WorldWideScience

Sample records for gas line project

  1. A different challenge: the directional drilled crossing for the Yacuiba - Rio Grande Gas Line Project - GASYRG

    Energy Technology Data Exchange (ETDEWEB)

    Green, Wayne; Garcia, Francisco [Bolinter Ltda., Santa Cruz (Bolivia); Montano, Ruben [Transierra, Santa Cruz (Bolivia)

    2003-07-01

    The Rio Grande River's directional drilling, 2002 m. long and 25 m. deep was a great challenge for Transierra - Owner - as well as Laney - Bolinter - Contractor - to accomplish a feat yet to be done in the entire world. The dedication of the people involved showed their degree of professionalism that these companies have obtained and the determination in doing the job overcoming unforeseen obstacles and still being able to finish on time, mitigating environmental impacts and leaving a first class crossing. This document presents a description of the technical, logistic and construction factors that were involved in the project and which allowed to perform 7 directional drillings, including Rio Grande River, which during the pull got the last 60 m. of pipe stuck, being freed only after using a pneumatic hammer. (author)

  2. Financing landfill gas projects

    International Nuclear Information System (INIS)

    Bull, R.

    1992-01-01

    The problems of financing landfill gas projects in the UK in the last few years are discussed. The approach of the author in setting up a company to finance such projects in the power generation field and a separate company to design and supply turnkey packages is reported. (UK)

  3. Saving gas project

    Energy Technology Data Exchange (ETDEWEB)

    Vasques, Maria Anunciacao S. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Garantizado, Maria Auxiliadora G. [CONCREMAT Engenharia, Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The work presented was implemented in municipalities around the construction of the pipeline project Urucu-Coari-Manaus, the Engineering / IETEG-IENOR, because of the constant release of workers, consequently the finishing stages of this work and its future completion. The Project aims to guide saving gas with the workforce, their families and communities to the enterprise of small business cooperatives and solidarity within the potential of the site. This project is developed through the workshops: entrepreneur ship, tourism, use, reuse and recycling of products, and hortifruiti culture, agroecology, agribusiness (cooperativism solidarity) and forestry. Its execution took place in two phases, the first called 'pilot' of 12/12/2007 to 27/03/2008 in sections A and B1, in the municipality of Coari stretch and B2 in Caapiranga. The second phase occurred from 30/06 to 27/09/08, in the words B1, in the municipalities of Codajas and Anori words and B2 in Iranduba, Manacapuru and Anama. The workshops were held in state and municipal schools and administered by the Institute of Social and Environmental Amazon - ISAM, which had a team of coordinators, teachers, experts and masters of the time until the nineteen twenty-two hours to implement the project. (author)

  4. ISOLDE Off-line Gas Leak Upgrade

    CERN Document Server

    Nielsen, Kristoffer Bested

    2017-01-01

    This study investigates gas injection system of the ISOLDE Off-line separator. A quadrupole mass spectrometer is used to analysis the composition of the gas. Based on these measurements a contamination of the injected gas is found and a system upgrade is purposed. Furthermore a calibration of the leak rate of the leak valve is made.

  5. On-line optimal control improves gas processing

    International Nuclear Information System (INIS)

    Berkowitz, P.N.; Papadopoulos, M.N.

    1992-01-01

    This paper reports that the authors' companies jointly funded the first phase of a gas processing liquids optimization project that has the specific purposes to: Improve the return of processing natural gas liquids, Develop sets of control algorithms, Make available a low-cost solution suitable for small to medium-sized gas processing plants, Test and demonstrate the feasibility of line control. The ARCO Willard CO 2 gas recovery processing plant was chosen as the initial test site to demonstrate the application of multivariable on-line optimal control. One objective of this project is to support an R ampersand D effort to provide a standardized solution to the various types of gas processing plants in the U.S. Processes involved in these gas plants include cryogenic separations, demethanization, lean oil absorption, fractionation and gas treating. Next, the proposed solutions had to be simple yet comprehensive enough to allow an operator to maintain product specifications while operating over a wide range of gas input flow and composition. This had to be a supervisors system that remained on-line more than 95% of the time, and achieved reduced plant operating variability and improved variable cost control. It took more than a year to study various gas processes and to develop a control approach before a real application was finally exercised. An initial process for C 2 and CO 2 recoveries was chosen

  6. Gas purification project

    International Nuclear Information System (INIS)

    Broothaerts, J.; Claes, J.; Collard, G.; Goossens, W.; Harnie, R.; Heylen, P.; Vaesen, J.; Beukelaer, R. de; Dubois, G.; Glibert, R.; Mestrez, J.; Zahlen, A.

    1975-06-01

    Conceptual and experimental studies on LMFBR reprocessing and reactor off-gas purification systems are summarized. Iodine sorption on zeolites, low-temperature adsorption of noble gases on charcoal and catalytic oxidation of hydrogen, simulating tritium, are being studied in laboratory set-ups. A pilot loop with 25 m 3 h -1 throughput has been constructed. Results are quoted from the first phase of the iodine removal programme by scrubbing systems. Further extension of the test loop, comprising off-gases conditioning to removal of krypton in a cryodistillation unit, has been prepared. Delay-bed studies on 133 Xe extraction from LWR off-gases are reported. (author)

  7. Russians and Ukrainians plan new gas line

    International Nuclear Information System (INIS)

    TREND

    2003-01-01

    Paper deals with the building of new gas line between Russia and the Ukraine. In September 2003 Gazprom and Naftohaz Ukraine signed protocol about conditions of Russian gas transit through Ukrainian area for 2004. There is guaranteed quantity of transported gas on the level of 127,8 billions cubic meters by Russian side, 110 billions of it should next lead to Europe. Treaty refills long-term contract between Naftohaz and Gazprom about gas transit through Ukraine for period 2003-2013. Both countries and its companies plan to accept particular capital decision about building of new gas line Novopskov-Uzgorod till end of this year, which will be parallel with gas line Soyuz. It will allow to enlarge transportation system capacity by 28 billion cubic meters. Construction of about 1600 km long ducting system will require 1.6 billion USD by annual capacity about 15 billion cubic meters. If capacity would be doubled by construction of another compressor stations, capital expenses rise to 2.2 billions USD. It can be completely built in 7 years. Its linear part with one compressor can be already built in 3 years. Slovensky Plynarensky Podnik (SPP) would certainly have advantages from possible realisation of new gas line and from consequential transit increase. (Author)

  8. Dauphin Island natural gas project

    International Nuclear Information System (INIS)

    Layfield, R.P.; Elser, K.L.; Ostler, R.H.

    1994-01-01

    Arco Oil and Gas Co. installed the Dauphin Island production facility in a fragile Alabama marine environment supporting important fisheries and tourist facilities. The authors used proactive communication with governmental agencies, area industry, and the public; innovative construction technologies; and unique platform design to minimize the environmental and aesthetic impacts and to develop an economically successful gas field. The innovative equipment used in the offshore pipeline installation is a model approach for solving certain turbidity problems. The project has received numerous environmental awards

  9. Dauphin Island natural gas project

    Energy Technology Data Exchange (ETDEWEB)

    Layfield, R.P. (Arco International Oil and Gas Co., Plano, TX (United States)); Elser, K.L.; Ostler, R.H. (Arco Oil and Gas Co., Houston, TX (United States))

    1994-01-01

    Arco Oil and Gas Co. installed the Dauphin Island production facility in a fragile Alabama marine environment supporting important fisheries and tourist facilities. The authors used proactive communication with governmental agencies, area industry, and the public; innovative construction technologies; and unique platform design to minimize the environmental and aesthetic impacts and to develop an economically successful gas field. The innovative equipment used in the offshore pipeline installation is a model approach for solving certain turbidity problems. The project has received numerous environmental awards.

  10. Big gas project for Australia

    International Nuclear Information System (INIS)

    Jemain, A.

    2005-01-01

    Australia is re-launching its ambitions in liquefied natural gas (LNG) with the Greater Gorgon project of offshore exploitation of the natural gas reserves of the continental shelf of NW Australia. These reserves would represent 200 million tons of LNG which will be exported towards China and USA. The project will cost 11 billion dollars and will yield 2 billion dollars per year. It is managed by a consortium which groups together Chevron Corp. (50%), Shell (25%) and ExxonMobil (25%). Technip company is partner of the project. The China National Offshore Oil Corp (CNOOC) has announced its intention to become also partner of the project, and maybe Japan, South Korea and Taiwan will wish too. Short paper. (J.S.)

  11. Bolivia-Brazil gas line route detailed

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that state oil companies of Brazil and Bolivia have signed an agreement outlining the route for a 2,270 km pipeline system to deliver natural gas from Bolivian fields to Southeast Brazil. The two sides currently are negotiating details about construction costs as well as contract volumes and prices. Capacity is projected at 283-565 MMcfd. No official details are available, but Roberto Y. Hukai, a director of the Sao Paulo engineering company Jaako Poyry/Technoplan, estimates transportation cost of the Bolivian gas at 90 cents/MMBTU. That would be competitive with the price of gas delivered to the Sao Paulo gas utility Comgas, he the. Brazil's Petroleos Brasileiro SA estimates construction of the pipeline on the Brazilian side alone with cost $1.2-1.4 billion. Bolivia's Yacimientos Petroliferos Fiscales Bolivianos (YPFB) is negotiating with private domestic and foreign investors for construction of the Bolivian portion of the project

  12. Project installation the large equipment in line system in Brazil. Gas export line valve P-40 FPSO-MLS. Field Marlim Sul, Campos Basin, Brazil; Operacao de instalacao do maior equipamento no sistema in line ja realizado no Brasil. Valvula do gasoduto P-40 X FPSO-MLS. Campo de Marlim Sul, Bacia de Campos, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Marques, Marcos Antonio Rodrigues; Fernandes, Paulo Tavares [PETROBRAS, Campos dos Goytacases, RJ (Brazil). Exploracao e Producao

    2005-07-01

    This work will approach the current level of development of the installation of connected underwater equipment to flexible lines in the underwater engineering operations in Campos' Basin. The project will show studies, analysis and simulations (through software developed by PETROBRAS) about the installation of the largest equipment laid in the 'in-line' system (connected to flexible lines) in Brazil - and one of the largest of the world: the ESDV (Emergency Shut Down Valve) of the gas pipeline P-40 x FPSO-MLS, in the South Marlim field, in Campos' Basin. This ESDV, of about 18.000 kg, 4 m height and 6,5 m length, has the purpose of assuring the safety conditions on the facilities, interrupting the gas flow exported for P-40 in case of emergency situations. Its installation opened a new alternative in releasing underwater equipment, using the ships that install the flexible lines. This operation occurred in June, 2004, and required the use of a second vessel for support and monitoring of the ESDV laying. The ESDV was installed at 400 m from FPSO-MLS, in a water depth of 1.137 m. This method shall be used broadly by the company in the implantation of the new units of Campos' Basin, and the upcoming studies must consider the gradual increase of the water depth in the new projects. This work will focus the technological development in this area, and one of its purposes is to foresee the future difficulties that can appear in the implantation of the production systems in deep and ultra-deep waters. (author)

  13. Natural gas projects, strategies and economics

    International Nuclear Information System (INIS)

    Hamaide, G.

    2000-01-01

    This article summarizes the content of some of the posters presented during the WOC 9 working committee of the CMG 2000 worldwide gas congress: natural gas in the new worldwide energy balance; eastern Russia: the last gas projects; the new underwater technologies and the availability of natural gas. (J.S.)

  14. Natural gas purchasing for cogeneration projects

    International Nuclear Information System (INIS)

    Kubacki, J. Jr.

    1992-01-01

    This paper reports on the primary cost component for most gas-fired cogeneration or on-site power projects, cost of natural gas. Often gas comprises 50 to 65% of total project costs over the life of the project. Thus it is very important to focus on natural gas sourcing, pricing, transportation and storage. This important task should not be blindly delegated to a gas supplier. The end user must develop a gas strategy that results in the most cost-effective burnertip price. Long-term natural gas supplies are usually source from the three major producing regions: Mod-Continent, Gulf Coast, and Western Canada. A well-reasoned gas strategy must include: determination of transportation and distribution options from the project site to potential gas sources (including direct interconnection of the project to interstate pipelines); acquisition of competitive gas bids from suppliers in appropriate regions; negotiation of potential discounts from interstate pipelines and local distribution companies (LDCs); fine-tuning project economics by, for example, using storage to maximize transportation load factor; and pricing mechanisms that meet economic parameters of the project. This paper uses a hypothetical project in the Midwest to examine the major factors in devising a cost-effective natural gas sourcing

  15. HOT GAS LINES IN T TAURI STARS

    International Nuclear Information System (INIS)

    Ardila, David R.; Herczeg, Gregory J.; Gregory, Scott G.; Hillenbrand, Lynne A.; Ingleby, Laura; Bergin, Edwin; Bethell, Thomas; Calvet, Nuria; France, Kevin; Brown, Alexander; Edwards, Suzan; Johns-Krull, Christopher; Linsky, Jeffrey L.; Yang, Hao; Valenti, Jeff A.; Abgrall, Hervé; Alexander, Richard D.; Brown, Joanna M.; Espaillat, Catherine; Hussain, Gaitee

    2013-01-01

    For Classical T Tauri Stars (CTTSs), the resonance doublets of N V, Si IV, and C IV, as well as the He II 1640 Å line, trace hot gas flows and act as diagnostics of the accretion process. In this paper we assemble a large high-resolution, high-sensitivity data set of these lines in CTTSs and Weak T Tauri Stars (WTTSs). The sample comprises 35 stars: 1 Herbig Ae star, 28 CTTSs, and 6 WTTSs. We find that the C IV, Si IV, and N V lines in CTTSs all have similar shapes. We decompose the C IV and He II lines into broad and narrow Gaussian components (BC and NC). The most common (50%) C IV line morphology in CTTSs is that of a low-velocity NC together with a redshifted BC. For CTTSs, a strong BC is the result of the accretion process. The contribution fraction of the NC to the C IV line flux in CTTSs increases with accretion rate, from ∼20% to up to ∼80%. The velocity centroids of the BCs and NCs are such that V BC ∼> 4 V NC , consistent with the predictions of the accretion shock model, in at most 12 out of 22 CTTSs. We do not find evidence of the post-shock becoming buried in the stellar photosphere due to the pressure of the accretion flow. The He II CTTSs lines are generally symmetric and narrow, with FWHM and redshifts comparable to those of WTTSs. They are less redshifted than the CTTSs C IV lines, by ∼10 km s –1 . The amount of flux in the BC of the He II line is small compared to that of the C IV line, and we show that this is consistent with models of the pre-shock column emission. Overall, the observations are consistent with the presence of multiple accretion columns with different densities or with accretion models that predict a slow-moving, low-density region in the periphery of the accretion column. For HN Tau A and RW Aur A, most of the C IV line is blueshifted suggesting that the C IV emission is produced by shocks within outflow jets. In our sample, the Herbig Ae star DX Cha is the only object for which we find a P-Cygni profile in the C IV

  16. International gas trade: Potential major projects

    International Nuclear Information System (INIS)

    Haamsoe, B.; Mashayekhi, A.; Razavi, H.

    1994-01-01

    The present paper reviews some key factors affecting continued expansion of the use and trade of natural gas, with a particular focus on a group of major gas trade and transport projects now in various stages of consideration. The paper begins by outlining the distribution of potential gas supplies, it also sketches the sectorial and regional structures of potential demand for natural gas. It continues by considering current and emerging trends in the international trade of natural gas by pipeline and as liquefied natural gas (LNG). Within the context thus provided, the paper then details a number of significant potential gas trade and transportation projects individually. Finally, the paper comments on the challenges in financing and implementing gas projects, especially with regard to economic, political, and institutional issues in the producing, transit, and consuming countries

  17. Guidelines For Evaluation Of Natural Gas Projects

    International Nuclear Information System (INIS)

    Farag, H.; El Messirie, A.

    2004-01-01

    This paper is objected to give guidelines for natural gas projects appraisal These guidelines are summarized in modeling of natural gas demand forecast and energy pricing policies for different gas consumers mainly in the manufacturing, mining, transport, trade and agriculture sectors. Analysis of the results is made through sensitivity analysis and decision support system ( DSS )

  18. Flammable gas project topical report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, G.D.

    1997-01-29

    The flammable gas safety issue was recognized in 1990 with the declaration of an unreviewed safety question (USQ) by the U. S. Department of Energy as a result of the behavior of the Hanford Site high-level waste tank 241-SY-101. This tank exhibited episodic releases of flammable gas that on a couple of occasions exceeded the lower flammability limit of hydrogen in air. Over the past six years there has been a considerable amount of knowledge gained about the chemical and physical processes that govern the behavior of tank 241-SY-1 01 and other tanks associated with the flammable gas safety issue. This report was prepared to provide an overview of that knowledge and to provide a description of the key information still needed to resolve the issue. Items covered by this report include summaries of the understanding of gas generation, retention and release mechanisms, the composition and flammability behavior of the gas mixture, the amounts of stored gas, and estimated gas release fractions for spontaneous releases. `Me report also discusses methods being developed for evaluating the 177 tanks at the Hanford Site and the problems associated with these methods. Means for measuring the gases emitted from the waste are described along with laboratory experiments designed to gain more information regarding rates of generation, species of gases emitted and modes of gas storage and release. Finally, the process for closing the USQ is outlined as are the information requirements to understand and resolve the flammable gas issue.

  19. Jerneh gas project challenges and implementation performance

    International Nuclear Information System (INIS)

    Perreau, M.E.

    1993-01-01

    The Jerneh gas project is part of Peninsular Malaysia's Gas Utilization Project, a mammoth undertaking to provide gas from the offshore fields off Malaysia's East Coast, to power stations and other industrial users throughout Peninsular Malaysia and Singapore. Prior to 1992, the only customers of the offshore Peninsular Malaysia gas were a local power station, and a steel mill in Terengganu, linked to the Phase 1 pipeline system. The Bekok platform is Esso Production Malaysia Inc. (EPMI)'s gas collection platform for existing associated gas fields. The Duyong and Sotong platforms are gas production/compression platforms operated by PETRONAS. In late 1991, the onshore pipeline system was extended by PETRONAS to cover the west and south coasts of Peninsular Malaysia and Singapore depicted in the map as the Phase 2 system. With the completion of the Jerneh platform and offshore trunklines, Jerneh became the primary source of supply to an increased number of customers in the wider Phase 2 gas network. Jerneh is estimated to have three TCF of non-associated gas. Phase 1 customers were utilizing about 120 MSCFD and the demand is expected to initially step-up to 400 MSCFD in 1992 and progressively increase thereafter. This paper provides an overview of the US$400 M Jerneh project for which detailed design commenced in 1989 and was commissioned in 1992. The paper describes the technical challenges, project execution, safety record and actions to achieve the fast track schedule for this project

  20. Centar's gas centrifuge enrichment project

    International Nuclear Information System (INIS)

    Abajian, V.V.; Fishman, A.M.

    1976-01-01

    Plans for the building and operating of Centar Associates gas centrifuge uranium enrichment plant are described. Operating costs and machine manufacture are considered. Commitments with the utilities are summarised. (U.K.)

  1. Methane Gas Utilization Project from Landfill at Ellery (NY)

    Energy Technology Data Exchange (ETDEWEB)

    Pantelis K. Panteli

    2012-01-10

    Landfill Gas to Electric Energy Generation and Transmission at Chautauqua County Landfill, Town of Ellery, New York. The goal of this project was to create a practical method with which the energy, of the landfill gas produced by the decomposing waste at the Chautauqua County Landfill, could be utilized. This goal was accomplished with the construction of a landfill gas to electric energy plant (originally 6.4MW and now 9.6MW) and the construction of an inter-connection power-line, from the power-plant to the nearest (5.5 miles) power-grid point.

  2. Off-gas control project

    International Nuclear Information System (INIS)

    Torgerson, D.F.; Smith, I.M.

    1978-06-01

    A program to develop and study off-gas abatement techniques has recently been initiated at Whiteshell Nuclear Research Establishment (WNRE). This report provides information on the properties and expected behaviour of reprocessing plant off-gases, and outlines the experimental program to be undertaken. (author)

  3. On-line gas chromatographic analysis of airborne particles

    Science.gov (United States)

    Hering, Susanne V [Berkeley, CA; Goldstein, Allen H [Orinda, CA

    2012-01-03

    A method and apparatus for the in-situ, chemical analysis of an aerosol. The method may include the steps of: collecting an aerosol; thermally desorbing the aerosol into a carrier gas to provide desorbed aerosol material; transporting the desorbed aerosol material onto the head of a gas chromatography column; analyzing the aerosol material using a gas chromatograph, and quantizing the aerosol material as it evolves from the gas chromatography column. The apparatus includes a collection and thermal desorption cell, a gas chromatograph including a gas chromatography column, heated transport lines coupling the cell and the column; and a quantization detector for aerosol material evolving from the gas chromatography column.

  4. Flow lines and export lines of Sabalo Gas Field - the engineering of a complex job; Flow lines e export lines de Sabalo - a engenharia da complexidade

    Energy Technology Data Exchange (ETDEWEB)

    Serodio, Conrado Jose Morbach [GDK Engenharia, Salvador, BA (Brazil)

    2003-07-01

    The construction of the natural gas flow lines and export lines system of the Sabalo field, in the far South of Bolivia is an unique job in the pipeline construction area. Its execution is a turning point in terms of engineering and construction technology in this industry. Among the Aguarague Cordillera (mountains), it runs across rocky canyons for more than 5 km, a 2.100 mt long narrow tunnel to overcome the mountains and steep hills along all the ROW length, with a total extension of 70 km, in line pipes ranging from 10'' and 12'' for the flow lines, 28'' for the gas export line and 8' for the condensate line. An integrated construction work plan was settled in order to face and overcome the complex construction situations found in every feet of the pipeline. Four simultaneous work sites were mobilized, 8 independent work fronts, 700 professionals and more than 150 pieces of heavy construction equipment, brought from 3 different countries. Special techniques were adopted also to handle the challenging detail engineering . All in all, the correct conjunction of a sound engineering work, planning, human resources and equipment and the managing flexibility to create alternatives and solutions at the fast pace required by a dynamic work schedule were essential to succeed, in a job with no room for mistakes. The successfully job completion open new possibilities to other challenging projects alike.(author)

  5. Project development and commercialization of on-line analysis systems

    International Nuclear Information System (INIS)

    Watt, J.S.

    1997-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems are licensed to Australian companies, Amdel Ltd and Mineral Control Instrumentation Ltd. Both systems are used by industry worldwide, and are the market leaders for radioisotope gauges in their application field. The third system, the multiphase flow meter, was licensed in 1997 to Kvaerner FSSL Ltd of Aberdeen. This meter has even greater potential than the other two systems for economic benefit from its used and for numbers of installations. The on-line analysis systems have been developed to increase the productivity of the Australian mineral and energy industries, and to provide economic benefit to Australia. The economic benefit sought is predominantly improved process control based on use of the instrument, rather than from its sale. Sales of instruments are significant, however, with about A$80 million from the analysis systems and their derivatives since the 1970s. Some of the issues associated with the development of the on-line analysis system are outlined

  6. Hot gas cleaning, a targeted project

    Energy Technology Data Exchange (ETDEWEB)

    Romey, I. [University of Essen, Essen (Germany)

    1998-11-01

    Advanced hot gas cleaning systems will play a key role in future integrated combined cycle technologies. IGCC demonstration plants in operation or under construction are at present equipped with conventional wet gas scrubbing and cleaning systems. Feasibility studies for those IGCC plants have shown that the total efficiency of the processes can be improved using hot gas cleaning systems. However, this technology has not been developed and tested at a technical scale. Six well-known European industrial companies and research centres jointly worked together since January 1996 on a Targeted Project `Hot Gas Cleaning` to investigate and develop new hot gas cleaning systems for advanced clean coal power generation processes. In addition project work on chemical analysis and modelling was carried out in universities in England and Germany. The latest main findings were presented at the workshop. The main project aims are summarised as follows: to increase efficiency of advanced power generation processes; to obtain a reduction of alkalis and environmental emissions e.g. SO{sub 2}, NO{sub x}, CO{sub 2} and dust; and to develop the design basis for future industrial plants based on long-term operation of laboratory, pilot and demo-plants. To cover a range of possible process routes for future hot gas cleaning systems the following research programme is under investigation: removal of trace elements by different commercial and self developed sorbents; gas separation by membranes; separation of gas turbine relevant pollutants by hot filter dust and; H{sub 2}S removal and gas dedusting at high temperatures. 13 figs.

  7. On-line ultrasonic gas entrainment monitor

    International Nuclear Information System (INIS)

    Day, C.K.; Pedersen, H.N.

    1978-01-01

    Apparatus employing ultrasonic energy for detecting and measuring the quantity of gas bubbles present in liquids being transported through pipes is described. An ultrasonic transducer is positioned along the longitudinal axis of a fluid duct, oriented to transmit acoustic energy radially of the duct around the circumference of the enclosure walls. The back-reflected energy is received centrally of the duct and interpreted as a measure of gas entrainment. One embodiment employs a conical reflector to direct the transmitted acoustic energy radially of the duct and redirect the reflected energy back to the transducer for reception. A modified embodiment employs a cylindrical ultrasonic transducer for this purpose

  8. Oilfield Flare Gas Electricity Systems (OFFGASES Project)

    Energy Technology Data Exchange (ETDEWEB)

    Rachel Henderson; Robert Fickes

    2007-12-31

    The Oilfield Flare Gas Electricity Systems (OFFGASES) project was developed in response to a cooperative agreement offering by the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) under Preferred Upstream Management Projects (PUMP III). Project partners included the Interstate Oil and Gas Compact Commission (IOGCC) as lead agency working with the California Energy Commission (CEC) and the California Oil Producers Electric Cooperative (COPE). The project was designed to demonstrate that the entire range of oilfield 'stranded gases' (gas production that can not be delivered to a commercial market because it is poor quality, or the quantity is too small to be economically sold, or there are no pipeline facilities to transport it to market) can be cost-effectively harnessed to make electricity. The utilization of existing, proven distribution generation (DG) technologies to generate electricity was field-tested successfully at four marginal well sites, selected to cover a variety of potential scenarios: high Btu, medium Btu, ultra-low Btu gas, as well as a 'harsh', or high contaminant, gas. Two of the four sites for the OFFGASES project were idle wells that were shut in because of a lack of viable solutions for the stranded noncommercial gas that they produced. Converting stranded gas to useable electrical energy eliminates a waste stream that has potential negative environmental impacts to the oil production operation. The electricity produced will offset that which normally would be purchased from an electric utility, potentially lowering operating costs and extending the economic life of the oil wells. Of the piloted sites, the most promising technologies to handle the range were microturbines that have very low emissions. One recently developed product, the Flex-Microturbine, has the potential to handle the entire range of oilfield gases. It is deployed at an oilfield near Santa Barbara to run on waste gas

  9. Development of sealing plug for sweep gas line

    International Nuclear Information System (INIS)

    Kikuchi, Taiji; Yamada, Hirokazu; Saitoh, Takashi; Nakamichi, Masaru; Tsuchiya, Kunihiko; Kawamura, Hiroshi

    2004-03-01

    On the irradiation capsule for neutron irradiation test of the tritium breeder, the sealing plug is necessary to prevent a leak of tritium gas when the tritium breeder is picked up from the irradiation capsule after irradiation test. However, the general valve and plug cannot apply to sealing of the sweep gas line because of the following factors, the neutron irradiation effect, limited space in the irradiation capsule, high sealing efficiency, simple method and operation for control. Therefore, the sealing plug for sweep gas line has to be developed. This paper reports the development of the sealing plug for sweep gas line and the operating procedure of the sealing plug in the irradiation capsule. (author)

  10. Western Gas Sands Project status report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C.H.

    1978-11-30

    Progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States is summarized. A Technology Implementation Plan (TIP) meeting was held at the CER office in Las Vegas, Nevada, October 16--19 to initiate the implementation phase of the Enhanced Gas Recovery (EGR) working group activities. A WGSP Logging Program meeting was conducted on October 24, 1978, at CER offices to define the problems associated with logs in tight gas sands. CER personnel and the project manager attended a two-day course on the fundamentals of core and reservoir analysis in Denver, Colorado, and met with USGS personnel to discuss USGS work on the WGSP. A meeting was held to discuss a contract for coring a Twin Arrow well on the Douglas Creek Arch, Colorado. CER Corporation personnel attended the Geological Society of America Annual Meeting held in Toronto, Canada, October 23--27 and a Gas Stimulation Workshop at Sandia Laboratories in Albuquerque, New Mexico, October 11 and 12 to discuss recent mineback experiments conducted at the Nevada Test Site. Fiscal year 1979 projects initiated by USGS and the Energy Technology Centers and National Laboratories are progressing as scheduled. Mobil Research and Development Corporation fractured zone 8 of the F-31-13G well in Rio Blanco County, Colorado. Colorado Interstate Gas Company poured the concrete pad for the compresser expected to be delivered in December and were laying pipeline between the wells at month end. The Mitchell Energy well, Muse Duke No. 1 was flowing on test at a rate of 2,100 Mcfd and preparations proceeded to fracture the well on November 15 with approximately 1,000,000 gal of fluid and 3,000,000 lb of sand. Terra Tek completed laboratory analyses of cores taken from the Mitchell Energy well.

  11. Project development and commercialisation of on-line analysis systems

    International Nuclear Information System (INIS)

    Watt, J.S.

    2000-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects, usually lasting 7-10 years, has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems, licensed to Australian companies, are used world-wide. They are now the market leaders for radioisotope gauges in their application field. The third, the multiphase flow meter, was licensed in 1997 to an international company. This meter has even greater potential than the other two systems for economic benefit from its use and for numbers of installations. (author)

  12. Gas elephants: Arctic projects revived by expanding markets and pipelines

    International Nuclear Information System (INIS)

    Jaremko, G.

    2000-01-01

    The revival of interest in Arctic natural gas and the developing competition to extend the pipeline grid to Alaska and the Yukon and the Northwest territories are the subject of this report. Substantial agreement between competing interest groups is reported with respect to the need for Arctic gas and the willingness of the market to pay for bringing it south to consumers. The discussion centers on the construction of the Alliance Pipeline Project that will reportedly bring two billion cubic feet per day of excess capacity to transport natural gas from northeastern British Columbia to Chicago, and the 2,400 km long Foothills Pipelines System that carries about one-third of Canadian gas exports to middle-western states and California. Plans are to extend the line to 5,240 km by laying pipe in a giant Y pattern between Prudhoe Bay and the Mackenzie delta in the north, and the start of the Foothills System at Caroline in central Alberta. The estimated cost of the line is about $US 6 billion, using a 36-inch diameter line at increased pressures in place of the 56-inch diameter pipe used in the 1970s. Construction plans are similar for the rest of the big Y, the Dempster Lateral beside the Dempster Highway between Whitehorse and Inuvik. A competing project, the Northern Gas Pipeline Project is also discussed. This line would run east of Prudhoe Bay under the Beaufort Sea to the Mackenzie Delta; then south along the Mackenzie Valley to Alberta. Cost of this line is also estimated at $US 6 billion, however, it would have a capacity of four billion cubic feet per day, including 2.5 billion cubic feet from Alaska and 1.5 billion cubic feet from Canada. Strong revival of interest is also reported from the supply side, with BP Amoco, ARCO, Chevron Canada Resources, Ranger 0il Ltd., Paramount Resources, Berkley Petroleum Corporation, Canadian Forest Oil, Alberta Energy Company, Petro-Canada, Anderson Resources, and Poco Petroleum Ltd., all showing interest to mount new

  13. 77 FR 35366 - Albany-Eugene Transmission Line Rebuild Project

    Science.gov (United States)

    2012-06-13

    ... materials, removing vegetation including danger trees, and revegetating areas disturbed by construction... implement the Proposed Action Alternative, based on the Albany-Eugene Transmission Line Rebuild Project (DOE...

  14. 78 FR 33403 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2013-06-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-5-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Leidy Southeast Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal...

  15. 77 FR 59391 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-497-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assesment for the Proposed Brandywine Creek Replacement Project; Request for Comments on Environmental Issues; and Notice of Public Scoping Meeting The staff of the Federal...

  16. 76 FR 40717 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2011-07-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-4-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Northeast Supply Link Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy...

  17. 75 FR 42738 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-16-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Mid-Atlantic Connector Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting July 15, 2010. The...

  18. Hot-Gas Filter Ash Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Swanson, M.L.; Hurley, J.P.; Dockter, B.A.; O`Keefe, C.A.

    1997-07-01

    Large-scale hot-gas filter testing over the past 10 years has revealed numerous cases of cake buildup on filter elements that has been difficult, if not impossible, to remove. At times, the cake can blind or bridge between candle filters, leading to filter failure. Physical factors, including particle-size distribution, particle shape, the aerodynamics of deposition, and system temperature, contribute to the difficulty in removing the cake, but chemical factors such as surface composition and gas-solid reactions also play roles in helping to bond the ash to the filters or to itself. This project is designed to perform the research necessary to determine the fuel-, sorbent-, and operations-related conditions that lead to blinding or bridging of hot-gas particle filters. The objectives of the project are threefold: (1) Determine the mechanisms by which a difficult-to-clean ash is formed and how it bridges hot-gas filters (2) Develop a method to determine the rate of bridging based on analyses of the feed coal and sorbent, filter properties, and system operating conditions and (3) Suggest and test ways to prevent filter bridging.

  19. The Ikhil Gas Project: developing the first commercial natural gas project north of the Arctic Circle

    Energy Technology Data Exchange (ETDEWEB)

    Malin, G. [AltaGas Services Inc., AB (Canada)

    2001-07-01

    Development of the Ikhil Natural Gas Project by the Inuvialuit Petroleum Corporation in partnership with Enbridge and AltaGas Services are described in a step-by-step fashion. A minimum of 11 Bcf of recoverable natural gas reserves have been established to date. The Northwest Territories Power Corporation is committed under a 15-year take-or-pay contract to take the gas, and the Town of Inuvik also has a franchise agreement with the project owners for a 15-year period. Challenges faced and overcome in adapting to the regulatory process, the engineering problems that required special solutions (e.g. ice/snow roads, gravel pad to support wellhead and production facilities, reducing temperature of gas to avoid disturbing the permafrost, sand-padding pipeline to supplement high ice/content material), converting a diesel town to a natural gas town, and installing an underground distribution system in ground that is constantly shifting due to permafrost, are some of the examples discussed. Benefits accruing to local people and businesses during construction and the production phases of the project are described, along with details of an assessment and discussion of lessons learned after two years of operation. Overall, the project is considered to have been an engineering success. Financially, it is too early to judge, but it is expected that with economic development in Inuvik taking off, demand for natural gas and electricity will develop and justify the confidence of the developers.

  20. Metro orange line BRT project evaluation.

    Science.gov (United States)

    2011-10-01

    In partnership with the Los Angeles County Metropolitan Transportation Authority (Metro) and the Federal Transit Administration (FTA), the National Bus Rapid Transit Institute (NBRTI) conducted an evaluation of the Metro Orange Line BRT service, whic...

  1. Mackenzie Gas Project : gas resource and supply study

    International Nuclear Information System (INIS)

    Harris, D.G.; Braaten, K.M.

    2004-01-01

    A study was conducted to assess the future gas supply for the Mackenzie Gas Project. The economically recoverable gas resources and deliverability in the region were assessed in order to support construction of the Mackenzie Valley pipeline and the associated gathering system. This supply study was based on a 25 year timeframe for resource development. Production forecasts were also prepared for 50 years following the date of the study. Natural gas forecasts for the general area to be served by the proposed pipeline were also presented. This report includes an introduction to the final gas resource and supply study as well as the regional geology relating to discovered and undiscovered resources. The following regions were included in the study area: onshore Mackenzie Delta including the Niglintgak, Parsons Lake and Taglu anchor fields; central Mackenzie Valley region extending from the Mackenzie Delta south to 63 degrees latitude; northern portion of the Yukon Territory; and, portions of the offshore Mackenzie Delta region limited to a water depth of 30 metres. Forecasts and economic analyses were prepared for the following 3 scenarios: contingent onshore resources only; contingent and prospective onshore resources; and, contingent and prospective onshore and offshore resources. Sensitivity forecasts were prepared for a fully expanded pipeline capacity of 1.8 bcf/day with an equal capacity gathering system. In addition, the National Energy Board estimates of resources for the 3 anchor field were used in place of the operator's estimates. A geological review was included for the plays in the study area. 15 refs., 43 tabs., 38 figs

  2. Organic lining materials test in flue gas ducts

    International Nuclear Information System (INIS)

    Raveh, R.; Sfez, D.; Johannsson, L.

    1998-01-01

    Corrosion protection solutions are being widely used in electric power plants equipped with Flue Gas Desulfurization (FGD) systems. Organic lining materials are one of many solutions available on the market for corrosion protection. This market segment is found in a continuous development in order to fulfill the severe demands of these materials. The main goal of this test is to obtain information about the high temperature resistance of the materials as occurs when the FGD system is by-passed. Aster initial investigation of this market segment only a few lining materials were found compatible according to their manufacturer data. Seven of these materials were installed in the outlet flue gas duct of the Israeli power station M.D. B. This power station is not equipped with a FGD system, thus it gives a real simulation of the environmental conditions into which the lining material is subjected when the FGD system is by-passed. The materials installation was observed carefully and performed by representatives from the manufacturers in order to avoid material failure due to a non-adequate application. The power station was shut down and the lining materials were inspected three and a half months after the lining materials were applied. The inspection results were good and besides changes in the lining color, most materials did not show any damages. During that time the flue gas temperature at the duct was 134?C except some temperature fluctuations

  3. ACOUSTIC DETECTING AND LOCATING GAS PIPE LINE INFRINGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    John L. Loth; Gary J. Morris; George M. Palmer; Richard Guiler; Patrick Browning

    2004-10-31

    The extensive network of high-pressure natural gas transmission pipelines covering the United States provides an important infrastructure for our energy independence. Early detection of pipeline leaks and infringements by construction equipment, resulting in corrosion fractures, presents an important aspect of our national security policy. The National Energy Technology Laboratory Strategic Center for Natural Gas (SCVG) is and has been funding research on various applicable techniques. The WVU research team has focused on monitoring pipeline background acoustic signals generated and transmitted by gas flowing through the gas inside the pipeline. In case of a pipeline infringement, any mechanical impact on the pipe wall, or escape of high-pressure gas, generates acoustic signals traveling both up and down stream through the gas. Sudden changes in flow noise are detectable with a Portable Acoustic Monitoring Package (PAMP), developed under this contract. It incorporates a pressure compensating microphone and a signal- recording device. Direct access to the gas inside the line is obtained by mounting such a PAMP, with a 1/2 inch NPT connection, to a pipeline pressure port found near most shut-off valves. An FFT of the recorded signal subtracted by that of the background noise recorded one-second earlier appears to sufficiently isolate the infringement signal to allow source interpretation. Using cell phones for data downloading might allow a network of such 1000-psi rated PAMP's to acoustically monitor a pipeline system and be trained by neural network software to positively identify and locate any pipeline infringement.

  4. ACOUSTIC DETECTING AND LOCATING GAS PIPE LINE INFRINGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    John L. Loth; Gary J. Morris; George M. Palmer; Richard Guiler; Patrick Browning

    2004-12-01

    The extensive network of high-pressure natural gas transmission pipelines covering the United States provides an important infrastructure for our energy independence. Early detection of pipeline leaks and infringements by construction equipment, resulting in corrosion fractures, presents an important aspect of our national security policy. The National Energy Technology Laboratory Strategic Center for Natural Gas (SCVG) is and has been funding research on various applicable techniques. The WVU research team has focused on monitoring pipeline background acoustic signals generated and transmitted by gas flowing through the gas inside the pipeline. In case of a pipeline infringement, any mechanical impact on the pipe wall, or escape of high-pressure gas, generates acoustic signals traveling both up and down stream through the gas. Sudden changes in flow noise are detectable with a Portable Acoustic Monitoring Package (PAMP), developed under this contract. It incorporates a pressure compensating microphone and a signal- recording device. Direct access to the gas inside the line is obtained by mounting such a PAMP, with a 1/2 inch NPT connection, to a pipeline pressure port found near most shut-off valves. An FFT of the recorded signal subtracted by that of the background noise recorded one-second earlier appears to sufficiently isolate the infringement signal to allow source interpretation. Using cell phones for data downloading might allow a network of such 1000-psi rated PAMP's to acoustically monitor a pipeline system and be trained by neural network software to positively identify and locate any pipeline infringement.

  5. On-line non-contact gas analysis

    DEFF Research Database (Denmark)

    Fateev, Alexander; Clausen, Sønnik

    , and good agreement has been found for NO (e.g. deviations of 1-5% for NO at 1200 °C). Practical highresolution measurements at the AVV2 boiler are analysed, and detection limits for the NO are discussed. The developed tools and results will be used in the future projects, e.g. fast measurements of the gas...

  6. Study on the wiping gas jet in continuous galvanizing line

    Science.gov (United States)

    Kweon, Yong-Hun; Kim, Heuy-Dong

    2011-09-01

    In the continuous hot-dip galvanizing process, the gas-jet wiping is used to control the coating thickness of moving steel strip. The high speed gas-jet discharged from the nozzle slot impinges on the strip, and at this moment, wipes the liquid coating layer dragged by a moving strip. The coating thickness is generally influenced on the flow characteristics of wiping gas-jet such as the impinging pressure distribution, pressure gradient and shear stress distribution on the surface of strip. The flow characteristics of wiping gas-jet mentioned above depends upon considerably both the process operating conditions such as the nozzle pressure, nozzle-to-strip distance and line speed, and the geometry of gas-jet wiping apparatus such as the height of nozzle slot. In the present study, the effect of the geometry of nozzle on the coating thickness is investigated with the help of a computational fluid dynamics method. The height of nozzle slot is varied in the range of 0.6mm to 1.7mm. A finite volume method (FVM) is employed to solve two-dimensional, steady, compressible Navier-Stokes equations. Based upon the results obtained, the effect of the height of nozzle slot in the gas-jet wiping process is discussed in detail. The computational results show that for a given standoff distance between the nozzle to the strip, the effective height of nozzle slot exists in achieving thinner coating thickness.

  7. Comparative study of aerial transmission lines and underground isolated on gas

    International Nuclear Information System (INIS)

    Quesada Jimenez, Marco Esteban

    2012-01-01

    A comparison was made of aerial power lines and underground isolated on gas. Growing electric demand has given way to debate the lines transmission. Multiple discussions have generated about its application, however, the energy must be supplied and this process leads to the search for more efficient methods. The theory has covered the most important design criteria of the airlines and an introduction to the little known transport lines isolated on gas. The process of manufacturing, installation and operation are studied within the scope of the project. Count information is included in the main aspects of calculation relating to power transmission. Besides, the planning of the optimal route nominal calculations, load flow and power losses are focused as well as magnetic field strengths and finally economic analysis. (author) [es

  8. Central Arkansas Energy Project. Coal to medium-Btu gas

    Science.gov (United States)

    1982-05-01

    The Central Arkansas Energy Project has as its objective the conversion of coal in a central location to a more readily usable energy source, medium Btu gas (MBG), for use at dispersed locations as fuel for power production and steam generation, or as a feedstock for chemical processing. The project elements consist of a gasification facility to produce MBG from coal, a pipeline to supply the MBG to the dispersed sites. The end of line users investigated were the repowering or refueling of an existing Arkansas Power and Light Co. Generating station, an ammonia plant, and a combined cycle cogeneration facility for the production of steam and electricity. Preliminary design of the gasification plant including process engineering design bases, process flow diagrams, utility requirements, system description, project engineering design, equipment specifications, plot plan and section plot plans, preliminary piping and instrument diagrams, and facilities requirements. Financial analyses and sensitivities are determined. Design and construction schedules and manpower loadings are developed. It is concluded that the project is technically feasible, but the financial soundness is difficult to project due to uncertainty in energy markets of competing fuels.

  9. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-11-19

    This is the second technical report, covering the period from April 1, 2003 through September 30, 2003. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. The geo-technical component is a shared effort between the State Department of Administration and the US Department of Energy. The Alaska Oil and Gas Conservation Commission is rapidly converting high volumes of paper documents and geo-technical information to formats suitable for search and retrieval over the Internet. The permitting component is under the lead of the DNR Office of Project Management and Permitting. A web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information on-line. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. Structural changes are taking place in terms of organization, statutory authority, and regulatory requirements. Geographic Information Systems are a central component to the organization of information, and the delivery of on-line services. Progress has been made to deploy the foundation system for the shared GIS based on open GIS protocols to the extent feasible. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells.

  10. 21 CFR 870.4410 - Cardiopulmonary bypass in-line blood gas sensor.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cardiopulmonary bypass in-line blood gas sensor... Cardiopulmonary bypass in-line blood gas sensor. (a) Identification. A cardiopulmonary bypass in-line blood gas sensor is a transducer that measures the level of gases in the blood. (b) Classification. Class II...

  11. Fracture propagation in gas pipelines - relevance to submarine lines

    Energy Technology Data Exchange (ETDEWEB)

    Fearnehough, G D [British Gas Corp., Newcastle upon Tyne. Engineering Research Station

    1976-09-01

    This paper reviews the factors which control fracture propagation in pipes and suggests how they are influenced by submarine environments. If fracture arrest capability is required then these factors should be considered in terms of the design philosophy and the maximum tolerable length of fracture which can be repaired. The paper shows that brittle fracture characteristics of submarine pipelines are probably similar to land based lines and fracture arrest can only be guaranteed by appropriate material toughness specification. Resistance to ductile fracture propagation in submarine lines is enhanced by lower design stresses, thicker pipe, concrete coating and the effect of hydrostatic head on gas dynamics. However, additional factors due to submarine design can be deleterious viz: uncertainty about backfill integrity and a tendency of thicker steels to low fracture resistance arising from 'separation' formation. Attention is drawn to problems which may arise with transportation of gases rich in hydrocarbons and the use of mechanical methods of fracture arrest.

  12. Electronegative Gas Thruster - Direct Thrust Measurement Project

    Science.gov (United States)

    Dankanich, John (Principal Investigator); Aanesland, Ane; Polzin, Kurt; Walker, Mitchell

    2015-01-01

    This effort is an international collaboration and academic partnership to mature an innovative electric propulsion (EP) thruster concept to TRL 3 through direct thrust measurement. The initial target application is for Small Satellites, but can be extended to higher power. The Plasma propulsion with Electronegative GASES (PEGASES) concept simplifies ion thruster operation, eliminates a neutralizer requirement and should yield longer life capabilities and lower cost implementation over conventional gridded ion engines. The basic proof-of concept has been demonstrated and matured to TRL 2 over the past several years by researchers at the Laboratoire de Physique des Plasma in France. Due to the low maturity of the innovation, there are currently no domestic investments in electronegative gas thrusters anywhere within NASA, industry or academia. The end product of this Center Innovation Fund (CIF) project will be a validation of the proof-of-concept, maturation to TRL 3 and technology assessment report to summarize the potential for the PEGASES concept to supplant the incumbent technology. Information exchange with the foreign national will be one-way with the exception of the test results. Those test results will first go through a standard public release ITAR/export control review, and the results will be presented in a public technical forum, and the results will be presented in a public technical forum.

  13. The line-emitting gas in active galaxies - A probe of the nuclear engine

    Science.gov (United States)

    Veilleux, Sylvain

    1993-01-01

    This paper reviews some of the basic questions regarding the structure of the engine powering active galactic nuclei (AGN), the nature of the interaction between the AGN and the host galaxy, and the origin and evolution of AGN. The study of the dynamics and physical characteristics of the line-emitting gas in these objects has proven fruitful in addressing many of these issues. Recent advances in optical and infrared detector technology combined with the development of superior ground-based instruments have produced efficient new tools for the study of the line-emitting gas on nuclear and Galactic scales. Programs which take advantage of two of these new techniques, Fabry-Perot imaging spectroscopy and infrared spectroscopy, are described in this paper. The origin of nuclear activity in galaxies is also addressed in a third project which aims at determining the nature of luminous infrared galaxies.

  14. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil

  15. 77 FR 5489 - Identification of Human Cell Lines Project

    Science.gov (United States)

    2012-02-03

    ... individual or species. With the advent of standardized, simple, and rapid methods for human cell line... project will undergo STR profiling, a DNA profiling method that examines/screens for STRs (DNA elements 2... distinct DNA profile and when the STR DNA fragment sizes are converted to numeric values, the DNA profiles...

  16. Ranking Canadian oil and gas projects using TOPSIS

    Directory of Open Access Journals (Sweden)

    Seyed Jafar Sadjadi

    2017-08-01

    Full Text Available One of the primary concerns for investment in oil and gas projects is to have a comprehensive understanding on different issues associated with this industry. The industry is mainly influ-enced by the price of oil and gas and in some events, many production units have been forced to shut down solely because of low price of oil and gas. Environmental issues are other important factors, which may put pressure on Canada’s political affairs since the country has strong com-mitment to reduce green gas effect. In this paper, we introduce a multi-criteria decision making method, which helps us rank different projects in terms of investment. The proposed study con-siders different investment factors including net present value, rate of return, benefit-cost analy-sis and payback period along with the intensity of green gas effects for ranking the present oil and gas projects in Canada.

  17. Landfill Gas Energy Project Development Handbook

    Science.gov (United States)

    View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.

  18. Massive hydraulic fracturing gas stimulation project

    International Nuclear Information System (INIS)

    Appledorn, C.R.; Mann, R.L.

    1977-01-01

    The Rio Blanco Massive Hydraulic Fracturing Project was fielded in 1974 as a joint Industry/ERDA demonstration to test the relative formations that were stimulated by the Rio Blanco Nuclear fracturing experiment. The project is a companion effort to and a continuation of the preceding nuclear stimulation project, which took place in May 1973. 8 figures

  19. 77 FR 32626 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Impact...

    Science.gov (United States)

    2012-06-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF09-8-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Rockaway Delivery Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federa...

  20. Safeguards and security benefits of project straight-line

    International Nuclear Information System (INIS)

    Jaeger, C.D.; Waddoups, I.G.

    1995-01-01

    As a result of a number of events the inventory of fissile materials no longer in nuclear weapons in the United States is increasing. This has led to a growing concern regarding the potential for theft and/or diversion and accountability of this material. Straight-Line is a project whose purpose is to demonstrate a site-independent system to monitor stored nuclear material (e.g. plutonium) and integrate the collection, processing and dissemination of information regarding this material. Safeguards and security (S ampersand S) goals of this project include data transfer of information on nuclear material to appropriate users to enhance S ampersand S, continuous on-line accountability, reduction of hands-on access to nuclear materials, incorporation of information security technologies, and early detection of tampering or unauthorized material movement. This paper addresses threat considerations, S ampersand S requirements, S ampersand S objectives, and issues for the Straight-Line project. S ampersand S features and benefits of this project are discussed with respect to existing item monitoring systems and/or other material tracking systems being developed

  1. Twisted sigma-model solitons on the quantum projective line

    Science.gov (United States)

    Landi, Giovanni

    2018-04-01

    On the configuration space of projections in a noncommutative algebra, and for an automorphism of the algebra, we use a twisted Hochschild cocycle for an action functional and a twisted cyclic cocycle for a topological term. The latter is Hochschild-cohomologous to the former and positivity in twisted Hochschild cohomology results into a lower bound for the action functional. While the equations for the critical points are rather involved, the use of the positivity and the bound by the topological term lead to self-duality equations (thus yielding twisted noncommutative sigma-model solitons, or instantons). We present explicit nontrivial solutions on the quantum projective line.

  2. The Nabucco project's economic failure - Lessons for the European Union's foreign gas policy

    International Nuclear Information System (INIS)

    Finon, D.

    2010-01-01

    This article criticises the new strategy of the European Union's foreign gas policy. The new policy translates in the setting up of gas corridors to diversify importations in a context of increased political competition with Russia. The inherent limitations of the EU's plan to promote the Nabucco gas pipeline as merchant line without seeking exporter involvement in the project are analysed. Such limitations are analysed through various economic prospects. A micro-economic calculation shows the significance of the use rate of a gas pipeline for profitability. The competition theory shows the possibility for an existing dominating firm to compete with a newcomer's investment by building equipment likely to pre-empt access to the resources. The transaction cost saving shows how long term undertakings between producers and suppliers are necessary for the development of transit infrastructures and distant gas fields. The article ends with the need for economic relevance in the EU's gas policy actions. (author)

  3. EVEGAS Project (European validation exercise of GAS migration model)

    Energy Technology Data Exchange (ETDEWEB)

    Manai, T. [Geostock S.A., Rueil-Malmaison (France)

    1995-03-01

    The EVEGAS project aims at the verification and validation of numerical codes suitable for simulating gas flow phenomenon in low permeability porous media. Physical phenomena involved in gas generation and gas flow are numerous, often complex, and may not be very well described. The existing numerical codes cannot represent all the occurring possible phenomena, but allow a good trade-off betwen simplicity and representativity of such phenomena. Two phase flow (Gas and Water) appear to be the most consequential phenomena in gas migration and pressure sizing. The project is organised in three major steps: (1) a simple problem with analytical solutions. (2) A few problems based on laboratory or in-situ experiments. (3) A 3-D repository scenarios involving the following aspects: a repository design; a source of gas; rock characteristics; and fluid characteristics.

  4. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  5. Fort Peck-Wolf Point transmission line project, Montana

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the project is to replace the existing 36-mile Fort Peck-Wolf Point transmission line which has reached the end of its useful service life. Presently, the overall condition of this existing section of the 47-year-old line is poor. Frequent repairs have been required because of the absence of overhead ground wires. The continued maintenance of the line will become more expensive and customer interruptions will persist because of the damage due to lightning. The expense of replacing shell rotted poles, and the concern for the safety of the maintenance personnel because of hazards caused by severe shell rot are also of primary importance. The operational and maintenance problems coupled with power system simulation studies, demonstrate the need for improvements to the Wolf Point area to serve area loads. Western's Wolf Point Substation is an important point of interconnection for the power output from the Fort Peck Dam to area loads as far away as Williston, North Dakota. The proposed transmission line replacement would assure that there will continue to be reliable transmission capacity available to serve area electrical loads, as well as provide a reliable second high-voltage transmission path from the Fort Peck generation to back-up a loss of the Fort Peck-Wolf Point 115-kV Line No. 1

  6. Brazil-Bolivia natural gas project challenges and solutions

    International Nuclear Information System (INIS)

    Costa, A.S.C.

    1993-01-01

    PETROBRAS, the Brazilian/International Integrated Oil and Gas Company, is leading US$ 4 billion natural gas project. The goal of this paper is to identify Project challenges and propose solutions. It starts with fundamentals. Natural gas' share in Brazilian primary energy demand is only 2%. Economic aspects and environmental concerns, however, are changing this picture. For the Bolivian economy to be linked to a relatively huge market, in the long-term, is certainly a suitable decision. Besides, this Project will promote regional integration, within and outside Marcosur economies. Reserves, market data and economics give support to a feasible Project Financial structure is the main challenge. INTERGAS, a new subsidiary of PETROBRAS is opened for 49% stock to private sector participation. As an integrated Project, many opportunities will be generated during construction and operation. E ampersand P, pipeline and downstream investments could bring different investors to different sectors

  7. Landfill Gas Electricity Project Interconnection Webinar

    Science.gov (United States)

    This page contains information about a webinar LMOP offered to LMOP Partners to address questions associated with connecting electricity generating systems to the grid during LFG energy project planning and implementation.

  8. Natural gas consumption trends and demand projections for Pakistan

    International Nuclear Information System (INIS)

    Uqaili, M.A.; Harijan, K.; Memon, H.U.R.

    2005-01-01

    Pakistan is an energy deficient country and heavily depends on imported energy. Natural gas is a dominating source of commercial energy in the country. This paper presents the natural gas consumption trends and future demand projections for Pakistan. The paper also investigates the potential utilization options of natural gas in the country. The study indicates that the natural gas consumption in the country increased rapidly at an average growth rate of about 6.8% per annum during the last three decades. Currently, natural gas contributes about 44.2% of the primary commercial energy supply in the country. Power, Fertilizer, General industry and Domestic sectors are the major consumers of gas in the country. The paper concludes the natural gas demand in the country is projected to increase to about 34-64 MTOE (Million Tonnes of Oil Equivalent) by the year 2018. Enhancement in the indigenous exploration and modulation of gas and import of gas from central Asian Sates is essential for meeting the growing gas demand, protecting the environment and increasing the economic independence in the country. (author)

  9. Project Safe. Gas related processes in SFR

    Energy Technology Data Exchange (ETDEWEB)

    Moreno, L. [Royal Inst. of Technology, Stockholm (Sweden). Dept. of Chemical Engineering; Skagius, K.; Soedergren, S.; Wiborgh, M. [Kemakta Konsult AB, Stockholm (Sweden)

    2001-06-01

    The radionuclide release from the SFR repository caused by gas generation was calculated for different scenarios for three repository parts (Silo, BMA and 1BTF). The calculation cases are based on the way the gas escapes from the concrete structures. In the basic cases the gas escapes through the evacuation pipes in the concrete lid of the Silo, through existing gaps between the concrete walls and the lid in BMA, and through the concrete backfill surrounding the waste packages in 1BTF. These cases correspond to the situation that we expect to occur. Another category of cases corresponds to the situation where an initial fracture exists in the concrete structures. The fracture is assumed to exist at the bottom of the respective concrete structure in the Silo and BMA. For 1BTF the initial defect is represented by a fracture transversely crossing the section containing the steel drums with ashes. Other cases were also calculated with the purpose of studying some special situations. For example, the consequences of a silo repository without evacuation pipes and backfill in the interior of BMA. The radionuclide release, for some radionuclides, may be increased by several orders of magnitude when contaminated water is expelled by gas from the interior of the concrete structures. However, the impact on the total doses during the first thousands years after closure of the repository is limited. The total dose is dominated by the release of organic {sup 14}C. Since the radionuclides are released to the coastal area during the first thousand years the dilution is considerable, which results in a very low dose.

  10. Project Safe. Gas related processes in SFR

    International Nuclear Information System (INIS)

    Moreno, L.

    2001-06-01

    The radionuclide release from the SFR repository caused by gas generation was calculated for different scenarios for three repository parts (Silo, BMA and 1BTF). The calculation cases are based on the way the gas escapes from the concrete structures. In the basic cases the gas escapes through the evacuation pipes in the concrete lid of the Silo, through existing gaps between the concrete walls and the lid in BMA, and through the concrete backfill surrounding the waste packages in 1BTF. These cases correspond to the situation that we expect to occur. Another category of cases corresponds to the situation where an initial fracture exists in the concrete structures. The fracture is assumed to exist at the bottom of the respective concrete structure in the Silo and BMA. For 1BTF the initial defect is represented by a fracture transversely crossing the section containing the steel drums with ashes. Other cases were also calculated with the purpose of studying some special situations. For example, the consequences of a silo repository without evacuation pipes and backfill in the interior of BMA. The radionuclide release, for some radionuclides, may be increased by several orders of magnitude when contaminated water is expelled by gas from the interior of the concrete structures. However, the impact on the total doses during the first thousands years after closure of the repository is limited. The total dose is dominated by the release of organic 14 C. Since the radionuclides are released to the coastal area during the first thousand years the dilution is considerable, which results in a very low dose

  11. Gas core nuclear rocket feasibility project

    International Nuclear Information System (INIS)

    Howe, S.D.; DeVolder, B.; Thode, L.; Zerkle, D.

    1997-09-01

    The next giant leap for mankind will be the human exploration of Mars. Almost certainly within the next thirty years, a human crew will brave the isolation, the radiation, and the lack of gravity to walk on and explore the Red planet. However, because the mission distances and duration will be hundreds of times greater than the lunar missions, a human crew will face much greater obstacles and a higher risk than those experienced during the Apollo program. A single solution to many of these obstacles is to dramatically decrease the mission duration by developing a high performance propulsion system. The gas core nuclear rocket (GCNR) has the potential to be such a system. The gas core concept relies on the use of fluid dynamic forces to create and maintain a vortex. The vortex is composed of a fissile material which will achieve criticality and produce high power levels. By radiatively coupling to the surrounding fluids, extremely high temperatures in the propellant and, thus, high specific impulses can be generated. The ship velocities enabled by such performance may allow a 9 month round trip, manned Mars mission to be considered. Alternatively, one might consider slightly longer missions in ships that are heavily shielded against the intense Galactic Cosmic Ray flux to further reduce the radiation dose to the crew. The current status of the research program at the Los Alamos National Laboratory into the gas core nuclear rocket feasibility will be discussed

  12. Canby Area Service Project substation and associated transmission line

    International Nuclear Information System (INIS)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ''environmental impact statement'' is not required

  13. Spin Start Line Effects on the J2X Gas Generator Chamber Acoustics

    Science.gov (United States)

    Kenny, R. Jeremy

    2011-01-01

    The J2X Gas Generator engine design has a spin start line connected near to the turbine inlet vanes. This line provides helium during engine startup to begin turbomachinery operation. The spin start line also acts as an acoustic side branch which alters the chamber's acoustic modes. The side branch effectively creates 'split modes' in the chamber longitudinal modes, in particular below the first longitudinal mode and within the frequency range associated with the injection-coupled response of the Gas Generator. Interaction between the spin start-modified chamber acoustics and the injection-driven response can create a higher system response than without the spin start attached to the chamber. This work reviews the acoustic effects of the spin start line as seen throughout the workhorse gas generator test program. A simple impedance model of the spin start line is reviewed. Tests were run with no initial spin start gas existing in the line, as well as being initially filled with nitrogen gas. Tests were also run with varying spin start line lengths from 0" to 40". Acoustic impedance changes due to different spin start gas constituents and line lengths are shown. Collected thermocouple and static pressure data in the spin start line was used to help estimate the fluid properties along the line length. The side branch impedance model was coupled to a chamber impedance model to show the effects on the overall chamber response. Predictions of the spin start acoustic behavior for helium operation are shown and compared against available data.

  14. Multi objective optimization of line pack management of gas pipeline system

    International Nuclear Information System (INIS)

    Chebouba, A

    2015-01-01

    This paper addresses the Line Pack Management of the ''GZ1 Hassi R'mell-Arzew'' gas pipeline. For a gas pipeline system, the decision-making on the gas line pack management scenarios usually involves a delicate balance between minimization of the fuel consumption in the compression stations and maximizing gas line pack. In order to select an acceptable Line Pack Management of Gas Pipeline scenario from these two angles for ''GZ1 Hassi R'mell- Arzew'' gas pipeline, the idea of multi-objective decision-making has been introduced. The first step in developing this approach is the derivation of a numerical method to analyze the flow through the pipeline under transient isothermal conditions. In this paper, the solver NSGA-II of the modeFRONTIER, coupled with a matlab program was used for solving the multi-objective problem

  15. Oman- Decisive progress for the Liquefied Natural Gas (LNG) project

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The soon signature of a firm contract with the Korea Gas Corporation and the perspective of an agreement with Thailand will allow the attribution of a construction contract in September 1996. The hypothesis of a third liquefaction train seems to be more and more probable. The project of Oman-India gas pipeline is not given up but only put it back to several years. (N.C.)

  16. Shell's Caroline gas project on track in southwest Alberta

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that western Canada's biggest sour natural gas, sulfur, and natural gas liquids development project in 2 decades is on target to start up late this year. Shell Canada Ltd.'s $950 million (Canadian) Caroline project will produce 2 tcf of gas and associated products from the Swan Hills member of the middle Devonian Beaverhill Lake group. The price tag will reach about $1 billion, including some start-up costs. The project is designed to process an average 300 MMcfd of gas. It will produce 17,500 b/d of pentanes plus, 4,100 metric tons/day of sulfur, 90 MMcfd of sales gas, and 28,000 b/d of NGL-ethane, propane, and butane. A labor force that is peaking at about 2,400 workers is completing a network of processing plants, about 143 miles of pipeline, three field compressors, and other facilities covering an area of 161 sq miles. Dilcon Constructors Ltd., an arm of Delta Catalytic Corp., Calgary, is the main contractor for the project. About 85% of the services and equipment for Caroline are coming from Alberta suppliers, 7% from suppliers elsewhere in Canada, and only 8% from non-Canadian Sources

  17. Broad-line high-excitation gas in the elliptical galaxy NGC5128

    International Nuclear Information System (INIS)

    Phillips, M.M.; Taylor, K.; Axon, D.J.; Atherton, P.D.; Hook, R.N.

    1984-01-01

    A faint, but extensive component of broad-line ionized gas has been discovered in the peculiar giant elliptical galaxy NGC5128. This component has a radically different spatial distribution from the well-studied rotating photoionized gas associated with the dust lane although the velocity fields of the two components are similar. The origin of the broad-line gas is considered as its possible relation to the active nucleus and the X-ray jet discussed. (author)

  18. Western Gas Sands Project: stratigrapy of the Piceance Basin

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, S. (comp.)

    1980-08-01

    The Western Gas Sands Project Core Program was initiated by US DOE to investigate various low permeability, gas bearing sandstones. Research to gain a better geological understanding of these sandstones and improve evaluation and stimulation techniques is being conducted. Tight gas sands are located in several mid-continent and western basins. This report deals with the Piceance Basin in northwestern Colorado. This discussion is an attempt to provide a general overview of the Piceance Basin stratigraphy and to be a useful reference of stratigraphic units and accompanying descriptions.

  19. Summer Student Project: GEM Simulation and Gas Mixture Characterization

    CERN Document Server

    Oviedo Perhavec, Juan Felipe

    2013-01-01

    Abstract This project is a numerical simulation approach to Gas Electron Multiplier (GEM) detectors design. GEMs are a type of gaseous ionization detector that have proposed as an upgrade for CMS muon endcap. The main advantages of this technology are high spatial and time resolution and outstanding aging resistance. In this context, fundamental physical behavior of a Gas Electron Multiplier (GEM) is analyzed using ANSYS and Garfield++ software coupling. Essential electron transport properties for several gas mixtures were computed as a function of varying electric and magnetic field using Garfield++ and Magboltz.

  20. Major gas projects in Latin America. Issues and perspectives

    International Nuclear Information System (INIS)

    Khelil, C.

    1997-01-01

    The Latin American energy demand will reach 677 MTOE by 2010, a 50% increase over 1995. There will be a major shift towards use of natural gas in power generation. US 503 10 9 Dollars will be required over 1995-2010 to discover and develop hydrocarbon reserves, build the pipeline system as well as generate and distribute electricity. US 19 10 9 Dollars will be required for gas pipelines and LNG projects in the region. Improvements in the policy, legal and regulatory framework are required in many countries to attract the needed investments. Several major gas projects are being implemented or planned in the region: Colombia Enron-built pipeline, Peru Camisea project, Chile Nova gas pipeline from Argentina, the Bolivia-Brazil pipeline and others. The World Bank group has been assisting countries in developing a competitive business environment and can provide, when needed, comfort to lenders in project financing through a guarantee scheme in several large complex cross border projects. (au)

  1. Project on effects of gas in underground storage facilities for radioactive waste (Pegasus project)

    International Nuclear Information System (INIS)

    Haijtink, B.; McMenamin, T.

    1993-01-01

    Whereas the subject of gas generation and gas release from radioactive waste repositories has gained in interest on the international scene, the Commission of the European Communities has increased its research efforts on this issue. In particular, in the fourth five-year R and D programme on management and storage of radioactive waste (1990-94), a framework has been set up in which research efforts on the subject of gas generation and migration, supported by the CEC, are brought together and coordinated. In this project, called Pegasus, about 20 organizations and research institutes are involved. The project covers theoretical and experimental studies of the processes of gas formation and possible gas release from the different waste types, LLW, ILW and HLW, under typical repository conditions in suitable geological formations such as clay, salt and granite. In this report the present status of the various research activities are described and 13 papers have been selected

  2. Middle East gas export projects: The case of Abu Dhabi

    International Nuclear Information System (INIS)

    Al Marzooqi, H.

    1995-01-01

    Abu Dhabi is ranked in the industry journals in the top 5 in the world tables of both oil and gas reserves. Gas is produced both Onshore and Offshore from associated and non-associated fields. Production has tripped during the last ten years and will increase further in the next few years as a result of current and planned investment. Development of Abu Dhabi's gas resources is aimed at enhancing oil production and recovery, meeting local and export demand and eliminating waste. Companies in Abu Dhabi are involved in all the main sectors of gas industry including production, processing, transportation and sales. The first large LNG export project by sea in Arabian Gulf was established in 1977 from Abu to Japan. Development continues and the gas is exported as LNG and is also processed into LPG and Pentane Plus for export. Japan remains the main market. The volume of Condensate available for export and processing will increase significantly in the next few years. In order to ensure a continuing and increasing supply of gas to world markets, in future years, prices will need to provide an adequate return on investment and should also reflect the environmental advantages of gas. 9 tabs

  3. Radio recombination lines from diffuse interstellar gas in the Galaxy

    International Nuclear Information System (INIS)

    Cersosimo, J.C.; Onello, J.S.

    1991-01-01

    The paper reports the detection of the H159-alpha and H200-beta radio recombination lines at 1.62 GHz at l = 30.5 deg and 31.0 deg in the Galactic plane. Using the new observations obtained with the NRAO 43 m telescope a non-LTE analysis is presented to show that the observed LTE intensity ratio for these lines can arise from an inhomogeneous ionized nebula with a low-density component. 16 refs

  4. Gas quality analysis and evaluation program for project Gasbuggy

    Energy Technology Data Exchange (ETDEWEB)

    Smith, C F [Lawrence Radiation Laboratory, University of California, Livermore, CA (United States)

    1970-05-01

    Experimental results of the gas quality analysis program for Project Gasbuggy through August 1969 are presented graphically, addressing the questions raised by the preshot program goals. The chemical composition and the concentrations of tritium, krypton-85, carbon-14 and argon-37, 39 are presented as a function of time and gas production from the nuclear chimney. Chemically, the presence of CO{sub 2}, CO and H{sub 2} served to dilute the formation gas and caused reactions which significantly altered the gas composition at early times. The radionuclide content of the chimney gas at reentry was some 800 pCi/cm{sup 3} of which about 80% was CH{sub 3}T. Lesser quantities of tritium were observed as HT, C{sub 2}H{sub 5}T and C{sub 3}H{sub 7}T. The other major contaminant was Kr{sup 85} which was present at about one-fifth the level of CH{sub 3}T. Small quantities of carbon-14 and argon-39 were also identified. The only other radionuclides identified in the gas were relatively short-lived rare gases. During the production testing, about two and one-half chimney volumes of gas at formation pressure were removed. This removal, accompanied by dilution, has reduced the radionuclide concentrations to about 7% of their levels at reentry. The production characteristics of the Gasbuggy environment prevented an adequate test of the effectiveness of chimney flushing. However, the rapid drawdown concept is supported by the available data as an effective means of reducing contaminant levels. The changes in composition during production or testing are seen to be consistent with a model involving a non-uniform gas influx rate and flow distribution over the chimney region. Mixing times are estimated to be on the order of a few days, so that increasing concentrations following a sudden gas influx can be explained. (author)

  5. Gas generation matrix depletion quality assurance project plan

    International Nuclear Information System (INIS)

    1998-01-01

    The Los Alamos National Laboratory (LANL) is to provide the necessary expertise, experience, equipment and instrumentation, and management structure to: Conduct the matrix depletion experiments using simulated waste for quantifying matrix depletion effects; and Conduct experiments on 60 cylinders containing simulated TRU waste to determine the effects of matrix depletion on gas generation for transportation. All work for the Gas Generation Matrix Depletion (GGMD) experiment is performed according to the quality objectives established in the test plan and under this Quality Assurance Project Plan (QAPjP)

  6. On-line valve monitoring at the Ormen Lange gas plant

    Energy Technology Data Exchange (ETDEWEB)

    Greenlees, R.; Hale, S. [Score Atlanta Inc., Kennesaw, Georgia (United States)

    2011-07-01

    The purpose of this presentation is to discuss replacing time and labor intensive nuclear outage activities with on line condition monitoring solutions, primarily the periodic verification of MOV functionality discussed in USNRC Generic Letter 96.05. This regulation requires that MOV age related performance degradations are properly identified and accounted for, causing utilities to have to retest valves periodically for the duration of the plants operating license. AECL designed CANDU reactors have a world class performance and safety record, with typical average annual capacity factors of 90%. The CANDU reactor design has the ability to refuel on line, as a result (a) it can be a challenge scheduling all required valve testing into limited duration outage work windows, (b) at multi unit sites, Unit 0 valves can be difficult to test because they are rarely ever out of service, (c) deuterium-oxide (heavy water) moderator is expensive to manufacture, as a result, effective through valve leakage monitoring is essential. These three factors alone make CANDU sites the most suitable candidates for on line valve monitoring systems. Nuclear industry regulations have been instrumental in the development of 'at the valve' diagnostic systems, but diagnostic testing has not typically been utilized to the same degree in other less regulated industries. However, that trend is changing, and the move toward valve diagnostics and condition monitoring has moved fastest in the offshore oil and gas industry on the Norwegian side of the North Sea. The Ormen Lange plant, located on Nyhamna Island on the west coast of Norway, operated by Shell, is one of the worlds most advanced gas processing plants. A stated maintenance goal for the plant is that 70% of the maintenance budget and spend should be based on the results of on line condition monitoring, utilizing monitoring systems equipped with switch sensing, strain gages, hydraulic and pneumatic pressure transducers and

  7. On-line valve monitoring at the Ormen Lange gas plant

    International Nuclear Information System (INIS)

    Greenlees, R.; Hale, S.

    2011-01-01

    The purpose of this presentation is to discuss replacing time and labor intensive nuclear outage activities with on line condition monitoring solutions, primarily the periodic verification of MOV functionality discussed in USNRC Generic Letter 96.05. This regulation requires that MOV age related performance degradations are properly identified and accounted for, causing utilities to have to retest valves periodically for the duration of the plants operating license. AECL designed CANDU reactors have a world class performance and safety record, with typical average annual capacity factors of 90%. The CANDU reactor design has the ability to refuel on line, as a result (a) it can be a challenge scheduling all required valve testing into limited duration outage work windows, (b) at multi unit sites, Unit 0 valves can be difficult to test because they are rarely ever out of service, (c) deuterium-oxide (heavy water) moderator is expensive to manufacture, as a result, effective through valve leakage monitoring is essential. These three factors alone make CANDU sites the most suitable candidates for on line valve monitoring systems. Nuclear industry regulations have been instrumental in the development of 'at the valve' diagnostic systems, but diagnostic testing has not typically been utilized to the same degree in other less regulated industries. However, that trend is changing, and the move toward valve diagnostics and condition monitoring has moved fastest in the offshore oil and gas industry on the Norwegian side of the North Sea. The Ormen Lange plant, located on Nyhamna Island on the west coast of Norway, operated by Shell, is one of the worlds most advanced gas processing plants. A stated maintenance goal for the plant is that 70% of the maintenance budget and spend should be based on the results of on line condition monitoring, utilizing monitoring systems equipped with switch sensing, strain gages, hydraulic and pneumatic pressure transducers and acoustic leakage

  8. US gas line contract carriage on the rise

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that the Interstate Natural Gas Association of America reports contract carriage moved 84% of the gas delivered to U.S. markets in 1991, up from 79% the previous year. Carriage for market transportation for distributors, end users, and marketers totaled 15.2 quadrillion BTU, a 13% increase from the 13.4 quads reported at the end of 1990. Ingaa the growth in carriage volumes has slowed. This year's 13% increase is lower than the 28% growth in carriage volumes from 1988 to 1989 and the 72% from 1986 to 1987. Total natural gas delivered to market was 18 quads in 1991, an increase of 5% from the 1990 level of 17.1 quads. Pipeline sales accounted for only 16% of the gas delivered to market in 1991. They dropped 0.8 quads, or 22%, from 1990 levels. Ingaa the while the market relies heavily on carriage throughout the year, reliance on carriage is somewhat heavier as has been the case since 1986 during the off peak season in April-September

  9. On-line gas chemistry experiments with trans actinide elements

    International Nuclear Information System (INIS)

    Turler, A.; Gaguller, B.; Jost, D.T.

    1993-01-01

    The latest achievements in the gas phase chemistry studies of elements 104 and 105 and their lighter homologs are reviewed. Experimental techniques employed in the studies are described. Experimental data on chlorides and bromides of the groups 4, 5 elements and elements 104, 105 are compared with their theoretically predicted chemical properties. 45 refs

  10. Coronal Physics and the Chandra Emission Line Project

    Science.gov (United States)

    Brickhouse, N. S.; Drake, J. J.

    2000-01-01

    With the launch of the Chandra X-ray Observatory, high resolution X-ray spectroscopy of cosmic sources has begun. Early, deep observations of three stellar coronal sources Capella, Procyon, and HR 1099 are providing not only invaluable calibration data, but also benchmarks for plasma spectral models. These models are needed to interpret data from stellar coronae, galaxies and clusters of galaxies, supernova, remnants and other astrophysical sources. They have been called into question in recent years as problems with understanding low resolution ASCA and moderate resolution Extreme Ultraviolet Explorer Satellite (EUVE) data have arisen. The Emission Line Project is a collaborative effort, to improve the models, with Phase I being the comparison of models with observed spectra of Capella, Procyon, and HR 1099. Goals of these comparisons are (1) to determine and verify accurate and robust diagnostics and (2) to identify and prioritize issues in fundamental spectroscopy which will require further theoretical and/or laboratory work. A critical issue in exploiting the coronal data for these purposes is to understand the extent, to which common simplifying assumptions (coronal equilibrium, negligible optical depth) apply. We will discuss recent, advances in our understanding of stellar coronae, in this context.

  11. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  12. On-line sample treatment - Capillary gas chromatography

    NARCIS (Netherlands)

    Goosens, EC; de Jong, D; de Jong, GJ; Brinkman, UAT

    Sample pretreatment is often the bottleneck of a trace level analytical procedure. In order to increase performance, increasing attention is therefore being devoted to combining sample pretreatment on-line with the separation technique that has to be used. In the present review, a variety of

  13. ALICE TPC gas system is the first of the LHC experiments to be put on line

    CERN Document Server

    Maximilien Brice

    2006-01-01

    Picture 01 : the Physics Department's DT1 gas systems team in their laboratory. Picture 02 : Chilo Garabatos (ALICE) and Stefan Haider (PH-DT1-GS) in front of the gas system for the ALICE TPC which has just been put on line.

  14. Long-term projections for electricity and gas prices

    International Nuclear Information System (INIS)

    Borggrefe, Frieder; Lochner, Stefan

    2009-01-01

    The article analyses potential developments of wholesale electricity prices in Germany until 2030. The relevant determinants and their effects on prices are shown. Several projections demonstrate the impact of future fuel prices taking the political framework into account. The importance of carbon and gas prices - and the latter's relationship to oil prices - are discussed extensively. Although forecasting electricity prices is associated with great uncertainties, the article illustrates the relative impacts of the various price determinants and their interactions. (orig.)

  15. THE SLOAN DIGITAL SKY SURVEY REVERBERATION MAPPING PROJECT: RAPID C iv BROAD ABSORPTION LINE VARIABILITY

    International Nuclear Information System (INIS)

    Grier, C. J.; Brandt, W. N.; Trump, J. R.; Schneider, D. P.; Hall, P. B.; Shen, Yue; Vivek, M.; Dawson, K. S.; Ak, N. Filiz; Chen, Yuguang; Denney, K. D.; Kochanek, C. S.; Peterson, B. M.; Green, Paul J.; Jiang, Linhua; McGreer, Ian D.; Pâris, I.; Tao, Charling; Wood-Vasey, W. M.; Bizyaev, Dmitry

    2015-01-01

    We report the discovery of rapid variations of a high-velocity C iv broad absorption line trough in the quasar SDSS J141007.74+541203.3. This object was intensively observed in 2014 as a part of the Sloan Digital Sky Survey Reverberation Mapping Project, during which 32 epochs of spectroscopy were obtained with the Baryon Oscillation Spectroscopic Survey spectrograph. We observe significant (>4σ) variability in the equivalent width (EW) of the broad (∼4000 km s −1 wide) C iv trough on rest-frame timescales as short as 1.20 days (∼29 hr), the shortest broad absorption line variability timescale yet reported. The EW varied by ∼10% on these short timescales, and by about a factor of two over the duration of the campaign. We evaluate several potential causes of the variability, concluding that the most likely cause is a rapid response to changes in the incident ionizing continuum. If the outflow is at a radius where the recombination rate is higher than the ionization rate, the timescale of variability places a lower limit on the density of the absorbing gas of n e ≳ 3.9 × 10 5 cm −3 . The broad absorption line variability characteristics of this quasar are consistent with those observed in previous studies of quasars, indicating that such short-term variability may in fact be common and thus can be used to learn about outflow characteristics and contributions to quasar/host-galaxy feedback scenarios

  16. Windscale advanced gas-cooled reactor (WAGR) decommissioning project overview

    International Nuclear Information System (INIS)

    Pattinson, A.

    2003-01-01

    The current BNFL reactor decommissioning projects are presented. The projects concern power reactor sites at Berkely, Trawsfynydd, Hunterstone, Bradwell, Hinkley Point; UKAEA Windscale Pile 1; Research reactors within UK Scottish Universities at East Kilbride and ICI (both complete); WAGR. The BNFL environmental role include contract management; effective dismantling strategy development; implementation and operation; sentencing, encapsulation and transportation of waste. In addition for the own sites it includes strategy development; baseline decommissioning planning; site management and regulator interface. The project objectives for the Windscale Advanced Gas-Cooled Reactor (WAGR) are 1) Safe and efficient decommissioning; 2) Building of good relationships with customer; 3) Completion of reactor decommissioning in 2005. The completed WAGR decommissioning campaigns are: Operational Waste; Hot Box; Loop Tubes; Neutron Shield; Graphite Core and Restrain System; Thermal Shield. The current campaign is Lower Structures and the remaining are: Pressure vessel and Insulation; Thermal Columns and Outer Vault Membrane. An overview of each campaign is presented

  17. Overview of DOE Oil and Gas Field Laboratory Projects

    Science.gov (United States)

    Bromhal, G.; Ciferno, J.; Covatch, G.; Folio, E.; Melchert, E.; Ogunsola, O.; Renk, J., III; Vagnetti, R.

    2017-12-01

    America's abundant unconventional oil and natural gas (UOG) resources are critical components of our nation's energy portfolio. These resources need to be prudently developed to derive maximum benefits. In spite of the long history of hydraulic fracturing, the optimal number of fracturing stages during multi-stage fracture stimulation in horizontal wells is not known. In addition, there is the dire need of a comprehensive understanding of ways to improve the recovery of shale gas with little or no impacts on the environment. Research that seeks to expand our view of effective and environmentally sustainable ways to develop our nation's oil and natural gas resources can be done in the laboratory or at a computer; but, some experiments must be performed in a field setting. The Department of Energy (DOE) Field Lab Observatory projects are designed to address those research questions that must be studied in the field. The Department of Energy (DOE) is developing a suite of "field laboratory" test sites to carry out collaborative research that will help find ways of improving the recovery of energy resources as much as possible, with as little environmental impact as possible, from "unconventional" formations, such as shale and other low permeability rock formations. Currently there are three field laboratories in various stages of development and operation. Work is on-going at two of the sites: The Hydraulic Fracturing Test Site (HFTS) in the Permian Basin and the Marcellus Shale Energy and Environmental Lab (MSEEL) project in the Marcellus Shale Play. Agreement on the third site, the Utica Shale Energy and Environmental Lab (USEEL) project in the Utica Shale Play, was just recently finalized. Other field site opportunities may be forthcoming. This presentation will give an overview of the three field laboratory projects.

  18. Defining project scenarios for the agile requirements engineering product-line development questionnaire

    OpenAIRE

    Feng, Kunwu; Lempert, Meli; Tang, Yan; Tian, Kun; Cooper, Kendra M.L.; Franch Gutiérrez, Javier

    2007-01-01

    Current agile methods are focused on practices of small, rapid developing and iteration, more people oriented, less documentation projects, and the use of the methods in large, product line projects are somehow difficult. UTD and GESSI have started a project to develop an expert system that can assist a requirements enginer in selecting a requirements engineering process that is well suited for their project, in particular with respect to the use of agile and product line engineering methods....

  19. Natural gas large volumes measurement: going for on-line custody transfer; Medicao de grandes volumes de gas natural: rumo a transferencia de custodia on-line

    Energy Technology Data Exchange (ETDEWEB)

    Mercon, Eduardo G.; Frisoli, Caetano [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    This paper describes the structure of the natural gas flow measurement process in TRANSPETRO, and comments features and performance of existing or under-implantation equipment and systems, reviewing best practices and technology in use. This process runs through three interrelated segments: data flow measurement, strictly speaking; data transfer and acquisition; and data flow measurement certification (data consolidation to invoice). Initially, the work makes an approach to the data flow measurement segment, evaluating technical features of flow meters, and describing configurations and functions of the operating gas flow computers in TRANSPETRO's custody transfer stations. In this part it will also be presented the implantation of TRANSPETRO's system for gas chromatography data input on-line to flow computers. Further, in data transfer and acquisition, SCADA system technical aspects will be evaluated, considering communications protocols and programmable logic controllers functions in remote terminal units, and discussing their places in the measurement process. Additionally, TRANSPETRO's experience in data measurement certification tools is in discussion, as well as new upcoming tools and their potential features, from what new practices will be suggested. Finally, all the work has been conceived and carried out always aiming to the state-of-the-art technology in gas flow measurement: on-line custody transfer. (author)

  20. Waste Energy Recovery from Natural Gas Distribution Network: CELSIUS Project Demonstrator in Genoa

    Directory of Open Access Journals (Sweden)

    Davide Borelli

    2015-12-01

    Full Text Available Increasing energy efficiency by the smart recovery of waste energy is the scope of the CELSIUS Project (Combined Efficient Large Scale Integrated Urban Systems. The CELSIUS consortium includes a world-leading partnership of outstanding research, innovation and implementation organizations, and gather competence and excellence from five European cities with complementary baseline positions regarding the sustainable use of energy: Cologne, Genoa, Gothenburg, London, and Rotterdam. Lasting four-years and coordinated by the City of Gothenburg, the project faces with an holistic approach technical, economic, administrative, social, legal and political issues concerning smart district heating and cooling, aiming to establish best practice solutions. This will be done through the implementation of twelve new high-reaching demonstration projects, which cover the most major aspects of innovative urban heating and cooling for a smart city. The Genoa demonstrator was designed in order to recover energy from the pressure drop between the main supply line and the city natural gas network. The potential mechanical energy is converted to electricity by a turboexpander/generator system, which has been integrated in a combined heat and power plant to supply a district heating network. The performed energy analysis assessed natural gas saving and greenhouse gas reduction achieved through the smart systems integration.

  1. Projected uranium measurement uncertainties for the Gas Centrifuge Enrichment Plant

    International Nuclear Information System (INIS)

    Younkin, J.M.

    1979-02-01

    An analysis was made of the uncertainties associated with the measurements of the declared uranium streams in the Portsmouth Gas Centrifuge Enrichment Plant (GCEP). The total uncertainty for the GCEP is projected to be from 54 to 108 kg 235 U/year out of a measured total of 200,000 kg 235 U/year. The systematic component of uncertainty of the UF 6 streams is the largest and the dominant contributor to the total uncertainty. A possible scheme for reducing the total uncertainty is given

  2. Financial structure of Korea Gas Corporation's LNG projects

    International Nuclear Information System (INIS)

    Jeongsoo Ko

    1991-01-01

    When an Indonesian LNG tanker arrived in Korea for the first time in October 1986, Korea became the seventh LNG-consuming nation in the world. The imported LNG has contributed greatly to solving pollution problems and ensuring a stable supply of energy to Korea through the diversification of energy sources. So far, the LNG supply has been confined to the Metropolitan area. The Korea Gas Corporation now plans to expand the LNG supply to cover the entire nation. This paper introduces the experience and future plan of Korea's LNG projects with a special reference to their financial structure

  3. Economic Impact Analysis of Short Line Railroads : Research Project Capsule

    Science.gov (United States)

    2012-10-01

    Rail transportation is of vital : importance to the state of : Louisiana and is a key : component of the states : business infrastructure, supporting agricultural, petroleum, chemical, and manufacturing : industries across the state. Short line (C...

  4. Imaging spectrophotometry of ionized gas in NGC 1068. I - Kinematics of the narrow-line region

    Science.gov (United States)

    Cecil, Gerald; Bland, Jonathan; Tully, R. Brent

    1990-01-01

    The kinematics of collisionally excited forbidden N II 6548, 6583 across the inner 1 arcmin diameter of the nearby Seyfert galaxy NGC 1068 is mapped using an imaging Fabry-Perot interferometer and low-noise CCD. The stack of monochromatic images, which spatially resolved the high-velocity gas, was analyzed for kinematic and photometric content. Profiles agree well with previous long-slit work, and their complete spatial coverage makes it possible to constrain the gas volume distribution. It is found that the narrow-line region is distributed in a thick center-darkened, line-emitting cylinder that envelopes the collimated radio jet. Three distinct kinematic subsystems, of which the cylinder is composed, are discussed in detail. Detailed behavior of the emission-line profiles, at the few points in the NE quadrant with simple kinematics, argues that the ionized gas develops a significant component of motion perpendicular to the jet axis.

  5. Trash to Supply Gas (TtSG) Project Overview

    Science.gov (United States)

    Hintze, Paul; Santiago-Maldonado, Edgardo; Kulis, Michael J.; Lytle, John K.; Fisher, John W.; Vaccaro, Helen; Ewert, Michael K.; Broyan, James L.

    2012-01-01

    Technologies that reduce logistical needs are a key to long term space missions. Currently, trash and waste generated during a mission is carried during the entire roundtrip mission or stored inside a logistic module which is de-orbited into Earth's atmosphere for destruction. The goal of the Trash to Supply Gas (TtSG) project is to develop space technology alternatives for converting trash and other waste materials from human spaceflight into high-value products that might include propellants or power system fuels in addition to life support oxygen and water. In addition to producing a useful product from waste, TtSG will decrease the volume needed to store waste on long term space missions. This paper presents an overview of the TtSG technologies and future plans for the project.

  6. CENTAR gas centrifuge enrichment project: economics and engineering considerations

    International Nuclear Information System (INIS)

    Fishman, A.M.

    1977-01-01

    Description of some economic and engineering considerations of the CENTAR Associates' 3000000 SWU/yr gas centrifuge uranium enrichment plant project. The need for uranium enrichment facilities is discussed, and the advantages of using the centrifuge process rather than the presently used gaseous diffusion process are reviewed. A description of the CENTAR plant is given, highlighting the major features of the facility. Since the centiruges to be used in the plant account for approximately 50% of the capital cost of the project, the philosophy of their manufacture and procurement is discussed. Various design considerations which bear upon process economics are presented to give the reader an appreciation of the subtleties of the technology and the flexibility possible in plant design. Special attention is given to meeting the needs of the utility customer at the lowest possible cost

  7. On-Line Enrichment Monitor for UF{sub 6} Gas Centrifuge Enrichment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Ianakiev, K. D.; Boyer, B.; Favalli, A.; Goda, J. M.; Hill, T.; Keller, C.; Lombardi, M.; Paffett, M.; MacArthur, D. W.; McCluskey, C.; Moss, C. E.; Parker, R.; Smith, M. K.; Swinhoe, M. T. [Los Alamos National Laboratory, Los Alamos (United States)

    2012-06-15

    This paper is a continuation of the Advanced Enrichment Monitoring Technology for UF{sub 6} Gas Centrifuge Enrichment Plant (GCEP) work, presented in the 2010 IAEA Safeguards Symposium. Here we will present the system architecture for a planned side-by-side field trial test of passive (186-keV line spectroscopy and pressure-based correction for UF{sub 6} gas density) and active (186-keV line spectroscopy and transmission measurement based correction for UF{sub 6} gas density) enrichment monitoring systems in URENCO's enrichment plant in Capenhurst. Because the pressure and transmission measurements of UF{sub 6} are complementary, additional information on the importance of the presence of light gases and the UF{sub 6} gas temperature can be obtained by cross-correlation between simultaneous measurements of transmission, pressure and 186-keV intensity. We will discuss the calibration issues and performance in the context of accurate, on-line enrichment measurement. It is hoped that a simple and accurate on-line enrichment monitor can be built using the UF{sub 6} gas pressure provided by the Operator, based on online mass spectrometer calibration, assuming a negligible (a small fraction of percent) contribution of wall deposits. Unaccounted-for wall deposits present at the initial calibration will lead to unwanted sensitivity to changes in theUF{sub 6} gas pressure and thus to error in the enrichment results. Because the accumulated deposits in the cascade header pipe have been identified as an issue for Go/No Go measurements with the Cascade Header Enrichment Monitor (CHEM) and Continuous Enrichment Monitor (CEMO), it is important to explore their effect. Therefore we present the expected uncertainty on enrichment measurements obtained by propagating the errors introduced by deposits, gas density, etc. and will discuss the options for a deposit correction during initial calibration of an On-Line Enrichment Monitor (OLEM).

  8. Assessing Embodied Energy and Greenhouse Gas Emissions in Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Jan Krantz

    2015-10-01

    Full Text Available Greenhouse gas (GHG emissions from construction processes are a serious concern globally. Of the several approaches taken to assess emissions, Life Cycle Assessment (LCA based methods do not just take into account the construction phase, but consider all phases of the life cycle of the construction. However, many current LCA approaches make general assumptions regarding location and effects, which do not do justice to the inherent dynamics of normal construction projects. This study presents a model to assess the embodied energy and associated GHG emissions, which is specifically adapted to address the dynamics of infrastructure construction projects. The use of the model is demonstrated on the superstructure of a prefabricated bridge. The findings indicate that Building Information Models/Modeling (BIM and Discrete Event Simulation (DES can be used to efficiently generate project-specific data, which is needed for estimating the embodied energy and associated GHG emissions in construction settings. This study has implications for the advancement of LCA-based methods (as well as project management as a way of assessing embodied energy and associated GHG emissions related to construction.

  9. Projections of demand of natural gas in Mexico; Proyecciones de demanda de gas natural en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Quintanilla Martinez, Juan [Programa Universitario de Energia, UNAM (Mexico)

    1996-07-01

    The projections of demand of energy for Mexico, in the global and regional scope, for period 1992-2020 are presented. The projections are based on the use of a simulation model built in the University Program of Energy of the Universidad Nacional Autonoma de Mexico (UNAM), which allows to project the demand in the short and medium term of the primary and final energy. Projections of the demands of energy or for fuels by sectors and subsectors are obtained in accordance with different scenarios of growth. Particularly the demand of natural gas is analyzed, both, as energy and as raw material for the petrochemical industry, and as fuel oil, under different scenarios of economic growth and policies of environmental character. [Spanish] Se presentan las proyecciones de demanda de energia para Mexico, en el ambito global y regional, para el periodo 1992-2020. Las proyecciones estan basadas en el uso de un modelo de simulacion construido en el Programa Universitario de Energia de la Universidad Nacional Autonoma de Mexico (UNAM), el cual permite proyectar la demanda de energia primaria y final en el corto y mediano plazos. Se obtienen proyecciones de las demandas de energia por sectores y subsectores o por combustibles de acuerdo con diferentes escenarios de crecimiento. En particular se analiza la demanda de gas natural, tanto como energetico como materia prima para la petroquimica, y combustoleo bajo diferentes escenarios de crecimiento economico y politicas de caracter ambiental.

  10. New projects developed by COMOTI in gas industry

    Science.gov (United States)

    Nitulescu, Marian; Silivestru, Valentin; Toma, Niculae; Slujitoru, Cristian; Petrescu, Valentin; Leahu, Mihai; Oniga, Ciprian; Ulici, Gheorghe

    2015-08-01

    The paper aims to present two new projects developed by the Romanian Research and Development Institute for Gas Turbines (COMOTI) in partnership with City University of London and GHH-Rand Germany, in the field of screw compressors/expanders. COMOTI passed, in recent years, from being a GHH-Rand licensed manufacturer for a range of oil-injected screw compressors, of CU type, to a new phase of range diversification, approaching screw compressors with a maximum discharge pressure of 45 bara. So, in cooperation with City University and GHH-Rand we design, manufacture and test, with air, in COMOTI test bench the new type of screw compressor named CHP 220. Also, the cooperation with GHH-Rand has resulted in the design, manufacture and air testing on the test bench, and then gas testing - in a gas compression station - for an electric generator driven by a screw expander. This paper presents how the tests were carried out, the experimental data and the interpretation of results

  11. Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

    Science.gov (United States)

    Khadem, Mohammad Miftaur Rahman Khan; Piya, Sujan; Shamsuzzoha, Ahm

    2017-09-01

    The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interviews. These data were then translated into numerical values based on the expert's opinion. Further, the numerical data were used as an input to Monte Carlo simulation. RiskyProject Professional™ software was used to simulate the system based on the identified risks. The simulation result predicted a delay of about 2 years as a worse case with no chance of meeting the project's on stream date. Also, it has predicted 8% chance of exceeding the total estimated budget. The result of numerical analysis from the proposed model is validated by comparing it with the result of qualitative analysis, which was obtained through discussion with various project managers of company.

  12. Carcinogenicity of Mustard Gas: Report of the Cancer Registry Project Among Mustard Gas Exposed Iranian Veterans

    International Nuclear Information System (INIS)

    Soroush, M. R.

    2007-01-01

    Since 2003 The Janbazan Medical and Engineering Research Center in collaboration with Tehran University has conducted a nationwide cancer registry project among all Iranian Veterans with history of exposure to mustard gas during 1980-1988 Iran Iraq war. The mixed cohort study has a retrospective phase from the exposure time to 2003 and a prospective phase from 2003 to 2013. The main goal is to find any possible relationship between exposure to mustard gas and developing cancer as a long term health effect. A total number of 7500 individual (both military and civilians) with confirmed medical records of exposure to mustard gas have been included in the study to be compared with the same number of control population as well as the statistics of the national cancer registry system. The follow up of all cases is being done as a part of the national health monitoring program of the Janbazan (veterans) organization. In this report the latest findings of this project will be presented.(author)

  13. 75 FR 8245 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2010-02-24

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 18, 2010. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: This final..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy Projects...

  14. THE SLOAN DIGITAL SKY SURVEY REVERBERATION MAPPING PROJECT: RAPID C iv BROAD ABSORPTION LINE VARIABILITY

    Energy Technology Data Exchange (ETDEWEB)

    Grier, C. J.; Brandt, W. N.; Trump, J. R.; Schneider, D. P. [Department of Astronomy and Astrophysics and Institute for Gravitation and the Cosmos, The Pennsylvania State University, 525 Davey Laboratory, University Park, PA 16802 (United States); Hall, P. B. [Department of Physics and Astronomy, York University, Toronto, ON M3J 1P3 (Canada); Shen, Yue [Carnegie Observatories, 813 Santa Barbara Street, Pasadena, CA 91101 (United States); Vivek, M.; Dawson, K. S. [Department of Physics and Astronomy, University of Utah, Salt Lake City, UT 84112 (United States); Ak, N. Filiz [Faculty of Sciences, Department of Astronomy and Space Sciences, Erciyes University, 38039 Kayseri (Turkey); Chen, Yuguang [Department of Astronomy, School of Physics, Peking University, Beijing 100871 (China); Denney, K. D.; Kochanek, C. S.; Peterson, B. M. [Department of Astronomy, The Ohio State University, 140 West 18th Avenue, Columbus, OH 43210 (United States); Green, Paul J. [Harvard-Smithsonian Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States); Jiang, Linhua [Kavli Institute for Astronomy and Astrophysics, Peking University, Beijing 100871 (China); McGreer, Ian D. [Steward Observatory, The University of Arizona, 933 North Cherry Avenue, Tucson, AZ 85721-0065 (United States); Pâris, I. [INAF-Osservatorio Astronomico di Trieste, Via G. B. Tiepolo 11, I-34131 Trieste (Italy); Tao, Charling [Centre de Physique des Particules de Marseille, Aix-Marseille Universite, CNRS /IN2P3, 163, avenue de Luminy, Case 902, F-13288 Marseille Cedex 09 (France); Wood-Vasey, W. M. [PITT PACC, Department of Physics and Astronomy, University of Pittsburgh, 3941 O’Hara Street, Pittsburgh, PA 15260 (United States); Bizyaev, Dmitry, E-mail: grier@psu.edu [Apache Point Observatory and New Mexico State University, P.O. Box 59, Sunspot, NM, 88349-0059 (United States); and others

    2015-06-10

    We report the discovery of rapid variations of a high-velocity C iv broad absorption line trough in the quasar SDSS J141007.74+541203.3. This object was intensively observed in 2014 as a part of the Sloan Digital Sky Survey Reverberation Mapping Project, during which 32 epochs of spectroscopy were obtained with the Baryon Oscillation Spectroscopic Survey spectrograph. We observe significant (>4σ) variability in the equivalent width (EW) of the broad (∼4000 km s{sup −1} wide) C iv trough on rest-frame timescales as short as 1.20 days (∼29 hr), the shortest broad absorption line variability timescale yet reported. The EW varied by ∼10% on these short timescales, and by about a factor of two over the duration of the campaign. We evaluate several potential causes of the variability, concluding that the most likely cause is a rapid response to changes in the incident ionizing continuum. If the outflow is at a radius where the recombination rate is higher than the ionization rate, the timescale of variability places a lower limit on the density of the absorbing gas of n{sub e} ≳ 3.9 × 10{sup 5} cm{sup −3}. The broad absorption line variability characteristics of this quasar are consistent with those observed in previous studies of quasars, indicating that such short-term variability may in fact be common and thus can be used to learn about outflow characteristics and contributions to quasar/host-galaxy feedback scenarios.

  15. Teaching Project Management On-Line: Lessons Learned from MOOCs

    Science.gov (United States)

    Falcao, Rita; Fernandes, Luis

    2016-01-01

    Creating a course for teaching project management online in a full online distance-learning environment was a challenge. Working with adult learners from different continents that want to complete a Master degree was an additional challenge. This paper describes how different MOOCs were used to learn about teaching -(meta) e-learning. MOOCs…

  16. Fuel strategies for natural gas fired cogeneration and IPP projects

    International Nuclear Information System (INIS)

    Gottlieb, J.W.

    1992-01-01

    This paper as published is the outline of a presentation on managing the risk of varying fuel costs as part of a successful fuel strategy for natural gas fired cogeneration and Independent Power Producer (IPP) projects. So long as the fuel cost that electric utilities recover from their ratepayers differs from the fuel costs incurred by IPP and Qualifying Facility (QF) plant operators, the largest variable cost risk of any QF or IPP will continue to be the cost of fuel. Managing that risk is the mission of any successful fuel procurement strategy. Unfortunately, a quick review of the last 20 years in the oil and gas industry reveals dramatic and substantial changes in price and fuel availability that few, if any, industry experts could have predicted in 1971. Recognizing that the fuel cost risk to a QF or IPP investor also spans a 20 year period, the typical term of a QF or IPP power purchase contract, a successful fuel procurement strategy must consider and address the likelihood of future changes. Due to federal and state regulatory changes made from 1978 to 1989, the current structure of the oil and gas industry appears to provide end-users with the tools to improve the manageability of fuel cost risks. QF and IPP developers can choose the type of service they desire and can negotiate most of the contractual elements of that service. Until electric utilities are allowed to flow through their rates the fuel costs incurred by QFs and IPPs, a thorough analysis of the available fuel procurement options prior to development of a QF or IPP will continue to be absolutely necessary

  17. Increasing of MERARG experimental performances: on-line fission gas release measurement by mass spectrometry

    Energy Technology Data Exchange (ETDEWEB)

    Pontillon, Y.; Capdevila, H.; Clement, S. [CEA, DEN, DEC, SA3C, LAMIR, F-13108 Saint Paul lez Durance, (France); Guigues, E.; Janulyte, A.; Zerega, Y.; Andre, J. [Aix-Marseille Universite, LISA EA 4672, 13397 MARSEILLE cedex 20, (France)

    2015-07-01

    The MERARG device - implemented at the LECASTAR Hot Laboratory, at the CEA Cadarache - allows characterizing nuclear fuels with respect to the behaviour of fission gases during thermal transients representative of normal or off normal operating nuclear power plant conditions. The fuel is heated in order to extract a part or the total gas inventory it contains. Fission Gas Release (FGR) is actually recorded by mean of both on-line gamma spectrometry station and micro gas chromatography. These two devices monitor the quantity and kinetics of fission gas release rate. They only address {sup 85}Kr radioactive isotope and the elemental quantification of Kr, Xe and He (with a relatively low detection limit in the latter case, typically 5-10 ppm). In order to better estimate the basic mechanisms that promote fission gas release from irradiated nuclear fuels, the CEA fuel study department decided to improve its experimental facility by modifying MERARG to extend the studies of gamma emitter fission gases to all gases (including Helium) with a complete isotopic distribution capability. To match these specifications, a Residual Gas Analyser (RGA) has been chosen as mass spectrometer. This paper presents a review of the main aspects of the qualification/calibration phase of the RGA type analyser. In particular, results recorded over three mass ranges 1-10 u, 80-90 u and 120-140 u in the two classical modes of MERARG, i.e. on-line and off-line measurements are discussed. Results obtained from a standard gas bottle show that the quantitative analysis at a few ppm levels can be achieved for all isotopes of Kr and Xe, as well as masses 2 and 4 u. (authors)

  18. Western Gas Sands Project. Status report, 1 January 1979--31 January 1979

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C H

    1979-01-01

    Aim is to increase gas production from the low-permeability gas sands of the western U.S. Progress is reported on: project management, resource assessment, R and D at various facilities, and field tests and demonstrations. (DLC)

  19. Project to support formation of an energy and environment technology demonstration project in fiscal 1999. International joint demonstration and research project (Sichuan Province natural gas DME project); 1999 nendo Shisensho tennen gas DME project seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    DME can be manufactured from such raw materials as natural gas, coal bed gas and coal. NKK who is developing a technology to synthesize efficiently the DME being a new energy has been commissioned from NEDO to investigate and study a project to manufacture DME using natural gas produced in Sinchuan Province, and utilize it as fuel for power generation, transportation and LPG substitution. In the present research, the DME manufacturing plant size was assumed to be 500 tons a day (165 x 10{sup 3} tons annually). This output nearly corresponds to the current LPG consumption. The required amount of natural gas as the raw material is 0.2 x 10{sup 9} Nm{sup 3}/year, wherein, since the total production quantity of natural gas in Sinchuan Province is 10 x 10{sup 9} Nm{sup 3}/year, there is no problem in the supply of natural gas as the raw material. The construction cost was estimated to be 11 billion yen taking into consideration the device fabrication cost and construction labor cost in China. Furthermore, as a result of discussing the economy considering the natural gas material cost, industrial water cost, and labor cost for plant operation, the internal profit rate for the total capital after tax was found a little over 10%, proving the project to have excellent economic performance. (NEDO)

  20. The outlook for natural gas markets in the GRI baseline projection

    International Nuclear Information System (INIS)

    Holtberg, P.D.

    1990-01-01

    Gas Research Institute is an independent, not-for-profit organization that plans, manages, and develops financing for a cooperative research and development program for the mutual benefit of the natural gas industry and its customers. The research program consists of over 500 active research projects in natural gas supply and end use, and in gas industry operations, as well as related basic research. This paper summarizes the U.S. natural gas demand and supply outlook projected in a preliminary version of the 191 edition of the GRI Baseline Projection of U.S. Energy Supply and Demand. The projection used for this paper is from an early run of the GRI modeling structure. As such, it is subject to substantial revision before the Baseline Projection is finalized. The paper presents a projection of natural gas demand in the major end-use sectors and the slate of supply sources expected to meet that demand over the period from 1989 to 2010

  1. Reasons for decision in the matter of Enbridge Pipelines Inc. Line 4 Extension Project : facilities[Application dated 28 June 2007 for the Line 4 Extension Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    In June 2007, Enbridge Pipelines Inc. applied for approval to extend Line 4 of its Mainline pipeline upstream from Hardisty to Edmonton, Alberta. The project would relieve a potential bottleneck and would also add an additional line across this segment to increase system security and flexibility. The average annual capacity of Line 4 would be 140,000 cubic metres per day. The Enbridge Mainline from Edmonton to Hardisty currently includes 3 oil pipelines, while the Enbridge Mainline downstream of Hardisty includes 4 oil pipelines. This document presented the views of the Board regarding the construction and operation of the project facilities; public and Aboriginal consultation; environmental and socio-economic matters; land matters; tolls and tariffs; and, supply, markets, financing and economics. The Board noted that the benefits of this project outweigh the burdens associated with it. The project required an environmental assessment under the Canadian Environmental Assessment Act which found that it is not likely to cause significant adverse environmental effects. In its approval of the project, the Board attached 15 conditions, including a requirement for Enbridge to file an updated Environmental Protection Plan for the Board's approval. The Board also approved Enbridge's application for its tolling method and to reactivate 3 sections of pre-existing pipeline. 3 tabs., 3 figs., 3 appendices.

  2. Projection methods for line radiative transfer in spherical media.

    Science.gov (United States)

    Anusha, L. S.; Nagendra, K. N.

    An efficient numerical method called the Preconditioned Bi-Conjugate Gradient (Pre-BiCG) method is presented for the solution of radiative transfer equation in spherical geometry. A variant of this method called Stabilized Preconditioned Bi-Conjugate Gradient (Pre-BiCG-STAB) is also presented. These methods are based on projections on the subspaces of the n dimensional Euclidean space mathbb {R}n called Krylov subspaces. The methods are shown to be faster in terms of convergence rate compared to the contemporary iterative methods such as Jacobi, Gauss-Seidel and Successive Over Relaxation (SOR).

  3. Continuous determination of volatile products in anaerobic fermenters by on-line capillary gas chromatography

    International Nuclear Information System (INIS)

    Diamantis, V.; Melidis, P.; Aivasidis, A.

    2006-01-01

    Bio-ethanol and biogas produced during the anaerobic conversion of organic compounds has been a subject of great interest since the oil crisis of the 1970s. In ethanol fermentation and anaerobic treatment of wastewaters, end-product (ethanol) and intermediate-products (short-chain fatty acids, SCFA) cause inhibition that results in reduced process efficiency. Control of these constituents is of utmost importance for bioreactor optimization and process stability. Ethanol and SCFA can be detected with precision by capillary gas chromatography usually conducted in off-line measurements. In this work, an on-line monitoring and controlling system was developed and connected to the fermenter via an auto-sampling equipment, which could perform the feeding, filtration and dilution of the sample and final injection into the gas chromatograph through an automation-based programmed procedure. The sample was continuously pumped from the recycle stream of the bioreactor and treated using a microfiltration unit. The concentrate was returned to the reactor while the permeate was quantitatively mixed with an internal standard solution. The system comprised of a gas chromatograph with the flow cell and one-shot sampler and a PC with the appropriate software. The on-line measurement of ethanol and SCFA, directly from the liquid phase of an ethanol fermenter and a high-rate continuous mode anaerobic digester, was accomplished by gas chromatography. Also, this monitoring and controlling system was proved to be effective in the continuous fermentation of alcohol-free beer

  4. Outflow Kinematics Manifested by the Hα Line: Gas Outflows in Type 2 AGNs. IV

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Daeun; Woo, Jong-Hak; Bae, Hyun-Jin, E-mail: woo@astro.snu.ac.kr [Astronomy Program, Department of Physics and Astronomy, Seoul National University, Seoul 151-742 (Korea, Republic of)

    2017-08-20

    Energetic ionized gas outflows driven by active galactic nuclei (AGNs) have been studied as a key phenomenon related to AGN feedback. To probe the kinematics of the gas in the narrow-line region, [O iii] λ 5007 has been utilized in a number of studies showing nonvirial kinematic properties due to AGN outflows. In this paper, we statistically investigate whether the H α emission line is influenced by AGN-driven outflows by measuring the kinematic properties based on the H α line profile and comparing them with those of [O iii]. Using the spatially integrated spectra of ∼37,000 Type 2 AGNs at z < 0.3 selected from the Sloan Digital Sky Survey DR7, we find a nonlinear correlation between H α velocity dispersion and stellar velocity dispersion that reveals the presence of the nongravitational component, especially for AGNs with a wing component in H α . The large H α velocity dispersion and velocity shift of luminous AGNs are clear evidence of AGN outflow impacts on hydrogen gas, while relatively smaller kinematic properties compared to those of [O iii] imply that the observed outflow effect on the H α line is weaker than the case of [O iii].

  5. K Basin sandfilter backwash line characterization project, analytical results for Campaign 20

    International Nuclear Information System (INIS)

    STEEN, F.H.

    1999-01-01

    Sample 112KWBMF was taken from the K West Sandfilter Backwash Pit on June 1 , 1999, and received by 222-S Laboratory on June 2,1999. Analyses were performed on sample 112KWBMF in accordance with Letter of Instruction for K Basins Sandfilter Backwash Line Samples (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project

  6. K basin sandfilter backwash line characterization project, analytical results for campaign 15

    International Nuclear Information System (INIS)

    Steen, F.H.

    1999-01-01

    Sample 183KWBMF was taken from the K West Sandfilter Backwash Pit on August 28, 1998 and received by 222-S Laboratory on August 28, 1998. Analyses were performed in accordance with ''Letter of Instruction for K Basins Sandfilter Backwash Line Samples'' (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project

  7. The 12th 735-kV transmission line project: Hydro-Quebec network

    International Nuclear Information System (INIS)

    1992-01-01

    Hydro-Quebec is proposing to construct a 735-kV transmission line from the Chissibi station near the LG3 hydroelectric power plant to the Jacques-Cartier station near Quebec City. The width of the right-of-way will generally be 90 m and it is intended to install the line in two stages. The Chissibi-Chibougamau section should enter service in 1993 and the Chibougamau-Cartier section in 1994. The cost of the line is estimated at $1.21 billion, of which $900 million is for line construction and $310 million for station equipment. Prospective corridors for the line route have been selected, portions of which enable twinning with Hydro-Quebec's existing 9th 735-kV line. A series of hearings on the environmental and other impacts of the power line project was held by the Bureau d'audiences publiques sur l'environnement and results are summarized along with the views of the Bureau. The summary describes the justification for the project, the choice of the transmission line route, the evaluation of the impacts of the project on the natural and human environments, health effects due to magnetic fields, and effects on the economic development of northern Quebec. Recommendations are given for mitigating the impacts of the project. 13 refs., 8 figs., 2 tabs

  8. K Basin Sandfilter Backwash Line Characterization Project and Analytical Results for Campaign 24

    International Nuclear Information System (INIS)

    STEEN, F.H.

    1999-01-01

    Sample 203KWBMF was taken from the K West Sandfilter Backwash Pit on November 4, 1999 and received by 2224 Laboratory on November 4, 1999. Analyses were performed on sample 203KWBMF in accordance with ''Letter of Instruction for K Basins sandfilter Backwash Line Samples'' (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project

  9. Spherical Projection Based Straight Line Segment Extraction for Single Station Terrestrial Laser Point Cloud

    Directory of Open Access Journals (Sweden)

    ZHANG Fan

    2015-06-01

    Full Text Available Due to the discrete distribution computing errors and lack of adaptability are ubiquitous in the current straight line extraction for TLS data methods. A 3D straight line segment extraction method is proposed based on spherical projection for single station terrestrial laser point clouds. Firstly, horizontal and vertical angles of each laser point are calculated by means of spherical coordinates, intensity panoramic image according to the two angles is generated. Secondly, edges which include straight line features are detected from intensity panoramic image by using of edge detection algorithm. Thirdly, great circles are detected from edges of panoramic image using spherical Hough transform. According to the axiom that a straight line segment in 3D space is a spherical great circle after spherical projection, detecting great circles from spherical projected data sets is essentially detecting straight line segments from 3D data sets without spherical projection. Finally, a robust 3D straight line fitting method is employed to fitting the straight lines and calculating parameters of the straight line segments. Experiments using different data sets and comparison with other methods show the accuracy and applicability of the proposed method.

  10. International strategies for growth : monetizing gas reserves to add value to the bottom line

    International Nuclear Information System (INIS)

    Mihaichuk, G.

    1998-01-01

    The direction taken by oil and gas companies, including TransCanada International, in their strategy for growth in global energy markets was discussed. The role that gas plays in meeting the objectives was examined and the different ways in which gas reserves and investments in the gas sector are being turned into high-performing vehicles for adding value to the bottom line were described. Deregulation of, and competition within, the gas and electric power industries are the driving factors for changes within the energy industries. Natural gas will be a winner because it is the first choice for new power generation. Many companies have entered the international playing field to take advantage of the opportunities in international markets. The problems and solutions to monetizing natural gas reserves, some of the international political issues such as regulatory uncertainty, cross-border disputes, lack of regional integration, and sanctions, and how these adverse effects may be mitigated through mergers, acquisitions, or joint ventures, are explored. 14 figs

  11. A 110 m long prototype helium transfer line for the HERA project

    International Nuclear Information System (INIS)

    Horvath, I.; Ming, P.; Von Burg, M.; Horlitz, G.; Sindt, H.

    1986-01-01

    A prototype helium transfer line of 110-m length was designed and constructed at SIN for the HERA project. This rendered a study of the assembly and handling processes as well as the determination of the heat losses into the transfer line. In this paper the transfer line structure is described and first results of heat transfer measurement for the specially developed super-insulation are presented

  12. LINES

    Directory of Open Access Journals (Sweden)

    Minas Bakalchev

    2015-10-01

    Full Text Available The perception of elements in a system often creates their interdependence, interconditionality, and suppression. The lines from a basic geometrical element have become the model of a reductive world based on isolation according to certain criteria such as function, structure, and social organization. Their traces are experienced in the contemporary world as fragments or ruins of a system of domination of an assumed hierarchical unity. How can one release oneself from such dependence or determinism? How can the lines become less “systematic” and forms more autonomous, and less reductive? How is a form released from modernistic determinism on the new controversial ground? How can these elements or forms of representation become forms of action in the present complex world? In this paper, the meaning of lines through the ideas of Le Corbusier, Leonidov, Picasso, and Hitchcock is presented. Spatial research was made through a series of examples arising from the projects of the architectural studio “Residential Transformations”, which was a backbone for mapping the possibilities ranging from playfulness to exactness, as tactics of transformation in the different contexts of the contemporary world.

  13. Possibilities of Mercury Removal in the Dry Flue Gas Cleaning Lines of Solid Waste Incineration Units

    Czech Academy of Sciences Publication Activity Database

    Svoboda, Karel; Hartman, Miloslav; Šyc, Michal; Pohořelý, Michael; Kameníková, Petra; Jeremiáš, Michal; Durda, Tomáš

    2016-01-01

    Roč. 166, JAN 15 (2016), s. 499-511 ISSN 0301-4797 R&D Projects: GA TA ČR TE02000236 Institutional support: RVO:67985858 Keywords : waste incineration * mercury removal * flue gas Subject RIV: CI - Industrial Chemistry, Chemical Engineering Impact factor: 4.010, year: 2016

  14. Safeguarding public values in gas infrastructure expansion. A comparison of two investment projects

    International Nuclear Information System (INIS)

    De Joode, J.

    2007-02-01

    The realisation of new gas infrastructure projects affects overall gas market performance with respect to the public values of affordability and security of supply. However, the actual contribution of a gas infrastructure expansion project to system affordability and security of supply depends upon the institutional design of the market (legislation, regulatory codes and arrangements, market rules, etc.). In this paper we link the institutional design applicable to two specific gas infrastructure projects with the safeguarding of the aforementioned public values. We conclude that path dependencies can cause large differences in the contribution of the projects to the safeguarding of public values

  15. Impacts of Mackenzie gas project on water supply systems of northern communities : Fort Simpson as a case study

    International Nuclear Information System (INIS)

    Mathrani, M.; Johnson, K.

    2007-01-01

    The proposed Mackenzie Gas Project (MGP) is a 1220-kilometre natural gas pipeline system along the Mackenzie Valley of Canada's Northwest Territories. The line will connect northern onshore gas fields with North American markets. Four major Canadian oil and gas companies and a group representing the Aboriginal peoples of Canada's Northwest Territories are partners in the proposed MGP. The MGP is currently in the project definition stage that involves examining the effect of the project on northern communities. Fort Simpson is located on an island, on the forks of the Mackenzie and Liard Rivers and is proposed as the major route for the MGP with the construction of barge handling areas, storage areas, camps/housing units and use of air and highway facilities. These activities are expected to result in burden on local civil infrastructure systems including water supply systems. Although the environmental impacts of the project on the community's infrastructure systems are projected by the MGP proponents, the local authority wanted to conduct its own assessment of the impacts on local water supply system. This paper presented the results of a study that examined the amount of water used by the community based upon available water use records and the current operational and maintenance costs based upon available financial documents. The study also estimated future water requirements based upon MGP activities and associated population growth. Current and future economic rates were also determined. 13 refs., 6 tabs

  16. On-line gas mixing and multi-channel distribution system

    International Nuclear Information System (INIS)

    Kalmani, S.D.; Mondal, N.K.; Satyanarayana, B.; Verma, P.; Joshi, Avinash

    2009-01-01

    In this presentation, we describe a mass-flow controller based on-line gas mixing unit with the multi-channel distribution system. We highlight different aspects such as requirement, design, calibration, control and operation of this system. This unit has the capability to mix up to four different input gases and distribute over 16 output channels. Output in individual channels is controlled accurately by using capillary-based system. At present, we are using this gas mixing unit for prototype of iron calorimeter (ICAL) detector of India-based Neutrino Observatory (INO).

  17. China's modern day Great Wall : the 40 inch West to East Gas Pipeline Project

    International Nuclear Information System (INIS)

    Gray, L.A.B.

    2004-01-01

    In order to fuel China's economic growth, PetroChina began construction of the West to East Natural Gas Pipeline Project (WEPP) in 2001 to transport large quantities of natural gas reserves from the Tarim Basin in the Xinjiang Autonomous Region in far western China to markets in eastern China. The WEPP is the first large diameter, cross-country pipeline project ever constructed in China, and was the first to use automatic welding and automatic ultrasonic inspection on pipelines in China. This paper addressed the management, engineering, procurement and construction challenges of the WEPP. Upon completion of the 3,800 km, 1.016 mm mainline pipeline, construction will begin on other major facilities, such 294 km of lateral line, dual fiber optic conduits with the mainline, 1,100 km of access roads, 23 metering stations, 18 pigging stations, 10 compressor stations, 16 mountain tunnels, 16 aerial crossings, 1 crossing of the Yangtze River, 3 crossings of the Yellow River, a gas control center, and SCADA system. Houston-based Universal Ensco Inc. was awarded a contract to perform a feasibility study as well as a construction supervision contract by PetroChina for the WEPP. Universal also designed a gas turbine drive compressor station at Lunnan and an electric drive compressor station at Zhengzhou. This paper demonstrated that business in China for foreign companies in the pipeline industry is evolving and several changes can be expected as the state planned economy is reformed to a free market economy. 4 refs., 5 tabs., 17 figs.

  18. WHT spectroscopy of emission-line gas around two separate quasars at z = 0.87

    International Nuclear Information System (INIS)

    Fabian, A.C.; Crawford, C.S.; Johnstone, R.M.; Hewett, P.C.; Allington-Smith, J.R.

    1988-01-01

    A report is given of observations made with the Faint Object Spectrograph on the 4.2-m William Herschel Telescope (WHT), in which the line emission of the fuzz around two separate quasars, which coincidentally both have redshifts z = 0.87, is detected and measured. These represent the most distant quasars for which the spectrum of the fuzz has been obtained. The oxygen line ratios we observe are similar to those of the lower-z quasar 3C48 (to which the present quasars show a strong similarity) and again imply a high gas density. If confined by surrounding hot gas, the pressure is so high that an intracluster medium is required. This suggests that the quasars lie in clusters or groups of galaxies. (author)

  19. Development and implementation of a 600-MW natural gas cogeneration project - a financial case history

    International Nuclear Information System (INIS)

    Quinn, N.K.; Sherrill, R.L.

    1992-01-01

    In February 1990, General Electric Capital Corporation (GECC), through its wholly owned subsidiary, General Electric Power Funding Corporation (GEPFC), provided a number of commitments to a partnership (the Partnership) formed by a company that develops, owns, and operates cogeneration facilities to fund the development, construction, and permanent debt and equity financing of a 614 megawatt (M) cogeneration facility (the Project) to be located near a large refinery in the northeastern United States. The Project is unusual both for the magnitude of its natural gas requirements and for its contractual configuration. The Project's entire transportation needs and a substantial portion of its gas requirements will be met by a joint venture between two local gas distribution companies (the Joint Venture), one of which is a large gas-consuming utility in the eastern United States. The Project's power purchase customer, (the Utility Host), is another very large gas-consuming utility. Thus, the fuel cost recovery of the Project is determined by the Utility Host's gas costs while its actual bill for fuel will be heavily influenced by the Joint Venture's gas commodity and transportation costs. Therefore, in appraising the credit quality of the Project's proposed fuel supply arrangements, the key issue to be answered is: Are the Project's natural gas supply and transportation arrangements compatible with the fuel cost recovery provisions of the power sales agreement with the Utility Host? If so, then the sensitivity of the Project's financing to adverse gas price movements would be minimized

  20. Workshop on a project for a FZR-beam line at ESRF

    International Nuclear Information System (INIS)

    Matz, W.

    1993-10-01

    The Research Center Rossendorf (FZR) investigates the possibilities to install its own beam line as a Cooperate Research Group-project (CRG) at the European Synchrotron Radiation Facility (ESRF) in Grenoble. The main interests for the FZR to use high brillant synchrotron radiation are in the Institute of Radiochemistry and the Institute of Ion Beam Physics and Materials Research. This workshop was organized by these two institutes together with the FZR Study group Synchrotron. The purpose of the workshop was to achieve a better understanding for the technical needs of the projected beam line for the planned research projects. Experts with experience in beam line design met with the Rossendorf groups to discuss the best layout for such a beam line. The summary of this workshop and the copies of transparencies of the lectures that were given are published in this booklet. (orig.)

  1. Rhumb lines and map wars a social history of the Mercator projection

    CERN Document Server

    Monmonier, Mark

    2010-01-01

    In Rhumb Lines and Map Wars, Mark Monmonier offers an insightful, richly illustrated account of the controversies surrounding Flemish cartographer Gerard Mercator's legacy. He takes us back to 1569, when Mercator announced a clever method of portraying the earth on a flat surface, creating the first projection to take into account the earth's roundness. As Monmonier shows, mariners benefited most from Mercator's projection, which allowed for easy navigation of the high seas with rhumb lines-clear-cut routes with a constant compass bearing-for true direction. But the projection's popularity amo

  2. An on-line gas control system using an artificial intelligence language: PROLOG II

    International Nuclear Information System (INIS)

    Lai, C.

    1990-01-01

    An application of Artificial Intelligence to a real physics experiment is presented. This allows comparison with classical programming techniques. The PROLOG language appears as a convenient on-line language, easily interfaced to the low level service routines, for which algorithmic languages can still be used. Steering modules have been written for a gas acquisition and analysis program, and for a control system with graphic human interface. This system includes safety rules and automatic action sequences

  3. Contact line motion in confined liquid–gas systems: Slip versus phase transition

    KAUST Repository

    Xu, Xinpeng

    2010-11-30

    In two-phase flows, the interface intervening between the two fluid phases intersects the solid wall at the contact line. A classical problem in continuum fluid mechanics is the incompatibility between the moving contact line and the no-slip boundary condition, as the latter leads to a nonintegrable stress singularity. Recently, various diffuse-interface models have been proposed to explain the contact line motion using mechanisms missing from the sharp-interface treatments in fluid mechanics. In one-component two-phase (liquid–gas) systems, the contact line can move through the mass transport across the interface while in two-component (binary) fluids, the contact line can move through diffusive transport across the interface. While these mechanisms alone suffice to remove the stress singularity, the role of fluid slip at solid surface needs to be taken into account as well. In this paper, we apply the diffuse-interface modeling to the study of contact line motion in one-component liquid–gas systems, with the fluid slip fully taken into account. The dynamic van der Waals theory has been presented for one-component fluids, capable of describing the two-phase hydrodynamics involving the liquid–gas transition [A. Onuki, Phys. Rev. E 75, 036304 (2007)]. This theory assumes the local equilibrium condition at the solid surface for density and also the no-slip boundary condition for velocity. We use its hydrodynamicequations to describe the continuum hydrodynamics in the bulk region and derive the more general boundary conditions by introducing additional dissipative processes at the fluid–solid interface. The positive definiteness of entropy production rate is the guiding principle of our derivation. Numerical simulations based on a finite-difference algorithm have been carried out to investigate the dynamic effects of the newly derived boundary conditions, showing that the contact line can move through both phase transition and slip, with their relative

  4. Natural Gas Vehicle Cylinder Safety, Training and Inspection Project

    Energy Technology Data Exchange (ETDEWEB)

    Hank Seiff

    2008-12-31

    Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators and training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.

  5. Liquefied Natural Gas (LNG) project: a tax overview; Projeto Gas Natural Liquefeito (GNL): uma abordagem tributaria

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Claudia W.M.; Faria, Viviana C.S. [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    In the second semester of 2008, the Liquefied Natural Gas (LNG) will be introduced in the Brazilian energy matrix, it will be done through an innovator project according technical and tax points of view. Mentioned the enormous effort of adapting the federal legislation approved for this new activity which begins in the country, uncharged both the admission of the vessel as the import of the commodity in the incidence of federal taxes. The market for LNG demand simplified customs procedures in order to benefit from the dynamism that this industry offers, and in addition, a tax burden that encourages the use of a competitive and compatible with the precepts of sustainable development of the country. (author)

  6. GULF OF MEXICO SEAFLOOR STABILITY AND GAS HYDRATE MONITORING STATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    J. Robert Woolsey; Thomas M. McGee; Robin C. Buchannon

    2004-11-01

    The gas hydrates research Consortium (HRC), established and administered at the University if Mississippi's Center for Marine Research and Environmental Technology (CMRET) has been active on many fronts in FY 03. Extension of the original contract through March 2004, has allowed completion of many projects that were incomplete at the end of the original project period due, primarily, to severe weather and difficulties in rescheduling test cruises. The primary objective of the Consortium, to design and emplace a remote sea floor station for the monitoring of gas hydrates in the Gulf of Mexico by the year 2005 remains intact. However, the possibility of levering HRC research off of the Joint Industries Program (JIP) became a possibility that has demanded reevaluation of some of the fundamental assumptions of the station format. These provisions are discussed in Appendix A. Landmark achievements of FY03 include: (1) Continuation of Consortium development with new researchers and additional areas of research contribution being incorporated into the project. During this period, NOAA's National Undersea Research Program's (NURP) National Institute for Undersea Science and Technology (NIUST) became a Consortium funding partner, joining DOE and Minerals Management Service (MMS); (2) Very successful annual and semiannual meetings in Oxford Mississippi in February and September, 2003; (3) Collection of piston cores from MC798 in support of the effort to evaluate the site for possible monitoring station installation; (4) Completion of the site evaluation effort including reports of all localities in the northern Gulf of Mexico where hydrates have been documented or are strongly suspected to exist on the sea floor or in the shallow subsurface; (5) Collection and preliminary evaluation of vent gases and core samples of hydrate from sites in Green Canyon and Mississippi Canyon, northern Gulf of Mexico; (6) Monitoring of gas activity on the sea floor, acoustically

  7. Landfill Gas Energy Project Data and Landfill Technical Data

    Science.gov (United States)

    This page provides data from the LMOP Database for U.S. landfills and LFG energy projects in Excel files, a map of project and candidate landfill counts by state, project profiles for a select group of projects, and information about Project Expo sites.

  8. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    International Nuclear Information System (INIS)

    Fenham, J.

    2003-01-01

    as a source of CO 2 emission. A separate chapter is dedicated to each of these sectors. However, the report starts with a summary of the emissions with a section for each of the pollutants treated. At the end of each of these section the main differences between the present calculation and the values in Denmark's Second National Communication on Climate Change are described shortly. For each of the pollutants the development of the emissions in the period 1972-2012 and the various emission targets in Danish sector plants or international conventions are shown on a figure. Below the figures the emissions for the main emitting sectors are shown in a table. The years shown in these tables are not the same for all pollutants. When a column is marked with '2010' it means that the values in the columns are averaged over the first commitment period 2008-2012. It is not possible in this report to present all the data from the emission calculations. The data is contained in an EXEL notebook model. Appendix 1 contains a table with time-series for 1975-2012 for the greenhouse gases CO 2 , CH 4 and N 2 O for all emitting sectors. In Appendix 2 the results of the projections 2000-2012 are shown in the IPCC/CRF Sectoral Tables format in CO 2 equivalents for each greenhouse gas and in total (only source and sink categories with greenhouse gas emissions or removals are shown). The model is structured as a set of worksheets for the primary energy consuming sector and the model contains similar sets for each of the pollutants. Additional sheets have been included for the relevant pollutants, where emissions originate from non-combustion processes. Each of these spreadsheets contains time-series for the emissions from each of the primary fuels consumed in the sector. (ba)

  9. On-line sodium and cover as purity monitors gas operating tools at EBR-II

    International Nuclear Information System (INIS)

    Smith, C.R.F.; Richardson, W.J.; Holmes, J.T.

    1976-01-01

    Plugging temperature indicators, electrochemical oxygen meters and hydrogen diffusion meters are the on-line sodium purity monitors now in use at EBR-II. On-line gas chromatographs are used to monitor helium, hydrogen, oxygen and nitrogen impurities in the argon cover gases. Monitors for tritium-in-sodium and for hydrocarbons-in-cover gas have been developed and are scheduled for installation in the near future. An important advantage of on-line monitors over the conventional grab-sampling techniques is the speed of response to changing reactor conditions. This helps us to identify the source of the impurity, whether the cause may be transient or constant, and take corrective action as necessary. The oxygen meter is calibrated monthly against oxygen in sodium determined by the vanadium wire equilibration method. The other instruments either do not require calibration or are self-calibrating. The ranges, sensitivity and response times of all of the on-line purity monitors has proven satisfactory under EBR-II operating conditions

  10. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  11. Effects of self-similar correlations on the spectral line shape in the neutral gas

    International Nuclear Information System (INIS)

    Kharintsev, S.S.; Salakhov, M.Kh.

    2001-01-01

    The paper is devoted to the study of the influence of self-similar correlations on the Doppler and pressure broadening within the non-equilibrium Boltzmann gas. The diffuse model for the thermal motion of the radiator and the self-similar mechanism of interference of scalar perturbations for phase shifts of an atomic oscillator are developed. It is shown that taking into account self-similar correlation in a description of the spectral line shape allows one to explain, on the one hand, the additional spectral line Dicke-narrowing in the Doppler regime, and, on the other hand, the asymmetry in wings of the spectral line in a high pressure region

  12. Reactors Dynamic analysis Due to Reactivity of The RSG-Gas at One Line Cooling Mode

    International Nuclear Information System (INIS)

    Hastuti, Endiah Puji

    2003-01-01

    In the frame of minimizing the operation-cost, operation mode using one line cooling system is being evaluated. Maximum reactor power has been determined and steady state and LOFA transient analysis have also been done. To complete those analyses, the reactivity analysis was done by means of a core dynamic and thermal hydraulic code, PARET-ANL. Accident simulation was done. by a ramp reactivity accident due to control rod withdrawal. Reactivity analysis was carried out at two power range i.e. low and high power level, by imposing one line mode reactor protection limits. The results show that technically, the RSG-Gas can be operated safely using one line mode

  13. 75 FR 30021 - South Carolina Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference...

    Science.gov (United States)

    2010-05-28

    ... Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference With the National Marine... from Federal Energy Regulatory Commission (FERC) Headquarters, commencing at 2 p.m. (Eastern Standard... Project. The South Carolina Electric and Gas Company will also participate in the teleconference. All...

  14. 76 FR 8293 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2011-02-14

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 8, 2011. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: Effective... of Subjects in 18 CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  15. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2012-02-15

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 9, 2012. AGENCY: Federal Energy Regulatory... limits for natural gas pipelines blanket construction certificates for each calendar year. DATES: This... CFR Part 157 Administrative practice and procedure, Natural gas, Reporting and recordkeeping...

  16. The U.S. Geological Survey’s Gas Hydrates Project

    Science.gov (United States)

    Ruppel, Carolyn D.

    2018-01-17

    The Gas Hydrates Project at the U.S. Geological Survey (USGS) focuses on the study of methane hydrates in natural environments. The project is a collaboration between the USGS Energy Resources and the USGS Coastal and Marine Geology Programs and works closely with other U.S. Federal agencies, some State governments, outside research organizations, and international partners. The USGS studies the formation and distribution of gas hydrates in nature, the potential of hydrates as an energy resource, and the interaction between methane hydrates and the environment. The USGS Gas Hydrates Project carries out field programs and participates in drilling expeditions to study marine and terrestrial gas hydrates. USGS scientists also acquire new geophysical data and sample sediments, the water column, and the atmosphere in areas where gas hydrates occur. In addition, project personnel analyze datasets provided by partners and manage unique laboratories that supply state-of-the-art analytical capabilities to advance national and international priorities related to gas hydrates.

  17. Northern entanglement : Arctic gas pipeline plans caught in web of competing interests, but dire supply-demand forecasts indicate line will be built

    International Nuclear Information System (INIS)

    Stonehouse, D.

    2005-01-01

    This article discussed land access and regulatory issues surrounding decisions to stop field work of the Mackenzie Valley pipeline in the spring of 2005. Although current supply and demand balances in natural gas markets argue that the pipeline will be beneficial, Imperial Oil and its partners have halted activities such as geotechnical data-gathering programs and preparatory work on contracting construction. The project's future depends on the successful resolution of First Nations land claims, governmental disputes and various activist groups protesting the pipeline's construction. Imperial Oil has suggested that the pipeline presents a significant opportunity for the people of the North to reduce their reliance on government and will create jobs and business opportunities for Aboriginal people. In the aftermath of work stoppage, Alberta's former Energy Minister stated that imports of Liquefied Natural Gas (LNG) and Alaska gas from the proposed Alaska Highway Pipeline Project may arrive on the market in advance of the Mackenzie Valley project, which would affect the project's financial future. It was noted that access and benefits agreements with First Nations stakeholders have yet to be reached. Lawsuits involving the Deh Cho First Nations were examined. It was also suggested that Imperial Oil has not included information on the Alberta portion of the project in its environmental impact assessment. It was concluded that if the Mackenzie Delta line isn't in service by 2010, North American consumers can expect to spend an extra $190 billion on gas from 2011 to 2020. 3 figs

  18. On-Line Fission Gas Release Monitoring System in the High Flux Reactor Petten

    International Nuclear Information System (INIS)

    Laurie, M.; Fuetterer, M. A.; Appelman, K.H.; Lapetite, J.-M.; Marmier, A.; Knol, S.; Best, J.

    2013-06-01

    For HTR fuel irradiation tests in the HFR Petten a specific installation was designed and installed dubbed the 'Sweep Loop Facility' (SLF). The SLF is tasked with three functions, namely temperature control by gas mixture technique, surveillance of safety parameters (temperature, pressure, radioactivity etc.) and analysis of fission gas release for three individual capsules in two separate experimental rigs. The SLF enables continuous and independent surveillance of all gas circuits. The release of volatile fission products (FP) from the in-pile experiments is monitored by continuous gas purging. The fractional release of these FP, defined as the ratio between release rate of a gaseous fission isotope (measured) to its instantaneous birth rate (calculated), is a licensing-relevant test for HTR fuel. The developed gamma spectrometry station allows for higher measurement frequencies, thus enabling follow-up of rapid and massive release transients. The designed stand-alone system was tested and fully used through the final irradiation period of the HFR-EU1 experiment which was terminated on 18 February 2010. Its robustness allowed the set up to be used as extra safety instrumentation. This paper describes the gas activity measurement technique based on HPGe gamma spectrometry and illustrates how qualitative and quantitative analysis of volatile FP can be performed on-line. (authors)

  19. Evaluation of the Frequency for Gas Sampling for the High Burnup Confirmatory Data Project

    Energy Technology Data Exchange (ETDEWEB)

    Stockman, Christine T. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Alsaed, Halim A. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bryan, Charles R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Marschman, Steven C. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Scaglione, John M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-05-01

    This report provides a technically based gas sampling frequency strategy for the High Burnup (HBU) Confirmatory Data Project. The evaluation of: 1) the types and magnitudes of gases that could be present in the project cask and, 2) the degradation mechanisms that could change gas compositions culminates in an adaptive gas sampling frequency strategy. This adaptive strategy is compared against the sampling frequency that has been developed based on operational considerations.

  20. Conflict Approaches of Effective Project Manager in the Upstream Sector of Indonesian Oil & Gas Industry

    Directory of Open Access Journals (Sweden)

    Adhi Cahyono

    2012-11-01

    Full Text Available Normal 0 false false false IN X-NONE AR-SA MicrosoftInternetExplorer4 Conflict can be functional or dysfunctional to the organization’s performance. This study focused on the relationship between conflict approaches implemented by the project manager based on project team member’s perception on the effectiveness of the project manager in managing project’s conflict. Questionnaires were modified from Barker et al. (1988 to measure conflict management approaches and outcomes of managing project conflict. Data were gathered from 57 respondents who worked in the Engineering, Procurement, and Construction (EPC contractors serving the upstream sector of the Oil and Gas industry in Indonesia. By using Pearson correlation, result of this study indicated that project managers were perceived to be effective in managing project conflict when implementing cooperative and confi rmative approaches, but ineffective when combining competitive and avoidance approaches. Further research should investigate correlation between cultural dimensions with conflict approaches and outcomes of managing conflict. Keywords: Conflict approaches, effective project manager, EPC contractors, upstream sector of oil and gas industry /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:Arial; mso-bidi-theme-font:minor-bidi; mso-fareast-language:EN-US;}

  1. Formation rate of ammonium nitrate in the off-gas line of SRAT and SME in DWPF

    International Nuclear Information System (INIS)

    Lee, L.

    1992-01-01

    A mathematical model for the formation rate of ammonium nitrate in the off-gas line of the Sludge Receipt and Adjustment Tank (SRAT) and the Slurry Mixed Evaporator (SME) in DWPF has been developed. The formation rate of ammonium nitrate in the off-gas line depends on pH, temperature, volume and total concentration of ammonia and ammonium ion. Based on a typical SRAT and SME cycle in DWPF, this model predicts the SRAT contributes about 50 lbs of ammonium nitrate while SME contributes about 60 lbs of ammonium nitrate to the off-gas line

  2. Crowdsourcing Broad Absorption Line Properties and Other Features of Quasar Outflow Using Zooniverse Citizen Science Project Platform

    Science.gov (United States)

    Crowe, Cassie; Lundgren, Britt; Grier, Catherine

    2018-01-01

    The Sloan Digital Sky Survey (SDSS) regularly publishes vast catalogs of quasars and other astronomical objects. Previously, the SDSS collaboration has used visual inspection to check quasar redshift validity and flag instances of broad absorption lines (BALs). This information helps researchers to easily single out the quasars with BAL properties and study their outflows and other intervening gas clouds. Due to the ever-growing number of new SDSS quasar observations, visual inspections are no longer possible using previous methods. Currently, BAL information is being determined entirely computationally, and the accuracy of that information is not precisely known. This project uses the Zooniverse citizen science platform to visually inspect quasar spectra for BAL properties, to check the accuracy of the current autonomous methods, and to flag multi-phase outflows and find candidates for in-falling gas into the quasar central engine. The layout and format of a Zooniverse project provides an easier way to inspect and record data on each spectrum and share the workload via crowdsourcing. Work done by the SDSS collaboration members is serving as a beta test for a public project upon the official release of the DR14 quasar catalog by SDSS.

  3. Gas Dynamic Spray Technology Demonstration Project Management. Joint Test Report

    Science.gov (United States)

    Lewis, Pattie

    2011-01-01

    The standard practice for protecting metallic substrates in atmospheric environments is the use of an applied coating system. Current coating systems used across AFSPC and NASA contain volatile organic compounds (VOCs) and hazardous air pollutants (HAPs). These coatings are sUbject to environmental regulations at the Federal and State levels that limit their usage. In addition, these coatings often cannot withstand the high temperatures and exhaust that may be experienced by Air Force Space Command (AFSPC) and NASA structures. In response to these concerns, AFSPC and NASA have approved the use of thermal spray coatings (TSCs). Thermal spray coatings are extremely durable and environmentally friendly coating alternatives, but utilize large cumbersome equipment for application that make the coatings difficult and time consuming to repair. Other concerns include difficulties coating complex geometries and the cost of equipment, training, and materials. Gas Dynamic Spray (GOS) technology (also known as Cold Spray) was evaluated as a smaller, more maneuverable repair method as well as for areas where thermal spray techniques are not as effective. The technology can result in reduced maintenance and thus reduced hazardous materials/wastes associated with current processes. Thermal spray and GOS coatings also have no VOCs and are environmentally preferable coatings. The primary objective of this effort was to demonstrate GDS technology as a repair method for TSCs. The aim was that successful completion of this project would result in approval of GDS technology as a repair method for TSCs at AFSPC and NASA installations to improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination, and reduce the amount of hazardous waste generated.

  4. WISDOM Project - II. Molecular gas measurement of the supermassive black hole mass in NGC 4697

    Science.gov (United States)

    Davis, Timothy A.; Bureau, Martin; Onishi, Kyoko; Cappellari, Michele; Iguchi, Satoru; Sarzi, Marc

    2017-07-01

    As part of the mm-Wave Interferometric Survey of Dark Object Masses (WISDOM) project, we present an estimate of the mass of the supermassive black hole (SMBH) in the nearby fast-rotating early-type galaxy NGC 4697. This estimate is based on Atacama Large Millimeter/submillimeter Array (ALMA) cycle-3 observations of the 12CO(2-1) emission line with a linear resolution of 29 pc (0.53 arcsec). We find that NGC 4697 hosts a small relaxed central molecular gas disc with a mass of 1.6 × 107 M⊙, co-spatial with the obscuring dust disc visible in optical Hubble Space Telescope imaging. We also resolve thermal 1 mm continuum emission from the dust in this disc. NGC 4697 is found to have a very low molecular gas velocity dispersion, σgas = 1.65^{+0.68}_{-0.65} km s-1. This seems to be partially because the giant molecular cloud mass function is not fully sampled, but other mechanisms such as chemical differentiation in a hard radiation field or morphological quenching also seem to be required. We detect a Keplerian increase of the rotation of the molecular gas in the very centre of NGC 4697, and use forward modelling of the ALMA data cube in a Bayesian framework with the KINematic Molecular Simulation (kinms) code to estimate an SMBH mass of (1.3_{-0.17}^{+0.18}) × 108 M⊙ and an I-band mass-to-light ratio of 2.14_{-0.05}^{+0.04} M⊙/L⊙ (at the 99 per cent confidence level). Our estimate of the SMBH mass is entirely consistent with previous measurements from stellar kinematics. This increases confidence in the growing number of SMBH mass estimates being obtained in the ALMA era.

  5. Dense-gas properties in Arp 220 revealed by isotopologue lines

    Science.gov (United States)

    Wang, Junzhi; Zhang, Zhi-Yu; Zhang, Jiangshui; Shi, Yong; Fang, Min

    2016-02-01

    We present observations of isotopologue lines of dense-gas tracers at 3 mm and 1 mm towards the nearest ultra-luminous infrared galaxy Arp 220. The 3-mm and 1-mm observations were performed with the Institut de Radioastronomie Millimétrique 30-m telescope and the Atacama Pathfinder Experiment 12-m telescope, respectively. We detected H13CN and HN13C in 1-0 and 3-2, and HC15N 1-0, among which HC15N 1-0 and HN13C 1-0 are detected in Arp 220 for the first time. The H13CO+ 1-0 and 3-2 lines are unlikely to be detected because of the confusion of SiO lines. We find that the ratio of the line brightness temperatures of HN13C 3-2/1-0 is 2.4, which is significantly higher than that of H13CN 3-2/1-0 (0.73). This indicates that HN13C and HNC molecules are in denser regions than H13CN and HCN molecules. With the line ratio of H13CN 1-0 and HC15N 1-0, the 14N/15N ratio was estimated to be 440^{+140}_{-82}, which is larger than that of the local interstellar medium.

  6. Iranian 42/40 inch gas line to central Persia and USSR one of the world's largest

    Energy Technology Data Exchange (ETDEWEB)

    Naghavi, S; Manoochehri, N

    1969-03-01

    Iran Gas Trunkline consists of 1,120 km of 42 in./40 in. main pipeline, and 675 km of spur lines. It also consists of 104 km gas gathering lines, compression facilities for collection, treatment, and transportation of dry sweet gas to Shiraz, Esfahan and Tehran for industrial purposes in early spring 1970 and export gas to Russia during fall that year. The system will have an ultimate capacity for 1,650 MMscfd of gas equivalent to about 275,000 bpd of crude oil. Distribution will commence in Tehran and Esfahan in 1970, probably to industrial consumers only initially, but later on also to domestic and commercial users. Gas will be used extensively for power generation in these cities, the need for which is increasing rapidly. The source gas used in this pipeline would otherwise be flared to waste.

  7. Commercial potential of natural gas storage in lined rock caverns (LRC)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    The geologic conditions in many regions of the United States will not permit the development of economical high-deliverability gas storage in salt caverns. These regions include the entire Eastern Seaboard; several northern states, notably Minnesota and Wisconsin; many of the Rocky Mountain States; and most of the Pacific Northwest. In late 1997, the United States Department of Energy (USDOE) Federal Energy Technology Center engaged Sofregaz US to investigate the commercialization potential of natural gas storage in Lined Rock Caverns (LRC). Sofregaz US teamed with Gaz de France and Sydkraft, who had formed a consortium, called LRC, to perform the study for the USDOE. Underground storage of natural gas is generally achieved in depleted oil and gas fields, aquifers, and solution-mined salt caverns. These storage technologies require specific geologic conditions. Unlined rock caverns have been used for decades to store hydrocarbons - mostly liquids such as crude oil, butane, and propane. The maximum operating pressure in unlined rock caverns is limited, since the host rock is never entirely impervious. The LRC technology allows a significant increase in the maximum operating pressure over the unlined storage cavern concept, since the gas in storage is completely contained with an impervious liner. The LRC technology has been under development in Sweden by Sydkraft since 1987. The development process has included extensive technical studies, laboratory testing, field tests, and most recently includes a storage facility being constructed in southern Sweden (Skallen). The LRC development effort has shown that the concept is technically and economically viable. The Skallen storage facility will have a rock cover of 115 meters (375 feet), a storage volume of 40,000 cubic meters (250,000 petroleum barrels), and a maximum operating pressure of 20 MPa (2,900 psi). There is a potential for commercialization of the LRC technology in the United States. Two regions were studied

  8. Commercial potential of natural gas storage in lined rock caverns (LRC); FINAL

    International Nuclear Information System (INIS)

    NONE

    1999-01-01

    The geologic conditions in many regions of the United States will not permit the development of economical high-deliverability gas storage in salt caverns. These regions include the entire Eastern Seaboard; several northern states, notably Minnesota and Wisconsin; many of the Rocky Mountain States; and most of the Pacific Northwest. In late 1997, the United States Department of Energy (USDOE) Federal Energy Technology Center engaged Sofregaz US to investigate the commercialization potential of natural gas storage in Lined Rock Caverns (LRC). Sofregaz US teamed with Gaz de France and Sydkraft, who had formed a consortium, called LRC, to perform the study for the USDOE. Underground storage of natural gas is generally achieved in depleted oil and gas fields, aquifers, and solution-mined salt caverns. These storage technologies require specific geologic conditions. Unlined rock caverns have been used for decades to store hydrocarbons - mostly liquids such as crude oil, butane, and propane. The maximum operating pressure in unlined rock caverns is limited, since the host rock is never entirely impervious. The LRC technology allows a significant increase in the maximum operating pressure over the unlined storage cavern concept, since the gas in storage is completely contained with an impervious liner. The LRC technology has been under development in Sweden by Sydkraft since 1987. The development process has included extensive technical studies, laboratory testing, field tests, and most recently includes a storage facility being constructed in southern Sweden (Skallen). The LRC development effort has shown that the concept is technically and economically viable. The Skallen storage facility will have a rock cover of 115 meters (375 feet), a storage volume of 40,000 cubic meters (250,000 petroleum barrels), and a maximum operating pressure of 20 MPa (2,900 psi). There is a potential for commercialization of the LRC technology in the United States. Two regions were studied

  9. Generation of the line radiation of argon added to DT gas in Iskra-5 experiments

    International Nuclear Information System (INIS)

    Bel'kov, S.A.; Bessarab, A.V.; Veselov, A.V.; Gaidash, V.A.; Dolgoleva, G.V.; Zhidkov, N.V.; Izgorodin, V.M.; Kirillov, G.A.; Kochemasov, G.G.; Litvin, D.N.; Martynenko, S.P.; Mitrofanov, E.I.; Murugov, V.M.; Mkhitar'yan, L.S.; Petrov, S.I.; Pinegin, A.V.; Punin, V.T.; Suslov, N.A.

    1998-01-01

    The first experiments measuring the density of a compressed deuterium and tritium mixture in microtargets of indirect irradiation (x-ray targets) were performed at the Iskra-5 facility. The density was determined according to the broadening of the lines of hydrogen- and helium-like argon added to the DT gas as a diagnostics material. A series of three experiments was performed with x-ray targets in which the central capsule filled with a DT+Ar mixture over a range of shell thicknesses. In two of the experiments, argon emission spectra were recorded and the density of the compressed gas was determined. For a microtarget approximately 280 μm in diameter with a wall approximately 7 μm thick, an analysis of the experimental results yielded an estimated density in the compressed gas of ∼1 g/cm 3 . Gas-dynamic calculations using the SNDA (spectral nonequilibrium diffusion with absorption) program show that argon emission takes place just after reaching maximum temperature, but much sooner than maximum compression. The results of a calculation for an experiment with low relative Ar concentration are in overall agreement with the experimental data. Additional investigations are needed to interpret experiments at a relatively high concentration

  10. A statistical study of H i gas in nearby narrow-line AGN-hosting galaxies

    International Nuclear Information System (INIS)

    Zhu, Yi-Nan; Wu, Hong

    2015-01-01

    As a quenching mechanism, active galactic nucleus (AGN) feedback could suppress on going star formation in host galaxies. On the basis of a sample of galaxies selected from the Arecibo Legacy Fast ALFA (ALFALFA) H i survey, the dependence of the H i mass (M H i ), stellar mass (M * ), and H i-to-stellar mass ratio (M H i /M * ) on various tracers of AGN activity are presented and analyzed in this paper. Almost all the AGN hostings in this sample are gas-rich galaxies, and there is not any evidence to indicate that the AGN activity could increase or decrease either M H i or M H i /M * . The position of the cold neutral gas cannot be fixed accurately based only on available H i data, due to the large beam size of ALFALFA survey. In addition, even though AGN hostings are more easily detected by an H i survey compared with absorption line galaxies, these two types of galaxies show similar star formation history. If an AGN hosting would ultimately evolve into an old red galaxy with low cold gas, then when and how the gas has been exhausted must be solved by future hypotheses and observations.

  11. A statistical study of H i gas in nearby narrow-line AGN-hosting galaxies

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Yi-Nan; Wu, Hong, E-mail: zyn@bao.ac.cn, E-mail: hwu@bao.ac.cn [Key Laboratory of Optical Astronomy, National Astronomical Observatories, Chinese Academy of Sciences, Beijing 100012 (China)

    2015-01-01

    As a quenching mechanism, active galactic nucleus (AGN) feedback could suppress on going star formation in host galaxies. On the basis of a sample of galaxies selected from the Arecibo Legacy Fast ALFA (ALFALFA) H i survey, the dependence of the H i mass (M{sub H} {sub i}), stellar mass (M{sub *}), and H i-to-stellar mass ratio (M{sub H} {sub i}/M{sub *}) on various tracers of AGN activity are presented and analyzed in this paper. Almost all the AGN hostings in this sample are gas-rich galaxies, and there is not any evidence to indicate that the AGN activity could increase or decrease either M{sub H} {sub i} or M{sub H} {sub i}/M{sub *}. The position of the cold neutral gas cannot be fixed accurately based only on available H i data, due to the large beam size of ALFALFA survey. In addition, even though AGN hostings are more easily detected by an H i survey compared with absorption line galaxies, these two types of galaxies show similar star formation history. If an AGN hosting would ultimately evolve into an old red galaxy with low cold gas, then when and how the gas has been exhausted must be solved by future hypotheses and observations.

  12. Characteristics of a gas-jet transport system for an on-line isotope separator

    International Nuclear Information System (INIS)

    Kawade, K.; Yamamoto, H.; Amano, H.; Hanada, M.; Katoh, T.; Okano, K.; Kawase, Y.; Fujiwara, I.

    1982-01-01

    Basic characteristics of a gas-jet transport system for an on-line isotope separator have been investigated using a 252 Cf source and a 235 U fission source. The transport efficiency of fission products through a capillary has been measured to be about 60% for the 235 U fission source. The sweep-out time of fission products through a target chamber and the transit time through a capillary have been measured for He, N 2 and CO 2 gases at several pressures. The measured sweep-out times have been almost equal to the exchange over time of the gas. The transit times have been found to be reasonably predicted by calculations. The transport system has been incorporated into the KUR-ISOL and is used for the study of short-lived nuclei. (orig.)

  13. Gas supply for independent power projects: Drilling programs and reserve acquisitions

    International Nuclear Information System (INIS)

    Lambert, J.D.; Walker, R.K.

    1990-01-01

    Developers of gas-fired independent power projects, although drawn to gas as the fuel of choice for economic and environmental reasons, are finding the problem of cost-effective gas supply to be intractable. By one estimate, there are $6 billion worth of gas-fired projects languishing in the planning stage for want of long-term gas supply that is acceptable to project lenders. Worse still, as the authors are aware, some currently operating gas-fired projects lack such a supply, thus forcing the developer to rely on the spot market for gas as an interim (and unsatisfactory) solution. Although spot market prices in the deregulated natural gas industry have remained relatively low over several years, long-term gas supply has become problematic, particularly for power projects whose economics typically require an assured supply at a determined price over a multiyear period. In short, while there is an increasing demand for gas as a preferred source of fuel supply for power projects, there are discontinuities in the approaches taken to contracting for that supply by producers and developers. These concern primarily allocation of the risk of commodity-driven price increases during the term of the fuel supply contract. Without a means of accommodating price-related risk, the parties will inevitably find themselves at an impasse in contract negotiations. If there is a barrier to the independent power generation industry's vertical integration into gas production, it is the fundamental insularity of the two industries. As they have discovered, it may be indispensable for gas producers and power developers to employ intermediaries familiar with both industries in order to consummate appropriate joint-venture drilling programs and reserve acquisitions. Given the economic consequences of doing so successfully, however, they believe such programs and acquisitions may become an integral part of independent power developers' business strategy in the 1990s and beyond

  14. Study of turbulent and shock heated IGM gas with emission line spectroscopy in the Taffy galaxies

    Science.gov (United States)

    Joshi, Bhavin; Appleton, Phil; Blanc, Guillermo; Guillard, Pierre; Freeland, Emily; Peterson, Bradley; Alatalo, Katherine

    2018-01-01

    We present our results from optical IFU observations of the Taffy system (UGC 12914/15); named so because of the radio emission that stretches between the two galaxies. The Taffy galaxies are a major merger pair of galaxies where two gas-rich spiral galaxies have collided face on and passed through each other. The pair presents an unusually low IR luminosity (L_FIR ~ 4.5 x 10^{10} L_solar) and SFR (~ 0.23 M_solar / yr) for a typical post merger system. It was also found from Spitzer and Chandra observations that the Taffy "bridge" between the galaxies contains large amounts of warm molecular Hydrogen, >4.5 x 10^8 M_solar at 150-175K, and also shows soft X-ray emission. These results hinted at shock heating as a likely mechanism for heating the large amounts of gas in the Taffy bridge and keeping it at these temperatures, after other sources of heating are ruled out. The data we present in this paper are from the VIRUS-P instrument (now called GCMS) on the Harlan J. Smith 2.7m telescope at McDonald Observatory. We detect ionized gas all throughout the Taffy galaxies and in the bridge between them. Interestingly, the ionized gas shows emission line profiles with two velocity components almost all throughout the system. We also show evidence, through line diagnostic (BPT) diagrams, that the velocity component with lower velocity is likely excited by star formation whereas the velocity component with higher velocity is likely excited by shocks. We also find evidence for post-starburst populations in parts of the Taffy system.

  15. WISDOM project - I. Black hole mass measurement using molecular gas kinematics in NGC 3665

    Science.gov (United States)

    Onishi, Kyoko; Iguchi, Satoru; Davis, Timothy A.; Bureau, Martin; Cappellari, Michele; Sarzi, Marc; Blitz, Leo

    2017-07-01

    As a part of the mm-Wave Interferometric Survey of Dark Object Masses (WISDOM) project, we present an estimate of the mass of the supermassive black hole (SMBH) in the nearby fast-rotator early-type galaxy NGC 3665. We obtained the Combined Array for Research in Millimeter Astronomy (CARMA) B and C array observations of the 12CO(J = 2 - 1) emission line with a combined angular resolution of 0.59 arcsec. We analysed and modelled the three-dimensional molecular gas kinematics, obtaining a best-fitting SMBH mass M_BH=5.75^{+1.49}_{-1.18} × 108 M⊙, a mass-to-light ratio at H-band (M/L)H = 1.45 ± 0.04 (M/L)⊙,H and other parameters describing the geometry of the molecular gas disc (statistical errors, all at 3σ confidence). We estimate the systematic uncertainties on the stellar M/L to be ≈0.2 (M/L)⊙,H, and on the SMBH mass to be ≈0.4 × 108 M⊙. The measured SMBH mass is consistent with that estimated from the latest correlations with galaxy properties. Following our older works, we also analysed and modelled the kinematics using only the major-axis position-velocity diagram, and conclude that the two methods are consistent.

  16. Case study: I-95 Landfill gas recovery project Fairfax County, Virginia

    International Nuclear Information System (INIS)

    McGuigan, M.J.; Peterson, E.R.; Smithberger, J.M.; Owen, W.L.

    1993-01-01

    This paper presents a case study of the landfill gas (LFG) recovery project at the I-95 Landfill in Fairfax County, Virginia. The project originally was conceived more than 10 years ago and has overcome numerous obstacles enroute to its present success. The efforts of the landfill owner (Fairfax County) and the project developer (Michigan Cogeneration Systems, Inc.) to surmount these obstacles are presented

  17. Design of project management system for 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Zhu Yan; Xu Yuanhui

    1998-01-01

    A framework of project management information system (MIS) for 10 MW high temperature gas-cooled test reactor is introduced. Based on it, the design of nuclear project management information system and project monitoring system (PMS) are given. Additionally, a new method of developing MIS and Decision Support System (DSS) has been tried

  18. Gas Generation during Sodium Permanganate Addition to HB-Line Phase II Filtrate Tank

    International Nuclear Information System (INIS)

    Hill, B.C.

    2002-01-01

    HB-Line Phase II process requires the addition of sodium permanganate followed by a sodium nitrite addition to prevent the precipitation of plutonium solids in a non-geometrically safe vessel. Previous experimental work has shown this method effective. Current concerns are related to the gas generated by the reaction. Potential difficulties include tank over-pressurization and tank overflow due to foaming or eructation. It is also necessary to verify that the quantity of permanganate specified by the facility is sufficient to reach the desired endpoint in a single addition

  19. Managing your engineering consultants: Steps for simultaneously improving operations, project implementation, and your bottom line

    International Nuclear Information System (INIS)

    Kirchen, E.R.; Perilloux, B.L.

    1997-01-01

    The domestic oil and gas industry has responded to depleting reserves and increasing operating costs by downsizing the overhead required to maintain production and processing facilities. For many companies this downsizing has resulted in a reduced in-house engineering staff and a greater reliance on consulting engineering services. To get the most benefit from consulting engineering companies, the partnership between consultants and the oil and gas company needs to be carefully considered. Unfortunately, these partnerships are often developed at the home office with visionary goals in mind, only to be implemented reluctantly on a local level. A better strategy is to implement partnering tools on the local level and allow these partnerships to develop naturally, and at times, uniquely, at each location. The following such tools detailed in this paper are: manpower leveraging -- using field-trained consulting engineers to address project design/implementation and field/construction support so that the operating company's engineers may focus on management and detailed development of high-return projects; enhanced project scope and design review -- developing and reviewing project scope(s) and preliminary engineering designs to minimize engineering/construction costs as well as optimize the operability and constructability of the project; and consulting rate standardization -- understanding and structuring the consultant's rates so that neither side is exploited and so that the project is staffed in the interest of project execution and not maximum profits for the consultant

  20. Support services for the automative gas turbine project

    Science.gov (United States)

    Golec, T. (Editor)

    1981-01-01

    Support was provided to DOE and NASA in their efforts to inform industry, the public, and Government on the benefits and purpose of the gas turbine programs through demonstrations and exhibits. Tasks were carried out for maintenance, repair, and retrofit of the experimental gas turbine engines being used by NASA in their gas turbine technology programs and in program demonstrations. Limited support testing was conducted at Chrysler in which data were generated on air bearing rotor shaft dynamics, heavy duty variable sheave rubber belts, high temperature elastomer regenerator drive mounting and graphite regenerator seal friction characteristics.

  1. Analytical treatment of gas flows through multilayer insulation, project 1

    Science.gov (United States)

    Lin, J. T.

    1972-01-01

    A theoretical investigation of gas flow inside a multilayer insulation system was made for the case of the broadside pumping process. A set of simultaneous first-order differential equations for the temperature and pressure of the gas molecules through the perforations on the insulation layers. A modified Runge-Kutta method was used for numerical experiment. The numerical stability problem was also investigated. It was shown that when the relaxation time is less than the time period over which the gas properties change appreciably, the set of differential equations can be replaced by a set of algebraic equations for solution. Numerical examples were given and comparisons with experimental data were made.

  2. Nahm transformation for parabolic Higgs bundles on the projective line --- case of non-semisimple residues

    OpenAIRE

    Szabo, Szilard

    2016-01-01

    We extend our earlier construction of Nahm transformation for parabolic Higgs bundles on the projective line to solutions with not necessarily semisimple residues and show that it determines a holomorphic mapping on corresponding moduli spaces. The construction relies on suitable elementary modifications of the logarithmic Dolbeault complex.

  3. A system for accurate on-line measurement of total gas consumption or production rates in microbioreactors

    NARCIS (Netherlands)

    van Leeuwen, Michiel; Heijnen, Joseph J.; Gardeniers, Johannes G.E.; Oudshoorn, Arthur; Noorman, Henk; Visser, Jan; van der Wielen, Luuk A.M.; van Gulik, Walter M.

    2009-01-01

    A system has been developed, based on pressure controlled gas pumping, for accurate measurement of total gas consumption or production rates in the nmol/min range, applicable for on-line monitoring of bioconversions in microbioreactors. The system was validated by carrying out a bioconversion with

  4. The cyclotron gas stopper project at the NSCL

    Energy Technology Data Exchange (ETDEWEB)

    Guenaut, C., E-mail: guenaut@nscl.msu.edu; Bollen, G.; Chouhan, S.; Marti, F.; Morrissey, D. J.; Lawton, D.; Ottarson, J.; Pang, G. K.; Schwarz, S.; Sherrill, B. M. [Michigan State University (United States); Wada, M. [RIKEN (Japan); Zeller, A. F. [Michigan State University (United States)

    2006-11-15

    Gas stopping is becoming the method of choice for converting beams of rare isotopes obtained via projectile fragmentation and in-flight separation into low-energy beams. These beams allow ISOL-type experiments, such as mass measurements with traps or laser spectroscopy, to be performed with projectile fragmentation products. Current gas stopper systems for high-energy beams are based on linear gas cells filled with 0.1-1 bar of helium. While already used successfully for experiments, it was found that space charge effects induced by the ionization of the helium atoms during the stopping process pose a limit on the maximum beam rate that can be used. Furthermore, the extraction time of stopped ions from these devices can exceed 100 ms causing substantial decay losses for very short-lived isotopes. To avoid these limitations, a new type of gas stopper is being developed at the NSCL/MSU. The new system is based on a cyclotron-type magnet with a stopping chamber filled with Helium buffer gas at low pressure. RF-guiding techniques are used to extract the ions. The space charge effects are considerably reduced by the large volume and due to a separation between the stopping region and the region of highest ionization. Cyclotron gas stopper systems of different sizes and with different magnetic field strengths and field shapes are presently investigated.

  5. The cyclotron gas stopper project at the NSCL

    International Nuclear Information System (INIS)

    Guenaut, C.; Bollen, G.; Chouhan, S.; Marti, F.; Morrissey, D. J.; Lawton, D.; Ottarson, J.; Pang, G. K.; Schwarz, S.; Sherrill, B. M.; Wada, M.; Zeller, A. F.

    2006-01-01

    Gas stopping is becoming the method of choice for converting beams of rare isotopes obtained via projectile fragmentation and in-flight separation into low-energy beams. These beams allow ISOL-type experiments, such as mass measurements with traps or laser spectroscopy, to be performed with projectile fragmentation products. Current gas stopper systems for high-energy beams are based on linear gas cells filled with 0.1-1 bar of helium. While already used successfully for experiments, it was found that space charge effects induced by the ionization of the helium atoms during the stopping process pose a limit on the maximum beam rate that can be used. Furthermore, the extraction time of stopped ions from these devices can exceed 100 ms causing substantial decay losses for very short-lived isotopes. To avoid these limitations, a new type of gas stopper is being developed at the NSCL/MSU. The new system is based on a cyclotron-type magnet with a stopping chamber filled with Helium buffer gas at low pressure. RF-guiding techniques are used to extract the ions. The space charge effects are considerably reduced by the large volume and due to a separation between the stopping region and the region of highest ionization. Cyclotron gas stopper systems of different sizes and with different magnetic field strengths and field shapes are presently investigated.

  6. Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado

    International Nuclear Information System (INIS)

    1993-05-01

    Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmont. It is a single circuit 115-kV line, 31.5 miles long, and was built in 1950-51 on a 75-foot wide right-of-way (ROW) using wood H-frame structures. Western proposes to build 27 new structures along the line, to replace or modify 45 of the existing structures and to remote 11 of them. Many of these additions and changes would involve structures that are approximately 5 to 15 feet taller than the existing ones. The existing conductors and ground wires would remain in place. The purpose of these actions would be to allow the power carrying capability of the line to be increased and to replace deteriorating/structural members. Western would be the sole participant in the proposed project. This report gives an analysis of the study area environment and the development of alternative routes. An assessment is presented of the impacts of the primary alternative routes. The environmental consequences of this project are addressed

  7. Natural gas distribution operation and maintenance dissemination project Kaunas City, Lithuania. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The main objective of this project has been to disseminate the results and experiences achieved during the former projects in Kaunas to other Lithuanian gas companies and the gas sector in general. Also new subjects selected in co-operation with Kaunas Gas Company, the Lithuanian Energy Institute and the Lithuanian Gas Training Centre, where improvements were required, have been implemented. The components of the project were the following: (1) A training course in cathodic protection. One course concerning measuring and registration and one course concerning design and implementation. (2) A pilot project to develop methods for measuring cathodic protection on coherent steel pipe network. (3) Analysis of gas losses related to types of gas meters and calibration of meters. (4) A training course and technology transfer concerning relations between gas companies and consumers. (5) Dissemination of the experience of 1998 from the preparation of an operation and maintenance manual for Kaunas Gas Company. Dissemination of the ideas to other Lithuanian gas companies. (EHS)

  8. Reasons for decision in the matter of Enbridge Pipelines Inc. Line 4 Extension Project : facilities

    International Nuclear Information System (INIS)

    2008-01-01

    In June 2007, Enbridge Pipelines Inc. applied for approval to extend Line 4 of its Mainline pipeline upstream from Hardisty to Edmonton, Alberta. The project would relieve a potential bottleneck and would also add an additional line across this segment to increase system security and flexibility. The average annual capacity of Line 4 would be 140,000 cubic metres per day. The Enbridge Mainline from Edmonton to Hardisty currently includes 3 oil pipelines, while the Enbridge Mainline downstream of Hardisty includes 4 oil pipelines. This document presented the views of the Board regarding the construction and operation of the project facilities; public and Aboriginal consultation; environmental and socio-economic matters; land matters; tolls and tariffs; and, supply, markets, financing and economics. The Board noted that the benefits of this project outweigh the burdens associated with it. The project required an environmental assessment under the Canadian Environmental Assessment Act which found that it is not likely to cause significant adverse environmental effects. In its approval of the project, the Board attached 15 conditions, including a requirement for Enbridge to file an updated Environmental Protection Plan for the Board's approval. The Board also approved Enbridge's application for its tolling method and to reactivate 3 sections of pre-existing pipeline. 3 tabs., 3 figs., 3 appendices

  9. What's in the Wind? Determining the Properties of Outflowing Gas in Powerful Broad Absorption Line Quasars

    Science.gov (United States)

    Leighly, Karen

    2017-08-01

    A significant fraction of quasars exhibits blueshifted broadabsorption lines (BALs) in their rest-UV spectra, indicating powerfuloutflows emerging from the central engine. These outflows may removeangular momentum to enable black hole growth, enrich the intergalacticmedium with metals, and trigger quenching of star formation ingalaxies. Despite years of study, the physical conditions of theoutflowing gas are poorly understood. The handful of objects that havebeen subjected to detailed analysis are atypical and characterized byrelatively narrow lines where blending is unimportant. However,investigating more powerful BAL quasars will give us better insightinto the types of outflows much more likely to impact galaxyevolution.SimBAL is a novel spectral synthesis fitting method for BAL quasarsthat uses Bayesian model calibration to compare synthetic to observedspectra. With the model inputs of ionization parameter, columndensity, and covering fraction specified, the gas properties givingrise to the BAL features can be determined. We propose to applySimBAL to archival spectra of a sample of 14 luminous BAL quasars to characterize their bulk outflow properties as a function of velocityfor the first time. Our results will show the range of parameterstypical of powerful outflows, an essential step towards constrainingthe physics behind quasar winds and thus their impact on theirenvironments.

  10. WISDOM Project - III. Molecular gas measurement of the supermassive black hole mass in the barred lenticular galaxy NGC4429

    Science.gov (United States)

    Davis, Timothy A.; Bureau, Martin; Onishi, Kyoko; van de Voort, Freeke; Cappellari, Michele; Iguchi, Satoru; Liu, Lijie; North, Eve V.; Sarzi, Marc; Smith, Mark D.

    2018-01-01

    As part of the mm-Wave Interferometric Survey of Dark Object Masses project we present an estimate of the mass of the supermassive black hole (SMBH) in the nearby fast-rotating early-type galaxy NGC4429, that is barred and has a boxy/peanut-shaped bulge. This estimate is based on Atacama Large Millimeter/submillimeter Array (ALMA) cycle-2 observations of the 12CO(3-2) emission line with a linear resolution of ≈13 pc (0.18 arcsec × 0.14 arcsec). NGC4429 has a relaxed, flocculent nuclear disc of molecular gas that is truncated at small radii, likely due to the combined effects of gas stability and tidal shear. The warm/dense 12CO(3-2) emitting gas is confined to the inner parts of this disc, likely again because the gas becomes more stable at larger radii, preventing star formation. The gas disc has a low velocity dispersion of 2.2^{+0.68}_{-0.65} km s-1. Despite the inner truncation of the gas disc, we are able to model the kinematics of the gas and estimate a mass of (1.5 ± 0.1^{+0.15}_{-0.35}) × 108 M⊙ for the SMBH in NGC4429 (where the quoted uncertainties reflect the random and systematic uncertainties, respectively), consistent with a previous upper limit set using ionized gas kinematics. We confirm that the V-band mass-to-light ratio changes by ≈30 per cent within the inner 400 pc of NGC4429, as suggested by other authors. This SMBH mass measurement based on molecular gas kinematics, the sixth presented in the literature, once again demonstrates the power of ALMA to constrain SMBH masses.

  11. Projection of Greenhouse Gas Emissions 2010 to 2030

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Winther, Morten; Nielsen, Malene

    This report contains a description of models, background data and projections of CO2, CH4, N2O, HFCs, PFCs and SF6 for Denmark. The emissions are projected to 2030 using a scenario combined with the expected results of a few individual policy measures. Official Danish forecasts of activity rates ...... on emission data from a considerable number of industrial plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency....

  12. Genetic modification of the human germ line: The reasons why this project has no future.

    Science.gov (United States)

    Morange, Michel

    2015-01-01

    Modification of the human germ line has remained a distant but valuable objective for most biologists since the emergence of genetics (and even before). To study the historical transformations of this project, I have selected three periods - the 1930s, at the pinnacle of eugenics, around 1974 when molecular biology triumphed, and today - and have adopted three criteria to estimate the feasibility of this project: the state of scientific knowledge, the existence of suitable tools, and societal demands. Although the long-awaited techniques to modify the germ line are now available, I will show that most of the expectations behind this project have disappeared, or are considered as being reachable by highly different strategies. Copyright © 2015 Académie des sciences. Published by Elsevier SAS. All rights reserved.

  13. Basic survey project for joint implementation, etc. for associated gas utilization project at Kokdumalak Gas Field in Republic of Uzbekistan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a survey was conducted of the recovery/utilization of the associated gas in the Kokdumalak gas field in the Republic of Uzbekistan. In this area, crude oil and natural gas are produced, but the associated gas, etc. are released burning in the atmospheric air. This plan aims to recover LPG, NGL, etc. from these. In the plan, studies were made on the installation in the Karaulbazar area of production facilities of LPG of 369t/d and NGL of 107t/d by the feed of raw gas of 5,748,000 Sm{sup 3}/d and of LPG storage facilities, and on the installation of a 80km-LPG pipeline. The construction work will start in April, 2001 and is planned to be completed in 33 months. The investment required is estimated at approximately 82,003M US$. The substituting energy generated in this plan will be 168,418 toe/y and will total 5,052,546 toe in the term. Moreover, the reduction in greenhouse effect gas emissions will be 4.52 million t/y in CO2 and will total 135 million t in CO2 in the term. (NEDO)

  14. Draft evaluation of the frequency for gas sampling for the high burnup confirmatory data project

    Energy Technology Data Exchange (ETDEWEB)

    Stockman, Christine T. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Alsaed, Halim A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bryan, Charles R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-03-26

    This report fulfills the M3 milestone M3FT-15SN0802041, “Draft Evaluation of the Frequency for Gas Sampling for the High Burn-up Storage Demonstration Project” under Work Package FT-15SN080204, “ST Field Demonstration Support – SNL”. This report provides a technically based gas sampling frequency strategy for the High Burnup (HBU) Confirmatory Data Project. The evaluation of: 1) the types and magnitudes of gases that could be present in the project cask and, 2) the degradation mechanisms that could change gas compositions culminates in an adaptive gas sampling frequency strategy. This adaptive strategy is compared against the sampling frequency that has been developed based on operational considerations. Gas sampling will provide information on the presence of residual water (and byproducts associated with its reactions and decomposition) and breach of cladding, which could inform the decision of when to open the project cask.

  15. The role of the Industrial Bank of Japan in financing gas projects

    International Nuclear Information System (INIS)

    Kajiwara, Yasushi

    1991-01-01

    This paper concerns liquefied natural gas projects, or LNG projects for short, and more specifically, how the Industrial Bank of Japan, IBJ, as a private bank has been involved in many projects, and how the bank has solved a range of problems encountered in the process of financing such projects. After that, the author's personal views are expressed on how to tackle the future development of LNG, an energy source that will become increasingly important in the future

  16. A review on disaster risk mitigation in the oil and gas project

    Science.gov (United States)

    Rodhi, N. N.; Anwar, N.; Wiguna, I. P. A.

    2018-01-01

    In addition to the very complex risks, hazards potentially lead to disasters in the oil and gas projects. These risks can certainly be anticipated with the application of risk management, but an unsystematic and ineffective implementation of risk management will still bring adverse impacts. According to the eleven risk management principles in ISO 31000:2009, the application of risk management must pay attention to all aspects, both internal and external factors. Thus, this paper aims to identify variables that could affect the disaster mitigation efforts of oil and gas projects. This research began with literature study to determine the problems of risk management in oil and gas projects, so the affecting variables as the study objectives can be specified subsequently based on the literature review as well. The variables that must be considered in the efforts of disaster risk mitigation of oil and gas project are the risk factors and sustainability aspect.

  17. Projection of greenhouse gas emissions 2007 to 2025

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Winther, Morten; Mikkelsen, Mette Hjorth

    This report contains a description of models and background data for projection of CO2, CH4, N2O, HFCs, PFCs and SF6 for Denmark. The emissions are projected to 2025 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity...

  18. Projection of Greenhouse Gas Emissions 2009 to 2030

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Winther, Morten; Mikkelsen, Mette Hjorth

    This report contains a description of models, background data and projections of CO2, CH4, N2O, HFCs, PFCs and SF6 for Denmark. The emissions are projected to 2030 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity r...

  19. Simulation Of The Secondary Cooling System Failed For One Line Mode Of RSG-GAS

    International Nuclear Information System (INIS)

    Dibyo, Sukmanto; Susyadi; Sembiring, Tagor M; Isnaeni, Darwis

    2003-01-01

    Recently, an assessment of 15 MW power reactor RSG-GAS operated using one line cooling mode is under carried out, in which is in the same manner as BA TAN policy. At the power above mentioned, requirement for the research as well as isotop production has been fulfilled. To obtain the transient condition of 1 line-cooling mode, the simulation using RELAP5.MOD3.2 code was carried out. The simulation parameters interesting known are the inlet of primary coolant temperature after failed the secondary cooling system. At the first, reactor is operated at 15 MW steady state condition using 1 line-cooling mode. Primary coolant flow rate of 430 kg/s and secondary of 550 kg/s respectively. After that the decreasing is occurred due to stop of secondary cooling pump. Therefore the primary cooling inlet temperature to the core increase cause scram reactor by inserted control rod. During the transient occur, the characteristic of primary cooling temperature pattern change were obtained. The simulation result shows that the temperature increase (ΔT) temperature to the reactor is 5,1 o C at the second of 85.5. Here is lower than ΔT for the two cooling mode of 10 o C. That temperature characteristic still tolerable against acceptable safety margin to the flow instability

  20. High temperature gasification and gas cleaning – phase II of the HotVegas project

    OpenAIRE

    Meysel, P.; Halama, S.; Botteghi, F.; Steibel, M.; Nakonz, M.; Rück, R.; Kurowski, P.; Buttler, A.; Spliethoff, H.

    2016-01-01

    The primary objective of the research project HotVeGas is to lay the necessary foundations for the long-term development of future, highly efficient high-temperature gasification processes. This includes integrated hot gas cleaning and optional CO2 capture and storage for next generation IGCC power plants and processes for the development of synthetic fuels. The joint research project is funded by the German Federal Ministry of Economics and Technology and five industry partners. It is coordi...

  1. NATURAL GAS SUPPLY PROJECTS FOR EUROPE – SOUTH STREAM AND NABUCCO

    Directory of Open Access Journals (Sweden)

    Domagoj Sučić

    2011-12-01

    Full Text Available South Stream and Nabucco are planned southern corridor projects for natural gas supply to Europe. South Stream is a Russian construction project of the gas pipeline with the capacity of 63 bcm of natural gas per year. It will connect Russia with Austria through Black Sea, Bulgaria, Serbia and Hungary, and with southern Italy through Greece and Ionian Sea, respectively. Nabucco is a European Union planned gas pipeline with the capacity of 31 bcm per year. If built, it will connect Caspian Region and Middle East with Austria through Turkey, Bulgaria, Romania and Hungary. Gas sources for South Stream pipeline are known and available, however it’s construction will be expensive. Nabucco gas pipeline construction costs will be two times less, but the unresolved political relations and non-existent infrastructure have caused it to have no available gas sources at the moment. Countries like Bulgaria and Hungary are involved with both projects, indicating the importance of both projects. In this paper SWOT analysis of the proposed projects was done and it has shown that there is a great chance Nabucco won’t be built if South Stream materializes first (the paper is published in Croatian.

  2. Manitoba Hydro long-term high-voltage transmission line magnetic field monitoring project

    International Nuclear Information System (INIS)

    Wong, P.S.; Ng, C.K.

    2008-01-01

    As part of the licensing process to construct a new 230 kV transmission line on an existing right-of-way in Manitoba, an electrical effects study was conducted in 1998. The study was part of the environmental assessment program crucial in obtaining government approval to construct the line. Some residents living adjacent to the new transmission circuit expressed concerns about alleged adverse health effects associated with long-term exposure to magnetic fields from high voltage transmission lines. In order to verify the accuracy of the predicted magnetic field levels submitted to the regulatory body in the the electrical effects study and to instill confidence in the residents of the affected communities, a three-year magnetic monitoring project was conducted between 2003 and 2005 along the right-of-way after the new 230kV transmission line was energized by Manitoba Hydro. This paper described the monitoring program, with reference to location; equipment; data analysis; and discussion of results. It was concluded that the long-term monitoring project demonstrated that the magnetic field prediction methodology was well understood and accurate, and provided valuable long-term magnetic field characteristics at the edge of the right-of-way. In addition, when there is opposition to a transmission line, public consultation and education were found to be the best options to arrive at a solution. 3 refs., 1 tab., 12 figs

  3. Project W-030 flammable gas verification monitoring test

    International Nuclear Information System (INIS)

    BARKER, S.A.

    1999-01-01

    This document describes the verification monitoring campaign used to document the ability of the new ventilation system to mitigate flammable gas accumulation under steady state tank conditions. This document reports the results of the monitoring campaign. The ventilation system configuration, process data, and data analysis are presented

  4. Prospects of natural gas demand and pipeline projects in the East Asia

    International Nuclear Information System (INIS)

    Ishii, A.

    1997-01-01

    The development of the natural gas industry in East Asia was discussed. It was predicted that by 2010, the demand for natural gas could potentially reach 80 billion cubic feet per day. This represents an 8 per cent per year growth rate from a 1995 baseline. Similarly, it was predicted that by 2010, the region's natural gas supply could potentially reach 65 billion cubic feet per day which would represent 2.5 times the supply of natural gas in 1995. The additional demand will most likely be supplied from the Middle East in the form of liquefied natural gas (LNG), from Eastern Russia through pipelines of LNG, or from North America in the form of LNG. Some gas may also be supplied from Central Asia through pipelines. The price and cost of natural gas are major uncertainties in the future of the East Asian gas demand. Pipeline projects from Russia to China were discussed. Japan and Korea are also interested in collaborating on the feasibility study with Russia and China on a 3,400 km pipeline of 60 inch diameter from the Koviktinskoye gas field through Mongolia to Beijing, Tianjin and Korea, transporting 20 to 30 billion cubic metres of gas annually. A natural gas pipeline project transporting gas from the southern edge of the Sakhalin Island to the Tokyo area was also discussed. The project would involve construction of a 2,200 km 40-48 inch pipeline, much of it undersea, transporting 6 to 12 million tonnes of liquid natural gas, annually

  5. Life Cycle Energy Consumption and Greenhouse Gas Emissions Analysis of Natural Gas-Based Distributed Generation Projects in China

    Directory of Open Access Journals (Sweden)

    Hansi Liu

    2017-10-01

    Full Text Available In this paper, we used the life-cycle analysis (LCA method to evaluate the energy consumption and greenhouse gas (GHG emissions of natural gas (NG distributed generation (DG projects in China. We took the China Resources Snow Breweries (CRSB NG DG project in Sichuan province of China as a base scenario and compared its life cycle energy consumption and GHG emissions performance against five further scenarios. We found the CRSB DG project (all energy input is NG can reduce GHG emissions by 22%, but increase energy consumption by 12% relative to the scenario, using coal combined with grid electricity as an energy input. The LCA also indicated that the CRSB project can save 24% of energy and reduce GHG emissions by 48% relative to the all-coal scenario. The studied NG-based DG project presents major GHG emissions reduction advantages over the traditional centralized energy system. Moreover, this reduction of energy consumption and GHG emissions can be expanded if the extra electricity from the DG project can be supplied to the public grid. The action of combining renewable energy into the NG DG system can also strengthen the dual merit of energy conservation and GHG emissions reduction. The marginal CO2 abatement cost of the studied project is about 51 USD/ton CO2 equivalent, which is relatively low. Policymakers are recommended to support NG DG technology development and application in China and globally to boost NG utilization and control GHG emissions.

  6. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  7. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    International Nuclear Information System (INIS)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park

  8. Assessing the role of renewable energy policies in landfill gas to energy projects

    International Nuclear Information System (INIS)

    Li, Shanjun; Yoo, Han Kyul; Macauley, Molly; Palmer, Karen; Shih, Jhih-Shyang

    2015-01-01

    Methane (CH 4 ) is the second most prevalent greenhouse gas and has a global warming potential at least 28 times as high as carbon dioxide (CO 2 ). In the United States, Municipal Solid Waste (MSW) landfills are reported to be the third-largest source of human-made methane emissions, responsible for 18% of methane emissions in 2011. Capturing landfill gas (LFG) for use as an energy source for electricity or heat produces alternative energy as well as environmental benefits. A host of federal and state policies encourage the development of landfill gas to energy (LFGE) projects. This research provides the first systematic economic assessment of the role of these policies on adoption decisions. Results suggest that Renewable Portfolio Standards and investment tax credits have contributed to the development of these projects, accounting for 13 of 277 projects during our data period from 1991 to 2010. These policy-induced projects lead to 10.4 MMTCO 2 e reductions in greenhouse gas emissions and a net benefit of $41.8 million. - Highlights: • Examine the role of renewable energy policies in landfill gas to energy projects • Renewable Portfolio Standards and investment tax credit had impacts. • Investment tax credit policy is cost-effectiveness in promoting these projects. • Policy-induced projects lead to significant environmental benefits

  9. Introduction to the Gas Hydrate Master Project of Energy National Science and Technology Program of Taiwan

    Science.gov (United States)

    Yang, T. F.; Research Team of Gas Hydrate Project of CGS of Taiwan

    2011-12-01

    Bottom Simulating Reflectors (BSRs), which have been considered as one of major indicators of the gas hydrate in sub-seafloor, have been detected and widely distributed in offshore SW Taiwan. The Central Geological Survey of Taiwan launched a 4-year multidisciplinary gas hydrate investigation program in 2004 to explore the potential of gas hydrate resources in the area. The results indicate that enormous amounts of gas hydrate should occur beneath the seafloor, although none of solid gas hydrate samples have been found. Therefore, a second stage of another 4-year program started in 2008 to extend the studies/investigation. In the ongoing projects, some specific areas will be studied in detail to assess the components of gas hydrate petroleum system and provide a better assessment of the energy resource potential of gas hydrate in the target area. In addition to the field investigations, phase equilibrium of gas hydrate via experiment, theoretical modeling, and molecular simulations has also been studied. The results can provide insights into gas hydrate production technology. Considering the high potential energy resources, the committee of the energy national science and technology program suggests initiating a master project to plan the strategy and timeline for the gas hydrate exploration, exploitation and production in Taiwan. The plan will be introduced in this presentation.

  10. High Temperature Gas-cooled Reactor Projected Markets and Scoping Economics

    Energy Technology Data Exchange (ETDEWEB)

    Larry Demick

    2010-08-01

    The NGNP Project has the objective of developing the high temperature gas-cooled reactor (HTGR) technology to supply high temperature process heat to industrial processes as a substitute for burning of fossil fuels, such as natural gas. Applications of the HTGR technology that have been evaluated by the NGNP Project for supply of process heat include supply of electricity, steam and high-temperature gas to a wide range of industrial processes, and production of hydrogen and oxygen for use in petrochemical, refining, coal to liquid fuels, chemical, and fertilizer plants.

  11. PROJECT OF POLLUTANTS SEPARATOR FROM THE GAS STATION

    Directory of Open Access Journals (Sweden)

    Barbara Kościelnik

    2016-06-01

    Full Text Available Oily wastewater are dangerous for the environment, because they can contaminate ground water or surface, which can lead to contamination of the biosystem or poisoning of humans and animals. The treatment plant of this kind may include petroleum products or substances derived from natural gas, crude oil, asphalt or natural wax. Of course, in the wastewater oily you cannot forget about vegetable oils used in catering. Waste water of this type to be cleaned are subjected to the following processes: flotation, sedimentation, filtration, flowing out, thermal methods, biodegradation, adsorption or chemical and thermal methods to destabilize the emulsion. The aim of this study was to design a separator pollution from the gas station. We present the investment and operating costs. In designing the system chosen individual process units based on the requirements of the quality of wastewater specified in PN - EU 858.

  12. Bolivia-Brazil natural gas project: Challenges and solutions

    International Nuclear Information System (INIS)

    Bassani, A.

    1993-01-01

    The development of the natural gas reserves in Bolivia and Brazil is discussed. The development of these reserves is being conducted by the Private Corporation for Gas Development. The Corporation was created to promote participation of the private sector in an area that was exclusively managed by federal or state governments. In order to promote participation by the private sector and at the same time to motivate foreign investors, the corporation is conducting a program of activities and studies that includes a legal and institutional analysis, a feasibility study in accordance with the viewpoints of the private sector, and also the structure of a business development plan, according to the perspective of private investors

  13. Oil and gas projects in Amazon: an environmental challenge; Projetos de petroleo e gas na Amazonia: um desafio ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Taam, Mauricio [Agencia Nacional do Petroleo, Gas Natural e Biocombustiveis (ANP), Rio de Janeiro, RJ (Brazil); Cabral, Nelson [PETROBRAS, Rio de Janeiro, RJ (Brazil). Regional Norte SMS ; Cardoso, Vanderlei [TRANSPETRO, Rio de Janeiro, RJ (Brazil). Gerencia de Seguranca, Meio Ambiente e Saude

    2004-07-01

    In the heart of the Amazon forest, some 600 km from the city of Manaus, the Brazilian Oil Company - PETROBRAS - is developing the 'URUCU PROJECT'. Consisting on 3 oil and gas production fields and 3 natural gas processing plant, 2 huge pipelines crossing the dense Amazon forest and its rivers and going towards COARI - the Fluvial Terminal of Solimoes river. Then, vessels and ferries, loads LGN to the north region and oil to feed the Manaus refinery plant. In a near future natural gas pipelines will connect COARI to Manaus and URUCU to Porto Velho. The whole project will allow energy supply to the less developed and isolated region of Brazil, and brings relief for the local population, but represents one of the biggest challenges for the oil and gas industry in terms of environmental sustainability for projects in very sensitive areas. The paper concludes that it is viable to face such a challenges counting on an Environmental Management System tailored to fit the region peculiarities, including a high level of Preparedness and Response for oil incidents, and last but never least assuming a respectful attitude towards the Amazon and its people. (author)

  14. Capital structure in LNG infrastructures and gas pipelines projects: Empirical evidences and methodological issues

    International Nuclear Information System (INIS)

    Pierru, Axel; Roussanaly, Simon; Sabathier, Jérôme

    2013-01-01

    This paper provides new empirical insights on the capital structure of project-financed LNG infrastructures and gas pipeline projects, by using data relating to projects whose financial close occurred between June 2004 and March 2011. Most results are consistent with the basic view of risk-averse funds suppliers. Especially, the projects located in risky countries and larger projects tend to exhibit lower debt ratios and less-concentrated equity ownerships. In addition, regasification projects appear to have a more diluted equity ownership. Methodological issues raised by the financing of these projects are also examined from a capital-budgeting perspective. In particular, the equity residual method, usually used by industrial practitioners to value these projects, should be adjusted. - Highlights: • This paper provides new empirical insights on the capital structure of project-financed LNG and gas pipeline infrastructures. • Most of our results are consistent with the basic view of risk-averse funds suppliers. • Projects located in risky countries exhibit lower debt ratios and less-concentrated equity ownerships. • Larger projects and regasification projects also have less concentrated equity ownerships. • From a capital-budgeting viewpoint, we examine methodological issues raised by the financing of these projects

  15. Bypassing Russia: Nabucco project and its implications for the European gas security

    International Nuclear Information System (INIS)

    Erdogdu, Erkan

    2010-01-01

    Restrictions on CO 2 emissions, the nuclear phase-out announced by some member states, high emissions from coal-fired power plants, and barriers to rapid development of renewable generation are factors that make the European Union (EU) highly dependent on natural gas. With three non-EU countries (Russia, Algeria and Norway) currently supplying more than half the gas consumed within the EU and with projections pointing out that by 2030 internal sources will only be able to meet 25% of demand, the EU desperately looks for means to secure new sources of gas supply. In this context, the Nabucco pipeline is planned to deliver gas from Caspian and Middle East regions to the EU market. It runs across Turkey and then through Bulgaria, Romania and Hungary before connecting with a major gas hub in Austria. On paper, Nabucco project makes perfect sense, offering a new export route to the EU markets for Caspian gas producers (Azerbaijan, Turkmenistan and Kazakhstan) as well as Iran and, in time, Iraq. The project is backed by the EU and strongly supported by the United States. Perhaps most importantly, Nabucco would completely bypass Russia. This paper addresses issues surrounding Nabucco project and their implications for the European gas security. (author)

  16. Numerical Calculation of Transient Thermal Characteristics in Gas-Insulated Transmission Lines

    Directory of Open Access Journals (Sweden)

    Hongtao Li

    2013-11-01

    Full Text Available For further knowledge of the thermal characteristics in gas-insulated transmission lines (GILs installed above ground, a finite-element model coupling fluid field and thermal field is established, in which the corresponding assumptions and boundary conditions are given.  Transient temperature rise processes of the GIL under the conditions of variable ambient temperature, wind velocity and solar radiation are respectively investigated. Equivalent surface convective heat transfer coefficient and heat flux boundary conditions are updated in the analysis process. Unlike the traditional finite element methods (FEM, the variability of the thermal properties with temperature is considered. The calculation results are validated by the tests results reported in the literature. The conclusion provides method and theory basis for the knowledge of transient temperature rise characteristics of GILs in open environment.

  17. Piercing the sovereign ceiling: Issues in oil and gas project financing

    International Nuclear Information System (INIS)

    Coleman, T.S.

    1998-01-01

    In the oil and gas sector, corporations and governments face huge capital spending requirements in order to transform large resource discoveries into producing, cash-generating assets. A significant portion of this funding is expected to be done on a project finance basis, where bank lenders or bond investors take a secured position in financing a discrete project, with the expectation of being paid back by the cash flows from that project after completion. This trend is increasing demand for crediting rating services to provide credit ratings for these project financings. A key challenge is to analyze and rate credit-worthy projects in countries that have relatively low foreign currency sovereign ceilings due to economic, political, and financial risks. In most cases, the credit ratings for projects financed in currencies outside the host country are capped at the country''s foreign currency ceiling. However, in a few instances, mainly in the oil and gas sector, Moody''s has pierced the foreign currency ceiling or rated certain projects above the sovereign ratings of the countries where they are domiciled. The purpose of this article is to briefly explain some of the qualitative factors and considerations that have allowed Moody''s to pierce the ceiling in the oil and gas sector, with a focus on two recent and noteworthy projects: Ras Laffan Liquefied Natural Gas in Qatar and Petrozuata in Venezuela

  18. Gas Regional Initiative. North West Regional Energy Market. Transmission Transparency Project. First Implementation Report

    International Nuclear Information System (INIS)

    2008-07-01

    The purpose of this report is to comment on the implementation of the TSO Transmission Transparency Project. In December 2007 sixteen TSOs presented a project plan which committed them to publishing information on capacity availability and gas flows at crossborder interconnection points in the North-West gas region. The data types to be published were agreed between TSOs and network users. It was agreed that TSOs would release new information on capacity and actual gas flows at crossborder interconnection points. The TSOs have committed to publishing the agreed information by three project milestones May, September or December 2008. At the end of May 2008 the TSOs submitted initial data to Ofgem (Office of the Gas and Electricity Markets) on implementation. This report presents the data submitted by the TSOs, provides comment on implementation progress and explains the next steps. This report does not approve or guarantee the accuracy of the data submitted by TSOs

  19. Projection of greenhouse gas emissions - 2005 to 2030

    International Nuclear Information System (INIS)

    Illerup, J.B.; Nielsen, Ole-Kenneth; Winther, Morten; Hjort Mikekkelsen, M.; Lyck, E.; Nielsen, Malene; Hoffmann, L.; Gyldenkaerne, S.; Thomsen, Marianne

    2007-01-01

    This report contains a description of models and background data for projection of CO 2 , CH 4 , N 2 O, HFCs, PFCs and SF 6 for Denmark. The emissions are projected to 2030 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity rates are used in the models for those sectors for which the forecasts are available, i.e. the latest official forecast from the Danish Energy Authority. The emission factors refer to international guidelines and some are country-specific and refer to Danish legislation, Danish research reports or calculations based on emission data from a considerable number of plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency. (au)

  20. Projection of greenhouse gas emissions 2010 to 2030

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Ole-Kenneth; Winther, M.; Nielsen, Malene; Hjorth Mikkelsen, M.; Albrektsen, R.; Gyldenkaerne, S.; Plejdrup, M.; Hoffmann, L.; Thomsen, M.; Hjelgaard, K.; Fauser, P.

    2011-09-15

    This report contains a description of models, background data and projections of CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6} for Denmark. The emissions are projected to 2030 using a scenario together with the expected results of a few individual policy measures. Official Danish forecasts of activity rates are used in the models for those sectors for which the forecasts are available, i.e. the latest official forecast from the Danish Energy Agency. The emission factors refer to international guidelines and some are country-specific and refer to Danish legislation, Danish research reports or calculations based on emission data from a considerable number of industrial plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency. (Author)

  1. Projection of greenhouse gas emissions 2007 to 2025

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Ole-Kenneth; Winther, M.; Hjorth Mikkelsen, M.; Gyldenkaerne, S.; Lyck, E.; Plejdrup, M.; Hoffmann, L.; Thomsen, Marianne; Fauser, P.

    2009-02-15

    This report contains a description of models and background data for projection of CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6} for Denmark. The emissions are projected to 2025 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity rates are used in the models for those sectors for which the forecasts are available, i.e. the latest official forecast from the Danish Energy Agency. The emission factors refer to international guidelines and some are country-specific and refer to Danish legislation, Danish research reports or calculations based on emission data from a considerable number of plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency. (au)

  2. Projection of greenhouse gas emissions 2009 to 2030

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Ole-Kenneth; Winther, M.; Hjorth Mikkelsen, M.; Gyldenkaerne, S.; Lyck, E.; Plejdrup, M.; Hoffmann, L.; Thomsen, M.; Hjelgaard, K.; Fauser, P.

    2010-09-15

    This report contains a description of models, background data and projections of CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6} for Denmark. The emissions are projected to 2030 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity rates are used in the models for those sectors for which the forecasts are available, i.e. the latest official forecast from the Danish Energy Agency. The emission factors refer to international guidelines and some are country-specific and refer to Danish legislation, Danish research reports or calculations based on emission data from a considerable number of plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency. (Author)

  3. Projection of greenhouse gas emissions - 2005 to 2030

    Energy Technology Data Exchange (ETDEWEB)

    Illerup, J.B.; Nielsen, Ole-Kenneth; Winther, Morten; Hjort Mikekkelsen, M.; Lyck, E.; Nielsen, Malene; Hoffmann, L.; Gyldenkaerne, S.; Thomsen, Marianne [DMU-AU, Dept. of Policy Analysis (Denmark)

    2007-01-15

    This report contains a description of models and background data for projection of CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6} for Denmark. The emissions are projected to 2030 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity rates are used in the models for those sectors for which the forecasts are available, i.e. the latest official forecast from the Danish Energy Authority. The emission factors refer to international guidelines and some are country-specific and refer to Danish legislation, Danish research reports or calculations based on emission data from a considerable number of plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency. (au)

  4. Gas projects surge in the Middle East as governments seek new revenue sources

    International Nuclear Information System (INIS)

    Williams, M.D.

    1997-01-01

    The rapid development of natural gas and condensate reserves in the Middle East results from a simple motivation: the desire of governments to earn revenues. For the past decade, Middle East governments have run budget deficits, which they funded by drawing down foreign assets and issuing debt. Now in the process of structural economic reform, they have begun to use an under-utilized resource--natural gas, of which Middle East governments own about one third of the world's reserves. Governments receive revenues from several sources in natural gas developments, which makes the projects very attractive. Revenue comes from the sale of the natural gas in the domestic market and, if exported, the international market; the sale of associated condensates; the additional exports of crude oil or refined products if natural gas is substituted for refined products in domestic markets; the increased sale of crude oil if natural gas is injected into reservoirs to maintain pressure; and the sale of petrochemicals where natural gas is used as feedstock. Large projects under way in the Middle East highlight the consequences of multiple revenue sources and interlinked costs of natural gas and condensate development. Other countries in the region are undertaking similar projects, so examples cited represent only a portion of what is occurring. The paper describes Abu Dhabi, Qatar, Saudi Arabia, and Iran

  5. Gas reactor in-pile safety test project (GRIST-2)

    International Nuclear Information System (INIS)

    Kelley, A.P. Jr.; Arbtin, E.; St Pierre, R.

    1979-01-01

    Although out-of-pile tests may be expected to confirm individual phenomena models in core disruptive accident analysis codes, only in-pile tests are capable of verifying the extremely complex integrated model effects within the appropriate time phase for these accidents. For this reason, the GRIST-2 project, the purpose of which is to design and construct an in-pile helium loop capable of transient safety testing in the TREAT facility in Idaho, forms a cornerstone of the US GCFR safety program. The project organization, experiment program, facility, helium system design, and schedule which have been selected to meet the objectives are described

  6. The anatomy and importance of project finance for oil and gas developments

    International Nuclear Information System (INIS)

    Whyatt, A.S.

    1992-01-01

    This paper reports that project financing can be of great benefit to oil and gas projects because by separately identifying and securing assets and cashflows it can provide large sums not otherwise accessible to whole projects or to individual companies. Project financing is of interest to members of the SPE because it routinely requires the expertise of petroleum engineers and other professionals to vouch for the viability of petroleum projects and the recoverability of reserves. its essential attraction is that risk analysis and the application of precise professional criteria enable large projects and amounts to be financed, which otherwise might not occur. This is particularly the case when there are a number of participants in a large project, none of which is on its own able to support the finance. The growth in the average size of projects means that an increasing number of projects must be financed in this way or not be able to go forward

  7. The development of Middle Eastern gas: analyses of the graveyard of export projects

    International Nuclear Information System (INIS)

    Mabro, Robert

    1994-01-01

    There are three types of opportunities for gas developments in the Middle East. The first are those provided by the domestic energy market, the second by regional trade and the third by the potential for exports outside the region. The development of the full gas potential of the region, given the size of the reserves held by several countries, will only be possible through export. Of course, there is still room for the expansion of gas use within the producing countries and their regional neighbours but growth of domestic demand would not make a significant dent in the regional reserves before several decades. The potential for exports is constrained, however, by the uncertainty about future oil prices, the long lead-in time of major gas projects and the associated financing problems. There is a graveyard of gas export projects in the Middle East. New projects are continually conceived and then abandoned or indefinitely postponed. Even the famous Qatargas project which took so long to bring to the threshold of implementation appears in the present climate to be unattractive for both the country and the foreign investors involved. Gas in the Middle East will remain for a very long time a resource for an ever more distant future. There is still too much oil around for its price to rise to a support level for big gas projects in the Middle East. And there is no significant demand yet in Europe for Middle East oil which only leaves the Far East as a potential market. The paradox is that if gas resources are not developed ahead of needs, gas will not be available in sufficient volumes when required. (Author)

  8. The Help-line "Invito alla Vita": a new project for suicide prevention in Trentino region.

    Science.gov (United States)

    Di Napoli, Wilma; Andreatta, Olaf

    2014-11-01

    "Invito alla Vita" is a community-based suicide prevention project that officially started in Trentino in late 2008. The project was promoted by the local Health Services, trying from the beginning to involve other community subjects, and has been working over five years and a half in different directions, particularly promoting a phone help-line. The aims of the Invito alla Vita (IaV) Help Line have been clear from the beginning: decrease the sense of loneliness, offer encouragement and support, promote engagement with health services, reduce stigma and prejudice. Contrary to popular misconceptions, talking with people about suicide will not increase suicide risk, neither will it induce patients to commit suicide.The volunteers involved in the IaV help-line offer people empathic listening without judgment and easy tips, to reduce loneliness, sadness and supply reassurance that other people care. In this study we tried to deepen our knowledges about the volunteers' motivations and necessities to use them for creating a better system of support: we realized indeed that continuous training and supervision, along with official awards given by community institutions, are basic factors to sustain the volunteers' motives to cooperate with the help line.

  9. Gas dynamic design of the pipe line compressor with 90% efficiency. Model test approval

    Science.gov (United States)

    Galerkin, Y.; Rekstin, A.; Soldatova, K.

    2015-08-01

    Gas dynamic design of the pipe line compressor 32 MW was made for PAO SMPO (Sumy, Ukraine). The technical specification requires compressor efficiency of 90%. The customer offered favorable scheme - single-stage design with console impeller and axial inlet. The authors used the standard optimization methodology of 2D impellers. The original methodology of internal scroll profiling was used to minimize efficiency losses. Radically improved 5th version of the Universal modeling method computer programs was used for precise calculation of expected performances. The customer fulfilled model tests in a 1:2 scale. Tests confirmed the calculated parameters at the design point (maximum efficiency of 90%) and in the whole range of flow rates. As far as the authors know none of compressors have achieved such efficiency. The principles and methods of gas-dynamic design are presented below. The data of the 32 MW compressor presented by the customer in their report at the 16th International Compressor conference (September 2014, Saint- Petersburg) and later transferred to the authors.

  10. SDSS-IV MaNGA: the impact of diffuse ionized gas on emission-line ratios, interpretation of diagnostic diagrams and gas metallicity measurements

    Science.gov (United States)

    Zhang, Kai; Yan, Renbin; Bundy, Kevin; Bershady, Matthew; Haffner, L. Matthew; Walterbos, René; Maiolino, Roberto; Tremonti, Christy; Thomas, Daniel; Drory, Niv; Jones, Amy; Belfiore, Francesco; Sánchez, Sebastian F.; Diamond-Stanic, Aleksandar M.; Bizyaev, Dmitry; Nitschelm, Christian; Andrews, Brett; Brinkmann, Jon; Brownstein, Joel R.; Cheung, Edmond; Li, Cheng; Law, David R.; Roman Lopes, Alexandre; Oravetz, Daniel; Pan, Kaike; Storchi Bergmann, Thaisa; Simmons, Audrey

    2017-04-01

    Diffuse ionized gas (DIG) is prevalent in star-forming galaxies. Using a sample of 365 nearly face-on star-forming galaxies observed by Mapping Nearby Galaxies at APO, we demonstrate how DIG in star-forming galaxies impacts the measurements of emission-line ratios, hence the interpretation of diagnostic diagrams and gas-phase metallicity measurements. At fixed metallicity, DIG-dominated low ΣHα regions display enhanced [S II]/Hα, [N II]/Hα, [O II]/Hβ and [O I]/Hα. The gradients in these line ratios are determined by metallicity gradients and ΣHα. In line ratio diagnostic diagrams, contamination by DIG moves H II regions towards composite or low-ionization nuclear emission-line region (LI(N)ER)-like regions. A harder ionizing spectrum is needed to explain DIG line ratios. Leaky H II region models can only shift line ratios slightly relative to H II region models, and thus fail to explain the composite/LI(N)ER line ratios displayed by DIG. Our result favours ionization by evolved stars as a major ionization source for DIG with LI(N)ER-like emission. DIG can significantly bias the measurement of gas metallicity and metallicity gradients derived using strong-line methods. Metallicities derived using N2O2 are optimal because they exhibit the smallest bias and error. Using O3N2, R23, N2 = [N II]/Hα and N2S2Hα to derive metallicities introduces bias in the derived metallicity gradients as large as the gradient itself. The strong-line method of Blanc et al. (IZI hereafter) cannot be applied to DIG to get an accurate metallicity because it currently contains only H II region models that fail to describe the DIG.

  11. Spectral radiance of strong lines in positive column mercury discharges with argon carrier gas

    International Nuclear Information System (INIS)

    Sansonetti, Craig J; Reader, Joseph

    2006-01-01

    The spectral radiance of the 185 and 254 nm lines in two positive column mercury discharge lamps was measured over a wide range of operating conditions. The lamps had internal diameters of 5 and 23 mm. Argon was used as a carrier gas. The lamps were operated with cold spot temperatures of 20, 40 and 60 0 C. At each of these temperatures, results were obtained for five currents ranging from 20 to 100 mA for the 5 mm lamp and from 200 to 1000 mA for the 23 mm lamp. For each current studied, results were determined for argon pressures ranging from 66.6 to 666 Pa (0.5 to 5.0 Torr) in the 5 mm lamp and 26.6 to 666 Pa (0.2 to 5.0 Torr) in the 23 mm lamp. An argon miniarc was used as the radiometric standard. By calibrating the spectral response of the optical system with a well-characterized mercury pencil lamp, results were obtained for 12 additional Hg lines from 289 to 579 nm. For the 23 mm lamp the electric field in the positive column was measured. For this lamp the radiated power as a percentage of input power was also determined. The results provide an experimental basis for validating computer models of Hg fluorescent lamp discharges

  12. Fault location method for unexposed gas trunk line insulation at stray current constant effect area

    Science.gov (United States)

    Tsenev, A. N.; Nosov, V. V.; Akimova, E. V.

    2017-10-01

    For the purpose of gas trunk lines safe operation, two types of pipe wall metal anticorrosion protection are generally used - the passive (insulation coating) protection and the active (electrochemical) protection. In the process of a pipeline long-term operation, its insulation is subject to wear and damage. Electrochemical protection means of a certain potential value prevent metal dissolution in the soil. When insulation wear and tear attains a level of insufficiency of the protection potential value, the insulating coating needs repair which is a labor-consuming procedure. To reduce the risk of such situation, it is necessary to make inspection rounds to monitor the condition of pipe insulation. A method for pipeline insulation coating unexposed fault location based on Pearson method is considered, wherein a working cathodic protection station signal of 100 Hz frequency is used, which makes installation of a generator unnecessary, and also a specific generator signal of 1 kHz frequency is used at high noise immunity and sensitivity of the instrument complex. This method enables detection and sizing of unexposed pipeline defects within the zones of earth current permanent action. High noise immunity of selective indicators allows for operation in proximity to 110 kV, 220 kV, and 500 kV power transmission lines in action.

  13. Demand of natural gas; methodology for their projection

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    1999-01-01

    The objective of integrated energetic planning process, is to propose political that assure the full supply of energy in the country, at competitive costs and with a rational use of the resources. Of there that it requires the periodic analysis of the information on the sectors of energy supplies and demand and on their interrelation with the economic, social and environmental environment. Among the variables that should stay upgraded during the planning process, it stands out the energy demand. The fact of to evaluate and to project demands goes to predict the consumer's of energy low uncertain conditions future behavior that it can affect the prospective results, so much in the short term as in the long term. One of the alternatives to face the uncertainty has more than enough future events it consists on building scenarios in those that values different from the variables that are considered with more incidences in the projected results participate. In the case of the energy, the variables that, generally, they are considered determinant, are the economic growth, the prices variation, the technological developments, the substitution among energy, the change of patterns of the population's consumption and the rational use of the energy. The application of the methodology of scenarios allows to settle down, for this case, bands of projection of the energy demand, in global form or for each energy type, specify in each sector and for each use. Once it is had the projection band, it is possible to determine the half growth of long term. The energy planning should respond in immediate form to the scenario changes, through the revision of the state projections. A frequent error, typical of the old sub-sector planning, consists on maintaining, in an irrational way, established growth percentages, when they intend new scenarios of economic growth

  14. Understanding and managing leakage in forest-based greenhouse-gas-mitigation projects.

    Science.gov (United States)

    Schwarze, Reimund; Niles, John O; Olander, Jacob

    2002-08-15

    A major concern about land use, land-use change and forestry (LULUCF) projects under the Clean Development Mechanism (CDM) is the potential for leakage. Leakage refers to a net increase of greenhouse-gas emissions in an area outside the project resulting from the CDM activity. This paper provides an overview of leakage, its definitions and its causes. It describes ways that LULUCF projects may suffer from leakage and attempts to assess the magnitude of leakage risks for different LULUCF project types. It also summarizes some of the approaches, both in terms of policies and project development, to address LULUCF leakage.

  15. Basic study for Joint Implementation Pipeline System Optimization Project including rehabilitation of gas pipeline in Ukraine for greenhouse gas reduction

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a study was conducted of a project for repair/optimization of the Shebelinka, Dikanka-Kyiv, gas pipeline system in the Republic of Ukraine. As a result of the study, the following plans were proposed. The gas turbine compressor now in use has been used more than 30 years, and is needed to be changed due to the superannuation. Changes are needed of the equipment used for pipeline inspection, corrosion prevention equipment, damaged data collecting equipment, pressure detection automatic drive valve, etc. Further needed are a portable compressor by which repair work can be done without gas release into the atmospheric air. The investment required for repair/installation of these equipment totaled approximately 216 million dollars. This brings the reduction in greenhouse effect gas emissions of 512,000 tons/year, and the energy conservation of 103,000 tons/year of crude oil or its equivalent. These are estimated at about 10 million dollars in greenhouse effect gas reduction and at 15 million dollars in energy conservation. (NEDO)

  16. On-line fission products measurements during a PWR severe accident: the French DECA-PF project

    Energy Technology Data Exchange (ETDEWEB)

    Ducros, G.; Allinei, P.G.; Roure, C. [CEA, DEN, F-13108 Saint-Paul-lez-Durance, (France); Rozel, C. [EDF SEPTEN, 12-14 Avenue Dutrievoz, F-69628, Villeurbanne, (France); Blanc De Lanaute, N. [CANBERRA, 1 rue des Herons, F-78182, Saint Quentin en Yvelines, (France); Musoyan, G. [AREVA, Tour AREVA, 1 place Jean Millier, F-92084 Paris La Defense Cedex, (France)

    2015-07-01

    : - Gamma spectrometry, with an industrial objective to build a prototype aimed at improving the capacity of the present radiation monitoring system, - Gas chromatography, for the quantification of the fission gases (Xe, Kr) as well as potential carbon oxides produced in case of Molten Corium Concrete Interaction, - Optical absorption spectroscopy, the objective of this most innovative technique being to quantify the tetra-oxide of ruthenium, which could be produced in case of lower head failure, and the gaseous forms of iodine (molecular and organic) released in the environment. A global description and the present status of this project is presented, focusing on the Source Term establishment at the outlet stack of the sand bed filters and on the perspectives of implementation of the on-line gamma spectrometry equipment. (authors)

  17. On-line system on the base of the ELEKTRONIKA D3-28 microcomputer for gas filling

    International Nuclear Information System (INIS)

    Artemov, A.A.; Baranchuk, N.S.; Livitskij, M.M.; Platonov, V.P.; Chernyak, V.Ya.

    1989-01-01

    On-line system for gas filling on the base of SNA-1 pressure controller, ELEKTRONIKA D3-28 microcomputer and interface device and program for information exchange within the system are described. The system is designed for on-line measurement of gas pressure and filling and is used during operation without pumping out. Volume of vacuum chamber is 0.8 m 3 , pressure of filled-out gas (nitrogen) is 1 atm. The system enables to change pressure up to 0.1 Torr with 1x10 -4 Torr accuracy. Actuation time of g as filling-on system is determined with program control and depends on pressure measurement. Minimal actuation time of gas filling-on system is determined with program control and depends on pressure measurement. Minimal actuation time is 12 ms

  18. THE LICK AGN MONITORING PROJECT: REVERBERATION MAPPING OF OPTICAL HYDROGEN AND HELIUM RECOMBINATION LINES

    International Nuclear Information System (INIS)

    Bentz, Misty C.; Walsh, Jonelle L.; Barth, Aaron J.; Thornton, Carol E.; Yoshii, Yuzuru; Sakata, Yu; Minezaki, Takeo; Woo, Jong-Hak; Malkan, Matthew A.; Wang, Xiaofeng; Steele, Thea N.; Silverman, Jeffrey M.; Serduke, Frank J. D.; Li, Weidong; Lee, Nicholas; Treu, Tommaso; Street, Rachel A.; Hidas, Marton G.; Hiner, Kyle D.; Greene, Jenny E.

    2010-01-01

    .54:1.00:0.61:0.36:0.25. Further confirmation of photoionization predictions for broad-line gas behavior will require additional monitoring programs for these AGNs while they are in different luminosity states.

  19. Cost Minimization Model of Gas Transmission Line for Indonesian SIJ Pipeline Network

    Directory of Open Access Journals (Sweden)

    Septoratno Siregar

    2003-05-01

    Full Text Available Optimization of Indonesian SIJ gas pipeline network is being discussed here. Optimum pipe diameters together with the corresponding pressure distribution are obtained from minimization of total cost function consisting of investment and operating costs and subjects to some physical (Panhandle A and Panhandle B equations constraints. Iteration technique based on Generalized Steepest-Descent and fourth order Runge-Kutta method are used here. The resulting diameters from this continuous optimization are then rounded to the closest available discrete sizes. We have also calculated toll fee along each segment and safety factor of the network by determining the pipe wall thickness, using ANSI B31.8 standard. Sensitivity analysis of toll fee for variation of flow rates is shown here. The result will gives the diameter and compressor size and compressor location that feasible to use for the SIJ pipeline project. The Result also indicates that the east route cost relatively less expensive than the west cost.

  20. Laser absorption spectroscopy of water vapor confined in nanoporous alumina: wall collision line broadening and gas diffusion dynamics.

    Science.gov (United States)

    Svensson, Tomas; Lewander, Märta; Svanberg, Sune

    2010-08-02

    We demonstrate high-resolution tunable diode laser absorption spectroscopy (TDLAS) of water vapor confined in nanoporous alumina. Strong multiple light scattering results in long photon pathlengths (1 m through a 6 mm sample). We report on strong line broadening due to frequent wall collisions (gas-surface interactions). For the water vapor line at 935.685 nm, the HWHM of confined molecules are about 4.3 GHz as compared to 2.9 GHz for free molecules (atmospheric pressure). Gas diffusion is also investigated, and in contrast to molecular oxygen (that moves rapidly in and out of the alumina), the exchange of water vapor is found very slow.

  1. The Saskatchewan Environmental Assessment Act Guide to Proposal Development : oil and natural gas projects

    International Nuclear Information System (INIS)

    1999-02-01

    The manner in which requests for review of oil and natural gas projects are to be provided under the Environmental Assessment Act in Saskatchewan is described. The provisions of the Guide apply to all seismic projects on private or Crown lands, all drilling projects, flowline projects, access routes and production facilities on any land, except where the project is on cultivated land where it does not interfere with water bodies or endangered species. It also applies to any project that has the potential to meet the definition of 'development' under the Environmental Assessment Act. Basically, the following information is required for all proposals: (1) project description, (2) project evaluation, (3) description of proposed waste management practices, and (4) description of the proposed environmental monitoring. 4 refs

  2. Cost/CYP: a bottom line that helps keep CSM projects cost-efficient.

    Science.gov (United States)

    1985-01-01

    In contraceptive social marketing (CSM), the objective is social good, but project managers also need to run a tight ship, trimming costs, allocating scarce funds, and monitoring their program's progress. 1 way CSM managers remain cost-conscious is through the concept of couple-years-of-protection (CYP). Devised 2 decades ago as an administrative tool to compare the effects of different contraceptive methods, CYP's uses have multiplied to include assessing program output and cost effectiveness. Some of the factors affecting cost/CYP are a project's age, sales volume, management efficiency, and product prices and line. These factors are interconnected. The cost/CYP figures given here do not include outlays for commodities. While the Agency for International Development's commodity costs alter slightly with each new purchase contrast, the agency reports that a condom costs about 4 cents (US), an oral contraceptive (OC) cycle about 12 cents, and a spermicidal tablet about 7 cents. CSM projects have relatively high start-up costs. Within a project's first 2 years, expenses must cover such marketing activities as research, packaging, warehousing, and heavy promotion. As a project ages, sales should grow, producing revenues that gradually amortize these initial costs. The Nepal CSM project provides an example of how cost/CYP can improve as a program ages. In 1978, the year sales began, the project's cost/CYP was about $84. For some time the project struggled to get its products to its target market and gradually overcome several major hurdles. The acquisition of jeeps eased distribution and, by adding another condom brand, sales were increased still more, bringing the cost/CYP down to $8.30 in 1981. With further sales increases and resulting revenues, the cost/CYP dropped to just over $7 in 1983. When the sales volume becomes large enough, CSM projects can achieve economies of scale, which greatly improves cost-efficiency. Fixed costs shrink as a proportion of total

  3. Estimating the greenhouse gas benefits of forestry projects: A Costa Rican Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Busch, Christopher; Sathaye, Jayant; Sanchez Azofeifa, G. Arturo

    2000-09-01

    If the Clean Development Mechanism proposed under the Kyoto Protocol is to serve as an effective means for combating global climate change, it will depend upon reliable estimates of greenhouse gas benefits. This paper sketches the theoretical basis for estimating the greenhouse gas benefits of forestry projects and suggests lessons learned based on a case study of Costa Rica's Protected Areas Project, which is a 500,000 hectare effort to reduce deforestation and enhance reforestation. The Protected Areas Project in many senses advances the state of the art for Clean Development Mechanism-type forestry projects, as does the third-party verification work of SGS International Certification Services on the project. Nonetheless, sensitivity analysis shows that carbon benefit estimates for the project vary widely based on the imputed deforestation rate in the baseline scenario, e.g. the deforestation rate expected if the project were not implemented. This, along with a newly available national dataset that confirms other research showing a slower rate of deforestation in Costa Rica, suggests that the use of the 1979--1992 forest cover data originally as the basis for estimating carbon savings should be reconsidered. When the newly available data is substituted, carbon savings amount to 8.9 Mt (million tones) of carbon, down from the original estimate of 15.7 Mt. The primary general conclusion is that project developers should give more attention to the forecasting land use and land cover change scenarios underlying estimates of greenhouse gas benefits.

  4. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Science.gov (United States)

    2010-06-10

    ... financial condition and has the ability to secure the necessary financing to meet the Project's requirements... for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy..., Department of Energy. ACTION: Request for Project Proposals. SUMMARY: The Department of Energy (DOE or...

  5. Radioactive liquid wastes lines removal project at Los Alamos (1981-1986)

    International Nuclear Information System (INIS)

    Elder, J.C.; Cox, E.J.; Hohner, D.P.; Valentine, A.M.

    1986-09-01

    This report describes the abandoned liquid waste lines removal operations conducted at Los Alamos in the period 1981 to 1986. Particular emphasis has been placed on as-left conditions, that is, on the location of sections of waste lines or contaminated soil which were left in place on the basis of ALARA decisions. Contaminated items were left when interfering utilities, roads, structures, or great depth made complete removal not cost effective or not safe. Left items were either not highly contaminated or they were not near the surface. Total cost of the project was $4.2 million. Approximately 5800 m 3 of contaminated waste was placed in the Solid Waste Management Site at TA-54 Area G. The project accomplished the removal of approximately 34,500 ft (6.5 miles) of abandoned waste lines under carefully controlled conditions. Procedures for excavation, waste disposal, personnel protection, and radiation monitoring are described. Environmental monitoring criteria and methods for determining acceptable levels of contamination in soils and on surfaces are discussed

  6. Greenhouse gas emissions trading and project-based mechanisms. Proceedings - CATEP

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-01-01

    Greenhouse gas emissions trading and project-based mechanisms for greenhouse gas reduction are emerging market-based instruments for climate change policy. This book presents a selection of papers from an international workshop co-sponsored by the OECD and Concerted Action on Tradeable Emissions Permits (CATEP), to discuss key research and policy issues relating to the design and implementation of these instruments. The papers cover the experience of developing and transition countries with greenhouse gas emissions trading and project-based mechanisms. In addition, the papers examine the use of tradeable permits in policy mixes and harmonisation of emissions trading schemes, as well as transition issues relating to greenhouse gas emissions trading markets.

  7. Western Gas Sands Project. Status report, 1 March 1979--31 March 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    Progress of the government-sponsored projects directed toward increasing gas production from low-permeability gas sands of the western United States is summarized. During March, National Laboratories and Energy Technology Centers generally progressed on schedule. Bartlesville Energy Technology Center continued work on fracture conductivity, rock-fluid interaction, and log evaluation techniques. Theoretical and experimental work on hydraulic fracturing mechanics and analysis of well test data continued at Lawrence Livermore Laboratory. Sandia Laboratories completed preparations for the NTS evaluation test of the borehole seismic system. M.D. Wood, Inc. monitored the formation of a hydraulic fracture in the Wattenburg gas field, Weld County, Colorado. Measurement of bottom-hole pressure in the Miller No. 1 and Sprague No. 1 wells for the CIG cyclic gas injection project continued. The Mitchell Energy Corporation Muse--Duke No. 1 was flowing 4,000 MCFD in March. Efforts to clean out Mobil's PCU F31-13G well continued.

  8. CARMA Large Area Star Formation Survey: Project Overview with Analysis of Dense Gas Structure and Kinematics in Barnard 1

    Science.gov (United States)

    Storm, Shaye; Mundy, Lee G.; Fernández-López, Manuel; Lee, Katherine I.; Looney, Leslie W.; Teuben, Peter; Rosolowsky, Erik; Arce, Héctor G.; Ostriker, Eve C.; Segura-Cox, Dominique M.; Pound, Marc W.; Salter, Demerese M.; Volgenau, Nikolaus H.; Shirley, Yancy L.; Chen, Che-Yu; Gong, Hao; Plunkett, Adele L.; Tobin, John J.; Kwon, Woojin; Isella, Andrea; Kauffmann, Jens; Tassis, Konstantinos; Crutcher, Richard M.; Gammie, Charles F.; Testi, Leonardo

    2014-10-01

    We present details of the CARMA Large Area Star Formation Survey (CLASSy), while focusing on observations of Barnard 1. CLASSy is a CARMA Key Project that spectrally imaged N2H+, HCO+, and HCN (J = 1 → 0 transitions) across over 800 square arcminutes of the Perseus and Serpens Molecular Clouds. The observations have angular resolution near 7'' and spectral resolution near 0.16 km s-1. We imaged ~150 square arcminutes of Barnard 1, focusing on the main core, and the B1 Ridge and clumps to its southwest. N2H+ shows the strongest emission, with morphology similar to cool dust in the region, while HCO+ and HCN trace several molecular outflows from a collection of protostars in the main core. We identify a range of kinematic complexity, with N2H+ velocity dispersions ranging from ~0.05 to 0.50 km s-1 across the field. Simultaneous continuum mapping at 3 mm reveals six compact object detections, three of which are new detections. A new, non-binary dendrogram algorithm is used to analyze dense gas structures in the N2H+ position-position-velocity (PPV) cube. The projected sizes of dendrogram-identified structures range from about 0.01 to 0.34 pc. Size-linewidth relations using those structures show that non-thermal line-of-sight velocity dispersion varies weakly with projected size, while rms variation in the centroid velocity rises steeply with projected size. Comparing these relations, we propose that all dense gas structures in Barnard 1 have comparable depths into the sky, around 0.1-0.2 pc this suggests that overdense, parsec-scale regions within molecular clouds are better described as flattened structures rather than spherical collections of gas. Science-ready PPV cubes for Barnard 1 molecular emission are available for download.

  9. Natural gas projects in the developing world: An empirical evaluation of merits, obstacles, and risks

    Science.gov (United States)

    Mor, Amit

    Significant amounts of natural gas have been discovered in developing countries throughout the years during the course of oil exploration. The vast majority of these resources have not been utilized. Some developing countries may benefit from a carefully planned utilization of their indigenous resources, which can either be exported or used domestically to substitute imported or exportable fuels or feedstock. Governments, potential private sector investors, and financiers have been searching for strategies to promote natural gas schemes, some of which have been in the pipeline for more than two decades. The purpose of this thesis is to identify the crucial factors determining the success or failure of launching natural gas projects in the developing world. The methodology used to evaluate these questions included: (1) establishing a representative sample of natural gas projects in developing countries that were either implemented or failed to materialize during the 1980-1995 period, (2) utilizing a Probit limited dependent variable econometric model in which the explained variable is project success or failure, and (3) choosing representing indicators to reflect the assumed factors affecting project success. The study identified two conditions for project success: (1) the economic viability of the project and (2) securing financing for the investment. The factors that explain the ability or inability of the sponsors to secure financing were: (1) the volume of investment that represented the large capital costs of gas transportation, distribution, and storage, (2) the level of foreign exchange constraint in the host country, and (3) the level of development of the country. The conditions for private sector participation in natural gas projects in developing countries were identified in the study by a Probit model in which the explained variable was private sector participation. The results showed that a critical condition for private sector participation is the

  10. Russia's projects and investments in Central Asia: the oil and gas industry

    OpenAIRE

    Paramonov, Vladimir; Strokov, Aleksei

    2008-01-01

    In the 1990s, Russia's projects and investments in the Central Asian oil and gas industry were mainly concentrated in Kazakhstan, while its interest in other states of the region were minimal. When Vladimir Putin became Russian president in 2000 and the price of hydrocarbons steadily rose, Central Asia's importance abruptly increased. This caused the Russian Federation and Russian oil and gas companies to drastically step up their activity not only in Kazakhstan, but also in Turkmenistan and ...

  11. Producing hydrogen from coke-oven gas: the Solmer project. [PSA process

    Energy Technology Data Exchange (ETDEWEB)

    Bernard, G; Vidal, J

    1984-05-01

    After presenting the energy situation at the Solmer plant, where coke-oven gas is produced to excess, the authors examine the technical and economic possibilities of utilizing this gas for hydrogen extraction. They describe a project (based on the PSA process) for producing some 65 t/d of hydrogen and present the technical features of the scheme. An evaluation of the energy and financial costs of producing the hydrogen confirms the competitive status of the process.

  12. Cultural-resource survey report: Hoover Dam Powerplant Modification Project II. Associated transmission-line facility

    International Nuclear Information System (INIS)

    Queen, R.L.

    1991-06-01

    The Bureau of Reclamation (Reclamation) is proposing to modify or install additional transmission facilities between the Hoover Dam hydroelectric plant and the Western Area Power Authority substation near Boulder City, Nevada. Reclamation has completed cultural resource investigations to identify historic or prehistoric resources in the project area that might be affected during construction of the transmission line. Four possible transmission corridors approximately 50 feet wide and between 9.5 and 11.5 miles long were investigated. The proposed transmission lines either parallel or replace existing transmission lines. The corridors generally have undergone significant disturbance from past transmission line construction. A Class II sampling survey covering approximately 242 acres was conducted. Access or construction roads have not been identified and surveys of these areas will have to be completed in the future. No historic or prehistoric archeological sites were encountered within the four corridor right-of-ways. It is believed that the probability for prehistoric sites is very low. Four historic period sites were recorded that are outside, but near, the proposed corridor. These sites are not individually eligible for the National Register of Historic Places, but may be associated with the construction of Hoover Dam and contribute to a historic district or multiple property resource area focusing on the dam and its construction

  13. Assessment of corrosion in the flue gas cleaning system using on-line monitoring

    DEFF Research Database (Denmark)

    Montgomery, Melanie; Vendelbo Nielsen, Lars; Berggreen Petersen, Michael

    2015-01-01

    Amager unit 1 is a 350 MW multifuel suspension-fired plant commissioned in 2009 to fire biomass (straw and wood pellets). Increasing corrosion problems in the flue gas cleaning system were observed in the gas-gas preheater (GAFO), the booster fan and flue gas ducts. Chlorine containing corrosion ...

  14. On-line mass spectrometry measurement of fission gas release from nuclear fuel submitted to thermal transients

    International Nuclear Information System (INIS)

    Guigues, E.; Janulyte, A.; Zerega, Y.; Pontillon, Y.

    2013-06-01

    The work presented in this paper has been performed in the framework of a joint research program between Aix-Marseille University and CEA Cadarache. The aim is to develop a mass spectrometer (MS) device for the MERARG facility. MERARG is devoted to the study of fission gas release measurement, from nuclear fuels submitted to annealing tests in high activity laboratory such as LECA-STAR, thanks to gamma spectrometry. The mass spectrometer will then extend the measurement capability from the γ-emitters gases to all the gases involved in the release in order to have a better understanding of the fission gas release dynamics from fuel during thermal transients. Furthermore, the mass spectrometer instrument combines the capabilities and performances of both on-line (for release kinetic) and off-line implementations (for delayed accurate analysis of capacities containing total release gas). The paper deals with two main axes: (1) the modelling of gas sampling inlet device and its performance and (2) the first MS qualification/calibration results. The inlet device samples the gas and also adapts the pressure between MERARG sweeping line at 1.2 bar and mass spectrometer chamber at high vacuum. It is a two-stage device comprising a capillary at inlet, an intermediate vacuum chamber, a molecular leak inlet and a two-stage pumping device. Pressure drops, conductance and throughputs are estimated both for mass spectrometer operation and for exhaust gas recovery. Possible gas segregation is also estimated and device modification is proposed to attain a more accurate calibration. First experimental results obtained from a standard gas bottle show that the quantitative analysis at a few ppm level can be achieved for all isotopes of Kr and Xe, as well as masses 2 and 4 u. (authors)

  15. Waste management of Line Item projects at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Zill, D.S.

    1993-01-01

    With the growing number of companies involved with today's Line Item projects at the Oak Ridge National Laboratory (ORNL), there are ever increasing problems in the handling of Radioactive Solid Low-Level Waste (SLLW). The most important of these problems is who is going to do what with the waste and when are they going to do it. The who brings to mind training; the what, compliance; and the when, cost. At ORNL, the authors have found that the best way to address the challenges of waste handling where several contractors are involved is through communication, compromise and consistency. Without these elements, opportunities bred from waste handling are likely to bring the project to a halt

  16. On-line component ratio measurement of oil/gas/water mixtures using an admittance sensor

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, J A

    1984-01-01

    The operator of a production platform is primarily interested in which types of fluids a well is producing and how quickly these different components are being produced. The component ratio and production rate of a well vary during the life of a field. To optimize production, measurement of each well's output is thus desirable. Current designs for subsea production systems lack means of continuously measuring three-component flows. A new method of component ratio measurement is described. The fraction of oil, gas and water flowing between two insulated electrode plates is determined by measuring both the electrical conductance and suseptance across the sensor. A preliminary evaluation of the new measurement system has been performed using a process oil/ water/air mixture. The method is not limited to small pipe diameters. The only possible limitation is that for low velocities in very large pipe diameters an in-line mixer may be required. Advantages of this new system are that real-time measurement of void fraction and water content is possible if a non-intrusive rugged sensor is used, and there are no range limitations, as each component may be measured for any given concentration. 4 references.

  17. Investigation of gas discharge ion sources for on-line mass separation

    International Nuclear Information System (INIS)

    Kirchner, R.

    1976-03-01

    The development of efficient gas discharge ion sources with axial beam extraction for on-line mass separation is described. The aim of the investigation was to increase the ion source temperature, the lifetime and the ionisation yield in comparison to present low-pressure are discharge ion sources and to reduce the ion current density from usually 1 to 100 mA/cm 3 . In all ion sources the pressure range below the minimal ignition pressure of the arc discharge was investigated. As a result an ion source was developed which works at small changes in geometry and in electric device of a Nielsen source with high ionization yield (up to 50% for xenon) stabil and without ignition difficulties up to 10 -5 Torr. At a typical pressure of 3 x 10 -5 Torr ion current and ion current density are about 1 μA and 0.1 mA/cm 3 respectively besides high yield and a great emission aperture (diameter 1.2 mm). (orig.) [de

  18. Gulf of Mexico Outer Continental Shelf daily oil and gas production rate projections from 1999 through 2003

    International Nuclear Information System (INIS)

    Melancon, J.M.; Baud, R.D.

    1999-02-01

    This paper provides daily oil and gas production rate projections for the Gulf of Mexico (GOM) Outer Continental Shelf (OCS) for the years 1999 through 2003. These projections represent daily oil and gas production estimates at calendar year end. In this report, daily oil production rates include both oil and condensate production, and daily gas production rates include both associated and nonassociated gas production. In addition to providing daily oil and gas production rate projections, the authors have included one figure and one table pertaining to leasing history and one table concerning exploration and development plan approvals

  19. Gulf of Mexico outer continental shelf daily oil and gas production rare projections from 1998 through 2002

    International Nuclear Information System (INIS)

    Melancon, J.M.; Roby, D.S.

    1998-02-01

    This paper provides daily oil and gas production rate projections for the Gulf of Mexico (GOM) Outer Continental Shelf (OCS) for the years 1998 through 2002. These projections represent daily oil and gas production estimates at calendar year end. In this report, daily oil production rates include both oil and condensate production, and daily gas production rates include both associated and nonassociated gas production. In addition to providing daily oil and gas production rate projections, the authors have included one figure and one table pertaining to leasing history and one table concerning exploration and development plan approvals

  20. On-line monitoring of methanol and methyl formate in the exhaust gas of an industrial formaldehyde production plant by a mid-IR gas sensor based on tunable Fabry-Pérot filter technology.

    Science.gov (United States)

    Genner, Andreas; Gasser, Christoph; Moser, Harald; Ofner, Johannes; Schreiber, Josef; Lendl, Bernhard

    2017-01-01

    On-line monitoring of key chemicals in an industrial production plant ensures economic operation, guarantees the desired product quality, and provides additional in-depth information on the involved chemical processes. For that purpose, rapid, rugged, and flexible measurement systems at reasonable cost are required. Here, we present the application of a flexible mid-IR filtometer for industrial gas sensing. The developed prototype consists of a modulated thermal infrared source, a temperature-controlled gas cell for absorption measurement and an integrated device consisting of a Fabry-Pérot interferometer and a pyroelectric mid-IR detector. The prototype was calibrated in the research laboratory at TU Wien for measuring methanol and methyl formate in the concentration ranges from 660 to 4390 and 747 to 4610 ppmV. Subsequently, the prototype was transferred and installed at the project partner Metadynea Austria GmbH and linked to their Process Control System via a dedicated micro-controller and used for on-line monitoring of the process off-gas. Up to five process streams were sequentially monitored in a fully automated manner. The obtained readings for methanol and methyl formate concentrations provided useful information on the efficiency and correct functioning of the process plant. Of special interest for industry is the now added capability to monitor the start-up phase and process irregularities with high time resolution (5 s).

  1. Conflict Approaches of Effective Project Manager in the Upstream Sector of Indonesian Oil & Gas Industry

    Directory of Open Access Journals (Sweden)

    Adhi Cahyono

    2012-10-01

    Full Text Available Conflict can be functional or dysfunctional to the organization’s performance. This study focused on the relationship between conflict approaches implemented by the project manager based on project team member’s perception on the effectiveness of the project manager in managing project’s conflict. Questionnaires were modified from Barker et al. (1988 to measure conflict management approaches and outcomes of managing project conflict. Data were gathered from 57 respondents who worked in the Engineering, Procurement, and Construction (EPC contractors serving the upstream sector of the Oil and Gas industry in Indonesia. By using Pearson correlation, result of this study indicated that project managers were perceived to be effective in managing project conflict when implementing cooperative and confi rmative approaches, but ineffective when combining competitive and avoidance approaches. Further research should investigate correlation between cultural dimensions with conflict approaches and outcomes of managing conflict.

  2. Discussion after implementation of possible ergonomics contributions in production lines automation project

    Directory of Open Access Journals (Sweden)

    José Adriano Canton

    2016-11-01

    Full Text Available This paper addresses the issue of work spaces designed based on Activity-Centered Ergonomics. The aim was to reflect on the role of Ergonomics in the design of productive situations in order to anticipate and mitigate the emergence of new constraints. This study was developed using a case study from the packaging industry, where an automated line was implemented to mitigate the injuries suffered as result of the manual system. This article was based on the results of an Ergonomic Work Analysis of the solution implemented, and the subsequent analysis of this design process. It was found that the adopted solution does not have enough leeway for dealing with variations inherent to the process, requiring constant interventions in the operation, by the operators in order to free the line to continue work. It was evident that the adopted solution did not involve the participation of important agents such as the operators and the maintenance crew, giving the project a technical vision that was concerned with eliminating the human factor. The conclusion of this study was that the Ergonomics integrated into the project development favors the collective construction of analysis of the research, and consequently, the development of more effective solutions.

  3. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  4. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  5. Literature Review: Theory and Application of In-Line Inspection Technologies for Oil and Gas Pipeline Girth Weld Defection

    Science.gov (United States)

    Feng, Qingshan; Li, Rui; Nie, Baohua; Liu, Shucong; Zhao, Lianyu; Zhang, Hong

    2016-01-01

    Girth weld cracking is one of the main failure modes in oil and gas pipelines; girth weld cracking inspection has great economic and social significance for the intrinsic safety of pipelines. This paper introduces the typical girth weld defects of oil and gas pipelines and the common nondestructive testing methods, and systematically generalizes the progress in the studies on technical principles, signal analysis, defect sizing method and inspection reliability, etc., of magnetic flux leakage (MFL) inspection, liquid ultrasonic inspection, electromagnetic acoustic transducer (EMAT) inspection and remote field eddy current (RFDC) inspection for oil and gas pipeline girth weld defects. Additionally, it introduces the new technologies for composite ultrasonic, laser ultrasonic, and magnetostriction inspection, and provides reference for development and application of oil and gas pipeline girth weld defect in-line inspection technology. PMID:28036016

  6. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix K (continued)

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices K (continued) of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  7. Environmental Impact Assessment Process for Oil, Gas and Mining Projects in Nigeria: A Critical Analysis

    Directory of Open Access Journals (Sweden)

    Allan Ingelson and Chilenye Nwapi

    2014-06-01

    Full Text Available Oil and gas development projects are well known to have damaging environmental effects, and that is especially true in the Niger Delta region. Since the enactment of the Environmental Impact Assessment Act in Nigeria in 1992, there has been a general perception that EIAs are seldom carried out in the region. This article presents a critical analysis of legislation and practice concerning the environmental impact assessment (EIA process for oil and gas projects in Nigeria, the world’s twelfth largest producer of crude oil. It discusses a range of reasons why the impacts of oil and gas projects are not being managed well, despite the legal requirements for EIAs. A review of Nigeria’s environmental governance is presented along with a comprehensive discussion of the EIA process and its significant deficiencies. We argue that the EIA system for oil and gas projects in Nigeria reflects tokenism, resulting in the concentration of benefits of developments in big corporations and government officials. The EIA process in Nigeria faces many challenges that must be addressed in order to improve its effectiveness and alleviate the environmental burdens on this rich oil-producing region.

  8. Uncertainty in greenhouse-gas emission scenario projections: Experiences from Mexico and South Africa

    DEFF Research Database (Denmark)

    Puig, Daniel

    This report outlines approaches to quantify the uncertainty associated with national greenhouse-gas emission scenario projections. It does so by describing practical applications of those approaches in two countries – Mexico and South Africa. The goal of the report is to promote uncertainty...

  9. Economic and Strategic Expectations from Trans Anatolian Natural Gas Pipeline Project

    Directory of Open Access Journals (Sweden)

    Elchin Suleymanov

    2016-12-01

    Full Text Available Following the successful implementation of the oil strategy, Azerbaijan began to define strategic objectives in relation to gas export policy. Currently, Azerbaijan is the only country in the region exporting gas to the international markets (Turkey, Russia, Georgia. For this reason, it is seen as “the provider and participant” of Southern Gas Corridor by EU. In this direction, Azerbaijan aims to be the country of an important and strategic natural gas exporter. From Shahdeniz field to the end European user, it targets to take part in the every ring of the value chain. These assumptions bring Azerbaijan to the position of a remarkable natural gas supplier for the export of large amount of gas to the European markets through Nabucco West. The implementation of the project with financial and technical capabilities of Azerbaijan and Turkey has made it a project to be realized between Turkey-Azerbaijan. TANAP means Turkey and Azerbaijan will emerge together in the European market for energy transportation. Along with Baku-Tbilisi-Ceyhan and Baku-Tbilisi-Erzurum, TANAP has reinforced Turkey’s position as a necessary energy corridor in delivering the energy resources of the Caspian Sea to the Western markets. In this paper, expected strategic and economic outcomes of TANAP are analyzed.

  10. Simulating security of supply effects of the Nabucco and South Stream projects for the European natural gas market

    Energy Technology Data Exchange (ETDEWEB)

    Dieckhoener, Caroline

    2010-12-15

    Due to the increasing European import dependency, significant additional natural gas volumes will be required. In addition to the Nord Stream pipeline, the Nabucco and South Stream pipeline are projects planned for the next decade to provide further gas supplies to the European market. As one of the European Union's energy policies' foci is security of supply, the question can be raised if and how these projects contribute to this objective not only in terms of diversification but also in case of supply disruptions such as occurred in 2009 during the Russia-Ukraine gas crisis. This paper discusses the impact of these two major gas import pipeline projects on the South-Eastern Europe gas supply and analyzes their effects on gas flows and marginal cost prices in general and in case of gas supply disruptions via Ukraine in a model-based analysis with the European natural gas infrastructure and dispatch model TIGER. (orig.)

  11. Case history of a successful CO{sub 2} miscible gas WAG injection project

    Energy Technology Data Exchange (ETDEWEB)

    Harpole, Ken

    1998-07-01

    A successful fieldwide CO{sub 2} miscible gas injection project has been underway at the East Vacuum Grayburg San Andres Unit (EVGSAU) in eastern New Mexico, USA since 1985. This presentation follows the evolution of CO{sub 2} miscible gas WAG injection operations at EVGSAU and discusses some of the significant changes in reservoir strategy management which have been implemented over the past 13 years. These changes parallel the evolution in the industry's understanding of and experience with CO{sub 2} miscible gs injection processes. The operating problems and reservoir management challenges encountered at East Vacuum - injection performance, sweep efficiency, effective management of WAG operations, rapidly changing requirements for handling produced gas, and maintaining efficient utilization of injected CO{sub 2} - reflect the kinds of challenges typically encountered in managing a large CO{sub 2} injection project. 1 fig., 1 tab.

  12. Oil and gas investment projects in the frame of the Kyoto protocol flexibility mechanisms in Russia

    International Nuclear Information System (INIS)

    Platonova, A.

    2005-02-01

    This PhD thesis evaluates the perspectives of the oil and gas investment projects in the frame of the Joint Implementation mechanism in Russia. From the energy point of view, the relationships between climate policy and energy systems are described and the main sources of GHG emissions reductions in the Russian oil and gas sector are evaluated. From the environmental point of view, the JI is firstly considered as an economic instrument of the international climate agreements. Secondly, are demonstrated the characteristics of the JI perturbing his efficiency and his capacity to ensure the environmental quality of projects. Based on the specificities of Russian climate policy, two scenarios of its development are proposed to estimate the perspectives of JI in the oil and gas sector in the middle term. (author)

  13. Quality Assurance Project Plan for the Gas Generation Testing Program at the INEL

    International Nuclear Information System (INIS)

    1994-10-01

    The data quality objectives (DQOs) for the Program are to evaluate compliance with the limits on total gas generation rates, establish the concentrations of hydrogen and methane in the total gas flow, determine the headspace concentration of VOCs in each drum prior to the start of the test, and obtain estimates of the concentrations of several compounds for mass balance purposes. Criteria for the selection of waste containers at the INEL and the parameters that must be characterized prior to and during the tests are described. Collection of gaseous samples from 55-gallon drums of contact-handled transuranic waste for the gas generation testing is discussed. Analytical methods and calibrations are summarized. Administrative quality control measures described in this QAPjP include the generation, review, and approval of project documentation; control and retention of records; measures to ensure that personnel, subcontractors or vendors, and equipment meet the specifications necessary to achieve the required data quality for the project

  14. A program to develop the domestic natural gas industry in Indonesia: Case history of two World Bank projects

    International Nuclear Information System (INIS)

    Klass, D.L.; Khwaja, S.

    1992-01-01

    Indonesia depends heavily on revenues from the export of LNG and oil, the availability of which appears to be decreasing. It is therefore making a strong effort to accelerate development of a domestic natural gas industry. A high priority has been given to the conversion of power plants and city gas systems, including local industries and commercial facilities, from liquid fuels to natural gas. This will release more oil for export, help to meet the objectives of Repelita V, and provide substantial environmental benefits. The World Bank recently provided loans to the Indonesian Government for two projects that are aimed at substituting natural gas for oil and manufactured gas in domestic markets. One project involves expansion of the gas distribution systems of Indonesia's natural gas utility (PGN) in three cities: Jakarta and Bogor in Java, and Medan in Sumatra. Approximately 350 new industrial, 800 new commercial, and 12,700 new residential natural gas customers are expected from this project. Incremental gas sales are projected to be about 48.1 million CF/d when the project is completed in 1992. The project also includes training programs for PGN staff and an energy pricing policy study to be carried out by Indonesia's Ministry of Mines and Energy. The second project involves expansion of the supply of natural gas for Surabaya and twelve other towns in its vicinity in East Java, and further expansion of Medan's supply system. The gas for Surabaya will be used for about 400 industrial and 150 commercial customers, and 3,600 households. The additional gas supply for Medan will be used for two power plants operated by the state electric utility, PLN. Incremental natural gas sales from this project are projected to be 68 million CF/d when it is

  15. Architecture and Functionality of the Advanced Life Support On-Line Project Information System

    Science.gov (United States)

    Hogan, John A.; Levri, Julie A.; Morrow, Rich; Cavazzoni, Jim; Rodriguez, Luis F.; Riano, Rebecca; Whitaker, Dawn R.

    2004-01-01

    An ongoing effort is underway at NASA Ames Research Center (ARC) to develop an On-line Project Information System (OPIS) for the Advanced Life Support (ALS) Program. The objective of this three-year project is to develop, test, revise and deploy OPIS to enhance the quality of decision-making metrics and attainment of Program goals through improved knowledge sharing. OPIS will centrally locate detailed project information solicited from investigators on an annual basis and make it readily accessible by the ALS Community via a Web-accessible interface. The data will be stored in an object-oriented relational database (created in MySQL) located on a secure server at NASA ARC. OPE will simultaneously serve several functions, including being an research and technology development (R&TD) status information hub that can potentially serve as the primary annual reporting mechanism for ALS-funded projects. Using OPIS, ALS managers and element leads will be able to carry out informed R&TD investment decisions, and allow analysts to perform accurate systems evaluations. Additionally, the range and specificity of information solicited will serve to educate technology developers of programmatic needs. OPIS will collect comprehensive information from all ALS projects as well as highly detailed information specific to technology development in each ALS area (Waste, Water, Air, Biomass, Food, Thermal, Controls and Systems Analysis). Because the scope of needed information can vary dramatically between areas, element-specific technology information is being compiled with the aid of multiple specialized working groups. This paper presents the current development status in terms of the architecture and functionality of OPIS. Possible implementation approaches for OPIS are also discussed.

  16. Summary of the technical guidelines used in the project: The economics of greenhouse gas limitations

    International Nuclear Information System (INIS)

    Halsnaes, Kirsten

    1998-01-01

    This document is a summary version of the technical guidelines for climate change mitigation assessment developed as a part of the Global Environment Facility (GEF) project The Economics of Greenhouse Gas Limitations; Technical guidelines (UNEP 1998). The objectives of this project have been to support the development of a methodology, an implementing framework and a reporting system which countries can use in the construction of national climate change policies and in meeting their future reporting obligations under the FCCC. The methodological framework developed in the guidelines covers key economic concepts, scenario building, modelling tools and common assumptions. It was used by several country studies included in the project. (au)

  17. Modelling gas migration in fractured rock. A contribution to the EU's PROGRESS project

    International Nuclear Information System (INIS)

    Humm, J.; Robinson, P.; Clark, K.

    2001-01-01

    To assess the performance of a waste repository, it is necessary to be able to predict the rates of gas generation and to understand and evaluate both the way the gas may disperse from the repository and any effects that might be associated with this dispersal. This document describes the modelling work carried out by QuantiSci on behalf of the UK Environment Agency, in conjunction with the CEC PROGRESS Project (Research into Gas Generation and Migration in Radioactive Waste Repository Systems) which has been carried out as part of the European Commission's IV th framework R and D programme. The project was under the PEGASUS (Projects on the Effects of GAS in Underground Storage facilities) umbrella. A review is provided of alternative conceptual models for the migration of gas through an initially water saturated fracture. A range of front or interface tracking methods for computing gas migration through a fracture is described: direct discretisation, marker particle, volume of fluids and level set methods. Volume of fluids methods are identified as the most appropriate approach for models of this sort. Subsequently, a description is given of the development of a model of gas injection into a single fracture in a portion of Borrowdale Volcanic Granite. The theoretical approach for the model is described in detail and the model compared to experimental results obtained for the real fracture. The experimental results of the CEC PROGRESS Project (obtained using Positron Emission Tomography) do not show particularly good agreement with the model results. However, there are strong indications that this is largely the result of uncertainties in the interpretation of the PET results. The experimental results are acknowledged to be extremely hard to interpret and the apparent negative gas thicknesses observed experimentally confirm this fact. Given the clearly critical dependence of the gas migration pathways on the aperture distribution, any discrepancies of this sort

  18. Pipeline politics—A study of India′s proposed cross border gas projects

    International Nuclear Information System (INIS)

    Nathan, Hippu Salk Kristle; Kulkarni, Sanket Sudhir; Ahuja, Dilip R.

    2013-01-01

    India′s energy situation is characterized by increasing energy demand, high fossil fuel dependency, large import shares, and significant portion of population deprived of modern energy services. At this juncture, natural gas, being the cleanest fossil fuel with high efficiency and cost effectiveness, is expected to play an important role. India, with only 0.6% of proven world reserves, is not endowed with adequate natural gas domestically. Nevertheless, there are gas reserves in neighbouring regions which gives rise to the prospects of three cross border gas pipeline projects, namely, Iran–Pakistan–India, Turkmenistan–Afghanistan–Pakistan–India, and Myanmar–Bangladesh–India. This study is a political analysis of these pipeline projects. First, it provides justification on use of natural gas and promotion of cross border energy trade. Then it examines these three pipeline projects and analyses the security concerns, role of different actors, their positions, shifting goals, and strategies. The study develops scenarios on the basis of changing circumstances and discusses some of the pertinent issues like technology options for underground/underwater pipelines and role of private players. It also explores impact of India′s broader foreign relations and role of SAARC on the future of pipelines and proposes energy induced mutually assured protection (MAP) as a concept for regional security. -- Highlights: •We justify the need for cross border energy trade through gas pipelines for India. •We examine prospective pipeline projects—IPI, TAPI, MBI and their security issues. •We develop scenarios and analyze role of actors, their positions, and strategies. •We discuss technology and policy options for realizing these gas pipelines. •We propose energy induced mutually assured protection (MAP) for regional security

  19. Development Approach of the Advanced Life Support On-line Project Information System

    Science.gov (United States)

    Levri, Julie A.; Hogan, John A.; Morrow, Rich; Ho, Michael C.; Kaehms, Bob; Cavazzoni, Jim; Brodbeck, Christina A.; Whitaker, Dawn R.

    2005-01-01

    The Advanced Life Support (ALS) Program has recently accelerated an effort to develop an On-line Project Information System (OPIS) for research project and technology development data centralization and sharing. There has been significant advancement in the On-line Project Information System (OPIS) over the past year (Hogan et al, 2004). This paper presents the resultant OPIS development approach. OPIS is being built as an application framework consisting of an uderlying Linux/Apache/MySQL/PHP (LAMP) stack, and supporting class libraries that provides database abstraction and automatic code generation, simplifying the ongoing development and maintenance process. Such a development approach allows for quick adaptation to serve multiple Programs, although initial deployment is for an ALS module. OPIS core functionality will involve a Web-based annual solicitation of project and technology data directly from ALS Principal Investigators (PIs) through customized data collection forms. Data provided by PIs will be reviewed by a Technical Task Monitor (TTM) before posting the information to OPIS for ALS Community viewing via the Web. Such Annual Reports will be permanent, citable references within OPIS. OPlS core functionality will also include Project Home Sites, which will allow PIS to provide updated technology information to the Community in between Annual Report updates. All data will be stored in an object-oriented relational database, created in MySQL(Reistered Trademark) and located on a secure server at NASA Ames Research Center (ARC). Upon launch, OPlS can be utilized by Managers to identify research and technology development (R&TD) gaps and to assess task performance. Analysts can employ OPlS to obtain the current, comprehensive, accurate information about advanced technologies that is required to perform trade studies of various life support system options. ALS researchers and technology developers can use OPlS to achieve an improved understanding of the NASA

  20. Western Gas Sands Project. Status report, 1 September 1979-30 September 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    This report summarizes progress of the government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States. Bartlesville Energy Technology Center continued work on rock-fluid interaction and advanced logging techniques. Lawrence Livermore Laboratory continued experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data. Los Alamos Scientific Laboratory continued work on permeability and porosity determination of core samples and geological support studies. Sandia Laboratories continued work on their EGR Instrumentation and Diagnostic Program. Cyclic gas injection continued at Colorado Interstate Gas Company's Miller No. 1 and Sprague No. 1 wells. The DOE Well Test Facility is continuing to provide technical support to the Gas Research Institute/Rio Blanco Natural Gas MHF experiment. The Gas Producing Enterprises, Inc. Natural Buttes Unit wells continued to flow to sales. The Mitchell Energy Corporation Muse-Duke No. 1 was opened after a 28-day shut-in period. The hydraulic fracturing containment experiment continued for the Sandia-mineback program.

  1. Western Gas Sands Project. Status report, 1 August-31 August, 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    This status report summarizes progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States. Work on fracture conductivity, rock-fluid interaction, and log evaluation and interpretation techniques continued at Bartlesville. Work commenced on completing, testing and possible hydraulic fracturing of the Rio Blanco Natural Gas Company well No. 397-19-1 and on the evaluation of seismic data for stratigraphic studies of lenticular sands. LLL continued experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data. LASL worked on developing NMR methods to define fluid saturation, porosity, and permeability of western gas sands at in situ conditions. M.D. Wood, Inc. was involved in design and site preparation for two hydraulic fracture mapping jobs in the Cotton Valley Trend in Texas. Testing and analyses of the borehole seismic system and borehole hydrophone system continued at Sandia. Field tests and related activities for the WGSP progressed as scheduled in August. Cyclic injection of dehydrated natural gas and production in Colorado Interstate Gas Company's Miller No. 1 and Sprague No. 1 wells continued. The Gas Producing Enterprises, Inc. wells, Natural Buttes Units 9, 14, 18 and 20 flowed to sales. The Mitchell Energy Corporation Muse-Duke No. 1 was shut-in for a 15-day pressure buildup test. Hydraulic fracture containment experiments and activities in the multi-frac test series continued at the Nevada Test Site for Sandia Laboratories' mineback program.

  2. Multicomponent gas flow computations by a discontinuous Galerkin scheme using L2-projection of perfect gas EOS

    Science.gov (United States)

    Franchina, N.; Savini, M.; Bassi, F.

    2016-06-01

    A new formulation of multicomponent gas flow computation, suited to a discontinuous Galerkin discretization, is here presented and discussed. The original key feature is the use of L2-projection form of the (perfect gas) equation of state that allows all thermodynamic variables to span the same functional space. This choice greatly mitigates problems encountered by the front-capturing schemes in computing discontinuous flow field, retaining at the same time their conservation properties at the discrete level and ease of use. This new approach, combined with an original residual-based artificial dissipation technique, shows itself capable, through a series of tests illustrated in the paper, to both control the spurious oscillations of flow variables occurring in high-order accurate computations and reduce them increasing the degree of the polynomial representation of the solution. This result is of great importance in computing reacting gaseous flows, where the local accuracy of temperature and species mass fractions is crucial to the correct evaluation of the chemical source terms contained in the equations, even if the presence of the physical diffusivities somewhat brings relief to these problems. The present work can therefore also be considered, among many others already presented in the literature, as the authors' first step toward the construction of a new discontinuous Galerkin scheme for reacting gas mixture flows.

  3. Architecture and Functionality of the Advanced Life Support On-Line Project Information System (OPIS)

    Science.gov (United States)

    Hogan, John A.; Levri, Julie A.; Morrow, Rich; Cavazzoni, Jim; Rodriquez, Luis F.; Riano, Rebecca; Whitaker, Dawn R.

    2004-01-01

    An ongoing effort is underway at NASA Amcs Research Center (ARC) tu develop an On-line Project Information System (OPIS) for the Advanced Life Support (ALS) Program. The objective of this three-year project is to develop, test, revise and deploy OPIS to enhance the quality of decision-making metrics and attainment of Program goals through improved knowledge sharing. OPIS will centrally locate detailed project information solicited from investigators on an annual basis and make it readily accessible by the ALS Community via a web-accessible interface. The data will be stored in an object-oriented relational database (created in MySQL(Trademark) located on a secure server at NASA ARC. OPE will simultaneously serve several functions, including being an R&TD status information hub that can potentially serve as the primary annual reporting mechanism. Using OPIS, ALS managers and element leads will be able to carry out informed research and technology development investment decisions, and allow analysts to perform accurate systems evaluations. Additionally, the range and specificity of information solicited will serve to educate technology developers of programmatic needs. OPIS will collect comprehensive information from all ALS projects as well as highly detailed information specific to technology development in each ALS area (Waste, Water, Air, Biomass, Food, Thermal, and Control). Because the scope of needed information can vary dramatically between areas, element-specific technology information is being compiled with the aid of multiple specialized working groups. This paper presents the current development status in terms of the architecture and functionality of OPIS. Possible implementation approaches for OPIS are also discussed.

  4. Circumnuclear Multi-phase Gas in the Circinus Galaxy. I. Non-LTE Calculations of CO Lines

    Science.gov (United States)

    Wada, Keiichi; Fukushige, Ryosuke; Izumi, Takuma; Tomisaka, Kohji

    2018-01-01

    In this study, we investigate the line emissions from cold molecular gas based on our previous “radiation-driven fountain model,” which reliably explains the spectral energy distribution of the nearest type 2 Seyfert galaxy, the Circinus galaxy. Using a snapshot of the best-fit radiation-hydrodynamic model for the central r≤slant 16 pc, in which non-equilibrium X-ray-dominated region chemistry is solved, we conduct post-processed non-local thermodynamic equilibrium radiation transfer simulations for the CO lines. We obtain a spectral line energy distribution with a peak around J≃ 6, and its distribution suggests that the lines are not thermalized. However, for a given line of sight, the optical depth distribution is highly non-uniform between {τ }ν \\ll 1 and {τ }ν \\gg 1. The CO-to-H2 conversion factor ({X}{CO}), which can be directly obtained from the results and is not a constant, depends strongly on the integrated intensity and differs from the fiducial value for local objects. {X}{CO} exhibits a large dispersion of more than one order of magnitude, reflecting the non-uniform internal structure of a “torus.” In addition, we found that the physical conditions differ between grid cells on a scale of a few parsecs along the observed lines of sight; therefore, a specific observed line ratio does not necessarily represent a single physical state of the interstellar medium.

  5. Long term Gas Supply Security in an Enlarged Europe. Final Report ENGAGED Project

    International Nuclear Information System (INIS)

    Van Oostvoorn, F.; Likachev, V.; Morgan, T.

    2004-12-01

    The title project concerned a study on the long-term gas supply security in Europe with a focus on the developments, risks and policies in the candidate countries in Eastern Europe. For that reason the report not only includes a European and EU-30 wide scenario analysis but also chapters on specific topics. One study (a chapter in this report) concerns the gas market and regulation developments in a number of relevant candidate countries. Another chapter presents a Russian vision on gas demand, production and supplies from Russia and also includes a paragraph on the supplies from other neighbours and the transit issues in the Ukraine. Finally, the report contains a chapter discussing the required network infrastructure for bringing the gas from external gas suppliers to the EU-30 markets. Hereby it analysis and tests the network flexibility to cope with some unlikely and unexpected supply interruptions in main pipelines to EU markets. The background information of the studies underlying the chapters can be partly found in the annexes and in the individual task reports. During the project the results of the study were discussed at several seminars in candidate countries and particularly on the final seminar in Prague, in June 2003, with different and important stakeholders and market actors

  6. Project of the JINR heavy ion synchrotron on-line control system

    International Nuclear Information System (INIS)

    Glejbman, Eh.M.; Zhabitskij, V.M.; Ivanov, I.N.

    1983-01-01

    Description of the project of the JINR heavy ion synchrotron (HIS) on-line control system (OCS) which is a strong-focusing synchrotron designed for avarage energies, is given. Complete average stream of data from HIS constitutes approximately 500 byte/s, when operation cycle is 0.33 s. The structure of HIS OCS is a two-hierarchy system with the distributed processing and control, built using modular principle. The first, lower hierarchy level forms eight subsystems, each of them is oriented for automation of concrete functionally-technological system of the accelerator. The higher hierarchy is the central complex computer which is a multimicroprocessor computer. The hardware of HIS OCS is envisaged to be realized on the base of CAMAC moduls. HIS OCS software will be disigned as the SM computer specialized real-time system supplemented with applied programs and language interpreter for the accelerator control

  7. Design and manufacture of the RF power supply and RF transmission line for SANAEM project Prometheus

    Science.gov (United States)

    Turemen, G.; Ogur, S.; Ahiska, F.; Yasatekin, B.; Cicek, E.; Ozbey, A.; Kilic, I.; Unel, G.; Alacakir, A.

    2017-08-01

    A 1-5 MeV proton beamline is being built by the Turkish Atomic Energy Authority in collaboration with a number of graduate students from different universities. The primary goal of the project, is to acquire the design ability and manufacturing capability of all the components locally. SPP will be an accelerator and beam diagnostics test facility and it will also serve the detector development community with its low beam current. This paper discusses the design and construction of the RF power supply and the RF transmission line components such as its waveguide converters and its circulator. Additionally low and high power RF test results are presented to compare the performances of the locally produced components to the commercially available ones.

  8. Ontario Hydro's environmental monitoring program for HV [high voltage] transmission line projects

    International Nuclear Information System (INIS)

    Braekevelt, P.N.

    1991-01-01

    Responsible monitoring and control of environmental impacts is key to obtaining future needed approvals for new high voltage (HV) transmission line projects. Ontario Hydro's environmental monitoring program was developed as a highly structured, self-imposed monitoring system to relieve government agencies of the responsibility of developing a similar external program. The goal was to be self-policing. The historical development, program structure, standards, priority ratings, documentation, communication and computerization of the program is described. The most effective way to minimize environmental impacts is to avoid sensitive features at the route selection stage, well before any construction takes place. The environmental monitoring program is based on the following blueprint: each crew member is responsible for environmental protection; environmental problems are to be resolved at the lowest level possible; potential concerns should be resolved before they become problems; known problems should be dealt with quickly to minimize impacts; team members should work cooperatively; and formal and regular communication is emphasized

  9. Fracture lines: will Canada's water be protected in the rush to develop shale gas?

    Energy Technology Data Exchange (ETDEWEB)

    Parfitt, Ben [Munk School of Global Affairs at the University of Toronto (Canada)

    2010-10-15

    By combining hydraulic fracking with horizontal drilling, the gas industry has been able to unlock significant amounts of natural gas trapped inside deep and densely packed shale rock. The exploitation of shale gas has been a remarkable revolution in the last decade, going from hardly any production in 2000 to 20% of the United States' gas production in 2010. This cheap and abundant resource has been referred to as a game changer by North American industries and governments. However concerns about water usage and groundwater contamination have been raised. Indeed, the shale gas industry is responsible for the contamination of about 1,000 water wells and has been criticized for its important water withdrawals. This report intends to present the effects of shale gas production on the water supplies in Canada. It reviews the state of groundwater mapping in shale rich regions and reviews regulatory frameworks to determine if they are sufficient to protect water resources.

  10. Projection systems with a cut-off line for automotive applications

    Science.gov (United States)

    Kloos, G.; Eichhorn, K.

    2005-08-01

    The lighting systems of a car provide a variety of challenges from the point of view of illumination science and technology. Engineering work in this field has to deal both with reflector and lens design as well as with opto-mechanical design and sensor technology. It has direct implications on traffic safety and the efficiency in which energy is used. Therefore, these systems are continuously improved and optimized. In this context, adaptive systems that we investigate for automotive applications gain increasing importance. The properties of the light distribution in the vicinity of the cut-off line are of key importance for the safe and efficient operation of automotive headlamps. An alternative approach is proposed to refine the description of these properties in an attempt to make it more quantitative. This description is intended to facilitate intercomparison between different systems and/or to study environmental influences on the cut-off line of a system under investigation. Designing projection systems it is necessary to take a delicate trade-off between efficiency, light-distribution characteristics, mechanical boundary conditions, and legal requirements into account. Considerations and results on optical properties of three-axial reflectors in dependence of layout parameters will be given. They can serve as a guideline for the optical workshop and for free-form optimization.

  11. Mixed metazoan and bacterial infection of the gas bladder of the lined seahorse-a case report.

    Science.gov (United States)

    Anderson, Paul A; Petty, Barbara D

    2013-03-01

    Five wild-caught Lined Seahorses Hippocampus erectus from an aquarium system presented with altered buoyancy and distended upper trunks. Radiography of one specimen revealed a reduced air volume in the gas bladder. Pneumocystocentesis revealed a brown exudate of numerous leukocytes, parasite ova, and Gram- and acid-fast-positive bacilli under wet mounts and stains. Necropsies revealed enlarged, friable kidneys and distended gas bladders containing copious purulent exudate, necrotic tissue, and adult digeneans Dictysarca virens. Bacterial isolates from exudate cultures grown on Lowenstein-Jensen medium were identified as Gordonia sp. and Mycobacterium poriferae by high-performance liquid chromatography and 16S ribosomal DNA sequencing. Histopathology demonstrated a histiocytic response in kidney and gas bladder exudate, inflammation of the gas bladder wall, and infection of the gas bladder lumen with parasite ova and acid-fast-positive and Gomori's methenamine silver-positive bacilli. Praziquantel is prescribed for digenean infections but dissolves incompletely in seawater and is toxic to this host. Eradication of intermediate host vectors is a management option. Treatment of Gordonia infection has not been addressed in nonhuman animals, and there is no known effective treatment for Mycobacterium spp. infection in fishes. This is the first case report of digenean infection of the gas bladder in a syngnathid, Gordonia sp. infection in a nonhuman animal, and M. poriferae infection in a fish.

  12. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  13. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    International Nuclear Information System (INIS)

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA)

  14. A new in-gas-laser ionization and spectroscopy laboratory for off-line studies at KU Leuven

    International Nuclear Information System (INIS)

    Kudryavtsev, Yu.; Creemers, P.; Ferrer, R.; Granados, C.; Gaffney, L.P.; Huyse, M.; Mogilevskiy, E.; Raeder, S.; Sels, S.; Van den Bergh, P.; Van Duppen, P.; Zadvornaya, A.

    2016-01-01

    The in-gas laser ionization and spectroscopy (IGLIS) technique is used to produce and to investigate short-lived radioactive isotopes at on-line ion beam facilities. In this technique, the nuclear reaction products recoiling out of a thin target are thermalized and neutralized in a high-pressure noble gas, resonantly ionized by the laser beams in a two-step process, and then extracted from the ion source to be finally accelerated and mass separated. Resonant ionization of radioactive species in the supersonic gas jet ensures very high spectral resolution because of essential reduction of broadening mechanisms. To obtain the maximum efficiency and the best spectral resolution, properties of the supersonic jet and the laser beams must be optimized. To perform these studies a new off-line IGLIS laboratory, including a new high-repetition-rate laser system and a dedicated off-line mass separator, has been commissioned. In this article, the specifications of the different components necessary to achieve optimum conditions in laser-spectroscopy studies of radioactive beams using IGLIS are discussed and the results of simulations are presented.

  15. Nodalization Preparation for the Transient Simulation of Cooling System for One Line Mode of RSG-GAS

    International Nuclear Information System (INIS)

    Sukmanto Dibyo; Susyadi; Tagor MS; Darwis Isnaeni

    2004-01-01

    Cooling system is important component in RSG-GAS. To carry out the transient simulation of one line-cooling mode, the model of RSG-GAS has been prepared. To illustrate the transient condition, the RELAP5.MOD3 computer code the existing input files were used. This Input consist of kinetic, thermal, hydraulic and geometries data. Modification and decrement of number of nodalization has been done to simplification as well as running time. The reasonable result of model is arranged to determine the initial condition of input data therefore steady state condition have agreement to the analysis result of one line cooling mode of RSG-GAS. Parameter investigated are transient temperatures of cooling system after decreasing of secondary cooling system occur as function of time. These parameters can be requested using input of Minor Edit Request Simulation is conducted at the reactor power of 15 MW steady-state for one-line cooling mode in which the primary and secondary cooling of 430 kg/sec and 550 kg/sec respectively. Decreasing of secondary cooling flow is caused by pump trip. As a consequence, the control rod drop due to reactor protection system. The negative reactivity of control rod causes decreasing of reactor power. Change of pattern for the primary and secondary cooling system can be known. After that simulation depicts that increasing of temperatures occur at the certain moment since initiation temperature conditions, due to reactor shut down, curve inclined move going down. (author)

  16. The influence of instrumental line shape degradation on NDACC gas retrievals: total column and profile

    Directory of Open Access Journals (Sweden)

    Y. Sun

    2018-05-01

    Full Text Available We simulated instrumental line shape (ILS degradations with respect to typical types of misalignment, and compared their influence on each NDACC (Network for Detection of Atmospheric Composition Change gas. The sensitivities of the total column, the root mean square (rms of the fitting residual, the total random uncertainty, the total systematic uncertainty, the total uncertainty, degrees of freedom for signal (DOFs, and the profile with respect to different levels of ILS degradation for all current standard NDACC gases, i.e. O3, HNO3, HCl, HF, ClONO2, CH4, CO, N2O, C2H6, and HCN, were investigated. The influence of an imperfect ILS on NDACC gases' retrieval was assessed, and the consistency under different meteorological conditions and solar zenith angles (SZAs were examined. The study concluded that the influence of ILS degradation can be approximated by the linear sum of individual modulation efficiency (ME amplitude influence and phase error (PE influence. The PE influence is of secondary importance compared with the ME amplitude. Generally, the stratospheric gases are more sensitive to ILS degradation than the tropospheric gases, and the positive ME influence is larger than the negative ME. For a typical ILS degradation (10 %, the total columns of stratospheric gases O3, HNO3, HCl, HF, and ClONO2 changed by 1.9, 0.7, 4, 3, and 23 %, respectively, while the columns of tropospheric gases CH4, CO, N2O, C2H6, and HCN changed by 0.04, 2.1, 0.2, 1.1, and 0.75 %, respectively. In order to suppress the fractional difference in the total column for ClONO2 and other NDACC gases within 10 and 1 %, respectively, the maximum positive ME degradations for O3, HNO3, HCl, HF, ClONO2, CO, C2H6, and HCN should be less than 6, 15, 5, 5, 5, 5, 9, and 13 %, respectively; the maximum negative ME degradations for O3, HCl, and HF should be less than 6, 12, and 12 %, respectively; the influence of ILS degradation on CH4 and N2O can be regarded as being

  17. Research project RoboGas{sup Inspector}. Gas leak detection with autonomous mobile robots; Forschungsprojekt RoboGas{sup Inspector}. Gaslecksuche mit autonomen mobilen Robotern

    Energy Technology Data Exchange (ETDEWEB)

    Habib, Abdelkarim [BAM Bundesanstalt fuer Materialforschung und -pruefung, Berlin (Germany); Bonow, Gero; Kroll, Andreas [Fachgebiet Mess- und Regelungstechnik, Universitaet Kassel, Kassel (Germany); Hegenberg, Jens; Schmidt, Ludger [Fachgebiet Mensch-Maschine-Systemtechnik, Universitaet Kassel, Kassel (Germany); Barz, Thomas; Schulz, Dirk [Fraunhofer FKIE, Unbemannte Systeme, Wachtberg (Germany)

    2013-05-15

    As part of the promotional program AUTONOMIK of the Federal Ministry of Economics and Technology (Berlin, Federal Republic of Germany) a consortium of nine project partners developed a prototype of an autonomous mobile robot looking for gas leaks in extended industrial equipment. The autonomous mobility of the system for any systems was implemented using different types of sensors for self-localization and navigation. The tele-operation enables a manual intervention in the process. The robot performs inspection tasks in industrial plants by means of video technology and remote gas measurement technology without driving into the possible risk areas and without the presence of humans. The robot can be used for routine inspections of facilities or for the targeted inspection of specific plant components. Thanks to the remote sensing technique also plant components can be inspected which are difficult to be inspected due to their limited accessibility by conventional measurement techniques.

  18. Coordination of Project and Current Activities on the Basis of the Strategy Alignment Metamodel in the Oil and Gas Company

    Directory of Open Access Journals (Sweden)

    R. Yu. Dashkov

    2017-01-01

    s departments. This model and the Networks of Goals and Strategies of the project and current activities, which are produced on its basis, have found practical application in the realization of construction project of production line of the LNG plant (Liquefied Natural Gas and have led to effective communication between the Project office, departments and external stakeholders. Conclusions and Relevance: these studies show that the Strategy Alignment Metamodel is effective in the coordination of the project and current activities; as a result it is possible to agree the Contexts and Assumptions as well as Goals and Strategies. Forming Networks of Goals and Strategies, it is easier to monitor the activities of the departments of the company in case of their participation in the execution of the project phases and divide responsibilities between them. Application of Strategy Alignment Metamodel leads to better identification and management of risks that arise due to poor communication of the Project office with the departments of the company in delegation of works on the project Phases execution. Single database for Networks of Goals and Stretegies, Contexts and Assumptions, Goals and Strategies Alignment Matrices can serve as templates for future projects and training of the company’s project managers. 

  19. A program to develop the domestic natural gas industry in Indonesia: Case history of two World Bank projects

    International Nuclear Information System (INIS)

    Klass, D.L.; Khwaja, S.

    1991-01-01

    Indonesia depends heavily on revenues from the export of LNG and oil, the availability of which appears to be decreasing. It is therefore making a strong effort to accelerate development of a domestic natural gas industry. A high priority has been given to the conversion of power plants and city gas systems, including local industries and commercial facilities, from liquid fuels to natural gas. This will release more oil for export, help to meet the objectives of Repelita V, and provide substantial environmental benefits. The World Bank recently provided loans to the Indonesian Government for two projects that are aimed at substituting natural gas for oil and manufactured gas in domestic markets. One project involves expansion of the gas distribution systems of Indonesia's natural gas utility (PGN) in three cities: Jakarta and Bogor in Java, and Medan in Sumatra. The project also includes training programs for PGN staff and an energy pricing policy study to be carried out by Indonesia's Ministry of Mines and Energy. The second project involves expansion of the supply of natural gas for Surabaya and twelve other towns in its vicinity in East Java, and further expansion of Medan's supply system. Technical assistance will be provided to enhance the skills ofPGN and the Ministry of Mines and Energy, and a Gas Technology Unit similar to the Institute of Gas Technology will be established at Indonesia's Research and Development Center for Oil and Gas (LEMIGAS) in Jakarta. 14 refs., 3 figs., 11 tabs

  20. Materials and Structures Research for Gas Turbine Applications Within the NASA Subsonic Fixed Wing Project

    Science.gov (United States)

    Hurst, Janet

    2011-01-01

    A brief overview is presented of the current materials and structures research geared toward propulsion applications for NASA s Subsonic Fixed Wing Project one of four projects within the Fundamental Aeronautics Program of the NASA Aeronautics Research Mission Directorate. The Subsonic Fixed Wing (SFW) Project has selected challenging goals which anticipate an increasing emphasis on aviation s impact upon the global issue of environmental responsibility. These goals are greatly reduced noise, reduced emissions and reduced fuel consumption and address 25 to 30 years of technology development. Successful implementation of these demanding goals will require development of new materials and structural approaches within gas turbine propulsion technology. The Materials and Structures discipline, within the SFW project, comprise cross-cutting technologies ranging from basic investigations to component validation in laboratory environments. Material advances are teamed with innovative designs in a multidisciplinary approach with the resulting technology advances directed to promote the goals of reduced noise and emissions along with improved performance.

  1. Molecular gas in the Herschel-selected strongly lensed submillimeter galaxies at z 2-4 as probed by multi-J CO lines

    Science.gov (United States)

    Yang, C.; Omont, A.; Beelen, A.; Gao, Y.; van der Werf, P.; Gavazzi, R.; Zhang, Z.-Y.; Ivison, R.; Lehnert, M.; Liu, D.; Oteo, I.; González-Alfonso, E.; Dannerbauer, H.; Cox, P.; Krips, M.; Neri, R.; Riechers, D.; Baker, A. J.; Michałowski, M. J.; Cooray, A.; Smail, I.

    2017-12-01

    . The total mass of the molecular gas reservoir, (1-30) × 1010M⊙, derived based on the CO(3-2) fluxes and αCO(1-0) = 0.8 M⊙ ( K km s-1 pc2)-1, suggests a typical molecular gas depletion time tdep 20-100 Myr and a gas to dust mass ratio δGDR 30-100 with 20%-60% uncertainty for the SMGs. The ratio between CO line luminosity and the dust mass L'CO/Mdust appears to be slowly increasing with redshift for high-redshift SMGs, which need to be further confirmed by a more complete SMG sample at various redshifts. Finally, through comparing the linewidth of CO and H2O lines, we find that they agree well in almost all our SMGs, confirming that the emitting regions of the CO and H2O lines are co-spatially located. Herschel is an ESA space observatory with science instruments provided by European-led Principal Investigator consortia and with important participation from NASA.Based on observations carried out under project number 076-16, 196-15 and 079-15 (PI: C. Yang); 252-11 and 124-11 (PI: P. van de Werf) with the IRAM-30 m Telescope. IRAM is supported by INSU/CNRS (France), MPG (Germany) and IGN (Spain).The reduced spectra (FITS files) are only available at the CDS via anonymous ftp to http://cdsarc.u-strasbg.fr (http://130.79.128.5) or via http://cdsarc.u-strasbg.fr/viz-bin/qcat?J/A+A/608/A144

  2. A New Radio Spectral Line Survey of Planetary Nebulae: Exploring Radiatively Driven Heating and Chemistry of Molecular Gas

    Science.gov (United States)

    Bublitz, Jesse

    Planetary nebulae contain shells of cold gas and dust whose heating and chemistry is likely driven by UV and X-ray emission from their central stars and from wind-collision-generated shocks. We present the results of a survey of molecular line emissions in the 88 - 235 GHz range from nine nearby (Radioastronomie Millimetrique. Rotational transitions of nine molecules, including the well-studied CO isotopologues and chemically important trace species, were observed and the results compared with and augmented by previous studies of molecular gas in PNe. Lines of the molecules HCO+, HNC, HCN, and CN, which were detected in most objects, represent new detections for five planetary nebulae in our study. Flux ratios were analyzed to identify correlations between the central star and/or nebular ultraviolet/X-ray luminosities and the molecular chemistries of the nebulae. Analysis reveals the apparent dependence of the HNC/HCN line ratio on PN central star UV luminosity. There exists no such clear correlation between PN X-rays and various diagnostics of PN molecular chemistry. The correlation between HNC/HCN ratio and central star UV luminosity hints at the potential of molecular emission line studies of PNe for improving our understanding of the role that high-energy radiation plays in the heating and chemistry of photodissociation regions.

  3. Thermal analysis of LOFT waste gas processing system nitrogen supply for process line purge and blower seal

    International Nuclear Information System (INIS)

    Tatar, G.A.

    1979-01-01

    The LOFT Waste Gas Processing System uses gaseous nitrogen (GN 2 ) to purge the main process line and to supply pressure on the blower labyrinth seal. The purpose of this analysis was to determine the temperature of the GN 2 at the blower seals and the main process line. Since these temperatures were below 32 0 F the heat rate necessary to raise these temperatures was calculated. This report shows that the GN 2 temperatures at the points mentioned above were below 10 0 F. A heat rate into the GN 2 of 389 Watts added at the point where the supply line enters the vault would raise the GN 2 temperature above 32 0 F

  4. A New Radio Spectral Line Survey of Planetary Nebulae: Exploring Radiatively-driven Heating and Chemistry of Molecular Gas

    Science.gov (United States)

    Bublitz, Jesse; Kastner, Joel H.; Santander-García, Miguel; Montez, Rodolfo; Alcolea, Javier; Balick, Bruce; Bujarrabal, Valentín

    2018-01-01

    We report the results of a survey of mm-wave molecular line emission from nine nearby (Radioastronomie Millimétrique (IRAM) 30 m telescope. Our sample comprises molecule-rich PNe spanning a wide range of central star UV luminosities as well as central star and nebular X-ray emission properties. Nine molecular line frequencies were chosen to investigate the molecular chemistry of these nebulae. New detections of one or more of five molecules -- the molecular mass tracer 13CO and the chemically important trace species HCO+, CN, HCN, and HNC -- were made in at least one PN. We present analysis of emission line flux ratios that are potential diagnostics of the influence that ultraviolet and X-ray radiation have on the chemistry of residual molecular gas in PNe.

  5. Risks Associated with Unconventional Gas Extraction Projects. Induced Seismicity, NORM and Ecological Risks

    International Nuclear Information System (INIS)

    Rodrigo-Naharro, J.; Hurtado, A.; Eguilior, S.; Recreo, F.

    2015-01-01

    The latest technological advances in hydraulic fracturing (fracking) and horizontal drilling are globally driving the commercial extraction of unconventional resources. Although there is still no commercial exploitation of these resources within the EU, the fact that there are potential reserves in some countries, such as Spain, stimulates the need of performing preliminary studies to define the characteristics that an unconventional gas extraction project should consider. The object of these features are the safety of the project, thus minimizing the probabilities of negative environmental impacts, and especially since there is not any EU Framework Directive focusing on the regulation of the operation of such fossil fuels. A project of this nature, involving natural systems, must start from the knowledge of these systems and from an assessment of its features in order to reach the environmental safety of the operations. Moreover, the implementation of risk management systems, along with the existence of an appropriate legislation and supervision are key elements in the development of unconventional gas extraction projects that are environmentally friendly. The present report includes, among the overall risks associated with such projects, those related to: i) the induced seismicity; ii) the Naturally-Occurring Radioactive Materials (NORM); and iii) the ecology.

  6. Entanglement in bipartite pure states of an interacting boson gas obtained by local projective measurements

    International Nuclear Information System (INIS)

    Paraan, Francis N. C.; Korepin, Vladimir E.; Molina-Vilaplana, Javier; Bose, Sougato

    2011-01-01

    We quantify the extractable entanglement of excited states of a Lieb-Liniger gas that are obtained from coarse-grained measurements on the ground state in which the boson number in one of two complementary contiguous partitions of the gas is determined. Numerically exact results obtained from the coordinate Bethe ansatz show that the von Neumann entropy of the resulting bipartite pure state increases monotonically with the strength of repulsive interactions and saturates to the impenetrable-boson limiting value. We also present evidence indicating that the largest amount of entanglement can be extracted from the most probable projected state having half the number of bosons in a given partition. Our study points to a fundamental difference between the nature of the entanglement in free-bosonic and free-fermionic systems, with the entanglement in the former being zero after projection, while that in the latter (corresponding to the impenetrable-boson limit) being nonzero.

  7. Improved gas installations and services. Phase 1: Analysis project. Part report

    International Nuclear Information System (INIS)

    Nielsen, K.J.

    1996-05-01

    As Danish gas companies receive a large number of complaints related to the installation and operation of gas installations it was suggested that a course for personnel should be established in order to raise the standard of services and installation requirements. The first phase of the described project was to evaluate the quality of the gas installers' services so as to determine which aspects of installation and services should be emphasized during such a course. Interviews were carried out and questionnaires (illustrated within the document) sent out to installaters etc. Recommendations include that the level of information given to customers should be raised, also in relation to maintenance, and that installation should be improved. Analyses of the degree of customers' satisfaction, of the nature of the quality of services etc. expected, subjects for further training in this area and details of the training system are dealt with

  8. Liquefied natural gas projects in Altamira: impacts on the prices of the natural gas; Proyectos de gas natural licuado en Altamira: impactos sobre los precios del gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Perez Cordova, Hugo; Elizalde Baltierra, Alberto [Petroleos Mexicanos (PEMEX), (Mexico)

    2004-06-15

    The possible incorporation of new points of supply of natural gas to the Sistema National de Gasoductos (SNG) through the import of Liquified Natural Gas or (GNL) could cause an important modification in the national balance of supply-demand of the fuel and in its price, if large volumes are received. An analysis is presented of the possible impact that would have in the natural gas national market and in its prices the import of GNL made by the region of Altamira, Tamaulipas. [Spanish] La posible incorporacion de nuevos puntos de oferta de gas natural al Sistema Nacional de Gasoductos (SNG) a traves de la importacion de Gas Natural Licuado (GNL), podria provocar una modificacion importante en el balance oferta-demanda nacional del combustible y en su precio, si se reciben fuertes volumenes. Se presenta un analisis del posible impacto que tendria en el mercado nacional del gas natural y en sus precios la importacion de GNL realizada por la region de Altamira, Tamaulipas.

  9. 77 FR 55208 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2012-09-07

    ... Southside Expansion Project (Project) involving construction and operation of facilities by Transcontinental... Beginning at 6:30 p.m., Brian's Restaurant (upstairs room), 625 East Atlantic Ave., South Hill, VA 23970.... The Project would include construction and operation of the following facilities: Approximately 91.4...

  10. The integrated melter off-gas treatment systems at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Vance, R.F.

    1991-12-01

    The West Valley Demonstration project was established by an act of Congress in 1980 to solidify the high level radioactive liquid wastes produced from operation of the Western New York Nuclear Services Center from 1966 to 1972. The waste will be solidified as borosilicate glass. This report describes the functions, the controlling design criteria, and the resulting design of the melter off-gas treatment systems

  11. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix A: BP Exploration (Alaska) Inc. Final project description - Revision 1, March 27, 1997

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendix A of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. This document is the Northstar Development Project, Final Project Description, Revision 1 for BPXA Northstar Project

  12. Risk analysis for construction and operation of gas pipeline projects in pakistan

    International Nuclear Information System (INIS)

    Mubin, S.; Mubin, G.

    2008-01-01

    In order to cater for its high energy demand, Pakistan is planning to import natural gas through pipelines from neighboring countries. For fully utilizing the imported gas, providing it to end customers, the infrastructure of gas pipeline needs to be developed. Therefore, huge investment has been done and proposed in this sector in coming future. Considering geological, topographical, geopolitical and climatic conditions of the country, there is added risk of earthquake, landslides and floods. Due to current geopolitical situation there is a persistent threat of unrest and terrorism in the country. Instable Government policies, high rate of inflation, rapid change in material prices are also important risk factors. All these factors make the situation very complex in quantifying the risk especially for a project in which the risk impact factor rises exponentially in case of risk occurrence. In this paper, most appropriate risk classification is made based on technological, organizational, political, natural climatic, security and environmental risk factors. Effort has been made to device a simpler risk management methodology to analyze and manage risks of gas pipeline project. In the proposed risk management model Monte Carlo simulation has been used to identify critical risks. (author)

  13. Molecular hydrogen line ratios in four regions of shock-excited gas

    International Nuclear Information System (INIS)

    Burton, M.G.

    1989-01-01

    Five emission lines of molecular hydrogen, with wavelengths in the ranges of 2.10-2.25 and 3.80-3.85 μm, have been observed in four objects of different type in which the line emission is believed to be excited by shocks. (author)

  14. Development of an on-line low gas pressure cell for laser ablation-ICP-mass spectrometry

    International Nuclear Information System (INIS)

    Hirata, Takafumi

    2007-01-01

    An on-line low gas pressure cell device has been developed for elemental analysis using laser ablation-ICP-mass spectrometry (LA-ICPMS). Ambient gas in the sample cell was evacuated by a constant-flow diaphragm pump, and the pressure of the sample cell was controlled by changing the flow rate of He-inlet gas. The degree of sample re-deposition around the ablation pit could be reduced when the pressure of the ambient gas was lower than 50 kPa. Produced sample aerosol was drawn and taken from the outlet of the diaphragm pump, and directly introduced into the ICP ion source. The flow rate of He gas controls not only the gas pressure in the sample cell, but also the transport efficiency of the sample particles from the cell to the ICP, and the gas flow rate must be optimized to maximize the signal intensity of the analytes. The flow rates of the He carrier and Ar makeup gas were tuned to maximize the signal intensity of the analytes, and in the case of 238 U from the NIST SRM610 glass material, the signal intensity could be maximized with gas flow rates of 0.4 L/min for He and 1.2 L/min for Ar. The resulting gas pressure in the cell was 30-35 kPa. Using the low gas pressure cell device, the stability in the signal intensities and the resulting precision in isotopic ratio measurements were evaluated. The signal intensity profile of 63 Cu obtained by laser ablation from a metallic sample (NIST SRM976) demonstrated that typical spikes in the transient signal, which can become a large source of analytical error, were no longer found. The resulting precision in the 65 Cu/ 63 Cu ratio measurements was 2-3% (n=10, 2SD), which was half on the level obtained by laser ablation under atmospheric pressure (6-10%). The newly developed low-pressure cell device provides easier optimization of the operational conditions, together with smaller degrees of sample re-deposition and better stability in the signal intensity, even from a metallic sample. (author)

  15. CARMA Large Area Star Formation Survey: project overview with analysis of dense gas structure and kinematics in Barnard 1

    Energy Technology Data Exchange (ETDEWEB)

    Storm, Shaye; Mundy, Lee G.; Lee, Katherine I.; Teuben, Peter; Pound, Marc W.; Salter, Demerese M.; Chen, Che-Yu; Gong, Hao [Department of Astronomy, University of Maryland, College Park, MD 20742 (United States); Fernández-López, Manuel; Looney, Leslie W.; Segura-Cox, Dominique M. [Department of Astronomy, University of Illinois at Urbana-Champaign, 1002 West Green Street, Urbana, IL 61801 (United States); Rosolowsky, Erik [Departments of Physics and Statistics, University of British Columbia, Okanagan Campus, 3333 University Way, Kelowna BC V1V 1V7 (Canada); Arce, Héctor G.; Plunkett, Adele L. [Department of Astronomy, Yale University, P.O. Box 208101, New Haven, CT 06520-8101 (United States); Ostriker, Eve C. [Department of Astrophysical Sciences, Princeton University, Princeton, NJ 08544 (United States); Volgenau, Nikolaus H. [Owens Valley Radio Observatory, MC 105-24 OVRO, Pasadena, CA 91125 (United States); Shirley, Yancy L. [Steward Observatory, 933 North Cherry Avenue, Tucson, AZ 85721 (United States); Tobin, John J. [National Radio Astronomy Observatory, Charlottesville, VA 22903 (United States); Kwon, Woojin [SRON Netherlands Institute for Space Research, Landleven 12, 9747 AD Groningen (Netherlands); Isella, Andrea, E-mail: sstorm@astro.umd.edu [Astronomy Department, California Institute of Technology, 1200 East California Blvd., Pasadena, CA 91125 (United States); and others

    2014-10-20

    We present details of the CARMA Large Area Star Formation Survey (CLASSy), while focusing on observations of Barnard 1. CLASSy is a CARMA Key Project that spectrally imaged N{sub 2}H{sup +}, HCO{sup +}, and HCN (J = 1 → 0 transitions) across over 800 square arcminutes of the Perseus and Serpens Molecular Clouds. The observations have angular resolution near 7'' and spectral resolution near 0.16 km s{sup –1}. We imaged ∼150 square arcminutes of Barnard 1, focusing on the main core, and the B1 Ridge and clumps to its southwest. N{sub 2}H{sup +} shows the strongest emission, with morphology similar to cool dust in the region, while HCO{sup +} and HCN trace several molecular outflows from a collection of protostars in the main core. We identify a range of kinematic complexity, with N{sub 2}H{sup +} velocity dispersions ranging from ∼0.05 to 0.50 km s{sup –1} across the field. Simultaneous continuum mapping at 3 mm reveals six compact object detections, three of which are new detections. A new, non-binary dendrogram algorithm is used to analyze dense gas structures in the N{sub 2}H{sup +} position-position-velocity (PPV) cube. The projected sizes of dendrogram-identified structures range from about 0.01 to 0.34 pc. Size-linewidth relations using those structures show that non-thermal line-of-sight velocity dispersion varies weakly with projected size, while rms variation in the centroid velocity rises steeply with projected size. Comparing these relations, we propose that all dense gas structures in Barnard 1 have comparable depths into the sky, around 0.1-0.2 pc; this suggests that overdense, parsec-scale regions within molecular clouds are better described as flattened structures rather than spherical collections of gas. Science-ready PPV cubes for Barnard 1 molecular emission are available for download.

  16. The integrated melter off-gas treatment systems at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Vance, R.F. [West Valley Nuclear Services Co., Inc., NY (United States)

    1995-02-01

    The West Valley Demonstration Project was established by Public Law 96-368, the {open_quotes}West Valley Demonstration Project Act, {close_quotes} on October 1, l980. Under this act, Congress directed the Department of Energy to carry out a high level radioactive waste management demonstration project at the Western New York Nuclear Service Center in West Valley, New York. The purpose of this project is to demonstrate solidification techniques which can be used for preparing high level radioactive waste for disposal. In addition to developing this technology, the West Valley Demonstration Project Act directs the Department of Energy to: (1) develop containers suitable for permanent disposal of the high level waste; (2) transport the solidified high level waste to a Federal repository; (3) dispose of low level and transuranic waste produced under the project; and (4) decontaminate and decommission the facilities and materials associated with project activities and the storage tanks originally used to store the liquid high level radioactive waste. The process of vitrification will be used to solidify the high level radioactive liquid wastes into borosilicate glass. This report describes the functions, the controlling design criteria, and the resulting design of the melter off-gas treatment systems which are used in the vitrification process.

  17. Basic studies of a gas-jet-coupled ion source for on-line isotope separation

    International Nuclear Information System (INIS)

    Anderl, R.A.; Novick, V.J.; Greenwood, R.C.

    1980-01-01

    A hollow-cathode ion source was used in a gas-jet-coupled configuration to produce ion beams of fission products transported to it from a 252 Cf fission source. Solid aerosols of NaCl and Ag were used effectively as activity carriers in the gas-jet system. Flat-plate skimmers provided an effective coupling of the ion source to the gas jet. Ge(Li) spectrometric measurements of the activity deposited on an ion-beam collector relative to that deposited on a pre-skimmer collector were used to obtain separation efficiencies ranging from 0.1% to > 1% for Sr, Y, Tc, Te, Cs, Ba, Ce, Pr, Nd and Sm. The use of CCl 4 as a support gas resulted in a significant enhancement of the alkaline-earth and rare-earth separation efficiencies

  18. U.S., Canadian pipelines producers lining up to meet Mexican gas demand growth

    International Nuclear Information System (INIS)

    Koen, A.D.

    1992-01-01

    This paper reports on prospects for continued strong growth in Mexican demand for natural gas imports that have U.S. and Canadian producers and pipelines queueing up to serve expected demand. In 1991, more than 25 U.S. companies exported a combined 61.7 bcf of gas into Mexico, an increase of more than 390% from 1990's total of 15.7 bcf. According to the Department of Energy Office of Fuels Programs (OFP), about 27.5 bcf of gas left the U.S. for Mexico in fourth quarter 1991 alone, an average 299 MMcfd. DOE has granted short term authorization to more than 65 countries to export gas into Mexico. Another 25 companies have short term export applications pending

  19. 77 FR 28618 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Draft...

    Science.gov (United States)

    2012-05-15

    ...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Draft Environmental... & Electric (SDG&E) Ocotillo Sol Solar Project in Imperial County, California, and by this notice is... comments related to the SDG&E Ocotillo Sol Solar Project by any of the following methods: Web site: http...

  20. 78 FR 45268 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final...

    Science.gov (United States)

    2013-07-26

    ...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final Environmental...) Ocotillo Sol Solar Project in Imperial County, California, and by this notice is announcing its... Ocotillo Sol Solar Project Final EIS/Proposed CDCA Plan Amendment have been sent to affected Federal, State...

  1. Law project on the gas utility modernization and gas industries development. Law project synthesis on the gas utility modernization and gas industries development; Projet de loi relatif a la modernisation du service public du gaz naturel et au developpement des entreprises gazieres.Synthese du projet de loi sur la modernisation du service public du gaz et le developpement des entreprises gazieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-05-01

    The french government would like to develop a law concerning the gas utility modernization and gas industries development, which completes the today system, more particularly, the law of 1946. This project specifies and comforts the gas utility, it gives to the energy policy tools adapted to the new european context. It helps the natural gas industry to become more competitive. The method chosen by the government is presented and discussed in these three documents. (A.L.B.)

  2. Density-independent population projection trajectories of chromosome-substituted lines resistant and susceptible to organophosphate insecticides in Drosophila melanogaster

    Directory of Open Access Journals (Sweden)

    Miyo Takahiro

    2004-11-01

    Full Text Available Abstract Background Seasonal fluctuations in susceptibility to organophosphate insecticides were observed in the Katsunuma population of Drosophila melanogaster for two consecutive years; susceptibility to three organophosphates tended to increase in the fall. To examine the hypothesis that variation in fitness among resistant and susceptible genotypes could trigger the change of genetic constitution within the fall population, we investigated density-independent population projection trajectories starting from single adult females with characteristics of chromosome-substituted lines resistant and susceptible to the three organophosphates. Results Density-independent population projection trajectories, expressed as the ratios of the number of each chromosome-substituted line to that of line SSS, for which all chromosomes were derived from the susceptible line, showed significant declines in numbers with time for all the resistant chromosome-substituted lines. Conclusion The declining tendency in the density-independent population projection trajectories of the resistant chromosome-substituted lines could explain the simultaneous decline in the levels of resistance to the three organophosphates, observed in the Katsunuma population in the fall.

  3. On-Line Digital Computer Applications in Gas Chromatography, An Undergraduate Analytical Experiment

    Science.gov (United States)

    Perone, S. P.; Eagleston, J. F.

    1971-01-01

    Presented are some descriptive background materials and the directions for an experiment which provides an introduction to on-line computer instrumentation. Assumes students are familiar with the Purdue Real-Time Basic (PRTB) laboratory computer system. (PR)

  4. Contact line motion in confined liquid–gas systems: Slip versus phase transition

    KAUST Repository

    Xu, Xinpeng; Qian, Tiezheng

    2010-01-01

    -slip boundary condition, as the latter leads to a nonintegrable stress singularity. Recently, various diffuse-interface models have been proposed to explain the contact line motion using mechanisms missing from the sharp-interface treatments in fluid mechanics

  5. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  6. The LLAMA Project: A SINFONI Study of Gas Outflows and Feeding in Local, X-ray Selected AGN

    Science.gov (United States)

    Shimizu, Thomas Taro; Davies, Richard; Burtscher, Leonard; Lin, Ming-yi

    2018-01-01

    We present new results from our survey of the inner few hundred parsecs of nearby galaxies as part of our Local Luminous AGN with Matched Analogues (LLAMA) project. AGN within the LLAMA sample were selected based on detection at ultra-hard X-rays (14-195 keV) by the Swift/Burst Alert Telescope ensuring the definitive presence of an AGN. We further imposed a redshift (z 42.5) cutoff to create a complete and volume-limited sample of nearby, luminous AGN. Inactive galaxies were chosen carefully by matching in redshift, host galaxy morphology, inclination, and stellar mass to create a clean sample with which to compare to the AGN. A subset of LLAMA AGN and inactive galaxies were observed with VLT/SINFONI using adaptive optics producing high spatial resolution integral field unit spectra in the H and K band. This unique IFU data allows for analysis of a suite of NIR emission lines including [FeII], H2 (1-0) S(1), [SiVI], and Br-gamma to probe the ionized and warm molecular gas in the circumnuclear region as well as CO absorption lines to probe the stellar disk. I will present initial results from our study including the prevalence of AGN outflows along with their geometry, kinematics, and mass outflow rates and compare the mass, state, and excitation mechanisms of circumnuclear gas between AGN and inactive galaxies. Finally, I will discuss our results in the context of AGN fuelling and feedback and provide insight on interpreting similar data at higher redshift.

  7. Beyond the line: exploring the HRM responsibilities of line managers, project managers and the HRM department in four project-oriented companies in the Netherlands, Austria, the UK and the USA

    NARCIS (Netherlands)

    Keegan, A.; Huemann, M.; Turner, J.R.

    2012-01-01

    The topic of what human resource management (HRM) responsibilities are devolved from the HRM department to line managers has attracted much interest in recent years. We report findings from a study on the devolution of HRM practices in four project-oriented companies (POCs) and argue that although

  8. Analyzing Drivers of Conflict in Energy Infrastructure Projects: Empirical Case Study of Natural Gas Pipeline Sectors

    Directory of Open Access Journals (Sweden)

    Chan Young Park

    2017-11-01

    Full Text Available Energy infrastructure projects have caused various conflicts between stakeholders, particularly among the residents around construction sites and operators. The conflicts are largely due to the “Not in My Backyard” mentality associated with hazardous projects. In natural gas pipeline (NGP projects, conflicts have been increasing with the increase in a wider range of linear projects, and they have been worsening because of the lack of clear countermeasures. This study proposes an effective conflict management strategy for NGP projects in Korea. To achieve the objectives, 25 conflict drivers were identified and 143 case-based surveys were conducted to determine the causal relationship between the drivers and the level of conflict using structural equation modeling (SEM. The SEM results show that factors such as economic (e.g., decreased value of the land, construction-related (e.g., disturbance due to using the original route and site, and safety-related characteristics (e.g., concerns about explosions and accidents are the most important in understanding the causes of conflicts. Based on the causal relationship, five key strategies were proposed to manage the critical conflicts. This study can serve as a basis for implementing better conflict management plans in the future for a more sustainable project execution.

  9. An overview of turbomachinery project in Malaysian oil and gas industry

    Science.gov (United States)

    Abd. Rahman Sabri, Harris; Rahim, Abd. Rahman Abdul; Yew, Wong Kuan; Ismail, Syuhaida

    2017-12-01

    Being the most demanding, challenging and exciting engineering and technological advances has provided escalated interests amongst the engineers at large to venture into the oil and gas (O&G) industry. Although claimed as the most expensive industry in the world via the utilisation of critical equipments, the O&G industry is still recording notorius failures in its project management especially due to turbomachinery issues, the heart equipment of any O&G project. Therefore, it is important for this paper to review turbomachinery project as one of the long lead items during project executions that is also proven to be the most costly and expensive equipment. This paper therefore discusses the gaps in turbomachinery studies via literature review in highlighting its application in O&G projects. It is found that the main components of turbomachinery are driver and driven equipment, which are applied for mechanical equipment, Electric Power Generation and heat generation for Combined Cycled Configuration. Important variables for turbomachinery selection include: (1) process requirement; (2) site location; (3) driver selection; (4) equipment sparing philosophy; (5) efficiency and reliability; (6) operability and maintainability; and (7) cost. It is hoped that this paper would lead to the successful project management of turbomachinery in the O&G industry.

  10. 77 FR 787 - Transcontinental Gas Pipe Line Company, LLC; Notice of Application

    Science.gov (United States)

    2012-01-06

    .... Transco states that the proposed Project is an expansion of its existing pipeline system under which... Market Pool in New Jersey and the existing Manhattan, Central Manhattan, and Narrows delivery points in... appurtenant underground and minor aboveground facilities. The estimated cost of the proposed Project is $341...

  11. Negative Flash for Calculating the Intersecting Key Tie lines in Multicomponent Gas Injection

    DEFF Research Database (Denmark)

    Yan, Wei; Michelsen, Michael Locht; Stenby, Erling Halfdan

    2014-01-01

    Gas injection is a widely used enhanced oil recovery method, and its application is expected to increase in the foreseeable future. In order to build a method of characteristics solution to a two-phase gas injection system, we must construct the composition route from the injection gas...... to the initial oil where all the intersecting key tielines must be identified. Calculation of these intersecting tielines requires a series of special negative flashes, which allow not only phase fractions outside the physical interval [0,1] but also negative feed compositions. The phase compositions from one......-values are constant, there exists a simple feature that the vapor fraction roots (beta-roots) for the RachfordRice equation for the initial oil are the roots to be found in all the negative flashes involved. This leads to a simple and well-structured algorithm for the solution with constant K-values. A special...

  12. 76 FR 16609 - Proposed Information Collection; Comment Request; Identification of Human Cell Lines Project

    Science.gov (United States)

    2011-03-24

    ... differentiate among cell lines, as described in Designation: ASN-0002 Authentication of Human Cell Lines... NIST (contact information above). III. Data OMB Control Number: None. Form Number: None. Type of Review...

  13. Western Gas Sands Project. Status report, April 1--April 30, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C H

    1979-01-01

    Progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States is summarized. Work by the USGS toward resource assessment in the four primary study areas continued. Bartlesville Energy Technology Center continued work on fracture conductivity, rock-fluid interaction, and log evaluation and interpretation techniques. Experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data continued at Lawrence Livermore Laboratory. Gathering of bottom-hole pressure data from the Miller No. 1 well and Sprague No. 1 well in the Wattenberg Field, Colorado continued. Fracturing fluid/rock interaction tests have been completed by Terra Tek for Gas Producing Enterprises, Inc., on sandstone horizons in the lower Mesaverde. The Mitchell Energy Corporation Muse-Duke No. 1 was flowed 4,000 MCFGD in April. Fishing operations on the Mobil PCU F31-13G well were unsuccessful. Six zones of the first horizontal experimental hole in the Sandia Laboratories interface test series were mined back to examine the behavior of the hydraulic fracture at the interface. Data collection by CER Corporation and TRW for GRI's Analysis of Tight Formations project continued.

  14. Western Gas Sands Project. Status report, 1 June--30 June 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This edition of the WGSP status report summarizes June 1979 progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States. Background information is provided in the September 1977, status report, NVO/0655-100. Work by the USGS toward resource assessment in the four primary study areas continued. CK GeoEnergy started a core hole in Grand County, Utah. During June, projects of the National Laboratories and Energy Technology Centers continued. Bartlesville Energy Technology Center continued work on fracture conductivity, rock-fluid interaction, and log evaluation and interpretation techniques. Experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data continued at Lawrence Livermore Laboratory. The CER Corporation RB-MHF 3 final report has been distributed. Cyclic gas injection began again on CIG's Sprague No. 1 well. The DOE well test facility was transported to Vernal, Utah for minor repairs and storage. The GPE wells, Natural Buttes Units 9, 14 and 18 flowed to sales. The Mitchell Energy Muse-Duke No. 1 well flowed 3,000 MCFD in June. Attempts to kill the Mobil PCU F31-13G well failed. Exploratory coring of the Sandia Hole No. 6 Formation Interface Fracture Experiment resumed in June.

  15. Thermal Boundary Layer Effects on Line-of-Sight Tunable Diode Laser Absorption Spectroscopy (TDLAS) Gas Concentration Measurements.

    Science.gov (United States)

    Qu, Zhechao; Werhahn, Olav; Ebert, Volker

    2018-06-01

    The effects of thermal boundary layers on tunable diode laser absorption spectroscopy (TDLAS) measurement results must be quantified when using the line-of-sight (LOS) TDLAS under conditions with spatial temperature gradient. In this paper, a new methodology based on spectral simulation is presented quantifying the LOS TDLAS measurement deviation under conditions with thermal boundary layers. The effects of different temperature gradients and thermal boundary layer thickness on spectral collisional widths and gas concentration measurements are quantified. A CO 2 TDLAS spectrometer, which has two gas cells to generate the spatial temperature gradients, was employed to validate the simulation results. The measured deviations and LOS averaged collisional widths are in very good agreement with the simulated results for conditions with different temperature gradients. We demonstrate quantification of thermal boundary layers' thickness with proposed method by exploitation of the LOS averaged the collisional width of the path-integrated spectrum.

  16. On-line stable isotope measurements during plant and soil gas exchange

    International Nuclear Information System (INIS)

    Yakir, D.

    2001-01-01

    Recent techniques for on-line stable isotope measurements during plant and soil exchange of CO 2 and/or water vapor are briefly reviewed. For CO 2 , these techniques provide means for on-line measurements of isotopic discrimination during CO 2 exchange by leaves in the laboratory and in the field, of isotopic discrimination during soil respiration and during soil-atmosphere CO 2 exchange, and of isotopic discrimination in O 2 during plant respiration. For water vapor, these techniques provide means to measure oxygen isotopic composition of water vapor during leaf transpiration and for the analysis of sub microliter condensed water vapor samples. Most of these techniques involve on-line sampling of CO 2 and water vapor from a dynamic, intact soil or plant system. In the laboratory, these systems also allow on-line isotopic analysis by continuous-flow isotope ratio mass spectrometry. The information obtained with these on-line techniques is becoming increasingly valuable, and often critical, for ecophysiologial research and in the study of biosphere-atmosphere interactions. (author)

  17. The gas-phase on-line production of phosphoryl halides, Pox3 and their identification by infrared spectroscopy

    International Nuclear Information System (INIS)

    Allaf, A.W.

    1998-01-01

    A new route has been devised, leading to the production of Pox 3 molecules where X=F, Br and I by an on-line process using phosphoryl chloride, POCL 3 as a starting material passed over heated sodium fluoride, NaF, potassium bromide, KBr and potassium iodide, K1 at 535 Centigrade, 690 Centigrade and 480 Centigrade, respectively. The low resolution gas-phase fourier transform infrared spectra reported for the first time showed strong bands centered at 1411.6, 1322.9, 1300.8 and 1285 cm - 1, assigned to Ε 1 (a 1 ), the O = P stretching fundamental of POF 3 , POCL 3 , POBR 3 and POI 3 , respectively. Attempts were made to prepare POCL 2 and POBr 2 , by an on-line process using POCL 3 again but passed over heated sodium and potassium bromide for POCL 2 and POBr 2 . (author). 3 refs., 2 figs., 1 tab

  18. The gas-phase on-line production of vanadium oxytrihalides, VOX3 and their identification by infrared spectroscopy

    International Nuclear Information System (INIS)

    Zidan, M. D.; Allaf, A. W.

    2001-01-01

    A new route has been devised, leading to the production of VOX 3 molecules where X=F, Br and I by an on-line process using vanadium oxytrichloride, VOCl 3 as a starting compound passed over the following heated salts NaF, KBr and KI at 375, 700 and 550 centigrade, respectively. The products have been characterized by the IR spectra of their vapors. the low resolution gas phase on-line Fourier transform infrared spectra reported for the first time show strong bands with PQR type structure, centered at 1058, 1035, 1030 and 1025 cm -1 to the υ 1 (a 1 ), the O=V stretching fundamental mode of VOF 3 , VOCl 3 , VOBr 3 and VOI 3 , respectively. (Author)

  19. Analysis Of The Heat Exchanger Capability At One Line Cooling System Operation Mode Of The RSG-GAS

    International Nuclear Information System (INIS)

    Dibyo, Sukmanto; Kuntoro, Iman

    2000-01-01

    In the frame of minimizing the operation lost of the RSG-GAS reactor, operation using one line cooling system at certain power range is being evaluated. Analysis the performance of cooling system for determining maximum power should be carried out. Analysis was carried out based on heat exchanger calculation using actual operation data. Constraints imposed to the analysis are that inlet cooling system to the reactor core shall be less than 42 o C. The result shows that by using one line of primary and secondary coolant flow of 1780 m exp. 3/hr and 2000 m 3 /hr and secondary coolant temperature from the cooling tower of 38 o C, the primary coolant to the core will be reach 42 o C if reactor operated at power of 16 MW

  20. Potential Energy Curves and Associated Line Shape of Alkali-Metal and Noble-Gas Interactions

    Science.gov (United States)

    2014-10-20

    work. The ab initio calculations for M + Ng molecular combina- tions are reported and discussed in Chapter 3. Chapter 4 discusses both pedagogical ...mass of the noble-gas atom decreases. These barriers at R = rb are accompanied by shallow wells at R = rmin2 and, together with the shallow wells

  1. Unraveling the mysteries of the Leo Ring: An absorption line study of an unusual gas cloud

    Energy Technology Data Exchange (ETDEWEB)

    Rosenberg, J. L.; Haislmaier, Karl [School of Physics, Astronomy, and Computational Science, George Mason University, Fairfax, VA 22030 (United States); Giroux, M. L. [Department of Physics and Astronomy, East Tennessee State University, Johnson City, TN 37614 (United States); Keeney, B. A. [Center for Astrophysics and Space Astronomy, Department of Astrophysical and Planetary Sciences, University of Colorado, 389 UCB, Boulder, CO 80309 (United States); Schneider, S. E., E-mail: jrosenb4@gmu.edu [Department of Astronomy, University of Massachusetts, Amherst, MA 01003 (United States)

    2014-07-20

    Since the discovery of the large (2 × 10{sup 9} M{sub ☉}) intergalactic cloud known as the Leo Ring in the 1980s, the origin of this object has been the center of a lively debate. Determining the origin of this object is still important as we develop a deeper understanding of the accretion and feedback processes that shape galaxy evolution. We present Hubble Space Telescope/Cosmic Origins Spectrograph observations of three sightlines near the ring, two of which penetrate the high column density neutral hydrogen gas visible in 21 cm observations of the object. These observations provide the first direct measurement of the metallicity of the gas in the ring, an important clue to its origin. Our best estimate of the metallicity of the ring is ∼10% Z{sub ☉}, higher than expected for primordial gas but lower than expected from an interaction. We discuss possible modifications to the interaction and primordial gas scenarios that would be consistent with this metallicity measurement.

  2. On-line Automated Sample Preparation-Capillary Gas Chromatography for the Analysis of Plasma Samples.

    NARCIS (Netherlands)

    Louter, A.J.H.; van der Wagt, R.A.C.A.; Brinkman, U.A.T.

    1995-01-01

    An automated sample preparation module, (the automated sample preparation with extraction columns, ASPEC), was interfaced with a capillary gas chromatograph (GC) by means of an on-column interface. The system was optimised for the determination of the antidepressant trazodone in plasma. The clean-up

  3. Utilization of on-line corrosion monitoring in the flue gas cleaning system

    DEFF Research Database (Denmark)

    Montgomery, Melanie; Nielsen, Lars V.; Petersen, Michael B.

    2015-01-01

    fan. The corrosion rates measured with respect to time were correlated to plant data such as load, temperature, gas composition, water content as well as change in the fuel used. From these results it is clear that many shutdowns/start-ups influence corrosion and therefore cause decreased lifetime...

  4. Western Gas Sands Project. Status report, 1 July-31 July, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C H

    1979-01-01

    National Laboratories and Energy Technology Centers continued projects during July. Bartlesville Energy Technology Center continued work on core/fluid testing, fabrication of and improvements to confining pressure apparatus, advanced logging techniques and interpretation and reservoir simulation studies. At Lawrence Livermore Laboratory theoretical analysis and experimental programs continued for hydraulic fracturing. Testing of the borehole seismic and hydrophone systems for fracture mapping continued at Sandia Laboratories. The CER Corporation RB-MHF 3 well has been transferred to Rio Blanco Natural Gas Company for further testing. Cyclic gas injection and production continued at CIG's Miller No. 1 and Sprague No. 1 wells. The DOE well test facility was transported to the Rio Blanco Natural Gas Company well No. 397-19-1 Government. The cumulative production of Mitchell Energy Muse-Duke No. 1 as of July 31, 1979, was just over one billion cubic ft of gas. A flow log was run on the Mobil PCU F31-13G well. Exploratory coring for the Sandia Hole No. 6 fracture experiment continued in July with the completion of two additional holes.

  5. Feasibility improvement project for the gas turbine power plant in Iran

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Investigations and discussions have been given on measures to improve energy conservation and efficiency at a power plant of Kish Water and Power Company (KWPC) in Iran. The site has high ambient temperature throughout a year, making the gas turbine power plant capable of generating power only at about 70% of the rated output, with the power generation efficiency decreasing. The project has analyzed the current situation at the plant, and evaluated different means that appear effective in improving the efficiency, including the gas turbine absorbed air cooling system, the steam injection system, and the combined cycle. As a result of the discussions, it was revealed that energy saving effect can be obtained at 145 TJ with the gas turbine absorbed air cooling system, 224 TJ with the steam injection system, and 1017 TJ with the combined cycle. The annual reduction of greenhouse gas emission due to the above energy conservation would be about 11 thousand tons, 16.5 thousand tons, and 75 thousand tons, respectively. However, the investment payback period would be about 2.45 years, 8.31 years, and 14.21 years, respectively. Therefore, the profitability does not appear very attractive because of low fuel unit cost. (NEDO)

  6. Nahm transformation for parabolic Higgs bundles on the projective line-Case of non-semisimple residues

    Science.gov (United States)

    Szabó, Szilárd

    2017-12-01

    We extend our earlier construction of Nahm transformation for parabolic Higgs bundles on the projective line to solutions with not necessarily semisimple residues and show that it determines a holomorphic mapping on corresponding moduli spaces. The construction relies on suitable elementary modifications of the logarithmic Dolbeault complex.

  7. Possibilities of mercury removal in the dry flue gas cleaning lines of solid waste incineration units.

    Science.gov (United States)

    Svoboda, Karel; Hartman, Miloslav; Šyc, Michal; Pohořelý, Michael; Kameníková, Petra; Jeremiáš, Michal; Durda, Tomáš

    2016-01-15

    Dry methods of the flue gas cleaning (for HCl and SO2 removal) are useful particularly in smaller solid waste incineration units. The amount and forms of mercury emissions depend on waste (fuel) composition, content of mercury and chlorine and on the entire process of the flue gas cleaning. In the case of high HCl/total Hg molar ratio in the flue gas, the majority (usually 70-90%) of mercury is present in the form of HgCl2 and a smaller amount in the form of mercury vapors at higher temperatures. Removal of both main forms of mercury from the flue gas is dependent on chemical reactions and sorption processes at the temperatures below approx. 340 °C. Significant part of HgCl2 and a small part of elemental Hg vapors can be adsorbed on fly ash and solid particle in the air pollution control (APC) processes, which are removed in dust filters. Injection of non-impregnated active carbon (AC) or activated lignite coke particles is able to remove mainly the oxidized Hg(2+) compounds. Vapors of metallic Hg(o) are adsorbed relatively weakly. Much better chemisorption of Hg(o) together with higher sorbent capacity is achieved by AC-based sorbents impregnated with sulfur, alkali poly-sulfides, ferric chloride, etc. Inorganic sorbents with the same or similar chemical impregnation are also applicable for deeper Hg(o) removal (over 85%). SCR catalysts convert part of Hg(o) into oxidized compounds (HgO, HgCl2, etc.) contributing to more efficient Hg removal, but excess of NH3 has a negative effect. Both forms, elemental Hg(o) and HgCl2, can be converted into HgS particles by reacting with droplets/aerosol of poly-sulfides solutions/solids in flue gas. Mercury captured in the form of water insoluble HgS is more advantageous in the disposal of solid waste from APC processes. Four selected options of the dry flue gas cleaning with mercury removal are analyzed, assessed and compared (in terms of efficiency of Hg-emission reduction and costs) with wet methods and retrofits for more

  8. Equations for nickel-chromium wire heaters of column transfer lines in gas chromatographic-electroantennographic detection (GC-EAD).

    Science.gov (United States)

    Byers, John A

    2004-05-30

    Heating of chromatographic columns, transfer lines, and other devices is often required in neuroscience research. For example, volatile compounds passing through a capillary column of a gas chromatograph (GC) can be split, with half exiting the instrument through a heated transfer line to an insect antenna or olfactory sensillum for electroantennographic detector (GC-EAD) recordings. The heated transfer line is used to prevent condensation of various chemicals in the capillary that would otherwise occur at room temperature. Construction of such a transfer line heater is described using (80/20%) nickel-chromium heating wire wrapped in a helical coil and powered by a 120/220 V ac rheostat. Algorithms were developed in a computer program to estimate the voltage at which a rheostat should be set to obtain the desired heater temperature for a specific coil. The coil attributes (radius, width, number of loops, or length of each loop) are input by the user, as well as AWG size of heating wire and desired heater temperature. The program calculates total length of wire in the helix, resistance of the wire, amperage used, and the voltage to set the rheostat. A discussion of semiochemical isolation methods using the GC-EAD and bioassays is presented.

  9. 77 FR 47058 - Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental...

    Science.gov (United States)

    2012-08-07

    ... effects of the construction and operation of the Project in accordance with the requirements of the...\\ launchers and receivers; and \\3\\ A pig is an internal tool that can be used to clean and dry a pipeline and...

  10. Supercritical fluid extraction-capillary gas chromatography: on-line coupling with a programmed temperature vaporizer

    NARCIS (Netherlands)

    Houben, R.J.; Janssen, J.G.M.; Leclercq, P.A.; Rijks, J.A.; Cramers, C.A.M.G.

    1990-01-01

    A simple and versatile system is described for the on-line coupling of SFE to capillary GC. The interfacing consists of a programmed temperature vaporizer (PTV) injector. With this injector it is possible to combine solute trapping, elimination of a high flow of extraction fluid, and quantitative

  11. The Genomes OnLine Database (GOLD) v.4: status of genomic and metagenomic projects and their associated metadata

    Science.gov (United States)

    Pagani, Ioanna; Liolios, Konstantinos; Jansson, Jakob; Chen, I-Min A.; Smirnova, Tatyana; Nosrat, Bahador; Markowitz, Victor M.; Kyrpides, Nikos C.

    2012-01-01

    The Genomes OnLine Database (GOLD, http://www.genomesonline.org/) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2011, GOLD, now on version 4.0, contains information for 11 472 sequencing projects, of which 2907 have been completed and their sequence data has been deposited in a public repository. Out of these complete projects, 1918 are finished and 989 are permanent drafts. Moreover, GOLD contains information for 340 metagenome studies associated with 1927 metagenome samples. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about any (x) Sequence specification and beyond. PMID:22135293

  12. The Asian Development Bank's past and future involvement in financing gas projects in developing member countries of the Bank

    International Nuclear Information System (INIS)

    Chua, S.B.

    1991-01-01

    This paper presents a review of the Bank's involvement in financing gas projects in its developing member countries (DMC's). The paper highlights the scope of the Bank's past activities in the sector, the DMC's which had received assistance from the Bank, the types of projects financed by the Bank, the benefits expected to be derived from the projects, and the past problems encountered by the Bank. The operational framework under which past Bank lending to the gas sector was conducted is also described. The prospects of natural gas playing a prominent role as an environmentally preferred energy source to oil and coal are outlined. Indications of the direction of the Bank's future efforts to help its gas-resource-rich as well as its gas-resource-poor DMC's to quicken the use of natural gas are given. While emphasizing the Bank's contributions in helping its DMC's to increase gas supply to alleviate energy shortages, the paper stresses the important role the Bank has played and will play in institution-building and sector-development work. The paper explores the possibility for the Bank to expand its operations in the gas sector which will lead to the efficient and accelerated development of a clean energy source that will help its DMC's avoid a third oil crisis and reduce the damaging build-up of a greenhouse gas which now threatens to harm the global environment

  13. The tightness of the globe valves in the exploitations practice of the gas pipe-lines

    International Nuclear Information System (INIS)

    Pietrak, T.; Rudzki, Z.; Surmacz, W.

    2006-01-01

    Technological units of the Transit Gas Pipeline (i.e. Compressor Stations, Valve Stations, Stations or National Network Service Installations) have been fitted with Ball Valves as shut-off devices (block valves). Internal tightness of the valves' seat becomes major factor in securing proper service conditions during normal pipeline operation as well as for isolating of pipeline sections in emergency situations (loss of pipeline integrity or uncontrolled gas escape). Internal tightness of the valves is being inspected during scheduled maintenance of the pipeline units. Any leak revealed during inspection is being repaired, following instructions provided in the Manufacturer's Valve Manual. After a time, some cases have been identified, when repair of the revealed leak was found to be difficult, despite close following of the repair manuals. The paper presents analysis of the issue and corrective actions taken accordingly. (authors)

  14. Pressure disequilibria induced by rapid valve closure in noble gas extraction lines

    Science.gov (United States)

    Morgan, Leah; Davidheiser-Kroll, Brett

    2015-01-01

    Pressure disequilibria during rapid valve closures can affect calculated molar quantities for a range of gas abundance measurements (e.g., K-Ar geochronology, (U-Th)/He geochronology, noble gas cosmogenic chronology). Modeling indicates this effect in a system with a 10 L reservoir reaches a bias of 1% before 1000 pipette aliquants have been removed from the system, and a bias of 10% before 10,000 aliquants. Herein we explore the causes and effects of this problem, which is the result of volume changes during valve closure. We also present a solution in the form of an electropneumatic pressure regulator that can precisely control valve motion. This solution reduces the effect to ∼0.3% even after 10,000 aliquants have been removed from a 10 L reservoir.

  15. Pressure disequilibria induced by rapid valve closure in noble gas extraction lines

    Science.gov (United States)

    Morgan, Leah E.; Davidheiser-Kroll, Brett

    2015-06-01

    Pressure disequilibria during rapid valve closures can affect calculated molar quantities for a range of gas abundance measurements (e.g., K-Ar geochronology, (U-Th)/He geochronology, noble gas cosmogenic chronology). Modeling indicates this effect in a system with a 10 L reservoir reaches a bias of 1% before 1000 pipette aliquants have been removed from the system, and a bias of 10% before 10,000 aliquants. Herein we explore the causes and effects of this problem, which is the result of volume changes during valve closure. We also present a solution in the form of an electropneumatic pressure regulator that can precisely control valve motion. This solution reduces the effect to ˜0.3% even after 10,000 aliquants have been removed from a 10 L reservoir.

  16. Development of a time projection chamber using gas electron multipliers (GEM-TPC)

    International Nuclear Information System (INIS)

    Oda, S.X.; Hamagaki, H.; Ozawa, K.; Inuzuka, M.; Sakaguchi, T.; Isobe, T.; Gunji, T.; Morino, Y.; Saito, S.; Yamaguchi, Y.L.; Sawada, S.; Yokkaichi, S.

    2006-01-01

    We developed a prototype time projection chamber using gas electron multipliers (GEM-TPC) for high energy heavy ion collision experiments. To investigate its performance, we conducted a beam test with three kinds of gases (Ar(90%)-CH 4 (10%), Ar(70%)-C 2 H 6 (30%) and CF 4 ). Detection efficiency of 99%, and spatial resolution of 79μm in the pad-row direction and 313μm in the drift direction were achieved. The test results show that the GEM-TPC meets the requirements for high energy heavy ion collision experiments. The configuration and performance of the GEM-TPC are described

  17. Development of a Time Projection Chamber using CF4 gas for relativistic heavy ion experiments

    International Nuclear Information System (INIS)

    Isobe, T.; Hamagaki, H.; Ozawa, K.; Inuzuka, M.; Sakaguchi, T.; Matsumoto, T.; Kametani, S.; Kajihara, F.; Gunji, T.; Kurihara, N.; Oda, S.X.; Yamaguchi, Y.L.

    2006-01-01

    A prototype Time Projection Chamber (TPC) using pure CF 4 gas was developed for possible use in heavy ion experiments. Basic characteristics such as gain, drift velocity, longitudinal diffusion and attenuation length of produced electrons were measured with the TPC. At an electric field of 900V/cm, the drift velocity and longitudinal diffusion for 1cm drift were obtained as 10cm/μs and 60μm, respectively. The relatively large gain fluctuation is explained to be due to the electron attachment process in CF 4 . These characteristics are encouraging for the measurement of the charged particle trajectories under high multiplicity conditions at RHIC

  18. Qinshan phase II extension nuclear power project thermal stratification and fatigue stress analysis for pressurizer surge line

    International Nuclear Information System (INIS)

    Yu Xiaofei; Zhang Yixiong; Ai Honglei

    2010-01-01

    Thermal stratification of pressurizer surge line induced by the inside fluid brings on global bending moments, local thermal stresses, unexpected displacements and support loadings of the pipe system. In order to avoid a costly three-dimensional computation, a combined 1D/2D technique has been developed and implemented to analyze the thermal stratification and fatigue stress of pressurize surge line of QINSHAN Phase II Extension Nuclear Power Project in this paper, using the computer codes SYSTUS and ROCOCO. According to the mechanical analysis results of stratification, the maximum stress and cumulative usage factor, the loadings at connections of surge line to main pipe and RCP and the displacements of surge line at supports are obtained. (authors)

  19. Multi Parameter Flow Meter for On-Line Measurement of Gas Mixture Composition

    Directory of Open Access Journals (Sweden)

    Egbert van der Wouden

    2015-04-01

    Full Text Available In this paper we describe the development of a system and model to analyze the composition of gas mixtures up to four components. The system consists of a Coriolis mass flow sensor, density, pressure and thermal flow sensor. With this system it is possible to measure the viscosity, density, heat capacity and flow rate of the medium. In a next step the composition can be analyzed if the constituents of the mixture are known. This makes the approach universally applicable to all gasses as long as the number of components does not exceed the number of measured properties and as long as the properties are measured with a sufficient accuracy. We present measurements with binary and ternary gas mixtures, on compositions that range over an order of magnitude in value for the physical properties. Two platforms for analyses are presented. The first platform consists of sensors realized with MEMS fabrication technology. This approach allows for a system with a high level of integration. With this system we demonstrate a proof of principle for the analyses of binary mixtures with an accuracy of 10%. In the second platform we utilize more mature steel sensor technology to demonstrate the potential of this approach. We show that with this technique, binary mixtures can be measured within 1% and ternary gas mixtures within 3%.

  20. On-line gas chromatographic studies of rutherfordium (Element 104), hahnium (Element 105), and homologs

    International Nuclear Information System (INIS)

    Kadkhodayan, B.

    1993-05-01

    Gas-phase isothermal chromatogaphy is a method by which volatile compounds of different chemical elements can be separated according to their volatilities. The technique, coupled with theoretical modeling of the processes occurring in the chromatogaphy column, provides accurate determination of thermodynamic properties (e.g., adsorption enthalpies) for compounds of elements, such as the transactinides, which can only be produced on an atom-at-a-time basis. In addition, the chemical selectivity of the isothermal chromatogaphy technique provides the decontamination from interfering activities necessary for the determination of the nuclear decay properties of isotopes of the transactinide elements. Volatility measurements were performed on chloride species of Rf and its group 4 homologs, Zr and Hf, as well as Ha and its group 5 homologs, Nb and Ta. Adsorption enthalpies were calculated for all species using a Monte Carlo code simulation based on a microscopic model for gas thermochromatography in open columns with laminar flow of the carrier gas. Preliminary results are presented for Zr- and Nb-bromides

  1. Where in the World are Canadian Oil and Gas Companies? An Introduction to the Project

    Directory of Open Access Journals (Sweden)

    Niloo Hojjati

    2017-06-01

    Full Text Available In April 2013, The School of Public Policy formally launched the Extractive Resource Governance Program, a platform to harness Canadian and international research and technical expertise to assist resource-rich jurisdictions in establishing sustainable and mutually beneficial policies for governance of the extractive sector. The program delivers applied policy research, technical assistance and executive training programs to countries with emerging or established extractive resources, working in collaboration with governments, regulatory bodies, academia, civil society, and industry. Begun in 2011 as an internal research tool for the development of the Extractive Resource Governance Program, this project was conceived as a means to identify jurisdictions where Canadian companies had ongoing projects and activities around the world. This paper introduces the methodology used to answer the question: Where in the world are Canadian oil and gas companies? To answer this question, firm-level data from publicly traded Canadian companies were collected and analyzed culminating in the development of an online tool for public use. This paper accompanies an interactive website launched by The School’s Extractive Resource Governance Program and describes the data available online as well as in the annual reports released by The school. The website and annual reports allow interested users to geographically locate jurisdictions around the world where publicly traded Canadian oil and gas companies have activities, over time. The website is available at http://www.policyschool.ca/research-teaching/teachingtraining/extractive-resource-governance/ergp-map/. While Canada is a well-recognized oil and gas jurisdiction within its own borders, the extent of activity that Canadian companies undertake in the international arena is less well known. For instance, while Natural Resources Canada collects and publishes regular data on Canadian mining assets and

  2. Systematization of by-product plant. (1) Development of on-line analyzers for treatment of gas liquor

    Energy Technology Data Exchange (ETDEWEB)

    Matsumura, Susumu; Taketomi, Hirofumi; Ohashi, Shigeru [Nippon Kokan K.K., Tokyo (Japan)

    1988-04-07

    As a part of systematization of absorption and refinery processing installation for coke oven gas, on-line analyzers for gas liquor treatment with activated sludge were developed and established. A T-NH{sub 3} analyzer using a potential difference titration method was equipped to control NH{sub 3} which had a bad influence upon activated sludge. The oxygen intake rate is measured with an activity measuring instrument in order to get the activity condition of bacteria. The SCN concentration of precipitator outlet solution is measured with an SCN(thiocyanogen) measuring instrument so that conditions of bacteria can be seized. An absorptiometry with ferric chloride is used to analyze it. For a COD measuring instrument, precipitator outlet solution is used and analysis with the JIS method is entirely automated. As a transparency measuring instrument, a color-difference colorimeter is used instead of the former instrument made of glass. According to the collected data, charged coal conditions, and operating conditions of coke oven, the process computer does the calculation for optimization and indicates operation control guidances to the operator. Automated on -line analyzers are useful to save a great deal of labor and contribute to the control and stabilization of operations. 9 figs., 1 tab.

  3. Draft environmental statement related to the Union Carbide Corporation, Gas Hills Uranium Project (Natrona County, Wyoming)

    International Nuclear Information System (INIS)

    1979-01-01

    The proposed action is the renewal of Source Material License SUA-648 issued for the operation of the Gas Hills Uranium Project in Wyoming, near Moneta. The project is an acid leach, ion-exchange, and solvent-extraction uranium ore processing mill at an increased capacity of 500,000 tons per year and the construction of two heap leach facilities in Natrona and Fremont Counties for initial processing of low-grade ore. After analysis of environmental impacts and adverse effects, it is the proposed position of NRC that the license be renewed subject to conditions relating to stabilization of the tailings, reclamation, environmental monitoring, evaluation of any future activity not evaluated by NRC, archeological survey, analysis of unexpected harmful effects, and decommissioning

  4. Risks in the transport and storage of liquefied natural gas. Sub-project 5-2: Investigation into building damage

    Science.gov (United States)

    Gouwens, C.; Dragosavic, M.

    The large reserves and increasing use of natural gas as a source of energy have resulted in its storage and transport becoming an urgent problem. Since a liquid of the same mass occupies only a fraction of the volume of a gas, it is economical to store natural gas as a liquid. Liquefied natural gas is stored in insulated tanks and also carried by ship at a temperature of -160 C to 170 C. If a serious accident allows the LNG to escape, a gas cloud forms. The results of a possible explosion from such a gas cloud are studied. The development of a leak, escape and evaporation, size and propagation of the gas cloud, the explosive pressures to be expected and the results on the environment are investigated. Damage to buildings is examined making use of the preliminary conclusions of the other sub-projects and especially the explosive pressures.

  5. Environmental assessment and finding of no significant impact: Hungry Horse--Columbia Falls line rebuild and relocation project

    International Nuclear Information System (INIS)

    1993-09-01

    Bonneville Power Administration (BPA) has identified a need to rebuild the Hungry Horse-Columbia Falls 115,000-volt (115-kV) transmission line to 230-kV. This line supplies power to customers in the area of Columbia Falls, Montana, and integrates generation at the US Bureau of Reclamation's (USBR) Hungry Horse Dam into BPA's transmission grid. There are several problems with the existing system. The Hungry Horse-Columbia Falls 1 15-kV line is 45 years old and requires excessive maintenance. The USBR has decided to replace their aging 115-kV transformers at the dam with 230-kV transformers, which also would increase their operational flexibility. With the small conductor size and voltage of the line presently being used, significant amounts of energy are lost as the power moves across the line. Transformer failure at Hungry Horse Dam has led to joint planning between BPA and the USBR. (USBR and the US Forest Service are cooperating agencies on the proposed project.) The proposal to eliminate the 115-kV equipment and convert to 230-kV operation was the least costly of the options studied. By rebuilding the line, maintenance costs (and time required for outages) would be reduced. The increased generation at the USBR dam would be safely and consistently transmitted over the improved system, and less energy would be lost from the line, a cost and energy savings

  6. Assessing and Projecting Greenhouse Gas Release due to Abrupt Permafrost Degradation

    Science.gov (United States)

    Saito, K.; Ohno, H.; Yokohata, T.; Iwahana, G.; Machiya, H.

    2017-12-01

    Permafrost is a large reservoir of frozen soil organic carbon (SOC; about half of all the terrestrial storage). Therefore, its degradation (i.e., thawing) under global warming may lead to a substantial amount of additional greenhouse gas (GHG) release. However, understanding of the processes, geographical distribution of such hazards, and implementation of the relevant processes in the advanced climate models are insufficient yet so that variations in permafrost remains one of the large source of uncertainty in climatic and biogeochemical assessment and projections. Thermokarst, induced by melting of ground ice in ice-rich permafrost, leads to dynamic surface subsidence up to 60 m, which further affects local and regional societies and eco-systems in the Arctic. It can also accelerate a large-scale warming process through a positive feedback between released GHGs (especially methane), atmospheric warming and permafrost degradation. This three-year research project (2-1605, Environment Research and Technology Development Fund of the Ministry of the Environment, Japan) aims to assess and project the impacts of GHG release through dynamic permafrost degradation through in-situ and remote (e.g., satellite and airborn) observations, lab analysis of sampled ice and soil cores, and numerical modeling, by demonstrating the vulnerability distribution and relative impacts between large-scale degradation and such dynamic degradation. Our preliminary laboratory analysis of ice and soil cores sampled in 2016 at the Alaskan and Siberian sites largely underlain by ice-rich permafrost, shows that, although gas volumes trapped in unit mass are more or less homogenous among sites both for ice and soil cores, large variations are found in the methane concentration in the trapped gases, ranging from a few ppm (similar to that of the atmosphere) to hundreds of thousands ppm We will also present our numerical approach to evaluate relative impacts of GHGs released through dynamic

  7. Gas expanders at M/R Stations in the natural gas distribution network. Pre-project, subreport; Gasexpandere paa distributionsnettets M/R-stationer. Forprojekt, delrapport

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, Niels Bjarne

    2010-05-15

    Danish Gas Technology Centre has been carrying out a feasibility project to clarify the possibilities of installing gas expanders at M/R-stations (Measuring and Regulating) in the Distribution system of the natural gas grid. A large number of such expanders are installed around the world. The novelty of this project is to use a heat pump to perform the necessary heating of the gas before the expander, and to ''export'' to the electricity grid the remaining electricity from the generator connected to the expander. The present project includes the small M/R-stations at the gas Distribution grid where pressure is reduced from 40 or 20 bar to 4 bar. The preliminary project (year 1 of project) has investigated whether components for such smaller systems can be found, and it has investigated prices for different quantities. A technical feasibility study has been done. Also, preliminary calculations of payback times has been carried out. A large potential of CO{sub 2}-reduction is present with this technology based on saving of natural gas combustion and on new electricity production displacing existing production without any use of primary energy. The main results and conclusions are: 1) There are component suppliers for expander systems suitable to the size of distribution network M/R stations. 2) Pressure regulators provided at the stations are laid out with significant overcapacity, enabling a simplified installation of the expander systems. 3) If the system is being rolled out across the Danish distribution grid, the realistic saving potential is approx. 2.3 million Nm3 of gas per year and a production of almost 40 million kWh of electricity. 4) If the price is 0.60 DKK/kWh for electricity sold, the simple pay-back is 6-7 years on average, covering a variation from 3 to 16 years at the various stations. The smallest stations are omitted. The best stations covering more than half of the gas flow have a pay-back time between 3 and 6 years. 5) The

  8. Study for reactive power on distribution system line B RSG-GAS

    International Nuclear Information System (INIS)

    Yan Bony Marsahala

    2010-01-01

    Study for reactive power on distribution system line B RSG-GA is already done. The study intended to evaluate how much inductive load need the reactive power (positive), how much power factor, and what will be done to increase the power factor. The reactive power is the losses power, can't be changed into energy, but it is need for transmission process and it is cause the energy losses. The loads on distribution system line B consist of induction motors which are used for primary cooling system and secondary cooling system, lift, blower on cooling tower, and air condition system. Due to the motors using, the power factor are falling down to low. By the calculation results give that the inductive loads on distribution line B are 850 KVA and these loads caused the low power factor 0.80. If we want to increase the power factor up to 0.95, it is need to install the reactive loads likes capacitor bank 250 KVAR. (author)

  9. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    Energy Technology Data Exchange (ETDEWEB)

    Fenham, J. [Risoe National Lab., Roskilde (Denmark)

    2003-07-01

    solvent use and other sources is included as a souce of CO{sub 2} emission. A separate chapter is dedicated to each of these sectors. However, the report starts with a summary of the emissions with a section for each of the pollutants treated. At the end of each of these section the main differences between the present calculation and thevalues in Denmark's Second National Communication on Climate Change are described shortly. For each of the pollutants the development of the emissions in the period 1972-2012 and the various emission targets in Danish sector plants or international conventions are shown on a figure. Below the figures the emissions for the main emitting sectors are shown in a table. The years shown in these tables are not the same for all pollutants. When a column is marked with '2010' it means that the values in the columns are averaged over the first commitment period 2008-2012. It is not possible in this report to present all the data from the emission calculations. The data is contained in an EXEL notebook model. Appendix 1 contains a table with time-series for 1975-2012 for the greenhouse gases CO{sub 2}, CH{sub 4} and N{sub 2}O for all emitting sectors. In Appendix 2 the results of the projections 2000-2012 are shown in the IPCC/CRF Sectoral Tables format in CO{sub 2} equivalents for each greenhouse gas and in total (only source and sink categories with greenhouse gas emissions or removals are shown). The model is structured as a set of worksheets for the primary energy consuming sector and the model contains similar sets for each of the pollutants. Additional sheets have been included for the relevant pollutants, where emissions originate from non-combustion processes. Each of these spreadsheets contains time-series for the emissions from each of the primary fuels consumed in the sector. (ba)

  10. Resonant line transfer in a fog: using Lyman-alpha to probe tiny structures in atomic gas

    Science.gov (United States)

    Gronke, Max; Dijkstra, Mark; McCourt, Michael; Peng Oh, S.

    2017-11-01

    Motivated by observational and theoretical work that suggest very small-scale (≲ 1 pc) structure in the circumgalactic medium of galaxies and in other environments, we study Lyman-α (Lyα) radiative transfer in an extremely clumpy medium with many clouds of neutral gas along the line of sight. While previous studies have typically considered radiative transfer through sightlines intercepting ≲ 10 clumps, we explored the limit of a very large number of clumps per sightline (up to fc 1000). Our main finding is that, for covering factors greater than some critical threshold, a multiphase medium behaves similarly to a homogeneous medium in terms of the emergent Lyα spectrum. The value of this threshold depends on both the clump column density and the movement of the clumps. We estimated this threshold analytically and compare our findings to radiative transfer simulations with a range of covering factors, clump column densities, radii, and motions. Our results suggest that (I) the success in fitting observed Lyα spectra using homogeneous "shell models" (and the corresponding failure of multiphase models) hints at the presence of very small-scale structure in neutral gas, which is in agreement within a number of other observations; and (II) the recurrent problems of reproducing realistic line profiles from hydrodynamical simulations may be due to their inability to resolve small-scale structure, which causes simulations to underestimate the effective covering factor of neutral gas clouds. The movie associated to Fig. B.2 is available at http://www.aanda.org

  11. Innovative in-line separators: removal of water or sand in oil/water and gas/liquid/solid pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Jepson, Paul; Cheolho Kang; Gopal, Madan [CC Technologies, Dublin, OH (United States)

    2003-07-01

    In oil and gas production, multiphase mixtures are often separated before downstream processing. The separators are large, often 20 - 40 feet long and large diameter and use sophisticated internals. The costs are in the millions of dollars. Further, the sand and water in the flow can cause severe internal erosion and corrosion respectively before the flow reaches the separators. The CC Technologies/MIST In line Separation System is a cost-effective, efficient device for use in multiphase environments. The device is applicable for gas/solid, gas/liquid/solid and oil/water systems and offers exceptional separation between phases for a fraction of the cost of expensive gravity separators and hydro cyclones. The System contains no moving parts and is designed to be of the same diameter as the pipe, and experiences low shear forces. It can be fabricated with standard pipes. The efficiency of the separator has been determined in an industrial scale, pilot plant test facility at CC Technologies in 4-inch diameter pipes and has been found to be in excess of 98-99% for the removal of sand. Two phase oil/water separation effectiveness is in excess of 90% in 1-stage and 95% in 2 - stage. (author)

  12. Using the Pairs of Lines Broadened by Collisions with Neutral and Charged Particles for Gas Temperature Determination of Argon Non-Thermal Plasmas at Atmospheric Pressure

    Directory of Open Access Journals (Sweden)

    Cristina Yubero

    2017-10-01

    Full Text Available The spectroscopic method for gas temperature determination in argon non-thermal plasmas sustained at atmospheric pressure proposed recently by Spectrochimica Acta Part B 129 14 (2017—based on collisional broadening measurements of selected pairs of argon atomic lines, has been applied to other pairs of argon atomic lines, and the discrepancies found in some of these results have been analyzed. For validation purposes, the values of the gas temperature obtained using the different pairs of lines have been compared with the rotational temperatures derived from the OH ro-vibrational bands, using the Boltzmann-plot technique.

  13. On-line gamma spectroscopy measuring station for cover gas monitoring at KNK II

    International Nuclear Information System (INIS)

    Hoffmann, G.; Letz, K.D.

    1980-02-01

    An automated Ge-γ-spectrometer was developed for cover gas monitoring at KNK II which, by the gamma spectra measured, is to allow the following statements to be made on fuel cladding failure: Type, size, variation with time and subsequent development of the failure. In this report the hardware and software will be explained. Besides, an instruction manual was written for the measuring station, which allows to operate it without detailed knowledge of the manuals for the individual hardware components. (orig.) 891 HP/orig. 892 MKO [de

  14. HB-Line Special Nuclear Material Campaigns: Model-Based Project Management

    International Nuclear Information System (INIS)

    CHANG, ROBERT

    2004-01-01

    This study is to show how a model was used to enable management to better estimate production capabilities to ensure contract milestones/commitments are met, to cope with fast changing project baselines and project missions, to ensure the project will meet the negotiated throughput, and to eliminate unnecessary but costly design changes

  15. Battery-Powered Electric and Hybrid Electric Vehicle Projects to Reduce Greenhouse Gas Emissions: A Resource for Project Development

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2002-07-31

    The transportation sector accounts for a large and growing share of global greenhouse gas (GHG) emissions. Worldwide, motor vehicles emit well over 900 million metric tons of carbon dioxide (CO2) each year, accounting for more than 15 percent of global fossil fuel-derived CO2 emissions.1 In the industrialized world alone, 20-25 percent of GHG emissions come from the transportation sector. The share of transport-related emissions is growing rapidly due to the continued increase in transportation activity.2 In 1950, there were only 70 million cars, trucks, and buses on the world’s roads. By 1994, there were about nine times that number, or 630 million vehicles. Since the early 1970s, the global fleet has been growing at a rate of 16 million vehicles per year. This expansion has been accompanied by a similar growth in fuel consumption.3 If this kind of linear growth continues, by the year 2025 there will be well over one billion vehicles on the world’s roads.4 In a response to the significant growth in transportation-related GHG emissions, governments and policy makers worldwide are considering methods to reverse this trend. However, due to the particular make-up of the transportation sector, regulating and reducing emissions from this sector poses a significant challenge. Unlike stationary fuel combustion, transportation-related emissions come from dispersed sources. Only a few point-source emitters, such as oil/natural gas wells, refineries, or compressor stations, contribute to emissions from the transportation sector. The majority of transport-related emissions come from the millions of vehicles traveling the world’s roads. As a result, successful GHG mitigation policies must find ways to target all of these small, non-point source emitters, either through regulatory means or through various incentive programs. To increase their effectiveness, policies to control emissions from the transportation sector often utilize indirect means to reduce emissions, such

  16. Gas Transport and Density Control in the HYLIFE Heavy-Ion Beam Lines

    International Nuclear Information System (INIS)

    Debonnel, Christophe S.; Welch, Dale R.; Rose, David V.; Lawrence, Simon S.Yu; Peterson, Per F.

    2003-01-01

    The effective propagation and focusing of heavy-ion beams in the final-focus magnet region of inertial fusion target chambers require controlling the background gas density and pressure in the beam tubes. Liquid vortexes will coat the inside of the tubes next to the beam ports and will help eliminate the need for mechanical shutters to mitigate the venting of target chamber background gas into the final-focus magnet region. Before the neutralizing region, the beam space charge is high, and ablation and target debris deposition in the final-focus magnet region may cause voltage breakdown. Previous studies focused on evaluating the amount of target chamber debris reaching the entrance of the beam ports. The TSUNAMI code has now been used to assess the density, temperature, and velocity of the vortex debris transported ∼3 m up the beam tubes and reaching the final-focus magnet region, assuming that the liquid vortexes are perfectly absorbing surfaces. To further mitigate debris deposition in the final-focus magnet region, and prevent voltage breakdown, a 'magnetic shutter' has been envisaged to divert the debris out of the final-focus region. This shutter will prevent the hot ablation debris from reaching the magnet region and, coupled to some ionizing scheme, will conveniently suppress early ingression of debris into the final-focus magnet region

  17. Delivering below the line in project management – A conceptual exploration

    Directory of Open Access Journals (Sweden)

    Udechukwu Ojiako

    2013-06-01

    Design/Methodology/Approach: The study is conceptual in nature and draws upon literature on complexity theory, expectations theories and stakeholder theory. Findings: The paper finds that there is a need to articulate a different assessment of project outcomes than has been traditionally undertaken. Such assessments may emphasise the perceptions of project clients formed through their experience of projects throughout the project lifecycle. Implications: This paper raises questions on whether the outcomes of projects are best ‘measured’ or ‘assessed’.

  18. Long-term trends in U.S. gas supply and prices: 1991 edition of the GRI baseline projection of U.S. energy supply and demand to 2010, April 1991. Gas research insights

    International Nuclear Information System (INIS)

    Woods, T.J.

    1991-04-01

    The report summarizes the gas supply and price outlook in the 1991 Edition of the GRI Baseline Projection of U.S. Energy Supply and Demand. Projected U.S. gas production, gas imports, and other sources of gas supply are discussed along with the sensitivity of the outlook to changes in price expectations. The critical uncertainties and issues affecting the gas supply and price outlook are discussed. Appendixes include a comparison of the 1991 and the 1989 projections of gas supply and price trends; and a description of the GRI Hydrocarbon Model

  19. Propagation of the initial value perturbation in a cylindrical lined duct carrying a gas flow

    Directory of Open Access Journals (Sweden)

    Agneta M. BALINT

    2013-03-01

    Full Text Available For the homogeneous Euler equation linearized around a non-slipping mean flow andboundary conditions corresponding to the mass-spring-damper impedance, smooth initial dataperturbations with compact support are considered. The propagation of this type of initial dataperturbations in a straight cylindrical lined duct is investigated. Such kind of investigations is missingin the existing literature. The mathematical tools are the Fourier transform with respect to the axialspatial variable and the Laplace transform with respect to the time variable. The functionalframework and sufficient conditions are researched that the so problem be well-posed in the sense ofHadamard and the Briggs-Bers stability criteria can be applied.

  20. The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata

    Science.gov (United States)

    Liolios, Konstantinos; Chen, I-Min A.; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Philip; Markowitz, Victor M.; Kyrpides, Nikos C.

    2010-01-01

    The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification. GOLD is available at: http://www.genomesonline.org and has a mirror site at the Institute of Molecular Biology and Biotechnology, Crete, Greece, at: http://gold.imbb.forth.gr/ PMID:19914934

  1. Structural assessment procedure of corroding submarine gas pipelines using on-line inspection data

    International Nuclear Information System (INIS)

    Nordin Yahaya

    2000-01-01

    This paper presents 'the alternative approach of overall procedure in the assessment of corroded pipelines using data gathered by the on-line inspection device. The methodology adopts a generalised approach of analysing pipeline inspection data and a prediction of the structural reliability due to the deteriorating corrosion environment. The whole assessment methodology is divided into four separate stages; 1 to IV. Stages 1 and 11 are the initial procedure prior to the actual analysis of the inspection data. The scope of this paper is concerted into the procedure to be taken in Stage 111 where the stage is sub-divided into 3 major steps; Part A, B and C. These procedures are Part A (statistical and probabilistic analysis of the inspection data) and Part B (the application of extreme value statistics) and C (reliability assessment). Stage IV (risk assessment) is the final step in the procedure where the consequences of failure are evaluated. The proposed risk-based assessment procedure is more systematic and reliable to account for a huge amount of collected data usually obtained in an on-line inspection using the intelligent devices. The outcomes of this risk-based methodology can be very useful in the decision-making process by the operation management. This in turn will produce an efficient inspection, repair and maintenance program and enhanced the optimised return in investment. (author)

  2. Economic evaluation on tight sandstone gas development projects in China and recommendation on fiscal and taxation support policies

    Directory of Open Access Journals (Sweden)

    Zhen Yang

    2016-11-01

    Full Text Available China is rich in tight sandstone gas resources (“tight gas” for short. For example, the Sulige Gasfield in the Ordos Basin and the Upper Triassic Xujiahe Fm gas reservoir in the Sichuan Basin are typical tight gas reservoirs. In the past decade, tight gas reserve and production both have increased rapidly in China, but tight gas reservoirs are always managed as conventional gas reservoirs without effective fiscal, taxation and policy supports. The potential of sustainable tight gas production increase is obviously restricted. The tight gas development projects represented by the Sulige Gasfield have failed to make profit for a long period, and especially tight gas production has presented a slight decline since 2015. In this paper, a new economic evaluation method was proposed for tight gas development projects. The new method was designed to verify the key parameters (e.g. production decline rate and single-well economic service life depending on tight gas development and production characteristics, and perform the depreciation by using the production method. Furthermore, the possibility that the operation cost may rise due to pressure-boosting production and intermittent opening of gas wells is considered. The method was used for the tight gas development project of Sulige Gasfield, showing that its profit level is much lower than the enterprise's cost level of capital. In order to support a sustainable development of tight gas industry in China, it is recommended that relevant authorities issue value-added tax (VAT refund policy as soon as possible. It is necessary to restore the non-resident gas gate price of the provinces where tight gas is produced to the fair and reasonable level in addition to the fiscal subsidy of CNY0.24/m3, or offer the fiscal subsidy of CNY0.32/m3 directly based on the on-going gate price. With these support policies, tax income is expected to rise directly, fiscal expenditure will not increase, and gas

  3. A multiphase flow meter for the on-line determination of the flow rates of oil, water and gas

    International Nuclear Information System (INIS)

    Roach, G.J.; Watt, J.S.

    1997-01-01

    Multiphase mixtures of crude oil, formation water and gas are carried in pipelines from oil wells to production facilities. Multiphase flow meters (MFMs) are being developed to determine the flow rates of each component of the heterogeneous mixture in the pipeline. CSIRO Minerals has developed and field tested a gamma-ray MFM for the on-line determination of the flow rates of heterogeneous mixtures of oil, water and gas in pipelines. It consists of two specialised gamma-ray transmission gauges, and pressure and temperature sensors, mounted on the pipeline carrying the full flow of the production stream. The MFM separately measures liquids and gas flow rates, and the volume ratio of water and liquids (water cut). The MFM has been trialled at three offshore production facilities in Australia. In each, the MFM was mounted on the pipeline between the test manifold and the test separator. The multiphase streams from the various wells feeding to the platform were sequentially routed past the MFM. The MFM and test separator outputs were compared using regression analysis. The flow rates of oil, water and gas were each determined to relative errors in the range of 5-10% . The MFM has been in routine use on the West Kingfish platform in the Bass Strait since November 1994. The MFM was recently tested over a wide range of flow conditions at a Texaco flow facility near Houston. Water cut, based on pre-trial calibration, was determined to 2% rms over the range 0-100% water cut. The liquids and gas flow results were interpreted based on slip correlations obtained from comparison of the MFM and Texaco flows. Using these, the relative errors were respectively 6.6% for liquid flow, 6.2% for gas, 8% for oil and 8% for water. The MFM is licensed to Kvaerner FSSL of Aberdeen. Kvaerner will supply the gamma-ray MFM for both platform and subsea use. Technology transfer commenced in December 1996, and Kvaerner completed the manufacture of the first MFM in August 1997

  4. Greenhouse Emission Reductions and Natural Gas Vehicles: A Resource Guide on Technology Options and Project Development

    Energy Technology Data Exchange (ETDEWEB)

    Orestes Anastasia; NAncy Checklick; Vivianne Couts; Julie Doherty; Jette Findsen; Laura Gehlin; Josh Radoff

    2002-09-01

    Accurate and verifiable emission reductions are a function of the degree of transparency and stringency of the protocols employed in documenting project- or program-associated emissions reductions. The purpose of this guide is to provide a background for law and policy makers, urban planners, and project developers working with the many Greenhouse Gas (GHG) emission reduction programs throughout the world to quantify and/or evaluate the GHG impacts of Natural Gas Vehicle (NGVs). In order to evaluate the GHG benefits and/or penalties of NGV projects, it is necessary to first gain a fundamental understanding of the technology employed and the operating characteristics of these vehicles, especially with regard to the manner in which they compare to similar conventional gasoline or diesel vehicles. Therefore, the first two sections of this paper explain the basic technology and functionality of NGVs, but focus on evaluating the models that are currently on the market with their similar conventional counterparts, including characteristics such as cost, performance, efficiency, environmental attributes, and range. Since the increased use of NGVs, along with Alternative Fuel Vehicle (AFVs) in general, represents a public good with many social benefits at the local, national, and global levels, NGVs often receive significant attention in the form of legislative and programmatic support. Some states mandate the use of NGVs, while others provide financial incentives to promote their procurement and use. Furthermore, Federal legislation in the form of tax incentives or procurement requirements can have a significant impact on the NGV market. In order to implement effective legislation or programs, it is vital to have an understanding of the different programs and activities that already exist so that a new project focusing on GHG emission reduction can successfully interact with and build on the experience and lessons learned of those that preceded it. Finally, most programs

  5. On-line fast response device and method for measuring dissolved gas in a fluid

    Science.gov (United States)

    Tutu, Narinder Kumar [Manorville, NY

    2011-01-11

    A method and device for the measurement of dissolved gas within a fluid. The fluid, substantially a liquid, is pumped into a pipe. The flow of the fluid is temporally restricted, creating one or more low pressure regions. A measurement indicative of trapped air is taken before and after the restriction. The amount of dissolved air is calculated from the difference between the first and second measurements. Preferably measurements indicative of trapped air is obtained from one or more pressure transducers, capacitance transducers, or combinations thereof. In the alternative, other methods such as those utilizing x-rays or gamma rays may also be used to detect trapped air. Preferably, the fluid is a hydraulic fluid, whereby dissolved air in the fluid is detected.

  6. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    1991-06-01

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  7. Gas hydrates and clathrates. Flow assurance, environmental and economic perspectives and the Nigerian liquefied natural gas project

    International Nuclear Information System (INIS)

    Gbaruko, B.C.; Igwe, J.C.; Nwokeoma, R.C.; Gbaruko, P.N.

    2007-01-01

    Gas hydrates are nonstoichiometric crystalline compounds that belong to the inclusion group known as clathrates. They occur when water molecules attach themselves together through hydrogen bonding and form cavities which can be occupied by a single gas or volatile liquid molecule. Gas hydrates, asphaltenes and waxes are three major threats to flow assurance that must be well assessed by design team uptime. Gas hydrates are also looked upon as a future energy source and as a potential climate hazard. The purpose of this review is to show the chemistry and mechanism of gas hydrate formation, the problems they pose, especially to flow assurance, their system implications, their environmental and economic perspectives with respect to their prospects as storage and transport alternative to the liquefied natural gas technology. (author)

  8. Selection of the optimal combination of water vapor absorption lines for detection of temperature in combustion zones of mixing supersonic gas flows by diode laser absorption spectrometry

    International Nuclear Information System (INIS)

    Mironenko, V.R.; Kuritsyn, Yu.A.; Bolshov, M.A.; Liger, V.V.

    2017-01-01

    Determination of a gas medium temperature by diode laser absorption spectrometry (DLAS) is based on the measurement of integral intensities of the absorption lines of a test molecule (generally water vapor molecule). In case of local thermodynamic equilibrium temperature is inferred from the ratio of the integral intensities of two lines with different low energy levels. For the total gas pressure above 1 atm the absorption lines are broadened and one cannot find isolated well resolved water vapor absorption lines within relatively narrow spectral interval of fast diode laser (DL) tuning range (about 3 cm"−"1). For diagnostics of a gas object in the case of high temperature and pressure DLAS technique can be realized with two diode lasers working in different spectral regions with strong absorption lines. In such situation the criteria of the optimal line selection differs significantly from the case of narrow lines. These criteria are discussed in our work. The software for selection the optimal spectral regions using the HITRAN-2012 and HITEMP data bases is developed. The program selects spectral regions of DL tuning, minimizing the error of temperature determination δT/T, basing on the attainable experimental error of line intensity measurement δS. Two combinations of optimal spectral regions were selected – (1.392 & 1.343 μm) and (1.392 & 1.339 μm). Different algorithms of experimental data processing are discussed.

  9. Safety analysis of RSG-GAS Silicide core using one line cooling system

    International Nuclear Information System (INIS)

    Endiah-Puji-Hastuti

    2003-01-01

    In the frame of minimizing the operation-cost, operation mode using one line cooling system is being evaluated. Maximum reactor has been determined and to continuing this program, steady state and transient analysis were done. The analysis was done by means of a core thermal hydraulic code, COOLOD-N, and PARET. The codes solves core thermal hydraulic equation at steady state conditions and transient, respectively. By using silicide core data and coast down flow rate as the input, thermal hydraulics parameters such as fuel cladding and fuel meat temperatures as well as safety margin against flow instability were calculated. Imposing the safety criteria to the results of steady state and transient analysis, maximum permissible power for this operation was obtained as much as 17.1 MW

  10. Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado

    International Nuclear Information System (INIS)

    1996-05-01

    The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO's circuit on new right-of-way, and reconductoring Western's existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations

  11. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  12. Notice of availability, final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project

    International Nuclear Information System (INIS)

    1999-01-01

    BP Exploration (Alaska) Inc. (BPXA) is proposing to develop the Northstar Unit, located approximately 6 miles offshore of Point Storkensen in the Alaskan Beaufort Sea. BPXA's proposed action is a self-contained development/production facility located on a reconstructed gravel island in 39 feet of water. Also proposed is construction of two buried subsea pipelines between the island and shoreline to transport oil and gas. The pipelines would connect with onshore facilities and the Trans Alaska Pipeline System (TAPS). In response to BPXA's submittal of a permit application under Section 10 of the Rivers and Harbors Act, Section 404 of the Clean Water Act, and Section 103 of the Marine Protection Research and Sanctuaries Act, the US Army Corps of engineers, Alaska District (Corps) determined that issuance of a permit for BPXA's proposed project constituted a major federal action that may significantly affect the quality of the human environment pursuant to the National Environmental Policy Act (NEPA). In addition, the US Environmental Protection Agency (EPA), determined under provisions of the Clean Water Act and 40 CFR Part 6 Subpart F that permitting by the EPA for BPXA's proposed project also constituted a major federal action that my significantly affect the quality of the human environment. As a result, preparation of an Environmental Impact Statement (EIS) under NEPA was undertaken to identify and evaluate a range of reasonable alternatives and evaluate the potential effects the alternates, including BPXA's proposed project, may have on the human environment

  13. Influence of Projection Operator on Oxygen Line Shapes and its effect on Rosseland-Mean Opacity in Stellar Interiors

    Science.gov (United States)

    Gomez, Thomas; Nagayama, Taisukue; Kilcrease, David; Hansen, Stephanie; Montgomery, Mike; Winget, Don

    2018-01-01

    The Rosseland-Mean opacity (RMO) is an important quantity in determining radiation transport through stars. The solar-convection-zone boundary predicted by the standard solar model disagrees with helioseismology measurements by many sigma; a 14% increase in the RMO would resolve this discrepancy. Experiments at Sandia National Laboratories are now measuring iron opacity at solar-interior conditions, and significant discrepancies are already observed. Highly-ionized oxygen is one of the dominant contributions to the RMO. The strongest line, Lyman alpha, is at the peak of the Rosseland weighting function. The accuracy of line-broadening calculations has been called into question due to various experimental results and comparisons between theory. We have developed an ab-initio calculation to explore different physical effects, our current focus is treating penetrating collisions explicitly. The equation of motion used to calculate line shapes within the relaxation and unified theories includes a projection operator, which performs an average over plasma electron states; this is neglected due to past calculations approximate treatment of penetrations. We now include this projection term explicitly, which results in a significant broadening of spectral lines from highly-charged ions (low-Z elements are not much affected). The additional broadening raises the O Ly-alpha wing opacity by a factor of 5; we examine the consequences of this additional broadening on the Rosseland mean.

  14. Implementation of an integrated on-line process surveillance and diagnostic system at the Halden reactor project: MOAS

    International Nuclear Information System (INIS)

    Kim, I.S.; Grini, R.-E.; Nilsen, S.

    2001-01-01

    MOAS is an integrated on-line process surveillance and diagnostic system that uses several different models for knowledge acquisition and diagnostic reasoning, such as goal-tree success-tree model, process monitor trees, and sensor failure diagnosis trees. Within these models, the knowledge of the process and its operation, including deep knowledge, like mass balance or controller algorithm, is incorporated. During an extensive review, made as part of the integrated diagnosis system project of the Halden reactor project, MOAS (Maryland Operator Advisory System) was identified as one of the most thorough systems developed thus far. MOAS encompasses diverse functional aspects that are required for an effective process disturbance management: (1) intelligent process monitoring and alarming, (2) on-line sensor data validation and sensor failure diagnosis, (3) on-line hardware (besides sensors) failure diagnosis, and (4) real-time corrective measure synthesis. The MOAS methodology was used for the NORS (Nokia Research Simulator) process at the Halden man-machine laboratory HAMMLAB of the OECD Halden reactor project. The performance tests of MOAS, implemented in G2 real-time expert system shell, show that MOAS successfully carries out its intended functions, i.e. quickly recognizing an occurring disturbance, correctly diagnosing its cause, and presenting advice on its control to the operator. The lessons learned and insights gained during the implementation and performance tests also are discussed

  15. VUV emission spectra from binary rare gas mixtures near the resonance lines of Xe I and Kr I

    CERN Document Server

    Morozov, A; Gerasimov, G; Arnesen, A; Hallin, R

    2003-01-01

    Emission spectra of Xe-X (X = He, Ne, Ar and Kr) and of Kr-Y (Y = He, Ne and Ar) mixtures with low concentrations of the heavier gases (0.1-1%) and moderate total pressures (50-200 hPa) have been recorded near each of the two resonance lines of Xe and Kr in DC glow capillary discharges. The recorded intense emissions have narrow spectral profiles with FWHM of about 0.1 nm. The profiles are very similar in shape to profiles of known high resolution absorption spectra recorded at comparable gas pressures. A tentative identification of the emission structures is given, which involves transitions in heteronuclear molecules and quasimolecules between weakly-bound states.

  16. Commercial demonstration of atmospheric medium BTU fuel gas production from biomass without oxygen the Burlington, Vermont Project

    Energy Technology Data Exchange (ETDEWEB)

    Rohrer, J.W. [Zurn/NEPCO, South Portland, MA (United States); Paisley, M. [Battelle Laboratories, Columbus, OH (United States)

    1995-12-31

    The first U.S. demonstration of a gas turbine operating on fuel gas produced by the thermal gasification of biomass occurred at Battelle Columbus Labs (BCL) during 1994 using their high throughput indirect medium Btu gasification Process Research Unit (PRU). Zurn/NEPCO was retained to build a commercial scale gas plant utilizing this technology. This plant will have a throughput rating of 8 to 12 dry tons per hour. During a subsequent phase of the Burlington project, this fuel gas will be utilized in a commercial scale gas turbine. It is felt that this process holds unique promise for economically converting a wide variety of biomass feedstocks efficiently into both a medium Btu (500 Btu/scf) gas turbine and IC engine quality fuel gas that can be burned in engines without modification, derating or efficiency loss. Others are currently demonstrating sub-commercial scale thermal biomass gasification processes for turbine gas, utilizing both atmospheric and pressurized air and oxygen-blown fluid bed processes. While some of these approaches hold merit for coal, there is significant question as to whether they will prove economically viable in biomass facilities which are typically scale limited by fuel availability and transportation logistics below 60 MW. Atmospheric air-blown technologies suffer from large sensible heat loss, high gas volume and cleaning cost, huge gas compressor power consumption and engine deratings. Pressurized units and/or oxygen-blown gas plants are extremely expensive for plant scales below 250 MW. The FERCO/BCL process shows great promise for overcoming the above limitations by utilizing an extremely high throughout circulation fluid bed (CFB) gasifier, in which biomass is fully devolitalized with hot sand from a CFB char combustor. The fuel gas can be cooled and cleaned by a conventional scrubbing system. Fuel gas compressor power consumption is reduced 3 to 4 fold verses low Btu biomass gas.

  17. Blurred Lines: The Ethics and Policy of Greenhouse Gas Removal at Scale

    Directory of Open Access Journals (Sweden)

    Emily M. Cox

    2018-05-01

    Full Text Available The topic of Greenhouse Gas Removal (GGR for climate geoengineering is becoming increasingly salient following the IPCC's 5th Assessment Report and the Paris Agreement. GGR is thought of as a separate category to mitigation techniques such as low-carbon supply or demand reduction, yet multiple social, ethical and acceptability concerns cut across categories. We propose moving beyond classifying climate strategies as a set of discrete categories (which may implicitly homogenize diverse technologies, toward a prioritization of questions of scale of both technology and decision-making in the examination of social and ethical risks. This is not just a theoretical issue: important questions for policy, governance and finance are raised, for instance over the future inclusion of GGR in carbon markets. We argue that the conclusions drawn about how best to categorize, govern and incentivize any strategy will depend on the framing used, because different framings could lead to very different policy recommendations being drawn. Because of this, a robust approach to developing, governing and financing GGR should pay attention first to urgent concerns regarding democracy, justice and acceptability.

  18. Sceneries and projections of demands of natural gas in Brazil; Cenario e projecoes das demandas de gas natural no pais

    Energy Technology Data Exchange (ETDEWEB)

    Chianca, Marcos Duilio de Oliveira; Marques, Ziney Dias [SENAI - Servico Nacional de Aprendizagem Industrial, Rio de Janeiro, RJ (Brazil). Sistema FIRJAN

    2004-07-01

    Interest in Natural Gas in Brazil emerged in the second half of the twentieth century, against a background in which the global giants of the petroleum and gas industries stated that reserves within the country were not commercially viable. This scenario changed with the discovery of numerous oil and gas fields and resulted in the participation of numerous foreign companies bidding for exploration and production rights in the new fields established by ANP. Natural Gas has come to assume a new dimension with further recent discoveries in Santos, Espirito Santo, Sergipe and Urucu, with proven reserves in the order of 490 billion m3. This new dimension is reinforced by PETROBRAS's current strategic plan which considers investments in the order of 3.5 Billion U$ dollars for the production, processing and transport of Natural Gas and half a billion dollars for thermoelectric power stations. The use of Natural Gas in industries, in general, and in the generation of electricity will provide a strong push for the country's economy, substituting other sources of energy with the recognized advantages for production and reduced environmental impact. In this new era 24 gas distribution companies, widely distributed throughout Brazil, are also programming new investments to make best the use of Natural Gas for industry, commerce, for the residential sector and throughout all the national territory. (author)

  19. Sceneries and projections of demands of natural gas in Brazil; Cenario e projecoes das demandas de gas natural no pais

    Energy Technology Data Exchange (ETDEWEB)

    Chianca, Marcos Duilio de Oliveira; Marques, Ziney Dias [SENAI - Servico Nacional de Aprendizagem Industrial, Rio de Janeiro, RJ (Brazil). Sistema FIRJAN

    2004-07-01

    Interest in Natural Gas in Brazil emerged in the second half of the twentieth century, against a background in which the global giants of the petroleum and gas industries stated that reserves within the country were not commercially viable. This scenario changed with the discovery of numerous oil and gas fields and resulted in the participation of numerous foreign companies bidding for exploration and production rights in the new fields established by ANP. Natural Gas has come to assume a new dimension with further recent discoveries in Santos, Espirito Santo, Sergipe and Urucu, with proven reserves in the order of 490 billion m3. This new dimension is reinforced by PETROBRAS's current strategic plan which considers investments in the order of 3.5 Billion U$ dollars for the production, processing and transport of Natural Gas and half a billion dollars for thermoelectric power stations. The use of Natural Gas in industries, in general, and in the generation of electricity will provide a strong push for the country's economy, substituting other sources of energy with the recognized advantages for production and reduced environmental impact. In this new era 24 gas distribution companies, widely distributed throughout Brazil, are also programming new investments to make best the use of Natural Gas for industry, commerce, for the residential sector and throughout all the national territory. (author)

  20. Preliminary studies of using preheated carrier gas for on-line membrane extraction of semivolatile organic compounds.

    Science.gov (United States)

    Liu, Xinyu; Pawliszyn, Janusz

    2007-04-01

    In this paper, we present results for the on-line determination of semivolatile organic compounds (SVOCs) in air using membrane extraction with a sorbent interface-ion mobility spectrometry (MESI-IMS) system with a preheated carrier (stripping) gas. The mechanism of the mass transfer of SVOCs across a membrane was initially studied. In comparison with the extraction of volatile analytes, the mass transfer resistance that originated from the slow desorption from the internal membrane surface during the SVOC extraction processes should be taken into account. A preheated carrier gas system was therefore built to facilitate desorption of analytes from the internal membrane surface. With the benefit of a temperature gradient existing between the internal and external membrane surfaces, an increase in the desorption rate of a specific analyte at the internal surface and the diffusion coefficient within the membrane could be achieved while avoiding a decrease of the distribution constant on the external membrane interface. This technique improved both the extraction rate and response times of the MESI-IMS system for the analysis of SVOCs. Finally, the MESI-IMS system was shown to be capable of on-site measurement by monitoring selected polynuclear aromatic hydrocarbons emitted from cigarette smoke.

  1. Fire and Gas Detection in the LHC Experiments The Sniffer Project

    CERN Document Server

    Nunes, R W

    2001-01-01

    The LHC experiments, due to their complexity and size, present many safety challenges. Cryogenic gases are used in large quantities as well as certain flammable mixtures. The electrical power involved calls for analysis of the fire risks. Access is restricted to the minimum and environmental conditions are extremely harsh, due to strong magnetic fields and ionising radiation. This paper will describe the Combined Fire/Gas/Oxygen deficiency Detection systems proposed for inside the ATLAS and CMS Experiments and possibly for the two others, if they deem it necessary. The requirements of the experiments and the development and implementation of such a system will be discussed. In parallel, commercial procedures to implement these systems by industry shall be described, taking into consideration that a previous development has already been undertaken by CERN for the LEP experiments. The stage is set for inter-divisional collaboration in a project of utmost importance for the safety of people and protection of the...

  2. High Temperature Gas-Cooled Reactor Projected Markets and Preliminary Economics

    Energy Technology Data Exchange (ETDEWEB)

    Larry Demick

    2011-08-01

    This paper summarizes the potential market for process heat produced by a high temperature gas-cooled reactor (HTGR), the environmental benefits reduced CO2 emissions will have on these markets, and the typical economics of projects using these applications. It gives examples of HTGR technological applications to industrial processes in the typical co-generation supply of process heat and electricity, the conversion of coal to transportation fuels and chemical process feedstock, and the production of ammonia as a feedstock for the production of ammonia derivatives, including fertilizer. It also demonstrates how uncertainties in capital costs and financial factors affect the economics of HTGR technology by analyzing the use of HTGR technology in the application of HTGR and high temperature steam electrolysis processes to produce hydrogen.

  3. A fence line noble gas monitoring system for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Grasty, R.L.; Hovgaard, J.; LaMarre, J.R

    2001-07-01

    A noble gas monitoring system has been installed at Ontario Power Generations' Pickering Nuclear Generating Station (PNGS) near Toronto, Canada. This monitoring system allows a direct measure of air kerma from external radiation instead of calculating this based on plant emission data and meteorological models. This has resulted in a reduction in the reported effective dose from external radiation by a factor of at least ten. The system consists of nine self-contained units, each with a 7.6 cm x 7.6 cm (3 inch x 3 inch) NaI(Tl) detector that is calibrated for air kerma. The 512-channel gamma ray spectral information is downloaded daily from each unit to a central computer where the data are stored and processed. A spectral stripping procedure is used to remove natural background variations from the spectral windows used to monitor xenon-133 ({sup 133}Xe), xenon-135 ({sup 135}Xe), argon-41 ({sup 41}Ar), and skyshine radiation from the use of radiography sources. Typical monthly minimum detection limits in air kerma are 0.3 nGy for {sup 133}Xe, 0.7 nGy for {sup 135}Xe, 3 nGy for {sup 41}Ar and 2 nGy for skyshine radiation. Based on 9 months of continuous operation, the annualised air kerma due to {sup 133}Xe, {sup 135}Xe and {sup 41}Ar and skyshine radiation were 7 nGy, 8 nGy, 26 nGy and 107 nGy respectively. (author)

  4. Long-term trends in U.S. gas transportation: 1992 edition of the GRI baseline projection of U.S. energy supply and demand to 2010, June 1992. Gas Research Insights

    International Nuclear Information System (INIS)

    Lihn, M.L.; Woods, T.J.

    1992-06-01

    The paper summarizes the trends in lower-48 gas transportation in the 1992 Edition of the GRI Baseline Projection of U.S. Energy Supply and Demand to 2010, which has been adopted as a major input to the planning cycle leading to the development of the Gas Research Institute (GRI) 1993 research and development program. The 1992 projection presents an optimistic outlook for the U.S. gas industry in which increased gas supply can be obtained at competitive prices

  5. Parallelism at Cern: real-time and off-line applications in the GP-MIMD2 project

    International Nuclear Information System (INIS)

    Calafiura, P.

    1997-01-01

    A wide range of general purpose high-energy physics applications, ranging from Monte Carlo simulation to data acquisition, from interactive data analysis to on-line filtering, have been ported, or developed, and run in parallel on IBM SP-2 and Meiko CS-2 CERN large multi-processor machines. The ESPRIT project GP-MIMD2 has been a catalyst for the interest in parallel computing at CERN. The project provided the 128 processor Meiko CS-2 system that is now succesfully integrated in the CERN computing environment. The CERN experiment NA48 was involved in the GP-MIMD2 project since the beginning. NA48 physicists run, as part of their day-to-day work, simulation and analysis programs parallelized using the message passing interface MPI. The CS-2 is also a vital component of the experiment data acquisition system and will be used to calibrate in real-time the 13000 channels liquid krypton calorimeter. (orig.)

  6. The gas-phase on-line production of phosphoryl halides, Pox sub 3 and their identification by infrared spectroscopy

    International Nuclear Information System (INIS)

    Allaf, A.W.

    1999-01-01

    A new route has been devised, leading to the production of Pox sub 3 molecules where X=F, Br and I by an on-line process using phosphoryl chloride, POCI sub 3 as a starting material passed over heated sodium fluoride, NaF, potassium bromide, KBr and potassium iodide, K1 at 535 Centigrade, 690 Centigrade and 480 Centigrade, respectively. The low resolution gas-phase fourier transform infrared spectra reported for the first time showed strong bands centered at 1411.6, 1322.9, 1300.8 and 1285 cm sup - 1, assigned to EPSILON sub 1 (a sub 1), the O = P stretching fundamental of POF sub 3 , POCI sub 3 , POBr sub 3 and POI sub 3 , respectively. Attempts were made to prepare POCI sub 2 and POBr sub 2 , by an on-line process using POCI sub 3 again but passed over heated sodium and potassium bromide for POCI sub 2 and POBr sub 2. (author)

  7. Real-time trace gas sensor using a multimode diode laser and multiple-line integrated cavity enhanced absorption spectroscopy.

    Science.gov (United States)

    Karpf, Andreas; Rao, Gottipaty N

    2015-07-01

    We describe and demonstrate a highly sensitive trace gas sensor based on a simplified design that is capable of measuring sub-ppb concentrations of NO2 in tens of milliseconds. The sensor makes use of a relatively inexpensive Fabry-Perot diode laser to conduct off-axis cavity enhanced spectroscopy. The broad frequency range of a multimode Fabry-Perot diode laser spans a large number of absorption lines, thereby removing the need for a single-frequency tunable laser source. The use of cavity enhanced absorption spectroscopy enhances the sensitivity of the sensor by providing a pathlength on the order of 1 km in a small volume. Off-axis alignment excites a large number of cavity modes simultaneously, thereby reducing the sensor's susceptibility to vibration. Multiple-line integrated absorption spectroscopy (where one integrates the absorption spectra over a large number of rovibronic transitions of the molecular species) further improves the sensitivity of detection. Relatively high laser power (∼400  mW) is used to compensate for the low coupling efficiency of a broad linewidth laser to the optical cavity. The approach was demonstrated using a 407 nm diode laser to detect trace quantities of NO2 in zero air. Sensitivities of 750 ppt, 110 ppt, and 65 ppt were achieved using integration times of 50 ms, 5 s, and 20 s respectively.

  8. Air quality impacts of projections of natural gas-fired distributed generation

    Science.gov (United States)

    Horne, Jeremy R.; Carreras-Sospedra, Marc; Dabdub, Donald; Lemar, Paul; Nopmongcol, Uarporn; Shah, Tejas; Yarwood, Greg; Young, David; Shaw, Stephanie L.; Knipping, Eladio M.

    2017-11-01

    This study assesses the potential impacts on emissions and air quality from the increased adoption of natural gas-fired distributed generation of electricity (DG), including displacement of power from central power generation, in the contiguous United States. The study includes four major tasks: (1) modeling of distributed generation market penetration; (2) modeling of central power generation systems; (3) modeling of spatially and temporally resolved emissions; and (4) photochemical grid modeling to evaluate the potential air quality impacts of increased DG penetration, which includes both power-only DG and combined heat and power (CHP) units, for 2030. Low and high DG penetration scenarios estimate the largest penetration of future DG units in three regions - New England, New York, and California. Projections of DG penetration in the contiguous United States estimate 6.3 GW and 24 GW of market adoption in 2030 for the low DG penetration and high DG penetration scenarios, respectively. High DG penetration (all of which is natural gas-fired) serves to offset 8 GW of new natural gas combined cycle (NGCC) units, and 19 GW of solar photovoltaic (PV) installations by 2030. In all scenarios, air quality in the central United States and the northwest remains unaffected as there is little to no DG penetration in those states. California and several states in the northeast are the most impacted by emissions from DG units. Peak increases in maximum daily 8-h average ozone concentrations exceed 5 ppb, which may impede attainment of ambient air quality standards. Overall, air quality impacts from DG vary greatly based on meteorological conditions, proximity to emissions sources, the number and type of DG installations, and the emissions factors used for DG units.

  9. Fuel Gas Demonstration Plant Program: Small-Scale Industrial Project. Environmental assessment statement

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    Solid, liquid, and gaseous by-products and wastes are generated during coal storage and processing, gasification, and gas cleanup. Recovery systems have been designed to collect and utilize by-products. Wastes will be placed in storage areas designed to prevent release of the materials to the environment. The coal gasification plant along with the solid waste disposal area will occupy approximately 115 acres. To prevent, to the fullest extent possible, degradation of groundwater and surface water resources, the coal stockpile, landfill, collection pond, settling basin, and drainage ditches will be constructed to prevent the seepage of potential contaminants into groundwater or the drainage of runoff into surface waters. Cooling water is the primary water requirement of the project. None of the water utilized in the gasification plant will be released into the area surface water system, but will be either recycled or directed into the settling basin. The gasification facility has the potential of emitting a broad spectrum of pollutants into the atmosphere. However, effective emission control procedures such as off-gas recycling, hydrogen sulfide removal, particulate removal, and flaring will be applied to minimize the plant's emissions. The necessity of monitoring the more exotic pollutants such as acid gases, trace elements, metal carbonyls, and a multitude of organic compounds, will be determined as the gasification facility becomes more of a reality and the latest literature and research developments can be surveyed to evaluate the emission rates, biological significance, and monitoring techniques for these pollutants.

  10. Prevented Mortality and Greenhouse Gas Emissions From Historical and Projected Nuclear Power

    Science.gov (United States)

    Kharecha, Pushker A.; Hansen, James E.

    2013-01-01

    In the aftermath of the March 2011 accident at Japan's Fukushima Daiichi nuclear power plant, the future contribution of nuclear power to the global energy supply has become somewhat uncertain. Because nuclear power is an abundant, low-carbon source of base-load power, it could make a large contribution to mitigation of global climate change and air pollution. Using historical production data, we calculate that global nuclear power has prevented an average of 1.84 million air pollution-related deaths and 64 gigatonnes of CO2-equivalent (GtCO2-eq) greenhouse gas (GHG) emissions that would have resulted from fossil fuel burning. On the basis of global projection data that take into account the effects of the Fukushima accident, we find that nuclear power could additionally prevent an average of 420 000-7.04 million deaths and 80-240 GtCO2-eq emissions due to fossil fuels by midcentury, depending on which fuel it replaces. By contrast, we assess that large-scale expansion of unconstrained natural gas use would not mitigate the climate problem and would cause far more deaths than expansion of nuclear power.

  11. Study of reconstruction methods for a time projection chamber with GEM gas amplification system

    Energy Technology Data Exchange (ETDEWEB)

    Diener, R.

    2006-12-15

    A new e{sup +}e{sup -} linear collider with an energy range up to 1TeV is planned in an international collaboration: the International Linear Collider (ILC). This collider will be able to do precision measurements of the Higgs particle and of physics beyond the Standard Model. In the Large Detector Concept (LDC) - which is one proposal for a detector at the ILC - a Time Projection Chamber (TPC) is foreseen as the main tracking device. To meet the requirements on the resolution and to be able to work in the environment at the ILC, the application of new gas amplification technologies in the TPC is necessary. One option is an amplification system based on Gas Electron Multipliers (GEMs). Due to the - in comparison with older technologies - small spatial width of the signals, this technology poses new requirements on the readout structures and the reconstruction methods. In this work, the performance and the systematics of different reconstruction methods have been studied, based on data measured with a TPC prototype in high magnetic fields of up to 4T and data from a Monte Carlo simulation. The latest results of the achievable point resolution are presented and their limitations have been investigated. (orig.)

  12. Study of reconstruction methods for a time projection chamber with GEM gas amplification system

    International Nuclear Information System (INIS)

    Diener, R.

    2006-12-01

    A new e + e - linear collider with an energy range up to 1TeV is planned in an international collaboration: the International Linear Collider (ILC). This collider will be able to do precision measurements of the Higgs particle and of physics beyond the Standard Model. In the Large Detector Concept (LDC) - which is one proposal for a detector at the ILC - a Time Projection Chamber (TPC) is foreseen as the main tracking device. To meet the requirements on the resolution and to be able to work in the environment at the ILC, the application of new gas amplification technologies in the TPC is necessary. One option is an amplification system based on Gas Electron Multipliers (GEMs). Due to the - in comparison with older technologies - small spatial width of the signals, this technology poses new requirements on the readout structures and the reconstruction methods. In this work, the performance and the systematics of different reconstruction methods have been studied, based on data measured with a TPC prototype in high magnetic fields of up to 4T and data from a Monte Carlo simulation. The latest results of the achievable point resolution are presented and their limitations have been investigated. (orig.)

  13. THE LICK AGN MONITORING PROJECT 2011: SPECTROSCOPIC CAMPAIGN AND EMISSION-LINE LIGHT CURVES

    Energy Technology Data Exchange (ETDEWEB)

    Barth, Aaron J. [Department of Physics and Astronomy, 4129 Frederick Reines Hall, University of California, Irvine, CA, 92697-4575 (United States); Bennert, Vardha N. [Physics Department, California Polytechnic State University, San Luis Obispo, CA 93407 (United States); Canalizo, Gabriela [Department of Physics and Astronomy, University of California, Riverside, CA 92521 (United States); Filippenko, Alexei V.; Li, Weidong [Department of Astronomy, University of California, Berkeley, CA 94720-3411 (United States); Gates, Elinor L. [Lick Observatory, P.O. Box 85, Mount Hamilton, CA 95140 (United States); Greene, Jenny E. [Department of Astrophysical Sciences, Princeton University, Princeton, NJ 08544 (United States); Malkan, Matthew A.; Treu, Tommaso [Department of Physics and Astronomy, University of California, Los Angeles, CA 90095-1547 (United States); Pancoast, Anna [Department of Physics, University of California, Santa Barbara, CA 93106 (United States); Sand, David J. [Texas Tech University, Physics Department, Box 41051, Lubbock, TX 79409-1051 (United States); Stern, Daniel [Jet Propulsion Laboratory, California Institute of Technology, 4800 Oak Grove Boulevard, Pasadena, CA 91109 (United States); Woo, Jong-Hak [Astronomy Program, Department of Physics and Astronomy, Seoul National University, Seoul 151-742 (Korea, Republic of); Assef, Roberto J. [Núcleo de Astronomía de la Facultad de Ingeniería, Universidad Diego Portales, Av. Ejército Libertador 441, Santiago (Chile); Bae, Hyun-Jin [Department of Astronomy and Center for Galaxy Evolution Research, Yonsei University, Seoul 120-749 (Korea, Republic of); Brewer, Brendon J. [Department of Statistics, The University of Auckland, Private Bag 92019, Auckland 1142 (New Zealand); Cenko, S. Bradley [Astrophysics Science Division, NASA Goddard Space Flight Center, MC 661, Greenbelt, MD 20771 (United States); and others

    2015-04-15

    In the Spring of 2011 we carried out a 2.5 month reverberation mapping campaign using the 3 m Shane telescope at Lick Observatory, monitoring 15 low-redshift Seyfert 1 galaxies. This paper describes the observations, reductions and measurements, and data products from the spectroscopic campaign. The reduced spectra were fitted with a multicomponent model in order to isolate the contributions of various continuum and emission-line components. We present light curves of broad emission lines and the active galactic nucleus (AGN) continuum, and measurements of the broad Hβ line widths in mean and rms spectra. For the most highly variable AGNs we also measured broad Hβ line widths and velocity centroids from the nightly spectra. In four AGNs exhibiting the highest variability amplitudes, we detect anticorrelations between broad Hβ width and luminosity, demonstrating that the broad-line region “breathes” on short timescales of days to weeks in response to continuum variations. We also find that broad Hβ velocity centroids can undergo substantial changes in response to continuum variations; in NGC 4593, the broad Hβ velocity shifted by ∼250 km s{sup −1} over a 1 month period. This reverberation-induced velocity shift effect is likely to contribute a significant source of confusion noise to binary black hole searches that use multi-epoch quasar spectroscopy to detect binary orbital motion. We also present results from simulations that examine biases that can occur in measurement of broad-line widths from rms spectra due to the contributions of continuum variations and photon-counting noise.

  14. An empirical study on key factors for purchasing strategy on project based organizations: A case study of gas field development projects

    Directory of Open Access Journals (Sweden)

    Aboulfazl Kazazi

    2012-08-01

    Full Text Available One of the primary concerns in development of oil and gas resources is to find the critical success factors associated with different important projects. Purchasing and procurement plays a key role in these projects. There is no doubt that in history of similar studies, there are not much studies to determine key factors. The proposed study of this paper presents an empirical study to find these factors in one of the most important gas filed in Iran is now South Pars Gas Field. The study distributes a questionnaire consists of various questions associated with purchasing activities. We investigate the feedbacks gathered from decision makers using factor analysis. The results of our survey reveal that there are three categories of organizational strategy, the relative importance of strategy and risk according to factor analysis. Each factor consists of many other factors and the relative importance of all factors are investigated.

  15. Regional Mapping and Resource Assessment of Shallow Gas Hydrates of Japan Sea - METI Launched 3 Years Project in 2013.

    Science.gov (United States)

    Matsumoto, R.

    2014-12-01

    Agency of Natural Resources and Energy of METI launched a 3 years shallow gas hydrate exploration project in 2013 to make a precise resource assessment of shallow gas hydrates in the eastern margin of Japan Sea and around Hokkaido. Shallow gas hydrates of Japan Sea occur in fine-grained muddy sediments of shallow subsurface of mounds and gas chimneys in the form of massive nodular to platy accumulation. Gas hydrate bearing mounds are often associated with active methane seeps, bacterial mats and carbonate concretions and pavements. Gases of gas hydrates are derived either from deep thermogenic, shallow microbial or from the mixed gases, contrasting with totally microbial deep-seated stratigraphically controlled hydrates. Shallow gas hydrates in Japan Sea have not been considered as energy resource due to its limited distribution in narrow Joetsu basin. However recently academic research surveys have demonstrated regional distribution of gas chimney and hydrate mound in a number of sedimentary basins along the eastern margin of Japan Sea. Regional mapping of gas chimney and hydrate mound by means of MBES and SBP surveys have confirmed that more than 200 gas chimneys exist in 100 km x 100 km area. ROV dives have identified dense accumulation of hydrates on the wall of half collapsed hydrate mound down to 30 mbsf. Sequential LWD and shallow coring campaign in the Summer of 2014, R/V Hakurei, which is equipped with Fugro Seacore R140 drilling rig, drilled through hydrate mounds and gas chimneys down to the BGHS (base of gas hydrate stability) level and successfully recovered massive gas hydrates bearing sediments from several horizons.

  16. Gulf of Mexico Gas Hydrate Joint Industry Project Leg II logging-while-drilling data acquisition and analysis

    Science.gov (United States)

    Collett, Timothy S.; Lee, Wyung W.; Zyrianova, Margarita V.; Mrozewski, Stefan A.; Guerin, Gilles; Cook, Ann E.; Goldberg, Dave S.

    2012-01-01

    One of the objectives of the Gulf of Mexico Gas Hydrate Joint Industry Project Leg II (GOM JIP Leg II) was the collection of a comprehensive suite of logging-while-drilling (LWD) data within gas-hydrate-bearing sand reservoirs in order to make accurate estimates of the concentration of gas hydrates under various geologic conditions and to understand the geologic controls on the occurrence of gas hydrate at each of the sites drilled during this expedition. The LWD sensors just above the drill bit provided important information on the nature of the sediments and the occurrence of gas hydrate. There has been significant advancements in the use of downhole well-logging tools to acquire detailed information on the occurrence of gas hydrate in nature: From using electrical resistivity and acoustic logs to identify gas hydrate occurrences in wells to where wireline and advanced logging-while-drilling tools are routinely used to examine the petrophysical nature of gas hydrate reservoirs and the distribution and concentration of gas hydrates within various complex reservoir systems. Recent integrated sediment coring and well-log studies have confirmed that electrical resistivity and acoustic velocity data can yield accurate gas hydrate saturations in sediment grain supported (isotropic) systems such as sand reservoirs, but more advanced log analysis models are required to characterize gas hydrate in fractured (anisotropic) reservoir systems. In support of the GOM JIP Leg II effort, well-log data montages have been compiled and presented in this report which includes downhole logs obtained from all seven wells drilled during this expedition with a focus on identifying and characterizing the potential gas-hydrate-bearing sedimentary section in each of the wells. Also presented and reviewed in this report are the gas-hydrate saturation and sediment porosity logs for each of the wells as calculated from available downhole well logs.

  17. Evaluation of double drop beads pavement edge lines : SPR project description.

    Science.gov (United States)

    2009-01-01

    In UTCA projects 01465 and 04405, the retroreflectivities and the life cycle costs were measured and compared for standard Alabama Department of Transportation (ALDOT) thermoplastic edge : stripes that contained only one size of retroreflective beads...

  18. Project resumes: biological effects from electric fields associated with high-voltage transmission lines

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-01

    Abstracts of research projects are presented in the following areas: measurements and special facilities; cellular and subcellular studies; physiology; behavior; environmental effects; modeling, scaling and dosimetry; and high voltage direct current. (ACR)

  19. A Survey of Metal Lines at High Redshift. II. SDSS Absorption Line Studies—O VI Line Density, Space Density, and Gas Metallicity at z abs ~ 3.0

    Science.gov (United States)

    Frank, S.; Mathur, S.; Pieri, M.; York, D. G.

    2010-09-01

    We have analyzed a large data set of O VI absorber candidates found in the spectra of 3702 Sloan Digital Sky Survey (SDSS) quasars, focusing on a subsample of 387 active galactic nuclei sight lines with an average S/N >=5.0, allowing for the detection of absorbers above a rest-frame equivalent width limit of W r >= 0.19 Å for the O VI 1032 Å component. Accounting for random interlopers mimicking an O VI doublet, we derive for the first time a secure lower limit for the redshift number density ΔN/Δz for redshifts z abs >= 2.8. With extensive Monte Carlo simulations, we quantify the losses of absorbers due to blending with the ubiquitous Lyα forest lines and estimate the success rate of retrieving each individual candidate as a function of its redshift, the emission redshift of the quasar, the strength of the absorber, and the measured signal-to-noise ratio (S/N) of the spectrum by modeling typical Lyman forest spectra. These correction factors allow us to derive the "incompleteness and S/N-corrected" redshift number densities of O VI absorbers: ΔN O VI,c /Δzc (2.8 secure lower limit for the contribution of O VI to the closure mass density at the redshifts probed here: ΩO VI (2.8 = 1.9 × 10-8 h -1. We show that the strong lines we probe account for over 65% of the mass in the O VI absorbers; the weak absorbers, while dominant in line number density, do not contribute significantly to the mass density. Making a conservative assumption about the ionization fraction, {O VI}/{O}, and adopting the Anders & Grevesse solar abundance values, we derive the mean metallicity of the gas probed in our search: ζ(2.8 = 3.6 × 10-4 h, in good agreement with other studies. These results demonstrate that large spectroscopic data sets such as SDSS can play an important role in QSO absorption line studies, in spite of the relatively low resolution.

  20. A SURVEY OF METAL LINES AT HIGH REDSHIFT. II. SDSS ABSORPTION LINE STUDIES-O VI LINE DENSITY, SPACE DENSITY, AND GAS METALLICITY AT zabs ∼ 3.0

    International Nuclear Information System (INIS)

    Frank, S.; Mathur, S.; Pieri, M.; York, D. G.

    2010-01-01

    We have analyzed a large data set of O VI absorber candidates found in the spectra of 3702 Sloan Digital Sky Survey (SDSS) quasars, focusing on a subsample of 387 active galactic nuclei sight lines with an average S/N ≥5.0, allowing for the detection of absorbers above a rest-frame equivalent width limit of W r ≥ 0.19 A for the O VI 1032 A component. Accounting for random interlopers mimicking an O VI doublet, we derive for the first time a secure lower limit for the redshift number density ΔN/Δz for redshifts z abs ≥ 2.8. With extensive Monte Carlo simulations, we quantify the losses of absorbers due to blending with the ubiquitous Lyα forest lines and estimate the success rate of retrieving each individual candidate as a function of its redshift, the emission redshift of the quasar, the strength of the absorber, and the measured signal-to-noise ratio (S/N) of the spectrum by modeling typical Lyman forest spectra. These correction factors allow us to derive the 'incompleteness and S/N-corrected' redshift number densities of O VI absorbers: ΔN O V I,c /Δz c (2.8 O V I,c /Δz c (3.2 O V I,c /Δz c (3.6 O V I (2.8 -8 h -1 . We show that the strong lines we probe account for over 65% of the mass in the O VI absorbers; the weak absorbers, while dominant in line number density, do not contribute significantly to the mass density. Making a conservative assumption about the ionization fraction, O VI /O, and adopting the Anders and Grevesse solar abundance values, we derive the mean metallicity of the gas probed in our search: ζ(2.8 -4 h, in good agreement with other studies. These results demonstrate that large spectroscopic data sets such as SDSS can play an important role in QSO absorption line studies, in spite of the relatively low resolution.

  1. Participatory ergonomics in industrial engineering projects: The case of a new cheese packaging line work system

    DEFF Research Database (Denmark)

    Souza da Conceição, Carolina; Broberg, Ole; Aldrich, Per

    2014-01-01

    The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system.......The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system....

  2. Are you a Project Leader, PSO, GLIMOS?! Are you in line to be one?

    CERN Multimedia

    HSE Unit

    2013-01-01

    You can count on a Safety training course to assist you in:   respecting CERN Safety rules and agreements with the Host States;   ensuring that applicable Safety rules/practices are respected or that acceptable Safety measures are known and implemented in your project/experiment;   creating Safety files/folders for your project/experiment;   obtaining HSE Safety Clearance.   Sign in to CTA here.

  3. The SAURON project - VI. Line strength maps of 48 elliptical and lenticular galaxies

    NARCIS (Netherlands)

    Kuntschner, Harald; Emsellem, Eric; Bacon, R.; Bureau, M.; Cappellari, Michele; Davies, Roger L.; de Zeeuw, P. T.; Falcon-Barroso, Jesus; Krajnovic, Davor; McDermid, Richard M.; Peletier, Reynier F.; Sarzi, Marc

    2006-01-01

    We present absorption line strength maps of 48 representative elliptical and lenticular galaxies obtained as part of a survey of nearby galaxies using our custom-built integral-field spectrograph, SAURON, operating on the William Herschel Telescope. Using high-quality spectra, spatially binned to a

  4. The SAURON project : XVIII. The integrated UV-line-strength relations of early-type galaxies

    NARCIS (Netherlands)

    Bureau, Martin; Jeong, Hyunjin; Yi, Sukyoung K.; Schawinski, Kevin; Houghton, Ryan C. W.; Davies, Roger L.; Bacon, Roland; Cappellari, Michele; de Zeeuw, P. Tim; Emsellem, Eric; Falcon-Barroso, Jesus; Krajnovic, Davor; Kuntschner, Harald; McDermid, Richard M.; Peletier, Reynier F.; Sarzi, Marc; Sohn, Young-Jong; Thomas, Daniel; van den Bosch, Remco C. E.; van de Ven, Glenn

    Using far-ultraviolet (FUV) and near-ultraviolet (NUV) photometry from guest investigator programmes on the Galaxy Evolution Explorer (GALEX) satellite, optical photometry from the MDM Observatory and optical integral-field spectroscopy from SAURON, we explore the UV-line-strength relations of the

  5. GGE Biplot projection in discriminating the efficiency of popcorn lines to use nitrogen

    Directory of Open Access Journals (Sweden)

    Adriano dos Santos

    Full Text Available ABSTRACT Nitrogen is essential for sustaining life on the planet, and it is the most important nutrient for obtaining high agricultural production. However, their use leads to the release of nitrous oxide with a global warming potential 296 times higher than the CO2 molecule, making it a challenge to reduce their use in agriculture. The objective of this research was to identify efficient popcorn inbred lines and responsive nitrogen use and exhibit a good expansion volume. For this, 29 inbred lines from the Germplasm Collection of Darcy Ribeiro North Fluminense State University (UENF were evaluated at two contrasting levels of nitrogen availability (low and ideal at two representative locations in the north and northwest of the state of Rio de Janeiro, Brazil, arranged in a randomized block design with three replicates. These inbred lines were discriminated against efficient use of nitrogen by multivariate GGE Biplot. Selective accuracy was close to 1, showing that the genotypes were enough to provide contrasting success in selection procedures. The first two main components (PC retained 93.82% of the total variation, and PC1 furnished an information ratio (IR that was unaffected by noise. L77 was the most unstable line, while P7, P2, P6, P3, P5, P4, P9, P10, P8, P9, L70, L74, and L55 were efficient and responsive. The GGE biplot method is recommended for the reliable identification of popcorn lines that are efficient and responsive to the use of nitrogen.

  6. Linking Effective Project Management to Business Strategy in Oil and Gas Industry through Decision-making Processes

    Science.gov (United States)

    Adeleke, Adeyinka

    The construction project in the oil and gas industry covers the entire spectrum of hydrocarbon production from the wellhead (upstream) to downstream facilities. In each of these establishments, the activities in a construction project include: consulting, studies, front-end engineering, detail engineering, procurement, program management, construction, installation, commissioning and start-up. Efficient management of each of the activities involved in construction projects is one of the driving forces for the successful completion of the project. Optimizing the crucial factors in project management during each phase of a project in an oil and gas industry can assist managers to maximize the use of available resources and drive the project to successful conclusions. One of these factors is the decision-making process in the construction project. Current research effort investigated the relationship between decision-making processes and business strategy in oil and gas industry using employee surveys. I recruited employees of different races, age group, genders, and years of experience in order understand their influence on the implementation of the decision-making process in oil and gas industry through a quantitative survey. Decision-making was assessed using five decision measures: (a) rational, (b) intuitive, (c) dependent, (d) avoidant, and (e) spontaneous. The findings indicated gender, age, years of work experience and job titles as primary variables with a negative relationship with decision-making approach for employees working in a major oil and gas industry. The study results revealed that the two most likely decision-making methods in oil and gas industry include: making a decision in a logical and systematic way and seek assistance from others when making a decision. Additionally, the two leading management approaches to decision-making in the oil and gas industry include: decision analysis is part of organization culture and management is committed to

  7. Advanced fuel gas desulfurization (AFGD) demonstration project. Technical progress report No. 19, July 1, 1994--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The {open_quotes}Advanced Flue Gas Desulfurization (AFGD) Demonstration Project{close_quotes} is a $150.5 million cooperative effort between the U.S. Department of Energy and Pure Air, a general partnership of Air Products and Chemicals, Inc. and Mitsubishi Heavy Industries America, Inc. The AFGD process is one of several alternatives to conventional flue gas desulfurization (FGD) being demonstrated under the Department of Energy`s Clean Coal Technology Demonstration Program. The AFGD demonstration project is located at the Northern Indiana Public Service Company`s Bailly Generating Station, about 12 miles northeast of Gary, Indiana.

  8. Development of cross border gas transmission projects raise challenging issues. Case studies: The transmed and the Maghreb/Europe pipelines

    International Nuclear Information System (INIS)

    Khene, D.

    1997-01-01

    Development of cross border gas transmission projects raise complex and interdependent issues whose successful resolution require not only technical and management strengths but also a close cooperation between the key players involved in the game. In this paper we shall attempt to explain some of the major issues encountered during the appraisal and construction of long distance gas pipeline schemes. The information used derive essentially from the experience gained during the development of the Trans-mediterranean and the Maghreb/Europe pipelines. Running through the various issues we shall also identify and then discuss a number of factors which contributed to the successful implementation of these two projects. (au)

  9. Using the van der Waals broadening of the spectral atomic lines to measure the gas temperature of an argon microwave plasma at atmospheric pressure

    International Nuclear Information System (INIS)

    Yubero, C.; Dimitrijevic, M.S.; Garcia, M.C.; Calzada, M.D.

    2007-01-01

    The ro-vibrational emission spectra of the molecular species are usually used to measure the gas temperature of a discharge at atmospheric pressure. However, under some experimental conditions, it is difficult to detect them. In order to overcome this difficulty and obtain the temperature, there are methods based on the relation between the gas temperature and the van der Waals broadening of argon atomic spectral lines with a Stark contribution negligible. In this work, we propose a method based on this relation but for lines with a Stark broadening comparable with the van der Waals one

  10. Project for a beam line consecrated to soft condensed matter, common heterogeneous materials and non-crystalline materials on soleil

    International Nuclear Information System (INIS)

    Ne, F.; Zemb, T.

    1998-01-01

    This project is a part of the 'SOLEIL' synchrotron project. The camera proposed is optimized for small angle x-ray scattering in the domain of soft condensed matter, common heterogeneous materials such as wood, cements, glass, and more generally non-crystalline materials. The beam line is designed to allow a quick succession of different users without time consuming adjustments. Therefore, optical settings are minimized, taking into account the pluri-disciplinary nature of the analysis possibilities. To this end, the technical requirements are as follows. First and essentially, the wave-length has to be fixed and set around 12 keV. Focusing mirrors, optics to sample and sample to detector distances, and the size of the detector allow for a wide range of wave vector to be used. Rejection rate will be lower, and angular dynamical range will be larger than any of the current synchrotron lines. We want this line to be, and to stay, complementary to more specific systems, such as reflectivity experiments or grazing angle scattering experiments. However, we are thinking of an adaptation to ultra small angle scattering mode, based on the Bonse and Hart camera. Such equipment, actually a kind of 'Instamatic' of the reciprocal space, will fulfill to the need of chemical engineers, biophysicists or material scientists interested in hard as well as soft condensed matter. It will allow a large amount of experiments per time unit. (author)

  11. Expansion of the On-line Archive "Statistically Downscaled WCRP CMIP3 Climate Projections"

    Science.gov (United States)

    Brekke, L. D.; Pruitt, T.; Maurer, E. P.; Das, T.; Duffy, P.; White, K.

    2009-12-01

    Presentation highlights status and plans for a public-access archive of downscaled CMIP3 climate projections. Incorporating climate projection information into long-term evaluations of water and energy resources requires analysts to have access to projections at "basin-relevant" resolution. Such projections would ideally be bias-corrected to account for climate model tendencies to systematically simulate historical conditions different than observed. In 2007, the U.S. Bureau of Reclamation, Santa Clara University and Lawrence Livermore National Laboratory (LLNL) collaborated to develop an archive of 112 bias-corrected and spatially disaggregated (BCSD) CMIP3 temperature and precipitation projections. These projections were generated using 16 CMIP3 models to simulate three emissions pathways (A2, A1b, and B1) from one or more initializations (runs). Projections are specified on a monthly time step from 1950-2099 and at 0.125 degree spatial resolution within the North American Land Data Assimilation System domain (i.e. contiguous U.S., southern Canada and northern Mexico). Archive data are freely accessible at LLNL Green Data Oasis (url). Since being launched, the archive has served over 3500 data requests by nearly 500 users in support of a range of planning, research and educational activities. Archive developers continue to look for ways to improve the archive and respond to user needs. One request has been to serve the intermediate datasets generated during the BCSD procedure, helping users to interpret the relative influences of the bias-correction and spatial disaggregation on the transformed CMIP3 output. This request has been addressed with intermediate datasets now posted at the archive web-site. Another request relates closely to studying hydrologic and ecological impacts under climate change, where users are asking for projected diurnal temperature information (e.g., projected daily minimum and maximum temperature) and daily time step resolution. In

  12. Characterisation of organic compounds in aerosol particles from a finnish forest by on-line coupled supercritical fluid extraction-liquid chromatography-gas chromatography-mass spectrometry

    Energy Technology Data Exchange (ETDEWEB)

    Shimmo, Masahiko; Jaentti, Jaana; Hartonen, Kari; Hyoetylaeinen, Tuulia; Riekkola, Marja-Liisa [Laboratory of Analytical Chemistry, Department of Chemistry, University of Helsinki, P.O. Box 55, 00014, Helsinki (Finland); Aalto, Pasi; Kulmala, Markku [Division of Atmospheric Sciences, Department of Physical Sciences, University of Helsinki, P.O. Box 64, 00014, Helsinki (Finland)

    2004-04-01

    During the European Union project Quantification of Aerosol Nucleation in the European Boundary Layer (QUEST), which began in spring 2003, atmospheric aerosol particles were collected in a Finnish Scots pine forest using a high-volume sampler. The organic compounds in the filter samples were then analysed by on-line coupled supercritical fluid extraction-liquid chromatography-gas chromatography-mass spectrometry (SFE-LC-GC-MS). The sample was first extracted by SFE. During LC the extracts were fractionated into three fractions according to polarity. The final separation was carried out by GC-MS. A fraction volume as high as 840 {mu}L was transferred to the GC, using the partial concurrent eluent evaporation technique. The same instrumentation, with an in-situ SFE derivatisation method, was used to analyse organic acids. Major compounds such as n-alkanes and PAH were analysed quantitatively. Their concentrations were lower than those usually observed in urban areas or in other forest areas in Europe. The wind direction was one of the most important factors affecting changes in the daily concentrations of these compounds. Scots pine needles were analysed with the same system to obtain reference data for identification of biogenic compounds in aerosol particles. Other organic compounds found in this study included hopanes, steranes, n-alkanals, n-alkan-2-ones, oxy-PAH, and alkyl-PAH; some biogenic products, including oxidation products of monoterpenes, were also identified. (orig.)

  13. THE HERSCHEL COMPREHENSIVE (U)LIRG EMISSION SURVEY (HERCULES): CO LADDERS, FINE STRUCTURE LINES, AND NEUTRAL GAS COOLING

    Energy Technology Data Exchange (ETDEWEB)

    Rosenberg, M. J. F.; Van der Werf, P. P.; Israel, F. P.; Meijerink, R. [Leiden Observatory, Leiden University, P.O. Box 9513, 2300 RA Leiden (Netherlands); Aalto, S. [Department of Earth and Space Sciences, Chalmers University of Technology, Onsala Observatory, SE-43994 Onsala (Sweden); Armus, L.; Díaz-Santos, T. [Spitzer Science Center, California Institute of Technology, MS 220-6, Pasadena, CA 91125 (United States); Charmandaris, V. [Institute for Astronomy, Astrophysics, Space Applications and Remote Sensing, National Observatory of Athens, P. Penteli, 15236 Athens (Greece); Evans, A. S. [Department of Astronomy, University of Virginia, P.O. Box 400325, Charlottesville, VA 22904 (United States); Fischer, J. [Naval Research Laboratory, Remote Sensing Division, 4555 Overlook Ave SW, Washington, DC 20375 (United States); Gao, Y. [Purple Mountain Observatory, Chinese Academy of Sciences (CAS), 2 West Beijing Road, Nanjing 210008 (China); González-Alfonso, E. [Departamento de Fsica y Matemáticas, Universidad de Alcalá, Campus Universitario, E-28871 Alcalá de Henares, Madrid (Spain); Greve, T. R. [Department of Physics and Astronomy, University College London, Gower Street, London WC1E 6BT (United Kingdom); Harris, A. I. [Department of Astronomy, University of Maryland, College Park, MD 20742 (United States); Henkel, C. [Max-Planck-Institut für Radioastronomie, Auf dem Hügel 16, Bonn, D-53121 (Germany); Isaak, K. G. [Scientific Support Office, ESTEC/SRE-S, Keplerlaan 1, NL-2201 AZ Noordwijk (Netherlands); Kramer, C., E-mail: rosenberg@strw.leidenuniv.nl [Instituto Radioastronomía Milimétrica (IRAM), Av. Divina Pastora 7, Nucleo Central, E-18012 Granada (Spain); and others

    2015-03-10

    (Ultra) luminous infrared galaxies ((U)LIRGs) are objects characterized by their extreme infrared (8-1000 μm) luminosities (L {sub LIRG} > 10{sup 11} L {sub ☉} and L {sub ULIRG} > 10{sup 12} L {sub ☉}). The Herschel Comprehensive ULIRG Emission Survey (PI: van der Werf) presents a representative flux-limited sample of 29 (U)LIRGs that spans the full luminosity range of these objects (10{sup 11} L {sub ☉} ≤ L {sub IR} ≤ 10{sup 13} L {sub ☉}). With the Herschel Space Observatory, we observe [C II] 157 μm, [O I] 63 μm, and [O I] 145 μm line emission with Photodetector Array Camera and Spectrometer, CO J = 4-3 through J = 13-12, [C I] 370 μm, and [C I] 609 μm with SPIRE, and low-J CO transitions with ground-based telescopes. The CO ladders of the sample are separated into three classes based on their excitation level. In 13 of the galaxies, the [O I] 63 μm emission line is self absorbed. Comparing the CO excitation to the InfraRed Astronomical Satellite 60/100 μm ratio and to far infrared luminosity, we find that the CO excitation is more correlated to the far infrared colors. We present cooling budgets for the galaxies and find fine-structure line flux deficits in the [C II], [Si II], [O I], and [C I] lines in the objects with the highest far IR fluxes, but do not observe this for CO 4 ≤ J {sub upp} ≤ 13. In order to study the heating of the molecular gas, we present a combination of three diagnostic quantities to help determine the dominant heating source. Using the CO excitation, the CO J = 1-0 linewidth, and the active galactic nucleus (AGN) contribution, we conclude that galaxies with large CO linewidths always have high-excitation CO ladders, and often low AGN contributions, suggesting that mechanical heating is important.

  14. Gas

    International Nuclear Information System (INIS)

    1996-01-01

    The French government has decided to modify the conditions of extension of local natural gas authorities to neighbouring districts. The European Union is studying the conditions of internal gas market with the objective of more open markets although considering public service requirements

  15. Discussion after implementation of possible ergonomics contributions in production lines automation project

    OpenAIRE

    José Adriano Canton; Andrea Regina Martins Fontes; Isaías Torres

    2016-01-01

    This paper addresses the issue of work spaces designed based on Activity-Centered Ergonomics. The aim was to reflect on the role of Ergonomics in the design of productive situations in order to anticipate and mitigate the emergence of new constraints. This study was developed using a case study from the packaging industry, where an automated line was implemented to mitigate the injuries suffered as result of the manual system. This article was based on the results of an Ergonomic Work Analysi...

  16. Generalising via the Case Studies and Adapting the Oil and Gas Industry's Project Execution Concepts to the Construction Industry

    OpenAIRE

    Mejlænder-Larsen, Øystein

    2015-01-01

    The aim of this paper is to explore whether it is possible to generalise findings on project execution in the oil and gas industryrelated to the use of project execution models and a 3D design environment, based on case study research. Besides, sufficientsimilarities between the two industries were assessed and the applicability of the findings from the cases in the oil and gasindustry was assessed. The selected cases (the ongoing ...

  17. Visualization of Sensory Neurons and Their Projections in an Upper Motor Neuron Reporter Line.

    Science.gov (United States)

    Genç, Barış; Lagrimas, Amiko Krisa Bunag; Kuru, Pınar; Hess, Robert; Tu, Michael William; Menichella, Daniela Maria; Miller, Richard J; Paller, Amy S; Özdinler, P Hande

    2015-01-01

    Visualization of peripheral nervous system axons and cell bodies is important to understand their development, target recognition, and integration into complex circuitries. Numerous studies have used protein gene product (PGP) 9.5 [a.k.a. ubiquitin carboxy-terminal hydrolase L1 (UCHL1)] expression as a marker to label sensory neurons and their axons. Enhanced green fluorescent protein (eGFP) expression, under the control of UCHL1 promoter, is stable and long lasting in the UCHL1-eGFP reporter line. In addition to the genetic labeling of corticospinal motor neurons in the motor cortex and degeneration-resistant spinal motor neurons in the spinal cord, here we report that neurons of the peripheral nervous system are also fluorescently labeled in the UCHL1-eGFP reporter line. eGFP expression is turned on at embryonic ages and lasts through adulthood, allowing detailed studies of cell bodies, axons and target innervation patterns of all sensory neurons in vivo. In addition, visualization of both the sensory and the motor neurons in the same animal offers many advantages. In this report, we used UCHL1-eGFP reporter line in two different disease paradigms: diabetes and motor neuron disease. eGFP expression in sensory axons helped determine changes in epidermal nerve fiber density in a high-fat diet induced diabetes model. Our findings corroborate previous studies, and suggest that more than five months is required for significant skin denervation. Crossing UCHL1-eGFP with hSOD1G93A mice generated hSOD1G93A-UeGFP reporter line of amyotrophic lateral sclerosis, and revealed sensory nervous system defects, especially towards disease end-stage. Our studies not only emphasize the complexity of the disease in ALS, but also reveal that UCHL1-eGFP reporter line would be a valuable tool to visualize and study various aspects of sensory nervous system development and degeneration in the context of numerous diseases.

  18. On-Line Investment Analysis and Portfolio Management: Using Learning Outcome Statements To Design Projects.

    Science.gov (United States)

    Pettijohn, James B.; Ragan, Gay A.; Ragan, Kent P.

    2003-01-01

    Describes an Internet-based project to familiarize students with online investment analysis and stock portfolio management. Outlines a process for writing learning outcomes that address three levels of cognition: knowledge/comprehension, application/analysis, and synthesis/evaluation. (SK)

  19. Functional design criteria radioactive liquid waste line replacement, Project W-087. Revision 3

    International Nuclear Information System (INIS)

    McVey, C.B.

    1994-01-01

    This document provides the functional design criteria for the 222-S Laboratory radioactive waste drain piping and transfer pipeline replacement. The project will replace the radioactive waste drain piping from the hot cells in 222-S to the 219-S Waste Handling Facility and provide a new waste transfer route from 219-S to the 244-S Catch Station in Tank Farms

  20. Managing for the triple bottom line in project-based learning

    CSIR Research Space (South Africa)

    Viljoen, NM

    2012-07-01

    Full Text Available Project-based learning is a popular engineering education approach that involves at least three stakeholders – students, faculty and an external client. But more often than not, one or more of these parties have to compromise their goals...

  1. The political economy of trans-Pakistan gas pipeline project: assessing the political and economic risks for India

    International Nuclear Information System (INIS)

    Pandian, S.

    2005-01-01

    There is a growing realisation among Indian policy makers to consider the import of natural gas to address India's growing energy demand. Among many policy options to import natural gas, Indo-Iran overland pipeline option is considered to be effective and economical in addressing India's long-term energy demands. Such a pipeline would have to traverse Pakistani territory thereby necessitating a role for Pakistan in the pipeline project. Though security guarantees have been offered, India refuses to entertain the role of Pakistan in the project for a fear of its energy supply being disrupted in case of a military conflict with Pakistan. This paper argues that gas pipeline project is not only aimed at addressing India's energy concerns but also to further its strategic objectives. This paper contends that India, Iran and Pakistan do not have shared objective to make the overland project a political and commercial reality. India's stakes in the overland pipeline project are high as India's economic interests in the pipeline project are not in congruence with the politico-economic and strategic objectives of Iran and Pakistan. (author)

  2. Estimating the financial risks of Andropogon gayanus to greenhouse gas abatement projects in northern Australia

    Science.gov (United States)

    Adams, Vanessa M.; Setterfield, Samantha A.

    2013-06-01

    Financial mechanisms such as offsets are one strategy to abate greenhouse gas emissions, and the carbon market is expanding with a growing demand for offset products. However, in the case of carbon offsets, if the carbon is released due to intentional or unintentional reversal through environmental events such as fire, the financial liability to replace lost offsets will likely fall on the provider. This liability may have implications for future participation in programmes, but common strategies such as buffer pool and insurance products can be used to minimize this liability. In order for these strategies to be effective, an understanding of the spatial and temporal distributions of expected reversals is needed. We use the case study of savanna burning, an approved greenhouse gas abatement methodology under the Carbon Farming Initiative in Australia, to examine potential risks to carbon markets in northern Australia and quantify the financial risks. We focus our analysis on the threat of Andropogon gayanus (gamba grass) to savanna burning due to its documented impacts of increased fuel loads and altered fire regimes. We assess the spatial and financial extent to which gamba grass poses a risk to savanna burning programmes in northern Australia. We find that 75% of the eligible area for savanna burning is spatially coincident with the high suitability range for gamba grass. Our analysis demonstrates that the presence of gamba grass seriously impacts the financial viability of savanna burning projects. For example, in order to recuperate the annual costs of controlling 1 ha of gamba grass infestation, 290 ha of land must be enrolled in annual carbon abatement credits. Our results show an immediate need to contain gamba grass to its current extent to avoid future spread into large expanses of land, which are currently profitable for savanna burning.

  3. Estimating the financial risks of Andropogon gayanus to greenhouse gas abatement projects in northern Australia

    International Nuclear Information System (INIS)

    Adams, Vanessa M; Setterfield, Samantha A

    2013-01-01

    Financial mechanisms such as offsets are one strategy to abate greenhouse gas emissions, and the carbon market is expanding with a growing demand for offset products. However, in the case of carbon offsets, if the carbon is released due to intentional or unintentional reversal through environmental events such as fire, the financial liability to replace lost offsets will likely fall on the provider. This liability may have implications for future participation in programmes, but common strategies such as buffer pool and insurance products can be used to minimize this liability. In order for these strategies to be effective, an understanding of the spatial and temporal distributions of expected reversals is needed. We use the case study of savanna burning, an approved greenhouse gas abatement methodology under the Carbon Farming Initiative in Australia, to examine potential risks to carbon markets in northern Australia and quantify the financial risks. We focus our analysis on the threat of Andropogon gayanus (gamba grass) to savanna burning due to its documented impacts of increased fuel loads and altered fire regimes. We assess the spatial and financial extent to which gamba grass poses a risk to savanna burning programmes in northern Australia. We find that 75% of the eligible area for savanna burning is spatially coincident with the high suitability range for gamba grass. Our analysis demonstrates that the presence of gamba grass seriously impacts the financial viability of savanna burning projects. For example, in order to recuperate the annual costs of controlling 1 ha of gamba grass infestation, 290 ha of land must be enrolled in annual carbon abatement credits. Our results show an immediate need to contain gamba grass to its current extent to avoid future spread into large expanses of land, which are currently profitable for savanna burning. (letter)

  4. A new cognitive rehabilitation programme for patients with multiple sclerosis: the 'MS-line! Project'.

    Science.gov (United States)

    Gich, Jordi; Freixenet, Jordi; Garcia, Rafael; Vilanova, Joan Carles; Genís, David; Silva, Yolanda; Montalban, Xavier; Ramió-Torrentà, Lluís

    2015-09-01

    Cognitive rehabilitation is often delayed in multiple sclerosis (MS). To develop a free and specific cognitive rehabilitation programme for MS patients to be used from early stages that does not interfere with daily living activities. MS-line!, cognitive rehabilitation materials consisting of written, manipulative and computer-based materials with difficulty levels developed by a multidisciplinary team. Mathematical, problem-solving and word-based exercises were designed. Physical materials included spatial, coordination and reasoning games. Computer-based material included logic and reasoning, working memory and processing speed games. Cognitive rehabilitation exercises that are specific for MS patients have been successfully developed. © The Author(s), 2014.

  5. Mineral and chemical composition of rock core and surface gas composition in Horonobe Underground Research Laboratory project. Phase 1

    International Nuclear Information System (INIS)

    Hiraga, Naoto; Ishii, Eiichi

    2008-02-01

    The following three kinds of analyses were conducted for the 1st phase of the Horonobe Underground Research Laboratory Project. Mineral composition analysis of core sample. Whole rock chemical composition analysis of core sample. Surface gas composition analysis. This document summarizes the results of these analyses. (author)

  6. Medium-Term Gas Market Report 2013: Market Trends and Projections to 2018

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-06-01

    Global growth in natural gas use slowed measurably in 2012, although it still exceeded that of oil and total energy use. Among the headwinds facing gas are continuing weak demand in Europe, resilience of coal in North America as well as persistent bottlenecks and disruptions in the LNG value chain that in 2012 caused an exceptional global decline of LNG supply. At the same time, Asian demand for gas remains red-hot, and gas is beginning to gain traction as a transport fuel. The IEA new Medium-Term Gas Market Report provides a detailed analysis of demand, upstream investment and trade developments through 2018 that will shape the gas industry and the role of gas in the global energy system. Its special sections investigate the economic viability of gas-fired power generation in Europe, the prospects for an LNG trading hub in Asia as well as the potentially transformational role of natural gas in transport. Amid a continuous regional divergence between North American abundance, European weakness and Asian thirst for LNG, the 2013 Medium Term Gas Market Report will investigate the key questions that the gas industry faces. These include the prospect of the United States becoming a major gas exporter, the challenges of securing enough gas to meet China’s growth, and the ability of Russian gas – spurred both by weak EU demand and resurgent domestic production – to find its manifest destiny in Asia.

  7. Field line projections of 6300 AA auroral emissions into the outer magnetosphere

    International Nuclear Information System (INIS)

    Shepherd, M.M.

    1979-07-01

    An empirical magnetospheric model is employed to project auroral intensity boundaries into the magnetosphere. The auroral data are in the form of instantaneous maps of 6300AA emission, acquired with the ISIS-II spacecraft and correspond to fluxes of low energy electrons. These are specific to a particular universal time and date. The magnetospheric model used is a purely empirical one, designed by Mead and Fairfield (1975) from 44.76 x 10 6 magnetic measurements made by 4 IMP satellites. Their model includes the dipole tilt as a variable, and permits selection from four different disturbance levels, so is particularly suited to these data. In a general way, the auroral projections agree with what is expected, giving some confidence in this application of the model. But a number of features appear that were not predicted, and which should permit new insights into the relationship of specific auroral boundaries to the structure of the magnetosphere. (author)

  8. On-line monitoring of trace compounds in the flue gas of an incineration pilot plant: Formation of polycyclic aromatic hydrocarbons

    International Nuclear Information System (INIS)

    Heger, H. J.; Zimmermann, R.; Dorfner, R.; Kettrup, A.; Boesl, U.

    1998-01-01

    Laser mass spectrometry is applied for on-line analysis of PAHs from a complex flue gas matrix in the combustion chamber of an incineration plant. Process monitoring of industrial processes can be performed. New insights into the formation of toxic combustion byproducts are possible

  9. Quantitative analysis of higher hydrocarbons in natural gas using coupled solid-phase extraction / supercritiacal fluid extraction with on-line GC analysis

    NARCIS (Netherlands)

    Janssen, J.G.M.; Cramers, C.A.M.G.; Meulen-Kuijk, van der L.; Smit, A.L.C.; Sandra, P.; Devos, G.

    1993-01-01

    Characterisation of natural gas with respect to the hydrocarbon content is a challenging analytical problem due to the extremely low concentrations and the complexity of the matrix. In this publication a method is described for fully on-line preconcentration and analysis of n-nonane and higher

  10. Transformation kinetics of chlorinated ethenes by Methylosinus trichosporium OB3b and detection of unstable epoxides by on-line gas chromatography

    NARCIS (Netherlands)

    van Hylckama Vlieg, Johan. E.T.; Koning, Wim de; Janssen, Dick B.

    A rapid and accurate method for the determination of transformation kinetics of volatile organic substrates was developed. Concentrations were monitored by on-line gas chromatographic analysis of the headspace of well-mixed incubation mixtures. With this method, the kinetics of transformation of a

  11. Data correlation in on-line solid-phase extraction-gas chromatography-atomic emission/mass spectrometric detection of unknown microcontaminants

    NARCIS (Netherlands)

    Hankemeier, Th.; Rozenbrand, J.; Abhadur, M.; Vreuls, J.J.; Brinkman, U.A.Th.

    1998-01-01

    A procedure is described for the (non-target) screening of hetero-atom-containing compounds in tap and waste water by correlating data obtained by gas chromatography (GC) using atomic emission (AED) and mass selective (MS) detection. Solid-phase extraction (SPE) was coupled on-line to both GC

  12. Experience with an on-line computer for controlling and optimizing the gas supply and the application of various peak-load supply plants of a public utility

    Energy Technology Data Exchange (ETDEWEB)

    Poll, J [Technische Werke der Stadt Stuttgart A.G. (Germany, F.R.)

    1977-02-01

    The computer system has the following tasks: 1) On-line control; 2) supply of an information system; 3) performance of a gas marketing forecast; 4) background computations. Measured data are compiled, processed, monitored, recorded, prepared, and stored. The process is controlled by about a dozen programmes, the remaining tasks are taken over by 22 programmes. The system has proved a success.

  13. The Challenge of Interfacing the Primary Beam Lines for the AWAKE Project at CERN

    CERN Document Server

    Bracco, C; Gschwendtner, E; Meddahi, M; Petrenko, A; Velotti, FM

    2014-01-01

    The Proton Driven Plasma Wakefield Acceleration Experiment (AWAKE) at CERN foresees the simultaneous operation of a proton, a laser and an electron beam. The first stage of the experiment will consist in proving the self-modulation, in the plasma, of a long proton bunch into micro-bunches. The success of this experiment requires an almost perfect concentricity of the proton and laser beam, over the full length of the plasma cell. The complexity of integrating the laser into the proton beam line and fulfilling the strict requirements in terms of pointing precision of the proton beam at the plasma cell are described. The second stage of the experiment foresees also the injection of electron bunches to probe the accelerating wakefields driven by the proton beam. Studies were performed to evaluate the possibility of injecting the electron beam parallel and with an offset to the beam axis. This option would imply that protons and electrons will have to share the last few meters of a common beam line. Issues and po...

  14. Financial and tax risks at implementation of ''Chayanda- Lensk'' section of ''Sila Sibiri'' gas transportation system construction project

    International Nuclear Information System (INIS)

    Sharf, I V; Chukhareva, N V; Kuznetsova, L P

    2014-01-01

    High social and economic importance of large-scale projects on gasification of East Siberian regions of Russia and diversifying gas exports poses the problem of complex risk analysis of the project. This article discusses the various types of risks that could significantly affect the timing of the implementation and effectiveness of the project for the construction of the first line of ''Sila Sibiri'', the ''Chayanda-Lensk'' section. Special attention is paid to financial and tax aspects of the project. Graphically presented analysis of the dynamics of financial indicators reflect certain periods of effectiveness in implementing the project. Authors also discuss the possible causes and consequences of risks

  15. Ejecta Particle-Size Measurements in Vacuum and Helium Gas using Ultraviolet In-Line Fraunhofer Holography

    Energy Technology Data Exchange (ETDEWEB)

    Sorenson, Danny S. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Pazuchanics, Peter [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Johnson, Randall P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Malone, R. M. [National Security Technologies, LLC. (NSTec), Los Alamos, NM (United States); Kaufman, M. I. [National Security Technologies, LLC. (NSTec), Los Alamos, NM (United States); Tibbitts, A. [National Security Technologies, LLC. (NSTec), Los Alamos, NM (United States); Tunnell, T. [National Security Technologies, LLC. (NSTec), Los Alamos, NM (United States); Marks, D. [National Security Technologies, LLC. (NSTec), Los Alamos, NM (United States); Capelle, G. A. [National Security Technologies, LLC. (NSTec), Santa Barbara, CA (United States); Grover, M. [National Security Technologies, LLC. (NSTec), Santa Barbara, CA (United States); Marshall, B. [National Security Technologies, LLC. (NSTec), Santa Barbara, CA (United States); Stevens, G. D. [National Security Technologies, LLC. (NSTec), Santa Barbara, CA (United States); Turley, W. D. [National Security Technologies, LLC. (NSTec), Santa Barbara, CA (United States); LaLone, B. [National Security Technologies, LLC. (NSTec), Santa Barbara, CA (United States)

    2014-06-25

    An Ultraviolet (UV) in-line Fraunhofer holography diagnostic has been developed for making high-resolution spatial measurements of ejecta particles traveling at many mm/μsec. This report will discuss the development of the diagnostic including the high-powered laser system and high-resolution optical relay system. In addition, the system required to reconstruct the images from the hologram and the corresponding analysis of those images to extract particles will also be described. Finally, results from six high-explosive (HE), shock-driven Sn ejecta experiments will be presented. Particle size distributions will be shown that cover most of the ejecta velocities for experiments conducted in a vacuum, and helium gas environments. In addition, a modification has been made to the laser system that produces two laser pulses separated by 6.8 ns. This double-pulsed capability allows a superposition of two holograms to be acquired at two different times, thus allowing ejecta velocities to be measured directly. Results from this double pulsed experiment will be described.

  16. Europe's gas imports via pipelines. Projects and safety aspects; Europas Gasimporte durch Pipelines. Projekte und Sicherheitsaspekte

    Energy Technology Data Exchange (ETDEWEB)

    Goetz, R.

    2008-08-15

    By the year 2030 Europe's gas imports will have risen to approximately 200 bn m{sup 3}, necessitating the installation of new pipelines and LNG terminals. The largest growth in imports is not expected from Russia but from Africa and the Near East. An analysis of projected pipelines demonstrates these regions' contribution to securing Europe's gas supply. Because they help to establish market dominance or to fend off potential competitors these pipelines also serve corporate strategies. The most reliable supply will continue to come from Norway. By contrast, gas imports via pipelines from North Africa, Russia and the Persian Gulf all carry high risks of approximately the same degree. The greatest risks are associated with gas imports from the Caspian Sea.

  17. Presenting a Model Based on Fuzzy Application to Optimize the Time of IBS Projects in Gas Refineries

    Directory of Open Access Journals (Sweden)

    Naderpour Abbas

    2017-01-01

    Full Text Available Nowadays, the construction industry has started to embrace IBS as a method of attaining better construction quality and productivity and reducing risks related to occupational safety and health. The built of pre-fabricated component in factories reduces many problems related to lack of purposing uncertainty in scheduling calculation and time management of projects. In the case of using IBS method for managing time in projects, former studies such as Allan Tay’s research, indicates that this method can save up at least 29% of overall completion period versus the conventional method. But beside mentioned advantages of this technical method, the projects could be optimized more and more in scheduling calculations. This issue is critical in gas refineries, since special parameters such as risk of spreading poison H2S gas and mandatory of performing projects in short time period events such as maintenance overhauls demands to perform projects in optimum time. Custom scheduling calculation of project planning uses the Critical Path Method (CPM as a tool for Planning Project’s activities. The researches of this paper’s authors indicated that Fuzzy Critical Path Method (FCPM is the best technique to manage the uncertainty in project scheduling and can save up the construction project’s time versus the custom methods. This paper aims to present a model based on fuzzy application in CPM calculations to optimize the time of Industrial Building System.

  18. The ATCA CABB Line Survey on Centaurus A: Properties of the Molecular Gas from the Dust Lanes to the Central Engine

    Science.gov (United States)

    Ott, Juergen; Koribalski, Baerbel; Henkel, Christian; Edwards, Philip; Norris, Ray; Meier, David; Feain, Ilana; Curran, Steve; Martin-Pintado, Jesus; Beelen, Alexandre; Aalto, Susanne; Combes, Francoise; Israel, Frank; Muller, Sebastien; Espada, Daniel; Guelin, Michel; Black, John Harry; V-Trung, Dinh; Impellizzeri, Caterina M. V.; Persson, Carina

    2011-10-01

    Centaurus A with its host NGC5128 is the most nearby radio galaxy. Its molecular spectrum exhibits three prominent features: a) gas that is located in the outer disk and dust lanes, b) absorption lines that are supposedly close to the central AGN, and c) gas in emission from the nucleus. We propose to perform an extensive line survey toward CenA using the exciting new capabilities of CABB. The broad basebands and narrow zoom bands of CABB are ideal to capture the full breath of the CenA spectral features. Our multi-band line observations will allow us to derive the exact physical conditions of each component as well as the chemistry involved. We will therefore obtain a comprehensive view of the physics imprinted on the molecular spectrum of a radio galaxy and its host, reaching from the central supermassive black hole, through the accretion region and the inner disk to the outer dust lanes.

  19. Baseline greenhouse gas emissions for the lower Churchill hydroelectric generation project in Labrador

    International Nuclear Information System (INIS)

    LeDrew, L.; Bastien, J.; Tremblay, A.

    2007-01-01

    Newfoundland and Labrador Hydro has proposed to develop the hydroelectric potential of the lower Churchill River by constructing generating facilities at Gull Island and Muskrat Falls. This paper presented the results of a study that was conducted to collect baseline data on greenhouse gas (GHG) fluxes/emissions of carbon dioxide (CO 2 ), methane (CH 4 ) and nitrous oxide (N 2 O) from the lower Churchill River, Smallwood reservoir, and natural lakes in the upper and lower Churchill regions. The purpose of the study was to compare GHG fluxes between the lower Churchill River, Smallwood reservoir and those of the nearby natural lakes and to compare GHG fluxes between the Smallwood reservoir and those of boreal reservoirs in northern Quebec. The paper provided a description of the site and the methodology for GHG flux measurement. The results and discussion focused on physical-chemical variables and GHG fluxes. The study results were to be used in the environmental assessment of the project. It was concluded that the lower Churchill River has higher CO 2 fluxes and lower CH 4 fluxes than the Smallwood reservoir and higher CO 2 fluxes than natural lakes in the region. There was no significant difference in N 2 O fluxes between the sampled waterbodies. Both CO 2 and CH 4 fluxes from the lower Churchill River were comparable to other Canadian reservoirs. 12 refs., 2 tabs., 6 figs

  20. Advanced Flue Gas Desulfurization (AFGD) Demonstration Project, A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2001-01-01

    The AFGD process as demonstrated by Pure Air at the Bailly Station offers a reliable and cost-effective means of achieving a high degree of SO(sub 2) emissions reduction when burning high-sulfur coals. Many innovative features have been successfully incorporated in this process, and it is ready for widespread commercial use. The system uses a single-loop cocurrent scrubbing process with in-situ oxidation to produce wallboard-grade gypsum instead of wet sludge. A novel wastewater evaporation system minimizes effluents. The advanced scrubbing process uses a common absorber to serve multiple boilers, thereby saving on capital through economies of scale. Major results of the project are: (1) SO(sub 2) removal of over 94 percent was achieved over the three-year demonstration period, with a system availability exceeding 99.5 percent; (2) a large, single absorber handled the combined flue gas of boilers generating 528 MWe of power, and no spares were required; (3) direct injection of pulverized limestone into the absorber was successful; (4) Wastewater evaporation eliminated the need for liquid waste disposal; and (5) the gypsum by-product was used directly for wallboard manufacture, eliminating the need to dispose of waste sludge

  1. An on-line communication system as an international catalysator for initiating storage projects

    International Nuclear Information System (INIS)

    Hennig, E.; Stephanblome, Th.

    1998-01-01

    The presented internet platform realizes an international contact stock of the companies and institutes being interested in storage technologies and cooperation and will take over the function of a catalysator for the planning of future storage use. In this regard the system creates an information and marketing device that will help, in the shape of an international, virtual exhibition hall, to find new markets, that are interesting for producers and suppliers of electrical energy storage technologies. In this virtual exhibition hall, need and offer regarding the electrical energy storage technologies are shown in order to support the main aim of the works regarding Annex IX, the starting of concrete projects. (author)

  2. Molecular Line Emission as a Tool for Galaxy Observations (LEGO). I. HCN as a tracer of moderate gas densities in molecular clouds and galaxies

    Science.gov (United States)

    Kauffmann, Jens; Goldsmith, Paul F.; Melnick, Gary; Tolls, Volker; Guzman, Andres; Menten, Karl M.

    2017-09-01

    Trends observed in galaxies, such as the Gao & Solomon relation, suggest a linear relationship between the star formation rate and the mass of dense gas available for star formation. Validation of such trends requires the establishment of reliable methods to trace the dense gas in galaxies. One frequent assumption is that the HCN (J = 1-0) transition is unambiguously associated with gas at H2 densities ≫ 104 cm-3. If so, the mass of gas at densities ≫ 104 cm-3 could be inferred from the luminosity of this emission line, LHCN (1-0). Here we use observations of the Orion A molecular cloud to show that the HCN (J = 1-0) line traces much lower densities 103 cm-3 in cold sections of this molecular cloud, corresponding to visual extinctions AV ≈ 6 mag. We also find that cold and dense gas in a cloud like Orion produces too little HCN emission to explain LHCN (1-0) in star forming galaxies, suggesting that galaxies might contain a hitherto unknown source of HCN emission. In our sample of molecules observed at frequencies near 100 GHz (also including 12CO, 13CO, C18O, CN, and CCH), N2H+ is the only species clearly associated with relatively dense gas.

  3. Collecting lessons learned : How project-based organizations in the oil and gas industry learn from their projects

    NARCIS (Netherlands)

    Buttler, T.

    2016-01-01

    Project-based organizations collect lessons learned in order to improve the performance of projects. They aim to repeat successes by using positive lessons learned, and to avoid repeating negative experiences by using negative lessons learned. Cooke-Davies (2002) claimed that the ability to learn

  4. National Assessment of Oil and Gas Project: Areas of Historical Oil and Gas Exploration and Production in the United States

    Science.gov (United States)

    Biewick, Laura

    2008-01-01

    This report contains maps and associated spatial data showing historical oil and gas exploration and production in the United States. Because of the proprietary nature of many oil and gas well databases, the United States was divided into cells one-quarter square mile and the production status of all wells in a given cell was aggregated. Base-map reference data are included, using the U.S. Geological Survey (USGS) National Map, the USGS and American Geological Institute (AGI) Global GIS, and a World Shaded Relief map service from the ESRI Geography Network. A hardcopy map was created to synthesize recorded exploration data from 1859, when the first oil well was drilled in the U.S., to 2005. In addition to the hardcopy map product, the data have been refined and made more accessible through the use of Geographic Information System (GIS) tools. The cell data are included in a GIS database constructed for spatial analysis via the USGS Internet Map Service or by importing the data into GIS software such as ArcGIS. The USGS internet map service provides a number of useful and sophisticated geoprocessing and cartographic functions via an internet browser. Also included is a video clip of U.S. oil and gas exploration and production through time.

  5. Project and implementation of advanced controls in a natural gas reformation unit; Projeto e implementacao de controles avancados em unidade de reforma de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Andreoni, Bruno [Andreoni Servicos de Engenharia Ltda., Rio de Janeiro, RJ (Brazil); Bueno, Roberto Galvao [Prosint S.A., XX (Brazil); Cruz, Luiz Alfredo A [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia

    1993-12-31

    This paper presents an effective implementation of advanced controls using a DCS previously loaded with conventional controls only. The advanced control system for a multiple fuel natural gas reform furnace consists of material and energy on-line balances, multivariable feedback trims, dynamic compensations and adaptive controls. The system performed well without an analyzer despite wide variations in fuel composition. A few items were implemented to improve the system after startup of the original strategies. All implementations were made possible through great involvement of plant personnel, aided by a consulting firm. The system provided tangible benefits and adequate return on the investment. (author)

  6. The role of Project Finance in the viability of infrastructure projects: case of the petroleum and natural gas sector

    International Nuclear Information System (INIS)

    Faria, Viviana Cardoso de Sa e; Rodrigues, Adriano Pires

    2000-01-01

    Project finance represents neither recent news nor a panacea in the fields of long term financing. It is not able to solve the chronicle scarcity of resources applied in big projects financing in developing countries. In fact, underdeveloped markets as the Brazilian one offer, at the beginning, almost no chances to the project finance solution. In this case a path full of barriers overcome the solutions that project finance may offer. The process to adapt this instrument to the Brazilian reality presents the following hindrances: a different law framework, capital market underdevelopment; economical instability; political and regulating risks; incapability of the national insurance companies to insure big projects; cultural differences and lack of know-how in this area, and lastly, the out of date tax system. (author)

  7. Charge Sensitive Amplifier (CSA) in cold gas of Liquid Argon (LAr) Time Projection Chamber (TPC)

    International Nuclear Information System (INIS)

    Bechetoille, E; Mathez, H; Zoccarato, Y

    2011-01-01

    This paper presents our work on a 8-channel low noise Front-End electronic coupled to a Liquid Argon (LAr) TPC (Time Projection Chamber). Each channel consists of a Charge Sensitive Amplifier (CSA), a band pass filter and a 50 Ohms buffer as line driver. A serial link based on a 'i2c-like' protocol, provides multiple configuration features to the circuit by accessing slow control registers. In this paper, we describe the CSA, the shaper and the slow control part. The feedback network of the CSA is made of a capacitance and a resistor. Their values are respectively 250 fF and 4 MΩ. An input referred noise of, at most, 1500 e- rms must be achieved at -100 deg. C with an input detector capacitance of 250 pF to ensure a correct measurement of the minimal signal of 18000e- (2.88 fC). The power consumption in this cryogenic setup must be less than 40 mW from a 3.3 V power supply.

  8. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM: A Case-Study on Oil and Gas Projects, the Piping Process

    Directory of Open Access Journals (Sweden)

    Sung-Hwan Jo

    2018-05-01

    Full Text Available Engineering, Procurement, and Construction (EPC of oil and gas megaprojects often experience cost overruns due to substantial schedule delays. One of the greatest causes of these overruns is the mismanagement of the project schedule, with the piping works (prefabrication and installation occupying a majority of that schedule. As such, an effective methodology for scheduling, planning, and controlling of piping activities is essential for project success. To meet this need, this study used the Critical Chain Project Management (CCPM to develop a piping construction delay prevention methodology, incorporating material procurement processes for EPC megaprojects. Recent studies indicate that the traditional scheduling method used on oil and gas mega projects has critical limitations regarding resource scarcity, calculation of activity duration, and dealing with uncertainties. To overcome these limitations, the Theory of Constraints-based CCPM was proposed and implemented to provide schedule buffers management. Nonexistent in literature, and of critical importance, is this paper’s focus on the resource buffer, representing material uncertainty and management. Furthermore, this paper presents a step-by-step process and flow chart for project, construction, and material managers to effectively manage a resource buffer through the CCPM process. This study extends the knowledge of traditional resource buffers in CCPM to improve material and procurement management, thus avoiding the shortage of piping materials and minimizing delays. The resultant process was validated by both deterministic and probabilistic schedule analysis through two case studies of a crude pump unit and propylene compressor installation at a Middle Eastern Refinery Plant Installation. The results show that the CCPM method effectively handles uncertainty, reducing the duration of piping works construction by about a 35% when compared to the traditional method. Furthermore, the

  9. Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1990-07-01

    The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

  10. Project baselines and boundaries for project-based GHG emission reduction trading : a report to the Greenhouse Gas Emission Trading Pilot Program

    Energy Technology Data Exchange (ETDEWEB)

    Lazarus, M.; Kartha, S.; Bernow, S. [Tellus Inst., Boston, MA (United States)

    2001-04-01

    One of the great challenges for policy makers in the twenty first century is turning out to be global climate change caused by greenhouse gas emissions. Recent setbacks in international negotiations do not preclude the imposition of national emission targets. One option being studied to increase the economic efficiency of meeting these targets is the creation of emissions trading markets. The exploration of credit trading in the field of greenhouse gas emissions is carried out under the banner of the Greenhouse Gas Emission Reduction Trading (GERT) Pilot Project. One of its objectives is the development of the institutional framework required for the Clean Development Mechanism (CDM), Joint Implementation (JI), and other international credit trading programs. To ensure credits are awarded to projects in a fair and transparent manner, technical, methodological, and administrative processes must be put in place. The determination of project baselines and project boundaries represent two of the main challenges confronting policy makers in awarding the credits. A review of baseline and boundary methods was initiated by GERT, and this report also contains a description of the main advantages and drawbacks of the various methods being considered. Lessons learned and opportunities are especially important for GERT to provide proper guidance to developers. The context and rationale for baselines and boundary setting are first explored in this report, as well as the issues of importance, and common criteria for the evaluation of alternative methods. The principal options for baseline determination, advantages and disadvantages, and applicability in various contexts were reviewed in section 2. The topic of avoided electricity use, and how to set consistent baselines for it are discussed in section 3. Project boundary is the topic of section 4, including leakage, upstream and downstream emissions, rebound and positive spillover effects, and means by which these issues can de

  11. Using the van der Waals broadening of spectral atomic lines to measure the gas temperature of an argon-helium microwave plasma at atmospheric pressure

    International Nuclear Information System (INIS)

    Munoz, J.; Dimitrijevic, M.S.; Yubero, C.; Calzada, M.D.

    2009-01-01

    The applications of plasmas generated with gas mixtures have become increasingly common in different scientific and technological fields. In order to understand the advantages of these discharges, for instance in chemical analysis, it is necessary to know the gas temperature (T g , kinetic energy of the heavy particles) since it has a great influence on the atomization reactions of the molecules located in the discharge, along with the dependence of the reaction rate on this parameter. The ro-vibrational emission spectra of the molecular species are usually used to measure the gas temperature of a discharge at atmospheric pressure although under some experimental conditions, these are difficult to detect. In such cases, the gas temperature can be determined from the van der Waals broadening of the emitted atomic spectral lines related to this parameter. The method proposed is based on the van der Waals broadening taking into account two perturbers

  12. On-Line Fuel Failure Monitor for Fuel Testing and Monitoring of Gas Cooled Very High Temperature Reactors

    International Nuclear Information System (INIS)

    Hawari, Ayman I.; Bourham, Mohamed A.

    2010-01-01

    Very High Temperature Reactors (VHTR) utilize the TRISO microsphere as the fundamental fuel unit in the core. The TRISO microsphere (∼ 1-mm diameter) is composed of a UO2 kernel surrounded by a porous pyrolytic graphite buffer, an inner pyrolytic graphite layer, a silicon carbide (SiC) coating, and an outer pyrolytic graphite layer. The U-235 enrichment of the fuel is expected to range from 4%-10% (higher enrichments are also being considered). The layer/coating system that surrounds the UO2 kernel acts as the containment and main barrier against the environmental release of radioactivity. To understand better the behavior of this fuel under in-core conditions (e.g., high temperature, intense fast neutron flux, etc.), the US Department of Energy (DOE) is launching a fuel testing program that will take place at the Advanced Test Reactor (ATR) located at Idaho National Laboratory (INL). During this project North Carolina State University (NCSU) researchers will collaborate with INL staff for establishing an optimized system for fuel monitoring for the ATR tests. In addition, it is expected that the developed system and methods will be of general use for fuel failure monitoring in gas cooled VHTRs.

  13. Survey report for fiscal 1999. Project of diffusing gas driven cooling systems in Oman; 1999 nendo Oman koku ni okeru gas reibo fukyu jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    With the clean development mechanism (CDM) borne in mind, a study is made about the diffusion of gas driven cooling systems in Oman. The project under study aims to replace the motor driven turbo cooling systems, now in use at the Royal Hospital and other buildings in various areas, with gas driven cooling systems. It is then found that, when the Royal Hotel is equipped with such systems, energy will be saved by 1,855 tons/year in terms of oil, and greenhouse gas reduced by 5,129 tons/year in terms of CO2. When the Royal Hospital and other large buildings with heavy cooling loads, situated at or near the center of Muscat City and in the vicinity of the existing natural gas pipelines, are taken into account, energy will be saved by 13,049 tons/year in terms of oil and greenhouse gas will be reduced by 31,636 tons/year in terms of CO2, thanks to the presence of universities, hotels, and a sector occupied by government offices. As for the time necessary for investment recovery, it will be 4.7-5.3 years in case the investment does not cover a gas decompression station construction cost and 6.2-6.8 years in case it covers such. The new system will cost 7% less than the existing system. When a comparison is made in terms of electricity charges, the new system will be 30% lower than the existing system. The Omani Government is critical of a plan for allowing Japan to establish there an energy supply company (financed by Japan). (NEDO)

  14. Controlled Landfill Project in Yolo County, California for Environmental Benefits of Waste Stabilization and Minimization of Greenhouse Gas Emissions

    Science.gov (United States)

    Yazdani, R.; Augenstein, D.; Kieffer, J.; Cohen, K.

    2003-12-01

    The Department of Public Works of Yolo County, California, USA has been testing an advanced approach to landfill bioreactors, controlled (or "enhanced") landfilling, at its Yolo County Central Landfill site near Davis, CA, since 1994. Overall objectives have been the management of waste landfilling for: (1) rapid completion of total gas generation; (2) maximum, high-efficiency gas capture; (3) waste volume reduction; and (4) maximum greenhouse gas and carbon sequestration benefits. Methane generation is controlled and enhanced through carefully managed moisture additions, and by taking advantage of landfill temperature elevation. The generated landfill methane, an important greenhouse gas, is recovered with high efficiency through extraction from a porous recovery layer beneath a surface geomembrane cover. Instrumentation included a total of 56 moisture and 15 temperature sensors in the two cells, gas flow monitoring by positive displacement gas meters, and accurate quantification of liquid inputs and outputs. Gas composition, waste volume reduction, base hydrostatic head, and a range of environmental compliance parameters has been monitored since 1995. Partitioning gas tracer tests using the injection of two gases at dilute concentrations in the landfill have also been initiated to compute the fraction of pore space occupied by water between the points of tracer injection and tracer measurement. There has been rapid waste volume reduction in the enhanced cell that corresponds to the solids' reduction to gas. Monitoring is planned for the next several years, until stabilization parameters are determined complete. Encouraging performance is indicated by: (1) sensor data; (2) gas generation results; (3) data from landfill cores; and (4) decomposition-related indicators including rapid volume reduction. When data are synthesized, project results have attractive implications for new approaches to landfill management. Over seven-years, methane recoveries have averaged

  15. The Process of Risk Management for a Project to Extract Shale Gas

    Energy Technology Data Exchange (ETDEWEB)

    Hurtado, A.; Eguilior, S.; Recreo, F.

    2014-07-01

    There is no human activity without risk. Accordingly, so neither is the extraction of shale gas. In fact this technology has a risk level similar to any other type of industrial activity and particularly those related to oil and gas industry. It is important to highlight the need to properly address these risks, among other reasons, for its influence on public acceptance of this technology, a key element for the commercial scale implementation. At present, risk management is a generally accepted tool for decision making and control of the risks that come from a wide variety of both industrial and not industrial human activities. It is an important element for the implementation of a large number of safety regulations, corporate policies and good industry practice . Thus, for example, chemical and petroleum, nuclear industries, aviation and aerospace or waste management make use of risk management as a central tool to identification the risks, to establish the importance and ranking of the estimated risks, to estimate the cost/benefit ratio in reducing these risks, and to carry out political and institutional processes to manage them. Risk management provides a broad framework to aid decision-making through the identification, analysis, and evaluation and control of risks, including, of course, those for health and safety. A key aspect is the need to ensure the identification of all significant risks, from which it may take appropriate measures (risk analysis). An unidentified risk allows or evaluation or its monitoring, reduction, acceptance or cancellation. After the analysis stage it may be considered for assessment, that is, the risk quantification, to classify them (acceptable, unacceptable, etc. risk). These actions are determined based on a balance between risk control strategies, their effectiveness and cost, and the needs, problems and concerns of those who may be affected, or stake holders, an essential element in the strategic planning of any activity or

  16. The Process of Risk Management for a Project to Extract Shale Gas

    International Nuclear Information System (INIS)

    Hurtado, A.; Eguilior, S.; Recreo, F.

    2014-01-01

    There is no human activity without risk. Accordingly, so neither is the extraction of shale gas. In fact this technology has a risk level similar to any other type of industrial activity and particularly those related to oil and gas industry. It is important to highlight the need to properly address these risks, among other reasons, for its influence on public acceptance of this technology, a key element for the commercial scale implementation. At present, risk management is a generally accepted tool for decision making and control of the risks that come from a wide variety of both industrial and not industrial human activities. It is an important element for the implementation of a large number of safety regulations, corporate policies and good industry practice . Thus, for example, chemical and petroleum, nuclear industries, aviation and aerospace or waste management make use of risk management as a central tool to identification the risks, to establish the importance and ranking of the estimated risks, to estimate the cost/benefit ratio in reducing these risks, and to carry out political and institutional processes to manage them. Risk management provides a broad framework to aid decision-making through the identification, analysis, and evaluation and control of risks, including, of course, those for health and safety. A key aspect is the need to ensure the identification of all significant risks, from which it may take appropriate measures (risk analysis). An unidentified risk allows or evaluation or its monitoring, reduction, acceptance or cancellation. After the analysis stage it may be considered for assessment, that is, the risk quantification, to classify them (acceptable, unacceptable, etc. risk). These actions are determined based on a balance between risk control strategies, their effectiveness and cost, and the needs, problems and concerns of those who may be affected, or stake holders, an essential element in the strategic planning of any activity or

  17. Development and Evaluation of an On-Line Educational Module for Volunteer Leaders on Bio-Security in Washington State 4-H Livestock Projects

    Science.gov (United States)

    Stevenson, Jill L.; Moore, Dale A.; Newman, Jerry; Schmidt, Janet L.; Smith, Sarah M.; Smith, Jean; Kerr, Susan; Wallace, Michael; BoyEs, Pat

    2011-01-01

    An on-line module on disease prevention was created for 4-H volunteer leaders who work with livestock projects in Washington to better prepare them to teach youth about bio-security and its importance in 4-H livestock projects. Evaluation of the module and usage statistics since the module's debut were collected and evaluated. The module increases…

  18. Absorption-line detections of 105-106 K gas in spiral-rich groups of galaxies

    International Nuclear Information System (INIS)

    Stocke, John T.; Keeney, Brian A.; Danforth, Charles W.; Syphers, David; Yamamoto, H.; Shull, J. Michael; Green, James C.; Froning, Cynthia; Savage, Blair D.; Wakker, Bart; Kim, Tae-Sun; Ryan-Weber, Emma V.; Kacprzak, Glenn G.

    2014-01-01

    Using the Cosmic Origins Spectrograph (COS) on the Hubble Space Telescope, the COS Science Team has conducted a high signal-to-noise survey of 14 bright QSOs. In a previous paper, these far-UV spectra were used to discover 14 'warm' (T ≥ 10 5 K) absorbers using a combination of broad Lyα and broad O VI absorptions. A reanalysis of a few of this new class of absorbers using slightly relaxed fitting criteria finds as many as 20 warm absorbers could be present in this sample. A shallow, wide spectroscopic galaxy redshift survey has been conducted around these sight lines to investigate the warm absorber environment, which is found to be spiral-rich groups or cluster outskirts with radial velocity dispersions σ = 250-750 km s –1 . While 2σ evidence is presented favoring the hypothesis that these absorptions are associated with the galaxy groups and not with the individual, nearest galaxies, this evidence has considerable systematic uncertainties and is based on a small sample size so it is not entirely conclusive. If the associations are with galaxy groups, the observed frequency of warm absorbers (dN/dz = 3.5-5 per unit redshift) requires them to be very extended as an ensemble on the sky (∼1 Mpc in radius at high covering factor). Most likely these warm absorbers are interface gas clouds whose presence implies the existence of a hotter (T ∼ 10 6.5 K), diffuse, and probably very massive (>10 11 M ☉ ) intra-group medium which has yet to be detected directly.

  19. The gas turbine modular helium reactor. An international project to develop a safe, efficient, flexible product

    International Nuclear Information System (INIS)

    Silberstein, A.J.

    1998-01-01

    As originally scheduled, the Conceptual Design Report of the 600 Mwt Gas Turbine Modular Helium Reactor has been issued in October 1997 by OKBM in Nizhny Novgorod, a keystone Russian Engineering Institute fully involved in the realization of this International Project. The plutonium burning, graphite moderated helium cooled reactor design results from the work done on the basis of General Atomics original concept combined with the goal of optimizing safety power and efficiency with multi contributions in specific fields from the Russian organizations: MINATOM, OKBM, VNIINM, Lutch, Kurchatov Institute, Seversk Chemical Combinat, Fuji Electric and FRAMATOME. The objective to concentrate the engineering work in Russia has met a full success due principally to the quality and experience of the people, to the international support and to the progressive integration of new techniques of communication, of project management culture and utilization of modern computerized design tools and methods. To day the best international standard of quality is reached in the engineering activity and expected to stay at this level for future developments, when including experimental facilities operation and components manufacturing activities, thanks to the diffusion of the common culture, acquired by the main actors during the conceptual design phase, that will be exported to Russian third parties. At this stage we are planning to start design verification and sensitive components and systems qualification, with the same original actors. The European Commission has already shown some significant interest through the MICHELANGELO Initiative in supporting the HTR concepts assessment and identification of the R and D needs. We are looking forward for further support from the International Community and particularly from European Institutions in the frame of the 5th PCRD to pursue the GT MHR R and D program. Furthermore we are looking for funding the building of a prototype in Russia

  20. A proposal for an infrared/optical beam line for the new Australian synchrotron project

    International Nuclear Information System (INIS)

    Creagh, D.

    2002-01-01

    particular minerals and the determination of fluid and gas phases in geological specimen; the examination of environmental test samples such as streamflow and atmospheric filters to determine mineral and organic deposits; forensic science, in particular the study of inks, paints, papers, the components in recreational and performance-enhancing drugs. The beamline would be able to serve both pure and applied research, and would be particularly useful for studies where following a time-varying process, such as a chemical reaction, or examining the distribution of a chosen species on a surface

  1. Environmental management project of the Patache power plant project and associated transmission line; Gestion ambiental proyecto central termoelectrica Patache y linea de transmision asociada

    Energy Technology Data Exchange (ETDEWEB)

    Carreno Paredes, Cristian [Compania Electrica Tapaca (CELTA, S. A.), (Chile)

    1996-12-31

    This report makes a brief description of the services developed by INGENDESA of the projects executed in the area of engineering as well as in the area of environmental matters. In a second instance a relatively detailed presentation is made of the most important background of the Chilean project: {sup E}nvironmental Management of the Patache Power Plant and the Associated Transmission Line-Compania Electrica Tarapaca (CELTA, S.A.) Region I{sup .} The justification for the construction of the power plant and the environmental problems associated with the same are described [Espanol] En el presente informe se hace una breve presentacion de los servicios desarrollados por INGENDESA, de los proyectos elaborados tanto en el area de la ingenieria como en la tematica ambiental. En segunda instancia, se hace una presentacion relativamente detallada de los antecedentes mas importantes del proyecto chileno {sup G}estion Ambiental Central Patache y Linea de Transmision Asociada - Compania Electrica Tarapaca (CELTA, S.A.) I Region{sup .} Se describe la justificacion de la construccion de esta central termoelectrica y los problemas ambientales asociados a la misma

  2. Environmental management project of the Patache power plant project and associated transmission line; Gestion ambiental proyecto central termoelectrica Patache y linea de transmision asociada

    Energy Technology Data Exchange (ETDEWEB)

    Carreno Paredes, Cristian [Compania Electrica Tapaca (CELTA, S. A.), (Chile)

    1997-12-31

    This report makes a brief description of the services developed by INGENDESA of the projects executed in the area of engineering as well as in the area of environmental matters. In a second instance a relatively detailed presentation is made of the most important background of the Chilean project: {sup E}nvironmental Management of the Patache Power Plant and the Associated Transmission Line-Compania Electrica Tarapaca (CELTA, S.A.) Region I{sup .} The justification for the construction of the power plant and the environmental problems associated with the same are described [Espanol] En el presente informe se hace una breve presentacion de los servicios desarrollados por INGENDESA, de los proyectos elaborados tanto en el area de la ingenieria como en la tematica ambiental. En segunda instancia, se hace una presentacion relativamente detallada de los antecedentes mas importantes del proyecto chileno {sup G}estion Ambiental Central Patache y Linea de Transmision Asociada - Compania Electrica Tarapaca (CELTA, S.A.) I Region{sup .} Se describe la justificacion de la construccion de esta central termoelectrica y los problemas ambientales asociados a la misma

  3. ETDR, The European Union's Experimental Gas-Cooled Fast Reactor Project

    International Nuclear Information System (INIS)

    Poette, Christian; Brun-Magaud, Valerie; Morin, Franck; Dor, Isabelle; Pignatel, Jean-Francois; Bertrand, Frederic; Stainsby, Richard; Pelloni, Sandro; Every, Denis; Da Cruz, Dirceu

    2008-01-01

    In the Gas-Cooled Fast Reactor (GFR) development plan, the Experimental Technology Demonstration Reactor (ETDR) is the first necessary step towards the electricity generating prototype GFR. It is a low power (∼50 MWth) Helium cooled fast reactor. The pre-conceptual design of the ETDR is shared between European partners through the GCFR Specifically Targeted Research Project (STREP) within the European Commission's 6. R and D Framework Program. After recalling the place of ETDR in the GFR development plan, the main reactor objectives, the role of the European partners in the different design and safety tasks, the paper will give an overview of the current design with recent progresses in various areas like: - Sub-assembly technology for the starting core (pin bundle with MOX fuel and stainless steel cladding). - The design of experimental advanced ceramic GFR fuel sub-assemblies included in several locations of the starting core. - Starting Core reactivity management studies model including experimental GFR sub-assemblies. - Neutron and radiation shielding calculations using a specific MCNP model. The model allows evaluation of the neutron doses for the vessel and internals and radiation doses for maintenance operations. - System design and safety considerations, with a reactor architecture largely influenced by the Decay Heat Removal strategy (DHR) for de-pressurized accidents. The design of the reactor raises a number of issues in terms of fuel, neutronics, thermal-hydraulics codes qualification as well as critical components (blowers, IHX, thermal barriers) qualification. An overview of the R and D development on codes and technology qualification program is presented. Finally, the status of international collaborations and their perspectives for the ETDR are mentioned. (authors)

  4. Greenhouse gas emission trends and projections in Europe 2011. Tracking progress towards Kyoto and 2020 targets

    Energy Technology Data Exchange (ETDEWEB)

    Busche, J.; Scheffler, M.; Graichen, V. (Umweltbundesamt, Vienna (Austria)) (and others)

    2011-10-15

    At the end of 2010, the EU-15 was on track to achieve its Kyoto target but three EU-15 Member States (Austria, Italy and Luxembourg) were not on track to meet their burden-sharing targets. These countries must therefore seriously consider further action to ensure compliance, in particular revising their plans on using flexible mechanisms. Among the EEA member countries outside the EU, Liechtenstein and Switzerland were not on track to achieve their Kyoto target at the end of 2009. All other European countries are on track to meet their targets, either based on domestic emissions only or with the assistance of Kyoto mechanisms. The economic recession had a significant impact on the EU's total greenhouse gas (GHG) emission trends but a more limited effect on progress towards Kyoto targets. This is because emissions in the sectors covered by the EU Emissions Trading Scheme (ETS), which were most affected by the crisis, do not affect Kyoto compliance once ETS caps have been set. With existing national measures, Member States do not project enough emission reductions for the EU to meet its unilateral 20 % reduction commitment in 2020. Additional measures currently planned by Member States will help further reduce emissions but will be insufficient to achieve the important emission cuts needed in the longer term. By 2020 Member States must enhance their efforts to reduce emissions in non-EU ETS sectors, such as the residential, transport or agriculture sectors, where legally binding national targets have been set under the EU's 2009 climate and energy package. (Author)

  5. The hybrid reactor project based on the straight field line mirror concept

    International Nuclear Information System (INIS)

    Ågren, O.; Noack, K.; Moiseenko, V. E.; Hagnestål, A.; Källne, J.; Anglart, H.

    2012-01-01

    The straight field line mirror (SFLM) concept is aiming towards a steady-state compact fusion neutron source. Besides the possibility for steady state operation for a year or more, the geometry is chosen to avoid high loads on materials and plasma facing components. A comparatively small fusion hybrid device with “semi-poor” plasma confinement (with a low fusion Q factor) may be developed for industrial transmutation and energy production from spent nuclear fuel. This opportunity arises from a large fission to fusion energy multiplication ratio, Q r = P fis /P fus >>1. The upper bound on Q r is primarily determined by geometry and reactor safety. For the SFLM, the upper bound is Q r ≈150, corresponding to a neutron multiplicity of k eff =0.97. Power production in a mirror hybrid is predicted for a substantially lower electron temperature than the requirement T e ≈10 keV for a fusion reactor. Power production in the SFLM seems possible with Q≈0.15, which is 10 times lower than typically anticipated for hybrids (and 100 times smaller than required for a fusion reactor). This relaxes plasma confinement demands, and broadens the range for use of plasmas with supra-thermal ions in hybrid reactors. The SFLM concept is based on a mirror machine stabilized by qudrupolar magnetic fields and large expander tanks beyond the confinement region. The purpose of the expander tanks is to distribute axial plasma loss flow over a sufficiently large area so that the receiving plates can withstand the heat. Plasma stability is not relying on a plasma flow into the expander regions. With a suppressed plasma flow into the expander tanks, a possibility arise for higher electron temperature. A brief presentation will be given on basic theory for the SFLM with plasma stability and electron temperature issues, RF heating computations with sloshing ion formation, neutron transport computations with reactor safety margins and material load estimates, magnetic coil designs as well as

  6. The hybrid reactor project based on the straight field line mirror concept

    Science.gov (United States)

    Ågren, O.; Noack, K.; Moiseenko, V. E.; Hagnestâl, A.; Källne, J.; Anglart, H.

    2012-06-01

    The straight field line mirror (SFLM) concept is aiming towards a steady-state compact fusion neutron source. Besides the possibility for steady state operation for a year or more, the geometry is chosen to avoid high loads on materials and plasma facing components. A comparatively small fusion hybrid device with "semi-poor" plasma confinement (with a low fusion Q factor) may be developed for industrial transmutation and energy production from spent nuclear fuel. This opportunity arises from a large fission to fusion energy multiplication ratio, Qr = Pfis/Pfus>>1. The upper bound on Qr is primarily determined by geometry and reactor safety. For the SFLM, the upper bound is Qr≈150, corresponding to a neutron multiplicity of keff=0.97. Power production in a mirror hybrid is predicted for a substantially lower electron temperature than the requirement Te≈10 keV for a fusion reactor. Power production in the SFLM seems possible with Q≈0.15, which is 10 times lower than typically anticipated for hybrids (and 100 times smaller than required for a fusion reactor). This relaxes plasma confinement demands, and broadens the range for use of plasmas with supra-thermal ions in hybrid reactors. The SFLM concept is based on a mirror machine stabilized by qudrupolar magnetic fields and large expander tanks beyond the confinement region. The purpose of the expander tanks is to distribute axial plasma loss flow over a sufficiently large area so that the receiving plates can withstand the heat. Plasma stability is not relying on a plasma flow into the expander regions. With a suppressed plasma flow into the expander tanks, a possibility arise for higher electron temperature. A brief presentation will be given on basic theory for the SFLM with plasma stability and electron temperature issues, RF heating computations with sloshing ion formation, neutron transport computations with reactor safety margins and material load estimates, magnetic coil designs as well as a discussion on

  7. Identifying and implementing gas-fired private power projects in Asia

    International Nuclear Information System (INIS)

    Mark, R.P.

    1993-01-01

    The approach to emerging energy markets in Asia of Enron, one of the major independent producers and developers of natural gas, is described. The interest of the company has been stimulated both by the availability of gas resources in Asia and the interest shown in many countries in using natural gas as a fuel for power generation. Possibilities for development are being created by plans for major new pipelines from Russia and the central Asian states and the availability of liquefied natural gas. (UK)

  8. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 4: Chapters 8 through 13

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains chapters 8--13 of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. Attention is focused on the following: effects of oil on the physical, biological, and human environments; effects of noise on the biological and human environments; cumulative effects on the environment; and comparison of project alternatives and their impacts

  9. Advanced Flue Gas Desulfurization (AFGD) Demonstration Project. Technical progress report No. 15, July 1, 1993--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    The goal of this project is to demonstrate that, by combining state-of-the-art technology, highly efficient plant operation and maintenance capabilities and by-product gypsum sales, significant reductions of SO{sub 2} emissions can be achieved at approximately one-half the life cycle cost of a conventional Flue Gas Desulfurization (FGD) system. Further, this emission reduction is achieved without generating solid waste and while minimizing liquid wastewater effluent. Basically, this project entails the design, construction and operation of a nominal 600 MWe AFGD facility to remove SO{sub 2} from coal-fired power plant flue gas at the Northern Indiana Public Service Company`s Bailly Generating Station.

  10. A survey of financing possibilities of projects in energetics with emphasis to the market with natural gas

    Directory of Open Access Journals (Sweden)

    Abed Al-Zabidi

    2009-09-01

    Full Text Available With the present expansion of globalization within economic competition of individual countries are stability and economicdevelopment inevitably bound with the term of energy, therefore also the natural gas. Presently, energy is still the most important factorof economic and social development.The critical tempo of energy consumption, entering of new players on the energetic market, quick industrialization of Asiancountries and accordingly growing difference between supply and demand, worries of depletion of the existing sources and worseningof our living environment are all worldwide global problems.The subject of the presented paper is a survey of market with natural gas in Slovakia, possibilities of diversification of sourcesof natural gas, its transport and distribution with the emphasis to the possibilities of financing of projects in energetics.

  11. Designing a gas cooled ADS for enhanced waste transmutation. The PDS-XADS European Project contribution

    International Nuclear Information System (INIS)

    Rimpault, G.; Sunderland, R.; Mueller, A.C.

    2006-01-01

    Accelerator driven system (ADS) are complex in their conception. It is the reason why studies proceed step by step. At the moment, one can take advantage of the work performed within the PDS-XADS project (Preliminary Design Studies of an eXperimental ADS) of the 5. European programme. The PDS-XADS project has been the first one to define rather detailed plants for a demonstration of the ADS technology, making a full use of European expertise from different research organizations, industries and universities. This first step was using MOX fuel technology with a design mostly devoted to the technology demonstration. Elaborated designs are sufficiently advanced to confirm the good prospects in the feasibility of such ADS plants. Also weak points have been identified and it is not a surprise that the open issues appear in the most unusual parts of reactor design i.e. in the spallation module. For what concerns the accelerator, the high reliability/availability requirements remain an important issue. The strategy to overcome these difficulties is a standard practice in reliability engineering, a technical discipline for risk estimation and management that is followed for many industrial applications or products in various fields. The gas technology exhibits clear interests in terms of coolant chemical inertness, overall simplicity of the reactor (internals, components) that can be based on proven helium cooled reactor experience but the chosen volume power (56 W/cm 3 ) for this concept is an upper limit due to constraints to the mechanical behaviour of the steel of the cladding. On the other hand, the removal of the decay heat is very much associated to the use of active systems even in protected transients i.e. with proton beam interruption. The statistical safety analysis has demonstrated however that the heat exchangers are the less reliable part of the DHR system. A solution to overcome this difficulty is the use of redundant and diversified systems. The final

  12. Safety control system and its interface to EPICS for the off-line front end of the SPES project

    International Nuclear Information System (INIS)

    Vasquez, J.; Andrighetto, A.; Bassato, G.; Costa, L.; Giacchini, M.; Bertocco, M.

    2012-01-01

    The SPES (Selective Production of Exotic Species) project is based on a facility for the production of neutron-rich radioactive ion beams using the isotope separation on-line technique. The SPES off-line front-end apparatus involves a number of subsystems and procedures that are potentially dangerous both for human operators and for the equipment. The high voltage power supply, the ion source complex power supplies, the target chamber handling systems and the laser source are some example of these subsystems. For that reason, a safety control system has been developed. It is based on Schneider Electrics Preventa family safety modules that control the power supply of critical subsystems in combination with safety detectors that monitor critical variables. A Programmable Logic Controller (PLC), model BMXP342020 from the Schneider Electrics Modicon M340 family, is used for monitoring the status of the system as well as controlling the sequence of some operations in automatic way. A touch screen, model XBTGT5330 from the Schneider Electrics Magelis family, is used as Human Machine Interface (HMI) and communicates with the PLC using MODBUS-TCP. Additionally, an interface to the EPICS control network was developed using a home-made MODBUS-TCP EPICS driver in order to integrate it to the control system of the Front End as well as present the status of the system to the users on the main control panel. (authors)

  13. Magnetic field selective enhancement of Li I lines comparing Li II line in laser ablated lithium plasma at 10- 2 mbar air ambient gas

    Science.gov (United States)

    Liu, Ping; Wu, Ding; Sun, Liying; Hai, Ran; Liu, Jiamin; Ding, Hongbin

    2017-11-01

    In this paper, the effect of magnetic field (1.1 T) on the atomic and ionic spectral emission of a laser produced lithium plasma at low pressure has been investigated. The experimental results indicate that magnetic field enhances the intensities of Li I spectral lines but reduces the Li II spectral lines intensities. In this study, two narrowband filters were placed before the ICCD camera to observe the evolution feature of Li II spectral line (548.39 nm, 2p3P2,1,0 → 2s3S1) and Li I spectral line (610.30 nm, 3d2P3/2, 5/2 → 2p2P1/2, 3/2), respectively. The plasma dynamic images show that with the magnetic field, the number density of luminous Li atoms is higher, while the number density of luminous Li ions is lower in comparison to the field-free case. The reduced Li II spectral intensities indicate that the quenching rate of Li ions in the excited state is greater than that without the magnetic field. The enhanced impact frequency of recombination indicates that magnetic field increases the recombination process of electron and Li ions. All of these observations strongly suggest that magnetic confinement increases the recombination process of the electrons with Li ions in the plasma, which results in the decrease in the intensity of Li II line. The results are useful for applying laser-induced breakdown spectroscopy (LIBS) to in-situ diagnose the processes of lithium wall conditioning in EAST tokamak.

  14. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendices B through K

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US. Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices B--K of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  15. Clean Coal Technology III: 10 MW Demonstration of Gas Suspension Absorption final project performance and economics report

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, F.E.

    1995-08-01

    The 10 MW Demonstration of the Gas Suspension Absorption (GSA) program is a government and industry co-funded technology development. The objective of the project is to demonstrate the performance of the GSA system in treating a 10 MW slipstream of flue gas resulting from the combustion of a high sulfur coal. This project involves design, fabrication, construction and testing of the GSA system. The Project Performance and Economics Report provides the nonproprietary information for the ``10 MW Demonstration of the Gas Suspension Absorption (GSA) Project`` installed at Tennessee Valley Authority`s (TVA) Shawnee Power Station, Center for Emissions Research (CER) at Paducah, Kentucky. The program demonstrated that the GSA flue-gas-desulfurization (FGD) technology is capable of achieving high SO{sub 2} removal efficiencies (greater than 90%), while maintaining particulate emissions below the New Source Performance Standards (NSPS), without any negative environmental impact (section 6). A 28-day test demonstrated the reliability and operability of the GSA system during continuous operation. The test results and detailed discussions of the test data can be obtained from TVA`s Final Report (Appendix A). The Air Toxics Report (Appendix B), prepared by Energy and Environmental Research Corporation (EERC) characterizes air toxic emissions of selected hazardous air pollutants (HAP) from the GSA process. The results of this testing show that the GSA system can substantially reduce the emission of these HAP. With its lower capital costs and maintenance costs (section 7), as compared to conventional semi-dry scrubbers, the GSA technology commands a high potential for further commercialization in the United States. For detailed information refer to The Economic Evaluation Report (Appendix C) prepared by Raytheon Engineers and Constructors.

  16. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendices L through P

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices L-P of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  17. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 3: Chapters 5 through 7

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains chapters 5--7 of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. Attention is focused on the effects of oil on the physical, biological, and human environments

  18. Fracture lines: will Canada's water be protected in the rush to develop shale gas?

    Energy Technology Data Exchange (ETDEWEB)

    Parfitt, Ben [Munk School of Global Affairs at the University of Toronto (Canada)

    2010-10-15

    By combining hydraulic fracking with horizontal drilling, the gas industry has been able to unlock significant amounts of natural gas trapped inside deep and densely packed shale rock. The exploitation of shale gas has been a remarkable revolution in the last decade, going from hardly any production in 2000 to 20% of the United States' gas production in 2010. This cheap and abundant resource has been referred to as a game changer by North American industries and governments. However concerns about water usage and groundwater contamination have been raised. Indeed, the shale gas industry is responsible for the contamination of about 1,000 water wells and has been criticized for its important water withdrawals. This report intends to present the effects of shale gas production on the water supplies in Canada. It reviews the state of groundwater mapping in shale rich regions and reviews regulatory frameworks to determine if they are sufficient to protect water resources.

  19. Natural Gas Deliverability Task Force report: A joint FERC/DOE project

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of the FERC/DOE Natural Gas Deliverability Task Force Report was threefold: (1) to review current deliverability data for utility, accuracy, and timeliness; (2) to identify mechanisms for closing significant gaps in information resulting from changing market structures; and (3) to ensure that technologies are available to meet the needs of the emerging, competitive natural gas industry

  20. Flammable gas project expert elicitation results for Hanford Site double-shell tanks

    International Nuclear Information System (INIS)

    Bratzel, D.R.

    1998-01-01

    This report documents the results of the second phase of parameter quantification by the flammable gas expert panel. This second phase is focused on the analysis of flammable gas accidents in the Hanford Site double-shell tanks. The first phase of parameter quantification, performed in 1997 was focused on the analysis of Hanford single-shell tanks