WorldWideScience

Sample records for gas pipeline projects

  1. Gas elephants: Arctic projects revived by expanding markets and pipelines

    International Nuclear Information System (INIS)

    Jaremko, G.

    2000-01-01

    The revival of interest in Arctic natural gas and the developing competition to extend the pipeline grid to Alaska and the Yukon and the Northwest territories are the subject of this report. Substantial agreement between competing interest groups is reported with respect to the need for Arctic gas and the willingness of the market to pay for bringing it south to consumers. The discussion centers on the construction of the Alliance Pipeline Project that will reportedly bring two billion cubic feet per day of excess capacity to transport natural gas from northeastern British Columbia to Chicago, and the 2,400 km long Foothills Pipelines System that carries about one-third of Canadian gas exports to middle-western states and California. Plans are to extend the line to 5,240 km by laying pipe in a giant Y pattern between Prudhoe Bay and the Mackenzie delta in the north, and the start of the Foothills System at Caroline in central Alberta. The estimated cost of the line is about $US 6 billion, using a 36-inch diameter line at increased pressures in place of the 56-inch diameter pipe used in the 1970s. Construction plans are similar for the rest of the big Y, the Dempster Lateral beside the Dempster Highway between Whitehorse and Inuvik. A competing project, the Northern Gas Pipeline Project is also discussed. This line would run east of Prudhoe Bay under the Beaufort Sea to the Mackenzie Delta; then south along the Mackenzie Valley to Alberta. Cost of this line is also estimated at $US 6 billion, however, it would have a capacity of four billion cubic feet per day, including 2.5 billion cubic feet from Alaska and 1.5 billion cubic feet from Canada. Strong revival of interest is also reported from the supply side, with BP Amoco, ARCO, Chevron Canada Resources, Ranger 0il Ltd., Paramount Resources, Berkley Petroleum Corporation, Canadian Forest Oil, Alberta Energy Company, Petro-Canada, Anderson Resources, and Poco Petroleum Ltd., all showing interest to mount new

  2. 75 FR 8245 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2010-02-24

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 18, 2010. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: This final..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy Projects...

  3. 76 FR 8293 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2011-02-14

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 8, 2011. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: Effective... of Subjects in 18 CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  4. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2012-02-15

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 9, 2012. AGENCY: Federal Energy Regulatory... limits for natural gas pipelines blanket construction certificates for each calendar year. DATES: This... CFR Part 157 Administrative practice and procedure, Natural gas, Reporting and recordkeeping...

  5. Europe's gas imports via pipelines. Projects and safety aspects; Europas Gasimporte durch Pipelines. Projekte und Sicherheitsaspekte

    Energy Technology Data Exchange (ETDEWEB)

    Goetz, R.

    2008-08-15

    By the year 2030 Europe's gas imports will have risen to approximately 200 bn m{sup 3}, necessitating the installation of new pipelines and LNG terminals. The largest growth in imports is not expected from Russia but from Africa and the Near East. An analysis of projected pipelines demonstrates these regions' contribution to securing Europe's gas supply. Because they help to establish market dominance or to fend off potential competitors these pipelines also serve corporate strategies. The most reliable supply will continue to come from Norway. By contrast, gas imports via pipelines from North Africa, Russia and the Persian Gulf all carry high risks of approximately the same degree. The greatest risks are associated with gas imports from the Caspian Sea.

  6. Basic study for Joint Implementation Pipeline System Optimization Project including rehabilitation of gas pipeline in Ukraine for greenhouse gas reduction

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a study was conducted of a project for repair/optimization of the Shebelinka, Dikanka-Kyiv, gas pipeline system in the Republic of Ukraine. As a result of the study, the following plans were proposed. The gas turbine compressor now in use has been used more than 30 years, and is needed to be changed due to the superannuation. Changes are needed of the equipment used for pipeline inspection, corrosion prevention equipment, damaged data collecting equipment, pressure detection automatic drive valve, etc. Further needed are a portable compressor by which repair work can be done without gas release into the atmospheric air. The investment required for repair/installation of these equipment totaled approximately 216 million dollars. This brings the reduction in greenhouse effect gas emissions of 512,000 tons/year, and the energy conservation of 103,000 tons/year of crude oil or its equivalent. These are estimated at about 10 million dollars in greenhouse effect gas reduction and at 15 million dollars in energy conservation. (NEDO)

  7. Prospects of natural gas demand and pipeline projects in the East Asia

    International Nuclear Information System (INIS)

    Ishii, A.

    1997-01-01

    The development of the natural gas industry in East Asia was discussed. It was predicted that by 2010, the demand for natural gas could potentially reach 80 billion cubic feet per day. This represents an 8 per cent per year growth rate from a 1995 baseline. Similarly, it was predicted that by 2010, the region's natural gas supply could potentially reach 65 billion cubic feet per day which would represent 2.5 times the supply of natural gas in 1995. The additional demand will most likely be supplied from the Middle East in the form of liquefied natural gas (LNG), from Eastern Russia through pipelines of LNG, or from North America in the form of LNG. Some gas may also be supplied from Central Asia through pipelines. The price and cost of natural gas are major uncertainties in the future of the East Asian gas demand. Pipeline projects from Russia to China were discussed. Japan and Korea are also interested in collaborating on the feasibility study with Russia and China on a 3,400 km pipeline of 60 inch diameter from the Koviktinskoye gas field through Mongolia to Beijing, Tianjin and Korea, transporting 20 to 30 billion cubic metres of gas annually. A natural gas pipeline project transporting gas from the southern edge of the Sakhalin Island to the Tokyo area was also discussed. The project would involve construction of a 2,200 km 40-48 inch pipeline, much of it undersea, transporting 6 to 12 million tonnes of liquid natural gas, annually

  8. Pipeline politics—A study of India′s proposed cross border gas projects

    International Nuclear Information System (INIS)

    Nathan, Hippu Salk Kristle; Kulkarni, Sanket Sudhir; Ahuja, Dilip R.

    2013-01-01

    India′s energy situation is characterized by increasing energy demand, high fossil fuel dependency, large import shares, and significant portion of population deprived of modern energy services. At this juncture, natural gas, being the cleanest fossil fuel with high efficiency and cost effectiveness, is expected to play an important role. India, with only 0.6% of proven world reserves, is not endowed with adequate natural gas domestically. Nevertheless, there are gas reserves in neighbouring regions which gives rise to the prospects of three cross border gas pipeline projects, namely, Iran–Pakistan–India, Turkmenistan–Afghanistan–Pakistan–India, and Myanmar–Bangladesh–India. This study is a political analysis of these pipeline projects. First, it provides justification on use of natural gas and promotion of cross border energy trade. Then it examines these three pipeline projects and analyses the security concerns, role of different actors, their positions, shifting goals, and strategies. The study develops scenarios on the basis of changing circumstances and discusses some of the pertinent issues like technology options for underground/underwater pipelines and role of private players. It also explores impact of India′s broader foreign relations and role of SAARC on the future of pipelines and proposes energy induced mutually assured protection (MAP) as a concept for regional security. -- Highlights: •We justify the need for cross border energy trade through gas pipelines for India. •We examine prospective pipeline projects—IPI, TAPI, MBI and their security issues. •We develop scenarios and analyze role of actors, their positions, and strategies. •We discuss technology and policy options for realizing these gas pipelines. •We propose energy induced mutually assured protection (MAP) for regional security

  9. Capital structure in LNG infrastructures and gas pipelines projects: Empirical evidences and methodological issues

    International Nuclear Information System (INIS)

    Pierru, Axel; Roussanaly, Simon; Sabathier, Jérôme

    2013-01-01

    This paper provides new empirical insights on the capital structure of project-financed LNG infrastructures and gas pipeline projects, by using data relating to projects whose financial close occurred between June 2004 and March 2011. Most results are consistent with the basic view of risk-averse funds suppliers. Especially, the projects located in risky countries and larger projects tend to exhibit lower debt ratios and less-concentrated equity ownerships. In addition, regasification projects appear to have a more diluted equity ownership. Methodological issues raised by the financing of these projects are also examined from a capital-budgeting perspective. In particular, the equity residual method, usually used by industrial practitioners to value these projects, should be adjusted. - Highlights: • This paper provides new empirical insights on the capital structure of project-financed LNG and gas pipeline infrastructures. • Most of our results are consistent with the basic view of risk-averse funds suppliers. • Projects located in risky countries exhibit lower debt ratios and less-concentrated equity ownerships. • Larger projects and regasification projects also have less concentrated equity ownerships. • From a capital-budgeting viewpoint, we examine methodological issues raised by the financing of these projects

  10. China's modern day Great Wall : the 40 inch West to East Gas Pipeline Project

    International Nuclear Information System (INIS)

    Gray, L.A.B.

    2004-01-01

    In order to fuel China's economic growth, PetroChina began construction of the West to East Natural Gas Pipeline Project (WEPP) in 2001 to transport large quantities of natural gas reserves from the Tarim Basin in the Xinjiang Autonomous Region in far western China to markets in eastern China. The WEPP is the first large diameter, cross-country pipeline project ever constructed in China, and was the first to use automatic welding and automatic ultrasonic inspection on pipelines in China. This paper addressed the management, engineering, procurement and construction challenges of the WEPP. Upon completion of the 3,800 km, 1.016 mm mainline pipeline, construction will begin on other major facilities, such 294 km of lateral line, dual fiber optic conduits with the mainline, 1,100 km of access roads, 23 metering stations, 18 pigging stations, 10 compressor stations, 16 mountain tunnels, 16 aerial crossings, 1 crossing of the Yangtze River, 3 crossings of the Yellow River, a gas control center, and SCADA system. Houston-based Universal Ensco Inc. was awarded a contract to perform a feasibility study as well as a construction supervision contract by PetroChina for the WEPP. Universal also designed a gas turbine drive compressor station at Lunnan and an electric drive compressor station at Zhengzhou. This paper demonstrated that business in China for foreign companies in the pipeline industry is evolving and several changes can be expected as the state planned economy is reformed to a free market economy. 4 refs., 5 tabs., 17 figs.

  11. Risk analysis for construction and operation of gas pipeline projects in pakistan

    International Nuclear Information System (INIS)

    Mubin, S.; Mubin, G.

    2008-01-01

    In order to cater for its high energy demand, Pakistan is planning to import natural gas through pipelines from neighboring countries. For fully utilizing the imported gas, providing it to end customers, the infrastructure of gas pipeline needs to be developed. Therefore, huge investment has been done and proposed in this sector in coming future. Considering geological, topographical, geopolitical and climatic conditions of the country, there is added risk of earthquake, landslides and floods. Due to current geopolitical situation there is a persistent threat of unrest and terrorism in the country. Instable Government policies, high rate of inflation, rapid change in material prices are also important risk factors. All these factors make the situation very complex in quantifying the risk especially for a project in which the risk impact factor rises exponentially in case of risk occurrence. In this paper, most appropriate risk classification is made based on technological, organizational, political, natural climatic, security and environmental risk factors. Effort has been made to device a simpler risk management methodology to analyze and manage risks of gas pipeline project. In the proposed risk management model Monte Carlo simulation has been used to identify critical risks. (author)

  12. The political economy of trans-Pakistan gas pipeline project: assessing the political and economic risks for India

    International Nuclear Information System (INIS)

    Pandian, S.

    2005-01-01

    There is a growing realisation among Indian policy makers to consider the import of natural gas to address India's growing energy demand. Among many policy options to import natural gas, Indo-Iran overland pipeline option is considered to be effective and economical in addressing India's long-term energy demands. Such a pipeline would have to traverse Pakistani territory thereby necessitating a role for Pakistan in the pipeline project. Though security guarantees have been offered, India refuses to entertain the role of Pakistan in the project for a fear of its energy supply being disrupted in case of a military conflict with Pakistan. This paper argues that gas pipeline project is not only aimed at addressing India's energy concerns but also to further its strategic objectives. This paper contends that India, Iran and Pakistan do not have shared objective to make the overland project a political and commercial reality. India's stakes in the overland pipeline project are high as India's economic interests in the pipeline project are not in congruence with the politico-economic and strategic objectives of Iran and Pakistan. (author)

  13. Nova Gas's pipeline to Asia

    International Nuclear Information System (INIS)

    Lea, N.

    1996-01-01

    The involvement of the Calgary-based company NOVA Gas International (NGI) in Malaysia's peninsular gas utilization (PGU) project, was described. Phase I and II of the project involved linking onshore gas processing plants with a natural gas transmission system. Phase III of the PGU project was a gas transmission pipeline that began midway up the west coast of peninsular Malaysia to the Malaysia-Thailand border. The complex 549 km pipeline included route selection, survey and soil investigation, archaeological study, environmental impact assessment, land acquisition, meter-station construction, telecommunication systems and office buildings. NGI was the prime contractor on the project through a joint venture with OGP Technical Services, jointly owned by NGI and Petronas, the Thai state oil company. Much of NGI's success was attributed to excellent interpersonal skills, particularly NGI's ability to build confidence and credibility with its Thai partners

  14. Development of cross border gas transmission projects raise challenging issues. Case studies: The transmed and the Maghreb/Europe pipelines

    International Nuclear Information System (INIS)

    Khene, D.

    1997-01-01

    Development of cross border gas transmission projects raise complex and interdependent issues whose successful resolution require not only technical and management strengths but also a close cooperation between the key players involved in the game. In this paper we shall attempt to explain some of the major issues encountered during the appraisal and construction of long distance gas pipeline schemes. The information used derive essentially from the experience gained during the development of the Trans-mediterranean and the Maghreb/Europe pipelines. Running through the various issues we shall also identify and then discuss a number of factors which contributed to the successful implementation of these two projects. (au)

  15. Analyzing Drivers of Conflict in Energy Infrastructure Projects: Empirical Case Study of Natural Gas Pipeline Sectors

    Directory of Open Access Journals (Sweden)

    Chan Young Park

    2017-11-01

    Full Text Available Energy infrastructure projects have caused various conflicts between stakeholders, particularly among the residents around construction sites and operators. The conflicts are largely due to the “Not in My Backyard” mentality associated with hazardous projects. In natural gas pipeline (NGP projects, conflicts have been increasing with the increase in a wider range of linear projects, and they have been worsening because of the lack of clear countermeasures. This study proposes an effective conflict management strategy for NGP projects in Korea. To achieve the objectives, 25 conflict drivers were identified and 143 case-based surveys were conducted to determine the causal relationship between the drivers and the level of conflict using structural equation modeling (SEM. The SEM results show that factors such as economic (e.g., decreased value of the land, construction-related (e.g., disturbance due to using the original route and site, and safety-related characteristics (e.g., concerns about explosions and accidents are the most important in understanding the causes of conflicts. Based on the causal relationship, five key strategies were proposed to manage the critical conflicts. This study can serve as a basis for implementing better conflict management plans in the future for a more sustainable project execution.

  16. Natural gas pipeline technology overview.

    Energy Technology Data Exchange (ETDEWEB)

    Folga, S. M.; Decision and Information Sciences

    2007-11-01

    The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by

  17. Impact of the Vancouver Island natural gas pipeline construction on water quality: Project report

    Energy Technology Data Exchange (ETDEWEB)

    Li, G

    1993-01-01

    Prior to the construction of the Vancouver Island natural gas pipeline, concern was expressed for the potential defilement of community domestic water supplies when the construction work occurred in community watersheds. When drinking water becomes turbid from rainfall runoff passing through construction sites, the community disinfection process is rendered inefficacious. At a specified turbidity level, the water becomes too risky to drink without alternative disinfection such as boiling. This situation creates significant administrative problems for local health officials, intolerable social problems for residents and processing problems for industries which require clean water. This document is a review of the weekly environmental surveillance reports submitted by D. Tripp Biological Consultants to the B.C. Utilities Commission. The material is organized to relate construction practices with weather patterns thereby showing the resultant effects on water quality (turbidity).

  18. Market Brief : Turkey oil and gas pipelines

    International Nuclear Information System (INIS)

    2001-08-01

    This report presented some quick facts about oil and gas pipelines in Turkey and presented opportunities for trade. The key players and customers in the oil and gas sector were described along with an export check list. Turkey is looking into becoming an energy bridge between oil and gas producing countries in the Middle East, Central Asia and Europe. The oil and gas sectors are dominated by the Turkish Petroleum Corporation, a public enterprise dealing with exploration and production, and the State Pipeline Corporation which deals with energy transmission. They are also the key buyers of oil and gas equipment in Turkey. There are several pipelines connecting countries bordering the Caspian Sea. Opportunities exist in the areas of engineering consulting as well as contracting services for oil and gas pipeline transmission and distribution. Other opportunities lie in the area of pipeline construction, rehabilitation, materials, equipment, installation, and supervisory control and data acquisition (SCADA) systems. Currently, the major players are suppliers from Italy, Germany, France, United States and Japan. Turkey has no trade barriers and imported equipment and materials are not subjected to any restriction. The oil and gas market in Turkey expected in increase by an average annual growth rate of 15 per cent from 2001 to 2003. A brief description of pipeline projects in Turkey was presented in this report along with a list of key contacts and support services. 25 refs., 1 append

  19. Nova Gas`s pipeline to Asia

    Energy Technology Data Exchange (ETDEWEB)

    Lea, N.

    1996-01-01

    The involvement of the Calgary-based company NOVA Gas International (NGI) in Malaysia`s peninsular gas utilization (PGU) project, was described. Phase I and II of the project involved linking onshore gas processing plants with a natural gas transmission system. Phase III of the PGU project was a gas transmission pipeline that began midway up the west coast of peninsular Malaysia to the Malaysia-Thailand border. The complex 549 km pipeline included route selection, survey and soil investigation, archaeological study, environmental impact assessment, land acquisition, meter-station construction, telecommunication systems and office buildings. NGI was the prime contractor on the project through a joint venture with OGP Technical Services, jointly owned by NGI and Petronas, the Thai state oil company. Much of NGI`s success was attributed to excellent interpersonal skills, particularly NGI`s ability to build confidence and credibility with its Thai partners.

  20. Economic and Strategic Expectations from Trans Anatolian Natural Gas Pipeline Project

    Directory of Open Access Journals (Sweden)

    Elchin Suleymanov

    2016-12-01

    Full Text Available Following the successful implementation of the oil strategy, Azerbaijan began to define strategic objectives in relation to gas export policy. Currently, Azerbaijan is the only country in the region exporting gas to the international markets (Turkey, Russia, Georgia. For this reason, it is seen as “the provider and participant” of Southern Gas Corridor by EU. In this direction, Azerbaijan aims to be the country of an important and strategic natural gas exporter. From Shahdeniz field to the end European user, it targets to take part in the every ring of the value chain. These assumptions bring Azerbaijan to the position of a remarkable natural gas supplier for the export of large amount of gas to the European markets through Nabucco West. The implementation of the project with financial and technical capabilities of Azerbaijan and Turkey has made it a project to be realized between Turkey-Azerbaijan. TANAP means Turkey and Azerbaijan will emerge together in the European market for energy transportation. Along with Baku-Tbilisi-Ceyhan and Baku-Tbilisi-Erzurum, TANAP has reinforced Turkey’s position as a necessary energy corridor in delivering the energy resources of the Caspian Sea to the Western markets. In this paper, expected strategic and economic outcomes of TANAP are analyzed.

  1. 76 FR 53086 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-08-25

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT...

  2. 76 FR 70953 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-11-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket ID PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Advance notice of...

  3. Natural disasters and the gas pipeline system.

    Science.gov (United States)

    1996-11-01

    Episodic descriptions are provided of the effects of the Loma Prieta earthquake (1989) on the gas pipeline systems of Pacific Gas & Electric Company and the Cit of Palo Alto and of the Northridge earthquake (1994) on Southern California Gas' pipeline...

  4. Outlook '98 - Gas and oil pipelines

    International Nuclear Information System (INIS)

    Curtis, B.

    1998-01-01

    Due to rising North American demand, especially by the United States, by the end of 1997 there were plans to build 15 new pipelines over the next three years, at an estimated cost of $17 billion. Canada''s proximity to the United States, combined with huge Canadian reserves, and the fact that Canada already supplies some 15 per cent of U.S. requirements, makes Canada the obvious choice for filling future demand. This explains why most, if not all, current pipeline expansion projects are targeting markets in the U.S. Market forces will determine which of the projects will actually go forward. From the point of view of the Canadian Energy Pipeline Association pipeline regulatory reform, pipeline safety, integrity and climate change will be the Association''s key concerns during 1998. To that end, the Association is cooperating with the National Energy Board in a multi-million dollar study of stress corrosion cracking. The Association has also developed a Manual of Recommended Practices for the use of member companies to assist them to tailor stress corrosion cracking practices to their own operations. Meeting Canada''s commitment at the Kyoto Conference for greenhouse gas emissions of six per cent below 1990 levels by the year 2008 to 2012 (in effect a 25 per cent reduction from the level anticipated in the year 2000), a very difficult task according to industry experts, is also among the high priority items on the pipeline industry''s agenda for 1998

  5. Research into the transmission of natural gas by gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Gadonneix, P.

    1998-12-31

    This paper is the press release of the talk given at the `Gaz de France scientific meeting with the press` by P. Gadonneix, chairman of Gaz de France company, on October 7, 1998. The aim of this talk concerns the new French and European supply link for bringing natural gas from the Norwegian North Sea fields. This new supply link is the first direct link between Norway and France and the NorFra gas pipeline which brings natural gas from the North Sea to France is the longest offshore pipeline in the world. The `Artere des Hauts de France` pipeline (the largest diameter gas pipeline ever laid in France) is devoted to the transfer of natural gas from Dunkerque to the Gournay-sur-Aronde underground storage site. This paper describes successively: the French European gas supply hub, the NorFra project, the Artere des Hauts de France pipeline, the network performance research, the safety and quality guaranties, the reduction of overland natural gas transmission costs (improvement of pipe-laying techniques and optimization of line route and welding operations), the specific techniques used for road and river crossing (micro-tunnel digging, river-crossing ditches) and for anchoring (buoyancy compensation). Finally, the environmental impact of the laying operations is briefly described. (J.S.)

  6. Pipeline system for gas centrifuge

    International Nuclear Information System (INIS)

    Masumoto, Tsutomu; Umezawa, Sadao.

    1977-01-01

    Purpose: To enable effective operation for the gas centrifuge cascade system upon failures in the system not by interrupting the operation of all of the centrifuges in the system but by excluding only the failed centrifuges. Constitution: A plurality of gas centrifuges are connected by way of a pipeline and an abnormal detector for the automatic detection of abnormality such as destruction in a vacuum barrel and loss of vacuum is provided to each of the centrifuges. Bypass lines for short-circuitting adjacent centrifuges are provided in the pipelines connecting the centrifuges. Upon generation of abnormality in a centrifuge, a valve disposed in the corresponding bypass is automatically closed or opened by a signal from the abnormal detector to change the gas flow to thereby exclude the centrifuge in abnormality out of the system. This enables to effectively operate the system without interrupting the operation for the entire system. (Moriyama, K.)

  7. 78 FR 70623 - Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory...

    Science.gov (United States)

    2013-11-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0203] Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory Committee AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. [[Page...

  8. Halifax Lateral Pipeline Project : comprehensive study report

    International Nuclear Information System (INIS)

    1998-12-01

    The National Energy Board has requested the preparation of a comprehensive study report (CSR) for the proposed Halifax Lateral Pipeline Project in support of Maritimes and Northeast Pipeline Company's proposal to construct the lateral pipeline to transport natural gas produced in offshore Nova Scotia to the Tufts Cove electric generating station in the Halifax Regional Municipality. The project will also enhance the access of natural gas to potential markets located along the pipeline route. This CSR was prepared according to guidelines of the Canadian Environmental Assessment Agency. The report presents: (1) an overview of the project, (2) a summary of the regulatory requirements for assessment, (3) a description of the environmental assessment and regulatory process to date, (4) a summary of the predicted residual environmental and socio-economic effects associated with the project, and (5) a summary of the public consultation process. The environmental and socio-economic assessment focused on these eleven issues: groundwater resources, surface water resources, wetlands, soils, air quality, fish habitat, rare herpetiles, mammals, avifauna, rare plants and archaeological heritage resources. The report identified potential interactions between the project and valued socio-economic and environmental components. These were addressed in combination with recommended mitigative measures to reduce potential adverse effects. It was concluded that the overall environmental effects from the proposed project are likely to be minimal and can be effectively managed with good environmental management methods. 14 refs., 5 tabs., 5 figs., 2 appendices

  9. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2013-02-06

    ... Director of the Office of Energy Projects. The cost limits for calendar year 2013, as published in Table I.... ACTION: Final rule. SUMMARY: Pursuant to the authority delegated by 18 CFR 375.308(x)(1), the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for...

  10. 77 FR 34123 - Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines

    Science.gov (United States)

    2012-06-08

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0100] Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines AGENCY: Office of Pipeline Safety, Pipeline and Hazardous Materials Safety Administration, DOT. ACTION...

  11. East, West German gas pipeline grids linked

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Ruhrgas AG, Essen, has started up the first large diameter gas pipeline linking the gas grids of former East and West Germany. Ruhrgas last month placed in service a 40 in., 70 km line at Vitzeroda, near Eisenach, linking a new Ruhrgas pipeline in Hesse state with a 330 km gas pipeline built last year in Thuringia and Saxony states by Erdgasversorgungs GmbH (EVG), Leipzig. The new link enables pipeline operator EVG to receive 70 bcf/year of western European gas via Ruhrgas, complementing the 35 bcf/year of gas coming from the Commonwealth of Independent States via Verbundnetz Gas AG (VNG), Leipzig

  12. Alaska gas pipeline and the global natural gas market

    International Nuclear Information System (INIS)

    Slutz, J.

    2006-01-01

    The global natural gas market was discussed in relation to the Alaska natural gas pipeline project. Natural gas supply forecasts to the year 2025 were presented. Details of the global liquefied natural gas (LNG) market were discussed. Charts were included for United States natural gas production, consumption, and net imports up to the year 2030. The impact of high natural gas prices on the manufacturing sector and the chemicals industry, agricultural, and ethanol industries were discussed. Natural gas costs around the world were also reviewed. The LNG global market was discussed. A chart of world gas reserves was presented, and global LNG facilities were outlined. Issues related to the globalization of the natural gas trade were discussed. Natural gas imports and exports in the global natural gas market were reviewed. A chart of historical annual United States annual LNG imports was presented. tabs., figs

  13. 75 FR 5244 - Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines; Correction

    Science.gov (United States)

    2010-02-02

    ... Management Program for Gas Distribution Pipelines; Correction AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Regulations to require operators of gas distribution pipelines to develop and implement integrity management...

  14. 77 FR 2126 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-01-13

    ... Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements.'' The final rule...

  15. Geology knowledge application in civil engineering realization: Gas Pipeline

    International Nuclear Information System (INIS)

    Techera, J.

    2001-01-01

    The Company manager for the building project of south gas pipeline contracted technical services to National Direction of Geology and Mining DINAMIGE for study the geology.It studied Colonia-Montevideo stretch s and then Colonia-Porto Alegre stretch s of gas pipeline.The main purpose was determine the physical and mechanics earthly characteristic for in a future to bury the gas pipe

  16. California Natural Gas Pipelines: A Brief Guide

    Energy Technology Data Exchange (ETDEWEB)

    Neuscamman, Stephanie [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Price, Don [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pezzola, Genny [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Glascoe, Lee [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-01-22

    The purpose of this document is to familiarize the reader with the general configuration and operation of the natural gas pipelines in California and to discuss potential LLNL contributions that would support the Partnership for the 21st Century collaboration. First, pipeline infrastructure will be reviewed. Then, recent pipeline events will be examined. Selected current pipeline industry research will be summarized. Finally, industry acronyms are listed for reference.

  17. Strength analysis of copper gas pipeline span

    OpenAIRE

    Ianevski, Philipp

    2016-01-01

    The purpose of the study was to analyze the stresses in a gas pipeline. While analyzing piping systems located inside building were used. Calculation of the strength of a gas pipeline is done by using information of the thickness of pipe walls, by choosing the suitable material, inner and outer diameter for the pipeline. Data for this thesis was collected through various internet sources and different books. From the study and research, the final results were reached and calculations were ...

  18. Black powder removal in a Mexico gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Morrow, John R. [TDW Services, Inc., New Castle, DE (United States); Drysdale, Colin; Warterfield, Bob D. [T.D.Williamson, Inc., Tulsa, OK (United States)

    2008-07-01

    This paper focuses on the cleaning methodology and operational constrains involved with the removal of black powder in a high pressure natural gas transmission pipeline. In this case, the accumulation of black powder along the pipeline system over the seven year period since it was put into service was creating significant problems in the areas of maintenance, customer relations, and cost to the pipeline operator due to clogging of filters, reduced gas flow, and penalties as result of non-compliant delivery contracts. The pipeline cleaning project consisted of running cleaning pigs or scrappers with batches of cleaning solution through each section of the pipeline while dealing with such factors as three (3) pipeline section lengths in excess of 160 kms (100 miles), gas flow velocity fluctuations, shutdowns, and gas delivery schedule requirements. The cleaning program for the entire pipeline system included the use of chemical and diesel based cleaning solution, running multiple cleaning pigs, liquid injection and separation system, mobile storage tanks, various equipment and personnel for logistical support. Upon completion of the cleaning program, the level of black powder and other solids in all pipeline sections was reduced to approximately 0.5% liquid/solid ratio and the pipeline system returned to normal optimum operation. (author.

  19. 78 FR 41496 - Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees

    Science.gov (United States)

    2013-07-10

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0156] Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of advisory committee...

  20. Alberta benefits : economic impacts of northern gas pipeline construction

    International Nuclear Information System (INIS)

    Rylska, N.L.; Graebeiel, J.E.; Mirus, R.K.; Janzen, S.S.; Frost, R.J.

    2003-11-01

    This paper describes the potential economic impact and benefits to Alberta from the proposed development of the Alaska Highway Pipeline (AHP) and the Mackenzie Valley Pipeline (MVP). It also includes a planning framework for business and industry in the province. Each proposed pipeline was evaluated separately. The paper includes a list of Alberta companies that stand to benefit from the construction of one or both pipelines. The main findings indicate that northern pipeline development will bring opportunities to Alberta business in design, construction and management. There will be a secondary impact on petrochemical industries and infrastructure. Both pipeline developments will increase employment and yield billions of dollars in gross domestic product. The existing oil and gas industry in Alberta will receive value-added opportunities in areas of specialized expertise such as natural gas and natural gas liquid storage, natural gas liquid processing, and gas to liquid technology projects. The industry will also benefit from power generation and cogeneration. The northern pipelines have the potential to improve the role of First Nations in economic development. Gas consumers in Alberta should benefit from a secure supply of gas and lower prices. refs., tabs., figs

  1. Black powder in gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Sherik, Abdelmounam [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-07-01

    Despite its common occurrence in the gas industry, black powder is a problem that is not well understood across the industry, in terms of its chemical and physical properties, source, formation, prevention or management of its impacts. In order to prevent or effectively manage the impacts of black powder, it is essential to have knowledge of its chemical and physical properties, formation mechanisms and sources. The present paper is divided into three parts. The first part of this paper is a synopsis of published literature. The second part reviews the recent laboratory and field work conducted at Saudi Aramco Research and Development Center to determine the compositions, properties, sources and formation mechanisms of black powder in gas transmission systems. Microhardness, nano-indentation, X-ray Diffraction (XRD), X-ray Fluorescence (XRF) and Scanning Electron Microscopy (SEM) techniques were used to analyze a large number of black powder samples collected from the field. Our findings showed that black powder is generated inside pipelines due to internal corrosion and that the composition of black powder is dependent on the composition of transported gas. The final part presents a summary and brief discussion of various black powder management methods. (author)

  2. Environmental assessment on PETROBRAS pipeline projects: case study of Cacimbas-Catu gas pipeline; Engenharia de avaliacao ambiental no processo de concepcao de projetos de dutos da PETROBRAS - estudo de caso do Gasoduto Cacimbas (ES) - Catu (BA)

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Wilson Jose de; Pereira, Junior, Edson R; Fonseca, Renata A. Almeida; Rocha, Marcelo de Andrade; Soares, Luis Felipe [PETROBRAS Engenharia, RJ (Brazil). Engenharia de Avaliacao Ambiental

    2005-07-01

    The environmental assessment process is one of the most important phases in the implementation of pipeline projects. For that reason, new technologies and work procedures are used to perform the environmental assessment of areas where pipeways will be implemented. Since the quality of environmental assessment studies influences the social acceptance of projects and, consequently, the time required to obtain the environmental permits, PETROBRAS (Engenharia/IETEG/ETEG/EAMB) applies advanced technological tools to acquire remote sensing data (conventional / digital aero-surveys and satellite images), as well as software for digital image processing and integration and spatial analysis of information. Information about the physical, biological and socioeconomic environments are further verified and complemented through field trips using helicopters. This process makes it possible to identify environmentally favorable corridors to develop guidelines for the implementation of the pipeline, assuring its environmental feasibility, and produces relevant data to support the Environmental Impact Assessment Study, the Environmental Impact Assessment Report and the Risk Analysis Study. As an example of the application of this methodology, this paper presents results of the assessment of the Cacimbas / Catu gas pipeline, which is currently being permitted and is planned to be implemented in areas of high environmental complexity. (author)

  3. Australia's changing natural gas and pipeline industry

    International Nuclear Information System (INIS)

    Kimber, M.J.

    1998-01-01

    The future is bright for continued development of Australia's natural gas pipeline infrastructure, as well as for privatization and private energy infrastructure growth. Gas demands are growing and the development of open access principles for all natural gas transmission and distribution pipelines heralds a much more market focused industry. Within the next few years gas-on-gas competition will apply to supply, pipelines, and retail marketing. No longer will operators be able to pass on high costs resulting from inefficiencies to their customers. This article describes the changing Australian gas industry, evaluates the drivers for change and looks at ways the industry is responding to new regulatory regimes and the development and use of new pipeline technology

  4. Investigation on potential SCC in gas transmission pipeline in China

    Energy Technology Data Exchange (ETDEWEB)

    Jian, S. [Petroleum Univ., Beijing (China); Zupei, Y.; Yunxin, M. [China Petroleum Pipeline Corp., Beijing (China). Science and Technology Center

    2004-07-01

    Stress corrosion cracking (SCC) is a common phenomenon that occurs on the outer surfaces of buried pipelines. This paper investigated aspects of SCC on 3 transmission pipelines on the West-East Gas Pipeline Project in China. The study was comprised of 3 different investigations: (1) an investigation of SCC cases on constructed pipelines; (2) an evaluation of SCC sensitivity of pipeline steels in typical soil environments; and (3) an analysis of soil environments and operation conditions of western pipelines. The study included a review of pipeline corrosion investigations, as well as an examination of pipeline failure cases. Investigative digs were conducted at 21 sites to test soil chemistries. Slow strain rate stress were conducted to evaluate SCC sensitivity of steel pipelines used in China. Potentiodynamic polarization tests were conducted to characterize the electrochemical behaviour of the X70 line pipe steel in different soil environments. Results of the study showed that the environmental conditions in many locations in China contributed to SCC in pipelines. SCC was observed on the surface of X70 steel pipe specimens in both marsh and saline environments. Seasonal temperature changes also contributed additional stress on pipelines. The movement of soil bodies in mountainous areas also contributed to stress and coating damage. It was concluded that proper cathodic protection can alleviate concentrations of local solutions under disbanded coatings. Overprotection of SCC will accelerate the growth of cracks and the degradation of coatings. Samples gathered from the solutions found under the disbanded coatings of pipelines will be used to form part of a reference database for predicting SCC in oil and gas pipelines in the future. 2 refs., 4 tabs., 5 figs.

  5. 77 FR 16471 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-03-21

    ... Registry of Pipeline and Liquefied Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... Register (75 FR 72878) titled: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting...

  6. Oil and Natural Gas Pipelines, North America, 2010, Platts

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Oil and Natural Gas Pipeline geospatial data layer contains gathering, interstate, and intrastate natural gas pipelines, crude and product oil pipelines, and...

  7. Gazprom looks for means to finance its gas pipelines

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Russian Gazprom natural gas company wants to solve its short range problems in order to develop its activities in Western Europe rapidly. The transportation capacities remain the main problem of Gazprom which is looking for new financing for the development and maintenance of its pipelines network. Several pipeline projects are under study but the occidental banks remain suspicious and wait for the settlement of internal lawsuits between Gazprom and the Russian state. Short paper. (J.S.)

  8. Technical consideration of Niigata-Sendai natural gas pipeline; Niigata Sendaikan tennen gas pipeline no seko to gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    Tsujimura, O.; Sugai, H.; Koizumi, H. [Kawasaki Steel Corp., Tokyo (Japan)

    1997-09-01

    The Niigata-Sendai natural gas pipeline was constructed in 1996 by Japan Petroleum Exploration Co. to transmit indigenous gas produced off Niigata Pref. and imported gas from Indonesia in the form of LNG to Tohoku Electric Power Co.`s Sendai Thermal Power Station. It is the second longest onshore pipeline in Japan extending 251km (nominal diameter: 20in.). Kawasaki Steel participated in the construction project from the preliminary investigation and planning stage, and constructed a 97km long section, which is approximately 39% of the total length. Various new techniques were applied to secure safety and reduce cost. This paper outlines the project and some of the representative techniques adopted for the project, such as field bends cold-worked on 11m long straight pipes, work management system for constructing long-distance pipelines, coordination for the test runs and verification of the designs. 3 refs., 12 figs., 5 tabs.

  9. Seismic vulnerability of natural gas pipelines

    International Nuclear Information System (INIS)

    Lanzano, Giovanni; Salzano, Ernesto; Santucci de Magistris, Filippo; Fabbrocino, Giovanni

    2013-01-01

    This work deals with the analysis of the interaction of earthquakes with pipelines transporting and distributing natural gas for industrial and civil use. To this aim, a new large data-set of seismic information classified on the basis of selected seismological, geotechnical and structural parameters is presented and analyzed. Particular attention is devoted to continuous pipelines under strong ground shaking, which is the geotechnical effect due to passage of waves in soil. Results are provided in terms of the likelihood of the loss of containment with respect to Peak Ground Velocity (PGV), a seismic intensity parameter which may be easily retrieved either from local authorities and public databases or from site dependent hazard analysis. Fragility functions and seismic intensity threshold values for the failure and for the loss of containment of gas from pipeline systems are also given. The obtained functions can be easily implemented in existing codes and guidelines for industrial risk assessment, land-use planning, and for the design of public distribution network, with specific reference to Natural—Technological interaction (Na-Tech). -- Highlights: • The seismic vulnerability of natural gas pipelines is analyzed. • A collection of data for pipelines damaged by earthquake is given. • Damage states and risk states for pipelines are defined. • Consequence-based fragility formulations for the loss of containment are given • Seismic threshold values for public authority, risk assessment and gas distribution are shown

  10. Environmental analysis for pipeline gas demonstration plants

    Energy Technology Data Exchange (ETDEWEB)

    Stinton, L.H.

    1978-09-01

    The Department of Energy (DOE) has implemented programs for encouraging the development and commercialization of coal-related technologies, which include coal gasification demonstration-scale activities. In support of commercialization activities the Environmental Analysis for Pipeline Gas Demonstration Plants has been prepared as a reference document to be used in evaluating potential environmental and socioeconomic effects from construction and operation of site- and process-specific projects. Effluents and associated impacts are identified for six coal gasification processes at three contrasting settings. In general, impacts from construction of a high-Btu gas demonstration plant are similar to those caused by the construction of any chemical plant of similar size. The operation of a high-Btu gas demonstration plant, however, has several unique aspects that differentiate it from other chemical plants. Offsite development (surface mining) and disposal of large quantities of waste solids constitute important sources of potential impact. In addition, air emissions require monitoring for trace metals, polycyclic aromatic hydrocarbons, phenols, and other emissions. Potential biological impacts from long-term exposure to these emissions are unknown, and additional research and data analysis may be necessary to determine such effects. Possible effects of pollutants on vegetation and human populations are discussed. The occurrence of chemical contaminants in liquid effluents and the bioaccumulation of these contaminants in aquatic organisms may lead to adverse ecological impact. Socioeconomic impacts are similar to those from a chemical plant of equivalent size and are summarized and contrasted for the three surrogate sites.

  11. Worldwide natural gas pipeline situation. Sekai no tennen gas pipeline jokyo

    Energy Technology Data Exchange (ETDEWEB)

    Arimoto, T [Osaka Gas Co. Ltd., Osaka (Japan)

    1993-03-01

    Constructing natural gas pipelines in wide areas requires investments of a huge amount. Many countries are building natural gas supply infrastructures under public support as nations' basic policy of promoting use of natural gas. This paper describes the present conditions of building pipelines in Western Europe, the U.S.A., Korea and Taiwan. In Western Europe, transporting companies established in line with the national policy own trunk pipelines and storage facilities, and import and distribute natural gas. The U.S.A. has 2300 small and large pipeline companies bearing transportation business. Pipelines extend about 1.9 million kilometers in total, with trunk pipelines accounting for about 440,000 kilometers. The companies are given eminent domain for the right of way. Korea has a plan to build a pipeline network with a distance of 1600 kilometers in around 2000. Taiwan has completed trunk pipelines extending 330 kilometers in two years. In Japan, the industry is preparing draft plans for wide area pipeline construction. 5 figs., 1 tab.

  12. Northwest Asia - gas market outlook: LNG vs. pipeline gas

    International Nuclear Information System (INIS)

    Keun Wook Paik

    1996-01-01

    The share of natural gas in Northeast Asia's energy mix is quite low despite that the region currently dominates the world LNG trade. In the long term, the region's rapid expansion of gas demand in the coming decades looks very likely, but the LNG dominance in the region's gas market will collapse in parallel with the introduction of a long distance pipeline gas. The most likely timing of pipeline gas introduction in Northeast Asian gas market seems to be during the second half of the next decade. (Author)

  13. Corrosion behavior of API 5L-X80 Pipeline steel for natural gas pipeline

    International Nuclear Information System (INIS)

    Mohd Asyadi Azam Mohd Abid; Imai, Hachiro

    2007-01-01

    Natural energy problem, including the environmental aspects had changes into certain circumstances in recent years and natural gas has been a focus of constant attention from the viewpoint of energy efficiency and pollution free. From that kind of background, pipeline construction for petroleum and natural gas were considerate as energy infrastructure maintenance plan. Based on the clarification of Asian Pipeline Project (1997-2007) centered in Japan, international pipeline is needed as the natural gas is mainly transported from gas field in Russia and Middle East to consumer country such as Japan etc. It used in severe condition such as cold district and sea. In the meantime, pipeline steel is not just received damages by earth crust fluctuation and corrosion, but also suffered from the corrosion caused by anions that were dissolved in sea and groundwater. The diversification of dispersion and consumption structure of natural gas supply acceptance base are seen regarding, that made the needs of the storing are rising and dealt with the quantitative spatial expansion of the demand. By that, corrosion resistance, not only the hardness, tough, weldability, corrosiveness gas environment is extremely required. (author)

  14. Midwest gas and power markets, hubs, pipelines, and interconnects

    International Nuclear Information System (INIS)

    Wirick, J.

    2001-01-01

    The existing interstate pipelines and proposed pipeline projects for the Chicago hub area were illustrated. The presentation explained why energy suppliers in the current competitive market need to balance and manage energy and transportation services for gas-fired power generators in terms of hourly winter and summer peaking services. The new infrastructure of the energy market will include new pipelines, storage and balancing to meet the ever increasing power demand. One of the options to meet power demand is to increase natural gas supply, transportation, storage, and hourly balancing capabilities. Other options are to build nuclear or coal-fired power generating facilities, or to go with renewables such as solar and wind power. Energy conservation and the reduction of natural gas usage per capita is another option to eliminate blackouts. This presentation also addressed the role that local distribution companies (LDC) and unbundling will play in the choice of these options. tabs., figs

  15. Integrating sustainable growth into export pipeline projects

    International Nuclear Information System (INIS)

    Jeniffer, Barringer; William, Lukens; Patricia, Wild

    2002-01-01

    Full text: Sustainable growth in the energy industry is rapidly expanding beyond the conceptual stage. Policies addressing the three principles of Sustainable Development are being established and strategies to execute these policies are being developed and implemented in the field. Conoco is developing a strong corporate culture around sustainable growth; and, pipeline systems play a vital role in delivering the triple bottom line results for our stake holders. This paper will highlight some of the key focal points by Conoco Inc., in each phase of pipeline project development, execution, and operation to make pipeline projects a contributor to Conoco's sustainable growth success, and shares some lessons learned

  16. Government Support for Synthetic Pipeline Gas Uncertain and Needs Attention.

    Science.gov (United States)

    1982-05-14

    coal gas. Tear Sheetii RECOMMENDATIONS GAO recommends that the Secretary of Energy - --establish a plan to guide future support of high-Btu coal...recognizes that there are basic dif- ferences expected from large and small scale research projects, GAO believes that the report recognizes these...transportation, including the pipeline system. In its price-setting, or ratemaking function, it represents the interests of gas customers, sometimes

  17. Gas supplies of interstate natural gas pipeline companies, 1991

    International Nuclear Information System (INIS)

    1992-01-01

    This publication provides information on the total reserves, production, and deliverability capabilities of the 64 interstate pipeline companies required to file the Federal Energy Regulatory Commission (FERC) Form 15, ''Interstate Pipeline's Annual Report of Gas Supply.'' Data reported on this form are not considered to be confidential. This publication is the 29th in a series of annual reports on the total gas supplies of interstate pipeline companies since the inception of individual company reports to the Federal Power Commission (FPC) in 1964 for report year 1963

  18. Software for natural gas pipeline design and simulation (gaspisim ...

    African Journals Online (AJOL)

    Software for natural gas pipeline design and simulation (gaspisim) ... This paper focuses on the development of software for optimum design and simulation of natural gas pipeline. General ... EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  19. The research of qualitative indicators of gas pipelines during the ...

    African Journals Online (AJOL)

    The research of qualitative indicators of gas pipelines during the operation. ... Journal of Fundamental and Applied Sciences ... The quality control study of the inter-settlement gas pipeline section was conducted, and graphs of dependence of ...

  20. Development Of A Centrifugal Hydrogen Pipeline Gas Compressor

    Energy Technology Data Exchange (ETDEWEB)

    Di Bella, Francis A. [Concepts NREC, White River Junction, VY (United States)

    2015-04-16

    Concepts NREC (CN) has completed a Department of Energy (DOE) sponsored project to analyze, design, and fabricate a pipeline capacity hydrogen compressor. The pipeline compressor is a critical component in the DOE strategy to provide sufficient quantities of hydrogen to support the expected shift in transportation fuels from liquid and natural gas to hydrogen. The hydrogen would be generated by renewable energy (solar, wind, and perhaps even tidal or ocean), and would be electrolyzed from water. The hydrogen would then be transported to the population centers in the U.S., where fuel-cell vehicles are expected to become popular and necessary to relieve dependency on fossil fuels. The specifications for the required pipeline hydrogen compressor indicates a need for a small package that is efficient, less costly, and more reliable than what is available in the form of a multi-cylinder, reciprocating (positive displacement) compressor for compressing hydrogen in the gas industry.

  1. Practical approach on gas pipeline compression system availability analysis

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Sidney Pereira dos [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Kurz, Rainer; Lubomirsky, Matvey [Solar Turbines, San Diego, CA (United States)

    2009-12-19

    Gas pipeline projects traditionally have been designed based on load factor and steady state flow. This approach exposes project sponsors to project sustainability risks due to potential losses of revenues and transportation contract penalties related to pipeline capacity shortage as consequence of compressor unit's unavailability. Such unavailability should previously be quantified during the design phase. This paper presents a case study and a methodology that highlights the practical benefits of applying Monte Carlo simulation for the compression system availability analysis in conjunction with quantitative risk analysis and economic feasibility study. Project economics main variables and their impacts on the project NPV (Net Present Value) are evaluated with their respective statistics distribution to quantify risk and support decision makers to adopt mitigating measures to guarantee competitiveness while protecting project sponsors from otherwise unpredictable risks. This practical approach is compared to load factor approach and the results are presented and evaluated. (author)

  2. Natural gas pipeline leaks across Washington, DC.

    Science.gov (United States)

    Jackson, Robert B; Down, Adrian; Phillips, Nathan G; Ackley, Robert C; Cook, Charles W; Plata, Desiree L; Zhao, Kaiguang

    2014-01-01

    Pipeline safety in the United States has increased in recent decades, but incidents involving natural gas pipelines still cause an average of 17 fatalities and $133 M in property damage annually. Natural gas leaks are also the largest anthropogenic source of the greenhouse gas methane (CH4) in the U.S. To reduce pipeline leakage and increase consumer safety, we deployed a Picarro G2301 Cavity Ring-Down Spectrometer in a car, mapping 5893 natural gas leaks (2.5 to 88.6 ppm CH4) across 1500 road miles of Washington, DC. The δ(13)C-isotopic signatures of the methane (-38.2‰ ± 3.9‰ s.d.) and ethane (-36.5 ± 1.1 s.d.) and the CH4:C2H6 ratios (25.5 ± 8.9 s.d.) closely matched the pipeline gas (-39.0‰ and -36.2‰ for methane and ethane; 19.0 for CH4/C2H6). Emissions from four street leaks ranged from 9200 to 38,200 L CH4 day(-1) each, comparable to natural gas used by 1.7 to 7.0 homes, respectively. At 19 tested locations, 12 potentially explosive (Grade 1) methane concentrations of 50,000 to 500,000 ppm were detected in manholes. Financial incentives and targeted programs among companies, public utility commissions, and scientists to reduce leaks and replace old cast-iron pipes will improve consumer safety and air quality, save money, and lower greenhouse gas emissions.

  3. The Eastring gas pipeline in the context of the Central and Eastern European gas supply challenge

    Science.gov (United States)

    Mišík, Matúš; Nosko, Andrej

    2017-11-01

    Ever since the 2009 natural gas crisis, energy security has been a crucial priority for countries of Central and Eastern Europe. Escalating in 2014, the conflict between Ukraine and Russia further fuelled negative expectations about the future development of energy relations for the region predominantly supplied by Russia. As a response to the planned cessation of gas transit through the Brotherhood pipeline, which brings Russian gas to Europe via Ukraine and Slovakia, the Slovak transmission system operator Eustream proposed the Eastring pipeline. This Perspective analyses this proposal and argues that neither the perceived decrease in Slovak energy security nor the loss of economic rent from the international gas transit should be the main policy driver behind such a major infrastructure project. Although marketed as an answer to current Central and Eastern European gas supply security challenges, the Eastring pipeline is actually mainly focused on issues connected to the Slovak gas transit.

  4. Upgrading Algeria-Italy trans-Mediterranean natural gas pipeline

    International Nuclear Information System (INIS)

    Stella, G.

    1992-01-01

    The first trans-Mediterranean pipeline system, which went into service in 1983, had to be doubled in capacity in order to meet increased European demand for Algerian natural gas. After a brief review of the contractual, planning and construction history of the first pipeline, this paper discusses the strategies taken which led to the decision to double the line's capacity. Descriptions are then given of the different construction phases realized in Tunisia, the Sicilian Channel and Italian mainland. Focus is on construction schedules, problems and solutions. The report comes complete with details of project financing, organizing, materials supply programs, innovative technology applications, design philosophy and construction techniques

  5. Internal sandblasting of gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Murray, A B

    1969-09-29

    Trans-Canada is completing the fourth season of internal cleaning by sandblasting of its multiple-line gas transmission system, with Kleen Kote, Inc., as contractor. Flow efficiencies of 93% have been attained and have been maintained for periods of more than 2 yr for all normally expected flow rates, compared with 83.8% previously at flow rates up to 1.2 billion cu ft per day. It was estimated that increased efficiency through sandblasting reduced line pipe requirements for 36-in. looping by 47 miles, saving $8.7 million capital expenditures. At 70 cents/ft or $3,700 a mile for sandblasting, the cost of sandblasting was only one-quarter that of looping.

  6. U.S. natural gas pipeline flow and demand trends

    International Nuclear Information System (INIS)

    Carson, M.M.

    1992-01-01

    It is no surprise that regional natural gas supply and demand patterns in North America are constantly changing. A consensus of forecasters agree that the natural gas resource base is larger than envisaged in the early 1980s due to advances in exploration and production technology. In addition, on the demand side more gas will be burned by US power generators to meet growth in electricity. Gas consumption is up in the commercial sector, and natural gas is correctly seen as environmentally protective. But how much more natural gas does the US need? This paper reports that new pipeline projects are springing up all over the nation --- 43 to be exact, with most of them connecting gas deliverability out of basins west of the Mississippi to new markets along the Atlantic and Pacific coasts

  7. Development and Applications of Pipeline Steel in Long-Distance Gas Pipeline of China

    Science.gov (United States)

    Chunyong, Huo; Yang, Li; Lingkang, Ji

    In past decades, with widely utilizing of Microalloying and Thermal Mechanical Control Processing (TMCP) technology, the good matching of strength, toughness, plasticity and weldability on pipeline steel has been reached so that oil and gas pipeline has been greatly developed in China to meet the demand of strong domestic consumption of energy. In this paper, development history of pipeline steel and gas pipeline in china is briefly reviewed. The microstructure characteristic and mechanical performance of pipeline steel used in some representative gas pipelines of china built in different stage are summarized. Through the analysis on the evolution of pipeline service environment, some prospective development trend of application of pipeline steel in China is also presented.

  8. Gas supplies of interstate natural gas pipeline companies 1990

    International Nuclear Information System (INIS)

    1992-01-01

    This publication provides information on the interstate pipeline companies' supply of natural gas in the United States during calendar year 1990, for use by the Federal Energy Regulatory Commission for regulatory purposes. It also provides information to other Government agencies, the natural gas industry, as well as policy makers, analysts, and consumers interested in current levels of interstate supplies of natural gas and trends over recent years

  9. Saint John lateral pipeline project: comprehensive study report

    International Nuclear Information System (INIS)

    1999-02-01

    A descripion is given of the results of an environmental impact assessment of the construction of a natural gas pipeline that will bring gas from Maritimes and Northeast Pipeline Management Ltd.'s (M and NP) main transmission pipeline to clients in Lake Utopia and Saint John, NB. It will be 110 km long, and the Saint John lateral will join the mainline approximately 2 km south of Big Kedron Lake, NB. Various institutional, industrial, commercial and residential clients will be able to access the pipeline in the future, and it is intended to be capable of future expansion for markets along its route and for markets that become economically feasible in the future. A matrix was developed that relates environmental resources to Environmental Components of Concern (ECCs), and to the rationale for exclusion/inclusion of the ECC as a Valued Environmental Component (VECs). The positive benefits of the pipeline to clients in the Saint John area include: reduced dependence on foreign oil, fuel switching and price competition, lower air emission pollution, increased energy efficiency, and a source of energy that is secure and reliable. VECs were selected based on: concerns of various stakeholders including the public, community groups, scientific parties, Aboriginal groups, government officials and agencies, relevant regulations; relevant literature; and past evaluation experiences, including future developments of the proposed study area. Further selection of the VECs required an examination of the issues picked out via scoping to determine the ways in which the overall project could affect the ECCs, and included construction, operation, decommissioning/abandonment, malfunctions and accidents of the pipeline. The phases of the project as they impacted residually and cumulatively on the VECs were evaluated, and impacts on Valued Socio-Economic Components (VSCs) were assessed also. The mitigation efforts taken will minimize the potential effects of the project on VECs and VSCs

  10. Natural Gas pipelines: economics of incremental capacity

    International Nuclear Information System (INIS)

    Kimber, M.

    2000-01-01

    A number of gas transmission pipeline systems in Australia exhibit capacity constraints, and yet there is little evidence of creative or innovative processes from either the service provides of the regulators which might provide a market-based response to these constraints. There is no provision in the Code in its current form to allow it to accommodate these processes. This aspect is one of many that require review to make the Code work. It is unlikely that the current members of the National Gas Pipeline Advisory Committee (NGPAC) or its advisers have sufficient understanding of the analysis of risk and the consequential commercial drivers to implement the necessary changes. As a result, the Code will increasingly lose touch with the commercial realities of the energy market and will continue to inhibit investment in new and expanded infrastructure where market risk is present. The recent report prepared for the Business Council of Australia indicates a need to re-vitalise the energy reform process. It is important for the Australian energy industry to provide leadership and advice to governments to continue the process of reform, and, in particular, to amend the Code to make it more relevant. These amendments must include a mechanism by which price signals can be generated to provide timely and effective information for existing service providers or new entrants to install incremental pipeline capacity

  11. Alaska-Canada Pipeline Project : getting it done

    Energy Technology Data Exchange (ETDEWEB)

    Brintnell, R. [Enbridge Pipelines Inc., Calgary, AB (Canada)

    2005-07-01

    Enbridge's unique qualifications for the proposed Alaska-Canada pipeline that will extend from Prudhoe Bay, Alaska to Fort Saskatchewan, Alberta was discussed. Enbridge is Canada's largest local distribution company (LDC), handling approximately 14 bcf of natural gas per day through pipeline, processing and marketing. It also operates the world's longest liquids pipeline, delivering more than 2 million barrels per day. The company also has 20 years of operational experience in perma frost regions. The key challenges facing the construction of the proposed new high pressure liquids rich pipeline were discussed with reference to market outlook; cost reduction; U.S. fiscal and regulatory issues; Alaska fiscal contract; and, Canadian regulatory efficiency. A successful project will mean a $15 billion capital expenditure in Canada, $16 billion in government revenues, 12,000 construction work years, and tens of thousands of new jobs. It will also improve Alberta's position as the key energy hub and will increase the utilization of the existing infrastructure. Canadian consumers will benefit from access to a new supply basin and a more secure source of clean-burning natural gas at a cost competitive price. In order to get the project completed, the following requirements must be met: regulatory regimes must be clear and predictable; land access must be ensured in a timely manner; access to skilled human resources, material and equipment must also be ensured to facilitate timely and efficient project implementation; and, the safe and environmentally sound operation of the pipelines must also be ensured. This paper highlighted Canadian regulatory options in terms of the National Energy Board Act, Canadian Environmental Assessment Act, the Yukon Environmental and Socio-Economic Assessment Act, and the Northern Pipeline Act. Enbridge's proposed straddle plant at Fort Saskatchewan was discussed along with inter-connecting pipeline options. Enbridge

  12. Risk and integrity management system for PETRONAS Gas Berhad's gas and liquid hydrocarbon pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Khalid, Tuan Hj. Ahmad Nadzri bin; Nasir, Osman; Napiah, Mohd Nazmi Mohd Ali [PETRONAS Gas Berhad, Johor (Malaysia); Choong, Evelyn

    2005-07-01

    PETRONAS Gas Berhad (PGB), Malaysia currently operates one of Southeast Asia's largest onshore pipeline systems comprising more than 2,500 km of large diameter high pressure gas and liquid transmission, supply and lateral pipelines. Recognizing the value of a risk based approach to pipeline integrity management program, in 2002 PGB implemented a customized and fully integrated Risk and Integrity Management System (RIMS) which included software modules for: data management; semi-quantitative risk assessment; risk control cost benefit analyses; defect assessment; corrosion growth modeling; and reporting. As part of this project, a benchmarking study performed jointly with the contractor, PGB's pipeline integrity programs were also compared with a broad group of international pipeline operators. This study compared the relative ranking position of PGB pre- and post implementation of RIMS. It demonstrated that implementation of RIMS places PGB in a select group of first quartile international pipeline operators, with respect to the implementation of pipeline integrity management best practice. This paper describes the functionalities of RIMS system and how it has benefited PGB, which have been realized to date from its implementation. (author)

  13. Facilitating major additions to gas pipeline capacity: innovative approaches to financing, contracting, and regulation

    International Nuclear Information System (INIS)

    Schlesinger, B.; George, R.

    1997-01-01

    The North American gas pipeline industry is in the process of changing from a highly regulated merchant business to a less-regulated, more competitive, transportation industry. This has changed the risk profiles of many companies. This study examined various innovative approaches to successfully financing major pipeline projects emphasizing pipeline capacity financing, contractual terms between shippers and pipelines, and regulatory developments. Besides suggesting options to enhance prospects for financing major pipeline expansion projects, the study also aimed at creating a better understanding of the regulatory market and commercial changes in the pipeline industry and their financing implications. The study also includes a review of the evolution in gas markets and a record of consultations with lenders, producers, marketers and users. Innovative financing, contracting and regulatory solutions are identified and assessed. 25 refs., 17 tabs., 16 figs

  14. Natural gas pipelines: emerging market challenges

    International Nuclear Information System (INIS)

    Smart, A.; Balfe, P

    2001-01-01

    The Australian gas industry has come a long way in recent years. Most of the formerly government owned gas transmission, distribution and retail businesses have been privatised; major utility companies have been fundamentally restructured; the convergence of energy markets has seen many companies stepping outside the boundaries of their traditional businesses; and national competition policy has led to profound changes in the regulatory landscape. Yet despite the magnitude of these changes, it is clear that the journey of competitive reform has a long way to go. The Australian Gas Association's Industry Development Strategy identifies the potential for gas to increase its share of Australia's primary energy market, from around 18 percent at present to 22 percent by 2005, and 28 percent by 2015. Our analysis, using ACIL's Eastern Australian Gas Model, clearly shows that in the absence of major new sources of gas, these challenging targets will not be met and, indeed, there will be an increasing supply shortfall. However, with the emergence of new competitive supply sources such as Papua New Guinea and the Timor Sea, our modelling suggests that most of this demand can be satisfied at prices which will maintain gas' competitiveness in energy markets. Such developments provide both opportunities and challenges for the industry. In particular, they will profoundly affect the owners and operators of transmission pipeline systems. (Authors)

  15. Gas pipeline Opon - Barrancabermeja. Consumption at low cost with environmental cleaning

    International Nuclear Information System (INIS)

    Carta Petrolera

    1997-01-01

    The gas pipeline Opon-Barrancabermeja, is part of a project to produce hydrocarbons in the Carare Region. For this line will be transported natural gas of the Opon Field, in Simitarra (Colombia). The benefits that it brings the presence of the gas pipeline for the community have to see from the same construction of the net, joined with diverse programs that link to communities of the influence areas, in aspects related with health, education, environmental reparation and agricultural diversification

  16. 75 FR 66046 - Capacity Transfers on Intrastate Natural Gas Pipelines

    Science.gov (United States)

    2010-10-27

    ...] Capacity Transfers on Intrastate Natural Gas Pipelines October 21, 2010. AGENCY: Federal Energy Regulatory... comments on whether and how holders of firm capacity on intrastate natural gas pipelines providing interstate transportation and storage services under section 311 of the Natural Gas Policy Act of 1978 and...

  17. PIPELINE CORROSION CONTROL IN OIL AND GAS INDUSTRY: A ...

    African Journals Online (AJOL)

    Corrosion in pipelines is one of the major challenges faced by oil and gas industries all over the world. This has made corrosion control or management a major factor to consider before setting up any industry that will transport products via pipelines. In this study the types of corrosion found on system 2A pipeline were; ...

  18. 77 FR 22387 - Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering...

    Science.gov (United States)

    2012-04-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0024] Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering Pipeline Systems Annual Report, Gas Transmission and Gathering Pipeline Systems Incident Report...

  19. 78 FR 65427 - Pipeline Safety: Reminder of Requirements for Liquefied Petroleum Gas and Utility Liquefied...

    Science.gov (United States)

    2013-10-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0097] Pipeline Safety: Reminder of Requirements for Liquefied Petroleum Gas and Utility Liquefied Petroleum Gas Pipeline Systems AGENCY: Pipeline and Hazardous Materials Safety Administration...

  20. 77 FR 58616 - Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering...

    Science.gov (United States)

    2012-09-21

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0024] Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering Pipeline Systems Annual Report, Gas Transmission and Gathering Pipeline Systems Incident Report...

  1. Dauphin Island natural gas project

    International Nuclear Information System (INIS)

    Layfield, R.P.; Elser, K.L.; Ostler, R.H.

    1994-01-01

    Arco Oil and Gas Co. installed the Dauphin Island production facility in a fragile Alabama marine environment supporting important fisheries and tourist facilities. The authors used proactive communication with governmental agencies, area industry, and the public; innovative construction technologies; and unique platform design to minimize the environmental and aesthetic impacts and to develop an economically successful gas field. The innovative equipment used in the offshore pipeline installation is a model approach for solving certain turbidity problems. The project has received numerous environmental awards

  2. Dauphin Island natural gas project

    Energy Technology Data Exchange (ETDEWEB)

    Layfield, R.P. (Arco International Oil and Gas Co., Plano, TX (United States)); Elser, K.L.; Ostler, R.H. (Arco Oil and Gas Co., Houston, TX (United States))

    1994-01-01

    Arco Oil and Gas Co. installed the Dauphin Island production facility in a fragile Alabama marine environment supporting important fisheries and tourist facilities. The authors used proactive communication with governmental agencies, area industry, and the public; innovative construction technologies; and unique platform design to minimize the environmental and aesthetic impacts and to develop an economically successful gas field. The innovative equipment used in the offshore pipeline installation is a model approach for solving certain turbidity problems. The project has received numerous environmental awards.

  3. Managing changes of location classes of gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Cunha, Sergio B; Sousa, Antonio Geraldo de [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Most of the gas pipeline design codes utilize a class location system, where the design safety factor and the hydrostatic test factor are determined according to the population density in the vicinities of the pipeline route. Consequently, if an operator is requested or desires to maintain an existing gas pipeline in compliance with its design code, it will reduce the operational pressure or replace pipe sections to increase the wall thickness whenever a change in location class takes place. This article introduces an alternative methodology to deal with changes in location classes of gas pipelines. Initially, selected codes that utilize location class systems are reviewed. Afterwards, a model for the area affected by an ignition following a natural gas pipeline leak is described. Finally, a methodology to determine the MAOP and third part damage mitigation measures for gas transport pipelines that underwent changes in location class is presented. (author)

  4. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1998-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  5. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J. [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1997-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  6. Quantitative risk analysis preoperational of gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Manfredi, Carlos; Bispo, Gustavo G.; Esteves, Alvaro [Gie S.A., Buenos Aires (Argentina)

    2009-07-01

    The purpose of this analysis is to predict how it can be affected the individual risk and the public's general security due to the operation of a gas pipeline. In case that the single or social risks are considered intolerable, compared with the international standards, to be recommended measures of mitigation of the risk associated to the operation until levels that can be considered compatible with the best practices in the industry. The quantitative risk analysis calculates the probability of occurrence of an event based on the frequency of occurrence of the same one and it requires a complex mathematical treatment. The present work has as objective to develop a calculation methodology based on the previously mentioned publication. This calculation methodology is centered in defining the frequencies of occurrence of events, according to representative database of each case in study. Besides, it settles down the consequences particularly according to the considerations of each area and the different possibilities of interferences with the gas pipeline in study. For each one of the interferences a typical curve of ignition probabilities is developed in function from the distance to the pipe. (author)

  7. State observers for monitoring gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, M.J.; Jones, R.P.; Pritchard, A.J.

    1987-03-01

    This paper describes work performed on collaboration with the British Gas Corporation in relation to the development of algorithms for monitoring the condition of high-pressure gas pipelines. The practical problem considered is that of reconstructing the pressure profile along a single length of pipe from pressure measurements at the end points and a further measurement at an intermediate point along the pipe. The approach adopted is based on the implementation of a finite-dimensional asymptotic state observer derived from consideration of the distributed-parameter properties of the system. The paper includes the results of a computational study in which the observer was evaluated against experimental data corresponding to an 80 km section of pipe. These results indicate that the dynamic observer is capable of providing an accurate estimate of the pressure profile over a complete 24 h demand cycle. 5 refs. (authors).

  8. The importance of environmental communications in gas pipeline projects; A importancia da pre-comunicacao ambiental no licenciamento, implantacao e operacao de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Figueiredo, Marcia Bartolini; Sarno, Ruy Alberto Campos [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The Environmental Pre-Communication is a tool developed to identify the profiles of communities surrounding the marked area (lifestyle, resources, fragilities, beliefs, culture and wishes), how they make their living, and production (community dependence relationship with ecosystems, such as rivers and subsistence areas), social organization, needs and expectations. Besides developing a social economic diagnostic, pre-communication prepares a community perception study. Regarding gas pipelines, the area of study comprehends 200 m towards each side of gas pipeline right-of-way in rural areas and 400 m towards each side in urban areas. Pre-Communication diagnostic, which is included in the process of environmental licensing, is aimed at subsidizing EIS (Environmental Impact Statement), providing data which help to elaborate mitigating and compensatory plans and programs. Moreover, diagnostic information make it possible to run public forums before Public Hearings take place, aiming at clarifying specific community issues related to construction and reduction of resistances, avoiding problems and conflicts. Also, during the entrepreneurship implementation phase, there is the advantage to know the bordering community and its daily activities, increasing the effectiveness of Environmental Programs. (author)

  9. 78 FR 28837 - Acadian Gas Pipeline System; Notice of Petition

    Science.gov (United States)

    2013-05-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR11-129-001] Acadian Gas Pipeline System; Notice of Petition Take notice that on May 6, 2013, Acadian Gas Pipeline System (Acadian... concerns filed in the September 26, 2011 filing, as more fully detailed in the petition. Any person...

  10. software for natural gas pipeline design and simulation

    African Journals Online (AJOL)

    Global Journal

    2017-01-17

    Jan 17, 2017 ... investment and operating cost required for natural gas pipeline transmission ... In the early development of the natural gas transmission industry, pressures were low and ..... The software has an error control capability in.

  11. Safety of the medical gas pipeline system

    Directory of Open Access Journals (Sweden)

    Sushmita Sarangi

    2018-01-01

    Full Text Available Medical gases are nowadays being used for a number of diverse clinical applications and its piped delivery is a landmark achievement in the field of patient care. Patient safety is of paramount importance in the design, installation, commissioning, and operation of medical gas pipeline systems (MGPS. The system has to be operational round the clock, with practically zero downtime and its failure can be fatal if not restored at the earliest. There is a lack of awareness among the clinicians regarding the medico-legal aspect involved with the MGPS. It is a highly technical field; hence, an in-depth knowledge is a must to ensure safety with the system.

  12. GASDUC-3: a gas pipeline with neutralization of greenhouse gases

    Energy Technology Data Exchange (ETDEWEB)

    D' Oliveira, Celso A.; Paula, Eliane H. de; Freire, Dilian A.D. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    PETROBRAS seeks to develop its projects following the contemporary premises of sustainable development. The Cabiunas-REDUC-3 Gas Pipeline (GASDUC-3), an undertaking from the Transportadora Associada de Gas - TAG (Associated Gas Transporter) in progress by PETROBRAS, is an example showing that interfacing with the environment can overcome legal questions to reach the realm of awareness and community spirit. In addition to the many programs directed specifically towards the fulfillment of environmental regulations, as defined by competent agencies, the GASDUC-3 is also inserted in the Carbon Free Program. In the Carbon Free Program, all the GHG emissions into the atmosphere during the construction of the gas pipeline will be compensated for with the neutralization of carbon through reforestation. Such initiative is considered unheard of in works with pipelines worldwide. An inventory that quantified the emission of GHG during the implementation of GASDUC-3 made it possible to quantify the reforestation to be implemented and to calculate the number of native species to be planted for absorption - during the course of their growth - of this same amount of carbon dioxide from the atmosphere. The trees are being planted especially in Permanent Preservation Areas (PPA), located in the Unidades de Conservacao do Bioma Mata Atlantica (Conservation Units of the Atlantic Forest Biome), inside the influence region of the gas pipeline, in accordance with the competent environmental agencies and owners. In this way, in addition to fixing carbon and contributing to the deceleration of global warming, the project also cooperates with the preservation of hydro and soil resources and the local and regional biodiversity. The recapturing of the already emitted GHG through reforestation faces bureaucratic and economic difficulties in order to be implemented, different from the emission reduction projects which are widely disseminated by means of Clean Development Mechanisms (CDM

  13. Should the Nabucco pipeline project be shelved?

    International Nuclear Information System (INIS)

    Barysch, K.

    2010-05-01

    It is easy to be pessimistic about the prospects of Nabucco, a pipeline designed to bring Caspian and possibly Middle Eastern gas to the EU. The financing is not yet secure, European gas demand is down, and the question of where Nabucco's gas will come from is open. Russia, meanwhile, is pushing hard for its rival South Stream pipeline. Nabucco would be good for the EU in various ways. It would make Central and East European countries a lot less dependent on Gazprom and increase the energy security of the EU as a whole. It could help reduce intra-EU divisions over Russia. It would underpin stronger ties between the EU and potential supplier countries such as Azerbaijan and Turkmenistan. It could help improve EU-Turkey relations. Many of the benefits that Nabucco would bring do not accrue to the companies that are trying to build it or the banks that lend the money for it. Therefore, the EU and its governments should back Nabucco more strongly, both politically and financially.

  14. The southern corridor for natural gas and the last days of Nabucco. Transport of natural gas and Nabucco pipeline; Der suedliche Gaskorridor und die letzten Tage von Nabucco. Gastransport und Nabucco-Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Mangott, Gerhard [Innsbruck Univ. (Austria). Fakultaet fuer Politikwissenschaft und Soziologie

    2012-11-12

    As a strategic project management with a transport capacity of 31 billion m{sup 3} per year of natural gas, Nabucco 1.0 should diversify the natural gas suppliers for the EU market and the import pipeline network. Significant amounts of natural gas should be imported from the Caspian and the Middle East region. Nabucco 1.0 failed as a project management. The Nabucco consortium wants to convey natural gas through a small-scale and cheaper Nabucco west pipeline via Bulgaria, Romania and Hungary to Austria. Also the Trans-Adriatic Pipeline will transport the same natural gas reserves into the European Union (EU).

  15. Natural gas transport with the aid of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Volk, A

    1978-01-01

    After giving a brief explanation on the term natural gas and the chemical composition of natural gases of different origin, the natural gas supply in the FRG and in Western Europe is discussed. Other discussions are included on: (1) planning, construction, and operation of the pipelines; (2) the equipment for pressure increase and the telecommunication equipment which are urgently necessary for gas transport through pipelines; (3) the problem of safety both in connection with the supply and protection of man and material; and (4) problems of profitability of natural gas transport through pipelines.

  16. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    Science.gov (United States)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average

  17. Deployment Algorithms of Wireless Sensor Networks for Near-surface Underground Oil and Gas Pipeline Monitoring

    Directory of Open Access Journals (Sweden)

    Hua-Ping YU

    2014-07-01

    Full Text Available Oil and gas pipelines are the infrastructure of national economic development. Deployment problem of wireless underground sensor networks (WUSN for oil and gas pipeline systems is a fundamental problem. This paper firstly analyzed the wireless channel characteristics and energy consumption model in near-surface underground soil, and then studied the spatial structure of oil and gas pipelines and introduced the three-layer system structure of WUSN for oil and gas pipelines monitoring. Secondly, the optimal deployment strategy in XY plane and XZ plane which were projected from three-dimensional oil and gas pipeline structure was analyzed. Thirdly, the technical framework of using kinetic energy of the fluid in pipelines to recharge sensor nodes and partition strategy for energy consumption balance based on the wireless communication technology of magnetic induction waveguide were proposed, which can effectively improve the energy performance and connectivity of the network, and provide theoretical guidance and practical basis for the monitoring of long oil and gas pipeline network, the city tap water pipe network and sewage pipe network.

  18. Energy geopolitics and Iran-Pakistan-India gas pipeline

    International Nuclear Information System (INIS)

    Verma, Shiv Kumar

    2007-01-01

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this pipeline for India

  19. Energy geopolitics and Iran-Pakistan-India gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Verma, Shiv Kumar [Political Geography Division, Center for International Politics, Organization and Disarmament, School of International Studies, Jawaharlal Nehru University, New Delhi 110067 (India)

    2007-06-15

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this pipeline for India

  20. Natural gas markets and the creation of an export gas pipeline system in Eastern Russia

    International Nuclear Information System (INIS)

    Saneev, B.G.; Sokolov, A.D.; Popov, S.P.

    2003-01-01

    The world natural gas markets are analysed, with a special focus on the countries of Northeast Asia (NEA). The natural gas demands of China, Japan and South Korea, until the year 2020, is projected, considering a possible share of Russian gas. The resource potential of natural gas from the Siberian platform and the Sakhalin shelf is given as a sound basis for fuelling Russia's position in the natural gas market of NEA countries. Development of the powerful gas industry in the East of Russia faces some particular conditions that can decrease the effectiveness of investments. The eastern geopolitical direction is very important for Russia and the necessity to create a favourable political and economic environment for oil and gas export is of prime interest, as stressed in Energy Strategy for Russia till the Year 2020. In this context, the long-term market for natural gas in East Siberia and the Far East of Russia is investigated. Possible routes of natural gas export from Russia to NEA countries include three main directions: to the west of China with connection to the 'West-East gas pipeline', a route through and/or round Mongolia and, finally, a route along the Trans-Siberian or Baikal-Amur railroads to Russian ports in the Far East. As a result of complex studies, three stages in the creation of the unified gas pipeline system are suggested. Evaluation of the investments required for construction of such a natural gas pipeline system, expected gas volumes and prices on the markets show its high economic efficiency. In conclusion, the most valuable ideas are stressed. (author)

  1. Numerical modeling of fires on gas pipelines

    International Nuclear Information System (INIS)

    Zhao Yang; Jianbo Lai; Lu Liu

    2011-01-01

    When natural gas is released through a hole on a high-pressure pipeline, it disperses in the atmosphere as a jet. A jet fire will occur when the leaked gas meets an ignition source. To estimate the dangerous area, the shape and size of the fire must be known. The evolution of the jet fire in air is predicted by using a finite-volume procedure to solve the flow equations. The model is three-dimensional, elliptic and calculated by using a compressibility corrected version of the k - ξ turbulence model, and also includes a probability density function/laminar flamelet model of turbulent non-premixed combustion process. Radiation heat transfer is described using an adaptive version of the discrete transfer method. The model is compared with the experiments about a horizontal jet fire in a wind tunnel in the literature with success. The influence of wind and jet velocity on the fire shape has been investigated. And a correlation based on numerical results for predicting the stoichiometric flame length is proposed. - Research highlights: → We developed a model to predict the evolution of turbulent jet diffusion flames. → Measurements of temperature distributions match well with the numerical predictions. → A correlation has been proposed to predict the stoichiometric flame length. → Buoyancy effects are higher in the numerical results. → The radiative heat loss is bigger in the experimental results.

  2. Simulation of high consequence areas for gas pipelines

    OpenAIRE

    Orlando Díaz-Parra; Enrique Vera-López

    2018-01-01

    The gas pipeline is used for the transport of natural gas at a great distance. Risks derived from the handling of a combustible material transported under high pressure, by pipelines that pass close to where people live, makes it necessary to adopt prevention, mitigation and control measures to reduce the effect in case of ignition of a gas leak. This work shows the development of a new mathematical model to determine areas of high consequence and their application, using widely available and...

  3. Technology assessment of long distance liquid natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    1977-02-01

    This document contains phases 7, 8, and 9 of a review on the technology assessment of long distance liquefied natural gas (LNG) pipelines. Phase 7 contains 6 papers describing novel applications for LNG pipelines. Phase 8 contains a summary of material relating to cold utilization and rural service. Phase 9 presents a listing of materials and equipment used to construct an LNG pipeline. Separate abstracts for each phase of the study have been prepared for inclusion in the Energy Data Base. (DMC)

  4. Saving gas project

    Energy Technology Data Exchange (ETDEWEB)

    Vasques, Maria Anunciacao S. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Garantizado, Maria Auxiliadora G. [CONCREMAT Engenharia, Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The work presented was implemented in municipalities around the construction of the pipeline project Urucu-Coari-Manaus, the Engineering / IETEG-IENOR, because of the constant release of workers, consequently the finishing stages of this work and its future completion. The Project aims to guide saving gas with the workforce, their families and communities to the enterprise of small business cooperatives and solidarity within the potential of the site. This project is developed through the workshops: entrepreneur ship, tourism, use, reuse and recycling of products, and hortifruiti culture, agroecology, agribusiness (cooperativism solidarity) and forestry. Its execution took place in two phases, the first called 'pilot' of 12/12/2007 to 27/03/2008 in sections A and B1, in the municipality of Coari stretch and B2 in Caapiranga. The second phase occurred from 30/06 to 27/09/08, in the words B1, in the municipalities of Codajas and Anori words and B2 in Iranduba, Manacapuru and Anama. The workshops were held in state and municipal schools and administered by the Institute of Social and Environmental Amazon - ISAM, which had a team of coordinators, teachers, experts and masters of the time until the nineteen twenty-two hours to implement the project. (author)

  5. Risk Analysis using Corrosion Rate Parameter on Gas Transmission Pipeline

    Science.gov (United States)

    Sasikirono, B.; Kim, S. J.; Haryadi, G. D.; Huda, A.

    2017-05-01

    In the oil and gas industry, the pipeline is a major component in the transmission and distribution process of oil and gas. Oil and gas distribution process sometimes performed past the pipeline across the various types of environmental conditions. Therefore, in the transmission and distribution process of oil and gas, a pipeline should operate safely so that it does not harm the surrounding environment. Corrosion is still a major cause of failure in some components of the equipment in a production facility. In pipeline systems, corrosion can cause failures in the wall and damage to the pipeline. Therefore it takes care and periodic inspections or checks on the pipeline system. Every production facility in an industry has a level of risk for damage which is a result of the opportunities and consequences of damage caused. The purpose of this research is to analyze the level of risk of 20-inch Natural Gas Transmission Pipeline using Risk-based inspection semi-quantitative based on API 581 associated with the likelihood of failure and the consequences of the failure of a component of the equipment. Then the result is used to determine the next inspection plans. Nine pipeline components were observed, such as a straight pipes inlet, connection tee, and straight pipes outlet. The risk assessment level of the nine pipeline’s components is presented in a risk matrix. The risk level of components is examined at medium risk levels. The failure mechanism that is used in this research is the mechanism of thinning. Based on the results of corrosion rate calculation, remaining pipeline components age can be obtained, so the remaining lifetime of pipeline components are known. The calculation of remaining lifetime obtained and the results vary for each component. Next step is planning the inspection of pipeline components by NDT external methods.

  6. Methodology for environmental audit of execution in gas-pipelines and pipelines

    International Nuclear Information System (INIS)

    Hurtado Palomino, Maria Patricia; Vargas Bejarano, Carlos Hernando

    1999-01-01

    In first instance the constructive aspects and the environmental impact related with the gas-pipes and pipelines construction are presented; then a methodology to make the environmental audit of execution in gas-pipes and pipelines, is showed. They contemplate four stages basically: planning, pre-auditory, execution and analysis, and post-auditory with their respective activities. Also, it is given to know, generalities of the practical case, to evaluate the applicability of the proposed methodology

  7. Detection blockages and valve statues in natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Dawson, Karl; Short, Gordon; Wang, Xuesong [Pipeline Engineering Ltd, North Yorkshire, (United Kingdom); Lennox, Barry; Lewis, Keith; Turner, John [University of Manchester, Manchester, (United Kingdom); Lewis, Chris [BP exploration, Aberdeen, (United Kingdom)

    2010-07-01

    Detecting features in pipelines containing flowing gas is difficult. This paper investigated a patented acoustic reflectometry technique for detecting defects in gas pipelines. The basic concept of this technique is to inject a pulse of sound into a pipeline and then measure the reflections produced while the signal travels along the length of the pipe. A modification in the internal section of the pipe will produce a reflection which, given with the speed of sound in the gas within the pipeline, provides the location of the feature. Laboratory tests on a 16m rigid PVC pipe and two field trials were undertaken to test this new method. The results showed that acoustic reflectometry can be used to identify features resulting from blockages and leakages. The field tests demonstrated that the method is capable of surveying both small and large diameter pipelines with lengths up to 10 km.

  8. Integrity management of Brazil-Bolivia gas pipeline to reduce risks due third party damage

    Energy Technology Data Exchange (ETDEWEB)

    Vasconcellos, Carlos Renato Aragonez de; Monte, Oswaldo [PETROBRAS, Rio de Janeiro, RJ (Brazil); Colen, Eustaquio; Cunha, Roberto de Souza; Oliveira, Hudson Regis de [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil); Lima, Rogerio de Souza [RSL Consultoria Geoprojetos (Brazil); Schultz Neto, Walter [Milton Braga Assessoria Tecnica (Brazil)

    2005-07-01

    The Bolivia-Brazil Natural Gas Pipeline has 2.600 kilometers from Rio Grande City in Bolivia to Canoas City, in the south of Brazil. The right-of-way crosses a lot of types of topography and areas subjected to various kinds of anthropological actions, like areas in class locations 3, locals under agricultural activities, forests and minerals explorations, and near constructions of highway and railway, industrial constructions, new pipelines in the same right-of -way, channels, dams, that requires special projects to avoid that the gas pipeline could be subject to strengths that were not consider in the original design. The aim of this paper is to present the jobs developed by TBG during seven years of gas pipeline operations, as public awareness program, procedures to design, construct and inspect specials constructions along and near the right-of -way, control of mineral and forest explorations, monitoring and controlling of excavations on the right-of-way to install new pipelines and optical cables, to reduce risks of gas pipeline damage due third party, as a component of TBG' Managing Integrity Gas Pipeline Program. (author)

  9. Risk from transport of gas by pipeline ''kokui-perm''

    International Nuclear Information System (INIS)

    Yelokhin, A.

    1998-01-01

    Full text of publication follows: the length of gas pipelines in Russia is 142 thousands km, 62 % are pipelines of the large diameters. Annually on gas pipelines in Russia there are more than 70 large accidents, more than 50 % from them is accompanied by ignition of gas. The average ecological looses from accident is: destruction arable lands - 78 hectares; removing from consumption agricultural soils - 6,2 hectares; destruction forests - 47,5 hectares. In work the reasons of accidents on gas pipelines of different diameters are analyzed. So, for pipelines a diameter of 1220 mm by the reasons of accidents are: marriage of civil and erection works - 39, 1 %; outside corrosion - 35,9 %; mechanical damages - 9,4 %; defects of pipes - 6,2 %; defects of the factory equipment - 1,6 %; nature disasters and other reasons - 7,8 %. In work the results of risk analysis on a gas pipeline 'Kokui - Perm' are analysed. The gas pipeline 'Kokui - Perm' passes near 22 towns and countries, crosses 15 highways, 2 rail ways, 15 rivers. In work the concrete recommendations for management of risk and safety of the population are given. (author)

  10. Simulation of high consequence areas for gas pipelines

    Directory of Open Access Journals (Sweden)

    Orlando Díaz-Parra

    2018-01-01

    Full Text Available The gas pipeline is used for the transport of natural gas at a great distance. Risks derived from the handling of a combustible material transported under high pressure, by pipelines that pass close to where people live, makes it necessary to adopt prevention, mitigation and control measures to reduce the effect in case of ignition of a gas leak. This work shows the development of a new mathematical model to determine areas of high consequence and their application, using widely available and easy to use software, such as Google Earth and Excel, to determine and visualize the area up to which the level of radiation can affect the integrity of people and buildings. The model takes into account the pressure drop into the gas pipeline from the compression station, the gas leakage rate and possible forms of gas ignition. This development is an alternative to the use of specialized software and highly trained personnel. The simulation is applied to a traced of the Miraflores-Tunja gas pipeline, using a macro developed in Excel to determine the impact area and compare it with the coordinates of the vulnerable areas. The zones where these areas intersect are constituted in high consequence areas and are identified along with the sections of the pipeline that affect them, to provide the operator with a risk analysis tool for the determination and visualization of the gas pipeline and its environment.

  11. 78 FR 53190 - Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on...

    Science.gov (United States)

    2013-08-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0185] Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on Leak Repair Clamps Due to Defective Seal AGENCY: Pipeline and Hazardous Materials Safety...

  12. 78 FR 42889 - Pipeline Safety: Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems

    Science.gov (United States)

    2013-07-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2013-0097] Pipeline Safety: Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION...

  13. Study on Resources Assessment of Coal Seams covered by Long-Distance Oil & Gas Pipelines

    Science.gov (United States)

    Han, Bing; Fu, Qiang; Pan, Wei; Hou, Hanfang

    2018-01-01

    The assessment of mineral resources covered by construction projects plays an important role in reducing the overlaying of important mineral resources and ensuring the smooth implementation of construction projects. To take a planned long-distance gas pipeline as an example, the assessment method and principles for coal resources covered by linear projects are introduced. The areas covered by multiple coal seams are determined according to the linear projection method, and the resources covered by pipelines directly and indirectly are estimated by using area segmentation method on the basis of original blocks. The research results can provide references for route optimization of projects and compensation for mining right..

  14. PIPELINE CORROSION CONTROL IN OIL AND GAS INDUSTRY: A ...

    African Journals Online (AJOL)

    user

    protection technique as a method of controlling corrosion in oil and gas pipelines is effective and efficient when compared to ... In the field of crude oil production and associated engineering .... Industrial/Mechanical Systems, Joen Printing and.

  15. Feasibility study on rehabilitation and optimization of gas pipeline network/system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a survey was conducted on repairs and optimization of gas pipeline net/system in Bangladesh. In the survey, the measurement of methane gas concentration, wind direction/velocity and temperature was made for 16 stations of BC pipeline and BD pipeline including Ring Line. As a result of the measurement, the amount of methane leakage totaled 5,300 tons/year including 1,300 tons in BD pipeline, 2,500 tons in BC pipeline and 1,500 tons in Ring Line. For repairs/optimization of the pipeline net/system, the necessity of the following was pointed out: exchanges of gaskets, piping and valves; repairs of portions of the pipeline exposure; exchanges of pressure control valves and flowmeters; repair of the corrosion prevention system. In this improvement project, the reduction amount of greenhouse effect gas emissions will be 5,300 tons/year and approximately 106,000 tons in 20 years. The conservation will amount to 0.66 MMUS$/year. (NEDO)

  16. Virtual Instrumentation Corrosion Controller for Natural Gas Pipelines

    Science.gov (United States)

    Gopalakrishnan, J.; Agnihotri, G.; Deshpande, D. M.

    2012-12-01

    Corrosion is an electrochemical process. Corrosion in natural gas (methane) pipelines leads to leakages. Corrosion occurs when anode and cathode are connected through electrolyte. Rate of corrosion in metallic pipeline can be controlled by impressing current to it and thereby making it to act as cathode of corrosion cell. Technologically advanced and energy efficient corrosion controller is required to protect natural gas pipelines. Proposed virtual instrumentation (VI) based corrosion controller precisely controls the external corrosion in underground metallic pipelines, enhances its life and ensures safety. Designing and development of proportional-integral-differential (PID) corrosion controller using VI (LabVIEW) is carried out. When the designed controller is deployed at field, it maintains the pipe to soil potential (PSP) within safe operating limit and not entering into over/under protection zone. Horizontal deployment of this technique can be done to protect all metallic structure, oil pipelines, which need corrosion protection.

  17. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  18. Natural gas purchasing for cogeneration projects

    International Nuclear Information System (INIS)

    Kubacki, J. Jr.

    1992-01-01

    This paper reports on the primary cost component for most gas-fired cogeneration or on-site power projects, cost of natural gas. Often gas comprises 50 to 65% of total project costs over the life of the project. Thus it is very important to focus on natural gas sourcing, pricing, transportation and storage. This important task should not be blindly delegated to a gas supplier. The end user must develop a gas strategy that results in the most cost-effective burnertip price. Long-term natural gas supplies are usually source from the three major producing regions: Mod-Continent, Gulf Coast, and Western Canada. A well-reasoned gas strategy must include: determination of transportation and distribution options from the project site to potential gas sources (including direct interconnection of the project to interstate pipelines); acquisition of competitive gas bids from suppliers in appropriate regions; negotiation of potential discounts from interstate pipelines and local distribution companies (LDCs); fine-tuning project economics by, for example, using storage to maximize transportation load factor; and pricing mechanisms that meet economic parameters of the project. This paper uses a hypothetical project in the Midwest to examine the major factors in devising a cost-effective natural gas sourcing

  19. Natural Gas Exploration and Supply in India and the Prospects of a Bangladesh-to-India Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Rashid, Mamunur [Tokyo Institute of Technology (Japan)

    2009-07-01

    Energy consumption in India is growing very rapidly. India.s own existing as well as any new discoveries of natural gas revenues may meet only a fraction of its growing demand for energy. Hence, it will become more dependent on the global market for the supply of gas. But it is always difficult for different nations to reach a bilateral agreement on joint projects such as gas pipelines. India has been importing natural gas mostly in the form of Liquefied Natural Gas (LNG). But for the last two decades, it has shown an increasing interest in importing gas from international market by a pipeline. For example, it has planned to import natural gas from Iran, Myanmar, Bangladesh, and Turkmenistan via a pipeline. But India.s best option is to purchase gas from its neighbor Bangladesh via a pipeline. Union Oil of California (Unocal), a large investor in Bangladeshi gas, has proposed to build a pipeline, to sell the gas from its Bibiyana field. A Bangladesh-India pipeline potentially offers several socio-economic benefits. But the project, however, so far has made a little progress. Political issues attached to the project. If the Bangladeshi pipeline plan fails, India will turn other alternative options to meet its gas demand. India already has entered into agreement with International consortiums for LNG purchase. Furthermore, the country is also keen on increasing its effort to develop non-conventional sources in the near future. If these alternatives become viable, India.s demand for and dependence on foreign natural gas will decrease and natural gas (of Bangladesh, for example) might lose some of its value. Keywords: Natural gas exploration and supply in India and Bangladesh, Bangladesh-to-India pipeline, Unocal, natural gas import, market, politics, LNG, non-conventional hydrocarbon sources.

  20. Considerations about the Urucu-Manaus gas pipeline design; Consideracoes sobre o projeto do gasoduto Urucu-Manaus

    Energy Technology Data Exchange (ETDEWEB)

    Villela, Claudio Henrique Lobianco G.; Correia, Luiz de Carvalho Dias [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The main purpose of this job is to present the characteristics that influenced the elaboration of the Urucu-Manaus Gas Pipeline Project and the difference between this pipeline and other pipelines already installed on the Amazon region. In this project were emphasized the aspects related to the route definition, mapping technologies that had not been utilized in our pipeline projects, the crossing of vast flooded areas, requiring specific studies, as well the minimization of the environment impacts, in this case the existence of animal species present only in this region. Other differential factor was the Rio Negro crossing, where the pipeline will be installed in the riverbed. The know-how attained with this project consolidates ever so the activity of building pipelines in tropical forest regions. (author)

  1. Deliverability on the interstate natural gas pipeline system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Deliverability on the Interstate Natural Gas Pipeline System examines the capability of the national pipeline grid to transport natural gas to various US markets. The report quantifies the capacity levels and utilization rates of major interstate pipeline companies in 1996 and the changes since 1990, as well as changes in markets and end-use consumption patterns. It also discusses the effects of proposed capacity expansions on capacity levels. The report consists of five chapters, several appendices, and a glossary. Chapter 1 discusses some of the operational and regulatory features of the US interstate pipeline system and how they affect overall system design, system utilization, and capacity expansions. Chapter 2 looks at how the exploration, development, and production of natural gas within North America is linked to the national pipeline grid. Chapter 3 examines the capability of the interstate natural gas pipeline network to link production areas to market areas, on the basis of capacity and usage levels along 10 corridors. The chapter also examines capacity expansions that have occurred since 1990 along each corridor and the potential impact of proposed new capacity. Chapter 4 discusses the last step in the transportation chain, that is, deliverability to the ultimate end user. Flow patterns into and out of each market region are discussed, as well as the movement of natural gas between States in each region. Chapter 5 examines how shippers reserve interstate pipeline capacity in the current transportation marketplace and how pipeline companies are handling the secondary market for short-term unused capacity. Four appendices provide supporting data and additional detail on the methodology used to estimate capacity. 32 figs., 15 tabs.

  2. Energy geopolitics and Iran-Pakistan-India gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Verma, Shiv Kumar [Political Geography Division, Center for International Politics, Organization and Disarmament, School of International Studies, Jawaharlal Nehru University, New Delhi 110067 (India)]. E-mail: vermajnu@gmail.com

    2007-06-15

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this

  3. Polish Standard of the Technical Safety of Transmission Gas Pipelines

    International Nuclear Information System (INIS)

    Tkacz, A.J.

    2006-01-01

    The document is presenting the idea of the CNGI Norm called The Polish Standard of the Technical Safety of Transmission Gas Pipelines and the way of using it by companies associated in the Chamber of the Natural Gas Industry in the business activity. It will be applied to improve the quality and reliability of gas transmission after full opening of Polish natural gas market. (author)

  4. Statistics of interstate natural gas pipeline companies, 1991

    International Nuclear Information System (INIS)

    1993-01-01

    This report, presents financial and operating information of all major interstate natural gas pipeline companies that operated in the United States during 1991. This report is used by the Federal Energy Regulatory Commission (FERC), State utility commissions, other government agencies, and the general public. The information is taken from FERC Form 2, ''Annual Report of Major Natural Gas Companies,'' as filed with FERC

  5. The Effect of Landslide on Gas Pipeline

    Directory of Open Access Journals (Sweden)

    Valkovič Vojtech

    2016-11-01

    Full Text Available The present paper deals with the calculation of stresses on the pipeline system embedded on a flexible substrate which is burdened by a landslide. As well as taking into account the probability of the influences acting on the pipe as wall thickness, and others.

  6. 78 FR 34703 - Pipeline Safety: Information Collection Activities, Revision to Gas Distribution Annual Report

    Science.gov (United States)

    2013-06-10

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0004] Pipeline Safety: Information Collection Activities, Revision to Gas Distribution Annual Report AGENCY: Pipeline and Hazardous Materials Safety Administration, DOT. ACTION: Notice and request...

  7. Development of ecologically safe method for main oil and gas pipeline trenching

    Directory of Open Access Journals (Sweden)

    Akhmedov Asvar Mikdadovich

    2014-05-01

    Full Text Available Constructive, technical and technological reliability of major pipeline ensures ecological safety on different stages of life circle - beginning with project preparation activities up to the end of major pipeline operation. Even in the process of transition into new life circle stage, no matter if the pipeline needs major repairs or reconstruction, such technical and technological solutions should be found, which would preserve ecological stability of nature-anthropogenic system. Development of ecology protection technologies of construction, reconstruction and major repairs of main pipelines is of great importance not only for a region, but ensures ecological safety across the globe. The article presents a new way of trenching the main oil and gas pipeline, preservation and increase of ecological safety during its service. The updated technological plan is given in the paper for overhaul of the main oil and gas pipeline using the new technology of pipeline trenching. The suggested technical solution contributes to environment preservation with the help of deteriorating shells - the shells’ material decomposes into environment-friendly components: carbon dioxide, water and humus. The quantity of polluting agents in the atmosphere decreases with the decrease of construction term and quantity of technical equipment.

  8. Risk and integrity management system for PETRONAS Gas Berhad's gas and liquid hydrocarbon pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Khalid, Tuan Hj. Ahmad Nadzri bin; Nasir, Osman; Napiah, Mohd Nazmi Mohd Ali [PETRONAS Gas Berhad, Johor (Malaysia); Choong, Evelyn

    2005-07-01

    PETRONAS Gas Berhad (PGB), Malaysia currently operates one of Southeast Asia's largest onshore pipeline systems comprising more than 2,500 km of large diameter high pressure gas and liquid transmission, supply and lateral pipelines. Recognizing the value of a risk based approach to pipeline integrity management program, in 2002 PGB implemented a customized and fully integrated Risk and Integrity Management System (RIMS) which included software modules for: data management; semi-quantitative risk assessment; risk control cost benefit analyses; defect assessment; corrosion growth modeling; and reporting. As part of this project, a benchmarking study performed jointly with the contractor, PGB's pipeline integrity programs were also compared with a broad group of international pipeline operators. This study compared the relative ranking position of PGB pre- and post implementation of RIMS. It demonstrated that implementation of RIMS places PGB in a select group of first quartile international pipeline operators, with respect to the implementation of pipeline integrity management best practice. This paper describes the functionalities of RIMS system and how it has benefited PGB, which have been realized to date from its implementation. (author)

  9. High-speed hierarchical pipeline for radiological projection data acquisition

    International Nuclear Information System (INIS)

    Kang Kejun; Wang Jingjin; Xu Qichun; Gao Wenhuan; Fu Changqing

    1993-01-01

    Modern radiological imaging system needs fast data acquisition technology of high density projection acquiring. For this reason, a new type of pipeline, which has multi-stage and hierarchical structure, was developed. By this pipeline, the dead time of the data acquisition system was greatly reduced, and then the throughput of the whole system was increased

  10. A computational genomics pipeline for prokaryotic sequencing projects.

    Science.gov (United States)

    Kislyuk, Andrey O; Katz, Lee S; Agrawal, Sonia; Hagen, Matthew S; Conley, Andrew B; Jayaraman, Pushkala; Nelakuditi, Viswateja; Humphrey, Jay C; Sammons, Scott A; Govil, Dhwani; Mair, Raydel D; Tatti, Kathleen M; Tondella, Maria L; Harcourt, Brian H; Mayer, Leonard W; Jordan, I King

    2010-08-01

    New sequencing technologies have accelerated research on prokaryotic genomes and have made genome sequencing operations outside major genome sequencing centers routine. However, no off-the-shelf solution exists for the combined assembly, gene prediction, genome annotation and data presentation necessary to interpret sequencing data. The resulting requirement to invest significant resources into custom informatics support for genome sequencing projects remains a major impediment to the accessibility of high-throughput sequence data. We present a self-contained, automated high-throughput open source genome sequencing and computational genomics pipeline suitable for prokaryotic sequencing projects. The pipeline has been used at the Georgia Institute of Technology and the Centers for Disease Control and Prevention for the analysis of Neisseria meningitidis and Bordetella bronchiseptica genomes. The pipeline is capable of enhanced or manually assisted reference-based assembly using multiple assemblers and modes; gene predictor combining; and functional annotation of genes and gene products. Because every component of the pipeline is executed on a local machine with no need to access resources over the Internet, the pipeline is suitable for projects of a sensitive nature. Annotation of virulence-related features makes the pipeline particularly useful for projects working with pathogenic prokaryotes. The pipeline is licensed under the open-source GNU General Public License and available at the Georgia Tech Neisseria Base (http://nbase.biology.gatech.edu/). The pipeline is implemented with a combination of Perl, Bourne Shell and MySQL and is compatible with Linux and other Unix systems.

  11. Regulatory reform for natural gas pipelines: The effect on pipeline and distribution company share prices

    Science.gov (United States)

    Jurman, Elisabeth Antonie

    1997-08-01

    The natural gas shortages in the 1970s focused considerable attention on the federal government's role in altering energy consumption. For the natural gas industry these shortages eventually led to the passage of the Natural Gas Policy Act (NGPA) in 1978 as part of the National Energy Plan. A series of events in the decade of the 1980s has brought about the restructuring of interstate natural gas pipelines which have been transformed by regulators and the courts from monopolies into competitive entities. This transformation also changed their relationship with their downstream customers, the LDCs, who no longer had to deal with pipelines as the only merchants of gas. Regulatory reform made it possible for LDCs to buy directly from producers using the pipelines only for delivery of their purchases. This study tests for the existence of monopoly rents by analyzing the daily returns of natural gas pipeline and utility industry stock price data from 1982 to 1990, a period of regulatory reform for the natural gas industry. The study's main objective is to investigate the degree of empirical support for claims that regulatory reforms increase profits in the affected industry, as the normative theory of regulation expects, or decrease profits, as advocates of the positive theory of regulation believe. I also test Norton's theory of risk which predicts that systematic risk will increase for firms undergoing deregulation. Based on a sample of twelve natural gas pipelines, and 25 utilities an event study concept was employed to measure the impact of regulatory event announcements on daily natural gas pipeline or utility industry stock price data using a market model regression equation. The results of this study provide some evidence that regulatory reforms did not increase the profits of pipeline firms, confirming the expectations of those who claim that excess profits result from regulation and will disappear, once that protection is removed and the firms are operating in

  12. Real gas flow simulation in damaged distribution pipelines

    International Nuclear Information System (INIS)

    Kostowski, Wojciech J.; Skorek, Janusz

    2012-01-01

    The paper discusses chosen issues concerning damaged gas pipelines. Attention is paid to modelling the steady-state flow of natural gas in distribution pipelines, and the most commonly applied models of isothermal and adiabatic flow are evaluated for both the ideal and the real gas properties. A method of accounting for a leakage by means of a reference flow equation with a discharge coefficient is presented, and the dependency of the discharge coefficient on pressure is demonstrated both with literature data and the authors' experimental results. A relevant computational study of a pipeline failure is presented for a high- and a medium pressure pipeline. The importance of an appropriate choice of the flow model (isothermal or adiabatic flow of real or ideal gas) is demonstrated by the results of the study. It is shown that accounting for the variability of the discharge coefficient is required if medium pressure pipelines are analysed. However, it is eventually shown that the impact of the discharge coefficient on the predicted outflow rate is of lesser importance than that of the applied flow model. -- Highlights: ► Comparison of real/ideal gas, isothermal/adiabatic gas flow in a damaged pipeline. ► Variability of the discharge coefficient with pressure is demonstrated. ► Isothermal model predicts wrong values of downstream pressure, not just temperature. ► Isothermal model may cause significant error (for 2 case studies is >20%). ► Error in the discharge coefficient has a weak influence on the predicted flow rate.

  13. 75 FR 72877 - Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements

    Science.gov (United States)

    2010-11-26

    ... pipeline facilities that could result in $50,000 damage (the value of a typical residential meter set is a... and to establish a volumetric basis for reporting unexpected or unintentional gas loss. 3. Require... every effort to assure that the outcome of this rulemaking will minimize the need for any future changes...

  14. The Independence Pipeline project : ANR's supply link - Independence Pipeline, Transco's market link

    International Nuclear Information System (INIS)

    Persells, T.

    1998-01-01

    An overview of the Independence Pipeline project was presented. The project offers access from Chicago to the U.S. Midwest market, as well as to Ontario via MichCon, Consumers Power, Great Lakes and Panhandle. The project has three components: ANR's Supply Link, the Independence Pipeline and Transco's MarketLink. The three components are budgeted at $ 1.332 billion dollars and projected for completion between Nov 1999 and Nov 2000. Each component (services, access advantages, market links, rates, storage services, etc ) are described separately. figs

  15. Fiscal 1999 report on basic research for promotion of joint implementation programs. Gas pipeline system optimization involving Ukrainian pipeline modification for reduction in global warming gas emissions; 1999 nendo ondanka gas haishutsu sakugen no tame no Ukraina ni okeru gas pipeline no kaishu wo fukumu pipeline system no saitekika chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The result of a survey which involves a 520km-long gas pipeline (Shebelinka-Dikanka-Kyiv) modification in the Ukraine is described, which will promote joint implementation programs under COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change). Since the greenhouse effect of methane gas is 21 times as serious as that of CO2, it is important to ensure good maintenance and structural soundness for natural gas transporting pipeline systems. The currently available Ukrainian gas turbines and compressors are so obsolescent that their efficiency rate is as low as 23%. The rate will rise to 36% when the old ones are replaced by high power equipment capable of high efficiency combustion. Pipelines will be checked for deterioration due to stress corrosion cracking and dangerous pipes will be replaced, with attention paid particularly to joint sections. It is expected that there will be a greenhouse gas reduction of 512,000 tons (in terms of CO2) and a saving of 103,000 tons on fuel (in terms of crude). Balance is tentatively estimated in case the expected reduction in emissions is transacted in emission trading. Profitability will occur, in view of profit from emission trading and gas sales revenue after gas leakage prevention thanks to project implementation, when the emission right sells at 30 dollars/ton or higher. The rippling effect will be great now that the Ukrainian pipeline system is quite extensive (with 30% thereof superannuated). (NEDO)

  16. On Leak Localization in the Main Branched and Simple Inclined Gas Pipelines

    OpenAIRE

    T. Davitashvili; G. Gubelidze

    2013-01-01

    In this paper two mathematical models for definition of gas accidental escape localization in the gas pipelines are suggested. The first model was created for leak localization in the horizontal branched pipeline and second one for leak detection in inclined section of the main gas pipeline. The algorithm of leak localization in the branched pipeline did not demand on knowledge of corresponding initial hydraulic parameters at entrance and ending points of each sections of pipeline. For detect...

  17. Hybrid laser-gas metal arc welding (GMAW) of high strength steel gas transmission pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Harris, Ian D.; Norfolk, Mark I. [Edison Welding Institute (EWI), Columbus, Ohio (United States)

    2009-07-01

    Hybrid Laser/arc welding process (HLAW) can complete 5G welds, assure weld soundness, material properties, and an acceptable geometric profile. Combining new lasers and pulsed gas metal arc welding (GMAW-P) has led to important innovations in the HLAW process, increasing travel speed for successful root pass welding. High power Yb fiber lasers allow a 10 kW laser to be built the size of a refrigerator, allowing portability for use on the pipeline right-of-way. The objective was to develop and apply an innovative HLAW system for mechanized welding of high strength, high integrity, pipelines and develop 5G welding procedures for X80 and X100 pipe, including mechanical testing to API 1104. A cost-matched JIP developed a prototype HLAW head based on a commercially available bug and band system (CRC-Evans P450). Under the US Department of Transportation (DOT) project, the subject of this paper, the system was used to advance pipeline girth welding productivity. External hybrid root pass welding achieved full penetration welds with a 4-mm root at a travel speed of 2.3-m/min. Welds were made 'double down' using laser powers up to 10 kW and travel speeds up to 3-m/min. The final objective of the project was to demonstrate the hybrid LBW/GMAW system under simulated field conditions. (author)

  18. Blending Hydrogen into Natural Gas Pipeline Networks: A Review of Key Issues

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. W.; Antonia, O.; Penev, M.

    2013-03-01

    The United States has 11 distinct natural gas pipeline corridors: five originate in the Southwest, four deliver natural gas from Canada, and two extend from the Rocky Mountain region. This study assesses the potential to deliver hydrogen through the existing natural gas pipeline network as a hydrogen and natural gas mixture to defray the cost of building dedicated hydrogen pipelines.

  19. Optimal Energy Consumption Analysis of Natural Gas Pipeline

    Science.gov (United States)

    Liu, Enbin; Li, Changjun; Yang, Yi

    2014-01-01

    There are many compressor stations along long-distance natural gas pipelines. Natural gas can be transported using different boot programs and import pressures, combined with temperature control parameters. Moreover, different transport methods have correspondingly different energy consumptions. At present, the operating parameters of many pipelines are determined empirically by dispatchers, resulting in high energy consumption. This practice does not abide by energy reduction policies. Therefore, based on a full understanding of the actual needs of pipeline companies, we introduce production unit consumption indicators to establish an objective function for achieving the goal of lowering energy consumption. By using a dynamic programming method for solving the model and preparing calculation software, we can ensure that the solution process is quick and efficient. Using established optimization methods, we analyzed the energy savings for the XQ gas pipeline. By optimizing the boot program, the import station pressure, and the temperature parameters, we achieved the optimal energy consumption. By comparison with the measured energy consumption, the pipeline now has the potential to reduce energy consumption by 11 to 16 percent. PMID:24955410

  20. International gas trade: Potential major projects

    International Nuclear Information System (INIS)

    Haamsoe, B.; Mashayekhi, A.; Razavi, H.

    1994-01-01

    The present paper reviews some key factors affecting continued expansion of the use and trade of natural gas, with a particular focus on a group of major gas trade and transport projects now in various stages of consideration. The paper begins by outlining the distribution of potential gas supplies, it also sketches the sectorial and regional structures of potential demand for natural gas. It continues by considering current and emerging trends in the international trade of natural gas by pipeline and as liquefied natural gas (LNG). Within the context thus provided, the paper then details a number of significant potential gas trade and transportation projects individually. Finally, the paper comments on the challenges in financing and implementing gas projects, especially with regard to economic, political, and institutional issues in the producing, transit, and consuming countries

  1. Mathematical modeling of non-stationary gas flow in gas pipeline

    Science.gov (United States)

    Fetisov, V. G.; Nikolaev, A. K.; Lykov, Y. V.; Duchnevich, L. N.

    2018-03-01

    An analysis of the operation of the gas transportation system shows that for a considerable part of time pipelines operate in an unsettled regime of gas movement. Its pressure and flow rate vary along the length of pipeline and over time as a result of uneven consumption and selection, switching on and off compressor units, shutting off stop valves, emergence of emergency leaks. The operational management of such regimes is associated with difficulty of reconciling the operating modes of individual sections of gas pipeline with each other, as well as with compressor stations. Determining the grounds that cause change in the operating mode of the pipeline system and revealing patterns of these changes determine the choice of its parameters. Therefore, knowledge of the laws of changing the main technological parameters of gas pumping through pipelines in conditions of non-stationary motion is of great importance for practice.

  2. Jerneh gas project challenges and implementation performance

    International Nuclear Information System (INIS)

    Perreau, M.E.

    1993-01-01

    The Jerneh gas project is part of Peninsular Malaysia's Gas Utilization Project, a mammoth undertaking to provide gas from the offshore fields off Malaysia's East Coast, to power stations and other industrial users throughout Peninsular Malaysia and Singapore. Prior to 1992, the only customers of the offshore Peninsular Malaysia gas were a local power station, and a steel mill in Terengganu, linked to the Phase 1 pipeline system. The Bekok platform is Esso Production Malaysia Inc. (EPMI)'s gas collection platform for existing associated gas fields. The Duyong and Sotong platforms are gas production/compression platforms operated by PETRONAS. In late 1991, the onshore pipeline system was extended by PETRONAS to cover the west and south coasts of Peninsular Malaysia and Singapore depicted in the map as the Phase 2 system. With the completion of the Jerneh platform and offshore trunklines, Jerneh became the primary source of supply to an increased number of customers in the wider Phase 2 gas network. Jerneh is estimated to have three TCF of non-associated gas. Phase 1 customers were utilizing about 120 MSCFD and the demand is expected to initially step-up to 400 MSCFD in 1992 and progressively increase thereafter. This paper provides an overview of the US$400 M Jerneh project for which detailed design commenced in 1989 and was commissioned in 1992. The paper describes the technical challenges, project execution, safety record and actions to achieve the fast track schedule for this project

  3. For the North, from the North : Enbridge perspectives on a Mackenzie Valley gas pipeline

    International Nuclear Information System (INIS)

    Porter, E.

    2000-01-01

    The increase in natural gas demand and strong gas prices are the main driving forces behind northern pipeline development. While Western Canada can supply much of the demand growth to key markets in the Pacific Northwest, California, Eastern Canada, as well as the Eastern and Midwestern U.S. it is not expected to supply all the growth. Producers are acquiring land in the Northwest Territories (NWT) and planning to increase drilling activity. In February 2000, Imperial, Gulf, Shell and Mobil entered into an agreement to study the feasibility of developing Mackenzie Delta gas, a study in which Enbridge Inc. participated. Enbridge is the major transporter of Canadian crude oil and liquids and they have a growing involvement in natural gas transmission. They also own and operate the largest gas distribution company in Canada. They have extensive Northern experience and already operate two pipelines in the NWT. The proposed 2,100 km, 36 inch pipeline will transport 1.2 bcf/d of natural gas increasing to 1.7 bcf/d with more compression. Its estimated cost is $4.2 billion. Some of the economic risks of such a project include the need for large amounts of equity, timing of market development, competing sources of gas, and stability of gas prices. The multitude of regulatory processes are also complex. Clarity is needed in many jurisdictional processes. Support of indigenous people is also crucial. A historic January 25, 2000 meeting of Aboriginal leaders of the Northwest Territories resulted in a declaration of support for a Mackenzie Valley pipeline. Protecting the permafrost is also a priority when constructing and operating a pipeline in the North. It is unlikely that Mackenzie Delta gas will flow before 7 years .13 figs

  4. Simulation of non-isothermal transient flow in gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira Junior, Luis Carlos; Soares, Matheus; Lima, Enrique Luis; Pinto, Jose Carlos [Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Quimica; Muniz, Cyro; Pires, Clarissa Cortes; Rochocz, Geraldo [ChemTech, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Modeling of gas pipeline usually considers that the gas flow is isothermal (or adiabatic) and that pressure changes occur instantaneously (quasi steady state approach). However, these assumptions are not valid in many important transient applications (changes of inlet and outlet flows/pressures, starting and stopping of compressors, changes of controller set points, among others). Besides, the gas properties are likely to depend simultaneously on the pipe position and on the operation time. For this reason, a mathematical model is presented and implemented in this paper in order to describe the gas flow in pipeline when pressure and temperature transients cannot be neglected. The model is used afterwards as a tool for reconciliation of available measured data. (author)

  5. AIRBORNE, OPTICAL REMOTE SENSNG OF METHANE AND ETHANE FOR NATURAL GAS PIPELINE LEAK DETECTION

    Energy Technology Data Exchange (ETDEWEB)

    Jerry Myers

    2005-04-15

    Ophir Corporation was awarded a contract by the U. S. Department of Energy, National Energy Technology Laboratory under the Project Title ''Airborne, Optical Remote Sensing of Methane and Ethane for Natural Gas Pipeline Leak Detection'' on October 14, 2002. The scope of the work involved designing and developing an airborne, optical remote sensor capable of sensing methane and, if possible, ethane for the detection of natural gas pipeline leaks. Flight testing using a custom dual wavelength, high power fiber amplifier was initiated in February 2005. Ophir successfully demonstrated the airborne system, showing that it was capable of discerning small amounts of methane from a simulated pipeline leak. Leak rates as low as 150 standard cubic feet per hour (scf/h) were detected by the airborne sensor.

  6. Recommendations on X80 steel for the design of hydrogen gas transmission pipelines

    International Nuclear Information System (INIS)

    Briottet, L.; Batisse, R.; De Dinechin, G.; Langlois, P.; Thiers, L.

    2012-01-01

    By limiting the pipes thickness necessary to sustain high pressure, high-strength steels could prove economically relevant for transmitting large gas quantities in pipelines on long distance. Up to now, the existing hydrogen pipelines have used lower-strength steels to avoid any hydrogen embrittlement. The CATHY-GDF project, funded by the French National Agency for Research, explored the ability of an industrial X80 grade for the transmission of pressurized hydrogen gas in large diameter pipelines. This project has developed experimental facilities to test the material under hydrogen gas pressure. Indeed, tensile, toughness, crack propagation and disc rupture tests have been performed. From these results, the effect of hydrogen pressure on the size of some critical defects has been analyzed allowing proposing some recommendations on the design of X80 pipe for hydrogen transport. Cost of Hydrogen transport could be several times higher than natural gas one for a given energy amount. Moreover, building hydrogen pipeline using high grade steels could induce a 10 to 40% cost benefit instead of using low grade steels, despite their lower hydrogen susceptibility. (authors)

  7. Residual stresses evaluation in a gas-pipeline crossing

    Energy Technology Data Exchange (ETDEWEB)

    Fonseca, Maria Cindra [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil); Almeida, Manoel Messias [COMPAGAS, Curitiba, PR (Brazil); Rebello, Joao Marcos Alcoforado [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil); Souza Filho, Byron Goncalves de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The X-rays diffraction technique is a well established and effectiveness method in the determination of the residual and applied stresses in fine grained crystalline materials. It allows to characterize and to quantify the magnitude and direction of the existing surface stresses in the studied point of the material. The objective of this work is the evaluation of the surface stresses in a 10 in diameter Natural Gas Distribution Pipeline manufactured from API 5 L Gr B steel of COMPAGAS company, in a crossing with a Natural Gas Transportation Pipeline, in Araucaria-PR. This kind of evaluation is important to establish weather you have to perform a repositioning of one of the pipeline or not. The measurements had been made in two transversal sections of the pipe, the one upstream (170 mm of the external wall of the pipeline) and another one downstream (840 mm of the external wall of the pipeline). Each transversal section measurements where carried out in 3 points: 9 hours, 12 hours and 3 hours. In each measured point of the pipe surface, the longitudinal and transversal stresses had been measured. The magnitude of the surface residual stresses in the pipe varied of +180 MPa at the -210 MPa. The residual stress state on the surface of the points 12 hours region is characterized by tensile stresses and by compressive stresses in the points of 3 and 9 hours region. The surface residual stresses in gas-pipeline have been measured using X-ray diffraction method, by double exposure technique, using a portable apparatus, with Cr-K-alpha radiation. (author)

  8. Laser-based gas sensors keep moisture out of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2006-07-15

    Natural gas often contains contaminants that cause corrosion, and long-term deterioration, and must be cleaned and brought to pipeline standards before it can be delivered to high-pressure, long-distance pipelines. Many older sensors produce false data that can result in contaminated gas getting through. This article presented details of the SpectraSensor, a new laser-based sensor technology used by the El Paso Natural Gas Company (EPNG). The SpectraSensor is comprised of a tunable diode laser (TDL) based technology developed by the National American Space Agency (NASA). The gas analyzer provides non-contact measurement of moisture, carbon dioxide, and other corrosives in natural gas pipelines, and the tunable laser-based gas sensors are fast, accurate, and flexible. Producers can monitor El Paso's gas analyzer readings by capturing the electronic signal from El Paso's unit via a SCADA system and view the readings from control rooms. While initial purchase price is higher than more problematic surface-based gas sensors, an evaluation of the technology has indicated that maintenance savings alone may provide an almost immediate return on investments. Unlike electrochemical and crystal gas sensors, laser-based gas analyzers do not come into direct contact with any substances, a fact which practically eliminates maintenance and operational costs. Studies have shown that the cost of operating conventional electrochemical sensors can result in a cumulative annual expense exceeding $50,000 per unit including labour; recalibration and rebuilding; back-up sensor heads; and gas dehydration and tariffs. 1 fig.

  9. US gas pipelines respond to FERC Order 636

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that U.S. pipelines are continuing to examine the react to the Federal Energy Regulatory Commission's Order 636. Among the latest responses: Bill Vititoe, president and chief executive officer of ANR Pipeline Co., a subsidiary of Coastal Corp., Houston, the his company's recently proposed comprehensive service restructuring and rate settlement basically is consistent with Order 636. Paul M. Anderson, executive vice-president of Panhandle Eastern Corp., Houston, the Order 63 likely will increase reliance on long term gas sales contracts and shrink or eliminate spot market sales

  10. 76 FR 79673 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2011-12-22

    ... Pipeline Company, L.L.C.; Notice of Application On December 9, 2011, Tennessee Gas Pipeline Company, L.L.C... (Commission) an application under section 7(c) of the Natural Gas Act (NGA), as amended, and part 157 of the... Rocan, Senior Counsel, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas...

  11. Blending Hydrogen into Natural Gas Pipeline Networks. A Review of Key Issues

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. W. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Antonia, O. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-03-01

    This study assesses the potential to deliver hydrogen through the existing natural gas pipeline network as a hydrogen and natural gas mixture to defray the cost of building dedicated hydrogen pipelines. Blending hydrogen into the existing natural gas pipeline network has also been proposed as a means of increasing the output of renewable energy systems such as large wind farms.

  12. 77 FR 65508 - Annual Charge Filing Procedures for Natural Gas Pipelines

    Science.gov (United States)

    2012-10-29

    ...] Annual Charge Filing Procedures for Natural Gas Pipelines AGENCY: Federal Energy Regulatory Commission... FERC) is proposing to amend its regulations to revise the filing requirements for natural gas pipelines...) clause. Currently, natural gas pipelines utilizing an ACA clause must make a tariff filing to reflect a...

  13. 77 FR 10415 - Standards for Business Practices for Interstate Natural Gas Pipelines

    Science.gov (United States)

    2012-02-22

    ...] Standards for Business Practices for Interstate Natural Gas Pipelines AGENCY: Federal Energy Regulatory... American Energy Standards Board (NAESB) applicable to natural gas pipelines.\\1\\ The Commission also... Quadrant (WGQ) of the North American Energy Standards Board (NAESB) applicable to natural gas pipelines...

  14. 77 FR 43711 - Standards for Business Practices of Interstate Natural Gas Pipelines

    Science.gov (United States)

    2012-07-26

    ...; Order No. 587-V] Standards for Business Practices of Interstate Natural Gas Pipelines AGENCY: Federal... North American Energy Standards Board (NAESB) applicable to natural gas pipelines. In addition, based on... (WGQ) of the North American Energy Standards Board (NAESB) applicable to natural gas pipelines...

  15. Freezing around a pipeline carrying cooled gas in flooded areas

    Energy Technology Data Exchange (ETDEWEB)

    Koval' kov, V P; Krivoshein, B L

    1978-12-01

    The USSR's NIPIESUneftegazstroi mathematically analyzed the problem of ice formation around a subcooled-gas pipeline submerged in water in cold regions and derived charts for determining heat-transfer coefficients and the rate of ice formation for various water and gas temperatures. Because the ice halo that forms around these pipelines necessitates additional anchoring of the line, NIPIESUneftegazstroi sought to quantify the weight required in order to minimize the cost and material needed. The differential heat-transfer equations given can be used to calculate heat-transfer coefficients and the specific heat flux from the water to the ice halo, as well as the radius of the ice halo. Values of the ice-halo radius are plotted graphically as parabolic function of time (to 15,000 h) for pipeline surface temperatures of 30.2, 27.5, 23, 18.5, and 14/sup 0/F. An equation indicates the limiting value of the temperature of the transported gas at which icing of an insulated pipeline will not occur.

  16. Engineering considerations for corrosion monitoring of gas gathering pipeline systems

    Energy Technology Data Exchange (ETDEWEB)

    Braga, T.G.; Asperger, R.G.

    1987-01-01

    Proper corrosion monitoring of gas gathering pipelines requires a system review to determine the appropriate monitor locations and types of monitoring techniques. This paper develops and discusses a classification of conditions such as flow regime and gas composition. Also discussed are junction categories which, for corrosion monitoring, need to be considered from two points of view. The first is related to fluid flow in the line and the second is related corrosion inhibitor movement along the pipeline. The appropriate application of the various monitoring techniques such as coupons, hydrogen detectors, electrical resistance probe and linear polarization probes are discussed in relation to flow regime and gas composition. Problems caused by semi-conduction from iron sulfide are considered. Advantages and disadvantages of fluid gathering methods such as pots and flow-through drips are discussed in relation to their reliability as on-line monitoring locations.

  17. Evaluation of Failure Pressure for Gas Pipelines with Combined Defects

    Directory of Open Access Journals (Sweden)

    Tadas Vilkys

    2018-05-01

    Full Text Available The paper presents the study of the influence of mechanical damage on the safe operation of gas transmission pipelines. The main types of pipeline damage with the actual parameters and their influence on the operational parameters are analysed. The damaged fractures of the section of the pipeline Kaunas (Lithuania–Kaliningrad (Russia were investigated in the laboratory. The main operational characteristics and the structure of the pipeline’s metal after the period of long-term operation were determined using various research and experimental methods. The influence of the pipeline’s damage was modelled by using the Finite Element Method and the ANSYS code. The predictions of the failure pressure were made, taking into consideration the actual properties of the pipeline’s metal. Techniques including the hardness and microhardness measurement, chemical analysis, the impact strength test, and metallography analysis with an optical microscope, were used in the experimental study.

  18. Safety distance between underground natural gas and water pipeline facilities

    International Nuclear Information System (INIS)

    Mohsin, R.; Majid, Z.A.; Yusof, M.Z.

    2014-01-01

    A leaking water pipe bursting high pressure water jet in the soil will create slurry erosion which will eventually erode the adjacent natural gas pipe, thus causing its failure. The standard 300 mm safety distance used to place natural gas pipe away from water pipeline facilities needs to be reviewed to consider accidental damage and provide safety cushion to the natural gas pipe. This paper presents a study on underground natural gas pipeline safety distance via experimental and numerical approaches. The pressure–distance characteristic curve obtained from this experimental study showed that the pressure was inversely proportional to the square of the separation distance. Experimental testing using water-to-water pipeline system environment was used to represent the worst case environment, and could be used as a guide to estimate appropriate safety distance. Dynamic pressures obtained from the experimental measurement and simulation prediction mutually agreed along the high-pressure water jetting path. From the experimental and simulation exercises, zero effect distance for water-to-water medium was obtained at an estimated horizontal distance at a minimum of 1500 mm, while for the water-to-sand medium, the distance was estimated at a minimum of 1200 mm. - Highlights: • Safe separation distance of underground natural gas pipes was determined. • Pressure curve is inversely proportional to separation distance. • Water-to-water system represents the worst case environment. • Measured dynamic pressures mutually agreed with simulation results. • Safe separation distance of more than 1200 mm should be applied

  19. Economics of LNG and pipeline gas export from GC C

    International Nuclear Information System (INIS)

    White, N.

    1995-01-01

    This paper briefly reviews the economic and non-economic considerations underlying gas exports from the GC C and the Arabian Peninsula in general. It addresses four themes: policy issues, political risks, technical risks and economics. It examines the distance between the regional resource areas and the major gas markets in the Far East and Europe, and examines the implications for moving gas to those markets in liquid form or by pipeline, in terms of number of LNG vessels required, and capital costs. (Author)

  20. The gas century: worldwide LNG developments may deal death blow to Alaskan pipeline dream

    International Nuclear Information System (INIS)

    Lorenz, A.

    2004-01-01

    The growing interest in liquefied natural gas (LNG), which casts doubt on the viability of the Alaska gas pipeline, and the potential impacts on Canadian gas exports to the United States are discussed. There is currently a proposal before Congress for an Alaskan LNG project, and consensus appears to be building among American energy experts and law-makers that building a multitude of LNG facilities would be more flexible and cheaper than building the proposed Alaska pipeline. As further proof of the growing popularity of LNG, U.S. industry lobbyists are said to be rapidly gaining congressional support for the idea of building eight to ten billion cubic feet per day of LNG capacity along the U. S. coast. Either development, -- LNG facilities or the Alaska pipeline -- have the potential to seriously impact Canadian natural gas exports. If the Alaska pipeline is built, the addition of five billion cubic feet per day of new gas on the market would cause gas prices to fall; if the U.S. decides to subsidize its gas industry, Canadian gas would be put at a serious disadvantage. Conversely, if the Alaskan LNG proposal were to succeed, the potential demise of the Alaska pipeline would mean the loss of about 12,000 jobs that would be created during the Canadian construction phase of the pipeline, as well as the loss of tariffs. Industry experts predict that by 2005 LNG terminals will dot the periphery of the U. S. coast line; to prepare for these eventualities, Canadian companies, such as Irving Oil, TransCanada Pipelines and EnCana are taking note, and are scrambling not to be left out of the game. As proof of the seriousness of their concern, Irving Oil is adding a Can$500 million LNG facility to its Canaport terminal on the Scotian shelf; TCPL is working to supply an LNG terminal offshore Massachusetts, and EnCana is refurbishing a Louisiana salt cavern to prepare for storage of gas delivered to the Gulf Coast

  1. Study of gas pipelines cracks using transmission and scattering measures with nuclear technique

    International Nuclear Information System (INIS)

    Freitas, Marcela F.; Salgado, César M.

    2017-01-01

    Most of the natural gas production is transported through pipelines that require periodic inspections to evaluate the structural integrity of the pipelines due to possible defects caused by degradation that can rupture causing leakage of the fluid causing major disasters. Based on this, the project presents a methodology for predicting cracks in pipe used in gas pipelines. The approximation is based on the principles of gamma densitometry to calculate the density of the pipe wall in order to investigate possible cracks. The natural gas fluid is found in such systems and interferes in the density calculations and therefore will be considered in the simulations. The detection system uses a narrow beam geometry appropriately, comprising gamma ray source ( 137 Cs) and NaI(Tl) 3 ″ x 3 ″ detectors for calculating transmitted and scattered photons. Different positioning angles of the detector are investigated. In this study, the MCNP-X code is used to perform the simulations, in order to develop a counting geometry. Simulations of different thicknesses of the crack were also used to determine the minimum thickness detected by the two NaI(Tl) detectors. Having equipment that can estimate cracks present in pipes used in gas pipelines, in addition to predicting their location can reduce costs and make a major contribution to this sector. (author)

  2. Application and numerical simulation research on biomimetic drag-reducing technology for gas pipelining

    Energy Technology Data Exchange (ETDEWEB)

    Zhang Deyuan; Luo Yuehao; Chen Huawei [Beihang Univ., Beijing (China). School of Mechanical Engineering and Automation

    2011-06-15

    For the purpose of increasing the transmission capacity of gas pipelines, the internal coating technology has been vastly put into application, and a remarkable benefit has been achieved so far. However, with the reduction of wall roughness, the small convex parts are all completely submerged in the viscous sublayer, the gas pipeline becomes a 'hydraulic smooth pipe', even by smoothing the coating surface further, it is difficult to reduce wall friction. Therefore, in order to increase the transportation capacity on the basis of internal coating, the new methods and technologies should be researched and investigated, and perhaps, the biomimetic drag-reducing technology is a good approach. In this paper, according to the planning parameters of the second pipeline of the West-to-East gas transmission project, the best drag reducing effect grooves are calculated and designed, and based on the characteristics and properties of internal coating (AW-01 epoxy resin), the Pre-Cured Micro- Rolling Technology (PCMRT) is discussed and presented, the rolling equipment is also designed and analyzed, the rolling process can be easily added on the available production line. Aiming at the field operating parameters of the gas pipeline in China, and the drag-reducing effect of the grooved surface is analyzed and discussed comprehensively. In addition, the economic benefit of adopting the biomimetic drag reduction technology is investigated. (orig.)

  3. Study of gas pipelines cracks using transmission and scattering measures with nuclear technique

    Energy Technology Data Exchange (ETDEWEB)

    Freitas, Marcela F.; Salgado, César M., E-mail: marcelafreita@gmail.com, E-mail: otero@ien.gov.br [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2017-07-01

    Most of the natural gas production is transported through pipelines that require periodic inspections to evaluate the structural integrity of the pipelines due to possible defects caused by degradation that can rupture causing leakage of the fluid causing major disasters. Based on this, the project presents a methodology for predicting cracks in pipe used in gas pipelines. The approximation is based on the principles of gamma densitometry to calculate the density of the pipe wall in order to investigate possible cracks. The natural gas fluid is found in such systems and interferes in the density calculations and therefore will be considered in the simulations. The detection system uses a narrow beam geometry appropriately, comprising gamma ray source ({sup 137}Cs) and NaI(Tl) 3 ″ x 3 ″ detectors for calculating transmitted and scattered photons. Different positioning angles of the detector are investigated. In this study, the MCNP-X code is used to perform the simulations, in order to develop a counting geometry. Simulations of different thicknesses of the crack were also used to determine the minimum thickness detected by the two NaI(Tl) detectors. Having equipment that can estimate cracks present in pipes used in gas pipelines, in addition to predicting their location can reduce costs and make a major contribution to this sector. (author)

  4. Auction design for gas pipeline transportation capacity-The case of Nabucco and its open season

    International Nuclear Information System (INIS)

    Pickl, Matthias; Wirl, Franz

    2011-01-01

    As a response to the Russian dominance of the EU's natural gas supplies and the EU's increasing gas demands, major gas pipeline projects are currently under way to enhance the EU's energy supply security. Oftentimes to raise financing and to allocate gas transportation capacities, auctions are carried out to allow gas shippers to book transportation rights. In recent years, auctions have emerged as one of the most successful allocation mechanisms in the microeconomic theory. However, different auction designs can lead to different outcomes making the choice of auction design a decisive one, especially for divisible-good auctions. This paper seeks to give a formulation of an optimal auction design for gas pipeline transportation capacity. Specifically three different mechanisms are tested: (i) NPV allocation; (ii) pro rata allocation; and (iii) optimization. In addition, Nabucco is taken as a case study to empirically show results of such auction designs. Results show that a trade-off between revenue optimization and fair allocation can be observed: allocation per optimization is the favorable auction design when revenue maximization is more important than fair allocation. On the other hand, pro rata allocation is the auction design to be chosen when fairness of allocation is considered most central. - Research highlights: → Auction design for gas pipeline transportation capacity. → Empirical market-survey of Nabucco pipeline project auction as input data. → Testing of three different allocation mechanisms: (i) NPV allocation; (ii) pro rata allocation; and (iii) optimization. → Results show a trade-off between revenue optimization and fair allocation. → Allocation per optimization is the favorable auction design when revenue maximization is more important than fair allocation. → On the other hand, pro rata allocation is the auction design to be chosen when fairness of allocation is considered most central.

  5. Pipelines update : new tolls and new opportunities in gas gathering

    International Nuclear Information System (INIS)

    Shelton, E.

    1999-01-01

    An overview of the new TransCanada energy transmission system was given. TransCanada has ownership interests in seven other North American natural gas pipelines and the integration of former NOVA Gas Transmission, TransCanada Energy Transmission and ANG Pipeline organizations into a single organization is nearing completion. Integration efforts have been driven by TransCanada's commitment to provide customers with lower costs and improved service levels. The service enhancements will include one-stop shopping, customer advisory councils, harmonized design criteria, optimized operations/maintenance, and consistent billing processes. The new toll design which will replace the current postage-stamp pricing regime offered by NGTL was also reviewed, emphasizing key features such as pricing, term linked tolls, interruptible/short term tolls, renewal incentive, risk/reward collar, transition period and new services

  6. Nord stream: not just a pipeline. An analysis of the political debates in the Baltic Sea region regarding the planned gas pipeline from Russia to Germany

    Energy Technology Data Exchange (ETDEWEB)

    Whist, Bendik Solum

    2008-11-15

    This report is an analysis of the planned gas pipeline from Russia to Germany through the Baltic Sea known as Nord Stream. Although not yet realised, the project has, since its birth, been the subject of harsh criticism and opposition by a significant number of states that consider themselves affected by the pipeline. Whereas the Baltic States and Poland have interpreted the pipeline as a politically motivated strategy that will increase Russia's leverage on them and threaten their energy security, the debate in Sweden was at first mostly concerned with the prospect of increased Russian military presence in the Swedish Exclusive Economic Zone. The potential environmental impact of the pipeline has been, and continues to be, an overarching concern shared by all the littoral states of the Baltic Sea. Proponents of Nord Stream, most notably Germany, Russia and the Nord Stream consortium, have largely dismissed the concerns as unwarranted and argue that the pipeline is a common European project that all EU-members should embrace, as it will provide much-needed gas to an increasingly energy-thirsty union. This report is an extensive study of the divergent attitudes and debates that have surged in the region regarding Nord Stream, and the aim is to provide plausible explanations as to why the interpretations of the project have been so different in the various states. The report is based on a variety of sources, including several first-hand interviews with researchers and government officials in the Baltic Sea region. (author). refs.,fig.,tabs

  7. 77 FR 23472 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-04-19

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on April 4, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in the..., Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002...

  8. 78 FR 6313 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2013-01-30

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on January 14, 2013, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in... directed to Thomas G. Joyce, Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C. 1001 Louisiana...

  9. 77 FR 8247 - Tennessee Gas Pipeline Company, L.L.C. Notice of Application

    Science.gov (United States)

    2012-02-14

    ... Pipeline Company, L.L.C. Notice of Application Take notice that on February 2, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in Docket... Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420...

  10. Essays on the economics of natural gas pipelines

    Science.gov (United States)

    Oliver, Matthew E.

    The natural gas pipeline transportation industry is comprised of a primary market and a secondary market. In the primary market, pipelines sell 'firm' transport capacity contracts to gas traders, local distribution companies, and other parties. The (per unit) secondary market value of transport is rarely comparable to the regulated primary market two-part tariff. When and where available capacity in the secondary market is scarce, its value can far exceed the primary market tariffs paid by firm contract holders, generating scarcity rents. The following essays demonstrate that this phenomenon has predictable effects on natural gas spot prices, firm capacity reservations, the pipeline's capacity construction and expansion decisions, and the economic welfare of producers and consumers at the market hubs connected by the pipeline. Chapter 1 provides a theoretical framework for understanding how pipeline congestion affects natural gas spot prices within the context of the current regulatory environment, and empirically quantifies this effect over a specific regional pipeline network. As available pipeline capacity over a given route connecting two hubs becomes scarce, the spot prices for gas at the hubs are driven apart---a phenomenon indicative of some market friction that inhibits the ability of spot price arbitrage to fully integrate the two prices, undermining economic efficiency. The theoretical component of Chapter 1 illuminates a potential source of this friction: the deregulated structure of the secondary market for gas transportation services. To support and quantify the predictions of the theoretical model, the empirical component demonstrates that the effect of congestion on the secondary market value of transport---the key factor in driving apart spot prices---can be quite strong. Coefficient estimates indicate that dramatic increases in transport costs are likely to result from marginal increases in congestion. This result has important implications because

  11. Integrated diagnostics of northern gas pipelines; Diagnostic integre des gazoducs septentrionaux

    Energy Technology Data Exchange (ETDEWEB)

    Volsky, E.; Dedikov, E.; Ananenkov, A.; Salchov, Z.; Yakupov, Z. [Joint-Stock Company, Gazprom (Russian Federation)

    2000-07-01

    The main part of gas joint - stock company 'Gazprom' extracts from the northern deposits, which are situated in the permafrost zone. Ensuring of gas transporting pipeline's safety operation is a very complex and priority problem. On the basis of usage of this complex of methods the problem to ensure the safety operation is solved systematically: gas-mine - plant IV - derivation pipelines (condensate pipeline Yamburg Novy Urengoy, gas pipeline IV - GCS with negative temperature of transported products) taking into account 'co-ordination' dynamics of changes in pipeline GTS and technological modes of equipment operation. All researches was executed on the high professional level. (authors)

  12. GIS (Geographic Information Systems) based automatic tool for selection of gas pipeline corridors

    Energy Technology Data Exchange (ETDEWEB)

    Matos, Denise F.; Menezes, Paulo Cesar P.; Paz, Luciana R.L.; Garcia, Katia C.; Cruz, Cristiane B.; Pires, Silvia H.M.; Damazio, Jorge M.; Medeiros, Alexandre M.

    2009-07-01

    This paper describes a methodology developed to build total accumulated surfaces in order to better select gas pipelines corridor alternatives. The methodology is based on the minimization of negative impacts and the use of Geographic Information Systems (GIS), allowing an automatic method of construction, evaluation and selection of alternatives, that will contribute to the decision making process. It is important to emphasize that this paper follows the assumptions presented on the research reports of a project sponsored by the Ministry of Mines and Energy (MME) and elaborated at the Electric Power Research Center (CEPEL), called 'Development of a Geographic Information System to Oil and Gas Sectors in Brazil', and also the studies d GTW Project (Gas to Wire). Gas pipelines, as for their linear characteristic, may cross a variety of habitats and settlements, increasing the complexity of their environmental management. Considering this reality, this paper presents a methodology that takes into account different environmental criteria (layers), according to the area impacted. From the synthesis of the criteria it is presented the total accumulated surface. It is showed an example of a hypothetical gas pipeline connection between two points using the total accumulated surface. To select the 'impact scores' of the features, the gas pipeline was considered as a linear feature, but the result is a region, formed by pixels, each pixel with an accumulated impact score lower than some arbitrary measure. This region is called 'corridor', and it is the final result obtained using the proposed methodology. (author)

  13. Financing landfill gas projects

    International Nuclear Information System (INIS)

    Bull, R.

    1992-01-01

    The problems of financing landfill gas projects in the UK in the last few years are discussed. The approach of the author in setting up a company to finance such projects in the power generation field and a separate company to design and supply turnkey packages is reported. (UK)

  14. Fluid-induced vibration of composite natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Zou, G.P.; Cheraghi, N.; Taheri, F. [Dalhousie Univ., Dept. of Civil Engineering, Halifax, NS (Canada)

    2005-02-01

    Advancements in materials bonding techniques have led to the use of reinforced composite pipelines. The use of steel pipe with a fiber-reinforced composite over-wrap together has produced an exceptionally strong pipe with positive advantages in weight and corrosion resistivity. Understanding the dynamic characteristics of this kind of sub-sea composite pipelines, which often accommodate axial flow of gas, and prediction of their response is of great interest. This paper presents a state-variable model developed for the analysis of fluid-induced vibration of composite pipeline systems. Simply supported, clamped and clamped-simply supported pipelines are investigated. The influence of fluid's Poisson ratio, the ratio of pipe radius to pipe-wall thickness, laminate layup, the ratio of liquid mass density to pipe-wall mass density, the fluid velocity, initial tension and fluid pressure are all considered. The results of our proposed methodology are compared with those of finite element analysis, using ANSYS ssoftware. (Author)

  15. Social cost impact assessment of pipeline infrastructure projects

    International Nuclear Information System (INIS)

    Matthews, John C.; Allouche, Erez N.; Sterling, Raymond L.

    2015-01-01

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors

  16. Social cost impact assessment of pipeline infrastructure projects

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, John C., E-mail: matthewsj@battelle.org [Battelle, 7231 Palmetto Dr, Baton Rouge, LA 70808 (United States); Allouche, Erez N., E-mail: allouche@latech.edu [Louisiana Tech University (United States); Sterling, Raymond L., E-mail: sterling@latech.edu [Louisiana Tech University (United States)

    2015-01-15

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

  17. The Trans-Saharan Gas Pipeline: an illusion or a real prospect?; Le trans Saharan Gas Pipeline Mirage ou reelle opportunite?

    Energy Technology Data Exchange (ETDEWEB)

    Auge, B.

    2010-07-01

    The African continent holds 8% of global natural gas reserves. Its relative economic weakness and the almost total absence of natural gas networks means there is very limited internal gas consumption - almost none outside of Algeria and Egypt - giving it considerable exporting capabilities. A pipeline joining up Sub-Saharan Africa with the European Union (EU) is therefore a reasonably logical project in economic terms. The two interested blocks have been discussing this with increasing intensity since early 2000. On the face of it the strategy seems obvious, the European area has three important gas producers: Norway (a non-EU member but closely associated with its energy policy), Great Britain and the Netherlands, with respective outputs of 99.2, 69.5 and 67.5 billion m{sup 3} in 2008. However, Norwegian and Dutch production will begin to decrease in several years time; and British production has already fallen considerably since 2000. Britain currently imports one-third of its gas for domestic consumption (93.9 billion m3 in 2008). Logically EU imports are going to increase progressively. And yet, a fear of dependency on Russian natural gas - currently the average rate of Russian gas supply amongst the EU 27 is 25% - in the near future, is leading the EU to consider diversifying its supply source. Without this diversification Russia could be supplying around 70% of the European market (27 countries) by 2050. Presently some EU countries clearly favour an increase in 're-gasification' plants in order to import more liquefied natural gas (LNG): France, Italy, Spain, the United Kingdom, the Netherlands, and Poland. The Persian Gulf countries, Egypt and Algeria and the U.S. will supply these new plants. The Trans-Saharan Gas Pipeline (TSGP) which would link Nigeria to Niger and Algeria, itself connected to Spain and Italy by existing pipelines or those currently under construction, could turn out to be an additional supply option in the long term. However

  18. Managing risks in the project pipeline.

    Science.gov (United States)

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  19. 77 FR 27048 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Intent To Prepare an Environmental Assessment...

    Science.gov (United States)

    2012-05-08

    ... facilities by Tennessee Gas Pipeline Company, L.L.C. (TGP) in Lafourche Parish, Louisiana. The Commission... proposed project and encourage them to comment on their areas of concern. TGP provided landowners with a... the FERC Web site ( www.ferc.gov ). Summary of the Proposed Project TGP proposes to abandon in place...

  20. 77 FR 31347 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Availability of the Environmental Assessment...

    Science.gov (United States)

    2012-05-25

    ... environmental assessment (EA) for the MPP Project, proposed by Tennessee Gas Pipeline Company, L.L.C. (TGP) in the above-referenced docket. TGP requests authorization to construct and operate 7.9 miles of looped... connection with its evaluation of TGP's Clean Water Act (Section 404) permit application for the MPP Project...

  1. Mechanical properties of steel for construction of gas transfer pipelines and their modification resulting from expanding of gas pipelines during hydraulic pressure testing

    International Nuclear Information System (INIS)

    Kopczynski, A.

    1997-01-01

    There are discussed the mechanical properties of the new generation of steel as per European Standard EN 10208.2: 1996. on the basis of the mechanical parameters of steel the normalized graphs of steel tensioning are presented. Analysis of influence of expanding gas pipelines on changes of steel tensioning graphs were performed. Advantages, resulting from expanding of gas pipelines, were shown. (author)

  2. 77 FR 28331 - Standards for Business Practices for Interstate Natural Gas Pipelines

    Science.gov (United States)

    2012-05-14

    ...] Standards for Business Practices for Interstate Natural Gas Pipelines AGENCY: Federal Energy Regulatory...) applicable to natural gas pipelines. The Commission, however, did not propose to adopt two standards it found... Wholesale Gas Quadrant of the North American Energy Standards Board (NAESB) applicable to natural gas...

  3. 76 FR 28326 - Pipeline Safety: National Pipeline Mapping System Data Submissions and Submission Dates for Gas...

    Science.gov (United States)

    2011-05-17

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR 191... Reports AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Issuance of... Pipeline and Hazardous Materials Safety Administration (PHMSA) published a final rule on November 26, 2010...

  4. Challenges faced on Cacimbas-Catu gas pipeline (Gascac) construction and the technologies applied to achieve success

    Energy Technology Data Exchange (ETDEWEB)

    Ruschi, Allan; Cardos, Celina; Soares, Felipe; Mariot, Guilherme; Loureiro, Regis R [Petroleo Brasileiro S/A, Petrobras Engineering, Rio de Janeiro/ RJ (Brazil)

    2010-07-01

    The GASENE project is the largest gas pipeline constructed in Brazil in the past 10 years, it interconnects the southeast to the northeast of Brazil. The Cacimbas Catu Gas Pipeline (GASCAC) is a part of the project; it has a 28 inch diameter and is 958 km long. The aim of this paper is to present the construction and assembly process undertaken to meet the deadline and complete the GASCAC to a high quality standard. The main challenges of this project were its length, the short period for completion and the numerous geological and man-made features along the pipeline route. To overcome these difficulties, technologies that had never been used in Brazil before were employed, such as vacuum pipe lifting, bag weights and automatic welding. The GASCAC project was completed in time and with to a high standard of quality, demonstrating that strategic planning and the use of new technologies can increase productivity, quality and safety.

  5. Application of Fracture-Mechanics Approach to Gas Pipelines

    Czech Academy of Sciences Publication Activity Database

    Gajdoš, Lubomír; Šperl, Martin

    VII, č. 73 (2011), s. 480-487 ISSN 2010-376X R&D Projects: GA ČR(CZ) GAP105/10/2052; GA ČR(CZ) GPP105/10/P555 Grant - others:GAMPO(CZ) FT-TA5/076 Program:FT Institutional research plan: CEZ:AV0Z20710524 Keywords : axial crack * fracture-mechanics * J integral * pipeline wall Subject RIV: JL - Materials Fatigue, Friction Mechanics

  6. Planning international transit oil pipeline projects in Croatia

    International Nuclear Information System (INIS)

    Sekulic, G.; Vrbic, D.

    2004-01-01

    Planning and development of international oil pipeline projects are aimed primarily at enhancing the safety of crude oil supply. Pipeline development is affected by a variety of overlapping factors, such as energy - and environment-protection-related factors, as well as political, economic, legislative, social, technical and technological ones. The success of any pipeline planning, construction and operation in the present conditions will depend upon the degree to which the above factors have been brought in line with global trends. The government should create stable political, economic and legislative frameworks that will meet the global requirements of crude oil transport development. As regards (new) transportation companies, their function is to secure safe transport by providing competitive tariffs and granting environmental protection. A prerequisite for the pipeline planning is to have both major crude oil consumers and producers (as well as their economic and political integrations) consider any state or company as potential partners for crude oil transport and transit, respectively. Croatia and the JANAF transport company have been 'chosen' as one of priority routes for European supply with crude oil from the Caspian region and Russia and one of the directions for Russian crude oil export due to a number of advantages, opportunities and prospects for a successful development. Two international oil pipeline projects - the Druzba Adria Project and the Constanta-Pancevo-Omisalj-Trieste Project - are currently under consideration. The government commitment towards these projects has been documented by the Croatian Energy Development Strategy (April 2002) and by the Programme for its implementation (March 2004). JANAF has assumed the responsibility for carrying out the project preparation activities assigned to it by the Croatian Government and the pertinent ministries. Cooperation between JANAF and government institutions is an integral part of the procedure

  7. Leak in spiral weld in a 16 inches gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Fazzini, Pablo G; Bona, Jeremias de [GIE S.A., Mar del Plata (Argentina); Otegui, Jose L [University of Mar del Plata (Argentina)

    2009-07-01

    This paper discusses a failure analysis after a leak in the spiral weld of a 16 inches natural gas pipeline, in service since 1974. The leak was the result of the coalescence of two different defects, on each surface of the pipe wall, located in the center of the inner cord of the helical DSAW weld. Fractographic and metallographic studies revealed that the leak was a combination of three conditions. During fabrication of the pipe, segregation in grain boundary grouped in mid weld. During service, these segregations underwent a process of selective galvanic corrosion. One of these volumetric defects coincided with a tubular pore in the outer weld. Pigging of the pipeline in 2005 for cleaning likely contributed to the increase of the leak flow, when eliminating corrosion product plugs. Although these defects are likely to repeat, fracture mechanics shows that a defect of this type is unlikely to cause a blowout. (author)

  8. Residue management in the Bolivia-Brazil gas pipeline construction

    International Nuclear Information System (INIS)

    Freitas, Eduardo Lopes; Henrique, Paulo Roberto Pereira; Cantarino, Anderson Americo Alves

    2000-01-01

    The construction of the gas pipeline is a process sequential of assembly phases, where each one of those phases generates residues of the most varied types and amounts, being necessary the forecast of your generation in agreement with the activity that is being executed. During the accomplishment of the works they are generated a lot of times situations where are observed the inadequate disposition of the residues. Those practices, besides the environmental impact that they cause, it can cart in the future, the need of additional investments be proceeded in the recovery of the areas and removal of the residues. This work presents the Program of administration of Residues instituted during the construction of the pipeline Bolivia - Brazil, seeking, on a side to reduce to the minimum the generation of residues and of the other, moths handling guidelines and disposition, in way to minimize the environmental impacts caused by the same ones. (author)

  9. Vale do Aco pipeline: pipeline natural gas implementation in ArcelorMittal Monlevade steel work; Gasoduto Vale do Aco: implantacao do gas natural via gasoduto na ArcelorMittal Monlevade

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Eduardo Sergio da Silva; Arantes, Luiz Flavio Mourao; Ribeiro, Vicente Aleixo Pinheiro [ArcelorMittal Monlevade, Joao Monlevade, MG (Brazil)

    2011-12-21

    Since September 2010, ArcelorMittal Monlevade has gained flexibility and an important opportunity to reduce the cost of its energy mix due to the arrival of the Natural Gas (NG) via Steel Valley Pipeline. The proposal of the project included the substitution of the Liquefied Petroleum Gas (LPG), Fuel Oil and Compressed Natural Gas for natural gas via pipeline. To support the investment decision, in addition to domestic economic and technical aspects, the macro economic environment concerning the NG was also taken into account. This paper shows the analysis for adjustment of internal equipment, the structure of the contract, the conceptual project of the gas distribution built inside the main events, the gains achieved, the alternatives for the acquisition of NG and operational flexibility of ArcelorMittal Monlevade in case of interruption of supply of natural gas. (author)

  10. A new algorithm predicts pressure and temperature profiles of gas/gas-condensate transmission pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mokhatab, Saied [OIEC - Oil Industries' Engineering and Construction Group, Tehran (Iran, Islamic Republic of); Vatani, Ali [University of Tehran (Iran, Islamic Republic of)

    2003-07-01

    The main objective of the present study has been the development of a relatively simple analytical algorithm for predicting flow temperature and pressure profiles along the two-phase, gas/gas-condensate transmission pipelines. Results demonstrate the ability of the method to predict reasonably accurate pressure gradient and temperature gradient profiles under operating conditions. (author)

  11. Condensation in gas transmission pipelines. Phase behavior of mixtures of hydrogen with natural gas

    Energy Technology Data Exchange (ETDEWEB)

    Schouten, J.A.; Michels, J.P.J. [Amsterdam Univ. (Netherlands). Van der Waals-Zeeman Inst.; Rosmalen, R.J. van [Energy, Roden (Netherlands)

    2005-05-01

    Several pressure and temperature reductions occur along gas transmission lines. Since the pressure and temperature conditions of the natural gas in the pipeline are often close to the dew point curve, liquid dropout can occur. Injection of hydrogen into the natural gas will change the phase envelope and thus the liquid dropout. This condensation of the heavy hydrocarbons requires continuous operational attention and a positive effect of hydrogen may affect the decision to introduce hydrogen. In this paper we report on calculations of the amount of condensate in a natural gas and in this natural gas mixed with 16.7% hydrogen. These calculations have been performed at conditions prevailing in gas transport lines. The results will be used to discuss the difference in liquid dropout in a natural gas and in a mixture with hydrogen at pressure reduction stations, at crossings under waterways, at side-branching, and at separators in the pipelines. (author)

  12. Tunnel construction used as solution for the Cabiunas-REDUC-3 gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    D' Oliveira, Celso A.; Teixeira, Andre N. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The construction of tunnels for pipeline routes has started being adopted as a solution for technical, environmental and safety issues in the oil and gas industry. Although it is not yet a common practice, PETROBRAS decided to use this type of construction on part of 178 extension kilometers of the main line for the Cabiunas-REDUC-3 Gas Pipeline located in the Gavioes mountains in the district of Cachoeiras de Macacu (RJ). The project implementation follows a growing trend of combining efficiency and environmental protection during its execution. Because the region is full of steep grades and is located in an environmentally sensitive area, the use of a tunnel connection removes some of the risks associated with that type of terrain. Among the many technical challenges involved in the project, one must include: access through dense forest, moving personnel, building material and equipment over step terrain and providing protection from corrosion. And as far as protecting the environment is concerned, the use of a pipeline results in a significant reduction in the loss of native vegetation and damage to the ecosystem. To increase these advantages, PETROBRAS seeks to adopt the kinds of construction methods that are most adequate for the challenge at hand, while producing the best results for the project. Whether using new or tried-and-true methods, the focus is always on perfecting the quality of service provided. (author)

  13. Z662-96: oil and gas pipeline systems; 2. ed.

    Energy Technology Data Exchange (ETDEWEB)

    Ko, S; Burford, G; Martin, A; Adragna, M [eds.

    1997-12-31

    This Standard is part of the pipeline systems and materials segment of the Canadian Standards Association (CSA)`s Transportation program. It covers the design, construction, operation and maintenance of oil and gas industry pipeline systems that carry (1) liquid hydrocarbons, including crude oil, multiphase fluids, condensate, liquid petroleum products, natural gas liquids, and liquefied petroleum gas, (2) oilfield water, (3) oilfield steam, (4) carbon dioxide used in oilfield enhanced recovery schemes, or (5) natural gas, manufactured gas, or synthetic gas. tabs. figs.

  14. Strategy and use of pipelined natural gas in Brazil: the case of Rio de Janeiro State

    International Nuclear Information System (INIS)

    Rodrigues, M.G.

    1991-01-01

    The systems of energy distribution by pipelined fuel gas in the residential sector of the state of Rio de Janeiro is analyzed. It studies the potential market for the expansion of pipelined gas and its distribution in urban areas, and presents as well commentaries and recommendation on energy policy for the use of natural gas. (author)

  15. 78 FR 19409 - Annual Charge Filing Procedures for Natural Gas Pipelines

    Science.gov (United States)

    2013-04-01

    ...; Order No. 776] Annual Charge Filing Procedures for Natural Gas Pipelines AGENCY: Federal Energy... Commission (Commission or FERC) is amending its regulations to revise the filing requirements for natural gas...) clause. Currently, natural gas pipelines utilizing an ACA clause must make an annual tariff filing to...

  16. 75 FR 36615 - Pipeline Safety: Information Collection Gas Distribution Annual Report Form

    Science.gov (United States)

    2010-06-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-RSPA-2004-19854] Pipeline Safety: Information Collection Gas Distribution Annual Report Form AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Request...

  17. The Vulnerability Formation Mechanism and Control Strategy of the Oil and Gas Pipeline City

    Science.gov (United States)

    Chen, Y. L.; Han, L.

    2017-12-01

    Most of the pipelines of oil and gas pipelines in our country have been for more than 25 years. These pipes are buried underground and was difficult to daily test. In addition, it was vulnerable to environmental, corrosion and natural disasters, So there is a hidden nature of accidents. The rapid development of urbanization, population accumulation, dense building and insufficient safety range are all the reasons for the frequent accidents of oil and gas pipelines. Therefore, to appraise and know the safe condition of the city various regions oil and gas pipelines is vital significant. In order to ensure the safety of oil and gas pipeline city, this paper defines the connotation of oil and gas pipeline city vulnerability according to the previous research on vulnerability. Then from three perspectives of environment, structure and behavior, based on the analytical paradigm of “structure—vulnerability conduct—performance” about oil and gas, the influential indicators of vulnerable oil and gas pipelines were analysed, the vulnerability mechanism framework of Oil and gas pipeline city was also constructed. Finally, the paper proposed the regulating strategy of the vulnerability of the oil and gas pipeline city to decrease its vulnerability index, which can be realize the city’s vulnerability evaluation and provides new ideas for the sustainable development of the city.

  18. Plan of gas; the technique of transforming oil pipelines into gas pipeline

    International Nuclear Information System (INIS)

    Carta Petrolera

    1998-01-01

    The discovery, development and commercialization of a high one number of gas deposits with big reserves, guided to establish the National Plan, for massive use for gas, whose social objective is the of arriving with this clean and economic fuel to all the places of the country

  19. Fatigue assessment of a double submerged arc welded gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Fazzini, Pablo; Otegui, Jose Luis [Universidad Nacional Mar del Plata, Mar del Plata (Argentina). Instituto de Ciencia y Tecnologia de Materiales (INTEMA); Teutonico, Mauricio; Manfredi, Carlos [GIE S.A., Mar del Plata (Argentina)

    2005-07-01

    An uncommon blowout in a 24'' diameter, 7 mm thick API 5L X52 gas pipeline was due to fracture at the longitudinal double submerged arc weld. Oddly enough for gas pipelines, it was found that fatigue cracks had propagated from a large embedded weld defect of lack of fusion resulting from severe geometrical mismatch between inner and outer weld passes. What makes this failure particularly interesting is that: previous in line inspections failed to detect any defect, no evidence of third party damage was found, and very few large pressure cycles had been recorded during the last 5 years of service, which were believed to be representative of the entire service life of the pipeline. Fatigue tests were carried out to characterize propagation of fatigue cracks in weld metal, it was found that a large Paris exponent made the few large amplitude cycles most contributing to crack propagation. Crack growth path and striation patterns were studied. Fatigue growth was modelled by integrating experimental results and by extrapolating striation spacing in the fracture surface of the failed pipe. Crack growth path and striation patterns were studied. It was found that microstructure discontinuities govern propagation at low {delta}K, but one striation per cycle was produced at large {delta}K, due to a mostly ductile propagation mode. Fatigue growth was modelled by integrating experimental results and by extrapolating striation spacing in the fracture surface of the failed pipe. It was found that in the early life of the line many more large pressure cycles than expected had occurred. Good correspondence between predicted and actual fatigue lives was in this way obtained (author)

  20. Fatigue assessment of a double submerged arc welded gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Fazzini, Pablo; Otegui, Jose Luis [Universidad Nacional Mar del Plata, Mar del Plata (Argentina). Instituto de Ciencia y Tecnologia de Materiales (INTEMA); Teutonico, Mauricio; Manfredi, Carlos [GIE S.A., Mar del Plata (Argentina)

    2005-07-01

    An uncommon blowout in a 24'' diameter, 7 mm thick API 5L X52 gas pipeline was due to fracture at the longitudinal double submerged arc weld. Oddly enough for gas pipelines, it was found that fatigue cracks had propagated from a large embedded weld defect of lack of fusion resulting from severe geometrical mismatch between inner and outer weld passes. What makes this failure particularly interesting is that: previous in line inspections failed to detect any defect, no evidence of third party damage was found, and very few large pressure cycles had been recorded during the last 5 years of service, which were believed to be representative of the entire service life of the pipeline. Fatigue tests were carried out to characterize propagation of fatigue cracks in weld metal, it was found that a large Paris exponent made the few large amplitude cycles most contributing to crack propagation. Crack growth path and striation patterns were studied. Fatigue growth was modelled by integrating experimental results and by extrapolating striation spacing in the fracture surface of the failed pipe. Crack growth path and striation patterns were studied. It was found that microstructure discontinuities govern propagation at low {delta}K, but one striation per cycle was produced at large {delta}K, due to a mostly ductile propagation mode. Fatigue growth was modelled by integrating experimental results and by extrapolating striation spacing in the fracture surface of the failed pipe. It was found that in the early life of the line many more large pressure cycles than expected had occurred. Good correspondence between predicted and actual fatigue lives was in this way obtained (author)

  1. Data summary report on short-term turbidity monitoring of pipeline river crossings in the Moyie River, Boundary County, Idaho: PGT-PG&E Pipeline Expansion Project

    Energy Technology Data Exchange (ETDEWEB)

    Gowdy, M.J.; Smits, M.P.; Wilkey, P.L.; Miller, S.F.

    1994-03-01

    A water-quality monitoring program was implemented for Bechtel Corporation to measure the short-term increases in turbidity in the Moyie River caused by construction activities of the Pacific Gas Transmission-Pacific Gas & Electric Pipeline Expansion Project. Construction of the buried, 42-in.-diameter, steel pipeline, during the summer of 1992, involved eight wet crossings of the Moyie River along the 13-mi section of pipeline immediately south of the Canadian-United States border in Boundary County, Idaho. This report summarizes the sampling and analysis protocol used and gives the results and observations for each of the eight crossings. The data obtained from this monitoring program, in addition to satisfying regulatory requirements for the Pipeline Expansion Project, will contribute to an ongoing long-term study of the Moyie River crossings being performed for the Gas Research Institute by Argonne National Laboratory. The purpose of this document is strictly limited to reporting the results of the monitoring program. Interpretation of the data is not within the scope of this report.

  2. Major gas projects in Latin America. Issues and perspectives

    International Nuclear Information System (INIS)

    Khelil, C.

    1997-01-01

    The Latin American energy demand will reach 677 MTOE by 2010, a 50% increase over 1995. There will be a major shift towards use of natural gas in power generation. US 503 10 9 Dollars will be required over 1995-2010 to discover and develop hydrocarbon reserves, build the pipeline system as well as generate and distribute electricity. US 19 10 9 Dollars will be required for gas pipelines and LNG projects in the region. Improvements in the policy, legal and regulatory framework are required in many countries to attract the needed investments. Several major gas projects are being implemented or planned in the region: Colombia Enron-built pipeline, Peru Camisea project, Chile Nova gas pipeline from Argentina, the Bolivia-Brazil pipeline and others. The World Bank group has been assisting countries in developing a competitive business environment and can provide, when needed, comfort to lenders in project financing through a guarantee scheme in several large complex cross border projects. (au)

  3. Remote laser detection of natural gas leakages from pipelines

    International Nuclear Information System (INIS)

    Petukhov, V O; Gorobets, V A; Andreev, Yu M; Lanskii, G V

    2010-01-01

    A differential absorption lidar based on a tunable TEA CO 2 laser emitting at 42 lines of the 'hot' 01 1 1 - 11 1 0 band in the range from 10.9 to 11.4 μm is developed for detecting natural gas leakages from oil pipelines by measuring the ethane content in the atmosphere. The ethane detection sensitivity is 0.9 ppm km. The presence of methane does not distort the measurement results. The developed lidar can detect the natural gas leakage from kilometre heights at the flying velocities up to 200 km h -1 and a probe pulse repetition rate of 5 Hz. (laser applications and other topics in quantum electronics)

  4. Legal and regulatory possibility of connection between interstate natural gas distribution networks instead of constructing transport pipelines; Possibilidade juridoco-regulatoria da conexao interestadual entre redes de distribuicao de gas natural como alternativa a construcao de gasodutos de transporte

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Gustavo Mano [Andrade, Mano - Advogados, Rio de Janeiro, RJ (Brazil)

    2012-07-01

    According to Revista Brasil Energia (2011a), the local natural gas distribution concessionaire in the State of Sao Paulo Gas Brasiliano Distribuidora - GBD, plans to expand its distribution pipeline network in western Sao Paulo up to the border of the State of Minas Gerais, near the region known as Minas Triangle where a connection with the pipeline network of the State of Minas Gerais' natural gas distribution company, Companhia de Gas de Minas Gerais - GASMIG shall be built in order to supply natural gas to an ammonia plant to be built by PETROBRAS in the City of Uberaba. Still according to the publication, the project described above would be an alternative to the construction of a transportation pipeline that, since the enforcement of the Gas Law - Law No. 11.909/09 (Brasil, 2009), should be subject to concession contracts preceded by a complex, and probably delayed, planning and procurement. However, there is a transportation pipeline project, deriving from the Bolivia-Brazil transportation pipeline near the city of Sao Carlos, in Sao Paulo, crossing the Minas Triangle and finishing in the State of Goias. This project is owned by TGBC Company. The existence of two gas pipeline projects with very similar paths to supply virtually the same regions and based on different regulatory frameworks, one consisting of a connection between the distribution networks of different States and another based on the concept of pipeline transportation of gas under the legal and regulatory federal jurisdiction raises the discussion about the possibility of legal and regulatory interstate connections of distribution pipeline networks as an alternative to planning, allocation and construction of a transportation pipelines. This article aims to examine the legal and regulatory foundations of both alternatives and delineate the limits of performance of States and Federal Government on legislation and regulation concerning the movement of natural gas pipeline through the Country

  5. 75 FR 64303 - Tennessee Gas Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2010-10-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-23-000] Tennessee Gas Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned Northeast Upgrade Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings October 8, 2010. The staff of the Federal Energy...

  6. 76 FR 41788 - Southern Star Central Gas Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment...

    Science.gov (United States)

    2011-07-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. CP11-481-000] Southern Star... Southern Star Central Gas Pipeline, Inc. (Southern Star) in Rice County, Kansas. This EA will be used by... Facility On My Land? What Do I Need To Know?'' was attached to the project notice Southern Star provided to...

  7. Pipeline cost reduction through effective project management and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada Pipeline Ltd., Alberta (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada); Murray, M.A. [National Energy Board of Canada (Canada)

    2005-07-01

    Pipelines are regarded by many as passive structures with the technology involved in their construction and operation being viewed as relatively simple and stable. If such is the case how can there be much room for cost improvement? In reality, there have been many technological and regulatory innovations required within the pipeline industry to meet the challenges posed by ever increasing consumer demand for hydrocarbons, the effects of aging infrastructure and a need to control operating and maintenance expenditures. The importance of technology management, as a subset of overall project management, is a key element of life cycle cost control. Assurance of public safety and the integrity of the system are other key elements in ensuring a successful pipeline project. The essentials of best practise project management from an owner/ operator's perspective are set out in the paper. Particular attention is paid to the appropriate introduction of new technology, strategic procurement practice and material selection, indicating that capital cost savings of up to 15% are achievable without harming life cycle cost. The value of partnering leading to technical innovation, cost savings and improved profitability for all the participants is described. Partnering also helps avoid duplicated effort through the use of common tools for design, planning schedule tracking and reporting. Investing in appropriate technology development has been a major source of cost reduction in recent years and the impact of a number of these recently introduced technologies in the areas of materials, construction processes and operation and maintenance are discussed in the paper. (author)

  8. Loading and stress analysis of gas pipeline structures; Analise de esforcos e tensoes em estruturas de gasodutos durante despressurizacoes

    Energy Technology Data Exchange (ETDEWEB)

    Frisoli, Caetano [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil); Frota, Cristiane Souto [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil); Silva, Luis Fernando Figueira da; Carvalho, Marcio da Silveira [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Engenharia Mecanica; Savi, Marcelo Amorim [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia. Dept. de Engenharia Mecanica; Pacheco, Pedro Manuel Calas Lopes [Centro Federal de Educacao Tecnologica do Rio de Janeiro (CEFET-RJ), Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Repairing and maintenance activities on Bolivia-Brazil gas pipeline often need blow down lines. During the blow down process, the high speed of discharging gases imposes great efforts to the structures. A detailed analysis of this situation is essential for a safe operation. This paper describes two phases of a project, developed under TBG coordination. It consists in analyzing the stress and forces involved in this operation, in order to design facilities to blow down pipes and develop a safe blow down procedure for the gas pipeline. The first phase consists of a supersonic flowing simulation in the blow down gas pipeline device. The pressure behavior, mass flow and the speed at the device's ending point are calculated for different operational conditions. In the second phase, the equivalent loading caused by blow down operations is used as input in a stress analysis program to determine stress, critical sessions evaluation and material recommendations for blow down devices. (author)

  9. Thinking on Sichuan-Chongqing gas pipeline transportation system reform under market-oriented conditions

    Science.gov (United States)

    Duan, Yanzhi

    2017-01-01

    The gas pipeline networks in Sichuan and Chongqing (Sichuan-Chongqing) region have formed a fully-fledged gas pipeline transportation system in China, which supports and promotes the rapid development of gas market in Sichuan-Chongqing region. In the circumstances of further developed market-oriented economy, it is necessary to carry out further the pipeline system reform in the areas of investment/financing system, operation system and pricing system to lay a solid foundation for improving future gas production and marketing capability and adapting itself to the national gas system reform, and to achieve the objectives of multiparty participated pipeline construction, improved pipeline transportation efficiency and fair and rational pipeline transportation prices. In this article, main thinking on reform in the three areas and major deployment are addressed, and corresponding measures on developing shared pipeline economy, providing financial support to pipeline construction, setting up independent regulatory agency to enhance the industrial supervision for gas pipeline transportation, and promoting the construction of regional gas trade market are recommended.

  10. Multi objective optimization of line pack management of gas pipeline system

    International Nuclear Information System (INIS)

    Chebouba, A

    2015-01-01

    This paper addresses the Line Pack Management of the ''GZ1 Hassi R'mell-Arzew'' gas pipeline. For a gas pipeline system, the decision-making on the gas line pack management scenarios usually involves a delicate balance between minimization of the fuel consumption in the compression stations and maximizing gas line pack. In order to select an acceptable Line Pack Management of Gas Pipeline scenario from these two angles for ''GZ1 Hassi R'mell- Arzew'' gas pipeline, the idea of multi-objective decision-making has been introduced. The first step in developing this approach is the derivation of a numerical method to analyze the flow through the pipeline under transient isothermal conditions. In this paper, the solver NSGA-II of the modeFRONTIER, coupled with a matlab program was used for solving the multi-objective problem

  11. Slovakia should be more active in pipeline projects

    International Nuclear Information System (INIS)

    Hirman, K.

    2004-01-01

    European Union is interested also like USA to lower its own dependence on oil distributors from problematic region of Persian Gulf. Therefore the attention is turning on to Russia and to region of Caspian Sea. However except political and safety problems the import of oil from these territories meets also the lack of transport capacities. Slovakia can become the important transit territory, where could flow more Russian or Caspian oil to the European market. After a break-up of Soviet Union Russia lost oil export terminals on the coast of Baltic Sea. These terminals became a part of territories of three independent Baltic countries. The frequent storms in the region of Novorossiysk are disadvantage of Black Sea's ports Novorossiysk and Tuapse. The overloading of Turkish straits Bospor and Dardanely, which connect Black Sea and Mediterranean Sea, is becoming a new and more serious problem. In the present time up to 500 tankers swim over through these straits annually, which transport together around 70 million tones of oil and of oil products. Owing to the rising mining of oil the only one way out is the circumvention of these straits. New pipeline from Baku through Georgia to Turkish terminal Ceyhan on the coast of Mediterranean Sea is the only one but not sufficient solution. Therefore Russia promotes the project of integration of pipelines Druzba and Adria. The intensions is to open the continuous export pipeline way through Belarus, Ukraine, Slovakia and Hungary into Croatian terminal Omisajl on the coast of Adriatic Sea. Other possibility how to rise the oil transit through Slovakia is the construction of pipeline to the refinery OMW in Schweechat near Vienna. In the end of the last year the representatives of Transpetrol, Yukos and OMW signed the contract of its construction in Bratislava. Annual capacity of this pipeline is 2 million tonnes of oil. Other possibility how to transport the Caspian oil is pipeline Odessa-Brody. More then 600 km of this pipeline

  12. Analysis of the strength of sea gas pipelines of positive buoyancy conditioned by glaciation

    Science.gov (United States)

    Malkov, Venyamin; Kurbatova, Galina; Ermolaeva, Nadezhda; Malkova, Yulia; Petrukhin, Ruslan

    2018-05-01

    A technique for estimating the stress state of a gas pipeline laid along the seabed in northern latitudes in the presence of glaciation is proposed. It is assumed that the pipeline lies on the bottom of the seabed, but under certain conditions on the some part of the pipeline a glaciation is formed and the gas pipeline section in the place of glaciation can come off the ground due to the positive buoyancy of the ice. Calculation of additional stresses caused by bending of the pipeline is of practical interest for strength evaluation. The gas pipeline is a two-layer cylindrical shell of circular cross section. The inner layer is made of high-strength steel, the outer layer is made of reinforced ferroconcrete. The proposed methodology for calculating the gas pipeline for strength is based on the equations of the theory of shells. The procedure takes into account the effect of internal gas pressure, external pressure of sea water, the weight of two-layer gas pipeline and the weight of the ice layer. The lifting force created by the displaced fluid and the positive buoyancy of the ice is also taken into account. It is significant that the listed loads cause only two types of deformation of the gas pipeline: axisymmetric and antisymmetric. The interaction of the pipeline with the ground as an elastic foundation is not considered. The main objective of the research is to establish the fact of separation of part of the pipeline from the ground. The method of calculations of stresses and deformations occurring in a model sea gas pipeline is presented.

  13. Evaluation of stream crossing methods prior to gas pipeline construction

    International Nuclear Information System (INIS)

    Murphy, M.H.; Rogers, J.S.; Ricca, A.

    1995-01-01

    Stream surveys are conducted along proposed gas pipeline routes prior to construction to assess potential impacts to stream ecosystems and to recommend preferred crossing methods. Recently, there has been a high level of scrutiny from the Public Service Commission (PSC) to conduct these stream crossings with minimal effects to the aquatic community. PSC's main concern is the effect of sediment on aquatic biota. Smaller, low flowing or intermittent streams are generally crossed using a wet crossing technique. This technique involves digging a trench for the pipeline while the stream is flowing. Sediment control measures are used to reduce sediment loads downstream. Wider, faster flowing, or protected streams are typically crossed with a dry crossing technique. A dry crossing involves placing a barrier upstream of the crossing and diverting the water around the crossing location. The pipeline trench is then dug in the dry area. O'Brien and Gere and NYSEG have jointly designed a modified wet crossing for crossing streams that exceed maximum flows for a dry crossing, and are too wide for a typical wet crossing. This method diverts water around the crossing using a pumping system, instead of constructing a dam. The trench is similar to a wet crossing, with sediment control devices in place upstream and downstream. If streams are crossed during low flow periods, the pumping system will be able to reduce the majority of water flow and volume form the crossing area, thereby reducing ecological impacts. Evaluation of effects of this crossing type on the stream biota are currently proposed and may proceed when construction begins

  14. The Trans-Saharan Gas Pipeline: an illusion or a real prospect?

    International Nuclear Information System (INIS)

    Auge, B.

    2010-01-01

    The African continent holds 8% of global natural gas reserves. Its relative economic weakness and the almost total absence of natural gas networks means there is very limited internal gas consumption - almost none outside of Algeria and Egypt - giving it considerable exporting capabilities. A pipeline joining up Sub-Saharan Africa with the European Union (EU) is therefore a reasonably logical project in economic terms. The two interested blocks have been discussing this with increasing intensity since early 2000. On the face of it the strategy seems obvious, the European area has three important gas producers: Norway (a non-EU member but closely associated with its energy policy), Great Britain and the Netherlands, with respective outputs of 99.2, 69.5 and 67.5 billion m 3 in 2008. However, Norwegian and Dutch production will begin to decrease in several years time; and British production has already fallen considerably since 2000. Britain currently imports one-third of its gas for domestic consumption (93.9 billion m3 in 2008). Logically EU imports are going to increase progressively. And yet, a fear of dependency on Russian natural gas - currently the average rate of Russian gas supply amongst the EU 27 is 25% - in the near future, is leading the EU to consider diversifying its supply source. Without this diversification Russia could be supplying around 70% of the European market (27 countries) by 2050. Presently some EU countries clearly favour an increase in 're-gasification' plants in order to import more liquefied natural gas (LNG): France, Italy, Spain, the United Kingdom, the Netherlands, and Poland. The Persian Gulf countries, Egypt and Algeria and the U.S. will supply these new plants. The Trans-Saharan Gas Pipeline (TSGP) which would link Nigeria to Niger and Algeria, itself connected to Spain and Italy by existing pipelines or those currently under construction, could turn out to be an additional supply option in the long term. However, if this 4,128 km

  15. Cost Minimization Model of Gas Transmission Line for Indonesian SIJ Pipeline Network

    Directory of Open Access Journals (Sweden)

    Septoratno Siregar

    2003-05-01

    Full Text Available Optimization of Indonesian SIJ gas pipeline network is being discussed here. Optimum pipe diameters together with the corresponding pressure distribution are obtained from minimization of total cost function consisting of investment and operating costs and subjects to some physical (Panhandle A and Panhandle B equations constraints. Iteration technique based on Generalized Steepest-Descent and fourth order Runge-Kutta method are used here. The resulting diameters from this continuous optimization are then rounded to the closest available discrete sizes. We have also calculated toll fee along each segment and safety factor of the network by determining the pipe wall thickness, using ANSI B31.8 standard. Sensitivity analysis of toll fee for variation of flow rates is shown here. The result will gives the diameter and compressor size and compressor location that feasible to use for the SIJ pipeline project. The Result also indicates that the east route cost relatively less expensive than the west cost.

  16. Nord stream: not just a pipeline. An analysis of the political debates in the Baltic Sea region regarding the planned gas pipeline from Russia to Germany

    Energy Technology Data Exchange (ETDEWEB)

    Whist, Bendik Solum

    2008-11-15

    This report is an analysis of the planned gas pipeline from Russia to Germany through the Baltic Sea known as Nord Stream. Although not yet realised, the project has, since its birth, been the subject of harsh criticism and opposition by a significant number of states that consider themselves affected by the pipeline. Whereas the Baltic States and Poland have interpreted the pipeline as a politically motivated strategy that will increase Russia's leverage on them and threaten their energy security, the debate in Sweden was at first mostly concerned with the prospect of increased Russian military presence in the Swedish Exclusive Economic Zone. The potential environmental impact of the pipeline has been, and continues to be, an overarching concern shared by all the littoral states of the Baltic Sea. Proponents of Nord Stream, most notably Germany, Russia and the Nord Stream consortium, have largely dismissed the concerns as unwarranted and argue that the pipeline is a common European project that all EU-members should embrace, as it will provide much-needed gas to an increasingly energy-thirsty union. This report is an extensive study of the divergent attitudes and debates that have surged in the region regarding Nord Stream, and the aim is to provide plausible explanations as to why the interpretations of the project have been so different in the various states. The report is based on a variety of sources, including several first-hand interviews with researchers and government officials in the Baltic Sea region. (author). refs.,fig.,tabs

  17. Transient dynamic crack propagation in gas pressurised pipelines

    International Nuclear Information System (INIS)

    Caldis, E.S.; Owen, D.R.J.; Taylor, C.

    1983-01-01

    The prime limitation of dynamic fracture analysis is the lack of a fundamental crack advance theory which can be easily and economically adopted for use with numerical models. The necessity for the inclusion of inertia effects in the solution of certain problem classes is now evident, but most transient dynamic fracture models considered to date include (of necessity) some intuitive/empirical parameters with a frequent need of a priori knowledge of experimental solutions. The particular problem considered in this study is Mode I transient dynamic crack propagation in gas pressurised pipelines. The steel pipe is modelled using thin shell Semiloof finite elements and its transient response is coupled to a one-dimensional finite element model of the compressible gas equations, incorporating a lateral gas flow parameter. The pipe is governed by the usual dynamic equilibrium equation which is discretised in the time domain by a central difference explicit algorithm. The compressible gas response is modelled by the Continuity and Momentum equations and time discretisation is performed by means of a fully backward difference scheme in time. (orig./GL)

  18. The blind faith deep water horizontal pipeline tie-in project

    Energy Technology Data Exchange (ETDEWEB)

    Charalambides, John Nicos [Oceaneering International, Inc., Houston, TX (United States)

    2009-12-19

    This presentation will concentrate on the design challenges, experience and learning from the SIT and offshore installation of two deepwater pipeline tie-ins using first-of-its-kind subsea technology and installation methodologies on the 'Blind Faith' project. The Blind Faith Subsea Tie-Ins join the Blind Faith oil and gas pipelines with the Canyon Chief gas pipeline and the Mountaineer oil pipeline in 5100 feet of water. Both of the Blind Faith oil and gas pipelines are terminated with conventional PLEMs providing a horizontal connector for the tie-in and a vertical connector for a future tie-in connection point. The connectors are ROV operable/installable clamp style connectors. The method of joining to the Canyon Chief oil and gas pipelines and the type of jumper employed are unique to the tie-in. An ROV operable / installable mechanical pipe end connector connects the bare ends of the Canyon Chief and Mountaineer pipelines. The mechanical pipe end connector is fitted with an integral clamp connector hub and rests on an ROV installed mud mat. After installation of the mechanical connector, metrology was performed to create a neutral state horizontal jumper for joining the mechanical connector hub and the Blind Faith PLEM. The neutral state horizontal jumper is a compliant 'Z-Bend' design. During installation the jumper was elastically pre-deformed using a bowstring system. Pre-deformation of the jumper provided installation clearances and facilitated the neutral stress state after installation. Once landed the jumper bowstring was relaxed, allowing the jumper to expand to fit between the hubs. After expansion and make-up, the clamp connectors were tightened via an ROV operated hydraulic torque wrench. A seal test verified the integrity of the connections. After installation the jumper remains in a minimal residual stress state atypical of most horizontal jumpers. The horizontal jumper was chosen over the vertical jumper because it provides a

  19. Corrosion Prevention And Control In High Pressure Oil And Gas Transmission Pipelines

    International Nuclear Information System (INIS)

    Hafez, M.T.; Radwan, M.H.; Jones, D.G.

    2004-01-01

    At the start of the 1990s there were concerns over the increasing threat of corrosion to the integrity of high-pressure oil and gas transmission pipelines. For example: corrosion was the major cause of reportable incidents in North America (1]. Corrosion was the major cause of pipeline failure in the Gulf of Mexico [2]. Corrosion in a North American onshore oil pipeline had required over $1 billion in repairs(3]. Internal corrosion along the complete length of pipelines had resulted in replacement[4] . However, the worldwide published failure statistics indicate that the incidents of corrosion are not increasing year on year(5-9]. Indeed, CONCA WE[8,9] statistics (for pipelines In Western Europe) show that the failure rate from corrosion (the most likely failure mode with increasing age) has not increased with pipeline age (Figure 1). In fact the statistics for gas pipelines in Europe

  20. A method of quantitative risk assessment for transmission pipeline carrying natural gas

    International Nuclear Information System (INIS)

    Jo, Young-Do; Ahn, Bum Jong

    2005-01-01

    Regulatory authorities in many countries are moving away from prescriptive approaches for keeping natural gas pipelines safe. As an alternative, risk management based on a quantitative assessment is being considered to improve the level of safety. This paper focuses on the development of a simplified method for the quantitative risk assessment for natural gas pipelines and introduces parameters of fatal length and cumulative fatal length. The fatal length is defined as the integrated fatality along the pipeline associated with hypothetical accidents. The cumulative fatal length is defined as the section of pipeline in which an accident leads to N or more fatalities. These parameters can be estimated easily by using the information of pipeline geometry and population density of a Geographic Information Systems (GIS). To demonstrate the proposed method, individual and societal risks for a sample pipeline have been estimated from the historical data of European Gas Pipeline Incident Data Group and BG Transco. With currently acceptable criteria taken into account for individual risk, the minimum proximity of the pipeline to occupied buildings is approximately proportional to the square root of the operating pressure of the pipeline. The proposed method of quantitative risk assessment may be useful for risk management during the planning and building stages of a new pipeline, and modification of a buried pipeline

  1. Gas pipelines and the American lobster, Homarus americanus

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, R.A. [Connecticut Univ., Groton, CT (United States); Clancy, M. [Boston Univ., MA (United States); Cobb, J.S. [Rhode Island Univ., Kingston, RI (United States)

    2003-07-01

    One of the main objectives of the megabenthic study of the New England continental shelf conducted during the 1970s and the 1980s was to define the migratory behavior and overall ecology of the offshore American lobster. The study involved more than 100 manned submersible divers on the outer continental shelf, upper continental slope, Georges Bank and submarine canyons. It also included an extensive lobster tagging program. The study provided valuable information on the ecology and behaviour of the lobster and several other megabenthic fauna that could be affected by the presence of a gas pipeline running parallel to the outer continental shelf, from eastern Georges Bank to northern New Jersey. The study showed that an exposed 2-4 diameter pipeline would impede the normal onshore and offshore migration of this deep water lobster species because its' migration is done by walking rather than swimming, and any overhanging structure would block its path. It was emphasized that it is extremely important to maintain spring to early summer onshore migration in the multi-million dollar lobster industry. This paper offered suggestions for modifying pipe encasements to solve the migration problem.

  2. 77 FR 64972 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-10-24

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on October 10, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in the above captioned docket an application pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA) for a...

  3. 75 FR 35700 - Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines

    Science.gov (United States)

    2010-06-23

    ...] Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines June 17, 2010. AGENCY... reporting forms required to be filed by natural gas companies (FERC Form Nos. 2, 2-A, [[Page 35701

  4. ANALYSIS OF DEPENDENCE BETWEEN CAPITAL EXPENDUTURES OF CONSTRUCTION WORKS AND GAS DISTRIBUTION PIPELINE DIAMETER

    Directory of Open Access Journals (Sweden)

    Tabunshchikov Yuriy Andreevich

    2012-10-01

    The research also contemplates the structure of expenses associated with the piping of gas distribution networks. Mathematical equations have been derived to perform sufficiently accurate calculations of costs of construction of various types and various lengths of gas pipelines.

  5. Adding new natural gas pipeline capacity during a transition toward competitive natural gas markets: the case of California

    International Nuclear Information System (INIS)

    Jimison, J.W.

    1992-01-01

    Major changes are imminent for the California natural gas market. Enlargements of interstate natural gas pipeline capacity have been proposed, to California from six producing regions in the U.S. and Canada. Planned to alleviate current constraints, the proposed new capacity, if it is all built, will exceed the projected amount required for peak day supplies for years to come, and could overturn current market dynamics and price-setting. Concurrently, the regulatory controls applying to California utilities and customers have been undergoing a profound change under guidance of the California Public Utility Commission, as have the regulations applying to interstate pipelines under the Federal Energy Regulatory Commission. Under the new rules, the risks but not necessarily the benefits of excess pipeline construction and market changes appear likely to fall on shippers and industrial customers, rather than small utility ratepayers. Disputes are under way over the entitlement of various groups to the depreciated value of some existing capacity, including the issue of pricing the new capacity on a rolled-in or incremental basis. Disputes are also likely over responsibility for the costs of other existing interstate capacity which may be idled as a result of the surplus

  6. Mackenzie Gas Project : gas resource and supply study

    International Nuclear Information System (INIS)

    Harris, D.G.; Braaten, K.M.

    2004-01-01

    A study was conducted to assess the future gas supply for the Mackenzie Gas Project. The economically recoverable gas resources and deliverability in the region were assessed in order to support construction of the Mackenzie Valley pipeline and the associated gathering system. This supply study was based on a 25 year timeframe for resource development. Production forecasts were also prepared for 50 years following the date of the study. Natural gas forecasts for the general area to be served by the proposed pipeline were also presented. This report includes an introduction to the final gas resource and supply study as well as the regional geology relating to discovered and undiscovered resources. The following regions were included in the study area: onshore Mackenzie Delta including the Niglintgak, Parsons Lake and Taglu anchor fields; central Mackenzie Valley region extending from the Mackenzie Delta south to 63 degrees latitude; northern portion of the Yukon Territory; and, portions of the offshore Mackenzie Delta region limited to a water depth of 30 metres. Forecasts and economic analyses were prepared for the following 3 scenarios: contingent onshore resources only; contingent and prospective onshore resources; and, contingent and prospective onshore and offshore resources. Sensitivity forecasts were prepared for a fully expanded pipeline capacity of 1.8 bcf/day with an equal capacity gathering system. In addition, the National Energy Board estimates of resources for the 3 anchor field were used in place of the operator's estimates. A geological review was included for the plays in the study area. 15 refs., 43 tabs., 38 figs

  7. Fracture propagation in gas pipelines - relevance to submarine lines

    Energy Technology Data Exchange (ETDEWEB)

    Fearnehough, G D [British Gas Corp., Newcastle upon Tyne. Engineering Research Station

    1976-09-01

    This paper reviews the factors which control fracture propagation in pipes and suggests how they are influenced by submarine environments. If fracture arrest capability is required then these factors should be considered in terms of the design philosophy and the maximum tolerable length of fracture which can be repaired. The paper shows that brittle fracture characteristics of submarine pipelines are probably similar to land based lines and fracture arrest can only be guaranteed by appropriate material toughness specification. Resistance to ductile fracture propagation in submarine lines is enhanced by lower design stresses, thicker pipe, concrete coating and the effect of hydrostatic head on gas dynamics. However, additional factors due to submarine design can be deleterious viz: uncertainty about backfill integrity and a tendency of thicker steels to low fracture resistance arising from 'separation' formation. Attention is drawn to problems which may arise with transportation of gases rich in hydrocarbons and the use of mechanical methods of fracture arrest.

  8. Metallurgical analysis of high pressure gas pipelines rupture

    International Nuclear Information System (INIS)

    Hasan, F.; Ahmed, F.

    2007-01-01

    On 6 July 2004, two parallel-running gas pipelines (18-inch and 24-inch diameters), in the main transmission network of SNGPL (a gas company in Pakistan) were ruptured. The ruptures occurred in the early hours of the morning about 8 miles downstream of the compressor station AC-4. The ruptures were indicated by the increased gas flow at the outlet of AC-4 (1), first at about 0648 hours and then again about 20 minutes later. The gas escaping from the ruptured lines had caught fire, and the flames had also 'affected' a third parallel-running pipeline of 30-inch diameter, lying next to the 24-inch line. The metallurgical examination of the two ruptured lines showed that the 24-inch line was ruptured with the help of an explosive device that had been placed on the underside of the pipe. An examination of the 18-inch line showed that this pipe had failed as a result of the heating of the pipe-wall, presumably, by the flame emanating from the 24-inch line. These two observations clearly suggested that the 24-inch line was the first to rupture (by explosives), and the fire following this rupture had heated the 18-inch pipe to a temperature where its yield strength was unable to support the inside gas pressure. The 20 minutes time interval between the two ruptures was obviously the time taken by the 18 inch pipe to be heated upto the level where it started to yield. The 30-inch line lying next to the 24-inch line was affected to the extent that its coating had been burnt-off over a length of about 40-50 feet. However, the pipe did not exhibit any signs of deshaping or deformation what-so-ever. A replica metallographic examination indicated that the microstructure of the pipe was not measurably affected by the heat. It was thus decided not to replace the affected part of the 30-inch pipe, but only to re-coat this affected portion. (author)

  9. Statistical analyses of incidents on onshore gas transmission pipelines based on PHMSA database

    International Nuclear Information System (INIS)

    Lam, Chio; Zhou, Wenxing

    2016-01-01

    This article reports statistical analyses of the mileage and pipe-related incidents data corresponding to the onshore gas transmission pipelines in the US between 2002 and 2013 collected by the Pipeline Hazardous Material Safety Administration of the US Department of Transportation. The analysis indicates that there are approximately 480,000 km of gas transmission pipelines in the US, approximately 60% of them more than 45 years old as of 2013. Eighty percent of the pipelines are Class 1 pipelines, and about 20% of the pipelines are Classes 2 and 3 pipelines. It is found that the third-party excavation, external corrosion, material failure and internal corrosion are the four leading failure causes, responsible for more than 75% of the total incidents. The 12-year average rate of rupture equals 3.1 × 10"−"5 per km-year due to all failure causes combined. External corrosion is the leading cause for ruptures: the 12-year average rupture rate due to external corrosion equals 1.0 × 10"−"5 per km-year and is twice the rupture rate due to the third-party excavation or material failure. The study provides insights into the current state of gas transmission pipelines in the US and baseline failure statistics for the quantitative risk assessments of such pipelines. - Highlights: • Analyze PHMSA pipeline mileage and incident data between 2002 and 2013. • Focus on gas transmission pipelines. • Leading causes for pipeline failures are identified. • Provide baseline failure statistics for risk assessments of gas transmission pipelines.

  10. Differential subsidence and its effect on subsurface infrastructure: predicting probability of pipeline failure (STOOP project)

    Science.gov (United States)

    de Bruijn, Renée; Dabekaussen, Willem; Hijma, Marc; Wiersma, Ane; Abspoel-Bukman, Linda; Boeije, Remco; Courage, Wim; van der Geest, Johan; Hamburg, Marc; Harmsma, Edwin; Helmholt, Kristian; van den Heuvel, Frank; Kruse, Henk; Langius, Erik; Lazovik, Elena

    2017-04-01

    Due to heterogeneity of the subsurface in the delta environment of the Netherlands, differential subsidence over short distances results in tension and subsequent wear of subsurface infrastructure, such as water and gas pipelines. Due to uncertainties in the build-up of the subsurface, however, it is unknown where this problem is the most prominent. This is a problem for asset managers deciding when a pipeline needs replacement: damaged pipelines endanger security of supply and pose a significant threat to safety, yet premature replacement raises needless expenses. In both cases, costs - financial or other - are high. Therefore, an interdisciplinary research team of geotechnicians, geologists and Big Data engineers from research institutes TNO, Deltares and SkyGeo developed a stochastic model to predict differential subsidence and the probability of consequent pipeline failure on a (sub-)street level. In this project pipeline data from company databases is combined with a stochastic geological model and information on (historical) groundwater levels and overburden material. Probability of pipeline failure is modelled by a coupling with a subsidence model and two separate models on pipeline behaviour under stress, using a probabilistic approach. The total length of pipelines (approx. 200.000 km operational in the Netherlands) and the complexity of the model chain that is needed to calculate a chance of failure, results in large computational challenges, as it requires massive evaluation of possible scenarios to reach the required level of confidence. To cope with this, a scalable computational infrastructure has been developed, composing a model workflow in which components have a heterogeneous technological basis. Three pilot areas covering an urban, a rural and a mixed environment, characterised by different groundwater-management strategies and different overburden histories, are used to evaluate the differences in subsidence and uncertainties that come with

  11. Planning the network of gas pipelines through modeling tools

    Energy Technology Data Exchange (ETDEWEB)

    Sucupira, Marcos L.L.; Lutif Filho, Raimundo B. [Companhia de Gas do Ceara (CEGAS), Fortaleza, CE (Brazil)

    2009-07-01

    Natural gas is a source of non-renewable energy used by different sectors of the economy of Ceara. Its use may be industrial, residential, commercial, as a source of automotive fuel, as a co-generation of energy and as a source for generating electricity from heat. For its practicality this energy has a strong market acceptance and provides a broad list of clients to fit their use, which makes it possible to reach diverse parts of the city. Its distribution requires a complex network of pipelines that branches throughout the city to meet all potential clients interested in this source of energy. To facilitate the design, analysis, expansion and location of bottlenecks and breaks in the distribution network, a modeling software is used that allows the network manager of the net to manage the various information about the network. This paper presents the advantages of modeling the gas distribution network of natural gas companies in Ceara, showing the tool used, the steps necessary for the implementation of the models, the advantages of using the software and the findings obtained with its use. (author)

  12. Trans-Caspian gas pipeline feasibility study. Volume 2

    International Nuclear Information System (INIS)

    1999-01-01

    This study, conducted by Enron Engineering and Construction Company, was funded by the US Trade and Development Agency. The study provides detailed information concerning natural gas demand in Turkey and Southern Europe. The purpose of the study is to estimate the rate at which new gas can be absorbed in the Turkish market and be re-exported to the markets in Europe, as well as to forecast Turkish natural gas demand for the period up to 2020. The study also evaluates gas demand and pricing for the market in the 2002--2005 time frame. This is Volume 2 of a 3-volume report, and it is divided into the following sections: (1) Executive Summary; (2) Policy, Legal and Administrative Framework; (3) Assessment of Alternatives; (4) Baseline Conditions in the Project Area; (5) Potential (Unmitigated) Environment, Health and Safety Impacts; (6) Proposed Environmental Prevention and Mitigation; (7) Projected Net Environmental Impacts; (8) Bibliography

  13. Trans-Caspian gas pipeline feasibility study. Volume 1

    International Nuclear Information System (INIS)

    1999-01-01

    This study, conducted by Enron Engineering and Construction Company, was funded by the US Trade and Development Agency. The study provides detailed information concerning natural gas demand in Turkey and Southern Europe. The purpose of the study is to estimate the rate at which new gas can be absorbed in the Turkish market and be re-exported to the markets in Europe, as well as to forecast Turkish natural gas demand for the period up to 2020. The study also evaluates gas demand and pricing for the market in the 2002--2005 time frame. This is Volume 1 of a 3-volume report, and is divided into the following sections: (1) Task A: Gas Sales; (2) Task B: Initial Economic Screening; (3) Task D: Project Cost Analysis

  14. Comparisons of sediment losses from a newly constructed cross-country natural gas pipeline and an existing in-road pipeline

    Science.gov (United States)

    Pamela J. Edwards; Bridget M. Harrison; Daniel J. Holz; Karl W.J. Williard; Jon E. Schoonover

    2014-01-01

    Sediment loads were measured for about one year from natural gas pipelines in two studies in north central West Virginia. One study involved a 1-year-old pipeline buried within the bed of a 25-year-old skid road, and the other involved a newly constructed cross-country pipeline. Both pipelines were the same diameter and were installed using similar trenching and...

  15. Assessing fugitive emissions of CH4 from high-pressure gas pipelines in the UK

    Science.gov (United States)

    Clancy, S.; Worrall, F.; Davies, R. J.; Almond, S.; Boothroyd, I.

    2016-12-01

    Concern over the greenhouse gas impact of the exploitation of unconventional natural gas from shale deposits has caused a spotlight to be shone on to the entire hydrocarbon industry. Numerous studies have developed life-cycle emissions inventories to assess the impact that hydraulic fracturing has upon greenhouse gas emissions. Incorporated within life-cycle assessments are transmission and distribution losses, including infrastructure such as pipelines and compressor stations that pressurise natural gas for transport along pipelines. Estimates of fugitive emissions from transmission, storage and distribution have been criticized for reliance on old data from inappropriate sources (1970s Russian gas pipelines). In this study, we investigate fugitive emissions of CH4 from the UK high pressure national transmission system. The study took two approaches. Firstly, CH4 concentration is detected by driving along roads bisecting high pressure gas pipelines and also along an equivalent distance along a route where no high pressure gas pipeline was nearby. Five pipelines and five equivalent control routes were driven and the test was that CH4 measurements, when adjusted for distance and wind speed, should be greater on any route with a pipe than any route without a pipe. Secondly, 5 km of a high pressure gas pipeline and 5 km of equivalent farmland, were walked and soil gas (above the pipeline where present) was analysed every 7 m using a tunable diode laser. When wind adjusted 92 km of high pressure pipeline and 72 km of control route were drive over a 10 day period. When wind and distance adjusted CH4 fluxes were significantly greater on routes with a pipeline than those without. The smallest leak detectable was 3% above ambient (1.03 relative concentration) with any leaks below 3% above ambient assumed ambient. The number of leaks detected along the pipelines correlate to the estimated length of pipe joints, inferring that there are constant fugitive CH4 emissions from

  16. Trans-Caspian gas pipeline feasibility study. Volume 3

    International Nuclear Information System (INIS)

    1999-01-01

    This study, conducted by Enron Engineering and Construction Company, was funded by the US Trade and Development Agency. The study provides detailed information concerning natural gas demand in Turkey and Southern Europe. The purpose of the study is to estimate the rate at which new gas can be absorbed in the Turkish market and be re-exported to the markets in Europe, as well as to forecast Turkish natural gas demand for the period up to 2020. The study also evaluates gas demand and pricing for the market in the 2002--2005 time frame. This is Volume 3 of a 3-volume report, and it is divided into the following sections: (1) Executive Summary; (2) Task C: Technical Feasibility and Preliminary Design; (3) Task F: Project Implementation Strategy

  17. Comparative QRA (Quantitative Risk Analysis) of natural gas distribution pipelines in urban areas; Analise comparativa dos riscos da operacao de linhas de gas natural em areas urbanas

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Luiz Fernando S. de [Energy Solutions South America (Brazil); Cardoso, Cassia de O.; Storch, Rafael [Det Norske Veritas (DNV) (Brazil)

    2008-07-01

    The natural gas pipeline network grows around the world, but its operation inherently imposes a risk to the people living next to pipelines. Due to this, it is necessary to conduct a risk analysis during the environmental licensing in Brazil. Despite the risk analysis methodology is well established, some points of its application for the distribution pipelines are still under discussion. This paper presents a methodology that examines the influences of major projects and operating parameters on the risk calculation of a distribution pipeline accident in urban areas as well as the possible accident scenarios assessment complexity. The impact of some scenarios has been evaluated using a Computational Fluid Dynamics tool. The results indicate that, under certain conditions, the risks from the pipeline operation under operating pressures of 20 bar may be acceptable in location class 3 or even in class 4. These results play a very important role if management decisions on the growth of the distribution of natural gas network in densely populated areas as well as in the improvement of laws to control the activity of distribution of natural gas. (author)

  18. Power law of distribution of emergency situations on main gas pipeline

    Science.gov (United States)

    Voronin, K. S.; Akulov, K. A.

    2018-05-01

    The article presents the results of the analysis of emergency situations on a main gas pipeline. A power law of distribution of emergency situations is revealed. The possibility of conducting further scientific research to ensure the predictability of emergency situations on pipelines is justified.

  19. 77 FR 43277 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-07-24

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on July 6, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in the above referenced... Company, L.L.C. 1001 Louisiana Street, Houston, Texas 77002, or telephone (713) 420- 3299, or facsimile...

  20. Risk based asset management of pipeline networks for gas and water

    NARCIS (Netherlands)

    Abspoel, L.M.; Courage, W.M.G.; Broeck, W. van den; Kruse, H.

    2017-01-01

    Pipeline networks for gas and water are the lifelines of our society. Their presence and correct functioning translates in benefits and any disruption, malfunctioning or ruptures represent hazards for the community. Most pipelines are buried, which impedes direct monitoring of the structural

  1. Application of pre-stressed technology in the crossing construction of the China–Myanmar Gas Pipeline

    Directory of Open Access Journals (Sweden)

    Xuejun Wang

    2015-01-01

    Full Text Available Concrete structure is commonly used in the anchorages of a large cable-suspended pipeline crossing construction. With the increase of span and load, the stress on the concrete anchorages may rise rapidly. In case of traditional anchoring structure fixed by anchor rods, concrete cracking will occur, thereby reducing the anchorage life. To solve this problem, the pre-stressed structure was designed to effectively improve the efficiency of anchoring and reduce engineering cost. In the crossing construction of China–Myanmar Gas Pipeline, the pre-stressed technology was used to establish an effective pre-stressed anchoring system, which integrates the pre-stressed structures (e.g. tunnel anchorages in the anchors and the optimization measures (e.g. positioning mode, anchorage structure, concrete placement, pre-stressed, and medium injection, in line with the crossing structure and load features of this project. The system can delay the occurrence of concrete cracking and enhance the stress durability of the structure and anchoring efficiency. This technology has been successfully applied in the crossing construction of China–Myanmar Gas Pipeline, with good economic and social benefits, indicating that this technology is a new effective solution to the optimization of suspended pipeline anchorage structures, providing technical support for the development of pipeline crossing structure.

  2. The Application of Simulation Method in Isothermal Elastic Natural Gas Pipeline

    Science.gov (United States)

    Xing, Chunlei; Guan, Shiming; Zhao, Yue; Cao, Jinggang; Chu, Yanji

    2018-02-01

    This Elastic pipeline mathematic model is of crucial importance in natural gas pipeline simulation because of its compliance with the practical industrial cases. The numerical model of elastic pipeline will bring non-linear complexity to the discretized equations. Hence the Newton-Raphson method cannot achieve fast convergence in this kind of problems. Therefore A new Newton Based method with Powell-Wolfe Condition to simulate the Isothermal elastic pipeline flow is presented. The results obtained by the new method aregiven based on the defined boundary conditions. It is shown that the method converges in all cases and reduces significant computational cost.

  3. The Ikhil Gas Project: developing the first commercial natural gas project north of the Arctic Circle

    Energy Technology Data Exchange (ETDEWEB)

    Malin, G. [AltaGas Services Inc., AB (Canada)

    2001-07-01

    Development of the Ikhil Natural Gas Project by the Inuvialuit Petroleum Corporation in partnership with Enbridge and AltaGas Services are described in a step-by-step fashion. A minimum of 11 Bcf of recoverable natural gas reserves have been established to date. The Northwest Territories Power Corporation is committed under a 15-year take-or-pay contract to take the gas, and the Town of Inuvik also has a franchise agreement with the project owners for a 15-year period. Challenges faced and overcome in adapting to the regulatory process, the engineering problems that required special solutions (e.g. ice/snow roads, gravel pad to support wellhead and production facilities, reducing temperature of gas to avoid disturbing the permafrost, sand-padding pipeline to supplement high ice/content material), converting a diesel town to a natural gas town, and installing an underground distribution system in ground that is constantly shifting due to permafrost, are some of the examples discussed. Benefits accruing to local people and businesses during construction and the production phases of the project are described, along with details of an assessment and discussion of lessons learned after two years of operation. Overall, the project is considered to have been an engineering success. Financially, it is too early to judge, but it is expected that with economic development in Inuvik taking off, demand for natural gas and electricity will develop and justify the confidence of the developers.

  4. Alarm management in gas pipeline plant: a case study

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Juliano; Lima, Marcelo; Leitao, Gustavo; Guedes, Luiz Affonso [Universidade Federal do Rio Grande do Norte (UFRN), Natal, RN (Brazil); Branco, Nicolau; Coelho, Robson; Elias, Gustavo Passos; Nunes, Marcelo [Transportadora Brasileira Gasoduto Bolivia-Brasil (TBG), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    In order to improve the requirements of industrial processes, many decision support systems have been introduced in recent years. In this context, the alarm management systems have great relevance. On the other hand, the informatics revolution allowed a great increase of information concerning the operation of the industrial processes. Currently, process operators handle an excessive number of about 1.500 alarms per day. Thus, this overdose of information implies in the discredit of alarms. Then, in order to improve the operation activities of industrial processes, it is mandatory to incorporate procedures to evaluate and rationalize alarms. Since the EMMUA191 Standard is the reference guide to alarm management, but it does not specify how to execute an alarm management procedure, in this paper, a systematic procedure to evaluate alarms configurations in industrial processes is proposed. This procedure is in line with EMMUA191 and is composed by the following steps: to use statistics analyses to identify problematic alarms, such as occurrence, intermittency, correlation, and flooding calculation; to indicate problematic alarm group; and to propose a set of actions to be implemented. To validate our proposal, we present a case study in a gas pipeline plant using the BR-AlarmExpert software. (author)

  5. Assessing fugitive emissions of CH4 from high-pressure gas pipelines

    Science.gov (United States)

    Worrall, Fred; Boothroyd, Ian; Davies, Richard

    2017-04-01

    The impact of unconventional natural gas production using hydraulic fracturing methods from shale gas basins has been assessed using life-cycle emissions inventories, covering areas such as pre-production, production and transmission processes. The transmission of natural gas from well pad to processing plants and its transport to domestic sites is an important source of fugitive CH4, yet emissions factors and fluxes from transmission processes are often based upon ver out of date measurements. It is important to determine accurate measurements of natural gas losses when compressed and transported between production and processing facilities so as to accurately determine life-cycle CH4 emissions. This study considers CH4 emissions from the UK National Transmission System (NTS) of high pressure natural gas pipelines. Mobile surveys of CH4 emissions using a Picarro Surveyor cavity-ring-down spectrometer were conducted across four areas in the UK, with routes bisecting high pressure pipelines and separate control routes away from the pipelines. A manual survey of soil gas measurements was also conducted along one of the high pressure pipelines using a tunable diode laser. When wind adjusted 92 km of high pressure pipeline and 72 km of control route were drive over a 10 day period. When wind and distance adjusted CH4 fluxes were significantly greater on routes with a pipeline than those without. The smallest leak detectable was 3% above ambient (1.03 relative concentration) with any leaks below 3% above ambient assumed ambient. The number of leaks detected along the pipelines correlate to the estimated length of pipe joints, inferring that there are constant fugitive CH4 emissions from these joints. When scaled up to the UK's National Transmission System pipeline length of 7600 km gives a fugitive CH4 flux of 4700 ± 2864 kt CH4/yr - this fugitive emission from high pressure pipelines is 0.016% of the annual gas supply.

  6. Impact of fractionator and pipeline projects on Gulf Coast NGL markets: 1992--1997

    International Nuclear Information System (INIS)

    Lippe, D.L.

    1993-01-01

    This paper focuses on the impact of major pipeline and fractionation expansion projects on Gulf Coast NGL supply/demand balances over the next five years. Specific projects that are included in this evaluation are summarized below: NGL pipeline expansions -- (1) Seminole pipeline, MAPCO (purity products and raw mix) and (2) Sterling pipeline, Koch (purity products); Mont Belvieu fractionator expansions -- (1) Enterprise Products Company (raw mix), (2) Warren Petroleum Company (raw mix), and (3) Trident, et al. Gulf Coast II Fractionator (raw mix); Westlake Petrochemical Company (E/P splitter). The impact of these projects is evaluated for specific NGL products including: purity ethane; E/P mix; propane; N-butane

  7. Regulatory assessment with regulatory flexibility analysis : draft regulatory evaluation - Notice of Proposed Rulemaking -- Pipeline Safety : safety standards for increasing the maximum allowable operating pressure for natural gas transmission pipelines.

    Science.gov (United States)

    2008-02-01

    The Pipeline and Hazardous Materials Safety Administration (PHMSA) is proposing changes to the Federal pipeline safety regulations in 49 CFR Part 192, which cover the transportation of natural gas by pipeline. Specifically, PHMSA proposes allowing na...

  8. Cracking resistance study of steel for gas pipelines; Badania odpornosci stali przeznaczonej na rurociagi gazowe

    Energy Technology Data Exchange (ETDEWEB)

    Wasiak, J.; Bilous, W.; Hajewska, E.; Szteke, W.; Wagner, T. [Institute of Atomic Energy, Otwock-Swierk (Poland)

    1996-12-31

    The results of cracking resistance of steel tubes for gas pipelines have been performed. The temperature dependence of mechanical properties of X56 steel used as tube material have been shown. 2 refs, 6 figs, 4 tabs.

  9. Use of GRASS for routing gas pipeline rights-of-way

    International Nuclear Information System (INIS)

    Sydelko, P.J.

    1992-01-01

    This study, sponsored by the Gas Research Institute (GRI), was conducted to illustrate how a GIS (Geographic Information System) can be used to assess alternative routes for new gas pipeline rights-of-way (ROWs). The results show that a least-cost analysis using GRASS (Geographic Resources Analysis and Support System) is a good method for siting new gas pipeline ROWs on the basis of environmental and engineering constraints to pipeline construction and maintenance. The cost and time needed to use this least-cost approach compare favorably with the current methods used by gas pipeline company planners and engineers. The types of criteria used, as well as the costs or weights given to the criteria, can be changed easily. This provides the flexibility to assess several alternatives quickly and easily

  10. Oil and Gas Pipelines in the Gulf of Mexico from BOEM

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A line file representing locations of the pipeline infrastructure in the Gulf of Mexico associated with the oil and gas industry is presented. These layers were...

  11. Management of gas pipelines maintenance. La gestion integrada del mantenimiento de gaseoductos

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez Pascal, J; Zarraga Uribarri, J M [ENAGAS (Spain)

    1993-03-01

    A overview on problems and unconveniences arising from the maintenance of pipeline gas networks is given. Computerized data processing can be a solution to optimize the available resources in order to achieve complete reliability and safety. (Author)

  12. 75 FR 10242 - Tennessee Gas Pipeline Company; Notice of Availability of the Environmental Assessment for the...

    Science.gov (United States)

    2010-03-05

    ... (TGP) in the above referenced docket. TGP requests authorization to expand its natural gas pipeline... potentially affected by TGP's proposal and participate in the NEPA analysis. These cooperating agencies will...

  13. Vibrational methods of the overhead gas-pipelines technological equipment diagnostics

    International Nuclear Information System (INIS)

    Zakhezin, A.M.; Malysheva, T.V.

    2001-01-01

    The diagnostic methods of overhead gas-pipelines of the technical equipment of gas-compressor station are considered in this article by carrying out registration certification documentation. Some faults of overhead technical gas-pipelines have been proposed. This paper is devoted to the diagnostic methods of the whole gas- pipelines and their parts for some faults during expert checking fulfillment and carrying out registration certification documentation. The analysis of all defects allows to determine a 'between-repairs interval', to develop some operations to avoid these faults and to estimate the repair operation quality, to reduce failure probability. As an example of the effectiveness of technical condition service of vibrational methods by expertise fulfillment have been considered for some defects of the overhead pipelines. (author)

  14. Simplification of executive procedures for construction and assembly of terrestrial gas pipelines through illustrations

    Energy Technology Data Exchange (ETDEWEB)

    Filho, Mario D.C.; Bresci, Claudio T.; Dantas, Augusto Cesar de C.; Machado, Clara C. Torres S. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Sobreiro, Flavia L. [Telsan Engenharia, Belo Horizonte, MG (Brazil)

    2009-07-01

    This study aims to show a simple, efficient and fun method that seeks to minimize the weaknesses and help to increase the perception of risk analysis and systematization the operation discipline. This project uses the methodology of images illustrated in the executive procedures, and is based on the activities of construction and assembly, HSE and social communication in gas pipeline ventures, setting and maintaining access to practical information, yet are prepared a work instructions that summarize each process, as a form of material support in training. Among several objectives that have shaped the strategies for this project, the main is to provide the workforce engaged in the activities of field, greater facility in implementing the technical information contained in the procedures, from a wider and better understanding of the guidelines described in the documentation. (author)

  15. Development of corrosion defect assessment program for API X65 gas pipelines

    International Nuclear Information System (INIS)

    Choi, Jae Boong; Kim, Youn Ho; Kim, Young Jin; Goo, Bon Geol; Kim, Yound Pyo; Baek, Jong Hyun; Kim, Woo Sik

    2001-01-01

    Pipelines have the highest capacity and are the safest and the least environmentally disruptive way for gas or oil transmission. Recently, failures due to corrosion defects have become of major concern in maintaining pipeline integrity. A number of solutions have been developed for the assessment of remaining strength of corroded pipelines. However, these solutions are known to be dependent on material properties and pipeline geometries. In this paper, a fitness-for-purpose type limit load solution for corroded gas pipelines made of the X65 steel is proposed. For this purpose, a series of burst tests with various types of corrosion defects are performed. Finite element simulations are carried out to derive an appropriate failure criterion. And then, further, extensive finite element analyses are performed to obtain the FFP type limit load solution for corroded X65 gas pipelines as a function of defect depth, length and pipeline geometry. And also, a window based computer program for the assessment of corrosion defect, which is named as COPAP(COrroded Pipeline Assessment Program) has been developed on the basis of proposed limit load solution

  16. Gas market distorting effects of imbalanced gas balancing rules: Inefficient regulation of pipeline flexibility

    International Nuclear Information System (INIS)

    Keyaerts, Nico; Hallack, Michelle; Glachant, Jean-Michel; D'haeseleer, William

    2011-01-01

    This paper analyzes the value and cost of line-pack flexibility in liberalized gas markets through examination of the techno-economic characteristics of gas transport pipelines and the trade-offs between different ways to use the infrastructure: transport and flexibility. Line-pack flexibility is becoming increasingly important as a tool to balance gas supply and demand over different periods. In the European liberalized market context, a monopolist unbundled network operator offers regulated transport services and flexibility (balancing) services according to the network code and balancing rules. Therefore, gas policy makers should understand the role and consequences of line-pack regulation. The analysis shows that the line-pack flexibility service has an important economic value for the shippers and the TSO. Furthermore, the analysis identifies distorting effects in the gas market due to inadequate regulation of line-pack flexibility: by disregarding the sunk costs of flexibility in the balancing rules, the overall efficiency of the gas system is decreased. Finally, the analysis demonstrates that the actual costs of line-pack flexibility are related to the peak cumulative imbalance throughout the balancing period. Any price for pipeline flexibility should, therefore, be based on the related trade-off between the right to use the line-pack flexibility and the provision of transport services. - Research Highlights: →Line-pack flexibility is a main gas balancing instrument. →Capacity related costs of line-pack flexibility depend on peak cumulative imbalances. →Line-pack pricing rules determine choice between ex ante and ex post balancing. →Inefficient line-pack regulation causes gas market distortions.

  17. The impact of market changes on long-term take-or-pay export contracts for LNG and pipeline gas from Mena regions: lessons from Europe

    International Nuclear Information System (INIS)

    Frisch, Morten

    1999-01-01

    This paper examines the contracting structures and prices of liquefied natural gas (LNG) and gas pipeline projects, pricing arrangements in Great Britain, the continental West European gas price adjustment formula, and pricing of LNG transport by ship. The price review introduced in Continental North West European contracts, gas liberalisation and price shocks in Great Britain, the demise of British Gas, and gas liberalisation in continental Europe are discussed. Gas suppliers and European market liberalisation are considered, and MENA (Middle East and North Africa) gas supply arrangements, European buyers, and future price adjustment methods are addressed. (uk)

  18. Northern entanglement : Arctic gas pipeline plans caught in web of competing interests, but dire supply-demand forecasts indicate line will be built

    International Nuclear Information System (INIS)

    Stonehouse, D.

    2005-01-01

    This article discussed land access and regulatory issues surrounding decisions to stop field work of the Mackenzie Valley pipeline in the spring of 2005. Although current supply and demand balances in natural gas markets argue that the pipeline will be beneficial, Imperial Oil and its partners have halted activities such as geotechnical data-gathering programs and preparatory work on contracting construction. The project's future depends on the successful resolution of First Nations land claims, governmental disputes and various activist groups protesting the pipeline's construction. Imperial Oil has suggested that the pipeline presents a significant opportunity for the people of the North to reduce their reliance on government and will create jobs and business opportunities for Aboriginal people. In the aftermath of work stoppage, Alberta's former Energy Minister stated that imports of Liquefied Natural Gas (LNG) and Alaska gas from the proposed Alaska Highway Pipeline Project may arrive on the market in advance of the Mackenzie Valley project, which would affect the project's financial future. It was noted that access and benefits agreements with First Nations stakeholders have yet to be reached. Lawsuits involving the Deh Cho First Nations were examined. It was also suggested that Imperial Oil has not included information on the Alberta portion of the project in its environmental impact assessment. It was concluded that if the Mackenzie Delta line isn't in service by 2010, North American consumers can expect to spend an extra $190 billion on gas from 2011 to 2020. 3 figs

  19. Oman- Decisive progress for the Liquefied Natural Gas (LNG) project

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The soon signature of a firm contract with the Korea Gas Corporation and the perspective of an agreement with Thailand will allow the attribution of a construction contract in September 1996. The hypothesis of a third liquefaction train seems to be more and more probable. The project of Oman-India gas pipeline is not given up but only put it back to several years. (N.C.)

  20. GASVOL 18'' gas pipeline - risk based inspection study

    Energy Technology Data Exchange (ETDEWEB)

    Bjoernoey, Ola H.; Etterdal, Birger A. [Det Norske Veritas (DNV), Oslo (Norway); Guarize, Rosimar; Oliveira, Luiz F.S. [Det Norske Veritas (DNV) (Brazil); Faertes, Denise; Dias, Ricardo [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper describes a risk based approach and inspection planning as part of the Pipeline Integrity Management (PIM) system for the 95.5 km long 18'' GASVOL gas pipeline in the South eastern region of Brazil transporting circa 5 000 000 m3 dry gas per day. Pipeline systems can be subject to several degradation mechanisms and inspection and monitoring are used to ensure system integrity. Modern pipeline regulations and codes are normally based on a core safety or risk philosophy. The detailed design requirements presented in design codes are practical interpretations established so as to fulfill these core objectives. A given pipeline, designed, constructed and installed according to a pipeline code is therefore the realization of a structure, which, along its whole length, meets the applicable safety objectives of that code. The main objective of Pipeline Integrity Management (PIM) is to control and document the integrity of the pipeline for its whole service life, and to do this in a cost-effective manner. DNV has a specific approach to RBI planning, starting with an initial qualitative assessment where pipelines and damage type are ranked according to risk and potential risk reduction by an inspection and then carried forward to a quantitative detailed assessment where the level of complexity and accuracy can vary based on availability of information and owner needs. Detailed assessment requires significant effort in data gathering. The findings are dependent upon the accuracy of the inspection data, and on DNV's interpretation of the pipeline reference system and simplifications in the inspection data reported. The following specific failure mechanisms were investigated: internal corrosion, external corrosion, third party interference, landslides and black powder. RBI planning, in general words, is a 'living process'. In order to optimize future inspections, it is essential that the analyses utilize the most recent information regarding

  1. GIS as a practical and powerful tool for gas pipeline design and planning; GIS como ferramenta pratica e poderosa para projeto e planejamento de gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Sidney P. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Gas pipeline design and planning requires the management of huge quantity of information related to environmental, socio-economic and engineering data. To optimize the design process and guarantee a high level of quality and reliability a GIS solution was implemented that proved to be worth taking and adopted the state of the art of the technology available in the market. This paper will present the GIS solution implemented at PETROBRAS Gas and Energy based on APDM, a pipeline data model that is a result of a joint work that has been developed by specialized worldwide oil and gas companies. Two applications developed in house will also be presented, one is the application called Scenario Builder that is related to gas pipeline thermo-hydraulic simulation fully integrated with GIS technology and the other is called Project Viewer that provides different ways of having quick access and visualization of the existing and ongoing projects. (author)

  2. The tightness of the globe valves in the exploitations practice of the gas pipe-lines

    International Nuclear Information System (INIS)

    Pietrak, T.; Rudzki, Z.; Surmacz, W.

    2006-01-01

    Technological units of the Transit Gas Pipeline (i.e. Compressor Stations, Valve Stations, Stations or National Network Service Installations) have been fitted with Ball Valves as shut-off devices (block valves). Internal tightness of the valves' seat becomes major factor in securing proper service conditions during normal pipeline operation as well as for isolating of pipeline sections in emergency situations (loss of pipeline integrity or uncontrolled gas escape). Internal tightness of the valves is being inspected during scheduled maintenance of the pipeline units. Any leak revealed during inspection is being repaired, following instructions provided in the Manufacturer's Valve Manual. After a time, some cases have been identified, when repair of the revealed leak was found to be difficult, despite close following of the repair manuals. The paper presents analysis of the issue and corrective actions taken accordingly. (authors)

  3. Use of geographic information systems for applications on gas pipeline rights-of-way

    Energy Technology Data Exchange (ETDEWEB)

    Sydelko, P.J.; Wilkey, P.L.

    1992-12-01

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way (ROWS) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1) determination of environmentally sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for landuse/landcover that will affect ROWS; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.

  4. 76 FR 62395 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Science.gov (United States)

    2011-10-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-547-000] Natural Gas Pipeline Company of America LLC; Notice of Application Take notice that on September 20, 2011, Natural Gas..., filed in Docket Number CP11-547-000, pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA), an...

  5. 75 FR 36376 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Science.gov (United States)

    2010-06-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-452-000] Natural Gas..., Natural Gas Pipeline Company of America LLC (Natural), 3250 Lacey Road, 7th Floor, Downers Grove, Illinois 60515-7918, filed in Docket Number CP10-452-000, pursuant to sections 7(b) and 7(c) of the Natural Gas...

  6. 76 FR 4516 - Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines

    Science.gov (United States)

    2011-01-26

    ...; Order No. 710-B] Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines... for natural gas companies, contained in FERC Form Nos. 2, 2-A, and 3-Q, to include functionalized fuel..., and reports for natural gas companies, contained in FERC Form Nos. 2, 2-A, and 3-Q, to include...

  7. 78 FR 18968 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Science.gov (United States)

    2013-03-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13-97-000] Natural Gas Pipeline Company of America LLC; Notice of Application Take notice that on March 8, 2013, Natural Gas..., filed an application pursuant to section 7(c) of the Natural Gas Act and part 157 of the Commission's...

  8. Gasification of the southern spread of Bolivia-Brazil gas pipeline

    International Nuclear Information System (INIS)

    Frisoli, Caetano; Senna, Ferando Jose Ennes de; Faria, Jose Aurelio Carvalho de

    2000-01-01

    As to the commissioning of the Northern spread, Inert Direct Purging was also adopted for purging the Southern Spread of Bolivia-Brazil Gas Pipeline. This section is 1191 km long and lies between the city of Paulinia in the State of Sao Paulo up to Canoas in the Sate of Rio Grande do Sul. The Inert Direct Purging is based on the principle of high gas injection flow rates at the initial point and the purging of air at the other end, separated by a nitrogen plug. A purging model, developed by The Gas Research Institute, was used in conjunction with the software Pipeline Studio for planning purposes. The arrival of gas at each valve and the size of gas/nitrogen/air interfaces were also recorded. Graphs and tables compare calculated and recorded data. Final results demonstrated model accuracy and its suitable applicability for purging, as well as the Inert Direct Purging method for gas pipelines of extensive lengths. (author)

  9. The organizational learning in the search of the environmental and social sustainability: an applied Brazilian experience in a project of constructions of gas-pipeline in the Amazon Forest; A aprendizagem organizacional na busca da sustentabilidade ambiental e social: uma experiencia brasileira aplicada em um projeto de construcao de gasoduto na Floresta Amazonica

    Energy Technology Data Exchange (ETDEWEB)

    Mannarino, Ronaldo P. [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The experience of PETROBRAS's performance, when the implantation of the province of Urucu, in the City of Coari, state of Amazon, was constructed on empirical bases and it had as a support landmark the lines of direction dictated in 1988 for famous scientists who acted directly in the Amazon Region. The application of these lines of direction gave support to the implantation of essential activities, such as a fishery of changes, the recovery of sanded small rivers, prevention of spills and the opening of chances for research in that further and little known basin of the Urucu River. The convergence was that PETROBRAS made use of the logistic that the scientists needed; and they made use of the knowledge that the company needed. It was just necessary to adjust the language. The results had been very effective and the province of Urucu became the pioneer and the most expressive unit in environmental management in PETROBRAS. In 1999 the Project PIATAM was implanted: Potential Impacts and Risks of the Transport of Oil and Gas in Amazon, taking care of demands of the future transport of the natural gas to Manaus for gas-pipeline, that became possible in 2003 thanks to the support of the research, whose results had fully taken care of the demands of the environmental licensing of the workmanship. The current work synthesizes the bases of knowledge and the results gotten with the application of these bases in a project of construction of a gas-pipeline of 652 kilometers in full Amazonian forest. In the construction phase, one more time the integration with the scientific community was essential to guarantee the application of the concepts of environment in the workmanship of the Gas-pipeline Urucu - Manaus, with advising of teams from the INPA, like Limnology and of combat the tropical illnesses, as the malaria. Another point of support was the partnership with the Secretariat of Sustainable Development of Amazon in an Accord of application of resources, in 135

  10. The organizational learning in the search of the environmental and social sustainability: an applied Brazilian experience in a project of constructions of gas-pipeline in the Amazon Forest; A aprendizagem organizacional na busca da sustentabilidade ambiental e social: uma experiencia brasileira aplicada em um projeto de construcao de gasoduto na Floresta Amazonica

    Energy Technology Data Exchange (ETDEWEB)

    Mannarino, Ronaldo P [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The experience of PETROBRAS's performance, when the implantation of the province of Urucu, in the City of Coari, state of Amazon, was constructed on empirical bases and it had as a support landmark the lines of direction dictated in 1988 for famous scientists who acted directly in the Amazon Region. The application of these lines of direction gave support to the implantation of essential activities, such as a fishery of changes, the recovery of sanded small rivers, prevention of spills and the opening of chances for research in that further and little known basin of the Urucu River. The convergence was that PETROBRAS made use of the logistic that the scientists needed; and they made use of the knowledge that the company needed. It was just necessary to adjust the language. The results had been very effective and the province of Urucu became the pioneer and the most expressive unit in environmental management in PETROBRAS. In 1999 the Project PIATAM was implanted: Potential Impacts and Risks of the Transport of Oil and Gas in Amazon, taking care of demands of the future transport of the natural gas to Manaus for gas-pipeline, that became possible in 2003 thanks to the support of the research, whose results had fully taken care of the demands of the environmental licensing of the workmanship. The current work synthesizes the bases of knowledge and the results gotten with the application of these bases in a project of construction of a gas-pipeline of 652 kilometers in full Amazonian forest. In the construction phase, one more time the integration with the scientific community was essential to guarantee the application of the concepts of environment in the workmanship of the Gas-pipeline Urucu - Manaus, with advising of teams from the INPA, like Limnology and of combat the tropical illnesses, as the malaria. Another point of support was the partnership with the Secretariat of Sustainable Development of Amazon in an Accord of application of resources, in 135

  11. Leak detection for city gas pipelines based on instantaneous energy distribution characteristics

    Energy Technology Data Exchange (ETDEWEB)

    Zhigang, Chen [Deijing University of Civil Engineering and Architecture, Beijing, (China)

    2010-07-01

    Many natural gas pipelines are used in our cities. The development of efficient leakage detection systems is fundamental for safety issues avoidance. This paper investigated a new solution to the leak detection problem in city gas pipelines based on instantaneous energy distribution. In a theoretical approach, the Hilbert-Huang transform (HHT) was used to provide the instantaneous energy distribution feature of an unstable pressure signal. The signal noise was eliminated thanks to the instantaneous energy contribution. A leakage detection model with instantaneous energy distribution (IED) was then established. The correlation coefficients of instantaneous energy distribution were through correlation analysis. It was found that in different pipeline states, the instantaneous energy distribution characteristics are different. A strong correlation of IED signal characteristics was found of the two ends of a city gas pipeline in the same operation. The test results demonstrated the reliability and validity of the method.

  12. The transit oil and gas pipeline and the role of bargaining: A non-technical discussion

    International Nuclear Information System (INIS)

    Omonbude, Ekpen J.

    2007-01-01

    Transit oil and gas pipelines are growing in relevance, and face a number of topical problems. One of such issues is the problem of potential disruption from a number of sources, notably post-construction behaviour of the transit country. Present and future pipelines face the risk of continuous conflict over legal, economic and political issues. Once the pipeline is built and in operation, the threat of disruption of the pipeline by the transit country over disputed transit terms exists. This is due to two key problems: first, a shift in bargaining powers to the transit country upon construction and operation of the pipeline and, second, changes in the value of the throughput imply price changes that can affect the behaviour of the transit country. This paper discusses the role of basic bargaining principles in cross-border oil and gas pipelines involving transit through one or more countries. It finds that the motive behind the pipeline plays a key role in the prevention of potential disruptions to the pipeline due to rent squeezing. Also, although the potential of such disruptions does exist, there are a number of factors that could serve to mute the consequences of shifts in bargaining power to the transit countries

  13. External coatings for buried pipelines - a project approach; Revestimento externo para dutos enterrados - uma abordagem de projeto

    Energy Technology Data Exchange (ETDEWEB)

    Nunes, Laerce de P.; Gomes, Luiz Paulo; Nunes, Alessandra de M. [IEC - Instalacoes e Engenharia de Corrosao Ltda., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The transport of liquid or gas fluids, such as water, fuel, chemical products, minerals, among others, through underground pipelines, is becoming more significant in the whole world, specially in Brazil, due to low cost, operational security and low physical interference at the surface. By the other hand, the ambient matters, the population's security in pipeline tracing and economic aspects lead to greater requirements in relation to the integrity of those installations. Corrosion is one of the most important causes of underground pipelines' deterioration and coating and cathodic protection are recommended to prevent it from occurring. However, both techniques must be considered in the pipeline project for it to be successful. At the present work the most important kinds of coating for underground pipelines are presented, as well as the applications, limitations, reference norms and the interface with the cathodic protection systems in relation to the efficiencies to be adopted and the expected performance. Is it also discussed the welded piping joints confection and the protection difficulties when the efficiencies are not corresponded to those foreseen in the cathodic protection systems project. (author)

  14. Western Gas Sands Project status report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C.H.

    1978-11-30

    Progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States is summarized. A Technology Implementation Plan (TIP) meeting was held at the CER office in Las Vegas, Nevada, October 16--19 to initiate the implementation phase of the Enhanced Gas Recovery (EGR) working group activities. A WGSP Logging Program meeting was conducted on October 24, 1978, at CER offices to define the problems associated with logs in tight gas sands. CER personnel and the project manager attended a two-day course on the fundamentals of core and reservoir analysis in Denver, Colorado, and met with USGS personnel to discuss USGS work on the WGSP. A meeting was held to discuss a contract for coring a Twin Arrow well on the Douglas Creek Arch, Colorado. CER Corporation personnel attended the Geological Society of America Annual Meeting held in Toronto, Canada, October 23--27 and a Gas Stimulation Workshop at Sandia Laboratories in Albuquerque, New Mexico, October 11 and 12 to discuss recent mineback experiments conducted at the Nevada Test Site. Fiscal year 1979 projects initiated by USGS and the Energy Technology Centers and National Laboratories are progressing as scheduled. Mobil Research and Development Corporation fractured zone 8 of the F-31-13G well in Rio Blanco County, Colorado. Colorado Interstate Gas Company poured the concrete pad for the compresser expected to be delivered in December and were laying pipeline between the wells at month end. The Mitchell Energy well, Muse Duke No. 1 was flowing on test at a rate of 2,100 Mcfd and preparations proceeded to fracture the well on November 15 with approximately 1,000,000 gal of fluid and 3,000,000 lb of sand. Terra Tek completed laboratory analyses of cores taken from the Mitchell Energy well.

  15. Location class change impact on onshore gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Cassia de Oliveira; Oliveira, Luiz Fernando Seixas de [DNV Energy Solutions, Oslo (Norway); Leal, Cesar Antonio [DNV Energy Solutions, Porto Alegre, RS (Brazil); Faertes, Denise [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil). Gas and Energy

    2009-07-01

    During a pipeline life cycle, some significant changes in the population may happen along its route. Such changes are indirectly evaluated by the increase in the amount of buildings constructed along the route, which determines the so called Location Class. Such changes, after licensing, provoke differences between what is required by the standards and what is actually done. This work has two goals. One is to study the requirements of international standards and legislations as well as some solutions used in the United States, Canada, United Kingdom and Netherlands. This goal intends to provide some technical bases for a comparative analysis on how the location class changes, during the life cycle of a pipeline, are treated in each country. Another goal is to present a risk-based methodology for the guideline development which can be used in decision-making concerning what to do in case of any location class change. Particularly, it has given special attention to the requirements which are imposed for the pipeline operational license continuation. This work is of supreme importance for the Brazilian pipeline segment, since the existing Brazilian design standard, ABNT NBR12712 for transmission and distribution pipeline design, does not deal with that issue. Moreover, a summary of the main solutions found in those countries together with a guideline, customized for the Brazilian reality, is presented. (author)

  16. Coalbed methane : evaluating pipeline and infrastructure requirements to get gas to market

    International Nuclear Information System (INIS)

    Murray, B.

    2005-01-01

    This Power Point presentation evaluated pipeline and infrastructure requirements for the economic production of coalbed methane (CBM) gas. Reports have suggested that capital costs for CBM production can be minimized by leveraging existing oil and gas infrastructure. By using existing plant facilities, CBM producers can then tie in to existing gathering systems and negotiate third party fees, which are less costly than building new pipelines. Many CBM wells can be spaced at an equal distance to third party gathering systems and regulated transmission meter stations and pipelines. Facility cost sharing, and contracts with pipeline companies for compression can also lower initial infrastructure costs. However, transmission pressures and direct connect options for local distribution should always be considered during negotiations. The use of carbon dioxide (CO 2 ) commingling services was also recommended. A map of the North American gas network was provided, as well as details of Alberta gas transmission and coal pipeline overlays. Maps of various coal zones in Alberta were provided, as well as a map of North American pipelines. refs., tabs., figs

  17. AIRBORNE, OPTICAL REMOTE SENSING OF METHANE AND ETHANE FOR NATURAL GAS PIPELINE LEAK DETECTION

    Energy Technology Data Exchange (ETDEWEB)

    Jerry Myers

    2003-11-12

    Ophir Corporation was awarded a contract by the U. S. Department of Energy, National Energy Technology Laboratory under the Project Title ''Airborne, Optical Remote Sensing of Methane and Ethane for Natural Gas Pipeline Leak Detection'' on October 14, 2002. This second six-month technical report summarizes the progress made towards defining, designing, and developing the hardware and software segments of the airborne, optical remote methane and ethane sensor. The most challenging task to date has been to identify a vendor capable of designing and developing a light source with the appropriate output wavelength and power. This report will document the work that has been done to identify design requirements, and potential vendors for the light source. Significant progress has also been made in characterizing the amount of light return available from a remote target at various distances from the light source. A great deal of time has been spent conducting laboratory and long-optical path target reflectance measurements. This is important since it helps to establish the overall optical output requirements for the sensor. It also reduces the relative uncertainty and risk associated with developing a custom light source. The data gathered from the optical path testing has been translated to the airborne transceiver design in such areas as: fiber coupling, optical detector selection, gas filters, and software analysis. Ophir will next, summarize the design progress of the transceiver hardware and software development. Finally, Ophir will discuss remaining project issues that may impact the success of the project.

  18. Energy intensity, life-cycle greenhouse gas emissions, and economic assessment of liquid biofuel pipelines.

    Science.gov (United States)

    Strogen, Bret; Horvath, Arpad; Zilberman, David

    2013-12-01

    Petroleum fuels are predominantly transported domestically by pipelines, whereas biofuels are almost exclusively transported by rail, barge, and truck. As biofuel production increases, new pipelines may become economically attractive. Location-specific variables impacting pipeline viability include construction costs, availability and costs of alternative transportation modes, electricity prices and emissions (if priced), throughput, and subsurface temperature. When transporting alcohol or diesel-like fuels, pipelines have a lower direct energy intensity than rail, barge, and trucks if fluid velocity is under 1 m/s for 4-inch diameter pipelines and 2 m/s for 8-inch or larger pipelines. Across multiple hypothetical state-specific scenarios, profit-maximizing design velocities range from 1.2 to 1.9 m/s. In costs and GHG emissions, optimized pipelines outperform trucks in each state and rail and barge in most states, if projected throughput exceeds four billion liters/year. If emissions are priced, optimum design diameters typically increase to reduce pumping energy demands, increasing the cost-effectiveness of pipeline projects. Copyright © 2013 Elsevier Ltd. All rights reserved.

  19. The new gas law and the concession of use of pipeline; A nova lei do gas e a concessao para uso de gasoduto

    Energy Technology Data Exchange (ETDEWEB)

    Fiad, Patricia S. [Universidade do Estado do Rio de Janeiro (UERJ), RJ (Brazil). Faculdade de Direito; Lima, Juliana Cardoso de [Escritorio Doria, Jacobina, Rosado e Gondinho Advogados, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The development of the gas industry and the recent energy crises in Latin America demand an adequate answer from the legal framework. There are three main projects in course in Legislative which aim at regulating the gas industry specifically: Law Project n. 226 of 2005, of ex-senator Tourinho; Law Project n. 6.673 of 2006, of Executive; and Law Project n. 6.666 of 2006, of Deputy Luciano Zica. The pipeline is the materialization of the integration among the countries of the continent. The adoption of mechanisms to make feasible the regional integration and to stimulate the private sector, in order to react against the progressive deficit between consumption and exploration of energy, becomes fundamental to the industry. In compliance with the current legislation, the transportation of gas is made through authorization. The discussion focus on the possibility of public tender for concession of the service and how it would stimulate the market. (author)

  20. The limits to deregulation of entry and expansion of the US gas pipeline industry

    International Nuclear Information System (INIS)

    Rosput, P.G.

    1993-01-01

    US consumers of natural gas have enjoyed significant benefits as the pricing of the commodity has been deregulated. Thanks in large part to the success of deregulation of the natural gas commodity. US federal regulators have embarked upon a wide-ranging programme of eliminating barriers to entry and expansion of natural gas pipelines, which have traditionally been regulated as natural monopolies. As a result, there is now significant excess capacity in the natural gas transmission sector, without measurable benefits to consumers. (author)

  1. The impact of the Vancouver Island natural gas pipeline construction on water quality

    International Nuclear Information System (INIS)

    Li Gaoshe.

    1993-04-01

    A study was initiated to evaluate the impact of construction of the Vancouver Island natural gas pipeline on water quality, where the pipeline passed along or through lakes and streams. The main concern was for the potential defilement of community water supplies when construction occurred in community watersheds. When water becomes turbid from rainfall runoff passing through construction areas, disinfection processes are rendered inefficacious and at specified turbidity levels, the water becomes too risky to drink without alternative disinfection such as boiling. The weekly environmental surveillance reports generated during construction are reviewed. The material is organized to relate construction practices with weather patterns, thereby showing the resultant effects on water quality (turbidity). The effectiveness of construction measures in reducing the risk of contamination and water turbidity at intakes is assessed. Generally, water turbidity during project construction was acceptable although it sometimes reached very high levels. These high levels resulted from incidents or mistakes that were usually related to rainy days. Among the 12 types of work activity, bridge construction, drilling, and grading caused relatively slight increases in water turbidity levels, while backfilling and ditching caused the greatest increase in turbidity. Improvements in inspection and monitoring programs are recommended. A key recommendation is that construction work be stopped on rainy days. 6 refs., 4 figs., 20 tabs

  2. Development of a new solvent-free flow efficiency coating for natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Fogg, Graham A.; Morse, Jennifer [Bredero Shaw, Houston, TX (United States)

    2005-07-01

    Pipeline design engineers have traditionally considered external anti-corrosion coatings for the protection of gas transmission pipelines, with less consideration given to the benefits of internal flow efficiency coatings. This paper reviews the benefits of using a traditional solvent-based flow efficiency coating, and the relationship between the internal surface roughness of a pipe, the pressure drop across the pipeline, and the maximum flow rate of gas through the pipeline. To improve upon existing solvent-based flow efficiency coatings, a research program was undertaken to develop a solvent-free coating. The stages in the development of this coating are discussed, resulting in the plant application of the coating and final qualification to API RP 5L2. (author)

  3. Measurement of flow characteristics of solid particles mixed with gas in pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Siberev, S P; Nazarov, S I; Soldatkin, G I

    1983-01-01

    A mathematical model of the interaction of solid particles in a gas stream flowing through a pipeline comprises equations for the energy and material balances in the system and for force and energy interactions between the solid particles and transducers located within the pipeline. Soviet researchers confirmed that the average value of stress recorded by a transducer is proportional to the average kinetic energy of the particles; for a constant particle speed, the stress is proportional to the mass flow of the particles. The analysis and flow transducer measurements are valuable in measuring and controlling flowline sand and soil in natural gas transport from gas wells and undergound storage facilities.

  4. Leakage Risk Assessment of CO{sub 2} Transportation by Pipeline at the Illinois Basin Decatur Project, Decatur, Illinois

    Energy Technology Data Exchange (ETDEWEB)

    Mazzoldi, A.; Oldenburg, C. M.

    2013-12-17

    The Illinois Basin Decatur Project (IBDP) is designed to confirm the ability of the Mt. Simon Sandstone, a major regional saline-water-bearing formation in the Illinois Basin, to store 1 million tons of carbon dioxide (CO{sub 2}) injected over a period of three years. The CO{sub 2} will be provided by Archer Daniels Midland (ADM) from its Decatur, Illinois, ethanol plant. In order to transport CO{sub 2} from the capture facility to the injection well (also located within the ADM plant boundaries), a high-pressure pipeline of length 3,200 ft (975 m) has been constructed, running above the ground surface within the ADM plant footprint. We have qualitatively evaluated risks associated with possible pipeline failure scenarios that lead to discharge of CO{sub 2} within the real-world environment of the ADM plant in which there are often workers and visitors in the vicinity of the pipeline. There are several aspects of CO{sub 2} that make its transportation and potential leakage somewhat different from other substances, most notable is its non-flammability and propensity to change to solid (dry ice) upon strong decompression. In this study, we present numerical simulations using Computational Fluid Dynamics (CFD) methods of the release and dispersion of CO{sub 2} from individual hypothetical pipeline failures (i.e., leaks). Failure frequency of the various components of a pipeline transportation system over time are taken from prior work on general pipeline safety and leakage modeling and suggest a 4.65% chance of some kind of pipeline failure over the three-years of operation. Following the Precautionary Principle (see below), we accounted for full-bore leakage scenarios, where the temporal evolution of the mass release rate from the high-pressure pipeline leak locations was simulated using a state-of-the-art Pipe model which considers the thermodynamic effects of decompression in the entire pipeline. Failures have been simulated at four representative locations along

  5. Risk Analysis on Leakage Failure of Natural Gas Pipelines by Fuzzy Bayesian Network with a Bow-Tie Model

    OpenAIRE

    Shan, Xian; Liu, Kang; Sun, Pei-Liang

    2017-01-01

    Pipeline is the major mode of natural gas transportation. Leakage of natural gas pipelines may cause explosions and fires, resulting in casualties, environmental damage, and material loss. Efficient risk analysis is of great significance for preventing and mitigating such potential accidents. The objective of this study is to present a practical risk assessment method based on Bow-tie model and Bayesian network for risk analysis of natural gas pipeline leakage. Firstly, identify the potential...

  6. Risk assessment in gas and oil pipelines based on the fuzzy Bow-tie technique

    OpenAIRE

    P. Heyrani; A. Baghaei

    2016-01-01

    Introduction: Nowadays, gas and oil account for 60 percent of world energy resources. Transporting crude oil and its products are accomplished through a number of ways among which pipelines are of the utmost significance. Considering the extent of pipelines in installation and residential areas and also high potential for damage, the safety of these pipes and application of risk management principles have undeniable importance. Bow-tie risk assessment method is one of the ways to determine sa...

  7. Hierarchical Leak Detection and Localization Method in Natural Gas Pipeline Monitoring Sensor Networks

    OpenAIRE

    Ning Yu; Renjian Feng; Jiangwen Wan; Yinfeng Wu; Yang Yu

    2011-01-01

    In light of the problems of low recognition efficiency, high false rates and poor localization accuracy in traditional pipeline security detection technology, this paper proposes a type of hierarchical leak detection and localization method for use in natural gas pipeline monitoring sensor networks. In the signal preprocessing phase, original monitoring signals are dealt with by wavelet transform technology to extract the single mode signals as well as characteristic parameters. In the initia...

  8. Pipeline dreams face up to reality

    International Nuclear Information System (INIS)

    Ryan, Orla

    1999-01-01

    This article gives details of two gas pipelines which are expected to be built in Turkey to meet the estimated demand for gas. The Bluestream joint ENI/Gasprom project pipeline will convey Russian gas across the Black Sea to Turkey, and the PSG joint Bechtel/General Electric venture will bring gas from Turkmenistan to Turkey across the Caspian Sea. Construction of the pipelines and financing aspects are discussed. (uk)

  9. THE DEVELOPMENT AND THE STRATEGY OF THE OIL AND GAS PIPELINES OF RUSSIA

    Science.gov (United States)

    Motomura, Masumi

    The Russian oil and gas industry earns more than half of the Russian tax revenue and foreign currency, and has been playing the role of the backbone of the state economy through the eras of the Soviet Union and the Russian Federation. With the elongation of distance to the European market from the oil producing regions, starting from Baku in the era of Imperial Russia to the Second Baku (Volga-Ural) and the third Baku (West Siberia) in turn, the role of the oil pipeline system as the transportation infrastructure became more and more important and the deployment of pipelines has become one of the indispensable pillars of oil strategy. Now, the oil pipeline network is to reach the Pacific Ocean, which will enable Northeast Asia to be added as a destination for Russian oil, with a result of expanding influence for Russia in these regions. On the other hand, gas exports from the Soviet Union to Eastern Europe started in 1967 by constructing a trunk pipeline from Ukraine, which was extended to West Germany in 1973, overcoming the confrontation between the East and the West and becoming a regional stabilizer. The United States considered this pipeline as an energy weapon and criticized this deal by saying that when Soviet gas flows to Western Europe, its political influence must flow like the gas itself. However, the Soviet Union collapsed in 1991, while gas transportation continued without any disruption. This is evidence that the gas pipeline from the Soviet Union was purely for a business purpose and was not politicized. Recently, Russia is aiming to export gas to northeastern Asia, which is expected to be a new stabilizer in this region, although different types of diffi culties (especially about the method of determination of the gas price) still need to be resolved.

  10. Technology assessment of long distance liquid natural gas pipelines. Phase 9. Available and/or required equipment

    Energy Technology Data Exchange (ETDEWEB)

    1977-02-01

    This phase of the technology assessment of liquid natural gas pipelines assembles a listing of the materials and equipment which might be used to mechanically build an LNG pipeline. It lists material and equipment which practically could be used in such a pipeline either at a present state of the art, or by adaptation in terms of materials or techniques, or after some development work. Other than that the material and equipment is proposed for use in an LNG pipeline, no new real concept of pipeline or refrigeration plant equipment is proposed. Rather the equipment has been selected so as to conform as closely as possible to established pipeline practice.

  11. Risk analysis of urban gas pipeline network based on improved bow-tie model

    Science.gov (United States)

    Hao, M. J.; You, Q. J.; Yue, Z.

    2017-11-01

    Gas pipeline network is a major hazard source in urban areas. In the event of an accident, there could be grave consequences. In order to understand more clearly the causes and consequences of gas pipeline network accidents, and to develop prevention and mitigation measures, the author puts forward the application of improved bow-tie model to analyze risks of urban gas pipeline network. The improved bow-tie model analyzes accident causes from four aspects: human, materials, environment and management; it also analyzes the consequences from four aspects: casualty, property loss, environment and society. Then it quantifies the causes and consequences. Risk identification, risk analysis, risk assessment, risk control, and risk management will be clearly shown in the model figures. Then it can suggest prevention and mitigation measures accordingly to help reduce accident rate of gas pipeline network. The results show that the whole process of an accident can be visually investigated using the bow-tie model. It can also provide reasons for and predict consequences of an unfortunate event. It is of great significance in order to analyze leakage failure of gas pipeline network.

  12. Advanced cost-effective surface geochemical techniques for oil/gas/uranium exploration, environmental assessments and pipeline monitoring - a template for India

    International Nuclear Information System (INIS)

    Lafleur, Paul; Chanrasekharan, G.Y.V.N.; Rajender Rao, S.

    2011-01-01

    Advanced geochemical soil gas methods have been successfully developed for the exploration of oil/gas/uranium and for environmental assessments. Application of these cost-effective technologies in India can substantially reduce exploration risk while accelerating the development of oil/gas/uranium onshore resources. A reliable and effective monitoring system using geochemical soil gas surveys ensures that CO 2 Enhanced Oil Recovery operations as well as CO 2 sequestration projects are safe and acceptable for the disposal of CO 2 , Soil gas surveys along with other technologies can also be applied for monitoring of oil/gas pipelines for leakage, especially those that are old or pass through populated regions

  13. Oilfield Flare Gas Electricity Systems (OFFGASES Project)

    Energy Technology Data Exchange (ETDEWEB)

    Rachel Henderson; Robert Fickes

    2007-12-31

    The Oilfield Flare Gas Electricity Systems (OFFGASES) project was developed in response to a cooperative agreement offering by the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) under Preferred Upstream Management Projects (PUMP III). Project partners included the Interstate Oil and Gas Compact Commission (IOGCC) as lead agency working with the California Energy Commission (CEC) and the California Oil Producers Electric Cooperative (COPE). The project was designed to demonstrate that the entire range of oilfield 'stranded gases' (gas production that can not be delivered to a commercial market because it is poor quality, or the quantity is too small to be economically sold, or there are no pipeline facilities to transport it to market) can be cost-effectively harnessed to make electricity. The utilization of existing, proven distribution generation (DG) technologies to generate electricity was field-tested successfully at four marginal well sites, selected to cover a variety of potential scenarios: high Btu, medium Btu, ultra-low Btu gas, as well as a 'harsh', or high contaminant, gas. Two of the four sites for the OFFGASES project were idle wells that were shut in because of a lack of viable solutions for the stranded noncommercial gas that they produced. Converting stranded gas to useable electrical energy eliminates a waste stream that has potential negative environmental impacts to the oil production operation. The electricity produced will offset that which normally would be purchased from an electric utility, potentially lowering operating costs and extending the economic life of the oil wells. Of the piloted sites, the most promising technologies to handle the range were microturbines that have very low emissions. One recently developed product, the Flex-Microturbine, has the potential to handle the entire range of oilfield gases. It is deployed at an oilfield near Santa Barbara to run on waste gas

  14. Risk-targeted safety distance of reinforced concrete buildings from natural-gas transmission pipelines

    International Nuclear Information System (INIS)

    Russo, Paola; Parisi, Fulvio

    2016-01-01

    Natural-gas pipeline accidents mostly result in major damage even to buildings located far away. Therefore, proper safety distances should be observed in land use planning to ensure target safety levels for both existing and new buildings. In this paper, a quantitative risk assessment procedure is presented for the estimation of the annual probability of direct structural damage to reinforced concrete buildings associated with high-pressure natural-gas pipeline explosions. The procedure is based on Monte Carlo simulation and takes into account physical features of blast generation and propagation, as well as damage to reinforced concrete columns. The natural-gas jet release process and the flammable cloud size are estimated through SLAB one-dimensional integral model incorporating a release rate model. The explosion effects are evaluated by a Multi-Energy Method. Damage to reinforced concrete columns is predicted by means of pressure–impulse diagrams. The conditional probability of damage was estimated at multiple pressure–impulse levels, allowing blast fragility surfaces to be derived at different performance limit states. Finally, blast risk was evaluated and allowed the estimation of minimum pipeline-to-building safety distances for risk-informed urban planning. The probabilistic procedure presented herein may be used for performance-based design/assessment of buildings and to define the path of new natural-gas pipeline networks. - Highlights: • The safety of buildings against blast loads due to pipeline accidents is assessed. • A probabilistic risk assessment procedure is presented for natural-gas pipelines. • The annual risk of collapse of reinforced concrete building columns is evaluated. • Monte Carlo simulation was carried out considering both pipeline and column features. • A risk-targeted safety distance is proposed for blast strength class 9.

  15. Economic evaluation of pipeline construction and capacity expansion projects; Avaliacao economica dos projetos de construcao e expansao de um gasoduto de transporte

    Energy Technology Data Exchange (ETDEWEB)

    Machado, Leandro Bastos [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    In this work, two investment projects that are characteristic of the recent phase of the Brazilian natural gas industry were economically valued, taking into account the government going Thermoelectric Priority Program or PPT: economical design of a gas pipeline, to be built and operated by a Proprietary Carrier, where the interest variable is the transport tariff that will remunerate the investment and pipeline expansion through compressor stations, sponsored by the only shipper in the system, as it aims at selling gas to a thermoelectric plant, where the interest variable is the net present value of the project. In both cases, some sensitive analyses of the interest variable to variables that carry greater uncertainty are presented. Results show that pipeline expansion is viable. (author)

  16. Brazil-Bolivia natural gas project challenges and solutions

    International Nuclear Information System (INIS)

    Costa, A.S.C.

    1993-01-01

    PETROBRAS, the Brazilian/International Integrated Oil and Gas Company, is leading US$ 4 billion natural gas project. The goal of this paper is to identify Project challenges and propose solutions. It starts with fundamentals. Natural gas' share in Brazilian primary energy demand is only 2%. Economic aspects and environmental concerns, however, are changing this picture. For the Bolivian economy to be linked to a relatively huge market, in the long-term, is certainly a suitable decision. Besides, this Project will promote regional integration, within and outside Marcosur economies. Reserves, market data and economics give support to a feasible Project Financial structure is the main challenge. INTERGAS, a new subsidiary of PETROBRAS is opened for 49% stock to private sector participation. As an integrated Project, many opportunities will be generated during construction and operation. E ampersand P, pipeline and downstream investments could bring different investors to different sectors

  17. Gas purification project

    International Nuclear Information System (INIS)

    Broothaerts, J.; Claes, J.; Collard, G.; Goossens, W.; Harnie, R.; Heylen, P.; Vaesen, J.; Beukelaer, R. de; Dubois, G.; Glibert, R.; Mestrez, J.; Zahlen, A.

    1975-06-01

    Conceptual and experimental studies on LMFBR reprocessing and reactor off-gas purification systems are summarized. Iodine sorption on zeolites, low-temperature adsorption of noble gases on charcoal and catalytic oxidation of hydrogen, simulating tritium, are being studied in laboratory set-ups. A pilot loop with 25 m 3 h -1 throughput has been constructed. Results are quoted from the first phase of the iodine removal programme by scrubbing systems. Further extension of the test loop, comprising off-gases conditioning to removal of krypton in a cryodistillation unit, has been prepared. Delay-bed studies on 133 Xe extraction from LWR off-gases are reported. (author)

  18. Effects of Pipeline Construction on Wetland Ecosystems: Russia-China Oil Pipeline Project (Mohe-Daqing Section)

    Energy Technology Data Exchange (ETDEWEB)

    Xiaofei Yu; Guoping Wang; Yuanchun Zou; Qiang Wang; Hongmei Zhao; Xianguo Lu (Key Lab of Wetland Ecology and Environment, Northeast Inst. of Geography and Agroecology, Changchun (China)), e-mail: wangguoping@neigae.ac.cn

    2010-07-15

    Although the multiple roles of wetland ecosystems and their value to humanity have been increasingly understood and documented in recent years, the efforts to conserve and restore wetlands are not in harmony with the press for high speed of economy growth. The degradation of wetlands is proceeding, especially in China. Russia- China Oil Pipe-line Project (Mohe-Daqing Section) has already begun in May 2009, and is ongoing. The pipeline runs through four riverine wetlands and two marshlands of Heilongjiang Province, Northeast China. Although the project has vital significance of mitigating the energy crisis as well as guaranteeing the energy security of China, it will bring a series of ecological and environmental problems, especially for wetland ecosystems

  19. A mathematical framework for modelling and evaluating natural gas pipeline networks under hydrogen injection

    Energy Technology Data Exchange (ETDEWEB)

    Tabkhi, F.; Azzaro-Pantel, C.; Pibouleau, L.; Domenech, S. [Laboratoire de Genie Chimique, UMR5503 CNRS/INP/UPS, 5 rue Paulin Talabot F-BP1301, 31106 Toulouse Cedex 1 (France)

    2008-11-15

    This article presents the framework of a mathematical formulation for modelling and evaluating natural gas pipeline networks under hydrogen injection. The model development is based on gas transport through pipelines and compressors which compensate for the pressure drops by implying mainly the mass and energy balances on the basic elements of the network. The model was initially implemented for natural gas transport and the principle of extension for hydrogen-natural gas mixtures is presented. The objective is the treatment of the classical fuel minimizing problem in compressor stations. The optimization procedure has been formulated by means of a nonlinear technique within the General Algebraic Modelling System (GAMS) environment. This work deals with the adaptation of the current transmission networks of natural gas to the transport of hydrogen-natural gas mixtures. More precisely, the quantitative amount of hydrogen that can be added to natural gas can be determined. The studied pipeline network, initially proposed in [1] is revisited here for the case of hydrogen-natural gas mixtures. Typical quantitative results are presented, showing that the addition of hydrogen to natural gas decreases significantly the transmitted power: the maximum fraction of hydrogen that can be added to natural gas is around 6 mass% for this example. (author)

  20. Mechanical Characteristics of Submerged Arc Weldment in API Gas Pipeline Steel of Grade X65

    International Nuclear Information System (INIS)

    Hashemi, S. H.; Mohammadyani, D.

    2011-01-01

    The mechanical properties of submerged arc weldment (SAW) in gas transportation pipeline steel of grade API X65 (65 ksi yield strength) were investigated. This steel is produced by thermo mechanical control rolled (TMC), and is largely used in Iran gas piping systems and networks. The results from laboratory study on three different regions; i.e. base metal (BM), fusion zone (FZ) and heat affected zone (HAZ) were used to compare weldment mechanical characteristics with those specified by API 5L (revision 2004) standard code. Different laboratory experiments were conducted on test specimens taken from 48 inch outside diameter and 14.3 mm wall thickness gas pipeline. The test results showed a gradient of microstructure and Vickers hardness data from the centerline of FZ towards the unaffected MB. Similarly, lower Charpy absorbed energy (compared to BM) was observed in the FZ impact specimens. Despite this, the API specifications were fulfilled in three tested zones, ensuring pipeline structural integrity under working conditions.

  1. Integrated failure probability estimation based on structural integrity analysis and failure data: Natural gas pipeline case

    International Nuclear Information System (INIS)

    Dundulis, Gintautas; Žutautaitė, Inga; Janulionis, Remigijus; Ušpuras, Eugenijus; Rimkevičius, Sigitas; Eid, Mohamed

    2016-01-01

    In this paper, the authors present an approach as an overall framework for the estimation of the failure probability of pipelines based on: the results of the deterministic-probabilistic structural integrity analysis (taking into account loads, material properties, geometry, boundary conditions, crack size, and defected zone thickness), the corrosion rate, the number of defects and failure data (involved into the model via application of Bayesian method). The proposed approach is applied to estimate the failure probability of a selected part of the Lithuanian natural gas transmission network. The presented approach for the estimation of integrated failure probability is a combination of several different analyses allowing us to obtain: the critical crack's length and depth, the failure probability of the defected zone thickness, dependency of the failure probability on the age of the natural gas transmission pipeline. A model's uncertainty analysis and uncertainty propagation analysis are performed, as well. - Highlights: • Degradation mechanisms of natural gas transmission pipelines. • Fracture mechanic analysis of the pipe with crack. • Stress evaluation of the pipe with critical crack. • Deterministic-probabilistic structural integrity analysis of gas pipeline. • Integrated estimation of pipeline failure probability by Bayesian method.

  2. Effects of development of a natural gas well and associated pipeline on the natural and scientific resources of the Fernow Experimental Forest

    Science.gov (United States)

    Mary Beth Adams; Pamela J. Edwards; W. Mark Ford; Joshua B. Johnson; Thomas M. Schuler; Melissa Thomas-Van Gundy; Frederica Wood

    2011-01-01

    Development of a natural gas well and pipeline on the Fernow Experimental Forest, WV, raised concerns about the effects on the natural and scientifi c resources of the Fernow, set aside in 1934 for long-term research. A case study approach was used to evaluate effects of the development. This report includes results of monitoring projects as well as observations...

  3. Analysis of hydrodynamic regimes of operation of a gas pipeline from the Samotlor field to the Nizhnevartovsk gas refinery

    Energy Technology Data Exchange (ETDEWEB)

    Al' tshular, S A; Bragunov, N I; Ivanov, V N; Izmaylov, I Ye; Koroleva, L N

    1979-01-01

    Results are presented from studying the hydraulic losses of a gas-transport system. Oil gas in the first stage of separation of the Samotlor field according to the plan is transported on two gas pipelines to the Nizhnevartovsk and Belozersk gas refinery. On the route of the first gas pipeline in order to remove the released condensate, 12 gas-separator and condensate-settling tanks are installed. The second gas pipeline in the beginning, middle and end has asemblies for additional separation (separation (separator, drop-separator, condensate-collector). The studied material is presented in the form of the dependence of actual calculatedcoefficients of hydraulic resistance on the rate of gas supply in the range 80,000-230,000 m/sup 3//h (Re-(0.82.0) X 10/sup -6/. It has been established that with Re=1.6 X 10/sup -6/ the calculated and actual coeffic-ients of resistance become the same, while with smaller values of Re, the actual values exceed the calculated by 20-40%. In the opinion of the authors this difference is due to the effect of the liquid phase with low velocities of gas and the formation of stable foam. As a result of transillumination it was also established that the regime of flow on the ascending part is dispersion-ring and dispersion-semiring, and on the descending part stratified. Analysis of the transport of the gas-condensate stream with ring regime of flow permitted the authors to hypothesize transporting of gas without removal of the condensate. A certain increase in the coefficients of resistance for the case where the condensate is not removed from the gas pipeline is noted with experimental realization of the proposed variant. It is explained by the low velocities of gas in the beginning of the gas pipeline. It is stressed that the actual and calculated pressure differentials are distinguished less than the calculated and actual coefficients of resistance and that this indicates the practical preservation of the throughput of the gas pipeline.

  4. Application of Flash Setting Material for Temporary Earthquake Disaster Restoration of Gas Pipelines Using Fly Ash Cement Mixtures

    OpenAIRE

    Shimada, Hideki; Sasaoka, Takashi; Matsui, Kikuo; 島田, 英樹; 笹岡, 孝司; 松井, 紀久男

    2010-01-01

    There are many earthquakes in Japan. If a large earthquake were to occur, it is necessary to consider how pipelines such as: gas, sewage, telecommunications, and so on are restored quickly. At that time, damaged gas pipelines are very dangerous because fire in large areas could be caused by the leakage of gas from the damaged pipeline. Accordingly, it is necessary for gas companies to stop the supply of gas to houses over a large area. Once the gas supply is stopped, there is a considerable a...

  5. Useful effectiveness of plastic pipes for gas pipelines operating at low pressure

    Energy Technology Data Exchange (ETDEWEB)

    Zayutsev, K I

    1976-06-01

    Because a significant portion of the feeder lines in the Soviet union operate at relatively low pressures up to 75 to 150 psi, it is economically feasible to replace the conventional pipeline material (steel) with plastic. Cost savings result from lower material costs and ease of laying plastic pipe. Because of stiffness and corrosion requirements, the steel pipe used for these low-pressure pipelines is much thicker than needed to withstand the pressure used. Data are tabulated on the comparative costs and manpower requirements for the construction of 1 km of steel, polyvinyl chloride, and polyethylene gas pipelines ranging in diameter from 3 to 14 in. Generally, the plastic pipelines required 15 to 30% less man-days and were 20 to 35% lower in cost to build. The plastic pipelines can operate at 150 to 175 psi pressure and at temperatures up to 100 to 140/sup 0/F. In research conducted at VNIIST (All-Union Research Institute for the Construction of Trunk Pipelines) on plastic pipelines, a 2.5-mile test section has been operating successfully for 2 years, and new techniques and equipment for joining plastic pipe up to 25-in. diameter are being developed.

  6. Field experience with a novel pipe protection and monitoring system for large offshore pipeline construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Magerstaedt, Michael; Blitz, Gunther [ROSEN Swiss AG, Stans (Switzerland); Sabido, Carlos E. [ROSEN Technology and Research Center, Lingen (Germany)

    2012-07-01

    For pipe joints stored during large-scale offshore pipeline construction projects, corrosion protection as well as protection from physical damage of pipelines is very important. Integrity Management does not just start with the operation of a pipeline. In the past, with the much lower risks and cost at stake in on shore constriction, this factor was often overlooked. Sometimes, newly laid pipelines failed upon hydrostatic testing or even during operation. Causes were corrosion or damage the pipe joints took before pipeline laying. For offshore projects, the cost and consequences associated with such failures are orders of magnitude higher and must be avoided by all means. Within six months from the conception of the idea, a system was developed and deployed that protected (and in part still protects) a large number of pipe joints used in a European offshore gas pipeline project more than 2000 km. The pipe joints were physically protected from corrosion, interior contamination, and condensation. At the same time, the system provided real-time monitoring of more than 100'000 pipe joints stored at 5 storage yards distributed over 3 countries with distances of more than 1200 km apart from each other. Every single joint was identified with its location and status at every time during the storage period. Any third-party interference was transmitted to a central control room in real time as well. Protection of the pipe joints was provided vs.: corrosion of pipe joint end cutbacks exposed to the maritime climate for up to 2 years; contamination of the pipe interior by: foreign material, dirt, water, ice, animals. Third party damage to the pipe joints; damage to the protection system or to the transmission network; fire; theft of pipe joints or other equipment. System features were: modular pipe caps that, protect the pipe interior, cover both inner and outer cutback, allow ventilation of the pipe interior, continuously monitor each pipe joint for third party damage

  7. Applications of ZigBee Technology in the Safety Monitoring System of Low Gas Pipeline Transportation

    Directory of Open Access Journals (Sweden)

    Wei Deyu

    2015-01-01

    Full Text Available The existing safety monitoring system of low gas pipeline transportation establishes a wired communication network monitoring system mainly on the basis of industrial bus. It has problems such as large transmission signal attenuation, complex wiring, high-labor intensity, inconvenient installation and maintenance, high maintenance cost, and so on. Featuring low cost, power-saving, reliability, stability and flexibility, the wireless sensor network established by ZigBee wireless communication technology can realize the real-time all-dimensional dynamic monitoring on parameters of low gas pipeline transportation system and overcome the shortcomings and deficiencies of wired network system.

  8. Electrostatic sensors applied to the measurement of electric charge transfer in gas-solids pipelines

    International Nuclear Information System (INIS)

    Woodhead, S R; Denham, J C; Armour-Chelu, D I

    2005-01-01

    This paper describes the development of a number of electric charge sensors. The sensors have been developed specifically to investigate triboelectric charge transfer which takes place between particles and the pipeline wall, when powdered materials are conveyed through a pipeline using air. A number of industrial applications exist for such gas-solids pipelines, including pneumatic conveyors, vacuum cleaners and dust extraction systems. The build-up of electric charge on pipelines and powdered materials can lead to electrostatic discharge and so is of interest from a safety viewpoint. The charging of powders can also adversely affect their mechanical handling characteristics and so is of interest to handling equipment engineers. The paper presents the design of the sensors, the design of the electric charge test rig and electric charge measurement test results

  9. Competition in the natural gas pipeline industry: An economic policy analysis

    International Nuclear Information System (INIS)

    Gallick, E.C.

    1993-01-01

    The Federal Energy Regulatory Commission (FERC) currently regulates the price at which natural gas can be sold by regulated interstate natural gas pipelines. Whether pipelines should be deregulated depends, to an important extent, on the competitive nature of the market. The key question is whether pipelines can successfully raise price (i.e., the transport fee) and reduce output if the market is deregulated. In most natural gas pipeline markets, there are a small number of current suppliers. Opponents of deregulation argue that the unrestrained market power of pipelines in many local markets will introduce inefficiencies in the sale of natural gas. Implicit in their arguments is a narrow view of competition: the number of current suppliers. The competitive effect of potential entry is largely ignored. These commentators would argue that without potential entry, it may be true that the net social cost of deregulation exceeds the costs of maintaining present regulation. A study was conducted to determine the extent to which potential entry might constrain the exercise of market power by natural gas pipelines if price and entry regulation is removed. Potential entrants are defined in the context of antitrust markets. That is, these markets are consistent with the Department of Justice (DOJ) Merger Guidelines. The study attempts to quantify the effects of potential entry on the market power of current suppliers. The selection of potential entrants therefore considers a number of factors (such as the size of the nearby supplier and the distance to the market) that are expected to affect the likelihood of collision in a deregulated market. The policy implications of the study are reviewed

  10. North American natural gas pipeline and supply update

    International Nuclear Information System (INIS)

    Molyneaux, M.

    1999-01-01

    A series of overhead viewgraphs accompanied this presentation which presented an update of North American natural gas supply. Some of the graphs depicted the following: (1) natural gas consumption in the United States, (2) U.S. imports of Canadian natural gas, (3) natural gas prices differential: Henry Hub versus Empress, (4) natural gas production in the U.S., and (5) Baker Hughes active rig count, U.S. gas rigs. First Energy's view of U.S. natural gas supply is that the estimate of 50.0 Bcf/d for U.S. domestic production is looking too high. The first quarter 1999 exit production rates are behind expectations. U.S. domestic natural gas expenditure budgets are still down by more than 40 per cent compared to 1998 levels. The impact that this will have on prices was discussed. 21 figs

  11. Big gas project for Australia

    International Nuclear Information System (INIS)

    Jemain, A.

    2005-01-01

    Australia is re-launching its ambitions in liquefied natural gas (LNG) with the Greater Gorgon project of offshore exploitation of the natural gas reserves of the continental shelf of NW Australia. These reserves would represent 200 million tons of LNG which will be exported towards China and USA. The project will cost 11 billion dollars and will yield 2 billion dollars per year. It is managed by a consortium which groups together Chevron Corp. (50%), Shell (25%) and ExxonMobil (25%). Technip company is partner of the project. The China National Offshore Oil Corp (CNOOC) has announced its intention to become also partner of the project, and maybe Japan, South Korea and Taiwan will wish too. Short paper. (J.S.)

  12. Comparison study on qualitative and quantitative risk assessment methods for urban natural gas pipeline network.

    Science.gov (United States)

    Han, Z Y; Weng, W G

    2011-05-15

    In this paper, a qualitative and a quantitative risk assessment methods for urban natural gas pipeline network are proposed. The qualitative method is comprised of an index system, which includes a causation index, an inherent risk index, a consequence index and their corresponding weights. The quantitative method consists of a probability assessment, a consequences analysis and a risk evaluation. The outcome of the qualitative method is a qualitative risk value, and for quantitative method the outcomes are individual risk and social risk. In comparison with previous research, the qualitative method proposed in this paper is particularly suitable for urban natural gas pipeline network, and the quantitative method takes different consequences of accidents into consideration, such as toxic gas diffusion, jet flame, fire ball combustion and UVCE. Two sample urban natural gas pipeline networks are used to demonstrate these two methods. It is indicated that both of the two methods can be applied to practical application, and the choice of the methods depends on the actual basic data of the gas pipelines and the precision requirements of risk assessment. Crown Copyright © 2011. Published by Elsevier B.V. All rights reserved.

  13. Modeling the Phase Composition of Gas Condensate in Pipelines

    Science.gov (United States)

    Dudin, S. M.; Zemenkov, Yu D.; Shabarov, A. B.

    2016-10-01

    Gas condensate fields demonstrate a number of thermodynamic characteristics to be considered when they are developed, as well as when gas condensate is transported and processed. A complicated phase behavior of the gas condensate system, as well as the dependence of the extracted raw materials on the phase state of the deposit other conditions being equal, is a key aspect. Therefore, when designing gas condensate lines the crucial task is to select the most appropriate methods of calculating thermophysical properties and phase equilibrium of the transported gas condensate. The paper describes a physical-mathematical model of a gas-liquid flow in the gas condensate line. It was developed based on balance equations of conservation of mass, impulse and energy of the transported medium within the framework of a quasi-1D approach. Constitutive relationships are given separately, and practical recommendations on how to apply the research results are provided as well.

  14. Traditional and incentive regulation - applications to natural gas pipelines in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Mansell, R.L.; Church, J.R.

    1995-12-31

    A study was conducted to examine alternative regimes for the regulation of major natural gas pipelines in Canada, with the specific objective of clarifying and analyzing key issues relating to these regulatory alternatives. An overview of the development and structure of the gas pipeline industry and a discussion of the main changes in the market and regulatory environment was included. The appropriateness of greater tolling flexibility and the role that competition plays in optimizing the use of existing pipelines was also discussed. Some of the incentive alternatives included price caps, automatic rate adjustment mechanisms, yardstick competition, profit sharing, benchmarking, capital cost incentives, and franchising. An evaluation of each alternative was provided. Examination of the various alternatives led to the conclusion that none of the new-style incentive regimes represent a panacea, nor is any of them uniformly better in terms of the key evaluation criteria than the traditional cost of service (COS) approach, especially that which incorporates streamlining. 163 refs., 13 figs.

  15. Chile's pipelines - who's out in the cold?

    International Nuclear Information System (INIS)

    Bellhouse, G.

    1998-01-01

    There is a battle on in Northern Chile to supply the region with gas and electricity. Two pipelines and a transmission line are being built, but there is insufficient demand to merit the construction of all of these projects. It is widely believed that the first pipeline to be finished will be the overall winner, but the situation is not that simple. A more sensible conclusion could be the merger of the two pipeline projects, rationalising supply of gas to the region. (Author)

  16. Simulating security of supply effects of the Nabucco and South Stream projects for the European natural gas market

    Energy Technology Data Exchange (ETDEWEB)

    Dieckhoener, Caroline

    2010-12-15

    Due to the increasing European import dependency, significant additional natural gas volumes will be required. In addition to the Nord Stream pipeline, the Nabucco and South Stream pipeline are projects planned for the next decade to provide further gas supplies to the European market. As one of the European Union's energy policies' foci is security of supply, the question can be raised if and how these projects contribute to this objective not only in terms of diversification but also in case of supply disruptions such as occurred in 2009 during the Russia-Ukraine gas crisis. This paper discusses the impact of these two major gas import pipeline projects on the South-Eastern Europe gas supply and analyzes their effects on gas flows and marginal cost prices in general and in case of gas supply disruptions via Ukraine in a model-based analysis with the European natural gas infrastructure and dispatch model TIGER. (orig.)

  17. A study on the development of repair procedure for gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Kim, W S; Kim, Y P; Baek, J H [R and D Center, Korea Gas Corporation, Ansan (Korea)

    1999-06-01

    In the buried natural gas pipelines, many defects may occur by construction faults, corrosion, third-party interference and ground movement. When a segment of a pipeline is found to be defective, one of the repair methods is to remove its contents and cut out the defective segment after shutting down the pipeline. However, the cost is extremely high in terms of venting and disrupting the gas supply. Therefore, most pipeline companies have developed in-service repair methods without removing the line from service. In general, in order to avoid removing the line from service, direct deposition of weld metal, full-encirclement sleeve, patches, stopple fittings, half-sole and branch connections are required. There are three important concerns in the sleeve-repair welding like other methods of in-service repair-welding. The first concern is the possibility of burn-through which is due to the localized heating and loss of meterial strength on the inner surface of pipe during the welding process. The pipe wall may burst under internal pressure if the loss in strength is too great. The second concern is the high cooling rates by the flowing gas which quickly removes heat from the pipe wall, resulting in accelerated cooling of the weld. Such rapid cooling rates promote the formation of hard heat affected zone microstructure making these welds susceptible to hydrogen cracking. The third concern is for the load carrying ability, such as tensile strength, fracture toughness and fatigue strength. This study was taken to investigate the effect of in-service welding conditions and assess the mechanical properties for the direct deposition welding and sleeve-repair welding of in-service gas pipelines and develope the welding procedure specification for in-service pipeline repair. 81 figs., 40 tabs.

  18. The method of predicting the process of condensation of moisture and hydrate formation in the gas pipeline

    OpenAIRE

    Хвостова, Олена Вікторівна

    2014-01-01

    The problem of ensuring the required value of one of the natural gas quality indicators during its transportation to the consumer - moisture content is considered in the paper. The method for predicting possible moisture condensation and hydrate formation processes in gas pipelines considering mixing gas flows with different moisture content was developed.Predicting the moisture condensation and hydrate formation in gas pipelines is an actual task since a timely prevention of these processes ...

  19. EU Security of Gas Supplies: Solidarity Runs Through the Pipeline

    International Nuclear Information System (INIS)

    Aoun, Marie-Claire; Rutten, Daan

    2016-05-01

    The ongoing efforts to lessen the European Union's (EU) vulnerability to gas shortages by adopting internal measures were triggered by the Ukrainian gas disputes of 2006 and 2009. The latter deprived several EU Member States of 20% of their gas supplies (30% of imports) for 14 days in the middle of winter due to tensions with Russia. This prompted Member States in 2010 to adopt a Regulation for the Security of Gas Supply, replacing the skeletal 2004 Directive. Since 2014, tensions have increased significantly between the EU and Russia, the block's main gas supplier. Although this has not led to any gas supply disruptions in Europe, and this time Ukraine has been able to revert to reverse flows, national production and storage withdrawals to replace the Russian gas flows, there remains a perceived elevated risk of gas supply disruptions to the EU, especially by certain Member States. This led the European Commission (EC) to publish its first-ever European Energy Security Strategy in May 2014, which was followed by the Gas Stress Tests of October 2014. In February 2015, the EC published its Energy Union Strategy Framework, which was strongly motivated by energy security concerns. In that context, the EC announced a series of proposals for its gas and electricity markets in 2016 and 2017, among which was the 'Sustainable Energy Security Package' (hereafter: Package). This Package, published in February 2016, consists of four proposals. Two of them have a legislative nature, namely a Regulation for Security of Gas Supply and a Decision on Intergovernmental Agreements on energy. The two non-legislative proposals are strategy papers dealing respectively with LNG and Gas Storage, and Heating and Cooling. The purpose of this paper is to focus on the proposed Regulation and to offer considerations on some of its provisions, in particular on the move from the national to the regional level of cooperation and on the legislative formalization of solidarity. (author)

  20. 78 FR 44900 - Communication of Operational Information Between Natural Gas Pipelines and Electric Transmission...

    Science.gov (United States)

    2013-07-25

    ... Regional Transmission Organizations and Independent System Operators (RTOs/ISOs) also noted that, although... operator from discussions between RTOs/ ISOs and natural gas pipelines regarding the status of a generator... not customers of electric transmission operators. Likewise, in the case of RTOs/ISOs, they are not...

  1. Component-based control of oil-gas-water mixture composition in pipelines

    Science.gov (United States)

    Voytyuk, I. N.

    2018-03-01

    The article theoretically proves the method for measuring the changes in content of oil, gas and water in pipelines; also the measurement system design for implementation thereof is discussed. An assessment is presented in connection with random and systemic errors for the future system, and recommendations for optimization thereof are presented.

  2. New method of leak detecting in diagnostic of gas pipeline system

    International Nuclear Information System (INIS)

    Kalinowski, K.; Dabrowski, A.; Sobkiewicz, D.; Oracz, H.

    2007-01-01

    This report describes new directions in gas transmission pipelines diagnostics as well as new methods and equipment used to detect leaks. It was also shown that efficient and functional diagnostics system is the necessary condition to keep the exploitation of transmission systems safe. (author)

  3. Powers of detection : technology companies vie to capture leak survey business for natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Byfield, M.

    2005-09-01

    ITT Industries Inc., Physical Sciences Inc., and LaSen Inc. are 3 American companies leading the way to find more efficient methods for identifying leaks from natural gas pipelines. Edmonton-based Synodon Inc. has recently joined the leaders with its newly developed and more sensitive equipment that it hopes to have on the market by the summer of 2006. Leak detection technology was first developed in 1993 in response to concerns about the reliability of aging pipeline infrastructure. In addition to safety concerns, there are concerns over global warming. Methane is a potential greenhouse gas and the United states Environmental Protection Agency estimates that 300 billion cubic feet escape into the atmosphere every year from pipeline leaks. The 2002 Pipeline Safety Improvement Bill in the United States stipulates that leak inspections must be conducted up to 4 times per year in densely populated areas. Violators face fines as high as $1 million. In response to the pipeline safety bill, Synodon raised private equity financing to commercialize an airborne leak detection technology stemming from Canada's space program. In the United States, leak detection technologies that appear likely to take 5 to 20 years for commercialization have been been financed by the Department of Energy and the Office of Pipeline Safety. This paper summarized 5 leak detection prototypes, including ITT's Airborne Natural Gas Emission LiDAR (ANGEL) system which targets high-pressure, long-distance pipelines in North America, LaSen's Airborne LiDAR Pipeline Inspection System (ALPIS) based on DIAL Technology, and a hand-held remote methane leak detector developed jointly by Physical Sciences Inc. of Massachusetts and Houston-based Heath Consultants Inc. Synodon claims that hand-held detectors are too slow and that LiDAR systems still aren't reliable for detection of leaks much below 500 scf/h. Synodon's realSens technology may be more difficult to develop, but it detects

  4. Integral diagnostic in the failure causes of external corrosion of a natural gas transport pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Mora-Mendoza, J.L.; Saucedo-Robles, L.C.; Rodriguez-Clemente, H. [PEMEX Gas y Petroquimica Basica, Subdireccion de Ductos; Marina Nacional 329, Edificio B-1, Piso 8, Col. Huasteca, D.F., CP 11311 (Mexico); Gonzalez-Nunez, M.A. [Instituto de Investigaciones Electricas, Reforma 113, Col. Palmira, Cuernavaca, Morelos, CP 62490 (Mexico); Zavala-Olivares, G.; Hernandez-Gayosso, M.J. [Instituto Mexicano del Petroleo, Direccion de Exploracion y Produccion, Eje Central Lazaro Cardenas Norte 152, Col. San Bartolo Atepehuacan, D.F., CP 07730 (Mexico)

    2011-08-15

    The objective of this study consisted in investigating the possible causes which give rise to the presence of low wall pipe thicknesses on a 16'' natural gas transport pipeline, even though during the last 12-year period cathodic protection (CP) potentials were kept in the protection range at which external corrosion should not occur. Results from in-line inspection from a 16'' natural gas transport pipeline showed 46 indications with more than 80% wall thickness lost due to external corrosion in the second segment of the pipeline. Direct inspection at the indication locations, review of the CP system performance, pipeline maintenance programs and studies, allowed to make an integral diagnostic where it was found out that the main cause of external corrosion was an inappropriate coating application since the pipeline construction, this situation has originated the increase of CP shielding effects through time. (Copyright copyright 2011 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  5. NATURAL GAS SUPPLY PROJECTS FOR EUROPE – SOUTH STREAM AND NABUCCO

    Directory of Open Access Journals (Sweden)

    Domagoj Sučić

    2011-12-01

    Full Text Available South Stream and Nabucco are planned southern corridor projects for natural gas supply to Europe. South Stream is a Russian construction project of the gas pipeline with the capacity of 63 bcm of natural gas per year. It will connect Russia with Austria through Black Sea, Bulgaria, Serbia and Hungary, and with southern Italy through Greece and Ionian Sea, respectively. Nabucco is a European Union planned gas pipeline with the capacity of 31 bcm per year. If built, it will connect Caspian Region and Middle East with Austria through Turkey, Bulgaria, Romania and Hungary. Gas sources for South Stream pipeline are known and available, however it’s construction will be expensive. Nabucco gas pipeline construction costs will be two times less, but the unresolved political relations and non-existent infrastructure have caused it to have no available gas sources at the moment. Countries like Bulgaria and Hungary are involved with both projects, indicating the importance of both projects. In this paper SWOT analysis of the proposed projects was done and it has shown that there is a great chance Nabucco won’t be built if South Stream materializes first (the paper is published in Croatian.

  6. Pipeline leakage recognition based on the projection singular value features and support vector machine

    Energy Technology Data Exchange (ETDEWEB)

    Liang, Wei; Zhang, Laibin; Mingda, Wang; Jinqiu, Hu [College of Mechanical and Transportation Engineering, China University of Petroleum, Beijing, (China)

    2010-07-01

    The negative wave pressure method is one of the processes used to detect leaks on oil pipelines. The development of new leakage recognition processes is difficult because it is practically impossible to collect leakage pressure samples. The method of leakage feature extraction and the selection of the recognition model are also important in pipeline leakage detection. This study investigated a new feature extraction approach Singular Value Projection (SVP). It projects the singular value to a standard basis. A new pipeline recognition model based on the multi-class Support Vector Machines was also developed. It was found that SVP is a clear and concise recognition feature of the negative pressure wave. Field experiments proved that the model provided a high recognition accuracy rate. This approach to pipeline leakage detection based on the SVP and SVM has a high application value.

  7. 76 FR 52652 - National Fuel Gas Supply Corporation; Tennessee Gas Pipeline Company; Notice of Availability of...

    Science.gov (United States)

    2011-08-23

    ... gas-fired turbines for compressor units A2 and A3 and restaging of centrifugal compressors for units... project includes the following facilities: A new East Aurora Compressor Station, totaling 4,470... Concord Compressor Station in Erie County, to permit bi-directional flow; Modifications to underground...

  8. The redefinition of the american and british gas industries: the regulation of the access load to the gas pipelines networks

    International Nuclear Information System (INIS)

    David, L.

    2000-10-01

    The transport and distribution networks regulation is the main stakes of the regulation reform of the gas industries. This thesis analyzes the models applied in The Usa and in the United Kingdom. The first part deals with the gas industries deregulation in these two countries, the impacts on the economy and the organization of the gas industries. The second part presents a theoretical approach of the regulation applied to the prices of the natural ags transport by gas pipelines. Regulation by the service cost price and by price cap are compared. (A.L.B.)

  9. Sulfate reducing bacteria detection in gas pipelines; Deteccao de bacterias redutoras de sulfato em gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Lutterbach, Marcia Teresa S.; Oliveira, Ana Lucia C. de; Cavalcanti, Eduardo H. de S. [Instituto Nacional de Tecnologia (INT), Rio de Janeiro, RJ (Brazil). Div. de Corrosao e Degradacao]. E-mails: marciasl@int.gov.br; analucia@int.gov.br; eduardoh@int.gov.br

    2004-07-01

    Microbiology induced corrosion (MIC) process associated with sulfate reducing bacteria (BRS) are one of the most important matter of concern for the oil and gas industry as 77% of failures have been attributed this sort of degradation. Corrosion products found present in gas transportation pipelines, the so-called 'black-powder' problem, are also a nuisance and source of economic losses for the gas industry. According to the literature, the incidence of black-powder can be ascribed to the metabolism of BRS that can be found in the gas environment. Integrity monitoring programs of gas pipelines adopt pigging as an important tool for internal corrosion monitoring. Solid residue such as the black-powder, collected by pigging, as well as the condensed, can be seen as a very valuable samples for microbiological analyses that can be used to detect and quantify bacteria related to the incidence of MIC processes. In the present work results concerning samples collected by pigging and condensed are presented. Small populations of viable BRS have been found in the pipeline. It can be seen that the inclusion of microbiological analyses of solid and liquid residues as a complementary action in the integrity monitoring programs adopted by gas transportation industry can be very helpful on the decision making concerning preventive and corrective actions to be taken in order to maintain the CIM processes under control. (author)

  10. Literature Review: Theory and Application of In-Line Inspection Technologies for Oil and Gas Pipeline Girth Weld Defection

    Science.gov (United States)

    Feng, Qingshan; Li, Rui; Nie, Baohua; Liu, Shucong; Zhao, Lianyu; Zhang, Hong

    2016-01-01

    Girth weld cracking is one of the main failure modes in oil and gas pipelines; girth weld cracking inspection has great economic and social significance for the intrinsic safety of pipelines. This paper introduces the typical girth weld defects of oil and gas pipelines and the common nondestructive testing methods, and systematically generalizes the progress in the studies on technical principles, signal analysis, defect sizing method and inspection reliability, etc., of magnetic flux leakage (MFL) inspection, liquid ultrasonic inspection, electromagnetic acoustic transducer (EMAT) inspection and remote field eddy current (RFDC) inspection for oil and gas pipeline girth weld defects. Additionally, it introduces the new technologies for composite ultrasonic, laser ultrasonic, and magnetostriction inspection, and provides reference for development and application of oil and gas pipeline girth weld defect in-line inspection technology. PMID:28036016

  11. Urucu-Manaus gas pipeline: challenges and solutions; Gasoduto Urucu-Manaus: desafios e solucoes

    Energy Technology Data Exchange (ETDEWEB)

    Loureiro, Mauro de O.; Machado, Otto Luiz de M.; Moura, Marcos [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The challenge of building and develop a gas pipeline such as Urucu-Manaus, in the middle of Amazon rain forest, it is beyond to conventional engineering solutions that is common used in this kind of contract. The development of this venture join a large variety of activities since the several techniques of pipeline construction to the improvement the skills of the local workers but never to leave out important points such as integrated management of work, for instance, safety, environment care, health, communication with the involved parts, archaeology, goods and services acquisition, telecommunications and the mean of transportation to equipment and workers. (author)

  12. Development of a Free-Swimming Acoustic Tool for Liquid Pipeline Leak Detection Including Evaluation for Natural Gas Pipeline Applications

    Science.gov (United States)

    2010-08-01

    Significant financial and environmental consequences often result from line leakage of oil product pipelines. Product can escape into the surrounding soil as even the smallest leak can lead to rupture of the pipeline. From a health perspective, water...

  13. Air-drying Models for New-built Offshore Gas Pipelines%新建海底天然气管道干空气干燥模型研究

    Institute of Scientific and Technical Information of China (English)

    曹学文; 王立洋; 林宗虎

    2005-01-01

    Drying (conditioning) is an important procedure to prevent hydrate formation during gas pipeline gas-up and to protect pipelines against corrosion. The air-drying method is preferred in offshore gas pipelines pre-commissioning. The air-drying process of gas pipelines commonly includes two steps, air purging and soak test. The mass conservation and the phase equilibrium theory are applied to setting up the mathematical models of air purging, which can be used to simulate dry airflow rate and drying time. Fick diffusion law is applied to setting up the mathematical model of soak test, which can predict the water vapor concentration distribution. The results calculated from the purging model and the soak test model are in good agreement with the experimental data in the DF1-1 offshore production pipeline conditioning. The models are verified to be available for the air-drying project design of offshore gas pipelines. Some proposals for air-drying engineering and operational procedures are put forward by analyzing the air-drying process of DF1-1 gas-exporting pipelines.

  14. Reasons for decision in the matter of Enbridge Pipelines Inc. Line 4 Extension Project : facilities

    International Nuclear Information System (INIS)

    2008-01-01

    In June 2007, Enbridge Pipelines Inc. applied for approval to extend Line 4 of its Mainline pipeline upstream from Hardisty to Edmonton, Alberta. The project would relieve a potential bottleneck and would also add an additional line across this segment to increase system security and flexibility. The average annual capacity of Line 4 would be 140,000 cubic metres per day. The Enbridge Mainline from Edmonton to Hardisty currently includes 3 oil pipelines, while the Enbridge Mainline downstream of Hardisty includes 4 oil pipelines. This document presented the views of the Board regarding the construction and operation of the project facilities; public and Aboriginal consultation; environmental and socio-economic matters; land matters; tolls and tariffs; and, supply, markets, financing and economics. The Board noted that the benefits of this project outweigh the burdens associated with it. The project required an environmental assessment under the Canadian Environmental Assessment Act which found that it is not likely to cause significant adverse environmental effects. In its approval of the project, the Board attached 15 conditions, including a requirement for Enbridge to file an updated Environmental Protection Plan for the Board's approval. The Board also approved Enbridge's application for its tolling method and to reactivate 3 sections of pre-existing pipeline. 3 tabs., 3 figs., 3 appendices

  15. Joining the CCS Club. Insights from a Northwest European CO2 Pipeline Project

    International Nuclear Information System (INIS)

    Massol, Olivier; Tchung-Ming, Stephane

    2012-01-01

    The large-scale diffusion of Carbon Capture and Storage (CCS) imposes the construction of a sizeable CO 2 pipeline infrastructure. This paper analyzes the conditions for a widespread adoption of CCS by a group of emitters that can be connected to a common pipeline system. It details a quantitative framework capable of assessing how the tariff structure and the regulatory constraints imposed on the pipeline operator impact the overall cost of CO 2 abatement via CCS. This modeling framework is applied to the case of a real European CO 2 pipeline project. We find that the obligation to use cross-subsidy-free pipeline tariffs has a minor impact on the minimum CO 2 price required to adopt the CCS. In contrast, the obligation to charge non-discriminatory prices can either impede the adoption of CCS or significantly raises that price. Besides, we compared two alternative regulatory frameworks for CCS pipelines: a common European organization as opposed to a collection of national regulations. The results indicate that the institutional scope of that regulation has a limited impact on the adoption of CCS compared to the detailed design of the tariff structure imposed to pipeline operators. (authors)

  16. Oil and gas pipelines with hydrophobic surfaces better equipped to deal with gas hydrate flow assurance issues

    DEFF Research Database (Denmark)

    Perfeldt, Christine Malmos; Sharifi, Hassan; von Solms, Nicolas

    2015-01-01

    Gas hydrate deposition can cause plugging in oil and gas pipelines with resultant flow assurance challenges. Presently, the energy industry uses chemical additives in order to manage hydrate formation, however these chemicals are expensive and may be associated with safety and environmental...... concerns. Here we show the effect of a hydrophobically coated surface on hydrate formation in the presence of an antifreeze protein type I (AFP I) and a biodegradable synthetic polymer (LuvicapBio) in a high pressure crystallizer setup. The hydrophobic surface increased the hydrate induction time...... crystallizer. This indicates that 10 to 14 times less KHI is needed in the presence of a hydrophobically coated surface. These experimental studies suggest that the use of hydrophobic surfaces or pipelines could serve as an alternative or additional flow assurance approach for gas hydration mitigation...

  17. Evaluation of the sources of error in the linepack estimation of a natural gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Marco, Fabio Capelassi Gavazzi de [Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (TBG), Rio de Janeiro, RJ (Brazil)

    2012-07-01

    The intent of this work is to explore the behavior of the random error associated with determination of linepack in a complex natural gas pipeline based on the effect introduced by the uncertainty of the different variables involved. There are many parameters involved in the determination of the gas inventory in a transmission pipeline: geometrical (diameter, length and elevation profile), operational (pressure, temperature and gas composition), environmental (ambient / ground temperature) and those dependent on the modeling assumptions (compressibility factor and heat transfer coefficient). Due to the extent of a natural gas pipeline and the vast amount of sensor involved it is infeasible to determine analytically the magnitude of resulting uncertainty in the linepack, thus this problem has been addressed using Monte Carlo Method. The approach consists of introducing random errors in the values of pressure, temperature and gas gravity that are employed in the determination of the linepack and verify its impact. Additionally, the errors associated with three different modeling assumptions to estimate the linepack are explored. The results reveal that pressure is the most critical variable while the temperature is the less critical. In regard to the different methods to estimate the linepack, deviations around 1.6% were verified among the methods. (author)

  18. Operational Challenges in Gas-To-Liquid (GTL) Transportation Through Trans Alaska Pipeline System (TAPS)

    Energy Technology Data Exchange (ETDEWEB)

    Godwin A. Chukwu; Santanu Khataniar; Shirish Patil; Abhijit Dandekar

    2006-06-30

    Oil production from Alaskan North Slope oil fields has steadily declined. In the near future, ANS crude oil production will decline to such a level (200,000 to 400,000 bbl/day) that maintaining economic operation of the Trans-Alaska Pipeline System (TAPS) will require pumping alternative products through the system. Heavy oil deposits in the West Sak and Ugnu formations are a potential resource, although transporting these products involves addressing important sedimentation issues. One possibility is the use of Gas-to-Liquid (GTL) technology. Estimated recoverable gas reserves of 38 trillion cubic feet (TCF) on the North Slope of Alaska can be converted to liquid with GTL technology and combined with the heavy oils for a product suitable for pipeline transport. Issues that could affect transport of this such products through TAPS include pumpability of GTL and crude oil blends, cold restart of the pipeline following a prolonged winter shutdown, and solids deposition inside the pipeline. This study examined several key fluid properties of GTL, crude oil and four selected blends under TAPS operating conditions. Key measurements included Reid Vapor Pressure, density and viscosity, PVT properties, and solids deposition. Results showed that gel strength is not a significant factor for the ratios of GTL-crude oil blend mixtures (1:1; 1:2; 1:3; 1:4) tested under TAPS cold re-start conditions at temperatures above - 20 F, although Bingham fluid flow characteristics exhibited by the blends at low temperatures indicate high pumping power requirements following prolonged shutdown. Solids deposition is a major concern for all studied blends. For the commingled flow profile studied, decreased throughput can result in increased and more rapid solid deposition along the pipe wall, resulting in more frequent pigging of the pipeline or, if left unchecked, pipeline corrosion.

  19. Northern pipelines : backgrounder

    International Nuclear Information System (INIS)

    2002-04-01

    Most analysts agree that demand for natural gas in North America will continue to grow. Favourable market conditions created by rising demand and declining production have sparked renewed interest in northern natural gas development. The 2002 Annual Energy Outlook forecasted U.S. consumption to increase at an annual average rate of 2 per cent from 22.8 trillion cubic feet to 33.8 TCF by 2020, mostly due to rapid growth in demand for electric power generation. Natural gas prices are also expected to increase at an annual average rate of 1.6 per cent, reaching $3.26 per thousand cubic feet in 2020. There are currently 3 proposals for pipelines to move northern gas to US markets. They include a stand-alone Mackenzie Delta Project, the Alaska Highway Pipeline Project, and an offshore route that would combine Alaskan and Canadian gas in a pipeline across the floor of the Beaufort Sea. Current market conditions and demand suggest that the projects are not mutually exclusive, but complimentary. The factors that differentiate northern pipeline proposals are reserves, preparedness for market, costs, engineering, and environmental differences. Canada has affirmed its role to provide the regulatory and fiscal certainty needed by industry to make investment decisions. The Government of the Yukon does not believe that the Alaska Highway Project will shut in Mackenzie Delta gas, but will instead pave the way for development of a new northern natural gas industry. The Alaska Highway Pipeline Project will bring significant benefits for the Yukon, the Northwest Territories and the rest of Canada. Unresolved land claims are one of the challenges that has to be addressed for both Yukon and the Northwest Territories, as the proposed Alaska Highway Pipeline will travel through traditional territories of several Yukon first Nations. 1 tab., 4 figs

  20. 76 FR 73618 - Tennessee Gas Pipeline Company; Notice of Availability of the Environmental Assessment for the...

    Science.gov (United States)

    2011-11-29

    ... assesses the potential environmental effects of the construction and operation of the Project in accordance...; and Sussex County, New Jersey; Abandonment of an existing meter station and construction of a new... that can be used to clean and dry a pipeline and/or to inspect it for damage or corrosion. Use of...

  1. Status of mapping for pre-detailing and projects of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gil, Fabio Vinicius Fontoura; Paoletto, Bonatto Silvia M. [ESTEIO Engenharia e Aerolevantamentos S.A, Curitiba, PR (Brazil)

    2009-07-01

    Considering the ever growing need for widening and supplying of the national energy matrix, ESTEIO Engenharia e Aerolevantamentos SA presents its participation in the Pipeline area, through Cartography activities, pointing out the performance on strips yet to be implanted, with activities as aerial survey, laser surveys, creation of orthophotomap, tracing definition, rivers crossing, geotechnical surveys, cadaster, creation of cadaster maps, strips, basic project drawings, imagery maps, as well as activities for existing strips, such as: aerial survey, laser surveys, strips enlargements, new property surveys, detection of pipelines through PCM technology, planimetric survey of equipment, besides activities for Pipeline Strips Geometry - FEED - pointing out the detailing of the areas which will be used for the dumping of the digging material and definition of accesses to the pipeline strips. We shall also present the technological evolution and consequent product improvements, considering surveys performed with conventional and digital aerial survey cameras, besides laser data. (author)

  2. A Reliability Assessment of the Hydrostatic Test of Pipeline with 0.8 Design Factor in the West–East China Natural Gas Pipeline III

    Directory of Open Access Journals (Sweden)

    Kai Wen

    2018-05-01

    Full Text Available The use of 0.8 design factor in Chinese pipeline industry is a breakthrough with the success of the test pipe section in the west–east China gas pipeline III. For such a design factor, the traditional P-V (Pressure-Volume curve based pressure test control cannot describe the details of the process, and the 0/1 type failure is not an efficient index to show the safety level of the pipeline. In this paper, a reliability based assessment method is proposed to monitor the real-time failure probability of the pipeline during the hydrostatic test process. The reliability index can be used as the degree of risk. Following the actual hydrostatic testing of a test pipe section with 0.8 design factor in the west–east China gas pipeline III, reliability analysis was performed using Monte Carlo technique. The basic values of input parameters of the limit state equations are based on the data collected from either the tested section or the recommended value in the codes. The analysis of limit states, i.e., the yielding deformation and the excessive plastic deformation of pipeline, proceeded based on these distributions. Finally, it is found that the gradually increased water pressure makes the failure probability increase accordingly. A reliability assessment method was proposed and illustrated with the practical pressure test process.

  3. Natural gas and CO2 price variation: impact on the relative cost-efficiency of LNG and pipelines.

    Science.gov (United States)

    Ulvestad, Marte; Overland, Indra

    2012-06-01

    THIS ARTICLE DEVELOPS A FORMAL MODEL FOR COMPARING THE COST STRUCTURE OF THE TWO MAIN TRANSPORT OPTIONS FOR NATURAL GAS: liquefied natural gas (LNG) and pipelines. In particular, it evaluates how variations in the prices of natural gas and greenhouse gas emissions affect the relative cost-efficiency of these two options. Natural gas is often promoted as the most environmentally friendly of all fossil fuels, and LNG as a modern and efficient way of transporting it. Some research has been carried out into the local environmental impact of LNG facilities, but almost none into aspects related to climate change. This paper concludes that at current price levels for natural gas and CO 2 emissions the distance from field to consumer and the volume of natural gas transported are the main determinants of transport costs. The pricing of natural gas and greenhouse emissions influence the relative cost-efficiency of LNG and pipeline transport, but only to a limited degree at current price levels. Because more energy is required for the LNG process (especially for fuelling the liquefaction process) than for pipelines at distances below 9100 km, LNG is more exposed to variability in the price of natural gas and greenhouse gas emissions up to this distance. If the prices of natural gas and/or greenhouse gas emission rise dramatically in the future, this will affect the choice between pipelines and LNG. Such a price increase will be favourable for pipelines relative to LNG.

  4. 18 CFR 260.9 - Reports by natural gas pipeline companies on service interruptions and damage to facilities.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Reports by natural gas..., NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.9 Reports by natural gas pipeline companies on service interruptions and damage to facilities. (a)(1) Every natural gas company must report to the...

  5. Bolivia-Brazil gas-pipeline implantation. The employment generation according to Leontief's matrix

    International Nuclear Information System (INIS)

    Pieroni, Fernando de Paiva; Guerra, Sinclair Mallet Guy

    1999-01-01

    During the past 15 years, a strong evolution in the concept of the use of energy for industrial purpose was brought in step by step by the Governments and users themselves. The progress within the fields of energy savings, thermal control and reduction of air pollution must be pointed out. Within this scheme the natural gas technology has overcome many technical difficulties and the solutions using natural gas rank among the most efficient to tackle current problems. The aim of this work is to analyse Bolivia-Brazil gas-pipeline implantation and it influences in the Brazilian economy

  6. [Gas pipeline leak detection based on tunable diode laser absorption spectroscopy].

    Science.gov (United States)

    Zhang, Qi-Xing; Wang, Jin-Jun; Liu, Bing-Hai; Cai, Ting-Li; Qiao, Li-Feng; Zhang, Yong-Ming

    2009-08-01

    The principle of tunable diode laser absorption spectroscopy and harmonic detection technique was introduced. An experimental device was developed by point sampling through small multi-reflection gas cell. A specific line near 1 653. 7 nm was targeted for methane measurement using a distributed feedback diode laser as tunable light source. The linearity between the intensity of second harmonic signal and the concentration of methane was determined. The background content of methane in air was measured. The results show that gas sensors using tunable diode lasers provide a high sensitivity and high selectivity method for city gas pipeline leak detection.

  7. Correlation between designed wall thickness of gas pipelines and external and internal corrosion processes; Adequacao de espessura de parede projetada em funcao de processos de corrosao externa e interna em gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Gomes, Jose Antonio da Cunha Ponciano [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-Graduacao de Engenharia (COPPE). Programa de Engenharia Metalurgica

    2004-07-01

    Corrosion control on gas pipelines plays an important role on the assessment of pipeline integrity and reliability. In many countries a great extension of buried pipelines is used on transport and distribution systems. This extension will be certainly increased in a near future due to the increasing consumption of natural gas. Inadequate corrosion control can drive to pipeline failures, bringing up the possibility of accidents in populated or environmental protected areas, bringing together severe economical, legal and environmental consequences. Corrosion is frequently considered as a natural and inevitable phenomenon. Based upon this assumption, some recommendations are included on design standards of gas pipelines in order to compensate its detrimental effect. The aim of this work is to present a review of the correlation between external corrosion process and the guidelines established during the project phase of gas pipelines. It is intended to contribute for a better understanding of the impacts of corrosion on integrity, reliability and readiness of gas transport and distribution systems. Some aspects regarding external corrosion of pipelines extracted from technical papers will be summarised. Information provided will be compared to design criterion prescribed by the NBR 12712 Standard. (author)

  8. Designing a reliable leak bio-detection system for natural gas pipelines

    International Nuclear Information System (INIS)

    Batzias, F.A.; Siontorou, C.G.; Spanidis, P.-M.P.

    2011-01-01

    Monitoring of natural gas (NG) pipelines is an important task for economical/safety operation, loss prevention and environmental protection. Timely and reliable leak detection of gas pipeline, therefore, plays a key role in the overall integrity management for the pipeline system. Owing to the various limitations of the currently available techniques and the surveillance area that needs to be covered, the research on new detector systems is still thriving. Biosensors are worldwide considered as a niche technology in the environmental market, since they afford the desired detector capabilities at low cost, provided they have been properly designed/developed and rationally placed/networked/maintained by the aid of operational research techniques. This paper addresses NG leakage surveillance through a robust cooperative/synergistic scheme between biosensors and conventional detector systems; the network is validated in situ and optimized in order to provide reliable information at the required granularity level. The proposed scheme is substantiated through a knowledge based approach and relies on Fuzzy Multicriteria Analysis (FMCA), for selecting the best biosensor design that suits both, the target analyte and the operational micro-environment. This approach is illustrated in the design of leak surveying over a pipeline network in Greece.

  9. Multi-attribute risk assessment for risk ranking of natural gas pipelines

    International Nuclear Information System (INIS)

    Brito, A.J.; Almeida, A.T. de

    2009-01-01

    The paper presents a decision model for risk assessment and for risk ranking of sections of natural gas pipelines based on multi-attribute utility theory. Pipeline hazard scenarios are surveyed and the reasons for a risk assessment model based on a multi-attribute approach are presented. Three dimensions of impact and the need to translate decision-makers' preferences into risk management decisions are highlighted. The model approaches these factors by using a multi-attribute utility function, in order to produce multi-dimensional risk measurements. By using decision analysis concepts, this model quantitatively incorporates the decision-maker's preferences and behavior regarding risk within clear and consistent risk measurements. In order to support the prioritizing of critical sections of pipeline in natural gas companies, this multi-attribute model also allows sections of pipeline to be ranked into a risk hierarchy. A numerical application based on a real case study was undertaken so that the effectiveness of the decision model could be verified

  10. Evaluation of revegetation progress and erosion-prone areas along oil and gas pipelines in Azerbaijan

    Energy Technology Data Exchange (ETDEWEB)

    Bayramov, Emil [BP British Petroleum, Baku (Azerbaijan)

    2012-09-15

    The construction of the Baku-Tbilisi-Ceyhan (BTC) oil and South Caucasus gas (SCP) pipelines was completed in 2005 and 2006, respectively. The Azerbaijan section of the BTC oil and SCP gas pipelines is 442 km long and lies in a 44 m wide corridor named as the Right-of-Way (RoW). BTC and SCP pipelines are aligned parallel to each other within the RoW. The construction process significantly disturbed vegetation and soil cover along the RoW of the pipelines. The revegetation and erosion control measures were conducted after the completion of construction to restore disturbed footprints of construction. The general goals of the present studies, dedicated to the environmental monitoring and erosion control measures were to evaluate the status of the revegetation in 2007 since the completion of the construction activities and to determine erosion-prone areas along the RoW. Quantitative assessment of vegetation cover (VC) was based on the regression and RMSE analysis using IKONOS NDVI 2007 and in-situ estimation of VC percentage for the normalization of NDVI to VC. The prediction of erosion-prone areas was based on the Universal Soil Loss Equation (USLE). The prediction reliability of USLE was evaluated using in-situ collected erosion occurrences. (orig.)

  11. Designing a reliable leak bio-detection system for natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Batzias, F.A., E-mail: fbatzi@unipi.gr [Univ. Piraeus, Dept. Industrial Management and Technology, Karaoli and Dimitriou 80, 18534 Piraeus (Greece); Siontorou, C.G., E-mail: csiontor@unipi.gr [Univ. Piraeus, Dept. Industrial Management and Technology, Karaoli and Dimitriou 80, 18534 Piraeus (Greece); Spanidis, P.-M.P., E-mail: pspani@asprofos.gr [Asprofos Engineering S.A, El. Venizelos 284, 17675 Kallithea (Greece)

    2011-02-15

    Monitoring of natural gas (NG) pipelines is an important task for economical/safety operation, loss prevention and environmental protection. Timely and reliable leak detection of gas pipeline, therefore, plays a key role in the overall integrity management for the pipeline system. Owing to the various limitations of the currently available techniques and the surveillance area that needs to be covered, the research on new detector systems is still thriving. Biosensors are worldwide considered as a niche technology in the environmental market, since they afford the desired detector capabilities at low cost, provided they have been properly designed/developed and rationally placed/networked/maintained by the aid of operational research techniques. This paper addresses NG leakage surveillance through a robust cooperative/synergistic scheme between biosensors and conventional detector systems; the network is validated in situ and optimized in order to provide reliable information at the required granularity level. The proposed scheme is substantiated through a knowledge based approach and relies on Fuzzy Multicriteria Analysis (FMCA), for selecting the best biosensor design that suits both, the target analyte and the operational micro-environment. This approach is illustrated in the design of leak surveying over a pipeline network in Greece.

  12. Leak detection in gas pipeline by acoustic and signal processing - A review

    Science.gov (United States)

    Adnan, N. F.; Ghazali, M. F.; Amin, M. M.; Hamat, A. M. A.

    2015-12-01

    The pipeline system is the most important part in media transport in order to deliver fluid to another station. The weak maintenance and poor safety will contribute to financial losses in term of fluid waste and environmental impacts. There are many classifications of techniques to make it easier to show their specific method and application. This paper's discussion about gas leak detection in pipeline system using acoustic method will be presented in this paper. The wave propagation in the pipeline is a key parameter in acoustic method when the leak occurs and the pressure balance of the pipe will generated by the friction between wall in the pipe. The signal processing is used to decompose the raw signal and show in time- frequency. Findings based on the acoustic method can be used for comparative study in the future. Acoustic signal and HHT is the best method to detect leak in gas pipelines. More experiments and simulation need to be carried out to get the fast result of leaking and estimation of their location.

  13. Designing a reliable leak bio-detection system for natural gas pipelines.

    Science.gov (United States)

    Batzias, F A; Siontorou, C G; Spanidis, P-M P

    2011-02-15

    Monitoring of natural gas (NG) pipelines is an important task for economical/safety operation, loss prevention and environmental protection. Timely and reliable leak detection of gas pipeline, therefore, plays a key role in the overall integrity management for the pipeline system. Owing to the various limitations of the currently available techniques and the surveillance area that needs to be covered, the research on new detector systems is still thriving. Biosensors are worldwide considered as a niche technology in the environmental market, since they afford the desired detector capabilities at low cost, provided they have been properly designed/developed and rationally placed/networked/maintained by the aid of operational research techniques. This paper addresses NG leakage surveillance through a robust cooperative/synergistic scheme between biosensors and conventional detector systems; the network is validated in situ and optimized in order to provide reliable information at the required granularity level. The proposed scheme is substantiated through a knowledge based approach and relies on Fuzzy Multicriteria Analysis (FMCA), for selecting the best biosensor design that suits both, the target analyte and the operational micro-environment. This approach is illustrated in the design of leak surveying over a pipeline network in Greece. Copyright © 2010 Elsevier B.V. All rights reserved.

  14. Suitability of pipeline material for buried gas and water piping

    Energy Technology Data Exchange (ETDEWEB)

    Funk, R

    1976-01-01

    Following a brief review of the development of the individual pipe materials and their use in the field of gas and water supply, the various stressing possibilities are dealt with. The corrosion influences from inside and outside, the material specifically for internal and external insulation, as well as the stressing due to sediments, are particularly brought out in this connection. A few remarks on the pressure pipes made of ductile cast iron, steel, reinforced concrete, asbestos cement and plastics are followed by comparisons with representations on material parameters to be proved, safety factors, tensile and pressure resistance, breaking tension and stress-strain diagram, wall thicknesses, friction losses, reactions depending on the E. modulus and distribution of the single pipe materials in the gas and water supply.

  15. Russian energy imperialism: the world mapped along the gas pipelines

    OpenAIRE

    Baločkaitė, Rasa

    2012-01-01

    Energy imperialism refers to the use of natural resources for political purposes, i.e. weaponization of energy. At the state level, it means specific institutional structure, as the state building is predetermined by oil led developments. At the international level, it means international nets of energy dependency, centered around the mother state possessing oil, gas and other natural resources. In a paradox way, the so called Western world (Western Europe and North America) becomes increasin...

  16. Friction factor in smooth and rough gas pipelines. An experimental study

    Energy Technology Data Exchange (ETDEWEB)

    Sletfjerding, Elling

    1999-01-01

    Flow of high pressure natural gas in pipelines has been studied experimentally. Pipeline flow of natural gas is characterized by high Reynolds numbers due to the low viscosity and relatively high density of pressurized gas. Friction factor correlations for high Reynolds number flow in smooth and rough pipes were developed. To study the effect of wall roughness on pipe flow at high Reynolds numbers 8 test pipes with different wall roughness were fabricated. The wall roughness in 6 of the test pipes was varied by adding glass beads in an epoxy coating applied on the pipe wall. One test pipe was treated with a smooth epoxy coating and one was left untreated. The inner diameter of the test pipes was 150 mm. Measurements of the pressure drop in the pipes were made in a closed flow loop at line pressures of 25, 70, 95 and 120 bar. The Reynolds number of the flow was varied in the range 2-30 million. The wall roughness of the test pipes was measured with a stylus instrument. Correlations between the directly measured wall roughness and the friction factor at fully rough flow conditions were presented. To characterize the wall roughness of the test pipes a parameter combining a measure of the roughness height (R{sub q}) and the texture of the wall roughness was used. Due to the high Reynolds number of the flow, minute irregularities of the pipe wall had significant effect on the friction factor in the pipe. The measured wall roughness of the test pipes was in the range 1.4 < R{sub q} <31 (my)m. The flow experiments in test pipes was compared with data from operating pipelines in the North Sea. The offshore pipelines are coated with the same epoxy coating as used in the test pipes. The friction factor in coated offshore gas pipelines showed smooth behavior when the additional pressure drop due to welds were accounted for. The study of coated gas pipelines showed that the friction factor was significantly lower than predicted by standard correlations.

  17. Jockeying for position : how the proposed pipeline projects and route-on-route competition are shaping up in the Arctic

    International Nuclear Information System (INIS)

    Andre, H.

    2003-01-01

    This presentation included a brief historical look at pipeline proposals submitted over the years to bring Alaska and Northwest Territories gas to market. The challenges facing the early proponents of a pipeline from Prudhoe Bay to the Mackenzie Delta, such as cost, environmental impact and socio-economic impact on Aboriginals living in the Mackenzie Valley, have now been removed. Lobbying efforts by politicians in Alaska nearly succeeded in forcing an Alaska Highway gas pipeline, instead of letting market economics dictate the route. The author indicated that an Alaska pipeline would not benefit the Canadian natural gas industry, rather it would force production from the Western Canada Sedimentary Basin (WCSB) to be slashed, resulting in reduced drilling and lower royalties to government. The author suggested that Canada should not grant any permit to construct a pipeline in Canada that is destined for markets in the contiguous United States if the pipeline was in any way subsidized to disadvantage Canadian producers. The author explained why the proposal to build a standalone pipeline in the Mackenzie Valley before the Alaska Highway pipeline is not a good idea. Gas prices and pipeline tolls are the most important economic elements. The author expressed the opinion that the over the top route combined with the Mackenzie Valley route would be beneficial to both Canada and the United States for a host of reasons. figs

  18. Dynamic behaviour of high-pressure natural-gas flow in pipelines

    International Nuclear Information System (INIS)

    Gato, L.M.C.; Henriques, J.C.C.

    2005-01-01

    The aim of the present study is the numerical modelling of the dynamic behaviour of high-pressure natural-gas flow in pipelines. The numerical simulation was performed by solving the conservation equations, for one-dimensional compressible flow, using the Runge-Kutta discontinuous Galerkin method, with third-order approximation in space and time. The boundary conditions were imposed using a new weak formulation based on the characteristic variables. The occurrence of pressure oscillations in natural-gas pipelines was studied as a result of the compression wave originated by the rapid closure of downstream shut-off valves. The effect of the partial reflection of pressure waves was also analyzed in the transition between pipes of different cross-sectional areas

  19. Dynamic behaviour of high-pressure natural-gas flow in pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gato, L.M.C. [Department of Mechanical Engineering, Instituto Superior Tecnico, Technical University of Lisbon, Av. Rovisco Pais, 1049-001 Lisbon (Portugal)]. E-mail: lgato@mail.ist.utl.pt; Henriques, J.C.C. [Department of Mechanical Engineering, Instituto Superior Tecnico, Technical University of Lisbon, Av. Rovisco Pais, 1049-001 Lisbon (Portugal)]. E-mail: jcch@mail.ist.utl.pt

    2005-10-01

    The aim of the present study is the numerical modelling of the dynamic behaviour of high-pressure natural-gas flow in pipelines. The numerical simulation was performed by solving the conservation equations, for one-dimensional compressible flow, using the Runge-Kutta discontinuous Galerkin method, with third-order approximation in space and time. The boundary conditions were imposed using a new weak formulation based on the characteristic variables. The occurrence of pressure oscillations in natural-gas pipelines was studied as a result of the compression wave originated by the rapid closure of downstream shut-off valves. The effect of the partial reflection of pressure waves was also analyzed in the transition between pipes of different cross-sectional areas.

  20. Influence of in-service degradation on strain localization in steel of main gas pipelines

    OpenAIRE

    Maruschak, Pavlo; Bishchak, Roman; Panin, Sergey Viktorovich; Pylypenko, Andriy; Menou, Abdellah; Danyliuk, Iryna

    2014-01-01

    General regularities in the failure kinetics of steel of main gas pipelines (17GS) are established using the method of complete stress-strain curves, meanwhile in-service degradation of metals is taken into account. The influence of material degradation on material properties under static tensioning is considered using two independent approaches: the phenomenological model of damage accumulation in metals, and the fractographic analysis method. The accumulation of in-service damage is found t...

  1. 75 FR 13342 - Pipeline Safety: Workshop on Distribution Pipeline Construction

    Science.gov (United States)

    2010-03-19

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... natural gas distribution construction. Natural gas distribution pipelines are subject to a unique subset... distribution pipeline construction practices. This workshop will focus solely on natural gas distribution...

  2. Failure analysis of natural gas buried X65 steel pipeline under deflection load using finite element method

    International Nuclear Information System (INIS)

    Liu, P.F.; Zheng, J.Y.; Zhang, B.J.; Shi, P.

    2010-01-01

    A 3D parametric finite element model of the pipeline and soil is established using finite element method to perform the failure analysis of natural gas buried X65 steel pipeline under deflection load. The pipeline is assumed to be loaded in a parabolic deflection displacement along the axial direction. Based on the true stress-strain constitutive relationship of X65 steel, the elastic-plastic finite element analysis employs the arc-length algorithm and non-linear stabilization algorithm respectively to simulate the strain softening properties of pipeline after plastic collapse. Besides, effects of the soil types and model sizes on the maximum deflection displacement of pipeline are investigated. The proposed finite element method serves as a base available for the safety design and evaluation as well as engineering acceptance criterion for the failure of pipeline due to deflection.

  3. Chechnya: the pipeline front

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1999-11-01

    This article examines the impact of the Russian campaign against Chechnya on projects for oil and gas pipelines from the new Caspian republics, which are seeking financial support. Topics discussed include the pipeline transport of oil from Azerbaijan through Chechnya to the Black Sea, the use of oil money to finance the war, the push for non-Russian export routes, the financing of pipelines, the impact of the war on the supply of Russian and Turkmenistan gas to Turkey, the proposed construction of the Trans Caspian pipeline, the weakening of trust between Russia and its neighbours, and the potential for trans Caucasus republics to look to western backers due to the instability of the North Caucasus. (UK)

  4. Behavior and dynamics of bubble breakup in gas pipeline leaks and accidental subsea oil well blowouts.

    Science.gov (United States)

    Wang, Binbin; Socolofsky, Scott A; Lai, Chris C K; Adams, E Eric; Boufadel, Michel C

    2018-06-01

    Subsea oil well blowouts and pipeline leaks release oil and gas to the environment through vigorous jets. Predicting the breakup of the released fluids in oil droplets and gas bubbles is critical to predict the fate of petroleum compounds in the marine water column. To predict the gas bubble size in oil well blowouts and pipeline leaks, we observed and quantified the flow behavior and breakup process of gas for a wide range of orifice diameters and flow rates. Flow behavior at the orifice transitions from pulsing flow to continuous discharge as the jet crosses the sonic point. Breakup dynamics transition from laminar to turbulent at a critical value of the Weber number. Very strong pure gas jets and most gas/liquid co-flowing jets exhibit atomization breakup. Bubble sizes in the atomization regime scale with the jet-to-plume transition length scale and follow -3/5 power-law scaling for a mixture Weber number. Copyright © 2018 Elsevier Ltd. All rights reserved.

  5. Guidelines for Constructing Natural Gas and Liquid Hydrocarbon Pipelines Through Areas Prone to Landslide and Subsidence Hazards

    Science.gov (United States)

    2009-01-01

    These guidelines provide recommendations for the assessment of new and existing natural gas and liquid hydrocarbon pipelines subjected to potential ground displacements resulting from landslides and subsidence. The process of defining landslide and s...

  6. A Robust Bayesian Approach to an Optimal Replacement Policy for Gas Pipelines

    Directory of Open Access Journals (Sweden)

    José Pablo Arias-Nicolás

    2015-06-01

    Full Text Available In the paper, we address Bayesian sensitivity issues when integrating experts’ judgments with available historical data in a case study about strategies for the preventive maintenance of low-pressure cast iron pipelines in an urban gas distribution network. We are interested in replacement priorities, as determined by the failure rates of pipelines deployed under different conditions. We relax the assumptions, made in previous papers, about the prior distributions on the failure rates and study changes in replacement priorities under different choices of generalized moment-constrained classes of priors. We focus on the set of non-dominated actions, and among them, we propose the least sensitive action as the optimal choice to rank different classes of pipelines, providing a sound approach to the sensitivity problem. Moreover, we are also interested in determining which classes have a failure rate exceeding a given acceptable value, considered as the threshold determining no need for replacement. Graphical tools are introduced to help decisionmakers to determine if pipelines are to be replaced and the corresponding priorities.

  7. An emerging methodology of slope hazard assessment for natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Z.J.; O' Neil, G.; Rizkalla, M. [TransCanada PipeLines Ltd., Calgary, AB (Canada)

    2000-07-01

    A new slope assessment methodology has been developed by TransCanada PipeLines Ltd. in an effort to switch from a reactive to a proactive hazard management approach and to optimize maintenance expenditure. The company operates 37,000 km of natural gas gathering and transmission pipelines, portions of which traverse slopes and stream crossings. The newly developed rainfall-ground movement model provides site-specific ground movement predictions for approximately 1100 slopes and establishes a risk-ranked list of slopes upon which maintenance decisions can be based. The input to the predictive model is derived from internal and public information regarding site conditions. This information serves as input to a pipe-soil interaction model to determine the probability of pipeline failure for each slope. The ground movement for this model is limited to creep-type which is typically less than 100 mm per year. Landslides are not addressed in this paper. A system-wide database has been constructed for slopes to prioritize the slope movement hazards. The slope information includes geotechnical data such as bedrock geology, surficial geology, slope details, precipitation and erosion potential. Information related to the pipeline includes the location, age, size, as well as design pressure and temperature. 13 refs., 2 figs.

  8. Conditions of the optimum development of a high-pressure natural gas pipeline system regarding up-to-date gas economy. [Hungary

    Energy Technology Data Exchange (ETDEWEB)

    Csako, D.; Torok, A.; Vasvari, V.

    1980-03-01

    Hungarian engineers enumerate the factors to consider in the planning, construction, and expansion of gas pipeline systems to obtain an optimum solution, both technically and economically. Future development of pipeline systems in Hungary will place equal emphasis on system quality and network expansion.

  9. Shell's Caroline gas project on track in southwest Alberta

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that western Canada's biggest sour natural gas, sulfur, and natural gas liquids development project in 2 decades is on target to start up late this year. Shell Canada Ltd.'s $950 million (Canadian) Caroline project will produce 2 tcf of gas and associated products from the Swan Hills member of the middle Devonian Beaverhill Lake group. The price tag will reach about $1 billion, including some start-up costs. The project is designed to process an average 300 MMcfd of gas. It will produce 17,500 b/d of pentanes plus, 4,100 metric tons/day of sulfur, 90 MMcfd of sales gas, and 28,000 b/d of NGL-ethane, propane, and butane. A labor force that is peaking at about 2,400 workers is completing a network of processing plants, about 143 miles of pipeline, three field compressors, and other facilities covering an area of 161 sq miles. Dilcon Constructors Ltd., an arm of Delta Catalytic Corp., Calgary, is the main contractor for the project. About 85% of the services and equipment for Caroline are coming from Alberta suppliers, 7% from suppliers elsewhere in Canada, and only 8% from non-Canadian Sources

  10. Natural Gas and CO2 Price Variation: Impact on the Relative Cost-Efficiency of LNG and Pipelines

    OpenAIRE

    Øverland, Indra; Ulvestad, Marte

    2012-01-01

    This article develops a formal model for comparing the cost structure of the two main transport options for natural gas: liquefied natural gas (LNG) and pipelines. In particular, it evaluates how variations in the prices of natural gas and greenhouse gas emissions affect the relative cost-efficiency of these two options. Natural gas is often promoted as the most environmentally friendly of all fossil fuels, and LNG as a modern and efficient way of transporting it. Some research has been carri...

  11. Methane emissions from natural gas pipelines - current estimates, technologies and practices

    International Nuclear Information System (INIS)

    Lang, M.C.; Crook, L.

    1997-01-01

    Methane is the major component of natural gas. World-wide methane emissions from gas systems is estimated to be between 50 and 25 tera grams or about 5 percent of the world-wide total of anthropogenic methane emissions. Technologies and practices are described that are currently being used or are planned to be used in the US to both measure and/or reduce methane emissions from natural gas pipelines. One of the technologies that is described includes a high flow sampling instrument. One of the practices that is described is the current voluntary program conducted by the US Environmental Protection Agency called the Natural Gas Star program. This program supports research into best management practices, information sharing and technology transfer to promote methane emissions reductions profitably. (R.P.)

  12. U.S., Canadian pipelines producers lining up to meet Mexican gas demand growth

    International Nuclear Information System (INIS)

    Koen, A.D.

    1992-01-01

    This paper reports on prospects for continued strong growth in Mexican demand for natural gas imports that have U.S. and Canadian producers and pipelines queueing up to serve expected demand. In 1991, more than 25 U.S. companies exported a combined 61.7 bcf of gas into Mexico, an increase of more than 390% from 1990's total of 15.7 bcf. According to the Department of Energy Office of Fuels Programs (OFP), about 27.5 bcf of gas left the U.S. for Mexico in fourth quarter 1991 alone, an average 299 MMcfd. DOE has granted short term authorization to more than 65 countries to export gas into Mexico. Another 25 companies have short term export applications pending

  13. Northern pipelines : challenges and needs

    Energy Technology Data Exchange (ETDEWEB)

    Dean, D.; Brownie, D. [ProLog Canada Inc., Calgary, AB (Canada); Fafara, R. [TransCanada PipeLines Ltd., Calgary, AB (Canada)

    2007-07-01

    Working Group 10 presented experiences acquired from the operation of pipeline systems in a northern environment. There are currently 3 pipelines operating north of 60, notably the Shiha gas pipeline near Fort Liard, the Ikhil gas pipeline in Inuvik and the Norman Wells oil pipeline. Each has its unique commissioning, operating and maintenance challenges, as well as specific training and logistical support requirements for the use of in-line inspection tools and other forms of integrity assessment. The effectiveness of cathodic protection systems in a permafrost northern environment was also discussed. It was noted that the delay of the Mackenzie Gas Pipeline Project by two to three years due to joint regulatory review may lead to resource constraints for the project as well as competition for already scarce human resources. The issue of a potential timing conflict with the Alaskan Pipeline Project was also addressed as well as land use issues for routing of supply roads. Integrity monitoring and assessment issues were outlined with reference to pipe soil interaction monitoring in discontinuous permafrost; south facing denuded slope stability; base lining projects; and reclamation issues. It was noted that automatic welding and inspection will increase productivity, while reducing the need for manual labour. In response to anticipated training needs, companies are planning to involve and train Aboriginal labour and will provide camp living conditions that will attract labour. tabs., figs.

  14. 210Pb content in natural gas pipeline residues ('black-powder') and its correlation with the chemical composition

    International Nuclear Information System (INIS)

    Godoy, Jose Marcus; Carvalho, Franciane; Cordilha, Aloisio; Matta, Luiz Ernesto; Godoy, Maria Luiza

    2005-01-01

    The present work was carried out to assess the 210 Pb content in 'black-powder' found in pigging operations on gas pipelines in Brazil, in particular, on the Campos Basin gas pipeline. Additionally, the chemical composition of such deposits was determined and an eventual correlation with 210 Pb concentration evaluated. Typical 'black-powder' generated in the natural gas pipeline from Campos Basin oilfield contains mainly iron oxide (∼81%) and residual organic matter (∼9%). The 210 Pb content ranges from 4.9 to 0.04 kBq kg -1 and seems to be inversely correlated with the distance to the platforms. On the other hand, 226 Ra concentration is higher on the pipeline branch between the platform and the onshore installations. 228 Ra was only observed in few samples, in particular, in the samples with the highest 226 Ra content

  15. Natural gas projects, strategies and economics

    International Nuclear Information System (INIS)

    Hamaide, G.

    2000-01-01

    This article summarizes the content of some of the posters presented during the WOC 9 working committee of the CMG 2000 worldwide gas congress: natural gas in the new worldwide energy balance; eastern Russia: the last gas projects; the new underwater technologies and the availability of natural gas. (J.S.)

  16. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Burger, Chris [Patrick Engineering Inc., Lisle, IL (United States); Wortman, David [Patrick Engineering Inc., Lisle, IL (United States); Brown, Chris [Battelle Memorial Inst., Richland, WA (United States); Hassan, Syed [Gulf Interstate Engineering, Houston, TX (United States); Humphreys, Ken [Futuregen Industrial Alliance, Inc., Washington, D.C. (United States); Willford, Mark [Futuregen Industrial Alliance, Inc., Washington, D.C. (United States)

    2016-03-31

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration

  17. Defining Toll Fee of Wheeling Renewable with Reference to a Gas Pipeline in Indonesia

    Science.gov (United States)

    Hakim, Amrullah

    2017-07-01

    Indonesia has a huge number of renewable energy sources (RE) however; the utilization of these is currently very low. The main challenge of power production is its alignment with consumption levels; supply should equal demand at all times. There is a strong initiative from corporations with high energy demand, compared to other sectors, to apply a renewable portfolio standard for their energy input, e.g. 15% of their energy consumption requirement must come from a renewable energy source. To support this initiative, the utilization of power wheeling will help large factories on industrial estates to source firm and steady renewables from remote sites. The wheeling renewable via PLN’s transmission line has been regulated under the Ministry Decree in 2015 however; the tariff or toll fee has not yet been defined. The potential project to apply wheeling renewable will obtain power supply from a geothermal power plant, with power demand from the scattered factories under one company. This is the concept driving the application of power wheeling in the effort to push the growth of renewable energy in Indonesia. Given that the capacity of PLN’s transmission line are normally large and less congested compared to distribution line, the wheeling renewable can accommodate the scattered factories locations which then results in the cheaper toll fee of the wheeling renewable. Defining the best toll fee is the main topic of this paper with comparison of the toll fee of the gas pipeline infrastructure in Indonesia, so that it can be applied massively to achieve COP21’s commitment.

  18. The developing human connectome project: A minimal processing pipeline for neonatal cortical surface reconstruction.

    Science.gov (United States)

    Makropoulos, Antonios; Robinson, Emma C; Schuh, Andreas; Wright, Robert; Fitzgibbon, Sean; Bozek, Jelena; Counsell, Serena J; Steinweg, Johannes; Vecchiato, Katy; Passerat-Palmbach, Jonathan; Lenz, Gregor; Mortari, Filippo; Tenev, Tencho; Duff, Eugene P; Bastiani, Matteo; Cordero-Grande, Lucilio; Hughes, Emer; Tusor, Nora; Tournier, Jacques-Donald; Hutter, Jana; Price, Anthony N; Teixeira, Rui Pedro A G; Murgasova, Maria; Victor, Suresh; Kelly, Christopher; Rutherford, Mary A; Smith, Stephen M; Edwards, A David; Hajnal, Joseph V; Jenkinson, Mark; Rueckert, Daniel

    2018-06-01

    The Developing Human Connectome Project (dHCP) seeks to create the first 4-dimensional connectome of early life. Understanding this connectome in detail may provide insights into normal as well as abnormal patterns of brain development. Following established best practices adopted by the WU-MINN Human Connectome Project (HCP), and pioneered by FreeSurfer, the project utilises cortical surface-based processing pipelines. In this paper, we propose a fully automated processing pipeline for the structural Magnetic Resonance Imaging (MRI) of the developing neonatal brain. This proposed pipeline consists of a refined framework for cortical and sub-cortical volume segmentation, cortical surface extraction, and cortical surface inflation, which has been specifically designed to address considerable differences between adult and neonatal brains, as imaged using MRI. Using the proposed pipeline our results demonstrate that images collected from 465 subjects ranging from 28 to 45 weeks post-menstrual age (PMA) can be processed fully automatically; generating cortical surface models that are topologically correct, and correspond well with manual evaluations of tissue boundaries in 85% of cases. Results improve on state-of-the-art neonatal tissue segmentation models and significant errors were found in only 2% of cases, where these corresponded to subjects with high motion. Downstream, these surfaces will enhance comparisons of functional and diffusion MRI datasets, supporting the modelling of emerging patterns of brain connectivity. Copyright © 2018 Elsevier Inc. All rights reserved.

  19. A method for simulating the release of natural gas from the rupture of high-pressure pipelines in any terrain.

    Science.gov (United States)

    Deng, Yajun; Hu, Hongbing; Yu, Bo; Sun, Dongliang; Hou, Lei; Liang, Yongtu

    2018-01-15

    The rupture of a high-pressure natural gas pipeline can pose a serious threat to human life and environment. In this research, a method has been proposed to simulate the release of natural gas from the rupture of high-pressure pipelines in any terrain. The process of gas releases from the rupture of a high-pressure pipeline is divided into three stages, namely the discharge, jet, and dispersion stages. Firstly, a discharge model is established to calculate the release rate of the orifice. Secondly, an improved jet model is proposed to obtain the parameters of the pseudo source. Thirdly, a fast-modeling method applicable to any terrain is introduced. Finally, based upon these three steps, a dispersion model, which can take any terrain into account, is established. Then, the dispersion scenarios of released gas in four different terrains are studied. Moreover, the effects of pipeline pressure, pipeline diameter, wind speed and concentration of hydrogen sulfide on the dispersion scenario in real terrain are systematically analyzed. The results provide significant guidance for risk assessment and contingency planning of a ruptured natural gas pipeline. Copyright © 2017. Published by Elsevier B.V.

  20. Health, safety and environment risk assessment in gas pipelines by indexing method:case of Kermanshah Sanandaj oil pipeline

    Directory of Open Access Journals (Sweden)

    Y. Hamidi

    2009-10-01

    Full Text Available Background and AimsUsing pipelines for oil products transportation involves ranges of safety, health and environmental risks, this option however, is dominant with numerous  advantages. The purpose of this study was; relative risk assessment of abovementioned risk in Kermanshah-Sanandaj Oil Pipeline.MethodsThe method used in this study was Kent Muhlbauer method in which relative risk was assessed using third-party damage, corrosion, design, incorrect operations and leak impact  factor.ResultsOnce applying this method, collection of required data and performing needed experiments, scoring results showed 96 risk segments along the pipeline length in which lengths 100+860, 101+384 and 103+670 had relative risk scores 9.74, 9.82 and 9.91 respectively and therefore these segments were identified as focal risk points and priority for improvement actions.ConclusionRegarding importance of pipeline failure, inspection and regular patrol along the pipeline route, precise control of cathodic protection of pipeline and using communication technologies such as SCADA or optical fibers along the pipeline route were amongst the mostimportant control action suggested by the study.

  1. Calculating the strength of a gas pipeline with a reinforced coating

    Energy Technology Data Exchange (ETDEWEB)

    Al' shanov, A P; Abdullaev, G T; Ali-Zade, A N

    1981-10-01

    Reinforcing the coatings of gas pipelines allows an increase in their operating pressure and thus their throughput; combined with strong insulation, such reinforcing materials as metal screens and fiberglass also protect the pipeline. Soviet analysts have mathematically derived the limiting internal pressure in a line with a reinforced coating as a function of the coating's thickness and mechanical properties. The method assumes that the pipe material is isotropic and elastic. The calculations help in determining (1) the dependence of the relative limiting pressure on the relative coating thickness and (2) the effect of the ratio of the Young's modulus of the reinforcing material to that of the pipe material upon the dependence of the relative limiting pressure on coating thickness. The analysis awaits experimental confirmation.

  2. Polar gamma ray mode for testing weld quality natural gas pipeline

    International Nuclear Information System (INIS)

    Shahout, A. M.; Mahmood, A.Sh.

    2005-01-01

    The polar gamma-ray radiography method was studied extensively, gamma ray from Ir 192 source was used to detect weld defects in the main gas pipeline extending from Kh oms to Tripoli, gamma ray radiographic inspections were carried out according to the Astm(1) standards, and the radiographs were analyzed according to quality specifications API(2) standard-1104. The polar gamma ray mode has been applied to specimens of weld joints of pipes used in this pipeline in the reg [the kilometer 118(3)] and [the kilometer 123], and weld joints in the SLR 7 stz in the region [the kilometer 125]. The results obtained from gamma-rays have discussed and analyzed

  3. Influence of old rectangular repair patches on the burst pressure of a gas pipeline

    International Nuclear Information System (INIS)

    Fazzini, Pablo Gabriel; Otegui, Jose Luis

    2006-01-01

    Seven full scale hydrostatic burst tests were carried out on pipes extracted from an API 5LX52 gas pipeline that contained rectangular and elliptical fillet welded patches and other repairs of different geometries. All breaks took place after widespread yielding. This analysis shows that the patches that generate greater risks are those that: (1) were attached to the pipeline at very low pressure (2) were placed to repair large defects (3) are rectangular, long in the direction of the pipe, and narrow (4) the quality of the weld is doubtful. Based on data reported by In Line Inspection (ILI), of the four conditions mentioned above, only the third can be assessed in order to quantify risks and to schedule replacements

  4. Web-based continuous internal corrosion monitoring of a sweet natural gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Cauchi, Sam; Vorozcovs, Andrew [Fiber Optic Systems Technology Inc. (FOX-TEK), Bedford, Nova Scotia (Canada)

    2009-07-01

    Inspection of pipelines susceptible to internal corrosion is a key ingredient in maintaining their reliable throughput. While conventional inspection consisting of in line inspection, radiography and ultrasound remain the mainstay of most integrity programs, challenging circumstances in some cases make the availability of such data inadequate, cost prohibitive, and at times entirely unavailable. These scenarios include aggressive internal corrosion, expensive excavation conditions, low or stagnant flow, and non-piggable pipeline segments. While some gas pipelines in these circumstances are considered relatively low risk and low consequence, due to the significant reclamation costs and cleanup time associated with liquid pipelines, those areas identified as being high-risk are often high-consequence and thus require a specialized inspection solution. For areas deemed to be at high-risk, or areas of low-risk with high consequence, Electrical Field Mapping (EFM) has provided a practical solution to safe operation without introducing expensive and potentially dangerous dig programs. Historically, however, this inspection approach has required manual data acquisition as part of a scheduled EFM site visit schedule. Due to the tedious nature of this data acquisition approach, the remoteness of some pipeline inspection sites and the complexity of data analysis, it has been difficult to closely monitor the most critical assets on a continuous basis. The manual component of this approach also often eliminates EFM as a practical solution due to lack of properly trained personnel. In this paper, we will discuss a new approach to data acquisition where data is acquired, transmitted, analyzed, and displayed completely automatically and remotely with virtually no human overhead or recurring operating costs. An overview of the PinPoint monitoring setup covering 180 degrees of pipe circumference is described. This advanced EFM system allows operators to observe, essentially in real

  5. Optimal design of a gas transmission network: A case study of the Turkish natural gas pipeline network system

    Science.gov (United States)

    Gunes, Ersin Fatih

    Turkey is located between Europe, which has increasing demand for natural gas and the geographies of Middle East, Asia and Russia, which have rich and strong natural gas supply. Because of the geographical location, Turkey has strategic importance according to energy sources. To supply this demand, a pipeline network configuration with the optimal and efficient lengths, pressures, diameters and number of compressor stations is extremely needed. Because, Turkey has a currently working and constructed network topology, obtaining an optimal configuration of the pipelines, including an optimal number of compressor stations with optimal locations, is the focus of this study. Identifying a network design with lowest costs is important because of the high maintenance and set-up costs. The quantity of compressor stations, the pipeline segments' lengths, the diameter sizes and pressures at compressor stations, are considered to be decision variables in this study. Two existing optimization models were selected and applied to the case study of Turkey. Because of the fixed cost of investment, both models are formulated as mixed integer nonlinear programs, which require branch and bound combined with the nonlinear programming solution methods. The differences between these two models are related to some factors that can affect the network system of natural gas such as wall thickness, material balance compressor isentropic head and amount of gas to be delivered. The results obtained by these two techniques are compared with each other and with the current system. Major differences between results are costs, pressures and flow rates. These solution techniques are able to find a solution with minimum cost for each model both of which are less than the current cost of the system while satisfying all the constraints on diameter, length, flow rate and pressure. These results give the big picture of an ideal configuration for the future state network for the country of Turkey.

  6. The Nabucco project's economic failure - Lessons for the European Union's foreign gas policy

    International Nuclear Information System (INIS)

    Finon, D.

    2010-01-01

    This article criticises the new strategy of the European Union's foreign gas policy. The new policy translates in the setting up of gas corridors to diversify importations in a context of increased political competition with Russia. The inherent limitations of the EU's plan to promote the Nabucco gas pipeline as merchant line without seeking exporter involvement in the project are analysed. Such limitations are analysed through various economic prospects. A micro-economic calculation shows the significance of the use rate of a gas pipeline for profitability. The competition theory shows the possibility for an existing dominating firm to compete with a newcomer's investment by building equipment likely to pre-empt access to the resources. The transaction cost saving shows how long term undertakings between producers and suppliers are necessary for the development of transit infrastructures and distant gas fields. The article ends with the need for economic relevance in the EU's gas policy actions. (author)

  7. 76 FR 39864 - Tennessee Gas Pipeline Company; Dominion Gas Transmission, Inc.; Notice of Availability of the...

    Science.gov (United States)

    2011-07-07

    ...\\ A ``pig'' is a tool that is inserted into and moves through the pipeline, and is used for cleaning....ferc.gov using the eLibrary link. A limited number of copies of the EA are available for distribution..., which is located on the Commission's Web site at http://www.ferc.gov under the link to Documents and...

  8. Health, safety and environment risk assessment in gas pipelines by indexing method:case of Kermanshah Sanandaj oil pipeline

    OpenAIRE

    Y. Hamidi; I. Mohamadfam; M. Motamedzadeh

    2009-01-01

    Background and AimsUsing pipelines for oil products transportation involves ranges of safety, health and environmental risks, this option however, is dominant with numerous  advantages. The purpose of this study was; relative risk assessment of abovementioned risk in Kermanshah-Sanandaj Oil Pipeline.MethodsThe method used in this study was Kent Muhlbauer method in which relative risk was assessed using third-party damage, corrosion, design, incorrect operations and leak impact  factor.Results...

  9. Project for Offshore Horizontal Directional Drilling (HDD for Pipeline Crossing in Bukit Tua, Indonesia

    Directory of Open Access Journals (Sweden)

    Yusuf Sofyan

    2016-09-01

    Full Text Available Horizontal Directional Drilling (HDD is commonly associated with well exploration activity, onshore road crossing, nearshore pipeline installation, and offshore pipeline crossing which requires precise alignment of two barges from one to the other. Here, the purpose of this study was to show one of the projects that was successfully performed on December 2013 for the Bukit Tua Project in East Java, Indonesia costing USD 8 Million. From this project experience, there are 6 Best Practices in HDD Offshore Project for Pipeline Crossing Application (first in region which will serve as a guide to future projects in replicating similar success. Out from 6 Best practices, there are two main recipes for success of HDD offshore for offshore crossings which are the drilling fluid also known as mud, and the Gyro Steering Tool (GST. First, mud parameter varies on case by case basis depending on the soil condition at the location where HDD will be performed. Failure to maintain the above parameters may result in catastrophic failure whereby the bore hole may collapse and pipe may get stuck underneath the seabed. Secondly, the beauty of GST is extremely accurate and unaffected by other metal anomalies during drilling process, thus ensuring the curve profile and direction of drilling are as per design throughout the whole process.

  10. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  11. Automated processing pipeline for neonatal diffusion MRI in the developing Human Connectome Project.

    Science.gov (United States)

    Bastiani, Matteo; Andersson, Jesper L R; Cordero-Grande, Lucilio; Murgasova, Maria; Hutter, Jana; Price, Anthony N; Makropoulos, Antonios; Fitzgibbon, Sean P; Hughes, Emer; Rueckert, Daniel; Victor, Suresh; Rutherford, Mary; Edwards, A David; Smith, Stephen M; Tournier, Jacques-Donald; Hajnal, Joseph V; Jbabdi, Saad; Sotiropoulos, Stamatios N

    2018-05-28

    The developing Human Connectome Project is set to create and make available to the scientific community a 4-dimensional map of functional and structural cerebral connectivity from 20 to 44 weeks post-menstrual age, to allow exploration of the genetic and environmental influences on brain development, and the relation between connectivity and neurocognitive function. A large set of multi-modal MRI data from fetuses and newborn infants is currently being acquired, along with genetic, clinical and developmental information. In this overview, we describe the neonatal diffusion MRI (dMRI) image processing pipeline and the structural connectivity aspect of the project. Neonatal dMRI data poses specific challenges, and standard analysis techniques used for adult data are not directly applicable. We have developed a processing pipeline that deals directly with neonatal-specific issues, such as severe motion and motion-related artefacts, small brain sizes, high brain water content and reduced anisotropy. This pipeline allows automated analysis of in-vivo dMRI data, probes tissue microstructure, reconstructs a number of major white matter tracts, and includes an automated quality control framework that identifies processing issues or inconsistencies. We here describe the pipeline and present an exemplar analysis of data from 140 infants imaged at 38-44 weeks post-menstrual age. Copyright © 2018 The Authors. Published by Elsevier Inc. All rights reserved.

  12. Rehabilitation of Sao Sebastiao-Cubatao oil pipeline: integrated planning and action - key for project success

    Energy Technology Data Exchange (ETDEWEB)

    Serodio, Conrado J.M. [GDK S.A., Salvador, BA (Brazil)

    2009-12-19

    The execution of the OSBAT 24{sup o}il pipeline rehabilitation project, comprising the substitution of a 30 km section of the 37 years old pipeline has become a real benchmark in the history of this kind of job. The pipeline is inserted in one of the most sensitive environmental areas of the Sao Paulo State - the last Environmental Protection Area of the Mata Atlantica . The growth of human presence in its surroundings during the last three decades, has caused the right-of-way to be totally confined by luxury housing developments, streets, highways and resorts, as well as by the local communities and their activities, schools, and commerce. The pipeline runs through the Serra do Mar unstable mountain range slopes, with sequences of very steep hills and ravines followed by swamps and rivers. The success of such a challenging project - assembling the new line in a narrow ROW with all its restrictions, where the old line was still in operation, and complying with the tight work schedule required by PETROBRAS, was only possible due to a carefully managed combination of: accurate planning, best engineering methods and equipment and experienced workforce, deeply integrated in a massive effort towards safety, environmental care and social responsibility. (author)

  13. Operator splitting method for simulation of dynamic flows in natural gas pipeline networks

    Science.gov (United States)

    Dyachenko, Sergey A.; Zlotnik, Anatoly; Korotkevich, Alexander O.; Chertkov, Michael

    2017-12-01

    We develop an operator splitting method to simulate flows of isothermal compressible natural gas over transmission pipelines. The method solves a system of nonlinear hyperbolic partial differential equations (PDEs) of hydrodynamic type for mass flow and pressure on a metric graph, where turbulent losses of momentum are modeled by phenomenological Darcy-Weisbach friction. Mass flow balance is maintained through the boundary conditions at the network nodes, where natural gas is injected or withdrawn from the system. Gas flow through the network is controlled by compressors boosting pressure at the inlet of the adjoint pipe. Our operator splitting numerical scheme is unconditionally stable and it is second order accurate in space and time. The scheme is explicit, and it is formulated to work with general networks with loops. We test the scheme over range of regimes and network configurations, also comparing its performance with performance of two other state of the art implicit schemes.

  14. Quantifying impact reduction due to avoidance, minimization and restoration for a natural gas pipeline in the Peruvian Andes

    International Nuclear Information System (INIS)

    Sahley, C.T.; Vildoso, B.; Casaretto, C.; Taborga, P.; Ledesma, K.; Linares-Palomino, R.; Mamani, G.; Dallmeier, F.; Alonso, A.

    2017-01-01

    We present monitoring methods and quantitative biodiversity data to document components of the mitigation hierarchy. We estimated avoidance, minimization, restoration and impact reduction in quality hectares for the 25 m wide right of way of a 408 km natural gas buried pipeline that crosses 14 Ecological Landscape Units (ELUs) in the tropical Andes of Peru. We found that applying the mitigation hierarchy as part of a comprehensive biodiversity action plan substantially reduced impacts on biodiversity in all habitats studied. Avoidance and right of way minimization contributed to significant impact reduction. We quantified impact reduction during construction and operation on the right of way of the pipeline over a five-year period and found that restoration was the greatest contributor to reducing impacts. We documented that most ELUs have a positive restoration trajectory. We also documented how monitoring over large scale spatial scales, in combination with site-specific monitoring, generated data for management to determine restoration priorities and impact mitigation. A biodiversity action plan that incorporated the mitigation hierarchy and a science-based biodiversity monitoring and assessment program contributed to biodiversity management of the project and played an important role in minimizing and managing impacts. - Highlights: •Quantitative data for mitigation hierarchy components are presented. •Application of the mitigation hierarchy reduced impacts on biodiversity. •A biodiversity monitoring program provided data to reduce impacts.

  15. Determination of flow rates of oil, water and gas in pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Roach, G J; Watt, J S; Zastawny, H W [Commonwealth Scientific and Industrial Research Organisation (CSIRO), Lucas Heights, NSW (Australia). Div. of Mineral Physics

    1994-12-31

    This paper describes a multiphase flow meter developed by CSIRO for determining of the flow rates of oil, water and gas in high pressure pipelines, and the results of a trial of this flow meter on an offshore oil platform. Two gamma-ray transmission gauges are mounted about a pipeline carrying the full flow of oil, water and gas. The flow rates are determined by combining single energy gamma-ray transmission measurements which determine the mass per unit area of fluids in the gamma-ray beam as a function of time, dual energy gamma-ray transmission (DUET) which determine the approximate mass fraction of oil in the liquids, cross-correlation of gamma-ray transmission measurements, with one gauge upstream of the other, which determines flow velocity, pressure and temperature measurements, and knowledge of the specific gravities of oil and (salt) water, and solubility of the gas in the liquids, all as a function of pressure and temperature. 3 figs.

  16. Determination of flow rates of oil, water and gas in pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Roach, G.J.; Watt, J.S.; Zastawny, H.W. [Commonwealth Scientific and Industrial Research Organisation (CSIRO), Lucas Heights, NSW (Australia). Div. of Mineral Physics

    1993-12-31

    This paper describes a multiphase flow meter developed by CSIRO for determining of the flow rates of oil, water and gas in high pressure pipelines, and the results of a trial of this flow meter on an offshore oil platform. Two gamma-ray transmission gauges are mounted about a pipeline carrying the full flow of oil, water and gas. The flow rates are determined by combining single energy gamma-ray transmission measurements which determine the mass per unit area of fluids in the gamma-ray beam as a function of time, dual energy gamma-ray transmission (DUET) which determine the approximate mass fraction of oil in the liquids, cross-correlation of gamma-ray transmission measurements, with one gauge upstream of the other, which determines flow velocity, pressure and temperature measurements, and knowledge of the specific gravities of oil and (salt) water, and solubility of the gas in the liquids, all as a function of pressure and temperature. 3 figs.

  17. A novel process for small-scale pipeline natural gas liquefaction

    International Nuclear Information System (INIS)

    He, T.B.; Ju, Y.L.

    2014-01-01

    Highlights: • A novel process was proposed to liquefy natural gas by utilizing the pressure exergy. • The process is zero energy consumption. • The maximum liquefaction rate of the process is 12.61%. • The maximum exergy utilization rate is 0.1961. • The economic analysis showed that the payback period of the process is quit short. - Abstract: A novel process for small-scale pipeline natural gas liquefaction is designed and presented. The novel process can utilize the pressure exergy of the pipeline to liquefy a part of natural gas without any energy consumption. The thermodynamic analysis including mass, energy balance and exergy analysis are adopted in this paper. The liquefaction rate and exergy utilization rate are chosen as the objective functions. Several key parameters are optimized to approach the maximum liquefaction rate and exergy utilization rate. The optimization results showed that the maximum liquefaction rate is 12.61% and the maximum exergy utilization rate is 0.1961. What is more, the economic performances of the process are also discussed and compared by using the maximum liquefaction rate and exergy utilization rate as indexes. In conclusion, the novel process is suitable for pressure exergy utilization due to its simplicity, zero energy consumption and short payback period

  18. Determination of flow rates of oil, water and gas in pipelines

    International Nuclear Information System (INIS)

    Roach, G.J.; Watt, J.S.; Zastawny, H.W.

    1993-01-01

    This paper describes a multiphase flow meter developed by CSIRO for determining of the flow rates of oil, water and gas in high pressure pipelines, and the results of a trial of this flow meter on an offshore oil platform. Two gamma-ray transmission gauges are mounted about a pipeline carrying the full flow of oil, water and gas. The flow rates are determined by combining single energy gamma-ray transmission measurements which determine the mass per unit area of fluids in the gamma-ray beam as a function of time, dual energy gamma-ray transmission (DUET) which determine the approximate mass fraction of oil in the liquids, cross-correlation of gamma-ray transmission measurements, with one gauge upstream of the other, which determines flow velocity, pressure and temperature measurements, and knowledge of the specific gravities of oil and (salt) water, and solubility of the gas in the liquids, all as a function of pressure and temperature. 3 figs

  19. Logistic management system for natural gas transportation by pipelines; Sistema de gestao de logistica de transporte de gas por gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Sidney Pereira dos; Castro, Antonio Orestes de Salvo [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Leal, Jose Eugenio [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil)

    2008-07-01

    An efficient management of the natural gas business chain, based on pipeline transmission network and taking into consideration the interaction between the main players such as shippers, suppliers, transmission companies and local distribution companies, requires the use of decision-making support systems to maximize resources and mitigate contingencies due to gas supply shortfalls, operational contingencies from scheduled and non-scheduled equipment outages as well as market demand shortfalls. This work presents a practical utilization of technologies such as thermohydraulic simulation of gas flow through pipelines, Monte Carlo simulation for compressor station availability studies and economic risk evaluation related to potential revenue losses and contractual penalties and linear programming for maximization and minimization objective function. The proposed system allows the definition of the optimum availability level to be maintained by the Transporter, by means of installing redundancy, to mitigate losses related to revenue and contractual penalties. Identifies, quantifies and justifies economically the installation of stand-by compressor units, mitigating Transporter exposure to losses due to capacity shortfalls as consequence of scheduled and non-scheduled outages. (author)

  20. Hierarchical leak detection and localization method in natural gas pipeline monitoring sensor networks.

    Science.gov (United States)

    Wan, Jiangwen; Yu, Yang; Wu, Yinfeng; Feng, Renjian; Yu, Ning

    2012-01-01

    In light of the problems of low recognition efficiency, high false rates and poor localization accuracy in traditional pipeline security detection technology, this paper proposes a type of hierarchical leak detection and localization method for use in natural gas pipeline monitoring sensor networks. In the signal preprocessing phase, original monitoring signals are dealt with by wavelet transform technology to extract the single mode signals as well as characteristic parameters. In the initial recognition phase, a multi-classifier model based on SVM is constructed and characteristic parameters are sent as input vectors to the multi-classifier for initial recognition. In the final decision phase, an improved evidence combination rule is designed to integrate initial recognition results for final decisions. Furthermore, a weighted average localization algorithm based on time difference of arrival is introduced for determining the leak point's position. Experimental results illustrate that this hierarchical pipeline leak detection and localization method could effectively improve the accuracy of the leak point localization and reduce the undetected rate as well as false alarm rate.

  1. Hierarchical Leak Detection and Localization Method in Natural Gas Pipeline Monitoring Sensor Networks

    Directory of Open Access Journals (Sweden)

    Ning Yu

    2011-12-01

    Full Text Available In light of the problems of low recognition efficiency, high false rates and poor localization accuracy in traditional pipeline security detection technology, this paper proposes a type of hierarchical leak detection and localization method for use in natural gas pipeline monitoring sensor networks. In the signal preprocessing phase, original monitoring signals are dealt with by wavelet transform technology to extract the single mode signals as well as characteristic parameters. In the initial recognition phase, a multi-classifier model based on SVM is constructed and characteristic parameters are sent as input vectors to the multi-classifier for initial recognition. In the final decision phase, an improved evidence combination rule is designed to integrate initial recognition results for final decisions. Furthermore, a weighted average localization algorithm based on time difference of arrival is introduced for determining the leak point’s position. Experimental results illustrate that this hierarchical pipeline leak detection and localization method could effectively improve the accuracy of the leak point localization and reduce the undetected rate as well as false alarm rate.

  2. Hierarchical Leak Detection and Localization Method in Natural Gas Pipeline Monitoring Sensor Networks

    Science.gov (United States)

    Wan, Jiangwen; Yu, Yang; Wu, Yinfeng; Feng, Renjian; Yu, Ning

    2012-01-01

    In light of the problems of low recognition efficiency, high false rates and poor localization accuracy in traditional pipeline security detection technology, this paper proposes a type of hierarchical leak detection and localization method for use in natural gas pipeline monitoring sensor networks. In the signal preprocessing phase, original monitoring signals are dealt with by wavelet transform technology to extract the single mode signals as well as characteristic parameters. In the initial recognition phase, a multi-classifier model based on SVM is constructed and characteristic parameters are sent as input vectors to the multi-classifier for initial recognition. In the final decision phase, an improved evidence combination rule is designed to integrate initial recognition results for final decisions. Furthermore, a weighted average localization algorithm based on time difference of arrival is introduced for determining the leak point’s position. Experimental results illustrate that this hierarchical pipeline leak detection and localization method could effectively improve the accuracy of the leak point localization and reduce the undetected rate as well as false alarm rate. PMID:22368464

  3. Pigging analysis for gas-liquid two phase flow in pipelines

    International Nuclear Information System (INIS)

    Kohda, K.; Suzukawa, Y.; Furukawa, H.

    1988-01-01

    A new method to analyze transient phenomena caused by pigging in gas-liquid two-phase flow is developed. During pigging, a pipeline is divided into three sections by two moving boundaries, namely the pig and the leading edge of the liquid slug in front of the pig. The basic equations are mass, momentum and energy conservation equations. The boundary conditions at the moving boundaries are determined from the mass conservation across the boundaries, etc. A finite difference method is used to solve the equations numerically. The method described above is also capable of analyzing transient two-phase flow caused by pressure and flow rate changes. Thus the over-all analysis of transient two-phase flow in pipelines becomes possible. A series of air-water two-phase flow pigging experiments was conducted using 105.3 mm diameter and 1436.5 m long test pipeline. The agreement between the measured and the calculated results is very good

  4. Theoretical study and design of a low-grade heat-driven pilot ejector refrigeration machine operating with butane and isobutane and intended for cooling of gas transported in a gas-main pipeline

    KAUST Repository

    Petrenko, V.O.; Volovyk, O.S.

    2011-01-01

    This paper describes the construction and performance of a novel combined system intended for natural gas transportation and power production, and for cooling of gas transported in a gas-main pipeline. The proposed system includes a gas turbine

  5. Determination of the longest permissible distance between expansion compensators in gas transmission pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Huening, R [Fachhochschule Muenster, Burgsteinfurt (Germany, F.R.). Fachbereich Versorgungstechnik

    1977-01-01

    In order to effectively protect long-distance gas pipelines against mountain damage in the areas in which underground mining is done, expansion compensators must be built in at certain distances. The tests to determine the slippage resistance and the highest permissible distance of expanders Lsub(max) in a transmission line NW 600 having a plastic insulation are described in this work. In addition, a way of calculating the Lsub(max) value from the existing data for pipes of varying diameter and different insulating material is shown.

  6. Axisymmetric wave propagation in gas shear flow confined by a rigid-walled pipeline

    International Nuclear Information System (INIS)

    Chen Yong; Huang Yi-Yong; Chen Xiao-Qian; Bai Yu-Zhu; Tan Xiao-Dong

    2015-01-01

    The axisymmetric acoustic wave propagating in a perfect gas with a shear pipeline flow confined by a circular rigid wall is investigated. The governing equations of non-isentropic and isentropic acoustic assumptions are mathematically deduced while the constraint of Zwikker and Kosten is relaxed. An iterative method based on the Fourier–Bessel theory is proposed to semi-analytically solve the proposed models. A comparison of numerical results with literature contributions validates the present contribution. Meanwhile, the features of some high-order transverse modes, which cannot be analyzed based on the Zwikker and Kosten theory, are analyzed (paper)

  7. The influence of the internal microbiome on the materials used for construction of the transmission natural gas pipelines in the Lodz Province

    OpenAIRE

    Staniszewska Agnieszka; Jastrzębska Magdalena; Ziemiński Krzysztof

    2017-01-01

    This paper presents investigation results of the influence of gas microbes on the biocorrosion rate of the materials used for gas pipelines construction in the Lodz Province. Samples of two types of carbon steel and cast iron were stored in the laboratory pipeline model reflecting the real conditions of working natural gas pipelines were. In the next step the influence of cathodic protection with parameters recommended for protection of underground structures was tested. Analyses of biologica...

  8. Cost analysis of teg-powered and solar-powered cathodic protection system for a-50 km long buried natural gas pipeline located in Sindh, Pakistan

    International Nuclear Information System (INIS)

    Shahid, M.; Inam, F.; Farooq, M.; Khan, F.N.

    2005-01-01

    Corrosion leaks are of significant concern to oil and gas industry and is considered to be the largest controllable factor in pipeline safety. Cathodic Protection (CP) is a well-established method for preventing corrosion of metallic materials. Electrical power is required and it is usually difficult and expensive to install conventional power lines in remote areas for readily available power supply. Oil/gas organizations make use of thermo-electric generators (TEG), which is relatively expensive in terms of running expenditures. Utilization of renewable energies is now being widely explored due to potential danger of running out of natural resources and dates back mid of 20th century [I]. However, use of solar powered CP system for oil/gas pipelines hasn't been encouraged much in Pakistan, probably due to lack of understanding. A project was undertaken for designing a solar powered CP system for a 52.4 km buried gas pipeline located at Sui/Sara gas fields (Latitude 27.5) of Tullow Pakistan (Dev.) Ltd. in Dharki, Sindh, Pakistan. After detailed analysis of soil condition, electrochemical testing, local climatic variation and cost analysis, it has been revealed that use of solar power is quite feasible for the above-mentioned pipeline section. Cost analysis and comparison have also favored this system since the maintenance cost of the solar-powered system is much less compared to TEG system. Installation cost of the solar system is about 1.57 times the cost of TEG; however, the maintenance cost is only -20% of that for TEG system. The higher installation cost has been estimated to be recoverable in less than one year of service. (author)

  9. Analysis of the changes in the consumption profile of the system use gas in Bolivia-Brazil Gas Pipeline after integration with the Campinas-Rio Gas Pipeline; Analise das alteracoes do perfil de consumo de gas de sistema no Gasoduto Bolivia-Brasil apos a interligacao deste gasoduto com o Campinas-Rio

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Almir Beserra dos; Bisaggio, Helio da Cunha; Veloso, Luciano de Gusmao [Agencia Nacional do Petroleo, Gas Natural e Biocombustiveis (ANP), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The natural gas pipeline transport is carried out by one or more compression stations. Each station possesses one or more compressors. The compressor's fuel is usually natural gas itself. The amount of natural gas consumed by the compressors fluctuates daily according to the demand at the city-gates. The daily operational result of a pipeline is known as imbalance. The imbalance is the difference between the natural gas entering into a in a pipeline and the volume delivered in the city-gates added to system use gas. The imbalance analyses in a pipeline that uses natural gas powered compressors requires the analyses of the system use gas. The aim of this work is to study the system use gas in the Bolivia-Brazil pipeline using the available data from the Superintendencia de Comercializacao e Movimentacao de Petroleo, seus Derivados e Gas Natural - ANP and compare the change of the volume consumed before and after the entry into operation of the Campinas-Rio gas pipeline. (author)

  10. Guidelines For Evaluation Of Natural Gas Projects

    International Nuclear Information System (INIS)

    Farag, H.; El Messirie, A.

    2004-01-01

    This paper is objected to give guidelines for natural gas projects appraisal These guidelines are summarized in modeling of natural gas demand forecast and energy pricing policies for different gas consumers mainly in the manufacturing, mining, transport, trade and agriculture sectors. Analysis of the results is made through sensitivity analysis and decision support system ( DSS )

  11. An analysis of the economic impact of non-pipeline options for developing Newfoundland's offshore natural gas resources

    International Nuclear Information System (INIS)

    Locke, W.; Millan, S.; Rodgers, B.

    2001-06-01

    The technical and economic feasibility of four non-pipeline development options for Newfoundland's offshore natural gas resources are examined. The options are: compressed natural gas (CNG) that is incremental to FPSO oil development (CNG FPSO Incremental); CNG as part of a Grand Bank System Gas Hub( CNG GBS Gas Hub); liquefied natural gas (LNG) that is incremental to FPSO oil development (LNG FPSO Incremental) and combined Fischer-Tropsch (gas-to-liquid technology) that is incremental to FPSO oil development (combined methanol/F-T). The economic impacts of each development option were considered in terms of project viability, employment and income impacts created through the supply of goods and services, employment effects resulting from project expenditures, incomes generated to Newfoundland factors of production, GDP impacts, and provincial treasury impacts, net of equalization losses. Results indicate that the largest employment and income impacts on the Newfoundland economy would be generated by the CNG GBS Gas Hub option (2,000 person-years of employment per year and $110 million income annually). The other three cases provide an equivalent level of benefits with an annual average of 1,650 person-years of employment and $90 million in incomes to business and labour. Each option is expected to generate between $16 and $21 million per annum to the Newfoundland treasury, net of equalization losses. GDP impacts are also close for all all four options, and provide no basis for preference of any option. In terms of project viability, the CNG FPSO Incremental option is considered by far the most attractive with a 33.7 per cent rate of return and a net present value of $1 billion, followed by the CNG GBS Gas Hub option at 18.3 per cent rate of return and a net present value of $317 million. The LNG FPSO incremental option has an internal rate of return of 17.8 per cent and a net present value of $263 million. The combined methanol/F-T option is not considered

  12. Monitoring internal corrosion in natural gas pipelines; Monitoracao da corrosao interna em gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Nobrega, Ana C.V.; Silva, Djalma R.; Pimenta, Gutemberg S. [Universidade Federal do Rio Grande do Norte, Natal, RN (Brazil); Barbosa, Andrea F.F. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil). Centro de Pesquisas

    2003-07-01

    For susceptibilities to the corrosion of the pipelines and equipment made in carbon steel and used by the natural gas, it makes be necessary to identify the acting corrosive agents and monitoring them along time, controlling failures for internal corrosion. Also, of that process it origins the black powder (solid particles) that can not commit the structural integrity of the equipment, but it can also bring the company other implications very serious, like quality of the sold product, as well as stops due to blockages and wastes for erosion of the equipment. The monitoring methodology and control of the corrosion in field consisted of the use of corrosion test equipment, chemical characterization of samples of black powder and liquids and analysis of the operational data of processes and plants. Like this, it was identified for the gas pipeline in analysis the most responsible parameters for the corrosive action of the fluid, establishing a controlling methodology and operational actions to maintain the corrosion rates at safe levels and structural warranty of the same. (author)

  13. Reliability centred maintenance of the cathodic protection system of the Bolivia-Brazil gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Coelho, Jorge Fernando Pereira [Transportadora Brasileira Gasoduto, TBG, Bolivia-Brasil S.A (Brazil)

    2004-07-01

    This paper presents the results of the Reliability-Centred Maintenance study performed on the Cathodic Protection System of the Bolivia -Brazil Gas Pipeline. The Cathodic Protection installation for the north spread (from Corumba to Guararema, 1413 km) was commissioned in March 1999 and for the south spread (from Campinas to Porto Alegre, 1180 km) one year after. The protection against corrosion of the buried external surface of our gas pipeline is provided, primarily, by an high-efficient external coating, complemented by a impressed current cathodic protection system consisting of: - Forty-one rectifiers and respective anodes ground beds; - One solar panel and respective anodes ground beds; - Fifty-nine insulating joints and respective protective devices; - Nine hundred and ninety pipe-to-soil test stations; - Thirty-six pipe-to-soil remote monitoring devices; - Forty-one electrical power feeder network to the rectifiers. The rectifiers/anodes ground beds are installed at each 50 km approximately, including the solar panel, and the pipe-to-soil test stations at each 2.5 km, under different environment conditions. The insulating joints and theirs protective devices are installed inside stations (launch and receive scrapers, compression and metering) and city-gates, as well, the pipe-to-soil remote monitoring devices. The cathodic protection system and electrical power feeder network are inspected and maintained by a TBG third part Contractor.

  14. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  15. Membrane-Coated Electrochemical Sensor for Corrosion Monitoring in Natural Gas Pipelines

    Directory of Open Access Journals (Sweden)

    J. Beck

    2017-07-01

    Full Text Available Electrochemical sensors can be used for a wide range of online in- situ process monitoring applications. However, the lack of a consistent electrolyte layer has previously limited electrochemical monitoring in gas and supercritical fluid streams. A solid state sensor is being designed that uses an ion conducting membrane to perform conductivity and corrosion measurements in natural gas pipelines up to 1000 psi. Initial results show that membrane conductivity measurements can be correlated directly to water content down to dew points of 1°C with good linearity. Corrosion monitoring can also be performed using methods such as linear polarization resistance and electrochemical impedance spectroscopy (EIS, though care must be taken in the electrode design to minimize deviation between sensors.

  16. Research on application of GIS and GPS in inspection and management of city gas pipeline network

    Science.gov (United States)

    Zhou, Jin; Meng, Xiangyin; Tao, Tao; Zhang, Fengpei

    2018-01-01

    To solve the problems existing in the current Gas Company patrol management, such as inaccurate attendance, whether or not the patrol personnel exceed the scope of patrol inspection. This paper Proposed that we apply the SuperMap iDeskTop 8C plug-in desktop GIS application and development platform, the positioning function of GPS and the data transmission function of 3G/4G/GPRS/Ethernet to develop a gas pipeline inspection management system. We build association between real-time data, pipe network information, patrol data, map information, spatial data and so on to realize the bottom data fusion, use the mobile location system and patrol management client to achieve real-time interaction between the client and the mobile terminal. Practical application shows that the system has completed the standardized management of patrol tasks, the reasonable evaluation of patrol work and the maximum utilization of patrol resources.

  17. Stress analysis and mitigation measures for floating pipeline

    Science.gov (United States)

    Wenpeng, Guo; Yuqing, Liu; Chao, Li

    2017-03-01

    Pipeline-floating is a kind of accident with contingency and uncertainty associated to natural gas pipeline occurring during rainy season, which is significantly harmful to the safety of pipeline. Treatment measures against pipeline floating accident are summarized in this paper on the basis of practical project cases. Stress states of pipeline upon floating are analyzed by means of Finite Element Calculation method. The effectiveness of prevention ways and subsequent mitigation measures upon pipeline-floating are verified for giving guidance to the mitigation of such accidents.

  18. Flammable gas project topical report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, G.D.

    1997-01-29

    The flammable gas safety issue was recognized in 1990 with the declaration of an unreviewed safety question (USQ) by the U. S. Department of Energy as a result of the behavior of the Hanford Site high-level waste tank 241-SY-101. This tank exhibited episodic releases of flammable gas that on a couple of occasions exceeded the lower flammability limit of hydrogen in air. Over the past six years there has been a considerable amount of knowledge gained about the chemical and physical processes that govern the behavior of tank 241-SY-1 01 and other tanks associated with the flammable gas safety issue. This report was prepared to provide an overview of that knowledge and to provide a description of the key information still needed to resolve the issue. Items covered by this report include summaries of the understanding of gas generation, retention and release mechanisms, the composition and flammability behavior of the gas mixture, the amounts of stored gas, and estimated gas release fractions for spontaneous releases. `Me report also discusses methods being developed for evaluating the 177 tanks at the Hanford Site and the problems associated with these methods. Means for measuring the gases emitted from the waste are described along with laboratory experiments designed to gain more information regarding rates of generation, species of gases emitted and modes of gas storage and release. Finally, the process for closing the USQ is outlined as are the information requirements to understand and resolve the flammable gas issue.

  19. Gas-liquid two-phase flow behavior in terrain-inclined pipelines for gathering transport system of wet natural gas

    DEFF Research Database (Denmark)

    Yang, Yan; Li, Jingbo; Wang, Shuli

    2018-01-01

    The Volume of Fluid method and Re-Normalisation Group (RNG) k-ε turbulence model were employed to predict the gas-liquid two-phase flow in a terrain-inclined pipeline with deposited liquids. The simulation was carried out in a 22.5 m terrain-inclined pipeline with a 150 mm internal diameter...... on the liquid level under the suction force which caused by the negative pressure around the elbow, and then it touched to the top of the pipe. When the liquid blocked the pipe, the pressure drop between the upstream and downstream of the elbow increased with the increase of the gas velocity. At larger gas...

  20. The Chad-Cameroon petroleum project: loaded dices on the pipeline; Projet petrolier Tchad-Cameroun: des pipes sur le pipe-line

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The project of a oil pipeline starting from Chad and passing threw Cameroon has raised several controversies. History has shown several times in the past that oil discovery in Africa is very often synonymous of the increase of corruption and dictatorship. Talking into account the political situation of both countries, this book explains how this project can be a source of anxiety, in particular concerning the populations' rights and the environment protection. (J.S.)

  1. The Chad-Cameroon petroleum project: loaded dices on the pipeline; Projet petrolier Tchad-Cameroun: des pipes sur le pipe-line

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The project of a oil pipeline starting from Chad and passing threw Cameroon has raised several controversies. History has shown several times in the past that oil discovery in Africa is very often synonymous of the increase of corruption and dictatorship. Talking into account the political situation of both countries, this book explains how this project can be a source of anxiety, in particular concerning the populations' rights and the environment protection. (J.S.)

  2. Research on Connection and Function Reliability of the Oil&Gas Pipeline System

    Directory of Open Access Journals (Sweden)

    Xu Bo

    2017-01-01

    Full Text Available Pipeline transportation is the optimal way for energy delivery in terms of safety, efficiency and environmental protection. Because of the complexity of pipeline external system including geological hazards, social and cultural influence, it is a great challenge to operate the pipeline safely and reliable. Therefore, the pipeline reliability becomes an important issue. Based on the classical reliability theory, the analysis of pipeline system is carried out, then the reliability model of the pipeline system is built, and the calculation is addressed thereafter. Further the connection and function reliability model is applied to a practical active pipeline system, with the use of the proposed methodology of the pipeline system; the connection reliability and function reliability are obtained. This paper firstly presented to considerate the connection and function reliability separately and obtain significant contribution to establish the mathematical reliability model of pipeline system, hence provide fundamental groundwork for the pipeline reliability research in the future.

  3. Underground pipeline corrosion

    CERN Document Server

    Orazem, Mark

    2014-01-01

    Underground pipelines transporting liquid petroleum products and natural gas are critical components of civil infrastructure, making corrosion prevention an essential part of asset-protection strategy. Underground Pipeline Corrosion provides a basic understanding of the problems associated with corrosion detection and mitigation, and of the state of the art in corrosion prevention. The topics covered in part one include: basic principles for corrosion in underground pipelines, AC-induced corrosion of underground pipelines, significance of corrosion in onshore oil and gas pipelines, n

  4. 76 FR 29333 - Pipeline Safety: Meetings of the Technical Pipeline Safety Standards Committee and the Technical...

    Science.gov (United States)

    2011-05-20

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Technical Hazardous Liquid Pipeline Safety Standards Committee AGENCY: Pipeline and Hazardous Materials... for natural gas pipelines and for hazardous liquid pipelines. Both committees were established under...

  5. Centar's gas centrifuge enrichment project

    International Nuclear Information System (INIS)

    Abajian, V.V.; Fishman, A.M.

    1976-01-01

    Plans for the building and operating of Centar Associates gas centrifuge uranium enrichment plant are described. Operating costs and machine manufacture are considered. Commitments with the utilities are summarised. (U.K.)

  6. [Research on lateral shearing interferometer for field monitoring of natural gas pipeline leak].

    Science.gov (United States)

    Zhang, Xue-Feng; Gao, Yu-Bin

    2012-09-01

    Aimed at the mechanical scanning spectroscopy equipment with poor anti-interference and anti-jamming ability, which affects the accuracy of its natural gas pipeline leak detection in the wild, a new type of lateral shearing interferometer system was designed. The system uses a beam splitter to get optical path difference by a mechanical scanning part, and it cancel the introduction of external vibration interference through the linkage between the two beam splitterw. The interference intensity of interference fringes produced was calculated, and analysis of a rotating beam splitter corresponds to the angle of the optical path difference function, solving for the maximum angle of the forward rotation and reverse rotation, which is the maximum optical path range. Experiments using the gas tank deflated simulated natural gas pipeline leak process, in the interference conditions, and the test data of the type WQF530 spectrometer and the new type of lateral shearing interferometer system were comparedt. The experimental results show that the relative error of both systems is about 1% in indoor conditions without interference. However, in interference environment, the error of WQF530 type spectrometer becomes larger, more than 10%, but the error of the new type of lateral shearing interferometer system is still below 5%. The detection accuracy of the type WQF530 spectrometer decreased significantly due to the environment. Therefore, the seismic design of the system can effectively offset power deviation and half-width increases of center wavelength caused by external interference, and compared to conventional mechanical scanning interferometer devices the new system is more suitable for field detection.

  7. Estimating Greenhouse Gas Emissions Level of A Natural Gas Pipeline – Case Study from A to B Point in West Java-Indonesia

    Directory of Open Access Journals (Sweden)

    Dianita Cindy

    2016-01-01

    Full Text Available Indonesia is one of the highest greenhouse emitters in the world. As a response of this problem, Indonesia declared the national action plan to focus on national greenhouse gas (GHG reduction by 26 % by 2020. To achieve this target, Government puts energy sector as one of the top priorities since it is the second strongest contributor to national GHG emissions. The main purpose of this paper is to apply the method of fugitive emissions calculation to the existing natural gas pipeline in Indonesia. Fugitive emissions are the major component of GHG emissions from natural gas systems and methane (CH4, the primary component of natural gas pipeline, is a potent GHG. Tiered approaches from Interstate Natural Gas Association of America (INGAA are implemented in this paper as the estimation guidelines. A case study of a natural gas pipeline system in Indonesia is analyzed to compare the GHG emissions level resulted from Tier 1 and Tier 2 methods. In these methods, the input data are pipeline length, the number of compressor stations, and the number of meter and pressure regulation stations. In this case, the GHG emissions level of Tier 2 is significantly different from Tier 1. The variation of pipeline length shows that for the length under 479.2 miles, Tier 1 gives lower amount of CO2 equivalent than Tier 2. The differences of these estimation methods and results can be furtherly developed to provide relevant information and recommendation for the Companies and Government to record the emissions level from natural gas transmission pipeline according to their needs and purposes.

  8. Real Time Implementation of Incremental Fuzzy Logic Controller for Gas Pipeline Corrosion Control

    Directory of Open Access Journals (Sweden)

    Gopalakrishnan Jayapalan

    2014-01-01

    Full Text Available A robust virtual instrumentation based fuzzy incremental corrosion controller is presented to protect metallic gas pipelines. Controller output depends on error and change in error of the controlled variable. For corrosion control purpose pipe to soil potential is considered as process variable. The proposed fuzzy incremental controller is designed using a very simple control rule base and the most natural and unbiased membership functions. The proposed scheme is tested for a wide range of pipe to soil potential control. Performance comparison between the conventional proportional integral type and proposed fuzzy incremental controller is made in terms of several performance criteria such as peak overshoot, settling time, and rise time. Result shows that the proposed controller outperforms its conventional counterpart in each case. Designed controller can be taken in automode without waiting for initial polarization to stabilize. Initial startup curve of proportional integral controller and fuzzy incremental controller is reported. This controller can be used to protect any metallic structures such as pipelines, tanks, concrete structures, ship, and offshore structures.

  9. Evaluation of the condensation potential of hydrocarbon fluids in the national gas pipeline system; establishing of adequate operational schemes

    International Nuclear Information System (INIS)

    Pineda Gomez, Cesar Augusto; Arenas Mantilla, Oscar Armando; Santos Santos, Nicolas

    2007-01-01

    For transporting industry of natural gas by pipeline systems, it's vital to guarantee the integrity of their lines, in order to decrease operational costs and prevent accidents that may damaging against people's safety, the environment or the infrastructure itself. in this paper it's presented the principal compounds from o technical study about principal net and its distribution branches to municipalities of the National System Transport of Natural Gas pointed by the Colombian Natural Gas Company - ECOGAS, (specifically the Cusiana - Porvenir - La Belleza, La Belleza - Cogua, La Belleza - Vasconia, Vasconia - Neiva and Vasconia - Cali gas lines, (see Figure 1). The principal objective is evaluate the possible condensation of hydrocarbons fluids inside gas lines, due to compositional characteristics of the gas, the different topographical conditions along the gas line route and the actual and future operational conditions to be implemented in the system. The evaluation performed over this gas streams, generates transcendental information in the creation of safe operational limits that minimizing the existence of obstacle problems and damages over pipeline systems and process equipment, due to the presence of liquid hydrocarbons inside these flow lines. This article has been prepared in four sections in order to guarantee easy access to each one of the steps involved in the study. Section one presents the compositional and thermodynamic analysis of feeding gas streams; in section two, its presented the required information for modeling gas lines with definition of the gas pipeline numerical simulation model in stable state; section three presents the sensitivity analysis for gas variation upon loading gas composition at the inlet point of the system, variation of the operational conditions (flow, pressure and gas temperature) and environment temperatures for the different inlet points (branches) with verification of compliance of the Unique Transport Regulation

  10. Technology assessment of long distance liquid natural gas pipelines. Phase 8. Cold utilization and rural service

    Energy Technology Data Exchange (ETDEWEB)

    1977-02-01

    This phase of the investigation presents a summary of material relating to: (1) actual or potential applications for the very large refrigeration effects inherent in the vaporization of liquid natural gas; and (2) rural service gas supplies adjacent to the route of a trunk liquid natural gas line. A variety of concepts for cold utilization are discussed. The Canadian prospects for cold utilization include: electric power generation; oxygen production for integration with a coal gasification project; and the use of refrigeration stages in the petrochemical processing of natural gas, for example, ethane separation and processing to produce ethylene and ammonia.

  11. Off-gas control project

    International Nuclear Information System (INIS)

    Torgerson, D.F.; Smith, I.M.

    1978-06-01

    A program to develop and study off-gas abatement techniques has recently been initiated at Whiteshell Nuclear Research Establishment (WNRE). This report provides information on the properties and expected behaviour of reprocessing plant off-gases, and outlines the experimental program to be undertaken. (author)

  12. New test for oil soluble/water dispersible gas pipeline inhibitors

    Energy Technology Data Exchange (ETDEWEB)

    Stegmann, D.W.; Asperger, R.G.

    1987-01-01

    The wheel test provides good mixing of the condensate and water phases, the coupons are exposed to both phases. Therefore, the wheel test cannot distinguish between inhibitors that need continuous mixing of the these phases to maintain a water dispersion of the inhibitor and inhibitors that will self disperse into the water. This concept becomes important for pipelines in stratified flow where the water can settle out. In these cases with low turbulence, the inhibitor must self disperse into the water to be effective. The paper describes a test method to measure the effectiveness of an inhibitor and its ability to self disperse. The effectiveness of several inhibitors as predicted by the new test method is discussed relative to data from the wheel test and breaker tests. Field performance of these inhibitors in a gas gathering line, with liquids in stratified flow, are cities and compared with the results of the various laboratory tests.

  13. Real-time electronic monitoring of a pitted and leaking gas gathering pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Asperger, R.G.; Hewitt, P.G.

    1986-08-01

    Hydrogen patch, flush electrical resistance, and flush linear polarization proves wre used with flush coupons to monitor corrosion rates in a pitted and leaking sour gas gathering line. Four inhibitors were evaluated in stopping the leaks. Inhibitor residuals and the amount and ratio of water and condensate in the lines were measured at five locations along the line. The best inhibitor reduced reduced the pit-leak frequency by over a factor of 10. Inhibitor usage rate was optimized using the hydrogen patch current as a measure of the instantaneous corrosion rate. Improper pigging was identified as a cause of corrosion transients. This problem is discussed in relation to the pigging of pipelines in stratified flow where moving fluids are the carriers for continuously injected corrosion inhibitors.

  14. Temperature factors effect on occurrence of stress corrosion cracking of main gas pipeline

    Science.gov (United States)

    Nazarova, M. N.; Akhmetov, R. R.; Krainov, S. A.

    2017-10-01

    The purpose of the article is to analyze and compare the data in order to contribute to the formation of an objective opinion on the issue of the growth of stress corrosion defects of the main gas pipeline. According to available data, a histogram of the dependence of defects due to stress corrosion on the distance from the compressor station was constructed, and graphs of the dependence of the accident density due to stress corrosion in the winter and summer were also plotted. Data on activation energy were collected and analyzed in which occurrence of stress corrosion is most likely constructed, a plot of activation energy versus temperature is plotted, and the process of occurrence of stress corrosion by the example of two different grades of steels under the action of different temperatures was analyzed.

  15. Natural gas pipeline leak detector based on NIR diode laser absorption spectroscopy.

    Science.gov (United States)

    Gao, Xiaoming; Fan, Hong; Huang, Teng; Wang, Xia; Bao, Jian; Li, Xiaoyun; Huang, Wei; Zhang, Weijun

    2006-09-01

    The paper reports on the development of an integrated natural gas pipeline leak detector based on diode laser absorption spectroscopy. The detector transmits a 1.653 microm DFB diode laser with 10 mW and detects a fraction of the backscatter reflected from the topographic targets. To eliminate the effect of topographic scatter targets, a ratio detection technique was used. Wavelength modulation and harmonic detection were used to improve the detection sensitivity. The experimental detection limit is 50 ppmm, remote detection for a distance up to 20 m away topographic scatter target is demonstrated. Using a known simulative leak pipe, minimum detectable pipe leak flux is less than 10 ml/min.

  16. A flameless catalytic combustion-based thermoelectric generator for powering electronic instruments on gas pipelines

    International Nuclear Information System (INIS)

    Xiao, Heng; Qiu, Kuanrong; Gou, Xiaolong; Ou, Qiang

    2013-01-01

    Highlights: ► MPPT is used to improve the feature that TEG output is sensitive to load variation. ► The improved feature makes TEG suitable to power electronic device on gas pipeline. ► Test shows heat transfer uniformity plays an important role in improving TEG output. ► It can get an optimized TEG by uniformly filling a thermal insulation material. - Abstract: This paper presents a flameless catalytic combustion-based thermoelectric power generator that uses commercial thermoelectric modules. The structure of the thermoelectric generator (TEG) is introduced and the power performance is measured based on a designed circuit system. The open circuit voltage of the TEG is about 7.3 V. The maximum power output can reach up to 6.5 W when the load resistance matches the TEG internal resistance. However, the system output is sensitive to load variation. To improve this characteristic, maximum power point tracking technique is used and results in an open circuit voltage of 13.8 V. The improved characteristic makes the TEG system a good charger to keep the lead acid battery fully charged so as to meet the needs of electronic instruments on gas pipelines. In addition, the combustion features have been investigated based on the temperature measurement. Test results show that the uniformity of combustion heat transfer process and the combustion chamber structure play important roles in improving system power output. It can get an optimized TEG system (maximum power output: 8.3 W) by uniformly filling a thermal insulation material (asbestos) to avoid a non-uniform combustion heat transfer process

  17. Risk Analysis on Leakage Failure of Natural Gas Pipelines by Fuzzy Bayesian Network with a Bow-Tie Model

    Directory of Open Access Journals (Sweden)

    Xian Shan

    2017-01-01

    Full Text Available Pipeline is the major mode of natural gas transportation. Leakage of natural gas pipelines may cause explosions and fires, resulting in casualties, environmental damage, and material loss. Efficient risk analysis is of great significance for preventing and mitigating such potential accidents. The objective of this study is to present a practical risk assessment method based on Bow-tie model and Bayesian network for risk analysis of natural gas pipeline leakage. Firstly, identify the potential risk factors and consequences of the failure. Then construct the Bow-tie model, use the quantitative analysis of Bayesian network to find the weak links in the system, and make a prediction of the control measures to reduce the rate of the accident. In order to deal with the uncertainty existing in the determination of the probability of basic events, fuzzy logic method is used. Results of a case study show that the most likely causes of natural gas pipeline leakage occurrence are parties ignore signage, implicit signage, overload, and design defect of auxiliaries. Once the leakage occurs, it is most likely to result in fire and explosion. Corresponding measures taken on time will reduce the disaster degree of accidents to the least extent.

  18. Study on quantitative risk assessment model of the third party damage for natural gas pipelines based on fuzzy comprehensive assessment

    International Nuclear Information System (INIS)

    Qiu, Zeyang; Liang, Wei; Lin, Yang; Zhang, Meng; Wang, Xue

    2017-01-01

    As an important part of national energy supply system, transmission pipelines for natural gas are possible to cause serious environmental pollution, life and property loss in case of accident. The third party damage is one of the most significant causes for natural gas pipeline system accidents, and it is very important to establish an effective quantitative risk assessment model of the third party damage for reducing the number of gas pipelines operation accidents. Against the third party damage accident has the characteristics such as diversity, complexity and uncertainty, this paper establishes a quantitative risk assessment model of the third party damage based on Analytic Hierarchy Process (AHP) and Fuzzy Comprehensive Evaluation (FCE). Firstly, risk sources of third party damage should be identified exactly, and the weight of factors could be determined via improved AHP, finally the importance of each factor is calculated by fuzzy comprehensive evaluation model. The results show that the quantitative risk assessment model is suitable for the third party damage of natural gas pipelines and improvement measures could be put forward to avoid accidents based on the importance of each factor. (paper)

  19. Papers of the Canadian Energy Pipeline Association's 7. annual climate change workshop : energy efficiency and greenhouse gas reduction opportunities

    International Nuclear Information System (INIS)

    2003-01-01

    This conference focused on the role that Canadian pipeline companies will play in addressing greenhouse gas emissions. Ninety-five per cent of Canada's oil and gas is transported by pipeline. The Canadian Energy Pipeline Association (CEPA) is a national association representing all the major crude oil and natural gas transportation companies in Canada which operate 100,000 kilometres of pipeline in the country. CEPA's ongoing commitment to climate change includes a commitment to participate in the climate change process, share best management practices, develop energy efficient technology, and position Canadian companies so that they can be part of the solution. It was emphasized that a strong commitment to an effective innovation strategy will be crucial to a successful long term energy policy that meets both economic and environmental objectives. One of the key messages at the conference was that Canada's climate change policies should be consistent with those of the United States, its major trading partner, to ensure that Canada is not placed at a competitive disadvantage within North American and world energy markets. It was also noted that greenhouse gas emissions should be reduced in all consuming and producing sectors of the economy through energy efficiency practices and not through reductions in Canadian industry output for domestic or export markets. Five presentations were indexed separately for inclusion in the database. tabs., figs

  20. 77 FR 43586 - Southern Star Central Gas Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment...

    Science.gov (United States)

    2012-07-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-479-000] Southern Star... abandonment of facilities by Southern Star Central Gas Pipeline, Inc. (Southern Star) in Logan and Oklahoma... concern. Southern Star provided landowners with a fact sheet prepared by the FERC entitled ``An Interstate...

  1. The Corrosion control in the Bolivia-Brazil Gas Pipeline; O controle da corrosao no Gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Coelho, Jorge Fernando Pereira [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper presents the techniques and procedures adopted for the corrosion control of the Bolivia-Brazil Gas Pipeline. In buried pipes, the corrosion process may occur on the external surface in contact with the surrounding soil as well on the internal surface in contact with the conveyed fluid, being necessary the simultaneous mitigation of the both processes. (author)

  2. Local wall thickness reductions in operative high-pressure gas pipelines; Lokale Wanddickenminderungen an in Betrieb befindlichen Gashochdruckleitungen

    Energy Technology Data Exchange (ETDEWEB)

    Hass, Georg [Netzdienste Rhein-Main GmbH, Frankfurt am Main (Germany); Hoffmann, Ulrich [Verbundnetz Gas AG (VNG), Leipzig (Germany); Konarske, Juergen [RWE Westfalen-Weser-Ems Netzservice GmbH, Recklinghausen (Germany); Soppa, Thorsten [NG Netz Gas+Wasser (Germany); Steiner, Michael [Open Grid Europe GmbH, Essen (Germany)

    2011-04-15

    TUeV Nord, Salzgitter Mannesmann Forschung and DVGW investigated methods to assess local wall thickness reductions in operative high-pressure gas pipelines. Methods described in the relevant literature were reviewed with regard to the limiting criteria defined for maximum permissible wall thickness reductions. (orig./GL)

  3. Hybrid Laser/GMAW of High Strength Steel Gas Transmission Pipelines

    Science.gov (United States)

    2008-07-01

    Pipelines will be an integral part of our energy distribution systems for the foreseeable future. Operators are currently considering the installation of tens of billions of dollars of pipeline infrastructure. In a number of cases, the cost of export...

  4. A precipitation-induced landslide susceptibility model for natural gas transmission pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Finley, Jason P. [Fugro William Lettis and Associates, Inc., Valencia, California (United States); Slayter, David L.; Hitchcock, Chris S. [Fugro William Lettis and Associates, Inc., Walnut Creek, California (United States); Lee, Chih-Hung [Pacific Gas and Electric Company, Gas Systems Integrity Management, Walnut Creek, California (United States)

    2010-07-01

    Landslides related to heavy rainfall can cause extensive damage to natural gas transmission pipelines. Fugro William Lettis and Associates Inc. have developed and implemented a geographic information system (GIS) model that evaluates near real-time precipitation-induced landslide susceptibility. The model incorporates state-wide precipitation data and geologically-based landslide classifications to produce rapid landslide risk evaluation for Pacific Gas and Electric Company's (PGandE) gas transmission system during winter rain storms in California. The precipitation data include pre-storm event quantitative precipitation forecasts (QPF) and post-storm event quantitative precipitation estimate (QPE) from the United States National Oceanic and Atmospheric Administration (NOAA). The geologic classifications are based on slope, susceptible geologic formations, and the locations of historic or known landslide occurrences. Currently the model is calibrated using qualitative measures. This paper describes the development of the model algorithm and input data, model results, calibration efforts, and the on-going research and landslide collection warranted for continued refinement of the model.

  5. Millennium Pipeline Presentation : a new northeast passage

    International Nuclear Information System (INIS)

    Wolnik, J.

    1997-01-01

    Routes of the proposed Millennium Pipeline project were presented. The pipeline is to originate at the Empress gas field in Alberta and link up to eastern markets in the United States. One of the key advantages of the pipeline is that it will have the lowest proposed rates from Empress to Chicago and through links via affiliates to New York and other eastern markets. It will include 380 miles of new 36-inch pipeline and have a capacity of 650 million cubic feet per day. In many instances it will follow existing rights-of-way. The pipeline is expected to be in service for the 1999 winter heating season. The project sponsors are Columbia Gas Transmission, CMS Energy, MCN Energy, and Westcoast Energy. 6 figs

  6. Pipelines to Brussels: Natural gas exporters' strategies in a changing European gas market

    International Nuclear Information System (INIS)

    Claes, D.H.

    1991-01-01

    On the political level several different processes will influence the future of the European gas market. The possibilities of large increases in demand due to environmental concerns, and economic development, particularly in Eastern Europe, are beginning to change the buyer's market of the 1980's into a seller's market in the 1990's. Turning to the individual producers, one should not rule out a possible extension of the Dutch export contracts beyond 2010, but the main actors are likely to be the Russian Federation and Norway, as the Algerians are unlikely to stabilize their economy and the political uncertainties. The Russian Federation and Norway seem to be in the best position to capture the demand increase assumed in the next ten to twenty years. However, if the demand forecasts of today turn out to be accurate, there is no reason to worry about future competition between the Russian Federation and Norway. The demand increase would give room for both producers to export large volumes to the European market. Even a conservative estimate of gas demand at about 300 billion m 3 in the year 2010, does give 90 billion m 3 to be filled in by additional deliveries. The ''environmental-scenario'', where a substantial number of coal and oil fired power stations are replaced with gas stations, could easily push demand up to 450 billion m 3 . In this scenario gas would take a larger share of the total energy consumption in Europe. This could make importers more concerned with diversification of their gas imports. On the other hand, the pressure for cleaner fuels could obtain a higher priority than diversification, especially if the political situation stabilizes in the exporting countries: the Russian Federation and Algeria. It could come to a choice between a concentration of gas imports from the Russian Federation and Norway, and the more polluting use of coal and oil. The solution to this choice is not obvious. 26 refs., 11 figs

  7. Central Arkansas Energy Project. Coal to medium-Btu gas

    Science.gov (United States)

    1982-05-01

    The Central Arkansas Energy Project has as its objective the conversion of coal in a central location to a more readily usable energy source, medium Btu gas (MBG), for use at dispersed locations as fuel for power production and steam generation, or as a feedstock for chemical processing. The project elements consist of a gasification facility to produce MBG from coal, a pipeline to supply the MBG to the dispersed sites. The end of line users investigated were the repowering or refueling of an existing Arkansas Power and Light Co. Generating station, an ammonia plant, and a combined cycle cogeneration facility for the production of steam and electricity. Preliminary design of the gasification plant including process engineering design bases, process flow diagrams, utility requirements, system description, project engineering design, equipment specifications, plot plan and section plot plans, preliminary piping and instrument diagrams, and facilities requirements. Financial analyses and sensitivities are determined. Design and construction schedules and manpower loadings are developed. It is concluded that the project is technically feasible, but the financial soundness is difficult to project due to uncertainty in energy markets of competing fuels.

  8. Optimising gas pipeline operation - factors to consider in selecting flow measurement technology; Gas flow measurement

    Energy Technology Data Exchange (ETDEWEB)

    Fromm, Frank

    2010-07-01

    Multipath ultrasonic transit-time flow meters (UFM) have been employed in the gas industries for many years. Since their inception in the early seventies, advancements in the technology have been made with regard to available configurations, electronics offered and sensor design. Today, UFMs have proven to be reliable, versatile and capable of meeting the demands of the gas markets. It is clear that various UFM technologies have different advantages with regards to design and application use, which ultimately makes one more appropriate than the other. (Author)

  9. Experimental study on flame propagation characteristics of Hydrogen premixed gas in gas pipeline

    Science.gov (United States)

    Ma, Danzhu; Li, Zhuang; Jia, Fengrui; Li, Zhou

    2018-06-01

    Hydrogen is the cleanest high-energy gas fuel, and also is the main industrial material. However, hydrogen is more explosive and more powerful than conventional gas fuels, which restricts its application. In particular, the expansion of premixed combustion under a strong constraint is more complicated, the reaction spreads faster. The flame propagation characteristics of premixed hydrogen/air were investigated by experiment. The mechanism of reaction acceleration is discussed, and then the speed of the flame propagation and the reaction pressure were tested and analysed.

  10. Pipelines integrity management in Transportadora de Gas del Sur; Gerenciamento de la integridad de gasoductos en Transportadora de Gas del Sur

    Energy Technology Data Exchange (ETDEWEB)

    Espineira, Eduardo [Transportadora de Gas del Sur (TGS) (Argentina). Gerencia de Integridad de Gasoductos

    2003-07-01

    To control the integrity of a buried gas pipeline system is not an easy task for a gas pipeline operator. As the threats that affect pipeline integrity are many, it is critical to obtain, visualize, and analyze a great quantity of data in order to ensure a safe and continuous gas supply. This task becomes even more complex in the case of pipelines installed long time ago, where time pays an important role in the formation and development of defects. It is essential to maintain a policy of permanent evaluation, monitoring and repair that allows to evaluate the integrity plan developed and to make the changes that might be necessary. The TGS pipeline system consists of 7400 Km of pipe with an average age of 30 years, going across a great variety of soils and zones with distinctive geographical features that demand the continuous investment of money. This study describes the integrity plan set up by TGS and its evolution in time, including the main tasks related to information gathering and analysis, as well as all rehabilitation tasks. The evaluation of the integrity plan implementation, and the evolution of failure rates in time with respect to the related investments are also described. Finally, the analysis includes the information management systems applied by TGS such as the Geographic Information System . (author)

  11. Preventive, reducing and compensation actions for environmental impacts of Coari-Manaus gas pipeline; Medidas preventivas, mitigadoras e compensatorias de impactos socioambientais do Projeto Gasoduto Coari-Manaus

    Energy Technology Data Exchange (ETDEWEB)

    Mannarino, Ronaldo P. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Rangel, Antonio Carlos F. [PETROBRAS, Rio de Janeiro, RJ (Brazil). Coordenacao de Projetos Especiais da Area de Gas e Energia

    2004-07-01

    The estimated reserve of natural gas of 124,5 billions m3 existent in the Solimoes basin it's the big thermometrical market existent on the Manaus city, actually supplied with liquid fuels, they had become economically viable the construction of a gas pipeline establishing connection it offers of the demand. However, given the complexity of the Amazonian landscape, the ambient aspects need to be studied with use of tools and methodologies integrators, also contemplating the social aspects. A multi discipline group of researches, led for Centro de Ciencias Ambientais from Universidade Federal do Amazonas - CCA/UFAM they had carried through diagnosis of the influences area of Coari-Manaus gas pipeline had as base research developed for PIATAM (Potenciais Impactos e Riscos Ambientais do Transporte de Petroleo e Gas no Amazonas) project during 24 months in the region enclosed for the tracing considered. During the study of UFAM and in the Official Audiences of the licence process had done consultation for the involved communities, and the results served of base for proposal to the prevention of negative impacts, reduce and compensation of inevitable impacts. The legal and institutional requisites are argued and are considered a way to consolidate the existing regulation on the subject having as basic premise the compatibility of the local and regional interests with the necessity of economic development of the country. (author)

  12. Construction of new tie-in in the Bolivia-Brazil Gas Pipeline (GASBOL) using hot tapping techniques; Derivacao do Gasoduto Bolivia-Brasil com a tecnica de hot-tapping

    Energy Technology Data Exchange (ETDEWEB)

    Frisoli, Caetano [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Frota, Cristiane Souto; Leite Filho, Ismael Casono; Lobao Filho, Jesualdo Pereira; Saavedra, Marcelo Curto [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    To supply 2,4 MM m3/d of natural gas to Tres Lagoas thermo electric plant, it was necessary to install a new delivery point of 12'' in the 32'' trunk line of Bolivia-Brazil gas pipeline. The most efficient method for executing new delivery points and maintenance repairs in pipelines is using the 'hot-tapping' technique, because there is no need to stop flow and blow down lines. This paper shows the project, specifications, planning and a detailed job execution to support this new city-gate, using a T split sleeve welded in the pipeline, explaining all the activities. Complex and innovative aspects related to the welding and inspection processes, executed in a API 5L X70 pipe at 92 kgf/cm{sup 2}, are also reported. (author)

  13. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS: Executive summary

    International Nuclear Information System (INIS)

    1994-01-01

    The Southeast Regional Wastewater Treatment Plant (SERWTP) Facilities Improvement Plan and Geysers Effluent Pipeline and Effluent Injection Project are proposed as a plan to provide expanded wastewater treatment capabilities and to dispose of the effluent by injection in The Geysers geothermal field for purposes of power production. The project is located predominantly in the County of Lake, California, and also in part of Sonoma County. The plan includes various conventional facilities improvements in wastewater treatment to a secondary level of treatment at the SWERWTP. The plan includes facilities to convey the treated effluent in a 26-mile, 24-inch inside diameter pipeline to the Southeast Geysers. The wastewater from the SERWTP would be supplemented by raw lake water diverted from nearby Clear Lake. At The Geysers, the effluent would be directed into a system of distribution lines to wells. In the geothermal reservoir, the water will be converted to steam and collected in production wells that will direct the steam to six existing power plants. This document is a summary of a combined full Environmental Impact Report (EIR) and Environmental Impact Statement (EIS). The EIR/EIS describes the environmental impacts of the various components of the project. Mitigation measures are suggested for reducing impacts to a less than significant level

  14. Oil and gas projects in Amazon: an environmental challenge; Projetos de petroleo e gas na Amazonia: um desafio ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Taam, Mauricio [Agencia Nacional do Petroleo, Gas Natural e Biocombustiveis (ANP), Rio de Janeiro, RJ (Brazil); Cabral, Nelson [PETROBRAS, Rio de Janeiro, RJ (Brazil). Regional Norte SMS ; Cardoso, Vanderlei [TRANSPETRO, Rio de Janeiro, RJ (Brazil). Gerencia de Seguranca, Meio Ambiente e Saude

    2004-07-01

    In the heart of the Amazon forest, some 600 km from the city of Manaus, the Brazilian Oil Company - PETROBRAS - is developing the 'URUCU PROJECT'. Consisting on 3 oil and gas production fields and 3 natural gas processing plant, 2 huge pipelines crossing the dense Amazon forest and its rivers and going towards COARI - the Fluvial Terminal of Solimoes river. Then, vessels and ferries, loads LGN to the north region and oil to feed the Manaus refinery plant. In a near future natural gas pipelines will connect COARI to Manaus and URUCU to Porto Velho. The whole project will allow energy supply to the less developed and isolated region of Brazil, and brings relief for the local population, but represents one of the biggest challenges for the oil and gas industry in terms of environmental sustainability for projects in very sensitive areas. The paper concludes that it is viable to face such a challenges counting on an Environmental Management System tailored to fit the region peculiarities, including a high level of Preparedness and Response for oil incidents, and last but never least assuming a respectful attitude towards the Amazon and its people. (author)

  15. A fully coupled finite element model for stress distribution in buried gas pipeline

    International Nuclear Information System (INIS)

    Yahya Sukirman; Zainal Zakaria; Woong Soon Yue

    2001-01-01

    The study of stress-strain relationship is very important in many designs of buried structures over the years. The behavior and mechanism between the interaction of soil and buried structures such as a natural pipeline will mostly contributes to the integrity of the pipeline. This paper presents a fully coupled finite element of consolidation analysis model to study the stress-strain distribution along a buried pipeline before it excess its maximum deformation limit. The behavior of the soil-pipeline system can be modelled by a non-linear elasto-plastic based on Mohr-Coulomb and critical state yield surfaces. The deformation and deflection of the pipeline due to drained and external loading condition will be considered here. Finally the stress-strain distribution of the buried pipeline will be utilised to obtain the maximum deformation limit and the deflection of the buried pipeline. (Author)

  16. GMAW (Gas Metal Arc Welding) process development for girth welding of high strength pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Rajan, Vaidyanath; Daniel, Joe; Quintana, Marie [The Lincoln Electric Company, Cleveland, OH (United States); Chen, Yaoshan [Center for Reliable Energy Systems (CRES), Dublin, OH (United States); Souza, Antonio [Lincoln Electric do Brasil, Guarulhos, SP (Brazil)

    2009-07-01

    This paper highlights some of the results and findings from the first phase of a consolidated program co-funded by US Department of Transportation Pipeline and Hazardous Materials Safety Administration (PHMSA) and Pipeline Research Council Inc (PRCI) to develop pipe weld assessment and qualification methods and optimize X 100 pipe welding technologies. One objective of the program is to establish the range of viable welding options for X 100 line pipe, and define the essential variables to provide welding process control for reliable and consistent mechanical performance of the weldments. In this first phase, a series of narrow gap girth welds were made with pulsed gas metal arc welding (GMAW), instrumented with thermocouples in the heat affected zone (HAZ) and weld metal to obtain the associated thermal profiles, and instrumented to measure true energy input as opposed to conventional heat input. Results reveal that true heat input is 16%-22% higher than conventional heat input. The thermal profile measurements correlate very well with thermal model predictions using true energy input data, which indicates the viability of treating the latter as an essential variable. Ongoing microstructural and mechanical testing work will enable validation of an integrated thermal-microstructural model being developed for these applications. Outputs from this model will be used to correlate essential welding process variables with weld microstructure and hardness. This will ultimately enable development of a list of essential variables and the ranges needed to ensure mechanical properties are achieved in practice, recommendations for controlling and monitoring these essential variables and test methods suitable for classification of welding consumables. (author)

  17. North America pipeline map

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    This map presents details of pipelines currently in place throughout North America. Fifty-nine natural gas pipelines are presented, as well as 16 oil pipelines. The map also identifies six proposed natural gas pipelines. Major cities, roads and highways are included as well as state and provincial boundaries. The National Petroleum Reserve is identified, as well as the Arctic National Wildlife Refuge. The following companies placed advertisements on the map with details of the services they provide relating to pipeline management and construction: Ferus Gas Industries Trust; Proline; SulfaTreat Direct Oxidation; and TransGas. 1 map

  18. Decision 99-13: Crestar Energy Inc. applications to construct and operate sour gas batteries and pipelines, Vulcan Field

    International Nuclear Information System (INIS)

    1999-06-01

    On 1 December 1998, the applicant applied pursuant to Part 4 of the Pipeline Act and Section 7.001 of the Oil and Gas Conservation Regulations for approval to construct and operate a sour gas pipeline and various surface facilities to tie in three wells. These are located at Legal Subdivision 12 of Section 36, Township 16, Range 24, West of the fourth Meridian (12-36 facility), Lsd 10-35-16-24 WM4 (10-35 facility), and Lsd 7-26-16-24 WM4 (7-26 facility), to an existing pipeline and proposed surface facility at Lsd 16-16-16-24 WM4. The 10-35, 7-26 and 16-16 facilities would each have a separator, a flare knockout drum, and a flare stack. The 12-36 facility would have two separators, one for each of the two producing zones at the 12-36 facility, a flare knockout drum, and flare stack. A compressor would be installed at the 16-16 facility. All fluids would be measured and re-injected into the pipeline for removal at the 16-16 facility. All proposed flare stacks would consists of a continuously burning sweet gas pilot and would be used for emergencies, routine well servicing, and pigging operations only. The pipeline would be designated as a Level 1 facility, and would transport up to 18 moles of hydrogen sulfide per kilomole of natural gas. Although the Board approved Application No. 1037084 after carefully considering the evidence, subject to meeting all the regulatory requirements and conditions set out in Attachment 1, it rejected Application No. 1033453

  19. Commentary on CSA Standard Z662-99, oil and gas pipeline systems : Special Publication Z622.1-01

    Energy Technology Data Exchange (ETDEWEB)

    Kalra, S; Burford, G; Adragna, M; Coyle, S; Hawryn, S; Martin, A; McConnell, J [eds.; Kumaralagan, I; Hassan, H

    2001-04-01

    CSA Standard Z662 presents the requirements for oil and gas pipeline systems and describes what has been accepted as good safety practice. This special publication is not part of the Standard and has not been formally reviewed by the Technical Committee responsible for the Standard, therefore it does not provide formal interpretations of the Standard. This special publication should be considered as an informal annotation of portions of the Standard. This paper presents background information regarding certain clauses and requirements in the Standard. Revisions to this first edition of CSA Special Publication Z662.1 are likely to be made whenever new information needs to be released. This publication discussed some of the standards for oil and gas pipelines in terms of design, materials, installation, joining, pressure testing, corrosion control, as well as operation, maintenance and upgrading. The report also referred to offshore gas and oil distribution systems including steel, plastic and aluminum piping. refs., figs.

  20. The use of the natural-gas pipeline infrastructure for hydrogen transport in a changing market structure

    International Nuclear Information System (INIS)

    Haeseldonckx, Dries; D'haeseleer, William

    2007-01-01

    In this paper, the transport and distribution aspects of hydrogen during the transition period towards a possible full-blown hydrogen economy are carefully looked at. Firstly, the energetic and material aspects of hydrogen transport through the existing natural-gas (NG) pipeline infrastructure is discussed. Hereby, only the use of centrifugal compressors and the short-term security of supply seem to constitute a problem for the NG to hydrogen transition. Subsequently, the possibility of percentwise mixing of hydrogen into the NG bulk is dealt with. Mixtures containing up to 17 vol% of hydrogen should not cause difficulties. As soon as more hydrogen is injected, replacement of end-use applications and some pipelines will be necessary. Finally, the transition towards full-blown hydrogen transport in (previously carrying) NG pipelines is treated. Some policy guidelines are offered, both in a regulated and a liberalised energy (gas) market. As a conclusion, it can be stated that the use of hydrogen-natural gas mixtures seems well suited for the transition from natural gas to hydrogen on a distribution (low pressure) level. However, getting the hydrogen gas to the distribution grid, by means of the transport grid, remains a major issue. In the end, the structure of the market, regulated or liberalised, turns out not to be important. (author)

  1. A quantitative analysis of the cost-effectiveness of project types in the CDM pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Green, Gavin A.

    2008-09-15

    The flexibility of the CDM is intended to reduce the cost of compliance for Annex 1 countries and contribute to cost-effective reductions. This paper provides a framework for defining cost-effective payments for CDM carbon reductions. The projects in the CDM pipeline are categorised into project types. The data provided in the Project Design Documents is quantitatively assessed to calculate the median cost and range of costs for producing a CER from the project categories. These are measured against the range of prices in the market in order to estimate the level of cost-effectiveness. Global warming potential and size of the project were shown to be key factors in the cost of producing a CER. The results show that although prices for CERs are difficult to define in the primary CER market, many of the project categories generated CERs at a cost well below the lowest market price. The difference in these two values is defined as a loss in cost-effectiveness. The CDM is shown to be successful at developing the 'lowest hanging fruit' but the mechanism could be improved to fulfil the goal of cost-effectiveness by linking the price per CER to the cost of generating a CER. (au)

  2. Hot gas cleaning, a targeted project

    Energy Technology Data Exchange (ETDEWEB)

    Romey, I. [University of Essen, Essen (Germany)

    1998-11-01

    Advanced hot gas cleaning systems will play a key role in future integrated combined cycle technologies. IGCC demonstration plants in operation or under construction are at present equipped with conventional wet gas scrubbing and cleaning systems. Feasibility studies for those IGCC plants have shown that the total efficiency of the processes can be improved using hot gas cleaning systems. However, this technology has not been developed and tested at a technical scale. Six well-known European industrial companies and research centres jointly worked together since January 1996 on a Targeted Project `Hot Gas Cleaning` to investigate and develop new hot gas cleaning systems for advanced clean coal power generation processes. In addition project work on chemical analysis and modelling was carried out in universities in England and Germany. The latest main findings were presented at the workshop. The main project aims are summarised as follows: to increase efficiency of advanced power generation processes; to obtain a reduction of alkalis and environmental emissions e.g. SO{sub 2}, NO{sub x}, CO{sub 2} and dust; and to develop the design basis for future industrial plants based on long-term operation of laboratory, pilot and demo-plants. To cover a range of possible process routes for future hot gas cleaning systems the following research programme is under investigation: removal of trace elements by different commercial and self developed sorbents; gas separation by membranes; separation of gas turbine relevant pollutants by hot filter dust and; H{sub 2}S removal and gas dedusting at high temperatures. 13 figs.

  3. Carbon dioxide corrosion: Modelling and experimental work applied to natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    P, Loldrup Fosboel

    2007-10-15

    CO{sub 2} corrosion is a general problem in the industry and it is expensive. The focus of this study is an oil gas production related problem. CO{sub 2} corrosion is observed in offshore natural gas transportation pipelines. A general overview of the problem is presented in chapter 1. The chemical system consists mainly of CO{sub 2}-Na{sub 2}CO{sub 3}-NaHCO{sub 3}-MEG-H{sub 2}O. Sodium is injected in the pipelines as NaOH in order to pH-stabilize the pipeline to avoid corrosion and MEG is injected in order to prevent gas hydrates. There are a great number of models available in the literature which may predict CO{sub 2} corrosion. These models are not very accurate and assume ideality in the main part of the equation. This thesis deals with aspect of improving the models to account for the non-ideality. A general overview and extension of the theory behind electrochemical corrosion is presented in chapter 2 to 4. The theory deals with the basic thermodynamics of electrolytes in chapter 2, the extension and general description of electrolyte mass transport in chapter 3, and the electrochemical kinetics of corrosion in chapter 4. A literature overview of CO{sub 2} corrosion is shown in chapter 5 and possible extensions of the models are discussed. A list of literature cites is given in chapter 6. The literature review in chapter 5 shows how FeCO{sub 3} plays a main part in the protection of steel. Especially the solubility of FeCO{sub 3} is an important factor. Chapter 7 discusses and validates the thermodynamic properties of FeCO{sub 3}. The study shows that there is a discrepancy in the properties of FeCO{sub 3}. Sets of consistent thermodynamic properties of FeCO{sub 3} are given. A mixed solvent electrolyte model is regressed in chapter 8 for the CO{sub 2}-Na{sub 2}CO{sub 3}-NaHCO{sub 3}-MEG-H{sub 2}O system. Parameters of the extended UNIQUAC model is fitted to literature data of VLE, SLE, heat excess and validated against heat capacity data. The model is also

  4. Italmontaggi builds expertise Conquering monsoons, adverse conditions Bangladesh pipelines

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    Bangladesh natural gas pipeline projects have become a specialty for Italmontaggi Pte Ltd., Singapore-based gas pipeline contractor and engineering organization. The firm's latest project is a 35-mile, 24-in. gas pipeline, branching from the Bakhrabad-Chittagong main gas pipeline to the city gate station at Demra, near the capital city of Dacca. Gas is delivered to the Titas gas distribution system. The 35-mile turnkey project, valued at $25 million, included design, procurement, construction, and commissioning. A small pipeline was in existence from the Titas gas field to Dacca, but increased demand caused acute power shortages in the capital city's industrial areas. The new gas line will alleviate that problem. That project is a followup to Italmontaggi's successful completion of the major 108-mile, 24-in. main gas pipeline between the Bakhrabad gas fields, outside Dhaha, to the country's principal port and industrial center at Chittagong. Italmontaggi also installed 22 miles of ring main for the Chittagong gas distribution system. That included 12 miles of 24-in. and 10 miles of 16- and 20-in. to provide connections to industrial customers. Bangladesh lines difficult. The $45million contract for the Bakhrabad-toChittagong pipeline to Italmlontaggi, an autonomous offshoot of the Italian firm, resulted in a constant battle against hostile ground conditions, difficult access, and rapidly changing weather conditions. October-to- April is the dry season and Mayto-September is the wet season in this region. To keep the project moving, Italmontaggi developed two independent techniques for ground preparation during the wet season, and a pipelaying technique for the dry season. The new gas pipeline provides a major saving to the Bangladesh national economy as industries convert from oil to gas. Predicted savings are for more than $100 million in energy costs.

  5. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Final EIR/EIS

    International Nuclear Information System (INIS)

    1994-01-01

    On May 26, 1994, the Lake County Sanitation District and the US Bureau of Land Management released for public review a Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) on the proposed Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. A minimum 45-day review and comment period began on that date and notices were published in the Federal Register. The public review and comment period closed on July 26, 1994. Public hearings on the Draft EIMIS were held in Lakeport, CA, on June 30 and July 14, 1994. The first part of this document contains copies of the written comments submitted on the Draft EIR/EIS. It also contains summary paraphrased comments of the public hearings. The second part of this document contains responses to the comments

  6. Improvement of Regulatory Requirements for Ensuring the Quality of Underground Gas Pipelines in Conditions of Corrosion Fatigue

    Directory of Open Access Journals (Sweden)

    Larysa Yuzevych

    2017-09-01

    Full Text Available The article develops recommendations for improvement of normative documents concerning the quality of underground metal pipelines (gas pipelines under conditions of fatigue and the impact of an aggressive environment, taking into account cathodic (electrochemical protection. It is established that the basis of information provision of normative documents is the method which includes the following main criteria: the value of the minimum current density of cathode protection; minimum security potential; maximum protective potential, minimal displacement of protective potential; strength criteria of pipe material; criteria of strength of phase layer between the metal and the coating; the strength of the metal in the defect of the insulation coating. It has been found out that the system "metal pipe - insulating dielectric coating" is characterized by such basic procedures as: identification of hazards; various variants of load asymmetry; evaluation of the boundary and optimal values of potentials and currents for the system of cathodic protection of the pipeline. The prospect of further research in this area is determination of the complex indicator of quality and reliability of the linear part of underground main gas pipelines on the basis of research results (submitted information support.

  7. Risk assessment by integrating interpretive structural modeling and Bayesian network, case of offshore pipeline project

    International Nuclear Information System (INIS)

    Wu, Wei-Shing; Yang, Chen-Feng; Chang, Jung-Chuan; Château, Pierre-Alexandre; Chang, Yang-Chi

    2015-01-01

    The sound development of marine resource usage relies on a strong maritime engineering industry. The perilous marine environment poses the highest risk to all maritime work. It is therefore imperative to reduce the risk associated with maritime work by using some analytical methods other than engineering techniques. This study addresses this issue by using an integrated interpretive structure modeling (ISM) and Bayesian network (BN) approach in a risk assessment context. Mitigating or managing maritime risk relies primarily on domain expert experience and knowledge. ISM can be used to incorporate expert knowledge in a systematic manner and helps to impose order and direction on complex relationships that exist among system elements. Working with experts, this research used ISM to clearly specify an engineering risk factor relationship represented by a cause–effect diagram, which forms the structure of the BN. The expert subjective judgments were further transformed into a prior and conditional probability set to be embedded in the BN. We used the BN to evaluate the risks of two offshore pipeline projects in Taiwan. The results indicated that the BN can provide explicit risk information to support better project management. - Highlights: • We adopt an integrated method for risk assessment of offshore pipeline projects. • We conduct semi-structural interview with the experts for risk factor identification. • Interpretive structural modeling helps to form the digraph of Bayesian network (BN) • We perform the risk analysis with the experts by building a BN. • Risk evaluations of two case studies using the BN show effectiveness of the methods

  8. Mechanical properties of steel for construction of gas transfer pipelines and their modification resulting from expanding of gas pipelines during hydraulic pressure testing; Wlasnosci mechaniczne stali do budowy rurociagow przesylowych gazu i ich modyfikacja w wyniku eksploatowania rurociagow gazu w trakcie hydraulicznej proby cisnieniowej

    Energy Technology Data Exchange (ETDEWEB)

    Kopczynski, A [Biuro Studiow i Projektow Gornictwa, Gazoprojekt S.A., Wroclaw (Poland)

    1997-07-01

    There are discussed the mechanical properties of the new generation of steel as per European Standard EN 10208.2: 1996. on the basis of the mechanical parameters of steel the normalized graphs of steel tensioning are presented. Analysis of influence of expanding gas pipelines on changes of steel tensioning graphs were performed. Advantages, resulting from expanding of gas pipelines, were shown. (author)

  9. An analysis of land use planning and equity issues surrounding hazardous liquid and natural gas transmission pipelines in North Carolina

    Science.gov (United States)

    Osland, Anna Christine

    Hazardous liquid and natural gas transmission pipelines have received limited attention by planning scholars even though local development decisions can have broad consequences if a rupture occurs. In this dissertation, I evaluated the implications of land-use planning for reducing risk to transmission pipeline hazards in North Carolina via three investigations. First, using a survey of planning directors in jurisdictions with transmission pipeline hazards, I investigated the land use planning tools used to mitigate pipeline hazards and the factors associated with tool adoption. Planning scholars have documented the difficulty of inducing planning in hazardous areas, yet there remain gaps in knowledge about the factors associated with tool adoption. Despite the risks associated with pipeline ruptures, I found most localities use few mitigation tools, and the adoption of regulatory and informational tools appear to be influenced by divergent factors. Whereas risk perception, commitment, capacity, and community context were associated with total tool and information tool use, only risk perception and capacity factors were associated with regulatory tool use. Second, using interviews of emergency managers and planning directors, I examined the role of agency collaboration for building mitigation capacity. Scholars have highlighted the potential of technical collaboration, yet less research has investigated how inter-agency collaboration shapes mitigation capacity. I identify three categories of technical collaboration, discuss how collaborative spillovers can occur from one planning area to another, and challenge the notion that all technical collaborations result in equal mitigation outcomes. Third, I evaluated characteristics of the population near pipelines to address equity concerns. Surprisingly, I did not find broad support for differences in exposure of vulnerable populations. Nonetheless, my analyses uncovered statistically significant clusters of vulnerable

  10. ASSESSMENT OF DIVERSITY OF POLISH VOIVODSHIPS BY LEVEL OF GAS PIPELINE INFRASTRUCTURE DEVELOPMENT USING MULTIDIMENSIONAL COMPARATIVE ANALYSIS

    Directory of Open Access Journals (Sweden)

    Marek URBANIK

    2016-06-01

    Full Text Available In the paper differentiation of gas pipeline infrastructure development in the Polish voivodships was presented. To illustrate this diversity the method of cluster analysis is used, obtained on the basis of statistical data collected by the Central Statistical Office (CSO. In order to conduct a preliminary review procedure for classification of individual provinces in relation to the assessment of the development of gas pipeline infrastructure linear classification was used, involved determining synthetic measure, which is the average of the variable components, through which voivodships were ordered. In order to estimate the distance between the clusters the variance analysis was used with the implementation of the Ward method. The analysis was performed on the basis of the following indicators: average increase in length of the gas network (an average for the total voivodoship 164.2 km, growth of the gas network in comparison to the first year of observation (123%, number of gas connections per 1 km of gas pipe (18.87 no∙km-1, the length of the network per unit area (5.37 m∙ha-1, intensity of network loading (84.15 m3∙d-1∙km-1, inhabitants having access to the gas system in % of total population (51.33%. In the analysis five clusters were grouped. Critical value was determined and segregation of individual clusters was made, taking into account the dominant parameters.

  11. Security of pipeline facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.C. [Alberta Energy and Utilities Board, Calgary, AB (Canada); Van Egmond, C.; Duquette, L. [National Energy Board, Calgary, AB (Canada); Revie, W. [Canada Centre for Mineral and Energy Technology, Ottawa, ON (Canada)

    2005-07-01

    This working group provided an update on provincial, federal and industry directions regarding the security of pipeline facilities. The decision to include security issues in the NEB Act was discussed as well as the Pipeline Security Management Assessment Project, which was created to establish a better understanding of existing security management programs as well as to assist the NEB in the development and implementation of security management regulations and initiatives. Amendments to the NEB were also discussed. Areas of pipeline security management assessment include physical safety management; cyber and information security management; and personnel security. Security management regulations were discussed, as well as implementation policies. Details of the Enbridge Liquids Pipelines Security Plan were examined. It was noted that the plan incorporates flexibility for operations and is integrated with Emergency Response and Crisis Management. Asset characterization and vulnerability assessments were discussed, as well as security and terrorist threats. It was noted that corporate security threat assessment and auditing are based on threat information from the United States intelligence community. It was concluded that the oil and gas industry is a leader in security in North America. The Trans Alaska Pipeline Incident was discussed as a reminder of how costly accidents can be. Issues of concern for the future included geographic and climate issues. It was concluded that limited resources are an ongoing concern, and that the regulatory environment is becoming increasingly prescriptive. Other concerns included the threat of not taking international terrorism seriously, and open media reporting of vulnerability of critical assets, including maps. tabs., figs.

  12. Reasons for decision in the matter of Enbridge Pipelines Inc. Line 4 Extension Project : facilities[Application dated 28 June 2007 for the Line 4 Extension Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    In June 2007, Enbridge Pipelines Inc. applied for approval to extend Line 4 of its Mainline pipeline upstream from Hardisty to Edmonton, Alberta. The project would relieve a potential bottleneck and would also add an additional line across this segment to increase system security and flexibility. The average annual capacity of Line 4 would be 140,000 cubic metres per day. The Enbridge Mainline from Edmonton to Hardisty currently includes 3 oil pipelines, while the Enbridge Mainline downstream of Hardisty includes 4 oil pipelines. This document presented the views of the Board regarding the construction and operation of the project facilities; public and Aboriginal consultation; environmental and socio-economic matters; land matters; tolls and tariffs; and, supply, markets, financing and economics. The Board noted that the benefits of this project outweigh the burdens associated with it. The project required an environmental assessment under the Canadian Environmental Assessment Act which found that it is not likely to cause significant adverse environmental effects. In its approval of the project, the Board attached 15 conditions, including a requirement for Enbridge to file an updated Environmental Protection Plan for the Board's approval. The Board also approved Enbridge's application for its tolling method and to reactivate 3 sections of pre-existing pipeline. 3 tabs., 3 figs., 3 appendices.

  13. 3D finite element modeling of in-service sleeve repair welding of gas pipelines

    International Nuclear Information System (INIS)

    Alian, Ahmed R.; Shazly, Mostafa; Megahed, Mohammad M.

    2016-01-01

    The present work investigates the influence of welding sequence and scheme on residual stresses induced during in-service sleeve repair welding of gas pipelines. For this purpose, a 3D thermo-mechanical FE analysis is conducted on an 8″-Schedule-20, API 5L-X65 steel pipe. Two welding sequences for the sleeve-pipe circumferential fillet welds are compared in the present study: sequential welding in which one side of the sleeve is welded first and then the other side is welded by the same welder, and simultaneous welding in which both sides of the sleeve are welded concurrently by two welders. Within the simultaneous welding sequence, four different welding schemes, designed to investigate the influence of the number of welders and welding directions on residual stresses, are investigated. The results show that the sequential welding sequence induces less residual stresses and distortions. Within the simultaneous welding sequence, the back-step welding scheme is found to induce the least average residual stresses as compared to other welding schemes. - Highlights: • We model in-service sleeve repair welding using 3D FE. • Model was validated through comparison with existing experimental results. • The study presents results on the effect of both welding sequence and welding scheme on the resulting residual stresses. • Sequential welding sequence generates lower residual stresses than simultaneous welding sequence. • Back-step welding scheme generates the lowest average residual stresses along the pipe circumference.

  14. On the comparison of different multiphase flow kernels for gas pipeline real time advanced functions

    Energy Technology Data Exchange (ETDEWEB)

    Baptista, Renan Martins; Barbosa Figueiredo, Aline; Bodstein, Gustavo C. R. [Federal University of Rio de Janeiro - UFRJ, Rio de Janeiro, (Brazil)

    2010-07-01

    Two-fluid models identify and treat phases independently. These models could be useful for developing high performance tools for leak detection, location and quantification. This paper reports the development of a simplified two-fluid model called SPM-4. Different computer methods were tested (Richtmyer, Force, FCT, TVD/LAX, Rusanov), from first orde centered schemes up to second order characteristics-based schemes. A theoretical scenario was created based on on-field data. A typical two-phase gas pipeline was defined as a test scenario for comparing the simplified two-phase flow simulator based on SPM-4 with the latest version of OLGA, a commercial computerized flow simulator. Also the different selected computer methods for SPM-4 were compared to each other and with the OLGA 2PM-6 models as reference. The final results showed the Richtmyer and FCT are the most consistent methods in terms of accuracy and CPU performance when compared to the benchmark 2PM-6.

  15. Patterns identification in supervisory systems of nuclear reactors installations and gas pipelines systems using self-organizing maps

    International Nuclear Information System (INIS)

    Doraskevicius Junior, Waldemar

    2005-01-01

    Self-Organizing Maps, SOM, of Kohonen were studied, implemented and tested with the aim of developing, for the energy branch, an effective tool especially for transient identification in nuclear reactors and for gas pipelines networks logistic supervision, by classifying operations and identifying transients or abnormalities. The digital system for the test was developed in Java platform, for the portability and scalability, and for belonging to free development platforms. The system, executed in personal computers, showed satisfactory results to aid in decision taking, by classifying IRIS (International Reactor Innovative and Secure) reactor operation conditions (data from simulator) and by classifying Southeast (owner: TRANSPETRO - Brazil) gas pipeline network. Various adaptations were needed for such business, as new topologies for the output layer of artificial neural network and particular preparation for the input data. (author)

  16. Environmental management programs of the Bolivia-Brazil gas pipeline; Programa de gestao ambiental do gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Helio Joaquim dos [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    One of the largest South America's enterprises of energy integration of the Bolivia/Brazil gas pipeline in Brazilian side own and operated by TBG has interacted with 05 states, 137 districts and 06 environment governmental entities (IBAMA and States' department) of environment multilateral financial institutions and group of ten of other governmental and not governmental organizations. The level of approved investment was of the order of 1,5 billion dollars, of which about 29 million had been destined the ambient activities. Thus, without precedents in Brazil this work presents the plan of ambient management of the enterprise, created to develop and implement the ambient programs during the construction and operation of the gas pipeline stage. The work here presented will give prominence to the programs of ambient compensation and social communication inside Brazil. (author)

  17. Environmental management programs of the Bolivia-Brazil gas pipeline; Programa de gestao ambiental do gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Helio Joaquim dos [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    One of the largest South America's enterprises of energy integration of the Bolivia/Brazil gas pipeline in Brazilian side own and operated by TBG has interacted with 05 states, 137 districts and 06 environment governmental entities (IBAMA and States' department) of environment multilateral financial institutions and group of ten of other governmental and not governmental organizations. The level of approved investment was of the order of 1,5 billion dollars, of which about 29 million had been destined the ambient activities. Thus, without precedents in Brazil this work presents the plan of ambient management of the enterprise, created to develop and implement the ambient programs during the construction and operation of the gas pipeline stage. The work here presented will give prominence to the programs of ambient compensation and social communication inside Brazil. (author)

  18. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    Science.gov (United States)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  19. Detecting Methane From Leaking Pipelines and as Greenhouse Gas in the Atmosphere

    Science.gov (United States)

    Riris, Haris; Numata, Kenji; Li, Steven; Wu, Stewart; Ramanathan, Anand; Dawsey, Martha

    2012-01-01

    Laser remote sensing measurements of trace gases from orbit can provide unprecedented information about important planetary science and answer critical questions about planetary atmospheres. Methane (CH4) is the second most important anthropogenically produced greenhouse gas. Though its atmospheric abundance is much less than that of CO2 (1.78 ppm vs. 380 ppm), it has much larger greenhouse heating potential. CH4 also contributes to pollution in the lower atmosphere through chemical reactions, leading to ozone production. Atmospheric CH4 concentrations have been increasing as a result of increased fossil fuel production, rice farming, livestock, and landfills. Natural sources of CH4 include wetlands, wild fires, and termites, and perhaps other unknown sources. Important sinks for CH4 include non-saturated soils and oxidation by hydroxyl radicals in the atmosphere. Remotely measuring CH4 and other biogenic molecules (such as ethane and formaldehyde) on Mars also has important implications on the existence of life on Mars. Measuring CH4 at very low (ppb) concentrations from orbit will dramatically improve the sensitivity and spatial resolution in the search for CH4 vents and sub-surface life on other planets. A capability has been developed using lasers and spectroscopic detection techniques for the remote measurements of trace gases in open paths. Detection of CH4, CO2, H2O, and CO in absorption cells and in open paths, both in the mid- IR and near-IR region, has been demonstrated using an Optical Parametric Amplifier laser transmitter developed at GSFC. With this transmitter, it would be possible to develop a remote sensing methane instrument. CH4 detection also has very important commercial applications. Pipeline leak detection from an aircraft or a helicopter can significantly reduce cost, response time, and pinpoint the location. The main advantage is the ability to rapidly detect CH4 leaks remotely. This is extremely important for the petrochemical industry

  20. Non-invasive and non-intrusive gas flow measurement based on the dynamic thermal characteristics of a pipeline

    Science.gov (United States)

    Fan, Zichuan; Cai, Maolin; Xu, Weiqing

    2012-10-01

    This paper proposes a non-intrusive and non-invasive method for measuring the gas flow rate in pneumatic industry. A heater unit is fixed on the partial circumference of the external wall of a pipeline and emits specific thermal pulses in a predetermined mode. Two sensors attached to the external wall detect the upstream temperature, and the gas flow can be measured according to the relationship between the flow rate and the dynamic thermal characteristics of the pipeline. To determine the preferable relationship, the temperature field model of the measurement system is built. Then, based on the measurement modes and the corresponding simulations, the objective functions for the gas flow specified on different dynamic thermal characteristics are established. Additionally, the minimum measurement time of the method, named reference time scale, is proposed. Further, robustness tests of the measurement method are derived by considering the influences of multiple factors on the objective functions. The experiments confirm that this method does not need to open the pipeline and disturb the flow regime in order to obtain the data; this method also avoids the typical time-consuming and complex operations, resists ambient temperature disturbance and achieves approximately acceptable results.

  1. Non-invasive and non-intrusive gas flow measurement based on the dynamic thermal characteristics of a pipeline

    International Nuclear Information System (INIS)

    Fan, Zichuan; Cai, Maolin; Xu, Weiqing

    2012-01-01

    This paper proposes a non-intrusive and non-invasive method for measuring the gas flow rate in pneumatic industry. A heater unit is fixed on the partial circumference of the external wall of a pipeline and emits specific thermal pulses in a predetermined mode. Two sensors attached to the external wall detect the upstream temperature, and the gas flow can be measured according to the relationship between the flow rate and the dynamic thermal characteristics of the pipeline. To determine the preferable relationship, the temperature field model of the measurement system is built. Then, based on the measurement modes and the corresponding simulations, the objective functions for the gas flow specified on different dynamic thermal characteristics are established. Additionally, the minimum measurement time of the method, named reference time scale, is proposed. Further, robustness tests of the measurement method are derived by considering the influences of multiple factors on the objective functions. The experiments confirm that this method does not need to open the pipeline and disturb the flow regime in order to obtain the data; this method also avoids the typical time-consuming and complex operations, resists ambient temperature disturbance and achieves approximately acceptable results. (paper)

  2. World pipeline work set for rapid growth

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports on international pipeline construction which has entered a fast-growth period, accelerated by the new political and economic realities around the world and increasing demand for natural gas, crude oil and refined petroleum products. Many projects are under way or in planning for completion in the mid- to late 1990s in Europe, South America, Asia and the Middle East. Pipeline And Gas Journal's projection calls for construction or other work on 30,700 miles of new natural gas, crude oil and refined products pipelines in the 1992-93 period outside Canada and the U.S. These projects will cost an estimated $30 billion-plus. Natural gas pipelines will comprise most of the mileage, accounting for almost 23,000 miles at an estimated cost of $26.3 billion. Products pipelines, planned or under construction, will add another 5,800 miles at a cost of $2.8 billion. Crude oil pipelines, at a minimum, will total 1,900 new miles at a cost of slightly under $1 billion

  3. Design and analysis of FBG based sensor for detection of damage in oil and gas pipelines for safety of marine life

    Science.gov (United States)

    Bedi, Amna; Kothari, Vaishali; Kumar, Santosh

    2018-02-01

    The under laid gas and oil pipelines on the seafloor are prone to various disturbances like seismic movements of the sea bed, oceanic currents, tsunamis. These factors tend to damage such pipelines connecting different locations of the world dependent on these pipelines for their day-to-day use of oil and natural gas. If damaged, the oil spills in the water bodies cause grave loss to marine life along with serious economic issues. It is not feasible to monitor the undersea pipelines manually because of the huge seafloor depth. For timely detection of such damage, a new technique using optical Fiber Bragg grating (FBG) sensors and its installation has been given in this work. The idea of an FBG sensor for detecting damage in pipeline structure based on the acoustic emission has been worked out. The numerical calculation has been done based on the fundamental of strain measurement and the output has been simulated using MATLAB.

  4. Vulnerability assessment of critical infrastructure : activity 2 progress report : information of SCADA systems and other security monitoring systems used in oil and gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gu, G.P. [Natural Resources Canada, Ottawa, ON (Canada). CANMET Materials Technology Laboratory

    2007-12-15

    Many pipelines are located in remote regions and subjected to harsh environmental conditions. Damage to pipelines can have significant economic and environmental impacts. This paper discussed the use of supervisory control and data acquisition (SCADA) systems to monitor and control oil and gas pipeline infrastructure. SCADA systems are a real time, distributed computerized system with an intelligent capability for condition identification and fault diagnosis. SCADA systems can be used to capture thousands of miles of pipeline system process data and distribute it to pipeline operators, whose work stations are networked with the SCADA central host computer. SCADA architectures include monolithic, distributed, and networked systems that can be distributed across wide area networks (WANs). SCADA security strategies must be implemented to ensure corporate network security. Case studies of SCADA systems currently used by oil and gas operators in Alberta were also presented. 15 refs., 1 fig.

  5. 78 FR 41991 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Science.gov (United States)

    2013-07-12

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice; Issuance of Advisory... Gas and Hazardous Liquid Pipeline Systems. Subject: Potential for Damage to Pipeline Facilities Caused...

  6. Applications of UT results to confirm defects findings by utilization of relevant metallurgical investigations techniques on gas/condensate pipeline working in wet sour gas environment

    Science.gov (United States)

    El-Azhari, O. A.; Gajam, S. Y.

    2015-03-01

    The gas/condensate pipe line under investigation is a 12 inch diameter, 48 km ASTM, A106 steel pipeline, carrying hydrocarbons containing wet CO2 and H2S.The pipe line had exploded in a region 100m distance from its terminal; after 24 years of service. Hydrogen induced cracking (HIC) and sour gas corrosion were expected due to the presence of wet H2S in the gas analysis. In other areas of pipe line ultrasonic testing was performed to determine whether the pipeline can be re-operated. The results have shown presence of internal planner defects, this was attributed to the existence of either laminations, type II inclusions or some service defects such as HIC and step wise cracking (SWC).Metallurgical investigations were conducted on fractured samples as per NACE standard (TM-0284-84). The obtained results had shown macroscopic cracks in the form of SWC, microstructure of steel had MnS inclusions. Crack sensitivity analyses were calculated and the microhardness testing was conducted. These results had confirmed that the line material was suffering from sour gas deteriorations. This paper correlates the field UT inspection findings with those methods investigated in the laboratory. Based on the results obtained a new HIC resistance material pipeline needs to be selected.

  7. GI-POP: a combinational annotation and genomic island prediction pipeline for ongoing microbial genome projects.

    Science.gov (United States)

    Lee, Chi-Ching; Chen, Yi-Ping Phoebe; Yao, Tzu-Jung; Ma, Cheng-Yu; Lo, Wei-Cheng; Lyu, Ping-Chiang; Tang, Chuan Yi

    2013-04-10

    Sequencing of microbial genomes is important because of microbial-carrying antibiotic and pathogenetic activities. However, even with the help of new assembling software, finishing a whole genome is a time-consuming task. In most bacteria, pathogenetic or antibiotic genes are carried in genomic islands. Therefore, a quick genomic island (GI) prediction method is useful for ongoing sequencing genomes. In this work, we built a Web server called GI-POP (http://gipop.life.nthu.edu.tw) which integrates a sequence assembling tool, a functional annotation pipeline, and a high-performance GI predicting module, in a support vector machine (SVM)-based method called genomic island genomic profile scanning (GI-GPS). The draft genomes of the ongoing genome projects in contigs or scaffolds can be submitted to our Web server, and it provides the functional annotation and highly probable GI-predicting results. GI-POP is a comprehensive annotation Web server designed for ongoing genome project analysis. Researchers can perform annotation and obtain pre-analytic information include possible GIs, coding/non-coding sequences and functional analysis from their draft genomes. This pre-analytic system can provide useful information for finishing a genome sequencing project. Copyright © 2012 Elsevier B.V. All rights reserved.

  8. 77 FR 51848 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-08-27

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Program for Gas Distribution Pipelines. DATES: Interested persons are invited to submit comments on or.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and...

  9. 77 FR 74275 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-12-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and... control room. Affected Public: Operators of both natural gas and hazardous liquid pipeline systems. Annual...

  10. 77 FR 27279 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-05-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  11. 78 FR 46560 - Pipeline Safety: Class Location Requirements

    Science.gov (United States)

    2013-08-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... class location requirements for gas transmission pipelines. Section 5 of the Pipeline Safety, Regulatory... and, with respect to gas transmission pipeline facilities, whether applying IMP requirements to...

  12. 75 FR 53733 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-09-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0246] Pipeline Safety: Information Collection Activities AGENCY: Pipeline and Hazardous... liquefied natural gas, hazardous liquid, and gas transmission pipeline systems operated by a company. The...

  13. 77 FR 46155 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-08-02

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  14. 77 FR 15453 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-03-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... information collection titled, ``Gas Pipeline Safety Program Certification and Hazardous Liquid Pipeline... collection request that PHMSA will be submitting to OMB for renewal titled, ``Gas Pipeline Safety Program...

  15. Hand calculation of safe separation distances between natural gas pipelines and boilers and nuclear facilities in the Hanford site 300 Area

    International Nuclear Information System (INIS)

    Daling, P.M.; Graham, T.M.

    1999-01-01

    The US Department of Energy has undertaken a project to reduce energy expenditures and improve energy system reliability in the 300 Area of the Hanford Site near Richland, Washington. This project replaced the centralized heating system with heating units for individual buildings or groups of buildings, constructed a new natural-gas distribution system to provide a fuel source for many of these units, and constructed a central control building to operate and maintain the system. The individual heating units include steam boilers that are housed in individual annex buildings located in the vicinity of a number of nuclear facilities operated by the Pacific Northwest National Laboratory (PNNL). The described analysis develops the basis for siting the package boilers and natural-gas distribution system used to supply steam to PNNL's 300 Area nuclear facilities. Minimum separation distances that would eliminate or reduce the risks of accidental dispersal of radioactive and hazardous materials in nearby nuclear facilities were calculated based on the effects of four potential fire and explosion (detonation) scenarios involving the boiler and natural-gas distribution system. These minimum separation distances were used to support siting decisions for the boilers and natural-gas pipelines

  16. Experimental study on a de-noising system for gas and oil pipelines based on an acoustic leak detection and location method

    International Nuclear Information System (INIS)

    Liu, Cuiwei; Li, Yuxing; Fang, Liping; Xu, Minghai

    2017-01-01

    To protect the pipelines from significant danger, the acoustic leak detection and location method for oil and gas pipelines is studied, and a de-noising system is established to extract leakage characteristics from signals. A test loop for gas and oil is established to carry out experiments. First, according to the measured signals, fitting leakage signals are obtained, and then, the objective signals are constructed by adding noises to the fitting signals. Based on the proposed evaluation indexes, the filtering methods are then applied to process the constructed signals and the de-noising system is established. The established leakage extraction system is validated and then applied to process signals measured in gas pipelines that include a straight pipe, elbow pipe and reducing pipe. The leak detection and location is carried out effectively. Finally, the system is applied to process signals measured in water pipelines. The results demonstrate that the proposed de-noising system is effective at extracting leakage signals from measured signals and that the proposed leak detection and location method has a higher detection sensitivity and localization accuracy. For a pipeline with an inner diameter of 42 mm, the smallest leakage orifice that can be detected is 0.1 mm for gas and water and the largest location error is 0.874% for gas and 0.176% for water. - Highlights: • Three evaluation indexes are proposed: SNR, RMSE and ALPD. • The de-noising system is established in the gas and oil pipelines. • The established system is used for gas pipeline effectively, including interference pipes. • The established de-noising system is used for water pipeline effectively.

  17. Sweden and the NEGP: A Pilot Study of the North European Gas Pipeline and Sweden's Dependence on Russian Energy

    Energy Technology Data Exchange (ETDEWEB)

    Larsson, Robert L

    2006-06-15

    Developments between 2004 and 2006 indicate that a North European Gas Pipeline (NEGP) through the Baltic Sea, from Russia to Germany, may be realised in the coming decade. This would provide Europe with yet another opportunity to diversify its import channels of gas. It is however reasonable to assume that the NEGP also could change the strategic pattern and be a source of friction. The NEGP may rock the regional stability and reduce the potential of the new EU members to become security providers in Europe's northern dimension. It also gives increased leverage and influence to Russia, a state that has moved in an authoritarian direction under President Putin. The aim of this pilot study is to elucidate on the NEGP pipeline and Sweden's increasing dependence on Russian energy. A subsidiary aim is to outline a set of concerns that have bearing on the situation for the EU and Baltic Sea Region and that need to be further addressed. In conclusion, the NEGP will enhance Russia's direct leverage on Poland, Ukraine, and Belarus, as it will allow Russia to turn off gas supplies without affecting exports to other parts of Europe. Russia will also increase its leverage over the states that will or may be connected to the NEGP (Germany, and possibly Belgium, Denmark, the Netherlands and the UK). Even if Sweden is not embracing the NEGP, it is today highly sensitive as it imports most of its energy. It is increasingly dependent on Russian oil and is partly dependent on imports of electricity from Russia. Should the NEGP materialise and Sweden becomes connected in the future, it would likely be dependent also on natural gas. It is of paramount importance for the energy security of the connected states how the pipeline is constructed and operated. If there will be technical possibilities for Russia to tamper with the flow of gas to individual states without affecting supply to others, there are tangible threats to the importing states.

  18. Sweden and the NEGP: A Pilot Study of the North European Gas Pipeline and Sweden's Dependence on Russian Energy

    International Nuclear Information System (INIS)

    Larsson, Robert L.

    2006-06-01

    Developments between 2004 and 2006 indicate that a North European Gas Pipeline (NEGP) through the Baltic Sea, from Russia to Germany, may be realised in the coming decade. This would provide Europe with yet another opportunity to diversify its import channels of gas. It is however reasonable to assume that the NEGP also could change the strategic pattern and be a source of friction. The NEGP may rock the regional stability and reduce the potential of the new EU members to become security providers in Europe's northern dimension. It also gives increased leverage and influence to Russia, a state that has moved in an authoritarian direction under President Putin. The aim of this pilot study is to elucidate on the NEGP pipeline and Sweden's increasing dependence on Russian energy. A subsidiary aim is to outline a set of concerns that have bearing on the situation for the EU and Baltic Sea Region and that need to be further addressed. In conclusion, the NEGP will enhance Russia's direct leverage on Poland, Ukraine, and Belarus, as it will allow Russia to turn off gas supplies without affecting exports to other parts of Europe. Russia will also increase its leverage over the states that will or may be connected to the NEGP (Germany, and possibly Belgium, Denmark, the Netherlands and the UK). Even if Sweden is not embracing the NEGP, it is today highly sensitive as it imports most of its energy. It is increasingly dependent on Russian oil and is partly dependent on imports of electricity from Russia. Should the NEGP materialise and Sweden becomes connected in the future, it would likely be dependent also on natural gas. It is of paramount importance for the energy security of the connected states how the pipeline is constructed and operated. If there will be technical possibilities for Russia to tamper with the flow of gas to individual states without affecting supply to others, there are tangible threats to the importing states

  19. Pipeline, utilities to spend $127 million on scada systems

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Spending for new or upgraded supervisory control and data acquisition (scada) systems and for additional remote-terminal units (RTUs) by North American pipelines and utilities will exceed $165 million through February 1996. New and updated scada systems will total 122 at a cost of more than $127 million; 143 RTU add-on projects will cost more than $38 million. Pipelines and combined utilities/pipelines will spend $89.5 million for 58 scada-system projects and $30.2 million for RTU add-on projects. Scada systems are computerized hardware and software systems that perform monitoring and control functions. In gas utilities, these systems perform functions normally associated with gas transmission and distribution as well as production-plant process control. In gas and oil pipelines, the systems perform these functions as well as such specialized functions as batch tracking, leak detection, and gas load flow

  20. Hot-Gas Filter Ash Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Swanson, M.L.; Hurley, J.P.; Dockter, B.A.; O`Keefe, C.A.

    1997-07-01

    Large-scale hot-gas filter testing over the past 10 years has revealed numerous cases of cake buildup on filter elements that has been difficult, if not impossible, to remove. At times, the cake can blind or bridge between candle filters, leading to filter failure. Physical factors, including particle-size distribution, particle shape, the aerodynamics of deposition, and system temperature, contribute to the difficulty in removing the cake, but chemical factors such as surface composition and gas-solid reactions also play roles in helping to bond the ash to the filters or to itself. This project is designed to perform the research necessary to determine the fuel-, sorbent-, and operations-related conditions that lead to blinding or bridging of hot-gas particle filters. The objectives of the project are threefold: (1) Determine the mechanisms by which a difficult-to-clean ash is formed and how it bridges hot-gas filters (2) Develop a method to determine the rate of bridging based on analyses of the feed coal and sorbent, filter properties, and system operating conditions and (3) Suggest and test ways to prevent filter bridging.