WorldWideScience

Sample records for fy2008 compensation area

  1. Disability Compensation and Patient Expenditures: FY2000 to FY2013

    Data.gov (United States)

    Department of Veterans Affairs — This report contains FY2000 through FY2013 data on disability compensation expenditures and recipients and on VA healthcare system patients and patient expenditures.

  2. Hangman Restoration Project Year-End Report FY2008.

    Energy Technology Data Exchange (ETDEWEB)

    Coeur d' Alene Tribe Department of Natural Resources.

    2008-11-12

    This report covers the main goals of FY2008 from which the Work Elements were derived. The goals and products are listed by heading and the associated work elements are referenced in the text. A list of the FY2008 Work Elements is included as Appendix A. FY2008 witnessed the completion of the hntkwipn Management Plan and the first substantive efforts to restore the important habitats encompassed by the mitigation properties in the Upper Hangman Watershed. Native grasses were planted and germination was evaluated. Also, drain tiles that greatly altered the hydrologic function of the Sheep and Hangman Creek Flood Plains were removed and/or disrupted. Preparation for future restoration efforts were also made in FY2008. Designs were produced for the realignment of Sheep Creek and the decommissioning of seven drainage ditches within hntkwipn. A prioritization plan was drafted that greatly expands the area of focus for restoring native fish population in Hangman Creek.

  3. FY 2008 Public Libraries Survey

    Data.gov (United States)

    Institute of Museum and Library Services — Dig into FY 2008 data on public library systems (referred to as administrative entities in the Public Libraries Survey) and main libraries, branches, and bookmobiles...

  4. Idaho National Laboratory Cultural Resource Monitoring Report for FY 2008

    Energy Technology Data Exchange (ETDEWEB)

    Brenda R. Pace

    2009-01-01

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year 2008 (FY 2008). Throughout the year, 45 cultural resource localities were revisited including: two locations of heightened Shoshone-Bannock tribal sensitivity, four caves, one butte, twenty-eight prehistoric archaeological sites, three historic homesteads, two historic stage stations, one historic canal construction camp, three historic trails, and Experimental Breeder Reactor-I, which is a designated National Historic Landmark. Several INL project areas were also monitored in FY 2008 to assess project compliance with cultural resource recommendations, confirm the locations of previously recorded cultural resources in relation to project activities, to assess the damage caused by fire-fighting efforts, and to watch for cultural materials during ground disturbing activities. Although impacts were documented at a few locations, no significant adverse effects that would threaten the National Register eligibility of any resource were observed. Monitoring also demonstrated that INL projects generally remain in compliance with recommendations to protect cultural resources

  5. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs - FY 2008 Budget Request

    Energy Technology Data Exchange (ETDEWEB)

    2007-03-01

    This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and for each of its nine Research, Development, Demonstration, and Deployment (RD3) programs. Benefits for the FY 2008 budget request are estimated for the midterm (2008-2030) and long term (2030-2050).

  6. FY 2008 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — This Supplement to the President`s Fiscal Year FY 2008 Budget provides a technical summary of the budget request for the Networking and Information Technology...

  7. ORNLs Laboratory Directed Research and Development Program FY 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-03-01

    The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2008. The associated FY 2008 ORNL LDRD Self-Assessment (ORNL/PPA-2008/2) provides financial data and an internal evaluation of the program’s management process.

  8. Appendix C: Biomass Program inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  9. Tanks focus area multiyear program plan - FY96-FY98

    International Nuclear Information System (INIS)

    1995-07-01

    The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary

  10. 76 FR 32846 - Defense Federal Acquisition Regulation Supplement; Representation Relating to Compensation of...

    Science.gov (United States)

    2011-06-06

    ... written post-employment ethics opinion before receiving compensation from a contractor. It also applies to... procurement integrity for DoD. 3. DFARS 203.171-3 is an implementation of section 847 of the NDAA for FY 2008... receiving compensation from the contractor, the post- employment ethics opinion regarding post-employment...

  11. Appendix E: Wind Technologies Program inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  12. Appendix G: Building Technologies Program inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  13. Present status of refining and conversion facility dismantling. Progress in latter half of 2008FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Takahashi, Nobuo; Tokuyasu, Takashi

    2010-01-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2008FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room/each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  14. Annual report of the Neutron Irradiation and Testing Reactor Center. FY 2008. April 1, 2008 - March 31, 2009

    International Nuclear Information System (INIS)

    2009-12-01

    The JMTR, one of the most high flux test reactors in the world, has been used for the irradiation experiments of fuels and materials related to LWRs, fundamental research and radioisotope productions. The JMTR was stopped at the beginning of August 2006 to conduct refurbishment works, and the reoperation will be planned from FY 2011. After reoperation, the JMTR will contribute to many fields, such as the lifetime extension of LWRs, expansion of industrial use, progress of science and technology. This report summarizes the activities on refurbishment works, development of new irradiation techniques, enhancement of reactor availability, etc. in FY 2008. (author)

  15. Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

    2008-11-19

    The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These

  16. Appendix J: Weatherization and Intergovernmental Program (WIP) inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  17. Pacific Northwest National Laboratory Institutional Plan FY 2004-2008

    Energy Technology Data Exchange (ETDEWEB)

    Quadrel, Marilyn J.

    2004-04-15

    This Institutional Plan for FY 2004-2008 is the principal annual planning document submitted to the Department of Energy's Office of Science by Pacific Northwest National Laboratory in Richland, Washington. This plan describes the Laboratory's mission, roles, and technical capabilities in support of Department of Energy priorities, missions, and plans. It also describes the Laboratory strategic plan, key planning assumptions, major research initiatives, and program strategy for fundamental science, energy resources, environmental quality, and national security.

  18. Appendix F: FreedomCAR and Vehicle Technologies Program inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  19. Review of research on simulation engineering in FY2008

    International Nuclear Information System (INIS)

    2010-02-01

    Research on simulation engineering for nuclear applications, based on 'the plan for meeting the mid-term goal of the Japan Atomic Energy Agency', has been performed at Center for Computational Science and e-Systems, Japan Atomic Energy Agency (CCSE/JAEA). CCSE established the committee consisting outside experts and authorities which does research evaluation and advices for the assistance of the research and development. This report summarizes the result of the evaluation by the committee on the research on simulation engineering performed at CCSE/JAEA in FY2008. (author)

  20. Laboratory Directed Research and Development FY2008 Annual Report

    International Nuclear Information System (INIS)

    Kammeraad, J.E.; Jackson, K.J.; Sketchley, J.A.; Kotta, P.R.

    2009-01-01

    , industry, and other scientific and research institutions. By keeping the Laboratory at the forefront of science and technology, the LDRD Program enables us to meet our mission challenges, especially those of our ever-evolving national security mission. The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2008 (FY08) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: A broad description of the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY08, and a list of publications that resulted from the research in FY08. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year

  1. Appendix B: Hydrogen, Fuel Cells, and Infrastructure Technologies Program inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  2. Tanks Focus Area (TFA) FY1999 Midyear Review Report

    International Nuclear Information System (INIS)

    Schlahta, Stephan N.

    1999-01-01

    The purpose of the Tanks Focus Area (TFA) Midyear Review was to improve the quality and responsiveness of TFA technical solutions to identified user needs. This review goal was achieved through executing a multi-phased review approach. The first phase of the midyear review focused on the subset of FY99 work identified by Department of energy users as having continuing benefit in FY00-01. The TFA FY00-02 Technical Responses identified FY99 work that had continued applicability based on the most current set of site user needs. Each TFA FY00-02 Technical Response which included FY work scope was reviewed by the TFA Technical Advisory Group (TAG), in a meeting held in February 1999. Made up of technical experts from across the country, the TAG provides high-quality, short-turnaround, independent technical reviews for the TFA

  3. RESULTS OF TRITIUM TRACKING AND GROUNDWATER MONITORING AT THE HANFORD SITE 200 AREA STATE APPROVED LAND DISPOSAL SITE. FISCAL YEAR 2008

    International Nuclear Information System (INIS)

    Erb, D.B.

    2008-01-01

    The Hanford Site's 200 Area Effluent Treatment Facility (ETF) processes contaminated aqueous wastes derived from Hanford Site facilities. The treated wastewater occasionally contains tritium, which cannot be removed by the ETF prior to the wastewater being discharged to the 200 Area State-Approved Land Disposal Site (SALDS). During the first 11 months of fiscal year 2008 (FY08) (September 1, 2007, to July 31, 2008), approximately 75.15 million L (19.85 million gal) of water were discharged to the SALDS. Groundwater monitoring for tritium and other constituents, as well as water-level measurements, is required for the SALDS by State Waste Discharge Permit Number ST-4500 (Ecology 2000). The current monitoring network consists of three proximal (compliance) monitoring wells and nine tritium-tracking wells. Quarterly sampling of the proximal wells occurred in October 2007 and in January/February 2008, April 2008, and August 2008. The nine tritium-tracking wells, including groundwater monitoring wells located upgradient and downgradient of the SALDS, were sampled in January through April 2008. Water-level measurements taken in the three proximal SALDS wells indicate that a small groundwater mound is present beneath the facility, which is a result of operational discharges. The mound increased in FY08 due to increased ETF discharges from treating groundwater from extraction wells at the 200-UP-l Operable Unit and the 241-T Tank Farm. Maximum tritium activities increased by an order of magnitude at well 699-48-77A (to 820,000 pCi/L in April 2008) but remained unchanged in the other two proximal wells. The increase was due to higher quantities of tritium in wastewaters that were treated and discharged in FY07 beginning to appear at the proximal wells. The FY08 tritium activities for the other two proximal wells were 68,000 pCi/L at well 699-48-77C (October 2007) and 120,000 pCi/L at well 699-48-77D (October 2007). To date, no indications of a tritium incursion from the

  4. 77 FR 35061 - Announcement Regarding States Triggering “Off” in the Emergency Unemployment Compensation 2008...

    Science.gov (United States)

    2012-06-12

    ... Triggering ``Off'' in the Emergency Unemployment Compensation 2008 Program and the Federal-State Extended...: Announcement regarding states triggering ``off'' in the Emergency Unemployment Compensation 2008 (EUC08... average, seasonally adjusted total unemployment rate in Connecticut fell below the 8.0% rate required to...

  5. 77 FR 21811 - Announcement Regarding States Triggering “Off” in the Emergency Unemployment Compensation 2008...

    Science.gov (United States)

    2012-04-11

    ... Triggering ``Off'' in the Emergency Unemployment Compensation 2008 (EUC08) Program and the Federal-State.... SUMMARY: Announcement regarding states triggering ``off'' in the Emergency Unemployment Compensation 2008... average, seasonally-adjusted total unemployment rate (TUR trigger) for Texas fell below the 8.5% threshold...

  6. Laboratory Directed Research and Development FY2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Kammeraad, J E; Jackson, K J; Sketchley, J A; Kotta, P R

    2009-03-24

    universities, industry, and other scientific and research institutions. By keeping the Laboratory at the forefront of science and technology, the LDRD Program enables us to meet our mission challenges, especially those of our ever-evolving national security mission. The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2008 (FY08) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: A broad description of the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY08, and a list of publications that resulted from the research in FY08. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year.

  7. 77 FR 35062 - Announcement Regarding States Triggering “Off” in the Emergency Unemployment Compensation 2008...

    Science.gov (United States)

    2012-06-12

    ... Triggering ``Off'' in the Emergency Unemployment Compensation 2008 Program and the Federal-State Extended...: Announcement regarding states triggering ``off'' in the Emergency Unemployment Compensation 2008 (EUC08... unemployment rate be at least 110% of one of the rates from a comparable period in one of the three prior years...

  8. FMCSA safety program effectiveness measurement : compliance review effectiveness model results for carriers with compliance reviews in FY 2008

    Science.gov (United States)

    2012-09-30

    In FY 2008, Federal and State enforcement personnel conducted 14,906 compliance reviews (CRs) on individual motor carriers. It is intended that through education, heightened safety regulation awareness, and the enforcement effects of the CR, carriers...

  9. FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    Butcher, T.; Swingle, R.; Crapse, K.; Millings, M.; Sink, D.

    2011-01-01

    The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SA baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008

  10. Using Organizational Philosophy to Create a Self-Sustaining Compensation Plan Without Harming Academic Missions.

    Science.gov (United States)

    Leverence, Robert; Nuttall, Richard; Palmer, Rachel; Segal, Mark; Wood, Alicia; Yancey, Fay; Shuster, Jonathon; Brantly, Mark; Hromas, Robert

    2017-08-01

    Academic physician reimbursement has moved to productivity-based compensation plans. To be sustainable, such plans must be self-funding. Additionally, unless research and education are appropriately valued, faculty involved in these efforts will become disillusioned, yet revenue generation in these activities is less robust than for clinical care activities. Faculty at the Department of Medicine, University of Florida Health, elected a committee of junior and senior faculty and division chiefs to restructure the compensation plan in fiscal year (FY) 2011. This committee was charged with designing a new compensation plan based on seven principles of organizational philosophy: equity, compensation coupled to productivity, authority aligned with responsibility, respect for all academic missions, transparency, professionalism, and self-funding in each academic mission. The new compensation plan was implemented in FY2013. A survey administered at the end of FY2015 showed that 61% (76/125) of faculty were more satisfied with this plan than the previous plan. Since the year before implementation, clinical relative value units per faculty increased 7% (from 3,458 in FY2012 to 3,704 in FY2015, P < .002), incentives paid per faculty increased 250% (from $3,191 in FY2012 to $11,153 in FY2015, P ≤ .001), and publications per faculty increased 15% (from 2.6 in FY2012 to 3.0 in FY2015, P < .001). Grant submissions, external funding, and teaching hours also increased per faculty but did not reach statistical significance. An important next step will be to incorporate quality metrics into the compensation plan, without affecting costs or throughput.

  11. Electronics Engineering Department Thrust Area report FY'84

    International Nuclear Information System (INIS)

    Minichino, C.; Phelps, P.L.

    1984-01-01

    This report describes the work of the Electronics Engineering Department Thrust Areas for FY'84: diagnostics and microelectronic engineering; signal and control engineering; microwave and pulsed power engineering; computer-aided engineering; engineering modeling and simulation; and systems engineering. For each Thrust Area, an overview and a description of the goals and achievements of each project is provided

  12. IDF Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2008-09-01

    This document provides a review and status of activities conducted in support of the CH2MHill Hanford Group (CHG) Compensatory Mitigation Implementation Plan (MIP) for the Integrated Disposal Facility (IDF). It includes time-zero monitoring results for planting activities conducted in December 2007, annual survival monitoring for all planting years, a summary of artificial burrow observations, and recommendations for the successful completion of DOE mitigation commitments for this project.

  13. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  14. State, Foreign Operations, and Related Programs: FY2009 Appropriations

    Science.gov (United States)

    2009-04-03

    resources in a few low- and low- middle income countries that have demonstrated a strong commitment to political, economic, and social reforms. The...several other areas.11 In FY2008, BBG proposed to reduce or eliminate radio broadcasting in a number of services, including Cantonese , Ukrainian

  15. The perceptions of teachers and principals toward providing additional compensation to teachers in high-need subject areas

    Science.gov (United States)

    Longing, Jeffrey Lucian

    The purpose of this study was to determine possible differences in the perceptions of teachers teaching in high-need areas (i.e., math, science, special education, etc.) and teachers not teaching in high-need areas, (i.e., business education, physical education, etc.) as defined by the states of Arkansas and Louisiana, regarding higher compensation for high-need teachers. In addition, possible perception differences among principals and teachers were determined. The independent variables consisted of gender, position held, years of certified experience, and certification areas. The dependent variable was the perceptions of the participants on providing higher compensation for high-need teachers in order to attract and retain them. The data for all variables were collected using the Teacher Compensation Survey. The sample for this study was limited to teachers, grades 9 through 12, and principals of public high schools in south Arkansas and north Louisiana. Forty-four school districts in south Arkansas (Arkansas Department of Education, 2008a) and north Louisiana (Louisiana Department of Education, 2008a) met the criteria for this study. Twenty-two superintendents gave permission for their districts to participate in the research. A sample of 849 teachers and 38 principals were identified in these districts. Surveys were returned from 350 teachers, creating a 41% response rate. When the 31 principals that returned surveys were added to the total population, the response rate increased to 43% with 381 of the 887 surveyed responding. However, 42 of the teachers and two of the principals skipped some of the questions on the survey and were not included in the study. The researcher used a One-Way ANOVA and independent t-tests to determine the presence of statistical differences at the .05 level. The data showed that most math and science teachers agreed that high-need teachers should be compensated at a higher rate than teachers not teaching in high-need areas. The data

  16. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    International Nuclear Information System (INIS)

    1998-03-01

    Consistent with the Environmental Management's (EM's) plan titled, ''Accelerating Cleanup: Paths to Closure'', and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided

  17. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

  18. The FY2011 Federal Budget

    Science.gov (United States)

    2010-08-04

    long been the largest source of federal revenues, followed by social insurance (payroll) taxes. Federal individual and corporate income tax revenues...915 billion (6.4% of GDP). Corporate income tax revenues fell from $304 billion in FY2008 to $138 billion in FY2009. Federal revenues from other

  19. 2001-2008 BBG Funding Overview

    Data.gov (United States)

    Broadcasting Board of Governors — This dataset presents BBG funding by Agency component for the period between FY 2001 and FY 2008. The data covers funding for each BBG broadcasting entity and for...

  20. 2008 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2009-03-30

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs) for each of the facilities, with the results submitted annually to U.S. Department of Energy (DOE) Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) performed an annual review in fiscal year (FY) 2008 by evaluating operational factors and research results that impact the continuing validity of the PAs and CAs. This annual summary report presents data and conclusions from the FY 2008 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.

  1. 2008 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    International Nuclear Information System (INIS)

    2009-01-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs) for each of the facilities, with the results submitted annually to U.S. Department of Energy (DOE) Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) performed an annual review in fiscal year (FY) 2008 by evaluating operational factors and research results that impact the continuing validity of the PAs and CAs. This annual summary report presents data and conclusions from the FY 2008 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R and D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R and D activities were reviewed to determine the adequacy of the CAs.

  2. State, Foreign Operations, and Related Programs: FY2008 Appropriations

    Science.gov (United States)

    2007-12-14

    and social reforms. The President initially pledged $5 billion annually by FY2006, although funds requested and appropriated have never reached this...to Cuba. The BBG is planning to eliminate several VOA services including Uzbek, Greek, and Cantonese as well as the RFE/RL Macedonia service. BBG also...increased to $230.0 million. The increase of $195 million is entirely for social services to Iraqi refugees. FY2007 Supplemental Request. On April 25

  3. 2008 Federal Energy Management Program (FEMP) Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  4. Environmental performance data in environmental report 2008

    International Nuclear Information System (INIS)

    Sato, Yoshinori; Noritake, Kazumitsu; Kawasaki, Takanori; Nemoto, Asako

    2009-02-01

    Japan Atomic Energy Agency published the Environmental Report 2008 concerning the activities of FY 2007 in August, 2008 under 'Law Concerning the Promotion of Business Activities with Environmental Consideration by Specified Corporations, etc, by Facilitating Access to Environmental Information, and Other Measures'. This report has been edited to show detailed environmental performance data in FY 2007 as the base of the Environmental Report 2008. This report would not only ensure traceability of the data in order to enhance the reliability of the environmental report, but also make useful measures for promoting activities of environmental considerations in JAEA. The environmental objectives in FY 2007 were to reduce the amounts of electric power consumption, fossil fuel usage, carbon dioxide emissions, and water usage by more than one percent in comparison with those in the previous fiscal year. The detailed environmental performance data in this report has shown that the numerical targets of the environmental objectives in FY 2007 were achieved. (author)

  5. Gravity Compensation Using EGM2008 for High-Precision Long-Term Inertial Navigation Systems

    Directory of Open Access Journals (Sweden)

    Ruonan Wu

    2016-12-01

    Full Text Available The gravity disturbance vector is one of the major error sources in high-precision and long-term inertial navigation applications. Specific to the inertial navigation systems (INSs with high-order horizontal damping networks, analyses of the error propagation show that the gravity-induced errors exist almost exclusively in the horizontal channels and are mostly caused by deflections of the vertical (DOV. Low-frequency components of the DOV propagate into the latitude and longitude errors at a ratio of 1:1 and time-varying fluctuations in the DOV excite Schuler oscillation. This paper presents two gravity compensation methods using the Earth Gravitational Model 2008 (EGM2008, namely, interpolation from the off-line database and computing gravity vectors directly using the spherical harmonic model. Particular attention is given to the error contribution of the gravity update interval and computing time delay. It is recommended for the marine navigation that a gravity vector should be calculated within 1 s and updated every 100 s at most. To meet this demand, the time duration of calculating the current gravity vector using EGM2008 has been reduced to less than 1 s by optimizing the calculation procedure. A few off-line experiments were conducted using the data of a shipborne INS collected during an actual sea test. With the aid of EGM2008, most of the low-frequency components of the position errors caused by the gravity disturbance vector have been removed and the Schuler oscillation has been attenuated effectively. In the rugged terrain, the horizontal position error could be reduced at best 48.85% of its regional maximum. The experimental results match with the theoretical analysis and indicate that EGM2008 is suitable for gravity compensation of the high-precision and long-term INSs.

  6. Gravity Compensation Using EGM2008 for High-Precision Long-Term Inertial Navigation Systems.

    Science.gov (United States)

    Wu, Ruonan; Wu, Qiuping; Han, Fengtian; Liu, Tianyi; Hu, Peida; Li, Haixia

    2016-12-18

    The gravity disturbance vector is one of the major error sources in high-precision and long-term inertial navigation applications. Specific to the inertial navigation systems (INSs) with high-order horizontal damping networks, analyses of the error propagation show that the gravity-induced errors exist almost exclusively in the horizontal channels and are mostly caused by deflections of the vertical (DOV). Low-frequency components of the DOV propagate into the latitude and longitude errors at a ratio of 1:1 and time-varying fluctuations in the DOV excite Schuler oscillation. This paper presents two gravity compensation methods using the Earth Gravitational Model 2008 (EGM2008), namely, interpolation from the off-line database and computing gravity vectors directly using the spherical harmonic model. Particular attention is given to the error contribution of the gravity update interval and computing time delay. It is recommended for the marine navigation that a gravity vector should be calculated within 1 s and updated every 100 s at most. To meet this demand, the time duration of calculating the current gravity vector using EGM2008 has been reduced to less than 1 s by optimizing the calculation procedure. A few off-line experiments were conducted using the data of a shipborne INS collected during an actual sea test. With the aid of EGM2008, most of the low-frequency components of the position errors caused by the gravity disturbance vector have been removed and the Schuler oscillation has been attenuated effectively. In the rugged terrain, the horizontal position error could be reduced at best 48.85% of its regional maximum. The experimental results match with the theoretical analysis and indicate that EGM2008 is suitable for gravity compensation of the high-precision and long-term INSs.

  7. Summaries of research and development activities by using JAEA computer system in FY2007. April 1, 2007 - March 31, 2008

    International Nuclear Information System (INIS)

    2008-11-01

    Center for Computational Science and e-Systems (CCSE) of Japan Atomic Energy Agency (JAEA) installed large computer systems including super-computers in order to support research and development activities in JAEA. This report presents usage records of the JAEA computer system and the big users' research and development activities by using the computer system in FY2007 (April 1, 2007 - March 31, 2008). (author)

  8. 77 FR 15142 - Updated Nuclear Regulatory Commission Fiscal Years 2008-2013 Strategic Plan

    Science.gov (United States)

    2012-03-14

    ... 2008-2013 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Strategic plan. SUMMARY: The U...-1614, Volume 5, ``U.S. Nuclear Regulatory Commission, Fiscal Years [FY] 2008-2013 Strategic Plan,'' dated February 2012. The updated FY 2008-2013 strategic plan describes the agency's mission and...

  9. Laboratory Directed Research and Development Program FY 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    editor, Todd C Hansen

    2009-02-23

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operate unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2008 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). The LDRD program supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under

  10. Laboratory Directed Research and Development Program FY 2008 Annual Report

    International Nuclear Information System (INIS)

    Hansen, Todd C.

    2009-01-01

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operate unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2008 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). The LDRD program supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the

  11. Synergy for a Strong Future FY 2008

    International Nuclear Information System (INIS)

    Devore, L.; Chrzanowski, P.

    2008-01-01

    Lawrence Livermore National Security, LLC is committed to delivering the best combination of scientific research, technology development, business management, and safe, secure operations in support of Lawrence Livermore National Laboratory's critical national security mission. LLNS was formed specifically to manage LLNL for the Department of Energy's National Nuclear Security Administration. LLNS consists of a team of five organizations renowned for their expertise and accomplishments throughout the U.S. nuclear weapons complex and beyond - Bechtel National, University of California, Babcock and Wilcox, Washington Division of URS Corporation, and Battelle. Bechtel is the nation's largest engineering and construction firm and a leader in project management. The University of California is the world's largest public research institution. Babcock and Wilcox and the Washington Division of URS Corporation are top nuclear facilities contractors and between them manage four of DOE's five safest sites. Battelle is a global leader in science and technology development and commercialization. The LLNS Board of Governors provides oversight for the management of the Laboratory and holds the Director and LLNS President responsible for the Laboratory's performance. The Board has seven standing committees that assist in assessing Laboratory performance and monitoring risks and internal controls. Through the Board of Governors, the Laboratory can reach back to LLNS partner organizations to help ensure that it fulfills its national security mission with excellence in scientific research, technology development, business management, and safe, secure operations. LLNS assumed management of LLNL on October 1, 2007. This report highlights LLNS accomplishments in FY2008, its first year as the Laboratory's managing contractor. It is clear that LLNS and the Laboratory have exploited numerous synergies inherent in their relationship - for example, science and engineering, mission and

  12. Frequency and cost of claims by injury type from a state workers' compensation fund from 1998 through 2008.

    Science.gov (United States)

    Mroz, Tracy M; Carlini, Anthony R; Archer, Kristin R; Wegener, Stephen T; Hoolachan, Jordan I; Stiers, William; Shore, Rebecca A; Castillo, Renan C

    2014-06-01

    To determine which work-related injuries are the most frequent and costly. Secondary analysis of workers' compensation claims data. Data were provided by a large, Maryland workers' compensation insurer from 1998 through 2008. Not applicable. None. For 45 injury types, the number of claims and compensation amount was calculated for total compensation and for medical and indemnity compensation separately. Back and knee injuries were the most frequently occurring single injury types, whereas heart attack and occupational disease were the most expensive in terms of mean compensation. When taking into account both the frequency and cost of injury (mean cost × number occurrences), back, knee, and shoulder injuries were the most expensive single injury types. Successful prevention and management of back, knee, and shoulder injuries could lead to a substantial reduction in the burden associated with work-related injuries. Copyright © 2014 American Congress of Rehabilitation Medicine. Published by Elsevier Inc. All rights reserved.

  13. Tanks Focus Area Site Needs Assessment - FY 2001

    Energy Technology Data Exchange (ETDEWEB)

    Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.; Nickola, Cheryl L.

    2001-04-30

    The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, from collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.

  14. Hydrologic resources management program and underground test area operable unit fy 1997

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D. F., LLNL

    1998-05-01

    This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

  15. Design Study for a Low-Enriched Uranium Core for the High Flux Isotope Reactor, Annual Report for FY 2008

    Energy Technology Data Exchange (ETDEWEB)

    Primm, Trent [ORNL; Chandler, David [ORNL; Ilas, Germina [ORNL; Miller, James Henry [ORNL; Sease, John D [ORNL; Jolly, Brian C [ORNL

    2009-03-01

    This report documents progress made during FY 2008 in studies of converting the High Flux Isotope Reactor (HFIR) from highly enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel. Conversion from HEU to LEU will require a change in fuel form from uranium oxide to a uranium-molybdenum alloy. With axial and radial grading of the fuel foil and an increase in reactor power to 100 MW, calculations indicate that the HFIR can be operated with LEU fuel with no degradation in reactor performance from the current level. Results of selected benchmark studies imply that calculations of LEU performance are accurate. Scoping experiments with various manufacturing methods for forming the LEU alloy profile are presented.

  16. Fiscal Year 2008 Agency Financial Report

    National Research Council Canada - National Science Library

    2008-01-01

    The Department of Defense (DoD) Fiscal Year (FY) 2008 Agency Financial Report (AFR) provides the President, Congress, other federal departments and agencies, and the American public an overview of the Department's financial condition...

  17. Damping Inter-area Oscillations using Static Synchronous Series Compensator (SSSC)

    DEFF Research Database (Denmark)

    Su, Chi; Chen, Zhe

    2011-01-01

    Static synchronous series compensator (SSSC) has the ability to emulate a reactance in series with the connected transmission line. When fed with some supplementary signals from the connected system, SSSC is able to participate in the power system inter-area oscillation damping by changing...... the compensated reactance. This paper analyses the influence of SSSC on power system small signal stability. A SSSC damping controller scheme is presented and discussed. In DIgSILENT PowerFactory software, modal analysis and time-domain simulation are conducted in a single-machine infinite bus system model...... and a four-machine two-area test system model to verify and improve the damping controller scheme....

  18. FY 2009 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — Published: February 2008 Pages: 37 This Supplement to the President`s Fiscal Year FY 2009 Budget provides a technical summary of the budget request for the...

  19. Mathematical simulation for compensation capacities area of pipeline routes in ship systems

    Science.gov (United States)

    Ngo, G. V.; Sakhno, K. N.

    2018-05-01

    In this paper, the authors considered the problem of manufacturability’s enhancement of ship systems pipeline at the designing stage. The analysis of arrangements and possibilities for compensation of deviations for pipeline routes has been carried out. The task was set to produce the “fit pipe” together with the rest of the pipes in the route. It was proposed to compensate for deviations by movement of the pipeline route during pipe installation and to calculate maximum values of these displacements in the analyzed path. Theoretical bases of deviation compensation for pipeline routes using rotations of parallel section pairs of pipes are assembled. Mathematical and graphical simulations of compensation area capacities of pipeline routes with various configurations are completed. Prerequisites have been created for creating an automated program that will allow one to determine values of the compensatory capacities area for pipeline routes and to assign quantities of necessary allowances.

  20. Ecological Compensation Mechanism in Water Conservation Area: A Case Study of Dongjiang River

    Directory of Open Access Journals (Sweden)

    Kong Fanbin

    2015-07-01

    Full Text Available The appropriate economic compensation from downstream to upstream watershed is important to solve China’s social and economic imbalances between regions and can potentially enhance water resources protection and ecological security. The study analyzes the implementation of ecological compensation policy and related legal basis under ecological compensation mechanism theory and practice patterns, based on current natural environment and socio-economic development of national origin in Dongjiang water conservation areas. Under the principle of “Users pay”, the Dongjiang River is the subject of ecological compensation and recipient. By using the “cost-benefit analysis” and “cost method of industrial development opportunity”, we estimate that the total ecological compensation amounted to 513.35 million yuan. When estimated by the indicators such as water quantity, water quality and water use efficiency, we establish the “environmental and ecological protection cost sharing model” and measure the total cost of protecting downstream watershed areas, the Guangdong Province, is about 108.61 million yuan. The implementation of the Dongjiang source region that follows the principles of ecological compensation and approaches are also designed

  1. Summary of environmental characterization activities at the Oak Ridge National Laboratory Solid Waste Storage Area Six, FY 1986 through 1987

    International Nuclear Information System (INIS)

    Davis, E.C.; Solomon, D.K.; Dreier, R.B.; Lee, S.Y.; Kelmers, A.D.; Lietzke, D.A.; Craig, P.M.

    1987-01-01

    The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP), has supported characterization activities in Solid Waste Storage Area (SWSA 6) to acquire information necessary for identification and planning of remedial actions that may be warranted, and to facilitate eventual closure of the site. In FY 1986 investigations began in the areas of site hydrology, geochemistry, soils, geology, and geohydrologic model application. This report summarizes work carried out in each of these areas during FY's 1986 and 1987 and serves as a status report pulling together the large volume of data that has resulted. Characterization efforts are by no means completed; however, a sufficient data base has been generated to begin data interpretation and analysis of site contaminants

  2. Annual report of Fusion Research and Development Directorate of JAEA for FY2008 and FY2009

    International Nuclear Information System (INIS)

    Isei, Nobuaki

    2011-03-01

    This annual report provides an overview of major results and progress on research and development (R and D) activities at Fusion Research and Development Directorate of Japan Atomic Energy Agency (JAEA) for FY2008 (from April 1, 2008 to March 31, 2009) and FY2009 (from April 1, 2009 to March 31, 2010), including those performed in collaboration with other research establishments of JAEA, research institutes, and universities. Concerning the ITER project, JAEA was nominated as the domestic agency by the Japanese government after the ITER Agreement took effect, and has fulfilled the obligations. In the development of superconducting conductors, JAEA constructed a technical platform for the fabrication of superconducting conductors for toroidal field (TF) coils ahead of other countries. JAEA immediately started and completed the construction of a plant to fabricate superconducting conductors, and started their fabrication ahead of other countries. In the development of gyrotron high-frequency heating equipment, since only the JAEA satisfies the ITER's procurement specifications among supplier countries, the ITER Organization requested JAEA to conduct confidence tests, and achieved results such as data acquisition that could contribute to the development of the ITER's operational scenario. For the development of neutral beam injectors, advantages of the multi-stage acceleration system developed by JAEA was recognized as a result of comparative experiments with single-stage acceleration systems developed in Europe for the particle acceleration system, and was adopted in the ITER's technical specifications. For the Broader Approach (BA) activities, JAEA was designated as the implementing agency by the Japanese government after the BA Agreement took effect, and has fulfilled the obligations and promoted three projects in the BA activities steadily through domestic cooperation and coordination with Europe. Concerning activities related to the International Fusion Energy

  3. Enhanced surveillance program FY97 accomplishments. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Mauzy, A. [ed.; Laake, B. [comp.

    1997-10-01

    This annual report is one volume of the Enhanced Surveillance Program (ESP) FY97 Accomplishments. The complete accomplishments report consists of 11 volumes. Volume 1 includes an ESP overview and a summary of selected unclassified FY97 program highlights. Volume 1 specifically targets a general audience, reflecting about half of the tasks conducted in FY97 and emphasizing key program accomplishments and contributions. The remaining volumes of the accomplishments report are classified, organized by program focus area, and present in technical detail the progress achieved in each of the 104 FY97 program tasks. Focus areas are as follows: pits; high explosives; organics; dynamics; diagnostics; systems; secondaries; nonnuclear materials; nonnuclear components; and Surveillance Test Program upgrades.

  4. A plan for administrative computing at ANL FY1991 through FY1993

    Energy Technology Data Exchange (ETDEWEB)

    Caruthers, L.E. (ed.); O' Brien, D.E.; Bretscher, M.E.; Hischier, R.C.; Moore, N.J.; Slade, R.G.

    1990-10-01

    In July of 1988, Argonne National Laboratory management approved the restructuring of Computing Services into the Computing and Telecommunications Division, part of the Physical Research area of the Laboratory. One major area of the Computing and Telecommunications Division is Management Information Systems (MIS). A significant aspect of Management Information Systems' work is the development of proposals for new and enhanced administrative computing systems based on an analysis of informational needs. This document represent the outcome of the planning process for FY1991 through FY1993. The introduction of the FY1991 through FY1993 Long-Range Plan assesses the state of administrative computing at ANL and the implications of FY1991 funding recommendations. It includes a history of MIS planning for administrative data processing. This document discusses the strategy and goals which are an important part of administrative data processing plans for the Laboratory. It also describes the management guidelines established by the Administrative Data Processing Oversight Committee for the proposal and implementation of administrative computing systems. Summaries of the proposals for new or enhanced administrative computing systems presented by individual divisions or departments with assistance of Management Information Systems, to the Administrative Data Processing Oversight Committee are given. The detailed tables in this paper give information on how much the resources to develop and implement a given systems will cost its users. The tables include development costs, computing/operations costs, software and hardware costs, and efforts costs. They include both systems funded by Laboratory General Expense and systems funded by the users themselves.

  5. Summary of environmental characterization activities at the Oak Ridge National Laboratory Solid Waste Storage Area Six, FY 1986 through 1987

    Energy Technology Data Exchange (ETDEWEB)

    Davis, E.C.; Solomon, D.K.; Dreier, R.B.; Lee, S.Y.; Kelmers, A.D.; Lietzke, D.A. (Oak Ridge National Lab., TN (United States)); Craig, P.M. (Environmental Consulting Engineers, Inc., Knoxville, TN (United States))

    1987-09-30

    The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP), has supported characterization activities in Solid Waste Storage Area (SWSA 6) to acquire information necessary for identification and planning of remedial actions that may be warranted, and to facilitate eventual closure of the site. In FY 1986 investigations began in the areas of site hydrology, geochemistry, soils, geology, and geohydrologic model application. This report summarizes work carried out in each of these areas during FY's 1986 and 1987 and serves as a status report pulling together the large volume of data that has resulted. Characterization efforts are by no means completed; however, a sufficient data base has been generated to begin data interpretation and analysis of site contaminants.

  6. Southeastern Power Administration 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-12-29

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2008 Annual Report for your review. The information included in this document reflects our agency’s programs, accomplishments, operational and financial activities for the 12-month period beginning October 1, 2007 and ending September 30, 2008. Southeastern marketed more than 4.5 billion kilowatt-hours of energy to 491 wholesale customers in ten southeastern states this past year. Revenues from the sale of this power totaled approximately $263 million. Drought conditions persisted in the southeastern region of the United States during FY 2008 placing strains on our natural and financial resources. Power purchases for FY 2008 totaled $91 million. Approximately $44 million of this amount was for replacement power which is paid only during adverse water conditions in order to meet our customers’ contract requirements. With the continued financial assistance and support of our Federal power customers, funding for capitalized equipment purchases and replacements at U.S. Army Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for these aging facilities. Southeastern’s cyber and physical security programs continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation (NERC) standards and requirements. In the coming year, Southeastern will continue open communication and cooperation with DOE, the Federal power customers, and the Corps to maximize the benefits of our region’s water resources. Although competing uses of water and the prolonged drought conditions will present another challenging year for our agency, Southeastern’s employees will meet these challenges and continue to provide reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E.Legg Administrator

  7. Defense: FY2017 Budget Request, Authorization, and Appropriations

    Science.gov (United States)

    2016-04-12

    adjusted the limits on defense and non-defense spending —each time adjusting only the limits for the two succeeding years. 13 Nevertheless, each of... employee hour worked . The Bureau of Labor Statistics reports the ECI which is computed from compensation cost data collected from a sample of jobs...with $9.6 billion in mandatory spending , brought the Administration’s total FY2017 National Defense budget request to $619.5 billion. In shaping the

  8. Bend compensated large-mode-area fibers: achieving robust single-modedness with transformation optics.

    Science.gov (United States)

    Fini, John M; Nicholson, Jeffrey W

    2013-08-12

    Fibers with symmetric bend compensated claddings are proposed, and demonstrate performance much better than conventional designs. These fibers can simultaneously achieve complete HOM suppression, negligible bend loss, and mode area >1000 square microns. The robust single-modedness of these fibers offers a path to overcoming mode instability limits on high-power amplifiers and lasers. The proposed designs achieve many of the advantages of our previous (asymmetric) bend compensation strategy in the regime of moderately large area, and are much easier to fabricate and utilize.

  9. Fiscal year 1992 report on archaeological surveys of the 100 Areas, Hanford Site, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Wright, M.K.

    1993-09-01

    During FY 1992, the Hanford Cultural Resources Laboratory (HCRL) conducted a field survey of the 100-HR-3 Operable Unit (600 Area) and tested three sites near the 100 Area reactor compounds on the US Department of Energy`s Hanford Site at the request of Westinghouse Hanford Company. These efforts were conducted in compliance with Section 106 of the National Historic Preservation Act (NHPA) and are part of a cultural resources review of 100 Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization studies.The results of the FY 1992 survey and test excavation efforts are discussed in this report. 518 ha in the 100-HR-3 Operable Unit and conducted test excavations at three prehistoric sites near the 100-F and 100-K reactors to determine their eligibility for listing on the National Register of Historic Places.

  10. NREL Partnership Survey - FY 2016 Results

    Energy Technology Data Exchange (ETDEWEB)

    2016-09-01

    The National Renewable Energy Laboratory (NREL) conducts an annual partnership satisfaction survey in which we ask our clients to rate NREL in a number of areas. As a national laboratory, the principal areas we focus on include value, timeliness, quality, price, and capabilities. This fact sheet shows the results of a survey with 300 customers responding to 11 questions using ratings that vary from 'strongly agree' to 'strongly disagree.' In FY 16, 100% of the scores improved or were equal to FY 15 numbers.

  11. Repository Technology Program activities, FY 1988

    International Nuclear Information System (INIS)

    Yow, J.L. Jr.; Wijesinghe, A.M.; Thorpe, R.K.; Knapp, R.B.

    1989-07-01

    Our technical activities in FY 1988 included instrument selection and evaluation, calculational work, and simulator development. Near the end of the fiscal year, we began preparing several topical reports to document our results. This fiscal year, we continued developing three-dimensional numerical simulators to model coupled hydrologic-and mechanical-rock mass responses and, thus, to provide representative numerical tools for understanding and calculating these in situ processes. We also began scoping calculations in the second half of FY 1988 to evaluate ERE design criteria, but this work was redirected late in the year when the DOE/AECL Subsidiary Agreement was set aside. Our work in developing and evaluating experimental techniques focused on total pressure measurements, moisture content measurement, and tracer detection instrumentation for sealing experiments and for rock-mass-response field tests. At the end of the fiscal year, we completed a review of measurement technology for instrumenting migration/sorption tests to help define the technological requirements in these areas. By the end of FY 1988, we had completed a review of the existing codes for simulating reactive transport; we are using the results of this review to help formulate plans for future activities in this area. The following sections describe the major RTP tasks and activities at LLNL in more detail, and they include our FY 1988 accomplishments in these areas. 8 refs., 22 figs

  12. Oak Ridge National Laboratory Institutional Plan FY 1984-FY 1989

    International Nuclear Information System (INIS)

    1983-11-01

    In this plan, Oak Ridge National Laboratory (ORNL) continues to be committed to scientific and technological research that is based on technical excellence and innovation and that provides a foundation for and a stimulus to broader and more sustained economic growth. DOE is being asked to assist in establishing a new program for Laboratory cooperation with industry, beginning with an initial focus on materials science. The current Institutional Plan thus projects growth in the materials science area as well as in other basic physical science areas and suggests a new initiative designed to extend the various technology transfer activities and to make them more effective by using ORNL as the trial Laboratory for some of these different approaches. This Institutional Plan projects a stable future for ORNL, with only modest amounts of growth in selected areas of research for the FY 1984-FY 1989 planning cycle. Summaries of the overall picture of the proposed budget and personnel levels for the current planning cycle are included. Scientific programs, laboratory resource development, and private sector interactions are discussed

  13. Radiation Area Remedial Action FY 1996 summary report

    International Nuclear Information System (INIS)

    Hayward, W.M.

    1996-11-01

    The Radiation Area Remedial Action (RARA) project is responsible for the interim stabilization and maintenance of the majority of the inactive waste sites at the Hanford Site. These waste sites include approximately 400 individual sites and 4,000 acres. Three facilities were removed from the RARA list near the end of fiscal year (FY) 1996P: the 218-W-4B, 218-E-10, and 218-E-12B Burial Grounds. These three facilities are treatment, storage, and disposal (TSD) sites assigned to Fluor Daniel Hanford. Therefore, the RARA project will no longer perform activities on the inactive portions to maintain clear lines of responsibility (fully with Fluor Daniel Hanford). RARA activities are broken into two broad categories: interim stabilization, and surveillance and maintenance (S and M). Interim stabilization addresses major corrective actions for sites with radioactive surface contamination. A site continues to require S and M once it has received interim stabilization. Vegetation management is a significant activity under the RARA project. The goal is to control vegetation that may grow and spread radioactive contamination

  14. Aligning clinical compensation with clinical productivity: design and implementation of the financial value unit (FVU) system in an academic department of internal medicine.

    Science.gov (United States)

    Stites, Steven; Steffen, Patrick; Turner, Scott; Pingleton, Susan

    2013-07-01

    A new metric was developed and implemented at the University of Kansas School of Medicine Department of Internal Medicine, the financial value unit (FVU). This metric analyzes faculty clinical compensation compared with clinical work productivity as a transparent means to decrease the physician compensation variability and compensate faculty equitably for clinical work.The FVU is the ratio of individual faculty clinical compensation compared with their total work relative value units (wRVUs) generated divided by Medical Group Management Association (MGMA) salary to wRVUs of a similar MGMA physician.The closer the FVU ratio is to 1.0, the closer clinical compensation is to that of an MGMA physician with similar clinical productivity. Using FVU metrics to calculate a faculty salary gap compared with MGMA median salary and wRVU productivity, a divisional production payment was established annually.From FY 2006 to FY 2011, both total faculty numbers and overall clinical activity increased. With the implementation of the FVU, both clinical productivity and compensation increased while, at the same time, physician retention rates remained high. Variability in physician compensation decreased. Dramatic clinical growth was associated with the alignment of clinical work and clinical compensation in a transparent and equable process.

  15. Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project: FY 1994--FY 2001

    International Nuclear Information System (INIS)

    1993-12-01

    This Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993

  16. FY16-20 Strategic Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Harwell, Amber Suzanne [Sandia National Lab. (SNL-CA), Livermore, CA (United States)

    2015-07-01

    Welcome to our FY16–FY20 Strategic Plan, which both refects our continued dedication to the work we do and reinforces the importance of the integrated Laboratories’ strategic framework to our future. This document is the result of the leadership team’s journey over the past few years in response to the needs of our nation. In an external environment that continues to change, sometimes in unexpected ways, it is critical that our mission areas and our foundation become increasingly synergistic, forming a whole whose parts are interdependent.

  17. Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

    1992-09-01

    In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy's Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan

  18. Canada-USA Salmon Shelf Survival Study, 2007-2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Trudel, Marc; Tucker, Strahan; Morris, John

    2009-03-09

    Historically, salmon stocks from the Columbia River and Snake River formed one of the most valuable fisheries on the west coast of North America. However, salmon and steelhead returns sharply declined during the 1980s and 1990s to reach nearly 1 million fish. Although several factors may be responsible for the decline of Columbia River salmon and steelhead, there is increasing evidence that these drastic declines were primarily attributable to persistently unfavorable ocean conditions. Hence, an understanding of the effects of ocean conditions on salmon production is required to forecast the return of salmon to the Columbia River basin and to assess the efficacy of mitigation measures such as flow regulation on salmon resources in this system. The Canadian Program on High Seas Salmon has been collecting juvenile salmon and oceanographic data off the west coast of British Columbia and Southeast Alaska since 1998 to assess the effects of ocean conditions on the distribution, migration, growth, and survival of Pacific salmon. Here, we present a summary of the work conducted as part of the Canada-USA Salmon Shelf Survival Study during the 2008 fiscal year and compare these results with those obtained from previous years. The working hypothesis of this research is that fast growth enhances the marine survival of salmon, either because fast growing fish quickly reach a size that is sufficient to successfully avoid predators, or because they accumulate enough energy reserves to better survive their first winter at sea, a period generally considered critical in the life cycle of salmon. Sea surface temperature decreased from FY05 to FY08, whereas, the summer biomass of phytoplankton increased steadily off the west coast of Vancouver Island from FY05 to FY08. As in FY07, zooplankton biomass was generally above average off the west coast of Vancouver Island in FY08. Interestingly, phytoplankton and zooplankton biomass were higher in FY08 than was expected from the observed

  19. State Library Agency Survey: Fiscal Year 2008

    Science.gov (United States)

    Henderson, Everett; Miller, Kim; Farrell, Michele; Brock, Faye; Dorinski, Suzanne; Freeman, Michael; Frid, Lisa; Hardesty, Laura; Music, Christopher; O'Shea, Patricia; Sheckells, Cindy

    2009-01-01

    This report marks the third release of library statistics data from the Institute of Museum and Library Services (IMLS). It contains data on state library agencies in the 50 states and the District of Columbia for state fiscal year (FY) 2008. The data were collected through the State Library Agencies (StLA) Survey, the product of a cooperative…

  20. FY08 VPP Program Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Dossett, Sharon D.

    2008-01-01

    The Voluntary Protection Program (VPP) is a recognized third-party certification of worker safety and health program excellence, based on industry best practices that focus on management leadership and employee involvement, as well as other safety and health program elements. This Pacific Northwest National Laboratory (PNNL) VPP Program Evaluation is the FY-2008 report of the PNNL VPP Steering Committee regarding the status of VPP at PNNL. It is an update of the previous annual report dated January, 2007 and was completed in January 2008. An annual evaluation of the status of VPP is required of all sites that participate in the DOE-VPP. This report provides a detailed summary of the PNNL VPP Steering Committee’s evaluation of program performance and documents both strengths and improvement opportunities related to the various aspects of the VPP model.

  1. Present status of refining and conversion facility dismantling. Progress in first half of 2010FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2011-06-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  2. Present status of refining and conversion facility dismantling. Progress in first half of 2009FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2010-03-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2009FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  3. Research on deep electromagnetic induction methods (Fy 1985)

    Energy Technology Data Exchange (ETDEWEB)

    Murakami, Hiroshi; Uchida, Toshihiro; Tanaka, Shin' ichi

    1987-06-01

    Geological Survey of Japan started from FY 1984 a research of deep electomagnetic induction methods as a part of the research on deep geothermal resources prospecting technology, the Sunshine Project. This article is the report of its second fiscal year. These methods are a generic term of the methods to survey specific resistance structure in the deep part of the earth by utilizing the technique of the electromagnetic induction method and the time domain CSMT method aiming to survey about estimated depth of 5Km as well as the CA method to estimate the general structure of the earth of the depth of 5Km or more are now being developed. This article reports the respective methods separately. Concerning the former, the reception of useful signals were successfully made during the FY 1984 field experiment and based on this, field experiments in a geothermal area were conducted in FY 1985 verifying its effectivenss. With regard to the latter, following FY 1984, CA observations were conducted in the northern part of Tohoku Region and the deep specific resistance structure in a wide area was surveyed. (43 figs, 1 tab, 11 refs)

  4. Photovoltaic Subcontract Program, FY 1990

    Energy Technology Data Exchange (ETDEWEB)

    Summers, K.A. (ed.)

    1991-03-01

    This report summarizes the progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaics Program at the Solar Energy Research Institute (SERI). The SERI subcontracted PV research and development represents most of the subcontracted R D that is funded by the US Department of Energy (DOE) National Photovoltaics Program. This report covers fiscal year (FY) 1990: October 1, 1989 through September 30, 1990. During FY 1990, the SERI PV program started to implement a new DOE subcontract initiative, entitled the Photovoltaic Manufacturing Technology (PVMaT) Project.'' Excluding (PVMaT) because it was in a start-up phase, in FY 1990 there were 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of those subcontracts were with universities, at a total funding of over $3.3 million. Cost sharing by industry added another $4.3 million to that $11.9 million of SERI PV subcontracted R D. The six technical sections of this report cover the previously ongoing areas of the subcontracted program: the Amorphous Silicon Research Project, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs discuss approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports the progress since its inception in FY 1990. Highlights of technology transfer activities are also reported.

  5. The investigation of identifying method on grass fire by FY-3 VIRR images

    Science.gov (United States)

    Jiang, Youyan; Han, Tao; Wang, Dawei

    2018-03-01

    Grassland fire has the characteristics of fierce fire and rapid spreading, and many fires occur in sparsely populated places. Satellite remote sensing has the characteristics of fast imaging period and wide coverage, and plays an important role in the rapid monitoring and evaluation of grassland fire. FY-3 satellite has been widely used since its launch in September 2008, and this paper uses the fire information of Gansu grassland from 2011 to 2016, based on the more mature MODIS and NOAA-AVHRR fire identification method. The results show that the accuracy of FY-3/VIRR satellite data fire detection are higher than that of NOAA-AVHRR satellite, and the accuracy of FY-3/VIRR satellite data is described. There is a greater improvement, the ability to identify slightly worse than the MODIS satellite, the region is relatively large fire detection accuracy is higher.

  6. Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

    1992-09-01

    In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy`s Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan.

  7. Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

    1992-09-01

    In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy's Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan.

  8. Department of the Army - The Fiscal Year 2008 Military Personnel, Army Appropriation and the Antideficiency Act

    Science.gov (United States)

    2010-06-22

    of the Army, U.S. Army Audit Agency, Budgeting for the Military Personnel, Army Appropriation, Report No. A-2010-0028- FFM (Jan. 6, 2010); Department...of the Army, U.S. Army Audit Agency, Military Personnel, Army FY 05 Subsistence Charges, Report No. A-2008-0037- FFM (Feb. 12, 2008); Department of

  9. Testing EGM2008 on Leveling Data from Scandinavia, Adjacent Baltic Areas, and Greenland

    DEFF Research Database (Denmark)

    Strykowski, Gabriel; Forsberg, René

    2010-01-01

    We tested EGM2008 on GPS/leveling data from Scandinavia and adjacent areas. EGM2008 performs at the same level as the best regional geoid model, NKG2004. However, the direct evaluation of EGM2008 is difficult in Greenland because no leveling data are available. Nevertheless, we show on 78 GPS-MSS...

  10. 78 FR 54835 - Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead...

    Science.gov (United States)

    2013-09-06

    ... 4] Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead... Troy 2008 Lead nonattainment area (hereafter referred to as the ``Troy Area'' or ``Area''). The Troy... submittal regarding the attainment plan based on Alabama's attainment demonstration for the Troy Area. The...

  11. Annual report of the Neutron Irradiation and Testing Reactor Center. FY 2008. April 1, 2008 - March 31, 2009

    International Nuclear Information System (INIS)

    2009-09-01

    The JMTR, one of the most high flux test reactors in the world, has been used for the irradiation experiments of fuels and materials related to LWRs, fundamental research and radioisotope productions. The JMTR was stopped at the beginning of August 2006 to conduct refurbishment works, and the reoperation will be planned from FY 2011. After reoperation, the JMTR will contribute to many fields, such as the lifetime extension of LWRs, expansion of industrial use, progress of science and technology. This report summarizes the activities on refurbishment works, development of new irradiation techniques, enhancement of reactor availability, etc. (author)

  12. 76 FR 18259 - Announcement Regarding Delaware Triggering “on” Tier Four of Emergency Unemployment Compensation...

    Science.gov (United States)

    2011-04-01

    ... Triggering ``on'' Tier Four of Emergency Unemployment Compensation 2008 (EUC08) AGENCY: Employment and...'' Tier Four of Emergency Unemployment Compensation 2008 (EUC08). Public Law 111-312 extended provisions... the EUC08 program for qualified unemployed workers claiming benefits in high unemployment states. The...

  13. Institutional plan FY 2004 - FY 2008

    International Nuclear Information System (INIS)

    Beggs, S. D.

    2004-01-01

    Argonne's mission is to serve DOE and national security by advancing the frontiers of knowledge, by creating and operating forefront scientific user facilities, and by providing innovative and effective approaches and solutions to energy, environmental, and security challenges to national and global well-being, in the near and long term, as a contributing member of the DOE laboratory system. We contribute significantly to DOE's mission in science, energy resources, environmental stewardship, and national security, with lead roles in the areas of science, operation of scientific facilities, and energy. In accomplishing our mission, we partner with DOE, other federal laboratories and agencies, the academic community, and the private sector. Argonne is pursuing ten visionary strategic goals to deliver extraordinary science and technology with significant value to the nation: (1) Develop the technologies and infrastructure needed to produce, store, and distribute hydrogen fuel. (2) Close the nuclear fuel cycle, reducing the cost of nuclear waste disposal by billions of dollars and disposing of weapons-grade plutonium and actinides. (3) Develop advanced nuclear power technologies that are safe, economical, proliferation-resistant, and environmentally sustainable. (4) Plan, design, construct, and operate the Rare Isotope Accelerator (RIA) and make fundamental discoveries in nuclear physics and astrophysics. (5) Construct and operate the Center for Nanoscale Materials and create innovative materials with valuable commercial properties. (6) Lead the Genomes to Life team that focuses on protein production and related proteomics; implement computational biology to build fundamental understanding of living systems. (7) Realize the full potential of scientific simulation to solve mission-related problems, through leading-edge research on systems architecture and software, parallel programming and numerical tools, distributed computing, and computational science applications

  14. Environmental compensation with forest plantings; Compensacoes ambientais na forma de plantios florestais

    Energy Technology Data Exchange (ETDEWEB)

    Ozorio, Tarcisio Faria; Alves, Anibal Jose Constantino; Paulucci, Valdemir Antonio; Raul, Vanderlei Lourenco; Martini, Andrea Dietrich; Melo Neto, Joao Evangelista de; Lima, Silvia Ferreira de [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The compensation plantings required for the license process of work and activities that influence permanent preservation areas are being implemented for the pipeway maintenance services of TRANSPETRO in the State of Sao Paulo. Because of the agreement firmed with public power, the Company contracted a specialized firm to the crops of 13,500 seedlings during the 2007-year. This year (2008), the plantings must be concluded, remaining only the maintenance of those. (author)

  15. Present status of refining and conversion facility dismantling. Progress in latter half of 2010FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2011-09-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  16. 77 FR 8219 - Notice of Indirect Cost Rates for the Office of National Marine Sanctuaries for Fiscal Years 2008...

    Science.gov (United States)

    2012-02-14

    ... requirements. C&C also determined that the most appropriate indirect allocation method was the Direct Labor... most appropriate indirect allocation method for the development of the FY 2008 and 2009 indirect cost... October 1, 2008 and present, using the Direct Labor Cost base allocation methodology. For cases that have...

  17. Active Sites Environmental Monitoring Program. FY 1993: Annual report

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Ashwood, T.L.; Hicks, D.S.; Marsh, J.D.

    1994-08-01

    This report continues a series of annual and semiannual reports that present the results of the Active Sites Environmental Monitoring Program (ASEMP) monitoring activities. The report details monitoring data for fiscal year (FY) 1993 and is divided into three major areas: SWSA 6 [including tumulus pads, Interim Waste Management Facility (IWMF), and other sites], the low-level Liquid-Waste Solidification Project (LWSP), and TRU-waste storage facilities in SWSA 5 N. The detailed monitoring methodology is described in the second revision of the ASEMP program plan. This report also presents a summary of the methodology used to gather data for each major area along with the results obtained during FY 1993

  18. The Sandia MEMS passive shock sensor : FY08 design summary.

    Energy Technology Data Exchange (ETDEWEB)

    Walraven, Jeremy Allen; Baker, Michael Sean; Clemens, Rebecca C.; Mitchell, John Anthony; Brake, Matthew Robert; Epp, David S.; Wittwer, Jonathan W.

    2008-11-01

    This report summarizes design and modeling activities for the MEMS passive shock sensor. It provides a description of past design revisions, including the purposes and major differences between design revisions but with a focus on Revisions 4 through 7 and the work performed in fiscal year 2008 (FY08). This report is a reference for comparing different designs; it summarizes design parameters and analysis results, and identifies test structures. It also highlights some of the changes and or additions to models previously documented [Mitchell et al. 2006, Mitchell et al. 2008] such as the way uncertainty thresholds are analyzed and reported. It also includes dynamic simulation results used to investigate how positioning of hard stops may reduce vibration sensitivity.

  19. Audit and Evaluation Plan FY 2002

    National Research Council Canada - National Science Library

    2002-01-01

    .... These projects also have been coordinated in the joint audit and inspection planning groups that address coverage in each major functional area. The plan also includes audit policy and oversight projects planned to start in FY 2002; however, intelligence coverage will be addressed separately.

  20. Alternative Electrochemical Salt Waste Forms, Summary of FY11-FY12 Results

    Energy Technology Data Exchange (ETDEWEB)

    Riley, Brian J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mccloy, John S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Crum, Jarrod V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lepry, William C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rodriguez, Carmen P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Windisch, Charles F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Matyas, Josef [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Westman, Matthew P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rieck, Bennett T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lang, Jesse B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Olszta, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pierce, David A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-01-17

    The Fuel Cycle Research and Development Program, sponsored by the U.S. Department of Energy Office of Nuclear Energy, is currently investigating alternative waste forms for wastes generated from nuclear fuel processing. One such waste results from an electrochemical separations process, called the “Echem” process. The Echem process utilizes a molten KCl-LiCl salt to dissolve the fuel. This process results in a spent salt containing alkali, alkaline earth, lanthanide halides and small quantities of actinide halides, where the primary halide is chloride with a minor iodide fraction. Pacific Northwest National Laboratory (PNNL) is concurrently investigating two candidate waste forms for the Echem spent-salt: high-halide minerals (i.e., sodalite and cancrinite) and tellurite (TeO2)-based glasses. Both of these candidates showed promise in fiscal year (FY) 2009 and FY2010 with a simplified nonradioactive simulant of the Echem waste. Further testing was performed on these waste forms in FY2011 and FY2012 to assess the possibility of their use in a sustainable fuel cycle. This report summarizes the combined results from FY2011 and FY2012 efforts.

  1. EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann

    2008-09-16

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  2. 76 FR 80407 - Notice of a Change in Status of the Payable Periods in the Emergency Unemployment Compensation...

    Science.gov (United States)

    2011-12-23

    ... Payable Periods in the Emergency Unemployment Compensation 2008 (EUC08) Program for Texas AGENCY... Four of Emergency Unemployment Compensation 2008 (EUC08) for weeks of unemployment beginning December... claiming benefits in high unemployment states. The Department of Labor produces a trigger notice indicating...

  3. Environmental Systems Research and Analysis FY 2000 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    David L. Miller; Castle, Peter Myer; Steven J. Piet

    2001-01-01

    The Environmental Systems Research (ESR) Program, a part of the Environmental Systems Research and Analysis (ESRA) Program, was implemented to enhance and augment the technical capabilities of the INEEL. Strengthening the Technical capabilities of the INEEL will provide the technical base to serve effectively as the Environmental Management Laboratory for the Office of Environmental Management (EM). This is a progress report for the third year of the ESR Program (FY 2000). A report of activities is presented for the five ESR research investment areas: (1) Transport Aspects of Selective Mass Transport Agents, (2) Chemistry of Environmental Surfaces, (3) Materials Dynamics, (4) Characterization Science, and (5) Computational Simulation of Mechanical and Chemical Systems. In addition to the five technical areas, the report describes activities in the Science and Technology Foundations element of the program, e.g., interfaces between ESR and the EM Science Program (EMSP) and the EM Focus Areas. The five research areas are subdivided into 18 research projects. FY 2000 research in these 18 projects has resulted in more than 50 technical papers that are in print, in press, in review, or in preparation. Additionally, more than 100 presentations were made at professional society meetings nationally and internationally. Work supported by this program was in part responsible for one of our researchers, Dr. Mason Harrup, receiving the Department of Energy’s “Bright Light” and “Energy at 23” awards. Significant accomplishments were achieved. Non-Destructive Assay hardware and software was deployed at the INEEL, enhancing the quality and efficiency of TRU waste characterization for shipment. The advanced tensiometer has been employed at numerous sites around the complex to determine hydrologic gradients in variably saturated vadose zones. An ion trap, secondary ion mass spectrometer (IT-SIMS) was designed and fabricated to deploy at the INEEL site to measure the

  4. Hydrologic resources management program, FY 1998 progress report; FINAL

    International Nuclear Information System (INIS)

    Benedict, F.C.; Criss, R.E.; Davisson, M.L.; Eaton, G.F.; Hudson, G.B.; Kenneally, J.M.; Rose, T.P.; Smith, D.

    1999-01-01

    This report presents the results from FY 1998 technical studies conducted by Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area (UGTA) project. The HRMP is sponsored by Defense Programs (DP) of the U.S. Department of Energy, Nevada Operations Office (DOE/NV), and supports DP operations at the Nevada Test Site (NTS) through studies of radiochemistry and resource management related to the defense programs mission. Other participating organizations include the Los Alamos National Laboratory (LANL), the United States Geological Survey (USGS), the Desert Research Institute (DRI) of the University of Nevada, the United States Environmental Protection Agency (EPA), and Bechtel-Nevada (BN). The UGTA project is an Environmental Management (EM) activity of DOE/NV that supports a Federal Facilities Agreement and Consent Order between the Department of Energy, the Department of Defense, and the State of Nevada. UGTA's primary function is to address the legacy release of hazardous constituents at the Nevada Test Site, the Tonopah Test Range, and off-Nevada Test Site underground nuclear testing areas. Participating contractors include LLNL (Earth and Environmental Sciences Directorate, Analytical and Nuclear Chemistry Division), LANL, DRI, USGS, BN, HSI-GeoTrans, and IT Corporation. The FY 1998 HRMP and UGTA annual progress report follows the organization and contents of our FY 1997 report (Smith et al., 1998), and includes our results from CY 1997-1998 technical studies of radionuclide migration and isotope hydrology at the Nevada Test Site. During FY 1998, LLNL continued its efforts under the HRMP to pursue a technical agenda relevant to the science-based stockpile stewardship program at DOE/NV. Support to UGTA in FY 1998 included efforts to quantitatively define the radionuclide source term residual from underground nuclear weapons testing and the derivative solution, or hydrologic source

  5. Compensation claims for occupational noise induced hearing loss between 1998 and 2008: yearly incidence rates and trends in older workers.

    Science.gov (United States)

    Radi, Samia; Benke, Geza; Schaafsma, Frederieke; Sim, Malcolm

    2016-04-01

    To estimate yearly incidence rates for occupational noise induced hearing loss (ONIHL) claims and to describe occupational factors in relation to age for incident cases in Victoria, Australia, between 1998 and 2008. All compensation claims lodged for deafness between 1 July 1998 and 30 June 2008 in the working population covered by the Victorian compensation scheme were analysed. Denominators were provided from 1999-2000 and incidence rates were expressed per 100,000 workers for each financial year. Overall, 81.2% of the 4,518 claims lodged were accepted. Successful claimants were predominantly males (96.5%) and claimants aged 56 to 65 years formed half the overall claims. The number of accepted claims was almost five times higher in 2007-08 than 1998-99. The highest rise was in claimants aged 56 years and above, particularly in those after retirement age. The number of claims and yearly incidence rates (IR) more than doubled over the period (240 claims and IR of 15.1 per 100,000 workers in 1999-2000 versus 669 claims and IR of 34.2 in 2007-08) with a sharp increase from 2004-05 to almost double within one single year and remained at high levels afterwards. The dramatic increase in eligible claims may reflect an increase in awareness of entitlements among workers eligible to make a successful claim. This awareness may be the result of increased opportunities for screening coinciding with changes in regulations. Older workers who worked in smaller workplaces may also be targeted by services providers as they combine occupational noise induced hearing loss (ONIHL) and presbycusis (hearing loss due to age), but this hypothesis needs further evaluation. © 2015 Public Health Association of Australia.

  6. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  7. E-Area Performance Assessment Interim Measures Assessment FY2005

    Energy Technology Data Exchange (ETDEWEB)

    Stallings, M

    2006-01-31

    After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway {sup 14}C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision.

  8. Tanks Focus Area retrieval process development and enhancements FY96 technology development summary report

    International Nuclear Information System (INIS)

    Rinker, M.W.; Bamberger, J.A.; Hatchell, B.K.

    1996-09-01

    The Retrieval Process Development and Enhancements (RPD ampersand E) activities are part of the Retrieval and Closure Program of the U.S. Department of Energy (DOE) EM-50 Tanks Focus Area. The purposes of RPD ampersand E are to understand retrieval processes, including emerging and existing technologies, and to gather data on those processes, so that end users have the requisite technical basis to make retrieval decisions. Work has been initiated to support the need for multiple retrieval technologies across the DOE complex. Technologies addressed during FY96 focused on enhancements to sluicing, borehole mining, confined sluicing retrieval end effectors, the lightweight scarifier, and pulsed air mixing. Furthermore, a decision tool and database have been initiated to link retrieval processes with tank closure to assist end users in making retrieval decisions

  9. Report of biological investigations at the Los Medanos Waste Isolation Pilot Plant (WIPP) area of New Mexico during FY 1978

    International Nuclear Information System (INIS)

    Best, T.L.; Neuhauser, S.

    1980-03-01

    The US Department of Energy is considering the construction of a Waste Isolation Pilot Plant (WIPP) in Eddy County, NM. This location is approximately 40 km east of Carlsbad, NM. Biological studies during FY 1978 were concentrated within a 5-mi radius of drill hole ERDA 9. Additional study areas have been established at other sites in the vicinity, e.g., the Gnome site, the salt lakes and several stations along the Pecos River southward from Carlsbad, NM, to the dam at Red Bluff Reservoir in Texas. The precise locations of all study areas are presented and their biology discussed

  10. Report of biological investigations at the Los Medanos Waste Isolation Pilot Plant (WIPP) area of New Mexico during FY 1978

    Energy Technology Data Exchange (ETDEWEB)

    Best, T.L.; Neuhauser, S. (eds.)

    1980-03-01

    The US Department of Energy is considering the construction of a Waste Isolation Pilot Plant (WIPP) in Eddy County, NM. This location is approximately 40 km east of Carlsbad, NM. Biological studies during FY 1978 were concentrated within a 5-mi radius of drill hole ERDA 9. Additional study areas have been established at other sites in the vicinity, e.g., the Gnome site, the salt lakes and several stations along the Pecos River southward from Carlsbad, NM, to the dam at Red Bluff Reservoir in Texas. The precise locations of all study areas are presented and their biology discussed.

  11. 76 FR 75562 - Notice of a Change in Status of the Payable Periods in the Emergency Unemployment Compensation...

    Science.gov (United States)

    2011-12-02

    ... Payable Periods in the Emergency Unemployment Compensation 2008 (EUC08) Program for Colorado AGENCY... Change in Status of the payable periods in the Emergency Unemployment Compensation 2008 (EUC08) program... claiming benefits in high unemployment states. The Department of Labor produces a trigger notice indicating...

  12. 77 FR 7604 - Notice of a Change in Status of the Payable Periods in the Emergency Unemployment Compensation...

    Science.gov (United States)

    2012-02-13

    ... Payable Periods in the Emergency Unemployment Compensation 2008 (EUC08) Program for Alaska AGENCY... status of the payable periods in the Emergency Unemployment Compensation 2008 (EUC08) program for Alaska... high unemployment states. The Department of Labor produces a trigger notice indicating which states...

  13. 76 FR 73685 - Notice of a Change in Status of the Payable Periods in the Emergency Unemployment Compensation...

    Science.gov (United States)

    2011-11-29

    ... Payable Periods in the Emergency Unemployment Compensation 2008 (EUC08) Program for Indiana, the Virgin... Unemployment Compensation 2008 (EUC08) program for Indiana, the Virgin Islands, West Virginia, and Wyoming... benefits in high unemployment states. The Department of Labor produces a trigger notice indicating which...

  14. Assessing patterns of human-wildlife conflicts and compensation around a Central Indian protected area.

    Directory of Open Access Journals (Sweden)

    Krithi K Karanth

    Full Text Available Mitigating crop and livestock loss to wildlife and improving compensation distribution are important for conservation efforts in landscapes where people and wildlife co-occur outside protected areas. The lack of rigorously collected spatial data poses a challenge to management efforts to minimize loss and mitigate conflicts. We surveyed 735 households from 347 villages in a 5154 km(2 area surrounding Kanha Tiger Reserve in India. We modeled self-reported household crop and livestock loss as a function of agricultural, demographic and environmental factors, and mitigation measures. We also modeled self-reported compensation received by households as a function of demographic factors, conflict type, reporting to authorities, and wildlife species involved. Seventy-three percent of households reported crop loss and 33% livestock loss in the previous year, but less than 8% reported human injury or death. Crop loss was associated with greater number of cropping months per year and proximity to the park. Livestock loss was associated with grazing animals inside the park and proximity to the park. Among mitigation measures only use of protective physical structures were associated with reduced livestock loss. Compensation distribution was more likely for tiger related incidents, and households reporting loss and located in the buffer. Average estimated probability of crop loss was 0.93 and livestock loss was 0.60 for surveyed households. Estimated crop and livestock loss and compensation distribution were higher for households located inside the buffer. Our approach modeled conflict data to aid managers in identifying potential conflict hotspots, influential factors, and spatially maps risk probability of crop and livestock loss. This approach could help focus allocation of conservation efforts and funds directed at conflict prevention and mitigation where high densities of people and wildlife co-occur.

  15. Assessing patterns of human-wildlife conflicts and compensation around a Central Indian protected area.

    Science.gov (United States)

    Karanth, Krithi K; Gopalaswamy, Arjun M; DeFries, Ruth; Ballal, Natasha

    2012-01-01

    Mitigating crop and livestock loss to wildlife and improving compensation distribution are important for conservation efforts in landscapes where people and wildlife co-occur outside protected areas. The lack of rigorously collected spatial data poses a challenge to management efforts to minimize loss and mitigate conflicts. We surveyed 735 households from 347 villages in a 5154 km(2) area surrounding Kanha Tiger Reserve in India. We modeled self-reported household crop and livestock loss as a function of agricultural, demographic and environmental factors, and mitigation measures. We also modeled self-reported compensation received by households as a function of demographic factors, conflict type, reporting to authorities, and wildlife species involved. Seventy-three percent of households reported crop loss and 33% livestock loss in the previous year, but less than 8% reported human injury or death. Crop loss was associated with greater number of cropping months per year and proximity to the park. Livestock loss was associated with grazing animals inside the park and proximity to the park. Among mitigation measures only use of protective physical structures were associated with reduced livestock loss. Compensation distribution was more likely for tiger related incidents, and households reporting loss and located in the buffer. Average estimated probability of crop loss was 0.93 and livestock loss was 0.60 for surveyed households. Estimated crop and livestock loss and compensation distribution were higher for households located inside the buffer. Our approach modeled conflict data to aid managers in identifying potential conflict hotspots, influential factors, and spatially maps risk probability of crop and livestock loss. This approach could help focus allocation of conservation efforts and funds directed at conflict prevention and mitigation where high densities of people and wildlife co-occur.

  16. 77 FR 11160 - Notice of a Change in Status of the Payable Periods in the Emergency Unemployment Compensation...

    Science.gov (United States)

    2012-02-24

    ... Payable Periods in the Emergency Unemployment Compensation 2008 (EUC08) Program for Connecticut and... announces a change in status of the payable periods in the Emergency Unemployment Compensation 2008 (EUC08... unemployed workers claiming benefits in high unemployment states. The Department of Labor produces a trigger...

  17. Photovoltaic Subcontract Program, FY 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    This report summarizes the fiscal year (FY) 1991 (October 1, 1990, through September 30, 1991) progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL) -- formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, the University Participation Program, and the Photovoltaic Manufacturing Technology (PVMaT) project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1991, and future research directions.

  18. FY 1993 task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1991-10-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to individuals and populations. The primary objective of work to be performed in FY 1993 is to complete the source term estimates and dose estimates for key radionuclides for the air and river pathways. At the end of FY 1993, the capability will be in place to estimate doses for individuals in the extended (32-county) study area, 1944--1991. Native American research will continue to provide input for tribal dose estimates. In FY 1993, the Technical Steering Panel (TSP) will decide whether demographic and river pathways data collection should be extended beyond FY 1993 levels. The FY 1993 work scopes and milestones in this document are based on the work plan discussed at the TSP Budget/Fiscal Subcommittee meeting on August 19--20, 1991. Table 1 shows the FY 1993 milestones; Table 2 shows estimated costs. The subsequent work scope descriptions are based on the milestones. This document and the FY 1992 task plans will form the basis for a contract with Battelle and the Centers for Disease Control (CDC). The 2-year dose reconstruction contract is expected to begin in February 1992. This contract will replace the current arrangement, whereby the US Department of Energy directly funds the Pacific Northwest Laboratory to conduct dose reconstruction work. In late FY 1992, the FY 1993 task plans will be more fully developed with detailed technical approaches, data quality objectives, and budgeted labor hours. The task plans will be updated again in July 1993 to reflect any scope, milestone, or cost changes directed during the year by the TSP. 2 tabs

  19. 77 FR 2091 - Notice of a Change in Status of the Payable Periods in the Emergency Unemployment Compensation...

    Science.gov (United States)

    2012-01-13

    ... Payable Periods in the Emergency Unemployment Compensation 2008 (EUC08) Program for Iowa and Oklahoma... Notice of a Change in Status of the payable period in the Emergency Unemployment Compensation 2008 (EUC08... unemployed workers claiming benefits in high unemployment states. The Department of Labor produces a trigger...

  20. Hydrologic Resources Management Program and Underground Test Area Project FY2005 Progress Report

    International Nuclear Information System (INIS)

    Eaton, G F; Genetti, V; Hu, Q; Hudson, G B; Kersting, A B; Lindvall, R E; Moran, J E; Nimz, G J; Ramon, E C; Rose, T P; Shuller, L; Williams, R W; Zavarin, M; Zhao, P

    2007-01-01

    This report describes FY 2005 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains five chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E and E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN)

  1. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  2. Scanning Mechanism of the FY-3 Microwave Humidity Sounder

    Science.gov (United States)

    Schmid, Manfred; Jing, Li; Hehr, Christian

    2010-01-01

    Astrium GmbH Germany, developed the scanning equipment for the instrument package of the MicroWave Humidity Sounder (MWHS) flying on the FY-3 meteorological satellite (FY means Feng Yun, Wind and Cloud) in a sun-synchronized orbit of 850-km altitude and at an inclination of 98.8 . The scanning mechanism rotates at variable velocity comprising several acceleration / deceleration phases during each revolution. The Scanning Mechanism contains two output shafts, each rotating a parabolic offset Antenna Reflector. The mechanism is operated in closed loop by means of redundant control electronics. MWHS is a sounding radiometer for measurement of global atmospheric water vapour profiles. An Engineering Qualification Model was developed and qualified and a first Flight Model was launched early 2008. The system is now working for more than two years successful in orbit. A second Flight Model of the Antenna Scanning Mechanism and of its associated control electronics was built and delivered to the customer for application on the follow-on spacecraft that will be launched by the end of 2010.

  3. Los Alamos Waste Management FY96 and FY97 Tactical Plan, March 1, 1996

    International Nuclear Information System (INIS)

    1996-01-01

    The Los Alamos National Laboratory (LANL) Waste Management Program (WMP) began a transition to become a open-quotes best of classclose quotes waste management program during fiscal year 1995 (FY95). A best of class waste management program means that LANL will provide cost-effective and compliant management of the minimum amount of waste. In FY94, the WMP could be characterized as a level of effort program requiring several new facilities and new LANL-developed technologies to carry out its waste management responsibilities. By the end of FY95, significant progress had been made in the transition to best of class. The FY96 WMP is realigned and reorganized. Its budget and scope of work are built upon discrete work packages. It is committed to achieving improved cost-effectiveness, providing significant tangible technical results, and to having its performance measured. During FY95, over $11,000,000 in facility and operational costs were avoided. The need for three new major facilities was reexamined and lower cost solutions, not requiring the development of new facilities, were agreed to. Technology development activities were terminated and replaced with the use of commercial facilities to achieve aggressive reductions in the Low-Level Mixed Waste legacy inventory. In addition, over $14,000,000 in improved cost-effectiveness has been included in the FY96 Baseline. An overall WMP vision, specific milestones, performance measures, and commitments are in place for FY96 to ensure that LANL continues the transition to a best of class waste management program. The following table identifies the overall vision and success indicators for FY96

  4. FY 1998 basic survey for coal resource development. Data collection of the joint research of new technology in the geophysical exploration of coal resources (land area shallow seam survey); 1998 nendo sekitan shigen kaihatsu kiso chosa shiryoshu. Shintansa gijutsu chosa kaihatsu (rikuiki senso tansa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This is a compilation of the data on the coal resource land area shallow seam survey conducted in FY 1998 as the basic survey for coal resource development. The trend survey was made from July 26 to August 6, 1998. The purposes of the survey are to study the image analysis method, examples of application of the reflection seismic survey to coal, and inversion technology. The data compilation includes the following: 1. Minutes of the proceedings of the FY 1998 Japan-Australia steering committee (in English). 2. Data/proceedings of the FY 1998 Japan-Australia technical study committee (in English). 3. Results of the GPS measurement of reflection seismic survey traverse lines in Caroona district. 4. List of parameters in the FY 1998 reflection seismic survey data processing. 5. Report on the work of inspection/repair of seismic pulse generator. 6. List of the data on diameter of the test boring conducted in FY 1998. 7. NEDO-DMR CAROONA DDH borehole core pictures. 8. Estimated curves. 9. Report on the trend survey of the FY 1998 coal resource development basic survey (land area shallow seam survey). 10. Pictures. 11. Data on the 1st (FY 1998) new exploration technology study committee. (NEDO)

  5. Nevada Test Site 2008 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    International Nuclear Information System (INIS)

    2009-01-01

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2008 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities

  6. Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)

    International Nuclear Information System (INIS)

    Higginson, M.C.

    1994-10-01

    The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford's environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO 3 plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996)

  7. Disability Insurance Applications Filed via the Internet - FY 2008-2011

    Data.gov (United States)

    Social Security Administration — This dataset provides monthly data at the national level from federal fiscal year 2008 - 2011 for initial Social Security Disability Insurance (SSDI) applications...

  8. FY 1999 Annual Self-Evaluation Report of the Pacific Northwest National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Randy R. LaBarge

    1999-11-05

    This is a report of the Pacific Northwest National Laboratory's (Pacific Northwest's) FY1999 Annual Self-Evaluation Report. This report summarizes our progress toward accomplishment of the critical outcomes, objectives, and performance indicators as delineated in the FY1999 Performance Evaluation & Fee Agreement. It also summarizes our analysis of the results of Pacific Northwest's Division and Directorate annual self-assessments, and the implementation of our key operational improvement initiatives. Together, these provide an indication of how well we have used our Integrated Assessment processes to identify and plan improvements for FY2000. As you review the report you will find areas of significantly positive progress; you will also note areas where I believe the Laboratory could make improvements. Overall, however, I believe you will be quite pleased to note that we have maintained, or exceeded, the high standards of performance we have set for the Laboratory.

  9. Annual Transportation Report for Radioactive Waste Shipments to and from the Nevada Test Site

    International Nuclear Information System (INIS)

    2009-01-01

    In February 1997, the U.S. Department of Energy (DOE), Nevada Operations Office (now known as the Nevada Site Office) issued the Mitigation Action Plan which addressed potential impacts described in the 'Final Environmental Impact Statement for the Nevada Test Site and Off-Site Locations in the State of Nevada' (DOE/EIS 0243). The U.S. Department of Energy, Nevada Operations Office committed to several actions, including the preparation of an annual report, which summarizes waste shipments to and from the Nevada Test Site (NTS) Radioactive Waste Management Site (RWMS) at Area 5 and Area 3. No shipments were disposed of at Area 3 in fiscal year (FY) 2008. This document satisfies requirements regarding low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) transported to or from the NTS during FY 2008. No transuranic (TRU) waste shipments were made from or to the NTS during FY 2008

  10. Active sites environmental monitoring program FY 1997 annual report

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Marshall, D.S.; Cunningham, G.R.

    1998-03-01

    This report summarizes the activities conducted by the Active Sites Environmental Monitoring Program (ASEMP) from October 1996 through September 1997. The purpose of the program is to provide early detection and performance monitoring at active low-level waste (LLW) disposal sites in Solid Waste Storage Area (SWSA) 6 and transuranic (TRU) waste storage sites in SWSA 5 North. This report continues a series of annual and semiannual reports that present the results of ASEMP monitoring activities. This report details monitoring results for fiscal year (FY) 1997 from SWSA 6, including the Interim Waste Management Facility (IWMF) and the Hillcut Disposal Test Facility (HDTF), and (2) TRU-waste storage areas in SWSA 5 N. This report presents a summary of the methodology used to gather data for each major area along with the FY 1997 results. Figures referenced in the text are found in Appendix A and data tables are presented in Appendix B

  11. Global Change Research: Summaries of research in FY 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This document describes the activities and products of the Global Research Program in FY 1993. This publication describes all of the projects funded by the Environmental Sciences Division of DOE under annual contracts, grants, and interagency agreements in FY 1993. Each description contains the project`s title; its 3-year funding history (in thousands of dollars); the period over which the funding applies; the name(s) of the principal investigator(s); the institution(s) conducting the projects; and the project`s objectives, products, approach, and results to date (for most projects older than 1 year). Project descriptions are categorized within the report according to program areas: climate modeling, quantitative links, global carbon cycle, vegetation research, ocean research, economics of global climate change, education, information and integration, and NIGEC. Within these categories, the descriptions are grouped alphabetically by principal investigator. Each program area is preceded by a brief text that defines the program area, states its goals and objectives, lists principal research questions, and identifies program managers.

  12. FY16 Strategic Themes White Paper.

    Energy Technology Data Exchange (ETDEWEB)

    Leland, Robert W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    The Science and Technology (S&T) Division 1000 Strategic Plan includes the Themes, Goals, and Actions for FY16. S&T will continue to support the Labs Strategic plan, Mission Areas and Program Management Units by focusing on four strategic themes that align with the targeted needs of the Labs. The themes presented in this plan are Mission Engagement, Bold Outcomes, Collaborative Environment, and the Safety Imperative. Collectively they emphasize diverse, collaborative teams and a self-reliant culture of safety that will deliver on our promise of exceptional service in the national interest like never before. Mission Engagement focuses on increasing collaboration at all levels but with emphasis at the strategic level with mission efforts across the labs. Bold Outcomes seeks to increase the ability to take thoughtful risks with the goal of achieving transformative breakthroughs more frequently. Collaborative environment strives for a self-aware, collaborative working environment that bridges the many cultures of Sandia. Finally, Safety Imperative aims to minimize the risk of serious injury and to continuously strengthen the safety culture. Each of these themes is accompanied by a brief vision statement, several goals, and planned actions to support those goals throughout FY16 and leading into FY17.

  13. FY 1990/FY 1991 Biennial Budget Descriptive Summaries for the Strategic Defense Initiative Organization

    Science.gov (United States)

    1989-01-01

    reduction in cryccooler size. o (U) Develop the first diamond ME_2 with monocrystalline , semiconductor quality thin-film diamcnd. o (U) Develop Atomic Layer...stiffness and dynamic response. A lightweight thermal radiator panel will also be fabricated and tested. Fabrication of tubes and sheets in gauges...FY 91 o Precision Gimbal Test IQ FY 91 C Cx:mlete Deveic..ent of Integrated Structures Model 2Q FY 91 c Light’weight Ccmpcsitas Radiator Panel Demo 2Q

  14. FY2017 Updates to the SAS4A/SASSYS-1 Safety Analysis Code

    Energy Technology Data Exchange (ETDEWEB)

    Fanning, T. H. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2017-09-30

    The SAS4A/SASSYS-1 safety analysis software is used to perform deterministic analysis of anticipated events as well as design-basis and beyond-design-basis accidents for advanced fast reactors. It plays a central role in the analysis of U.S. DOE conceptual designs, proposed test and demonstration reactors, and in domestic and international collaborations. This report summarizes the code development activities that have taken place during FY2017. Extensions to the void and cladding reactivity feedback models have been implemented, and Control System capabilities have been improved through a new virtual data acquisition system for plant state variables and an additional Block Signal for a variable lag compensator to represent reactivity feedback for novel shutdown devices. Current code development and maintenance needs are also summarized in three key areas: software quality assurance, modeling improvements, and maintenance of related tools. With ongoing support, SAS4A/SASSYS-1 can continue to fulfill its growing role in fast reactor safety analysis and help solidify DOE’s leadership role in fast reactor safety both domestically and in international collaborations.

  15. Results of Tritium Tracking and Groundwater Monitoring at the Hanford Site 200 Area State-Approved Land Disposal Site-FY 1999

    International Nuclear Information System (INIS)

    Barnett, D.B.

    1999-01-01

    The Hanford Site 200 Area Effluent Treatment Facility (ETF) processes contaminated liquids derived from Hanford Site facilities. The clean water generated by these processes is occasionally enriched in tritium and is discharged to the 200 Area State Approved Land Disposal Site (SALDS). Groundwater monitoring for tritium and other constituents is required by the state-issued permit at 21 wells surrounding the facility. During FY 1999, average tritium activities in most wells declined from average activities in 1998. The exception was deep well 69948-77C, where tritium results were at an all-time high (77,000 pCi/L) as a result of the delayed penetration of effluent deeper into the aquifer. Of the 12 constituents with permit enforcement limits, which are monitored in SALDS proximal wells, all were within limits during FY 1999. Water level measurements in nearby wells indicate that a small hydraulic mound exists around the SALDS facility as a result of discharges. This feature is directing groundwater flow radially outward a short distance before the regional northeasterly flow predominates. Evaluation of this condition indicates that the network is currently adequate for tracking potential effects of the SALDS on the groundwater. Recommendations include the discontinuation of ammonia, benzene, tetrahydrofuran, and acetone from the regular groundwater constituent list; designating background well 299-W8-1 as a tritium-tracking well only, and the use of quadruplicate averages of field pH, instead of a single laboratory measurement, as a permit compliance parameter

  16. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2013 and FY2014

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Julianne J. [Desert Research Inst. (DRI), Las Vegas, NV (United States); Nikolich, George [Desert Research Inst. (DRI), Las Vegas, NV (United States); Mizell, Steve [Desert Research Inst. (DRI), Las Vegas, NV (United States); McCurdy, Greg [Desert Research Inst. (DRI), Las Vegas, NV (United States); Campbell, Scott [Desert Research Inst. (DRI), Las Vegas, NV (United States)

    2016-09-01

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. Emphasis is given to collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans that are being developed, which will facilitate appropriate closure design and postclosure monitoring. Desert Research Institute installed two meteorological monitoring stations south (station number 1) and north (station number 2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA in 2011. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters is recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during FY2013 and FY2014.

  17. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2013 and FY2014

    International Nuclear Information System (INIS)

    Miller, Julianne J.; Nikolich, George; Mizell, Steve; McCurdy, Greg; Campbell, Scott

    2016-01-01

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. Emphasis is given to collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans that are being developed, which will facilitate appropriate closure design and postclosure monitoring. Desert Research Institute installed two meteorological monitoring stations south (station number 1) and north (station number 2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA in 2011. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters is recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during FY2013 and FY2014.

  18. Annual Performance Report - FY 2011

    Science.gov (United States)

    This report summarizes OIG activity, performance, results, and challenges, and provides a financial accounting of resources for fiscal year (FY) 2011 compared to our FY 2011 annual performance targets.

  19. High performance computing and communications: FY 1997 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  20. Compensation of Emergency Medical Technician (EMT)-Basics and Paramedics.

    Science.gov (United States)

    Studnek, Jonathan R

    2016-12-01

    The objective of this paper is to identify factors associated with compensation for Emergency Medical Technician (EMT)-Basics and Paramedics and assess whether these associations have changed over the period 1999-2008. Data obtained from the Longitudinal EMT Attributes and Demographic Study (LEADS) surveys, a mail survey of a random, stratified sample of nationally certified EMT-Basics and Paramedics, were analyzed. For the 1999-2003 period, analyses included all respondents providing Emergency Medical Services (EMS). With the addition of a survey in 2004 about volunteers, it was possible to exclude volunteers from these analyses. Over 60% of EMT-Basics reported being either compensated or noncompensated volunteers in the 2004-2008 period. This was substantially and significantly greater than the proportion of EMT-Paramedic volunteers (Technician (EMT)-Basics and Paramedics. Prehosp Disaster Med. 2016;31(Suppl. 1):s87-s95.

  1. Effect in Protecting Cultivated Land of New Construction Land Compensation Fee%新增建设用地使用费的耕地保护绩效测算

    Institute of Scientific and Technical Information of China (English)

    丁宁; 金晓斌; 唐健; 张志宏; 赵婕; 宋佳楠; 周寅康

    2011-01-01

    论文以农用地转用环节征收数额较大、改革相对较早的新增建设用地土地有偿使用费为研究对象,应用2003—2008年省级面板数据,建立土地有偿使用费征收率与建设占用耕地面积间动态变化的计量经济函数,采用混合OLS模型加以估计,并在此基础上对土地有偿使用费政策的耕地保护绩效进行测算。研究结果表明:①2003—2008年间,土地有偿使用费征收率每提高1元/m2,每省每年约能减少耕地占用面积47.26 hm2;②2003—2008年土地有偿使用费政策实施累计抑制建设占用耕地面积152 410.00 hm2,其耕地保护%Land taxes and fees have played an important role in protecting farmland and improving the efficiency of land use.This paper studies new construction land compensation fee,which is charged in comparatively large amounts and has experienced a long term of reform.Its effects in cultivated land protection can make a good reference to the improvement and perfection of the land taxes and fees system.The province-level panel data from 2003 to 2008 was used in the research to establish the econometric model that describes the dynamic changes between the charging rate of new construction compensation fee and cultivated land occupation area by construction.The mixed OLS model was applied to estimate the equations and the cultivated land preservation effect of new construction compensation fee was assessed by computing estimated decreased areas of cultivated land occupation with and without new construction land compensation fee policy in effect.The estimated results of model shows that the variables’ sign symbols were consistent with expected and the t test was significant at 10% level.The model can be used to calculate the direct effects and relative effects of new construction land compensation fee on cultivated land preservation.The main conclusions of the research are: 1) The cultivated land occupation reduced by about 47.26 hm2 with

  2. FY 1999 report on the data processing of the geothermal development promotion survey. No. B-6 Tsujinodake area (Tertiary); 1999 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No.B-6 Tsujinodake chiiki (dai 3 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-01-01

    For the purpose of confirming the existence of geothermal reservoirs, this survey was conducted as Survey B in the range of 30km{sup 2} east of Lake Ikeda at the south east end of Satsuma Peninsula, Kagoshima pref. from FY 1997 to FY 1999. By the geology/alteration zone survey, fluid geochemical survey, electromagnetic survey and gravity survey which were conducted in FY 1997 as surface survey, the following three were extracted as the areas which have great potentiality of geothermal resource existence: 1) area along the Yamakawa-Matsugakubo structure line on which calderas and explosion craters lie (north part); 2) area along the Takeyama-Tsujinodake structure line on which Ata central dome volcanic rocks lie (central part); 3) area around Kozukahama where the south wall of the Ata caldera extends in east-west direction (south part). In the survey after that, in north part, it was considered that aquicludes in clayey alteration zone were widely distributed around levels of 100m above - 200m below sea level and there existed geothermal reservoirs under the aquicludes. It was presumed that the mixed water of sea water and surface water was thermally conducted by heat sources of 300-490 degrees C and geothermal reservoirs of 260-270 degrees C were formed. (NEDO)

  3. LSTA Allotments (FY 2003-2016)

    Data.gov (United States)

    Institute of Museum and Library Services — Review Library Services and Technology Act (LSTA) allotments by state from FY 2003 to FY 2016. The Grants to States program is the largest source of federal funding...

  4. Ethanol annual report FY 1990

    Energy Technology Data Exchange (ETDEWEB)

    Texeira, R.H.; Goodman, B.J. (eds.)

    1991-01-01

    This report summarizes the research progress and accomplishments of the US Department of Energy (DOE) Ethanol from Biomass Program, field managed by the Solar Energy Research Institute, during FY 1990. The report includes an overview of the entire program and summaries of individual research projects. These projects are grouped into the following subject areas: technoeconomic analysis; pretreatment; cellulose conversion; xylose fermentation; and lignin conversion. Individual papers have been indexed separately for inclusion on the data base.

  5. Pengaruh Sistem Manajemen Mutu ISO 9001:2008 dan Kompensasi Terhadap Kinerja Guru di SMA Darul Ulum 2 Unggulan BPPT Jombang

    Directory of Open Access Journals (Sweden)

    Mochamad Yusuf

    2017-12-01

    Full Text Available This article discusses the influence of the ISO 9001:2008 quality management system and compensation for teacher performance in SMA Darul Ulum 2 Unggulan BPPT Jombang. The purpose of this research is: to know the influence of SMM 9001:2008 implementation to the teacher performance; to know the influence of the compensation for teacher performance; to find out the influence of the SMM ISO 9001:2008 implementation and the compensation simultaneously on the teacher performance. This is a correlational research with an expost facto approach. The population of this study are all teachers in SMA Darul Ulum 2 Unggulan BPPT Jombang that amounted to 92 people. The methods of data collection in this study using questionnaires. Based on the research conducted, it was concluded that the implementation of ISO 9001:2008 quality management system and the the compensation either apart or together are very closely related to the teacher performance in Darul Ulum 2 SMA Unggulan BPPT Jombang.

  6. FY 10 Multifamily Initial Endorsements

    Data.gov (United States)

    Department of Housing and Urban Development — In FY 2010, HUD's Multifamily's 18 Hubs initially endorsed 1011 loans totaling $11.3 billion and providing 170,672 units/ beds. FY 10's $11.3 billion is the highest...

  7. Photovoltaic Subcontract Program. Annual report, FY 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project, PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.

  8. Annual Report: Photovoltaic Subcontract Program FY 1991

    Energy Technology Data Exchange (ETDEWEB)

    Summers, K. A. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    1992-03-01

    This report summarizes the fiscal year (FY) 1991 (October 1, 1990, through September 30, 1991) progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High Efficiency Concepts, the New Ideas Program, the University Participation Program, and the Photovoltaic Manufacturing Technology (PVMaT) project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1991, and future research directions.

  9. Photovoltaic Program Branch annual report, FY 1989

    Energy Technology Data Exchange (ETDEWEB)

    Summers, K A [ed.

    1990-03-01

    This report summarizes the progress of the Photovoltaic (PV) Program Branch of the Solar Energy Research Institute (SERI) from October 1, 1988, through September 30, 1989. The branch is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year (FY) 1989, this included nearly 50 subcontracts, with a total annualized funding of approximately $13.1 million. Approximately two-thirds of the subcontracts were with universities, at a total funding of nearly $4 million. The six technical sections of the report cover the main areas of the subcontracted program: Amorphous Silicon Research, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, New Ideas, and University Participation. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1989, and future research directions. Each report will be cataloged individually.

  10. Measuring change in health care equity using small-area administrative data - evidence from the English NHS 2001-2008.

    Science.gov (United States)

    Cookson, Richard; Laudicella, Mauro; Donni, Paolo Li

    2012-10-01

    This study developed a method for measuring change in socio-economic equity in health care utilisation using small-area level administrative data. Our method provides more detailed information on utilisation than survey data but only examines socio-economic differences between neighbourhoods rather than individuals. The context was the English NHS from 2001 to 2008, a period of accelerated expenditure growth and pro-competition reform. Hospital records for all adults receiving non-emergency hospital care in the English NHS from 2001 to 2008 were aggregated to 32,482 English small areas with mean population about 1500 and combined with other small-area administrative data. Regression models of utilisation were used to examine year-on-year change in the small-area association between deprivation and utilisation, allowing for population size, age-sex composition and disease prevalence including (from 2003 to 2008) cancer, chronic kidney disease, coronary heart disease, diabetes, epilepsy, hypertension, hypothyroidism, stroke, transient ischaemic attack and (from 2006 to 2008) atrial fibrillation, chronic obstructive pulmonary disease, obesity and heart failure. There was no substantial change in small-area associations between deprivation and utilisation for outpatient visits, hip replacement, senile cataract, gastroscopy or coronary revascularisation, though overall non-emergency inpatient admissions rose slightly faster in more deprived areas than elsewhere. Associations between deprivation and disease prevalence changed little during the period, indicating that observed need did not grow faster in more deprived areas than elsewhere. We conclude that there was no substantial deterioration in socio-economic equity in health care utilisation in the English NHS from 2001 to 2008, and if anything, there may have been a slight improvement. Copyright © 2012 Elsevier Ltd. All rights reserved.

  11. Stalking and compensation for existential damage. Some remarks starting from the sentences of the Court of Cassation (Supreme Court of November 11, 2008 - Le stalking et l’indemnisation du dommage existentiel. Quelques considérations suite aux jugements de la Cour de Cassation en Chambres Unies du 11 novembre 2008 - Stalking e risarcimento del danno esistenziale. Alcune considerazioni alla luce delle sentenze della Corte di Cassazione a Sezioni Unite dell’11 novembre 2008

    Directory of Open Access Journals (Sweden)

    Florio M.

    2009-05-01

    Full Text Available A few days ago, a regulation against stalking was introduced into the Italian system, inserting the art. 612 bis into the Italian penal code. The author considers the new set of rules, aiming to defend the stalking victim, and the prospects of compensation for damage to the person. Above all, puts more emphasis on the analysis of compensation for existential damage, which is now accepted to be repayable as a result of the important sentences of the Court of Cassation in 2008, when definite criteria were established. From now on, such criteria for a systematic analysis of compensation for existential damage will be a reference point for the Italian Courts.

  12. Construction of tissue compensating filters for extended areas in Hodgkin-irradiation on the basis of moire topography

    International Nuclear Information System (INIS)

    Binder, W.; Cabaj, A.; Kaercher, K.H.; Windischbauer, G.; Tieraerztliche Hochschule, Vienna

    1977-01-01

    In order to obtain a homogeneous distribution of the dose over extended fields in radiotherapy of Hodgkin's disease, for an exact dose within the irradiated region it is necessary to consider the topography of the patient. The skin protective build-up effect due to the use of bolus materials would be lost with telecobalt irradiation, and therefore tissue compensating filters with a large surface are to be preferred. A simple method of making such filters by means of the moire topography is described. The way to obtain a compensation filter for extended areas is demonstrated by an example showing how to construct it from layered lead plates. (orig./HP) [de

  13. Official holidays in 2008 and end-of-year closure 2008/2009

    CERN Multimedia

    HR Department

    2007-01-01

    (Application of Articles R II 4.38 and R II 4.39 of the Staff Regulations) Official holidays in 2008 (in addition to the end-of-year holidays) : Friday 21st March (Good Friday); Monday, 24th March (Easter Monday); Thursday,1st May (Ascension day); Friday 2nd May (Compensation of 1st May); Monday, 12th May (Whit Monday); Thursday, 11th September ("Jeûne genevois"). Annual closure of the site of the Organization during the Christmas holidays and day of special leave granted by the Director-General : the Laboratory will be closed from Saturday, 20th December 2008 to Sunday, 4th January 2009 inclusive (without deduction of annual leave). The first working day in the New Year will be Monday, 5th January 2009. Human Resources Department Tel. 73903

  14. Southwestern Power Administration Annual Report 2008

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-12-01

    Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

  15. Driving forces behind the construction of an eco-compensation mechanism for wetlands in China

    Science.gov (United States)

    Wang, Changhai

    2016-09-01

    This research revealed important driving forces behind the construction of an eco-compensation mechanism for wetlands (DFEMW) in China. Using China's provincial panel data from 1978 to 2008, a fixed-effects model was used to analyze the impacts of agricultural production systems on wetlands. We identified three DFEMW as follows: the change of wetland resources and protection measures in China; declaration and implementation of the provincial Wetland Protection Ordinance; and wetland degradation by agricultural production systems, which necessitated the establishment of a wetland eco-compensation mechanism. In addition to the DFEMW, a significant positive correlation between wetland area and both rural population and gross agricultural production was identified, in addition to a negative correlation with chemical fertilizer usage, reservoir storage capacity, and irrigation area. The underlying reasons for the serious degradation and inadequate protection of wetlands were market failure and government failure; these were the driving forces behind the need to establish a wetland eco-compensation mechanism. From a governmental perspective, it has been difficult to rectify market failures in resource distribution and thus to prevent wetland degradation. Factors include conflicts of interest, lack of investment, effective special laws, a simple means to protect wetlands, and a multidisciplinary management system. Therefore, the key factor is the coordination of interest relationships between those who utilize wetlands and those who seek to minimize wetland degradation and effectively protect wetlands.

  16. FY08 Engineering Research and Technology Report

    Energy Technology Data Exchange (ETDEWEB)

    Minichino, C; McNichols, D

    2009-02-24

    This report summarizes the core research, development, and technology accomplishments in Lawrence Livermore National Laboratory's Engineering Directorate for FY2008. These efforts exemplify Engineering's more than 50-year history of developing and applying the technologies needed to support the Laboratory's national security missions. A partner in every major program and project at the Laboratory throughout its existence, Engineering has prepared for this role with a skilled workforce and technical resources developed through both internal and external venues. These accomplishments embody Engineering's mission: 'Enable program success today and ensure the Laboratory's vitality tomorrow.' Engineering's mission is carried out through basic research and technology development. Research is the vehicle for creating competencies that are cutting-edge, or require discovery-class groundwork to be fully understood. Our technology efforts are discipline-oriented, preparing research breakthroughs for broader application to a variety of Laboratory needs. The term commonly used for technology-based projects is 'reduction to practice.' As we pursue this two-pronged approach, an enormous range of technological capabilities result. This report combines our work in research and technology into one volume, organized into thematic technical areas: Engineering Modeling and Simulation; Measurement Technologies; Micro/Nano-Devices and Structures; Engineering Systems for Knowledge and Inference; and Energy Manipulation. Our investments in these areas serve not only known programmatic requirements of today and tomorrow, but also anticipate the breakthrough engineering innovations that will be needed in the future.

  17. Hanford, diversification, and the Tri-Cities Economy FY 1998

    International Nuclear Information System (INIS)

    SCOTT, M.J.

    1999-01-01

    The missions of the U.S. Department of Energy's Richland Operations Office (DOE/RL) are to safely manage the Hanford Site, to manage and clean up its legacy wastes, and to develop and deploy new science and technology in the environmental and energy fields. Collectively, DOE/RL and its contractors are the most important single entity in the Tri-Cities local economy (Pasco, Kennewick, and Richland, Washington, and the surrounding area). Although the relevant economic region affected by DOE/RL and its contractors actually embraces a geographic area reaching from Yakima in the west to Walla Walla in the east and from Moses Lake in the north to Pendleton, Oregon, in the south, over 90% of economic impacts likely occur in Benton and Franklin Counties. These two counties are defined as the ''local'' Tri-Cities economy for purposes of this study (see Figure 1). In the federal fiscal year (IV) 1998 (October 1, 1997 through September 30, 1998), the total impact of DOEs local $1.6 billion budget was felt through payrolls of $519 million and local purchases of goods and services of $246 million. The total local spending of $765 million was down slightly from the FY 1997 total of $774 million. Taking into account the slightly greater multiplier effects of this spending due to changes in its mix, the DOE/RL budget sustained an estimated 36% of all local employment (31,200 out of 86,000 jobs) and up to 64% of local wage income ($1.55 billion out of $2.40 billion). This was up slightly from the year before (29,500 jobs, $1.49 billion income). DOE budget increases in FY 1999 are expected to result in a net increase of about 200 local DOE contractor jobs over the September 30, 1998 level, or about equal to the FY 1998 average. In addition, economic diversification more than offset the impact of the local DOE losses in FY 1998 and, together with an initial economic boost from privatization of Hanford's tank waste cleanup, is expected to play a significant expansive role in FY 1999

  18. Aeromagnetic survey in Eurajoensalmi, Olkiluoto 2008

    International Nuclear Information System (INIS)

    Levaeniemi, H.

    2008-08-01

    This report describes the survey operation, survey and processing methods and the deliverables of an aerogeophysical survey in Olkiluoto area in April 2008. The survey was conducted by Geological Survey of Finland (GTK). The survey aircraft was a twin-engine Twin Otter operated by Finnish Aviation Academy (SIO) and owned by Natural Environment Research Council / British Geological Survey (NERC / BGS), with whom GTK has established a joint venture called Joint Airborne-geoscience Capability (JAC). The survey was conducted in April 2008 during six days. The survey consists of six separate survey flights, one of which was a magnetic calibration flight. The survey was based in Pori airport. Survey line spacing was 50 meters and nominal survey altitude was 30 meters. Measurements were completed in April 2008, and data processing and reporting was done in June 2008. Two cesium magnetometers installed onboard the aircraft (at the left wingtip and in a nose cone) were measuring the magnetic total field intensity during the survey flights. An automatic compensation unit corrected the aircraft attitude errors in the magnetic data in real time. In addition to magnetic measurement, auxiliary parameters such as flight altitude and aircraft attitude were also recorded simultaneously. Reference ground base station was used for recording the temporal variations in the magnetic field and also reference data for post-positioning of coordinate information. In the post-processing phase, heading correction, base station correction and microlevelling procedures were applied to the magnetic data. The data was exported to numeric XYZ files and interpolated into grid data file. A noteworthy local detail present in the survey and in the processing was the massive power line. For safety reasons, flight altitude had to be increased and survey lines had to be cut short in the vicinity of the powerline. However, due to reasonable planning of the survey area boundaries, this caused no great

  19. 100 Area D4 Project Building Completion Report: December 2008 to December 2009

    International Nuclear Information System (INIS)

    Finucane, K.G.; Harrie, J.P.

    2010-01-01

    This report documents the final status of buildings after the completion of D4 activities at the 100 Area of the U.S. Department of Energy Hanford Site from December 1, 2008, to December 31, 2009. The following buildings are included in this report: 11-N Change Room; 13-N Storage Building; 107-N Basin Recirculation Facility; 108-N Chemical Unloading Facility; 183-ND Resin Disposal Pit; 183-F Clearwells; 188-D Ash Disposal Pit; 1524-N Hazardous Waste Storage Pad; 1525-N Laydown Storage Area; 1607-Ni Sewage Tank; 1607-N2 Sewage Tank; 1706-NA Sewage Lift Station; 1904-D Outfall Structure; MO-013 Mobile Office Trailer; MO-422 Mobile Office Trailer; and MO-999 Mobile Office Trailer. Demolition debris and soil associated with completion of these buildings were disposed at the Environmental Restoration Disposal Facility (ERDF), located at the Hanford Site. Postdemolition direct hand instrument surveys and Global Positioning Environmental Radiological Survey (GPERS) surveys were performed on excavations after loadout of debris and prior to backfill. The 100 Area D4/Interim Safe Storage (ISS) project personnel worked a total of approximately 137,930 hours (manual and non-manual, not including subcontractors) from December 1, 2008, to December 31, 2009. During this time there were 10 Occupational Safety and Health Administration (OSHA) recordable injuries, two of which involved lost time. There also were 27 first aid cases during this time period. No clothing contamination and no skin contamination incidents occurred during demolition of the 100 Area buildings. Workers received 7,350.2 person-mrem of radiological exposure from December 1, 2008, to December 31, 2009 during their support of D4 activities associated with the buildings discussed in this report. All boundary air sample results were below procedural action levels for the duration of the work performed.

  20. Geophysical investigations in the 100 Areas: Fiscal year 1991 through December 1993

    Science.gov (United States)

    Mitchell, T. H.

    1994-09-01

    The geophysical investigations identified in this document were conducted by the Westinghouse Hanford Company (WHC) Surface Geophysics Team, Geophysics Group, between October, 1991 and December, 1993. The investigations supported 100-Area activities for the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensations and Liability Act of 1980 (CERCLA). The primary intent of this document is to provide a general map location and the associated document number for investigations that have been conducted as of December, 1993. The results of the individual investigations are not included here. The results of all of these investigations have been previously reported individually in WHC supporting documents. The investigations conducted during Fiscal Year (FY) 1992 are summarized in a single WHC document, WHC-SD-EN-TI-204, Rev. O. A brief summary of some of the successful applications of geophysics in the 100-Areas is included.

  1. Railway Crossing Risk Area Detection Using Linear Regression and Terrain Drop Compensation Techniques

    Science.gov (United States)

    Chen, Wen-Yuan; Wang, Mei; Fu, Zhou-Xing

    2014-01-01

    Most railway accidents happen at railway crossings. Therefore, how to detect humans or objects present in the risk area of a railway crossing and thus prevent accidents are important tasks. In this paper, three strategies are used to detect the risk area of a railway crossing: (1) we use a terrain drop compensation (TDC) technique to solve the problem of the concavity of railway crossings; (2) we use a linear regression technique to predict the position and length of an object from image processing; (3) we have developed a novel strategy called calculating local maximum Y-coordinate object points (CLMYOP) to obtain the ground points of the object. In addition, image preprocessing is also applied to filter out the noise and successfully improve the object detection. From the experimental results, it is demonstrated that our scheme is an effective and corrective method for the detection of railway crossing risk areas. PMID:24936948

  2. Railway Crossing Risk Area Detection Using Linear Regression and Terrain Drop Compensation Techniques

    Directory of Open Access Journals (Sweden)

    Wen-Yuan Chen

    2014-06-01

    Full Text Available Most railway accidents happen at railway crossings. Therefore, how to detect humans or objects present in the risk area of a railway crossing and thus prevent accidents are important tasks. In this paper, three strategies are used to detect the risk area of a railway crossing: (1 we use a terrain drop compensation (TDC technique to solve the problem of the concavity of railway crossings; (2 we use a linear regression technique to predict the position and length of an object from image processing; (3 we have developed a novel strategy called calculating local maximum Y-coordinate object points (CLMYOP to obtain the ground points of the object. In addition, image preprocessing is also applied to filter out the noise and successfully improve the object detection. From the experimental results, it is demonstrated that our scheme is an effective and corrective method for the detection of railway crossing risk areas.

  3. FY 2005 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — The Supplement to the President`s FY 2005 Budget reports on the FY 2004 research and development R and D activities and FY 2005 plans of the multiagency Networking...

  4. 75 FR 15686 - NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015

    Science.gov (United States)

    2010-03-30

    ...-01] NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015 AGENCY... and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of availability and request for public comment. [[Page 15687

  5. FY 1996 Congressional budget request: Budget highlights

    Energy Technology Data Exchange (ETDEWEB)

    1995-02-01

    The FY 1996 budget presentation is organized by the Department`s major business lines. An accompanying chart displays the request for new budget authority. The report compares the budget request for FY 1996 with the appropriated FY 1995 funding levels displayed on a comparable basis. The FY 1996 budget represents the first year of a five year plan in which the Department will reduce its spending by $15.8 billion in budget authority and by $14.1 billion in outlays. FY 1996 is a transition year as the Department embarks on its multiyear effort to do more with less. The Budget Highlights are presented by business line; however, the fifth business line, Economic Productivity, which is described in the Policy Overview section, cuts across multiple organizational missions, funding levels and activities and is therefore included in the discussion of the other four business lines.

  6. FY2000 Annual Self-Evaluation Report for the Pacific Northwest National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    RR Labarge

    2000-11-15

    This self-evaluation report offers a summary of results from FY2000 actions to achieve Pacific Northwest National Laboratory's strategy and provides an analysis of the state of their self-assessment process. The result of their integrated planning and assessment process identifies Laboratory strengths and opportunities for improvement. Critical elements of that process are included in this report; namely, a high-level summary of external oversight activities, progress against Operations Improvement Initiatives, and a summary of Laboratory strengths and areas for improvement developed by management from across the laboratory. Some key areas targeted for improvement in FY2001 are: systems approach to resource management; information protection; integrated safety management flow-down to the benchtop; cost management; integrated assessment; Price Anderson Amendments Act (PAAA) Program; and travel risk mitigation.

  7. Institutional Plan, FY 1993--1998, Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1993-01-01

    This document presents the plans and goals of the Idaho National Engineering Laboratory for FY 1993--1998. Areas discussed in this document include: INEL strategic view; initiatives; scientific and technical programs; environmental, safety, and health management, technology transfer, science and math education, and community affairs; human resources; site and facilities; and resource projections

  8. FY2013 Vehicle and Systems Simulation and Testing R&D Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-02-01

    FY 2013 annual report focuses on the following areas: vehicle modeling and simulation, component and systems evaluations, laboratory and field evaluations, codes and standards, industry projects, and vehicle systems optimization.

  9. Operating and impact of the compensation mechanism of the electric utility charges on the energy offer in non connected areas

    International Nuclear Information System (INIS)

    Levratto, N.

    2005-01-01

    Since the law of the 10 february 2000 relative to the modernization and the development of the electric utility, the France adopted a mechanism aiming to compensate the costs subjected by EDF and other suppliers providing a public utility mission in the domain of the electricity production and distribution. This document takes stock on the organization, the evaluation and the economical and environmental consequences of the implementing of a compensation system of costs bond to the electricity production in non connected areas. (A.L.B.)

  10. FY 1997 cost savings report

    International Nuclear Information System (INIS)

    Sellards, J.B.

    1998-01-01

    With the end of the cold war, funding for the Environmental Management program increased rapidly as nuclear weapons production facilities were shut down, cleanup responsibilities increased, and facilities were transferred to the cleanup program. As funding for the Environmental Management (EM) program began to level off in response to Administration and Congressional efforts to balance the Federal budget, the program redoubled its efforts to increase efficiency and get more productivity out of every dollar. Cost savings and enhanced performance are an integral pair of Hanford Site operations. FY1997 was the third year of a cost savings program that was initially defined in FY 1995. The definitions and process remained virtually the same as those used in FY 1996

  11. Integral Fast Reactor Program annual progress report, FY 1994

    International Nuclear Information System (INIS)

    Chang, Y.I.; Walters, L.C.; Laidler, J.J.; Pedersen, D.R.; Wade, D.C.; Lineberry, J.J.

    1994-12-01

    This report summarizes highlights of the technical progress made in the Integral Fast Reactor (IFR) Program in FY 1994. Technical accomplishments are presented in the following areas of the IFR technology development activities: metal fuel performance; pyroprocess development; safety experiments and analyses; core design development; fuel cycle demonstration; and LMR technology R ampersand D

  12. Energy statistics for multi-dwelling buildings in 2008; Energistatistik foer flerbostadshus 2008

    Energy Technology Data Exchange (ETDEWEB)

    2009-09-15

    82 percent of the total heated area in multi-dwelling buildings in 2008 was heated by district heating. District heating was also used in combination with other types of heating to heat another 3 percent of the area. The percentage of area that is only heated by oil is approximately 1 percent, a slight decrease compared to 2007. Oil is also used in combination with other types of heating for approximately 1 percent of the area. The use of heating oil has decreased from 75 000 m3 in 2007 to 51 000 m3 in 2008. Natural gas and gasworks' gas consumption has decreased compared to 2007. The total water consumption was 278 millions m3. The average use was 1 698 litres per m2. Average usage of energy in 2008: 17.7 litres or (176.1 kWh) of oil per for multi-dwelling buildings in 2008, 148 kWh district heating per m2, 123 kWh electricity per m2 Total usage of energy in 2008 25.7 TWh was the total consumption of energy for heating and hot water in multi dwelling buildings in 2008

  13. 2012 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    Energy Technology Data Exchange (ETDEWEB)

    Shott, G. [National Security Technologies, LLC

    2013-03-18

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since

  14. Electronics Engineering Research. Final report, FY 1979

    International Nuclear Information System (INIS)

    Weissenberger, S.

    1980-01-01

    Accomplishments in Electronics Engineering Research (EER) during FY79 spanned a broad range of technologies, from high-speed microelectronics to digital image enhancement; from underground probing with electromagnetic waves to detecting neutrons with a small solid-state device; and from computer systems to aid engineers, to software tools to aid programmers. This report describes the overall EER program and its objectives, summarizes progress made in FY79, and outlines plans for FY80

  15. Integral Fast Reactor Program. Annual progress report, FY 1992

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Y.I.; Walters, L.C.; Laidler, J.J.; Pedersen, D.R.; Wade, D.C.; Lineberry, M.J.

    1993-06-01

    This report summarizes highlights of the technical progress made in the Integral Fast Reactor (IFR) Program in FY 1992. Technical accomplishments are presented in the following areas of the IFR technology development activities: (1) metal fuel performance, (2) pyroprocess development, (3) safety experiments and analyses, (4) core design development, (5) fuel cycle demonstration, and (6) LMR technology R&D.

  16. National Nanotechnology Initiative Investments by Agency and Program Component Area

    Data.gov (United States)

    Office of Science and Technology Policy, Executive Office of the President — Data represents National Nanotechnology Initiative investments by agency and program component area (PCA) from FY 2001 through FY 2010 (requested). While this data...

  17. FY12 St Johns River Water Management LiDAR Survey: Putnam (FL)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Light Detection and Ranging (LiDAR) dataset is a survey of the FY12 St Johns River Water Management LiDAR Survey, project area in north-central Florida and...

  18. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs. FY 2005 - FY 2050

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2004-05-01

    This report describes a benefits analysis undertaken by EERE to better understand the extent to which the technologies and market improvements funded by its FY 2005 budget request will make energy more affordable, cleaner, and more reliable. It summarizes the results of the analysis, which focused on economic, environmental, and security benefits related to energy. The report identifies specific measures or indicators of estimated benefits for FY 2005.

  19. Results of single borehole hydraulic tests in the Mizunami Underground Research Laboratory project. FY 2012 - FY 2015

    International Nuclear Information System (INIS)

    Onoe, Hironori; Takeuchi, Ryuji

    2016-11-01

    This report summarize the results of the single borehole hydraulic tests of 151 sections carried out at the -300 m Stage and the -500 m Stage of the Mizunami Underground Research Laboratory from FY 2012 to FY 2015. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical methods used are presented in this report. Furthermore, the previous results of the single borehole hydraulic tests carried out in the Regional Hydrogeological Study Project and the Mizunami Underground Research Laboratory Project before FY 2012 are also summarized in this report. (author)

  20. NASA Occupational Health Program FY98 Self-Assessment

    Science.gov (United States)

    Brisbin, Steven G.

    1999-01-01

    The NASA Functional Management Review process requires that each NASA Center conduct self-assessments of each functional area. Self-Assessments were completed in June 1998 and results were presented during this conference session. During FY 97 NASA Occupational Health Assessment Team activities, a decision was made to refine the NASA Self-Assessment Process. NASA Centers were involved in the ISO registration process at that time and wanted to use the management systems approach to evaluate their occupational health programs. This approach appeared to be more consistent with NASA's management philosophy and would likely confer status needed by Senior Agency Management for the program. During FY 98 the Agency Occupational Health Program Office developed a revised self-assessment methodology based on the Occupational Health and Safety Management System developed by the American Industrial Hygiene Association. This process was distributed to NASA Centers in March 1998 and completed in June 1998. The Center Self Assessment data will provide an essential baseline on the status of OHP management processes at NASA Centers. That baseline will be presented to Enterprise Associate Administrators and DASHO on September 22, 1998 and used as a basis for discussion during FY 99 visits to NASA Centers. The process surfaced several key management system elements warranting further support from the Lead Center. Input and feedback from NASA Centers will be essential to defining and refining future self assessment efforts.

  1. NREL Energy Storage Projects: FY2013 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, A.; Ban, C.; Brooker, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Long, D.; Neubauer, J.; Santhanagopalan, S.; Smith, K.; Tenent, R.; Wood, E.; Han, T.; Hartridge, S.; Shaffer, C. E.

    2014-07-01

    In FY13, DOE funded NREL to make technical contributions to various R&D activities. This report summarizes NREL's R&D projects in FY13 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY13 projects under NREL's Energy Storage R&D program are discussed in depth in this report.

  2. FY-95 technology catalog. Technology development for buried waste remediation

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) Buried Waste Integrated Demonstration (BWID) program, which is now part of the Landfill Stabilization Focus Area (LSFA), supports applied research, development, demonstration, and evaluation of a multitude of advanced technologies dealing with underground radioactive and hazardous waste remediation. These innovative technologies are being developed as part of integrated comprehensive remediation systems for the effective and efficient remediation of buried waste sites throughout the DOE complex. These efforts are identified and coordinated in support of Environmental Restoration (EM-40) and Waste Management (EM-30) needs and objectives. Sponsored by the DOE Office of Technology Development (EM-50), BWID and LSFA work with universities and private industry to develop technologies that are being transferred to the private sector for use nationally and internationally. This report contains the details of the purpose, logic, and methodology used to develop and demonstrate DOE buried waste remediation technologies. It also provides a catalog of technologies and capabilities with development status for potential users. Past FY-92 through FY-94 technology testing, field trials, and demonstrations are summarized. Continuing and new FY-95 technology demonstrations also are described

  3. FY-95 technology catalog. Technology development for buried waste remediation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The US Department of Energy`s (DOE) Buried Waste Integrated Demonstration (BWID) program, which is now part of the Landfill Stabilization Focus Area (LSFA), supports applied research, development, demonstration, and evaluation of a multitude of advanced technologies dealing with underground radioactive and hazardous waste remediation. These innovative technologies are being developed as part of integrated comprehensive remediation systems for the effective and efficient remediation of buried waste sites throughout the DOE complex. These efforts are identified and coordinated in support of Environmental Restoration (EM-40) and Waste Management (EM-30) needs and objectives. Sponsored by the DOE Office of Technology Development (EM-50), BWID and LSFA work with universities and private industry to develop technologies that are being transferred to the private sector for use nationally and internationally. This report contains the details of the purpose, logic, and methodology used to develop and demonstrate DOE buried waste remediation technologies. It also provides a catalog of technologies and capabilities with development status for potential users. Past FY-92 through FY-94 technology testing, field trials, and demonstrations are summarized. Continuing and new FY-95 technology demonstrations also are described.

  4. FY2007 Laboratory Directed Research and Development Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Craig, W W; Sketchley, J A; Kotta, P R

    2008-03-20

    The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2007 (FY07) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: An introduction to the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY07, and a list of publications that resulted from the research in FY07. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year.

  5. W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2004-09-30

    This report summarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting

  6. W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status

    International Nuclear Information System (INIS)

    Durham, Robin E.; Sackschewsky, Michael R.

    2004-01-01

    This report/SUMmarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting

  7. Summary of NREL's FY13-FY15 Photovoltaic Subprogram

    Energy Technology Data Exchange (ETDEWEB)

    2017-03-31

    In this report, you will find summaries of the completed FY13-FY15 Photovoltaic projects that were funded within NREL. The summaries describe the initial motivation for the project; significant achievements, including publications, intellectual property, and collaborations; and remaining challenges. Among the NREL projects, you will find research of almost every major PV technology - from the next generation of silicon PV to relatively new organic PVs - as well as projects advancing PV module durability and characterization. Each of these projects was designed to support SunShot's goals, putting the United States one step closer to widespread use of low-cost, clean electricity.

  8. Integral Fast Reactor Program annual progress report, FY 1991

    International Nuclear Information System (INIS)

    1992-06-01

    This report summarizes highlights of the technical progress made in the Integral Fast Reactor (IFR) Program in FY 1991. Technical accomplishments are presented in the following areas of the IFR technology development activities: (1) metal fuel performance, (2) pyroprocess development, (3) safety experiments and analyses, (4) core design development, (5) fuel cycle demonstration, and (6) LMR technology R ampersand D

  9. Integral Fast Reactor Program. Annual progress report, FY 1993

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Y.I.; Walters, L.C.; Laidler, J.J.; Pedersen, D.R.; Wade, D.C.; Lineberry, M.J.

    1994-10-01

    This report summarizes highlights of the technical progress made in the Integral Fast Reactor (IFR) Program in FY 1993. Technical accomplishments are presented in the following areas of the IFR technology development activities: (1) metal fuel performance, (2) pyroprocess development, (3) safety experiments and analyses, (4) core design development, (5) fuel cycle demonstration, and (6) LMR technology R and D.

  10. Integral Fast Reactor Program. Annual progress report, FY 1993

    International Nuclear Information System (INIS)

    Chang, Y.I.; Walters, L.C.; Laidler, J.J.; Pedersen, D.R.; Wade, D.C.; Lineberry, M.J.

    1994-10-01

    This report summarizes highlights of the technical progress made in the Integral Fast Reactor (IFR) Program in FY 1993. Technical accomplishments are presented in the following areas of the IFR technology development activities: (1) metal fuel performance, (2) pyroprocess development, (3) safety experiments and analyses, (4) core design development, (5) fuel cycle demonstration, and (6) LMR technology R and D

  11. EST Table: FY036659 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available FY036659 rbmte13c09 11/12/09 GO hit GO:0047800(cysteamine dioxygenase activity)|GO:...f|XP_974899.1| PREDICTED: similar to 2-aminoethanethiol (cysteamine) dioxygenase [Tribolium castaneum] FY036659 bmte ...

  12. Sustainable NREL - Site Sustainability Plan FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-01-01

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  13. US EPA Nonattainment Areas and Designations-Lead (2008 NAAQS)

    Data.gov (United States)

    U.S. Environmental Protection Agency — This web service contains the following layers: Lead NAA 2008 NAAQS and Lead NAA Centroids 2008 NAAQS. Full FGDC metadata records for each layer may be found by...

  14. Environmental management compliance reengineering project, FY 1997 report

    International Nuclear Information System (INIS)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL''s environment, safety, and health requirements and milestone commitments. Compliance reengineer''s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL

  15. Environmental management compliance reengineering project, FY 1997 report

    Energy Technology Data Exchange (ETDEWEB)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  16. 2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada; Review of the Performance Assessments and Composite Analyses

    Energy Technology Data Exchange (ETDEWEB)

    Shott, Gregory [NSTec

    2014-03-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations

  17. Tokamak power systems studies, FY 1985

    International Nuclear Information System (INIS)

    Baker, C.C.; Brooks, J.N.; Ehst, D.A.; Smith, D.L.; Sze, D.K.

    1985-12-01

    The Tokamak Power System Studies (TPSS) at ANL in FY-1985 were devoted to exploring innovative design concepts which have the potential for making substantial improvements in the tokamak as a commercial power reactor. Major objectives of this work included improved reactor economics, improved environmental and safety features, and the exploration of a wide range of reactor plant outputs with emphasis on reduced plant sizes compared to STARFIRE. The activities concentrated on three areas: plasma engineering, impurity control, and blanket/first wall/shield technology. 205 refs., 125 figs., 107 tabs

  18. Tokamak power systems studies, FY 1985

    Energy Technology Data Exchange (ETDEWEB)

    Baker, C.C.; Brooks, J.N.; Ehst, D.A.; Smith, D.L.; Sze, D.K.

    1985-12-01

    The Tokamak Power System Studies (TPSS) at ANL in FY-1985 were devoted to exploring innovative design concepts which have the potential for making substantial improvements in the tokamak as a commercial power reactor. Major objectives of this work included improved reactor economics, improved environmental and safety features, and the exploration of a wide range of reactor plant outputs with emphasis on reduced plant sizes compared to STARFIRE. The activities concentrated on three areas: plasma engineering, impurity control, and blanket/first wall/shield technology. 205 refs., 125 figs., 107 tabs.

  19. Laboratory Directed Research and Development Program Activities for FY 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Looney,J.P.; Fox, K.

    2009-04-01

    Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory that maintains a primary mission focus the physical sciences, energy sciences, and life sciences, with additional expertise in environmental sciences, energy technologies, and national security. It is managed by Brookhaven Science Associates, LLC, (BSA) under contract with the U. S. Department of Energy (DOE). BNL's Fiscal year 2008 budget was $531.6 million. There are about 2,800 employees, and another 4,300 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) annually in March, as required by DOE Order 413.2B, 'Laboratory Directed Research and Development,' April 19, 2006, and the Roles, Responsibilities, and Guidelines for Laboratory Directed Research and Developlnent at the Department of Energy/National Nuclear Security Administration Laboratories dated June 13, 2006. Accordingly, this is our Annual Report in which we describe the Purpose, Approach, Technical Progress and Results, and Specific Accomplishments of all LDRD projects that received funding during Fiscal Year 2008. BNL expended $12 million during Fiscal Year 2008 in support of 69 projects. The program has two categories, the annual Open Call LDRDs and Strategic LDRDs, which combine to meet the overall objectives of the LDRD Program. Proposals are solicited annually for review and approval concurrent with the next fiscal year, October 1. For the open call for proposals, an LDRD Selection Committee, comprised of the Associate Laboratory Directors (ALDs) for the Scientific Directorates, an equal number of scientists recommended by the Brookhaven Council, plus the Assistant Laboratory Director for Policy and Strategic Planning, review the proposals submitted in response to the solicitation. The Open Can LDRD category emphasizes innovative research concepts

  20. The Lightning Mapping Imager (LMI) on the FY-4 satellite and a typical application experiment using the LMI data

    Science.gov (United States)

    Huang, F.; Hui, W.; Li, X.; Liu, R.; Zhang, Z.; Zheng, Y.; Kang, N.

    2017-12-01

    The Lightning Mapping Imager (LMI) on the FY-4A satellite, which was launched successfully in December 2016, is the first satellite-based lightning detector from space independently developed in China, and one of the world's first two stationary satellite LMIs. The optical imaging technique with a 400x600 CCD array plane and a frequency of 500 frames/s is adopted in the FY-4A LMI to perform real-time and continuous observation of total lightening in the Chinese mainland and adjacent areas. As of July 2017, the in-orbit test shows that the lightening observation date could be accurately obtained by the FY-4A LMI, and that the geo-location could be verified by the ground lightening observation network over China. Since the beginning of the 2017 flood season, every process of strong thunderstorms has been monitored by the FY-4A LMI throughout the various areas of China, and of these are used as a typical application case in this talk. On April 8 and 9, 2017, a strong convective precipitation process occurred in the middle-lower reaches of the Yangtze River, China. The observation data of the FY-4A LMI are used to monitor the occurrence, development, shift and extinction of the thunderstorm track. By means of analyzing the station's synchronous precipitation observation data, it is indicated that the moving track of the thunderstorm is not completely consistent with that of the precipitation center, and while the distribution areas of thunderstorm and precipitation are consistent to a certain extent, a significant difference also exists. This difference is mainly caused by the convective precipitation and stratus precipitation area during the precipitation process. Through comparative analysis, the preliminary satellite and foundation lightening observation data show a higher consistency. However, the time of lightening activity observed by satellite is one hour earlier than that of the ground observation, which is likely related to the total lightning observation by

  1. Federal Research and Development Funding: FY2014

    Science.gov (United States)

    2014-02-19

    1.12 billion for FY2014. The FY2014 request proposed $155 million to replace the agency’s Southeast Poultry Disease Research Laboratory in Athens...formula funding, and special grants. 94 U.S. Department of Agriculture, “Statement by Thomas J

  2. Accelerator/Experiment operations - FY 2006

    Energy Technology Data Exchange (ETDEWEB)

    Brice, S.; Conrad, J.; Denisov, D.; Ginther, G.; Holmes, S.; James, C.; Lee, W.; Louis, W.; Moore, C.; Plunkett, R.; Raja, R.; /Fermilab

    2006-10-01

    This Technical Memorandum (TM) summarizes the Fermilab accelerator and experiment operations for FY 2006. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2006 Run II at the Tevatron Collider, the MiniBooNE experiments running in the Booster Neutrino Beam in neutrino and antineutrino modes, MINOS using the Main Injector Neutrino Beam (NuMI), and SY 120 activities.

  3. Safety and protection for large-scale superconducting magnets. FY'82 report

    International Nuclear Information System (INIS)

    Thome, R.J.; Pillsbury, R.D. Jr.; Iwasa, Y.; Mann, W.R.; Langton, W.G.

    1982-10-01

    The FY82 effort in safety and protection focused on tests and analyses in the following areas: (a) short circuit performance in the 30 T hybrid magnet, (b) arc voltage/current characteristics in simulated windings, (c) vapor-cooled lead burnout, (d) acoustic emission, and (e) joint MESA/MIT safety activity

  4. Office of Technology Development FY 1993 program summary: Office of Research and Development, Office of Demonstration, Testing and Evaluation. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT&E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT&E programs are discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT&E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section.

  5. Office of Technology Development FY 1993 program summary: Office of Research and Development, Office of Demonstration, Testing and Evaluation. Revision 1

    International Nuclear Information System (INIS)

    1994-02-01

    This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT ampersand E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT ampersand E programs are discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT ampersand E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section

  6. Laboratory directed research and development FY98 annual report; TOPICAL

    International Nuclear Information System (INIS)

    Al-Ayat, R; Holzrichter, J

    1999-01-01

    In 1984, Congress and the Department of Energy (DOE) established the Laboratory Directed Research and Development (LDRD) Program to enable the director of a national laboratory to foster and expedite innovative research and development (R and D) in mission areas. The Lawrence Livermore National Laboratory (LLNL) continually examines these mission areas through strategic planning and shapes the LDRD Program to meet its long-term vision. The goal of the LDRD Program is to spur development of new scientific and technical capabilities that enable LLNL to respond to the challenges within its evolving mission areas. In addition, the LDRD Program provides LLNL with the flexibility to nurture and enrich essential scientific and technical competencies and enables the Laboratory to attract the most qualified scientists and engineers. The FY98 LDRD portfolio described in this annual report has been carefully structured to continue the tradition of vigorously supporting DOE and LLNL strategic vision and evolving mission areas. The projects selected for LDRD funding undergo stringent review and selection processes, which emphasize strategic relevance and require technical peer reviews of proposals by external and internal experts. These FY98 projects emphasize the Laboratory's national security needs: stewardship of the U.S. nuclear weapons stockpile, responsibility for the counter- and nonproliferation of weapons of mass destruction, development of high-performance computing, and support of DOE environmental research and waste management programs

  7. SOLID WASTE INTEGRATED FORECAST TECHNICAL (SWIFT) REPORT FY2003 THRU FY2046 VERSION 2003.1 VOLUME 2 [SEC 1 & 2

    Energy Technology Data Exchange (ETDEWEB)

    BARCOT, R.A.

    2003-12-01

    This report includes data requested on September 10, 2002 and includes radioactive solid waste forecasting updates through December 31, 2002. The FY2003.0 request is the primary forecast for fiscal year FY 2003.

  8. 2008 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-03-01

    This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Subsurface Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of the CNTA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof-of-concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 443 that were conducted at the site during fiscal year 2008. This is the second groundwater monitoring report prepared by DOE-LM for the CNTA.

  9. 2008 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443

    International Nuclear Information System (INIS)

    2009-01-01

    This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Subsurface Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of the CNTA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof-of-concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 443 that were conducted at the site during fiscal year 2008. This is the second groundwater monitoring report prepared by DOE-LM for the CNTA

  10. Task Force Report, Safety of Personnel in LHC underground areas following the accident of 19th September 2008

    CERN Document Server

    Delille, B; Inigo-Golfin, J; Lindell, G; Roy, G; Tavian, L; Thomas, E; Trant, R; Völlinger, C

    2009-01-01

    In January 2009, the Task Force on Safety of Personnel in the LHC underground areas following the accident in sector 3-4 of 19th September 2008 (Safety Task Force) received from the CERN Director General the mandate to investigate the impact of the accident of 19th September 2008 on the safety of personnel working in the LHC underground areas. This mandate includes the elaboration of preventive and/or corrective measures, if deemed necessary. This report gives the conclusions and recommendations of the Safety Task Force which have been reviewed by an external advisory committee of safety experts.

  11. Technical Issues Map for the NHI System Interface and Support Systems Area: 2nd Quarter FY07

    International Nuclear Information System (INIS)

    Steven R. Sherman

    2007-01-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway in the 2nd quarter of FY07

  12. Annual Progress Report FY-82. Volume I.

    Science.gov (United States)

    1982-01-01

    Comparison of Binaural Versus 316 Monaural Amplification. (FY-81PI) 2535 Development of Method for Generating 318 Individualized Aural Rehabilitation...Oncology Group. 428 (FY-74 I ) 4116 The Evaluation of Petal Systolic Time Intervals 429 and Beat interval Variation in Fetal heart Rate as Early

  13. DOE Hazardous Waste Remedial Actions Program: Annual report, FY 1986

    International Nuclear Information System (INIS)

    Eyman, L.D.

    1987-05-01

    The activities of HAZWRAP for the past fiscal year were organized into seven principal areas: technical analysis and technology transfer; regulatory analysis; strategic planning;information systems; program administration; technology adaptation; and technology demonstration. The scope, major FY 1986 accomplishments, and future directions for each of these areas are described in the following sections of this report. Listings of reports produced through the SCO are given in Appendixes A and B for the current year and since the program started, respectively

  14. FY1983 HTGR summary level program plan

    International Nuclear Information System (INIS)

    1983-01-01

    The major focus and priority of the FY1983 HTGR Program is the development of the HTGR-SC/C Lead Project through one of the candidate lead utilities. Accordingly, high priority will be given to work described in WBS 04 for site and user specific studies toward the development of the Lead Project. Asessment of advanced HTGR systems will continue during FY1983 in accordance with the High Temperature Process Heat (HTPH) Concept Evaluation Plan. Within the context of that plan, the assessment of the monolithic HTPH concepts has been essentially completed in FY1982 and FY1983 activities and will be limited to documentation only. the major advanced HTGR systems efforts in FY1983 will be focused on the further definition of the Modular Reactor Systems concepts in both the reforming (MRS-R) and Steam Cycle/Cogeneration 9MRS-SC/C) configurations in WBS 41. The effort will concentrate upon key technical issues and trade studies oriented to reduction in expected cost and schedule duration. With regard to the latter, the most significant will be trade study addressing the degree of modularization of reactor plant structures. particular attention will be given to the confinement building which currently defines the critical path for construction

  15. Technical Issues Map for the NHI System Interface and Support Systems Area: 3rd Quarter FY 07

    International Nuclear Information System (INIS)

    Steven R. Sherman

    2007-01-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway. The technical issues are ranked according to priority and by assumed resolution dates. Due to funding limitations, not all high-priority technical issues are under study at the present time, and more resources will need to be dedicated to tackling such issues in the future. This technical issues map is useful for understanding the relative importance of various technical challenges and will be used as a planning tool by the NHI technical leadership for future work package planning. The technical map in its present form will be discontinued in FY08 and will be folded into a larger NHI System Interface and Support Systems project management plan and scope baseline statement in FY08

  16. Nevada nuclear waste storage investigations: FY 1980 Project Plan and FY 1981 forecast

    International Nuclear Information System (INIS)

    1980-02-01

    The DOE is responsible for developing or improving the technology for safely and permanently isolating radioactive wastes from the biosphere. The National Waste Terminal Storage Program, which is a part of the US Nuclear Waste Management Program, is concerned with disposing of the high-level wastes associated with DOE and commercial nuclear reactor fuel cycles. The DOE/NV has been delegated the responsibility to evaluate the geohydrologic setting and underground rock masses of the Nevada Test Site (NTS) area to determine whether a suitable site exists for constructing a repository for isolating highly radioactive solid wastes. Accordingly, the Nevada Nuclear Waste Storage Investigations (NNWSI) were established by NV to conduct these evaluations. The NNWSI are managed by the DOE/NV, but the field and laboratory investigations are being performed by scientific investigators from several organizations. The four primary organizations involved are: Los Alamos Scientific Laboratory (LASL), Lawrence Livermore Laboratory (LLL), Sandia Laboratories (SL), and the US Geological Survey (USGS). DOE/NV is responsible for coordinating these investigations. This document presents the Project Plan for the NNWSI for FY 1980 and forecasts activities for FY 1981. Each task is divided into subtasks and described. This Plan is subject ot periodic review and revision by the DOE/NV. Changes will be addressed as they occur in NNWSI Quarterly Reports. This document also presents information on the Project's technical approach as well as its history, organization, and management

  17. Laboratory Directed Research and Development Program Assessment for FY 2008

    Energy Technology Data Exchange (ETDEWEB)

    Looney, J P; Fox, K J

    2008-03-31

    Brookhaven National Laboratory (BNL) is a multidisciplinary Laboratory that carries out basic and applied research in the physical, biomedical, and environmental sciences, and in selected energy technologies. It is managed by Brookhaven Science Associates, LLC, (BSA) under contract with the U. S. Department of Energy (DOE). BNL's Fiscal Year 2008 spending was $531.6 million. There are approximately 2,800 employees, and another 4,300 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) annually in March, as required by DOE Order 413.2B, 'Laboratory Directed Research and Development,' April 19, 2006, and the Roles, Responsibilities, and Guidelines for Laboratory Directed Research and Development at the Department of Energy/National Nuclear Security Administration Laboratories dated June 13, 2006. The goals and objectives of BNL's LDRD Program can be inferred from the Program's stated purposes. These are to (1) encourage and support the development of new ideas and technology, (2) promote the early exploration and exploitation of creative and innovative concepts, and (3) develop new 'fundable' R&D projects and programs. The emphasis is clearly articulated by BNL to be on supporting exploratory research 'which could lead to new programs, projects, and directions' for the Laboratory. To be a premier scientific Laboratory, BNL must continuously foster groundbreaking scientific research and renew its research agenda. The competition for LDRD funds stimulates Laboratory scientists to think in new and creative ways, which becomes a major factor in achieving and maintaining research excellence and a means to address National needs within the overall mission of the DOE and BNL. By fostering high-risk, exploratory research, the LDRD program helps

  18. Quality of surface-water supplies in the Triangle area of North Carolina, water year 2008

    Science.gov (United States)

    Giorgino, M.J.; Rasmussen, R.B.; Pfeifle, C.A.

    2012-01-01

    Surface-water supplies are important sources of drinking water for residents in the Triangle area of North Carolina, which is located within the upper Cape Fear and Neuse River Basins. Since 1988, the U.S. Geological Survey and a consortium of governments have tracked water-quality conditions and trends in several of the area's water-supply lakes and streams. This report summarizes data collected through this cooperative effort, known as the Triangle Area Water Supply Monitoring Project, during October 2007 through September 2008. Major findings for this period include:

  19. Efficacy of patient skin dose reduction by a compensating filter through of irradiation field overlaps on the area during percutaneous coronary intervention

    International Nuclear Information System (INIS)

    Yamasaki, Hiroyuki; Yamaguchi, Sadao; Yamamoto, Naomi; Miyagawa, Takashi; Hirose, Etsuko; Takenaka, Tatsuaki; Nakahara, Makoto

    2011-01-01

    Our study was involved with entrance surface dose reduction and irradiation field by the filter use of PCI, and insertion in place of an effective compensating filter to maximize entrance surface dose reduction, which we verified. The radiation dosimetry put a 6 cc ion chamber on the back side of the thorax phantom, and changed the filter of the four corners (a: upper left, b: upper right, c: lower right, d: lower left) of the monitor confirmed with fluoroscopy [(0) no filter, (1) one filter, (2) two filters]. The angle of C arm was assumed to be eight directions and 0 degrees adopted by this hospital. It was compared with a corrective rate of which one was no filter. Next, the presence of filter and irradiation field overlaps on the area in monitor in the angle of C arm was verified by this hospital's classic example. As for corrective rate, (1) becomes 0.41 and (2) become 0.25 at fluoroscopy, (1) becomes 0.26 and (2) become 0.16 at exposure. Irradiation field overlaps on the area (+) compensating filter (-) was many with d of right anterior oblique (RAO)/cranial (CAU), a of RAO and c of CAU at left coronary angiography (CAG), c of left anterior oblique (LAO) at right CAG, b of LAO/cranial (CRA) (left CAG), b of CRA (right CAG) and a and d of RAO (right CAG) at both CAG. Irradiation field overlaps on the area (+) compensating filter (+) was many with b of CRA at left CAG, a of LAO/CRA at right CAG, b of CRA (left CAG) and b of RAO (right CAG) at both CAG. When the compensating filter is used the entrance surface dose reduction effect was great. If automatic exposure control protects the part of irradiation field overlaps on the area in the range without operating excessively, the radiological risk can be reduced, and it is conceivable as useful clinical setting. (author)

  20. 2011 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    International Nuclear Information System (INIS)

    2012-01-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC, 2007a) requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs), with the results submitted annually to U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE, 1999a; 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2011. This annual summary report presents data and conclusions from the FY 2011 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R and D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) (formerly the Nevada Test Site) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R and D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2011 include the following: (1) Operation of a new shallow land disposal unit and a new Resource Conservation and Recovery Act (RCRA)-compliant lined disposal unit at the Area 5 RWMS; (2) Development of new closure inventory estimates based on disposals through FY 2011; (3) Evaluation of new or revised waste streams by special analysis; (4) Development of

  1. 2011 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2012-03-20

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC, 2007a) requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs), with the results submitted annually to U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE, 1999a; 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2011. This annual summary report presents data and conclusions from the FY 2011 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R and D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) (formerly the Nevada Test Site) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R and D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2011 include the following: (1) Operation of a new shallow land disposal unit and a new Resource Conservation and Recovery Act (RCRA)-compliant lined disposal unit at the Area 5 RWMS; (2) Development of new closure inventory estimates based on disposals through FY 2011; (3) Evaluation of new or revised waste streams by special analysis; (4) Development of

  2. Sales compensation governance: the last frontier of corporate reform.

    Science.gov (United States)

    Gundy, Peter R; Gaeta, Elizabeth C

    2004-01-01

    The area of sales compensation has remained relatively untouched by recent pressures for compensation reform. This article highlights some of the ways that sales organizations stumble in managing their compensation programs, and why it takes more than a simple tactical fix to address these problems effectively. The authors describe a more structured governance framework that not only identifies and resolves key sales compensation issues, but ultimately safeguards the effectiveness and financial integrity of the sales organization itself.

  3. Summary of FY 17 Assessments Sandia National Laboratories: Evaluation of FY16 SNL FCT M2 Milestone Deliverables

    Energy Technology Data Exchange (ETDEWEB)

    Appel, Gordon John

    2017-03-01

    This report is the milestone deliverable M4FT-17SN111102091 “Summary of Assessments Performed FY17 by SNL QA POC” for work package FT-17SN11110209 titled “Quality Assurance – SNL”. This report summarizes the FY17 assessment performed on Fuel Cycle Technologies / Spent Fuel and Waste Disposition efforts.

  4. A Year of Exceptional Achievements FY 2008

    International Nuclear Information System (INIS)

    Devore, L.; Chrzanowski, P.

    2008-01-01

    2008 highlights: (1) Stockpile Stewardship and Complex Transformation - LLNL achieved scientific breakthroughs that explain some of the key 'unknowns' in nuclear weapons performance and are critical to developing the predictive science needed to ensure the safety, reliability, and security of the U.S. nuclear deterrent without nuclear testing. In addition, the National Ignition Facility (NIF) passed 99 percent completion, an LLNL supercomputer simulation won the 2007 Gordon Bell Prize, and a significant fraction of our inventory of special nuclear material was shipped to other sites in support of complex transformation. (2) National and Global Security - Laboratory researchers delivered insights, technologies, and operational capabilities that are helping to ensure national security and global stability. Of particular note, they developed advanced detection instruments that provide increased speed, accuracy, specificity, and resolution for identifying and characterizing biological, chemical, nuclear, and high-explosive threats. (3) Exceptional Science and Technology - The Laboratory continued its tradition of scientific excellence and technical innovation. LLNL scientists made significant contributions to Nobel Prize-winning work on climate change. LLNL also received three R and D 100 awards and six Nanotech 50 awards, and dozens of Laboratory scientists and engineers were recognized with professional awards. These honors provide valuable confirmation that peers and outside experts recognize the quality of our staff and our work. (4) Enhanced Business and Operations - A major thrust under LLNS is to make the Laboratory more efficient and cost competitive. We achieved roughly $75 million in cost savings for support activities through organizational changes, consolidation of services, improved governance structures and work processes, technology upgrades, and systems shared with Los Alamos National Laboratory. We realized nonlabor cost savings of $23 million. Severe

  5. A Year of Exceptional Achievements FY 2008

    Energy Technology Data Exchange (ETDEWEB)

    devore, L; Chrzanowski, P

    2008-11-06

    2008 highlights: (1) Stockpile Stewardship and Complex Transformation - LLNL achieved scientific breakthroughs that explain some of the key 'unknowns' in nuclear weapons performance and are critical to developing the predictive science needed to ensure the safety, reliability, and security of the U.S. nuclear deterrent without nuclear testing. In addition, the National Ignition Facility (NIF) passed 99 percent completion, an LLNL supercomputer simulation won the 2007 Gordon Bell Prize, and a significant fraction of our inventory of special nuclear material was shipped to other sites in support of complex transformation. (2) National and Global Security - Laboratory researchers delivered insights, technologies, and operational capabilities that are helping to ensure national security and global stability. Of particular note, they developed advanced detection instruments that provide increased speed, accuracy, specificity, and resolution for identifying and characterizing biological, chemical, nuclear, and high-explosive threats. (3) Exceptional Science and Technology - The Laboratory continued its tradition of scientific excellence and technical innovation. LLNL scientists made significant contributions to Nobel Prize-winning work on climate change. LLNL also received three R&D 100 awards and six Nanotech 50 awards, and dozens of Laboratory scientists and engineers were recognized with professional awards. These honors provide valuable confirmation that peers and outside experts recognize the quality of our staff and our work. (4) Enhanced Business and Operations - A major thrust under LLNS is to make the Laboratory more efficient and cost competitive. We achieved roughly $75 million in cost savings for support activities through organizational changes, consolidation of services, improved governance structures and work processes, technology upgrades, and systems shared with Los Alamos National Laboratory. We realized nonlabor cost savings of $23 million

  6. Is compensation "bad for health"? A systematic meta-review.

    Science.gov (United States)

    Spearing, Natalie M; Connelly, Luke B

    2011-01-01

    There is a common perception that injury compensation has a negative impact on health status, and systematic reviews supporting this thesis have been used to influence policy and practice decisions. This study evaluates the quality of the empirical evidence of a negative correlation between injury compensation and health outcomes, based on systematic reviews involving both verifiable and non-verifiable injuries. Systematic meta-review (a "review of reviews"). PubMED, CINAHL, EMBASE, PEDro, PsycInfo, EconLit, Lexis, ABI/INFORM, The Cochrane Library, and the AHRQ EPC were searched from the date of their inception to August 2008, and hand searches were conducted. Selection criteria were established a priori. Included systematic reviews examined the impact of compensation on health, involved adults, were published in English and used a range of outcome measures. Two investigators independently applied standard instruments to evaluate the methodological quality of the included reviews. Data on compensation scheme design (i.e., the intervention) and outcome measures were also extracted. Eleven systematic reviews involving verifiable and non-verifiable injuries met the inclusion criteria. Nine reviews reported an association between compensation and poor health outcomes. All of them were affected by the generally low quality of the primary (observational) research in this field, the heterogeneous nature of compensation laws (schemes) and legal processes for seeking compensation, and the difficulties in measuring compensation in relation to health. Notwithstanding the limitations of the research in this field, one higher quality review examining a single compensation process and relying on primary studies using health outcome (rather than proxy) measures found strong evidence of no association between litigation and poor health following whiplash, challenging the general belief that legal processes have a negative impact on health status. Moves to alter scheme design and

  7. FY 1992 task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-10-01

    Phase 1 of the HEDR Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations from limited radionuclides, in a limited geographical area and time period. Phase 1 ended in FY 1990. In February 1991, the TSP decided to shift the project planning approach away from phases--which were centered around completion of major portions of technical activities--to individual fiscal years (FYs), which span October of one year through September of the next. Therefore, activities that were previously designated to occur in phases are now designated in an integrated schedule to occur in one or more of the next fiscal years into FY 1995. Task plans are updated every 6 months. In FY 1992, scientists will continue to improve Phase 1 data and models to calculate more accurate and precise dose estimates. The plan for FY 1992 has been prepared based on activities and budgets approved by the Technical Steering Panel (TSP) at its meeting on August 19--20, 1991. The activities can be divided into four categories: (1) model and data evaluation activities, (2) additional dose estimates, (3) model and data development activities, and (4) technical and communication support. 3 figs., 2 tabs

  8. Revenues and Expenditures for Public Elementary and Secondary School Districts: School Year 2008-09 (Fiscal Year 2009). First Look. NCES 2012-313

    Science.gov (United States)

    Cornman, Stephen Q.; Noel, Amber M.

    2011-01-01

    This report presents data from the School District Finance Survey (F-33) of the Common Core of Data (CCD) survey system for school year (SY) 2008-09 (fiscal year [FY] 2009). The F-33 is a district-level financial survey that consists of data submitted annually to the National Center for Education Statistics (NCES) and the Governments Division of…

  9. FY 2004 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — ...This Supplement to the Presidents Budget for Fiscal Year (FY) 2004 summarizes the NITRD agencies coordinated research activities and FY 2004 plans, as required by...

  10. FY 1997 basic survey for coal resource development. Data collection of the joint research of new technology in the geophysical exploration of coal resources (water area medium depth seam survey); 1997 nendo sekitan shigen kaihatsu kiso chosa shiryoshu. Shintansa gijutsu chosa kaihatsu (suiiki chushindoso tansa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In 'the new exploration technology test on coal resource' (water area medium depth seam exploration) jointly conducted between Japan and China, tests have been carried out for 5 years on the BDR-5 test boring measurement monitoring system and the diamond bit which are items of the technology development of high resolution seismic survey system and high efficiency test boring system. As a result, the new technology test was successful, and technical economic effects were obtained. The situation of the test was summarized. The following data were compiled as shown in Data No.1-12. 1. The proceedings of the FY 1997 Japan-China steering committee (No.9). 2. Report on the survey of China verification field South Sihu water level situation. 3. The proceedings of the FY 1997 Japan-China steering committee (final). 4. Report on the FY 1997 reflection seismic exploration survey. 5. Report on the FY 1997 No.2 test boring survey. 6. Summarization of the test on 'the new exploration technology of coal source' conducted between Japan and China. 7. Report on the drilling data measurement. 8. Various sections of the reflection seismic survey data processing. 9. Traverse line chart. 10. T3 isochrone chart. 11. T3 depth structural chart. 12. Report on the new exploration technology survey development (water area medium depth seam exploration) geological model making. (NEDO)

  11. PDX experimental results in FY82

    International Nuclear Information System (INIS)

    Kaye, S.M.; Bell, M.; Bol, K.

    1983-08-01

    This report presents a detailed summary of the major experimental results of PDX in FY82 and represents the efforts of the entire PDX group. Topics covered include β-scaling and fishbone studies, fluctuations, disruptions, impurities and impurity transport, power handling, limiter conditioning, edge studies, plasma fueling, counter-injection, and diagnostic development. A less detailed version will appear as the FY82 PDX contribution to the PPPL Annual Report

  12. Progress reports on SCWR-related development projects from Chinese universities for FY2008-2009

    International Nuclear Information System (INIS)

    Leung, L.K.H.

    2010-02-01

    Canada is participating in the international cooperative forum on system research for two designs (supercritical water-cooled reactor, SCWR, and Very High Temperature Reactor, VHTR) of the Gen-IV nuclear reactor. The forum is referred to as the Generation-IV International Forum (or GIF). The Canadian effort focuses mainly on the SCWR. Among various GIF participants, Canada is the leader of this design and has interest mainly on the pressure-tube type reactor, which is a natural extension of the existing CANDU reactor. Several critical research areas (such as material, chemistry, thermalhydraulics, instability, critical flow, etc.) have been identified in the system-research plan for supporting the SCWR design. Collaborative projects have been established between AECL and universities in China to expedite the CANDU SCWR design. These projects focus on research areas beyond the current scope of the AECL and the NSERC/NRCan/AECL collaborative research and development (CRD) project. AECL supports these projects directly and is contributing (in-kind) the results and findings to the Canadian national program. The collaboration between AECL and Chinese universities began in 2007 July. Most projects cover the duration of three years. The Chinese universities submit their annual progress reports each year prior to the project renewal. The objective of this report is to summarize the progress on collaborative projects between AECL and Chinese universities (namely the Tsinghua University, Shanghai Jiaotong University, and Xi'an Jiaotong University) over the duration of 2008 July to 2009 June. (author)

  13. FY 2014 LDRD Annual Report Project Summaries

    Energy Technology Data Exchange (ETDEWEB)

    Tomchak, Dena [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-02-01

    The FY 2014 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support future DOE missions and national research priorities. LDRD is essential to INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enahnces technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development.

  14. Review of Department of Energy HEPA filter test activities, FY 1990--FY 1992

    International Nuclear Information System (INIS)

    McIntyre, J.A.

    1992-01-01

    Filter Test Facilities (FTFs) and the FTF Technical Support Group (TSG) continue to provide services to the Department of Energy (DOE). Additional tasks relating to the HEPA filter cycle have been added to the TSG. The tasks include the quality assessment review for the in-place testing of HEPA filters at DOE sites and the formation of an in-place testing standards writing group. Summary of ongoing FTFs and TSG activities for FY 1990-FY 1992 including the technical input for implementation of the High Flow Alternative Test System (HFATS), update of the DOE Standards, the status of the quality assessment review and in-place testing standards writing group are discussed

  15. Shillapoo Wildlife Area, Annual Report 2007-2008.

    Energy Technology Data Exchange (ETDEWEB)

    Calkins, Brian

    2007-10-01

    This report summarizes accomplishments, challenges and successes on WDFW's Shillapoo Wildlife Area funded under Bonneville Power Administration's (BPA) Wildlife Mitigation Program (BPA project No.2003-012-00) during the Fiscal Year 08 contract period October 1, 2007-September 30, 2008. The information presented here is intended to supplement that contained in BPA's PISCES contract development and reporting system. The organization below is by broad categories of work but references are made to individual work elements in the PISCES Statement of Work as appropriate. Significant progress was realized in almost all major work types. Of particular note was progress made in tree plantings and pasture rehabilitation efforts. This year's tree planting effort included five sites detailed below and in terms of the number of plants was certainly the largest effort on the wildlife area to date in one season. The planting itself took a significant amount of time, which was anticipated. However, installation of mats and tubes took much longer than expected which impacted planned fence projects in particular. Survival of the plantings appears to be good. Improvement to the quality of waterfowl pasture habitats is evident on a number of sites due to replanting and weed control efforts. Continuing long-term weed control efforts will be key in improving this particular type of habitat. A prolonged cold, wet spring and a number of equipment breakdowns presented stumbling blocks that impacted schedules and ultimately progress on planned activities. The unusual spring weather delayed fieldwork on pasture planting projects as well as weed control and slowed the process of maintaining trees and shrubs. This time lag also caused the continued deferral of some of our fencing projects. The large brush hog mower had the driveline break twice and the smaller tractor had an engine failure that caused it to be down for over a month. We have modified our budget plan for next

  16. Geosciences projects FY 1985 listing

    Energy Technology Data Exchange (ETDEWEB)

    1986-05-01

    This report, which updates the previous working group publication issued in February 1982, contains independent sections: (A) Summary Outline of DOE Geoscience and Related Studies, and (B) Crosscut of DOE Geoscience and Geoscience Related Studies. The FY 1985 funding levels for geoscience and related activities in each of the 11 programs within DOE are presented. The 11 programs fall under six DOE organizations: Energy Research Conservation and Renewable Energy; Fossil Energy; Defense Programs; Environmental, Safety, and Health; and Civilian radioactive Waste. From time to time, there is particular need for special interprogrammatic coordination within certain topical areas. section B of the report is intended to fill this need for a topical categorization of the Department's geoscience and related activities. These topical areas in Solid Earth Geosciences, Atmospheric Geosciences, Ocean Geosciences, Space and Solar/Terrestrial Geosciences, and Hydrological Geosciences are presented in this report.

  17. National Ignition Facility (NIF) FY2015 Facility Use Plan

    Energy Technology Data Exchange (ETDEWEB)

    Folta, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wisoff, Jeff [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-12-18

    Major features of the FY2015 NIF Use Plan include: • Performing a record number of layered DT experiments with 28 planned compared with 15 in FY2014. Executing the first plutonium experiments on the NIF in support of the Science Campaigns. • Over 300 targets shots, a 57% increase compared to FY14. This is a stretch goal defined in the 120-Day Study document, and relies upon the success of many shot-rate improvement actions, as well as on the distribution of shot type selected by the users. While the Plan is consistent with this goal, the increased proportion of layered DT experiments described above reduces the margin against this goal. • Commissioning of initial ARC capability, which will support both SSP-HED and SSPICF programs. • Increase in days allocated to Discovery Science to a level that supports an ongoing program for academic use of NIF and an annual solicitation for new proposals. • Six Facility Maintenance and Reconfiguration (FM&R) periods totaling 30 days dedicated to major facility maintenance and modifications. • Utilization of the NIF Facility Advisory Schedule Committee (FASC) to provide stakeholder review and feedback on the NIF schedule. The Use Plan assumes a total FY2015 LLNL NIF Operations funding in MTE 10.7 of $229.465M and in MTE 10.3 of 47.0M. This Use Plan will be revised in the event of significant changes to the FY2015 funding or if NNSA provides FY2016 budget guidance significantly reduced compared to FY2015.

  18. Establishment of an eco-compensation fund based on eco-services consumption.

    Science.gov (United States)

    Liu, Moucheng; Yang, Lun; Min, Qingwen

    2018-04-01

    Eco-compensation is a type of institutional arrangement that uses economic measures to adjust the relationships among stakeholders in order to conserve and/or sustainably use ecosystem services. The externality of the value of ecosystem services is one of the theoretical bases for eco-compensation. Different types of ecosystem services are consumed by people from different regions. Some are consumed by people living where the services originate, while some are carried by rivers, wind, vehicles or other natural or manmade means to other areas. Thus, the flow and consumption of ecosystem services should be seen as the basis for establishing eco-compensation funds. This paper uses satellite images of the Zhang-Cheng area near Beijing in 2013 to discuss how to establish an eco-compensation fund for stakeholders in this area. Firstly, six important types of ecosystem services in the Zhang-Cheng area were identified based on ecological function zoning, and the value of these ecosystem services was calculated based on ecological pricing methods. Secondly, the field intensity model from physics was used to analyze where Zhang-Cheng area ecosystem services flowed and calculate how much of these services were used by other areas. Thirdly, based on this analysis and calculation, the paper proposes the rates that different stakeholders should invest in the eco-compensation fund, based on their consumption of eco-services. Copyright © 2018 Elsevier Ltd. All rights reserved.

  19. Accelerator/Experiment Operations - FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    Czarapata, P. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); et al.

    2015-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2015. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2015 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment and Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).

  20. DOE Hydropower Program Annual Report for FY 2003

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Dauble, Dennis D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hunt, Richard T. [Idaho National Lab. (INL), Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab. (INEEL); Sale, Michael J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sommers, Garold L. [Idaho National Lab. (INL), Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab. (INEEL)

    2004-02-01

    This report describes the progress of the R&D conducted in FY 2003 the under four program areas at the time: (1) Advanced Hydropower Technology (Large Turbine Field Testing, Testing of the Alden/NREC pilot scale runner, and Improved Mitigation Practices); (2) Supporting Research and Testing (Biological Design Criteria, Computer and Physical Modeling, Instrumentation and Controls, and Environmental Analysis); (3) Systems Integration and Technology Acceptance (Wind/Hydro Integration Studies and Technical Support and Outreach); and (4) Engineering and Analysis (Innovative Technology Characterization).

  1. Solid Waste Integrated Forecast Technical (SWIFT) Report FY 2001 to FY 2046 Volume 1

    International Nuclear Information System (INIS)

    BARCOT, R.A.

    2001-01-01

    In an effort to maintain an up-to-date Solid Waste Forecast, Fluor Hanford, Inc. requested a midyear update to the FY2001 Solid Waste Forecast collected in June 2000. Below is a list of generators reporting significant changes from the baseline FY2001 forecast, as well as approved generators previously not reporting wastes. The updated data was collected in February 2001. The cumulative effect of the changes in the near term was minor. Included in this update are waste generation maps for onsite facilities. The maps are updated annually and use the baseline forecast as a data reference

  2. 76 FR 9399 - Department of State FY10 Service Contract Inventory

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF STATE [Public Notice 7321] Department of State FY10 Service Contract Inventory... Contract Inventory. SUMMARY: The Department of State has publically released its Service Contract Inventory for FY10. Section 743 of Division C of the FY 2010 Consolidated Appropriations Act, Public Law 111-117...

  3. DOE FY 2010 Budget Request and Recovery Act Funding for Energy Research, Development, Demonstration, and Deployment: Analysis and Recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Anadon, Laura Diaz; Gallagher, Kelly Sims; Bunn, Matthew

    2009-06-01

    The combination of the FY 2010 budget request for the Department of Energy (DOE) and the portion of the American Recovery and Reinvestment Act of 2009 (ARRA) funds likely to be available in 2010 would (assuming that they would be split evenly between FY 2010 and FY 2011) result in a doubling in funding available for energy research, development, and deployment (ERD and D) from $3.6 billion in FY 2009 to $7.2 billion in FY 2010. Without the stimulus funds, DOE ERD and D investments in FY 2010 would decrease very slightly when compared to FY 2009. Excluding the $7.5 billion for the Advanced Technology Vehicles Manufacturing Loans in FY 2009, the FY 2010 budget request for deployment represents a 33 percent decrease from the FY 2009 levels from $520 million to $350 million. This decrease is largely due to the large amounts of funds appropriated in ARRA for DOE deployment programs, or $23.6 billion, which are three times greater than those appropriated in the FY 2009 budget. These very substantial funding amounts, coupled with the broad range of institutional innovations the administration is putting in place and movement toward putting a price on carbon emissions, will help accelerate innovation for a broad range of energy technologies. DOE's Advanced Research Projects Agency-Energy (ARPA-E) and the Energy Innovation Hubs are important initiatives that could contribute to two weak points of the government's energy innovation effort, namely funding high-risk projects in transformational technologies and in companies that have not traditionally worked with the government and strengthening the integration of basic and applied research in priority areas. Increasing the funding for different types of energy storage research, providing some support for exploring opportunities in coal-to-liquids with carbon capture and storage (CCS) and coal-and-biomass-to-liquids with CCS, and reducing funding for fission RD and D are other actions that Congress could take in the

  4. Caloric compensation for sugar-sweetened beverages in meals: A population-based study in Brazil.

    Science.gov (United States)

    Gombi-Vaca, Maria Fernanda; Sichieri, Rosely; Verly, Eliseu

    2016-03-01

    Sugar-sweetened beverage (SSB) consumption can cause positive energy balance, therefore leading to weight gain. A plausible biological mechanism to explain this association is through weak caloric compensation for liquid calories. However, there is an ongoing debate surrounding SSB calorie compensation. The body of evidence comes from a diversity of study designs and highly controlled settings assessing food and beverage intake. Our study aimed to test for caloric compensation of SSB in the free-living setting of daily meals. We analyzed two food records of participants (age 10 years or older) from the 2008-2009 National Dietary Survey (Brazil, N = 34,003). We used multilevel analyses to estimate the within-subject effects of SSB on food intake. Sugar-sweetened beverage calories were not compensated for when comparing daily energy intake over two days for each individual. When comparing meals, we found 42% of caloric compensation for breakfast, no caloric compensation for lunch and zero to 22% of caloric compensation for dinner, differing by household per capita income. In conclusion, SSB consumption contributed to higher energy intake due to weak caloric compensation. Discouraging the intake of SSB especially during lunch and dinner may help reduce excessive energy intake and lead to better weight management. Copyright © 2015 Elsevier Ltd. All rights reserved.

  5. Compensability index for compensation radiotherapy after treatment interruptions

    International Nuclear Information System (INIS)

    Putora, Paul Martin; Schmuecking, Michael; Aebersold, Daniel; Plasswilm, Ludwig

    2012-01-01

    The goal of our work was to develop a simple method to evaluate a compensation treatment after unplanned treatment interruptions with respect to their tumour- and normal tissue effect. We developed a software tool in java programming language based on existing recommendations to compensate for treatment interruptions. In order to express and visualize the deviations from the originally planned tumour and normal tissue effects we defined the compensability index. The compensability index represents an evaluation of the suitability of compensatory radiotherapy in a single number based on the number of days used for compensation and the preference of preserving the originally planned tumour effect or not exceeding the originally planned normal tissue effect. An automated tool provides a method for quick evaluation of compensation treatments. The compensability index calculation may serve as a decision support system based on existing and established recommendations

  6. NTS groundwater recharge study, FY 1992

    International Nuclear Information System (INIS)

    Lyles, B.F.; Mihevc, T.M.

    1992-10-01

    Groundwater recharge from precipitation is thought by many scientists to be extremely low in Southem Nevada; however, no direct measurements of recharge have been made to substantiate this hypothesis. Three geomorphic regions have been identified as potential areas of groundwater recharge at the Nevada Test Site (NTS): mesas, washes, and lowlands. Eight recharge monitoring stations have been installed to monitor each of these regions; four of the stations are on Pahute/Rainier Mesa, two stations are in Fortymile Wash, one station is in a transition area between the mesas and the lowlands (Whiterock Spring), and one station is located in Yucca Flat at the bottom of the U-3fd crater. An additional station is proposed for Frenchman Flat near the Area 5 mixed waste facility; however, the instrumentation of that site has been delayed due to the complex permitting process associated with instrument installation near the mixed waste facility. Digital data were collected from eight sites during FY 1992

  7. South Fork Salmon River Watershed Restoration, 2008-2009 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Reaney, Mark D. [Nez Perce Tribe Department of Fisheries Resource Management

    2009-04-15

    The watershed restoration work elements within the project area, the South Fork Salmon River Watershed, follow the watershed restoration approach adopted by the Nez Perce Tribe Department of Fisheries Resource Management (DFRM) - Watershed Division. The vision of the Nez Perce Tribe DFRM-Watershed Division focuses on protecting, restoring, and enhancing watersheds and treaty resources within the ceded territory of the Nez Perce Tribe under the Treaty of 1855 with the United States Federal Government. The program uses a holistic approach, which encompasses entire watersheds, ridge top to ridge top, emphasizing all cultural aspects and strategies that rely on natural fish production and healthy river ecosystems. The Nez Perce Tribe DFRM-Watershed Division strives towards maximizing historic ecosystem productivity and health for the restoration of anadromous and resident fish populations and the habitat on which all depend on for future generations Originally, this project was funded to create a step/pool stream channel that was appropriate to restore fish passage where the 'Glory Hole Cascade' is currently located at the Stibnite Mine. Due to unforeseen circumstances at the time, the project is unable to move forward as planned and a request for a change in scope of the project and an expansion of the geographic area in which to complete project work was submitted. No additional funds were being requested. The ultimate goal of this project is to work with the holistic, ridge top to ridge top approach to protect and restore the ecological and biological functions of the South Fork Salmon River Watershed to assist in the recovery of threatened and endangered anadromous and resident fish species. FY 2008 Work Elements included two aquatic organism passage (AOP) projects to restore habitat connectivity to two fish-bearing tributaries to the East Fork South Fork Salmon River, Salt and Profile Creeks. The Work Elements also included road survey and assessment

  8. FY2012 CoC Competition Grants (New and Renewal)

    Data.gov (United States)

    Department of Housing and Urban Development — This report displays the FY2012 renewal and new homeless assistance projects awarded by HUD for the FY2012 Continuum of Care (CoC) Program competition. Approximately...

  9. Compensability index for compensation radiotherapy after treatment interruptions

    Directory of Open Access Journals (Sweden)

    Putora Paul

    2012-12-01

    Full Text Available Abstract Background The goal of our work was to develop a simple method to evaluate a compensation treatment after unplanned treatment interruptions with respect to their tumour- and normal tissue effect. Methods We developed a software tool in java programming language based on existing recommendations to compensate for treatment interruptions. In order to express and visualize the deviations from the originally planned tumour and normal tissue effects we defined the compensability index. Results The compensability index represents an evaluation of the suitability of compensatory radiotherapy in a single number based on the number of days used for compensation and the preference of preserving the originally planned tumour effect or not exceeding the originally planned normal tissue effect. An automated tool provides a method for quick evaluation of compensation treatments. Conclusions The compensability index calculation may serve as a decision support system based on existing and established recommendations.

  10. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  11. Mixed Waste Management Facility, revised FY94 Plan

    International Nuclear Information System (INIS)

    Streit, R.

    1994-01-01

    This revision of the FY94 Plan incorporates changes to work during FY94 in response to the DOE request in the DOE KD-1 decision letter of June 28,1994. This letter provided guidance of both scope and budget profile in response to the Conceptual Design Report (CDR) issued by the MWMF Project in April, 1994. This work plan only addresses work for the remainder of FY94. A revised plan for the complete project is in development and will be issued separately. Since February, 1994, the MWMF Project has been operating on DOE guidance directing that work on the CDR be completed, that only other essential work be continued to maintain the project, and that costs be maintained at approximately the January, 1994 spending levels until a KD-1 decision was made. This has formed the basis for monthly reports through June, 1994. The baseline contained in this report will become the basis for reports during the remainder of FY94

  12. DOE Hydropower Program Annual Report for FY 2004

    Energy Technology Data Exchange (ETDEWEB)

    Sommers, Garold L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hunt, Richard T. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sale, Michael J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dauble, Dennis D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ahlgrimm, James [U.S. Dept. of Energy, Washington, D.C. (United States); Acker, Tomas L. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2005-02-01

    This report describes the progress of the R&D conducted in FY 2004 the under four program areas at the time: (1) Advanced Hydropower Technology (Large Turbine Field Testing, Water Use Optimization, and Improved Mitigation Practices); (2) Supporting Research and Testing (Environmental Performance Testing Methods, Computational and Physical Modeling, Instrumentation and Controls, and Environmental Analysis); (3) Systems Integration and Technology Acceptance (Hydro/Wind Integration, National Hydropower Collaborative, and Integration and Communications); and (4) Supporting Engineering and Analysis (Valuation Methods and Assessments and Characterization of Innovative Technology).

  13. The America COMPETES Act and the FY2009 Budget

    National Research Council Canada - National Science Library

    Stine, Deborah D

    2008-01-01

    .... An issue for Congress is whether FY2009 appropriations will. The Presidents s Office of Science and Technology Policy reports that the FY2009 budget request includes funding for America COMPETES Act initiatives at 88...

  14. Idaho National Laboratory Cultural Resource Monitoring Report for FY 2009

    Energy Technology Data Exchange (ETDEWEB)

    Brenda R. Pace; Julie B. Braun

    2009-10-01

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year 2009 (FY 2009). Throughout the year, thirty-eight cultural resource localities were revisited including: two locations with Native American human remains, one of which is a cave, two additional caves, twenty-two prehistoric archaeological sites, six historic homesteads, two historic stage stations, two historic trails, and two nuclear resources, including Experimental Breeder Reactor-I, which is a designated National Historic Landmark. Several INL project areas were also monitored in FY 2009 to assess project compliance with cultural resource recommendations and monitor the effects of ongoing project activities. Although impacts were documented at a few locations and trespassing citations were issued in one instance, no significant adverse effects that would threaten the National Register eligibility of any resources were observed. Monitoring also demonstrated that several INL projects generally remain in compliance with recommendations to protect cultural resources.

  15. Hood River and Pelton Ladder Evaluation Studies, 2008 Annual Report : October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Reagan, Robert E.; Olsen, Erik A. [Oregon Department of Fish and Wildlife

    2009-09-28

    This report summarizes the life history and production data collected in the Hood River subbasin during FY 2008. Included is a summary of jack and adult life history data collected at the Powerdale Dam trap on seventeen complete run years of winter steelhead, spring and fall chinook salmon, and coho salmon, and on fifteen complete run years of summer steelhead. Also included are summaries of (1) the hatchery winter steelhead broodstock collection program; (2) hatchery production releases in the Hood River subbasin; (3) subbasin wild summer and winter steelhead smolt production, (4) numbers of hatchery summer and winter steelhead smolts leaving the subbasin; (5) smolt migration timing past Bonneville Dam, (6) wild and hatchery steelhead smolt-to-adult survival rates; (7) wild summer and winter steelhead egg to smolt survival rates; and (8) streamflow at selected locations in the Hood River subbasin. Data will be used in part to (1) evaluate the HRPP relative to its impact on indigenous populations of resident and anadromous salmonids (see Ardren Draft), (2) evaluate the HRPP's progress towards achieving the biological fish objectives defined in the Hood River Subbasin Plan (Coccoli 2004) and the Revised Master Plan for the Hood River Production Program (HDR|FishPro, ODFW, and CTWSRO 2008), (3) refine spawner escapement objectives to more accurately reflect subbasin carrying capacity, and (4) refine estimates of subbasin smolt production capacity to more accurately reflect current and potential subbasin carrying capacity.

  16. FY11 Facility Assessment Study for Aeronautics Test Program

    Science.gov (United States)

    Loboda, John A.; Sydnor, George H.

    2013-01-01

    This paper presents the approach and results for the Aeronautics Test Program (ATP) FY11 Facility Assessment Project. ATP commissioned assessments in FY07 and FY11 to aid in the understanding of the current condition and reliability of its facilities and their ability to meet current and future (five year horizon) test requirements. The principle output of the assessment was a database of facility unique, prioritized investments projects with budgetary cost estimates. This database was also used to identify trends for the condition of facility systems.

  17. INL Cultural Resource Monitoring Report for FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    Pace, Brenda Ringe [Idaho National Lab. (INL), Idaho Falls, ID (United States); Olson, Christina Liegh [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gilbert, Hollie Kae [Idaho National Lab. (INL), Idaho Falls, ID (United States); Holmer, Marie Pilkington [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-10-01

    of illegal removal of artifacts from INL lands. Goodale‘s Cutoff of the Oregon Trail showed evidence of heavy use associated with grazing. A number of previously reported Type 2 impacts were also once again documented at the EBR-I National Historic Landmark, including spalling and deterioration of bricks due to inadequate drainage, minimal maintenance, and rodent infestation. The ANP engines and locomotive on display at the EBR-I Visitors Center also exhibited impacts related to long term exposure. Finally, most of the Arco NPG properties monitored at Central Facilities Area exhibited problems with lack of timely and appropriate maintenance as well as inadequate drainage. No new Type 3 or Type 4 impacts that adversely affected significant cultural resources and threatened National Register eligibility were documented in FY 2015.

  18. Idaho National Laboratory’s FY09 & FY10 Greenhouse Gas Report

    Energy Technology Data Exchange (ETDEWEB)

    Jennifer D. Morton

    2011-06-01

    A greenhouse gas (GHG) inventory is a systematic approach to account for the production and release of certain gases generated by an institution from various emission sources. The gases of interest are those that climate science has identified as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2009 and 2010 by Idaho National Laboratory (INL), a Department of Energy (DOE)-sponsored entity, located in southeastern Idaho. In recent years, concern has grown about the environmental impact of GHGs. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of an inventory of the total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13514 requires that federal agencies and institutions document reductions in GHG emissions. INL's GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL's organizational boundaries, but are a consequence of INL's activities). This inventory found that INL generated 103,590 and 102,413 MT of CO2-equivalent emissions during FY09 and FY10, respectively. The following conclusions were made from looking at the results of the individual contributors to INL's FY09 and FY10 GHG inventories: (1) Electricity (including the associated transmission and distribution losses) is the largest contributor to INL's GHG inventory, with over 50% of the CO2e

  19. Exploratory Research and Development Fund, FY 1990

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiation biophysics.

  20. A Model of Gravity Vector Measurement Noise for Estimating Accelerometer Bias in Gravity Disturbance Compensation.

    Science.gov (United States)

    Tie, Junbo; Cao, Juliang; Chang, Lubing; Cai, Shaokun; Wu, Meiping; Lian, Junxiang

    2018-03-16

    Compensation of gravity disturbance can improve the precision of inertial navigation, but the effect of compensation will decrease due to the accelerometer bias, and estimation of the accelerometer bias is a crucial issue in gravity disturbance compensation. This paper first investigates the effect of accelerometer bias on gravity disturbance compensation, and the situation in which the accelerometer bias should be estimated is established. The accelerometer bias is estimated from the gravity vector measurement, and a model of measurement noise in gravity vector measurement is built. Based on this model, accelerometer bias is separated from the gravity vector measurement error by the method of least squares. Horizontal gravity disturbances are calculated through EGM2008 spherical harmonic model to build the simulation scene, and the simulation results indicate that precise estimations of the accelerometer bias can be obtained with the proposed method.

  1. A Model of Gravity Vector Measurement Noise for Estimating Accelerometer Bias in Gravity Disturbance Compensation

    Science.gov (United States)

    Cao, Juliang; Cai, Shaokun; Wu, Meiping; Lian, Junxiang

    2018-01-01

    Compensation of gravity disturbance can improve the precision of inertial navigation, but the effect of compensation will decrease due to the accelerometer bias, and estimation of the accelerometer bias is a crucial issue in gravity disturbance compensation. This paper first investigates the effect of accelerometer bias on gravity disturbance compensation, and the situation in which the accelerometer bias should be estimated is established. The accelerometer bias is estimated from the gravity vector measurement, and a model of measurement noise in gravity vector measurement is built. Based on this model, accelerometer bias is separated from the gravity vector measurement error by the method of least squares. Horizontal gravity disturbances are calculated through EGM2008 spherical harmonic model to build the simulation scene, and the simulation results indicate that precise estimations of the accelerometer bias can be obtained with the proposed method. PMID:29547552

  2. Direct regional quasi-geoid determination using EGM2008 and DEM: A case study for Mainland China and its vicinity areas

    Directory of Open Access Journals (Sweden)

    Jin Li

    2015-11-01

    Full Text Available Earth's gravity model (EGM helps people better determine the figure of Earth, which is generally represented by a global geoid. For a considerable amount of practical applications, people use quasi-geoid to approximate the geoid, thus the quasi-geoid is also treated as an important height datum. In this study we revisit the method to directly determine regional quasi-geoid using EGM and digital elevation model (DEM, on the basis of Molodensky theory. According to the method we obtain a 5′ × 5′ quasi-geoid for Mainland China and its vicinity areas, based on the EGM2008 gravitational potential model and the Shuttle Radar Topography Mission (SRTM DEM model. By comparing height anomalies derived from EGM2008 with observations at 70 GPS/leveling points in areas including northwest, mid-west, mid-east and southeast of China, we find that the 5′ × 5′ EGM2008 quasi-geoid well fits the GPS/leveling results, with average deviations less than 10 cm for the selected areas in east China (with mainly plain topography and ∼20 cm for the selected areas in west China (highland or mountainous areas. We also discuss a few technical issues for directly determining height anomalies based on EGM and DEM, under the frame of Molodensky theory.

  3. Reactive power compensation a practical guide

    CERN Document Server

    Hofmann, Wolfgang; Just, Wolfgang

    2012-01-01

    The comprehensive resource on reactive power compensation, presenting the design, application and operation of reactive power equipment and installations The area of reactive power compensation is gaining increasing importance worldwide. If suitably designed, it is capable of improving voltage quality significantly, meaning that losses in equipment and power systems are reduced, the permissible loading of equipment can be increased, and the over-all stability of system operation improved. Ultimately, energy use and CO2 emisson are reduced. This unique guide discusses the

  4. Theoretical Division annual report, FY 1975

    International Nuclear Information System (INIS)

    Carruthers, P.A.

    1976-02-01

    This report presents an overview of the activities in the Theoretical Division and a summary of research highlights during FY 1975. It is intended to inform a wide audience about the theoretical work of the LASL and, therefore, contains introductory material which places recent advances in a broader context. The report is organized into two special interest reports: reactor safety research and the Advanced Research Committee, and 11 reports from the T-Division group leaders on the work of their respective groups. Main interests and responsibilities are outlined including the relationship of the group's work to the work of other T-Division groups and other divisions at the Laboratory. The description of research highlights for FY 1975 explains in a fairly simple, straightforward manner the major recent advances and their significance. Each group report is followed by a publication list for FY 1975 (330 references) and a list of talks given outside the Laboratory (140 references). 29 figures

  5. The stepwise discriminant algorithm for snow cover mapping based on FY-3/MERSI data

    Science.gov (United States)

    Han, Tao; Wang, Dawei; Jiang, Youyan; Wang, Xiaowei

    2013-10-01

    Medium Resolution Spectral Imager (MERSI) on board China's new generation polar orbit meteorological satellite FY- 3A provides a new data source for snow monitoring in large area. As a case study, the typical snow cover of Qilian Mountains in northwest China was selected in this paper to develop the algorithm to map snow cover using FY- 3A/MERSI. By analyzing the spectral response characteristics of snow and other surface elements, as well as each channel image quality on FY-3A/MERSI, the widely used Normalized Difference Snow Index (NDSI) was defined to be computed from channel 2 and channel 7 for this satellite data. Basing on NDSI, a tree-structure prototype version of snow identification model was proposed, including five newly-built multi-spectral indexes to remove those pixels such as forest, cloud shadow, water, lake ice, sand (salty land), or cloud that are usually confused with snow step by step, especially, a snow/cloud discrimination index was proposed to eliminate cloud, apart from use of cloud mask product in advance. Furthermore, land cover land use (LULC) image has been adopted as auxiliary dataset to adjust the corresponding LULC NDSI threshold constraints for snow final determination and optimization. This model is composed as the core of FY-3A/MERSI snow cover mapping flowchart, to produce daily snow map at 250m spatial resolution, and statistics can be generated on the extent and persistence of snow cover in each pixel for time series maps. Preliminary validation activities of our snow identification model have been undertaken. Comparisons of the 104 FY- 3A/MERSI snow cover maps in 2010-2011 snow season with snow depth records from 16 meteorological stations in Qilian Mountains region, the sunny snow cover had an absolute accuracy of 92.8%. Results of the comparison with the snow cover identified from 6 Terra/MODIS scenes showed that they had consistent pixels about 85%. When the two satellite resultant snow cover maps compared with the 6

  6. Integrated Data Collection Analysis (IDCA) Program: FY2011 Project Descriptions

    Energy Technology Data Exchange (ETDEWEB)

    Sandstrom, Mary M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brown, Geoffrey W. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Warner, Kirstin F. [Naval Surface Warfare Center (NSWC-IHD), Indian Head, MD (United States). Indian Head Division; Remmers, Daniel L. [Naval Surface Warfare Center (NSWC-IHD), Indian Head, MD (United States). Indian Head Division; Whinnery, LeRoy L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Shelley, Timothy J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Reyes, Jose A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hsu, Peter C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Reynolds, John G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2012-02-03

    This document provides brief descriptions of research topics for consideration by the IDCA for potential funding in funding in FY 2011. The topics include the utilization of the results from the Proficiency Test developed during FY 2010 to start populating the small-scale safety and thermal testing (SSST) Testing Compendium and revising results from methods modifications. Other research topics were also developed for FY 2011 from issues that arose in the Proficiency Test.

  7. 2nd Quarter Transportation Report FY 2014

    Energy Technology Data Exchange (ETDEWEB)

    Gregory, L. [National Security Technologies, LLC, Las Vegas, NV (United States) (United States)

    2014-07-01

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the second quarter of fiscal year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014 in Tables 4 and 5. Tabular summaries are provided which include the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report do not include minor volumes of non-radioactive materials that were approved for disposal. Volume reports showing cubic feet (ft3) generated using the Low-Level Waste Information System may vary slightly due to differing rounding conventions.

  8. Hanford Diversification and the Tri-Cities Economy FY 1999

    International Nuclear Information System (INIS)

    SCOTT, M.J.

    2000-01-01

    The missions of the U.S. Department of Energy's Richland Operations Office (DOE/RL) are to safely manage the Hanford Site, to manage and clean up its legacy wastes, and to develop and deploy new science and technology in the environmental and energy fields. Collectively, DOE/RL and its contractors are the most important single entity in the Tri-Cities local economy (Pasco, Kennewick, and Richland, Washington, and the surrounding area). Although the relevant economic region affected by DOE/RL and its contractors actually embraces a geographic area reaching from Yakima in the west to Walla Walla in the east and from Moses Lake in the north to Pendleton, Oregon, in the south, over 90% of economic impacts likely occur in Benton and Franklin Counties. These two counties are defined as the ''local'' Tri-Cities economy for purposes of this study. In the federal fiscal year (FY) 1999 (October 1, 1998 through September 30, 1999), the total impact of DOE'S local $1.59 billion budget was felt through payrolls of $542 million and local purchases of goods and services of $226 million. The total local spending of $768 million was up slightly from the FY 1998 total of $765 million. Taking into account the multiplier effects of this spending, the DOE/RL budget sustained an estimated 32% of all local employment (28,250 out of 88,100 jobs) and about 35% of local earned income (almost $1.08 billion out of $3.08 billion). The decrease in these percentages from last year's report reflects an update of the model's economic structure based on the 1997 economic census year, a correction of a programming error in the model found during the update, and a broader definition of earnings that includes proprietor income, not just wages (see the Appendix for revisions to the previous forecasts). DOE budget increases in FY 2000 are expected to result in no change to the number of local DOE contractor jobs and about a $29 million increase in direct local spending

  9. Buried Waste Integrated Demonstration FY-95 Deployment Plan

    Energy Technology Data Exchange (ETDEWEB)

    Stacey, D.E.

    1995-03-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The FY-95 effort will fund 24 technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. Ten of these technologies will take part in the integrated field demonstration that will take place at the Idaho National Engineering Laboratory (INEL) facilities in the summer of 1995. This document is the basic operational planning document for deployment of all BWID projects funded in FY-95. Discussed in this document are the BWID preparations for the INEL integrated field demonstration, INEL research and development (R&D) demonstrations, non-INEL R&D demonstrations, and office research and technical review meetings. Each project will have a test plan detailing the specific procedures, objectives, and tasks of the test. Therefore, information that is specific to testing each technology is intentionally limited in this document.

  10. Buried Waste Integrated Demonstration FY-95 Deployment Plan

    International Nuclear Information System (INIS)

    Stacey, D.E.

    1995-03-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The FY-95 effort will fund 24 technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. Ten of these technologies will take part in the integrated field demonstration that will take place at the Idaho National Engineering Laboratory (INEL) facilities in the summer of 1995. This document is the basic operational planning document for deployment of all BWID projects funded in FY-95. Discussed in this document are the BWID preparations for the INEL integrated field demonstration, INEL research and development (R ampersand D) demonstrations, non-INEL R ampersand D demonstrations, and office research and technical review meetings. Each project will have a test plan detailing the specific procedures, objectives, and tasks of the test. Therefore, information that is specific to testing each technology is intentionally limited in this document

  11. InterProScan Result: FY739668 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available FY739668 FY739668_1_ORF1 51F1790620AF007E PANTHER PTHR21347 CLEFT LIP AND PALATE ASSOCIATED TRANSME...MBRANE PROTEIN-RELATED 1.4e-64 T IPR008429 Cleft lip and palate transmembrane 1 ...

  12. Federal Research and Development Funding: FY2011

    Science.gov (United States)

    2011-03-25

    NSF’s offices in 54 Arden L. Bement, Jr., Transformative Research: The Artistry and Alchemy of the 21st... financing for the Technology Innovation Program (TIP) increases 14.3% over FY2010 funding to $79.9 million. The construction budget declines 15.1% to $124.8...Extension Partnership Program received $124.7 million, 13.4% more than FY2009, while financing for TIP increased 7.5% to $69.9 million. Construction

  13. EST Table: FY033047 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available FY033047 rbmte3b19 11/12/09 n.h 11/11/04 43 %/139 aa ref|XP_974421.1| PREDICTED: similar to synoviolin...staneum] 11/11/04 n.h 11/11/04 n.h 11/11/04 n.h 11/11/04 n.h 11/11/04 39 %/139 aa gi|91087035|ref|XP_974421.1| PREDICTED: similar to synoviolin [Tribolium castaneum] FY033047 bmte ...

  14. Idaho National Laboratory’s Greenhouse Gas FY08 Baseline

    Energy Technology Data Exchange (ETDEWEB)

    Jennifer D. Morton

    2010-09-01

    A greenhouse gas (GHG) inventory is a systematic attempt to account for the production and release of certain gasses generated by an institution from various emission sources. The gasses of interest are those which have become identified by climate science as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2008 by Idaho National Laboratory (INL), a Department of Energy (DOE)-sponsored entity, located in southeastern Idaho. Concern about the environmental impact of GHGs has grown in recent years. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of a baseline estimate of total GHGs generated at the INL. Additionally, the INL has a desire to see how its emissions compare with similar institutions, including other DOE-sponsored national laboratories. Executive Order 13514 requires that federally-sponsored agencies and institutions document reductions in GHG emissions in the future, and such documentation will require knowledge of a baseline against which reductions can be measured. INL’s FY08 GHG inventory was calculated according to methodologies identified in Federal recommendations and an as-yet-unpublished Technical and Support Document (TSD) using operational control boundary. It measures emissions generated in three Scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL’s organizational boundaries but are a consequence of INL’s activities). This inventory found that INL generated a total of 114,256 MT of CO2-equivalent emissions during fiscal year 2008 (FY08). The following conclusions were made from looking at the results of the individual contributors to INL

  15. Compensation in Swedish infrastructure projects and suggestions on policy improvements

    Directory of Open Access Journals (Sweden)

    Jesper Persson

    2015-07-01

    Full Text Available Environmental compensation includes a range of activities intended to counterbalance such negative impacts of development projects that remain in the environment after all preventive and corrective measures have been fully implemented. Sweden, being a member state of the European Union (EU, must implement environmental compensation under EU directives such as the Habitat Directive. However, like in other countries, implementation is not yet widespread in Sweden, and new practices and guidelines remain to be developed both nationally and at European level. This need is all the more urgent considering that the European Commission estimates that, within the EU, about 100,000 hectares of land is converted from its natural state each year. The aim of this paper is to describe current environmental-compensation practices in Swedish road and railway projects and to discuss issues of vital importance to the development of compensation policy, such as what to compensate for, how much, and how. A national inventory was performed, for the first time in Sweden, to identify compensation measures in road and railway projects. Data were collected from a national mailing list including 141 officials at county administrative boards (CABs, internal e-mail correspondence within the Swedish Transport Administration and databases of court decisions. The inventory focused on compensation measures ordered by virtue of the Swedish Environmental Code. In addition, two case studies were carried out to investigate the planning of compensation measures. The results showed that CABs and courts rarely order compensation in infrastructure projects, even though this is possible under Swedish law. Between 1999 and 2012, 37 cases (i.e. permits issued were found for which compensation was ordered. Of these cases, 76% concerned compensation for encroachments on minor habitats such as small ponds and cairns. No CAB ordered compensation for non-protected areas. Compensation ratios

  16. Identification of land cover changes in the coastal area of Dakshina Kannada district, South India during the year 2004–2008

    Directory of Open Access Journals (Sweden)

    J. Jayanth

    2016-06-01

    Full Text Available This study investigates land cover (LC changes in the coastal area of Dakshina Kannada district in the state of Karnataka, South India, during the years 2004–2008 as a case study. IRS P-6, Linear Imaging Self Scanning sensor (LISS-IV satellite images were used in the present work. Classification was carried out using artificial bee colony algorithm and support vector machine (SVM which gave a better result compared to other traditional classification techniques. The best overall classification accuracy for the study area was achieved with an ABC classifier with an OCA of 80.35% for 2004 year data and OCA of 80.40% for 2008 year data, whereas the OCA in SVM, for the same training set is 71.42% for 2004 data and 71.38% for 2008 data on study area 1 and the results were optimised with respect to multispectral data. In study area 2, ABC algorithm achieved an OCA of 78.17% and MLC of 62.63% which was used to check the universality of the classifier. The classification results with post-classification technique for study area 1 indicate that urbanisation in the study area has almost increased twice. During the same time there is an increase in the forest plantation, agricultural plantation and a decrease in crop land and land without scrubs, indicates rapid changes in the coastal environment.

  17. InterProScan Result: FY753977 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available FY753977 FY753977_4_ORF1 DC54D40DFB54A4B1 PFAM PF05753 TRAP_beta NA ? IPR008856 unintegrated Cellular... Component: endoplasmic reticulum (GO:0005783)|Cellular Component: integral to membrane (GO:0016021) ...

  18. Report on assessment of electrical equipment aging for nuclear power plant (AEA), FY2011

    International Nuclear Information System (INIS)

    Minakawa, T.

    2012-11-01

    Electrical components with safety function used in nuclear power plants, such as cables, medium voltage motors, low voltage motors, electrical penetration of reactor containment vessel, motor operated valve, pressure transmitter, temperature detector, etc, are required to be operational under the environment of design basis event (DBE) to shut down a reactor safely and to prevent radioactive materials from being leaked to outside. Polymer materials used as parts of these equipments are gradually degraded by thermal and radiation environment in the normal operation. In addition, the degradation is thought to progress rapidly when they are exposed to the DBE environment and a decrease in performance of the equipment may be caused. From these reason, electrical components with safety function are tested for long-term integrity in accordance with IEEE standard. However, conventional method of accelerated aging which assumes thermal and radiation aging during normal operation is said to have uncertainty in simulating the degradation given in actual operating environment. To address this issue, the project of 'Assessment of Cable Aging for Nuclear Power Plants' (ACA, 2002-2008) was carried out and 'Guide for Cable Environmental Qualification Test for Nuclear Power Plant' was developed. The need for developing an aging evaluation method for other electrical and I and C components was pointed out in the 'Strategy maps 2007', prepared by the cooperation among government, industry and academia. Under the circumstance, the project of 'Assessment of Electrical Equipment Aging for Nuclear Power Plants' (AEA) was initiated in FY2008. In this study, parts of electrical and I and C component with safety function used in nuclear power plant whose aging needs to be considered are employed as specimens, and their aging characteristics under the thermal environment and the combined radiation and thermal environment are obtained (herein after referred to as 'critical part test

  19. Pinellas Plant FY1990 site specific implementation plan

    International Nuclear Information System (INIS)

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  20. On the compensating filter in pulmonary hilar tomography

    International Nuclear Information System (INIS)

    Okayama, Akio; Nakanishi, Takashi; Fujikawa, Tsuyoshi

    1980-01-01

    It is difficult to make the optimal density for all area of the pulmonary hilar region on a same film in conventional tomography. But, it is possible to observe all area of the pulmonary hilar region on a same film by equalizing the uneven density of pulmonary hilar region with compensating filter. On this study, the filter which could compensated density in all shifts of Polytome U was constructed and discussed about diagnostic evaluation for those shifts. As a results, by using this filter, the density for all area of the pulmonary hilar region in all shifts of Polytome U could be compensated and grasp the mutral relation of its region. As a conclusion, using this filter is useful method to diagnose pulmonary hilar region. If it is possible to make a patient enough hold a breath, using circular shift is better than other's. If it is difficult to do so, it can not help using linear shift. In such a case, it shall be taken a tomograph in direction of linear shift fitting the object. (author)

  1. The Chinese FY-1 Meteorological Satellite Application in Observation on Oceanic Environment

    Science.gov (United States)

    Weimin, S.

    meteorological satellite is stated in this paper. exploration of the ocean resources has been a very important question of global strategy in the world. The exploration of the ocean resources includes following items: Making full use of oceanic resources and space, protecting oceanic environment. to observe the ocean is by using of satellite. In 1978, US successfully launched the first ocean observation satellite in the world --- Sea Satellite. It develops ancient oceanography in to advanced space-oceanography. FY-1 B and FY- IC respectively. High quality data were acquired at home and abroad. FY-1 is Chinese meteorological satellite, but with 0.43 ~ 0.48 μm ,0.48 ~ 0.53 μm and 0.53 ~ 0.58 μm three ocean color channels, actually it is a multipurpose remote sensing satellite of meteorology and oceanography. FY-1 satellite's capability of observation on ocean partly, thus the application field is expanded and the value is increased. With the addition of oceanic channels on FY-1, the design of the satellite is changed from the original with meteorological observation as its main purpose into remote sensing satellite possessing capability of observing meteorology and ocean as well. Thus, the social and economic benefit of FY-1 is increased. the social and economic benefit of the development of the satellite is the key technique in the system design of the satellite. technically feasible but also save the funds in researching and manufacturing of the satellite, quicken the tempo of researching and manufacturing satellite. the scanning radiometer for FY-1 is conducted an aviation experiment over Chinese ocean. This experiment was of vital importance to the addition of oceanic observation channel on FY-1. FY-1 oceanic channels design to be correct. detecting ocean color. This is the unique character of Chinese FY-1 meteorological satellite. meteorological remote sensing channel on FY-1 to form detecting capability of three visible channels: red, yellow and blue

  2. Nevada Test Site-Directed Research and Development: FY 2006 Report

    International Nuclear Information System (INIS)

    Wil Lewis, editor

    2007-01-01

    The Nevada Test Site Directed Research and Development (SDRD) program completed its fifth successful year of research and development activities in FY 2006. Forty new projects were selected for funding this year, and ten FY 2005 projects were brought to conclusion. The total funds expended by the SDRD program were $6 million, for an average per-project cost of $120 thousand. Beginning in May, 2006 programmatic burden rates were applied to SDRD project costs. An external audit conducted in September 2006 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: the filing of 27 invention disclosures for intellectual property generated by FY 2006 projects; programmatic adoption of four FY 2005 SDRD-developed technologies; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2006 projects; and the successful completion of 50 R and D projects, as presented in this report

  3. Nevada Test Site-Directed Research and Development: FY 2006 Report

    Energy Technology Data Exchange (ETDEWEB)

    Wil Lewis, editor

    2007-08-01

    The Nevada Test Site–Directed Research and Development (SDRD) program completed its fifth successful year of research and development activities in FY 2006. Forty new projects were selected for funding this year, and ten FY 2005 projects were brought to conclusion. The total funds expended by the SDRD program were $6 million, for an average per-project cost of $120 thousand. Beginning in May, 2006 programmatic burden rates were applied to SDRD project costs. An external audit conducted in September 2006 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: the filing of 27 invention disclosures for intellectual property generated by FY 2006 projects; programmatic adoption of four FY 2005 SDRD-developed technologies; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2006 projects; and the successful completion of 50 R&D projects, as presented in this report.

  4. Annual Performance Assessment and Composite Analysis Review for the ICDF Landfill FY 2008

    International Nuclear Information System (INIS)

    Koslow, Karen; Rood, Arthur

    2009-01-01

    This report addresses low-level waste disposal operations at the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) landfill from the start of operations in Fiscal Year 2003 through Fiscal Year 2008. The ICDF was authorized in the Operable Unit 3-13 Record of Decision for disposal of waste from the Idaho National Laboratory Site CERCLA environmental restoration activities. The ICDF has been operating since 2003 in compliance with the CERCLA requirements and the waste acceptance criteria developed in the CERCLA process. In developing the Operable Unit 3-13 Record of Decision, U.S. Department of Energy Order (DOE) 435.1, 'Radioactive Waste Management', was identified as a 'to be considered' requirement for the ICDF. The annual review requirement under DOE Order 435.1 was determined to be an administrative requirement and, therefore, annual reviews were not prepared on an annual basis. However, the landfill has been operating for 5 years and, since the waste forms and inventories disposed of have changed from what was originally envisioned for the ICDF landfill, the ICDF project team has decided that this annual review is necessary to document the changes and provide a basis for any updates in analyses that may be necessary to continue to meet the substantive requirements of DOE Order 435.1. For facilities regulated under DOE Order 435.1-1, U.S. DOE Manual 435.1-1, 'Radioactive Waste Management', IV.P.(4)(c) stipulates that annual summaries of low-level waste disposal operations shall be prepared with respect to the conclusions and recommendations of the performance assessment and composite analysis. Important factors considered in this review include facility operations, waste receipts, and results from monitoring and research and development programs. There have been no significant changes in operations at the landfill in respect to the disposal geometry, the verification of waste characteristics, and the

  5. Annual Performance Assessment and Composite Analysis Review for the ICDF Landfill FY 2008

    Energy Technology Data Exchange (ETDEWEB)

    Karen Koslow

    2009-08-31

    This report addresses low-level waste disposal operations at the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) landfill from the start of operations in Fiscal Year 2003 through Fiscal Year 2008. The ICDF was authorized in the Operable Unit 3-13 Record of Decision for disposal of waste from the Idaho National Laboratory Site CERCLA environmental restoration activities. The ICDF has been operating since 2003 in compliance with the CERCLA requirements and the waste acceptance criteria developed in the CERCLA process. In developing the Operable Unit 3-13 Record of Decision, U.S. Department of Energy Order (DOE) 435.1, 'Radioactive Waste Management', was identified as a 'to be considered' requirement for the ICDF. The annual review requirement under DOE Order 435.1 was determined to be an administrative requirement and, therefore, annual reviews were not prepared on an annual basis. However, the landfill has been operating for 5 years and, since the waste forms and inventories disposed of have changed from what was originally envisioned for the ICDF landfill, the ICDF project team has decided that this annual review is necessary to document the changes and provide a basis for any updates in analyses that may be necessary to continue to meet the substantive requirements of DOE Order 435.1. For facilities regulated under DOE Order 435.1-1, U.S. DOE Manual 435.1-1, 'Radioactive Waste Management', IV.P.(4)(c) stipulates that annual summaries of low-level waste disposal operations shall be prepared with respect to the conclusions and recommendations of the performance assessment and composite analysis. Important factors considered in this review include facility operations, waste receipts, and results from monitoring and research and development programs. There have been no significant changes in operations at the landfill in respect to the disposal geometry, the verification of

  6. FY 1995 remedial investigation work plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Watkins, D.R.; Herbes, S.E.

    1994-09-01

    Field activities to support the remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) include characterization of the nature and extent of contamination in WAG 2, specifically to support risk-based remediation decisions. WAG 2 is the major drainage system downgradient of other WAGs containing significant sources of contamination at ORNL. The RI of WAG 2 is developed in three phases: Phase 1, initial scoping characterization to determine the need for early action; Phase 2, interim activities during remediation of upgradient WAGs to evaluate potential changes in the contamination status of WAG 2 that would necessitate reevaluation of the need for early action; and Phase 3, completion of the RI process following remediation of upslope WAGs. Specifically, Phase 2 activities are required to track key areas to determine if changes have occurred in WAG 2 that would require (1) interim remedial action to protect human health and the environment or (2) changes in remedial action plans and schedules for WAG2 because of changing contaminant release patterns in upslope WAGs or because of the effects of interim remedial or removal actions in other WAGs. This report defines activities to be conducted in FY 1995 for completion of the Phase 1 RI and initiation of limited Phase 2 field work

  7. Hanford Site Environment Safety and Health (ES and H) FY 1999 and FY 2000 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    1999-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the S&H resources that support these activities. The fiscal year (FY) 1999 and 2000 information (Sieracki 1999) and data contained in the ''Hanford Site Environment, Safety and Health Fiscal Year 2001 Budget-Risk Management Summary'' (RL 1999) were the basis for preparing this report. Fiscal year 2000 finding of Office of Environmental Management (EM) and Office of Nuclear Energy, Science and Technology (NE) activities is based on the President's budget of $1,065.1 million and $28.0 million, plus $2.7 million carryover finding, respectively, as of October 31, 1999. Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2002 ES&H Budget-Risk Management Summary to be issued in May 2000. This report provides the end-of-year status of FY 1999 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2000 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H ''Guidance for FY200l Budget Formulations and Execution'' (DOE 1999).

  8. Human Factors Regulatory Research Program Plan, FY 1989--FY 1992

    International Nuclear Information System (INIS)

    Coffman, F.; Persensky, J.; Ryan, T.; Ramey-Smith, A.; Goodman, C.; Serig, D.; Trager, E; Nuclear Regulatory Commission, Washington, DC; Nuclear Regulatory Commission, Washington, DC; Nuclear Regulatory Commission, Washington, DC

    1989-10-01

    This report describes the currently ongoing (FY 1989) and planned (FY 1989-1992) Human Factors Regulatory Research Program in the NRC Office of Nuclear Regulatory Research (RES). Examples of the influence of human factors on nuclear safety are presented, and the role of personnel is discussed. Current regulatory issues associated with human factors in the nuclear system and the purpose of the research plan are provided. The report describes the research process applied to the human factors research issues and the program activities: Personnel Performance Measurement, Personnel Subsystem, Human-System Interface. Organization and Management, and Reliability Assessment. The research being conducted within each activity is summarized along with the objectives, background information, and expected regulatory products. Budget and personnel forecasts are provided along with a summary of contractors performing some of the ongoing research. Appendices contain a chronology of human factors research at NRC, a description of the research approach, an update on human factors programs and initiatives in RES and other NRC offices, and the integration among these programs. 46 refs., 5 tabs

  9. InterProScan Result: FY040353 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available FY040353 FY040353_5_ORF1 5F3C43B91532A0C1 PANTHER PTHR21347 CLEFT LIP AND PALATE ASSOCIATED TRANSME...MBRANE PROTEIN-RELATED 2.9e-112 T IPR008429 Cleft lip and palate transmembrane 1 ...

  10. EM-50 Tanks Focus Area retrieval process development and enhancements. FY97 technology development summary report

    International Nuclear Information System (INIS)

    Rinker, M.W.; Bamberger, J.A.; Alberts, D.G.

    1997-09-01

    The Retrieval Process Development and Enhancements (RPD and E) activities are part of the US Department of Energy (DOE) EM-50 Tanks Focus Area, Retrieval and Closure program. The purpose of RPD and E is to understand retrieval processes, including emerging and existing technologies, and to gather data on these processes, so that end users have requisite technical bases to make retrieval decisions. Technologies addressed during FY97 include enhancements to sluicing, the use of pulsed air to assist mixing, mixer pumps, innovative mixing techniques, confined sluicing retrieval end effectors, borehole mining, light weight scarification, and testing of Russian-developed retrieval equipment. Furthermore, the Retrieval Analysis Tool was initiated to link retrieval processes with tank waste farms and tank geometric to assist end users by providing a consolidation of data and technical information that can be easily assessed. The main technical accomplishments are summarized under the following headings: Oak Ridge site-gunite and associated tanks treatability study; pulsed air mixing; Oak Ridge site-Old Hydrofracture Facility; hydraulic testbed relocation; cooling coil cleaning end effector; light weight scarifier; innovative tank mixing; advanced design mixer pump; enhanced sluicing; Russian retrieval equipment testing; retrieval data analysis and correlation; simulant development; and retrieval analysis tool (RAT)

  11. Advanced energy projects FY 1994 research summaries

    International Nuclear Information System (INIS)

    1994-09-01

    The Division of Advanced Energy Projects (AEP) provides support to explore the feasibility of novel, energy-related concepts that evolve from advances in basic research. These concepts are typically at an early stage of scientific definition and, therefore, are premature for consideration by applied research or technology development programs. The AEP also supports high-risk, exploratory concepts that do not readily fit into a program area but could have several applications that may span scientific disciplines or technical areas. Projects supported by the Division arise from unsolicited ideas and concepts submitted by researchers. The portfolio of projects is dynamic and reflects the broad role of the Department in supporting research and development for improving the Nation's energy outlook. FY 1994 projects include the following topical areas: novel materials for energy technology; renewable and biodegradable materials; exploring uses of new scientific discoveries; alternate pathways to energy efficiency; alternative energy sources; and innovative approaches to waste treatment and reduction. Summaries are given for 66 projects

  12. US EPA Nonattainment Areas and Designations-8 Hour Ozone (2008 NAAQS)

    Data.gov (United States)

    U.S. Environmental Protection Agency — This web service contains the following layers: Ozone 2008 NAAQS NAA State Level and Ozone 2008 NAAQS NAA National Level. Full FGDC metadata records for each layer...

  13. DOE Hydropower Program Biennial Report for FY 2005-2006

    Energy Technology Data Exchange (ETDEWEB)

    Sale, Michael J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Acker, Thomas L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Northern Arizona State Univ., Flagstaff, AZ (United States); Carlson, Thomas [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Dauble, Dennis D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hall, Douglas G. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2006-07-01

    This report describes the progress of the R&D conducted in FY 2005-2006 the under four program areas at the time: (1) Advanced Hydropower Technology (Large Turbine Field Testing, Water Use Optimization, and Improved Mitigation Practices); (2) Supporting Research and Testing (Environmental Performance Testing Methods, Computational and Physical Modeling, Instrumentation and Controls, and Environmental Analysis); (3) Systems Integration and Technology Acceptance (Hydro/Wind Integration, National Hydropower Collaborative, and Integration and Communications); and (4) Supporting Engineering and Analysis (Valuation Methods and Assessments and Characterization of Innovative Technology).

  14. Department of Defense Manpower Requirements Report, FY 1985. Volume III. Force Readiness Report.

    Science.gov (United States)

    1984-02-01

    normally on a reimburs - able basis unless they support the mission of DoD. The Army Reserve increase in FY 1985 is a result of increased support of...Normally, such cross assignment is made on a reimbursable basis. Navy Federal Agency Support Manpower (End Strength in Thousands) FY 83 FY 84 FY 85 (Actual... reimburses the Air Force Industrial Funds for depot maintenance costs with the exception of military personnel costs. For items procured from the Stock

  15. Accelerator/Experiment Operations - FY 2016

    International Nuclear Information System (INIS)

    Blake, A.; Convery, M.; Geer, S.; Geesaman, D.; Harris, D.; Johnson, D.; Lang, K.; McFarland, K.; Messier, M.; Moore, C. D.; Newhart, D.; Reimer, P. E.; Plunkett, R.; Rominsky, M.; Sanchez, M.; Schmidt, J. J.; Shanahan, P.; Tate, C.; Thomas, J.; Donatella Torretta, Donatella Torretta; Matthew Wetstein, Matthew Wetstein

    2016-01-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  16. Accelerator/Experiment Operations - FY 2016

    Energy Technology Data Exchange (ETDEWEB)

    Blake, A. [Argonne National Lab. (ANL), Argonne, IL (United States); Convery, M. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geer, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geesaman, D. [Argonne National Lab. (ANL), Argonne, IL (United States); Harris, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Johnson, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Lang, K. [Argonne National Lab. (ANL), Argonne, IL (United States); McFarland, K. [Argonne National Lab. (ANL), Argonne, IL (United States); Messier, M. [Argonne National Lab. (ANL), Argonne, IL (United States); Moore, C. D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Newhart, D. [Fermilab; Reimer, P. E. [Argonne; Plunkett, R. [Fermilab; Rominsky, M. [Fermilab; Sanchez, M. [Iowa State U.; Schmidt, J. J. [Fermilab; Shanahan, P. [Fermilab; Tate, C. [Fermilab; Thomas, J. [University Coll. London; Donatella Torretta, Donatella Torretta [Fermilab; Matthew Wetstein, Matthew Wetstein [Iowa State University

    2016-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  17. Voluntary research results for five years along the master plan on nuclear safety research. FY 2001 - 2005

    International Nuclear Information System (INIS)

    Sato, Yoshinori

    2006-05-01

    Safety Research has been conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005) in Japan Atomic Energy Agency which took over former Japan Nuclear Cycle Development Institute. This report shows the voluntary research results for five years conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005). (author)

  18. Exploratory Research and Development Fund, FY 1990

    International Nuclear Information System (INIS)

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R ampersand D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R ampersand D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiation biophysics

  19. Losses compensation; Compensation des pertes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    One mission of RTE (Electric Power Transportation), is to watch over the losses compensation resulting from the power transport on the electric power network. Since january 2001, RTE makes good the electric losses by the purchase of energy. To choose the marketers, a consultation has been realized by RTE. This document presents the rules concerning these losses compensation. (A.L.B.)

  20. Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Will [comp.

    2006-09-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did an exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.

  1. TRAC-Monterey FY16 Work Program Development and Report of Research Elicitation

    Science.gov (United States)

    2016-01-01

    any changes to priorities or additional projects that require immediate research. Work Program; Research Elicitation Unclassified UU UU UU UU 35 MAJ...conduct analysis for the Army. 1 Marks, Chris, Nesbitt, Peter. TRAC FY14 Research Requirements Elicitation . Technical Report TRAC-M-TM-13-059. 700 Dyer... Requirements Elicitation Interviews Interview Guide: 1. Describe a research requirement in the areas of topics, techniques, and methodologies. 2

  2. LANL C10.2 Projects in FY13

    International Nuclear Information System (INIS)

    Batha, Steven H.; Fincke, James R.; Schmitt, Mark J.

    2012-01-01

    LANL has two projects in C10.2: Defect-Induced Mix Experiment (DIME) (ongoing, several runs at Omega; NIF shots this summer); and Shock/Shear (tested at Omega for two years; NIF shots in second half of FY13). Each project is jointly funded by C10.2, other C10 MTEs, and Science Campaigns. DIME is investigating 4π and feature-induced mix in spherically convergent ICF implosions by using imaging of the mix layer. DIME prepared for NIF by demonstrating its PDD mix platform on Omega including imaging mid-Z doped layers and defects. DIME in FY13 will focus on PDD symmetry-dependent mix and moving burn into the mix region for validation of mix/burn models. Re-Shock and Shear are two laser-driven experiments designed to study the turbulent mixing of materials. In FY-2012 43 shear and re-shock experimental shots were executed on the OMEGA laser and a complete time history obtained for both. The FY-2013 goal is to transition the experiment to NIF where the larger scale will provide a longer time period for mix layer growth.

  3. Conceptual design study of fusion experimental reactor (FY86 FER)

    International Nuclear Information System (INIS)

    Saito, Ryusei; Kashihara, Shin-ichiro; Itoh, Shin-ichi

    1987-08-01

    This report describes the results of conceptual design study on plant systems for the Fusion Experimental Reactor (FY86 FER). Design studies for FER plant systems have been continued from FY85, especially for design modifications made in accordance with revisions of plasma scaling parameters and system improvements. This report describes 1) system construction, 2) site and reactor building plan, 3) repaire and maintenance system, 4) tritium circulation system, 5) heating, ventilation and air conditioning system, 6) tritium clean-up system, 7) cooling and baking system, 8) waste treatment and storage system, 9) control system, 10) electric power system, 11) site factory plan, all of which are a part of FY86 design work. The plant systems described in this report generally have been based on the FY86 FER (ACS Reactor) which is an one of the six candidates for FER. (author)

  4. A Status Report on the Major Accounting and Management Control Deficiencies in the Defense Business Operations Fund for FY 1996

    National Research Council Canada - National Science Library

    1997-01-01

    ... Defense Business Operations Fund. The Defense Business Operations Fund was established as a revolving fund in FY 1992 and consisted of business areas such as Supply Management and Depot Maintenance...

  5. Photovoltaic Subcontract Program, FY 1991. Annual report, [October 1, 1990--September 30, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    This report summarizes the fiscal year (FY) 1991 (October 1, 1990, through September 30, 1991) progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL) -- formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, the University Participation Program, and the Photovoltaic Manufacturing Technology (PVMaT) project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1991, and future research directions.

  6. Creative compensation

    International Nuclear Information System (INIS)

    Coll, D.

    1994-01-01

    A discussion is presented of executive compensation in Canada's petroleum industry. Mandatory disclosure of executive compensation and benefits is regulated by the Ontario Securities Commission. Examination of the compensation packages of 80 oilpatch CEOs shows a clear difference in philosophy between large and small companies. Larger companies pay larger salaries, offer pension plans, and reward long-term loyalty. Within smaller companies, compensation tends to be linked with stock performance. Trends in compensation are to lower base salaries with more variables such as bonuses, cash incentives and gain-sharing programs. Increasing shareholder scrutiny is prompting more stringent guidelines on stock option plans. Some companies place performance conditions on stock vesting. Another option is to grant premium priced options to executives, to increase the gains required for the executive to post a profit. Other comapanies are granting stock options to their field personnel, or are granting stock to all employees. Directors are playing an increasing role in executive compensation. 4 tabs

  7. Creative compensation

    Energy Technology Data Exchange (ETDEWEB)

    Coll, D

    1994-09-19

    A discussion is presented of executive compensation in Canada's petroleum industry. Mandatory disclosure of executive compensation and benefits is regulated by the Ontario Securities Commission. Examination of the compensation packages of 80 oilpatch CEOs shows a clear difference in philosophy between large and small companies. Larger companies pay larger salaries, offer pension plans, and reward long-term loyalty. Within smaller companies, compensation tends to be linked with stock performance. Trends in compensation are to lower base salaries with more variables such as bonuses, cash incentives and gain-sharing programs. Increasing shareholder scrutiny is prompting more stringent guidelines on stock option plans. Some companies place performance conditions on stock vesting. Another option is to grant premium priced options to executives, to increase the gains required for the executive to post a profit. Other comapanies are granting stock options to their field personnel, or are granting stock to all employees. Directors are playing an increasing role in executive compensation. 4 tabs.

  8. FY 2000 report on the results of the data processing in the geothermal development promotion survey. Tertiary. No.B-7 Kuwanosawa area; 2000 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No. B-7 Kuwanosawa chiiki (Dai 3 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    The comprehensive analysis was conducted of various data obtained in the geothermal development promotion survey conducted in the Kuwanosawa area, Yuzawa city, Akita prefecture, from FY 1998 to FY 2000. The geology of the Kuwanosawa area consists of the Pretertiary system and Quarternary system, through which intrusive rocks are recognized. Basement rocks are composed of the Paleozoic-origin crystalline schist and the Cretaceous-period granites which intruded into the schist. In the Kuwanosawa area, there were recognized no clear geothermal signs such as the discharge of geothermal fluids like hot spring, fumarolic gas, etc., places of high temperature and new geothermal alteration zones. The geothermal water of borehole N11-KN-1 is a low temperature/low CL concentration geothermal water which was stored in basement rocks, which is supposed to be the one conductively heated in the process of the meteoric water penetrating deep-underground. The geothermal system heat source in the Kuwanosawa area and the periphery is regarded as the relic magma which spewed out the volcanic rocks of Mt. Takamatsu-dake in the Quaternary period. However, the geothermal fluid included no components originating in high temperature volcanic emissions, and therefore, it is considered that the geothermal fluid was formed by the meteoric water conductively heated by volcanic heat source. (NEDO)

  9. Competence in confirming correct placement of nasogastric feeding tubes amongst FY1 doctors

    OpenAIRE

    Lee, Sindy; Mason, Eleanor

    2013-01-01

    Foundation year one (FY1) doctors are required to confirm correct placement of nasogastric (NG) feeding tubes on chest radiography on a regular basis. Many FY1s do not receive formal training during medical school or during the FY1 year. Multiple incidents of harm to patients, including death, resulting from incorrect placement of an NG feeding tube have been reported to the National Patient Safety Agency (NPSA) since 2005. Our audit assessed the confidence and knowledge of FY1 doctors in cor...

  10. Laboratory Directed Research and Development FY-10 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Dena Tomchak

    2011-03-01

    The FY 2010 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support the future DOE missions and national research priorities. LDRD is essential to the INL -- it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enhances technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development.

  11. Area G perimeter surface-soil and single-stage water sampling. Environmental surveillance for fiscal year 95. Progress report

    International Nuclear Information System (INIS)

    Childs, M.; Conrad, R.

    1997-09-01

    ESH-19 personnel collected soil and single-stage water samples around the perimeter of Area G at Los Alamos National Laboratory (LANL) during FY 95 to characterize possible radionuclide movement out of Area G through surface water and entrained sediment runoff. Soil samples were analyzed for tritium, total uranium, isotopic plutonium, americium-241, and cesium-137. The single-stage water samples were analyzed for tritium and plutonium isotopes. All radiochemical data was compared with analogous samples collected during FY 93 and 94 and reported in LA-12986 and LA-13165-PR. Six surface soils were also submitted for metal analyses. These data were included with similar data generated for soil samples collected during FY 94 and compared with metals in background samples collected at the Area G expansion area

  12. Theoretical Division annual report, FY 1975. [LASL

    Energy Technology Data Exchange (ETDEWEB)

    Carruthers, P.A.

    1976-02-01

    This report presents an overview of the activities in the Theoretical Division and a summary of research highlights during FY 1975. It is intended to inform a wide audience about the theoretical work of the LASL and, therefore, contains introductory material which places recent advances in a broader context. The report is organized into two special interest reports: reactor safety research and the Advanced Research Committee, and 11 reports from the T-Division group leaders on the work of their respective groups. Main interests and responsibilities are outlined including the relationship of the group's work to the work of other T-Division groups and other divisions at the Laboratory. The description of research highlights for FY 1975 explains in a fairly simple, straightforward manner the major recent advances and their significance. Each group report is followed by a publication list for FY 1975 (330 references) and a list of talks given outside the Laboratory (140 references). 29 figures. (auth)

  13. Lawrence Livermore National Laboratory FY 2016 Laboratory Directed Research and Development Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Al-Ayat, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gard, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sketchley, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Watkins, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-10-16

    The LDRD annual report for FY2016 consists of two parts: The Overview. This section contains a broad description of the LDRD Program, highlights of recent accomplishments and awards, Program statistics, and the LDRD portfolio-management processes. Project Reports. Project reports are submitted by all principal investigators at the end of the fiscal year. The length and depth of the report depends on the project’s lifecycle. For projects that will be continuing the following year, the principal investigator submits a continuing project report, which is a brief update containing descriptions of the goals, scope, motivation, relevance (to DOE/NNSA and Livermore mission areas), and technical progress achieved in FY16, as well as a list of selected publications and presentations that resulted from the research. For projects that concluded in FY16, a more detailed final report is provided that is technical in nature and includes the background, objectives, scientific approach, accomplishments, and impacts on the Laboratory missions, as well as a list of publications and presentations that resulted from the research. Project reports are listed under their research topics and organized by year and type, such as exploratory research (ER), feasibility study (FS), laboratory-wide competition (LW), and strategic initiative (SI). Each project is assigned a unique tracking code, an identifier that consists of three elements. The first is the fiscal year in which the project began, the second represents the project type, and the third identifies the serial number of the project for that fiscal year. For example, 16-ERD-100 means the project is an exploratory research project that began in FY16. The three-digit number (100) represents the serial number for the project.

  14. InterProScan Result: FY741994 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available FY741994 FY741994_2_ORF2 D0306AF64002633E PFAM PF00067 p450 7e-14 T IPR001128 Cytochrome P450 Molecular... Function: monooxygenase activity (GO:0004497)|Molecular Function: iron ion binding (GO:0005506)|Molecular... Function: electron carrier activity (GO:0009055)|Molecular Function: heme binding (GO:0020037) ...

  15. Optimization Of Chromaticity Compensation And Dynamic Aperture In MEIC Collider Rings

    International Nuclear Information System (INIS)

    Lin, Fanglei; Derbenev, Yaroslav; Morozov, Vasiliy; Zhang, Yuhong; Beard, Kevin

    2012-01-01

    The conceptual design of the Medium-energy Electron-Ion Collider (MEIC) at Jefferson Lab relies on an ultra-small beta-star to achieve high luminosities of up to 10 34 cm -2 s -1 . A low-beta insertion for interaction regions unavoidably induces large chromatic effects that demand a proper compensation. The present approach of chromatic compensation in the MEIC collider rings is based on a local correction scheme using two symmetric chromatic compensation blocks that includes families of sextupoles, and are placed in a beam extension area on both sides of a collision point. It can simultaneously compensate the first order chromaticity and chromatic beam smear at the IP without inducing significant second order aberrations. In this paper, we investigate both the momentum acceptance and dynamic aperture in the MEIC ion collider ring by considering the aberration effects up to the third order, such as amplitude dependent tune shift. We also explore the compensation of the third order effects by introducing families of octupoles in the extended beam area.

  16. Consolidation Process for FY 1997 Financial Statements for Other Defense Organizations

    National Research Council Canada - National Science Library

    1998-01-01

    ... to prepare consolidated financial statements for FY 1996 and each succeeding year. The DoD Consolidated Financial Statements for FY 1997 include financial statements for a reporting entity entitled "Other Defense Organizations...

  17. Optimal imaging for treaty verification FY2014 annual report

    International Nuclear Information System (INIS)

    Hilton, Nathan R.; Johnson, William C.; Brubaker, Erik M.; Kupinski, Matthew Alan; MacGahan, Christopher Jonathan

    2014-01-01

    FY2014 technical report of our project funded by DNN R&D that leverages advanced inference methods developed for medical and adaptive imaging to address arms control applications. We seek a method to acquire and analyze imaging data of declared treaty-accountable items without creating an image of those objects or otherwise storing or revealing any classified information. Such a method would avoid the use of classified-information barriers. We present our progress on FY2014 tasks defined in our life-cycle plan. We also describe some future work that is part of the continuation of this project in FY2015 and beyond as part of a venture that joins ours with a related PNNL project.

  18. Optimal imaging for treaty verification FY2014 annual report

    Energy Technology Data Exchange (ETDEWEB)

    Hilton, Nathan R. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Johnson, William C. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Brubaker, Erik M. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Kupinski, Matthew Alan [Univ. of Arizona, Tucson, AZ (United States); MacGahan, Christopher Jonathan [Univ. of Arizona, Tucson, AZ (United States)

    2014-10-01

    FY2014 technical report of our project funded by DNN R&D that leverages advanced inference methods developed for medical and adaptive imaging to address arms control applications. We seek a method to acquire and analyze imaging data of declared treaty-accountable items without creating an image of those objects or otherwise storing or revealing any classified information. Such a method would avoid the use of classified-information barriers. We present our progress on FY2014 tasks defined in our life-cycle plan. We also describe some future work that is part of the continuation of this project in FY2015 and beyond as part of a venture that joins ours with a related PNNL project.

  19. GNEP Material Transportation, Storage and Disposal Analysis FY-08 Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Halsey, W

    2009-01-15

    This report provides a summary for FY-2008 of activities, analyses and products from the Material Transportation, Storage and Disposal (M-TSD) sub-task of Systems Analysis within the Advanced Fuel Cycle Research & Development area of the Global Nuclear Energy Partnership. The objective of this work is to evaluate near-term material management requirements for initial GNEP facilities and activities, long-term requirements for large-scale GNEP technology deployment, and alternatives and paths forward to meet these needs. For FY-08, the work expanded to include the Integrated Waste Management Strategy as well as integration with the newly formed Waste Forms Campaign. The M-TSD team was expanded with the addition of support from Savannah River National Lab (SRNL) to the existing team of Lawrence Livermore National Lab (LLNL), Argonne National Lab (ANL), Idaho National Lab (INL), Sandia National Lab (SNL) and University of Nevada - Reno (UN-R). During the first half of the year, analysis was focused on providing supporting technical analysis and documentation to support anticipated high-level decisions on program direction. A number of analyses were conducted and reports prepared as program deliverables. This work is briefly summarized in this report. Analyses provided informally to other program efforts are included in this report to provide documentation. This year-end summary was planned primarily as a compilation of activities following the anticipated programmatic decisions. These decisions were deferred beyond the end of the year, and funds were reallocated in a number of areas, thus reducing the M-TSD activities. This report summarizes the miscellaneous 'ad-hoc' work conducted during the later part of the year, such as support to the draft Programmatic Environmental Impact Statement (PEIS), and support to other program studies. Major programmatic contributions from the M-TSD team during the year included: (1) Completion of the IWMS in March 2008 as the

  20. GNEP Material Transportation, Storage and Disposal Analysis FY-08 Summary Report

    International Nuclear Information System (INIS)

    Halsey, W.

    2009-01-01

    This report provides a summary for FY-2008 of activities, analyses and products from the Material Transportation, Storage and Disposal (M-TSD) sub-task of Systems Analysis within the Advanced Fuel Cycle Research and Development area of the Global Nuclear Energy Partnership. The objective of this work is to evaluate near-term material management requirements for initial GNEP facilities and activities, long-term requirements for large-scale GNEP technology deployment, and alternatives and paths forward to meet these needs. For FY-08, the work expanded to include the Integrated Waste Management Strategy as well as integration with the newly formed Waste Forms Campaign. The M-TSD team was expanded with the addition of support from Savannah River National Lab (SRNL) to the existing team of Lawrence Livermore National Lab (LLNL), Argonne National Lab (ANL), Idaho National Lab (INL), Sandia National Lab (SNL) and University of Nevada - Reno (UN-R). During the first half of the year, analysis was focused on providing supporting technical analysis and documentation to support anticipated high-level decisions on program direction. A number of analyses were conducted and reports prepared as program deliverables. This work is briefly summarized in this report. Analyses provided informally to other program efforts are included in this report to provide documentation. This year-end summary was planned primarily as a compilation of activities following the anticipated programmatic decisions. These decisions were deferred beyond the end of the year, and funds were reallocated in a number of areas, thus reducing the M-TSD activities. This report summarizes the miscellaneous 'ad-hoc' work conducted during the later part of the year, such as support to the draft Programmatic Environmental Impact Statement (PEIS), and support to other program studies. Major programmatic contributions from the M-TSD team during the year included: (1) Completion of the IWMS in March 2008 as the baseline

  1. Final Report to the National Energy Technology Laboratory on FY14- FY15 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    Energy Technology Data Exchange (ETDEWEB)

    Vittal, Vijay [Arizona State Univ., Tempe, AZ (United States); Lampis, Anna Rosa [Arizona State Univ., Tempe, AZ (United States)

    2018-01-16

    The Power System Engineering Research Center (PSERC) engages in technological, market, and policy research for an efficient, secure, resilient, adaptable, and economic U.S. electric power system. PSERC, as a founding partner of the Consortium for Electric Reliability Technology Solutions (CERTS), conducted a multi-year program of research for U.S. Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) to develop new methods, tools, and technologies to protect and enhance the reliability and efficiency of the U.S. electric power system as competitive electricity market structures evolve, and as the grid moves toward wide-scale use of decentralized generation (such as renewable energy sources) and demand-response programs. Phase I of OE’s funding for PSERC, under cooperative agreement DE-FC26-09NT43321, started in fiscal year (FY) 2009 and ended in FY2013. It was administered by DOE’s National Energy Technology Laboratory (NETL) through a cooperative agreement with Arizona State University (ASU). ASU provided sub-awards to the participating PSERC universities. This document is PSERC’s final report to NETL on the activities for OE, conducted through CERTS, from September 2015 through September 2017 utilizing FY 2014 to FY 2015 funding under cooperative agreement DE-OE0000670. PSERC is a thirteen-university consortium with over 30 industry members. Since 1996, PSERC has been engaged in research and education efforts with the mission of “empowering minds to engineer the future electric energy system.” Its work is focused on achieving: • An efficient, secure, resilient, adaptable, and economic electric power infrastructure serving society • A new generation of educated technical professionals in electric power • Knowledgeable decision-makers on critical energy policy issues • Sustained, quality university programs in electric power engineering. PSERC core research is funded by industry, with a budget supporting

  2. Department of Defense Strategic Sustainability Performance Plan FY 2012

    Science.gov (United States)

    2012-01-01

    interoperability of equipment; and the management and oversight of contingency basing. Improved contingency base sustainability will also enhance mission...with communicating classified information from alternate work locations. In FY 2011, NGA developed and began implementing a telecommuting policy...operating procedures. DLA Disposition Services strengthened its oversight of the electronics demanufacturing process in FY 2011 by tightening

  3. InterProScan Result: FY752086 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available FY752086 FY752086_4_ORF1 883389819CEEC6A6 PFAM PF00067 p450 2.3e-25 T IPR001128 Cytochrome P450 Molecular... Function: monooxygenase activity (GO:0004497)|Molecular Function: iron ion binding (GO:0005506)|Molecular... Function: electron carrier activity (GO:0009055)|Molecular Function: heme binding (GO:0020037) ...

  4. InterProScan Result: FY748470 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available FY748470 FY748470_1_ORF2 6597395FD817F217 PFAM PF00067 p450 1.3e-05 T IPR001128 Cytochrome P450 Molecular... Function: monooxygenase activity (GO:0004497)|Molecular Function: iron ion binding (GO:0005506)|Molecular... Function: electron carrier activity (GO:0009055)|Molecular Function: heme binding (GO:0020037) ...

  5. InterProScan Result: FY005565 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available FY005565 FY005565_1_ORF1 21201BC324E6CE7F PFAM PF00067 p450 6.2e-17 T IPR001128 Cytochrome P450 Molecular... Function: monooxygenase activity (GO:0004497)|Molecular Function: iron ion binding (GO:0005506)|Molecular... Function: electron carrier activity (GO:0009055)|Molecular Function: heme binding (GO:0020037) ...

  6. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  7. Decontamination and decommissioning activities photobriefing book FY 1998

    International Nuclear Information System (INIS)

    1999-01-01

    Fiscal Year (FY) 1998 was very successful in terms of Decontamination and Decommissioning (D and D) project completions. This photobriefing book highlights these projects and activities in one ongoing project. Brief descriptions of projects planned for the future are also provided. Two D and D projects funded by the US DOE Office of Environmental Management (EM-40) were completed safely and on schedule in FY 1998: (1) Argonne Thermal Source Reactor (ATSR) was a low-power research reactor that operated from 1950 to 1989; and (2) The Building 594 (a.k.a. 579) Waste Ion-Exchange Facility was an obsolete facility constructed in the 1950s to process waste fluids from a collecting lagoon. Field work at one project was ongoing during FY 1998: (1) Chicago Pile 5 (CP-5) was a 5-megawatt, heavy water-moderated, enriched uranium-fueled reactor used to produce neutrons for scientific research from 1954-79. The reactor was shut down and defueled in 1979. D and D is scheduled to be completed in FY 2000. Project experience has lent itself to developing unique staff capabilities. The D and D group was chosen as lead organization for a project supported with operating funds provided by Argonne's Plant Facilities and Services (PFS) Division. This project was also completed safely and on schedule in FY 1998: (1) The Building 200/205 Pneumatic Transfer Tube was constructed in the late 1960s between Hot Cell M-4 in Building 200 and a glove box in Room F-131, Building 205, and used to transfer irradiated fuel specimens and other samples between the two buildings

  8. Atmospheric Science Program. Summaries of research in FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report provides descriptions for all projects funded by ESD under annual contracts in FY 1994. Each description contains the project`s title; three-year funding history (in thousands of dollars); the contract period over which the funding applies; the name(s) of the principal investigator(s); the institution(s) conducting the projects; and the project`s objectives, products, approach, and results to date (for most projects older than one year). Project descriptions are categorized within the report according to program areas: atmospheric chemistry, atmospheric dynamics, and support operations. Within these categories, the descriptions are ordered alphabetically by principal investigator. Each program area is preceded by a brief text that defines the program area, states it goals and objectives, lists principal research questions, and identifies program managers. Appendixes provide the addresses and telephone numbers of the principal investigators and define the acronyms used.

  9. FY 2010 Public Libraries Survey

    Data.gov (United States)

    Institute of Museum and Library Services — Dig into FY 2010 data on public library systems (referred to as administrative entities in the Public Libraries Survey) and main libraries, branches, and bookmobiles...

  10. FY 2011 Public Libraries Survey

    Data.gov (United States)

    Institute of Museum and Library Services — Dig into FY 2011 data on public library systems (referred to as administrative entities in the Public Libraries Survey) and main libraries, branches, and bookmobiles...

  11. FY 2009 Public Libraries Survey

    Data.gov (United States)

    Institute of Museum and Library Services — Dig into FY 2009 data on public library systems (referred to as administrative entities in the Public Libraries Survey) and main libraries, branches, and bookmobiles...

  12. Documentation for the NCES Common Core of Data National Public Education Financial Survey (NPEFS), School Year 2008-09 (Fiscal Year 2009). Revised File Version 1b. NCES 2011-330rev

    Science.gov (United States)

    Cornman, Stephen Q.; Zhou, Lei; Nakamoto, Nanae

    2012-01-01

    This documentation is for the revised file (Version 1b) of the National Center for Education Statistics' (NCES) Common Core of Data (CCD) National Public Education Financial Survey (NPEFS) for school year 2008-2009, fiscal year 2009 (FY 09). It contains a brief description of the data collection along with information required to understand and…

  13. Hanford Diversification and the Tri-Cities Economy FY 1999

    Energy Technology Data Exchange (ETDEWEB)

    SCOTT, M.J.

    2000-06-05

    The missions of the U.S. Department of Energy's Richland Operations Office (DOE/RL) are to safely manage the Hanford Site, to manage and clean up its legacy wastes, and to develop and deploy new science and technology in the environmental and energy fields. Collectively, DOE/RL and its contractors are the most important single entity in the Tri-Cities local economy (Pasco, Kennewick, and Richland, Washington, and the surrounding area). Although the relevant economic region affected by DOE/RL and its contractors actually embraces a geographic area reaching from Yakima in the west to Walla Walla in the east and from Moses Lake in the north to Pendleton, Oregon, in the south, over 90% of economic impacts likely occur in Benton and Franklin Counties. These two counties are defined as the ''local'' Tri-Cities economy for purposes of this study. In the federal fiscal year (FY) 1999 (October 1, 1998 through September 30, 1999), the total impact of DOE'S local $1.59 billion budget was felt through payrolls of $542 million and local purchases of goods and services of $226 million. The total local spending of $768 million was up slightly from the FY 1998 total of $765 million. Taking into account the multiplier effects of this spending, the DOE/RL budget sustained an estimated 32% of all local employment (28,250 out of 88,100 jobs) and about 35% of local earned income (almost $1.08 billion out of $3.08 billion). The decrease in these percentages from last year's report reflects an update of the model's economic structure based on the 1997 economic census year, a correction of a programming error in the model found during the update, and a broader definition of earnings that includes proprietor income, not just wages (see the Appendix for revisions to the previous forecasts). DOE budget increases in FY 2000 are expected to result in no change to the number of local DOE contractor jobs and about a $29 million increase in direct local

  14. Defense Technology Objectives of the Joint Warfighting Science and Technology and Defense Technology Area Plan.

    Science.gov (United States)

    1996-05-01

    utilizing these agent impermeable membranes. By FY98, develop and conduct physiological testing of a series of microencapsulated phase change materials...bases and depots, as well as civilian areas. By the end of FY02, demonstrate efficacy of enzymatic decontamination system for G and V-type nerve agents

  15. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    International Nuclear Information System (INIS)

    1992-01-01

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail

  16. Library Systems: FY 1992-2012 Public Libraries Survey Trends (Administrative Entity)

    Data.gov (United States)

    Institute of Museum and Library Services — Find key information on trends in library systems around the United States from FY 1992 to FY 2012.These data include imputed values for libraries that did not...

  17. Inventory Accounts on the Financial Statements of the Defense Logistics Agency Business Areas of the Defense Business Operations Fund for FY 1993

    National Research Council Canada - National Science Library

    Young, Shelton

    1994-01-01

    The objectives of the audit were to: Determine whether the inventory accounts on the FY 1993 financial statement of the Fund are presented fairly in accordance with generally accepted accounting principles, Evaluate the internal control...

  18. Sludge Treatment and Extraction Technology Development: Results of FY 1993 studies

    International Nuclear Information System (INIS)

    Lumetta, G.J.; Wagner, M.J.; Barrington, R.J.; Rapko, B.M.; Carlson, C.D.

    1994-03-01

    This report describes experimental results from work conducted in FY 1993 under the Sludge Treatment and Extraction Technology Development Task of the Tank Waste Remediation System (TWRS) Pretreatment Technology Development Project at Pacific Northwest Laboratory (PNL). Experiments were conducted in the following six general areas: (1) sludge washing, (2) sludge leaching, (3) sludge dissolution, (4) actinide separation by solvent extraction and extraction chromatography, (5) Sr separation by solvent extraction, and (6) extraction of Cs from acidic solution

  19. Full on-chip and area-efficient CMOS LDO with zero to maximum load stability using adaptive frequency compensation

    International Nuclear Information System (INIS)

    Ma Haifeng; Zhou Feng

    2010-01-01

    A full on-chip and area-efficient low-dropout linear regulator (LDO) is presented. By using the proposed adaptive frequency compensation (AFC) technique, full on-chip integration is achieved without compromising the LDO's stability in the full output current range. Meanwhile, the use of a compact pass transistor (the compact pass transistor serves as the gain fast roll-off output stage in the AFC technique) has enabled the LDO to be very area-efficient. The proposed LDO is implemented in standard 0.35 μm CMOS technology and occupies an active area as small as 220 x 320 μm 2 , which is a reduction to 58% compared to state-of-the-art designs using technologies with the same feature size. Measurement results show that the LDO can deliver 0-60 mA output current with 54 μA quiescent current consumption and the regulated output voltage is 1.8 V with an input voltage range from 2 to 3.3 V. (semiconductor integrated circuits)

  20. Annual Status Report (FY2008) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [Hanford Site (HNF), Richland, WA (United States)

    2009-12-18

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE 0 435.1, Radioactive to be considered or purposes of Waste Management, and implemented by DOE/RL-2000-292, Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington, the DOE Richland Operations Office has prepared this annual report for fiscal year 2008 of PNNL-1 1800, Composite Analysis for the Low-Level Waste Disposal in the 200-Area Plateau of the Hanford Site, hereafter referred to as the Composite Analysis. The main emphasis of DOE/RL-2000-29 Is to identify additional data and information to enhance the Composite Analysis and the subsequent PNNL- 11800 Addendum, Addendum to Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site, hereafter referred to as the Addendum, and to address secondary issues identified during the review of the Composite Analysis.

  1. Manipulation of Nanoparticles Using Dark-Field-Illumination Optical Tweezers with Compensating Spherical Aberration

    International Nuclear Information System (INIS)

    Jin-Hua, Zhou; Run-Zhe, Tao; Zhi-Bin, Hu; Min-Cheng, Zhong; Zi-Qiang, Wang; Yin-Mei, Li; Jun, Cai

    2009-01-01

    Based on our previous investigation of optical tweezers with dark field illumination [Chin. Phys. Lett. 25(2008)329], nanoparticles at large trap depth are better viewed in wide field and real time for a long time, but with poor forces. Here we present the mismatched tube length to compensate for spherical aberration of an oil-immersion objective in a glass-water interface in an optical tweezers system for manipulating nanoparticles. In this way, the critical power of stable trapping particles is measured at different trap depths. It is found that trap depth is enlarged for trapping nanoparticles and trapping forces are enhanced at large trap depth. According to the measurement, 70-nm particles are manipulated in three dimensions and observed clearly at large appropriate depth. This will expand applications of optical tweezers in a nanometre-scale colloidal system. (cross-disciplinary physics and related areas of science and technology)

  2. FY09 recycling opportunity assessment for Sandia National Laboratories/New Mexico.

    Energy Technology Data Exchange (ETDEWEB)

    McCord, Samuel Adam

    2010-07-01

    This Recycling Opportunity Assessment (ROA) is a revision and expansion of the FY04 ROA. The original 16 materials are updated through FY08, and then 56 material streams are examined through FY09 with action items for ongoing improvement listed for most. In addition to expanding the list of solid waste materials examined, two new sections have been added to cover hazardous waste materials. Appendices include energy equivalencies of materials recycled, trends and recycle data, and summary tables of high, medium, and low priority action items.

  3. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    2000-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  4. Advanced Fuels Campaign FY 2011 Accomplishments Report

    Energy Technology Data Exchange (ETDEWEB)

    Not Listed

    2011-11-01

    One of the major research and development (R&D) areas under the Fuel Cycle Research and Development (FCRD) program is advanced fuels development. The Advanced Fuels Campaign (AFC) has the responsibility to develop advanced fuel technologies for the Department of Energy (DOE) using a science-based approach focusing on developing a microstructural understanding of nuclear fuels and materials. Accomplishments made during fiscal year (FY 20) 2011 are highlighted in this report, which focuses on completed work and results. The process details leading up to the results are not included; however, the technical contact is provided for each section. The order of the accomplishments in this report is consistent with the AFC work breakdown structure (WBS).

  5. 78 FR 56271 - FY 2014-2020 Draft VA Strategic Plan

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF VETERANS AFFAIRS FY 2014-2020 Draft VA Strategic Plan AGENCY: Department of Veterans... Affairs (VA) is announcing the availability of the FY 2014-2020 Draft VA Strategic Plan (Strategic Plan... Act of 2010 (GPRAMA) (Pub. L. 111-352). The Strategic Plan provides the Department's long-term...

  6. Argonne National Laboratory institutional plan FY 2002 - FY 2007

    International Nuclear Information System (INIS)

    Beggs, S. D.

    2001-01-01

    The national laboratory system provides a unique resource for addressing the national needs inherent in the mission of the Department of Energy. Argonne, which grew out of Enrico Fermi's pioneering work on the development of nuclear power, was the first national laboratory and, in many ways, has set the standard for those that followed. As the Laboratory's new director, I am pleased to present the Argonne National Laboratory Institutional Plan for FY 2002 through FY 2007 on behalf of the extraordinary group of scientists, engineers, technicians, administrators, and others who re responsible for the Laboratory's distinguished record of achievement. Like our sister DOE laboratories, Argonne uses a multifaceted approach to advance U.S. R and D priorities. First, we assemble interdisciplinary teams of scientists and engineers to address complex problems. For example, our initiative in Functional Genomics will bring together biologists, computer scientists, environmental scientists, and staff of the Advanced Photon Source to develop complete maps of cellular function. Second, we cultivate specific core competencies in science and technology; this Institutional Plan discusses the many ways in which our core competencies support DOE's four mission areas. Third, we serve the scientific community by designing, building, and operating world-class user facilities, such as the Advanced Photon Source, the Intense Pulsed Neutron Source, and the Argonne Tandem-Linac Accelerator System. This Plan summarizes the visions, missions, and strategic plans for the Laboratory's existing major user facilities, and it explains our approach to the planned Rare Isotope Accelerator. Fourth, we help develop the next generation of scientists and engineers through educational programs, many of which involve bright young people in research. This Plan summarizes our vision, objectives, and strategies in the education area, and it gives statistics on student and faculty participation. Finally, we

  7. Horonobe underground research program. Research report of 2002 FY investigation

    International Nuclear Information System (INIS)

    2003-06-01

    Main results of investigation about Horonobe deep underground research center in 2002 FY were reported. It consists of six chapters: introduction, main results, selection of research center area, underground science research, R and D of geological disposal, and the environmental survey and research center on the ground. The research center area at about 3 km north of Horonobe (B1) was selected in the four areas: A, B1, B2 and C on the basis of data, researches in the sky, aboveground and underground and other conditions. The model of geological environment was constructed by physical, geological, surface water supply researches. Development of geological environment monitoring techniques, investigation of long stabilization of geological environment and design of underground facilities are reported. The basic design of preparation of research center was investigated. (S.Y.)

  8. Health Insurance Costs and Employee Compensation: Evidence from the National Compensation Survey.

    Science.gov (United States)

    Anand, Priyanka

    2017-12-01

    This paper examines the relationship between rising health insurance costs and employee compensation. I estimate the extent to which total compensation decreases with a rise in health insurance costs and decompose these changes in compensation into adjustments in wages, non-health fringe benefits, and employee contributions to health insurance premiums. I examine this relationship using the National Compensation Survey, a panel dataset on compensation and health insurance for a sample of establishments across the USA. I find that total hourly compensation reduces by $0.52 for each dollar increase in health insurance costs. This reduction in total compensation is primarily in the form of higher employee premium contributions, and there is no evidence of a change in wages and non-health fringe benefits. These findings show that workers are absorbing at least part of the increase in health insurance costs through lower compensation and highlight the importance of examining total compensation, and not just wages, when examining the relationship between health insurance costs and employee compensation. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  9. Fiscal Year (FY) 2017 Activities for the Spent Fuel Nondestructive Assay Project

    Energy Technology Data Exchange (ETDEWEB)

    Trellue, Holly Renee [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Trahan, Alexis Chanel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); McMath, Garrett Earl [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Swinhoe, Martyn Thomas [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Hu, Jianwei [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Worrall, Andrew [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ilas, Germina [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Grogan, Brandon [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-11

    The main focus of research in the NA-241 spent fuel nondestructive assay (NDA) project in FY17 has been completing the fabrication and testing of two prototype instruments for upcoming spent fuel measurements at the Clab interim storage facility in Sweden. One is a passive instrument: Differential Die-away Self Interrogation-Passive Neutron Albedo Reactivity (DDSI), and one is an active instrument: Differential Die-Away-Californium Interrogation with Prompt Neutron (DDA). DDSI was fabricated and tested with fresh fuel at Los Alamos National Laboratory in FY15 and FY16, then shipped to Sweden at the beginning of FY17. Research was performed in FY17 to simplify results from the data acquisition system, which is complex because signals from 56 different 3He detectors must be processed using list mode data. The DDA instrument was fabricated at the end of FY16. New high count rate electronics better suited for a spent fuel environment (i.e., KM-200 preamplifiers) were built specifically for this instrument in FY17, and new Tygon tubing to house electrical cables was purchased and installed. Fresh fuel tests using the DDA instrument with numerous configurations of fuel rods containing depleted uranium (DU), low enriched uranium (LEU), and LEU with burnable poisons (Gd) were successfully performed and compared to simulations.1 Additionally, members of the spent fuel NDA project team travelled to Sweden for a “spent fuel characterization and decay heat” workshop involving simulations of spent fuel and analysis of uncertainties in decay heat calculations.

  10. 200-UP-1 Operable Unit borehole summary report for FY 1995

    International Nuclear Information System (INIS)

    Darrach, M.E.

    1996-07-01

    This report details the well construction, sampling, analyses, and geologic character of the Ringold Formation as it was encountered in five wells drilled in the 200-UP-1 Operable Unit during fiscal year (FY) 1995. The 200-UP-1 Interim Remedial Measure Drilling Description of Work was prepared to support the FY 95 field work and presented the specific field activities and procedural requirements to be implemented. The geology of the vadose zone is not described in the text of this report. Vadose zone geology in the immediate area is characterized in sufficient detail in existing documents. However, the borehole logs and well summary sheets provided in the appendices depict the vadose zone stratigraphy and well construction details. Sieve analyses conducted on sediments from the saturated zone were used to design the well completions; these analyses are included. Where applicable, inferences are made concerning the geologic character of the saturated interval. In addition, a synopsis of the preliminary well development process is outlined. Other related information is included with this report as supplemental data

  11. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of

  12. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  13. Oak Ridge National Laboratory institutional plan, FY 1992--FY 1997

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    In operation for fifty years, the Oak Ridge National Laboratory (ORNL) is managed by Martin Marietta Energy Systems, Inc., for the US Department of Energy (DOE). ORNL is one of DOE's major multiprogram national laboratories. Activities at the Laboratory are focused on basic and applied research, on technology development, and on other technological challenges that are important to DOE and to the nation. The Laboratory also performs research and development (R D) for non-DOE sponsors when such activities complement DOE missions and address important national or international issues. The Laboratory is committed to the pursuit of excellence in all its activities, including the commitment to carry out its missions in compliance with environmental, safety, and health laws and regulations. The principal elements of the Laboratory's missions in support of DOE include activities in each of the following areas: (1) Energy production and conservation technologies; (2) physical and life sciences; (3) scientific and technical user facilities; (4) environmental protection and waste management; (5) science technology transfer; and, (6) education. This institutional plan for ORNL activities is for the next five years: FY 1992--1997.

  14. NREL Photovoltaic Program FY 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    1997-08-01

    This report summarizes the in-house and subcontract research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaics (PV) Program from October 1, 1995 through September 30, 1996 (fiscal year [FY] 1996). The NREL PV Program is part of the U.S. Department of Energy's (DOE) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The mission of the DOE National Photovoltaics Program is to: "Work in partnership with U.S. industry to develop and deploy photovoltaic technology for generating economically competitive electric power, making photovoltaics an important contributor to the nation's and the world's energy use and environmental improvement. The two primary goals of the national program are to (1) maintain the U.S. PV industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NREL PV Program provides leadership and support to the national program toward achieving its mission and goals.

  15. Compensation in Flood Risk Management with a Focus on Shifts in Compensation Regimes Regarding Prevention, Mitigation and Disaster Management

    Directory of Open Access Journals (Sweden)

    Willemijn van Doorn-Hoekveld

    2014-05-01

    Full Text Available In the Netherlands, the history of water management and water safety especially, goes back centuries. Compensation of damage caused by lawful acts of an administrative body (no-fault liability is developed mostly in the field of water management and has quite a long history as well. The compensation of no-fault liability in the Netherlands since its introduction has been part of public law and not of civil law. This does not mean that the administration cannot be held liable for wrongful actions, in which case private law is applied. There is a strict distinction between wrongful and lawful acts of the administration: both can cause damage, but the way they are compensated differs: for lawful acts, public law is applied and for wrongful acts civil law (tort law is applied. This article only considers public law, because it is the most important branch of law for the compensation of damage caused in the field of water safety. The field of water safety and flood risk management has seen many new developments, of which integration is the latest one. However, the course of flood risk management tends towards more segmentation of responsibilities. No-fault liability and other questions of compensation are also areas that are developing towards more integration. Assessment of  no-fault liability in the field of water safety management cannot be made without taking into consideration the historical development of the responsibility of the state for water management tasks in general. In this contribution, the author addresses the historical development of responsibilities of the state for water management tasks, recent developments in this area and the system of no-fault liability regarding measures to prevent flooding.

  16. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.

  17. Agile machining and inspection thrust area team-on-machine probing / compatibility assessment of Parametric Technology Corporation (PTC) pro/CMM DMIS with Zeiss DMISEngine.

    Energy Technology Data Exchange (ETDEWEB)

    Wade, James Rokwel; Tomlinson, Kurt; Bryce, Edwin Anthony

    2008-09-01

    The charter goal of the Agile Machining and Inspection Thrust Area Team is to identify technical requirements, within the nuclear weapons complex (NWC), for Agile Machining and Inspection capabilities. During FY 2008, the team identified Parametric Technology Corporation (PTC) Pro/CMM as a software tool for use in off-line programming of probing routines--used for measurement--for machining and turning centers. The probing routine would be used for in-process verification of part geometry. The same Pro/CMM program used on the machine tool could also be employed for program validation / part verification using a coordinate measuring machine (CMM). Funding was provided to determine the compatibility of the Pro/CMM probing program with CMM software (Zeiss DMISEngine).

  18. 4th Quarter Transportation Report FY 2014: Radioactive Waste Shipments to and from the Nevada National Security Site (NNSS)

    International Nuclear Information System (INIS)

    Gregory, Louis

    2014-01-01

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to and from the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. There was one shipment of two drums sent for offsite treatment and disposal. This report summarizes the 4th quarter of Fiscal Year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014.

  19. Pacific Northwest National Laboratory Institutional Plan FY 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, Darrell R.; Pearson, Erik W.

    2000-12-29

    The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

  20. Pacific Northwest National Laboratory Institutional Plan FY 2000-2004

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, Erik W.

    2000-03-01

    The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

  1. An Analysis of the FY-1C, Iridium 33, and Cosmos 2251 Fragments

    Science.gov (United States)

    Liou, J.-C.

    2014-01-01

    The beginning of the year 2013 marks the sixth anniversary of the destruction of the Fengyun-1C (FY-1C) weather satellite as the result of an anti-satellite test conducted by China in January 2007 and the fourth anniversary of the accidental collision between Cosmos 2251 and the operational Iridium 33 in February 2009. These two events represent the worst satellite breakups in history. A total of 5579 fragments have been cataloged by the U.S. Space Surveillance Network (SSN), and almost 5000 of them were still in orbit in January 2013. In addition to these cataloged objects, hundreds of thousands (or more) of fragments down to the millimeter size regime were also generated during the breakups. These fragments are too small to be tracked by the SSN, but are large enough to be a safety concern for human space activities and robotic missions in low Earth orbit (LEO, the region below 2000 km altitude). Like their cataloged siblings, many of them remain in orbit today. These two breakup events dramatically changed the landscape of the orbital debris environment in LEO. The spatial density of the cataloged population in January 2013 is shown as the top blue curve. The combined FY-1C, Iridium 33, and Cosmos 2251 fragments (black curve) account for about 50 percent of the cataloged population below an altitude of 1000 km. They are also responsible for the concentrations at 770 km and 850 km, altitudes at which the collisions occurred. The effects of the FY-1C, Iridium 33, and Cosmos 2251 fragments will continue to be felt for decades to come. For example, approximately half of the generated FY-1C fragments will remain in orbit 20 years from now. In general, the Iridium 33 and Cosmos 2251 fragments will decay faster than the FY-1C fragments because of their lower altitudes. Of the Iridium 33 and Cosmos 2251 fragments, the former have much shorter orbital lifetimes than the latter, because lightweight composite materials were heavily used in the construction of the Iridium

  2. Compensation Services Advisor | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Job Summary The Compensation Services Advisor is accountable for the effective ... Coordinates the annual Performance Review and Assessment System ... by IDRC and the broader financial and social implications of working in Canada. ... in areas such as mortgages, credit and so on to individuals not accustomed to ...

  3. Design of capacity incentive and energy compensation for demand response programs

    Science.gov (United States)

    Liu, Zhoubin; Cui, Wenqi; Shen, Ran; Hu, Yishuang; Wu, Hui; Ye, Chengjin

    2018-02-01

    Variability and Uncertainties caused by renewable energy sources have called for large amount of balancing services. Demand side resources (DSRs) can be a good alternative of traditional generating units to provide balancing service. In the areas where the electricity market has not been fully established, e.g., China, DSRs can help balance the power system with incentive-based demand response programs. However, there is a lack of information about the interruption cost of consumers in these areas, making it hard to determine the rational amount of capacity incentive and energy compensation for the participants of demand response programs. This paper proposes an algorithm to calculate the amount of capacity incentive and energy compensation for demand response programs when there lacks the information about interruption cost. Available statistical information of interruption cost in referenced areas is selected as the referenced data. Interruption cost of the targeted area is converted from the referenced area by product per electricity consumption. On this basis, capacity incentive and energy compensation are obtained to minimize the payment to consumers. Moreover, the loss of consumers is guaranteed to be covered by the revenue they earned from load serving entities.

  4. KEK Engineering Department -activity report FY 2003

    International Nuclear Information System (INIS)

    2005-03-01

    This report includes all kinds of activities of the Engineering Department of KEK from 2002 to 2003 FY. There are fourteen chapters, which contain KEK Prize for engineering, KEK meeting of engineering technologies, Engineering Seminar, COACK (Component Oriented Advanced Control Kernel) for cooperation R and D project, Forum on engineering technologies from 1998 to 2003 FY, Engineering Department Symposium, service trainings, Engineering Department research study, English training, training for professional worker, training for technical expert, report on joint training for technical expert, training for middle school students, and the Engineering Department system and the main events from 1971 to 2003. (S.Y. )

  5. FY05 Targeted Technology Transfer to US Independents

    Energy Technology Data Exchange (ETDEWEB)

    Donald F. Duttlinger; E. Lance Cole

    2005-11-01

    , the PTTC from the start has captured and reported data that document the myriad ways its programs impact industry. Of 119 workshops in FY05 where repeat attendance was reported, 59 percent of attendees on average had attended a PTTC event previously, indicating that a majority felt they were receiving enough value to come back. It also is encouraging that, after 11 years, PTTC events continue to attract new people. The form used at workshops to get participants feedback asks for a ''yes'' or ''no'' response to the question: ''Have you used any new technologies based on knowledge gained through PTTC?'' With data now available from 611 workshops, 41 percent of respondents said, ''yes'', confirming that people are applying the information they receive at PTTC workshops. PTTC in FY04 asked RLO directors, oilfield service companies and producers in 11 areas with significant technological barriers to adding new reserves to estimate the ''PTTC Impact Factor''--that is, the percentage of the total reserves added in their areas that logically could be attributed to PTTC's efforts. Of the estimated 1,266 million barrels of oil equivalent (BOE) added in the 11 areas, participants estimated that roughly 88 million BOE had been added as a result of PTTC's techtransfer efforts. PTTC's 10 regions are the primary delivery mechanism for technology transfer. Attendance at PTTC regional activities set a record in FY05, with 8,900 individuals attending 154 workshops, lunch-and-learn events, or student training and internships. When appropriate, regional workshops incorporate R&D findings from DOE-funded projects. This year HQ began a ''Microhole Technology Integration'' Initiative with DOE to more clearly present their microhole program to producers. Often events are held cooperatively with other national organizations, regional producer associations and

  6. 'Compensation neurosis': a review of the literature.

    Science.gov (United States)

    Weighill, V E

    1983-01-01

    This review examines the literature on psychological reactions, often referred to as 'compensation neurosis', which occur after an accident and which are thought to be produced or maintained by a compensation claim. Theories and research are examined. The area is complicated and research so far is limited in scope and design. Few accident cases involve compensation claims and the incidence of psychological difficulties across the whole range of cases is unknown. Researchers have considered a number of background factors--severity of injury, pre-existing neurotic traits, social class, sex and age--but there has been little investigation of attitudinal, family, social and employment factors or of progress of the condition and follow-up after settlement. The review identifies a major research need for more adequate screening and sampling of cases and for more systematic investigation of personal and family factors.

  7. Assessment and Correction of on-Orbit Radiometric Calibration for FY-3 VIRR Thermal Infrared Channels

    Directory of Open Access Journals (Sweden)

    Na Xu

    2014-03-01

    Full Text Available FengYun-3 (FY-3 Visible Infrared Radiometer (VIRR, along with its predecessor, Multispectral Visible Infrared Scanning Radiometer (MVISR, onboard FY-1C&D have had continuous global observation more than 14 years. This data record is valuable for weather prediction, climate monitoring, and environment research. Data quality is vital for satellite data assimilations in Numerical Weather Prediction (NWP and quantitative remote sensing applications. In this paper, the accuracies of radiometric calibration for VIRR onboard FY-3A and FY-3B, in thermal infrared (TIR channels, are evaluated using the Low Earth Orbit (LEO-LEO simultaneous nadir overpass intercalibration method. Hyperspectral and high-quality observations from Infrared Atmosphere Sounding Instrument (IASI onboard METOP-A are used as reference. The biases of VIRR measurements with respect to IASI over one-and-a-half years indicate that the TIR calibration accuracy of FY-3B VIRR is better than that of FY-3A VIRR. The brightness temperature (BT measured by FY-3A/VIRR is cooler than that measured by IASI with monthly mean biases ranging from −2 K to −1 K for channel 4 and −1 K to 0.2 K for channel 5. Measurements from FY-3B/VIRR are more consistent with that from IASI, and the annual mean biases are 0.84 ± 0.16 K and −0.66 ± 0.18 K for channels 4 and 5, respectively. The BT biases of FY-3A/VIRR show scene temperature-dependence and seasonal variation, which are not found from FY-3B/VIRR BT biases. The temperature-dependent biases are shown to be attributed to the nonlinearity of detectors. New nonlinear correction coefficients of FY-3A/VIRR TIR channels are reevaluated using various collocation samples. Verification results indicate that the use of the new nonlinear correction can greatly correct the scene temperature-dependent and systematic biases.

  8. Institutional plan. FY 1997-2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The FY 1997-2002 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. Of particular significance this year is the role of computing sciences in supporting a broad range of research activities, at Berkeley Lab in particular and throughout the entire Department of Energy system in general. The Institutional Plan is a management report for integration with the Department of Energy`s mission and programs and is an element of Department of Energy`s strategic management planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives.

  9. 38 CFR 21.3023 - Nonduplication; pension, compensation, and dependency and indemnity compensation.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Nonduplication; pension, compensation, and dependency and indemnity compensation. 21.3023 Section 21.3023 Pensions, Bonuses, and... Nonduplication; pension, compensation, and dependency and indemnity compensation. (a) Child; age 18. A child who...

  10. Method and installation to produce compensators for radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Quast, U; Krause, K

    1978-05-11

    An irregular body surface in the radiation application area in therapeutic radiaction, e.g. in the head-throat region, leads to deviations of the dose homogeneity. To compensate for this, a lateral geometrically-corrected and radial absorption-corrected compensator made of Lipowitz metal (alloy 50% Bi, 26.7% Pb, 13.3% Sn and 10% Cd) is used. It exhibits higher absorption properties than tissue-equavalent materials. In order to produce the negative form for the compensator to be laterally reduced for divergence reasons, a device is used which scans the body section as well as leads a cutting device over a disc of finely porous polystyrene hard foam at the same time and forms to negative shape from its surface.

  11. Conceptual design study of Fusion Experimental Reactor (FY87FER)

    International Nuclear Information System (INIS)

    1988-05-01

    The design study of Fusion Experimental Reactor(FER) which has been proposed to be the next step fusion device has been conducted by JAERI Reactor System Laboratory since 1982 and by FER design team since 1984. This is the final report of the FER design team program and describes the results obtained in FY1987 (partially in FY1986) activities. The contents of this report consist of the reference design which is based on the guideline in FY1986 by the Subcomitees set up in Nuclear Fusion Council of Atomic Energy Commission of Japan, the Low-Physics-Risk reactor design for achieving physics mission more reliably and the system study of FER design candidates including above two designs. (author)

  12. 77 FR 5614 - Department of State FY11 Service Contract Inventory

    Science.gov (United States)

    2012-02-03

    ... DEPARTMENT OF STATE [Public Notice 7785] Department of State FY11 Service Contract Inventory... Contract Inventory. SUMMARY: The Department of State has publically released its Service Contract Inventory.../ . Section 743 of Division C of the FY 2010 Consolidated Appropriations Act, Public Law 111-117, requires...

  13. Topography-Dependent Motion Compensation: Application to UAVSAR Data

    Science.gov (United States)

    Jones, Cathleen E.; Hensley, Scott; Michel, Thierry

    2009-01-01

    The UAVSAR L-band synthetic aperture radar system has been designed for repeat track interferometry in support of Earth science applications that require high-precision measurements of small surface deformations over timescales from hours to years. Conventional motion compensation algorithms, which are based upon assumptions of a narrow beam and flat terrain, yield unacceptably large errors in areas with even moderate topographic relief, i.e., in most areas of interest. This often limits the ability to achieve sub-centimeter surface change detection over significant portions of an acquired scene. To reduce this source of error in the interferometric phase, we have implemented an advanced motion compensation algorithm that corrects for the scene topography and radar beam width. Here we discuss the algorithm used, its implementation in the UAVSAR data processor, and the improvement in interferometric phase and correlation achieved in areas with significant topographic relief.

  14. Oak Ridge TNS Program: summary of FY 1978 activities

    International Nuclear Information System (INIS)

    Steiner, D.; Becraft, W.R.; Brown, T.G.

    1979-07-01

    The Next Step (TNS) represents the stage of fusion energy development in which the major emphasis is on engineering testing and demonstration. In this document, the activities of the Oak Ridge TNS Program for FY 1978 are described and summarized. The Reference Design that has evolved from these activities is described, its operating characteristics are examined, and project planning issues are considered. Major conclusions from the FY 1978 effort are stated

  15. [Vestibular compensation studies]. [Vestibular Compensation and Morphological Studies

    Science.gov (United States)

    Perachio, Adrian A. (Principal Investigator)

    1996-01-01

    The following topics are reported: neurophysiological studies on MVN neurons during vestibular compensation; effects of spinal cord lesions on VNC neurons during compensation; a closed-loop vestibular compensation model for horizontally canal-related MVN neurons; spatiotemporal convergence in VNC neurons; contributions of irregularly firing vestibular afferents to linear and angular VOR's; application to flight studies; metabolic measures in vestibular neurons; immediate early gene expression following vestibular stimulation; morphological studies on primary afferents, central vestibular pathways, vestibular efferent projection to the vestibular end organs, and three-dimensional morphometry and imaging.

  16. Abiotic Degradation Rates for Carbon Tetrachloride and Chloroform: Progress in FY2009

    Energy Technology Data Exchange (ETDEWEB)

    Amonette, James E.; Jeffers, Peter M.; Qafoku, Odeta; Russell, Colleen K.; Wietsma, Thomas W.; Truex, Michael J.

    2010-03-31

    This report documents the progress made through FY 2009 on a project initiated in FY 2006 to help address uncertainties related to the rates of hydrolysis in groundwater for carbon tetrachloride (CT) and chloroform (CF). The study seeks also to explore the possible effects of contact with minerals and sediment (i.e., heterogeneous hydrolysis) on these rates. In previous years the work was funded as two separate projects by various sponsors, all of whom received their funding from the U.S. Department of Energy (DOE). In FY2009, the projects were combined and funded by CH2MHill Plateau Remediation Corporation (CHPRC). Work in FY2009 was performed by staff at the Pacific Northwest National Laboratory (PNNL). Staff from the State University of New York at Cortland (SUNY–Cortland) contributed in previous years.

  17. Nevada Test Site-Directed Research and Development, FY 2007 Report

    International Nuclear Information System (INIS)

    Wil Lewis, editor

    2008-01-01

    The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving from SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R and D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory (NWL

  18. Nevada Test Site-Directed Research and Development, FY 2007 Report

    Energy Technology Data Exchange (ETDEWEB)

    Wil Lewis, editor

    2008-02-20

    The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving from SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R&D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory

  19. Spatial transferring of ecosystem services and property rights allocation of ecological compensation

    Science.gov (United States)

    Wen, Wujun; Xu, Geng; Wang, Xingjie

    2011-09-01

    Ecological compensation is an important means to maintain the sustainability and stability of ecosystem services. The property rights analysis of ecosystem services is indispensable when we implement ecological compensation. In this paper, ecosystem services are evaluated via spatial transferring and property rights analysis. Take the Millennium Ecosystem Assessment (MA) as an example, we attempt to classify the spatial structure of 31 categories of ecosystem services into four dimensions, i.e., local, regional, national and global ones, and divide the property rights structure into three types, i.e., private property rights, common property rights and state-owned property rights. Through the case study of forestry, farming industry, drainage area, development of mineral resources, nature reserves, functional areas, agricultural land expropriation, and international cooperation on ecological compensation, the feasible ecological compensation mechanism is illustrated under the spatial structure and property rights structure of the concerned ecosystem services. For private property rights, the ecological compensation mode mainly depends on the market mechanism. If the initial common property rights are "hidden," the implementation of ecological compensation mainly relies on the quota market transactions and the state investment under the state-owned property rights, and the fairness of property rights is thereby guaranteed through central administration.

  20. Tanks Focus Area annual report FY2000

    International Nuclear Information System (INIS)

    2000-01-01

    The U.S. Department of Energy (DOE) continues to face a major radioactive waste tank remediation effort with tanks containing hazardous and radioactive waste resulting from the production of nuclear materials. With some 90 million gallons of waste in the form of solid, sludge, liquid, and gas stored in 287 tanks across the DOE complex, containing approximately 650 million curies, radioactive waste storage tank remediation is the nation's highest cleanup priority. Differing waste types and unique technical issues require specialized science and technology to achieve tank cleanup in an environmentally acceptable manner. Some of the waste has been stored for over 50 years in tanks that have exceeded their design lives. The challenge is to characterize and maintain these contents in a safe condition and continue to remediate and close each tank to minimize the risks of waste migration and exposure to workers, the public, and the environment. In 1994, the DOE's Office of Environmental Management (EM) created a group of integrated, multiorganizational teams focusing on specific areas of the EM cleanup mission. These teams have evolved into five focus areas managed within EM's Office of Science and Technology (OST): Tanks Focus Area (TFA); Deactivation and Decommissioning Focus Area; Nuclear Materials Focus Area; Subsurface Contaminants Focus Area; and Transuranic and Mixed Waste Focus Area

  1. PARAMETERS OF KAMCHATKA SEISMICITY IN 2008

    Directory of Open Access Journals (Sweden)

    Vadim A. Saltykov

    2010-01-01

    Full Text Available The paper describes seismicity of Kamchatka for the period of 2008 and presents 2D distribution of background seismicity parameters calculated from data published in the Regional Catalogue of Kamchatka Earthquakes. Parameters under study are total released seismic energy, seismic activity A10, slope of recurrence graph γ, parameters of RTL, ΔS and Z-function methods, and clustering of earthquakes. Estimations of seismicity are obtained for a region bordered by latitude 50.5–56.5N, longitude 156E–167E, with depths to 300 km. Earthquakes of energy classes not less than 8.5 as per the Fedotov’s classification are considered. The total seismic energy released in 2008 is estimated. According to a function of annual seismic energy distribution, an amount of seismic energy released in 2008 was close to the median level (Fig. 1. Over 2/3 of the total amount of seismic energy released in 2008 resulted from three largest earthquakes (МW ≥ 5.9. About 5 percent of the total number of seismic events are comprised of grouped earthquakes, i.e. aftershocks and swarms. A schematic map of the largest earthquakes (МW ≥ 5.9 and grouped seismic events which occurred in 2008 is given in Fig. 2; their parameters are listed in Table 1. Grouped earthquakes are excluded from the catalogue. A map showing epicenters of independent earthquakes is given in Fig. 3. The slope of recurrence graph γ and seismic activity A10 is based on the Gutenberg-Richter law stating the fundamental property of seismic process. The recurrence graph slope is calculated from continuous exponential distribution of earthquakes by energy classes. Using γ is conditioned by observations that in some cases the slope of the recurrence graph decreases prior to a large earthquake. Activity A10 is calculated from the number of earthquakes N and recurrence graph slope γ. Average slopes of recurrence graph γ and seismic activity A10 for the area under study in 2008 are calculated; our

  2. Communication dated 26 September 2008, copied to the Agency by the Permanent Mission of India regarding the Middle East and South Asia area

    International Nuclear Information System (INIS)

    2008-01-01

    The Secretariat has received a copy of a communication dated 26 September 2008 from the Permanent Mission of India to the Permanent Mission of Kazakhstan regarding the Middle East and South Asia Area. As requested by the Resident Representative of India to the Agency, during the meeting of the Board of Governors on 6 October 2008, the communication is herewith circulated for information

  3. Analyses in Support of Z-IFE LLNL Progress Report for FY-05

    International Nuclear Information System (INIS)

    Moir, R W; Abbott, R P; Callahan, D A; Latkowski, J F; Meier, W R; Reyes, S

    2005-01-01

    The FY04 LLNL study of Z-IFE [1] proposed and evaluated a design that deviated from SNL's previous baseline design. The FY04 study included analyses of shock mitigation, stress in the first wall, neutronics and systems studies. In FY05, the subject of this report, we build on our work and the theme of last year. Our emphasis continues to be on alternatives that hold promise of considerable improvements in design and economics compared to the base-line design. Our key results are summarized here

  4. Quarterly report on program cost and schedule: Fourth quarter FY 1988

    International Nuclear Information System (INIS)

    1988-01-01

    Major program milestones completed in the fourth quarter of FY 1988 include completed preliminary draft NWPAA Section 175 Impacts Report, completed Title I ESF design, completed site reclamation in Texas, distributed review draft of the Dry Cask Storage Study, completed draft and final FY 1990 OMB budget, issued FY 1987 Annual Report to Congress, issued four draft Environmental Field Activity Plans, issued draft Environmental Program Overview, and made grant payments to local governments under Section 116 of NWPA, as amended. Major accomplishments during the fourth quarter of FY 1988 are listed. The Water Appropriation Permit Application was filed with the Nevada State Engineer on July 21, 1988. Installation and checkout of the Prototype Engineered Barrier Test equipment in G-tunnel is continuing with an expected early September test initiation data. The Configuration Management Plan was sent to DOE/HQ for approval. The prototype facility for testing the horizontal waste package emplacement configuration was completed in the G-tunnel

  5. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  6. Tanks Focus Area annual report FY2000

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-12-01

    The U.S. Department of Energy (DOE) continues to face a major radioactive waste tank remediation effort with tanks containing hazardous and radioactive waste resulting from the production of nuclear materials. With some 90 million gallons of waste in the form of solid, sludge, liquid, and gas stored in 287 tanks across the DOE complex, containing approximately 650 million curies, radioactive waste storage tank remediation is the nation's highest cleanup priority. Differing waste types and unique technical issues require specialized science and technology to achieve tank cleanup in an environmentally acceptable manner. Some of the waste has been stored for over 50 years in tanks that have exceeded their design lives. The challenge is to characterize and maintain these contents in a safe condition and continue to remediate and close each tank to minimize the risks of waste migration and exposure to workers, the public, and the environment. In 1994, the DOE's Office of Environmental Management (EM) created a group of integrated, multiorganizational teams focusing on specific areas of the EM cleanup mission. These teams have evolved into five focus areas managed within EM's Office of Science and Technology (OST): Tanks Focus Area (TFA); Deactivation and Decommissioning Focus Area; Nuclear Materials Focus Area; Subsurface Contaminants Focus Area; and Transuranic and Mixed Waste Focus Area.

  7. Integrated disposal Facility Sagebrush Habitat Mitigation Project: FY2007 Compensation Area Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2007-09-01

    This report summarizes the first year survival of sagebrush seedlings planted as compensatory mitigation for the Integrated Disposal Facility Project. Approximately 42,600 bare root seedlings and 26,000 pluglings were planted at a mitigation site along Army Loop Road in February 2007. Initial baseline monitoring occurred in March 2007, and first summer survival was assessed in September 2007. Overall survival was 19%, with bare root survival being marginally better than pluglings (21% versus 14%). Likely major factors contributing to low survival were late season planting and insufficient soil moisture during seedling establishment.

  8. Fusion Reactor Safety Research program. Annual report, FY-80

    International Nuclear Information System (INIS)

    Crocker, J.G.; Cohen, S.

    1981-06-01

    The report is in three sections. Outside contracts includes a report of newly-started study at the General Atomic Company to consider safety implications of low-activation materials, portions of two papers from ongoing work at PNL and ANL, reports of the lithium spill work at HEDL, the LITFIRE code development at MIT, and risk assessment at MIT, all of which are an expansion of FY-79 outside contracts. EG and G Activities includes adaptations of four papers of ongoing work in transient code development, tritium system risk assessment, heat transfer and fluid flow analysis, and fusion safety data base. Program Plan Development includes the Executive Summary of the Plan, which was completed in FY-80, and is accompanied by a list of publications and a brief outline of proposed FY-81 activities to be based on the Program Plan

  9. Full on-chip and area-efficient CMOS LDO with zero to maximum load stability using adaptive frequency compensation

    Energy Technology Data Exchange (ETDEWEB)

    Ma Haifeng; Zhou Feng, E-mail: fengzhou@fudan.edu.c [State Key Laboratory of ASIC and System, Fudan University, Shanghai 201203 (China)

    2010-01-15

    A full on-chip and area-efficient low-dropout linear regulator (LDO) is presented. By using the proposed adaptive frequency compensation (AFC) technique, full on-chip integration is achieved without compromising the LDO's stability in the full output current range. Meanwhile, the use of a compact pass transistor (the compact pass transistor serves as the gain fast roll-off output stage in the AFC technique) has enabled the LDO to be very area-efficient. The proposed LDO is implemented in standard 0.35 {mu}m CMOS technology and occupies an active area as small as 220 x 320 {mu}m{sup 2}, which is a reduction to 58% compared to state-of-the-art designs using technologies with the same feature size. Measurement results show that the LDO can deliver 0-60 mA output current with 54 {mu}A quiescent current consumption and the regulated output voltage is 1.8 V with an input voltage range from 2 to 3.3 V. (semiconductor integrated circuits)

  10. Minimizing predatory lending: Designing a long-term compensation structure to minimize the actions of opportunistic mortgage brokers

    Directory of Open Access Journals (Sweden)

    Patrick Payne

    2013-07-01

    Full Text Available This paper addresses the inadequacies in the current compensation structure for mortgage brokers, and asserts that the resulting opportunistic behavior by brokers played a major role in the 2008 collapse of the mortgage market. We utilize agency theory as an underpinning to suggest that increased regulation will have only a limited impact on self-serving behavior due to the complex information asymmetries possessed by brokers. We posit that a restructured long-term compensation package would be effective in aligning the interests of borrowers and brokers, ultimately reducing the level of mortgage defaults and foreclosures.

  11. Protected areas and territorial exclusion of traditional communities: analyzing the social impacts of environmental compensation strategies in Brazil

    Directory of Open Access Journals (Sweden)

    Felisa C. Anaya

    2018-03-01

    Full Text Available The creation of the protected areas (PAs of restricted use dominates conservation policies throughout the world and reflects the western idea of separation between pristine nature and human-modified habitats. However, this conservation strategy has caused the proliferation of environmental conflicts involving territorial rights of traditional peoples and local communities throughout the world. Our study aims to analyze the impacts of the creation of a system of PAs of restricted use on the livelihoods and well-being of traditional communities in the north of Minas Gerais State, in Brazil. We analyzed the conflicts emerging in the study region from the perspective of the environmental justice paradigm. We used the extended-case method, conducting fieldwork to observe and register the movements of social resistance of traditional communities, and interviews with key stakeholders. Between 1970-1990, the Jaíba irrigation project was implemented in the north of Minas Gerais and, to compensate for the huge environmental impact of the project, several PAs of restricted use were created, disregarding the traditional peoples that inhabited the region. As a consequence, these populations were expelled from their territories without compensation or resettlement, causing severe restrictions to their traditional livelihoods and well-being, including access to natural resources such as water, fisheries and timber, and nontimber products, jeopardizing their food security, cultural identity, and social integrity. They initiated the "Movement of the People Cornered by Parks," lately evolving to "Vazanteiros in Movement," incorporating elements of the environmental arena to politically dispute alternative conservation projects. Sustainable development policies that incorporate the "economy of repair," expressed as environmental compensation strategies, are intrinsically contradictory and inappropriate from the perspective of environmental justice. Inclusive

  12. Supply and demand outlook for Japan's economic and energy up to FY2018

    International Nuclear Information System (INIS)

    Aoshima, Momoko; Yorita, Yasuo; Tsunoda, Miyuki

    2017-01-01

    Japan's economy has gradually expanded, with real GDP in the first quarter of 2017 becoming positive growth for five consecutive quarters for the first time since 2005 to 2006. Although the uncertain factors are increasing both in terms of politics and economy, the world economy is also growing moderately. As the main premises in the standard scenario, the following are supposed: (1) world economy grows moderately, with worldwide growth rate reaching 3.0% in FY2017 and 3.3% in FY2018, (2) exchange rate is about ¥115/$ in both FY2017 and FY2018 average, (3) as for nuclear power generation, cumulative restarted unit number reaches 10 basis until the end of FY2018, with average months of operation in FY2018 reaching 9 months, and with power generation amount reaching 65.6 billion kWh (7% of the power supply composition ratio), and (4) as for the supply and demand for power, the supply reserve ratio of 3% necessary for stable electric power supply can be secured nationwide. Thus, the supply and demand outlook for Japan's economic and energy up to FY2018 was made. The following various evaluation analyses were carried out: (1) macro economy, (2) production activities, (3) primary energy domestic supply, (4) final energy consumption, (5) electricity sales volume and power supply composition (electric power companies), (6) city gas sales volume (gas companies), fuel oil and LPG sales volume and crude oil throughput, and (7) in-depth analysis; demand trend of light oil, renewable energy power generation, and effects of restart of nuclear power plants. (A.O.)

  13. Electric Service Areas, Electric Servic Area - given to us from GA power and Planters Electric - distributed by the EMA Director, Val Ashcraft, Published in 2008, 1:2400 (1in=200ft) scale, Effingham County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Electric Service Areas dataset current as of 2008. Electric Servic Area - given to us from GA power and Planters Electric - distributed by the EMA Director, Val...

  14. Multifamily Hubs' Initial Endorsements FY12

    Data.gov (United States)

    Department of Housing and Urban Development — Describes the program, geographic & lender distribution of multifamily loans initially endorsed for FHA insurance or risk sharing in FY 12. A loan is initially...

  15. FY1 doctors' ethicolegal challenges in their first year of clinical practice: an interview study.

    Science.gov (United States)

    Vivekananda-Schmidt, Pirashanthie; Vernon, Bryan

    2014-04-01

    There is little evidence of junior trainee perspectives in the design and implementation of medical ethics and law (MEL) curriculum in UK medical schools. To determine the ethical issues the foundation year 1 (FY1) doctors (first year after graduation)  encountered during clinical practice and the skills and knowledge of MEL, which were useful in informing MEL curriculum development. The National Research Ethics Service gave ethical approval. Eighteen one-to-one interviews were conducted in each school with FY1 doctors. Interviews were recorded and transcribed verbatim; a thematic analysis was undertaken with the transcriptions and saturation of themes was achieved. Themes closely overlapped between the two study sites. (1) Knowing my place as an FY1 (this theme consisted of four subthemes: challenging the hierarchy, being honest when the team is titrating the truth, taking consent for unfamiliar procedures and personal safety vs competing considerations); (2) Do not attempt resuscitation)/end-of-life pathway and its implications; (3) 'You have to be there' (contextualising ethics and law teaching through cases or role plays to allow students to explore future work situations); and (4) advanced interpersonal skills competency for ethical clinical practice. The data provide a snapshot of the real challenges faced by MEL FY1 doctors in early clinical practice: they may feel ill-prepared and sometimes unsupported by senior members of the team. The key themes suggest areas for development of undergraduate and postgraduate MEL curricula. We will work to develop our own curriculum accordingly. We intend to further investigate the applicability of our findings to UK medical ethics and law curriculum.

  16. 77 FR 33773 - Announcement Regarding States Triggering “On” or “Off” in the Emergency Unemployment Compensation...

    Science.gov (United States)

    2012-06-07

    ... Triggering ``On'' or ``Off'' in the Emergency Unemployment Compensation 2008 (EUC08) Program and the Federal...: Notice. SUMMARY: Announcement regarding states triggering ``on'' or ``off'' in the Emergency Unemployment... unemployment rate be at least 110% of one of the rates from a comparable prior period in one of the three prior...

  17. Tanks focus area multiyear program plan FY97-FY99

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department of Energy (DOE) continues to face a major tank remediation problem with approximately 332 tanks storing over 378,000 ml of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Most of the tanks have significantly exceeded their life spans. Approximately 90 tanks across the DOE complex are known or assumed to have leaked. Some of the tank contents are potentially explosive. These tanks must be remediated and made safe. How- ever, regulatory drivers are more ambitious than baseline technologies and budgets will support. Therefore, the Tanks Focus Area (TFA) began operation in October 1994. The focus area manages, coordinates, and leverages technology development to provide integrated solutions to remediate problems that will accelerate safe and cost-effective cleanup and closure of DOE's national tank system. The TFA is responsible for technology development to support DOE's four major tank sites: Hanford Site (Washington), INEL (Idaho), Oak Ridge Reservation (ORR) (Tennessee), and Savannah River Site (SRS) (South Carolina). Its technical scope covers the major functions that comprise a complete tank remediation system: safety, characterization, retrieval, pretreatment, immobilization, and closure

  18. The Seismic Category I Structures Program results for FY 1987

    International Nuclear Information System (INIS)

    Farrar, C.R.; Bennett, J.G.; Dunwoody, W.E.; Baker, W.E.

    1990-10-01

    The accomplishments of the Seismic Category I Structures Program for FY 1987 are summarized. These accomplishments include the quasi-static load cycle testing of large shear wall elements, an extensive analysis of previous data to determine if equivalent linear analytical models can predict the response of damaged shear wall structures, and code committee activities. In addition, previous testing and results that led to the FY 1987 program plan are discussed and all previous data relating to shear wall stiffness are summarized. Because separate reports have already summarized the experimental and analytical work in FY 1987, this report will briefly highlight this work and the appropriate reports will be references for a more detailed discussion. 12 refs., 23 figs., 18 tabs

  19. Laboratory Directed Research and Development Program FY 2006 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Sjoreen, Terrence P [ORNL

    2007-04-01

    The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the US Departmental of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, 'Laboratory Directed Research and Development' (April 19, 2006), which establishes DOE's requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2006. The associated FY 2006 ORNL LDRD Self-Assessment (ORNL/PPA-2007/2) provides financial data about the FY 2006 projects and an internal evaluation of the program's management process.

  20. FY 1987 program summary document: Office of Defense Waste and Transportation Management

    International Nuclear Information System (INIS)

    1987-04-01

    This document describes the Office of Defense Waste and Transportation Management (DWTM) Program as supported by the President's Fiscal Year (FY) 1987 Budget Request to Congress. It specifically addresses the program's organization, objectives, strategies, and plans for FY 1987

  1. Laboratory technology research: Abstracts of FY 1998 projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    The Laboratory Technology Research (LTR) program supports high-risk, multidisciplinary research partnerships to investigate challenging scientific problems whose solutions have promising commercial potential. These partnerships capitalize on two great strengths of the country: the world-class basic research capability of the DOE Office of Science (SC) national laboratories and the unparalleled entrepreneurial spirit of American industry. Projects supported by the LTR program in FY 1998 explore the applications of basic research advances relevant to DOE`s mission over a full range of scientific disciplines. The program presently emphasizes three critical areas of mission-related research: advanced materials, intelligent processing and manufacturing research, and environmental and biomedical research. Abstracts for 85 projects are contained in this report.

  2. 76 FR 5567 - Service Contract Inventory for Fiscal Year (FY) 2010

    Science.gov (United States)

    2011-02-01

    ... DEPARTMENT OF EDUCATION Service Contract Inventory for Fiscal Year (FY) 2010 AGENCY: Office of the Chief Financial Officer, U.S. Department of Education. ACTION: Notice of availability--FY 2010 Service.... Skelly, Chief Financial Officer. [FR Doc. 2011-2236 Filed 1-28-11; 11:15 am] BILLING CODE 4000-01-P ...

  3. 78 FR 10611 - Service Contract Inventory for Fiscal Year (FY) 2012

    Science.gov (United States)

    2013-02-14

    ... DEPARTMENT OF EDUCATION Service Contract Inventory for Fiscal Year (FY) 2012 AGENCY: Office of the Chief Financial Officer, U.S. Department of Education. ACTION: Notice of availability--FY 2012 service... Deputy Chief Financial Officer. [FR Doc. 2013-03441 Filed 2-13-13; 8:45 am] BILLING CODE 4000-01-P ...

  4. 2008 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    C. T. Lindsey; K. A. Gano

    2008-09-30

    The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act cleanup of National Priorities List waste sites at Hanford. This report documents the results of revegetation and mitigation monitoring conducted in 2008 and includes 22 revegetation/restoration projects, one revegetation/mitigation project, and two bat habitat mitigation projects.

  5. Prelaunch calibrations and on-orbit performance analysis of FY-2D SVISSR infrared channels

    Science.gov (United States)

    Zhang, Yong; Chen, Fuchun

    2014-10-01

    Meteorological satellites have become an irreplaceable weather and ocean-observing tool in China. These satellites are used to monitor natural disasters and improve the efficiency of many sectors of Chinese national economy. FY-2 series satellites are one of the key components of Chinese meteorological observing system and application system. In this paper, the operational satellite- FY-2D's infrared channels were focused and analyzed. The instruments' background was introduced briefly. The main payload SVISSR specifications were compared with its ancestral VISSR. The optical structure of the SVISSR was also expressed. FY-2D prelaunch calibrations methodology was introduced and the accuracies of the absolute radiometric calibration were analyzed. Some key optics on-orbit performance of FY-2D SVISSR were analyzed include onboard blackbody, cold FPA and detector noise level. All of these works show that FY- 2D's main payload SVISSR was in a healthy status.

  6. FY16 LLNL Omega Experimental Programs

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ali, S. J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Benstead, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Celliers, P. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Coppari, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Eggert, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Erskine, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Panella, A. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fratanduono, D. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hua, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Huntington, C. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jarrott, L. C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jiang, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kraus, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lazicki, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); LePape, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Martinez, D. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McNaney, J. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Millot, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Moody, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pak, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Park, H. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ping, Y. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pollock, B. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rinderknecht, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ross, J. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rubery, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sio, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Smith, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Swadling, G. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wehrenberg, C. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Collins, G. W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Landen, O. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wan, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hsing, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-12-01

    In FY16, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall, these LLNL programs led 430 target shots in FY16, with 304 shots using just the OMEGA laser system, and 126 shots using just the EP laser system. Approximately 21% of the total number of shots (77 OMEGA shots and 14 EP shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 79% (227 OMEGA shots and 112 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports. In addition to these experiments, LLNL Principal Investigators led a variety of Laboratory Basic Science campaigns using OMEGA and EP, including 81 target shots using just OMEGA and 42 shots using just EP. The highlights of these are also summarized, following the ICF and HED campaigns. Overall, LLNL PIs led a total of 553 shots at LLE in FY 2016. In addition, LLNL PIs also supported 57 NLUF shots on Omega and 31 NLUF shots on EP, in collaboration with the academic community.

  7. FY16 LLNL Omega Experimental Programs

    International Nuclear Information System (INIS)

    Heeter, R. F.; Ali, S. J.; Benstead, J.; Celliers, P. M.; Coppari, F.; Eggert, J.; Erskine, D.; Panella, A. F.; Fratanduono, D. E.; Hua, R.; Huntington, C. M.; Jarrott, L. C.; Jiang, S.; Kraus, R. G.; Lazicki, A. E.; LePape, S.; Martinez, D. A.; McNaney, J. M.; Millot, M. A.; Moody, J.; Pak, A. E.; Park, H. S.; Ping, Y.; Pollock, B. B.; Rinderknecht, H.; Ross, J. S.; Rubery, M.; Sio, H.; Smith, R. F.; Swadling, G. F.; Wehrenberg, C. E.; Collins, G. W.; Landen, O. L.; Wan, A.; Hsing, W.

    2016-01-01

    In FY16, LLNL's High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall, these LLNL programs led 430 target shots in FY16, with 304 shots using just the OMEGA laser system, and 126 shots using just the EP laser system. Approximately 21% of the total number of shots (77 OMEGA shots and 14 EP shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 79% (227 OMEGA shots and 112 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports. In addition to these experiments, LLNL Principal Investigators led a variety of Laboratory Basic Science campaigns using OMEGA and EP, including 81 target shots using just OMEGA and 42 shots using just EP. The highlights of these are also summarized, following the ICF and HED campaigns. Overall, LLNL PIs led a total of 553 shots at LLE in FY 2016. In addition, LLNL PIs also supported 57 NLUF shots on Omega and 31 NLUF shots on EP, in collaboration with the academic community.

  8. Re-Planning for Compensator-Based IMRT with Original Compensators

    International Nuclear Information System (INIS)

    Zhang, Geoffrey; Feygelman, Vladimir; Stevens, Craig; Li Weiqi; Leuthold, Susan; Springett, Gregory; Hoffe, Sarah

    2011-01-01

    Compared with multileaf collimator (MLC)-based intensity-modulated radiotherapy (IMRT) for moving targets, compensator-based IMRT has advantages such as shorter beam-on time, fewer monitor units with potentially decreased secondary carcinogenesis risk, better optimization-to-deliverable dose conversion, and often better dose conformity. Some of the disadvantages include additional time for the compensators to be built and delivered, as well as extra cost. Patients undergoing treatment of abdominal cancers often experience weight loss. It would be necessary to account for this change in weight with a new plan and a second set of compensators. However, this would result in treatment delays and added costs. We have developed a method to re-plan the patient using the same set of compensators. Because the weight changes seen with the treatment of abdominal cancers are usually relatively small, a new 4D computed tomography (CT) acquired in the treatment position with markers on the original isocenter tattoos can be registered to the original planning scan. The contours of target volumes from the original scans are copied to the new scan after fusion. The original compensator set can be used together with a few field-in-field (FiF) beams defined by the MLC (or beams with cerrobend blocks for accelerators not equipped with a MLC). The weights of the beams with compensators are reduced so that the FiF or blocked beams can be optimized to mirror the original plan and dose distribution. Seven abdominal cancer cases are presented using this technique. The new plan on the new planning CT images usually has the same dosimetric quality as the original. The target coverage and dose uniformity are improved compared with the plan without FiF/block modification. Techniques combining additional FiF or blocked beams with the original compensators optimize the treatment plans when patients lose weight and save time and cost compared with generating plans with a new set of compensators.

  9. Institutional research and development, FY 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The Laboratory's Institutional Research and Development (IR and D) Program was established in 1984 to foster exploratory work to advance science and technology, disciplinary research to develop innovative solutions to support our national defense and energy missions. In FY 1988, the IR and D Program was funded by a 2% assessment on the Laboratory's operating budget. Our policy is to use these funds for researching innovative ideas in LLNL's areas of expertise and for developing new areas of expertise that we perceive to be in the national interest. The technical and scientific accomplishments of each project and of each institute funded this year are presented in this report. The projects were selected because they are expected to advance research in important areas that are too basic or too time consuming to be funded by the developmental programs or because they are somewhat risky projects that have the promise of high payoff. We are continually reappraising the IR and D Program. In particular, we seek new candidates for the Director's Initiatives, and we constantly reassess the work in progress. Each year, we make adjustments to further the Laboratory's policy of using the IR and D Program to fund innovative ideas with high potential for enhancing programmatic activities of national importance

  10. LANL FY11 activities(u)

    Energy Technology Data Exchange (ETDEWEB)

    Aragon, Ezekiel D [Los Alamos National Laboratory

    2011-01-06

    Briefings presenting W78 programmatic activities for FY11 and the status and plan for associated Hydro 3617, is included wherewith in support of the NNSA W78 Program Review Meetings scheduled for January 11 thru 13, 2011, at the Savannah River Plant, SC.

  11. Comparison of cloud top heights derived from FY-2 meteorological satellites with heights derived from ground-based millimeter wavelength cloud radar

    Science.gov (United States)

    Wang, Zhe; Wang, Zhenhui; Cao, Xiaozhong; Tao, Fa

    2018-01-01

    Clouds are currently observed by both ground-based and satellite remote sensing techniques. Each technique has its own strengths and weaknesses depending on the observation method, instrument performance and the methods used for retrieval. It is important to study synergistic cloud measurements to improve the reliability of the observations and to verify the different techniques. The FY-2 geostationary orbiting meteorological satellites continuously observe the sky over China. Their cloud top temperature product can be processed to retrieve the cloud top height (CTH). The ground-based millimeter wavelength cloud radar can acquire information about the vertical structure of clouds-such as the cloud base height (CBH), CTH and the cloud thickness-and can continuously monitor changes in the vertical profiles of clouds. The CTHs were retrieved using both cloud top temperature data from the FY-2 satellites and the cloud radar reflectivity data for the same time period (June 2015 to May 2016) and the resulting datasets were compared in order to evaluate the accuracy of CTH retrievals using FY-2 satellites. The results show that the concordance rate of cloud detection between the two datasets was 78.1%. Higher consistencies were obtained for thicker clouds with larger echo intensity and for more continuous clouds. The average difference in the CTH between the two techniques was 1.46 km. The difference in CTH between low- and mid-level clouds was less than that for high-level clouds. An attenuation threshold of the cloud radar for rainfall was 0.2 mm/min; a rainfall intensity below this threshold had no effect on the CTH. The satellite CTH can be used to compensate for the attenuation error in the cloud radar data.

  12. Declaration of Helsinki, 2008: Implications for stakeholders in research

    Directory of Open Access Journals (Sweden)

    Puri K

    2009-01-01

    Full Text Available The Declaration of Helsinki (DoH was adopted by the World Medical Association (WMA in 1964, as a statement of ethical principles, to provide guidance to physicians and other participants in medical research involving human subjects. Having undergone several amendments, the most recent version was approved on 18 October 2008, by the WMA General Assembly at Seoul, South Korea, replacing all previous versions. This version highlights issues such as, participant safety, the need to include participants from otherwise underrepresented groups, clinical trial registration, post-study access, usage of data and human tissues, compensating participants with research-related injury, and usage of placebo. In this article, we discuss the major aspects of the 2008 version, including the impact of this version on all stakeholders in research, including, investigators, ethics committee members, sponsors, authors, editors, and reviewers.

  13. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  14. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  15. Reactive power compensator

    Science.gov (United States)

    El-Sharkawi, Mohamed A.; Venkata, Subrahmanyam S.; Chen, Mingliang; Andexler, George; Huang, Tony

    1992-01-01

    A system and method for determining and providing reactive power compensation for an inductive load. A reactive power compensator (50,50') monitors the voltage and current flowing through each of three distribution lines (52a, 52b, 52c), which are supplying three-phase power to one or more inductive loads. Using signals indicative of the current on each of these lines when the voltage waveform on the line crosses zero, the reactive power compensator determines a reactive power compensator capacitance that must be connected to the lines to maintain a desired VAR level, power factor, or line voltage. Alternatively, an operator can manually select a specific capacitance for connection to each line, or the capacitance can be selected based on a time schedule. The reactive power compensator produces control signals, which are coupled through optical fibers (102/106) to a switch driver (110, 110') to select specific compensation capacitors (112) for connections to each line. The switch driver develops triggering signals that are supplied to a plurality of series-connected solid state switches (350), which control charge current in one direction in respect to ground for each compensation capacitor. During each cycle, current flows from ground to charge the capacitors as the voltage on the line begins to go negative from its positive peak value. The triggering signals are applied to gate the solid state switches into a conducting state when the potential on the lines and on the capacitors reaches a negative peak value, thereby minimizing both the potential difference and across the charge current through the switches when they begin to conduct. Any harmonic distortion on the potential and current carried by the lines is filtered out from the current and potential signals used by the reactive power compensator so that it does not affect the determination of the required reactive compensation.

  16. Reactive power compensator

    Energy Technology Data Exchange (ETDEWEB)

    El-Sharkawi, Mohamed A. (Renton, WA); Venkata, Subrahmanyam S. (Woodinville, WA); Chen, Mingliang (Kirkland, WA); Andexler, George (Everett, WA); Huang, Tony (Seattle, WA)

    1992-01-01

    A system and method for determining and providing reactive power compensation for an inductive load. A reactive power compensator (50,50') monitors the voltage and current flowing through each of three distribution lines (52a, 52b, 52c), which are supplying three-phase power to one or more inductive loads. Using signals indicative of the current on each of these lines when the voltage waveform on the line crosses zero, the reactive power compensator determines a reactive power compensator capacitance that must be connected to the lines to maintain a desired VAR level, power factor, or line voltage. Alternatively, an operator can manually select a specific capacitance for connection to each line, or the capacitance can be selected based on a time schedule. The reactive power compensator produces control signals, which are coupled through optical fibers (102/106) to a switch driver (110, 110') to select specific compensation capacitors (112) for connections to each line. The switch driver develops triggering signals that are supplied to a plurality of series-connected solid state switches (350), which control charge current in one direction in respect to ground for each compensation capacitor. During each cycle, current flows from ground to charge the capacitors as the voltage on the line begins to go negative from its positive peak value. The triggering signals are applied to gate the solid state switches into a conducting state when the potential on the lines and on the capacitors reaches a negative peak value, thereby minimizing both the potential difference and across the charge current through the switches when they begin to conduct. Any harmonic distortion on the potential and current carried by the lines is filtered out from the current and potential signals used by the reactive power compensator so that it does not affect the determination of the required reactive compensation.

  17. Elastic-Plastic Calculation of a Dilatation Compensation Component

    Science.gov (United States)

    Atanasiu, Costică; Iliescu, Nicolae; Sorohan, Ștefan

    2017-12-01

    Compensators are elastic structures that have the role of taking over the axial displacements that occur in the junction areas of the technological equipment (pipelines or containers) through which the fluids circulate at pressures and high temperatures. These elastic structures, realized in a very wide range of shapes and sizes, are sujected by the inner pressure and an axial force produced by dilatation of structures in which they are mounted. The calculation of the expansion compensators raises many problems caused by the working regimes of the technological equipments they belong to. Following previous studies, undertaken by calculus and experimental, by the authors of this paper, it was found that in operation the state of stress in these elastic structures exceeds the flow limit of the material from which they are manufacturated. For this reason, in the present paper, the authors present the results of a calculus study, by FEM, on the stress and strain state, in the elasto-plastic regime of a leticular compensator. The calculation was made for two loading modes, separately applied and superimposed. The nonlinear mechanical behavior of this compensator is analyzed and discussed comparatively to the results of previous studies performed in elastic regime on the same type of compensator.

  18. FY 1998 report on the data processing of the geothermal development promotion survey. Secondary. No.B-5 Mt. Musadake area; 1998 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No. B-5 Musadake chiiki (Dai 2 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    As part of the geothermal development promotion survey, the comprehensive analysis was made on the survey of the existence amount of geothermal resource in the Mt. Musadake area, Shibetsu county, Hokkaido, which was conducted in FY 1997 and FY 1998. In the surface survey, the following were carried out: survey of geology/alteration zone, geochemical survey, gravity exploration, wide-area gravity/magnetic structure analysis, seismic exploration, etc. In the well exploration, structural boreholes N10-MD-1 and N10-MD-2 were drilled, and the following were conducted: temperature logging/temperature recovery test, electric logging, water injection test and survey of core cuttings. For borehole N10-MD-2, the survey of geothermal water was made. In the survey of environmental effects, survey of flora/fauna and survey of hot spring variations were conducted. The results of the analysis were outlined as follows. At deep underground, the existence of the deep geothermal water forming geothermal reservoirs is presumed, and the deep geothermal water seems to be helped by the thermal conduction from the magma reservoir related to a series of volcanoes, centered on Mt. Musadake that is regarded as heat source. The geothermal water has a temperature of over 250 degrees C and a high Cl concentration. (NEDO)

  19. Texas' forests, 2008

    Science.gov (United States)

    James W. Bentley; Consuelo Brandeis; Jason A. Cooper; Christopher M. Oswalt; Sonja N. Oswalt; KaDonna Randolph

    2014-01-01

    This bulletin describes forest resources of the State of Texas at the time of the 2008 forest inventory. This bulletin addresses forest area, volume, growth, removals, mortality, forest health, timber product output, and the economy of the forest sector.

  20. Yucca Mountain Biological Resources Monitoring Program; Annual report, FY91

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-01-01

    The US Department of Energy (DOE) is required by the Nuclear Waste Policy Act of 1982 (as amended in 1987) to study and characterize Yucca Mountain as a possible site for a geologic repository for high-level nuclear waste. During site characterization, the DOE will conduct a variety of geotechnical, geochemical, geological, and hydrological studies to determine the suitability of Yucca Mountain as a repository. To ensure that site characterization activities (SCA) do not adversely affect the Yucca Mountain area, an environmental program has been implemented to monitor and mitigate potential impacts and to ensure that activities comply with applicable environmental regulations. This report describes the activities and accomplishments during fiscal year 1991 (FY91) for six program areas within the Terrestrial Ecosystem component of the YMP environmental program. The six program areas are Site Characterization Activities Effects, Desert Tortoises, Habitat Reclamation, Monitoring and Mitigation, Radiological Monitoring, and Biological Support.

  1. Reactive power compensating system

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Timothy J. (Redondo Beach, CA); El-Sharkawi, Mohamed A. (Renton, WA); Venkata, Subrahmanyam S. (Seattle, WA)

    1987-01-01

    The reactive power of an induction machine is compensated by providing fixed capacitors on each phase line for the minimum compensation required, sensing the current on one line at the time its voltage crosses zero to determine the actual compensation required for each phase, and selecting switched capacitors on each line to provide the balance of the compensation required.

  2. Ecological compensation: From general guidance and expertise to specific proposals for road developments

    International Nuclear Information System (INIS)

    Villarroya, Ana; Persson, Jesper; Puig, Jordi

    2014-01-01

    The main scientific bibliography addressing the rationale behind ecological compensation is reviewed in order to examine general guidelines. This contains interesting general guidance on how to implement compensation, and provides the basis for future developments in compensation practice. On this basis, we propose a further step in compensation practice, advancing compensation proposals or rules for specific kinds of projects and contexts, focusing on road projects in the Spanish Environmental Impact Assessment (EIA). Three main residual impacts of roads are identified which usually remain uncompensated for: the loss of natural and semi-natural land use, the increase in emissions resulting from any new road, and the fragmentation, severance or barrier effect on the landscape and its wildlife. To counteract these, four proposals, or “rules”, are advanced: conservation of natural and semi-natural land use area, conservation of dominant plant species physiognomy, compensation for emissions, and the rule of positive defragmentation. -- Highlights: • Ecological compensation theory does not specify guidelines for types of projects. • EIA practitioners lack valuable specific guidance on how to implement compensation. • Specific guidance for road project ecological compensation is proposed. • Compensation proposals should have in mind present-day compensation practice level. • Specific ways to compensate for habitat loss, emissions, and fragmentation are shown

  3. Ecological compensation: From general guidance and expertise to specific proposals for road developments

    Energy Technology Data Exchange (ETDEWEB)

    Villarroya, Ana, E-mail: avillarroya@alumni.unav.es [Department of Zoology and Ecology, University of Navarra, c/Irunlarrea s/n, 31008 Pamplona, Navarra (Spain); Persson, Jesper, E-mail: jesper.persson@slu.se [Department of Landscape Management, Design and Construction, Swedish University of Agricultural Sciences (SLU), P.O. Box 66, SE-230 53 Alnarp (Sweden); Puig, Jordi, E-mail: jpbaguer@unav.es [Department of Zoology and Ecology, University of Navarra, c/Irunlarrea s/n, 31008 Pamplona, Navarra (Spain)

    2014-02-15

    The main scientific bibliography addressing the rationale behind ecological compensation is reviewed in order to examine general guidelines. This contains interesting general guidance on how to implement compensation, and provides the basis for future developments in compensation practice. On this basis, we propose a further step in compensation practice, advancing compensation proposals or rules for specific kinds of projects and contexts, focusing on road projects in the Spanish Environmental Impact Assessment (EIA). Three main residual impacts of roads are identified which usually remain uncompensated for: the loss of natural and semi-natural land use, the increase in emissions resulting from any new road, and the fragmentation, severance or barrier effect on the landscape and its wildlife. To counteract these, four proposals, or “rules”, are advanced: conservation of natural and semi-natural land use area, conservation of dominant plant species physiognomy, compensation for emissions, and the rule of positive defragmentation. -- Highlights: • Ecological compensation theory does not specify guidelines for types of projects. • EIA practitioners lack valuable specific guidance on how to implement compensation. • Specific guidance for road project ecological compensation is proposed. • Compensation proposals should have in mind present-day compensation practice level. • Specific ways to compensate for habitat loss, emissions, and fragmentation are shown.

  4. Imported malaria in an area in southern Madrid, 2005-2008

    Directory of Open Access Journals (Sweden)

    Rubio José M

    2010-10-01

    Full Text Available Abstract Background In Spain, malaria cases are mostly due to migrants and travellers returning from endemic areas. The objective of this work was to describe the malaria cases diagnosed at the Severo Ochoa University Hospital (HUSO in Leganés in the south of the Madrid Region from 2005 to 2008. Methods Descriptive retrospective study performed at HUSO. Data sources are registries from the Microbiology Department and malaria cases notified to the Preventive Medicine Department. Analysed parameters were: administrative, demographical, related to the stay at the endemic country, clinical, microbiological diagnosis method, pregnancy, treatment and prophylaxis, co-infections, and days of hospital stay. Results Fifty-seven patients diagnosed with malaria were studied. Case distribution per year was 13 in 2005, 15 in 2006, 15 in 2007 and 14 in 2008. Thirty-three patients were female (57.9% and 24 male (42.1%. Mean age was 27.8 years. Most of the malaria cases were acquired in Nigeria (49.1% and Equatorial Guinea (32.7%. 29.1% of the patients were immigrants who had arrived recently, and 61.8% acquired malaria when travelling to their countries of origin to visit friends and relatives (VFR. Majority of cases were diagnosed between June and September. Microscopy was positive in 39 cases (68.4% immunochromatography in 42 (73.7% and PCR in the 55 cases where performed. Plasmodium falciparum was responsible for 94.7% of the cases. The more frequent symptoms were fever (77.2%, followed by headache and gastrointestinal symptoms (33.3%. Nine cases needed hospital admittance, a pregnant woman, three children, four VFR and an African tourist, but all evolved favourably. Chemoprophylaxis data was known from 55 patients. It was taken correctly in one case (1.8%, in five (9.1% the prophylaxis was improper while the others 49 (89.1% cases had not followed any anti-malarial prophylaxis. Conclusions Children, pregnant women and the VFR have the highest risk to

  5. 78 FR 8552 - Announcement of Funding Awards, HOPE VI Main Street Grant Program, Fiscal Year (FY) 2011 and 2012

    Science.gov (United States)

    2013-02-06

    ... Awards, HOPE VI Main Street Grant Program, Fiscal Year (FY) 2011 and 2012 AGENCY: Office of the Assistant... the FY 2011 and FY 2012 (FY 2011-12) Notice of Funding Availability (NOFA) for the HOPE VI Main Street... said NOFA. FOR FURTHER INFORMATION CONTACT: For questions concerning the HOPE VI Main Street Program...

  6. 2006 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Gregory J, Shott, Vefa Yucel

    2007-03-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC, 2006) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs) for each of the facilities, with the results submitted as an annual summary report to the U.S. Department of Energy (DOE) Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE, 2000; 2002). The DOE, National Nuclear Security Administration Nevada Site Office performed annual reviews in fiscal year (FY) 2006 by evaluating operational factors and research results that impact the continuing validity of the PAs and CAs results. This annual summary report presents data and conclusions from the FY 2006 review, and determines the adequacy of the PAs and CAs. Operational factors, such as the waste form and containers, facility design, waste receipts, and closure plans, as well as monitoring results and research and development (R&D) activities, were reviewed in FY 2006 for determination of the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed for determination of the adequacy of the CAs.

  7. 2006 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    Gregory J; Shott, Vefa Yucel

    2007-01-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC, 2006) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs) for each of the facilities, with the results submitted as an annual summary report to the U.S. Department of Energy (DOE) Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE, 2000; 2002). The DOE, National Nuclear Security Administration Nevada Site Office performed annual reviews in fiscal year (FY) 2006 by evaluating operational factors and research results that impact the continuing validity of the PAs and CAs results. This annual summary report presents data and conclusions from the FY 2006 review, and determines the adequacy of the PAs and CAs. Operational factors, such as the waste form and containers, facility design, waste receipts, and closure plans, as well as monitoring results and research and development (R and D) activities, were reviewed in FY 2006 for determination of the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R and D activities were reviewed for determination of the adequacy of the CAs

  8. Groundwater conditions and studies in Georgia, 2008-2009

    Science.gov (United States)

    Peck, Michael F.; Leeth, David C.; Painter, Jaime A.

    2011-01-01

    The U.S. Geological Survey collects groundwater data and conducts studies to monitor hydrologic conditions, better define groundwater resources, and address problems related to water supply, water use, and water quality. In Georgia, water levels were monitored continuously at 179 wells during 2008 and 181 wells during 2009. Because of missing data or short periods of record (less than 3 years) for several of these wells, a total of 161 wells are discussed in this report. These wells include 17 in the surficial aquifer system, 19 in the Brunswick aquifer and equivalent sediments, 66 in the Upper Floridan aquifer, 16 in the Lower Floridan aquifer and underlying units, 10 in the Claiborne aquifer, 1 in the Gordon aquifer, 11 in the Clayton aquifer, 12 in the Cretaceous aquifer system, 2 in Paleozoic-rock aquifers, and 7 in crystalline-rock aquifers. Data from the well network indicate that water levels generally rose during the 2008-2009 period, with water levels rising in 135 wells and declining in 26. In contrast, water levels declined over the period of record at 100 wells, increased at 56 wells, and remained relatively constant at 5 wells. In addition to continuous water-level data, periodic water-level measurements were collected and used to construct potentiometric-surface maps for the Upper Floridan aquifer in Camden, Charlton, and Ware Counties, Georgia, and adjacent counties in Florida during September 2008 and May 2009; in the Brunswick, Georgia area during July 2008 and July-August 2009; and in the City of Albany-Dougherty County, Georgia area during November 2008 and November 2009. In general, water levels in these areas were higher during 2009 than during 2008; however, the configuration of the potentiometric surfaces in each of the areas showed little change. Groundwater quality in the Floridan aquifer system is monitored in the Albany, Savannah, Brunswick, and Camden County areas of Georgia. In the Albany area, nitrate as nitrogen concentrations in the

  9. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1992-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993

  10. Fact Sheet: Selected Highlights of the FY2017 Military Construction Appropriations Bills

    Science.gov (United States)

    2016-08-18

    heavily influenced by the statutorily mandated discretionary spending caps established by P.L. 114-74, the Bipartisan Budget Act of 2015 (BBA). A...funding for FY2017 than was the norm during the early years of the 2000s. Figure 1 illustrates the amounts of new budget authority enacted FY2000

  11. Final Report Sustained Spheromak Physics Project FY 1997 - FY 1999

    International Nuclear Information System (INIS)

    Hooper, E.B.; Hill, D.N.

    2000-01-01

    This is the final report on the LDRD SI-funded Sustained Spheromak Physics Project for the years FY1997-FY1999, during which the SSPX spheromak was designed, built, and commissioned for operation at LLNL. The specific LDRD project covered in this report concerns the development, installation, and operation of specialized hardware and diagnostics for use on the SSPX facility in order to study energy confinement in a sustained spheromak plasma configuration. The USDOE Office of Fusion Energy Science funded the construction and routine operation of the SSPX facility. The main distinctive feature of the spheromak is that currents in the plasma itself produce the confining toroidal magnetic field, rather than external coils, which necessarily thread the vacuum vessel. There main objective of the Sustained Spheromak Physics Project was to test whether sufficient energy confinement could be maintained in a spheromak plasma sustained by DC helicity injection. Achieving central electron temperatures of several hundred eV would indicate this. In addition, we set out to determine how the energy confinement scales with T c and to relate the confinement time to the level of internal magnetic turbulence. Energy confinement and its scaling are the central technical issues for the spheromak as a fusion reactor concept. Pending the outcome of energy confinement studies now under way, the spheromak could be the basis for an attractive fusion reactor because of its compact size, simply-connected magnetic geometry, and potential for steady-state current drive

  12. FY2011 Annual Report for NREL Energy Storage Projects

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, A.; Ban, C.; Dillon, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Lee, K. J.; Long, D.; Neubauer, J.; Santhangopalan, S.; Smith, K.

    2012-04-01

    This report describes the work of NREL's Energy Storage group for FY2011. The National Renewable Energy Laboratory (NREL) supports energy storage R&D under the Vehicle Technologies Program at the U.S. Department of Energy (DOE). The DOE Energy Storage program's charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation's goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are: (1) Advanced Battery Development [through the United States Advanced Battery Consortium (USABC)]; (2) Testing, Design and Analysis (TDA); (3) Applied Battery Research (ABR); and (4) Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT). In FY11, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL's R&D projects in FY11 in support of the USABC, TDA, ABR, and BATT program elements. In addition, we continued the enhancement of NREL's battery testing facilities funded through the American Reinvestment and Recovery Act (ARRA) of 2009. The FY11 projects under NREL's Energy Storage R&D program are briefly described below. Each of these is discussed in depth in the main sections of this report.

  13. Idaho National Laboratory Directed Research and Development FY-2009

    Energy Technology Data Exchange (ETDEWEB)

    2010-03-01

    The FY 2009 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support the future DOE missions and national research priorities. LDRD is essential to the INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enhances technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development. Established by Congress in 1991, LDRD proves its benefit each year through new programs, intellectual property, patents, copyrights, publications, national and international awards, and new hires from the universities and industry, which helps refresh the scientific and engineering workforce. The benefits of INL's LDRD research are many as shown in the tables below. Last year, 91 faculty members from various universities contributed to LDRD research, along with 7 post docs and 64 students. Of the total invention disclosures submitted in FY 2009, 7 are attributable to LDRD research. Sixty three refereed journal articles were accepted or published, and 93 invited presentations were attributable to LDRD research conducted in FY 2009. The LDRD Program is administered in accordance with requirements set in DOE Order 413.2B, accompanying contractor requirements, and other DOE and federal requirements invoked through the INL contract. The LDRD Program is implemented in accordance with the annual INL LDRD Program Plan, which is approved by the DOE, Nuclear Energy Program Secretarial Office. This plan outlines the method the laboratory uses to develop its research portfolio, including peer and management reviews, and the use of other INL management systems to ensure quality, financial, safety, security and environmental requirements and risks are

  14. Atmospheric levels of BTEX compounds during the 2008 Olympic Games in the urban area of Beijing.

    Science.gov (United States)

    Liu, Junfeng; Mu, Yujing; Zhang, Yujie; Zhang, Zhimin; Wang, Xiaoke; Liu, Yanju; Sun, Zhenquan

    2009-12-15

    The hourly concentrations of BTEX (Benzene, Toluene, Ethylbenzene, m,p-Xylene and o-Xylene) in the urban area of Beijing were measured during July-October 2008, covering the periods of the 2008 Olympic Games and Paralympic Games. The atmospheric BTEX were pre-concentrated on Tenax-TA tubes, and analyzed by GC-PID (Gas Chromatography with Photo Ionization Detector) after thermal desorption. During the games, the mean daytime concentrations of benzene, toluene, ethylbenzene, m,p-xylene and o-xylene were 2.37, 3.97, 1.92, 3.51 and 1.90 microg/m3, respectively, and were 52.8%, 63.9%, 56.4%, 56.8% and 46.9%, respectively lower than those after the games. The significantly positive correlation between BTEX and CO as well as the ratio of benzene/toluene suggested that the vehicle exhaust was the major source of BTEX during the whole investigated period. The extremely high ratios of ethylbenzene to m,p-xylene (E/X) were mainly observed at noontime in haze days, indicating that photochemical reactions were highly active under these typical days.

  15. NATURAL BARRIERS TARGETED THRUST FY 2004 PROJECTS

    International Nuclear Information System (INIS)

    NA

    2005-01-01

    This booklet contains project descriptions of work performed by the Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM), Office of Science and Technology and International's (OSTandI) Natural Barriers Targeted Thrust during Fiscal Year (FY) 2004. The Natural Barriers Targeted Thrust is part of OSTandI's Science and Technology Program which supports the OCRWM mission to manage and dispose of high-level radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits public confidence. In general, the projects described will continue beyond FY 2004 assuming that the technical work remains relevant to the proposed Yucca Mountain Repository and sufficient funding is made available to the Science and Technology Program

  16. Tort versus no-fault: compensation and injury prevention.

    Science.gov (United States)

    O'Connell, J

    1987-02-01

    The tort system, as a means of compensating the victims of injury, no longer fulfills the purpose for which it was intended. The attempt to achieve a fair and rational method of compensation, especially in the areas of medical malpractice and products liability, has been displaced by a form of litigation lottery which permits attorney's fees to divert great amounts of money from victims in needs. A reform of this system is much in need and long overdue. Following a discussion of these and other problems with the tort system, this paper will present a method for ensuring the prompt settlement of most personal injury claims through payment of the victim's net economic losses. The parallels to no-fault auto insurance and workers' compensation are examined and attention is given to the likely impact of this proposal on the conduct of potential injurers and victims.

  17. NREL Energy Storage Projects. FY2014 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, Ahmad [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ban, Chunmei [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Burton, Evan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gonder, Jeff [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Grad, Peter [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jun, Myungsoo [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Keyser, Matt [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kim, Gi-Heon [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Neubauer, Jeremy [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Santhanagopalan, Shriram [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Saxon, Aron [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Shi, Ying [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Smith, Kandler [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Sprague, Michael [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tenent, Robert [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Wood, Eric [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Yang, Chuanbo [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zhang, Chao [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Han, Taeyoung [General Motors, Detroit, MI (United States); Hartridge, Steve [CD-adapco, Detroit, MI (United States); Shaffer, Christian E. [EC Power, Aurora, CO (United States)

    2015-03-01

    The National Renewable Energy Laboratory supports energy storage R&D under the Office of Vehicle Technologies at the U.S. Department of Energy. The DOE Energy Storage Program’s charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation’s goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are; Advanced Battery Development through the United States Advanced Battery Consortium (USABC); Battery Testing, Analysis, and Design; Applied Battery Research (ABR); and Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT) In FY14, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL’s R&D projects in FY14 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY14 projects under NREL’s Energy Storage R&D program are briefly described below. Each of these is discussed in depth in this report.

  18. Safeguards and Security Technology Development Directory. FY 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    The Safeguards and Security Technology Development Directory is published annually by the Office of Safeguards and Security (OSS) of the US Department of Energy (DOE), and is Intended to inform recipients of the full scope of the OSS R&D program. It is distributed for use by DOE headquarters personnel, DOE program offices, DOE field offices, DOE operating contractors, national laboratories, other federal agencies, and foreign governments. Chapters 1 through 7 of the Directory provide general information regarding the Technology Development Program, including the mission, program description, organizational roles and responsibilities, technology development lifecycle, requirements analysis, program formulation, the task selection process, technology development infrastructure, technology transfer activities, and current research and development tasks. These chapters are followed by a series of appendices which contain more specific information on aspects of the Program. Appendix A is a summary of major technology development accomplishments made during FY 1992. Appendix B lists S&S technology development reports issued during FY 1992 which reflect work accomplished through the OSS Technology Development Program and other relevant activities outside the Program. Finally, Appendix C summarizes the individual task statements which comprise the FY 1993 Technology Development Program.

  19. Endangered species and cultural resources program, Naval Petroleum Reserves in California: Annual report FY95

    International Nuclear Information System (INIS)

    1996-04-01

    In FY95, EG and G Energy Measurements, Inc. (EG and G/EM) continued to support efforts to protect endangered species and cultural resources at the Naval Petroleum Reserves in California (NPRC). These efforts are conducted to ensure NPRC compliance with regulations regarding the protection of listed species and cultural resources on Federal properties. Population monitoring activities are conducted annually for San Joaquin kit foxes, giant kangaroo rats, blunt-nosed leopard lizards, and Hoover's wooly-star. To mitigate impacts of oil field activities on listed species, 674 preactivity surveys covering approximately 211 hectares (521 acres) were conducted in FY95. EG and G/EM also assisted with mitigating effects from third-party projects, primarily by conducting biological and cultural resource consultations with regulatory agencies. EG and G/EM has conducted an applied habitat reclamation program at NPRC since 1985. In FY95, an evaluation of revegetation rates on reclaimed and non-reclaimed disturbed lands was completed, and the results will be used to direct future habitat reclamation efforts at NPRC. In FY95, reclamation success was monitored on 50 sites reclaimed in 1985. An investigation of factors influencing the distribution and abundance of kit foxes at NPRC was initiated in FY94. Factors being examined include habitat disturbance, topography, grazing, coyote abundance, lagomorph abundance, and shrub density. This investigation continued in FY95 and a manuscript on this topic will be completed in FY96. Also, Eg and G/EM completed collection of field data to evaluate the effects of a well blow-out on plant and animal populations. A final report will be prepared in FY96. Finally, EG and G/EM completed a life table analysis on San Joaquin kit foxes at NPRC

  20. Essays in Executive Compensation

    NARCIS (Netherlands)

    D. Zhang (Dan)

    2012-01-01

    textabstractThis dissertation focuses on how executive compensation is designed and its implications for corporate finance and government regulations. Chapter 2 analyzes several proposals to restrict CEO compensation and calibrates two models of executive compensation that describe how firms would

  1. Institutional research and development, FY 1988

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    The Laboratory's Institutional Research and Development (IR and D) Program was established in 1984 to foster exploratory work to advance science and technology, disciplinary research to develop innovative solutions to support our national defense and energy missions. In FY 1988, the IR and D Program was funded by a 2% assessment on the Laboratory's operating budget. Our policy is to use these funds for researching innovative ideas in LLNL's areas of expertise and for developing new areas of expertise that we perceive to be in the national interest. The technical and scientific accomplishments of each project and of each institute funded this year are presented in this report. The projects were selected because they are expected to advance research in important areas that are too basic or too time consuming to be funded by the developmental programs or because they are somewhat risky projects that have the promise of high payoff. We are continually reappraising the IR and D Program. In particular, we seek new candidates for the Director's Initiatives, and we constantly reassess the work in progress. Each year, we make adjustments to further the Laboratory's policy of using the IR and D Program to fund innovative ideas with high potential for enhancing programmatic activities of national importance.

  2. FY-1981 project status for the Transuranic Waste Treatment Facility

    International Nuclear Information System (INIS)

    Benedetti, R.L.; Tait, T.D.

    1981-11-01

    The primary objective of the Transuranic Waste Treatment Facility (TWTF) Project is to provide a facility to process low-level transuranic waste stored at the Idaho National Engineering Laboratory (INEL) into a form acceptable for disposal at the Waste Isolation Pilot Plant. This report provides brief summary descriptions of the project objectives and background, project status through FY-1981, planned activities for FY-1982, and the EG and G TWTF Project office position on processing INEL transuranic waste

  3. Compensation for risks: host community benefits in siting locally unwanted facilities

    Science.gov (United States)

    Himmelberger, Jeffery J.; Ratick, Samuel J.; White, Allen L.

    1991-09-01

    This article analyzes the recent negotiations connected with siting 24 solid-waste landfills in Wisconsin. We examine the association between the type and amount of compensation paid to host communities by facility developers and the size of facilities, certain facility characteristics, the timing of negotiated agreements, the size of the host community, and the socioeconomic status of the host area. Our findings suggest that the level of compensation after adjusting for landfill capacity is positively associated with the percentage of total facility capacity dedicated to host community use, positively associated with the percentage of people of the host area who are in poverty, and larger for public facilities that accept municipal wastes. Other explanatory variables we examined, whose association with levels of compensation proved statistically insignificant, were facility size, facility status (new vs expansion), facility use (countyonly vs multicounty), timing of negotiation, host community size, and the host area education level, population density, and per capita income. We discuss the policy implications of our principal findings and future research questions in light of the persistent opposition surrounding the siting of solid-waste and other waste-management facilities.

  4. Exploring the importance of different items as reasons for leaving emergency medical services between fully compensated, partially compensated, and non-compensated/volunteer samples.

    Science.gov (United States)

    Blau, Gary; Chapman, Susan; Gibson, Gregory; Bentley, Melissa A

    2011-01-01

    The purpose of our study was to investigate the importance of different items as reasons for leaving the Emergency Medical Service (EMS) profession. An exit survey was returned by three distinct EMS samples: 127 full compensated, 45 partially compensated and 72 non-compensated/volunteer respondents, who rated the importance of 17 different items for affecting their decision to leave EMS. Unfortunately, there were a high percentage of "not applicable" responses for 10 items. We focused on those seven items that had a majority of useable responses across the three samples. Results showed that the desire for better pay and benefits was a more important reason for leaving EMS for the partially compensated versus fully compensated respondents. Perceived lack of advancement opportunity was a more important reason for leaving for the partially compensated and volunteer groups versus the fully compensated group. Study limitations are discussed and suggestions for future research offered.

  5. Whiplash and the compensation hypothesis.

    Science.gov (United States)

    Spearing, Natalie M; Connelly, Luke B

    2011-12-01

    Review article. To explain why the evidence that compensation-related factors lead to worse health outcomes is not compelling, either in general, or in the specific case of whiplash. There is a common view that compensation-related factors lead to worse health outcomes ("the compensation hypothesis"), despite the presence of important, and unresolved sources of bias. The empirical evidence on this question has ramifications for the design of compensation schemes. Using studies on whiplash, this article outlines the methodological problems that impede attempts to confirm or refute the compensation hypothesis. Compensation studies are prone to measurement bias, reverse causation bias, and selection bias. Errors in measurement are largely due to the latent nature of whiplash injuries and health itself, a lack of clarity over the unit of measurement (specific factors, or "compensation"), and a lack of appreciation for the heterogeneous qualities of compensation-related factors and schemes. There has been a failure to acknowledge and empirically address reverse causation bias, or the likelihood that poor health influences the decision to pursue compensation: it is unclear if compensation is a cause or a consequence of poor health, or both. Finally, unresolved selection bias (and hence, confounding) is evident in longitudinal studies and natural experiments. In both cases, between-group differences have not been addressed convincingly. The nature of the relationship between compensation-related factors and health is unclear. Current approaches to testing the compensation hypothesis are prone to several important sources of bias, which compromise the validity of their results. Methods that explicitly test the hypothesis and establish whether or not a causal relationship exists between compensation factors and prolonged whiplash symptoms are needed in future studies.

  6. SOLID WASTE INTEGRATED FORECAST TECHNICAL (SWIFT) REPORT FY2005 THRU FY2035 2005.0 VOLUME 2

    Energy Technology Data Exchange (ETDEWEB)

    BARCOT, R.A.

    2005-08-17

    This report provides up-to-date life cycle information about the radioactive solid waste expected to be managed by Hanford's Waste Management (WM) Project from onsite and offsite generators. It includes: (1) an overview of Hanford-wide solid waste to be managed by the WM Project; (2) multi-level and waste class-specific estimates; (3) background information on waste sources; and (4) comparisons to previous forecasts and other national data sources. The focus of this report is low-level waste (LLW), mixed low-level waste (MLLW), and transuranic waste, both non-mixed and mixed (TRU(M)). Some details on hazardous waste are also provided, however, this information is not considered comprehensive. This report includes data requested in December, 2004 with updates through March 31,2005. The data represent a life cycle forecast covering all reported activities from FY2005 through the end of each program's life cycle and are an update of the previous FY2004.1 data version.

  7. Aging and Phase Stability of Alloy 22 Welds FY04 SUMMARY REPORT

    International Nuclear Information System (INIS)

    El-Dasher, B S; Torres, S G; McGregor, M M; Edgecumbe, T S; Yang, N; Headley, T; Chames, J; Yio, J L; Gardea, A

    2006-01-01

    The work presented in this report consists of a compilation of individual activity reports sent to BSC at the conclusion of the FY04 fiscal year. A chapter is dedicated for each individual activity, and describes the accomplishments at the time of writing the original reports, and includes experimental data when appropriate. It is important to note that since work for most of the activities was intended for completion in FY05, no DTN numbers are given in the present report and the results presented here are to be considered preliminary at the time of their writing. Information and results presented in the FY05 Summary Report (UCRL-TR-217339) are more comprehensive and complete and supersede those given in the present report. The five activities addressed in this report are: (1) Preliminary evaluation of burnished and peened samples-metallurgy; (2) Preliminary heat-to-heat variability study-metallurgical; (3) Evaluation of FY00 mockup samples-metallurgy; (4) Weld stability with thick prototypical welds; and (5) Effect of solution annealing onweld metallurgy

  8. Environmental research program: FY 1987, annual report

    International Nuclear Information System (INIS)

    1988-03-01

    This multidisciplinary research program includes fundamental and applied research in physics, chemistry, engineering, and biology, as well as research on the development of advanced methods of measurement and analysis. The Program's Annual Report contains summaries of research performed during FY 1987 in the areas of atmospheric aerosols, flue gas chemistry, combustion, membrane bioenergetics, and analytical chemistry. The main research interests of the Atmospheric Aerosol Research group concern the chemical and physical processes that occur in haze, clouds, and fogs. For their studies, the group is developing novel analytical and research methods for characterizing aerosol species. Aerosol research is performed in the laboratory and in the field. Studies of smoke emissions from fires and their possible effects on climatic change, especially as related to nuclear winter, are an example of the collaboration between the Atmospheric Aerosol Research and Combustion Research Groups

  9. Environmental research program: FY 1987, annual report

    Energy Technology Data Exchange (ETDEWEB)

    1988-03-01

    This multidisciplinary research program includes fundamental and applied research in physics, chemistry, engineering, and biology, as well as research on the development of advanced methods of measurement and analysis. The Program's Annual Report contains summaries of research performed during FY 1987 in the areas of atmospheric aerosols, flue gas chemistry, combustion, membrane bioenergetics, and analytical chemistry. The main research interests of the Atmospheric Aerosol Research group concern the chemical and physical processes that occur in haze, clouds, and fogs. For their studies, the group is developing novel analytical and research methods for characterizing aerosol species. Aerosol research is performed in the laboratory and in the field. Studies of smoke emissions from fires and their possible effects on climatic change, especially as related to nuclear winter, are an example of the collaboration between the Atmospheric Aerosol Research and Combustion Research Groups.

  10. Compensations to Local Communities in the Krsko NPP Decommissioning Program

    International Nuclear Information System (INIS)

    Levanat, I.; Knapp, A.; Lokner, V.

    2010-01-01

    In Slovenia, direct financial compensations (for 'limited land use') to local communities hosting nuclear facilities were initially specified by a government Decree from 2003. In Croatia, a possibility of direct financial compensations had been indicated in the land use plan in conjunction with the prospective RW repository siting about a decade earlier, but the topic was subsequently abandoned together with the repository project. In 2004, the joint Slovenian-Croatian Decommissioning and LILW and SF management program for NPP Krsko from 2004 (the 1st revision of the joint Program) conservatively included the compensation amounts from the Slovenian Decree into the cost estimates of LILW and SF repositories, although their location was entirely unspecified ('in Slovenia or in Croatia'). Shortly before the 2nd revision of the joint Program started in the fall of 2008, the Slovenian government had amended its Decree, practically doubling the amounts of the repository compensations. Assuming that some (or possibly all) nuclear facilities and waste, dealt with in the Program, may be located in Slovenia, the revision has adopted a conservative approach to include all compensations to local communities that may be required by the Slovenian regulations into the Program costs. This paper discusses the Slovenian government Decree, its impact on the joint Program costs, and its implications on RW and SF management in the region. The Decree suffers from the lack of self-consistency, clarity, and consistency with the more general legal provisions on which it should have been based, but it may have an important supporting role in the process of RW and SF management facilities siting. The Decree introduced significant additional costs into the joint Program, which have grown from about one hundred million eur in the 1st revision to about half a billion in this revision (depending on the Program scenario). Besides, application of the Decree in the joint Program has set a precedent

  11. FY14 LLNL OMEGA Experimental Programs

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fournier, K. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Baker, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Barrios, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bernstein, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Brown, G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Celliers, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Chen, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Coppari, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fratanduono, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Johnson, M. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Huntington, C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jenei, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kraus, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ma, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Martinez, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McNabb, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Millot, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Moore, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Nagel, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Park, H. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Patel, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Perez, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ping, Y. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pollock, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ross, J. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rygg, J. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Smith, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Zylstra, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Collins, G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Landen, O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wan, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hsing, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-10-13

    In FY14, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 324 target shots in FY14, with 246 shots using just the OMEGA laser system, 62 shots using just the EP laser system, and 16 Joint shots using Omega and EP together. Approximately 31% of the total number of shots (62 OMEGA shots, 42 EP shots) shots supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 69% (200 OMEGA shots and 36 EP shots, including the 16 Joint shots) were dedicated to experiments for High- Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.

  12. FY15 LLNL OMEGA Experimental Programs

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Baker, K. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Barrios, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Beckwith, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Casey, D. T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Celliers, P. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Chen, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Coppari, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fournier, K. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fratanduono, D. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Frenje, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Huntington, C. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kraus, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lazicki, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Martinez, D. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McNaney, J. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Millot, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pak, A. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Park, H. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ping, Y. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pollock, B. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Smith, R. F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wehrenberg, C. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Widmann, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Collins, G. W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Landen, O. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wan, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hsing, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-12-04

    In FY15, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 468 target shots in FY15, with 315 shots using just the OMEGA laser system, 145 shots using just the EP laser system, and 8 Joint shots using Omega and EP together. Approximately 25% of the total number of shots (56 OMEGA shots and 67 EP shots, including the 8 Joint shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 75% (267 OMEGA shots and 86 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.

  13. Separations and Waste Forms Research and Development FY 2013 Accomplishments Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2013-12-01

    The Separations and Waste Form Campaign (SWFC) under the U.S. Department of Energy (DOE) Fuel Cycle Research and Development Program (FCRD) is responsible for developing advanced separation and waste form technologies to support the various fuel cycle options defined in the DOE Nuclear Energy Research and Development Roadmap, Report to Congress, April 2010. The fiscal year (FY) 2013 accomplishments report provides a highlight of the results of the research and development (R&D) efforts performed within SWFC in FY 2013. Each section contains a high-level overview of the activities, results, technical point of contact, applicable references, and documents produced during the fiscal year. This report briefly outlines campaign management and integration activities, but the intent of the report is to highlight the many technical accomplishments made during FY 2013.

  14. Experimental verification of a two-dimensional respiratory motion compensation system with ultrasound tracking technique in radiation therapy.

    Science.gov (United States)

    Ting, Lai-Lei; Chuang, Ho-Chiao; Liao, Ai-Ho; Kuo, Chia-Chun; Yu, Hsiao-Wei; Zhou, Yi-Liang; Tien, Der-Chi; Jeng, Shiu-Chen; Chiou, Jeng-Fong

    2018-05-01

    This study proposed respiratory motion compensation system (RMCS) combined with an ultrasound image tracking algorithm (UITA) to compensate for respiration-induced tumor motion during radiotherapy, and to address the problem of inaccurate radiation dose delivery caused by respiratory movement. This study used an ultrasound imaging system to monitor respiratory movements combined with the proposed UITA and RMCS for tracking and compensation of the respiratory motion. Respiratory motion compensation was performed using prerecorded human respiratory motion signals and also sinusoidal signals. A linear accelerator was used to deliver radiation doses to GAFchromic EBT3 dosimetry film, and the conformity index (CI), root-mean-square error, compensation rate (CR), and planning target volume (PTV) were used to evaluate the tracking and compensation performance of the proposed system. Human respiratory pattern signals were captured using the UITA and compensated by the RMCS, which yielded CR values of 34-78%. In addition, the maximum coronal area of the PTV ranged from 85.53 mm 2 to 351.11 mm 2 (uncompensated), which reduced to from 17.72 mm 2 to 66.17 mm 2 after compensation, with an area reduction ratio of up to 90%. In real-time monitoring of the respiration compensation state, the CI values for 85% and 90% isodose areas increased to 0.7 and 0.68, respectively. The proposed UITA and RMCS can reduce the movement of the tracked target relative to the LINAC in radiation therapy, thereby reducing the required size of the PTV margin and increasing the effect of the radiation dose received by the treatment target. Copyright © 2018 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  15. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  16. Idaho National Laboratory’s Greenhouse Gas FY08 Baseline

    Energy Technology Data Exchange (ETDEWEB)

    Jennifer D. Morton

    2011-06-01

    A greenhouse gas (GHG) inventory is a systematic attempt to account for the production and release of certain gasses generated by an institution from various emission sources. The gasses of interest are those which have become identified by climate science as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2008 by Idaho National Laboratory (INL), a Department of Energy (DOE)-sponsored entity, located in southeastern Idaho. Concern about the environmental impact of GHGs has grown in recent years. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of a baseline estimate of total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13514 requires that federal agencies and institutions document reductions in GHG emissions in the future, and such documentation will require knowledge of a baseline against which reductions can be measured. INL's FY08 GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three Scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL's organizational boundaries but are a consequence of INL's activities). This inventory found that INL generated a total of 113,049 MT of CO2-equivalent emissions during FY08. The following conclusions were made from looking at the results of the individual contributors to INL's baseline GHG inventory: (1) Electricity (including the associated transmission and

  17. 2008 AESON JOURNAL

    African Journals Online (AJOL)

    OLUWOLE AKINNAGBE

    However, research reports and official documents show that poor people in. Nigeria tend to be concentrated in communities that lack the benefits of modern development. Rural areas and urban fringes have a slightly higher concentration of poor people (Ayanwale and Alimi 2004). Generally, available estimates (CIA 2008, ...

  18. US Department of Energy radioisotope customers with summary of radioisotope shipments, FY 1988

    International Nuclear Information System (INIS)

    Van Houten, N.C.

    1989-06-01

    Pacific Northwest Laboratory (PNL) prepared this edition of the radioisotope customer list at the request of the Office of Health and Environmental Research (ER-73), Office of Energy Research, US Department of Energy (DOE). This is the 25th report in a series dating from 1964. This report covers DOE radioisotope sales and distribution activities by its facilities to domestic, foreign and other DOE facilities for FY 1988. The report is divided into five sections: radioisotope suppliers, facility contacts, and radioisotopes or services supplied; a list of customers, suppliers, and radioisotopes purchased; a list of radioisotopes purchased cross-referenced to customer numbers; geographic locations of radioisotope customers; and radioisotope sales and transfers -- FY 1988. Radioisotopes not previously reported in this series of reports were argon-37, arsenic-72, arsenic-73, bismuth-207, gadolinium-151, rhenium-188, rhodium-101, selenium-72, xenon-123 and zirconium-88. The total value of DOE radioisotope sales for FY 1988 was $11.1 million, an increase of 3% from FY 1987

  19. US Department of Energy radioisotope customers with summary of radioisotope shipments, FY 1988

    Energy Technology Data Exchange (ETDEWEB)

    Van Houten, N.C.

    1989-06-01

    Pacific Northwest Laboratory (PNL) prepared this edition of the radioisotope customer list at the request of the Office of Health and Environmental Research (ER-73), Office of Energy Research, US Department of Energy (DOE). This is the 25th report in a series dating from 1964. This report covers DOE radioisotope sales and distribution activities by its facilities to domestic, foreign and other DOE facilities for FY 1988. The report is divided into five sections: radioisotope suppliers, facility contacts, and radioisotopes or services supplied; a list of customers, suppliers, and radioisotopes purchased; a list of radioisotopes purchased cross-referenced to customer numbers; geographic locations of radioisotope customers; and radioisotope sales and transfers -- FY 1988. Radioisotopes not previously reported in this series of reports were argon-37, arsenic-72, arsenic-73, bismuth-207, gadolinium-151, rhenium-188, rhodium-101, selenium-72, xenon-123 and zirconium-88. The total value of DOE radioisotope sales for FY 1988 was $11.1 million, an increase of 3% from FY 1987.

  20. Air quality in the Netherlands in 2008; Jaaroverzicht Luchtkwaliteit 2008

    Energy Technology Data Exchange (ETDEWEB)

    Beijk, R; Mooibroek, D; Hoogerbrugge, R

    2009-07-01

    Results from the Dutch National Air Quality Monitoring Network (LML) show that in 2008 some exceedances of a few European air quality limit values were measured in the Netherlands. However,similar to 2007, the exceedances were less high and frequent than some years before due to more favorable weather conditions. incidently, high concentrations did occur this year. Especially during both the 2007th and 2008th New Year's Eve, when a very high level of PM10 occurred inside, and even outside, many urban areas due to a combination of fireworks, mist and low windspeeds. Ozone concentrations above the alert threshold (smog alert) were not observed in 2008. Exceedance of limit values for nitrogen dioxide occurred especially at traffic dominated monitoring sites. Nitrogen dioxide concentrations at rural background locations remained fairly stable during the last few years and are lower than the limit value. The maximum number of days with PM10-concentrations above the limit value is not exceeded at any of the monitoring sites in 2008. On average, the 2008 year average concentrations PM10 declined with approximately 2 {mu}g/m{sup 3} compared to 2007. [Dutch] In Nederland zijn in 2008 enkele overschrijdingen van de Europese normen voor de luchtkwaliteit gemeten. Net als in 2007 jaar waren mede door gunstigere weersomstandigheden de overschrijdingen in 2008 minder hoog en frequent dan in voorgaande jaren. Incidenteel deden zich wel hoge concentraties voor. Vooral tijdens de jaarwisseling van 2008/2009 was de concentratie fijn stof in een groot deel van Nederland (wederom) zeer hoog door de combinatie van mist, weinig wind en vuurwerk. Dit blijkt uit meetresultaten van het Landelijk Meentnet Luchtkwaliteit (LML) van het RIVM. Het jaaroverzicht geeft een overzicht van de gemeten en deels berekende luchtkwaliteit. In 2008 waren er geen dagen met ernstige smog door ozon (concentraties boven de Europese alarmdrempel). De jaargemiddelde concentraties van stikstofdioxide (NO2) zijn

  1. LDRD FY 2014 Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  2. Strategy for Meeting the Secretary of Energy and Hanford Site FY 2001 Pollution Prevention Goals

    International Nuclear Information System (INIS)

    CLARK, D.E.

    2000-01-01

    The purpose of this strategy is to identify the Fiscal Year (FY) 2001 Hanford Site waste reduction, sanitary recycling and affirmative procurement goals and identify the action required to ensure that the Secretary of Energy's FY 2005 pollution prevention and the FY 2001 Hanford Site goals are met. The strategy and plan to ensure that the Secretary of Energy's routine waste reduction, recycling, cleanup/stabilization waste and affirmative procurement goals are met consists of four phases. The first phase is to ensure that the infrastructure is in place to support planning and organization. This phase involves ensuring that roles and responsibilities are identified; requirement documents are current; goals and successes are communicated; and accurate and current waste information is available. Roles and responsibilities are identified and the RL requirement documents (i.e., the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan and Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation) will specify the Secretary of Energy's goals. Goals will be communicated formally and informally via the Hanford Reach, training sessions, meetings and correspondence. Sharing of pollution prevention successes and goal progress are encouraged at the Pollution Prevention/Waste Minimization (PZ/WMin) quarterly meetings. Existing site waste generation databases will be utilized to provide current waste generation data. The second phase of the strategy and plan is to establish and allocate goals by prime contractor (i.e. Fluor Hanford, Inc. (FH), Pacific Northwest National Laboratory (PNNL), Bechtel Hanford Inc. (BHI), and CH2MHill Hanford Group (CHG)). This requires determining current status toward meeting the Secretary of Energy's goals; establishing the Hanford Site FY goals, and allocating waste reduction goals by prime contractor. The third phase of the strategy and plan is goal implementation. This

  3. Developing fair compensation structures

    International Nuclear Information System (INIS)

    Trousdale, W.J.

    1998-01-01

    The issue of finding an effective way to incorporate Aboriginal values into the process of developing fair compensation structures was discussed. This paper discusses pricing intangible values using dollars, but it was emphasized that 'values' are whatever are important to us. Therefore, in order to achieve fair compensation, creative alternatives that are value-focused should be pursued. In addition to the more straight-forward monetary compensation, compensation could also be about avoiding losses, mitigating adverse impacts, achieving better communication, and promoting cultural understanding. 25 refs., 2 tabs

  4. [Ecological compensation standard in Dongting Lake region of returning cropland to lake based on emergy analysis].

    Science.gov (United States)

    Mao, De-Hua; Hu, Guang-Wei; Liu, Hui-Jie; Li, Zheng-Zui; Li, Zhi-Long; Tan, Zi-Fang

    2014-02-01

    The annual emergy and currency value of the main ecological service value of returning cropland to lake in Dongting Lake region from 1999 to 2010 was calculated based on emergy analysis. The calculation method of ecological compensation standard was established by calculating annual total emergy of ecological service function increment since the starting year of returning cropland to lake, and the annual ecological compensation standard and compensation area were analyzed from 1999 to 2010. The results indicated that ecological compensation standard from 1999 to 2010 was 40.31-86.48 yuan x m(-2) with the mean of 57.33 yuan x m(-2). The ecological compensation standard presented an increase trend year by year due to the effect of eco-recovery of returning cropland to lake. The ecological compensation standard in the research area presented a swift and steady growth trend after 2005 mainly due to the intensive economy development of Hunan Province, suggesting the value of natural ecological resources would increase along with the development of society and economy. Appling the emergy analysis to research the ecological compensation standard could reveal the dynamics of annual ecological compensation standard, solve the abutment problem of matter flow, energy flow and economic flow, and overcome the subjective and arbitrary of environment economic methods. The empirical research of ecological compensation standard in Dongting Lake region showed that the emergy analysis was feasible and advanced.

  5. Idaho National Laboratory Integrated Safety Management System FY 2012 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Farren Hunt

    2012-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for fiscal year (FY) 2013. Results of the FY 2012 annual effectiveness review demonstrated that the INL’s ISMS program was significantly strengthened. Actions implemented by the INL demonstrate that the overall Integrated Safety Management System is sound and ensures safe and successful performance of work while protecting workers, the public, and environment. This report also provides several opportunities for improvement that will help further strengthen the ISM Program and the pursuit of safety excellence. Demonstrated leadership and commitment, continued surveillance, and dedicated resources have been instrumental in maturing a sound ISMS program. Based upon interviews with personnel, reviews of assurance activities, and analysis of ISMS process implementation, this effectiveness review concludes that ISM is institutionalized and is “Effective”.

  6. Annual Report for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility - Fiscal Year 2016

    Energy Technology Data Exchange (ETDEWEB)

    Birdsell, Kay Hanson [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Stauffer, Philip H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Atchley, Adam Lee [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Miller, Elizabeth D. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Chu, Shaoping [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); French, Sean B. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-03-24

    As a condition to the disposal authorization statement issued to Los Alamos National Laboratory (LANL or the Laboratory) on March 17, 2010, a comprehensive performance assessment and composite analysis (PA/CA) maintenance program must be implemented for the Technical Area 54, Area G disposal facility. Annual determinations of the adequacy of the PA/CA are to be conducted under the maintenance program to ensure that the conclusions reached by those analyses continue to be valid. This report summarizes the results of the fiscal year (FY) 2016 annual review for Area G.

  7. NATURAL BARRIERS TARGETED THRUST FY 2004 PROJECTS

    Energy Technology Data Exchange (ETDEWEB)

    NA

    2005-07-27

    This booklet contains project descriptions of work performed by the Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM), Office of Science and Technology and International's (OST&I) Natural Barriers Targeted Thrust during Fiscal Year (FY) 2004. The Natural Barriers Targeted Thrust is part of OST&I's Science and Technology Program which supports the OCRWM mission to manage and dispose of high-level radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits public confidence. In general, the projects described will continue beyond FY 2004 assuming that the technical work remains relevant to the proposed Yucca Mountain Repository and sufficient funding is made available to the Science and Technology Program.

  8. NREL photovoltaic program FY 1997 annual report

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, R.D.; Hansen, A.; Smoller, S.

    1998-06-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) going to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.

  9. Laboratory directed research and development program FY 2003

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Todd

    2004-03-27

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operate unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. In FY03, Berkeley Lab was authorized by DOE to establish a funding ceiling for the LDRD program of $15.0 M, which equates to about 3.2% of Berkeley Lab's FY03 projected operating and capital equipment budgets. This funding level was provided to develop new scientific ideas and opportunities and allow the Berkeley Lab Director an opportunity to initiate new directions. Budget constraints limited available resources, however, so only $10.1 M was expended for operating and $0.6 M for capital equipment (2.4% of actual Berkeley Lab FY03 costs). In FY03, scientists submitted 168 proposals, requesting over $24.2 M in operating funding. Eighty-two projects were funded, with awards ranging from $45 K to $500 K. These projects are summarized in Table 1.

  10. Compensation for Real Properties Acquired for Roads in Different Procedures - Comparative Analysis

    Directory of Open Access Journals (Sweden)

    Barańska Anna

    2017-12-01

    Full Text Available Real properties acquired for the so-called public purpose, such as road investments, generate a one-off financial indemnity in the form of compensation paid to the expropriated owner. Due to the different possible modes of expropriation (pursuant to the Real Estate Management Act or the Special Road Act, the amount of the compensation due may be determined in different ways, which entails a variety of results. The article compares the compensation levels determined in two possible procedures: basing on the predominant use of the adjacent areas or on data from the transactions of real properties intended for public roads.

  11. Cementitious Barriers Partnership FY2013 End-Year Report

    Energy Technology Data Exchange (ETDEWEB)

    Flach, G. P. [Savannah River Site (SRS), Aiken, SC (United States); Langton, C. A. [Savannah River Site (SRS), Aiken, SC (United States); Burns, H. H. [Savannah River Site (SRS), Aiken, SC (United States); Smith, F. G. [Savannah River Site (SRS), Aiken, SC (United States); Kosson, D. S. [Vanderbilt University, School of Engineering, Nashville, TN (United States); Brown, K. G. [Vanderbilt University, School of Engineering, Nashville, TN (United States); Samson, E. [SIMCO Technologies, Inc., Quebec (Canada); Meeussen, J. C.L. [Nuclear Research and Consultancy Group (NRG), Petten (The Netherlands); van der Sloot, H. A. [Hans van der Sloot Consultancy, Langedijk (The Netherlands); Garboczi, E. J. [Materials & Construction Research Division, National Institute of Standards and Technology, Gaithersburg, MD (United States)

    2013-11-01

    In FY2013, the Cementitious Barriers Partnership (CBP) demonstrated continued tangible progress toward fulfilling the objective of developing a set of software tools to improve understanding and prediction of the long-term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. In November 2012, the CBP released “Version 1.0” of the CBP Software Toolbox, a suite of software for simulating reactive transport in cementitious materials and important degradation phenomena. In addition, the CBP completed development of new software for the “Version 2.0” Toolbox to be released in early FY2014 and demonstrated use of the Version 1.0 Toolbox on DOE applications. The current primary software components in both Versions 1.0 and 2.0 are LeachXS/ORCHESTRA, STADIUM, and a GoldSim interface for probabilistic analysis of selected degradation scenarios. The CBP Software Toolbox Version 1.0 supports analysis of external sulfate attack (including damage mechanics), carbonation, and primary constituent leaching. Version 2.0 includes the additional analysis of chloride attack and dual regime flow and contaminant migration in fractured and non-fractured cementitious material. The LeachXS component embodies an extensive material property measurements database along with chemical speciation and reactive mass transport simulation cases with emphasis on leaching of major, trace and radionuclide constituents from cementitious materials used in DOE facilities, such as Saltstone (Savannah River) and Cast Stone (Hanford), tank closure grouts, and barrier concretes. STADIUM focuses on the physical and structural service life of materials and components based on chemical speciation and reactive mass transport of major cement constituents and aggressive species (e.g., chloride, sulfate, etc.). THAMES is a planned future CBP Toolbox component focused on simulation of the microstructure of cementitious materials and calculation of resultant

  12. Material Recovery and Waste Form Development FY 2015 Accomplishments Report

    Energy Technology Data Exchange (ETDEWEB)

    Todd, Terry Allen [Idaho National Lab. (INL), Idaho Falls, ID (United States); Braase, Lori Ann [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-11-01

    The Material Recovery and Waste Form Development (MRWFD) Campaign under the U.S. Department of Energy (DOE) Fuel Cycle Technologies (FCT) Program is responsible for developing advanced separation and waste form technologies to support the various fuel cycle options defined in the DOE Nuclear Energy Research and Development Roadmap, Report to Congress, April 2010. The FY 2015 Accomplishments Report provides a highlight of the results of the research and development (R&D) efforts performed within the MRWFD Campaign in FY-14. Each section contains a high-level overview of the activities, results, technical point of contact, applicable references, and documents produced during the fiscal year. This report briefly outlines campaign management and integration activities, but primarily focuses on the many technical accomplishments made during FY-15. The campaign continued to utilize an engineering driven-science-based approach to maintain relevance and focus. There was increased emphasis on development of technologies that support near-term applications that are relevant to the current once-through fuel cycle.

  13. 2004 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    Vefa Yucel

    2005-01-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (Bechtel Nevada, 2000) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs) for each of the facilities, and reports the results in an annual summary report to the U.S. Department of Energy Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (U.S. Department of Energy [DOE]). The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office performed annual reviews in fiscal year (FY) 2004 by evaluating operational factors and research results that impact the continuing validity of the PA and CA results. This annual summary report presents data and conclusions from the FY 2004 review, and determines the adequacy of the PAs and CAs. Operational factors, such as the waste form and containers, facility design, waste receipts, closure plans, as well as monitoring results and research and development (R and D) activities were reviewed in FY 2004 for the determination of the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R and D activities were reviewed for the determination of the adequacy of the CAs

  14. 77 FR 5253 - Public Availability of General Services Administration FY 2011 Service Contract Inventory

    Science.gov (United States)

    2012-02-02

    ... GENERAL SERVICES ADMINISTRATION [Notice-MV-2012-01; Docket 2012-0002; Sequence 3] Public Availability of General Services Administration FY 2011 Service Contract Inventory AGENCY: Office of Acquisition Policy (MV); General Services Administration (GSA). ACTION: Notice of public availability of FY...

  15. FY2011 Budget Proposals and Projections

    Science.gov (United States)

    2010-03-29

    and FY2009, and corporate income tax receipts fell even more sharply. Federal deficits, according to OMB and CBO projections, will likely be high...gains receipts can be especially sensitive to cyclical economic conditions. Asset values and corporate profits—and thus federal corporate income tax and

  16. EST Table: FY040497 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available %/178 aa gnl|Amel|GB14136-PA 11/11/04 44 %/215 aa gi|91092102|ref|XP_971936.1| PREDICTED: similar to dysl...exia susceptibility 1 candidate 1 [Tribolium castaneum] FY035337 bmte ...

  17. The Sandia MEMS passive shock sensor : FY07 maturation activities.

    Energy Technology Data Exchange (ETDEWEB)

    Houston, Jack E.; Blecke, Jill; Mitchell, John Anthony; Wittwer, Jonathan W.; Crowson, Douglas A.; Clemens, Rebecca C.; Walraven, Jeremy Allen; Epp, David S.; Baker, Michael Sean

    2008-08-01

    This report describes activities conducted in FY07 to mature the MEMS passive shock sensor. The first chapter of the report provides motivation and background on activities that are described in detail in later chapters. The second chapter discusses concepts that are important for integrating the MEMS passive shock sensor into a system. Following these two introductory chapters, the report details modeling and design efforts, packaging, failure analysis and testing and validation. At the end of FY07, the MEMS passive shock sensor was at TRL 4.

  18. 78 FR 10174 - Public Availability of General Services Administration FY 2012 Service Contract Inventory

    Science.gov (United States)

    2013-02-13

    ... GENERAL SERVICES ADMINISTRATION [Notice-MV-2013-02; Docket No. 2013-0002; Sequence 3] Public Availability of General Services Administration FY 2012 Service Contract Inventory AGENCY: General Services Administration (GSA). ACTION: Notice of Public Availability of FY 2012 Service Contract Inventories. SUMMARY: In...

  19. 75 FR 58373 - Gaining Early Awareness and Readiness for Undergraduate Programs (GEAR UP)

    Science.gov (United States)

    2010-09-24

    ... Readiness for Undergraduate Programs (GEAR UP) AGENCY: Office of Postsecondary Education, Department of Education. ACTION: Notice of intent to fund down the fiscal year (FY) 2008 grant slate for the GEAR UP Program. SUMMARY: The Secretary intends to use the grant slate developed in FY 2008 for the GEAR UP...

  20. Advanced Energy Projects FY 1990 research summaries

    International Nuclear Information System (INIS)

    1990-09-01

    This report serves as a guide to prepare proposals and provides summaries of the research projects active in FY 1990, sponsored by the Office of Basic Energy Sciences Division of Advanced Energy Projects, Department of Energy. (JF)

  1. 2010 Annual Summary Report for the Area 3 and Area 5 Radioactive Management Sites at the Nevada National Security Site, Nye County, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2011-03-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 Radioactive Waste Management Site (RWMS) Performance Assessments (PAs) and Composite Analyses (CAs) in fiscal year (FY) 2010. This annual summary report presents data and conclusions from the FY 2010 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) (formerly the Nevada Test Site) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.

  2. Exploratory research and development FY90

    International Nuclear Information System (INIS)

    Struble, G.L.; Middleton, C.; Baldwin, G.; Cherniak, J.; Clements, W.; Donohue, M.L.; Francke, A.; Kirvel, R.D.; MacGregor, P.; Shaw, G.

    1990-01-01

    In general, the Exploratory Research and Development (ER ampersand D) Program supports research projects considered too basic or long-range to be funded by other Lawrence Livermore National Laboratory (LLNL) programs. This Program is managed for the Laboratory Director by a special assistant who chairs the LLNL's IR ampersand D Review Committee. Membership in the Review Committee comprises senior LLNL scientists, engineers, and managers whose areas of expertise span the range of scientific disciplines pursued at the Laboratory. The research supported by the Program falls into three categories: Exploratory Research in the Disciplines, Director's Initiatives, and Laboratory-Wide Competition. The first two, Exploratory Research and Director's Initiatives, promote pioneering work in the various scientific disciplines and programmatic areas. Laboratory departments and divisions propose and manage projects in the Exploratory Research category. The Laboratory Director, with the advice of the Review Committee, selects several larger projects to fund as Director's Initiative. These projects, which are proposed and managed by the responsible associate director, are intended to enhance the scope of existing programs or establish new technical directions and programs for the Laboratory. All FY90 projects are described in detail in this report. Other publications on ER ampersand D projects are included in the Publications List at the back of this report

  3. U.S. Department of Education FY 2010 Summary of Performance and Financial Information

    Science.gov (United States)

    US Department of Education, 2011

    2011-01-01

    This paper presents the U.S. Department of Education's Fiscal Year (FY) "2010 Summary of Performance and Financial Information." FY 2010 was a transition year for the Department as it moves to a new strategic plan. The Department is still firmly committed to its mission of promoting achievement and preparation for global competitiveness…

  4. Prescription opioids for occupational injury: results from workers' compensation claims records.

    Science.gov (United States)

    Berecki-Gisolf, Janneke; Collie, Alex; McClure, Roderick J

    2014-09-01

    The objective of this study is to identify the prevalence of opioid prescription use in an Australian workers' compensation population and assess predictors of long-term use. Retrospective administrative data analysis. WorkSafe Victoria (Australia) workers' compensation. Workers with a workers' compensation claim were included if the injury/illness started in 2008 or 2009 (N = 54,931). Claim payments records dating up to 2 years postinjury were analyzed to determine receipt of prescription opioids. Long-term use was defined as use of any opioid beyond 1 year postinjury. Within the follow-up period, 8,933 (16.3%) workers claimed prescription opioids: 10.0% claimed opioids in the first year only, and 6.3% claimed opioids beyond the first year. The most commonly received opioids were codeine (10.4%), oxycodone (7.5%), and tramadol (5.0%). Dextropropoxyphene, which is considered unsafe in many countries because of potentially fatal side effects, was used by 1.9% of injured workers. Progression to long-term use of opioids was common (N = 3,446; 39%): age (35-64 years; the association with age followed an inverse U-shaped curve), women, laborers, lower socioeconomic status, greater work disability, and greater hospital expense were associated with opioid use beyond the first year postinjury. Prescription opioid use for workplace injury in Australia is common but not as common as reports from U.S. workers' compensation schemes. The type of opioid and number of repeat prescriptions are factors that should be carefully considered by practitioners prescribing opioids to injured workers: progression to long-term use is common and not fully explained by injury severity. Wiley Periodicals, Inc.

  5. Fusion Reactor Safety Research Program annual report, FY-79

    International Nuclear Information System (INIS)

    Crocker, J.G.; Cohen, S.

    1980-08-01

    The objective of the program is the development, coordination, and execution of activities related to magnetic fusion devices and reactors that will: (a) identify and evaluate potential hazards, (b) assess and disclose potential environmental impacts, and (c) develop design standards and criteria that eliminate, mitigate, or reduce those hazards and impacts. The program will provide a sound basis for licensing fusion reactors. Included in this report are portions of four reports from two outside contractors, discussions of the several areas in which EG and G Idaho is conducting research activities, a discussion of proposed program plan development, mention of special tasks, a review of fusion technology program coordination by EG and G with other laboratories, and a brief view of proposed FY-80 activities

  6. Near-dome geologic findings - Richton Dome, Mississippi: annual status report for FY 83

    International Nuclear Information System (INIS)

    1984-10-01

    Basin Analysis is a study of the regional and local stratigraphic, tectonic, and salt-tectonic conditions that influenced the development of the Mississippi Salt Basin and Richton Dome, an element within that basin. During FY 83, work was concentrated on the local area surrounding Richton Dome and included the writing of the Midyear FY 83 Richton Dome Screening and Suitability Review, input to the Site Characterization Plan that is being prepared by the Southern Region Geologic Project Manager, and initial development of a near-dome geologic model. The geologic model was compiled using information from approximately 300 oil and gas well geophysical logs and 128 line km (80 line mi) of seismic-reflection profiles. In addition to analysis and interpretation of the logs and profiles, stratigraphic data from each were assembled in a computer-based file and were used to produce computer-generated structural contour maps. Major findings from the analyses include a new configuration for the northern end of Richton Dome and improved definitions of near-dome faults and the rim syncline on the northern and eastern flanks of Richton Dome. 4 references, 6 figures

  7. Annual Report for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility – Fiscal Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    French, Sean B. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Stauffer, Philip H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Birdsell, Kay H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-02-29

    As a condition to the disposal authorization statement issued to Los Alamos National Laboratory (LANL or the Laboratory) on March 17, 2010, a comprehensive performance assessment and composite analysis maintenance program must be implemented for the Technical Area 54, Area G disposal facility. Annual determinations of the adequacy of the performance assessment and composite analysis (PA/CA) are to be conducted under the maintenance program to ensure that the conclusions reached by those analyses continue to be valid. This report summarizes the results of the fiscal year (FY) 2015 annual review for Area G.

  8. 76 FR 19176 - Notice of Public Meeting on FY 2012 Refugee Admissions Program

    Science.gov (United States)

    2011-04-06

    ... DEPARTMENT OF STATE [Public Notice: 7409] Notice of Public Meeting on FY 2012 Refugee Admissions Program There will be a meeting on the President's FY 2012 U.S. Refugee Admissions Program on Thursday, May 12, 2011 from 2 p.m. to 4 p.m. The meeting will be held at the Refugee Processing Center, 1401...

  9. 75 FR 20031 - Notice of Public Meeting on FY 2011 Refugee Admissions Program

    Science.gov (United States)

    2010-04-16

    ... DEPARTMENT OF STATE [Public Notice 6954] Notice of Public Meeting on FY 2011 Refugee Admissions Program There will be a meeting on the President's FY 2011 Refugee Admissions Program on Tuesday, May 4, 2010 from 2 p.m. to 4 p.m. The meeting will be held at the Refugee Processing Center, 1401 Wilson...

  10. Part-time physician faculty in a pediatrics department: a study of equity in compensation and academic advancement.

    Science.gov (United States)

    Darbar, Mumtaz; Emans, S Jean; Harris, Z Leah; Brown, Nancy J; Scott, Theresa A; Cooper, William O

    2011-08-01

    To assess equity in compensation and academic advancement in an academic pediatrics department in which a large proportion of the physician faculty hold part-time appointments. The authors analyzed anonymized data from Vanderbilt University School of Medicine Department of Pediatrics databases for physician faculty (faculty with MD or MD/PhD degrees) employed during July 1, 2007 to June 30, 2008. The primary outcomes were total compensation and years at assistant professor rank. They compared compensation and years at junior rank by part-time versus full-time status, controlling for gender, rank, track, years since first appointment as an assistant professor, and clinical productivity. Of the 119 physician faculty in the department, 112 met inclusion criteria. Among those 112 faculty, 23 (21%) were part-time and 89 (79%) were full-time faculty. Part-time faculty were more likely than full-time faculty to be women (74% versus 28%, P part-time versus full-time status. In other adjusted analyses, faculty with part-time appointments spent an average of 2.48 more years as an assistant professor than did faculty with full-time appointments. Overall group differences in total compensation were not apparent in this department, but physician faculty with part-time appointments spent more time at the rank of assistant professor. This study provides a model for determining and analyzing compensation and effort to ensure equity and transparency across faculty.

  11. Exploratory Research and Development Fund, FY 1990. Report on Lawrence Berkeley Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R&D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R&D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiation biophysics.

  12. Progress report for the Office of Safeguards and Security for FY 1982

    International Nuclear Information System (INIS)

    Smith, D.H.; McKown, H.S.; Walker, R.L.; Sherman, R.L.; Pritchard, C.A.; Carter, J.A.

    1982-12-01

    Progress in various areas funded by, or of interest to, the Office of Safeguards and Security during FY 1982 is reported. The quadrupole mass spectrometer and its mobile laboratory visited several sites; results were uniformly excellent. We designed, built, and evaluated a new ion source for this instrument; as a result, performance is considerably enhanced. We have completed initial evaluation of lutetium for use as a double spike in calibrating holding tanks or other vessels of indeterminate volume. Precisions and accuracies of about 0.1% were obtained. Two uranium standards have been evaluated using NBS isotopic standards and SALE samples

  13. Summary of BISON Development Activities: NEAMS FY14 Report

    Energy Technology Data Exchange (ETDEWEB)

    Williamson, R. L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Novascone, S. R. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hales, J. D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Spencer, B. W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Liu, W. [Anatech, Inc.; Pastore, G. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Perez, D. M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gardner, R. J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Stafford, D. S. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gamble, K. A. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-10-01

    This summary report contains an overview of work performed under the work package entitled “FY2014 NEAMS INL-Engineering Scale Fuel Performance & Interface with RPL Tools.” A first chapter identifies the specific FY-14 milestones, providing a basic description of the associated work and references to related detailed documentation. Where applicable, a representative technical result is provided. A second chapter summarizes substantial additional work including 1) efforts to improve numerical convergence and contact in BISON, 2) development of capability to simulate hydrogen behavior in Zircaloy cladding and 3) efforts to enhance collaborative work with the Halden Research Program. A final chapter briefly outlines planned future work.

  14. Amendment to historical definitions of NPL deletion start and completion dates

    International Nuclear Information System (INIS)

    1992-01-01

    The memorandum amends two historical CERCLIS (Comprehensive Environmental Response Compensation and Liability Information System) definitions of the NPL (National Priorities List) deletion process start and completion dates in the Superfund Comprehensive Accomplishments Plan (SCAP) Manual of FY 1987 and the Superfund Program Management Manual of FY 1988

  15. Development of reconstitution technique of irradiated specimens. 3. Report for FY 1995 and FY 1996 on JAERI-IHI cooperated research program (joint research)

    Energy Technology Data Exchange (ETDEWEB)

    Nishiyama, Yutaka; Fukaya, Kiyoshi; Onizawa, Kunio; Suzuki, Masahide [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Nakamura, Terumi; Kaihara, Shoichiro; Yoshida, Kazuo; Sato, Akira

    1998-10-01

    The cooperated research between Japan Atomic Energy Research Institute and Ishikawajima-Harima Heavy Industries Co., Ltd. on the development of reconstitution technique of irradiated reactor pressure vessel surveillance specimens has been performed from FY 1993. In FY 1993-1994, the method of surface activated joining (SAJ) was applied to reconstitution of Charpy impact specimens. Some verification tests using unirradiated reactor pressure vessel plate materials have shown that SAJ is feasible for a reconstitution technique, in particular, owing to low joining temperature. The present paper reports the results of the cooperated research performed in FY 1995-1996. To improve the quality of the SAJ, the configuration of the end tab surface to be joined with the insert material was modified. The torque measured during joining was also introduced in joining parameters. A nondestructive inspection, temperature measurements in the specimens during joining were performed. The effect of joining on Charpy impact properties was discussed. For practical application of the technique to irradiated specimens, we confirmed that the impact specimens with joining interface gave rise to no failure at the joining position during impact test after neutron irradiation. (author)

  16. Options in Compensation

    DEFF Research Database (Denmark)

    Flor, Christian Riis; Frimor, Hans; Munk, Claus

    2014-01-01

    We derive the optimal compensation contract in a principal–agent setting in which outcome is used to provide incentives for both effort and risky investments. To motivate investment, optimal compensation entails rewards for high as well as low outcomes, and it is increasing at the mean outcome...

  17. USDA Section 9006 Program: Status and Energy Benefits of Grant Awards in FY 2003-2005

    Energy Technology Data Exchange (ETDEWEB)

    Walters, T.; Savage, S.; Brown, J.

    2006-08-01

    At the request of the U. S. Department of Agriculture (USDA) Rural Development, the National Renewable Energy Laboratory reviewed projects awarded in the Section 9006 Program: Renewable Energy Systems and Energy Efficiency Improvements Program. This report quantifies federal and private investment, outlines project status based on recent field updates, and calculates the effects on energy and emissions of energy efficiency and renewable energy projects awarded grants in FY 2003, FY 2004, and FY 2005. An overview of the program challenges and modifications in the first three years of operation is also included.

  18. RELIABILITY OF LENTICULAR EXPANSION COMPENSATORS

    Directory of Open Access Journals (Sweden)

    Gabriel BURLACU,

    2011-11-01

    Full Text Available Axial lenticular compensators are made to take over the longitudinal heat expansion, shock , vibration and noise, made elastic connections for piping systems. In order to have a long life for installations it is necessary that all elements, including lenticular compensators, have a good reliability. This desire can be did by technology of manufactoring and assembly of compensators, the material for lenses and by maintenance.of compensator

  19. How much compensation is enough? A framework for incorporating uncertainty and time discounting when calculating offset ratios for impacted habitats

    NARCIS (Netherlands)

    Moilanen, A.; Teeffelen, van A.J.A.; Ben-Haim, Y.; Ferrier, S.

    2009-01-01

    Biodiversity offset areas may compensate for ecological damage caused by human activity elsewhere. One way of determining the offset ratio, or the compensation area needed, is to divide the present conservation value of the development site by the predicted future conservation value of a

  20. 78 FR 6168 - Public Availability of Social Security Administration Fiscal Year (FY) 2012 Service Contract...

    Science.gov (United States)

    2013-01-29

    ... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2013-0001] Public Availability of Social Security Administration Fiscal Year (FY) 2012 Service Contract Inventory AGENCY: Social Security Administration. ACTION: Notice of Public Availability of FY 2012 Service Contract Inventories. SUMMARY: In accordance with...