WorldWideScience

Sample records for greg kesden bruce

  1. The Bruce Energy Centre

    International Nuclear Information System (INIS)

    Jones, R.I.

    1982-06-01

    The Bruce Energy Centre Development Corporation is a joint venture of the Ontario Energy Corporation and 6 private companies formed to market surplus steam from the Bruce Nuclear Power Development. The corporation will also sell or lease land near Bruce NPD. The Bruce Energy Centre has an energy output of 900 BTU per day per dollar invested. Potential customers include greenhouse operators, aquaculturalists, food and beverage manufacturers, and traditional manufacturers

  2. RCM: the Bruce B experience

    International Nuclear Information System (INIS)

    Hill, Earl S.; Doyle, E.K.

    1995-01-01

    The use of RCM techniques have begun to change maintenance practice at Bruce B. This paper identifies the status of the program at Bruce B, and examines a new methodology for completing system analysis studies by incorporating lessons learned and results from Bruce A. (author)

  3. Greg Tang: Making Math Count

    Science.gov (United States)

    Pierpont, Katherine

    2006-01-01

    Greg Tang has a resume that could get his foot in the door to a lot of places. A graduate of Harvard with both a B.A. and M.A. in economics, Tang has found success as a business executive, a speechwriter, a software designer and owner of a Tae Kwon Do school. After the publication of his first best-selling book for children, "The Grapes of Math"…

  4. Carsten Niebuhr and James Bruce

    DEFF Research Database (Denmark)

    Friis, Ib

    2013-01-01

    In 1791 Carsten Niebuhr published a review of the first two volumes of Bruce’s Reisen zur Entdeckung der Quellen des Nils (1790). Niebuhr’s strongest criticism of Bruce was that he seemed to have plagiarized some of Niebuhr’s astronomical observations (“adopted them without examination”) and that......In 1791 Carsten Niebuhr published a review of the first two volumes of Bruce’s Reisen zur Entdeckung der Quellen des Nils (1790). Niebuhr’s strongest criticism of Bruce was that he seemed to have plagiarized some of Niebuhr’s astronomical observations (“adopted them without examination...... as written by Bruce in 1770 at Gondar, Abyssinia, contains information about latitudes identical with some of Niebuhr’s observations which were unpublished in 1770; possible explanations for this are proposed. In summary, it seems that Niebuhr is right; it is almost certain that Bruce plagiarized some...

  5. The Bruce nuclear project

    International Nuclear Information System (INIS)

    Rose, J.B.

    1981-01-01

    This case study assesses the industrial relations impact of the construction of the Bruce Nuclear Power Development. It examines the labour relations system in the Ontario electric power sector and in major building construction. Industrial relations problems and practices at the Bruce project are reviewed. The focus of the study is on the relationship between the project and the rest of the Ontario industrial construction industry

  6. Innovations in RCM at Bruce B

    International Nuclear Information System (INIS)

    Hill, E.S.; Doyle, E.K.

    1996-01-01

    The use of RCM techniques have begun to change maintenance practice at Bruce B. This paper discusses innovative practices begun recently. Bruce B has decided to evaluate plant systems using different methods based on the effects of system failure. This approach reduces costs, by using a streamlined method, while maintaining the accuracy of analysis. In addition, the approach increases the likelihood that program recommendations will be implemented by the maintenance department by providing maintenance craft with input to the process. Bruce B has also developed techniques to accelerate the analysis process by evaluating analyses performed at other units. These innovations have been successful piloted at the station

  7. Bruce Power - the first 24 exciting months

    International Nuclear Information System (INIS)

    Mottram, R.

    2003-01-01

    In this presentation, Ron Mottram will review the 2 year business evolution since the inception of Bruce Power - Ontario's largest independent electricity generator. Mr. Mottram will provide an overview of the Bruce Power business and operating history, along with specific emphasis on the project to Restart Bruce Units 3 and 4. Ron will share many of the project successes and challenges, and will provide insight into the myriad of issues faced by a large multi-faceted project of this type. (author)

  8. Bruce A refurbishment - an update

    International Nuclear Information System (INIS)

    Liddle, R.

    2007-01-01

    Running slightly ahead of schedule on the critical path work, the Bruce A Restart Project has not been without its challenges. About a dozen major contractors with a workforce of 1,700 tradespeople share space inside the Units 1 and 2 Construction Island. They share support services, provided by project management contractor AMEC NCL, and they share the consequences when one part of the project advances ahead of schedule or another falls behind. They also share Bruce Power's safety values and are well on their way to surpassing five-million hours without an acute lost time injury. (author)

  9. GRA model development at Bruce Power

    International Nuclear Information System (INIS)

    Parmar, R.; Ngo, K.; Cruchley, I.

    2011-01-01

    In 2007, Bruce Power undertook a project, in partnership with AMEC NSS Limited, to develop a Generation Risk Assessment (GRA) model for its Bruce B Nuclear Generating Station. The model is intended to be used as a decision-making tool in support of plant operations. Bruce Power has recognized the strategic importance of GRA in the plant decision-making process and is currently implementing a pilot GRA application. The objective of this paper is to present the scope of the GRA model development project, methodology employed, and the results and path forward for the model implementation at Bruce Power. The required work was split into three phases. Phase 1 involved development of GRA models for the twelve systems most important to electricity production. Ten systems were added to the model during each of the next two phases. The GRA model development process consists of developing system Failure Modes and Effects Analyses (FMEA) to identify the components critical to the plant reliability and determine their impact on electricity production. The FMEAs were then used to develop the logic for system fault tree (FT) GRA models. The models were solved and post-processed to provide model outputs to the plant staff in a user-friendly format. The outputs consisted of the ranking of components based on their production impact expressed in terms of lost megawatt hours (LMWH). Another key model output was the estimation of the predicted Forced Loss Rate (FLR). (author)

  10. Implementation of a radiological emergency monitoring system for Bruce Power nuclear power plant (Canada); Implementierung eines radiologischen Umgebungsueberwachungsmesssystems fuer das Kernkraftwerk Bruce Power (Kanada)

    Energy Technology Data Exchange (ETDEWEB)

    Madaric, M. [Saphymo GmbH, Frankfurt (Germany)

    2016-07-01

    The Bruce Power nuclear power plant (BP NPP) in Ontario, Canada, is the largest nuclear generating station in the world, operating 8 nuclear reactors producing 6300 MW. In correlation with Bruce Power's safety culture, ''Safety first'' and continuous improvements are essential and substantial parts of the Bruce Power philosophy and management system. After the Fukushima nuclear accident the existing radiological emergency monitoring was analyzed and improved.

  11. Bruce nuclear power development (BNPD) postoperational aquatic studies

    International Nuclear Information System (INIS)

    Carey, W.E.

    1984-01-01

    This report summarizes the results of three years of postoperational aquatic study conducted between 1979 and 1981 at the Bruce Nuclear Power Development site. An increase in the rate of organic and inorganic sedimentation during the summer was noted, and was possibly related to construction activity at the Bruce GS 'B' intake site. Vertical thermal stratification persisted later in the year at the 7 m contour of Bruce GS 'A' discharge than at other locations sampled. Water quality conditions reflected the oliogtrophic state of Lake Huron. Several changes were noted in the biotic community. The taxonomic composition of attached algae, zooplankton and benthic macroinvertebrates varied between sampling years. The number of common naids, amphipods and the trichopteran Cheumatopsyche increased substantially in the 1981 rock cage collections. The relative abundance of adult walleye, channel catfish and round whitefish in gill nets increased, with the former two species being more abundant (15 fish per net in September, 1980, and 33 fish per net in July, 1981, respectively) at the 3 m contour of the Bruce GS 'A' discharge transect than at other shoreline sampling locations

  12. AECB assessment of Bruce A comments on the proposed STPA tritium releases

    International Nuclear Information System (INIS)

    Gerdingh, R.F.

    1995-04-01

    In 1993, Ontario Hydro submitted a proposal to the AECB to discharge slightly tritiated water, arising from the steam supplied by Bruce A, through the Steam Transformer Plant A (STPA) discharge lines. The purpose of the proposal is to eliminate the current practice of shipping this water back to Bruce A where it is discharged through the active liquid waste discharge line. One of the STPA lines discharges to the Bruce A intake channel. A small fraction of this water is processed and used as drinking water at Bruce A. At our request, Bruce A management informed Bruce A personnel of the proposal and gave them the opportunity to raise concerns. As part of our evaluation, we assessed those concerns and concluded that they were not an impediment to accept this proposal. This report documents our assessment of the concerns expressed. (author)

  13. AECB assessment of Bruce A comments on the proposed STPA tritium releases

    Energy Technology Data Exchange (ETDEWEB)

    Gerdingh, R F

    1995-04-01

    In 1993, Ontario Hydro submitted a proposal to the AECB to discharge slightly tritiated water, arising from the steam supplied by Bruce A, through the Steam Transformer Plant A (STPA) discharge lines. The purpose of the proposal is to eliminate the current practice of shipping this water back to Bruce A where it is discharged through the active liquid waste discharge line. One of the STPA lines discharges to the Bruce A intake channel. A small fraction of this water is processed and used as drinking water at Bruce A. At our request, Bruce A management informed Bruce A personnel of the proposal and gave them the opportunity to raise concerns. As part of our evaluation, we assessed those concerns and concluded that they were not an impediment to accept this proposal. This report documents our assessment of the concerns expressed. (author).

  14. Fans af Bruce

    DEFF Research Database (Denmark)

    Vaaben, Nana Katrine

    2007-01-01

    Analysen viser, hvordan det samme ritual under en koncert forener og opdeler de fans, der orienterer sig mod Bruce Springsteen. På den ene side forener ritualet hele publikum i en stor fælles "Intimitet for mange" og på den anden side splitter det dem, fordi det bliver tydeligt, hvem der er de...... rigtige fans, og hvem der tilhører "pøbelen"....

  15. Bruce A restart (execution and lessons-learned)

    International Nuclear Information System (INIS)

    Soini, J.

    2011-01-01

    Lessons learned with the Bruce Units 3 and 4 restart have been incorporated into the current refurbishment of Units 1 and 2. In addition, lessons learned on the lead unit (U2) are aggressively applied on the lagging unit (U1) to maximize efficiency and productivity. There will be a discussion on how this internal OPEX, along with external lessons learned, are used to continuously improve all aspects of the Bruce A Restart project management cycle, from scope selection, through planning and scheduling, to execution.

  16. Bruce A refurbishment - preparatory work completed, major tasks to begin soon

    International Nuclear Information System (INIS)

    Boyd, F.

    2006-01-01

    Over the past year Bruce Power has been planning and organizing for an extensive refurbishment of the Units 1 and 2 of the Bruce A station. Now the company and its several major contractors are ready to proceed with the most challenging aspects of the actual work. The largest tasks are the replacement of the 8 steam generators and of the 480 complete fuel channels in each unit Bruce Power has created a separate website connected to their basic one to provide ongoing information about the progress of the work. The following brief note is intended to provide an outline of this challenging refurbishment program and to invite readers to visit this website to follow its progress. To provide background the writer was accorded an informative and interesting tour of the units by Rob Liddle, of Bruce Power, on September 28, 2006 the day after the ceremony commemorating the Douglas Point station held at the Bruce site. (author)

  17. Steam generator tubesheet waterlancing at Bruce B

    Energy Technology Data Exchange (ETDEWEB)

    Persad, R. [Babcock and Wilcox Canada, Cambridge, Ontario (Canada); Eybergen, D. [Bruce Power, Tiverton, Ontario (Canada)

    2006-07-01

    High pressure water cleaning of steam generator secondary side tubesheet surfaces is an important and effective strategy for reducing or eliminating under-deposit chemical attack of the tubing. At the Bruce B station, reaching the interior of the tube bundle with a high-pressure water lance is particularly challenging due to the requirement to setup on-boiler equipment within the containment bellows. This paper presents how these and other design constraints were solved with new equipment. Also discussed is the application of new high-resolution inter-tube video probe capability to the Bruce B steam generator tubesheets. (author)

  18. David Bruce Payton : väikeriigid mõistavad üksteist / David Bruce Payton ; interv. Marianne Mikko

    Index Scriptorium Estoniae

    Payton, David Bruce

    2003-01-01

    Uus-Meremaa suursaadik Eestis David Bruce Payton talupidaja toetamise loobumisest Uus-Meremaal, Uus-Meremaa põllumajandussektorist, veinidest, ekspordist, Eesti saamisest EL-i ja NATO liikmeks, Uus-Meremaa rahvastikust, elatustasemest, Iraagi võimalikust ründamisest, Põhja-Koreast

  19. Bruce Springsteen as a Symbol

    DEFF Research Database (Denmark)

    Gitz-Johansen, Thomas

    2018-01-01

    The article explores how Bruce Springsteen and his music function as a symbol. The article first presents the Jungian theory of symbols and of music as symbol. The central argument of the article is that, by functioning symbolically, Springsteen has the potential to influence the psyche of his au...

  20. Challenges of restarting Bruce Units 3 and 4 from a chemistry and materials perspective

    International Nuclear Information System (INIS)

    Roberts, J.G.; Langguth, K.

    2005-01-01

    In 2001, Bruce Power leased the Bruce Units 1-8 reactors from Ontario Power Generation. Bruce Power decided to restart Bruce Units 3 and 4 following a condition assessment of Bruce A Units 3 and 4. This paper describes the challenges that were encountered and how they were overcome, specifically for heat transport system chemistry in order to adequately protect carbon steel surfaces. The heat transport system, by design, has close inter-relations with other station systems and the related issues of some of these systems are also discussed. Considerations of material impacts have significant influences on the approach to, and control of, chemistry. Specific material impacts led to a novel, and successful, approach. This approach was arrived at following significant efforts by a multi-disciplinary team of operations, maintenance and chemistry staff. The issues, approaches considered and solutions used for a successful outcome will be presented. (author)

  1. Challenges of restarting Bruce Units 3 and 4 from a chemistry and materials perspective

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, J.G.; Langguth, K. [Bruce Power, Tiverton, Ontario (Canada)

    2005-07-01

    In 2001, Bruce Power leased the Bruce Units 1-8 reactors from Ontario Power Generation. Bruce Power decided to restart Bruce Units 3 and 4 following a condition assessment of Bruce A Units 3 and 4. This paper describes the challenges that were encountered and how they were overcome, specifically for heat transport system chemistry in order to adequately protect carbon steel surfaces. The heat transport system, by design, has close inter-relations with other station systems and the related issues of some of these systems are also discussed. Considerations of material impacts have significant influences on the approach to, and control of, chemistry. Specific material impacts led to a novel, and successful, approach. This approach was arrived at following significant efforts by a multi-disciplinary team of operations, maintenance and chemistry staff. The issues, approaches considered and solutions used for a successful outcome will be presented. (author)

  2. Universal delivery machine - design of the Bruce and Darlington heads

    International Nuclear Information System (INIS)

    Gray, M.G.; Brown, R.

    2003-01-01

    The Universal Delivery Machine (UDM) was designed and supplied to reduce the time required to perform channel inspection services. The Bruce UDM was the first to be completed followed by Pickering and Darlington. The Bruce and Darlington machines are nearly identical. Design concepts applied include a rotating, multiple tool station magazine, a rigid chain driving telescoping rams, a common drive package, and an external support frame to meet seismic qualification requirements. (author)

  3. Bruce used fuel dry storage project evolution from Pickering to Bruce

    International Nuclear Information System (INIS)

    Young, R.E.

    1996-01-01

    Additional fuel storage capacity is required at Bruce Nuclear Generating Station, which otherwise would soon fill up all its pool storage capacity. The recommended option was to use a dry storage container similar to that at Pickering. The changes made to the Pickering type of container included: fuel to be stored in trays; the container's capacity increased to 600 bundles; the container's lid to be changed to a metal one; the single concrete lid to be changed to a double metal lid system; the container not to be transportable; the container would be dry-loaded. 7 figs

  4. Bruce used fuel dry storage project evolution from Pickering to Bruce

    Energy Technology Data Exchange (ETDEWEB)

    Young, R E [Ontario Hydro, Tiverton, ON (Canada). Bruce Nuclear Generating Station-A

    1997-12-31

    Additional fuel storage capacity is required at Bruce Nuclear Generating Station, which otherwise would soon fill up all its pool storage capacity. The recommended option was to use a dry storage container similar to that at Pickering. The changes made to the Pickering type of container included: fuel to be stored in trays; the container`s capacity increased to 600 bundles; the container`s lid to be changed to a metal one; the single concrete lid to be changed to a double metal lid system; the container not to be transportable; the container would be dry-loaded. 7 figs.

  5. Instrument calibration optimization at Bruce Power: ECI loops

    International Nuclear Information System (INIS)

    Chugh, V.; Angelova, M.; Ghias, S.; Parmar, R.; Wang, V.; Xie, H.; Higgs, J.; Schut, J.; Cruchley, I.

    2011-01-01

    Most instruments in a nuclear power plant are calibrated at regular intervals to ensure consistency with the assumptions in the plant Technical Specifications and/or Safe Operating Envelope (SOE) compliance limits (e.g., As-Found Tolerance). In the Instrument Uncertainty Calculations (IUC), As-Found Tolerance for instrument drift is estimated based on statistical analysis of As-Found and As-Left calibration data such as that carried out for Bruce NGS by EPRI (Electric Power Research Institute) in 1998. Bruce specific drift values were found to compare favorably with industry benchmarks. Recently a significant amount of work has been done by EPRI and IAEA (International Atomic Energy Agency) on extending calibration intervals of safety related instruments. Reduction in calibration frequency reduces time commitments on the part of Authorized Nuclear Operators and safety system qualified Control Maintenance Technicians, and allows more schedule flexibility. To establish the proof of concept, As-Left/As-Found tolerances and available margins have been evaluated for the Bruce B Emergency Coolant Injection (ECI) system instrument loops to determine whether an extension of the calibration period from one or two year to three years is justifiable on the basis that these loops will still be in compliance with SOE. The analysis showed that 60% of instruments in the ECI system are qualified for calibration interval extension up to three years. Sensitivity assessment of the effect of proposed changes in calibration intervals for 60% of the instruments on the ECI system unavailability has also been performed using the current Bruce Power ECI unavailability model. The results show that, the largest ECI Predicted Future Unavailability (PFU) is 9.2E-4 year/year for in-core LOCA accident. This value is still below the target unavailability of 1.0E-3 year/year. (author)

  6. Instrument calibration optimization at Bruce Power: ECI loops

    Energy Technology Data Exchange (ETDEWEB)

    Chugh, V.; Angelova, M.; Ghias, S.; Parmar, R.; Wang, V.; Xie, H. [AMEC NSS, Toronto, Ontario (Canada); Higgs, J.; Schut, J.; Cruchley, I. [Bruce Power, Tiverton, Ontario (Canada)

    2011-07-01

    Most instruments in a nuclear power plant are calibrated at regular intervals to ensure consistency with the assumptions in the plant Technical Specifications and/or Safe Operating Envelope (SOE) compliance limits (e.g., As-Found Tolerance). In the Instrument Uncertainty Calculations (IUC), As-Found Tolerance for instrument drift is estimated based on statistical analysis of As-Found and As-Left calibration data such as that carried out for Bruce NGS by EPRI (Electric Power Research Institute) in 1998. Bruce specific drift values were found to compare favorably with industry benchmarks. Recently a significant amount of work has been done by EPRI and IAEA (International Atomic Energy Agency) on extending calibration intervals of safety related instruments. Reduction in calibration frequency reduces time commitments on the part of Authorized Nuclear Operators and safety system qualified Control Maintenance Technicians, and allows more schedule flexibility. To establish the proof of concept, As-Left/As-Found tolerances and available margins have been evaluated for the Bruce B Emergency Coolant Injection (ECI) system instrument loops to determine whether an extension of the calibration period from one or two year to three years is justifiable on the basis that these loops will still be in compliance with SOE. The analysis showed that 60% of instruments in the ECI system are qualified for calibration interval extension up to three years. Sensitivity assessment of the effect of proposed changes in calibration intervals for 60% of the instruments on the ECI system unavailability has also been performed using the current Bruce Power ECI unavailability model. The results show that, the largest ECI Predicted Future Unavailability (PFU) is 9.2E-4 year/year for in-core LOCA accident. This value is still below the target unavailability of 1.0E-3 year/year. (author)

  7. Bruce A - performance power

    Energy Technology Data Exchange (ETDEWEB)

    Boucher, P. [Bruce Power, Tiverton, ON (Canada)

    2015-07-01

    This paper discusses the strategy for improving performance at Bruce Power. The key to excellence is changing behaviours. Reinforcing and enforcing expectations, aligned with the 2015 operating to the Highest Standards Site Initiative. Long term equipment strategies, supported by the 2015 Equipment Health Site Initiative, individual and group accountability for online/outage Work Management, with further gains through 2015 Maintenance Alignment and Resource Strategy (MARS) Site Initiative. Results showed human performance improvement, more reliable and predictable units and outage performance improvement.

  8. CECIL lances Bruce's boilers

    International Nuclear Information System (INIS)

    Malaugh, J.; Monaghan, D.

    1994-01-01

    Over the past few years Ontario Hydro has become increasingly concerned about accumulations of sludge in its nuclear plant boilers, so a comprehensive sludge management programme has been instituted to combat build-up. This included developing the tele-operated robot CECIL (Consolidated Edison Combined Inspection and Lancing) equipment, originally designed for work in PWRs, for CANDU boilers. This required a significantly reconfigured robotic system as well as modifications to the boilers themselves. Work on the Bruce A reactor is described. (4 figures). (author)

  9. Forging Futures with Teens and Science Fiction: A Conversation with Greg Bear and David Brin.

    Science.gov (United States)

    Moltz, Sandy

    2003-01-01

    Presents an interview with Greg Bear and David Brin, two science fiction writers who started Reading for the Future, an international project geared toward secondary school students that shows teachers and librarians how science fiction inspires young readers. Discusses programs that have come out of this group; standards for books geared toward…

  10. The Bruce Medalists

    Science.gov (United States)

    Tenn, J. S.

    2001-12-01

    The Astronomical Society of the Pacific (ASP) has presented the Catherine Wolfe Bruce gold medal for lifetime contributions to astronomy most years since 1898. The 94 medalists include most of the scientists whose work has greatly changed astronomy since the late nineteenth century: Huggins, Pickering, Campbell, Hale, Eddington, Russell, Adams, Slipher, Hertzsprung, Hubble, Shapley, Oort, Baade, ... Major exceptions include those who died young, those who worked in teams, and, in the early years, women. Mathematicians appear to have been as likely to be honored as astronomers from the beginning, but the fortunes of physicist nominees have varied. The nomination process is an unusual one, with the directors of six observatories, three in the U.S. and three abroad, asked to nominate up to three candidates each year. For the first six decades the observatories rarely varied, and directors had long tenures. They nominated the same individuals repeatedly. Now both observatories and their directors vary regularly. Much can be learned about the changes in astronomy from the late nineteenth century, when observers worked alone with long refractors and a theorist could spend a lifetime computing the orbit of one comet, to the present, when most papers have multiple authors and a single project may include millions of objects. For example, celestial mechanics was the specialty of many of the early medalists but none since 1966. I have posted photographs, brief biographies, extensive bibliographies, and links to publications by and about all of the medalists, from Simon Newcomb in 1898 to Hans Bethe in 2001, at http://phys-astro.sonoma.edu/BruceMedalists/. I will discuss a bit of the history of the medal and some of the medalists.

  11. Non intrusive check valve diagnostics at Bruce A

    International Nuclear Information System (INIS)

    Marsch, S.P.

    1997-01-01

    Bruce A purchased non intrusive check valve diagnostic equipment in 1995 to ensure operability and availability of critical check valves in the Station. Diagnostics can be used to locate and monitor check valve degradation modes. Bruce A initiated a pilot program targeting check valves with flow through them and ones that completed open or close cycles. Approaches to determine how to confirm operability of passive check valves using non intrusive techniques were explored. A sample population of seventy-three check valves was selected to run the pilot program on prior to complete implementation. The pilot program produced some significant results and some inconclusive results. The program revealed a major finding that check valve performance modeling is required to ensure continuous operability of check valves. (author)

  12. Non intrusive check valve diagnostics at Bruce A

    Energy Technology Data Exchange (ETDEWEB)

    Marsch, S.P. [Ontario Hydro, Bruce Nuclear Generating Station A, Tiverton, ON (Canada)

    1997-07-01

    Bruce A purchased non intrusive check valve diagnostic equipment in 1995 to ensure operability and availability of critical check valves in the Station. Diagnostics can be used to locate and monitor check valve degradation modes. Bruce A initiated a pilot program targeting check valves with flow through them and ones that completed open or close cycles. Approaches to determine how to confirm operability of passive check valves using non intrusive techniques were explored. A sample population of seventy-three check valves was selected to run the pilot program on prior to complete implementation. The pilot program produced some significant results and some inconclusive results. The program revealed a major finding that check valve performance modeling is required to ensure continuous operability of check valves. (author)

  13. An Appreciation of the Scientific Life and Acheivements of Bruce Merrifield

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, R

    2007-06-15

    Bruce Merrifield's scientific biography, 'Life During a Golden Age of Peptide Chemistry: The Concept and Development of Solid-Phase Peptide Synthesis', provides a history of solid phase-peptide synthesis (SPPS) from 1959 to 1993 [1]. While many readers will be familiar with SPPS literature after 1963, the inclusion of unpublished material from Merrifield's early laboratory notebooks opens a fascinating window on the development of SPPS from the formulation of concept in 1959 (p. 56, ref. 1) to the synthesis of a tetrapeptide four years later [2]. This early period was characterized by slow progress interrupted by numerous setbacks that led Bruce to later record (p. 90, ref. 1): 'At the end of the first two years the results were so poor, I wonder what made me think that this approach would ever succeed; but from the outset I had a strong conviction that this was a good idea, and I am glad that I stayed with it long enough'. Garland Marshall, Bruce's first graduate student (1963-1966), as well as later colleagues, were essentially unaware of the many highways, byways and dead ends that Bruce had explored in the early years [3].

  14. Bruce NGS A Unit 4 preheater divider plate failure

    International Nuclear Information System (INIS)

    Landridge, M.; McInnes, D.

    1995-01-01

    On May 19, 1995, without any prior operational indications, Bruce A discovered preheater divider plate damage in Unit 4 that had the potential to have a major impact on the continued safe operation of the station. Further investigations indicated that Unit 4 may have been operating with this damage for as long as ten years. In the two months following the discovery, Bruce A has procured and replaced the 4 divider plates, located most of the missing pieces, retrieved pieces from the PHT system, investigated historical operational information, performed detailed analytical investigations, investigated root cause, performed in-situ and mock-up testing, updated operational procedures and installed DP monitoring equipment

  15. AECB staff annual assessment of the Bruce A Nuclear Generating Station for the year 1995

    International Nuclear Information System (INIS)

    1996-06-01

    The Atomic Energy Control Board conducts a staff assessment of safety at Bruce Nuclear Generating Station A for 1995. On-site Project Officers and Ottawa based specialists monitored the station throughout the year. Ontario Hydro operated Bruce A safely in 1995, maintaining the risk to workers and the public at an acceptably low level. Radiation doses to workers and releases to the environment were well below regulatory limits. However, Ontario Hydro must improve contamination control at Bruce A. Special safety system performance a Bruce A was less than adequate. The negative pressure containment system and units 4's shutdown system two exceeded unavailability targets in 1995. However, we are satisfied Ontario Hydro is taking appropriate action to correct this. 5 tabs., 5 figs

  16. Bruce Power's nuclear pressure boundary quality assurance program requirements, implementation and transition

    International Nuclear Information System (INIS)

    Krane, J.C.

    2009-01-01

    The development of a full scope nuclear pressure boundary quality assurance program in Canada requires extensive knowledge of the structure and detailed requirements of codes and standards published by the Canadian Standards Association (CSA) and American Society of Mechanical Engineers (ASME). Incorporation into company governance documents and implementation of these requirements while managing the transition to more recent revisions of these codes and standards represents a significant challenge for Bruce Power, Canada's largest independent nuclear operator. This paper explores the key developments and innovative changes that are used to ensure successful regulatory compliance and effective implementation of the Bruce Power Pressure Boundary Quality Assurance Program. Challenges and mitigating strategies to sustain this large compliance based program at Bruce Power's 8 unit nuclear power plant site will also be detailed. (author)

  17. AECB staff annual report of Bruce NGS 'B' for the year 1988

    International Nuclear Information System (INIS)

    1989-05-01

    The operation of the Bruce 'B' Nuclear Generating Station is monitored and licensing requirements are enforced by the Atomic Energy Control Board (AECB) Bruce project staff, with appropriate support from other AECB personnel. The staff observes operation of the reactors, conducts audits, witnesses important activities, reviews station documentation and reports, and issues approvals where appropriate in accordance with license conditions. As required by a condition of its Operating Licence, Ontario Hydro each year submits Technical Reports which summarize various aspects of the operation of Bruce NGS 'B' during the year. When these reports have been reviewed by AECB staff, a formal Annual Review Meeting is held with the station management to discuss safety-related aspects of the station operation, and to inform Ontario Hydro of AECB staff conclusions with respect to the performance of Ontario Hydro in operating the station during the year

  18. Exercise testing of pre-school children using the Bruce treadmill protocol: new reference values

    NARCIS (Netherlands)

    M.H.M. van der Cammen-van Zijp (Monique); H. IJsselstijn (Hanneke); T. Takken (Tim); S.P. Willemsen (Sten); D. Tibboel (Dick); H.J. Stam (Henk); H.J.G. van den Berg-Emons (Rita)

    2010-01-01

    textabstractThe Bruce treadmill protocol is an often-used exercise test for children and adults. Few and mainly old normative data are available for young children. In this cross-sectional observational study we determined new reference values for the original Bruce protocol in children aged 4 and 5

  19. AECB staff annual assessment of the Bruce B Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Bruce Nuclear Generating Station B for 1996. It was concluded that Ontario Hydro operated Bruce B safely in 1996. Although the Bruce B plant is safe,it was noted that the number of outages and the number of secondary and tertiary equipment failures during reactor unit upsets increased. Ontario Hydro needs to pay special attention to prevent such a decrease in the safety performance at Bruce B

  20. Geoscientific Characterization of the Bruce Site, Tiverton, Ontario

    Science.gov (United States)

    Raven, K.; Jackson, R.; Avis, J.; Clark, I.; Jensen, M.

    2009-05-01

    Ontario Power Generation is proposing a Deep Geologic Repository (DGR) for the long-term management of its Low and Intermediate Level Radioactive Waste (L&ILW) within a Paleozoic-age sedimentary sequence beneath the Bruce site near Tiverton, Ontario, Canada. The concept envisions that the DGR would be excavated at a depth of approximately 680 m within the Ordovician Cobourg Formation, a massive, dense, low- permeability, argillaceous limestone. Characterization of the Bruce site for waste disposal is being conducted in accordance with a four year multi-phase Geoscientific Site Characterization Plan (GSCP). The GSCP, initially developed in 2006 and later revised in 2008 to account for acquired site knowledge based on successful completion of Phase I investigations, describes the tools and methods selected for geological, hydrogeological and geomechanical site characterization. The GSCP was developed, in part, on an assessment of geoscience data needs and collection methods, review of the results of detailed geoscientific studies completed in the same bedrock formations found off the Bruce site, and recent international experience in geoscientific characterization of similar sedimentary rocks for long-term radioactive waste management purposes. Field and laboratory work related to Phase 1 and Phase 2A are nearing completion and have focused on the drilling, testing and monitoring of four continuously cored vertical boreholes through Devonian, Silurian, Ordovician and Cambrian bedrock to depths of about 860 mBGS. Work in 2009 will focus on drilling and testing of inclined boreholes to assess presence of vertical structure. The available geological, hydrogeological and hydrogeochemical data indicate the presence of remarkably uniform and predictable geology, physical hydrogeologic and geochemical properties over well separation distances exceeding 1 km. The current data set including 2-D seismic reflection surveys, field and lab hydraulic testing, lab petrophysical and

  1. The fuel string relocation effect - why the Bruce reactors were derated

    Energy Technology Data Exchange (ETDEWEB)

    Gold, M; Farooqui, M Z; Adebiyi, A S; Chu, R Y; Le, N T; Oliva, A F [Ontario Hydro, Toronto, ON (Canada); Balog, G; Qu, T; DeBuda, P G [Ontario Hydro, Tiverton, ON (Canada). Bruce Nuclear Generating Station-A

    1996-12-31

    In the CANDU Safety Analysis process, a series of design basis accidents are chosen and analyzed to confirm safety system effectiveness. Of all the postulated accidents, the Large Break Loss of Coolant Accident (LBLOCA) - a postulated break in the Heat Transport System piping near a component that services a large number of fuel channels - sets the most demanding requirements on the speed and reactivity depth of the shutdown system devices - shutoff rods and liquid poison injection. While the event is extremely improbable, it is reanalyzed periodically and its consequences examined to ensure continued shutdown system effectiveness. In March 1993, an additional effect was identified: if the break occurred in the piping on the inlet side of the core, this would cause sudden movement of the fuel bundles (so-called fuel string relocation) in a large number of channels. In Ontario Hydro`s Bruce NGS A, Bruce NGS B and Darlington reactors, each channel is fuelled against the flow. In this situation, the relocation of the fuel string results in a sudden positive reactivity increase. This reactivity increase is in addition to the reactivity due to the core coolant voiding. The combined reactivity effect could lead to power pulses much higher than those that would arise due to coolant voiding alone. To maintain safety margins in the event of such a postulated accident, the eight Bruce NGS A and Bruce NGS B units were initially derated to 60 percent power within 2 days of the identification and confirmation of this effect. This paper: describes the fuel string relocation phenomenon in detail; explains why the consequences differ at the various Ontario Hydro reactors; outlines the actions taken with respect to each of the Ontario Hydro reactors in the months following March 1993; describes the design solutions implemented to mitigate the problem and return the Bruce reactors to higher powers. 6 refs., 1 tab., 6 figs.

  2. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    Hart, R.S.

    2006-01-01

    The Bruce A Generating Station consists of four 900 MW class CANDU units. The reactor and Primary Heat Transport System for each Unit are housed within a reinforced concrete reactor vault. A large duct running below the reactor vaults accommodates the shared fuel handling system, and connects the four reactor vaults to the vacuum building. The reactor vaults, fuelling system duct and the vacuum building constitute the station vacuum containment system. Bruce A Unit 2 was shut down in 1995 and Bruce A Units 1, 3 and 4 were shutdown in 1997. Bruce A Units 3 and 4 were returned to service in late 2003 and are currently operating. Units 1 and 2 remain out of service. Bruce Power is currently undertaking a major rehabilitation of Bruce A Unit 1 and Units 2 that will extend the in-service life of these units by at least 25 years. Replacement of the Steam Generators (eight in each unit) is required; this work was awarded to SNC-Lavalin Nuclear (SLN). The existing steam drums (which house the steam separation and drying equipment) will be retained. Unit 2 is scheduled to be synchronized with the grid in 2009, followed by Unit 1 in 2009. Each Bruce A unit has two steam generating assemblies, one located above and to each end of the reactor. Each steam generating assembly consists of a horizontal cylindrical steam drum and four vertical Steam Generators. The vertical Steam Generators connect to individual nozzles that are located on the underside of the Steam Drum (SD). The steam drums are located in concrete shielding structures (steam drum enclosures). The lower sections of the Steam Generators penetrate the top of the reactor vaults: the containment pressure boundary is established by bellows assemblies that connect between the reactor vault roof slab and the Steam Generators. Each Steam Generators is supported from the bottom by a trapeze that is suspended from the reactor vault top structure. The Steam Generator Replacement (SGR) methodology developed by SLN for Unit 1

  3. Waste repository planned for Bruce Site

    International Nuclear Information System (INIS)

    King, F.

    2004-01-01

    Ontario Power Generation (OPG) and Kincardine, the municipality nearest the Bruce site, have agreed in principal to the construction of a deep geologic repository for low and medium level radioactive waste on the site. The two parties signed the 'Kincardine Hosting Agreement' on October 13, 2004 to proceed with planning, seek regulatory approval and further public consultation of the proposed project. A construction Licence is not expected before 2013. (author)

  4. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    Hart, R.S.

    2007-01-01

    The Bruce A Generating Station consists of four 900 MW class CANDU units. The reactor and Primary Heat Transport System for each Unit are housed within a reinforced concrete reactor vault. A large duct running below the reactor vaults accommodates the shared fuel handling system, and connects the four reactor vaults to the vacuum building. The reactor vaults, fuelling system duct and the vacuum building constitute the station vacuum containment system. Bruce A Unit 2 was shut down in 1995 and Bruce A Units 1, 3 and 4 were shutdown in 1997. Bruce A Units 3 and 4 were returned to service in late 2003 and are currently operating. Units 1 and 2 remain out of service. Bruce Power is currently undertaking a major rehabilitation of Bruce A Unit 1 and Unit 2 that will extend the in-service tile of these units by at least 25 years. Replacement of the Steam Generators (eight in each unit) is required; this work was awarded to SNC-Lavalin Nuclear (SLN). The existing steam drums (which house the steam separation and drying equipment) will be retained. Unit 2 is scheduled to be synchronized with the grid in 2009, followed by Unit 1 in 2009. Each Bruce A unit has two steam generating assemblies, one located above and to each end of the reactor. Each steam generating assembly consists of a horizontal cylindrical steam drum and four vertical Steam Generators. The vertical Steam Generators connect to individual nozzles that are located on the underside of the Steam Drum (SD). The steam drums are located in concrete shielding structures (steam drum enclosures). The lower sections of the Steam Generators penetrate the top of the reactor vaults: the containment pressure boundary is established by bellows assemblies that connect between the reactor vault roof slab and the Steam Generators. Each Steam Generators is supported from he bottom by a trapeze that is suspended from the reactor vault top structure. The Steam Generator Replacement (SGR) methodology developed by SLN for Unit 1

  5. Status of the reliability centered maintenance program at Ontario Hydro's Bruce 'A' Nuclear Division

    International Nuclear Information System (INIS)

    Khan, I.

    1995-01-01

    Bruce A started a preventive maintenance (PM) quality improvement program in August of 1991. This initiative was taken to address the concerns expressed by the AECB and the Peer Audits finding. The concerns were on the quality of the Bruce A PM Program and its execution in the field. Reliability Centered Maintenance (RCM) analysis was selected as the PM program quality improvement and optimization technique. Therefore, RCM became a key component of Bruce A's Integrated PM program and maintenance strategy. As a result of RCM implementation, and improvements in the work planning and scheduling process, Bruce A is seeing downward trends in the corrective maintenance work load, maintenance preventable forced outages, overdue/missed PM tasks and corrective maintenance backlog. Control Room Operators have reported observing an improvement in systems and equipment response to transients. Other benefits include a documented, controlled and traceable PM program. In addition, the team approach required by RCM has started to improve staff confidence in the PM program which, in turn, is improving the compliance with the PM program. (author)

  6. Ontario Hydro's operating experience with steam generators with specifics on Bruce A and Bruce B problems

    Energy Technology Data Exchange (ETDEWEB)

    Eatock, J W; Patterson, R W [Ontario Hydro, Toronto, ON (Canada); Dyck, R W [Ontario Hydro, Central Production Services Division, Toronto, ON (Canada)

    1991-04-01

    The performance of the steam generators in Ontario Hydro nuclear power stations is reviewed. This performance has generally been outstanding compared to world averages, with very low tube failure and plugging rates. Steam generator problems have made only minor contributions to Ontario Hydro nuclear station incapability factors. The mechanisms responsible for the the observed tube degradation and failures are described. The majority of the leaks have been due fatigue in the U-bend of the Bruce 'A' steam generators. There have been very few failures attributed to corrosion of the three tube materials used in Ontario Hydro steam generators. Recent performance has been deteriorating primarily due to deposit accumulation in the steam generators. Plugging of the broached holes in the upper support plates at Bruce 'A' has caused some derating of two units. Increases have been observed in the primary heat transport system reactor inlet temperature of several units. These increases may be attributed to steam generator tube surface fouling. In addition, several units have accumulated deep, hard sludge piles on the tube sheet, although little damage been observed. Recently some fretting of tubes has been observed at BNGSB in the U-bend support region. Remedial measures are being taken to address the current problems. Solutions are being evaluated to reduce the generation of corrosion products in the feedtrain and their subsequent transport to the steam generators. (author)

  7. Ontario Hydro's operating experience with steam generators with specifics on Bruce A and Bruce B problems

    International Nuclear Information System (INIS)

    Eatock, J.W.; Patterson, R.W.; Dyck, R.W.

    1991-01-01

    The performance of the steam generators in Ontario Hydro nuclear power stations is reviewed. This performance has generally been outstanding compared to world averages, with very low tube failure and plugging rates. Steam generator problems have made only minor contributions to Ontario Hydro nuclear station incapability factors. The mechanisms responsible for the the observed tube degradation and failures are described. The majority of the leaks have been due fatigue in the U-bend of the Bruce 'A' steam generators. There have been very few failures attributed to corrosion of the three tube materials used in Ontario Hydro steam generators. Recent performance has been deteriorating primarily due to deposit accumulation in the steam generators. Plugging of the broached holes in the upper support plates at Bruce 'A' has caused some derating of two units. Increases have been observed in the primary heat transport system reactor inlet temperature of several units. These increases may be attributed to steam generator tube surface fouling. In addition, several units have accumulated deep, hard sludge piles on the tube sheet, although little damage been observed. Recently some fretting of tubes has been observed at BNGSB in the U-bend support region. Remedial measures are being taken to address the current problems. Solutions are being evaluated to reduce the generation of corrosion products in the feedtrain and their subsequent transport to the steam generators. (author)

  8. Clean energy for a new generation. Steam generator life cycle management and Bruce restart

    International Nuclear Information System (INIS)

    Newman, G.W.

    2009-01-01

    In the mid to late 1990s, Ontario Hydro decided to lay-up and write-down the Bruce A Nuclear Reactors. Upon transition to Bruce Power L.P., Canada's first and only private nuclear operator, new life and prospects were injected into the site, local economy and the provincial energy portfolio. The first step in this provincial power recovery initiative involved restart of Bruce Units 3 and 4 in the 2003/04 time-frame. Units 3 and 4 have performed beyond expectation during the last five-year operating interval. A combination of steam generator and fuel channel issues precluded a similar restart of Units 1 and 2. Enter the refurbishment of Bruce Units 1 and 2. This first-of-a-kind undertaking within the Canadian nuclear power industry is testament to the demonstrated industry leadership by Bruce Power L.P., their investors and the significant vendor community contribution that is supporting this major power infrastructure enhancement. Initiated as a 'turn-key' project solution separated from the operating units, this major refurbishment project has evolved to a fully managed in-house refurbishment project with the continued support from the broader vendor community. As part of this first-of-kind undertaking, Bruce Power L.P. is in the process of accomplishing such initiatives as a complete fuel channel re-tube (i.e. full core calandria and pressure tube replacement), replacement of all boilers (i.e. 16 in total) and the majority of feeder pipe replacement. Complimentary major upgrades and replacement of the remainder of plant equipment including both nuclear and non-nuclear valves, heat exchangers, electrical infrastructure, service water systems and components, all while meeting a parallel evolving/maturing regulatory environment related to achieving compliance with IAEA derived modern codes and standards. Returning to ground level, boiler replacement is a key part of the refurbishment undertaking and this further reflected a meeting of the 'old' and the 'new'. Pre

  9. Ion chamber repairs in Bruce A

    International Nuclear Information System (INIS)

    Millard, J.; Edwards, T.; Kerker, J.; Pletch, R.; Edwards, T.

    2012-01-01

    This paper discusses identification and successful remediation of leakage of shield tank water on vertical and horizontal Ion Chambers in Bruce A. In doing so, it discusses real events moving from the initial investigation to understand the problem, through looking at options for solutions, and moving to site work and actual resolution.. In multiunit 900 MW class CANDU® reactors, the calandria vessel is suspended within a larger shield tank. Due to temperature changes or changes in moderator fluid levels in the calandria, the calandria can move relative to the shield tank and its reactivity deck. Thimbles which contain the reactivity sensors and controls connect the two vessels and allow the reactivity drives and controls connections to be placed on the deck structure on the top of the reactor assembly for RRS and SDS1 and horizontally for SDS2. These thimbles have expansion joints with metal bellows where they meet the deck structure or shield tank walls. The deck structure lies on a vault containment boundary. The horizontal ion chambers are not in the containment boundary as they connect the outside of the calandria and shield tank around mid plane in the reactor vault, but due to geometry difference provides a more challenging work environment. Bruce had a beetle alarm (1-63851-MIA2-ME30 in alarm state (vertical IC housing)) at the start of April 2012 on Unit 1 channel F vertical Ion chamber expansion joint at the deck connection. This occurred after the moderator levels had been raised after the several years long refurbishment outage and the expansion joint had a significant travel. The investigation showed shield tank water in the collection chamber at the beetle. In addition, Channel J of the horizontal ion chamber had a seized instrument, which on removal was found to relate to oxide build up as a result of minor water leakage into the site. Repairs in both cases were performed as part of the long Bruce 1 & 2 refurbishment outage to completely stop the

  10. Fire fighting capability assessment program Bruce B NGS

    International Nuclear Information System (INIS)

    1995-05-01

    This is a report on the completion of work relating to the assessment of the capability of Bruce B NGS to cope with a large fire incident. This included an evaluation of an exercise scenario that would simulate a large fire incident and of their fire plans and procedures. Finally the execution of fire plans by Bruce B NGS, as demonstrated by their application of human and material resources during a simulated large fire, was observed. The fire fighting equipment and the personal protective clothing and associated equipment that was in use was all of good quality and in good condition. There had also been notable improvement in communications equipment. Similarly, the human resources that had been assigned to fire fighting and rescue crews and that were available were more than adequate. Use of a logical incident command system, and the adoption of proper policy and procedures for radio communications were equally significant improvements. Practice should correct the breakdowns that occurred in these areas during the exercise. As well, there remains a need for the development of policy on fire fighting and rescue operations with more depth and clarity. In summary, the key point to be recognized is the degree of improvement that has been realized since the previous evaluation in 1990. Clearly the Emergency Response Teams organization of Bruce B NGS is evolving into an effective fire fighting force. Providing that the deficiencies identified in this report are addressed satisfactorily, Fire Cross is confident that the organization will have the capability to provide rescue and fire fighting services that will satisfy the need. 2 figs

  11. Projecting Dynastic Majesty: State Ceremony in the Reign of Robert Bruce

    Directory of Open Access Journals (Sweden)

    Lucinda Dean

    2015-07-01

    Full Text Available Following the murder of his rival John Comyn on 10 February at Greyfriars in Dumfries, and the crisis this act incited, Robert the Bruce’s inaugural ceremony took place at Scone in late March 1306. Much about this ceremony is speculative; however, subsequent retrospective legitimisation of the Bruce claims to the royal succession would suggest that all possible means by which Robert’s inauguration could emulate his Canmore predecessors and outline his right to rule on a level playing field with his contemporaries were amplified, particularly where they served the common purpose of legitimising Robert’s highly questioned hold on power. Fourteenth-century Scottish history is inextricably entwined in the Wars of Independence, civil strife and an accelerated struggle for autonomous rule and independence. The historiography of this period is unsurprisingly heavily dominated by such themes and, while this has been offset by works exploring subjects such as the tomb of Bruce and the piety of the Bruce dynasty, the ceremonial history of this era remains firmly in the shadows. This paper will address three key ceremonies through which a king would, traditionally, make powerful statements of royal authority: the inauguration or coronation of Bruce; the marriage of his infant son to the English princess Joan of the Tower in 1328, and his extravagant funeral ceremony in 1329. By focusing thus this paper hopes to shed new light on the ‘dark and drublie days’ of fourteenth-century Scotland and reveal that glory, dynastic majesty and pleasure were as central to the Scottish monarchy in this era as war and political turbulence.

  12. Bruce and Darlington power pulse and pressure tube integrity programs -status 1995

    Energy Technology Data Exchange (ETDEWEB)

    Field, G J [Atomic Energy of Canada Ltd., Mississauga, ON (Canada); Wylie, J [Ontario Hydro, Tiverton, ON (Canada). Bruce Nuclear Generating Station-A

    1996-12-31

    The optimum solution to pressure tube fretting at the inlet of the Bruce and Darlington channels, a concern which became very serious following inspections in early 1992, is to remove the inlet bundle and operate with a 12 fuel bundle channel. During analysis of this operating mode a `power pulse` was identified which could occur during an inlet header break where all the fuel in the channel moved rapidly to the inlet of the channel. The pulse was unacceptable and the units were derated until solutions could be implemented. A number of solutions were identified and each station has begun implementation of their specific solution. Implementation has not been without problems and this paper provides a status report on the progress to date of the long bundle implementation solution for Bruce B and Darlington and the fuelling with the flow solution being implemented at Bruce A. Both types of solution have a significant impact on the original concern, fretting of the pressure tube. (author). 1 ref., 6 figs.

  13. Fuel defect detection, localization and removal in Bruce Power units 3 through 8

    International Nuclear Information System (INIS)

    Stone, R.; Armstrong, J.; Iglesias, F.; Oduntan, R.; Lewis, B.

    2005-01-01

    Fuel element defects are occurring in Bruce 'A' and Bruce 'B' Units. A root-cause investigation is ongoing, however, a solution is not yet in-hand. Fuel defect management efforts have been undertaken, therefore, in the interim. Fuel defect management tools are in-place for all Bruce Units. These tools can be categorized as analysis-based or operations-based. Analysis-based tools include computer codes used primarily for fuel defect characterization, while operations-based tools include Unit-specific delayed-neutron ('DN') monitoring systems and gaseous fission product ('GFP') monitoring systems. Operations-based tools are used for fuel defect detection, localization and removal activities. Fuel and Physics staff use defect detection, localization and removal methodologies and guidelines to disposition fuel defects. Methodologies are 'standardized' or 'routine' procedures for implementing analysis-based and operations-based tools to disposition fuel defects during Unit start-up operation and during operation at high steady-state power levels. Guidelines at present serve to supplement fuel defect management methodologies during Unit power raise. (author)

  14. AECB staff annual report of Bruce Heavy Water Plant operation for the year 1991

    International Nuclear Information System (INIS)

    1992-11-01

    Bruce Heavy Water Plant operation was acceptably safe in 1991. There were no breaches of any of the regulations issued under the authority of the Atomic Energy Control Act. There was one violation of the operating licence. For one hour on October 30, 1991, water leaving the plant contained more hydrogen sulphide than Ontario regulations allow. There was no threat to public health or safety or harm to the environment as a result of this violation. One worker was overcome by hydrogen sulphide. The worker did not lose consciousness, but had the symptoms of H 2 S poisoning. Ontario Hydro took actions to increase awareness of the Operating Policy and Principles at Bruce Heavy Water Plant during 1991. All personnel attended a training course, and Ontario Hydro is reviewing all Bruce Heavy Water Plant documentation to ensure it is consistent with the Operating Policies and Principles. Ontario Hydro met 13 of 15 safety-related system availability targets. The AECB is satisfied appropriate action is being taken to improve the performance of the other two systems. Ontario Hydro continued to put heavy emphasis on safety training; however, they did not meet some of their other training targets. Ontario Hydro completed all of the planned emergency exercises at Bruce Heavy Water Plant in 1991. (Author)

  15. AECB staff annual assessment of the Bruce A Nuclear Generating Station for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Bruce Nuclear Generating Station A for 1996. Ontario Hydro operated Bruce A safely in 1996, maintaining the risk to workers and the public at an acceptably low level. Special safety system performance at Bruce A was adequate. Availability targets were all met. Improvement is needed to reduce the number of operating licence non-compliances

  16. Business health reporting process at Bruce Power helps drive successful plant performance

    International Nuclear Information System (INIS)

    Krane, J.C.

    2007-01-01

    Developing and implementing consistent and comprehensive measures of performance on a large multi-reactor unit nuclear power plant site is a significant challenge. Linking these performance measures back to licence compliance standards and all aspects of the operations, engineering, maintenance and support activities is needed to ensure cohesive site-wide safe operations and satisfy regulatory needs. At Bruce Power, Canada's largest independently-owned nuclear power producer, a Business Health reporting process has been developed to provide a standardized performance rating scheme. The reporting process ties all self assessment activities to common management principles and process structure areas that comprise the Bruce Power Management System. The principles used for performance ratings link directly back to the operating licenses and the primary referenced management system standard. The Business Health reporting process provides a natural business and regulatory oversight framework report that is easily understood and consistently measured over time. The rating data is derived from easily understood quantitative and qualitative descriptions that can be trended over time. The results derived from semi-annual Business Health reports provide an ongoing overall measure of Bruce Power's management system effectiveness for enabling and sustaining required business results and high standards of safety. (author)

  17. AECB staff review of Bruce NGS 'A' operation for the year 1989

    International Nuclear Information System (INIS)

    1990-06-01

    The operation of the Bruce Nuclear Generating Station 'B' is monitored and licensing requirements are enforced by the Atomic Energy Control Board (AECB). This report records the conclusions of the AECB staff assessment of Bruce NGS 'A' during 1989 and the early part of 1990. Overall operation of the station met acceptable safety standards. Despite numerous problems and technical difficulties encountered, station management and supervisory personnel acted with due caution and made decisions in the interests of safety. There was evidence of improvement in a number of key areas, supported by pertinent indicators in the objective measures table. The extensive inspection and maintenance programs carried out during the year revealed the extent of component deterioration due to aging to be larger than expected. Hydrogen embrittlement of pressure tubes, erosion/corrosion of steam and feed water valves, heat exchanger tubes and piping, fouling of boilers and heat exchangers, and environmental damage of electrical equipment are examples. Continued aging of plant equipment and its potential for reducing the margins for safe operation must be taken into account by Ontario Hydro in establishing priorities and target dates for completion of actions to resolve identified problems at Bruce NGS 'A'. (2 tabs.)

  18. Primary separator replacement for Bruce Unit 8 steam generators

    International Nuclear Information System (INIS)

    Roy, S.B.; Mewdell, C.G.; Schneider, W.G.

    2000-01-01

    During a scheduled maintenance outage of Bruce Unit 8 in 1998, it was discovered that the majority of the original primary steam separators were damaged in two steam generators. The Bruce B steam generators are equipped with GXP type primary cyclone separators of B and W supply. There were localized perforations in the upper part of the separators and large areas of generalized wall thinning. The degradation was indicative of a flow related erosion corrosion mechanism. Although the unit- restart was justified, it was obvious that corrective actions would be necessary because of the number of separators affected and the extent of the degradation. Repair was not considered to be a practical option and it was decided to replace the separators, as required, in Unit 8 steam generators during an advanced scheduled outage. GXP separators were selected for replacement to minimize the impact on steam generator operating characteristics and analysis. The material of construction was upgraded from the original carbon steel to stainless steel to maximize the assurance of full life. The replacement of the separators was a first of a kind operation not only for Ontario Power Generation and B and W but also for all CANDU plants. The paper describes the degradations observed and the assessments, the operating experience, manufacture and installation of the replacement separators. During routine inspection in 1998, many of the primary steam separators in two of steam generators at Bruce Nuclear Division B Unit 8 were observed to have through wall perforations. This paper describes assessment of this condition. It also discusses the manufacture and testing of replacement primary steam separators and the development and execution of the replacement separator installation program. (author)

  19. The operation and maintenance of the SLAR system at Bruce A

    Energy Technology Data Exchange (ETDEWEB)

    Ahuja, S [Ontario Hydro, Tiverton, ON (Canada). Bruce Nuclear Generating Station-A

    1997-12-31

    The SLAR (Spacer Location And Repositioning) system at Bruce A consists of two (2) Delivery Machines and a Fuelling Machine Trolley equipped with the D{sub 2}0 and Air auxiliary systems. The Delivery Machines are designed to perform all the Fuelling Machine operations and have the capability to rapidly defuel/refuel a reactor channel and traverse the SLAR tool to locate and reposition the spacers in the channel. The number of functions that a Delivery Machine must perform makes it more complex as compared to the operations of a Fuelling Machine. The paper discusses the operation of the SLAR Delivery Machines and the problems encountered with the operation and maintenance of this system at Bruce A. (author). 8 figs.

  20. Fuelling with flow at Bruce A

    Energy Technology Data Exchange (ETDEWEB)

    Gray, M G [Canadian General Electric Co. Ltd., Peterborough, ON (Canada)

    1997-12-31

    Fuelling with flow is the solution chosen by Bruce A to overcome the potential power pulse caused by a major inlet header failure. Fuelling with flow solves the problem by rearranging the core to place new fuel at the channel inlet and irradiated fuel at the channel outlet. The change has a significant impact on the Bruce A fuel handling system which was designed primarily to do on power fuelling in the against flow direction. Mechanical changes to the fuelling machine include a modification to the existing ram head and the replacement of standard fuel carriers with new fuelling with flow fuel carriers having the capability of opening the channel latch. Changes to the control system are more involved. A new set of operational sequences are required for both the upstream and downstream fuelling machines to achieve the fuel change. Steps based on sensitive ram push are added to reduce the risk of failing to close the latch at the correct position to properly support the fuel string. Changes are also required to the protective interlocks to allow fuelling with flow and reduce risk. A new fuel string supporting shield plug was designed and tested to reduce the risk of endplate cracking that could occur on the irradiated bundle that would have been supported directly by the channel latch. Some operational changes have been incorporated to accommodate this new shield plug. Considerable testing has been carried out on all aspects of fuel handling where fuelling with flow differs from the reference fuelling against flow. (author). 3 figs.

  1. Environmental health scoping study at Bruce Heavy Water Plant

    International Nuclear Information System (INIS)

    Prior, M.; Mostrom, M.; Coppock, R.; Florence, Z.

    1995-10-01

    There are concerns that hydrogen sulfide released from the Heavy Water Plant near Kincardine, Ontario may be the cause of the mortalities and morbidities observed in a nearby flock of sheep. The Philosopher's Wool sheep farm is about four kilometres south-southeast of the Bruce Heavy Water Plant. Ontario Hydro, the owner and operator of the Bruce Heavy Water Plant, claims that hydrogen sulphide emissions from the Bruce Heavy Water Plant are within regulatory limits and well below levels that cause harm. Accordingly, the Atomic Energy Control Board commissioned the Alberta Environmental Centre, Alberta Department of Environmental Protection, to develop a scoping study for this environmental health issue. The first objective was to describe a field investigation model to define clearly the environmental health and operation of the sheep farm. The second objective was to describe possible exposure patterns and develop a holistic environmental pathway model. If appropriate, the third study objective was to describe animal models of the actual situation to elucidate specific aspects of the environmental health concerns. It was not the objective of this report to provide a definitive answer to the present environmental health issue. Ontario Hydro provided data to the Alberta Environmental Centre, as di the sheep farmer, the attending veterinarian, the University of Guelph study team, and the Atomic Energy Control Board. A six-tiered strategy of sequential evaluations of the ovine health problem is based on the multiple-response paradigm. It assumes the observed ovine health results are the result of multiple effector events. Each tier constitutes a separate, but inter-related, study. Sequential evaluation and feedback of each tier allow sound scientific judgements and efficient use of resources. (author). 59 refs., 11 tabs., 22 figs

  2. Measurements of Sheath Temperature Profiles in Bruce LVRF Bundles Under Post-Dryout Heat Transfer Conditions in Freon

    International Nuclear Information System (INIS)

    Guo, Y.; Bullock, D.E.; Pioro, I.L.; Martin, J.

    2006-01-01

    An experimental program has been completed to study the behaviour of sheath wall temperatures in the Bruce Power Station Low Void Reactivity Fuel (shortened hereafter to Bruce LVRF) bundles under post-dryout (PDO) heat-transfer conditions. The experiment was conducted with an electrically heated simulator of a string of nine Bruce LVRF bundles, installed in the MR-3 Freon heat transfer loop at the Chalk River Laboratories (CRL), Atomic Energy of Canada Limited (AECL). The loop used Freon R-134a as a coolant to simulate typical flow conditions in CANDU R nuclear power stations. The simulator had an axially uniform heat flux profile. Two radial heat flux profiles were tested: a fresh Bruce LVRF profile and a fresh natural uranium (NU) profile. For a given set of flow conditions, the channel power was set above the critical power to achieve dryout, while heater-element wall temperatures were recorded at various overpower levels using sliding thermocouples. The maximum experimental overpower achieved was 64%. For the conditions tested, the results showed that initial dryout occurred at an inner-ring element at low flows and an outer-ring element facing internal subchannels at high flows. Dry-patches (regions of dryout) spread with increasing channel power; maximum wall temperatures were observed at the downstream end of the simulator, and immediately upstream of the mid-bundle spacer plane. In general, maximum wall temperatures were observed at the outer-ring elements facing the internal subchannels. The maximum water-equivalent temperature obtained in the test, at an overpower level of 64%, was significantly below the acceptable maximum temperature, indicating that the integrity of the Bruce LVRF will be maintained at PDO conditions. Therefore, the Bruce LVRF exhibits good PDO heat transfer performance. (authors)

  3. Bruce A units 1 and 2 restart project

    International Nuclear Information System (INIS)

    Routledge, K.

    2006-01-01

    This presentation provides an overview of the Bruce A Units 1 and 2 Restart project from the vantage point of the Project Management Contractor (PMC). The presentation will highlight the unique structure of the project, which has been designed to maximize project efficiencies while minimizing the impact to the Bruce Power operational reactors. Efficiency improvements covered in the presentation includes: support services provided to the direct work contractors, radiation protection, worker protection, engineering, field execution, maintenance and facilities. The presentation focusses on the roles of the PMC in helping to ensure the successful outcome of this ambitious reactor refurbishment project. In addition, the Construction Island concept that has been implemented on the project will be presented, with some of the innovative thinking that has gone into its creation. The organization of the PMC and an overview of the project schedule is also presented. AMEC NCL is a privately held consultancy in the Canadian nuclear industry which provides experienced and flexible multi-disciplined resources to support full project management, engineering solutions and safety consultancy services throughout the life cycle of nuclear facilities in Canada, and for customers in related markets in North America and overseas. AMEC NCL is a wholly-owned subsidiary of AMEC plc

  4. Cyber against punk: Greg Bear’s Queen of Angels as metamorphosed cyberpunk

    Directory of Open Access Journals (Sweden)

    M. F. Blatchford

    1994-05-01

    Full Text Available Recent American science fiction (which commercially dominates world science fiction incorporates two schools of thought, ‘cyberpunk' and ‘hard SF’. which may be read to embody, respectively, radical/liberal and patriotic/ conservative propaganda. This article, after attempting to define aspects of these schools, examines Queen of Angels by Greg Bear (who before producing that text had been a proponent of hard SF. This text is shown to have strong elements of cyberpunk (possibly, to judge by one critical review, appealing to a cyberpunk audience but to have transformed and inverted the radical and liberal themes of cyberpunk into conservative themes. The text thus illuminates philosophical and technical differences between the schools. It is suggested that the imagery of cyberpunk, and perhaps that of science fiction in general, is liable to such reversals of ideological significance.

  5. AECB staff annual assessment of the Bruce B Nuclear Generating Station for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    AECB staff believes Ontario Hydro operated Bruce B safely in 1994. The Bruce B reactors will remain limited to 88% full power until Ontario Hydro is able to demonstrate that it is safe to operate at higher powers. Ontario Hydro's compliance with AECB regulations and the Operating Licence was satisfactory. AECB found no major violations. The station performance was similar to previous years. Radiation doses to workers and the public were well below the legal limits and also remained below Ontario Hydro's internal targets. Worker radiation doses increased slightly but were comparable to previous years. Inspection of pressure tubes and steam generator tubes by Ontario Hydro showed continuing tube degradation. However, we believe that Ontario Hydro made progress in correcting and managing these problems. Ontario Hydro carried out a full-scale fire drill at Bruce B in 1994. AECB witnessed the drill and were pleased to observe a significant improvement in the station's fire-fighting capability. 7 tabs., 4 figs

  6. Integrated inspection programs at Bruce Heavy Water Plant

    Energy Technology Data Exchange (ETDEWEB)

    Brown, K C [Ontario Hydro, Tiverton, ON (Canada)

    1993-12-31

    Quality pressure boundary maintenance and an excellent loss prevention record at Bruce Heavy Water Plant are the results of the Material and Inspection Unit`s five inspection programs. Experienced inspectors are responsible for the integrity of the pressure boundary in their own operating area. Inspectors are part of the Technical Section, and along with unit engineering staff, they provide technical input before, during, and after the job. How these programs are completed, and the results achieved, are discussed. 5 figs., 1 appendix.

  7. Integrated inspection programs at Bruce Heavy Water Plant

    International Nuclear Information System (INIS)

    Brown, K.C.

    1992-01-01

    Quality pressure boundary maintenance and an excellent loss prevention record at Bruce Heavy Water Plant are the results of the Material and Inspection Unit's five inspection programs. Experienced inspectors are responsible for the integrity of the pressure boundary in their own operating area. Inspectors are part of the Technical Section, and along with unit engineering staff, they provide technical input before, during, and after the job. How these programs are completed, and the results achieved, are discussed. 5 figs., 1 appendix

  8. Structural and metamorphic evolution of the Mid-Late Proterozoic Rayner Complex, Cape Bruce, East Antarctica

    International Nuclear Information System (INIS)

    Dunkley, D.J.; Clarke, G.L.; White, R.W.

    2002-01-01

    Granulite to transitional granulite facies gneisses exposed at Cape Bruce, Rayner Complex, East Antarctica, record three main orogenic/magmatic phases: (1) intrusion of c. 1000-980 Ma felsic orthogneisses into Mid-Proterozoic metasediments, contemporary with the development of north-trending reclined to recumbent folds; (2) extensive c. 980-900 Ma felsic magmatism, including equivalents of the Mawson Charnockite, which accompanied the development of upright, east-northeast-trending folds; and (3) ultramylonite zones of uncertain age. The first two phases are known as the Rayner Structrual Episode, the effects of which are similar in rocks to the east of Cape Bruce, at Mawson, and in the northern Prince Charles Mountains. Archaean rocks immediately to the west of Cape Bruce were tectonically reworked during the Rayner Structural Episode. The first orogenic phase is inferred to represent the collision between a wedge-shaped Proterozoic block comprising rocks of the Mawson Coast and Eastern Ghats Province, with the Archaean Napier Complex. The second orogenic phase included a major period of crustal growth through emplacement of the Mawson Charnockite and equivalents. (author). 41 refs., 6 figs., 1 tab

  9. Performance of Bruce natural UO2 fuel irradiated to extended burnups

    International Nuclear Information System (INIS)

    Zhou, Y.N.; Floyd, M.R.; Ryz, M.A.

    1995-11-01

    Bruce-type bundles XY, AAH and GF were successfully irradiated in the NRU reactor at Chalk River Laboratories to outer-element burnups of 570-900 MWh/kgU. These bundles were of the Bruce Nuclear Generating Station (NGS)-A 'first-charge' design that contained gas plenums in the outer elements. The maximum outer-element linear powers were 33-37 kW/m. Post-irradiation examination of these bundles confirmed that all the elements were intact. Bundles XY and AAH, irradiated to outer-element burnups of 570-700 MWh/kgU, experienced low fission-gas release (FGR) ( 500 MWh/kgU (equivalent to bundle-average 450 MWh/kgU) when maximum outer-element linear powers are > 50 kW/m. The analysis in this paper suggests that CANDU 37-element fuel can be successfully irradiated (low-FGR/defect-free) to burnups of at least 700 MWh/kgU, provided maximum power do not exceed 40 kW/m. (author). 5 refs., 1 tab., 8 figs

  10. AECB staff review of Bruce NGS 'B' operation for the year 1989

    International Nuclear Information System (INIS)

    1990-06-01

    The operation of the Bruce Nuclear Generating Station 'B' is monitored and licensing requirements are enforced by the Atomic Energy Control Board (AECB), which observes operation of the reactors, conducts audits, witnesses important activities, reviews station documentation and reports, and issue approvals, where appropriate, in accordance with licence conditions. This report records the conclusions of the AECB staff assessment of Bruce NGS 'B' during 1989. In general, the station operated within acceptable safety standards. Quality improvement initiatives started in 1989 should lead to improved station maintenance and operation in coming years. Ontario Hydro still needs to improve the administration of operating memos, deficiency reports and call-ups. Station management must ensure that shift supervisors and reactor first operators operate the station in a conservative manner at all times and put safety interests first when responding to a unit upset. (2 tabs.)

  11. Design of the MiniSLAR system for Bruce A

    International Nuclear Information System (INIS)

    Gray, M.G.

    1995-01-01

    Cancellation of Bruce A Retube created the need to perform SLAR on Unit 1. The existing SLAR system cannot reach Unit 1 and alternative systems had limitations. The concept and design of MiniSLAR were driven by the availability of existing components made for Retube. The MiniSLAR concept was developed by a team with members representing operators, technicians, and designers from various departments within Ontario Hydro and GE Canada. Overall project leadership was provided by Bruce A Projects and Modifications Department with assistance from Ontario Hydro Nuclear Technology Services. The responsibility for detailed design was assigned by Ontario Hydro to GE Canada. The detailed design proceeded with continual input and review by the team. The MiniSLAR delivery machine consists of a closure removal ram, a shield plug removal ram and a SLAR tool delivery ram attached to the sliding plate of a horizontal indexing mechanism. The moving plate is constrained by guide rails to a fixed plate and seals against it with o-rings. A snout and clamping mechanism mounts on the front of the fixed plate. The machine mounts atop a work table which provides the various motions required for endfitting engagement. Some operations are performed manually while others are remote and automatic. (author)

  12. An appreciation of Bruce and Young's (1986) serial stage model of face naming after 25 years.

    Science.gov (United States)

    Hanley, J Richard

    2011-11-01

    The current status of Bruce and Young's (1986) serial model of face naming is discussed 25 years after its original publication. In the first part of the paper, evidence for and against the serial model is reviewed. It is argued that there is no compelling reason why we should abandon Bruce and Young's claim that recall of a name is contingent upon prior retrieval of semantic information about the person. The current status of the claim that people's names are more difficult to recall than the names of objects is then evaluated. Finally, an account of the anatomical location in the brain of Bruce and Young's three processing stages (face familiarity, retrieval of semantic information, retrieval of names) is suggested. In particular, there is evidence that biographical knowledge about familiar people is stored in the right anterior temporal lobes (ATL) and that the left temporal pole (TP) is heavily involved in retrieval of the names of familiar people. The issue of whether these brain areas play a similar role in object processing is also discussed. ©2011 The British Psychological Society.

  13. Flux distribution measurements in the Bruce A unit 1 reactor

    International Nuclear Information System (INIS)

    Okazaki, A.; Kettner, D.A.; Mohindra, V.K.

    1977-07-01

    Flux distribution measurements were made by copper wire activation during low power commissioning of the unit 1 reactor of the Bruce A generating station. The distribution was measured along one diameter near the axial and horizontal midplanes of the reactor core. The activity distribution along the copper wire was measured by wire scanners with NaI detectors. The experiments were made for five configurations of reactivity control mechanisms. (author)

  14. Review of Bruce A reactor regulating system software

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    Each of the four reactor units at the Ontario Hydro Bruce A Nuclear Generating Station is controlled by the Reactor Regulating System (RRS) software running on digital computers. This research report presents an assessment of the quality and reliability of the RRS software based on a review of the RRS design documentation, an analysis of certain significant Event Reports (SERs), and an examination of selected software changes. We found that the RRS software requirements (i.e., what the software should do) were never clearly documented, and that design documents, which should describe how the requirements are implemented, are incomplete and inaccurate. Some RRS-related SERs (i.e., reports on unexpected incidents relating to the reactor control) implied that there were faults in the RRS, or that RRS changes should be made to help prevent certain unexpected events. The follow-up investigations were generally poorly documented, and so it could not usually be determined that problems were properly resolved. The Bruce A software change control procedures require improvement. For the software changes examined, there was insufficient evidence provided by Ontario Hydro that the required procedures regarding change approval, independent review, documentation updates, and testing were followed. Ontario Hydro relies on the expertise of their technical staff to modify the RRS software correctly; they have confidence in the software code itself, even if the documentation is not up-to-date. Ontario Hydro did not produce the documentation required for an independent formal assessment of the reliability of the RRS. (author). 37 refs., 3 figs.

  15. Review of Bruce A reactor regulating system software

    International Nuclear Information System (INIS)

    1995-12-01

    Each of the four reactor units at the Ontario Hydro Bruce A Nuclear Generating Station is controlled by the Reactor Regulating System (RRS) software running on digital computers. This research report presents an assessment of the quality and reliability of the RRS software based on a review of the RRS design documentation, an analysis of certain significant Event Reports (SERs), and an examination of selected software changes. We found that the RRS software requirements (i.e., what the software should do) were never clearly documented, and that design documents, which should describe how the requirements are implemented, are incomplete and inaccurate. Some RRS-related SERs (i.e., reports on unexpected incidents relating to the reactor control) implied that there were faults in the RRS, or that RRS changes should be made to help prevent certain unexpected events. The follow-up investigations were generally poorly documented, and so it could not usually be determined that problems were properly resolved. The Bruce A software change control procedures require improvement. For the software changes examined, there was insufficient evidence provided by Ontario Hydro that the required procedures regarding change approval, independent review, documentation updates, and testing were followed. Ontario Hydro relies on the expertise of their technical staff to modify the RRS software correctly; they have confidence in the software code itself, even if the documentation is not up-to-date. Ontario Hydro did not produce the documentation required for an independent formal assessment of the reliability of the RRS. (author). 37 refs., 3 figs

  16. U.S. Army Medical Research Institute of Infectious Diseases Annual Report, Fiscal Year 1986

    Science.gov (United States)

    1986-10-01

    determined. SUMMARY Strains of mice sensitive (A/J) and resistant (C3H/HeN) to C. burnetii were given varying doses of the phase 1, 9 Mile isolate...ASSOCIATE INVESTIGATORS: J. W. Ezzell , Ph.D. B. E. Ivins, Ph.D. As previously reported by Dr. Ezzell , a 93-kd extractable protein (EAI) is the principal...challenge. The following work has been carried out by Dr. Bruce Ivins in cooperation with Susan Welkos, Steve Little, John Ezzell , and Greg Knudson of

  17. Estimating the number of latent cracks in pressure tube joints at Bruce unit 2

    International Nuclear Information System (INIS)

    Schwarz, C.J.

    1983-10-01

    A model was built to estimate the number of hydride cracks which might have arisen in the rolled joints of Bruce unit 2 prior to the stress relieving operation. The model estimated that about 100 such cracks might exist. Since this estimate is based on experiments that were thermally cycled and since cycling did not occur in Bruce, prior to stress relieving the actual number is expected to be substantially lower. A sensitivity analysis of the model showed that it is sensitive to the assumptions of stress levels, probability of initiation and distribution of initiation time. A better estimate could be made if more data were available on these parameters under realistic conditions. Therefore, the recommendation is made to collect more information about these factors under realistic conditions

  18. Exercise capacity in Dutch children : New reference values for the Bruce treadmill protocol

    NARCIS (Netherlands)

    M.H.M. van der Cammen-van Zijp (Monique); H.J.G. van den Berg-Emons (Rita); S.P. Willemsen (Sten); H.J. Stam (Henk); D. Tibboel (Dick); H. IJsselstijn (Hanneke)

    2010-01-01

    textabstractThe Bruce treadmill protocol is suitable for children 4 years of age and older. Dutch reference values were established in 1987. We considered that children's exercise capacity has deteriorated due to changes in physical activity patterns and eating habits. We determined new reference

  19. AECB staff annual report of Bruce A NGS for the year 1991

    International Nuclear Information System (INIS)

    1992-11-01

    In this report on Bruce A operations during 1991, AECB staff itemizes non-compliances with the operating licence. Non of the violations that occurred at Bruce A resulted in any significant threat to public safety or well-being. There were no exposures of workers to radiation in excess of the regulatory requirements; however, there have been instances of uncontrolled contaminated areas and spread of contamination in the station. Releases of radioactive material to the environment were much below target. The performance of the four special safety systems has been good, with the exception of shutdown system number two on Unit 3. A review of significant event reports and their causes has revealed an apparent lack of a system by which operations and maintenance work is verified as having been carried out correctly. There is a large backlog of maintenance work. Initiatives have been taken to correct this problem. Two important safety issues are discussed in detail. These are the chronic problem of leaking boiler tubes, and the potentially serious problem of fret marks on pressure tubes caused by abnormal fuel support. (Author)

  20. Impact of bundle deformation on CHF: ASSERT-PV assessment of extended burnup Bruce B bundle G85159W

    International Nuclear Information System (INIS)

    Rao, Y.F.; Manzer, A.M.

    2005-01-01

    This paper presents a subchannel thermalhydraulic analysis of the effect on critical heat flux (CHF) of bundle deformation such as element bow and diametral creep. The bundle geometry is based on the post-irradiation examination (PIE) data of a single bundle from the Bruce B Nuclear Generating Station, Bruce B bundle G85159W, which was irradiated for more than two years in the core during reactor commissioning. The subchannel code ASSERT-PV IST is used to assess changes in CHF and dryout power due to bundle deformation, compared to the reference, undeformed bundle. (author)

  1. Bruce Unit 2 lay-up engineering assessment

    International Nuclear Information System (INIS)

    Iley, D.

    1995-01-01

    The overall lay-up program initiated as a result of the strategic decision to shut down Bruce A unit 2 is briefly described as an introduction to the engineering assessment of the unit 2 systems. The assessment has identified the need to prepare 67 system and 9 equipment lay-up specifications. A summary of the selected system specifications is described. A complete summary and the specifications and the status of unit 2 systems and equipment required to support lay-up and/or the other three operating units is available on request due to the volume of the information. Some logistical details of the lay-up implementation plans, results, and problems to date demonstrate the complexity of the lay-up requirements for a nuclear unit in a multi-unit CANDU station. (author)

  2. Regional and site geological frameworks : proposed Deep Geologic Repository, Bruce County, Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Raven, K.; Sterling, S.; Gaines, S.; Wigston, A. [Intera Engineering Ltd., Ottawa, ON (Canada); Frizzell, R. [Nuclear Waste Management Organization, Toronto, ON (Canada)

    2009-07-01

    The Nuclear Waste Management Organization is conducting geoscientific studies on behalf of Ontario Power Generation into the proposed development of a Deep Geologic Repository (DGR) for low and intermediate level radioactive waste (L and ILW) at the Bruce site, near Tiverton, Ontario. This paper presented a regional geological framework for the site that was based on a review of regional drilling; structural geology; paleozoic stratigraphy and sedimentology; a 3D geological framework model; a DGR geological site characterization model; bedrock stratigraphy and marker beds; natural fracture frequency data; and formation predictability. The studies have shown that the depth, thickness, orientation and rock quality of the 34 rock formations, members or units that comprise the 840 m thick Paleozoic bedrock sequence at the Bruce site are very uniform and predictable over distances of several kilometres. The proposed DGR will be constructed as an engineered facility comprising a series of underground emplacement rooms at a depth of 680 metres below ground within argillaceous limestones. The geoscientific studies are meant to provide a basis for the development of descriptive geological, hydrogeological and geomechanical models of the DGR site that will facilitate environmental and safety assessments. 11 refs., 3 tabs., 9 figs.

  3. Experience of oil in CANDU moderator during A831 planned outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, G.; Nashiem, R.; Matheson, S.; Stuart, C.; Roberts, J.G.

    2011-01-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  4. Experience of oil in CANDU® moderator during A831 planned outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, G.; Nashiem, R.; Matheson, S.; Stuart, C.; Roberts, J.G.

    2010-01-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU® reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  5. Experience of oil in CANDU® moderator during A831 planned outage at Bruce Power

    Energy Technology Data Exchange (ETDEWEB)

    Ma, G.; Nashiem, R.; Matheson, S. [Bruce Power, Tiverton, Ontario (Canada); Stuart, C. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Roberts, J.G. [CANTECH Associates Ltd., Burlington, Ontario (Canada)

    2010-07-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU® reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  6. Experience of oil in CANDU moderator during A831 planned outage at Bruce Power

    Energy Technology Data Exchange (ETDEWEB)

    Ma, G.; Nashiem, R.; Matheson, S. [Bruce Power, Tiverton, Ontario (Canada); Stuart, C. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Roberts, J.G. [CANTECH Associates Ltd., Burlington, Ontario (Canada)

    2011-03-15

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  7. Kuldlõvid Louise Bourgeois'le, Bruce Naumanile ja Itaalia paviljonile / Reet Varblane

    Index Scriptorium Estoniae

    Varblane, Reet, 1952-

    1999-01-01

    Veneetsia 48. rahvusvahelise kunstibiennaali preemiasaajad, premeeritud tööd, korralduskomitee ja žürii koosseis. Kuldlõvid: Louise Bourgeois, Bruce Nauman, Itaalia paviljon (Monica Bonvicini, Bruna Esposito, Luisa Lambri, Paola Pivi, Grazia Toderi ühisprojekt); kolm rahvusvahelist preemiat: Doug Aitken, Cai Gou-Qiang, Shirin Neshat; žürii tõstis esile: Georges Abeagbo, Eija-Liisa Ahtila, Katarzyna Kozura ? (Kozyra), Lee Bul; UNESCO preemia: Ghada Amer

  8. Fuel bundle to pressure tube fretting in Bruce and Darlington

    Energy Technology Data Exchange (ETDEWEB)

    Norsworthy, A G; Ditschun, A [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    As the fuel channel elongates due to creep, the fuel string moves relative to the inlet until the fuel pads at the inboard end eventually separate from the spacer sleeve, and the fuel resides on the burnish mark of the pressure tube. The bundle is then supported in a fashion which contributes to increased levels of vibration. Those pads which (due to geometric variation) have contact loads with the pressure tube within a certain range, vibrate, and cause significant fretting on the burnish mark, and further along at the midplane of the bundle. Inspection of the pressure tubes in Bruce A, Bruce B, and Darlington has revealed fret damage up to 0.55 mm at the burnish mark and slightly lower than this at the inlet bundle midplane. To date, all fret marks have been dealt with successfully without the need for tube replacement, but a program of work has been initiated to understand the mechanism and reduce the fretting. Such understanding is necessary to guide future design changes to the fuel bundle, to guide future inspection programs, to guide maintenance programs, and for longer term strategic planning. This paper discusses how the understanding of fretting has evolved and outlines a current hypothesis for the mechanism of fretting. The role of bundle geometry, excitation forces, and reactor conditions are reviewed, along with options under consideration to mitigate damage. (author). 4 refs., 2 tabs., 13 figs.

  9. Fuel bundle to pressure tube fretting in Bruce and Darlington

    International Nuclear Information System (INIS)

    Norsworthy, A.G.; Ditschun, A.

    1995-01-01

    As the fuel channel elongates due to creep, the fuel string moves relative to the inlet until the fuel pads at the inboard end eventually separate from the spacer sleeve, and the fuel resides on the burnish mark of the pressure tube. The bundle is then supported in a fashion which contributes to increased levels of vibration. Those pads which (due to geometric variation) have contact loads with the pressure tube within a certain range, vibrate, and cause significant fretting on the burnish mark, and further along at the midplane of the bundle. Inspection of the pressure tubes in Bruce A, Bruce B, and Darlington has revealed fret damage up to 0.55 mm at the burnish mark and slightly lower than this at the inlet bundle midplane. To date, all fret marks have been dealt with successfully without the need for tube replacement, but a program of work has been initiated to understand the mechanism and reduce the fretting. Such understanding is necessary to guide future design changes to the fuel bundle, to guide future inspection programs, to guide maintenance programs, and for longer term strategic planning. This paper discusses how the understanding of fretting has evolved and outlines a current hypothesis for the mechanism of fretting. The role of bundle geometry, excitation forces, and reactor conditions are reviewed, along with options under consideration to mitigate damage. (author). 4 refs., 2 tabs., 13 figs

  10. After reliability centred maintenance. Preventive maintenance living program implementation at Bruce Power

    International Nuclear Information System (INIS)

    Harazim, Michael L.; Ferguson, Brian J.

    2003-01-01

    Industrial preventive maintenance (PM) programs represent a large part of plant O and M costs. PM Optimization (PMO) projects represent an effective mechanism for identifying unnecessary PM, extending PM intervals and infusing predictive maintenance (PdM) methods. However, once optimized, what process prevents the PM program from returning to a state of disarray? This is the function of a PM living program (PMLP). In 1997, an independent performance assessment identified concerns with the applicability and effectiveness of all Ontario Power Generation, Inc. (OPGI) PM programs. In response, OPGI instituted an Integrated Maintenance Program (IMP) including Reliability Centred Maintenance (RCM) and a PMLP. It should be noted that the PMLP was developed for the 3 OPGI nuclear Sites (i.e. Bruce, Pickering, and Darlington). Effective 1 May 2001, the Bruce Site has been leased to a group of investors lead by British Energy. This paper is written in historical context and therefore refers to the Bruce Site as part of OPGI. The PMLP is made up of five elements: 1) process control, 2) change control, 3) worker feedback, 4) program performance metrics, and 5) deferral module. A PMLP software tool, originally applied to Duke Energy nuclear plants, was enhanced and customized specifically for the OPGI PMLP, and then implemented at all three of OPGI's nuclear sites. The objective of the OPGI PMLP was to: Provide processes/procedures for continual optimization of all site PM tasks, Ensure effective and timely revision of PM tasks in the work management system, Ensure PM tasks remain applicable/effective at all times, Maintain and enhance PM consistency on a component, system and Site basis, Ensure that new predictive maintenance techniques are applied and integrated with the PM program, Ensure that mandated PM tasks are identified and executed, Provide a mechanism for craft feedback, Meet regulatory requirements for PM program effectiveness, and Provide PM task deferral

  11. Review of the reliability of Bruce 'B' RRS dual computer system

    International Nuclear Information System (INIS)

    Arsenault, J.E.; Manship, R.A.; Levan, D.G.

    1995-07-01

    The review presents an analysis of the Bruce 'B' Reactor Regulating System (RRS) Digital Control Computer (DCC) system, based on system documentation, significant event reports (SERs), question sets, and a site visit. The intent is to evaluate the reliability of the RRS DCC and to identify the possible scenarios that could lead to a serious process failure. The evaluation is based on three relatively independent analyses, which are integrated and presented in the form of Conclusions and Recommendations

  12. Power raise through improved reactor inlet header temperature measurement at Bruce A Nuclear Generation Station

    International Nuclear Information System (INIS)

    Basu, S.; Bruggemn, D.

    1997-01-01

    Reactor Inlet Header (RIH) temperature has become a factor limiting the performance of the Ontario Hydro Bruce A units. Specifically, the RIH temperature is one of several parameters that is preventing the Bruce A units from returning to 94% power operation. RIH temperature is one of several parameters which affect the critical heat flux in the reactor channel, and hence the integrity of the fuel. Ideally, RIH temperature should be lowered, but this cannot be done without improving the heat transfer performance of the boilers and feedwater pre-heaters. Unfortunately, the physical performance of the boilers and pre-heaters has decayed and continues to decay over time and as a result the RIH temperature has been rising and approaching its defined limit. With an understanding of the current RIH temperature measurement loop and methods available to improve it, a solution to reduce the measurement uncertainty is presented

  13. Chemistry control at Bruce NGS 'B' from constructed to commercial operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    1987-01-01

    Pre-operational storage chemistry and flushing of the secondary side is described. The approach devised for Bruce NGS 'B' Unit 6 was unique for an Ontario Hydro Nuclear Unit. The significance of the improved Construction installation and Quality Assurance procedures, combined with those of Operations is identified. Secondary side chemistry during both commissioning and later operation is reported. It will be shown that the application of ALARA (As Low As is Reasonably Achievable) concept has resulted in tighter chemical specifications being met

  14. R. Bruce Merrifield and Solid-Phase Peptide Synthesis: A Historical Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, A R

    2007-12-04

    Bruce Merrifield, trained as a biochemist, had to address three major challenges related to the development and acceptance of solid-phase peptide synthesis (SPPS). The challenges were (1) to reduce the concept of peptide synthesis on a insoluble support to practice, (2) overcome the resistance of synthetic chemists to this novel approach, and (3) establish that a biochemist had the scientific credentials to effect the proposed revolutionary change in chemical synthesis. How these challenges were met is discussed in this article.

  15. Steam generator leak detection at Bruce A Unit 1

    International Nuclear Information System (INIS)

    Maynard, K.J.; McInnes, D.E.; Singh, V.P.

    1997-01-01

    A new steam generator leak detection system was recently developed and utilized at Bruce A. The equipment is based on standard helium leak detection, with the addition of moisture detection and several other capability improvements. All but 1% of the Unit 1 Boiler 03 tubesheet was inspected, using a sniffer probe which inspected tubes seven at a time and followed by individual tube inspections. The leak search period was completed in approximately 24 hours, following a prerequisite period of several days. No helium leak indications were found anywhere on the boiler. A single water leak indication was found, which was subsequently confirmed as a through-wall defect by eddy current inspection. (author)

  16. Fighting with Reality: Considering Mark Johnson's Pragmatic Realism through Bruce Lee's Jeet Kune Do Method

    Science.gov (United States)

    Miller, Alexander David

    2015-01-01

    This dissertation considers the supportive and complementary relation between Mark Johnson's embodied realism and Bruce Lee's Jeet Kune Do as a philosophical practice. In exploring this relationship, the emphasis on one's embodiment condition and its relationship with metaphor and self-expression are the primary focus. First, this work involves…

  17. Steam generator cleaning campaigns at Bruce A: 1993-1996

    International Nuclear Information System (INIS)

    Puzzuoli, F.V.; Leinonen, P.J.; Lowe, G.A.

    1997-01-01

    Boiler chemical cleaning (BOCC) and high-pressure water lancing operations were performed during the Bruce A 1993 Unit 3, 1994 Unit 3, 1995 Unit 1 and 1996 Unit 3 outages to remove secondary side deposits. High-pressure water lancing focused on three boiler areas: tube support plates, to remove broached hole deposits, hot leg U-bend supports to dislodge deposits contributing to boiler tube stress corrosion cracking and tube sheets with the aim of removing accumulated sludge piles and post BOCC insoluble residues. The chemical cleaning processes applied were modified versions of the one developed by the Electric Power Research Institute/Steam Generator Owners Group. During these BOCC operations, corrosion for several key boiler materials was monitored and was well below the specified allowances

  18. Uncertainties in gas dispersion at the Bruce heavy water plant

    International Nuclear Information System (INIS)

    Alp, E.; Ciccone, A.

    1995-07-01

    There have been concerns regarding the uncertainties in atmospheric dispersion of gases released from the Bruce Heavy Water Plant (BHWP). The concern arises due to the toxic nature of H 2 S, and its combustion product SO 2 . In this study, factors that contribute to the uncertainties, such as the effect of the shoreline setting, the potentially heavy gas nature of H 2 S releases, and concentration fluctuations, have been investigated. The basic physics of each of these issues has been described along with fundamental modelling principles. Recommendations have been provided on available computer models that would be suitable for modelling gas dispersion in the vicinity of the BHWP. (author). 96 refs., 4 tabs., 25 figs

  19. Bruce unit 1 moderator to end shield cooling leak repairs

    Energy Technology Data Exchange (ETDEWEB)

    Boucher, P; Ashton, A [Ontario Hydro, Tiverton, ON (Canada). Bruce Nuclear Generating Station-A

    1996-12-31

    In October 1994, a leak developed between the heavy water Moderator System and the light water End Shield Cooling System at Ontario Hydro`s Bruce A Generating Station Unit 1. The interface between these two systems consists of numerous reactor components all within the reactor vessel. This paper describes the initial discovery and determination of the leak source. The techniques used to pinpoint the leak location are described. The repair strategies and details are outlined. Flushing and refilling of the Moderator system are discussed. The current status of the Unit 1 End Shield Cooling System is given with possible remedial measures for clean-up. Recommendations and observations are provided for future references. (author). 7 figs.

  20. Uncertainties in gas dispersion at the Bruce heavy water plant

    Energy Technology Data Exchange (ETDEWEB)

    Alp, E; Ciccone, A [Concord Environmental Corp., Downsview, ON (Canada)

    1995-07-01

    There have been concerns regarding the uncertainties in atmospheric dispersion of gases released from the Bruce Heavy Water Plant (BHWP). The concern arises due to the toxic nature of H{sub 2}S, and its combustion product SO{sub 2}. In this study, factors that contribute to the uncertainties, such as the effect of the shoreline setting, the potentially heavy gas nature of H{sub 2}S releases, and concentration fluctuations, have been investigated. The basic physics of each of these issues has been described along with fundamental modelling principles. Recommendations have been provided on available computer models that would be suitable for modelling gas dispersion in the vicinity of the BHWP. (author). 96 refs., 4 tabs., 25 figs.

  1. Coffee Cups, Canoes, Airplanes and the Lived Experience: Reflections on the Works of Bertram (Chip) Bruce

    Science.gov (United States)

    Haythornthwaite, Caroline

    2014-01-01

    A career spent in research, teaching, and engagement with community entails a lifetime of assemblage of meaning from people, resources, technologies and experience. In his work, Bertram (Chip) Bruce has long engaged with how we create such an assemblage of meaning from our formal and found learning, and from the "lived experience" of…

  2. Development of restriction enzyme analyses to distinguish winter moth from bruce spanworm and hybrids between them

    Science.gov (United States)

    Marinko Sremac; Joseph Elkinton; Adam. Porter

    2011-01-01

    Elkinton et. al. recently completed a survey of northeastern North America for the newly invasive winter moth, Operophtera brumata L. The survey used traps baited with the winter moth pheromone, which consists of a single compound also used by Bruce spanworm, O. bruceata (Hulst), the North American congener of winter moth. Our...

  3. Adapting Scott and Bruce's General Decision-Making Style Inventory to Patient Decision Making in Provider Choice.

    Science.gov (United States)

    Fischer, Sophia; Soyez, Katja; Gurtner, Sebastian

    2015-05-01

    Research testing the concept of decision-making styles in specific contexts such as health care-related choices is missing. Therefore, we examine the contextuality of Scott and Bruce's (1995) General Decision-Making Style Inventory with respect to patient choice situations. Scott and Bruce's scale was adapted for use as a patient decision-making style inventory. In total, 388 German patients who underwent elective joint surgery responded to a questionnaire about their provider choice. Confirmatory factor analyses within 2 independent samples assessed factorial structure, reliability, and validity of the scale. The final 4-dimensional, 13-item patient decision-making style inventory showed satisfactory psychometric properties. Data analyses supported reliability and construct validity. Besides the intuitive, dependent, and avoidant style, a new subdimension, called "comparative" decision-making style, emerged that originated from the rational dimension of the general model. This research provides evidence for the contextuality of decision-making style to specific choice situations. Using a limited set of indicators, this report proposes the patient decision-making style inventory as valid and feasible tool to assess patients' decision propensities. © The Author(s) 2015.

  4. Expected changes in competency assurance at Bruce Power over next decade

    Energy Technology Data Exchange (ETDEWEB)

    Horton, C., E-mail: chip.horton@brucepower.com [Bruce Power, Tiverton, Ontario (Canada)

    2013-07-01

    There will be ten expected changes in competency assurance at Bruce Power over next decade. These changes are: outage worker supplemental staff change; entry level power worker union staff; self-paced process & software training; electronic confirmation of qualifications; JIT built into processes for low frequency tasks; more terminal objective back to fundamentals vs fundamentals build to terminal objective instructional design; more learning by practice / doing in a safe environment; SAT emphasis move from analysis, design & development to evaluation & maintenance of task lists (clearly tied to working rights); more formal tacit knowledge capture programs, systematic movement of knowledge from tacit to explicit; more breadth & depth training driven by demographic changes.

  5. Expected changes in competency assurance at Bruce Power over next decade

    International Nuclear Information System (INIS)

    Horton, C.

    2013-01-01

    There will be ten expected changes in competency assurance at Bruce Power over next decade. These changes are: outage worker supplemental staff change; entry level power worker union staff; self-paced process & software training; electronic confirmation of qualifications; JIT built into processes for low frequency tasks; more terminal objective back to fundamentals vs fundamentals build to terminal objective instructional design; more learning by practice / doing in a safe environment; SAT emphasis move from analysis, design & development to evaluation & maintenance of task lists (clearly tied to working rights); more formal tacit knowledge capture programs, systematic movement of knowledge from tacit to explicit; more breadth & depth training driven by demographic changes.

  6. Development and implementation of the heavy water program at Bruce Power

    International Nuclear Information System (INIS)

    Davloor, R.; Bourassa, C.

    2014-01-01

    Bruce Power operates 8 pressurized heavy water reactor units requiring more than 6000 mega grams (Mg) of heavy water. A Heavy Water Management Program that has been developed to administer this asset over the past 3 years. Through a corporate management system the Program provides governance, oversight and support to the stations. It is implemented through organizational structure, program and procedure documents and an information management system that provides benchmarked metrics, business intelligence and analytics for decision making and prediction. The program drives initiatives such as major maintenance activities, capital programs, detritiation strategies and ensures heavy water systems readiness for outages and rehabilitation of units. (author)

  7. Development and implementation of the heavy water program at Bruce Power

    Energy Technology Data Exchange (ETDEWEB)

    Davloor, R.; Bourassa, C., E-mail: ram.davloor@brucepower.com, E-mail: carl.bourassa@brucepower.com [Bruce Power, Tiverton, ON (Canada)

    2014-07-01

    Bruce Power operates 8 pressurized heavy water reactor units requiring more than 6000 mega grams (Mg) of heavy water. A Heavy Water Management Program that has been developed to administer this asset over the past 3 years. Through a corporate management system the Program provides governance, oversight and support to the stations. It is implemented through organizational structure, program and procedure documents and an information management system that provides benchmarked metrics, business intelligence and analytics for decision making and prediction. The program drives initiatives such as major maintenance activities, capital programs, detritiation strategies and ensures heavy water systems readiness for outages and rehabilitation of units. (author)

  8. Nuclear process steam for industry: potential for the development of an Industrial Energy Park adjacent to the Bruce Nuclear Power Development

    Energy Technology Data Exchange (ETDEWEB)

    Seddon, W A

    1981-11-01

    This report summarizes the results of an industrial survey jointly funded by the Bruce County Council, the Ontario Energy Corporation, Atomic Energy of Canada Limited and conducted with the cooperation of Ontario Hydro and the Ontario Ministry of Industry and Tourism. The objective of the study was to identify and assess the future needs and interest of energy-intensive industries in the concept of an Industrial Energy Park adjacent tof the Bruce Nuclear Power Development. The proposed Energy Park would capitalize on the infrastructure of the existing CANDU reactors and Ontario Hydro's proven and unique capability to produce steam, as well as electricity, at a cost currently about half that from a comparable coal-fired station.

  9. Hourly and seasonable variation in catch of winter moths and bruce spanworm in pheromone-baited traps

    Science.gov (United States)

    Joseph Elkinton; Natalie Leva; George Boettner; Roy Hunkins; Marinko. Sremac

    2011-01-01

    Elkinton et al. recently completed a survey of northeastern North America for the newly invasive winter moth, Operophtera brumata L. The survey used traps baited with the winter moth pheromone, which, as far as it is known, consists of a single compound that is also used by Bruce spanworm, the North American congener of winter moth, O....

  10. Two new species of the stenopodidean shrimp genus Spongiocaris Bruce & Baba, 1973 (Crustacea: Decapoda: Spongicolidae) from the Indo-West Pacific.

    Science.gov (United States)

    Komai, Tomoyuki; Grave, Sammy De; Saito, Tomomi

    2016-05-17

    Two new species of the deep-water spongicolid genus Spongiocaris Bruce & Baba, 1973, are described and illustrated from two localities in the Indo-West Pacific. Spongiocaris panglao n. sp. is described on the basis of material from the Bohol Sea, the Philippines, at depths of 220-731 m. Spongiocaris tuerkayi n. sp. is described on the basis of material from Atlantis Bank in the southwestern Indian Ocean at depths of 743-1053 m. Among eight known congeners, both new species appear close to S. semiteres Bruce & Baba, 1973, differing in the rostral length and armature, shape of the carapace, telsonal armature, development of the grooming apparatus of the first pereopod and shape of the third pereopod chela. An identification key to the species currently assigned to Spongiocaris is presented.

  11. Fuel string supporting shield plug (f3sp) for Ontario Hydro - Bruce NGSA

    Energy Technology Data Exchange (ETDEWEB)

    Henry, P T [Canadian General Electric Co. Ltd., Peterborough, ON (Canada)

    1997-12-31

    A reactor `power pulse` problem was identified for the Ontario Hydro Bruce generating stations. On a postulated inlet header break, the fuel strings in a large number of channels could relocate toward the upstream end, resulting in a power pulse. The solution adopted for Bruce GSA is to change the direction of fuelling, from against the flow, to fuelling with the flow. In this revised fuelling scheme, given a postulated inlet header failure, the fuel bundle with the highest burnup would relocate into the reactor core and introduce a negative reactivity during the accident. However, this fuelling configuration results in a highly irradiated fuel bundle residing in the most downstream position against the latch. The latch supports only the outer ring of elements, not the end plate. A resulting high stress on the end plate coupled with high levels of hydrogen and deuterium may result in Zr hydride assisted cracking in the end plate during hot shutdown conditions. (In fuelling against flow, this is not a problem, since the latch supported bundle is not irradiated and has only low levels of hydrogen and deuterium.) A fuel string supporting shield plug (f3sp) which supports the bundle end plate has been developed as a solution to the fuel bundle end plate cracking problem. It would replace the existing outlet shield plug in all channels. This paper will describe the f3sp design, associated fuel handling, operation and qualification for reactor use. (author). 8 figs.

  12. Fuel string supporting shield plug (f3sp) for Ontario Hydro - Bruce NGSA

    International Nuclear Information System (INIS)

    Henry, P.T.

    1996-01-01

    A reactor 'power pulse' problem was identified for the Ontario Hydro Bruce generating stations. On a postulated inlet header break, the fuel strings in a large number of channels could relocate toward the upstream end, resulting in a power pulse. The solution adopted for Bruce GSA is to change the direction of fuelling, from against the flow, to fuelling with the flow. In this revised fuelling scheme, given a postulated inlet header failure, the fuel bundle with the highest burnup would relocate into the reactor core and introduce a negative reactivity during the accident. However, this fuelling configuration results in a highly irradiated fuel bundle residing in the most downstream position against the latch. The latch supports only the outer ring of elements, not the end plate. A resulting high stress on the end plate coupled with high levels of hydrogen and deuterium may result in Zr hydride assisted cracking in the end plate during hot shutdown conditions. (In fuelling against flow, this is not a problem, since the latch supported bundle is not irradiated and has only low levels of hydrogen and deuterium.) A fuel string supporting shield plug (f3sp) which supports the bundle end plate has been developed as a solution to the fuel bundle end plate cracking problem. It would replace the existing outlet shield plug in all channels. This paper will describe the f3sp design, associated fuel handling, operation and qualification for reactor use. (author). 8 figs

  13. Restoration to serviceability of Bruce 'A' heat transfer equipment

    International Nuclear Information System (INIS)

    Gammage, D.; Machowski, C.; McGillivray, R.; Durance, D.; Kazimer, D.; Werner, K.

    2009-01-01

    Bruce Units 1 to 4 were shut down during the 1990s by the former Ontario Hydro, due in part to a long list of system and equipment deficiencies and concerns, including steam generator tube degradation as a consequence of the then-existing steam generator secondary side water chemistry conditions. Upon its creation in 2001, and following a program of condition assessment, Bruce Power was able to determine that Units 3 and 4 could return to service; but that Units 1 and 2 would require refurbishment. That Refurbishment Program, which is currently well advanced, included the re-assessment of the condition of equipment throughout the plant including the heat transfer equipment; and determination item-by-item as to what inspection, cleaning, repair, or even replacement would be required to put the equipment into a condition where it could be expected to operate reliably for the additional 30 years expected from the plant. Clearly the objective is to suitably restore the equipment to serviceability without doing more refurbishment work than is warranted - without replacing equipment except where absolutely necessary. The first task in such a program is determination of its scope - i.e. a listing of all heat exchangers. That list included everything from the steam generators (which required replacement, now completed), to much smaller heat exchangers in the heavy water upgrader systems (which were found to be in very good overall condition). There is also a very large number of other so-called 'balance-of-plant' heat exchangers; these include the maintenance coolers, moderator heat exchangers, shutdown coolers and a whole raft of smaller coolers - many of which are cooled directly by lake water with its potential for bio-fouling and 'BIC' (Biologically Induced Corrosion). This paper focuses primarily on the engineering assessment, inspection, repair and general refurbishment of the balance-of-plant heat exchangers. As will be discussed in the paper, the assessment of the

  14. Evaluation of a pilot fish handling system at Bruce NGS 'A'

    International Nuclear Information System (INIS)

    Griffiths, J.S.

    1985-10-01

    A pilot fish recovery system using a Hidrostal fish pump was tested in the Bruce NGS 'A' forebay during June, 1984. Despite low forebay fish concentrations, the system was capable of capturing 97,000 alewife/day (3900 kg) if operated continuously. Post-pumping survival averaged 97%. It is estimated that a single pump could handle alewife runs in the 40,000 to 70,000 kg range, but multiple pumps or a single larger pump would be required to assure station protection from the largest runs (>100,000 kg). Results indicate that tank/trailer return of pumped fish is feasible, but other alternatives for returning fish to Lake Huron are also being considered

  15. Mitigation of organically bound sulphate from water treatment plants at Bruce NGS and impact on steam generator secondary side chemistry control

    Energy Technology Data Exchange (ETDEWEB)

    Nashiem, R.; Davloor, R.; Harper, B.; Smith, K. [Bruce Power, Tiverton, Ontario (Canada); Gauthier, C. [CTGIX Services Inc., Burlington, Ontario (Canada); Schexnailder, S. [GE Water and Process Technologies, Dallas, Texas (United States)

    2010-07-01

    Bruce Power is the source of more than 20 per cent of Ontario's electricity and currently operates six reactor units at the Bruce Nuclear Generating Station A (two units) and B (four units) stations located on Lake Huron. This paper discusses the challenges faced and operating experience (OPEX) gained in meeting WANO 1.0 chemistry performance objectives for steam generator secondary side chemistry control, particularly with control of steam generator sulphates. A detailed sampling and analysis program conducted as part of this study concluded that a major contributor to steam generator (SG) elevated sulphates is Organically Bound Sulphate (OBS) in Water Treatment Plants (WTP) effluent. The Bruce A and B WTPs consist of clarification with downstream sand and carbon filtration for Lake Water pre-treatment, which are followed by conventional Ion Exchange (IX) demineralization. Samples taken from various locations in the process stream were analyzed for a variety of parameters including both organic bound and inorganic forms of sulphate. The results are inconclusive with respect to finding the definitive source of OBS. This is primarily due to the condition that the OBS in the samples, which are in relatively low levels, are masked during chemical analysis by the considerably higher inorganic sulphate background. Additionally, it was also determined that on-line Total Organic Carbon (TOC) levels at different WTP locations did not always correlate well with OBS levels in the effluent, such that TOC could not be effectively used as a control parameter to improve OBS performance of the WTP operation. Improvement efforts at both plants focused on a number of areas including optimization of clarifier operation, replacement of IX resins, addition of downstream mobile polishing trailers, testing of new resins and adsorbents, pilot-scale testing with a Reverse Osmosis (RO) rig, review of resin regeneration and backwashing practices, and operating procedure improvements

  16. Mitigation of organically bound sulphate from water treatment plants at Bruce NGS and impact on steam generator secondary side chemistry control

    International Nuclear Information System (INIS)

    Nashiem, R.; Davloor, R.; Harper, B.; Smith, K.; Gauthier, C.; Schexnailder, S.

    2010-01-01

    Bruce Power is the source of more than 20 per cent of Ontario's electricity and currently operates six reactor units at the Bruce Nuclear Generating Station A (two units) and B (four units) stations located on Lake Huron. This paper discusses the challenges faced and operating experience (OPEX) gained in meeting WANO 1.0 chemistry performance objectives for steam generator secondary side chemistry control, particularly with control of steam generator sulphates. A detailed sampling and analysis program conducted as part of this study concluded that a major contributor to steam generator (SG) elevated sulphates is Organically Bound Sulphate (OBS) in Water Treatment Plants (WTP) effluent. The Bruce A and B WTPs consist of clarification with downstream sand and carbon filtration for Lake Water pre-treatment, which are followed by conventional Ion Exchange (IX) demineralization. Samples taken from various locations in the process stream were analyzed for a variety of parameters including both organic bound and inorganic forms of sulphate. The results are inconclusive with respect to finding the definitive source of OBS. This is primarily due to the condition that the OBS in the samples, which are in relatively low levels, are masked during chemical analysis by the considerably higher inorganic sulphate background. Additionally, it was also determined that on-line Total Organic Carbon (TOC) levels at different WTP locations did not always correlate well with OBS levels in the effluent, such that TOC could not be effectively used as a control parameter to improve OBS performance of the WTP operation. Improvement efforts at both plants focused on a number of areas including optimization of clarifier operation, replacement of IX resins, addition of downstream mobile polishing trailers, testing of new resins and adsorbents, pilot-scale testing with a Reverse Osmosis (RO) rig, review of resin regeneration and backwashing practices, and operating procedure improvements

  17. AECB staff annual assessment of the Bruce Heavy Water Plant for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    This report is the Atomic Energy Control Board staff assessment of the operation of Bruce Heavy Water Plant (BHWP) during 1994. BHWP operation was acceptably safe in 1994. At BHWP, Ontario Hydro did not breach any of the regulations issued under the authority of the Atomic Energy Control Act. There were four minor violations of the BHWP Operating Licence. In all cases, Ontario Hydro exceeded Ontario Hydro government limits for releases to the environment. None of the events threatened public health or the environment. 2 figs

  18. Responses of platinum, vanadium and cobalt self-powered flux detectors near simulated booster rods in a ZED-2 mockup of a Bruce reactor core

    International Nuclear Information System (INIS)

    French, P.M.; Shields, R.B.; Kroon, J.C.

    1978-02-01

    The static responses of Pt, V and Co self-powered detectors have been compared with copper-foil neutron activation profiles in reference and perturbed Bruce reactor core mockups assembled in the ZED-2 test reactor at Chalk River Nuclear Laboratories. The results indicate that the normalized response of each self-powered detector is an accurate measure of the thermal-neutron flux at locations greater than one lattice pitch from either a booster rod or the core boundary. They indicate that, in the Bruce booster/detector configuration, the normalized static Pt response overestimates the neutron flux by less than 3.5% upon full booster-rod insertion. (author)

  19. Control maintenance training program for special safety systems at Bruce B

    International Nuclear Information System (INIS)

    Reinwald, G.

    1997-01-01

    It was recognized from the early days of commissioning of Bruce B that Control Maintenance staff would require a level of expertise to be able to maintain Special Safety Systems in proper running order. In the early 80's this was achieved through hands on experience during the original commissioning, troubleshooting and placing of the various systems in service. Control maintenance procedures were developed and implemented as the new systems came available for commissioning, as were operating manuals,training manuals etc. Under the development of the Maintenance Manager, a Conduct of Maintenance section was organized. One of the responsibilities of this section was to develop a series of Maintenance Administrative Procedures (MAPs) that set the standards for maintenance activities including training

  20. AECB staff annual assessment of the Bruce Heavy Water Plant for the year 1995

    International Nuclear Information System (INIS)

    1996-06-01

    The Atomic Energy Control Board's staff annual assessment of the operation of Bruce Heavy Water Plant (BHWP) during 1995. BHWP operation was acceptably safe in 1995. At BHWP, Ontario Hydro complied with the regulations issued under the authority of the Atomic Energy Control Act. AECB is satisfied that BHWP did not pose any undue risk to public health or safety or to the environment. Ontario Hydro met all safety system and safety related system availability targets at BHWP in 1995. The emergency response capability is satisfactory. 2 figs

  1. Fuel handling solutions to power pulse at Bruce NGS A

    International Nuclear Information System (INIS)

    Day, R.C.

    1996-01-01

    In response to the discovery of the power pulse problem in March of 1993, Bruce A has installed flow straightening shield plugs in the inner zone channels of all units to partially reduce the gap and gain an increase in reactor power to 75%. After review and evaluation of solutions to manage the gap, including creep compensators and long fuel bundles, efforts have focused on a different solution involving reordering the fuel bundles to reverse the burnup profile. This configuration is maintained by fuelling with the flow and providing better support to the highly irradiated downstream fuel bundles by changing the design of the outlet shield plug. Engineering changes to the fuel handling control system and outlet shield plug are planned to be implemented starting in June 1996, thereby eliminating the power pulse problem and restrictions on reactor operating power. (author). 2 refs., 1 tab., 2 figs

  2. Fuel handling solutions to power pulse at Bruce NGS A

    Energy Technology Data Exchange (ETDEWEB)

    Day, R C [Ontario Hydro, Tiverton, ON (Canada). Bruce Nuclear Generating Station-A

    1997-12-31

    In response to the discovery of the power pulse problem in March of 1993, Bruce A has installed flow straightening shield plugs in the inner zone channels of all units to partially reduce the gap and gain an increase in reactor power to 75%. After review and evaluation of solutions to manage the gap, including creep compensators and long fuel bundles, efforts have focused on a different solution involving reordering the fuel bundles to reverse the burnup profile. This configuration is maintained by fuelling with the flow and providing better support to the highly irradiated downstream fuel bundles by changing the design of the outlet shield plug. Engineering changes to the fuel handling control system and outlet shield plug are planned to be implemented starting in June 1996, thereby eliminating the power pulse problem and restrictions on reactor operating power. (author). 2 refs., 1 tab., 2 figs.

  3. SORO post-simulations of Bruce A Unit 4 in-core flux detector verification tests

    Energy Technology Data Exchange (ETDEWEB)

    Braverman, E.; Nainer, O. [Bruce Power, Nuclear Safety Analysis and Support Dept., Toronto, Ontario (Canada)]. E-mail: Evgeny.Braverman@brucepower.com; Ovidiu.Nainer@brucepower.com

    2004-07-01

    During the plant equipment assessment prior to requesting approval for restart of Bruce A Units 3 and 4 it was determined that all in-core flux detectors needed to be replaced. Flux detector verification tests were performed to confirm that the newly installed detectors had been positioned according to design specifications and that their response closely follows the calculated flux shape changes caused by selected reactivity mechanism movements. By comparing the measured and post-simulated RRS and NOP detector responses to various perturbations, it was confirmed that the new detectors are wired and positioned correctly. (author)

  4. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  5. Bruce NGS a loss of flow analysis for effectiveness of level 2 defence-in-depth provisions

    International Nuclear Information System (INIS)

    Won, W.; Jiang, Y.; Kwee, M.; Xue, J.

    2014-01-01

    The concept of defence-in-depth is applied to CANDU (CANada Deuterium Uranium) reactor designs and operations to provide series of levels of defence to prevent accidents progressing and to provide protection for reactor and public safety. The level 2 defence-in-depth provisions are designed to detect and intercept deviation from normal operation in order to prevent anticipated operating occurrences (AOOs) from escalating to accident conditions, and to return the plant to a state of normal operations, according to the Canada Nuclear Safety Commission (CNSC) regulatory document RD-337. Historically, safety analysis has focused on the effectiveness of level 3 defence-in-depth provisions in accident conditions, and the effectiveness of level 2 defence-in-depth has not been assessed. In this study, the effectiveness of Level 2 defence-in-depth is assessed for loss of flow (LOF) events for Bruce Nuclear Generating Station (NGS) A reactors. The level 2 defence-in-depth in Bruce NGS A design is identified to be the stepback function of reactor regulating system (RRS). The behavior of RRS stepback following the initiation of loss of flow event is simulated using RFSP/TUF/RRS - em coupled code. The behavior of full system and single channel is simulated and assessed against the acceptance criteria - fitness for service of systems, structures and components (SSCs). (author)

  6. Bruce NGS a loss of flow analysis for effectiveness of level 2 defence-in-depth provisions

    Energy Technology Data Exchange (ETDEWEB)

    Won, W. [AMEC NSS, Toronto, ON (Canada); Jiang, Y.; Kwee, M.; Xue, J. [Bruce Power, Toronto, ON (Canada)

    2014-07-01

    The concept of defence-in-depth is applied to CANDU (CANada Deuterium Uranium) reactor designs and operations to provide series of levels of defence to prevent accidents progressing and to provide protection for reactor and public safety. The level 2 defence-in-depth provisions are designed to detect and intercept deviation from normal operation in order to prevent anticipated operating occurrences (AOOs) from escalating to accident conditions, and to return the plant to a state of normal operations, according to the Canada Nuclear Safety Commission (CNSC) regulatory document RD-337. Historically, safety analysis has focused on the effectiveness of level 3 defence-in-depth provisions in accident conditions, and the effectiveness of level 2 defence-in-depth has not been assessed. In this study, the effectiveness of Level 2 defence-in-depth is assessed for loss of flow (LOF) events for Bruce Nuclear Generating Station (NGS) A reactors. The level 2 defence-in-depth in Bruce NGS A design is identified to be the stepback function of reactor regulating system (RRS). The behavior of RRS stepback following the initiation of loss of flow event is simulated using RFSP/TUF/RRS{sub -}em coupled code. The behavior of full system and single channel is simulated and assessed against the acceptance criteria - fitness for service of systems, structures and components (SSCs). (author)

  7. Bruce's Magnificent Quartet: Inquiry, Community, Technology and Literacy--Implications for Renewing Qualitative Research in the Twenty-First Century

    Science.gov (United States)

    Davidson, Judith

    2014-01-01

    Bruce and Bishop's community informatics work brings forward four critical concepts: inquiry, community, technology, and literacy. These four terms serve as the basis for a discussion of qualitative research in the twenty-first century--what is lacking and what is needed. The author suggests that to resolve the tensions or challenges…

  8. Corrosion-product inventory: the Bruce-B secondary system

    International Nuclear Information System (INIS)

    Sawicki, J.A.; Price, J.; Brett, M.E.

    1995-01-01

    Corrosion inspection and corrosion-product characterization in water and steam systems are important for component and systems maintenance in nuclear power stations. Corrosion products are produced, released and redeposited at various sites in the secondary system. Depending on the alloys used in the condenser and feedwater heaters, particulate iron oxides and hydroxides can account for about 95-99% of the total corrosion-product transport. Where brass or cupro-nickel alloys are present, copper and zinc contribute significantly to the total transport and deposition. Particulates are transported by the feedwater to the steam generators, where they accumulate and can cause a variety of problems, such as loss of heat transfer capability through deposition on boiler tubes, blockage of flow through boiler-tube support plates and accelerated corrosion in crevices, either in deep sludge piles or at blocked tube supports. The influx of oxidized corrosion products may have a particularly adverse effect on the redox environment of steam generator tubing, thereby increasing the probability of localized corrosion and other degradation mechanisms. In this paper, there is a description of a survey of general corrosion deposits in Bruce-B, Units 5-8, which helps to identify the origin, evolution and inventory of corrosion products along the secondary system of Candu reactors

  9. Chemical cleaning of the Bruce A steam generators

    International Nuclear Information System (INIS)

    Le Surf, J.E.; Mason, J.B.; Symmons, W.R.; Yee, F.

    1992-01-01

    Deposits consisting mostly of oxides and salts and copper metal in the secondary side of the steam generators at the Bruce A Nuclear Generating Station have caused instability in the steam flow and loss of heat capacity, resulting in derating of the units and reduction in power production. Attempts to remove the deposits by pressure pulsing were unsuccessful. Water lancing succeeded in restoring stability, but restrictions on access prevented complete lancing of the tube support plate holes. Chemical cleaning using a modified EPRI-SGOG process has been selected as the best method of removing the deposits. A complete chemical cleaning system has been designed and fabricated for Ontario Hydro by Pacific Nuclear, with support from AECL CANDU and their suppliers. The system consists of self contained modules which are easily interconnected on site. The whole process is controlled from the Control Module, where all parameters are monitored on a computer video screen. The operator can control motorized valves, pumps and heaters from the computer key board. This system incorporates all the advanced technologies and design features that have been developed by Pacific Nuclear in the design, fabrication and operation of many systems for chemical decontamination and cleaning of nuclear systems. 2 figs

  10. Uncover the mantle: rediscovering Gregório Lopes palette and technique with a study on the painting "Mater Misericordiae"

    Science.gov (United States)

    Antunes, Vanessa; Candeias, António; Oliveira, Maria J.; Carvalho, Maria L.; Dias, Cristina Barrocas; Manhita, Ana; Francisco, Maria J.; Costa, Sónia; Lauw, Alexandra; Manso, Marta

    2016-11-01

    Gregório Lopes (c. 1490-1550) was one of the most prominent painters of the renaissance and Mannerism in Portugal. The painting "Mater Misericordiae" made for the Sesimbra Holy House of Mercy, circa 1535-1538, is one of the most significant works of the artist, and his only painting on this theme, being also one of the most significant Portuguese paintings of sixteenth century. The recent restoration provided the possibility to study materially the painting for the first time, with a multianalytical methodology incorporating portable energy-dispersive X-ray fluorescence spectroscopy, scanning electron microscopy-energy-dispersive spectroscopy, micro-X-ray diffraction, micro-Raman spectroscopy and high-performance liquid chromatography coupled to diode array and mass spectrometry detectors. The analytical study was complemented by infrared reflectography, allowing the study of the underdrawing technique and also by dendrochronology to confirm the date of the wooden panels (1535-1538). The results of this study were compared with previous ones on the painter's workshop, and significant differences and similitudes were found in the materials and techniques used.

  11. 75 FR 3217 - J&T Hydro Company; H. Dean Brooks and W. Bruce Cox; Notice of Application for Transfer of License...

    Science.gov (United States)

    2010-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11392-009] J&T Hydro Company; H. Dean Brooks and W. Bruce Cox; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene January 12, 2010. On October 30, 2009, J&T Hydro Company (transferor) and...

  12. AECB staff annual report of Bruce B NGS for the year 1991

    International Nuclear Information System (INIS)

    1992-11-01

    In this account of Bruce NGS B station operation during the year 1991 AECB staff have pointed out non-compliances with the operating licence, which have been few in number and minor in degree of seriousness. There were no exposures of workers to radiation in excess of regulatory limits, but there were contraventions of the ALARA principle. Releases of radioactive material to the environment have been well below the target levels. The performance of the four special safety systems has been good, except for the containment system. A review of the significant event reports and the causes of the events has revealed a lack of a system by which operations and maintenance work could be verified to have been carried out as intended. In operations and maintenance the backlog of work to be done to regularize temporary changes to equipment (removal of jumpers), to carry out preventive maintenance (call-ups), and to make repairs (deficiency reports) has increased from that of the previous year. On the other hand, the station has reduced the number of temporary operating instructions (operating memos) to half of what it was last year. The fretting of steam generator tubes reported last year has not become worse. Nevertheless, inspections continue and modifications to the tube supports are underway. Overall plant chemistry has been acceptable. An Ontario Hydro assessment of the station found the station management's expectations for maintaining the margin of safety in the plant had not been properly communicated to all levels of station staff. The station is now attempting to correct this. Infractions of work protection procedures, which were the subject of many significant events, have led to changes in the procedures and resulted in a major training effort. AECB staff believe that Ontario Hydro has continued to operate Bruce NGS B in a safe manner, but have pointed out areas where improvement is required. (Author)

  13. Mediador cultural ou antropólogo do mal: Bruce Albert e o caso de “A queda do céu”

    Directory of Open Access Journals (Sweden)

    Karla Alessandra Alves de Souza Ferreira

    2017-07-01

    Full Text Available Este estudo desenvolve uma análise crítica sobre o fragmento “Postscriptum, quando eu é um outro (e vice-versa”, apresentado na obra A Queda do céu: palavras de um xamã yanomami. O livro foi pensado por um xamã yanomami; Davi Kopenawa, e produzido por um etnólogo francês Bruce Albert. Problematizo o processo de produção do livro onde dois universos culturais se encontram, uma produção literária indígena do povo Yanomami que apresenta uma coautoria. Essa análise busca investigar a postura epistêmica de Bruce Albert como mediador cultural ou “antropólogo do mal” no processo de elaboração do livro, a fim de levantar questionamentos sobre o ato tradutório e suas implicações, destacando os desa os e contribuições apresentadas nesse processo. Nesta direção, esse artigo se fundamenta nos pensamentos da história cultural.

  14. Primary Water Chemistry Control during a Planned Outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, Guoping; Nashiem, Rod; Matheson, Shane; Yabar, Berman; Harper, Bill; Roberts, John G.

    2012-09-01

    Bruce Power has developed a comprehensive outage water chemistry program, which includes both primary and secondary chemistry requirements during planned outages. The purpose of the program is to emphasize the chemistry requirements during outages and subsequent start-ups in order to maintain the integrity of the systems, minimise activity transport and radiation fields, reduce the Carbon-14 release, and to ensure that the requirements are integrated with the outage management program. Prior to a planned outage, Station Chemical Technical Sections identify outage chemistry requirements to Operations and Outage Planning and ensure that work necessary to correct system chemistry issues is within outage work scope. The outage water chemistry program provides direction for establishing alternative sampling locations as demanded by the system configuration during the outage and identifies outage prerequisites for nuclear system purification capabilities. These requirements are contained in an outage checklist. The paper mainly highlights the primary water chemistry issues and chemistry control strategies during planned outages and discusses challenges and successes. (authors)

  15. Water lancing of Bruce-A Unit 3 and 4 steam generators

    International Nuclear Information System (INIS)

    Puzzuoli, F.V.; Murchie, B.; Allen, S.

    1995-01-01

    During the Bruce-A 1993 Unit 4 and 1994 Unit 3 outages, three water lancing operations were carried out along with chemical cleaning as part of the station boiler refurbishment program. The water lancing activities focused on three boiler areas.. 1) support plates to clean partially or completely blocked broach holes and prevent boiler water level oscillations, 2) hot leg U-bend supports (HLUBS) to remove deposits contributing to boiler tube stress corrosion cracking (SCC) and 3) tube sheets to dislodge sludge piles that potentially threaten boiler tube integrity and to flush out post chemical cleaning insoluble residues. The combination of water lancing and chemical cleaning effectively reduced broach hole blockage from up to 100% to 0-10% or less. As a result, boilers in Units 3 and 4 will operate for some time to come without concerns over water level oscillations. However, deposits remained in most tube support plate land areas. (author)

  16. Feasibility analysis of the utilization of moderator heat for agricultural and aquacultural purposes, Bruce nuclear power development

    International Nuclear Information System (INIS)

    1977-12-01

    A study is presented of the feasibility of using moderator reject heat from the Bruce nuclear power development either to heat greenhouses or to aid in a warm water hatchery or aquaculture operation. The study examines heat extraction and delivery plans, reliability of supply, pricing schedules, the Ontario greenhouse industry, site selection criteria, water transmission and distribution, costs, approvals required, and a construction timetable. Total system analysis shows that a greenhouse facility would be viable but the aquaculture/hatchery scheme is more cost-effective. (E.C.B.)

  17. Hydraulic Testing of Silurian and Ordovician Strata at the Bruce Site

    Science.gov (United States)

    Beauheim, R. L.; Avis, J. D.; Chace, D. A.; Roberts, R. M.; Toll, N. J.

    2009-05-01

    Ontario Power Generation is proposing a Deep Geologic Repository (DGR) for the long-term management of its Low and Intermediate Level Radioactive Waste (L&ILW) within a Paleozoic-age sedimentary sequence beneath the Bruce Site near Tiverton, Ontario, Canada. The concept envisions that the DGR would be excavated at a depth of approximately 680 m within the Ordovician Cobourg Formation, a massive, dense, argillaceous limestone. A key attribute of the Bruce site is the extremely low permeabilities associated with the thick Ordovician carbonate and argillaceous bedrock formations that will host and enclose the DGR. Such rock mass permeabilities are thought sufficiently low to contribute toward or govern a diffusion-dominated transport regime. To support this concept, hydraulic testing was performed in 2008 and 2009 in two deep boreholes at the proposed repository site, DGR-3 and DGR-4. The hydraulic testing was performed using a straddle-packer tool with a 30.74-m test interval. Sequential tests were performed over the entire open lengths of the boreholes from the F Unit of the Silurian Salina Formation into the Ordovician Gull River Formation, a distance of approximately 635 m. The tests consisted primarily of pressure-pulse tests, with a few slug tests performed in several of the higher permeability Silurian units. The tests are analyzed using the nSIGHTS code, which allows the entire pressure history a test interval has experienced since it was penetrated by the drill bit to be included in the test simulation. nSIGHTS also allows the model fit to the test data to be optimized over an n-dimensional parameter space to ensure that the final solution represents a true global minimum rather than simply a local minimum. The test results show that the Ordovician-age strata above the Coboconk Formation (70+ m below the Cobourg) have average horizontal hydraulic conductivities of 1E-13 m/s or less. Coboconk and Gull River hydraulic conductivities are as high as 1E-11 m

  18. Bruce NGS B risk assessment (BBRA) peer review process

    International Nuclear Information System (INIS)

    Kaasalainen, S.; Crocker, W.P.; Webb, W.A.

    2001-01-01

    Risk-informed decision making is considered an effective approach to managing the risk of nuclear power plant operation in a competitive market. Hence, increased reliance on the station probabilistic risk assessments (PRAs) to provide risk perspective inputs is inevitable. With increased reliance on the PRAs it is imperative that PRAs have the characteristics necessary to provide the required information. Recognizing the increased requirements on nuclear power plant PRAs the nuclear industry in the United States has expended significant effort over the past few years defining the required characteristics of a PRA for various applications. More recently several owners groups have drafted guidelines for PRA certification and several U.S. utilities have had their PRAs certified. During the year 2000 Ontario Power Generation, Nuclear (OPG,N) subjected the PRA of one of its stations to the U.S. style certification process. The PRA selected for this process was the Bruce B Risk Assessment (BBRA). BBRA was chosen for this process since it is the first OPG, N PRA to be used for risk-informed applications. However, the strengths of the BBRA identified from the certification process and the lessons learned are also largely applicable to the other OPG, N plant PRAs due to the use of similar methods and tools

  19. Design and verification of computer-based reactor control system modification at Bruce-A candu nuclear generating station

    International Nuclear Information System (INIS)

    Basu, S.; Webb, N.

    1995-01-01

    The Reactor Control System at Bruce-A Nuclear Generating Station is going through some design modifications, which involve a rigorous design process including independent verification and validation. The design modification includes changes to the control logic, alarms and annunciation, hardware and software. The design (and verification) process includes design plan, design requirements, hardware and software specifications, hardware and software design, testing, technical review, safety evaluation, reliability analysis, failure mode and effect analysis, environmental qualification, seismic qualification, software quality assurance, system validation, documentation update, configuration management, and final acceptance. (7 figs.)

  20. AECB staff annual assessment of the Bruce A Nuclear Generating Station for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    AECB believe that Ontario Hydro operated Bruce A in a safe manner during 1994, and that the risk to workers and the public has been maintained at an acceptably low level. Radiation doses to workers and releases to the environment were well below regulatory limits. All special safety systems met availability targets. We noted improvements in operation and maintenance but some further improvements are still required. This is particularly true of the station's compliance with the Operating Licence. AECB believe that the station continues to be well managed, with a high priority placed on safety. However, there is a need for increased capability in the area of safety analysis and assessment. 4 tabs., 4 figs

  1. Retrofitting alarm prioritization at Bruce A: strategy development and implementation experience

    International Nuclear Information System (INIS)

    Davey, E.; Hickey, D.; Babcock, B.

    1997-01-01

    A prioritization strategy for computer-displayed control room alarms has been developed for Bruce A to better assist operations staff in visually identifying key alarms and judging the relative importance of alarms. The strategy consists of assigning each alarm indicative of a problem to be addressed to one of five priority categories. Each alarm is assigned to an alarm category based on an off-line analysis of the consequence and response characteristics applicable to the alarm for three plant operating contexts. The colour of the alarm message is used to convey the priority category of each alarm in computer-based alarm displays. In addition, alarms indicative of non-problematic changes in the state of plant equipment and processes are given a separate colour assignment to visually differentiate them from alarms indicative of problems. This paper outlines the user-based approach employed in the prioritization strategy development, describes the key features of the prioritization strategy adopted, and discusses the initial experience in systematically determining the priority assignments for all 6000 computer-based alarms associated with each generating unit. (author)

  2. Steam generator replacement at Bruce A: approach, results, and lessons learned

    International Nuclear Information System (INIS)

    Tomkiewicz, W.; Savage, B.; Smith, J.

    2008-01-01

    Steam Generator Replacement is now complete in Bruce A Units 1 and 2. In each reactor, eight steam generators were replaced; these were the first CANDU steam generator replacements performed anywhere in the world. The plans for replacement were developed in 2004 and 2005, and were summarized in an earlier paper for the CNS Conference held in November, 2006. The present paper briefly summarizes the methodologies and special processes used such as metrology, cutting and welding and heavy lifting. The paper provides an update since the earlier report and focuses on the project achievements to date, such as: - A combination of engineered methodology, laser metrology and precise remote machining led to accurate first time fit-ups of each new replacement steam generator and steam drums - Lessons learned in the first unit led to schedule improvements in the second unit - Dose received was lowest recorded for any steam generator replacement project. The experience gained and lessons learned from Units 1 and 2 will be valuable in planning and executing future replacement steam generator projects. A video was presented

  3. Floral micromorphology of the genus Ensete Bruce ex Horan. (Musaceae in Thailand

    Directory of Open Access Journals (Sweden)

    Wandee Inta

    2015-09-01

    Full Text Available To fulfil scarce and incomplete information on floral micromorphology of ensets (Ensete Bruce ex Horan. in the banana family (Musaceae, a comparative anatomical study of two species: E. glaucum (Roxb. Cheesman and E. superbum (Roxb. Cheesman, native to Thailand was conducted. It was found that, apart from five fertile stamens presented in other members of the Musaceae family, both ensets possess a short staminode. It is suggested from this investigation that six is the basic number of Ensete androecial whorl and the taxa could secure the most primitive status within the family and the Zingiberales order, of which stamen numbers are reduced. The results also indicated that the vascular bundle position in compound tepal, the vascular patterns in vascular zone of ovary and cell shapes of stigma epidermis and the ovary cortex are of systematic significance in conjunction with pollen size and exine ornamentation. These useful micromorphological characters can be further applied for identification of other Ensete species distribute elsewhere in the world.

  4. Hydrogeological evidence of low rock mass permeabilities in ordovician strata: Bruce nuclear site

    International Nuclear Information System (INIS)

    Beauheim, R.L.; Roberts, R.M.; Avis, J.D.; Heagle, D.

    2011-01-01

    One of the key attributes contributing to the suitability of the Bruce nuclear site to host a Deep Geologic Repository (DGR) for Low and Intermediate Level Waste (L&ILW) is the low permeability of the Ordovician host rock and of the overlying and underlying strata. The permeability of these rocks is so low that diffusion is a much more significant transport mechanism than advection. Hydrogeological evidence for the low permeability of the Ordovician strata comes from two principal sources, direct and indirect. Direct evidence of low permeability is provided by the hydraulic testing performed in deep boreholes, DGR-2 through DGR-6. Straddle-packer hydraulic testing was performed in 57 Ordovician intervals in these five holes. The testing provided continuous coverage using ~30-m straddle intervals of the Ordovician strata exposed in boreholes DGR-2, DGR-3, DGR-4, and DGR-5, while testing was targeted on discontinuous 10.2-m intervals in DGR-6. The average horizontal hydraulic conductivities of these intervals determined from the tests ranged from 2E-16 to 2E-10 m/s. The Lower Member of the Cobourg Formation, which is the proposed host formation for the DGR, was found to have a horizontal hydraulic conductivity of 4E-15 to 3E-14 m/s. The only horizontal hydraulic conductivity values measured that were greater than 2E-12 m/s are from the Black River Group, located at the base of the Ordovician sedimentary sequence. Indirect evidence of low permeability is provided by the observed distribution of hydraulic heads through the Ordovician sequence. Hydraulic head profiles, defined by hydraulic testing and confirmed by Westbay multilevel monitoring systems, show significant underpressures relative to a density-compensated hydrostatic condition throughout most of the Ordovician strata above the Black River Group, whereas the Black River Group is overpressured. Pressure differences of 1 MPa or more are observed between adjacent intervals in the boreholes. The observed

  5. Stress corrosion cracking experience in steam generators at Bruce NGS

    International Nuclear Information System (INIS)

    King, P.J.; Gonzalez, F.; Brown, J.

    1993-01-01

    In late 1990 and through 1991, units 1 and 2 at the Bruce A Nuclear Generating Station (BNGS-A) experienced a number of steam generator tube leaks. Tube failures were identified by eddy current to be circumferential cracks at U-bend supports on the hot-leg side of the boilers. In late 1991, tubes were removed from these units for failure characterization. Two active failure modes were found: corrosion fatigue in both units 1 and 2 and stress corrosion cracking (SCC) in unit 2. In unit 2, lead was found in deposits, on tubes, and in cracks, and the cracking was mixed-mode: transgranular and intergranular. This convincingly indicated the involvement of lead in the stress corrosion cracking failures. A program of inspection and tube removals was carried out to investigate more fully the extent of the problem. This program found significant cracking only in lead-affected boilers in unit 2, and also revealed a limited extent of non-lead-related intergranular stress corrosion cracking in other boilers and units. Various aspects of the failures and tube examinations are presented in this paper. Included is discussion of the cracking morphology, measured crack size distributions, and chemical analysis of tube surfaces, crack faces, and deposits -- with particular emphasis on lead

  6. Methyl iodide trapping efficiency of aged charcoal samples from Bruce-A emergency filtered air discharge systems

    International Nuclear Information System (INIS)

    Wren, J.C.; Moore, C.J.; Rasmussenn, M.T.; Weaver, K.R.

    1999-01-01

    Charcoal filters are installed in the emergency filtered air discharge system (EFADS) of multiunit stations to control the release of airborne radioiodine in the event of a reactor accident. These filters use highly activated charcoal impregnated with triethylenediamine (TEDA). The TEDA-impregnated charcoal is highly efficient in removing radioiodine from flowing airstreams. The iodine-removal efficiency of the charcoal is presumed to deteriorate slowly with age, but current knowledge of this effect is insufficient to predict with confidence the performance of aged charcoal following an accident. Experiments were performed to determine the methyl iodide removal efficiency of aged charcoal samples taken from the EFADS of Ontario Hydro's Bruce-A nuclear generating station. The charcoal had been in service for ∼4 yr. The adsorption rate constant and capacity were measured under post-loss-of-coolant accident conditions to determine the efficiency of the aged charcoal. The adsorption rate constants of the aged charcoal samples were observed to be extremely high, yielding a decontamination factor (DF) for a 20-cm-deep bed of the aged charcoal >1 X 10 15 . The results show that essentially no CH 3 I would escape from a 20-cm-deep bed of the aged charcoal and that the requirement for a DF of 1000 for organic iodides in the EFADS filters would be exceeded by a tremendous margin. With such high DFs, the release of iodine from a 20-cm-deep bed would be virtually impossible to detect. The adsorption capacities observed for the aged charcoal samples approach the theoretical chemisorption capacity of 5 wt% TEDA charcoal, indicating that aging in the EFADS for 4 yr has had a negligible impact on the adsorption capacity. The results indicate that the short- and long-term performances of the aged charcoal in the EFADS of Bruce-A following an accident would still far exceed performance requirements. (author)

  7. Experience in ultrasonic gap measurement between calandria tubes and liquid injection shutdown systems nozzles in Bruce Nuclear Generating Station

    International Nuclear Information System (INIS)

    Abucay, R.C.; Mahil, K.S.; Goszczynski, J.J.

    1995-01-01

    The gaps between calandria tubes (CT) and Liquid Injection Shutdown System (LISS) nozzles at the Bruce Nuclear Generating Station ''A'' (Bruce A) are known to decrease with time due to radiation induced creep/sag of the calandria tubes. If this gap decreases to a point where the calandria tubes come into contact with the LISS nozzle, the calandria tubes could fail as a result of fretting damage. Proximity measurements were needed to verify the analytical models and ensure that CT/LISS nozzle contact does not occur earlier than predicted. The technique used was originally developed at Ontario Hydro Technologies (formerly Ontario Hydro Research Division) in the late seventies and put into practical use by Research and Productivity Council (RPC) of New Brunswick, who carried out similar measurements at Point Lepreau NGS in 1989 and 1991. The gap measurement was accomplished y inserting an inspection probe, containing four ultrasonic transducers (2 to measure gaps and 2 to check for probe tilt) and a Fredericks electrolytic potentiometer as a probe rotational sensor, inside LISS Nozzle number-sign 7. The ultrasonic measurements were fed to a system computer that was programmed to convert the readings into fully compensated gaps, taking into account moderator heavy water temperature and probe tilt. Since the measured gaps were found to be generally larger than predicted, the time to CT/LISS nozzle contact is now being re-evaluated and the planned LISS nozzle replacement will likely be deferred, resulting in considerable savings

  8. Event review: International Knapping Workshop, with Bruce Bradley, Fazenda Monte Alto, Dourado, SP (Brazil

    Directory of Open Access Journals (Sweden)

    Elisa Theodora Adriana van Veldhuizen

    2016-07-01

    Full Text Available The event took place from 3 till 8 July 2016 at Fazenda Monte Alto, Dourado, SP, Brazil. The aim of the course was to provide intensive knapping training in order to enhance analytical methods and procedures. This training was not only for students, but also professionals who were interested in the course. The course was given by Bruce Bradley (University of Exeter, who has extensive experience with Stone Age technologies and experimental archaeology. Mercedes Okumura (PPGArq, National Museum, Federal University of Rio de Janeiro and Astolfo G. M. Araujo (Museum of Archaeology and Ethnology, University of São Paulo organized the course, which was sponsored by Fazenda Monte Alto, Café Helena, and the British Academy, Newton Mobility Grants Scheme (NG140077. The workshop had 15 participants from Brazil, Uruguay, the Netherlands and Canada.

  9. My City of Ruins: Bruce Springsteen e l’utopia fra le rovine

    Directory of Open Access Journals (Sweden)

    Enrico Botta

    2011-09-01

    Full Text Available The paper focuses on My City of Ruins, the song that Bruce Springsteen sang—ten days after the 09/11 terrorist attacks—for "America: A Tribute to Heroes" and that was released in the concept album The Rising in 2002. The essay aims to highlight how the song describes the post 09/11 New York City by opposing the themes of “ruins” and “utopia.” From a textual and musical point of view, My City of Ruins is, in fact, composed of a double structure that balances different feelings: the fear, pain, and loneliness of the victims, in the rock-blues first section; the faith, love, and hope, in the gospel second part. Furthermore, the paper tries to point out how My City of Ruins no longer describes the symbolic ruins of a foreign past—in line with the nineteenth and twentieth-century American cultural tradition of the Grand Tour—but defines the physical signs of a definitively collapsed “American dream,” which can survive only in a utopian and spiritual “Promised Land.”

  10. The predictable nature of the Paleozoic sedimentary sequence beneath the Bruce nuclear site in Southern Ontario, Canada

    International Nuclear Information System (INIS)

    Parmenter, Andrew; Jensen, Mark; Crowe, Richard

    2012-01-01

    Document available in extended abstract form only. A key aspect of a Deep Geologic Repository (DGR) safety case is the ability to develop and communicate an understanding of the geologic stability and resilience to change at time frames relevant to demonstrating repository performance. As part of an on-going Environmental Assessment, Ontario Power Generation (OPG) recently completed site-specific investigations within an 850 m thick Paleozoic sedimentary sequence beneath the Bruce nuclear site for the proposed development of a DGR for Low and Intermediate Level Waste (L and ILW). As envisioned, the shaft-accessed DGR would be excavated at a nominal depth of 680 m within the low permeability Ordovician argillaceous limestone of the Cobourg Formation, which is overlain by more than 200 m of low permeability Ordovician shale. The geo-scientific investigations revealed a relatively undeformed and laterally continuous architecture within the sedimentary sequence at the repository scale (1.5 km 2 ) and beyond. This paper explores the predictable nature of the sedimentary sequence that has contributed to increasing confidence in an understanding of the spatial distribution of groundwater system properties, deep groundwater system evolution and natural barrier performance. Multi-disciplinary geo-scientific investigations of the Bruce nuclear site were completed in 3 phases between 2006 and 2010. The sub-surface investigations included a deep drilling, coring and in-situ testing program and, the completion of a 19.7 km (9 lines) 2-D seismic reflection survey. The drilling program involved 6 (150 mm dia.) deep boreholes (4-vertical; 2 inclined) that were extended through the sedimentary sequence from 4 drill sites, arranged around the 0.3 km 2 footprint of the proposed repository. The more than 3.8 km of rock core (77 mm dia.) retrieved have provided, in part, a strong basis to understand bedrock lithology and mineralogy, facies assemblages, structure, and oil and gas

  11. Removal of bulk contaminants from radioactive waste water at Bruce A using a clay based flocculent system

    International Nuclear Information System (INIS)

    Davloor, R.; Harper, B.

    2011-01-01

    Bruce Power's Bruce Nuclear Generating Station 'A', located on Lake Huron, has a treatment system that processes all aqueous radioactive waste water originating from the station. This Active Liquid Waste Treatment System (ALWTS) consists of collection tanks for the collection of radioactive waste water, a Pre-Treatment System (PTS) for the removal of bulk contaminants and suspended solids, a Reverse Osmosis System (ROS) to remove dissolved solids, an Evaporation and Solidification System (ESS) to concentrate and immobilize solids contained in concentrated waste streams from the ROS, and discharge tanks for the dispersal of the treated water. The ALWTS has been in continuous service since 1999 and is used to treat approximately 100,000 litres of Active Liquid Waste (ALW) each day. With the exception of tritium, it discharges waste water containing near zero concentrations of radioactive and conventional contaminants to the lake. The original design of the Bruce A ALWTS used a Backwashable Filtration System (BFS) to provide solids free water to the ROS, as measured by the Silt Density Index (SDI). During commissioning, the BFS was not successful in backwashing the solids from the filter elements. For approximately one year, a temporary solution was implemented using a Disposable Filtration System (DFS). A cationic polymer was added upstream of the DFS to agglomerate the solids. The system proved to be highly unreliable. It was difficult to agglomerate solids in the waste stream containing high amounts of detergent. As a result, DFS consumption was high and very costly. The SDI specification for the RO membrane was not always met, resulting in a quick decline of performance of the first stage ROS membranes in the treatment process. In addition, the excess cationic polymer in the RO feed caused the membranes to become fouled. In-house station staff, together with personnel from Colloid Environmental Technologies (CETCO) Company, worked to develop and

  12. Removal of bulk contaminants from radioactive waste water at Bruce A using a clay based flocculent system

    Energy Technology Data Exchange (ETDEWEB)

    Davloor, R.; Harper, B. [Bruce Power, Tiverton, ON (Canada)

    2011-07-01

    Bruce Power's Bruce Nuclear Generating Station 'A', located on Lake Huron, has a treatment system that processes all aqueous radioactive waste water originating from the station. This Active Liquid Waste Treatment System (ALWTS) consists of collection tanks for the collection of radioactive waste water, a Pre-Treatment System (PTS) for the removal of bulk contaminants and suspended solids, a Reverse Osmosis System (ROS) to remove dissolved solids, an Evaporation and Solidification System (ESS) to concentrate and immobilize solids contained in concentrated waste streams from the ROS, and discharge tanks for the dispersal of the treated water. The ALWTS has been in continuous service since 1999 and is used to treat approximately 100,000 litres of Active Liquid Waste (ALW) each day. With the exception of tritium, it discharges waste water containing near zero concentrations of radioactive and conventional contaminants to the lake. The original design of the Bruce A ALWTS used a Backwashable Filtration System (BFS) to provide solids free water to the ROS, as measured by the Silt Density Index (SDI). During commissioning, the BFS was not successful in backwashing the solids from the filter elements. For approximately one year, a temporary solution was implemented using a Disposable Filtration System (DFS). A cationic polymer was added upstream of the DFS to agglomerate the solids. The system proved to be highly unreliable. It was difficult to agglomerate solids in the waste stream containing high amounts of detergent. As a result, DFS consumption was high and very costly. The SDI specification for the RO membrane was not always met, resulting in a quick decline of performance of the first stage ROS membranes in the treatment process. In addition, the excess cationic polymer in the RO feed caused the membranes to become fouled. In-house station staff, together with personnel from Colloid Environmental Technologies (CETCO) Company, worked to develop and

  13. Preventive maintenance: optimization of time - based discard decisions at the bruce nuclear generating station

    International Nuclear Information System (INIS)

    Doyle, E.K.; Jardine, A.K.S.

    2001-01-01

    The use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. As previously reported at ICONE 6 in New Orleans, 1996, several innovative practices reduced Reliability Centered Maintenance costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is in place where an Expert Panel consisting of all players/experts proceed through each system in a disciplined fashion and reach agreement on all items under a rigorous time frame. It is well known that there are essentially 3 maintenance based actions that can flow from a Maintenance Optimization Analysis: condition based maintenance, time based maintenance and time based discard. The present effort deals with time based discard decisions. Maintenance data from the Remote On-Power Fuel Changing System was used. (author)

  14. Explorability and predictability of the paleozoic sedimentary sequence beneath the Bruce nuclear site

    International Nuclear Information System (INIS)

    Parmenter, A.; Jensen, M.; Crowe, R.; Raven, K.

    2011-01-01

    Ontario Power Generation (OPG) is proposing to develop a Deep Geologic Repository (DGR) for the long-term management of its Low and Intermediate Level Waste (L&ILW) at the Bruce nuclear site located in the Municipality of Kincardine, Ontario. A 4-year program of geoscientific studies to assess the suitability of the 850 m thick Palaeozoic age sedimentary sequence beneath the site to host the DGR was completed in 2010. The studies provide evidence of a geologic setting in which the DGR concept would be safely implemented at a nominal depth of 680 m within the argillaceous limestone of the Cobourg Formation. This paper describes the geologic framework of the Bruce nuclear site with a focus on illustrating the high degree of stratigraphic continuity and traceability at site-specific and regional scales within the Ordovician sediments proposed to host and enclose the DGR. As part of the site-specific studies, a program of deep drilling/coring (6 boreholes) and in-situ testing through the sedimentary sequence was completed from 4 drill sites situated beyond the DGR footprint, approximately 1 km apart. Core logging reveals that the stratigraphic sequence comprises 34 distinct bedrock formations/members/units consistent with the known regional stratigraphic framework. These layered sedimentary formations dip 0.6 o (~10 m/km) to the southwest with highly uniform thicknesses both at the site- and regional-scale, particularly, the Ordovician sediments, which vary on the order of metres. The occurrence of steeply-dipping faults within the sedimentary sequence is not revealed through surface outcrop fracture mapping, micro-seismic (M ≥ 1) monitoring, inclined borehole coring or intersection of hydrothermal type dolomitized reservoir systems. Potential fault structures, interpreted from a 2-D seismic survey, were targeted by angled boreholes which found no evidence for their existence. Formation specific continuity is also evidence by the lateral traceability of physical rock

  15. White spots on Smoke rings by Bruce Nauman: a case study on contemporary art conservation using microanalytical techniques.

    Science.gov (United States)

    Mafalda, Ana Cardeira; da Câmara, Rodrigo Bettencourt; Strzelec, Patrick; Schiavon, Nick; Mirão, José; Candeias, António; Carvalho, Maria Luísa; Manso, Marta

    2015-02-01

    The artwork "Smoke Rings: Two Concentric Tunnels, Non-Communicating" by Bruce Nauman represents a case study of corrosion of a black patina-coated Al-alloy contemporary artwork. The main concern over this artwork was the widespread presence of white spots on its surface. Alloy substrate, patina, and white spots were characterized by means of energy-dispersive X-ray fluorescence and scanning electron microscopy with energy-dispersive spectroscopy. Alloy substrate was identified as an aluminum alloy 6,000 series Al-Si-Mg. Patina's identified composition confirmed the documentation provided by the atelier. Concerning the white spots, zircon particles were found on patina surface as external elements.

  16. Characterization and dissolution studies of Bruce Unit 3 steam generator secondary side deposits

    International Nuclear Information System (INIS)

    Semmler, J.

    1998-01-01

    The physical and chemical properties of secondary side steam generator deposits in the form of powder and flake obtained from Bruce Nuclear Generating Station A (BNGS A) Unit 3 were studied. The chemical phases present in both types of deposits, collected prior to the 1994 chemical cleaning during the pre-clean water lancing campaign, were magnetite (Fe 3 O 4 ), metallic copper (Cu), hematite (Fe 2 O 3 ) and cuprous oxide (Cu 2 O). The major difference between the chemical composition of the powder and the flake was the presence of zinc silicate (Zn 2 SiO 4 ) and several unidentified silicate phases containing Ca, Al, Mn, and Mg in the flake. The flake deposit had high hardness values, high electrical resistivity, low porosity and a lower dissolution rate in the EPRI-SGOG (Electric Power Research Institute-Steam Generator Owner's Group) chemical cleaning solvents compared to the powder deposit. Differences in the deposit properties after chemical cleaning of the Unit 3 steam generators and after laboratory cleaning were noted. The presence of silicates in the deposit inhibit magnetite dissolution

  17. Identity as Fleeting Fashion? Revealing the Background of Popularity Through Bosniaherzegovina’s Adoption of Bruce Lee

    Directory of Open Access Journals (Sweden)

    Alenka Bartulović

    2007-12-01

    Full Text Available This paper reflects on the background to popular research on identification processes in modern ethnology and cultural or social anthropology. By discussing themes closely connected to identity (national and popular culture, and the construction of Others, the author reveals that identity is not merely a redundant trend that researchers recklessly pursue, but that it reflects the need to reveal existing uncertainties and is an attempt to revise errors made to date, as well as lapses of the discipline we work in. The author primarily focuses on national identity and its situational transformations and intertwining with other existing identities. Bosnia-Herzegovina is placed at the center of interest. This theoretically oriented text concludes by analyzing the idea of erecting a monument to Bruce Lee in Mostar, which reveals the full complexity of identity processes around a world marked by intense and unique global and transnational currents.

  18. Monitoring the risk of loss of heat sink during plant shutdowns at Bruce Generating Station 'A'

    International Nuclear Information System (INIS)

    Krishnan, K.S.; Mancuso, F.; Vecchiarelli, D.

    1996-01-01

    A relatively simple loss of shutdown heat sink fault tree model has been developed and used during unit outages at Bruce Nuclear Generation Station 'A' to assess, from a risk and reliability perspective, alternative heat sink strategies and to aid in decisions on allowable outage configurations. The model is adjusted to reflect the various unit configurations planned during a specific outage, and identifies events and event combinations leading to loss of fuel cooling. The calculated failure frequencies are compared to the limits consistent with corporate and international public safety goals. The importance measures generated by the interrogation of the fault tree model for each outage configuration are also used to reschedule configurations with high fuel damage frequency later into the outage and to control the configurations with relatively high probability of fuel damage to short intervals at the most appropriate time into the outage. (author)

  19. Dolomitized bryozoan bioherms from the Lower Silurian Manitoulin Formation, Bruce Peninsula, Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Anastas, A S; Coniglo, M [Waterloo Univ., ON (Canada)

    1992-06-01

    Several small, previously undescribed bioherms are present in the shallow shelf dolostones of the Manitoulin Formation at the Cabot Head and Wingfield Basin localities in the northernmost portion of the Bruce Peninsula region of southern Ontario. The bioherms, commonly associated with carbonate tempestites, range from 0.3 to 1.0 m in height and 0.9 to 2.5 m in width and are composed of bafflestones-floatstones and minor bindstones. The chief components of the bioherms are dolomitized lime mud and branching bryozoans. Bioherm building by bryozoans, although common in the ancient record, represents a great divergence from the mostly accessory frame encrusting role of bryozoans in modern environments. Minor skeletal components of the bioherms include echinoderms, rugose and tabulate corals and brachiopods. Laminar encrusting bryozoans exist in the top 10 cm of one of the bioherms. Some of the bioherms show evidence of water agitation that may be the result of current action induced by storm or tidal processes. The occurrence of the bioherms stretches the already known Llandoverian reef complex on Manitoulin Island further to the south. The reason why these bioherms did not reach sizes comparable to large Llandoverian or Wenlockian reefs and did not make the shift to coral-stromaporoid community is probably related to a complex interaction of factors such as community development, bathymetry, clasticity and salinity. 41 refs., 4 figs.

  20. The dew point response of the annulus gas system of Bruce NGS A

    International Nuclear Information System (INIS)

    Kenchington, J.; Ellis, P.J.; Meranda, D.

    1983-01-01

    The dew point response of the Annulus Gas System in Bruce A, Units 1 and 2 has been modelled in order to alert the operator of the presence of heavy water and to estimate the leak rate into the annulus. The computer model can be easily adapted to determine the Annulus Gas System dew point response in any station. It models the complex arrangement of the system and the transportation of moisture through the annuli by a combination of plug flow and mixing of CO 2 and D 2 O vapor. It predicts the response of the dew point monitor for a range of specified leak rates and positions of a leaking channel in a string of channels. This model has been used to calculate the variation of dew point and rate of change of dew point with respect to time (t). It shows that there is a maximum in the rate of dew point change (dT/dt) with respect to the corresponding dew point (T). This maximum is unique for a given leak rate and channel position. It is independent of the starting time for the leak. The computer programme has been verified by an analytical solution for the model

  1. Phytotoxicology section investigation in the vicinity of the Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the Darlington Nuclear Generating Station, in October, 1989

    International Nuclear Information System (INIS)

    1991-02-01

    The Phytotoxicology Section, Air Resources Branch is a participant in the Pickering and Bruce Nuclear Contingency Plans. The Phytotoxicology Emergency Response Team is responsible for collecting vegetation samples in the event of a nuclear emergency at any of the nuclear generating stations in the province. As part of its responsibility the Phytotoxicology Section collects samples around the nuclear generating stations for comparison purposes in the event of an emergency. Because of the limited frequency of sampling, the data from the surveys are not intended to be used as part of a regulatory monitoring program. These data represent an effort by the MOE to begin to establish a data base of tritium concentrations in vegetation. The Phytotoxicology Section has carried out seven surveys in the vicinity of Ontario Hydro nuclear generating stations since 1981. Surveys were conducted for tritium in snow in the vicinity of Bruce Nuclear Power Development (BNPD), February, 1981; tritium in cell-free water of white ash in the vicinity of BNPD, September, 1981; tritium in snow in the vicinity of BNPD, March, 1982; tritium in tree sap in the vicinity of BNPD, April, 1982; tritium in tree sap in the vicinity of BNPD, April, 1984, tritium in the cell-free water of white ash in the vicinity of BNPD, September, 1985; and, tritium in cell-free water of grass in the vicinity of Pickering Nuclear Generation Station (PNGS), October 1986. In all cases a pattern of decreasing tritium levels with increasing distance from the stations was observed. In October, 1989, assessment surveys were conducted around Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the new Darlington Nuclear Generating Station (DNGS). The purpose of these surveys was to provide baseline data for tritium in cell-free water of grass at all three locations at the same time of year. As none of the reactor units at DNGS had been brought on line at the time of the survey, this data was to be

  2. Volume reduction/solidification of liquid radioactive waste using bitumen at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    International Nuclear Information System (INIS)

    Day, J.E.; Baker, R.L.

    1995-01-01

    Ontario Hydro at the Bruce Nuclear Generating Station 'A' has undertaken a program to render the station's liquid radioactive waste suitable for discharge to Lake Huron by removing sufficient radiological and chemical contaminants to satisfy regulatory requirements for emissions. The system will remove radionuclide and chemical contaminants from five different plant waste streams. The contaminants will be immobilized and stored at on-site radioactive waste storage facilities and the purified streams will be discharged. The discharge targets established by Ontario Hydro are set well below the limits established by the Ontario Ministry of Environment (MOE) and are based on the Best Available Technology Economically Achievable Approach (B.A.T.E.A.). ADTECHS Corporation has been selected by Ontario Hydro to provide volume reduction/solidification technology for one of the five waste streams. The system will dry and immobilize the contaminants from a liquid waste stream in emulsified asphalt using thin film evaporation technology

  3. Top of tubesheet cracking in Bruce A NGS steam generator tubing - recent experience

    International Nuclear Information System (INIS)

    Clark, M.A.; Lepik, O.; Mirzai, M.; Thompson, I.

    1998-01-01

    During the Bruce A Nuclear Generating Station (BNGS-A) Unit 1 1997 planned outage, a dew point search method identified a leak in one steam generator(SG) tube. Subsequently, the tube was inspected with all available eddy current probes and removed for examination. The initial inspection results and metallurgical examination of the removed tube confirmed that the leak was due to intergranular attack/stress corrosion cracking (IGA/SCC) emanating from the secondary side of the tube at the top of the tubesheet location. Subsequently, eddy current and ultrasonic indications were found at the top of the tubesheet of other Alloy 600 SG tubes. To investigate the source of the indications and to validate the inspection probes, sections of 40 tubes with various levels of damage were removed. The metallurgical examination of the removed sections showed that both secondary side and primary side initiated, circumferential, stress corrosion cracking and intergranular attack occurred in the BNGS-A SG tubing. Significant degradation from both mechanisms was found, invariably located in the roll transition region of the top expansion joint between the tube and the tubesheet on the hot leg (304 degrees C) side of the tube. Various aspects of the failures and tube examinations are presented in this paper, including presentation of the cracking morphology, measured crack size distributions, and discussion of some factors possibly affecting the cracking. (author)

  4. Preliminary post-closure safety assessment of repository concepts for low level radioactive waste at the Bruce Site, Ontario

    International Nuclear Information System (INIS)

    Little, R.H.; Penfold, J.S.S.; Egan, M.J.; Leung, H.

    2005-01-01

    The preliminary post-closure safety assessment of permanent repository concepts for low-level radioactive waste (LLW) at the Ontario Power Generation (OPG) Bruce Site is described. The study considered the disposal of both short and long-lived LLW. Four geotechnically feasible repository concepts were considered (two near-surface and two deep repositories). An approach consistent with best international practice was used to provide a reasoned and comprehensive analysis of post-closure impacts of the repository concepts. The results demonstrated that the deep repository concepts in shale and in limestone, and the surface repository concept on sand should meet radiological protection criteria. For the surface repository concept on glacial till, it appears that increased engineering such as grouting of waste and voids should be considered to meet the relevant dose constraint. Should the project to develop a permanent repository for LLW proceed, it is expected that this preliminary safety assessment would need to be updated to take account of future site-specific investigations and design updates. (author)

  5. Exocrine Gland-Secreting Peptide 1 Is a Key Chemosensory Signal Responsible for the Bruce Effect in Mice.

    Science.gov (United States)

    Hattori, Tatsuya; Osakada, Takuya; Masaoka, Takuto; Ooyama, Rumi; Horio, Nao; Mogi, Kazutaka; Nagasawa, Miho; Haga-Yamanaka, Sachiko; Touhara, Kazushige; Kikusui, Takefumi

    2017-10-23

    The Bruce effect refers to pregnancy termination in recently pregnant female rodents upon exposure to unfamiliar males [1]. This event occurs in specific combinations of laboratory mouse strains via the vomeronasal system [2, 3]; however, the responsible chemosensory signals have not been fully identified. Here we demonstrate that the male pheromone exocrine gland-secreting peptide 1 (ESP1) is one of the key factors that causes pregnancy block. Female mice exhibited high pregnancy failure rates upon encountering males that secreted different levels of ESP1 compared to the mated male. The effect was not observed in mice that lacked the ESP1 receptor, V2Rp5, which is expressed in vomeronasal sensory neurons. Prolactin surges in the blood after mating, which are essential for maintaining luteal function, were suppressed by ESP1 exposure, suggesting that a neuroendocrine mechanism underlies ESP1-mediated pregnancy failure. The single peptide pheromone ESP1 conveys not only maleness to promote female receptivity but also the males' characteristics to facilitate memorization of the mating partner. Copyright © 2017 Elsevier Ltd. All rights reserved.

  6. Volume reduction/solidification of liquid radioactive waste using bitumen at Ontario hydro's Bruce nuclear generating station open-quotes Aclose quotes

    International Nuclear Information System (INIS)

    Day, J.E.; Baker, R.L.

    1994-01-01

    Ontario Hydro at the Bruce Nuclear Generating Station open-quotes Aclose quotes has undertaken a program to render the station's liquid radioactive waste suitable for discharge to Lake Huron by removing sufficient radiological and chemical contaminants from five different plant waste streams. The contaminants will be immobilized and stored at on-site radioactive waste storage facilities and the purified streams will be discharged. The discharge targets established by Ontario Hydro are set well below the limits established by the Ontario Ministry of Environment (MOE) and are based on the Best Available Technology Economically Achievable Approach (B.A.T.E.A.). ADTECHS Corporation has been selected by Ontario Hydro to provide volume reduction/solidification technology for one of the five waste streams. The system will dry and immobilize the contaminants from a liquid waste stream in emulsified asphalt using thin film evaporation technology

  7. Validation of DRAGON side-step method for Bruce-A restart Phase-B physics tests

    International Nuclear Information System (INIS)

    Shen, W.; Ngo-Trong, C.; Davis, R.S.

    2004-01-01

    The DRAGON side-step method, developed at AECL, has a number of advantages over the all-DRAGON method that was used before. It is now the qualified method for reactivity-device calculations. Although the side-step-method-generated incremental cross sections have been validated against those previously calculated with the all-DRAGON method, it is highly desirable to validate the side-step method against device-worth measurements in power reactors directly. In this paper, the DRAGON side-step method was validated by comparison with the device-calibration measurements made in Bruce-A NGS Unit 4 restart Phase-B commissioning in 2003. The validation exercise showed excellent results, with the DRAGON code overestimating the measured ZCR worth by ∼5%. A sensitivity study was also performed in this paper to assess the effect of various DRAGON modelling techniques on the incremental cross sections. The assessment shows that the refinement of meshes in 3-D and the use of the side-step method are two major reasons contributing to the improved agreement between the calculated ZCR worths and the measurements. Use of different DRAGON versions, DRAGON libraries, local-parameter core conditions, and weighting techniques for the homogenization of tube clusters inside the ZCR have a very small effect on the ZCR incremental thermal absorption cross section and ZCR reactivity worth. (author)

  8. Review of Ontario Hydro Pickering 'A' and Bruce 'A' nuclear generating stations' accident analyses

    International Nuclear Information System (INIS)

    Serdula, K.J.

    1988-01-01

    Deterministic safety analysis for the Pickering 'A' and Bruce 'A' nuclear generating stations were reviewed. The methodology used in the evaluation and assessment was based on the concept of 'N' critical parameters defining an N-dimensional safety parameter space. The reviewed accident analyses were evaluated and assessed based on their demonstrated safety coverage for credible values and trajectories of the critical parameters within this N-dimensional safety parameter space. The reported assessment did not consider probability of occurrence of event. The reviewed analyses were extensive for potential occurrence of accidents under normal steady-state operating conditions. These analyses demonstrated an adequate assurance of safety for the analyzed conditions. However, even for these reactor conditions, items have been identified for consideration of review and/or further study, which would provide a greater assurance of safety in the event of an accident. Accident analyses based on a plant in a normal transient operating state or in an off-normal condition but within the allowable operating envelope are not as extensive. Improvements in demonstrations and/or justifications of safety upon potential occurrence of accidents would provide further assurance of adequacy of safety under these conditions. Some events under these conditions have not been analyzed because of their judged low probability; however, accident analyses in this area should be considered. Recommendations are presented relating to these items; it is also recommended that further study is needed of the Pickering 'A' special safety systems

  9. Flux distribution measurements in the Bruce B Unit 6 reactor using a transportable traveling flux detector system

    International Nuclear Information System (INIS)

    Leung, T.C.; Drewell, N.H.; Hall, D.S.; Lopez, A.M.

    1987-01-01

    A transportable traveling flux detector (TFD) system for use in power reactors has been developed and tested at Chalk River Nuclear Labs. in Canada. It consists of a miniature fission chamber, a motor drive mechanism, a computerized control unit, and a data acquisition subsystem. The TFD system was initially designed for the in situ calibration of fixed self-powered detectors in operating power reactors and for flux measurements to verify reactor physics calculations. However, this system can also be used as a general diagnostic tool for the investigation of apparent detector failures and flux anomalies and to determine the movement of reactor internal components. This paper describes the first successful use of the computerized TFD system in an operating Canada deuterium uranium (CANDU) power reactor and the results obtained from the flux distribution measurements. An attempt is made to correlate minima in the flux profile with the locations of fuel channels so that future measurements can be used to determine the sag of the channels. Twenty-seven in-core flux detector assemblies in the 855-MW (electric) Unit 6 reactor of the Ontario Hydro Bruce B Generating Station were scanned

  10. Future plans for performance analysis and maintenance/inspection optimization of shutoff rods based on the case study of Bruce Power Unit-3 Shutoff Rod 5 inspection

    International Nuclear Information System (INIS)

    Nasimi, E.; Gabbar, H.A.

    2011-01-01

    Shutdown System 1 (SDS1) is a preferred method for a quick shutdown of nuclear fission process in CANDU (CANada Deuterium Uranium) reactor units. Failure of a routine SDS1 safety test during Fall 2009 outage resulted in the need to develop and execute a new methodology for Shutoff Rod inspection and re-evaluate the known degradation mechanisms and failure modes. This paper describes the development of this methodology and the obtained results. It also proposes several alternative solutions for the future performance analysis and maintenance/inspection optimization for SDS1 Shutoff Rods based on the Bruce Power Unit-3 Shutoff Rod 5 case study. (author)

  11. Criticality safety issues associated with the introduction of low void reactivity fuel in the Bruce reactors - a management and technical overview

    International Nuclear Information System (INIS)

    Thompson, J.W.; Austman, G.; Iglesias, F.; Schmeing, H.; Elliott, C.; Archinoff, G.

    2004-01-01

    The concept of criticality for operating reactor staff, particularly in a natural uranium-fuelled reactor, is relatively benign - the reactor is controlled at the critical condition by the regulating system. That is, issues related to criticality exist only within the reactor, in a set of carefully managed circumstances. With the introduction of enriched Low Void Reactivity Fuel (LVRF) into this operating environment comes a new 'concept of criticality', one which, although physically the same, cannot be treated in the same fashion. It may be the case that criticality can be achieved outside the reactor, albeit with a set of very pessimistic assumptions. Such 'inadvertent criticality' outside the reactor, should it occur, cannot be controlled. The consequences of such an inadvertent criticality could have far-reaching effects, not only in terms of severe health effects to those nearby, but also in terms of the negative impact on Bruce Power, and the Canadian nuclear industry in general. Thus the introduction of LVRF in the Bruce B reactors, and therefore the introduction of this new hazard, inadvertent criticality, warrants the development of a governance structure for its management. Such a program will consist of various elements, including the establishment of a framework to administer the criticality safety program, analytical assessment to support the process design, the development of operational procedures, the development of enhanced emergency procedures if necessary, and the implementation of a criticality safety training program. The entire package must be sufficient to demonstrate to station management, and the regulator, that the criticality safety risks associated with the implementation of enriched fuel have been properly evaluated, and that all necessary steps have been taken to effectively manage these risks. A well-founded Criticality Safety Program will offer such assurance. In this paper, we describe the establishment of a Criticality Safety

  12. Ombuds’ corner: stuck between a rock and a hard place? Try an open discussion!

    CERN Multimedia

    Vincent Vuillemin

    2011-01-01

    In this series, the Bulletin aims to explain the role of the Ombuds at CERN by presenting practical examples of misunderstandings that could have been resolved by the Ombuds if he had been contacted earlier. Please note that, in all the situations we present, the names are fictitious and used only to improve clarity.   Greg* is a student at CERN doing his doctoral thesis. His thesis adviser, Wilbur*, resides in a remote university and does not come to CERN very often. As a result, he and Greg interact mostly by phone or e-mail. Greg only gets the chance to speak to Wilbur face-to-face when he flies home or when a general meeting for the project is held at CERN. At CERN, Greg is under the supervision of a Section Leader, Phil*, who is responsible for the overall part of the project for which Greg is working. After two years, Greg delivered his second written report outlining his past activities as well as future ones needed to finish his doctoral thesis. Soon after, he was called by his CERN ...

  13. “Wer jetzt kein Haus hat, baut sich keines mehr”. Notes on Bruce O’Neill’s "The Space of Boredom"

    Directory of Open Access Journals (Sweden)

    George Tudorie

    2017-12-01

    Full Text Available Bruce O’Neill describes homeless men and women in Bucharest who could not navigate the downward spiral which followed the meltdown of the state-run economy after 1989. Deprived of the culturally treasured anchors of work, home, and family, and unable to participate in anything recognizably meaningful, these individuals are forced into a position of malignant contemplation, even when busy surviving. It is an experience of paralyzed restlessness which resonates with the ruins they zigzag through. The Space of Boredom captures this landscape convincingly, and in elegant prose. The book moves effortlessly from the discussion of scholarly works in a number of fields, to observation of sometimes cinematic quality. It is well argued, abundantly researched, and clear about its theoretical assumptions. If some questions remain to be answered, at least to this reader, this may be an artifact of background. Assumptions, including important ones about the nature of affects, and about boredom itself, may not be shared. Some questions of this kind will be raised in the following.

  14. David Schimmelpenninck van der Oye and Bruce W. Menning, eds., Reforming the Tsar's Army: Military Innovation in Imperial Russia from Peter the Great to the Revolution, Washington, DC: Woodrow Wilson Center and Cambridge: Cambridge UP, 2004.

    Directory of Open Access Journals (Sweden)

    David Stone

    2006-11-01

    Full Text Available David Schimmelpenninck and Bruce Menning have produced an excellent volume collecting contributions of a number of both well-established and junior scholars on the history and development of the tsarist military, grouped together around the general theme of reform. In some ways, it is comparable to Eric Lohr and Marshall Poe's complementary The Military and Society in Russia, 1450-1917 (Leiden, 2002. Schimmelpenninck and Menning's contributors, however, focus more on political and institutio...

  15. Improved synthesis of (3E,6Z,9Z)-1,3,6,9-nonadecatetraene, attraction inhibitor of bruce spanworm, Operophtera bruceata, to pheromone traps for monitoring winter moth, Operophtera brumata.

    Science.gov (United States)

    Khrimian, Ashot; Lance, David R; Mastro, Victor C; Elkinton, Joseph S

    2010-02-10

    The winter moth, Operophtera brumata (Lepidoptera: Geometridae), is an early-season defoliator that attacks a wide variety of hardwoods and, in some cases, conifers. The insect is native to Europe but has become established in at least three areas of North America including southeastern New England. The female-produced sex attractant pheromone of the winter moth was identified as (3Z,6Z,9Z)-1,3,6,9-nonadecatetraene (1), which also attracts a native congener, the Bruce spanworm, Operophtera bruceata . Dissection, or (for certainty) DNA molecular testing, is required to differentiate between males of the two species. Thus, a trapping method that is selective for winter moth would be desirable. A geometric isomer of the pheromone, (3E,6Z,9Z)-1,3,6,9-nonadecatetraene (2), can reportedly inhibit attraction of Bruce spanworm to traps without affecting winter moth catch, but use of the pheromone and inhibitor together has not been optimized, nor has the synthesis of the inhibitor. This paper presents two new syntheses of the inhibitor (3E,6Z,9Z)-1,3,6,9-nonadecatetraene based on the intermediate (3Z,6Z)-3,6-hexadecadien-1-ol (4), which has also been utilized in the synthesis of the pheromone. The syntheses combine traditional acetylenic chemistry and Wittig olefination reactions. In one approach, 2 was synthesized in 80% purity (20% being pheromone 1), and in the second, tetraene 2 of 96% purity (and free of 1) was produced in 25% overall yield from dienol 4. The last method benefitted from a refined TEMPO-mediated PhI(OAc)(2) oxidation of 4 and a two-carbon homologation of the corresponding aldehyde 7.

  16. Optimizing the use of operating experience at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    Energy Technology Data Exchange (ETDEWEB)

    Williams, E L [Operating Experience Reactor Safety, Bruce Nuclear Generating Station ' A' , Ontario Hydro, Tiverton, Ontario (Canada)

    1991-04-01

    One of the most significant lessons learned from the Three Mile Island event (March 1979), and again with the Chernobyl disaster - (April 1986) was the ongoing requirement to learn from our mistakes and near misses, and those of our fellow utilities around the world: so that as an industry we do not repeat the same mistakes. The very future of our industry will depend on how well each one of us accomplishes this important ask. This paper describes in detail the challenges encountered by one station when incorporating a comprehensive 'Operating Program'. It begins with the Corporate Office's directives to its stations for such a program; and follows up with the details of the actual station implementation of the program, and day to day operating experiences. The paper describes in detail the following Operating Experience programs: - Root Cause Determination process. The Institute of Nuclear Power Operations, Human Performance Enhancement System (HPES) as an integral component of the Root Cause process. Finding solutions for our station for problems identified elsewhere is covered herein; - Significant Event Recommendation Tracking System: - Commitment Tracking System; - Operating Experience (Sharing Lessons Learned) System. The paper will show all the above processes tie closely together and complement each other. The paper discusses the staff required for such processes and their training requirements. It recommends process time lines, reporting mechanisms, and sign off requirements. It will describe the equipment utilized to carry out this work effectively, and with a minimum of staff. One unique feature of the Bruce 'A' system is an 'Effectiveness Follow-Up', usually three to six months after the event recommendations have been completed. By rechecking the finished actions and reviewing them with the personnel involved with the originating event we ensure that the real root causes have been identified and resolved. (author)

  17. Optimizing the use of operating experience at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    International Nuclear Information System (INIS)

    Williams, E.L.

    1991-01-01

    One of the most significant lessons learned from the Three Mile Island event (March 1979), and again with the Chernobyl disaster - (April 1986) was the ongoing requirement to learn from our mistakes and near misses, and those of our fellow utilities around the world: so that as an industry we do not repeat the same mistakes. The very future of our industry will depend on how well each one of us accomplishes this important ask. This paper describes in detail the challenges encountered by one station when incorporating a comprehensive 'Operating Program'. It begins with the Corporate Office's directives to its stations for such a program; and follows up with the details of the actual station implementation of the program, and day to day operating experiences. The paper describes in detail the following Operating Experience programs: - Root Cause Determination process. The Institute of Nuclear Power Operations, Human Performance Enhancement System (HPES) as an integral component of the Root Cause process. Finding solutions for our station for problems identified elsewhere is covered herein; - Significant Event Recommendation Tracking System: - Commitment Tracking System; - Operating Experience (Sharing Lessons Learned) System. The paper will show all the above processes tie closely together and complement each other. The paper discusses the staff required for such processes and their training requirements. It recommends process time lines, reporting mechanisms, and sign off requirements. It will describe the equipment utilized to carry out this work effectively, and with a minimum of staff. One unique feature of the Bruce 'A' system is an 'Effectiveness Follow-Up', usually three to six months after the event recommendations have been completed. By rechecking the finished actions and reviewing them with the personnel involved with the originating event we ensure that the real root causes have been identified and resolved. (author)

  18. Gregório de Tours e Jordanes: a construção da memória dos ‘bárbaros’ no VI século - doi: 10.4025/actascieduc.v36i1.22223

    Directory of Open Access Journals (Sweden)

    Marcus Cruz

    2014-02-01

    Full Text Available A Antiguidade Tardia é um momento pleno de importantes transformações no mundo romano. É então que assistimos ao avanço institucional e social da Igreja cristã que, ao se aliar ao Estado romano, torna o cristianismo religião oficial do Império já sob a égide de Teodósio. Simultaneamente, observamos a incorporação das populações germânicas à sociedade baixo imperial. Um grande desafio se coloca a esses homens, isto é, a interação desses atores à Paideia romano-helenística, o universo cultural tardo antigo. Neste artigo, nosso objetivo é refletir acerca do esforço realizado pelo conhecimento histórico tardo antigo para incorporar aos seus domínios narrativos a tradição trazida pelos povos ‘bárbaros’ que desde o século V haviam se instalado e constituído um conjunto de reinos no que era, até então, a parte ocidental do Império Romano a partir das obras de Gregório de Tours e Jordanes.

  19. Bell Inequalities for Complex Networks

    Science.gov (United States)

    2015-10-26

    AFRL-AFOSR-VA-TR-2015-0355 YIP Bell Inequalities for Complex Networks Greg Ver Steeg UNIVERSITY OF SOUTHERN CALIFORNIA LOS ANGELES Final Report 10/26...performance report PI: Greg Ver Steeg Young Investigator Award Grant Title: Bell Inequalities for Complex Networks Grant #: FA9550-12-1-0417 Reporting...October 20, 2015 Final Report for “Bell Inequalities for Complex Networks” Greg Ver Steeg Abstract This effort studied new methods to understand the effect

  20. The University of Toronto's lasting contribution to war surgery: how Maj. L. Bruce Robertson fundamentally transformed thinking toward blood transfusion during the First World War.

    Science.gov (United States)

    Tien, Abigail; Beckett, Andrew; Pannell, Dylan

    2017-06-01

    During the Great War, Canadian military surgeons produced some of the greatest innovations to improve survival on the battlefield. Arguably, the most important was bringing blood transfusion practice close to the edge of the battlefield to resuscitate the many casualties dying of hemorrhagic shock. Dr. L. Bruce Robertson of the Canadian Army Medical Corps was the pioneering surgeon from the University of Toronto who was able to demonstrate the benefit of blood transfusions near the front line and counter the belief that saline was the resuscitation fluid of choice in military medicine. Robertson would go on to survive the Great War, but would be taken early in life by influenza. Despite his life and career being cut short, Robertson's work is still carried on today by many military medical organizations who strive to bring blood to the wounded in austere and dangerous settings. This article has an Appendix, available at canjsurg.ca.

  1. Molecular epidemiology of Brucella genotypes in patients at a major hospital in central Peru

    NARCIS (Netherlands)

    Nöckler, Karsten; Maves, Ryan; Cepeda, David; Draeger, Angelika; Mayer-Scholl, Anne; Chacaltana, Jesus; Castañeda, María; Espinosa, Benjamin; Castillo, Rosa; Hall, Eric; Al Dahouk, Sascha; Gilman, Robert H.; Cabeza, Franco; Smits, Henk L.

    2009-01-01

    The multiple-locus variable-number repeat analysis of 90 human Brucella melitensis isolates from a large urban area in central Peru revealed variations at 4 (Bruce07, Bruce09, Bruce18, and Bruce42) out of 16 loci investigated, of which 1 (Bruce42) also is used for species identification. Ten

  2. Military Housing Privatization Initiative (MHPI), Eglin AFB, Florida and Hurlburt Field, Florida. Final Environmental Impact Statement

    Science.gov (United States)

    2011-05-01

    Gene G. Sanderson George E. Cox Gerald A. Rush* Gerald Goodson Ginny Graybiel Glenda L. Glover Gordon Eldridge Gordon Goodin Greg Artabasy Greg... Fanc ~np. Thank you very much. COLONEL CUMBIE: Thank you, sir. !Vlr. Robert Larson . MR. LARSON: My name is Robert Larson . The Military Housing

  3. Research Staff | Photovoltaic Research | NREL

    Science.gov (United States)

    Research Staff Research Staff desc Greg Wilson Center Director Dr. Greg Wilson is the Director of @nrel.gov 303-384-6649 Bosco, Nicholas Staff Scientist Nick.Bosco@nrel.gov 303-384-6337 Braunecker, Wade IV-Physics Michael.Deceglie@nrel.gov 303-384-6104 Deline, Chris Staff Engineer Chris.Deline@nrel.gov

  4. ESH&Q Joule: Greg Gilbert | News

    Science.gov (United States)

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  5. Building Reproducible Science with Singularity Containers

    CERN Multimedia

    CERN. Geneva

    2018-01-01

    Michael Bauer first began working with containers at GSI national lab in Darmstadt, Germany, in 2017 while taking a semester off of school at the University of Michigan. Michael met Greg Kurtzer, project lead of Singularity, during his time at GSI and he began contributing heavily to the Singularity project. At the start of summer 2017, Greg hired Michael to work at the ...

  6. The post irradiation examination of fuel in support of Bruce A nuclear division fueling with flow program

    International Nuclear Information System (INIS)

    Montin, J.; Sagat, S.; Day, R.; Novak, J.; Bromfield, H.

    1995-01-01

    Bruce A Nuclear Division (BAND) units are operating at ∼ 75% of full power, because of the potential of a power pulse in the event of an inlet header break. As a result, BAND is converting to fueling with flow, to eliminate the potential of a power pulse and to allow for full-power operation. Concerns regarding the integrity of the end-of-life (EOL) bundles interacting with the latch at the downstream end of the fuel channel were raised. BAND carried out a test program in which EOL bundles in the upstream position 13 of Unit 2 were cascaded into the downstream latch position 1 of another channel. Six of twelve cascaded bundles and two typical EOL position 13 (benchmark) bundles were selected for post-irradiation examination (PIE). Incipient cracks were found in the assembly welds (endplateto-endcap welds) of all six cascaded bundles. No incipient cracks were found in the benchmark bundles. Metallographic and fractographic examination, along with crack dating, and hydrogen and deuterium analyses, indicated that the incipient cracks were the result of delayed-hydride assisted cracking at the EOL. Consequently, Ontario Hydro changed the design of the outlet shield plug to support all three rings of the fuel bundle, to minimize stress and prevent endplate cracking. Also, an ultrasonic endplate inspection tool (UT) was developed and located in the fuel bay. to inspect fuelbundle endplates for cracks. A second test was done involving a series of four bundle cascades in BAND Unit 4 channels that had new outlet shield plugs. The latch bundles were discharged after a hot shutdown. The cascaded Unit 2 and Unit 4 latch bundles were checked for cracks using the UT. The PIE found incipient cracks or less-than-ideal welds in the assembly welds of fuel elements from Unit 2 (latch-supported fuel bundles) that had been identified by the UT as having incipient cracks. No incipient cracks were found in the assembly welds of fuel elements from Unit 4 (new outlet shield

  7. The post-irradiation examination of fuel in support of Bruce A Nuclear Division fueling with flow program

    International Nuclear Information System (INIS)

    Montin, J.; Sagat, S.

    1995-10-01

    Bruce A Nuclear Division (BAND) units are operating at ∼ 75% of full power, because of the potential of a power pulse in the event of an inlet header break. As a result, BAND is converting to fueling with flow, to eliminate the potential of a power pulse and to allow for full-power operation. Concerns regarding the integrity of the end-of-life (EOL) bundles interacting with the latch at the downstream end of the fuel channel were raised. BAND carried out a test program in which EOL bundles in the upstream position of 13 of Unit 2 were cascaded into the downstream latch position 1 of another channel. Six of twelve cascaded bundles and two typical EOL position 13 (benchmark) bundles were selected for post-irradiation examination (PIE). Incipient cracks were found in the benchmark bundles. Metallographic and fractographic examination, along with crack dating, and hydrogen and deuterium analyses, indicated that the incipient cracks were the result of delayed-hydride assisted cracking at the EOL. Consequently, Ontario Hydro changed the design of the outlet shield plug to support all three rings of the fuel bundle, to minimize stress and prevent end plate cracking. Also, an ultrasonic end plate inspection tool (UT) was developed and located in the fuel bay, to inspect fuel-bundle end plates for cracks. A second test was done involving a series of four bundle cascades in BAND Unit 4 channels that had new outlet shield plugs. The latch bundles were discharged after a hot shutdown. The cascaded Unite 2 and Unit 4 latch bundles were checked for cracks using the UT. The PIE found incipient cracks or less-than-ideal welds in the assembly welds of fuel elements from Unit 2 (latch-supported fuel bundles) that had been identified by the UT as having incipient cracks. No incipient cracks were found in the assemble welds of fuel elements from Unit 4 (new outlet shield-supported fuel bundles) confirming the UT results. (author). 5 refs., 8 figs

  8. RELAÇÕES DE PODER ENTRE BISPO E IMPERADOR: uma proposta interpretativa acerca da oficialização do cristianismo a partir de Gregório de Nissa e Teodósio I (século IV

    Directory of Open Access Journals (Sweden)

    Helena Amália PAPA

    Full Text Available RESUMO Este artigo apresenta uma proposta interpretativa alternativa à visão consolidada na historiografia sobre a "oficialização do cristianismo" concedida ao imperador Teodósio I tendo como princípio o favorecimento imperial ao grupo de cristãos nicenos. Durante décadas, a historiografia sobre a Antiguidade Tardia discutiu a relação entre o poder imperial e o cristianismo a partir de interpretações que analisavam os imperadores sob a ótica de uma "cristianização" do Império. Entretanto, desde a primeira década de nosso século, o debate pode ser revisitado a partir de novas problemáticas que consideram diferentes grupos cristãos no século IV, assim como a linha tênue entre os vários cristianismos e suas relações com o poder imperial. A partir da relação de poder entre bispo e imperador, protagonizadas por Gregório de Nissa e Teodósio I, este artigo objetiva analisar um estudo de caso que reflete uma dentre as várias facetas que compunham a proposta de governança político-cultural de Teodósio em relação aos vários cristianismos que compunham o Império Romano daquele espaço e contexto.

  9. Improved operation in CANDU plants with CAN8 PHT pump seals

    International Nuclear Information System (INIS)

    Graham, T.; McInnes, D.; Rhodes, D.

    1997-01-01

    The CAN8 PHT pump seal is currently operating in twenty-one pumps, twelve at Bruce A, seven at Bruce B and in both pumps at Grand Gulf Nuclear Station (GGNS). The CAN8 seal has markedly improved performance over the CAN2 seal previously used at the Bruce stations and the SU seals previously used at GGNS. Details of the performance improvements are discussed. Prior to installation in Bruce B, the CAN8 seal was slightly modified and then demonstrated to be resistant to reverse pressurization failures, since this was a known failure mechanism with the CAN2 seal. Subsequent experience showed that Bruce A was also susceptible to reverse pressure incidents. A review of plant operating procedures at Bruce A showed reverse pressure was likely the initiating factor for several previously unexplained seal disturbances. The reverse pressure failure mechanism is described, as are the improved system operating procedures designed to prevent it. Preventative procedures have now been implemented across Ontario Hydro Nuclear. The ability to track down seal failure mechanisms such as this is greatly enhanced by the improved system monitoring and data retrieval now in place at Bruce A and Bruce B. (author)

  10. Silicon Based Mid Infrared SiGeSn Heterostructure Emitters and Detectors

    Science.gov (United States)

    2016-05-16

    AFRL-AFOSR-JP-TR-2016-0054 Silicon based mid infrared SiGeSn heterostrcture emitters and detectors Greg Sun UNIVERSITY OF MASSACHUSETTS Final Report... Silicon Based Mid Infrared SiGeSn Heterostructure Emitters and Detectors ” February 10, 2016 Principal Investigator: Greg Sun Engineering...diodes are incompatible with the CMOS process and therefore cannot be easily integrated with Si electronics . The GeSn mid IR detectors developed in

  11. Program planning for large-scale control system upgrades

    International Nuclear Information System (INIS)

    Madani, M.; Giajnorio, J.; Richard, T.; Ho, D.; Volk, W.; Ertel, A.

    2011-01-01

    Bruce Power has been planning to replace the Bruce A Fuel Handling (FH) computer systems including the Controller and Protective computers for many years. This is a complex project, requiring an extended FH outage. To minimize operational disruption and fully identify associated project risks, Bruce Power is executing the project in phases starting with the Protective Computer replacement. GEH-C is collaborating with Bruce Power in a Preliminary Engineering (PE) phase to generate a project plan including specifications, budgetary cost, schedule, risks for the Protective computer replacement project. To assist Bruce Power in its evaluation, GEH-C's is using 6-Sigma methodologies to identify and rank Critical to Quality (CTQ) requirements in collaboration with Bruce Power Maintenance, Operations, Plant Design and FH Engineering teams. PE phase established the project scope, hardware and software specifications, material requirements and finally concluded with a recommended hardware platform and approved controls architecture.

  12. 77 FR 65184 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2012-10-25

    ... sent to: Corporation for National and Community Service, Attn.: Bruce Kellogg, 3809C, 1201 New York... through Friday, except Federal holidays. (3) By fax to: (202) 606-3492, Attn.: Bruce Kellogg (4... FURTHER INFORMATION CONTACT: Bruce Kellogg, (202) 606-6954, or by email at [email protected

  13. 77 FR 65183 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2012-10-25

    ...: Corporation for National and Community Service, Attn.: Bruce Kellogg, 3809C, 1201 New York Avenue NW..., except Federal holidays. (3) By fax to: (202) 606-3492, Attn.: Bruce Kellogg. (4) Electronically through... INFORMATION CONTACT: Bruce Kellogg, (202) 606-6954, or by email at [email protected] . SUPPLEMENTARY...

  14. 76 FR 25673 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2011-05-05

    ...: Corporation for National and Community Service, National Service Trust; Attention Bruce Kellogg; 1201 New York... Friday, except Federal holidays. (3) By fax to: (202) 606-3492, Attention: Bruce Kellogg. (4..., Monday through Friday. FOR FURTHER INFORMATION CONTACT: Bruce Kellogg, (202) 606-6954, or by e-mail at...

  15. 76 FR 25672 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2011-05-05

    ... Community Service, National Service Trust; Attention Bruce Kellogg; 1201 New York Avenue, NW., Washington... holidays. (3) By fax to: (202) 606-3492, Attention: Bruce Kellogg. (4) Electronically through the... Friday. FOR FURTHER INFORMATION CONTACT: Bruce Kellogg, (202) 606-6954, or by e-mail at [email protected

  16. Book Reviews

    OpenAIRE

    Redactie KITLV

    2002-01-01

    -Greg Bankoff, Alfred W. McCoy, Lives at the margin; Biography of Filipinos obscure, ordinary and heroic. Madison, Wisconsin: Center for Southeast Asian Studies, University of Wisconsin-Madion, v + 481 pp. -Greg Bankoff, Clive J. Christie, Ideology and revolution in Southeast Asia 1900-1980; Political ideas of the anti-colonial era. Richmond, Surrey: Curzon Press, xi + 236 pp. -René van den Berg, Videa P. de Guzman ,Grammatical analysis; Morphology, syntax, and semantics; Studies in honor of ...

  17. 77 FR 65868 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2012-10-31

    ...: (1) By mail sent to: Corporation for National and Community Service, ATTN: Bruce Kellogg, 8309C, 1201... Time, Monday through Friday, except Federal holidays. (3) By fax to: (202) 606-3492, Bruce Kellogg. (4... FURTHER INFORMATION CONTACT: Bruce Kellogg, (202) 606-6954, or by email at [email protected

  18. 75 FR 67348 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2010-11-02

    ... National and Community Service, National Service Trust; Attention: Bruce Kellogg; 1201 New York Avenue, NW... Federal holidays. (3) By fax to: (202) 606-3484, Attention: Bruce Kellogg. (4) Electronically through the... Friday. FOR FURTHER INFORMATION CONTACT: Bruce Kellogg, (202) 606-6954 or e- mail to [email protected

  19. 75 FR 76408 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2010-12-08

    ... methods: (1) By mail sent to: Corporation for National and Community Service, Attn: Bruce Kellogg, 8309C.... Monday through Friday, except Federal holidays. (3) By fax to: (202) 606-3492 Attn: Bruce Kellogg. (4... FURTHER INFORMATION CONTACT: Bruce Kellogg, (202) 606-6954, or by e-mail at [email protected

  20. 76 FR 66998 - Detroit Edison Company; Notice of Availability of Draft Environmental Impact Statement for a...

    Science.gov (United States)

    2011-10-28

    ...-register to attend or present oral comments at the meetings by contacting Mr. Bruce Olson by telephone at 1... public meetings, the need should be brought to Mr. Bruce Olson's attention no later than December 8, 2011... FURTHER INFORMATION CONTACT: Mr. Bruce Olson, Project Manager, Environmental Projects Branch 2, Division...

  1. AVALIAÇÃO DO PERFIL LIPÍDICO SANGUÍNEO DE ATLETAS CORREDORES NO ENSAIO ERGOESPIROMÉTRICO DE BRUCE UTILIZANDO ESPECTROSCOPIA NO INFRAVERMELHO

    Directory of Open Access Journals (Sweden)

    Francielle Pasqualotti Meinhardt

    2011-08-01

    Full Text Available Os constituintes do perfil lipídico são importantes marcadores bioquímicos de doenças cardiovasculares (grande causa de morbidade e mortalidade. Para um diagnóstico de alterações do perfil lipídico se apresenta o método da espectroscopia no infravermelho (FT-IR. Este estudo avalia a aplicação da FT-IR na obtenção de dados do perfil lipídico de atletas corredores. Trata-se de um estudo analítico observacional comparativo, tendo como método de referência os ensaios enzimáticos baseados na reação de Trinder, comparados à espectroscopia no infravermelho por reflectância difusa com Transformada de Fourier (DRIFTS, com auxílio das ferramentas quimiométricas de análise exploratória por agrupamento hierárquico (HCA e análise preditiva por mínimos quadrados parciais (PLS para previsão destes marcadores bioquímicos. Foram sujeitos 14 atletas da equipe de Atletismo da UNISC, de 18 a 30 anos, de ambos os sexos, avaliados em repouso e após o teste ergoespirométrico de Bruce. Os resultados apontam que, na avaliação de atletas, a técnica de infravermelho (DRIFTS juntamente com o PLS, foi adequada para a construção de modelos de calibração e na definição da correlação entre testes bioquímicos padrões no perfil lipídico e na determinação pelo infravermelho.

  2. Annual report, 1978

    International Nuclear Information System (INIS)

    1979-04-01

    In 1978, for the first time, nuclear generators supplied more electricity than coal-fired units: 30 percent of the total compared with 28 percent for coal. Energy demand in Ontario was up by 2.7 percent. No new commitments for generating stations were made, and work on committed stations was to be slowed until the generation expansion program had been fully reviewed. Atomic Energy of Canada Ltd. and Ontario Hydro have agreed to develop a nuclear wastes demonstration facility. The Select Committee of the Ontario Legislature on Ontario Hydro affairs investigated the costs of the Bruce heavy water plants and found no evidence of mismanagement. The Royal Commission on Electric Power Planning issued an interim report on nuclear power which recognized the need for and safety of the CANDU system. Reactors at Pickering and Bruce achieved an overall capacity factor of 81 percent. The third Bruce A unit was started up. Work on Bruce B and Pickering B was well underway. Bruce Heavy Water Plant B was virtually complete, but work was stopped on the second half of the Bruce D plant. Plans for the first half of Bruce D will be reviewed. Site preparation and excavation continued for the Darlington generating station. (LL)

  3. Peter Holland: a pioneer of occupational medicine.

    OpenAIRE

    Murray, R

    1992-01-01

    The earliest recorded occupational health service in this country was that established in a cotton spinning factory at Quarry Bank Mill in Cheshire. The mill was built in 1784 by Samuel Greg and his partners. They employed local labour and also some parish apprentices. Happily, Samuel Greg was a good christian and, having created a modern factory and a model village with a church and a school, he was equally concerned for the physical welfare of his employees. Accordingly, he appointed a doct...

  4. Three new species of Begonia (Begoniaceae) from Bahia, Brazil.

    Science.gov (United States)

    Gregório, Bernarda de Souza; Costa, Jorge Antonio Silva; Rapini, Alessandro

    2015-01-01

    The taxonomic treatment of Begoniaceae for the state of Bahia, Brazil, led to the recognition of three new species of Begonia with narrow distributions, which are described and illustrated here: Begoniadelicata Gregório & J.A.S. Costa, sp. nov. is a herb restricted to the region of the Recôncavo; Begoniaelianeae Gregório & J.A.S. Costa, sp. nov. is a shrub endemic to the Atlantic forest of the southern part of the state; and Begoniapaganuccii Gregório & J.A.S. Costa, sp. nov. is a subshrub known only from the type material, collected in the Piedmont of Paraguaçu. Notes on morphology, comparisons with morphologically similar species, etymology, geographic distribution, habitat and phenological data for each species are also presented. Furthermore, keys are provided as an aid to separating the new species from congeneric species that occur in their surroundings. Due to the sparse knowledge of the new species, there is as yet insufficient data to accurately assess their conservation status.

  5. 77 FR 60026 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-10-01

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas... INFORMATION CONTACT: Requests for additional information or copies should be directed to Bruce A. Sharp...

  6. 78 FR 21706 - Proposed Collection; Comment Request

    Science.gov (United States)

    2013-04-11

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas... INFORMATION CONTACT: Requests for additional information or copies should be directed to Bruce A. Sharp...

  7. 78 FR 59425 - Proposed Collection: Comment Request

    Science.gov (United States)

    2013-09-26

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... Service, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov... INFORMATION CONTACT: Requests for additional information or copies should be directed to Bruce A. Sharp...

  8. 77 FR 19424 - Proposed Collection; Comment Request

    Science.gov (United States)

    2012-03-30

    ..., as required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A..., Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The...: Requests for additional information or copies should be directed to Bruce A. Sharp, Bureau of the Public...

  9. 77 FR 32180 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-05-31

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd... INFORMATION CONTACT: Requests for additional information or copies should be directed to Bruce A. Sharp...

  10. Leadership Actions to Improve Nuclear Safety Culture

    International Nuclear Information System (INIS)

    Clewett, L.K.

    2016-01-01

    The challenge many leaders face is how to effectively implement and then utilise the results of Safety Culture surveys. Bruce Power has recently successfully implemented changes to the Safety Culture survey process including how corrective actions were identified and implemented. The actions taken in response to the latest survey have proven effective with step change performance noted. Nuclear Safety is a core value for Bruce Power. Nuclear Safety at Bruce Power is based on the following four pillars: reactor safety, industrial safety, radiological safety and environmental safety. Processes and practices are in place to achieve a healthy Nuclear Safety Culture within Bruce Power such that nuclear safety is the overriding priority. This governance is based on industry leading practices which monitor, asses and take action to drive continual improvements in the Nuclear Safety Culture within Bruce Power.

  11. The case for new nuclear

    International Nuclear Information System (INIS)

    Luxat, J.C.

    2013-01-01

    Over a 22 year period from 1971 to 1993 a total of 20 reactor units were brought into service - an average of approximately one unit per year. Ontario Hydro constructed the four-unit Pickering A station, four units at Bruce A, four units at Pickering B, four units at Bruce B and four units at Darlington during this period. This represents a capacity of nearly 14,000 MW, as shown in Figure 1. During this period there was a large increase in industrial capacity in Ontario, particularly in manufacturing, driven in large measure by the incentives offered by low electricity prices, skilled workers and a good health care system. Subsequently in the mid-1990's the Pickering A and Bruce A units were laid up and maintenance efforts were focused on the Pickering B, Bruce B and Darlington stations. Two of the four units at Pickering A were returned to service in the early 2000's and the four units of Bruce A were returned to service with two units being refurbished. By 2010 nuclear capacity in the province had returned to 12,800 MW. The Ontario Long Term Energy Plan (LTEP) announced at the beginning of December does not include new build nuclear but does include refurbishment of the Darlington station as well as two units at Bruce A and four units at Bruce B. The six units at Pickering will be shut down by 2020. As shown in Figure 1, this will reduce the nuclear capacity from the current 12,800 MW to 8000 MW when the Pickering A and B units are removed from service in 2020 and the refurbishment of Darlington and Bruce units proceeds starting in 2016 and projected to complete by 2031. This will be the lowest nuclear generating capacity in the province since 1985. (author)

  12. 78 FR 75549 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2013-12-12

    ... Community Service, Attention Bruce Kellogg, 8309C, 1201 New York Avenue NW., Washington, DC 20525. (2) By... FURTHER INFORMATION CONTACT: Bruce Kellogg, (202) 606-6954, or by email at [email protected

  13. 76 FR 77855 - Detroit Edison Company; Notice of Availability of Errata Sheet for the Draft Environmental Impact...

    Science.gov (United States)

    2011-12-14

    ... Information Contact: Mr. Bruce Olson, Project manager, Environmental Projects Branch 2, Division of New.... Telephone: (301) 415-3731; email: Bruce.Olson@nrc.gov . Dated at Rockville, Maryland, this 7th day of...

  14. Stemcell Information: SKIP000794 [SKIP Stemcell Database[Archive

    Lifescience Database Archive (English)

    Full Text Available the Bruce Rappaport Faculty of Medicine, Technion -Israel Institute of Technology Sohnis Family Reserch Labo...ratory for Cardiac Electrophysiology and Regenerative Medicine, the Bruce Rappaport Faculty of Medicine, Technion -Israel

  15. 75 FR 65456 - Information Collection; Submission for OMB Emergency Review

    Science.gov (United States)

    2010-10-25

    ... Corporation for National and Community Service, Bruce Kellogg, (202) 606-6954, or by e-mail at [email protected] Therefore, there will be no comment period for this request. FOR FURTHER INFORMATION CONTACT: Bruce Kellogg...

  16. Steps to Advanced CANDU 600

    International Nuclear Information System (INIS)

    Oh, Yongshick; Brooks, G. L.

    1988-01-01

    The CANDU nuclear power system was developed from merging of AECL heavy water reactor technology with Ontario Hydro electrical power station expertise. The original four units of Ontario Hydro's Pickering Generating Station are the first full-scale commercial application of the CANDU system. AECL and Ontario Hydro then moved to the next evolutionary step, a more advanced larger scale design for four units at the Bruce Generating Station. CANDU 600 followed as a single unit nuclear electric power station design derived from an amalgam of features of the multiple unit Pickering and Bruce designs. The design of the CANDU 600 nuclear steam supply system is based on the Pickering design with improvements derived from the Bruce design. For example, most CANDU 600 auxiliary systems are based on Bruce systems, whereas the fuel handling system is based on the Pickering system. Four CANDU 600 units are in operation, and five are under construction in Romania. For the additional four units at Pickering Generating Station 'B', Ontario Hydro selected a replica of the Pickering 'A' design with limited design changes to maintain a high level of standardization across all eight units. Ontario Hydro applied a similar policy for the additional four units at Bruce Generating Station 'B'. For the four unit Darlington station, Ontario Hydro selected a design based on Bruce with improvements derived from operating experience, the CANDU 600 design and development programs

  17. [Strive, plan and reach the "Summit": the Faculty Development Program at the Ruth & Bruce Rappaport Faculty of Medicine, Technion, Israel Institute of Technology].

    Science.gov (United States)

    Castel, Orit Cohen; Nave, Rachel; Ganor, Margalit; Hasson-Gilad, Dalia R; Brika, Riva

    2010-04-01

    In recent years, faculty development has turned into a central component of medical education and a primary instrument in qualifying physicians to be teachers and educators. The faculty development program at the Ruth & Bruce Rappaport Faculty of Medicine ("Summit" program) was established in order to improve teaching of the clinical professions, to create a community of medical teachers and educators and to develop leadership in medical education within the Faculty of Medicine. This article aims to describe the design, implementation and evaluation of the faculty development program in the Technion's Faculty of Medicine. The program was designed for a group of 20 clinical teachers, of various clinical professions, who had gained at least one year of undergraduate teaching experience and wished to develop a career in medical education. The program included seven monthly, eight-hour meetings throughout the academic year. Learning was based on small group discussions, interactive exercises, role-plays and simulations, self-directed reading and reflective writing. At the end of the final meeting, participants completed an evaluation form. Seventeen of the 20 participants (85%) graduated and received certificates. Learners' overall satisfaction was high. Graduates expressed high motivation to practice medical education within the Faculty of Medicine and reported that they gained new knowledge in medical education and skills regarding various aspects of teaching and learning, such as formulation of learning objectives, designing role plays, and providing effective feedback. The "Summit" program is an innovative initiative in the field of medical education in Israel. The program had a significant impact on participants' knowledge, teaching skills and attitudes. In order to ensure implementation of the acquired tools and skills, its shortterm and long-term effects on teaching behavior and the learning climate have yet to be demonstrated. In addition, it is necessary to

  18. Doing More with Less The New Way to Wealth

    CERN Document Server

    Piasecki, Bruce

    2012-01-01

    "Bruce Piasecki redefines what winning looks like for all of us."-GERALD BRESNICK, Vice President of Environment, Health & Safety and Social Responsibility, Hess "Bruce Piasecki has created a book about discovering and maintaining wealth that, in fact, redefines wealth itself to include much more than mere numbers in a bank account." -JAY PARINI, bestselling author of The Last Station and The Passages of H.M. "Bruce Piasecki is one of the few thinkers really upping the ante for leaders in business and society."-JAMES HOWARD KUNSTLER, bestselling author of The Long Emergency and The Geograph

  19. German General Staff Officer Education and Current Challenges

    Science.gov (United States)

    2006-05-25

    Dempsey, Fool’s Errands: America’s Recent Encounters with Nation Building, Washington, D.C. 2001; Bruce R. Pirnie, and Corazon M. Francisco, Assessing...problems in American military history, Boston, 1999. Pirnie, Bruce R., and Corazon M. Francisco, Assessing requirements for peacekeeping

  20. 77 FR 59004 - Membership of the Senior Executive Service Standing Performance Review Boards

    Science.gov (United States)

    2012-09-25

    ..., MELODEE PRINCIPAL DEPUTY ADMINISTRATOR, OFFICE OF JUVENILE JUSTICE AND DELINQUENCY PREVENTION. FEUCHT.... SABOL, WILLIAM DEPUTY DIRECTOR, BUREAU OF JUSTICE STATISTICS. RIDGEWAY, GREG DEPUTY DIRECTOR, NATIONAL...

  1. A STUDY OF TUNJI SOTIMIRIN'S MOLUE Greg Mbajiorgu Abstr

    African Journals Online (AJOL)

    user

    that relied squarely on music and movements. (Ogunyemi, Oral Interview ... comedian who can hold his own in the entertainment industry in. Nigeria”. Sotimirin is also .... seat, collecting money from passengers, issuing tickets and announcing ...

  2. Evolution of the U.S. Army aviation during Operation Enduring Freedom in Afghanistan

    Science.gov (United States)

    2015-06-12

    40 Bruce L. Berg and Howard Lune , Qualitative Research Methods for the Social Sciences (Boston, MA: Pearson, 2004...a Time of War.” Monograph, School of Advanced Military Studies, 2006. Berg, Bruce L., and Howard Lune . Qualitative Research Methods for the Social

  3. BNGS B valve packing program

    International Nuclear Information System (INIS)

    Cumming, D.

    1995-01-01

    The Bruce B Valve Packing Program began in 1987. The early history and development were presented at the 1992 International CANDU Maintenance conference. This presentation covers the evolution of the Bruce B Valve Packing Program over the period 1992 to 1995. (author)

  4. 75 FR 24702 - Notice of Agreements Filed

    Science.gov (United States)

    2010-05-05

    ... Bay International Terminals, Inc. Operating Agreement. Parties: Tampa Bay International Terminals, Inc. and Tampa Port Authority. Filing Parties: Greg Lovelace, Director Cargo & Cruise Marketing; Tampa Port...

  5. 77 FR 65182 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2012-10-25

    ... following methods: (1) By mail sent to: Corporation for National and Community Service, Attn.: Bruce Kellogg... Kellogg. (4) Electronically through www.regulations.gov . Individuals who use a telecommunications device... through Friday. FOR FURTHER INFORMATION CONTACT: Bruce Kellogg, (202) 606-6954, or by email at bkellogg...

  6. Cardiac magnetic resonance imaging

    African Journals Online (AJOL)

    2011-03-06

    Mar 6, 2011 ... Cardiac magnetic resonance imaging. Cardiovascular magnetic resonance imaging is becoming a routine diagnostic technique. BRUCE s sPOTTiswOOdE, PhD. MRC/UCT Medical Imaging Research Unit, University of Cape Town, and Division of Radiology, Stellenbosch University. Bruce Spottiswoode ...

  7. 78 FR 56930 - Membership of the Senior Executive Service Standing Performance Review Boards

    Science.gov (United States)

    2013-09-16

    ... OF JUVENILE JUSTICE AND DELINQUENCY PREVENTION. FEUCHT, THOMAS E EXECUTIVE SCIENCE ADVISOR, NATIONAL... JUSTICE STATISTICS. RIDGEWAY, GREG DEPUTY DIRECTOR, NATIONAL INSTITUTE OF JUSTICE, OFFICE OF SCIENCE AND...

  8. Senine juhtimine ei tööta : inimeste otsuste taga on emotsioon, mitte loogika / Veigo Kell

    Index Scriptorium Estoniae

    Kell, Veigo

    2012-01-01

    Ebaratsionaalsest käitumisest otsustamisel, efektiivsusest, motivatsioonist. Ülevaateid Adam Smithi, Pete Lunni, David Rocki, Dan Ariely, Greg Smithi, Gary Hameli, Charles Jacobsi ja Daniel Kahnemani juhtimisraamatutest

  9. A new species of the genus Linuparus (Crustacea, Palinuridae) from South-East Africa

    NARCIS (Netherlands)

    Berry, P.F.; George, R.W.

    1972-01-01

    INTRODUCTION The genus Linuparus White was recently reviewed by Bruce (1965) who gave an excellent account of two species, the type species L. trigonus (Von Siebold) and a previously undescribed species L. sordidus Bruce from the South China Sea. George & Main (1967) reviewed the family Palinuridae

  10. Business risk management

    International Nuclear Information System (INIS)

    Cosby, C.

    2015-01-01

    Bruce Power's definition: an emerging and demonstrable event or change in business plan assumptions that could impact Bruce Power's achievement of its business plan objectives and results. Risks can be either negative (threats) or positive (opportunities). Risks against the 5 year business plan Net Risk = impact * probability.

  11. 76 FR 22157 - Postal Service Rate Adjustment

    Science.gov (United States)

    2011-04-20

    ... identifies Greg Dawson, Manager of Pricing Strategy, as the official responsible for responding to any... program is an example of the increased pricing flexibility under the Postal Accountability and Enhancement...

  12. 78 FR 9694 - Agency Information Collection Activities; Proposed Collection; Comment Request; MyGov

    Science.gov (United States)

    2013-02-11

    ... business confidential information provided. FOR FURTHER INFORMATION CONTACT: Mr. Greg Gershman... is architected as a series of applications built on an open platform, not unlike a Facebook or iPhone...

  13. Moodsa kunsti järeleaitamistund / Heie Treier

    Index Scriptorium Estoniae

    Treier, Heie, 1963-

    1998-01-01

    Bruce Naumani näitus 'Kiasmas' Helsingis 24. jaanuarini 1999. Majandusajakiri 'Capital' paigutab B. Naumani maailma kunstnike top 100-s esimesele kohale. Bruce Naumanist (s. 1941 USA-s Indiana osariigis), tema filmidest, videotest, videoinstallatsioonidest, konkreetsetest töödest. Neoonsõnumitest, nende võrdlus Jenny Holzeri töödega.

  14. Business risk management

    Energy Technology Data Exchange (ETDEWEB)

    Cosby, C., E-mail: Christine.cosby@brucepower.com [Bruce Power, Tiverton, ON (Canada)

    2015-07-01

    Bruce Power's definition: an emerging and demonstrable event or change in business plan assumptions that could impact Bruce Power's achievement of its business plan objectives and results. Risks can be either negative (threats) or positive (opportunities). Risks against the 5 year business plan Net Risk = impact * probability.

  15. Utility-vendor partnerships for refurbishment projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, G.; Hall, H. [Bruce Power, Tiverton, Ontario (Canada)

    2012-07-01

    Through the course of normal operation of the six (6) Bruce Power units, the quality of plant modifications has from time to time resulted in extensive rework, additional cost and significant unit generation schedule delays. This has impacted Bruce Power’s ability to successfully deliver our capital improvement program, generation plan and therefore our business plan. More recently, the restart of Units 1 and 2 have exhibited this same issue however in a more intensive manner due to the large number of Structures, Systems and Components (SSC) being brought into service. As such Bruce Power has and will continue to take steps to bolster its Quality Assurance and Control provisions as necessary to ensure that upgrades to our stations work first time and every time. Part of this enhanced focus involves the upfront Engineering Change Control (ECC) process and from this perspective it is imperative that these modifications meet and/or exceed the provisions within the Bruce Power ECC requirements, including the quality gates associated with the key milestones within this protocol. As such Bruce Power has and will continue to hold training sessions with our key Vendors to ensure that these requirements are clear since this shall determine the nature of our future working relationship. For Vendors who adhere to these requirements, support will continue to be requested and for cases where they do not, services will be suspended. By extension, services provided in support of field work will similarly be monitored and screened with the same objective, high quality installations must become the standard rather than the exception and special steps have identified and are being implemented to improve the performance in this area of our business. In aggregate the above theme is consistent with a continuous improvement perspective and in recognition that not all services provided by our current Vendor base are of equivalent quality. Bruce Power understands that we must work

  16. Utility-vendor partnerships for refurbishment projects

    International Nuclear Information System (INIS)

    Newman, G.; Hall, H.

    2012-01-01

    Through the course of normal operation of the six (6) Bruce Power units, the quality of plant modifications has from time to time resulted in extensive rework, additional cost and significant unit generation schedule delays. This has impacted Bruce Power’s ability to successfully deliver our capital improvement program, generation plan and therefore our business plan. More recently, the restart of Units 1 and 2 have exhibited this same issue however in a more intensive manner due to the large number of Structures, Systems and Components (SSC) being brought into service. As such Bruce Power has and will continue to take steps to bolster its Quality Assurance and Control provisions as necessary to ensure that upgrades to our stations work first time and every time. Part of this enhanced focus involves the upfront Engineering Change Control (ECC) process and from this perspective it is imperative that these modifications meet and/or exceed the provisions within the Bruce Power ECC requirements, including the quality gates associated with the key milestones within this protocol. As such Bruce Power has and will continue to hold training sessions with our key Vendors to ensure that these requirements are clear since this shall determine the nature of our future working relationship. For Vendors who adhere to these requirements, support will continue to be requested and for cases where they do not, services will be suspended. By extension, services provided in support of field work will similarly be monitored and screened with the same objective, high quality installations must become the standard rather than the exception and special steps have identified and are being implemented to improve the performance in this area of our business. In aggregate the above theme is consistent with a continuous improvement perspective and in recognition that not all services provided by our current Vendor base are of equivalent quality. Bruce Power understands that we must work

  17. Louisiana Coastal Marsh Vegetative Type (poly), Geographic NAD83, LDWF (2001) [marsh_veg_type_poly_LDWF_2001

    Data.gov (United States)

    Louisiana Geographic Information Center — This data set contains vector line information. The original data set was collected through visual field observation by Greg Linscombe of LDWF and Robert H. Chabreck...

  18. Louisiana Coastal Marsh Vegetative Type, Geographic NAD83, LDWF (2001) [marsh_veg_type_pts_LDWF_2001

    Data.gov (United States)

    Louisiana Geographic Information Center — This data set contains vector point information. The orignal data set was collected through visual field observation by Greg Linscombe of LDWF and Robert H. Chabreck...

  19. Marion L. Williams Interview (MORS)

    OpenAIRE

    Williams, Marion L.

    2015-01-01

    Interviewers: Keethler, Greg; Sheldon, Robert S.. Interview location(s): Headquarters Air Force Operational Test and Evaluation Center, Kirkland Air Force Base, New Mexico and United States Air Force Academy, Colorado Springs, Colorado

  20. Genomic characterisation of Arachis porphyrocalyx (Valls & C.E. Simpson, 2005) (Leguminosae): multiple origin of Arachis species with x = 9

    Science.gov (United States)

    Celeste, Silvestri María; Ortiz, Alejandra Marcela; Robledo, Germán Ariel; Valls, José Francisco Montenegro; Lavia, Graciela Inés

    2017-01-01

    Abstract The genus Arachis Linnaeus, 1753 comprises four species with x = 9, three belong to the section Arachis: Arachis praecox (Krapov. W.C. Greg. & Valls, 1994), Arachis palustris (Krapov. W.C. Greg. & Valls, 1994) and Arachis decora (Krapov. W.C. Greg. & Valls, 1994) and only one belongs to the section Erectoides: Arachis porphyrocalyx (Valls & C.E. Simpson, 2005). Recently, the x = 9 species of section Arachis have been assigned to G genome, the latest described so far. The genomic relationship of Arachis porphyrocalyx with these species is controversial. In the present work, we carried out a karyotypic characterisation of Arachis porphyrocalyx to evaluate its genomic structure and analyse the origin of all x = 9 Arachis species. Arachis porphyrocalyx showed a karyotype formula of 14m+4st, one pair of A chromosomes, satellited chromosomes type 8, one pair of 45S rDNA sites in the SAT chromosomes, one pair of 5S rDNA sites and pericentromeric C-DAPI+ bands in all chromosomes. Karyotype structure indicates that Arachis porphyrocalyx does not share the same genome type with the other three x = 9 species and neither with the remaining Erectoides species. Taking into account the geographic distribution, morphological and cytogenetic features, the origin of species with x = 9 of the genus Arachis cannot be unique; instead, they originated at least twice in the evolutionary history of the genus. PMID:28919947

  1. 78 FR 71038 - Proposed Collection: Resolution for Transactions Involving Treasury Securities

    Science.gov (United States)

    2013-11-27

    ... U.S.C. 3506(c)(2)(A). Currently the Bureau of the Fiscal Service within the Department of the.... ADDRESSES: Direct all written comments to Bureau of the Fiscal Service, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments...

  2. It's Time for a National Energy Security Strategy

    National Research Council Canada - National Science Library

    Wright, George G

    2008-01-01

    .... can preserve that standing in the world. Colonel Greg Wright argues that what is needed to retain our military and economic superpower advantage is a new overarching United States National Energy Security Strategy...

  3. 77 FR 13175 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-03-05

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also available at...

  4. 77 FR 65248 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-10-25

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... consideration. ADDRESSES: Direct all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments...

  5. 77 FR 31689 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2012-05-29

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the.... Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity...: Requests for additional information or copies should be directed to Bruce A. Sharp, Bureau of the Public...

  6. 77 FR 69548 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-11-19

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also available at www.pracomment...

  7. 77 FR 32179 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-05-31

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... of consideration. ADDRESSES: Direct all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to...

  8. 77 FR 43430 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-07-24

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... consideration. ADDRESSES: Direct all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments...

  9. 77 FR 19057 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-03-29

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also available at www...

  10. 77 FR 32181 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-05-31

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently the... of consideration. ADDRESSES: Direct all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to...

  11. 78 FR 34161 - Proposed Collection: Comment Request

    Science.gov (United States)

    2013-06-06

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the...: Direct all written comments to Bureau of the Fiscal Service, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also...

  12. 78 FR 25534 - Proposed Collection; Comment Request

    Science.gov (United States)

    2013-05-01

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also available at www.pracomment...

  13. 77 FR 19058 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-03-29

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the...: Direct all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also...

  14. 77 FR 32178 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-05-31

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also available at www...

  15. 76 FR 26802 - Proposed Collection: Comment Request

    Science.gov (United States)

    2011-05-09

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street, Avery 4-A, Parkersburg, WV 26106- 5312, or e-mail to Bruce.Sharp@bpd.treas.gov FOR FURTHER INFORMATION CONTACT: Requests for additional...

  16. 76 FR 26801 - Proposed Collection: Comment Request

    Science.gov (United States)

    2011-05-09

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street, Avery 4-A, Parkersburg, WV 26106- 5312, or e-mail to Bruce.Sharp@bpd.treas.gov . FOR FURTHER INFORMATION CONTACT: Requests for additional...

  17. 76 FR 61479 - Proposed Collection: Comment Request

    Science.gov (United States)

    2011-10-04

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also available at...

  18. 77 FR 74053 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-12-12

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... consideration. ADDRESSES: Direct all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments...

  19. 78 FR 22040 - Proposed Collection; Comment Request

    Science.gov (United States)

    2013-04-12

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently the... Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also available at www.pracomment.gov...

  20. 77 FR 13176 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-03-05

    ... 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the Bureau of the Public Debt within the Department of the.... Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity...: Requests for additional information or copies should be directed to Bruce A. Sharp, Bureau of the Public...

  1. 77 FR 19754 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-04-02

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also...

  2. 78 FR 60376 - Proposed Collection: Direct Deposit Sign-Up Form

    Science.gov (United States)

    2013-10-01

    ..., as required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A... Fiscal Service, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.... Sharp, Bureau of the Fiscal Service, 200 Third Street A4-A, Parkersburg, WV 26106-1328, (304) 480- 8150...

  3. 78 FR 25535 - Proposed Collection; Comment Request

    Science.gov (United States)

    2013-05-01

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also available at...

  4. 77 FR 5090 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-02-01

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently the... all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also...

  5. 78 FR 149 - Proposed Collection: Comment Request

    Science.gov (United States)

    2013-01-02

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... consideration. ADDRESSES: Direct all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments...

  6. 78 FR 341 - Proposed Information Collection; Comment Request

    Science.gov (United States)

    2013-01-03

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also...

  7. 78 FR 63309 - Proposed Collection: Information Collected Through Investigative Inquiry Forms

    Science.gov (United States)

    2013-10-23

    ... U.S.C. 3506(c)(2)(A). Currently the Bureau of the Fiscal Service within the Department of the...: Direct all written comments to Bureau of the Fiscal Service, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also...

  8. Avaliação do perfil lipídico sanguíneo de atletas corredores no ensaio ergoespirométrico de bruce utilizando espectroscopia no infrevermelho

    Directory of Open Access Journals (Sweden)

    Francielle Pasqualotti Meinhardt

    2011-09-01

    Full Text Available Os constituintes do perfil lipídico compõem o sangue e são importantes marcadores bioquímicos de doenças cardiovasculares, que é reconhecida como grande causa de morbidade e mortalidade. Para um diagnóstico mais amplo das possíveis alterações do perfil lipídico se apresenta o método da espectroscopia no infravermelho (FTIR que consiste de uma técnica analítica que envolve a identificação de misturas complexas. Este estudo tem como objetivo avaliar a aplicação da espectroscopia de infravermelho na obtenção de dados do perfil lipídico de atletas corredores. Trata-se de um estudo analítico observacional comparativo, tendo como método de referência os ensaios enzimáticos baseados na reação de Trinder, comparados à espectroscopia no infravermelho por reflectância difusa com Transformada de Fourier (DRIFTS, com auxílio das ferramentas quimiométricas de análise exploratória por agrupamento hierárquico (HCA e análise preditiva por mínimos quadrados parciais (PLS para previsão destes marcadores bioquímicos. Foram sujeitos 14 atletas da equipe de Atletismo da UNISC, de 18 a 30 anos, de ambos os sexos, avaliados em repouso e após o teste ergoespirométrico de Bruce. Os resultados apontam que, na avaliação de atletas, a técnica de infravermelho (DRIFTS juntamente com o PLS, foi adequada para a construção de modelos de calibração e na definição da correlação entre testes bioquímicos padrões no perfil lipídico e na determinação pelo infravermelho. Nessa perspectiva, considera-se possível a utilização da FTIR na obtenção de dados que determina o perfil lipídico em amostras de sangue total em atletas.

  9. 2006 Program of Study: Ice

    National Research Council Canada - National Science Library

    Balmforth, Neil J; Wettlaufer, John S; Worster, Grae

    2007-01-01

    .... Towards the end of Grae's lectures, we also held the 2006 GFD Public Lecture. This was given by Greg Dash of the University of Washington, on matters of ice physics and a well known popularization...

  10. Um pintor na Ordem de São Gregório

    Directory of Open Access Journals (Sweden)

    Godiva Accioly

    2015-06-01

    Full Text Available O projeto de escrever sobre arte e religião está centrado em Carlos Oswald (1882-1971, artista que se perpetuou por sua singularidade e posição histórica no contexto das artes, da educação, da religião. Esse artista e sua obra – focalizando-se neste texto a realizada no campo da arte sacra – compõem o tema do presente estudo da arte e da religião. Incluem-se, no trabalho ora apresentado, os laços tecidos entre a atuação do artista e a Igreja Católica, nas primeiras décadas do século XX. A partir da história de vida de Carlos Oswald, da qual se destacaram os anos de formação, buscou-se compreender o significado de seu trabalho artístico na constituição de uma orientação católica sobre as relações entre a arte sacra, cultura e educação brasileiras.

  11. Calibration of the Wedge Prism

    Science.gov (United States)

    Charles B. Briscoe

    1957-01-01

    Since the introduction of plotless cruising in this country by Grosenbaugh and the later suggestion of using a wedge prism as an angle gauge by Bruce this method of determining basal area has been widely adopted in the South. One of the factors contributing to the occasionally unsatisfactory results obtained is failure to calibrate the prism used. As noted by Bruce the...

  12. 77 FR 38394 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-06-27

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the... of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp.... Sharp, Bureau of the Public Debt, 200 Third Street A4-A, Parkersburg, WV 26106-1328, (304) 480-8150...

  13. 77 FR 69547 - Proposed Collection: Comment Request

    Science.gov (United States)

    2012-11-19

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the.... ADDRESSES: Direct all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also...

  14. 78 FR 25533 - Proposed Collection; Comment Request

    Science.gov (United States)

    2013-05-01

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A). Currently the.... ADDRESSES: Direct all written comments to Bureau of the Public Debt, Bruce A. Sharp, 200 Third Street A4-A, Parkersburg, WV 26106-1328, or bruce.sharp@bpd.treas.gov . The opportunity to make comments online is also...

  15. Work program analysis - defining the capability/risk plan

    International Nuclear Information System (INIS)

    Hrinivich, W.A.

    2004-01-01

    Bruce Power has developed and implemented an analysis methodology (Work Program Analysis) to assess and address corporate business risk associated with work group capability. Work Program Analysis is proving to be an excellent tool for identifying and supporting key business decisions facing the line and senior management at Bruce Power. The following describes the methodology, its application and the results achieved. (author)

  16. Genetic Underpinnings of Alopecia Areata

    Medline Plus

    Full Text Available ... Liaison Greg Lavine Writer/Editor (301) 496-8190 Newsletters Stay informed by subscribing to the NIAMS e- ... espanol Community Outreach Initiative Subscribe to Our E-Newsletters Get the latest scientific news and resources on ...

  17. 75 FR 18014 - Federal Highway Administration

    Science.gov (United States)

    2010-04-08

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Availability regarding a Finding of No Significant Impact (FONSI): U.S.... FOR FURTHER INFORMATION CONTACT: Federal Highway Administration, Kentucky Division: Mr. Greg Rawlings...

  18. A Lifetime's Adventure in Extracellular K+ Regulation: The Scottish Connection.

    Science.gov (United States)

    Brown, Angus M

    2017-09-01

    In a career that has spanned 45 years and shows no signs of slowing down, Dr Bruce Ransom has devoted considerable time and energy to studying regulation of interstitial K + . When Bruce commenced his studies in 1969 virtually nothing was known of the functions of glial cells, but Bruce's research contributed to the physiological assignation of function to mammalian astrocytes, namely interstitial K + buffering. The experiments that I describe in this review concern the response of the membrane potential (Em) of in vivo cat cortical astrocytes to changes in [K + ] o , an experimental manoeuvre that was achieved in two different ways. The first involved recording the Em of an astrocyte while the initial aCSF was switched to one with different K + , whereas in the second series of experiments the cortex was stimulated and the response of the astrocyte Em to the K + released from neighbouring neurons was recorded. The astrocytes responded in a qualitatively predictable manner, but quantitatively the changes were not as predicted by the Nernst equation. Elevations in interstitial K + are not sustained and K + returns to baseline rapidly due to the buffering capacity of astrocytes, a phenomenon studied by Bruce, and his son Chris, published 27 years after Bruce's initial publications. Thus, a lifetime spent investigating K + buffering has seen enormous advances in glial research, from the time cells were identified as 'presumed' glial cells or 'silent cells', to the present day, where glial cells are recognised as contributing to every important physiological brain function.

  19. Protecting America Through Better Civic Education

    Science.gov (United States)

    2013-09-01

    Studies NEA National Education Association NFTE Network for Teaching Entrepreneurship NGA National Governors Association PD#8 Presidential Directive 8...Porter, USN, who inspired me through his work, A National Strategic Narrative, with his thoughts on the intellectual capital of America, our youth—a...7 Bruce Bongar, “Defining the Need and Dexcribing the Goal,” in Psychology of Terrorism, ed. Bruce Bongar, Lisa M

  20. Thermal gradients caused by the CANDU moderator circulation

    International Nuclear Information System (INIS)

    Mohindra, V.K.; Vartolomei, M.A.; Scharfenberg, R.

    2008-01-01

    The heavy water moderator circulation system of a CANDU reactor, maintains calandria moderator temperature at power-dependent design values. The temperature differentials between the moderator and the cooler heavy water entering the calandria generate thermal gradients in the reflector and moderator. The resultant small changes in thermal neutron population are detected by the out-of-core ion chambers as small, continuous fluctuations of the Log Rate signals. The impact of the thermal gradients on the frequency of the High Log Rate fluctuations and their amplitude is relatively more pronounced for Bruce A as compared to Bruce B reactors. The root cause of the Log Rate fluctuations was investigated using Bruce Power operating plant information data and the results of the investigation support the interpretation based on the thermal gradient phenomenon. (author)

  1. 78 FR 49296 - NASA International Space Station Advisory Committee; Meeting

    Science.gov (United States)

    2013-08-13

    .... Greg Mann, Office of International and Interagency Relations, (202) 358-5140, NASA Headquarters... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 13-091] NASA International Space Station... meeting. SUMMARY: In accordance with the Federal Advisory Committee Act, Public Law 92-463, as amended...

  2. Jõulud pargis

    Index Scriptorium Estoniae

    2004-01-01

    Taanis Gisselfeldi kloostri juurde kuuluvas häärberis pakuvad arhitektid Stig Lauritsen ja Greg Kobolt igal nädalalõpul bed & breakfast'i härrastemaja stiilis. Gisselfeldi stiilis jõulukaunistustest, mis koosnevad kaunitest õitest ja vanikutest.18 ill

  3. 76 FR 40355 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Science.gov (United States)

    2011-07-08

    .... FOR FURTHER INFORMATION CONTACT: Greg Schaner, Water Permits Division, Office of Wastewater Management... under the impression that the June 30, 2011 date provided sufficient time to finalize a new permit... construction projects, with streamlined authorization procedures and best management practice (BMP...

  4. 76 FR 19177 - Agency Information Collection Activities: Notice of Request for Extension of Currently Approved...

    Science.gov (United States)

    2011-04-06

    ..., except Federal holidays. FOR FURTHER INFORMATION CONTACT: Greg Wolf, 202-366-4655, Department of...., Washington, DC 20590, Monday through Friday, except Federal holidays. SUPPLEMENTARY INFORMATION: Title..., American Samoa, Northern Mariana Islands, and the Virgin Islands. Estimated Average Annual Burden: The...

  5. PARASITIC AND SYMBIOTIC FAUNA IN OYSTERS (CRASSOSTREA VIRGINICA) AND MUD CRABS (PANOPEUS SPP.) FROM THE CALOOSAHATCHEE ESTUARY, FLORIDA, USA.

    Science.gov (United States)

    Volety, Aswani K., S. Greg Tolley and James T. Winstead. 2002. Parasitic and Symbiotic Fauna in Oysters (Crassostrea virginica) and Mud Crabs (Panopeus spp.) from the Caloosahatchee Estuary, Florida, USA (Abstract). Presented at the 4th International Conference on Molluscan Shell...

  6. Lone-Wolf Terrorist Radicalization and the Prisoner’s Dilemma: Ensuring Mutual Cooperation Between at-Risk Muslim Americans and Local Communities

    Science.gov (United States)

    2015-09-01

    successful method of attack on American soil .2 In investigating the radicalization process, one approach that has not been applied is the “prisoner’s...Conflict and Terrorism (Forthcoming, November 2015), 5-6; Bruce Hoffman, Inside Terrorism, revised and expanded edition (New York: Colombia ...10, 2013. https://www.youtube.com/watch?v=px-lhuA1ZgA. Hoffman, Bruce. Inside Terrorism. Revised and expanded edition. New York: Colombia University

  7. SSC San Diego Command History Calendar Year 2007

    Science.gov (United States)

    2008-03-01

    Camargo , Sylvia Salazar, Karen Manley-Guerrero, Dina Demuth, Clay Oeholke, Gannon Graue, Dee Johnson, Erwin Mier, Hoa Nguyen. Navy Multiband Terminal...Davenport, Brian Devine, Greg Doriguzzi, Richard Felkins, John Fleming, Cheryl Francisco , Sid Graser, Eric Hillis, Craig LaMaster, Susan Manor, Joel

  8. Real-Time High-Dynamic Range Texture Mapping

    Science.gov (United States)

    2001-01-01

    the renderings produced by radiosity and global illumination algorithms. As a particular example, Greg Ward’s RADIANCE synthetic imaging system [32...in soft- ware only. [26] presented a technique for performing Ward’s tone reproduction algo- rithm interactively to visualize radiosity solutions

  9. Big Machines and Big Science: 80 Years of Accelerators at Stanford

    Energy Technology Data Exchange (ETDEWEB)

    Loew, Gregory

    2008-12-16

    Longtime SLAC physicist Greg Loew will present a trip through SLAC's origins, highlighting its scientific achievements, and provide a glimpse of the lab's future in 'Big Machines and Big Science: 80 Years of Accelerators at Stanford.'

  10. 75 FR 36091 - Notice of Availability of the Draft Environmental Impact Statement for Improvements to the...

    Science.gov (United States)

    2010-06-24

    ... Environmental Quality Advisor, Portfolio Management Division, Capital Investment Branch (9P2PTC), U.S. General...://www.gsa.gov/nepalibrary . Other matters regarding this environmental review should be referred to Greg... GENERAL SERVICES ADMINISTRATION Notice of Availability of the Draft Environmental Impact Statement...

  11. "Tallinna moodul" pakub linnale ühtset vormi / Margit Tõnson

    Index Scriptorium Estoniae

    Tõnson, Margit, 1978-

    2004-01-01

    Rahvusvahelise ideekonkursi võitis "Fold", autorid Clayton Welham ja Martin Yong Londonist. II koht tööle "Drunken Style", autorid Samson Adjei, Harry Dobbs Ja Greg Epps Londonist. III koht itaalia disaineritele, ergutuspreemiad Argentiinasse ja New Yorki. Kommenteerinud linnadisainer Aavo Ermel

  12. Program Manager: Journal of the Defense Systems Management College. Volume 23, Number 1, January-February 1994

    Science.gov (United States)

    1994-02-01

    Jones, Jr. PROGRAM MANAGER Managing Editor Esther M. Farria Art Director Greg Caruth Typography and Design Paula Croisetlere Program Manager (ISSN 0199...Company bombers to implement the strategic organization - President Clayton 1. Brukner commu- bombing doctrine. This would take all brand -new cre

  13. Tight fitting garter springs-MODAR

    Energy Technology Data Exchange (ETDEWEB)

    Kazimer, D. [Bruce Power, Tiverton, Ontario (Canada)

    2011-07-01

    Annulus spacers are used in CANDU reactors to maintain the annular gap between two tubes - an inner pressure tube (PT) and the outer calandria tube (CT). Typically four annulus spacers are used in one fuel channel assembly, each at a specified axial position. Bruce Unit 8 and many other CANDU units were constructed with tight-fitting garter springs (TFGS). The TFGS were not designed to be detected or relocated by the conventional tool, Spacer Location And Repositioning (SLAR) processes. Due to non-optimal 'As Left' construction locations for the Bruce Unit 8 TFGS, PT/CT contact has been predicted to occur well prior to its End of Life (EOL). Bruce Power entered a Project with AECL-CRL to design, manufacture and test and implement a new tooling system that would detect and reposition tight fitting annulus spacers. (author)

  14. Safe Ride Standards for Casualty Evacuation Using Unmanned Aerial Vehicles (Normes de transport sans danger pour l’evacuation des blesses par vehicules aeriens sans pilote)

    Science.gov (United States)

    2012-12-01

    September 2008. 11.2 CLINICAL AND OPERATIONAL DOCUMENTS Aerospace Medical Association Air Transport Committee, “Medical Guidelines for Airline ...RTO-MP-HFM-157////MP-HFM-157-19.doc. Turner, S., Ruth, M.J. and Bruce, D.L., “In Flight Catering : Feeding Critical Care Patients During Aeromedical...feet. 8 Turner, S., Ruth, M.J. and Bruce, D.L. “In flight catering : Feeding critical care patients during aeromedical evacuation”. 9 Renz, E.M

  15. 77 FR 19164 - Atlantic Highly Migratory Species; 2006 Consolidated Highly Migratory Species Fishery Management...

    Science.gov (United States)

    2012-03-30

    ... RIN 0648-XB121 Atlantic Highly Migratory Species; 2006 Consolidated Highly Migratory Species Fishery..., United States Virgin Islands (USVI) St. Thomas, USVI, San Juan, Puerto Rico (PR), Ponce, PR, and Mayaguez... INFORMATION CONTACT: Greg Fairclough or Randy Blankinship at 727-824-5399. SUPPLEMENTARY INFORMATION: Atlantic...

  16. African Journal of AIDS Research - Vol 5, No 2 (2006)

    African Journals Online (AJOL)

    Talking about sex in Botswana: social desirability bias and possible implications for HIV-prevention research · EMAIL FULL TEXT EMAIL FULL TEXT DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. Kata Chillag, Greg Guest, Arwen Bunce, Laura Johnson, Peter H Kilmarx, Dawn K Smith, 123-131.

  17. Employment Relations in Denmark

    DEFF Research Database (Denmark)

    Madsen, Jørgen Steen; Due, Jesper Jørgen; Andersen, Søren Kaj

    2011-01-01

    Jørgen Steen Madsen, Jesper Due og Søren Kaj Andersen har skrevet et kapitel om udviklingen i dansk arbejdsmarkedsregulering til bogen International and Comparative Employment Relations, redigeret af Greg Bamber, Russell Lansbury og Nick Wailes. Bogen indeholder bidrag, der præsenterer og...

  18. Water-Quality Monitoring and Studies of the Formation and Fate of Trihalomethanes During the Third Injection, Storage, and Recovery Test at Lancaster, Antelope Valley, California, March 1998 Through April 1999

    Science.gov (United States)

    2002-01-01

    during preparation of this report, and reviews by Darnella Murphy, Greg Mendez , Rick Iwatsubo, and Peter Martin contributed immensely to this work...Mary Gibson and Carol Sanchez edited the report, and Cathy Munday constructed figure 1. WATER-QUALITY MONITORING AT WELLS Water samples were

  19. A Type System For Certified Runtime Type Analysis

    Science.gov (United States)

    2002-12-01

    1999 ACM SIGPLAN International Conf. on Functional Pro- gramming (ICFP’99), pages 183–196. ACM Press, September 1999. [Min97] Yasuhiko Minamide. Full...lifting of type parameters. Technical report, RIMS, Kyoto University, 1997. [MMH96] Yasuhiko Minamide, Greg Morrisett, and Robert Harper. Typed

  20. Prehospital Use of Plasma for Traumatic Hemorrhage - PUPTH-IIA

    Science.gov (United States)

    2016-08-01

    Distribution Unlimited 1 Jun 2012 - 31 May 2016 W81XWH-12-2-0022 13. SUPPLEMENTARY NOTES Dr. Bruce Spiess , MD, Penny S. Reynolds, PhD, (Study PIs) and...decision for termination of the PUPTH trial before the end of the award period was made by Dr. Bruce Spiess (Principal Investigator) and the PUPTH...results and recommendations for future trial management have been submitted for publication in Trials and are currently under review.  Dr Spiess and

  1. Bruce X Longwood television reception survey

    International Nuclear Information System (INIS)

    Hatanaka, G.K.

    1992-01-01

    Property owners living close to a proposed 500-kV transmission line route in Ontario expressed concerns that the line would affect their television reception. To give a reasonable evaluation of the impact of the transmission line, tests were conducted before and after installation of the line in which the possibility of active or passive interference to reception was assessed. Measurements were made of signal strength and ambient noise, and television reception was also recorded on videotape. Possible transmission line effects due to radiated noise, signal reduction, and ghosts are analyzed. The analysis of signal and noise conditions, and the assessment of videotaped reception, provide reasonable evidence that the line has had negligible impact on the television reception along the line route. 13 refs., 18 figs., 12 tabs

  2. Kasulikku lugemist

    Index Scriptorium Estoniae

    2009-01-01

    Tutvustus: The information literacy cookbook : ingredients, recipes and tips for success. Oxford : Chandos Publishing, 2007. Notess, Greg R. Teaching Web search skills : techniques and strategies of top trainers. Medford, N. J. : Information Today, Inc., 2006. Poyner, Ann. Enabling end-users : information skills training. Oxford : Chandos, 2005.

  3. Critical Arts - Vol 15, No 1 (2001)

    African Journals Online (AJOL)

    The Internet in Africa - A New Road to Developmental Opportunities or a Digital Highway leading to Nowhere? Arnold S de Beer. Caught between Empires: Ambivalence in Australian Films. Greg McCarthy. REVIEW: African Years: The Zimbabwe Land Invasions, by Catherine Buckle. Bhekimpilo Sibanda. REVIEW: The ...

  4. Establishment of five cover crops and total soil nutrient extraction in a humid tropical soil in the Peruvian Amazon

    Science.gov (United States)

    In order to evaluate the establishment of five cover crops and their potential to increase soil fertility through nutrient extraction, an experiment was installed in the Research Station of Choclino, San Martin, Peru. Five cover crops were planted: Arachis pintoi Krapov. & W.C. Greg, Calopogonium m...

  5. Return from space: from the International Space Station to CERN

    CERN Multimedia

    2012-01-01

    On 16 May 2011, the space shuttle Endeavour took off for the last time from Cape Canaveral in Florida with six astronauts on board. Their mission (code-named STS-134) was to install the Alpha Magnetic Spectrometer (AMS), the dark matter and antimatter detector designed at CERN, on the International Space Station. Since then, AMS has been sending data to CERN from space.   On Wednesday 25 July do not miss a rare opportunity to meet the mission’s six astronauts at CERN: Mark E. Kelly, commander (NASA) Greg H. Johnson, pilot (NASA) and the mission’s specialists: Michael Fincke (NASA) Roberto Vittori (ESA and ASI) Andrew J. Feustel (NASA) Greg Chamitoff (NASA) 4:20 pm: the event will kick off with a photo and autograph session at the Globe of Science and Innovation. 5 pm: lecture given by the astronauts for CERN personnel and summer students in the Main Auditorium. (Seats reserved for the summer students - contact: summer.student.info@cern.ch). ...

  6. A Literature Review of Cultural Resources in Morgan County, Colorado,

    Science.gov (United States)

    1978-06-02

    MILES APPRCXI: %TE LOCATIONS OF SURVEY AREAS 1. NARROWS DAM SURVEY 2. WILDCAT CREEK SURVEY 3. BRUS { FLOOD CO’IOL PROJECT L B3I B LI 0 RAP H Y...Kenneth L. 1975 Edible plants available to aboriginal occupants of the Narrows area. IN Morris, Elizabeth Ann, Bruce J. Lutz, N. Ted Ohr, Timothy J...Reservoi - , Morgan County. Prepared for -1e Riverside IrrigaLion District and Public Service Company of Colorado. Morris, Elizabeth Ann, Bruce J. Lutz, N

  7. The Navy Supply Corps Newsletter. Contracting Innovations: Navy Electronic Commerce Online Navy Afloat Purchase Card Program. Volume 62, No. 3.

    Science.gov (United States)

    1998-06-01

    Mike Lyden John Lantelme Andy Mackel Jesus Malgapo Carol Marcinek Greg Martin Michelle McAtee Molly McClellan Jerry McEnerney Laurie McKee...Paul McNeill Walt Melton Rich Mendez Mike Metts Jon Miller Ron Mosley Jim Naber Craig Nostrant NAVSUP USSNORMANDY(CG60) DDRE NORFOLK NPGS

  8. 78 FR 46565 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Science.gov (United States)

    2013-08-01

    ... INFORMATION: The following business will be conducted: 1. Continue formulation of advice to the Secretary for... this meeting is to continue the formulation of advice to the Secretary on the Proposed Land Management... case-by-case basis. Dated: July 25, 2013. Greg Smith, Acting Associate Deputy Chief, National Forest...

  9. Program Manager: Journal of the Defense Systems Management College. Volume 22, Number 3, May-June 1993

    Science.gov (United States)

    1993-06-01

    lr __________ r onM eth S()4 Greg Caruth _________________ William J. Perry, Typography and Design DEPSECDEF 43 Paula Croisetlere 3 Program Manager...the DSMC Press to be such a link to the govern- for publication consideration in either the brand ment and private sector defense acquisition com- new

  10. Prediction of pressure tube fretting-wear damage due to fuel vibration

    International Nuclear Information System (INIS)

    Yetisir, M.; Fisher, N.J.

    1997-01-01

    Fretting marks between fuel bundle bearing pads and pressure tubes have been observed at the inlet end of some Darlington Nuclear Generating Station (NGS) and Bruce NGS fuel channels. The excitation mechanisms that lead to fretting are not fully understood. In this paper, the possibility of bearing pad-to-pressure tube fretting due to turbulence-induced motion of the fuel element is investigated. Numerical simulations indicate that this mechanism by itself is not likely to cause the level of fretting experienced in Darlington and Bruce NGSs. (orig.)

  11. Travelling among fellow Christians (1768-1833)

    DEFF Research Database (Denmark)

    Friis, Ib

    2013-01-01

    different: Bruce was an eccentric and wealthy Scottish laird with attitudes characteristic of his class. Salt, an English artist and secretary to a British peer of the realm, had more liberal attitudes. Rüppell, a German naturalist sent by the Senckenberg Naturforschende Gesellschaft, a learned association...... in Frankfurt, approached the Abyssinians with scholarly attitudes of his time. Bruce, Salt and Rüppell expressed views about the past and present of the Christian Abyssinian civilisation; Salt also nourished a political vision for future interaction between Abyssinia and Britain....

  12. Teaching Secondary Social Studies

    Directory of Open Access Journals (Sweden)

    Colin Everett

    2018-03-01

    Full Text Available Review of the book, instructional strategies for middle and high school social studies: Methods, assessment, and classroom management, by Bruce E. Larson. The book has two goals: It situates the learning of social studies within the broader developmental context of learning and also focuses on “Instructional Strategies.” “Instructional Strategies for Middle and High School Social Studies: Methods, Assessment, and Classroom Management.” 2nd Edition. By Bruce E. Larson. New York: Routledge, 2017. ISBN: 978-1-138-84678-4

  13. Gentlemen We Are Out of Money...Now We Have to Think - Prioritization of Objectives in a Resource Constrained Environment

    Science.gov (United States)

    2012-02-15

    Additionally I would like to thank Dr. Greg Parnell, Ph.D., MAJ Melanie Vinton, COL William Sorrells, COL Simon Goerger, Ph.D., COL Chris Hill, Ph.D., and... Klein , J. Orasanu, R. Calderwood, & C. E. Zsambok (Eds.), Decision Making in Action: Models and Methods (pp. 327-345). Norwood, NJ: Ablex Publishers

  14. Evolution of CANDU reactor design

    International Nuclear Information System (INIS)

    Pon, G.A.

    1978-08-01

    The CANDU (CANada Deuterium Uranium) design had its begin-ings in the early 1950's with the preliminary engineering studies that led to the 20 MW(e) NPD (Nuclear Power Demonstration) and the 200 MW(e) Douglas Point station . The next decade saw the first operation of both these stations and the commitment of the 2000 MW(e) Pickering and 3000 MW(e) Bruce plants. The present decade has witnessed the excellent performance of Pickering and Bruce and commitments to construct Gentilly-2, Cordoba, Pt. Lepreau, Wolsung, Pickering B, Bruce B and Darlington. In most cases, successive CANDU designs have meant an increase in plant output. Evolutionary developments have been made to fit the requirements of higher ratings and sizes, new regulations, better reliability and maintainability and lower costs. These changes, which are described system by system, have been introduced in the course of engineering parallel reactor projects with overlapping construction schedules -circumstances which ensure close contact with the practical realities of economics, manufacturing functions, construction activities and performance in commissioning. Features for one project furnished alternative concepts for others still on the drawing board and the experience gained in the first application yielded a sound basis for its re-use in succeeding projects. Thus the experiences gained in NPD, Douglas Point, Gentilly-1 and KANUPP have contributed to Pickering and Bruce, which in turn have contributed to the design of Gentilly-2. (author)

  15. Evaluation of boiler chemical cleaning techniques

    International Nuclear Information System (INIS)

    1993-04-01

    The EPRI/SGOG process, which has been selected by Ontario Hydro for use at the Bruce A station, is described. This process consists of alternating iron removal and copper removal steps, the two metals which comprise the bulk of the deposit in the Bruce A SGs. The iron removal solvent consists of ethylenediameinetetraacetic acid (EDTA), hydrazine, ammonium hydroxide and a proprietary corrosion inhibitor CCI-801. The copper removal solvent consists of EDTA, ethylene diamine and hydrogen peroxide. Ontario Hydro proposes to clean a bank of four SGs in parallel employing a total of six copper removal steps and four iron removal steps. Cleaning all eight SGs in a single Bruce A unit will generate 2,200 m 3 of liquid waste which will be treated by a wet air oxidation process. The iron and copper sludges will be buried in a landfill site while the liquid waste will be further treated by the Bruce sewage treatment plant. Some ammonia vapour will be generated through the wet air oxidation process and will be vented through a stack on top of the high bay of the spent solvent treatment plant. With the exception of the proprietary corrosion inhibitor, all chemicals that will be employed in the cleaning and waste treatment operations are standard industrial chemicals which are well characterized. No extraordinary hazards are anticipated with their use as long as adequate safety precautions are taken

  16. Caught between Empires: Ambivalence in Australian Films ...

    African Journals Online (AJOL)

    Caught between Empires: Ambivalence in Australian Films. Greg McCarthy. AJOL African Journals Online. HOW TO USE AJOL... for Researchers · for Librarians · for Authors · FAQ's · More about AJOL · AJOL's Partners · Terms and Conditions of Use · Contact AJOL · News. OTHER RESOURCES... for Researchers · for ...

  17. Electrical Activation Studies of Silicon Implanted Aluminum Gallium Nitride with High Aluminum Mole Fraction

    Science.gov (United States)

    2007-12-01

    like to thank the many friends I have made along the way, Matt Lange, Catherine Taylor, Glen Kading, and Greg Pitz for helping me to remember that life...oxidation. The Ta wrapping wire survives the anneal intact, but becomes brittle enough to easily break off. The samples are taken to the clean room

  18. Fuel deposits, chemistry and CANDU® reactor operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    2014-01-01

    'Hot conditioning' is a process which occurs as part of commissioning and initial start-up of each CANDU® reactor, the first being the Nuclear Power Demonstration - 2 reactor (NPD). Later, understanding of the cause of the failure of the Pickering Unit 1 G16 fuel channelled to a revised approach to 'hot conditioning', initially demonstrated on Bruce Unit 5. The difference being that during 'hot conditioning' of CANDU® heat transport systems fuel was not in-core until Bruce Unit 5. The 'hot conditioning' processes will be briefly described along with the consequences to fuel. (author)

  19. Test pilots 1962 - Armstrong, Walker, Dana, Peterson, McKay, Thompson, Butchart

    Science.gov (United States)

    1962-01-01

    The research pilots at what in 1962 was called the Flight Research Center standing in front of the X-1E. They are (left to right) Neil Armstrong, Joe Walker, Bill Dana, Bruce Peterson, Jack McKay, Milt Thompson, and Stan Butchart. of the group, Armstrong, Walker, Dana, McKay and Thompson all flew the X-15. Bruce Peterson flew the M2-F2 and HL-10 lifting bodies, while Stan Butchart was the B-29 drop plane pilot for many of the D-558-II and X-1 series research aircraft.

  20. Not so indifferent after all? Self-conscious atheism and the secularisation thesis

    Directory of Open Access Journals (Sweden)

    Stephen Bullivant

    2012-06-01

    Full Text Available Commenting on the lack of self-conscious atheists in apparently secularised Western European societies, the British sociologist Steve Bruce has argued that strong expressions of unbelief are in fact symptomatic of religious cultures. In 1996’s Religion in the Modern World, for instance, he writes: ‘it should be no surprise that, though there are more avowed atheists than there were twenty years ago, they remain rare. Self-conscious atheism and agnosticism are features of religious cultures and [in Britain] were at their height in the Victorian era. They are postures adopted in a world where people are keenly interested in religion.’ (Bruce 1996: 58. Likewise, discussing possible ‘endpoints’ of European secularisation in 2002’s God is Dead, Bruce states: In so far as I can imagine an endpoint, it would not be conscious irreligion; you have to care too much about religion to be irreligious. It would be widespread indifference (what Weber called being religiously unmusical; no socially significant shared religion; and religious ideas being no more common than would be the case if all minds were wiped blank and people began from scratch to think about the world and their place in it. (Bruce 2002: 42, my emphasis.Paradoxical though it may sound at first, Bruce’s basic­ argument makes considerable sense. The idea that certain forms of particularly positive atheism – by which I mean a definite belief in the non-existence of a God or gods, as opposed to the simple absence of a belief in the same (negative atheism – might be motivated, conditioned, or reinforced, by contrast with certain, socially prevalent religious beliefs or practices is scarcely controversial. After all, it would be strange to take one’s atheism seriously in a society where no one took theism seriously. A society that is indifferent to manifestations of religion (such as Bruce and others depict many late-modern western societies as being ought, therefore, to be

  1. Author Details

    African Journals Online (AJOL)

    McCarthy, Greg. Vol 15, No 1 (2001): Media Freedom and Human Rights - Articles Caught between Empires: Ambivalence in Australian Films Details. ISSN: 0256-004. AJOL African Journals Online. HOW TO USE AJOL... for Researchers · for Librarians · for Authors · FAQ's · More about AJOL · AJOL's Partners · Terms and ...

  2. Veneetsia arhitektuuribiennaal

    Index Scriptorium Estoniae

    2008-01-01

    Veneetsia XI arhitektuuribiennaalist. Biennaali üldkuraator Aaron Betsky. Giardini parki rajatud eestlaste installatsioonist "Gaasitoru" (autorid: Maarja Kask, Ralf Lõoke ja Neeme Külm, kuraator Ingrid Ruudi), rahvusekspositsioonide peapreemia saanud Poola paviljonist "Hotel Polonia", Austraalia, Tšehhi ja Slovakkia ekspositsioonidest, objektipreemia pälvinud Greg Lynn'i vanadest mänguasjadest valmistatud mööblist

  3. What determines the exchange rate: economic factors or market sentiment?

    OpenAIRE

    Gregory P. Hopper

    1997-01-01

    Do economic factors influence exchange rates? Or does market sentiment play a bigger role? Are short-run exchange rates predictable? Greg Hopper reviews exchange-rate economics, focusing on what is predictable and what isn't. He also examines the practical implications of exchange-rate theories for currency option pricing, risk management, and portfolio selection.

  4. A MÍSTICA RENANA E O PENSAMENTO DE VLADIMIR LOSSKY

    Directory of Open Access Journals (Sweden)

    Edrisi Fernandes

    2015-07-01

    Full Text Available Nossa reflexão consiste na reavaliação de algumas considerações originais de Vladimir Lossky em Théologie négative et connaissance de Dieu chez Maître Eckhart (publicação póstuma, Paris, 1960 quanto a uma aproximação entre a teologia apofática e a relação entre Essência e Energias divinas em escritos do Mestre Eckhart (1260-1328 e de Gregório Palamas (1296-1359, rememorando o projeto losskiano (inacabado de efetuar um estudo das convergências ou semelhanças entre a mística renana e o “palamismo”. Para isso, levamos em conta opiniões defendidas por Nikolai Gavryushin em "‘Istínnoe bogoslovie preobrazhaet metafiziku’: Zametki o Vladimire Losskom" ("‘A verdadeira teologia transforma a metafísica’: Notas sobre Vladimir Lossky", 2004, e analisamos o inacabado projeto de Lossky à luz da revisão das ideias de Gregório Palamas operada por pensadores da “escola russa de neoplatonismo”.

  5. Fundamentals of asset management in an ageing nuclear power station

    International Nuclear Information System (INIS)

    Crook, B.

    2014-01-01

    In an ageing nuclear power station there are many challenges associated with implementing and refining an asset management program. Ageing nuclear power stations are faced with the formidable task of replacing and refurbishing major Structures, Systems, and Components (SSCs) in a managed and cost-effective way. This paper provides a brief background on equipment reliability and asset management, covers Bruce Power's methodology for implementing this complex and all-encompassing program, and describes one of the key challenges faced by Bruce Power and the industry. The effective scoping and identification of critical components is an on-going challenge which can affect the integrity of many processes built upon it. This is a fundamental building block to nearly all processes at Bruce Power and one that is at the centre of many improvement initiatives and projects. The consequences from lacking this baseline data, or worse relying upon incorrect data, can permeate the asset management process and hinder the organization's ability to assess risk properly and take the necessary steps to mitigate this risk in the short and long term. (author)

  6. Annual report/1979

    International Nuclear Information System (INIS)

    1980-04-01

    Primary energy demand in Ontario in 1979 was up by 2.9 percent, compared to 2.7 percent in the previous year. Revised forecasts issued in January 1980 indicate Ontario's need for electricity is expected to grow by an average of 3.4 percent annually to the year 2000. Nuclear generation provided 29 percent of the total energy made available by Hydro, and Hydro's eight reactors at Pickering and Bruce continued to rank in the top 36 - four in the top 10 - when compared to the permance of 104 of the world's largest reactors. The provinical legislature's Select Committee on Hydro Affairs examined the safety of the CANDU system and concluded that is is 'acceptably safe'. Faced with reduced forecasts of electrical demands to the year 2000 the Board of Directors decided to stretch out the construction schedule of the Darlington station, to halt construction of the second half of the Bruce Heavy Water Plant D, and to complete but mothball the first half. Construction of Bruce Heavy Water Plant B was completed early in 1979. The A plant produced 599.8 megagrams of reactor-grade heavy water. A control room simulator for Bruce A nuclear generating station was ordered. Agreement was reached on rebuilding faulty boilers at Pickering B. A total of 757.6 megagrams of uranium was used to produce electrical energy and steam. Ontario Hydro continued involvement in uranium exploration. Studies on radioactive waste disposal are being carried out, with emphasis on interim storage and transportation. (LL)

  7. Recent fuel handling experience in Canada

    International Nuclear Information System (INIS)

    Welch, A.C.

    1991-01-01

    For many years, good operation of the fuel handling system at Ontario Hydro's nuclear stations has been taken for granted with the unavailability of the station arising from fuel handling system-related problems usually contributing less than one percent of the total unavailability of the stations. While the situation at the newer Hydro stations continues generally to be good (with the specific exception of some units at Pickering B) some specific and some general problems have caused significant loss of availability at the older plants (Pickering A and Bruce A). Generally the experience at the 600 MWe units in Canada has also continued to be good with Point Lepreau leading the world in availability. As a result of working to correct identified deficiencies, there were some changes for the better as some items of equipment that were a chronic source of trouble were replaced with improved components. In addition, the fuel handling system has been used three times as a delivery system for large-scale non destructive examination of the pressure tubes, twice at Bruce and once at Pickering and performing these inspections this way has saved many days of reactor downtime. Under COG there are several programs to develop improved versions of some of the main assemblies of the fuelling machine head. This paper will generally cover the events relating to Pickering in more detail but will describe the problems with the Bruce Fuelling Machine Bridges since the 600 MW 1P stations have a bridge drive arrangement that is somewhat similar to Bruce

  8. Let Them Eat Kale: Schools Get Serious about Nutrition

    Science.gov (United States)

    Whelan, Debra Lau

    2008-01-01

    The kids at Louisa May Alcott School were more into Flamin' Hot Cheetos and nachos than frisee and couscous. That is, until Greg Christian got to them. Exactly three years ago, the chef known as Chicago's conscious caterer decided to share his gastronomic talents with the city's low-income children. So he took his pilot program straight to the…

  9. Science as Content, Science as Context: Working in the Science Department

    Science.gov (United States)

    Wildy, Helen; Wallace, John

    2004-01-01

    In this study we explored how the science department shaped the relationship between a science department head, Mr Greg, and a teacher, Ms Horton, as they grappled with their expectations of, and responsibilities for, teaching and leadership in the daily life in the department. We found that, from their life histories and their positions in the…

  10. Arhitektuurivõistlus 21. sajandi kodu Lahemaal

    Index Scriptorium Estoniae

    2012-01-01

    Hinnang peapreemia pälvinud töödele "Ranna-Niidu" (Mikk Mutso), "Sirmik" (Maarja Elm, Sten Ader), "Akupunktuur" (Lidia Zarudnaja, Martin Noorväli, Urmas Paul) ja "Adaptsioon" (Kristjan Tõlk, Olavi Kukk, Heleriin Vaher) ning eripreemia pälvinud töödele "Greg" (Eve Komp, Artur Staškevitš) ja "Potjomkin" (Johan Tali)

  11. Smooth Jazz天团——Acoustic Alchemy原声炼金术 即将来华

    Institute of Scientific and Technical Information of China (English)

    吉他中国

    2012-01-01

    Smooth Jazz天团——Acoustic Alchemy原声炼金术载誉三十年首度首度来华!格莱美金曲提名"Reference Point"格莱美提名最佳流行乐器演奏专辑《AArt》原声吉他大师Greg Carmichael挂帅

  12. Leadershock ... and How to Triumph over It

    Science.gov (United States)

    Benzel, Brian L.

    2004-01-01

    The fundamental elements of leadership are not always evident in new challenges. Greg Hicks uses LeaderShock ... And How to Triumph Over It to remind leaders that the basics matter. Hicks, a business professor at San Jose State University and a trainer for Fortune 500 companies around the world, uses common sense, experience and excellent examples…

  13. Prediction of pressure tube fretting-wear damage due to fuel vibration

    Energy Technology Data Exchange (ETDEWEB)

    Yetisir, M; Fisher, N J [Atomic Energy of Canada Ltd., Chalk River, ON (Canada)

    1996-12-31

    Fretting marks between fuel bundle bearing pads and pressure tubes have been observed at the inlet end of some Darlington NGS (nuclear generating station) and Bruce NGS fuel channels. The excitation mechanisms that lead to fretting are not fully understood. In this paper, the possibility of bearing pad-to-pressure tube fretting due to turbulence-induced motion of the fuel element is investigated. Numerical simulations indicate that this mechanism by itself is not likely to cause the level of fretting experienced in Darlington and Bruce NGS`s (nuclear generating stations). (author). 12 refs., 2 tabs., 11 figs.

  14. Integrated management system laying a foundation for excellence

    Energy Technology Data Exchange (ETDEWEB)

    Brissette, S.; Vincent, D. [Bruce Power, Tiverton, Ontario (Canada)], E-mail: Derek.VINCENT@brucepower.com

    2009-07-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  15. Integrated management system laying a foundation for excellence

    International Nuclear Information System (INIS)

    Brissette, S.; Vincent, D.

    2009-01-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  16. Russia steps up Baltic incursions / Bruce Jones

    Index Scriptorium Estoniae

    Jones, Bruce

    2017-01-01

    Peale Leedu presidendi 31. juuli avaldust, et Leetu Šiauliai õhuväebaasi tuuakse NATO hävituslennukeid juurde, on Balti õhuruumis märgatud järjest rohkem registreerimata ja sisselülitamata transponderitega Venemaa lennukeid. Selle üheks põhjuseks peetakse lähenevat Venemaa sõjalist suurõppust Zapad 2017

  17. Thermal Treatment Technologies: Lessons Learned

    Science.gov (United States)

    2011-11-01

    With contributions from: Gorm Heron, Ralph Baker, and Gregory Crisp (TerraTherm) Greg Smith (Thermal Remediation Services, Inc.) Phil La Mori...vapor is generated by boiling, and leaves the volume, carrying contaminant vapors H O H O2 2( )1 1c cw w w g w g d M C dM C dt dt   rate of change

  18. Middle Grade Tell-Alls: Wimpy Kid Read-Alikes

    Science.gov (United States)

    Giffard, Sue

    2011-01-01

    On the "New York Times" Children's Best Sellers list for more than two years, Jeff Kinney's "Diary of a Wimpy Kid" still causes groups of children to enthusiastically exclaim that it's the "best book ever." What is it that kids love about Greg Heffley and his escapades? Why are they overcome with laughter while simply trying to explain his humor?…

  19. Technology in the Montessori Classroom: Benefits, Hazards and Preparation for Life

    Science.gov (United States)

    MacDonald, Greg

    2016-01-01

    Greg MacDonald cites much research on the pros and cons of technology for children of all ages and gives the reader the information and space to sort out what their own policy will be. He supports the use of computers in elementary classrooms if there is a practical purpose, a group project, or no alternative approach available, such as for…

  20. Topology Control in Aerial Multi-Beam Directional Networks

    Science.gov (United States)

    2017-04-24

    Topology Control in Aerial Multi-Beam Directional Networks Brian Proulx, Nathaniel M. Jones, Jennifer Madiedo, Greg Kuperman {brian.proulx, njones...significant interference. Topology control (i.e., selecting a subset of neighbors to communicate with) is vital to reduce the interference. Good topology ...underlying challenges to topology control in multi-beam direction networks. Two topology control algorithms are developed: a centralized algorithm

  1. Smart and intelligent sensor payload project

    Science.gov (United States)

    2009-01-01

    Engineers working on the smart and intelligent sensor payload project include (l to r): Ed Conley (NASA), Mark Mitchell (Jacobs Technology), Luke Richards (NASA), Robert Drackett (Jacobs Technology), Mark Turowski (Jacobs Technology) , Richard Franzl (seated, Jacobs Technology), Greg McVay (Jacobs Technology), Brianne Guillot (Jacobs Technology), Jon Morris (Jacobs Technology), Stephen Rawls (NASA), John Schmalzel (NASA) and Andrew Bracey (NASA).

  2. Computers are stepping stones to improved imaging.

    Science.gov (United States)

    Freiherr, G

    1991-02-01

    Never before has the radiology industry embraced the computer with such enthusiasm. Graphics supercomputers as well as UNIX- and RISC-based computing platforms are turning up in every digital imaging modality and especially in systems designed to enhance and transmit images, says author Greg Freiherr on assignment for Computers in Healthcare at the Radiological Society of North America conference in Chicago.

  3. Religious Roots: A Prolegomenon to Moral Judgment in American Policy

    Science.gov (United States)

    2012-03-15

    Bethany House Publishers, 1998), 71. For a very good commentary on this subject, read the chapters entitled, “The Absolutism of Moral Relativism ...Religious Roots: A Prolegomenon to Moral Judgment in American Policy by Lieutenant Colonel Greg Johnson Oregon Air...COVERED (From - To) 4. TITLE AND SUBTITLE Religious Roots: A Prolegomenon to Moral Judgment in American Policy Policy 5a. CONTRACT

  4. Nuclear process steam for industry

    International Nuclear Information System (INIS)

    Seddon, W.A.

    1981-11-01

    A joint industrial survey funded by the Bruce County Council, the Ontario Energy Corporation and Atomic Energy of Canada Limited was carried out with the cooperation of Ontario Hydro and the Ontario Ministry of Industry and Tourism. Its objective was to identify and assess the future needs and interest of energy-intensive industries in an Industrial Energy Park adjacent to the Bruce Nuclear Power Development. The Energy Park would capitalize on the infrastructure of the existing CANDU reactors and Ontario Hydro's proven and unique capability to produce steam, as well as electricity, at a cost currently about half that from a comparable coal-fired station. Four industries with an integrated steam demand of some 1 x 10 6 lb/h were found to be prepared to consider seriously the use of nuclear steam. Their combined plants would involve a capital investment of over $200 million and provide jobs for 350-400 people. The high costs of transportation and the lack of docking facilities were considered to be the major drawbacks of the Bruce location. An indication of steam prices would be required for an over-all economic assessment

  5. Prevalence and diagnostic test comparison of brucellosis in cattle in pabna and mymensingh districts of bangladesh

    International Nuclear Information System (INIS)

    Rahman, M.S.; Azad, M.K.; Ahasan, M.S.; Sarker, R.R.; Uddin, M.J.

    2013-01-01

    Present study was undertaken to determine the seroprevalence of brucellosis in cattle of Pabna and Mymensingh districts in Bangladesh. A total of 260 cattle sera samples were collected from Pahna and Mymensingh districts. The epidemiological data were collected by structured questionnaire. RBT and SAT were used as screening tests and further confirmed by 1-ELISA. The seroprevalence of Bruce/Ia ill cattle was estimated to be 4.23%, 3.07% and 2.31% by RBT, SAT and 1-ELISA, respectively. The comparison of the serological tests result revealed the highest prevalence in RBT than SAT and 1-EL ISA. The prevalence of Brucella was 2.5% in Pabna and 2.14% in Mymensingh. It was observed that, a higher prevalence of Bruce/la was found in female (2.67%) than in male (1.82%), natural breeding (2.67%) than artificial breeding (1.81%), in aged animals (3.33%) than young (1.25 degree percent). But these differences were not statistically significant. There exists significant difference between prevalence of Bruce/II in cattle with history of abortion than without history of abortion (P value=0.013). (author)

  6. Closing Remarks.

    Science.gov (United States)

    Reed

    1996-01-01

    About twenty years ago, the leaders of the National Cancer Institute (NCI) decided to start a new branch in the Clinical Oncology Program of the Division of Cancer Treatment. That new entity was named the Clinical Pharmacology Branch (CPB), and its first leader was a brilliant, young, promising investigator named Bruce A. Chabner. Chabner was educated at Yale and Harvard, and appeared to have an extraordinary grasp of novel concepts that were being developed in the emerging area of cancer chemotherapy. What the NCI leaders did not fully appreciate at the time was that they had just given birth to one of the most extraordinary careers in academic medicine. From the early seventies through the early eighties, Bruce Chabner developed a strong laboratory program that was based on scientific discovery and on the development of new talent. The CPB focused on new drug development, elucidation of drug mechanism(s) of action, and the development of new ways to use drugs that were already available. Concurrent with this laboratory effort was active participation in the development of clinical treatment regimens for Hodgkin's disease, non-Hodgkin's lymphoma, and other malignancies. Individuals who trained under Chabner are now cancer center directors, department heads, laboratory chiefs, and hold many other high-profile positions. From 1981 to 1995 Bruce Chabner was Director of the Division of Cancer Treatment (DCT) of the NCI. In that capacity he was Scientific Director of the Intramural Program within DCT, and he had oversight responsibility for the direction of extramural studies that were funded through the NCI, which were focused on the development of new treatments for human malignant disease. The NCI has five divisions for which the NCI Director has ultimate responsibility. While working with one NCI Director from 1981 to 1988, and with another from 1988 to 1995, and during the transition year of 1988, Bruce Chabner provided stability for the DCT while many changes

  7. Group Centric Networking: Large Scale Over the Air Testing of Group Centric Networking

    Science.gov (United States)

    2016-11-01

    Large Scale Over-the-Air Testing of Group Centric Networking Logan Mercer, Greg Kuperman, Andrew Hunter, Brian Proulx MIT Lincoln Laboratory...performance of Group Centric Networking (GCN), a networking protocol developed for robust and scalable communications in lossy networks where users are...devices, and the ad-hoc nature of the network . Group Centric Networking (GCN) is a proposed networking protocol that addresses challenges specific to

  8. Attack Helicopter Operations: Art or Science

    Science.gov (United States)

    1991-05-13

    ATTACK HELICOPTER OPERATIONS: ART OR SCIENCE ? BY LIEUTENANT COLONEL JAN CALLEN United States Army DISTRIBUTION STATEMENT A: Approved for public release...TASK IWORK UNIT ELEMENT NO. NO. NO. ACCESSION NC 11. TITLE (Include Socurity Classification) Attack Helicopter Operations: Art or Science ? 12. PERSONAL...OPERATIONS: ART OR SCIENCE ? AN INDIVIDUAL STUDY PROJECT by Lieutenant Colonel Jan Callen United States Army Colonel Greg Snelgrove Project Adviser U.S

  9. Low Cost, Low Power, High Sensitivity Magnetometer

    Science.gov (United States)

    2008-12-01

    which are used to measure the small magnetic signals from brain. Other types of vector magnetometers are fluxgate , coil based, and magnetoresistance...concentrator with the magnetometer currently used in Army multimodal sensor systems, the Brown fluxgate . One sees the MEMS fluxgate magnetometer is...Guedes, A.; et al., 2008: Hybrid - LOW COST, LOW POWER, HIGH SENSITIVITY MAGNETOMETER A.S. Edelstein*, James E. Burnette, Greg A. Fischer, M.G

  10. Thinking straight

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Two thousand five hundred linear accelerators are now estimated to be in use throughout the world. Of these a negligible number are on particle physics machines; yet they have all stemmed from the technology developed to do particle physics. This figure was quoted at the 1986 Linear Accelerator Conference which drew 300 linac specialists to Stanford in June for a meeting excellently organized under Greg Loew

  11. Tallinna Moodul = Tallinn Module / Siiri Vallner

    Index Scriptorium Estoniae

    Vallner, Siiri, 1972-

    2004-01-01

    Rahvusvahelisest disainivõistlusest Tallinna Moodul, mille eesmärk oli leida tänavamööbli süsteem, kus erinevad elemendid (kioskid, telefoniputkad, istepingid, bussiootepaviljonid, reklaamialused jne.) on seotud kontseptuaalselt ühtseks tervikuks. Osalejatest, võidutöödest. Preemiad: I - Clayton Welham, Martin Yong, London, II - Samson Adjei, Harry Dobbs, Greg Epps, London, III - Carmelo Baglivo, Luca Galofaro, Rooma. Eripreemiad (2)

  12. STS-54 Physics of Toys

    Science.gov (United States)

    1993-01-01

    Greg Vogt, NASA Headquarters Education Specialist, and Carolyn Sumners, Houston Museum of Natural Science, give an overview of the spaceborne experiments that will take place on the STS-54 Endeavour mission. Mr. Vogt discusses the objectives and procedures of the experiments, which are structured around using toys to show the effects of microgravity. Mr. Vogt and Ms. Sumners then answer questions from the press.

  13. Joint Force Quarterly. Issue 56, 1st Quarter, January 2010

    Science.gov (United States)

    2010-01-01

    tol/comment/ columnists /guest_contributors/ article6789136.ece>. 12 Greg Bruno, Afghanistan’s National Security Forces, Council on Foreign Relations...organized criminal syndicate and narco-trafficking organization in order to maintain its revenue flow. One such criminal activity the FARC engages...international system. It is not a member of the international community, except perhaps in the negative sense (much as organized crime syndicates are

  14. Necessidades básicas das esposas de pacientes infartados na fase aguda do tratamento

    Directory of Open Access Journals (Sweden)

    Edna Ikumi Umebayashi Takahashi

    1990-12-01

    Full Text Available Trata-se de um estudo exploratório que teve por finalidade as necessidades básicas das esposas de pacientes infartados, na fase aguda do tratamento. Foi utlizado como referencial para análise os conceitos de Nacessidades Básicas de MASLOW. Os resultados permitiram identificar como principais necessidades afetadas das esposas: segurança, amor e gregária, estima.

  15. NECESSIDADES BÁSICAS DAS ESPOSAS DE PACIENTES INFARTADOS, NA FASE AGUDA DO TRATAMENTO

    Directory of Open Access Journals (Sweden)

    Edna Ikumi Umebayashi Takahashi

    Full Text Available Trata-se de um estudo exploratório que teve por finalidade identificar as necessidades básicas das esposas de pacientes infartados, na fase aguda do tratamento. Foi utilizado como referencial para análise os conceitos de Necessidades Básicas de Maslow. Os resultados permitiram identificar como principais necessidades afetadas das esposas: segurança, amor e gregária, estima.

  16. Necessidades básicas das esposas de pacientes infartados na fase aguda do tratamento

    Directory of Open Access Journals (Sweden)

    Edna Ikumi Umebayashi Takahashi

    Full Text Available Trata-se de um estudo exploratório que teve por finalidade as necessidades básicas das esposas de pacientes infartados, na fase aguda do tratamento. Foi utlizado como referencial para análise os conceitos de Nacessidades Básicas de MASLOW. Os resultados permitiram identificar como principais necessidades afetadas das esposas: segurança, amor e gregária, estima.

  17. Lessons learned: the effect of increased production rate on operation and maintenance of OPG's Western Used Fuel Dry Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    Morton, L.; Smith, N. [Ontario Power Generation, Tiverton, ON (Canada)

    2011-07-01

    In 2010, the Western Used Fuel Dry Storage Facility (WUFDSF) located at Ontario Power Generation's (OPG's) Western Waste Management Facility in Tiverton, ON, transferred, processed and stored a record-high number of Dry Storage Containers (DSC's) from Bruce Power's nuclear generating stations. The WUFDSF has been in operation since 2002. The facility transfers, processes, and stores the used fuel from the Bruce Power generating stations located in Tiverton, Ontario. As per a contractual agreement between OPG and Bruce Power, an annual DSC production and transfer schedule is agreed to between the two parties. In 2010, an increased annual production rate of 130 DSC's was agreed to between OPG and Bruce Power. Throughout 2007, 2008 and 2009, several facility modifications had been completed in anticipation of the increased production rate. These modifications included: Installation and commissioning of a second set of welding consoles; Addition of a second vacuum drying system; Procurement of a second transfer vehicle; and, Installation of a bulk gas system for welding cover gas. In 2010, the increased production rate of 130 DSC's/year came into effect. Throughout 2010, significant lessons learned were gained related to the impact of such a high production rate on the operation and maintenance of the facility. This paper presents the challenges and successes of that operation. The facility successfully achieved its production target with no safety incidents. This high rate of production is planned to continue for several years at the facility. Some challenges continue and these are being assessed and incorporated into the facility's business plan. In order to continue being successful, the facility must look to the future for opportunities for improvement and efficiencies to be gained. (author)

  18. Lessons learned: the effect of increased production rate on operation and maintenance of OPG's Western Used Fuel Dry Storage Facility

    International Nuclear Information System (INIS)

    Morton, L.; Smith, N.

    2011-01-01

    In 2010, the Western Used Fuel Dry Storage Facility (WUFDSF) located at Ontario Power Generation's (OPG's) Western Waste Management Facility in Tiverton, ON, transferred, processed and stored a record-high number of Dry Storage Containers (DSC's) from Bruce Power's nuclear generating stations. The WUFDSF has been in operation since 2002. The facility transfers, processes, and stores the used fuel from the Bruce Power generating stations located in Tiverton, Ontario. As per a contractual agreement between OPG and Bruce Power, an annual DSC production and transfer schedule is agreed to between the two parties. In 2010, an increased annual production rate of 130 DSC's was agreed to between OPG and Bruce Power. Throughout 2007, 2008 and 2009, several facility modifications had been completed in anticipation of the increased production rate. These modifications included: Installation and commissioning of a second set of welding consoles; Addition of a second vacuum drying system; Procurement of a second transfer vehicle; and, Installation of a bulk gas system for welding cover gas. In 2010, the increased production rate of 130 DSC's/year came into effect. Throughout 2010, significant lessons learned were gained related to the impact of such a high production rate on the operation and maintenance of the facility. This paper presents the challenges and successes of that operation. The facility successfully achieved its production target with no safety incidents. This high rate of production is planned to continue for several years at the facility. Some challenges continue and these are being assessed and incorporated into the facility's business plan. In order to continue being successful, the facility must look to the future for opportunities for improvement and efficiencies to be gained. (author)

  19. 75 FR 78244 - Emergency Access Advisory Committee; Announcement of Establishment, and of Members and Co...

    Science.gov (United States)

    2010-12-15

    ...--Bruce McFarlane. Gallaudet University--Norman Williams. Hearing, Speech & Deafness Center--Donna Platt... Mather. U.S. Department of Transportation, NHTSA--Laurie Flaherty. Verizon Communications--Kevin Green...

  20. 77 FR 69623 - Granting of Request for Early Termination of the Waiting Period Under the Premerger Notification...

    Science.gov (United States)

    2012-11-20

    ... Corporation. 20121393 G South Mississippi Electric Power Association; Batesville, Generation Holdings, LLC... Pharmaceuticals Corp.; Bruce Kovner. 20130078 G Exxon Mobil Corporation; Denbury Resources Inc.; Exxon Mobil...

  1. "Kolmas rahu" / Ilmar Mikiver

    Index Scriptorium Estoniae

    Mikiver, Ilmar, 1920-2010

    2008-01-01

    uurimiskeskuse Project On Transitional Democracies presidendi Bruce P. Jacksoni rahuperioodidest Lääne tsivilisatsioonis. Lähemalt "kolmandast" Euroopa rahust ehk Balkani rahust kui NATO võimalusest

  2. Fuel deposits, chemistry and CANDU reactor operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    2013-01-01

    'Hot conditioning' is a process which occurs as part of commissioning and initial start-up of each CANDU reactor, the first being the Nuclear Power Demonstration-2 reactor (NPD). Later, understanding of the cause of the failure of the Pickering Unit 1 G16 fuel channel led to a revised approach to 'hot conditioning', initially demonstrated on Bruce Unit 5, and subsequently utilized for each CANDU unit since. The difference being that during 'hot conditioning' of CANDU heat transport systems fuel was not in-core until Bruce Unit 5. The 'hot conditioning' processes will be briefly described along with the consequences to fuel. (author)

  3. Environmental assessment: challenges and opportunities

    International Nuclear Information System (INIS)

    Hilbig, J.; Moffett, D.; Beri, K.

    2007-01-01

    As part of a $4.5 billion investment,Bruce Power is refurbishing Bruce A Units 1 and 2, having successfully completed an environmental assessment to return these units to service after a lay-up of almost 10 years. The project includes implementing a series of refurbishments and upgrades which will enhance safety, increase electricity generation capacity and improve reliability for the 30-year extended life of the units. This paper describes four challenges that were successfully managed during the extensive environmental assessment: (i) defining the scope of the Project; (ii) understanding the EA trigger under the Canadian Environmental Assessment Act; (iii) maintaining an effective relationship with the regulatory agencies; and (iv) managing stakeholder communications. (author)

  4. Environmental assessment: challenges and opportunities

    International Nuclear Information System (INIS)

    Hilbig, J.; Moffett, D.; Beri, K.

    2007-01-01

    As part of a $4.5 billion investment, Bruce Power is refurbishing Bruce A Units 1 and 2, having successfully completed an environmental assessment to return these units to service after a lay-up of almost 10 years. The project includes implementing a series of refurbishments and upgrades which will enhance safety, increase electricity generation capacity and improve reliability for the 30-year extended life of the units. This paper describes four challenges that were successfully managed during the extensive environmental assessment: (i) defining the scope of the Project; (ii) understanding the EA trigger under the Canadian Environmental Assessment Act; (iii) maintaining an effective relationship with the regulatory agencies; and (iv) managing stakeholder communications. (author)

  5. Plaadid / Priit Hõbemägi

    Index Scriptorium Estoniae

    Hõbemägi, Priit, 1957-

    2006-01-01

    Uutest heliplaatidest Bruce Springsteen "We Shall Overcome", Langoth "Grounding", Tool "10000 Days", Pet Shop Boys "Fundamental", "Wicked Jazz Sounds 2", Terminaator "Nagu esimene kord", Jamie Foxx "Unpredictable"

  6. The South African Society of Anaesthesiologists initiative to support ...

    African Journals Online (AJOL)

    4 ... Bruce Biccard. Research requires protected research time, but this time requires ... published literature reflect predominantly European and North. American ... States academic anaesthesiologists by citation bibliometrics. Anaesthesia.

  7. Upgrading primary heat transport pump seals

    International Nuclear Information System (INIS)

    Graham, T.; Metcalfe, R.; Rhodes, D.; McInnes, D.

    1995-01-01

    Changes in the operating environment at the Bruce-A Nuclear Generating Station created the need for an upgraded Primary Heat Transport Pump (PHTP) seal. In particular, the requirement for low pressure running during more frequent start-ups exposed a weakness of the CAN2 seal and reduced its reliability. The primary concern at Bruce-A was the rotation of the CAN2 No. 2 stators in their holders. The introduction of low pressure running exacerbated this problem, giving rapid wear of the stator back face, overheating, and thermocracking. In addition, the resulting increase in friction between the stator and its holder increased stationary-side hysteresis and thereby changed the seal characteristic to the point where interseal pressure oscillations became prevalent. The resultant increased hysteresis also led to hard rubbing of the seal faces during temperature transients. An upgraded seal was required for improved reliability to avoid forced outages and to reduce maintenance costs. This paper describes this upgraded 'replacement seal' and its performance history. In spite of the 'teething' problems detailed in this paper, there have been no forced outages due to the replacement seal, and in the words of a seal maintenance worker at Bruce-A, 'it allows me to go home and sleep at night instead of worrying about seal failures.' (author)

  8. 75 FR 23797 - Proposed Information Collection; Assessment of the Business Requirements and Benefits of Enhanced...

    Science.gov (United States)

    2010-05-04

    ...-9445. Dated: April 27, 2010. Bruce K. Quirk, Land Remote Sensing Program Coordinator. [FR Doc. 2010..., bridges, coastlines, rivers, forests and other landscape characteristics. These data provide an...

  9. BUILDING THE FORCE OF THE FUTURE: A NEW CALL TO ATTRACT, HIRE AND RETAIN THE BEST AND BRIGHTEST TO AIR FORCE CIVIL SERVICE

    Science.gov (United States)

    2015-10-25

    Graduation Requirements Advisors: Dr . Gregory F. Intoccia and Dr . Patricia Lessane Maxwell Air Force Base, Alabama 25 October 2015 DISTRIBUTION A...support while I was diverting much of my free time and attention to this graduate program. I appreciate my research advisors Dr . Greg Intoccia and Dr ...underutilized USAJOBS, the federal government job search engine, as compare to LinkedIn , Career Builders and Monster. Only 8.8 percent of the

  10. TA53:19 Reverb Chamber Quick-Look

    Energy Technology Data Exchange (ETDEWEB)

    Bishofberger, Kip A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-05-19

    Within Building 19 of TA-53, a screen room has been evaluated for use as a reverb chamber (with deep gratitude to Dale Dalmas and Greg Dale for their assistance). With minimal additional sealing of the chamber, we expect the Q to increase even more, and thus field levels for the same RF source power. Future studies need to determine leakage field levels, which will define maximum achievable field levels.

  11. ACT-R/E: An Embodied Cognitive Architecture for Human-Robot Interaction

    Science.gov (United States)

    2013-01-01

    Threaded Cognition: An Integrated Theory of Concurrent Multitasking . Psychological Review, 115(1), 101–130, http://dx.doi.org/10.1037/0033-295X...Trafton, Naval Research Laboratory, Washington, DC, USA Email : greg.trafton@nrl.navy.mil Laura Hiatt, Naval Research Laboratory, Washington, DC, USA Email ...laura.hiatt@nrl.navy.mil Anthony Harrison, Naval Research Laboratory, Washington, DC, USA Email : anthony.harrison@nrl.navy.mil Frank Tamborello, Naval

  12. Proposed Closure of Myrtle Beach AFB, South Carolina

    Science.gov (United States)

    1990-07-01

    royal fern (Osmunda regalis), poison ivy (Toxicodendron radicans), and cane (Arundinaria gigantea). Common vines are yellow jasmine (Gelsemium... Ledbetter , Major, U.S. Air Force, Attorney, AFRCE-BMS/DES B.S., 1973, Mathematics, University of Georgia. Athens M.A., 1978, 1 ublic Administration...Richard Garthe F. Lee Howell Murray Geddes Sharon F. Howell Peggy J. Geddes Gary Hoyve Fred G. Gerty Greg Hucks C-5 Jeannine Hucks Jessie R. Lee Lacy K

  13. A Strategy for American Power: Energy, Climate and National Security

    Science.gov (United States)

    2008-06-01

    For example, Greg Mankiw , Harvard economist and former chair of President Bush’s Council of Economic Advisors, has proposed phasing in a $1 per...International Energy Barrier By Amy Myers Jaffe 77 Chapter V: Overcoming the Economic Barriers to Climate Change and Energy Security By Jason Furman (lead...Hamilton Project. He previously served in the Clinton administration and at the Council of Economic Advisers, the National Economic Council, and the World

  14. Group Centric Networking: Addressing Information Sharing Requirements at the Tactical Edge

    Science.gov (United States)

    2016-04-10

    Group Centric Networking: Addressing Information Sharing Requirements at the Tactical Edge Bow-Nan Cheng, Greg Kuperman, Patricia Deutsch, Logan...been a large push in the U.S. Department of Defense to move to an all Internet Protocol (IP) infrastructure, particularly on the tactical edge . IP and...lossy links, and scaling to large numbers of users. Unfortunately, these are the exact conditions military tactical edge networks must operate within

  15. The Marine Corps Physical Fitness Test: The Need to Replace it with a Combat Fitness Test

    Science.gov (United States)

    2008-02-19

    unforeseen emergencies.”1 Crossfit , a website-based workout program, has popularized the en vogue, yet relatively old concept of “functional fitness...Sports; 1996. <http://www.cdc.gov/nccdphp/sgr/sgr.htm> 2 Greg Glassman, “What is Fitness?” Crossfit Journal, October 2002, 1-2. 3 human...short, intense workouts aimed at increasing power, speed, and strength. Additionally, Crossfit explains the crossover between the three pathways

  16. Open Education Week Panel Discussion

    OpenAIRE

    Doolittle, Peter; Hart, Heath; Hartman, Greg; Seyam, Mohammed; Walz, Anita R.

    2015-01-01

    Introduction by Julie Speer, Associate Dean for Research & Informatics. Open remarks by Anita Walz, Assessment, Open Education & Online Learning Environments Librarian. Mohammed Seyam discusses the value of openly licensed material as a student, research, and graduate assistant. Heath Hart reflects on his adoption of an open educational resource and a (subscribed) online textbook in, “A Rousing Success and an Unmitigated Disaster.” Greg Hartman discusses his experiences authoring open-source ...

  17. JULIANO EL APÓSTATA Y LA EPISCOPALIS AUDIENTIA

    Directory of Open Access Journals (Sweden)

    Francisco Cuena Boy

    2017-06-01

    Full Text Available Starting from the understanding of the episcopalis audientia as a special type of arbitration, this work offers a reasonable interpretation of the meaning of three texts (Iul. ep. 114.437a, Greg. Nac. or. 4.96 and Sozom. hist. eccl. 5.18.1that seemed to support prima facie the idea that Julian the Apostate abolished the civil jurisdiction allegedly attributed to the bishops by Constantine.

  18. Finding The Limit: The Strategic Potential Of The Network Based Actor

    Science.gov (United States)

    2016-12-01

    2001, Senate Report No. 351, United States Congressional Serial Set number 14750, (Washington, DC: United States Government Printing Office, 2003...93 Greg Smith, “Bin Laden Bankrolled Kahane Killer Defense,” New York Daily News, October 9, 2002, http://www.nydailynews.com/archives...news/bin-laden-bankrolled-kahane- killer -defense-article- 1.499584. 94 Indictment, Document 218–1, United States of America v. Muhamed Mubayyid et al

  19. Koorimuusika täidab õhtuid / Ave Sopp

    Index Scriptorium Estoniae

    Sopp, Ave

    2003-01-01

    Portlandi ülikooli kammerkoori kontserdist Pärnu Ranna kõlakojas 29. juunil, dirigent Bruce Browne. Norrköpingi muusikaseltsi kammerkoori kontserdist Pärnu Eliisabeti kirikus 2. juulil, dirigent Michael Bruze

  20. Plaadid / Margit Tõnson

    Index Scriptorium Estoniae

    Tõnson, Margit, 1978-

    2004-01-01

    Uutest heliplaatidest "Maria Rita", "Between Heaven and Earth", Marilyn Manson "Lest We Forget. The Best Of", Phil Collins "Love Songs", Dizzee Rascal "Showtime", Bruce Hornsby "Halcyon Days", Bill Frisell "Unspeakable"

  1. Understanding person perception.

    Science.gov (United States)

    Young, Andrew W; Bruce, Vicki

    2011-11-01

    Bruce and Young's (1986) theoretical framework was actually a synthesis of ideas contributed by several people. Some of its insights have stood the test of time - especially the importance of using converging evidence from as wide a range of methods of enquiry as possible, and an emphasis on understanding the demands that are made by particular face perception tasks. But there were also areas where Bruce and Young failed to obey their own edicts (emotion recognition), and some topics they simply omitted (gaze perception). We discuss these, and then look at how the field has been transformed by computing developments, finishing with a few thoughts about where things may go over the next few (25?) years. ©2011 The British Psychological Society.

  2. Presidential Green Chemistry Challenge: 2011 Academic Award

    Science.gov (United States)

    Presidential Green Chemistry Challenge 2011 award winner, Professor Bruce H. Lipshutz, designed a novel, second-generation surfactant called TPGS-750-M. It is a designer surfactant composed of safe, inexpensive ingredients.

  3. 78 FR 9945 - Crow Butte Resources, Inc.; Establishment of Atomic Safety and Licensing Board

    Science.gov (United States)

    2013-02-12

    ... petitioners comprised of Antonia Loretta Afraid of Bear Cook, Bruce McIntosh, Debra White Plume, Western... Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; Dr. Thomas J. Hirons, Atomic...

  4. 78 FR 31985 - Atomic Safety and Licensing Board Panel; Before the Licensing Board: G. Paul Bollwerk, III...

    Science.gov (United States)

    2013-05-28

    .... Richard E. Wardwell, Dr. Thomas J. Hirons; Crow Butte Resources, Inc. (Marsland Expansion Area... Oglala Sioux Tribe (OST) and petitioners Antonia Loretta Afraid of Bear Cook, Bruce McIntosh, Debra White...

  5. Adaptive Origami for Efficiently Folded Structures

    Science.gov (United States)

    2016-02-01

    heating. Although a large fold angle at a high temperature is desirable in order to extrapolate the origami geometry toward closure, more emphasis is...AFRL-RQ-WP-TR-2016-0020 ADAPTIVE ORIGAMI FOR EFFICIENTLY FOLDED STRUCTURES James J. Joo and Greg Reich Design and Analysis Branch... ORIGAMI FOR EFFICIENTLY FOLDED STRUCTURES 5a. CONTRACT NUMBER In-house 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 61102F 6. AUTHOR(S) James J

  6. Earthquake at 40 feet

    Science.gov (United States)

    Miller, G. J.

    1976-01-01

    The earthquake that struck the island of Guam on November 1, 1975, at 11:17 a.m had many unique aspects-not the least of which was the experience of an earthquake of 6.25 Richter magnitude while at 40 feet. My wife Bonnie, a fellow diver, Greg Guzman, and I were diving at Gabgab Beach in teh outer harbor of Apra Harbor, engaged in underwater phoyography when the earthquake struck. 

  7. Adaptive Standard Operating Procedures for Complex Disasters

    Science.gov (United States)

    2017-03-01

    Firefighters stuck in Ga . awaiting orders,” Greg Bluestein, Associated Press, September 7, 2005. 77 Sobel and Leeson, “Government’s Response to Hurricane...partial meltdowns in Reactors 2 and 3 as well as gas explosions that devastated several of the containment buildings, leaking radioactive material into... Behaviour in Built Environments,” Proceedings of the 30th eCAADe Conference 1, (2012): 532. 60 autonomous agents, which are capable of interacting with

  8. Geotechnical Evaluation of the Brownsville Levee Cracking and Partial Slope Failure

    Science.gov (United States)

    2017-06-01

    Journal 46: 1-9. Robertson, P. K. 2014. Soil behaviour type from the CPT: An update. Signal Hill, CA: Greg Drilling and Testing, Inc. Stubbs, M...shall be printed on paper containing 30% post- consumer fiber (30 PC). All deliverables shall also be furnished in electronic fonnat. Electronic...f. All written reports shall be printed on paper containing 30% post- consumer fiber (30 PC). All deliverables shall also be furnished in electronic

  9. A Cost Analysis of the Department of the Navy Humanitarian Assistance and Disaster Response to the 2011 Tohoku Earthquake and Tsunami

    Science.gov (United States)

    2012-06-01

    to Ms. Molly Ringstad at the OASN (FM&C), LCDR Frank Semilla and CDR Frederick Dini from the COMPACFLT, and MAJ Greg Johnson and Mr. Eric Taylor of...coordinates the reporting and collecting of costs through the USPACOM ( Semilla , 2011). Units reported costs daily during the early months of Operation...reimbursed to units operating under the COMPACFLT. According to Lieutenant Commander Semilla (2011), the “COMPACFLT received about $27.8M in OHDACA

  10. Cloud Service Provider Methods for Managing Insider Threats: Analysis Phase 1

    Science.gov (United States)

    2013-11-01

    of Standards and Technology (NIST) Special Publication 800-145 (NIST SP 800-145) defines three types of cloud services : Software as a Service ( SaaS ...among these three models. NIST SP 800-145 describes the three service models as follows: SaaS —The capability provided to the consumer is to use the...Cloud Service Provider Methods for Managing Insider Threats: Analysis Phase I Greg Porter November 2013 TECHNICAL NOTE CMU/SEI-2013-TN-020

  11. Understanding Tumor Dormancy as a Means of Secondary Prevention

    Science.gov (United States)

    2015-10-14

    Hughes Medical Institute • National Philanthropic Trust • PEW Charitable Trust • 5 R01 HG005238-04 Greg Hannon has been replaced as the Primary...OVERLAP: None NBCC (Hannon) 10/10/13 – 10/09/15 0.00 calendar* National Philanthropic Trust Research and analysis activities in support of...Investigator/Senior Personnel NBCC (Hannon) 10/10/13 – 10/09/14 0.00 calendar* National Philanthropic Trust Research and analysis activities in

  12. The hybrid Monte Carlo Algorithm and the chiral transition

    International Nuclear Information System (INIS)

    Gupta, R.

    1987-01-01

    In this talk the author describes tests of the Hybrid Monte Carlo Algorithm for QCD done in collaboration with Greg Kilcup and Stephen Sharpe. We find that the acceptance in the glubal Metropolis step for Staggered fermions can be tuned and kept large without having to make the step-size prohibitively small. We present results for the finite temperature transition on 4 4 and 4 x 6 3 lattices using this algorithm

  13. A More Nuanced Approach to the Fourth Estate

    Science.gov (United States)

    2012-05-17

    and accurately.117 Veteran reporter Joe Galloway writing before the start of OIF, stated “Any reporter who has the [courage] to go into combat is...arguably crossing the line from objective reporter to active combatant.119 Boston Globe Journalist, Scott Bernard Nelson, also disclosed that he...www.brookings.edu/comm/events/20030617.pdf (accessed September 14, 2011). Donnelly, Mike, Mitch Gettle, Greg Scott , and Dana Warr. “Embedded Journalism: How War

  14. 2005 Tri-Service Infrastructure Systems Conference and Exhibition. Volume 12. Tracks 15, 16 and 17

    Science.gov (United States)

    2005-08-04

    O’Leary Seepage Collection & Control Systems: The Devil is in the Details , by John W. France Dewey Dam Seismic Assessment, by Greg Yankey Seismic...efficiency in new construction and renovations • Reduce dependence on fossil fuels • Conserve water resources • Improve energy security DDC /UMCS is...in this country where the electrical infrastructure had been decimated . As a student of the Bible, I wanted a chance to possibly see the ancient

  15. A Canadian Effort to Address Fractions Teaching and Learning Challenges

    Science.gov (United States)

    Yearley, Shelley; Bruce, Catherine D.

    2014-01-01

    Teaching and learning fraction concepts provides challenges in primary schools all over the world. In this article, Shelley Yearley and Catherine Bruce describe a fractions-based research project conducted in Ontario, Canada.

  16. Fulltext PDF

    Indian Academy of Sciences (India)

    Journal of Earth System Science wishes to place on record the valuable assistance ... Corliss Bruce, Duke University, Durham, North Carolina, United States ... Mitra Supriyo, Indian Institute of Science Education and Research, Kolkata.

  17. Pop / Tõnu Kaalep

    Index Scriptorium Estoniae

    Kaalep, Tõnu, 1966-2018

    2005-01-01

    Heliplaatidest: Robert Plant "Mighty Rearranger", Audioslave "Out of Exile", Bruce Springsteen "Devils & Dust", Bobby Valentino "Disturbing Tha Peace Presents Bobby Valentino", 22 Pistepirkko "Drops & Kicks", Basement Jaxx "The Singles", Kaiser Chiefs "Employment"

  18. A progress review of Ontario Hydro's nuclear generation and heavy water production programs

    International Nuclear Information System (INIS)

    Kee, F.J.; Woodhead, L.W.

    Performance and economics of CANDU reactors in service are described. Progress of commissioning, construction and planning of reactors at Pickering, Bruce, and Darlington is outlined. Heavy water production is reviewed. (E.C.B.)

  19. Larval Fish Identification from Cruises at Oahu, TC-85-04, TC-85-05, TC-86-02, TC-86-04

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Four cruises aboard the NOAA ship Townsend Cromwell were conducted, collectors included George Boehlert and Bruce Mundy. Two transects, oriented in an east-west...

  20. Gregório Ronca and Ermanno Stradelli: navy officer and anthropologist in the Amazon

    OpenAIRE

    Cappelli, Vittorio; Universita’ Della Calabria

    2013-01-01

    The intervention is intended to describe, comment and compare the experiences of two Italian travellers in Amazonas between the Eighteenth and the Nineteenth Centuries. The explorations and acts of Ermanno Stradelli, ethnologist who was been living and working in Amazonas since 1879 to 1926, and the explorative mission of Gregorio Ronca, Italian Navy’s officer, who in 1904 travelled from the Antilles to the Guyanas and Amazonas, going up the Amazon from Belém to Manaus and Iquitos, in order t...

  1. Gregório Ronca and Ermanno Stradelli: navy officer and anthropologist in the Amazon

    OpenAIRE

    Cappelli, Vittorio

    2012-01-01

    The intervention is intended to describe, comment and compare the experiences of two Italian travellers in Amazonas between the Eighteenth and the Nineteenth Centuries. The explorations and acts of Ermanno Stradelli, ethnologist who was been living and working in Amazonas since 1879 to 1926, and the explorative mission of Gregorio Ronca, Italian Navy’s officer, who in 1904 travelled from the Antilles to the Guyanas and Amazonas, going up the Amazon from Belém to Manaus and Iquitos, in order t...

  2. The Gas Sampling Interval Effect on V˙O2peak Is Independent of Exercise Protocol.

    Science.gov (United States)

    Scheadler, Cory M; Garver, Matthew J; Hanson, Nicholas J

    2017-09-01

    There is a plethora of gas sampling intervals available during cardiopulmonary exercise testing to measure peak oxygen consumption (V˙O2peak). Different intervals can lead to altered V˙O2peak. Whether differences are affected by the exercise protocol or subject sample is not clear. The purpose of this investigation was to determine whether V˙O2peak differed because of the manipulation of sampling intervals and whether differences were independent of the protocol and subject sample. The first subject sample (24 ± 3 yr; V˙O2peak via 15-breath moving averages: 56.2 ± 6.8 mL·kg·min) completed the Bruce and the self-paced V˙O2max protocols. The second subject sample (21.9 ± 2.7 yr; V˙O2peak via 15-breath moving averages: 54.2 ± 8.0 mL·kg·min) completed the Bruce and the modified Astrand protocols. V˙O2peak was identified using five sampling intervals: 15-s block averages, 30-s block averages, 15-breath block averages, 15-breath moving averages, and 30-s block averages aligned to the end of exercise. Differences in V˙O2peak between intervals were determined using repeated-measures ANOVAs. The influence of subject sample on the sampling effect was determined using independent t-tests. There was a significant main effect of sampling interval on V˙O2peak (first sample Bruce and self-paced V˙O2max P sample Bruce and modified Astrand P sampling intervals followed a similar pattern for each protocol and subject sample, with 15-breath moving average presenting the highest V˙O2peak. The effect of manipulating gas sampling intervals on V˙O2peak appears to be protocol and sample independent. These findings highlight our recommendation that the clinical and scientific community request and report the sampling interval whenever metabolic data are presented. The standardization of reporting would assist in the comparison of V˙O2peak.

  3. Wolff-Parkinson-White Syndrome and Accessory Pathways

    Science.gov (United States)

    ... the American Heart Association Cardiology Patient Page Wolff-Parkinson-White Syndrome and Accessory Pathways James Kulig , Bruce ... rate, which can be dangerous. What is Wolff-Parkinson-White Syndrome? Wolff-Parkinson-White syndrome (WPW) is ...

  4. From Lyme Disease to Art and Advocacy | NIH MedlinePlus the Magazine

    Science.gov (United States)

    ... Tick Bites Follow us From Lyme Disease to Art and Advocacy Bruce Davidson always enjoyed the outdoors. ... his recovery, Davidson has become "hyper-focused" on art and uses these talents to help others. "I ...

  5. What Is ALS?

    Science.gov (United States)

    ... a wealth of new scientific understanding regarding the physiology of this disease. Studies all over the world, ... boxing champion Ezzard Charles, NBA Hall of Fame basketball player George Yardley, golf caddie Bruce Edwards, musician ...

  6. Larval Fish Identification from Cruises at Oahu, TC-88-03

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — One cruise aboard the NOAA ship Townsend Cromwell was conducted during 14 April-3 May 1988. Collectors included George Boehlert, Bruce Mundy, Ronald Yoshimoto, Keith...

  7. Plaat : Üle vaade / Lennart Beat

    Index Scriptorium Estoniae

    Beat, Lennart, pseud., 1969-

    2006-01-01

    Heliplaatidest: Michael Jackson "Rock With You", Blondie "Sight & Sound", Depeche Mode "Speak & Spell", Music For The Masses, "Violator", Bruce Springsteen "We Shall Overcome", Richard Hawley "Coles Corner", Juanes "Mi Sangre", A-Rühm "Leegion"

  8. Imitation game

    Science.gov (United States)

    Follows, Michael

    2017-06-01

    In response to Bruce Knuteson’s Forum article “Figuring out a handshake” (February p17), in which he suggested that the replication crisis in science could be solved if scientists sold their research.

  9. Shift manager workload assessment - A case study

    International Nuclear Information System (INIS)

    Berntson, K.; Kozak, A.; Malcolm, J. S.

    2006-01-01

    In early 2003, Bruce Power restarted two of its previously laid up units in the Bruce A generating station, Units 3 and 4. However, due to challenges relating to the availability of personnel with active Shift Manager licenses, an alternate shift structure was proposed to ensure the safe operation of the station. This alternate structure resulted in a redistribution of responsibility, and a need to assess the resulting changes in workload. Atomic Energy of Canada Limited was contracted to perform a workload assessment based on the new shift structure, and to provide recommendations, if necessary, to ensure Shift Managers had sufficient resources available to perform their required duties. This paper discusses the performance of that assessment, and lessons learned as a result of the work performed during the Restart project. (authors)

  10. Perspectives | Page 3 | IDRC - International Development Research ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2017-05-09

    Ideas from the global climate change hotspot research. What are the major findings from the research happening in the three climate change hotspot areas? Published date: May 9, 2017. Author(s): Bruce Currie-Alder ...

  11. Measurements and Counts for Notacanthidae Specimens

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Taxonomic data were collected for specimens of deep-sea spiny eels (Notacanthidae) from the Hawaiian Ridge by Bruce C. Mundy. Specimens were collected off the north...

  12. Book Review of 'The Metropolitan Revolution, How Cities and Metros are fixing our Broken Policies and Fragile Economy'

    OpenAIRE

    Fitzpatrick, Miriam

    2014-01-01

    Book Reviews for Architecture Ireland of 'The Metropolitan Revolution, How Cities and Metros are fixing our Broken Policies and Fragile Economy', by Bruce Katz and Jennifer Bradley, Published by Brookings Institution Press, 288 pages.

  13. Posthuman Metamorphosis: Narrative and Systems, New

    Directory of Open Access Journals (Sweden)

    Elke D'hoker

    2009-10-01

    Full Text Available Review of Bruce Clarke, Posthuman Metamorphosis: Narrative and Systems, New
    York: Fordham University Press, 2008. 242 pages.
    978-0-8232-2580-8 (hardback
    978-0-8232-2581-5 (paperback

  14. Perspective: Semantic Data Management for the Home

    Science.gov (United States)

    2009-02-01

    ten to the new U2 album off of Harry’s music player on the nice stereo speakers, while he is visiting. Crash: Mike’s young nephew Oliver...files where owner=Greg. However, it cannot deter- mine the relationship between the queries all files where type= Music and all files where album =The... music , images, videos, as well as more conventional files (e.g., financial records and contact lists). In-home networks enable these de- vices to

  15. Exotic Optical Beam Classes for Free-Space Communication

    Science.gov (United States)

    2016-03-24

    wandering of an optical vortex is one of the significant problems with the application of vortex beams to FSO applications. From a geometrical optics ...AFRL-AFOSR-VA-TR-2016-0131 Exotic optical beam classes for free-space communication Greg Gbur UNIVERSITY OF NOTH CAROLINA AT CHARLOTTE Final Report...12-2015 4. TITLE AND SUBTITLE Exotic optical beam classes for free-space communication 5a. CONTRACT NUMBER 5b. GRANT NUMBER FA9550-13-1-0009 5c

  16. The Right US Strategy for Iran

    Science.gov (United States)

    2007-04-01

    King , King of Kings , King of countries containing all kinds of men, King in this great earth far and wide, son of Hystaspes, an Achaemenian , a...Highlights of the Iraq Strategy Review, January 2007, http://www.whitehouse.gov/nsc/iraq/2007/iraq-strategy011007. pdf . 13 Greg Jaffe and Neil King Jr...do if Iraq Implodes?” August 2006, Brookings Report, (Washington DC) http://www.brook.edu/views/articles/pollack/20060820. pdf . 21 Neil King Jr. and

  17. Collaborative wisdom from pervasive logic to effective operational leadership

    CERN Document Server

    Park, Greg

    2013-01-01

    Greg Park argues that corporate superstars collapse not primarily due to poor products, inadequate market penetration, financial mismanagement or self-aggrandisement, but rather by a leadership lacking the fundamental values, principles, perspectives, attributes and capabilities for long term organisational survival. The resultant inadequate cognitive mental process of leadership invites inevitable failure, through loss of confidence, motivation, cohesion, advocacy and energy amongst the community of stakeholders. Collaborative wisdom is the existence within the dominant coalition of an organi

  18. Role of conspecific cues and sugars in the settlement of cyprids of the barnacle, Balanus amphitrite

    Digital Repository Service at National Institute of Oceanography (India)

    Khandeparker, L.; Anil, A.C.

    . 4912. References Bielecki, J., Chan, B.K.K., Høeg, J.T. & Sari, A. (2009). Antennular sensory organs in cyprids of balanomorphan cirripedes: standardizing terminology using Megabalanus rosa. Biofouling 25, 203–214. Bruce,A.,Dennis...

  19. Pop / Lauri Tikerpe

    Index Scriptorium Estoniae

    Tikerpe, Lauri

    2007-01-01

    Heliplaatidest: Laurent Garnier, Bugge Wesseltoft, Philippe Nadaud, Benjamin Rippert "Public Out Burst", Enthroned "Tetra Karcist", Bruce Springsteen with the Sessions Band "Live in Dublin", Tuxedomoon "Vapour Trails", Atreyu "Lead Sails Paper Anchor", Still Remains "The Serpent"

  20. Plaadid / Mart Normet

    Index Scriptorium Estoniae

    Normet, Mart, 1979-

    2006-01-01

    Uutest heliplaatidest Rules of the Deep "Next Evolution", "Monsieur Gainsbourg Revisited", Gotan Priject "Lunatico", "Corinne bailey Rae", Bruce Springsteen & The E Street Band "Hammersmith Odeon London'75", Yeah Yeah yeahs "Show Your Bones", Dave Lindholm "Dave & Dobro"

  1. Water, solute and heat transport in the soil: the Australian connection

    Science.gov (United States)

    Knight, John

    2016-04-01

    The interest of Peter Raats in water, solute and heat transport in the soil has led to scientific and/or personal interactions with several Australian scientists such as John Philip, David Smiles, Greg Davis and John Knight. Along with John Philip and Robin Wooding, Peter was an early user of the Gardner (1958) linearised model of soil water flow, which brought him into competition with John Philip. I will discuss some of Peter's solutions relevant to infiltration from line and point sources, cavities and basins. A visit to Canberra, Australia in the early 1980s led to joint work on soil water flow, and on combined water and solute movement with David Smiles and others. In 1983 Peter was on the PhD committee for Greg Davis at the University of Wollongong, and some of the methods in his thesis 'Mathematical modelling of rate-limiting mechanisms of pyritic oxidation in overburden dumps' were later used by Peter's student Sjoerd van der Zee. David Smiles and Peter wrote a survey article 'Hydrology of swelling clay soils' in 2005. In the last decade Peter has been investigating the history of groundwater and vadose zone hydrology, and recently he and I have been bringing to light the largely forgotten work of Lewis Fry Richardson on finite difference solution of the heat equation, drainage theory, soil physics, and the soil-plant-atmosphere continuum.

  2. Arun Kundnani (2014 The Muslims are Coming! Islamophobia, Extremism and the Domestic War on Terror. London: Verso.

    Directory of Open Access Journals (Sweden)

    Greg Martin

    2015-10-01

    Full Text Available Martin Luther King Jr understood the link between individual violence at home and state violence abroad. In part of his message that is often downplayed, he told an audience at Riverside Church, New York in 1967 that the promotion of nonviolent direct action (or the prevention of violent extremism among young Americans depended on opposing the violence of US foreign policy in places like Vietnam. Arun Kundnani ends his book arguing this point remains as valid today in the global war on terror. Indeed, in many ways, the material presented in the book paints a depressingly familiar picture of state secrecy and surveillance, the normalisation of preventative measures in the post-9/11 era, governments instilling fear and anxiety across populations, and the criminalisation of formerly lawful activities. It is now beyond dispute that these developments have eroded human rights and civil liberties in Western societies. But they have also impinged, more broadly, upon social relations and political processes. Not surprisingly, this has impacted Muslim communities the most because relations of trust have been eroded in the domestic war on terror. Download the PDF file from this page to read Greg Martin's complete review of Arun Kundnani's book. Download the PDF file to read the complete review of Arun Kundnan's book by Greg Martin.

  3. Safety benefits from CANDU reactor replacement - a case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  4. Diagnostic impact of thallium scintigraphy and cardiac fluoroscopy when the exercise ECG is strongly positive

    International Nuclear Information System (INIS)

    Chaitman, B.R.; Brevers, G.; Dupras, G.; Lesperance, J.; Bourassa, M.G.

    1984-01-01

    We studied 83 men, who had a chest pain syndrome, no prior history of myocardial infarction, and exercise-induced horizontal or downsloping ST segment depression greater than or equal to 0.2 mV. The 38 patients unable to complete Bruce stage II had a significant increased risk of coronary (0.97 vs 0.71) and multivessel (0.88 vs 0.61) disease (p less than 0.01) compared to the pretest risk; data obtained from exercise-reperfusion thallium scintigraphy and cardiac fluoroscopy did not alter the risk of coronary or multivessel disease. The 45 patients who had ST depression greater than or equal to 0.2 mV and a peak work capacity greater than or equal to Bruce stage III did not have a significant increased risk of coronary (0.76) or multivessel disease (0.44). When both exercise-reperfusion thallium scintigraphy and cardiac fluoroscopy were abnormal in this latter patient subgroup, the post-test risk of multivessel disease was increased from 0.44 to 0.82 (p less than 0.03); when both tests were normal, none of the patients had multivessel disease (p less than 0.03) and only 0.18 had coronary artery disease. Thus, cardiac fluoroscopy and exercise thallium scintigraphy increase the diagnostic content of the strongly positive exercise ECG, particularly in men who have a peak work capacity greater than or equal to Bruce stage III

  5. Safety benefits from CANDU reactor replacement. A case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  6. 2008 wind farm submission requirements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-05-01

    Wind turbines used to generate electricity can have important visual, environmental and amenity impacts depending on their location. Planning can contribute to the provision of renewable energy by enabling wind energy development in appropriate locations in a manner that appropriately balances their environmental, social and economic benefits with any demonstrated visual, environmental and amenity impacts. The County of Bruce, Ontario and member municipalities are attempting to balance these matters in favour of an overall net community benefit. Planning applications need to include sufficient information and explanation to allow the approval authorities to come to a sound and timely decision, in order to facilitate a viable wind energy industry. This document outlined the County of Bruce application requirements in order to assist in the design and siting of proposed wind energy facilities and in preparing planning applications. The County of Bruce official plan and policies for large wind energy conversion systems (LWECS) were presented. Submissions requirements include an environmental screening report; a federal environmental assessment clearance; a prime agricultural land justification report; a general project description; turbine specifications; noise evaluation; shadow flicker calculations; visual effect modelling; NAV Canada/Transport Canada clearance; grid connections and routing; project staging; overshadowing study; electromagnetic interference study; turbine foundation drawings; and an environmental management plan. Other requirements include lot level maps; project area maps; sensitive receptor table; shadow flicker; stage 2 archaeological study; type certification; statement of planning policy conformity; and a submission checklist. 6 refs., 1 tab., 3 appendices.

  7. Uusi heliplaate / Märt Milter

    Index Scriptorium Estoniae

    Milter, Märt

    1999-01-01

    Uute heliplaatide Bruce springsteen "18 Tracks", Add N To "Avant Hard", Incognito "No Time Like The Future", Tom Oetty & The Heartbreakers "Echo", Thec Rentals "Seven More Minutes" Uni "Kosmikud", "Full Of House. Mixed by DJ Dave Garage" tutvustus

  8. Fulltext PDF

    Indian Academy of Sciences (India)

    IAS Admin

    When the two compa- nies produce the same product, they have equal market ..... be thought of as simultaneously choosing their strate- gies from the ..... Roger Bruce Myerson, Nash equilibrium and the history of economic theory, Journal of ...

  9. Selection of maintenance tasks

    Energy Technology Data Exchange (ETDEWEB)

    Dean, B; Rombos, P [Wardrop (W.L.) and Associates Ltd., Winnipeg, MB (Canada)

    1995-10-01

    Two methodologies for maintenance task selection, Reliability Centre Maintenance (RCM) and Degradation Mode Analysis (DMA), are compared with regard to application in the nuclear industry and potential for application at CANDU nuclear power plants. RCM is the favoured one of the two methodologies. It is more thorough than DMA, is well supported within the US nuclear industry, and - with experience in application - is gaining cost effectiveness. There is interest in the use of RCM in other nations, including France and Japan, and it is already being implemented at Bruce A NGS and Bruce B NGS in Canada. DMA lags behind RCM in development and currently there is little experience to support claims of major benefits at reduced cost. Significant advantages over RCM need to be demonstrated if DMA is to gain acceptance in the nuclear industry. (author). 41 refs., 7 tabs., 8 figs.

  10. Selection of maintenance tasks

    International Nuclear Information System (INIS)

    Dean, B.; Rombos, P.

    1995-10-01

    Two methodologies for maintenance task selection, Reliability Centre Maintenance (RCM) and Degradation Mode Analysis (DMA), are compared with regard to application in the nuclear industry and potential for application at CANDU nuclear power plants. RCM is the favoured one of the two methodologies. It is more thorough than DMA, is well supported within the US nuclear industry, and - with experience in application - is gaining cost effectiveness. There is interest in the use of RCM in other nations, including France and Japan, and it is already being implemented at Bruce A NGS and Bruce B NGS in Canada. DMA lags behind RCM in development and currently there is little experience to support claims of major benefits at reduced cost. Significant advantages over RCM need to be demonstrated if DMA is to gain acceptance in the nuclear industry. (author). 41 refs., 7 tabs., 8 figs

  11. Bruce B fuelling-with-flow operations: fuel damage investigation

    Energy Technology Data Exchange (ETDEWEB)

    Manzer, A.M. [CANTECH Associates Ltd., Burlington, Ontario (Canada); Morikawa, D. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada); Hains, A.J.; Cichowlas, W.M. [Nuclear Safety Solutions Limited, Toronto, Ontario (Canada); Roberts, J.G.; Wylie, J. [Bruce Power, Ontario (Canada)

    2005-07-01

    This paper summarizes the fuel bundle damage characterization done by Nuclear Safety Solutions Limited (NSS) and the out-reactor flow visualization tests done at Atomic Energy of Canada Limited (AECL) to reproduce the damage observed on irradiated fuel bundles. The bearing pad damage mechanism was identified and the tests showed that a minor change to the fuelling sequence would eliminate the mechanical interaction. The change was implemented in January 2005. Since then, the bearing pad damage appears to have been greatly reduced based on the small number of discharged bundles inspected to date. (author)

  12. Bruce B fuelling-with-flow operations: fuel damage investigation

    International Nuclear Information System (INIS)

    Manzer, A.M.; Morikawa, D.; Hains, A.J.; Cichowlas, W.M.; Roberts, J.G.; Wylie, J.

    2005-01-01

    This paper summarizes the fuel bundle damage characterization done by Nuclear Safety Solutions Limited (NSS) and the out-reactor flow visualization tests done at Atomic Energy of Canada Limited (AECL) to reproduce the damage observed on irradiated fuel bundles. The bearing pad damage mechanism was identified and the tests showed that a minor change to the fuelling sequence would eliminate the mechanical interaction. The change was implemented in January 2005. Since then, the bearing pad damage appears to have been greatly reduced based on the small number of discharged bundles inspected to date. (author)

  13. Spent fuel bundle counter sequence error manual - BRUCE NGS

    International Nuclear Information System (INIS)

    Nicholson, L.E.

    1992-01-01

    The Spent Fuel Bundle Counter (SFBC) is used to count the number and type of spent fuel transfers that occur into or out of controlled areas at CANDU reactor sites. However if the transfers are executed in a non-standard manner or the SFBC is malfunctioning, the transfers are recorded as sequence errors. Each sequence error message typically contains adequate information to determine the cause of the message. This manual provides a guide to interpret the various sequence error messages that can occur and suggests probable cause or causes of the sequence errors. Each likely sequence error is presented on a 'card' in Appendix A. Note that it would be impractical to generate a sequence error card file with entries for all possible combinations of faults. Therefore the card file contains sequences with only one fault at a time. Some exceptions have been included however where experience has indicated that several faults can occur simultaneously

  14. Veneetsia 11. arhitektuuribiennaal 13.9 - 23.11.2008

    Index Scriptorium Estoniae

    2008-01-01

    Biennaali teema: "Arhitektuur - midagi enamat kui ehitised", kuraator Aaron Betsky. Väljas oli 56 rahvusekspositsiooni. Loetletud biennaali auhinnad, žürii koosseis. Parima rahvusekspositsiooni Kuldlõvi pälvis Poola paviljon "Hotel Polonia. Majade hauatagune elu", autorid Nicolas Grospierre ja Kobas Laksa. Parima projekti Kuldlõvi sai Greg Lynn taaskasutatud mänguasjadest mööbli eest. Kuldlõvi elutöö eest pälvis ameerika arhitekt Frank O. Gehry, arhitektuuriajaloolase elutöö Kuldlõvi ameeriklane James S. Ackerman

  15. Violence and Democracy in Khayelitsha, Governing Crime through the ‘Community’

    OpenAIRE

    Super, Gail

    2015-01-01

    Waving placards that read “Sonele zizikoli, sanele yicrime (we have had enough of crime and thugs),” more than 60 angry residents protested outside the Khayelitsha Police Station on Tuesday. [ . . . ] Residents’ leader Unathi Mabengwana said: “Given the high crime rate in our area, we are of the view that whatever cops do to fight crime here is not enough. We demand that cops should be more harsh when dealing with criminals.” Greg Wagner, spokesman for community safety department said [Member...

  16. Kunst avaliku huvi teenistuses : skulptuur / Reet Varblane

    Index Scriptorium Estoniae

    Varblane, Reet, 1952-

    2007-01-01

    Münsteri skulptuuriprojektidest ("Münster 77, 87, 97, 07"). 30. IX lõppeva "Münster 07ga" (kuraatorid Brigitte Franzen, Kasper König, Carina Plath) kaasnenud kunstihariduslikust programmist, Bruce Naumani tööst "Depressiooni väljak" (2007)

  17. Teaching E-Commerce by Shopping Only Online.

    Science.gov (United States)

    Mangan, Catherine S.

    2000-01-01

    Describes the experiences of Bruce D. Weinberg, an assistant professor of marketing at Boston University (Massachusetts), who is doing all his shopping via the Internet to demonstrate to students what works and what fails when selling in cyberspace. (DB)

  18. Review Article: Holy Terrors: Thinking about Religion after September 11

    OpenAIRE

    Campo, Juan E.

    2003-01-01

    The following is a review article by Juan E. Campo, Religious Studies Department at the University of California, Santa Barbara, on Bruce Lincoln's Holy Terrors: Thinking about Religion after September 11. Chicago: University of Chicago Press, 2003, Pp. 142.

  19. I tõ, Brjus / Katja Tarhanova

    Index Scriptorium Estoniae

    Tarhanova, Katja

    2006-01-01

    Ameerika mängufilmid "Lucky Number Slevin" : režissöör Paul McGuigan ja "16 kvartalit" ("16 Blocks") : režissöör Richard Donner. Mõlemas mängib Bruce Willis, ühes mõrvarit, teises politseinikku

  20. Not a Pound for Air-To-Ground: A Historiographical Analysis on the Genesis of the Multi-Role Fighter

    Science.gov (United States)

    2015-04-01

    Robert M. Quadrennial Defense Review Report. Washington D.C.: Department of Defense, 2010. http://www.defense.gov/qdr/images...dvs=1417624228343~272 (accessed 2 Dec 2014) Stevens, Donald, Bruce Davis, William Stanley, Daniel Norton, Rae Starr, Dnaiel Raymer , John Gibson

  1. Energy for the future

    International Nuclear Information System (INIS)

    1982-01-01

    The history of electrical energy production in Ontario and the surge of energy needs; water, coal and nuclear power are discussed. A look at CRNL, NPD, Pickering A and Bruce B stations is presented. The fission process is explained as well

  2. Enterprise architecture for small and medium enterprise growth

    CSIR Research Space (South Africa)

    Jacobs, D

    2011-05-01

    Full Text Available with the growth of small enterprises into medium enterprises. SMEAG combines the existing growth stage model of Scott and Bruce, the Enterprise Architecture Framework by Hoogervorst, and the EA as Foundation for Business Execution Model by Ross, Weill...

  3. Environmental Investigations and Analyses for Los Angeles-Long Beach Harbors, Los Angeles, California, 1973-1976.

    Science.gov (United States)

    1976-12-01

    Christine Yonai Fred Piltz Ichthyology Jay Carroll Karl Lyde John Helle Scott Ralston S. Ishikawa Steve Subber Catherine Kusick Catherine Terry...Charles Greaves Catherine Link Susan Harrison Julie Thompson Kaoru 0. Kendis Ismay Stanley Randall Kendis Marine Technicians Bruce Adams Gene Mummert

  4. False Advertising and Antitrust Law: Sometimes the Twain Should Meet

    OpenAIRE

    Bruce Colbath; Nadezhda Nikonova

    2014-01-01

    Although it is easier to bring a false advertising claim under the Lanham Act than under the Sherman Act, the Lanham Act’s available remedies are not as robust. Bruce Colbath & Nadezhda Nikonova (Sheppard Mullin)

  5. Sound / Märt Milter

    Index Scriptorium Estoniae

    Milter, Märt

    1998-01-01

    Uutest plaatidest : Billie "Honey To The B", Mainstream "S/T",Lauryn Hill "The Miseducation Of", Babylon Zoo "King Kong Groover", Bryan Adams "On A Day Like Today", Candlebox "Happy Pills", Cher "Believe", Beautiful South "Quench", Bruce Dickinson "The Chemical Wedding", Vangelis "El Greco"

  6. South African Medical Journal - Vol 86, No 5 (1996)

    African Journals Online (AJOL)

    Is there a place for radionuclide bone scintigraphy in the management of radiograph-negative scaphoid trauma? EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. Basil C. Vretlos, Bruce K. Adams, John D. Knotlenbelt, Andrew Lee ...

  7. Notes on some Indo-Pacific Pontoniinae III-IX descriptions of some new genera and species from the Western Indian Ocean and the South China Sea

    NARCIS (Netherlands)

    Bruce, A.J.

    1967-01-01

    CONTENTS Introduction................... 1 III. Anapontonia denticauda Bruce, 1966, from the western Indian Ocean . . 2 IV. Mesopontonia gorgoniophila gen. nov., sp. nov., from the South China Sea 13 V. Metapontonia fungiacola gen. nov., sp. nov., from the western Indian Ocean 23 VI. The genus

  8. Journal of Genetics | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    ... Lanzhou 730070, People's Republic of China; Institute for Applied Ecology, University of Canberra, Bruce ACT 2601, Australia; Ecological Genetics Laboratory, Landcare Research, Private Bag 92170, Auckland, New Zealand; Institute of Natural Sciences, Massey University, North Shore Mail Centre 0632, Auckland, New ...

  9. AFRREV STECH

    African Journals Online (AJOL)

    User

    within the Chinese Room so there is none in a computer program: no .... to fit Bruce with body parts equivalent to those of humans. As a result .... humans, we wonder aloud, if this exercise be called perception, whose is it: ... New York: Image.

  10. 76 FR 45249 - PJM Interconnection, L.L.C.; Supplemental Notice of Staff Technical Conference

    Science.gov (United States)

    2011-07-28

    ... and Government Relations, Comverge, Inc. Bruce Campbell, Director of Regulatory Affairs, Demand...] Dr. Joseph E. Bowring, Market Monitor, Independent Market Monitor for PJM [rtarr9] Frederick (``Stu... Flaherty Beliveau & Pachios LLP representing EnerNOC, Inc. [rtarr9] Dr. Joseph E. Bowring, Market Monitor...

  11. Response to Ecological Risk Assessment Forum Request for Information on the Benefits of PCB Congener-Specific Analyses

    Science.gov (United States)

    In August, 2001, the Ecological Risk Assessment Forum (ERAF) submitted a formal question to the Ecological Risk Assessment Support Center (ERASC) on the benefits of evaluating PCB congeners in environmental samples. This question was developed by ERAF members Bruce Duncan and Cla...

  12. Class Counts: An Overview and Response to Mr. Cooper's Review

    Science.gov (United States)

    Ornstein, Allan

    2009-01-01

    This article presents Allan Ornstein's response to highly respected scholar, Bruce Cooper's review of Ornstein's 2007 book, "Class Counts: Education, Inequality and the Shrinking Middle Class." Here Ornstein attempts to elaborate on a few points that he felt Cooper missed in his review.

  13. [The maximum heart rate in the exercise test: the 220-age formula or Sheffield's table?].

    Science.gov (United States)

    Mesquita, A; Trabulo, M; Mendes, M; Viana, J F; Seabra-Gomes, R

    1996-02-01

    To determine in the maximum cardiac rate in exercise test of apparently healthy individuals may be more properly estimated through 220-age formula (Astrand) or the Sheffield table. Retrospective analysis of clinical history and exercises test of apparently healthy individuals submitted to cardiac check-up. Sequential sampling of 170 healthy individuals submitted to cardiac check-up between April 1988 and September 1992. Comparison of maximum cardiac rate of individuals studied by the protocols of Bruce and modified Bruce, in interrupted exercise test by fatigue, and with the estimated values by the formulae: 220-age versus Sheffield table. The maximum cardiac heart rate is similar with both protocols. This parameter in normal individuals is better predicted by the 220-age formula. The theoretic maximum cardiac heart rate determined by 220-age formula should be recommended for a healthy, and for this reason the Sheffield table has been excluded from our clinical practice.

  14. Failure rate of piping in hydrogen sulphide systems

    International Nuclear Information System (INIS)

    Hare, M.G.

    1993-08-01

    The objective of this study is to provide information about piping failures in hydrogen sulphide service that could be used to establish failures rates for piping in 'sour service'. Information obtained from the open literature, various petrochemical industries and the Bruce Heavy Water Plant (BHWP) was used to quantify the failure analysis data. On the basis of this background information, conclusions from the study and recommendations for measures that could reduce the frequency of failures for piping systems at heavy water plants are presented. In general, BHWP staff should continue carrying out their present integrity and leak detection programmes. The failure rate used in the safety studies for the BHWP appears to be based on the rupture statistics for pipelines carrying sweet natural gas. The failure rate should be based on the rupture rate for sour gas lines, adjusted for the unique conditions at Bruce

  15. Ontario Hydro nuclear - challenges of the future

    International Nuclear Information System (INIS)

    Field, R.

    1996-01-01

    The challenges facing Ontario Hydro Nuclear (OHN), as understood at the time of the conference, are discussed. OHN had many strengths to build on in preparing for the competition ahead, including: extremely competitive production costs, strong technical capabilities, advantages of multiple units, environmental advantages favoring nuclear, strong public support, and improving station performance. Even with these advantages, OHN faced the difficult challenge of improving overall performance in the face of a large debt burden, coupled with the reinvestment demands of aging units at Pickering A and Bruce A. At the time of the conference, Bruce 2 had already been shut down, because the cost of retubing it and replacing its boilers could not be justified. The ''drive to nuclear excellence'' involves the simultaneous achievement of top performance in safety, reliability and cost; and to this end, changes were being made to reverse the trends indicated by disappointing ''peer reviews''

  16. Role of computers in CANDU safety systems

    International Nuclear Information System (INIS)

    Hepburn, G.A.; Gilbert, R.S.; Ichiyen, N.M.

    1985-01-01

    Small digital computers are playing an expanding role in the safety systems of CANDU nuclear generating stations, both as active components in the trip logic, and as monitoring and testing systems. The paper describes three recent applications: (i) A programmable controller was retro-fitted to Bruce ''A'' Nuclear Generating Station to handle trip setpoint modification as a function of booster rod insertion. (ii) A centralized monitoring computer to monitor both shutdown systems and the Emergency Coolant Injection system, is currently being retro-fitted to Bruce ''A''. (iii) The implementation of process trips on the CANDU 600 design using microcomputers. While not truly a retrofit, this feature was added very late in the design cycle to increase the margin against spurious trips, and has now seen about 4 unit-years of service at three separate sites. Committed future applications of computers in special safety systems are also described. (author)

  17. Economic dynamics with financial fragility and mean-field interaction: A model

    Science.gov (United States)

    Di Guilmi, C.; Gallegati, M.; Landini, S.

    2008-06-01

    Following Aoki’s statistical mechanics methodology [Masanao Aoki, New Approaches to Macroeconomic Modeling, Cambridge University Press, 1996; Masanao Aoki, Modeling Aggregate Behaviour and Fluctuations in Economics, Cambridge University Press, 2002; Masanao Aoki, and Hiroshi Yoshikawa, Reconstructing Macroeconomics, Cambridge University Press, 2006], we provide some insights into the well-known works of [Bruce Greenwald, Joseph Stiglitz, Macroeconomic models with equity and credit rationing, in: R. Hubbard (Ed.), Information, Capital Markets and Investment, Chicago University Press, Chicago, 1990; Bruce Greenwald, Joseph Stiglitz, Financial markets imperfections and business cycles, Quarterly journal of Economics (1993)]. Specifically, we reach analytically a closed form solution of their models overcoming the aggregation problem. The key idea is to represent the economy as an evolving complex system, composed by heterogeneous interacting agents, that can be partitioned into a space of macroscopic states. This meso level of aggregation permits to adopt mean-field interaction modeling and master equation techniques.

  18. APF-The Lick Observatory Automated Planet Finder

    Science.gov (United States)

    2014-04-01

    WILLIAM DEICH,1 BRIAN DUPRAW,1 WAYNE EARTHMAN,1 HARLAND EPPS,1 SANDRA FABER,1 DEBRA FISCHER ,3 ELINOR GATES,1 DAVID HILYARD,1 BRAD HOLDEN,1 KEN JOHNSTON,4...SANDY KEISER,2 DICK KANTO,1 MYRA KATSUKI,1 LEE LAITERMAN,1 KYLE LANCLOS,1 GREG LAUGHLIN,1 JEFF LEWIS,1 CHRIS LOCKWOOD,1,5 PAUL LYNAM,1 GEOFFREY MARCY,6...with S. Vogt as principal investigator, G. Marcy and D. Fischer as coinvestgators, and M. Radovan as project manager and principal engineer. A large

  19. Resources for Childbirth Educators and Expectant Parents

    OpenAIRE

    Shilling, Teri

    2006-01-01

    In this column, reviewers offer perspectives and comments on Hit the Ground Crawling: The Essential Guide for New Fathers, a book by Greg Bishop; The Simple Guide to Having a Baby, a book by Janet Whalley, Penny Simkin, and Ann Keppler; Preparing for Multiples—The Family Way, a book by Cindy Carter, with Jeanne Green and Debby Amis; Hospital to Home: A Security Blanket for New Parents, a DVD released by Injoy Videos; When Survivors Give Birth: Understanding and Healing the Effects of Early Se...

  20. Book Reviews

    Directory of Open Access Journals (Sweden)

    Redactie KITLV

    2002-04-01

    Full Text Available -Greg Bankoff, Alfred W. McCoy, Lives at the margin; Biography of Filipinos obscure, ordinary and heroic. Madison, Wisconsin: Center for Southeast Asian Studies, University of Wisconsin-Madion, v + 481 pp. -Greg Bankoff, Clive J. Christie, Ideology and revolution in Southeast Asia 1900-1980; Political ideas of the anti-colonial era. Richmond, Surrey: Curzon Press, xi + 236 pp. -René van den Berg, Videa P. de Guzman ,Grammatical analysis; Morphology, syntax, and semantics; Studies in honor of Stanley Starosta. Honolulu: University of Hawai'i Press, xv + 298 pp. [Oceanic Linguistics Special Publication 29.], Byron W. Bender (eds -Wayne A. Bougas, Daniel Perret ,Batu Aceh; Warisan sejarah Johor. Kuala Lumpour: École francaise d'Extrême Orient, Johor Baru: Yayasan Warisan Johor, xxxviii + 510 pp., Kamarudin Ab. Razak (eds -Freek Colombijn, Benedict R. O.G. Anderson, Violence and the state in Suharto's Indonesia. Ithaca, New York: Cornell University, Southeast Asia Program, 247 pp. [Studies on Southeast Asia 30.] -Harold Crouch, Stefan Eklöf, Indonesian politics in crisis; The long fall of Suharto, 1996-98. Copenhagen: Nodic Institute of Asian Studies, 1999, xi + 272 pp. [NIAS Studies in Contemporary Asia 1.] -John Gullick, Kumar Ramakrishna, Emergency propaganda; The winning of Malayan hearts and minds 1948-1958. Richmond, Surrey: Curzon, 2002, xii + 306 pp. -Han Bing Siong, Daniel S. Lev, Legal evolution and political authority in Indonesia; Selected essays. The Hague: Kluwer Law International, 2000, 349 pp., The Hague, London, Boston: Kluwer International. -David Henley, Laura Lee Junker, Raiding, trading, and feasting; The political economy of Philippine chiefdoms. Honolulu: University of Hawai'i Press, 1999, ix + 477 pp. -R.D. Hill, Jonathan Rigg, Southeast Asia; The human landscape of modernization and development. London: Routledge, 1997, xxv + 326 pp. -Adrian Horridge, Gene Ammarell, Bugis navigation. New Haven, Connecticut: Yale

  1. Southern Forests: a Journal of Forest Science - Vol 198 (2003)

    African Journals Online (AJOL)

    Reverting urban exotic pine forests to Macchia and indigenous forest vegetation, using cable-yarders on the slopes of Table Mountain, South Africa: management paper · EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. Pierre Ackerman, Bruce Talbot, 35-44 ...

  2. The Brooks Act, Is it Relevant Today?

    Science.gov (United States)

    1994-06-01

    Publishing Company, 1990. 7. Fla=., Kenneth. Creatina The ComDuter. Washington, D.C.: The Brookings Institution, 1988. 8. Gilchrist, Bruce, & Wessel...Milton R. Reaulation of the Computer Industry. Montvale: AFIPS Press, 1972. 9. Gore, Al. Creatina A Government That Works Better & Cost Less: Renort

  3. Corruption, Politics and Societal values in Tanzania: An evaluation ...

    African Journals Online (AJOL)

    Corruption, Politics and Societal values in Tanzania: An evaluation of the Mkapa administration's anti corruption efforts. Bruce Heilman, Lawrean Ndumbaro. Abstract. (Af. J. Political Science: 2001 7(1): 1-20). Full Text: EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT.

  4. 40 Years of the Salmonella Mutagenicity Assay: Implications for 21st Century Toxicology

    Science.gov (United States)

    The Salmonella (Ames) mutagenicity assay was developed and introduced by Bruce Ames and colleagues in 1971. Since then, it has become the standard assay for hazard identification of mutagens worldwide. It is a first-tier test for mutagenic activity in the pharmaceutical and chemi...

  5. STS-41 crew is briefed on camera equipment during training session at JSC

    Science.gov (United States)

    1990-01-01

    STS-41 crewmembers are briefed on camera equipment during training session at JSC. Trainer Judy M. Alexander explains the use 16mm motion picture equipment to (left to right) Pilot Robert D. Cabana, Mission Specialist (MS) Bruce E. Melnick, and MS Thomas D. Akers.

  6. Detection and Identification of Archaeological Sites and Features Using Synthetic Aperture Radar (SAR) Data Collected from Airborne Platforms

    Science.gov (United States)

    2006-04-26

    Director, SERDP Dr. Robert Holst, Program Manager, SERDP Katharine Kerr, SERDP Support Office (HydroGeoLogic, Inc.) Mahta Moghaddam, Associate...JPL/NASA team supervised by Ronald Blom, and composed of Elaine Chapin, Mahta Moghaddam, and Bruce Chapman. The 2002-2005 research described in this

  7. 75 FR 6056 - Establishment of the Wildlife and Hunting Heritage Conservation Council

    Science.gov (United States)

    2010-02-05

    ...; (d) Stimulating sportsmen and women's participation in conservation and management of wildlife and... Council members. DATES: Written nominations must be received by March 8, 2010. ADDRESSES: Send nominations to: Bruce Decker, Chief, Division of Program and Partnership Support, External Affairs, U.S. Fish and...

  8. Law and Power in the Middle Ages

    DEFF Research Database (Denmark)

    International konferenceantologi med bidrag fra Gerd Althoff, Dominique Bauer, Bruce C Brasington, Charlotte Christensen-Nugues, Michael H Gelting, John Gillingham, Eldbjørg Haug, John Hudson, Brigitte Meijns, Hans Jacob Orning, Anne Irene Riisøy, Matthew Strickland, Jo Rune Ugulen, og Sally N Va...

  9. Performance of the Self Referencing Interferometer in the Presence of Simulated Deep Turbulence and Noise Effects

    Science.gov (United States)

    2013-12-01

    This is the second order Zernike polynomial term. Otherwise, the reconstruction is qualitatively sound. 28 2. Branch Points Figure 15...easily be extended for 3D phase unwrapping. % % Posted by Bruce Spottiswoode on 22 December 2008 43 % % 2010/07/23 Modified by Carey Smith

  10. 76 FR 65411 - Specialty Crops; Import Regulations; Proposed Pistachio Import Requirements

    Science.gov (United States)

    2011-10-21

    ..., or E-mail: [email protected] or [email protected] . Small businesses may request... the proposed regulations, ``pistachio'' would mean the nut of the pistachio tree, Pistachia vera.... Pages 326-359. \\5\\ Eaton, David L.; Jennifer E. Hobden; and Bruce J. Kelman. 2002. Aflatoxin in...

  11. Do legitimate polities have fewer homicides? A cross-national analysis

    NARCIS (Netherlands)

    Nivette, Amy E.; Eisner, Manuel

    This research is concerned with developing and testing models of political legitimacy as a predictor of homicide on the cross-national level. Specifically, we used Bruce Gilley’s (2006) theoretically driven indicator of political legitimacy to examine its direct and moderating effects on homicide.

  12. Urihi A: A Terra-Floresta Yanomami

    Directory of Open Access Journals (Sweden)

    James R. Welch

    2010-08-01

    Full Text Available Review of Urihi A: A Terra-Floresta Yanomami. Bruce Albert and William Milliken with Gale Goodwin Gomez. São Paulo: Instituto Socioambiental, 2009. 207 pp., illustrations, tables, bibliography, appendices, index. Paperback ISBN: 978‐85 85994‐72‐3.

  13. Machine Intelligence, a Foreword: The Brain as Electronic Circuitry; Electronic Circuitry as a Brain

    Science.gov (United States)

    1992-06-01

    Precribed byv ANSi Sto Z39-!8 296-.102 TABLE OF CONTENTS THE BOTTO M LINE ............................................................. I BACKG RO UN D...DIRECTOR US ARMY BALLISTIC RESEARCH LABORATORY ATTN: SLCBR-IB-M (DR. BRUCE BURNS ) 1 ABERDEEN PROVING GROUND, MD 21005-5066 NOTE: PLEASE NOTIFY COMMANDER

  14. Cloud and virtual data storage networking

    CERN Document Server

    Schulz, Greg

    2011-01-01

    The amount of data being generated, processed, and stored has reached unprecedented levels. Even during the recent economic crisis, there has been no slow down or information recession. Instead, the need to process, move, and store data has only increased. Consequently, IT organizations are looking to do more with what they have while supporting growth along with new services without compromising on cost and service delivery. Cloud and Virtual Data Storage Networking, by savvy IT industry veteran Greg Schulz, looks at converging IT resources and management technologies for facilitating efficie

  15. Arachis pintoi COMO COBERTURA DE SUELO EN CULTIVOS DE PLÁTANO MACHO (Musa AAB) EN CÁRDENAS, TABASCO, MÉXICO

    OpenAIRE

    Eder Ramos Hernández; Ángel Sol Sánchez; Armando Guerrero Peña; José J. Obrador Olán

    2011-01-01

    El experimento se realizó en Cárdenas, Tabasco enuna plantación de plátano macho, en un suelo con texturafranca, pH moderadamente ácido, contenido de materiaorgánica y nitrógeno total bajo; con la finalidad de evaluar larepuesta al establecimiento de Arachis pintoi Krap. y Greg.como una cobertura viva. El diseño experimental fue bloquescompletos al azar con tres replicas. Se evaluaron tresporcentajes de sombra producida por el cultivo de plátanomacho (21, 45 y 50 %). El establecimiento de A. ...

  16. Seletividade de inseticidas recomendados para a cultura do algodão ao parasitóide de pupas Palmistichus elaeisis (Hymenoptera: Eulophidae)

    OpenAIRE

    Barbosa, Wagner Faria

    2010-01-01

    Insetos pragas podem reduzir a produção do algodoeiro e o controle biológico pode reduzir o uso excessivo de inseticidas nessa cultura. O endoparasitóide gregário de pupas de lepidópteros e coleópteros Palmistichus elaeisis Delvare & LaSalle (Hymenoptera: Eulophidae), por ter hábito generalista e facilidade de criação em hospedeiro alternativo, pode ser utilizado no controle biológico de pragas do algodoeiro. O objetivo dessa pesquisa foi estudar o impacto dos inseticidas acefato, cartape, cl...

  17. Investigation of Sylvatic Typhus at a Wilderness Camp

    Centers for Disease Control (CDC) Podcasts

    In this podcast, Dr. Greg Dasch discusses an outbreak of four cases of sylvatic typhus that occurred at a wilderness camp in Pennsylvania. Sylvatic typhus is very rare in the United States, with only 41 cases since it was discovered in the United States in 1975. Lab work at CDC and the discovery that all four camp counselors who became ill had slept in the same bunk at the camp between 2004 and 2006 ultimately led to confirmation that flying squirrels living in the wall of the cabin were to blame for the illnesses.

  18. Designing Search UX Strategies for eCommerce Success

    CERN Document Server

    Nudelman, Greg

    2011-01-01

    Best practices, practical advice, and design ideas for successful ecommerce search A glaring gap has existed in the market for a resource that offers a comprehensive, actionable design patterns and design strategies for ecommerce search-but no longer. With this invaluable book, user experience designer and user researcher Greg Nudelman shares his years of experience working on popular ecommerce sites as he tackles even the most difficult ecommerce search design problems. Nudelman helps you create highly effective and intuitive ecommerce search design solutions and he takes a unique forward-thi

  19. Excel 2013 all-in-one for dummies

    CERN Document Server

    Harvey, Greg

    2013-01-01

    The comprehensive reference, now completely up-to-date for Excel 2013! As the standard for spreadsheet applications, Excel is used worldwide - but it's not always user-friendly. However, in the hands of veteran bestselling author Greg Harvey, Excel gets a whole lot easier to understand! This handy all-in-one guide covers all the essentials, the new features, how to analyze data with Excel, and much more. The featured minibooks address Excel basics, worksheet design, formulas and functions, worksheet collaboration and review, charts and graphics, data management, data analysis, and

  20. The green and virtual data center

    CERN Document Server

    Schulz, Greg

    2009-01-01

    The Green and Virtual Data Center sets aside the political aspects of what is or is not considered green to instead focus on the opportunities for organizations that want to sustain environmentally-friendly economical growth. If you are willing to believe that IT infrastructure resources deployed in a highly virtualized manner can be combined with other technologies to achieve simplified and cost-effective delivery of services in a  green, profitable manner, this book is for you. Savvy industry veteran Greg Schulz provides real-world insight, addressing best practices, server, software, storag

  1. Functions with non-isolated singularities on singular spaces

    NARCIS (Netherlands)

    Jiang, Guangfeng

    1998-01-01

    Dit proefschrift is een studie van functies op complexe singuliere ruimten met waarden in C . In het bijzonder behandelt het functies met niet-ge?soleerde singulariteiten. Het bouwt enerzijds voort op het werk van Dimca, Bruce- Roberts, Wall en Tibar over functies met ge?soleerde singulariteiten

  2. Mercury: Exploration of a Planet

    Science.gov (United States)

    1976-01-01

    The flight of the Mariner 10 spacecraft to Venus and Mercury is detailed in animation and photography. Views of Mercury are featured. Also included is animation on the origin of the solar system. Dr. Bruce C. Murray, director of the Jet Propulsion Laboratory, comments on the mission.

  3. Intellectual Property Policies at Canadian Universities

    OpenAIRE

    Hen, M.

    2010-01-01

    The present study examines the Intellectual Property policies at schools selected from Research Infosource’s Canada’s Top 50 research universities 2009 (http://www.researchinfosource.com/). This work is a continuation and extension of Dr. Bruce P. Clayman’s original idea and piece University intellectual property policies.

  4. A Multidisciplinary Approach to Study the Role of the Gut Microbiome in Relapsing and Progressive MS

    Science.gov (United States)

    2017-10-01

    PRINCIPAL INVESTIGATOR: Bruce C.A. Cree CONTRACTING ORGANIZATION: UNIVERSITY OF CALIFORNIA, SAN FRANCISCO San Francisco, CA 94158 REPORT DATE: October...SUPPLEMENTARY NOTES 14. ABSTRACT The project is both scientifically and financially on track. In the last year we have concentrated in recruiting...6 5. CHANGES/ PROBLEMS

  5. Valuation Studies 4(1) 2016

    DEFF Research Database (Denmark)

    2016-01-01

    This issue of Valuation Studies presents an anthropological take on 'alternative valuations'. The three articles in this issue stem from a workshop held in August 2012 at James Cook University in Cairns, Australia. The workshop was organized by the guest editors of this issue along with Bruce...

  6. Novel Functional Extended Solids at Extreme Conditions

    Science.gov (United States)

    2013-02-01

    15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT 18. NUMBER OF PAGES 19a. NAME OF RESPONSIBLE PERSON a...ray Evidences J. Chem. Phys. 134, 044519 (2011). 19. Magnus J. Lipp, Jae-Hyun Klepeis, Bruce Baer, Hyunchae Cynn, William J. Evans, Valentin Iota

  7. Ghana Journal of Development Studies - Vol 14, No 1 (2017)

    African Journals Online (AJOL)

    Ghanaian Consumers' Attitudes toward Cisgenic Rice: Are all Genetically Modified Rice the Same? EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. Francis Tsiboe, Lawton L. Nalley, Bruce L. Dixon, Diana Danforth, Anne-Cécile Delwaide, Rodolfo M. Nayga, 1-18.

  8. Ferroelectric Thin Films III, Symposium Held in San Francisco, California on April 13 - 16, 1993. Materials Research Society Symposium Proceedings, Volume 310

    Science.gov (United States)

    1993-04-16

    Publication Data Ferroelectric thin films III : symposium held April 13-16, 1993, San Francisco,California, U.S.A. / editors, Bruce A. Turtle , Edwlrd R...All solutions were placed in a modified Collison Nebulizer which generated the droplets in an oxygen carrier gas. The droplets were transported into

  9. Jazz som transnational populærkultur

    DEFF Research Database (Denmark)

    Mortensen, Tore; Knudsen, Knud

    2013-01-01

    Jazz as Transnational Popular Culture. The Perspective of a Local Biotope In the article, we explore the "diaspora of jazz", inspired by Bruce Johnson's critique of traditional historiography of jazz, portraying it solely as a history of the musical development of jazz. The argument is that jazz...

  10. 78 FR 35066 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Science.gov (United States)

    2013-06-11

    ... intervention should be permitted with particular reference to the following general requirements: (1) The name..., such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC... consideration. Attorney for licensee: Bruce R. Masters, DTE Energy, General Council--Regulatory, 688 WCB, One...

  11. A new species of palaemonid shrimp, Chacella tricornuta spec. nov (Crustacea: Decapoda: Palaemonidae) from the southeastern Gulf of California, Mexico

    NARCIS (Netherlands)

    Hendrickx, M.E.

    1990-01-01

    A new species of the palaemonid shrimp genus Chacella Bruce is described from the Gulf of California, Mexico, in the eastern Pacific, and represents the second known species of this genus. The type-species, Chacella kerstitchi (Wicksten, 1983), was described from a single female captured off the

  12. The Role of Simulation in Test and Evaluation

    Science.gov (United States)

    2010-01-01

    manual N MUM platform (handshake) checklist N Operational test agency milestone C assessment report input N Recorded mission vignettes (LUT training re...Journal Acknowledgments AB3 FDT&E test team (Figure 5): MAJ Cornelius L. Allen, Jr. (test officer), Dr. Bruce Wardlow (analyst), LTC Brian Apgar

  13. The Use of Spider Webs as Passive Bioaerosol Collectors

    Science.gov (United States)

    2009-03-01

    Arachnology , 2001: 82-94. 19. Hindson, Benjamin J., Anthony J. Makarewicz, Ujwal S. Seltur, Bruce D. Henderer, Mary T. McBride, and John M. Dzentis...34 The Journal of Arachnology , 2002: 10- 19. 38. O’Toole, Tara. Hearing on Terrorism Preparedness: Medical First Response. Congressional Hearing

  14. 75 FR 10017 - Submission for OMB Review; Comment Request

    Science.gov (United States)

    2010-03-04

    ... before April 5, 2010 to be assured of consideration. Bureau of Public Debt (BPD) OMB Number: 1535-0120..., change information on account, and transfer ownership. Respondents: Individuals or Households. Estimated Total Burden Hours: 50 hours. Clearance Officer: Bruce Sharpe (304) 480-8150. Bureau of the Public Debt...

  15. Repetition priming of face recognition in a serial choice reaction-time task.

    Science.gov (United States)

    Roberts, T; Bruce, V

    1989-05-01

    Marshall & Walker (1987) found that pictorial stimuli yield visual priming that is disrupted by an unpredictable visual event in the response-stimulus interval. They argue that visual stimuli are represented in memory in the form of distinct visual and object codes. Bruce & Young (1986) propose similar pictorial, structural and semantic codes which mediate the recognition of faces, yet repetition priming results obtained with faces as stimuli (Bruce & Valentine, 1985), and with objects (Warren & Morton, 1982) are quite different from those of Marshall & Walker (1987), in the sense that recognition is facilitated by pictures presented 20 minutes earlier. The experiment reported here used different views of familiar and unfamiliar faces as stimuli in a serial choice reaction-time task and found that, with identical pictures, repetition priming survives and intervening item requiring a response, with both familiar and unfamiliar faces. Furthermore, with familiar faces such priming was present even when the view of the prime was different from the target. The theoretical implications of these results are discussed.

  16. Distribution of the active liquid waste discharge concentration

    International Nuclear Information System (INIS)

    Chan, A.H.C.

    1985-03-01

    In assessing the proposal for removing the on-line liquid effluent monitor (LEM) from the Darlington NGS-A design, it was required to estimate the probability that the concentration of β-y emitters in the active liquid waste (ALW) tank discharges exceeds a specified level. To achieve this, it was necessary to know the underlying distribution of the ALW discharge concentration. Since the distribution could only be estimated from the historical data, it was also important to provide the confidence interval for the estimated probability. Using the ALW discharge records of Pickering and Bruce NGS-A, it was found that the log-normal distribution provided the best fit for the data. The frequency of the tank concentration exceeding the specified level of 24000μCi/m 3 was estimated to be 1 in 200,000 years at Bruce NGS-A and 1 in 100,000 years at Pickering. The 99% upper confidence limits are 1 in 2777 years and 1 in 77 years, respectively

  17. Probabilistic consequence assessment of hydrogen sulphide releases from a heavy water plant

    International Nuclear Information System (INIS)

    Baynes, C.J.

    1986-05-01

    This report provides a summary of work carried out on behalf of the Atomic Energy Control Board, concerned with the consequences of accidental releases to the atmosphere of hydrogen sulphide (H 2 S) at a heavy water plant. In this study, assessments of consequences are made in terms of the probabilities of a range of possible outcomes, i.e., numbers of fatalities, given a certain release scenario. The report describes the major features of a computer model which was developed to calculate the consequences and their associated probabilities, and the major input data used in applying the model to a consequence assessment of the Bruce heavy water plant (HWP) in Ontario. The results of the sensitivity analyses of the model are summarized. Finally, the results of the consequence assessments of 43 accidental release scenarios at the Bruce HWP are summarized, together with a number of conclusions which were drawn from these results regarding the predicted consequences and the factors which influence them

  18. Peer evaluation and some valuable lessons

    Energy Technology Data Exchange (ETDEWEB)

    Holt, A G [Ontario Hydro, Toronto, ON (Canada)

    1991-04-01

    In the mid 1980s there were some signs that Ontario Hydro's nuclear program performance was deteriorating. Such signs included increased maintenance backlog, increased number of jumpers, decreased capacity factors and increasing regulatory concerns. Factors influencing this deterioration were: (a) Pressure tube creep and hydriding rates were excessive leading to increased reactor maintenance and early pressure tube replacement in Pickering NGS-A and Bruce NGS-A. (b) Preventive maintenance was reduced to a minimum owing to manpower and budget restraints. This led to more forced outages, deratings and breakdown maintenance as the urgent was dealt with rather than the important. (c) New systems were installed in the older units, Pickering NGS-A and Bruce NGS-A, in order to backfit safety related system improvements principally to meet increased regulatory requirements. This put additional strain on tight resources to assist with the installation, commissioning, testing and maintenance of these systems that generally increased the complexity of units. Again this led to a reduction of preventive maintenance.

  19. Conference: Seeing two black holes merge (with gravitational waves!) | 14 September | Uni Dufour

    CERN Multimedia

    2016-01-01

    GW150914: the first direct observation of gravitational waves from the inspiral and merger of two black holes - Conference by Prof. Bruce Allen, Albert Einstein Institute Hannover.   "Seeing two black holes merge (with gravitational waves!)" Uni Dufour - Auditorium U300 Wednesday, 14 September at 7 p.m.   Bruce Allen. (Photo: ©F. Vinken/MPG) Abstract: On 14 September 2015, the advanced LIGO gravitational wave instruments detected the gravitational wave signal emitted as two black holes, about one billion light years away from Earth, made a final few orbits around each other then merged together. This was big news around the world, because scientists have tried to make such observations for more than half a century. Before they merged, the two black holes were about 29 and 36 times as massive as the sun; after the merger was complete, a single black hole about 62 times the sun's mass was left behind. I'll describe what black holes are, how they (...

  20. Peer evaluation and some valuable lessons

    International Nuclear Information System (INIS)

    Holt, A.G.

    1991-01-01

    In the mid 1980s there were some signs that Ontario Hydro's nuclear program performance was deteriorating. Such signs included increased maintenance backlog, increased number of jumpers, decreased capacity factors and increasing regulatory concerns. Factors influencing this deterioration were: (a) Pressure tube creep and hydriding rates were excessive leading to increased reactor maintenance and early pressure tube replacement in Pickering NGS-A and Bruce NGS-A. (b) Preventive maintenance was reduced to a minimum owing to manpower and budget restraints. This led to more forced outages, deratings and breakdown maintenance as the urgent was dealt with rather than the important. (c) New systems were installed in the older units, Pickering NGS-A and Bruce NGS-A, in order to backfit safety related system improvements principally to meet increased regulatory requirements. This put additional strain on tight resources to assist with the installation, commissioning, testing and maintenance of these systems that generally increased the complexity of units. Again this led to a reduction of preventive maintenance