  1. 78 FR 38309 - Northern Natural Gas Company; Southern Natural Gas Company, L.L.C.; Florida Gas Transmission...

    Science.gov (United States)

    2013-06-26

    ... Natural Gas Company; Southern Natural Gas Company, L.L.C.; Florida Gas Transmission Company, LLC; Notice of Application Take notice that on June 4, 2013, Northern Natural Gas Company (Northern), 1111 South 103rd Street, Omaha, Nebraska 68124; on behalf of itself, Southern Natural Gas Company, L.L.C., and...

  2. 77 FR 58126 - Columbia Gas Transmission, LLC; Notice of Offer of Settlement

    Science.gov (United States)

    2012-09-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP12-1021-000] Columbia Gas Transmission, LLC; Notice of Offer of Settlement Take notice that on September 4, 2012, Columbia Gas Transmission, LLC (Columbia) filed a Stipulation and Agreement (Settlement), including pro forma tariff records...

  3. 75 FR 42432 - Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC...

    Science.gov (United States)

    2010-07-21

    ... Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC, Transcontinental... abandonment of facilities by Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas... resources, fisheries, and wetlands; Cultural resources; Vegetation and wildlife; Endangered and threatened...

  4. 75 FR 13524 - Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC...

    Science.gov (United States)

    2010-03-22

    ... Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC, Transcontinental... notice that on March 5, 2010, Northern Natural Gas Company (Northern Natural), 1111 South 103rd Street, Omaha, Nebraska 68124- 1000, filed on behalf of itself and other owners, Southern Natural Gas Company...

  5. 77 FR 32628 - Columbia Gas Transmission, LLC; Notice of Environmental Onsite Review

    Science.gov (United States)

    2012-06-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-6-000] Columbia Gas Transmission, LLC; Notice of Environmental Onsite Review On June 13 and 14, 2012, the Office of Energy Projects (OEP) staff will conduct site visits of the proposed Line MB Loop Extension Project. The purpose of the onsite review is to review...

  6. 77 FR 59608 - Gas Transmission Northwest LLC; Notice of Petition for Declaratory Order

    Science.gov (United States)

    2012-09-28

    ... Transmission Northwest LLC; Notice of Petition for Declaratory Order Take notice that on September 18, 2012... natural gas GTN transports on its system must be ``entirely free'' of compressor oil. Any person desiring... the appropriate link in the above list. They are also available for review in the Commission's Public...

  7. 77 FR 73646 - Essar Steel Minnesota, LLC v. Great Lakes Gas Transmission Limited Partnership; Notice of Complaint

    Science.gov (United States)

    2012-12-11

    ... Transmission Limited Partnership (Respondent), alleging that the Respondent has failed to comply with the... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP13-313-000] Essar Steel Minnesota, LLC v. Great Lakes Gas Transmission Limited Partnership; Notice of Complaint Take notice that on...

  8. 78 FR 57626 - Algonquin Gas Transmission, LLC; Notice of Intent To Prepare An Environmental Impact Statement...

    Science.gov (United States)

    2013-09-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-16-000] Algonquin Gas Transmission, LLC; Notice of Intent To Prepare An Environmental Impact Statement for the Planned Algonquin Incremental Market Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy...

  9. 76 FR 35884 - Gas Transmission Northwest LLC; Notice of Intent To Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2011-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-5-000] Gas Transmission Northwest LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Carty Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission ...

  10. 78 FR 35627 - Columbia Gas Transmission, LLC; Notice of Intent To Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2013-06-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-7-000] Columbia Gas Transmission, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned East Side Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory...

  11. 78 FR 26350 - Columbia Gas Transmission, LLC; Notice of Intent To Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2013-05-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13-125-000] Columbia Gas Transmission, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Giles County Project, Request for Comments on Environmental Issues, and Notice of Environmental Site Review The staff of the Federal Energy Regulatory...

  12. 78 FR 41393 - Columbia Gas Transmission, LLC: Notice of Intent To Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2013-07-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13-478-000] Columbia Gas Transmission, LLC: Notice of Intent To Prepare an Environmental Assessment for the Proposed Line 1570 Project Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission ...

  13. 76 FR 12955 - CenterPoint Energy Gas Transmission Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2011-03-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-78-000] CenterPoint Energy Gas Transmission Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Line AM- 46 Replacement Project, Request for Comments on Environmental Issues, and Notice of Onsite Environmental Review The staff of the...

  14. 77 FR 24193 - Columbia Gas Transmission, LLC; Notice of Intent to Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2012-04-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-6-000] Columbia Gas Transmission, LLC; Notice of Intent to Prepare an Environmental Assessment for the Planned Line MB Loop Extension Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory...

  15. 77 FR 34031 - Petal Gas Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-06-08

    ... Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Application Take notice that on May 21, 2012, Petal Gas Storage, L.L.C. (Petal) and Hattiesburg Industrial Gas Sales, L.L.C. (Hattiesburg... pursuant to sections 7(c) and 7(b) of the Natural Gas Act (NGA), for authorization for Petal to acquire the...

  16. 75 FR 81264 - Critical Path Transmission, LLC; Clear Power, LLC; v. California Independent System Operator, Inc...

    Science.gov (United States)

    2010-12-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-11-000] Critical Path Transmission, LLC; Clear Power, LLC; v. California Independent System Operator, Inc.; Notice of Complaint... and 306 of the Federal Power Act, 16 U.S.C. 824e and 825e (2006), Critical Path Transmission, LLC and...

  17. 77 FR 70434 - Petal Gas Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Offer of Settlement

    Science.gov (United States)

    2012-11-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-464-000] Petal Gas Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Offer of Settlement Take notice that on November 8, 2012, Petal Gas Storage, L.L.C. (Petal) and Hattiesburg Industrial Gas Sales, L.L.C...

  18. 76 FR 56428 - Southern Cross Transmission LLC; Pattern Power Marketing LLC; Notice of Filing

    Science.gov (United States)

    2011-09-13

    ... Transmission LLC; Pattern Power Marketing LLC; Notice of Filing Take notice that on September 6, 2011, pursuant... Marketing LLC (PPM) jointly filed an application requesting that the Commission direct (1) the City of... with any FERC Online service, please e-mail [email protected] , or call (866) 208-3676 (toll...

  19. 76 FR 36914 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Science.gov (United States)

    2011-06-23

    ... Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC... Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley... when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please...

  20. 76 FR 34692 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Science.gov (United States)

    2011-06-14

    ... Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC... Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC... notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service...

  1. 76 FR 36910 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Science.gov (United States)

    2011-06-23

    ... Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC... Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power [[Page... subscribed docket(s). For assistance with any FERC Online service, please e-mail [email protected

  2. 75 FR 26746 - ONEOK Westex Transmission, L.L.C.; Notice of Baseline Filing

    Science.gov (United States)

    2010-05-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-19-000] ONEOK Westex Transmission, L.L.C.; Notice of Baseline Filing May 5, 2010. Take notice that on April 29, 2010, ONEOK Westex Transmission, L.L.C. submitted its baseline filing of its Statement of Operating Conditions for transportation...

  3. 76 FR 79673 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2011-12-22

    ... Pipeline Company, L.L.C.; Notice of Application On December 9, 2011, Tennessee Gas Pipeline Company, L.L.C... (Commission) an application under section 7(c) of the Natural Gas Act (NGA), as amended, and part 157 of the... Rocan, Senior Counsel, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas...

  4. 78 FR 58529 - Floridian Natural Gas Storage Company, LLC; Notice of Application

    Science.gov (United States)

    2013-09-24

    ... Natural Gas Storage Company, LLC; Notice of Application Take notice that on September 4, 2013, Floridian Natural Gas Storage Company, LLC (Floridian Gas Storage), 1000 Louisiana Street, Suite 4361, Houston, Texas 77002, filed in Docket No. CP13-541-000 an application under section 7(c) of the Natural Gas Act...

  5. 77 FR 23472 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-04-19

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on April 4, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in the..., Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002...

  6. 78 FR 6313 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2013-01-30

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on January 14, 2013, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in... directed to Thomas G. Joyce, Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C. 1001 Louisiana...

  7. 77 FR 8247 - Tennessee Gas Pipeline Company, L.L.C. Notice of Application

    Science.gov (United States)

    2012-02-14

    ... Pipeline Company, L.L.C. Notice of Application Take notice that on February 2, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in Docket... Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420...

  8. 77 FR 68115 - Millennium Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-11-15

    ...] Millennium Pipeline Company, L.L.C.; Notice of Application Take notice that on November 1, 2012, Millennium Pipeline Company, L.L.C. (Millennium), One Blue Hill Plaza, Seventh Floor, P.O. Box 1565, Pearl River, New... system to the existing interconnection with Algonquin Gas Transmission, L.L.C. in Ramapo, New York and...

  9. 77 FR 51792 - Colorado Interstate Gas Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-08-27

    ... Interstate Gas Company, L.L.C.; Notice of Application Take notice that on August 7, 2012, Colorado Interstate Gas Company, L.L.C. (CIG), Post Office Box 1087, Colorado Springs, Colorado 80944, filed in the above captioned docket an application pursuant to section 7(c) of the Natural Gas Act (NGA) for a certificate of...

  10. 75 FR 8051 - Petal Gas Storage, L.L.C.; Notice of Application

    Science.gov (United States)

    2010-02-23

    ... Storage, L.L.C.; Notice of Application February 12, 2010. Take notice that on January 29, 2010, Petal Gas Storage, L.L.C. (Petal), 1100 Louisiana Street, Houston, Texas, 77002, filed with the Federal Energy Regulatory Commission an abbreviated application pursuant to section 7(c) of the Natural Gas Act (NGA), as...

  11. 76 FR 20657 - Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Filing

    Science.gov (United States)

    2011-04-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-102-001] Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Filing Take notice that on April 1, 2011, Hattiesburg Industrial Gas Sales, L.L.C. (Hattiesburg) filed a revised Statement of Operating Conditions to comply with a...

  12. 78 FR 21929 - Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Filing

    Science.gov (United States)

    2013-04-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR13-46-000] Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Filing Take notice that on April 1, 2013, Hattiesburg Industrial Gas Sales, L.L.C. (Hattiesburg) filed to cancel its Statement of Operating Conditions including its Tariff...

  13. 77 FR 24483 - Southern Natural Gas Company, L.L.C.; Notice of Filing

    Science.gov (United States)

    2012-04-24

    ... Natural Gas Company, L.L.C.; Notice of Filing Take notice that on April 5, 2012, Southern Natural Gas Company, L.L.C. (Southern), 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209, filed an... in Calhoun and Cleburne Counties, Alabama. Also, Southern, pursuant to Section 7(c) of the NGA...

  14. 75 FR 63452 - ONEOK Gas Storage, L.L.C.; Notice of Baseline Filing

    Science.gov (United States)

    2010-10-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR11-67-001] ONEOK Gas Storage, L.L.C.; Notice of Baseline Filing October 7, 2010. Take notice that on October 1, 2010, ONEOK Gas Storage, L.L.C. submitted a revised baseline filing of its Statement of Operating Conditions for services...

  15. 77 FR 64972 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-10-24

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on October 10, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in the above captioned docket an application pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA) for a...

  16. 76 FR 20973 - Northeast Transmission Development, LLC; Notice of Petition for Declaratory Order

    Science.gov (United States)

    2011-04-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-33-000] Northeast Transmission Development, LLC; Notice of Petition for Declaratory Order Take notice that on April 6, 2011... (Commission) Rules of Practice and Procedure, 18 CFR 385.207, and Order No. 679,\\2\\ Northeast Transmission...

  17. 77 FR 43277 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-07-24

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on July 6, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in the above referenced... Company, L.L.C. 1001 Louisiana Street, Houston, Texas 77002, or telephone (713) 420- 3299, or facsimile...

  18. 76 FR 78640 - Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Filing

    Science.gov (United States)

    2011-12-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PR12-8-000 and PR12-9-000] Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Filing Take notice that on December 9, 2011, Hattiesburg Industrial Gas Sales, L.L.C. (Hattiesburg) filed in PR12-8-000 a Statement of Operating Conditions (SOC) with...

  19. 75 FR 70350 - Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application

    Science.gov (United States)

    2010-11-17

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration [USCG-2010-0993] Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application AGENCY: Maritime Administration... announce they have received an application for the licensing of a natural gas deepwater port and the...

  20. 76 FR 4417 - Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application

    Science.gov (United States)

    2011-01-25

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration [USCG-2010-0993] Liberty Natural Gas LLC, Liberty Liquefied Natural Gas (LNG) Deepwater Port License Application AGENCY: Maritime Administration... application describes an offshore natural gas deepwater port facility that would be located approximately 16.2...

  1. 78 FR 4400 - Eni USA Gas Marketing LLC; Application for Blanket Authorization To Export Previously Imported...

    Science.gov (United States)

    2013-01-22

    ... in the business of purchasing and marketing supplies of LNG, and is a customer of the Cameron... DEPARTMENT OF ENERGY [FE Docket No. 12-161-LNG] Eni USA Gas Marketing LLC; Application for Blanket..., by Eni USA Gas Marketing LLC (Eni USA Gas Marketing), requesting blanket authorization to export...

  2. 77 FR 35669 - AltaGas Renewable Energy Colorado LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2012-06-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-1875-000] AltaGas Renewable Energy Colorado LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request... of AltaGas Renewable Energy Colorado LLC application for market-based rate authority, with an...

  3. 76 FR 46283 - Peoples Natural Gas Company LLC; Notice of Baseline Filing

    Science.gov (United States)

    2011-08-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR11-3-001] Peoples Natural Gas Company LLC; Notice of Baseline Filing Take notice that on July 20, 2011, Peoples Natural Gas... provided under Section 311 of the Natural Gas Policy Act of 1978 (NGPA). Any person desiring to participate...

  4. 75 FR 61478 - D'Lo Gas Storage, LLC; Notice of Petition

    Science.gov (United States)

    2010-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-504-000] D'Lo Gas Storage, LLC; Notice of Petition September 24, 2010. Take notice that on September 21, 2010, D'Lo Gas.... CP10-504-000, a petition for an Exemption of Temporary Acts and Operations and Request for Expedited...

  5. 76 FR 66054 - Southern Natural Gas Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2011-10-25

    ... Gas Company, L.L.C.; Notice of Application Take notice that on October 7, 2011, Southern Natural Gas... in Docket No. CP12-4-000 pursuant to section 7(b) of the Natural Gas Act and Part 157 of the... Glenn A. Sheffield, Director--Rates and Regulatory, Southern Natural Gas Company, P.O. Box 2563...

  6. 76 FR 28023 - Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2232-522; Project No. 516-459] Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings On March 18, 2011, the National Marine Fisheries Service (NMFS) requested a meeting with Duke Energy Carolinas, LLC...

  7. 78 FR 18968 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Science.gov (United States)

    2013-03-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13-97-000] Natural Gas Pipeline Company of America LLC; Notice of Application Take notice that on March 8, 2013, Natural Gas..., filed an application pursuant to section 7(c) of the Natural Gas Act and part 157 of the Commission's...

  8. 76 FR 62395 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Science.gov (United States)

    2011-10-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-547-000] Natural Gas Pipeline Company of America LLC; Notice of Application Take notice that on September 20, 2011, Natural Gas..., filed in Docket Number CP11-547-000, pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA), an...

  9. 75 FR 36376 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Science.gov (United States)

    2010-06-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-452-000] Natural Gas..., Natural Gas Pipeline Company of America LLC (Natural), 3250 Lacey Road, 7th Floor, Downers Grove, Illinois 60515-7918, filed in Docket Number CP10-452-000, pursuant to sections 7(b) and 7(c) of the Natural Gas...

  10. 78 FR 53749 - Gulf South Pipeline Company, LP, Petal Gas Storage, LLC; Notice of Availability of the...

    Science.gov (United States)

    2013-08-30

    ... Transmission Company, LLC's existing pipeline; and \\1\\ A ``pig'' is a tool that is inserted into and moves..., the EA is available for public viewing on the FERC's Web site ( www.ferc.gov ) using the eLibrary link... Commission's [[Page 53750

  11. Fiat Chrysler Application for Alternative Methodology for Off-Cycle Technology Credits: Engine and Transmission Warmup

    Science.gov (United States)

    FCA Group LLC request to the EPA regarding greenhouse gas, off-cycle CO2 credits for Active Engine Warm Up used in 2011-2013 model year vehicles and Active Transmission Warm Up Technologies used in 2013 model year vehicles.

  12. 78 FR 38024 - Magnolia LNG, LLC; Liquefied Natural Gas Limited; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2013-06-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-9-000] Magnolia LNG, LLC; Liquefied Natural Gas Limited; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Magnolia Liquefied Natural Gas Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of...

  13. 75 FR 65475 - Tallulah Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2010-10-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-494-000] Tallulah Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Tallulah Gas Storage Project, Request for Comments on Environmental Issues, and Notice of Onsite Environmental Review October 18, 2010. The staff of the Federal...

  14. 75 FR 26211 - Combined Notice of Filings

    Science.gov (United States)

    2010-05-11

    ...: 5 p.m. Eastern Time on Monday, May 10, 2010. Docket Numbers: RP10-653-000. Applicants: Discovery Gas Transmission LLC. Description: Discovery Gas Transmission LLC Cash-out Report for 2009. Filed Date: 04/27/2010... Pipeline Company of America LLC. Description: Natural Gas Pipeline Company of America LLC submits an...

  15. European standards applied by Gas Transmission System Operator

    International Nuclear Information System (INIS)

    Witek, M.; Kuchta, K.; Oleszkiewicz, J.; Teperek, T.

    2005-01-01

    The lecture described actual state of implementation of European standards concerning transmission of natural gas and underlined their importance for proper performance of Transmission System Operator (TSO). European standards implemented to Polish Standards as PN-EN, necessary for TSO, related to design, construction and operation of high pressure gas network were also described. The lecture underlined as well the impact of standards application on preparation process of national regulations. They obligate TSO to create the technical conditions that ensure safety of gas transmission network functioning as well as environmental and surroundings safety. (authors)

  16. 76 FR 62055 - Wabash Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2011-10-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-6-000] Wabash Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Wabash Gas Storage Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission ...

  17. Solutions to operate transmission and distribution gas networks

    Directory of Open Access Journals (Sweden)

    Neacsu Sorin

    2017-01-01

    Full Text Available In order to respect the actual and future regulations, besides SCADA, there is a need for further modern operating solutions for the transmission and distribution gas network. The paper presents the newest operating principles and modern software solutions that represent a considerable help to operate the transmission and distribution gas networks.

  18. 78 FR 33403 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2013-06-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-5-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Leidy Southeast Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal...

  19. 77 FR 59391 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-497-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assesment for the Proposed Brandywine Creek Replacement Project; Request for Comments on Environmental Issues; and Notice of Public Scoping Meeting The staff of the Federal...

  20. 75 FR 42738 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-16-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Mid-Atlantic Connector Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting July 15, 2010. The...

  1. 76 FR 40717 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2011-07-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-4-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Northeast Supply Link Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy...

  2. 77 FR 6793 - D'Lo Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the PROPOSED D...

    Science.gov (United States)

    2012-02-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-39-000] D'Lo Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the PROPOSED D'LO Gas Storage Project, Request for Comments on Environmental Issues, and Notice of Onsite Environmental Review The staff of the Federal Energy Regulatory Commission ...

  3. Polish Standard of the Technical Safety of Transmission Gas Pipelines

    International Nuclear Information System (INIS)

    Tkacz, A.J.

    2006-01-01

    The document is presenting the idea of the CNGI Norm called The Polish Standard of the Technical Safety of Transmission Gas Pipelines and the way of using it by companies associated in the Chamber of the Natural Gas Industry in the business activity. It will be applied to improve the quality and reliability of gas transmission after full opening of Polish natural gas market. (author)

  4. 78 FR 69660 - Association of Businesses Advocating Tariff Equity, Coalition of Miso Transmission Customers...

    Science.gov (United States)

    2013-11-20

    ... Businesses Advocating Tariff Equity, Coalition of Miso Transmission Customers, Illinois Industrial Energy... LLC, Duke Energy Business Services, LLC, Entergy Arkansas, Inc., Entergy Gulf States Louisiana, LLC....206 (2013), Association of Businesses Advocating Tariff Equity, Coalition of Miso Transmission...

  5. 77 FR 11527 - Bluewater Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2012-02-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-51-000] Bluewater Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed St. Clair River Crossing Replacement Project, Request for Comments on Environmental Issues, and Notice of Onsite Environmental Review The staff of the Federal...

  6. 77 FR 31347 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Availability of the Environmental Assessment...

    Science.gov (United States)

    2012-05-25

    ... environmental assessment (EA) for the MPP Project, proposed by Tennessee Gas Pipeline Company, L.L.C. (TGP) in the above-referenced docket. TGP requests authorization to construct and operate 7.9 miles of looped... connection with its evaluation of TGP's Clean Water Act (Section 404) permit application for the MPP Project...

  7. 75 FR 23263 - Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC...

    Science.gov (United States)

    2010-05-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-62-000] Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC; Alta Wind VI, LLC; Alta Wind VII, LLC; Alta Wind VIII, LLC; Alta Windpower Development, LLC; TGP Development Company, LLC...

  8. 77 FR 29633 - Alta Wind VII, LLC, Alta Wind IX, LLC, Alta Wind X, LLC, Alta Wind XI, LLC, Alta Wind XII, LLC...

    Science.gov (United States)

    2012-05-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-68-000] Alta Wind VII, LLC, Alta Wind IX, LLC, Alta Wind X, LLC, Alta Wind XI, LLC, Alta Wind XII, LLC, Alta Wind XIII, LLC, Alta Wind XIV, LLC, Alta Wind XV, LLC, Alta Windpower Development, LLC, TGP Development Company, LLC...

  9. 77 FR 32626 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Impact...

    Science.gov (United States)

    2012-06-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF09-8-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Rockaway Delivery Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federa...

  10. 76 FR 42704 - Sky River LLC; Notice of Filing

    Science.gov (United States)

    2011-07-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER11-3277-000; ER11-3277-001] Sky River LLC; Notice of Filing Take notice that, on July 8, 2011, Sky River LLC filed to amend its Open Access Transmission Tariff (OATT) filing, submitted on April 1, 2011 and amended on April 7...

  11. 76 FR 36526 - Columbia Gas Transmission, LLC; Notice of Application

    Science.gov (United States)

    2011-06-22

    ....47-mile of 20-inch pipeline to transport natural gas for Virginia Power Services Energy Corp., Inc...- fired electric generation facility being constructed by Virginia Electric and Power Company d/b/a... expects to complete the construction and place the electric generation facility in service during 2014...

  12. 78 FR 33400 - Columbia Gas Transmission, LLC; Notice of Application

    Science.gov (United States)

    2013-06-04

    ... Gas Act to construct, and operate a new 9,400 horsepower (hp) compressor station in Washington County, Pennsylvania (Redd Farm CS); two additional compressor units totaling 15,600 hp at its existing Glenville CS in Gilmer County, West Virginia; new station piping, control systems, and other appurtenant facilities at...

  13. 77 FR 27048 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Intent To Prepare an Environmental Assessment...

    Science.gov (United States)

    2012-05-08

    ... facilities by Tennessee Gas Pipeline Company, L.L.C. (TGP) in Lafourche Parish, Louisiana. The Commission... proposed project and encourage them to comment on their areas of concern. TGP provided landowners with a... the FERC Web site ( www.ferc.gov ). Summary of the Proposed Project TGP proposes to abandon in place...

  14. 75 FR 38805 - Central New York Oil and Gas Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2010-07-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-194-000] Central New York Oil and Gas Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed North-South Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting and Onsite Environmental Reviews June 24,...

  15. 76 FR 14652 - Port Barre Investments, L.L.C.; Notice of Application

    Science.gov (United States)

    2011-03-17

    ... Investments, L.L.C.; Notice of Application Take notice that on March 4, 2011, Port Barre Investments, L.L.C. (Bobcat) filed in Docket No. CP11-124-000 an application pursuant to section 7(c) of the Natural Gas Act... Investments, L.L.C., 126 FERC ] 61,240 (2009). \\2\\ Port Barre Investments, L.L.C., 130 FERC ] 62,272 (2010...

  16. Gas Transport Services. West European Gas Transmission Tariff Comparisons

    International Nuclear Information System (INIS)

    2006-07-01

    Since 1999, the Dutch gas transmission company, Gastransport Services (GTS), has commissioned an independent consultant to prepare reports comparing gas transportation tariffs across Western Europe on an annual basis. This report describes the tariffs in force at 1 February 2006. The previous report was published in May 2005, and reported on the tariffs which were in force at 1 January 2005. Since then several companies have published revised carriage arrangements, or have adjusted their tariffs (e.g. to reflect inflation, or for other reasons). In this report we compare the GTS tariff with the transportation tariffs in eleven other countries: Austria, Belgium, Denmark, France, Germany, Ireland, Italy, Luxembourg, Spain, Sweden, and the United Kingdom. This means that all West European countries with Third Party Access to gas transmission systems (except Finland) are covered in this report. In this main part of the report, we concentrate on showing charts which illustrate the comparisons of tariffs, at various distances, volumes and load factors. This gives an overall picture of the tariffs offered by each company, rather than concentrating on particular cases. The detailed calculations for each of the 45 cases are shown in the Appendix to this report, and the conclusions from the cases are shown in a colour-coded chart in the Summary and Conclusions.

  17. 77 FR 61597 - Avalon Wind, LLC; Avalon Wind 2, LLC; Catalina Solar, LLC; Catalina Solar 2, LLC; Pacific Wind...

    Science.gov (United States)

    2012-10-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-109-000] Avalon Wind, LLC; Avalon Wind 2, LLC; Catalina Solar, LLC; Catalina Solar 2, LLC; Pacific Wind Lessee, LLC; Pacific Wind 2, LLC; Valentine Solar, LLC; EDF Renewable Development, Inc.; Notice of Petition for Declaratory...

  18. 75 FR 63462 - Central New York Oil and Gas Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2010-10-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-480-000] Central New York Oil and Gas Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed MARC I Hub Line Project and Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting and Onsite Review September 22, 2010...

  19. Benchmarking European Gas Transmission System Operators

    DEFF Research Database (Denmark)

    Agrell, Per J.; Bogetoft, Peter; Trinkner, Urs

    This is the final report for the pan-European efficiency benchmarking of gas transmission system operations commissioned by the Netherlands Authority for Consumers and Markets (ACM), Den Haag, on behalf of the Council of European Energy Regulators (CEER) under the supervision of the authors....

  20. Guidelines for clockspeed acceleration in the US natural gas transmission industry

    International Nuclear Information System (INIS)

    Weijermars, Ruud

    2010-01-01

    This study presents the clockspeed analysis of a peer group comprising six major integrated US energy companies with substantial US interstate natural gas pipeline business activities: El Paso, Williams, NiSource, Kinder Morgan, MidAmerican and CMS Energy. For this peer group, the three clockspeed accelerators have been benchmarked at both corporate level and gas transmission business level, using time-series analysis and cross-sectional analysis over a 6-year period (2002-2007). The results are visualized in so-called clockspeed radargraphs. Overall corporate clockspeed winners - over the performance period studied - are: Williams, El Paso and Kinder Morgan; MidAmerican is a close follower. Corporate clockspeed laggards are: CMS Energy and NiSource. The peer group ranking for the natural gas transmission business segment shows similar clockspeed winners, but with different ranking in the following order: Kinder Morgan, MidAmerican and El Paso; Williams is a close follower. Clockspeed laggards for the natural gas transmission segments coincide with the corporate clockspeed laggards of the peer group: CMS Energy and NiSource (over the performance period studied); laggards of the past may become clockspeed leaders of the future if adjustments are made. Practical recommendations are formulated for achieving competitive clockspeed optimization in the US gas transmission industry as a whole. Recommendations for clockspeed acceleration at individual companies are also given. Although the US natural gas market is subject to specific regulations and its own geographical dynamics, this study also provides hints for improving the competitive clockspeed performance of gas transmission companies elsewhere, in other world regions. (author)

  1. Guidelines for clockspeed acceleration in the US natural gas transmission industry

    Energy Technology Data Exchange (ETDEWEB)

    Weijermars, Ruud [Department of Geotechnology, Delft University of Technology, PO Box 5048, 2600GA Delft (Netherlands)

    2010-08-15

    This study presents the clockspeed analysis of a peer group comprising six major integrated US energy companies with substantial US interstate natural gas pipeline business activities: El Paso, Williams, NiSource, Kinder Morgan, MidAmerican and CMS Energy. For this peer group, the three clockspeed accelerators have been benchmarked at both corporate level and gas transmission business level, using time-series analysis and cross-sectional analysis over a 6-year period (2002-2007). The results are visualized in so-called clockspeed radargraphs. Overall corporate clockspeed winners - over the performance period studied - are: Williams, El Paso and Kinder Morgan; MidAmerican is a close follower. Corporate clockspeed laggards are: CMS Energy and NiSource. The peer group ranking for the natural gas transmission business segment shows similar clockspeed winners, but with different ranking in the following order: Kinder Morgan, MidAmerican and El Paso; Williams is a close follower. Clockspeed laggards for the natural gas transmission segments coincide with the corporate clockspeed laggards of the peer group: CMS Energy and NiSource (over the performance period studied); laggards of the past may become clockspeed leaders of the future if adjustments are made. Practical recommendations are formulated for achieving competitive clockspeed optimization in the US gas transmission industry as a whole. Recommendations for clockspeed acceleration at individual companies are also given. Although the US natural gas market is subject to specific regulations and its own geographical dynamics, this study also provides hints for improving the competitive clockspeed performance of gas transmission companies elsewhere, in other world regions. (author)

  2. 75 FR 45623 - Morris Energy Group, LLC v.PSEG Energy Resources & Trade LLC; PSEG Fossil LLC; and PSEG Power LLC...

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-79-000] Morris Energy Group, LLC v.PSEG Energy Resources & Trade LLC; PSEG Fossil LLC; and PSEG Power LLC; Notice of Complaint...) filed a complaint against PSEG Energy Resources & Trade, LLC, PSEG Fossil LLC and PSEG Power LLC (PSEG...

  3. 77 FR 48138 - Topaz Solar Farms LLC; High Plains Ranch II, LLC; Bethel Wind Energy LLC; Rippey Wind Energy LLC...

    Science.gov (United States)

    2012-08-13

    ... Ranch II, LLC; Bethel Wind Energy LLC; Rippey Wind Energy LLC; Pacific Wind, LLC; Colorado Highlands Wind, LLC; Shooting Star Wind Project, LLC; Notice of Effectiveness of Exempt Wholesale Generator or... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG12-63-000; EG12-64-000...

  4. 76 FR 66053 - High Point Gas Transmission, LLC; Notice of Application

    Science.gov (United States)

    2011-10-25

    .... CP12-9-000 pursuant to section 7(c) of the Natural Gas Act and parts 157 and 284 of the Commission's...) approval of its pro forma tariff; and (4) waiver of the segmentation requirement, all as more fully set... other party in the proceeding. Only parties to the proceeding can ask for court review of Commission...

  5. 78 FR 3893 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2013-01-17

    ... any natural gas service; however, Columbia would terminate service to one free gas customer pursuant to the terms of the lease agreement between the customer and Columbia. Columbia estimates that it... contact FERC Online Support at FERC Online[email protected] or call toll-free at (866) 206-3676, or, for...

  6. 77 FR 58824 - Gulf Shore Energy Partners, LP; Notice of Intent To Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2012-09-24

    ... Transcontinental Gas Pipe Line Company, LLC (Transco) and Florida Gas Transmission Company, LLC (Florida Gas). The... natural gas from Transco to Florida Gas. The booster compressor station would boost the gas pressure by... wetlands; Cultural resources; Vegetation and wildlife; Air quality and noise; Endangered and threatened...

  7. 78 FR 32385 - Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC...

    Science.gov (United States)

    2013-05-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-64-000] Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC; Constellation NewEnergy...) Rules of Practice and Procedure, 18 CFR 385.207, Exelon Generation Company, LLC, CER Generation II, LLC...

  8. Natural gas supply in Denmark - A model of natural gas transmission and the liberalized gas market

    International Nuclear Information System (INIS)

    Bregnbaek, L.

    2005-01-01

    In the wake of the liberalization of European energy markets a large area of research has spawned. This area includes the development of mathematical models to analyze the impact of liberalization with respect to efficiency, supply security and environment, to name but a few subjects. This project describes the development of such a model. In Denmark the parallel liberalization of the markets of natural gas and electricity and the existence of an abundance of de-centralized combined heat and power generators of which most are natural gas fired, leads to the natural assumption that the future holds a greater deal of interdependency for these markets. A model is developed describing network flows in the natural gas transmission system, the main arteries of natural gas supply, from a technical viewpoint. This yields a technical bounding on the supply available in different parts of the country. Additionally the economic structure of the Danish natural gas market is formulated mathematically giving a description of the transmission, distribution and storage options available to the market. The supply and demand of natural gas is put into a partial equilibrium context by integrating the developed model with the Balmorel model, which describes the markets for electricity and district heat. Specifically on the demand side the consumption of natural gas for heat and power generation is emphasized. General results and three demonstration cases are presented to illustrate how the developed model can be used to analyze various energy policy issues, and to disclose the strengths and weaknesses in the formulation. (au)

  9. Research into the transmission of natural gas by gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Gadonneix, P.

    1998-12-31

    This paper is the press release of the talk given at the `Gaz de France scientific meeting with the press` by P. Gadonneix, chairman of Gaz de France company, on October 7, 1998. The aim of this talk concerns the new French and European supply link for bringing natural gas from the Norwegian North Sea fields. This new supply link is the first direct link between Norway and France and the NorFra gas pipeline which brings natural gas from the North Sea to France is the longest offshore pipeline in the world. The `Artere des Hauts de France` pipeline (the largest diameter gas pipeline ever laid in France) is devoted to the transfer of natural gas from Dunkerque to the Gournay-sur-Aronde underground storage site. This paper describes successively: the French European gas supply hub, the NorFra project, the Artere des Hauts de France pipeline, the network performance research, the safety and quality guaranties, the reduction of overland natural gas transmission costs (improvement of pipe-laying techniques and optimization of line route and welding operations), the specific techniques used for road and river crossing (micro-tunnel digging, river-crossing ditches) and for anchoring (buoyancy compensation). Finally, the environmental impact of the laying operations is briefly described. (J.S.)

  10. 77 FR 14010 - Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC...

    Science.gov (United States)

    2012-03-08

    ..., EG12-18-000, EG12-19-000, EG12- 20-000, EG12-21-000, EG12-22-000, EG12-23-000] Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC, Minco Wind Interconnection Services, LLC, Shiloh III Lessee, LLC, California Ridge Wind Energy LLC, Perrin Ranch Wind, LLC, Erie Wind...

  11. Ownership unbundling of gas transmission networks. Empirical evidence

    Energy Technology Data Exchange (ETDEWEB)

    Growitsch, Christian [Koeln Univ. (Germany). Energiewirtschaftliches Inst.; Stronzik, Marcus [Scientific Institute for Infrastructure and Communication Services (WIK), Bad Honnef (Germany)

    2011-07-15

    The European Commission has intensively discussed the mandatory separation of natural gas transmission from production and services. However, economic theory is ambiguous on the price effects of vertical separation. In this paper, we empirically analyse the effect of ownership unbundling of gas transmission networks as the strongest form of vertical separation on the level of end-user prices. Therefore, we apply different dynamic estimators as system GMM and the bias-corrected least-squares dummy variable or LSDVC estimator on an unbalanced panel out of 18 EU countries over 19 years, allowing us to avoid the endogeneity problem and to estimate the long-run effects of regulation. We introduce a set of regulatory indicators as market entry regulation, ownership structure, vertical separation and market structure and account for structural and economic country specifics. Among these different estimators, we consistently find that ownership unbundling has no impact on natural gas end-user prices, while the more modest legal unbundling reduces them significantly. Furthermore, third-party access, market structure and privatisation show significant influence with the latter leading to higher price levels.

  12. 76 FR 43682 - Shetek Wind Inc. Jeffers South, LLC Allco Renewable Energy Limited v. Midwest Independent...

    Science.gov (United States)

    2011-07-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-53-000] Shetek Wind Inc. Jeffers South, LLC Allco Renewable Energy Limited v. Midwest Independent Transmission System Operator, Inc...), Shetek Wind Inc., Jeffers South, LLC, and Allco Renewable Energy Limited (collectively Complainants...

  13. A new algorithm predicts pressure and temperature profiles of gas/gas-condensate transmission pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mokhatab, Saied [OIEC - Oil Industries' Engineering and Construction Group, Tehran (Iran, Islamic Republic of); Vatani, Ali [University of Tehran (Iran, Islamic Republic of)

    2003-07-01

    The main objective of the present study has been the development of a relatively simple analytical algorithm for predicting flow temperature and pressure profiles along the two-phase, gas/gas-condensate transmission pipelines. Results demonstrate the ability of the method to predict reasonably accurate pressure gradient and temperature gradient profiles under operating conditions. (author)

  14. Transmission line component testing for the ITER Ion Cyclotron Heating and Current Drive System

    Science.gov (United States)

    Goulding, Richard; Bell, G. L.; Deibele, C. E.; McCarthy, M. P.; Rasmussen, D. A.; Swain, D. W.; Barber, G. C.; Barbier, C. N.; Cambell, I. H.; Moon, R. L.; Pesavento, P. V.; Fredd, E.; Greenough, N.; Kung, C.

    2014-10-01

    High power RF testing is underway to evaluate transmission line components for the ITER Ion Cyclotron Heating and Current Drive System. The transmission line has a characteristic impedance Z0 = 50 Ω and a nominal outer diameter of 305 mm. It is specified to carry up to 6 MW at VSWR = 1.5 for 3600 s pulses, with transient voltages up to 40 kV. The transmission line is actively cooled, with turbulent gas flow (N2) used to transfer heat from the inner to outer conductor, which is water cooled. High voltage and high current testing of components has been performed using resonant lines generating steady state voltages of 35 kV and transient voltages up to 60 kV. A resonant ring, which has operated with circulating power of 6 MW for 1 hr pulses, is being used to test high power, low VSWR operation. Components tested to date include gas barriers, straight sections of various lengths, and 90 degree elbows. Designs tested include gas barriers fabricated from quartz and aluminum nitride, and transmission lines with quartz and alumina inner conductor supports. The latest results will be presented. This manuscript has been authored by UT-Battelle, LLC, under Contract No. DE-AC05-00OR22725 with the U.S. Department of Energy.

  15. 78 FR 29364 - Exelon Corporation, Exelon Wind 1, LLC, Exelon Wind 2, LLC, Exelon Wind 3, LLC, Exelon Wind 4...

    Science.gov (United States)

    2013-05-20

    ...-005, QF07-55-005, QF07-56-005, QF07-257-004] Exelon Corporation, Exelon Wind 1, LLC, Exelon Wind 2, LLC, Exelon Wind 3, LLC, Exelon Wind 4, LLC, Exelon Wind 5, LLC, Exelon Wind 6, LLC, Exelon Wind 7, LLC, Exelon Wind 8, LLC, Exelon Wind 9, LLC, Exelon Wind 10, LLC, Exelon Wind 11, LLC, High Plains...

  16. Determination of Interfacial Area in Gas-Liquid Two Phase by Light Transmission

    International Nuclear Information System (INIS)

    Ghiasi, H.; Safekordi, A. A.; Babazadeh Shareh, F.

    2012-01-01

    The purpose of the present paper is to develop light beam method to measurement of interfacial area in a rectangular gas-liquid bubble column. Total interfacial area can be determined in bubble column filled by transparent liquid by light transmission method. According to pervious researches, the fraction of parallel light is function of interfacial area and optical path length that these two parameters imply Transmission Number or N T . The drop diameters were measured in the range of 2.2 to 5 mm, and in this range, the specific area is found to depend only upon the light transmission. Three different systems with various liquid phases have been used in this work. It had been proved that light transmission method for dilute suspension or stationary gas phase has a good consequence. In this work, good agreement between actual and calculated interfacial area proves that light transmission method would be able to determine interfacial area in multiple scattering, and it is possible to use earlier mathematic model to measure interfacial area in multiple scattering in gas-liquid bubble columns.

  17. 77 FR 22387 - Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering...

    Science.gov (United States)

    2012-04-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0024] Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering Pipeline Systems Annual Report, Gas Transmission and Gathering Pipeline Systems Incident Report...

  18. 77 FR 58616 - Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering...

    Science.gov (United States)

    2012-09-21

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0024] Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering Pipeline Systems Annual Report, Gas Transmission and Gathering Pipeline Systems Incident Report...

  19. 76 FR 50724 - Sawgrass Storage, L.L.C.; Notice of Application

    Science.gov (United States)

    2011-08-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP11-523-000; PF10-20-000] Sawgrass Storage, L.L.C.; Notice of Application Take notice that on July 27, 2011, Sawgrass Storage, L.L.C..., filed an application in Docket No. CP11-523-000 pursuant to Section 7(c) of the Natural Gas Act (NGA...

  20. Cross-border trading and transmission networks. The natural gas experience

    International Nuclear Information System (INIS)

    Zavattoni, G.

    1992-01-01

    The volume and sources of gas imports to Europe and cross-border trading regulations for gas imports into and within Europe are outlined. The import of gas from Algeria to Italy is presented as a case study. It deals with the purchase contract, transmission through Tunisia, the crossing of the Strait of Sicily and transportation within Italy. The EC Transit Directive, the Draft Directive(s) on third party access and the impact of the directives on the gas market are then discussed. (UK)

  1. 75 FR 47301 - Cedro Hill Wind LLC; Butler Ridge Wind Energy Center, LLC; High Majestic Wind Energy Center, LLC...

    Science.gov (United States)

    2010-08-05

    ...- 000; EG10-34-000; EG10-34-000; EG10-35-000; EG10-36-000; EG10-37-000; EG10-38-000] Cedro Hill Wind LLC; Butler Ridge Wind Energy Center, LLC; High Majestic Wind Energy Center, LLC; Wessington Wind Energy Center, LLC; Juniper Canyon Wind Power LLC; Loraine Windpark Project, LLC; White Oak Energy LLC; Meadow...

  2. 75 FR 68607 - CenterPoint Energy-Illinois Gas Transmission Company; Notice of Baseline Filing

    Science.gov (United States)

    2010-11-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-80-001] CenterPoint Energy--Illinois Gas Transmission Company; Notice of Baseline Filing November 1, 2010. Take notice that on October 28, 2010, CenterPoint Energy--Illinois Gas Transmission Company submitted a revised...

  3. 76 FR 5840 - Supermedia LLC, Formerly Known as Idearc Media LLC, Supermedia Information Services LLC, Client...

    Science.gov (United States)

    2011-02-02

    ... Known as Idearc Media LLC, Supermedia Information Services LLC, Client Care Group and Publishing... known as Idearc Media LLC, Client Care Group and Publishing Operations Group, Middleton, Massachusetts... Information Services LLC, Client Care Group and Publishing Operations Group, including on-site leased workers...

  4. 77 FR 70423 - Black Bear Hydro Partners, LLC and Black Bear Development Holdings, LLC and Black Bear SO, LLC...

    Science.gov (United States)

    2012-11-26

    ... Bear Hydro Partners, LLC and Black Bear Development Holdings, LLC and Black Bear SO, LLC; Notice of..., 2012, Black Bear Hydro Partners, LLC, sole licensee (transferor) and Black Bear Development Holdings, LLC and Black Bear SO, LLC (transferees) filed an application for the partial the transfer of licenses...

  5. Modelling the role of transmission companies in the downstream European gas market

    International Nuclear Information System (INIS)

    Boots, M.A.; Rijkers, F.A.M.

    2000-07-01

    This paper describes the empirical model GASTALE and shows several analyses of the European gas market using this model. These analyses are mainly focused on the role of the downstream transmission companies. Producers of natural gas are assumed to form an oligopoly throughout the paper. Considering an oligopolistic transmission structure our model results show that the level of transmitters' profits strongly depends on the possibilities of discrimination on the border prices. If price discrimination by producers is allowed, these producers collect the main part of the margins on end-use prices. Without price discrimination the transmission companies collect most of the margins. Assuming an oligopolistic downstream structure, end-use prices converge to prices corresponding to perfect competition when the number of transmitters increases. Given the oligopolistic structure of the upstream industry, it is of importance to prevent (or abolish) monopolistic structures in the downstream gas market. In the case where oligopolistic competition between downstream gas companies cannot be prevented, vertical integration should be supported (or at least not be discouraged). 14 refs

  6. 76 FR 20651 - Application To Export Electric Energy; Cargill Power Markets, LLC

    Science.gov (United States)

    2011-04-13

    ... application. SUMMARY: Cargill Power Markets, LLC (CPM) has applied for authority to transmit electric energy... the FPA (16 U.S.C. 824a(e)). On March 22, 2011, DOE received an application from CPM for authority to... international transmission facilities. CPM does not own any electric transmission facilities nor does it hold a...

  7. Statistical analyses of incidents on onshore gas transmission pipelines based on PHMSA database

    International Nuclear Information System (INIS)

    Lam, Chio; Zhou, Wenxing

    2016-01-01

    This article reports statistical analyses of the mileage and pipe-related incidents data corresponding to the onshore gas transmission pipelines in the US between 2002 and 2013 collected by the Pipeline Hazardous Material Safety Administration of the US Department of Transportation. The analysis indicates that there are approximately 480,000 km of gas transmission pipelines in the US, approximately 60% of them more than 45 years old as of 2013. Eighty percent of the pipelines are Class 1 pipelines, and about 20% of the pipelines are Classes 2 and 3 pipelines. It is found that the third-party excavation, external corrosion, material failure and internal corrosion are the four leading failure causes, responsible for more than 75% of the total incidents. The 12-year average rate of rupture equals 3.1 × 10"−"5 per km-year due to all failure causes combined. External corrosion is the leading cause for ruptures: the 12-year average rupture rate due to external corrosion equals 1.0 × 10"−"5 per km-year and is twice the rupture rate due to the third-party excavation or material failure. The study provides insights into the current state of gas transmission pipelines in the US and baseline failure statistics for the quantitative risk assessments of such pipelines. - Highlights: • Analyze PHMSA pipeline mileage and incident data between 2002 and 2013. • Focus on gas transmission pipelines. • Leading causes for pipeline failures are identified. • Provide baseline failure statistics for risk assessments of gas transmission pipelines.

  8. 75 FR 7305 - Drake Switching Company, LLC-Operation Exemption- Drake Cement, LLC

    Science.gov (United States)

    2010-02-18

    ... Switching Company, LLC--Operation Exemption-- Drake Cement, LLC Drake Switching Company, LLC (DSC), a... and operated by Drake Cement, LLC.\\1\\ \\1\\ Drake Cement, LLC filed a verified notice of exemption to acquire these track in STB Finance Docket No. 35350, Drake Cement, LLC--Acquisition Exemption--Clarkdale...

  9. 77 FR 24483 - Kern River Gas Transmission Company; Notice of Filing

    Science.gov (United States)

    2012-04-24

    ... funds used during construction (AFUDC) capitalized as a component of the construction costs of its Apex Expansion project (Apex), by recording AFUDC on the Apex project as though it was compounded monthly during... Transmission Company; Notice of Filing Take notice that on March 29, 2012, Kern River Gas Transmission Company...

  10. 75 FR 1052 - Terra-Gen Dixie Valley, LLC; TGP Dixie Development Company, LLC; New York Canyon, LLC; Notice of...

    Science.gov (United States)

    2010-01-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-29-000] Terra-Gen Dixie Valley, LLC; TGP Dixie Development Company, LLC; New York Canyon, LLC; Notice of Filing December 30, 2009. Take notice that on December 24, 2009, Terra-Gen Dixie Valley, LLC, TGP Dixie Development Company, LLC...

  11. Condensation in gas transmission pipelines. Phase behavior of mixtures of hydrogen with natural gas

    Energy Technology Data Exchange (ETDEWEB)

    Schouten, J.A.; Michels, J.P.J. [Amsterdam Univ. (Netherlands). Van der Waals-Zeeman Inst.; Rosmalen, R.J. van [Energy, Roden (Netherlands)

    2005-05-01

    Several pressure and temperature reductions occur along gas transmission lines. Since the pressure and temperature conditions of the natural gas in the pipeline are often close to the dew point curve, liquid dropout can occur. Injection of hydrogen into the natural gas will change the phase envelope and thus the liquid dropout. This condensation of the heavy hydrocarbons requires continuous operational attention and a positive effect of hydrogen may affect the decision to introduce hydrogen. In this paper we report on calculations of the amount of condensate in a natural gas and in this natural gas mixed with 16.7% hydrogen. These calculations have been performed at conditions prevailing in gas transport lines. The results will be used to discuss the difference in liquid dropout in a natural gas and in a mixture with hydrogen at pressure reduction stations, at crossings under waterways, at side-branching, and at separators in the pipelines. (author)

  12. Risk Analysis using Corrosion Rate Parameter on Gas Transmission Pipeline

    Science.gov (United States)

    Sasikirono, B.; Kim, S. J.; Haryadi, G. D.; Huda, A.

    2017-05-01

    In the oil and gas industry, the pipeline is a major component in the transmission and distribution process of oil and gas. Oil and gas distribution process sometimes performed past the pipeline across the various types of environmental conditions. Therefore, in the transmission and distribution process of oil and gas, a pipeline should operate safely so that it does not harm the surrounding environment. Corrosion is still a major cause of failure in some components of the equipment in a production facility. In pipeline systems, corrosion can cause failures in the wall and damage to the pipeline. Therefore it takes care and periodic inspections or checks on the pipeline system. Every production facility in an industry has a level of risk for damage which is a result of the opportunities and consequences of damage caused. The purpose of this research is to analyze the level of risk of 20-inch Natural Gas Transmission Pipeline using Risk-based inspection semi-quantitative based on API 581 associated with the likelihood of failure and the consequences of the failure of a component of the equipment. Then the result is used to determine the next inspection plans. Nine pipeline components were observed, such as a straight pipes inlet, connection tee, and straight pipes outlet. The risk assessment level of the nine pipeline’s components is presented in a risk matrix. The risk level of components is examined at medium risk levels. The failure mechanism that is used in this research is the mechanism of thinning. Based on the results of corrosion rate calculation, remaining pipeline components age can be obtained, so the remaining lifetime of pipeline components are known. The calculation of remaining lifetime obtained and the results vary for each component. Next step is planning the inspection of pipeline components by NDT external methods.

  13. 75 FR 76453 - Top of the World Wind Energy, LLC; Kit Carson Windpower, LLC; Chestnut Flats Wind, LLC; Minco...

    Science.gov (United States)

    2010-12-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG10-65-000; EG10-66-000; EG10-67-000; EG10-68-000; EG10- 69-000; EG10-70-000; EG10-71-000] Top of the World Wind Energy, LLC; Kit Carson Windpower, LLC; Chestnut Flats Wind, LLC; Minco Wind, LLC; Arizona Solar One LLC; Criterion...

  14. 75 FR 62530 - Eagle Creek Hydro Power, LLC; Laredo Ridge Wind, LLC; RRI Energy West, Inc.; Goshen Phase II LLC...

    Science.gov (United States)

    2010-10-12

    ... Ridge Wind, LLC; RRI Energy West, Inc.; Goshen Phase II LLC; Solar Partners I, LLC; Solar Partners II, LLC; Solar Partners VIII, LLC; Notice of Effectiveness of Exempt Wholesale Generator Status October 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EG10-48-000; EG10-51-000...

  15. 78 FR 9907 - TGP Development Company, LLC; TGP Flying Cloud Holdings, LLC; WEC TX Company, LLC v. Arizona...

    Science.gov (United States)

    2013-02-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-45-000] TGP Development Company, LLC; TGP Flying Cloud Holdings, LLC; WEC TX Company, LLC v. Arizona Public Service Company... section 206 of the Federal Power Act, 16 U.S.C. 824(e) (2006), TGP Development Company, LLC, TGP Flying...

  16. 75 FR 51169 - Notice of Sunshine Act Meeting

    Science.gov (United States)

    2010-08-18

    ... Report. A. Approval of TVA Board Committee Charters. B. Vision and Strategic Direction. 4. Report of the... relating to Bellefonte Nuclear Plant Unit 1, (ii) contract with Texas Gas Transmission, LLC, for gas... Marina--Commercial Recreation Easement with Fort Loudon Marina, LLC. FOR MORE INFORMATION: Please call...

  17. Model documentation: Natural gas transmission and distribution model of the National Energy Modeling System. Volume 1

    International Nuclear Information System (INIS)

    1995-01-01

    The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. NEMS was developed in the Office of integrated Analysis and Forecasting of the Energy information Administration (EIA). NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the EIA and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. The NGTDM is the model within the NEMS that represents the transmission, distribution, and pricing of natural gas. The model also includes representations of the end-use demand for natural gas, the production of domestic natural gas, and the availability of natural gas traded on the international market based on information received from other NEMS models. The NGTDM determines the flow of natural gas in an aggregate, domestic pipeline network, connecting domestic and foreign supply regions with 12 demand regions. The methodology employed allows the analysis of impacts of regional capacity constraints in the interstate natural gas pipeline network and the identification of pipeline capacity expansion requirements. There is an explicit representation of core and noncore markets for natural gas transmission and distribution services, and the key components of pipeline tariffs are represented in a pricing algorithm. Natural gas pricing and flow patterns are derived by obtaining a market equilibrium across the three main elements of the natural gas market: the supply element, the demand element, and the transmission and distribution network that links them. The NGTDM consists of four modules: the Annual Flow Module, the Capacity F-expansion Module, the Pipeline Tariff Module, and the Distributor Tariff Module. A model abstract is provided in Appendix A

  18. Model documentation: Natural gas transmission and distribution model of the National Energy Modeling System. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-17

    The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. NEMS was developed in the Office of integrated Analysis and Forecasting of the Energy information Administration (EIA). NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the EIA and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. The NGTDM is the model within the NEMS that represents the transmission, distribution, and pricing of natural gas. The model also includes representations of the end-use demand for natural gas, the production of domestic natural gas, and the availability of natural gas traded on the international market based on information received from other NEMS models. The NGTDM determines the flow of natural gas in an aggregate, domestic pipeline network, connecting domestic and foreign supply regions with 12 demand regions. The methodology employed allows the analysis of impacts of regional capacity constraints in the interstate natural gas pipeline network and the identification of pipeline capacity expansion requirements. There is an explicit representation of core and noncore markets for natural gas transmission and distribution services, and the key components of pipeline tariffs are represented in a pricing algorithm. Natural gas pricing and flow patterns are derived by obtaining a market equilibrium across the three main elements of the natural gas market: the supply element, the demand element, and the transmission and distribution network that links them. The NGTDM consists of four modules: the Annual Flow Module, the Capacity F-expansion Module, the Pipeline Tariff Module, and the Distributor Tariff Module. A model abstract is provided in Appendix A.

  19. 75 FR 65515 - Supermedia LLC, Formerally Known as IDEARC Media LLC, Supermedia Information Services LLC, Client...

    Science.gov (United States)

    2010-10-25

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,290] Supermedia LLC, Formerally Known as IDEARC Media LLC, Supermedia Information Services LLC, Client Care Group and Publishing Operations Group, Including On-Site Leased Workers of Advavtage (TAC), RESPRCCONN, TATACONSSV, MODIS, AMDOCS...

  20. 76 FR 40946 - WNC Tax Credits 40, LLC, WNC Tax Credits 41, LLC, WNC Housing Tax Credits Manager 2, LLC, WNC...

    Science.gov (United States)

    2011-07-12

    ... Credits 40, LLC, WNC Tax Credits 41, LLC, WNC Housing Tax Credits Manager 2, LLC, WNC National Partners... (``Fund 41'') (each a ``Fund,'' and collectively, the ``Funds''), WNC Housing Tax Credits Manager 2, LLC (the ``Manager''), WNC National Partners, LLC (``WNC National Partners'') and WNC & Associates, Inc...

  1. The development of a gas transmission system in Lebanon

    Energy Technology Data Exchange (ETDEWEB)

    Proudian, Serko; Rickaert, Stefan [Tractebel Engineering, Brussels (Belgium)

    2005-07-01

    Tractebel Engineering is undertaking for the Lebanese Ministry of Energy and Water (MEW) advisory services for the launching and for the awarding of a DBOT (Design, Build, Operate and Transfer) contract for the development of a gas transmission system through Lebanon. The service embraces a global approach, integrating legal, market, technical and financial matters, to provide MEW with a clear strategy to its gas development program, aimed at attracting private investors willing to tender on this DBOT project.The Legal Framework Report examines the existing Lebanese legal system and analyzes its suitability to the regulatory framework required to operate gas networks; it also provides recommendations aimed at attracting potential DBOT developers, by facilitating bureaucratic procedures with possible enactment of new laws. The Gas Demand Due Diligence Report provides the market study for present and future demand of gas in Lebanon in the next 25 years (duration of the DBOT contract), with anticipated needs resulting from power generation, industrial sector, commercial and residential sectors. The Pipeline Alternative Solutions Report provides several alternative routing and configurations for the gas transmission pipeline, including surveys, in-land routing (through rough mountain and heavily populated areas), or off-shore routing (through rough marine canyons and sea water depth in excess of 1,500 meters). Basic technical economical study is elaborated for more than 30 options.The Pipeline Financial Optimization Report compares the economics and provides for each solution the expected postal tariff (the compensation that MEW would need to pay to the developer for the execution of the 25 year DBOT contract). The advisory services are completed with preparation of the Pre-Qualification Notice (aimed at selecting a short list of qualified Bidders), preparation of the Request For Proposal (bidding on the selected pipeline option), evaluation of proposal, selection of

  2. 75 FR 7303 - Drake Cement, LLC-Acquisition Exemption-Clarkdale Arizona Central Railroad, LLC

    Science.gov (United States)

    2010-02-18

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Finance Docket No. 35350] Drake Cement, LLC--Acquisition Exemption--Clarkdale Arizona Central Railroad, LLC Drake Cement, LLC (DC), a..., Drake Switching Company, LLC --Operation Exemption-- Drake Cement, LLC. DC certifies that the projected...

  3. Transport Insight 2009. An annual behind-the-scenes view in North West European gas transmission

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-09-15

    Transport Insight provides the users of the gas network, customers (shippers) and other stakeholders with clear and coherent information every year, directly from the source; the Transmission System Operators. TSOs Gas Transport Services (GTS) and Gasunie Deutschland (GUD) have worked closely together to present Transport Insight 2009 as a joint publication. Section 1 describes the major developments and circumstances that affected the gas transmission system in 2008. Section 2 gives in-depth analyses of actual gas transmission at the border clusters of the Gas Transport Services and Gasunie Deutschland grids. These are illustrated in graphs by means of key figures from 2008 and show details of availability, contracted capacity and usage. Section 3 considers trends in Europe, specifically looking at the production decline and swing decline. These sections are followed by the themes in section 4. In these themes a specific topic is discussed in more detail. The first theme describes developments concerning the Title Transfer Facility (TTF) and the Virtual Trading Place (VHP). The second theme focuses on trends in gas storage in Europe.

  4. Transport Insight 2009. An annual behind-the-scenes view in North West European gas transmission

    International Nuclear Information System (INIS)

    2009-09-01

    Transport Insight provides the users of the gas network, customers (shippers) and other stakeholders with clear and coherent information every year, directly from the source; the Transmission System Operators. TSOs Gas Transport Services (GTS) and Gasunie Deutschland (GUD) have worked closely together to present Transport Insight 2009 as a joint publication. Section 1 describes the major developments and circumstances that affected the gas transmission system in 2008. Section 2 gives in-depth analyses of actual gas transmission at the border clusters of the Gas Transport Services and Gasunie Deutschland grids. These are illustrated in graphs by means of key figures from 2008 and show details of availability, contracted capacity and usage. Section 3 considers trends in Europe, specifically looking at the production decline and swing decline. These sections are followed by the themes in section 4. In these themes a specific topic is discussed in more detail. The first theme describes developments concerning the Title Transfer Facility (TTF) and the Virtual Trading Place (VHP). The second theme focuses on trends in gas storage in Europe.

  5. A precipitation-induced landslide susceptibility model for natural gas transmission pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Finley, Jason P. [Fugro William Lettis and Associates, Inc., Valencia, California (United States); Slayter, David L.; Hitchcock, Chris S. [Fugro William Lettis and Associates, Inc., Walnut Creek, California (United States); Lee, Chih-Hung [Pacific Gas and Electric Company, Gas Systems Integrity Management, Walnut Creek, California (United States)

    2010-07-01

    Landslides related to heavy rainfall can cause extensive damage to natural gas transmission pipelines. Fugro William Lettis and Associates Inc. have developed and implemented a geographic information system (GIS) model that evaluates near real-time precipitation-induced landslide susceptibility. The model incorporates state-wide precipitation data and geologically-based landslide classifications to produce rapid landslide risk evaluation for Pacific Gas and Electric Company's (PGandE) gas transmission system during winter rain storms in California. The precipitation data include pre-storm event quantitative precipitation forecasts (QPF) and post-storm event quantitative precipitation estimate (QPE) from the United States National Oceanic and Atmospheric Administration (NOAA). The geologic classifications are based on slope, susceptible geologic formations, and the locations of historic or known landslide occurrences. Currently the model is calibrated using qualitative measures. This paper describes the development of the model algorithm and input data, model results, calibration efforts, and the on-going research and landslide collection warranted for continued refinement of the model.

  6. Natural Gas Transmission and Distribution Model of the National Energy Modeling System. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. The NGTDM is the model within the NEMS that represents the transmission, distribution, and pricing of natural gas. The model also includes representations of the end-use demand for natural gas, the production of domestic natural gas, and the availability of natural gas traded on the international market based on information received from other NEMS models. The NGTDM determines the flow of natural gas in an aggregate, domestic pipeline network, connecting domestic and foreign supply regions with 12 demand regions. The purpose of this report is to provide a reference document for model analysts, users, and the public that defines the objectives of the model, describes its basic design, provides detail on the methodology employed, and describes the model inputs, outputs, and key assumptions. Subsequent chapters of this report provide: an overview of NGTDM; a description of the interface between the NEMS and NGTDM; an overview of the solution methodology of the NGTDM; the solution methodology for the Annual Flow Module; the solution methodology for the Distributor Tariff Module; the solution methodology for the Capacity Expansion Module; the solution methodology for the Pipeline Tariff Module; and a description of model assumptions, inputs, and outputs.

  7. 76 FR 53086 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-08-25

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT...

  8. 76 FR 34103 - In the Matter of Areva Enrichment Services, LLC (Eagle Rock Enrichment Facility); Notice of...

    Science.gov (United States)

    2011-06-10

    .... 10-899-02-ML-BD01] In the Matter of Areva Enrichment Services, LLC (Eagle Rock Enrichment Facility...'' portion of this proceeding regarding the December 2008 application by AREVA Enrichment Services, LLC (AES... gas centrifuge uranium enrichment facility--denoted as the Eagle Rock Enrichment Facility (EREF)--in...

  9. 76 FR 70953 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-11-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket ID PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Advance notice of...

  10. 78 FR 59663 - Combined Notice of Filings

    Science.gov (United States)

    2013-09-27

    ... Paso Marketing Company, L.L.C., Gazprom Marketing & Trading USA, Inc. Description: Joint Petition for... Provisions of El Paso Marketing Company, L.L.C. and Gazprom Marketing & Trading USA, Inc. Filed Date: 9/17/13...: Discovery Gas Transmission LLC. Description: 2013 Tariff Revisions--Kinetica Interconnect to be effective 10...

  11. Comparative study of aerial transmission lines and underground isolated on gas

    International Nuclear Information System (INIS)

    Quesada Jimenez, Marco Esteban

    2012-01-01

    A comparison was made of aerial power lines and underground isolated on gas. Growing electric demand has given way to debate the lines transmission. Multiple discussions have generated about its application, however, the energy must be supplied and this process leads to the search for more efficient methods. The theory has covered the most important design criteria of the airlines and an introduction to the little known transport lines isolated on gas. The process of manufacturing, installation and operation are studied within the scope of the project. Count information is included in the main aspects of calculation relating to power transmission. Besides, the planning of the optimal route nominal calculations, load flow and power losses are focused as well as magnetic field strengths and finally economic analysis. (author) [es

  12. 75 FR 17976 - WNC Tax Credits 38, LLC, WNC Tax Credits 39, LLC, WNC Housing Tax Credits Manager, LLC and WNC...

    Science.gov (United States)

    2010-04-08

    ... Credits 38, LLC, WNC Tax Credits 39, LLC, WNC Housing Tax Credits Manager, LLC and WNC & Associates, Inc... collectively, the ``Funds''), WNC Housing Tax Credits Manager, LLC (the ``Manager'') and WNC & Associates, Inc... credit under the Internal Revenue Code of 1986, as amended. The Manager is a California limited liability...

  13. 77 FR 40608 - Notice of Petition for Enforcement and Declaratory Order; Exelon Wind 1, LLC; Exelon Wind 2, LLC...

    Science.gov (United States)

    2012-07-10

    ... Petition for Enforcement and Declaratory Order; Exelon Wind 1, LLC; Exelon Wind 2, LLC; Exelon Wind 3, LLC; Exelon Wind 4, LLC; Exelon Wind 5, LLC; Exelon Wind 6, LLC; Exelon Wind 7, LLC; Exelon Wind 8, LLC; Exelon Wind 9, LLC; Exelon Wind 10, LLC; Exelon Wind 11, LLC; High Plains Wind Power, LLC Take notice...

  14. 78 FR 44900 - Communication of Operational Information Between Natural Gas Pipelines and Electric Transmission...

    Science.gov (United States)

    2013-07-25

    ... Regional Transmission Organizations and Independent System Operators (RTOs/ISOs) also noted that, although... operator from discussions between RTOs/ ISOs and natural gas pipelines regarding the status of a generator... not customers of electric transmission operators. Likewise, in the case of RTOs/ISOs, they are not...

  15. Gas transmission : a paradigm shift

    International Nuclear Information System (INIS)

    Cornelson, D.W.

    1997-01-01

    The evolution of energy markets in North America was discussed. The investment opportunities that are possible in a deregulated energy market, be it in production or in the generation of energy commodities, in the development of midstream infrastructure, or in the provision of energy services, were outlined. Deregulation of crude oil, natural gas and electricity has resulted in significant changes in the structure of energy markets and the way in which customers are served. One of the advantages of competition regarding power generation is that it has turned energy into a commodity which has resulted in greater customer choice and efficiency. As one example of midstream infrastructure development, the Alliance Pipeline project was described. This project was conceived as a means to enhance the value of western Canadian natural gas. The 1,900 mile pipeline will run from British Columbia, through Alberta into Chicago where it will interconnect with the North American gas transmission grid. The pipeline is an efficient means of transporting energy from Western Canada to North American markets, and Alliance, as a lowest cost transporter, will continue to put pressure on the traditional infrastructure to become even more competitive at the margin. As such, Alliance represents a paradigm shift in energy transportation, and serves as an excellent example of the type of investment opportunity that a deregulated market can provide. It was suggested that innovation and competition in a deregulated North American energy market will continue to increase. As electricity is deregulated, the energy market will respond more quickly to changes in supply and demand than it did in the past, in an effort to satisfy the needs of investors and customers. This will provide increased opportunities for restructuring and further competition

  16. 77 FR 12274 - Orders Granting Authority To Import and Export Natural Gas and Liquefied Natural Gas During...

    Science.gov (United States)

    2012-02-29

    ... Authority To Import and Export Natural Gas and Liquefied Natural Gas During January 2012 AGENCY: Office of... LNG, LP 11-98-LNG ENERGY PLUS NATURAL GAS LLC 11-155-NG BROOKFIELD ENERGY MARKETING L.P 12-03-NG WPX... granting authority to import and export natural gas and liquefied natural gas. These Orders are summarized...

  17. Price and volatility transmissions between natural gas, fertilizer, and corn markets

    NARCIS (Netherlands)

    Etienne, Xiaoli Liao; Trujillo-Barrera, Andrés; Wiggins, Seth

    2016-01-01

    Purpose – The purpose of this paper is to investigate the price and volatility transmission between natural gas, fertilizer (ammonia), and corn markets, an issue that has been traditionally ignored in the literature despite its significant importance. Design/methodology/approach – The authors

  18. 77 FR 31838 - Notice of Orders Granting Authority to Import and Export Natural Gas and Liquefied Natural Gas...

    Science.gov (United States)

    2012-05-30

    ... Granting Authority to Import and Export Natural Gas and Liquefied Natural Gas During April 2012 AGENCY... International, LLC....... 12-33-NG Phillips 66 Company 12-34-NG Northwest Natural Gas Company 12-41-NG Sequent... authority to import and export natural gas and liquefied natural gas. These Orders are summarized in the...

  19. 78 FR 21349 - Orders Granting Authority To Import and Export Natural Gas, To Export Liquefied Natural Gas, To...

    Science.gov (United States)

    2013-04-10

    ... DEPARTMENT OF ENERGY Orders Granting Authority To Import and Export Natural Gas, To Export Liquefied Natural Gas, To Export Compressed Natural Gas, Vacating Prior Authority and Denying Request for... OIL COMMERCIAL GP 12-164-NG XPRESS NATURAL GAS LLC 12-168-CNG MERRILL LYNCH COMMODITIES CANADA, ULC 12...

  20. 77 FR 38884 - Professional Transportation, Inc.-Asset Acquisition-CUSA ES, LLC and CUSA CSS, LLC

    Science.gov (United States)

    2012-06-29

    ..., Inc.--CUSA ES, LLC (MC-463168) and CUSA CSS, LLC (MC-522544) (collectively, Coach America Subsidiaries... Transportation, Inc.--Asset Acquisition--CUSA ES, LLC and CUSA CSS, LLC AGENCY: Surface Transportation Board. ACTION: Notice of Finance Application. SUMMARY: Professional Transportation, Inc. (PTI or Applicant), an...

  1. 78 FR 15053 - Simpson Lumber Company, LLC, Shelton, Washington; Simpson Lumber Company, LLC, Tacoma, Washington...

    Science.gov (United States)

    2013-03-08

    ...,372B] Simpson Lumber Company, LLC, Shelton, Washington; Simpson Lumber Company, LLC, Tacoma, Washington; Simpson Lumber Company, LLC, Longview, Washington; Notice of Revised Determination on Reconsideration On... Reconsideration for the workers and former workers of Simpson Lumber Company, LLC, Shelton, Washington (TA-W-81...

  2. 78 FR 21151 - Boise White Paper, LLC, A Subsidiary of Boise Paper Holdings, LLC, Including On-Site Leased...

    Science.gov (United States)

    2013-04-09

    ... Paper, LLC, A Subsidiary of Boise Paper Holdings, LLC, Including On-Site Leased Workers From Guardsmark.... Helens, OR; Boise White Paper, LLC, A Subsidiary of Boise Paper Holdings, LLC, Vancouver, WA; Amended... workers and former workers of Boise White Paper, LLC, a subsidiary of Boise Paper Holdings, LLC, St...

  3. 75 FR 7577 - Combined Notice of Filings # 1

    Science.gov (United States)

    2010-02-22

    ..., LLC, Baltimore Gas and Electric Company, Constellation Pwr Source Generation LLC, Constellation New... Operating Companies FERC Electric Third Revised Volume No. 1 Open Access Transmission Tariff. Filed Date: 02... Numbers: EG10-20-000. Applicants: Northeastern Power Company. Description: Notice of Self-Certification of...

  4. 75 FR 82426 - Big Four Terminal Railroad, LLC-Operation Exemption-RMW Ventures, LLC

    Science.gov (United States)

    2010-12-30

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35454] Big Four Terminal Railroad, LLC--Operation Exemption--RMW Ventures, LLC Big Four Terminal Railroad, LLC (BFTR), has filed a verified notice of exemption under 49 CFR 1150.31 to operate over 5.2 +/- miles of rail line between...

  5. 75 FR 76520 - Tennessee Southern Railroad Company, Patriot Rail, LLC, Patriot Rail Holdings LLC, and Patriot...

    Science.gov (United States)

    2010-12-08

    ... family by converting two of its subsidiaries from corporations into limited liability companies: (1... Railroad Company, Patriot Rail, LLC, Patriot Rail Holdings LLC, and Patriot Rail Corp.--Corporate Family... Railroad Company (TSRR), Patriot Rail, LLC (PRL) and its subsidiaries, Patriot Rail Holdings LLC (PRH) and...

  6. 75 FR 34477 - Potomac-Appalachian Transmission Highline (PATH) Environmental Impact Statement, Harpers Ferry...

    Science.gov (United States)

    2010-06-17

    ... underbuild on the PATH transmission structures; and also the grant of a new 200-feet-wide right-of-way for..., LLC (PJM), the regional transmission organization. PJM oversees the overall movement of wholesale... mitigation strategies that respond to the purpose, need, and objectives of this proposal. The goal of the...

  7. 75 FR 77862 - FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2010-12-14

    ... Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit Applications Accepted.... On August 6, 2010, FFP Missouri 16, LLC (FFP) and Solia 9 Hydroelectric, LLC filed preliminary permit...-2822. Solia 9 Hydroelectric's proposed Lock and Dam 15 Hydropower Project (Project No. 13827-000) would...

  8. Natural gas transmission and distribution model of the National Energy Modeling System

    International Nuclear Information System (INIS)

    1997-02-01

    The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. NEMS was developed in the Office of Integrated Analysis and Forecasting of the Energy Information Administration (EIA). NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the EIA and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. From 1982 through 1993, the Intermediate Future Forecasting System (IFFS) was used by the EIA for its analyses, and the Gas Analysis Modeling System (GAMS) was used within IFFS to represent natural gas markets. Prior to 1982, the Midterm Energy Forecasting System (MEFS), also referred to as the Project Independence Evaluation System (PIES), was employed. NEMS was developed to enhance and update EIA's modeling capability by internally incorporating models of energy markets that had previously been analyzed off-line. In addition, greater structural detail in NEMS permits the analysis of a broader range of energy issues. The time horizon of NEMS is the midterm period (i.e., through 2015). In order to represent the regional differences in energy markets, the component models of NEMS function at regional levels appropriate for the markets represented, with subsequent aggregation/disaggregation to the Census Division level for reporting purposes

  9. Natural gas transmission and distribution model of the National Energy Modeling System

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. NEMS was developed in the Office of Integrated Analysis and Forecasting of the Energy Information Administration (EIA). NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the EIA and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. From 1982 through 1993, the Intermediate Future Forecasting System (IFFS) was used by the EIA for its analyses, and the Gas Analysis Modeling System (GAMS) was used within IFFS to represent natural gas markets. Prior to 1982, the Midterm Energy Forecasting System (MEFS), also referred to as the Project Independence Evaluation System (PIES), was employed. NEMS was developed to enhance and update EIA`s modeling capability by internally incorporating models of energy markets that had previously been analyzed off-line. In addition, greater structural detail in NEMS permits the analysis of a broader range of energy issues. The time horizon of NEMS is the midterm period (i.e., through 2015). In order to represent the regional differences in energy markets, the component models of NEMS function at regional levels appropriate for the markets represented, with subsequent aggregation/disaggregation to the Census Division level for reporting purposes.

  10. 78 FR 24803 - Hilco SP Rail, LLC-Acquisition and Operation Exemption-RG Steel Railroad Holding, LLC

    Science.gov (United States)

    2013-04-26

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35734] Hilco SP Rail, LLC--Acquisition and Operation Exemption--RG Steel Railroad Holding, LLC Hilco SP Rail, LLC (Hilco), a noncarrier... Holding, LLC, and operate as a common carrier over an approximately 12-mile line of railroad in Sparrows...

  11. 76 FR 7186 - TGP Development Company, LLC v. California Independent System Operator Corporation; Notice of...

    Science.gov (United States)

    2011-02-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-17-000] TGP Development.... Take notice that on January 28, 2011, TGP Development Company, LLC (TGP or Complainants), pursuant to...), concerning the requirement that TGP post its second financial security for transmission upgrades identified...

  12. Cooperation between West and East German gas transmission companies - an example of collaboration with Eastern European gas suppliers

    International Nuclear Information System (INIS)

    Geweke, J.

    1994-01-01

    In the future, it can be assumed there will be a new quality of co-operation between the East and the West. The tremendous growth in demand for natural gas in Europe necessitates the development of new, increasingly distant gas resources. The investment required can not be raised by a few countries on their own. A strategy is needed for all states integrated in the European natural gas transmission system. Due to their geographic location, Eastern and Southern European countries have a key role to play. Central Europe will become the heart of the international natural gas business. Then the future co-operation between East and Western Europe must be taken into account. An important prerequisite for equal partners in the European gas industry will be coordination, if natural gas is to continue to make a growing contribution to an environmentally compatible and efficient energy supply in all European states and beyond. (orig.)

  13. Atmospheric Transmission Measurements Using IR Lasers, Fourier Transform Spectroscopy, and Gas-Filter Correlation Techniques

    National Research Council Canada - National Science Library

    Dowling, J

    1977-01-01

    ... and a gas filter correlation spectrometer. Results obtained from three concurrent experiments used to generate a data base appropriate to high resolution transmission model validation are displayed...

  14. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2013-06-06

    .... 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary... Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit applications... regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund XXX, LLC's application is for a...

  15. 75 FR 49527 - Caps Visual Communications, LLC; Black Dot Group; Formerly Known as Caps Group Acquisition, LLC...

    Science.gov (United States)

    2010-08-13

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,195] Caps Visual Communications, LLC; Black Dot Group; Formerly Known as Caps Group Acquisition, LLC Chicago, IL; Amended... of Caps Visual Communications, LLC, Black Dot Group, formerly known as Caps Group Acquisition, LLC...

  16. 77 FR 30551 - Commercial Renewable Energy Transmission on the Outer Continental Shelf (OCS) Offshore Rhode...

    Science.gov (United States)

    2012-05-23

    ... transmission grid on the Rhode Island mainland to Block Island. Deepwater Wind proposes to connect an onshore... Island LLC (Deepwater Wind) Transmission System (BITS) proposal submitted to the Bureau of Ocean Energy... electrical power from Deepwater Wind's proposed 30 megawatt (MW) offshore wind energy project located in...

  17. Modeling of leak detection system for high pressure transmission system of natural gas

    International Nuclear Information System (INIS)

    Qureshi, S.A.; Paracha, Z.J.; Ali, A.

    2005-01-01

    Gas Industry can be considered as one of the most important industries in the economy of any country. Safe Transportation of Gas is thus considered to be vital because interruption of Supply of Gas to consumers not only causes domestic problems but also loss of revenue to country. Now most of power generation Sector has switched over their system to Natural Gas. So, interruption of supply to this sector can cause a lot of problems. This paper has provided assessment of technology approach and formulated this approach for Leak Detection Model in High Pressure Transmission system for current and future operations, which will improve the efficiency of any transmission company to a great extent. This model can be extremely helpful in conditions of Rupture Emergencies or Leakage because of corrosive conditions of Pipeline to manage the situation of resources in pipeline network. Any exceptional readings or messages should alert the user to the fact that something is wrong with the system. Such a system helps a lot in the safe and efficient management of pipeline network. The data and information provided by the Leak Detection System applications will allow for efficient and safe pipeline operation maximizing profitability over the pipeline's service lifetime. (author)

  18. 77 FR 49789 - Record of Decision for Issuing a Presidential Permit to Energia Sierra Juarez U.S. Transmission...

    Science.gov (United States)

    2012-08-17

    ... Energia Sierra Juarez U.S. Transmission, LLC, for the Energia Sierra Juarez U.S. Transmission Line Project...: Record of Decision (ROD). SUMMARY: DOE announces its decision to issue a Presidential permit to Energia... analyzed in the Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project...

  19. 75 FR 76003 - Tricor Ten Section Hub LLC; Notice of Availability of the Environmental Assessment for the...

    Science.gov (United States)

    2010-12-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09-432-000] Tricor Ten Section Hub LLC; Notice of Availability of the Environmental Assessment for the Proposed Ten Section Gas... Commission) has prepared an environmental assessment (EA) for the Ten Section Gas Storage Project, in Kern...

  20. CRE deliberation concerning balancing regime developments for the natural gas transmission network in France

    International Nuclear Information System (INIS)

    2006-06-01

    GRTgaz has presented a project of progressive changeover to a new market-based balancing system, according to the following principles: quantities of gas required to ensure transmission network balancing are purchased from or sold on the daily and intra-day market by transmission system operators (TSOs); a daily gas balancing price reflecting actual costs borne by every TSO is defined according to these purchases and sales; every day, each shipper residual position after use of the available flexibility and tolerance, is cleared off by transactions at the daily balancing gas price, under terms encouraging shippers to minimise their imbalance. In order to incorporate current development of the French market, which still has low liquidity, GRTgaz proposes to progressively develop the volume of its market transactions. Within this context, from 4 May to 6 June 2006, CRE organised a public consultation concerning balancing regime developments, a summary of which is presented. The last part concerns the CRE decisions. (A.L.B.)

  1. 77 FR 12280 - FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary...

    Science.gov (United States)

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13824-000, 13826-000] FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary Permit... Hydroelectric, LLC, Project No. 13826-000. 2. FFP Missouri 17, LLC, Project No. 13824-000. Dated: February 22...

  2. 75 FR 41895 - Inteva Products, LLC Adrian, Michigan; Inteva Products, LLC Troy, Michigan; Amended Certification...

    Science.gov (United States)

    2010-07-19

    ... Products, LLC Adrian, Michigan; Inteva Products, LLC Troy, Michigan; Amended Certification Regarding... time period at the Troy, Michigan location of Inteva Products, LLC. The Troy, Michigan location.... Accordingly, the Department is amending the certification to include workers of the Troy, Michigan location of...

  3. 76 FR 71007 - Shetek Wind Inc., Jeffers South, LLC and Allco Renewable Energy Limited, Midwest Independent...

    Science.gov (United States)

    2011-11-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-53-000] Shetek Wind Inc., Jeffers South, LLC and Allco Renewable Energy Limited, Midwest Independent Transmission System Operator... an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission...

  4. 76 FR 78641 - Cedar Creek Wind Energy, LLC, Milford Wind Corridor Phase I, LLC; Notice of Filing

    Science.gov (United States)

    2011-12-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RC11-1-002; Docket No. RC11-2-002] Cedar Creek Wind Energy, LLC, Milford Wind Corridor Phase I, LLC; Notice of Filing Take...) June 16, 2011 Order.\\1\\ \\1\\ Cedar Creek Wind Energy, LLC and Milford Wind Corridor Phase I, LLC, 135...

  5. 77 FR 60981 - TGP Granada, LLC and Roosevelt Wind Ranch, LLC v. Public Service Company of New Mexico, Tortoise...

    Science.gov (United States)

    2012-10-05

    ...; EL12-43-000, EL12-43-001 TGP Granada, LLC and Roosevelt Wind Ranch, LLC v. Public Service Company of New Mexico, Tortoise Capital Resources Corp.; TGP Granada, LLC and Roosevelt Wind Ranch, LLC; Notice... over capacity on the Eastern Interconnection Project. \\1\\ TGP Granada, LLC v. Pub. Serv. Co. of New...

  6. 75 FR 34170 - Plastic Omnium Automotive Exteriors, LLC, Anderson, SC; Plastic Omnium Automotive Exteriors, LLC...

    Science.gov (United States)

    2010-06-16

    ... Omnium Automotive Exteriors, LLC, Anderson, SC; Plastic Omnium Automotive Exteriors, LLC, Troy, MI... the Anderson, South Carolina location of Plastic Omnium Automotive Exteriors, LLC, working out of Troy... certification to include workers in support of the Anderson, South Carolina facility working out of Troy...

  7. 78 FR 16850 - Sunshine Act Meetings

    Science.gov (United States)

    2013-03-19

    ... Market Operations. A-3 AD12-12-000 Coordination Between Natural Gas and Electricity Markets. ELECTRIC E-1...-313-000 Essar Steel Minnesota, LLC v. Great Lakes Gas Transmission Limited Partnership. HYDRO H-1 P...

  8. Moment analysis of the time-dependent transmission of a step-function input of a radioactive gas through an adsorber bed

    International Nuclear Information System (INIS)

    Lee, T.V.; Rothstein, D.; Madey, R.

    1986-01-01

    The time-dependent concentration of a radioactive gas at the outlet of an adsorber bed for a step change in the input concentration is analyzed by the method of moments. This moment analysis yields analytical expressions for calculating the kinetic parameters of a gas adsorbed on a porous solid in terms of observables from a time-dependent transmission curve. Transmission is the ratio of the adsorbate outlet concentration to that at the inlet. The three nonequilibrium parameters are the longitudinal diffusion coefficient, the solid-phase diffusion coefficient, and the interfacial mass-transfer coefficient. Three quantities that can be extracted in principle from an experimental transmission curve are the equilibrium transmission, the average residence (or propagation) time, and the first-moment relative to the propagation time. The propagation time for a radioactive gas is given by the time integral of one minus the transmission (expressed as a fraction of the steady-state transmission). The steady-state transmission, the propagation time, and the first-order moment are functions of the three kinetic parameters and the equilibrium adsorption capacity. The equilibrium adsorption capacity is extracted from an experimental transmission curve for a stable gaseous isotope. The three kinetic parameters can be obtained by solving the three analytical expressions simultaneously. No empirical correlations are required

  9. 75 FR 12230 - Black Oak Energy, L.L.C., EPIC Merchant Energy, LP, SESCO Enterprises, LLC v. PJM Interconnection...

    Science.gov (United States)

    2010-03-15

    ... Energy, L.L.C., EPIC Merchant Energy, LP, SESCO Enterprises, LLC v. PJM Interconnection, L.L.C.; Notice of Filing March 8, 2010. Take notice that on March 1, 2010, PJM Interconnection, L.L.C. filed a..., Order Accepting Compliance filing issued in this proceeding, Black Oak Energy, L.L.C., et al. v. PJM...

  10. Carrington Real Estate Services, LLC and Carrington Mortgage Services, LLC Information Sheet

    Science.gov (United States)

    Carrington Real Estate Services, LLC and Carrington Mortgage Services, LLC (the Company) is located in Anaheim, California. The settlement involves the sale of properties constructed prior to 1978, located in Bakersfield and Ridgecrest, California.

  11. 78 FR 19530 - RG Steel Sparrows Point LLC, Formerly Known as Severstal Sparrows Point LLC, a Subsidiary of RG...

    Science.gov (United States)

    2013-04-01

    ... Leased Workers From Echelon Service Company, Sun Associated Industries, Inc., MPI Consultants LLC... Services LLC, and Recycling & Treatment Technologies of Baltimore, LLC Sparrows Point, Maryland; Amended... Service Company, Sun Associated Industries, Inc., MPI Consultants LLC, Alliance Engineering, Inc...

  12. 78 FR 40511 - RG Steel Sparrows Point LLC, Formerly Known as Severstal Sparrows Point LLC, a Subsidiary of RG...

    Science.gov (United States)

    2013-07-05

    ... Leased Workers From Echelon Service Company, Sun Associated Industries, Inc., MPI Consultants Llc... Services LLC, Recycling & Treatment Technologies of Baltimore, Llc, and Lafarge North America, Sparrows... leased workers from Echelon Service Company, Sun Associated Industries, Inc., MPI Consultants LLC...

  13. 75 FR 69469 - Supermedia, LLC, Formerly Known as Idearc Media, LLC, a Subsidiary of Supermedia Information...

    Science.gov (United States)

    2010-11-12

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-73,170] Supermedia, LLC, Formerly Known as Idearc Media, LLC, a Subsidiary of Supermedia Information Services, LLC, Troy, NY; Notice of Affirmative Determination Regarding Application for Reconsideration By application dated July 16, 2010, a...

  14. 77 FR 27763 - Quantum Choctaw Power, LLC, USG Nevada LLC, et al.; Notice of Effectiveness of Exempt Wholesale...

    Science.gov (United States)

    2012-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG12-31-000; EG12-32-000; et al.] Quantum Choctaw Power, LLC, USG Nevada LLC, et al.; Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Quantum Choctaw Power, LLC EG12-31-000 USG Nevada LLC EG12-32-000...

  15. 77 FR 65874 - Kinder Morgan Pony Express Pipeline LLC, Hiland Crude, LLC; Notice of Petition For Declaratory Order

    Science.gov (United States)

    2012-10-31

    ... Pony Express Pipeline LLC, Hiland Crude, LLC; Notice of Petition For Declaratory Order Take notice that..., 18 CFR 385.207(a)(2)(2012), Kinder Morgan Pony Express Pipeline LLC and Hiland Crude, LLC, filed a... terms, as described in filing. Any person desiring to intervene or protest in any of the above...

  16. 77 FR 70478 - RG Steel Wheeling, LLC, Wheeling Office, A Division Of RG Steel, LLC, Including On-Site Leased...

    Science.gov (United States)

    2012-11-26

    ... Unlimited and Green Energy Initiatives LLC, Including Workers Whose Wages Were Reported Through Severstal..., Wheeling Office, a division of RG Steel, LLC, including on-site leased workers from Pro Unlimited and Green Energy Initiatives, LLC, Wheeling, West Virginia (TA-W-81,880) and Mountain State Carbon, LLC, including...

  17. The effect on the transmission loss of a double wall panel of using helium gas in the gap

    Science.gov (United States)

    Atwal, M. S.; Crocker, M. J.

    The possibility of increasing the sound-power transmission loss of a double panel by using helium gas in the gap is investigated. The transmission loss of a panel is defined as ten times the common logarithm of the ratio of the sound power incident on the panel to the sound power transmitted to the space on the other side of the panel. The work is associated with extensive research being done to develop new techniques for predicting the interior noise levels on board high-speed advanced turboprop aircraft and reducing the noise levels with a minimum weight penalty. Helium gas was chosen for its inert properties and its low impedance compared with air. With helium in the gap, the impedance mismatch experienced by the sound wave will be greater than that with air in the gap. It is seen that helium gas in the gap increases the transmission loss of the double panel over a wide range of frequencies.

  18. Network inter-connectivity and capacity reservation behaviour: an investigation of the Belgian gas transmission network

    International Nuclear Information System (INIS)

    Cuijpers, Ch.; Woitrin, D.

    2009-01-01

    Lack of cross-border integration explains largely why natural gas markets remain basically national in scope, with levels of concentration similarly high as when the liberalization process commenced. This paper presents the results of an assessment of the upstream/downstream capacity of the Belgian natural gas transmission network which is highly interconnected with adjacent networks and fosters important transit activities. It is shown that the tendency to a better market coupling still suffers from important mismatches of capacity provisions on both sides of cross-border interconnections. Moreover, shippers use gas transmission networks more and more from a commercial portfolio perspective which goes beyond the traditional security of supply purpose of network designs. Capacity booking rates appear to be significantly higher than the underlying physical gas flows. From these findings, the paper contributes to a better understanding of the market barrier created by contractual congestion at cross-border interconnection points. The paper argues that contractual congestion is a symptom of suboptimal cooperation of adjacent network operators and lack of effective mechanisms to bring booked but non-used capacity back to the market, rather than an indicator for an overall need to increase investment budgets. (authors)

  19. Gas-phase synthesis of magnesium nanoparticles : A high-resolution transmission electron microscopy study

    NARCIS (Netherlands)

    Kooi, B.J.; Palasantzas, G.; de Hosson, J.T.M.

    2006-01-01

    Magnesium nanoparticles with size above 10 nm, prepared by gas-phase syntheses, were investigated by high-resolution transmission electron microscopy. The dominant particle shape is a hexagonal prism terminated by Mg(0002) and Mg{1010} facets. Oxidation of Mg yields a MgO shell (similar to 3 nm

  20. 78 FR 14528 - Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and...

    Science.gov (United States)

    2013-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11169-029] Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On November 20, 2012, Mayo Hydropower, LLC (transferor) and Avalon Hydropower...

  1. Gas data transmission system by satellite telephone; Systeme de transmission de donnees sur le gaz utilisant le telephone par satellite

    Energy Technology Data Exchange (ETDEWEB)

    Ogasawara, S.; Tanji, A. [Dengineer Co., Ltd (Japan); Akiyama, S. [Buyo Gas Company (Japan)

    2000-07-01

    Dengineer Co., Ltd. and Buyo Gas Co., Ltd. had been developing and using the data and alarm transmission system by public telephone since 1984, that was first practical use in Japan. It is very important for business management that adjusts the production value of gas by measuring gas pressures in each governor. Also, it is indispensable to know the accident of gas leakage or abnormal gas pressure quickly. But this convenient system is not spread yet in Japanese market cause of the following reasons. - Take time and cost for installation of terminal station. - Terminal station is apt to damage by thunder. - Big disaster must stop working this system. In order to solve those problems, we have developed and tested the system organized of the satellite telephone system and solar cells for power. This system will be very useful for wide place, not only Japanese market but also the area, which has no electricity and phone. Also, it will be convenient for international rescue as is able to access it from the foreign countries. (authors)

  2. 78 FR 49509 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit...

    Science.gov (United States)

    2013-08-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13625-003; Project No. 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit... and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC for...

  3. 78 FR 34091 - Wausau Paper Mills, LLC; Specialty Papers Acquisition, LLC; Notice of Application for Transfer of...

    Science.gov (United States)

    2013-06-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 2161-034; 2207-045] Wausau Paper Mills, LLC; Specialty Papers Acquisition, LLC; Notice of Application for Transfer of Licenses, and Soliciting Comments and Motions To Intervene On April 22, 2013, Wausau Paper Mills, LLC (transferor) and...

  4. 76 FR 19473 - Chrysler Financial Services Americas, LLC, a Subsidiary of FinCo Intermediate Holding Co., LLC...

    Science.gov (United States)

    2011-04-07

    ... Services Americas, LLC, a Subsidiary of FinCo Intermediate Holding Co., LLC, Troy Customer Contact Center; Troy, MI; Notice of Negative Determination on Reconsideration On September 21, 2010, the Department of... Co., LLC, Troy Customer Contact Center, Troy, Michigan (subject firm). The Department's Notice was...

  5. 75 FR 24747 - SCI, LLC/Zener-Rectifier Operations Division A Wholly Owned Subsidiary of SCI, LLC/ON...

    Science.gov (United States)

    2010-05-05

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-70,235] SCI, LLC/Zener-Rectifier... Adjustment Assistance on October 19, 2009, applicable to workers of SCI LLC/Zener-Rectifier, Operations... Technical Resources were employed on-site at the Phoenix Arizona location of SCI LLC/Zener-Rectifier...

  6. 75 FR 1049 - Wausau Paper Printing & Writing, LLC,

    Science.gov (United States)

    2010-01-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2533-046] Wausau Paper Printing & Writing, LLC, Wausau Paper Mills, LLC; Notice of Application for Transfer of License and... & Writing, LLC (transferor) and Wausau Paper Mills, LLC (transferee) filed an application for transfer of...

  7. 76 FR 4651 - Venice Gathering System, L.L.C.; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2011-01-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-58-000] Venice... on January 7, 2011, Venice Gathering System, L.L.C. (Venice), 1000 Louisiana, Suite 4300, Houston... existing 20- inch diameter natural gas supply lateral pipeline, offshore Louisiana, under Venice's blanket...

  8. 75 FR 51990 - CenterPoint Energy-Illinois Gas Transmission Company; Notice of Baseline Filing

    Science.gov (United States)

    2010-08-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-80-000] CenterPoint Energy--Illinois Gas Transmission Company; Notice of Baseline Filing August 17, 2010. Take notice that on August 12, 2010, the applicant listed above submitted their baseline filing of its Statement of Operating...

  9. 76 FR 45248 - PJM Interconnection, L.L.C., PJM Power Providers Group v. PJM Interconnection, L.L.C...

    Science.gov (United States)

    2011-07-28

    ...-002; Docket No. EL11-20-001] PJM Interconnection, L.L.C., PJM Power Providers Group v. PJM Interconnection, L.L.C.; Supplemental Notice of Staff Technical Conference On June 13, 2011, the Commission issued... Resources Services, Inc., Maryland Public Service Commission, Monitoring Analytics, L.L.C., National Rural...

  10. 75 FR 77670 - SuperMedia, LLC, Formerly Known as Idearc Media, LLC, a Subsidiary of SuperMedia Information...

    Science.gov (United States)

    2010-12-13

    ... Known as Idearc Media, LLC, a Subsidiary of SuperMedia Information Services, LLC Publishing Group, Troy... Subsidiary of SuperMedia Information Services, LLC, Troy, New York, to apply for Trade Adjustment Assistance..., Publishing Group, Troy, New York, who became totally or partially separated from employment on or after...

  11. Cost function for the natural gas transmission, industry: further considerations

    International Nuclear Information System (INIS)

    Massol, Olivier

    2009-01-01

    This article studies the cost function for the natural gas transmission industry. 60 years ago, Hollis B. Chenery published an important contribution that demonstrated how, in that particular industry, the production function of micro-economic theory can be rewritten with engineering variables (Chenery, 1949). In 2008, an article published in The Engineering Economist (Yepez, 2008) provided a refreshing revival on Chenery's seminal thoughts. In addition to a tribute to the late H.B. Chenery, this document offers some further comments and extensions on Yepez (2008). It provides a statistically estimated characterisation of the long-run scale economies and a discussion on the short-run economics of the duplication of existing equipments. As a first extension, we study the optimal design for infrastructure that is planned to transport a seasonally-varying flow of natural gas. The second extension analyzes the optimal degree of excess capacity to be built into a new infrastructure by a firm that expects a random rise in its output during the infrastructure's lifetime. (author)

  12. A multioutput LLC-type parallel resonant converter

    Science.gov (United States)

    Liu, Rui; Lee, C. Q.; Upadhyay, Anand K.

    1992-07-01

    When an LLC-type parallel resonant converter (LLC-PRC) operates above resonant frequency, the switching transistors can be turned off at zero voltage. Further study reveals that the LLC-PRC possesses the advantage of lower converter voltage gain as compared with the conventional PRC. Based on analytic results, a complete set of design curves is obtained, from which a systematic design procedure is developed. Experimental results from a 150 W 150 kHz multioutput LLC-type PRC power supply are presented.

  13. 77 FR 39695 - HollyFrontier Refining and Marketing LLC v. Osage Pipe Line Company, LLC; Notice of Complaint

    Science.gov (United States)

    2012-07-05

    ... Refining and Marketing LLC v. Osage Pipe Line Company, LLC; Notice of Complaint Take notice that on June 25...; 18 CFR 343.1(a) and 343.2(c), HollyFrontier Refining and Marketing LLC (Complainant) filed a formal... assistance with any FERC Online service, please email [email protected] , or call (866) 208-3676...

  14. 78 FR 36017 - MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-Operation Exemption-Hilco SP Rail, LLC

    Science.gov (United States)

    2013-06-14

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35725] MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-- Operation Exemption--Hilco SP Rail, LLC MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad (MCM), a noncarrier, has filed a verified notice of exemption...

  15. Environmental Transmission Electron Microscopy (ETEM) Studies of Single Iron Nanoparticle Carburization in Synthesis Gas

    DEFF Research Database (Denmark)

    Liu, Xi; Zhang, Chenghua; Li, Yongwang

    2017-01-01

    Structuralevolution of iron nanoparticles involving the formationand growth of iron carbide nuclei in the iron nanoparticle was directlyvisualized at the atomic level, using environmental transmission electronmicroscopy (TEM) under reactive conditions mimicking Fischer–Tropschsynthesis. Formation...... and electronenergy-loss spectra provides a detailed picture from initial activationto final degradation of iron under synthesis gas....

  16. 76 FR 387 - Atomic Safety and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility)

    Science.gov (United States)

    2011-01-04

    ... and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility) December 17, 2010... construction and operation of a gas centrifuge uranium enrichment facility--denoted as the Eagle Rock... site at http://www.nrc.gov/materials/fuel-cycle-fac/arevanc.html . These and other documents relating...

  17. 77 FR 42831 - Professional Transportation, Inc.-Asset Acquisition-CUSA ES, LLC and CUSA CSS, LLC

    Science.gov (United States)

    2012-07-20

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. MCF 21046] Professional Transportation, Inc.--Asset Acquisition--CUSA ES, LLC and CUSA CSS, LLC AGENCY: Surface Transportation Board, Department of Transportation. ACTION: Correction to Notice of Finance Application. On June 29, 2012, notice...

  18. A new integrated planning model for gas compression and transmission through a complex pipeline network; Um novo modelo de planejamento integrado de compressao e escoamento de gas para uma rede complexa

    Energy Technology Data Exchange (ETDEWEB)

    Iamashita, Edson K. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Galaxe, Frederico; Arica, Jose [Universidade Estadual do Norte Fluminense (UENF), Campos dos Goytacases, RJ (Brazil)

    2005-07-01

    The aim of this paper is to show a new approach to solve integrated gas balance planning problems that defines the best compression and transmission strategy for a system with a large number of platforms or compression units that are interlinked with the delivery points through a complex gas pipeline network. For solving the proposed optimization problem is used a genetic meta-heuristic technique, where the fitness function of the algorithm is the Profit function of the gas balance, being considered the incomes and costs besides the pipeline network constraints, representing the compression system and transmission network near to the real operational condition. Newton Raphson's method is used to solve the nonlinear system that represents the calculation of the pressure drop in the gas pipeline network that can contain various cycles. This model could be used for design and optimization of gas pipeline networks, as well as for the gas balance planning of an existent network looking for the profit maximization. (author)

  19. 78 FR 2990 - Bear Creek Storage Company, L.L.C.; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2013-01-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13-34-000] Bear Creek..., 2012, Bear Creek Storage Company, L.L.C. (Bear Creek), 569 Brookwood Village, Suite 749, Birmingham....208, 157.213 and 157.216 of the Commission's Regulations under the Natural Gas Act, and Bear Creek's...

  20. A method for measuring the local gas pressure within a gas-flow stage in situ in the transmission electron microscope

    International Nuclear Information System (INIS)

    Colby, R.; Alsem, D.H.; Liyu, A.; Kabius, B.

    2015-01-01

    Environmental transmission electron microscopy (TEM) has enabled in situ experiments in a gaseous environment with high resolution imaging and spectroscopy. Addressing scientific challenges in areas such as catalysis, corrosion, and geochemistry can require pressures much higher than the ∼20 mbar achievable with a differentially pumped environmental TEM. Gas flow stages, in which the environment is contained between two semi-transparent thin membrane windows, have been demonstrated at pressures of several atmospheres. However, the relationship between the pressure at the sample and the pressure drop across the system is not clear for some geometries. We demonstrate a method for measuring the gas pressure at the sample by measuring the ratio of elastic to inelastic scattering and the defocus of the pair of thin windows. This method requires two energy filtered high-resolution TEM images that can be performed during an ongoing experiment, at the region of interest. The approach is demonstrated to measure greater than atmosphere pressures of N 2 gas using a commercially available gas-flow stage. This technique provides a means to ensure reproducible sample pressures between different experiments, and even between very differently designed gas-flow stages. - Highlights: • Method developed for measuring gas pressure within a gas-flow stage in the TEM. • EFTEM and CTF-fitting used to calculate amount and volume of gas. • Requires only a pair of images without leaving region of interest. • Demonstrated for P > 1 atm with a common commercial gas-flow stage

  1. Recommendations on X80 steel for the design of hydrogen gas transmission pipelines

    International Nuclear Information System (INIS)

    Briottet, L.; Batisse, R.; De Dinechin, G.; Langlois, P.; Thiers, L.

    2012-01-01

    By limiting the pipes thickness necessary to sustain high pressure, high-strength steels could prove economically relevant for transmitting large gas quantities in pipelines on long distance. Up to now, the existing hydrogen pipelines have used lower-strength steels to avoid any hydrogen embrittlement. The CATHY-GDF project, funded by the French National Agency for Research, explored the ability of an industrial X80 grade for the transmission of pressurized hydrogen gas in large diameter pipelines. This project has developed experimental facilities to test the material under hydrogen gas pressure. Indeed, tensile, toughness, crack propagation and disc rupture tests have been performed. From these results, the effect of hydrogen pressure on the size of some critical defects has been analyzed allowing proposing some recommendations on the design of X80 pipe for hydrogen transport. Cost of Hydrogen transport could be several times higher than natural gas one for a given energy amount. Moreover, building hydrogen pipeline using high grade steels could induce a 10 to 40% cost benefit instead of using low grade steels, despite their lower hydrogen susceptibility. (authors)

  2. 75 FR 60138 - Chrysler Financial Services Americas, LLC, a Subsidiary of Finco Intermediate Holding Co., LLC...

    Science.gov (United States)

    2010-09-29

    ... Services Americas, LLC, a Subsidiary of Finco Intermediate Holding Co., LLC, Troy Customer Contact Center, Troy, Michigan; Notice of Affirmative Determination Regarding Application for Reconsideration By... workers at Chrysler Financial Services, Troy, Michigan were engaged in activities that initiated the need...

  3. Electrochemical Noise Sensors for Detection of Localized and General Corrosion of Natural Gas Transmission Pipelines. Final Report for the Period July 2001-October 2002

    Energy Technology Data Exchange (ETDEWEB)

    Bullard, Sophie J.; Covino, Jr., Bernard S.; Russell, James H.; Holcomb, Gordon R.; Cramer, Stephen D.; Ziomek-Moroz, Margaret

    2002-12-01

    The U.S. Department of Energy, National Energy Technology Laboratory funded a Natural Gas Infrastructure Reliability program directed at increasing and enhancing research and development activities in topics such as remote leak detection, pipe inspection, and repair technologies and materials. The Albany Research Center (ARC), U.S. Department of Energy was funded to study the use of electrochemical noise sensors for detection of localized and general corrosion of natural gas transmission pipelines. As part of this, ARC entered into a collaborative effort with the corrosion sensor industry to demonstrate the capabilities of commercially available remote corrosion sensors for use with the Nation's Gas Transmission Pipeline Infrastructure needs. The goal of the research was to develop an emerging corrosion sensor technology into a monitor for the type and degree of corrosion occurring at key locations in gas transmission pipelines.

  4. 78 FR 71597 - Combined Notice of Filings

    Science.gov (United States)

    2013-11-29

    ... America. Description: Negotiated Rate--Village of Bethany to be effective 12/1/2013. Filed Date: 11/14/13...: Natural Gas Pipeline Company of America. Description: Cities of Pickneyville and Salem--Negotiated Rate to... p.m. ET 11/27/13. Docket Numbers: RP14-173-000. Applicants: Discovery Gas Transmission LLC...

  5. Gas Regional Initiative. North West Regional Energy Market. Transmission Transparency Project. First Implementation Report

    International Nuclear Information System (INIS)

    2008-07-01

    The purpose of this report is to comment on the implementation of the TSO Transmission Transparency Project. In December 2007 sixteen TSOs presented a project plan which committed them to publishing information on capacity availability and gas flows at crossborder interconnection points in the North-West gas region. The data types to be published were agreed between TSOs and network users. It was agreed that TSOs would release new information on capacity and actual gas flows at crossborder interconnection points. The TSOs have committed to publishing the agreed information by three project milestones May, September or December 2008. At the end of May 2008 the TSOs submitted initial data to Ofgem (Office of the Gas and Electricity Markets) on implementation. This report presents the data submitted by the TSOs, provides comment on implementation progress and explains the next steps. This report does not approve or guarantee the accuracy of the data submitted by TSOs

  6. 78 FR 4401 - Orders Granting Authority To Import and Export Natural Gas, To Import and Export Liquefied...

    Science.gov (United States)

    2013-01-22

    ... MARKETING, LLC 12-99-LNG PETROCHINA INTERNATIONAL (CANADA) TRADING LTD......... 12-104-NG PEMEX GAS Y... export natural gas Ltd. from/to Canada. 3154 10/04/12 12-110-NG Pemex Gas y Order granting blanket...

  7. A cost function for the natural gas transmission industry: further considerations

    International Nuclear Information System (INIS)

    Massol, O.

    2009-09-01

    This article studies the cost function for the natural gas transmission industry. 60 years ago, Hollis B. Chenery published an important contribution that demonstrated how, in that particular industry, the production function of micro-economic theory can be rewritten with engineering variables (Chenery, 1949). In 2008, an article published in The Engineering Economist (Yepez, 2008) provided a refreshing revival on Chenery's seminal thoughts. In addition to a tribute to the late H.B. Chenery, this document offers some further comments and extensions on Yepez (2008). It provides a statistically estimated characterisation of the long-run scale economies and a discussion on the short-run economics of the duplication of existing equipments. As a first extension, we study the optimal design for infrastructure that is planned to transport a seasonally-varying flow of natural gas. The second extension analyzes the optimal degree of excess capacity to be built into a new infrastructure by a firm that expects a random rise in its output during the infrastructure's lifetime. (author)

  8. 76 FR 4893 - FFP Missouri 13, LLC, Grays Hydro, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2011-01-27

    .... 13772-000] FFP Missouri 13, LLC, Grays Hydro, LLC; Notice Announcing Preliminary Permit Drawing January... Commission, or her designee, will, by random drawing, determine the filing priority for the two applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission...

  9. Transmission electron microscope examination of rare-gas bubbles in metals: analysis of observed contrast effects

    International Nuclear Information System (INIS)

    Levy, V.

    1964-01-01

    Metallic samples containing rare gas bubbles have been examined by transmission electron microscopy. The different features of the contrast patterns of the bubbles have been explained by the dynamical theory of contrast, assuming that the bubble behaves as a hole in the metal. Experimental results are in good agreement with the theory. (author) [fr

  10. 77 FR 9231 - FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    .... 13826-000] FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  11. Corrosion Prevention And Control In High Pressure Oil And Gas Transmission Pipelines

    International Nuclear Information System (INIS)

    Hafez, M.T.; Radwan, M.H.; Jones, D.G.

    2004-01-01

    At the start of the 1990s there were concerns over the increasing threat of corrosion to the integrity of high-pressure oil and gas transmission pipelines. For example: corrosion was the major cause of reportable incidents in North America (1]. Corrosion was the major cause of pipeline failure in the Gulf of Mexico [2]. Corrosion in a North American onshore oil pipeline had required over $1 billion in repairs(3]. Internal corrosion along the complete length of pipelines had resulted in replacement[4] . However, the worldwide published failure statistics indicate that the incidents of corrosion are not increasing year on year(5-9]. Indeed, CONCA WE[8,9] statistics (for pipelines In Western Europe) show that the failure rate from corrosion (the most likely failure mode with increasing age) has not increased with pipeline age (Figure 1). In fact the statistics for gas pipelines in Europe

  12. 76 FR 39870 - PJM Interconnection, LLC; PJM Power Providers Group v. PJM Interconnection, LLC; Notice of Date...

    Science.gov (United States)

    2011-07-07

    .... EL11-20-001] PJM Interconnection, LLC; PJM Power Providers Group v. PJM Interconnection, LLC; Notice of... Sell Offers for Planned Generation Capacity Resources submitted into PJM's Reliability Pricing Model... presents an opportunity to exercise buyer market power; (2) whether the Fixed Resource Requirement (FRR...

  13. 77 FR 10740 - Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-23

    ...] Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing The..., will conduct a random drawing to determine the filing priority of the applicants identified in this... regulations.\\2\\ The priority established by this drawing will be used to determine which applicant, among...

  14. 75 FR 21680 - GE-Hitachi Global Laser Enrichment LLC;

    Science.gov (United States)

    2010-04-26

    ... Global Laser Enrichment LLC; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by... over the following proceeding: GE-Hitachi Global Laser Enrichment LLC (GLE Commercial Facility) This... application of GE-Hitachi Global Laser Enrichment LLC for a license to possess and use source, byproduct, and...

  15. Gas system 2016: Press conference 17 January 2017 + Gas consumption by administrative regions

    International Nuclear Information System (INIS)

    2017-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents some key figures about GRTgaz activity in 2016: A first part presents the national data about gas consumption, production of gas-fired power plants, new gas uses (diesel-gas substitution, biomethane..) and their environmental impacts, and the development of the Internet open-data platform. A second part presents the regional gas consumptions with a focus on industrial clients

  16. 78 FR 4842 - Linden VFT, LLC v. Brookfield Energy Marketing, LP, Cargill Power Markets, LLC; Notice of Complaint

    Science.gov (United States)

    2013-01-23

    ... v. Brookfield Energy Marketing, LP, Cargill Power Markets, LLC; Notice of Complaint Take notice that... Brookfield Energy Marketing, LP and Cargill Power Markets, LLC (Respondents) alleging that, Respondents... subscribed docket(s). For assistance with any FERC Online service, please email [email protected

  17. Requirements for gas quality and gas appliances

    NARCIS (Netherlands)

    Levinsky, Howard; Gersen, Sander; Kiewiet, Bert

    2015-01-01

    Introduction The gas transmission network in the Netherlands transports two different qualities of gas, low-calorific gas known as G-gas or L-gas and, high calorific gas (H-gas). These two gas qualities are transported in separate networks, and are connected by means of five blending and conversion

  18. 77 FR 48145 - Cameron Interstate Pipeline, LLC, Cameron LNG, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2012-08-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PF12-12-000; PF12-13-000] Cameron Interstate Pipeline, LLC, Cameron LNG, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Request for Comments on Environmental Issues,...

  19. 76 FR 67174 - Arkansas Electric Cooperative Corp., Riverbank Hydro No. 9 LLC, Solia 3 Hydroelectric LLC, Lock...

    Science.gov (United States)

    2011-10-31

    ...; 14166-000; 14180-000; 14193-000] Arkansas Electric Cooperative Corp., Riverbank Hydro No. 9 LLC, Solia 3... May 2, 2011, Arkansas Electric Cooperative Corp. (Arkansas Electric), Riverbank Hydro No. 9 LLC.... Krouse, Hydro Green Energy, 5090 Richmond Avenue 390, Houston, TX 77056. (877) 556-6566 x 709. FFP 2's...

  20. 75 FR 20591 - AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC; Notice of Final General Conformity...

    Science.gov (United States)

    2010-04-20

    ...] AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC; Notice of Final General Conformity... revised draft Final General Conformity Determination (GCD) for Pennsylvania to assess the potential air... the above-referenced dockets. In accordance with the General Conformity Regulations under the Code of...

  1. 76 FR 40945 - Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, Entergy Nuclear...

    Science.gov (United States)

    2011-07-12

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0150; Docket Nos. 50-003, 50-247, and 50-286; License Nos. DPR-5, DPR-26, and DPR-64] Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, Entergy Nuclear Operations, Inc.; Receipt of Request for Action Notice is hereby given that by petition...

  2. Determination of the longest permissible distance between expansion compensators in gas transmission pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Huening, R [Fachhochschule Muenster, Burgsteinfurt (Germany, F.R.). Fachbereich Versorgungstechnik

    1977-01-01

    In order to effectively protect long-distance gas pipelines against mountain damage in the areas in which underground mining is done, expansion compensators must be built in at certain distances. The tests to determine the slippage resistance and the highest permissible distance of expanders Lsub(max) in a transmission line NW 600 having a plastic insulation are described in this work. In addition, a way of calculating the Lsub(max) value from the existing data for pipes of varying diameter and different insulating material is shown.

  3. Method and system for a gas tube switch-based voltage source high voltage direct current transmission system

    Science.gov (United States)

    She, Xu; Chokhawala, Rahul Shantilal; Zhou, Rui; Zhang, Di; Sommerer, Timothy John; Bray, James William

    2016-12-13

    A voltage source converter based high-voltage direct-current (HVDC) transmission system includes a voltage source converter (VSC)-based power converter channel. The VSC-based power converter channel includes an AC-DC converter and a DC-AC inverter electrically coupled to the AC-DC converter. The AC-DC converter and a DC-AC inverter include at least one gas tube switching device coupled in electrical anti-parallel with a respective gas tube diode. The VSC-based power converter channel includes a commutating circuit communicatively coupled to one or more of the at least one gas tube switching devices. The commutating circuit is configured to "switch on" a respective one of the one or more gas tube switching devices during a first portion of an operational cycle and "switch off" the respective one of the one or more gas tube switching devices during a second portion of the operational cycle.

  4. 78 FR 46938 - St. Paul Park Refining Co. LLC v. Enbridge Pipelines (North Dakota) LLC; Notice of Complaint

    Science.gov (United States)

    2013-08-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR13-28-000] St. Paul Park..., 2013, St. Paul Park Refining Co. LLC (Complainant) filed a formal complaint against Enbridge Pipelines... regulatory basis. St. Paul Park Refining Co. LLC certifies that copies of the complaint were served on the...

  5. 76 FR 67721 - PNE Energy Supply, LLC;

    Science.gov (United States)

    2011-11-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-186-000] PNE Energy Supply, LLC; Supplemental Notice that Initial Market-Based Rate Filing Includes Request for Blanket... Supply, LLC's application for market-based rate authority, with an accompanying rate tariff, noting that...

  6. 76 FR 10350 - Kern River Gas Transmission Company; Notice of Intent To Prepare an Environmental Assessment for...

    Science.gov (United States)

    2011-02-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-46-000] Kern River Gas Transmission Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Mountain Pass Lateral Project, Request for Comments on Environmental Issues and Notice of Onsite Environmental Review The staff of the Federal Energy...

  7. British Gas plans global gas unit expansion

    International Nuclear Information System (INIS)

    Vielvoye, R.

    1991-01-01

    This paper reports on developing a global gas business, a British Gas plc's strategy for evolving a state owned U.K. gas company to a privatized worldwide oil and gas giant. By 2000, BG's global gas business is expected to provide 20% of its revenues, compared with 40% each from its exploration and production operations and its U.K. gas business. The global gas unit (GGU) plans to meet its targets mainly through acquiring holdings in gas transmission and distribution companies around the world. In the 12 months since GGU was established, it has made two such major acquisitions in this area. BG acquired Consumers Gas Co., Ltd., Ontario, Canada's biggest natural gas distribution company, for $943.5 million. It also took a 10% stake in Catalana de Gas SA, Barcelona, the largest privately owned gas utility in Spain and in terms of number of customers, the fourth largest in western Europe. BG also is targeting additional revenues from developing gas fired cogeneration systems in developing countries with gas reserves but no established transmission and distribution systems

  8. Gas system 2015: Press conference 21 January 2016 + Gas consumption by administrative regions

    International Nuclear Information System (INIS)

    2016-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents some key figures about GRTgaz activity in 2015: Gas consumption resumed despite warm conditions in 2015. Gas demand for power generation in gas-fired power plants has strongly increased, due to favourable economic conditions. 2015 was characterised by the lowest LNG imports to France ever, which entailed a still intensive use of the North-South link, despite transits to Spain and Italy back to 5 year average level. New gas uses and biomethane permitted to avoid 490,000 tonnes of CO 2 emissions in 2015. A second part presents the regional gas consumptions by administrative regions

  9. 78 FR 8588 - Rg Steel Sparrows Point LLC, Formerly Known as Severstal Sparrows Point LLC, a Subsidiary of RG...

    Science.gov (United States)

    2013-02-06

    ... Consulting, Crown Security, Eastern Automation, EDS(HP), Teksystems, URS Corporation, and B More Industrial... from B More Industrial Services LLC were employed on-site at the Sparrows Point, Maryland location of RG Steel Sparrows Point LLC. The Department has determined that these workers from B More Industrial...

  10. 77 FR 514 - Notice of Availability of the Record of Decision for the North Steens 230 Kilovolt Transmission...

    Science.gov (United States)

    2012-01-05

    ... subsidiary of Columbia Energy Partners, LLC, filed right-of-way (ROW) applications for ROWs with the BLM and... transmission system near Diamond Junction, Oregon. The ROD approves the BLM-preferred Alternative, now the... Project substation, south of Diamond, Oregon and connect to Harney Electric Cooperative's existing 115-kV...

  11. Transmission Line Series Compensation for Wind Energy Transmission

    International Nuclear Information System (INIS)

    Palanichamy, C; Wong, Y C

    2015-01-01

    Wind energy has demonstrated to be a clean, copious and absolutely renewable source of energy, and the large penetration of it into the power grid indicates that wind energy is considered an effective means of power generation, Transmission of wind energy from remote locations to load centers necessitates long transmission lines. Series compensation is a proven and economical transmission solution to address system power transfer strength, grid stability, and voltage profile issues of long transmission lines. In this paper, a programmable approach to determine the capacitive reactance of series capacitor and optimum location for its placement to achieve maximum power transfer gas been presented. The respective program with sample solutions has been provided for real-time applications. (paper)

  12. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Science.gov (United States)

    2011-10-05

    ... Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and a preliminary application document to license its proposed Sutton Hydroelectric Project No. 12693. The project would be located at the U.S. Army Corps of Engineers' (Corps...

  13. SAInt – A novel quasi-dynamic model for assessing security of supply in coupled gas and electricity transmission networks

    NARCIS (Netherlands)

    Pambour, Kwabena Addo; Cakir Erdener, Burcin; Bolado-Lavin, Ricardo; Dijkema, Gerhard P.J.

    2017-01-01

    The integration of renewable energy sources into existing electric power systems is connected with an increased interdependence between natural gas and electricity transmission networks. To analyse this interdependence and its impact on security of supply, we developed a novel quasi-dynamic

  14. 76 FR 35882 - Paulding Wind Farm II, LLC, et al.;

    Science.gov (United States)

    2011-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG11-61-000, etc.] Paulding Wind Farm II, LLC, et al.; Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Paulding Wind Farm II LLC EG11-61-000 Macho Springs Power I, LLC EG11-63-000 Alta Wind III Owner Lessor A...

  15. Gas-phase synthesis of magnesium nanoparticles: A high-resolution transmission electron microscopy study

    International Nuclear Information System (INIS)

    Kooi, B. J.; Palasantzas, G.; De Hosson, J. Th. M.

    2006-01-01

    Magnesium nanoparticles with size above 10 nm, prepared by gas-phase syntheses, were investigated by high-resolution transmission electron microscopy. The dominant particle shape is a hexagonal prism terminated by Mg(0002) and Mg(1010) facets. Oxidation of Mg yields a MgO shell (∼3 nm thick), which has an orientation relation with the Mg. Inhomogeneous facet oxidation influences their growth kinetics resulting in a relatively broad size and shape distribution. Faceted voids between Mg and MgO shells indicate a fast outward diffusion of Mg and vacancy rearrangement into voids. The faceting of polar (220) planes is assisted by electron irradiation

  16. 78 FR 12049 - The East Ohio Gas Company d/b/a Dominion East Ohio; Dominion Transmission, Inc.; Notice of...

    Science.gov (United States)

    2013-02-21

    ... Gas Company d/b/a Dominion East Ohio; Dominion Transmission, Inc.; Notice of Abbreviated Application for Limited Amendment to Certificate of Public Convenience and Necessity On February 11, 2013, The...''), filed an abbreviated application for limited amendment to certificate of public convenience and...

  17. 77 FR 70159 - Marble River, LLC v. Noble Clinton Windpark I, LLC, Noble Ellenburg Windpark, LLC, Noble...

    Science.gov (United States)

    2012-11-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-20-000] Marble River... Commission's (Commission) Rules of Practice and Procedure, Marble River, LLC (Marble River or Complainant.... (NYISO or Respondent), alleging that Noble failed to pay Marble River for headroom created by common...

  18. 78 FR 75557 - CE FLNG, LLC, CE Pipeline, LLC; Notice of Intent To Prepare an Environmental Impact Statement for...

    Science.gov (United States)

    2013-12-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-11-000] CE FLNG, LLC, CE Pipeline, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Planned CE FLNG Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission ...

  19. Numerical Calculation of Transient Thermal Characteristics in Gas-Insulated Transmission Lines

    Directory of Open Access Journals (Sweden)

    Hongtao Li

    2013-11-01

    Full Text Available For further knowledge of the thermal characteristics in gas-insulated transmission lines (GILs installed above ground, a finite-element model coupling fluid field and thermal field is established, in which the corresponding assumptions and boundary conditions are given.  Transient temperature rise processes of the GIL under the conditions of variable ambient temperature, wind velocity and solar radiation are respectively investigated. Equivalent surface convective heat transfer coefficient and heat flux boundary conditions are updated in the analysis process. Unlike the traditional finite element methods (FEM, the variability of the thermal properties with temperature is considered. The calculation results are validated by the tests results reported in the literature. The conclusion provides method and theory basis for the knowledge of transient temperature rise characteristics of GILs in open environment.

  20. 76 FR 16405 - Notice of Attendance at PJM INterconnection, L.L.C., Meetings

    Science.gov (United States)

    2011-03-23

    ... INterconnection, L.L.C., Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C., (PJM...: Docket No. EL05-121, PJM Interconnection, L.L.C. Docket No. ER06-456, PJM Interconnection, L.L.C. Docket...

  1. 78 FR 19259 - Notice of Attendance at PJM Interconnection, L.L.C. Meetings

    Science.gov (United States)

    2013-03-29

    ... Interconnection, L.L.C. Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C. (PJM... proceedings: Docket No. EL05-121, PJM Interconnection, L.L.C. Docket No. EL08-14, Black Oak Energy LLC, et al...

  2. Methane Emissions from the Natural Gas Transmission and Storage System in the United States.

    Science.gov (United States)

    Zimmerle, Daniel J; Williams, Laurie L; Vaughn, Timothy L; Quinn, Casey; Subramanian, R; Duggan, Gerald P; Willson, Bryan; Opsomer, Jean D; Marchese, Anthony J; Martinez, David M; Robinson, Allen L

    2015-08-04

    The recent growth in production and utilization of natural gas offers potential climate benefits, but those benefits depend on lifecycle emissions of methane, the primary component of natural gas and a potent greenhouse gas. This study estimates methane emissions from the transmission and storage (T&S) sector of the United States natural gas industry using new data collected during 2012, including 2,292 onsite measurements, additional emissions data from 677 facilities and activity data from 922 facilities. The largest emission sources were fugitive emissions from certain compressor-related equipment and "super-emitter" facilities. We estimate total methane emissions from the T&S sector at 1,503 [1,220 to 1,950] Gg/yr (95% confidence interval) compared to the 2012 Environmental Protection Agency's Greenhouse Gas Inventory (GHGI) estimate of 2,071 [1,680 to 2,690] Gg/yr. While the overlap in confidence intervals indicates that the difference is not statistically significant, this is the result of several significant, but offsetting, factors. Factors which reduce the study estimate include a lower estimated facility count, a shift away from engines toward lower-emitting turbine and electric compressor drivers, and reductions in the usage of gas-driven pneumatic devices. Factors that increase the study estimate relative to the GHGI include updated emission rates in certain emission categories and explicit treatment of skewed emissions at both component and facility levels. For T&S stations that are required to report to the EPA's Greenhouse Gas Reporting Program (GHGRP), this study estimates total emissions to be 260% [215% to 330%] of the reportable emissions for these stations, primarily due to the inclusion of emission sources that are not reported under the GHGRP rules, updated emission factors, and super-emitter emissions.

  3. 78 FR 16500 - Rolling Bay, LLC and Indus; Transfer of Data

    Science.gov (United States)

    2013-03-15

    ... contract to perform work for OPP, and access to this information will enable Rolling Bay, LLC and its subcontractor, Indus, to fulfill the obligations of the contract. DATES: Rolling Bay, LLC and its subcontractor... Under Contract No. GS-35F-0072Y, Rolling Bay, LLC and its subcontractor, Indus, will: Capture data that...

  4. Gaz Metropolitain's experience in regards to transmission access

    International Nuclear Information System (INIS)

    Noel, J.-P.

    1994-01-01

    The natural gas industry in Canada is briefly reviewed as it applies to the sale of transported gas in Quebec. The deregulation of the industry which occurred in 1985 brought many changes to the relationships among natural gas consumers, suppliers, transmission companies, and distribution utilities. It is noted that only the producers' natural gas sale price has been deregulated, not the rates of transmission companies or distributors. Deregulation offered two possibilities for natural gas users in Quebec: the client can contract a transmission service between the Alberta (source of supply) and Quebec borders, separately from contracting a delivery service from Gaz Metropolitain, the company supplying the vast majority of natural gas in Quebec; or the client can contract those two services from Gaz Metropolitain who then gathers the gas at the Alberta border. The adoption of Gaz Metropolitain services to meet the need for transmission access are discussed in the areas of supply contracts, and services offered (buy/sell, rate unbundling, delivery). The opportunities and risks for the customer are assessed in the areas of costs, speculation on transportation capacity, operational flexibility, and the possiblity of unused capacities. Opportunities and issues for the distributor include maintenance of client satisfaction, shortening of the duration of contracts, maintenance of the role of the distributor in natural gas sales, take-or-pay commitments, rate unbundling, accounting methods, inventories, and pricing

  5. A Mathematical Model of the Modified Atmosphere Packaging (MAP System for the Gas Transmission Rate of Fruit Produce

    Directory of Open Access Journals (Sweden)

    Li Li

    2010-01-01

    Full Text Available A mathematical model to predict oxygen, carbon dioxide, and water vapour exchanges in non-perforated and micro-perforated modified atmosphere packaging films has successfully been proposed. The transmission rate of gases was measured for films with thickness of 0.03 and 0.05 mm, perforation diameters of 0.5 and 2.0 mm, and temperatures of 0, 10 and 20 °C. Under most conditions, the increase in temperature and perforation diameter increased the transmission rate of oxygen, carbon dioxide, and water vapour, whereas the increase in film thickness decreased the transmission rate of the various gases. Validation of the proposed modified atmosphere packaging model was found to yield good prediction for gas concentrations and percentage losses in the mass of the produce after comparison with the experimental results of modified atmosphere packaging for tomato (Lycopersicon esculentum.

  6. 75 FR 40815 - PJM Interconnection, L.L.C.; Notice of Filing

    Science.gov (United States)

    2010-07-14

    ... Interconnection, L.L.C.; Notice of Filing July 7, 2010. Take notice that on July 1, 2010, PJM Interconnection, L.L.C. (PJM) filed revised sheets to Schedule 1 of the Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. (Operating Agreement) and the parallel provisions of Attachment K--Appendix of the PJM...

  7. 75 FR 22773 - PJM Interconnection, L.L.C.; Notice of Filing

    Science.gov (United States)

    2010-04-30

    ... Interconnection, L.L.C.; Notice of Filing April 23, 2010. Take notice that on April 22, 2010, PJM Interconnection, L.L.C. (PJM) filed revised tariff sheets to its Schedule 1 of the Amended and Restated Operating... (Commission) March 23, 2010 Order on Compliance Filing, PJM Interconnection, L.L.C., 130 FERC ] 61,230 (2010...

  8. 77 FR 34378 - PJM Interconnection, L.L.C.; Notice of Complaint

    Science.gov (United States)

    2012-06-11

    ... Interconnection, L.L.C.; Notice of Complaint Take notice that on June 1, 2012, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824(e), PJM Interconnection, L.L.C. (PJM) filed proposed revisions to the Amended and Restated Operating Agreement of PJM Interconnection L.L.C. (Operating Agreement) to...

  9. Gas development plan - Estonia

    International Nuclear Information System (INIS)

    1994-06-01

    The total supply of natural gas to Estonia is provided by the Russian company ''Lentransgas'', a 10 year contract is under negotiation. The gas transmission system is physically a part of the transmission network in the Baltic region which previously operated as an integral part of the USSR gas transmission system. The potential market is too small to justify investment in an alternative pipeline from the North Sea. The general reduction in purchasing power in the former COMECON countries has resulted in a decreased industrial production in Estonia and lead to a steep decline in natural gas consumption in all sectors except households. The Danish firm ''Dansk Olie og Naturgas A/S'' has been requested to assist the Estonian company ''AS Eesti Gaas J.S.C.'' in preparing a gas development plan for Estonia. Phase 1 of this plan aims to provide a detailed description of the status of the existing situation under the headings of gas supply and demand, transmission and distribution, economy and organization. The most important problems related to the current transition of the Estonian gas sector towards operation under market conditions are addressed, focussing on gas supply and market conditions, flow control and metering. The general organization of the gas sector in Estonia is described and possible models for future organization are discussed. Some recommendations are given and areas in need of further investigation are identified. (AB)

  10. 78 FR 49501 - Combined Notice of Filings

    Science.gov (United States)

    2013-08-14

    ... Numbers: RP13-1177-000. Applicants: Garden Banks Gas Pipeline, LLC. Description: Compliance with New ACA...: Central Kentucky Transmission Company. Description: ACA 2013 to be effective 10/1/2013. Filed Date: 8/1/13... intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers...

  11. 76 FR 36532 - Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North...

    Science.gov (United States)

    2011-06-22

    ... Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, Horizon Wind...), Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, and Horizon Wind Energy LLC (Complainants) filed a formal complaint against Bonneville Power Administration...

  12. 77 FR 74179 - Stingray Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-12-13

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on November 26, 2012, Stingray Pipeline Company, L.L.C. (Stingray), 1100 Louisiana, Suite 3300, Houston, Texas 77002, filed in the above... Roney, Manager--Regulatory Affairs, Stingray Pipeline Company, L.L.C., 1100 Louisiana, Suite 3300...

  13. 75 FR 33296 - Columbia Gulf Transmission Company; Notice of Filing

    Science.gov (United States)

    2010-06-11

    ... Transmission Company; Notice of Filing June 2, 2010. Take notice that on May 20, 2010, Columbia Gulf..., pursuant to section 7(c) of the Natural Gas Act (NGA), for a certificate of public convenience and... of its existing transmission system to transport unprocessed gas (wet gas) near Centerville...

  14. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  15. 76 FR 76153 - Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC...

    Science.gov (United States)

    2011-12-06

    ...] Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC, Mesquite Solar 1, LLC, Copper Crossing Solar LLC, Copper Mountain Solar 1, LLC, Pinnacle Wind, LLC, Bellevue... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG11-115-000, EG11-116-000...

  16. 76 FR 71961 - Elba Express Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-11-000] Elba Express Company, L.L.C.; Notice of Application Take notice that on October 31, 2011, Elba Express Company, L.L.C... directed to Glenn A. Sheffield, Director, Rates & Regulatory Affairs, Elba Express Company, L.L.C., 569...

  17. 75 FR 51989 - Southern LNG Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2010-08-24

    ... Company, L.L.C.; Notice of Application August 16, 2010. Take notice that on August 4, 2010, Southern LNG Company, L.L.C. (Southern LNG), Post Office Box 2563, Birmingham, Alabama 35202-2563, filed in the above.... Sheffield, Director--Rates and Regulatory, Southern LNG Company, L.L.C., 569 Brookwood Village, Suite 501...

  18. 77 FR 56837 - Enterprise Intrastate LLC; Notice of Filing

    Science.gov (United States)

    2012-09-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR12-34-000] Enterprise Intrastate LLC; Notice of Filing Take notice that on September 6, 2012, Enterprise Intrastate LLC (Enterprise.... Enterprise Intrastate is revising its SOC to replace all references to ``Enterprise Intrastate L.P.'' with...

  19. Multi-stage LLC resonant converters designed for wide output voltage ranges

    OpenAIRE

    Tsang, C.-W.; Bingham, C. M.; Foster, M. P.; Stone, D. A.; Leech, J. M.

    2016-01-01

    The paper describes a novel multi-stage LLC resonant converter topology for facilitating wide output voltage ranges. This is achieved by combining the gain range of a capacitor-diode clamped LLC resonant converter with that of a traditional LLC resonant converter. A prototype converter is designed and commissioned to illustrate the design procedure and demonstrate resulting operational characteristics. Experimental results are used to show operational characteristics of the proposed conver...

  20. 76 FR 13271 - DeQueen and Eastern Railroad, LLC-Corporate Family Transaction Exemption-Texas, Oklahoma...

    Science.gov (United States)

    2011-03-10

    ... Eastern Railroad, LLC--Corporate Family Transaction Exemption--Texas, Oklahoma & Eastern Railroad, LLC DeQueen and Eastern Railroad, LLC (DQ&E) and Texas, Oklahoma & Eastern Railroad, LLC (TOE), have filed a... the competitive balance with carriers outside the corporate family. Under 49 U.S.C. 10502(g), the...

  1. Natural gas pipeline technology overview.

    Energy Technology Data Exchange (ETDEWEB)

    Folga, S. M.; Decision and Information Sciences

    2007-11-01

    The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by

  2. Consistency Analysis and Data Consultation of Gas System of Gas-Electricity Network of Latvia

    Science.gov (United States)

    Zemite, L.; Kutjuns, A.; Bode, I.; Kunickis, M.; Zeltins, N.

    2018-02-01

    In the present research, the main critical points of gas transmission and storage system of Latvia have been determined to ensure secure and reliable gas supply among the Baltic States to fulfil the core objectives of the EU energy policies. Technical data of critical points of the gas transmission and storage system of Latvia have been collected and analysed with the SWOT method and solutions have been provided to increase the reliability of the regional natural gas system.

  3. 78 FR 38027 - Wilkesboro Hydroelectric Company, LLC; Wilkesboro Hydropower, LLC; Notice of Application for...

    Science.gov (United States)

    2013-06-25

    ...: Mr. Kevin Edwards, Wilkesboro Hydropower, LLC, 1000 CN Smith Mill Road, Stoneville, NC 27048.../elibrary.asp . Enter the docket number (P-12642) in the docket number field to access the document. For...

  4. Rock Equity Holdings, LLC

    Science.gov (United States)

    The EPA is providing notice of an Administrative Penalty Assessment in the form of an Expedited Storm Water Settlement Agreement against Rock Equity Holdings, LLC, for alleged violations at The Cove at Kettlestone/98th Street Reconstruction located at 3015

  5. Investigation on potential SCC in gas transmission pipeline in China

    Energy Technology Data Exchange (ETDEWEB)

    Jian, S. [Petroleum Univ., Beijing (China); Zupei, Y.; Yunxin, M. [China Petroleum Pipeline Corp., Beijing (China). Science and Technology Center

    2004-07-01

    Stress corrosion cracking (SCC) is a common phenomenon that occurs on the outer surfaces of buried pipelines. This paper investigated aspects of SCC on 3 transmission pipelines on the West-East Gas Pipeline Project in China. The study was comprised of 3 different investigations: (1) an investigation of SCC cases on constructed pipelines; (2) an evaluation of SCC sensitivity of pipeline steels in typical soil environments; and (3) an analysis of soil environments and operation conditions of western pipelines. The study included a review of pipeline corrosion investigations, as well as an examination of pipeline failure cases. Investigative digs were conducted at 21 sites to test soil chemistries. Slow strain rate stress were conducted to evaluate SCC sensitivity of steel pipelines used in China. Potentiodynamic polarization tests were conducted to characterize the electrochemical behaviour of the X70 line pipe steel in different soil environments. Results of the study showed that the environmental conditions in many locations in China contributed to SCC in pipelines. SCC was observed on the surface of X70 steel pipe specimens in both marsh and saline environments. Seasonal temperature changes also contributed additional stress on pipelines. The movement of soil bodies in mountainous areas also contributed to stress and coating damage. It was concluded that proper cathodic protection can alleviate concentrations of local solutions under disbanded coatings. Overprotection of SCC will accelerate the growth of cracks and the degradation of coatings. Samples gathered from the solutions found under the disbanded coatings of pipelines will be used to form part of a reference database for predicting SCC in oil and gas pipelines in the future. 2 refs., 4 tabs., 5 figs.

  6. 76 FR 545 - Combined Notice of Filings #1

    Science.gov (United States)

    2011-01-05

    ... Wind Energy, LLC; FPL Energy Wyoming, LLC; FPL Energy New Mexico Wind, LLC; FPL Energy Vansycle LLC... Gas, LLC, Eastern Landfill Gas, LLC, Connectiv Energy Supply, Inc., Bethlehem Renewable Energy LLC...; Potomac Elec. Pwr Co.; Connectiv Energy Supp.; Pepco Energy Svcs.; Bethlehem Renewable Energy; Eastern...

  7. 78 FR 64020 - Manufacturer of Controlled Substances, Notice of Registration, Siegfried USA, LLC

    Science.gov (United States)

    2013-10-25

    ..., Notice of Registration, Siegfried USA, LLC The Notice dated July 23, 2013, and published in the Federal Register on August 1, 2013, 78 FR 46613, page 18338, Siegfried (USA), LLC., 33 Industrial Park Road...), and Poppy Straw Concentrate (9670). On August 6, 2013, Siegfried (USA), LLC., subsequently withdrew...

  8. Model documentation Natural Gas Transmission and Distribution Model of the National Energy Modeling System. Volume 1

    International Nuclear Information System (INIS)

    1996-01-01

    The Natural Gas Transmission and Distribution Model (NGTDM) of the National Energy Modeling System is developed and maintained by the Energy Information Administration (EIA), Office of Integrated Analysis and Forecasting. This report documents the archived version of the NGTDM that was used to produce the natural gas forecasts presented in the Annual Energy Outlook 1996, (DOE/EIA-0383(96)). The purpose of this report is to provide a reference document for model analysts, users, and the public that defines the objectives of the model, describes its basic approach, and provides detail on the methodology employed. Previously this report represented Volume I of a two-volume set. Volume II reported on model performance, detailing convergence criteria and properties, results of sensitivity testing, comparison of model outputs with the literature and/or other model results, and major unresolved issues

  9. Model documentation Natural Gas Transmission and Distribution Model of the National Energy Modeling System. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-26

    The Natural Gas Transmission and Distribution Model (NGTDM) of the National Energy Modeling System is developed and maintained by the Energy Information Administration (EIA), Office of Integrated Analysis and Forecasting. This report documents the archived version of the NGTDM that was used to produce the natural gas forecasts presented in the Annual Energy Outlook 1996, (DOE/EIA-0383(96)). The purpose of this report is to provide a reference document for model analysts, users, and the public that defines the objectives of the model, describes its basic approach, and provides detail on the methodology employed. Previously this report represented Volume I of a two-volume set. Volume II reported on model performance, detailing convergence criteria and properties, results of sensitivity testing, comparison of model outputs with the literature and/or other model results, and major unresolved issues.

  10. Contribution to the study of the transmission of ultrasound at a solid - gas - liquid interface. Application to non-destructive testing of the fourth generation of liquid sodium cooled reactors

    International Nuclear Information System (INIS)

    Paumel, K.

    2008-01-01

    One of the ways envisaged for the ultrasonic inspection of the fourth generation of liquid sodium cooled reactors is to use a transducer immersed in sodium. A good acoustic coupling of the transducer with sodium is needed. However, without special precautions, it is not obtained in all situations. The goal is to study the conditions for the appearance of a very bad acoustic coupling. Under certain conditions, the non wetting of the surface of the transducer by sodium causes trapping gas pockets in the roughness. Moreover, increasing amounts of surface gas fraction induces a sharp drop in the transmission of ultrasound. A first quasi-static analysis based on the crevice model allows to study the dependence of the stability of these gas pockets on the temperature, the hydrostatic pressure, and the level of dissolved gas saturation of the liquid. Modelling the dynamic behaviour of a simple gas pocket geometry and conducting an in-water viewing experience show that the gas surface fraction does not increase as a result of sound pressure transducer. In order to develop a parametric study based on the size and gas surface fraction, several samples are made. An ultrasonic experiment using various frequencies can measure the transmission through these samples. Meanwhile, three different models describing the experimental setup are proposed. The comparison of experimental and analytical results (of the last model) show a similar pattern of the dependence of the transmission on the various parameters. (author) [fr

  11. Combined natural gas and electricity network pricing

    Energy Technology Data Exchange (ETDEWEB)

    Morais, M.S.; Marangon Lima, J.W. [Universidade Federal de Itajuba, Rua Dr. Daniel de Carvalho, no. 296, Passa Quatro, Minas Gerais, CEP 37460-000 (Brazil)

    2007-04-15

    The introduction of competition to electricity generation and commercialization has been the main focus of many restructuring experiences around the world. The open access to the transmission network and a fair regulated tariff have been the keystones for the development of the electricity market. Parallel to the electricity industry, the natural gas business has great interaction with the electricity market in terms of fuel consumption and energy conversion. Given that the transmission and distribution monopolistic activities are very similar to the natural gas transportation through pipelines, economic regulation related to the natural gas network should be coherent with the transmission counterpart. This paper shows the application of the main wheeling charge methods, such as MW/gas-mile, invested related asset cost (IRAC) and Aumman-Shapley allocation, to both transmission and gas network. Stead-state equations are developed to adequate the various pricing methods. Some examples clarify the results, in terms of investments for thermal generation plants and end consumers, when combined pricing methods are used for transmission and gas networks. The paper also shows that the synergies between gas and electricity industry should be adequately considered, otherwise wrong economic signals are sent to the market players. (author)

  12. 78 FR 30333 - Manufacturer of Controlled Substances; Notice of Registration; Siegfried (Usa), Llc.

    Science.gov (United States)

    2013-05-22

    ...; Notice of Registration; Siegfried (Usa), Llc. By Notice dated November 19, 2012, and published in the Federal Register on November 27, 2012, 77 FR 70825, Siegfried (USA), LLC., 33 Industrial Park Road... 21 U.S.C. 823(a) and determined that the registration of Siegfried (USA), LLC., to manufacture the...

  13. 78 FR 64020 - Manufacturer of Controlled Substances; Notice of Registration; Siegfried USA, LLC

    Science.gov (United States)

    2013-10-25

    ...; Notice of Registration; Siegfried USA, LLC By Notice dated May 22, 2013, and published in the Federal Register on May 30, 2013, 78 FR 32458, Siegfried USA, LLC., 33 Industrial Park Road, Pennsville, New Jersey... determined that the registration of Siegfried USA, LLC., to manufacture the listed basic class of controlled...

  14. Transmission pipeline calculations and simulations manual

    CERN Document Server

    Menon, E Shashi

    2014-01-01

    Transmission Pipeline Calculations and Simulations Manual is a valuable time- and money-saving tool to quickly pinpoint the essential formulae, equations, and calculations needed for transmission pipeline routing and construction decisions. The manual's three-part treatment starts with gas and petroleum data tables, followed by self-contained chapters concerning applications. Case studies at the end of each chapter provide practical experience for problem solving. Topics in this book include pressure and temperature profile of natural gas pipelines, how to size pipelines for specified f

  15. 75 FR 70689 - Kaiser Aluminum Fabricated Products, LLC; Kaiser Aluminum-Greenwood Forge Division; Currently...

    Science.gov (United States)

    2010-11-18

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-70,376] Kaiser Aluminum Fabricated Products, LLC; Kaiser Aluminum- Greenwood Forge Division; Currently Known As Contech Forgings, LLC..., applicable to workers of Kaiser Aluminum Fabricated Products, LLC, Kaiser Aluminum-Greenwood Forge Division...

  16. 78 FR 64019 - Manufacturer of Controlled Substances, Notice of Registration, Austin Pharma, LLC.

    Science.gov (United States)

    2013-10-25

    ..., Notice of Registration, Austin Pharma, LLC. By Notice dated May 14, 2013, and published in the Federal Register on May 22, 2013, 78 FR 30332, Austin Pharma, LLC., 811 Paloma Drive, Suite C, Round Rock, Texas... this drug code is authorized for this registration. On August 9, 2013, Austin Pharma, LLC., withdrew...

  17. 77 FR 2286 - Northern Illinois Hydropower, LLC; Notice of Meeting

    Science.gov (United States)

    2012-01-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12717-002] Northern Illinois Hydropower, LLC; Notice of Meeting a. Date and Time of Meeting: Thursday, January 26, 2012 from 11... Meeting: Commission staff will meet with Northern Illinois Hydropower, LLC to discuss potentially moving...

  18. 75 FR 16456 - Inglis Hydropower, LLC; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2010-04-01

    ... Hydropower, LLC; Notice Soliciting Scoping Comments March 26, 2010. Take notice that the following...: Inglis Hydropower, LLC. e. Name of Project: Inglis Hydropower Project. f. Location: The proposed project... Commission staff intends to prepare a single Environmental Assessment (EA) for the Inglis Hydropower Project...

  19. Development of cross border gas transmission projects raise challenging issues. Case studies: The transmed and the Maghreb/Europe pipelines

    International Nuclear Information System (INIS)

    Khene, D.

    1997-01-01

    Development of cross border gas transmission projects raise complex and interdependent issues whose successful resolution require not only technical and management strengths but also a close cooperation between the key players involved in the game. In this paper we shall attempt to explain some of the major issues encountered during the appraisal and construction of long distance gas pipeline schemes. The information used derive essentially from the experience gained during the development of the Trans-mediterranean and the Maghreb/Europe pipelines. Running through the various issues we shall also identify and then discuss a number of factors which contributed to the successful implementation of these two projects. (au)

  20. 75 FR 4547 - High Island Offshore System, L.L.C.; Notice of Application

    Science.gov (United States)

    2010-01-28

    ... Offshore System, L.L.C.; Notice of Application January 21, 2010. Take notice that on January 12, 2010, High Island Offshore System, L.L.C. (HIOS), 1100 Louisiana St., Houston, Texas 77002, filed in Docket No. CP10... directed to Jeff Molinaro, High Island Offshore System, L.L.C., 1100 Louisiana St., Houston, Texas 77002...

  1. 77 FR 20442 - Sunwest Rollover Member LLC; Notice of Application

    Science.gov (United States)

    2012-04-04

    ... limited liability company formed for the purpose of holding equity interests (``Rollover Equity Interests'') in BRE/SW Portfolio LLC (``Blackstone LLC''),\\1\\ a Delaware limited liability company, to resolve the... common interests and class A preferred units, each as defined in the limited liability company agreement...

  2. 75 FR 13319 - NextEra Energy Seabrook, LLC, et al.

    Science.gov (United States)

    2010-03-19

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-443; NRC-2010-0108] NextEra Energy Seabrook, LLC, et al.,* Seabrook Station, Unit No. 1 Environmental Assessment and Finding of No Significant Impact * NextEra Energy Seabrook, LLC is authorized to act as agent for the Hudson Light & Power Department...

  3. Gas industry construction expenditures to grow rapidly

    International Nuclear Information System (INIS)

    Quarles, W.R.

    1991-01-01

    Between 1991 and 1993, the natural gas industry will invest $28.297 billion to install additional facilities for natural gas production and storage, transmission, underground storage, gas distribution and for other general expenditures, estimates the American Gas Association as shown in the 1990 Gas Facts. This is a 38% investment increase from the forecasts in the 1989 Gas Facts. This issue forecasts investments of $13.303 billion for 1991 and $18.396 billion for 1992. This issue does not include investments for 1993. In 1989, (the last figures released) the gas industry invested $7,341 billion for new transmission lines, distribution mains, underground storage, production and storage and general facilities. Included in the 1989 expenditures are: $3.980 billion in distribution facilities; $2.081 billion in gas transmission systems and $159 million in underground storage facilities. Investment in new distribution facilities in 1991 and $4.550 billion in 1993. This is a steady increase for these three years. Investments in natural gas transmission facilities show a steady increase also. In 1991, pipe line operating companies will invest $9.391 billion for new facilities, $9.005 in 1992 and $9.901 billion in 1993

  4. 75 FR 32221 - Alticor, Inc., Including Access Business Group International, LLC, and Amway Corporation...

    Science.gov (United States)

    2010-06-07

    ... Access Business Group International, LLC, and Amway Corporation, Including On-Site Leased Workers from... Business Group International, LLC and Amway Corporation. The notice was published in the Federal Register... issued as follows: All workers of Alticor, Inc., including Access Business Group International, LLC and...

  5. 77 FR 10505 - Notice of Attendance at PJM Interconnection, L.L.C. Meetings

    Science.gov (United States)

    2012-02-22

    ... Interconnection, L.L.C. Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C. (PJM..., PJM Interconnection, L.L.C. Docket Nos. ER06-456, ER06-880, ER06-954, ER06-1271, EL07-57, ER07-424...

  6. 76 FR 35200 - High Island Offshore System, L.L.C.; Notice of Amendment

    Science.gov (United States)

    2011-06-16

    ... Offshore System, L.L.C.; Notice of Amendment Take notice that on June 6, 2011, High Island Offshore System, L.L.C. (HIOS), 1100 Louisiana St., Houston, Texas 77002, filed in Docket No. CP10-43-001, to amend... System, L.L.C., 1100 Louisiana St., Houston, Texas 77002, or (telephone) 713-381-2526, or [email protected

  7. 77 FR 52368 - Manufacturer of Controlled Substances; Notice of Registration; Austin Pharma, LLC.

    Science.gov (United States)

    2012-08-29

    ...; Notice of Registration; Austin Pharma, LLC. By Notice dated May 9, 2012, and published in the Federal Register on May 21, 2012, 77 FR 30027, Austin Pharma LLC., 811 Paloma Drive, Suite C, Round Rock, Texas... factors in 21 U.S.C. 823(a) and determined that the registration of Austin Pharma LLC., to manufacture the...

  8. 75 FR 38799 - ETC Tiger Pipeline, LLC; Notice of Application

    Science.gov (United States)

    2010-07-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-459-000] ETC Tiger Pipeline, LLC; Notice of Application June 25, 2010. Take notice that on June 15, 2010, ETC Tiger Pipeline, LLC (ETC Tiger), 711 Louisiana Street, Suite 900, Houston, Texas 77002, filed an application in Docket...

  9. Monitoring the mass of UF6 gas and uranium deposits in aluminium pipes using X-ray fluorescence and X-ray transmission gauges

    International Nuclear Information System (INIS)

    Packer, T.W.; Smith, S.M.

    1984-12-01

    In order to determine the enrichment of UF 6 gas in centrifuge plant pipework it is necessary to measure the mass of the gas (pressure) and the mass per unit area of any uranium deposited on the pipe. This paper shows that it is possible to determine the pressure of the UF 6 gas in pipes 120 mm in diameter using an energy-dispersive X-ray fluorescence spectrometer. Results are also given of transmission measurements made using a low power X-ray generator operated at two different applied voltages. A method of using the two measurements to determine the mass per unit area of deposited uranium is described. (author)

  10. A Cost-Effective Design and Analysis of Full Bridge LLC Resonant Converter

    OpenAIRE

    Kaibalya Prasad Panda; Sreyasee Rout

    2016-01-01

    LLC (Inductor-inductor-capacitor) resonant converter has lots of advantages over other type of resonant converters which include high efficiency, more reliable and have high power density. This paper presents the design and analysis of a full bridge LLC resonant converter. In addition to the operational principle, the ZVS and ZCS conditions are also explained with the DC characteristics. Simulation of the LLC resonant converter is performed in MATLAB/ Simulink and the practical prototype setu...

  11. Analytical Model for LLC Resonant Converter With Variable Duty-Cycle Control

    DEFF Research Database (Denmark)

    Shen, Yanfeng; Wang, Huai; Blaabjerg, Frede

    2016-01-01

    are identified and discussed. The proposed model enables a better understanding of the operation characteristics and fast parameter design of the LLC converter, which otherwise cannot be achieved by the existing simulation based methods and numerical models. The results obtained from the proposed model......In LLC resonant converters, the variable duty-cycle control is usually combined with a variable frequency control to widen the gain range, improve the light-load efficiency, or suppress the inrush current during start-up. However, a proper analytical model for the variable duty-cycle controlled LLC...... converter is still not available due to the complexity of operation modes and the nonlinearity of steady-state equations. This paper makes the efforts to develop an analytical model for the LLC converter with variable duty-cycle control. All possible operation models and critical operation characteristics...

  12. 77 FR 73635 - Northwest Storage GP, LLC; Notice of Application

    Science.gov (United States)

    2012-12-11

    ...) 1254 to a proposed 346-megawatt (MW) power plant located within the north industrial area of the Port...] Northwest Storage GP, LLC; Notice of Application Take notice that on November 21, 2012, Northwest Storage GP, LLC. (Northwest) filed with the Federal Energy Regulatory Commission an application under section 7 of...

  13. 75 FR 33799 - EasTrans, LLC; Notice of Baseline Filing

    Science.gov (United States)

    2010-06-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-30-000] EasTrans, LLC; Notice of Baseline Filing June 8, 2010. Take notice that on June 4, 2010, EasTrans, LLC submitted a baseline filing of its Statement of Operating Conditions for services provided under section 311 of the...

  14. 76 FR 4103 - ETC Tiger Pipeline, LLC; Notice of Filing

    Science.gov (United States)

    2011-01-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AC11-25-000] ETC Tiger Pipeline, LLC; Notice of Filing January 13, 2011. Take notice that on December 30, 2010, ETC Tiger Pipeline, LLC submitted a request for a waiver of the reporting requirement to file the FERC Form 2 for 2010...

  15. 76 FR 82295 - Central Power & Lime LLC; Notice of Filing

    Science.gov (United States)

    2011-12-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL12-18-000; QF82-207-007] Central Power & Lime LLC; Notice of Filing December 23, 2011. Take notice that on December 22, 2011, Central Power & Lime LLC, pursuant to sections 18 CFR 292.205(c) and 385.207 of the Federal Energy...

  16. 76 FR 45878 - Alticor, Inc., Including Access Business Group International LLC and Amway Corporation, Buena...

    Science.gov (United States)

    2011-08-01

    ...,420B] Alticor, Inc., Including Access Business Group International LLC and Amway Corporation, Buena Park, CA; Alticor, Inc., Including Access Business Group International LLC and Amway Corporation...., Including Access Business Group International LLC and Amway Corporation, Including On-Site Leased Workers...

  17. 75 FR 26794 - Alticor, Inc., Including Access Business Group International LLC and Amway Corporation, Buena...

    Science.gov (United States)

    2010-05-12

    ..., Inc., Including Access Business Group International LLC and Amway Corporation, Buena Park, CA; Alticor, Inc., Including Access Business Group International LLC, and Amway Corporation, Ada, MI; Amended... of Alticor, Inc., including Access Business Group International LLC and Amway Corporation, Buena Park...

  18. 78 FR 55776 - Hainesport Industrial Railroad, LLC-Corporate Family Transaction Exemption

    Science.gov (United States)

    2013-09-11

    ... Industrial Railroad, LLC--Corporate Family Transaction Exemption Hainesport Industrial Railroad, LLC... operates a series of tracks serving several customers located in the Hainesport Industrial Park in... the competitive balance with carriers outside the corporate family. Under 49 U.S.C. 10502(g), the...

  19. 76 FR 2093 - Eni USA Gas Marketing LLC; Application for Blanket Authorization To Export Liquefied Natural Gas

    Science.gov (United States)

    2011-01-12

    ... Authorization To Export Liquefied Natural Gas AGENCY: Office of Fossil Energy, DOE. ACTION: Notice of...), requesting blanket authorization to export liquefied natural gas (LNG) that previously had been imported into... (Bcf) of natural gas. The LNG would be exported from the Cameron LNG Terminal (Cameron Terminal), owned...

  20. Calculating the Optimum Angle of Filament-Wound Pipes in Natural Gas Transmission Pipelines Using Approximation Methods.

    Science.gov (United States)

    Reza Khoshravan Azar, Mohammad; Emami Satellou, Ali Akbar; Shishesaz, Mohammad; Salavati, Bahram

    2013-04-01

    Given the increasing use of composite materials in various industries, oil and gas industry also requires that more attention should be paid to these materials. Furthermore, due to variation in choice of materials, the materials needed for the mechanical strength, resistance in critical situations such as fire, costs and other priorities of the analysis carried out on them and the most optimal for achieving certain goals, are introduced. In this study, we will try to introduce appropriate choice for use in the natural gas transmission composite pipelines. Following a 4-layered filament-wound (FW) composite pipe will consider an offer our analyses under internal pressure. The analyses' results will be calculated for different combinations of angles 15 deg, 30 deg, 45 deg, 55 deg, 60 deg, 75 deg, and 80 deg. Finally, we will compare the calculated values and the optimal angle will be gained by using the Approximation methods. It is explained that this layering is as the symmetrical.

  1. Model documentation: Natural Gas Transmission and Distribution Model of the National Energy Modeling System; Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-02-24

    The Natural Gas Transmission and Distribution Model (NGTDM) is a component of the National Energy Modeling System (NEMS) used to represent the domestic natural gas transmission and distribution system. NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the Energy Information Administration (EIA) and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. This report documents the archived version of NGTDM that was used to produce the natural gas forecasts used in support of the Annual Energy Outlook 1994, DOE/EIA-0383(94). The purpose of this report is to provide a reference document for model analysts, users, and the public that defines the objectives of the model, describes its basic design, provides detail on the methodology employed, and describes the model inputs, outputs, and key assumptions. It is intended to fulfill the legal obligation of the EIA to provide adequate documentation in support of its models (Public Law 94-385, Section 57.b.2). This report represents Volume 1 of a two-volume set. (Volume 2 will report on model performance, detailing convergence criteria and properties, results of sensitivity testing, comparison of model outputs with the literature and/or other model results, and major unresolved issues.) Subsequent chapters of this report provide: (1) an overview of the NGTDM (Chapter 2); (2) a description of the interface between the National Energy Modeling System (NEMS) and the NGTDM (Chapter 3); (3) an overview of the solution methodology of the NGTDM (Chapter 4); (4) the solution methodology for the Annual Flow Module (Chapter 5); (5) the solution methodology for the Distributor Tariff Module (Chapter 6); (6) the solution methodology for the Capacity Expansion Module (Chapter 7); (7) the solution methodology for the Pipeline Tariff Module (Chapter 8); and (8) a description of model assumptions, inputs, and outputs (Chapter 9).

  2. Quantities of natural gas transmitted in January-December 2012. Quantities of natural gas transported in January-December 2012

    International Nuclear Information System (INIS)

    2013-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents the monthly key figures of GRTgaz activity in 2012: Total quantities transmitted by GRTgaz (Inputs to the GRTgaz network/Outputs from the GRTgaz network); Maximum and minimum daily flow (Daily quantities transported, Daily consumption, Daily inputs excluding storage); Quantities exchanged on the wholesale market; Consumption on the GRTgaz Network (gross monthly consumption and Average monthly temperatures)

  3. Tom Ford Construction, LLC Information Sheet

    Science.gov (United States)

    Tom Ford Construction, LLC (the Company) is located in Brentwood, Tennessee. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Nashville, Tennessee.

  4. 78 FR 50405 - Amended Application for Presidential Permit; Northern Pass Transmission LLC

    Science.gov (United States)

    2013-08-19

    ... Pass proposes to construct and operate a primarily overhead high-voltage direct current (HVDC) electric transmission line that would originate at an HVDC converter station to be constructed at the Des Cantons Substation in Qu[eacute]bec, Canada, then would be converted from HVDC to alternating current (AC) in...

  5. 77 FR 54908 - TC Offshore, LLC; Notice Establishing Deadline for Comments

    Science.gov (United States)

    2012-09-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP12-908-000] TC Offshore, LLC; Notice Establishing Deadline for Comments On August 29, 2012, TC Offshore, LLC (TC Offshore... is hereby given that participants in the captioned proceedings may file comments to TC Offshsore's...

  6. 76 FR 73618 - Enterprise Texas Pipeline LLC; Notice of Compliance Filing

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PR11-92-001] Enterprise Texas Pipeline LLC; Notice of Compliance Filing Take notice that on November 22, 2011, Enterprise Texas Pipeline LLC (Enterprise Texas) filed a revised Statement of Operating Conditions to comply with a...

  7. World Gas Conference 1997. Working committee J. World gas prospects, strategies and economics

    International Nuclear Information System (INIS)

    1997-01-01

    This volume of the proceedings contains the report of the International Gas Union's Working Committee J - World gas prospects, strategies and economics - and 7 oral papers dealing with natural gas supply and demand and transmission. (LN)

  8. 76 FR 28226 - Ndahendekire Barbara v. African Shipping; Njoroge Muhia; Alco Logistics, Llc; Brenda Alexander...

    Science.gov (United States)

    2011-05-16

    ... Muhia; Alco Logistics, Llc; Brenda Alexander; and AIR 7 Seas Transportlogistics, Inc.; Notice of Filing...; Njoroge Muhia, ALCO Logistics, LLC; Brenda Alexander; and Air 7 Seas Transport Logistics, Inc...; Respondent ALCO Logistics, LLC, is a freight forwarding and logistics company; Respondent Brenda Alexander is...

  9. 75 FR 6378 - Covanta Pylmouth Renewable Energy Limited Partnership Covanta Energy Marketing LLC Covanta Power...

    Science.gov (United States)

    2010-02-09

    ..., ER10-410-000] Covanta Pylmouth Renewable Energy Limited Partnership Covanta Energy Marketing LLC... Pylmouth Renewable Energy Limited Partnership, Covanta Energy Marketing LLC, and Covanta Power, LLC filed... assistance with any FERC Online service, please e-mail [email protected] , or call (866) 208-3676...

  10. 77 FR 31349 - Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-05-25

    ... Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 12, 2012, Coastal Hydropower, LLC filed an... generation of 31.5 gigawatt-hours. Applicant Contact: Neil Anderson, Coastal Hydropower, LLC, Key Centre, 601...

  11. A Transmission Company at the Cross-Roads

    Energy Technology Data Exchange (ETDEWEB)

    Heinrich, Christian [Thyssengas GmbH, (Germany)

    1998-12-31

    This presentation discusses the role of the gas transmission companies. Gas pipelines are usually tailor-made for a specified gas flow and a specified point of delivery and cannot be used cost-effectively for other purposes. This means that producer and importer are much closer linked than for any other energy and both have a strong common interest in meeting their long-term obligations. The risks connected with the investments in the infrastructure are shared among the partners in the supply chain. In Germany, gas has always had to compete with oil, electricity or coal. Gas has been able to replace oil to a great extent since, being an integrated package of commodity and services, it has offered far more than just gas molecules. The traditional sharing of roles between exploration/production on the one hand and import/distribution/market development on the other hand has proved its worth in the past decades although it has taken different forms in different countries. The liberalization laws of the EU are influencing the current buyer`s market. As a result, the transmission companies are at a crossroads. They must face the question whether they are the most efficient and cost-effective providers of the services required in the value-added chain. In addition to gas delivery, they must also offer a variety of new services in line with the customer`s needs and at a competitive price. The transmission companies will be the right partners for both producers and end consumers

  12. RA Construction KC, LLC Information Sheet

    Science.gov (United States)

    RA Construction KC, LLC (the Company) is located in Gladstone, Missouri. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Kansas City, Missouri.

  13. 78 FR 36543 - Sunshine Act Meeting

    Science.gov (United States)

    2013-06-18

    ... Between Natural Gas and Electricity Markets. ELECTRIC E-1 ER13-93-000 Avista Corporation. ER13-94-000 ER13... Transmission System Operator, Inc. E-6 EL13-52-000 Western Electricity Coordinating Council. E-7 RM13-8-000...-001 Idaho Wind Partners 1, LLC. HYDRO H-1 P-2144-040 City of Seattle, Washington. H-2 P-2114-257...

  14. 77 FR 64422 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Science.gov (United States)

    2012-10-22

    ... Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY... State Implementation Plan (SIP) an adjusted standard for the Greif Packaging, LLC facility located at 5... submitted an Adjusted Standard for the Greif Packaging, LLC facility located at 5 S 220 Frontenac Road in...

  15. 76 FR 78325 - Self-Regulatory Organizations; NASDAQ Stock Market LLC; Notice of Filing and Immediate...

    Science.gov (United States)

    2011-12-16

    ...-Regulatory Organizations; NASDAQ Stock Market LLC; Notice of Filing and Immediate Effectiveness of a Proposed... November 30, 2011. The NASDAQ Stock Market LLC (``NASDAQ'' or ``Exchange'') filed with the Securities and... Change The NASDAQ Stock Market LLC proposes to amend Rule 7056 entitled ``NASDAQ Options Fee Disputes...

  16. 75 FR 59707 - Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-09-28

    ... Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... on July 16, 2010, Coastal Hydropower, LLC filed an application for a preliminary permit, pursuant to... Hydropower, LLC, Key Centre, 601 108th Avenue, NE., Suite 1900, Bellevue, WA 98004; phone: (425) 943-7690...

  17. 75 FR 62516 - Northern Illinois Hydropower, LLC; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-10-12

    ... Illinois Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...: Northern Illinois Hydropower, LLC. e. Name of Project: Dresden Island Project. f. Location: U.S. Army Corps... Zdunich, Northern Illinois Hydropower, LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 320-1610. i. FERC...

  18. 75 FR 62518 - Northern Illinois Hydropower, LLC; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-10-12

    ... Illinois Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...: Northern Illinois Hydropower, LLC. e. Name of Project: Brandon Road Hydroelectric Project. f. Location: U.S... Hydropower, LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 320-1610. i. FERC Contact: Janet Hutzel, (202...

  19. 78 FR 6316 - Enterprise Texas Pipeline LLC; Notice of Compliance Filing

    Science.gov (United States)

    2013-01-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR13-23-000] Enterprise Texas Pipeline LLC; Notice of Compliance Filing Take notice that on January 17, 2013, Enterprise Texas Pipeline LLC filed a revised Statement of Operating Conditions to comply with a Commission order issued in...

  20. 75 FR 70732 - Enterprise Texas Pipeline LLC; Notice of Baseline Filing

    Science.gov (United States)

    2010-11-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-92-001] Enterprise Texas Pipeline LLC; Notice of Baseline Filing November 10, 2010. Take notice that on November 9, 2010, Enterprise Texas Pipeline LLC submitted a revised baseline filing of its Statement of Operating Conditions...

  1. 75 FR 35020 - Wilkesboro Hydroelectric Company, LLC; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2010-06-21

    ... Hydroelectric Company, LLC; Notice Soliciting Scoping Comments June 15, 2010 Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Wilkesboro Hydroelectric Company, LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f...

  2. 75 FR 24937 - Northern Illinois Hydropower, LLC; Notice of Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-05-06

    ... Illinois Hydropower, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and... No.: 12717-002. c. Date filed: May 27, 2009. d. Applicant: Northern Illinois Hydropower, LLC. e. Name... Hydropower, LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 320-1610. i. FERC Contact: Dr. Nicholas Palso...

  3. Transmission properties of hollow-core photonic bandgap fibers

    DEFF Research Database (Denmark)

    Falk, Charlotte Ijeoma; Hald, Jan; Petersen, Jan C.

    2010-01-01

    Variations in optical transmission of four types of hollow-core photonic bandgap fibers are measured as a function of laser frequency. These variations influence the potential accuracy of gas sensors based on molecular spectroscopy in hollow-core fibers.......Variations in optical transmission of four types of hollow-core photonic bandgap fibers are measured as a function of laser frequency. These variations influence the potential accuracy of gas sensors based on molecular spectroscopy in hollow-core fibers....

  4. 78 FR 5854 - Application of Scott Air, LLC for Certificate Authority

    Science.gov (United States)

    2013-01-28

    ... DEPARTMENT OF TRANSPORTATION Office of the Secretary Application of Scott Air, LLC for Certificate Authority AGENCY: Department of Transportation. ACTION: Notice of order to show cause (Order 2013-1-12... to show cause why it should not issue an order finding Scott Air, LLC fit, willing, and able, and...

  5. 76 FR 13610 - Enterprise Texas Pipeline LLC; Notice of Compliance Filing

    Science.gov (United States)

    2011-03-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PR10-14-002; PR11-92-000] Enterprise Texas Pipeline LLC; Notice of Compliance Filing Take notice that on March 1, 2011, Enterprise Texas Pipeline LLC (Enterprise Texas) filed a revised Statement of Rates to its Statement of Operating...

  6. 75 FR 68780 - Cedar Creek Wind Energy, LLC; Notice of Filing

    Science.gov (United States)

    2010-11-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RC11-1-000] Cedar Creek Wind Energy, LLC; Notice of Filing November 2, 2010. Take notice that on October 27, 2010, Cedar Creek Wind Energy, LLC (Cedar Creek) filed an appeal with the Federal Energy Regulatory Commission (Commission) of...

  7. 75 FR 38802 - DCP Raptor Pipeline, LLC; Notice of Baseline Filing

    Science.gov (United States)

    2010-07-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-42-000] DCP Raptor Pipeline, LLC; Notice of Baseline Filing June 28, 2010. Take notice that on June 22, 2010, DCP Raptor Pipeline, LLC submitted a baseline filing of its Statement of Operating Conditions for services provided...

  8. State-Trajectory Analysis and Control of LLC Resonant Converters

    OpenAIRE

    Feng, Weiyi

    2013-01-01

    With the fast development of communication systems, computers and consumer electronics, the power supplies for telecoms, servers, desktops, laptops, flat-panel TVs, LED lighting, etc. are required for more power delivery with smaller spaces. The LLC resonant converter has been widely adopted for these applications due to the advantages in high efficiency, high power density and holdup time operation capability.However, unlike PWM converters, the control of the LLC resonant converter is much m...

  9. 77 FR 54787 - Airworthiness Directives; M7 Aerospace LLC Airplanes

    Science.gov (United States)

    2012-09-06

    ... Airworthiness Directives; M7 Aerospace LLC Airplanes AGENCY: Federal Aviation Administration (FAA), DOT. ACTION... Aerospace LLC Models SA226-AT, SA226-T, SA226-T(B), SA226-TC, SA227-AC (C-26A), SA227-BC (C-26A), SA227-CC..., contact M7 Aerospace LP, 10823 NE Entrance Road, San Antonio, Texas 78216; phone: (210) 824- 9421; fax...

  10. 75 FR 57013 - Notice of Effectiveness of Exempt Wholesale Generator Status; Taloga Wind, LLC, Stephentown...

    Science.gov (United States)

    2010-09-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EG10-40-000, EG10-41-000, et al.] Notice of Effectiveness of Exempt Wholesale Generator Status; Taloga Wind, LLC, Stephentown...-000 Synergics Roth Rock Wind Energy, LLC EG10-49-000 Synergics Roth Rock North Wind Energy, LLC EG10...

  11. Natural gas consumption within GRTgaz@s balancing zones - Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents some key figures about GRTgaz activity in 2009: Gross and climate-adjusted consumption on GRTgaz's territory, Quantities of natural gas transported by GRTgaz in 2008 and 2009

  12. 77 FR 51837 - Self-Regulatory Organizations; NYSE MKT LLC; Notice of Filing and Immediate Effectiveness of...

    Science.gov (United States)

    2012-08-27

    ... Amending the NYSE Amex Options LLC Limited Liability Company Agreement To Eliminate Certain Restrictions... Options LLC (``NYSE Amex Options'') Limited Liability Company Agreement (``LLC Agreement'') to eliminate... securities exchange or facility thereof (including, but not limited to, internalization of orders for...

  13. 78 FR 57629 - Eagle Valley Clean Energy, LLC; Notice of Filing

    Science.gov (United States)

    2013-09-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL13-87-000; QF13-658-000] Eagle Valley Clean Energy, LLC; Notice of Filing Take notice that on September 9, 2013, Eagle Valley Clean Energy, LLC filed Form 556 and a petition for certification as a qualifying small power production...

  14. 77 FR 77073 - York Haven Power Company, LLC; Notice of Meeting

    Science.gov (United States)

    2012-12-31

    ... Company, LLC; Notice of Meeting On Wednesday, January 9, 2013, Commission staff will meet with York Haven Power Company, LLC (applicant) in Washington, DC. The purpose of the meeting is to discuss the required... begin at 10 a.m. at the Federal Energy Regulatory Commission headquarters building located at 888 First...

  15. Ten-year development plan for the GRTgaz transmission network 2015-2024 period

    International Nuclear Information System (INIS)

    2015-11-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. In accordance with the French Energy Code, GRTgaz publishes a 10-year development plan for its gas distribution network in France every year. This document is produced in line with European and French energy policies. It identifies the transport infrastructure that will need to be built over the next three years, and presents the main infrastructure that is likely to be developed within the next ten years. It incorporates the supply security obligations that TSOs are required to fulfil. It takes account of interested parties' needs and projects at the national, supranational and European levels. It is based on existing gas supply and demand and reasonable medium-term development forecasts for gas infrastructure, consumption and international trade

  16. 10-year development statement on GRTgaz's transmission system 2010-2019

    International Nuclear Information System (INIS)

    2010-10-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. In accordance with the French Energy Code, GRTgaz publishes a 10-year development plan for its gas distribution network in France every year. This document is produced in line with European and French energy policies. It identifies the transport infrastructure that will need to be built over the next three years, and presents the main infrastructure that is likely to be developed within the next ten years. It incorporates the supply security obligations that TSOs are required to fulfil. It takes account of interested parties' needs and projects at the national, supranational and European levels. It is based on existing gas supply and demand and reasonable medium-term development forecasts for gas infrastructure, consumption and international trade

  17. Ten-year development plan for the GRTgaz transmission network 2016-2025 period

    International Nuclear Information System (INIS)

    2016-11-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. In accordance with the French Energy Code, GRTgaz publishes a 10-year development plan for its gas distribution network in France every year. This document is produced in line with European and French energy policies. It identifies the transport infrastructure that will need to be built over the next three years, and presents the main infrastructure that is likely to be developed within the next ten years. It incorporates the supply security obligations that TSOs are required to fulfil. It takes account of interested parties' needs and projects at the national, supranational and European levels. It is based on existing gas supply and demand and reasonable medium-term development forecasts for gas infrastructure, consumption and international trade

  18. Ten-Year Development Plan for the GRTgaz Transmission Network 2011-2020 Period

    International Nuclear Information System (INIS)

    2011-10-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. In accordance with the French Energy Code, GRTgaz publishes a 10-year development plan for its gas distribution network in France every year. This document is produced in line with European and French energy policies. It identifies the transport infrastructure that will need to be built over the next three years, and presents the main infrastructure that is likely to be developed within the next ten years. It incorporates the supply security obligations that TSOs are required to fulfil. It takes account of interested parties' needs and projects at the national, supranational and European levels. It is based on existing gas supply and demand and reasonable medium-term development forecasts for gas infrastructure, consumption and international trade

  19. Transmission issues in Alberta

    International Nuclear Information System (INIS)

    Levson, D.

    2002-01-01

    This paper outlined the major issues and concerns facing users of the transmission system in Alberta. They include congestion management issues that make investors uncertain about power generation. It is necessary to know the difference between which transmission price signals will be faced by low cost cogeneration at Fort McMurray and Cold Lake coal-fired generation near Edmonton compared to combined cycle gas generation near Calgary. Import and export policy tariffs are another concern. Most new generation opportunities in Alberta require access to export markets, but transmission facilities for export need policy support and appropriate tariffs. It was noted that the past actions of Alberta's Transmission Administrator and balancing pool may be distorting market signals for ancillary service markets, and that loss studies and calculations need upgrading

  20. 78 FR 9687 - Prineville Energy Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-02-11

    ... Energy Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 31, 2012, Prineville Energy Storage, LLC, filed... Contact: Mr. Matthew Shapiro, Chief Executive Officer, Prineville Energy Storage, LLC, 1210 W. Franklin...

  1. 75 FR 11530 - Crystal Lake Wind III, LLC, et al.; Notice of Effectiveness of Exempt Wholesale Generator Status

    Science.gov (United States)

    2010-03-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Crystal Lake Wind III, LLC, et al.; Notice of Effectiveness of Exempt Wholesale Generator Status March 4, 2010. Docket Nos. Crystal Lake Wind III, LLC EG10-6-000 GardenGarden Wind, LLC EG10-7-000 Star Point Wind Project LLC EG10-8-000...

  2. 78 FR 3042 - J.P. Morgan Securities LLC, et al.; Notice of Application and Temporary Order

    Science.gov (United States)

    2013-01-15

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. IC-30347; 812-14094] J.P. Morgan Securities LLC... entered against J.P. Morgan Securities LLC (``JPMS''), EMC Mortgage, LLC (``EMC''), Bear Stearns Asset... Inc. (``SACO'') and J.P. Morgan Acceptance Corporation I (``JPMAC'') (together, the ``Defendants'') on...

  3. 77 FR 2286 - Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North...

    Science.gov (United States)

    2012-01-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-44-000] Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, Horizon Wind Energy LLC v. Bonneville Power Administration; Notice of Designation of Certain Commission Personnel as...

  4. software for natural gas pipeline design and simulation

    African Journals Online (AJOL)

    Global Journal

    2017-01-17

    Jan 17, 2017 ... investment and operating cost required for natural gas pipeline transmission ... In the early development of the natural gas transmission industry, pressures were low and ..... The software has an error control capability in.

  5. Consumption of natural gas on GRTgaz's territory - Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents some key figures about GRTgaz activity in 2007: Gross consumption on GRTgaz's transmission system and associated, Change in gross and corrected consumptions on the GRTgaz network over the period 2006-2007, Quantities of natural gas transported each month by GRTgaz in 2007

  6. 77 FR 10794 - Self-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Filing and Immediate...

    Science.gov (United States)

    2012-02-23

    ...-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Filing and Immediate Effectiveness of... February 13, 2012, The NASDAQ Stock Market LLC (``NASDAQ'' or ``Exchange'') filed with the Securities and... Change The NASDAQ Stock Market LLC proposes to modify Chapter XV, Section 2, governing pricing for NASDAQ...

  7. 76 FR 71088 - Self-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Filing and Immediate...

    Science.gov (United States)

    2011-11-16

    ...-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Filing and Immediate Effectiveness of... November 1, 2011, The NASDAQ Stock Market LLC (``NASDAQ'' or ``Exchange'') filed with the Securities and... Change The NASDAQ Stock Market LLC proposes to create a new Rule 7056 entitled ``NASDAQ Options Fee...

  8. 76 FR 87 - Grant of Authority for Subzone Status; Skechers USA, LLC (Distribution of Footwear); Moreno...

    Science.gov (United States)

    2011-01-03

    ... Status; Skechers USA, LLC (Distribution of Footwear); Moreno Valley, California Pursuant to its authority... distribution facility of Skechers USA, LLC, located in Moreno Valley, California, (FTZ Docket 5- 2008, filed 2... activity related to footwear warehousing and distribution at the facility of Skechers USA, LLC, located in...

  9. Analysis and dashboards on GRTgaz transmission activity - January-December 2014

    International Nuclear Information System (INIS)

    2015-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents the monthly key figures of GRTgaz activity in 2014: Shipper markets, Consumer markets; Transported quantities (GRTgaz network inputs and outputs, Monthly allocated quantities at PIR and PITTM); Consumptions (Gross monthly consumptions and average temperature, Gross consumptions and daily temperatures, Gross and climate-corrected consumptions for the public distributions, Industrial customers: consumptions by sectors of activity); GRTgaz customers (Key figures); Up-stream capacities (Capacities reserved on the Network Interface Points (PIR) and N/S and S/N links, Daily delivery service, Secondary capacities' market) Down-stream capacities (Industrial customers, Public distributions); Wholesale markets PEG (Volumes exchanged and number of exchanges at PEGs, Average price P1 by zones)

  10. Analysis and dashboards on GRTgaz transmission activity - January-December 2015

    International Nuclear Information System (INIS)

    2016-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents the monthly key figures of GRTgaz activity in 2015: Shipper markets, Consumer markets; Transported quantities (GRTgaz network inputs and outputs, Monthly allocated quantities at PIR and PITTM); Consumptions (Gross monthly consumptions and average temperature, Gross consumptions and daily temperatures, Gross and climate-corrected consumptions for the public distributions, Industrial customers: consumptions by sectors of activity); GRTgaz customers (Key figures); Up-stream capacities (Capacities reserved on the Network Interface Points (PIR) and N/S and S/N links, Daily delivery service, Secondary capacities' market) Down-stream capacities (Industrial customers, Public distributions); Wholesale markets PEG (Volumes exchanged and number of exchanges at PEGs, Average price P1 by zones)

  11. Analysis and dashboards on GRTgaz transmission activity - January-December 2013

    International Nuclear Information System (INIS)

    2014-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents the monthly key figures of GRTgaz activity in 2013: Shipper markets, Consumer markets; Transported quantities (GRTgaz network inputs and outputs, Monthly allocated quantities at PIR and PITTM); Consumptions (Gross monthly consumptions and average temperature, Gross consumptions and daily temperatures, Gross and climate-corrected consumptions for the public distributions, Industrial customers: consumptions by sectors of activity); GRTgaz customers (Key figures); Up-stream capacities (Capacities reserved on the Network Interface Points (PIR) and N/S and S/N links, Daily delivery service, Secondary capacities' market) Down-stream capacities (Industrial customers, Public distributions); Wholesale markets PEG (Volumes exchanged and number of exchanges at PEGs, Average price P1 by zones)

  12. 75 FR 75994 - Application To Export Electric Energy; NRG Power Marketing LLC

    Science.gov (United States)

    2010-12-07

    ... Marketing LLC AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: NRG Power Marketing LLC (NRGPML) has applied to renew its authority to transmit electric... to Canada would be surplus energy purchased from electric utilities, Federal power marketing agencies...

  13. 77 FR 34093 - License Renewal for Calvert Cliffs Nuclear Power Plant, LLC's

    Science.gov (United States)

    2012-06-08

    ... Nuclear Power Plant, LLC's AGENCY: Nuclear Regulatory Commission. ACTION: Environmental assessment and... Spent Fuel Storage Installation (ISFSI) at the Calvert Cliffs Nuclear Power Plant site near Lusby... Cliffs Nuclear Power Plant, LLC (CCNPP) submitted an application to the NRC to renew NRC License SNM-2505...

  14. 78 FR 64021 - Manufacturer of Controlled Substances; Notice of Registration; Chemtos, LLC

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances; Notice of Registration; Chemtos, LLC By Notice dated June 18, 2013, and published in the Federal Register on July 1, 2013, 78 FR 39340, Chemtos, LLC., 14101 W. Highway 290, Building 2000B, Austin, Texas...

  15. 77 FR 75671 - Manufacturer of Controlled Substances; Notice of Registration; Chemtos, LLC

    Science.gov (United States)

    2012-12-21

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances; Notice of Registration; Chemtos, LLC By Notice dated July 30, 2012, and published in the Federal Register on August 7, 2012, 77 FR 47116, Chemtos, LLC, 14101 W. Highway 290, Building 2000B, Austin, Texas...

  16. A Dual-Bridge LLC Resonant Converter with Fixed-Frequency PWM Control for Wide Input Applications

    DEFF Research Database (Denmark)

    Xiaofeng, Sun; Li, Xiaohua; Shen, Yanfeng

    2017-01-01

    This paper proposes a dual-bridge (DB) LLC resonant converter for wide input applications. The topology is an integration of a half-bridge (HB) LLC circuit and a full-bridge (FB) LLC circuit. The fixed-frequency PWM control is employed and a range of twice the minimum input voltage can be covered....... Compared with the traditional pulse frequency modulation (PFM) controlled HB/FB LLC resonant converter, the voltage gain range is independent of the quality factor and the magnetizing inductor has little influence on the voltage gain, which can simplify the parameter selection process and benefit...

  17. Gas System 2013 at a glance

    International Nuclear Information System (INIS)

    2014-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents some key figures about GRTgaz activity in 2013: Total Consumption 2013 vs 2012: +1.4% gross consumption, -2% climate adjusted. Public Distribution Consumption 2013 vs 2012: +3.6% gross consumption, -1.9% climate adjusted. Industrial Customers Consumption 2013 vs 2012: -2.4% gross consumption. Power Generation: -50% since 2011. Industrial Customers 2012 vs 2013 (excluding power generation): +2%. Transported Quantities by GRTgaz 2013 vs 2012: Stability (-0.1%). LNG imports are down (-19%) compensated by pipe imports (+5%). Increasing outlet to the South-West, Congestion on North-South Link. Price spread between North and South. In 2013, gas gross consumption rose by 1.4 % on GRTgaz network, mainly because of colder climatic conditions, especially during the first half of the year, compared to 2012. Consumption of industrial customers connected to GRTgaz increased by 2 % (excluding power generation), mainly driven by sectors like Refineries, Chemistry, Glass and Materials. In 2013, GRTgaz transmission network ran under unusual gas flow conditions, especially with a continuing decrease of LNG imports (-19 %) and a low level in underground storages (-8 %)

  18. Outlook natural and renewable gas. 2017 gas adequacy report

    International Nuclear Information System (INIS)

    2017-01-01

    Pursuant to Article L.141-10 of the French Energy Code, the managers of the gas distribution and transmission networks published jointly, and for the first time in 2016, a multi-year provisional assessment of gas demand and production in France. This document is an update of that first edition. It was developed in a collaborative process among managers of the distribution and transmission networks, which coordinated their analyses while taking into consideration recent changes in the energy sector. As the 2016 provisional assessment, this document presents three scenarios: a base reference scenario in line with the objectives of the multi-year energy program, and two framing scenarios

  19. 10-year development statement on GRTgaz's transmission system 2009-2018

    International Nuclear Information System (INIS)

    2009-10-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. The fourth Development Statement, covering the development of GRTgaz's transmission system over the period 2009-2018, reflects the sustained demand for new transmission capacity. If the connection projects (LNG terminals, combined-cycle gas turbine power stations, etc.) are confirmed, GRTgaz will pursue the expansion of its transmission infrastructures (1,600 km of additional pipelines, upgrading of the compressor fleet) and, in the long run, increase its entry and exit capacity by more than 65%. These investments will contribute to the opening up of the natural gas market, encouraged by the European Commission and already reinforced by the undertakings made to facilitate access to the French natural gas market. By providing tailored solutions and commercial tools, GRTgaz is making natural gas trading more fluid and enabling suppliers to improve their supplies for the benefit of consumers. Over the first six months of 2009, the number of wholesale market transactions in GRTgaz's North zone grew by more than 40% and the volumes traded by 70%, compared with the levels recorded over the same period in 2008. Since 2008, GRTgaz has seen a rise in demand for additional capacity on its transmission system, despite the slowdown in economic activity. The likelihood of projects being implemented in GRTgaz's North zone rose in 2009. A consultation of market players at the end of 2008 revealed very significant need for the development of

  20. 77 FR 14058 - Santa Teresa Southern Railroad, LLC-Operation Exemption-Rail Line of Verde Logistics Railroad...

    Science.gov (United States)

    2012-03-08

    ... Southern Railroad, LLC--Operation Exemption--Rail Line of Verde Logistics Railroad, LLC at Santa Teresa... notice of exemption under 49 CFR 1150.31 to operate approximately 12,000 feet of rail line owned by Verde Logistics Railroad, LLC (Verde). The rail line extends between a point of connection with Union Pacific...

  1. 76 FR 12949 - Stingray Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2011-03-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-97-000] Stingray Pipeline Company, L.L.C.; Notice of Application On February 22, 2011, Stingray Pipeline Company, L.L.C...--Regulatory Affairs, Stingray Pipeline Company, L.L.C., 1100 Louisiana, Suite 3300, Houston, Texas 77002, by...

  2. 76 FR 21743 - Indigo Logistics, LLC, Liliya Ivanenko, and Leonid Ivanenko-Possible Violations of Section 19 of...

    Science.gov (United States)

    2011-04-18

    ... FEDERAL MARITIME COMMISSION [Docket No. 11-06] Indigo Logistics, LLC, Liliya Ivanenko, and Leonid... Order of Investigation and Hearing entitled Indigo Logistics, LLC; Liliya Ivanenko; and Leonid Ivanenko... instituted to determine: (1) Whether Indigo Logistics, LLC, Liliya Ivanenko, and Leonid Ivanenko violated...

  3. Operation reliability analysis of independent power plants of gas-transmission system distant production facilities

    Science.gov (United States)

    Piskunov, Maksim V.; Voytkov, Ivan S.; Vysokomornaya, Olga V.; Vysokomorny, Vladimir S.

    2015-01-01

    The new approach was developed to analyze the failure causes in operation of linear facilities independent power supply sources (mini-CHP-plants) of gas-transmission system in Eastern part of Russia. Triggering conditions of ceiling operation substance temperature at condenser output were determined with mathematical simulation use of unsteady heat and mass transfer processes in condenser of mini-CHP-plants. Under these conditions the failure probability in operation of independent power supply sources is increased. Influence of environmental factors (in particular, ambient temperature) as well as output electric capability values of power plant on mini-CHP-plant operation reliability was analyzed. Values of mean time to failure and power plant failure density during operation in different regions of Eastern Siberia and Far East of Russia were received with use of numerical simulation results of heat and mass transfer processes at operation substance condensation.

  4. THE TRANSIT TRANSMISSION SPECTRUM OF A COLD GAS GIANT PLANET

    Energy Technology Data Exchange (ETDEWEB)

    Dalba, Paul A.; Muirhead, Philip S.; Veyette, Mark J. [Department of Astronomy, Boston University, 725 Commonwealth Avenue, Boston, MA 02215 (United States); Fortney, Jonathan J. [Department of Astronomy and Astrophysics, University of California, Santa Cruz, CA 95064 (United States); Hedman, Matthew M. [Department of Physics, University of Idaho, Moscow, ID 83843 (United States); Nicholson, Philip D., E-mail: pdalba@bu.edu [Department of Astronomy, Cornell University, Ithaca, NY 14853 (United States)

    2015-12-01

    We use solar occultations observed by the Visual and Infrared Mapping Spectrometer on board the Cassini Spacecraft to extract the 1–5 μm transmission spectrum of Saturn, as if it were a transiting exoplanet. We detect absorption from methane, ethane, acetylene, aliphatic hydrocarbons, and possibly carbon monoxide, with peak-to-peak features of up to 90 parts-per-million despite the presence of ammonia clouds. We also find that atmospheric refraction, as opposed to clouds or haze, determines the minimum altitude that could be probed during mid-transit. Self-consistent exoplanet atmosphere models show good agreement with Saturn’s transmission spectrum but fail to reproduce a large absorption feature near 3.4 μm, likely caused by gaseous ethane and a C–H stretching mode of an unknown aliphatic hydrocarbon. This large feature is located in one of the Spitzer Space Telescope bandpasses and could alter interpretations of transmission spectra if not properly modeled. The large signal in Saturn’s transmission spectrum suggests that transmission spectroscopy of cold, long-period gaseous exoplanets should be possible with current and future observatories. Motivated by these results, we briefly consider the feasibility of  using a survey to search for and characterize cold exoplanets that are analogous to Jupiter and Saturn utilizing a target-of-opportunity approach.

  5. 78 FR 79433 - Mahoning Hydropower, LLC, Ohio, Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2013-12-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13953-002] Mahoning Hydropower, LLC, Ohio, Notice of Availability of Environmental Assessment In accordance with the National... Hydropower, LLC's application for a license to construct, operate, and maintain the Lake Milton Hydroelectric...

  6. 76 FR 58806 - Notice of Petition for Declaratory Order; Southern Cross Transmission LLC

    Science.gov (United States)

    2011-09-22

    ... (Project) to anchor customers through long-term firm negotiated rate transmission service agreements with whatever capacity that is not committed to anchor customers be made available through an open season... with any FERC Online service, please e-mail [email protected] , or call (866) 208-3676 (toll...

  7. 77 FR 55817 - Delek Crude Logistics, LLC; Notice of Petition for Waiver

    Science.gov (United States)

    2012-09-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR12-19-000] Delek Crude Logistics, LLC; Notice of Petition for Waiver Take notice that on June 11, 2012, Delek Crude Logistics, LLC... East Texas Crude Logistics crude oil pipeline system. Any person desiring to intervene or to protest in...

  8. 76 FR 79675 - DCP Raptor Pipeline, LLC; Notice of Extension of Time

    Science.gov (United States)

    2011-12-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR09-32-003] DCP Raptor Pipeline, LLC; Notice of Extension of Time On November 30, 2011, DCP Raptor Pipeline, LLC (Raptor) filed a...) of the Commission's regulations.\\1\\ In support of this request, Raptor states that in Order No. 735...

  9. 78 FR 15718 - Iberdrola Renewables, Inc. PacifiCorp NextEra Energy Resources, LLC Invenergy Wind North America...

    Science.gov (United States)

    2013-03-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-44-006] Iberdrola Renewables, Inc. PacifiCorp NextEra Energy Resources, LLC Invenergy Wind North America LLC Horizon Wind Energy LLC v. Bonneville Power Administration; Notice of Filing Take notice that on March 1, 2013...

  10. 75 FR 33299 - Guardian Pipeline, L.L.C.; Notice of Revised Filing

    Science.gov (United States)

    2010-06-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP10-690-002] Guardian Pipeline, L.L.C.; Notice of Revised Filing June 4, 2010. Take notice that on May 14, 2010, Guardian Pipeline, L.L.C. submitted a revised filing to its filing made on May 14, 2010, in the above referenced...

  11. Analysis and dashboards on GRTgaz transmission activity - January-February 2016

    International Nuclear Information System (INIS)

    2017-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents the monthly key figures of GRTgaz activity in 2016: Shipper markets, Consumer markets; Transported quantities (GRTgaz network inputs and outputs, Monthly allocated quantities at PIR and PITTM); Consumptions (Gross monthly consumptions and average temperature, Gross consumptions and daily temperatures, Gross and climate-corrected consumptions for the public distributions, Industrial customers: consumptions by sectors of activity); GRTgaz customers (Key figures); Up-stream capacities (Capacities reserved on the Network Interface Points (PIR) and N/S and S/N links, Daily delivery service, Secondary capacities' market) Down-stream capacities (Industrial customers, Public distributions); Wholesale markets PEG (Volumes exchanged and number of exchanges at PEGs, Average price P1 by zones). Data in French cover the January-December period, while data in English cover the January-February 2016 period only

  12. Analysis and dashboards on GRTgaz transmission activity - January-February 2017

    International Nuclear Information System (INIS)

    2018-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents the monthly key figures of GRTgaz activity in 2017: Shipper markets, Consumer markets; Transported quantities (GRTgaz network inputs and outputs, Monthly allocated quantities at PIR and PITTM); Consumptions (Gross monthly consumptions and average temperature, Gross consumptions and daily temperatures, Gross and climate-corrected consumptions for the public distributions, Industrial customers: consumptions by sectors of activity); GRTgaz customers (Key figures); Up-stream capacities (Capacities reserved on the Network Interface Points (PIR) and N/S and S/N links, Daily delivery service, Secondary capacities' market) Down-stream capacities (Industrial customers, Public distributions); Wholesale markets PEG (Volumes exchanged and number of exchanges at PEGs, Average price P1 by zones). Data in French cover the January-September period, while data in English cover the January-February 2017 period only

  13. Design of the ITER Electron Cyclotron Heating and Current Drive Waveguide Transmission Line

    Science.gov (United States)

    Bigelow, T. S.; Rasmussen, D. A.; Shapiro, M. A.; Sirigiri, J. R.; Temkin, R. J.; Grunloh, H.; Koliner, J.

    2007-11-01

    The ITER ECH transmission line system is designed to deliver the power, from twenty-four 1 MW 170 GHz gyrotrons and three 1 MW 127.5 GHz gyrotrons, to the equatorial and upper launchers. The performance requirements, initial design of components and layout between the gyrotrons and the launchers is underway. Similar 63.5 mm ID corrugated waveguide systems have been built and installed on several fusion experiments; however, none have operated at the high frequency and long-pulse required for ITER. Prototype components are being tested at low power to estimate ohmic and mode conversion losses. In order to develop and qualify the ITER components prior to procurement of the full set of 24 transmission lines, a 170 GHz high power test of a complete prototype transmission line is planned. Testing of the transmission line at 1-2 MW can be performed with a modest power (˜0.5 MW) tube with a low loss (10-20%) resonant ring configuration. A 140 GHz long pulse, 400 kW gyrotron will be used in the initial tests and a 170 GHz gyrotron will be used when it becomes available. Oak Ridge National Laboratory, managed by UT-Battelle, LLC, for the U.S. Dept. of Energy under contract DE-AC05-00OR22725.

  14. 77 FR 6552 - Mahoning Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-02-08

    ... Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and...: December 7, 2011. d. Submitted By: Mahoning Hydropower, LLC. e. Name of Project: Berlin Lake Hydroelectric... Hydropower, LLC, 11365 Normandy Lane, Chagrin Falls, OH 44023; (440) 804-6627; [email protected] i. FERC...

  15. 78 FR 77118 - KC Small Hydro, LLC; Notice of Amended Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-12-20

    ..., Motions To Intervene, and Competing Applications On May 28, 2013, KC Scoby Hydro, LLC, filed an... 28, 2013, application and sent an acceptance letter to KC Scoby Hydro, LLC. Subsequently, On October 28, 2013, KC Scoby Hydro, LLC, amended its preliminary permit application to change its name to KC...

  16. Analysis and Modeling of Integrated Magnetics for LLC resonant Converters

    DEFF Research Database (Denmark)

    Li, Mingxiao; Ouyang, Ziwei; Zhao, Bin

    2017-01-01

    Shunt-inserted transformers are widely used toobtain high leakage inductance. This paper investigates thismethod in depth to make it applicable to integrate resonantinductor for the LLC resonant converters. The analysis andmodel of magnetizing inductance and leakage inductance forshunt...... transformers can provide a significantdifference. The way to obtain the desirable magnetizing andleakage inductance value for LLC resonant converters issimplified by the creation of air gaps together with a magneticshunt. The calculation and relation are validated by finiteelement analysis (FEA) simulations...

  17. 78 FR 4124 - Approval of Subzone Status, Coamo Property & Investments, LLC, Coamo, PR

    Science.gov (United States)

    2013-01-18

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [S-107-2012] Approval of Subzone Status, Coamo Property & Investments, LLC, Coamo, PR On October 9, 2012, the Executive Secretary of the Foreign-Trade... the proposed operator, Coamo Property & Investments, LLC, in Coamo, Puerto Rico. The application was...

  18. 77 FR 70432 - Enterprise Liquids Pipeline LLC; Notice of Petition for Declaratory Order

    Science.gov (United States)

    2012-11-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR13-7-000] Enterprise Liquids Pipeline LLC; Notice of Petition for Declaratory Order Take notice that on November 14, 2012...), Enterprise Liquids Pipeline LLC, filed a petition seeking a declaratory order approving the rate structures...

  19. 78 FR 49546 - Importer of Controlled Substances; Notice of Application; Siegfried USA, LLC

    Science.gov (United States)

    2013-08-14

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration Importer of Controlled Substances; Notice of Application; Siegfried USA, LLC This is notice that on June 10, 2013, Siegfried USA, LLC., 33 Industrial Park Road, Pennsville, New Jersey 08070, made application by letter to the Drug Enforcement Administration...

  20. 75 FR 57017 - Venice Gathering System, LLC; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2010-09-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-497-000] Venice Gathering System, LLC; Notice of Request Under Blanket Authorization September 10, 2010. Take notice that on September 3, 2010, Venice Gathering System, LLC (VGS), 1000 Louisiana, Suite 4300, Houston, Texas 77002...

  1. 77 FR 35959 - Atlas Pipeline Mid-Continent WestTex, LLC; Pioneer Natural Resources USA, Inc.; Notice of...

    Science.gov (United States)

    2012-06-15

    ... Mid-Continent WestTex, LLC; Pioneer Natural Resources USA, Inc.; Notice of Application Take notice that on May 30, 2012, Atlas Pipeline Mid-Continent WestTex, LLC (Atlas) and Pioneer Natural Resources... President and General Counsel, Atlas Pipeline Mid-Continent, LLC, 110 W. 7th Street, Suite 2300, Tulsa, OK...

  2. 75 FR 39046 - Russell Brands, LLC, Fabrics Division, a Subsidiary of Fruit of the Loom, Including Employees...

    Science.gov (United States)

    2010-07-07

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-71,116] Russell Brands, LLC..., 2009, applicable to workers of Russell Brands, LLC, Fabrics Division, a subsidiary of Fruit of the Loom... applicable to TA-W-71,116 is hereby issued as follows: All workers of Russell Brands, LLC, Fabric Division, a...

  3. Nova Gas's pipeline to Asia

    International Nuclear Information System (INIS)

    Lea, N.

    1996-01-01

    The involvement of the Calgary-based company NOVA Gas International (NGI) in Malaysia's peninsular gas utilization (PGU) project, was described. Phase I and II of the project involved linking onshore gas processing plants with a natural gas transmission system. Phase III of the PGU project was a gas transmission pipeline that began midway up the west coast of peninsular Malaysia to the Malaysia-Thailand border. The complex 549 km pipeline included route selection, survey and soil investigation, archaeological study, environmental impact assessment, land acquisition, meter-station construction, telecommunication systems and office buildings. NGI was the prime contractor on the project through a joint venture with OGP Technical Services, jointly owned by NGI and Petronas, the Thai state oil company. Much of NGI's success was attributed to excellent interpersonal skills, particularly NGI's ability to build confidence and credibility with its Thai partners

  4. Quantities of natural gas transported in January-December 2009

    International Nuclear Information System (INIS)

    2010-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents the monthly key figures of GRTgaz activity in 2009: Total quantities transmitted by GRTgaz (Inputs to the GRTgaz network/Outputs from the GRTgaz network); Maximum and minimum daily flow (Daily quantities transported, Daily consumption, Daily inputs excluding storage); Quantities exchanged on the wholesale market; Consumption on the GRTgaz Network (gross monthly consumption and Average monthly temperatures)

  5. 75 FR 11936 - Unit Structures LLC, Magnolia, AR; Notice of Termination of Investigation

    Science.gov (United States)

    2010-03-12

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-70,367] Unit Structures LLC, Magnolia, AR; Notice of Termination of Investigation Pursuant to Section 223 of the Trade Act of 1974, as... Arkansas Rapid Response Coordinator on behalf of workers of Unit Structures LLC, Magnolia, Arkansas. The...

  6. 77 FR 2972 - Thunder Bay Power Company, Thunder Bay Power, LLC, et al.

    Science.gov (United States)

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Thunder Bay Power Company, Thunder Bay Power, LLC, et al.; Notice of Application for Transfer of Licenses, and Soliciting Comments and Motions To Intervene Thunder Bay Power Company Project No. 2404-095 Thunder Bay Power, LLC Midwest Hydro, Inc...

  7. 78 FR 30332 - Manufacturer of Controlled Substances, Notice of Application, Austin Pharma, Llc.

    Science.gov (United States)

    2013-05-22

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances, Notice of Application, Austin Pharma, Llc. Pursuant to Sec. 1301.33(a), Title 21 of the Code of Federal Regulations (CFR), this is notice that on March 28, 2013, Austin Pharma, LLC., 811 Paloma Drive, Suite C...

  8. 77 FR 30027 - Manufacturer of Controlled Substances; Notice of Application; Austin Pharma, LLC.

    Science.gov (United States)

    2012-05-21

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances; Notice of Application; Austin Pharma, LLC. Pursuant to Sec. 1301.33(a), Title 21 of the Code of Federal Regulations (CFR), this is notice that on April 11, 2012, Austin Pharma, LLC., 811 Paloma Drive, Suite C...

  9. 78 FR 34091 - Enterprise Liquids Pipeline LLC; Notice of Petition for Declaratory Order

    Science.gov (United States)

    2013-06-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR13-24-000] Enterprise Liquids Pipeline LLC; Notice of Petition for Declaratory Order Take notice that on May 29, 2013, pursuant...), Enterprise Liquids Pipeline LLC filed a petition seeking a declaratory order approving a proposed proration...

  10. 78 FR 46613 - Manufacturer of Controlled Substances; Notice of Application; Siegfried (USA), LLC

    Science.gov (United States)

    2013-08-01

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances; Notice of Application; Siegfried (USA), LLC Pursuant to Sec. 1301.33(a), Title 21 of the Code of Federal Regulations (CFR), this is notice that on June 10, 2013, Siegfried (USA), LLC., 33 Industrial Park Road...

  11. 77 FR 70825 - Manufacturer of Controlled Substances; Notice of Application; Siegfried (USA), LLC

    Science.gov (United States)

    2012-11-27

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances; Notice of Application; Siegfried (USA), LLC Pursuant to Sec. 1301.33(a), Title 21 of the Code of Federal Regulations (CFR), this is notice that on November 5, 2012, Siegfried (USA) LLC, 33 Industrial Park Road...

  12. 78 FR 32458 - Manufacturer of Controlled Substances; Notice of Application; Siegfried USA, LLC

    Science.gov (United States)

    2013-05-30

    ... DEPARTMENT OF JUSTICE Drug Enforcement Administration Manufacturer of Controlled Substances; Notice of Application; Siegfried USA, LLC Pursuant to Sec. 1301.33(a), Title 21 of the Code of Federal Regulations (CFR), this is notice that on April 18, 2013, Siegfried USA, LLC., 33 Industrial Park Road...

  13. 78 FR 2483 - Ohio Terminal Railway Company-Operation Exemption-Hannibal Real Estate, LLC

    Science.gov (United States)

    2013-01-11

    ... Railway Company--Operation Exemption--Hannibal Real Estate, LLC Ohio Terminal Railway Company (OTRC),\\1\\ a... near Hannibal, in Monroe County, Ohio (the Line), pursuant to an operating agreement with Hannibal Real Estate, LLC (Hannibal). \\1\\ OTRC is a wholly owned, corporate subsidiary of Carload Express, Inc. (CEI...

  14. 78 FR 19542 - Neuberger Berman ETF Trust and Neuberger Berman Management LLC; Notice of Application

    Science.gov (United States)

    2013-04-01

    ...] Neuberger Berman ETF Trust and Neuberger Berman Management LLC; Notice of Application March 25, 2013. AGENCY... ETF Trust (the ``Trust'') and Neuberger Berman Management LLC (``NBM'' or [[Page 19543

  15. 75 FR 1362 - WM Renewable Energy, L.L.C.; Notice of Filing

    Science.gov (United States)

    2010-01-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL10-32-000, QF08-622-002] WM Renewable Energy, L.L.C.; Notice of Filing January 4, 2010. Take notice that on December 31, 2009, WM Renewable Energy, L.L.C. filed a petition for a declaratory order, pursuant to Rule 207(a)(2) of...

  16. 77 FR 27508 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE Amex LLC; Notice of Designation...

    Science.gov (United States)

    2012-05-10

    ..., Themis Trading LLC, dated October 17, 2011 (``Themis Letter''); Garret Cook, dated November 4, 2011 (``Cook Letter''); James Johannes, dated November 27, 2011 (``Johannes Letter''); Ken Voorhies, dated...''); Thomas Dercks, dated December 1, 2011 (``Dercks Letter''); Eric Swanson, Secretary, BATS Global Markets...

  17. On the role of the gas environment, electron-dose-rate, and sample on the image resolution in transmission electron microscopy

    DEFF Research Database (Denmark)

    Ek, Martin; Jespersen, Sebastian Pirel Fredsgaard; Damsgaard, Christian Danvad

    2016-01-01

    on the electron-dose-rate. In this article, we demonstrate that both the total and areal electron-dose-rates work as descriptors for the dose-rate-dependent resolution and are related through the illumination area. Furthermore, the resolution degradation was observed to occur gradually over time after......The introduction of gaseous atmospheres in transmission electron microscopy offers the possibility of studying materials in situ under chemically relevant environments. The presence of a gas environment can degrade the resolution. Surprisingly, this phenomenon has been shown to depend...... initializing the illumination of the sample and gas by the electron beam. The resolution was also observed to be sensitive to the electrical conductivity of the sample. These observations can be explained by a charge buildup over the electron-illuminated sample area, caused by the beam–gas–sample interaction...

  18. 78 FR 33051 - Notification of Proposed Production Activity, The Gas Company, LLC dba Hawai'i Gas, Subzone 9F...

    Science.gov (United States)

    2013-06-03

    ... May 22, 2013. The subzone currently has authority to produce synthetic natural gas, carbon dioxide... FTZ procedures could exempt Hawai'i Gas from customs duty payments on the foreign status components... during customs entry procedures that apply to synthetic natural gas, carbon dioxide, hydrogen...

  19. Battery charger with a capacitor-diode clamped LLC resonant converter

    OpenAIRE

    Tsang, C.; Bingham, C.; Foster, M. P.; Stone, D.; Leech, J.

    2016-01-01

    The paper proposes a novel battery charger through use of\\ud two serially-connected LLC resonant converters. The first\\ud stage utilises a capacitor-diode clamped LLC resonant\\ud converter which allows operation in both constant voltage\\ud (CV) and constant current (CC) modes, as found in most\\ud battery chargers, to be realised, whilst the second stage\\ud provides the necessary gain and line and load regulation. A\\ud design example is included that demonstrates the resulting\\ud converter top...

  20. C&S Enterprise, L.L.C.

    Science.gov (United States)

    The EPA is providing notice of a proposed Administrative Penalty Assessment against C & S Enterprise, L.L.C. (“Respondent”), a business located at 2454 480th Ave, Deep River, IA 52222, for alleged violations of the Clean Water Act at property owned by Resp

  1. Controlling Methane Emissions in the Natural Gas Sector. A Review of Federal and State Regulatory Frameworks Governing Production, Gathering, Processing, Transmission, and Distribution

    Energy Technology Data Exchange (ETDEWEB)

    Paranhos, Elizabeth [Energy Innovation Partners, Seoul (South Korea); Kozak, Tracy G. [Energy Innovation Partners, Seoul (South Korea); Boyd, William [Univ. of Colorado, Boulder, CO (United States); Bradbury, James [U.S. Department of Energy, Washington, DC (United States); Steinberg, D. C. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Arent, D. J. [Joint Inst. for Strategic Energy Alaysis, Washington, DC (United States)

    2015-04-23

    This report provides an overview of the regulatory frameworks governing natural gas supply chain infrastructure siting, construction, operation, and maintenance. Information was drawn from a number of sources, including published analyses, government reports, in addition to relevant statutes, court decisions and regulatory language, as needed. The scope includes all onshore facilities that contribute to methane emissions from the natural gas sector, focusing on three areas of state and federal regulations: (1) natural gas pipeline infrastructure siting and transportation service (including gathering, transmission, and distribution pipelines), (2) natural gas pipeline safety, and (3) air emissions associated with the natural gas supply chain. In addition, the report identifies the incentives under current regulatory frameworks to invest in measures to reduce leakage, as well as the barriers facing investment in infrastructure improvement to reduce leakage. Policy recommendations regarding how federal or state authorities could regulate methane emissions are not provided; rather, existing frameworks are identified and some of the options for modifying existing regulations or adopting new regulations to reduce methane leakage are discussed.

  2. 77 FR 24483 - Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To...

    Science.gov (United States)

    2012-04-24

    ... Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To Intervene, and...: Wausau Paper Mills, LLC. e. Name of Project: Rhinelander Hydroelectric Project. f. Location: The upper.... Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC, 515 Davenport St., Rhinelander, Wisconsin...

  3. Balance sheet for the gas system in 2014

    International Nuclear Information System (INIS)

    2015-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents some key figures about GRTgaz activity in 2014: 2014, France's warmest year ever observed (2014, warm / 2013, cold). Total Consumption 2014 vs 2013: -16.5% gross consumption, -5.4% climate adjusted. Public Distribution Consumption 2014 vs 2013: -19.2% gross consumption, -2.2% climate adjusted. Power Generation: -60% since 2011, 2014 vs 2013: -34%. Industrial Consumption has remained stable over the past 10 years. Stable industrial capacity subscriptions (excluding power generation). Transported Quantities by GRTgaz 2014 vs 2013 (-8.4%). Increasing flows from North to South. Imports fall connected to consumption fall, but soften by gas transit flows. Very low LNG imports but LNG was back at the end of 2014. Largely increasing gas transit 2014 vs 2013: +41%. Good level in the UGS at the beginning of the winter 2014/2015. Congestion on North-South link, Congested European North-South corridor. Price spread between North and South disappeared in November and December 2014. In 2014, Gas gross consumption fell by 16.5% in comparison with 2013, essentially because of exceptionally warm climatic conditions. Industrial consumption excluding power generation resists and has remained relatively stable over the past ten years. However gas consumption for power generation continued to fall since 2011. In 2014, GRTgaz's gas transmission network ran under unusual gas flow conditions, especially with a continuing decrease of

  4. 78 FR 20314 - Jefferson Island Storage & Hub, L.L.C.; Notice of Filing

    Science.gov (United States)

    2013-04-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR13-44-000] Jefferson Island Storage & Hub, L.L.C.; Notice of Filing Take notice that on March 28, 2013, Jefferson Island Storage & Hub, L.L.C. filed to revise its Statement of Operating Conditions to among others, update...

  5. 75 FR 32977 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2010-06-10

    ... Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed... Permit Opening Transactions by Market Makers To Accommodate Closing Transactions of Other Market... International Securities Exchange, LLC (``Exchange'' or ``ISE'') filed with the Securities and Exchange...

  6. 77 FR 21106 - Notice of Proposed Reinstatement of Terminated Oil and Gas Lease NDM 95190, North Dakota

    Science.gov (United States)

    2012-04-09

    ..., MBI Oil & Gas LLC, Vincent Melashenko, Missouri River Royalty Corporation, Northern Energy Corporation... these lands. The lessees agree to new lease terms for rentals and royalties of $10 per acre and 16-2/3 percent. The lessees paid the $500 administration fee for the reinstatement of the lease and the $163 cost...

  7. Rarefaction Shock Wave Cutter for Offshore Oil-Gas Platform Removal Final Report CRADA No. TC02009.0

    Energy Technology Data Exchange (ETDEWEB)

    Glenn, L. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Barker, J. [Halliburton Energy Services, Alvarado, TX (United States)

    2017-09-06

    This was a collaborative effort between Lawrence Livermore National Security, LLC/Lawrence Livermore National Laboratory (LLNL) (formerly the University of California) and Jet Research Center, a wholly owned division of Halliburton Energy Services, Inc. to design and prototype an improved explosive cutter for cutting the support legs of offshore oil and gas platforms.

  8. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-081] Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for Partial Transfer of License, and Soliciting...

  9. High Frequency LLC Resonant Converter with Magnetic Shunt Integrated Planar Transformer

    DEFF Research Database (Denmark)

    Li, Mingxiao; Ouyang, Ziwei; Andersen, Michael A. E.

    2018-01-01

    High Frequency LLC requires a smaller resonant inductance which is usually implemented by transformer leakage inductance. However, this small resonant inductance is difficult to deal with a wide input voltage range. This paper proposes a new method to implement a larger resonant inductance by using...... a magnetic shunt integrated into planar transformer. The switching frequency can be greatly narrowed by designing a smaller inductance ratio of magnetizing inductance to resonant inductance. Since this method can well deal with a wide input voltage range without adding extra inductor and increasing the size...... of the transformer, the power density can be improved. The precise leakage inductance calculation method for this transformer and detailed LLC converter design procedure are presented. A 280-380V and 48V-100W half bridge LLC resonant converter with 1 MHz resonant frequency is built to verify the design methodology....

  10. Quantities of natural gas transported in August-December 2007

    International Nuclear Information System (INIS)

    2008-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. This document presents the available monthly key figures of GRTgaz activity from August to December 2007: Total quantities transmitted by GRTgaz (Inputs to the GRTgaz network/Outputs from the GRTgaz network); Maximum and minimum daily flow (Daily quantities transported, Daily consumption, Daily inputs excluding storage); Quantities exchanged on the wholesale market; Consumption on the GRTgaz Network (gross monthly consumption and Average monthly temperatures)

  11. 75 FR 53688 - Southern LNG Company, L.L.C.; Notice of Technical Conference

    Science.gov (United States)

    2010-09-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP10-829-000] Southern LNG Company, L.L.C.; Notice of Technical Conference August 25, 2010. Take notice that Commission Staff will... Street, NE., Washington, DC 20426. On June 7, 2010, Southern LNG Company, L.L.C. (Southern LNG) filed a...

  12. 78 FR 46381 - Calamos Advisors LLC and Calamos ETF Trust; Notice of Application

    Science.gov (United States)

    2013-07-31

    ... Advisors LLC and Calamos ETF Trust; Notice of Application July 24, 2013. AGENCY: Securities and Exchange... sections 12(d)(1)(A) and (B) of the Act. Applicants: Calamos Advisors LLC (``Adviser'') and Calamos ETF... series of the Trust will be the Calamos Focus Growth ETF (the ``Initial Fund''), the investment objective...

  13. 78 FR 11702 - AdvisorShares Investments, LLC and AdvisorShares Trust; Notice of Application

    Science.gov (United States)

    2013-02-19

    ..., American Wealth Management, Trim Tabs Asset Management, LLC, Rockledge Advisors, LLC, Your Source Financial... of Investment Management, Office of Investment Company Regulation). SUPPLEMENTARY INFORMATION: The... organized as a Delaware statutory trust and is registered under the Act as an open-end management investment...

  14. 76 FR 51075 - Self-Regulatory Organizations; International Securities Exchange, LLC; Order Granting Approval to...

    Science.gov (United States)

    2011-08-17

    ... Organizations; International Securities Exchange, LLC; Order Granting Approval to a Proposed Rule Change Relating to Appointments to Competitive Market Makers August 11, 2011. I. Introduction On June 10, 2011, the International Securities Exchange, LLC (the ``Exchange'' or the ``ISE'') filed with the Securities...

  15. 76 FR 64417 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2011-10-18

    ... Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change Relating to Competitive Market Maker Trading Rights October 12, 2011. Pursuant to Section...\\ notice is hereby given that on October 3, 2011, the International Securities Exchange, LLC (the...

  16. 78 FR 68814 - Subzone 183B; Authorization of Production Activity; Samsung Austin Semiconductor, LLC...

    Science.gov (United States)

    2013-11-15

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [B-70-2013] Subzone 183B; Authorization of Production Activity; Samsung Austin Semiconductor, LLC (Semiconductors); Austin, Texas On June 26, 2013, Samsung Austin Semiconductor, LLC submitted a notification of proposed export production activity to the...

  17. 75 FR 68398 - Texas, Oklahoma & Eastern Railroad, LLC-Acquisition and Operation Exemption-Texas, Oklahoma...

    Science.gov (United States)

    2010-11-05

    ... & Eastern Railroad, LLC--Acquisition and Operation Exemption--Texas, Oklahoma & Eastern Railroad Company Texas, Oklahoma & Eastern Railroad, LLC (TOE), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Texas, Oklahoma & Eastern Railroad Company and to operate...

  18. 75 FR 18191 - City of Raleigh; Community Hydro, LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2010-04-09

    ...: Mr. Thomas A. McCormick, Raleigh City Attorney, P.O. Box 590, Raleigh, North Carolina 27601, e-mail tom.mccormick@ci.raleigh.nc.us . For Community Hydro, LLC: Lori Barg, Community Hydro, LLC, 113...

  19. 78 FR 69080 - Houtama Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-11-18

    ... Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 14, 2013, Houtama Hydropower LLC filed an.... Hampton, CEO, Houtama Hydropower [[Page 69081

  20. 75 FR 41855 - Enogex L.L.C.; Notice of Petition for Rate Approval

    Science.gov (United States)

    2010-07-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-52-000] Enogex L.L.C.; Notice of Petition for Rate Approval July 13, 2010. Take notice that on July 1, 2010, Enogex L.L.C. (Enogex) filed pursuant to section 284.123(b)(2) of the Commission's regulations, filed a petition...

  1. 78 FR 63522 - Syntax Analytics, LLC and Syntax ETF Trust; Notice of Application

    Science.gov (United States)

    2013-10-24

    ... Analytics, LLC and Syntax ETF Trust; Notice of Application October 18, 2013. AGENCY: Securities and Exchange... sections 12(d)(1)(A) and (B) of the Act. Applicants: Syntax Analytics, LLC (``Syntax'') and Syntax ETF... exchange-traded fund (``ETF''). \\1\\ All entities that currently intend to rely on the order are named as...

  2. Two-step laser ionization schemes for in-gas laser ionization and spectroscopy of radioactive isotopesa

    OpenAIRE

    Kudryavtsev, Yuri; Ferrer, Rafael; Huyse, Mark; Van den Bergh, Paul; Van Duppen, Piet; Vermeeren, L.

    2014-01-01

    The in-gas laser ionization and spectroscopy technique has been developed at the Leuven isotope separator on-line facility for the production and in-source laser spectroscopy studies of short-lived radioactive isotopes. In this article, results from a study to identify efficient optical schemes for the two-step resonance laser ionization of 18 elements are presented. © 2013 AIP Publishing LLC.

  3. 75 FR 16869 - Areva Enrichment Services, LLC; Establishment of Atomic Safety and Licensing Board

    Science.gov (United States)

    2010-04-02

    ... Enrichment Services, LLC; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by the... following proceeding: Areva Enrichment Services, LLC (Eagle Rock Enrichment Facility) This Board is being established pursuant to a Notice of Hearing and Commission Order regarding the application of Areva Enrichment...

  4. 75 FR 66410 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2010-10-28

    ...-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change Relating to the Sales Value Fee October 22, 2010. Pursuant to Section 19(b... hereby given that, on October 14, 2010, the International Securities Exchange, LLC (the ``Exchange'' or...

  5. 77 FR 1757 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2012-01-11

    ... Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change Relating to a Market Maker Incentive Plan for Foreign Currency Options January 5, 2012...,\\2\\ notice is hereby given that on December 28, 2011, the International Securities Exchange, LLC (the...

  6. 75 FR 42812 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2010-07-22

    ... Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change Relating to a Market Maker Incentive Plan for Foreign Currency Options July 15, 2010..., \\2\\ notice is hereby given that on June 30, 2010, International Securities Exchange, LLC (``ISE'' or...

  7. 77 FR 34436 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing of...

    Science.gov (United States)

    2012-06-11

    ... Organizations; International Securities Exchange, LLC; Notice of Filing of Proposed Rule Change To Temporarily... International Securities Exchange, LLC (the ``Exchange'' or the ``ISE'') filed with the Securities and Exchange... Clearing and Outsourcing Solutions, Inc. (``Apex Clearing'') as an ISE member organization, subject to Apex...

  8. 77 FR 74548 - North Shore Railroad Company-Acquisition and Operation Exemption-PPL Susquehanna, LLC

    Science.gov (United States)

    2012-12-14

    ... Railroad Company--Acquisition and Operation Exemption--PPL Susquehanna, LLC North Shore Railroad Company...., that PPL Susquehanna, LLC (PPLS), and Allegheny Electric Cooperative, Inc. (AEC), the owners of the... extends to an interchange with Norfolk Southern Railway. North Shore states that it provides the only...

  9. 75 FR 26220 - Notice of Intent to Prepare an Environmental Assessment for the Planned Leader One Gas Storage...

    Science.gov (United States)

    2010-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Leader One Energy, LLC] Notice of Intent to Prepare an Environmental Assessment for the Planned Leader One Gas Storage Project, Request for Comments on Environmental Issues, and Notice of a Site Visit April 30, 2010. The staff of the Federal Energy Regulatory Commission (FERC or...

  10. 77 FR 12629 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE Amex LLC; Notice of Filing of...

    Science.gov (United States)

    2012-03-01

    ..., Themis Trading LLC, dated October 17, 2011 (``Themis Letter''); Garret Cook, dated November 4, 2011 (``Cook Letter''); James Johannes, dated November 27, 2011 (``Johannes Letter''); Ken Voorhies, dated... (``UBS Letter''); Dr. Larry Paden, Bright Trading, dated December 1, 2011 (``Paden Letter''); Thomas...

  11. 78 FR 11169 - North Sky River Energy, LLC, et al; Notice of Effectiveness of Exempt Wholesale Generator Status

    Science.gov (United States)

    2013-02-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG13-6-000, et al] North Sky River Energy, LLC, et al; Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. North Sky River Energy, LLC EG13-6-000 Black Bear SO, LLC EG13-7-000 Black Bear Development Holdings...

  12. 77 FR 3766 - PJM Interconnection, L.L.C.; Notice of Staff Technical Conference

    Science.gov (United States)

    2012-01-25

    ... Interconnection, L.L.C.; Notice of Staff Technical Conference On December 14, 2011, the Commission issued an order... Interconnection, L.L.C.'s (PJM) filing.\\1\\ Take notice that the technical conference will be held on February 14...\\ PJM Interconnection, L.L.C., 137 FERC ] 61,204 (2011) (December 14 Order). All interested parties are...

  13. 78 FR 73854 - Combined Notice of Filings #1

    Science.gov (United States)

    2013-12-09

    ... Power Corporation. Description: Notice of Cancellation of Grandfathered Network Integration Transmission... Integration Transmission Service Agreement No. 120 of Niagara Mohawk Power Corporation. Filed Date: 11/26/13...-000. Applicants: KATBRO LLC. Description: Katbro LLC submits notice of cancellation of its market...

  14. Current Mode Control for LLC Series Resonant DC-to-DC Converters

    Directory of Open Access Journals (Sweden)

    Jinhaeng Jang

    2015-06-01

    Full Text Available Conventional voltage mode control only offers limited performance for LLC series resonant DC-to-DC converters experiencing wide variations in operational conditions. When the existing voltage mode control is employed, the closed-loop performance of the converter is directly affected by unavoidable changes in power stage dynamics. Thus, a specific control design optimized at one particular operating point could become unacceptable when the operational condition is varied. This paper presents a new current mode control scheme which could consistently provide good closed-loop performance for LLC resonant converters for the entire operational range. The proposed control scheme employs an additional feedback from the current of the resonant tank network to overcome the limitation of the existing voltage mode control. The superiority of the proposed current mode control over the conventional voltage mode control is verified using an experimental 150 W LLC series resonant DC-to-DC converter.

  15. ASSESSMENT OF LONG TRANSMISSION AND DIS SESSMENT ...

    African Journals Online (AJOL)

    eobe

    cost (AIC) methodology and marginal incremental ... ing, distribution planning, power system economics, long run marginal costing .... and distribution); gas transmission, water supply and ..... future decision making on possible investments.

  16. 76 FR 47627 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2011-08-05

    ... Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change Relating to Two Market Data Feeds August 1, 2011. Pursuant to Section 19(b)(1) of the... on August 1, 2011, the International Securities Exchange, LLC (the ``Exchange'' or the ``ISE'') filed...

  17. 77 FR 37722 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2012-06-22

    ... Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change To Eliminate the Rules and Fees Related to the Second Market June 18, 2012. Pursuant to...\\ notice is hereby given that on June 6, 2012, the International Securities Exchange, LLC (the ``Exchange...

  18. 78 FR 17988 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2013-03-25

    ... Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change Regarding Market Maker Quoting Requirements March 19, 2013. Pursuant to Section 19(b)(1) of... given that on March 5, 2013, the International Securities Exchange, LLC (the ``Exchange'' or the ``ISE...

  19. 76 FR 32382 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2011-06-06

    ... Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change Relating to Second Market Fees May 27, 2011. Pursuant to Section 19(b)(1) of the Securities..., 2011, the International Securities Exchange, LLC (the ``Exchange'' or the ``ISE'') filed with the...

  20. 76 FR 56832 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2011-09-14

    ... Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change Relating to a New Market Data Feed September 8, 2011. Pursuant to Section 19(b)(1) of the... on August 31, 2011, the International Securities Exchange, LLC (the ``Exchange'' or the ``ISE...

  1. 76 FR 37863 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing of...

    Science.gov (United States)

    2011-06-28

    ... Organizations; International Securities Exchange, LLC; Notice of Filing of Proposed Rule Change Relating to Appointments to Competitive Market Makers June 22, 2011. Pursuant to Section 19(b)(1) of the Securities... that on June 10, 2011, the International Securities Exchange, LLC (the ``Exchange'' or the ``ISE...

  2. 76 FR 39155 - R.J. Corman Railroad Property, LLC-Acquisition Exemption-NC Railroad, Inc

    Science.gov (United States)

    2011-07-05

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35363] R.J. Corman Railroad Property, LLC--Acquisition Exemption--NC Railroad, Inc R. J. Corman Railroad Property, LLC (RJC... is related to the notice of exemption in Docket No. FD 35364, R. J. Corman Railroad Company/Bardstown...

  3. 78 FR 6321 - Stephen Phillips, Brentwood Dam Ventures, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-01-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4254-009] Stephen Phillips, Brentwood Dam Ventures, LLC; Notice of Transfer of Exemption 1. By letter filed May 31, 2006 and supplemented on January 15, 2013, Stephen Phillips and Brentwood Dam Ventures, LLC informed the Commission that...

  4. European natural gas

    International Nuclear Information System (INIS)

    Thackeray, Fred

    1999-11-01

    Contains Executive Summary and Chapters on: Main issues; Natural gas consumption and supply: statistics and key features of individual countries; Sectoral natural gas consumption; Indigenous production; Imports; Prices and taxes; The spot market: The interconnector; Forecasts of production and consumption and contracted imports; Progress of markets liberalisation; Effects of environmentalist developments; Transmission networks and storage; Some principal players. (Author)

  5. 77 FR 9225 - Allegheny Electric Cooperative, Inc., et al. v. PJM Interconnection, L.L.C.; Organization of PJM...

    Science.gov (United States)

    2012-02-16

    ...-58-010] Allegheny Electric Cooperative, Inc., et al. v. PJM Interconnection, L.L.C.; Organization of PJM States, Inc., et al. v. PJM Interconnection, L.L.C.; Notice of Filing Take notice that on February... by section 18.17.4 of the Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. and...

  6. 78 FR 6316 - Big Blue Wind Farm, LLC, et al.; Notice of Effectiveness of Exempt Wholesale Generator Status

    Science.gov (United States)

    2013-01-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EG13-1-000, et al.] Big Blue Wind Farm, LLC, et al.; Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Big Blue Wind Farm, LLC EG13-1-000 Calpine Bosque Energy Center, LLC EG13-2-000 Homer City Generation, L.P...

  7. 75 FR 5071 - Mississippi L&D 21, LLC, Mississippi River No. 21 Hydropower Company Lock + TM

    Science.gov (United States)

    2010-02-01

    ... Lock + \\TM\\ Hydro Friends Fund XXXII, LLC; Notice of Preliminary Permit Applications Accepted for..., Lock + TM Hydro Friends Fund XXXII, LLC (Lock + Hydro) filed an application for a preliminary permit...

  8. Modelling gas markets - a survey

    International Nuclear Information System (INIS)

    1997-01-01

    This report reviews research of relevance to the analysis of present and future developments of the European natural gas market. The research activities considered are confined to (1) numerical models for gas markets, (2) analyses of energy demand, and (3) analyses of behaviour and cost structures in the transmission and distribution sector. Most of the market models are strictly micro economic and assume perfect competition or a game-theoretical equilibrium. They use sophisticated solution concepts, but very simplified specifications of supply and demand functions. Most of the research on demand is econometric analyses. These have more detailed model specification than have the aggregated market models. It is found, however, that the econometric literature based on neo-classical economics has not yielded unambiguous results and the specifications disregard important real world aspects of gas demand. The section on demand concludes that the extent of the gas grid is an important determinant for gas demand, but there has been virtually no research on what determines this variable. Data about transmission and distribution of gas in Europe is scarce and only a few non-econometric and virtually no econometric analyses are available. However, some conclusions can be made from relevant North American literature: (1) there has been significant autonomous technical progress in the transmission industry, (2) distribution costs strongly depend on geographical and other conditions, and (3) ownership, whether private or public, may be important for distribution costs and pricing policies. 56 refs., 3 figs., 1 tab

  9. Modelling gas markets - a survey

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This report reviews research of relevance to the analysis of present and future developments of the European natural gas market. The research activities considered are confined to (1) numerical models for gas markets, (2) analyses of energy demand, and (3) analyses of behaviour and cost structures in the transmission and distribution sector. Most of the market models are strictly micro economic and assume perfect competition or a game-theoretical equilibrium. They use sophisticated solution concepts, but very simplified specifications of supply and demand functions. Most of the research on demand is econometric analyses. These have more detailed model specification than have the aggregated market models. It is found, however, that the econometric literature based on neo-classical economics has not yielded unambiguous results and the specifications disregard important real world aspects of gas demand. The section on demand concludes that the extent of the gas grid is an important determinant for gas demand, but there has been virtually no research on what determines this variable. Data about transmission and distribution of gas in Europe is scarce and only a few non-econometric and virtually no econometric analyses are available. However, some conclusions can be made from relevant North American literature: (1) there has been significant autonomous technical progress in the transmission industry, (2) distribution costs strongly depend on geographical and other conditions, and (3) ownership, whether private or public, may be important for distribution costs and pricing policies. 56 refs., 3 figs., 1 tab.

  10. 77 FR 13367 - General Electric-Hitachi Global Laser Enrichment, LLC, Proposed Laser-Based Uranium Enrichment...

    Science.gov (United States)

    2012-03-06

    ... NUCLEAR REGULATORY COMMISSION [NRC-2009-0157] General Electric-Hitachi Global Laser Enrichment, LLC, Proposed Laser-Based Uranium Enrichment Facility, Wilmington, NC AGENCY: Nuclear Regulatory... Impact Statement (EIS) for the proposed General Electric- Hitachi Global Laser Enrichment, LLC (GLE...

  11. Life-cycle greenhouse gas emissions of shale gas, natural gas, coal, and petroleum.

    Science.gov (United States)

    Burnham, Andrew; Han, Jeongwoo; Clark, Corrie E; Wang, Michael; Dunn, Jennifer B; Palou-Rivera, Ignasi

    2012-01-17

    The technologies and practices that have enabled the recent boom in shale gas production have also brought attention to the environmental impacts of its use. It has been debated whether the fugitive methane emissions during natural gas production and transmission outweigh the lower carbon dioxide emissions during combustion when compared to coal and petroleum. Using the current state of knowledge of methane emissions from shale gas, conventional natural gas, coal, and petroleum, we estimated up-to-date life-cycle greenhouse gas emissions. In addition, we developed distribution functions for key parameters in each pathway to examine uncertainty and identify data gaps such as methane emissions from shale gas well completions and conventional natural gas liquid unloadings that need to be further addressed. Our base case results show that shale gas life-cycle emissions are 6% lower than conventional natural gas, 23% lower than gasoline, and 33% lower than coal. However, the range in values for shale and conventional gas overlap, so there is a statistical uncertainty whether shale gas emissions are indeed lower than conventional gas. Moreover, this life-cycle analysis, among other work in this area, provides insight on critical stages that the natural gas industry and government agencies can work together on to reduce the greenhouse gas footprint of natural gas.

  12. 75 FR 43965 - Texas Eastern Transmission, LP; Algonquin Gas Transmission, LLC; Notice of Intent To Prepare an...

    Science.gov (United States)

    2010-07-27

    ...; Visual impacts; Effects on transportation and traffic; Environmental Justice concerns; Effects on the... Commission's website. Please note that the Commission will not accept requests for intervenor status at this... 1-866-208-3676, or for TTY, contact (202) 502-8659. The eLibrary link on the FERC Internet website...

  13. 77 FR 52373 - Self-Regulatory Organizations; NASDAQ Stock Market, LLC; Notice of Filing and Immediate...

    Science.gov (United States)

    2012-08-29

    ...-Regulatory Organizations; NASDAQ Stock Market, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change Relating to Membership in The NASDAQ Stock Market LLC August 23, 2012. Pursuant to Section... is hereby given that on August [[Page 52374

  14. 77 FR 30272 - Combined Notice of Filings #2

    Science.gov (United States)

    2012-05-22

    ... Electric Utilities Corporation, PPL Energy Supply, LLC, PPL EnergyPlus, LLC, PPL Great Works, LLC, PPL... Biogas, LLC, PPL New Jersey Solar, LLC, PPL Renewable Energy, LLC, PPL Susquehanna, LLC, Electric Energy, Inc., Kentucky Utilities Company, LG&E Energy Marketing, Inc., Louisville Gas and Electric Company...

  15. 76 FR 27035 - Combined Notice of Filings #1

    Science.gov (United States)

    2011-05-10

    ... Park, LLC, LSP Safe Harbor Holdings, LLC, LS Power Marketing, LLC, Renaissance Power, L.L.C., Riverside... Funding I, LLC, Armstrong Energy Limited Partnership, L.L.L.P., Calumet Energy Team LLC, Choctaw Gas... Power Resources Management, LLC, GDF SUEZ Energy Marketing NA, Inc., Hopewell Cogeneration Limited...

  16. 78 FR 56224 - Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3401-049] Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption 1. By documentation filed July 8, 2013 and supplemented... Hydro-WM, LLC. The project is located on the Rockfish River in Nelson County, Virginia. The transfer of...

  17. 78 FR 24271 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2013-04-24

    ... Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change To Amend the Market Maker Plus Rebate Program April 18, 2013. Pursuant to Section 19(b)(1... hereby given that on April 10, 2013, the International Securities Exchange, LLC (the ``Exchange'' or the...

  18. 78 FR 45580 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Science.gov (United States)

    2013-07-29

    ... Organizations; International Securities Exchange, LLC; Notice of Filing and Immediate Effectiveness of Proposed Rule Change to Amend Certain Market Maker Fees July 23, 2013. Pursuant to Section 19(b)(1) of the... hereby given that on July 11, 2013, the International Securities Exchange, LLC (the ``Exchange'' or the...

  19. 78 FR 25259 - Notice of Intent To Grant an Exclusive License; Integrata Security, LLC

    Science.gov (United States)

    2013-04-30

    ...; Integrata Security, LLC AGENCY: National Security Agency, DoD. ACTION: Notice. SUMMARY: The National Security Agency hereby gives notice of its intent to grant Integrata Security, LLC a revocable, non.... Patent No. 8,069,483 entitled: ``Device for and Method of Wireless Intrusion Detection,'' issued by the U...

  20. 76 FR 70117 - Notice of Intent To Grant an Exclusive License; Voltage Networking, LLC

    Science.gov (United States)

    2011-11-10

    ...; Voltage Networking, LLC AGENCY: National Security Agency, Department of Defense (DoD). ACTION: Notice. SUMMARY: The National Security Agency hereby gives notice of its intent to grant Voltage Networking, LLC a... described in the following: Patent No. 6,835,581 entitled ``Method of coating optical device facets with...

  1. Development of the Atomic-Resolution Environmental Transmission Electron Microscope

    DEFF Research Database (Denmark)

    Gai, Pratibha L.; Boyes, Edward D.; Yoshida, Kenta

    2016-01-01

    The development of the novel atomic-resolution environmental transmission electron microscope (atomic-resolution ETEM) for directly probing dynamic gas–solid reactions in situ at the atomic level under controlled reaction conditions consisting of gas environment and elevated temperatures is descr......The development of the novel atomic-resolution environmental transmission electron microscope (atomic-resolution ETEM) for directly probing dynamic gas–solid reactions in situ at the atomic level under controlled reaction conditions consisting of gas environment and elevated temperatures...... is used to study steels, graphene, nanowires, etc. In this chapter, the experimental setup of the microscope column and its peripherals are described....

  2. 77 FR 18272 - Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC...

    Science.gov (United States)

    2012-03-27

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 70-3103; NRC-2010-0264] Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC, National Enrichment Facility, Eunice... Louisiana Energy Services (LES), LLC, National enrichment Facility in Eunice, New Mexico, and has verified...

  3. 77 FR 65729 - Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC...

    Science.gov (United States)

    2012-10-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 70-3103; NRC-2010-0264] Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC, National Enrichment Facility, Eunice... Services (LES), LLC, National Enrichment Facility in Eunice, New Mexico, and has verified that cascades...

  4. 77 FR 48148 - Energy Alternatives Wholesale, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2012-08-13

    ... Energy Alternatives Wholesale, LLC's application for market-based rate authority, with an accompanying... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-2413-000] Energy Alternatives Wholesale, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for...

  5. 76 FR 6128 - Energy Exchange International, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2011-02-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-2730-000] Energy Exchange International, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... proceeding Energy Exchange International, LLC's application for market-based rate authority, with an...

  6. 76 FR 2711 - Cinram Distribution, LLC, a Subsidiary of Cinram International, Simi Valley Distribution Center...

    Science.gov (United States)

    2011-01-14

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,357] Cinram Distribution, LLC, a Subsidiary of Cinram International, Simi Valley Distribution Center, Including On-Site Leased... of Cinram Distribution, LLC, a subsidiary of Cinram International, Simi Valley Distribution Center...

  7. 76 FR 1613 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-01-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13877-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications January 4, 2011. On November 4, 2010, Mahoning Hydro, LLC...

  8. 77 FR 52016 - Brookfield Smoky Mountain Hydropower LLC; Supplemental Notice That Initial Market-Based Rate...

    Science.gov (United States)

    2012-08-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-2447-001] Brookfield Smoky Mountain Hydropower LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes... proceeding, of Brookfield Smoky Mountain Hydropower LLC's application for market- based rate authority, with...

  9. 77 FR 65025 - Trust for Professional Managers and Collins Capital Investments, LLC; Notice of Application

    Science.gov (United States)

    2012-10-24

    ... SECURITIES AND EXCHANGE COMMISSION [Investment Company Act Release No. 30235; 812-14012] Trust for Professional Managers and Collins Capital Investments, LLC; Notice of Application October 18, 2012. AGENCY...: Trust for Professional Managers (the ``Trust'') and Collins Capital Investments, LLC (the ``Advisor...

  10. Role of technology in the U. K. gas industry. past, present, future

    Energy Technology Data Exchange (ETDEWEB)

    Evans, J W

    1979-06-01

    A discussion covers the beginning of public gas supply in the U.K.; the production of gas during coal combustion and the oil era; the development of LNG transport technology; the development of the Dent processes for producing gases from hydrocarbon feedstocks including the Catalytic Rich Gas and the Gas Recycle Hydrogenation processes; the growth of the natural gas transmission and distribution industry; the organization and functions of the British Gas Corp. Research and Development Division and Scientific Services; the various technological innovations being used in the transmission, distribution, domestic and industrial utilization sectors of the gas industry; the various efforts leading to the development of a commercial SNG process, based on the Lurgi coal gasifier operated under slagging conditions, that can handle a wide range of coals; and the outlook for future gas supply and demand, a hydrogen economy-based gas industry, and new developments affecting gas transmission and distribution, conservation and utilization.

  11. 77 FR 14838 - General Electric-Hitachi Global Laser Enrichment LLC, Commercial Laser-Based Uranium Enrichment...

    Science.gov (United States)

    2012-03-13

    ... Laser Enrichment LLC, Commercial Laser-Based Uranium Enrichment Facility, Wilmington, North Carolina... a license to General Electric-Hitachi Global Laser Enrichment LLC (GLE or the applicant) to authorize construction of a laser-based uranium enrichment facility and possession and use of byproduct...

  12. 78 FR 61387 - Supermedia LLC, Publishing Operations Divison, Account Management Group, a Subsidiary of Dex...

    Science.gov (United States)

    2013-10-03

    ... LLC, Publishing Operations Divison, Account Management Group, a Subsidiary of Dex Media Inc..., Publishing Operations Divison, Listing Management Group, a Subsidiary of Dex Media Inc., Including On-Site... to workers and former workers of SuperMedia LLC, Publishing Operation Division, Account Management...

  13. 78 FR 47051 - Clarkdale Arizona Central Railroad, L.C.-Trackage Rights Exemption-Drake Cement, LLC

    Science.gov (United States)

    2013-08-02

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35742] Clarkdale Arizona Central Railroad, L.C.--Trackage Rights Exemption--Drake Cement, LLC Drake Cement, LLC (Drake), pursuant to a written Trackage Rights Agreement (Agreement) dated May 11, 2012, has agreed to grant overhead...

  14. 78 FR 28214 - Gainesville Renewable Energy Center, LLC; Supplemental Notice That Initial Market-Based Rate...

    Science.gov (United States)

    2013-05-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-1348-000] Gainesville Renewable Energy Center, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Gainesville Renewable Energy Center, LLC's application for market- based rate authority, with an accompanying...

  15. 78 FR 40473 - Plainfield Renewable Energy, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2013-07-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-1734-000] Plainfield Renewable Energy, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Plainfield Renewable Energy, LLC's application for market-based rate authority, with an accompanying rate...

  16. 77 FR 64980 - Chesapeake Renewable Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2012-10-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-28-000] Chesapeake Renewable Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket... proceeding of Chesapeake Renewable Energy LLC's application for market-based rate authority, with an...

  17. 77 FR 9226 - Physical Systems Integration, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-1013-000] Physical Systems Integration, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Physical Systems Integration, LLC's application for market-based rate authority, with an accompanying rate...

  18. 75 FR 41855 - Stream Energy Pennsylvania, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2010-07-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER10-1750-000] Stream Energy Pennsylvania, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket... of Stream Energy Pennsylvania, LLC's application for market-based rate authority, with an...

  19. 77 FR 71679 - Bridgestone Americas Tire Operations, LLC, Receipt of Petition for Decision of Inconsequential...

    Science.gov (United States)

    2012-12-03

    ... noncompliant tires are mislabeled; the subject tires meet or exceed all performance requirements as required in...-0108; Notice 1] Bridgestone Americas Tire Operations, LLC, Receipt of Petition for Decision of... petition. SUMMARY: Bridgestone Americas Tire Operations, LLC (BRIDGESTONE),\\1\\ has determined that certain...

  20. 76 FR 6459 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13954-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power...

  1. 76 FR 7838 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13953-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power...

  2. 75 FR 8321 - Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-02-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 13619-000 Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications February 18, 2010. On November 5, 2009, Coastal Hydropower LLC filed...

  3. 76 FR 72978 - Premier Trim, LLC, Spectrum Trim, LLC and Grant Products International, Inc. D/B/A Spectrum Grant...

    Science.gov (United States)

    2011-11-28

    ..., Spectrum Trim, LLC and Grant Products International, Inc. D/B/A Spectrum Grant De Mexico Including Workers Whose Unemployment Insurance (UI) Wages Are Paid Through Grant Products International, Inc... Brownsville, TX; Amended Certification Regarding Eligibility To Apply for Worker Adjustment Assistance In...

  4. 77 FR 23241 - Lock+ Hydro Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2012-04-18

    ... Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: February 20, 2012. d. Submitted By: Lock+ Hydro Friends Fund XXX, LLC. e. Name of Project... Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XXX, c/o Hydro Green Energy, LLC, 900...

  5. Nova Gas`s pipeline to Asia

    Energy Technology Data Exchange (ETDEWEB)

    Lea, N.

    1996-01-01

    The involvement of the Calgary-based company NOVA Gas International (NGI) in Malaysia`s peninsular gas utilization (PGU) project, was described. Phase I and II of the project involved linking onshore gas processing plants with a natural gas transmission system. Phase III of the PGU project was a gas transmission pipeline that began midway up the west coast of peninsular Malaysia to the Malaysia-Thailand border. The complex 549 km pipeline included route selection, survey and soil investigation, archaeological study, environmental impact assessment, land acquisition, meter-station construction, telecommunication systems and office buildings. NGI was the prime contractor on the project through a joint venture with OGP Technical Services, jointly owned by NGI and Petronas, the Thai state oil company. Much of NGI`s success was attributed to excellent interpersonal skills, particularly NGI`s ability to build confidence and credibility with its Thai partners.

  6. 77 FR 65543 - Energy Corporation of America; Eastern American Energy Corporation; First ECA Midstream LLC...

    Science.gov (United States)

    2012-10-29

    ... Corporation of America; Eastern American Energy Corporation; First ECA Midstream LLC; Notice of Application Take notice that on October 16, 2012, Energy Corporation of America and Eastern American Energy Corporation (collectively, ECA), and First ECA Midstream LLC (First ECA Midstream), 501 56th Street SE...

  7. 76 FR 58784 - Bad Boy Enterprises, LLC, Provisional Acceptance of a Settlement Agreement and Order

    Science.gov (United States)

    2011-09-22

    ... CONSUMER PRODUCT SAFETY COMMISSION [CPSC Docket No. 11-C0011] Bad Boy Enterprises, LLC... 1118.20(e). Published below is a provisionally-accepted Settlement Agreement with Bad Boy Enterprises..., Bad Boy Enterprises, LLC (``Bad Boy'') and staff (``Staff'') of the United States Consumer Product...

  8. 78 FR 54298 - Horizons ETFs Management (USA) LLC and Horizons ETF Trust; Notice of Application

    Science.gov (United States)

    2013-09-03

    ... ETFs Management (USA) LLC and Horizons ETF Trust; Notice of Application August 27, 2013. AGENCY... Management (USA) LLC (``Horizons'') and Horizons ETF Trust (the ``Trust''). Summary of Application... of the Trust will be the Horizons Active Global Dividend ETF (the ``Initial Fund''), which will seek...

  9. 75 FR 4058 - CRD Hydroelectric, LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Science.gov (United States)

    2010-01-26

    ... Hydroelectric, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: CRD Hydroelectric, LLC. e. Name of Project: Red Rock Hydroelectric Project. f. Location: On the...

  10. 78 FR 3928 - Self-Regulatory Organizations; The NASDAQ Stock Market LLC; Order Disapproving Proposed Rule...

    Science.gov (United States)

    2013-01-17

    ...-Regulatory Organizations; The NASDAQ Stock Market LLC; Order Disapproving Proposed Rule Change To Establish ``Benchmark Orders'' Under NASDAQ Rule 4751(f) January 11, 2013. I. Introduction On May 1, 2012, The NASDAQ Stock Market LLC (``NASDAQ'' or ``Exchange'') filed with the Securities and Exchange Commission...

  11. 78 FR 14531 - French River Land Company, Northwoods Renewables LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5638-002] French River Land Company, Northwoods Renewables LLC; Notice of Transfer of Exemption 1. By letter filed February 21, 2013, French River Land Company and Northwoods Renewables LLC informed the Commission that the exemption from...

  12. 77 FR 58375 - Inglis Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-09-20

    ... Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 18, 2012, Inglis Hydropower, LLC filed an... study the feasibility of a hydropower project located at the Inglis Bypass Channel, located on the...

  13. 75 FR 59706 - Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-09-28

    ... Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... on July 16, 2010, Coastal Hydropower, LLC filed an application for a preliminary permit, pursuant to... generation of the project would be 7.9 gigawatt-hours. Applicant Contact: Neil Anderson, Coastal Hydropower...

  14. 75 FR 65620 - Inglis Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Science.gov (United States)

    2010-10-26

    ... Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...: Inglis Hydropower, LLC. e. Name of Project: Inglis Hydropower Project. f. Location: The project would be... ready for environmental analysis at this time. l. The proposed 2.0-megawatt Inglis Hydropower Project...

  15. 77 FR 76319 - Self-Regulatory Organizations; BOX Options Exchange LLC; Order Approving Minor Rule Violation...

    Science.gov (United States)

    2012-12-27

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-68489; File No. 4-655] Self-Regulatory Organizations; BOX Options Exchange LLC; Order Approving Minor Rule Violation Plan for BOX Options Exchange LLC... \\4\\ requiring that a self-regulatory organization (``SRO'') promptly file notice with the Commission...

  16. 78 FR 43874 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2013-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13-514-000] Texas Eastern Transmission, LP; Notice of Application On July 2, 2013, Texas Eastern Transmission, LP (Texas Eastern) filed... natural gas facilities no longer in service. As described more fully in the Application, Texas Eastern...

  17. 77 FR 29753 - CaterParrott Railnet, L.L.C.-Sublease and Operation Exemption-Georgia & Florida Railway, L.L.C.

    Science.gov (United States)

    2012-05-18

    ... Railnet, L.L.C.--Sublease and Operation Exemption-- Georgia & Florida Railway, L.L.C. CaterParrott Railnet, L.L.C. (CPR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to sublease from Georgia & Florida Railway, L.L.C. (GRF) and operate approximately 43.2 miles of rail line...

  18. 76 FR 78021 - Notice of Availability of the Record of Decision for the Rice Solar Energy, LLC, Rice Solar...

    Science.gov (United States)

    2011-12-15

    ... LVRWB10B3780] Notice of Availability of the Record of Decision for the Rice Solar Energy, LLC, Rice Solar... Solar Energy, LLC, a subsidiary of SolarReserve, LLC plans to construct a 150 megawatt (MW) solar... allows solar energy to be captured throughout the day and retained in a molten salt heat transfer fluid...

  19. 75 FR 11155 - Combined Notice of Filings No. 1

    Science.gov (United States)

    2010-03-10

    ... Transmission Tariff intended to implement a rate change for Southwestern Power Administration pricing zone...., LLC; Elk Hills Power, LLC; Mesquite Power, LLC; MxEnergy Electric Inc.; Sempra Energy Solutions LLC..., 2010. Docket Numbers: ER99-2992-014; ER02-2509-013; ER94-389-037. Applicants: Tenaska Power Services Co...

  20. Natural gas market assessment ten years after deregulation

    International Nuclear Information System (INIS)

    1996-11-01

    Changes which have taken place in the Canadian natural gas market in the ten years since the gas market was de-regulated, were reviewed. A 1985 agreement created conditions for a competitive natural gas market. However, the National Energy Board ensured that the pipeline transmission sector of the gas industry would continue to be regulated because of its natural monopoly characteristics. Open non-discriminatory access was to be provided to all shippers on inter-provincial gas pipelines. One objective of this report was to provide the Board with the means of assuring itself that the market was operating in such a way that Canadian requirements for natural gas were being met at fair market prices. The report also provided a review of the major changes in the gas producing and transmission sector, and reviewed developments in gas markets and sales practices. The overall assessment was that the natural gas industry was efficient and responsive to the demands of the marketplace. 5 tabs., 30 figs