WorldWideScience

Sample records for greater schedule control

  1. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  2. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  3. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  4. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  5. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  6. Gain scheduling controller for pitch control of a TRMS system

    Science.gov (United States)

    Bhagyalakshmi, R.; Rashmi, GP; Jaganatha Pandian, B.

    2017-11-01

    Gain scheduling is a control technique which is applied for the control of non-linear systems by using a family of linear controllers at different operating points so as to increase the range of operation of the process. The dynamics of any nonlinear system changes with respect to operating points. These operating points are characterized by one or more variables known as scheduling variables. In such cases, we linearize the system at different equilibrium points. Due to the high amount of non-linearities and complexity in the aerodynamic design, modelling of other unmanned aerial vehicles have been replaced here with twin rotor system. The linearized system is then controlled by using PID controllers which are designed with respect to the obtained operating points. Linearizing of the non-linear system, designing and tuning of PID are being implemented using different MATLAB functions.

  7. Bumpless Transfer between Observer-based Gain Scheduled Controllers

    DEFF Research Database (Denmark)

    Bendtsen, Jan Dimon; Stoustrup, Jakob; Trangbæk, Klaus

    2005-01-01

    This paper deals with bumpless transfer between a number of observer-based controllers in a gain scheduling architecture. Linear observer-based controllers are designed for a number of linear approximations of a nonlinear system in a set of operating points, and gain scheduling control can...

  8. Higher motivation - greater control? The effect of arousal on judgement.

    Science.gov (United States)

    Riemer, Hila; Viswanathan, Madhu

    2013-01-01

    This research examines control over the effect of arousal, a dimension of affect, on judgement. Past research shows that high processing motivation enhances control over the effects of affect on judgement. Isolating and studying arousal as opposed to valence, the other dimension of affect, and its effect on judgement, we identify boundary conditions for past findings. Drawing from the literature on processes by which arousal influences judgement, we demonstrate that the role of motivation is contingent upon the type of judgement task (i.e., memory- versus stimulus-based judgement). In stimulus-based judgement, individuals exert greater control over the effect of arousal on judgement under low compared to high motivation. In contrast, in memory-based judgement individuals exert greater control over the effect of arousal under high compared to low motivation. Theoretical implications and avenues for future research are discussed.

  9. Adaptive Gain Scheduled Semiactive Vibration Control Using a Neural Network

    Directory of Open Access Journals (Sweden)

    Kazuhiko Hiramoto

    2018-01-01

    Full Text Available We propose an adaptive gain scheduled semiactive control method using an artificial neural network for structural systems subject to earthquake disturbance. In order to design a semiactive control system with high control performance against earthquakes with different time and/or frequency properties, multiple semiactive control laws with high performance for each of multiple earthquake disturbances are scheduled with an adaptive manner. Each semiactive control law to be scheduled is designed based on the output emulation approach that has been proposed by the authors. As the adaptive gain scheduling mechanism, we introduce an artificial neural network (ANN. Input signals of the ANN are the measured earthquake disturbance itself, for example, the acceleration, velocity, and displacement. The output of the ANN is the parameter for the scheduling of multiple semiactive control laws each of which has been optimized for a single disturbance. Parameters such as weight and bias in the ANN are optimized by the genetic algorithm (GA. The proposed design method is applied to semiactive control design of a base-isolated building with a semiactive damper. With simulation study, the proposed adaptive gain scheduling method realizes control performance exceeding single semiactive control optimizing the average of the control performance subject to various earthquake disturbances.

  10. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  11. Schedulability analysis for systems with data and control dependencies

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2000-01-01

    Is this paper we present an approach to schedulability analysis for hard real-time systems with control and data dependencies. We consider distributed architectures consisting of multiple programmable processors, and the scheduling policy is based on a static priority preemptive strategy! Our model...... of the system captures bath data and control dependencies, and the schedulability approach is able to reduce the pessimism of the analysis by using the knowledge about control ann data dependencies. Extensive experiments as well as a real life example demonstrate the efficiency of our approach....

  12. Schedules of controlled substances: temporary placement of three synthetic cannabinoids into Schedule I. Final order.

    Science.gov (United States)

    2013-05-16

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule three synthetic cannabinoids under the Controlled Substances Act (CSA) pursuant to the temporary scheduling provisions of 21 U.S.C. 811(h). The substances are (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48). This action is based on a finding by the Deputy Administrator that the placement of these synthetic cannabinoids and their salts, isomers and salts of isomers into Schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the full effect of the CSA and the Controlled Substances Import and Export Act (CSIEA) and their implementing regulations including criminal, civil and administrative penalties, sanctions and regulatory controls of Schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic cannabinoids.

  13. Combined Noncyclic Scheduling and Advanced Control for Continuous Chemical Processes

    Directory of Open Access Journals (Sweden)

    Damon Petersen

    2017-12-01

    Full Text Available A novel formulation for combined scheduling and control of multi-product, continuous chemical processes is introduced in which nonlinear model predictive control (NMPC and noncyclic continuous-time scheduling are efficiently combined. A decomposition into nonlinear programming (NLP dynamic optimization problems and mixed-integer linear programming (MILP problems, without iterative alternation, allows for computationally light solution. An iterative method is introduced to determine the number of production slots for a noncyclic schedule during a prediction horizon. A filter method is introduced to reduce the number of MILP problems required. The formulation’s closed-loop performance with both process disturbances and updated market conditions is demonstrated through multiple scenarios on a benchmark continuously stirred tank reactor (CSTR application with fluctuations in market demand and price for multiple products. Economic performance surpasses cyclic scheduling in all scenarios presented. Computational performance is sufficiently light to enable online operation in a dual-loop feedback structure.

  14. Gain Scheduling Control based on Closed-Loop System Identification

    DEFF Research Database (Denmark)

    Bendtsen, Jan Dimon; Trangbæk, Klaus

    the first and a second operating point is identified in closed-loop using system identification methods with open-loop properties. Next, a linear controller is designed for this linearised model, and gain scheduling control can subsequently be achieved by interpolating between each controller...

  15. Gain Scheduling of Observer-Based Controllers with Integral Action

    DEFF Research Database (Denmark)

    Trangbæk, Klaus; Stoustrup, Jakob; Bendtsen, Jan Dimon

    2006-01-01

     This paper presents a method for continuous gain scheduling of  observer-based controllers with integral action. Given two stabilising controllers for a given system, explicit state space formulae are presented, allowing to change gradually from one  controller to the other while preserving...

  16. Gain scheduled linear quadratic control for quadcopter

    Science.gov (United States)

    Okasha, M.; Shah, J.; Fauzi, W.; Hanouf, Z.

    2017-12-01

    This study exploits the dynamics and control of quadcopters using Linear Quadratic Regulator (LQR) control approach. The quadcopter’s mathematical model is derived using the Newton-Euler method. It is a highly manoeuvrable, nonlinear, coupled with six degrees of freedom (DOF) model, which includes aerodynamics and detailed gyroscopic moments that are often ignored in many literatures. The linearized model is obtained and characterized by the heading angle (i.e. yaw angle) of the quadcopter. The adopted control approach utilizes LQR method to track several reference trajectories including circle and helix curves with significant variation in the yaw angle. The controller is modified to overcome difficulties related to the continuous changes in the operating points and eliminate chattering and discontinuity that is observed in the control input signal. Numerical non-linear simulations are performed using MATLAB and Simulink to illustrate to accuracy and effectiveness of the proposed controller.

  17. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  18. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  19. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  20. Impact of Scheduling Policies on Control System Performance

    DEFF Research Database (Denmark)

    Schiøler, Henrik; Ravn, Anders Peter; Nielsen, Jens Frederik Dalsgaard

    2003-01-01

    It is well known that jitter has an impact on control system performance, and this is often used as an argument for static scheduling policies, e.g. a time triggered architecture. However, it is only completion jitter that seriously disturbs standard linear control algorithms in a way similar to ...

  1. Verification and Optimization of a PLC Control Schedule

    NARCIS (Netherlands)

    Brinksma, Hendrik; Mader, Angelika H.; Havelund, K.; Penix, J.; Visser, W.

    We report on the use of the SPIN model checker for both the verification of a process control program and the derivation of optimal control schedules. This work was carried out as part of a case study for the EC VHS project (Verification of Hybrid Systems), in which the program for a Programmable

  2. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Science.gov (United States)

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  3. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Directory of Open Access Journals (Sweden)

    Jinxiang Dong

    2008-07-01

    Full Text Available There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting crosslayer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An eventdriven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN.

  4. Verifiable Task Assignment and Scheduling Controller

    Science.gov (United States)

    2017-07-01

    variables are defined , 5) submit the pattern, 6) repeat steps 1-5 until all patterns are created, 7) submit the completed patterns 28) Satisfaction ...further complexity through decentralized control elements and flexible autonomy, such as autonomy that can be operator- customized for the mission at... custom software method within the model builder converts the flight plans into the format needed by the model checker (i.e., a finite state transition

  5. Neural Feedback Scheduling of Real-Time Control Tasks

    OpenAIRE

    Xia, Feng; Tian, Yu-Chu; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    Many embedded real-time control systems suffer from resource constraints and dynamic workload variations. Although optimal feedback scheduling schemes are in principle capable of maximizing the overall control performance of multitasking control systems, most of them induce excessively large computational overheads associated with the mathematical optimization routines involved and hence are not directly applicable to practical systems. To optimize the overall control performance while minimi...

  6. Controller Area Network (CAN) schedulability analysis : refuted, revisited and revised

    NARCIS (Netherlands)

    Davis, R.I.; Burns, A.; Bril, R.J.; Lukkien, J.J.

    2007-01-01

    Controller Area Network (CAN) is used extensively in automotive applications, with in excess of 400 million CAN enabled microcontrollers manufactured each year. In 1994 schedulability analysis was developed for CAN, showing how worst-case response times of CAN messages could be calculated and hence

  7. Impact of Scheduling Policies on Control System Performance

    DEFF Research Database (Denmark)

    Schiøler, Henrik; Ravn, Anders Peter; Nielsen, Jens Frederik Dalsgaard

    in the deterministic case and under white noise disturbances. The conclusion is that under very reasonable assumptions about robustness of control algorithms,they are insensitive to relase jitter, albeit strongly sensitive to completion jitter, thus priority based scheduling without preemption is may be preferable...

  8. Fuzzy Networked Control Systems Design Considering Scheduling Restrictions

    Directory of Open Access Journals (Sweden)

    H. Benítez-Pérez

    2012-01-01

    known a priory but from a dynamic real-time behavior. To do so, the use of priority dynamic Priority exchange scheduling is performed. The objective of this paper is to show a way to tackle multiple time delays that are bounded and the dynamic response from real-time scheduling approximation. The related control law is designed considering fuzzy logic approximation for nonlinear time delays coupling, where the main advantage is the integration of this behavior through extended state space representation keeping certain linear and bounded behavior and leading to a stable situation during events presentation by guaranteeing stability through Lyapunov.

  9. Design of Gain Scheduling Control Using State Derivative Feedback

    Directory of Open Access Journals (Sweden)

    Lázaro Ismael Hardy Llins

    2017-01-01

    Full Text Available In recent years, the study of systems subject to time-varying parameters has awakened the interest of many researchers. The gain scheduling control strategy guarantees a good performance for systems of this type and also is considered as the simplest to deal with problems of this nature. Moreover, the class of systems in which the state derivative signals are easier to obtain than the state signals, such as in the control for reducing vibrations in a mechanical system, has gained an important hole in control theory. Considering those ideas, we propose sufficient conditions via LMI for designing a gain scheduling controller using state derivative feedback. The D-stability methodology was used for improving the performance of the transitory response. Practical implementation in an active suspension system and comparison with other methods validates the efficiency of the proposed strategy.

  10. Real-time control systems: feedback, scheduling and robustness

    Science.gov (United States)

    Simon, Daniel; Seuret, Alexandre; Sename, Olivier

    2017-08-01

    The efficient control of real-time distributed systems, where continuous components are governed through digital devices and communication networks, needs a careful examination of the constraints arising from the different involved domains inside co-design approaches. Thanks to the robustness of feedback control, both new control methodologies and slackened real-time scheduling schemes are proposed beyond the frontiers between these traditionally separated fields. A methodology to design robust aperiodic controllers is provided, where the sampling interval is considered as a control variable of the system. Promising experimental results are provided to show the feasibility and robustness of the approach.

  11. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  12. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  13. Gain Scheduling for the Orion Launch Abort Vehicle Controller

    Science.gov (United States)

    McNamara, Sara J.; Restrepo, Carolina I.; Madsen, Jennifer M.; Medina, Edgar A.; Proud, Ryan W.; Whitley, Ryan J.

    2011-01-01

    One of NASAs challenges for the Orion vehicle is the control system design for the Launch Abort Vehicle (LAV), which is required to abort safely at any time during the atmospheric ascent portion of ight. The focus of this paper is the gain design and scheduling process for a controller that covers the wide range of vehicle configurations and flight conditions experienced during the full envelope of potential abort trajectories from the pad to exo-atmospheric flight. Several factors are taken into account in the automation process for tuning the gains including the abort effectors, the environmental changes and the autopilot modes. Gain scheduling is accomplished using a linear quadratic regulator (LQR) approach for the decoupled, simplified linear model throughout the operational envelope in time, altitude and Mach number. The derived gains are then implemented into the full linear model for controller requirement validation. Finally, the gains are tested and evaluated in a non-linear simulation using the vehicles ight software to ensure performance requirements are met. An overview of the LAV controller design and a description of the linear plant models are presented. Examples of the most significant challenges with the automation of the gain tuning process are then discussed. In conclusion, the paper will consider the lessons learned through out the process, especially in regards to automation, and examine the usefulness of the gain scheduling tool and process developed as applicable to non-Orion vehicles.

  14. Economic Benefit from Progressive Integration of Scheduling and Control for Continuous Chemical Processes

    Directory of Open Access Journals (Sweden)

    Logan D. R. Beal

    2017-12-01

    Full Text Available Performance of integrated production scheduling and advanced process control with disturbances is summarized and reviewed with four progressive stages of scheduling and control integration and responsiveness to disturbances: open-loop segregated scheduling and control, closed-loop segregated scheduling and control, open-loop scheduling with consideration of process dynamics, and closed-loop integrated scheduling and control responsive to process disturbances and market fluctuations. Progressive economic benefit from dynamic rescheduling and integrating scheduling and control is shown on a continuously stirred tank reactor (CSTR benchmark application in closed-loop simulations over 24 h. A fixed horizon integrated scheduling and control formulation for multi-product, continuous chemical processes is utilized, in which nonlinear model predictive control (NMPC and continuous-time scheduling are combined.

  15. Application of gain scheduling to the control of batch bioreactors

    Science.gov (United States)

    Cardello, Ralph; San, Ka-Yiu

    1987-01-01

    The implementation of control algorithms to batch bioreactors is often complicated by the inherent variations in process dynamics during the course of fermentation. Such a wide operating range may render the performance of fixed gain PID controllers unsatisfactory. In this work, a detailed study on the control of batch fermentation is performed. Furthermore, a simple batch controller design is proposed which incorporates the concept of gain-scheduling, a subclass of adaptive control, with oxygen uptake rate as an auxiliary variable. The control of oxygen tension in the biorector is used as a vehicle to convey the proposed idea, analysis and results. Simulation experiments indicate significant improvement in controller performance can be achieved by the proposed approach even in the presence of measurement noise.

  16. Integrated project scheduling and staff assignment with controllable processing times.

    Science.gov (United States)

    Fernandez-Viagas, Victor; Framinan, Jose M

    2014-01-01

    This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  17. Integrated Project Scheduling and Staff Assignment with Controllable Processing Times

    Directory of Open Access Journals (Sweden)

    Victor Fernandez-Viagas

    2014-01-01

    Full Text Available This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  18. Diversity Controlling Genetic Algorithm for Order Acceptance and Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Cheng Chen

    2014-01-01

    Full Text Available Selection and scheduling are an important topic in production systems. To tackle the order acceptance and scheduling problem on a single machine with release dates, tardiness penalty, and sequence-dependent setup times, in this paper a diversity controlling genetic algorithm (DCGA is proposed, in which a diversified population is maintained during the whole search process through survival selection considering both the fitness and the diversity of individuals. To measure the similarity between individuals, a modified Hamming distance without considering the unaccepted orders in the chromosome is adopted. The proposed DCGA was validated on 1500 benchmark instances with up to 100 orders. Compared with the state-of-the-art algorithms, the experimental results show that DCGA improves the solution quality obtained significantly, in terms of the deviation from upper bound.

  19. College students who have an eveningness preference report lower self-control and greater procrastination.

    Science.gov (United States)

    Digdon, Nancy L; Howell, Andrew J

    2008-11-01

    Previous research suggests a possible link between eveningness and general difficulties with self-regulation (e.g., evening types are more likely than other chronotypes to have irregular sleep schedules and social rhythms and use substances). Our study investigated the relationship between eveningness and self-regulation by using two standardized measures of self-regulation: the Self-Control Scale and the Procrastination Scale. We predicted that an eveningness preference would be associated with poorer self-control and greater procrastination than would an intermediate or morningness preference. Participants were 308 psychology students (mean age=19.92 yrs) at a small Canadian college. Students completed the self-regulation questionnaires and Morningness/Eveningness Questionnaire (MEQ) online. The mean MEQ score was 46.69 (SD=8.20), which is intermediate between morningness and eveningness. MEQ scores ranged from definite morningness to definite eveningness, but the dispersion of scores was skewed toward more eveningness. Pearson and partial correlations (controlling for age) were used to assess the relationship between MEQ score and the Self-Control Scale (global score and 5 subscale scores) and Procrastination Scale (global score). All correlations were significant. The magnitude of the effects was medium for all measures except one of the Self-Control subscales, which was small. A multiple regression analysis to predict MEQ score using the Self-Control Scale (global score), Procrastination Scale, and age as predictors indicated the Self-Control Scale was a significant predictor (accounting for 20% of the variance). A multiple regression analysis to predict MEQ scores using the five subscales of the Self-Control Scale and age as predictors showed the subscales for reliability and work ethic were significant predictors (accounting for 33% of the variance). Our study showed a relationship between eveningness and low self-control, but it did not address whether the

  20. Control and Elimination of Helminth Zoonoses in the Greater ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Addressing the problem before it spreads While health authorities have reduced the overall numbers of cases (mainly through mass drug treatments of at-risk ... Parasite prevention and control This project expands on research from the Ecohealth Emerging Infectious Diseases Initiative, where researchers identified and ...

  1. Humanoid Walking Robot: Modeling, Inverse Dynamics, and Gain Scheduling Control

    Directory of Open Access Journals (Sweden)

    Elvedin Kljuno

    2010-01-01

    Full Text Available This article presents reference-model-based control design for a 10 degree-of-freedom bipedal walking robot, using nonlinear gain scheduling. The main goal is to show concentrated mass models can be used for prediction of the required joint torques for a bipedal walking robot. Relatively complicated architecture, high DOF, and balancing requirements make the control task of these robots difficult. Although linear control techniques can be used to control bipedal robots, nonlinear control is necessary for better performance. The emphasis of this work is to show that the reference model can be a bipedal walking model with concentrated mass at the center of gravity, which removes the problems related to design of a pseudo-inverse system. Another significance of this approach is the reduced calculation requirements due to the simplified procedure of nominal joint torques calculation. Kinematic and dynamic analysis is discussed including results for joint torques and ground force necessary to implement a prescribed walking motion. This analysis is accompanied by a comparison with experimental data. An inverse plant and a tracking error linearization-based controller design approach is described. We propose a novel combination of a nonlinear gain scheduling with a concentrated mass model for the MIMO bipedal robot system.

  2. Automated mixed traffic vehicle control and scheduling study

    Science.gov (United States)

    Peng, T. K. C.; Chon, K.

    1976-01-01

    The operation and the expected performance of a proposed automatic guideway transit system which uses low speed automated mixed traffic vehicles (AMTVs) were analyzed. Vehicle scheduling and headway control policies were evaluated with a transit system simulation model. The effect of mixed traffic interference on the average vehicle speed was examined with a vehicle pedestrian interface model. Control parameters regulating vehicle speed were evaluated for safe stopping and passenger comfort. Some preliminary data on the cost and operation of an experimental AMTV system are included. These data were the result of a separate task conducted at JPL, and were included as background information.

  3. A Gain-Scheduling PI Control Based on Neural Networks

    Directory of Open Access Journals (Sweden)

    Stefania Tronci

    2017-01-01

    Full Text Available This paper presents a gain-scheduling design technique that relies upon neural models to approximate plant behaviour. The controller design is based on generic model control (GMC formalisms and linearization of the neural model of the process. As a result, a PI controller action is obtained, where the gain depends on the state of the system and is adapted instantaneously on-line. The algorithm is tested on a nonisothermal continuous stirred tank reactor (CSTR, considering both single-input single-output (SISO and multi-input multi-output (MIMO control problems. Simulation results show that the proposed controller provides satisfactory performance during set-point changes and disturbance rejection.

  4. Structured, Gain-Scheduled Control of Wind Turbines

    DEFF Research Database (Denmark)

    Adegas, Fabiano Daher

    2013-01-01

    Improvements in cost-effectiveness and reliability of wind turbines is a constant in the industry. This requires new knowledge and systematic methods for analyzing and designing the interaction of structural dynamics, aerodynamics, and controllers. This thesis presents novel methods and theoretical....... Robustness and fault-tolerance capabilities are also important properties, which should be considered in the design process. Novel gain-scheduling and robust control methods that adapt to variations in the operational conditions of the wind turbine are proposed under the linear parameter-varying (LPV...... intuitive and physical specifications for vibration control, such as minimum damping and decay rate of aeroelastic modes. Moreover, the number of weighting functions and consequently the order of the final controller is reduced. Inspired by this application, theoretical control developments are presented...

  5. Scheduling algorithms for automatic control systems for technological processes

    Science.gov (United States)

    Chernigovskiy, A. S.; Tsarev, R. Yu; Kapulin, D. V.

    2017-01-01

    Wide use of automatic process control systems and the usage of high-performance systems containing a number of computers (processors) give opportunities for creation of high-quality and fast production that increases competitiveness of an enterprise. Exact and fast calculations, control computation, and processing of the big data arrays - all of this requires the high level of productivity and, at the same time, minimum time of data handling and result receiving. In order to reach the best time, it is necessary not only to use computing resources optimally, but also to design and develop the software so that time gain will be maximal. For this purpose task (jobs or operations), scheduling techniques for the multi-machine/multiprocessor systems are applied. Some of basic task scheduling methods for the multi-machine process control systems are considered in this paper, their advantages and disadvantages come to light, and also some usage considerations, in case of the software for automatic process control systems developing, are made.

  6. Dynamic Intelligent Feedback Scheduling in Networked Control Systems

    Directory of Open Access Journals (Sweden)

    Hui-ying Chen

    2013-01-01

    Full Text Available For the networked control system with limited bandwidth and flexible workload, a dynamic intelligent feedback scheduling strategy is proposed. Firstly, a monitor is used to acquire the current available network bandwidth. Then, the new available bandwidth in the next interval is predicted by using LS_SVM approach. At the same time, the dynamic performance indices of all control loops are obtained with a two-dimensional fuzzy logic modulator. Finally, the predicted network bandwidth is dynamically allocated by the bandwidth manager and the priority allocator in terms of the loops' dynamic performance indices. Simulation results show that the sampling periods and priorities of control loops are adjusted timely according to the network workload condition and the dynamic performance of control loops, which make the system running in the optimal state all the time.

  7. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  8. Automatic Scheduling and Planning (ASAP) in future ground control systems

    Science.gov (United States)

    Matlin, Sam

    1988-01-01

    This report describes two complementary approaches to the problem of space mission planning and scheduling. The first is an Expert System or Knowledge-Based System for automatically resolving most of the activity conflicts in a candidate plan. The second is an Interactive Graphics Decision Aid to assist the operator in manually resolving the residual conflicts which are beyond the scope of the Expert System. The two system designs are consistent with future ground control station activity requirements, support activity timing constraints, resource limits and activity priority guidelines.

  9. Robust, Gain-Scheduled Control of Wind Turbines

    DEFF Research Database (Denmark)

    Østergaard, Kasper Zinck

    Wind turbines are today large and efficient machines, which are combined into wind farms operating on par with conventional power plants. When looking back, this is significantly different from the status only a few years ago, when wind turbines were sold mainly to private people. This change...... in turbine owners has resulted in a new focus on operational reliability instead of turbine size. This research deals with investigating model-based gain-scheduling control of wind turbines by use of linear parameter varying (LPV) methods. The numerical challenges grow quickly with the model size...

  10. Gain Scheduling Control of an Islanded Microgrid Voltage

    Directory of Open Access Journals (Sweden)

    Haritza Camblong

    2014-07-01

    Full Text Available The aim of this research study has been to design a gain scheduling (GS digital controller in order to control the voltage of an islanded microgrid in the presence of fast varying loads (FVLs, and to compare it to a robust controller. The inverter which feeds the microgrid is connected to it through an inductance-capacitor-inductance (LCL filter. The oscillatory and nonlinear behaviour of the plant is analyzed in the whole operating zone. Afterwards, the design of the controllers which contain two loops in cascade are described. The first loop concerns the current control, while the second is linked to the voltage regulation. Two controllers, one defined as Robust and another one as GS controller, are designed for the two loops, emphasizing in their robustness and their ability to damp the oscillatory plant behaviour. To finish, some simulations are carried out to study and compare the two kinds of controllers in different operating points. The results show that both controllers damp the oscillatory behaviour of the plant in closed loop (CL, and that the GS controller ensures a better rejection of current disturbances from FVLs.

  11. An application of gain-scheduled control using state-space interpolation to hydroactive gas bearings

    DEFF Research Database (Denmark)

    Theisen, Lukas Roy Svane; Camino, Juan F.; Niemann, Hans Henrik

    2016-01-01

    with a gain-scheduling strategy using state-space interpolation, which avoids both the performance loss and the increase of controller order associated to the Youla parametrisation. The proposed state-space interpolation for gain-scheduling is applied for mass imbalance rejection for a controllable gas...... bearing scheduled in two parameters. Comparisons against the Youla-based scheduling demonstrate the superiority of the state-space interpolation....

  12. Effects on employees of controlling working hours and working schedules.

    Science.gov (United States)

    Kubo, T; Takahashi, M; Togo, F; Liu, X; Shimazu, A; Tanaka, K; Takaya, M

    2013-03-01

    High levels of control over working time and low variability in working hours have been associated with improved health-related outcomes. The potential mechanisms for this association remain unclear. To examine how work-time control and variability of working times are associated with fatigue recovery, sleep quality, work-life balance, and 'near misses' at work. Manufacturing sector employees completed a questionnaire that assessed work-time control, work-time variability, fatigue recovery, sleep quality, work-life balance and the frequency of near misses in the past 6 months. Mixed model analysis of covariance and multiple logistic regression analysis tested the main effects of work-time control and variability and their interaction, while adjusting for age, sex, work schedules, and overtime work in the past month. Subscales of work-time control were also investigated (control over daily working hours and over days off). One thousand three hundred and seventy-two completed questionnaires were returned, a response rate of 69%. A significantly higher quality of sleep and better work-life balance were found in the 'high control with low variability' reference group than in the other groups. Significantly better recovery of fatigue was also observed in the group having control over days off with low variability. While near misses were more frequent in the group with high control over daily working hours coupled with high variability compared with the reference group this was not significant. High work-time control and low variability were associated with favourable outcomes of health and work-life balance. This combined effect was not observed for the safety outcome addressed here.

  13. Terminal Control Area Aircraft Scheduling and Trajectory Optimization Approaches

    Directory of Open Access Journals (Sweden)

    Samà Marcella

    2017-01-01

    Full Text Available Aviation authorities are seeking optimization methods to better use the available infrastructure and better manage aircraft movements. This paper deals with the realtime scheduling of take-off and landing aircraft at a busy terminal control area and with the optimization of aircraft trajectories during the landing procedures. The first problem aims to reduce the propagation of delays, while the second problem aims to either minimize the travel time or reduce the fuel consumption. Both problems are particularly complex, since the first one is NP-hard while the second one is nonlinear and a combined solution needs to be computed in a short-time during operations. This paper proposes a framework for the lexicographic optimization of the two problems. Computational experiments are performed for the Milano Malpensa airport and show the existing gaps between the performance indicators of the two problems when different lexicographic optimization approaches are considered.

  14. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  15. LPV gain-scheduled control of SCR aftertreatment systems

    Science.gov (United States)

    Meisami-Azad, Mona; Mohammadpour, Javad; Grigoriadis, Karolos M.; Harold, Michael P.; Franchek, Matthew A.

    2012-01-01

    Hydrocarbons, carbon monoxide and some of other polluting emissions produced by diesel engines are usually lower than those produced by gasoline engines. While great strides have been made in the exhaust aftertreatment of vehicular pollutants, the elimination of nitrogen oxide (NO x ) from diesel vehicles is still a challenge. The primary reason is that diesel combustion is a fuel-lean process, and hence there is significant unreacted oxygen in the exhaust. Selective catalytic reduction (SCR) is a well-developed technology for power plants and has been recently employed for reducing NO x emissions from automotive sources and in particular, heavy-duty diesel engines. In this article, we develop a linear parameter-varying (LPV) feedforward/feedback control design method for the SCR aftertreatment system to decrease NO x emissions while keeping ammonia slippage to a desired low level downstream the catalyst. The performance of the closed-loop system obtained from the interconnection of the SCR system and the output feedback LPV control strategy is then compared with other control design methods including sliding mode, and observer-based static state-feedback parameter-varying control. To reduce the computational complexity involved in the control design process, the number of LPV parameters in the developed quasi-LPV (qLPV) model is reduced by applying the principal component analysis technique. An LPV feedback/feedforward controller is then designed for the qLPV model with reduced number of scheduling parameters. The designed full-order controller is further simplified to a first-order transfer function with a parameter-varying gain and pole. Finally, simulation results using both a low-order model and a high-fidelity and high-order model of SCR reactions in GT-POWER interfaced with MATLAB/SIMULINK illustrate the high NO x conversion efficiency of the closed-loop SCR system using the proposed parameter-varying control law.

  16. Optimal OFDMA Downlink Scheduling Under a Control Signaling Cost Constraint

    OpenAIRE

    Larsson, Erik G.

    2010-01-01

    This paper proposes a new algorithm for downlink scheduling in OFDMA systems. The method maximizes the throughput, taking into account the amount of signaling needed to transmit scheduling maps to the users. A combinatorial problem is formulated and solved via a dynamic programming approach reminiscent of the Viterbi algorithm. The total computational complexity of the algorithm is upper boundedby O(K^4N) where K is the number of users that are being considered for scheduling in a frame and N...

  17. 78 FR 26701 - Schedules of Controlled Substances: Placement of Lorcaserin Into Schedule IV

    Science.gov (United States)

    2013-05-08

    .... Phentermine Being Combined With Lorcaserin Eight commenters expressed concern about the probability that... follows: Several commenters were critical of DEA's handling of the scheduling process. The commenters did..., 1301.74, 1301.75(b) and (c), 1301.76, and 1301.77 on or after June 7, 2013. Labeling and Packaging. All...

  18. 77 FR 12508 - Schedules of Controlled Substances: Placement of Five Synthetic Cannabinoids Into Schedule I

    Science.gov (United States)

    2012-03-01

    ... constituent of marijuana. ``Synthetic cannabinoids'' are a large family of chemically unrelated structures... that is more common in current usage, ``marijuana.'' The emergence of these five synthetic cannabinoids... cannabinoids with a potential for abuse similar to the Schedule I substances marijuana and THC. These synthetic...

  19. 77 FR 75075 - Schedules of Controlled Substances: Placement of Lorcaserin Into Schedule IV

    Science.gov (United States)

    2012-12-19

    ... marketing lorcaserin as a Schedule IV substance will decrease its abuse, as opposed to marketing it as an... for marketing by FDA as an addition to a reduced-calorie diet and exercise, for chronic weight... to Section 3(d)(1) of Executive Order 12866 and the principles reaffirmed in Executive Order 13563...

  20. A Hierarchical Algorithm for Integrated Scheduling and Control With Applications to Power Systems

    DEFF Research Database (Denmark)

    Sokoler, Leo Emil; Dinesen, Peter Juhler; Jørgensen, John Bagterp

    2016-01-01

    The contribution of this paper is a hierarchical algorithm for integrated scheduling and control via model predictive control of hybrid systems. The controlled system is a linear system composed of continuous control, state, and output variables. Binary variables occur as scheduling decisions in ...

  1. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  2. 78 FR 55099 - Established Aggregate Production Quotas for Schedule I and II Controlled Substances and...

    Science.gov (United States)

    2013-09-09

    ... aggregate production quotas, an additional 25% of the estimated medical, scientific, and research needs as... Production Quotas for Schedule I and II Controlled Substances and Established Assessment of Annual Needs for... initial 2014 aggregate production quotas for controlled substances in Schedules I and II of the Controlled...

  3. 40 CFR 798.6500 - Schedule-controlled operant behavior.

    Science.gov (United States)

    2010-07-01

    ..., such as food or water (Ferster and Skinner, 1957 under paragraph (f)(2) of this section). For example....B. Skinner, B.F. Schedules of Reinforcement. (New York: Appleton-Century-Crofts, 1957). (3) Laties...

  4. Schedules of Controlled Substances: Placement of UR-144, XLR11, and AKB48 into Schedule I. Final rule.

    Science.gov (United States)

    2016-05-11

    With the issuance of this final rule, the Drug Enforcement Administration places (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11), and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48), including their salts, isomers, and salts of isomers whenever the existence of such salts, isomers, and salts of isomers is possible, into schedule I of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle UR-144, XLR11, or AKB48.

  5. Mix-oriented manufacturing control (MOMC): a quasi-optimal procedure for dynamic scheduling control

    Science.gov (United States)

    Cristofari, Marco; Caron, Franco; McDuffie, Ernest L.

    1997-12-01

    The total system throughput (ST) is one of the most important decision variables at the planning/scheduling phase of a manufacturing system. Material requirement planning (MRP) and master production schedule (MPS) are based on the assumption that ST is known. All the subsequent developments (e.g. jobs- release, system work-load, input-product mix, etc.) depends on such an assumption. If this assumption is incorrect, the production activity control (PAC) will not be able to satisfy the planned targets during the scheduling phase. Delays and bottlenecks will be unavoidable in the system. In case of random flexible manufacturing system (FMS) (or, in general, job-shop production), the measure of ST can not be evaluated a priori without running simulations or observing the actual flow of the operations in the system. The way entities enter the system (sequencing and percentage of the input products) effects the value of ST in such a way that estimation based on historical data are highly risky. The methodology proposed in this paper allows the scheduler to assess the analytical functions which link ST, and other output performance variables, to the input product mix (IPM). This way the robustness of the scheduling plan can be verified before the actual release of the jobs into the system.

  6. 78 FR 37237 - Proposed Adjustments to the Aggregate Production Quotas for Schedule I and II Controlled...

    Science.gov (United States)

    2013-06-20

    ... class of controlled substance listed in schedules I and II and for ephedrine, pseudoephedrine, and... disposal by the registrants holding individual manufacturing quotas for the class; (2) whether any... the Aggregate Production Quotas for Schedule I and II Controlled Substances and Assessment of Annual...

  7. 75 FR 71635 - Schedules of Controlled Substances: Temporary Placement of Five Synthetic Cannabinoids Into...

    Science.gov (United States)

    2010-11-24

    ... these THC-like synthetic cannabinoids are marketed as ``legal'' alternatives to marijuana and are being...] Schedules of Controlled Substances: Temporary Placement of Five Synthetic Cannabinoids Into Schedule I... intent to temporarily place five synthetic cannabinoids into the Controlled Substances Act (CSA) pursuant...

  8. Is There a Downside to Schedule Control for the Work-Family Interface?

    Science.gov (United States)

    Schieman, Scott; Young, Marisa

    2010-01-01

    Using data from a 2007 U.S. survey of workers, this article examines the implications of schedule control for work-family role blurring and work-family conflict. Four main findings indicate that (a) schedule control is associated with more frequent working at home and work-family multitasking activities; (b) the positive association between…

  9. The Evolution of Cost/Schedule Control (Direct Labor) in Naval Shipyards

    National Research Council Canada - National Science Library

    Gessis, Scott N

    1992-01-01

    The evolution of a Cost/Schedule Control System (C/SCS), for direct labor, in naval shipyards can be traced from the cost/schedule control concept used in the Air Force in the 1960s, as an initiative toward more reliable data...

  10. Gain-Scheduled Control of a Fossil-Fired Power Plant Boiler

    DEFF Research Database (Denmark)

    Hangstrup, M.; Stoustrup, Jakob; Andersen, Palle

    1999-01-01

    -scheduling which interpolates between unstable controllers is not allowed using traditional schemes. The results show that a considerable optimization of the conventional controlled system is obtainable. Also the gain-scheduled optimizing controller is seen to have a superior performance compared to the fixed LTI......In this paper the objective is to optimize the control of a coal fired 250 MW power plant boiler. The conventional control system is supplemented with a multivariable optimizing controller operating in parallel with the conventional control system. Due to the strong dependence of the gains...... and dynamics upon the load, it is beneficial to consider a gain-scheduling control approach. Optimization using complex mu synthesis results in unstable LTI controllers in some operating points of the boiler. A recent gain-scheduling approach allowing for unstable fixed LTI controllers is applied. Gain...

  11. Schedule Control and Nursing Home Quality: Exploratory Evidence of a Psychosocial Predictor of Resident Care.

    Science.gov (United States)

    Hurtado, David A; Berkman, Lisa F; Buxton, Orfeu M; Okechukwu, Cassandra A

    2016-02-01

    To examine whether nursing homes' quality of care was predicted by schedule control (workers' ability to decide work hours), independently of other staffing characteristics. Prospective ecological study of 30 nursing homes in New England. Schedule control was self-reported via survey in 2011-2012 (N = 1,045). Quality measures included the prevalence of decline in activities of daily living, residents' weight loss, and pressure ulcers, indicators systematically linked with staffing characteristics. Outcomes data for 2012 were retrieved from Medicare.gov. Robust Linear Regressions showed that higher schedule control predicted lower prevalence of pressure ulcers (β = -0.51, p job satisfaction, and turnover intentions. Higher schedule control might enhance the planning and delivery of strategies to prevent or cure pressure ulcers. Further research is needed to identify potential causal mechanisms by which schedule control could improve quality of care. © The Author(s) 2014.

  12. Energy-efficient TDMA medium access control protocol scheduling

    NARCIS (Netherlands)

    Havinga, Paul J.M.; Smit, Gerard J.M.

    2000-01-01

    In this paper we study the energy efficiency and channel efficiency of TDMA MAC protocol scheduling mechanisms. Most MAC protocols are based on phase grouping that basically has three phases in a frame: uplink, downlink and reservation. We propose a new mechanism in which we have multiple uplink and

  13. Learning Search Control Knowledge for Deep Space Network Scheduling

    Science.gov (United States)

    Gratch, Jonathan; Chien, Steve; DeJong, Gerald

    1993-01-01

    While the general class of most scheduling problems is NP-hard in worst-case complexity, in practice, for specific distributions of problems and constraints, domain-specific solutions have been shown to perform in much better than exponential time.

  14. Algorithm for Public Electric Transport Schedule Control for Intelligent Embedded Devices

    Science.gov (United States)

    Alps, Ivars; Potapov, Andrey; Gorobetz, Mikhail; Levchenkov, Anatoly

    2010-01-01

    In this paper authors present heuristics algorithm for precise schedule fulfilment in city traffic conditions taking in account traffic lights. The algorithm is proposed for programmable controller. PLC is proposed to be installed in electric vehicle to control its motion speed and signals of traffic lights. Algorithm is tested using real controller connected to virtual devices and real functional models of real tram devices. Results of experiments show high precision of public transport schedule fulfilment using proposed algorithm.

  15. Model Predictive Control of a Nonlinear System with Known Scheduling Variable

    DEFF Research Database (Denmark)

    Mirzaei, Mahmood; Poulsen, Niels Kjølstad; Niemann, Hans Henrik

    2012-01-01

    Model predictive control (MPC) of a class of nonlinear systems is considered in this paper. We will use Linear Parameter Varying (LPV) model of the nonlinear system. By taking the advantage of having future values of the scheduling variable, we will simplify state prediction. Consequently...... the control problem of the nonlinear system is simplied into a quadratic programming. Wind turbine is chosen as the case study and we choose wind speed as the scheduling variable. Wind speed is measurable ahead of the turbine, therefore the scheduling variable is known for the entire prediction horizon....

  16. Gender discrepancies in the outcomes of schedule control on overtime hours and income in Germany

    OpenAIRE

    Lott, Yvonne; Chung, Heejung

    2016-01-01

    Schedule control can have both positive – e.g., increased income – but also negative outcomes – e.g., increased overtime. Here our core interest is whether there are gender discrepancies in these outcomes. Given the different ways in which schedule control can be used, and perceived to be used by men and women, their outcomes are also expected to be different. This is examined using the German Socio-Economic Panel Study (2003-2011), and panel regression models. The results show that schedule ...

  17. Fuzzy gain scheduling of velocity PI controller with intelligent learning algorithm for reactor control

    International Nuclear Information System (INIS)

    Kim, Dong Yun; Seong, Poong Hyun

    1996-01-01

    In this study, we proposed a fuzzy gain scheduler with intelligent learning algorithm for a reactor control. In the proposed algorithm, we used the gradient descent method to learn the rule bases of a fuzzy algorithm. These rule bases are learned toward minimizing an objective function, which is called a performance cost function. The objective of fuzzy gain scheduler with intelligent learning algorithm is the generation of adequate gains, which minimize the error of system. The condition of every plant is generally changed as time gose. That is, the initial gains obtained through the analysis of system are no longer suitable for the changed plant. And we need to set new gains, which minimize the error stemmed from changing the condition of a plant. In this paper, we applied this strategy for reactor control of nuclear power plant (NPP), and the results were compared with those of a simple PI controller, which has fixed gains. As a result, it was shown that the proposed algorithm was superior to the simple PI controller

  18. Fuzzy gain scheduling of velocity PI controller with intelligent learning algorithm for reactor control

    International Nuclear Information System (INIS)

    Dong Yun Kim; Poong Hyun Seong; .

    1997-01-01

    In this research, we propose a fuzzy gain scheduler (FGS) with an intelligent learning algorithm for a reactor control. In the proposed algorithm, the gradient descent method is used in order to generate the rule bases of a fuzzy algorithm by learning. These rule bases are obtained by minimizing an objective function, which is called a performance cost function. The objective of the FGS with an intelligent learning algorithm is to generate gains, which minimize the error of system. The proposed algorithm can reduce the time and effort required for obtaining the fuzzy rules through the intelligent learning function. It is applied to reactor control of nuclear power plant (NPP), and the results are compared with those of a conventional PI controller with fixed gains. As a result, it is shown that the proposed algorithm is superior to the conventional PI controller. (author)

  19. A controlled genetic algorithm by fuzzy logic and belief functions for job-shop scheduling.

    Science.gov (United States)

    Hajri, S; Liouane, N; Hammadi, S; Borne, P

    2000-01-01

    Most scheduling problems are highly complex combinatorial problems. However, stochastic methods such as genetic algorithm yield good solutions. In this paper, we present a controlled genetic algorithm (CGA) based on fuzzy logic and belief functions to solve job-shop scheduling problems. For better performance, we propose an efficient representational scheme, heuristic rules for creating the initial population, and a new methodology for mixing and computing genetic operator probabilities.

  20. Decentralized controller gain scheduling using PSO for power ...

    African Journals Online (AJOL)

    For this reason, in this study the P and I control parameters are tuned based on Particle Swarm Optimization (PSO) algorithm for a better Load-Frequency Control in a Two-Area Two-Unit Thermal Reheat Power System (TATURIPS) with step load perturbation. To exemplify the optimum parameter search PSO is used as it is ...

  1. Scheduling and control of programs in the CICADA computer system for TFTR

    International Nuclear Information System (INIS)

    Christianson, G.B.; Sherrick, M.; Stark, W.

    1983-01-01

    The CICADA computer system is a network of super minicomputers for data acquisition, reduction, display and device control on the TFTR experiment. Human interaction with the CICADA system is accomplished by consoles offering color displays with a high degree of operator interaction with the computer system, and by interactive terminals offering a limited degree of operator interaction. The authors describe the software packages and data bases used to control the consoles and provide communication to an application program attached to a console. The console control program in its turn schedules the execution of control programs that furnish operating system interfaces to applications programs executing at a console or terminal (in response to human activation), or upon activation by scheduling tasks. The control programs handle functions such as applications task activation. They discuss the implementation of the control programs in the multi-computer CICADA environment, and describe the control program data bases. In a TFTR shot cycle, applications programs must be scheduled for activation at operator-defined stages, in order to accomplish the arming of hardware devices, acquisition of summary waveform data, and the acquisition and archiving of raw data. The authors describe the software tasks and data bases of the CICADA event system, which accomplishes this scheduling of applications task activation in conjunction with the control programs. Future enhancements planned for the console control, program control, and event systems are outlined

  2. Schedules of controlled substances: extension of temporary placement of UR-144, XLR11, and AKB48 in schedule I of the Controlled Substances Act. Final order.

    Science.gov (United States)

    2015-05-15

    The Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to extend the temporary placement of (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48), including their salts, isomers, and salts of isomers whenever the existence of such salts, isomers, and salts of isomers is possible, in schedule I of the Controlled Substances Act. The current final order temporarily placing UR-144, XLR11, and AKB48 in schedule I is due to expire on May 15, 2015. This final order will extend the temporary scheduling of UR-144, XLR11, and AKB48 to May 15, 2016, or until the permanent scheduling action for these three substances is completed, whichever occurs first.

  3. Reliable gain-scheduled control of discrete-time systems and its application to CSTR model

    Science.gov (United States)

    Sakthivel, R.; Selvi, S.; Mathiyalagan, K.; Shi, Y.

    2016-10-01

    This paper is focused on reliable gain-scheduled controller design for a class of discrete-time systems with randomly occurring nonlinearities and actuator fault. Further, the nonlinearity in the system model is assumed to occur randomly according to a Bernoulli distribution with measurable time-varying probability in real time. The main purpose of this paper is to design a gain-scheduled controller by implementing a probability-dependent Lyapunov function and linear matrix inequality (LMI) approach such that the closed-loop discrete-time system is stochastically stable for all admissible randomly occurring nonlinearities. The existence conditions for the reliable controller is formulated in terms of LMI constraints. Finally, the proposed reliable gain-scheduled control scheme is applied on continuously stirred tank reactor model to demonstrate the effectiveness and applicability of the proposed design technique.

  4. Schedule-controlled learning and memory in a regulatory context

    Science.gov (United States)

    Control of behavior by the manipulation of contingencies provides powerful techniques for assessing the hazard of chemical toxicants on the nervous system. When applied to evaluate the consequences of developmental exposure, these techniques are well suited for characterizing per...

  5. Intelligent control of diesel generators using gain-scheduling

    DEFF Research Database (Denmark)

    Mai, Christian; Jepsen, Kasper; Yang, Zhenyu

    2014-01-01

    The development of an intelligent control solution for a wide range of diesel generators is discussed. Compared with most existing solutions, the advantages of the proposed solution lie in two folds: (i) The proposed control has the plug-and-play capability which is reflected by an automatic...... recognition procedure when it is plugged into a specific diesel generator, such that some extensive manual-tuning of the installed controller can be significantly reduced; (ii) The proposed control has an real-time adaptability by using the online external load estimation, such that the integrated system can...... keep a consistent performance for a wide range of operating conditions. Technically, a general nonlinear dynamic model is firstly developed based on fundamental principles of diesel generators. Then, the system parameters of this model can be identified experimentally or partially retrieved from...

  6. Resource-aware control and dynamic scheduling in CPS

    NARCIS (Netherlands)

    Heemels, W.P.M.H.

    2015-01-01

    Recent developments in computer and communication technologies are leading to an increasingly networked and wireless world. This raises new challenging questions in the context of control for cyberphysical systems (CPS), especially when the computation, communication, energy and actuation resources

  7. Robust control for spacecraft rendezvous system with actuator unsymmetrical saturation: a gain scheduling approach

    Science.gov (United States)

    Wang, Qian; Xue, Anke

    2018-06-01

    This paper has proposed a robust control for the spacecraft rendezvous system by considering the parameter uncertainties and actuator unsymmetrical saturation based on the discrete gain scheduling approach. By changing of variables, we transform the actuator unsymmetrical saturation control problem into a symmetrical one. The main advantage of the proposed method is improving the dynamic performance of the closed-loop system with a region of attraction as large as possible. By the Lyapunov approach and the scheduling technology, the existence conditions for the admissible controller are formulated in the form of linear matrix inequalities. The numerical simulation illustrates the effectiveness of the proposed method.

  8. Gain-Scheduled Model Predictive Control of Wind Turbines using Laguerre Functions

    DEFF Research Database (Denmark)

    Adegas, Fabiano Daher; Wisniewski, Rafal; Larsen, Lars Finn Sloth

    2014-01-01

    This paper presents a systematic approach to design gain-scheduled predictive controllers for wind turbines. The predictive control law is based on Laguerre functions to parameterize control signals and a parameter-dependent cost function that is analytically determined from turbine data....... These properties facilitate the design of speed controllers by placement of the closed-loop poles (when constraints are not active) and systematic adaptation towards changes in the operating point. Vibration control of undamped modes is achieved by imposing a certain degree of stability to the closed-loop system....... The approach can be utilized to the design of new controllers and to represent existing gain-scheduled controllers as predictive controllers. The numerical example and simulations illustrate the design of a speed controller augmented with active damping of the tower fore-aft displacement....

  9. Gain Scheduling of PID Controller Based on Fuzzy Systems

    Directory of Open Access Journals (Sweden)

    Singh Sandeep

    2016-01-01

    Full Text Available This paper aims to utilize fuzzy rules and reasoning to determine the controller parameters and the PID controller generates the control signal. The objective of this study is to simulate the proposed scheme on various processes and arrive at results providing better response of the system when compared with best industrial auto-tuning technique: Ziegler-Nichols. The proposed scheme is based upon the Ultimate Gain (Ku and the Period (Tu of the system. The error and rate of change in error gains are tuned manually to get the desired response using LabVIEW. This can also be done with various optimization techniques. A thumb rule for choosing the ranges for Kc, Kd and Ki has been obtained experimentally.

  10. Changing Workplaces to Reduce Work-Family Conflict: Schedule Control in a White-Collar Organization.

    Science.gov (United States)

    Kelly, Erin L; Moen, Phyllis; Tranby, Eric

    2011-04-01

    Work-family conflicts are common and consequential for employees, their families, and work organizations. Can workplaces be changed to reduce work-family conflict? Previous research has not been able to assess whether workplace policies or initiatives succeed in reducing work-family conflict or increasing work-family fit. Using longitudinal data collected from 608 employees of a white-collar organization before and after a workplace initiative was implemented, we investigate whether the initiative affects work-family conflict and fit, whether schedule control mediates these effects, and whether work demands, including long hours, moderate the initiative's effects on work-family outcomes. Analyses clearly demonstrate that the workplace initiative positively affects the work-family interface, primarily by increasing employees' schedule control. This study points to the importance of schedule control for our understanding of job quality and for management policies and practices.

  11. Efficient operation scheduling for adsorption chillers using predictive optimization-based control methods

    Science.gov (United States)

    Bürger, Adrian; Sawant, Parantapa; Bohlayer, Markus; Altmann-Dieses, Angelika; Braun, Marco; Diehl, Moritz

    2017-10-01

    Within this work, the benefits of using predictive control methods for the operation of Adsorption Cooling Machines (ACMs) are shown on a simulation study. Since the internal control decisions of series-manufactured ACMs often cannot be influenced, the work focuses on optimized scheduling of an ACM considering its internal functioning as well as forecasts for load and driving energy occurrence. For illustration, an assumed solar thermal climate system is introduced and a system model suitable for use within gradient-based optimization methods is developed. The results of a system simulation using a conventional scheme for ACM scheduling are compared to the results of a predictive, optimization-based scheduling approach for the same exemplary scenario of load and driving energy occurrence. The benefits of the latter approach are shown and future actions for application of these methods for system control are addressed.

  12. Managing unforeseen events in production scheduling and control

    DEFF Research Database (Denmark)

    Arica, E.; Falster, Peter; Hvolby, H. H.

    2016-01-01

    initial plans unfeasible or obsolete during production execution. How to effectively handle the unscheduled events and take corrective actions still remains a central question to academics and practitioners. In this paper, we explore this issue through a review of the relevant literature and an in......The production planning and control process is performed within complex and dynamic organizations made up of customer expectations, equipment, materials, people, information, and technologies. Changes in both internal and external factors can create a variety of unforeseen events, which make...

  13. Fuzzy gain scheduling of velocity PI controller with intelligent learning algorithm for reactor control

    International Nuclear Information System (INIS)

    Kim, Dong Yun

    1997-02-01

    In this research, we propose a fuzzy gain scheduler (FGS) with an intelligent learning algorithm for a reactor control. In the proposed algorithm, the gradient descent method is used in order to generate the rule bases of a fuzzy algorithm by learning. These rule bases are obtained by minimizing an objective function, which is called a performance cost function. The objective of the FGS with an intelligent learning algorithm is to generate adequate gains, which minimize the error of system. The proposed algorithm can reduce the time and efforts required for obtaining the fuzzy rules through the intelligent learning function. The evolutionary programming algorithm is modified and adopted as the method in order to find the optimal gains which are used as the initial gains of FGS with learning function. It is applied to reactor control of nuclear power plant (NPP), and the results are compared with those of a conventional PI controller with fixed gains. As a result, it is shown that the proposed algorithm is superior to the conventional PI controller

  14. Robust Model Predictive Control of a Nonlinear System with Known Scheduling Variable and Uncertain Gain

    DEFF Research Database (Denmark)

    Mirzaei, Mahmood; Poulsen, Niels Kjølstad; Niemann, Hans Henrik

    2012-01-01

    Robust model predictive control (RMPC) of a class of nonlinear systems is considered in this paper. We will use Linear Parameter Varying (LPV) model of the nonlinear system. By taking the advantage of having future values of the scheduling variable, we will simplify state prediction. Because...... of the special structure of the problem, uncertainty is only in the B matrix (gain) of the state space model. Therefore by taking advantage of this structure, we formulate a tractable minimax optimization problem to solve robust model predictive control problem. Wind turbine is chosen as the case study and we...... choose wind speed as the scheduling variable. Wind speed is measurable ahead of the turbine, therefore the scheduling variable is known for the entire prediction horizon....

  15. An Application-Level QoS Control Method Based on Local Bandwidth Scheduling

    Directory of Open Access Journals (Sweden)

    Yong Wang

    2018-01-01

    Full Text Available Quality of service (QoS is an important performance indicator for Web applications and bandwidth is a key factor affecting QoS. Current methods use network protocols or ports to schedule bandwidth, which require tedious manual configurations or modifications of the underlying network. Some applications use dynamic ports and the traditional port-based bandwidth control methods cannot deal with them. A new QoS control method based on local bandwidth scheduling is proposed, which can schedule bandwidth at application level in a user-transparent way and it does not require tedious manual configurations. Experimental results indicate that the new method can effectively improve the QoS for applications, and it can be easily integrated into current Web applications without the need to modify the underlying network.

  16. Measles outbreak in Greater Manchester, England, October 2012 to September 2013: epidemiology and control.

    Science.gov (United States)

    Pegorie, M; Shankar, K; Welfare, W S; Wilson, R W; Khiroya, C; Munslow, G; Fiefield, D; Bothra, V; McCann, R

    2014-12-11

    This paper describes the epidemiology and management of a prolonged outbreak of measles across the 2.7 million conurbation of Greater Manchester in the United Kingdom. Over a period of one year (from October 2012 to September 2013), over a thousand suspected measles cases (n = 1,073) were notified across Greater Manchester; of these, 395 (37%) were laboratory-confirmed, 91 (8%) were classed as probable, 312 (29%) were classed as possible and 275 (26%) excluded. Most confirmed and probable cases occurred in children within two age groups—infants (too young to be eligible for measles-mumps-rubella (MMR) vaccination according to the national immunisation programme) and children aged 10-19 years (low vaccine uptake in this cohort because of unfounded alleged links between the MMR vaccine and autism). During this one year period, there were a series of local outbreaks and many of these occurred within the secondary school setting. A series of public health measures were taken to control this prolonged outbreak: setting up incident management teams to control local outbreaks, a concerted immunisation catch-up campaign (initially local then national) to reduce the pool of children partially or totally unprotected against measles, and the exclusion of close contacts from nurseries and school settings for a period of 10 days following the last exposure to a case of measles.

  17. 75 FR 15642 - Schedules of Controlled Substances: Exempted Prescription Product; River Edge Pharmaceutical...

    Science.gov (United States)

    2010-03-30

    ... 1117-AB28 Schedules of Controlled Substances: Exempted Prescription Product; River Edge Pharmaceutical... new applications for exemption. DEA has received one new application for exemption for River Edge... application for exemption pursuant to the provisions of 21 CFR 1308.32 for: River Edge Pharmaceutical's...

  18. Project orie:nta.teci pla.:n:ni:ng, scheduling a.:nci controlling technique

    African Journals Online (AJOL)

    Review Technique. By October 1958 it ... (CPM) to schedule and control a very large project. and during the ... objectives are identified and the total job is broken down into ..... jobs in a single shop or shops in the plant, to scheduf- ing plants ...

  19. A Case Study of Line-of-Balance based Schedule Planning and Control System

    OpenAIRE

    Seppänen, Olli; Aalto, Erno

    2005-01-01

    Line-of-Balance is a graphical technique which can be used to plan and manage work flow. It is suit-able for construction projects because of their large degree of repetition. Despite its strengths Line-of-Balance has not gained widespread use in construction industry internationally. However, it has been used as the principal scheduling tool in Finland since 1980s. As a result of two decades of research and use in industry, a comprehensive schedule planning and control system has been develo...

  20. Coordinated Scheduling and Power Control in Cloud-Radio Access Networks

    KAUST Repository

    Douik, Ahmed; Dahrouj, Hayssam; Al-Naffouri, Tareq Y.; Alouini, Mohamed-Slim

    2015-01-01

    This paper addresses the joint coordinated scheduling and power control problem in cloud-enabled networks. Consider the downlink of a cloud-radio access network (CRAN), where the cloud is only responsible for the scheduling policy, power control, and synchronization of the transmit frames across the single-antenna base-stations (BS). The transmit frame consists of several time/frequency blocks, called power-zones (PZ). The paper considers the problem of scheduling users to PZs and determining their power levels (PL), by maximizing the weighted sum-rate under the practical constraints that each user cannot be served by more than one base-station, but can be served by one or more power-zones within each base-station frame. The paper solves the problem using a graph theoretical approach by introducing the joint scheduling and power control graph formed by several clusters, where each is formed by a set of vertices, representing the possible association of users, BSs, and PLs for one specific PZ. The problem is, then, formulated as a maximumweight clique problem, in which the weight of each vertex is the sum of the benefits of the individual associations belonging to that vertex. Simulation results suggest that the proposed crosslayer scheme provides appreciable performance improvement as compared to schemes from recent literature.

  1. Coordinated Scheduling and Power Control in Cloud-Radio Access Networks

    KAUST Repository

    Douik, Ahmed

    2015-12-01

    This paper addresses the joint coordinated scheduling and power control problem in cloud-enabled networks. Consider the downlink of a cloud-radio access network (CRAN), where the cloud is only responsible for the scheduling policy, power control, and synchronization of the transmit frames across the single-antenna base-stations (BS). The transmit frame consists of several time/frequency blocks, called power-zones (PZ). The paper considers the problem of scheduling users to PZs and determining their power levels (PL), by maximizing the weighted sum-rate under the practical constraints that each user cannot be served by more than one base-station, but can be served by one or more power-zones within each base-station frame. The paper solves the problem using a graph theoretical approach by introducing the joint scheduling and power control graph formed by several clusters, where each is formed by a set of vertices, representing the possible association of users, BSs, and PLs for one specific PZ. The problem is, then, formulated as a maximumweight clique problem, in which the weight of each vertex is the sum of the benefits of the individual associations belonging to that vertex. Simulation results suggest that the proposed crosslayer scheme provides appreciable performance improvement as compared to schemes from recent literature.

  2. Hybrid LSA-ANN Based Home Energy Management Scheduling Controller for Residential Demand Response Strategy

    Directory of Open Access Journals (Sweden)

    Maytham S. Ahmed

    2016-09-01

    Full Text Available Demand response (DR program can shift peak time load to off-peak time, thereby reducing greenhouse gas emissions and allowing energy conservation. In this study, the home energy management scheduling controller of the residential DR strategy is proposed using the hybrid lightning search algorithm (LSA-based artificial neural network (ANN to predict the optimal ON/OFF status for home appliances. Consequently, the scheduled operation of several appliances is improved in terms of cost savings. In the proposed approach, a set of the most common residential appliances are modeled, and their activation is controlled by the hybrid LSA-ANN based home energy management scheduling controller. Four appliances, namely, air conditioner, water heater, refrigerator, and washing machine (WM, are developed by Matlab/Simulink according to customer preferences and priority of appliances. The ANN controller has to be tuned properly using suitable learning rate value and number of nodes in the hidden layers to schedule the appliances optimally. Given that finding proper ANN tuning parameters is difficult, the LSA optimization is hybridized with ANN to improve the ANN performances by selecting the optimum values of neurons in each hidden layer and learning rate. Therefore, the ON/OFF estimation accuracy by ANN can be improved. Results of the hybrid LSA-ANN are compared with those of hybrid particle swarm optimization (PSO based ANN to validate the developed algorithm. Results show that the hybrid LSA-ANN outperforms the hybrid PSO based ANN. The proposed scheduling algorithm can significantly reduce the peak-hour energy consumption during the DR event by up to 9.7138% considering four appliances per 7-h period.

  3. Engine Torque Control of Spark Ignition Engine using Fuzzy Gain Scheduling

    OpenAIRE

    Aris Triwiyatno

    2012-01-01

    In the spark ignition engine system, driver convenience is very dependent on satisfying engine torque appropriate with the throttle position given by the driver. Unfortunately, sometimes the fulfillment of engine torque is not in line with fuel saving efforts. This requires the development of high performance and robust power train controllers. One way to potentially meet these performance requirements is to introduce a method of controlling engine torque using fuzzy gain scheduling. By using...

  4. MULTISHAPE TASK SCHEDULING ALGORITHM FOR REAL TIME MICRO-CONTROLLER BASED APPLICATION

    OpenAIRE

    Ankur Jain

    2017-01-01

    Embedded Systems are usually microcontroller-based systems that represent a class of reliable and dependable dedicated computer systems designed for specific purposes. Micro-controllers are used in most electronic devices in an endless variety of ways. Some micro-controller-based embedded systems are required to respond to external events in the shortest possible time and such systems are known as realtime embedded systems. So in multitasking system there is a need of task Scheduling, there a...

  5. A cost/schedule and control system for the environmental restoration program Albuquerque Field Office

    International Nuclear Information System (INIS)

    Fiske, Wanda S.; Bischoff, Edward L.; Rea, Kenneth H.; Dwain Farley, P.; Biedermann, Charles A.

    1992-01-01

    The Department of Energy (DOE) Field Office Albuquerque (AL), Environmental Restoration Project Office (ERPO), has developed a project management system used to plan, document, and control Environmental Restoration (ER) work at eight installations and one superfund site managed by AL. This system emphasizes control of the cost, schedule, and technical elements of the Program. It supports programmatic documentation such as the Environmental Restoration/Waste Management Five-Year Plan, Site Specific Plan, and budget requests. The System provides information used to manage the ER Program at all levels of management (i.e., from low-level day-to-day activities to high-level upper management). The System requires substantial effort to ensure reliability; however, the benefit to ERPO is an effective, proactive project management tool. This paper provides an overview of the ERPO System, an explanation of how it is implemented, and lessons learned from this process. Application of the System to cost estimating, annual and five-year budget preparation, resource projections, scheduling, and cost/schedule performance measurement is discussed. Also discussed are cost/schedule review procedures, along with variance identification and resolution. Examples are taken from the Pinellas ER Program. (author)

  6. Schedule-induced masseter EMG in facial pain subjects vs. no-pain controls.

    Science.gov (United States)

    Gramling, S E; Grayson, R L; Sullivan, T N; Schwartz, S

    1997-02-01

    Empirical reports suggest that oral habits (e.g., teeth clenching) may be behavioral mediators linking stress to muscle hyperreactivity and the development of facial pain. Another report suggests that excessive behavioral adjuncts develop in conjunction with fixed-time stimulus presentation. The present study assessed the extent to which the oral habits exhibited by facial pain patients are schedule-induced. Subjects with Temporomandibular Disorder (TMD) symptomatology (n = 15) and pain-free controls (n = 15) participated in a 4-phase experiment (adaptation, baseline, task, recovery) designed to elicit schedule-induced behaviors. Self-report of oral habits and negative affect were recorded after each phase. Objective measures of oral habits were obtained via behavioral observation and masseter EMG recordings. Results revealed that negative arousal significantly increased during the fixed-time (FT) task and was also associated with increased oral habits among the TMD subjects. Moreover, 40% of the TMD subjects and none of the controls exhibited a pattern of EMG elevations in the early part of the inter-stimulus interval that met a strict criteria for scheduled-induced behavior per se. Taken together, these results suggest that the TMD subjects were engaging in schedule-induced oral habits. The adjunctive behavior literature seems to provide a plausible explanation as to how oral habits develop and are maintained in TMD patients, despite their painful consequences.

  7. 32 CFR 169a.8 - Inventory and review schedule (Report Control Symbol DD-P&L(A)).

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Inventory and review schedule (Report Control... OF DEFENSE DEFENSE CONTRACTING COMMERCIAL ACTIVITIES PROGRAM PROCEDURES Procedures § 169a.8 Inventory and review schedule (Report Control Symbol DD-P&L(A)). (a) Information in each DoD Component's...

  8. Gain-scheduled Linear Quadratic Control of Wind Turbines Operating at High Wind Speed

    DEFF Research Database (Denmark)

    Østergaard, Kasper Zinck; Stoustrup, Jakob; Brath, Per

    2007-01-01

    This paper addresses state estimation and linear quadratic (LQ) control of variable speed variable pitch wind turbines. On the basis of a nonlinear model of a wind turbine, a set of operating conditions is identified and a LQ controller is designed for each operating point. The controller gains...... are then interpolated linearly to get a control law for the entire operating envelope. A nonlinear state estimator is designed as a combination of two unscented Kalman filters and a linear disturbance estimator. The gain-scheduling variable (wind speed) is then calculated from the output of these state estimators...

  9. Scheduling and control strategies for the departure problem in air traffic control

    Science.gov (United States)

    Bolender, Michael Alan

    Two problems relating to the departure problem in air traffic control automation are examined. The first problem that is addressed is the scheduling of aircraft for departure. The departure operations at a major US hub airport are analyzed, and a discrete event simulation of the departure operations is constructed. Specifically, the case where there is a single departure runway is considered. The runway is fed by two queues of aircraft. Each queue, in turn, is fed by a single taxiway. Two salient areas regarding scheduling are addressed. The first is the construction of optimal departure sequences for the aircraft that are queued. Several greedy search algorithms are designed to minimize the total time to depart a set of queued aircraft. Each algorithm has a different set of heuristic rules to resolve situations within the search space whenever two branches of the search tree with equal edge costs are encountered. These algorithms are then compared and contrasted with a genetic search algorithm in order to assess the performance of the heuristics. This is done in the context of a static departure problem where the length of the departure queue is fixed. A greedy algorithm which deepens the search whenever two branches of the search tree with non-unique costs are encountered is shown to outperform the other heuristic algorithms. This search strategy is then implemented in the discrete event simulation. A baseline performance level is established, and a sensitivity analysis is performed by implementing changes in traffic mix, routing, and miles-in-trail restrictions for comparison. It is concluded that to minimize the average time spent in the queue for different traffic conditions, a queue assignment algorithm is needed to maintain an even balance of aircraft in the queues. A necessary consideration is to base queue assignment upon traffic management restrictions such as miles-in-trail constraints. The second problem addresses the technical challenges associated

  10. Backyard chicken keeping in the Greater London Urban Area: welfare status, biosecurity and disease control issues.

    Science.gov (United States)

    Karabozhilova, I; Wieland, B; Alonso, S; Salonen, L; Häsler, B

    2012-01-01

    1. The aim of the study was to collect baseline data on welfare, biosecurity and diseases of backyard chickens kept in the Greater London Urban Area (GLUA), United Kingdom (UK). 2. A total of 65 backyard chicken flock-keepers were recruited from May to July 2010 through adverts on websites, at City farms, veterinary practices and pet feed stores and surveyed by means of a questionnaire. A total of 30 responses were suitable for analysis. 3. Information on keepers' and flocks' characteristics, housing and husbandry practices and owners' knowledge of health problems in chickens and zoonotic diseases was collected. A welfare assessment protocol was developed and the flocks assessed accordingly. 4. Results showed that chickens were generally provided with living conditions that allowed them to perform their natural behaviours. 5. Most of the flock owners did not comply with the regulations of the Department for Environment, Food and Rural Affairs (Defra) on the feeding of catering waste. 6. Disease prevention measures such as vaccination and biosecurity, including limiting the access of human visitors, wild birds and rodents to the flocks were rare. 7. A lack of avian and zoonotic disease knowledge and awareness among the owners has implications for disease control and highlights the need for improved communication between owners, authorities and veterinarians.

  11. Cyclists Have Greater Chondromalacia Index Than Age-Matched Controls at the Time of Hip Arthroscopy.

    Science.gov (United States)

    Stone, Austin V; Howse, Elizabeth A; Mannava, Sandeep; Stubbs, Allston J

    2016-10-01

    To evaluate the clinical symptoms and intraoperative pathology associated with hip pain in the cyclist compared with a matched hip arthroscopy surgical group. In an institutional review board-approved study, we retrospectively reviewed a prospective database of 1,200 consecutive hip arthroscopy patients from 2008 to 2015. Adult patients were identified who reported cycling as a major component of their activity. Patients were age, gender, and body mass index matched to a control, noncycling group. Pain symptoms, preoperative examinations, radiographic and operative findings were compared. Primary outcome variables included the femoral and acetabular Outerbridge chondromalacia grade. Additional outcome measurements included the involved area and the chondromalacia index (CMI; the product of the Outerbridge chondromalacia grade and surface area [mm 2  × severity]). A total of 167 noncyclists were matched to the cycling group (n = 16). Cyclists had significantly greater femoral head chondromalacia grade (2.0 [95% confidence interval (CI), 1.5-2.5] v 1.4 [95% CI, 1.3-1.6], P = .043), femoral head chondromalacia area (242 mm 2 [95% CI, 191-293 mm 2 ] v 128 mm 2 [95% CI, 113-141 mm 2 ], P chondromalacia than a matched group of noncyclists. Cycling activity positively correlated with the presence of femoral chondromalacia with clinically significant gait alterations. These data support the hypothesis that cyclists with hip pain have more chondral pathology than a similar group of other patients with hip pain. Ultimately, cyclists with hip pain should be identified as higher risk for more advanced chondral damage. Level III, case-control study, therapeutic. Copyright © 2016 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  12. Online Dynamic Balance Technology for High Speed Spindle Based on Gain Parameter Adaption and Scheduling Control

    Directory of Open Access Journals (Sweden)

    Shihai Zhang

    2018-06-01

    Full Text Available Unbalance vibration is one of the main vibration forms of a high speed machine tool spindle. The overlarge unbalance vibration will have some adverse effects on the working life of the spindle system and the surface quality of the work-piece. In order to reduce the unbalance of a high speed spindle system, a pneumatic online dynamic balance device and its control system are presented in the paper. To improve the balance accuracy and adaptation of the balance system, the gain parameter adaption and scheduling control method are proposed first, and then the different balance effects of the influence coefficient method and the gain scheduling control method are compared through many dynamic balance experiments of the high speed spindle. The experimental results indicate that the gain parameters can be changed timely according to the transformation of the speed and kinetic parameters of the spindle system. The balance accuracy can be improved for a high speed spindle with time-varying characteristics, based on the adaptive gain scheduling control method.

  13. Schedules of electric shock presentation in the behavioral control of imprinted ducklings.

    Science.gov (United States)

    Barrett, J E

    1972-09-01

    The behavioral effects of various schedules of electric shock presentation were investigated during and after the imprinting of Peking ducklings to moving stimuli. The behavior of following a moving imprinted stimulus was differentially controlled by a multiple schedule of punishment and avoidance that respectively suppressed and maintained following behavior. Pole-pecking, reinforced by presentations of the imprinted stimulus, was suppressed by response-produced shock (punishment); various schedules of response-independent shock and delayed punishment had an overall minimal effect. The delivery of response-independent shock in the presence of one of two stimuli, both during and after imprinting, resulted in a marked reduction in choice of the stimulus paired with shock. The experiments provide no support for a differentiation of imprinting from learning on the basis of the behavioral effects of aversive stimuli. Instead, as is the case with other organisms, the schedule under which shock is delivered to imprinted ducklings appears to be an important determinant of the temporal patterning of subsequent behavior.

  14. A Dynamic Resource Scheduling Method Based on Fuzzy Control Theory in Cloud Environment

    Directory of Open Access Journals (Sweden)

    Zhijia Chen

    2015-01-01

    Full Text Available The resources in cloud environment have features such as large-scale, diversity, and heterogeneity. Moreover, the user requirements for cloud computing resources are commonly characterized by uncertainty and imprecision. Hereby, to improve the quality of cloud computing service, not merely should the traditional standards such as cost and bandwidth be satisfied, but also particular emphasis should be laid on some extended standards such as system friendliness. This paper proposes a dynamic resource scheduling method based on fuzzy control theory. Firstly, the resource requirements prediction model is established. Then the relationships between resource availability and the resource requirements are concluded. Afterwards fuzzy control theory is adopted to realize a friendly match between user needs and resources availability. Results show that this approach improves the resources scheduling efficiency and the quality of service (QoS of cloud computing.

  15. Effects of caffeine, theophylline and theobromine on scheduled controlled responding in rats.

    Science.gov (United States)

    Carney, J. M.

    1982-01-01

    1 Rats were trained to respond under a variable interval 30 s (VI 30) schedule of food reinforcement. Caffeine (0.32-32 mg/kg), theophylline (1.0-56 mg/kg) and theobromine (10-320 mg/kg) in general produced dose-related decreases in operant responding. At relatively low doses, caffeine (1.0 mg/kg) and theophylline (3.2 mg/kg) produced slight but nonsignificant increases in VI 30 responding. 3 The rank order of potency for producing decreases in responding was caffeine greater than theophylline greater than theobromine. 4 Daily caffeine injections (32 mg/kg, i.p.) resulted in the development of caffeine tolerance. This tolerance was characterized by a 6 fold shift to the right in the caffeine dose-effect curve. Saline substitution for the 32.0 mg/kg caffeine maintenance dose resulted in a substantial decrease in responding. PMID:7066599

  16. Congestion Control and Traffic Scheduling for Collaborative Crowdsourcing in SDN Enabled Mobile Wireless Networks

    Directory of Open Access Journals (Sweden)

    Dawei Shen

    2018-01-01

    Full Text Available Currently, a number of crowdsourcing-based mobile applications have been implemented in mobile networks and Internet of Things (IoT, targeted at real-time services and recommendation. The frequent information exchanges and data transmissions in collaborative crowdsourcing are heavily injected into the current communication networks, which poses great challenges for Mobile Wireless Networks (MWN. This paper focuses on the traffic scheduling and load balancing problem in software-defined MWN and designs a hybrid routing forwarding scheme as well as a congestion control algorithm to achieve the feasible solution. The traffic scheduling algorithm first sorts the tasks in an ascending order depending on the amount of tasks and then solves it using a greedy scheme. In the proposed congestion control scheme, the traffic assignment is first transformed into a multiknapsack problem, and then the Artificial Fish Swarm Algorithm (AFSA is utilized to solve this problem. Numerical results on practical network topology reveal that, compared with the traditional schemes, the proposed congestion control and traffic scheduling schemes can achieve load balancing, reduce the probability of network congestion, and improve the network throughput.

  17. Schedules of Controlled Substances: Temporary Placement of Six Synthetic Cannabinoids (5F-ADB, 5F-AMB, 5F-APINACA, ADB-FUBINACA, MDMB-CHMICA and MDMB-FUBINACA) into Schedule I. Temporary Scheduling Order.

    Science.gov (United States)

    2017-04-10

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule six synthetic cannabinoids: methyl 2-(1-(5-fluoropentyl)-1H-indazole-3-carboxamido)-3,3-dimethylbutanoate [5F-ADB; 5F-MDMB-PINACA]; methyl 2-(1-(5-fluoropentyl)-1H-indazole-3-carboxamido)-3-methylbutanoate [5F-AMB]; N-(adamantan-1-yl)-1-(5-fluoropentyl)-1H-indazole-3-carboxamide [5F-APINACA, 5F-AKB48]; N-(1-amino-3,3-dimethyl-1-oxobutan-2-yl)-1-(4-fluorobenzyl)-1H-indazole-3-carboxamide [ADB-FUBINACA]; methyl 2-(1-(cyclohexylmethyl)-1H-indole-3-carboxamido)-3,3-dimethylbutanoate [MDMB-CHMICA, MMB-CHMINACA] and methyl 2-(1-(4-fluorobenzyl)-1H-indazole-3-carboxamido)-3,3-dimethylbutanoate [MDMB-FUBINACA], and their optical, positional, and geometric isomers, salts, and salts of isomers into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of these synthetic cannabinoids into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 5F-ADB, 5F-AMB, 5F-APINACA, ADB-FUBINACA, MDMB-CHMICA or MDMB-FUBINACA.

  18. Vegetation exerts a greater control on litter decomposition than climate warming in peatlands.

    Science.gov (United States)

    Ward, Susan E; Orwin, Kate H; Ostle, Nicholas J; Briones, J I; Thomson, Bruce C; Griffiths, Robert I; Oakley, Simon; Quirk, Helen; Bardget, Richard D

    2015-01-01

    Historically, slow decomposition rates have resulted in the accumulation of large amounts of carbon in northern peatlands. Both climate warming and vegetation change can alter rates of decomposition, and hence affect rates of atmospheric CO2 exchange, with consequences for climate change feedbacks. Although warming and vegetation change are happening concurrently, little is known about their relative and interactive effects on decomposition processes. To test the effects of warming and vegetation change on decomposition rates, we placed litter of three dominant species (Calluna vulgaris, Eriophorum vaginatum, Hypnum jutlandicum) into a peatland field experiment that combined warming.with plant functional group removals, and measured mass loss over two years. To identify potential mechanisms behind effects, we also measured nutrient cycling and soil biota. We found that plant functional group removals exerted a stronger control over short-term litter decomposition than did approximately 1 degrees C warming, and that the plant removal effect depended on litter species identity. Specifically, rates of litter decomposition were faster when shrubs were removed from the plant community, and these effects were strongest for graminoid and bryophyte litter. Plant functional group removals also had strong effects on soil biota and nutrient cycling associated with decomposition, whereby shrub removal had cascading effects on soil fungal community composition, increased enchytraeid abundance, and increased rates of N mineralization. Our findings demonstrate that, in addition to litter quality, changes in vegetation composition play a significant role in regulating short-term litter decomposition and belowground communities in peatland, and that these impacts can be greater than moderate warming effects. Our findings, albeit from a relatively short-term study, highlight the need to consider both vegetation change and its impacts below ground alongside climatic effects when

  19. Electromagnetic interference-aware transmission scheduling and power control for dynamic wireless access in hospital environments.

    Science.gov (United States)

    Phunchongharn, Phond; Hossain, Ekram; Camorlinga, Sergio

    2011-11-01

    We study the multiple access problem for e-Health applications (referred to as secondary users) coexisting with medical devices (referred to as primary or protected users) in a hospital environment. In particular, we focus on transmission scheduling and power control of secondary users in multiple spatial reuse time-division multiple access (STDMA) networks. The objective is to maximize the spectrum utilization of secondary users and minimize their power consumption subject to the electromagnetic interference (EMI) constraints for active and passive medical devices and minimum throughput guarantee for secondary users. The multiple access problem is formulated as a dual objective optimization problem which is shown to be NP-complete. We propose a joint scheduling and power control algorithm based on a greedy approach to solve the problem with much lower computational complexity. To this end, an enhanced greedy algorithm is proposed to improve the performance of the greedy algorithm by finding the optimal sequence of secondary users for scheduling. Using extensive simulations, the tradeoff in performance in terms of spectrum utilization, energy consumption, and computational complexity is evaluated for both the algorithms.

  20. Studies of murine tumor control using x-ray fractionation schedules alone or in combination with hyperthermia

    International Nuclear Information System (INIS)

    Imbra, R.J.

    1981-01-01

    The effectiveness of an experimental radiation fractionation schedule of decreasing-sized dose fractions administered at optimal time intervals was compared with a conventional fractionation schedule of constant-sized dose fractions administered five times per week. Also, the effect of the addition of hyperthermia (42.5 0 C) to radiation therapy was investigated. For some experiments, Ehrlich mammary tumors were growth in the right thighs of Swiss mice. The tumor response was determined by measuring the tumor-bearing leg diameter and converting this value to volume. The time for the treated tumor to regrow to its pre-tratment volume was used as an endpoint in Swiss mice. The maximum total treatment dose is limited by the amount of normal tissue damage. A total treatment dose of six thousand rads was most suitable for the further investigations. Definitive investigations were performed using the RIF-1 tumor grown in the right thigh of C3H mice. The length of mitotic delay of RIF-1 cells, in vivo, was determined after various single doses of x radiation. A direct (exponential) relationship betwen x-ray dose and mitotic delay time was observed. Times of release of the RIF-1 cells from radiation-induced mitotic delay were used to determine the optimum time intervals to deliver the decreasing-sized dose fractions. Six thousand rads administered as decreasing-sized dose fractions resulted in significantly greater RIF-1 tumor control, as compared to conventional radiation therapy. The best treatment schedule, overall, was decreasing-sized dose fractions plus hyperthermia

  1. A Model-Driven Co-Design Framework for Fusing Control and Scheduling Viewpoints.

    Science.gov (United States)

    Sundharam, Sakthivel Manikandan; Navet, Nicolas; Altmeyer, Sebastian; Havet, Lionel

    2018-02-20

    Model-Driven Engineering (MDE) is widely applied in the industry to develop new software functions and integrate them into the existing run-time environment of a Cyber-Physical System (CPS). The design of a software component involves designers from various viewpoints such as control theory, software engineering, safety, etc. In practice, while a designer from one discipline focuses on the core aspects of his field (for instance, a control engineer concentrates on designing a stable controller), he neglects or considers less importantly the other engineering aspects (for instance, real-time software engineering or energy efficiency). This may cause some of the functional and non-functional requirements not to be met satisfactorily. In this work, we present a co-design framework based on timing tolerance contract to address such design gaps between control and real-time software engineering. The framework consists of three steps: controller design, verified by jitter margin analysis along with co-simulation, software design verified by a novel schedulability analysis, and the run-time verification by monitoring the execution of the models on target. This framework builds on CPAL (Cyber-Physical Action Language), an MDE design environment based on model-interpretation, which enforces a timing-realistic behavior in simulation through timing and scheduling annotations. The application of our framework is exemplified in the design of an automotive cruise control system.

  2. A Model-Driven Co-Design Framework for Fusing Control and Scheduling Viewpoints

    Science.gov (United States)

    Navet, Nicolas; Havet, Lionel

    2018-01-01

    Model-Driven Engineering (MDE) is widely applied in the industry to develop new software functions and integrate them into the existing run-time environment of a Cyber-Physical System (CPS). The design of a software component involves designers from various viewpoints such as control theory, software engineering, safety, etc. In practice, while a designer from one discipline focuses on the core aspects of his field (for instance, a control engineer concentrates on designing a stable controller), he neglects or considers less importantly the other engineering aspects (for instance, real-time software engineering or energy efficiency). This may cause some of the functional and non-functional requirements not to be met satisfactorily. In this work, we present a co-design framework based on timing tolerance contract to address such design gaps between control and real-time software engineering. The framework consists of three steps: controller design, verified by jitter margin analysis along with co-simulation, software design verified by a novel schedulability analysis, and the run-time verification by monitoring the execution of the models on target. This framework builds on CPAL (Cyber-Physical Action Language), an MDE design environment based on model-interpretation, which enforces a timing-realistic behavior in simulation through timing and scheduling annotations. The application of our framework is exemplified in the design of an automotive cruise control system. PMID:29461489

  3. A Model-Driven Co-Design Framework for Fusing Control and Scheduling Viewpoints

    Directory of Open Access Journals (Sweden)

    Sakthivel Manikandan Sundharam

    2018-02-01

    Full Text Available Model-Driven Engineering (MDE is widely applied in the industry to develop new software functions and integrate them into the existing run-time environment of a Cyber-Physical System (CPS. The design of a software component involves designers from various viewpoints such as control theory, software engineering, safety, etc. In practice, while a designer from one discipline focuses on the core aspects of his field (for instance, a control engineer concentrates on designing a stable controller, he neglects or considers less importantly the other engineering aspects (for instance, real-time software engineering or energy efficiency. This may cause some of the functional and non-functional requirements not to be met satisfactorily. In this work, we present a co-design framework based on timing tolerance contract to address such design gaps between control and real-time software engineering. The framework consists of three steps: controller design, verified by jitter margin analysis along with co-simulation, software design verified by a novel schedulability analysis, and the run-time verification by monitoring the execution of the models on target. This framework builds on CPAL (Cyber-Physical Action Language, an MDE design environment based on model-interpretation, which enforces a timing-realistic behavior in simulation through timing and scheduling annotations. The application of our framework is exemplified in the design of an automotive cruise control system.

  4. Lower inhibitory control interacts with greater pain catastrophizing to predict greater pain intensity in women with migraine and overweight/obesity.

    Science.gov (United States)

    Galioto, Rachel; O'Leary, Kevin C; Thomas, J Graham; Demos, Kathryn; Lipton, Richard B; Gunstad, John; Pavlović, Jelena M; Roth, Julie; Rathier, Lucille; Bond, Dale S

    2017-12-01

    Pain catastrophizing (PC) is associated with more severe and disabling migraine attacks. However, factors that moderate this relationship are unknown. Failure of inhibitory control (IC), or the ability to suppress automatic or inappropriate responses, may be one such factor given previous research showing a relationship between higher PC and lower IC in non-migraine samples, and research showing reduced IC in migraine. Therefore, we examined whether lower IC interacts with increased PC to predict greater migraine severity as measured by pain intensity, attack frequency, and duration. Women (n = 105) aged 18-50 years old (M = 38.0 ± 1.2) with overweight/obesity and migraine who were seeking behavioral treatment for weight loss and migraine reduction completed a 28-day smartphone-based headache diary assessing migraine headache severity. Participants then completed a modified computerized Stroop task as a measure of IC and self-report measures of PC (Pain Catastrophizing Scale [PCS]), anxiety, and depression. Linear regression was used to examine independent and joint associations of PC and IC with indices of migraine severity after controlling for age, body mass index (BMI) depression, and anxiety. Participants on average had BMI of 35.1 ± 6.5 kg/m 2 and reported 5.3 ± 2.6 migraine attacks (8.3 ± 4.4 migraine days) over 28 days that produced moderate pain intensity (5.9 ± 1.4 out of 10) with duration of 20.0 ± 14.2 h. After adjusting for covariates, higher PCS total (β = .241, SE = .14, p = .03) and magnification subscale (β = .311, SE = .51, p migraine attacks. Future studies are needed to determine whether interventions to improve IC could lead to less painful migraine attacks via improvements in PC.

  5. Day-Ahead Scheduling Considering Demand Response as a Frequency Control Resource

    Directory of Open Access Journals (Sweden)

    Yu-Qing Bao

    2017-01-01

    Full Text Available The development of advanced metering technologies makes demand response (DR able to provide fast response services, e.g., primary frequency control. It is recognized that DR can contribute to the primary frequency control like thermal generators. This paper proposes a day-ahead scheduling method that considers DR as a frequency control resource, so that the DR resources can be dispatched properly with other resources. In the proposed method, the objective of frequency control is realized by defining a frequency limit equation under a supposed contingency. The frequency response model is used to model the dynamics of system frequency. The nonlinear frequency limit equation is transformed to a linear arithmetic equation by piecewise linearization, so that the problem can be solved by mixed integer linear programming (MILP. Finally, the proposed method is verified on numerical examples.

  6. A Novel Energy Efficient Topology Control Scheme Based on a Coverage-Preserving and Sleep Scheduling Model for Sensor Networks

    OpenAIRE

    Shi, Binbin; Wei, Wei; Wang, Yihuai; Shu, Wanneng

    2016-01-01

    In high-density sensor networks, scheduling some sensor nodes to be in the sleep mode while other sensor nodes remain active for monitoring or forwarding packets is an effective control scheme to conserve energy. In this paper, a Coverage-Preserving Control Scheduling Scheme (CPCSS) based on a cloud model and redundancy degree in sensor networks is proposed. Firstly, the normal cloud model is adopted for calculating the similarity degree between the sensor nodes in terms of their historical d...

  7. The Biology and Control of the Greater Wax Moth, Galleria mellonella.

    Science.gov (United States)

    Kwadha, Charles A; Ong'amo, George O; Ndegwa, Paul N; Raina, Suresh K; Fombong, Ayuka T

    2017-06-09

    The greater wax moth, Galleria mellonella Linnaeus , is a ubiquitous pest of the honeybee, Apis mellifera Linnaeus, and Apis cerana Fabricius . The greater wax moth larvae burrow into the edge of unsealed cells with pollen, bee brood, and honey through to the midrib of honeybee comb. Burrowing larvae leave behind masses of webs which causes galleriasis and later absconding of colonies. The damage caused by G. mellonella larvae is severe in tropical and sub-tropical regions, and is believed to be one of the contributing factors to the decline in both feral and wild honeybee populations. Previously, the pest was considered a nuisance in honeybee colonies, therefore, most studies have focused on the pest as a model for in vivo studies of toxicology and pathogenicity. It is currently widespread, especially in Africa, and the potential of transmitting honeybee viruses has raised legitimate concern, thus, there is need for more studies to find sustainable integrated management strategies. However, our knowledge of this pest is limited. This review provides an overview of the current knowledge on the biology, distribution, economic damage, and management options. In addition, we provide prospects that need consideration for better understanding and management of the pest.

  8. Double- and Triple-Duty Caregiving Men: An Examination of Subjective Stress and Perceived Schedule Control.

    Science.gov (United States)

    DePasquale, Nicole; Zarit, Steven H; Mogle, Jacqueline; Moen, Phyllis; Hammer, Leslie B; Almeida, David M

    2018-04-01

    Based on the stress process model of family caregiving, this study examined subjective stress appraisals and perceived schedule control among men employed in the long-term care industry (workplace-only caregivers) who concurrently occupied unpaid family caregiving roles for children (double-duty child caregivers), older adults (double-duty elder caregivers), and both children and older adults (triple-duty caregivers). Survey responses from 123 men working in nursing home facilities in the United States were analyzed using multiple linear regression models. Results indicated that workplace-only and double- and triple-duty caregivers' appraised primary stress similarly. However, several differences emerged with respect to secondary role strains, specifically work-family conflict, emotional exhaustion, and turnover intentions. Schedule control also constituted a stress buffer for double- and triple-duty caregivers, particularly among double-duty elder caregivers. These findings contribute to the scarce literature on double- and triple-duty caregiving men and have practical implications for recruitment and retention strategies in the health care industry.

  9. Frequency domain design of gain scheduling control for large wind systems in full-load region

    International Nuclear Information System (INIS)

    Burlibaşa, A.; Ceangă, E.

    2014-01-01

    Highlights: • A large wind energy system, operating under full-load regime, is considered. • According to its particularities in frequency domain, control law design is provided. • These particularities are influenced by the interactions of wind–tower–blade ensemble. • Control low, within gain scheduling strategy, is achieved imposing stability reserve. • Supplementary a criterion, aimed at reducing mechanical loads, is imposed. - Abstract: The paper presents the issue of power control law synthesis, in the case of a large wind system that operates under full-load regime, based on dynamic properties details in frequency domain. Solving this problem involves two phases: the establishment of a linearized model as faithfully as possible in various operating points of the full-load region, and synthesis of the power controller, considered with classic structure, taking into account frequency particularities of the obtained linearized model. Obtained linear model of the controlled process is of order 16 and encloses subsystems for tower fore-aft oscillations damping, and for drive-train torsion oscillations damping. The designed controller contains a PI component and a lag compensator for dynamic correction at high frequencies. It is known that the main features of wind system dynamics generated by the interaction of wind–tower–blade ensemble cause a gap in the gain characteristic of the model and complex conjugate zeros, which can move between right and left half-planes, depending on the average wind speed value. Consequently, for control law synthesis an interactive frequency solution is adopted. This is “transparent” in relation to particularities induced by wind–tower–blade interaction. This solution allows evaluation of the extent to which control law is affected by the subsystem for tower oscillations damping. Given the strong dependence between the model and the mean wind speed value, a gain scheduling control law is designed. At

  10. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  11. The Swift Project Contamination Control Program: A Case Study of Balancing Cost, Schedule and Risk

    Science.gov (United States)

    Hansen, Patricia A.; Day, Diane T.; Secunda, Mark S.; Rosecrans, Glenn P.

    2004-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  12. Scheduled power tracking control of the wind-storage hybrid system based on the reinforcement learning theory

    Science.gov (United States)

    Li, Ze

    2017-09-01

    In allusion to the intermittency and uncertainty of the wind electricity, energy storage and wind generator are combined into a hybrid system to improve the controllability of the output power. A scheduled power tracking control method is proposed based on the reinforcement learning theory and Q-learning algorithm. In this method, the state space of the environment is formed with two key factors, i.e. the state of charge of the energy storage and the difference value between the actual wind power and scheduled power, the feasible action is the output power of the energy storage, and the corresponding immediate rewarding function is designed to reflect the rationality of the control action. By interacting with the environment and learning from the immediate reward, the optimal control strategy is gradually formed. After that, it could be applied to the scheduled power tracking control of the hybrid system. Finally, the rationality and validity of the method are verified through simulation examples.

  13. Quantized Synchronization of Chaotic Neural Networks With Scheduled Output Feedback Control.

    Science.gov (United States)

    Wan, Ying; Cao, Jinde; Wen, Guanghui

    In this paper, the synchronization problem of master-slave chaotic neural networks with remote sensors, quantization process, and communication time delays is investigated. The information communication channel between the master chaotic neural network and slave chaotic neural network consists of several remote sensors, with each sensor able to access only partial knowledge of output information of the master neural network. At each sampling instants, each sensor updates its own measurement and only one sensor is scheduled to transmit its latest information to the controller's side in order to update the control inputs for the slave neural network. Thus, such communication process and control strategy are much more energy-saving comparing with the traditional point-to-point scheme. Sufficient conditions for output feedback control gain matrix, allowable length of sampling intervals, and upper bound of network-induced delays are derived to ensure the quantized synchronization of master-slave chaotic neural networks. Lastly, Chua's circuit system and 4-D Hopfield neural network are simulated to validate the effectiveness of the main results.In this paper, the synchronization problem of master-slave chaotic neural networks with remote sensors, quantization process, and communication time delays is investigated. The information communication channel between the master chaotic neural network and slave chaotic neural network consists of several remote sensors, with each sensor able to access only partial knowledge of output information of the master neural network. At each sampling instants, each sensor updates its own measurement and only one sensor is scheduled to transmit its latest information to the controller's side in order to update the control inputs for the slave neural network. Thus, such communication process and control strategy are much more energy-saving comparing with the traditional point-to-point scheme. Sufficient conditions for output feedback control

  14. WGC Based Robust and Gain Scheduling PI Controller Design for Condensing Boilers

    Directory of Open Access Journals (Sweden)

    Cem Onat

    2014-05-01

    Full Text Available This paper addresses the water temperature PI control in condensing domestic boilers. The main challenge of this process under the controller design perspective is the fact that the dynamics of condensing boilers are strongly affected by the demanded water flow rate. First, a robust PI controller based on weighted geometrical center method is designed that stabilizes and achieves good performance for closed-loop system for a wide range of the water flow rate. Then, it is shown that if the water flow rate information is used to update the controller gains, through a technique known as gain scheduled control, the performance can be significantly improved. Important characteristics of these PI design approaches are that the resulting parameters are calculated numerically without using any graphical method or iterative optimization process and that it guarantees the stability of the closed-loop. Significantly, simulation results have demonstrated that the proposed tuning techniques can perform better for set point changes and load disturbance than other available methods in the literature.

  15. Hybrid Control System for Greater Resilience Using Multiple Isolation and Building Connection

    Directory of Open Access Journals (Sweden)

    Masaki Taniguchi

    2016-10-01

    Full Text Available An innovative hybrid control building system of multiple isolation and connection is proposed and investigated using both time-history and input energy responses for various types of ground motions together with transfer functions. It is concerned that the seismic displacement response at the base-isolation layer of the existing base-isolated buildings may extremely increase under long-period and long-duration ground motions which are getting great attention recently. In order to enhance the seismic performance of those base-isolated buildings, a novel hybrid system of multiple isolation and building-connection is proposed and compared with other structural systems such as an independent multiple isolation system, a hybrid system of base-isolation and building-connection. Furthermore, the robustness of seismic responses of the proposed hybrid system for various types of ground motion is discussed through the comparison of various structural systems including non-hybrid systems. Finally the optimal connection damper location is investigated using a sensitivity-type optimization approach.

  16. A Novel Algorithm of Quantum Random Walk in Server Traffic Control and Task Scheduling

    Directory of Open Access Journals (Sweden)

    Dong Yumin

    2014-01-01

    Full Text Available A quantum random walk optimization model and algorithm in network cluster server traffic control and task scheduling is proposed. In order to solve the problem of server load balancing, we research and discuss the distribution theory of energy field in quantum mechanics and apply it to data clustering. We introduce the method of random walk and illuminate what the quantum random walk is. Here, we mainly research the standard model of one-dimensional quantum random walk. For the data clustering problem of high dimensional space, we can decompose one m-dimensional quantum random walk into m one-dimensional quantum random walk. In the end of the paper, we compare the quantum random walk optimization method with GA (genetic algorithm, ACO (ant colony optimization, and SAA (simulated annealing algorithm. In the same time, we prove its validity and rationality by the experiment of analog and simulation.

  17. Analysis of critical paths for schedule control of nuclear power projects

    International Nuclear Information System (INIS)

    Shi Liangmin; Ma Limin; Fan Kai

    2005-01-01

    Study on the critical paths for the schedule control of nuclear power projects has been performed for reactor M310, based on the experiences from Daya Bay project and Ling Ao project. The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test. For NI civil work, the critical path is the main civil work of the reactor building, pre-stressing, handover of rooms for important areas, and key CW-erection interfaces; there are four critical paths for NI erection; For startup, two stages can be identified: commissioning of 16 single systems directly serving the CFT and joint-test. (authors)

  18. Almost output regulation of LFT systems via gain-scheduling control

    Science.gov (United States)

    Yuan, Chengzhi; Duan, Chang; Wu, Fen

    2018-05-01

    Output regulation of general uncertain systems is a meaningful yet challenging problem. In spite of the rich literature in the field, the problem has not yet been addressed adequately due to the lack of an effective design mechanism. In this paper, we propose a new design framework for almost output regulation of uncertain systems described in the general form of linear fractional transformation (LFT) with time-varying parametric uncertainties and unknown external perturbations. A novel semi-LFT gain-scheduling output regulator structure is proposed, such that the associated control synthesis conditions guaranteeing both output regulation and ? disturbance attenuation performance are formulated as a set of linear matrix inequalities (LMIs) plus parameter-dependent linear matrix equations, which can be solved separately. A numerical example has been used to demonstrate the effectiveness of the proposed approach.

  19. Energy-Efficient Scheduling for Hybrid Tasks in Control Devices for the Internet of Things

    Science.gov (United States)

    Gao, Zhigang; Wu, Yifan; Dai, Guojun; Xia, Haixia

    2012-01-01

    In control devices for the Internet of Things (IoT), energy is one of the critical restriction factors. Dynamic voltage scaling (DVS) has been proved to be an effective method for reducing the energy consumption of processors. This paper proposes an energy-efficient scheduling algorithm for IoT control devices with hard real-time control tasks (HRCTs) and soft real-time tasks (SRTs). The main contribution of this paper includes two parts. First, it builds the Hybrid tasks with multi-subtasks of different function Weight (HoW) task model for IoT control devices. HoW describes the structure of HRCTs and SRTs, and their properties, e.g., deadlines, execution time, preemption properties, and energy-saving goals, etc. Second, it presents the Hybrid Tasks' Dynamic Voltage Scaling (HTDVS) algorithm. HTDVS first sets the slowdown factors of subtasks while meeting the different real-time requirements of HRCTs and SRTs, and then dynamically reclaims, reserves, and reuses the slack time of the subtasks to meet their ideal energy-saving goals. Experimental results show HTDVS can reduce energy consumption about 10%–80% while meeting the real-time requirements of HRCTs, HRCTs help to reduce the deadline miss ratio (DMR) of systems, and HTDVS has comparable performance with the greedy algorithm and is more favorable to keep the subtasks' ideal speeds. PMID:23112659

  20. Energy-Efficient Scheduling for Hybrid Tasks in Control Devices for the Internet of Things

    Directory of Open Access Journals (Sweden)

    Guojun Dai

    2012-08-01

    Full Text Available In control devices for the Internet of Things (IoT, energy is one of the critical restriction factors. Dynamic voltage scaling (DVS has been proved to be an effective method for reducing the energy consumption of processors. This paper proposes an energy-efficient scheduling algorithm for IoT control devices with hard real-time control tasks (HRCTs and soft real-time tasks (SRTs. The main contribution of this paper includes two parts. First, it builds the Hybrid tasks with multi-subtasks of different function Weight (HoW task model for IoT control devices. HoW describes the structure of HRCTs and SRTs, and their properties, e.g., deadlines, execution time, preemption properties, and energy-saving goals, etc. Second, it presents the Hybrid Tasks’ Dynamic Voltage Scaling (HTDVS algorithm. HTDVS first sets the slowdown factors of subtasks while meeting the different real-time requirements of HRCTs and SRTs, and then dynamically reclaims, reserves, and reuses the slack time of the subtasks to meet their ideal energy-saving goals. Experimental results show HTDVS can reduce energy consumption about 10%–80% while meeting the real-time requirements of HRCTs, HRCTs help to reduce the deadline miss ratio (DMR of systems, and HTDVS has comparable performance with the greedy algorithm and is more favorable to keep the subtasks’ ideal speeds.

  1. Dynamical Scheduling and Robust Control in Uncertain Environments with Petri Nets for DESs

    Directory of Open Access Journals (Sweden)

    Dimitri Lefebvre

    2017-10-01

    Full Text Available This paper is about the incremental computation of control sequences for discrete event systems in uncertain environments where uncontrollable events may occur. Timed Petri nets are used for this purpose. The aim is to drive the marking of the net from an initial value to a reference one, in minimal or near-minimal time, by avoiding forbidden markings, deadlocks, and dead branches. The approach is similar to model predictive control with a finite set of control actions. At each step only a small area of the reachability graph is explored: this leads to a reasonable computational complexity. The robustness of the resulting trajectory is also evaluated according to a risk probability. A sufficient condition is provided to compute robust trajectories. The proposed results are applicable to a large class of discrete event systems, in particular in the domains of flexible manufacturing. However, they are also applicable to other domains as communication, computer science, transportation, and traffic as long as the considered systems admit Petri Nets (PNs models. They are suitable for dynamical deadlock-free scheduling and reconfiguration problems in uncertain environments.

  2. Model predictive control-based scheduler for repetitive discrete event systems with capacity constraints

    Directory of Open Access Journals (Sweden)

    Hiroyuki Goto

    2013-07-01

    Full Text Available A model predictive control-based scheduler for a class of discrete event systems is designed and developed. We focus on repetitive, multiple-input, multiple-output, and directed acyclic graph structured systems on which capacity constraints can be imposed. The target system’s behaviour is described by linear equations in max-plus algebra, referred to as state-space representation. Assuming that the system’s performance can be improved by paying additional cost, we adjust the system parameters and determine control inputs for which the reference output signals can be observed. The main contribution of this research is twofold, 1: For systems with capacity constraints, we derived an output prediction equation as functions of adjustable variables in a recursive form, 2: Regarding the construct for the system’s representation, we improved the structure to accomplish general operations which are essential for adjusting the system parameters. The result of numerical simulation in a later section demonstrates the effectiveness of the developed controller.

  3. Spillways Scheduling for Flood Control of Three Gorges Reservoir Using Mixed Integer Linear Programming Model

    Directory of Open Access Journals (Sweden)

    Maoyuan Feng

    2014-01-01

    Full Text Available This study proposes a mixed integer linear programming (MILP model to optimize the spillways scheduling for reservoir flood control. Unlike the conventional reservoir operation model, the proposed MILP model specifies the spillways status (including the number of spillways to be open and the degree of the spillway opened instead of reservoir release, since the release is actually controlled by using the spillway. The piecewise linear approximation is used to formulate the relationship between the reservoir storage and water release for a spillway, which should be open/closed with a status depicted by a binary variable. The control order and symmetry rules of spillways are described and incorporated into the constraints for meeting the practical demand. Thus, a MILP model is set up to minimize the maximum reservoir storage. The General Algebraic Modeling System (GAMS and IBM ILOG CPLEX Optimization Studio (CPLEX software are used to find the optimal solution for the proposed MILP model. The China’s Three Gorges Reservoir, whose spillways are of five types with the total number of 80, is selected as the case study. It is shown that the proposed model decreases the flood risk compared with the conventional operation and makes the operation more practical by specifying the spillways status directly.

  4. Multi-Time Scale Coordinated Scheduling Strategy with Distributed Power Flow Controllers for Minimizing Wind Power Spillage

    Directory of Open Access Journals (Sweden)

    Yi Tang

    2017-11-01

    Full Text Available The inherent variability and randomness of large-scale wind power integration have brought great challenges to power flow control and dispatch. The distributed power flow controller (DPFC has the higher flexibility and capacity in power flow control in the system with wind generation. This paper proposes a multi-time scale coordinated scheduling model with DPFC to minimize wind power spillage. Configuration of DPFCs is initially determined by stochastic method. Afterward, two sequential procedures containing day-head and real-time scales are applied for determining maximum schedulable wind sources, optimal outputs of generating units and operation setting of DPFCs. The generating plan is obtained initially in day-ahead scheduling stage and modified in real-time scheduling model, while considering the uncertainty of wind power and fast operation of DPFC. Numerical simulation results in IEEE-RTS79 system illustrate that wind power is maximum scheduled with the optimal deployment and operation of DPFC, which confirms the applicability and effectiveness of the proposed method.

  5. Effects of gain-scheduling methods in a classical wind turbine controller on wind turbine aeroservoelastic modes and loads

    DEFF Research Database (Denmark)

    Tibaldi, Carlo; Henriksen, Lars Christian; Hansen, Morten Hartvig

    2014-01-01

    The eects of dierent gain-scheduling methods for a classical wind turbine controller, operating in full load region, on the wind turbine aeroservoelastic modes and loads are investigated in this work. The dierent techniques are derived looking at the physical problem to take into account the chan......The eects of dierent gain-scheduling methods for a classical wind turbine controller, operating in full load region, on the wind turbine aeroservoelastic modes and loads are investigated in this work. The dierent techniques are derived looking at the physical problem to take into account...

  6. Nonlinear model-based control of the Czochralski process III: Proper choice of manipulated variables and controller parameter scheduling

    Science.gov (United States)

    Neubert, M.; Winkler, J.

    2012-12-01

    This contribution continues an article series [1,2] about the nonlinear model-based control of the Czochralski crystal growth process. The key idea of the presented approach is to use a sophisticated combination of nonlinear model-based and conventional (linear) PI controllers for tracking of both, crystal radius and growth rate. Using heater power and pulling speed as manipulated variables several controller structures are possible. The present part tries to systematize the properties of the materials to be grown in order to get unambiguous decision criteria for a most profitable choice of the controller structure. For this purpose a material specific constant M called interface mobility and a more process specific constant S called system response number are introduced. While the first one summarizes important material properties like thermal conductivity and latent heat the latter one characterizes the process by evaluating the average axial thermal gradients at the phase boundary and the actual growth rate at which the crystal is grown. Furthermore these characteristic numbers are useful for establishing a scheduling strategy for the PI controller parameters in order to improve the controller performance. Finally, both numbers give a better understanding of the general thermal system dynamics of the Czochralski technique.

  7. Randomized controlled trial of RTS,S/AS02D and RTS,S/AS01E malaria candidate vaccines given according to different schedules in Ghanaian children.

    Directory of Open Access Journals (Sweden)

    Seth Owusu-Agyei

    2009-10-01

    Full Text Available The target delivery channel of RTS,S candidate malaria vaccines in malaria-endemic countries in Africa is the World Health Organisation Expanded Program on Immunization. As an Adjuvant System, age de-escalation and schedule selection step, this study assessed 3 schedules of RTS,S/AS01(E and RTS,S/AS02(D in infants and young children 5-17 months of age in Ghana.A Phase II, partially-blind randomized controlled study (blind to vaccine, not to schedule, of 19 months duration was conducted in two (2 centres in Ghana between August 2006 and May 2008. Subjects were allocated randomly (1:1:1:1:1:1 to one of six study groups at each study site, each defining which vaccine should be given and by which schedule (0,1-, 0,1,2- or 0,1,7-months. For the 0,1,2-month schedule participants received RTS,S/AS01(E or rabies vaccine at one center and RTS,S/AS01(E or RTS,S/AS02(D at the other. For the other schedules at both study sites, they received RTS,S/AS01(E or RTS,S/AS02(D. The primary outcome measure was the occurrence of serious adverse events until 10 months post dose 1.The number of serious adverse events reported across groups was balanced. One child had a simple febrile convulsion, which evolved favourably without sequelae, considered to be related to RTS,S/AS01(E vaccination. Low grade reactions occurred slightly more frequently in recipients of RTS,S/AS than rabies vaccines; grade 3 reactions were infrequent. Less local reactogenicity occurred with RTS,S/AS01(E than RTS,S/AS02(D. Both candidate vaccines were highly immunogenic for anti-circumsporozoite and anti-Hepatitis B Virus surface antigen antibodies. Recipients of RTS,S/AS01(E compared to RTS,S/AS02(D had higher peak anti-circumsporozoite antibody responses for all 3 schedules. Three dose schedules were more immunogenic than 2 dose schedules. Area under the curve analyses for anti-circumsporozoite antibodies were comparable between the 0,1,2- and 0,1,7-month RTS,S/AS01(E schedules.Both candidate

  8. Classification of two steroids, prostanozol and methasterone, as Schedule III anabolic steroids under the Controlled Substance Act. Final rule.

    Science.gov (United States)

    2012-07-30

    With the issuance of this Final Rule, the Administrator of the DEA classifies the following two steroids as "anabolic steroids'' under the Controlled Substances Act (CSA): prostanozol (17[beta]-hydroxy-5[alpha]-androstano[3,2-c]pyrazole) and methasterone (2[alpha],17[alpha]-dimethyl-5[alpha]-androstan-17[beta]-ol-3-one). These steroids and their salts, esters, and ethers are Schedule III controlled substances subject to the regulatory control provisions of the CSA.

  9. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  10. Multi-Agent Based Beam Search for Real-Time Production Scheduling and Control Method, Software and Industrial Application

    CERN Document Server

    Kang, Shu Gang

    2013-01-01

    The Multi-Agent Based Beam Search (MABBS) method systematically integrates four major requirements of manufacturing production - representation capability, solution quality, computation efficiency, and implementation difficulty - within a unified framework to deal with the many challenges of complex real-world production planning and scheduling problems. Multi-agent Based Beam Search for Real-time Production Scheduling and Control introduces this method, together with its software implementation and industrial applications.  This book connects academic research with industrial practice, and develops a practical solution to production planning and scheduling problems. To simplify implementation, a reusable software platform is developed to build the MABBS method into a generic computation engine.  This engine is integrated with a script language, called the Embedded Extensible Application Script Language (EXASL), to provide a flexible and straightforward approach to representing complex real-world problems. ...

  11. 78 FR 21858 - Schedules of Controlled Substances: Temporary Placement of Three Synthetic Cannabinoids Into...

    Science.gov (United States)

    2013-04-12

    ...), FDA acts as the lead agency within HHS in carrying out the Secretary's scheduling responsibilities... mixtures of these substances for the purpose of achieving intoxication has been identified as a reason for...

  12. 78 FR 28735 - Schedules of Controlled Substances: Temporary Placement of Three Synthetic Cannabinoids Into...

    Science.gov (United States)

    2013-05-16

    ... Abuse (NIDA), FDA acts as the lead agency within HHS in carrying out the Secretary's scheduling... of these substances for the purpose of achieving intoxication has been identified as a reason for...

  13. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms

    Directory of Open Access Journals (Sweden)

    Youngsoo Jung

    2015-01-01

    Full Text Available As the owners expect that the cost and time for nuclear power plant construction would decrease with new entrants into the market, there will be severer competition in the nuclear industry. In order to achieve performance improvement and to attain competitive advantages under the globalized competition, practitioners and researchers in the nuclear industry have recently exerted efforts to develop an advanced and efficient management methodology for the nuclear mega-projects. Among several candidates, integrated cost and schedule control system is of great concern because it can effectively manage the three most important project performances including cost, time, and quality. In this context, the purpose of this paper is to develop a project numbering system (PNS of integrated cost and schedule control system for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first in order to identify influencing variables that characterize real-world implementation of advanced cost and schedule controls. A scenario was then developed and analysed to simulate a case-project. By using this case-project, proposed management requirements, management methods, measurement techniques, data structure, and data collection methods for integrated cost and schedule PNS were illustrated. Finally, findings and implications are outlined, and recommendations for further research are presented.

  14. Concurrent progressive-ratio schedules: built-in controls in the study of delayed reward efficacy.

    Science.gov (United States)

    Jarmolowicz, David P; Hudnall, Jennifer L

    2014-08-15

    Delayed rewards maintain lower rates of operant responding than immediate rewards, and when given a choice between immediate and delayed rewards, individuals typically choose the immediate reward, even when it is smaller (a phenomenon called delay discounting). The behavioral and neural mechanisms underlying these behavioral patterns, however, are not conclusively understood. The present study developed a method to examine the efficacy of delayed rewards in a way that is suitable for pharmacological manipulation of delayed reward efficacy (while controlling for general changes in reward efficacy). The progressive ratio (PR) paradigm often used to examine reward efficacy was modified such that two PR schedules for lever pressing concurrently yet independently were presented. Across a series of conditions, a range of delays (3-81s) were arranged on one of the levers while the reward on the other lever remained immediate. PR breakpoints (the highest ratio completed on each lever, our measure of reward efficacy) systematically decreased on the delayed, but not on the immediate reward lever, suggesting that delays decreased reward efficacy. This decrease in breakpoint resulted in bias in within-session responding that was accounted for by models that adjusted reward value by the delay to that reward. Unlike the standard PR paradigm, the present arrangement provided the controls needed to differentiate delay specific from general changes in reward efficacy. The present method should be helpful in the study of the behavioral and neural mechanisms of delayed reward efficacy. Modifications of the present paradigm should be useful for pharmacological studies. Copyright © 2014 Elsevier B.V. All rights reserved.

  15. Social information-processing and coping in adolescent females diagnosed with an eating disorder: toward a greater understanding of control.

    Science.gov (United States)

    McFillin, Roger K; Cahn, Stacey C; Burks, Virginia Salzer; Levine, Martha Peaslee; Loney, Susan Lane; Levine, Richard L

    2012-01-01

    The objective of this study was to examine differences in social information-processing and coping strategies between adolescent females in treatment for an eating disorder and asymptomatic peers. Adolescent females in treatment for an eating disorder (n = 50) were compared to asymptomatic control participants (n = 59) on a measure of social information-processing. Participants were presented with 4 hypothetical, ambiguous social dilemmas in which the intent of a peer provocateur was unclear. Questions followed each dilemma assessing intent attributions, the participant's emotional reaction, the intensity of the emotion, and coping strategies. The participants in treatment for an eating disorder were significantly more likely to perceive hostile intent from a peer provocateur, reported a greater intensity of negative emotions, and identified a significantly greater number of avoidant coping strategies. Specifically, the eating disorder group identified significantly more intrapunitive avoidant coping strategies that reflect maladaptive and self-destructive means of coping with distressing events. Results indicate social cognitive processing biases and maladaptive coping strategies may be instrumental in perceived loss of control and influence the development/maintenance of eating disorders.

  16. Tools and techniques for schedule's controlling: tracking system and control of Urucu-Manaus gas-pipeline construction, stretch B1

    Energy Technology Data Exchange (ETDEWEB)

    Zuany, Valdenise Marques; Dias, Jose Luiz Gomes [CONCREMAT Engenharia e Tecnologia S/A, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The goal is to show the monitoring systems and deadline control, using the PMBOK{sup R} project management tools, in the Construction and Assembly of the Coari-Manaus Gas-pipeline, stretch B1, which includes the cities of Coari, Codajas, Anori and Anama, in the state of Amazon, in the Northern Undertaking Implementation (IENOR), an Engineering division of the PETROBRAS System. This report presents the practical effects of the usage of three schedule control tools of the project: Performance Measurement, using the technique of the Earned Value Management (EVM), which integrates cost, schedule and physical progress of the enterprise to determine the variations of schedule and performance; Project Management Software, MSProject, which allows schedule's elaboration and makes the tracking of the planned dates possible (baseline) in relation to real dates and forecasts the trend level, the effects of changes in the project's schedule, demonstrating its utility as a schedule control tool; and Schedule Variance Analysis, which adopts practical data to reach the pessimistic, most likely and optimistic expectations. The implantation of these tools was based in the Work Breakdown Structure of the enterprise. The application of these three tools in the tracking and control of the enterprise demonstrates that, the use of information and techniques deriving from the planning and control can be an important support for project management and decision taking, comparing the results gotten in the implantation of the plan with its actual realization, defining, thus, the necessary corrective actions, generating learned lessons to use in future projects. (author)

  17. Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

    Science.gov (United States)

    Richards, Stephen F.

    1992-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

  18. Optimal Real-Time Scheduling for Hybrid Energy Storage Systems and Wind Farms Based on Model Predictive Control

    Directory of Open Access Journals (Sweden)

    Meng Xiong

    2015-08-01

    Full Text Available Energy storage devices are expected to be more frequently implemented in wind farms in near future. In this paper, both pumped hydro and fly wheel storage systems are used to assist a wind farm to smooth the power fluctuations. Due to the significant difference in the response speeds of the two storages types, the wind farm coordination with two types of energy storage is a problem. This paper presents two methods for the coordination problem: a two-level hierarchical model predictive control (MPC method and a single-level MPC method. In the single-level MPC method, only one MPC controller coordinates the wind farm and the two storage systems to follow the grid scheduling. Alternatively, in the two-level MPC method, two MPC controllers are used to coordinate the wind farm and the two storage systems. The structure of two level MPC consists of outer level and inner level MPC. They run alternatively to perform real-time scheduling and then stop, thus obtaining long-term scheduling results and sending some results to the inner level as input. The single-level MPC method performs both long- and short-term scheduling tasks in each interval. The simulation results show that the methods proposed can improve the utilization of wind power and reduce wind power spillage. In addition, the single-level MPC and the two-level MPC are not interchangeable. The single-level MPC has the advantage of following the grid schedule while the two-level MPC can reduce the optimization time by 60%.

  19. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  20. Greater anterior insula activation during anticipation of food images in women recovered from anorexia nervosa versus controls

    Science.gov (United States)

    Oberndorfer, Tyson; Simmons, Alan; McCurdy, Danyale; Strigo, Irina; Matthews, Scott; Yang, Tony; Irvine, Zoe; Kaye, Walter

    2013-01-01

    Individuals with anorexia nervosa (AN) restrict food consumption and become severely emaciated. Eating food, even thinking of eating food, is often associated with heightened anxiety. However, food cue anticipation in AN is poorly understood. Fourteen women recovered from AN and 12 matched healthy control women performed an anticipation task viewing images of food and object images during functional magnetic resonance imaging. Comparing anticipation of food versus object images between control women and recovered AN groups showed significant interaction only in the right ventral anterior insula, with greater activation in recovered AN anticipating food images. These data support the hypothesis of a disconnect between anticipating and experiencing food stimuli in recovered AN. Insula activation positively correlated with pleasantness ratings of palatable foods in control women, while no such relationship existed in recovered AN, which is further evidence of altered interoceptive function. Finally, these findings raise the possibility that enhanced anterior insula anticipatory response to food cues in recovered AN could contribute to exaggerated sensitivity and anxiety related to food and eating. PMID:23993362

  1. Simulation of textile manufacturing processes for planning, scheduling, and quality control purposes

    Science.gov (United States)

    Cropper, A. E.; Wang, Z.

    1995-08-01

    Simulation, as a management information tool, has been applied to engineering manufacture and assembly operations. The application of the principles to textile manufacturing (fiber to fabric) is discussed. The particular problems and solutions in applying the simulation software package to the yarn production processes are discussed with an indication of how the software achieves the production schedule. The system appears to have application in planning, scheduling, and quality assurance. The latter being a result of the traceability possibilities through a process involving mixing and splitting of material.

  2. When drugs in the same controlled substance schedule differ in real-world abuse, should they be differentiated in labeling?

    Science.gov (United States)

    Dasgupta, Nabarun; Henningfield, Jack E; Ertischek, Michelle D; Schnoll, Sidney H

    2011-12-01

    The prescription drugs regulated in the most restrictive controlled substance schedule for those with an approved therapeutic use vary widely in their real world risk of abuse and harm. Opioid analgesics have the highest rates of abuse, overdose death, drug abuse treatment needs and societal costs in comparison to other Schedule II drugs. Stimulants for attention-deficit/hyperactivity disorders (ADHD) account for substantially lower rates of abuse, harm, and public health impact. The scheduling of drugs is determined by the World Health Organization, the United States Food and Drug Administration, and other regulatory agencies, through a quasi-public process that relies heavily on pre-marketing studies that are conducted in highly controlled clinical settings. We propose that it is increasingly in the interest of science-based regulation and public health to recognize and communicate differences among drugs based on their real-world abuse and public health harm using surveillance data. Appropriate differentiation through labeling of drugs that will likely remain in the same schedule could provide powerful incentives for drug development and research, would aid prescriber/patient decision making by informing them of real differences across drugs within a schedule, and may also contribute to public health efforts to reduce drug abuse. There are risks of course, that include inadvertent perceptions that drugs labeled to be lower in risk are not taken as seriously as others in the same category. Challenges such as these, however, can be overcome and should not serve as barriers to objective communications regarding a drug's actual risks. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  3. Is compromised oral health associated with a greater risk of mortality among nursing home residents? A controlled clinical study.

    Science.gov (United States)

    Klotz, Anna-Luisa; Hassel, Alexander Jochen; Schröder, Johannes; Rammelsberg, Peter; Zenthöfer, Andreas

    2017-08-30

    The objective of this controlled clinical study was to evaluate the association between oral health and 1-year mortality among nursing home residents with or without oral health intervention. This research was part of a multidisciplinary intervention study (EVI-P) performed in 14 nursing homes in Germany. Two-hundred and nineteen nursing home residents were included in the study and assigned to an intervention group, for which dental health education was offered and ultrasonic baths were used for denture cleaning (n = 144), or to a control group (n = 75). Before the intervention, each participant was examined, and dental status, plaque control record (PCR), Denture Hygiene Index, and results from the Revised Oral Assessment Guide were recorded. Amount of care needed and dementia were also assessed, by use of the Barthel Index and the Mini Mental State Examination, respectively. Participant mortality was determined after 12 months, and bivariate analysis and logistic regression models were used to evaluate possible factors affecting mortality. Bivariate analysis detected a direct association between greater mortality and being in the control group (p = .038). Participants with higher PCR were also more likely to die during the study period (p = .049). For dentate participants, the protective effect of being in the intervention group was confirmed by multivariate analysis in which covariates such as age and gender were considered. Oral hygiene and oral health seem to affect the risk of mortality of nursing home residents. Dental intervention programs seem to reduce the risk of 1-year mortality among nursing home residents having remaining natural teeth. Further studies, with larger sample sizes and evaluation of the causes of death, are necessary to investigate the reasons for these associations.

  4. Anodal transcranial direct current stimulation over the primary motor cortex does not enhance the learning benefits of self-controlled feedback schedules.

    Science.gov (United States)

    Carter, Michael J; Smith, Victoria; Carlsen, Anthony N; Ste-Marie, Diane M

    2018-05-01

    A distinct learning advantage has been shown when participants control their knowledge of results (KR) scheduling during practice compared to when the same KR schedule is imposed on the learner without choice (i.e., yoked schedules). Although the learning advantages of self-controlled KR schedules are well-documented, the brain regions contributing to these advantages remain unknown. Identifying key brain regions would not only advance our theoretical understanding of the mechanisms underlying self-controlled learning advantages, but would also highlight regions that could be targeted in more applied settings to boost the already beneficial effects of self-controlled KR schedules. Here, we investigated whether applying anodal transcranial direct current stimulation (tDCS) to the primary motor cortex (M1) would enhance the typically found benefits of learning a novel motor skill with a self-controlled KR schedule. Participants practiced a spatiotemporal task in one of four groups using a factorial combination of KR schedule (self-controlled vs. yoked) and tDCS (anodal vs. sham). Testing occurred on two consecutive days with spatial and temporal accuracy measured on both days and learning was assessed using 24-h retention and transfer tests without KR. All groups improved their performance in practice and a significant effect for practicing with a self-controlled KR schedule compared to a yoked schedule was found for temporal accuracy in transfer, but a similar advantage was not evident in retention. There were no significant differences as a function of KR schedule or tDCS for spatial accuracy in retention or transfer. The lack of a significant tDCS effect suggests that M1 may not strongly contribute to self-controlled KR learning advantages; however, caution is advised with this interpretation as typical self-controlled learning benefits were not strongly replicated in the present experiment.

  5. 78 FR 61991 - Schedules of Controlled Substances: Temporary Placement of Three Synthetic Phenethylamines Into...

    Science.gov (United States)

    2013-10-10

    ... 202 of the CSA, 21 U.S.C. 812, or if there is no exemption or approval in effect under section 505 of... the last 10 years for use in mapping and investigating the serotonin receptors in the mammalian brain..., and 25B-NBOMe are often purported to be Schedule I hallucinogens like lysergic acid diethylamide (LSD...

  6. Schedules of Controlled Substances: Placement of FDA-Approved Products of Oral Solutions Containing Dronabinol [(-)-delta-9-trans-

    Science.gov (United States)

    2017-11-22

    This final rule adopts without changes an interim final rule with request for comments published in the Federal Register on March 23, 2017. On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. The Drug Enforcement Administration (DEA) maintains FDA-approved products of oral solutions containing dronabinol in schedule II of the Controlled Substances Act.

  7. 'Female condoms give women greater control': a qualitative assessment of the experiences of commercial sex workers in Swaziland.

    Science.gov (United States)

    Mathenjwa, Thulile; Maharaj, Pranitha

    2012-10-01

    To explore commercial sex workers' experiences with the female condom in Swaziland. This is a qualitative study that draws on two focus group discussions and ten individual in-depth interviews with female commercial sex workers in Lavumisa, Swaziland. The findings suggest that the majority of female sex workers prefer to use the female condom with their clients because it offers them greater control over the sexual encounter. Other factors that facilitate its use include the absence of side effects, the enhancement of sexual pleasure and protection against the risk of STIs (including HIV). In addition, the women reported that the female condom is stronger and more resistant to breakage than the male condom. Moreover, the female condoms can be inserted well in advance of sexual intercourse. Difficulties of insertion, partner objection and limited product availability were some of the barriers to the use of the device. There was also a tendency to reuse the female condoms because of lack of product availability and privacy to insert it. Although female condom use involves negotiation with clients, the fact that it offers sex workers an independent method of protection gives them more power and also, increases their ability to control their sexual and reproductive health.

  8. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    Energy Technology Data Exchange (ETDEWEB)

    St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald Keith [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    ; Provide real-time requirements monitoring; Maximize their collective situational awareness to improve decision-making; and Leverage macro data to better support resource allocation. INL has partnered with several commercial NPP utilities to develop a number of advanced outage management technologies. These outage management technologies have focused on both collaborative technologies for control centers and developing mobile technologies for NPP field workers. This report describes recent efforts made in developing a suite of outage technologies to support more effective schedule management. Currently, a master outage schedule is created months in advance using the plant’s existing scheduling software (e.g., Primavera P6). Typically, during the outage, the latest version of the schedule is printed at the beginning of each shift. INL and its partners are developing technologies that will have capabilities such as Automatic Schedule Updating, Automatic Pending Support Notifications, and the ability to allocate and schedule outage support task resources on a sub-hour basis (e.g., outage Micro-Scheduling). The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how the outage scheduling technologies INL is developing helps address those challenges, and the latest developments on this task (e.g., work accomplished to date and the path forward)

  9. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    International Nuclear Information System (INIS)

    St Germain, Shawn Walter; Farris, Ronald Keith; Thomas, Kenneth David

    2015-01-01

    ; Provide real-time requirements monitoring; Maximize their collective situational awareness to improve decision-making; and Leverage macro data to better support resource allocation. INL has partnered with several commercial NPP utilities to develop a number of advanced outage management technologies. These outage management technologies have focused on both collaborative technologies for control centers and developing mobile technologies for NPP field workers. This report describes recent efforts made in developing a suite of outage technologies to support more effective schedule management. Currently, a master outage schedule is created months in advance using the plant's existing scheduling software (e.g., Primavera P6). Typically, during the outage, the latest version of the schedule is printed at the beginning of each shift. INL and its partners are developing technologies that will have capabilities such as Automatic Schedule Updating, Automatic Pending Support Notifications, and the ability to allocate and schedule outage support task resources on a sub-hour basis (e.g., outage Micro-Scheduling). The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how the outage scheduling technologies INL is developing helps address those challenges, and the latest developments on this task (e.g., work accomplished to date and the path forward)

  10. Cost-benefit analysis for invasive species control: the case of greater Canada goose Branta canadensis in Flanders (northern Belgium

    Directory of Open Access Journals (Sweden)

    Nikolaas Reyns

    2018-01-01

    Full Text Available Background Sound decisions on control actions for established invasive alien species (IAS require information on ecological as well as socio-economic impact of the species and of its management. Cost-benefit analysis provides part of this information, yet has received relatively little attention in the scientific literature on IAS. Methods We apply a bio-economic model in a cost-benefit analysis framework to greater Canada goose Branta canadensis, an IAS with documented social, economic and ecological impacts in Flanders (northern Belgium. We compared a business as usual (BAU scenario which involved non-coordinated hunting and egg destruction with an enhanced scenario based on a continuation of these activities but supplemented with coordinated capture of moulting birds. To assess population growth under the BAU scenario we fitted a logistic growth model to the observed pre-moult capture population. Projected damage costs included water eutrophication and damage to cultivated grasslands and were calculated for all scenarios. Management costs of the moult captures were based on a representative average of the actual cost of planning and executing moult captures. Results Comparing the scenarios with different capture rates, different costs for eutrophication and various discount rates, showed avoided damage costs were in the range of 21.15 M€ to 45.82 M€ under the moult capture scenario. The lowest value for the avoided costs applied to the scenario where we lowered the capture rate by 10%. The highest value occurred in the scenario where we lowered the real discount rate from 4% to 2.5%. Discussion The reduction in damage costs always outweighed the additional management costs of moult captures. Therefore, additional coordinated moult captures could be applied to limit the negative economic impact of greater Canada goose at a regional scale. We further discuss the strengths and weaknesses of our approach and its potential application to other

  11. Cost-benefit analysis for invasive species control: the case of greater Canada goose Branta canadensis in Flanders (northern Belgium)

    Science.gov (United States)

    Casaer, Jim; De Smet, Lieven; Devos, Koen; Huysentruyt, Frank; Robertson, Peter A.; Verbeke, Tom

    2018-01-01

    Background Sound decisions on control actions for established invasive alien species (IAS) require information on ecological as well as socio-economic impact of the species and of its management. Cost-benefit analysis provides part of this information, yet has received relatively little attention in the scientific literature on IAS. Methods We apply a bio-economic model in a cost-benefit analysis framework to greater Canada goose Branta canadensis, an IAS with documented social, economic and ecological impacts in Flanders (northern Belgium). We compared a business as usual (BAU) scenario which involved non-coordinated hunting and egg destruction with an enhanced scenario based on a continuation of these activities but supplemented with coordinated capture of moulting birds. To assess population growth under the BAU scenario we fitted a logistic growth model to the observed pre-moult capture population. Projected damage costs included water eutrophication and damage to cultivated grasslands and were calculated for all scenarios. Management costs of the moult captures were based on a representative average of the actual cost of planning and executing moult captures. Results Comparing the scenarios with different capture rates, different costs for eutrophication and various discount rates, showed avoided damage costs were in the range of 21.15 M€ to 45.82 M€ under the moult capture scenario. The lowest value for the avoided costs applied to the scenario where we lowered the capture rate by 10%. The highest value occurred in the scenario where we lowered the real discount rate from 4% to 2.5%. Discussion The reduction in damage costs always outweighed the additional management costs of moult captures. Therefore, additional coordinated moult captures could be applied to limit the negative economic impact of greater Canada goose at a regional scale. We further discuss the strengths and weaknesses of our approach and its potential application to other IAS. PMID

  12. Optimising radiation outcomes, scheduling patient waiting lists for maximum population tumour control

    International Nuclear Information System (INIS)

    Ebert, M.A.; Jennings, L.; Kearvell, R.; Bydder, S.

    2011-01-01

    Full text: Delays in the commencement of radiotherapy, possibly due to resource constraints, are known to impact on control-related outcomes. We sought an objective solution for patient prioritisation based on tumour control probability (TCP). With a utilitarian objective for maximising TCP in a population of M patients, with patient i waiting a time between diagnosis and treatment of Ti and a mean wait time of TMean, the optimisation problem is as shown. A linear-quadratic/Poissonian model for cell survival/TCP was considered including cell doubling during the wait time. Solutions to several distributions of patient population characteristics were examined together with the expected change in TCP for the population and individuals. An analytical solution to the optimisation problem was found which gives the optimal wait time for each patient as a function of the distribution of radiobiological characteristics in the population. This solution does not allow a negativity constraint on an individual's optimised waiting time so a waiting list simulation was developed to enforce that. Optimal wait time distributions were calculated for situations where patients are allocated distinct diagnostic groups (sharing radiobiological parameters) and for a (log-normal) distribution of doubling times in the population. In order to meet the utilitarian objective, the optimal solutions require patients with rapid cell doubling times to be accelerated up the waiting list at the expense of those with slowly proliferating tumours. The net population benefit however is comparable to or greater then the expected benefit from beam intensity modulation or dose escalation.

  13. The Official Control beyond the Official Control. How To Plan And Schedule Controls Starting From Risk Assessment Along The Agro-Food Supply Chain.

    Science.gov (United States)

    Panunzio, M F; Caporizzi, R; Lagravinese, D; Conversano, M

    2015-01-01

    Every year the Italian Ministry of Health, on the basis of regional data, draws up the "Report on Official Controls" to be submitted to the Parliament. The report contains abundant data, diagrams and charts and illustrates the number and type of official controls (OC) performed by the pertinent Bodies (Ministry of Health, Regional and Local Health Authorities) over the previous year on Food Business Operators (FBO), in accordance with the EC Regulation 882/2004. The trend - which has consolidated over the years - relates to the multiplicity of OC and shows a decrease of such controls compared to an increase in "non-conformities". OC frequency is established by the Regional Authorities on the basis of the categorisation of both a "generic risk" for companies calculated taking into account the probability of occurrence of a "non-conformity", and a "specific" risk, assessed on the basis of the results of the OC actually performed on a given "Operatore del Settore Alimentare" (Food Sector Operator, in Italian: OSA). Thus, categorisation (i.e. the probability of occurrence of non-conformities) is the main driver of the OC scheduling and planning process. We have been asking ourselves whether the current OC planning/scheduling method is still suitable for ensuring food safety in the face of internalisation of the food supply chain. As a matter of fact, food safety is now becoming increasingly variable due to the globalization of consumption where "farm to fork", rather than "border to fork", food safety must be ensured. On the basis of these considerations, a different OC planning /scheduling method is being proposed based on the assessment of risks and the estimation of the occurrence of the same along the agro-food chain.

  14. Travel time and concurrent-schedule choice: retrospective versus prospective control.

    OpenAIRE

    Davison, M; Elliffe, D

    2000-01-01

    Six pigeons were trained on concurrent variable-interval schedules in which two different travel times between alternatives, 4.5 and 0.5 s, were randomly arranged. In Part 1, the next travel time was signaled while the subjects were responding on each alternative. Generalized matching analyses of performance in the presence of the two travel-time signals showed significantly higher response and time sensitivity when the longer travel time was signaled compared to when the shorter time was sig...

  15. Heliostat-field gain-scheduling control applied to a two-step solar hydrogen production plant

    International Nuclear Information System (INIS)

    Roca, Lidia; Calle, Alberto de la; Yebra, Luis J.

    2013-01-01

    Highlights: ► A control system is proposed for a solar reactor system which produces hydrogen. ► The controller chooses which heliostats from the solar field must be focused. ► A gain scheduling scheme is included to deal with different system dynamics. ► The scheme is tested and tunned in simulation. ► Real experiments show the promising results of this work. -- Abstract: This article describes a temperature control structure designed for the interior of a solar hydrogen reactor based on a two-step ferrite-redox technology. Until now, this temperature has been controlled by manual selection of the heliostats to be focused on the receiver targets. However, the strong system dependency on operating conditions suggests that the procedure be automated in order to ensure the desired setpoint change response. The aims are to maintain the desired temperatures and to make the setpoint switch as fast as possible, keeping plant conditions within the margins of safety. The scheme proposed includes a procedure for selecting the heliostats to be focused on the reactor by using a simple model of the solar field and a gain scheduling control system which changes the control tuning parameters to deal with the varying dynamics observed during the process. Real experiments show the promising results of this work.

  16. The moderating effect of control over work scheduling and overtime on the relationship between workload demands and perceived job risk.

    Science.gov (United States)

    Näswall, Katharina; Burt, Christopher D B; Pearce, Megan

    2015-01-01

    This study investigated the impact of workload demands on perceived job risk using the Job Demand-Control model as a research framework. The primary objective was to test the hypothesis that employee control over work scheduling and overtime would moderate the relationship between workload demands and perceived job risk. Ninety-six participants working in a variety of industries completed measures of workload demands, and of control over work scheduling and overtime, and a measure of perceived job risk. Workload demands predicted higher perceptions of job risk. However, the results also suggest that control over overtime moderated this relationship, where those with the combination of high workload demands and low control over overtime reported higher levels of perceived risk. The results indicate that the JDC model is applicable to safety research. The results suggest that employee control over workload demands is an important variable to consider in terms of managing workplace safety. The present study also points to important areas for future research to explore in order to further understand the connection between demands and safety.

  17. Speed Synchronization Control of Integrated Motor–Transmission Powertrain over CAN through Active Period-Scheduling Approach

    Directory of Open Access Journals (Sweden)

    Wanke Cao

    2017-11-01

    Full Text Available This paper deals with the speed synchronization control of integrated motor–transmission (IMT powertrain systems in pure electric vehicles (EVs over a controller area network (CAN subject to both network-induced delays and network congestion. A CAN has advantages over point-to-point communication; however, it imposes network-induced delays and network congestion into the control system, which can deteriorate the shifting quality and make system integration difficult. This paper presents a co-design scheme combining active period scheduling and discrete-time slip mode control (SMC to deal with both network-induced delays and network congestion of the CAN, which improves the speed synchronization control for high shifting quality and prevents network congestion for the system’s integration. The results of simulations and hardware-in-loop experiments show the effectiveness of the proposed scheme, which can ensure satisfactory speed synchronization performance while significantly reducing the network’s utilization.

  18. Job scheduling in a heterogenous grid environment

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  19. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  20. An Optimization of Manufacturing Systems using a Feedback Control Scheduling Model

    Science.gov (United States)

    Ikome, John M.; Kanakana, Grace M.

    2018-03-01

    In complex production system that involves multiple process, unplanned disruption often turn to make the entire production system vulnerable to a number of problems which leads to customer’s dissatisfaction. However, this problem has been an ongoing problem that requires a research and methods to streamline the entire process or develop a model that will address it, in contrast to this, we have developed a feedback scheduling model that can minimize some of this problem and after a number of experiment, it shows that some of this problems can be eliminated if the correct remedial actions are implemented on time.

  1. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  2. The influence of intermittent fasting on the circadian pattern of melatonin while controlling for caloric intake, energy expenditure, light exposure, and sleep schedules: A preliminary report

    Directory of Open Access Journals (Sweden)

    Aljohara S Almeneessier

    2017-01-01

    Conclusions: In this preliminary report, under controlled conditions of light exposure, meal composition, energy expenditure, and sleep-wake schedules, intermittent fasting has no significant influence on the circadian pattern of melatonin.

  3. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  4. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  5. Modeling and distributed gain scheduling strategy for load frequency control in smart grids with communication topology changes.

    Science.gov (United States)

    Liu, Shichao; Liu, Xiaoping P; El Saddik, Abdulmotaleb

    2014-03-01

    In this paper, we investigate the modeling and distributed control problems for the load frequency control (LFC) in a smart grid. In contrast with existing works, we consider more practical and real scenarios, where the communication topology of the smart grid changes because of either link failures or packet losses. These topology changes are modeled as a time-varying communication topology matrix. By using this matrix, a new closed-loop power system model is proposed to integrate the communication topology changes into the dynamics of a physical power system. The globally asymptotical stability of this closed-loop power system is analyzed. A distributed gain scheduling LFC strategy is proposed to compensate for the potential degradation of dynamic performance (mean square errors of state vectors) of the power system under communication topology changes. In comparison to conventional centralized control approaches, the proposed method can improve the robustness of the smart grid to the variation of the communication network as well as to reduce computation load. Simulation results show that the proposed distributed gain scheduling approach is capable to improve the robustness of the smart grid to communication topology changes. © 2013 ISA. Published by ISA. All rights reserved.

  6. A Flexible Job Shop Scheduling Problem with Controllable Processing Times to Optimize Total Cost of Delay and Processing

    Directory of Open Access Journals (Sweden)

    Hadi Mokhtari

    2015-11-01

    Full Text Available In this paper, the flexible job shop scheduling problem with machine flexibility and controllable process times is studied. The main idea is that the processing times of operations may be controlled by consumptions of additional resources. The purpose of this paper to find the best trade-off between processing cost and delay cost in order to minimize the total costs. The proposed model, flexible job shop scheduling with controllable processing times (FJCPT, is formulated as an integer non-linear programming (INLP model and then it is converted into an integer linear programming (ILP model. Due to NP-hardness of FJCPT, conventional analytic optimization methods are not efficient. Hence, in order to solve the problem, a Scatter Search (SS, as an efficient metaheuristic method, is developed. To show the effectiveness of the proposed method, numerical experiments are conducted. The efficiency of the proposed algorithm is compared with that of a genetic algorithm (GA available in the literature for solving FJSP problem. The results showed that the proposed SS provide better solutions than the existing GA.

  7. Schedules of Controlled Substances: Placement of FDA-Approved Products of Oral Solutions Containing Dronabinol [(-)-delta-9-transtetrahydrocannabinol (delta-9-THC)] in Schedule II. Interim final rule, with request for comments.

    Science.gov (United States)

    2017-03-23

    On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. Thereafter, the Department of Health and Human Services (HHS) provided the Drug Enforcement Administration (DEA) with a scheduling recommendation that would result in Syndros (and other oral solutions containing dronabinol) being placed in schedule II of the Controlled Substances Act (CSA). In accordance with the CSA, as revised by the Improving Regulatory Transparency for New Medical Therapies Act, DEA is hereby issuing an interim final rule placing FDA-approved products of oral solutions containing dronabinol in schedule II of the CSA.

  8. A Novel Energy Efficient Topology Control Scheme Based on a Coverage-Preserving and Sleep Scheduling Model for Sensor Networks

    Science.gov (United States)

    Shi, Binbin; Wei, Wei; Wang, Yihuai; Shu, Wanneng

    2016-01-01

    In high-density sensor networks, scheduling some sensor nodes to be in the sleep mode while other sensor nodes remain active for monitoring or forwarding packets is an effective control scheme to conserve energy. In this paper, a Coverage-Preserving Control Scheduling Scheme (CPCSS) based on a cloud model and redundancy degree in sensor networks is proposed. Firstly, the normal cloud model is adopted for calculating the similarity degree between the sensor nodes in terms of their historical data, and then all nodes in each grid of the target area can be classified into several categories. Secondly, the redundancy degree of a node is calculated according to its sensing area being covered by the neighboring sensors. Finally, a centralized approximation algorithm based on the partition of the target area is designed to obtain the approximate minimum set of nodes, which can retain the sufficient coverage of the target region and ensure the connectivity of the network at the same time. The simulation results show that the proposed CPCSS can balance the energy consumption and optimize the coverage performance of the sensor network. PMID:27754405

  9. Energy Efficient Medium Access Control Protocol for Clustered Wireless Sensor Networks with Adaptive Cross-Layer Scheduling.

    Science.gov (United States)

    Sefuba, Maria; Walingo, Tom; Takawira, Fambirai

    2015-09-18

    This paper presents an Energy Efficient Medium Access Control (MAC) protocol for clustered wireless sensor networks that aims to improve energy efficiency and delay performance. The proposed protocol employs an adaptive cross-layer intra-cluster scheduling and an inter-cluster relay selection diversity. The scheduling is based on available data packets and remaining energy level of the source node (SN). This helps to minimize idle listening on nodes without data to transmit as well as reducing control packet overhead. The relay selection diversity is carried out between clusters, by the cluster head (CH), and the base station (BS). The diversity helps to improve network reliability and prolong the network lifetime. Relay selection is determined based on the communication distance, the remaining energy and the channel quality indicator (CQI) for the relay cluster head (RCH). An analytical framework for energy consumption and transmission delay for the proposed MAC protocol is presented in this work. The performance of the proposed MAC protocol is evaluated based on transmission delay, energy consumption, and network lifetime. The results obtained indicate that the proposed MAC protocol provides improved performance than traditional cluster based MAC protocols.

  10. A Novel Energy Efficient Topology Control Scheme Based on a Coverage-Preserving and Sleep Scheduling Model for Sensor Networks.

    Science.gov (United States)

    Shi, Binbin; Wei, Wei; Wang, Yihuai; Shu, Wanneng

    2016-10-14

    In high-density sensor networks, scheduling some sensor nodes to be in the sleep mode while other sensor nodes remain active for monitoring or forwarding packets is an effective control scheme to conserve energy. In this paper, a Coverage-Preserving Control Scheduling Scheme (CPCSS) based on a cloud model and redundancy degree in sensor networks is proposed. Firstly, the normal cloud model is adopted for calculating the similarity degree between the sensor nodes in terms of their historical data, and then all nodes in each grid of the target area can be classified into several categories. Secondly, the redundancy degree of a node is calculated according to its sensing area being covered by the neighboring sensors. Finally, a centralized approximation algorithm based on the partition of the target area is designed to obtain the approximate minimum set of nodes, which can retain the sufficient coverage of the target region and ensure the connectivity of the network at the same time. The simulation results show that the proposed CPCSS can balance the energy consumption and optimize the coverage performance of the sensor network.

  11. A Novel Energy Efficient Topology Control Scheme Based on a Coverage-Preserving and Sleep Scheduling Model for Sensor Networks

    Directory of Open Access Journals (Sweden)

    Binbin Shi

    2016-10-01

    Full Text Available In high-density sensor networks, scheduling some sensor nodes to be in the sleep mode while other sensor nodes remain active for monitoring or forwarding packets is an effective control scheme to conserve energy. In this paper, a Coverage-Preserving Control Scheduling Scheme (CPCSS based on a cloud model and redundancy degree in sensor networks is proposed. Firstly, the normal cloud model is adopted for calculating the similarity degree between the sensor nodes in terms of their historical data, and then all nodes in each grid of the target area can be classified into several categories. Secondly, the redundancy degree of a node is calculated according to its sensing area being covered by the neighboring sensors. Finally, a centralized approximation algorithm based on the partition of the target area is designed to obtain the approximate minimum set of nodes, which can retain the sufficient coverage of the target region and ensure the connectivity of the network at the same time. The simulation results show that the proposed CPCSS can balance the energy consumption and optimize the coverage performance of the sensor network.

  12. 75 FR 47451 - Schedules of Controlled Substances; Placement of 2,5-Dimethoxy-4-(n)-propylthiophenethylamine and...

    Science.gov (United States)

    2010-08-06

    ... only one piece of background scientific data used to evaluate the abuse potential of drugs or other... opiates previously scheduled under the CSA. Even though the scheduling of BZP was finalized more than six...

  13. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  14. Robust design of a 2-DOF GMV controller: a direct self-tuning and fuzzy scheduling approach.

    Science.gov (United States)

    Silveira, Antonio S; Rodríguez, Jaime E N; Coelho, Antonio A R

    2012-01-01

    This paper presents a study on self-tuning control strategies with generalized minimum variance control in a fixed two degree of freedom structure-or simply GMV2DOF-within two adaptive perspectives. One, from the process model point of view, using a recursive least squares estimator algorithm for direct self-tuning design, and another, using a Mamdani fuzzy GMV2DOF parameters scheduling technique based on analytical and physical interpretations from robustness analysis of the system. Both strategies are assessed by simulation and real plants experimentation environments composed of a damped pendulum and an under development wind tunnel from the Department of Automation and Systems of the Federal University of Santa Catarina. Copyright © 2011 ISA. Published by Elsevier Ltd. All rights reserved.

  15. A model-based gain scheduling approach for controlling the common-rail system for GDI engines

    Science.gov (United States)

    di Gaeta, Alessandro; Montanaro, Umberto; Fiengo, Giovanni; Palladino, Angelo; Giglio, Veniero

    2012-04-01

    The progressive reduction in vehicle emission requirements have forced the automotive industry to invest in research for developing alternative and more efficient control strategies. All control features and resources are permanently active in an electronic control unit (ECU), ensuring the best performance with respect to emissions, fuel economy, driveability and diagnostics, independently from engine working point. In this article, a considerable step forward has been achieved by the common-rail technology which has made possible to vary the injection pressure over the entire engine speed range. As a consequence, the injection of a fixed amount of fuel is more precise and multiple injections in a combustion cycle can be made. In this article, a novel gain scheduling pressure controller for gasoline direct injection (GDI) engine is designed to stabilise the mean fuel pressure into the rail and to track demanded pressure trajectories. By exploiting a simple control-oriented model describing the mean pressure dynamics in the rail, the control structure turns to be simple enough to be effectively implemented in commercial ECUs. Experimental results in a wide range of operating points confirm the effectiveness of the proposed control method to tame efficiently the mean value pressure dynamics of the plant showing a good accuracy and robustness with respect to unavoidable parameters uncertainties, unmodelled dynamics, and hidden coupling terms.

  16. Fuzzy-Logic-Based Gain-Scheduling Control for State-of-Charge Balance of Distributed Energy Storage Systems for DC Microgrids

    DEFF Research Database (Denmark)

    Aldana, Nelson Leonardo Diaz; Dragicevic, Tomislav; Vasquez, Juan Carlos

    2014-01-01

    -charge or deep-discharge in one of the energy storage units. Primary control in a microgrid is responsible for power sharing among units; and droop control is typically used in this stage. This paper proposes a modular and decentralized gain-scheduling control strategy based on fuzzy logic that ensures balanced...

  17. Flexible Working and Couples' Coordination of Time Schedules

    OpenAIRE

    Bryan, Mark L.; Sevilla Sanz, Almudena

    2014-01-01

    Using previously unexploited data on time scheduling in the employment and household contexts, we investigate the effect of flexible working on couples' coordination of their daily work time schedules in the UK. We consider three distinct dimensions of flexible working: flexibility of daily start and finish times (flexitime), flexibility of work times over the year (annualised hours), and generalised control of working hours. We find that in couples with flexitime there is greater spouse sync...

  18. The Influence of Higher Protein Intake and Greater Eating Frequency on Appetite Control in Overweight and Obese Men

    Science.gov (United States)

    Leidy, Heather J.; Armstrong, Cheryl L.H.; Tang, Minghua; Mattes, Richard D.; Campbell, Wayne W.

    2014-01-01

    The purpose of this study was to determine the effects of dietary protein intake and eating frequency on perceived appetite, satiety, and hormonal responses in overweight/obese men. Thirteen men (age 51 ± 4 years; BMI 31.3 ± 0.8 kg/m2) consumed eucaloric diets containing normal protein (79 ± 2 g protein/day; 14% of energy intake as protein) or higher protein (138 ± 3 g protein/day; 25% of energy intake as protein) equally divided among three eating occasions (3-EO; every 4 h) or six eating occasions (6-EO; every 2 h) on four separate days in randomized order. Hunger, fullness, plasma glucose, and hormonal responses were assessed throughout 11 h. No protein × eating frequency interactions were observed for any of the outcomes. Independent of eating frequency, higher protein led to greater daily fullness (P < 0.05) and peptide YY (PYY) concentrations (P < 0.05). In contrast, higher protein led to greater daily ghrelin concentrations (P < 0.05) vs. normal protein. Protein quantity did not influence daily hunger, glucose, or insulin concentrations. Independent of dietary protein, 6-EO led to lower daily fullness (P < 0.05) and PYY concentrations (P < 0.05). The 6-EO also led to lower glucose (P < 0.05) and insulin concentrations (P < 0.05) vs. 3-EO. Although the hunger-related perceived sensations and hormonal responses were conflicting, the fullness-related responses were consistently greater with higher protein intake but lower with increased eating frequency. Collectively, these data suggest that higher protein intake promotes satiety and challenge the concept that increasing the number of eating occasions enhances satiety in overweight and obese men. PMID:20339363

  19. Electric space heating scheduling for real-time explicit power control in active distribution networks

    DEFF Research Database (Denmark)

    Costanzo, Giuseppe Tommaso; Bernstein, Andrey; Chamorro, Lorenzo Reyes

    2015-01-01

    This paper presents a systematic approach for abstracting the flexibility of a building space heating system and using it within a composable framework for real-time explicit power control of microgrids and, more in general, active distribution networks. In particular, the proposed approach...... is developed within the context of a previously defined microgrid control framework, called COMMELEC, conceived for the explicit and real-time control of these specific networks. The designed control algorithm is totally independent from the need of a building model and allows exploiting the intrinsic thermal...... inertia for real-time control. The paper first discusses the general approach, then it proves its validity via dedicated simulations performed on specific case study composed by the CIGRE LV microgrid benchmark proposed by the Cigré TF C6.04.02....

  20. THE HYDROVINYLATION AND RELATED REACTIONS: NEW PROTOCOLS AND CONTROL ELEMENTS IN SEARCH OF GREATER SYNTHETIC EFFICIENCY AND SELECTIVITY. (R826120)

    Science.gov (United States)

    New reaction conditions and stereochemical control elements for heterodimerization between ethylene (or propylene) and functionalized vinyl arenes are highlighted (see equation). For example, an enantioselective version of the hydrovinylation reaction uses [{(allyl)NiBr}...

  1. Stability of formation control using a consensus protocol under directed communications with two time delays and delay scheduling

    Science.gov (United States)

    Cepeda-Gomez, Rudy; Olgac, Nejat

    2016-01-01

    We consider a linear algorithm to achieve formation control in a group of agents which are driven by second-order dynamics and affected by two rationally independent delays. One of the delays is in the position and the other in the velocity information channels. These delays are taken as constant and uniform throughout the system. The communication topology is assumed to be directed and fixed. The formation is attained by adding a supplementary control term to the stabilising consensus protocol. In preparation for the formation control logic, we first study the stability of the consensus, using the recent cluster treatment of characteristic roots (CTCR) paradigm. This effort results in a unique depiction of the non-conservative stability boundaries in the domain of the delays. However, CTCR requires the knowledge of the potential stability switching loci exhaustively within this domain. The creation of these loci is done in a new surrogate coordinate system, called the 'spectral delay space (SDS)'. The relative stability is also investigated, which has to do with the speed of reaching consensus. This step leads to a paradoxical control design concept, called the 'delay scheduling', which highlights the fact that the group behaviour may be enhanced by increasing the delays. These steps lead to a control strategy to establish a desired group formation that guarantees spacing among the agents. Example case studies are presented to validate the underlying analytical derivations.

  2. Greater Biopsy Core Number Is Associated With Improved Biochemical Control in Patients Treated With Permanent Prostate Brachytherapy

    International Nuclear Information System (INIS)

    Bittner, Nathan; Merrick, Gregory S.; Galbreath, Robert W.; Butler, Wayne M.; Adamovich, Edward; Wallner, Kent E.

    2010-01-01

    Purpose: Standard prostate biopsy schemes underestimate Gleason score in a significant percentage of cases. Extended biopsy improves diagnostic accuracy and provides more reliable prognostic information. In this study, we tested the hypothesis that greater biopsy core number should result in improved treatment outcome through better tailoring of therapy. Methods and Materials: From April 1995 to May 2006, 1,613 prostate cancer patients were treated with permanent brachytherapy. Patients were divided into five groups stratified by the number of prostate biopsy cores (≤6, 7-9, 10-12, 13-20, and >20 cores). Biochemical progression-free survival (bPFS), cause-specific survival (CSS), and overall survival (OS) were evaluated as a function of core number. Results: The median patient age was 66 years, and the median preimplant prostate-specific antigen was 6.5 ng/mL. The overall 10-year bPFS, CSS, and OS were 95.6%, 98.3%, and 78.6%, respectively. When bPFS was analyzed as a function of core number, the 10-year bPFS for patients with >20, 13-20, 10-12, 7-9 and ≤6 cores was 100%, 100%, 98.3%, 95.8%, and 93.0% (p < 0.001), respectively. When evaluated by treatment era (1995-2000 vs. 2001-2006), the number of biopsy cores remained a statistically significant predictor of bPFS. On multivariate analysis, the number of biopsy cores was predictive of bPFS but did not predict for CSS or OS. Conclusion: Greater biopsy core number was associated with a statistically significant improvement in bPFS. Comprehensive regional sampling of the prostate may enhance diagnostic accuracy compared to a standard biopsy scheme, resulting in better tailoring of therapy.

  3. Gain-scheduling control of a monocular vision-based human-following robot

    CSIR Research Space (South Africa)

    Burke, Michael G

    2011-08-01

    Full Text Available , R. and Zisserman, A. (2004). Multiple View Geometry in Computer Vision. Cambridge University Press, 2nd edition. Hutchinson, S., Hager, G., and Corke, P. (1996). A tutorial on visual servo control. IEEE Trans. on Robotics and Automation, 12... environment, in a passive manner, at relatively high speeds and low cost. The control of mobile robots using vision in the feed- back loop falls into the well-studied field of visual servo control. Two primary approaches are used: image-based visual...

  4. Postural control in rheumatoid arthritis patients scheduled for total knee arthroplasty

    NARCIS (Netherlands)

    Tjon A Hen, S.S.K.; Bosch, P.V.; Laan, R.F.J.M.; Mulder, T.

    2000-01-01

    Objective: To investigate the use of compensatory visual and attentional control strategies for standing balance in patients with rheumatoid arthritis (RA) with severe knee joint impairment. Design: Experimental 2-group design. Setting: Specialized clinic for orthopedics, rheumatology, and

  5. Intelligent Control of Diesel Generators Using Gain-Scheduling Based on Online External-Load Estimation

    DEFF Research Database (Denmark)

    Mai, Christian; Jepsen, Kasper Lund; Yang, Zhenyu

    2014-01-01

    The development of an intelligent control solution for a wide range of diesel generators is discussed. Compared with most existing solutions, the advantages of the proposed solution lie in two folds: (i) The proposed control has the plug-and-play capability which is reflected by an automatic...... recognition procedure when it is plugged into a specific diesel generator, such that some extensive manual-tuning of the installed controller can be significantly reduced; (ii) The proposed control has an real-time adaptability by using the online external load estimation, such that the integrated system can...... keep a consistent performance for a wide range of operating conditions. Technically, a general nonlinear dynamic model is firstly developed based on fundamental principles of diesel generators. Then, the system parameters of this model can be identified experimentally or partially retrieved from...

  6. LMI-based gain scheduled controller synthesis for a class of linear parameter varying systems

    DEFF Research Database (Denmark)

    Bendtsen, Jan Dimon; Anderson, Brian; Lanzon, Alexander

    2006-01-01

    This paper presents a novel method for constructing controllers for a class of single-input multiple-output (SIMO) linear parameter varying (LPV) systems. This class of systems encompasses many physical systems, in particular systems where individual components vary with time, and is therefore...... of significant practical relevance to control designers. The control design presented in this paper has the properties that the system matrix of the closed loop is multi-affine in the various scalar parameters, and that the resulting controller ensures a certain degree of stability for the closed loop even when...... as a standard linear time-invariant (LTI) design combined with a set of linear matrix inequalities, which can be solved efficiently with software tools. The design procedure is illustrated by a numerical example....

  7. Multiple Facets of Self-Control in Arab Adolescents: Parallel Pathways to Greater Happiness and Less Physical Aggression

    Science.gov (United States)

    Gavriel-Fried, Belle; Ronen, Tammie; Agbaria, Qutaiba; Orkibi, Hod; Hamama, Liat

    2018-01-01

    Adolescence is a period of dramatic change that necessitates using skills and strengths to reduce physical aggression and increase happiness. This study examined the multiple facets of self-control skills in achieving both goals simultaneously, in a sample of 248 Arab adolescents in Israel. We conceptualized and tested a new multi-mediator model…

  8. Optimal estimation and scheduling in aquifer management using the rapid feedback control method

    Science.gov (United States)

    Ghorbanidehno, Hojat; Kokkinaki, Amalia; Kitanidis, Peter K.; Darve, Eric

    2017-12-01

    Management of water resources systems often involves a large number of parameters, as in the case of large, spatially heterogeneous aquifers, and a large number of "noisy" observations, as in the case of pressure observation in wells. Optimizing the operation of such systems requires both searching among many possible solutions and utilizing new information as it becomes available. However, the computational cost of this task increases rapidly with the size of the problem to the extent that textbook optimization methods are practically impossible to apply. In this paper, we present a new computationally efficient technique as a practical alternative for optimally operating large-scale dynamical systems. The proposed method, which we term Rapid Feedback Controller (RFC), provides a practical approach for combined monitoring, parameter estimation, uncertainty quantification, and optimal control for linear and nonlinear systems with a quadratic cost function. For illustration, we consider the case of a weakly nonlinear uncertain dynamical system with a quadratic objective function, specifically a two-dimensional heterogeneous aquifer management problem. To validate our method, we compare our results with the linear quadratic Gaussian (LQG) method, which is the basic approach for feedback control. We show that the computational cost of the RFC scales only linearly with the number of unknowns, a great improvement compared to the basic LQG control with a computational cost that scales quadratically. We demonstrate that the RFC method can obtain the optimal control values at a greatly reduced computational cost compared to the conventional LQG algorithm with small and controllable losses in the accuracy of the state and parameter estimation.

  9. Schedules of Controlled Substances: Temporary Placement of Six Synthetic Cannabinoids (5F-ADB, 5F-AMB, 5F-APINACA, ADB-FUBINACA, MDMB-

    Science.gov (United States)

    2016-12-21

    The Administrator of the Drug Enforcement Administration is issuing this notice of intent to temporarily schedule six synthetic cannabinoids: methyl 2-(1-(5-fluoropentyl)-1H-indazole-3-carboxamido)-3,3-dimethylbutanoate [5F-ADB; 5F-MDMB-PINACA]; methyl 2-(1-(5-fluoropentyl)-1H-indazole-3-carboxamido)-3-methylbutanoate [5F-AMB]; N-(adamantan-1-yl)-1-(5-fluoropentyl)-1H-indazole-3-carboxamide [5F-APINACA, 5F-AKB48]; N-(1-amino-3,3-dimethyl-1-oxobutan-2-yl)-1-(4-fluorobenzyl)-1H-indazole-3-carboxamide [ADB-FUBINACA]; methyl 2-(1-(cyclohexylmethyl)-1H-indole-3-carboxamido)-3,3-dimethylbutanoate [MDMB-CHMICA, MMB-CHMINACA] and methyl 2-(1-(4-fluorobenzyl)-1H-indazole-3-carboxamido)-3,3-dimethylbutanoate [MDMB-FUBINACA], into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act (CSA). This action is based on a finding by the Administrator that the placement of these synthetic cannabinoids into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. Any final order will impose the administrative, civil, and criminal sanctions and regulatory controls applicable to schedule I substances under the Controlled Substances Act on the manufacture, distribution, possession, importation, exportation of, and research and conduct with, instructional activities of these synthetic cannabinoids.

  10. 40 CFR 82.16 - Phaseout schedule of class II controlled substances.

    Science.gov (United States)

    2010-07-01

    ... results and their significance to subsequent decision-making and technology selection. Full supporting... reasonably be expected to endanger human health or the environment. (3) Within ten working days after receipt... be produced or imported in the specified control period listed in the notice by conferring the rights...

  11. Intramedullary femoral nailing through the trochanteric fossa versus greater trochanter tip : a randomized controlled study with in-depth functional outcome results

    NARCIS (Netherlands)

    Moein, C. M. Ansari; ten Duis, H. J.; Oey, P. L.; de Kort, G. A. P.; van der Meulen, W.; van der Werken, Chr

    2011-01-01

    In a level 1 university trauma center, an explorative randomized controlled study was performed to compare soft tissue damage and functional outcome after antegrade femoral nailing through a trochanteric fossa (also known as piriform fossa) entry point to a greater trochanter entry point in patients

  12. When ethics constrains clinical research: trial design of control arms in "greater than minimal risk" pediatric trials.

    Science.gov (United States)

    de Melo-Martín, Inmaculada; Sondhi, Dolan; Crystal, Ronald G

    2011-09-01

    For more than three decades clinical research in the United States has been explicitly guided by the idea that ethical considerations must be central to research design and practice. In spite of the centrality of this idea, attempting to balance the sometimes conflicting values of advancing scientific knowledge and protecting human subjects continues to pose challenges. Possible conflicts between the standards of scientific research and those of ethics are particularly salient in relation to trial design. Specifically, the choice of a control arm is an aspect of trial design in which ethical and scientific issues are deeply entwined. Although ethical quandaries related to the choice of control arms may arise when conducting any type of clinical trials, they are conspicuous in early phase gene transfer trials that involve highly novel approaches and surgical procedures and have children as the research subjects. Because of children's and their parents' vulnerabilities, in trials that investigate therapies for fatal, rare diseases affecting minors, the scientific and ethical concerns related to choosing appropriate controls are particularly significant. In this paper we use direct gene transfer to the central nervous system to treat late infantile neuronal ceroid lipofuscinosis to illustrate some of these ethical issues and explore possible solutions to real and apparent conflicts between scientific and ethical considerations.

  13. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  14. Two-Stage Optimal Scheduling of Electric Vehicle Charging based on Transactive Control

    DEFF Research Database (Denmark)

    Liu, Zhaoxi; Wu, Qiuwei; Ma, Kang

    2018-01-01

    In this paper, a two-stage optimal charging scheme based on transactive control is proposed for the aggregator to manage day-ahead electricity procurement and real-time EV charging management in order to minimize its total operating cost. The day-ahead electricity procurement considers both the day......-ahead energy cost and expected real-time operation cost. In the real-time charging management, the cost of employing the charging flexibility from the EV owners is explicitly modelled. The aggregator uses a transactive market to manage the real-time charging demand to provide the regulating power. A model...... predictive control (MPC) based method is proposed for the aggregator to clear the transactive market. The realtime charging decisions of the EVs are determined by the clearing of the proposed transactive market according to the realtime requests and preferences of the EV owners. As such, the aggregators...

  15. Energy Savings by Wireless Control of Speed, Scheduling and Travel Times for Hauling Operation

    OpenAIRE

    Rylander, David; Axelsson, Jakob; Wallin, Peter

    2014-01-01

    A Quarry and Aggregate production site consist of sequential production processes and activities to process and produce the output products. Compared to a fixed manufacturing plant, the quarry processes involve mobile machines such as wheel loaders, trucks and articulated haulers and a highly dynamic road infrastructure. Today, the mobile machines are generally not synchronized or controlled towards the overall throughput of the site in real time. This indicates a general improvement potentia...

  16. Cognitive Self-Scheduled Mechanism for Access Control in Noisy Vehicular Ad Hoc Networks

    Directory of Open Access Journals (Sweden)

    Mario Manzano

    2015-01-01

    Full Text Available Within the challenging environment of intelligent transportation systems (ITS, networked control systems such as platooning guidance of autonomous vehicles require innovative mechanisms to provide real-time communications. Although several proposals are currently under discussion, the design of a rapid, efficient, flexible, and reliable medium access control mechanism which meets the specific constraints of such real-time communications applications remains unsolved in this highly dynamic environment. However, cognitive radio (CR combines the capacity to sense the radio spectrum with the flexibility to adapt to transmission parameters in order to maximize system performance and has thus become an effective approach for the design of dynamic spectrum access (DSA mechanisms. This paper presents the enhanced noncooperative cognitive division multiple access (ENCCMA proposal combining time division multiple access (TDMA and frequency division multiple access (FDMA schemes with CR techniques to obtain a mechanism fulfilling the requirements of real-time communications. The analysis presented here considers the IEEE WAVE and 802.11p as reference standards; however, the proposed medium access control (MAC mechanism can be adapted to operate on the physical layer of different standards. The mechanism also offers the advantage of avoiding signaling, thus enhancing system autonomy as well as behavior in adverse scenarios.

  17. Flat tie-line power scheduling control of grid-connected hybrid microgrids

    DEFF Research Database (Denmark)

    Xiao, Zhao xia; Guerrero, Josep M.; Shuang, Jia

    2018-01-01

    In future active distribution networks (ADNs), microgrids (MGs) may have the possibility to control the power dispatched to the ADN by coordinating the output power of their multiple renewable generation units and energy storage units (ESUs). In this way, each MG may support the active distribution....... Also, a method to calculate the tie-line power flow to be exchanged between the MG and the ADN is explored, and a power ramp rate is given between different dispatch intervals. Finally, a simulation model of the hybrid MG is built and tested. Simulation results show that the proposed hierarchical...

  18. Preoperative home-based physical therapy versus usual care to improve functional health of frail older adults scheduled for elective total hip arthroplasty: A pilot randomized controlled trial

    NARCIS (Netherlands)

    Oosting, E.; Jans, M.P.; Dronkers, J.J.; Naber, R.H.; Dronkers-Landman, C.M.; Appelman-De Vries, S.M.; Meeteren, N.L. van

    2012-01-01

    Preoperative home-based physical therapy versus usual care to improve functional health of frail older adults scheduled for elective total hip arthroplasty: a pilot randomized controlled trial. Objective: To investigate the feasibility and preliminary effectiveness of a home-based intensive exercise

  19. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  20. 75 FR 47503 - Schedules of Controlled Substances; Placement of 2,5-Dimethoxy-4-(n)-propylthiophenethylamine and...

    Science.gov (United States)

    2010-08-06

    ... scientific background information, comparisons of potency differences are only one piece of background... the CSA. Even though the scheduling of BZP was finalized more than six years ago, DEA has been advised...

  1. The relationship of femoral neck shaft angle and adiposity to greater trochanteric pain syndrome in women. A case control morphology and anthropometric study

    Science.gov (United States)

    Fearon, AM; Stephens, S; Cook, JL; Smith, PN; Neeman, T; Cormick, W; Scarvell, JM

    2012-01-01

    Objective To evaluate if pelvic or hip width predisposed women to developing greater trochanteric pain syndrome (GTPS). Design Prospective case control study. Participants Four groups were included in the study: those gluteal tendon reconstructions (n=31, GTR), those with conservatively managed GTPS (n=29), those with hip osteoarthritis (n=20, OA) and 22 asymptomatic participants (ASC). Methods Anterior-posterior pelvic x-rays were evaluated for femoral neck shaft angle; acetabular index, and width at the lateral acetabulum, and the superior and lateral aspects of the greater trochanter. Body mass index, and waist, hip and greater trochanter girth were measured. Data were analysed using a one-way analysis of variance (ANOVA; posthoc Scheffe analysis), then multivariate analysis. Results The GTR group had a lower femoral neck shaft angle than the other groups (p=0.007). The OR (95% CI) of having a neck shaft angle of less than 134°, relative to the ASC group: GTR=3.33 (1.26 to 8.85); GTPS=1.4 (0.52 to 3.75); OA=0.85 (0.28 to 2.61). The OR of GTR relative to GTPS was 2.4 (1.01 to 5.6). No group difference was found for acetabular or greater trochanter width. Greater trochanter girth produced the only anthropometric group difference (mean (95% CI) in cm) GTR=103.8 (100.3 to 107.3), GTPS=105.9 (100.2 to 111.6), OA=100.3 (97.7 to 103.9), ASC=99.1 (94.7 to 103.5), (ANOVA: p=0.036). Multivariate analysis confirmed adiposity is associated with GTPS. Conclusion A lower neck shaft angle is a risk factor for, and adiposity is associated with, GTPS in women. PMID:22547561

  2. The accelerated hepatitis B virus vaccination schedule among hemodialysis patients, does it work? A randomized controlled trial.

    Science.gov (United States)

    Imam, Mahmoud Hamada

    2017-12-01

    Hemodialysis patients possess particular attributes which increase the susceptibility to hepatitis B virus (HBV) infections. HBV vaccination significantly decreased the number of new HBV-infected patients. However, the conventional vaccination schedule requires a 6-months duration. This study aimed to examine the efficacy the accelerated vaccination schedule among hemodialysis patients. In this study, 202 consecutive hemodialysis patients at New Jeddah hospital were enrolled. The inclusion criteria were: (1) age was above 18 years, (2) all patients had undetectable HBV surface antigen and antibody. Exclusion criteria included: (1) patient had a positive serum HBV surface antigen and antibody using enzyme-linked immunosorbent assay; (2) patient received a previous course of HBV vaccine, (3) patient who was pregnant. Patients were sequentially randomized to receive either Hepatitis B recombinant DNA vaccine (conventional schedule) or to receive combined hepatitis A and B vaccine injection (accelerated schedule). Testing for HBV surface antibodies was done one and three months after completion of the dosage schedule. The primary outcome was the proportion of seroprotection (defined by serum HBV surface antibodies ≥ 10 mIU/ml). Adverse reactions were evaluated regarding both fever and post-injection pain scale. Patients' age ranged from 18 to 71 years.After 1 and 3 months of completion of the vaccination schedule, there was no statistical difference in the proportion of seroprotected patients among both groups. Accelerated vaccination schedule using combined hepatitis A and B vaccine may be beneficial for HBV seroprotection among hemodialysis patients.

  3. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  4. Influence of a scheduled-waiting task on EMG reactivity and oral habits among facial pain patients and no-pain controls.

    Science.gov (United States)

    Nicholson, R A; Townsend, D R; Gramling, S E

    2000-12-01

    Recent research has strongly implicated the role of psychological stress in the development of temporomandibular disorders (TMD). It is widely reported that oral habits (e.g., teeth grinding) probably provide a behavioral link between stress and the development of TMD symptomatology. Extrapolation of research in the field of adjunctive behavior to the TMD disorders suggests that oral behaviors may develop conjointly with fixed-time (FT) stimulus presentation. The current experiment extended previous research examining this possibility by assessing the influence of experimental stress on masseter EMG and oral habits among persons who met broadband criteria for TMD and no-pain controls. Oral habit activity was assessed via self-report questionnaire whereas masseter muscle activity was measured continuously via electromyography across four phases (Adaptation, Free-Play, Scheduled-Play, Recovery). The Scheduled-Play phase was designed as a stress-reactivity task that included an FT schedule. Results indicated that, consistent with the stress-reactivity model, the Scheduled-Play phase resulted in a significant increase in masseter EMG levels relative to Free-Play and Adaptation, and that this effect was significantly larger for the TMD group relative to controls. The results suggest an adjunctive behavior effect although the effect was not specific to those with facial pain. Oral habit data showed a significant phase effect with oral habits that was significantly higher during the Scheduled-Play phase relative to Adaptation. The findings are the impetus for further study regarding the mechanisms whereby oral habits are developed and maintained despite their painful consequences.

  5. Gain-scheduled {{\\mathscr{H}}}_{\\infty } buckling control of a circular beam-column subject to time-varying axial loads

    Science.gov (United States)

    Schaeffner, Maximilian; Platz, Roland

    2018-06-01

    For slender beam-columns loaded by axial compressive forces, active buckling control provides a possibility to increase the maximum bearable axial load above that of a purely passive structure. In this paper, an approach for gain-scheduled {{\\mathscr{H}}}∞ buckling control of a slender beam-column with circular cross-section subject to time-varying axial loads is investigated experimentally. Piezo-elastic supports with integrated piezoelectric stack actuators at the beam-column ends allow an active stabilization in arbitrary lateral directions. The axial loads on the beam-column influence its lateral dynamic behavior and, eventually, cause the beam-column to buckle. A reduced modal model of the beam-column subject to axial loads including the dynamics of the electrical components is set up and calibrated with experimental data. Particularly, the linear parameter-varying open-loop plant is used to design a model-based gain-scheduled {{\\mathscr{H}}}∞ buckling control that is implemented in an experimental test setup. The beam-column is loaded by ramp- and step-shaped time-varying axial compressive loads that result in a lateral deformation of the beam-column due to imperfections, such as predeformation, eccentric loading or clamping moments. The lateral deformations and the maximum bearable loads of the beam-column are analyzed and compared for the beam-column with and without gain-scheduled {{\\mathscr{H}}}∞ buckling control or, respectively, active and passive configuration. With the proposed gain-scheduled {{\\mathscr{H}}}∞ buckling control it is possible to increase the maximum bearable load of the active beam-column by 19% for ramp-shaped axial loads and to significantly reduce the beam-column deformations for step-shaped axial loads compared to the passive structure.

  6. An interpolated activity during the knowledge-of-results delay interval eliminates the learning advantages of self-controlled feedback schedules.

    Science.gov (United States)

    Carter, Michael J; Ste-Marie, Diane M

    2017-03-01

    The learning advantages of self-controlled knowledge-of-results (KR) schedules compared to yoked schedules have been linked to the optimization of the informational value of the KR received for the enhancement of one's error-detection capabilities. This suggests that information-processing activities that occur after motor execution, but prior to receiving KR (i.e., the KR-delay interval) may underlie self-controlled KR learning advantages. The present experiment investigated whether self-controlled KR learning benefits would be eliminated if an interpolated activity was performed during the KR-delay interval. Participants practiced a waveform matching task that required two rapid elbow extension-flexion reversals in one of four groups using a factorial combination of choice (self-controlled, yoked) and KR-delay interval (empty, interpolated). The waveform had specific spatial and temporal constraints, and an overall movement time goal. The results indicated that the self-controlled + empty group had superior retention and transfer scores compared to all other groups. Moreover, the self-controlled + interpolated and yoked + interpolated groups did not differ significantly in retention and transfer; thus, the interpolated activity eliminated the typically found learning benefits of self-controlled KR. No significant differences were found between the two yoked groups. We suggest the interpolated activity interfered with information-processing activities specific to self-controlled KR conditions that occur during the KR-delay interval and that these activities are vital for reaping the associated learning benefits. These findings add to the growing evidence that challenge the motivational account of self-controlled KR learning advantages and instead highlights informational factors associated with the KR-delay interval as an important variable for motor learning under self-controlled KR schedules.

  7. Initial Investigations of Controller Tools and Procedures for Schedule-Based Arrival Operations with Mixed Flight-Deck Interval Management Equipage

    Science.gov (United States)

    Callantine, Todd J.; Cabrall, Christopher; Kupfer, Michael; Omar, Faisal G.; Prevot, Thomas

    2012-01-01

    NASA?s Air Traffic Management Demonstration-1 (ATD-1) is a multi-year effort to demonstrate high-throughput, fuel-efficient arrivals at a major U.S. airport using NASA-developed scheduling automation, controller decision-support tools, and ADS-B-enabled Flight-Deck Interval Management (FIM) avionics. First-year accomplishments include the development of a concept of operations for managing scheduled arrivals flying Optimized Profile Descents with equipped aircraft conducting FIM operations, and the integration of laboratory prototypes of the core ATD-1 technologies. Following each integration phase, a human-in-the-loop simulation was conducted to evaluate and refine controller tools, procedures, and clearance phraseology. From a ground-side perspective, the results indicate the concept is viable and the operations are safe and acceptable. Additional training is required for smooth operations that yield notable benefits, particularly in the areas of FIM operations and clearance phraseology.

  8. 77 FR 488 - Control of Emissions From New Highway Vehicles and Engines; Approval of New Scheduled Maintenance...

    Science.gov (United States)

    2012-01-05

    ... (e.g., dump trucks, concrete mixers, refuse trucks, and other centrally-fueled vehicles) were... intervals for DEF-based SCR. For vocational vehicles such as dump trucks, concrete mixers, refuse trucks and... Engines; Approval of New Scheduled Maintenance for Selective Catalytic Reduction Technologies AGENCY...

  9. Greater intake of fruit and vegetables is associated with a lower risk of osteoporotic hip fractures in elderly Chinese: a 1:1 matched case-control study.

    Science.gov (United States)

    Xie, H-L; Wu, B-H; Xue, W-Q; He, M-G; Fan, F; Ouyang, W-F; Tu, S-L; Zhu, H-L; Chen, Y-M

    2013-11-01

    In this case-control study, we examined the relationship between the consumption of fruit and vegetables and risk of hip fractures in 646 pairs of incident cases and controls in elderly Chinese. We found that greater consumption of both fruit and vegetables in men and vegetables in women was associated with a lower risk of osteoporotic hip fractures in elderly Chinese. The association between fruit and vegetable consumption and the risk of osteoporotic fractures remains controversial due to limited published evidence. The purpose of this study was to determine whether consuming fruits and vegetables has a protective effect against hip fractures. Between January 2008 and December 2012, 646 (162 males, 484 females) incident cases (70.9 ± 6.8 years) of hip fractures were enrolled from five hospitals, with 646 sex- and age-matched (±3 years) controls (70.7 ± 6.8 years) from hospitals or the community. Face-to-face interviews were conducted to assess habitual dietary intakes using a 79-item food frequency questionnaire and various covariates by structured questionnaires. Multivariate conditional logistic regression analyses showed dose-dependent inverse correlations between the intake of total fruit (p-trend = 0.014), total vegetables (p-trend fruits and vegetables combined (p-trend fruits, vegetables and the combination of fruits and vegetables were 0.53 (0.32-0.87), 0.37 (0.23-0.60) and 0.25 (0.15-0.41), respectively. Stratified analyses showed that the benefits remained significant in males (p = 0.001) but not in females (p = 0.210) (p-interaction 0.045). Among the subcategories of fruits and vegetables, similar associations were observed for all subgroups except light-coloured fruits. Our findings suggest that greater consumption of both fruits and vegetables in men and vegetables in women may decrease the risk of osteoporotic hip fractures in elderly Chinese.

  10. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  11. The metabolites in peripheral blood mononuclear cells showed greater differences between patients with impaired fasting glucose or type 2 diabetes and healthy controls than those in plasma.

    Science.gov (United States)

    Kim, Minjoo; Kim, Minkyung; Han, Ji Yun; Lee, Sang-Hyun; Jee, Sun Ha; Lee, Jong Ho

    2017-03-01

    To determine differences between peripheral blood mononuclear cells and the plasma metabolites in patients with impaired fasting glucose or type 2 diabetes and healthy controls. In all, 65 nononobese patients (aged 30-70 years) with impaired fasting glucose or type 2 diabetes and 65 nonobese sex-matched healthy controls were included, and fasting peripheral blood mononuclear cell and plasma metabolomes were profiled. The diabetic or impaired fasting glucose patients showed higher circulating and peripheral blood mononuclear cell lipoprotein phospholipase A 2 activities, high-sensitivity C-reactive protein and tumour necrosis factor-α than controls. Compared with controls, impaired fasting glucose or diabetic subjects showed increases in 11 peripheral blood mononuclear cell metabolites: six amino acids (valine, leucine, methionine, phenylalanine, tyrosine and tryptophan), l-pyroglutamic acid, two fatty acid amides containing palmitic amide and oleamide and two lysophosphatidylcholines. In impaired fasting glucose or diabetic patients, peripheral blood mononuclear cell lipoprotein phospholipase A 2 positively associated with peripheral blood mononuclear cell lysophosphatidylcholines and circulating inflammatory markers, including tumour necrosis factor-α, high-sensitivity C-reactive protein and lipoprotein phospholipase A 2 activities. In plasma metabolites between patients and healthy controls, we observed significant increases in only three amino acids (proline, valine and leucine) and decreases in only five lysophosphatidylcholines. This study demonstrates significant differences in the peripheral blood mononuclear cell metabolome in patients with impaired fasting glucose or diabetes compared with healthy controls. These differences were greater than those observed in the plasma metabolome. These data suggest peripheral blood mononuclear cells as a useful tool to better understand the inflammatory pathophysiology of diabetes.

  12. Inactivated poliovirus vaccine given alone or in a sequential schedule with bivalent oral poliovirus vaccine in Chilean infants: a randomised, controlled, open-label, phase 4, non-inferiority study.

    Science.gov (United States)

    O'Ryan, Miguel; Bandyopadhyay, Ananda S; Villena, Rodolfo; Espinoza, Mónica; Novoa, José; Weldon, William C; Oberste, M Steven; Self, Steve; Borate, Bhavesh R; Asturias, Edwin J; Clemens, Ralf; Orenstein, Walter; Jimeno, José; Rüttimann, Ricardo; Costa Clemens, Sue Ann

    2015-11-01

    Bivalent oral poliovirus vaccine (bOPV; types 1 and 3) is expected to replace trivalent OPV (tOPV) globally by April, 2016, preceded by the introduction of at least one dose of inactivated poliovirus vaccine (IPV) in routine immunisation programmes to eliminate vaccine-associated or vaccine-derived poliomyelitis from serotype 2 poliovirus. Because data are needed on sequential IPV-bOPV schedules, we assessed the immunogenicity of two different IPV-bOPV schedules compared with an all-IPV schedule in infants. We did a randomised, controlled, open-label, non-inferiority trial with healthy, full-term (>2·5 kg birthweight) infants aged 8 weeks (± 7 days) at six well-child clinics in Santiago, Chile. We used supplied lists to randomly assign infants (1:1:1) to receive three polio vaccinations (IPV by injection or bOPV as oral drops) at age 8, 16, and 24 weeks in one of three sequential schedules: IPV-bOPV-bOPV, IPV-IPV-bOPV, or IPV-IPV-IPV. We did the randomisation with blocks of 12 stratified by study site. All analyses were done in a masked manner. Co-primary outcomes were non-inferiority of the bOPV-containing schedules compared with the all-IPV schedule for seroconversion (within a 10% margin) and antibody titres (within two-thirds log2 titres) to poliovirus serotypes 1 and 3 at age 28 weeks, analysed in the per-protocol population. Secondary outcomes were seroconversion and titres to serotype 2 and faecal shedding for 4 weeks after a monovalent OPV type 2 challenge at age 28 weeks. Safety analyses were done in the intention-to-treat population. This trial is registered with ClinicalTrials.gov, number NCT01841671, and is closed to new participants. Between April 25 and August 1, 2013, we assigned 570 infants to treatment: 190 to IPV-bOPV-bOPV, 192 to IPV-IPV-bOPV, and 188 to IPV-IPV-IPV. 564 (99%) were vaccinated and included in the intention-to-treat cohort, and 537 (94%) in the per-protocol analyses. In the IPV-bOPV-bOPV, IPV-IPV-bOPV, and IPV-IPV-IPV groups

  13. HYC-24L Demonstrates Greater Effectiveness With Less Pain Than CPM-22.5 for Treatment of Perioral Lines in a Randomized Controlled Trial.

    Science.gov (United States)

    Butterwick, Kimberly; Marmur, Ellen; Narurkar, Vic; Cox, Sue Ellen; Joseph, John H; Sadick, Neil S; Tedaldi, Ruth; Wheeler, Sarah; Kolodziejczyk, Julia K; Gallagher, Conor J

    2015-12-01

    This trial compares the effectiveness and safety of HYC-24L (Juvéderm Ultra XC; Allergan plc, Dublin, Ireland) (24 mg/mL of hyaluronic acid, 0.3% lidocaine) and CPM-22.5 (Belotero Balance; Merz Aesthetics, Raleigh, NC) (22.5 mg/mL of hyaluronic acid) for the treatment of perioral lines. Men and women aged 35 years or older with moderate-to-severe perioral lines were recruited for this randomized controlled, rater-blinded, 2-arm trial. The primary endpoint was a comparison of rater-assessed responder rates by the validated 4-point Perioral Lines Severity Scale at Month 6; responders were those who showed a ≥1 point improvement. A secondary endpoint was subject-assessed change in perioral lines measured by the Global Assessment of Change Scale. A total of 136 subjects received treatment and 132 completed the trial (mean age: 58 ± 8 years). Total volume injected was 1.18 mL (HYC-24L) and 1.32 mL (CPM-22.5). At Month 6, a significantly greater proportion of HYC-24L subjects responded to treatment (87%) than CPM-22.5 subjects (72%) (p CPM-22.5 subjects, with the greatest difference at Month 6. No unexpected adverse events occurred. HYC-24L subjects showed a higher response rate and a greater improvement in their perioral lines than CPM-22.5 subjects for up to 6 months.

  14. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  15. Voltage Scheduling Droop Control for State-of-Charge Balance of Distributed Energy Storage in DC Microgrids

    DEFF Research Database (Denmark)

    Li, Chendan; Dragicevic, Tomislav; Aldana, Nelson Leonardo Diaz

    2014-01-01

    Due to higher power quality, lower conversion loss, and more DC loads, there has been an increasing awareness on DC microgrid. Previous emphasis has been on equal power sharing among different units in the DC microgrid, while overlooking the coordination of the energy storage units to maintain...... the State-of-Charge balance. In this paper, a new droop method based on voltage scheduling for State-of-Charge balance is proposed to keep the SoC balance for the energy storage units. The proposed method has the advantage of avoiding the stability problem existed in traditional methods based on droop gain...... scheduling. Simulation experiment is taken in Matlab on a DC microgrid with two distributed energy storage units. The simulation results show that the proposed method has successfully achieved SoC balance during the load changes while maintaining the DC bus voltage within the allowable range....

  16. The evaluation of the performance of the automatic exposure control system of some selected mammography facilities in the Greater Accra Region, Ghana

    International Nuclear Information System (INIS)

    Amesimenu, R.

    2013-07-01

    Mammography aids in the early detection of breast cancer. X-rays has an associated risk of inducing cancer though very useful and as such mammography procedures should be optimized through the appropriate processes such as the selection of exposure factors for an optimum image and minimal dose to patients. The automatic exposure control (AEC) aids in the selection of exposure factors thus controlling the amount of radiation to the breast and automatically compensates for differences in the breast thickness and density. The performance of the automatic exposure control system of mammography equipment and the status of quality management systems including quality assurance and quality controls of four (4) mammography facilities within the Greater Accra Region were assessed. In assessing the performance of the automatic exposure control system, the short term reproducibility test, thickness and voltage compensation test were carried out using breast equivalent phantom of various thicknesses. Half value layer test, film reject analysis and patient dose assessment were also performed. Analysis of the responses of the questionnaire administered to radiographers and supervisors of the selected facilities revealed that three (3) of the facilities have some aspect of quality management system programme in place but not effectively implemented. Measured optical densities from the various tests performed to evaluate the performance of the automatic exposure control systems revealed that the AEC compensates for the different phantom thickness and tube voltage (KV) by producing comparable optical densities for the various phantom thickness and tube voltages. Some of the measured optical densities were within the recommended optical density range of 1.5 OD - 1.9 OD. The highest optical density value was 0.13 OD above the highest limit of 1.9 OD. The film reject analysis showed that patient motion accounted for the large part (28%) of film rejects. Other factors such as too light

  17. Scheduling Diet for Diabetes Mellitus Patients using Genetic Algorithm

    Science.gov (United States)

    Syahputra, M. F.; Felicia, V.; Rahmat, R. F.; Budiarto, R.

    2017-01-01

    Diabetes Melitus (DM) is one of metabolic diseases which affects on productivity and lowers the human resources quality. This disease can be controlled by maintaining and regulating balanced and healthy lifestyle especially for daily diet. However, nowadays, there is no system able to help DM patient to get any information of proper diet. Therefore, an approach is required to provide scheduling diet every day in a week with appropriate nutrition for DM patients to help them regulate their daily diet for healing this disease. In this research, we calculate the number of caloric needs using Harris-Benedict equation and propose genetic algorithm for scheduling diet for DM patient. The results show that the greater the number of individuals, the greater the more the possibility of changes in fitness score approaches the best fitness score. Moreover, the greater the created generation, the more the opportunites to obtain best individual with fitness score approaching 0 or equal to 0.

  18. Short-term additional enfuvirtide therapy is associated with a greater immunological recovery in HIV very late presenters: a controlled pilot study.

    Science.gov (United States)

    Bonora, S; Calcagno, A; Cometto, C; Fontana, S; Aguilar, D; D'Avolio, A; Gonzalez de Requena, D; Maiello, A; Dal Conte, I; Lucchini, A; Di Perri, G

    2012-02-01

    To evaluate whether the addition of enfuvirtide to standard highly active antiretroviral therapy (HAART) could confer immunovirological benefits in human immunodeficiency virus (HIV)-infected very late presenters. The current study is an open comparative therapeutic trial of standard protease inhibitor (PI)-based HAART ± additional enfuvirtide in treatment-naïve deeply immunologically impaired HIV-positive patients. Very late presenters (CD4 HIV RNA was intensively monitored in the first month, and, thereafter, monthly, as for CD4+ cell count and percentage, clinical data, and plasma drug concentrations. Of 22 enrolled patients (11 per arm), 19 completed the study (10 in the ENF arm). Baseline CD4+ cell counts and % were comparable, with 20 CD4+/mm(3) (12-37) and a percentage of 3.3 (1.7-7.1) in the ENF arm, and 16 CD4+/mm(3) (9-29) and a percentage of 3.1 (2.3-3.8) in the CO arm, respectively. The baseline viral load was also comparable between the two arms, with 5.77 log10 (5.42-6) and 5.39 log10 (5.06-6) in the ENF and CO arms, respectively. Enfuvirtide recipients had higher CD4+ percentage at week 8 (7.6 vs. 3.6%, p = 0.02) and at week 24 (10.7 vs. 5.9%, p = 0.02), and a greater CD4+ increase at week 24 (207 vs. 134 cells/mm(3), p = 0.04), with 70% of enfuvirtide intakers versus 12.5% of controls who achieved a CD4+ cell count >200/mm(3) (p = 0.01). At 48 weeks, patients in the ENF arm had CD4+ cell counts higher than controls (251 vs. 153cells/mm(3), p = 0.04) and were also found to be faster in reaching a CD4 cell count over 200/mm(3): 18 (8-24) versus 48 (36-108) weeks (p = 0.01). Viral load decay at week 4 was greater in the ENF arm (-3 vs. -2.2 log, p = 0.04), while the proportion of patients with viral load discovered HIV-positive patients with very low CD4+ cell counts. Induction strategies using an enfuvirtide-based approach in such subjects warrant further investigation.

  19. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  20. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  1. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  2. Colorado SIP: 5 CCR 1001-13, Reg 11, Motor Vehicle Emissions Inspection Program—Part A, General Provisions, Area of Applicability, Schedules for Obtaining Certification of Emissions Control, Definitions, Exemptions, and Clean Screening/Remote Sensing

    Science.gov (United States)

    Colorado SIP: 5 CCR 1001-13, Reg 11, Motor Vehicle Emissions Inspection Program—Part A, General Provisions, Area of Applicability, Schedules for Obtaining Certification of Emissions Control, Definitions, Exemptions, and Clean Screening/Remote Sensing

  3. Occupational dust exposure and head and neck squamous cell carcinoma risk in a population-based case–control study conducted in the greater Boston area

    International Nuclear Information System (INIS)

    Langevin, Scott M; McClean, Michael D; Michaud, Dominique S; Eliot, Melissa; Nelson, Heather H; Kelsey, Karl T

    2013-01-01

    Head and neck cancers account for an estimated 549,000 global cancer diagnoses each year. While tobacco use, alcohol consumption, and HPV16 infection are considered to be the major risk factors for this disease, occupational risk factors, including exposure to asbestos, have also been described, although dust exposures other than asbestos have been historically understudied. We have investigated the relationship between occupational exposures to five types of dusts, including sawdust, concrete dust, leather dust, metal dust, and chimney soot, and head and neck squamous cell carcinomas (HNSCC) in the greater Boston area. We report findings from a population-based case–control study involving 951 incident HNSCC cases and 1193 controls, frequency matched on age (±3 years), sex, and town/neighborhood of residence. Multivariable logistic regression was used to assess the association between occupational exposure to each type of dust and HNSCC, overall and by primary tumor site. After adjusting for age, sex, race, smoking, alcohol consumption, education, and HPV16 serology, laryngeal carcinoma risk increased for each decade of occupational exposure to sawdust (OR = 1.2, 95% CI: 1.0, 1.3) and metal dust (OR = 1.2, 95% CI: 1.0, 1.4); and HNSCC risk increased for each decade of occupational leather dust exposure (OR = 1.5, 95% CI: 1.2, 1.9). We have provided evidence for an association between occupational sawdust and metal dust and laryngeal squamous cell carcinoma, and leather dust and HNSCC, with increasing risk with longer duration at the exposed occupation

  4. Occupational dust exposure and head and neck squamous cell carcinoma risk in a population-based case-control study conducted in the greater Boston area.

    Science.gov (United States)

    Langevin, Scott M; McClean, Michael D; Michaud, Dominique S; Eliot, Melissa; Nelson, Heather H; Kelsey, Karl T

    2013-12-01

    Head and neck cancers account for an estimated 549,000 global cancer diagnoses each year. While tobacco use, alcohol consumption, and HPV16 infection are considered to be the major risk factors for this disease, occupational risk factors, including exposure to asbestos, have also been described, although dust exposures other than asbestos have been historically understudied. We have investigated the relationship between occupational exposures to five types of dusts, including sawdust, concrete dust, leather dust, metal dust, and chimney soot, and head and neck squamous cell carcinomas (HNSCC) in the greater Boston area. We report findings from a population-based case-control study involving 951 incident HNSCC cases and 1193 controls, frequency matched on age (±3 years), sex, and town/neighborhood of residence. Multivariable logistic regression was used to assess the association between occupational exposure to each type of dust and HNSCC, overall and by primary tumor site. After adjusting for age, sex, race, smoking, alcohol consumption, education, and HPV16 serology, laryngeal carcinoma risk increased for each decade of occupational exposure to sawdust (OR = 1.2, 95% CI: 1.0, 1.3) and metal dust (OR = 1.2, 95% CI: 1.0, 1.4); and HNSCC risk increased for each decade of occupational leather dust exposure (OR = 1.5, 95% CI: 1.2, 1.9). We have provided evidence for an association between occupational sawdust and metal dust and laryngeal squamous cell carcinoma, and leather dust and HNSCC, with increasing risk with longer duration at the exposed occupation. © 2013 The Authors. Cancer Medicine published by John Wiley & Sons Ltd.

  5. Optimization of Factors Affecting Beauveria bassiana Fungus Ability in Control of Greater Wax Moth (Galleria mellonella L. by Response Surface Method

    Directory of Open Access Journals (Sweden)

    Ali Heidari

    2017-03-01

    Full Text Available Introduction: Stored product pests are a major problem in the storage of agricultural products that cause damage from harvest until consumption. Greater Wax Moth (Galleria mellonella L. is one of the most important pests of stored products and beehives. The most common method to control this pest in many countries is use of chemical compounds. However, these compounds have disadvantages such as pesticide residues in wax, the development of resistance in pest and irreversible effects on the environment and humans. The use of insect pathogenic fungi due to its low risk on mammals and natural enemies can be a good alternative to conventional chemical pesticides. Response surface methodology (RSM is a statistical technique that is employed to optimize processes that are affected by several variables. This technique uses regression analysis to obtain optimal equations to estimate the values. Using this method, while maintaining the quality in the experiments, the number of those could be reduced. Therefore, this study was aimed to evaluate response surface methodology to determine the effect of optimum lethal level of concentration of B. bassiana conidia, temperature as well as humidity variables on the mortality of fifth instar larvae of greater wax moth. Materials and Methods: Wax moth-eating insects were raised in plastic containers containing artificial food and old black wax at 30 ± 1 ° C and a relative humidity of 85 ± 1 % and photoperiod of 14:10 h (L: D. Isolation of insect pathogenic fungus B. bassiana was done by using Galleria Bait Method (GBM. For this purpose, after preparation of the fungus suspension from the infected larvae, 1 ml volume of the suspension was transferred to the water-agar 1.2% and then sealed petri dishes incubated at 30 ° C for three days. After identifying the single colony and formation of pure isolates, microscopic slides were prepared and eventually recovered isolates were recognized as B. bassiana. The

  6. The influence of intermittent fasting on the circadian pattern of melatonin while controlling for caloric intake, energy expenditure, light exposure, and sleep schedules: A preliminary report.

    Science.gov (United States)

    Almeneessier, Aljohara S; Bahammam, Ahmed S; Sharif, Munir M; Bahammam, Salman A; Nashwan, Samar Z; Pandi Perumal, Seithikurippu R; Cardinali, Daniel P; Alzoghaibi, Mohammad

    2017-01-01

    We hypothesized that if we control for food composition, caloric intake, light exposure, sleep schedule, and exercise, intermittent fasting would not influence the circadian pattern of melatonin. Therefore, we designed this study to assess the effect of intermittent fasting on the circadian pattern of melatonin. Eight healthy volunteers with a mean age of 26.6 ± 4.9 years and body mass index of 23.7 ± 3.5 kg/m 2 reported to the Sleep Disorders Center (the laboratory) on four occasions: (1) adaptation, (2) 4 weeks before Ramadan while performing Islamic intermittent fasting for 1 week (fasting outside Ramadan [FOR]), (3) 1 week before Ramadan (nonfasting baseline [BL]), and (4) during the 2 nd week of Ramadan while fasting ( Ramadan ). The plasma levels of melatonin were measured using enzyme-linked immunoassays at 22:00, 02:00, 04:00, 06:00, and 11:00 h. The light exposure, meal composition, energy expenditure, and sleep schedules remained the same while the participants stayed at the laboratory. The melatonin levels followed the same circadian pattern during the three monitoring periods (BL, FOR, and Ramadan ). The peak melatonin level was at 02:00 h and the trough level was at 11:00 h in all studied periods. Lower melatonin levels at 22:00 h were found during fasting compared to BL. Cosinor analysis revealed no significant changes in the acrophase of melatonin levels. In this preliminary report, under controlled conditions of light exposure, meal composition, energy expenditure, and sleep-wake schedules, intermittent fasting has no significant influence on the circadian pattern of melatonin.

  7. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different....... Compared to the predictions of an analyst observing untolled equilibrium and taking scheduling preferences as exogenous, we find that both the optimal capacity and the marginal external cost of congestion have changed. The benefits of tolling are greater, and the optimal time varying toll is different....

  8. Greater autonomy at work

    NARCIS (Netherlands)

    Houtman, I.L.D.

    2004-01-01

    In the past 10 years, workers in the Netherlands increasingly report more decision-making power in their work. This is important for an economy in recession and where workers face greater work demands. It makes work more interesting, creates a healthier work environment, and provides opportunities

  9. Counting the minutes: administrative control of work schedules and time management of secondary school teachers in Québec.

    Science.gov (United States)

    Riel, Jessica; Messing, Karen

    2011-01-01

    Québec teachers have been identified as having a high level of stress and having difficulties with work-family balancing (WFB). An analysis of their work activity was done to identify task elements that could be changed. Work of 15 teachers was observed and 20 other teachers were interviewed. Ergonomic analysis, a mixed method that combines qualitative analysis with some quantitative data: 87 hours' observation; 15 interviews. Environmental parameters were recorded in 8 classrooms and in two faculty workrooms. Working postures were recorded. Teachers were subject to numerous demands in an often inadequate environment. A new management practice required teachers to spend 300 min/week outside class but in school, where their work could be monitored. The timed and scheduled tasks could not be done in the rooms provided due to overcrowding, inadequate physical environment, and lack of access to computers and telephones. Time at home decreased but work done at home did not. The physical environment of teaching impacts teaching activity. Work organization that treats a complex, results-oriented task as if it could be well represented by the number of supervised minutes spent on it can be problematic. WFB should be considered when work is re-organized.

  10. TCSC control structures for line power scheduling and methods to determine their location and tuning to damp system oscillations

    Energy Technology Data Exchange (ETDEWEB)

    Martins, N; Pinto, H J.C.P.; Bianco, A [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Macedo, N J.P. [FURNAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper describes control structures and computer methods to enhance the practical use of thyristor controlled series compensation (TCSC) in power systems. The location and controller design of the TCS devices, to damp system oscillations, are based on modal analysis and frequency response techniques, respectively. Results are given for a large practical power system. (author) 15 refs., 18 figs., 5 tabs.

  11. A Randomized, Controlled Study of DTaP-IPV-HB-PRP-T, a Fully Liquid Hexavalent Vaccine, Administered in a 3-, 5- and 11- to 12-month Schedule.

    Science.gov (United States)

    Vesikari, Timo; Silfverdal, Sven-Arne; Jordanov, Emilia; Feroldi, Emmanuel

    2017-01-01

    To assess the immunogenicity and safety of a fully liquid, ready-to-use hexavalent DTaP-IPV-HB-PRP-T vaccine when administered in a 2 + 1 schedule at 3, 5 and 11-12 months of age. Phase III, randomized, active-controlled, observer-blind, multicenter study. Infants were randomized to receive DTaP-IPV-HB-PRP-T (N = 275) or a licensed control hexavalent vaccine (DTaP-IPV-HB//PRP~T: N = 275), both given in coadministration with Prevenar 13. Serum was analyzed for immune responses to all vaccine antigens. Noninferiority of DTaP-IPV-HB-PRP-T to the control vaccine was tested at completion of the primary series using predefined seroprotection (SP) rate and vaccine response (VR) rates. Safety was assessed using parental reports. Noninferiority of DTaP-IPV-HB-PRP-T to the control vaccine was demonstrated postdose 3 for each antigen, and the SP (for D, T, poliovirus 1, 2 and 3, hepatitis B and polyribosylribitol phosphate) and VR rates (for pertussis toxin and filamentous hemagglutinin) were high in each group. SP rates for D, T, polio 1, 2, 3 and VR rates for pertussis toxin and filamentous hemagglutinin were similar in each group. For hepatitis B, SP rate was slightly higher for DTaP-IPV-HB//PRP~T (99.6%) than DTaP-IPV-HB-PRP-T (96.4%), and for PRP, SP rate was higher for DTaP-IPV-HB-PRP-T (93.5%) than DTaP-IPV-HB//PRP~T (85.2%). For Prevenar 13, the SP rate was high for each serotype and similar for both groups. All vaccines were well tolerated. These study findings confirm the safety and immunogenicity and thus the suitability of this fully liquid hexavalent vaccine for administration in a 2 + 1 schedule.

  12. Putting ROSE to Work: A Proposed Application of a Request-Oriented Scheduling Engine for Space Station Operations

    Science.gov (United States)

    Jaap, John; Muery, Kim

    2000-01-01

    Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.

  13. Scheduling of Domestic Water Heater Power Demand for Maximizing PV Self-Consumption Using Model Predictive Control

    DEFF Research Database (Denmark)

    Sossan, Fabrizio; Kosek, Anna Magdalena; Martinenas, Sergejus

    2013-01-01

    This paper presents a model predictive control (MPC) strategy for maximizing photo-voltaic (PV) selfconsumption in a household context exploiting the flexible demand of an electric water heater. The predictive controller uses a water heater model and forecast of the hot Water consumption in order...... to predict the future temperature of the water and it manages its state (on and off) according to the forecasted PV production, which are computed starting from forecast of the solar irradiance. Simulations for the proof of concept and for validating the proposed control strategy are proposed. Results...... of the control approach are compared with a traditional thermostatic controller using historical measurements of a 10 kW PV installation. Economic results based on the Italian self consumption tariffs are also reported. The model of the water heater complex is a mixed grey and white box and its parameters have...

  14. Greater-confinement disposal

    International Nuclear Information System (INIS)

    Trevorrow, L.E.; Schubert, J.P.

    1989-01-01

    Greater-confinement disposal (GCD) is a general term for low-level waste (LLW) disposal technologies that employ natural and/or engineered barriers and provide a degree of confinement greater than that of shallow-land burial (SLB) but possibly less than that of a geologic repository. Thus GCD is associated with lower risk/hazard ratios than SLB. Although any number of disposal technologies might satisfy the definition of GCD, eight have been selected for consideration in this discussion. These technologies include: (1) earth-covered tumuli, (2) concrete structures, both above and below grade, (3) deep trenches, (4) augered shafts, (5) rock cavities, (6) abandoned mines, (7) high-integrity containers, and (8) hydrofracture. Each of these technologies employ several operations that are mature,however, some are at more advanced stages of development and demonstration than others. Each is defined and further described by information on design, advantages and disadvantages, special equipment requirements, and characteristic operations such as construction, waste emplacement, and closure

  15. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  16. More features, greater connectivity.

    Science.gov (United States)

    Hunt, Sarah

    2015-09-01

    Changes in our political infrastructure, the continuing frailties of our economy, and a stark growth in population, have greatly impacted upon the perceived stability of the NHS. Healthcare teams have had to adapt to these changes, and so too have the technologies upon which they rely to deliver first-class patient care. Here Sarah Hunt, marketing co-ordinator at Aid Call, assesses how the changing healthcare environment has affected one of its fundamental technologies - the nurse call system, argues the case for wireless such systems in terms of what the company claims is greater adaptability to changing needs, and considers the ever-wider range of features and functions available from today's nurse call equipment, particularly via connectivity with both mobile devices, and ancillaries ranging from enuresis sensors to staff attack alert 'badges'.

  17. Greater oil investment opportunities

    International Nuclear Information System (INIS)

    Arenas, Ismael Enrique

    1997-01-01

    Geologically speaking, Colombia is a very attractive country for the world oil community. According to this philosophy new and important steps are being taken to reinforce the oil sector: Expansion of the exploratory frontier by including a larger number of sedimentary areas, and the adoption of innovative contracting instruments. Colombia has to offer, Greater economic incentives for the exploration of new areas to expand the exploratory frontier, stimulation of exploration in areas with prospectivity for small fields. Companies may offer Ecopetrol a participation in production over and above royalties, without it's participating in the investments and costs of these fields, more favorable conditions for natural gas seeking projects, in comparison with those governing the terms for oil

  18. [Modification of pertussis vaccination schedule in Chile, immunization of special groups and control strategies: Commentary from the Consultive Committee of Immunizations of The Chilean Society of Infectious Diseases].

    Science.gov (United States)

    Potin, Marcela; Cerda, Jaime; Contreras, Lily; Muñoz, Alma; Ripoll, Erna; Vergara, Rodrigo

    2012-06-01

    In Chile, an increased number of notifications of cases of whooping cough was detected at the beginning of October 2010, and maintained through 2012. Accumulated cases during 2011 were 2,581 (15.0 per 100,000), which is greater than the number of cases registered during the period 2008-2010 (2,460 cases). On the other hand, the local sanitary authority introduced a modification of pertussis vaccination schedule (starting 2012), which consists in the replacement of the second booster of pertussis vaccine (DTwP, administered to 4-year-old children) as well as diphtheria-tetanus toxoid (dT, administered to second grade scholars) for an acellular pertussis vaccine with reduced antigenic content (dTpa), which will be administrated to first grade scholars. The Consultive Committee of Immunizations considers that the modification is adequate, since it extends the age of protection, reducing at least in theory the infection in older scholars and adolescents -who are significant sources of transmission of Bordetella pertussis to infants- using an adequate vaccine formulation (acellular pertussis vaccine). The available evidence regarding vaccination in special groups (adolescents and adults, health-care workers and pregnant women) and cocooning strategy are commented.

  19. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  20. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  1. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  2. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  3. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  4. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  5. Evaluation of an every-other-day palonosetron schedule to control emesis in multiple-day high-dose chemotherapy.

    Science.gov (United States)

    Mirabile, Aurora; Celio, Luigi; Magni, Michele; Bonizzoni, Erminio; Gianni, Alessandro Massimo; Di Nicola, Massimo

    2014-12-01

    Efficacy of intermittent palonosetron dosing in patients undergoing multiple-day, high-dose chemotherapy (HDC) was investigated. Fifty-eight patients received palonosetron (0.25 mg intravenous [iv.]) every other day plus daily dexamethasone (8 mg iv. twice daily) dosing. The primary end point was complete control (CC; no emesis, no rescue anti-emetics, and no more than mild nausea) in the overall acute-period (until 24 h after chemotherapy completion). Acute-period CC occurred in 81% and 50% of patients receiving palonosetron and ondansetron (historical control cohort), respectively. Palonosetron (odds ratio [OR]: 4.37; p = 0.001) and a longer duration of HDC regimen (OR: 3.47; p = 0.011) independently predicted a better anti-emetic outcome. Palonosetron every other day plus daily dexamethasone is an effective anti-emetic coverage in patients undergoing HDC.

  6. Influence of titration schedule and maintenance dose on the tolerability of adjunctive eslicarbazepine acetate: An integrated analysis of three randomized placebo-controlled trials.

    Science.gov (United States)

    Krauss, Gregory; Biton, Victor; Harvey, Jay H; Elger, Christian; Trinka, Eugen; Soares da Silva, Patrício; Gama, Helena; Cheng, Hailong; Grinnell, Todd; Blum, David

    2018-01-01

    To examine the influence of titration schedule and maintenance dose on the incidence and type of treatment-emergent adverse events (TEAEs) associated with adjunctive eslicarbazepine acetate (ESL). Data from three randomized, double-blind, placebo-controlled trials were analyzed. Patients with refractory partial-onset seizures were randomized to maintenance doses of ESL 400, 800, or 1200mg QD (dosing was initiated at 400 or 800mg QD) or placebo. The incidence of TEAEs was analyzed during the double-blind period (2-week titration phase; 12-week maintenance phase), according to the randomized maintenance dose and the titration schedule. 1447 patients were included in the analysis. During the first week of treatment, 62% of patients taking ESL 800mg QD had ≥1 TEAE, vs 35% of those taking 400mg QD and 32% of the placebo group; dizziness, somnolence, nausea, and headache were numerically more frequent in patients taking ESL 800mg than those taking ESL 400mg QD. During the double-blind period, the incidences of common TEAEs were lower in patients who initiated ESL at 400mg vs 800mg QD. For the 800 and 1200mg QD maintenance doses, rates of TEAEs leading to discontinuation were lower in patients who began treatment with 400mg than in those who began taking ESL 800mg QD. Initiation of ESL at 800mg QD is feasible. However, initiating treatment with ESL 400mg QD for 1 or 2 weeks is recommended, being associated with a lower incidence of TEAEs, and related discontinuations. For some patients, treatment may be initiated at 800mg QD, if the need for more immediate seizure reduction outweighs concerns about increased risk of adverse reactions during initiation. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  7. No Exacerbation of Knee Joint Pain and Effusion Following Preoperative Progressive Resistance Training in Patients Scheduled for Total Knee Arthroplasty: Secondary Analyses From a Randomized Controlled Trial.

    Science.gov (United States)

    Skoffer, Birgit; Dalgas, Ulrik; Maribo, Thomas; Søballe, Kjeld; Mechlenburg, Inger

    2017-11-09

    Preoperative progressive resistance training (PRT) is controversial in patients scheduled for total knee arthroplasty (TKA), because of the concern that it may exacerbate knee joint pain and effusion. To examine whether preoperative PRT initiated 5 weeks prior to TKA would exacerbate pain and knee effusion, and would allow a progressively increased training load throughout the training period that would subsequently increase muscle strength. Secondary analyses from a randomized controlled trial. University Hospital and a Regional Hospital. A total of 30 patients who were scheduled for TKA due to osteoarthritis and assigned as the intervention group. Patients underwent unilateral PRT (3 sessions per week). Exercise loading was 12 repetitions maximum (RM) with progression toward 8 RM. The training program consisted of 6 exercises performed unilaterally. Before and after each training session, knee joint pain was rated on an 11-point scale, effusion was assessed by measuring the knee joint circumference, and training load was recorded. The first and last training sessions were initiated by 1 RM testing of unilateral leg press, unilateral knee extension, and unilateral knee flexion. The median pain change score from before to after each training session was 0 at all training sessions. The average increase in knee joint effusion across the 12 training sessions was a mean 0.16 cm ± 0.23 cm. No consistent increase in knee joint effusion after training sessions during the training period was found (P = .21). Training load generally increased, and maximal muscle strength improved as follows: unilateral leg press: 18% ± 30% (P = .03); unilateral knee extension: 81% ± 156% (P knee flexion: 53% ± 57% (P knee joint pain and effusion, despite a substantial progression in loading and increased muscle strength. Concerns for side effects such as pain and effusion after PRT seem unfounded. To be determined. Copyright © 2017. Published by Elsevier Inc.

  8. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  9. A randomised, double-blind, placebo-controlled, crossover study to assess the efficacy and safety of three dosing schedules of agalsidase alfa enzyme replacement therapy for Fabry disease.

    Science.gov (United States)

    Hughes, D A; Deegan, P B; Milligan, A; Wright, N; Butler, L H; Jacobs, A; Mehta, A B

    2013-07-01

    Anecdotal reports suggest that the currently approved dosing interval of agalsidase alfa (0.2 mg/kg/2 weeks) for Fabry disease treatment is too long. This randomised, double-blind, placebo-controlled, crossover study investigated three altered dosing intervals. 18 Fabry patients received three agalsidase alfa dosing schedules, each for four weeks (A: 0.2 mg/kg∗2 weeks, B: 0.1 mg/kg/week, C: 0.2 mg/kg/week). Health state, pain levels, sweat volume and latency and plasma and urinary globotriaosylceramide levels were recorded throughout the study. No significant differences were found among the schedules for the primary efficacy outcome of self-assessed health state, or for pain scores. A trend toward increased sweat volume on QSART testing, and reduced urine globotriaosylceramide concentration were seen with treatment schedule C. Agalsidase alfa was safe and well tolerated with all schedules. In conclusion, the primary analyses did not find weekly infusions of agalsidase alfa to be statistically better than the approved dosing schedule however the data indicates that further studies with more patients over a longer period are required to more accurately determine the optimum dose and schedule. Copyright © 2013 Elsevier Inc. All rights reserved.

  10. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  11. The Air Traffic Controller Work-Shift Scheduling Problem in Spain from a Multiobjective Perspective: A Metaheuristic and Regular Expression-Based Approach

    Directory of Open Access Journals (Sweden)

    Faustino Tello

    2018-01-01

    Full Text Available We address an air traffic control operator (ATCo work-shift scheduling problem. We consider a multiple objective perspective where the number of ATCos is fixed in advance and a set of ATCo labor conditions have to be satisfied. The objectives deal with the ATCo work and rest periods and positions, the structure of the solution, the number of control center changes, or the distribution of the ATCo workloads. We propose a three-phase problem-solving methodology. In the first phase, a heuristic is used to derive infeasible initial solutions on the basis of templates. Then, a multiple independent run of the simulated annealing metaheuristic is conducted aimed at reaching feasible solutions in the second phase. Finally, a multiple independent simulated annealing run is again conducted from the initial feasible solutions to optimize the objective functions. To do this, we transform the multiple to single optimization problem by using the rank-order centroid function. In the search processes in phases 2 and 3, we use regular expressions to check the ATCo labor conditions in the visited solutions. This provides high testing speed. The proposed approach is illustrated using a real example, and the optimal solution which is reached outperforms an existing template-based reference solution.

  12. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  13. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  14. Cognitive control over visual food cue saliency is greater in reduced-overweight/obese but not in weight relapsed women: An EEG study.

    Science.gov (United States)

    Hume, David John; Howells, Fleur Margaret; Karpul, David; Rauch, H G Laurie; Kroff, Jacolene; Lambert, Estelle Victoria

    2015-12-01

    Poor weight management may relate to a reduction in neurobehavioural control over food intake and heightened reactivity of the brain's neural reward pathways. Here we explore the neurophysiology of food-related visual cue processing in weight reduced and weight relapsed women by assessing differences in cortical arousal and attentional processing using a food-Stroop paradigm. 51 women were recruited into 4 groups: reduced-weight participants (RED, n=14) compared to BMI matched low-weight controls (LW-CTL, n=18); and weight relapsed participants (REL, n=10) compared to BMI matched high-weight controls (HW-CTL, n=9). Eating behaviour and body image questionnaires were completed. Two Stroop tasks (one containing food images, the other containing neutral images) were completed with record of electroencephalography (EEG). Differences in cortical arousal were found in RED versus LW-CTL women, and were seen during food task execution only. Compared to their controls, RED women exhibited lower relative delta band power (p=0.01) and higher relative beta band power (p=0.01) over the right frontal cortex (F4). Within the RED group, delta band oscillations correlated positively with self-reported habitual fat intake and with body shape dissatisfaction. As compared to women matched for phenotype but with no history of weight reduction, reduced-overweight/obese women show increased neurobehavioural control over external food cues and the inhibition of reward-orientated feeding responses. Insight into these self-regulatory mechanisms which attenuate food cue saliency may aid in the development of cognitive remediation therapies which facilitate long-term weight loss. Copyright © 2015 Elsevier Ltd. All rights reserved.

  15. Physical Activity Might Be of Greater Importance for Good Spinal Control Than If You Have Had Pain or Not: A Longitudinal Study.

    Science.gov (United States)

    Aasa, Ulrika; Lundell, Sara; Aasa, Björn; Westerståhl, Maria

    2015-12-01

    Longitudinal design. A cohort followed in 3 waves of data collection. The aim of the study was to describe the relationships between the performance of 2 tests of spinal control at the age of 52 years and low back pain, physical activity level, and fitness earlier in life, as well as to describe the cross-sectional relationships between these measures. Altered spinal control has been linked to pain; however, other stimuli may also lead to inability to control the movements of the spine. Participants answered questions about physical activity and low back pain, and performed physical fitness tests at the age of 16, 34, and 52 years. The fitness test battery included tests of endurance in the back and abdominal muscles, a submaximal bicycle ergometer test to estimate maximal oxygen uptake, and measurements of hip flexion, thoracic spine flexibility, and anthropometrics. Two tests were aggregated to a physical fitness index. At the age of 52, also 2 tests of spinal control, the standing Waiter's bow (WB) and the supine double leg lower (LL) were performed. Logistic regression analyses showed that higher back muscle endurance at the age of 34 years could positively predict WB performance at 52 years and higher physical fitness at the age of 34 could positively predict LL performance at 52 years. Regarding cross-sectional relationships, an inability to perform the WB correctly was associated with lower physical fitness, flexibility and physical activity, and larger waist circumference. An inability to correctly perform the LL was associated with lower physical fitness. One-year prevalence of pain was not significantly associated with WB or LL test performance. An active life resulting in higher physical fitness is related to better spinal control in middle-aged men and women. This further strengthens the importance of physical activity throughout the life span. 3.

  16. User Experience May be Producing Greater Heart Rate Variability than Motor Imagery Related Control Tasks during the User-System Adaptation in Brain-Computer Interfaces

    Science.gov (United States)

    Alonso-Valerdi, Luz M.; Gutiérrez-Begovich, David A.; Argüello-García, Janet; Sepulveda, Francisco; Ramírez-Mendoza, Ricardo A.

    2016-01-01

    Brain-computer interface (BCI) is technology that is developing fast, but it remains inaccurate, unreliable and slow due to the difficulty to obtain precise information from the brain. Consequently, the involvement of other biosignals to decode the user control tasks has risen in importance. A traditional way to operate a BCI system is via motor imagery (MI) tasks. As imaginary movements activate similar cortical structures and vegetative mechanisms as a voluntary movement does, heart rate variability (HRV) has been proposed as a parameter to improve the detection of MI related control tasks. However, HR is very susceptible to body needs and environmental demands, and as BCI systems require high levels of attention, perceptual processing and mental workload, it is important to assess the practical effectiveness of HRV. The present study aimed to determine if brain and heart electrical signals (HRV) are modulated by MI activity used to control a BCI system, or if HRV is modulated by the user perceptions and responses that result from the operation of a BCI system (i.e., user experience). For this purpose, a database of 11 participants who were exposed to eight different situations was used. The sensory-cognitive load (intake and rejection tasks) was controlled in those situations. Two electrophysiological signals were utilized: electroencephalography and electrocardiography. From those biosignals, event-related (de-)synchronization maps and event-related HR changes were respectively estimated. The maps and the HR changes were cross-correlated in order to verify if both biosignals were modulated due to MI activity. The results suggest that HR varies according to the experience undergone by the user in a BCI working environment, and not because of the MI activity used to operate the system. PMID:27458384

  17. Research and implementation of novel approaches for the control of nematode parasites in Latin America and the Caribbean: is there sufficient incentive for a greater extension effort?

    Science.gov (United States)

    Torres-Acosta, J F J; Molento, M; Mendoza de Gives, P

    2012-05-04

    The widespread presence of anthelmintic resistant gastrointestinal parasitic nematodes in outdoor ruminant production systems has driven the need to identify and develop novel approaches for the control of helminths with the intention to reduce the dependence on commercial anthelmintic drugs. This paper identifies what has been done in Latin America (LA) in terms of estimating the prevalence of anthelmintic resistance (AR) in ruminant production systems and the application of different novel approaches for the control of helminths in those systems, including research and extension activities. Firstly, the paucity of knowledge of AR is discussed in the context of different countries, as well as, the available economic resources for research, the technical infrastructure available and the practical difficulties of the production systems. It is then proposed that the search for novel approaches is not only driven by AR but also by the need for techniques that are feasible for application by resource-poor farmers in non-commercial subsistence farming systems. However, the commercial benefits of these approaches are often limited and so are funding inputs in most countries. The workers participating in the research into different novel approaches are identified as well as the different methods being studied in the different areas of LA according to their published results. In addition, the difficulties experienced during extension efforts to reach farmers and help them to adopt novel approaches for the control of parasitic nematodes in LA are discussed. The role of regulatory authorities in these countries is discussed as some methods of control might need an official confirmation of their efficacy as well as authorization prior to application as they may affect animal products (i.e. residues) and/or impose a hazard for animal welfare. The role of the pharmaceutical companies is also discussed. Copyright © 2011. Published by Elsevier B.V.

  18. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  19. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  20. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  1. Reduction of emission level in approach signals of greater mouse-eared bats (Myotis myotis): No evidence for a closed loop control system for intensity compensation.

    Science.gov (United States)

    Budenz, Tobias; Denzinger, Annette; Schnitzler, Hans-Ulrich

    2018-01-01

    Bats lower the emission SPL when approaching a target. The SPL reduction has been explained by intensity compensation which implies that bats adjust the emission SPL to perceive the retuning echoes at the same level. For a better understanding of this control mechanism we recorded the echolocation signals of four Myotis myotis with an onboard microphone when foraging in the passive mode for rustling mealworms offered in two feeding dishes with different target strength, and determined the reduction rate for the emission SPL and the increase rate for the SPL of the returning echoes. When approaching the dish with higher target strength bats started the reduction of the emission SPL at a larger reaction distance (1.05 ± 0.21 m) and approached it with a lower reduction rate of 7.2 dB/halving of distance (hd), thus producing a change of echo rate at the ears of + 4 dB/hd. At the weaker target reaction distance was shorter (0.71 ± 0.24 m) and the reduction rate (9.1 dB/hd) was higher, producing a change of echo rate of-1.2 dB/hd. Independent of dish type, bats lowered the emission SPL by about 26 dB on average. In one bat where the echo SPL from both targets could be measured, the reduction of emission SPL was triggered when the echo SPL surpassed a similar threshold value around 41-42 dB. Echo SPL was not adjusted at a constant value indicating that Myotis myotis and most likely all other bats do not use a closed loop system for intensity compensation when approaching a target of interest. We propose that bats lower the emission SPL to adjust the SPL of the perceived pulse-echo-pairs to the optimal auditory range for the processing of range information and hypothesize that bats use flow field information not only to control the reduction of the approach speed to the target but also to control the reduction of emission SPL.

  2. Survey Email Scheduling and Monitoring in eRCTs (SESAMe): A Digital Tool to Improve Data Collection in Randomized Controlled Clinical Trials.

    Science.gov (United States)

    Skonnord, Trygve; Steen, Finn; Skjeie, Holgeir; Fetveit, Arne; Brekke, Mette; Klovning, Atle

    2016-11-22

    Electronic questionnaires can ease data collection in randomized controlled trials (RCTs) in clinical practice. We found no existing software that could automate the sending of emails to participants enrolled into an RCT at different study participant inclusion time points. Our aim was to develop suitable software to facilitate data collection in an ongoing multicenter RCT of low back pain (the Acuback study). For the Acuback study, we determined that we would need to send a total of 5130 emails to 270 patients recruited at different centers and at 19 different time points. The first version of the software was tested in a pilot study in November 2013 but was unable to deliver multiuser or Web-based access. We resolved these shortcomings in the next version, which we tested on the Web in February 2014. Our new version was able to schedule and send the required emails in the full-scale Acuback trial that started in March 2014. The system architecture evolved through an iterative, inductive process between the project study leader and the software programmer. The program was tested and updated when errors occurred. To evaluate the development of the software, we used a logbook, a research assistant dialogue, and Acuback trial participant queries. We have developed a Web-based app, Survey Email Scheduling and Monitoring in eRCTs (SESAMe), that monitors responses in electronic surveys and sends reminders by emails or text messages (short message service, SMS) to participants. The overall response rate for the 19 surveys in the Acuback study increased from 76.4% (655/857) before we introduced reminders to 93.11% (1149/1234) after the new function (P<.001). Further development will aim at securing encryption and data storage. The SESAMe software facilitates consecutive patient data collection in RCTs and can be used to increase response rates and quality of research, both in general practice and in other clinical trial settings. ©Trygve Skonnord, Finn Steen, Holgeir

  3. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  4. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  5. Alternative Work Schedules Increase Employee Satisfaction.

    Science.gov (United States)

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  6. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  7. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  8. Lift scheduling organization : Lift Concept for Lemminkainen

    OpenAIRE

    Mingalimov, Iurii

    2015-01-01

    The purpose of the work was to make a simple schedule for the main contractors and clients to check and control workflow connected with lifts. It gathers works with electricity, construction, engineering networks, installing equipment and commissioning works. The schedule was carried out during working on the building site Aino in Saint Petersburg in Lemminkӓinen. The duration of work was 5 months. The lift concept in Lemminkӓinen is very well controlled in comparison with other buil...

  9. 33 CFR 401.58 - Pleasure craft scheduling.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pleasure craft scheduling. 401.58... OF TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.58 Pleasure craft scheduling. (a) The transit of pleasure craft shall be scheduled by the traffic controller or the officer in...

  10. 21 CFR 113.83 - Establishing scheduled processes.

    Science.gov (United States)

    2010-04-01

    ... commercial production runs should be determined on the basis of recognized scientific methods to be of a size... CONTAINERS Production and Process Controls § 113.83 Establishing scheduled processes. Scheduled processes for... production shall be adequately provided for in establishing the scheduled process. Critical factors, e.g...

  11. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  12. Group Elevator Peak Scheduling Based on Robust Optimization Model

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2013-08-01

    Full Text Available Scheduling of Elevator Group Control System (EGCS is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is realized without getting exact numbers of each calling floor's waiting passengers. Specifically, energy-saving oriented multi-objective scheduling price is proposed, RO uncertain peak scheduling model is built to minimize the price. Because RO uncertain model could not be solved directly, RO uncertain model is transformed to RO certain model by elevator scheduling robust counterparts. Because solution space of elevator scheduling is enormous, to solve RO certain model in short time, ant colony solving algorithm for elevator scheduling is proposed. Based on the algorithm, optimal scheduling solutions are found quickly, and group elevators are scheduled according to the solutions. Simulation results show the method could improve scheduling performances effectively in peak pattern. Group elevators' efficient operation is realized by the RO scheduling method.

  13. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  14. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  15. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  16. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  17. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  18. CERN confirms LHC schedule

    CERN Document Server

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  19. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  20. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  1. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  2. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  3. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  4. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  5. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  6. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  7. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  8. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  9. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  10. Initial examination of the effects of overtime and shift scheduling on nuclear power plant safety performance

    International Nuclear Information System (INIS)

    Baker, K.; Olson, J.; Montgomery, J.

    1990-01-01

    The research reported here uses currently available data to begin to document overtime and shift scheduling practices in the nuclear industry and assess their safety consequences. Overtime and the 12-hour shift schedule have been found to affect employee fatigue and human error in other industries but neither of these practices have been systematically researched within the nuclear industry. Overtime has long been a standard practice in the nuclear industry and, recently, several licensees have adopted a 12-hour shift schedule for control room operations crews. Although 12-hour shifts have certain benefits for the employer and employee alike (e.g., can require fewer total employees and provide longer periods of time-off) there is some concern that the 12-hour shift may produce greater employee fatigue. Moreover, the 12-hour shift may exacerbate the negative effect of overtime. The potential effect of human error in the nuclear industry for the health and safety of both nuclear power plant workers and the general public requires that these practices be assessed. Data on overtime practices was obtained from the International Brotherhood of Electrical Workers (IBEW) for plants covered by the bargaining unit - approximately 63% of the total number of operating plants. Information on operator shift schedule was collected from all operating plants in 1987 by the NRC. The research produced fairly strong evidence that greater amounts of overtime worked by operators is associated with a greater number of operational problems

  11. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  12. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors.

    Science.gov (United States)

    Zilanawala, Afshin

    2017-06-01

    Objectives Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9-5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Cohort Study (n = 17,397), to investigate the association between types of maternal nonstandard work (evening, night, away from home overnight, and weekends) and breastfeeding behaviors. Results In unadjusted models, exposure to evening shifts was associated with greater odds of breastfeeding initiation (OR 1.71, CI 1.50-1.94) and greater odds of short (OR 1.55, CI 1.32-1.81), intermediate (OR 2.01, CI 1.64-2.47), prolonged partial duration (OR 2.20, CI 1.78-2.72), and prolonged exclusive duration (OR 1.53, CI 1.29-1.82), compared with mothers who were unemployed and those who work other types of nonstandard shifts. Socioeconomic advantage of mothers working evening schedules largely explained the higher odds of breastfeeding initiation and duration. Conclusions Socioeconomic characteristics explain more breastfeeding behaviors among mothers working evening shifts. Policy interventions to increase breastfeeding initiation and duration should consider the timing of maternal work schedules.

  13. Limited access: gender, occupational composition, and flexible work scheduling.

    Science.gov (United States)

    Glauber, Rebecca

    2011-01-01

    The current study draws on national data to explore differences in access to flexible work scheduling by the gender composition of women's and men's occupations. Results show that those who work in integrated occupations are more likely to have access to flexible scheduling. Women and men do not take jobs with lower pay in return for greater access to flexibility. Instead, jobs with higher pay offer greater flexibility. Integrated occupations tend to offer the greatest access to flexible scheduling because of their structural locations. Part-time work is negatively associated with men's access to flexible scheduling but positively associated with women's access. Women have greater flexibility when they work for large establishments, whereas men have greater flexibility when they work for small establishments.

  14. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  15. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  16. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  17. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  18. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  19. Waste management in Greater Vancouver

    Energy Technology Data Exchange (ETDEWEB)

    Carrusca, K. [Greater Vancouver Regional District, Burnaby, BC (Canada); Richter, R. [Montenay Inc., Vancouver, BC (Canada)]|[Veolia Environmental Services, Vancouver, BC (Canada)

    2006-07-01

    An outline of the Greater Vancouver Regional District (GVRD) waste-to-energy program was presented. The GVRD has an annual budget for solid waste management of $90 million. Energy recovery revenues from solid waste currently exceed $10 million. Over 1,660,00 tonnes of GVRD waste is recycled, and another 280,000 tonnes is converted from waste to energy. The GVRD waste-to-energy facility combines state-of-the-art combustion and air pollution control, and has processed over 5 million tonnes of municipal solid waste since it opened in 1988. Its central location minimizes haul distance, and it was originally sited to utilize steam through sales to a recycle paper mill. The facility has won several awards, including the Solid Waste Association of North America award for best facility in 1990. The facility focuses on continual improvement, and has installed a carbon injection system; an ammonia injection system; a flyash stabilization system; and heat capacity upgrades in addition to conducting continuous waste composition studies. Continuous air emissions monitoring is also conducted at the plant, which produces a very small percentage of the total air emissions in metropolitan Vancouver. The GVRD is now seeking options for the management of a further 500,000 tonnes per year of solid waste, and has received 23 submissions from a range of waste energy technologies which are now being evaluated. It was concluded that waste-to-energy plants can be located in densely populated metropolitan areas and provide a local disposal solution as well as a source of renewable energy. Other GVRD waste reduction policies were also reviewed. refs., tabs., figs.

  20. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  1. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  2. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  3. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  4. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  5. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  6. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  7. Courts, Scheduled Damages, and Medical Malpractice Insurance

    DEFF Research Database (Denmark)

    Bertoli, Paola; Grembi, Veronica

    We assess the impact of the introduction of schedules of non-economic damages (i.e. tiered caps systems) on the behavior of insurers operating in the medical liability market for hospitals while controlling the performance of the judicial system, measured as court backlog. Using a difference......-in-differences strategy on Italian data, we find that the introduction of schedules increases the presence of insurers (i.e. medical liability market attractiveness) only in inefficient judicial districts. In the same way, court inefficiency is attractive to insurers for average values of schedules penetration...... of the market, with an increasing positive impact of inefficiency as the territorial coverage of schedules increases. Finally, no significant impact is registered on paid premiums. Our analysis sheds light on a complex set of elements affecting the decisions of insurers in malpractice markets. The analysis...

  8. Immunogenicity and tolerability of recombinant serogroup B meningococcal vaccine administered with or without routine infant vaccinations according to different immunization schedules: a randomized controlled trial.

    Science.gov (United States)

    Gossger, Nicoletta; Snape, Matthew D; Yu, Ly-Mee; Finn, Adam; Bona, Gianni; Esposito, Susanna; Principi, Nicola; Diez-Domingo, Javier; Sokal, Etienne; Becker, Birgitta; Kieninger, Dorothee; Prymula, Roman; Dull, Peter; Ypma, Ellen; Toneatto, Daniela; Kimura, Alan; Pollard, Andrew J

    2012-02-08

    In the absence of an effective vaccine, serogroup B Neisseria meningitidis (MenB) remains a major cause of invasive disease in early childhood in developed countries. To determine the immunogenicity and reactogenicity of a multicomponent MenB vaccine (4CMenB) and routine infant vaccines when given either concomitantly or separately. Phase 2b, multicenter, open-label, parallel-group, randomized controlled study of 1885 infants enrolled at age 2 months from August 2008 to July 2010 in Europe. Participants were randomized 2:2:1:1 to receive (1) 4CMenB at 2, 4, and 6 months with routine vaccines (7-valent pneumococcal and combined diphtheria, tetanus, acellular pertussis, inactivated polio, hepatitis B, Haemophilus influenzae type b vaccines); (2) 4CMenB at 2, 4, and 6 months and routine vaccines at 3, 5, and 7 months; (3) 4CMenB with routine vaccines at 2, 3, and 4 months; or (4) routine vaccines alone at 2, 3, and 4 months. Percentage of participants with human complement serum bactericidal activity (hSBA) titer of 1:5 or greater against 3 MenB strains specific for vaccine antigens (NZ98/254, 44/76-SL, and 5/99). After three 4CMenB vaccinations, 99% or more of infants developed hSBA titers of 1:5 or greater against strains 44/76-SL and 5/99. For NZ98/254, this proportion was 79% (95% CI, 75.2%-82.4%) for vaccination at 2, 4, and 6 months with routine vaccines, 86.1% (95% CI, 82.9%-89.0%) for vaccination at 2, 4, and 6 months without routine vaccines, and 81.7% (95% CI, 76.6%-86.2%) for vaccination at 2, 3, and 4 months with routine vaccines. Responses to routine vaccines given with 4CMenB were noninferior to routine vaccines alone for all antigens, except for the responses to pertactin and serotype 6B pneumococcal polysaccharide. Fever was seen following 26% (158/602) to 41% (247/607) of 4CMenB doses when administered alone, compared with 23% (69/304) to 36% (109/306) after routine vaccines given alone and 51% (306/605) to 61% (380/624) after 4CMenB and routine

  9. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  10. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  11. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  12. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  13. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  14. Use of a novel docosahexaenoic acid (DHA) formulation versus control in a neonatal porcine model of short bowel syndrome leads to greater intestinal absorption and higher systemic levels of DHA

    Science.gov (United States)

    Martin, Camilia R.; Stoll, Barbara; Cluette-Brown, Joanne; Akinkuotu, Adesola C.; Olutoye, Oluyinka O.; Gura, Kathleen M.; Singh, Pratibha; Zaman, Munir M.; Perillo, Michael C.; Puder, Mark; Freedman, Steven D.; Burrin, Doug

    2017-01-01

    Infants with short bowel syndrome (SBS) are at high risk for malabsorption, malnutrition, and failure to thrive. The objective of this study was to evaluate in a porcine model of SBS, the systemic absorption of a novel enteral Docosahexaenoic acid (DHA) formulation that forms micelles independent of bile salts (DHA-ALT®). We hypothesized that enteral delivery of DHA-ALT® would result in higher blood levels of DHA compared to a control DHA preparation due to improved intestinal absorption. SBS was induced in term piglets through a 75% mid-jejunoileal resection and the piglets randomized to either DHA-ALT® or control DHA formulation (N=5 per group) for 4 postoperative days. The median ± IQR difference in final versus starting weight was 696 ± 425g in the DHA-ALT® group compared to 132 ± 278g in the controls (p=.08). Within 12 hours, median ± IQR DHA and eicosapentaenoic acid plasma levels (mol%) were significantly higher in the DHA-ALT® vs. control group (4.1 ± 0.3 vs 2.5 ± 0.5, p=0.009; 0.7 ± 0.3 vs 0.2 ± 0.005, p=0.009, respectively). There were lower fecal losses of DHA and greater ileal tissue incorporation with DHA-ALT® versus the control. Morphometric analyses demonstrated an increase in proximal jejunum and distal ileum villus height in the DHA-ALT® group compared to controls (p=0.01). In a neonatal porcine model of SBS, enteral administration of a novel DHA preparation that forms micelles independent of bile salts resulted in increased fatty acid absorption, increased ileal tissue incorporation, and increased systemic levels of DHA. PMID:28385289

  15. Use of a novel docosahexaenoic acid formulation vs control in a neonatal porcine model of short bowel syndrome leads to greater intestinal absorption and higher systemic levels of DHA.

    Science.gov (United States)

    Martin, Camilia R; Stoll, Barbara; Cluette-Brown, Joanne; Akinkuotu, Adesola C; Olutoye, Oluyinka O; Gura, Kathleen M; Singh, Pratibha; Zaman, Munir M; Perillo, Michael C; Puder, Mark; Freedman, Steven D; Burrin, Doug

    2017-03-01

    Infants with short bowel syndrome (SBS) are at high risk for malabsorption, malnutrition, and failure to thrive. The objective of this study was to evaluate in a porcine model of SBS, the systemic absorption of a novel enteral Docosahexaenoic acid (DHA) formulation that forms micelles independent of bile salts (DHA-ALT®). We hypothesized that enteral delivery of DHA-ALT® would result in higher blood levels of DHA compared to a control DHA preparation due to improved intestinal absorption. SBS was induced in term piglets through a 75% mid-jejunoileal resection and the piglets randomized to either DHA-ALT® or control DHA formulation (N=5 per group) for 4 postoperative days. The median±IQR difference in final vs starting weight was 696±425 g in the DHA-ALT® group compared to 132±278 g in the controls (P=.08). Within 12 hours, median±IQR DHA and eicosapentaenoic acid plasma levels (mol%) were significantly higher in the DHA-ALT® vs control group (4.1±0.3 vs 2.5±0.5, P=.009; 0.7±0.3 vs 0.2±0.005, P=.009, respectively). There were lower fecal losses of DHA and greater ileal tissue incorporation with DHA-ALT® vs the control. Morphometric analyses demonstrated an increase in proximal jejunum and distal ileum villus height in the DHA-ALT® group compared to controls (P=.01). In a neonatal porcine model of SBS, enteral administration of a novel DHA preparation that forms micelles independent of bile salts resulted in increased fatty acid absorption, increased ileal tissue incorporation, and increased systemic levels of DHA. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. Butterfly valves: greater use in power plants

    International Nuclear Information System (INIS)

    McCoy, M.

    1975-01-01

    Improvements in butterfly valves, particularly in the areas of automatic control and leak tightness are described. The use of butterfly valves in nuclear power plants is discussed. These uses include service in component cooling, containment cooling, and containment isolation. The outlook for further improvements and greater uses is examined. (U.S.)

  17. A Comparison of Escalating versus Fixed Reinforcement Schedules on Undergraduate Quiz Taking

    Science.gov (United States)

    Mahoney, Amanda

    2017-01-01

    Drug abstinence studies indicate that escalating reinforcement schedules maintain abstinence for longer periods than fixed reinforcement schedules. The current study evaluated whether escalating reinforcement schedules would maintain more quiz taking than fixed reinforcement schedules. During baseline and for the control group, bonus points were…

  18. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  19. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  20. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  1. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  2. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  3. Prospective Randomized Controlled Study on the Efficacy of Multimedia Informed Consent for Patients Scheduled to Undergo Green-Light High-Performance System Photoselective Vaporization of the Prostate

    Directory of Open Access Journals (Sweden)

    Dong Yeub Ham

    2016-04-01

    Full Text Available Purpose: The aim of this study was to evaluate the efficacy of a multimedia informed consent (IC presentation on the understanding and satisfaction of patients who were scheduled to receive 120-W green-light high-performance system photoselective vaporization of the prostate (HPS-PVP. Materials and Methods: A multimedia IC (M-IC presentation for HPS-PVP was developed. Forty men with benign prostatic hyperplasia who were scheduled to undergo HPS-PVP were prospectively randomized to a conventional written IC group (W-IC group, n=20 or the M-IC group (n=20. The allocated IC was obtained by one certified urologist, followed by a 15-question test (maximum score, 15 to evaluate objective understanding, and questionnaires on subjective understanding (range, 0∼10 and satisfaction (range, 0∼10 using a visual analogue scale. Results: Demographic characteristics, including age and the highest level of education, did not significantly differ between the two groups. No significant differences were found in scores reflecting the objective understanding of HPS-PVP (9.9±2.3 vs. 10.6±2.8, p=0.332 or in subjective understanding scores (7.5±2.1 vs. 8.6±1.7, p=0.122; however, the M-IC group showed higher satisfaction scores than the W-IC group (7.4±1.7 vs. 8.4±1.5, p=0.033. After adjusting for age and educational level, the M-IC group still had significantly higher satisfaction scores. Conclusions: M-IC did not enhance the objective knowledge of patients regarding this surgical procedure. However, it improved the satisfaction of patients with the IC process itself.

  4. Prospective Randomized Controlled Study on the Efficacy of Multimedia Informed Consent for Patients Scheduled to Undergo Green-Light High-Performance System Photoselective Vaporization of the Prostate

    Science.gov (United States)

    Ham, Dong Yeub; Choi, Woo Suk; Song, Sang Hoon; Ahn, Young-Joon; Park, Hyoung Keun; Kim, Hyeong Gon

    2016-01-01

    Purpose The aim of this study was to evaluate the efficacy of a multimedia informed consent (IC) presentation on the understanding and satisfaction of patients who were scheduled to receive 120-W green-light high-performance system photoselective vaporization of the prostate (HPS-PVP). Materials and Methods A multimedia IC (M-IC) presentation for HPS-PVP was developed. Forty men with benign prostatic hyperplasia who were scheduled to undergo HPS-PVP were prospectively randomized to a conventional written IC group (W-IC group, n=20) or the M-IC group (n=20). The allocated IC was obtained by one certified urologist, followed by a 15-question test (maximum score, 15) to evaluate objective understanding, and questionnaires on subjective understanding (range, 0~10) and satisfaction (range, 0~10) using a visual analogue scale. Results Demographic characteristics, including age and the highest level of education, did not significantly differ between the two groups. No significant differences were found in scores reflecting the objective understanding of HPS-PVP (9.9±2.3 vs. 10.6±2.8, p=0.332) or in subjective understanding scores (7.5±2.1 vs. 8.6±1.7, p=0.122); however, the M-IC group showed higher satisfaction scores than the W-IC group (7.4±1.7 vs. 8.4±1.5, p=0.033). After adjusting for age and educational level, the M-IC group still had significantly higher satisfaction scores. Conclusions M-IC did not enhance the objective knowledge of patients regarding this surgical procedure. However, it improved the satisfaction of patients with the IC process itself. PMID:27169129

  5. ESSOPE: Towards S/C operations with reactive schedule planning

    Science.gov (United States)

    Wheadon, J.

    1993-01-01

    The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.

  6. Step-by-step cyclic processes scheduling

    DEFF Research Database (Denmark)

    Bocewicz, G.; Nielsen, Izabela Ewa; Banaszak, Z.

    2013-01-01

    Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to pro......Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research...... is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS’s material handling and production routes of simultaneously manufactured...... orders, the main objective is to provide the declarative framework aimed at conditions allowing one to calculate the AGVs fleet schedule in online mode. An illustrative example of the relevant algebra-like driven step-by-stem cyclic scheduling is provided....

  7. Scheduled feeding results in adipogenesis and increased acylated ghrelin

    OpenAIRE

    Verbaeys, I.; Tolle, V.; SWENNEN, Quirine; Zizzari, P.; Buyse, J.; Epelbaum, J.; Cokelaere, M.

    2011-01-01

    Ghrelin, known to stimulate adipogenesis, displays an endogenous secretory rhythmicity closely related to meal patterns. Therefore, a chronic imposed feeding schedule might induce modified ghrelin levels and consequently adiposity. Growing Wistar rats were schedule-fed by imposing a particular fixed feeding schedule of 3 meals/day without caloric restriction compared with total daily control intake. After 14 days, their body composition was measured by DEXA and compared with ad libitum-fed co...

  8. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  9. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  10. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  11. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  12. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  13. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  14. Autonomous scheduling technology for Earth orbital missions

    Science.gov (United States)

    Srivastava, S.

    1982-01-01

    The development of a dynamic autonomous system (DYASS) of resources for the mission support of near-Earth NASA spacecraft is discussed and the current NASA space data system is described from a functional perspective. The future (late 80's and early 90's) NASA space data system is discussed. The DYASS concept, the autonomous process control, and the NASA space data system are introduced. Scheduling and related disciplines are surveyed. DYASS as a scheduling problem is also discussed. Artificial intelligence and knowledge representation is considered as well as the NUDGE system and the I-Space system.

  15. Real-time systems scheduling 2 focuses

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc. Scheduling is a central problem for these computing/communication systems since it is responsible for software execution in a timely manner. This book, the second of two volumes on the subject, brings together knowledge on specific topics and discusses the recent advances for some of them.  It addresses foundations as well as the latest advances and findings in real-time scheduling, giving comprehensive references to important papers, but the chapters are short and not overloaded with co

  16. Real-time systems scheduling fundamentals

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc.  Scheduling is a central problem for these computing/communication systems since responsible of software execution in a timely manner. This book provides state of knowledge in this domain with special emphasis on the key results obtained within the last decade. This book addresses foundations as well as the latest advances and findings in Real-Time Scheduling, giving all references to important papers. But nevertheless the chapters will be short and not overloaded with confusing details.

  17. [Autoerotic fatalities in Greater Dusseldorf].

    Science.gov (United States)

    Hartung, Benno; Hellen, Florence; Borchard, Nora; Huckenbeck, Wolfgang

    2011-01-01

    Autoerotic fatalities in the Greater Dusseldorf area correspond to the relevant medicolegal literature. Our results included exclusively young to middle-aged, usually single men who were found dead in their city apartments. Clothing and devices used showed a great variety. Women's or fetish clothing and complex shackling or hanging devices were disproportionately frequent. In most cases, death occurred due to hanging or ligature strangulation. There was no increased incidence of underlying psychiatric disorders. In most of the deceased no or at least no remarkable alcohol intoxication was found. Occasionally, it may be difficult to reliably differentiate autoerotic accidents, accidents occurring in connection with practices of bondage & discipline, dominance & submission (BDSM) from natural death, suicide or homicide.

  18. Planning for greater confinement disposal

    International Nuclear Information System (INIS)

    Gilbert, T.L.; Luner, C.; Meshkov, N.K.; Trevorrow, L.E.; Yu, C.

    1985-01-01

    A report that provides guidance for planning for greater-confinement disposal (GCD) of low-level radioactive waste is being prepared. The report addresses procedures for selecting a GCD technology and provides information for implementing these procedures. The focus is on GCD; planning aspects common to GCD and shallow-land burial are covered by reference. Planning procedure topics covered include regulatory requirements, waste characterization, benefit-cost-risk assessment and pathway analysis methodologies, determination of need, waste-acceptance criteria, performance objectives, and comparative assessment of attributes that support these objectives. The major technologies covered include augered shafts, deep trenches, engineered structures, hydrofracture, improved waste forms, and high-integrity containers. Descriptive information is provided, and attributes that are relevant for risk assessment and operational requirements are given. 10 refs., 3 figs., 2 tabs

  19. Antimeasles antibodies in children submitted to different vaccination schedules

    Directory of Open Access Journals (Sweden)

    Solange Artimos de Oliveira

    1993-06-01

    Full Text Available ln order to study the measles antibody behavior of three vaccination schedules, 684 children were divided into 4 Groups: Group A (341 vaccinated children under the age of one; Group B (101 children at the age of one; Group C (74 children under the age of one and one at the age of one; Group D (163 unvaccinated children with a history of measles in the past - Group control. Children of Group A presented lower rates and 25.9% of the age group under two did not show any measles antibodies. In Group B, all the children presented antibodies. In Group C onby 4.0% did not. In all age groups, the geometric mean HI antibody titers of Group A were lower than the valuesfound in the other groups. The age at vaccination was the factor of greater influence on the results of this study.

  20. Optimal Scheduling of Domestic Appliances via MILP

    Directory of Open Access Journals (Sweden)

    Zdenek Bradac

    2014-12-01

    Full Text Available This paper analyzes a consumption scheduling mechanism for domestic appliances within a home area network. The aim of the proposed scheduling is to minimize the total energy price paid by the consumer and to reduce power peaks in order to achieve a balanced daily load schedule. An exact and computationally efficient mixed-integer linear programming (MILP formulation of the problem is presented. This model is verified by several problem instances. Realistic scenarios based on the real price tariffs commercially available in the Czech Republic are calculated. The results obtained by solving the optimization problem are compared with a simulation of the ripple control service currently used by many domestic consumers in the Czech Republic.

  1. Immunogenicity and safety evaluation of bivalent types 1 and 3 oral poliovirus vaccine by comparing different poliomyelitis vaccination schedules in China: A randomized controlled non-inferiority clinical trial.

    Science.gov (United States)

    Qiu, Jingjun; Yang, Yunkai; Huang, Lirong; Wang, Ling; Jiang, Zhiwei; Gong, Jian; Wang, Wei; Wang, Hongyan; Guo, Shaohong; Li, Chanjuan; Wei, Shuyuan; Mo, Zhaojun; Xia, Jielai

    2017-06-03

    The type 2 component of the oral poliovirus vaccine is targeted for global withdrawal through a switch from the trivalent oral poliovirus vaccine (tOPV) to a bivalent oral poliovirus vaccine (bOPV). The switch is intended to prevent paralytic polio caused by circulating vaccine-derived poliovirus type 2. We aimed to assess the immunogenicity and safety profile of 6 vaccination schedules with different sequential doses of inactivated poliovirus vaccine (IPV), tOPV, or bOPV. A randomized controlled trial was conducted in China in 2015. Healthy newborn babies randomly received one of the following 6 vaccination schedules: cIPV-bOPV-bOPV(I-B-B), cIPV-tOPV-tOPV(I-T-T), cIPV-cIPV-bOPV(I-I-B), cIPV-cIPV-tOPV(I-I-T), cIPV-cIPV-cIPV(I-I-I), or tOPV-tOPV-tOPV(T-T-T). Doses were administered sequentially at 4-6 week intervals after collecting baseline blood samples. Patients were proactively followed up for observation of adverse events after the first dose and 30 days after all doses. The primary study objective was to investigate the immunogenicity and safety profile of different vaccine schedules, evaluated by seroconversion, seroprotection and antibody titer against poliovirus types 1, 2, and 3 in the per-protocol population. Of 600 newborn babies enrolled, 504 (84.0%) were included in the per-protocol population. For type 1 poliovirus, the differences in the seroconversion were 1.17% (95% CI = -2.74%, 5.08%) between I-B-B and I-T-T and 0.00% (95% CI: -6.99%, 6.99%) between I-I-B and I-I-T; for type 3 poliovirus, differences in the seroconversion were 3.49% (95% CI: -1.50%, 8.48%) between I-B-B and I-T-T and -2.32% (95% CI: -5.51%, 0.86%) between I-I-B and I-I-T. The non-inferiority conclusion was achieved in both poliovirus type 1 and 3 with the margin of -10%. Of 24 serious adverse events reported, no one was vaccine-related. The vaccination schedules with bOPV followed by one or 2 doses of IPV were recommended to substitute for vaccinations involving tOPV without

  2. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  3. A theory of behaviour on progressive ratio schedules, with applications in behavioural pharmacology.

    Science.gov (United States)

    Bradshaw, C M; Killeen, P R

    2012-08-01

    Mathematical principles of reinforcement (MPR) provide the theoretical basis for a family of models of schedule-controlled behaviour. A model of fixed-ratio schedule performance that was applied to behaviour on progressive ratio (PR) schedules showed systematic departures from the data. This study aims to derive a new model from MPR that will account for overall and running response rates in the component ratios of PR schedules, and their decline toward 0, the breakpoint. The role of pausing is represented in a real-time model containing four parameters: T (0) and k are the intercept and slope of the linear relation between post-reinforcement pause duration and the prior inter-reinforcer interval; a (specific activation) measures the incentive value of the reinforcer; δ (response time) sets biomechanical limits on response rate. Running rate is predicted to decrease with negative acceleration as ratio size increments, overall rate to increase and then decrease. Differences due to type of progression are explained as hysteresis in the control by reinforcement rates. Re-analysis of extant data focuses on the effects of acute treatment with antipsychotic drugs, lesions of the nucleus accumbens core, and destruction of orexinergic neurones of the lateral hypothalamus. The new model resolves some anomalies evident in earlier analyses, and provides new insights to the results of these interventions. Because they can render biologically relevant parameters, mathematical models can provide greater power in interpreting the effects of interventions on the processes underlying schedule-controlled behaviour than is possible for first-order data such as the breakpoint.

  4. Scheduling and Topology Design in Networks with Directional Antennas

    Science.gov (United States)

    2017-05-19

    Scheduling and Topology Design in Networks with Directional Antennas Thomas Stahlbuhk, Nathaniel M. Jones, Brooke Shrader Lincoln Laboratory...controllers must choose which pairs of nodes should communicate in order to establish a topology over which traffic can be sent. Additionally...interacting effects of topology design and transmission scheduling in wireless networks, in particular focusing on networks where nodes are divided into

  5. Changed nursing scheduling for improved safety culture and working conditions - patients' and nurses' perspectives.

    Science.gov (United States)

    Kullberg, Anna; Bergenmar, Mia; Sharp, Lena

    2016-05-01

    To evaluate fixed scheduling compared with self-scheduling for nursing staff in oncological inpatient care with regard to patient and staff outcomes. Various scheduling models have been tested to attract and retain nursing staff. Little is known about how these schedules affect staff and patients. Fixed scheduling and self-scheduling have been studied to a small extent, solely from a staff perspective. We implemented fixed scheduling on two of four oncological inpatient wards. Two wards kept self-scheduling. Through a quasi-experimental design, baseline and follow-up measurements were collected among staff and patients. The Safety Attitudes Questionnaire was used among staff, as well as study-specific questions for patients and staff. Fixed scheduling was associated with less overtime and fewer possibilities to change shifts. Self-scheduling was associated with more requests from management for short notice shift changes. The type of scheduling did not affect patient-reported outcomes. Fixed scheduling should be considered in order to lower overtime. Further research is necessary and should explore patient outcomes to a greater extent. Scheduling is a core task for nurse managers. Our study suggests fixed scheduling as a strategy for managers to improve the effective use of resources and safety. © 2016 John Wiley & Sons Ltd.

  6. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  7. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    . The rostering process is non-trivial and especially when service is required around the clock, rostering may involve considerable effort from a designated planner. Therefore, in order to minimize costs and overstaffing, to maximize the utilization of available staff, and to ensure a high level of satisfaction...... as possible to the available staff, while respecting various requirements and rules and while including possible transportation time between tasks. This thesis presents a number of industrial applications in rostering and task scheduling. The applications exist within various contexts in health care....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied...

  8. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  9. Does physiotherapy based on the Bobath concept, in conjunction with a task practice, achieve greater improvement in walking ability in people with stroke compared to physiotherapy focused on structured task practice alone?: a pilot randomized controlled trial.

    Science.gov (United States)

    Brock, Kim; Haase, Gerlinde; Rothacher, Gerhard; Cotton, Susan

    2011-10-01

    To compare the short-term effects of two physiotherapy approaches for improving ability to walk in different environments following stroke: (i) interventions based on the Bobath concept, in conjunction with task practice, compared to (ii) structured task practice alone. Randomized controlled trial. Two rehabilitation centres Participants: Twenty-six participants between four and 20 weeks post-stroke, able to walk with supervision indoors. Both groups received six one-hour physiotherapy sessions over a two-week period. One group received physiotherapy based on the Bobath concept, including one hour of structured task practice. The other group received six hours of structured task practice. The primary outcome was an adapted six-minute walk test, incorporating a step, ramp and uneven surface. Secondary measures were gait velocity and the Berg Balance Scale. Measures were assessed before and after the intervention period. Following the intervention, there was no significant difference in improvement between the two groups for the adapted six-minute walk test (89.9 (standard deviation (SD) 73.1) m Bobath versus 41 (40.7) m task practice, P = 0.07). However, walking velocity showed significantly greater increases in the Bobath group (26.2 (SD 17.2) m/min versus 9.9 (SD = 12.9) m/min, P = 0.01). No significant differences between groups were recorded for the Berg Balance Scale (P = 0.2). This pilot study indicates short-term benefit for using interventions based on the Bobath concept for improving walking velocity in people with stroke. A sample size of 32 participants per group is required for a definitive study.

  10. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  11. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  12. Optimal Load-Tracking Operation of Grid-Connected Solid Oxide Fuel Cells through Set Point Scheduling and Combined L1-MPC Control

    Directory of Open Access Journals (Sweden)

    Siwei Han

    2018-03-01

    Full Text Available An optimal load-tracking operation strategy for a grid-connected tubular solid oxide fuel cell (SOFC is studied based on the steady-state analysis of the system thermodynamics and electrochemistry. Control of the SOFC is achieved by a two-level hierarchical control system. In the upper level, optimal setpoints of output voltage and the current corresponding to unit load demand is obtained through a nonlinear optimization by minimizing the SOFC’s internal power waste. In the lower level, a combined L1-MPC control strategy is designed to achieve fast set point tracking under system nonlinearities, while maintaining a constant fuel utilization factor. To prevent fuel starvation during the transient state resulting from the output power surging, a fuel flow constraint is imposed on the MPC with direct electron balance calculation. The proposed control schemes are testified on the grid-connected SOFC model.

  13. Toward an Autonomous Telescope Network: the TBT Scheduler

    Science.gov (United States)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  14. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  15. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  16. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  17. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  18. A Two-Level Optimal Scheduling Strategy for Central Air-Conditioners Based on Metal Model with Comprehensive State-Queueing Control Models

    Directory of Open Access Journals (Sweden)

    Yebai Qi

    2017-12-01

    Full Text Available Unlike some thermostatically controlled appliances (TCAs with small capacities, Central Air-conditioner (CAC has huge potential for demand response because of its large capacity. This paper presents a new CAC control strategy under multiple constraints. The CAC is modeled by three main modules: CAC central unit, water pumps, and temperature simulation of terminal users. The CAC’s power consumption is mainly determined by users’ load ratio. As the information and communication system have become the central nervous system of the smart grid, big data analysis is of great significance. Assuming that reliable two-way communication systems are preset, an integrated parameter priority list (IPPL control strategy is used to control and monitor CAC. A new intelligent algorithm, Space Exploration and Unimodal Region Elimination (SEUMRE algorithm, is introduced for solving the optimization problem of demand response targets generation under multiple constraints with the help of big data analysis. In this paper, influences and constrain factors, such as price and users’ comfortable levels are taken into account to satisfy the need of actual situation. Simulation results show that the proposed approach, when comparing with other typical optimization algorithms, yields better performances and efficiency.

  19. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  20. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  1. Refrigerator Optimal Scheduling to Minimise the Cost of Operation

    Directory of Open Access Journals (Sweden)

    Bálint Roland

    2016-12-01

    Full Text Available The cost optimal scheduling of a household refrigerator is presented in this work. The fundamental approach is the model predictive control methodology applied to the piecewise affine model of the refrigerator.

  2. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  3. Improved human performance through appropriate work scheduling

    International Nuclear Information System (INIS)

    Morisseau, D.S.; Lewis, P.M.; Persensky, J.J.

    1987-01-01

    The Nuclear Regulatory Commission (NRC) has had a policy, Generic Letter 82-12, on hours of work since 1982. The policy states that licensees should establish controls to prevent situations where fatigue could reduce the ability of operating personnel to perform their duties safely (USNRC 1982). While that policy does give guidance on hours of work and overtime, it does not address periods of longer than 7 days or work schedules other than the routine 8-hour day, 40-hour week. Recognizing that NRC policy could provide broader guidance for shift schedules and hours of overtime work, the Division of Human Factors Safety conducted a project with Pacific Northwest Laboratories (PNL) to help the NRC better understand the human factors principles and issues concerning hours of work so that the NRC could consider updating their policy as necessary. The results of this project are recommendations for guidelines and limits for periods of 14 days, 28 days, and 1 year to take into account the cumulative effects of fatigue. In addition, routine 12-hour shifts are addressed. This latter type of shift schedule has been widely adopted in the petroleum and chemical industries and several utilities operating nuclear power plants have adopted it as well. Since this is the case, it is important to consider including guidelines for implementing this type of schedule. This paper discusses the bases for the PNL recommendations which are currently being studied by the NRC

  4. Compromised local control due to treatment interruptions and late treatment breaks in early glottic cancer: Population-based outcomes study supporting need for intensified treatment schedules

    International Nuclear Information System (INIS)

    Groome, Patti A.; O'Sullivan, Brian; Mackillop, William J.; Jackson, Lynda D.; Schulze, Karleen M.Math.; Irish, Jonathan C.; Warde, Padraig R.; Schneider, Ken M.; Mackenzie, Robert G.; Hodson, D. Ian; Hammond, J. Alex; Gulavita, Sunil P.P.; Eapen, Libni J.; Dixon, Peter F. M.B.; Bissett, Randy J.

    2006-01-01

    Purpose: This population-based study describes the treatment of early glottic cancer in Ontario, Canada and assesses whether treatment variations were associated with treatment effectiveness. Methods and Materials: We studied 491 T1N0 and 213 T2N0 patients. Data abstracted from charts included age, sex, stage, treatment details, disease control, and survival. Results: The total dose ranged from 50 to 70 Gy, and the daily dose ranged from 1.9 to 2.8 Gy. In 90%, treatment duration was between 25 and 50 days. Field sizes, field reductions, beam arrangement, and beam energy varied. Late treatment breaks occurred in 13.6% of T1N0 and 27.1% of T2N0 cases. Local control was comparable to other reports for T1N0 (82% at 5 years), but was only 63.2% in T2N0. Variables associated with local failure in T1N0 were age less than 49 years (relative risk [RR], 3.21; 95% confidence interval [CI], 1.49-6.90) and >3 treatment interruption days (RR, 2.43; 95% CI, 1.00-5.91). In T2N0, these were field reduction (RR, 2.33; 95% CI, 1.23-4.42) and late treatment breaks (RR, 2.19; 95% CI, 1.09-4.41). Conclusion: Some aspects of treatment for early glottic cancer were associated with worse local control. Problems with protracted treatment are of particular concern, underscoring the need for randomized studies to intensify radiotherapy

  5. Streaming system scheduling for Xeon Phi

    OpenAIRE

    Faltín, Tomáš

    2017-01-01

    Task scheduling in operating system area is a well-known problem on traditional system architectures (NUMA, SMP). Unfortunately, it does not perform well on emerging many-core architectures, especially on Intel Xeon Phi. We collected all publicly available information about the architecture of Xeon Phi. After that, we benchmarked the Xeon Phi in order to find the missing information about its architecture. We focused especially on the information about cores and memory controllers. These are ...

  6. New MA 23 master-slave manipulators with servo control and force feedback. Their application in routine work and in scheduled and exceptional operations

    International Nuclear Information System (INIS)

    Vertut, J.; Marchal, P.; Debrie, G.; Kissel, Ph.

    1976-01-01

    Manipulators of this type manufactured 10-15 years ago were not a success, their widespread introduction having been prevented by their excessive weight, too low capacity, too extensive electronics and high price. The MA 22 system, based on the Virgule device, led to the development of a new technology which combines high reliability with excellent performance, very small electronics and high-torque d.c. motors. The second generation, MA 23, is characterized by a substantially improved mechanism, enabling maximum advantage to be derived from the servo control and making it possible to reproduce, at unlimited distance and with very high slave strength, the dexterity displaced by light master-slave manipulators on the operator side. The authors describe the equipment and indicate the various possibilites for its use in facilities. Long-term development and testing is also being directed towards under-water operation and industrial automatic manipulation. The equipment described opens up a totally new potential for the development of remote-controlled intervention devices, and the authors refer to work on these lines in the Federal Republic of Germany and in France. The research and development effort will also be concerned with penetration into inaccessible parts of facilities. (author)

  7. Request-Driven Schedule Automation for the Deep Space Network

    Science.gov (United States)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol

    2010-01-01

    The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

  8. Manufacturing Scheduling Using Colored Petri Nets and Reinforcement Learning

    Directory of Open Access Journals (Sweden)

    Maria Drakaki

    2017-02-01

    Full Text Available Agent-based intelligent manufacturing control systems are capable to efficiently respond and adapt to environmental changes. Manufacturing system adaptation and evolution can be addressed with learning mechanisms that increase the intelligence of agents. In this paper a manufacturing scheduling method is presented based on Timed Colored Petri Nets (CTPNs and reinforcement learning (RL. CTPNs model the manufacturing system and implement the scheduling. In the search for an optimal solution a scheduling agent uses RL and in particular the Q-learning algorithm. A warehouse order-picking scheduling is presented as a case study to illustrate the method. The proposed scheduling method is compared to existing methods. Simulation and state space results are used to evaluate performance and identify system properties.

  9. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  10. A microeconomic scheduler for parallel computers

    Science.gov (United States)

    Stoica, Ion; Abdel-Wahab, Hussein; Pothen, Alex

    1995-01-01

    We describe a scheduler based on the microeconomic paradigm for scheduling on-line a set of parallel jobs in a multiprocessor system. In addition to the classical objectives of increasing the system throughput and reducing the response time, we consider fairness in allocating system resources among the users, and providing the user with control over the relative performances of his jobs. We associate with every user a savings account in which he receives money at a constant rate. When a user wants to run a job, he creates an expense account for that job to which he transfers money from his savings account. The job uses the funds in its expense account to obtain the system resources it needs for execution. The share of the system resources allocated to the user is directly related to the rate at which the user receives money; the rate at which the user transfers money into a job expense account controls the job's performance. We prove that starvation is not possible in our model. Simulation results show that our scheduler improves both system and user performances in comparison with two different variable partitioning policies. It is also shown to be effective in guaranteeing fairness and providing control over the performance of jobs.

  11. Contribution of Schedule Delays to Cost Growth: How to Make Peace with a Marching Army

    Science.gov (United States)

    Majerowicz, Walt; Bitten, Robert; Emmons, Debra; Shinn, Stephen A.

    2016-01-01

    Numerous research papers have shown that cost and schedule growth are interrelated for NASA space science missions. Although there has shown to be a strong correlation of cost growth with schedule growth, it is unclear what percentage of cost growth is caused by schedule growth and how schedule growth can be controlled. This paper attempts to quantify this percentage by looking at historical data and show detailed examples of how schedule growth influences cost growth. The paper also addresses a methodology to show an alternate approach for assessing and setting a robust baseline schedule and use schedule performance metrics to help assess if the project is performing to plan. Finally, recommendations are presented to help control schedule growth in order to minimize cost growth for NASA space science missions.

  12. Impact of the Hydrocodone Schedule Change on Opioid Prescription Patterns in South Dakota.

    Science.gov (United States)

    Kuschel, Lauren M; Mort, Jane M

    2017-10-01

    Prescription opioid use is becoming increasingly common; consequently, opioid overdose deaths are increasing at an alarming rate. Hydrocodone, one of the most commonly abused opioids, was changed from a schedule III controlled substance to the more stringent schedule II to decrease abuse and diversion, effective Oct. 6, 2014. The objective of this study was to examine the impact of the hydrocodone schedule change on opioid prescribing in South Dakota. Opioid prescription patterns were examined in the following six-month phases: the baseline phase before the change, the transition phase when existing hydrocodone prescriptions could still be refilled, and the final phase. The South Dakota Board of Pharmacy Prescription Drug Monitoring Program provided aggregate monthly data for South Dakota opioid prescriptions (i.e., total number of prescriptions and days supplied), including urban and rural stratification. T-tests were performed on the monthly values for each phase to determine the significance of differences in prescription features between phases. The number of hydrocodone prescriptions significantly decreased 14 percent from baseline to final phase, while the days supplied per prescription significantly increased 7.4 percent. These changes were greater in rural areas than in urban areas. Conversely, the number of other opioid prescriptions significantly increased by 6.5 percent over this timeframe. The number of hydrocodone prescriptions decreased, while the days supplied per prescription increased. These changes were greater in rural areas than in urban areas. In addition, the number of other opioid prescriptions increased. These trends may reflect some unintended effects of the schedule change.

  13. Extending RTA/Linux with fixed-priority scheduling with deferred preemption

    NARCIS (Netherlands)

    Bergsma, M.; Holenderski, M.J.; Bril, R.J.; Lukkien, J.J.; Petters, S.M.; Zijlstra, P.

    2009-01-01

    Fixed-Priority Scheduling with Deferred Preemption (FPDS) is a middle ground between Fixed-Priority Pre-emptive Scheduling and Fixed-Priority Non-preemptive Scheduling, and offers advantages with respect to context switch overhead and resource access control. In this paper we present our work on

  14. A decentralized scheduling algorithm for time synchronized channel hopping

    Directory of Open Access Journals (Sweden)

    Andrew Tinka

    2011-09-01

    Full Text Available Time Synchronized Channel Hopping (TSCH is an existing Medium Access Control scheme which enables robust communication through channel hopping and high data rates through synchronization. It is based on a time-slotted architecture, and its correct functioning depends on a schedule which is typically computed by a central node. This paper presents, to our knowledge, the first scheduling algorithm for TSCH networks which both is distributed and which copes with mobile nodes. Two variations on scheduling algorithms are presented. Aloha-based scheduling allocates one channel for broadcasting advertisements for new neighbors. Reservation- based scheduling augments Aloha-based scheduling with a dedicated timeslot for targeted advertisements based on gossip information. A mobile ad hoc motorized sensor network with frequent connectivity changes is studied, and the performance of the two proposed algorithms is assessed. This performance analysis uses both simulation results and the results of a field deployment of floating wireless sensors in an estuarial canal environment. Reservation-based scheduling performs significantly better than Aloha-based scheduling, suggesting that the improved network reactivity is worth the increased algorithmic complexity and resource consumption.

  15. Control of microstructure in brazed zone of Zircaloy-4 nuclear fuel sheathing by optimization of Σ(C+P+Si) contents and cooling schedules

    International Nuclear Information System (INIS)

    Quach, V.; Northwood, D.O.

    1985-01-01

    In the production of fuel elements for the CANDU-PHW reactor, induction brazing is used to attach appendages (bearing and split spacer pads) onto the outside wall of the Zircaloy-4 sheathing. The brazing process, 40 to 60 seconds at temperature in excess of 1000 0 C, produces 3 heat-affected zones amounting to about 30% of the thickness. These heat affected zones quite often contain large grains and either a basketweave or a parallel plate type of Widmanstatten structure. Small grains and a basketweave structure are preferred. Using simulated brazing treatments, it is demonstrated that by control of the impurity content, Σ(C+P+Si), and cooling rate from the brazing temperature, the desired microstructure can be obtained in the braze heat-affected zone. The formation of the basketweave structure is promoted by higher impurity contents, with the second phase impurity particles acting as nuclei for the basketweave structure in preference to the β-grain boundaries where the parallel plate structure is nucleated

  16. Greater Sudbury fuel efficient driving handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-12-15

    Reducing the amount of fuel that people use for personal driving saves money, improves local air quality, and reduces personal contributions to climate change. This handbook was developed to be used as a tool for a fuel efficient driving pilot program in Greater Sudbury in 2009-2010. Specifically, the purpose of the handbook was to provide greater Sudbury drivers with information on how to drive and maintain their personal vehicles in order to maximize fuel efficiency. The handbook also provides tips for purchasing fuel efficient vehicles. It outlines the benefits of fuel maximization, with particular reference to reducing contributions to climate change; reducing emissions of air pollutants; safe driving; and money savings. Some tips for efficient driving are to avoid aggressive driving; use cruise control; plan trips; and remove excess weight. Tips for efficient winter driving are to avoid idling to warm up the engine; use a block heater; remove snow and ice; use snow tires; and check tire pressure. The importance of car maintenance and tire pressure was emphasized. The handbook also explains how fuel consumption ratings are developed by vehicle manufacturers. refs., figs.

  17. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  18. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  19. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  20. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  1. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  2. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  3. Comparison of two-dose priming plus 9-month booster with a standard three-dose priming schedule for a ten-valent pneumococcal conjugate vaccine in Nepalese infants: a randomised, controlled, open-label, non-inferiority trial.

    Science.gov (United States)

    Hamaluba, Mainga; Kandasamy, Rama; Upreti, Shyam R; Subedi, Giri R; Shrestha, Shrijana; Bhattarai, Shiva; Gurung, Meeru; Pradhan, Rahul; Voysey, Merryn; Gurung, Santosh; Pradhan, Shachi; Thapa, Anushil K; Maharjan, Rakesh; Kiran, Usha; Kerridge, Simon A; Hinds, Jason; van der Klis, Fiona; Snape, Matthew D; Murdoch, David R; Kelly, Sarah; Kelly, Dominic F; Adhikari, Neelam; Thorson, Stephen; Pollard, Andrew J

    2015-04-01

    Use of pneumococcal conjugate vaccines (PCVs) in resource-poor countries has focused on early infant immunisation with little emphasis on protection in late infancy and beyond. Boosting of the immune response later in infancy might provide improved persistence of immunogenicity into early childhood, however data are scarce. The aim of this study was to investigate if a two-dose prime with booster at age 9 months compared with a three-dose prime-only PCV schedule provided non-inferior immunogenicity in early infancy and superior persistence of antibody responses in early childhood. We did an open-label, randomised, parallel group, controlled trial in healthy infants aged 40-60 days from Kathmandu, Nepal. Participants were randomly allocated (4:4:5 ratio) to receive PCV10 in addition to routine immunisations either as a two-dose prime and boost (2+1), three-dose prime (3+0), or two doses after completion of the initial study phase (0+2). We used a computer generated randomisation list with randomly varying block sizes. We followed up participants at age 2-4 years together with a group of unvaccinated controls. Sera were analysed for opsonophagocytic activity, protein D, and PCV10 serotype-specific IgG. Laboratory staff was masked to intervention group assignment. The primary outcome measure was to determine the proportion of participants in the 2+1 group at age 10 months with specific IgG for serotypes 1, 5, and 14 of at least 0·2 μg/mL in the per-protocol population. The secondary outcomes were non-inferiority (within 10% levels) at age 18 weeks for the proportion of participants in the 2+1 group compared with the 3+0 group with serotypes 1, 5, and 14 specific IgG of at least 0·2 μg/mL; the proportion of participants with PCV10 serotype-specific IgG of at least 0·2 μg/mL and opsonophagocytic activity reciprocal titre of at least 8 at ages 18 weeks and 10 months; and nasopharyngeal pneumococcal serotype-specific carriage rates at age 9 months in each study

  4. A retrospective review of pain control by a two-step irradiance schedule during topical ALA-photodynamic therapy of non-melanoma skin cancer.

    Science.gov (United States)

    Zeitouni, Nathalie C; Paquette, Anne D; Housel, Joseph P; Shi, Yi; Wilding, Gregory E; Foster, Thomas H; Henderson, Barbara W

    2013-02-01

    Photodynamic therapy (PDT) with topical δ-aminolevulinic acid (ALA) of non-melanoma skin cancers is often associated with treatment-limiting pain. A previous study on basal cell carcinomas (BCCs) at Roswell Park Cancer Institute evaluated a two-step irradiance scheme as a means of minimizing pain, preserving outcomes, and limiting treatment time. We used an initial low irradiance until 90% of the protoporphyrin IX was photobleached, followed by a high irradiance interval until the prescribed fluence was delivered. Success of this pilot investigation motivated integration of the protocol into routine practice. Here, we present a retrospective review of recent clinical experience in a broad patient population. This was a retrospective review of an existing dermatology database. Fourteen caucasion patients-nine men and five women, ages 18-80, with a total of 51 superficial and 73 nodular BCCs, and three Bowen's disease lesions-were included. ALA was applied to each lesion for approximately 4 hours. Lesions received an initial irradiance of 30-50 mW/cm(2) for 20 J/cm(2) , followed by 150 mW/cm(2) for a total fluence of 200-300 J/cm(2) . Pain was assessed using a visual analog scale (VAS). Clinical outcome was determined at 6-12 months. Median VAS scores were 1.0 for both irradiances. Five of 127 lesions required pain control with 1% xylocaine. Pain was strongly influenced by lesion location but not by lesion type, number, or size. Complete responses were achieved in 84.1% of BCCs, which compares favorably with reported results for single ALA-PDT treatments. Two of three Bowen's disease lesions showed a complete response. Complete responses for nodular BCCs were 37%, which are also within the range of reported outcomes. A two-step irradiance protocol in ALA-PDT effectively minimizes pain, maintains excellent clinical outcomes in superficial lesions, and adds minimal treatment time. Copyright © 2013 Wiley Periodicals, Inc.

  5. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  6. Scheduling Aircraft Landings under Constrained Position Shifting

    Science.gov (United States)

    Balakrishnan, Hamsa; Chandran, Bala

    2006-01-01

    Optimal scheduling of airport runway operations can play an important role in improving the safety and efficiency of the National Airspace System (NAS). Methods that compute the optimal landing sequence and landing times of aircraft must accommodate practical issues that affect the implementation of the schedule. One such practical consideration, known as Constrained Position Shifting (CPS), is the restriction that each aircraft must land within a pre-specified number of positions of its place in the First-Come-First-Served (FCFS) sequence. We consider the problem of scheduling landings of aircraft in a CPS environment in order to maximize runway throughput (minimize the completion time of the landing sequence), subject to operational constraints such as FAA-specified minimum inter-arrival spacing restrictions, precedence relationships among aircraft that arise either from airline preferences or air traffic control procedures that prevent overtaking, and time windows (representing possible control actions) during which each aircraft landing can occur. We present a Dynamic Programming-based approach that scales linearly in the number of aircraft, and describe our computational experience with a prototype implementation on realistic data for Denver International Airport.

  7. Scheduling of resource-constrained projects

    CERN Document Server

    Klein, Robert

    2000-01-01

    Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practiti...

  8. A Mechanized Decision Support System for Academic Scheduling.

    Science.gov (United States)

    1986-03-01

    an operational system called software. The first step in the development phase is Design . Designers destribute software control by factoring the Data...SUBJECT TERMS (Continue on reverse if necessary and identify by block number) ELD GROUP SUB-GROUP Scheduling, Decision Support System , Software Design ...scheduling system . It will also examine software - design techniques to identify the most appropriate method- ology for this problem. " - Chapter 3 will

  9. Traffic Scheduling in WDM Passive Optical Network with Delay Guarantee

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    WDM passive optical network becomes more favorable as the required bandwidth increases, but currently few media access control algorithms adapted to WDM access network. This paper presented a new scheduling algorithm for bandwidth sharing in WDM passive optical networks, which provides per-flow delay guarantee and supports variable-length packets scheduling. Through theoretical analysis and simulation, the end-to-end delay bound and throughput fairness of the algorithm was demonstrated.

  10. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  11. Resource Efficient Scheduling, Optimization and Control.

    NARCIS (Netherlands)

    van den Akker, Marjan; Derksen, Christian; Kowalczyk, Ryszard; Mönch, Lars; Valogianni, Konstantina; van Heck, Erik; Zhang, Minjie

    2014-01-01

    This report documents the program and the outcomes of Dagstuhl Seminar 14181 "Multi-agent systems and their role in future energy grids". A number of recent events (e.g. Fukushima, Japan, and the largest blackout in history, India) have once again increased global attention on climate change and

  12. Scheduling of radio-controlled heating load

    International Nuclear Information System (INIS)

    Fox, B.; McCartney, A.I.; McCann, B.M.

    1998-01-01

    An economic loading program has been adapted to enable it to obtain an optimum heat-load profile to meet the forecast heat requirement. The heat load is represented by a 'generator' whose load is constrained to be negative. The incremental cost of this unit is a heat energy price. This is adjusted to obtain a heat profile containing the requisite energy. The profile is then used by a dynamic programming algorithm to derive a commitment pattern for each block. A case study is presented which shows that the procedure can minimise heat energy cost. It is also shown that use of the proposed method results in less generator load cycling. This reduced regulation duty should improve reliability. (author)

  13. Power Saving Scheduling Scheme for Internet of Things over LTE/LTE-Advanced Networks

    Directory of Open Access Journals (Sweden)

    Yen-Wei Kuo

    2015-01-01

    Full Text Available The devices of Internet of Things (IoT will grow rapidly in the near future, and the power consumption and radio spectrum management will become the most critical issues in the IoT networks. Long Term Evolution (LTE technology will become a promising technology used in IoT networks due to its flat architecture, all-IP network, and greater spectrum efficiency. The 3rd Generation Partnership Project (3GPP specified the Discontinuous Reception (DRX to reduce device’s power consumption. However, the DRX may pose unexpected communication delay due to missing Physical Downlink Control Channel (PDCCH information in sleep mode. Recent studies mainly focus on optimizing DRX parameters to manage the tradeoff between the energy consumption and communication latency. In this paper, we proposed a fuzzy-based power saving scheduling scheme for IoT over the LTE/LTE-Advanced networks to deal with the issues of the radio resource management and power consumption from the scheduling and resource allocation perspective. The proposed scheme considers not only individual IoT device’s real-time requirement but also the overall network performance. The simulation results show that our proposed scheme can meet the requirements of the DRX cycle and scheduling latency and can save about half of energy consumption for IoT devices compared to conventional approaches.

  14. GPScheDVS: A New Paradigm of the Autonomous CPU Speed Control for Commodity-OS-based General-Purpose Mobile Computers with a DVS-friendly Task Scheduling

    OpenAIRE

    Kim, Sookyoung

    2008-01-01

    This dissertation studies the problem of increasing battery life-time and reducing CPU heat dissipation without degrading system performance in commodity-OS-based general-purpose (GP) mobile computers using the dynamic voltage scaling (DVS) function of modern CPUs. The dissertation especially focuses on the impact of task scheduling on the effectiveness of DVS in achieving this goal. The task scheduling mechanism used in most contemporary general-purpose operating systems (GPOS) prioritizes t...

  15. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  16. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  17. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  18. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  19. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  20. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  1. Scheduling reinforcement about once a day.

    Science.gov (United States)

    Eckerman, D A

    1999-04-01

    A pigeon earned its daily food by pecking a key according to reinforcement schedules that produced food about once per day. Fixed-interval (FI), Fixed-time (FT), and various complex schedules were arranged to demonstrate the degree to which a scalloped pattern of responding remained. Pausing continued until about an hour before the reinforcer could be earned for FIs of 12, 24, and 48 h. Pausing was not as long for FIs of 18, 19, and 23 h. Pausing of about 24 h was seen for FI 36 h. FT 24 h produced continued responding but at a diminished frequency. The pattern of responding was strongly controlled by the schedule of reinforcement and seemed relatively independent of the cycle of human activity in the surrounding laboratory. Effects of added ratio contingencies and of signaling the availability of reinforcement in FT were also examined. Signaled FTs of 5 min-3 h produced more responding during the signal (autoshaping) than did FTs of 19 or 24 h.

  2. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  3. Adapting planning and scheduling concepts to an engineering perspective: Key issues and successful techniques

    International Nuclear Information System (INIS)

    Finnegan, J.M.

    1986-01-01

    Traditional approaches to engineering planning are slanted toward the formats and interests of downstream implementation, and do not always consider the form and criticality of the front-end engineering development process. These processes and scopes are less defined and more subjective than most construction and operations tasks, and require flexible scheduling methods. This paper discusses the characteristics and requirement of engineering schedules, presents concepts for approaching planning in this field, and illustrates simple methods for developing and analyzing engineering plans, and evaluating schedule performance. Engineering plans are structured into a schedule hierarchy which delineates appropriate control and responsibilities, and is governed by key evaluation and decision milestones. Schedule risk analysis considers the uncertainty of engineering tasks, and critical resource constraints. Methods to evaluate schedule performance recognize that engineers and managers are responsible for adequate planning and forecasting, and quality decisions, even if they cannot control all factors influencing schedule results

  4. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  5. Does self-scheduling increase nurses' job satisfaction? An integrative literature review.

    Science.gov (United States)

    Koning, Clare

    2014-09-25

    Flexible work schedules give nurses the freedom and control to manage the demands of work and home, allow organisations to meet their staffing needs and can improve job satisfaction. This article reports the results of an integrative review of published peer-reviewed research and personal narratives that examined nurses' perceptions of the relationship between job satisfaction and a self-scheduling system. Results suggest that self-scheduling is one of a number of factors that influence job satisfaction, but that implementing and sustaining such a system can be challenging. The review also found that self-scheduling programmes underpin more flexible work schedules and can benefit nurses and their organisations.

  6. Modeling of Agile Intelligent Manufacturing-oriented Production Scheduling System

    Institute of Scientific and Technical Information of China (English)

    Zhong-Qi Sheng; Chang-Ping Tang; Ci-Xing Lv

    2010-01-01

    Agile intelligent manufacturing is one of the new manufacturing paradigms that adapt to the fierce globalizing market competition and meet the survival needs of the enterprises, in which the management and control of the production system have surpassed the scope of individual enterprise and embodied some new features including complexity, dynamicity, distributivity, and compatibility. The agile intelligent manufacturing paradigm calls for a production scheduling system that can support the cooperation among various production sectors, the distribution of various resources to achieve rational organization, scheduling and management of production activities. This paper uses multi-agents technology to build an agile intelligent manufacturing-oriented production scheduling system. Using the hybrid modeling method, the resources and functions of production system are encapsulated, and the agent-based production system model is established. A production scheduling-oriented multi-agents architecture is constructed and a multi-agents reference model is given in this paper.

  7. Master schedule for CY-1982 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites

  8. Distributed continuous energy scheduling for dynamic virtual power plants

    International Nuclear Information System (INIS)

    Niesse, Astrid

    2015-01-01

    This thesis presents DynaSCOPE as distributed control method for continuous energy scheduling for dynamic virtual power plants (DVPP). DVPPs aggregate the flexibility of distributed energy units to address current energy markets. As an extension of the Virtual Power Plant concept they show high dynamics in aggregation and operation of energy units. Whereas operation schedules are set up for all energy units in a day-ahead planning procedure, incidents may render these schedules infeasible during execution, like deviation from prognoses or outages. Thus, a continuous scheduling process is needed to ensure product fulfillment. With DynaSCOPE, software agents representing single energy units solve this problem in a completely distributed heuristic approach. Using a stepped concept, several damping mechanisms are applied to allow minimum disturbance while continuously trying to fulfill the product as contracted at the market.

  9. Design Principles and Algorithms for Air Traffic Arrival Scheduling

    Science.gov (United States)

    Erzberger, Heinz; Itoh, Eri

    2014-01-01

    This report presents design principles and algorithms for building a real-time scheduler of arrival aircraft based on a first-come-first-served (FCFS) scheduling protocol. The algorithms provide the conceptual and computational foundation for the Traffic Management Advisor (TMA) of the Center/terminal radar approach control facilities (TRACON) automation system, which comprises a set of decision support tools for managing arrival traffic at major airports in the United States. The primary objective of the scheduler is to assign arrival aircraft to a favorable landing runway and schedule them to land at times that minimize delays. A further objective of the scheduler is to allocate delays between high-altitude airspace far away from the airport and low-altitude airspace near the airport. A method of delay allocation is described that minimizes the average operating cost in the presence of errors in controlling aircraft to a specified landing time. This report is a revision of an earlier paper first presented as part of an Advisory Group for Aerospace Research and Development (AGARD) lecture series in September 1995. The authors, during vigorous discussions over the details of this paper, felt it was important to the air-trafficmanagement (ATM) community to revise and extend the original 1995 paper, providing more detail and clarity and thereby allowing future researchers to understand this foundational work as the basis for the TMA's scheduling algorithms.

  10. Greater retention in care among adolescents on antiretroviral treatment accessing "Teen Club" an adolescent-centred differentiated care model compared with standard of care: a nested case-control study at a tertiary referral hospital in Malawi.

    Science.gov (United States)

    MacKenzie, Rachel K; van Lettow, Monique; Gondwe, Chrissie; Nyirongo, James; Singano, Victor; Banda, Victor; Thaulo, Edith; Beyene, Teferi; Agarwal, Mansi; McKenney, Allyson; Hrapcak, Susan; Garone, Daniela; Sodhi, Sumeet K; Chan, Adrienne K

    2017-11-01

    There are numerous barriers to the care and support of adolescents living with HIV (ALHIV) that makes this population particularly vulnerable to attrition from care, poor adherence and virological failure. In 2010, a Teen Club was established in Zomba Central Hospital (ZCH), Malawi, a tertiary referral HIV clinic. Teen Club provides ALHIV on antiretroviral treatment (ART) with dedicated clinic time, sexual and reproductive health education, peer mentorship, ART refill and support for positive living and treatment adherence. The purpose of this study was to evaluate whether attending Teen Club improves retention in ART care. We conducted a nested case-control study with stratified selection, using programmatic data from 2004 to 2015. Cases (ALHIV not retained in care) and controls (ALHIV retained in care) were matched by ART initiation age group. Patient records were reviewed retrospectively and subjects were followed starting in March 2010, the month in which Teen Club was opened. Follow-up ended at the time patients were no longer considered retained in care or on 31 December 2015. Cases and controls were drawn from a study population of 617 ALHIV. Of those, 302 (48.9%) participated in at least two Teen Club sessions. From the study population, 135 (non-retained) cases and 405 (retained) controls were selected. In multivariable analyses, Teen Club exposure, age at the time of selection and year of ART initiation were independently associated with attrition. ALHIV with no Teen Club exposure were less likely to be retained than those with Teen Club exposure (adjusted odds ratio (aOR) 0.27; 95% CI 0.16, 0.45) when adjusted for sex, ART initiation age, current age, reason for ART initiation and year of ART initiation. ALHIV in the age group 15 to 19 were more likely to have attrition from care than ALHIV in the age group 10 to 14 years of age (aOR 2.14; 95% CI 1.12, 4.11). This study contributes to the limited evidence evaluating the effectiveness of service delivery

  11. Safety and immune response to a challenge dose of hepatitis B vaccine in healthy children primed 10years earlier with hexavalent vaccines in a 3, 5, 11-month schedule: An open-label, controlled, multicentre trial in Italy.

    Science.gov (United States)

    Zanetti, Alessandro; Desole, Maria Giuseppina; Romanò, Luisa; d'Alessandro, Antonio; Conversano, Michele; Ferrera, Giuseppe; Panico, Maria Grazia; Tomasi, Alberto; Zoppi, Giorgio; Zuliani, Massimo; Thomas, Stéphane; Soubeyrand, Benoît; Eymin, Cécile; Lockhart, Stephen

    2017-07-13

    The strategy of vaccinating infants to prevent hepatitis B virus infection in adolescence or adulthood requires durable immunity. This study investigated responses to a challenge dose of monovalent hepatitis B vaccine in children primed with three doses of either Hexavac® or Infanrix hexa® 10years earlier during infancy. This open-label, controlled, multicentre study conducted in Italy, enrolled 751 healthy pre-adolescents (aged 11-13years) who were given either Hexavac (n=409) or Infanrix hexa (n=342) at 3, 5 and 11months of life. All participants received a challenge dose of a monovalent hepatitis B vaccine (HBVaxPro® 5µg). The concentrations of antibodies to hepatitis B surface antigen (anti-HBs) were measured before and 1month after the challenge dose. The analysis was descriptive and no formal hypothesis was tested. One month post-challenge, 331 participants in the Hexavac cohort [83.6%, 95% CI: 79.6; 87.1] and 324 in the Infanrix hexa cohort [96.4%, 95% CI: 93.8; 98.1] had anti-HBs concentrations ≥10mIU/mL. Before the challenge dose, an anti-HBs concentration of ≥10mIU/mL was found in 94 children in the Hexavac cohort [23.9%, 95% CI: 19.7; 28.4] and in 232 children in the Infanrix hexa cohort [69%, 95% CI: 63.8; 74.0]. Among children with a pre-challenge anti-HBs concentration of children (>80%) at least 10years after a two-dose primary and booster vaccination schedule with a hexavalent vaccine (Hexavac or Infanrix hexa). EudraCT Number: 2013-001602-28; clinicaltrials.gov: NCT02012998. Copyright © 2017 Elsevier Ltd. All rights reserved.

  12. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  13. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  14. How useful are preemptive schedules?

    NARCIS (Netherlands)

    Brucker, P.; Heitmann, S.; Hurink, J.L.

    2001-01-01

    Machine scheduling admits two options to process jobs. In a preemptive mode processing may be interrupted and resumed later even on a different machine. In a nonpreemptive mode interruptions are not allowed. Usually, the possibility to preempt jobs leads to better performance values. However, also

  15. Interaction in activity location scheduling

    NARCIS (Netherlands)

    Tabak, V.; Vries, de B.; Dijkstra, J.; Jessurun, A.J.

    2006-01-01

    In this paper we discuss the interaction in activity location scheduling which is the main subject of an ongoing research project called "User Simulation of Space Utilization". The aim of this research project is to develop an overall model for the simulation of human movement and utilization of

  16. Scheduling with target start times

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.; Klein Haneveld, W.K.; Vrieze, O.J.; Kallenberg, L.C.M.

    1997-01-01

    We address the single-machine problem of scheduling n independent jobs subject to target start times. Target start times are essentially release times that may be violated at a certain cost. The goal is to minimize an objective function that is composed of total completion time and maximum

  17. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  18. Flexible Schedules and Shift Work.

    Science.gov (United States)

    Beers, Thomas M.

    2000-01-01

    Flexible work hours have gained prominence, as more than 25 million workers (27.6% of all full-time workers) can now vary their schedules. However, there has been little change since the mid-1980s in the proportion who work a shift other than a regular daytime shift. (JOW)

  19. Scheduling periodic tasks with slack

    NARCIS (Netherlands)

    Korst, J.H.M.; Aarts, E.H.L.; Lenstra, J.K.

    1997-01-01

    We consider the problem of nonpreemptively scheduling periodic tasks on a minimum number of identical processors, assuming that some slack is allowed in the time between successive executions of a periodic task. We prove that the problem is NP-hard in the strong sense. Necessary and sufficient

  20. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    replace earlier versions of the F/A-18. Joint and International Nature At the time of JSF conception, there was a clear preference at the highest levels...ALPHABET SOUP ” (Aboulafia, 2015) OF STUDIES AND CONCEPTS • … MERGED INTO JAST • … WHICH EVOLVED TO JSF • WELL-KNOWN COST AND SCHEDULE

  1. Analyzing NPS Scheduling Using OSIRIS

    Science.gov (United States)

    1993-03-01

    School TEACHER SCHEDULE BLOCKS REPORT Date: 2/19/93 Period Name ID Term Days 1234 Adragna , Joe 170401 1 F xx Agrawal, Brij 120101 1 F xx Almquist...LOAD REPORT Date: 3/18/93 Total Max Consec Total Teacher ID Term Classes Classes Stud Adragna , Joe 170401 1 1 1 3 Agrawal, Brij 120101 1 2 2 98 Aiello

  2. Overview of Milestone E activities, greater confinement than shallow land burial

    International Nuclear Information System (INIS)

    Mezga, L.J.

    1981-01-01

    In summary, the objective of Milestone E is to provide the technology and documentation needed to open a site providing greater confinement than shallow land burial. To that end, ORNL has prepared a technical position paper defining greater confinement disposal, options for achieving it, and the need for this disposal technology. In order to meet the objective of the milestones, the LLWMP evaluated the full range of options to shallow land burial and decided to focus on a combination of greater depth solidification containment and engineered barriers. The program identified a series of research needs and then focused program efforts on resolving those needs. These tasks are proceeding on schedule at this time but budget reductions may have an impact on our ability to maintain the schedule

  3. Greater trochanteric pain syndrome diagnosis and treatment.

    Science.gov (United States)

    Mallow, Michael; Nazarian, Levon N

    2014-05-01

    Lateral hip pain, or greater trochanteric pain syndrome, is a commonly seen condition; in this article, the relevant anatomy, epidemiology, and evaluation strategies of greater trochanteric pain syndrome are reviewed. Specific attention is focused on imaging of this syndrome and treatment techniques, including ultrasound-guided interventions. Copyright © 2014 Elsevier Inc. All rights reserved.

  4. Reduced labor and condensed schedules with cellular concrete solutions

    Energy Technology Data Exchange (ETDEWEB)

    Lavis, D. [CEMATRIX Inc., Calgary, AB (Canada)

    2008-07-01

    This paper discussed the use of cellular concrete materials in oil sands tank base foundation systems, shallow buried utility insulation systems, roadways, slabs, and buried modules. The concrete is formed from Portland cement, water, specialized pre-formed foaming agents, and air mixed in controlled proportions. Fly ash and polypropylene or glass fibers can also be used as additions. Cellular concrete can often be used to speed up construction and minimize labour requirements. Cellular concrete can be cast-in-place, and has soil-stabilizing and self-compacting features. The concrete can be produced and placed on-site at rates exceeding 120 cubic meters per hour. Cellular concrete can be pumped into place over long distances through flexible hoses. A case study comparing the cellular concrete to traditional plastic foam insulation was used to demonstrate the equivalency and adequacy of insulation, structural properties and installation costs. The study showed that although the cellular concrete had a high installation cost, greater compressive strength was gained. The concrete was self-levelling and did not require compaction or vibration. The use of the cellular concrete resulted in an accelerated construction schedule. 6 refs., 2 tabs., 6 figs.

  5. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  6. Environmental monitoring master sampling schedule: January--December 1989

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1989-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1989 for the Surface and Ground-Water Environmental Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. This schedule includes routine ground-water sampling performed by PNL for Westinghouse Hanford Company, but does not include samples that may be collected in 1989 to support special studies or special contractor projects, or for quality control. The sampling schedule for Site-wide chemical monitoring is not included here, because it varies each quarter as needed, based on past results and operating needs. This schedule does not include Resource Conservation and Recovery Act ground-water sampling performed by PNL for Hanford Site contractors, nor does it include sampling that may be done by other DOE Hanford contractors

  7. Scheduling Accessory Assists Patients with Cognitive Disorders

    Science.gov (United States)

    2007-01-01

    Recom Technologies Inc. received initial funding from NASA to research the commercial potential of an artificially intelligent planning reaction model to serve as a tool to help individuals suffering from various forms and levels of brain impairment. In 1993, the chief of the Artificial Intelligence Research Branch at Ames Research Center suggested collaborative research with Santa Clara Valley Medical Center. This partnership led to further development of the technology and funding to support clinical research from the U.S. Department of Education's National Institute on Disability and Rehabilitation Research. In 1996, Attention Control Systems Inc. was founded to market the finished device, called the Planning and Execution Assistant and Trainer (PEAT). PEAT is a pocket-sized PDA-like device with a graphical display, touchscreen controls, an electronic calendar, an address book, and a built-in phone, that cues users to start or stop scheduled activities, monitors their progress, and adjusts schedules as necessary in response to delays or calendar changes. It uses an automatic planning model developed for NASA to adjust daily plans when a situation changes. PEAT is sold as a complete system that includes software, hardware, documentation, and technical support. In addition to the flagship Pocket PEAT device, there is PEAT Phone, PC PEAT, and PEAT Link. Clinical studies of PEAT continue at Santa Clara Valley Medical Center

  8. Verification and simulation analysis of wind turbine control based on linear parameter varying gain scheduling%基于LPV增益调度的风电机组控制验证与仿真分析

    Institute of Scientific and Technical Information of China (English)

    邓英; 周峰; 陈忠雷; 田德; 高尚

    2016-01-01

    With the installed capacity of wind turbines increasing, the wind turbine output characteristics and optimal operation obtain much more concerns in the industry. This paper discusses the influence of wind turbulence on the performance of wind turbines. Wind turbine is a complex nonlinear system. Due to structure load coupling, wind variation and pitch actions, the parameters of aerodynamic subsystem are changing with operation state. Usually, PI (proportional integral) control algorithm is satisfied for a linear time invariant system. To obtain better performance, a nonlinear system needs an advanced control algorithm. To address this issue, we propose a linear parameter varying (LPV) gain scheduling control to mitigate the influence of wind turbulence on wind turbine performance.At different wind speed with variable pitch and rotor speed, the LPV control can adjust feedback gain to satisfy the changing operation point. First, we introduce the stability of LPV system and LPV controller design process. Once the stability conditions are reached, the closed-loop system is stable. Then, we derive a control model with a 2 MW wind turbine based on an actual double-fed induction generator. The input is a recommended turbulence model, Kaimal. In order to check the simulation model, the field data are compared with simulation results. The generator power and torque have similar statistic characteristics. So the model is suitable for simulation and the simulation results are credible. According to the analysis of field data, wind turbulence has a great impact on wind turbine performance, such as fatigue damage of gearbox and decreasing power generation efficiency. Therefore the economic benefits are reduced in the entire lifetime of wind turbine. Simulation results of LPV control algorithm and PI control algorithm are obtained by the software Bladed under 12 and 16 m/s wind turbulence, respectively. In time domain, the generator speed and torque are varying due to the wind

  9. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker cons...... consumption and the impact on the remaining network and the customer service level. The model is applied to 4 real cases from Maersk Line. Solutions are comparable or superior to those chosen by operations managers. Cost savings of up to 58% may be achieved.......Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  10. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  11. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  12. Preemptive scheduling in overloaded systems

    Czech Academy of Sciences Publication Activity Database

    Chrobak, M.; Epstein, L.; Noga, J.; Sgall, Jiří; van Stee, R.; Tichý, Tomáš; Vakhania, N.

    2003-01-01

    Roč. 67, č. 1 (2003), s. 183-197 ISSN 0022-0000 R&D Projects: GA ČR GA201/01/1195; GA MŠk ME 476; GA AV ČR IAA1019901; GA MŠk LN00A056 Institutional research plan: CEZ:AV0Z1019905; CEZ:AV0Z1019905 Keywords : scheduling * online algorithms * benefit Subject RIV: BA - General Mathematics Impact factor: 0.795, year: 2003

  13. WCET Analysis for Preemptive Scheduling

    OpenAIRE

    Altmeyer, Sebastian; Gebhard, Gernot

    2008-01-01

    Hard real-time systems induce strict constraints on the timing of the task set. Validation of these timing constraints is thus a major challenge during the design of such a system. Whereas the derivation of timing guarantees must already be considered complex if tasks are running to completion, it gets even more complex if tasks are scheduled preemptively -- especially due to caches, deployed to improve the average performance. In this paper we propose a new method to compu...

  14. Scheduling Maintenance Jobs in Networks

    OpenAIRE

    Abed, Fidaa; Chen, Lin; Disser, Yann; Groß, Martin; Megow, Nicole; Meißner, Julie; Richter, Alexander T.; Rischke, Roman

    2017-01-01

    We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time; for the special case of path networks, this is related to the problem of minimizing the busy time of machines. We show that the problem can be solved in polynomial time in arbitrary networks if preemption is allowed. If preemption is restricted to integral t...

  15. Broadcast scheduling for mobile advertising

    OpenAIRE

    De Reyck, B.; Degraeve, Z.

    2003-01-01

    We describe a broadcast scheduling system developed for a precision marketing firm specialized in location-sensitive permission-based mobile advertising using SMS (Short Message Service) text messaging. Text messages containing advertisements were sent to registered customers when they were shopping in one of two shopping centers in the vicinity of London. The ads typically contained a limited-time promotional offer. The company's problem was deciding which ads to send out to which customers ...

  16. Schedule of the nuclear program

    International Nuclear Information System (INIS)

    Heigl, F.

    1977-01-01

    The lecure tries to explain the main phases which must be passed to establish nuclear power plants, the feasibility phase, preconstruction and construction phase. Each phase consists of a lot of activities which are commented. Further the lecture tries to give some ideas of durances and dependence between the phases or activities to get a complete time schedule of the realization of a nuclear power project. (HP) [de

  17. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  18. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  19. 12-hour-shift plant schedule improves operator productivity

    International Nuclear Information System (INIS)

    Gould, S.

    1989-01-01

    Twelve-hour scheduling has been a mainstay of the petrochemical industry, is common in the papermill industry, and is relatively new to the nuclear utility industry. A review of industry experiences, research, and a federal Nuclear Regulatory Commission (NRC) study of the 12-hour shift (NUREG/CR-4248) demonstrate that the advantages outweigh the disadvantages. The primary advantages are greater job satisfaction, fewer errors, and the better communications inherent in two shift turnovers versus three. Several companies that implemented the 12-hour shift found an increase in employee morale, no adverse effect on worker health, and no decline in safety. They experienced greater productivity, fewer operator errors, and better communication

  20. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  1. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  2. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  3. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  4. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  5. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  6. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  7. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  8. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  9. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  10. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  11. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  12. Simultaneous bilateral isolated greater trochanter fracture

    Directory of Open Access Journals (Sweden)

    Maruti Kambali

    2013-01-01

    Full Text Available A 48-year-old woman sustained simultaneous isolated bilateral greater trochanteric fracture, following a road traffic accident. The patient presented to us 1 month after the injury. She presented with complaints of pain in the left hip and inability to walk. Roentgenograms revealed displaced comminuted bilateral greater trochanter fractures. The fracture of the left greater trochanter was reduced and fixed internally using the tension band wiring technique. The greater trochanter fracture on the right side was asymptomatic and was managed conservatively. The patient regained full range of motion and use of her hips after a postoperative follow-up of 6 months. Isolated fractures of the greater trochanter are unusual injuries. Because of their relative rarity and the unsettled controversy regarding their etiology and pathogenesis, several methods of treatment have been advocated. Furthermore, the reports of this particular type of injury are not plentiful and the average textbook coverage afforded to this entity is limited. In our study we discuss the mechanism of injury and the various treatment options available.

  13. Optimal Time-Abstract Schedulers for CTMDPs and Markov Games

    Directory of Open Access Journals (Sweden)

    Markus Rabe

    2010-06-01

    Full Text Available We study time-bounded reachability in continuous-time Markov decision processes for time-abstract scheduler classes. Such reachability problems play a paramount role in dependability analysis and the modelling of manufacturing and queueing systems. Consequently, their analysis has been studied intensively, and techniques for the approximation of optimal control are well understood. From a mathematical point of view, however, the question of approximation is secondary compared to the fundamental question whether or not optimal control exists. We demonstrate the existence of optimal schedulers for the time-abstract scheduler classes for all CTMDPs. Our proof is constructive: We show how to compute optimal time-abstract strategies with finite memory. It turns out that these optimal schedulers have an amazingly simple structure---they converge to an easy-to-compute memoryless scheduling policy after a finite number of steps. Finally, we show that our argument can easily be lifted to Markov games: We show that both players have a likewise simple optimal strategy in these more general structures.

  14. Time-critical multirate scheduling using contemporary real-time operating system services

    Science.gov (United States)

    Eckhardt, D. E., Jr.

    1983-01-01

    Although real-time operating systems provide many of the task control services necessary to process time-critical applications (i.e., applications with fixed, invariant deadlines), it may still be necessary to provide a scheduling algorithm at a level above the operating system in order to coordinate a set of synchronized, time-critical tasks executing at different cyclic rates. The scheduling requirements for such applications and develops scheduling algorithms using services provided by contemporary real-time operating systems.

  15. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  16. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  17. Nonstandard Work Schedules, Family Dynamics, and Mother-Child Interactions During Early Childhood.

    Science.gov (United States)

    Prickett, Kate C

    2018-03-01

    The rising number of parents who work nonstandard schedules has led to a growing body of research concerned with what this trend means for children. The negative outcomes for children of parents who work nonstandard schedules are thought to arise from the disruptions these schedules place on family life, and thus, the types of parenting that support their children's development, particularly when children are young. Using a nationally representative sample of two-parent families (Early Childhood Longitudinal Study-Birth cohort, n = 3,650), this study examined whether mothers' and their partners' nonstandard work schedules were associated with mothers' parenting when children were 2 and 4 years old. Structural equation models revealed that mothers' and their partners' nonstandard work schedules were associated with mothers' lower scores on measures of positive and involved parenting. These associations were mediated by fathers' lower levels of participation in cognitively supportive parenting and greater imbalance in cognitively supportive tasks conducted by mothers versus fathers.

  18. How Should School Districts Shape Teacher Salary Schedules? Linking School Performance to Pay Structure in Traditional Compensation Schemes

    Science.gov (United States)

    Grissom, Jason A.; Strunk, Katharine O.

    2012-01-01

    This study examines the relative distribution of salary schedule returns to experience for beginning and veteran teachers. We argue that districts are likely to benefit from structuring salary schedules with greater experience returns early in the teaching career. To test this hypothesis, we match salary data to school-level student performance…

  19. Optimizing Unmanned Aircraft System Scheduling

    Science.gov (United States)

    2008-06-01

    ASC-U uses a deterministic algorithm to optimize over a given finite time horizon to obtain near-optimal UAS mission area assignments. ASC-U...the details of the algorithm . We set an upper bound on the total number of schedules that can be generated, so as not to create unsolvable ILPs. We...COL_MISSION_NAME)) If Trim( CStr (rMissions(iRow, COL_MISSION_REQUIRED))) <> "" Then If CLng(rMissions(iRow, COL_MISSION_REQUIRED)) > CLng

  20. Greater trochanteric fracture with occult intertrochanteric extension.

    Science.gov (United States)

    Reiter, Michael; O'Brien, Seth D; Bui-Mansfield, Liem T; Alderete, Joseph

    2013-10-01

    Proximal femoral fractures are frequently encountered in the emergency department (ED). Prompt diagnosis is paramount as delay will exacerbate the already poor outcomes associated with these injuries. In cases where radiography is negative but clinical suspicion remains high, magnetic resonance imaging (MRI) is the study of choice as it has the capability to depict fractures which are occult on other imaging modalities. Awareness of a particular subset of proximal femoral fractures, namely greater trochanteric fractures, is vital for both radiologists and clinicians since it has been well documented that they invariably have an intertrochanteric component which may require surgical management. The detection of intertrochanteric or cervical extension of greater trochanteric fractures has been described utilizing MRI but is underestimated with both computed tomography (CT) and bone scan. Therefore, if MRI is unavailable or contraindicated, the diagnosis of an isolated greater trochanteric fracture should be met with caution. The importance of avoiding this potential pitfall is demonstrated in the following case of an elderly woman with hip pain and CT demonstrating an isolated greater trochanteric fracture who subsequently returned to the ED with a displaced intertrochanteric fracture.

  1. Greater Somalia, the never-ending dream?

    DEFF Research Database (Denmark)

    Zoppi, Marco

    2015-01-01

    This paper provides an historical analysis of the concept of Greater Somalia, the nationalist project that advocates the political union of all Somali-speaking people, including those inhabiting areas in current Djibouti, Ethiopia and Kenya. The Somali territorial unification project of “lost...

  2. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  3. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  4. 76 FR 40306 - Harmonizing Schedule I Drug Requirements

    Science.gov (United States)

    2011-07-08

    ... an amphetamine, narcotic, or any habit-forming drug, are not medically qualified to operate a... of the 1984 Act also grants the Secretary broad power in carrying out motor carrier safety statutes...: Controlled substances on the DEA Schedule I, amphetamines, narcotics, or other habit-forming drugs. Section...

  5. Evaluating irrigation scheduling of hydroponic tomato in Navarra, Spain

    NARCIS (Netherlands)

    Lizarraga, H.J.; Boesveld, H.; Huibers, F.P.; Robles, H.

    2003-01-01

    The correct supply of water and nutrients is important in hydroponic growing systems in order to use water efficiently, avoid stress situations, and control production. The present study was conducted to evaluate two irrigation scheduling techniques for hydroponic tomato production in Navarra,

  6. Scheduling with Optimized Communication for Time-Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    1999-01-01

    We present an approach to process scheduling for synthesis of safety-critical distributed embedded systems.Our system model captures both the flow of data and that of control. The communication model is based on a time-triggered protocol. We take into consideration overheads due to communication...

  7. Optimal Power Scheduling for an Islanded Hybrid Microgrid

    DEFF Research Database (Denmark)

    Hernández, Adriana Carolina Luna; Aldana, Nelson Leonardo Diaz; Savaghebi, Mehdi

    2016-01-01

    model, wherein the disconnection of the load and not charging the battery when there is surplus of energy are penalized while physical constraints and requirements for a feasible deployment in the real system are considered. The proposed scheduling scheme is tested using a real-time control platform (d...

  8. Human Schedule Performance, Protocol Analysis, and the "Silent Dog" Methodology

    Science.gov (United States)

    Cabello, Francisco; Luciano, Carmen; Gomez, Inmaculada; Barnes-Holmes, Dermot

    2004-01-01

    The purpose of the current experiment was to investigate the role of private verbal behavior on the operant performances of human adults, using a protocol analysis procedure with additional methodological controls (the "silent dog" method). Twelve subjects were exposed to fixed ratio 8 and differential reinforcement of low rate 3-s schedules. For…

  9. Cyclic delivery scheduling to customers with different priorities

    Directory of Open Access Journals (Sweden)

    Katarzyna Zofia Gdowska

    2013-12-01

    Full Text Available Background: In this paper a cyclic delivery scheduling problem for customers with different priorities is presented. Shops, which are provided with deliveries, are occasionally located in places which are crucial for the proper flow of traffic. In such places coordination of deliveries is crucial; therefore it allows to completely eliminate the phenomenon of the simultaneous arrivals of suppliers. Methods: In this paper the cyclic delivery scheduling problem for customers with different priorities was presented. To this theoretical problem a mix integer programming model was developed. Specific approach to the cyclic delivery scheduling problem is inspired by timetabling problem for urban public transport. Results: Mixed integer programming model was employed for solving four cases of cyclic delivery scheduling problem for customers with different priorities. When the value of the synchronization priority assigned to a single customer raised then the total number of synchronizations in the whole network decreased. In order to compare solutions a synchronization rate was utilized. A simple factor was utilized - the proportion of number of synchronizations of deliveries to a given customer to the total number of synchronizations obtained for the whole network. When the value of synchronization priority raised then the value of synchronization rate of this customer improved significantly. Conclusions: The mixed integer programming model for the cyclic delivery scheduling problem for customers with different priorities presented in this paper can be utilized for generating schedules of serving customers located in places where only one delivery can be received and unloaded at one go and where there is no space for other suppliers to wait in a queue. Such a schedule can be very useful for organizing deliveries to small shops united in a franchising network, since they operate in a way that is very similar to the network presented in this paper

  10. Responsive versus scheduled feeding for preterm infants.

    Science.gov (United States)

    Watson, Julie; McGuire, William

    2015-10-13

    Feeding preterm infants in response to their hunger and satiation cues (responsive, cue-based, or infant-led feeding) rather than at scheduled intervals might enhance infants' and parents' experience and satisfaction, help in the establishment of independent oral feeding, increase nutrient intake and growth rates, and allow earlier hospital discharge. To assess the effect of feeding preterm infants on a responsive basis versus feeding prescribed volumes at scheduled intervals on growth, duration of hospital stay, and parental satisfaction. We used the standard search strategy of the Cochrane Neonatal Review Group. This included searches of the Cochrane Central Register of Controlled Trials (CENTRAL, The Cochrane Library, Issue 9, 2015), MEDLINE (1966 to September 2015), EMBASE (1980 to September 2015), and CINAHL (1982 to September 2015), conference proceedings, previous reviews, and trial registries. Randomised controlled trials (RCTs) or quasi-RCTs that compared a policy of feeding preterm infants on a responsive basis versus feeding at scheduled intervals. Two review authors assessed trial eligibility and risk of bias and undertook data extraction independently. We analysed the treatment effects in the individual trials and reported the risk ratio and risk difference for dichotomous data and mean difference (MD) for continuous data, with respective 95% confidence intervals (CIs). We used a fixed-effect model in meta-analyses and explored the potential causes of heterogeneity in sensitivity analyses. We found nine eligible RCTs including 593 infants in total. These trials compared responsive with scheduled interval regimens in preterm infants in the transition phase from intragastric tube to oral feeding. The trials were generally small and contained various methodological weaknesses including lack of blinding and incomplete assessment of all randomised participants. Meta-analyses, although limited by data quality and availability, suggest that responsive feeding

  11. Scheduling with Bus Access Optimization for Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Eles, Petru; Doboli, Alex; Pop, Paul

    2000-01-01

    of control. Our goal is to derive a worst case delay by which the system completes execution, such that this delay is as small as possible; to generate a logically and temporally deterministic schedule; and to optimize parameters of the communication protocol such that this delay is guaranteed. We have......In this paper, we concentrate on aspects related to the synthesis of distributed embedded systems consisting of programmable processors and application-specific hardware components. The approach is based on an abstract graph representation that captures, at process level, both dataflow and the flow......, generates an efficient bus access scheme as well as the schedule tables for activation of processes and communications....

  12. An Improved Scheduling Technique for Time-Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    1999-01-01

    clock synchronization and mode changes. We have improved the quality of the schedules by introducing a new priority function that takes into consideration the communication protocol. Communication has been optimized through packaging messages into slots with a properly selected order and lengths......In this paper we present an improved scheduling technique for the synthesis of time-triggered embedded systems. Our system model captures both the flow of data and that of control. We have considered communication of data and conditions for a time-triggered protocol implementation that supports...

  13. An Adaptive Power Efficient Packet Scheduling Algorithm for Wimax Networks

    OpenAIRE

    R Murali Prasad; P. Satish Kumar

    2010-01-01

    Admission control schemes and scheduling algorithms are designed to offer QoS services in 802.16/802.16e networks and a number of studies have investigated these issues. But the channel condition and priority of traffic classes are very rarely considered in the existing scheduling algorithms. Although a number of energy saving mechanisms have been proposed for the IEEE 802.16e, to minimize the power consumption of IEEE 802.16e mobile stations with multiple real-time connections has not yet be...

  14. Multiple determinants of transfer of evaluative function after conditioning with free-operant schedules of reinforcement.

    Science.gov (United States)

    Dack, Charlotte; Reed, Phil; McHugh, Louise

    2010-11-01

    The aim of the four present experiments was to explore how different schedules of reinforcement influence schedule-induced behavior, their impact on evaluative ratings given to conditioned stimuli associated with each schedule through evaluative conditioning, and the transfer of these evaluations through derived stimulus networks. Experiment 1 compared two contrasting response reinforcement rules (variable ratio [VR], variable interval [VI]). Experiment 2 varied the response to reinforcement rule between two schedules but equated the outcome to response rate (differential reinforcement of high rate [DRH] vs. VR). Experiment 3 compared molar and molecular aspects of contingencies of reinforcement (tandem VIVR vs. tandem VRVI). Finally, Experiment 4 employed schedules that induced low rates of responding to determine whether, under these circumstances, responses were more sensitive to the molecular aspects of a schedule (differential reinforcement of low rate [DRL] vs. VI). The findings suggest that the transfer of evaluative functions is determined mainly by differences in response rate between the schedules and the molar aspects of the schedules. However, when neither schedule was based on a strong response reinforcement rule, the transfer of evaluative judgments came under the control of the molecular aspects of the schedule.

  15. Vaccinating my way--use of alternative vaccination schedules in New York State.

    Science.gov (United States)

    Nadeau, Jessica A; Bednarczyk, Robert A; Masawi, Munyaradzi R; Meldrum, Megan D; Santilli, Loretta; Zansky, Shelley M; Blog, Debra S; Birkhead, Guthrie S; McNutt, Louise-Anne

    2015-01-01

    To identify children vaccinated following an alternative vaccine schedule using immunization information system data and determine the impact of alternative schedule use on vaccine coverage. Children born in New York State, outside New York City, between January 1, 2009 and August 14, 2011 were assessed for vaccination patterns consistent with use of an alternative schedule. Children who by 9 months of age had at least 3 vaccination visits recorded in the statewide mandatory immunization information system after 41 days of age were classified as either attempting to conform to the Centers for Disease Control and Prevention published recommended vaccination schedule or an alternative schedule. The number of vaccination visits and up-to-date status at age 9 months were compared between groups. Of the 222 628 children studied, the proportion of children following an alternative schedule was 25%. These children were significantly less likely to be up-to-date at age 9 months (15%) compared with those conforming to the routine schedule (90%, P Children following an alternative schedule on average had about 2 extra vaccine visits compared with children following a routine schedule (P children in this study appear to be intentionally deviating from the routine schedule. Intentional deviation leads to poor vaccination coverage leaving children vulnerable to infection and increasing the potential for vaccine-preventable disease outbreaks. Copyright © 2015 Elsevier Inc. All rights reserved.

  16. Expatriate job performance in Greater China: Does age matter?

    DEFF Research Database (Denmark)

    Selmer, Jan; Lauring, Jakob; Feng, Yunxia

    to expatriates in Chinese societies. It is possible that older business expatriates will receive more respect and be treated with more deference in a Chinese cultural context than their apparently younger colleagues. This may have a positive impact on expatriates’ job performance. To empirically test...... this presumption, business expatriates in Greater Chine were targeted by a survey. Controlling for the potential bias of a number of background variables, results indicate that contextual/managerial performance, including general managerial functions applied to the subsidiary in Greater China, had a positive...

  17. Real-time integration of optimal generation scheduling with MPC for the energy management of a renewable hydrogen-based microgrid

    International Nuclear Information System (INIS)

    Petrollese, Mario; Valverde, Luis; Cocco, Daniele; Cau, Giorgio; Guerra, José

    2016-01-01

    Highlights: • Energy management strategy for a renewable hydrogen-based microgrid. • Integration of optimal generation scheduling with a model predictive control. • Experimental tests are carried out simulating typical summer and winter days. • Effective improvement in performance and reduction in microgrid operating cost are achieved. - Abstract: This paper presents a novel control strategy for the optimal management of microgrids with high penetration of renewable energy sources and different energy storage systems. The control strategy is based on the integration of optimal generation scheduling with a model predictive control in order to achieve both long and short-term optimal planning. In particular, long-term optimization of the various microgrid components is obtained by the adoption of an optimal generation scheduling, in which a statistical approach is used to take into account weather and load forecasting uncertainties. The real-time management of the microgrid is instead entrusted to a model predictive controller, which has the important feature of using the results obtained by the optimal generation scheduling. The proposed control strategy was tested in a laboratory-scale microgrid present at the University of Seville, which is composed of an electronic power source that emulates a photovoltaic system, a battery bank and a hydrogen production and storage system. Two different experimental tests that simulate a summer and a winter day were carried out over a 24-h period to verify the reliability and performance enhancement of the control system. Results show an effective improvement in performance in terms of reduction of the microgrid operating cost and greater involvement of the hydrogen storage system for the maintenance of a spinning reserve in batteries.

  18. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results

  19. Cooperated Bayesian algorithm for distributed scheduling problem

    Institute of Scientific and Technical Information of China (English)

    QIANG Lei; XIAO Tian-yuan

    2006-01-01

    This paper presents a new distributed Bayesian optimization algorithm (BOA) to overcome the efficiency problem when solving NP scheduling problems.The proposed approach integrates BOA into the co-evolutionary schema,which builds up a concurrent computing environment.A new search strategy is also introduced for local optimization process.It integrates the reinforcement learning(RL) mechanism into the BOA search processes,and then uses the mixed probability information from BOA (post-probability) and RL (pre-probability) to enhance the cooperation between different local controllers,which improves the optimization ability of the algorithm.The experiment shows that the new algorithm does better in both optimization (2.2%) and convergence (11.7%),compared with classic BOA.

  20. Behavioral and biological effects of autonomous versus scheduled mission management in simulated space-dwelling groups

    Science.gov (United States)

    Roma, Peter G.; Hursh, Steven R.; Hienz, Robert D.; Emurian, Henry H.; Gasior, Eric D.; Brinson, Zabecca S.; Brady, Joseph V.

    2011-05-01

    Logistical constraints during long-duration space expeditions will limit the ability of Earth-based mission control personnel to manage their astronaut crews and will thus increase the prevalence of autonomous operations. Despite this inevitability, little research exists regarding crew performance and psychosocial adaptation under such autonomous conditions. To this end, a newly-initiated study on crew management systems was conducted to assess crew performance effectiveness under rigid schedule-based management of crew activities by Mission Control versus more flexible, autonomous management of activities by the crews themselves. Nine volunteers formed three long-term crews and were extensively trained in a simulated planetary geological exploration task over the course of several months. Each crew then embarked on two separate 3-4 h missions in a counterbalanced sequence: Scheduled, in which the crews were directed by Mission Control according to a strict topographic and temporal region-searching sequence, and Autonomous, in which the well-trained crews received equivalent baseline support from Mission Control but were free to explore the planetary surface as they saw fit. Under the autonomous missions, performance in all three crews improved (more high-valued geologic samples were retrieved), subjective self-reports of negative emotional states decreased, unstructured debriefing logs contained fewer references to negative emotions and greater use of socially-referent language, and salivary cortisol output across the missions was attenuated. The present study provides evidence that crew autonomy may improve performance and help sustain if not enhance psychosocial adaptation and biobehavioral health. These controlled experimental data contribute to an emerging empirical database on crew autonomy which the international astronautics community may build upon for future research and ultimately draw upon when designing and managing missions.