Thus, people deal with delays by directing their gaze at the target and using both experience from previous trials (Experiment 1) and peripheral visual information (Experiment 2) to guide their finger in a way that will make the cursor hit the target.

  6. Mexican immigrant mothers' perceptions of their children's communication disabilities, emergent literacy development, and speech-language therapy program.

    Science.gov (United States)

    Kummerer, Sharon E; Lopez-Reyna, Norma A; Hughes, Marie Tejero

    2007-08-01

    This qualitative study explored mothers' perceptions of their children's communication disabilities, emergent literacy development, and speech-language therapy programs. Participants were 14 Mexican immigrant mothers and their children (age 17-47 months) who were receiving center-based services from an early childhood intervention program, located in a large urban city in the Midwestern United States. Mother interviews composed the primary source of data. A secondary source of data included children's therapy files and log notes. Following the analysis of interviews through the constant comparative method, grounded theory was generated. The majority of mothers perceived their children as exhibiting a communication delay. Causal attributions were diverse and generally medical in nature (i.e., ear infections, seizures) or due to familial factors (i.e., family history and heredity, lack of extended family). Overall, mothers seemed more focused on their children's speech intelligibility and/or expressive language in comparison to emergent literacy abilities. To promote culturally responsive intervention, mothers recommended that professionals speak Spanish, provide information about the therapy process, and use existing techniques with Mexican immigrant families.

  7. Study on hybrid ground-coupled heat pump systems

    Energy Technology Data Exchange (ETDEWEB)

    Yi, Man; Hongxing, Yang [Renewable Energy Research Group, The Hong Kong Polytechnic University, Hong Kong (China); Zhaohong, Fang [School of Thermal Energy Engineering, Shandong Architecture University, Jinan (China)

    2008-07-01

    Although ground-coupled heat pump (GCHP) systems are becoming attractive air-conditioning systems in some regions, the significant drawback for their wider application is the high initial cost. Besides, more energy is rejected into ground by the GCHP system installed in cooling-dominated buildings than the energy extracted from ground on an annual basis and this imbalance can result in the degradation of system performance. One of the available options that can resolve these problems is to apply the hybrid ground-coupled heat pump (HGCHP) systems, with supplemental heat rejecters for rejecting extra thermal energy when they are installed in cooling-dominated buildings. This paper presents a practical hourly simulation model of the HGCHP system by modeling the heat transfer of its main components. The computer program developed on this hourly simulation model can be used to calculate the operating data of the HGCHP system according to the building load. The design methods and running control strategies of the HGCHP system for a sample building are investigated. The simulation results show that proper HGCHP system can effectively reduce both the initial cost and the operating cost of an air-conditioning system compared with the traditional GCHP system used in cooling-dominated buildings. (author)

  8. Delay Discounting Mediates Parent-Adolescent Relationship Quality and Risky Sexual Behavior for Low Self-Control Adolescents

    Science.gov (United States)

    Kahn, Rachel E.; Holmes, Christopher; Farley, Julee P.; Kim-Spoon, Jungmeen

    2015-01-01

    Parent-adolescent relationship quality and delay discounting may play important roles in adolescents’ sexual decision making processes, and levels of self-control during adolescence could act as a buffer within these factors. This longitudinal study included 219 adolescent (55% male; mean age = 12.66 years at Wave 1; mean age = 15.10 years at Wave 2) and primary caregiver dyads. Structural equation modeling was utilized to determine whether delay discounting mediated the association between parent-adolescent relationship quality and adolescents’ risky sexual behavior and how this mediated association may differ between those with high versus low self-control. The results revealed parent-adolescent relationship quality plays a role in the development of risky sexual behavior indirectly through levels of delay discounting, but only for adolescents with low self-control. These findings could inform sex education policies and health prevention programs that address adolescent risky sexual behavior. PMID:26202153

  9. The dynamics of second-order equations with delayed feedback and a large coefficient of delayed control

    Science.gov (United States)

    Kashchenko, Sergey A.

    2016-12-01

    The dynamics of second-order equations with nonlinear delayed feedback and a large coefficient of a delayed equation is investigated using asymptotic methods. Based on special methods of quasi-normal forms, a new construction is elaborated for obtaining the main terms of asymptotic expansions of asymptotic residual solutions. It is shown that the dynamical properties of the above equations are determined mostly by the behavior of the solutions of some special families of parabolic boundary value problems. A comparative analysis of the dynamics of equations with the delayed feedback of three types is carried out.

  10. Time-delayed chameleon: Analysis, synchronization and FPGA implementation

    Science.gov (United States)

    Rajagopal, Karthikeyan; Jafari, Sajad; Laarem, Guessas

    2017-12-01

    In this paper we report a time-delayed chameleon-like chaotic system which can belong to different families of chaotic attractors depending on the choices of parameters. Such a characteristic of self-excited and hidden chaotic flows in a simple 3D system with time delay has not been reported earlier. Dynamic analysis of the proposed time-delayed systems are analysed in time-delay space and parameter space. A novel adaptive modified functional projective lag synchronization algorithm is derived for synchronizing identical time-delayed chameleon systems with uncertain parameters. The proposed time-delayed systems and the synchronization algorithm with controllers and parameter estimates are then implemented in FPGA using hardware-software co-simulation and the results are presented.

  11. Bifurcation analysis of delay-induced periodic oscillations

    NARCIS (Netherlands)

    Green, K.

    2010-01-01

    In this paper we consider a generic differential equation with a cubic nonlinearity and delay. This system, in the absence of delay, is known to undergo an oscillatory instability. The addition of the delay is shown to result in the creation of a number of periodic solutions with constant amplitude

  12. Improved Delayed-Neutron Spectroscopy Using Trapped Ions

    Energy Technology Data Exchange (ETDEWEB)

    Norman, Eric

    2018-04-24

    The neutrons emitted following the  decay of fission fragments (known as delayed neutrons because they are emitted after fission on a timescale of the -decay half-lives) play a crucial role in reactor performance and control. Reviews of delayed-neutron properties highlight the need for high-quality data for a wide variety of delayed-neutron emitters to better understand the timedependence and energy spectrum of the neutrons as these properties are essential for a detailed understanding of reactor kinetics needed for reactor safety and to understand the behavior of these reactors under various accident and component-failure scenarios. For fast breeder reactors, criticality calculations require accurate delayed-neutron energy spectra and approximations that are acceptable for light-water reactors such as assuming the delayed-neutron and fission-neutron energy spectra are identical are not acceptable and improved -delayed neutron data is needed for safety and accident analyses for these reactors. With improved nuclear data, the delayedneutrons flux and energy spectrum could be calculated from the contributions from individual isotopes and therefore could be accurately modeled for any fuel-cycle concept, actinide mix, or irradiation history. High-quality -delayed neutron measurements are also critical to constrain modern nuclear-structure calculations and empirical models that predict the decay properties for nuclei for which no data exists and improve the accuracy and flexibility of the existing empirical descriptions of delayed neutrons from fission such as the six-group representation

  13. Not All Types of Delay Are Equal: Postsecondary Delay in the U.S. and Taking a Gap Year

    Science.gov (United States)

    Hoe, Nina DePena

    2014-01-01

    Postsecondary delay in the U.S. is a topic that has generated interest in the field of higher education in recent decades. Seventeen percent of U.S. students under the age of 24 who began their postsecondary education in 2004 delayed their entrance for some period of time. At the national level, studies have indicated that students who delay are…

  14. Time-Delay System Identification Using Genetic Algorithm

    DEFF Research Database (Denmark)

    Yang, Zhenyu; Seested, Glen Thane

    2013-01-01

    Due to the unknown dead-time coefficient, the time-delay system identification turns to be a non-convex optimization problem. This paper investigates the identification of a simple time-delay system, named First-Order-Plus-Dead-Time (FOPDT), by using the Genetic Algorithm (GA) technique. The qual......Due to the unknown dead-time coefficient, the time-delay system identification turns to be a non-convex optimization problem. This paper investigates the identification of a simple time-delay system, named First-Order-Plus-Dead-Time (FOPDT), by using the Genetic Algorithm (GA) technique...

  15. Neutron stochastic transport theory with delayed neutrons

    International Nuclear Information System (INIS)

    Munoz-Cobo, J.L.; Verdu, G.

    1987-01-01

    From the stochastic transport theory with delayed neutrons, the Boltzmann transport equation with delayed neutrons for the average flux emerges in a natural way without recourse to any approximation. From this theory a general expression is obtained for the Feynman Y-function when delayed neutrons are included. The single mode approximation for the particular case of a subcritical assembly is developed, and it is shown that Y-function reduces to the familiar expression quoted in many books, when delayed neutrons are not considered, and spatial and source effects are not included. (author)

  16. Current status of Joint FAA/NASA Runway Friction Program

    Science.gov (United States)

    Yager, Thomas J.; Vogler, William A.

    1989-01-01

    Tests with specially instrumented NASA B-737 and FAA B-727 aircraft together with several different ground friction measuring devices have been conducted for a variety of runway surface types and wetness conditions. This effort is part of the Joint FAA/NASA Aircraft Ground Vehicle Runway Friction Program aimed at obaining a better understanding of aircraft ground handling performance under adverse weather conditions and defining relationships between aircraft and ground vehicle tire friction measurements. Aircraft braking performance on dry, wet, snow-, and ice-covered runway conditions is discussed together with ground vehicle friction data obtained under similar runway conditions. For the wet, compacted snow- and ice-covered runway conditions, the relationship between ground vehicles and aircraft friction data is identified. The influence of major test parameters on friction measurements such as speed, test tire characteristics, and surface contaminant type are discussed. The test results indicate that use of properly maintained and calibrated ground vehicles for monitoring runway friction conditions should be encouraged particularly under adverse weather conditions. The current status of the runway friction program is summarized and future test plans are identified.

  17. Developmental delay

    Science.gov (United States)

    Nutrition support is essential for the care of the child with developmental delay. After a thorough evaluation, an individualized intervention plan that accounts for the child’s nutrition status, feeding ability, and medical condition may be determined. Nutrition assessments may be performed at leas...

  18. The effectiveness of multimedia visual perceptual training groups for the preschool children with developmental delay.

    Science.gov (United States)

    Chen, Yi-Nan; Lin, Chin-Kai; Wei, Ta-Sen; Liu, Chi-Hsin; Wuang, Yee-Pay

    2013-12-01

    This study compared the effectiveness of three approaches to improving visual perception among preschool children 4-6 years old with developmental delays: multimedia visual perceptual group training, multimedia visual perceptual individual training, and paper visual perceptual group training. A control group received no special training. This study employed a pretest-posttest control group of true experimental design. A total of 64 children 4-6 years old with developmental delays were randomized into four groups: (1) multimedia visual perceptual group training (15 subjects); (2) multimedia visual perceptual individual training group (15 subjects); paper visual perceptual group training (19 subjects); and (4) a control group (15 subjects) with no visual perceptual training. Forty minute training sessions were conducted once a week for 14 weeks. The Test of Visual Perception Skills, third edition, was used to evaluate the effectiveness of the intervention. Paired-samples t-test showed significant differences pre- and post-test among the three groups, but no significant difference was found between the pre-test and post-test scores among the control group. ANOVA results showed significant differences in improvement levels among the four study groups. Scheffe post hoc test results showed significant differences between: group 1 and group 2; group 1 and group 3; group 1 and the control group; and group 2 and the control group. No significant differences were reported between group 2 and group 3, and group 3 and the control group. The results showed all three therapeutic programs produced significant differences between pretest and posttest scores. The training effect on the multimedia visual perceptual group program and the individual program was greater than the developmental effect Both the multimedia visual perceptual group training program and the multimedia visual perceptual individual training program produced significant effects on visual perception. The

  19. Design and development of an automated D.C. ground fault detection and location system for Cirus

    International Nuclear Information System (INIS)

    Marik, S.K.; Ramesh, N.; Jain, J.K.; Srivastava, A.P.

    2002-01-01

    Full text: The original design of Cirus safety system provided for automatic detection of ground fault in class I D.C. power supply system and its annunciation followed by delayed reactor trip. Identification of a faulty section was required to be done manually by switching off various sections one at a time thus requiring a lot of shutdown time to identify the faulty section. Since class I power supply is provided for safety control system, quick detection and location of ground faults in this supply is necessary as these faults have potential to bypass safety interlocks and hence the need for a new system for automatic location of a faulty section. Since such systems are not readily available in the market, in-house efforts were made to design and develop a plant-specific system, which has been installed and commissioned

  20. The effective delayed neutron fraction for bare-metal criticals

    International Nuclear Information System (INIS)

    Pearlstein, S.

    1999-01-01

    Given sufficient material, a large number of actinides could be used to form bare-metal criticals. The effective delayed neutron fraction for a bare critical comprised of a fissile material is comparable with the absolute delayed neutron fraction. The effective delayed neutron fraction for a bare critical composed of a fissionable material is reduced by factors of 2 to 10 when compared with the absolute delayed neutron fraction. When the effective delayed neutron fraction is small, the difference between delayed and prompt criticality is small, and extreme caution must be used in critical assemblies of these materials. This study uses an approximate but realistic model to survey the actinide region to compare effective delayed neutron fractions with absolute delayed neutron fractions

  1. Discrete-time BAM neural networks with variable delays

    Science.gov (United States)

    Liu, Xin-Ge; Tang, Mei-Lan; Martin, Ralph; Liu, Xin-Bi

    2007-07-01

    This Letter deals with the global exponential stability of discrete-time bidirectional associative memory (BAM) neural networks with variable delays. Using a Lyapunov functional, and linear matrix inequality techniques (LMI), we derive a new delay-dependent exponential stability criterion for BAM neural networks with variable delays. As this criterion has no extra constraints on the variable delay functions, it can be applied to quite general BAM neural networks with a broad range of time delay functions. It is also easy to use in practice. An example is provided to illustrate the theoretical development.

  2. Discrete-time BAM neural networks with variable delays

    International Nuclear Information System (INIS)

    Liu Xinge; Tang Meilan; Martin, Ralph; Liu Xinbi

    2007-01-01

    This Letter deals with the global exponential stability of discrete-time bidirectional associative memory (BAM) neural networks with variable delays. Using a Lyapunov functional, and linear matrix inequality techniques (LMI), we derive a new delay-dependent exponential stability criterion for BAM neural networks with variable delays. As this criterion has no extra constraints on the variable delay functions, it can be applied to quite general BAM neural networks with a broad range of time delay functions. It is also easy to use in practice. An example is provided to illustrate the theoretical development

  3. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  4. Simulation of the Regional Ground-Water-Flow System and Ground-Water/Surface-Water Interaction in the Rock River Basin, Wisconsin

    Science.gov (United States)

    Juckem, Paul F.

    2009-01-01

    A regional, two-dimensional, areal ground-water-flow model was developed to simulate the ground-water-flow system and ground-water/surface-water interaction in the Rock River Basin. The model was developed by the U.S. Geological Survey (USGS), in cooperation with the Rock River Coalition. The objectives of the regional model were to improve understanding of the ground-water-flow system and to develop a tool suitable for evaluating the effects of potential regional water-management programs. The computer code GFLOW was used because of the ease with which the model can simulate ground-water/surface-water interactions, provide a framework for simulating regional ground-water-flow systems, and be refined in a stepwise fashion to incorporate new data and simulate ground-water-flow patterns at multiple scales. The ground-water-flow model described in this report simulates the major hydrogeologic features of the modeled area, including bedrock and surficial aquifers, ground-water/surface-water interactions, and ground-water withdrawals from high-capacity wells. The steady-state model treats the ground-water-flow system as a single layer with hydraulic conductivity and base elevation zones that reflect the distribution of lithologic groups above the Precambrian bedrock and a regionally significant confining unit, the Maquoketa Formation. In the eastern part of the Basin where the shale-rich Maquoketa Formation is present, deep ground-water flow in the sandstone aquifer below the Maquoketa Formation was not simulated directly, but flow into this aquifer was incorporated into the GFLOW model from previous work in southeastern Wisconsin. Recharge was constrained primarily by stream base-flow estimates and was applied uniformly within zones guided by regional infiltration estimates for soils. The model includes average ground-water withdrawals from 1997 to 2006 for municipal wells and from 1997 to 2005 for high-capacity irrigation, industrial, and commercial wells. In addition

  5. A Grounded Theory Analysis of Introductory Computer Science Pedagogy

    Directory of Open Access Journals (Sweden)

    Jonathan Wellons

    2011-12-01

    Full Text Available Planning is a critical, early step on the path to successful program writing and a skill that is often lacking in novice programmers. As practitioners we are continually searching for or creating interventions to help our students, particularly those who struggle in the early stages of their computer science education. In this paper we report on our ongoing research of novice programming skills that utilizes the qualitative research method of grounded theory to develop theories and inform the construction of these interventions. We describe how grounded theory, a popular research method in the social sciences since the 1960’s, can lend formality and structure to the common practice of simply asking students what they did and why they did it. Further, we aim to inform the reader not only about our emerging theories on interventions for planning but also how they might collect and analyze their own data in this and other areas that trouble novice programmers. In this way those who lecture and design CS1 interventions can do so from a more informed perspective.

  6. The identification of risk factors associated with patient and healthcare system delays in the treatment of tuberculosis in Tabriz, Iran.

    Science.gov (United States)

    Ebrahimi Kalan, Mohammad; Yekrang Sis, Hassan; Kelkar, Vinaya; Harrison, Scott H; Goins, Gregory D; Asghari Jafarabadi, Mohammad; Han, Jian

    2018-01-24

    Tuberculosis (TB) is a serious health concern, particularly in developing countries. Various delays, such as patient delay (PD) and healthcare system delay (HSD) in the TB process, are exacerbating the disease burden and increasing the rates of transmission and mortality in various global communities. Therefore, the aim of this study is to identify risk factors associated with PD and HSD in TB patients in Tabriz, Iran. A cross-sectional study was conducted on 173 TB patients in Tabriz, Iran from 2012 to 2014. Patients were interviewed with a semi-structured questionnaire. Frequencies and percentages were reported for patient categories of sex, age, and education. The median and interquartile range (IQR) were reported for the time intervals of delays. Univariate and multivariate logistic regressions of delay in respect to socio-demographic and clinical variables were performed. Statistical significance was set at p patients during their initial visit to the health care facilities. The knowledge generated from this study will be helpful for prioritizing and developing strategies for minimizing delays, initiating early treatment to TB patients, and improving TB-related training programs and healthcare systems in Tabriz, Iran.

  7. Delayed Auditory Feedback and Movement

    Science.gov (United States)

    Pfordresher, Peter Q.; Dalla Bella, Simone

    2011-01-01

    It is well known that timing of rhythm production is disrupted by delayed auditory feedback (DAF), and that disruption varies with delay length. We tested the hypothesis that disruption depends on the state of the movement trajectory at the onset of DAF. Participants tapped isochronous rhythms at a rate specified by a metronome while hearing DAF…

  8. Intra-EVA Space-to-Ground Interactions when Conducting Scientific Fieldwork Under Simulated Mars Mission Constraints

    Science.gov (United States)

    Beaton, Kara H.; Chappell, Steven P.; Abercromby, Andrew F. J.; Lim, Darlene S. S.

    2018-01-01

    The Biologic Analog Science Associated with Lava Terrains (BASALT) project is a four-year program dedicated to iteratively designing, implementing, and evaluating concepts of operations (ConOps) and supporting capabilities to enable and enhance scientific exploration for future human Mars missions. The BASALT project has incorporated three field deployments during which real (non-simulated) biological and geochemical field science have been conducted at two high-fidelity Mars analog locations under simulated Mars mission conditions, including communication delays and data transmission limitations. BASALT's primary Science objective has been to extract basaltic samples for the purpose of investigating how microbial communities and habitability correlate with the physical and geochemical characteristics of chemically altered basalt environments. Field sites include the active East Rift Zone on the Big Island of Hawai'i, reminiscent of early Mars when basaltic volcanism and interaction with water were widespread, and the dormant eastern Snake River Plain in Idaho, similar to present-day Mars where basaltic volcanism is rare and most evidence for volcano-driven hydrothermal activity is relict. BASALT's primary Science Operations objective has been to investigate exploration ConOps and capabilities that facilitate scientific return during human-robotic exploration under Mars mission constraints. Each field deployment has consisted of ten extravehicular activities (EVAs) on the volcanic flows in which crews of two extravehicular and two intravehicular crewmembers conducted the field science while communicating across time delay and under bandwidth constraints with an Earth-based Mission Support Center (MSC) comprised of expert scientists and operators. Communication latencies of 5 and 15 min one-way light time and low (0.512 Mb/s uplink, 1.54 Mb/s downlink) and high (5.0 Mb/s uplink, 10.0 Mb/s downlink) bandwidth conditions were evaluated. EVA crewmembers communicated

  9. Traditional behaviour and fidelity to caribou calving grounds by barren-ground caribou

    Directory of Open Access Journals (Sweden)

    Anne Gunn

    1986-06-01

    Full Text Available Evidence for the fidelity of female barren-ground caribou (Rangifer tarandus spp. of each herd to specific calving grounds is convincing. Involvement of learned behaviour in the annual return of those cows to the same calving grounds implies such actions are a form of «traditional» behaviour. Even wide variations in population size have not yet knowingly led to marked changes in size or location of calving grounds or prolonged abandonment of established ones. Rarely is the adoption of new calving grounds reported and emigration to another herd's calving ground or interchange between calving grounds has not yet been unequivocally documented. The calving experience of individual caribou and environmental pressures may modify the cow's use patterns of her calving grounds. The current definition of herds based on traditional calving grounds may require modification, if increasing caribou numbers result in changes in traditions. However, current data do not contradict either the fidelity to traditional calving grounds or the concept of herd identity based on that fidelity.

  10. Simulated earthquake ground motions

    International Nuclear Information System (INIS)

    Vanmarcke, E.H.; Gasparini, D.A.

    1977-01-01

    The paper reviews current methods for generating synthetic earthquake ground motions. Emphasis is on the special requirements demanded of procedures to generate motions for use in nuclear power plant seismic response analysis. Specifically, very close agreement is usually sought between the response spectra of the simulated motions and prescribed, smooth design response spectra. The features and capabilities of the computer program SIMQKE, which has been widely used in power plant seismic work are described. Problems and pitfalls associated with the use of synthetic ground motions in seismic safety assessment are also pointed out. The limitations and paucity of recorded accelerograms together with the widespread use of time-history dynamic analysis for obtaining structural and secondary systems' response have motivated the development of earthquake simulation capabilities. A common model for synthesizing earthquakes is that of superposing sinusoidal components with random phase angles. The input parameters for such a model are, then, the amplitudes and phase angles of the contributing sinusoids as well as the characteristics of the variation of motion intensity with time, especially the duration of the motion. The amplitudes are determined from estimates of the Fourier spectrum or the spectral density function of the ground motion. These amplitudes may be assumed to be varying in time or constant for the duration of the earthquake. In the nuclear industry, the common procedure is to specify a set of smooth response spectra for use in aseismic design. This development and the need for time histories have generated much practical interest in synthesizing earthquakes whose response spectra 'match', or are compatible with a set of specified smooth response spectra

  11. Delayed feedback control of fractional-order chaotic systems

    International Nuclear Information System (INIS)

    Gjurchinovski, A; Urumov, V; Sandev, T

    2010-01-01

    We study the possibility to stabilize unstable steady states and unstable periodic orbits in chaotic fractional-order dynamical systems by the time-delayed feedback method. By performing a linear stability analysis, we establish the parameter ranges for successful stabilization of unstable equilibria in the plane parameterized by the feedback gain and the time delay. An insight into the control mechanism is gained by analyzing the characteristic equation of the controlled system, showing that the control scheme fails to control unstable equilibria having an odd number of positive real eigenvalues. We demonstrate that the method can also stabilize unstable periodic orbits for a suitable choice of the feedback gain, providing that the time delay is chosen to coincide with the period of the target orbit. In addition, it is shown numerically that delayed feedback control with a sinusoidally modulated time delay significantly enlarges the stability region of steady states in comparison to the classical time-delayed feedback scheme with a constant delay.

  12. Ground motion following selection of SRS design basis earthquake and associated deterministic approach

    International Nuclear Information System (INIS)

    1991-03-01

    This report summarizes the results of a deterministic assessment of earthquake ground motions at the Savannah River Site (SRS). The purpose of this study is to assist the Environmental Sciences Section of the Savannah River Laboratory in reevaluating the design basis earthquake (DBE) ground motion at SRS during approaches defined in Appendix A to 10 CFR Part 100. This work is in support of the Seismic Engineering Section's Seismic Qualification Program for reactor restart

  13. Stability of formation control using a consensus protocol under directed communications with two time delays and delay scheduling

    Science.gov (United States)

    Cepeda-Gomez, Rudy; Olgac, Nejat

    2016-01-01

    We consider a linear algorithm to achieve formation control in a group of agents which are driven by second-order dynamics and affected by two rationally independent delays. One of the delays is in the position and the other in the velocity information channels. These delays are taken as constant and uniform throughout the system. The communication topology is assumed to be directed and fixed. The formation is attained by adding a supplementary control term to the stabilising consensus protocol. In preparation for the formation control logic, we first study the stability of the consensus, using the recent cluster treatment of characteristic roots (CTCR) paradigm. This effort results in a unique depiction of the non-conservative stability boundaries in the domain of the delays. However, CTCR requires the knowledge of the potential stability switching loci exhaustively within this domain. The creation of these loci is done in a new surrogate coordinate system, called the 'spectral delay space (SDS)'. The relative stability is also investigated, which has to do with the speed of reaching consensus. This step leads to a paradoxical control design concept, called the 'delay scheduling', which highlights the fact that the group behaviour may be enhanced by increasing the delays. These steps lead to a control strategy to establish a desired group formation that guarantees spacing among the agents. Example case studies are presented to validate the underlying analytical derivations.

  14. Brain Structure Linking Delay Discounting and Academic Performance.

    Science.gov (United States)

    Wang, Song; Kong, Feng; Zhou, Ming; Chen, Taolin; Yang, Xun; Chen, Guangxiang; Gong, Qiyong

    2017-08-01

    As a component of self-discipline, delay discounting refers to the ability to wait longer for preferred rewards and plays a pivotal role in shaping students' academic performance. However, the neural basis of the association between delay discounting and academic performance remains largely unknown. Here, we examined the neuroanatomical substrates underlying delay discounting and academic performance in 214 adolescents via voxel-based morphometry (VBM) by performing structural magnetic resonance imaging (S-MRI). Behaviorally, we confirmed the significant correlation between delay discounting and academic performance. Neurally, whole-brain regression analyses indicated that regional gray matter volume (rGMV) of the left dorsolateral prefrontal cortex (DLPFC) was associated with both delay discounting and academic performance. Furthermore, delay discounting partly accounted for the association between academic performance and brain structure. Differences in the rGMV of the left DLPFC related to academic performance explained over one-third of the impact of delay discounting on academic performance. Overall, these results provide the first evidence for the common neural basis linking delay discounting and academic performance. Hum Brain Mapp 38:3917-3926, 2017. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  15. Transcriptional delay stabilizes bistable gene networks.

    Science.gov (United States)

    Gupta, Chinmaya; López, José Manuel; Ott, William; Josić, Krešimir; Bennett, Matthew R

    2013-08-02

    Transcriptional delay can significantly impact the dynamics of gene networks. Here we examine how such delay affects bistable systems. We investigate several stochastic models of bistable gene networks and find that increasing delay dramatically increases the mean residence times near stable states. To explain this, we introduce a non-Markovian, analytically tractable reduced model. The model shows that stabilization is the consequence of an increased number of failed transitions between stable states. Each of the bistable systems that we simulate behaves in this manner.

  16. Improved Criteria on Delay-Dependent Stability for Discrete-Time Neural Networks with Interval Time-Varying Delays

    Directory of Open Access Journals (Sweden)

    O. M. Kwon

    2012-01-01

    Full Text Available The purpose of this paper is to investigate the delay-dependent stability analysis for discrete-time neural networks with interval time-varying delays. Based on Lyapunov method, improved delay-dependent criteria for the stability of the networks are derived in terms of linear matrix inequalities (LMIs by constructing a suitable Lyapunov-Krasovskii functional and utilizing reciprocally convex approach. Also, a new activation condition which has not been considered in the literature is proposed and utilized for derivation of stability criteria. Two numerical examples are given to illustrate the effectiveness of the proposed method.

  17. Implementation of the Next Generation Attenuation (NGA) ground-motion prediction equations in Fortran and R

    Science.gov (United States)

    Kaklamanos, James; Boore, David M.; Thompson, Eric M.; Campbell, Kenneth W.

    2010-01-01

    This report presents two methods for implementing the earthquake ground-motion prediction equations released in 2008 as part of the Next Generation Attenuation of Ground Motions (NGA-West, or NGA) project coordinated by the Pacific Earthquake Engineering Research Center (PEER). These models were developed for predicting ground-motion parameters for shallow crustal earthquakes in active tectonic regions (such as California). Of the five ground-motion prediction equations (GMPEs) developed during the NGA project, four models are implemented: the GMPEs of Abrahamson and Silva (2008), Boore and Atkinson (2008), Campbell and Bozorgnia (2008), and Chiou and Youngs (2008a); these models are abbreviated as AS08, BA08, CB08, and CY08, respectively. Since site response is widely recognized as an important influence of ground motions, engineering applications typically require that such effects be modeled. The model of Idriss (2008) is not implemented in our programs because it does not explicitly include site response, whereas the other four models include site response and use the same variable to describe the site condition (VS30). We do not intend to discourage the use of the Idriss (2008) model, but we have chosen to implement the other four NGA models in our programs for those users who require ground-motion estimates for various site conditions. We have implemented the NGA models by using two separate programming languages: Fortran and R (R Development Core Team, 2010). Fortran, a compiled programming language, has been used in the scientific community for decades. R is an object-oriented language and environment for statistical computing that is gaining popularity in the statistical and scientific community. Derived from the S language and environment developed at Bell Laboratories, R is an open-source language that is freely available at http://www.r-project.org/ (last accessed 11 January 2011). In R, the functions for computing the NGA equations can be loaded as an

  18. Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

    Science.gov (United States)

    Lemke, Paul R.; Tuma, Margaret L.; Askins, Bruce R.

    2008-01-01

    For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

  19. Dynamics of microbubble oscillators with delay coupling

    Science.gov (United States)

    Heckman, C. R.; Sah, S. M.; Rand, R. H.

    2010-10-01

    We investigate the stability of the in-phase mode in a system of two delay-coupled bubble oscillators. The bubble oscillator model is based on a 1956 paper by Keller and Kolodner. Delay coupling is due to the time it takes for a signal to travel from one bubble to another through the liquid medium that surrounds them. Using techniques from the theory of differential-delay equations as well as perturbation theory, we show that the equilibrium of the in-phase mode can be made unstable if the delay is long enough and if the coupling strength is large enough, resulting in a Hopf bifurcation. We then employ Lindstedt's method to compute the amplitude of the limit cycle as a function of the time delay. This work is motivated by medical applications involving noninvasive localized drug delivery via microbubbles.

  20. Exploring delay causes of road construction projects in

    Directory of Open Access Journals (Sweden)

    Remon F. Aziz

    2016-06-01

    Full Text Available Construction delays are a common phenomenon in civil engineering projects in Egypt including road construction projects. Therefore, it is essential to study and analyze causes of road construction delays. This paper studied a list of construction delay causes gathered from literature having different types of construction, different countries, different periods and different numbers of delay causes and delay groups. A questionnaire and personal interviews have formed the basis of this paper listing 293 delay causes. The questionnaire survey was distributed to 500 construction participants and 389 were received who represent consultants, contractors and site/design engineers excluding the owner representing the government in road projects as one party only. Relative Importance Index (RII is calculated and according to the highest values the top twenty and the least twenty delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the paper. The test results reveal good correlation of causes and groups between contractors and site/design engineers and between consultants and site design engineers and a somewhat low correlation between contractors and consultants. So there are no root causes that can be taking for granted to be most or least effective delay causes. Proposed model for predicting actual road construction project duration was developed; a real case study tested the accuracy of proposed model. According to the analysis of case study, the most contributing causes and groups to delays were discussed, and some future recommendations were proposed in order to control and minimize delays in road construction projects. These findings can be helpful for project managers to mitigate the road construction delays in Egypt. In order to effectively overcome the road construction delays in developing countries, suggestions are made for fundamental and large