WorldWideScience

Sample records for general contracting requirements

  1. 24 CFR 232.605 - Contract requirements.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the...

  2. 7 CFR 1468.21 - Contract requirements.

    Science.gov (United States)

    2010-01-01

    ... net environmental and societal benefits; (ii) Refund with interest any program payments received and... under the CFO contract; (v) Supply information as required by CCC to determine compliance with the...

  3. 5 CFR 300.405 - Requirement for contract.

    Science.gov (United States)

    2010-01-01

    ... principles and equal opportunity laws. ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Requirement for contract. 300.405 Section... (GENERAL) Use of Commercial Recruiting Firms and Nonprofit Employment Services § 300.405 Requirement for...

  4. 20 CFR 726.201 - Insurance contracts-generally.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Insurance contracts-generally. 726.201 Section 726.201 Employees' Benefits EMPLOYMENT STANDARDS ADMINISTRATION, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR...

  5. 29 CFR 4.146 - Contract obligations after award, generally.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Contract obligations after award, generally. 4.146 Section 4.146 Labor Office of the Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Period of Coverage § 4.146 Contract obligations after...

  6. A general approach to posterior contraction in nonparametric inverse problems

    NARCIS (Netherlands)

    Knapik, Bartek; Salomond, Jean Bernard

    In this paper, we propose a general method to derive an upper bound for the contraction rate of the posterior distribution for nonparametric inverse problems. We present a general theorem that allows us to derive contraction rates for the parameter of interest from contraction rates of the related

  7. Afghan Air Force University: Contract Requirements Were Generally Met, but Instances of Non Compliance, Poor Workmanship, and Inadequate Maintenance Need to Be Addressed

    Science.gov (United States)

    2016-03-01

    construction, which included a kitchen with multiple ranges, food preparation areas, and a series of walk-in cold storage areas that were all completed...stairways. For example, plumbing work done in the renovated bathrooms of four existing buildings and the new kitchen /cold storage area did not...Army Corps of Engineers (USACE) awarded a nearly $10 million fixed-price, design /build contract to Technologists, Inc., a U.S. company, to construct

  8. 48 CFR 801.602-70 - General review requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false General review... AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities 801.602-70 General review requirements. (a) Contracting officers...

  9. 24 CFR 1715.4 - Contract requirements and revocation.

    Science.gov (United States)

    2010-04-01

    ... breach of contract. (b) For the purposes of this section: Damages incurred by the seller or lessor means... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Contract requirements and..., SALES PRACTICES AND STANDARDS Purchasers' Revocation Rights § 1715.4 Contract requirements and...

  10. 7 CFR 1466.21 - Contract requirements.

    Science.gov (United States)

    2010-01-01

    ... provisions of § 1466.26; (iii) Refund all program payments received on the transfer of the right and interest of the producer in land subject to the contract, unless the transferee of the right and interest... plan when the EQIP contract includes an animal waste management facility; (v) Implement a forest...

  11. HARMONIZATION OF THE CONSUMER CONTRACT DISPOSITIONS WITH THE GENERAL CONTRACT RULES

    Directory of Open Access Journals (Sweden)

    Alexandru MATEESCU

    2016-05-01

    Full Text Available This work contains and mainly tackles the contract of consumption, its differences and similitudes to a general contract, manners of applying it, and the way in which the former can be better coordinated and correlated to the general contracting terms, established by the civil law. Along the years, the consumption contract has undergone several addenda and it has come to represent an instrument of both refference and regulation for the socio-economical relations between two parties who have a commercial agreement. The general law frame has had a great influence in the development of the consumption contract, as well as on its applicability conditions and its manner of deployment. Through the development of the judicial law concerning the contract of concumption, this type of agreement has influenced, through its human and social nature, both the general contract, and the specific frame it relates to. The relationship between the two types of contract is one of interdependence, which is determined by the need of judicial regulation in the Romanian and European economy. The ceaselees development of interhuman relations pushes society towards maintaining a continuous study of the advancement of specific legislation and judicial regulation. The main purpose of this work is analyzing the general judicial frame and the way in which the differences between the general contract and the consumption one may represent a benefic and mutual influence on protecting the citizens’ rights, which in the case of the consumption contract encompasses the protection of consumers’ rights. Also, it will analyze the aspects that determine the manner of application and the the differences that can be surmounted in order to achieve a better cohesion between these types of contracts.

  12. 42 CFR 438.6 - Contract requirements.

    Science.gov (United States)

    2010-10-01

    ... specific to the enrolled population, by— (A) Eligibility category; (B) Age; (C) Gender; (D) Locality/region... adjustments for GME. (d) Enrollment discrimination prohibited. Contracts with MCOs, PIHPs, PAHPs, and PCCMs... activities); the Age Discrimination Act of 1975; the Rehabilitation Act of 1973; and the Americans with...

  13. Notice Requirements in Federal Acquisition Contracts.

    Science.gov (United States)

    1985-01-01

    oo o e o e *4 16 Development of the Court of Claims Dootrine....48 2. Impact of the Contract Disputes Act............ 56 3. Estoppel ...contractor elects Disputes Clause procedures, the waiver doctrine of Maney and Tapper is now a dead letter. 3. Estoppel Even though the government may...tative might give rise to a situation where the doctrine of equitable estoppel would preclude enforcement of the appeal period limitation. Prior to

  14. Fluor Daniel Hanford contract standards/requirements identification document

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, G.L.

    1997-04-24

    This document, the Standards/Requirements Identification Document (S/RID) for the Fluor Daniel Hanford Contract, represents the necessary and sufficient requirements to provide an adequate level of protection of the worker, public health and safety, and the environment.

  15. 14 CFR 1204.403 - General requirements.

    Science.gov (United States)

    2010-01-01

    ... transaction has already been set-aside for small business by the contracting officer. (b) The appropriate... conferences and training sessions to inform small businesses of contracting opportunities with the Agency. (e) In accordance with Public Law 95-507, NASA will require contractors having contracts in excess of $1...

  16. 78 FR 80369 - Federal Acquisition Regulation; Service Contracts Reporting Requirements

    Science.gov (United States)

    2013-12-31

    ... (e.g., cost-reimbursement, time-and- materials, and labor-hour contracts), which already require... contract costs and labor can significantly fluctuate each year or how this type of labor can be comingled... of direct labor hours expended on the services performed is extremely concerning, particularly in a...

  17. A Study of Placing Army Requirements on Contract

    Science.gov (United States)

    2016-04-01

    the program office in an integrated product team fashion under the leadership of the program manager. The U.S. Army contracting command is a key... fashion 46 A STUDY OF PLACING ARMY REQUIREMENTS ON CONTRACT  Our requirements can be routinely changed by the Acquisition Center. The reason for... consulted .  No, processes were unclear and if there are/were process, they were not communicated well with Program Office and even among the ACC personnel

  18. 48 CFR 9903.202-1 - General requirements.

    Science.gov (United States)

    2010-10-01

    ... ACCOUNTING STANDARDS CONTRACT COVERAGE CAS Program Requirements 9903.202-1 General requirements. (a) A... subcontract is of the type or value exempted by 9903.201-1 or (ii) In the most recently completed cost... of Germany. (3) United Kingdom. (f) Educational institutions—disclosure requirements. (1) Educational...

  19. 48 CFR 801.602-73 - Review requirements for scarce medical specialist contracts and contracts for health-care resources.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Review requirements for scarce medical specialist contracts and contracts for health-care resources. 801.602-73 Section 801.602... Responsibilities 801.602-73 Review requirements for scarce medical specialist contracts and contracts for health...

  20. Fabiola Gianotti signs her contract as CERN's new Director- General

    CERN Multimedia

    Antonella Del Rosso

    2014-01-01

    Today, 12 December 2014, Fabiola Gianotti signed her five-year contract as the new CERN Director-General. Her mandate will begin on 1 January 2016.   Fabiola Gianotti (left) and President of CERN Council Agnieszka Zalewska (right) after the signature of the contract.   The Italian physicist, Fabiola Gianotti was appointed as the Organization’s next Director-General at the 173rd Closed Session of the CERN Council on 4 November. The appointment was formalised this week at the December session of Council. More news from this week Council meetings can be found here.

  1. Smart Contract Templates: essential requirements and design options

    OpenAIRE

    Clack, Christopher D.; Bakshi, Vikram A.; Braine, Lee

    2016-01-01

    Smart Contract Templates support legally-enforceable smart contracts, using operational parameters to connect legal agreements to standardised code. In this paper, we explore the design landscape of potential formats for storage and transmission of smart legal agreements. We identify essential requirements and describe a number of key design options, from which we envisage future development of standardised formats for defining and manipulating smart legal agreements. This provides a prelimin...

  2. 75 FR 80685 - Contract Reporting Requirements of Intrastate Natural Gas Companies

    Science.gov (United States)

    2010-12-23

    ...; Order No. 735-A] Contract Reporting Requirements of Intrastate Natural Gas Companies Issued December 16... Storage Report for Intrastate Natural Gas and Hinshaw Pipelines. Order No. 735-A generally reaffirms the... reporting requirements for (1) intrastate natural gas pipelines \\2\\ providing interstate transportation...

  3. How to understand requirements of nuclear and defense welding contracts

    International Nuclear Information System (INIS)

    Dickinson, O.D.

    1986-01-01

    This paper presents a basic requirements control plan for contract documentation and software validation and maintenance for nuclear operation. The objective is designing an integrated configuration control plan of both old, new, large or small, critical and noncritical software programs. There are positive advantages to managing a planned requirements program for product delivery or business operations. A requirements baseline like this is preferable to many iterations of design effort in the maintenance of nonbaselined programs, documentation and software. The plan that applies program requirements needs to address different levels of criticality and define matching program requirements for those levels. The plan needs to describe old vs. new requirements and define scope/responsibility that is needed to support the design, development and completion of these program requirements. Presented are management goals, relative costs, quality assurance goals, and program assessment plans. Outlined is a set of program QA requirements and document/software functional requirements for planning of program; also presented are some criteria for criticality assessment to establish levels of contract documentation or software activity. The paper shows two examples of planning work on this configuration control plan. The integrated configuration control requirements plan can be computer based or paper based for activity. It is designed to cover existing or new requirements and to cover either no documentation or all documentation

  4. Harmonizing formal requirements for cross-border sales contracts

    Directory of Open Access Journals (Sweden)

    Peter Winship

    2012-07-01

    Full Text Available Legal systems have different traditions about how to “prove” a contract for the sale of personal property. Most legal systems today permit the contract to be proved by any means but some States require that the agreement be concluded in or evidenced by writing. The United Nations Convention on Contracts for the International Sale of Goods adopts a freedom-of-form rule but authorizes a State to declare that the rule does not apply when the seller or buyer has its place of business in that State. This essay studies the consequences of such a declaration. The Convention text does not expressly state the consequences. The Convention’s travaux préparatoires suggest that this silence was deliberate. Doctrine and court opinions are divided on whether the writing formalities of the declaring State always apply or the formalities, if any, of the law applicable by virtue of the rules of private international law govern. In the absence of a consensus, this essay argues that the writing formalities of the declaring State apply. The argument is based on the policies implicit in the decision of non-declaring Contracting States to adhere to a Convention that allows certain Contracting States to opt out of the freedom-of-form rule. The result is consistent with recent private international law treaties that, while providing liberal rules that favor freedom of form, direct application of the fundamental policies not only of the forum but also of other jurisdictions.

  5. General lighting requirements for photosynthesis

    Energy Technology Data Exchange (ETDEWEB)

    Geiger, D.R. [Univ. of Dayton, OH (United States)

    1994-12-31

    A review of the general lighting requirements for photosynthesis reveals that four aspects of light are important: irradiance, quality, timing and duration. These properties of light affect photosynthesis by providing the energy that drives carbon assimilation as well as by exerting control over physiology, structure and morphology of plants. Irradiance, expressed as energy flux, W m{sup -2}, or photon irradiance, {mu}mol m{sup -2} s{sup -1}, determines the rate at which energy is being delivered to the photosynthetic reaction centers. Spectral quality, the wavelength composition of light, is important because photons differ in their probability of being absorbed by the light harvesting complex and hence their ability to drive carbon assimilation. Also the various light receptors for light-mediated regulation of plant form and physiology have characteristic absorption spectra and hence photons differ in their effectiveness for eliciting responses. Duration is important because both carbon assimilation and regulation are affected by the total energy or integrated irradiance delivered during a given period. Many processes associated with photosynthesis are time-dependent, increasing or decreasing with duration. Timing is important because the effectiveness of light in the regulation of plant processes varies with the phase of the diumal cycle as determined by the plant`s time-measuring mechanisms.

  6. 48 CFR 215.404-74 - Fee requirements for cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Fee requirements for cost... NEGOTIATION Contract Pricing 215.404-74 Fee requirements for cost-plus-award-fee contracts. In developing a fee objective for cost-plus-award-fee contracts, the contracting officer shall— (a) Follow the...

  7. GENERAL ASPECTS AND PURPOSE OF THE CONSUMMATION CONTRACT

    Directory of Open Access Journals (Sweden)

    Alexandru MATEESCU

    2015-07-01

    Full Text Available The current paper mainly tackles the consummation contract and the ways in which it forms, adjusts and helps the citizen, in the general frame of the consumer’s rights. The consummation contract is a legal instrument for institutionalizing the commercial operations between a professional and the consumer. This type of instrument has been especially created to help the citizen in being adequately treated both correctly and adequately in all consummation matters. In the 20th century, the need to bring the commercial relations between professionals and citizens under regulation became imperative. Taking into account the socio-humanistic development rhythm, the consummation contact became a way of guaranteeing for the citizens’ rights in consummation matters and, at the same time, it confers a legal frame to guide and direct the merchants. Since 2007, the year when Romania adhered the European Union, the consumers’ rights became even more important, as the fact that the European Union focuses on the rights of all its citizens and the way in which they are treated by the merchants from a commercial point of view, was widely recognized. Once Romania adhered to a commercial frame which embeds over 500 million inhabitants, the dimension of the rights and obligations regarding consummation became an ever stronger argument in bringing the legislation under regulation. Eventually, clarifying the principles that founded the consummation contract will determine the legal frame in which it revolves and will bring to light the utility it has for the citizens, its subsequent employments and all things that should be further added to it in order to ensure an even better protection and settlement, in legal terms, of the commercial relations between a merchant and one or more citizens.

  8. 40 CFR 68.12 - General requirements.

    Science.gov (United States)

    2010-07-01

    ...) CHEMICAL ACCIDENT PREVENTION PROVISIONS General § 68.12 General requirements. (a) General requirements. The... the five-year accident history for the process as provided in § 68.42 of this part and submit it in... §§ 68.150 to 68.185. The RMP shall include a registration that reflects all covered processes. (b...

  9. 7 CFR 1942.117 - General requirements.

    Science.gov (United States)

    2010-01-01

    ... § 1942.117 General requirements. (a) Reserve requirements. Loans under this subpart are subject to the... 7 Agriculture 13 2010-01-01 2009-01-01 true General requirements. 1942.117 Section 1942.117 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...

  10. Fixed Point of Generalized Eventual Cyclic Gross in Fuzzy Norm Spaces for Contractive Mappings

    Directory of Open Access Journals (Sweden)

    S. A. M. Mohsenialhosseini

    2015-01-01

    Full Text Available We define generalized eventual cyclic gross contractive mapping in fuzzy norm spaces, which is a generalization of the eventual cyclic gross contractions. Also we prove the existence of a fixed point for this type of contractive mapping on fuzzy norm spaces.

  11. Management in general practice: the challenge of the new General Medical Services contract.

    Science.gov (United States)

    Checkland, Kath

    2004-10-01

    Managers in general practice perform a variety of roles, from purely administrative to higher-level strategic planning. There has been little research investigating in detail how they perform these roles and the problems that they encounter. The new General Medical Services (GMS) contract contains new management challenges and it is not clear how practices will meet these. To improve understanding of the roles performed by managers in general practice and to consider the implications of this for the implementation of the new GMS contract. In-depth qualitative case studies covering the period before and immediately after the vote in favour of the new GMS contract. Three general practices in England, chosen using purposeful sampling. Semi-structured interviews with all clinical and managerial personnel in each practice, participant and non-participant observation, and examination of documents. Understanding about what constitutes the legitimate role of managers in general practice varies both within and between practices. Those practices in the study that employed a manager to work at a strategic level with input into the direction of the organisation demonstrated significant problems with this in practice. These included lack of clarity about what the legitimate role of the manager involved, problems relating to the authority of managers in the context of a partnership, and lack of time available to them to do higher-level work. In addition, general practitioners (GPs) were not confident about their ability to manage their managers' performance. The new GMS contract will place significant demands on practice management. These results suggest that it cannot be assumed that simply employing a manager with high-level skills will enable these demands to be met; there must first be clarity about what the manager should be doing, and attention must be directed at questions about the legitimacy enjoyed by such a manager, the limits of his or her authority, and the

  12. Statutory Requirements of Teacher Contract Laws: A Comparison of the 50 States' Continuing Contract and Teacher Tenure Laws.

    Science.gov (United States)

    Gorkom, Kris Van

    This publication summarizes and compares legal provisions covering teacher tenure and contracts for each of the 50 states. The report is organized in three sections. Section 1 presents a summary comparison of the provisions of Washington's teacher contract law with corresponding statutory requirements of the other 49 states. Section 2 identifies…

  13. 40 CFR 141.70 - General requirements.

    Science.gov (United States)

    2010-07-01

    ...) NATIONAL PRIMARY DRINKING WATER REGULATIONS Filtration and Disinfection § 141.70 General requirements. (a... regulations establish criteria under which filtration is required as a treatment technique for public water... filtration requirements in § 141.73 and the disinfection requirements in § 141.72(b). (c) Each public water...

  14. 30 CFR 250.1000 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false General requirements. 250.1000 Section 250.1000... OPERATIONS IN THE OUTER CONTINENTAL SHELF Pipelines and Pipeline Rights-of-Way § 250.1000 General....1001, must meet the requirements in §§ 250.1000 through 250.1008. (2) A pipeline right-of-way grant...

  15. 21 CFR 211.180 - General requirements.

    Science.gov (United States)

    2010-04-01

    ...: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Records and Reports § 211.180 General requirements. (a) Any production, control, or distribution record that is required to be... good manufacturing practices brought by the Food and Drug Administration. [43 FR 45077, Sept. 29, 1978...

  16. Biomedicine, holism and general medical practice: responses to the 2004 General Practitioner contract.

    Science.gov (United States)

    Checkland, Kath; Harrison, Stephen; McDonald, Ruth; Grant, Suzanne; Campbell, Stephen; Guthrie, Bruce

    2008-07-01

    In 2004 a new contract was introduced for General Practitioners in the UK, which introduced a significant element of 'pay-for-performance', including both clinical and organisational targets. The introduction of this contract has caused interest across the world, particularly amongst those responsible for commissioning primary care services. It can be argued that the clinical targets in the contract (known as the Quality and Outcomes Framework, QOF) represent a move towards a more biomedical model of health and illness, which is contrary to the ideal of providing holistic (or biopsychosocial) care that has been traditionally espoused by GPs. This paper reports results from two linked studies (in England and Scotland) investigating the early stages of the new contract. We describe the way in which four practices with different organisational approaches and espoused identities have all changed their practice structures, consultations and clinical care in response to QOF in ways which will result in patients receiving a more biomedical type of care. In spite of these observed changes, respondents continued to maintain discursive claims to holism. We discuss how this disconnection between rhetoric and reality can be maintained, and consider its implications for the future development of GPs' claims to a professional identity.

  17. 30 CFR 285.436 - Can MMS require lease or grant contraction?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Can MMS require lease or grant contraction? 285... Administration Lease Or Grant Contraction § 285.436 Can MMS require lease or grant contraction? At an interval no more frequent than every 5 years, the MMS may review your lease or grant area to determine whether the...

  18. 78 FR 10174 - Public Availability of General Services Administration FY 2012 Service Contract Inventory

    Science.gov (United States)

    2013-02-13

    ... GENERAL SERVICES ADMINISTRATION [Notice-MV-2013-02; Docket No. 2013-0002; Sequence 3] Public Availability of General Services Administration FY 2012 Service Contract Inventory AGENCY: General Services Administration (GSA). ACTION: Notice of Public Availability of FY 2012 Service Contract Inventories. SUMMARY: In...

  19. Requirements on a B2B e-contract language

    NARCIS (Netherlands)

    Angelov, S.; Grefen, P.W.P.J.

    2005-01-01

    Electronic contracts are the instrument to govern electronic trading relationships between business parties. A number of efforts exist in both the academic and industrial worlds to define an e-contract specification language. However, these efforts lack either universality or completeness. The main

  20. 24 CFR 891.535 - Requirements for awarding construction contracts.

    Science.gov (United States)

    2010-04-01

    ... method of contract award under paragraph (c) of this section. In competitive bidding, sealed bids are... acceptance of such bid within a specified period after the opening, execute and deliver a contract in the... file) and that the bid is signed by a person authorized to bind the bidder. (4) Bidding shall be open...

  1. 78 FR 9865 - Air Carrier Contract Maintenance Requirements; Extension of Comment Period

    Science.gov (United States)

    2013-02-12

    .... FAA-2011-1136; Notice No. 12-07] RIN 2120-AJ33 Air Carrier Contract Maintenance Requirements... performing contract maintenance that are acceptable to the FAA and to include them in their maintenance... contract their maintenance. At the behest of several of their FAA-certificated air carrier members...

  2. 14 CFR 151.49 - Performance of construction work: Contract requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Contract... § 151.49 Performance of construction work: Contract requirements. (a) Contract provisions. In addition to any other provisions necessary to ensure completion of the work in accordance with the grant...

  3. On Meta-norms as Use Policies Constraining Contracts and Contract Requirements

    NARCIS (Netherlands)

    King, T.C.; Dignum, M.V.; Van Riemsdijk, M.B.

    2013-01-01

    In multi-agent organizations, contractual obligations and prohibitions are important for governing autonomous agents. However, agents may only wish to participate in an organization if the contracts they engage in respect and satisfy their policies specifying how the agent may be used, we call these

  4. 77 FR 67584 - Air Carrier Contract Maintenance Requirements

    Science.gov (United States)

    2012-11-13

    ... many, including air carriers lowering costs by employing fewer maintenance personnel and reducing their... make accurate risk assessments. B. History In May 1996, employees of SabreTech, a contract maintenance...-certificated repair facilities, and the air carriers' outsourcing of maintenance. In each of those reports...

  5. 48 CFR 801.690-5 - Requirements for contracting authority.

    Science.gov (United States)

    2010-10-01

    ..., purchasing, economics, industrial management, marketing, quantitative methods, or organization and management...) The Chief, ATCD, is responsible for the management of the ACEP, the program that assists contracting...) Education. (1) The 24 business-related college credits shall be in any combination of the following fields...

  6. 40 CFR 141.700 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... described in §§ 141.721 through 141.722. (7) Systems must address significant deficiencies identified in... 40 Protection of Environment 22 2010-07-01 2010-07-01 false General requirements. 141.700 Section 141.700 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...

  7. 36 CFR 72.10 - General requirements.

    Science.gov (United States)

    2010-07-01

    ..., Iowa, Kansas, Missouri, Montana, Nebraska, North Dakota, South Dakota, Utah, and Wyoming. Pacific... PARK AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.10 General requirements... Recreation Act of 1978, Pub. L. 95-625, (16 U.S.C. 2506); sec. 2 of Reorganization Plan No. 3 of 1950 (64...

  8. 19 CFR 146.21 - General requirements.

    Science.gov (United States)

    2010-04-01

    ... TREASURY (CONTINUED) FOREIGN TRADE ZONES Inventory Control and Recordkeeping System § 146.21 General requirements. (a) Systems capability. The operator shall maintain either manual or automated inventory control... English language copy of its written inventory control and recordkeeping systems procedures manual in...

  9. 36 CFR 220.4 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... natural and physical environment and the relationship of people with that environment (see 40 CFR 1508.14... for environmental assessments, findings of no significant impact and categorical exclusions (FSM 1950... ENVIRONMENTAL POLICY ACT (NEPA) COMPLIANCE § 220.4 General requirements. (a) Proposed actions subject to the...

  10. 30 CFR 57.4200 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Firefighting Equipment § 57.4200 General requirements. (a) For fighting fires that could endanger...

  11. 30 CFR 56.4200 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Fire Prevention and Control Firefighting Equipment § 56.4200 General requirements. (a) For fighting fires that could endanger...

  12. 36 CFR 72.30 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... PARK AND RECREATION RECOVERY ACT OF 1978 Grants for Recovery Action Program Development, Rehabilitation and Innovation § 72.30 General requirements. Applicants must have an approved Recovery Action Program on file with the appropriate NPS Regional Office prior to applying for Rehabilitation or Innovation...

  13. 21 CFR 211.160 - General requirements.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false General requirements. 211.160 Section 211.160 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS..., drug product container, or closure that is subject to deterioration. (2) Determination of conformance...

  14. 21 CFR 820.180 - General requirements.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false General requirements. 820.180 Section 820.180 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL... minimize deterioration and to prevent loss. Those records stored in automated data processing systems shall...

  15. 47 CFR 52.9 - General requirements.

    Science.gov (United States)

    2010-10-01

    ... telecommunications carriers; (2) Not unduly favor or disfavor any particular telecommunications industry segment or... 47 Telecommunication 3 2010-10-01 2010-10-01 false General requirements. 52.9 Section 52.9 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) NUMBERING...

  16. Fixed point theorems for generalized α -β-weakly contraction mappings in metric spaces and applications.

    Science.gov (United States)

    Latif, Abdul; Mongkolkeha, Chirasak; Sintunavarat, Wutiphol

    2014-01-01

    We extend the notion of generalized weakly contraction mappings due to Choudhury et al. (2011) to generalized α-β-weakly contraction mappings. We show with examples that our new class of mappings is a real generalization of several known classes of mappings. We also establish fixed point results for such mappings in metric spaces. Applying our new results, we obtain fixed point results on ordinary metric spaces, metric spaces endowed with an arbitrary binary relation, and metric spaces endowed with graph.

  17. 75 FR 29404 - Contract Reporting Requirements of Intrastate Natural Gas Companies

    Science.gov (United States)

    2010-05-26

    ...; Order No. 735] Contract Reporting Requirements of Intrastate Natural Gas Companies May 20, 2010. AGENCY... revises the contract reporting requirements for those natural gas pipelines that fall under the Commission's jurisdiction pursuant to section 311 of the Natural Gas Policy Act or section 1(c) of the Natural...

  18. 78 FR 32988 - Core Principles and Other Requirements for Designated Contract Markets; Correction

    Science.gov (United States)

    2013-06-03

    ... COMMODITY FUTURES TRADING COMMISSION 17 CFR Part 38 RIN 3038-AD09 Core Principles and Other... regarding Core Principles and Other Requirements for Designated Contract Markets by inserting a missing... regarding Core Principles and Other Requirements for Designated Contract Markets (77 FR 36612, June 19, 2012...

  19. 48 CFR 32.601 - General.

    Science.gov (United States)

    2010-10-01

    ... costs related to defaults in performance. (10) Breach of contract obligations concerning progress....601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Debts 32.601 General. (a) Contract debts are amounts that— (1) Have...

  20. The general principles of the Chinese contract law from the perspective of an (English) Common lawyer

    OpenAIRE

    Twigg-Flesner, Christian

    2017-01-01

    This chapter will contrast the statement of general principles found in Arts.1-7 of the Chinese Contract Law (“CCL”) with the approach to general principles of contract law in the (English) common law. The particular purpose of this paper will be on how these two contract law regimes regard contractual freedom and the extent to which there are limitations to this. It will begin with a short summary account of the CCL’s general principles. The bulk of this paper will then set out the English c...

  1. Some general requirements for irradiation experiments

    Energy Technology Data Exchange (ETDEWEB)

    Myers, H P; Skjoeldebrand, R

    1960-05-15

    This paper is limited to the interests of the EAES-symposium, namely the use of reactors for materials research and testing, for convenience we exclude consideration of chemical effects and problems of coolant technology. Its purpose is to try to define the general requirements for irradiation experiments and the reactors housing them; to see what facilities for irradiation experiments are available within the European Atomic Energy Society countries and finally, to point out possible limitations of these facilities.

  2. Common fixed points for generalized contractive mappings in cone metric spaces

    Directory of Open Access Journals (Sweden)

    Hassen Aydi

    2012-06-01

    Full Text Available The purpose of this paper is to establish coincidence point and common fixed point results for four maps satisfying generalized weak contractions in cone metric spaces. Also, an example is given to illustrate our results.

  3. REQUIREMENTS FOR A GENERAL INTERPRETATION THEORY

    Directory of Open Access Journals (Sweden)

    Anda Laura Lungu Petruescu

    2013-06-01

    Full Text Available Time has proved that Economic Analysis is not enough as to ensure all the needs of the economic field. The present study wishes to propose a new approach method of the economic phenomena and processes based on the researches made outside the economic space- a new general interpretation theory- which is centered on the human being as the basic actor of economy. A general interpretation theory must assure the interpretation of the causalities among the economic phenomena and processes- causal interpretation; the interpretation of the correlations and dependencies among indicators- normative interpretation; the interpretation of social and communicational processes in economic organizations- social and communicational interpretation; the interpretation of the community status of companies- transsocial interpretation; the interpretation of the purposes of human activities and their coherency – teleological interpretation; the interpretation of equilibrium/ disequilibrium from inside the economic systems- optimality interpretation. In order to respond to such demands, rigor, pragmatism, praxiology and contextual connectors are required. In order to progress, the economic science must improve its language, both its syntax and its semantics. The clarity of exposure requires a language clarity and the scientific theory progress asks for the need of hypotheses in the building of the theories. The switch from the common language to the symbolic one means the switch from ambiguity to rigor and rationality, that is order in thinking. But order implies structure, which implies formalization. Our paper should be a plea for these requirements, requirements which should be fulfilled by a modern interpretation theory.

  4. 41 CFR 102-38.315 - Are we required to use Alternative Disputes Resolution for sales contracts?

    Science.gov (United States)

    2010-07-01

    ... Alternative Disputes Resolution for sales contracts? 102-38.315 Section 102-38.315 Public Contracts and... required to use Alternative Disputes Resolution for sales contracts? No, you are not required to use Alternative Disputes Resolution (ADR) for sales contracts. However, you are encouraged to use ADR procedures...

  5. 77 FR 5253 - Public Availability of General Services Administration FY 2011 Service Contract Inventory

    Science.gov (United States)

    2012-02-02

    ... GENERAL SERVICES ADMINISTRATION [Notice-MV-2012-01; Docket 2012-0002; Sequence 3] Public Availability of General Services Administration FY 2011 Service Contract Inventory AGENCY: Office of Acquisition Policy (MV); General Services Administration (GSA). ACTION: Notice of public availability of FY...

  6. 76 FR 5375 - Public Availability of General Services Administration FY 2010 Service Contract Inventory

    Science.gov (United States)

    2011-01-31

    ... GENERAL SERVICES ADMINISTRATION [2011-MV-1; Docket No. 2011-0006; Sequence 4] Public Availability of General Services Administration FY 2010 Service Contract Inventory AGENCY: Office of Acquisition Policy; General Services Administration (GSA). ACTION: Notice. SUMMARY: This notice announces that GSA is...

  7. 75 FR 80571 - Core Principles and Other Requirements for Designated Contract Markets

    Science.gov (United States)

    2010-12-22

    ... Part II Commodity Futures Trading Commission 17 CFR Parts 1, 16, and 38 Core Principles and Other... CFR Parts 1, 16, and 38 RIN 3038-AD09 Core Principles and Other Requirements for Designated Contract... Principles 1. Subpart B--Designation as Contract Market 2. Subpart C--Compliance With Rules i. Proposed Sec...

  8. 48 CFR 1352.237-72 - Security processing requirements-national security contracts.

    Science.gov (United States)

    2010-10-01

    ... requirements-national security contracts. 1352.237-72 Section 1352.237-72 Federal Acquisition Regulations... Provisions and Clauses 1352.237-72 Security processing requirements—national security contracts. As prescribed in 48 CFR 1337.110-70(d), use the following clause: Security Processing Requirements—National...

  9. 14 CFR 151.45 - Performance of construction work: General requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: General... § 151.45 Performance of construction work: General requirements. (a) All construction work under a... work under a project until— (1) The sponsor has furnished three conformed copies of the contract to the...

  10. A new iteration process for generalized lipschitz pseudo-contractive and generalized lipschitz accretive mappings

    International Nuclear Information System (INIS)

    Chidume, C.E.; Ofoedu, E.U.

    2007-07-01

    Let K be a nonempty closed convex subset of a real Banach space E. Let T : K → K be a generalized Lipschitz pseudo-contractive mapping such that F(T) := { x element of K : Tx = x} ≠ 0. Let { α n } n ≥ 1 , { λ n } n ≥ 1 and { θ n } n ≥ 1 be real sequences in (0, 1) such that α n = o( θ n ), lim n →∞ λ n = 0 and λ n ( α n + θ n ) 1 element of K, let the sequence { x n } n ≥ 1 be iteratively generated by x n+1 = (1 - λ n α n )x n + λ n α n Tx n - λ n θ n (x n - x 1 ), n ≥ 1. Then, { x n } n ≥ 1 is bounded. Moreover, if E is a reflexive Banach space with uniformly Gateaux differentiable norm and if Σ n=1 ∞ λ n θ n = ∞ is additionally assumed, then, under mild conditions, left brace# x n } n ≥ 1 converges strongly to some x* element of F(T). (author)

  11. The Fixed-Point Theory of Strictly Contracting Functions on Generalized Ultrametric Semilattices

    Directory of Open Access Journals (Sweden)

    Eleftherios Matsikoudis

    2013-08-01

    Full Text Available We introduce a new class of abstract structures, which we call generalized ultrametric semilattices, and in which the meet operation of the semilattice coexists with a generalized distance function in a tightly coordinated way. We prove a constructive fixed-point theorem for strictly contracting functions on directed-complete generalized ultrametric semilattices, and introduce a corresponding induction principle. We cite examples of application in the semantics of logic programming and timed computation, where, until now, the only tool available has been the non-constructive fixed-point theorem of Priess-Crampe and Ribenboim for strictly contracting functions on spherically complete generalized ultrametric semilattices.

  12. Discussion on safety culture general contract model of consultation enterprises

    International Nuclear Information System (INIS)

    Dong Huimin; Zhang Hao

    2012-01-01

    With a high safety requirement, long construction period, a large amount of investment and many influencing factors of the preparation and implementation of project schedule, local nuclear power always is built through EPC. Safety level depends on EPC. Some measures should be taken for local consultation enterprises to improve situation of safety. Some suggestion as follows: safety culture should be received enough attention; management system should be established in according with requirement of safety culture; try to encourage employee involvement; to assess it in time; safety system should be entirely compatible with enterprises system. (authors)

  13. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  14. Analysis of Government Accountability Office and Department of Defense Inspector General Reports and Commercial Sources on Service Contracts

    Science.gov (United States)

    2010-06-01

    Acquisition Research Program BIM Building Information Modeling COR Contracting Officer Representative DoD Department of Defense FPDS...WBS), performance work statements (PWS) and statement of work (SOW), market research, budget and cost estimates, determining contract type, and...contracting within this project. The recurrent best practices in contracting among all sources emphasized planning, defining requirements, market research

  15. Wess-Zumino term for the AdS superstring and generalized Inoenue-Wigner contraction

    International Nuclear Information System (INIS)

    Hatsuda, Machiko; Sakaguchi, Makoto

    2003-01-01

    We examine a Wess-Zumino term, written in a form of bilinear in superinvariant currents, for a superstring in anti-de Sitter (AdS) space, and derive a procedure for obtaining the correct flat limit. The standard Inoenue-Wigner contraction does not give the correct flat limit but, rather, gives zero. This erroneous result originates from the fact that the fermionic metric of the super-Poincare group is degenerate. We propose a generalization of the Inoenue-Wigner contraction from which a 'nondegenerate' super-Poincare group is derived from the super-AdS group. For this reason, this contraction gives the correct flat limit of this Wess-Zumino term. We also discuss the M-algebra obtained using this generalized Inoenue-Wigner contraction from osp(1|32). (author)

  16. Fixed Point Theorems for Generalized α-β-Weakly Contraction Mappings in Metric Spaces and Applications

    Directory of Open Access Journals (Sweden)

    Abdul Latif

    2014-01-01

    Full Text Available We extend the notion of generalized weakly contraction mappings due to Choudhury et al. (2011 to generalized α-β-weakly contraction mappings. We show with examples that our new class of mappings is a real generalization of several known classes of mappings. We also establish fixed point results for such mappings in metric spaces. Applying our new results, we obtain fixed point results on ordinary metric spaces, metric spaces endowed with an arbitrary binary relation, and metric spaces endowed with graph.

  17. 48 CFR 732.111 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111... CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may... Agency-specific indefinite quantity contracts that are a combination of contract types. Rather than using...

  18. 48 CFR 232.704-70 - Incrementally funded fixed-price contracts.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING...'s decision and terminate for the convenience of the Government. (c) The contracting officer shall...

  19. 13 CFR 126.700 - What are the performance of work requirements for HUBZone contracts?

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the performance of work... ADMINISTRATION HUBZONE PROGRAM Contract Performance Requirements § 126.700 What are the performance of work... meet the performance of work requirements set forth in § 125.6(c) of this chapter. (b) In addition to...

  20. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Science.gov (United States)

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime... the subcontract for any reason, the recipient must require the prime contractor to employ the six good...

  1. 77 FR 36611 - Core Principles and Other Requirements for Designated Contract Markets

    Science.gov (United States)

    2012-06-19

    ... vii. Sec. 38.156--Automated Trade Surveillance System viii. Sec. 38.157--Real-Time Market Monitoring...--Additional Requirements for Physical-Delivery Contracts iii. Sec. 38.253--Additional Requirements for Cash... Commission's oversight program, serving as a key tool for monitoring a DCM's compliance with the core...

  2. 27 CFR 7.28 - General requirements.

    Science.gov (United States)

    2010-04-01

    ... statements of alcoholic content, all mandatory information required on labels by this part shall be in script.... Except for statements of alcoholic content, all mandatory information required on labels by this part... OF THE TREASURY LIQUORS LABELING AND ADVERTISING OF MALT BEVERAGES Labeling Requirements for Malt...

  3. 40 CFR 141.80 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... service line replacement, and public education. These requirements are triggered, in some cases, by lead... requirements. (1) All water systems shall install and operate optimal corrosion control treatment as defined in... specified by the State under § 141.83. (f) Lead service line replacement requirements. Any system exceeding...

  4. Fixed point results for contractions involving generalized altering distances in ordered metric spaces

    Directory of Open Access Journals (Sweden)

    Samet Bessem

    2011-01-01

    Full Text Available Abstract In this article, we establish coincidence point and common fixed point theorems for mappings satisfying a contractive inequality which involves two generalized altering distance functions in ordered complete metric spaces. As application, we study the existence of a common solution to a system of integral equations. 2000 Mathematics subject classification. Primary 47H10, Secondary 54H25

  5. Multidimensional coincidence point results for generalized $(\\psi ,\\theta ,\\varphi$-contraction on ordered metric spaces

    Directory of Open Access Journals (Sweden)

    Bhavana Deshpande

    2017-11-01

    Full Text Available The main objective of this research article is to establish some coincidence point theorem for $g$-non-decreasing mappings under generalized $(\\psi ,\\theta ,\\varphi $-contraction on a partially ordered metric space. Furthermore, we show how multidimensional results can be seen as a simple consequences of our unidimensional coincidence point theorem. Our results modify, improve, sharpen, enrich and generalize various known results.

  6. 27 CFR 4.38 - General requirements.

    Science.gov (United States)

    2010-04-01

    ... mandatory information required on labels by this part, except the alcoholic content statement, shall be in... OF THE TREASURY LIQUORS LABELING AND ADVERTISING OF WINE Labeling Requirements for Wine § 4.38... descriptive or explanatory information, the script, type, or printing of the mandatory information shall be of...

  7. 46 CFR Sec. 2 - General Agent's requirements.

    Science.gov (United States)

    2010-10-01

    ... chest items required for the intended voyage. Purchase for the account of the NSA, from recognized bona... respective domestic ports, only such items and quantities reflecting past experience of actual requirements. (b) Arrange for delivery on board to the custody of the Master all slop chest items purchased...

  8. An Analysis of the Acquisition Process for Simplified Acquisition of Base Engineering Requirements (SABER) Contracts and Its Potential Impact on Contractor Performance

    National Research Council Canada - National Science Library

    Heaps, Brian

    2001-01-01

    The Simplified Acquisition of Base Engineering Requirements (SABER) contract's main purpose is to expedite contract award of civil engineer requirements through the issuance of individual delivery orders...

  9. Nitric oxide is required for the insulin sensitizing effects of contraction in mouse skeletal muscle.

    Science.gov (United States)

    Zhang, Xinmei; Hiam, Danielle; Hong, Yet-Hoi; Zulli, Anthony; Hayes, Alan; Rattigan, Stephen; McConell, Glenn K

    2017-12-15

    People with insulin resistance or type 2 diabetes can substantially increase their skeletal muscle glucose uptake during exercise and insulin sensitivity after exercise. Skeletal muscle nitric oxide (NO) is important for glucose uptake during exercise, although how prior exercise increases insulin sensitivity is unclear. In the present study, we examined whether NO is necessary for normal increases in skeletal muscle insulin sensitivity after contraction ex vivo in mouse muscle. The present study uncovers, for the first time, a novel role for NO in the insulin sensitizing effects of ex vivo contraction, which is independent of blood flow. The factors regulating the increase in skeletal muscle insulin sensitivity after exercise are unclear. We examined whether nitric oxide (NO) is required for the increase in insulin sensitivity after ex vivo contractions. Isolated C57BL/6J mouse EDL muscles were contracted for 10 min or remained at rest (basal) with or without the NO synthase (NOS) inhibition (N G -monomethyl-l-arginine; l-NMMA; 100 μm). Then, 3.5 h post contraction/basal, muscles were exposed to saline or insulin (120 μU ml -1 ) with or without l-NMMA during the last 30 min. l-NMMA had no effect on basal skeletal muscle glucose uptake. The increase in muscle glucose uptake with insulin (57%) was significantly (P contraction (140% increase). NOS inhibition during the contractions had no effect on this insulin-sensitizing effect of contraction, whereas NOS inhibition during insulin prevented the increase in skeletal muscle insulin sensitivity post-contraction. Soluble guanylate cyclase inhibition, protein kinase G (PKG) inhibition or cyclic nucleotide phosphodiesterase inhibition each had no effect on the insulin-sensitizing effect of prior contraction. In conclusion, NO is required for increases in insulin sensitivity several hours after contraction of mouse skeletal muscle via a cGMP/PKG independent pathway. © 2017 The Authors. The Journal of Physiology

  10. 40 CFR 141.500 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... before or at the first customer for filtered systems, or Cryptosporidium control under the watershed control plan for unfiltered systems; and (b) Compliance with the profiling and benchmark requirements in...

  11. 40 CFR 141.170 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... recontamination by surface water runoff and a point downstream before or at the first customer for filtered...) Compliance with the profiling and benchmark requirements under the provisions of § 141.172. (b) A public...

  12. 7 CFR 322.5 - General requirements.

    Science.gov (United States)

    2010-01-01

    ... honeybees. (1) You may import live adult bees or live brood and essential nest substrate under this subpart..., DEPARTMENT OF AGRICULTURE BEES, BEEKEEPING BYPRODUCTS, AND BEEKEEPING EQUIPMENT Importation of Adult Honeybees, Honeybee Germ Plasm, and Bees Other Than Honeybees From Approved Regions § 322.5 General...

  13. A new iteration process for finite families of generalized lipschitz pseudo-contractive and generalized lipschitz accretive mappings

    International Nuclear Information System (INIS)

    Chidume, C.E.; Ofoedu, E.U.

    2007-07-01

    In this paper, we introduce a new iteration process and prove that it converges strongly to a common fixed point for a finite family of generalized Lipschitz nonlinear mappings in a real reflexive Banach space E with a with uniformly Gateaux differentiable norm if at least one member of the family is pseudo-contractive. We also prove that a slight modification of the process converges to a common zero for a finite family of generalized Lipschitz accretive operators defined on E. Results for nonexpansive families are obtained as easy corollaries. Finally, our new iteration process and our method of proof are of independent interest. (author)

  14. 26 CFR 1.817-5 - Diversification requirements for variable annuity, endowment, and life insurance contracts.

    Science.gov (United States)

    2010-04-01

    ... issuer or holder of the variable contract must agree to make such adjustments or pay such amounts as may... quarter because of a discrepancy between the value of its assets and the diversification requirements unless such discrepancy exists immediately after the acquisition of any asset and such discrepancy is...

  15. 29 CFR 780.604 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... follows: (a) Employment of the employee “primarily” in agriculture in the particular workweek. (b) This primary employment by a farmer. (c) Engagement by the farmer in raising livestock. (d) Engagement by the... employee. These requirements will be separately discussed in the following sections of this subpart. ...

  16. 21 CFR 640.25 - General requirements.

    Science.gov (United States)

    2010-04-01

    ... quality control testing under paragraph (b) of this section may be performed by a clinical laboratory...) Quality control testing. Each month four units prepared from different donors shall be tested at the end... quality control testing indicate that the product does not meet the prescribed requirements, immediate...

  17. 29 CFR 1926.403 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... ready and safe operation and maintenance of such equipment. (i) Working clearances. Except as required... sufficient durability to withstand the environment involved. (h) Identification of disconnecting means and... sufficient durability to withstand the environment involved. (i) 600 Volts, nominal, or less. This paragraph...

  18. 10 CFR 63.131 - General requirements.

    Science.gov (United States)

    2010-01-01

    ... are within the limits assumed in the licensing review; and (2) Natural and engineered systems and components required for repository operation, and that are designed or assumed to operate as barriers after... information on those parameters and natural processes pertaining to the geologic setting that may be changed...

  19. 10 CFR 60.140 - General requirements.

    Science.gov (United States)

    2010-01-01

    ... assumed in the licensing review; and (2) Natural and engineered systems and components required for repository operation, or which are designed or assumed to operate as barriers after permanent closure, are... of the natural and engineered elements of the geologic repository to meet the performance objectives...

  20. 49 CFR 178.801 - General requirements.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS REGULATIONS SPECIFICATIONS FOR PACKAGINGS... transportation and are considered minimum requirements. Each packaging must be manufactured and assembled so as... design type refers to an IBC that does not differ in structural design, size, material of construction...

  1. 32 CFR 807.1 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... Libraries for public use according to AFR 4-61. They will also advise requesters that these libraries are... disclosure policy office and to HQ USAF/CVAII, Washington DC 20330-5000. Also send information copies of such requests to the base public affairs office. Commands will supplement this requirement to include policies...

  2. 46 CFR 111.95-3 - General requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false General requirements. 111.95-3 Section 111.95-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-3 General requirements. (a) Each electrical...

  3. Common Fixed Point of Multivalued Generalized φ-Weak Contractive Mappings

    Directory of Open Access Journals (Sweden)

    Behzad Djafari Rouhani

    2010-01-01

    Full Text Available Fixed point and coincidence results are presented for multivalued generalized φ-weak contractive mappings on complete metric spaces, where φ:[0,+∞→[0,+∞ is a lower semicontinuous function with φ(0=0 and φ(t>0 for all t>0. Our results extend previous results by Zhang and Song (2009, as well as by Rhoades (2001, Nadler (1969, and Daffer and Kaneko (1995.

  4. The Generalized Hill Model: A Kinematic Approach Towards Active Muscle Contraction

    Science.gov (United States)

    Menzel, Andreas; Kuhl, Ellen

    2014-01-01

    Excitation-contraction coupling is the physiological process of converting an electrical stimulus into a mechanical response. In muscle, the electrical stimulus is an action potential and the mechanical response is active contraction. The classical Hill model characterizes muscle contraction though one contractile element, activated by electrical excitation, and two non-linear springs, one in series and one in parallel. This rheology translates into an additive decomposition of the total stress into a passive and an active part. Here we supplement this additive decomposition of the stress by a multiplicative decomposition of the deformation gradient into a passive and an active part. We generalize the one-dimensional Hill model to the three-dimensional setting and constitutively define the passive stress as a function of the total deformation gradient and the active stress as a function of both the total deformation gradient and its active part. We show that this novel approach combines the features of both the classical stress-based Hill model and the recent active-strain models. While the notion of active stress is rather phenomenological in nature, active strain is micro-structurally motivated, physically measurable, and straightforward to calibrate. We demonstrate that our model is capable of simulating excitation-contraction coupling in cardiac muscle with its characteristic features of wall thickening, apical lift, and ventricular torsion. PMID:25221354

  5. Device description and general physics requirements

    International Nuclear Information System (INIS)

    Neilson, G.H. Jr.

    1992-01-01

    To accomplish the dual goals set forth in the mission statement - determination of burning plasma physics and demonstration of fusion power production - requires a tokamak with special characteristics. A conceptual design for such a facility has been developed by the CIT/BPX Project team over a period of about 5 years. The process has drawn extensively upon the world tokamak physics data base as well as engineering experience gained on actual machines like Tokamak Fusion Test Reactor (TFTR) and the Alcators and on design studies for machines like the Long-Pulse Ignited Test experiment (LITE) and the Tokamak Fusion Core Experiment (TFCX). The Joint European Torus (JET) and Doublet III-D (DIII-D) experiments in particular have had a significant influence on the physics base. The resulting design incorporates features that have proven successful in tokamak experiments, combined with new features that are needed in the regime of high-power-density deuterium-tritium (D-T) fusion plasmas

  6. THE REQUIRED FORM OF A PRE-CONTRACT ALLOWING FOR A COURT JUDGMENT TO STAND FOR A SALE CONTRACT

    Directory of Open Access Journals (Sweden)

    Delia Narcisa THEOHARI

    2017-05-01

    Full Text Available A bilateral promissory agreement for sale needs no notarial deed to constitute, in case of non-fulfillment, grounds for the delivery of a judgment which takes the place of a sale contract, a private agreement being sufficient whereas the judgment itself represents the sale contract and both the substantive and formal conditions are therefore satisfied.

  7. 34 CFR 674.41 - Due diligence-general requirements.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Due diligence-general requirements. 674.41 Section 674... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FEDERAL PERKINS LOAN PROGRAM Due Diligence § 674.41 Due diligence—general requirements. (a) General. Each institution shall exercise due diligence in collecting...

  8. 47 CFR 61.41 - Price cap requirements generally.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Price cap requirements generally. 61.41 Section... (CONTINUED) TARIFFS General Rules for Dominant Carriers § 61.41 Price cap requirements generally. (a... companies shall not bar a carrier from electing price cap regulation provided the carrier is otherwise...

  9. 30 CFR 817.81 - Coal mine waste: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal mine waste: General requirements. 817.81... ACTIVITIES § 817.81 Coal mine waste: General requirements. (a) General. All coal mine waste disposed of in an... within a permit area, which are approved by the regulatory authority for this purpose. Coal mine waste...

  10. 30 CFR 816.81 - Coal mine waste: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal mine waste: General requirements. 816.81... ACTIVITIES § 816.81 Coal mine waste: General requirements. (a) General. All coal mine waste disposed of in an... within a permit area, which are approved by the regulatory authority for this purpose. Coal mine waste...

  11. The removal of the consideration requirement, and the consequent clarification on duress, for verbal modifications to Irish construction contracts

    OpenAIRE

    Mooney, Conor Francis Joseph

    2015-01-01

    peer-reviewed This thesis studies the consideration requirement for verbally-made contract variations in Irish construction contracts, and proposes how this specific circumstance can be best served by the law of contract. Construction is a complex and uncertain industry; and an effective construction industry is important and necessary for Ireland: it is a key driver of a functioning, developed economy, and it requires a sustainable level of activity to maintain infrastructu...

  12. 49 CFR 659.21 - System security plan: general requirements.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: general requirements. 659.21... State Oversight Agency § 659.21 System security plan: general requirements. (a) The oversight agency shall require the rail transit agency to implement a system security plan that, at a minimum, complies...

  13. 29 CFR 4.110 - What contracts are covered.

    Science.gov (United States)

    2010-07-01

    ...'Hara Service Contract Act Covered Contracts Generally § 4.110 What contracts are covered. The Act... mean that the contract is not within the coverage of the Act. The amount of the contract is not determinative of the Act's coverage, although the requirements are different for contracts in excess of $2,500...

  14. 20 CFR 670.320 - What are the requirements for award of contracts and payments to Federal agencies?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What are the requirements for award of contracts and payments to Federal agencies? 670.320 Section 670.320 Employees' Benefits EMPLOYMENT AND... Funding and Selection of Service Providers § 670.320 What are the requirements for award of contracts and...

  15. 47 CFR 18.109 - General technical requirements.

    Science.gov (United States)

    2010-10-01

    ... MEDICAL EQUIPMENT General Information § 18.109 General technical requirements. ISM equipment shall be... filtering to provide adequate suppression of emissions on frequencies outside the frequency bands specified...

  16. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    Science.gov (United States)

    Paxton, Joseph; Tucker, Brian

    2010-01-01

    This paper will present a model that uses the Supply-Chain Operations Reference (SCOR) model as a foundation for a framework to illustrate the information needed throughout a product lifecycle to support a healthy supply chain management function and the subsequent contract requirements to enable it. It will also show where in the supply chain the information must be extracted. The ongoing case study used to exemplify the model is NASA's (National Aeronautics and Space Administration) Ares I program for human spaceflight. Effective supply chain management and contract requirements are ongoing opportunities for continuous improvement within government agencies, specifically development of systems for human spaceflight operations. Multiple reports from the Government Accountability Office (GAO) reinforce this importance. The SCOR model is a framework for describing a supply chain with process building blocks and business activities. It provides a set of metrics for measuring supply chain performance and best practices for continuously improving. This paper expands the application of the SCOR to also provide the framework for defining information needed from different levels of the supply chain and at different phases of the lifecycle. These needs can be incorporated into contracts to enable more effective supply chain management. Depending on the phase of the lifecycle, effective supply chain management will require involvement from different levels of the organization and different levels of the supply chain.

  17. Fibroblast Cluster Formation on 3D Collagen Matrices Requires Cell Contraction-Dependent Fibronectin Matrix Organization

    Science.gov (United States)

    da Rocha-Azevedo, Bruno; Ho, Chin-Han; Grinnell, Frederick

    2012-01-01

    Fibroblasts incubated on 3D collagen matrices in serum or lysophosphatidic acid (LPA)-containing medium self-organize into clusters through a mechanism that requires cell contraction. However, in platelet-derived growth factor (PDGF)-containing medium, cells migrate as individuals and do not form clusters even though they constantly encounter each other. Here, we present evidence that a required function of cell contraction in clustering is formation of fibronectin fibrillar matrix. We found that in serum or LPA but not in PDGF or basal medium, cells organized FN (both serum and cellular) into a fibrillar, detergent-insoluble matrix. Cell clusters developed concomitant with FN matrix formation. FN fibrils accumulated beneath cells and along the borders of cell clusters in regions of cell-matrix tension. Blocking Rho kinase or myosin II activity prevented FN matrix assembly and cell clustering. Using siRNA silencing and function-blocking antibodies and peptides, we found that cell clustering and FN matrix assembly required α5β1 integrins and fibronectin. Cells were still able to exert contractile force and compact the collagen matrix under the latter conditions, which showed that contraction was not sufficient for cell clustering to occur. Our findings provide new insights into how procontractile (serum/LPA) and promigratory (PDGF) growth factor environments can differentially regulate FN matrix assembly by fibroblasts interacting with collagen matrices and thereby influence mesenchymal cell morphogenetic behavior under physiologic circumstances such as wound repair, morphogenesis and malignancy. PMID:23117111

  18. Fibroblast cluster formation on 3D collagen matrices requires cell contraction dependent fibronectin matrix organization.

    Science.gov (United States)

    da Rocha-Azevedo, Bruno; Ho, Chin-Han; Grinnell, Frederick

    2013-02-15

    Fibroblasts incubated on 3D collagen matrices in serum or lysophosphatidic acid (LPA)-containing medium self-organize into clusters through a mechanism that requires cell contraction. However, in platelet-derived growth factor (PDGF)-containing medium, cells migrate as individuals and do not form clusters even though they constantly encounter each other. Here, we present evidence that a required function of cell contraction in clustering is formation of fibronectin (FN) fibrillar matrix. We found that in serum or LPA but not in PDGF or basal medium, cells organized FN (both serum and cellular) into a fibrillar, detergent-insoluble matrix. Cell clusters developed concomitant with FN matrix formation. FN fibrils accumulated beneath cells and along the borders of cell clusters in regions of cell-matrix tension. Blocking Rho kinase or myosin II activity prevented FN matrix assembly and cell clustering. Using siRNA silencing and function-blocking antibodies and peptides, we found that cell clustering and FN matrix assembly required α5β1 integrins and fibronectin. Cells were still able to exert contractile force and compact the collagen matrix under the latter conditions, which showed that contraction was not sufficient for cell clustering to occur. Our findings provide new insights into how procontractile (serum/LPA) and promigratory (PDGF) growth factor environments can differentially regulate FN matrix assembly by fibroblasts interacting with collagen matrices and thereby influence mesenchymal cell morphogenetic behavior under physiologic circumstances such as wound repair, morphogenesis and malignancy. Copyright © 2012 Elsevier Inc. All rights reserved.

  19. 48 CFR 1631.205-74 - FEHBP losses on other contracts.

    Science.gov (United States)

    2010-10-01

    ... carry forward” principle that is fundamental to continuing insurance contracts that are based on... MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 1631.205-74 FEHBP losses on...

  20. 48 CFR 32.005 - Consideration for contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.005 Section 32.005 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING 32.005 Consideration for contract financing. (a) Requirement. When a contract financing clause is included at the inception of a contract, there shall be no...

  1. 7 CFR 322.28 - General requirements; restricted articles.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false General requirements; restricted articles. 322.28... EQUIPMENT Importation and Transit of Restricted Articles § 322.28 General requirements; restricted articles. (a) The following articles from any region are restricted articles: (1) Dead bees of any genus; (2...

  2. 49 CFR 173.60 - General packaging requirements for explosives.

    Science.gov (United States)

    2010-10-01

    ... explosives contained in the package, so that neither interaction between the explosives and the packaging... 49 Transportation 2 2010-10-01 2010-10-01 false General packaging requirements for explosives. 173...-GENERAL REQUIREMENTS FOR SHIPMENTS AND PACKAGINGS Definitions, Classification and Packaging for Class 1...

  3. 31 CFR 50.10 - General disclosure requirements.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false General disclosure requirements. 50.10 Section 50.10 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM Disclosures as Conditions for Federal Payment § 50.10 General disclosure requirements. (a...

  4. 7 CFR 205.400 - General requirements for certification.

    Science.gov (United States)

    2010-01-01

    ...) ORGANIC FOODS PRODUCTION ACT PROVISIONS NATIONAL ORGANIC PROGRAM Certification § 205.400 General requirements for certification. A person seeking to receive or maintain organic certification under the... 7 Agriculture 3 2010-01-01 2010-01-01 false General requirements for certification. 205.400...

  5. 46 CFR 111.20-1 - General requirements.

    Science.gov (United States)

    2010-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-1 General requirements. Each transformer winding must be resistant to moisture, sea atmosphere, and oil vapor, unless special precautions...

  6. Directives and general design requirements for a small PWR

    International Nuclear Information System (INIS)

    Arrieta, L.A.

    1992-08-01

    A proposal of directives and general requirements for the development of a small PWR conceptual design is presented. These directives address the main safety, performance and economic design aspects. The purpose is to use this work as a base for a wide discussion, involving all project participants, culminating with the definition of the final directives and general requirements. (author)

  7. 30 CFR 784.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 784.11... PLAN § 784.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  8. 30 CFR 780.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 780.11... PLAN § 780.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  9. Whither British general practice after the 2004 GMS contract? Stories and realities of change in four UK general practices.

    Science.gov (United States)

    Huby, Guro; Guthrie, Bruce; Grant, Suzanne; Watkins, Francis; Checkland, Kath; McDonald, Ruth; Davies, Huw

    2008-01-01

    The purpose of this article is to provide answers to two questions: what has been the impact of nGMS on practice organisation and teamwork; and how do general practice staff perceive the impact? The article is based on comparative in-depth case studies of four UK practices. There was a discrepancy between changes observed and the way practice staff described the impact of the contract. Similar patterns of organisational change were apparent in all practices. Decision-making became concentrated in fewer hands. Formally or informally constituted "elite" multidisciplinary groups monitored and controlled colleagues' behaviour for maximum performance and remuneration. This convergence of organisational form was not reflected in the dominant "story" each practice constructed about its unique ethos and style. The "stories" also failed to detect negative consequences to the practice flowing from its adaptation to the contract. The paper highlights how collective "sensemaking" in practices may fail to detect and address key organisational consequences from the nGMS.

  10. 78 FR 68829 - Information Collection Requirement; Defense Federal Acquisition Regulation Supplement; Contract...

    Science.gov (United States)

    2013-11-15

    ... DFARS 252.232-7007, Limitation of Government's Obligation. DFARS subpart 232.7, Contract [[Page 68830...; Defense Federal Acquisition Regulation Supplement; Contract Financing AGENCY: Defense Acquisition... and OMB Number: Defense Federal Acquisition Regulation Supplement (DFARS) Part 232, Contract Financing...

  11. Generalized Meir-Keeler Type ψ-Contractive Mappings and Applications to Common Solution of Integral Equations

    Directory of Open Access Journals (Sweden)

    Huseyin Isik

    2017-03-01

    Full Text Available The goal of the present article to introduce the notion of generalized Meir-Keeler type ψ-contractions and prove some coupled common fixed point results for such type of contractions. The theorems proved herein extend, generalize and improve some results of the existing literature. Several examples and an application to integral equations are also given in order to illustrate the genuineness of our results.

  12. 75 FR 29547 - Federal Acquisition Regulation; Information Collection; Contract Financing

    Science.gov (United States)

    2010-05-26

    ...; Information Collection; Contract Financing AGENCIES: Department of Defense (DoD), General Services... previously approved information collection requirement concerning contract financing. Public comments are... substantially changed the statutory authorities for Government financing of contracts. Sections 2001(f) and 2051...

  13. 47 CFR 15.407 - General technical requirements.

    Science.gov (United States)

    2010-10-01

    ... National Information Infrastructure Devices § 15.407 General technical requirements. (a) Power limits: (1... information or the use of repetitive codes used by certain digital technologies to complete frame or burst...

  14. 16 CFR 1611.3 - Flammability-general requirement.

    Science.gov (United States)

    2010-01-01

    ... STANDARD FOR THE FLAMMABILITY OF VINYL PLASTIC FILM The Standard § 1611.3 Flammability—general requirement. The rate of burning shall not exceed 1.2 in./sec as judged by the average of five determinations...

  15. 48 CFR 39.107 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer...

  16. 48 CFR 53.111 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contract clause. 53.111... AND FORMS FORMS General 53.111 Contract clause. Contracting officers shall insert the clause at 52.253-1, Computer Generated Forms, in solicitations and contracts that require the contractor to submit...

  17. 48 CFR 833.215 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 833.215 Section 833.215 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 833.215 Contract clause. The contracting...

  18. 48 CFR 432.412 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clause. 432.412 Section 432.412 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for Non-Commercial Items 432.412 Contract clause. The decision...

  19. General Principles and Convention on Contracts for the International Sale of Goods (CISG – Uniformity under an Interpretation Umbrella?

    Directory of Open Access Journals (Sweden)

    Laura Lassila

    2017-01-01

    Full Text Available Globalization and digitalization of international sales creates needs to harmonize rules of international commercial contracts. The question is whether the harmonization should be done by binding rules or using soft law tools or through digitalization. In this article I argue on favor of harmonization through international contracts law rules’ international interpretation.The international interpretation principles used in this article are found from on Art. 7(1 of the Convention on Contracts for the International Sale of Goods (CISG which sets three interpretation rules: international character; promoting uniformity; and observance of good faith in international trade. These principles are not only principles of the CISG, but also principles commonly recognized in international commercial practice and also in domestic contract rules. I argue that by adopting an international interpretation umbrella – the meta-principle of international interpretation, cross-border contracts could be interpreted under the same principle no matter applicable substantial law. The meta-principle functions as an interpretation umbrella covering general principles and Articles of the CISG, general principles of international commercial contracts, Lex Mercatoria, and cross-border contract provision under national law.The outcomes points out that arbitral tribunals have interpreted general principles of the CISG and Lex Mercatoria in various ways. General principles and their application in case law is analyzed in connection with the Civil Code of the Russian Federation. Tribunals found that general principles of the CISG are applicable even if the CISG is not. It follows Art.’s 7(2 logic to promote international standard to cross-border contracts where the closes connection is international commercial practice rather than any national jurisdiction.

  20. 1 CFR 21.21 - General requirements: References.

    Science.gov (United States)

    2010-01-01

    ... 1 General Provisions 1 2010-01-01 2010-01-01 false General requirements: References. 21.21 Section... to test methods or consensus standards produced by a Federal agency that have replaced or preempted private or voluntary test methods or consensus standards in a subject matter area. (5) The reference is to...

  1. 22 CFR 62.8 - General program requirements.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false General program requirements. 62.8 Section 62.8 Foreign Relations DEPARTMENT OF STATE PUBLIC DIPLOMACY AND EXCHANGES EXCHANGE VISITOR PROGRAM General... purpose of sharing the language, culture, or history of their home country with Americans, provided such...

  2. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Science.gov (United States)

    2012-02-09

    ... POSTAL SERVICE 39 CFR Part 230 Office of Inspector General; Contractor Requirements AGENCY: Postal... for contractors employed by the Office of Inspector General. The rule also emphasizes consistency in contractor selection, and clarifies the OIG's exclusive authority to set qualifications and standards for its...

  3. 31 CFR 128.1 - General reporting requirements.

    Science.gov (United States)

    2010-07-01

    ...) Data pertaining to direct investment transactions are not required to be reported under this Part. (3... INTERNATIONAL CAPITAL AND FOREIGN-CURRENCY TRANSACTIONS AND POSITIONS General Information § 128.1 General... International Investment and Trade in Services Survey Act, as amended (22 U.S.C. 3101 et seq.); and E.O. 11961...

  4. 40 CFR 205.55-1 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false General requirements. 205.55-1 Section 205.55-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.55-1 General...

  5. A general diagrammatic algorithm for contraction and subsequent simplification of second-quantized expressions.

    Science.gov (United States)

    Bochevarov, Arteum D; Sherrill, C David

    2004-08-22

    We present a general computer algorithm to contract an arbitrary number of second-quantized expressions and simplify the obtained analytical result. The functions that perform these operations are a part of the program Nostromo which facilitates the handling and analysis of the complicated mathematical formulas which are often encountered in modern quantum-chemical models. In contrast to existing codes of this kind, Nostromo is based solely on the Goldstone-diagrammatic representation of algebraic expressions in Fock space and has capabilities to work with operators as well as scalars. Each Goldstone diagram is internally represented by a line of text which is easy to interpret and transform. The calculation of matrix elements does not exploit Wick's theorem in a direct way, but uses diagrammatic techniques to produce only nonzero terms. The identification of equivalent expressions and their subsequent factorization in the final result is performed easily by analyzing the topological structure of the diagrammatic expressions. (c) 2004 American Institute of Physics

  6. 30 CFR 71.201 - Sampling; general requirements.

    Science.gov (United States)

    2010-07-01

    ... MINES Sampling Procedures § 71.201 Sampling; general requirements. (a) Each operator shall take... required by this part with a sampling device approved by the Secretary and the Secretary of Health and Human Services under part 74 (Coal Mine Dust Personal Sampler Units) of this title. (b) Sampling devices...

  7. 30 CFR 70.201 - Sampling; general requirements.

    Science.gov (United States)

    2010-07-01

    ...; general requirements. (a) Each operator shall take respirable dust samples of the concentration of respirable dust in the active workings of the mine as required by this part with a sampling device approved... Personal Sampler Units) of this title. (b) Sampling devices shall be worn or carried directly to and from...

  8. General-purpose heat source development. Phase I: design requirements

    International Nuclear Information System (INIS)

    Snow, E.C.; Zocher, R.W.

    1978-09-01

    Studies have been performed to determine the necessary design requirements for a 238 PuO 2 General-Purpose Heat Source (GPHS). Systems and missions applications, as well as accident conditions, were considered. The results of these studies, along with the recommended GPHS design requirements, are given in this report

  9. 14 CFR 125.91 - Airplane requirements: General.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane requirements: General. 125.91... AND OPERATIONS: AIRPLANES HAVING A SEATING CAPACITY OF 20 OR MORE PASSENGERS OR A MAXIMUM PAYLOAD CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Airplane Requirements...

  10. 9 CFR 91.3 - General export requirements.

    Science.gov (United States)

    2010-01-01

    ... finds such tests are not necessary to prevent the exportation of diseased animals from the United States. (c) Testing. All samples for tests required by §§ 91.5 through 91.13 for exportation of animals under... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false General export requirements. 91.3...

  11. 48 CFR 432.113 - Customary contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 432.113 Section 432.113 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.113 Customary contract financing. The contracting officer may determine the necessity for customary contract financing. The...

  12. 48 CFR 32.007 - Contract financing payments.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract financing... GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING 32.007 Contract financing payments. (a)(1) Unless... section, the due date for making contract financing payments by the designated payment office is the 30th...

  13. Analysis of General Accounting Office, Armed Services Board of Contract Appeals and Federal Court of Claims Decisions on Protests Disputes Involving Performance Specifications

    National Research Council Canada - National Science Library

    Murphy-Sweet, Philip

    2002-01-01

    ... involving Performance Specifications. Performance Specifications generally leave the contractor open to decide the best means to accomplish the work of a contract and deliver the product called for in the contract...

  14. A General Mathematical Algorithm for Predicting the Course of Unfused Tetanic Contractions of Motor Units in Rat Muscle.

    Directory of Open Access Journals (Sweden)

    Rositsa Raikova

    Full Text Available An unfused tetanus of a motor unit (MU evoked by a train of pulses at variable interpulse intervals is the sum of non-equal twitch-like responses to these stimuli. A tool for a precise prediction of these successive contractions for MUs of different physiological types with different contractile properties is crucial for modeling the whole muscle behavior during various types of activity. The aim of this paper is to develop such a general mathematical algorithm for the MUs of the medial gastrocnemius muscle of rats. For this purpose, tetanic curves recorded for 30 MUs (10 slow, 10 fast fatigue-resistant and 10 fast fatigable were mathematically decomposed into twitch-like contractions. Each contraction was modeled by the previously proposed 6-parameter analytical function, and the analysis of these six parameters allowed us to develop a prediction algorithm based on the following input data: parameters of the initial twitch, the maximum force of a MU and the series of pulses. Linear relationship was found between the normalized amplitudes of the successive contractions and the remainder between the actual force levels at which the contraction started and the maximum tetanic force. The normalization was made according to the amplitude of the first decomposed twitch. However, the respective approximation lines had different specific angles with respect to the ordinate. These angles had different and non-overlapping ranges for slow and fast MUs. A sensitivity analysis concerning this slope was performed and the dependence between the angles and the maximal fused tetanic force normalized to the amplitude of the first contraction was approximated by a power function. The normalized MU contraction and half-relaxation times were approximated by linear functions depending on the normalized actual force levels at which each contraction starts. The normalization was made according to the contraction time of the first contraction. The actual force levels

  15. 36 CFR 51.78 - Will a concession contract require a franchise fee and will the franchise fee be subject to...

    Science.gov (United States)

    2010-07-01

    ... require a franchise fee and will the franchise fee be subject to adjustment? 51.78 Section 51.78 Parks... Concession Contract Provisions § 51.78 Will a concession contract require a franchise fee and will the franchise fee be subject to adjustment? (a) Concession contracts will provide for payment to the government...

  16. 42 CFR 423.401 - General requirements for PDP sponsors.

    Science.gov (United States)

    2010-10-01

    ... sponsor is organized and licensed under State law as a risk bearing entity eligible to offer health insurance or health benefits coverage in each State in which it offers a prescription drug plan. If not... with State Law and Preemption by Federal Law § 423.401 General requirements for PDP sponsors. (a...

  17. 40 CFR 141.400 - General requirements and applicability.

    Science.gov (United States)

    2010-07-01

    ... system with fecally contaminated source water or with significant deficiencies subject to the treatment... 40 Protection of Environment 22 2010-07-01 2010-07-01 false General requirements and applicability. 141.400 Section 141.400 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER...

  18. 31 CFR 50.30 - General participation requirements.

    Science.gov (United States)

    2010-07-01

    .... 50.30 Section 50.30 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM State Residual Market Insurance Entities; Workers' Compensation Funds § 50.30 General participation requirements. (a) Insurers. As defined in § 50.5(f), all State residual market...

  19. 21 CFR 1301.71 - Security requirements generally.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Security requirements generally. 1301.71 Section 1301.71 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE REGISTRATION OF..., cooperative buying, etc.); (2) The type and form of controlled substances handled (e.g., bulk liquids or...

  20. 31 CFR 208.6 - General account requirements.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false General account requirements. 208.6 Section 208.6 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE MANAGEMENT OF FEDERAL AGENCY...

  1. 48 CFR 32.103 - Progress payments under construction contracts.

    Science.gov (United States)

    2010-10-01

    ... REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.103... to be withheld shall be made by the contracting officer on a case-by-case basis. Such decisions will... other factors. Upon completion of all contract requirements, retained amounts shall be paid promptly...

  2. Recommended general safety requirements for nuclear power plants

    International Nuclear Information System (INIS)

    1983-06-01

    This report presents recommendations for a set of general safety requirements that could form the basis for the licensing of nuclear power plants by the Atomic Energy Control Board. In addition to a number of recommended deterministic requirements the report includes criteria for the acceptability of the design of such plants based upon the calculated probability and consequence (in terms of predicted radiation dose to members of the public) of potential fault sequences. The report also contains a historical review of nuclear safety principles and practices in Canada

  3. Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

    International Nuclear Information System (INIS)

    Sanford, P.C.; Moe, M.A.; Hombach, W.G.; Urdangaray, R.

    2013-01-01

    The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

  4. 40 CFR Appendix C-2 to Subpart E... - Required Provisions-Construction Contracts

    Science.gov (United States)

    2010-07-01

    ... of another contractor in the performance of a contract with the owner, fires, floods, epidemics... agents or representatives offered or gave gratuities (in the form of entertainment, gifts, or otherwise...

  5. The ATP required for potentiation of skeletal muscle contraction is released via pannexin hemichannels.

    Science.gov (United States)

    Riquelme, Manuel A; Cea, Luis A; Vega, José L; Boric, Mauricio P; Monyer, Hannah; Bennett, Michael V L; Frank, Marina; Willecke, Klaus; Sáez, Juan C

    2013-12-01

    During repetitive stimulation of skeletal muscle, extracellular ATP levels raise, activating purinergic receptors, increasing Ca2+ influx, and enhancing contractile force, a response called potentiation. We found that ATP appears to be released through pannexin1 hemichannels (Panx1 HCs). Immunocytochemical analyses and function were consistent with pannexin1 localization to T-tubules intercalated with dihydropyridine and ryanodine receptors in slow (soleus) and fast (extensor digitorum longus, EDL) muscles. Isolated myofibers took up ethidium (Etd+) and released small molecules (as ATP) during electrical stimulation. Consistent with two glucose uptake pathways, induced uptake of 2-NBDG, a fluorescent glucose derivative, was decreased by inhibition of HCs or glucose transporter (GLUT4), and blocked by dual blockade. Adult skeletal muscles apparently do not express connexins, making it unlikely that connexin hemichannels contribute to the uptake and release of small molecules. ATP release, Etd+ uptake, and potentiation induced by repetitive electrical stimulation were blocked by HC blockers and did not occur in muscles of pannexin1 knockout mice. MRS2179, a P2Y1R blocker, prevented potentiation in EDL, but not soleus muscles, suggesting that in fast muscles ATP activates P2Y1 but not P2X receptors. Phosphorylation on Ser and Thr residues of pannexin1 was increased during potentiation, possibly mediating HC opening. Opening of Panx1 HCs during repetitive activation allows efflux of ATP, influx of glucose and possibly Ca2+ too, which are required for potentiation of contraction. This article is part of the Special Issue Section entitled 'Current Pharmacology of Gap Junction Channels and Hemichannels'. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

    Energy Technology Data Exchange (ETDEWEB)

    Sanford, P.C. [Consultant, 11221 E. Cimmarron Dr., Englewood, CO 80111 (United States); Moe, M.A. [EMCBC Office of Cost Estimating and Analysis, United States Department of Energy, 250 E. 5th Street, Suite 500, Cincinnati, OH 45202 (United States); Hombach, W.G. [Team Analysis, Inc., 2 Cardinal Park Drive, Suite 105A, Leesburg, VA 20175 (United States); Urdangaray, R. [Project Performance Corporation, 1760 Old Meadow Road, McLean, VA 22102 (United States)

    2013-07-01

    The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

  7. GENERAL CONSIDERATIONS ON REGULATIONS AND SAFETY REQUIREMENTS FOR QUADRICYCLES

    Directory of Open Access Journals (Sweden)

    Ana Pavlovic

    2015-12-01

    Full Text Available In recent years, a new class of compact vehicles has been emerging and wide-spreading all around Europe: the quadricycle. These four-wheeled motor vehicles, originally derived from motorcycles, are a small and fuel-efficient mean of transportation used in rural or urban areas as an alternative to motorbikes or city cars. In some countries, they are also endorsed by local authorities and institutions which support small and environmentally-friendly vehicles. In this paper, several general considerations on quadricycles will be provided including the vehicle classification, evolution of regulations (as homologation, driver licence, emissions, etc, technical characteristics, safety requirements, most relevant investigations, and other additional useful information (e.g. references, links. It represents an important and actual topic of investigation for designers and manufacturers considering that the new EU regulation on the approval and market surveillance of quadricycles will soon enter in force providing conclusive requirements for functional safety environmental protection of these promising vehicles.

  8. Context generalization in Drosophila visual learning requires the mushroom bodies

    Science.gov (United States)

    Liu, Li; Wolf, Reinhard; Ernst, Roman; Heisenberg, Martin

    1999-08-01

    The world is permanently changing. Laboratory experiments on learning and memory normally minimize this feature of reality, keeping all conditions except the conditioned and unconditioned stimuli as constant as possible. In the real world, however, animals need to extract from the universe of sensory signals the actual predictors of salient events by separating them from non-predictive stimuli (context). In principle, this can be achieved ifonly those sensory inputs that resemble the reinforcer in theirtemporal structure are taken as predictors. Here we study visual learning in the fly Drosophila melanogaster, using a flight simulator,, and show that memory retrieval is, indeed, partially context-independent. Moreover, we show that the mushroom bodies, which are required for olfactory but not visual or tactile learning, effectively support context generalization. In visual learning in Drosophila, it appears that a facilitating effect of context cues for memory retrieval is the default state, whereas making recall context-independent requires additional processing.

  9. Thermophoretic diffusion and nonlinear radiative heat transfer due to a contracting cylinder in a nanofluid with generalized slip condition

    Directory of Open Access Journals (Sweden)

    Z. Abbas

    Full Text Available An analysis is carried out to study the generalized slip condition and MHD flow of a nanofluid due to a contracting cylinder in the presence of non-linear radiative heat transfer using Buongiorno’s model. The Navier-Stokes along with energy and nanoparticle concentration equations is transformed to highly nonlinear ordinary differential equations using similarity transformations. These similar differential equations are then solved numerically by employing a shooting technique with Runge–Kutta–Fehlberg method. Dual solutions exist for a particular range of the unsteadiness parameter. The physical influence of the several important fluid parameters on the flow velocity, temperature and nanoparticle volume fraction is discussed and shown through graphs and table in detail. The present study indicates that as increase of Brownian motion parameter and slip velocity is to decrease the nanoparticle volume fraction. Keywords: Nanofluid, Contracting cylinder, Nonlinear thermal radiation, Generalized slip condition, Numerical solution

  10. Why is cytoskeletal contraction required for cardiac fusion before but not after looping begins?

    Science.gov (United States)

    Shi, Yunfei; Varner, Victor D.; Taber, Larry A.

    2015-02-01

    Cytoskeletal contraction is crucial to numerous morphogenetic processes, but its role in early heart development is poorly understood. Studies in chick embryos have shown that inhibiting myosin-II-based contraction prior to Hamburger-Hamilton (HH) stage 10 (33 h incubation) impedes fusion of the mesodermal heart fields that create the primitive heart tube (HT), as well as the ensuing process of cardiac looping. If contraction is inhibited at or after looping begins at HH10, however, fusion and looping proceed relatively normally. To explore the mechanisms behind this seemingly fundamental change in behavior, we measured spatiotemporal distributions of tissue stiffness, stress, and strain around the anterior intestinal portal (AIP), the opening to the foregut where contraction and cardiac fusion occur. The results indicate that stiffness and tangential tension decreased bilaterally along the AIP with distance from the embryonic midline. The gradients in stiffness and tension, as well as strain rate, increased to peaks at HH9 (30 h) and decreased afterward. Exposure to the myosin II inhibitor blebbistatin reduced these effects, suggesting that they are mainly generated by active cytoskeletal contraction, and finite-element modeling indicates that the measured mechanical gradients are consistent with a relatively uniform contraction of the endodermal layer in conjunction with constraints imposed by the attached mesoderm. Taken together, our results suggest that, before HH10, endodermal contraction pulls the bilateral heart fields toward the midline where they fuse to create the HT. By HH10, however, the fusion process is far enough along to enable apposing cardiac progenitor cells to keep ‘zipping’ together during looping without the need for continued high contractile forces. These findings should shed new light on a perplexing question in early heart development.

  11. Why is cytoskeletal contraction required for cardiac fusion before but not after looping begins?

    International Nuclear Information System (INIS)

    Shi, Yunfei; Taber, Larry A; Varner, Victor D

    2015-01-01

    Cytoskeletal contraction is crucial to numerous morphogenetic processes, but its role in early heart development is poorly understood. Studies in chick embryos have shown that inhibiting myosin-II-based contraction prior to Hamburger–Hamilton (HH) stage 10 (33 h incubation) impedes fusion of the mesodermal heart fields that create the primitive heart tube (HT), as well as the ensuing process of cardiac looping. If contraction is inhibited at or after looping begins at HH10, however, fusion and looping proceed relatively normally. To explore the mechanisms behind this seemingly fundamental change in behavior, we measured spatiotemporal distributions of tissue stiffness, stress, and strain around the anterior intestinal portal (AIP), the opening to the foregut where contraction and cardiac fusion occur. The results indicate that stiffness and tangential tension decreased bilaterally along the AIP with distance from the embryonic midline. The gradients in stiffness and tension, as well as strain rate, increased to peaks at HH9 (30 h) and decreased afterward. Exposure to the myosin II inhibitor blebbistatin reduced these effects, suggesting that they are mainly generated by active cytoskeletal contraction, and finite-element modeling indicates that the measured mechanical gradients are consistent with a relatively uniform contraction of the endodermal layer in conjunction with constraints imposed by the attached mesoderm. Taken together, our results suggest that, before HH10, endodermal contraction pulls the bilateral heart fields toward the midline where they fuse to create the HT. By HH10, however, the fusion process is far enough along to enable apposing cardiac progenitor cells to keep ‘zipping’ together during looping without the need for continued high contractile forces. These findings should shed new light on a perplexing question in early heart development. (paper)

  12. 48 CFR 2432.908 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... Section 2432.908 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 2432.908 Contract clauses. (c)(1) The... other than the submission of an invoice or voucher, e.g., directly from proceeds of property sales. [71...

  13. 48 CFR 32.104 - Providing contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.104 Section 32.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.104 Providing contract financing. (a) Prudent contract financing can be a useful working tool in Government...

  14. 48 CFR 32.203 - Determining contract financing terms.

    Science.gov (United States)

    2010-10-01

    ... financing terms. 32.203 Section 32.203 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Commercial Item Purchase Financing 32.203 Determining contract financing terms. When the criteria in 32.202-1(b) are met, the contracting officer may either...

  15. 48 CFR 632.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Unusual contract financing. 632.114 Section 632.114 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 632.114 Unusual contract financing. The...

  16. 48 CFR 32.113 - Customary contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.113 Section 32.113 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.113 Customary contract financing. The solicitation must specify the customary contract financing offerors may...

  17. 48 CFR 2432.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Unusual contract financing... DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 2432.114 Unusual contract financing. The Senior Procurement Executive is the agency head for the purpose of...

  18. Store-operated calcium entry is required for sustained contraction and Ca2+ oscillations of airway smooth muscle.

    Science.gov (United States)

    Chen, Jun; Sanderson, Michael J

    2017-05-15

    Airway hyper-responsiveness in asthma is driven by excessive contraction of airway smooth muscle cells (ASMCs). Agonist-induced Ca 2+ oscillations underlie this contraction of ASMCs and the magnitude of this contraction is proportional to the Ca 2+ oscillation frequency. Sustained contraction and Ca 2+ oscillations require an influx of extracellular Ca 2+ , although the mechanisms and pathways mediating this Ca 2+ influx during agonist-induced ASMC contraction are not well defined. By inhibiting store-operated calcium entry (SOCE) or voltage-gated Ca 2+ channels (VGCCs), we show that SOCE, rather than Ca 2+ influx via VGCCs, provides the major Ca 2+ entry pathway into ASMCs to sustain ASMCs contraction and Ca 2+ oscillations. SOCE may therefore serve as a potential target for new bronchodilators to reduce airway hyper-responsiveness in asthma. Asthma is characterized by airway hyper-responsiveness: the excessive contraction of airway smooth muscle. The extent of this airway contraction is proportional to the frequency of Ca 2+ oscillations within airway smooth muscle cells (ASMCs). Sustained Ca 2+ oscillations require a Ca 2+ influx to replenish Ca 2+ losses across the plasma membrane. Our previous studies implied store-operated calcium entry (SOCE) as the major pathway for this Ca 2+ influx. In the present study, we explore this hypothesis, by examining the effects of SOCE inhibitors (GSK7975A and GSK5498A) as well as L-type voltage-gated Ca 2+ channel inhibitors (nifedipine and nimodipine) on airway contraction and Ca 2+ oscillations and SOCE-mediated Ca 2+ influx in ASMCs within mouse precision-cut lung slices. We found that both GSK7975A and GSK5498A were able to fully relax methacholine-induced airway contraction by abolishing the Ca 2+ oscillations, in a manner similar to that observed in zero extracellular Ca 2+ ([Ca 2+ ] e ). In addition, GSK7975A and GSK5498A inhibited increases in intracellular Ca 2+ ([Ca 2+ ] i ) in ASMCs with depleted Ca 2+ -stores in

  19. Double Dutch : On the role of the transparency requirement with regard to the language in which standard contract terms for B2C-contracts must be drafted

    NARCIS (Netherlands)

    Loos, M.

    2017-01-01

    European legislation currently does not clearly determine in what language standard contract terms must be drafted in order to be validly incorporated into consumer contracts so they can be relied upon by a trader. This may be particularly problematic in the case of a cross-border contract as

  20. 48 CFR 742.1170-4 - Progress reporting requirements and contract clause.

    Science.gov (United States)

    2010-10-01

    ... progress. (b) Because the cognizant technical officer is the individual most familiar with the contractor's performance, the contractor must submit the progress reports directly to the cognizant technical officer. The cognizant technical officer must review the reports and advise the contracting officer, in writing, of any...

  1. The small GTPase Rac1 is required for smooth muscle contraction

    DEFF Research Database (Denmark)

    Rahman, Awahan; Davis, Benjamin; Lövdahl, Cecilia

    2014-01-01

    The role of the small GTP-binding protein Rac1 in smooth muscle contraction was examined using small molecule inhibitors (EHT1864, NSC23766) and a novel smooth muscle-specific, conditional, Rac1 knockout mouse strain. EHT1864, which affects nucleotide binding and inhibits Rac1 activity, concentra...

  2. Light transport and general aviation aircraft icing research requirements

    Science.gov (United States)

    Breeze, R. K.; Clark, G. M.

    1981-01-01

    A short term and a long term icing research and technology program plan was drafted for NASA LeRC based on 33 separate research items. The specific items listed resulted from a comprehensive literature search, organized and assisted by a computer management file and an industry/Government agency survey. Assessment of the current facilities and icing technology was accomplished by presenting summaries of ice sensitive components and protection methods; and assessments of penalty evaluation, the experimental data base, ice accretion prediction methods, research facilities, new protection methods, ice protection requirements, and icing instrumentation. The intent of the research plan was to determine what icing research NASA LeRC must do or sponsor to ultimately provide for increased utilization and safety of light transport and general aviation aircraft.

  3. 48 CFR 22.404-12 - Labor standards for contracts containing construction requirements and option provisions that...

    Science.gov (United States)

    2010-10-01

    ... contracting officer may include in the contract a separately specified pricing method that permits an... wage determination into the contract, and must apply the specific pricing method to calculate the contract price adjustment. An example of a contract pricing method that the contracting officer might...

  4. A GENERALIZATION OF TRADITIONAL KANO MODEL FOR CUSTOMER REQUIREMENTS ANALYSIS

    Directory of Open Access Journals (Sweden)

    Renáta Turisová

    2015-07-01

    Full Text Available Purpose: The theory of attractiveness determines the relationship between the technically achieved and customer perceived quality of product attributes. The most frequently used approach in the theory of attractiveness is the implementation of Kano‘s model. There exist a lot of generalizations of that model which take into consideration various aspects and approaches focused on understanding the customer preferences and identification of his priorities for a selling  product. The aim of this article is to outline another possible generalization of Kano‘s model.Methodology/Approach: The traditional Kano’s model captures the nonlinear relationship between reached attributes of quality and customer requirements. The individual attributes of quality are divided into three main categories: must-be, one-dimensional, attractive quality and into two side categories: indifferent and reverse quality. The well selling product has to contain the must-be attribute. It should contain as many one-dimensional attributes as possible. If there are also supplementary attractive attributes, it means that attractiveness of the entire product, from the viewpoint of the customer, nonlinearly sharply rises what has a direct positive impact on a decision of potential customer when purchasing the product. In this article, we show that inclusion of individual quality attributes of a product to the mentioned categories depends, among other things, also on costs on life cycle of the product, respectively on a price of the product on the market.Findings: In practice, we are often encountering the inclusion of products into different price categories: lower, middle and upper class. For a certain type of products the category is either directly declared by a producer (especially in automotive industry, or is determined by a customer by means of assessment of available market prices. To each of those groups of a products different customer expectations can be assigned

  5. 48 CFR 1532.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 1532.102 Section 1532.102 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING General 1532.102 Description of contract financing methods. Progress payments based on a percentage or stage of completion are authorized for use as...

  6. Testing for Spanning with Futrures Contracts and Nontraded Assets : A General Approach

    NARCIS (Netherlands)

    Nijman, T.E.; de Roon, F.A.; Werker, B.J.M.

    1996-01-01

    This paper generalizes the notion of mean-variance spanning as de- ned in the seminal paper of Huberman & Kandel (1987) in three di- mensions.It is shown how regression techniques can be used to test for spanning for more general classes of utility functions, in case some as- sets are nontraded, and

  7. 14 CFR 61.103 - Eligibility requirements: General.

    Science.gov (United States)

    2010-01-01

    ... that the person is prepared for the required knowledge test. (e) Pass the required knowledge test on... category and class rating sought. (j) Hold a U.S. student pilot certificate, sport pilot certificate, or...

  8. Continuous evolution of equations and inclusions involving set-valued contraction mappings with applications to generalized fractal transforms

    Directory of Open Access Journals (Sweden)

    Herb Kunze

    2014-06-01

    Full Text Available Let T be a set-valued contraction mapping on a general Banach space $\\mathcal{B}$. In the first part of this paper we introduce the evolution inclusion $\\dot x + x \\in Tx$ and study the convergence of solutions to this inclusion toward fixed points of T. Two cases are examined: (i T has a fixed point $\\bar y \\in \\mathcal{B}$ in the usual sense, i.e., $\\bar y = T \\bar y$ and (ii T has a fixed point in the sense of inclusions, i.e., $\\bar y \\in T \\bar y$. In the second part we extend this analysis to the case of set-valued evolution equations taking the form $\\dot x + x = Tx$. We also provide some applications to generalized fractal transforms.

  9. 42 CFR 434.6 - General requirements for all contracts and subcontracts.

    Science.gov (United States)

    2010-10-01

    ... appropriate to the service or activity delegated under the subcontract. (c) Continued responsibility of contractor. No subcontract terminates the legal responsibility of the contractor to the agency to assure that...

  10. 75 FR 29456 - Acquisition Regulation: Subchapter E-General Contracting Requirements, Subchapter F-Special...

    Science.gov (United States)

    2010-05-26

    .... This rule will have no impact on the autonomy or integrity of the family as an institution. Accordingly... with the Chief Financial Officer, Headquarters, will approve or deny the request. For NNSA, the NNSA Senior Procurement Executive will coordinate with the NNSA Chief Financial Officer before approving or...

  11. 75 FR 964 - Acquisition Regulation: Subchapter E-General Contracting Requirements, Subchapter F-Special...

    Science.gov (United States)

    2010-01-07

    ... the autonomy or integrity of the family as an institution. Accordingly, DOE has concluded that it is..., to the DOE Senior Procurement Executive, who, after coordination with the Chief Financial Officer... with the NNSA Chief Financial Officer before approving or denying the request. * * * * * 932.605...

  12. 42 CFR 413.75 - Direct GME payments: General requirements.

    Science.gov (United States)

    2010-10-01

    ...-based providers for the costs of approved residency programs in medicine, osteopathy, dentistry, and... activities means the care and treatment of particular patients, including services for which a physician or..., general internal medicine, general pediatrics, preventive medicine, geriatric medicine or osteopathic...

  13. 18 CFR 157.6 - Applications; general requirements.

    Science.gov (United States)

    2010-04-01

    ... showing the revenue responsibility for each firm rate schedule under the pipeline's currently effective... this section requires an applicant to reveal Critical Energy Infrastructure Information (CEII), as...

  14. 76 FR 78010 - General Services Administration Acquisition Regulation; Information Collection; Contract...

    Science.gov (United States)

    2011-12-15

    ... collection of information is accurate and based on valid assumptions and methodology; and ways to enhance the...: February 13, 2012. FOR FURTHER INFORMATION CONTACT: Ms. Dana Munson, Procurement Analyst, General Services.../or business confidential information provided. SUPPLEMENTARY INFORMATION: A. Purpose Under certain...

  15. 14 CFR 61.153 - Eligibility requirements: General.

    Science.gov (United States)

    2010-01-01

    ... the English language. If the applicant is unable to meet one of these requirements due to medical... rating issued under this part; (2) Meet the military experience requirements under § 61.73 of this part... military pilot or former rated military pilot of an Armed Force of the United States; or (3) Holds either a...

  16. 14 CFR 61.123 - Eligibility requirements: General.

    Science.gov (United States)

    2010-01-01

    ... must: (a) Be at least 18 years of age; (b) Be able to read, speak, write, and understand the English language. If the applicant is unable to meet one of these requirements due to medical reasons, then the... who: (1) Conducted the required ground training or reviewed the person's home study on the...

  17. 20 CFR 663.705 - What are the requirements for OJT contracts for employed workers?

    Science.gov (United States)

    2010-04-01

    ... for employed workers? 663.705 Section 663.705 Employees' Benefits EMPLOYMENT AND TRAINING... INVESTMENT ACT On-the-Job Training (OJT) and Customized Training § 663.705 What are the requirements for OJT... production or service procedures, upgrading to new jobs that require additional skills, workplace literacy...

  18. Predisposal management of radioactive waste. General safety requirements. Pt. 5

    International Nuclear Information System (INIS)

    2009-01-01

    The objective of this Safety Requirements publication is to establish, the requirements that must be satisfied in the predisposal management of radioactive waste. This publication sets out the objectives, criteria and requirements for the protection of human health and the environment that apply to the siting, design, construction, commissioning, operation and shutdown of facilities for the predisposal management of radioactive waste, and the requirements that must be met to ensure the safety of such facilities and activities. This Safety Requirements publication applies to the predisposal management of radioactive waste of all types and covers all the steps in its management from its generation up to its disposal, including its processing (pretreatment, treatment and conditioning), storage and transport. Such waste may arise from the commissioning, operation and decommissioning of nuclear facilities; the use of radionuclides in medicine, industry, agriculture, research and education; the processing of materials that contain naturally occurring radionuclides; and the remediation of contaminated areas. The introduction of the document (Section 1) informs about its objective, scope and structure. The protection of human health and the environment is considered in Section 2 of this publication. Section 3 establishes requirements for the responsibilities associated with the predisposal management of radioactive waste. Requirements for the principal approaches to and the elements of the predisposal management of radioactive waste are established in Section 4. Section 5 establishes requirements for the safe development and operation of predisposal radioactive waste management facilities and safe conduct of activities. The Annex presents a discussion of the consistency of the safety requirements established in this publication with the fundamental safety principles

  19. 12 CFR 226.5 - General disclosure requirements.

    Science.gov (United States)

    2010-01-01

    ... paragraph (b)(2) does not apply if the creditor is unable to meet the requirement because of an act of God, war, civil disorder, natural disaster, or strike. (3) Credit and charge card application and...

  20. 15 CFR 801.3 - General reporting requirements.

    Science.gov (United States)

    2010-01-01

    ...) BUREAU OF ECONOMIC ANALYSIS, DEPARTMENT OF COMMERCE SURVEY OF INTERNATIONAL TRADE IN SERVICES BETWEEN U.S... the U.S. Government, engaged in international trade in services. Specific reporting requirements for a...

  1. 46 CFR 310.54 - General requirements for eligibility.

    Science.gov (United States)

    2010-10-01

    ...) Nominees from foreign nations; (2) nominees from the Northern Mariana Islands; (3) designees from the Trust... candidate, as a result of the investigation, fail to meet the requirements established for appointment as...

  2. GENERAL REQUIREMENTS FOR SIMULATION MODELS IN WASTE MANAGEMENT

    International Nuclear Information System (INIS)

    Miller, Ian; Kossik, Rick; Voss, Charlie

    2003-01-01

    Most waste management activities are decided upon and carried out in a public or semi-public arena, typically involving the waste management organization, one or more regulators, and often other stakeholders and members of the public. In these environments, simulation modeling can be a powerful tool in reaching a consensus on the best path forward, but only if the models that are developed are understood and accepted by all of the parties involved. These requirements for understanding and acceptance of the models constrain the appropriate software and model development procedures that are employed. This paper discusses requirements for both simulation software and for the models that are developed using the software. Requirements for the software include transparency, accessibility, flexibility, extensibility, quality assurance, ability to do discrete and/or continuous simulation, and efficiency. Requirements for the models that are developed include traceability, transparency, credibility/validity, and quality control. The paper discusses these requirements with specific reference to the requirements for performance assessment models that are used for predicting the long-term safety of waste disposal facilities, such as the proposed Yucca Mountain repository

  3. [Precision medicine : a required approach for the general internist].

    Science.gov (United States)

    Waeber, Gérard; Cornuz, Jacques; Gaspoz, Jean-Michel; Guessous, Idris; Mooser, Vincent; Perrier, Arnaud; Simonet, Martine Louis

    2017-01-18

    The general internist cannot be a passive bystander of the anticipated medical revolution induced by precision medicine. This latter aims to improve the predictive and/or clinical course of an individual by integrating all biological, genetic, environmental, phenotypic and psychosocial knowledge of a person. In this article, national and international initiatives in the field of precision medicine are discussed as well as the potential financial, ethical and limitations of personalized medicine. The question is not to know if precision medicine will be part of everyday life but rather to integrate early the general internist in multidisciplinary teams to ensure optimal information and shared-decision process with patients and individuals.

  4. 40 CFR 451.3 - General reporting requirements.

    Science.gov (United States)

    2010-07-01

    ... AND STANDARDS CONCENTRATED AQUATIC ANIMAL PRODUCTION POINT SOURCE CATEGORY § 451.3 General reporting... authority of the use in a concentrated aquatic animal production facility subject to this part of any..., the permittee must provide an oral report to the permitting authority as soon as possible, preferably...

  5. 14 CFR 1216.204 - General implementation requirements.

    Science.gov (United States)

    2010-01-01

    ... the general public as well as employees. These plans will include the integration of adequate warning... new authorizations or appropriations transmitted to the Office of Management and Budget shall indicate... would not impact the floodplain or wetlands. (ii) The only alternative would be to construct new...

  6. Overview of contaminant arrival distributions as general evaluation requirements

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    The environmental consequences of subsurface contamination problems can be completely and effectively evaluated by fulfilling the following five requirements: Determine each present or future outflow boundary of contaminated groundwater; provide the location/arrival-time distributions; provide the location/outflow-quantity distributions; provide these distributions for each individual chemical or biological constituent of environmental importance; and use the arrival distributions to determine the quantity and concentration of each contaminant that will interface with the environment as time passes. The arrival distributions on which these requirements are based provide a reference point for communication among scientists and public decision makers by enabling complicated scientific analyses to be presented as simple summary relationships

  7. Spherically symmetric models with pressure: separating expansion from contraction and generalizing TOV condition

    CERN Document Server

    Mimoso, José Pedro; Mena, Filipe C

    2010-01-01

    We investigate spherically symmetric perfect fluid spacetimes and discuss the existence and stability of a dividing shell separating expanding and collapsing regions. We perform a 3+1 splitting and obtain gauge invariant conditions relating the intrinsic spatial curvature of the shells to the ADM mass and to a function of the pressure which we introduce and that generalises the Tolman-Oppenheimer-Volkoff equilibrium condition. We analyse the particular cases of the Lema\\^itre-Tolman-Bondi dust models with a cosmological constant as an example of a $\\Lambda$-CDM model and its generalization to contain a central perfect fluid core. These models provide simple, but physically interesting illustrations of our results.

  8. 40 CFR 26.1116 - General requirements for informed consent.

    Science.gov (United States)

    2010-07-01

    ... PROTECTION OF HUMAN SUBJECTS Basic Ethical Requirements for Third-Party Human Research for Pesticides... informed consent. No investigator may involve a human being as a subject in research covered by this... subject's legal rights, or releases or appears to release the investigator, the sponsor, the institution...

  9. 21 CFR 50.23 - Exception from general requirements.

    Science.gov (United States)

    2010-04-01

    ... person directing that the specimen be collected to know, at the time the specimen was collected, that... system is capable of tracking and will be used to track the proposed treatment from supplier to the... investigator (e.g., clinical laboratory director or other responsible person), required to preserve the life of...

  10. 49 CFR 229.137 - Sanitation, general requirements.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Safety Requirements Cabs and... for duty or occupying the cab for duty; and (6) Equipped with a trash receptacle, unless the railroad otherwise provides portable trash receptacles to employees upon reporting for duty or occupying the cab for...

  11. 40 CFR 92.124 - Test sequence; general requirements.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92...) For the testing of locomotives and engines, the atmospheric pressure shall be between 31.0 inches Hg... test conditions. (c) No control of humidity is required for ambient air, engine intake air or dilution...

  12. 29 CFR 793.4 - General requirements for exemption.

    Science.gov (United States)

    2010-07-01

    ... AND TELEVISION STATION EMPLOYEES FROM OVERTIME PAY REQUIREMENTS UNDER SECTION 13(b)(9) OF THE FAIR... employee must be “employed as” an announcer, or a news editor, or a chief engineer. (b) The employee must be employed “by” a radio or television station. (c) The major studio of such radio or television...

  13. 17 CFR 4.24 - General disclosures required.

    Science.gov (United States)

    2010-04-01

    ... tabular format, an analysis setting forth how the break-even point for the pool was calculated. The... feature becomes operative; and (3) Disclose, in the break-even analysis required by § 4.24(i)(6), the... page number) AND A STATEMENT OF THE PERCENTAGE RETURN NECESSARY TO BREAK EVEN, THAT IS, TO RECOVER THE...

  14. 40 CFR 158.1000 - Applicator exposure-general requirements.

    Science.gov (United States)

    2010-07-01

    ... requirements. 158.1000 Section 158.1000 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Occupational Safety and Health Administration (OSHA), provide adequate protection from risk under FIFRA for a... and the applicator activity of concern, including formulation type, application methods and rates...

  15. 12 CFR 226.17 - General disclosure requirements.

    Science.gov (United States)

    2010-01-01

    ... mandatory compliance date of §§ 226.46, 47, and 48, the creditor need not make the following disclosures...) Form of disclosures. (1) The creditor shall make the disclosures required by this subpart clearly and... segregated from everything else, and shall not contain any information not directly related 37 to the...

  16. 47 CFR 15.319 - General technical requirements.

    Science.gov (United States)

    2010-10-01

    ...-equivalent voltage. The measurement results shall be properly adjusted for any instrument limitations, such... bandwidth, sensitivity, etc., so as to obtain a true peak measurement for the emission in question over the... point. (i) Unlicensed PCS devices are subject to the radiofrequency radiation exposure requirements...

  17. 40 CFR 725.25 - General administrative requirements.

    Science.gov (United States)

    2010-07-01

    ... SUBSTANCES CONTROL ACT REPORTING REQUIREMENTS AND REVIEW PROCESSES FOR MICROORGANISMS Administrative...: The company named in this submission intends to manufacture, import, or process for a commercial... e-PMN software must be used to print the biotechnology notice submission to be sent to EPA. Paper...

  18. 14 CFR 65.101 - Eligibility requirements: General.

    Science.gov (United States)

    2010-01-01

    ..., appropriate to the job for which he is employed; (3) Be employed for a specific job requiring those special... aircraft or components, appropriate to the job for which he is employed; (5) Have either— (i) At least 18 months of practical experience in the procedures, practices, inspection methods, materials, tools...

  19. 14 CFR 61.96 - Applicability and eligibility requirements: General.

    Science.gov (United States)

    2010-01-01

    ... certificate must: (1) Be at least 17 years of age; (2) Be able to read, speak, write, and understand the English language. If the applicant is unable to meet one of these requirements due to medical reasons... authorized instructor who— (i) Conducted the training or reviewed the applicant's home study on the...

  20. 40 CFR 63.6105 - What are my general requirements for complying with this subpart?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my general requirements for... Turbines General Compliance Requirements § 63.6105 What are my general requirements for complying with this..., oxidation catalyst emission control device or other air pollution control equipment, and monitoring...

  1. Leadership and Management for Safety. General Safety Requirements (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    his Safety Requirements publication establishes requirements that support Principle 3 of the Fundamental Safety Principles in relation to establishing, sustaining and continuously improving leadership and management for safety and an integrated management system. It emphasizes that leadership for safety, management for safety, an effective management system and a systemic approach (i.e. an approach in which interactions between technical, human and organizational factors are duly considered) are all essential to the specification and application of adequate safety measures and to the fostering of a strong safety culture. Leadership and an effective management system will integrate safety, health, environmental, security, quality, human-and-organizational factors, societal and economic elements. The management system will ensure the fostering of a strong safety culture, regular assessment of performance and the application of lessons from experience. The publication is intended for use by regulatory bodies, operating organizations and other organizations concerned with facilities and activities that give rise to radiation risks.

  2. Decommissioning of Facilities. General Safety Requirements. Pt. 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-07-15

    Decommissioning is the last step in the lifetime management of a facility. It must also be considered during the design, construction, commissioning and operation of facilities. This publication establishes requirements for the safe decommissioning of a broad range of facilities: nuclear power plants, research reactors, nuclear fuel cycle facilities, facilities for processing naturally occurring radioactive material, former military sites, and relevant medical, industrial and research facilities. It addresses all the aspects of decommissioning that are required to ensure safety, aspects such as roles and responsibilities, strategy and planning for decommissioning, conduct of decommissioning actions and termination of the authorization for decommissioning. It is intended for use by those involved in policy development, regulatory control and implementation of decommissioning.

  3. Leadership and Management for Safety. General Safety Requirements (French Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This Safety Requirements publication establishes requirements that support Principle 3 of the Fundamental Safety Principles in relation to establishing, sustaining and continuously improving leadership and management for safety and an integrated management system. It emphasizes that leadership for safety, management for safety, an effective management system and a systemic approach (i.e. an approach in which interactions between technical, human and organizational factors are duly considered) are all essential to the specification and application of adequate safety measures and to the fostering of a strong safety culture. Leadership and an effective management system will integrate safety, health, environmental, security, quality, human-and-organizational factors, societal and economic elements. The management system will ensure the fostering of a strong safety culture, regular assessment of performance and the application of lessons from experience. The publication is intended for use by regulatory bodies, operating organizations and other organizations concerned with facilities and activities that give rise to radiation risks.

  4. Leadership and Management for Safety. General Safety Requirements (Arabic Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This Safety Requirements publication establishes requirements that support Principle 3 of the Fundamental Safety Principles in relation to establishing, sustaining and continuously improving leadership and management for safety and an integrated management system. It emphasizes that leadership for safety, management for safety, an effective management system and a systemic approach (i.e. an approach in which interactions between technical, human and organizational factors are duly considered) are all essential to the specification and application of adequate safety measures and to the fostering of a strong safety culture. Leadership and an effective management system will integrate safety, health, environmental, security, quality, human-and-organizational factors, societal and economic elements. The management system will ensure the fostering of a strong safety culture, regular assessment of performance and the application of lessons from experience. The publication is intended for use by regulatory bodies, operating organizations and other organizations concerned with facilities and activities that give rise to radiation risks.

  5. Leadership and Management for Safety. General Safety Requirements (Chinese Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This Safety Requirements publication establishes requirements that support Principle 3 of the Fundamental Safety Principles in relation to establishing, sustaining and continuously improving leadership and management for safety and an integrated management system. It emphasizes that leadership for safety, management for safety, an effective management system and a systemic approach (i.e. an approach in which interactions between technical, human and organizational factors are duly considered) are all essential to the specification and application of adequate safety measures and to the fostering of a strong safety culture. Leadership and an effective management system will integrate safety, health, environmental, security, quality, human-and-organizational factors, societal and economic elements. The management system will ensure the fostering of a strong safety culture, regular assessment of performance and the application of lessons from experience. The publication is intended for use by regulatory bodies, operating organizations and other organizations concerned with facilities and activities that give rise to radiation risks.

  6. Leadership and Management for Safety. General Safety Requirements

    International Nuclear Information System (INIS)

    2016-01-01

    This Safety Requirements publication establishes requirements that support Principle 3 of the Fundamental Safety Principles in relation to establishing, sustaining and continuously improving leadership and management for safety and an integrated management system. It emphasizes that leadership for safety, management for safety, an effective management system and a systemic approach (i.e. an approach in which interactions between technical, human and organizational factors are duly considered) are all essential to the specification and application of adequate safety measures and to the fostering of a strong safety culture. Leadership and an effective management system will integrate safety, health, environmental, security, quality, human-and-organizational factor, societal and economic elements. The management system will ensure the fostering of a strong safety culture, regular assessment of performance and the application of lessons from experience. The publication is intended for use by regulatory bodies, operating organizations (registrants and licensees) and other organizations concerned with facilities and activities that give rise to radiation risks

  7. Predisposal Management of Radioactive Waste. General Safety Requirements Pt. 5

    International Nuclear Information System (INIS)

    2010-01-01

    There are a large number of facilities and activities around the world in which radioactive material is produced, handled and stored. This Safety Requirements publication presents international consensus requirements for the management of radioactive waste prior to its disposal. It provides the safety imperatives on the basis of which facilities can be designed, operated and regulated. The publication is supported by a number of Safety Guides that provide up to date recommendations and guidance on best practices for management of particular types of radioactive waste, for storage of radioactive waste, for assuring safety by developing safety cases and supporting safety assessments, and for applying appropriate management systems. Contents: 1. Introduction; 2. Protection of human health and the environment; 3. Responsibilities associated with the predisposal management of radioactive waste; 4. Steps in the predisposal management of radioactive waste; 5. Development and operation of predisposal radioactive waste management facilities and activities; Annex: Predisposal management of radioactive waste and the fundamental safety principles.

  8. Decommissioning of Facilities. General Safety Requirements. Pt. 6 (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    Decommissioning is the last step in the lifetime management of a facility. It must also be considered during the design, construction, commissioning and operation of facilities. This publication establishes requirements for the safe decommissioning of a broad range of facilities: nuclear power plants, research reactors, nuclear fuel cycle facilities, facilities for processing naturally occurring radioactive material, former military sites, and relevant medical, industrial and research facilities. It addresses all the aspects of decommissioning that are required to ensure safety, aspects such as roles and responsibilities, strategy and planning for decommissioning, conduct of decommissioning actions and termination of the authorization for decommissioning. It is intended for use by those involved in policy development, regulatory control and implementation of decommissioning.

  9. Decommissioning of Facilities. General Safety Requirements. Pt. 6 (Russian Edition)

    International Nuclear Information System (INIS)

    2015-01-01

    Decommissioning is the last step in the lifetime management of a facility. It must also be considered during the design, construction, commissioning and operation of facilities. This publication establishes requirements for the safe decommissioning of a broad range of facilities: nuclear power plants, research reactors, nuclear fuel cycle facilities, facilities for processing naturally occurring radioactive material, former military sites, and relevant medical, industrial and research facilities. It addresses all the aspects of decommissioning that are required to ensure safety, aspects such as roles and responsibilities, strategy and planning for decommissioning, conduct of decommissioning actions and termination of the authorization for decommissioning. It is intended for use by those involved in policy development, regulatory control and implementation of decommissioning

  10. Predisposal Management of Radioactive Waste. General Safety Requirements Pt. 5

    International Nuclear Information System (INIS)

    2009-01-01

    There are a large number of facilities and activities around the world in which radioactive material is produced, handled and stored. This Safety Requirements publication presents international consensus requirements for the management of radioactive waste prior to its disposal. It provides the safety imperatives on the basis of which facilities can be designed, operated and regulated. The publication is supported by a number of Safety Guides that provide up to date recommendations and guidance on best practices for management of particular types of radioactive waste, for storage of radioactive waste, for assuring safety by developing safety cases and supporting safety assessments, and for applying appropriate management systems. Contents: 1. Introduction; 2. Protection of human health and the environment; 3. Responsibilities associated with the predisposal management of radioactive waste; 4. Steps in the predisposal management of radioactive waste; 5. Development and operation of predisposal radioactive waste management facilities and activities; Annex: Predisposal management of radioactive waste and the fundamental safety principles.

  11. Management of transport and handling contracts

    CERN Document Server

    Rühl, I

    2004-01-01

    This paper shall outline the content, application and management strategies for the various contracts related to transport and handling activities. In total, the two sections Logistics and Handling Maintenance are in charge of 27 (!) contracts ranging from small supply contracts to big industrial support contracts. The activities as well as the contracts can generally be divided into four main topics "Vehicle Fleet Management"; "Supply, Installation and Commissioning of Lifting and Hoisting Equipment"; "Equipment Maintenance" and "Industrial Support for Transport and Handling". Each activity and contract requires different approaches and permanent adaptation to the often changing CERN's requirements. In particular, the management and the difficulties experienced with the contracts E072 "Maintenance of lifting and hoisting equipment", F420 "Supply of seven overhead traveling cranes for LHC" and S090/S103 "Industrial support for transport and handling" will be explained in detail.

  12. Cytoskeletal Tropomyosin Tm5NM1 Is Required for Normal Excitation–Contraction Coupling in Skeletal Muscle

    Science.gov (United States)

    Vlahovich, Nicole; Kee, Anthony J.; Van der Poel, Chris; Kettle, Emma; Hernandez-Deviez, Delia; Lucas, Christine; Lynch, Gordon S.; Parton, Robert G.; Gunning, Peter W.

    2009-01-01

    The functional diversity of the actin microfilaments relies in part on the actin binding protein tropomyosin (Tm). The muscle-specific Tms regulate actin-myosin interactions and hence contraction. However, there is less known about the roles of the numerous cytoskeletal isoforms. We have shown previously that a cytoskeletal Tm, Tm5NM1, defines a Z-line adjacent cytoskeleton in skeletal muscle. Recently, we identified a second cytoskeletal Tm in this region, Tm4. Here we show that Tm4 and Tm5NM1 define separate actin filaments; the former associated with the terminal sarcoplasmic reticulum (SR) and other tubulovesicular structures. In skeletal muscles of Tm5NM1 knockout (KO) mice, Tm4 localization was unchanged, demonstrating the specificity of the membrane association. Tm5NM1 KO muscles exhibit potentiation of T-system depolarization and decreased force rundown with repeated T-tubule depolarizations consistent with altered T-tubule function. These results indicate that a Tm5NM1-defined actin cytoskeleton is required for the normal excitation–contraction coupling in skeletal muscle. PMID:19005216

  13. Cytoskeletal tropomyosin Tm5NM1 is required for normal excitation-contraction coupling in skeletal muscle.

    Science.gov (United States)

    Vlahovich, Nicole; Kee, Anthony J; Van der Poel, Chris; Kettle, Emma; Hernandez-Deviez, Delia; Lucas, Christine; Lynch, Gordon S; Parton, Robert G; Gunning, Peter W; Hardeman, Edna C

    2009-01-01

    The functional diversity of the actin microfilaments relies in part on the actin binding protein tropomyosin (Tm). The muscle-specific Tms regulate actin-myosin interactions and hence contraction. However, there is less known about the roles of the numerous cytoskeletal isoforms. We have shown previously that a cytoskeletal Tm, Tm5NM1, defines a Z-line adjacent cytoskeleton in skeletal muscle. Recently, we identified a second cytoskeletal Tm in this region, Tm4. Here we show that Tm4 and Tm5NM1 define separate actin filaments; the former associated with the terminal sarcoplasmic reticulum (SR) and other tubulovesicular structures. In skeletal muscles of Tm5NM1 knockout (KO) mice, Tm4 localization was unchanged, demonstrating the specificity of the membrane association. Tm5NM1 KO muscles exhibit potentiation of T-system depolarization and decreased force rundown with repeated T-tubule depolarizations consistent with altered T-tubule function. These results indicate that a Tm5NM1-defined actin cytoskeleton is required for the normal excitation-contraction coupling in skeletal muscle.

  14. REQUIREMENTS PATTERNS FOR FORMAL CONTRACTS IN ARCHITECTURAL ANALYSIS AND DESIGN LANGUAGE (AADL) MODELS

    Science.gov (United States)

    2017-04-17

    because of simultaneous failures in two of the aircrafts braking system . The architecture of the primary Braking System Control Unit (BSCU) is...is a component of the overall Flight Control System (FCS) that compares the measured state of an aircraft (position, speed, and attitude) to the...Cyberphysical Systems , Formal Methods, Requirements Patterns, AADL, Assume Guarantee Reasoning Environment 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF

  15. A Generalized Cauchy Distribution Framework for Problems Requiring Robust Behavior

    Directory of Open Access Journals (Sweden)

    Carrillo RafaelE

    2010-01-01

    Full Text Available Statistical modeling is at the heart of many engineering problems. The importance of statistical modeling emanates not only from the desire to accurately characterize stochastic events, but also from the fact that distributions are the central models utilized to derive sample processing theories and methods. The generalized Cauchy distribution (GCD family has a closed-form pdf expression across the whole family as well as algebraic tails, which makes it suitable for modeling many real-life impulsive processes. This paper develops a GCD theory-based approach that allows challenging problems to be formulated in a robust fashion. Notably, the proposed framework subsumes generalized Gaussian distribution (GGD family-based developments, thereby guaranteeing performance improvements over traditional GCD-based problem formulation techniques. This robust framework can be adapted to a variety of applications in signal processing. As examples, we formulate four practical applications under this framework: (1 filtering for power line communications, (2 estimation in sensor networks with noisy channels, (3 reconstruction methods for compressed sensing, and (4 fuzzy clustering.

  16. 48 CFR 2937.103-70 - Department of Labor checklist to aid analysis and review of requirements for service contracts.

    Science.gov (United States)

    2010-10-01

    ... provide for adequate monitoring of contractor performance? (3) Is the statement of work written so that it... contract? (4) Will the contractor be evaluating a competitor's work? (5) Does the contract allow the...

  17. Toward a General Theory of Commitment, Renegotiation and Contract Incompleteness : (II) Commitment Problem and Optimal Incentive Schemes in Agency with Bilateral Moral Hazard

    OpenAIRE

    Suzuki, Yutaka

    1998-01-01

    This paper investigates the characteristics of the optimal incentive contracts when the principal is also a productive agent. In this bilateral moral hazard framework, the two requirements should be satisfied in designing an incentive scheme. One is the agent's incentive provision and the other is the principal's incentive provision. Because of the trade off between these two incentive provisions, only the second best is obtainable if the incentive contract should be based only on the total o...

  18. General survey of applications which require actinide nuclear data

    International Nuclear Information System (INIS)

    Raman, S.

    1976-01-01

    This review paper discusses the actinide waste problem, the buildup of toxic isotopes in the fuel, the neutron activity associated with irradiated fuel, the 252 Cf buildup problem, and the production of radioisotope power sources as broad areas that require actinide cross-section data. Decay data enter into the area of radiological safety and health physics. This paper also discusses a few cross-section measurements in progress at the Oak Ridge Electron Linear Accelerator. The availability of actinide samples through the Transuranium Program at Oak Ridge is discussed in considerable detail. The present data status with respect to the various applications is reviewed along with recommendations for improving the data base

  19. Evolution of general design requirements for french pressurized water reactors

    International Nuclear Information System (INIS)

    Gros, G.; Jalouneix, J.; Rollinger, F.

    1988-10-01

    The design of French pressurized water reactors is based first on deterministic principles, using the well-known defense in depth concept. This safety approach, basically reflected current American practice at that time, which consisted notably in designing engineered safeguard systems capable of limiting the consequences of accidents assumed to be credible despite the preventive measures taken. Further reflections have led to complete this approach, resulting in modifications to regulatory practice, mainly related to better practical assimilation of the problems arising during plant unit operation and reactor control after an accident and to the determination to enhance the overall consistency of the safety approach. As regards system redundancy, it should be noted that common cause failures can result in the total loss of a redundant system. System redundancy aspects will be dealt with in Chapter 2. As regards study of design basis accidents, attention was focused on the human intervention stage following automatic activation of protection and safeguard systems. This resulted, for all plant units, in the revision of operating procedures, accompanied by examination of the means required for their implementation. These subjects will be discussed in Chapter 3. Finally, as regards equipment classification, the range of equipment subjected to particular requirements, formerly limited to design basis safety classified equipment, was enlarged to include important for safety equipment. This subject will be dealt with in Chapter 5

  20. Visual short-term memory always requires general attention.

    Science.gov (United States)

    Morey, Candice C; Bieler, Malte

    2013-02-01

    The role of attention in visual memory remains controversial; while some evidence has suggested that memory for binding between features demands no more attention than does memory for the same features, other evidence has indicated cognitive costs or mnemonic benefits for explicitly attending to bindings. We attempted to reconcile these findings by examining how memory for binding, for features, and for features during binding is affected by a concurrent attention-demanding task. We demonstrated that performing a concurrent task impairs memory for as few as two visual objects, regardless of whether each object includes one or more features. We argue that this pattern of results reflects an essential role for domain-general attention in visual memory, regardless of the simplicity of the to-be-remembered stimuli. We then discuss the implications of these findings for theories of visual working memory.

  1. 26 CFR 1.401(a)(9)-6 - Required minimum distributions for defined benefit plans and annuity contracts.

    Science.gov (United States)

    2010-04-01

    ... under the annuity contract. The actuarial present value of any additional benefits described under this... actuarial present value of any additional benefits provided under an annuity contract described in paragraph... beneficiary under the contract and the actuarial present value of the additional benefits is no more than 120...

  2. 48 CFR 828.106-72 - Contract provision.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract provision. 828... GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds and Other Financial Protections 828.106-72 Contract provision. Insert 852.228-72, Assisting Service-Disabled Veteran-Owned and Veteran-Owned Small...

  3. 48 CFR 232.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 232.102 Section 232.102 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 232.102 Description of contract financing methods. (e)(2) Progress payments...

  4. 48 CFR 1432.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 1432.102 Section 1432.102 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 1432.102 Description of contract financing methods. Use of progress payments based on a percentage or stage...

  5. 48 CFR 932.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 932.102 Section 932.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 932.102 Description of contract financing methods. (e)(2) Progress payments based on a percentage or stage of...

  6. 48 CFR 432.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 432.102 Section 432.102 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.102 Description of contract financing methods. Progress payments based on a percentage or stage of completion are...

  7. 48 CFR 32.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 32.102 Section 32.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.102 Description of contract financing methods. (a) Advance payments are advances of money by the Government to a...

  8. 48 CFR 227.7102-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract clause. 227.7102..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7102-3 Contract clause. (a)(1) Except as provided in paragraph (b) of this subsection, use the...

  9. Agile Contracts

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2014-01-01

    with “endless” re-negotiation of the requirements; you need a more flexible way to develop IS. A new way of coping with many changes is to use an agile development approach and a fixed budget and resources contract. This paper presents an example case. We analyse the case and design a guideline for how......When you have stable and non-ambiguous requirements then a classic contract for IS between a supplier and a public sector institution based on a requirements specification may be well suited. However, if you have to accept many changes or have ambiguous requirements then you may end up...... to implement a fixed budget and resources contract in the public sector. The guideline includes elements to cope with challenges in a tender process such as transparency, criteria for supplier selection, and live assessment of resource skills and capabilities, as well as achieving the flexibility for change...

  10. 48 CFR 2936.602 - Selection of firms for architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ... architect-engineer contracts. 2936.602 Section 2936.602 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 2936.602 Selection of firms for architect-engineer contracts. ...

  11. 48 CFR 2936.209 - Construction contracts with architect-engineer firms.

    Science.gov (United States)

    2010-10-01

    ... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...

  12. 48 CFR 629.402-1 - Foreign fixed-price contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Foreign fixed-price contracts. 629.402-1 Section 629.402-1 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS TAXES Contract Clauses 629.402-1 Foreign fixed-price contracts. ...

  13. 48 CFR 29.402-2 - Foreign cost-reimbursement contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Foreign cost-reimbursement... GENERAL CONTRACTING REQUIREMENTS TAXES Contract Clauses 29.402-2 Foreign cost-reimbursement contracts. (a) The contracting officer shall insert the clause at 52.229-8, Taxes—Foreign Cost-Reimbursement...

  14. 29 CFR 1977.3 - General requirements of section 11(c) of the Act.

    Science.gov (United States)

    2010-07-01

    ... WILLIAMS-STEIGER OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 General § 1977.3 General requirements of... 29 Labor 9 2010-07-01 2010-07-01 false General requirements of section 11(c) of the Act. 1977.3 Section 1977.3 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH...

  15. The concession contracts assignment: general issues and controversies; A cessao de direitos e obrigacoes no contrado de concessao: aspectos gerais e questoes controversas

    Energy Technology Data Exchange (ETDEWEB)

    Rosa, Renata Gualberto Cordeiro [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Considering the activities of exploration and production of oil and natural gas and the concession regimen applicable to them in Brazil, the assignment of rights and obligations of the concession contract is analyzed from the points of view of the Petroleum Law and the contract itself. This paper intend to address the legal aspects that support the general legal authorization and the rules of the concession contract, as well as the role of ANP in the approval of the transfer and in the development of technical rules, regarding its function as a regulatory agency. Two controversial issues, the transfer with retroactive effects and the transfer of part of the concession area, are analyzed in light of the general features of the transfer of rights and obligations. Finally, the 'cessao de fato' and its consequences will be considered for the study of assignment of rights with retroactive effects and the operations of sole risk.. (author)

  16. Some results on a general iterative method for k-strictly pseudo-contractive mappings

    OpenAIRE

    Jung Jong Soo

    2011-01-01

    Abstract Let H be a Hilbert space, C be a closed convex subset of H such that C ± C ⊂ C, and T : C → H be a k-strictly pseudo-contractive mapping with F(T) ≠ ∅ for some 0 ≤ k < 1. Let F : C → C be a κ-Lipschitzian and η-strongly monotone operator with κ > 0 and η > 0 and f : C → C be a contraction with the contractive constant α ∈ (0, 1). Let , and τ < 1. Let {αn } and {βn } be sequen...

  17. 46 CFR 32.75-5 - Hull requirements; general-TB/ALL.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Hull requirements; general-TB/ALL. 32.75-5 Section 32.75..., AND HULL REQUIREMENTS Hull Requirements for Wood Hull Tank Vessels Constructed Prior to November 10, 1936 § 32.75-5 Hull requirements; general—TB/ALL. The scantlings, material, and workmanship, and the...

  18. 46 CFR 32.70-5 - Hull requirements; general-TB/ALL.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Hull requirements; general-TB/ALL. 32.70-5 Section 32.70..., AND HULL REQUIREMENTS Hull Requirements for Steel Hull Tank Vessels Constructed Prior to November 10, 1936 § 32.70-5 Hull requirements; general—TB/ALL. The scantlings, material, and workmanship, the...

  19. General review of quality assurance system requirements. The utility or customer requirement

    International Nuclear Information System (INIS)

    Fowler, J.L.

    1976-01-01

    What are the customer's Quality Assurance requirements and how does he convey these to his contractor, or apply them to himself. Many documents have been prepared mostly by countries with high technology availability and it is significant to note that many of the documents, particularly those of the United States of America, were prepared for nuclear safety related plant, but the logic of these documents equally applied to heavy engineering projects that are cost effective, and this is the current thinking and practice within the CEGB (Central Electricity Generating Board). Some documents have legislative backing, others rely on contractual disciplines, but they all appear to repeat the same basic requirements, so why does one continue to write more documents. The basic problem is that customers have to satisfy differing national legislative, economic and commercial requirements and, like all discerning customers, wish to reserve the right to satisfy their own needs, which are very often highly specialized. The CEGB are aware of this problem and are actively co-operating with most of the national and international authorities who are leading in this field, with a view to obtaining compatibility of requirements, but now there still remains the problem of satisfying national custom and practice. (author)

  20. 33 CFR 155.4045 - Required agreements or contracts with the salvage and marine firefighting resource providers.

    Science.gov (United States)

    2010-07-01

    ... with the salvage and marine firefighting resource providers. 155.4045 Section 155.4045 Navigation and... agreements or contracts with the salvage and marine firefighting resource providers. (a) You may only list resource providers in your plan that have been arranged by contract or other approved means. (b) You must...

  1. 13 CFR 126.616 - What requirements must a joint venture satisfy to submit an offer on a HUBZone contract?

    Science.gov (United States)

    2010-01-01

    ... procurement having a revenue-based size standard, the procurement exceeds half the size standard corresponding to the NAICS code assigned to the contract; and (ii) For a procurement having an employee-based size... for the purpose of submitting an offer for a HUBZone contract. The joint venture itself need not be...

  2. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  3. 30 CFR 57.13001 - General requirements for boilers and pressure vessels.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false General requirements for boilers and pressure... NONMETAL MINES Compressed Air and Boilers § 57.13001 General requirements for boilers and pressure vessels. All boilers and pressure vessels shall be constructed, installed, and maintained in accordance with...

  4. 30 CFR 56.13001 - General requirements for boilers and pressure vessels.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false General requirements for boilers and pressure... MINES Compressed Air and Boilers § 56.13001 General requirements for boilers and pressure vessels. All boilers and pressure vessels shall be constructed, installed, and maintained in accordance with the...

  5. 40 CFR 60.4120 - General Hg budget trading program permit requirements.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false General Hg budget trading program... and Compliance Times for Coal-Fired Electric Steam Generating Units Permits § 60.4120 General Hg budget trading program permit requirements. (a) For each Hg Budget source required to have a title V...

  6. 9 CFR 113.300 - General requirements for live virus vaccines.

    Science.gov (United States)

    2010-01-01

    ... vaccines. 113.300 Section 113.300 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE... REQUIREMENTS Live Virus Vaccines § 113.300 General requirements for live virus vaccines. When prescribed in an applicable Standard Requirement or in the filed Outline of Production, a live virus vaccine shall meet the...

  7. 9 CFR 113.64 - General requirements for live bacterial vaccines.

    Science.gov (United States)

    2010-01-01

    ... bacterial vaccines. 113.64 Section 113.64 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION... STANDARD REQUIREMENTS Live Bacterial Vaccines § 113.64 General requirements for live bacterial vaccines... bacterial vaccine shall meet the requirements in this section. (a) Purity test. Final container samples of...

  8. 48 CFR 937.7040 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 937.7040... CONTRACTING SERVICE CONTRACTING Protective Services Contracting 937.7040 Contract clauses. The contracting... services” in all protective services solicitations and contracts involving DOE-owned facilities requiring...

  9. General requirements for pressure-retaining systems and components in CANDU nuclear power plants

    International Nuclear Information System (INIS)

    1991-11-01

    This standard specifies the general requirements for the design, fabrication and installation of pressure-retaining systems, components, and their supports in CANDU nuclear power plants. (16 figs., 2 tabs., 25 refs.)

  10. 30 CFR 816.13 - Casing and sealing of drilled holes: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Casing and sealing of drilled holes: General...-SURFACE MINING ACTIVITIES § 816.13 Casing and sealing of drilled holes: General requirements. Each exploration hole, other drill or borehole, well, or other exposed underground opening shall be cased, sealed...

  11. 40 CFR 267.198 - What are the general operating requirements for my tank systems?

    Science.gov (United States)

    2010-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...

  12. 20 CFR 604.3 - Able and available requirement-general principles.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Able and available requirement-general principles. 604.3 Section 604.3 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF...—general principles. (a) A State may pay UC only to an individual who is able to work and available for...

  13. Vascular endothelin ET(B) receptor-mediated contraction requires phosphorylation of ERK1/2 proteins

    DEFF Research Database (Denmark)

    Luo, Guogang; Jamali, Roya; Cao, Yong-Xiao

    2006-01-01

    In cardiovascular diseases, endothelin type B (ET(B)) receptors in arterial smooth muscle cells are upregulated. The present study revealed that organ culture of rat mesenteric artery segments enhanced endothelin ET(B) receptor-mediated contraction paralleled with increase in the receptor mRNA an...

  14. Teaching Management Information Systems as a General Education Requirement (GER) Capstone

    Science.gov (United States)

    Hoanca, Bogdan

    2012-01-01

    Although many IS programs nationwide use capstone courses in the major, this paper reports on the use of an upper division Management Information Systems (MIS) class as a general education requirements (GER) capstone. The class is a core requirement for all majors in the Bachelor of Business Administration (BBA) program at the University of Alaska…

  15. General requirements to implement the personal dose equivalent Hp(10) in Brazil

    International Nuclear Information System (INIS)

    Lopes, Amanda Gomes; Silva, Francisco Cesar Augusto da

    2017-01-01

    To update the dosimetry quantity with the international community, Brazil is changing the Individual Dose Hx to the Personal Dose Equivalent Hp(10). A bibliographical survey on the technical and administrative requirements of nine countries that use Hp(10) was carried out to obtain the most relevant ones. All of them follow IEC and ISO guidelines for technical requirements, while administrative requirements change from country to country. Based on countries experiences, this paper presents a list of important general requirements to implement Hp(10) and to prepare the Brazilian requirements according to the international scientific community. (author)

  16. General requirements to implement the personal dose equivalent Hp(10) in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, Amanda Gomes; Silva, Francisco Cesar Augusto da, E-mail: amandagl@bolsista.ird.gov.br [Instituto de Radioproteção e Dosimetria (IRD/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2017-07-01

    To update the dosimetry quantity with the international community, Brazil is changing the Individual Dose Hx to the Personal Dose Equivalent Hp(10). A bibliographical survey on the technical and administrative requirements of nine countries that use Hp(10) was carried out to obtain the most relevant ones. All of them follow IEC and ISO guidelines for technical requirements, while administrative requirements change from country to country. Based on countries experiences, this paper presents a list of important general requirements to implement Hp(10) and to prepare the Brazilian requirements according to the international scientific community. (author)

  17. Demand and Signing of General Practitioner Contract Service among the Urban Elderly: A Population-Based Analysis in Zhejiang Province, China

    Directory of Open Access Journals (Sweden)

    Yanrong Zhao

    2017-03-01

    Full Text Available This study aims to examine whether the urban elderly in the Zhejiang Province of China signed contracts with their general practitioner (GP based on their health service needs, and to further identify the determinants of their demand and signing decisions. A community-based cross-sectional study was conducted in 16 community health service (CHS institutions in Zhejiang Province, China. The urban elderly over 60 years of age were enrolled when visiting the sampled CHS. Baseline characteristics were compared between participants using Chi-Square tests for categorical variables. Univariate and multivariable logistic regression analyses were used to identify determinants of the GP contract service demand and signing decisions, respectively. Among the 1440 urban elderly, 56.67% had signed contracts with their GP, and 55.35% had a demand of the GP contract service. The influencing factors of demand were a history of diabetes or cardiovascular disease (OR = 1.33, 95% CI, 1.05–1.68; urban resident basic medical insurance (URBMI vs. urban employee basic medical insurance (UEBMI (OR = 1.96, 95% CI, 1.46–2.61; and middle-income vs. low-income (OR = 0.67, 95% CI, 0.50–0.90 for RMB 1001–3000; OR = 0.59, 95% CI, 0.39–0.90 for RMB 3001–5000. Having a demand for the GP contract service was the strongest determinant of signing decisions (OR = 13.20, 95% CI, 10.09–17.27. Other factors also contributed to these decisions, including gender, caregiver, and income. The urban elderly who had signed contracts with GPs were mainly based on their health care needs. Elderly people with a history of diabetes or cardiovascular disease, as well as those with URBMI, were found to have stronger needs of a GP contract service. It is believed that the high-income elderly should be given equal priority to those of low-income.

  18. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  19. General Fund Enterprise Business System Did Not Provide Required Financial Information

    Science.gov (United States)

    2012-03-26

    Management of the General Fund Enterprise Business System,” January 14, 2008 Army AAA Report No. A-2010-0187- FFM , “General Fund Enterprise Business System...A-2009-0232- FFM , “General Fund Enterprise Business System – Federal Financial Management Improvement Act Compliance, Examination of Releases...1.4.1, 1.4.2, 1.4.3, and 1.4.4 Requirements,” September 30, 2009 AAA Report No. A-2009-0231- FFM , “General Fund Enterprise Business System – Federal

  20. 48 CFR 2032.402 - General.

    Science.gov (United States)

    2010-10-01

    ... Chief Financial Officer, Division of Accounting and Finance, to ensure completeness of contractor... REQUIREMENTS CONTRACT FINANCING Advance Payments for Non-Commercial Items 2032.402 General. (a) The contracting... contract terms concerning advance payments. (b) Before authorizing any advance payment agreements, except...

  1. 48 CFR 2819.7001 - General.

    Science.gov (United States)

    2010-10-01

    ... BUSINESS PROGRAMS Forecasts of Expected Contract Opportunities 2819.7001 General. Section 501 of Public Law 100-656, the Business Opportunity Development Reform Act of 1988, requires executive agencies having... expected contract opportunities, or classes of contract opportunities that small business concerns...

  2. A Comparative Analysis of the Ethos, Role and Function of Implied Obligations in Shipping Law and General Law of Contract

    OpenAIRE

    Ndi, George; Alawneh, Tariq

    2015-01-01

    The law governing the international carriage of goods by sea is deeply rooted in the doctrine of freedom of contract. The historical origins of the shipping industry itself can be traced to the era of 'laissez faire' in which contractual practice, based on negotiated terms and conditions, was free from the regulatory constraints of the state. It is for this reason that to this day modern shipping law is still rooted in the common law and customary trade usages with very limited statutory infl...

  3. 76 FR 4112 - Federal Acquisition Regulation; Submission for OMB Review; Contract Financing

    Science.gov (United States)

    2011-01-24

    ...; Submission for OMB Review; Contract Financing AGENCIES: Department of Defense (DOD), General Services... approved information collection requirement concerning contract financing. A notice was published in the... substantially changed the statutory authorities for Government financing of contracts. Sections 2001(f) and 2051...

  4. Invalidity of contract: legislative regulation and types

    Directory of Open Access Journals (Sweden)

    Василь Іванович Крат

    2017-09-01

    Full Text Available Invalidity contracts always attracted attention researchers. Without regard to it, in modern conditions there is an enormous layer of the problems related to invalidity contract, that to require a doctrine and utilitarian comprehension. The article is sanctified to research invalidity contract. In the article analyses problems of the legislative regulation and types of invalidity contract through the prism of judicial practice. In the Civil code of Ukraine, a voidable contract sets as a common rule. A voidable of the contract is incarnated in the so-called «virtual» invalidity when only the most typical grounds are enumerated. However, even such approach does not allow to overcome all possible cases that arise up in practice. Such situation touches possibility of voidable contracts concluded with the purpose of to shut out the appeal of claim to the property of the debtor. Therefore it follows to set general rules in relation to voidable contracts of the debtor. A nullity of the contract takes place only in the case when there is the direct pointing of law on the qualification of that or another contract as the nullity. The nullity of contract in the Civil code of Ukraine is constructed by means of «textual» invalidity. There are no single attempts to use the construction of «virtual» invalidity in judicial practice when there is the direct pointing of law on the qualification of that or another contract as the nullity, that is impermissible. Methodologically incorrectly to carry out identifying of invalidity contract and obligation with the aim of providing of application of different after the rich in content filling norms.

  5. 48 CFR 1427.304-1 - General.

    Science.gov (United States)

    2010-10-01

    ... Solicitor for the General Law Division shall issue a final determination, after consideration of any further... Section 1427.304-1 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts. 1427.304-1 General. (a)(1...

  6. Fabiola Gianotti (left) and President of CERN Council Agnieszka Zalewska sign Gianotti's contract as the next Director-General of CERN.

    CERN Multimedia

    Brice, Maximilien

    2014-01-01

    Fabiola Gianotti (left) and President of CERN Council Agnieszka Zalewska sign Gianotti's contract as the next Director-General of CERN. Gianotti's five-year mandate will start on 1 January 2016 (Image: Maximilien Brice/CERN) Mme Fabiola Gianotti (à gauche) et la Présidente du Conseil du CERN, Mme Agnieszka Zalewska, signent le contrat de Mme Gianotti, prochaine directrice générale du CERN. Le mandat de cinq ans de Mme Gianotti débutera le 1er janvier 2016 (Image : M Brice)

  7. Technical products for radiation shielding. Shield assembled from lead blocks for radiation protection. General technical requirements

    International Nuclear Information System (INIS)

    1981-01-01

    The object of this standard description is the general technological requirements of 50 and 100 mm thick radiation protection shields assembled from lead blocks. The standard contains the definitions, types, parameters and dimensions of shields, their technical and acceptance criteria with testing methods, tagging, packaging, transportation and storage requirements, producer's liability. Some illustrated assembling examples, preferred parameters and dosimetry methods for shield inspection are given. (R.P.)

  8. Characteristics of nuclear contracts. Pt. 1

    International Nuclear Information System (INIS)

    Blanchard, R.

    1976-01-01

    While the object of nuclear contracts is specific, these contracts are concluded according to proven techniques based on general regulations on contracts. Following a review of contract classification, they are differentiated according to the nature of the co-contracting parties, the purpose of the contract itself, the procedure for drawing up the contracts, and payment. The operations prior to the contract vary in that they may include a call for tenders, an option for delays or a letter of intent. (NEA) [fr

  9. Cytoskeletal Tropomyosin Tm5NM1 Is Required for Normal Excitation–Contraction Coupling in Skeletal Muscle

    OpenAIRE

    Vlahovich, Nicole; Kee, Anthony J.; Van der Poel, Chris; Kettle, Emma; Hernandez-Deviez, Delia; Lucas, Christine; Lynch, Gordon S.; Parton, Robert G.; Gunning, Peter W.; Hardeman, Edna C.

    2009-01-01

    The functional diversity of the actin microfilaments relies in part on the actin binding protein tropomyosin (Tm). The muscle-specific Tms regulate actin-myosin interactions and hence contraction. However, there is less known about the roles of the numerous cytoskeletal isoforms. We have shown previously that a cytoskeletal Tm, Tm5NM1, defines a Z-line adjacent cytoskeleton in skeletal muscle. Recently, we identified a second cytoskeletal Tm in this region, Tm4. Here we show that Tm4 and Tm5N...

  10. Networks and informal contract law

    NARCIS (Netherlands)

    Tjong Tjin Tai, Eric; Brownsword, Roger; van Gestel, Rob A.J.; Micklitz, Hans-W.

    2017-01-01

    It is often argued that formal contract law cannot treat networks correctly. An analysis of networks in an informal contract law system shows that informal contract law is no panacea. Remaining problems require a different approach to legal regulation and contract practice.

  11. 78 FR 72033 - Approval and Promulgation of Implementation Plans; Florida: General Requirements and Gasoline...

    Science.gov (United States)

    2013-12-02

    ...] Approval and Promulgation of Implementation Plans; Florida: General Requirements and Gasoline Vapor Control... Protection (FDEP), related to the State's gasoline vapor recovery program. This correcting amendment corrects... . SUPPLEMENTARY INFORMATION: This action corrects inadvertent errors in a rulemaking related to Florida's gasoline...

  12. Interdisciplinary Science Courses for College General Education Requirements: Perspectives of Faculty at a State University.

    Science.gov (United States)

    Dass, Pradeep Maxwell

    Science educators have been advocating a broader role for science education--that of helping all students see the relevance of science to their own lives. Yet the only experience with post-secondary science that non-science majors get is through a couple of science courses which are part of the general education requirements (GERs) for a liberal…

  13. General requirements for concrete containment structures for CANDU nuclear power plants

    International Nuclear Information System (INIS)

    1993-07-01

    This standard provides the general requirements used in the design, construction, testing, and commissioning of concrete containment structures for CANDU nuclear power plants designated as class containment and is directed to the owners, designers, manufacturers, fabricators, and constructors of the concrete components and parts

  14. 77 FR 54499 - Microorganisms; General Exemptions From Reporting Requirements; Revisions to Recipient Organisms...

    Science.gov (United States)

    2012-09-05

    ... within 1 month. Survival was longer for a genetically modified B. amyloliquefaciens strain on leaf... Microorganisms; General Exemptions From Reporting Requirements; Revisions to Recipient Organisms Eligible for... manufacturer must use one of the recipient organisms listed in Sec. 725.420, and must implement specific...

  15. 29 CFR 4.172 - Meeting requirements for particular fringe benefits-in general.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Meeting requirements for particular fringe benefits-in... particular fringe benefits—in general. Where a fringe benefit determination specifies the amount of the..., as such costs are properly a business expense of the employer. If prevailing fringe benefits for...

  16. 26 CFR 1.25A-1 - Calculation of education tax credit and general eligibility requirements.

    Science.gov (United States)

    2010-04-01

    ... Scholarship Credit is claimed may not be taken into account in computing the amount of the Lifetime Learning... tax credit and general eligibility requirements. (a) Amount of education tax credit. An individual... Scholarship Credit (as described in § 1.25A-3) plus the Lifetime Learning Credit (as described in § 1.25A-4...

  17. 34 CFR 350.10 - What are the general requirements for Disability and Rehabilitation Research Projects?

    Science.gov (United States)

    2010-07-01

    ... more of the following types of activities, as specified in §§ 350.13-350.19: (1) Research. (2... 34 Education 2 2010-07-01 2010-07-01 false What are the general requirements for Disability and Rehabilitation Research Projects? 350.10 Section 350.10 Education Regulations of the Offices of the Department of...

  18. 42 CFR 84.99 - Man tests; testing conditions; general requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Man tests; testing conditions; general requirements. 84.99 Section 84.99 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self-Contained Breathing Apparatus § 84.99...

  19. 40 CFR 1033.201 - General requirements for obtaining a certificate of conformity.

    Science.gov (United States)

    2010-07-01

    ... certificate of conformity. 1033.201 Section 1033.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY....201 General requirements for obtaining a certificate of conformity. Certification is the process by... certificate of conformity for freshly manufactured locomotives. Anyone meeting the definition of...

  20. 40-Hz square-wave stimulation requires less energy to produce muscle contraction: compared with the TASER® X26 conducted energy weapon.

    Science.gov (United States)

    Comeaux, James A; Jauchem, James R; Cox, D Duane; Crane, Carrie C; D'Andrea, John A

    2013-07-01

    Conducted energy weapons (CEWs) (including the Advanced TASER(®) X26 model produced by TASER International, Inc.) incapacitate individuals by causing muscle contractions. In this study using anesthetized swine, the potential incapacitating effect of primarily monophasic, 19-Hz voltage imposed by the commercial CEW was compared with the effect of voltages imposed by a laboratory device that created 40-Hz square waves. Forces of muscle contraction were measured with the use of strain gauges. Stimulation with 40-Hz square waves required less pulse energy than stimulation with the commercial CEW to produce similar muscle contraction. The square-pulse stimulation, at the higher repetition rate, caused a more complete tetanus at a lower energy. Use of such a simple shape of waveform may be used to make future nonlethal weapon devices more efficient. © 2013 American Academy of Forensic Sciences Published 2013. This article is a U.S. Government work and is in the public domain in the U.S.A.

  1. Generalized Information Architecture for Managing Requirements in IBM?s Rational DOORS(r) Application.

    Energy Technology Data Exchange (ETDEWEB)

    Aragon, Kathryn M.; Eaton, Shelley M.; McCornack, Marjorie Turner; Shannon, Sharon A.

    2014-12-01

    When a requirements engineering effort fails to meet expectations, often times the requirements management tool is blamed. Working with numerous project teams at Sandia National Laboratories over the last fifteen years has shown us that the tool is rarely the culprit; usually it is the lack of a viable information architecture with well- designed processes to support requirements engineering. This document illustrates design concepts with rationale, as well as a proven information architecture to structure and manage information in support of requirements engineering activities for any size or type of project. This generalized information architecture is specific to IBM's Rational DOORS (Dynamic Object Oriented Requirements System) software application, which is the requirements management tool in Sandia's CEE (Common Engineering Environment). This generalized information architecture can be used as presented or as a foundation for designing a tailored information architecture for project-specific needs. It may also be tailored for another software tool. Version 1.0 4 November 201

  2. Conceptual design of disposal facility below the generally used depth. Document prepared by other institute, based on the trust contract

    Energy Technology Data Exchange (ETDEWEB)

    Kobayashi, Wataru; Nakagawa, Tatsuo; Mukunoki, Atsushi; Goto, Kikuji [JGC Corp., Tokyo (Japan)

    2002-02-01

    Radioisotope, nuclear fuel materials, and so on have been used in the various fields such as the research activities of universities and research institutes or the treatment and diagnosis of the medical institutes. It is necessary to treat and dispose of radioactive wastes safety and economically. However, as for radioactive wastes disposal below the generally used depth, a concrete disposal concept isn't examined, and the safety of disposal isn't evaluated, either. This report contains building of the database for the radioactive wastes applicable for disposal below the generally used depth, and preliminary safety evaluation was enforced on the setup of condition presumed in the present. Finally subjects for the conceptual design of the disposal facility below the generally used depth were extracted. (author)

  3. Utility Energy Services Contracts Guide

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    The UESC Guide is a compilation of samples and templates developed as a resource to help contracting officers implement task orders for UESCs under existing U.S. General Services Administration areawide contracts.

  4. Development of CSA N1600-14: general requirements for nuclear emergency management programs

    Energy Technology Data Exchange (ETDEWEB)

    Sellar, C. [Canadian Standards Association Group, Mississauga, ON (Canada); Coles, J. [Ontario Power Generation, Darlington, ON (Canada)

    2014-07-01

    CSA Group has published a new standard on General requirements for nuclear emergency management programs (CSA N1600-14). The standard establishes criteria for the emergency management programs of on- and off-site organizations to address nuclear emergencies at Canadian nuclear power plants (NPPs). It provides the requirements to develop, implement, evaluate, maintain, and continuously improve a nuclear emergency management program for prevention and mitigation, preparedness, response, and recovery from a nuclear emergency at a NPP. This paper discusses the development of the standard, and provides the key drivers, structure, scope, and outline of the standard, while highlighting key features, impacts, and benefits. (author)

  5. Generalized requirements and decompositions for the design of test parts for micro additive manufacturing research

    DEFF Research Database (Denmark)

    Thompson, Mary Kathryn; Clemmensen, Line Katrine Harder

    2015-01-01

    The design of experimental test parts to characterize micro additive manufacturing (AM) processes is challenging due to the influence of the manufacturing and metrology processes. This work builds on the lessons learned from a case study in the literature to derive generalized requirements and high...... level decompositions for the design of test parts and the design of experiments to characterize micro additive manufacturing processes. While the test parts and the experiments described are still work in progress, the generic requirements derived from them can serve as a starting point for the design...... of other micro additive manufacturing related studies and their decompositions can help structure future work....

  6. Office of Inspector General report on audit of the Western Area Power Administration`s contract with Basin Electric Power Cooperative

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-25

    At the request of the Western Area Power Administration (Western), an audit of 17 areas was conducted with respect to possible overcharges on a power contract between Western and Basin Electric Power Cooperative (Basin), Contract No. DE-MP65-82WP-19001. The contract for Western`s purchase of electric power from Basin was entered into on April 15, 1982, and was in effect from January 1, 1986, through October 31, 1990. During this 58-month period, Basin billed Western approximately $197.6 million. Overall, it was found that Basin overcharged Western approximately $23.8 million. These overcharges occurred because Basin: (1) did not recognize or amortize as gain its overestimate of completion and correction costs for Antelope Valley Station (AVS) Unit 2; (2) did not amortize the gain on the sale/leaseback of AVS Unit 2 as an offset to lease costs; (3) billed Western prematurely for lease and interest costs; (4) overcharged for the cost of coal by including administrative and general expenses and profit, as well as incorrectly calculating discounts, royalty payments, and imputed interest costs; (5) made faulty calculations of amortization rates for deferred costs; (6) used a shorter depreciation period for AVS common facilities than it had used for other power plants; (7) retained tax benefit transfers; and (8) charged Western for interest and depreciation that had been paid by others. In addition to the $23.8 million in overcharges, interest accrued on the overcharges through December 31, 1996 was estimated to be approximately $22.1 million, resulting in a total of $45.9 million due Western.

  7. The detailed balance requirement and general empirical formalisms for continuum absorption

    Science.gov (United States)

    Ma, Q.; Tipping, R. H.

    1994-01-01

    Two general empirical formalisms are presented for the spectral density which take into account the deviations from the Lorentz line shape in the wing regions of resonance lines. These formalisms satisfy the detailed balance requirement. Empirical line shape functions, which are essential to provide the continuum absorption at different temperatures in various frequency regions for atmospheric transmission codes, can be obtained by fitting to experimental data.

  8. Identifying the nontechnical skills required of nurses in general surgical wards.

    Science.gov (United States)

    Marshall, Dianne C; Finlayson, Mary P

    2018-04-01

    To identify the nontechnical skills (NTS) required of nurses in general surgical wards for safe and effective care. As the largest occupational group, nurses are in an ideal position to block the vulnerabilities of patient adverse events in a surgical ward. Previous studies in the surgical environment have identified the NTS required of nurses for safe care in operating rooms; however, these skills have not been identified for nurses in general surgical wards. A nonparticipant observational descriptive design was used. A purposive sample of 15 registered nurses was recruited from four surgical wards and observed for a full shift on a morning, afternoon or night shift. Nonparticipant observations were conducted using field notes to collect data. A coding frame was developed, and an inductive process was used to analyse the data. A taxonomy comprising seven NTS required of nurses in their roles in surgical ward teams emerged from the data analysis. They are communication, leadership and management, planning, decision-making, situation awareness, teamwork and patient advocacy. Patient care provided by general surgical nurses involved the seven identified key NTS. These particular NTS are an important component of safe nursing practice as they underpin the provision of safe and effective care for general surgical patients. Nurses block the trajectory of error by using NTS to address the vulnerabilities in the system that can lead to adverse patient events. Identifying general surgical nurses' NTS enables the development of teaching strategies that target the learning of those skills to achieve successful work outcomes and improve patient safety. © 2018 John Wiley & Sons Ltd.

  9. Generic functional requirements for a NASA general-purpose data base management system

    Science.gov (United States)

    Lohman, G. M.

    1981-01-01

    Generic functional requirements for a general-purpose, multi-mission data base management system (DBMS) for application to remotely sensed scientific data bases are detailed. The motivation for utilizing DBMS technology in this environment is explained. The major requirements include: (1) a DBMS for scientific observational data; (2) a multi-mission capability; (3) user-friendly; (4) extensive and integrated information about data; (5) robust languages for defining data structures and formats; (6) scientific data types and structures; (7) flexible physical access mechanisms; (8) ways of representing spatial relationships; (9) a high level nonprocedural interactive query and data manipulation language; (10) data base maintenance utilities; (11) high rate input/output and large data volume storage; and adaptability to a distributed data base and/or data base machine configuration. Detailed functions are specified in a top-down hierarchic fashion. Implementation, performance, and support requirements are also given.

  10. General construction requirements for the deep repository in the KBS-3 system

    International Nuclear Information System (INIS)

    2002-10-01

    The KBS-3 systems includes equipment and plants for transport of spent nuclear fuels and encapsulated spent fuels, central intermediate storage, encapsulation and deep geologic disposal. The requirements in this document concern the repository and have been put together in view of the tasks of designing, constructing and building the repository. The report presents: A general review of existing design plans; Laws and regulations relevant for the design of the repository; How the regulations have been broken down to functional demands and dimensioning requirements for the repository; How the site conditions influence the design, and how the layout of the different parts of the repository interact; Relations between the functions of the repository, the safety and the design; A foundation for developing construction plans for the repository. The requirements will be collected in a database that will develop as new knowledge is collected

  11. 10 CFR 503.8 - No alternate power supply-general requirement for certain exemptions for new powerplants.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false No alternate power supply-general requirement for certain exemptions for new powerplants. 503.8 Section 503.8 Energy DEPARTMENT OF ENERGY (CONTINUED) ALTERNATE FUELS NEW FACILITIES General Requirements for Exemptions § 503.8 No alternate power supply—general...

  12. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  13. Contracting for Public Services

    DEFF Research Database (Denmark)

    Greve, Carsten

    strategic purchasing understanding markets communicating the contracting decision designing and drafting the contract the role of the consumer the regulation of service provision Illustrated throughout with practitioner case-studies from a range of OECD countries, this book presents an important new......Insightful and comprehensive and covering new subjects like globalization and IT, this text, international in its approach, provides a thorough introduction to the key phases of the contracting process and the skills required by managers in its implementation. These include: policy for contracting...

  14. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  15. 77 FR 3288 - International Mail Contract

    Science.gov (United States)

    2012-01-23

    ... as the baseline contract for future functional equivalence analyses of the GREP Contracts 1 product... Classification Schedule language for GREP Contracts 1. The Postal Service identifies general contract terms that... methodology, the relevant characteristics of this GREP contract are similar, if not the same, as the relevant...

  16. General Approaches and Requirements on Safety and Security of Radioactive Materials Transport in Russian Federation

    International Nuclear Information System (INIS)

    Ershov, V.N.; Buchel'nikov, A.E.; Komarov, S.V.

    2016-01-01

    Development and implementation of safety and security requirements for transport of radioactive materials in the Russian Federation are addressed. At the outset it is worth noting that the transport safety requirements implemented are in full accordance with the IAEA's ''Regulations for the Safe Transport of Radioactive Material (2009 Edition)''. However, with respect to security requirements for radioactive material transport in some cases the Russian Federation requirements for nuclear material are more stringent compared to IAEA recommendations. The fundamental principles of safety and security of RM managements, recommended by IAEA documents (publications No. SF-1 and GOV/41/2001) are compared. Its correlation and differences concerning transport matters, the current level and the possibility of harmonization are analysed. In addition a reflection of the general approaches and concrete transport requirements is being evaluated. Problems of compliance assessment, including administrative and state control problems for safety and security provided at internal and international shipments are considered and compared. (author)

  17. DOD Service Acquisition: Improved Use of Available Data Needed to Better Manage and Forecast Service Contract Requirements

    Science.gov (United States)

    2016-02-01

    Requirements Report to Congressional Committees February 2016 GAO-16-119 United States Government Accountability Office United States...Government Accountability Office Highlights of GAO-16-119, a report to congressional committees February 2016 DOD SERVICE ACQUISITION Improved...attention on government operations that it identifies as high risk due to their greater vulnerabilities to fraud , waste, abuse, and mismanagement or

  18. 48 CFR 52.222-53 - Exemption from Application of the Service Contract Act to Contracts for Certain Services...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Certain Services-Requirements. 52.222-53 Section 52.222... from Application of the Service Contract Act to Contracts for Certain Services—Requirements. As... Act to Contracts for Certain Services—Requirements (FEB 2009) (a) The services under this contract are...

  19. AMPK alpha1 activation is required for stimulation of glucose uptake by twitch contraction, but not by H2O2, in mouse skeletal muscle

    DEFF Research Database (Denmark)

    Jensen, Thomas Elbenhardt; Schjerling, Peter; Viollet, Benoit

    2008-01-01

    into muscle by certain stimuli. In contrast, no clear function has yet been determined for alpha(1) AMPK in skeletal muscle, possibly due to alpha-AMPK isoform signaling redundancy. By applying low-intensity twitch-contraction and H(2)O(2) stimulation to activate alpha(1) AMPK, but not alpha(2) AMPK......, in wildtype and alpha-AMPK transgenic mouse muscles, this study aimed to define conditions where alpha(1) AMPK is required to increase muscle glucose uptake. METHODOLOGY/PRINCIPAL FINDINGS: Following stimulation with H(2)O(2) (3 mM, 20 min) or twitch-contraction (0.1 ms pulse, 2 Hz, 2 min), signaling and 2......-deoxyglucose uptake were measured in incubated soleus muscles from wildtype and muscle-specific kinase-dead AMPK (KD), alpha(1) AMPK knockout or alpha(2) AMPK knockout mice. H(2)O(2) increased the activity of both alpha(1) and alpha(2) AMPK in addition to Akt phosphorylation, and H(2)O(2)-stimulated glucose...

  20. Extracellular cell wall β(1,3)glucan is required to couple septation to actomyosin ring contraction

    Science.gov (United States)

    Muñoz, Javier; Cortés, Juan Carlos G.; Sipiczki, Matthias; Ramos, Mariona; Clemente-Ramos, José Angel; Moreno, M. Belén; Martins, Ivone M.; Pérez, Pilar

    2013-01-01

    Cytokinesis has been extensively studied in different models, but the role of the extracellular cell wall is less understood. Here we studied this process in fission yeast. The essential protein Bgs4 synthesizes the main cell wall β(1,3)glucan. We show that Bgs4-derived β(1,3)glucan is required for correct and stable actomyosin ring positioning in the cell middle, before the start of septum formation and anchorage to the cell wall. Consequently, β(1,3)glucan loss generated ring sliding, oblique positioned rings and septa, misdirected septum synthesis indicative of relaxed rings, and uncoupling between a fast ring and membrane ingression and slow septum synthesis, suggesting that cytokinesis can progress with defective septum pushing and/or ring pulling forces. Moreover, Bgs4-derived β(1,3)glucan is essential for secondary septum formation and correct primary septum completion. Therefore, our results show that extracellular β(1,3)glucan is required for cytokinesis to connect the cell wall with the plasma membrane and for contractile ring function, as proposed for the equivalent extracellular matrix in animal cells. PMID:24165938

  1. Conditions of contract for construction for building and engineering works designed by the employer : general conditions : guidance for the preparation of particular conditions forms of letter of tender, contract agreement and dispute adjudication agreement

    CERN Document Server

    1999-01-01

    Conditions of Contract for Construction, which are recommended for building or engineering works designed by the Employer or by his representative, the Engineer. Under the usual arrangements for this type of contract, the Contractor constructs the works in accordance with a design provided by the Employer. However, the works may include some elements of Contractor-designed civil, mechanical, electrical and/or construction works.

  2. Employee contract issues for dermatologists.

    Science.gov (United States)

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.

  3. Mission reliability of semi-Markov systems under generalized operational time requirements

    International Nuclear Information System (INIS)

    Wu, Xiaoyue; Hillston, Jane

    2015-01-01

    Mission reliability of a system depends on specific criteria for mission success. To evaluate the mission reliability of some mission systems that do not need to work normally for the whole mission time, two types of mission reliability for such systems are studied. The first type corresponds to the mission requirement that the system must remain operational continuously for a minimum time within the given mission time interval, while the second corresponds to the mission requirement that the total operational time of the system within the mission time window must be greater than a given value. Based on Markov renewal properties, matrix integral equations are derived for semi-Markov systems. Numerical algorithms and a simulation procedure are provided for both types of mission reliability. Two examples are used for illustration purposes. One is a one-unit repairable Markov system, and the other is a cold standby semi-Markov system consisting of two components. By the proposed approaches, the mission reliability of systems with time redundancy can be more precisely estimated to avoid possible unnecessary redundancy of system resources. - Highlights: • Two types of mission reliability under generalized requirements are defined. • Equations for both types of reliability are derived for semi-Markov systems. • Numerical methods are given for solving both types of reliability. • Simulation procedure is given for estimating both types of reliability. • Verification of the numerical methods is given by the results of simulation

  4. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  5. An investigation into dental digital radiography in dental practices in West Kent following the introduction of the 2006 NHS General Dental Services contract.

    Science.gov (United States)

    Mauthe, Peter W; Eaton, Kenneth A

    2011-04-01

    The primary aims of the study were to investigate the use of digital radiography within primary dental care practices in the West Kent Primary Care Trust (PCT) area and general dental practitioners' (GDPs) self-reported change in radiographic prescribing patterns following the introduction of the nGDS contract in 2006. Data were gathered via a piloted, self-completed questionnaire, and circulated to all GDPs listed on the National Health Service (NHS) Choices website as practising in the West Kent PCT area. There were three mailings and follow-up telephone calls. The resulting data were entered into a statistical software database and, where relevant, statistically tested, using the chi-square test and Pearson correlation coefficient. Of 223 GDPs, 168 (75%) responded. There were 163 usable questionnaires. The respondents represented 85% of the general dental practices in West Kent. Eighty (49%) respondents were using digital intra-oral radiography. Of those who used digital radiography, 44 (55%) reported that they used phosphor plate systems and 36 (45%) that they used direct digital sensors. Eighty-three (51%) had a panoramic machine in their practice, 46 of whom (55%) were using digital systems; of these, 32 (67%) were using a direct digital system. Seventy-one GDPs reported that they worked exclusively or mainly in private practice. Forty (56%) of these 'mainly private' GDPs reported that they used digital radiographic systems, whereas only 40 (44%) of the 89 'mainly NHS' GDPs reported using digital radio-graphic systems. On average, mainly private GDPs made the transition to a digital radiographic system six months before mainly NHS GDPs. Of those who provided NHS dentistry before and after April 2006, only 18 (14%) reported taking fewer radiographs and seven (6%) taking more. In February 2010, of the West Kent GDPs who responded to the questionnaire, just under 50% used digital radio graphy. Mainly private GDPs were more likely to use digital radiography than

  6. 48 CFR 873.109 - General requirements for acquisition of health-care resources.

    Science.gov (United States)

    2010-10-01

    ..., of the basis for the contract award decision. (38 U.S.C. 8153) (d) Time for receipt of quotations or... quotations or proposals in requests for quotations (RFQs) and solicitations. (2) Without regard to FAR 15.208 or 52.212-1(f), quotations or proposals received after the time set forth in an RFQ or request for...

  7. 28 CFR 51.10 - Requirement of action for declaratory judgment or submission to the Attorney General.

    Science.gov (United States)

    2010-07-01

    ... judgment or submission to the Attorney General. 51.10 Section 51.10 Judicial Administration DEPARTMENT OF... Attorney General. Section 5 requires that, prior to enforcement of any change affecting voting, the... will not be the effect of the change or (b) Make to the Attorney General a proper submission of the...

  8. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  9. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  10. Development and perspectives of principles of european insurance contract law

    Directory of Open Access Journals (Sweden)

    Ana Keglević

    2013-01-01

    Full Text Available Summary: Principles of European Insurance Contract Law (PEICL provides for a set of principles, definitions and model rules exclusively addressing general law for insurance contract. This work has been preformed within greater project for the creation of Common frame of reference on European contract law initiated by the Commission in 2003. PEICL is essentially designed to perform two basic functions. It would improve the quality of the EU acquis in the area of contract law, remove differences and achieve higher degree of divergences between contract laws of the Member states, and even help the national legislators when enacting legislation or Courts with the possible interpretation of the acquis. On the other hand PEICL could be adopted as an optional instrument, thus offering the common platform for contracting in the area of insurance law on the EU level. Possible Optional instrument would exist parallel with, rather instead of, national insurance contract laws. European Parliament resolution of 2011 on policy options for progress towards a European Contract Law for consumers and businesses and corresponding Green Paper of 2010 show positive tendency towards optional instrument in the legal form of Regulation. This would suit the requirements of the insurance sector. However, there are numerous signals showing adversely. For that reason this paper analyses the development and the status of Principles of European Insurance Contract Law particularly the status and perspectives of Principles within the project for the creation of European contract law.

  11. Manual on radiation protection in hospitals and general practice. Basic protection requirements

    International Nuclear Information System (INIS)

    Braestrup, C.B.; Vikterloef, K.J.

    1974-01-01

    The manual as a whole deals with the radiation protection of patients, occupationally exposed persons, and the public. Volume 1, on basic protection requirements, is a general review common to all medical applications of ionizing radiation and radionuclides. Radiation protection is required for patients and staff, and with regard to medical research and chemical trials of new methods; radiation equipment and operating procedures are discussed in connection with diagnostic x-ray installations, x-ray beam therapy, gamma-ray installations for teletherapy, brachytherapy, unsealed sources for therapeutic use, and the diagnostic use of unsealed sources in nuclear medicine. In planning of radiation facilities, attention is paid to levels at which medical care is given, the centralization and decentralization of radiation facilities, diagnostic x-ray facilities and therapy facilities, and nuclear medicine and therapy with unsealed sources. Shielding design is discussed applicable to diagnostic radiology, radiotherapy, nuclear medicine and the therapeutic use of radionuclides. Assignment of responsibilities, legal responsibilities, safety checks, refresher courses and symposia are discussed in the context of organizing radiation protection. Radiation surveys are necessary, and such surveys are described for x-ray and gamma-ray beams, sealed radioactive sources and nuclear medicine. A whole section is devoted to personnel monitoring and health surveillance. An annex gives a list of commonly used radionuclides, another deals with the design of protective shielding

  12. Layer specific and general requirements for ERK/MAPK signaling in the developing neocortex

    Science.gov (United States)

    Xing, Lei; Larsen, Rylan S; Bjorklund, George Reed; Li, Xiaoyan; Wu, Yaohong; Philpot, Benjamin D; Snider, William D; Newbern, Jason M

    2016-01-01

    Aberrant signaling through the Raf/MEK/ERK (ERK/MAPK) pathway causes pathology in a family of neurodevelopmental disorders known as 'RASopathies' and is implicated in autism pathogenesis. Here, we have determined the functions of ERK/MAPK signaling in developing neocortical excitatory neurons. Our data reveal a critical requirement for ERK/MAPK signaling in the morphological development and survival of large Ctip2+ neurons in layer 5. Loss of Map2k1/2 (Mek1/2) led to deficits in corticospinal tract formation and subsequent corticospinal neuron apoptosis. ERK/MAPK hyperactivation also led to reduced corticospinal axon elongation, but was associated with enhanced arborization. ERK/MAPK signaling was dispensable for axonal outgrowth of layer 2/3 callosal neurons. However, Map2k1/2 deletion led to reduced expression of Arc and enhanced intrinsic excitability in both layers 2/3 and 5, in addition to imbalanced synaptic excitation and inhibition. These data demonstrate selective requirements for ERK/MAPK signaling in layer 5 circuit development and general effects on cortical pyramidal neuron excitability. DOI: http://dx.doi.org/10.7554/eLife.11123.001 PMID:26848828

  13. Certain Legal Aspects of the Himalaya Clause in the Contract of International Carriage of Goods by Sea A critical perspective on legal challenges raised by the clause under international uniform law and general contract law principles

    OpenAIRE

    Blaskovic, Igor

    2013-01-01

    Description of the Himalaya clause and its benefits; considerations on benefits for third parties over international uniform law; observations on construction of the clause under the model of the contract for the benefit of a third party; remarks on circular indemnity clauses; application of rules of exclusion of liability to Himalaya clause; conclusion.

  14. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  15. 36 CFR 1212.115 - Does this part affect the Federal contracts that I receive?

    Science.gov (United States)

    2010-07-01

    ... ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage § 1212.115 Does this part affect the Federal contracts that I...

  16. 28 CFR 65.83 - Assistance required by the Attorney General.

    Science.gov (United States)

    2010-07-01

    ... General. The Attorney General may request assistance from a State or local government in the... of INS, who shall, in turn, certify to the Attorney General, that the number of asylum applications... for asylum in the district. (b) The Attorney General determines that there exist circumstances...

  17. Pressure drop in contraction flow

    DEFF Research Database (Denmark)

    Rasmussen, Henrik Koblitz

    This note is a supplement to Dynamic of Polymeric Liquids (DPL) page 178. DPL gives an equation for the pressure drop in a tapered (and circular) contraction, valid only at low angles. Here the general definition of contraction flow (the Bagley correction) and a more general method to find...

  18. Optimal Lease Contract for Remanufactured Equipment

    Science.gov (United States)

    Iskandar, B. P.; Wangsaputra, R.; Pasaribu, U. S.; Husniah, H.

    2018-03-01

    In the last two decades, the business of lease products (or equipment) has grown significantly, and many companies acquire equipment through leasing. In this paper, we propose a new lease contract under which a product (or equipment) is leased for a period of time with maximum usage per period (e.g. 1 year). This lease contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the customer (as a lessee) will be charged an additional cost. In general, the lessor (OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. It is considered that the lessor offers the lease contract for a remanufactured product. We presume that the price of the lease contract for the remanufactured product is much lower than that of a new one, and hence it would be a more attractive option to the customer. The decision problem for the lessee is to select the best option offered that fits to its requirement, and the decision problem for the lessor is find the optimal maintenance efforts for a given price of the lease option offered. We first find the optimal decisions independently for each party, and then the joint optimal decisions for both parties.

  19. 48 CFR 32.402 - General.

    Science.gov (United States)

    2010-10-01

    ... adequate security; (ii) The advance payments will not exceed the unpaid contract price (see 32.410(b... REQUIREMENTS CONTRACT FINANCING Advance Payments for Non-Commercial Items 32.402 General. (a) A limitation on authority to grant advance payments under Pub. L. 85-804 (50 U.S.C. 1431-1435) is described at 50.102-3(b)(4...

  20. General technical requirements (GTR) for inventory monitoring systems (IMS) for the trilateral initiative

    International Nuclear Information System (INIS)

    Pshakin, Gennady M.; Kuleshov, I.; Shea, T.; Puckett, J.M.; Zhukov, I.; Mangan, Dennis L.; Matter, John C.; Waddoups, I.; Smathers, D.; Abhold, M.E.; Hsue, S.-T.; Chiaro, P.

    2002-01-01

    Pursuant to the Trilateral Initiative, the three parties (The Russian Federation, the United States, and the International Atomic Energy Agency) have been engaged in discussions concerning the structure of reliable monitoring systems for storage facilities having large inventories. The intent of these monitoring systems is to provide the capability for the IAEA to maintain continuity of knowledge in a sufficiently reliable manner that should there be equipment failure, loss of continuity of knowledge would be restricted to a small population of the inventory, and thus reinventory of the stored items would be minimized These facility-specific monitoring systems, referred to as Inventory Monitoring Systems (IMS) are to provide the principal means for the M A to assure that the containers of fissile material remain accounted under the Verification Agreements which are to be concluded between the IAEA and the Russian Federation and the lAEA and the United States for the verification of weapon-origin and other fissile material specified by each State as released from its defense programs. A technical experts working group for inventory monitoring systems has been meeting since Feb- of 2000 to formulate General Technical Requirements (GTR) for Inventory Monitoring Systems for the Trilateral Initiative. Although provisional agreement has been reached by the three parties concerning the GTR, it is considered a living document that can be updated as warranted by the three parties. This paper provides a summary of the GTR as it currently exists.

  1. 48 CFR 745.106 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 745.106 Section 745.106 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 745.106 Contract clauses. (a) The contracting officer shall insert the...

  2. ENFORCEMENT OF MORTGAGE CONTRACT

    Directory of Open Access Journals (Sweden)

    Alisa A. BELU

    2016-07-01

    Full Text Available A chattel mortgage contract is the expression of a real guarantee that gives the creditor precedence over other creditors, in addition to the general pledge upon the belongings of the debtor. It refers to the sale of mortgaged movable assets, exclusively or prioritized in favor of the mortgaging creditor, in case the debtor does not comply with his / her commitments, under the signed mortgage contract. Beginning from this purpose, shared by both sides (as the chattel mortgage contract is synallagmatic, in case the debtor is unable to fulfill his / her commitments, the sides reach a situation of enforcement of the signed chattel mortgage contract. Given the legal status of the chattel mortgage contract [Art. 2387-2477 Noul Cod Civil , Universul Juridic, Bucureşti, 2016, ISBN 978-606-673-792-0], the principle of binding force of the contract and the principle according to which signed legal conventions will entail legal effects, the Romanian law maker developed the proper legal framework for the enforcement of the chattel mortgage contract. [art. 622 si urm. Noul Cod de Procedură Civilă, ed. Hamangiu, Bucureşti, 2016, ISBN 978-606-27-0459-9].

  3. Analysis of General Accounting Office, Armed Services Board of Contract Appeals and Federal Court of Claims Decisions on Protests Disputes Involving Performance Specifications

    National Research Council Canada - National Science Library

    Murphy-Sweet, Philip

    2002-01-01

    ... contract. As compared with Design Specifications, which tell the contractor exactly the processes and materials that must be used to accomplish the task, Performance Specifications only specify the final...

  4. Safety Assessment for Facilities and Activities. General Safety Requirements. Pt. 4

    International Nuclear Information System (INIS)

    2009-01-01

    The Safety Fundamentals publication, Fundamental Safety Principles, establishes principles for ensuring the protection of workers, the public and the environment, now and in the future, from harmful effects of ionizing radiation. The objective of this Safety Requirements publication is to establish the generally applicable requirements to be fulfilled in safety assessment for facilities and activities, with special attention paid to defence in depth, quantitative analyses and the application of a graded approach to the ranges of facilities and of activities that are addressed. The publication also addresses the independent verification of the safety assessment that needs to be carried out by the originators and users of the safety assessment. This publication is intended to provide a consistent and coherent basis for safety assessment across all facilities and activities, which will facilitate the transfer of good practices between organizations conducting safety assessments and will assist in enhancing the confidence of all interested parties that an adequate level of safety has been achieved for facilities and activities. The requirements, which are derived from the Fundamental Safety Principles, relate to any human activity that may cause people to be exposed to radiation risks arising from facilities and activities, as follows: Facilities includes: (a) Nuclear power plants; (b) Other reactors (such as research reactors and critical assemblies); (c) Enrichment facilities and fuel fabrication facilities; (d) Conversion facilities used to generate UF6; (e) Storage and reprocessing plants for irradiated fuel; (f) Facilities for radioactive waste management where radioactive waste is treated, conditioned, stored or disposed of; (g) Any other places where radioactive materials are produced, processed, used, handled or stored; (h) Irradiation facilities for medical, industrial, research and other purposes, and any places where radiation generators are installed; (i

  5. Safety assessment for facilities and activities. General safety requirements. Pt. 4

    International Nuclear Information System (INIS)

    2009-01-01

    The Safety Fundamentals publication, Fundamental Safety Principles, establishes principles for ensuring the protection of workers, the public and the environment, now and in the future, from harmful effects of ionizing radiation. The objective of this Safety Requirements publication is to establish the generally applicable requirements to be fulfilled in safety assessment for facilities and activities, with special attention paid to defence in depth, quantitative analyses and the application of a graded approach to the ranges of facilities and of activities that are addressed. The publication also addresses the independent verification of the safety assessment that needs to be carried out by the originators and users of the safety assessment. This publication is intended to provide a consistent and coherent basis for safety assessment across all facilities and activities, which will facilitate the transfer of good practices between organizations conducting safety assessments and will assist in enhancing the confidence of all interested parties that an adequate level of safety has been achieved for facilities and activities. The requirements, which are derived from the Fundamental Safety Principles, relate to any human activity that may cause people to be exposed to radiation risks arising from facilities and activities, as follows: Facilities includes: (a) Nuclear power plants; (b) Other reactors (such as research reactors and critical assemblies); (c) Enrichment facilities and fuel fabrication facilities; (d) Conversion facilities used to generate UF 6 ; (e) Storage and reprocessing plants for irradiated fuel; (f) Facilities for radioactive waste management where radioactive waste is treated, conditioned, stored or disposed of; (g) Any other places where radioactive materials are produced, processed, used, handled or stored; (h) Irradiation facilities for medical, industrial, research and other purposes, and any places where radiation generators are installed; (i

  6. Safety Assessment for Facilities and Activities. General Safety Requirements. Pt. 4

    International Nuclear Information System (INIS)

    2010-01-01

    The Safety Fundamentals publication, Fundamental Safety Principles, establishes principles for ensuring the protection of workers, the public and the environment, now and in the future, from harmful effects of ionizing radiation. The objective of this Safety Requirements publication is to establish the generally applicable requirements to be fulfilled in safety assessment for facilities and activities, with special attention paid to defence in depth, quantitative analyses and the application of a graded approach to the ranges of facilities and of activities that are addressed. The publication also addresses the independent verification of the safety assessment that needs to be carried out by the originators and users of the safety assessment. This publication is intended to provide a consistent and coherent basis for safety assessment across all facilities and activities, which will facilitate the transfer of good practices between organizations conducting safety assessments and will assist in enhancing the confidence of all interested parties that an adequate level of safety has been achieved for facilities and activities. The requirements, which are derived from the Fundamental Safety Principles, relate to any human activity that may cause people to be exposed to radiation risks arising from facilities and activities, as follows: Facilities includes: (a) Nuclear power plants; (b) Other reactors (such as research reactors and critical assemblies); (c) Enrichment facilities and fuel fabrication facilities; (d) Conversion facilities used to generate UF6; (e) Storage and reprocessing plants for irradiated fuel; (f) Facilities for radioactive waste management where radioactive waste is treated, conditioned, stored or disposed of; (g) Any other places where radioactive materials are produced, processed, used, handled or stored; (h) Irradiation facilities for medical, industrial, research and other purposes, and any places where radiation generators are installed; (i

  7. Safety Assessment for Facilities and Activities. General Safety Requirements. Pt. 4

    International Nuclear Information System (INIS)

    2009-01-01

    The Safety Fundamentals publication, Fundamental Safety Principles, establishes principles for ensuring the protection of workers, the public and the environment, now and in the future, from harmful effects of ionizing radiation.? read more The objective of this Safety Requirements publication is to establish the generally applicable requirements to be fulfilled in safety assessment for facilities and activities, with special attention paid to defence in depth, quantitative analyses and the application of a graded approach to the ranges of facilities and of activities that are addressed. The publication also addresses the independent verification of the safety assessment that needs to be carried out by the originators and users of the safety assessment. This publication is intended to provide a consistent and coherent basis for safety assessment across all facilities and activities, which will facilitate the transfer of good practices between organizations conducting safety assessments and will assist in enhancing the confidence of all interested parties that an adequate level of safety has been achieved for facilities and activities. The requirements, which are derived from the Fundamental Safety Principles, relate to any human activity that may cause people to be exposed to radiation risks arising from facilities and activities, as follows: Facilities includes: (a) Nuclear power plants; (b) Other reactors (such as research reactors and critical assemblies); (c) Enrichment facilities and fuel fabrication facilities; (d) Conversion facilities used to generate UF6; (e) Storage and reprocessing plants for irradiated fuel; (f) Facilities for radioactive waste management where radioactive waste is treated, conditioned, stored or disposed of; (g) Any other places where radioactive materials are produced, processed, used, handled or stored; (h) Irradiation facilities for medical, industrial, research and other purposes, and any places where radiation generators are

  8. Liability to disgorge profits upon breach of contract or a delict

    NARCIS (Netherlands)

    Schrage, E.J.H.

    2013-01-01

    Remedies regarding contract and tort are, generally speaking, concerned with the incidence of liability for loss or damage suffered, whereas the claim in unjust enrichment is said to require that the enrichment has occurred at the expense of the creditor. Consequently claims for breach of contract

  9. Construction contracting for the 1990s

    International Nuclear Information System (INIS)

    Kane, C.; Lyon, V.F.

    1991-01-01

    This paper reports that power plant constructing during the 1980s is over. Demand growth projections presently anticipate a need for 100,000 MW of new capacity by the year 2000, with only a small percentage of the demand growth currently under construction. Given a six-year lead time for baseload plants, a surge of activity must now begin. Another development over the past five years has been a conscious decision by regulators in increase rates only for the costs of efficiently built plants. The cost of construction inefficiencies will no longer be shouldered by investors. Large construction claims, excessive cost overruns, and expensive delays will no longer be passed on to the consumer automatically. Utility commissions will require the inefficient builders to either clean up their act or forego building their own plants. The most traditional contracting scheme, general contracting, will probably be the lease desirable in the construction of new power plants. General contracting is a single, general construction contract based on a detailed design. The design is not performed by the general contractor

  10. Service quality in contracted facilities.

    Science.gov (United States)

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  11. 29 CFR 4.142 - Contracts in an indefinite amount.

    Science.gov (United States)

    2010-07-01

    ... McNamara-O'Hara Service Contract Act Determining Amount of Contract § 4.142 Contracts in an indefinite amount. (a) Every contract subject to this Act which is indefinite in amount is required to contain the....), a case arising under the Walsh-Healey Public Contracts Act. Such a contract, which may be in the...

  12. 48 CFR 32.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.114 Unusual contract financing. Any contract financing arrangement that deviates from this part is unusual contract financing...

  13. 78 FR 12676 - Timing Requirements for the Submission of a Site Assessment Plan (SAP) or General Activities Plan...

    Science.gov (United States)

    2013-02-25

    ...: BOEM-2012-0077] RIN 1010-AD77 Timing Requirements for the Submission of a Site Assessment Plan (SAP) or... would amend the timing requirements for submitting a Site Assessment Plan (SAP) or General Activities... and grants will have a preliminary term of 12 months in which a lessee or grantee must submit a SAP or...

  14. 48 CFR 904.7201 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 904.7201... MATTERS Public Affairs 904.7201 Contract clause. The contracting officer shall insert the clause at 952.204-75, Public Affairs, in solicitations and contracts that require the contractor to release...

  15. 48 CFR 947.7002 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 947.7002 Section 947.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT TRANSPORTATION Foreign Travel 947.7002 Contract clause. When foreign travel may be required under the contract...

  16. 48 CFR 811.404 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.404... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 811.404 Contract clause. When delivery is required by or on a particular date for f.o.b. destination contracts, the contracting officer...

  17. Exclusive contracts in the hospital setting: a two-edged sword, part 1: legal issues.

    Science.gov (United States)

    Portman, Robert M

    2007-05-01

    Hospitals routinely enter into contracts with radiology groups for the right to be the exclusive provider of radiology services at the facility in exchange for the group agreeing to provide and manage all aspects of that service within the hospital. These "exclusive contracts" generally result in the radiology department and associated equipment being closed off to physicians who are not part of the contracting group. Exclusive contracts are generally considered to be good for physicians who have them and bad for those excluded by them. In fact, while exclusive contracts offer obvious benefits to the physicians who receive them and obvious disadvantages for those who are excluded, they also present pitfalls for physicians in the chosen group. Part I of this article discusses the legal issues raised by exclusive contracts. Although these agreements appear to be anti-competitive, most courts have rejected antitrust challenges to exclusive contracts. Excluded physicians have had much greater success in attacking exclusive contracting arrangements on breach of contract and procedural/due process grounds. Exclusive contracting arrangements can also raise concerns under the Medicare-Medicaid anti-kickback statute if the contracting physicians are required to pay consideration or accept less than fair market value compensation in exchange for exclusive contracts. These agreements can also raise issues under the Stark II physician self-referral law if the contracting physicians are in a position to refer Medicare or Medicaid patients to the hospital. Part II of this article will discuss the advantages and disadvantages of exclusive contracts for physicians covered and not covered by such contracts, as well as strategies for avoiding them or minimizing their potential adverse impact. It also will discuss specific provisions of exclusive contracts that should be included or avoided.

  18. Procedures Manual: A Guide to Uniform Grant and Contract Management Standards and The Common Rule for Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments.

    Science.gov (United States)

    Conable, Sharon R.

    This manual has been compiled to provide consistent grant application and administrative procedures for state agencies which award grants or contracts to local governments. It provides a conceptual framework of information concerning the reporting, financial, contractual, and auditing requirements for recipients of Texas State Library grants…

  19. Influence of Alcohol and Tobacco Use on Sodium Thiopental Requirements in General Anesthesia: A Retrospective Study of 700 Patients

    OpenAIRE

    Bashir, K. R.; Raman, S.; Knott, V. J.; Bulmer, D. R.; Hurtig, J. B.

    1981-01-01

    Hospital charts of 700 patients who had undergone upper gastrointestinal surgery were reviewed to examine the relationship between alcohol abuse and dose of intravenous sodium thiopental (Pentothal) required to induce general anesthesia. Patients who required a high sodium thiopental dose (greater than 6.08 mg/kg) exhibited a higher incidence of alcoholism, heavy drinking, and heavy smoking, compared to patients who required low sodium thiopental dose (greater than 3.42 mg/kg and less than 4....

  20. 75 FR 42283 - Review of Arbitration Awards; Miscellaneous and General Requirements

    Science.gov (United States)

    2010-07-21

    ... supported the provision of assistance from the Authority's Collaboration and Alternative Dispute Resolution... that ``the requirements and relevant material regarding alternative dispute resolution be set forth... regulation set forth ``the requirements and relevant material regarding alternative dispute resolution...

  1. Contract Renewal Information - all Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — Multifamily Portfolio datasets (section 8 contracts) - The information has been compiled from multiple data sources within FHA or its contractors. HUD oversees more...

  2. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  3. General Requirements to the Preparation of Tinctures, Decoctions. Dosage of Phytopreparations

    Directory of Open Access Journals (Sweden)

    I.B. Yershovа

    2016-09-01

    Full Text Available The article describes the advantages and disadvantages of using herbal medicine, general information for the collection of medicinal plants. According to the World Health Organization, the classification of herbal medicine is an integral part of traditional medicine. It refers to the variety of metabolic therapy. This treatment meets the requirements of pathogenetic therapy. Currently, more than 30 % of medicines on the pharmaceutical market have herbal origin. According to the World Health Organization, about 80 % of the world population use mainly traditional medicines of natural origin within the framework of primary health care system. Analysis of publications on phytotherapy revealed insufficient coverage of contraindications and side effects of certain plants. This was the basis for opening in our magazine this column, and we wanted to start with what would be the advantages and disadvantages of phytotherapy. Benefits of herbal medi­cine: biological proximity of the active substances of plants and active substances of the body, harmony therapy for the human body, the prolonged effect of herbal medicines after the completion of therapy, the opportunity to prepare a wide variety of different dosage forms, for both indoor and outdoor use, compatibility with many synthetic pharmaceuticals drugs, comprehensive multilateral action of plants, no side effects, simplicity and ease of preparation of herbal remedies at home, the availability for the majority of patients due to the low cost of the medicines. Limitations of herbal medicine: the complexity of the standardization of the treatment effect of herbal drugs, the complexity of establishing a dose, selectivity of diseases, in which typical herbal remedies are prescribed, the risk of poisoning, particularly in self-collection of medicinal plants. The article also provides methods for the preparation of various forms of herbal remedies, dosage for adults and children. With all the advantages of

  4. Specific performance as a primary remedy in the South African law of contract

    Directory of Open Access Journals (Sweden)

    Jean Chrysostome Kanamugire

    2015-07-01

    Full Text Available Specific performance is a primary remedy for breach of contract available for the aggrieved party. This order emphasises the performance of contractual obligations. Although the plaintiff can elect to claim specific performance from the defendant, the court has a discretion to grant or decline the order of specific performance. The discretion must be exercised judicially and does not confine on rigid rules. Courts decide each case according to its own facts and circumstances. Plaintiff has a right of election whether to claim specific performance from the defendant or damages for breach of contract. The defendant does not enjoy any choice in this matter. As a general rule, specific performance is not often awarded in the contract of services. However, recent developments have demonstrated that specific performance will usually be granted in employment contracts if there is equality of bargaining power among contracting parties and such order will not produce undue hardship to the defaulting party. Public policy generally favours the utmost freedom of contract and requires that parties should respect or honour their contractual obligations in commercial transactions. Public policy is rooted in the constitution and can sparingly be used to strike down contracts. Specific performance should not continue to be a primary remedy for breach of contract. Contracting parties should be allowed to resile from the contract and use damages as a remedy for breach of contract

  5. Turnkey contracts

    International Nuclear Information System (INIS)

    Langetepe, G.

    1977-01-01

    To make energy available economically and in sufficient quantity is a main point for the future of an industrial and more for a developing country. The investment costs and the availability of a power plant and in particular for a nuclear power plant are the most significant factors in the economic operation of the plant. In the phase before signing the contract the essential decisions are made with high influence in the economic operation and the availability of the plant. A turn-key contract offers good possibilities to minimize the risks referring a) the plant quality and functionality, b) the plant investment cost, c) the plant completion date, d) the handling of the licensing procedures, e) the availability of the operation. The lecture mentions the points which are of high influence for a successful erection and operation period and which must be clarified before signing the contract between the buyer and supplier of the plant. (orig./HP) [de

  6. 48 CFR 801.602-71 - Basic review requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Basic review requirements... GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities 801.602-71 Basic review requirements. Contracting officers must obtain...

  7. Alternative staffing services. Contract transcription.

    Science.gov (United States)

    Tessier, C

    1992-03-01

    Contract medical transcription services can be of great assistance in meeting the demands for transcription, without jeopardizing patient, physician, or institutional confidentiality. You simply must require the contract service to provide at least the same degree of protection and preservation of confidentiality that you should require inhouse. To achieve this you must make these requirements explicit, comprehensive, comprehensible, believable, and enforceable. Discuss the requirements with prospective contractors. Review them at least annually with existing contractors and when contracts are due for renewal. Be sure to specify the consequence of breaching confidentiality, and if there are breaches, enforce the terms of the contract. Consult your institution's legal counsel both in developing the contract and in enforcing its provisions. Take into consideration your department's and institution's policies, AHIMA's statement on confidentiality, as well as local, state, and federal laws. Above all, never lose sight of the patient. Ultimately, it is not patient information that you are obligated to protect. It is the patient.

  8. Startpoints via weak contractions

    OpenAIRE

    Agyingi, Collins Amburo; Gaba, Yaé Ulrich

    2018-01-01

    Startpoints (resp. endpoints) can be defined as "oriented fixed points". They arise naturally in the study of fixed for multi-valued maps defined on quasi-metric spaces. In this article, we give a new result in the startpoint theory for quasi-pseudometric spaces. The result we present is obtained via a generalized weakly contractive set-valued map.

  9. 40 CFR 63.2450 - What are my general requirements for complying with this subpart?

    Science.gov (United States)

    2010-07-01

    ...., continuous process vents, batch process vents, storage tanks, transfer operations, and waste management units... requirements based on the hierarchy presented in paragraphs (c)(2)(i) through (vi) of this section. For a combined stream, the applicable requirements are specified in the highest-listed paragraph in the hierarchy...

  10. 38 CFR 61.80 - General operation requirements for supportive housing and service centers.

    Science.gov (United States)

    2010-07-01

    ... requirements. (b) Except for such variations as are proposed by the recipient that would not affect compliance... requirements: (1) The structures must be structurally sound so as not to pose any threat to the health and... recipient, to the extent that such entity considers and makes policies and decisions regarding any project...

  11. 9 CFR 113.100 - General requirements for inactivated bacterial products.

    Science.gov (United States)

    2010-01-01

    ... instances, the guinea pig safety test provided in § 113.38 shall be conducted in place of the mouse safety... Outline of Production, an inactivated bacterial product shall meet the applicable requirements in this... in poultry as defined in the specific Standard Requirement or Outline of Production for the product...

  12. 42 CFR 436.811 - Medically needy income standard: General requirements.

    Science.gov (United States)

    2010-10-01

    ... THE VIRGIN ISLANDS Financial Requirements for the Medically Needy Medically Needy Income Standard... groups that meets the requirements of this section. (b) The income standard must take into account the... the State's covered medically needy group or groups of individuals under § 436.301. (d) The income...

  13. 78 FR 64237 - Information Collection: General and Oil and Gas Production Requirements in the Outer Continental...

    Science.gov (United States)

    2013-10-28

    ... OCS Lands Act, other applicable laws, and BOEM regulations; and does not unreasonably interfere with.... The form requests general information about the reservoir and the company, volumetric data, and fluid...

  14. Physical environment. [environmental impact statement required for general aviation airport construction

    Science.gov (United States)

    1975-01-01

    Environmental legislation affecting airports and the more common environmental effects resulting from airport construction are discussed with special emphasis on general aviation airports. The discussion is focused on the regulation of noise, pollution, and water quality.

  15. 76 FR 73644 - Announcement of Requirements and Registration for the United States Surgeon General's Healthy...

    Science.gov (United States)

    2011-11-29

    ..., excessive alcohol use) and these chronic illnesses have been well established. The Surgeon General's Vision... computer, a mobile device (e.g., mobile phone, portable sensor, etc.), console, or any platform broadly...

  16. Strong Convergence Theorems of a New General Iterative Process with Meir-Keeler Contractions for a Countable Family of -Strict Pseudocontractions in -Uniformly Smooth Banach Spaces

    Directory of Open Access Journals (Sweden)

    Song Yanlai

    2010-01-01

    Full Text Available We introduce a new iterative scheme with Meir-Keeler contractions for strict pseudocontractions in -uniformly smooth Banach spaces. We also discuss the strong convergence theorems for the new iterative scheme in -uniformly smooth Banach space. Our results improve and extend the corresponding results announced by many others.

  17. Office of Inspector General report on special audit of pension plans for Department of Energy contract employees of the University of California

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    On May 15, 1996, the Department of Energy (DOE) announced its decision to extend and renegotiate its contracts with the University of California for the management and operation of the Los Alamos, Lawrence Berkeley, and Lawrence Livermore National Laboratories. Current contracts for the operation of these laboratories expire in 1997. The renegotiation process provides an opportunity for the Department to: (1) recover at least $620 million in excess assets from the pension plans it has funded for University of California employees who work at DOE`s laboratories; and (2) improve the Department`s ability to exercise prudent management of its interest in those pension funds. According to Department records, as of July 1, 1995, the University of California Retirement Plan had between $620 million and $2.0 billion in excess assets that were attributable to the Department of Energy (emphasis supplied). The wide variation in excess assets is a function of the assumptions used in making these calculations. These are described in Appendix 1 to this report. It was concluded as a result of the audit that, as part of the contract renegotiation process, the Department should obtain the cooperation and assistance of the University of California in recovering excess pension plan assets in a manner that does not affect the defined retirement benefits of the contract employees. This could include jointly sponsoring legislation to modify any existing legal restrictions.

  18. 48 CFR 9.302 - General.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false General. 9.302 Section 9... CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.302 General. First article testing and... that conforms to all contract requirements for acceptance. Before requiring testing and approval, the...

  19. A survey of formal languages for contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom

    2010-01-01

    In this short paper we present the current status on formal languages and models for contracts. By a formal model is meant an unambiguous and rigorous representation of contracts, in order to enable their automatic validation, execution, and analysis — activates that are collectively referred...... to as contract lifecycle management (CLM). We present a set of formalism requirements, which represent features that any ideal contract model should support, based on which we present a comparative survey of existing contract formalisms....

  20. Contract manual for the gas industry. Practically oriented drafting and legally compliant application; Vertragshandbuch Gaswirtschaft. Praxisgerechte Gestaltung und rechtssichere Anwendung

    Energy Technology Data Exchange (ETDEWEB)

    Baumgert, Caspar (ed.) [WEMAG AG, Schwerin (Germany)

    2010-07-01

    The handbook presents all contracts on the delivery and grid side, including their specific clauses and variants along the value chain. This includes base load and auxiliary supply, contracts for private, commercial and industrial special customers as well as re-distributors, metering contracts, grid contracts, storage contracts, and biogas and heat supply contracting. The legal problems are outlined clearly and easy to understand, and the following questions are answered: What are the boundary conditions set by the new energy industry law and general civil law? Inhowfar are the contents of contracts influenced by legal specifications? What options are available for contract drafting, and what are their consequences? What contents are of particular importance? What are the requirements that result from price regulation by civil and cartel law? What is the role of licence fees in product design? What are the chances and risks of innovative products? What options for reaction do providers have in case of (impending) customer insolvency? (orig./RHM)

  1. Preparedness and Response for a Nuclear or Radiological Emergency. General Safety Requirements (Chinese Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This publication, jointly sponsored by the FAO, IAEA, ICAO, ILO, IMO, INTERPOL, OECD/NEA, PAHO, CTBTO, UNEP, OCHA, WHO and WMO, is the new edition establishing the requirements for preparedness and response for a nuclear or radiological emergency which takes into account the latest experience and developments in the area. It supersedes the previous edition of the Safety Requirements for emergency preparedness and response, Safety Standards Series No. GS-R-2, which was published in 2002. This publication establishes the requirements for ensuring an adequate level of preparedness and response for a nuclear or radiological emergency, irrespective of its cause. These Safety Requirements are intended to be used by governments, emergency response organizations, other authorities at the local, regional and national levels, operating organizations and the regulatory body as well as by relevant international organizations at the international level.

  2. Preparedness and Response for a Nuclear or Radiological Emergency. General Safety Requirements (Arabic Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This publication, jointly sponsored by the FAO, IAEA, ICAO, ILO, IMO, INTERPOL, OECD/NEA, PAHO, CTBTO, UNEP, OCHA, WHO and WMO, is the new edition establishing the requirements for preparedness and response for a nuclear or radiological emergency which takes into account the latest experience and developments in the area. It supersedes the previous edition of the Safety Requirements for emergency preparedness and response, Safety Standards Series No. GS-R-2, which was published in 2002. This publication establishes the requirements for ensuring an adequate level of preparedness and response for a nuclear or radiological emergency, irrespective of its cause. These Safety Requirements are intended to be used by governments, emergency response organizations, other authorities at the local, regional and national levels, operating organizations and the regulatory body as well as by relevant international organizations at the international level.

  3. Preparedness and Response for a Nuclear or Radiological Emergency. General Safety Requirements (Russian Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This publication, jointly sponsored by the FAO, IAEA, ICAO, ILO, IMO, INTERPOL, OECD/NEA, PAHO, CTBTO, UNEP, OCHA, WHO and WMO, is the new edition establishing the requirements for preparedness and response for a nuclear or radiological emergency which takes into account the latest experience and developments in the area. It supersedes the previous edition of the Safety Requirements for emergency preparedness and response, Safety Standards Series No. GS-R-2, which was published in 2002. This publication establishes the requirements for ensuring an adequate level of preparedness and response for a nuclear or radiological emergency, irrespective of its cause. These Safety Requirements are intended to be used by governments, emergency response organizations, other authorities at the local, regional and national levels, operating organizations and the regulatory body as well as by relevant international organizations at the international level.

  4. 50 CFR 13.12 - General information requirements on applications for permits.

    Science.gov (United States)

    2010-10-01

    ... available, occupation, and any business, agency, organizational, or institutional affiliation associated... permits, together with any additional justification, including supporting documentation as required by the... permit Section Importation at nondesignated ports: Scientific 14.31 Deterioration prevention 14.32...

  5. LEGAL REGULATION OF ADMINISTRATIVE CONTRACTS IN BOSNIA AND HERZEGOVINA

    Directory of Open Access Journals (Sweden)

    Edina Šehrić

    2016-09-01

    Full Text Available The institute of administrative contract was mentioned for the first time in the legislation of our country in the Preliminary Draft to the Law on Amandments of the Law on Administrative Procedure of Bosnia and Herzegovina from 2012. Although insufficiently, the first step is made towards fullfillment of the reform requirements in the area of admisitrative procedure on the way to the European integration and in accordance with the changed role of administration and the need for improvement of cooperation between the administration and citizens, or legal entities. In Bosnia and Herzegovina there is still no general legal regulation of administrative contracts, but administrative contracts are subjects to specific laws and as such already exist in the legal system. After some introductory remarks, the paper deals with the concept and characteristics of administrative contracts, and also presents legal regulation of administrative contracts highlighting their specificities and differences in relation to private law contracts. The importance of general legal norm governing administrative contracts is especially emphasized, as well as their importance for reform processes in our country. Accordingly, the importance of introducing a complaint as a legal remedy that a client can use if the public authority fails to meet contractual obligations is pointed out, but also the possibility of judicial protection in case of legal dispute.

  6. URGENSI STUDI TENTANG PROCUREMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Yohanes Sogar Simamora

    2006-01-01

    Full Text Available Contractualization is kind of goverment activity in acquiring goods, services and infrastructure as well. Procurement contract has several important function especially in enhancing economic development in a state. In Indonesia, this kind of contract also has function in empowering micro economic scale. Since the aim of procurement study is to provide equal protection between public fund interest in one hand and privat sector in the other hand, general principle of contract law must be taken into consideration together with transparency as the most important principle in government contract.

  7. Intimate terrorism and situational couple violence in general surveys: ex-spouses required.

    Science.gov (United States)

    Johnson, Michael P; Leone, Janel M; Xu, Yili

    2014-02-01

    In this article, we argue that past efforts to distinguish among types of intimate partner violence in general survey data have committed a critical error--using data on current spouses to develop operationalizations of intimate terrorism and situational couple violence. We use ex-spouse data from the National Violence Against Women Survey (NVAWS) to develop new operationalizations. We then demonstrate that NVAWS current spouse data contain little intimate terrorism; we argue that this is likely to be the case for all general surveys. In addition, the ex-spouse data confirm past findings regarding a variety of differences between intimate terrorism and situational couple violence, including those predicted by feminist theories.

  8. 76 FR 7522 - Federal Acquisition Regulation; Enhancing Contract Transparency

    Science.gov (United States)

    2011-02-10

    ... transparency while retaining the protection of information that should be considered in the contracting process... the need for transparency in Government contracting information and believe these recommendations... Regulation; Enhancing Contract Transparency AGENCY: Department of Defense (DoD), General Services...

  9. 77 FR 12845 - Announcement of Requirements and Registration for Surgeon General's (SG) Youth Video Contest

    Science.gov (United States)

    2012-03-02

    ... of the Contest and their immediate family (spouse, parents and step-parents, siblings and step-siblings, and children and step- children) and household members (people who share the same residence at... conjunction with the launch of the new SG Report, the Surgeon General will be releasing a Consumer Piece in...

  10. 40 CFR 270.14 - Contents of part B: General requirements.

    Science.gov (United States)

    2010-07-01

    ..., and engineering studies shall be certified by a qualified Professional Engineer. For post-closure... § 264.1 provides otherwise: (1) A general description of the facility. (2) Chemical and physical... atmosphere. (9) A description of precautions to prevent accidental ignition or reaction of ignitable...

  11. 75 FR 22540 - Review of Arbitration Awards; Miscellaneous and General Requirements

    Science.gov (United States)

    2010-04-29

    ... the Authority's existing practice for calculating the date for filing timely exceptions, so that the... general rules regarding calculating filing periods; and Sec. 2429.22 to specify that the rules set forth..., investment, productivity, innovation, or on the ability of United States-based companies to compete with...

  12. 38 CFR 59.130 - General requirements for all State home facilities.

    Science.gov (United States)

    2010-07-01

    ... design and construct the project to provide sufficient space and equipment in dining, health services... safety of participants, personnel and the public. (b) A State home must meet the general conditions of..., including the Uniform Federal Accessibility Standards (UFAS) (24 CFR part 40, appendix A), during the design...

  13. Contingency Contracting within the Department of Defense: A Comparative Analysis

    National Research Council Canada - National Science Library

    McMillion, Chester

    2000-01-01

    .... The thesis compares and contrasts the regulations governing the contingency contracting operations, the organization structure, contingency contracting support plans, and the training requirements...

  14. 48 CFR 927.409 - Solicitation provisions and contract clauses. (DOE coverage-paragraphs (a), (h), (s), and (t))

    Science.gov (United States)

    2010-10-01

    ... Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND... formatted as a computer data base. (8) Unlimited rights, as used in this clause, means the rights of the...

  15. Governmental, Legal and Regulatory Framework for Safety. General Safety Requirements. Part 1, Revision 1 (Chinese Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This publication establishes requirements in respect of the governmental, legal and regulatory framework for safety. It covers the essential aspects of the framework for establishing a regulatory body and taking other actions necessary to ensure the effective regulatory control of facilities and activities utilized for peaceful purposes. Other responsibilities and functions, such as liaison within the global safety regime and on support services for safety (including radiation protection), emergency preparedness and response, nuclear security, and the State system of accounting for and control of nuclear material, are also covered. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication.

  16. 48 CFR 1239.70 - Solicitation provision and contract clause.

    Science.gov (United States)

    2010-10-01

    ... 1252.239-71, Information Technology Security Plan and Accreditation, and the clause at (TAR) 48 CFR 1252.239-70, Security Requirements for Unclassified Information Technology Resources, in all... TRANSPORTATION SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 1239.70...

  17. 49 CFR 174.82 - General requirements for the handling of placarded rail cars, transport vehicles, freight...

    Science.gov (United States)

    2010-10-01

    ... rail cars, transport vehicles, freight containers, and bulk packages. 174.82 Section 174.82... Placarded Rail Cars, Transport Vehicles and Freight Containers § 174.82 General requirements for the handling of placarded rail cars, transport vehicles, freight containers, and bulk packages. (a) Unless...

  18. 42 CFR 84.159 - Man tests for gases and vapors; supplied-air respirators; general performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Man tests for gases and vapors; supplied-air respirators; general performance requirements. 84.159 Section 84.159 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES...

  19. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  20. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

  1. Contract law: relationship between dermatologists and third-party payers.

    Science.gov (United States)

    Askanas, A V

    1993-04-01

    The relationship between third-party payers and dermatologists is generally governed by a written contract. That relationship can be more beneficial to the dermatologist, and chances of liability may be decreased, both for breach of contract and for malpractice, if the dermatologist pays close attention to the language in the contract. All contracts are generally negotiable; detrimental language in the contract often may be removed or changed. This article presents information to help prepare dermatologists to review and negotiate contracts.

  2. 40 CFR 80.65 - General requirements for refiners and importers.

    Science.gov (United States)

    2010-07-01

    ... to all gasoline produced, imported, transported, stored, sold, or dispensed: (1) At any location... gasoline or RBOB it produces or imports, shall meet: (i) Those standards and requirements it designated... importer of gasoline shall designate the gasoline it produces or imports as follows: (1) All gasoline...

  3. 21 CFR 1240.80 - General requirements for water for drinking and culinary purposes.

    Science.gov (United States)

    2010-04-01

    ... culinary purposes. 1240.80 Section 1240.80 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF... requirements for water for drinking and culinary purposes. Only potable water shall be provided for drinking and culinary purposes by any operator of a conveyance engaged in interstate traffic, except as...

  4. 75 FR 29420 - Revision of LNG and LHG Waterfront Facility General Requirements

    Science.gov (United States)

    2010-05-26

    ... of that document are key elements of the risk management process. Coast Guard review ensures that the... management strategies; and (v) Resource needs for maritime safety, security, and response. (g) The Follow-on... requirements until the collection is approved by the Office of Management and Budget (OMB). When OMB approves...

  5. 49 CFR 172.302 - General marking requirements for bulk packagings.

    Science.gov (United States)

    2010-10-01

    ... rail cars; (2) Have a width of at least 4.0 mm (0.16 inch) and a height of at least 25 mm (one inch... with a proper shipping name, common name or identification number as required by this subpart must... “NITRIC OXIDE” need not be remarked “NITRIC OXIDE, COMPRESSED”. (g) A rail car, freight container, truck...

  6. 40 CFR 63.11173 - What are my general requirements for complying with this subpart?

    Science.gov (United States)

    2010-07-01

    ... of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) Method 52.1, “Gravimetric and Dust...-atomizing methods may also be used. (5) As provided in § 63.6(g), we, the U.S. Environmental Protection...) Environmental compliance with the requirements of this subpart. (3) A description of the methods to be used at...

  7. 30 CFR 816.71 - Disposal of excess spoil: General requirements.

    Science.gov (United States)

    2010-07-01

    ... does not slake in water or degrade to soil material, and which is free of coal, clay or other... of the soil. (2) Excess spoil shall be transported and placed in a controlled manner in horizontal... outslope of the fill if required for stability, control of erosion, to conserve soil moisture, or to...

  8. 30 CFR 817.71 - Disposal of excess spoil: General requirements.

    Science.gov (United States)

    2010-07-01

    ... does not slake in water or degrade to soil materials, and which is free of coal, clay or other... of the soil. (2) Excess spoil shall be transported and placed in a controlled manner in horizontal... outslope of the fill if required for stability, control of erosion, to conserve soil moisture, or to...

  9. 9 CFR 113.200 - General requirements for killed virus vaccines.

    Science.gov (United States)

    2010-01-01

    ... completed product from each serial shall be tested for safety in guinea pigs as prescribed in § 113.38 and... an applicable Standard Requirement or in the filed Outline of Production, a killed virus vaccine.... Suitable tests to assure complete inactivation shall be written into the filed Outline of Production. (b...

  10. 42 CFR 436.840 - Medically needy resource standard: General requirements.

    Science.gov (United States)

    2010-10-01

    ... THE VIRGIN ISLANDS Financial Requirements for the Medically Needy Medically Needy Resource Standard... eligibility under the cash assistance programs that are related to the State's covered medically needy group or groups of individuals under § 436.301. (b) The resource standard established under paragraph (a...

  11. Muscle Contraction.

    Science.gov (United States)

    Sweeney, H Lee; Hammers, David W

    2018-02-01

    SUMMARYMuscle cells are designed to generate force and movement. There are three types of mammalian muscles-skeletal, cardiac, and smooth. Skeletal muscles are attached to bones and move them relative to each other. Cardiac muscle comprises the heart, which pumps blood through the vasculature. Skeletal and cardiac muscles are known as striated muscles, because the filaments of actin and myosin that power their contraction are organized into repeating arrays, called sarcomeres, that have a striated microscopic appearance. Smooth muscle does not contain sarcomeres but uses the contraction of filaments of actin and myosin to constrict blood vessels and move the contents of hollow organs in the body. Here, we review the principal molecular organization of the three types of muscle and their contractile regulation through signaling mechanisms and discuss their major structural and functional similarities that hint at the possible evolutionary relationships between the cell types. Copyright © 2018 Cold Spring Harbor Laboratory Press; all rights reserved.

  12. INDEFINITE CONTRACT REVIEW 2000

    CERN Multimedia

    Division des ressources humaines

    2000-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen:1.\tCandidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2.\tThe criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following:staff members who are in their fourth year of service on a fixed-term contract;in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consid...

  13. INDEFINITE CONTRACT REVIEW 2001

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen: 1. Candidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2. The criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following: staff members who are in their fourth year of service on a fixed-term contract; in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consideration fo...

  14. 29 CFR 6.4 - Subpoenas (Service Contract Act).

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Subpoenas (Service Contract Act). 6.4 Section 6.4 Labor... STANDARDS IN FEDERAL AND FEDERALLY ASSISTED CONSTRUCTION CONTRACTS AND FEDERAL SERVICE CONTRACTS General § 6.4 Subpoenas (Service Contract Act). All applications under the Service Contract Act for subpoenas ad...

  15. Contractions of quantum algebraic structures

    International Nuclear Information System (INIS)

    Doikou, A.; Sfetsos, K.

    2010-01-01

    A general framework for obtaining certain types of contracted and centrally extended algebras is reviewed. The whole process relies on the existence of quadratic algebras, which appear in the context of boundary integrable models. (Abstract Copyright [2010], Wiley Periodicals, Inc.)

  16. General laws of competition duel and universal requirements to technical-tactic fitness of elite wrestlers

    Directory of Open Access Journals (Sweden)

    G.V. Korobeynikov

    2016-02-01

    Full Text Available Purpose: to determine and formulate general technical-tactic laws (rules of competition duel in modern free style wrestling. Material: competition functioning of free style wrestlers at Olympic Games has been analyzed. Results of authors’ own pedagogic observations and advanced experience of free style wrestling specialists have been generalized. Results: it was found that victory in duel can be resulted only from attacking tactic of duel. It was determined that wrestlers’ activity (quantity of actual attacks in unit of time varies from 1 to 2.2 attacks per minute. Reliability of attack (ratio of quantity of assessed attacks to quantity of actually fulfilled attacks is within 0.33-0.63. Reliability of defense (ratio of quantity of successfully repelled opponent’s attacks to general quantity of his actual attacks is from 0.55-0.78. Efficiency of fighting in stance is within 0.6-1.3 points per minute. Efficiency of ground fighting is 1.3-2.3 points per minute. Conclusions: coach shall bring the formulated laws in compliance with specificity of his functioning and consider them, when planning training process of junior wrestlers.

  17. Contract design

    International Nuclear Information System (INIS)

    Bradley, P.

    2006-01-01

    The current state of the electric power industry in Ontario was discussed with particular reference to the procurement of contracts and why the Ontario Power Authority (OPA) must be contracting to resolve many of Ontario's electricity issues. As Ontario increasingly relies on imports and natural gas-fired generation, the price of electricity continues to rise given that supply is at a low level. In addition to the generation gap, there are also several transmission constrained areas in Ontario, particularly in the Greater Toronto Area (GTA). The OPA announced 2 projects totalling 1900 MW to relieve congestion. According to the Independent Electricity System Operator (IESO), the total potential opportunity for new generation by 2015 is about 5,000 to 7,000 megawatts. OPA is expected to launch procurement processes for up to 1000 MW of cogeneration, 250 MW of province-wide conservation initiatives, 1900 MW of generation in the western part of the GTA, and 600 MW of generation in downtown Toronto. New nuclear capacity is also anticipated in addition to renewables and conservation/demand management (CDM) initiatives. The OPA's competitive procurement processes will include requests for expressions of interest, requests for qualifications and requests for proposals. The challenge of balancing the technical complexities and realities of procuring generation assets with the need for a fair procurement process was discussed. Contracts will be designed to react to market signals and will include 3 styles: tariff style, tolling style and standard offer contract. OPA will make every effort to balance generator and ratepayer interests. 6 figs

  18. Army Contracting: Training and Guidance Needed to Ensure Appropriate Use of the Option to Extend Services Clause

    Science.gov (United States)

    2016-01-28

    reproduce this material separately. The Government Accountability Office, the audit , evaluation, and investigative arm of...Executive Director Army Contracting Command-Redstone Arsenal Army Contracting: Training and Guidance Needed to Ensure Appropriate Use of the Option to...which this report is based in accordance with generally accepted government auditing standards. Those standards require that we plan and perform the

  19. 48 CFR 42.302 - Contract administration functions.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Office Functions 42... officer. (5) Negotiate forward pricing rate agreements (see 15.407-3). (6) Negotiate advance agreements..., packaging, and packing. (38) Ensure contractor compliance with contractual quality assurance requirements...

  20. Does caries risk assessment predict the incidence of caries for special needs patients requiring general anesthesia?

    Science.gov (United States)

    Chang, Juhea; Kim, Hae-Young

    2014-11-01

    The aim of this study was to correlate the caries-related variables of special needs patients to the incidence of new caries. Data for socio-demographic information and dental and general health status were obtained from 110 patients treated under general anesthesia because of their insufficient co-operation. The Cariogram program was used for risk assessment and other caries-related variables were also analyzed. Within a defined follow-up period (16.3 ± 9.5 months), 64 patients received dental examinations to assess newly developed caries. At baseline, the mean (SD) values of the DMFT (decayed, missing and filled teeth) and DT (decayed teeth) for the total patients were 9.2 (6.5) and 5.8 (5.3), respectively. During the follow-up period, new caries occurred in 48.4% of the patients and the mean value (SD) of the increased DMFT (iDMFT) was 2.1 (4.2). The patients with a higher increment of caries (iDMFT ≥3) showed significantly different caries risk profiles compared to the other patients (iDMFT dentistry. Past caries experience and inadequate oral hygiene maintenance were largely related to caries development in special needs patients.

  1. Governmental, Legal and Regulatory Framework for Safety. General Safety Requirements. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-09-15

    The objective of this publication is to establish requirements in respect of the governmental, legal and regulatory framework for safety. It covers the essential aspects of the framework for establishing a regulatory body and taking other actions necessary to ensure the effective regulatory control of facilities and activities utilized for peaceful purposes. Other responsibilities and functions, such as liaison within the global safety regime and on support services for safety (including radiation protection), emergency preparedness and response, nuclear security, and the State system of accounting for and control of nuclear material, are also covered.

  2. Governmental, Legal and Regulatory Framework for Safety. General Safety Requirements. Part 1 (Arabic Edition)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-09-15

    The objective of this publication is to establish requirements in respect of the governmental, legal and regulatory framework for safety. It covers the essential aspects of the framework for establishing a regulatory body and taking other actions necessary to ensure the effective regulatory control of facilities and activities utilized for peaceful purposes. Other responsibilities and functions, such as liaison within the global safety regime and on support services for safety (including radiation protection), emergency preparedness and response, nuclear security, and the State system of accounting for and control of nuclear material, are also covered.

  3. Governmental, Legal and Regulatory Framework for Safety. General Safety Requirements. Part 1 (Spanish Edition)

    International Nuclear Information System (INIS)

    2010-01-01

    The objective of this publication is to establish requirements in respect of the governmental, legal and regulatory framework for safety. It covers the essential aspects of the framework for establishing a regulatory body and taking other actions necessary to ensure the effective regulatory control of facilities and activities utilized for peaceful purposes. Other responsibilities and functions, such as liaison within the global safety regime and on support services for safety (including radiation protection), emergency preparedness and response, nuclear security, and the State system of accounting for and control of nuclear material, are also covered

  4. Governmental, Legal and Regulatory Framework for Safety. General Safety Requirements. Part 1 (French Edition)

    International Nuclear Information System (INIS)

    2010-01-01

    The objective of this publication is to establish requirements in respect of the governmental, legal and regulatory framework for safety. It covers the essential aspects of the framework for establishing a regulatory body and taking other actions necessary to ensure the effective regulatory control of facilities and activities utilized for peaceful purposes. Other responsibilities and functions, such as liaison within the global safety regime and on support services for safety (including radiation protection), emergency preparedness and response, nuclear security, and the State system of accounting for and control of nuclear material, are also covered

  5. Governmental, Legal and Regulatory Framework for Safety. General Safety Requirements. Part 1 (Chinese Edition)

    International Nuclear Information System (INIS)

    2010-01-01

    The objective of this publication is to establish requirements in respect of the governmental, legal and regulatory framework for safety. It covers the essential aspects of the framework for establishing a regulatory body and taking other actions necessary to ensure the effective regulatory control of facilities and activities utilized for peaceful purposes. Other responsibilities and functions, such as liaison within the global safety regime and on support services for safety (including radiation protection), emergency preparedness and response, nuclear security, and the State system of accounting for and control of nuclear material, are also covered

  6. MODERN REQUIREMENTS TO THE GENERAL EDUCATIONAL ESTABLISHMENTS LEADERS IN FOREIGN COUNTRIES (FOREIGN EXPERIENCE

    Directory of Open Access Journals (Sweden)

    I. Malitskaya

    2010-08-01

    Full Text Available As a result of ICT integration into the school educational and administrative process, ICT competence is being included in normative educational documents and standards. In the article it has been considered modern requirements to the school leaders in foreign countries (The USA, Lithuania, European countries, it is presented the National educational technological standards (NETS•A. Performance indicators for administrators developed by International society for technology in education ISTE, which is used for development of their own standards in different foreign countries.

  7. Self-regulation in dentistry and the social contract.

    Science.gov (United States)

    Holden, A C L

    2016-10-21

    This article looks at the General Dental Council (GDC) and dental regulation from the perspective of social contract theory. Self-regulation is a requirement for the dental profession to exist within such a contract with society and this article seeks to examine the effects of the GDC upon the social contract. The GDC maintains that it is independent of the dental profession and while this may be true when discussing impartiality, the existence and purpose of the GDC is intrinsically intertwined with the dental profession. This article will show that the GDC has acted in a manner that has a negative impact upon the social contract between the dental profession and society and that for the dental profession to maintain its status and ability to place patients first, the GDC needs to re-evaluate its role and attitudes.

  8. 24 CFR 983.202 - Purpose of HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Purpose of HAP contract. 983.202... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.202 Purpose of HAP contract. (a) Requirement. The PHA must enter into a HAP contract with the owner. The HAP contract must be...

  9. 42 CFR 414.422 - Terms of contracts.

    Science.gov (United States)

    2010-10-01

    ...)(i) of the Act, if applicable to such subcontractor. (g) Breach of contract. (1) Any deviation from... requirements, constitutes a breach of contract. (2) In the event a contract supplier breaches its contract, CMS... 42 Public Health 3 2010-10-01 2010-10-01 false Terms of contracts. 414.422 Section 414.422 Public...

  10. 48 CFR 32.105 - Uses of contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Uses of contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.105 Uses of contract financing. (a) Contract financing methods covered in this part are intended to be self-liquidating through...

  11. 48 CFR 432.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.114 Unusual contract financing. The HCA is authorized to approve unusual contract financing. The signed determination and finding...

  12. 48 CFR 1332.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 1332.114 Unusual contract financing. The designee authorized to approve unusual contract financing arrangements is set forth in CAM...

  13. 48 CFR 1646.201 - Contract Quality Policy.

    Science.gov (United States)

    2010-10-01

    ... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality... ensure that services acquired under the FEHB contract conform to the contract's quality and audit... assurance program required by the contract and will acknowledge in writing whether or not the system is...

  14. Material properties requirements for LMFBR structural design: General considerations and data needs

    Energy Technology Data Exchange (ETDEWEB)

    Pugh, C E [Oak Ridge National Laboratory, Oak Ridge, TN (United States); Purdy, C M [U.S. Energy Research and Development Administration (United States)

    1977-07-01

    A statement is given of material properties information needed in connection with the structural design technology for liquid-metal fast breeder reactor (LMFBR) primary circuit components. Implementation of current analysis methods and criteria is considered with an emphasis on data and data correlations for performing elastic-plastic and creep analyses, for establishing allowable stress limits, and for computing creep-fatigue damage. Further development of the technology is discussed in relation to properties information. Emphasis is placed on improved constitutive equations for representing inelastic material behavior, on procedures for treating time-dependent fatigue, and on criteria for creep rupture. The properties are generally discussed without regard to specific alloys, since most categories of information are needed for each major structural material. Some sample experimental results are given for type 304 stainless steel and 2 1/4 Cr-1 Mo steel. (author)

  15. Material properties requirements for LMFBR structural design: general considerations and data needs

    International Nuclear Information System (INIS)

    Pugh, C.E.; Purdy, C.M.

    1977-01-01

    A statement is given of material properties information needed in connection with the structural design technology for liquid-metal fast breeder reactor (LMFBR) primary circuit components. Implementation of current analysis methods and criteria is considered with an emphasis on data and data correlations for performing elastic-plastic and creep analyses, for establishing allowable stress limits, and for computing creep-fatigue damage. Further development of the technology is discussed in relation to properties information. Emphasis is placed on improved constitutive equations for representing inelastic material behavior, on procedures for treating time-dependent fatigue, and on criteria for creep rupture. The properties are generally discussed without regard to specific alloys, since most categories of information are needed for each major structural material. Some sample experimental results are given for type 304 stainless steel and 2 1 / 4 Cr-1 Mo steel

  16. 32 CFR 21.625 - Contract.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Contract. 21.625 Section 21.625 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.625 Contract. See the definition for procurement contract in this...

  17. 48 CFR 1430.202 - Disclosure requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Disclosure requirements. 1430.202 Section 1430.202 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Program Requirements 1430.202 Disclosure...

  18. 48 CFR 430.202 - Disclosure requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Disclosure requirements. 430.202 Section 430.202 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Program Requirements 430.202 Disclosure...

  19. 48 CFR 30.202 - Disclosure requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Disclosure requirements. 30.202 Section 30.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Program Requirements 30.202 Disclosure...

  20. 48 CFR 1330.202 - Disclosure requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Disclosure requirements. 1330.202 Section 1330.202 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Program Requirements 1330.202 Disclosure...

  1. Retractable Contracts

    Directory of Open Access Journals (Sweden)

    Franco Barbanera

    2016-02-01

    Full Text Available In calculi for modelling communication protocols, internal and external choices play dual roles. Two external choices can be viewed naturally as dual too, as they represent an agreement between the communicating parties. If the interaction fails, the past agreements are good candidates as points where to roll back, in order to take a different agreement. We propose a variant of contracts with synchronous rollbacks to agreement points in case of deadlock. The new calculus is equipped with a compliance relation which is shown to be decidable.

  2. 48 CFR 570.105-1 - Contracting by negotiation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contracting by negotiation. 570.105-1 Section 570.105-1 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION SPECIAL CONTRACTING PROGRAMS ACQUIRING LEASEHOLD INTERESTS IN REAL PROPERTY General 570.105-1 Contracting by negotiation. Contracting by negotiation...

  3. Generalized peritonitis requiring re-operation after leakage of omental patch repair of perforated peptic ulcer.

    Science.gov (United States)

    Maghsoudi, Hemmat; Ghaffari, Alireza

    2011-01-01

    Peptic ulcer perforations are a common emergency, but available literature is silent on the exact definition, incidence, management, and complications of peritonitis due to omental patch leakage. Retrospective data were collected on 422 patients who underwent omental patch repair of perforated peptic ulcer between March 20, 1999 and March 20, 2006. The definitive diagnosis of perforated peptic ulcer and omental patch leakage was obtained at surgery. Seventeen (4%) patients experienced generalized peritonitis due to omental patch leakage. Mean age was 60.6 years. Mortality rate was 29.4%, and the mean hospital stay was 23.6 days. Delay in surgical approach, shock on admission, and age were all significantly associated with increased mortality. Peritonitis due to omental patch leakage can result in significant morbidity and mortality. The most common causes of omental patch leakage and operative procedures were unknown and reinsertion of omentum, respectively. Factors such as shock on admission or delayed surgery, have significantly contributed to fatal outcomes and need careful attention.

  4. Contract 98 Self-Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of LBL`s Self-Assessment required by Appendix F to Contract DE ACOO3765F00098. This self assessment covers the performance measures set forth in Appendix F except those requiring an external audit. The performance measures for LBL are in the areas of ES&H Finance, Human Services and Procurement and Property. LBL is a multi-program laboratory operated by the University of California (UC) for DOE. The mission of LBL includes performing research in energy, general, and life sciences. LBL facilities include the main site on 130 acres located in the cities of Berkeley and Oakland; laboratories and offices located in buildings on the UC Berkeley Campus; and three leased buildings in the cities of Berkeley and Emeryville. 1. Involvement of Line Management in the assessment process to provide awareness and ownership. 2. Using existing assessments, audits and appraisals in lieu of a new assessment wherever possible. 3. Conduct of the assessments by individuals with functional responsibility and knowledge of the areas being assessed. 4. Interaction with individuals performing assessments at other Laboratories to enhance our learning process. As anticipated, a number of findings will require corrective action. General corrective actions are identified for key findings in this report. In early May 1993, this Laboratory will begin the development of detailed formal corrective action plans which will be entered into a laboratory automated corrective action tracking system.

  5. Periodic review in natural resource contracts | Mandelbaum ...

    African Journals Online (AJOL)

    Periodic contract review mechanisms, which are provisions in contracts that formally require parties to meet at particular intervals to review the terms of the contract, are mechanisms that may facilitate the process of negotiating contractual changes to accommodate changing circumstances over the term of extractive ...

  6. 48 CFR 32.908 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ..., Prompt Payment for Fixed-Price Architect-Engineer Contracts, in solicitations and contracts that contain the clause at 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts. (1) As authorized in... specify a period longer than 7 days for constructive acceptance or constructive approval, if required to...

  7. The multifacet graphically contracted function method. II. A general procedure for the parameterization of orthogonal matrices and its application to arc factors

    Science.gov (United States)

    Shepard, Ron; Gidofalvi, Gergely; Brozell, Scott R.

    2014-08-01

    Practical algorithms are presented for the parameterization of orthogonal matrices Q ∈ {R} m×n in terms of the minimal number of essential parameters {φ}. Both square n = m and rectangular n applications such as the representation of the arc factors in the multifacet graphically contracted function method and the representation of orbital coefficients in SCF and DFT methods. The parameterizations are represented formally using products of elementary Householder reflector matrices. Standard mathematical libraries, such as LAPACK, may be used to perform the basic low-level factorization, reduction, and other algebraic operations. Some care must be taken with the choice of phase factors in order to ensure stability and continuity. The transformation of gradient arrays between the Q and {φ} parameterizations is also considered. Operation counts for all factorizations and transformations are determined. Numerical results are presented which demonstrate the robustness, stability, and accuracy of these algorithms.

  8. General conditions applicable to the contract for access to the public power transportation network for an eligible consuming site; Conditions generales applicables au contrat d'acces au reseau public de transport d'electricite pour un site consommateur eligible

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-01

    On 1 November 2002, the new tariffs for the utilisation of the public power transmission and distribution networks, defined by decree no 2002-1014 of 19 July 2002, will come into effect. A new contract for access to the transmission network has been drawn up in co-operation with the Energy Regulation Commission (CRE) so as to be able to include these new tariffs. This new contract also takes into account the expectations expressed by the users of the transmission network concerning the energy delivery agreement used since the coming into effect of the European Directive on the opening of the electricity market in February 1999. On 31 October 2002, RTE is publishing a new version of the contract for access to the Public Transmission Networks. This document reproduces the general conditions of this contract. It comprises the following parts: preamble; definitions; connection to the public transportation network; metering and deductions; subscribed power; development, exploitation and maintenance of facilities; power continuity and quality; liability; tariffing and conditions of payment; declaration of the balancing actor; general dispositions.

  9. 48 CFR 801.602-75 - Review requirements-OGC.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Review requirements-OGC... GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities 801.602-75 Review requirements—OGC. (a) Contracting officers must obtain...

  10. 41 CFR 51-5.2 - Mandatory source requirement.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Mandatory source requirement. 51-5.2 Section 51-5.2 Public Contracts and Property Management Other Provisions Relating to... such as the Defense Logistics Agency and the General Services Administration, and certain commercial...

  11. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  12. Choreography Synthesis as Contract Agreement

    Directory of Open Access Journals (Sweden)

    Julien Lange

    2013-10-01

    Full Text Available We propose a formal model for distributed systems, where each participant advertises its requirements and obligations as behavioural contracts, and where multiparty sessions are started when a set of contracts allows to synthesise a choreography. Our framework is based on the CO2 calculus for contract-oriented computing, and borrows concepts and results from the session type literature. It supports sessions where the number of participants is not determined beforehand, and keeps CO2's ability to rule out participants that are culpable if contracts are not fulfilled at runtime. We show that we have progress and session fidelity in CO2, as a result of the honesty of participants — i.e., their ability to always adhere to their contracts.

  13. International contracts within the business of MSMEs

    Directory of Open Access Journals (Sweden)

    Martha Cecilia López Fonseca

    2012-07-01

    Full Text Available The purpose is to explain, in general terms, some of the possibilities for micro, small and medium enterprises (MSMEs to internationalize, taking into consideration, among other aspects, the elaboration of the contract, preferably written. The meaning of international trade comes from the mercantilist, classical and neoclassical currents and from contemporary postulates, such as the theory of competitive advantage, which demonstrate the importance of the exchange of goods and services for economies. International trade relations of any company are based on requirements of importing or exporting raw materials, machinery, final and intermediate goods or services procurement. However, in practice, relations can cover a wider spectrum than the abovementioned operations. This essay mentions some elements that should be considered by the parties when making the negotiation and which will be reflected in the body of the contract.

  14. 41 CFR 105-74.115 - Does this part affect the Federal contracts that I receive?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does this part affect... Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General Services Administration 74-GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE...

  15. Food and drink serving contract

    Directory of Open Access Journals (Sweden)

    Veselinović Janko

    2012-01-01

    Full Text Available Food and drink catering service is almost as old as the civilization itself. Even though this vocation is a part of the catering activity, Serbian law does not foresee this contract section as personalized. Key legal sources for this kind of contract are business customs. Food and drink serving contract is a mixed-type contract and its legal nature is very interesting due to its complexity. Specific for this contract is the fact that it is not an ordinary service, but also an activity which requires a degree of culinary skills, knowledge of customs of other nations, as well as other skills. The very category of a good professional in business economy / hospitality industry is very dynamic, as it needs to be evaluated according to all given circumstances, which may be rather unpredictable. By considering the legal nature, but also the rights and obligations of the contracting parties, we tried to point to the questions that require a special attention. Legal sources that indirectly refer to food and drink serving contracts were taken into account. Apart from the Law on Obligatory Relations, we also considered here the Law on Tourism also pointing to the comparative law and jurisprudence.

  16. What constitutes the gas sales contract in the evolving marketplace?

    International Nuclear Information System (INIS)

    Hughes, T.M.

    1996-01-01

    A general overview of certain fundamental issues of contract law, which are relevant to gas sales transactions, was presented. Since deregulation, parties of the Canadian natural gas market are free to negotiate the terms of arrangements and contracts with any number of buyers and sellers. With deregulation also came a substantial increase in the amount of litigation regarding sales contracts. Two basic issues that should be kept in mind when negotiating any gas sales contract were letter agreements, (two versions of non-binding letters of intent), and requirement of writing. Within the requirements of writing one should be mindful of the legal implications of the fraud statutes, the Sale of Goods Act, what constitutes a sufficient note or memorandum, what constitutes the requisite signature, contracting out of the requirement of writing and signature on the mass agreement, certainty of terms, and the terms implied by legislation. It was considered advantageous for both buyers and sellers to continue to be vigilant about the contractual arrangements respecting all of their gas transactions

  17. Radiation sterilisation - a contract steriliser's view

    International Nuclear Information System (INIS)

    Woolston, J.

    1995-01-01

    Radiation processing is based on two characteristics of high energy radiations namely their ability to kill micro-organisms and their ability to modify polymer structure. Contract radiation plants are particularly prominent in the application of radiation processing, accounting for approx. 33% of gamma plants world wide and over 50% of installed Cobalt 60. Amongst contract radiation plants Globally sterilisation will account for some 70-80% of gamma plant revenues with 20-30% being associated with other microbiological control activities. Individual plants however will show significant variation. Total volumes of sterile product generated by contract gamma plants are estimated at approx. 1.5-2.0 m3 per annum. Chemical modification generally forms a small proportion of their activity in value or volume terms although the high dosages generally required for polymer modification may result in a larger proportion of process time. Non-sterilisation irradiation services based on microbiological control are provided for a variety of industries particularly pharmaceutical raw material, food packaging and pharmaceutical packaging and food itself. (author)

  18. Should excessive worry be required for a diagnosis of generalized anxiety disorder? Results from the US National Comorbidity Survey Replication.

    Science.gov (United States)

    Ruscio, Ayelet Meron; Lane, Michael; Roy-Byrne, Peter; Stang, Paul E; Stein, Dan J; Wittchen, Hans-Ulrich; Kessler, Ronald C

    2005-12-01

    Excessive worry is required by DSM-IV, but not ICD-10, for a diagnosis of generalized anxiety disorder (GAD). No large-scale epidemiological study has ever examined the implications of this requirement for estimates of prevalence, severity, or correlates of GAD. Data were analyzed from the US National Comorbidity Survey Replication, a nationally representative, face-to-face survey of adults in the USA household population that was fielded in 2001-2003. DSM-IV GAD was assessed with Version 3.0 of the WHO Composite International Diagnostic Interview. Non-excessive worriers meeting all other DSM-IV criteria for GAD were compared with respondents who met full GAD criteria as well as with other survey respondents to consider the implications of removing the excessiveness requirement. The estimated lifetime prevalence of GAD increases by approximately 40% when the excessiveness requirement is removed. Excessive GAD begins earlier in life, has a more chronic course, and is associated with greater symptom severity and psychiatric co-morbidity than non-excessive GAD. However, non-excessive cases nonetheless evidence substantial persistence and impairment of GAD, high rates of treatment-seeking, and significantly elevated co-morbidity compared with respondents without GAD. Non-excessive cases also have sociodemographic characteristics and familial aggregation of GAD comparable to excessive cases. Individuals who meet all criteria for GAD other than excessiveness have a somewhat milder presentation than those with excessive worry, yet resemble excessive worriers in a number of important ways. These findings challenge the validity of the excessiveness requirement and highlight the need for further research into the optimal definition of GAD.

  19. Game-Theoretic Models for Usage-based Maintenance Contract

    Science.gov (United States)

    Husniah, H.; Wangsaputra, R.; Cakravastia, A.; Iskandar, B. P.

    2018-03-01

    A usage-based maintenance contracts with coordination and non coordination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers service contract to the owner of the truck after warranty ends. This contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the owner will be charged an additional cost. In general, the agent (Original Equipment Manufacturer/OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. The decision problem for the owner is to select the best option offered that fits to its requirement, and the decision problem for the agent is to find the optimal maintenance efforts for a given price of the service option offered. We first find the optimal decisions using coordination scheme and then with non coordination scheme for both parties.

  20. 7 CFR 400.208 - Term of the contract.

    Science.gov (United States)

    2010-01-01

    ... writing to the other party that the contract is not to be renewed. Any breach of the contract, or failure... 7 Agriculture 6 2010-01-01 2010-01-01 false Term of the contract. 400.208 Section 400.208..., DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE REGULATIONS Agency Sales and Service Contract-Standards for...

  1. 48 CFR 4.101 - Contracting officer's signature.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contracting officer's signature. 4.101 Section 4.101 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Contract Execution 4.101 Contracting officer's signature. Only contracting officers shall...

  2. 17 CFR 41.2 - Required records.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Required records. 41.2 Section 41.2 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION SECURITY FUTURES PRODUCTS General Provisions § 41.2 Required records. A designated contract market or registered derivatives...

  3. Analysis of Developed Country's Export Contract and Contract Risk and Development of Sample Contract and Guide

    International Nuclear Information System (INIS)

    Lee, D. S.; Oh, K. B.; Chung, W. S.; Lee, K. S.; Yun, S. W.; Lee, J. H.; Lee, B. W.; Kim, H. J.; Yang, M. H.

    2008-10-01

    This paper aimed at developing legal support for the non nuclear power plant industry's export. This study aids establishing government policy and promoting export of non nuclear power plant industry. This paper treated analysis of contractual risk and caution before entering into contract. To promote continuing export result, governmental and legal aids and guide will be required continuously. This study showed risks related with export contract and explained export control acts and procedures

  4. CONTRACT FOLLOW UP TRAINING

    CERN Multimedia

    Technical Training; Tel. 74460

    2001-01-01

    SPL is organizing Training Sessions on the Contract Follow Up application. CFU is a Web based tool, developped and supported by the Administrative Information Services. It allows the creation of Divisional Requests and the follow up of their processing, from the Market Survey to the Invitation to Tender or Price Enquiry, approval by the Finance Committee, up to the actual signature of a Contract, acccording to the CERN Purchasing procedures. It includes a document management component. It also provides link with other AIS applications such as BHT and EDH. The course is primarily intended for DPOs, Contract Technical responsibles in the division and their assistants, but is beneficial to anybody involved in the follow up of such Purchasing Procedures. This course is free of charge, but application is necessary. The details of the course may be found at http://training.web.cern.ch/Training/ENSTEC/P2001/Bureautique/cfu4_f.htm General information of CFU may be found at http://ais.cern.ch/apps/cfu/ The dates of t...

  5. Next Indefinite Contract review exercise

    CERN Multimedia

    2013-01-01

    Dear Colleagues, We are pleased to inform you that the 2013 LD2IC exercise (selection process for the conversion of limited-duration contracts to indefinite contracts) was officially launched last week.  The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 9 August 2013 for a period of four weeks (until 8 September 2013). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: Information on the location of these sessions will be provided in due course on the CERN announcements page. HR Department

  6. An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives

    Science.gov (United States)

    2016-09-01

    TO CONTRACTING OFFICER’S REPRESENTATIVES September 2016 By: Tanya V. Peel Angel R. Acevedo Advisors : Karen Landale Matthew Kremer...among contracting personnel and CORs requires improvement, staff levels need to be increased to support contract administration, managers nominate CORs...Landale, Lead Advisor Matthew Kremer, Support Advisor Brad Naegle Academic Associate Graduate School of Business and Public

  7. Contractions from grading

    Science.gov (United States)

    Krishnan, Chethan; Raju, Avinash

    2018-04-01

    We note that large classes of contractions of algebras that arise in physics can be understood purely algebraically via identifying appropriate Zm-gradings (and their generalizations) on the parent algebra. This includes various types of flat space/Carroll limits of finite and infinite dimensional (A)dS algebras, as well as Galilean and Galilean conformal algebras. Our observations can be regarded as providing a natural context for the Grassmann approach of Krishnan et al. [J. High Energy Phys. 2014(3), 36]. We also introduce a related notion, which we call partial grading, that arises naturally in this context.

  8. Exit from contract

    Directory of Open Access Journals (Sweden)

    Oren Bar-Gill

    2016-01-01

    Full Text Available Objective to study the procedure of exiting the contract its costs and benefits. Methods statistical method comparative analysis. Results free exit from contract is one of the most powerful tools for the consumer rights protection. The procedure frees consumers from bad deals and keeps businesses honest. Yet consumers often choose transactions with lockin provisions trading off exit rights for other perks. This article examines the costs and benefits of free exit as compared to the lockin alternative. According to the authors the present regulation of exit penalties in the USA is poorly tailored to address concerns about lockin particularly in light of increasingly ubiquitous marketbased solutions. The article also calls regulatory attention to loyalty rewards which are shown to be as powerful as exit penalties and equally detrimental. Scientific novelty the article reveals a paradoxical state of the law exit regulations in the USA are used most where they are needed least. Termination penalties present an obvishyous target for regulatory intervention while loyalty programs seem benign not warranting any regulatory attention. Practical significance the article is of interest for the Russian juridical science and lawmaking authorities as in Russia the issue of exiting the contract is as topical as in the USA and requires solution which would impair neither the rights of consumers nor the rights of the sellers ofnbspproducts and services. nbsp

  9. 24 CFR 891.590 - Notice upon HAP contract expiration.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Notice upon HAP contract expiration... Handicapped-Section 8 Assistance § 891.590 Notice upon HAP contract expiration. (a) Notice required. The HAP contract will provide that the Borrower will, at least one year before the end of the HAP contract term...

  10. 48 CFR 970.1103-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1103... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1103-4 Contract clause. Insert the clause at 48 CFR 52.211-5, Material Requirements, in solicitations and contracts. ...

  11. 48 CFR 970.0808-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0808... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Required sources of supplies and services 970.0808-3 Contract clause. The contracting officer shall insert the clause at 970.5208-1, Printing, in all...

  12. 76 FR 2035 - Procedures for Protests and Contracts Dispute

    Science.gov (United States)

    2011-01-12

    ... an alleged breach of that contract. A contract dispute does not require, as a prerequisite, the...-0840; Notice No. 10-18] RIN 2120-AJ82 Procedures for Protests and Contracts Dispute AGENCY: Federal... brought against the FAA and contract disputes brought against or by the FAA. It would also add a voluntary...

  13. 76 FR 55217 - Procedures for Protests and Contracts Dispute

    Science.gov (United States)

    2011-09-07

    ... an alleged breach of that contract. A contract dispute does not require, as a prerequisite, the...-0840; Amdt. No. 17-1] RIN 2120-AJ82 Procedures for Protests and Contracts Dispute AGENCY: Federal... contract disputes brought against or by the FAA. It also adds a voluntary dispute avoidance and early...

  14. 48 CFR 32.501-3 - Contract price.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract price. 32.501-3... REQUIREMENTS CONTRACT FINANCING Progress Payments Based on Costs 32.501-3 Contract price. (a) For the purpose of making progress payments and determining the limitation on progress payments, the contract price...

  15. 48 CFR 432.007 - Contract financing payments.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING 432.007 Contract financing payments. The HCA may prescribe, on a case-by-case basis, a shorter period for financing payments. [61 FR 53646, Oct. 15, 1996. Redesignated...

  16. 48 CFR 2832.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Unusual contract financing... Contracting Requirements CONTRACT FINANCING Non-Commercial Item Purchase Financing 2832.114 Unusual contract financing. The HCA, or designee at a level not lower than the BPC, is the official authorized to approve...

  17. 48 CFR 46.202-1 - Contracts for commercial items.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contracts for commercial... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-1 Contracts for commercial items. When acquiring commercial items (see part 12), the Government shall rely on contractors' existing...

  18. 48 CFR 19.806 - Pricing the 8(a) contract.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Pricing the 8(a) contract...) Program) 19.806 Pricing the 8(a) contract. (a) The contracting officer shall price the 8(a) contract in accordance with subpart 15.4. If required by subpart 15.4, the SBA shall obtain certified cost or pricing...

  19. Between Status and Contract?

    Directory of Open Access Journals (Sweden)

    Thorsten Keiser

    2013-01-01

    Full Text Available This contribution deals with unfree labour in Germany from the early modern age until the beginning of the 20th century. It presents the main conclusions of a book published in 2013 on this subject in German. Unfree labour is not identified in the first place with slavery or any other labour relationship based on status. Instead, this study aims at an analysis of freedom and coercion in contractual labour relationships. It will be argued that in Germany contractual labour relationships before 1800 were embedded in a legal system that strongly restricted contractual autonomy and aimed at the suppression of free labour markets. The scope of this legislation was to guarantee efficient labour performance, which was not only perceived as being in the personal interest of an employer, but as a fundamental element of the common good. After 1800 the system changed to more incentive-based legislation that established freedom of contract for labour relations. Nevertheless, coercion in order to perform the contractual duties of a work contract remained important for many groups of workers, especially farmhands and industrial workers. The last criminal sanctions for breaches of labour contracts were only abolished in the revolution of 1919. This development shows the difficulties German law had in extending the principles of private law to workers. When a system of free labour was fully established, the issue of unemployment and economic problems, especially in the Weimar Republic, required a new system of protective rules. The history of free market based labour contracts in Germany was therefore very short, with state intervention shi ing from control and coercion to social assistance.

  20. Housing and bed and board contract

    Directory of Open Access Journals (Sweden)

    Veselinović Janko

    2011-01-01

    Full Text Available In this work not only legal nature of catering services is analyzed, but also legal position of parties in it. Catering contract (Housing and Bed and Board Contract is unnamed in our country and the main source of law for this contract are business practices and usage. A lot of attention is paid to this question. Lack of legal norms for this area is general characteristic for most of the tourism contracts. In this contract its title is also debatable because term 'catering services' is not usually used in practice. Although this contract is unnamed in Comparative Law ,in tourist more developed countries there are more codified business practices from this area and there is more Case Law. Having in mind development of tourist economy adequate legal conditions in tourism contract are expected.

  1. Duration and extension of scope contracts with public entities

    Directory of Open Access Journals (Sweden)

    Kristian Rodrigo Pscheidt

    2016-12-01

    Full Text Available Brazilian Government is guided by the principles of legality and effectiveness. For example, there are the administrative contracts and tender procedures, according to the provisions of Law n. 8.666/1993. It happens that there is legislative omission about the scope contracts, in particular regarding the validity period and renovation. In this vacuum, Tribunals has followed the guidance of the Union General Attorney, which requires new bidding process whenever expires the contract. But that guidance can not be followed without restriction, under penalty of violation of effectiveness indicated in Article 37 of the Constitution. This occurs, for example, in hiring law firms and accounting advice in scope, with fees tied to the success.

  2. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Science.gov (United States)

    2010-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  3. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    International Nuclear Information System (INIS)

    Lee, Myung Ho; Lee, Eui Jin

    2010-01-01

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  4. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Myung Ho; Lee, Eui Jin [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2010-10-15

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  5. The Inclusion of Standard Terms in International Sales Contracts

    Directory of Open Access Journals (Sweden)

    S Eiselen

    2011-04-01

    Full Text Available The problem dealing with the inclusion of standard terms and conditions in contracts is a problem that has engaged most legal systems. The United Nations Convention on Contracts for the International Sale of Goods, Vienna 1980 (CISG does not expressly deal with this problem. Accordingly the solution to the issue must be found in an interpretation and application of the general principles found in articles 8, 14 and 18. One of the main objects of the CISG is the harmonisation of international trade law. It is generally recognised that in order to achieve harmonisation it isnecessary that courts should interpret and apply the convention in a consistent and harmonious manner. Unfortunately a number of approaches have emerged from courts around the world in regard to the inclusion of standard terms. German courts have developed a strict approach which requires that the standard terms be madeavailable to the addressee at the time of the conclusion of the contract. They also require that the standard terms be couched in the language of the main contract. In stark contrast an American court has used an approach which is very lax in regard to incorporation, even allowing incorporation after the conclusion of the contract. There is, however a more moderate approach set out in decisions of the Austrian Supreme Court where the court adopted an approach which is more akin to that found in most legal systems, namely that a clear incorporation clause in the contract is sufficient for the effective incorporation of standard terms. The author critically examines the case law, the various approaches and the underlying arguments on which they are based, before reaching the conclusion that the two extreme approaches should be rejected in favour of the more moderate approach. This approach is founded on aproper interpretation of the provisions of the CISG as well as being in step with international trade practice.

  6. Increased muscle glucose uptake during contractions

    DEFF Research Database (Denmark)

    Ploug, Thorkil; Galbo, Henrik; Richter, Erik

    1984-01-01

    We reinvestigated the prevailing concept that muscle contractions only elicit increased muscle glucose uptake in the presence of a so-called "permissive" concentration of insulin (Berger et al., Biochem. J. 146: 231-238, 1975; Vranic and Berger, Diabetes 28: 147-163, 1979). Hindquarters from rats...... in severe ketoacidosis were perfused with a perfusate containing insulin antiserum. After 60 min perfusion, electrical stimulation increased glucose uptake of the contracting muscles fivefold. Also, subsequent contractions increased glucose uptake in hindquarters from nondiabetic rats perfused for 1.5 h......-methylglucose uptake increased during contractions and glucose uptake was negative at rest and zero during contractions. An increase in muscle transport and uptake of glucose during contractions does not require the presence of insulin. Furthermore, glucose transport in contracting muscle may only increase if glycogen...

  7. 48 CFR 849.111-70 - Required review.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Required review. 849.111... MANAGEMENT TERMINATION OF CONTRACTS General Principles 849.111-70 Required review. (a) FAR 49.111 requires each agency to establish procedures, when necessary, for the administrative review of proposed...

  8. 48 CFR 804.101 - Contracting officer's signature.

    Science.gov (United States)

    2010-10-01

    ... signature. 804.101 Section 804.101 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL ADMINISTRATIVE MATTERS Contract Execution 804.101 Contracting officer's signature. (a) If a... signature. ...

  9. 12 CFR 404.22 - Government contracts.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Government contracts. 404.22 Section 404.22 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES INFORMATION DISCLOSURE Access to Records Under the Privacy Act of 1974 § 404.22 Government contracts. (a) Approval by Assistant General Counsel for...

  10. 48 CFR 203.1004 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... OF DEFENSE GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Contractor Code of Business Ethics and Conduct 203.1004 Contract clauses. (a) Use the clause at 252.203-7003 in solicitations and contracts that include the FAR clause 52.203-13, Contractor Code of Business Ethics and Conduct...

  11. Future Contract Selection by Term Structure Analysis

    Directory of Open Access Journals (Sweden)

    Vasco Grossmann

    2017-07-01

    Full Text Available In futures markets, a single asset is generally represented by several contracts with different maturities. The selection of specific contracts is an inevitable task that also creates new opportunities, especially in terms of speculative trading. Evaluating immediate and upcoming trading costs for all considered contracts might lead to a significantly improved performance. Among that, even possible market inefficiencies might be taken into consideration. This research introduces and evaluates a new algorithm for the contract selection. The results are benchmarked and compared with established methods using a Monte Carlo simulation on different commodity and index futures.

  12. 75 FR 39034 - Public Housing Annual Contributions Contract

    Science.gov (United States)

    2010-07-07

    ... Contributions Contract AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The... Contributions Contract (ACC) with certain requirements applicable to all project and other requirements... Contributions Contract. OMB Approval Number: 2577-New. Form Numbers: Certain information collections do not have...

  13. Reviving Ulysses contracts.

    Science.gov (United States)

    Spellecy, Ryan

    2003-12-01

    Ulysses contracts have faced paternalism objections since they first were proposed. Since the contracts are designed to override a present request from a legally competent patient in favor of a past request made by that patient, enforcement of these contracts was argued to be unjustifiable strong paternalism. Recent legal developments and new theories of practical reasoning suggest that the discussion of Ulysses contracts should be revived. This paper argues that with a proper understanding of the future-directed planning embodied in Ulysses contracts, the charge of strong paternalism can be answered, and the enforcement of some Ulysses contracts may be justified under the rubric of weak paternalism.

  14. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  15. Contract portfolio optimization for a gasoline supply chain

    Science.gov (United States)

    Wang, Shanshan

    Major oil companies sell gasoline through three channels of trade: branded (associated with long-term contracts), unbranded (associated with short-term contracts), and spot market. The branded channel provides them with a long-term secured and sustainable demand source, but requires an inflexible long-term commitment with demand and price risks. The unbranded channel provides a medium level of allocation flexibility. The spot market provides them with the greatest allocation flexibility to the changing market conditions, but the spot market's illiquidity mitigates this benefit. In order to sell the product in a profitable and sustainable way, they need an optimal contract portfolio. This dissertation addresses the contract portfolio optimization problem from different perspectives (retrospective view and forward-looking view) at different levels (strategic level, tactical level and operational level). The objective of the retrospective operational model is to develop a financial case to estimate the business value of having a dynamic optimization model and quantify the opportunity values missed in the past. This model proves the financial significance of the problem and provides top management valuable insights into the business. BP has applied the insights and principles gained from this work and implemented the model to the entire Midwest gasoline supply chain to retrospectively review optimization opportunities. The strategic model is the most parsimonious model that captures the essential economic tradeoffs among different contract types, to demonstrate the need for a contract portfolio and what drives the portfolio. We examine the properties of the optimal contract portfolio and provide a comparative statics analysis by changing the model parameters. As the strategic model encapsulates the business problem at the macroscopic level, the tactical model resolves lower level issues. It considers the time dynamics, the information flow and contracting flow. Using

  16. 48 CFR 7.104 - General procedures.

    Science.gov (United States)

    2010-10-01

    ..., since it generally restricts competition and increases prices. Early in the planning process, the planner should consult with requirements and logistics personnel who determine type, quality, quantity... competition when awarding a contract, the plan shall also be coordinated with the cognizant competition...

  17. 48 CFR 225.7403-1 - General.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Defense Contractors Outside the United States 225.7403-1 General. Information and guidance pertaining to DoD antiterrorism/force protection policy for contracts that require performance or travel outside the United States can be obtained from...

  18. 48 CFR 339.7103 - Solicitation and contract clause.

    Science.gov (United States)

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Information Security Management...-72, Security Requirements for Federal Information Technology Resources, in solicitations and contracts that involve contractor access to Federal information or Federal information systems. ...

  19. The general transcriptional repressor Tup1 is required for dimorphism and virulence in a fungal plant pathogen.

    Directory of Open Access Journals (Sweden)

    Alberto Elías-Villalobos

    2011-09-01

    Full Text Available A critical step in the life cycle of many fungal pathogens is the transition between yeast-like growth and the formation of filamentous structures, a process known as dimorphism. This morphological shift, typically triggered by multiple environmental signals, is tightly controlled by complex genetic pathways to ensure successful pathogenic development. In animal pathogenic fungi, one of the best known regulators of dimorphism is the general transcriptional repressor, Tup1. However, the role of Tup1 in fungal dimorphism is completely unknown in plant pathogens. Here we show that Tup1 plays a key role in orchestrating the yeast to hypha transition in the maize pathogen Ustilago maydis. Deletion of the tup1 gene causes a drastic reduction in the mating and filamentation capacity of the fungus, in turn leading to a reduced virulence phenotype. In U. maydis, these processes are controlled by the a and b mating-type loci, whose expression depends on the Prf1 transcription factor. Interestingly, Δtup1 strains show a critical reduction in the expression of prf1 and that of Prf1 target genes at both loci. Moreover, we observed that Tup1 appears to regulate Prf1 activity by controlling the expression of the prf1 transcriptional activators, rop1 and hap2. Additionally, we describe a putative novel prf1 repressor, named Pac2, which seems to be an important target of Tup1 in the control of dimorphism and virulence. Furthermore, we show that Tup1 is required for full pathogenic development since tup1 deletion mutants are unable to complete the sexual cycle. Our findings establish Tup1 as a key factor coordinating dimorphism in the phytopathogen U. maydis and support a conserved role for Tup1 in the control of hypha-specific genes among animal and plant fungal pathogens.

  20. 48 CFR 908.1104 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 908.1104 Section 908.1104 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Leasing of Motor Vehicles 908.1104 Contract clauses. (f...